Sample records for protection system operating

  1. 40 CFR 267.198 - What are the general operating requirements for my tank systems?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 28 2012-07-01 2012-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...

  2. 40 CFR 267.198 - What are the general operating requirements for my tank systems?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 27 2011-07-01 2011-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...

  3. 40 CFR 267.198 - What are the general operating requirements for my tank systems?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 27 2014-07-01 2014-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...

  4. 40 CFR 267.198 - What are the general operating requirements for my tank systems?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 28 2013-07-01 2013-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...

  5. 40 CFR 267.198 - What are the general operating requirements for my tank systems?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 26 2010-07-01 2010-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...

  6. Control and protection system for paralleled modular static inverter-converter systems

    NASA Technical Reports Server (NTRS)

    Birchenough, A. G.; Gourash, F.

    1973-01-01

    A control and protection system was developed for use with a paralleled 2.5-kWe-per-module static inverter-converter system. The control and protection system senses internal and external fault parameters such as voltage, frequency, current, and paralleling current unbalance. A logic system controls contactors to isolate defective power conditioners or loads. The system sequences contactor operation to automatically control parallel operation, startup, and fault isolation. Transient overload protection and fault checking sequences are included. The operation and performance of a control and protection system, with detailed circuit descriptions, are presented.

  7. 40 CFR 267.201 - What must I do when I stop operating the tank system?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.201 What must I do when I stop operating the tank... 40 Protection of Environment 28 2012-07-01 2012-07-01 false What must I do when I stop operating the tank system? 267.201 Section 267.201 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...

  8. 40 CFR 267.201 - What must I do when I stop operating the tank system?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.201 What must I do when I stop operating the tank... 40 Protection of Environment 28 2013-07-01 2013-07-01 false What must I do when I stop operating the tank system? 267.201 Section 267.201 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...

  9. 40 CFR 267.201 - What must I do when I stop operating the tank system?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.201 What must I do when I stop operating the tank... 40 Protection of Environment 26 2010-07-01 2010-07-01 false What must I do when I stop operating the tank system? 267.201 Section 267.201 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...

  10. 40 CFR 267.201 - What must I do when I stop operating the tank system?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.201 What must I do when I stop operating the tank... 40 Protection of Environment 27 2011-07-01 2011-07-01 false What must I do when I stop operating the tank system? 267.201 Section 267.201 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...

  11. 40 CFR 267.201 - What must I do when I stop operating the tank system?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.201 What must I do when I stop operating the tank... 40 Protection of Environment 27 2014-07-01 2014-07-01 false What must I do when I stop operating the tank system? 267.201 Section 267.201 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...

  12. Operational test report -- Project W-320 cathodic protection systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bowman, T.J.

    1998-06-16

    Washington Administrative Code (WAC) 173-303-640 specifies that corrosion protection must be designed into tank systems that treat or store dangerous wastes. Project W-320, Waste Retrieval Sluicing System (WRSS), utilizes underground encased waste transfer piping between tanks 241-C-106 and 241-AY-102. Corrosion protection is afforded to the encasements of the WRSS waste transfer piping through the application of earthen ionic currents onto the surface of the piping encasements. Cathodic protection is used in conjunction with the protective coatings that are applied upon the WRSS encasement piping. WRSS installed two new two rectifier systems (46 and 47) and modified one rectifier system (31).more » WAC 173-303-640 specifies that the proper operation of cathodic protection systems must be confirmed within six months after initial installation. The WRSS cathodic protection systems were energized to begin continuous operation on 5/5/98. Sixteen days after the initial steady-state start-up of the WRSS rectifier systems, the operational testing was accomplished with procedure OTP-320-006 Rev/Mod A-0. This operational test report documents the OTP-320-006 results and documents the results of configuration testing of integrated piping and rectifier systems associated with the W-320 cathodic protection systems.« less

  13. The influence of protection system failures and preventive maintenance on protection systems in distribution systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meeuwsen, J.J.; Kling, W.L.; Ploem, W.A.G.A.

    1997-01-01

    Protection systems in power systems can fail either by not responding when they should (failure to operate) or by operating when they should not (false tripping). The former type of failure is particularly serious since it may result in the isolation of large sections of the network. However, the probability of a failure to operate can be reduced by carrying out preventive maintenance on protection systems. This paper describes an approach to determine the impact of preventive maintenance on protection systems on the reliability of the power supply to customers. The proposed approach is based on Markov models.

  14. System and method for quench protection of a superconductor

    DOEpatents

    Huang, Xianrui; Sivasubramaniam, Kiruba Haran; Bray, James William; Ryan, David Thomas

    2008-03-11

    A system and method for protecting a superconductor from a quench condition. A quench protection system is provided to protect the superconductor from damage due to a quench condition. The quench protection system comprises a voltage detector operable to detect voltage across the superconductor. The system also comprises a frequency filter coupled to the voltage detector. The frequency filter is operable to couple voltage signals to a control circuit that are representative of a rise in superconductor voltage caused by a quench condition and to block voltage signals that are not. The system is operable to detect whether a quench condition exists in the superconductor based on the voltage signal received via the frequency filter and to initiate a protective action in response.

  15. Objects Architecture: A Comprehensive Design Approach for Real-Time, Distributed, Fault-Tolerant, Reactive Operating Systems.

    DTIC Science & Technology

    1987-09-01

    real - time operating system should be efficient from the real-time point...5,8]) system naming scheme. 3.2 Protecting Objects Real-time embedded systems usually neglect protection mechanisms. However, a real - time operating system cannot...allocation mechanism should adhere to application constraints. This strong relationship between a real - time operating system and the application

  16. 75 FR 16676 - Airworthiness Standards; Electrical and Electronic System Lightning Protection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... systems that allow them to operate into instrument meteorological conditions (IMC), where lightning... 27 standards that operate in VFR-only operations with electrical or electronic systems installed for... Airworthiness Standards; Electrical and Electronic System Lightning Protection AGENCY: Federal Aviation...

  17. 40 CFR 280.31 - Operation and maintenance of corrosion protection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Operation and maintenance of corrosion... UNDERGROUND STORAGE TANKS (UST) General Operating Requirements § 280.31 Operation and maintenance of corrosion protection. All owners and operators of steel UST systems with corrosion protection must comply with the...

  18. 40 CFR 280.31 - Operation and maintenance of corrosion protection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Operation and maintenance of corrosion... UNDERGROUND STORAGE TANKS (UST) General Operating Requirements § 280.31 Operation and maintenance of corrosion protection. All owners and operators of steel UST systems with corrosion protection must comply with the...

  19. 40 CFR 280.31 - Operation and maintenance of corrosion protection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Operation and maintenance of corrosion... UNDERGROUND STORAGE TANKS (UST) General Operating Requirements § 280.31 Operation and maintenance of corrosion protection. All owners and operators of steel UST systems with corrosion protection must comply with the...

  20. 40 CFR 62.15220 - What additional requirements must I meet for the operation of my continuous emission monitoring...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? 62.15220 Section 62.15220 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... the operation of my continuous emission monitoring systems and continuous opacity monitoring system...

  1. 40 CFR 62.15220 - What additional requirements must I meet for the operation of my continuous emission monitoring...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? 62.15220 Section 62.15220 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... the operation of my continuous emission monitoring systems and continuous opacity monitoring system...

  2. Encryption protection for communication satellites

    NASA Astrophysics Data System (ADS)

    Sood, D. R.; Hoernig, O. W., Jr.

    In connection with the growing importance of the commercial communication satellite systems and the introduction of new technological developments, users and operators of these systems become increasingly concerned with aspects of security. The user community is concerned with maintaining confidentiality and integrity of the information being transmitted over the satellite links, while the satellite operators are concerned about the safety of their assets in space. In response to these concerns, the commercial satellite operators are now taking steps to protect the communication information and the satellites. Thus, communication information is being protected by end-to-end encryption of the customer communication traffic. Attention is given to the selection of the NBS DES algorithm, the command protection systems, and the communication protection systems.

  3. Development of a Communication System Compatible with Chemical Protective Clothing and Equipment.

    DTIC Science & Technology

    1986-06-23

    for the Chemical Protective Clothing Communication System are discussed in the operation manuals for the engineering prototypes of the trans- ceiver...Report Date DEVELOPMENT OF A COMMUNICATION SYSTEM COMPATIBLE June 1986 WITH CHEMICAL PROTECTIVE CLOTHING AND EQUIPMENT 6. Performing Organization Code 8...Abstract - ’The U. S. Coast Guard and NASA joined in a project to develop a cominications system to operate inside protective suits used in chemical spill

  4. 40 CFR 60.753 - Operational standards for collection and control systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... such that all collected gases are vented to a control system designed and operated in compliance with... and control systems. 60.753 Section 60.753 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Performance for Municipal Solid Waste Landfills § 60.753 Operational standards for collection and control...

  5. 40 CFR 60.753 - Operational standards for collection and control systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... such that all collected gases are vented to a control system designed and operated in compliance with... and control systems. 60.753 Section 60.753 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Performance for Municipal Solid Waste Landfills § 60.753 Operational standards for collection and control...

  6. 40 CFR 60.753 - Operational standards for collection and control systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... such that all collected gases are vented to a control system designed and operated in compliance with... and control systems. 60.753 Section 60.753 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Performance for Municipal Solid Waste Landfills § 60.753 Operational standards for collection and control...

  7. 40 CFR 141.804 - Aircraft water system operations and maintenance plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Aircraft water system operations and maintenance plan. 141.804 Section 141.804 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Aircraft Drinking Water Rule § 141.804 Aircraft water system...

  8. Analytical Approaches for Identification and Representation of Critical Protection Systems in Transient Stability Studies

    NASA Astrophysics Data System (ADS)

    Hedman, Mojdeh Khorsand

    After a major disturbance, the power system response is highly dependent on protection schemes and system dynamics. Improving power systems situational awareness requires proper and simultaneous modeling of both protection schemes and dynamic characteristics in power systems analysis tools. Historical information and ex-post analysis of blackouts reaffirm the critical role of protective devices in cascading events, thereby confirming the necessity to represent protective functions in transient stability studies. This dissertation is aimed at studying the importance of representing protective relays in power system dynamic studies. Although modeling all of the protective relays within transient stability studies may result in a better estimation of system behavior, representing, updating, and maintaining the protection system data becomes an insurmountable task. Inappropriate or outdated representation of the relays may result in incorrect assessment of the system behavior. This dissertation presents a systematic method to determine essential relays to be modeled in transient stability studies. The desired approach should identify protective relays that are critical for various operating conditions and contingencies. The results of the transient stability studies confirm that modeling only the identified critical protective relays is sufficient to capture system behavior for various operating conditions and precludes the need to model all of the protective relays. Moreover, this dissertation proposes a method that can be implemented to determine the appropriate location of out-of-step blocking relays. During unstable power swings, a generator or group of generators may accelerate or decelerate leading to voltage depression at the electrical center along with generator tripping. This voltage depression may cause protective relay mis-operation and unintentional separation of the system. In order to avoid unintentional islanding, the potentially mis-operating relays should be blocked from tripping with the use of out-of-step blocking schemes. Blocking these mis-operating relays, combined with an appropriate islanding scheme, help avoid a system wide collapse. The proposed method is tested on data from the Western Electricity Coordinating Council. A triple line outage of the California-Oregon Intertie is studied. The results show that the proposed method is able to successfully identify proper locations of out-of-step blocking scheme.

  9. Design and performance evaluation of collision protection-based safety operation for a haptic robot-assisted catheter operating system.

    PubMed

    Zhang, Linshuai; Guo, Shuxiang; Yu, Huadong; Song, Yu; Tamiya, Takashi; Hirata, Hideyuki; Ishihara, Hidenori

    2018-02-23

    The robot-assisted catheter system can increase operating distance thus preventing the exposure radiation of the surgeon to X-ray for endovascular catheterization. However, few designs have considered the collision protection between the catheter tip and the vessel wall. This paper presents a novel catheter operating system based on tissue protection to prevent vessel puncture caused by collision. The integrated haptic interface not only allows the operator to feel the real force feedback, but also combines with the newly proposed collision protection mechanism (CPM) to mitigate the collision trauma. The CPM can release the catheter quickly when the measured force exceeds a certain threshold, so as to avoid the vessel puncture. A significant advantage is that the proposed mechanism can adjust the protection threshold in real time by the current according to the actual characteristics of the blood vessel. To verify the effectiveness of the tissue protection by the system, the evaluation experiments in vitro were carried out. The results show that the further collision damage can be effectively prevented by the CPM, which implies the realization of relative safe catheterization. This research provides some insights into the functional improvements of safe and reliable robot-assisted catheter systems.

  10. Safety Analysis and Protection Measures of the Control System of the Pulsed High Magnetic Field Facility in WHMFC

    NASA Astrophysics Data System (ADS)

    Shi, J. T.; Han, X. T.; Xie, J. F.; Yao, L.; Huang, L. T.; Li, L.

    2013-03-01

    A Pulsed High Magnetic Field Facility (PHMFF) has been established in Wuhan National High Magnetic Field Center (WHMFC) and various protection measures are applied in its control system. In order to improve the reliability and robustness of the control system, the safety analysis of the PHMFF is carried out based on Fault Tree Analysis (FTA) technique. The function and realization of 5 protection systems, which include sequence experiment operation system, safety assistant system, emergency stop system, fault detecting and processing system and accident isolating protection system, are given. The tests and operation indicate that these measures improve the safety of the facility and ensure the safety of people.

  11. Minutes of the Rapid Action Fire Protection System Seminar Held at Rock Island, Illinois on 23-24 October 1984

    DTIC Science & Technology

    1984-10-01

    A\\5AI5?? 93<» MINUTES OF THE RAPID ACTION FIRE PROTECTION SYSTEM SEMINAR AMCCOM SAFETY OFFICE 23-24 OCTOBER 1984 PREFACE This seminar was...held as a medium by which there could be a free exchange of information on rapid action fire protection systems used in munition production operations...The objectives of the seminar were- - Discuss system operating principles & system components. - Exchange latest technical data, developments, and

  12. 40 CFR 280.31 - Operation and maintenance of corrosion protection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... protection. All owners and operators of steel UST systems with corrosion protection must comply with the... according to another reasonable time frame established by the implementing agency; and (2) Inspection...

  13. 40 CFR 280.31 - Operation and maintenance of corrosion protection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... protection. All owners and operators of steel UST systems with corrosion protection must comply with the... according to another reasonable time frame established by the implementing agency; and (2) Inspection...

  14. 40 CFR 60.1765 - What additional requirements must I meet for the operation of my continuous emission monitoring...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? 60.1765 Section 60.1765 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... continuous emission monitoring systems and continuous opacity monitoring system? Use the required span values...

  15. 40 CFR 60.1765 - What additional requirements must I meet for the operation of my continuous emission monitoring...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? 60.1765 Section 60.1765 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... continuous emission monitoring systems and continuous opacity monitoring system? Use the required span values...

  16. 46 CFR 58.25-55 - Overcurrent protection for steering-gear systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Steering Gear § 58.25-55 Overcurrent protection... machinery-control station if there is an overload that would cause overheating of the motor. (d) No control... operated by power, is not operated by electric power or is operated by an electric motor primarily intended...

  17. 46 CFR 58.25-55 - Overcurrent protection for steering-gear systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Steering Gear § 58.25-55 Overcurrent protection... machinery-control station if there is an overload that would cause overheating of the motor. (d) No control... operated by power, is not operated by electric power or is operated by an electric motor primarily intended...

  18. 40 CFR Table 2 to Subpart Oooo of... - Operating Limits if Using Add-On Control Devices and Capture System

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... to Subpart OOOO of Part 63—Operating Limits if Using Add-On Control Devices and Capture System If you... 40 Protection of Environment 13 2014-07-01 2014-07-01 false Operating Limits if Using Add-On Control Devices and Capture System 2 Table 2 to Subpart OOOO of Part 63 Protection of Environment...

  19. 40 CFR Table 1 to Subpart Jjjj of... - Operating Limits if Using Add-On Control Devices and Capture System

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...—Operating Limits if Using Add-On Control Devices and Capture System If you are required to comply with... 40 Protection of Environment 13 2014-07-01 2014-07-01 false Operating Limits if Using Add-On Control Devices and Capture System 1 Table 1 to Subpart JJJJ of Part 63 Protection of Environment...

  20. 40 CFR Table 1 to Subpart Ssss of... - Operating Limits if Using Add-on Control Devices and Capture System

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...—Operating Limits if Using Add-on Control Devices and Capture System If you are required to comply with... 40 Protection of Environment 13 2014-07-01 2014-07-01 false Operating Limits if Using Add-on Control Devices and Capture System 1 Table 1 to Subpart SSSS of Part 63 Protection of Environment...

  1. 40 CFR Table 1 to Subpart Jjjj of... - Operating Limits if Using Add-On Control Devices and Capture System

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Limits if Using Add-On Control Devices and Capture System If you are required to comply with operating... 40 Protection of Environment 12 2011-07-01 2009-07-01 true Operating Limits if Using Add-On Control Devices and Capture System 1 Table 1 to Subpart JJJJ of Part 63 Protection of Environment...

  2. 40 CFR Table 1 to Subpart Jjjj of... - Operating Limits if Using Add-On Control Devices and Capture System

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...—Operating Limits if Using Add-On Control Devices and Capture System If you are required to comply with... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Operating Limits if Using Add-On Control Devices and Capture System 1 Table 1 to Subpart JJJJ of Part 63 Protection of Environment...

  3. 40 CFR Table 2 to Subpart Oooo of... - Operating Limits if Using Add-On Control Devices and Capture System

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... to Subpart OOOO of Part 63—Operating Limits if Using Add-On Control Devices and Capture System If you... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Operating Limits if Using Add-On Control Devices and Capture System 2 Table 2 to Subpart OOOO of Part 63 Protection of Environment...

  4. 40 CFR Table 1 to Subpart Ssss of... - Operating Limits if Using Add-on Control Devices and Capture System

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...—Operating Limits if Using Add-on Control Devices and Capture System If you are required to comply with... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Operating Limits if Using Add-on Control Devices and Capture System 1 Table 1 to Subpart SSSS of Part 63 Protection of Environment...

  5. 40 CFR Table 2 to Subpart Oooo of... - Operating Limits if Using Add-On Control Devices and Capture System

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... to Subpart OOOO of Part 63—Operating Limits if Using Add-On Control Devices and Capture System If you... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Operating Limits if Using Add-On Control Devices and Capture System 2 Table 2 to Subpart OOOO of Part 63 Protection of Environment...

  6. 40 CFR Table 2 to Subpart Oooo of... - Operating Limits if Using Add-On Control Devices and Capture System

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OOOO of Part 63—Operating Limits if Using Add-On Control Devices and Capture System If you are required... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Operating Limits if Using Add-On Control Devices and Capture System 2 Table 2 to Subpart OOOO of Part 63 Protection of Environment...

  7. 40 CFR Table 1 to Subpart Ssss of... - Operating Limits if Using Add-on Control Devices and Capture System

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...—Operating Limits if Using Add-on Control Devices and Capture System If you are required to comply with... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Operating Limits if Using Add-on Control Devices and Capture System 1 Table 1 to Subpart SSSS of Part 63 Protection of Environment...

  8. 40 CFR Table 1 to Subpart Ssss of... - Operating Limits if Using Add-on Control Devices and Capture System

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Using Add-on Control Devices and Capture System If you are required to comply with operating limits by... 40 Protection of Environment 12 2011-07-01 2009-07-01 true Operating Limits if Using Add-on Control Devices and Capture System 1 Table 1 to Subpart SSSS of Part 63 Protection of Environment...

  9. 40 CFR Table 2 to Subpart Oooo of... - Operating Limits if Using Add-On Control Devices and Capture System

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OOOO of Part 63—Operating Limits if Using Add-On Control Devices and Capture System If you are required... 40 Protection of Environment 12 2011-07-01 2009-07-01 true Operating Limits if Using Add-On Control Devices and Capture System 2 Table 2 to Subpart OOOO of Part 63 Protection of Environment...

  10. 40 CFR Table 1 to Subpart Ssss of... - Operating Limits if Using Add-on Control Devices and Capture System

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Using Add-on Control Devices and Capture System If you are required to comply with operating limits by... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Operating Limits if Using Add-on Control Devices and Capture System 1 Table 1 to Subpart SSSS of Part 63 Protection of Environment...

  11. 40 CFR Table 1 to Subpart Jjjj of... - Operating Limits if Using Add-On Control Devices and Capture System

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...—Operating Limits if Using Add-On Control Devices and Capture System If you are required to comply with... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Operating Limits if Using Add-On Control Devices and Capture System 1 Table 1 to Subpart JJJJ of Part 63 Protection of Environment...

  12. 40 CFR Table 1 to Subpart Jjjj of... - Operating Limits if Using Add-On Control Devices and Capture System

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Limits if Using Add-On Control Devices and Capture System If you are required to comply with operating... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Operating Limits if Using Add-On Control Devices and Capture System 1 Table 1 to Subpart JJJJ of Part 63 Protection of Environment...

  13. Halon Gas and Library Fire Protection.

    ERIC Educational Resources Information Center

    Pacey, Antony

    1991-01-01

    Describes the operation of halon gas fire extinguishing systems, which have been installed in a number of libraries and archives across Canada where protection of special collections from water and mold damage resulting from operation of a standard water sprinkler system is paramount. The advantages and disadvantages of this type of system are…

  14. A novel plant protection strategy for transient reactors

    NASA Astrophysics Data System (ADS)

    Bhattacharyya, Samit K.; Lipinski, Walter C.; Hanan, Nelson A.

    A novel plant protection system designed for use in the TREAT Upgrade (TU) reactor is described. The TU reactor is designed for controlled transient operation in the testing of reactor fuel behavior under simulated reactor accident conditions. Safe operation of the reactor is of paramount importance and the Plant Protection System (PPS) had to be designed to exacting requirements. Researchers believe that the strategy developed for the TU has potential application to the multimegawatt space reactors and represents the state of the art in terrestrial transient reactor protection systems.

  15. Stream protection with small cable yarding systems

    Treesearch

    Penn A. Peters; Chris B. LeDoux

    1984-01-01

    Small cable yarder systems that can be purchased and operated by independent logging contractors have less potential negative impact on water quality than ground-based systems operating on steep terrain because they do not require such an intense road system. Stream protection costs were estimated at $3.78 per lineal foot of stream when a typical small yarder (Koller K...

  16. Mobile detection assessment and response systems (MDARS): a force protection physical security operational success

    NASA Astrophysics Data System (ADS)

    Shoop, Brian; Johnston, Michael; Goehring, Richard; Moneyhun, Jon; Skibba, Brian

    2006-05-01

    MDARS is a Semi-autonomous unmanned ground vehicle with intrusion detection & assessment, product & barrier assessment payloads. Its functions include surveillance, security, early warning, incident first response and product and barrier status primarily focused on a depot/munitions security mission at structured/semi-structured facilities. MDARS is in Systems Development and Demonstration (SDD) under the Product Manager for Force Protection Systems (PM-FPS). MDARS capabilities include semi-autonomous navigation, obstacle avoidance, motion detection, day and night imagers, radio frequency tag inventory/barrier assessment and audio challenge and response. Four SDD MDARS Patrol Vehicles have been undergoing operational evaluation at Hawthorne Army Depot, NV (HWAD) since October 2004. Hawthorne personnel were trained to administer, operate and maintain the system in accordance with the US Army Military Police School (USAMPS) Concept of Employment and the PM-FPS MDARS Integrated Logistic Support Plan. The system was subjected to intensive periods of evaluation under the guidance and control of the Army Test and Evaluation Center (ATEC) and PM-FPS. Significantly, in terms of User acceptance, the system has been under the "operational control" of the installation performing security and force protection missions in support of daily operations. This evaluation is intended to assess MDARS operational effectiveness in an operational environment. Initial observations show that MDARS provides enhanced force protection, can potentially reduce manpower requirements by conducting routine tasks within its design capabilities and reduces Soldier exposure in the initial response to emerging incidents and situations. Success of the MDARS program has been instrumental in the design and development of two additional robotic force protection programs. The first was the USAF Force Protection Battle Lab sponsored Remote Detection Challenge & Response (REDCAR) concept demonstration executed by the Air Force Robotics Lab (AFRL). The REDCAR used an MDARS PUV as the central robotic technology and expanded the concept to incorporate a smaller high speed platform (SCOUT) equipped with lethal, non-lethal and challenge components as an engagement platform and, in a marsupial configuration on the MDARS, a small UGV that can be deployed to investigate close quarters areas. The Family of Integrated Rapid Response Equipment (FIRRE) program further expands these concepts by incorporating and adapting other mobile/tactical force protection equipment with a more robust Unmanned Ground Vehicle into an "Expeditionary" configuration to provide the current force with a rapidly deployable force protection system that can operate in austere less structured and protected environments. A USAMPS/ MANCEN sponsored "FIRRE System Demonstration" in Iraq is scheduled to begin in FY '07.

