42 CFR 137.332 - On what basis may the Secretary reject a final construction project proposal?
Code of Federal Regulations, 2010 CFR
2010-10-01
... face clearly demonstrates that the construction project cannot be completed as proposed. (b) For construction programs proposed to be included in a construction project agreement, the Secretary may also... construction project proposal? 137.332 Section 137.332 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...
7 CFR 1709.117 - Application requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... and the eligible extremely high energy cost communities to be served. (6) Project management. The... perform project management functions. If the applicant proposes to use the equipment or design.... Each application must include a narrative proposal describing the proposed project and addressing...
7 CFR 1709.117 - Application requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... and the eligible extremely high energy cost communities to be served. (6) Project management. The... perform project management functions. If the applicant proposes to use the equipment or design.... Each application must include a narrative proposal describing the proposed project and addressing...
34 CFR 75.112 - Include a proposed project period and a timeline.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 1 2010-07-01 2010-07-01 false Include a proposed project period and a timeline. 75.112 Section 75.112 Education Office of the Secretary, Department of Education DIRECT GRANT PROGRAMS... to meet each objective of the project. (Approved by the Office of Management and Budget under control...
Directory of research projects: Planetary geology and geophysics program
NASA Technical Reports Server (NTRS)
Holt, Henry (Editor)
1990-01-01
Information about currently funded scientific research within the Planetary Geology and Geophysics Program is provided, including the proposal summary sheet from each proposal funded under the program during fiscal year 1990. Information about the research project, including title, principal investigator, institution, summary of research objectives, past accomplishments, and proposed new investigations is also provided.
15 CFR 292.2 - Training development and deployment projects.
Code of Federal Regulations, 2011 CFR
2011-01-01
... to the proposer or from other organizations. Factors that may be considered include: Adequacy of the... authority of the governing or managing organization to conduct the proposed activities; qualifications of... in each solicitation for unique projects. (b) Project objective. The purpose of these projects is to...
7 CFR 3403.7 - Proposal format for phase I applications.
Code of Federal Regulations, 2011 CFR
2011-01-01
... economically disadvantaged small business concerns, or women-owned small business concerns. (2) Project Summary/Abstract. The technical abstract should include a brief description of the problem or opportunity, project... important aspects of the project. The project summary of successful proposals may be published by USDA and...
7 CFR 3403.7 - Proposal format for phase I applications.
Code of Federal Regulations, 2012 CFR
2012-01-01
... economically disadvantaged small business concerns, or women-owned small business concerns. (2) Project Summary/Abstract. The technical abstract should include a brief description of the problem or opportunity, project... important aspects of the project. The project summary of successful proposals may be published by USDA and...
7 CFR 3403.7 - Proposal format for phase I applications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... economically disadvantaged small business concerns, or women-owned small business concerns. (2) Project Summary/Abstract. The technical abstract should include a brief description of the problem or opportunity, project... important aspects of the project. The project summary of successful proposals may be published by USDA and...
7 CFR 3403.7 - Proposal format for phase I applications.
Code of Federal Regulations, 2013 CFR
2013-01-01
... economically disadvantaged small business concerns, or women-owned small business concerns. (2) Project Summary/Abstract. The technical abstract should include a brief description of the problem or opportunity, project... important aspects of the project. The project summary of successful proposals may be published by USDA and...
77 FR 50697 - Proposed Data Collections Submitted for Public Comment and Recommendations
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-22
... publish periodic summaries of proposed projects. To request more information on the proposed projects or... are invited on: (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b...
76 FR 66043 - Proposed Information Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-25
... concerning its proposed renewal of Day of Service Project Promotion Tool. Anyone organizing a volunteer event will be able to register their projects, including: national service projects, corporations, volunteer..., electronic, mechanical, or other technological collection techniques or other forms of information technology...
A Study on the Perceived Risk of Surface Sample Collection Systems in Proposal Formulation
NASA Technical Reports Server (NTRS)
Sunday, Cecily M.
2012-01-01
This project compares design and proposal elements from multiple proposals and presents conclusions and recommendations for sampling systems. Contributions from this project include a list of common evaluation themes, concept and proposal-related strengths and weaknesses and ways in which self-identified risks relate the evaluation of the mission.
The design of a common lunar lander
NASA Technical Reports Server (NTRS)
Driggers, Dan; Hearrell, Sean; Key, Kevin; Le, Brian; Love, Glen; Mcmullen, Rob; Messec, Scott; Ruhnke, Jim
1991-01-01
The Austin Cynthesis Corporation was formed to respond to a Request for Proposal for the design of a Common Lunar Lander (CLL) capable of carrying lightweight (less than 500 kg), unspecified payload to the moon. This Final Design Report Document includes information on the requirements for the design project; the ideas proposed as solutions to the design problem; the work which has been completed in support of the design effort; justifications, validations, and verifications of decisions made during the project; and suggestions for future work to be done in support of the project. A project schedule, including current status of the items included on the schedule, as well as cost and management summaries is also included.
78 FR 28842 - Searchlight Wind Energy Project Record of Decision (DOE/EIS-0413)
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-16
... wind turbine generators (WTGs). The proposed Project includes a wind energy facility and a 230-kV... DEPARTMENT OF ENERGY Western Area Power Administration Searchlight Wind Energy Project Record of...), received a request from Searchlight Wind Energy, LLC (Searchlight) to interconnect its proposed Searchlight...
A methodology to evaluate unplanned proposed transportation projects.
DOT National Transportation Integrated Search
2008-01-01
The Virginia Department of Transportation may be asked to consider proposed transportation projects that have not originated within the transportation planning process. Examples include offers by the private sector to build infrastructure in exchange...
Newspaper Coverage of the Harvard Medicare Project: Regional Distinctions/Discreet Disregard?
ERIC Educational Resources Information Center
Payne, J. Gregory
A study examined American newspaper coverage of the Harvard Medicare Project proposal of 1986, a major health policy proposal calling for comprehensive reforms in the national health program. Using Burrelle's news clipping service which includes every daily newspaper (over 1500) in the United States, all 75 newspaper articles on the project from…
18 CFR 5.6 - Pre-application document.
Code of Federal Regulations, 2011 CFR
2011-04-01
... project, including any daily or seasonal ramping rates, flushing flows, reservoir operations, and flood... document must describe the existing and proposed (if any) project facilities and operations, provide...)(viii). (2) Project location, facilities, and operations. The potential applicant must include in the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-17
.../energy/wind/mohave.html . The Project is proposed to consist of up to 283 turbines, access roads, and... be supplemented with internal access/service roads to each wind turbine. Proposed ancillary... all action alternatives, Project features within the wind-farm site would include turbines aligned...
DOE tallies Class III oil recovery field projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-07-25
Here are details from midterm proposals submitted as part of the US Department of Energy's Class 3 oil recovery field demonstration candidate projects. All of the proposals emphasize dissemination of project details so that the results, if successful, can be applied widely in similar reservoirs. Project results will also be fed into a national petroleum technology transfer network. The proposals include: Gulf of Mexico, Gulf coast, offshore California, a California thermal, immiscible CO[sub 2], produced/potable water, microbial EOR, California diatomite, West Texas Spraberry field, and other Permian Basin fields.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-07
... a connector hub for solar energy that may be produced by future solar generation projects in the... authorization to SCE for the proposed EITP project. The EITP would carry electricity from several renewable energy projects proposed in and around the Ivanpah Valley, including the Ivanpah Solar Energy Generation...
Wetland and Sensitive Species Survey Report for Y-12: Proposed Uranium Processing Facility (UPF)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Giffen, N.; Peterson, M.; Reasor, S.
This report summarizes the results of an environmental survey conducted at sites associated with the proposed Uranium Processing Facility (UPF) at the Y-12 National Security Complex in September-October 2009. The survey was conducted in order to evaluate potential impacts of the overall project. This project includes the construction of a haul road, concrete batch plant, wet soil storage area and dry soil storage area. The environmental surveys were conducted by natural resource experts at ORNL who routinely assess the significance of various project activities on the Oak Ridge Reservation (ORR). Natural resource staff assistance on this project included the collectionmore » of environmental information that can aid in project location decisions that minimize impacts to sensitive resource such as significant wildlife populations, rare plants and wetlands. Natural resources work was conducted in various habitats, corresponding to the proposed areas of impact. Thc credentials/qualifications of the researchers are contained in Appendix A. The proposed haul road traverses a number of different habitats including a power-line right-of-way. wetlands, streams, forest and mowed areas. It extends from what is known as the New Salvage Yard on the west to the Polaris Parking Lot on the east. This haul road is meant to connect the proposed concrete batch plant to the UPF building site. The proposed site of the concrete batch plant itself is a highly disturbed fenced area. This area of the project is shown in Fig. 1. The proposed Wet Soils Disposal Area is located on the north side of Bear Creek Road at the former Control Burn Study Area. This is a second growth arce containing thick vegetation, and extensive dead and down woody material. This area of the project is shown in Fig. 2. Thc dry soils storage area is proposed for what is currently known as the West Borrow Area. This site is located on the west side of Reeves Road south of Bear Creek Road. The site is an early successional field. This area of the project is shown in Fig. 2.« less
The NASA SARP Software Research Infusion Initiative
NASA Technical Reports Server (NTRS)
Hinchey, Mike; Pressburger, Tom; Markosian, Lawrence; Feather, Martin
2006-01-01
A viewgraph presentation describing the NASA Software Assurance Research Program (SARP) research infusion projects is shown. The topics include: 1) Background/Motivation; 2) Proposal Solicitation Process; 3) Proposal Evaluation Process; 4) Overview of Some Projects to Date; and 5) Lessons Learned.
Directory of research projects: Planetary geology and geophysics program
NASA Technical Reports Server (NTRS)
Holt, Henry (Editor)
1992-01-01
Information about currently funded scientific research within the Planetary Geology and Geophysics Program is provided. The directory consists of the proposal summary sheet from each proposal funded under the program during Fiscal Year 1992. The sheets provide information about the research project, including title, principal investigator, institution, summary of research objectives, past accomplishments, and proposed new investigations.
NASA Aerosciences Perspective on Proposed De-Scope of Ares I-X Development Flight Instrumentation
NASA Technical Reports Server (NTRS)
Schuster, David M.
2009-01-01
This position paper is written as a result of a number of emails and a presentation that have recently been circulated concerning the potential reduction of Development Flight Instrumentation (DFI) to be included on the Ares I-X flight test vehicle. A reduction in instrumentation has been proposed presumably to reduce project costs and relieve project schedule pressures. This proposal has generated a significant amount of discussion on both sides of the issue, primarily from those within the project. The intention here is to provide a perspective on this issue from outside the mainline project.
Environmental Assessment Lakeview Geothermal Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Treis, Tania
2012-04-30
The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternativesmore » considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.« less
Common Market measures to promote the use of solar energy - The demonstration project
NASA Astrophysics Data System (ADS)
Kaut, W.
A series of solar technical projects being conducted under the auspices of the Common Market is discussed. The history and legal foundations of this demonstration project, previous proposal requests and their results, and the experiences to date and present status of the project are assessed. Twenty-six projects proposals are being funded; the only German one concerns solar heating of swimming pools. The economic and administrative aspects of these projects are detailed. Problems of the project are discussed, including the allocation of funds between older and newer aspects and financial constraints.
77 FR 58906 - Notice of Final Federal Agency Actions on Proposed Highway in Minnesota
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-24
... the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project on I-90 over the Mississippi River. The proposed project includes replacement of the Interstate 90 (I-90) Dresbach Bridge over the Mississippi River with a new bridge that meets structural and geometric standards as well as...
77 FR 47814 - Fremont and Winema Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-10
... management projects for funding in FY 2013, under the provisions of Title II of the Secure Rural Schools and... will include a review, and evaluation, of FY 2013 Title II proposals including presentations by project... final recommendations for funding of fiscal year 2013 projects. All Fremont and Winema Resource Advisory...
75 FR 60405 - Lincoln National Forest, New Mexico, Integrated Non-Native Invasive Plant Project
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-30
.... The proposal utilizes several management tools, including registered herbicides, biological agents... project that propose herbicide treatment of NNIP species within congressionally designated wilderness and... portions of the LNF and non- herbicide treatment within wilderness and research natural areas. Nature of...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-13
... of timber harvest, road construction and reconstruction, and silvicultural practices used; (2) access... Action The Forest Service is proposing a multi-year project involving a variety of timber harvest, road construction, and forest restoration and enhancement activities. The proposed action would include the harvest...
Bilingual Program Application for Continuation Proposal: Compton Unified School District.
ERIC Educational Resources Information Center
Compton City Schools, CA.
This document contains the continuation proposal for the fourth grade Compton bilingual education program. A review of the third year is included with details on process evaluation, project personnel and duties, new vocabulary developed by the project for lexical references, and inservice training of teachers. Information concerning the proposed…
25 CFR 170.617 - May a tribe include a contingency in its proposal budget?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false May a tribe include a contingency in its proposal budget... Under Isdeaa § 170.617 May a tribe include a contingency in its proposal budget? (a) A tribe with a self...(e)(8). (b) A tribe with a self-governance agreement may include a project-specific line item for...
25 CFR 170.617 - May a tribe include a contingency in its proposal budget?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false May a tribe include a contingency in its proposal budget... Under Isdeaa § 170.617 May a tribe include a contingency in its proposal budget? (a) A tribe with a self...(e)(8). (b) A tribe with a self-governance agreement may include a project-specific line item for...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-21
... complex global challenges related to the participants' community activities. Strong project designs will... program include participation in the design and direction of program implementation including recruitment... Partner Countries: Proposals need to embrace a global program design that incorporates all of the proposed...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-14
..., proposing to study the feasibility of Project Green Dream (Project No. 13625), to be located at the New... Dam are owned and operated by the U.S. Army Corps of Engineers. Project Green Dream would include new...
24 CFR 1003.303 - Project rating.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project rating. 1003.303 Section... Application and Selection Process § 1003.303 Project rating. Each project included in an application that... problem. This factor will address the extent to which there is a need for the proposed project to address...
24 CFR 1003.303 - Project rating.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Project rating. 1003.303 Section... Application and Selection Process § 1003.303 Project rating. Each project included in an application that... problem. This factor will address the extent to which there is a need for the proposed project to address...
24 CFR 1003.303 - Project rating.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project rating. 1003.303 Section... Application and Selection Process § 1003.303 Project rating. Each project included in an application that... problem. This factor will address the extent to which there is a need for the proposed project to address...
24 CFR 1003.303 - Project rating.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Project rating. 1003.303 Section... Application and Selection Process § 1003.303 Project rating. Each project included in an application that... problem. This factor will address the extent to which there is a need for the proposed project to address...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-16
... Pipeline Company, L.L.C.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Rose... the environmental impacts of the Rose Lake Expansion Project involving the modification of compression... in northeastern Pennsylvania. The proposed Rose Lake Expansion Project includes the following...
43 CFR 404.50 - What information will be included in the feasibility report prepared by Reclamation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY... finding as to whether the proposed rural water supply project is feasible and the reasons supporting that determination; (b) A recommendation to Congress regarding whether or not the proposed rural water supply project...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior... SUPPLY PROGRAM Feasibility Studies § 404.51 Are proposed projects under the Rural Water Supply Program... the Reclamation's Rural Water Supply Program. This includes review under Executive Order 12322 to...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-23
... Development Plan (MDP). These proposed projects include: Adding new lifts to serve terrain that is currently only accessible by hiking; replacing old lifts; creating new gladed terrain; improving traffic... (snowtubing and snowshoeing trails); and a lift-served mountain biking trail. All proposed projects are within...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-02
... DEPARTMENT OF AGRICULTURE Forest Service Beaver Creek Landscape Management Project, Ashland Ranger... manner that increases resiliency of the Beaver Creek Landscape Management Project area ecosystem to... requirements to require. The Beaver Creek Landscape Management Project includes treatments previously proposed...
NASA SBIR abstracts of 1991 phase 1 projects
NASA Technical Reports Server (NTRS)
Schwenk, F. Carl; Gilman, J. A.; Paige, J. B.
1992-01-01
The objectives of 301 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1991 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 301, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1991 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.
NASA SBIR abstracts of 1992, phase 1 projects
NASA Technical Reports Server (NTRS)
Schwenk, F. C.; Gilman, J. A.; Paige, J. B.; Sacknoff, S. M.
1993-01-01
The objectives of 346 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1992 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 346, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1992 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.
A Proposed System for Differentiating Elementary Mathematics for Exceptionally Able Students.
ERIC Educational Resources Information Center
Sirr, Palma M.
1984-01-01
A pilot mathematics project for one exceptionally able elementary student expanded to include other students and schools. Project activities included a needs assessment and development of a learning center approach and materials to differentiate the core elementary mathematics curriculum. (CL)
1999-01-01
This appendix examines the nature and type of proposed pipeline projects announced or approved for construction during the next several years in the United States. It also includes those projects in Canada and Mexico that tie-in with the U.S. markets or projects.
5 CFR 470.301 - Program expectations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration... improved personnel methods. (b) The demonstration project must be proposed in a research context. The project plan must include a research design which contains: (1) Measurable goals or objectives; (2...
5 CFR 470.301 - Program expectations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration... improved personnel methods. (b) The demonstration project must be proposed in a research context. The project plan must include a research design which contains: (1) Measurable goals or objectives; (2...
5 CFR 470.301 - Program expectations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration... improved personnel methods. (b) The demonstration project must be proposed in a research context. The project plan must include a research design which contains: (1) Measurable goals or objectives; (2...
5 CFR 470.301 - Program expectations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration... improved personnel methods. (b) The demonstration project must be proposed in a research context. The project plan must include a research design which contains: (1) Measurable goals or objectives; (2...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-22
..._programs/minerals/mining_projects/pan_mine_project.html . FOR FURTHER INFORMATION CONTACT: Miles Kreidler...: Midway Gold US, Inc. (Midway) proposes to construct and operate an open-pit gold mining operation in the... years, which includes 13 years of mining and additional time for associated construction, closure, and...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-30
... a solar energy generation facility on a portion of the ROW application on 13,043 acres of public... application expands on ROW application NVN-085801. The proposed solar energy project would consist of... lands included in a pending solar energy generation ROW application in order to promote the orderly...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-01
... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Intent to Prepare a Draft Environmental Impact Statement for the Proposed Cordova Hills Project in Sacramento County, CA, Corps Permit.... Potentially significant issues to be analyzed in depth in the EIS include loss of waters of the United States...
75 FR 61197 - Notice of Entering Into a Compact With the Republic of the Philippines
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-04
... Project ($214.4 million) The Secondary National Roads Development Project is designed to reduce.... This project will incorporate enhanced safety measures in the final road designs, including: (i) Paved... assess and classify every proposed sub-project, and provide the engineering design and oversight support...
10 CFR 609.4 - Submission of Pre-Applications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... assets or facilities); (c) A business plan which includes an overview of the proposed project, including... project investment, development, construction, operation and maintenance; (2) A description of the new or...-Application these requirements are addressed; (d) A financing plan overview describing: (1) The amount of...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-10
.... Name of Project: Humboldt WaveConnect Pilot Project. f. Location: The project would be located in the... Commission must include on the first page, the project name (Humboldt WaveConnect Pilot Project) and number (P-12779-005), and bear the heading ``Comments on the proposed Humboldt WaveConnect Pilot Project...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council`s capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of themore » proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period.« less
7 CFR 3430.304 - Project Types and priorities.
Code of Federal Regulations, 2014 CFR
2014-01-01
... sciences and other related educational matters. Projects may include faculty development, student... and activities that deliver science-based knowledge and informal educational programs to people... interwoven throughout the life of the project and act to complement and reinforce one another. The proposed...
7 CFR 3430.304 - Project Types and priorities.
Code of Federal Regulations, 2011 CFR
2011-01-01
... sciences and other related educational matters. Projects may include faculty development, student... and activities that deliver science-based knowledge and informal educational programs to people... interwoven throughout the life of the project and act to complement and reinforce one another. The proposed...
7 CFR 3430.304 - Project Types and priorities.
Code of Federal Regulations, 2013 CFR
2013-01-01
... sciences and other related educational matters. Projects may include faculty development, student... and activities that deliver science-based knowledge and informal educational programs to people... interwoven throughout the life of the project and act to complement and reinforce one another. The proposed...
7 CFR 3430.304 - Project Types and priorities.
Code of Federal Regulations, 2012 CFR
2012-01-01
... sciences and other related educational matters. Projects may include faculty development, student... and activities that deliver science-based knowledge and informal educational programs to people... interwoven throughout the life of the project and act to complement and reinforce one another. The proposed...
Midwest Forensics Resource Center Project Summary June 2005
DOE Office of Scientific and Technical Information (OSTI.GOV)
David Baldwin
The mission of the MFRC Research and Development Program, is to provide technological advances in forensic science for the benefit of our regional partners as well as the forensic community at large. Key areas of forensic science need are identified through our interactions with our Midwest partners and our R&D advisory group, as well as through our participation in national meetings in forensic science. Under the sponsorship of the National Institute of Justice, the MFRC solicits proposals for the development of practical and useful technology, instrumentation, and methodology that address needs in areas related to forensic science and its applicationmore » to operational crime laboratories. The MFRC facilitates proposal development by working to establish partnerships between researchers and our regional partners. The MFRC administers a peer-review of the proposals and then funds the selected projects at a cost of approximately $55,000 each, with a 12-month period of performance. The process for selection of these projects includes the following steps: (1) drafting of a call for proposals by MFRC staff, (2) review of the draft call by members of the R&D advisory committee, (3) review and approval of the call by NIJ, (4) issuance of the call to ISU, Ames Laboratory, regional partners, and research organizations, (5) receipt of proposals, (6) review of proposals by R&D advisory committee, (7) ranking and selection by MFRC staff using advisory committee reviews, with concurrence by NIJ, (8) notification of proposers, (9) receipt and review of progress reports by MFRC, (10) receipt and review of final reports by MFRC, R&D advisory committee, and NIJ. The decision to fund any specific project is based upon a peer-reviewed call-for-proposal system administered by the MFRC. The reviewers are crime laboratory specialists and scientists who are asked to rate the proposals on four criteria areas including: (1) relevance to the mission of the MFRC, (2) technical approach and procedures, (3) capabilities, teaming, and leveraging, and (4) implementation plan. A successful proposal demonstrates knowledge of the background for the research and related work in the field and includes a research plan with a defined plan to implement the technology to benefit our partners at the crime laboratories. The project summaries are meant to demonstrate the range of research funded by the MFRC including chemistry, DNA, and patterned evidence. The project summaries describe the forensic need the projects serve as well as the benefits derived from the technology. The summaries provide a brief description of the technology and the accomplishments to date. In addition, the collaboration with regional partners and the status of the implementation of the technology are highlighted. These technical summaries represent the development and implementation of practical and useful technology for crime laboratories that the MFRC hopes to accomplish.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
This Environmental Assessment (EA) evaluates environmental issues associated with constructing and operating an integrated emissions control system proposed by We Energies and its project partners with cost-shared funding support by DOE. The proposed project would be demonstrated at the existing 90-MW Units 7, 8, and 9 of We Energies' coal-fired Presque Isle Power Plant in Marquette, Michigan. The commercial-scale demonstrate would allow utilities to make decisions regarding the integrated emissions control system as a viable commercial option. DOE's share of the funding for the 5-year demonstration project would be about $25 million, while $25 million would also be provided bymore » We Energies and its project partners. This project was selected by DOE under the Clean Coal Power Initiative (CCPI) for negotiation of a cooperative agreement to demonstrate the integration of technologies to reduce emissions of mercury (Hg) and particulate matter, as well as potentially control sulfur dioxide (SO{sub 2}), oxides of nitrogen (NO{sub x}) and hydrochloric acid (HCl) emissions. DOE's decision is whether or not to fund the project. The EA evaluates the principal environmental issues, including air quality, waste management, and traffic, that could result from construction and operation of the proposed project. The EA also considers two reasonably foreseeable scenarios that could result from the no-action alternative in which DOE would not provide cost-shared funding for the proposed project. Key findings include that potential air quality impacts resulting from the proposed project would generally be beneficial because plantwide air emissions would decrease or continue at the same level. The decrease in stack exit temperature would decrease the plume rise, which could result in increased downwind ground-level concentrations of those air pollutants experience little or no decrease in stack emissions. However, results of air dispersion modeling indicated that no major impacts would be expected relative to Prevention of Significant Deterioration increments and National Ambient Air Quality Standards.« less
Photovoltaic pilot projects in the European community
NASA Astrophysics Data System (ADS)
Treble, F. C.; Grassi, G.; Schnell, W.
The paper presents proposals received for the construction of photovoltaic pilot plants as part of the Commission of the European Communities' second 4-year solar energy R and D program. The proposed plants range from 30 to 300 kWp and cover a variety of applications including rural electrification, water pumping, desalination, dairy farming, factories, hospitals, schools and vacation centers. Fifteen projects will be accepted with a total generating capacity of 1 MWp, with preference given to those projects involving the development of new techniques, components and systems.
Proposal for a Library Project for Severely-Profoundly Retarded, Multiple Handicapped Individuals.
ERIC Educational Resources Information Center
South Dakota State Library, Pierre.
A proposal for a library project for mentally and physically handicapped persons at Custer State Hospital includes a listening library for the residents of the hospital with a cassette player in each resident's room. Tape storage would be at the nurse's station on each floor, and the charge nurse on that floor would be responsible for the tapes.…
A Model for Recruiting the New Community College Student.
ERIC Educational Resources Information Center
Pitt Community Coll., Greenville, NC.
This proposal represents a systematic and research-based effort to revitalize traditional recruiting practices and to establish a new recruitment model for reaching the nontraditional student in North Carolina two-year colleges. It includes activities of and findings from a model adult recruiting project. A project overview includes the objectives…
40 CFR 93.122 - Procedures for determining regional transportation-related emissions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... estimated in accordance with reasonable professional practice. (2) The emissions analysis may not include... regional emissions analysis required by §§ 93.118 and 93.119 for the transportation plan, TIP, or project... nonattainment or maintenance area. The analysis shall include FHWA/FTA projects proposed in the transportation...
40 CFR 93.122 - Procedures for determining regional transportation-related emissions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... estimated in accordance with reasonable professional practice. (2) The emissions analysis may not include... regional emissions analysis required by §§ 93.118 and 93.119 for the transportation plan, TIP, or project... nonattainment or maintenance area. The analysis shall include FHWA/FTA projects proposed in the transportation...
40 CFR 93.122 - Procedures for determining regional transportation-related emissions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... estimated in accordance with reasonable professional practice. (2) The emissions analysis may not include... regional emissions analysis required by §§ 93.118 and 93.119 for the transportation plan, TIP, or project... nonattainment or maintenance area. The analysis shall include FHWA/FTA projects proposed in the transportation...
40 CFR 93.122 - Procedures for determining regional transportation-related emissions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... estimated in accordance with reasonable professional practice. (2) The emissions analysis may not include... regional emissions analysis required by §§ 93.118 and 93.119 for the transportation plan, TIP, or project... nonattainment or maintenance area. The analysis shall include FHWA/FTA projects proposed in the transportation...
40 CFR 93.122 - Procedures for determining regional transportation-related emissions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... estimated in accordance with reasonable professional practice. (2) The emissions analysis may not include... regional emissions analysis required by §§ 93.118 and 93.119 for the transportation plan, TIP, or project... nonattainment or maintenance area. The analysis shall include FHWA/FTA projects proposed in the transportation...
75 FR 50987 - Colville Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-18
... Colville, Washington, for the purpose of evaluating and recommending resource management projects for...: The agenda will include a review of fiscal year 2009 and 2010 Title II project proposals submitted by the Forest Service, the public, non-profits and other agencies, presentations by project proponents...
Developing a Long-term Monitoring Program with Undergraduate Students in Marine Sciences
NASA Astrophysics Data System (ADS)
Anders, T. M.; Boryta, M. D.
2015-12-01
A goal of our growing marine geoscience program at Mt. San Antonio College is to involve our students in all stages of developing and running an undergraduate research project. During the initial planning phase, students develop and test their proposals. Instructor-set parameters were chosen carefully to help guide students toward manageable projects but to not limit their creativity. Projects should focus on long-term monitoring of a coastal area in southern California. During the second phase, incoming students will critique the initial proposals, modify as necessary and continue to develop the project. We intend for data collection opportunities to grow from geological and oceanographic bases to eventually include other STEM topics in biology, chemistry, math and GIS. Questions we will address include: What makes this a good research project for a community college? What are the costs and time commitments involved? How will the project benefit students and society? Additionally we will share our initial results, challenges, and unexpected pitfalls and benefits.
75 FR 34715 - Notice of Proposed Information Collection Requests
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-18
..., including through the use of information technology. Dated: June 11, 2010. Darrin A. King, Director... Professional Development grantees for project-monitoring information. Requests for copies of the proposed... DEPARTMENT OF EDUCATION Notice of Proposed Information Collection Requests AGENCY: Department of...
NASA Astrophysics Data System (ADS)
Caruana, C. J.
2011-09-01
The objectives of EC project 'Guidelines on Medical Physics Expert' are to provide for improved implementation of the provisions relating to the Medical Physics Expert within Council Directive 97/43/EURATOM and the proposed recast Basic Safety Standards directive. This includes harmonisation of the mission statement for Medical Physics Services as well as the education and training of the MPE. It also includes detailed knowledge-skills-competence inventories for the Medical Physics Expert in each of Diagnostic and Interventional Radiology, Nuclear Medicine and Radiotherapy. This paper presents the proposed Qualification and Curriculum Frameworks and their application to the Medical Physics Expert in Nuclear Medicine.
1995-05-01
K Task 10c - Water Quality and Hydrology Assessment APPENDIX L Task 10d - Archaeological/Historic Assessment APPENDIX M Task l~e - Ecological ...options to select a proposed project. The first phase included feasibility level design, cost estimating, water quality, ecological , archaeological and...Assessment 47 Ecological Assessment 49 Historic/Archaeological Assessment 53 Socio/Economic Assessment 54 Proposed Project 57 Chapter 7. PRELIMINARY
Code of Federal Regulations, 2011 CFR
2011-04-01
...) Life cycle analysis. For new construction and substantial rehabilitation, the criteria to be used in equipping the proposed development with heating and cooling systems, which shall include a life-cycle cost... the proposed site, site plan, and neighborhood. (f) Market analysis. An analysis of the projected...
Liu, Yu-Qi; Wang, Yue-Xi; Shi, Nan-Nan; Han, Xue-Jie; Lu, Ai-Ping
2017-05-01
To review the current situation and progress of traditional Chinese medicine (TCM) international standards, standard projects and proposals in International Organization for Standardization (ISO)/ technical committee (TC) 249. ISO/TC 249 standards and standard projects on the ISO website were searched and new standard proposals information were collected from ISO/TC 249 National Mirror Committee in China. Then all the available data were summarized in 5 closely related items, including proposed time, proposed country, assigned working group (WG), current stage and classifification. In ISO/TC 249, there were 2 international standards, 18 standard projects and 24 new standard proposals proposed in 2014. These 44 standard subjects increased year by year since 2011. Twenty-nine of them were proposed by China, 15 were assigned to WG 4, 36 were in preliminary and preparatory stage and 8 were categorized into 4 fifields, 7 groups and sub-groups based on International Classifification Standards. A rapid and steady development of international standardization in TCM can be observed in ISO/TC 249.
76 FR 77852 - Agency Information Collection Activities: Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-14
... $109,000; this cost includes: research staff involved in survey design, piloting, implementation... Evaluation.'' The proposed project includes a survey of teachers' use of the National Science, Technology..., services) for STEM education and research. The teacher survey is part of a Phase 3 evaluation that builds...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yarde, Richard
2003-06-13
BPA proposes to fund several water rights acquisition projects proposed by Trout Unlimited Montana Water Project (TU). The funding will be administered by the National Fish and Wildlife Foundation, the entity administering the Columbia Basin Water Transactions Program, initiated under RPA 151 of the National Marine Fisheries Service’s 2000 Biological Opinion on the Operation of the Federal Columbia River Power System. The water rights acquired by TU will be left instream to increase flow and improve water quality. Increasing instream flow of water-limited streams benefits fish listed under the Endangered Species Act. The three projects proposed by TU include: amore » Diversion Reduction Agreement, where the landowner agrees to leave up to 4 cubic feet per second (cfs) of water in Rock Creek for the 2003 irrigation season; another Diversion Reduction Agreement for the latter part of the 2003 irrigation season, under which the landowner would agree to cease diverting 1.65 cfs on Rock Creek and between 3 to 6 cfs from the North Fork Blackfoot River; the final proposal is one piece of a larger project in conjunction with other local, federal and state entities, to install a pipeline and sprinkler system to replace a ditch and flood irrigation system, which will result in the conversion of 15.11 cfs of water rights to instream flow. TU's contribution to the proposal (and BPA’s funding) is limited to working with the landowner to convert the water rights to instream flow; all other components of the project, including the irrigation efficiency work, is being done in conjunction with other federal agencies with independent NEPA and other environmental review and consultation obligations.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beck Colleen M,Edwards Susan R.,King Maureen L.
2011-09-01
This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archivalmore » research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beck Colleen M.,Edwards Susan R.,King Maureen L.
2011-09-01
This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archivalmore » research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beck Colleen M.,Edwards Susan R.,King Maureen L.
2011-09-01
This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archivalmore » research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.« less
75 FR 27982 - Fremont and Winema Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-19
... management projects for funding in FY 2011, under the provisions of Title II of the Secure Rural Schools and...: The agenda will include a review of FY 2011 Title II project proposals submitted by the Forest Service, the public, non-profits and other agencies, presentations by project proponents, and final...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-11
... megawatts of electricity from wind turbine generators (WTGs). The proposed project includes a wind energy... about the installation of red flashing lights on wind turbine generators per Federal Aviation... DEPARTMENT OF ENERGY Western Area Power Administration; Grapevine Canyon Wind Project Record of...
36 CFR 801.7 - Information requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... project; (ii) A description of the proposed project including, as appropriate, photographs, maps, drawings... Criteria exist in the project area, or a brief statement explaining why the Criteria of Effect (See § 801.3... appropriate, photographs, maps, drawings and specifications; (iii) A copy of the National Register form or a...