  17. Effect of switching off unidirectional downflow systems of operating theaters during prolonged inactivity on the period before the operating theater can safely be used.

    PubMed

    Traversari, A A L; Bottenheft, C; van Heumen, S P M; Goedhart, C A; Vos, M C

    2017-02-01

    Switching off air handling systems in operating theaters during periods of prolonged inactivity (eg, nights, weekends) can produce a substantial reduction of energy expenditure. However, little evidence is available regarding the effect of switching off the air handling system during periods of prolonged inactivity on the air quality in operating theaters during operational periods. The aim of this study is to determine the amount of time needed after restarting the ventilation system to return to a stable situation, with air quality at least equal to the situation before switching off the system. Measurements were performed in 3 operating theaters, all of them equipped with a unidirectional downflow (UDF) system. Measurements (particle counts of emitted particles with a particle size ≥0.5 µm) were taken during the start-up of the ventilation system to determine when prespecified degrees of protection were achieved. Temperature readings were taken to determine when a stable temperature difference between the periphery and the protected area was reached, signifying achievement of a stable condition. After starting up the system, the protected area achieved the required degrees of protection within 20 minutes (95% upper confidence limit). A stable temperature difference was achieved within 23 minutes (95% upper confidence limit). Both findings lie well within the period of 25 minutes normally required for preparations before the start of surgical procedures. Switching off the ventilation system during prolonged inactivity (during the night and weekend) has no negative effect on the air quality in UDF operating theaters during normal operational hours. Copyright © 2017 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Elsevier Inc. All rights reserved.

  18. Method and Apparatus Providing Deception and/or Altered Operation in an Information System Operating System

    DOEpatents

    Cohen, Fred; Rogers, Deanna T.; Neagoe, Vicentiu

    2008-10-14

    A method and/or system and/or apparatus providing deception and/or execution alteration in an information system. In specific embodiments, deceptions and/or protections are provided by intercepting and/or modifying operation of one or more system calls of an operating system.

  19. System and method for quench and over-current protection of superconductor

    DOEpatents

    Huang, Xianrui; Laskaris, Evangelos Trifon; Sivasubramaniam, Kiruba Haran; Bray, James William; Ryan, David Thomas; Fogarty, James Michael; Steinbach, Albert Eugene

    2005-05-31

    A system and method for protecting a superconductor. The system may comprise a current sensor operable to detect a current flowing through the superconductor. The system may comprise a coolant temperature sensor operable to detect the temperature of a cryogenic coolant used to cool the superconductor to a superconductive state. The control circuit is operable to estimate the superconductor temperature based on the current flow and the coolant temperature. The system may also be operable to compare the estimated superconductor temperature to at least one threshold temperature and to initiate a corrective action when the superconductor temperature exceeds the at least one threshold temperature.

  20. The upgraded data acquisition system for beam loss monitoring at the Fermilab Tevatron and Main Injector

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baumbaugh, A.; Briegel, C.; Brown, B.C.

    2011-11-01

    A VME-based data acquisition system for beam-loss monitors has been developed and is in use in the Tevatron and Main Injector accelerators at the Fermilab complex. The need for enhanced beam-loss protection when the Tevatron is operating in collider-mode was the main driving force for the new design. Prior to the implementation of the present system, the beam-loss monitor system was disabled during collider operation and protection of the Tevatron magnets relied on the quench protection system. The new Beam-Loss Monitor system allows appropriate abort logic and thresholds to be set over the full set of collider operating conditions. Themore » system also records a history of beam-loss data prior to a beam-abort event for post-abort analysis. Installation of the Main Injector system occurred in the fall of 2006 and the Tevatron system in the summer of 2007. Both systems were fully operation by the summer of 2008. In this paper we report on the overall system design, provide a description of its normal operation, and show a number of examples of its use in both the Main Injector and Tevatron.« less

  1. The upgraded data acquisition system for beam loss monitoring at the Fermilab Tevatron and Main Injector

    NASA Astrophysics Data System (ADS)

    Baumbaugh, A.; Briegel, C.; Brown, B. C.; Capista, D.; Drennan, C.; Fellenz, B.; Knickerbocker, K.; Lewis, J. D.; Marchionni, A.; Needles, C.; Olson, M.; Pordes, S.; Shi, Z.; Still, D.; Thurman-Keup, R.; Utes, M.; Wu, J.

    2011-11-01

    A VME-based data acquisition system for beam-loss monitors has been developed and is in use in the Tevatron and Main Injector accelerators at the Fermilab complex. The need for enhanced beam-loss protection when the Tevatron is operating in collider-mode was the main driving force for the new design. Prior to the implementation of the present system, the beam-loss monitor system was disabled during collider operation and protection of the Tevatron magnets relied on the quench protection system. The new Beam-Loss Monitor system allows appropriate abort logic and thresholds to be set over the full set of collider operating conditions. The system also records a history of beam-loss data prior to a beam-abort event for post-abort analysis. Installation of the Main Injector system occurred in the fall of 2006 and the Tevatron system in the summer of 2007. Both systems were fully operation by the summer of 2008. In this paper we report on the overall system design, provide a description of its normal operation, and show a number of examples of its use in both the Main Injector and Tevatron.

  2. 40 CFR 265.1201 - Design and operating standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Design and operating standards. 265.1201 Section 265.1201 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID...) Provide monitoring and inspection procedures that assure the controls and containment systems are working...

  3. 40 CFR 1700.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Definitions. 1700.3 Section 1700.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY AND DEPARTMENT OF DEFENSE; UNIFORM NATIONAL... operation of a marine propulsion system, shipboard maneuvering system, crew habitability system, or...

  4. 40 CFR 1700.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 33 2011-07-01 2011-07-01 false Definitions. 1700.3 Section 1700.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY AND DEPARTMENT OF DEFENSE; UNIFORM NATIONAL... operation of a marine propulsion system, shipboard maneuvering system, crew habitability system, or...

  5. 40 CFR 1700.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Definitions. 1700.3 Section 1700.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY AND DEPARTMENT OF DEFENSE; UNIFORM NATIONAL... operation of a marine propulsion system, shipboard maneuvering system, crew habitability system, or...

  6. 40 CFR 1700.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 34 2013-07-01 2013-07-01 false Definitions. 1700.3 Section 1700.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY AND DEPARTMENT OF DEFENSE; UNIFORM NATIONAL... operation of a marine propulsion system, shipboard maneuvering system, crew habitability system, or...

  7. 40 CFR 1700.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Definitions. 1700.3 Section 1700.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY AND DEPARTMENT OF DEFENSE; UNIFORM NATIONAL... operation of a marine propulsion system, shipboard maneuvering system, crew habitability system, or...

  8. 40 CFR 264.194 - General operating requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....194 Section 264.194 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Tank Systems § 264.194 General operating requirements. (a) Hazardous wastes or treatment reagents must...

  9. 46 CFR 76.35-15 - Operation and installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so arranged and installed that the presence of a fire may be reported from any of the protected spaces and be...

  10. 46 CFR 76.35-15 - Operation and installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so arranged and installed that the presence of a fire may be reported from any of the protected spaces and be...

  11. 46 CFR 76.35-15 - Operation and installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so arranged and installed that the presence of a fire may be reported from any of the protected spaces and be...

  12. 46 CFR 76.35-15 - Operation and installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so arranged and installed that the presence of a fire may be reported from any of the protected spaces and be...

  13. 40 CFR 264.1201 - Design and operating standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Design and operating standards. 264.1201 Section 264.1201 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... inspection procedures that assure the controls and containment systems are working as designed and that...

  14. A slotted cathodic protection system for bridge decks.

    DOT National Transportation Integrated Search

    1985-01-01

    A non-overlay, slotted cathodic protection system was installed two years ago on a concrete bridge deck in Virginia. The design, installation, and operation of this system are fairly straightforward. A protective current density of 1.6 mA/ft (17 mA...

  15. A continuous operating protection system called COPS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chaperon, G.

    1987-01-01

    The continuous operating protection system called COPS is a diverless solution to achieve the stabilization and protection of subsea pipelines and cables: the system is based on the use of a continuous fabric form work mattress which is spread on the sea bed over the pipeline or cable to be protected by a remotely controlled underwater crawler and simultaneously filled with cement grout. The method has been successfully used in the GULLFAKS field where about 3.6 km of grout mattresses having a cross section of 2 meters by 0.2 meters have been laid. The performances of the system are presentedmore » as well as a trade off comparison with the other stabilization and protection methods currently used: burying, rock dumping or placement of covers.« less

  16. Groundwater monitoring system

    DOEpatents

    Ames, Kenneth R.; Doesburg, James M.; Eschbach, Eugene A.; Kelley, Roy C.; Myers, David A.

    1987-01-01

    A groundwater monitoring system includes a bore, a well casing within and spaced from the bore, and a pump within the casing. A water impermeable seal between the bore and the well casing prevents surface contamination from entering the pump. Above the ground surface is a removable operating means which is connected to the pump piston by a flexible cord. A protective casing extends above ground and has a removable cover. After a groundwater sample has been taken, the cord is disconnected from the operating means. The operating means is removed for taking away, the cord is placed within the protective casing, and the cover closed and locked. The system is thus protected from contamination, as well as from damage by accident or vandalism.

  17. The Effects of the Reverse Current Caused by the Series Compensation on the Current Differential Protection

    PubMed Central

    Tang, Cui; Yin, Xianggen; Qi, Xuanwei; Zhang, Zhe

    2014-01-01

    The series capacitor compensation is one of the key technologies in the EHV and UHV long distance power transmission lines. This paper analyzes the operation characteristics of the main protection combined with the engineering practice when the transmission line overcompensation due to the series compensation system is modified and analyzes the influence of the transition resistance and the system operation mode on the current differential protection. According to the simulation results, it presents countermeasure on improving the sensitivity of differential current protection. PMID:25247206

  18. Superconducting Magnet Power Supply and Hard-Wired Quench Protection at Jefferson Lab for 12 GeV Upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ghoshal, Probir K.; Bachimanchi, Ramakrishna; Fair, Ruben J.

    The superconducting magnet system in Hall B being designed and built as part of the Jefferson Lab 12 GeV upgrade requires powering two conduction cooled superconducting magnets - a torus and a solenoid. The torus magnet is designed to operate at 3770 A and solenoid at 2416 A. Failure Modes and Effects Analysis (FMEA) determined that voltage level thresholds and dump switch operation for magnet protection should be tested and analyzed before incorporation into the system. The designs of the quench protection and voltage tap sub-systems were driven by the requirement to use a primary hard-wired quench detection sub-system togethermore » with a secondary PLC-based protection. Parallel path voltage taps feed both the primary and secondary quench protection sub-systems. The PLC based secondary protection is deployed as a backup for the hard-wired quench detection sub-system and also acts directly on the dump switch. Here, we describe a series of tests and modifications carried out on the magnet power supply and quench protection system to ensure that the superconducting magnet is protected for all fault scenarios.« less

  19. Superconducting Magnet Power Supply and Hard-Wired Quench Protection at Jefferson Lab for 12 GeV Upgrade

    DOE PAGES

    Ghoshal, Probir K.; Bachimanchi, Ramakrishna; Fair, Ruben J.; ...

    2017-10-05

    The superconducting magnet system in Hall B being designed and built as part of the Jefferson Lab 12 GeV upgrade requires powering two conduction cooled superconducting magnets - a torus and a solenoid. The torus magnet is designed to operate at 3770 A and solenoid at 2416 A. Failure Modes and Effects Analysis (FMEA) determined that voltage level thresholds and dump switch operation for magnet protection should be tested and analyzed before incorporation into the system. The designs of the quench protection and voltage tap sub-systems were driven by the requirement to use a primary hard-wired quench detection sub-system togethermore » with a secondary PLC-based protection. Parallel path voltage taps feed both the primary and secondary quench protection sub-systems. The PLC based secondary protection is deployed as a backup for the hard-wired quench detection sub-system and also acts directly on the dump switch. Here, we describe a series of tests and modifications carried out on the magnet power supply and quench protection system to ensure that the superconducting magnet is protected for all fault scenarios.« less

  20. Kestrel: force protection and Intelligence, Surveillance, and Reconnaissance (ISR) persistent surveillance on aerostats

    NASA Astrophysics Data System (ADS)

    Luber, David R.; Marion, John E.; Fields, David

    2012-05-01

    Logos Technologies has developed and fielded the Kestrel system, an aerostat-based, wide area persistent surveillance system dedicated to force protection and ISR mission execution operating over forward operating bases. Its development included novel imaging and stabilization capability for day/night operations on military aerostat systems. The Kestrel system's contribution is a substantial enhancement to aerostat-based, force protection systems which to date have relied on narrow field of view ball gimbal sensors to identify targets of interest. This inefficient mechanism to conduct wide area field of view surveillance is greatly enhanced by Kestrel's ability to maintain a constant motion imagery stare of the entire forward operating base (FOB) area. The Kestrel airborne sensor enables 360° coverage out to extended ranges which covers a city sized area at moderate resolution, while cueing a narrow field of view sensor to provide high resolution imagery of targets of interest. The ground station exploitation system enables operators to autonomously monitor multiple regions of interest in real time, and allows for backtracking through the recorded imagery, while continuing to monitor ongoing activity. Backtracking capability allows operators to detect threat networks, their CONOPS, and locations of interest. Kestrel's unique advancement has already been utilized successfully in OEF operations.

  1. The Effect of Power Protection Equipment on Explosion Hazards and on the Reliability of Power Supply to Longwall Systems

    NASA Astrophysics Data System (ADS)

    Boron, Sergiusz

    2017-06-01

    Operational safety of electrical machines and equipment depends, inter alia, on the hazards resulting from their use and on the scope of applied protective measures. The use of insufficient protection against existing hazards leads to reduced operational safety, particularly under fault conditions. On the other hand, excessive (in relation to existing hazards) level of protection may compromise the reliability of power supply. This paper analyses the explosion hazard created by earth faults in longwall power supply systems and evaluates existing protection equipment from the viewpoint of its protective performance, particularly in the context of explosion hazards, and also assesses its effect on the reliability of power supply.

  2. A prospective case control comparison of the ZeroGravity system versus a standard lead apron as radiation protection strategy in neuroendovascular procedures.

    PubMed

    Haussen, Diogo C; Van Der Bom, Imramsjah Martijn John; Nogueira, Raul G

    2016-10-01

    We aimed to compare the performance of the ZeroGravity (ZG) system (radiation protection system composed by a suspended lead suit) against the use of standard protection (lead apron (LA), thyroid shield, lead eyeglasses, table skirts, and ceiling suspended shield) in neuroangiography procedures. Radiation exposure data were prospectively collected in consecutive neuroendovascular procedures between December 2014 and February 2015. Operator No 1 was assigned to the use of an LA (plus lead glasses, thyroid shield, and a 1 mm hanging shield at the groin) while operator No 2 utilized the ZG system. Dosimeters were used to measure peak skin dose for the head, thyroid, and left foot. The two operators performed a total of 122 procedures during the study period. The ZG operator was more commonly the primary operator compared with the LA operator (85% vs 71%; p=0.04). The mean anterior-posterior (AP), lateral, and cumulative dose area product (DAP) radiation exposure as well as the mean fluoroscopy time were not statistically different between the operators' cases. The peak skin dose to the head of the operator with LA was 2.1 times higher (3380 vs 1600 μSv), while the thyroid was 13.9 (4460 vs 320 μSv), the mediastinum infinitely (520 vs 0 μSv), and the foot 3.3 times higher (4870 vs 1470 μSv) compared with the ZG operator, leading to an overall accumulated dose 4 times higher. The ratio of cumulative operator received dose/total cumulative DAP was 2.5 higher on the LA operator. The ZG radiation protection system leads to substantially lower radiation exposure to the operator in neurointerventional procedures. However, substantial exposure may still occur at the level of the lens and thyroid to justify additional protection. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  3. 46 CFR 108.443 - Controls and valves.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... valves. (a) At least one control for operating a CO2 system must be outside the space or spaces that the... also in the protected space. (b) A CO2 system that protects more than one space must have a manifold... protected space. (c) A CO2 system that protects only one space must have a stop valve installed between the...

  4. Joint force protection advanced security system (JFPASS) "the future of force protection: integrate and automate"

    NASA Astrophysics Data System (ADS)

    Lama, Carlos E.; Fagan, Joe E.

    2009-09-01

    The United States Department of Defense (DoD) defines 'force protection' as "preventive measures taken to mitigate hostile actions against DoD personnel (to include family members), resources, facilities, and critical information." Advanced technologies enable significant improvements in automating and distributing situation awareness, optimizing operator time, and improving sustainability, which enhance protection and lower costs. The JFPASS Joint Capability Technology Demonstration (JCTD) demonstrates a force protection environment that combines physical security and Chemical, Biological, Radiological, Nuclear, and Explosive (CBRNE) defense through the application of integrated command and control and data fusion. The JFPASS JCTD provides a layered approach to force protection by integrating traditional sensors used in physical security, such as video cameras, battlefield surveillance radars, unmanned and unattended ground sensors. The optimization of human participation and automation of processes is achieved by employment of unmanned ground vehicles, along with remotely operated lethal and less-than-lethal weapon systems. These capabilities are integrated via a tailorable, user-defined common operational picture display through a data fusion engine operating in the background. The combined systems automate the screening of alarms, manage the information displays, and provide assessment and response measures. The data fusion engine links disparate sensors and systems, and applies tailored logic to focus the assessment of events. It enables timely responses by providing the user with automated and semi-automated decision support tools. The JFPASS JCTD uses standard communication/data exchange protocols, which allow the system to incorporate future sensor technologies or communication networks, while maintaining the ability to communicate with legacy or existing systems.

  5. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 13 2011-07-01 2011-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  6. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 14 2012-07-01 2011-07-01 true What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  7. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 14 2014-07-01 2014-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  8. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 13 2010-07-01 2010-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  9. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 14 2013-07-01 2013-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  10. 14 CFR 25.21 - Proof of compliance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... augmentation system or upon any other automatic or power-operated system, compliance must be shown with §§ 25... appendix C, assuming normal operation of the airplane and its ice protection system in accordance with the operating limitations and operating procedures established by the applicant and provided in the Airplane...

  11. 14 CFR 25.21 - Proof of compliance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... augmentation system or upon any other automatic or power-operated system, compliance must be shown with §§ 25... appendix C, assuming normal operation of the airplane and its ice protection system in accordance with the operating limitations and operating procedures established by the applicant and provided in the Airplane...

  12. 14 CFR 25.21 - Proof of compliance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... augmentation system or upon any other automatic or power-operated system, compliance must be shown with §§ 25..., assuming normal operation of the airplane and its ice protection system in accordance with the operating limitations and operating procedures established by the applicant and provided in the Airplane Flight Manual...

  13. 14 CFR 25.21 - Proof of compliance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... augmentation system or upon any other automatic or power-operated system, compliance must be shown with §§ 25..., assuming normal operation of the airplane and its ice protection system in accordance with the operating limitations and operating procedures established by the applicant and provided in the Airplane Flight Manual...

  14. Layered virus protection for the operations and administrative messaging system

    NASA Technical Reports Server (NTRS)

    Cortez, R. H.

    2002-01-01

    NASA's Deep Space Network (DSN) is critical in supporting the wide variety of operating and plannedunmanned flight projects. For day-to-day operations it relies on email communication between the three Deep Space Communication Complexes (Canberra, Goldstone, Madrid) and NASA's Jet Propulsion Laboratory. The Operations & Administrative Messaging system, based on the Microsoft Windows NTand Exchange platform, provides the infrastructure that is required for reliable, mission-critical messaging. The reliability of this system, however, is threatened by the proliferation of email viruses that continue to spread at alarming rates. A layered approach to email security has been implemented across the DSN to protect against this threat.

  15. Illustration of distributed generation effects on protection system coordination

    NASA Astrophysics Data System (ADS)

    Alawami, Hussain Adnan

    Environmental concerns, market forces, and emergence of new technologies have recently resulted in restructuring electric utility from vertically integrated networks to competitive deregulated entities. Distributed generation (DG) is playing a major role in such deregulated markets. When they are installed in small amounts and small sizes, their impacts on the system may be negligible. When their penetration levels increase as well as their sizes, however, they may start affecting the system performance from more than one aspect. Power system protection needs to be re-assessed after the emergence of DG. This thesis attempts to illustrate the impact of DG on the power system protection coordination. It will study the operation of the impedance relays, fuses, reclosers and overcurrent relays when a DG is added to the distribution network. Different DG sizes, distances from the network and locations within the distribution system will be considered. Power system protection coordination is very sensitive to the DG size where it is not for the DG distance. DG location has direct impact on the operation of the protective devices especially when it is inserted in the middle point of the distribution system. Key Words, Distributed Generation, Impedance relay, fuses, reclosers, overcurrent relays, power system protection coordination.

  16. Protection of Hardware: Powering Systems (Power Converter, Normal Conducting, and Superconducting Magnets)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pfeffer, H.; Flora, B.; Wolff, D.

    2016-01-01

    Along with the protection of magnets and power converters, we have added a section on personnel protection because this is our highest priority in the design and operation of power systems. Thus, our topics are the protection of people, power converters, and magnet loads (protected from the powering equipment), including normal conducting magnets and superconducting magnets.

  17. 40 CFR 63.444 - Standards for the pulping system at sulfite processes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards for the pulping system at sulfite processes. (a) The owner or operator of each sulfite process... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Standards for the pulping system at sulfite processes. 63.444 Section 63.444 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...

  18. 40 CFR 258.26 - Run-on/run-off control systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Run-on/run-off control systems. 258.26 Section 258.26 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Operating Criteria § 258.26 Run-on/run-off control systems. (a...

  19. 40 CFR 258.26 - Run-on/run-off control systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Run-on/run-off control systems. 258.26 Section 258.26 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Operating Criteria § 258.26 Run-on/run-off control systems. (a...

  20. 10 CFR 60.131 - General design criteria for the geologic repository operations area.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... operating systems, including alarm systems, important to safety. (g) Inspection, testing, and maintenance... radioactivity areas; and (6) A radiation alarm system to warn of significant increases in radiation levels... system shall be designed with provisions for calibration and for testing its operability. (b) Protection...

  1. 40 CFR 60.1730 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emission monitoring systems are operating correctly? 60.1730 Section 60.1730 Protection of Environment... continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or carbon dioxide...

  2. 40 CFR 60.1730 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... emission monitoring systems are operating correctly? 60.1730 Section 60.1730 Protection of Environment... continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or carbon dioxide...

  3. 40 CFR 62.15185 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emission monitoring systems are operating correctly? 62.15185 Section 62.15185 Protection of Environment... make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or...

  4. 40 CFR 60.2940 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... emission monitoring systems are operating correctly? 60.2940 Section 60.2940 Protection of Environment... monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b) Complete your...

  5. 10 CFR 60.131 - General design criteria for the geologic repository operations area.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... operating systems, including alarm systems, important to safety. (g) Inspection, testing, and maintenance... radioactivity areas; and (6) A radiation alarm system to warn of significant increases in radiation levels... system shall be designed with provisions for calibration and for testing its operability. (b) Protection...

  6. 10 CFR 60.131 - General design criteria for the geologic repository operations area.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... operating systems, including alarm systems, important to safety. (g) Inspection, testing, and maintenance... radioactivity areas; and (6) A radiation alarm system to warn of significant increases in radiation levels... system shall be designed with provisions for calibration and for testing its operability. (b) Protection...

  7. 40 CFR 60.3039 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... emission monitoring systems are operating correctly? 60.3039 Section 60.3039 Protection of Environment... emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b...

  8. 40 CFR 60.1730 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... emission monitoring systems are operating correctly? 60.1730 Section 60.1730 Protection of Environment... continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or carbon dioxide...

  9. 40 CFR 60.2940 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emission monitoring systems are operating correctly? 60.2940 Section 60.2940 Protection of Environment... monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b) Complete your...

  10. 40 CFR 60.2940 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... emission monitoring systems are operating correctly? 60.2940 Section 60.2940 Protection of Environment... monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b) Complete your...

  11. 40 CFR 60.1730 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... emission monitoring systems are operating correctly? 60.1730 Section 60.1730 Protection of Environment... continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or carbon dioxide...

  12. 40 CFR 60.3039 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... emission monitoring systems are operating correctly? 60.3039 Section 60.3039 Protection of Environment... emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b...

  13. 40 CFR 62.15185 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... emission monitoring systems are operating correctly? 62.15185 Section 62.15185 Protection of Environment... make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or...

  14. 40 CFR 60.3039 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... emission monitoring systems are operating correctly? 60.3039 Section 60.3039 Protection of Environment... emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b...

  15. 40 CFR 60.3039 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emission monitoring systems are operating correctly? 60.3039 Section 60.3039 Protection of Environment... emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b...

  16. 40 CFR 60.1730 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... emission monitoring systems are operating correctly? 60.1730 Section 60.1730 Protection of Environment... continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or carbon dioxide...

  17. 40 CFR 62.15185 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... emission monitoring systems are operating correctly? 62.15185 Section 62.15185 Protection of Environment... make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or...

  18. 40 CFR 60.3039 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... emission monitoring systems are operating correctly? 60.3039 Section 60.3039 Protection of Environment... emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b...

  19. 40 CFR 62.15185 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... emission monitoring systems are operating correctly? 62.15185 Section 62.15185 Protection of Environment... make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or...

  20. 40 CFR 62.15185 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... emission monitoring systems are operating correctly? 62.15185 Section 62.15185 Protection of Environment... make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or...

  1. 10 CFR 60.131 - General design criteria for the geologic repository operations area.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... operating systems, including alarm systems, important to safety. (g) Inspection, testing, and maintenance... radioactivity areas; and (6) A radiation alarm system to warn of significant increases in radiation levels... system shall be designed with provisions for calibration and for testing its operability. (b) Protection...

  2. 30 CFR 56.14130 - Roll-over protective structures (ROPS) and seat belts.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Mining Machines,”, 1986; or (2) SAE J1194, “Roll-Over Protective Structures (ROPS) for Wheeled... when operating graders from a standing position, the grader operator shall wear safety lines and a... meet the requirement of SAE J386, “Operator Restraint System for Off-Road Work Machines” (1985, 1993...

  3. 30 CFR 56.14130 - Roll-over protective structures (ROPS) and seat belts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Mining Machines,”, 1986; or (2) SAE J1194, “Roll-Over Protective Structures (ROPS) for Wheeled... when operating graders from a standing position, the grader operator shall wear safety lines and a... meet the requirement of SAE J386, “Operator Restraint System for Off-Road Work Machines” (1985, 1993...

  4. 30 CFR 56.14130 - Roll-over protective structures (ROPS) and seat belts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mining Machines,”, 1986; or (2) SAE J1194, “Roll-Over Protective Structures (ROPS) for Wheeled... when operating graders from a standing position, the grader operator shall wear safety lines and a... meet the requirement of SAE J386, “Operator Restraint System for Off-Road Work Machines” (1985, 1993...

  5. 30 CFR 56.14130 - Roll-over protective structures (ROPS) and seat belts.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Mining Machines,”, 1986; or (2) SAE J1194, “Roll-Over Protective Structures (ROPS) for Wheeled... when operating graders from a standing position, the grader operator shall wear safety lines and a... meet the requirement of SAE J386, “Operator Restraint System for Off-Road Work Machines” (1985, 1993...

  6. 30 CFR 56.14130 - Roll-over protective structures (ROPS) and seat belts.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Mining Machines,”, 1986; or (2) SAE J1194, “Roll-Over Protective Structures (ROPS) for Wheeled... when operating graders from a standing position, the grader operator shall wear safety lines and a... meet the requirement of SAE J386, “Operator Restraint System for Off-Road Work Machines” (1985, 1993...

  7. 40 CFR 141.626 - Operational evaluation levels.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 141.626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141... operations, excess storage capacity, distribution system flushing, changes in sources or source water quality...

  8. Application of Advanced Wide Area Early Warning Systems with Adaptive Protection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blumstein, Carl; Cibulka, Lloyd; Thorp, James

    2014-09-30

    Recent blackouts of power systems in North America and throughout the world have shown how critical a reliable power system is to modern societies, and the enormous economic and societal damage a blackout can cause. It has been noted that unanticipated operation of protection systems can contribute to cascading phenomena and, ultimately, blackouts. This project developed and field-tested two methods of Adaptive Protection systems utilizing synchrophasor data. One method detects conditions of system stress that can lead to unintended relay operation, and initiates a supervisory signal to modify relay response in real time to avoid false trips. The second methodmore » detects the possibility of false trips of impedance relays as stable system swings “encroach” on the relays’ impedance zones, and produces an early warning so that relay engineers can re-evaluate relay settings. In addition, real-time synchrophasor data produced by this project was used to develop advanced visualization techniques for display of synchrophasor data to utility operators and engineers.« less

  9. 40 CFR 1033.112 - Emission diagnostics for SCR systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Emission diagnostics for SCR systems. 1033.112 Section 1033.112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... computer memory all incidents of engine operation with inadequate reductant injection or reductant quality...

  10. 46 CFR 111.97-9 - Overcurrent protection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...

  11. 46 CFR 111.97-9 - Overcurrent protection.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...

  12. 46 CFR 111.97-9 - Overcurrent protection.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...

  13. 46 CFR 111.97-9 - Overcurrent protection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...

  14. 14 CFR 25.21 - Proof of compliance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... characteristics requirements is dependent upon a stability augmentation system or upon any other automatic or power-operated system, compliance must be shown with §§ 25.671 and 25.672. (f) In meeting the... ice protection system in accordance with the operating limitations and operating procedures...

  15. Operations and Maintenance, Part of Indoor Air Quailty Design Tools for Schools

    EPA Pesticide Factsheets

    Effective operation and maintenance procedures are fundamentally important to protect the investment in, and performance of, all building systems. Student health and productivity can suffer when building systems fail to operate as designed.

  16. 46 CFR 27.101 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY UNINSPECTED VESSELS TOWING VESSELS General Provisions for Fire-Protection... the Commandant; (2) A manually-operated clean-agent system that satisfies the National Fire Protection... or coastal service. Towing vessel in ocean or coastal service means a towing vessel that operates...

  17. 40 CFR 91.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... designed primarily for operation on land and secondarily for operation in water. Auxiliary emission control..., system, or element of design which controls or reduces the emission of substances from an engine. Engine... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF...

  18. 40 CFR 91.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... designed primarily for operation on land and secondarily for operation in water. Auxiliary emission control..., system, or element of design which controls or reduces the emission of substances from an engine. Engine... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF...

  19. 40 CFR 91.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... designed primarily for operation on land and secondarily for operation in water. Auxiliary emission control..., system, or element of design which controls or reduces the emission of substances from an engine. Engine... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF...

  20. 40 CFR 91.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... designed primarily for operation on land and secondarily for operation in water. Auxiliary emission control..., system, or element of design which controls or reduces the emission of substances from an engine. Engine... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF...

  1. 40 CFR 265.228 - Closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Section 265.228 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... or operator must: (1) Remove or decontaminate all waste residues, contaminated containment system...

  2. Power quality and protection of electric distribution systems with small, dispersed generation devices

    NASA Astrophysics Data System (ADS)

    Rizy, D. T.; Jewell, W. T.

    1984-10-01

    There are several operational problems associated with the connection of small power sources, such as wind turbines and photovoltaic (PV) arrays, to an electric distribution system. In one study the harmonic distortion produced by a subdivision of PV arrays connected through line-commutated inverters was simulated. A second simulation study evaluated protection problems associated with the operation of dispersed ac generators. The purpose of these studies was to examine the adequacy of the electric utility industry's traditional practices and hardware for the operation of dispersed power sources. The results of these simulation studies are discussed and recommendations are given for hardware and system operation needed for accommodating this new technology.

  3. 40 CFR 60.434 - Monitoring of operations and recordkeeping.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... recordkeeping. 60.434 Section 60.434 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... affected facility using waterborne ink systems or solvent-borne ink systems with solvent recovery systems...) If affected facilities share the same raw ink storage/handling system with existing facilities...

  4. 40 CFR 60.434 - Monitoring of operations and recordkeeping.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... recordkeeping. 60.434 Section 60.434 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... affected facility using waterborne ink systems or solvent-borne ink systems with solvent recovery systems...) If affected facilities share the same raw ink storage/handling system with existing facilities...

  5. 30 CFR 57.14130 - Roll-over protective structures (ROPS) and seat belts for surface equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Protective Structures (ROPS) for Construction, Earthmoving, Forestry, and Mining Machines,”, 1986; or (2) SAE... operating graders from a standing position, the grader operator shall wear safety lines and a harness in... requirement of SAE J386, “Operator Restraint System for Off-Road Work Machines” (1985, 1993, or 1997), or SAE...

  6. 30 CFR 57.14130 - Roll-over protective structures (ROPS) and seat belts for surface equipment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Protective Structures (ROPS) for Construction, Earthmoving, Forestry, and Mining Machines,”, 1986; or (2) SAE... operating graders from a standing position, the grader operator shall wear safety lines and a harness in... requirement of SAE J386, “Operator Restraint System for Off-Road Work Machines” (1985, 1993, or 1997), or SAE...

  7. 30 CFR 57.14130 - Roll-over protective structures (ROPS) and seat belts for surface equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Protective Structures (ROPS) for Construction, Earthmoving, Forestry, and Mining Machines,”, 1986; or (2) SAE... operating graders from a standing position, the grader operator shall wear safety lines and a harness in... requirement of SAE J386, “Operator Restraint System for Off-Road Work Machines” (1985, 1993, or 1997), or SAE...

  8. 30 CFR 57.14130 - Roll-over protective structures (ROPS) and seat belts for surface equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Protective Structures (ROPS) for Construction, Earthmoving, Forestry, and Mining Machines,”, 1986; or (2) SAE... operating graders from a standing position, the grader operator shall wear safety lines and a harness in... requirement of SAE J386, “Operator Restraint System for Off-Road Work Machines” (1985, 1993, or 1997), or SAE...

  9. 30 CFR 57.14130 - Roll-over protective structures (ROPS) and seat belts for surface equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Protective Structures (ROPS) for Construction, Earthmoving, Forestry, and Mining Machines,”, 1986; or (2) SAE... operating graders from a standing position, the grader operator shall wear safety lines and a harness in... requirement of SAE J386, “Operator Restraint System for Off-Road Work Machines” (1985, 1993, or 1997), or SAE...

  10. 40 CFR 280.73 - Applicability to previously closed UST systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.73 Applicability to previously closed UST systems. When directed by the implementing agency, the owner and operator of an UST system... systems. 280.73 Section 280.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID...

  11. 40 CFR 280.73 - Applicability to previously closed UST systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.73 Applicability to previously closed UST systems. When directed by the implementing agency, the owner and operator of an UST system... systems. 280.73 Section 280.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID...

  12. 40 CFR 280.73 - Applicability to previously closed UST systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.73 Applicability to previously closed UST systems. When directed by the implementing agency, the owner and operator of an UST system... systems. 280.73 Section 280.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID...

  13. 40 CFR 280.73 - Applicability to previously closed UST systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.73 Applicability to previously closed UST systems. When directed by the implementing agency, the owner and operator of an UST system... systems. 280.73 Section 280.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID...

  14. 40 CFR 280.73 - Applicability to previously closed UST systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.73 Applicability to previously closed UST systems. When directed by the implementing agency, the owner and operator of an UST system... systems. 280.73 Section 280.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID...

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clements, Abraham Anthony

    EPOXY is a LLVM base compiler that applies security protections to bare-metal programs on ARM Cortex-M series micro-controllers. This includes privilege overlaying, wherein operations requiring privileged execution are identified and only these operations execute in privileged mode. It also applies code integrity, control-flow hijacking defenses, stack protections, and fine-grained randomization schemes. All of its protections work within the constraints of bare-metal systems.

  16. 47 CFR 27.1134 - Protection of Federal Government operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....1134 Section 27.1134 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES 1710-1755 MHz, 2110-2155 MHz, 2000-2020 MHz, and... Defense (DoD) operates communications systems in the 1710-1755 MHz band at 16 protected facilities...

  17. 40 CFR 60.2095 - What site-specific documentation is required?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (5) Procedures for operating the incinerator and associated air pollution control systems within the... incinerator operating limits. (7) Reporting and recordkeeping procedures. (8) The waste management plan... required? 60.2095 Section 60.2095 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR...

  18. Comparison of three distinct surgical clothing systems for protection from air-borne bacteria: A prospective observational study

    PubMed Central

    2012-01-01

    Background To prevent surgical site infection it is desirable to keep bacterial counts low in the operating room air during orthopaedic surgery, especially prosthetic surgery. As the air-borne bacteria are mainly derived from the skin flora of the personnel present in the operating room a reduction could be achieved by using a clothing system for staff made from a material fulfilling the requirements in the standard EN 13795. The aim of this study was to compare the protective capacity between three clothing systems made of different materials – one mixed cotton/polyester and two polyesters - which all had passed the tests according to EN 13795. Methods Measuring of CFU/m3 air was performed during 21 orthopaedic procedures performed in four operating rooms with turbulent, mixing ventilation with air flows of 755 – 1,050 L/s. All staff in the operating room wore clothes made from the same material during each surgical procedure. Results The source strength (mean value of CFU emitted from one person per second) calculated for the three garments were 4.1, 2.4 and 0.6 respectively. In an operating room with an air flow of 755 L/s both clothing systems made of polyester reduced the amount of CFU/m3 significantly compared to the clothing system made from mixed material. In an operating room with air intake of 1,050 L/s a significant reduction was only achieved with the polyester that had the lowest source strength. Conclusions Polyester has a better protective capacity than cotton/polyester. There is need for more discriminating tests of the protective efficacy of textile materials intended to use for operating garment. PMID:23068884

  19. 40 CFR 267.199 - What inspection requirements must I meet?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... cathodic protection systems, if present, according to, at a minimum, the following schedule to ensure that they are functioning properly: (1) Confirm that the cathodic protection system is operating properly... 40 Protection of Environment 27 2011-07-01 2011-07-01 false What inspection requirements must I...

  20. 40 CFR 267.199 - What inspection requirements must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... cathodic protection systems, if present, according to, at a minimum, the following schedule to ensure that they are functioning properly: (1) Confirm that the cathodic protection system is operating properly... 40 Protection of Environment 26 2010-07-01 2010-07-01 false What inspection requirements must I...

  1. 40 CFR 141.804 - Aircraft water system operations and maintenance plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... calendar quarter of initial operation of the aircraft. (e) Any changes to the aircraft water system... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Aircraft water system operations and...) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Aircraft Drinking Water Rule...

  2. 40 CFR 141.804 - Aircraft water system operations and maintenance plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... calendar quarter of initial operation of the aircraft. (e) Any changes to the aircraft water system... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Aircraft water system operations and...) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Aircraft Drinking Water Rule...

  3. 40 CFR 60.2939 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... systems must I install? 60.2939 Section 60.2939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... and Qualification Monitoring § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon...

  4. 76 FR 23171 - Electric Reliability Organization Interpretations of Interconnection Reliability Operations and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-26

    ... (MW and MVAR), or system configuration to maintain system stability, acceptable voltage or power flows... identified system conditions to prevent system instability or cascading outages, and protect other facilities... instability, cascading outages, and protect other facilities in response to contingencies. Therefore, a...

  5. 40 CFR Table 1 to Subpart IIIi of... - Operating Limits for Capture Systems and Add-On Control Devices

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Operating Limits for Capture Systems... 63—Operating Limits for Capture Systems and Add-On Control Devices If you are required to comply with operating limits by § 63.3093, you must comply with the applicable operating limits in the following table...

  6. 40 CFR Table 1 to Subpart IIIi of... - Operating Limits for Capture Systems and Add-On Control Devices

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true Operating Limits for Capture Systems... 63—Operating Limits for Capture Systems and Add-On Control Devices If you are required to comply with operating limits by § 63.3093, you must comply with the applicable operating limits in the following table...

  7. 40 CFR Table 1 to Subpart IIIi of... - Operating Limits for Capture Systems and Add-On Control Devices

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Operating Limits for Capture Systems... Subpart IIII of Part 63—Operating Limits for Capture Systems and Add-On Control Devices If you are required to comply with operating limits by § 63.3093, you must comply with the applicable operating limits...

  8. 40 CFR Table 1 to Subpart IIIi of... - Operating Limits for Capture Systems and Add-On Control Devices

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Operating Limits for Capture Systems... Subpart IIII of Part 63—Operating Limits for Capture Systems and Add-On Control Devices If you are required to comply with operating limits by § 63.3093, you must comply with the applicable operating limits...

  9. 40 CFR Table 1 to Subpart IIIi of... - Operating Limits for Capture Systems and Add-On Control Devices

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 13 2014-07-01 2014-07-01 false Operating Limits for Capture Systems... Subpart IIII of Part 63—Operating Limits for Capture Systems and Add-On Control Devices If you are required to comply with operating limits by § 63.3093, you must comply with the applicable operating limits...

  10. Respiratory protective device design using control system techniques

    NASA Technical Reports Server (NTRS)

    Burgess, W. A.; Yankovich, D.

    1972-01-01

    The feasibility of a control system analysis approach to provide a design base for respiratory protective devices is considered. A system design approach requires that all functions and components of the system be mathematically identified in a model of the RPD. The mathematical notations describe the operation of the components as closely as possible. The individual component mathematical descriptions are then combined to describe the complete RPD. Finally, analysis of the mathematical notation by control system theory is used to derive compensating component values that force the system to operate in a stable and predictable manner.

  11. 46 CFR 111.97-9 - Overcurrent protection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection. Overcurrent devices must be arranged to isolate a fault with as little disruption of the system as possible...

  12. A Study of the Effects of Altitude on Thermal Ice Protection System Performance

    NASA Technical Reports Server (NTRS)

    Addy, Gene; Oleskiw, Myron; Broeren, Andy P.; Orchard, David

    2013-01-01

    Thermal ice protection systems use heat energy to prevent a dangerous buildup of ice on an aircraft. As aircraft become more efficient, less heat energy is available to operate a thermal ice protections system. This requires that thermal ice protection systems be designed to more exacting standards so as to more efficiently prevent a dangerous ice buildup without adversely affecting aircraft safety. While the effects of altitude have always beeing taked into account in the design of thermal ice protection systems, a better understanding of these effects is needed so as to enable more exact design, testing, and evaluation of these systems.

  13. Staged-Fault Testing of Distance Protection Relay Settings

    NASA Astrophysics Data System (ADS)

    Havelka, J.; Malarić, R.; Frlan, K.

    2012-01-01

    In order to analyze the operation of the protection system during induced fault testing in the Croatian power system, a simulation using the CAPE software has been performed. The CAPE software (Computer-Aided Protection Engineering) is expert software intended primarily for relay protection engineers, which calculates current and voltage values during faults in the power system, so that relay protection devices can be properly set up. Once the accuracy of the simulation model had been confirmed, a series of simulations were performed in order to obtain the optimal fault location to test the protection system. The simulation results were used to specify the test sequence definitions for the end-to-end relay testing using advanced testing equipment with GPS synchronization for secondary injection in protection schemes based on communication. The objective of the end-to-end testing was to perform field validation of the protection settings, including verification of the circuit breaker operation, telecommunication channel time and the effectiveness of the relay algorithms. Once the end-to-end secondary injection testing had been completed, the induced fault testing was performed with three-end lines loaded and in service. This paper describes and analyses the test procedure, consisting of CAPE simulations, end-to-end test with advanced secondary equipment and staged-fault test of a three-end power line in the Croatian transmission system.

  14. Wavelet Based Protection Scheme for Multi Terminal Transmission System with PV and Wind Generation

    NASA Astrophysics Data System (ADS)

    Manju Sree, Y.; Goli, Ravi kumar; Ramaiah, V.

    2017-08-01

    A hybrid generation is a part of large power system in which number of sources usually attached to a power electronic converter and loads are clustered can operate independent of the main power system. The protection scheme is crucial against faults based on traditional over current protection since there are adequate problems due to fault currents in the mode of operation. This paper adopts a new approach for detection, discrimination of the faults for multi terminal transmission line protection in presence of hybrid generation. Transient current based protection scheme is developed with discrete wavelet transform. Fault indices of all phase currents at all terminals are obtained by analyzing the detail coefficients of current signals using bior 1.5 mother wavelet. This scheme is tested for different types of faults and is found effective for detection and discrimination of fault with various fault inception angle and fault impedance.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    X. Zhao, S. Ramakrishnan, J. Lawson, C.Neumeyer, R. Marsala, H. Schneider, Engineering Operations

    NSTX at Princeton Plasma Physics Laboratory (PPPL) requires sophisticated plasma positioning control system for stable plasma operation. TF magnetic coils and PF magnetic coils provide electromagnetic fields to position and shape the plasma vertically and horizontally respectively. NSTX utilizes twenty six coil power supplies to establish and initiate electromagnetic fields through the coil system for plasma control. A power protection and interlock system is utilized to detect power system faults and protect the TF coils and PF coils against excessive electromechanical forces, overheating, and over current. Upon detecting any fault condition the power system is restricted, and it is eithermore » prevented from initializing or suppressed to de-energize coil power during pulsing. Power fault status is immediately reported to the computer system. This paper describes the design and operation of NSTX's protection and interlocking system and possible future expansion.« less

  16. 40 CFR 63.4361 - How do I determine the emission capture system efficiency?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... from the web coating/printing operation surfaces they are applied to occurs within the capture system... system efficiency? 63.4361 Section 63.4361 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... emission capture system efficiency? You must use the procedures and test methods in this section to...

  17. 40 CFR 60.2939 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... systems must I install? 60.2939 Section 60.2939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon monoxide and for oxygen. You must...

  18. 40 CFR 60.2939 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... systems must I install? 60.2939 Section 60.2939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon monoxide and for oxygen. You must...

  19. Computer network defense system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Urias, Vincent; Stout, William M. S.; Loverro, Caleb

    A method and apparatus for protecting virtual machines. A computer system creates a copy of a group of the virtual machines in an operating network in a deception network to form a group of cloned virtual machines in the deception network when the group of the virtual machines is accessed by an adversary. The computer system creates an emulation of components from the operating network in the deception network. The components are accessible by the group of the cloned virtual machines as if the group of the cloned virtual machines was in the operating network. The computer system moves networkmore » connections for the group of the virtual machines in the operating network used by the adversary from the group of the virtual machines in the operating network to the group of the cloned virtual machines, enabling protecting the group of the virtual machines from actions performed by the adversary.« less

  20. 40 CFR 122.32 - As an operator of a small MS4, am I regulated under the NPDES storm water program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false As an operator of a small MS4, am I regulated under the NPDES storm water program? 122.32 Section 122.32 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM Permit...

  1. 40 CFR 122.32 - As an operator of a small MS4, am I regulated under the NPDES storm water program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false As an operator of a small MS4, am I regulated under the NPDES storm water program? 122.32 Section 122.32 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM Permit...

  2. The near infrared imaging system for the real-time protection of the JET ITER-like wall

    NASA Astrophysics Data System (ADS)

    Huber, A.; Kinna, D.; Huber, V.; Arnoux, G.; Balboa, I.; Balorin, C.; Carman, P.; Carvalho, P.; Collins, S.; Conway, N.; McCullen, P.; Jachmich, S.; Jouve, M.; Linsmeier, Ch; Lomanowski, B.; Lomas, P. J.; Lowry, C. G.; Maggi, C. F.; Matthews, G. F.; May-Smith, T.; Meigs, A.; Mertens, Ph; Nunes, I.; Price, M.; Puglia, P.; Riccardo, V.; Rimini, F. G.; Sergienko, G.; Tsalas, M.; Zastrow, K.-D.; contributors, JET

    2017-12-01

    This paper describes the design, implementation and operation of the near infrared (NIR) imaging diagnostic system of the JET ITER-like wall (JET-ILW) plasma experiment and its integration into the existing JET protection architecture. The imaging system comprises four wide-angle views, four tangential divertor views, and two top views of the divertor covering 66% of the first wall and up to 43% of the divertor. The operation temperature ranges which must be observed by the NIR protection cameras are, for the materials used on JET: Be 700 °C-1400 °C W coating 700 °C-1370 °C W bulk 700 °C-1400 °C. The Real-Time Protection system operates routinely since 2011 and successfully demonstrated its capability to avoid the overheating of the main chamber beryllium wall as well as of the divertor W and W-coated carbon fibre composite (CFC) tiles. During this period, less than 0.5% of the terminated discharges were aborted by a malfunction of the system. About 2%-3% of the discharges were terminated due to the detection of actual hot spots.