Griffith Energy Project Final Environmental Impact Statement
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
1999-04-02
Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner,more » needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.« less
Water Resources Research Grant Program Project Descriptions: Fiscal Year 1988
Lew, Melvin; McCoy, Beverly M.
1989-01-01
This report contains information on the 38 new projects funded by the U.S. Geological Survey's Water Resources Research Grant Program in fiscal year 1988 and on 11 projects completed during the year. For the new projects, the report gives the grant number, project title, performing organization, principal investigator(s), project duration, and a project description that includes: (1) identification of water-related problems and problem-solution approach, (2) contribution to problem solution, (3) objectives, and (4) approach. The 38 projects include 14 in the area of ground-water quality problems, 10 in the science and technology of water-quality management, 4 in climate variability and the hydrologic cycle, 7 in institutional change in water-resources management, and 3 in miscellaneous water-resources management problems. For the 11 completed projects, the report gives the grant number, project title, performing organization, principal investigator(s), starting date, date of receipt of final report, and an abstract of the final report. Each project description provides the information needed to obtain a copy of the final report. The report also contains tables showing (1) proposals received according to area of research interest, (2) grant awards and funding according to area of research interest, (3) proposals received according to type of submitting organization, and (4) awards and funding according to type of organization.
Review of the Fiscal Year 2014 (FY14) Defense Environmental International Cooperation (DEIC) Program
2015-05-01
above, this spreadsheet lists all proposed projects by project number and title, the DEIC funds requested for each, the funding for approved projects...originating request, including DoD action officer, email address, and commercial and DSN phone number ; 3. Description – Explain why this...3 Numbers do not add to 100 percent (or $1,691,000) because they do not include funding to support overall DEIC
Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)
NASA Technical Reports Server (NTRS)
Jones, Harry
2005-01-01
The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation questionnaire, and a scoring formula.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-12
... a Programmatic Agreement for Managing Properties Included in or Eligible for Inclusion in the... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...
Power Take-off System for Marine Renewable Devices, CRADA Number CRD-14-566
DOE Office of Scientific and Technical Information (OSTI.GOV)
Muljadi, Eduard
Ocean Renewable Power Company (ORPC) proposes a project to develop and test innovative second-generation power take-off (PTO) components for the U.S. Department of Energy's 2013 FOA: Marine and Hydrokinetic System Performance Advancement, Topic Area 2 (Project). Innovative PTO components will include new and improved designs for bearings, couplings and a subsea electrical generator. Specific project objectives include the following: (1) Develop components for an advanced PTO suitable for MHK devices; (2) Bench test these components; (3) Assess the component and system performance benefits; (4) Perform a system integration study to integrate these components into an ORPC hydrokinetic turbine. National Renewablemore » Energy Laboratory (NREL) will participate on the ORPC lead team to review design of the generator and will provide guidance on the design. Based on inputs from the project team, NREL will also provide an economic analysis of the impacts of the proposed system performance advancements.« less
Advanced system demonstration for utilization of biomass as an energy source. Environmental report
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCollom, M.
1979-01-01
The conclusions and findings of extensive analyses undertaken to assess the environmental impacts and effects of the proposal to assist in an Advanced System Demonstration for Utilization of Biomass as an Energy Source by means of a wood-fueled power plant. Included are a description of the proposed project, a discussion of the existing environment that the project would affect, a summary of the project's impacts on the natural and human environments, a discussion of the project's relationships to other government policies and plans, and an extensive review of the alternatives which were considered in evaluating the proposed action. All findingsmore » of the research undertaken are discussed. More extensive presentations of the methods of analysis used to arrive at the various conclusions are available in ten topical technical appendices.« less
National Science Foundation Postdoctoral Research Mentoring Plan Requirement
NASA Astrophysics Data System (ADS)
Lehr, Dana
2010-01-01
The National Science Foundation (NSF) Grant Proposal Guide (NSF 09-29) contains new guidance regarding compliance with the mentoring requirement of the America COMPETES Act. NSF Program Staff will review the Postdoctoral Researcher Mentoring Plan Requirement with regard to NSF proposal submissions. Each NSF proposal that requests funding to support postdoctoral researchers must include, as a supplementary document, a description of the mentoring activities that will be provided for such individuals. In no more than one page, the mentoring plan must describe the mentoring that will be provided to all postdoctoral researchers supported by the project, irrespective of whether they reside at the submitting organization, any subawardee organization, or at any organization participating in a simultaneously submitted collaborative project. Examples of mentoring activities include, but are not limited to: career counseling; training in preparation of grant proposals, publications and presentations; guidance on ways to improve teaching and mentoring skills; guidance on how to effectively collaborate with researchers from diverse backgrounds and disciplinary areas; and training in responsible professional practices. The proposed mentoring activities will be evaluated as part of the merit review process under the Foundation's broader impacts merit review criterion. Proposals that include funding to support postdoctoral researchers, and, do not include the requisite mentoring plan will be returned without review.
Water Resources Research Grant Program project descriptions, fiscal year 1987
,
1987-01-01
This report contains information on the 34 new projects funded by the United States Geological Survey 's Water Resources Research Grant Program in fiscal year 1987 and on 3 projects completed during the year. For the new projects, the report gives the grant number, project title, performing organization, principal investigator(s), and a project description that includes: (1) identification of water related problems and problem-solution approach (2) contribution to problem solution, (3) objectives, and (4) approach. The 34 projects include 12 in the area of groundwater quality problems, 12 in the science and technology of water quality management, 1 in climate variability and the hydrologic cycle, 4 in institutional change in water resources management, and 5 in surface water management. For the three completed projects, the report furnishes the grant number; project title; performing organization; principal investor(s); starting data; data of receipt of final report; and an abstract of the final report. Each project description provides the information needed to obtain a copy of the final report. The report contains tables showing: (1) proposals received according to area of research interest, (2) grant awards and funding according to area of research interest, (3) proposals received according to type of submitting organization, and (4) awards and funding according to type of organization. (Author 's abstract)
NASA Astrophysics Data System (ADS)
Ryan, J. G.; Singer, J.
2013-12-01
The NSF offers funding programs that support geoscience education spanning atmospheric, oceans, and Earth sciences, as well as environmental science, climate change and sustainability, and research on learning. The 'Resources to Transform Undergraduate Geoscience Education' (RTUGeoEd) is an NSF Transforming Undergraduate Education in STEM (TUES) Type 2 special project aimed at supporting college-level geoscience faculty at all types of institutions. The project's goals are to carry out activities and create digital resources that encourage the geoscience community to submit proposals that impact their courses and classroom infrastructure through innovative changes in instructional practice, and contribute to making transformative changes that impact student learning outcomes and lead to other educational benefits. In the past year information sessions were held during several national and regional professional meetings, including the GSA Southeastern and South-Central Section meetings. A three-day proposal-writing workshop for faculty planning to apply to the TUES program was held at the University of South Florida - Tampa. During the workshop, faculty learned about the program and key elements of a proposal, including: the need to demonstrate awareness of prior efforts within and outside the geosciences and how the proposed project builds upon this knowledge base; need to fully justify budget and role of members of the project team; project evaluation and what matters in selecting a project evaluator; and effective dissemination practices. Participants also spent time developing their proposal benefitting from advice and feedback from workshop facilitators. Survey data gathered from workshop participants point to a consistent set of challenges in seeking grant support for a desired educational innovation, including poor understanding of the educational literature, of available funding programs, and of learning assessment and project evaluation. Many also noted that their institutions did not recognize the value of education-related scholarly activities, or undervaluing it compared to more traditional research activities. Given this reality, faculty desire strategies for balancing their time to allow time to pursue both. The current restructuring of NSF educational programs raises questions regarding future directions and the scale of support that may be available from the proposed Catalyzing Advances in Undergraduate STEM Education (CAUSE) Program. At the time of writing this abstract, specific details have not been communicated, but it appears that CAUSE could encompass components from several programs within the Division of Undergraduate Education's TUES, STEP, and WIDER programs, as well as the Geoscience Education and OEDG programs in the Geosciences Directorate. The RTUGeoEd project will continue to provide support to faculty seeking CAUSE (and other educational funding within DUE).
ERIC Educational Resources Information Center
Education Development Center, Inc, 2004
2004-01-01
The focus of this project was to address global climate change and, in the same context, analyze how proposed solutions could simultaneously enhance employment opportunities for youth. The outcomes of the project include: (1) greater awareness and engagement of youth in climate change issues, including the need to promote renewable energy…
Natural Gas Pipeline and System Expansions
1997-01-01
This special report examines recent expansions to the North American natural gas pipeline network and the nature and type of proposed pipeline projects announced or approved for construction during the next several years in the United States. It includes those projects in Canada and Mexico that tie in with U.S. markets or projects.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-24
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Bunker Hill Groundwater Basin, Riverside-Corona...) will prepare a joint EIS/EIR for the proposed Riverside-Corona Feeder Project. The public and agencies... participate in the planning, design, and construction of the Riverside-Corona Feeder Project including: (i) 20...
Social Service Aide Project. Summary Reports and Proposals.
ERIC Educational Resources Information Center
YMCA of Metropolitan Chicago, IL. Career Options Research and Development (CORD).
The Social Service Aide Project for the training and education of paraprofessionals is a part of the Career Options Research and Development Project of the Young Men's Christian Association of Chicago. These materials include: (1) "A Report of Pilot A Social Service Aide Program: Phase I and II (September 1969-August 1970)," (2)…
75 FR 70201 - Fresno County Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-17
... of the January 12 meeting will be to review new project proposals that were submitted by the January 7, 2011 deadline. The purpose of the meeting on January 26 will be to vote and approve projects to... by January 7, 2011 to the Forest Service. Agenda items to be covered include: (1) Review project...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-12
... Environmental Impact Statement, Tappan Zee Bridge/I-287 Corridor Project (Rockland and Westchester Counties, New... an Environmental Impact Statement (EIS) for the proposed Tappan Zee Bridge/I-287 Corridor project... Port Chester, Westchester County, New York including the Tappan Zee Bridge over the Hudson River. The...
34 CFR 271.20 - What conditions must an applicant meet to obtain funding?
Code of Federal Regulations, 2012 CFR
2012-07-01
... a plan of operation for the proposed project that includes: (1) An effective plan of management that..., gender, age or handicapping condition. (l) The project must have an adequate budget to support the...
34 CFR 271.20 - What conditions must an applicant meet to obtain funding?
Code of Federal Regulations, 2014 CFR
2014-07-01
... a plan of operation for the proposed project that includes: (1) An effective plan of management that..., gender, age or handicapping condition. (l) The project must have an adequate budget to support the...
34 CFR 271.20 - What conditions must an applicant meet to obtain funding?
Code of Federal Regulations, 2013 CFR
2013-07-01
... a plan of operation for the proposed project that includes: (1) An effective plan of management that..., gender, age or handicapping condition. (l) The project must have an adequate budget to support the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-05
... Stabilization Program 2 (NSP2). The data required includes program level, project level and beneficiary level... program level, project level and beneficiary level information collected and reported on by NSP2 grantees...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-30
... of settlement negotiations among New York (NY) State agencies, Champlain Hudson Power Express, Inc.... Subsequently, the Applicant entered into settlement negotiations with several parties regarding the proposed... negotiations resulted in a ``Joint Proposal'' which includes a proposed project alignment and configuration...
78 FR 51812 - Urbanized Area Formula Grants; Passenger Ferry Grant Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-21
... Sources of Match D. Proposal Submission Process E. Proposal Information F. Proposal Content G. Evaluation... as the market value of in-kind contributions integral to the project may be counted as a contribution... making a resubmission for any reason, include all original attachments regardless of which attachments...
ATR National Scientific User Facility 2009 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Todd R. Allen; Mitchell K. Meyer; Frances Marshall
2010-11-01
This report describes activities of the ATR NSUF from FY-2008 through FY-2009 and includes information on partner facilities, calls for proposals, users week and education programs. The report also contains project information on university research projects that were awarded by ATR NSUF in the fiscal years 2008 & 2009. This research is university-proposed researcher under a user facility agreement. All intellectual property from these experiments belongs to the university per the user agreement.
NASA Technical Reports Server (NTRS)
McCurdy, Howard E.
1992-01-01
This folder contains working papers collected to date on a NASA-sponsored history project to document the events leading up to the July 20, 1989 speech setting forth the objectives of the Space Exploration Initiative. Included are a chronology of events, briefing papers produced by the NASA Working Group laying out proposal, briefing charts used to present the proposal, a copy of the President's speech, and an essay summarizing the events that led up to the announcement. Additionally, two fo the interviews conducted as part of the project are enclosed.
Steyer, G.D.; Sasser, C.E.; Visser, J.M.; Swenson, E.M.; Nyman, J.A.; Raynie, R.C.
2003-01-01
Wetland restoration efforts conducted in Louisiana under the Coastal Wetlands Planning, Protection and Restoration Act require monitoring the effectiveness of individual projects as well as monitoring the cumulative effects of all projects in restoring, creating, enhancing, and protecting the coastal landscape. The effectiveness of the traditional paired-reference monitoring approach in Louisiana has been limited because of difficulty in finding comparable reference sites. A multiple reference approach is proposed that uses aspects of hydrogeomorphic functional assessments and probabilistic sampling. This approach includes a suite of sites that encompass the range of ecological condition for each stratum, with projects placed on a continuum of conditions found for that stratum. Trajectories in reference sites through time are then compared with project trajectories through time. Plant community zonation complicated selection of indicators, strata, and sample size. The approach proposed could serve as a model for evaluating wetland ecosystems.
Steyer, Gregory D; Sasser, Charles E; Visser, Jenneke M; Swenson, Erick M; Nyman, John A; Raynie, Richard C
2003-01-01
Wetland restoration efforts conducted in Louisiana under the Coastal Wetlands Planning, Protection and Restoration Act require monitoring the effectiveness of individual projects as well as monitoring the cumulative effects of all projects in restoring, creating, enhancing, and protecting the coastal landscape. The effectiveness of the traditional paired-reference monitoring approach in Louisiana has been limited because of difficulty in finding comparable reference sites. A multiple reference approach is proposed that uses aspects of hydrogeomorphic functional assessments and probabilistic sampling. This approach includes a suite of sites that encompass the range of ecological condition for each stratum, with projects placed on a continuum of conditions found for that stratum. Trajectories in reference sites through time are then compared with project trajectories through time. Plant community zonation complicated selection of indicators, strata, and sample size. The approach proposed could serve as a model for evaluating wetland ecosystems.
ERIC Educational Resources Information Center
Brandt, Richard C.; Knapp, Barbara H.
This project, stemming from work started under the National Science Foundation grant "Development of a Television Computer Assisted Instruction (TVCAI) System" SER-7806412, called for the transfer to videodisc of some of the videotape materials developed under the grant. Three efforts were included in the proposal: design and development…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-25
... includes the operation of 355 existing wind turbine generators during the first three phases of the project... of up to 448 wind turbines. The project would also include all associated collector lines, access... areas and concrete batch plants, if applicable. Up to five different models of wind turbines may be in...
Target community foundations to fund family planning.
1994-04-01
Practical advice was given on how to secure funding for privately sponsored US family planning programs in local communities. The first step is in identifying community foundations that are directly involved in social service delivery in the local area. For example, Norplant kits were made available to low-income women through a grant from the Baltimore-based Abell Foundation. Another example is that local funds were used to produce a Norplant video, which was needed for outreach programs and for explaining the pros and cons of Norplant use. The short video was designed for multiple audiences, even though it was locally produced and funded in Baltimore. Sometimes the health department can create a consortium of providers for applying for a group grant. The Foundation Center in New York provides information on foundations, including state-by-state analysis of foundations and family planning funded projects. The Foundation Directory and Grants Index publishes by subject a list of foundations funding such areas. These publications are available in network or local libraries. Background information needs to be obtained on the guidelines required for applying for a specific foundation's grant; guidelines may vary widely between foundations and have strict or loose restrictions on form and substance. An important initial step is writing a very brief synthesis of your proposal (2 pages), if there is no prior knowledge of the receptivity of the foundation to the proposed program. If the project is within the scope of the foundation, a larger formal proposal is the next step. Foundations want to see well through out projects, budgeted carefully, with evaluation components. Examples of successful projects conducted elsewhere are good testimonials to the potential success of the proposed venture. Cultural acceptance in the community, pilot projects replicable in other areas, and target populations are important considerations to be included in the proposal.
Development of a Tool for an Efficient Calibration of CORSIM Models
DOT National Transportation Integrated Search
2014-08-01
This project proposes a Memetic Algorithm (MA) for the calibration of microscopic traffic flow simulation models. The proposed MA includes a combination of genetic and simulated annealing algorithms. The genetic algorithm performs the exploration of ...
75 FR 15438 - Proposed Information Collection Activity; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-29
... outcomes achieved by the Strengthening Communities Fund in meeting its objective of improving the capacity... Information Collection Activity; Comment Request Proposed Projects Title: Strengthening Communities Fund... to obtain evaluation information from Strengthening Communities Fund (SCF) grantees. Grantees include...
2010-09-01
Mineral resources include metals, industrial minerals (e.g., aggregate, sand and gravel), oil and gas, and geothermal resources that would be of value...the elderberry shrub ( Sambucus sp.), is not present within the project action area. The proposed project is not likely to adversely affect the bald...impairing essential behavioral patterns, including breeding, feeding, or sheltering. Harass is defined by the Service as an action that creates the
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-23
... 1969, as amended, for a proposed flood-risk management project in the Puyallup River Basin including.... This is a single-purpose flood-risk management study. The goal of this project is to identify the.... Alternative 2: Construct a coordinated flood-risk management project that would provide critically needed...
49 CFR Appendix A to Part 611 - Description of Measures Used for Project Evaluation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... alternative, travelers projected to shift to transit because of the new start project, and non-transit users... measure will be based on a multi-modal measure of perceived travel times faced by all users of the..., and level of commitment of each proposed source of local match, including inter-governmental grants...
The Columbia Classroom Environments Project.... Fifth Progress Report, May 1972.
ERIC Educational Resources Information Center
Grannis, Joseph C.
This report is organized into seven chapters. Chapter One, an Introduction by Joseph C. Grannis, includes the most relevant sections of the proposal made by the Columbia Classroom Environments Project (CCEP) to Project Follow Through in August 1970. Chapter Two is an Analysis of the Child Behavior Stream Observations from the Spring 1971 Study of…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-21
... proposal. The information collection applies to applicants seeking HUD financial assistance for their project proposals and is used by HUD for the performance of the Department's compliance with the National... the proper performance of the functions of the agency, including whether the information will have...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kleschev, Yu.N.; Chukharev, V.F.
1996-04-01
This paper describes proposals on scientific and technical collaborations pertaining to solid oxide fuel cell commercialization. Topics included for discussion are: materials research and manufacture; market estimation and cost; directions of collaboration; and project of proposals on joint enterprise creation.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-24
... Impact Statement for the Proposed Pokagon Band Tribal Village Fee-to-Trust Acquisition and Casino Project..., return address and the caption specifying ``Scoping Comments for Proposed Pokagon Band Tribal Village... Village, which will include 44 housing units, a multi-purpose facility, health service and other tribal...
NASA Astrophysics Data System (ADS)
Dobaria, Archana S.; Coble, Kimberly A.; Alejandra, Le; Berryhill, Katie; McLin, Kevin M.; Cominsky, Lynn R.
2018-06-01
As part of a general education undergraduate astronomy course at a minority-serving university in the Midwestern US, students completed an observing project with the Global Telescope Network (GTN), where they participated in realistic practices used by professional astronomers, including proposal writing and peer review. First, students went through the process of applying for telescope time by choosing an astronomical object and writing an observing proposal. Then they performed an NSF-style review of classmates’ proposals, including written peer reviews and a review panel. After obtaining images from GTN telescopes, students presented their project and findings in front of the class.This study investigates students’ experiences and perceived impacts of participation in the project. The data analyzed includes an essay assignment [N = 59] administered over seven semesters and individual interviews [N = 8] collected over two semesters. Students were prompted to address what they liked, disliked, or would change about the project experience. These data were coded iteratively into nine categories. A Kruskal-Wallis (KW) test was used to determine that essay results from different semesters could be combined. We find that students expressed an overall strong positive affect, increased perception of self-efficacy, enjoyment of the experience of peer review, an appreciation for being able to use real scientific tools and to take on the role of astronomers, as well as a small number of dislikes such as real-world constraints on observing.
78 FR 14620 - Joint Development: Proposed Circular
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-06
... of opportunities for private sector participation in public transportation projects, and includes the most current guidance for the federal public transportation program. By this notice, FTA invites public... that are not unique to public transportation projects, but which have application to all federally...
Development of a statewide motorcycle safety plan for Texas : technical report.
DOT National Transportation Integrated Search
2013-02-01
The objective of this research project was to develop a statewide plan to reduce motorcycle crashes and : injuries in the state of Texas. The project included a review of published literature on current and proposed : countermeasures for reducing the...
10 CFR 611.106 - Environmental requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... significant environmental effects expected to occur as a result of the project; (3) Identify the effects of... cumulative effects resulting from existing or reasonably foreseeable projects; (4) Identify measures proposed... on-site manpower requirements and payroll during construction and operation, including the number of...
10 CFR 611.106 - Environmental requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... significant environmental effects expected to occur as a result of the project; (3) Identify the effects of... cumulative effects resulting from existing or reasonably foreseeable projects; (4) Identify measures proposed... on-site manpower requirements and payroll during construction and operation, including the number of...
10 CFR 611.106 - Environmental requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... significant environmental effects expected to occur as a result of the project; (3) Identify the effects of... cumulative effects resulting from existing or reasonably foreseeable projects; (4) Identify measures proposed... on-site manpower requirements and payroll during construction and operation, including the number of...
10 CFR 611.106 - Environmental requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... significant environmental effects expected to occur as a result of the project; (3) Identify the effects of... cumulative effects resulting from existing or reasonably foreseeable projects; (4) Identify measures proposed... on-site manpower requirements and payroll during construction and operation, including the number of...
10 CFR 611.106 - Environmental requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... significant environmental effects expected to occur as a result of the project; (3) Identify the effects of... cumulative effects resulting from existing or reasonably foreseeable projects; (4) Identify measures proposed... on-site manpower requirements and payroll during construction and operation, including the number of...
NASA Astrophysics Data System (ADS)
Takizawa, Kuniharu
A novel three-dimensional (3-D) projection display used with polarized eyeglasses is proposed. It consists of polymer-dispersed liquid crystal-light valves that modulate the illuminated light based on light scattering, a polarization beam splitter, and a Schlieren projection system. The features of the proposed display include a 3-D image display with a single projector, half size and half power consumption compared with a conventional 3-D projector with polarized glasses. Measured electro-optic characteristics of a polymer-dispersed liquid-crystal cell inserted between crossed polarizers suggests that the proposed display achieves small cross talk and high-extinction ratio.
A method for evaluating the funding of components of natural resource and conservation projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wellington, John F., E-mail: welling@ipfw.edu; Lewis, Stephen A., E-mail: lewis.sa07@gmail.com
Many public and private entities such as government agencies and private foundations have missions related to the improvement, protection, and sustainability of the environment. In pursuit of their missions, they fund projects with related outcomes. Typically, the funding scene consists of scarce funding dollars for the many project requests. In light of funding limitations and funder's search for innovative funding schemes, a method to support the allocation of scarce dollars among project components is presented. The proposed scheme has similarities to methods in the project selection literature but differs in its focus on project components and its connection to andmore » enumeration of the universe of funding possibilities. The value of having access to the universe is demonstrated with illustrations. The presentation includes Excel implementations that should appeal to a broad spectrum of project evaluators and reviewers. Access to the space of funding possibilities facilitates a rich analysis of funding alternatives. - Highlights: • Method is given for allocating scarce funding dollars among competing projects. • Allocations are made to fund parts of projects • Proposed method provides access to the universe of funding possibilities. • Proposed method facilitates a rich analysis of funding possibilities. • Excel spreadsheet implementations are provided.« less
NASA Astrophysics Data System (ADS)
Wang, L. M.
2017-09-01
A novel model-free adaptive sliding mode strategy is proposed for a generalized projective synchronization (GPS) between two entirely unknown fractional-order chaotic systems subject to the external disturbances. To solve the difficulties from the little knowledge about the master-slave system and to overcome the bad effects of the external disturbances on the generalized projective synchronization, the radial basis function neural networks are used to approach the packaged unknown master system and the packaged unknown slave system (including the external disturbances). Consequently, based on the slide mode technology and the neural network theory, a model-free adaptive sliding mode controller is designed to guarantee asymptotic stability of the generalized projective synchronization error. The main contribution of this paper is that a control strategy is provided for the generalized projective synchronization between two entirely unknown fractional-order chaotic systems subject to the unknown external disturbances, and the proposed control strategy only requires that the master system has the same fractional orders as the slave system. Moreover, the proposed method allows us to achieve all kinds of generalized projective chaos synchronizations by turning the user-defined parameters onto the desired values. Simulation results show the effectiveness of the proposed method and the robustness of the controlled system.
2015-05-18
of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering...describe the proposed content of Project ArchimedeZ, 4 ) describe incentives that Project ArchimedeZ will give to Total Force Airmen to participate and...engaged, most of the time, in some sort of PME but at a manageable level. Rather than a three- hour block, for example, Project ArchimedeZ would deliver
The SIMPSONS project: An integrated Mars transportation system
NASA Astrophysics Data System (ADS)
Kaplan, Matthew; Carlson, Eric; Bradfute, Sherie; Allen, Kent; Duvergne, Francois; Hernandez, Bert; Le, David; Nguyen, Quan; Thornhill, Brett
In response to the Request for Proposal (RFP) for an integrated transportation system network for an advanced Martian base, Frontier Transportation Systems (FTS) presents the results of the SIMPSONS project (Systems Integration for Mars Planetary Surface Operations Networks). The following topics are included: the project background, vehicle design, future work, conclusions, management status, and cost breakdown. The project focuses solely on the surface-to-surface transportation at an advanced Martian base.
The SIMPSONS project: An integrated Mars transportation system
NASA Technical Reports Server (NTRS)
Kaplan, Matthew; Carlson, Eric; Bradfute, Sherie; Allen, Kent; Duvergne, Francois; Hernandez, Bert; Le, David; Nguyen, Quan; Thornhill, Brett
1992-01-01
In response to the Request for Proposal (RFP) for an integrated transportation system network for an advanced Martian base, Frontier Transportation Systems (FTS) presents the results of the SIMPSONS project (Systems Integration for Mars Planetary Surface Operations Networks). The following topics are included: the project background, vehicle design, future work, conclusions, management status, and cost breakdown. The project focuses solely on the surface-to-surface transportation at an advanced Martian base.
Science Base and Tools for Evaluating Stream Restoration Project Proposals.
NASA Astrophysics Data System (ADS)
Cluer, B.; Thorne, C.; Skidmore, P.; Castro, J.; Pess, G.; Beechie, T.; Shea, C.
2008-12-01
Stream restoration, stabilization, or enhancement projects typically employ site-specific designs and site- scale habitat improvement projects have become the default solution to many habitat problems and constraints. Such projects are often planned and implemented without thorough consideration of the broader scale problems that may be contributing to habitat degradation, attention to project resiliency to flood events, accounting for possible changes in climate or watershed land use, or ensuring the long term sustainability of the project. To address these issues, NOAA Fisheries and USFWS have collaboratively commissioned research to develop a science document and accompanying tools to support more consistent and comprehensive review of stream management and restoration projects proposals by Service staff responsible for permitting. The science document synthesizes the body of knowledge in fluvial geomorphology and presents it in a way that is accessible to the Services staff biologists, who are not trained experts in this field. Accompanying the science document are two electronic tools: a Project Information Checklist to assist in evaluating whether a proposal includes all the information necessary to allow critical and thorough project evaluation; and a Project Evaluation Tool (in flow chart format) that guides reviewers through the steps necessary to critically evaluate the quality of the information submitted, the goals and objectives of the project, project planning and development, project design, geomorphic-habitat-species relevance, and risks to listed species. Materials for training Services staff and others in the efficient use of the science document and tools have also been developed. The longer term goals of this effort include: enabling consistent and comprehensive reviews that are completed in a timely fashion by regulators; facilitating improved project planning and design by proponents; encouraging projects that are attuned to their watershed and geomorphic contexts; questioning perceived constraints on project design; reducing the use of hard structures and encouraging deformability; promoting designs that address both risk and uncertainty in applying engineering design standards; allowing for future climate and land use changes; and encouraging post-project monitoring, appraisal and project aftercare.
14 CFR 1274.209 - Evaluation and selection.
Code of Federal Regulations, 2013 CFR
2013-01-01
... and educational institutions, including historically black colleges and universities and minority... among U.S. firms, identification of potential markets, appropriateness of business risks. (f) Proposal... business base projections, the market for proposed products, and/or the impact of anticipated product price...
14 CFR 1274.209 - Evaluation and selection.
Code of Federal Regulations, 2010 CFR
2010-01-01
... and educational institutions, including historically black colleges and universities and minority... among U.S. firms, identification of potential markets, appropriateness of business risks. (f) Proposal... business base projections, the market for proposed products, and/or the impact of anticipated product price...
14 CFR 1274.209 - Evaluation and selection.
Code of Federal Regulations, 2011 CFR
2011-01-01
... and educational institutions, including historically black colleges and universities and minority... among U.S. firms, identification of potential markets, appropriateness of business risks. (f) Proposal... business base projections, the market for proposed products, and/or the impact of anticipated product price...
14 CFR § 1274.209 - Evaluation and selection.
Code of Federal Regulations, 2014 CFR
2014-01-01
... and educational institutions, including historically black colleges and universities and minority... among U.S. firms, identification of potential markets, appropriateness of business risks. (f) Proposal... business base projections, the market for proposed products, and/or the impact of anticipated product price...
14 CFR 1274.209 - Evaluation and selection.
Code of Federal Regulations, 2012 CFR
2012-01-01
... and educational institutions, including historically black colleges and universities and minority... among U.S. firms, identification of potential markets, appropriateness of business risks. (f) Proposal... business base projections, the market for proposed products, and/or the impact of anticipated product price...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-16
... transmission lines, 5 new substations, modifications to 4 existing substations, maintenance access roads... address the construction, operation, and maintenance of Basin Electric's proposed Project. The Project includes construction, operation and maintenance of approximately 275 [[Page 50027
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-20
.... If the proposed projects include information technology (i.e., hardware, software, etc.), provide... information developed and disseminated through the projects is appropriate, useful and addresses the most... and HHS. With the limited funds available for [[Page 50129
Project NOAH: Regulating modern sea-level rise. Phase II: Jerusalem Underground
NASA Astrophysics Data System (ADS)
Newman, Walter S.; Fairbridge, Rhodes W.
This proposal builds a high-speed inter-urban express between Jerusalem and Tel Aviv, generates 1500 megawatts of hydroelectric energy, curtails littoral erosion, builds a port along the Israeli Mediterranean coast and demands peaceful cooperation on both sides of the Jordan River. Phase II represents a pilot project demonstrating the feasibility of continuing to regulate world sea-level by a new series of water regulation schemes. Phase I previously described all those projects already completed or underway which have inadvertently and/or unintentionally served the purpose of sea-level regulation. These forms of Phase I sea-level regulation include large and small reservoirs, irrigation projects, water infiltration schemes, farm ponds, and swimming and reflecting pools. All these water storage projects have already exercised a very appreciable brake on 20th century sea-level rise. Phase II outlines a high-visibility proposal which will serve to illustrate the viability of “Project NOAH”.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-02
.... Name of Project: Red Rock Hydroelectric Project. f. Location: The project is located at the U.S. Army Corps of Engineers Lake Red Rock Dam on the Des Moines River in Marion County, Iowa. g. Filed Pursuant.... Army Corps of Engineers' Lake Red Rock Dam. The applicant's proposal also includes the installation of...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-13
... system. The proposed action would include up to 42 wind turbine generators, an underground electrical...] Notice of Intent To Prepare an Environmental Impact Statement for the Walker Ridge Wind Project, Lake and...: You may submit comments related to the Walker Ridge Wind Project by any of the following methods: Web...
22 CFR 67.4 - Description of functions and procedures.
Code of Federal Regulations, 2011 CFR
2011-04-01
... strong democratic civic culture, including support for publications and other communications media and... fraught with violence. (14) Proposes a program, project or activity that is clearly relevant to NED... purpose of supporting physical violence by individuals, groups or governments; (6) The proposing...
22 CFR 67.4 - Description of functions and procedures.
Code of Federal Regulations, 2013 CFR
2013-04-01
... strong democratic civic culture, including support for publications and other communications media and... fraught with violence. (14) Proposes a program, project or activity that is clearly relevant to NED... purpose of supporting physical violence by individuals, groups or governments; (6) The proposing...
22 CFR 67.4 - Description of functions and procedures.
Code of Federal Regulations, 2014 CFR
2014-04-01
... strong democratic civic culture, including support for publications and other communications media and... fraught with violence. (14) Proposes a program, project or activity that is clearly relevant to NED... purpose of supporting physical violence by individuals, groups or governments; (6) The proposing...
22 CFR 67.4 - Description of functions and procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... strong democratic civic culture, including support for publications and other communications media and... fraught with violence. (14) Proposes a program, project or activity that is clearly relevant to NED... purpose of supporting physical violence by individuals, groups or governments; (6) The proposing...
22 CFR 67.4 - Description of functions and procedures.
Code of Federal Regulations, 2012 CFR
2012-04-01
... strong democratic civic culture, including support for publications and other communications media and... fraught with violence. (14) Proposes a program, project or activity that is clearly relevant to NED... purpose of supporting physical violence by individuals, groups or governments; (6) The proposing...
Environmental information volume: Liquid Phase Methanol (LPMEOH{trademark}) project
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-05-01
The purpose of this project is to demonstrate the commercial viability of the Liquid Phase Methanol Process using coal-derived synthesis gas, a mixture of hydrogen and carbon monoxide. This report describes the proposed actions, alternative to the proposed action, the existing environment at the coal gasification plant at Kingsport, Tennessee, environmental impacts, regulatory requirements, offsite fuel testing, and DME addition to methanol production. Appendices include the air permit application, solid waste permits, water permit, existing air permits, agency correspondence, and Eastman and Air Products literature.