  3. 40 CFR 63.1085 - What are the general requirements for heat exchange systems?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... heat exchange systems? 63.1085 Section 63.1085 Protection of Environment ENVIRONMENTAL PROTECTION... Exchange Systems and Waste Operations Heat Exchange System Requirements § 63.1085 What are the general requirements for heat exchange systems? Unless you meet one of the requirements for exemptions in § 63.1084...

  4. 40 CFR 63.1085 - What are the general requirements for heat exchange systems?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... heat exchange systems? 63.1085 Section 63.1085 Protection of Environment ENVIRONMENTAL PROTECTION... Exchange Systems and Waste Operations Heat Exchange System Requirements § 63.1085 What are the general requirements for heat exchange systems? Unless you meet one of the requirements for exemptions in § 63.1084...

  5. 40 CFR 63.1085 - What are the general requirements for heat exchange systems?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... heat exchange systems? 63.1085 Section 63.1085 Protection of Environment ENVIRONMENTAL PROTECTION... Exchange Systems and Waste Operations Heat Exchange System Requirements § 63.1085 What are the general requirements for heat exchange systems? Unless you meet one of the requirements for exemptions in § 63.1084...

  6. 40 CFR 63.1085 - What are the general requirements for heat exchange systems?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... heat exchange systems? 63.1085 Section 63.1085 Protection of Environment ENVIRONMENTAL PROTECTION... Exchange Systems and Waste Operations Heat Exchange System Requirements § 63.1085 What are the general requirements for heat exchange systems? Unless you meet one of the requirements for exemptions in § 63.1084...

  7. Novel Directional Protection Scheme for the FREEDM Smart Grid System

    NASA Astrophysics Data System (ADS)

    Sharma, Nitish

    This research primarily deals with the design and validation of the protection system for a large scale meshed distribution system. The large scale system simulation (LSSS) is a system level PSCAD model which is used to validate component models for different time-scale platforms, to provide a virtual testing platform for the Future Renewable Electric Energy Delivery and Management (FREEDM) system. It is also used to validate the cases of power system protection, renewable energy integration and storage, and load profiles. The protection of the FREEDM system against any abnormal condition is one of the important tasks. The addition of distributed generation and power electronic based solid state transformer adds to the complexity of the protection. The FREEDM loop system has a fault current limiter and in addition, the Solid State Transformer (SST) limits the fault current at 2.0 per unit. Former students at ASU have developed the protection scheme using fiber-optic cable. However, during the NSF-FREEDM site visit, the National Science Foundation (NSF) team regarded the system incompatible for the long distances. Hence, a new protection scheme with a wireless scheme is presented in this thesis. The use of wireless communication is extended to protect the large scale meshed distributed generation from any fault. The trip signal generated by the pilot protection system is used to trigger the FID (fault isolation device) which is an electronic circuit breaker operation (switched off/opening the FIDs). The trip signal must be received and accepted by the SST, and it must block the SST operation immediately. A comprehensive protection system for the large scale meshed distribution system has been developed in PSCAD with the ability to quickly detect the faults. The validation of the protection system is performed by building a hardware model using commercial relays at the ASU power laboratory.

  8. Protection against hostile algorithms in UNIX software

    NASA Astrophysics Data System (ADS)

    Radatti, Peter V.

    1996-03-01

    Protection against hostile algorithms contained in Unix software is a growing concern without easy answers. Traditional methods used against similar attacks in other operating system environments such as MS-DOS or Macintosh are insufficient in the more complex environment provided by Unix. Additionally, Unix provides a special and significant problem in this regard due to its open and heterogeneous nature. These problems are expected to become both more common and pronounced as 32 bit multiprocess network operating systems become popular. Therefore, the problems experienced today are a good indicator of the problems and the solutions that will be experienced in the future, no matter which operating system becomes predominate.

  9. 40 CFR 761.65 - Storage for disposal.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... conditions: (i) The waste is placed in a pile designed and operated to control dispersal of the waste by wind...) A run-on control system designed, constructed, operated, and maintained such that: (1) It prevents... 761.65 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL...

  10. 40 CFR 761.65 - Storage for disposal.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... conditions: (i) The waste is placed in a pile designed and operated to control dispersal of the waste by wind...) A run-on control system designed, constructed, operated, and maintained such that: (1) It prevents... 761.65 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL...

  11. 40 CFR 35.929-2 - General requirements for all user charge systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false General requirements for all user charge systems. 35.929-2 Section 35.929-2 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... than every 2 years the waste water contribution of users and user classes, the total costs of operation...

  12. 40 CFR 35.929-2 - General requirements for all user charge systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false General requirements for all user charge systems. 35.929-2 Section 35.929-2 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... than every 2 years the waste water contribution of users and user classes, the total costs of operation...

  13. 40 CFR 35.929-2 - General requirements for all user charge systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false General requirements for all user charge systems. 35.929-2 Section 35.929-2 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... than every 2 years the waste water contribution of users and user classes, the total costs of operation...

  14. 14 CFR 121.321 - Operations in icing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... (1) The airplane must be equipped with a certificated primary airframe ice detection system. (i) The airframe ice protection system must be activated automatically, or manually by the flightcrew, when the primary ice detection system indicates activation is necessary. (ii) When the airframe ice protection...

  15. The DISCUS Hardware System,

    DTIC Science & Technology

    1982-07-01

    blocks. DISCUS has no form of hardware synchronisation between the processors. The only synchronisation is at an operating system level. ;ach processor is... operations in global store so that semaphoring on global objects can be done correctly. Write Protect is used by the operating system for read-only...the appropriate operating system program. String Handling primitives . The Z8000 has a rich set of string primitives . However as we saw before if a

  16. 40 CFR 60.1240 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emission monitoring systems are operating correctly? 60.1240 Section 60.1240 Protection of Environment... Continuous Emission Monitoring § 60.1240 How do I make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous...

  17. 40 CFR 60.2940 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... emission monitoring systems are operating correctly? 60.2940 Section 60.2940 Protection of Environment... 16, 2006 Monitoring § 60.2940 How do I make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous...

  18. 40 CFR 60.1240 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... emission monitoring systems are operating correctly? 60.1240 Section 60.1240 Protection of Environment... Continuous Emission Monitoring § 60.1240 How do I make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous...

  19. 40 CFR 60.2940 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... emission monitoring systems are operating correctly? 60.2940 Section 60.2940 Protection of Environment... 16, 2006 Monitoring § 60.2940 How do I make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous...

  20. 40 CFR 60.1240 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... emission monitoring systems are operating correctly? 60.1240 Section 60.1240 Protection of Environment... Continuous Emission Monitoring § 60.1240 How do I make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous...

  1. 40 CFR 60.1240 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... emission monitoring systems are operating correctly? 60.1240 Section 60.1240 Protection of Environment... Continuous Emission Monitoring § 60.1240 How do I make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous...

  2. 40 CFR 60.1240 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... emission monitoring systems are operating correctly? 60.1240 Section 60.1240 Protection of Environment... Continuous Emission Monitoring § 60.1240 How do I make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous...

  3. 42 CFR 51.21 - Contracts for program operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... and Priorities § 51.21 Contracts for program operations. (a) An eligible P&A system should work... individuals. (b) An eligible P&A system may contract for the operation of all or part of its program with... capacity to perform protection and advocacy activities throughout the State; (2) The eligible P&A system...

  4. A near infra-red video system as a protective diagnostic for electron cyclotron resonance heating operation in the Wendelstein 7-X stellarator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Preynas, M.; Laqua, H. P.; Marsen, S.

    The Wendelstein 7-X stellarator is a large nuclear fusion device based at Max-Planck-Institut für Plasmaphysik in Greifswald in Germany. The main plasma heating system for steady state operation in W7-X is electron cyclotron resonance heating (ECRH). During operation, part of plama facing components will be directly heated by the non-absorbed power of 1 MW rf beams of ECRH. In order to avoid damages of such components made of graphite tiles during the first operational phase, a near infra-red video system has been developed as a protective diagnostic for safe and secure ECRH operation. Both the mechanical design housing the cameramore » and the optical system are very flexible and respect the requirements of steady state operation. The full system including data acquisition and control system has been successfully tested in the vacuum vessel, including on-line visualization and data storage of the four cameras equipping the ECRH equatorial launchers of W7-X.« less

  5. FIRRE command and control station (C2)

    NASA Astrophysics Data System (ADS)

    Laird, R. T.; Kramer, T. A.; Cruickshanks, J. R.; Curd, K. M.; Thomas, K. M.; Moneyhun, J.

    2006-05-01

    The Family of Integrated Rapid Response Equipment (FIRRE) is an advanced technology demonstration program intended to develop a family of affordable, scalable, modular, and logistically supportable unmanned systems to meet urgent operational force protection needs and requirements worldwide. The near-term goal is to provide the best available unmanned ground systems to the warfighter in Iraq and Afghanistan. The overarching long-term goal is to develop a fully-integrated, layered force protection system of systems for our forward deployed forces that is networked with the future force C4ISR systems architecture. The intent of the FIRRE program is to reduce manpower requirements, enhance force protection capabilities, and reduce casualties through the use of unmanned systems. FIRRE is sponsored by the Office of the Under Secretary of Defense, Acquisitions, Technology and Logistics (OUSD AT&L), and is managed by the Product Manager, Force Protection Systems (PM-FPS). The FIRRE Command and Control (C2) Station supports two operators, hosts the Joint Battlespace Command and Control Software for Manned and Unmanned Assets (JBC2S), and will be able to host Mission Planning and Rehearsal (MPR) software. The C2 Station consists of an M1152 HMMWV fitted with an S-788 TYPE I shelter. The C2 Station employs five 24" LCD monitors for display of JBC2S software [1], MPR software, and live video feeds from unmanned systems. An audio distribution system allows each operator to select between various audio sources including: AN/PRC-117F tactical radio (SINCGARS compatible), audio prompts from JBC2S software, audio from unmanned systems, audio from other operators, and audio from external sources such as an intercom in an adjacent Tactical Operations Center (TOC). A power distribution system provides battery backup for momentary outages. The Ethernet network, audio distribution system, and audio/video feeds are available for use outside the C2 Station.

  6. Air cleaning performance of a new environmentally controlled primary crusher operator booth.

    PubMed

    Organiscak, J A; Cecala, A B; Zimmer, J A; Holen, B; Baregi, J R

    2016-02-01

    The National Institute for Occupational Safety and Health (NIOSH) cooperated with 3M Company in the design and testing of a new environmentally controlled primary crusher operator booth at the company's Wausau granite quarry near Wausau, WI. This quarry had an older crusher booth without a central heating, ventilation and air conditioning (HVAC) system, and without an air filtration and pressurization system. A new replacement operator booth was designed and installed by 3M based on design considerations from past NIOSH research on enclosed cab filtration systems. NIOSH conducted pre-testing of the old booth and post-testing of the new booth to assess the new filtration and pressurization system's effectiveness in controlling airborne dusts and particulates. The booth's dust and particulate control effectiveness is described by its protection factor, expressed as a ratio of the outside to inside concentrations measured during testing. Results indicate that the old booth provided negligible airborne respirable dust protection and low particulate protection from the outside environment. The newly installed booth provided average respirable dust protection factors from 2 to 25 over five shifts of dust sampling with occasional worker ingress and egress from the booth, allowing some unfiltered contaminants to enter the enclosure. Shorter-term particle count testing outside and inside the booth under near-steady-state conditions, with no workers entering or exiting the booth, resulted in protection factors from 35 to 127 on 0.3- to 1.0-μm respirable size particulates under various HVAC airflow operating conditions.

  7. A modernized high-pressure heater protection system for nuclear and thermal power stations

    NASA Astrophysics Data System (ADS)

    Svyatkin, F. A.; Trifonov, N. N.; Ukhanova, M. G.; Tren'kin, V. B.; Koltunov, V. A.; Borovkov, A. I.; Klyavin, O. I.

    2013-09-01

    Experience gained from operation of high-pressure heaters and their protection systems serving to exclude ingress of water into the turbine is analyzed. A formula for determining the time for which the high-pressure heater shell steam space is filled when a rupture of tubes in it occurs is analyzed, and conclusions regarding the high-pressure heater design most advisable from this point of view are drawn. A typical structure of protection from increase of water level in the shell of high-pressure heaters used in domestically produced turbines for thermal and nuclear power stations is described, and examples illustrating this structure are given. Shortcomings of components used in the existing protection systems that may lead to an accident at the power station are considered. A modernized protection system intended to exclude the above-mentioned shortcomings was developed at the NPO Central Boiler-Turbine Institute and ZioMAR Engineering Company, and the design solutions used in this system are described. A mathematical model of the protection system's main elements (the admission and check valves) has been developed with participation of specialists from the St. Petersburg Polytechnic University, and a numerical investigation of these elements is carried out. The design version of surge tanks developed by specialists of the Central Boiler-Turbine Institute for excluding false operation of the high-pressure heater protection system is proposed.

  8. 40 CFR 63.744 - Standards: Cleaning operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... system with equivalent emission control. (e) Exempt cleaning operations. The following cleaning...) Cleaning of aircraft and ground support equipment fluid systems that are exposed to the fluid, including... 40 Protection of Environment 11 2014-07-01 2014-07-01 false Standards: Cleaning operations. 63.744...

  9. 40 CFR 63.744 - Standards: Cleaning operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... system with equivalent emission control. (e) Exempt cleaning operations. The following cleaning...) Cleaning of aircraft and ground support equipment fluid systems that are exposed to the fluid, including... 40 Protection of Environment 11 2013-07-01 2013-07-01 false Standards: Cleaning operations. 63.744...

  10. 40 CFR 63.744 - Standards: Cleaning operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... system with equivalent emission control. (e) Exempt cleaning operations. The following cleaning...) Cleaning of aircraft and ground support equipment fluid systems that are exposed to the fluid, including... 40 Protection of Environment 11 2012-07-01 2012-07-01 false Standards: Cleaning operations. 63.744...

  11. 40 CFR 63.744 - Standards: Cleaning operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... system with equivalent emission control. (e) Exempt cleaning operations. The following cleaning...) Cleaning of aircraft and ground support equipment fluid systems that are exposed to the fluid, including... 40 Protection of Environment 10 2011-07-01 2011-07-01 false Standards: Cleaning operations. 63.744...

  12. 40 CFR 63.744 - Standards: Cleaning operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... system with equivalent emission control. (e) Exempt cleaning operations. The following cleaning...) Cleaning of aircraft and ground support equipment fluid systems that are exposed to the fluid, including... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Standards: Cleaning operations. 63.744...

  13. A Path to Planetary Protection Requirements for Human Exploration: A Literature Review and Systems Engineering Approach

    NASA Technical Reports Server (NTRS)

    Johnson, James E.; Conley, Cassie; Siegel, Bette

    2015-01-01

    As systems, technologies, and plans for the human exploration of Mars and other destinations beyond low Earth orbit begin to coalesce, it is imperative that frequent and early consideration is given to how planetary protection practices and policy will be upheld. While the development of formal planetary protection requirements for future human space systems and operations may still be a few years from fruition, guidance to appropriately influence mission and system design will be needed soon to avoid costly design and operational changes. The path to constructing such requirements is a journey that espouses key systems engineering practices of understanding shared goals, objectives and concerns, identifying key stakeholders, and iterating a draft requirement set to gain community consensus. This paper traces through each of these practices, beginning with a literature review of nearly three decades of publications addressing planetary protection concerns with respect to human exploration. Key goals, objectives and concerns, particularly with respect to notional requirements, required studies and research, and technology development needs have been compiled and categorized to provide a current 'state of knowledge'. This information, combined with the identification of key stakeholders in upholding planetary protection concerns for human missions, has yielded a draft requirement set that might feed future iteration among space system designers, exploration scientists, and the mission operations community. Combining the information collected with a proposed forward path will hopefully yield a mutually agreeable set of timely, verifiable, and practical requirements for human space exploration that will uphold international commitment to planetary protection.

  14. 47 CFR 27.1134 - Protection of Federal Government operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... communications systems in the 1710-1755 MHz band at 16 protected facilities, nationwide. AWS licensees must... column of Table 1, and coordination with each affected DoD facility shall be accomplished through the... Service in the 1675-1700 MHz band or a meteorological-satellite earth receiver operating in the...

  15. 47 CFR 27.1134 - Protection of Federal Government operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... communications systems in the 1710-1755 MHz band at 16 protected facilities, nationwide. AWS licensees must... column of Table 1, and coordination with each affected DoD facility shall be accomplished through the... Service in the 1675-1700 MHz band or a meteorological-satellite earth receiver operating in the...

  16. 47 CFR 27.1134 - Protection of Federal Government operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... communications systems in the 1710-1755 MHz band at 16 protected facilities, nationwide. AWS licensees must... column of Table 1, and coordination with each affected DoD facility shall be accomplished through the... Service in the 1675-1700 MHz band or a meteorological-satellite earth receiver operating in the...

  17. 40 CFR 280.11 - Interim prohibition for deferred UST systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Will prevent releases due to corrosion or structural failure for the operational life of the UST system; (2) Is cathodically protected against corrosion, constructed of noncorrodible material, steel clad... substance. (b) Notwithstanding paragraph (a) of this section, an UST system without corrosion protection may...

  18. 40 CFR 280.11 - Interim prohibition for deferred UST systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Will prevent releases due to corrosion or structural failure for the operational life of the UST system; (2) Is cathodically protected against corrosion, constructed of noncorrodible material, steel clad... substance. (b) Notwithstanding paragraph (a) of this section, an UST system without corrosion protection may...

  19. 40 CFR 280.11 - Interim prohibition for deferred UST systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Will prevent releases due to corrosion or structural failure for the operational life of the UST system; (2) Is cathodically protected against corrosion, constructed of noncorrodible material, steel clad... substance. (b) Notwithstanding paragraph (a) of this section, an UST system without corrosion protection may...

  20. 40 CFR 280.11 - Interim prohibition for deferred UST systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Will prevent releases due to corrosion or structural failure for the operational life of the UST system; (2) Is cathodically protected against corrosion, constructed of noncorrodible material, steel clad... substance. (b) Notwithstanding paragraph (a) of this section, an UST system without corrosion protection may...

  1. 40 CFR 280.11 - Interim prohibition for deferred UST systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Will prevent releases due to corrosion or structural failure for the operational life of the UST system; (2) Is cathodically protected against corrosion, constructed of noncorrodible material, steel clad... substance. (b) Notwithstanding paragraph (a) of this section, an UST system without corrosion protection may...

  2. HOW TO SELECT THE PROPER SECURITY AND EQUIPMENT SURVEILLANCE SYSTEMS TO PROTECT YOUR FACILITIES.

    ERIC Educational Resources Information Center

    Honeywell, Inc., Minneapolis, Minn.

    IN PRESENTING A SURVEY OF MODERN SECURITY SYSTEMS, THIS BOOKLET DISCUSSES THE REQUIREMENTS FOR SURVEILLANCE AND PROTECTION OF AREAS, PERIMETER, AND OBJECTS. A VARIETY OF EQUIPMENT IS DESCRIBED WITH DISCUSSION OF OPERATING PROCEDURES, COSTS, AND RECENT DEVELOPMENTS IN SECURITY SYSTEMS. (JT)

  3. Health Effects of Too Much Sun

    MedlinePlus

    ... inquiries until appropriations are enacted. Updates regarding government operating status and resumption of normal operations can be ... some kinds of cataracts. Problems with the immune system top Your immune system protects your body from ...

  4. Future Interoperability of Camp Protection Systems (FICAPS)

    NASA Astrophysics Data System (ADS)

    Caron, Sylvie; Gündisch, Rainer; Marchand, Alain; Stahl, Karl-Hermann

    2013-05-01

    The FICAPS Project has been established as a Project of the European Defence Agency based on an initiative of Germany and France. Goal of this Project was to derive Guidelines, which by a proper implementation in future developments improve Camp Protection Systems (CPS) by enabling and improving interoperability between Camp Protection Systems and its Equipments of different Nations involved in multinational missions. These Guidelines shall allow for: • Real-time information exchange between equipments and systems of different suppliers and nations (even via SatCom), • Quick and easy replacement of equipments (even of different Nations) at run-time in the field by means of plug and play capability, thus lowering the operational and logistic costs and making the system highly available, • Enhancement of system capabilities (open and modular systems) by adding new equipment with new capabilities (just plug-in, automatic adjustment of the HMI Human Machine Interface) without costly and time consuming validation and test on system level (validation and test can be done on Equipment level), Four scenarios have been identified to summarize the interoperability requirements from an operational viewpoint. To prove the definitions given in the Guideline Document, a French and a German Demonstration System, based on existing national assets, were realized. Demonstrations, showing the capabilities given by the defined interoperability requirements with respect to the operational scenarios, were performed. Demonstrations included remote control of a CPS by another CPS, remote sensor control (Electro-Optic/InfraRed EO/IR) and remote effector control. This capability can be applied to extend the protection area or to protect distant infrastructural assets Demonstrations have been performed. The required interoperability functionality was shown successfully. Even if the focus of the FICAPS project was on camp protection, the solution found is also appropriate for other force protection and ISR (Intelligence Surveillance Reconnaissance) tasks not only due to its flexibility but also due to the chosen interfacing.

  5. 14 CFR 33.68 - Induction system icing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES Design and Construction; Turbine Aircraft Engines § 33.68 Induction system icing. Each engine, with all icing protection systems operating, must— (a) Operate throughout its flight power...

  6. 14 CFR 33.68 - Induction system icing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES Design and Construction; Turbine Aircraft Engines § 33.68 Induction system icing. Each engine, with all icing protection systems operating, must— (a) Operate throughout its flight power...

  7. D0 Central Tracking Solenoid Energization, Controls, Interlocks and Quench Protection Operating Procedures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hance, R.; /Fermilab

    1998-08-26

    This procedure is used when it is necessary to operate the solenoid energization, controls, interlocks and quench detection system. Note that a separate procedure exists for operating the solenoid 'cryogenic' systems. Only D0 Control Room Operators or the Project Electrical Engineer are qualified to execute these procedures or operate the solenoid system. This procedure assumes that the operator is familiar with using the Distributed Manufacturing Automation and Control Software (DMACS).

  8. Application of Hybrid Real-Time Power System Simulator for Designing and Researching of Relay Protection and Automation

    NASA Astrophysics Data System (ADS)

    Borovikov, Yu S.; Sulaymanov, A. O.; Andreev, M. V.

    2015-10-01

    Development, research and operation of smart grids (SG) with active-adaptive networks (AAS) are actual tasks for today. Planned integration of high-speed FACTS devices greatly complicates complex dynamic properties of power systems. As a result the operating conditions of equipment of power systems are significantly changing. Such situation creates the new actual problem of development and research of relay protection and automation (RPA) which will be able to adequately operate in the SGs and adapt to its regimes. Effectiveness of solution of the problem depends on using tools - different simulators of electric power systems. Analysis of the most famous and widely exploited simulators led to the conclusion about the impossibility of using them for solution of the mentioned problem. In Tomsk Polytechnic University developed the prototype of hybrid multiprocessor software and hardware system - Hybrid Real-Time Power System Simulator (HRTSim). Because of its unique features this simulator can be used for solution of mentioned tasks. This article introduces the concept of development and research of relay protection and automation with usage of HRTSim.

  9. 21 CFR 110.20 - Plant and grounds.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... filth, or providing a breeding place for pests. (4) Operating systems for waste treatment and disposal... controls and operating practices or effective design, including the separation of operations in which..., enclosed systems, or other effective means. (3) Permit the taking of proper precautions to protect food in...

  10. 21 CFR 110.20 - Plant and grounds.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... filth, or providing a breeding place for pests. (4) Operating systems for waste treatment and disposal... controls and operating practices or effective design, including the separation of operations in which..., enclosed systems, or other effective means. (3) Permit the taking of proper precautions to protect food in...

  11. 21 CFR 110.20 - Plant and grounds.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... filth, or providing a breeding place for pests. (4) Operating systems for waste treatment and disposal... controls and operating practices or effective design, including the separation of operations in which..., enclosed systems, or other effective means. (3) Permit the taking of proper precautions to protect food in...

  12. Planetary Protection Considerations for Life Support and Habitation Systems

    NASA Technical Reports Server (NTRS)

    Barta, Daniel J.; Hogan, John A.

    2010-01-01

    Life support systems for future human missions beyond low Earth orbit may include a combination of existing hardware components and advanced technologies. Discipline areas for technology development include atmosphere revitalization, water recovery, solid waste management, crew accommodations, food production, thermal systems, environmental monitoring, fire protection and radiation protection. Life support systems will be influenced by in situ resource utilization (ISRU), crew mobility and the degree of extravehicular activity. Planetary protection represents an additional set of requirements that technology developers have generally not considered. Planetary protection guidelines will affect the kind of operations, processes, and functions that can take place during future exploration missions, including venting and discharge of liquids and solids, ejection of wastes, use of ISRU, requirements for cabin atmospheric trace contaminant concentrations, cabin leakage and restrictions on what materials, organisms, and technologies that may be brought on missions. Compliance with planetary protection requirements may drive development of new capabilities or processes (e.g. in situ sterilization, waste containment, contaminant measurement) and limit or prohibit certain kinds of operations or processes (e.g. unfiltered venting). Ultimately, there will be an effect on mission costs, including the mission trade space. Planetary protection requirements need to be considered early in technology development programs. It is expected that planetary protection will have a major impact on technology selection for future missions.

  13. Fault tolerant computing: A preamble for assuring viability of large computer systems

    NASA Technical Reports Server (NTRS)

    Lim, R. S.

    1977-01-01

    The need for fault-tolerant computing is addressed from the viewpoints of (1) why it is needed, (2) how to apply it in the current state of technology, and (3) what it means in the context of the Phoenix computer system and other related systems. To this end, the value of concurrent error detection and correction is described. User protection, program retry, and repair are among the factors considered. The technology of algebraic codes to protect memory systems and arithmetic codes to protect memory systems and arithmetic codes to protect arithmetic operations is discussed.

  14. WASTE TREATMENT BUILDING SYSTEM DESCRIPTION DOCUMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    F. Habashi

    2000-06-22

    The Waste Treatment Building System provides the space, layout, structures, and embedded subsystems that support the processing of low-level liquid and solid radioactive waste generated within the Monitored Geologic Repository (MGR). The activities conducted in the Waste Treatment Building include sorting, volume reduction, and packaging of dry waste, and collecting, processing, solidification, and packaging of liquid waste. The Waste Treatment Building System is located on the surface within the protected area of the MGR. The Waste Treatment Building System helps maintain a suitable environment for the waste processing and protects the systems within the Waste Treatment Building (WTB) from mostmore » of the natural and induced environments. The WTB also confines contaminants and provides radiological protection to personnel. In addition to the waste processing operations, the Waste Treatment Building System provides space and layout for staging of packaged waste for shipment, industrial and radiological safety systems, control and monitoring of operations, safeguards and security systems, and fire protection, ventilation and utilities systems. The Waste Treatment Building System also provides the required space and layout for maintenance activities, tool storage, and administrative facilities. The Waste Treatment Building System integrates waste processing systems within its protective structure to support the throughput rates established for the MGR. The Waste Treatment Building System also provides shielding, layout, and other design features to help limit personnel radiation exposures to levels which are as low as is reasonably achievable (ALARA). The Waste Treatment Building System interfaces with the Site Generated Radiological Waste Handling System, and with other MGR systems that support the waste processing operations. The Waste Treatment Building System interfaces with the General Site Transportation System, Site Communications System, Site Water System, MGR Site Layout, Safeguards and Security System, Site Radiological Monitoring System, Site Electrical Power System, Site Compressed Air System, and Waste Treatment Building Ventilation System.« less

  15. 48 CFR 970.0309 - Whistleblower Protection of Contractor Employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Whistleblower Protection of Contractor Employees. 970.0309 Section 970.0309 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business...

  16. 48 CFR 970.0309 - Whistleblower Protection of Contractor Employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Whistleblower Protection of Contractor Employees. 970.0309 Section 970.0309 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business...

  17. Neutron Source Facility Training Simulator Based on EPICS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Park, Young Soo; Wei, Thomas Y.; Vilim, Richard B.

    A plant operator training simulator is developed for training the plant operators as well as for design verification of plant control system (PCS) and plant protection system (PPS) for the Kharkov Institute of Physics and Technology Neutron Source Facility. The simulator provides the operator interface for the whole plant including the sub-critical assembly coolant loop, target coolant loop, secondary coolant loop, and other facility systems. The operator interface is implemented based on Experimental Physics and Industrial Control System (EPICS), which is a comprehensive software development platform for distributed control systems. Since its development at Argonne National Laboratory, it has beenmore » widely adopted in the experimental physics community, e.g. for control of accelerator facilities. This work is the first implementation for a nuclear facility. The main parts of the operator interface are the plant control panel and plant protection panel. The development involved implementation of process variable database, sequence logic, and graphical user interface (GUI) for the PCS and PPS utilizing EPICS and related software tools, e.g. sequencer for sequence logic, and control system studio (CSS-BOY) for graphical use interface. For functional verification of the PCS and PPS, a plant model is interfaced, which is a physics-based model of the facility coolant loops implemented as a numerical computer code. The training simulator is tested and demonstrated its effectiveness in various plant operation sequences, e.g. start-up, shut-down, maintenance, and refueling. It was also tested for verification of the plant protection system under various trip conditions.« less

  18. Multisensor interoperability for persistent surveillance and FOB protection with multiple technologies during the TNT exercise at Camp Roberts, California

    NASA Astrophysics Data System (ADS)

    Murarka, Naveen; Chambers, Jon

    2012-06-01

    Multiple sensors, providing actionable intelligence to the war fighter, often have difficulty interoperating with each other. Northrop Grumman (NG) is dedicated to solving these problems and providing complete solutions for persistent surveillance. In August, 2011, NG was invited to participate in the Tactical Network Topology (TNT) Capabilities Based Experimentation at Camp Roberts, CA to demonstrate integrated system capabilities providing Forward Operating Base (FOB) protection. This experiment was an opportunity to leverage previous efforts from NG's Rotorcraft Avionics Innovation Laboratory (RAIL) to integrate five prime systems with widely different capabilities. The five systems included a Hostile Fire and Missile Warning Sensor System, SCORPION II Unattended Ground Sensor system, Smart Integrated Vehicle Area Network (SiVAN), STARLite Synthetic Aperture Radar (SAR)/Ground Moving Target Indications (GMTI) radar system, and a vehicle with Target Location Module (TLM) and Laser Designation Module (LDM). These systems were integrated with each other and a Tactical Operations Center (TOC) equipped with RaptorX and Falconview providing a Common Operational Picture (COP) via Cursor on Target (CoT) messages. This paper will discuss this exercise, and the lessons learned, by integrating these five prime systems for persistent surveillance and FOB protection.

  19. FIELD DEMONSTRATION OF THE LINDE OXYGEN COMBUSTION SYSTEM ON THE EPA MOBILE INCINERATOR

    EPA Science Inventory

    This paper summarizes the various system performance tests and the long-term operating experience of the LINDE Oxygen Combustion System installed on the U.S. Environmental Protection Agency's Mobile Incineration System (MIS) when it was in operation at the Denney Farm site in sou...

  20. 49 CFR 393.69 - Liquefied petroleum gas systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Protection Association, Battery March Park, Quincy, MA 02269, as follows: (1) A fuel system installed before... ACCESSORIES NECESSARY FOR SAFE OPERATION Fuel Systems § 393.69 Liquefied petroleum gas systems. (a) A fuel system that uses liquefied petroleum gas as a fuel for the operation of a motor vehicle or for the...

  1. 40 CFR 51.119 - Intermittent control systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., 1970, and was operated as specified by the operating system of the ICS before December 31, 1970. (3... 40 Protection of Environment 2 2014-07-01 2014-07-01 false Intermittent control systems. 51.119... Intermittent control systems. (a) The use of an intermittent control system (ICS) may be taken into account in...

  2. 40 CFR 51.119 - Intermittent control systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., 1970, and was operated as specified by the operating system of the ICS before December 31, 1970. (3... 40 Protection of Environment 2 2011-07-01 2011-07-01 false Intermittent control systems. 51.119... Intermittent control systems. (a) The use of an intermittent control system (ICS) may be taken into account in...

  3. 40 CFR 51.119 - Intermittent control systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., 1970, and was operated as specified by the operating system of the ICS before December 31, 1970. (3... 40 Protection of Environment 2 2012-07-01 2012-07-01 false Intermittent control systems. 51.119... Intermittent control systems. (a) The use of an intermittent control system (ICS) may be taken into account in...

  4. 40 CFR 51.119 - Intermittent control systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., 1970, and was operated as specified by the operating system of the ICS before December 31, 1970. (3... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Intermittent control systems. 51.119... Intermittent control systems. (a) The use of an intermittent control system (ICS) may be taken into account in...

  5. 40 CFR 51.119 - Intermittent control systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., 1970, and was operated as specified by the operating system of the ICS before December 31, 1970. (3... 40 Protection of Environment 2 2013-07-01 2013-07-01 false Intermittent control systems. 51.119... Intermittent control systems. (a) The use of an intermittent control system (ICS) may be taken into account in...

  6. Status of the Superconducting Insertion Device Control at TLS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hu, K. H.; Wang, C. J.; Lee, Demi

    2007-01-19

    Superconducting insertion devices are installed at Taiwan Light Source to meet the rapidly growing demand of X-ray users. A control system supports the operation of all these superconducting insertion devices. Control system coordinates the operation of the main power supply and the trimming power supply to charge/discharge the magnet and provide essential interlock protection for the coils and vacuum ducts. Quench protection and various cryogenic interlocks are designed to prevent damage to the magnet. A friendly user interface supports routine operation. Various applications are also developed to aid the operation of these insertion devices. Design consideration and details of themore » implementation will be summarized in this report.« less

  7. Propulsion system performance resulting from an integrated flight/propulsion control design

    NASA Technical Reports Server (NTRS)

    Mattern, Duane; Garg, Sanjay

    1992-01-01

    Propulsion-system-specific results are presented from the application of the integrated methodology for propulsion and airframe control (IMPAC) design approach to integrated flight/propulsion control design for a 'short takeoff and vertical landing' (STOVL) aircraft in transition flight. The IMPAC method is briefly discussed and the propulsion system specifications for the integrated control design are examined. The structure of a linear engine controller that results from partitioning a linear centralized controller is discussed. The details of a nonlinear propulsion control system are presented, including a scheme to protect the engine operational limits: the fan surge margin and the acceleration/deceleration schedule that limits the fuel flow. Also, a simple but effective multivariable integrator windup protection scheme is examined. Nonlinear closed-loop simulation results are presented for two typical pilot commands for transition flight: acceleration while maintaining flightpath angle and a change in flightpath angle while maintaining airspeed. The simulation nonlinearities include the airframe/engine coupling, the actuator and sensor dynamics and limits, the protection scheme for the engine operational limits, and the integrator windup protection. Satisfactory performance of the total airframe plus engine system for transition flight, as defined by the specifications, was maintained during the limit operation of the closed-loop engine subsystem.

  8. Application of Phasor Measurement Units for Protection of Distribution Networks with High Penetration of Photovoltaic Sources

    NASA Astrophysics Data System (ADS)

    Meskin, Matin

    The rate of the integration of distributed generation (DG) units to the distribution level to meet the growth in demand increases as a reasonable replacement for costly network expansion. This integration brings many advantages to the consumers and power grids, as well as giving rise to more challenges in relation to protection and control. Recent research has brought to light the negative effects of DG units on short circuit currents and overcurrent (OC) protection systems in distribution networks. Change in the direction of fault current flow, increment or decrement of fault current magnitude, blindness of protection, feeder sympathy trip, nuisance trip of interrupting devices, and the disruption of coordination between protective devices are some potential impacts of DG unit integration. Among other types of DG units, the integration of renewable energy resources into the electric grid has seen a vast improvement in recent years. In particular, the interconnection of photovoltaic (PV) sources to the medium voltage (MV) distribution networks has experienced a rapid increase in the last decade. In this work, the effect of PV source on conventional OC relays in MV distribution networks is shown. It is indicated that the PV output fluctuation, due to changes in solar radiation, causes the magnitude and direction of the current to change haphazardly. These variations may result in the poor operation of OC relays as the main protective devices in the MV distribution networks. In other words, due to the bi-directional power flow characteristic and the fluctuation of current magnitude occurring in the presence of PV sources, a specific setting of OC relays is difficult to realize. Therefore, OC relays may operate in normal conditions. To improve the OC relay operation, a voltage-dependent-overcurrent protection is proposed. Although, this new method prevents the OC relay from maloperation, its ability to detect earth faults and high impedance faults is poor. Thus, a comprehensive protective system is suggested at the end of the dissertation. The proposed method is based on the application of the phasor measurement unit (PMU) and the differential protection method. All of the current magnitudes and angles are collected by PMU and are sent to the phasor data concentrator (PDC), where a differential protection algorithm is applied to these data. If any fault is detected, the trip will be sent back to the corresponding circuit breakers across the network. Higher selectivity, sensitivity, and faster operation in the differential protection are superior to those of other protection schemes. Differential protection operates as unit protection, which means that it operates only when there is a fault in the protection zone. It does not function for faults occurring out of zone. Therefore, no coordination is required between differential protections across the power system. Moreover, the misoperation of this protective scheme is less likely as compared to other protection methods.

  9. Computational techniques for design optimization of thermal protective systems for the space shuttle vehicle. Volume 2: User's manual

    NASA Technical Reports Server (NTRS)

    1971-01-01

    A modular program for design optimization of thermal protection systems is discussed. Its capabilities and limitations are reviewed. Instructions for the operation of the program, output, and the program itself are given.

  10. Evaluation of seating and restraint systems and anthropomorphic dummies conducted during fiscal year 1976.

    DOT National Transportation Integrated Search

    1978-02-01

    The results of test programs conducted by the Protection and Survival Laboratory to investigate the performance of prototype or operational seating and restraint systems relative to their ability to provide protection against crash injury and to inve...

  11. Evaluation of seating and restraint systems and anthropomorphic dummies conducted during fiscal year 1977.

    DOT National Transportation Integrated Search

    1978-06-01

    The results of test programs conducted by the Protection and Survival Laboratory to investigate the performance of prototype or operational seating and restraint systems relative to their ability to provide protection against crash injury and to inve...

  12. 10 CFR 72.126 - Criteria for radiological protection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... Radiation protection systems must be provided for all areas and operations where onsite personnel may be exposed to radiation or airborne radioactive materials. Structures, systems, and components for which..., fabricated, located, shielded, controlled, and tested so as to control external and internal radiation...

  13. 10 CFR 72.126 - Criteria for radiological protection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... Radiation protection systems must be provided for all areas and operations where onsite personnel may be exposed to radiation or airborne radioactive materials. Structures, systems, and components for which..., fabricated, located, shielded, controlled, and tested so as to control external and internal radiation...

  14. 10 CFR 72.126 - Criteria for radiological protection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... Radiation protection systems must be provided for all areas and operations where onsite personnel may be exposed to radiation or airborne radioactive materials. Structures, systems, and components for which..., fabricated, located, shielded, controlled, and tested so as to control external and internal radiation...

  15. 10 CFR 72.126 - Criteria for radiological protection.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .... Radiation protection systems must be provided for all areas and operations where onsite personnel may be exposed to radiation or airborne radioactive materials. Structures, systems, and components for which..., fabricated, located, shielded, controlled, and tested so as to control external and internal radiation...

  16. The Effect of Operating Lamps on the Protected Area of a Unidirectional Down Flow (UDF) System.

    PubMed

    Traversari, A A L; Bottenheft, C; Louman, R; van Heumen, S P M; Böggemann, J

    2017-04-01

    Operating lamps are often seen as the most disruptive factors within the protective area in the operating theater (OT). The effect of the operation lamps (with different shapes) should be demonstrated in an OT by trial, since research on the effects of the lamps is still limited. The main aim of this study was to determine the effects of a skirt, different lamps, and the position of the lamp on the protected area. The concentration of airborne particles was measured under different circumstances, in order to determine the size and quality of the protected area. This entrainment/segregation test is based on the deliberate and controlled emission of particles outside the zone that is protected. The degree of protection (DP) at the center of the protected area was higher for the case with the skirt. This skirt stimulates more down flow and prevents the early entry of particles into the protected area. It can also be concluded that Lamp Y, due to its open shape, has the most positive effect on the DP at the center. It has also been shown that the position of the lamp has an effect on the protected area.

  17. 40 CFR 280.21 - Upgrading of existing UST systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... sound and free of corrosion holes prior to installing the cathodic protection system; or (ii) The tank... for corrosion holes by conducting two (2) tightness tests that meet the requirements of § 280.43(c... operation of the cathodic protection system; or (iv) The tank is assessed for corrosion holes by a method...

  18. 40 CFR 280.21 - Upgrading of existing UST systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... sound and free of corrosion holes prior to installing the cathodic protection system; or (ii) The tank... for corrosion holes by conducting two (2) tightness tests that meet the requirements of § 280.43(c... operation of the cathodic protection system; or (iv) The tank is assessed for corrosion holes by a method...

  19. On the possibility of connecting a non-operating main circulation pump with three pumps in operation without preliminary coast-down of power-generating unit No. 5 in the Novovoronezh nuclear power plant

    NASA Astrophysics Data System (ADS)

    Vitkovskii, I. L.; Nikonov, S. P.; Ryasnyi, S. I.

    2014-02-01

    The subject of this paper is a transient caused by connection of a standby loop to three operating circulation pumps at the initial reactor heat rate equal to 70% of the rated value without preliminarily reducing it to 30% of the rated level as required by the safe operation regulations. Failure of the following normal operation systems is supposed: the first- and the second-type warning protection systems, all quick-acting reducing devices releasing steam into the auxiliary manifold, the electric heaters of the pressurizer, the pressurizer injection system, the primary cooling circuit fluid makeup/blow-through systems, and the blocking systems to shut down the main circulation pump after the level in the steam generator is exceeded. In addition, it is supposed that, under transient conditions, the valves of the turbine regulation system will be in the position in which they were at the moment of the initial event until generation of the signal for positive closing of the turbine stop valves. The first signal to actuate the reactor emergency protection system (EPS) is skipped. The failure of all quick-acting reducing devices releasing steam into the atmosphere is assumed. In addition to equipment failure, at the moment when the main circulation pump is connected, the operator erroneously puts in a new setting to maintain the power allowable for four pumps in operation-in the calculations it was taken equal to 104% of the rated level at most considering the accuracy of evaluating and maintaining the reactor heat rate-and the working group of the reactor protection and control system (P&CS) starts moving upward. On reaching the set power level, the automatic reactor power regulator stops operating and the P&CS elements remain in the position in which they are at the moment. Compliance with the design safety criteria for the adopted scenario of the transient is demonstrated.

  20. Problems of collaborative work of the automated process control system (APCS) and the its information security and solutions.

    NASA Astrophysics Data System (ADS)

    Arakelyan, E. K.; Andryushin, A. V.; Mezin, S. V.; Kosoy, A. A.; Kalinina, Ya V.; Khokhlov, I. S.

    2017-11-01

    The principle of interaction of the specified systems of technological protections by the Automated process control system (APCS) and information safety in case of incorrect execution of the algorithm of technological protection is offered. - checking the correctness of the operation of technological protection in each specific situation using the functional relationship between the monitored parameters. The methodology for assessing the economic feasibility of developing and implementing an information security system.

  1. 40 CFR 112.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Definitions. 112.2 Section 112.2 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION... when identifying response systems and equipment in a response plan for the applicable operating...

  2. 40 CFR 112.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Definitions. 112.2 Section 112.2 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION... when identifying response systems and equipment in a response plan for the applicable operating...

  3. 40 CFR 112.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Definitions. 112.2 Section 112.2 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION... when identifying response systems and equipment in a response plan for the applicable operating...

  4. 78 FR 73112 - Monitoring System Conditions-Transmission Operations Reliability Standards; Interconnection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-05

    ..., RM13-14-000 and RM13-15-000] Monitoring System Conditions--Transmission Operations Reliability...) 502-6817, [email protected] . Robert T. Stroh (Legal Information), Office of the General... Reliability Standards ``address the important reliability goal of ensuring that the transmission system is...

  5. Water Quality in Small Community Distribution Systems. A Reference Guide for Operators

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) has developed this reference guide to assist the operators and managers of small- and medium-sized public water systems. This compilation provides a comprehensive picture of the impact of the water distribution system network on dist...

  6. Verification of an IGBT Fusing Switch for Over-current Protection of the SNS HVCM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Benwell, Andrew; Kemp, Mark; Burkhart, Craig

    2010-06-11

    An IGBT based over-current protection system has been developed to detect faults and limit the damage caused by faults in high voltage converter modulators. During normal operation, an IGBT enables energy to be transferred from storage capacitors to a H-bridge. When a fault occurs, the over-current protection system detects the fault, limits the fault current and opens the IGBT to isolate the remaining stored energy from the fault. This paper presents an experimental verification of the over-current protection system under applicable conditions.

  7. Current Technology for Thermal Protection Systems

    NASA Technical Reports Server (NTRS)

    Scotti, Stephen J. (Compiler)

    1992-01-01

    Interest in thermal protection systems for high-speed vehicles is increasing because of the stringent requirements of such new projects as the Space Exploration Initiative, the National Aero-Space Plane, and the High-Speed Civil Transport, as well as the needs for improved capabilities in existing thermal protection systems in the Space Shuttle and in turbojet engines. This selection of 13 papers from NASA and industry summarizes the history and operational experience of thermal protection systems utilized in the national space program to date, and also covers recent development efforts in thermal insulation, refractory materials and coatings, actively cooled structures, and two-phase thermal control systems.

  8. Emerging technologies for V&V of ISHM software for space exploration

    NASA Technical Reports Server (NTRS)

    Feather, Martin S.; Markosian, Lawrence Z.

    2006-01-01

    Systems1,2 required to exhibit high operational reliability often rely on some form of fault protection to recognize and respond to faults, preventing faults' escalation to catastrophic failures. Integrated System Health Management (ISHM) extends the functionality of fault protection to both scale to more complex systems (and systems of systems), and to maintain capability rather than just avert catastrophe. Forms of ISHM have been utilized to good effect in the maintenance phase of systems' total lifecycles (often referred to as 'condition-based mainte-nance'), but less so in a 'fault protection' role during actual operations. One of the impediments to such use lies in the challenges of verification, validation and certification of ISHM systems themselves. This paper makes the case that state-of-the-practice V&V and certification techniques will not suffice for emerging forms of ISHM systems; however, a number of maturing software engineering assurance technologies show particular promise for addressing these ISHM V&V challenges.

  9. 40 CFR 60.5415 - How do I demonstrate continuous compliance with the standards for my gas well affected facility...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... plants? 60.5415 Section 60.5415 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR..., and unavoidable failure of air pollution control equipment, process equipment, or a process to operate... control systems were kept in operation if at all possible, consistent with safety and good air pollution...

  10. 77 FR 67659 - Notice of Availability of the Final Programmatic Environmental Assessment and Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ... Operation of Low Energy X-Ray Inspection Systems at U.S. Customs and Border Protection Operational Areas... Environmental Assessment (PEA) and a Finding of No Significant Impact (FONSI) for Low Energy X-Ray Inspection... Protection, telephone (202) 344-3131. SUPPLEMENTARY INFORMATION: LEXRIS LEXRIS is a low energy x-ray...

  11. 40 CFR 63.1184 - What do I need to know about the design specifications, installation, and operation of a bag leak...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., each compartment or cell must have a bag leak detector. For a negative-pressure or induced-air fabric... design specifications, installation, and operation of a bag leak detection system? 63.1184 Section 63.1184 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED...

  12. 40 CFR 63.1184 - What do I need to know about the design specifications, installation, and operation of a bag leak...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., each compartment or cell must have a bag leak detector. For a negative-pressure or induced-air fabric... design specifications, installation, and operation of a bag leak detection system? 63.1184 Section 63.1184 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED...

  13. 40 CFR 63.1184 - What do I need to know about the design specifications, installation, and operation of a bag leak...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., each compartment or cell must have a bag leak detector. For a negative-pressure or induced-air fabric... design specifications, installation, and operation of a bag leak detection system? 63.1184 Section 63.1184 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED...

  14. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...

  15. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of Continuous...

  16. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...

  17. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...

  18. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of Continuous...

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soubies, B.; Henry, J.Y.; Le Meur, M.

    1300 MWe pressurised water reactors (PWRs), like the 1400 MWe reactors, operate with microprocessor-based safety systems. This is particularly the case for the Digital Integrated Protection System (SPIN), which trips the reactor in an emergency and sets in action the safeguard functions. The softwares used in these systems must therefore be highly dependable in the execution of their functions. In the case of SPIN, three players are working at different levels to achieve this goal: the protection system manufacturer, Merlin Gerin; the designer of the nuclear steam supply system, Framatome; the operator of the nuclear power plants, Electricite de Francemore » (EDF), which is also responsible for the safety of its installations. Regulatory licenses are issued by the French safety authority, the Nuclear Installations Safety Directorate (French abbreviation DSIN), subsequent to a successful examination of the technical provisions adopted by the operator. This examination is carried out by the IPSN and the standing group on nuclear reactors. This communication sets out: the methods used by the manufacturer to develop SPIN software for the 1400 MWe PWRs (N4 series); the approach adopted by the IPSN to evaluate the safety software of the protection system for the N4 series of reactors.« less

  20. 40 CFR 87.80 - Introduction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Introduction. 87.80 Section 87.80 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR... various operating points representative of engine usage in aircraft. Other smoke measurement systems may...