Model-based sphere localization (MBSL) in x-ray projections
NASA Astrophysics Data System (ADS)
Sawall, Stefan; Maier, Joscha; Leinweber, Carsten; Funck, Carsten; Kuntz, Jan; Kachelrieß, Marc
2017-08-01
The detection of spherical markers in x-ray projections is an important task in a variety of applications, e.g. geometric calibration and detector distortion correction. Therein, the projection of the sphere center on the detector is of particular interest as the used spherical beads are no ideal point-like objects. Only few methods have been proposed to estimate this respective position on the detector with sufficient accuracy and surrogate positions, e.g. the center of gravity, are used, impairing the results of subsequent algorithms. We propose to estimate the projection of the sphere center on the detector using a simulation-based method matching an artificial projection to the actual measurement. The proposed algorithm intrinsically corrects for all polychromatic effects included in the measurement and absent in the simulation by a polynomial which is estimated simultaneously. Furthermore, neither the acquisition geometry nor any object properties besides the fact that the object is of spherical shape need to be known to find the center of the bead. It is shown by simulations that the algorithm estimates the center projection with an error of less than 1% of the detector pixel size in case of realistic noise levels and that the method is robust to the sphere material, sphere size, and acquisition parameters. A comparison to three reference methods using simulations and measurements indicates that the proposed method is an order of magnitude more accurate compared to these algorithms. The proposed method is an accurate algorithm to estimate the center of spherical markers in CT projections in the presence of polychromatic effects and noise.
Geology of Potential Landing Sites for Martian Sample Returns
NASA Technical Reports Server (NTRS)
Greeley, Ronald
2003-01-01
This project involved the analysis of potential landing sites on Mars. As originally proposed, the project focused on landing sites from which samples might be returned to Earth. However, as the project proceeded, the emphasis shifted to missions that would not include sample return, because the Mars Exploration Program had deferred sample returns to the next decade. Subsequently, this project focused on the study of potential landing sites for the Mars Exploration Rovers.
NASA SBIR abstracts of 1990 phase 1 projects
NASA Technical Reports Server (NTRS)
Schwenk, F. C.; Gilman, J. A.; Paige, J. B.
1991-01-01
The research objectives of the 280 projects placed under contract in the National Aeronautics and Space Administration (NASA) 1990 Small Business Innovation Research (SBIR) Phase 1 program are described. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses in response to NASA's 1990 SBIR Phase 1 Program Solicitation. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 280, in order of its appearance in the body of the report. The document also includes Appendixes to provide additional information about the SBIR program and permit cross-reference in the 1990 Phase 1 projects by company name, location by state, principal investigator, NASA field center responsible for management of each project, and NASA contract number.
7 CFR 1709.117 - Application requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... project including target community, goals, tasks to be completed and other relevant information that... to support a finding of technical feasibility; (ii) Identify the major tasks to be performed and a proposed timeline for completion of each task; and (iii) Identify the location of the project target area...
Automated Procurement System (APS) revised project management plan (DS-03)
NASA Technical Reports Server (NTRS)
Murphy, Diane R.
1995-01-01
The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
Develop Improved Materials to Support the Hydrogen Economy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dr. Michael C. Martin
The Edison Materials Technology Center (EMTEC) solicited and funded hydrogen infrastructure related projects that have a near term potential for commercialization. The subject technology of each project is related to the US Department of Energy hydrogen economy goals as outlined in the multi-year plan titled, 'Hydrogen, Fuel Cells and Infrastructure Technologies Program Multi-Year Research, Development and Demonstration Plan.' Preference was given to cross cutting materials development projects that might lead to the establishment of manufacturing capability and job creation. The Edison Materials Technology Center (EMTEC) used the US Department of Energy hydrogen economy goals to find and fund projects withmore » near term commercialization potential. An RFP process aligned with this plan required performance based objectives with go/no-go technology based milestones. Protocols established for this program consisted of a RFP solicitation process, white papers and proposals with peer technology and commercialization review (including DoE), EMTEC project negotiation and definition and DoE cost share approval. Our RFP approach specified proposals/projects for hydrogen production, hydrogen storage or hydrogen infrastructure processing which may include sensor, separator, compression, maintenance, or delivery technologies. EMTEC was especially alert for projects in the appropriate subject area that have cross cutting materials technology with near term manufacturing and commercialization opportunities.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Agalgaonkar, Yashodhan P.; Hammerstrom, Donald J.
The Pacific Northwest Smart Grid Demonstration (PNWSGD) was a smart grid technology performance evaluation project that included multiple U.S. states and cooperation from multiple electric utilities in the northwest region. One of the local objectives for the project was to achieve improved distribution system reliability. Toward this end, some PNWSGD utilities automated their distribution systems, including the application of fault detection, isolation, and restoration and advanced metering infrastructure. In light of this investment, a major challenge was to establish a correlation between implementation of these smart grid technologies and actual improvements of distribution system reliability. This paper proposes using Welch’smore » t-test to objectively determine and quantify whether distribution system reliability is improving over time. The proposed methodology is generic, and it can be implemented by any utility after calculation of the standard reliability indices. The effectiveness of the proposed hypothesis testing approach is demonstrated through comprehensive practical results. It is believed that wider adoption of the proposed approach can help utilities to evaluate a realistic long-term performance of smart grid technologies.« less
Wang, Hui; Xu, Yanan; Shi, Hongli
2018-03-15
Metal artifacts severely degrade CT image quality in clinical diagnosis, which are difficult to removed, especially for the beam hardening artifacts. The metal artifact reduction (MAR) based on prior images are the most frequently-used methods. However, there exists a lot misclassification in most prior images caused by absence of prior information such as spectrum distribution of X-ray beam source, especially when multiple or big metal are included. This work aims is to identify a more accurate prior image to improve image quality. The proposed method includes four steps. First, the metal image is segmented by thresholding an initial image, where the metal traces are identified in the initial projection data using the forward projection of the metal image. Second, the accurate absorbent model of certain metal image is calculated according to the spectrum distribution of certain X-ray beam source and energy-dependent attenuation coefficients of metal. Third, a new metal image is reconstructed by the general analytical reconstruction algorithm such as filtered back projection (FPB). The prior image is obtained by segmenting the difference image between the initial image and the new metal image into air, tissue and bone. Fourth, the initial projection data are normalized by dividing the projection data of prior image pixel to pixel. The final corrected image is obtained by interpolation, denormalization and reconstruction. Several clinical images with dental fillings and knee prostheses were used to evaluate the proposed algorithm and normalized metal artifact reduction (NMAR) and linear interpolation (LI) method. The results demonstrate the artifacts were reduced efficiently by the proposed method. The proposed method could obtain an exact prior image using the prior information about X-ray beam source and energy-dependent attenuation coefficients of metal. As a result, better performance of reducing beam hardening artifacts can be achieved. Moreover, the process of the proposed method is rather simple and little extra calculation burden is necessary. It has superiorities over other algorithms when include multiple and/or big implants.
Nevada Test Site-Directed Research and Development, FY 2007 Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wil Lewis, editor
2008-02-20
The Nevada Test Site-Directed Research and Development (SDRD) program completed a very successful year of research and development activities in FY 2007. Twenty-nine new projects were selected for funding this year, and eight projects started in FY 2006 were brought to conclusion. The total funds expended by the SDRD program were $5.67 million, for an average per-project cost of $153 thousand. An external audit conducted in September 2007 verified that appropriate accounting practices were applied to the SDRD program. Highlights for the year included: programmatic adoption of 8 SDRD-developed technologies; the filing of 9 invention disclosures for innovation evolving frommore » SDRD projects; participation in the tri-Lab Laboratory Directed Research and Development (LDRD) and SDRD Symposium that was broadly attended by Nevada Test Site (NTS), National Nuclear Security Administration (NNSA), LDRD, U.S. Department of Homeland Security (DHS), and U.S. Department of Defense (DoD) representatives; peer reviews of all FY 2007 projects; and the successful completion of 37 R&D projects, as presented in this report. In response to a company-wide call, authors throughout the NTS complex submitted 182 proposals for FY 2007 SDRD projects. The SDRD program has seen a dramatic increase in the yearly total of submitted proposals--from 69 in FY 2002 to 182 this year--while the number of projects funded has actually decreased from a program high of 57 in FY 2004. The overall effect of this trend has helped ensure an increasingly competitive program that benefited from a broader set of innovative ideas, making project selection both challenging and rewarding. Proposals were evaluated for technical merit, including such factors as innovation, probability of success, potential benefit, and mission applicability. Authors and reviewers benefited from the use of a shortfalls list entitled the 'NTS Technology Needs Assessment' that was compiled from NTS, National Weapons Laboratory (NWL), and NNSA sources. This tool continues to be of considerable value in aligning the SDRD program with mission priorities, and was expanded in FY 2007 to include technology development needs from the DHS and other agencies with missions closely aligned to that of the NTS.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... reduction would be completed using mechanical and hand methods and prescribed fire. Proposed road actions include maintenance and reconstruction of National Forest System roads, construction of temporary roads to complete project activities, and closure and decommissioning of National Forest System roads and existing...
Funding for Library Automation.
ERIC Educational Resources Information Center
Thompson, Ronelle K. H.
This paper provides a brief overview of planning and implementing a project to fund library automation. It is suggested that: (1) proposal budgets should include all costs of a project, such as furniture needed for computer terminals, costs for modifying library procedures, initial supplies, or ongoing maintenance; (2) automation does not save…
75 FR 36150 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-24
... licenses, permits, and approvals for the highway and transit project. Tier 1 decisions also may be relied... Administrator, Federal Highway Administration, 3250 Executive Park Drive, Springfield, Illinois 62703, Phone... eliminated from further consideration and study, including but not limited to, the No-Action Alternative...
Code of Federal Regulations, 2014 CFR
2014-04-01
... PROJECT COSTS Application for License for Major Project-Existing Dam § 4.50 Applicability. (a... to any application for either an initial license or new license for a major project—existing dam that... apply to any major project—existing dam (see § 4.40) that is proposed to entail or include: (i) Any...
Code of Federal Regulations, 2013 CFR
2013-04-01
... PROJECT COSTS Application for License for Major Project-Existing Dam § 4.50 Applicability. (a... to any application for either an initial license or new license for a major project—existing dam that... apply to any major project—existing dam (see § 4.40) that is proposed to entail or include: (i) Any...
Code of Federal Regulations, 2012 CFR
2012-04-01
... PROJECT COSTS Application for License for Major Project-Existing Dam § 4.50 Applicability. (a... to any application for either an initial license or new license for a major project—existing dam that... apply to any major project—existing dam (see § 4.40) that is proposed to entail or include: (i) Any...
Send Your Students to Mars for Their next Research Project
ERIC Educational Resources Information Center
Lindgren, Charles
2006-01-01
The NASA's Mars Student Imaging Project (MSIP) is led by the Arizona State University (ASU) Mars Education Program, a major partner of NASA's Mars Exploration Program. MSIP is based on the National Science Education Standards and includes curriculum on terrestrial planet characteristics, experimental design, and proposal writing. Three spacecraft…
78 FR 54516 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-04
... provider (including a pediatrician for a child) and of the right to obtain access to obstetrical or... affordable care act notice of patient protection. DATES: Written comments should be received on or before... Notice of Patient Protection. OMB Number: 1545-2181. Regulation Project Number: REG-120399-10 [RIN 1545...
Code of Federal Regulations, 2011 CFR
2011-04-01
... PROJECT COSTS Application for License for Major Project-Existing Dam § 4.50 Applicability. (a... to any application for either an initial license or new license for a major project—existing dam that... apply to any major project—existing dam (see § 4.40) that is proposed to entail or include: (i) Any...
Code of Federal Regulations, 2010 CFR
2010-04-01
... PROJECT COSTS Application for License for Major Project-Existing Dam § 4.50 Applicability. (a... to any application for either an initial license or new license for a major project—existing dam that... apply to any major project—existing dam (see § 4.40) that is proposed to entail or include: (i) Any...
48 CFR 1352.215-70 - Proposal preparation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... evaluation factor.] Evaluation Factor 1—Technical Approach. Provide information on how the project is to be... time each individual will be available for this project, and, if necessary, explain why the key person... person or labor category including number of labor-hours and current actual average hourly rates based on...
48 CFR 1352.215-70 - Proposal preparation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... evaluation factor.] Evaluation Factor 1—Technical Approach. Provide information on how the project is to be... time each individual will be available for this project, and, if necessary, explain why the key person... person or labor category including number of labor-hours and current actual average hourly rates based on...
48 CFR 1352.215-70 - Proposal preparation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... evaluation factor.] Evaluation Factor 1—Technical Approach. Provide information on how the project is to be... time each individual will be available for this project, and, if necessary, explain why the key person... person or labor category including number of labor-hours and current actual average hourly rates based on...
Ten Projects to Involve Your Students Directly in French.
ERIC Educational Resources Information Center
van Lent, Peter C.
1981-01-01
Proposes 10 activities to provide French classes of all levels with a broad spectrum of language projects involving direct and active use of French including students polling each other, skits based on television commercials, geographical "show and tell," cooking French dishes, writing a monthly newspaper, and field trips. (BK)
CATSKILL AREA PROJECT IN SMALL SCHOOL DESIGN.
ERIC Educational Resources Information Center
Catskill Area Project in Small School Design, Oneonta, NY.
CHARACTERISTICS OF THE SMALL SCHOOL, AS PROPOSED BY THE PROJECT, ARE LISTED. FIVE AREAS OF SCHOOL OPERATION ARE DISCUSSED IN DETAIL--(1) MULTIPLE CLASSES, INCLUDING SUPERVISED CORRESPONDENCE COURSES, (2) FLEXIBLE SCHEDULES, (3) USE OF SCHOOL AIDES, (4) USES OF ELECTRONIC COMMUNICATION, AND (5) SHARED SERVICES AND TALENTED YOUTH. A MAP LOCATING THE…
Code of Federal Regulations, 2010 CFR
2010-07-01
... Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PREDECISIONAL ADMINISTRATIVE REVIEW PROCESSES Predecisional Administrative Review Process for Hazardous Fuel Reduction Projects Authorized by the Healthy... subject to the objection process pursuant to 36 CFR part 218, subpart A, and include the following: (i...
Returns to Companies on an Investment in Training.
ERIC Educational Resources Information Center
National Centre for Vocational Education Research, Leabrook (Australia).
This paper provides a summary of four projects currently funded through Australia's National Center for Vocational Education Research (NCVER), including what they propose to achieve and their preliminary findings to date. After an introduction, an overview of preliminary findings from the four projects is presented. The following barriers to…
76 FR 19313 - Chequamegon-Nicolet National Forest, Wisconsin, Lakewood Southeast Project
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-07
... area. The project-specific needs include: Reintroduction of natural regimes, wildlife habitat and... for change in: (1) Loss of natural regimes (2) wildlife habitat (3) stream improvement (4) species age... is Township 31-32 North, Range 17 East. The Forest Service proposes to reintroduce natural regimes in...
Code of Federal Regulations, 2010 CFR
2010-10-01
... requirements. An application for a grant under this part for a project under subparts B, C, or D which includes... architectural, structural, and other pertinent characteristics of the building sufficient to show that it is or... project; (3) A detailed estimate of the cost of the proposed acquisition and/or modernization; (4) A...
Garza, Sergio
1983-01-01
Two-dimensional mathematical computer models were developed for aquifer simulation of: (1) Steady-state conditions in a fresh-water system and (2) transient conditions in a brine- fresh-water system where the density effects of the brine are considered. The main results 'of projecting the effects of the proposed Truscott Brine Lake on the fresh-water aquifer are: (1) Hydraulic head rises of 5 to 40 feet would be confined to areas near the proposed dam and along the lake shoreline, and (2) migration of salt water downstream from the dam generally would be limited to less than 1 mile and apparently would not reach equilibrium during the 100-year duration of the project. The modeling efforts did not include possible effects related to hydrodynamic dispersion in the brine- fresh-water system. Possible changes in the hydraulic conductivity of the aquifer, due to physical and chemical interactions in the brine and fresh-water environments, also were not considered.
Libby/Hungry Horse Dams Wildlife Mitigation : Montana Wildlife Habitat Protection : Final Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wood, Marilyn
1992-12-01
The purpose of this project was to develop and obtain information necessary to evaluate and undertake specific wildlife habitat protection/enhancement actions in northwest Montana as outlined in the Columbia River Basin Fish and Wildlife Program. Three waterfowl projects were evaluated between September 1989 and June 1990. Weaver's Slough project involved the proposed acquisition of 200 acres of irrigated farmland and a donated conservation easement on an additional 213 acres. The proposal included enhancement of the agricultural lands by conversion to upland nesting cover. This project was rated the lowest priority based on limited potential for enhancement and no further actionmore » was pursued. The Crow Creek Ranch project involved the proposed acquisition of approximately 1830 acres of grazing and dryland farming lands. The intent would be to restore drained potholes and provide adjacent upland nesting cover to increase waterfowl production. This project received the highest rating based on the immediate threat of subdivision, the opportunity to restore degraded wetlands, and the overall benefits to numerous species besides waterfowl. Ducks Unlimited was not able to participate as a cooperator on this project due to the jurisdiction concerns between State and tribal ownership. The USFWS ultimately acquired 1,550 acres of this proposed project. No mitigation funds were used. The Ashley Creek project involved acquisition of 870 acres adjacent to the Smith Lake Waterfowl Production Area. The primary goal was to create approximately 470 acres of wetland habitat with dikes and subimpoundments. This project was rated second in priority due to the lesser threat of loss. A feasibility analysis was completed by Ducks Unlimited based on a concept design. Although adequate water was available for the project, soil testing indicated that the organic soils adjacent to the creek would not support the necessary dikes. The project was determined not feasible for mitigation implementation. Although no waterfowl/wetland projects were implemented using mitigation funds, 1,550 acres were protected based on work done under this project.« less
NASA Technical Reports Server (NTRS)
Griesel, Martha Ann
1988-01-01
Several Laboratory software development projects that followed nonstandard development processes, which were hybrids of incremental development and prototyping, are being studied. Factors in the project environment leading to the decision to use a nonstandard development process and affecting its success are analyzed. A simple characterization of project environment based on this analysis is proposed, together with software development approaches which have been found effective for each category. These approaches include both documentation and review requirements.
78 FR 65322 - Proposed Data Collections Submitted for Public Comment and Recommendations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-31
... days of this notice. Proposed Project Clostridium difficile Infection (CDI) Surveillance (0920-0892... rate and severity of Clostridium difficile infection (CDI) indicate a clear need to conduct longitudinal assessments to continue to monitor changes in CDI epidemiology, including changes in risk factors...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-03
... Information Collection: Comment Request; Record of Employee Interview AGENCY: Office of Labor Relations... information: Title of Proposal: Record of Employee Interview. OMB Control Number, if applicable: 2501-0009... include conducting interviews with laborers and mechanics employed on HUD-assisted projects concerning...
ERIC Educational Resources Information Center
National Council for Resource Development, Washington, DC.
This document compiles nine papers issued by the National Council for Resource Development. Papers include: (1) "How to Be Successful at Grantsmanship--Guidelines for Proposal Writing--Foundation Proposals"; (2) "A Federal Glossary" (acronyms); (3) "Special Projects" (a working model for an institutional development office); (4) "The Role of the…
76 FR 76165 - Proposed Data Collections Submitted for Public Comment and Recommendations
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-06
...). Background and Brief Description Chronic diseases, including heart disease, cancer, stroke, diabetes... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention [60-Day-12-12BO... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will...
7 CFR 1450.201 - Project area proposal submission requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS BIOMASS CROP... a proposal to CCC that includes, at a minimum: (1) A description of the sources of renewable biomass... commitment from a biomass conversion facility stating that the facility will use, for BCAP purposes, eligible...
7 CFR 1450.201 - Project area proposal submission requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS BIOMASS CROP... a proposal to CCC that includes, at a minimum: (1) A description of the sources of renewable biomass... commitment from a biomass conversion facility stating that the facility will use, for BCAP purposes, eligible...
7 CFR 1450.201 - Project area proposal submission requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS BIOMASS CROP... a proposal to CCC that includes, at a minimum: (1) A description of the sources of renewable biomass... commitment from a biomass conversion facility stating that the facility will use, for BCAP purposes, eligible...
7 CFR 1450.201 - Project area proposal submission requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS BIOMASS CROP... a proposal to CCC that includes, at a minimum: (1) A description of the sources of renewable biomass... commitment from a biomass conversion facility stating that the facility will use, for BCAP purposes, eligible...
78 FR 5812 - Proposed Information Collection Activity; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-28
... Information Collection Activity; Comment Request Proposed Projects Title: Federal Tax Offset, Administrative Offset, and Passport Denial. OMB No.: 0970-0161. The Federal Tax Offset, Administrative Offset, and... payments, including federal tax refunds, of parents who have been ordered to pay child support and who are...
How an impact plan can build on the success of your project - from proposal to legacy
NASA Astrophysics Data System (ADS)
Alexiou, Sofia
2017-04-01
Research Impact is often defined as the 'demonstrable contribution that excellent research makes to society and the economy'. Impact is important as it demonstrates the value of funding agencies' investment into science. Measuring impact is an essential part of project management, from proposal phase to output. However, impact can mean a range of things to different people and organisations. When applying for funding, it is critical to check and understand the type of impact recognised by the relevant funder and to consider opportunities for building in multiple benefits . In 2015, it was observed that the drive to 'get stricter on impact' had a direct effect on the evaluators' instructions and subsequent proposal ratings. As funding agencies are reshaping assessment processes and implementing new indicators of impact and new innovation actions, it is clear that a need to demonstrate performance, impact and added-value must be included within the proposal phase and executed throughout project lifetime.
Using collaborative tools for energy corridor planning.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kuiper, J. A.; Cantwell, B.; Hlohowskyj, I.
2008-01-01
In November 2007, the Draft Programmatic Environmental Impact Statement on Designation of Energy Corridors on Federal Land in the Western 11 States was released. The draft proposes a network of 6055 miles of energy corridors on lands managed by seven different federal agencies. Determining the proposed locations of the corridors was a large collaborative effort among the agencies and included local, state, and federal land managers. To connect this geographically dispersed group of people, the project team employed a variety of approaches to communicate corridor siting issues, including sharing GIS layers and electronic maps, a downloadable GIS database and ArcReadermore » project, workshops, and Internet webcast teleconferences. This collaborative approach allowed difficult siting issues to be understood and discussed from many perspectives, which resulted in rapid and effective decision making. The result was a proposed corridor system that avoids many sensitive resources and protected lands while accommodating expected energy development.« less
Entrepreneurship skills development through project-based activity in Bachelor of Pharmacy program.
Shahiwala, Aliasgar
2017-07-01
To provide pharmacy students with an opportunity to develop entrepreneurial thinking and skills. A business proposal building project-based activity was integrated into a two-credit hour pharmacy management course during the eighth semester of the bachelor of pharmacy degree program. The student groups submitted their proposals, mimicking the process of submitting business proposals and obtaining approval in the real world. Essential management tasks including operation procedures, location and layout design, inventory management, personnel management, marketing management, and finance management were taught step-by-step so that students could work on a similar scenario with their proposal building. Students' career preferences were also measured at the beginning and end of the course. Course was assessed by written exffigam and rubric based project evaluation. Student feedbacks of the project were collected using a five-point Likert scale. The project-based activity was well integrated in the course. The project helped the students (n=72) to understand management concepts more clearly, which was reflected by their significantly higher (p<0.01) grades compared to previous year. Students' feedback was overwhelmingly positive (mean score of 4.53 on the scale of 5). Students developed both interest and confidence to start a pharmacy as a result of this activity. The project was successfully designed and executed in a pharmacy management course within a bachelor of pharmacy curriculum. Based on the response received in this project, efforts will be made to provide guidance and support to the students by calling field experts such as pharmacy owners and financiers. Copyright © 2017 Elsevier Inc. All rights reserved.
Workshop to develop deep-life continental scientific drilling projects
Kieft, T. L.; Onstott, T. C.; Ahonen, L.; ...
2015-05-29
The International Continental Scientific Drilling Program (ICDP) has long espoused studies of deep subsurface life, and has targeted fundamental questions regarding subsurface life, including the following: "(1) What is the extent and diversity of deep microbial life and what are the factors limiting it? (2) What are the types of metabolism/carbon/energy sources and the rates of subsurface activity? (3) How is deep microbial life adapted to subsurface conditions? (4) How do subsurface microbial communities affect energy resources? And (5) how does the deep biosphere interact with the geosphere and atmosphere?" (Horsfield et al., 2014) Many ICDP-sponsored drilling projects have includedmore » a deep-life component; however, to date, not one project has been driven by deep-life goals, in part because geomicrobiologists have been slow to initiate deep biosphere-driven ICDP projects. Therefore, the Deep Carbon Observatory (DCO) recently partnered with the ICDP to sponsor a workshop with the specific aim of gathering potential proponents for deep-life-driven ICDP projects and ideas for candidate drilling sites. Twenty-two participants from nine countries proposed projects and sites that included compressional and extensional tectonic environments, evaporites, hydrocarbon-rich shales, flood basalts, Precambrian shield rocks, subglacial and subpermafrost environments, active volcano–tectonic systems, megafan deltas, and serpentinizing ultramafic environments. The criteria and requirements for successful ICDP applications were presented. Deep-life-specific technical requirements were discussed and it was concluded that, while these procedures require adequate planning, they are entirely compatible with the sampling needs of other disciplines. As a result of this workshop, one drilling workshop proposal on the Basin and Range Physiographic Province (BRPP) has been submitted to the ICDP, and several other drilling project proponents plan to submit proposals for ICDP-sponsored drilling workshops in 2016.« less
Planning and conducting a multi-institutional project on fatigue.
Nail, L M; Barsevick, A M; Meek, P M; Beck, S L; Jones, L S; Walker, B L; Whitmer, K R; Schwartz, A L; Stephen, S; King, M E
1998-09-01
To describe the process used in proposal development and study implementation for a complex multisite project on cancer treatment-related fatigue (CRF), identify strategies used to manage the project, and provide recommendations for teams planning multisite research. Information derived from project team meeting records, correspondence, proposals, and personal recollection. The project was built on preexisting relationships among the three site investigators who then built a team including faculty, research coordinators, staff nurses, and students. Study sites had a range of organizational models, and the proposal was designed to capitalize on the organizational and resource strengths of each setting. Three team members drawn from outside oncology nursing provided expertise in measurement and experience with fatigue in other populations. Planning meetings were critical to the success of the project. Conference calls, fax technology, and electronic mail were used for communication. Flexibility was important in managing crises and shifting responsibility for specific components of the work. The team documented and evaluated the process used for multisite research, completed a major instrumentation study, and developed a cognitive-behavioral intervention for CRF. Accomplishments during the one-year planning grant exceeded initial expectations. The process of conducting multisite research is complex, especially when the starting point is a planning grant with specific research protocols to be developed and implemented over one year. Explicit planning for decision-making processes to be used throughout the project, acknowledging the differences among the study settings and planning the protocols to capitalize upon those differences, and recruiting a strong research team that included a member with planning grant and team-building expertise were essential elements for success. Specific recommendations for others planning multisite research are related to team-building, team membership, communication, behavioral norms, role flexibility, resources, feedback, problem management, and shared recognition.
NASA Technical Reports Server (NTRS)
Rosenberg, L.
1978-01-01
The paper presents an environmental analysis performed in evaluating various proposed geothermal demonstration projects at Desert Hot Springs. These are categorized in two ways: (1) indirect, or (2) direct uses. Among the former are greenhouses, industrial complexes, and car washes. The latter include aquaculture, a cascaded agribusiness system, and a mobile home park. Major categories of environmental impact covered are: (1) site, (2) construction of projects, and (3) the use of the geothermal source. Attention is also given to the disposal of the geothermal fluid after use. Finally, it is concluded that there are no major problems forseen for each project, and future objectives are discussed.
NASA Technical Reports Server (NTRS)
Best, R. G.; Moore, D. G.; Myers, V. I.
1977-01-01
An inventory of wetlands for the area included in the proposed Oahe irrigation project was conducted to provide supplemental data for the wildlife mitigation plan. Interpretation techniques for inventoring small wetlands in the low relief terrain of the Lake Dakota Plain were documented and data summaries included. The data were stored and tabulated in a computerized spatial data analysis system.
Environmental Study Plan for the Trinity River Basin, Texas
1972-01-01
with the requirements of NEPA, as specified In Sec. 102. These requirements Include the utilization of "a systematic, interdisciplinary approach which...and making updated completion projections is therefore included (Appendix F). B. Basic approach of the proposed study. The proposed study is divided...different from the customary approach utilized by many research specialists. Some of these differences are discussed below. I. The study is not intended
ALMA from the Users' Perspective
NASA Astrophysics Data System (ADS)
Johnson, Kelsey
2010-05-01
After decades of dreaming and preparation, the call for early science with ALMA is just around the corner. The goal of this talk is to illustrate the process of preparing and carrying out a research program with ALMA. This presentation will step through the user interface for proposal preparation, proposal review, project tracking, data acquisition, and post-processing. Examples of the software tools, including the simulator and spectral line catalog, will be included.
75 FR 44799 - Proposed Data Collections Submitted for Public Comment and Recommendations
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-29
... the survey design. NHANES data users include the U.S. Congress; the World Health Organization.... Proposed Project The National Health and Nutrition Examination Survey (NHANES)--(OMB No. 0920-0237 exp. 12... activities for 2013-2014 data collection. The National Health and Nutrition Examination Survey (NHANES) was...
48 CFR 1552.215-72 - Instructions for the Preparation of Proposals.
Code of Federal Regulations, 2011 CFR
2011-10-01
... used. If escalation is included, state the degree (percent) and methodology. The methodology shall.... If so, state the number required, the professional or technical level and the methodology used to... for which the salary is applicable; (C) List of other research Projects or proposals for which...
78 FR 50432 - Agency Information Collection Activities: Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-19
... capabilities. The EMPG Work Plan narrative must demonstrate how proposed projects address gaps, deficiencies.... hourly respondent respondents respondent of responses (in hours) hours) wage rate cost State, Local or.... Hourly Wage Rate'' for each respondent includes a 1.4 multiplier to reflect a fully-loaded wage rate...
Data-Linking Requirements in Facilities Condition Audit RFPs.
ERIC Educational Resources Information Center
DeFranco, Randall W.
2002-01-01
Discusses why, when preparing a Request for Proposal (RFP) for Facilities Condition Audit (FCA)--including software-based delivery of findings--facilities managers should avoid complicating the bidding process with nondescript data-linking requirements. Presents ways to get an apples-to-apples comparison of bids for a proposed FCA project and…
7 CFR 3406.13 - Content of a teaching proposal.
Code of Federal Regulations, 2010 CFR
2010-01-01
... design or a main thesis of the proposal, such information may be included in an Appendix. Examples of....13 Agriculture Regulations of the Department of Agriculture (Continued) COOPERATIVE STATE RESEARCH... for the applicant institution. (3) The title of the teaching project shown on the “Higher Education...
78 FR 35942 - Proposed Collection; Comment Request: Palliative Care: Conversations Matter Evaluation
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-14
... of Management and Budget (OMB) for review and approval. Written comments and/or suggestions from the... instruments, submit comments in writing, or request more information on the proposed project, contact Ms...) 496-0256, or Email your request, including your address to: [email protected] . Comments...
78 FR 59036 - Proposed Data Collections Submitted for Public Comment and Recommendations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-25
... mail interviews. Questions related to federal and state health insurance marketplaces will be included... days of this notice. Proposed Project National Health Interview Survey (NHIS), (OMB No. 0920-0214... population of the United States. The annual National Health Interview Survey is a major source of general...
Budget boosts overall research but cuts NOAA and USGS funds
NASA Astrophysics Data System (ADS)
Richman, Barbara T.
Science in general, and physical sciences in particular, show growth far above projected inflation in President Ronald Reagan's fiscal 1984 budget proposal. Total funding requested for all federal research and development, including facilities, is $47 billion, up 17.2% over fiscal 1983, jumping hurdles over the 5% projected inflation rate. Defense R&D is slated to soar 29% to $30.3 billion, while non-defense R&D would rise 0.4% to $16.7 billion. Table 1 shows the proposed research and development budgets by major departments and agencies.
Proposed Bak Stabilization Tennessee River, River Mile 466.2 - 466.5 Hamilton County, Tennessee
2013-04-01
Project Planning Branch EA Preparation Mitzy Schaney, Archaeologist Project Planning Branch Cultural Resources Preparation Ramune Morales, Project...addressed in our evaluation. Please contact Mitzy L. Schaney at (615) 736-2268 or mitzy.l.schaney@usace.army.mil if you require additional...of the phased compliance approach. Also include any concerns you would like addressed in our evaluation. Please contact Mitzy L. Schaney at (615) 736
Mytko, Christine
2018-05-18
A group of seventh graders from Black Pine Circle school in Berkeley had the opportunity to experience the Advanced Light Source (ALS) as "users" via a collaborative field trip and proposal project. The project culminated with a field trip to the ALS for all seventh graders, which included a visit to the ALS data visualization room, a diffraction demonstration, a beamline tour, and informative sessions about x-rays and tomography presented by ALS scientists.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mytko, Christine
2014-03-31
A group of seventh graders from Black Pine Circle school in Berkeley had the opportunity to experience the Advanced Light Source (ALS) as "users" via a collaborative field trip and proposal project. The project culminated with a field trip to the ALS for all seventh graders, which included a visit to the ALS data visualization room, a diffraction demonstration, a beamline tour, and informative sessions about x-rays and tomography presented by ALS scientists.
Internationalizing the Business Communication Curriculum.
ERIC Educational Resources Information Center
Sturges, David L.
1992-01-01
Proposes a course in business communication that includes international or global perspectives in its philosophy, content, and assignments. Includes a syllabus, a scheme describing how the course is taught, a communication audit plan, a capstone project, and a sample reading list. (SR)
Future Mission Proposal Opportunities: Discovery, New Frontiers, and Project Prometheus
NASA Technical Reports Server (NTRS)
Niebur, S. M.; Morgan, T. H.; Niebur, C. S.