  1. 40 CFR 87.80 - Introduction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Introduction. 87.80 Section 87.80 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR... various operating points representative of engine usage in aircraft. Other smoke measurement systems may...

  2. 40 CFR 60.698 - Reporting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Reporting requirements. 60.698 Section 60.698 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Petroleum Refinery Wastewater Systems § 60.698 Reporting requirements. (a) An owner or operator electing to...

  3. Memory protection

    NASA Technical Reports Server (NTRS)

    Denning, Peter J.

    1988-01-01

    Accidental overwriting of files or of memory regions belonging to other programs, browsing of personal files by superusers, Trojan horses, and viruses are examples of breakdowns in workstations and personal computers that would be significantly reduced by memory protection. Memory protection is the capability of an operating system and supporting hardware to delimit segments of memory, to control whether segments can be read from or written into, and to confine accesses of a program to its segments alone. The absence of memory protection in many operating systems today is the result of a bias toward a narrow definition of performance as maximum instruction-execution rate. A broader definition, including the time to get the job done, makes clear that cost of recovery from memory interference errors reduces expected performance. The mechanisms of memory protection are well understood, powerful, efficient, and elegant. They add to performance in the broad sense without reducing instruction execution rate.

  4. 40 CFR 85.510 - Exemption provisions for new and relatively new vehicles/engines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... system, engine calibration, and emission control system functionality when operating on the fuel with... relatively new vehicles/engines. 85.510 Section 85.510 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Exemption of...

  5. 5 CFR 1207.150 - Program accessibility: Existing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... facilities. 1207.150 Section 1207.150 Administrative Personnel MERIT SYSTEMS PROTECTION BOARD ORGANIZATION... CONDUCTED BY THE MERIT SYSTEMS PROTECTION BOARD § 1207.150 Program accessibility: Existing facilities. (a) General. The agency shall operate each program or activity so that the program or activity, when viewed in...

  6. 77 FR 33243 - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-05

    ... Operations Management Tricon Programmable Logic Controller (PLC), Version 10, and the CS Innovations, LLC... process protection system that is based on the Invensys Operations Management Tricon Programmable Logic...

  7. 47 CFR 74.634 - Remote control operation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...

  8. 47 CFR 74.634 - Remote control operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...

  9. 47 CFR 74.634 - Remote control operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...

  10. 47 CFR 74.634 - Remote control operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...

  11. 47 CFR 74.634 - Remote control operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...

  12. Challenges and Plans for Injection and Beam Dump

    NASA Astrophysics Data System (ADS)

    Barnes, M.; Goddard, B.; Mertens, V.; Uythoven, J.

    The injection and beam dumping systems of the LHC will need to be upgraded to comply with the requirements of operation with the HL-LHC beams. The elements of the injection system concerned are the fixed and movable absorbers which protect the LHC in case of an injection kicker error and the injection kickers themselves. The beam dumping system elements under study are the absorbers which protect the aperture in case of an asynchronous beam dump and the beam absorber block. The operational limits of these elements and the new developments in the context of the HL-LHC project are described.

  13. Precise time and time interval applications to electric power systems

    NASA Technical Reports Server (NTRS)

    Wilson, Robert E.

    1992-01-01

    There are many applications of precise time and time interval (frequency) in operating modern electric power systems. Many generators and customer loads are operated in parallel. The reliable transfer of electrical power to the consumer partly depends on measuring power system frequency consistently in many locations. The internal oscillators in the widely dispersed frequency measuring units must be syntonized. Elaborate protection and control systems guard the high voltage equipment from short and open circuits. For the highest reliability of electric service, engineers need to study all control system operations. Precise timekeeping networks aid in the analysis of power system operations by synchronizing the clocks on recording instruments. Utility engineers want to reproduce events that caused loss of service to customers. Precise timekeeping networks can synchronize protective relay test-sets. For dependable electrical service, all generators and large motors must remain close to speed synchronism. The stable response of a power system to perturbations is critical to continuity of electrical service. Research shows that measurement of the power system state vector can aid in the monitoring and control of system stability. If power system operators know that a lightning storm is approaching a critical transmission line or transformer, they can modify operating strategies. Knowledge of the location of a short circuit fault can speed the re-energizing of a transmission line. One fault location technique requires clocks synchronized to one microsecond. Current research seeks to find out if one microsecond timekeeping can aid and improve power system control and operation.

  14. Distributed C2 System Recovery Mechanisms

    DTIC Science & Technology

    1988-07-01

    Systems," Proceedings of IEEE, Vol. 63, No. 6, 1975. (COHE75] Cohen, Ellis, David Jefferson, "Protection in the Hydra Operating System," Fifth...ideas in a real system. Distributed Operating System. Minn ACM Symposium an Operating SY’st*m Principles, October 1983, PP. 4~9-0. [REDEMo] Redell, David ...A transaction soy spawn a musher of node where it was interrupted with a now phase assigned children transactions at a PORK node. end the children

  15. 75 FR 48329 - Tribal Drinking Water Operator Certification Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9186-8] Tribal Drinking Water Operator Certification Program... details of EPA's voluntary Tribal Drinking Water Operator Certification Program, effective October 1, 2010. The program enables qualified drinking water operators at public water systems in Indian country to be...

  16. 40 CFR 265.202 - Air emission standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Air emission standards. 265.202 Section 265.202 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... DISPOSAL FACILITIES Tank Systems § 265.202 Air emission standards. The owner or operator shall manage all...

  17. 40 CFR 264.200 - Air emission standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Air emission standards. 264.200 Section 264.200 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... Tank Systems § 264.200 Air emission standards. The owner or operator shall manage all hazardous waste...

  18. 40 CFR 265.202 - Air emission standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Air emission standards. 265.202 Section 265.202 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... DISPOSAL FACILITIES Tank Systems § 265.202 Air emission standards. The owner or operator shall manage all...

  19. 40 CFR 264.200 - Air emission standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Air emission standards. 264.200 Section 264.200 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... Tank Systems § 264.200 Air emission standards. The owner or operator shall manage all hazardous waste...

  20. 40 CFR 265.202 - Air emission standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Air emission standards. 265.202 Section 265.202 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... DISPOSAL FACILITIES Tank Systems § 265.202 Air emission standards. The owner or operator shall manage all...

  1. 40 CFR 264.200 - Air emission standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Air emission standards. 264.200 Section 264.200 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... Tank Systems § 264.200 Air emission standards. The owner or operator shall manage all hazardous waste...

  2. 40 CFR 265.202 - Air emission standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Air emission standards. 265.202 Section 265.202 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... DISPOSAL FACILITIES Tank Systems § 265.202 Air emission standards. The owner or operator shall manage all...

  3. 40 CFR 264.200 - Air emission standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Air emission standards. 264.200 Section 264.200 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... Tank Systems § 264.200 Air emission standards. The owner or operator shall manage all hazardous waste...

  4. Protecting Public-Access Computers in Libraries.

    ERIC Educational Resources Information Center

    King, Monica

    1999-01-01

    Describes one public library's development of a computer-security plan, along with helpful products used. Discussion includes Internet policy, physical protection of hardware, basic protection of the operating system and software on the network, browser dilemmas and maintenance, creating clear intuitive interface, and administering fair use and…

  5. Measurement results obtained from air quality monitoring system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Turzanski, P.K.; Beres, R.

    1995-12-31

    An automatic system of air pollution monitoring operates in Cracow since 1991. The organization, assembling and start-up of the network is a result of joint efforts of the US Environmental Protection Agency and the Cracow environmental protection service. At present the automatic monitoring network is operated by the Provincial Inspection of Environmental Protection. There are in total seven stationary stations situated in Cracow to measure air pollution. These stations are supported continuously by one semi-mobile (transportable) station. It allows to modify periodically the area under investigation and therefore the 3-dimensional picture of creation and distribution of air pollutants within Cracowmore » area could be more intelligible.« less

  6. Space Shuttle Orbiter thermal protection system design and flight experience

    NASA Technical Reports Server (NTRS)

    Curry, Donald M.

    1993-01-01

    The Space Shuttle Orbiter Thermal Protection System materials, design approaches associated with each material, and the operational performance experienced during fifty-five successful flights are described. The flights to date indicate that the thermal and structural design requirements were met and that the overall performance was outstanding.

  7. Security Management Strategies for Protecting Your Library's Network.

    ERIC Educational Resources Information Center

    Ives, David J.

    1996-01-01

    Presents security procedures for protecting a library's computer system from potential threats by patrons or personnel, and describes how security can be breached. A sidebar identifies four areas of concern in security management: the hardware, the operating system, the network, and the user interface. A selected bibliography of sources on…

  8. 40 CFR 280.42 - Requirements for hazardous substance UST systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... UST systems. 280.42 Section 280.42 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... automatic line leak detector in accordance with § 280.44(a). (5) Other methods of release detection may be used if owners and operators: (i) Demonstrate to the implementing agency that an alternate method can...

  9. 40 CFR 170.240 - Personal protective equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-resistant footwear with sufficient durability and a tread appropriate for wear in rough terrain is not... using a closed system to mix or load pesticides with a signal word of DANGER or WARNING may substitute a... operates under pressure shall wear protective eyewear. (iv) Persons using a closed system shall have all...

  10. 40 CFR 170.240 - Personal protective equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-resistant footwear with sufficient durability and a tread appropriate for wear in rough terrain is not... using a closed system to mix or load pesticides with a signal word of DANGER or WARNING may substitute a... operates under pressure shall wear protective eyewear. (iv) Persons using a closed system shall have all...

  11. 40 CFR 170.240 - Personal protective equipment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-resistant footwear with sufficient durability and a tread appropriate for wear in rough terrain is not... using a closed system to mix or load pesticides with a signal word of DANGER or WARNING may substitute a... operates under pressure shall wear protective eyewear. (iv) Persons using a closed system shall have all...

  12. 40 CFR 60.256 - Continuous monitoring requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....256 Section 60.256 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... rates of 25 Mg (28 tons) per year or more, a bag leak detection system according to the requirements in... performance test on an operating day average basis. (c) Each bag leak detection system used to comply with...

  13. 40 CFR 60.256 - Continuous monitoring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....256 Section 60.256 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... rates of 25 Mg (28 tons) per year or more, a bag leak detection system according to the requirements in... performance test on an operating day average basis. (c) Each bag leak detection system used to comply with...

  14. 40 CFR 60.256 - Continuous monitoring requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....256 Section 60.256 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... rates of 25 Mg (28 tons) per year or more, a bag leak detection system according to the requirements in... performance test on an operating day average basis. (c) Each bag leak detection system used to comply with...

  15. 40 CFR 60.256 - Continuous monitoring requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....256 Section 60.256 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... rates of 25 Mg (28 tons) per year or more, a bag leak detection system according to the requirements in... performance test on an operating day average basis. (c) Each bag leak detection system used to comply with...

  16. Liquid and Gaseous Waste Operations Department annual operating report CY 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maddox, J.J.; Scott, C.B.

    1997-03-01

    This annual report summarizes operating activities dealing with the process waste system, the liquid low-level waste system, and the gaseous waste system. It also describes upgrade activities dealing with the process and liquid low-level waste systems, the cathodic protection system, a stack ventilation system, and configuration control. Maintenance activities are described dealing with nonradiological wastewater treatment plant, process waste treatment plant and collection system, liquid low-level waste system, and gaseous waste system. Miscellaneous activities include training, audits/reviews/tours, and environmental restoration support.

  17. 40 CFR 60.1760 - What is required for my continuous opacity monitoring system and how are the data used?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... opacity monitoring system and how are the data used? 60.1760 Section 60.1760 Protection of Environment... continuous opacity monitoring system and how are the data used? (a) Install, calibrate, maintain, and operate a continuous opacity monitoring system. (b) Install, evaluate, and operate each continuous opacity...

  18. 40 CFR 62.15215 - What is required for my continuous opacity monitoring system and how are the data used?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... opacity monitoring system and how are the data used? 62.15215 Section 62.15215 Protection of Environment... required for my continuous opacity monitoring system and how are the data used? (a) Install, calibrate, maintain, and operate a continuous opacity monitoring system. (b) Install, evaluate, and operate each...

  19. A novel plant protection strategy for transient reactors

    NASA Astrophysics Data System (ADS)

    Bhattacharyya, Samit K.; Lipinski, Walter C.; Hanan, Nelson A.

    The present plant protection system (PPS) has been defined for use in the TREAT-upgrade (TU) reactor for controlled transient operation of reactor-fuel behavior testing under simulated reactor-accident conditions. A PPS with energy-dependent trip set points lowered worst-case clad temperatures by as much as 180 K, relative to the use of conventional fixed-level trip set points. The multilayered multilevel protection strategy represents the state-of-the-art in terrestrial transient reactor protection systems, and should be applicable to multi-MW space reactors.

  20. Long distance high power optical laser fiber break detection and continuity monitoring systems and methods

    DOEpatents

    Rinzler, Charles C.; Gray, William C.; Faircloth, Brian O.; Zediker, Mark S.

    2016-02-23

    A monitoring and detection system for use on high power laser systems, long distance high power laser systems and tools for performing high power laser operations. In particular, the monitoring and detection systems provide break detection and continuity protection for performing high power laser operations on, and in, remote and difficult to access locations.

  1. 49 CFR Appendix E to Part 238 - General Principles of Reliability-Based Maintenance Programs

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... that have already occurred but were not evident to the operating crew. (b) Components or systems in a... shows decreasing reliability with increasing operating age. An age/time limit may be used to reduce the... maintenance of a component or system to protect the safety and operating capability of the equipment, a number...

  2. 49 CFR Appendix E to Part 238 - General Principles of Reliability-Based Maintenance Programs

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... that have already occurred but were not evident to the operating crew. (b) Components or systems in a... shows decreasing reliability with increasing operating age. An age/time limit may be used to reduce the... maintenance of a component or system to protect the safety and operating capability of the equipment, a number...

  3. 49 CFR Appendix E to Part 238 - General Principles of Reliability-Based Maintenance Programs

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... that have already occurred but were not evident to the operating crew. (b) Components or systems in a... shows decreasing reliability with increasing operating age. An age/time limit may be used to reduce the... maintenance of a component or system to protect the safety and operating capability of the equipment, a number...

  4. 49 CFR Appendix E to Part 238 - General Principles of Reliability-Based Maintenance Programs

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... that have already occurred but were not evident to the operating crew. (b) Components or systems in a... shows decreasing reliability with increasing operating age. An age/time limit may be used to reduce the... maintenance of a component or system to protect the safety and operating capability of the equipment, a number...

  5. 40 CFR 264.73 - Operating record.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... System, Recordkeeping, and Reporting § 264.73 Operating record. (a) The owner or operator must keep a written operating record at his facility. (b) The following information must be recorded, as it becomes... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Operating record. 264.73 Section 264...

  6. Crossed SMPS MOSFET-based protection circuit for high frequency ultrasound transceivers and transducers

    PubMed Central

    2014-01-01

    Background The ultrasonic transducer is one of the core components of ultrasound systems, and the transducer’s sensitivity is significantly related the loss of electronic components such as the transmitter, receiver, and protection circuit. In an ultrasonic device, protection circuits are commonly used to isolate the electrical noise between an ultrasound transmitter and transducer and to minimize unwanted discharged pulses in order to protect the ultrasound receiver. However, the performance of the protection circuit and transceiver obviously degrade as the operating frequency or voltage increases. We therefore developed a crossed SMPS (Switching Mode Power Supply) MOSFET-based protection circuit in order to maximize the sensitivity of high frequency transducers in ultrasound systems. The high frequency pulse signals need to trigger the transducer, and high frequency pulse signals must be received by the transducer. We therefore selected the SMPS MOSFET, which is the main component of the protection circuit, to minimize the loss in high frequency operation. The crossed configuration of the protection circuit can drive balanced bipolar high voltage signals from the pulser and transfer the balanced low voltage echo signals from the transducer. Methods The equivalent circuit models of the SMPS MOSFET-based protection circuit are shown in order to select the proper device components. The schematic diagram and operation mechanism of the protection circuit is provided to show how the protection circuit is constructed. The P-Spice circuit simulation was also performed in order to estimate the performance of the crossed MOSFET-based protection circuit. Results We compared the performance of our crossed SMPS MOSFET-based protection circuit with a commercial diode-based protection circuit. At 60 MHz, our expander and limiter circuits have lower insertion loss than the commercial diode-based circuits. The pulse-echo test is typical method to evaluate the sensitivity of ultrasonic transducers. Therefore, we performed a pulse-echo test using a single element transducer in order to utilize the crossed SMPS MOSFET-based protection circuit in an ultrasound system. Conclusions The SMPS-based protection circuit could be a viable alternative that provides better sensitivity, especially for high frequency ultrasound applications. PMID:24924595

  7. Crossed SMPS MOSFET-based protection circuit for high frequency ultrasound transceivers and transducers.

    PubMed

    Choi, Hojong; Shung, K Kirk

    2014-06-12

    The ultrasonic transducer is one of the core components of ultrasound systems, and the transducer's sensitivity is significantly related the loss of electronic components such as the transmitter, receiver, and protection circuit. In an ultrasonic device, protection circuits are commonly used to isolate the electrical noise between an ultrasound transmitter and transducer and to minimize unwanted discharged pulses in order to protect the ultrasound receiver. However, the performance of the protection circuit and transceiver obviously degrade as the operating frequency or voltage increases. We therefore developed a crossed SMPS (Switching Mode Power Supply) MOSFET-based protection circuit in order to maximize the sensitivity of high frequency transducers in ultrasound systems.The high frequency pulse signals need to trigger the transducer, and high frequency pulse signals must be received by the transducer. We therefore selected the SMPS MOSFET, which is the main component of the protection circuit, to minimize the loss in high frequency operation. The crossed configuration of the protection circuit can drive balanced bipolar high voltage signals from the pulser and transfer the balanced low voltage echo signals from the transducer. The equivalent circuit models of the SMPS MOSFET-based protection circuit are shown in order to select the proper device components. The schematic diagram and operation mechanism of the protection circuit is provided to show how the protection circuit is constructed. The P-Spice circuit simulation was also performed in order to estimate the performance of the crossed MOSFET-based protection circuit. We compared the performance of our crossed SMPS MOSFET-based protection circuit with a commercial diode-based protection circuit. At 60 MHz, our expander and limiter circuits have lower insertion loss than the commercial diode-based circuits. The pulse-echo test is typical method to evaluate the sensitivity of ultrasonic transducers. Therefore, we performed a pulse-echo test using a single element transducer in order to utilize the crossed SMPS MOSFET-based protection circuit in an ultrasound system. The SMPS-based protection circuit could be a viable alternative that provides better sensitivity, especially for high frequency ultrasound applications.

  8. Technology development of the Space Transportation System mission and terrestrial applications of satellite technology

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The Space Transportation System (STS) is discussed, including the launch processing system, the thermal protection subsystem, meteorological research, sound supression water system, rotating service structure, improved hypergol or removal systems, fiber optics research, precision positioning, remote controlled solid rocket booster nozzle plugs, ground operations for Centaur orbital transfer vehicle, parachute drying, STS hazardous waste disposal and recycle, toxic waste technology and control concepts, fast analytical densitometry study, shuttle inventory management system, operational intercommunications system improvement, and protective garment ensemble. Terrestrial applications are also covered, including LANDSAT applications to water resources, satellite freeze forecast system, application of ground penetrating radar to soil survey, turtle tracking, evaluating computer drawn ground cover maps, sparkless load pulsar, and coupling a microcomputer and computing integrator with a gas chromatograph.

  9. Applications of Intelligent Technology to Power System Supervisory Control and Protection Systems

    NASA Astrophysics Data System (ADS)

    Nagata, Takeshi

    Power system supervisory control and protection systems provide utilities with capabilities that are key to a planning business function, i.e., delivering power in a reliable and safe manner. A quality system solution is central to effective operation of a utility's most critical and costly generation, transmission, and distribution assets. The challenging issues for these systems today are not the same as they were few years ago. Today, there is much more placed on integration, use of new IT technologies, and access to information for more purposes. This article presents the topics of intelligent technology to the power system supervisory control and protection systems.

  10. Delta nitrogen tetroxide fueling operations

    NASA Technical Reports Server (NTRS)

    Grigsby, R. B.; Cross, T. M.; Rucci, T. D.

    1978-01-01

    The development of the Delta second stage nitrogen tetroxide fueling system is briefly summarized. The nitrogen tetroxide fueling system and the equipment used to protect the spacecraft environment from the toxic nitrogen tetroxide fumes are described. Topics covered include: the nitrogen tetroxide transfer system; loading operations; safety precautions; and chemical treatment of all toxic vapors.

  11. 10 CFR 60.131 - General design criteria for the geologic repository operations area.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., systems, and components important to safety shall be designed to withstand dynamic effects such as missile... radioactivity areas; and (6) A radiation alarm system to warn of significant increases in radiation levels... system shall be designed with provisions for calibration and for testing its operability. (b) Protection...

  12. Overload protection system

    NASA Technical Reports Server (NTRS)

    Nagano, S.

    1979-01-01

    Overload protection circuit utilizes one circuit for suspending inverter action when load abnormality is detected and second circuit to monitor clearance of abnormality. Device wastes no power during normal operating conditions and responds instantaneously when abnormality is cleared.

  13. 29 CFR Appendix A to Subpart M of... - Determining Roof Widths

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Fall Protection Pt. 1926... monitoring system alone as a means of providing fall protection during the performance of roofing operations...

  14. 29 CFR Appendix A to Subpart M of... - Determining Roof Widths

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Fall Protection Pt. 1926... monitoring system alone as a means of providing fall protection during the performance of roofing operations...

  15. 29 CFR Appendix A to Subpart M of... - Determining Roof Widths

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Fall Protection Pt. 1926... monitoring system alone as a means of providing fall protection during the performance of roofing operations...

  16. 29 CFR Appendix A to Subpart M of... - Determining Roof Widths

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Fall Protection Pt. 1926... monitoring system alone as a means of providing fall protection during the performance of roofing operations...

  17. 29 CFR Appendix A to Subpart M of... - Determining Roof Widths

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Fall Protection Pt. 1926... monitoring system alone as a means of providing fall protection during the performance of roofing operations...

  18. Unmanned ground vehicles for integrated force protection

    NASA Astrophysics Data System (ADS)

    Carroll, Daniel M.; Mikell, Kenneth; Denewiler, Thomas

    2004-09-01

    The combination of Command and Control (C2) systems with Unmanned Ground Vehicles (UGVs) provides Integrated Force Protection from the Robotic Operation Command Center. Autonomous UGVs are directed as Force Projection units. UGV payloads and fixed sensors provide situational awareness while unattended munitions provide a less-than-lethal response capability. Remote resources serve as automated interfaces to legacy physical devices such as manned response vehicles, barrier gates, fence openings, garage doors, and remote power on/off capability for unmanned systems. The Robotic Operations Command Center executes the Multiple Resource Host Architecture (MRHA) to simultaneously control heterogeneous unmanned systems. The MRHA graphically displays video, map, and status for each resource using wireless digital communications for integrated data, video, and audio. Events are prioritized and the user is prompted with audio alerts and text instructions for alarms and warnings. A control hierarchy of missions and duty rosters support autonomous operations. This paper provides an overview of the key technology enablers for Integrated Force Protection with details on a force-on-force scenario to test and demonstrate concept of operations using Unmanned Ground Vehicles. Special attention is given to development and applications for the Remote Detection Challenge and Response (REDCAR) initiative for Integrated Base Defense.

  19. A digital protection system incorporating knowledge based learning

    NASA Astrophysics Data System (ADS)

    Watson, Karan; Russell, B. Don; McCall, Kurt

    A digital system architecture used to diagnoses the operating state and health of electric distribution lines and to generate actions for line protection is presented. The architecture is described functionally and to a limited extent at the hardware level. This architecture incorporates multiple analysis and fault-detection techniques utilizing a variety of parameters. In addition, a knowledge-based decision maker, a long-term memory retention and recall scheme, and a learning environment are described. Preliminary laboratory implementations of the system elements have been completed. Enhanced protection for electric distribution feeders is provided by this system. Advantages of the system are enumerated.

  20. Air cleaning performance of a new environmentally controlled primary crusher operator booth

    PubMed Central

    Organiscak, J.A.; Cecala, A.B.; Zimmer, J.A.; Holen, B.; Baregi, J.R.