2003-01-01
The NASA Office of Space Science is expanding opportunities to propose missions to comets, asteroids, and other solar system targets. The Discovery Program continues to be popular, with two sample return missions, Stardust and Genesis, currently in operation. The New Frontiers Program, a new proposal opportunity modeled on the successful Discovery Program, begins this year with the release of its first Announcement of Opportunity. Project Prometheus, a program to develop nuclear electric power and propulsion technology intended to enable a new class of high-power, high-capability investigations, is a third opportunity to propose solar system exploration. All three classes of mission include a commitment to provide data to the Planetary Data System, any samples to the NASA Curatorial Facility at Johnson Space Center, and programs for education and public outreach.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-02
..., modifications to 4 existing substations, a 345-kV switchyard, maintenance access roads, temporary construction... will address the construction, operation, and maintenance of Basin Electric's proposed Project. The Project includes construction, operation and maintenance of approximately 190 miles of new 345-kV single...
34 CFR 643.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2010 CFR
2010-07-01
... POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION TALENT SEARCH How Does the Secretary Make a Grant? § 643.21... need for a Talent Search project in the proposed target area on the basis of the extent to which the... a Talent Search project, including the presence of unaddressed academic or socio-economic problems...
75 FR 18231 - Central Utah Project Completion Act
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-09
... a proposed conversion of up to 12,100 acre feet of Central Utah Project (CUP) Bonneville Unit water... that has been made available under Block Notice 1A of the CUP. The delivery area could be expanded to include additional land in Wasatch County. The Bonneville Unit of the CUP was authorized to develop a...
40 CFR Appendix A to Subpart L - Criteria for Evaluating a State's Proposed NEPA-Like Process
Code of Federal Regulations, 2012 CFR
2012-07-01
... consider: (1) Designation of a study area comparable to the final system; (2) A range of feasible... conditions; (5) Land use and other social parameters including relevant recreation and open-space..., institutional, and industrial) within the project study area; and (8) Other anticipated public works projects...
40 CFR Appendix A to Subpart L - Criteria for Evaluating a State's Proposed NEPA-Like Process
Code of Federal Regulations, 2010 CFR
2010-07-01
... consider: (1) Designation of a study area comparable to the final system; (2) A range of feasible... conditions; (5) Land use and other social parameters including relevant recreation and open-space..., institutional, and industrial) within the project study area; and (8) Other anticipated public works projects...
40 CFR Appendix A to Subpart L - Criteria for Evaluating a State's Proposed NEPA-Like Process
Code of Federal Regulations, 2011 CFR
2011-07-01
... consider: (1) Designation of a study area comparable to the final system; (2) A range of feasible... conditions; (5) Land use and other social parameters including relevant recreation and open-space..., institutional, and industrial) within the project study area; and (8) Other anticipated public works projects...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-19
... (1980, as amended), for the Calico Solar (formerly Stirling Energy Systems Solar One) Project, San... (LWCF). The project proposal includes building about 34,000, 25-kilowatt Stirling solar dish systems. Each solar dish system consists of an approximately 38-foot high by 40-foot wide solar concentrator...
ALPBP Project Research Component: Summary of Research Findings and Final Reports.
ERIC Educational Resources Information Center
Rivera, Charlene
This report summarizes the Assessment of Language Proficiency of Bilingual Persons (ALPBP) project research component and provides a summary of the findings of the other six components of the study. The summary of the research component includes an outline of the goals, activities, and requests for proposals. After the introduction, the following…
Project TRAIN, 1984-1985. OEA Evaluation Report.
ERIC Educational Resources Information Center
New York City Board of Education, Brooklyn. Office of Educational Assessment.
Project TRAIN, in its first year of operation, proposed to offer 210 parents of New York City high school students of limited English proficiency (LEP) an opportunity to improve their own English language skills. The targeted language groups included Spanish, Haitian Creole, Khmer, and Korean. This was to have been achieved through regularly…
Future particle-physics projects in the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Denisov, D. S., E-mail: denisovd@fnal.gov
2015-07-15
Basic proposals of experiments aimed at precision measurements of Standard Model parameters and at searches for new particles, including dark-matter particles, are described along with future experimental projects considered by American Physical Society at the meeting in the summer of 2013 and intended for implementation within the next ten to twenty years.
Future particle-physics projects in the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Denisov, D. S.
2015-08-25
Basic proposals of experiments aimed at precision measurements of Standard Model parameters and at searches for new particles, including dark-matter particles, are described along with future experimental projects considered by American Physical Society at the meeting in the summer of 2013 and intended for implementation within the next ten to twenty years.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Spiering, Colleen
2001-11-15
BPA proposes to fund a project with the Colville Confederated Tribes that will improve spawning and rearing specifically for summer steelhead in the Omak Creek Watershed. Efforts to achieve this objective include improved livestock and forestry management and barrier removal. These techniques include exclusionary fencing, spring developments, hardened-rock crossings, road decommissioning, culvert removal and placement, riparian vegetation planting and installation of instream structures. The result of implementing these techniques will reduce fine sediment delivered to the stream channel which will result in increased hatching success of summer steelhead. Also, reestablishing riparian vegetation will provide canopy and enclose the stream channelmore » resulting in reduced stream temperatures. Two “on-the-ground” projects are proposed for this year. One project consists of installing three instream structures and planting riparian vegetation to provide bank stability along approximately 200’ of privately owned stream bank of Omak Creek. Also a fence will be constructed to exclude the landowner’s horses. The second project consists of removal of an inadequate sized culvert (5’ diameter) and replacement with a larger bottomless arch (6’ x 12’). This project will also include seven instream structures to stabilize the stream bank both upstream and downstream of the culvert and direct flows through the center of the bottomless arch.« less
Secure and Robust Iris Recognition Using Random Projections and Sparse Representations.
Pillai, Jaishanker K; Patel, Vishal M; Chellappa, Rama; Ratha, Nalini K
2011-09-01
Noncontact biometrics such as face and iris have additional benefits over contact-based biometrics such as fingerprint and hand geometry. However, three important challenges need to be addressed in a noncontact biometrics-based authentication system: ability to handle unconstrained acquisition, robust and accurate matching, and privacy enhancement without compromising security. In this paper, we propose a unified framework based on random projections and sparse representations, that can simultaneously address all three issues mentioned above in relation to iris biometrics. Our proposed quality measure can handle segmentation errors and a wide variety of possible artifacts during iris acquisition. We demonstrate how the proposed approach can be easily extended to handle alignment variations and recognition from iris videos, resulting in a robust and accurate system. The proposed approach includes enhancements to privacy and security by providing ways to create cancelable iris templates. Results on public data sets show significant benefits of the proposed approach.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keller, Carl J.
2004-07-13
BPA proposes to fund IDFG to plan and complete construction of fish passage improvements and water conservation activities that are contained within IDFG’s Statement of Work (SOW) for the period 7/1/04 to 6/30/05. The funding request contained in their SOW is part of an ongoing IDFG effort to fund anadromous fish passage projects that fall outside the scope of the Mitchell Act. The proposed SOW activities fall within the following four categories: Phase I-Planning and Design (gather data, perform investigations, and exchange information; perform surveys and assessments to be compliant; survey project sites and perform engineering designs; perform contract andmore » project management); Phase II-Construction and Implementation (procure materials and supplies, prepare contracts and solicit bids, plant native seedlings, complete capital improvements); Phase III-Operation and Maintenance (maintain office operations); and Phase IV- Monitoring and Evaluation (monitor and evaluate post-project effects, reporting). The SOW culminates with proposed construction of 18 capital improvement projects (Table 1 attached). The types of capital improvements include: screening gravity water diversions; consolidating and/or eliminating ditches; evaluating and screening pump diversions; evaluating and implementing water conservation activities; constructing screens along migration routes and rearing areas for hatchery and wild salmon; improving upstream and downstream passage for anadromous fish; and maximize benefits to aquatic habitat. Because each of the proposed projects in the SOW is still in the planning stages, the specifics of each still need to be completed.« less
Proposed Columbia Wind Farm No. 1 : Draft Environmental Impact Statement, Joint NEPA/SEPA.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Klickitat County
1995-03-01
This Draft Environmental Impact Statement (DEIS) addresses the Columbia Wind Farm {number_sign}1 (Project) proposal for construction and operation of a 25 megawatt (MW) wind power project in the Columbia Hills area southeast of Goldendale in Klickitat County, Washington. The Project would be constructed on private land by Conservation and Renewable Energy System (CARES) (the Applicant). An Environmental Impact Statement is required under both NEPA and SEPA guidelines and is issued under Section 102 (2) (C) of the National Environmental Policy Act (NEPA) at 42 U.S.C. 4321 et seq and under the Washington State Environmental Policy Act (SEPA) as provided bymore » RCW 43.21C.030 (2) (c). Bonneville Power Administration is the NEPA lead agency; Klickitat County is the nominal SEPA lead agency and CARES is the SEPA co-lead agency for this DEIS. The Project site is approximately 395 hectares (975 acres) in size. The Proposed Action would include approximately 91 model AWT-26 wind turbines. Under the No Action Alternative, the Project would not be constructed and existing grazing and agricultural activities on the site would continue.« less
"GSFC FSB Application of Perspective-Based Inspections"
NASA Technical Reports Server (NTRS)
Shell, Elaine; Shull, Forrest
2004-01-01
The scope of work described in our proposal consisted of developing inspection standards targeted to Branch-specific types of defects (gained from analysis of Branch project defect histories), and including Branch-relevant perspectives and questions to guide defect detection. The tailored inspection guidelines were to be applied on real Branch projects with support as needed from the technology infusion team. This still accurately describes the scope of work performed. It was originally proposed that the Perspective-Based inspection standard would be applied on three projects within the Branch: GPM, JWST, and SDO. Rather than apply the proposed standard to all three, we inserted a new step, in which the standard was instead applied on a single pilot project, cFE (described above). This decision was a good match for the Branch goals since, due to the "design for reuse" nature of cFE, inspections played an even more crucial than usual role in that development process. Also, since cFE is being designed to provide general-purpose functionality, key representatives fiom our target projects were involved in inspections of cFE to provide perspectives from different missions. In this way, they could get some exposure to and the chance to provide feedback on the proposed standards before applying them on their own projects. The Branch-baselined standards will still be applied on GPM, JWST, and SDO, although outside the time frame of this funding. Finally, we originally proposed using the analysis of Branch defect sources to indicate in which phases Perspective-Based inspections could provide the best potential for future improvement, although experience on previous Branch projects suggested that our efforts would likely be focused on requirements and code inspections. In the actual work, we focused exclusively on requirements inspections, as this was the highest-priority work currently being done on our cFE pilot project.
Facilities for US Radioastronomy.
ERIC Educational Resources Information Center
Thaddeus, Patrick
1982-01-01
Discusses major developments in radioastronomy since 1945. Topics include proposed facilities, very-long-baseline interferometric array, millimeter-wave telescope, submillimeter-wave telescope, and funding for radioastronomy facilities and projects. (JN)
Code of Federal Regulations, 2012 CFR
2012-10-01
... reference in this part to grants includes cooperative agreements) for biomedical and behavioral research; and (2) Biomedical and behavioral research and development contract project concepts and proposals for...
Code of Federal Regulations, 2011 CFR
2011-10-01
... reference in this part to grants includes cooperative agreements) for biomedical and behavioral research; and (2) Biomedical and behavioral research and development contract project concepts and proposals for...
Code of Federal Regulations, 2013 CFR
2013-10-01
... reference in this part to grants includes cooperative agreements) for biomedical and behavioral research; and (2) Biomedical and behavioral research and development contract project concepts and proposals for...
Code of Federal Regulations, 2014 CFR
2014-10-01
... reference in this part to grants includes cooperative agreements) for biomedical and behavioral research; and (2) Biomedical and behavioral research and development contract project concepts and proposals for...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hathcock, Charles Dean
The proposed action being assessed in this document occurs in TA-02 in the bottom of Los Alamos Canyon. The DOE proposes to conduct soil sampling at AOC 02-011 (d), AOC 02- 011(a)(ii), and SWMU 02-005, and excavate soils in AOC 02-011(a)(ii) as part of a corrective actions effort. Additional shallow surface soil samples (soil grab samples) will be collected throughout the TA-02 area, including within the floodplain, to perform ecotoxicology studies (Figures 1 and 2). The excavation boundaries in AOC 02-011(a)(ii) are slightly within the delineated 100-year floodplain. The project will use a variety of techniques for soil sampling andmore » remediation efforts to include hand/digging, standard hand auger/sampling, excavation using machinery such as backhoe and front end loader and small drill rig. Heavy equipment will traverse the floodplain and spoils piles will be staged in the floodplain within developed or previously disturbed areas (e.g., existing paved roads and parking areas). The project will utilize and maintain appropriate best management practices (BMPs) to contain excavated materials, and all pollutants, including oil from machinery/vehicles. The project will stabilize disturbed areas as appropriate at the end of the project.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-15
... proposed DSSF which includes a 550-megawatt (MW) solar photovoltaic (PV) facility and associated 220... Holdings, LLC, Desert Sunlight Solar Farm and Proposed California Desert Conservation Area Plan Amendment... Desert Sunlight Solar Farm (DSSF) project and by this notice is announcing its availability. DATES: The...
50 CFR 84.22 - What needs to be included in grant proposals?
Code of Federal Regulations, 2010 CFR
2010-10-01
... need within the purposes of the Act; (2) Discrete, quantifiable, and verifiable objective(s) to be... waters, the hydrology, water quality, or fish and wildlife dependent on the wetlands; (4) The approach to... the proposal, and a map of the project site; (6) Estimated costs to attain the objective(s) (the...
50 CFR 84.22 - What needs to be included in grant proposals?
Code of Federal Regulations, 2011 CFR
2011-10-01
... need within the purposes of the Act; (2) Discrete, quantifiable, and verifiable objective(s) to be... waters, the hydrology, water quality, or fish and wildlife dependent on the wetlands; (4) The approach to... the proposal, and a map of the project site; (6) Estimated costs to attain the objective(s) (the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-04
... be supplemented with internal access/service roads to each wind turbine. Proposed ancillary... action alternatives, project features within the wind-farm site would include turbines aligned within... maximum of 283 turbines. The Alternative B wind-farm site would encompass approximately 30,872 acres of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-05
... the proposed Project may include access roads, wind turbine assembly lay down areas, overhead and... to an incidental take permit (ITP) application that Champlin Hawaii Wind Holdings, LLC (Champlin...) near Kahuku, Hawaii, for production of wind-generated electrical energy on the island of Oahu. In...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-19
... List for a Programmatic Agreement for Managing Properties Included in or Eligible for Inclusion in the..., or eligible for inclusion in, the National Register of Historic Places at the proposed Lake... for the above-captioned proceedings may request inclusion on the restricted service list, or may...
78 FR 54471 - Proposed Data Collections Submitted for Public Comment and Recommendations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-04
... days of this notice. Proposed Project World Trade Center Health Program Enrollment & Appeals--Pentagon... information includes the definition of each population: A Pentagon responder is someone who was a member of a... number, date of birth, and gender. The World Trade Center Health Program (WTCHP) expects to receive...
Final Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
2000-06-30
This EIS assesses environmental issues associated with constructing and demonstrating a project that would be cost-shared by DOE and JEA (formerly the Jacksonville Electric Authority) under the Clean Coal Technology Program. The project would demonstrate circulating fluidized bed (CFB) combustion technology at JEA's existing Northside Generating Station in Jacksonville, Florida, about 9 miles northeast of the downtown area of Jacksonville. The new CFB combustor would use coal and petroleum coke to generate nearly 300 MW of electricity by repowering the existing Unit 2 steam turbine, a 297.5-MW unit that has been out of service since 1983. The proposed project ismore » expected to demonstrate emission levels of sulfur dioxide (SO{sub 2}), oxides of nitrogen (NO{sub x}), and particulate matter that would be lower than Clean Air Act limits while at the same time producing power more efficiently and at less cost than conventional coal utilization technologies. At their own risk, JEA has begun initial construction activities without DOE funding. Construction would take approximately two years and, consistent with the original JEA schedule, would be completed in December 2001. Demonstration of the proposed project would be conducted during a 2-year period from March 2002 until March 2004. In addition, JEA plans to repower the currently operating Unit 1 steam turbine about 6 to 12 months after the Unit 2 repowering without cost-shared funding from DOE. Although the proposed project consists of only the Unit 2 repowering, this EIS analyzes the Unit 1 repowering as a related action. The EIS also considers three reasonably foreseeable scenarios that could result from the no-action alternative in which DOE would not provide cost-shared funding for the proposed project. The proposed action, in which DOE would provide cost-shared finding for the proposed project, is DOE's preferred alternative. The EIS evaluates the principal environmental issues, including air quality, traffic, noise, and ecological resources, that could result from construction and operation of the proposed project. Key findings include that maximum modeled increases in ground-level concentrations of SO{sub 2} nitrogen dioxide (NO{sub 2}), and particulate matter (for the proposed project alone or in conjunction with the related action) would always be less than 10% of their corresponding standards for increases in pollutants. For potential cumulative air quality impacts, results of modeling regional sources and the proposed project indicate that the maximum 24-hour average SO{sub 2} concentration would closely approach (i.e., 97%) but not exceed the corresponding Florida standard. After the Unit 1 repowering, results indicate that the maximum 24-hour average SO{sub 2} concentration would be 91% of the Florida standard. Concentrations for other averaging periods and pollutants would be lower percentages of their standards. Regarding toxic air pollutants from the proposed project, the maximum annual cancer risk to a member of the public would be approximately 1 in 1 million; given the conservative assumptions in the estimate, the risk would probably be less. With regard to threatened and endangered species, impacts to manatees, gopher tortoises, and other species would be negligible or non-existent. Construction-induced traffic would result in noticeable congestion. In the unlikely event that all coal were transported by rail, up to 3 additional trains per week would exacerbate impacts associated with noise, vibration, and blocked roads at on-grade rail crossings. Additional train traffic could be minimized by relying more heavily on barges and ships for coal transport, which is likely to be a more economic fuel delivery mode. During construction of the proposed project, noise levels would increase from the current operational levels. Except possibly during steam blowouts and possibly during operation of equipment used to construct a nearby segment of a conveyor, construction noise should not appreciably affect the background noise of nearby residences or exceed local noise limitations. The preferred alternative for management of the combustion ash would be to sell it as a by-product to offsite customers. If more than approximately 70% of the ash could be sold over the 30-year lifetime of Northside Generating Station, the 40-acre storage site would be sufficient for complete containment.« less
75 FR 4567 - Proposed Data Collections Submitted for Public Comment and Recommendations
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-28
... technology. Written comments should be received within 60 days of this notice. Proposed Project Minority HIV... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or...
75 FR 67375 - Proposed Data Collections Submitted for Public Comment and Recommendations
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-02
... information technology. Written comments should be received within 60 days of this notice. Proposed Project... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or...
75 FR 61762 - Proposed Data Collections Submitted for Public Comment and Recommendations
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-06
... technology. Written comments should be received within 60 days of this notice. Proposed Project HIV/AIDS... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or...
75 FR 8364 - Proposed Data Collections Submitted for Public Comment and Recommendations
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-24
... technology. Written comments should be received within 60 days of this notice. Proposed Project National... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or...
75 FR 43984 - Proposed Data Collections Submitted for Public Comment and Recommendations
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-27
... technology. Written comments should be received within 60 days of this notice. Proposed Project National... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or...
76 FR 6139 - Proposed Data Collections Submitted for Public Comment and Recommendations
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-03
... technology. Written comments should be received within 60 days of this notice. Proposed Project Community... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matsuoka, J.K; Minerbi, L.; Kanahele, P.
This report makes available and archives the background scientific data and related information collected for an ethnographic study of selected areas on the islands of Hawaii and Maui. The task was undertaken during preparation of an environmental impact statement for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. Information is included on the ethnohistory of Puna and southeast Maui; ethnographic fieldwork comparingmore » Puna and southeast Maui; and Pele beliefs, customs, and practices.« less
Ada (trademark) projects at NASA. Runtime environment issues and recommendations
NASA Technical Reports Server (NTRS)
Roy, Daniel M.; Wilke, Randall W.
1988-01-01
Ada practitioners should use this document to discuss and establish common short term requirements for Ada runtime environments. The major current Ada runtime environment issues are identified through the analysis of some of the Ada efforts at NASA and other research centers. The runtime environment characteristics of major compilers are compared while alternate runtime implementations are reviewed. Modifications and extensions to the Ada Language Reference Manual to address some of these runtime issues are proposed. Three classes of projects focusing on the most critical runtime features of Ada are recommended, including a range of immediately feasible full scale Ada development projects. Also, a list of runtime features and procurement issues is proposed for consideration by the vendors, contractors and the government.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1982-01-01
The WyCoal Project Village is a housing facility proposed adjacent to the Wyoming Coal Gasification Project plant construction site that would accommodate single workers in dormitory units and singles or couples at a recreation vehicle park. Centralized services and recreational facilities are also to be provided. The provision for some mobile home units to be used in lieu of RV spaces has been considered but would be developed only if a strong demonstrated demand from singles and couples required such a provision. No children will be allowed at the Project Village as accommodations for families will be available in themore » town of Douglas. The development program for the Project Village calls for a total plan capacity of 225 living units: 1500 dormitory rooms and 750 recreational vehicle spaces. However, the total units to be developed will not exceed 1800 with peak employment, including couples at the Recreational Vehicle Park, not anticipated to exceed 2000. The flexibility within the maximum plan capacity of 2250 will allow for the development of an appropriate balance of housing units geared to the on-site project demands as plant construction occurs. At this time a mix of approximately 1200 dormitory rooms and 600 RV spaces appears appropriate for planning purposes.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
... related to tax assessment, property sale, easement, lien, land use and condition. The objectives of the project are to: Create a standardized database that can be used by HUD; and Assess the feasibility of... of the collection of information on those who are to respond; including through the use of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-20
... County, NM; Taos Ski Valley's 2010 Master Development Plan--Phase 1 Projects; Additional Filings AGENCY... environmental impact statement for a proposal to authorize several (Phase 1) projects included in the Taos Ski... (ROD) are expected in July 2012. Change in Responsible Official: In addition, this notice changes the...
2011-08-01
4 Body ...Report requirement. 5 Body The approved Statement of Work proposed the following timeline (Table 1): Table 1. Timeline for approved project...Figure 1) were tested for this project including the 1E90 Sprinter (OttoBock Inc.), Flex-Run (Ossur), Cheetah ® (Ossur) and Nitro Running Foot (Freedom
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-14
... River Estuary Restoration Project, South San Diego Bay Unit of the San Diego Bay National Wildlife...), intend to prepare an environmental impact statement (EIS) for the proposed Otay River Estuary Restoration... any one of the following methods. Email: [email protected] . Please include ``Otay Estuary NOI'' in the...
75 FR 39693 - 60-Day Notice; Agency Information Collection Request; 60-Day Public Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-12
... within 60 days. Proposed Project: Uniform Data Set (UDS)--Revision--OMB No. 0990- 0275--Office of Public... OMB approved Uniform Data Set (OMB No. 0990-0275), the tool used by OMH to collect program management and performance data for all OMH-funded projects. Respondents for this data collection include the...
ICT Training of University Teachers in a Personal Learning Environment. Project DIPRO 2.0.
ERIC Educational Resources Information Center
Cabero Almenara, Julio; Marín Díaz, Verónica
2012-01-01
Developing an information and knowledge society involves the incorporation of technological tools into education. This can only happen if teachers are properly qualified to include such tools into the classroom dynamics. The present article brings to the forefront a training proposal framed within an R&D project funded by the Spanish Ministry…
76 FR 28729 - Tehama County Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-18
... the title II of the Act. The meeting is open to the public. The purpose of the meeting is to vote on project proposals and to discuss a project monitoring field visit. DATES: The meeting will be held on May.... SUPPLEMENTARY INFORMATION: The meeting is open to the public. Agenda items to be covered include: (1...
ERIC Educational Resources Information Center
Abbott, Christine; Weiss, Michael
2016-01-01
The notion of action learning driven innovation is explored with reference to three action-learning projects carried out in the last year and a proposed multi stakeholder project starting in 2016. The authors also provide an account of "innovation", including its rationale and characteristics, and argues for its particular suitability in…
Dynamic Scheduling for Web Monitoring Crawler
2009-02-27
researches on static scheduling methods , but they are not included in this project, because this project mainly focuses on the event-driven...pages from public search engines. This research aims to propose various query generation methods using MCRDR knowledge base and evaluates them to...South Wales Professor Hiroshi Motoda/Osaka University Dr. John Salerno, Air Force Research Laboratory/Information Directorate Report
20% Research & Design Science Project
NASA Astrophysics Data System (ADS)
Spear, Beth A.
2015-04-01
A project allowing employees to use 15 % of their time on independent projects was established at 3M in the 1950's. The result of this project included products like post it notes and masking tape. Google allows its employees to use 20% of their time on independently pursued projects. The company values creativity and innovation. Employees are allowed to explore projects of interest to them one day out of the week, 20 % of their work week. Products like AdSense, Gmail, Google Transit, Google News, and Google Talk are the result of this 20 % program. My school is implementing the Next Generation Science Standards (NGSS) as part of our regularly scheduled curriculum review. These new standards focus on the process of learning by doing and designing. The NGSS are very hands on and active. The new standards emphasize learning how to define, understand and solve problems in science and technology. In today's society everyone needs to be familiar with science and technology. This project allows students to develop and practice skills to help them be more comfortable and confident with science and technology while exploring something of interest to them. This project includes three major parts: research, design, and presentation. Students will spend approximately 2-4 weeks defining a project proposal and educating themselves by researching a science and technology topic that is of interest to them. In the next phase, 2-4 weeks, students design a product or plan to collect data for something related to their topic. The time spent on research and design will be dependant on the topic students select. Projects should be ambitious enough to encompass about six weeks. Lastly a presentation or demonstration incorporating the research and design of the project is created, peer reviewed and presented to the class. There are some problems anticipated or already experienced with this project. It is difficult for all students to choose a unique topic when you have large class sizes. Some students find it painful to design something independently as they are used to being told what to do. Assessing the projects, which include a wide degree of ambition established within the proposal, can be challenging. Implementation of this project requires the loss of approximately 20 % of class time. This can be a challenge when class time is already at a premium. However; the benefits of this project outweigh the loss of instructional time. This project is student centered and allows each student to pursue a topic of interest to them. This ability to choose their own topic allows students to explore with very few boundaries to confine their imagination. The project allows students to propose an ambitious project. The option for failure with the design portion of the project allows them to learn that failure is not always negative and can provide many learning opportunities, much like real world situations. This project is aligned with the NGSS encouraging creativity and innovation through unique, authentic investigations in science and technology.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Petrosky, Charles E.; Holubetz, Terry B.
The Idaho Department of Fish and Game has been monitoring and evaluating existing and proposed habitat improvement projects for steelhead (Salmo gairdneri) and chinook salmon (Oncorhynchus tshawytscha) in the Clearwater and Salmon River drainages over the last four years. Projects included in the evaluation are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia rivers. A mitigation record is being developed to use increased smolt production at full seeding as the best measure of benefit from a habitat enhancementmore » project. Determination of full benefit from a project depends on presence of adequate numbers of fish to document actual increases in fish production. The depressed nature of upriver anadromous stocks have precluded attainment of full benefit of any habitat project in Idaho. Partial benefit will be credited to the mitigation record in the interim period of run restoration. According to the BPA Work Plan, project implementors have the primary responsibility for measuring physical habitat and estimating habitat change. To date, Idaho habitat projects have been implemented primarily by the US Forest Service (USFS). The Shoshone-Bannock Tribes (SBT) have sponsored three projects (Bear Valley Mine, Yankee Fork, and the proposed East Fork Salmon River projects). IDFG implemented two barrier-removal projects (Johnson Creek and Boulder Creek) that the USFS was unable to sponsor at that time. The role of IDFG in physical habitat monitoring is primarily to link habitat quality and habitat change to changes in actual, or potential, fish production. Individual papers were processed separately for the data base.« less
Barthell, Edward N; Cordell, William H; Moorhead, John C; Handler, Jonathan; Feied, Craig; Smith, Mark S; Cochrane, Dennis G; Felton, Christopher W; Collins, Michael A
2002-04-01
The Frontlines of Medicine Project is a collaborative effort of emergency medicine (including emergency medical services and clinical toxicology), public health, emergency government, law enforcement, and informatics. This collaboration proposes to develop a nonproprietary, "open systems" approach for reporting emergency department patient data. The common element is a standard approach to sending messages from individual EDs to regional oversight entities that could then analyze the data received. ED encounter data could be used for various public health initiatives, including syndromic surveillance for chemical and biological terrorism. The interlinking of these regional systems could also permit public health surveillance at a national level based on ED patient encounter data. Advancements in the Internet and Web-based technologies could allow the deployment of these standardized tools in a rapid time frame.
NASA Technical Reports Server (NTRS)
Dethloff, Henry C.
2001-01-01
The KSC History Project focuses on archival research and oral history interviews on the history of Kennedy Space Center (KSC). Related projects include the preparation of a precis and chapter outline for a proposed book-length narrative history, a bibliography of key primary and secondary resources, a brief monograph overview of the history of KSC, and a monograph on the history of safety at the Center. Finally, there is work on the development of a web page and a personal history data base associated with the oral history project. The KSC History Project has been a joint endeavor between Henry C. Dethloff and Dr. Noble Lee Snaples, Jr.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-06-01
In response to a request from the Association of Southeast Asian Nations (ASEAN), the U.S. Trade and Development Program (TDP) conducted a definitional mission to evaluate the prospects of TDP funding for five Power Interconnection Projects in the ASEAN region. These projects included: Batam-Singapore Interconnection; Sumatera-Peninsular Malaysia Interconnection; Sarawak-West Kalimantan Interconnection; Sarawak-Brunei-Sabah Interconnection; and Java-Sumatera Interconnection. Based on a review of the proposed scopes of work for the projects and the discussions in the field, the report summarizes the technical details and the costs of implementation for the projects.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-03
... for the Proposed Campo Regional Landfill Project on the Campo Indian Reservation, San Diego County, CA... proposed Campo Regional Landfill Project (Proposed Action) to be located on the Campo Indian Reservation... Landfill Project (Proposed Action). There is no Federal action of amended lease and amended sublease...
Magnetic Fields on the National Ignition Facility (MagNIF)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mason, D.; Folta, J.
2016-08-12
A magnetized target capability on the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) has been investigated. Stakeholders’ needs and project feasibility analysis were considered in order to down-select from a wide variety of different potential magnetic field magnitudes and volumes. From the large range of different target platforms, laser configurations, and diagnostics configurations of interest to the stakeholders, the gas-pipe platform has been selected for the first round of magnetized target experiments. Gas pipe targets are routinely shot on the NIF and provide unique value for external collaborators. High-level project goals have been established including an experimentallymore » relevant 20Tesla magnetic field magnitude. The field will be achieved using pulsed power-driven coils. A system architecture has been proposed. The pulsed power drive system will be located in the NIF target bay. This decision provides improved maintainability and mitigates equipment safety risks associated with explosive failure of the drive capacitor. High-level and first-level subsystem requirements have been established. Requirements have been included for two distinct coil designs – full solenoid and quasi-Helmholtz. A Failure Modes and Effects Analysis (FMEA) has been performed and documented. Additional requirements have been derived from the mitigations included in the FMEA document. A project plan is proposed. The plan includes a first phase of electromagnetic simulations to assess whether the design will meet performance requirements, then a second phase of risk mitigation projects to address the areas of highest technical risk. The duration from project kickoff to the first magnetized target shot is approximately 29 months.« less
NASA Astrophysics Data System (ADS)
Yuan, Manman; Wang, Weiping; Luo, Xiong; Li, Lixiang; Kurths, Jürgen; Wang, Xiao
2018-03-01
This paper is concerned with the exponential lag function projective synchronization of memristive multidirectional associative memory neural networks (MMAMNNs). First, we propose a new model of MMAMNNs with mixed time-varying delays. In the proposed approach, the mixed delays include time-varying discrete delays and distributed time delays. Second, we design two kinds of hybrid controllers. Traditional control methods lack the capability of reflecting variable synaptic weights. In this paper, the controllers are carefully designed to confirm the process of different types of synchronization in the MMAMNNs. Third, sufficient criteria guaranteeing the synchronization of system are derived based on the derive-response concept. Finally, the effectiveness of the proposed mechanism is validated with numerical experiments.
The Partnership: a History of the Apollo-Soyuz Test Project
NASA Technical Reports Server (NTRS)
Ezell, E. C.; Ezell, L. N.
1978-01-01
Correspondance, interviews, official documents, and other published materials were used to trace the evolution of the Apollo Soyuz Test Project from the initial proposal for international cooperation in space use and exploration until the successful completion of the joint Soviet-American mission. Conceptual drawings of proposed docking modules and mechanisms are presented and dicussed. Black and white photographs taken during mission planning and in-flight activities are included with color photographs of the earth taken during the mission. Joint meetings are summarized and the scientific experiments and launch vehicles are discussed in the appendices.
A Survey and Analysis of Frameworks and Framework Issues for Information Fusion Applications
NASA Astrophysics Data System (ADS)
Llinas, James
This paper was stimulated by the proposed project for the Santander Bank-sponsored "Chairs of Excellence" program in Spain, of which the author is a recipient. That project involves research on characterizing a robust, problem-domain-agnostic framework in which Information Fusion (IF) processes of all description, to include artificial intelligence processes and techniques could be developed. The paper describes the IF process and its requirements, a literature survey on IF frameworks, and a new proposed framework that will be implemented and evaluated at Universidad Carlos III de Madrid, Colmenarejo Campus.
Low-Temperature Enhanced Geothermal System using Carbon Dioxide as the Heat-Transfer Fluid
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eastman, Alan D.
2014-07-24
This report describes work toward a supercritical CO 2-based EGS system at the St. Johns Dome in Eastern Arizona, including a comprehensive literature search on CO 2-based geothermal technologies, background seismic study, geological information, and a study of the possible use of metal oxide heat carriers to enhance the heat capacity of sCO 2. It also includes cost estimates for the project, and the reasons why the project would probably not be cost effective at the proposed location.
BUILDING MATERIALS RECLAMATION PROGRAM
DOE Office of Scientific and Technical Information (OSTI.GOV)
David C. Weggel; Shen-En Chen; Helene Hilger
2010-08-31
This report describes work conducted on the Building Materials Reclamation Program for the period of September 2008 to August 2010. The goals of the project included selecting materials from the local construction and demolition (C&D) waste stream and developing economically viable reprocessing, reuse or recycling schemes to divert them from landfill storage. Educational resources as well as conceptual designs and engineering feasibility demonstrations were provided for various aspects of the work. The project was divided into two distinct phases: Research and Engineering Feasibility and Dissemination. In the Research Phase, a literature review was initiated and data collection commenced, an advisorymore » panel was organized, and research was conducted to evaluate high volume C&D materials for nontraditional use; five materials were selected for more detailed investigations. In the Engineering Feasibility and Dissemination Phase, a conceptual study for a regional (Mecklenburg and surrounding counties) collection and sorting facility was performed, an engineering feasibility project to demonstrate the viability of recycling or reuse schemes was created, the literature review was extended and completed, and pedagogical materials were developed. Over the two-year duration of the project, all of the tasks and subtasks outlined in the original project proposal have been completed. The Final Progress Report, which briefly describes actual project accomplishments versus the tasks/subtasks of the original project proposal, is included in Appendix A of this report. This report describes the scientific/technical aspects (hypotheses, research/testing, and findings) of six subprojects that investigated five common C&D materials. Table 1 summarizes the six subprojects, including the C&D material studied and the graduate student and the faculty advisor on each subproject.« less
2014-07-01
would meet the Project’s purpose and need. The Proposed Action hereinafter “Project” includes leasing land to and entering into a Power Purchase...Agreement (PPA) with a private developer who would design, construct, operate and maintain an unmanned photovoltaic (PV) solar energy facility at the...infrastructure (e.g., roads, power lines, water). The Project is projected to provide almost 25 percent of VAFB’s electrical energy and is not
Water Resources Research Grant Program project descriptions, fiscal year 1986
,
1986-01-01
Information is presented on the 43 projects funded by the United States Geological Survey 's Water Resources Grant Program in fiscal year 1986. The report gives the grant number; project title; performing organization; principal investigator(s); dates; and a project description which includes (1) identification of the water related problems and problem-solution approach, (2) contribution to problem solution, (3) objectives, (4) approach, and (5) result users. The 43 projects include 14 in the area of groundwater management, 6 in surface-water management, 2 in systems-operating/planning, 3 in irrigation management, 8 in desalination/reuse, 6 in economic/institutional studies, and 4 in climate variability. The reports contain tables showing (1) funding according to research topic, (2) projects funded to type of submitting organization, (3) proposals received, research topic, and funding levels, and (4) submitting organization. A comparison is given to fiscal year 1985 in each case. (USGS)
Brunetti, F; Garay, Á; Moreno, J C; Pons, J L
2011-01-01
This paper presents the development of a novel functional electrical stimulation (FES) system. New approaches in emerging rehabilitation robotics propose the use of residual muscular activity or limbs movements during the rehabilitation process of neuromotor. More ambitious projects propose the use of FES systems to restore or compensate motor capabilities by controlling existing muscles or subject limbs. These emerging approaches require more sophisticated FES devices in terms of channels, signals controls and portability. In the framework of HYPER project, such devices are being developed to support the main objective of the project: the development of neurorobots and neuroprosthetics to restore functional motor capabilities in patients who suffered cerebrovascular accidents or spinal cord injury. The presented portable FES system includes novel elec-trostimulator circuits and improved channel switching capacities to enable emerging approaches in rehabilitation robotics. © 2011 IEEE
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-04-01
The proposed Penelec project is one of 5 projects for potential funding under the fifth solicitation under the Clean Coal Technology program. In Penelec, two existing boilers would be replaced at Warren Station, PA; the new unit would produce 73 MW(e) in a combined cycle mode (using both gas-fired and steam turbines). The project would fill the need for a full utility-size demonstration of externally fire combined cycle (EFCC) technology as the next step toward commercialization. This environmental assessment was prepared for compliance with NEPA; its purpose is to provide sufficient basis for determining whether to prepare an environmental impactmore » statement or to issue a finding of no significant impact. It is divided into the sections: purpose and need for proposed action; alternatives; brief description of affected environment; environmental consequences, including discussion of commercial operation beyond the demonstration period.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-26
... awarded, up to a maximum of 5 points. Non-Federal contributions may include in-kind contributions such as... (including high-need LEAs), including superintendents, principals, and teachers; and (v) Non-profit... effects of the project on participant outcomes. Where feasible, applicants must propose an experimental or...
ERIC Educational Resources Information Center
Tindall, Lloyd W.; And Others
This handbook describes the processes and techniques used to develop, implement, and evaluate four integrated vocational and academic learning programs in Wisconsin that included students from special populations. The handbook contains seven chapters. Chapter 1 presents an overview of the project, including the request for proposal process and…
7 CFR 3405.7 - Joint project proposals.
Code of Federal Regulations, 2014 CFR
2014-01-01
... agricultural sciences. The goals of such joint initiatives should include maximizing the use of limited...), increasing cost-effectiveness through achieving economies of scale, strengthening the scope and quality of a...
7 CFR 3405.7 - Joint project proposals.
Code of Federal Regulations, 2013 CFR
2013-01-01
... agricultural sciences. The goals of such joint initiatives should include maximizing the use of limited...), increasing cost-effectiveness through achieving economies of scale, strengthening the scope and quality of a...
7 CFR 3405.7 - Joint project proposals.
Code of Federal Regulations, 2012 CFR
2012-01-01
... agricultural sciences. The goals of such joint initiatives should include maximizing the use of limited...), increasing cost-effectiveness through achieving economies of scale, strengthening the scope and quality of a...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-16
... business hours. SUPPLEMENTARY INFORMATION: Midway Gold US Inc. (Midway) proposes to construct and operate an open-pit gold mining operation, which would include open pits, a heap leach pad, waste rock dumps, and ancillary facilities. The mine would be located in the northern part of the Pancake Mountain Range...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-01
... summaries of proposed projects to be submitted to the Office of Management and Budget (OMB) for review and..., including the validity of the methodology and assumptions used; (3) Ways to enhance the quality, utility... on multidisciplinary care in cancer. A total of 21 hospitals participating in the NCCCP through June...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
...] Francis Proposed Low-Effect Habitat Conservation Plan for the Morro Shoulderband Snail, Los Osos, San Luis... conservation program to minimize and mitigate project activities as described in their low-effect habitat conservation plan. We invite comments from the public on the application, which includes the Francis Low-Effect...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-06
..., which requires agencies to coordinate and expedite the permitting and environmental review process for... by CRC to realign the federal channel to accommodate the proposed project. A ship simulation will be... provides information on how to participate in the process. The process includes an opportunity to submit...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-28
... by e-mail, use the following address: [email protected] . You must include the phrase ``proposed...-7527. If you use a telecommunications device for the deaf (TDD), call the Federal Relay Service (FRS), toll-free, at 1-800-877-8339. Individuals with disabilities can obtain this document in an accessible...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-17
.... Written comments and/or suggestions from the public and affected agencies are invited on one or more of... comments in writing, or request more information on the proposed project, contact Kevin P. Conway, Ph.D... or Email your request, including your address to: [email protected] . Formal requests...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-11
... proposed projects to be submitted to the Office of Management and Budget (OMB) for review and approval... Information Technology (CBIIT) launched the enterprise phase of the caBIG [supreg] initiative in early 2007... resources available through the caBIG [supreg] Enterprise Support Network (ESN), including the caBIG [supreg...
TU-F-18A-06: Dual Energy CT Using One Full Scan and a Second Scan with Very Few Projections
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wang, T; Zhu, L
Purpose: The conventional dual energy CT (DECT) requires two full CT scans at different energy levels, resulting in dose increase as well as imaging errors from patient motion between the two scans. To shorten the scan time of DECT and thus overcome these drawbacks, we propose a new DECT algorithm using one full scan and a second scan with very few projections by preserving structural information. Methods: We first reconstruct a CT image on the full scan using a standard filtered-backprojection (FBP) algorithm. We then use a compressed sensing (CS) based iterative algorithm on the second scan for reconstruction frommore » very few projections. The edges extracted from the first scan are used as weights in the Objectives: function of the CS-based reconstruction to substantially improve the image quality of CT reconstruction. The basis material images are then obtained by an iterative image-domain decomposition method and an electron density map is finally calculated. The proposed method is evaluated on phantoms. Results: On the Catphan 600 phantom, the CT reconstruction mean error using the proposed method on 20 and 5 projections are 4.76% and 5.02%, respectively. Compared with conventional iterative reconstruction, the proposed edge weighting preserves object structures and achieves a better spatial resolution. With basis materials of Iodine and Teflon, our method on 20 projections obtains similar quality of decomposed material images compared with FBP on a full scan and the mean error of electron density in the selected regions of interest is 0.29%. Conclusion: We propose an effective method for reducing projections and therefore scan time in DECT. We show that a full scan plus a 20-projection scan are sufficient to provide DECT images and electron density with similar quality compared with two full scans. Our future work includes more phantom studies to validate the performance of our method.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-26
... Dam. The project will consist of up to 335 wind turbine generators (WTGs). Construction may consist of... County Wind Farm Project, Mohave County, AZ AGENCY: Bureau of Land Management, Interior. ACTION: Notice....gov/az/st/en/prog/energy/wind/mohave.html . In order to be included in the Draft EIS, all comments...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-22
... greenhouse gas (GHG) and climate change considerations. Appendices to the SDEIS include copies of new reports... facilities at the border of the U.S. and Canada for the transport of crude oil across the U.S.-Canada... project (Keystone XL Project) that is designed to transport Canadian crude oil production from the Western...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-26
... proposed reservoirs from 6,225 feet to 7,330 feet; and (7) change the name of the project from ``Jones Canyon Pumped Storage Project'' to ``Oregon Winds Pumped Storage''. FERC Contact: Jennifer Harper, 202..., using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp . You must include your name...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-17
... Norfolk Airport Authority (NAA), the owner and operator of the airport. The additional planning effort by NAA has modified the project purpose and need and refined various project elements, including the need... decision to prepare a federal EIS primarily on NAA's proposal to construct a new Runway 5R/23L in parallel...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-08
...-FF08RSDC00] Otay River Estuary Restoration Project; South San Diego Bay Unit and Sweetwater Marsh Unit of the... scoping with regard to the environmental impact statement (EIS) for the proposed Otay River Estuary... one of the following methods. Email: [email protected] . Please include ``Otay Estuary NOI'' in the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-27
..., 2004. Following the release of the 2004 DEIS/EIR, the public comment period, and input from the cities... proposed project is located in Los Angeles and San Bernardino Counties encompassing six adjoining cities... west and Montclair on the east. The project area includes the cities of Glendora, San Dimas, La Verne...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
... proposed project would include 34 wind turbines, access roads, and a 34.5 kV energy collection line on 1... Tylerhorse Wind Project, Kern County, CA, and Possible Land Use Plan Amendment; CACA 51561 AGENCY: Bureau of...'s (Applicant or Power Partners) right-of-way (ROW) authorization request for the Tylerhorse Wind...
Genebanks: a comparison of eight proposed international genetic databases.
Austin, Melissa A; Harding, Sarah; McElroy, Courtney
2003-01-01
To identify and compare population-based genetic databases, or "genebanks", that have been proposed in eight international locations between 1998 and 2002. A genebank can be defined as a stored collection of genetic samples in the form of blood or tissue, that can be linked with medical and genealogical or lifestyle information from a specific population, gathered using a process of generalized consent. Genebanks were identified by searching Medline and internet search engines with key words such as "genetic database" and "biobank" and by reviewing literature on previously identified databases such as the deCode project. Collection of genebank characteristics was by an electronic and literature search, augmented by correspondence with informed individuals. The proposed genebanks are located in Iceland, the United Kingdom, Estonia, Latvia, Sweden, Singapore, the Kingdom of Tonga, and Quebec, Canada. Comparisons of the genebanks were based on the following criteria: genebank location and description of purpose, role of government, commercial involvement, consent and confidentiality procedures, opposition to the genebank, and current progress. All of the groups proposing the genebanks plan to search for susceptibility genes for complex diseases while attempting to improve public health and medical care in the region and, in some cases, stimulating the local economy through expansion of the biotechnology sector. While all of the identified plans share these purposes, they differ in many aspects, including funding, subject participation, and organization. The balance of government and commercial involvement in the development of each project varies. Genetic samples and health information will be collected from participants and coded in all of the genebanks, but consent procedures range from presumed consent of the entire eligible population to recruitment of volunteers with informed consent. Issues regarding confidentiality and consent have resulted in opposition to some of the more publicized projects. None of the proposed databases are currently operational and at least one project was terminated due to opposition. Ambitious genebank projects have been proposed in numerous countries and provinces. The characteristics of the projects vary, but all intend to map genes for common diseases and hope to improve the health of the populations involved. The impact of these projects on understanding genetic susceptibility to disease will be increasingly apparent if the projects become operational. The ethical, legal, and social implications of the projects should be carefully considered during their development. Copyright 2003 S. Karger AG, Basel
7 CFR 3405.7 - Joint project proposals.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 15 2011-01-01 2011-01-01 false Joint project proposals. 3405.7 Section 3405.7... AGRICULTURE HIGHER EDUCATION CHALLENGE GRANTS PROGRAM Program Description § 3405.7 Joint project proposals. Applicants are encouraged to submit joint project proposals as defined in § 3405.2(m), which address regional...
36 CFR 218.25 - Comments on proposed projects and activities.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Comments on a proposed project or activity to be documented in an environmental assessment shall be...) Comments on a proposed project or activity to be documented in an environmental impact statement shall be... proposed project or activity to be documented with an environmental assessment shall not be extended. (2...
36 CFR 218.25 - Comments on proposed projects and activities.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Comments on a proposed project or activity to be documented in an environmental assessment shall be...) Comments on a proposed project or activity to be documented in an environmental impact statement shall be... proposed project or activity to be documented with an environmental assessment shall not be extended. (2...
Idaho Habitat and Natural Production Monitoring Part I, 1993 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rich, Bruce A.; Petrosky, Charles E.
The Idaho Department of Fish and Game (IDFG) has been monitoring and evaluating proposed and existing habitat improvement projects for rainbow-steelhead trout Oncorhynchus mykiss and chinook salmon O. tshawytscha in the Clearwater River and Salmon River drainages on a large scale for the past 8 years. Projects included in the evaluation are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia rivers. A mitigation record is being developed using increased carrying capacity and/or survival as the best measures ofmore » benefit from a habitat enhancement project. Determination of full benefit from a project depends on completion or maturation of the project and presence of adequate numbers of fish to document actual increases in fish production. The depressed status of upriver anadromous stocks has precluded measuring full benefits of any habitat project in Idaho. Partial benefit is credited to the mitigation record in the interim period of run restoration.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Lonkhuyzen, R.; Stull, L.; Butler, J.
The National Institutes of Health (NIH) has proposed to partially fund the construction of the Howard T. Ricketts (HTR) regional biocontainment laboratory (RBL) by the University of Chicago at the U.S. Department of Energy's (DOE's) Argonne National Laboratory in Argonne, Illinois. The HTR Laboratory (HTRL) would be constructed, owned, and operated by the University of Chicago on land leased to it by DOE. The preferred project site is located north of Eastwood Drive and west of Outer Circle Road and is near the biological sciences building. This environmental assessment addresses the potential environmental effects resulting from construction and operation ofmore » the proposed facility. The proposed project involves the construction of a research facility with a footprint up to approximately 44,000 ft{sup 2} (4,088 m{sup 2}). The proposed building would house research laboratories, including Biosafety Level 2 and 3 biocontainment space, animal research facilities, administrative offices, and building support areas. The NIH has identified a need for new facilities to support research on potential bioterrorism agents and emerging and re-emerging infectious diseases, to protect the nation from such threats to public health. This research requires specialized laboratory facilities that are designed, managed, and operated to protect laboratory workers and the surrounding community from accidental exposure to agents. The proposed HTRL would provide needed biocontainment space to researchers and promote the advancement of knowledge in the disciplines of biodefense and emerging and re-emerging infectious diseases. Several alternatives were considered for the location of the proposed facility, as well as a no action alternative. The preferred alternative includes the construction of a research facility, up to 44,000 ft{sup 2} (4,088 m{sup 2}), at Argonne National Laboratory, a secure government location. Potential impacts to natural and cultural resources have been evaluated in this document. The proposed activities would result in the conversion of approximately 4 acres (2 ha) of old field and open woodland for the proposed facility and landscaped areas. Impacts of the proposed project on the following resources would be minor or negligible: human health, socioeconomics, air quality, noise levels, water quality, waste management, land use, the visual environment, cultural resources, soils, terrestrial biota, wetlands or aquatic biota, threatened and endangered species, transportation, utilities and services, and environmental justice. This environmental assessment has been completed to satisfy the requirements of the National Environmental Policy Act of 1969 and has been prepared in accordance with NIH guidelines and in coordination with federal, state, and local agency requirements. On the basis of the results of this assessment, impacts to environmental resources from the proposed project would be minor or negligible, provided that the project is implemented in accordance with the impact avoidance and mitigation measures described herein.« less
EEC focuses new energy budget on solar and conservation R and D
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-12-17
Solar energy, followed by conservation and geothermal energy, will have top priority for the European Economic Community's (ECC) $142 million energy research budget through 1983. Proposals for the cost-shared projects, of which EEC will pay half, are being accepted by eligible companies and research organizations. Committees for each technology advise the European Commission on which proposals to accept and suggest an appropriate funding level. The EEC also funds demonstrations of promising research to determine economic feasibility. Major emphasis will be placed during the present four-year budget for solar research on photovoltaics. Other projects include a European solar-insolation atlas and solar-heatingmore » manual, advanced batteries, and energy storage systems. Geothermal projects will focus on resource mapping, exploratory drilling, hydrogen production, and energy forecasting. (DCK)« less
Jacobi, James; Warshauer, F. R.; Price, Jonathan
2010-01-01
Non-zero baseline values are proposed for the one listed plant species found within the Lupea Project area, one species that is a candidate for listing, and the four other rare species we found that may be considered for listing in the future. Additionally, a zero baseline is proposed for 23 other species that were predicted, but not found within the project area. These include 14 Endangered species, one Threatened species, two candidates for listing, and six species of concern. Subsequent monitoring of the site will be necessary to determine if the populations of these species have increased or decreased relative to their baseline values. It is presumed that the management activities Kamehameha Schools has proposed for this area, particularly removal of the ungulates and weed control, will provide a benefit to the habitat as a whole and allow for natural regeneration and maintenance of the all elements of the plant communities found there.
A fully 3D approach for metal artifact reduction in computed tomography.
Kratz, Barbel; Weyers, Imke; Buzug, Thorsten M
2012-11-01
In computed tomography imaging metal objects in the region of interest introduce inconsistencies during data acquisition. Reconstructing these data leads to an image in spatial domain including star-shaped or stripe-like artifacts. In order to enhance the quality of the resulting image the influence of the metal objects can be reduced. Here, a metal artifact reduction (MAR) approach is proposed that is based on a recomputation of the inconsistent projection data using a fully three-dimensional Fourier-based interpolation. The success of the projection space restoration depends sensitively on a sensible continuation of neighboring structures into the recomputed area. Fortunately, structural information of the entire data is inherently included in the Fourier space of the data. This can be used for a reasonable recomputation of the inconsistent projection data. The key step of the proposed MAR strategy is the recomputation of the inconsistent projection data based on an interpolation using nonequispaced fast Fourier transforms (NFFT). The NFFT interpolation can be applied in arbitrary dimension. The approach overcomes the problem of adequate neighborhood definitions on irregular grids, since this is inherently given through the usage of higher dimensional Fourier transforms. Here, applications up to the third interpolation dimension are presented and validated. Furthermore, prior knowledge may be included by an appropriate damping of the transform during the interpolation step. This MAR method is applicable on each angular view of a detector row, on two-dimensional projection data as well as on three-dimensional projection data, e.g., a set of sequential acquisitions at different spatial positions, projection data of a spiral acquisition, or cone-beam projection data. Results of the novel MAR scheme based on one-, two-, and three-dimensional NFFT interpolations are presented. All results are compared in projection data space and spatial domain with the well-known one-dimensional linear interpolation strategy. In conclusion, it is recommended to include as much spatial information into the recomputation step as possible. This is realized by increasing the dimension of the NFFT. The resulting image quality can be enhanced considerably.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-12
...In compliance with the requirement of Section 3506(c)(2)(A) of the Paperwork Reduction Act of 1995, for opportunity for public comment on proposed data collection projects, National Cancer Institute (NCI), the National Institutes of Health (NIH) will publish periodic summaries of proposed projects to be submitted to the Office of Management and Budget (OMB) for review and approval. Written comments and/or suggestions from the public and affected agencies are invited to address one or more of the following points: (1) Whether the proposed collection of information is necessary for the proper performance of the function of the agency, including whether the information will have practical utility; (2) The accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (3) Ways to enhance quality, utility, and clarity of the information to be collected; and (4) Ways to minimize the burden of the collection of information on those who are to respond, including the use of appropriate automated, electronic, mechanical, or other technological collection techniques or other forms of information technology. To Submit Comments and for Further Information: To obtain a copy of the data collection plans and instruments, contact: Jessica Faupel- Badger, Ph.D., MPH, Cancer Prevention Fellowship Program, National Cancer Institute, 9609 Medical Center Drive, Room 2W136 MSC 9712, Bethesda, Maryland 20892-9712 or call non-toll-free number 240-276-5650 or Email your request, including your address to: [email protected] Formal requests for additional plans and instruments must be requested in writing.
ERIC Educational Resources Information Center
Atlanta Board of Education, GA.
A proposed project which is a result of the cooperative efforts of many agencies is described. The planned facility will offer to residents of the community, a multitude of needed services which have never been brought together under one roof. The center will include a middle school of grades six to eight for approximately 1,050 students. The…
Malheur River Wildlife Mitigation Project, Annual Report 2003.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ashley, Paul
Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affectmore » wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project proposals are subjected to a rigorous review process prior to receiving final approval. An eleven-member panel of scientists referred to as the Independent Scientific Review Panel (ISRP) examines project proposals. The ISRP recommends project approval based on scientific merit. The Bonneville Power Administration (BPA), the Columbia Basin Fish and Wildlife Authority (CBFWA), Council staff, the U.S. Fish and Wildlife Service (USFWS), the National Oceanic and Atmospheric Administration (NOAA), and subbasin groups also review project proposals to ensure each project meets regional and subbasin goals and objectives. The Program also includes a public involvement component that gives the public an opportunity to provide meaningful input on management proposals. After a thorough review, the Burns Paiute Tribe (BPT) acquired the Malheur River Mitigation Project (Project) with BPA funds to compensate, in part, for the loss of fish and wildlife resources in the Columbia and Snake River Basins and to address a portion of the mitigation goals identified in the Council's Program (NPPC 2000).« less
Carbon Nanotubules: Building Blocks for Nanometer-Scale Engineering
NASA Technical Reports Server (NTRS)
Sinnott, Susan B.
1999-01-01
The proposed work consisted of two projects: the investigation of fluid permeation and diffusion through ultrafiltration membranes composed of carbon nanotubules and the design and study of molecular transistors composed of nanotubules. The progress made on each project is summarized and also discussion about additional projects, one of which is a continuation of work supported by another grant, is included. The first project was Liquid Interactions within a Nanotubule Membrane. The second was the design of nanometer-scale hydrocarbon electronic devices. The third was the investigation of Mechanical properties of Nanotubules and Nanotubule bundles. The fourth project was to investigate the growth mechanisms of Carbon Nanotubules.
Code of Federal Regulations, 2014 CFR
2014-07-01
... a fee interest in real property on which a proposed project is planned to be located. Military... ensure that a project does not create an unacceptable risk to the national security of the United States. Proposed project. A proposed project is the project as described in the application submitted to the...
76 FR 29191 - Lawrence County Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-20
... project proposals and will be soliciting for additional projects. The purpose of the meeting is to review submitted projects and vote on project proposals to recommend for funding. DATES: The meeting will be held... be conducted: Review proposed projects. If Committee members have enough information, they may choose...
18 CFR 4.81 - Contents of application.
Code of Federal Regulations, 2010 CFR
2010-04-01
... and nature of any new roads that would be built for the purpose of conducting the studies; and (2... the proposed project, including floodplains and wetlands; measures that would be taken to minimize any...
7 CFR 1940.309 - Responsibilities of the prospective applicant.
Code of Federal Regulations, 2014 CFR
2014-01-01
... project elements and the proposed site(s) to include location maps, topographic maps, and photographs when... agency under Public Law 103-354 of a Soil Conservation Service (SCS) environmental assessment or...
78 FR 40827 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-08
... registration-required obligations in bearer form properly report interest and gain on disposition of the... information is necessary for the proper performance of the functions of the agency, including whether the...
78 FR 40831 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-08
... taxpayers and sourcing of income, deductions, gains and losses from a global dealing operation. The... information is necessary for the proper performance of the functions of the agency, including whether the...
Code of Federal Regulations, 2014 CFR
2014-01-01
... E of part 1944 of this chapter. This may include but is not limited to: 1. Schematic design drawings..., lot layouts, major drainageways, and other development planned. Preliminary sections and details shall... decisions regarding the conceptual design of the proposed project should be made prior to this submission...
ERIC Educational Resources Information Center
McArthur, Dana Lynn
2011-01-01
The completion of a formal proposal for a dissertation research project is a standard requirement as a prelude to the process of conducting research and writing a doctoral dissertation for students who complete a doctoral degree in most academic fields including all the branches of the field of education. Many students satisfactorily complete…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-20
... Park Project, a photovoltaic (PV) solar power plant with a planned generating capacity of up to 300...; AZA35927] Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Maricopa Solar... site at http://www.blm.gov/az/st/en/prog/energy/solar/maricopa-solar.html . In order to be included in...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-24
... mineral estate included in the proposed training land acquisition/airspace establishment project of the... message or question with the above individual. You will receive a reply during normal business hours... 14013 and lying northwesterly of the Old Woman Mountains Wilderness Area. T. 4 N., R. 16 E., Secs. 4 and...
Predictive control of a chaotic permanent magnet synchronous generator in a wind turbine system
NASA Astrophysics Data System (ADS)
Manal, Messadi; Adel, Mellit; Karim, Kemih; Malek, Ghanes
2015-01-01
This paper investigates how to address the chaos problem in a permanent magnet synchronous generator (PMSG) in a wind turbine system. Predictive control approach is proposed to suppress chaotic behavior and make operating stable; the advantage of this method is that it can only be applied to one state of the wind turbine system. The use of the genetic algorithms to estimate the optimal parameter values of the wind turbine leads to maximization of the power generation. Moreover, some simulation results are included to visualize the effectiveness and robustness of the proposed method. Project supported by the CMEP-TASSILI Project (Grant No. 14MDU920).
Code of Federal Regulations, 2010 CFR
2010-10-01
... proposed projects involving land, buildings, or other structures. 2102.10 Section 2102.10 Public Welfare... for proposed projects involving land, buildings, or other structures. (a) A party proposing a project... historical information about the building or other structure to be altered or razed; (ii) The identity of the...
Evolution of environmental impact assessment as applied to watershed modification projects in Canada
NASA Astrophysics Data System (ADS)
Dirschl, Herman J.; Novakowski, Nicholas S.; Sadar, M. Husain
1993-07-01
This article reviews the application of environmental impact assessment (EIA) procedures and practices to three watershed modification projects situaled in western Canada. These ventures were justified for accelerating regional economic development, and cover the period during which public concerns for protecting the environment rapidly made their way into the national political agenda. An historical account and analysis of the situation, therefore, seems desirable in order to understand the development of EIA processes, practices, and methodologies since the start of construction of the first project in 1961. This study concludes that there has been good progress in predicting and evaluating environmental and related social impacts of watershed modification proposals. However, a number of obstacles need to be overcome before EIA can firmly establish itself as an effective planning tool. These difficulties include jurisdictional confusions and conflicts, division of authority and responsibility in designing and implementing appropriate mitigative and monitoring measures, lack of tested EIA methodologies, and limited availability of qualified human resources. A number of conclusions and suggestions are offered so that future watershed modification proposals may be planned and implemented in a more environmentally sustainable fashion. These include: (1) EIA processes must be completed before irrevocable decisions are made. (2) Any major intrusion into a watershed is likely to impact on some major components of the ecosystem(s). (3) Mitigation costs must form part of the benefit-cost analysis of any project proposal. (4) Interjurisdictional cooperation is imperative where watersheds cross political boundaries. (5) The EIA process is a public process, hence public concerns must be dealt with fairly. (6) The role of science in the EIA process must be at arms length from project proponents and regulators, and allowed to function in the interest of the protection of the environment and public health and safety.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liu, Kunlei; Nikolic, Heather; Placido, Andrew
The goal of this final project report is to comprehensively summarize the work conducted on project DE-FE0026497. In accordance with the Statement of Project Objectives (SOPO), the University of Kentucky Center for Applied Energy Research (UKy-CAER) (Recipient) has developed an advanced, versatile, 10 MWe post-combustion CO 2 capture system (CCS) for a coal-fired power plant, Louisville Gas and Electric Company’s Trimble County Generating Station, using a heat integrated process combined with two-stage stripping and any advanced solvent to enhance the CO 2 absorber performance. The proposed project (Phase 1 and 2) will involve the design, fabrication, installation and testing ofmore » a large pilot scale facility that will demonstrate the UKy-CAER innovative carbon capture system integrated with an operating supercritical power plant. Specifically during Phase 1, the Recipient has provided all necessary documentation to support its Phase 2 down-selection including: the Project Narrative, the updated Project Management Plan (PMP), the preliminary engineering design, the Technical and Economic Analysis report (TEA) (including the Case 12 – Major Equipment List and submitted as a Topical Report), a Phase 1 Technology Gap Analysis (TGA), an Environmental Health and Safety (EH&S) Assessment on the 10 MWe unit, and updated Phase 2 cost estimates (including the detailed design, procurement, construction, operation, and decommissioning costs) with a budget justification. Furthermore, the Recipient has proposed a combined modular and freestanding column configuration with an advanced absorber gas/liquid distribution system, an advanced solvent, with the integration of discrete packing, a smart cross-over heat exchanger, and a load and ambient condition following control strategy, all to address ten of 12 technology gaps identified during the Phase I work. If successful, the proposed heat integrated post-combustion CCS will pave the way to achieve the United States Department of Energy National Energy Technology Laboratory (U.S. DOE NETL) CO 2 capture performance and cost target, as indicated in the submitted TEA and summarized in this report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jiang, Hanchen, E-mail: jhc13@mails.tsinghua.edu.cn; Qiang, Maoshan, E-mail: qiangms@tsinghua.edu.cn; Lin, Peng, E-mail: celinpe@mail.tsinghua.edu.cn
Public opinion becomes increasingly salient in the ex post evaluation stage of large infrastructure projects which have significant impacts to the environment and the society. However, traditional survey methods are inefficient in collection and assessment of the public opinion due to its large quantity and diversity. Recently, Social media platforms provide a rich data source for monitoring and assessing the public opinion on controversial infrastructure projects. This paper proposes an assessment framework to transform unstructured online public opinions on large infrastructure projects into sentimental and topical indicators for enhancing practices of ex post evaluation and public participation. The framework usesmore » web crawlers to collect online comments related to a large infrastructure project and employs two natural language processing technologies, including sentiment analysis and topic modeling, with spatio-temporal analysis, to transform these comments into indicators for assessing online public opinion on the project. Based on the framework, we investigate the online public opinion of the Three Gorges Project on China's largest microblogging site, namely, Weibo. Assessment results present spatial-temporal distributions of post intensity and sentiment polarity, reveals major topics with different sentiments and summarizes managerial implications, for ex post evaluation of the world's largest hydropower project. The proposed assessment framework is expected to be widely applied as a methodological strategy to assess public opinion in the ex post evaluation stage of large infrastructure projects. - Highlights: • We developed a framework to assess online public opinion on large infrastructure projects with environmental impacts. • Indicators were built to assess post intensity, sentiment polarity and major topics of the public opinion. • We took the Three Gorges Project (TGP) as an example to demonstrate the effectiveness proposed framework. • We revealed spatial-temporal patterns of post intensity and sentiment polarity on the TGP. • We drew implications for a more in-depth understanding of the public opinion on large infrastructure projects.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Erickson, Wallace P.
2002-12-01
Primarily due to concerns generated from observed raptor mortality at the Altamont Pass (CA) wind plant, one of the first commercial electricity generating wind plants in the U.S., new proposed wind projects both within and outside of California have received a great deal of scrutiny and environmental review. A large amount of baseline and operational monitoring data have been collected at proposed and existing U.S. wind plants. The primary use of the avian baseline data collected at wind developments has been to estimate the overall project impacts (e.g., very low, low, moderate, and high relative mortality) on birds, especially raptorsmore » and sensitive species (e.g., state and federally listed species). In a few cases, these data have also been used for guiding placement of turbines within a project boundary. This new information has strengthened our ability to accurately predict and mitigate impacts from new projects. This report should assist various stakeholders in the interpretation and use of this large information source in evaluating new projects. This report also suggests that the level of baseline data (e.g., avian use data) required to adequately assess expected impacts of some projects may be reduced. This report provides an evaluation of the ability to predict direct impacts on avian resources (primarily raptors and waterfowl/waterbirds) using less than an entire year of baseline avian use data (one season, two seasons, etc.). This evaluation is important because pre-construction wildlife surveys can be one of the most time-consuming aspects of permitting wind power projects. For baseline data, this study focuses primarily on standardized avian use data usually collected using point count survey methodology and raptor nest survey data. In addition to avian use and raptor nest survey data, other baseline data is usually collected at a proposed project to further quantify potential impacts. These surveys often include vegetation mapping and state or federal sensitive-status wildlife and plant surveys if there is a likelihood of these species occurring in the vicinity of the project area. This report does not address these types of surveys, however, it is assumed in this document that those surveys are conducted when appropriate to help further quantify potential impacts. The amount and extent of ecological baseline data to collect at a wind project should be determined on a case-by-case basis. The decision should use information gained from this report, recent information from new projects (e.g., Stateline OR/WA), existing project site data from agencies and other knowledgeable groups/individuals, public scoping, and results of vegetation and habitat mapping. Other factors that should also be considered include the likelihood of the presence of sensitive species at the site and expected impacts to those species, project size and project layout.« less
ERIC Educational Resources Information Center
Pierce, Elizabeth
2007-01-01
The proposal project stretches over a significant portion of the semester-long sophomore course Professional Communication (ENG 250) at Monroe Community College. While developing their proposal project, students need to use time management skills to successfully complete a quality project on time. In addition, excellent oral and written…
DNA algorithms of implementing biomolecular databases on a biological computer.