    2016-01-01

    The National Institute for Occupational Safety and Health (NIOSH) cooperated with 3M Company in the design and testing of a new environmentally controlled primary crusher operator booth at the company’s Wausau granite quarry near Wausau, WI. This quarry had an older crusher booth without a central heating, ventilation and air conditioning (HVAC) system, and without an air filtration and pressurization system. A new replacement operator booth was designed and installed by 3M based on design considerations from past NIOSH research on enclosed cab filtration systems. NIOSH conducted pre-testing of the old booth and post-testing of the new booth to assess the new filtration and pressurization system’s effectiveness in controlling airborne dusts and particulates. The booth’s dust and particulate control effectiveness is described by its protection factor, expressed as a ratio of the outside to inside concentrations measured during testing. Results indicate that the old booth provided negligible airborne respirable dust protection and low particulate protection from the outside environment. The newly installed booth provided average respirable dust protection factors from 2 to 25 over five shifts of dust sampling with occasional worker ingress and egress from the booth, allowing some unfiltered contaminants to enter the enclosure. Shorter-term particle count testing outside and inside the booth under near-steady-state conditions, with no workers entering or exiting the booth, resulted in protection factors from 35 to 127 on 0.3- to 1.0-μm respirable size particulates under various HVAC airflow operating conditions. PMID:26937052

  1. Recent developments in aircraft protection systems for laser guide star operations

    NASA Astrophysics Data System (ADS)

    Stomski, Paul J.; Murphy, Thomas W.; Campbell, Randy

    2012-07-01

    The astronomical community's use of high power laser guide star adaptive optics (LGS-AO) systems presents a potential hazard to aviation. Historically, the most common and trusted means of protecting aircraft and their occupants has been the use of safety observers (aka spotters) armed with shut-off switches. These safety observers watch for aircraft at risk and terminate laser propagation before the aircraft can be adversely affected by the laser. Efforts to develop safer and more cost-effective automated aircraft protection systems for use by the astronomical community have been inhibited by both technological and regulatory challenges. This paper discusses recent developments in these two areas. Specifically, with regard to regulation and guidance we discuss the 2011 release of AS-6029 by the SAE as well as the potential impact of RTCA DO-278A. With regard to the recent developments in the technology used to protect aircraft from laser illumination, we discuss the novel Transponder Based Aircraft Detection (TBAD) system being installed at W. M. Keck Observatory (WMKO). Finally, we discuss our strategy for evaluating TBAD compliance with the regulations and for seeking appropriate approvals for LGS operations at WMKO using a fully automated, flexibly configured, multi-tier aircraft protection system incorporating this new technology.

  2. 45 CFR 1386.23 - Periodic reports: Protection and Advocacy System.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... advocacy work and training activities, and the outcomes which it strives to accomplish. (2) Where applicable, the SOP must include a description of how the Protection and Advocacy System operates and how it... for assistance when it is outside the scope of the SOP but they must inform individuals that this is...

  3. 45 CFR 1386.23 - Periodic reports: Protection and Advocacy System.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... advocacy work and training activities, and the outcomes which it strives to accomplish. (2) Where applicable, the SOP must include a description of how the Protection and Advocacy System operates and how it... for assistance when it is outside the scope of the SOP but they must inform individuals that this is...

  4. 45 CFR 1386.23 - Periodic reports: Protection and Advocacy System.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... advocacy work and training activities, and the outcomes which it strives to accomplish. (2) Where applicable, the SOP must include a description of how the Protection and Advocacy System operates and how it... for assistance when it is outside the scope of the SOP but they must inform individuals that this is...

  5. 45 CFR 1386.23 - Periodic reports: Protection and Advocacy System.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... advocacy work and training activities, and the outcomes which it strives to accomplish. (2) Where applicable, the SOP must include a description of how the Protection and Advocacy System operates and how it... for assistance when it is outside the scope of the SOP but they must inform individuals that this is...

  6. 40 CFR 53.42 - Generation of test atmospheres for wind tunnel tests.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... tunnel tests. 53.42 Section 53.42 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... particle delivery system shall consist of a blower system and a wind tunnel having a test section of... particles delivered to the test section of the wind tunnel shall be established using the operating...

  7. 40 CFR 53.42 - Generation of test atmospheres for wind tunnel tests.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... tunnel tests. 53.42 Section 53.42 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... particle delivery system shall consist of a blower system and a wind tunnel having a test section of... particles delivered to the test section of the wind tunnel shall be established using the operating...

  8. 40 CFR 53.42 - Generation of test atmospheres for wind tunnel tests.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... tunnel tests. 53.42 Section 53.42 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... particle delivery system shall consist of a blower system and a wind tunnel having a test section of... particles delivered to the test section of the wind tunnel shall be established using the operating...

  9. 48 CFR 3009.171 - Prohibition on Federal Protective Service guard services contracts with business concerns owned...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Prohibition on Federal Protective Service guard services contracts with business concerns owned, controlled, or operated by an individual convicted of a felony. 3009.171 Section 3009.171 Federal Acquisition Regulations System DEPARTMENT...

  10. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... system will operate properly if offsite power is lost and shall verify that the computer has security... system to assure that the requirements in § 36.35 are met for protection of the source rack and the... protection. For panoramic irradiators, the licensee shall test the ability of the heat and smoke detectors to...

  11. Security Considerations of Doing Business via the Internet: Cautions To Be Considered.

    ERIC Educational Resources Information Center

    Aldridge, Alicia; White, Michele; Forcht, Karen

    1997-01-01

    Lack of security is perceived as a major roadblock to doing business online. This article examines system, user, and commercial transaction privacy on the World Wide Web and discusses methods of protection: operating systems security, file and data protection, user education, access restrictions, data authentication, perimeter and transaction…

  12. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... system will operate properly if offsite power is lost and shall verify that the computer has security... system to assure that the requirements in § 36.35 are met for protection of the source rack and the... protection. For panoramic irradiators, the licensee shall test the ability of the heat and smoke detectors to...

  13. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... system will operate properly if offsite power is lost and shall verify that the computer has security... system to assure that the requirements in § 36.35 are met for protection of the source rack and the... protection. For panoramic irradiators, the licensee shall test the ability of the heat and smoke detectors to...

  14. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... system will operate properly if offsite power is lost and shall verify that the computer has security... system to assure that the requirements in § 36.35 are met for protection of the source rack and the... protection. For panoramic irradiators, the licensee shall test the ability of the heat and smoke detectors to...

  15. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... system will operate properly if offsite power is lost and shall verify that the computer has security... system to assure that the requirements in § 36.35 are met for protection of the source rack and the... protection. For panoramic irradiators, the licensee shall test the ability of the heat and smoke detectors to...

  16. 49 CFR 393.43 - Breakaway and emergency braking.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... protection system. Every motor vehicle, if used to tow a trailer equipped with brakes, shall be equipped with... protection valve or similar device shall operate automatically when the air pressure on the towing vehicle is... brake systems installed on towed vehicles shall be so designed, by the use of “no-bleed-back” relay...

  17. 49 CFR 393.43 - Breakaway and emergency braking.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... protection system. Every motor vehicle, if used to tow a trailer equipped with brakes, shall be equipped with... protection valve or similar device shall operate automatically when the air pressure on the towing vehicle is... brake systems installed on towed vehicles shall be so designed, by the use of “no-bleed-back” relay...

  18. Design and evaluation of safety operation VR training system for robotic catheter surgery.

    PubMed

    Wang, Yu; Guo, Shuxiang; Li, Yaxin; Tamiya, Takashi; Song, Yu

    2018-01-01

    A number of remote robotic catheter systems have been developed to protect physicians from X-ray exposure in endovascular surgery. However, the teleoperation prevents the physicians sensing the force directly which may easily result in healthy vessels injured. To realize the safe operation, a tissue protection-based VR training system has been developed in this paper to prevent collateral damage by collision. The integrated VR simulator cannot only remind the novice possible collisions by visual signs, but also cooperate with the newly designed tissue protection mechanism to remit collision trauma beforehand. Such mechanism exploits the diameter variable pulley in order to implement the safe interaction between catheter and vasculature. To testify the effectiveness of the tissue protection in training system, we invited four non-medical students to participate the successive 5 days training session. The evaluation results show that the average impingement distance (representing tissue damage) to vascular wall has been reduced to 0.6 mm, and the collision frequency is greatly decreased which implies the realization of relative safe catheterization.

  19. 78 FR 56980 - Muscle Shoals Reservation Redevelopment, Colbert County, Alabama

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-16

    ... protect the integrated operation of TVA reservoir and power systems, to provide for appropriate public use and enjoyment of the reservoir system, and to provide for continuing economic growth in the Tennessee... specific use agreements, such as easements. Because of environmental and reservoir operations constraints...

  20. Locomotive cab occupant protection

    DOT National Transportation Integrated Search

    2003-11-15

    The effectiveness of fitting a locomotive cab with a passive inflatable restraint system utilizing inflatable structures, and interior padding to protect the operator has been evaluated for the in-line collision scenario. It is a challenge to design ...

  1. Towards an autonomous sensor architecture for persistent area protection

    NASA Astrophysics Data System (ADS)

    Thomas, Paul A.; Marshall, Gillian F.; Stubbins, Daniel J.; Faulkner, David A.

    2016-10-01

    The majority of sensor installations for area protection (e.g. critical national infrastructure, military forward operating bases, etc.) make use of banks of screens each containing one or more sensor feeds, such that the burden of combining data from the various sources, understanding the situation, and controlling the sensors all lies with the human operator. Any automation in the system is generally heavily bespoke for the particular installation, leading to an inflexible system which is difficult to change or upgrade. We have developed a modular system architecture consisting of intelligent autonomous sensor modules, a high level decision making module, a middleware integration layer and an end-user GUI. The modules are all effectively "plug and play", and we have demonstrated that it is relatively simple to incorporate legacy sensors into the architecture. We have extended our previously-reported SAPIENT demonstration system to operate with a larger number and variety of sensor modules, over an extended area, detecting and classifying a wider variety of "threat activities", both vehicular and pedestrian. We report the results of a demonstration of the SAPIENT system containing multiple autonomous sensor modules with a range of modalities including laser scanners, radar, TI, EO, acoustic and seismic sensors. They operate from a combination of mains, generator and battery power, and communicate with the central "hub" over Ethernet, point-to-point wireless links and Wi-Fi. The system has been configured to protect an extended area in a complex semi-urban environment. We discuss the operation of the SAPIENT system in a realistic demonstration environment (which included significant activity not under trial control), showing sensor cueing, multi-modal sensor fusion, threat prioritisation and target hand-off.

  2. Design and operation of the quench protection system for the Fermilab Tevatron

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martin, P.S.

    1986-05-01

    A method is required to protect the magnets of a superconducting accelerator from possible overheating or overvoltage conditions in the event that some magnets quench, that is, are elevated in temperature such that they are no longer superconducting. A brief discussion of the basic properties of superconductors and the phenomenon of quench propagation is given, followed by the configuration of a quench protection system for the Fermilab Tevatron. (LEW)

  3. 150 KVA Samarium Cobalt VSCF Starter Generator Electrical System

    DTIC Science & Technology

    1978-12-01

    also has protective circuits to limit damage to the system in evpnt tif failure. During normal operation , the system either starts up automatically when...determined during operation due to the external til loop . 4.2. 1. 1. 11 Temperature Sensor Four copper constantan thermocouples are located in stator...design and part of the vibration problem being experienced can be attributed to the shaft critical being too close to the top operating ,)eed range

  4. Power system monitoring and source control of the Space Station Freedom DC power system testbed

    NASA Technical Reports Server (NTRS)

    Kimnach, Greg L.; Baez, Anastacio N.

    1992-01-01

    Unlike a terrestrial electric utility which can purchase power from a neighboring utility, the Space Station Freedom (SSF) has strictly limited energy resources; as a result, source control, system monitoring, system protection, and load management are essential to the safe and efficient operation of the SSF Electric Power System (EPS). These functions are being evaluated in the DC Power Management and Distribution (PMAD) Testbed which NASA LeRC has developed at the Power System Facility (PSF) located in Cleveland, Ohio. The testbed is an ideal platform to develop, integrate, and verify power system monitoring and control algorithms. State Estimation (SE) is a monitoring tool used extensively in terrestrial electric utilities to ensure safe power system operation. It uses redundant system information to calculate the actual state of the EPS, to isolate faulty sensors, to determine source operating points, to verify faults detected by subsidiary controllers, and to identify high impedance faults. Source control and monitoring safeguard the power generation and storage subsystems and ensure that the power system operates within safe limits while satisfying user demands with minimal interruptions. System monitoring functions, in coordination with hardware implemented schemes, provide for a complete fault protection system. The objective of this paper is to overview the development and integration of the state estimator and the source control algorithms.

  5. Power system monitoring and source control of the Space Station Freedom dc-power system testbed

    NASA Technical Reports Server (NTRS)

    Kimnach, Greg L.; Baez, Anastacio N.

    1992-01-01

    Unlike a terrestrial electric utility which can purchase power from a neighboring utility, the Space Station Freedom (SSF) has strictly limited energy resources; as a result, source control, system monitoring, system protection, and load management are essential to the safe and efficient operation of the SSF Electric Power System (EPS). These functions are being evaluated in the dc Power Management and Distribution (PMAD) Testbed which NASA LeRC has developed at the Power System Facility (PSF) located in Cleveland, Ohio. The testbed is an ideal platform to develop, integrate, and verify power system monitoring and control algorithms. State Estimation (SE) is a monitoring tool used extensively in terrestrial electric utilities to ensure safe power system operation. It uses redundant system information to calculate the actual state of the EPS, to isolate faulty sensors, to determine source operating points, to verify faults detected by subsidiary controllers, and to identify high impedance faults. Source control and monitoring safeguard the power generation and storage subsystems and ensure that the power system operates within safe limits while satisfying user demands with minimal interruptions. System monitoring functions, in coordination with hardware implemented schemes, provide for a complete fault protection system. The objective of this paper is to overview the development and integration of the state estimator and the source control algorithms.

  6. 47 CFR 78.51 - Remote control operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... control system shall be installed and protected in a manner designed to prevent tampering or operation by... transmissions and a carrier operated device which will give a continuous visual indication whenever the... necessary to insure proper operation. (4) The control circuits shall be so designed and installed that short...

  7. 47 CFR 78.51 - Remote control operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... control system shall be installed and protected in a manner designed to prevent tampering or operation by... transmissions and a carrier operated device which will give a continuous visual indication whenever the... necessary to insure proper operation. (4) The control circuits shall be so designed and installed that short...

  8. 40 CFR 75.13 - Specific provisions for monitoring CO2 emissions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Specific provisions for monitoring CO2... monitoring CO2 emissions. (a) CO 2 continuous emission monitoring system. If the owner or operator chooses to... operating requirements in § 75.10 for a CO2 continuous emission monitoring system and flow monitoring system...

  9. 40 CFR 75.13 - Specific provisions for monitoring CO2 emissions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 16 2011-07-01 2011-07-01 false Specific provisions for monitoring CO2... monitoring CO2 emissions. (a) CO 2 continuous emission monitoring system. If the owner or operator chooses to... operating requirements in § 75.10 for a CO2 continuous emission monitoring system and flow monitoring system...

  10. 40 CFR 75.13 - Specific provisions for monitoring CO2 emissions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 17 2012-07-01 2012-07-01 false Specific provisions for monitoring CO2... monitoring CO2 emissions. (a) CO 2 continuous emission monitoring system. If the owner or operator chooses to... operating requirements in § 75.10 for a CO2 continuous emission monitoring system and flow monitoring system...

  11. Reliable inverter systems

    NASA Technical Reports Server (NTRS)

    Nagano, S.

    1979-01-01

    Base driver with common-load-current feedback protects paralleled inverter systems from open or short circuits. Circuit eliminates total system oscillation that can occur in conventional inverters because of open circuit in primary transformer winding. Common feedback signal produced by functioning modules forces operating frequency of failed module to coincide with clock drive so module resumes normal operating frequency in spite of open circuit.

  12. Development of a helmet-mounted PLZT thermal/flash protection system. [Protective goggles

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harris, J.O. Jr.; Cutchen, J.T.; Pfoff, B.J.

    1976-01-01

    Sandia Laboratories is developing PLZT thermal/flash protective devices (TFPD's) goggles to prevent exposure and resultant eye damage from nuclear weapon detonations. The primary emphasis of the present program is to transfer technology and establish production capability for helmet-mounted PLZT/TFPD goggles for USAF flight crews, with a non-helmet-mounted configuration to follow. The first production units are anticipated in the fall of 1977. The operating principles of the PLZT/TFPD goggle device are briefly outlined, and the device configuration and operational characteristics are described.

  13. Radiation exposure to the operator performing cardiac angiography with U-arm systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Balter, S.; Sones, F.M. Jr.; Brancato, R.

    The radiation exposure received by a group of operators performing 700 coronary angiograms was measured using the brachial artery approach and the Philips Cardio Diagnost. Nineteen sites were monitored on each operator, using lithium fluoride thermoluminescent dosimeters. Four hundred examinations were performed with a table-mounted protective shield in place. Three hundred were performed without the shield. The average exposures (in mR per study) with and without the shield were 1.9/6 for the eyes and 1.4/8.3 for the thyroid. The resulting operator exposure with the shield in place is low enough so that an operator performing 25 procedures per week onmore » a continuous basis will not exceed the recommendations of the National Commission on Radiological Protection and Units. We therefore strongly recommend the use of properly designed and appropriately positioned shield with all U-arm systems.« less

  14. Radiation exposure to the operator performing cardiac angiography with U-arm systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Balter, S.; Sones, F.M. Jr.; Brancato, R.

    We measured the radiation exposure received by a group of operators performing 700 coronary angiograms. All studies were performed using the brachial artery approach and the Philips Cardio Diagnost. Nineteen sites were monitored on each operator, using lithium fluoride thermoluminescent dosimeters. Four hundred examinations were performed with a table-mounted protective shield in place. Three hundred were performed without the shield. The averge exposures (in mR per study) with and without the shield were 1.9/6 for the eyes and 1.4/8.3 for the thyroid. The resulting operator exposure with the shield in place is low enough so that an operator performing 25more » procedures per week on a continuous basis will not exceed the recommendations of the National Commission on Radiological Protection and Units. We therefore strongly recommend the use of properly designed and appropriately positioned shield with all U-arm systems.« less

  15. Protection coordination of the Kennedy Space Center electric distribution network

    NASA Technical Reports Server (NTRS)

    1976-01-01

    A computer technique is described for visualizing the coordination and protection of any existing system of devices and settings by plotting the tripping characteristics of the involved devices on a common basis. The program determines the optimum settings of a given set of protective devices and configuration in the sense of the best expected coordinated operation of these devices. Subroutines are given for simulating time versus current characteristics of the different relays, circuit breakers, and fuses in the system; coordination index computation; protection checks; plotting; and coordination optimation.

  16. 76 FR 65431 - National Pollutant Discharge Elimination System (NPDES) Concentrated Animal Feeding Operation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-21

    ...-AF22 National Pollutant Discharge Elimination System (NPDES) Concentrated Animal Feeding Operation... co-proposes two options for obtaining basic information from CAFOs to support EPA in meeting its water quality protection responsibilities under the Clean Water Act (CWA). The purpose of this co...

  17. 40 CFR 52.1183 - Visibility protection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Regulation for visibility monitoring and new source review. The provisions of §§ 52.26 and 52.28 are hereby... Cement facility located in Charlevoix, Michigan, shall operate continuous emission monitoring systems to... section shall be use of a continuous emission monitoring system operated in conformance with 40 CFR part...

  18. 46 CFR 76.33-20 - Operation and installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... EQUIPMENT Smoke Detecting System, Details § 76.33-20 Operation and installation. (a) The system shall be so arranged and installed that the presence of smoke in any of the protected spaces will automatically be... automatically indicate the zone in which the smoke originated. The detecting cabinet shall normally be located...

  19. 46 CFR 76.33-20 - Operation and installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... EQUIPMENT Smoke Detecting System, Details § 76.33-20 Operation and installation. (a) The system shall be so arranged and installed that the presence of smoke in any of the protected spaces will automatically be... automatically indicate the zone in which the smoke originated. The detecting cabinet shall normally be located...

  20. 46 CFR 76.33-20 - Operation and installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... EQUIPMENT Smoke Detecting System, Details § 76.33-20 Operation and installation. (a) The system shall be so arranged and installed that the presence of smoke in any of the protected spaces will automatically be... automatically indicate the zone in which the smoke originated. The detecting cabinet shall normally be located...

  1. 46 CFR 76.33-20 - Operation and installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... EQUIPMENT Smoke Detecting System, Details § 76.33-20 Operation and installation. (a) The system shall be so arranged and installed that the presence of smoke in any of the protected spaces will automatically be... automatically indicate the zone in which the smoke originated. The detecting cabinet shall normally be located...

  2. 40 CFR 142.307 - What terms and conditions must be included in a small system variance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that may affect proper and effective operation and maintenance of the technology; (2) Monitoring... effective installation, operation and maintenance of the applicable small system variance technology in... health, which may include: (i) Public education requirements; and (ii) Source water protection...

  3. Space station operations task force. Panel 2 report: Ground operations and support systems

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The Ground Operations Concept embodied in this report provides for safe multi-user utilization of the Space Station, eases user integration, and gives users autonomy and flexibility. It provides for meaningful multi-national participation while protecting U.S. interests. The concept also supports continued space operations technology development by maintaining NASA expertise and enabling technology evolution. Given attention here are pre/post flight operations, logistics, sustaining engineering/configuration management, transportation services/rescue, and information systems and communication.

  4. Research on numerical simulation and protection of transient process in long-distance slurry transportation pipelines

    NASA Astrophysics Data System (ADS)

    Lan, G.; Jiang, J.; Li, D. D.; Yi, W. S.; Zhao, Z.; Nie, L. N.

    2013-12-01

    The calculation of water-hammer pressure phenomenon of single-phase liquid is already more mature for a pipeline of uniform characteristics, but less research has addressed the calculation of slurry water hammer pressure in complex pipelines with slurry flows carrying solid particles. In this paper, based on the developments of slurry pipelines at home and abroad, the fundamental principle and method of numerical simulation of transient processes are presented, and several boundary conditions are given. Through the numerical simulation and analysis of transient processes of a practical engineering of long-distance slurry transportation pipeline system, effective protection measures and operating suggestions are presented. A model for calculating the water impact of solid and fluid phases is established based on a practical engineering of long-distance slurry pipeline transportation system. After performing a numerical simulation of the transient process, analyzing and comparing the results, effective protection measures and operating advice are recommended, which has guiding significance to the design and operating management of practical engineering of longdistance slurry pipeline transportation system.

  5. Tailoring NIST Security Controls for the Ground System: Selection and Implementation -- Recommendations for Information System Owners

    NASA Technical Reports Server (NTRS)

    Takamura, Eduardo; Mangum, Kevin

    2016-01-01

    The National Aeronautics and Space Administration (NASA) invests millions of dollars in spacecraft and ground system development, and in mission operations in the pursuit of scientific knowledge of the universe. In recent years, NASA sent a probe to Mars to study the Red Planet's upper atmosphere, obtained high resolution images of Pluto, and it is currently preparing to find new exoplanets, rendezvous with an asteroid, and bring a sample of the asteroid back to Earth for analysis. The success of these missions is enabled by mission assurance. In turn, mission assurance is backed by information assurance. The information systems supporting NASA missions must be reliable as well as secure. NASA - like every other U.S. Federal Government agency - is required to manage the security of its information systems according to federal mandates, the most prominent being the Federal Information Security Management Act (FISMA) of 2002 and the legislative updates that followed it. Like the management of enterprise information technology (IT), federal information security management takes a "one-size fits all" approach for protecting IT systems. While this approach works for most organizations, it does not effectively translate into security of highly specialized systems such as those supporting NASA missions. These systems include command and control (C&C) systems, spacecraft and instrument simulators, and other elements comprising the ground segment. They must be carefully configured, monitored and maintained, sometimes for several years past the missions' initially planned life expectancy, to ensure the ground system is protected and remains operational without any compromise of its confidentiality, integrity and availability. Enterprise policies, processes, procedures and products, if not effectively tailored to meet mission requirements, may not offer the needed security for protecting the information system, and they may even become disruptive to mission operations. Certain protective measures for the general enterprise may not be as efficient within the ground segment. This is what the authors have concluded through observations and analysis of patterns identified from the various security assessments performed on NASA missions such as MAVEN, OSIRIS-REx, New Horizons and TESS, to name a few. The security audits confirmed that the framework for managing information system security developed by the National Institute of Standards and Technology (NIST) for the federal government, and adopted by NASA, is indeed effective. However, the selection of the technical, operational and management security controls offered by the NIST model - and how they are implemented - does not always fit the nature and the environment where the ground system operates in even though there is no apparent impact on mission success. The authors observed that unfit controls, that is, controls that are not necessarily applicable or sufficiently effective in protecting the mission systems, are often selected to facilitate compliance with security requirements and organizational expectations even if the selected controls offer minimum or non-existent protection. This paper identifies some of the standard security controls that can in fact protect the ground system, and which of them offer little or no benefit at all. It offers multiple scenarios from real security audits in which the controls are not effective without, of course, disclosing any sensitive information about the missions assessed. In addition to selection and implementation of controls, the paper also discusses potential impact of recent legislation such as the Federal Information Security Modernization Act (FISMA) of 2014 - aimed at the enterprise - on the ground system, and offers other recommendations to Information System Owners (ISOs).