Chang, Weng-Long; Vasilakos, Athanasios V
2015-01-01
In this paper, DNA algorithms are proposed to perform eight operations of relational algebra (calculus), which include Cartesian product, union, set difference, selection, projection, intersection, join, and division, on biomolecular relational databases.
Getting Your Share of the Budget Pie.
ERIC Educational Resources Information Center
Alford, Cynthia; Kibbey, Marsha
1992-01-01
Presents guidelines for securing funding from the school administration for library automation projects, including suggestions on researching technology and writing a proposal. A sidebar offers advice on approaching corporations for funding for school library automation. (MES)
78 FR 69939 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-21
.... income taxation on gain of certain stock. Current Actions: There is no change to this existing regulation... information is necessary for the proper performance of the functions of the agency, including whether the...
76 FR 62500 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-07
...)(1) and 367(e)(2) provide for gain recognition on certain transfers to foreign persons under sections... information is necessary for the proper performance of the functions of the agency, including whether the...
78 FR 5461 - Proposed Information Collection Activity; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-25
... for Native Americans' (ANA) established Government Performance and Results Act (GPRA) measures, and (2... projects assisted through ANA grant dollars ``including evaluations that describe and measure the impact of... Colleges and Universities. [[Page 5462
34 CFR 606.22 - What are the selection criteria for development grants?
Code of Federal Regulations, 2011 CFR
2011-07-01
... achieved, will contribute to the growth and self-sufficiency of the institution; and (4) The plan clearly... practice and improvements developed under the proposed project, including, in particular, how operational...
34 CFR 606.22 - What are the selection criteria for development grants?
Code of Federal Regulations, 2013 CFR
2013-07-01
... achieved, will contribute to the growth and self-sufficiency of the institution; and (4) The plan clearly... practice and improvements developed under the proposed project, including, in particular, how operational...
Malheur River Wildlife Mitigation Project : 2008 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kesling, Jason; Abel, Chad; Schwabe, Laurence
2009-01-01
In 1998, the Burns Paiute Tribe (BPT) submitted a proposal to Bonneville Power Administration (BPA) for the acquisition of the Malheur River Wildlife Mitigation Project (Project). The proposed mitigation site was for the Denny Jones Ranch and included Bureau of Land Management (BLM) and Oregon Division of State Lands (DSL) leases and grazing allotments. The Project approval process and acquisition negotiations continued for several years until the BPT and BPA entered into a Memorandum of Agreement, which allowed for purchase of the Project in November 2000. The 31,781 acre Project is located seven miles east of Juntura, Oregon and ismore » adjacent to the Malheur River (Figure 1). Six thousand three hundred eighty-five acres are deeded to BPT, 4,154 acres are leased from DSL, and 21,242 acres are leased from BLM (Figure 2). In total 11 grazing allotments are leased between the two agencies. Deeded land stretches for seven miles along the Malheur River. It is the largest private landholding on the river between Riverside and Harper, Oregon. Approximately 938 acres of senior water rights are included with the Ranch. The Project is comprised of meadow, wetland, riparian and shrub-steppe habitats. The BLM grazing allotment, located south of the ranch, is largely shrub-steppe habitat punctuated by springs and seeps. Hunter Creek, a perennial stream, flows through both private and BLM lands. Similarly, the DSL grazing allotment, which lies north of the Ranch, is predominantly shrub/juniper steppe habitat with springs and seeps dispersed throughout the upper end of draws (Figure 2).« less
NASA Technical Reports Server (NTRS)
Phillips, Veronica J.
2017-01-01
The Ames Engineering Directorate is the principal engineering organization supporting aerospace systems and spaceflight projects at NASA's Ames Research Center in California's Silicon Valley. The Directorate supports all phases of engineering and project management for flight and mission projects-from R&D to Close-out-by leveraging the capabilities of multiple divisions and facilities.The Mission Design Center (MDC) has full end-to-end mission design capability with sophisticated analysis and simulation tools in a collaborative concurrent design environment. Services include concept maturity level (CML) maturation, spacecraft design and trades, scientific instruments selection, feasibility assessments, and proposal support and partnerships. The Engineering Systems Division provides robust project management support as well as systems engineering, mechanical and electrical analysis and design, technical authority and project integration support to a variety of programs and projects across NASA centers. The Applied Manufacturing Division turns abstract ideas into tangible hardware for aeronautics, spaceflight and science applications, specializing in fabrication methods and management of complex fabrication projects. The Engineering Evaluation Lab (EEL) provides full satellite or payload environmental testing services including vibration, temperature, humidity, immersion, pressure/altitude, vacuum, high G centrifuge, shock impact testing and the Flight Processing Center (FPC), which includes cleanrooms, bonded stores and flight preparation resources. The Multi-Mission Operations Center (MMOC) is composed of the facilities, networks, IT equipment, software and support services needed by flight projects to effectively and efficiently perform all mission functions, including planning, scheduling, command, telemetry processing and science analysis.
NASA Astrophysics Data System (ADS)
Sun, Jun-Wei; Shen, Yi; Zhang, Guo-Dong; Wang, Yan-Feng; Cui, Guang-Zhao
2013-04-01
According to the Lyapunov stability theorem, a new general hybrid projective complete dislocated synchronization scheme with non-derivative and derivative coupling based on parameter identification is proposed under the framework of drive-response systems. Every state variable of the response system equals the summation of the hybrid drive systems in the previous hybrid synchronization. However, every state variable of the drive system equals the summation of the hybrid response systems while evolving with time in our method. Complete synchronization, hybrid dislocated synchronization, projective synchronization, non-derivative and derivative coupling, and parameter identification are included as its special item. The Lorenz chaotic system, Rössler chaotic system, memristor chaotic oscillator system, and hyperchaotic Lü system are discussed to show the effectiveness of the proposed methods.
Rural migration in Nevada: Lincoln County. Phase 1, 1992--1993
DOE Office of Scientific and Technical Information (OSTI.GOV)
Soden, D.L.; Carns, D.E.; Mosser, D.
1993-12-31
The principal objective of this project was to develop insight into the scope of migration of working age Nevadans out of their county of birth; including the collection of data on their skill levels, desire to out or in-migrate, interactions between families of migratory persons, and the impact that the proposed high-level nuclear waste repository at Yucca mountain might have on their individual, and collective, decisions to migrate and return. The initial phase of this project reported here was conducted in 1992 and 1993 in Lincoln County, Nevada, one of the counties designated as ``affected`` by the proposed repository program.more » The findings suggest that a serious out-migration problem exists in Lincoln County, and that the Yucca mountain project will likely affect decisions relating to migration patterns in the future.« less
Three-dimensional volume containing multiple two-dimensional information patterns
NASA Astrophysics Data System (ADS)
Nakayama, Hirotaka; Shiraki, Atsushi; Hirayama, Ryuji; Masuda, Nobuyuki; Shimobaba, Tomoyoshi; Ito, Tomoyoshi
2013-06-01
We have developed an algorithm for recording multiple gradated two-dimensional projection patterns in a single three-dimensional object. When a single pattern is observed, information from the other patterns can be treated as background noise. The proposed algorithm has two important features: the number of patterns that can be recorded is theoretically infinite and no meaningful information can be seen outside of the projection directions. We confirmed the effectiveness of the proposed algorithm by performing numerical simulations of two laser crystals: an octagonal prism that contained four patterns in four projection directions and a dodecahedron that contained six patterns in six directions. We also fabricated and demonstrated an actual prototype laser crystal from a glass cube engraved by a laser beam. This algorithm has applications in various fields, including media art, digital signage, and encryption technology.
Application of expert systems in project management decision aiding
NASA Technical Reports Server (NTRS)
Harris, Regina; Shaffer, Steven; Stokes, James; Goldstein, David
1987-01-01
The feasibility of developing an expert systems-based project management decision aid to enhance the performance of NASA project managers was assessed. The research effort included extensive literature reviews in the areas of project management, project management decision aiding, expert systems technology, and human-computer interface engineering. Literature reviews were augmented by focused interviews with NASA managers. Time estimation for project scheduling was identified as the target activity for decision augmentation, and a design was developed for an Integrated NASA System for Intelligent Time Estimation (INSITE). The proposed INSITE design was judged feasible with a low level of risk. A partial proof-of-concept experiment was performed and was successful. Specific conclusions drawn from the research and analyses are included. The INSITE concept is potentially applicable in any management sphere, commercial or government, where time estimation is required for project scheduling. As project scheduling is a nearly universal management activity, the range of possibilities is considerable. The INSITE concept also holds potential for enhancing other management tasks, especially in areas such as cost estimation, where estimation-by-analogy is already a proven method.
75 FR 38770 - El Dorado County Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-06
... criteria for project proposals, and establish methods for soliciting project proposals. DATES: The meeting... norms and operating guidelines, learn about successful RACs, discuss criteria for project proposals and establish methods for soliciting proposals. More information will be posted on the Eldorado National Forest...
Global Development of Commercial Underground Coal Gasification
NASA Astrophysics Data System (ADS)
Blinderman, M. S.
2017-07-01
Global development of Underground Coal Gasification (UCG) is considered here in light of latest trends of energy markets and environmental regulations in the countries that have been traditional proponents of UCG. The latest period of UCG development triggered by initial success of the Chinchilla UCG project (1997-2006) has been characterized by preponderance of privately and share-market funded developments. The deceleration of UCG commercialization has been in part caused by recent significant decrease of world oil, gas and coal prices. Another substantial factor was lack of necessary regulations governing extraction and conversion of coal by UCG method in the jurisdictions where the UCG projects were proposed and developed. Along with these objective causes there seem to have been more subjective and technical reasons for a slowdown or cancelation of several significant UCG projects, including low efficiency, poor environmental performance, and inability to demonstrate technology at a sufficient scale and/or at a competitive cost. Latest proposals for UCG projects are briefly reviewed.
49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.
Code of Federal Regulations, 2013 CFR
2013-10-01
... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...
49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.
Code of Federal Regulations, 2014 CFR
2014-10-01
... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...
49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.
Code of Federal Regulations, 2012 CFR
2012-10-01
... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...
43 CFR 404.50 - What information will be included in the feasibility report prepared by Reclamation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PROGRAM Feasibility Studies § 404.50 What information will be included in the feasibility report prepared... determination; (b) A recommendation to Congress regarding whether or not the proposed rural water supply project should be authorized for construction, and the reasons supporting the recommendation. This recommendation...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-04
... Programmatic Agreement for Managing Properties Included in or Eligible for Inclusion in the National Register... Programmatic Agreement for managing properties included in, or eligible for inclusion in, the National Register... the official service list for the above-captioned proceedings may request inclusion on the restricted...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-08
... List for a Programmatic Agreement for Managing Properties Included in or Eligible for Inclusion in the... agreement for managing properties included in, or eligible for inclusion in, the National Register of... official service list for the above-captioned proceeding may request inclusion on the restricted service...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-28
... Service List for a Programmatic Agreement for Managing Properties Included In or Eligible for Inclusion In... agreement for managing properties included in, or eligible for inclusion in, the National Register of... request inclusion on the restricted service list, or may request that a restricted service list not be...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-29
... List for a Programmatic Agreement for Managing Properties Included in or Eligible for Inclusion in the... a programmatic agreement for managing properties included in, or eligible for inclusion in, the... official service list for the above-captioned proceeding may request inclusion on the restricted service...
49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...
49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.
Code of Federal Regulations, 2011 CFR
2011-10-01
... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...
50 CFR 84.12 - What are the information collection, record keeping, and reporting requirements?
Code of Federal Regulations, 2012 CFR
2012-10-01
... effects on threatened and endangered species. (6) A grant agreement form if the proposal is selected for..., threatened and endangered species, and migratory birds) have benefited? (c) Reporting requirements include... habitat (list habitat types and include the acreage of each). Are the results of the project being...
50 CFR 84.12 - What are the information collection, record keeping, and reporting requirements?
Code of Federal Regulations, 2014 CFR
2014-10-01
... effects on threatened and endangered species. (6) A grant agreement form if the proposal is selected for..., threatened and endangered species, and migratory birds) have benefited? (c) Reporting requirements include... habitat (list habitat types and include the acreage of each). Are the results of the project being...
50 CFR 84.12 - What are the information collection, record keeping, and reporting requirements?
Code of Federal Regulations, 2013 CFR
2013-10-01
... effects on threatened and endangered species. (6) A grant agreement form if the proposal is selected for..., threatened and endangered species, and migratory birds) have benefited? (c) Reporting requirements include... habitat (list habitat types and include the acreage of each). Are the results of the project being...
50 CFR 84.12 - What are the information collection, record keeping, and reporting requirements?
Code of Federal Regulations, 2011 CFR
2011-10-01
... effects on threatened and endangered species. (6) A grant agreement form if the proposal is selected for..., threatened and endangered species, and migratory birds) have benefited? (c) Reporting requirements include... habitat (list habitat types and include the acreage of each). Are the results of the project being...
Air Reserve Component: Key to the Air Force’s Future
2013-03-01
REPORT TYPE STRATEGY RESEARCH PROJECT .33 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Air Reserve Component: Key to the Air Force’s...b. ABSTRACT UU c. THIS PAGE UU 19b. TELEPHONE NUMBER (Include area code) USAWC STRATEGY RESEARCH PROJECT...RAND Corporation, Prepared for the Office of Secretary of Defense, 2008), XV. 64 T.X. Hammes, "Offshore Control: A Proposed Strategy ," Infinity
ERIC Educational Resources Information Center
Illinois State Dept. of Public Aid, Springfield.
This booklet provides a description of 14 projects which were awarded funds during fiscal year 1987 for collaborative research in long-term care to find new ways to treat long-term care patients in Illinois nursing homes. It includes the organization or institution receiving the award, an abstract of the research proposal, and the name of the…
77 FR 19016 - Proposed Data Collections Submitted for Public Comment and Recommendations
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-29
... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or... the use of automated collection techniques or other forms of information technology. Written comments...
77 FR 10750 - Proposed Data Collections Submitted for Public Comment and Recommendations
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-23
... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or... through the use of automated collection techniques or other forms of information technology. Written...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-29
... wild horse and burro management and wind energy development proposals. Agenda items for the joint... for the Northwest California RAC include the Walker Ridge wind energy project, wilderness management...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-11
... disturbances such as high-severity wildfire, climate change, or insects. Proposed actions include improving... considered. The no-action alternative represents no change and serves as the baseline for the comparison...
75 FR 28328 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-20
... of gain on a partnership's sale of qualified small business stock and deferral of gain on a partner's... information is necessary for the proper performance of the functions of the agency, including whether the...
78 FR 13401 - Proposed Collection; Comment Request For Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-27
... must generally file a gain recognition agreement with the IRS in order to defer gain on a Code section... for the proper performance of the functions of the agency, including whether the information shall...
RH-LLW Disposal Facility Project CD-2/3 to Design/Build Proposal Reconciliation Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Annette L. Schafer
2012-06-01
A reconciliation plan was developed and implemented to address potential gaps and responses to gaps between the design/build vendor proposals and the Critical Decision-2/3 approval request package for the Remote-Handled Low Level Waste Disposal Facility Project. The plan and results of the plan implementation included development of a reconciliation team comprised of subject matter experts from Battelle Energy Alliance and the Department of Energy Idaho Operations Office, identification of reconciliation questions, reconciliation by the team, identification of unresolved/remaining issues, and identification of follow-up actions and subsequent approvals of responses. The plan addressed the potential for gaps to exist in themore » following areas: • Department of Energy Order 435.1, “Radioactive Waste Management,” requirements, including the performance assessment, composite analysis, monitoring plan, performance assessment/composite analysis maintenance plan, and closure plan • Environmental assessment supporting the National Environmental Policy Act • Nuclear safety • Safeguards and security • Emplacement operations • Requirements for commissioning • General project implementation. The reconciliation plan and results of the plan implementation are provided in a business-sensitive project file. This report provides the reconciliation plan and non-business sensitive summary responses to identified gaps.« less
Geodiversity and geoheritage research and education in Mexico
NASA Astrophysics Data System (ADS)
Palacio, J. L.
2012-04-01
Geosites, geomorphosites, geoheritage, geodiversity and other related research and educational fields have been absent in the curricula of Mexican universities, although some efforts to consider those topics started in 2004 (Garrido, 2004). In the case of Mexico, Geographers have been the main promoters of the study of geoparks and, more recently, geomorphosites; studies on geosites have been developed by geologists although, in all cases, concrete examples are very limited in number since no systematic work has been proposed. A general educational project to promote the study and research on Geoparks (including Geodiversity, Geoconservation, Geosites and Geomorphosites) has been recently proposed atthye Universidad Nacional Autónoma de México. The main components of this project include: a) Teaching. Starting only this year, the School of Geography (undergraduate level) incorporated for the first time a subject specifically related to geoparks, geosites and geomorphosites. The subject is complemented with other, more specifically related to the land use management, cartography and (geo)tourism; b) Research. At the Institute of Geography, projects to conduct systematic research on geoparks and related items has just started; c) Natural heritage promotion and Geotourism. In a national context, where tourism has received official attention and extraordinary financial support, Geotourism plays an important part of the educational project. A proposal has been submitted to the Ministry of Tourism so that students are expected to get an official certificate to carry out activities related to the promotion of the natural heritage as a (Geo)tourist Guide. Among general goals, the creation of regional and national networks of geoparks, and participation in international efforts (geosites and geomorphosites lists), are also considered.
78 FR 49758 - Proposed Data Collections Submitted for Public Comment and Recommendations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-15
... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or... collection techniques or other forms of information technology. Written comments should be received within 60...
77 FR 58394 - Proposed Data Collections Submitted for Public Comment and Recommendations
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or... collection techniques or other forms of information technology. Written comments should be received within 60...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gilman, J
2005-03-15
To prepare for this project, EPRI and BWRVIP conducted a workshop at Ponte Vedra Beach, Florida during February 19-21, 2003 (EPRI report 1007822). Attendees were invited to exchange relevant information on the effects of irradiation on austenitic materials in light water reactors and to produce recommendations for further work. EPRI reviewed the data, recommendations, and conclusions derived from the workshop and developed prioritized test matrices defining new data needs. Proposals were solicited, and selected proposals are the basis for the program described in this report. Results The planned test matrix for fracture toughness testing includes 21 tests on 5 materials.
NASA Astrophysics Data System (ADS)
Favata', P.; Martineau, N.
2002-01-01
creating a revolutionary space-orbiting habitat dedicated to tourism. Up to now, such proposals have focused on two approaches. The first accounts for financial and technological constraints on space flight and living, and sacrifices creativity for practicality. The second is more utopic in nature and proposes projects, which are imaginative but unfeasible in the near future. This proposal is innovative because it considers the current obstacles to space tourism and utilizes existing technologies and infrastructures, but also includes the forethinking of futuristic commercial projects. Project Objectives: NASA claims that commercialization of space activities is so difficult that it will require decades more funding of so-called space-technology development. The benefits of this project show that this is not true. First, safety has been addressed because this proposal utilizes already space tested and assured technologies. Second, the project demonstrates potential for significant economic profit within the near future. Because we are using the least expensive technology available, we have limited start up costs. We forecast up to forty flights per year, with a potential capacity of eighty tourists. The design objectives focus on the proposal of a new approach to space tourism. These include: the expansion of the living space in the interiors, innovative and creative interior design, increased concern for the physiological and psychological comfort of tourists, and attention to entertainment possibilities. Project Content: The efficiency of the launch and configuration phase is one of the strengths of the proposed project. We propose the use of the Zenith 2 launcher, a large two-stage vehicle developed in the Soviet Union in the early 1980s, for the configuration of the orbiting platform. Following the Russian outfitting philosophy, once in orbit, the platform is already functional. The interior design is based on advanced lightweight inflatable technologies which are characterized by high packing density performance, and which decrease the mass of the module and the manufacturing costs. This reduces the overall cost, time and complexity of the configuration phase. for up to two weeks. They will be transported by two Soyuz flights. Supplies and fuel will be delivered by the Progress vehicle. The lowering of the module mass will allow extra storage volume and therefore the reduction of one logistic flight per month. production capacity. By stimulating a market use for the Soyuz and Progress, our project will increase production demand, thus, exponentially decreasing production costs over time. This private-public venture will offer Russia both significant employment opportunities as well as the investment of capital. project includes significant technological and design modifications. It utilizes traditional rigid structure but revolutionizes the interiors. In terms of engineering, the present homogeneous distribution of subsystems is replaced by a concentrated model. At the same time, we assure the facilitation of maintenance and eventual substitution of parts, through the use of mobile, modular components. Architecturally, the project is focused on the physiological and psychological needs of tourists, with particular attention paid to: circadian rhythms, and therefore, illumination, the variety of compatible materials and shapes, and noise and vibration reduction. Interchangeable and mobile furniture creates multi-functional areas, with innovative colors and details. This also guarantees the enlargement of the habitable volume in order to provide innovative tourist activities. Contributions: As stated earlier, this project, which is the result of collaboration between an engineer and an architect, reconciles the realities of current space exploration with new ideas for opening space tourism in the near future, responding to an emerging market. The project suggests a new way to utilize current technologies for commercial purposes. This facilitates cooperation between space agencies and business sectors. Such an approach benefits the private sector by decreasing the time horizon for feasible space tourism. In addition to the use of existing state technology, such collaboration may help overcome the legal and policy obstacles to space tourism presented by most western space agencies. Finally, the project promotes international cooperation between the private companies of advanced industrial states, and Russia. Also, because the module can be utilized for other commercial purposes, in addition to space tourism (i.e. broadcasting, advertisement, etc.) revenues will be gained in other activities. Even though the initial costs of space tourism are high, investment returns can be measured in many ways. Throughout Eastern Europe, companies such as Coca-Cola and Volkswagen are currently investing despite diminished initial returns because they want to open new markets, which will be profitable in the long run and build their image worldwide. This project, which does foresee profitable returns, follows a similar strategy by starting in Russia.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-26
... Proposed Wheatgrass Ridge Wind Project, Fort Hall Indian Reservation, Idaho AGENCY: Bureau of Indian... proposed Wheatgrass Ridge Wind Project on the Fort Hall Indian Reservation, Idaho. FOR FURTHER INFORMATION... INFORMATION: The BIA is canceling work on this EIS because the proponent of the Wheatgrass Ridge Wind Project...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-12
... proposed Mount Hope Molybdenum Mining Project. The proposed project would be located in central Nevada... project proposal is to extract molybdenite from public lands where EML holds mining claims and private... that is environmentally responsible and in compliance with Federal mining laws, the Federal Land Policy...
Project Scoping Guidebook for Metropolitan Planning Organization Transportation Projects
DOT National Transportation Integrated Search
2017-08-01
To obtain state and federal funding for proposed transportation projects in metropolitan areas, local governments submit project proposals to their Metropolitan Planning Organization (MPO) during the early stages of project planning. The purpose of t...
77 FR 5258 - Proposed Information Collection Activity; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-02
... Information Collection Activity; Comment Request Proposed Projects Title: Child Welfare Demonstration Projects... agencies to submit proposals for new child welfare waiver demonstration projects. CB is able to approve up to ten child welfare [[Page 5259
Design of a low-cost, compact SRF accelerator for flue gas and wastewater treatment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ciovati, Gianluigi
2016-04-01
Funding is being requested pursuant to a proposal that was submitted and reviewed through the Portfolio Analysis and Management System (PAMS). PAMS Proposal ID: 222439. The proposed project consists of the design of a novel superconducting continuous-wave accelerator capable of providing a beam current of ~1 A at an energy of 1-2 MeV for the treatment of flue gases and wastewater streams. The novel approach consists on studying the feasibility of using a single-cell Nb cavity coated with a thin Nb3Sn layer of the inner surface and conductively cooled by to 4.2 K by cryocoolers inside a compact cryomodule. Themore » proposed study will include beam transport simulations, thermal and mechanical engineering analysis of the cryomodule and a cost analysis for both the fabrications costs and the operational and maintenance costs of such accelerator. The outcome of the project will be a report summarizing the analysis and results from the design study.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-20
... specific projects must demonstrate high artistic ability, excellent interpersonal skills, and be conversant... progress towards outcomes or the results achieved. Examples of outputs include the number of people trained...
Magnetometer instrument team studies for the definition phase of the outer planets grand tour
NASA Technical Reports Server (NTRS)
Coleman, P. J., Jr.
1972-01-01
The objectives of magnetic field investigations on missions to the outer planets were defined as well as an instrumentation system, a program of studies and instrument development tasks was proposed for the mission definition phase of the Outer Planets Grand Tour project. A report on the status of this program is given. Requirements were also established for the spacecraft and the mission which would insure their compatibility with the magnetic field investigation proposed for the outer planets missions and developed figures of merit for encounter trajectories. The spacecraft-instrumentation interface and the on-board data handling system were defined in various reports by the Project Team and in the reports by the Science Steering Group. The defining program for exploring the outer planets within the more restrictive constraints of the Mariner Jupiter-Saturn project included defining a limited magnetic field investigation.
Development of a model for predicting NASA/MSFC program success
NASA Technical Reports Server (NTRS)
Riggs, Jeffrey; Miller, Tracy; Finley, Rosemary
1990-01-01
Research conducted during the execution of a previous contract (NAS8-36955/0039) firmly established the feasibility of developing a tool to aid decision makers in predicting the potential success of proposed projects. The final report from that investigation contains an outline of the method to be applied in developing this Project Success Predictor Model. As a follow-on to the previous study, this report describes in detail the development of this model and includes full explanation of the data-gathering techniques used to poll expert opinion. The report includes the presentation of the model code itself.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-25
...), determined that the proposed project may result in significant impacts to the environment, and that the preparation of an Environmental Impact Statement (EIS) is required. The Applicant proposes to implement a... Environmental Impact Statement for the Proposed Westbrook Project, Corps Permit Application Number SPK-2005...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-09
... assistance from RUS for the construction of the proposed Project. RUS is considering funding the proposed... effect of the proposed Project on historic properties; i.e., buildings, structures, sites, objects and... responsibilities to take into account effects to historic properties. RUS has determined that the proposed project...
42 CFR 52h.10 - What matters must be reviewed for solicited contract proposals?
Code of Federal Regulations, 2010 CFR
2010-10-01
... with respect to a contract project involving solicited contract proposals, unless the project concept... group has made recommendations concerning the scientific merit of the concept. (b) The awarding official... review of the project concept and the proposals has been completed. The request for proposals shall state...
75 FR 39535 - Agency Information Collection Activities: Proposed Collection: Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-09
... opportunity for public comment on proposed data collection projects (section 3506(c)(2)(A) of Title 44, United... more information on the proposed project or to obtain a copy of the data collection plans and draft... forms of information technology. Proposed Project: Bureau of Primary Health Care (BPHC) Uniform Data...
Managing the Perception of Advanced Technology Risks in Mission Proposals
NASA Technical Reports Server (NTRS)
Bellisario, Sebastian Nickolai
2012-01-01
Through my work in the project proposal office I became interested in how technology advancement efforts affect competitive mission proposals. Technology development allows for new instruments and functionality. However, including technology advancement in a mission proposal often increases perceived risk. Risk mitigation has a major impact on the overall evaluation of the proposal and whether the mission is selected. In order to evaluate the different approaches proposals took I compared the proposals claims of heritage and technology advancement to the sponsor feedback provided in the NASA debriefs. I examined a set of Discovery 2010 Mission proposals to draw patterns in how they were evaluated and come up with a set of recommendations for future mission proposals in how they should approach technology advancement to reduce the perceived risk.
The NSF IUSE-EHR Program: What's New (and Old) About It, and Resources for Geoscience Proposers
NASA Astrophysics Data System (ADS)
Singer, J.; Ryan, J. G.
2015-12-01
The NSF Division of Undergraduate Education recently released a new solicitation for the IUSE program -- the latest iteration in a succession of funding programs dating back over 30 years (including the Instrumentation and Laboratory Improvement Program (ILI), the Course and Curriculum Development Program (CCD), the Course Curriculum and Laboratory Improvement Program (CCLI), and the Transforming Undergraduate STEM Education Program (TUES). All of these programs sought/seek to support high quality STEM education for majors and non-majors in lower- and upper-division undergraduate courses. The current IUSE-EHR program is described in a 2-year solicitation that includes two tracks: Engaged Student Learning, and Institutional & Community Transformation. Each track has several options for funding level and project duration. A wide range of activities can be proposed for funding, and the program recognizes the varying needs across STEM disciplines. Geoscientists and other potential IUSE proposers are strongly encouraged to form collaborations with colleagues that conduct educational research and to propose projects that build upon the educational knowledge base in the discipline as well as contribute to it. Achieving this may not be immediately obvious to many geoscientists who have interests in improving student learning in their courses, but are not fluent in the scholarship of education in their field. To lower the barriers that have historically prevented larger numbers of geoscientists from developing their ideas into competitive education-related proposals, we have explored strategies for building and leveraging partnerships, sought to identify available resources for proposers, and explored a range of strategies for engaging and supporting larger numbers of potential geoscience proposers.
Test Program for Stirling Radioisotope Generator Hardware at NASA Glenn Research Center
NASA Technical Reports Server (NTRS)
Lewandowski, Edward J.; Bolotin, Gary S.; Oriti, Salvatore M.
2015-01-01
Stirling-based energy conversion technology has demonstrated the potential of high efficiency and low mass power systems for future space missions. This capability is beneficial, if not essential, to making certain deep space missions possible. Significant progress was made developing the Advanced Stirling Radioisotope Generator (ASRG), a 140-W radioisotope power system. A variety of flight-like hardware, including Stirling convertors, controllers, and housings, was designed and built under the ASRG flight development project. To support future Stirling-based power system development NASA has proposals that, if funded, will allow this hardware to go on test at the NASA Glenn Research Center. While future flight hardware may not be identical to the hardware developed under the ASRG flight development project, many components will likely be similar, and system architectures may have heritage to ASRG. Thus, the importance of testing the ASRG hardware to the development of future Stirling-based power systems cannot be understated. This proposed testing will include performance testing, extended operation to establish an extensive reliability database, and characterization testing to quantify subsystem and system performance and better understand system interfaces. This paper details this proposed test program for Stirling radioisotope generator hardware at NASA Glenn. It explains the rationale behind the proposed tests and how these tests will meet the stated objectives.
Test Program for Stirling Radioisotope Generator Hardware at NASA Glenn Research Center
NASA Technical Reports Server (NTRS)
Lewandowski, Edward J.; Bolotin, Gary S.; Oriti, Salvatore M.
2014-01-01
Stirling-based energy conversion technology has demonstrated the potential of high efficiency and low mass power systems for future space missions. This capability is beneficial, if not essential, to making certain deep space missions possible. Significant progress was made developing the Advanced Stirling Radioisotope Generator (ASRG), a 140-watt radioisotope power system. A variety of flight-like hardware, including Stirling convertors, controllers, and housings, was designed and built under the ASRG flight development project. To support future Stirling-based power system development NASA has proposals that, if funded, will allow this hardware to go on test at the NASA Glenn Research Center (GRC). While future flight hardware may not be identical to the hardware developed under the ASRG flight development project, many components will likely be similar, and system architectures may have heritage to ASRG. Thus the importance of testing the ASRG hardware to the development of future Stirling-based power systems cannot be understated. This proposed testing will include performance testing, extended operation to establish an extensive reliability database, and characterization testing to quantify subsystem and system performance and better understand system interfaces. This paper details this proposed test program for Stirling radioisotope generator hardware at NASA GRC. It explains the rationale behind the proposed tests and how these tests will meet the stated objectives.
The IASLC Lung Cancer Staging Project: data elements for the prospective project.
Giroux, Dorothy J; Rami-Porta, Ramón; Chansky, Kari; Crowley, John J; Groome, Patti A; Postmus, Pieter E; Rusch, Valerie; Sculier, Jean-Paul; Shepherd, Frances A; Sobin, Leslie; Goldstraw, Peter
2009-06-01
The International Association for the Study of Lung Cancer Retrospective Staging Project culminated in a series of recommendations to the International Union Against Cancer and to the American Joint Committee on Cancer regarding the seventh edition of the tumor, node, metastasis (TNM) classification for lung cancer. The International Staging Committee of the International Association for the Study of Lung Cancer now issues this call for participation in the Prospective Project designed to assess the validity of each component of T, N, and M, and other factors relevant to lung cancer staging and prognosis. In the Retrospective Project, the original data acquisition was typically motivated by interests other than staging. In contrast, the Prospective Project offers online data entry. Alternatively, participants may transfer existing data, provided core objectives are addressed. Cancer Research and Biostatistics will coordinate data management and analysis. The study population is newly diagnosed lung cancer patients. Data elements include patient characteristics, baseline laboratory values, first-line treatment, TNM plus supporting evidence, and survival. Pretreatment TNM will be collected for all cases; postsurgical TNM, if resection is attempted. T descriptors include size and degree of tumor extension, with further description of extent of visceral pleural invasion, venous invasion, carcinomatous lymphangitis, and pleural lavage cytology. M descriptors characterize the newly proposed M1a category and sites of distant metastases. Nodal station involvement is described by means of a newly proposed nodal map, facilitating international participation, and allowing further investigation of nodal zones. Successful collection and analysis of these data can be expected to yield unprecedented improvements in the utility and validity of lung cancer staging.
The Arctic Human Health Initiative: a legacy of the International Polar Year 2007–2009
Parkinson, Alan J.
2013-01-01
Background The International Polar Year (IPY) 2007–2008 represented a unique opportunity to further stimulate cooperation and coordination on Arctic health research and increase the awareness and visibility of Arctic regions. The Arctic Human Health Initiative (AHHI) was a US-led Arctic Council IPY coordinating project that aimed to build and expand on existing International Union for Circumpolar Health (IUCH) and Arctic Council human health interests. The project aimed to link researchers with potential international collaborators and to serve as a focal point for human health research, education, outreach and communication activities during the IPY. The progress of projects conducted as part of this initiative up until the end of the Arctic Council Swedish chairmanship in May 2013 is summarized in this report. Design The overall goals of the AHHI was to increase awareness and visibility of human health concerns of Arctic peoples, foster human health research, and promote health strategies that will improve health and well-being of all Arctic residents. Proposed activities to be recognized through the initiative included: expanding research networks that will enhance surveillance and monitoring of health issues of concern to Arctic peoples, and increase collaboration and coordination of human health research; fostering research that will examine the health impact of anthropogenic pollution, rapid modernization and economic development, climate variability, infectious and chronic diseases, intentional and unintentional injuries, promoting education, outreach and communication that will focus public and political attention on Arctic health issues, using a variety of publications, printed and electronic reports from scientific conferences, symposia and workshops targeting researchers, students, communities and policy makers; promoting the translation of research into health policy and community action including implementation of prevention strategies and health promotion; and promoting synergy and strategic direction of Arctic human health research and health promotion. Results As of 31 March, 2009, the official end of the IPY, AHHI represented a total of 38 proposals, including 21 individual Expressions of Intent (EoI), and 9 full proposals (FP), submitted to the IPY Joint Committee for review and approval from lead investigators from the US, Canada, Greenland, Norway, Finland, Sweden and the Russian Federation. In addition, there were 10 National Initiatives (NI-projects undertaken during IPY beyond the IPY Joint Committee review process). Individual project details can be viewed at www.arctichealth.org. The AHHI currently monitors the progress of 28 individual active human health projects in the following thematic areas: health network expansion (5 projects), infectious disease research (7 projects), environmental health research (7 projects), behavioral and mental health research (4 projects), and outreach education and communication (5 projects). Conclusions While some projects have been completed, others will continue well beyond the IPY. The IPY 2007–2008 represented a unique opportunity to further stimulate cooperation and coordination on Arctic health research and increase the awareness and visibility of Arctic regions. PMID:23971017
The Arctic Human Health Initiative: a legacy of the International Polar Year 2007-2009.
Parkinson, Alan J
2013-01-01
The International Polar Year (IPY) 2007-2008 represented a unique opportunity to further stimulate cooperation and coordination on Arctic health research and increase the awareness and visibility of Arctic regions. The Arctic Human Health Initiative (AHHI) was a US-led Arctic Council IPY coordinating project that aimed to build and expand on existing International Union for Circumpolar Health (IUCH) and Arctic Council human health interests. The project aimed to link researchers with potential international collaborators and to serve as a focal point for human health research, education, outreach and communication activities during the IPY. The progress of projects conducted as part of this initiative up until the end of the Arctic Council Swedish chairmanship in May 2013 is summarized in this report. The overall goals of the AHHI was to increase awareness and visibility of human health concerns of Arctic peoples, foster human health research, and promote health strategies that will improve health and well-being of all Arctic residents. Proposed activities to be recognized through the initiative included: expanding research networks that will enhance surveillance and monitoring of health issues of concern to Arctic peoples, and increase collaboration and coordination of human health research; fostering research that will examine the health impact of anthropogenic pollution, rapid modernization and economic development, climate variability, infectious and chronic diseases, intentional and unintentional injuries, promoting education, outreach and communication that will focus public and political attention on Arctic health issues, using a variety of publications, printed and electronic reports from scientific conferences, symposia and workshops targeting researchers, students, communities and policy makers; promoting the translation of research into health policy and community action including implementation of prevention strategies and health promotion; and promoting synergy and strategic direction of Arctic human health research and health promotion. As of 31 March, 2009, the official end of the IPY, AHHI represented a total of 38 proposals, including 21 individual Expressions of Intent (EoI), and 9 full proposals (FP), submitted to the IPY Joint Committee for review and approval from lead investigators from the US, Canada, Greenland, Norway, Finland, Sweden and the Russian Federation. In addition, there were 10 National Initiatives (NI-projects undertaken during IPY beyond the IPY Joint Committee review process). Individual project details can be viewed at www.arctichealth.org. The AHHI currently monitors the progress of 28 individual active human health projects in the following thematic areas: health network expansion (5 projects), infectious disease research (7 projects), environmental health research (7 projects), behavioral and mental health research (4 projects), and outreach education and communication (5 projects). While some projects have been completed, others will continue well beyond the IPY. The IPY 2007-2008 represented a unique opportunity to further stimulate cooperation and coordination on Arctic health research and increase the awareness and visibility of Arctic regions.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-15
... Service List for a Programmatic Agreement for Managing Properties Included in or Eligible for Inclusion in... programmatic agreement for managing properties included in, or eligible for inclusion in, the National Register...-captioned proceeding may request inclusion on the restricted service list, or may request that a restricted...
NASA Technical Reports Server (NTRS)
1997-01-01
This report covers the third six month period of the subject contract from January 26, 1997 to July 26, 1997. The contract statement of work covers four specific applications of Aeromover's 'N'-output differential technology that are being developed in cooperation with industry and NASA. A quantitative description of work, project difficulties, proposed solutions, and a statement of the work that will be performed during the next six months has been included for each of the four projects.
1980-01-01
reported in Burgess et al. (1973:19). Low bottom species in the study area include American elm (Ulmus americanus), green ash (Fraxinus pennsylvanica...deposits with "Calgon" before water screening. Because of slow permeability clay is very slippery when it becomes wet and can be hazardous to workers. The
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-19
... Environmental Impact Statement for the Proposed Hyde County Wind Energy Center Project, Hyde County, SD AGENCY... design, construct, operate, and maintain a 150-megawatt Hyde County Wind Energy Center Project (Project... terminated the NEPA process for NextEra's proposed Hyde County Wind Energy Center Project with the...
Poitras, Julien; Chauny, Jean-Marc; Lévesque, Jean-Frédéric; Ouimet, Mathieu; Dupuis, Gilles; Tanguay, Alain; Simard-Racine, Geneviève
2015-01-01
Introduction Health services research generates useful knowledge. Promotion of implementation of this knowledge in medical practice is essential. Prior to initiation of a major study on rural emergency departments (EDs), we deployed two knowledge transfer strategies designed to generate interest and engagement from potential knowledge users. The objective of this paper was to review: 1) a combined project launch and media press release strategy, and 2) a pre-study survey designed to survey potential knowledge users’ opinions on the proposed study variables. Materials and Methods We evaluated the impact of the project launch (presentation at two conferences hosted by key stakeholders) and media press release via a survey of participants/stakeholders and by calculating the number of media interview requests and reports generated. We used a pre-study survey to collect potential key stakeholder’ opinions on the study variables. Results Twenty-one of Quebec’s 26 rural EDs participated in the pre-study survey (81% participation rate). The press release about the study generated 51 press articles and 20 media request for interviews, and contributed to public awareness of a major rural research initiative. In the pre-study survey, thirteen participants (46%) mentioned prior knowledge of the research project. Results from the pre-study survey revealed that all of the potential study variables were considered to be relevant for inclusion in the research project. Respondents also proposed additional variables of interest, including factors promoting retention of human resources. Conclusions The present study demonstrated the potential utility of a two-pronged knowledge transfer strategy, including a combined formal launch and press release, and a pre-study survey designed to ensure that the included variables were of interest to participants and stakeholders. PMID:25849328
NASA Astrophysics Data System (ADS)
Shorikov, A. F.; Butsenko, E. V.
2017-10-01
This paper discusses the problem of multicriterial adaptive optimization the control of investment projects in the presence of several technologies. On the basis of network modeling proposed a new economic and mathematical model and a method for solving the problem of multicriterial adaptive optimization the control of investment projects in the presence of several technologies. Network economic and mathematical modeling allows you to determine the optimal time and calendar schedule for the implementation of the investment project and serves as an instrument to increase the economic potential and competitiveness of the enterprise. On a meaningful practical example, the processes of forming network models are shown, including the definition of the sequence of actions of a particular investment projecting process, the network-based work schedules are constructed. The calculation of the parameters of network models is carried out. Optimal (critical) paths have been formed and the optimal time for implementing the chosen technologies of the investment project has been calculated. It also shows the selection of the optimal technology from a set of possible technologies for project implementation, taking into account the time and cost of the work. The proposed model and method for solving the problem of managing investment projects can serve as a basis for the development, creation and application of appropriate computer information systems to support the adoption of managerial decisions by business people.
5 CFR 470.305 - Submission of proposals for demonstration projects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... projects. 470.305 Section 470.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.305 Submission of proposals for demonstration projects. (a) OPM...
Real-time multimedia communications in medical emergency - the CONCERTO project solution.
Martini, Maria G; Iacobelli, Lorenzo; Bergeron, Cyril; Hewage, Chaminda T; Panza, Gianmarco; Piri, Esa; Vehkapera, Janne; Amon, Peter; Mazzotti, Matteo; Savino, Ketty; Bokor, Laszlo
2015-01-01
The management of medical emergency, in particular cardiac emergency, requests prompt intervention and the possibility to communicate in real time from the emergency area / ambulance to the hospital as much diagnostic information as possible about the patient. This would enable a prompt emergency diagnosis and operation and the possibility to prepare the appropriate actions in the suitable hospital department. To address this scenario, the CONCERTO European project proposed a wireless communication system based on a novel cross-layer architecture, including the integration of building blocks for medical media content fusion, delivery and access. This paper describes the proposed system architecture, outlining the developed components and mechanisms, and the evaluation of the proposed system, carried out in a hospital with the support of medical staff. The technical results and the feedback received highlight the impact of the CONCERTO approach in the healthcare domain, in particular in enabling a prompt and reliable diagnosis in challenging medical emergency scenarios.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-10-01
The Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed A-01 outfall constructed wetlands project at the Savannah River site (SRS), located near aiken, South Carolina. The proposed action would include the construction and operation of an artificial wetland to treat effluent from the A-01 outfall located in A Area at SRS. The proposed action would reduce the outfall effluent concentrations in order to meet future outfall limits before these go into effect on October 1, 1999. This document was prepared in compliance with the National Environmental Policy Act (NEPA)more » of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR Parts 1500--1508); and the DOE Regulations for Implementing NEPA (10 CFR Part 1021).« less
ERIC Educational Resources Information Center
Gallimore, Ronald; And Others
This report summarizes the programmatic features of a proposal for the Kamehameha Early Education Project (KEEP), a program aimed at the development, demonstration, and dissemination of methods for improving the education of Hawaiian and part-Hawaiian children. A brief description of the proposed project goals, structure, organization, and…
NASA Technical Reports Server (NTRS)
1982-01-01
The programmatic data for the reference concept of the Manned Space Platform is presented. Details regarding work breakdown structure (WBS) and dictionary, the facilities and equipment required to produce the modules, the project schedule and logic diagram, a preliminary assessment of environmental impacts and details regarding the estimated costs for the reference concept are included. The proposed WBS which was developed to provide summary and system level segregation of the nonrecurring and recurring portions of the Manned Space Platform project is also included. The accompanying dictionary outlines the function and activities contained within each WBS element. The facility and equipment required to produce the various modules is discussed. Generally, required equipment is within the existing state of the art although the size of some of the items to be manufactured is a consideration. A preliminary manufacturing flow was also provided. The project schedules presented consist of the Master Project Summary Schedule, the Master Project Phasing Chart and the Logic Network.
Electric Vehicle Sharing Planning and Operations
DOT National Transportation Integrated Search
2018-02-01
Dongfang Zhao (ORCID ID 0000-0002-5424-9915); Xiaopeng (Shaw) Li (ORCID ID 0000-0002-5264-3775); Yu Zhang (ORCID ID 0000-0003-1202-626X) This project includes literature review and proposing a model for EV planning and operations. We first conducted ...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-20
... the potential from offshore wind power to other electric power sources, including fossil, nuclear and... for their proposed projects on the OCS. BOEMRE/New Jersey Renewable Energy Task Force BOEMRE formed...
A Right Now Project: How To Get Ready To Go Metric in Your School District
ERIC Educational Resources Information Center
Izzi, John
1973-01-01
Itemizes planning proposals to facilitate conversion of the educational system to metrics, including administrative committees and personnel training courses. Suggestions for purchasing materials and equipment refer the reader to several specific titles. (WM)
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2012 CFR
2012-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
What drives continuous improvement project success in healthcare?
Stelson, Paul; Hille, Joshua; Eseonu, Chinweike; Doolen, Toni
2017-02-13
Purpose The purpose of this paper is to present findings from a study of factors that affect continuous improvement (CI) project success in hospitals. Design/methodology/approach Quantitative regression analysis was performed on Likert scale survey responses. Qualitative thematic analysis was performed on open-ended survey responses and written reports on CI projects. Findings The paper identifies managerial and employee factors that affect project success. These factors include managerial support, communication, and affective commitment. Affective commitment is the extent to which employees perceive the change as being needed or necessary. Practical implications The results highlight how managerial decisions, approaches to communication - including communication before, during and after CI projects affect project success. The results also show that success depends on the way employees perceive proposed changes. This suggests the need for a more individualized approach to CI, lean, and broader change initiatives. Originality/value This research is the first to fuse project success and sustainability theory to CI projects, beyond Kaizen events, in healthcare environments. The research is particularly important at a time when healthcare organizations are required to make rapid changes with limited resources as they work toward outcome-based assessment and reimbursement rules.
Evaluation of Embedded System Component Utilized in Delivery Integrated Design Project Course
NASA Astrophysics Data System (ADS)
Junid, Syed Abdul Mutalib Al; Hussaini, Yusnira; Nazmie Osman, Fairul; Razak, Abdul Hadi Abdul; Idros, Mohd Faizul Md; Karimi Halim, Abdul
2018-03-01
This paper reports the evaluation of the embedded system component utilized in delivering the integrated electronic engineering design project course. The evaluation is conducted based on the report project submitted as to fulfil the assessment criteria for the integrated electronic engineering design project course named; engineering system design. Six projects were assessed in this evaluation. The evaluation covers the type of controller, programming language and the number of embedded component utilization as well. From the evaluation, the C-programming based language is the best solution preferred by the students which provide them flexibility in the programming. Moreover, the Analog to Digital converter is intensively used in the projects which include sensors in their proposed design. As a conclusion, in delivering the integrated design project course, the knowledge over the embedded system solution is very important since the high density of the knowledge acquired in accomplishing the project assigned.
WindFloat Pacific Project, Final Scientific and Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Banister, Kevin
2017-01-17
PPI’s WindFloat Pacific project (WFP) was an up to 30 MW floating offshore wind demonstration project proposed off the Coast of Oregon. The project was to be sited approximately 18 miles due west of Coos Bay, in over 1000 ft. of water, and is the first floating offshore wind array proposed in the United States, and the first offshore wind project of any kind proposed off the West Coast. PPI’s WindFloat, a semi-submersible foundation designed for high-capacity (6MW+) offshore wind turbines, is at the heart of the proposed project, and enables access to the world class wind resource at themore » project site and, equally, to other deep water, high wind resource areas around the country.« less
Yakima Fisheries Project : Revised Draft Environmental Impact Statement.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration.
1995-05-01
BPA proposes to fund several fishery-related activities in the Yakima River Basin. The Yakima Fisheries Project (YFP), included in the Northwest Power Planning Council`s fish and wildlife program, would be jointly managed by the State of Washington and the Yakima Indian Nation. Fisheries resources in the Yakima River are severely reduced from historical levels and there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities basedmore » on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. The project has been considerably revised from the original proposal described in the first draft EIS. Examined in addition to No Action (which would leave present anadromous fisheries resources unchanged in the, Basin) are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of re-establishing (via stock imported from another basin) naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 has been identified as the preferred action. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-27
... Draft Environmental Impact Statement for a Proposed Flood Risk Management Project on the Red River of... Study (EIS/FS) for a Proposed Fargo- Moorhead Flood Risk Management Project on the Red River of the North in Fargo, ND, and Moorhead, MN (Proposed Fargo-Moorhead Project). On May 5, 2009, the St. Paul...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-11
... Proposed Information Collection to OMB; Contractor's Requisition--Project Mortgages AGENCY: Office of the.... Contractor's monthly application for distribution of insured mortgage proceeds for construction costs... Following Information Title of Proposal: Contractor's Requisition--Project Mortgages. OMB Approval Number...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-22
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14064-000] Amnor Hydro West... Hydropower Project (Horn Rapids Project or project). The proposed project is located on the Yakima River... upon lands or waters owned by others without the owners' express permission. The proposed project would...
A modular projection autostereoscopic system for stereo cinema
NASA Astrophysics Data System (ADS)
Elkhov, Victor A.; Kondratiev, Nikolai V.; Ovechkis, Yuri N.; Pautova, Larisa V.
2009-02-01
The lenticular raster system for 3D movies non-glasses show designed by NIKFI demonstrated commercially in Moscow in the 40'st of the last century. Essential lack of this method was narrow individual viewing zone as only two images on the film used. To solve this problem, we propose to use digital video projective system with modular principle of its design. Increase of the general number of the pixels forming the stereo image is reached by using of more than one projector. The modular projection autostereoscopic system for demonstration of the 3D movies includes diffuser screen; lenticular plate located in front of the screen; projective system consisted from several projectors and the block of parallax panoramogram fragments creator. By means of this block the parallax panoramogram is broken into fragments which quantity corresponds to number of projectors. For the large dimension lenticular screen making rectangular fragments of inclined raster were joined in a uniform leaf. To obtain the needed focal distance of the screen lenses we used immersion - aqueous solution of glycerin. The immersion also let essentially decrease visibility of fragments joints. An experimental prototype of the modular projection autostereoscopic system was created to validate proposed system.
de Vries, Jantina; Jallow, Muminatou; Williams, Thomas N.; Kwiatkowski, Dominic; Parker, Michael; Fitzpatrick, Raymond
2013-01-01
A common assumption in genomics research is that the use of ethnic categories has the potential to lead to ethnic stigmatisation – particularly when the research is done on minority populations. Yet few empirical studies have sought to investigate the relation between genomics and stigma, and fewer still with a focus on Africa. In this paper, we investigate the potential for genomics research to lead to harms to ethnic groups. We carried out 49 semi-structured, open-ended interviews with stakeholders in a current medical genomics research project in Africa, MalariaGEN. Interviews were conducted with MalariaGEN researchers, fieldworkers, members of three ethics committees who reviewed MalariaGEN project proposals, and with members of the two funding bodies providing support to the MalariaGEN project. Interviews were conducted in Kenya, The Gambia and the UK between June 2008 and October 2009. They covered a range of aspects relating to the use of ethnicity in the genomics project, including views on adverse effects of the inclusion of ethnicity in such research. Drawing on the empirical data, we argue that the risk of harm to ethnic groups is likely to be more acute in specific types of genomics research. We develop a typology of research questions and projects that carry a greater risk of harm to the populations included in genomics research. We conclude that the potential of generating harm to ethnic groups in genomics research is present if research includes populations that are already stigmatised or discriminated against, or where the research investigates questions with particular normative implications. We identify a clear need for genomics researchers to take account of the social context of the work they are proposing to do, including understanding the local realities and relations between ethnic groups, and whether diseases are already stigmatised. PMID:22749442
PrEFiNe Plan: Strategic plan for Fabry diseases in Nephrology.
Del Pino, M D; Ortiz, A; Torra, R; Hernandez, D
2016-01-01
Renal failure is one of the main causes of death in patients with Fabry disease (FD). Due to the low prevalence of FD, delayed diagnosis and misdiagnosis, often the correct diagnosis is made when organ damage is already present. Early recognition of the disease would allow the prevention of severe complications and the premature death of patients with FD. We present here the PrEFiNE project, which includes a wide spectrum of activities with the aim of improve knowledge and diagnosis of FD. The project is sponsored by Shire Iberia (http://shireiberica.com/) From January 2016 to the end of 2017 several activities will be carried out, starting with a survey to evaluate current FD knowledge among nephrologists; in addition some studies to assess prevalence of this disease will be performed. One study will include patients receiving dialysis, another study will cover kidney transplant patients, and a pilot study in chronic kidney disease in stage 3-5 predialysis. Also planned is a pharmacoeconomic study to focus on burden of FD. At the same time medical education activities will be conducted both on line and on site. Plan for dissemination will include medical publications and diffusion to media. PrEFiNE Project will finish with the publication of a compilation book on FD in Nephrology including all planned activities and proposing recommendations based on results and detected unmet needs. PrEfiNE Plan will be coordinated by severa scientific committees, one at national level and 10 other regionals comittees, tha will be responsible to ensure the maximum scientific quality of proposed activities. An advisory board will supervise the project. PrEfiNE project will evaluate an action plan focused on improving FD knowledge to make necessary recommendations for an early recognition of the disease. In addition will generate a plan to improve previously undetected needs. Copyright © 2016 Sociedad Española de Nefrología. Published by Elsevier España, S.L.U. All rights reserved.
Garrison Project - Lake Sakakawea Oil and Gas Management Plan, North Dakota
2012-11-01
When the air gun is fired , pulses of acoustic energy are produced causing the shock waves needed for data collection (Peterson, 2004). • Seismic...The proposed casing program shall include the size, weight, grade, and length of casing proposed, type of thread and coupling, and setting depth of...suppression of fires on public lands caused by its employees, contractors or subcontractors. During conditions of extreme fire danger, surface use
Novel Surface Modification Method for Ultrasupercritical Coal-Fired Boilers
DOE Office of Scientific and Technical Information (OSTI.GOV)
Xiao, T. Danny
2013-05-22
US Department of Energy seeks an innovative coating technology for energy production to reduce the emission of SOx, NOx, and CO2 toxic gaseous species. To realize this need, Inframat Corporation (IMC) proposed an SPS thermal spray coating technique to produce ultrafine/nanocoatings that can be deposited onto the surfaces of high temperature boiler tubes, so that higher temperatures of boiler operation becomes possible, leading to significantly reduced emission of toxic gaseous species. It should be noted that the original PI was Dr. Xinqing Ma, who after 1.5 year conducting this project left Inframat in December, 2008. Thus, the PI was transferredmore » to Dr. Danny Xiao, who originally co-authored the proposal with Dr. Ma, in order to carry the project into a completion. Phase II Objectives: The proposed technology has the following attributes, including: (1). Dispersion of a nanoparticle or alloyed particle in a solvent to form a uniform slurry feedstock; (2). Feeding of the slurry feedstock into a thermal spray flame, followed by deposition of the slurry feedstock onto substrates to form tenacious nanocoatings; (3). High coating performance: including high bonding strength, and high temperature service life in the temperature range of 760oC/1400oF. Following the above premises, our past Phase I project has demonstrated the feasibility in small scale coatings on boiler substrates. The objective of this Phase II project was to focus on scale-up the already demonstrated Phase I work for the fabrication of SPS coatings that can satisfy DOE's emission reduction goals for energy production operations. Specifically, they are: (1). Solving engineering problems to scale-up the SPS-HVOF delivery system to a prototype production sub-delivery system; (2). Produce ultrafine/nanocoatings using the scale-up prototype system; (3). Demonstrate the coated components using the scale-up device having superior properties. Proposed Phase II Tasks: In the original Phase II proposal, we have six (6) technical tasks plus one (1) reporting task, as described below: Task 1 Scale-up and optimize the SPS process; Task 2 Coating design and fabrication with desired microstructure; Task 3 Evaluate microstructure and physical properties; Task 4 Test performance of long-term corrosion and erosion; Task 5 Test mechanical property and reliability; Task 6 Coating of a prototype boiler tube for evaluation; Task 7 Reporting task. To date, we have already completed all the technical tasks of 1 through 6. Major Phase II Achievements: In this four (4) year working period, Inframat had spent great effort to complete the proposed tasks. The project had been completed; the goals have been accomplished. Major achievements obtained include: (1). Developed a prototype scale-up slurry feedstock delivery system for thermal spray coatings; (2). Successfully coated high performance coatings using this scale-up slurry delivery system; (3). Commercial applications in energy efficiency and clean energy components have been developed using this newly fabricated slurry feedstock delivery system.« less
NASA Astrophysics Data System (ADS)
Watanabe, S.; Kim, H.; Utsumi, N.
2017-12-01
This study aims to develop a new approach which projects hydrology under climate change using super ensemble experiments. The use of multiple ensemble is essential for the estimation of extreme, which is a major issue in the impact assessment of climate change. Hence, the super ensemble experiments are recently conducted by some research programs. While it is necessary to use multiple ensemble, the multiple calculations of hydrological simulation for each output of ensemble simulations needs considerable calculation costs. To effectively use the super ensemble experiments, we adopt a strategy to use runoff projected by climate models directly. The general approach of hydrological projection is to conduct hydrological model simulations which include land-surface and river routing process using atmospheric boundary conditions projected by climate models as inputs. This study, on the other hand, simulates only river routing model using runoff projected by climate models. In general, the climate model output is systematically biased so that a preprocessing which corrects such bias is necessary for impact assessments. Various bias correction methods have been proposed, but, to the best of our knowledge, no method has proposed for variables other than surface meteorology. Here, we newly propose a method for utilizing the projected future runoff directly. The developed method estimates and corrects the bias based on the pseudo-observation which is a result of retrospective offline simulation. We show an application of this approach to the super ensemble experiments conducted under the program of Half a degree Additional warming, Prognosis and Projected Impacts (HAPPI). More than 400 ensemble experiments from multiple climate models are available. The results of the validation using historical simulations by HAPPI indicates that the output of this approach can effectively reproduce retrospective runoff variability. Likewise, the bias of runoff from super ensemble climate projections is corrected, and the impact of climate change on hydrologic extremes is assessed in a cost-efficient way.
Crawler Acquisition and Testing Demonstration Project Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
DEFIGH-PRICE, C.
2000-10-23
If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support finalmore » design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan includes the following: (1) Identification of acquisition strategy and plan to obtain a crawler based retrieval system; (2) Plan for sufficient cold testing to make a decision for W-523 and to comply with TPA Milestone M-45-03H; (3) Cost and schedule for path forward; (4) Responsibilities of the participants; and (5) The plan is supported by updated Level 1 logics, a Relative Order of Magnitude cost estimate and preliminary project schedule.« less
2011-10-01
nearest designated wild and scenic river segment is the Jemez River-East Fork, which is approximately 56 miles north of the project area. • Wetlands ...justice areas, wetlands , coastal resources, farmland, floodplains, and wild and scenic rivers. Resource issues that are appropriate for analysis...described within Appendix A of FAA Order 1050.1E), which are not located within the project area include: Coastal Resources; Farmlands; and Wild and
Code of Federal Regulations, 2010 CFR
2010-01-01
... dollar volume associated with the activity; (ii) An analysis of the impact of the proposed activity on... particular, including a copy of the feasibility study, management plan, financial projections, business plan...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-09
... (PPRs) to capture quarterly and annual reports for each project type (Infrastructure, Public Computer... Information Collection; Comment Request; Broadband Technology Opportunities Program (BTOP) Quarterly and..., which included competitive grants to expand public computer center capacity and innovative programs to...
76 FR 48801 - Notice of Central Idaho Resource Advisory Committee Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-09
... DEPARTMENT OF AGRICULTURE Forest Service Notice of Central Idaho Resource Advisory Committee... Self-Determination Act of 2000 (Pub. L. 110-343), the Salmon-Challis National Forest's Central Idaho..., Challis, Idaho. SUPPLEMENTARY INFORMATION: Agenda topics will include, presentation of proposed projects...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-02
... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5380-N-24] Notice of Proposed Information Collection: Comment Request; Multifamily Project Monthly Accounting Reports AGENCY: Office of the... information: Title of Proposal: Multifamily Project Monthly Accounting Reports. OMB Control Number, if...
Recovery Act : Heterogeneous Feed Biorefinery Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schofield, Richard
2015-03-15
To overcome the hurdles associated with introducing a new technology, Enerkem applied to the US DOE for grant assistance with its Pontotoc, Mississippi, biorefinery under the DOE’s Demonstration of Integrated Biorefinery Operations FOA. Consistent with Enerkem’s strategic approach, the project proposed uses post sorted municipal solid waste blended with other forest residue. The proposed biorefinery is to be located within the boundaries of a working landfill, thus simplifying many aspects of environmental permitting while also reducing feedstock acquisition and transportation costs. An economic impact analysis was conducted using an adaptation of the US Department of Energy’s JEDI (Jobs and Economicmore » Development Impact) model for an ethanol-producing biorefinery. The JEDI model, which does not have a thermochemical processing option, had to be configured to reflect a biomass feedstock and was thus adapted by Enerkem to account for the unique feedstock requirements and operations of the Project. According to this model, development, construction, and 2 years of operation of the biorefinery require an investment of approximately $140 million. Also, a construction period of 18 months will create significant direct and indirect employment. Indirect employment includes steel manufacturers, construction materials manufacturers, material shipping, equipment manufacturers and fabrication, etc. During the construction phase of the Project, 210 total jobs are expected to be created, including 145 direct jobs and 72 indirect or induced jobs. During the operating period, 131 jobs would be created, 95 of which are direct. It is anticipated that the project will create at least 10 new jobs (included in the above figures and in addition to the JEDI data) in the sorting and recycling sector, since the project will require operations in sorting MSW since valuable ferrous, nonferrous and recyclable plastic materials will be sorted from MSW as part of the process that isolates MSW-derived biomass.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-02
... require the filling of approximately 29.7 acres of waters of the United States, including wetlands. The... projects in the Sunridge Specific Plan area have been built. The Proposed Action is the construction of the... approximately 1.4 acres of waters of the U.S., including wetlands, to construct 134 houses, roadways, and other...
Establishing the Rule of Law through Networking and Leadership
2016-06-24
proposed network will include governmental organizations, intergovernmental organizations, nongovernmental organizations, and multinational corporations ...of projects which were quickly and poorly executed. They would also likely argue for the inclusion of corporate entities in the network, and for the...third suggestion is that this network be mobilized early; plans should be in place, and the nodes of the network, including finance , personnel, and
Research activities of the Geodynamics Branch
NASA Technical Reports Server (NTRS)
Kahn, W. D. (Editor); Cohen, S. C. (Editor)
1984-01-01
A broad spectrum of geoscience disciplines including space geodesy, geopotential field modeling, tectonophysics, and dynamic oceanography are discussed. The NASA programs, include the Geodynamics and Ocean Programs, the Crustal Dynamics Project, the proposed Ocean Topography Experiment (TOPEX), and the Geopotential Research Mission (GRM). The papers are grouped into chapters on Crustal Movements, Global Earth Dynamics, Gravity Field Model Development, Sea Surface Topography, and Advanced Studies.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barrows, E.S.; Antrim, L.D.; Pinza, M.R.
1996-08-01
The U.S. Army Corps of Engineers (USACE) is authorized by Section 103 of the Marine Protection, Research, and Sanctuaries Act of 1972 (MPRSA), Public Law 92-532, and by the Clean Water Act of 1972 (CWA) and Amendments of 1977 to permit, evaluate, and regulate the disposal of dredged material in ocean waters to minimize adverse environmental effects. Compliance with the regulations of the MPRSA calls for physical and biological testing of sediment proposed for dredging prior to its disposal in ocean waters. The testing required by the MPRSA criteria is conducted under a testing manual developed by the USACE andmore » the U.S. Environmental Protection Agency (EPA), Evaluation of Dredged Material Proposed for Ocean Disposal (Testing Manual), commonly referred to as the `Green Book.` Testing protocols in the Green Book include bulk sediment analysis, grain size analysis, elutriate testing, and biological testing. The biological testing includes bioassays for acute toxicity as well as analysis to determine bioaccumulation of certain contaminants by marine organisms. The objective of the USACE-NYD Federal Projects Program was to evaluate sediment proposed for dredging and unconfined ocean disposal at the Mud Dump Site. The results of analytical measurements and bioassays performed on the test sediments were compared with analyses of sediment from the Mud Dump Reference Site to determine whether the test sediments were acutely toxic to marine organisms or resulted in statistically significantly greater bioaccumulation of contaminants in marine organisms, relative to the reference sediment. Testing for the federal project areas was performed according to the requirements.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shrivastava, V.K.; Sandell, D.H.
The Government of Thailand is implementing a Southern Seaboard Development Project. The developing of the project will increase demand for all utility and infrastructure systems and services. The distribution of electric power in the new area falls within the responsibility of the Provincial Electricity Authority (PEA). The U.S. Trade and Development Program (TDP) funded a Definitional Mission to evaluate the prospects of TDP funding a feasibility study for an I-Shaped power interconnection study for supplying electricity to the 15 provinces in Southern Thailand. The mission concluded that TDP should provide a grant to PEA to select a U.S. firm tomore » carry out the proposed I-Shaped Interconnection study for power distribution in southern Thailand. The overall potential for exports resulting from the project is conservatively estimated at $120 million, not including any follow-on work and spare parts inventory, typical of such projects. TDP's program in Thailand has enjoyed enviable success in exports and TDP's support of the proposed feasibility study will clearly maintain and very likely add to that momentum.« less
Enhancing Knowledge Sharing Management Using BIM Technology in Construction
Ho, Shih-Ping; Tserng, Hui-Ping
2013-01-01
Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology. PMID:24723790
Enhancing knowledge sharing management using BIM technology in construction.
Ho, Shih-Ping; Tserng, Hui-Ping; Jan, Shu-Hui
2013-01-01
Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology.
Conservation reaches new heights.
Pepall, J; Khanal, P
1992-10-01
The conservation program with the management assistance of the Woodlands Mountain Institute in 2 contiguous parks, the Mount Everest National Park in Nepal and the Qomolangma Nature Reserve in China, in 2 countries is described. The focus is on conservation of the complex ecosystem with sustainable development by showing local people how to benefit from the park without environmental damage. Cultural diversity is as important as biological diversity. The area has been designated by UNESCO as a World Heritage Site with the "last pure ecological seed" of the Himalayas. The regional geography and culture are presented. Population growth has impacted natural resources through overgrazing, cultivation of marginal land, and deforestation; future plans to build a dam and road bordering the nature reserve pose other threats. Proposed management plans for the Makalu-Barun Nature Park (established in November 1991) and Conservation Area include a division of the park into nature reserve areas free of human activity, protected areas which permit traditional land use, and special sites and trail for tourists and religious pilgrims. The conservation area will act as a buffer for the park and provide economic opportunities; further subdivisions include land use for biodiversity protection, community forest and pasture, agroforestry, and agriculture and settlement. Efforts will be made to increase the welfare of women and local people; proposed projects include the introduction of higher milk-producing animals for stall feeding. Also proposed is a cultural and natural history museum. 70% of the project's resources will be directed to local community participation in consultation and park maintenance. The project is a model of how conservation and protection of natural resources can coexist with local economic development and participation; an integration of preservation of biological diversity, mountain wisdom, and the value of local people as resources for conservation.
77 FR 6624 - Notice of Limitation on Claims Against Proposed Public Transportation Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-08
... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... for the listed public transportation project will be barred unless the claim is filed on or before... approvals for the public transportation projects listed below. The actions on these projects, as well as the...
76 FR 19522 - Notice of Limitation on Claims Against Proposed Public Transportation Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-07
... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... herein for the listed public transportation projects will be barred unless the claim is filed on or... approvals for the public transportation projects listed below. The actions on these projects, as well as the...
76 FR 60963 - Notice of Limitation on Claims Against Proposed Public Transportation Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-30
... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or... the public transportation projects listed below. The actions on these projects, as well as the laws...
NASA Astrophysics Data System (ADS)
Cuellar, A. D.; McKinney, D. C.
2014-12-01
Climate change has accelerated glacial retreat in high altitude glaciated regions of Peru leading to the growth and formation of glacier lakes. Glacial lake outburst floods (GLOF) are sudden events triggered by an earthquake, avalanche into the lake or other shock that causes a sudden outflow of water. These floods are catastrophic because of their sudden onset, the difficulty predicting them, and enormous quantity of water and debris rapidly flooding downstream areas. Palcacocha Lake in the Peruvian Andes has experienced accelerated growth since it burst in 1941 and threatens the major city of Huaraz and surrounding communities. Since the 1941 flood stakeholders have advocated for projects to adapt to the increasing threat posed by Palcacocha Lake. Nonetheless, discussions surrounding projects for Palcacocha have not included a rigorous analysis of the potential consequences of a flood, probability of an event, or costs of mitigation projects. This work presents the first step to rationally analyze the risks posed by Palcacocha Lake and the various adaptation projects proposed. In this work the authors use decision analysis to asses proposed adaptation measures that would mitigate damage in downstream communities from a GLOF. We use an existing hydrodynamic model of the at-risk area to determine how adaptation projects will affect downstream flooding. Flood characteristics are used in the HEC-FIA software to estimate fatalities and injuries from an outburst flood, which we convert to monetary units using the value of a statistical life. We combine the monetary consequences of a GLOF with the cost of the proposed projects and a diffuse probability distribution for the likelihood of an event to estimate the expected cost of the adaptation plans. From this analysis we found that lowering the lake level by 15 meters has the least expected cost of any proposal despite uncertainty in the effect of lake lowering on flooding downstream.
Puerto Rico`s EcoElectrica LNG/power project marks a project financing first
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lammers, R.; Taylor, S.
1998-02-23
On Dec. 15, 1997, Enron International and Kenetech Energy Services achieved financial close on the $670 million EcoElectrica liquefied natural gas terminal and cogeneration project proposed for Puerto Rico. The project involves construction of a liquefied natural gas terminal, cogeneration plant, and desalination unit on the southern coast of Puerto Rico, in the Penuelas/Guayanilla area. EcoElectrica will include a 500-mw, combined-cycle cogeneration power plant fueled mainly by LNG imported from the 400 MMcfd Atlantic LNG project on the island of Trinidad. Achieving financial close on a project of this size is always a time-consuming matter and one with a numbermore » of challenges. These challenges were increased by the unique nature of both the project and its financing--no project financing had ever before been completed that combined an LNG terminal and power plant. The paper discusses the project, financing details and challenges, key investment considerations, and integrated project prospects.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-06
... Environmental Impact Statement/ Environmental Impact Report for the Proposed Ballona Wetlands Restoration...) for the proposed Ballona Wetlands Restoration Project. The proposed project is intended to return the... biological functions and services in the project area. Restoring the wetland functions and services would...
75 FR 8408 - Agency Information Collection Activities: Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-24
...Under the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3501 et seq.), and as part of its continuing effort to reduce paperwork and respondent burden, the National Science Foundation (NSF) is inviting the general public or other Federal agencies to comment on this proposed continuing information collection. The NSF will publish periodic summaries of the proposed projects. Comments: Comments are invited on (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the Agency, including whether the information shall have practical utility; (b) the accuracy of the Agency's estimate of the burden of the proposed collection of information; (c) ways to enhance the quality, utility, and clarity of the information to respondents, including through the use of automated collection techniques or other forms of information technology; and (d) ways to minimize the burden of the collection of information on those who are to respond, including through the use of appropriate automated, electronic, mechanical, or other technological collection techniques or other forms of information technology.
NASA Technical Reports Server (NTRS)
Koenig, John C.; Billitti, Joseph W.; Tallon, John M.
1979-01-01
Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-12-31
To provide the necessary administrative support to assure that the scientific and educational goals of the project are obtained and to assure that all Department of Energy reporting requirements and requests are fulfilled.The grant reporting is divided into three aspects: Collaborative Cluster projects, Initiation projects and Education projects. A cluster project is one or more closely related collaborative, multidisciplinary research projects in which a group of investigators employs a synergistic approach to the solution of problems in the same general area of research. An initiation project typically involves a single investigator. The purpose of the project is to undertaken pilotmore » work, lasting no more than one year, which will lead to the successful submission of an externally-funded proposal or the development of a collaborative cluster project. The education projects are designed to develop courses with emphasis on environmental studies and/or to train students in areas of environmental research. Accomplishments this quarter are: (1) Issued a request for proposals (RFP) to complete work during the next year of the project. Forty-two proposals were received in response to the RFP. (2) Selected and convened a panel of experts to review the proposals and make funding recommendations. (3) Assigned each proposal to two or more reviewers and sent copies of all proposals to each review panelist. (4) Interfaced with Oak Ridge National Laboratory regarding QA/QC issues related to sampling and analysis for the project. (5) Held numerous phone conversations with DOE representatives regarding funding allocations procedure changes as a result of the delays in the Federal budget and appropriations process this year. This quarterly report briefly describes research projects ongoing in this program.« less
Automated Procurement System (APS): Project management plan (DS-03), version 1.2
NASA Technical Reports Server (NTRS)
Murphy, Diane R.
1994-01-01
The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
Hanford Spent Nuclear Fuel Project recommended path forward
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fulton, J.C.
The Spent Nuclear Fuel Project (the Project), in conjunction with the U.S. Department of Energy-commissioned Independent Technical Assessment (ITA) team, has developed engineered alternatives for expedited removal of spent nuclear fuel, including sludge, from the K Basins at Hanford. These alternatives, along with a foreign processing alternative offered by British Nuclear Fuels Limited (BNFL), were extensively reviewed and evaluated. Based on these evaluations, a Westinghouse Hanford Company (WHC) Recommended Path Forward for K Basins spent nuclear fuel has been developed and is presented in Volume I of this document. The recommendation constitutes an aggressive series of projects to construct andmore » operate systems and facilities to safely retrieve, package, transport, process, and store K Basins fuel and sludge. The overall processing and storage scheme is based on the ITA team`s proposed passivation and vault storage process. A dual purpose staging and vault storage facility provides an innovative feature which allows accelerated removal of fuel and sludge from the basins and minimizes programmatic risks beyond any of the originally proposed alternatives. The projects fit within a regulatory and National Environmental Policy Act (NEPA) overlay which mandates a two-phased approach to construction and operation of the needed facilities. The two-phase strategy packages and moves K Basins fuel and sludge to a newly constructed Staging and Storage Facility by the year 2000 where it is staged for processing. When an adjoining facility is constructed, the fuel is cycled through a stabilization process and returned to the Staging and Storage Facility for dry interim (40-year) storage. The estimated total expenditure for this Recommended Path Forward, including necessary new construction, operations, and deactivation of Project facilities through 2012, is approximately $1,150 million (unescalated).« less
NASA Astrophysics Data System (ADS)
Camerlenghi, Angelo; Aoisi, Vanni; Lofi, Johanna; Hübscher, Christian; deLange, Gert; Flecker, Rachel; Garcia-Castellanos, Daniel; Gorini, Christian; Gvirtzman, Zohar; Krijgsman, Wout; Lugli, Stefano; Makowsky, Yizhaq; Manzi, Vinicio; McGenity, Terry; Panieri, Giuliana; Rabineau, Marina; Roveri, Marco; Sierro, Francisco Javier; Waldmann, Nicolas
2014-05-01
In May 2013, the DREAM MagellanPlus Workshop was held in Brisighella (Italy). The initiative builds from recent activities by various research groups to identify potential sites to perform deep-sea scientific drilling in the Mediterranean Sea across the deep Messinian Salinity Crisis (MSC) sedimentary record. In this workshop three generations of scientists were gathered: those who participated in formulation of the deep desiccated model, through DSDP Leg 13 drilling in 1973; those who are actively involved in present-day MSC research; and the next generation (PhD students and young post-docs). The purpose of the workshop was to identify locations for multiple-site drilling (including riser-drilling) in the Mediterranean Sea that would contribute to solve the several open questions still existing about the causes, processes, timing and consequences at local and planetary scale of an outstanding case of natural environmental change in the recent Earth history: the Messinian Salinity Crisis in the Mediterranean Sea. The product of the workshop is the identification of the structure of an experimental design of site characterization, riser-less and riser drilling, sampling, measurements, and down-hole analyses that will be the core for at least one compelling and feasible multiple phase drilling proposal. Particular focus has been given to reviewing seismic site survey data available from different research groups at pan-Mediterranean basin scale, to the assessment of additional site survey activity including 3D seismics, and to ways of establishing firm links with oil and gas industry. The scientific community behind the DREAM initiative is willing to proceed with the submission to IODP of a Multi-phase Drilling Project including several drilling proposals addressing specific drilling objectives, all linked to the driving objectives of the MSC drilling and understanding . A series of critical drilling targets were identified to address the still open questions related to the MSC event. Several proposal ideas also emerged to support the Multi-phase drilling project concept: Salt tectonics and fluids, Deep stratigraphic and crustal drilling in the Gulf of Lion (deriving from the GOLD drilling project), Deep stratigraphic and crustal drilling in the Ionian Sea, Deep Biosphere, Sapropels, and the Red Sea. A second MagellanPlus workshop held in January 2014 in Paris (France), has proceeded a step further towards the drafting of the Multi-phase Drilling Project and a set of pre-proposals for submission to IODP.
77 FR 58101 - Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-19
... information technology. DATES: Consideration will be given to all comments received by November 19, 2012... to SNPMIS Project Officer, DHSS, 7700 Arlington Boulevard, Falls Church, VA 22042-2902 or call 703... activities data including referral, evaluation, eligibility, and service plans. The Computer Security Act of...
36 CFR 1206.22 - What type of proposal is eligible for a publications grant?
Code of Federal Regulations, 2014 CFR
2014-07-01
... projects include the production of: (1) Documentary editions that involve collecting, compiling... records; (2) Microfilm editions consisting of organized collections of images of original sources, usually without transcription and annotations; (3) Electronic editions consisting of organized collections of...
36 CFR 1206.22 - What type of proposal is eligible for a publications grant?
Code of Federal Regulations, 2011 CFR
2011-07-01
... projects include the production of: (1) Documentary editions that involve collecting, compiling... records; (2) Microfilm editions consisting of organized collections of images of original sources, usually without transcription and annotations; (3) Electronic editions consisting of organized collections of...
36 CFR § 1206.22 - What type of proposal is eligible for a publications grant?
Code of Federal Regulations, 2013 CFR
2013-07-01
... projects include the production of: (1) Documentary editions that involve collecting, compiling... records; (2) Microfilm editions consisting of organized collections of images of original sources, usually without transcription and annotations; (3) Electronic editions consisting of organized collections of...
78 FR 63568 - Proposed Collection: Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-24
... December 23, 2013 to be assured of consideration. ADDRESSES: Direct all written comments to Yvette Lawrence... returns, and corporations that enter into certain tax-free reorganizations. The regulations provide rules for determining the tax consequences of a member's transfer (including by deconsolidation and...
DOT National Transportation Integrated Search
1991-07-01
Proposed research on this project included five main objectives: 1) To test and evaluate the physical characteristics of flyash concrete in comparions to non-flyash concrete. Tests will be conducted to see if flyash concrete meets OSHD specifications...
77 FR 59875 - Environmental Impact and Related Procedures
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-01
... activities ought to be expressly included in the CE, consistent with the principles underlying emergency projects and sound transportation asset management. The FHWA and the FTA seek comments on the proposals... for submitting comments. Mail: Docket Management Facility, U.S. Department of Transportation, 1200 New...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-09
... Collection; Comment Request; NOAA Restoration Center Performance Progress Report AGENCY: National Oceanic and... is for an extension of a currently approved information collection. NOAA funds habitat restoration projects including grass-roots, community-based habitat restoration; debris prevention and removal; removal...
76 FR 28233 - Agency Forms Undergoing Paperwork Reduction Act Review
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-16
... basis for research, design, and evaluation of interventions for schools seeking to prevent or reduce the.... Proposed Project Crime Prevention Through Environmental Design: Linking Observed School Environments with... priorities included in the Center's published research agenda focus on studying how physical environments...
A Model of Cooperation: The VALNet Project.
ERIC Educational Resources Information Center
Oberg, Larry R.
1986-01-01
Description of VALNet (Valley Library Consortium), a consortium of public, academic, and school libraries in Idaho, highlights proposed online public access union catalog which would include nonbibliographic and referral files and circulation and serials control modules. The political climate, marketing, needs assessment, support and consultation,…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-29
... affecting the quality of the human environment. The proposed Line N 2012 Expansion Project includes the...; The construction of a pig launcher/receiver \\1\\ at milepost 4.85; and \\1\\ A ``pig'' is a tool that is...
NASA Astrophysics Data System (ADS)
Han, Shenchao; Yang, Yanchun; Liu, Yude; Zhang, Peng; Li, Siwei
2018-01-01
It is effective to reduce haze in winter by changing the distributed heat supply system. Thus, the studies on comprehensive index system and scientific evaluation method of distributed heat supply project are essential. Firstly, research the influence factors of heating modes, and an index system with multiple dimension including economic, environmental, risk and flexibility was built and all indexes were quantified. Secondly, a comprehensive evaluation method based on AHP was put forward to analyze the proposed multiple and comprehensive index system. Lastly, the case study suggested that supplying heat with electricity has great advantage and promotional value. The comprehensive index system of distributed heating supply project and evaluation method in this paper can evaluate distributed heat supply project effectively and provide scientific support for choosing the distributed heating project.
Development of the New Educational Content "small Uas in Civil Engineering Application Scenarios"
NASA Astrophysics Data System (ADS)
Levin, E.; Vach, K.; Shults, R.
2017-12-01
The key point of this paper is presentation of the main idea and some results of the project "Small UAS in civil engineering application scenarios" (SUAS-CAS). This project was proposed by newly established in 2016 ISPRS WG V/7: "Innovative Technologies in Training Civil Engineers and Architects". Here we are presenting our experience in using low-cost UAS in training architects at Kyiv National University of Construction and Architecture, which was chosen as basic for this project. In the first part of paper, the project outline is presented. Then the first and possible follow project outcomes were described. In some details is described the training module "Small UAS in architecture" which was developed and included as a part of the subject "Architectural photogrammetry".
Performance modeling for large database systems
NASA Astrophysics Data System (ADS)
Schaar, Stephen; Hum, Frank; Romano, Joe
1997-02-01
One of the unique approaches Science Applications International Corporation took to meet performance requirements was to start the modeling effort during the proposal phase of the Interstate Identification Index/Federal Bureau of Investigations (III/FBI) project. The III/FBI Performance Model uses analytical modeling techniques to represent the III/FBI system. Inputs to the model include workloads for each transaction type, record size for each record type, number of records for each file, hardware envelope characteristics, engineering margins and estimates for software instructions, memory, and I/O for each transaction type. The model uses queuing theory to calculate the average transaction queue length. The model calculates a response time and the resources needed for each transaction type. Outputs of the model include the total resources needed for the system, a hardware configuration, and projected inherent and operational availability. The III/FBI Performance Model is used to evaluate what-if scenarios and allows a rapid response to engineering change proposals and technical enhancements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhang, Hongbin; Szilard, Ronaldo; Epiney, Aaron
Under the auspices of the DOE LWRS Program RISMC Industry Application ECCS/LOCA, INL has engaged staff from both South Texas Project (STP) and the Texas A&M University (TAMU) to produce a generic pressurized water reactor (PWR) model including reactor core, clad/fuel design and systems thermal hydraulics based on the South Texas Project (STP) nuclear power plant, a 4-Loop Westinghouse PWR. A RISMC toolkit, named LOCA Toolkit for the U.S. (LOTUS), has been developed for use in this generic PWR plant model to assess safety margins for the proposed NRC 10 CFR 50.46c rule, Emergency Core Cooling System (ECCS) performance duringmore » LOCA. This demonstration includes coupled analysis of core design, fuel design, thermalhydraulics and systems analysis, using advanced risk analysis tools and methods to investigate a wide range of results. Within this context, a multi-physics best estimate plus uncertainty (MPBEPU) methodology framework is proposed.« less
Science and applications on the space station: A strategic vision
NASA Technical Reports Server (NTRS)
1988-01-01
The central themes relating to science and applications on the Space Station for fiscal year 1989 are discussed. Materials science research is proposed in a wide variety of subfields including protein crystal growth, metallurgy, and properties of fluids. Also proposed are the U.S. Polar Platform, an Extended Duration Crew Operations Project, and a long-range Space Biology Research Project to investigate plant and animal physiology, gravitational biology, life support systems, and exobiology. The exterior of the Space Station will provide attachment points for payloads to study subjects such as the earth and its environment, the sun, other bodies in the solar system, and cosmic objects. Examples of such attached payloads are given. They include a plasma interaction monitoring system, observation of solar features and properties, studies of particle radiation from the sun, cosmic dust collection and analysis, surveys of various cosmic and solar rays, measurements of rainfall and wind and the study of global changes on earth.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dong, X; Petrongolo, M; Wang, T
Purpose: A general problem of dual-energy CT (DECT) is that the decomposition is sensitive to noise in the two sets of dual-energy projection data, resulting in severely degraded qualities of decomposed images. We have previously proposed an iterative denoising method for DECT. Using a linear decomposition function, the method does not gain the full benefits of DECT on beam-hardening correction. In this work, we expand the framework of our iterative method to include non-linear decomposition models for noise suppression in DECT. Methods: We first obtain decomposed projections, which are free of beam-hardening artifacts, using a lookup table pre-measured on amore » calibration phantom. First-pass material images with high noise are reconstructed from the decomposed projections using standard filter-backprojection reconstruction. Noise on the decomposed images is then suppressed by an iterative method, which is formulated in the form of least-square estimation with smoothness regularization. Based on the design principles of a best linear unbiased estimator, we include the inverse of the estimated variance-covariance matrix of the decomposed images as the penalty weight in the least-square term. Analytical formulae are derived to compute the variance-covariance matrix from the measured decomposition lookup table. Results: We have evaluated the proposed method via phantom studies. Using non-linear decomposition, our method effectively suppresses the streaking artifacts of beam-hardening and obtains more uniform images than our previous approach based on a linear model. The proposed method reduces the average noise standard deviation of two basis materials by one order of magnitude without sacrificing the spatial resolution. Conclusion: We propose a general framework of iterative denoising for material decomposition of DECT. Preliminary phantom studies have shown the proposed method improves the image uniformity and reduces noise level without resolution loss. In the future, we will perform more phantom studies to further validate the performance of the purposed method. This work is supported by a Varian MRA grant.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stewart, Shannon C.
2001-10-29
BPA proposes to fund a project with the Washington State Department of Fish and Wildlife that will restore historic spawning areas for chum salmon in Duncan Creek. Duncan Creek, a Washington tributary of the Columbia River, was traditionally an important spawning area for chum salmon. The spring seeps areas that chum historically used for spawning are still present in Duncan Creek, however during the past 30 years they have been covered by sediment and debris and infested with reed canary grass. This project proposes to rehabilitate these spawning channels in order to provide chum salmon with a protected spawning andmore » incubation environment. The proposed habitat rehabilitation project will include removing existing gravel in the seeps of Duncan Creek that contain mud, sand, and organics and replacing them with gravels that will maximize egg-to-fry survival rates for chum salmon. A trackhoe or similar equipment will be used to excavate the spawning sites. Invasive vegetation will be removed. Spawning channels will then be reconstructed using sediment free spawning gravels and base rock. Upon completion of work, all disturbed spring channel banks will be protected from erosion with staked coir fabric and revegetated with native willows. Plantings will help to restore native plant communities, increase stream channel shading, and reduce re-infestation by reed canary grass.« less
NASA Technical Reports Server (NTRS)
DeMott, Diana; Fuqua, Bryan; Wilson, Paul
2013-01-01
Once a project obtains approval, decision makers have to consider a variety of alternative paths for completing the project and meeting the project objectives. How decisions are made involves a variety of elements including: cost, experience, current technology, ideologies, politics, future needs and desires, capabilities, manpower, timing, available information, and for many ventures management needs to assess the elements of risk versus reward. The use of high level Probabilistic Risk Assessment (PRA) Models during conceptual design phases provides management with additional information during the decision making process regarding the risk potential for proposed operations and design prototypes. The methodology can be used as a tool to: 1) allow trade studies to compare alternatives based on risk, 2) determine which elements (equipment, process or operational parameters) drives the risk, and 3) provide information to mitigate or eliminate risks early in the conceptual design to lower costs. Creating system models using conceptual design proposals and generic key systems based on what is known today can provide an understanding of the magnitudes of proposed systems and operational risks and facilitates trade study comparisons early in the decision making process. Identifying the "best" way to achieve the desired results is difficult, and generally occurs based on limited information. PRA provides a tool for decision makers to explore how some decisions will affect risk before the project is committed to that path, which can ultimately save time and money.
76 FR 25773 - Notice of Limitation on Claims Against Proposed Public Transportation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-05
... Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice of... announced herein for the listed public transportation project will be barred unless the claim is filed on or... approvals for the public transportation project listed below. The actions on this project, as well as the...
76 FR 72746 - Notice of Limitation on Claims Against Proposed Public Transportation Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-25
... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... for the listed public transportation project will be barred unless the claim is filed on or before May... approvals for the public transportation projects listed below. The actions on these projects, as well as the...
76 FR 35939 - Notice of Limitation on Claims Against Proposed Public Transportation Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-20
... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or... approvals for the public transportation projects listed below. The actions on these projects, as well as the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-22
...: Antrim Micro-Hydropower Project. f. Location: The proposed Antrim Micro-Hydropower Project will be..., protests, and/or motions filed. k. Description of Project: The proposed Antrim Micro-Hydropower Project... and the project will not be connected to an interstate grid. When a Declaration of Intention is filed...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-02
...; Arizona; Bradshaw Vegetation Management Project AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact statement. SUMMARY: This project is a proposal to improve the health of.... The project area encompasses about 55,554 acres. Within the project area, the proposal is to...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shakib-Manesh, T.E.; Hirvonen, K.O.; Jalava, K.J.
2014-11-15
Environmental impacts of small scale projects are often assessed poorly, or not assessed at all. This paper examines the usability of the Rapid Impact Assessment Matrix (RIAM) as a tool to prioritize project proposals for small scale water restoration projects in relation to proposals' potential to improve the environment. The RIAM scoring system was used to assess and rank the proposals based on their environmental impacts, the costs of the projects to repair the harmful impacts, and the size of human population living around the sites. A four-member assessment group (The expert panel) gave the RIAM-scores to the proposals. Themore » assumed impacts of the studied projects at the Eastern Finland water systems were divided into the ecological and social impacts. The more detailed assessment categories of the ecological impacts in this study were impacts on landscape, natural state, and limnology. The social impact categories were impacts to recreational use of the area, fishing, industry, population, and economy. These impacts were scored according to their geographical and social significance, their magnitude of change, their character, permanence, reversibility, and cumulativeness. The RIAM method proved to be an appropriate and recommendable method for the small-scale assessment and prioritizing of project proposals. If the assessments are well documented, the RIAM can be a method for easy assessing and comparison of the various kinds of projects. In the studied project proposals there were no big surprises in the results: the best ranks were received by the projects, which were assumed to return watersheds toward their original state.« less
18 CFR 401.4 - Project applications and proposed revisions and changes.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Project applications and proposed revisions and changes. 401.4 Section 401.4 Conservation of Power and Water Resources... § 401.4 Project applications and proposed revisions and changes. (a) Applications for inclusion of new...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-13
... applicant proposes to install two crossflow turbines at the project rather than two double suction pump turbines as previously envisioned. The applicant also proposes to modify project operation by running the... proposed amendment would not change the project's hydraulic capacity or possible electrical output but...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-15
... Economic Studies Research Proposal Process and Project Management AGENCY: U.S. Census Bureau, Commerce... Project Management System by visiting the CES Web site ( http://www.ces.census.gov/index/php ) and click...) and instructions should be directed to Dr. Brian P. Holly, Project Review Coordinator, Center for...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
... Corridor Project, Utah, and the Proposed Pony Express Resource Management Plan Amendment AGENCY: Bureau of...)/Proposed Resource Management Plan Amendment (RMPA) for the Mona to Oquirrh Transmission Corridor Project... Final EIS/Proposed RMPA for the Mona to Oquirrh Transmission Corridor Project have been sent to affected...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-30
... opportunity for public comment on proposed data collection projects, the National Institute Heart, Lung, and... proposed projects to be submitted to the Office of Management and Budget (OMB) for review and approval. The... collection plans and instruments or request more information on the proposed project contact: Victoria...
75 FR 2491 - Trade Adjustment Assistance for Firms Program Fiscal Year 2009 Annual Report
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-15
... strengthen their marketing channels to more effectively reach service firms, it is expected that the number... a marketing/sales project or production/engineering project in their Adjustment Proposals, and 35... types of projects in Adjustment Proposals. More than half of all firms proposed to implement marketing...
1990-09-01
Reservoirs. For U. S. Army Corps of Engineers. 1974b Archaeological Reconnaissance of the Reelfoot - Lake No. 9 Project Impact Area, Fulton Co., Kentucky...bayous, and lakes . Major drainages in Crittenden County include the Tvronza River, Fifteenmile Bayou, Tenmile Bayou, and Big Creek. The proposed...and canadian geese (Branta canadensis). Fish from the larger streams, oxbow lakes and beaver ponds, were also an important food source for
Energy/environment/technology two visions, two directions
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fox-Penner, P.
1995-12-31
This paper compares the energy policies proposed by the U.S. Congress and the U.S. Department of Energy (DOE). Connections between energy, economy, environment, and technology are discussed in some detail. The National Energy Policy Plan of the DOE is summarized, and the impact of budget cuts proposed by Congress are projected. Aspects of the DOE plan which are emphasized include research and development, minimization of regulation, and eliminating redundant government and private industry efforts. 5 figs., 5 tabs.
NASA Technical Reports Server (NTRS)
2000-01-01
This paper presents, in viewgraph form, the 2005 Earth-Mars Round Trip. The contents include: 1) Lander; 2) Mars Sample Return Project; 3) Rover; 4) Rover Size Comparison; 5) Mars Ascent Vehicle; 6) Return Orbiter; 7) A New Mars Surveyor Program Architecture; 8) Definition Study Summary Result; 9) Mars Surveyor Proposed Architecture 2003, 2005 Opportunities; 10) Mars Micromissions Using Ariane 5; 11) Potential International Partnerships; 12) Proposed Integrated Architecture; and 13) Mars Exploration Program Report of the Architecture Team.
NASA Astrophysics Data System (ADS)
Singer, J.; Ryan, J. G.
2012-12-01
The Transforming Undergraduate Education in Science, Technology, Engineering, and Mathematics (TUES) program seeks to improve the quality of science, technology, engineering, and mathematics (STEM) education for all undergraduate students. Activities supported by the TUES program include the creation, adaptation, and dissemination of learning materials and teaching strategies, development of faculty expertise, implementation of educational innovations, and research on STEM teaching and learning. The TUES program especially encourages projects that have the potential to transform undergraduate STEM education and active dissemination and building a community of users are critical components of TUES projects. To raise awareness about the TUES program and increase both the quality and quantity of proposals submitted by geoscientists to the program, information sessions and proposal writing retreats are being conducted. Digital resources developed especially for the geosciences community are available at www.buffalostate.edu/RTUGeoEd to share information about the TUES program and the many ways this NSF program supports innovation in geoscience education. This presentation also addresses identified impediments to submitting a TUES proposal and strategies for overcoming reasons discouraging geoscientists from preparing a proposal and/or resubmitting a declined proposal.
Engineering works and the tidal Chesapeake
NASA Technical Reports Server (NTRS)
Hargis, W. J., Jr.
1972-01-01
The tidal tributaries of the ocean and coastal areas of the mid-Atlantic region and the ecological significance of engineering projects are discussed. The effects of engineering works on maritime environments and resources, with the Chesapeake Bay as the area of prime interest are examined. Significant engineering projects, both actual and proposed, are described. The conflict of navigational demands and maintenance of an estuarine environment for commercial and sport fishing and recreation is described. Specific applications of remote sensors for analyzing ecological conditions of the bay are included.
No Sunset and Extended Policies Cases (released in AEO2010)
2010-01-01
The Annual Energy Outlook 2010 Reference case is best described as a current laws and regulations case, because it generally assumes that existing laws and fully promulgated regulations will remain unchanged throughout the projection period, unless the legislation establishing them specifically calls for them to end or change. The Reference case often serves as a starting point for the analysis of proposed legislative or regulatory changes, a task that would be difficult if the Reference case included projected legislative or regulatory changes.
Positron studies of defected metals, metallic surfaces
NASA Astrophysics Data System (ADS)
Bansil, A.
Specific problems proposed under this project included the treatment of electronic structure and momentum density in various disordered and defected systems. Since 1987, when the new high-temperature superconductors were discovered, the project focused extensively on questions concerning the electronic structure and Fermiology of high-(Tc) superconductors, in particular, (1) momentum density and positron experiments, (2) angle-resolved photoemission intensities, and (3) effects of disorder and substitutions in the high-(Tc)'s. The specific progress made in each of these problems is summarized.
Biological assessment for the transfer of the DP land tract
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keller, D.C.
1996-10-01
The Department of Energy (DOE) is proposing to transfer to the County of Los Alamos up to 10-ha (25-ac) of federal land located in Technical Area-21 to be developed for commercial uses. Previous studies for the proposed land transfer area indicate that potential habitat for four threatened, endangered, and sensitive species occurs in or adjacent to the proposed land transfer area. These include the northern goshawk (federal species of concern), Mexican spotted owl (federal threatened), the spotted bat (federal species of concern, state threatened), die peregrine falcon (federal endangered, state endangered), and the. In order to determine the possible influencesmore » of the land transfer on these organisms, information from species-specific surveys was collected. These surveys were used to confirm the presence of these species or to infer their absence in or near the project area. It was concluded that none of die above mentioned species occur in the project area. Stretches of the stream channel within Los Alamos Canyon have been identified as palustrine and riverine, temporarily flooded wetlands. The proposed land transfer should not affect these wetlands.« less
Proposed Columbia Wind Farm No. 1 : Final Environmental Impact Statement, Joint NEPA/SEPA.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Klickitat County
1995-09-01
CARES proposes to construct and operate the 25 megawatt Columbia Wind Farm No. 1 (Project) in the Columbia Hills area of Klickitat County, Washington known as Juniper Point. Wind is not a constant resource and based on the site wind measurement data, it is estimated that the Project would generate approximately 7 average annual MWs of electricity. BPA proposes to purchase the electricity generated by the Project. CARES would execute a contractual agreement with a wind developer, to install approximately 91 wind turbines and associated facilities to generate electricity. The Project`s construction and operation would include: install concrete pier foundationsmore » for each wind turbine; install 91 model AWT-26 wind turbines using 43 m high guyed tubular towers on the pier foundations; construct a new 115/24-kv substation; construct a 149 m{sup 2} steel operations and maintenance building; install 25 pad mount transformers along the turbine access roads; install 4.0 km of underground 24 kv power collection lines to collect power from individual turbines to the end of turbine strings; install 1.2 km of underground communication and transmission lines from each turbine to a pad mount transformer; install 5.6 km of 24 kv wood pole transmission lines to deliver electricity from the pad mount transformers to the Project substation; install 3.2 km of 115 kv wood pole transmission lines to deliver electricity from the Project substation to the Public Utility District No. 1 of Klickitat County(PUD)115 kv Goldendale line; interconnect with the BPA transmission system through the Goldendale line and Goldendale substation owned by the PUD; reconstruct, upgrade, and maintain 8.0 km of existing roads; construct and maintain 6.4 km of new graveled roads along the turbine strings and to individual turbines; and install meteorological towers guyed with rebar anchors on the Project site.« less
An integrated decision support system for TRAC: A proposal
NASA Technical Reports Server (NTRS)
Mukkamala, Ravi
1991-01-01
Optimal allocation and usage of resources is a key to effective management. Resources of concern to TRAC are: Manpower (PSY), Money (Travel, contracts), Computing, Data, Models, etc. Management activities of TRAC include: Planning, Programming, Tasking, Monitoring, Updating, and Coordinating. Existing systems are insufficient, not completely automated, manpower intensive, and has the potential for data inconsistency exists. A system is proposed which suggests a means to integrate all project management activities of TRAC through the development of a sophisticated software and by utilizing the existing computing systems and network resources. The systems integration proposal is examined in detail.