  6. Cryogenic filters for RFI protection

    NASA Technical Reports Server (NTRS)

    Bautista, J. J.; Petty, S. M.

    1981-01-01

    The increased bandwidth and sensitivity of the DSN maser-based receiver systems along with the increase in worldwide microwave spectrum usage dictated the need for employing additional measures to protect these systems from RFI (radio frequency inerference). Both in-band and out-of-band microwave signals at the input of the Deep Space Network (DSN) traveling wave masers (TWM) can adversely affect the maser performance in a variety of ways. Filters fabricated from superconducting materials operating below their superconducting transition temperature (Tc) possess the most potential for providing the necessary RFI protection without degrading the system performance.

  7. Emulytics for Cyber-Enabled Physical Attack Scenarios: Interim LDRD Report of Year One Results.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clem, John; Urias, Vincent; Atkins, William Dee

    Sandia National Laboratories has funded the research and development of a new capability to interactively explore the effects of cyber exploits on the performance of physical protection systems. This informal, interim report of progress summarizes the project’s basis and year one (of two) accomplishments. It includes descriptions of confirmed cyber exploits against a representative testbed protection system and details the development of an emulytics capability to support live, virtual, and constructive experiments. This work will support stakeholders to better engineer, operate, and maintain reliable protection systems.

  8. A Risk-Based Approach for Aerothermal/TPS Analysis and Testing

    NASA Technical Reports Server (NTRS)

    Wright, Michael J.; Grinstead, Jay H.; Bose, Deepak

    2007-01-01

    The current status of aerothermal and thermal protection system modeling for civilian entry missions is reviewed. For most such missions, the accuracy of our simulations is limited not by the tools and processes currently employed, but rather by reducible deficiencies in the underlying physical models. Improving the accuracy of and reducing the uncertainties in these models will enable a greater understanding of the system level impacts of a particular thermal protection system and of the system operation and risk over the operational life of the system. A strategic plan will be laid out by which key modeling deficiencies can be identified via mission-specific gap analysis. Once these gaps have been identified, the driving component uncertainties are determined via sensitivity analyses. A Monte-Carlo based methodology is presented for physics-based probabilistic uncertainty analysis of aerothermodynamics and thermal protection system material response modeling. These data are then used to advocate for and plan focused testing aimed at reducing key uncertainties. The results of these tests are used to validate or modify existing physical models. Concurrently, a testing methodology is outlined for thermal protection materials. The proposed approach is based on using the results of uncertainty/sensitivity analyses discussed above to tailor ground testing so as to best identify and quantify system performance and risk drivers. A key component of this testing is understanding the relationship between the test and flight environments. No existing ground test facility can simultaneously replicate all aspects of the flight environment, and therefore good models for traceability to flight are critical to ensure a low risk, high reliability thermal protection system design. Finally, the role of flight testing in the overall thermal protection system development strategy is discussed.

  9. 40 CFR 63.1015 - Closed vent systems and control devices; or emissions routed to a fuel gas system or process.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Closed vent systems and control... this part, except as provided in § 63.1002(b). (2) Owners or operators of closed vent systems and... in subpart SS of this part, except as provided in § 63.1002(b). (3) Owners or operators routing...

  10. WORK SAFETY CONDITIONS WITH CLOSED RADIATION SOURCES (in Polish)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brosziewicz, R.

    1963-01-01

    A discussion is presented of principles of radiological protection observed in the Radiation Chemistry Dept. of the Nuclear Research Inst., during operation of large sources of ionizing radiation. It has been revealed that a properly designed servicing system of these sources ensures full protection of personnel even with not fully protected sources. (auth)

  11. 76 FR 48184 - Exelon Nuclear, Peach Bottom Atomic Power Station, Unit 1; Exemption From Certain Security...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-08

    ... nuclear reactor facility. PBAPS Unit 1 was a high-temperature, gas-cooled reactor that was operated from... the safeguards contingency plan.'' Part 73 of 10 CFR, ``Physical Protection of Plant and Materials... physical protection system which will have capabilities for the protection of special nuclear material at...

  12. Damage Detection/Locating System Providing Thermal Protection

    NASA Technical Reports Server (NTRS)

    Woodard, Stanley E. (Inventor); Jones, Thomas W. (Inventor); Taylor, Bryant D. (Inventor); Qamar, A. Shams (Inventor)

    2010-01-01

    A damage locating system also provides thermal protection. An array of sensors substantially tiles an area of interest. Each sensor is a reflective-surface conductor having operatively coupled inductance and capacitance. A magnetic field response recorder is provided to interrogate each sensor before and after a damage condition. Changes in response are indicative of damage and a corresponding location thereof.

  13. Dust/Regolith for Surface Exploration

    NASA Technical Reports Server (NTRS)

    Peters, Benjamin

    2017-01-01

    System-wide dust protection is a key design driver for xEMUsurface operations, and development of dust proof mechanisms, bearings, materials, and coatings coupled with specific operations and surface architecture development is critical for success.

  14. Transmission line relay mis-operation detection based on time-synchronized field data

    DOE PAGES

    Esmaeilian, Ahad; Popovic, Tomo; Kezunovic, Mladen

    2015-05-04

    In this paper, a real-time tool to detect transmission line relay mis-operation is implemented. The tool uses time-synchronized measurements obtained from both ends of the line during disturbances. The proposed fault analysis tool comes into the picture only after the protective device has operated and tripped the line. The proposed methodology is able not only to detect, classify, and locate transmission line faults, but also to accurately confirm whether the line was tripped due to a mis-operation of protective relays. The analysis report includes either detailed description of the fault type and location or detection of relay mis-operation. As such,more » it can be a source of very useful information to support the system restoration. The focus of the paper is on the implementation requirements that allow practical application of the methodology, which is illustrated using the field data obtained the real power system. Testing and validation is done using the field data recorded by digital fault recorders and protective relays. The test data included several hundreds of event records corresponding to both relay mis-operations and actual faults. The discussion of results addresses various challenges encountered during the implementation and validation of the presented methodology.« less

  15. Partially annotated bibliography for computer protection and related topics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huskamp, J.C.

    1976-07-20

    References for the commonly cited technical papers in the area of computer protection are given. Great care is taken to exclude papers with no technical content or merit. For the purposes of this bibliography, computer protection is broadly defined to encompass all facets of the protection problem. The papers cover, but are not limited to, the topics of protection features in operating systems (e.g., MULTICS and HYDRA), hardware implementations of protection facilities (e.g., Honeywell 6180, System 250, BCC 5000, B6500), data base protection controls, confinement and protection models. Since computer protection is related to many other areas in computer sciencemore » and electrical engineering, a bibliography of related areas is included after the protection bibliography. These sections also include articles of general interest in the named areas which are not necessarily related to protection.« less

  16. Protection of the CERN Large Hadron Collider

    NASA Astrophysics Data System (ADS)

    Schmidt, R.; Assmann, R.; Carlier, E.; Dehning, B.; Denz, R.; Goddard, B.; Holzer, E. B.; Kain, V.; Puccio, B.; Todd, B.; Uythoven, J.; Wenninger, J.; Zerlauth, M.

    2006-11-01

    The Large Hadron Collider (LHC) at CERN will collide two counter-rotating proton beams, each with an energy of 7 TeV. The energy stored in the superconducting magnet system will exceed 10 GJ, and each beam has a stored energy of 362 MJ which could cause major damage to accelerator equipment in the case of uncontrolled beam loss. Safe operation of the LHC will therefore rely on a complex system for equipment protection. The systems for protection of the superconducting magnets in case of quench must be fully operational before powering the magnets. For safe injection of the 450 GeV beam into the LHC, beam absorbers must be in their correct positions and specific procedures must be applied. Requirements for safe operation throughout the cycle necessitate early detection of failures within the equipment, and active monitoring of the beam with fast and reliable beam instrumentation, mainly beam loss monitors (BLM). When operating with circulating beams, the time constant for beam loss after a failure extends from apms to a few minutes—failures must be detected sufficiently early and transmitted to the beam interlock system that triggers a beam dump. It is essential that the beams are properly extracted on to the dump blocks at the end of a fill and in case of emergency, since the beam dump blocks are the only elements of the LHC that can withstand the impact of the full beam.

  17. 40 CFR 63.143 - Process wastewater provisions-inspections and monitoring of operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-inspections and monitoring of operations. 63.143 Section 63.143 Protection of Environment ENVIRONMENTAL..., and Wastewater § 63.143 Process wastewater provisions—inspections and monitoring of operations. (a) For each wastewater tank, surface impoundment, container, individual drain system, and oil-water...

  18. 40 CFR 63.143 - Process wastewater provisions-inspections and monitoring of operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-inspections and monitoring of operations. 63.143 Section 63.143 Protection of Environment ENVIRONMENTAL..., and Wastewater § 63.143 Process wastewater provisions—inspections and monitoring of operations. (a) For each wastewater tank, surface impoundment, container, individual drain system, and oil-water...

  19. 40 CFR 63.143 - Process wastewater provisions-inspections and monitoring of operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-inspections and monitoring of operations. 63.143 Section 63.143 Protection of Environment ENVIRONMENTAL..., and Wastewater § 63.143 Process wastewater provisions—inspections and monitoring of operations. (a) For each wastewater tank, surface impoundment, container, individual drain system, and oil-water...

  20. 40 CFR 63.143 - Process wastewater provisions-inspections and monitoring of operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-inspections and monitoring of operations. 63.143 Section 63.143 Protection of Environment ENVIRONMENTAL..., and Wastewater § 63.143 Process wastewater provisions—inspections and monitoring of operations. (a) For each wastewater tank, surface impoundment, container, individual drain system, and oil-water...

  1. Distributed photovoltaic systems - Addressing the utility interface issues

    NASA Astrophysics Data System (ADS)

    Firstman, S. I.; Vachtsevanos, G. J.

    This paper reviews work conducted in the United States on the impact of dispersed photovoltaic sources upon utility operations. The photovoltaic (PV) arrays are roof-mounted on residential houses and connected, via appropriate power conditioning equipment, to the utility grid. The presence of such small (4-6 Kw) dispersed generators on the distribution network raises questions of a technical, economic and institutional nature. After a brief identification of utility interface issues, the paper addresses such technical concerns as protection of equipment and personnel safety, power quality and utility operational stability. A combination of experimental and analytical approaches has been adopted to arrive at solutions to these problems. Problem areas, under various PV system penetration scenarios, are identified and conceptual designs of protection and control equipment and operating policies are developed so that system reliability is maintained while minimizing capital costs. It is hoped that the resolution of balance-of-system and grid interface questions will ascertain the economic viability of photovoltaic systems and assist in their widespread utilization in the future.

  2. A protection system for the JET ITER-like wall based on imaging diagnostics.

    PubMed

    Arnoux, G; Devaux, S; Alves, D; Balboa, I; Balorin, C; Balshaw, N; Beldishevski, M; Carvalho, P; Clever, M; Cramp, S; de Pablos, J-L; de la Cal, E; Falie, D; Garcia-Sanchez, P; Felton, R; Gervaise, V; Goodyear, A; Horton, A; Jachmich, S; Huber, A; Jouve, M; Kinna, D; Kruezi, U; Manzanares, A; Martin, V; McCullen, P; Moncada, V; Obrejan, K; Patel, K; Lomas, P J; Neto, A; Rimini, F; Ruset, C; Schweer, B; Sergienko, G; Sieglin, B; Soleto, A; Stamp, M; Stephen, A; Thomas, P D; Valcárcel, D F; Williams, J; Wilson, J; Zastrow, K-D

    2012-10-01

    The new JET ITER-like wall (made of beryllium and tungsten) is more fragile than the former carbon fiber composite wall and requires active protection to prevent excessive heat loads on the plasma facing components (PFC). Analog CCD cameras operating in the near infrared wavelength are used to measure surface temperature of the PFCs. Region of interest (ROI) analysis is performed in real time and the maximum temperature measured in each ROI is sent to the vessel thermal map. The protection of the ITER-like wall system started in October 2011 and has already successfully led to a safe landing of the plasma when hot spots were observed on the Be main chamber PFCs. Divertor protection is more of a challenge due to dust deposits that often generate false hot spots. In this contribution we describe the camera, data capture and real time processing systems. We discuss the calibration strategy for the temperature measurements with cross validation with thermal IR cameras and bi-color pyrometers. Most importantly, we demonstrate that a protection system based on CCD cameras can work and show examples of hot spot detections that stop the plasma pulse. The limits of such a design and the associated constraints on the operations are also presented.

  3. A protection system for the JET ITER-like wall based on imaging diagnosticsa)

    NASA Astrophysics Data System (ADS)

    Arnoux, G.; Devaux, S.; Alves, D.; Balboa, I.; Balorin, C.; Balshaw, N.; Beldishevski, M.; Carvalho, P.; Clever, M.; Cramp, S.; de Pablos, J.-L.; de la Cal, E.; Falie, D.; Garcia-Sanchez, P.; Felton, R.; Gervaise, V.; Goodyear, A.; Horton, A.; Jachmich, S.; Huber, A.; Jouve, M.; Kinna, D.; Kruezi, U.; Manzanares, A.; Martin, V.; McCullen, P.; Moncada, V.; Obrejan, K.; Patel, K.; Lomas, P. J.; Neto, A.; Rimini, F.; Ruset, C.; Schweer, B.; Sergienko, G.; Sieglin, B.; Soleto, A.; Stamp, M.; Stephen, A.; Thomas, P. D.; Valcárcel, D. F.; Williams, J.; Wilson, J.; Zastrow, K.-D.; JET-EFDA Contributors

    2012-10-01

    The new JET ITER-like wall (made of beryllium and tungsten) is more fragile than the former carbon fiber composite wall and requires active protection to prevent excessive heat loads on the plasma facing components (PFC). Analog CCD cameras operating in the near infrared wavelength are used to measure surface temperature of the PFCs. Region of interest (ROI) analysis is performed in real time and the maximum temperature measured in each ROI is sent to the vessel thermal map. The protection of the ITER-like wall system started in October 2011 and has already successfully led to a safe landing of the plasma when hot spots were observed on the Be main chamber PFCs. Divertor protection is more of a challenge due to dust deposits that often generate false hot spots. In this contribution we describe the camera, data capture and real time processing systems. We discuss the calibration strategy for the temperature measurements with cross validation with thermal IR cameras and bi-color pyrometers. Most importantly, we demonstrate that a protection system based on CCD cameras can work and show examples of hot spot detections that stop the plasma pulse. The limits of such a design and the associated constraints on the operations are also presented.

  4. Protective link for superconducting coil

    DOEpatents

    Umans, Stephen D [Belmont, MA

    2009-12-08

    A superconducting coil system includes a superconducting coil and a protective link of superconducting material coupled to the superconducting coil. A rotating machine includes first and second coils and a protective link of superconducting material. The second coil is operable to rotate with respect to the first coil. One of the first and second coils is a superconducting coil. The protective link is coupled to the superconducting coil.

  5. The Systems Engineering Design of a Smart Forward Operating Base Surveillance System for Forward Operating Base Protection

    DTIC Science & Technology

    2013-06-01

    fixed sensors located along the perimeter of the FOB. The video is analyzed for facial recognition to alert the Network Operations Center (NOC...the UAV is processed on board for facial recognition and video for behavior analysis is sent directly to the Network Operations Center (NOC). Video...captured by the fixed sensors are sent directly to the NOC for facial recognition and behavior analysis processing. The multi- directional signal

  6. SRB Processing Facilities Media Event

    NASA Image and Video Library

    2016-03-01

    Inside the Booster Fabrication Facility (BFF) at NASA’s Kennedy Space Center in Florida, Jeff Cook, a thermal protection system specialist with Orbital ATK, displays a sample of the painted thermal protection system that is being applied to booster segments. Members of the news media toured the BFF. Orbital ATK is a contractor for NASA’s Marshall Space Flight Center in Alabama, and operates the BFF to prepare aft booster segments and hardware for the SLS rocket boosters. The SLS rocket and Orion spacecraft will launch on Exploration Mission-1 in 2018. The Ground Systems Development and Operations Program is preparing the infrastructure to process and launch spacecraft for deep-space missions and the journey to Mars.

  7. Adaptive envelope protection methods for aircraft

    NASA Astrophysics Data System (ADS)

    Unnikrishnan, Suraj

    Carefree handling refers to the ability of a pilot to operate an aircraft without the need to continuously monitor aircraft operating limits. At the heart of all carefree handling or maneuvering systems, also referred to as envelope protection systems, are algorithms and methods for predicting future limit violations. Recently, envelope protection methods that have gained more acceptance, translate limit proximity information to its equivalent in the control channel. Envelope protection algorithms either use very small prediction horizon or are static methods with no capability to adapt to changes in system configurations. Adaptive approaches maximizing prediction horizon such as dynamic trim, are only applicable to steady-state-response critical limit parameters. In this thesis, a new adaptive envelope protection method is developed that is applicable to steady-state and transient response critical limit parameters. The approach is based upon devising the most aggressive optimal control profile to the limit boundary and using it to compute control limits. Pilot-in-the-loop evaluations of the proposed approach are conducted at the Georgia Tech Carefree Maneuver lab for transient longitudinal hub moment limit protection. Carefree maneuvering is the dual of carefree handling in the realm of autonomous Uninhabited Aerial Vehicles (UAVs). Designing a flight control system to fully and effectively utilize the operational flight envelope is very difficult. With the increasing role and demands for extreme maneuverability there is a need for developing envelope protection methods for autonomous UAVs. In this thesis, a full-authority automatic envelope protection method is proposed for limit protection in UAVs. The approach uses adaptive estimate of limit parameter dynamics and finite-time horizon predictions to detect impending limit boundary violations. Limit violations are prevented by treating the limit boundary as an obstacle and by correcting nominal control/command inputs to track a limit parameter safe-response profile near the limit boundary. The method is evaluated using software-in-the-loop and flight evaluations on the Georgia Tech unmanned rotorcraft platform---GTMax. The thesis also develops and evaluates an extension for calculating control margins based on restricting limit parameter response aggressiveness near the limit boundary.

  8. Passively operated spool valve for drain-down freeze protection of thermosyphon water heaters. Final technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1982-04-30

    The work done to extend the existing drain-down valve technology to provide passive drain-down freeze protection for thermosyphon-based solar water heaters is described. The basic design of the existing valve model is that of a spool valve, employing a cylindrical spool which moves axially in a mating cartridge to open and close o-rings at the two operating extremes (drain and operate) to perform the valving function. Three passive actuators to drive the basic valving mechanism were designed, fabricated, and tested. Two piping configurations used to integrate the spool valve with the thermosyphon system are described, as are the passive actuators.more » The three actuator designs are: photovoltaic driven, refrigerant-based bellows, and heat motor cable-drive designs. Costs are compared for the alternative actuator designs, and operating characteristics were examined for the thermosyphon system, including field tests. The market for the valve for thermosyphon systems is then assessed. (LEW)« less

  9. An arc control and protection system for the JET lower hybrid antenna based on an imaging system.

    PubMed

    Figueiredo, J; Mailloux, J; Kirov, K; Kinna, D; Stamp, M; Devaux, S; Arnoux, G; Edwards, J S; Stephen, A V; McCullen, P; Hogben, C

    2014-11-01

    Arcs are the potentially most dangerous events related to Lower Hybrid (LH) antenna operation. If left uncontrolled they can produce damage and cause plasma disruption by impurity influx. To address this issue an arc real time control and protection imaging system for the Joint European Torus (JET) LH antenna has been implemented. The LH system is one of the additional heating systems at JET. It comprises 24 microwave generators (klystrons, operating at 3.7 GHz) providing up to 5 MW of heating and current drive to the JET plasma. This is done through an antenna composed of an array of waveguides facing the plasma. The protection system presented here is based primarily on an imaging arc detection and real time control system. It has adapted the ITER like wall hotspot protection system using an identical CCD camera and real time image processing unit. A filter has been installed to avoid saturation and spurious system triggers caused by ionization light. The antenna is divided in 24 Regions Of Interest (ROIs) each one corresponding to one klystron. If an arc precursor is detected in a ROI, power is reduced locally with subsequent potential damage and plasma disruption avoided. The power is subsequently reinstated if, during a defined interval of time, arcing is confirmed not to be present by image analysis. This system was successfully commissioned during the restart phase and beginning of the 2013 scientific campaign. Since its installation and commissioning, arcs and related phenomena have been prevented. In this contribution we briefly describe the camera, image processing, and real time control systems. Most importantly, we demonstrate that an LH antenna arc protection system based on CCD camera imaging systems works. Examples of both controlled and uncontrolled LH arc events and their consequences are shown.

  10. Optimal and centralized reservoir management for drought and flood protection via Stochastic Dual Dynamic Programming on the Upper Seine-Aube River system

    NASA Astrophysics Data System (ADS)

    Chiavico, Mattia; Raso, Luciano; Dorchies, David; Malaterre, Pierre-Olivier

    2015-04-01

    Seine river region is an extremely important logistic and economic junction for France and Europe. The hydraulic protection of most part of the region relies on four controlled reservoirs, managed by EPTB Seine-Grands Lacs. Presently, reservoirs operation is not centrally coordinated, and release rules are based on empirical filling curves. In this study, we analyze how a centralized release policy can face flood and drought risks, optimizing water system efficiency. The optimal and centralized decisional problem is solved by Stochastic Dual Dynamic Programming (SDDP) method, minimizing an operational indicator for each planning objective. SDDP allows us to include into the system: 1) the hydrological discharge, specifically a stochastic semi-distributed auto-regressive model, 2) the hydraulic transfer model, represented by a linear lag and route model, and 3) reservoirs and diversions. The novelty of this study lies on the combination of reservoir and hydraulic models in SDDP for flood and drought protection problems. The study case covers the Seine basin until the confluence with Aube River: this system includes two reservoirs, the city of Troyes, and the Nuclear power plant of Nogent-Sur-Seine. The conflict between the interests of flood protection, drought protection, water use and ecology leads to analyze the environmental system in a Multi-Objective perspective.

  11. Design of Remote Heat-Meter System Based on Trusted Technology

    NASA Astrophysics Data System (ADS)

    Yu, Changgeng; Lai, Liping

    2018-03-01

    This article presents a proposal of a heat meter and remote meter reading system for the disadvantages of the hackers very easily using eavesdropping, tampering, replay attack of traditional remote meter reading system. The system selects trusted technology such as, the identity authentication, integrity verifying, and data protection. By the experiments, it is proved that the remote meter reading system of the heat meter can be used to verify the feasibility of the technology, and verify the practicability and operability of data protection technology.

  12. 77 FR 30274 - The Commission's Role Regarding the Environmental Protection Agency's Mercury and Air Toxics...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... (`FERC'), Regional Transmission Operators (`RTOs'), Independent System Operators (`ISOs') and other..., RTOs and ISOs, Planning Authorities, NERC and affiliated regional entities--and we encourage them to do...

  13. Orion Space Hardware In-Production inside the Operations and Che

    NASA Image and Video Library

    2017-10-03

    Thermal protection system panels are in view in the high bay of the Neil Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida. The Orion crew module for NASA’s Exploration Mission 1 (EM-1) is being prepared for its first integrated flight atop the Space Launch System rocket.

  14. 14 CFR 29.1093 - Induction system icing protection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... prevent icing has a preheater that can provide a heat rise of 100 °F. (b) Turbine engines. (1) It must be shown that each turbine engine and its air inlet system can operate throughout the flight power range of... engine operation, within the limitations established for the rotorcraft. (2) Each turbine engine must...

  15. 14 CFR 29.1093 - Induction system icing protection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... prevent icing has a preheater that can provide a heat rise of 100 °F. (b) Turbine engines. (1) It must be shown that each turbine engine and its air inlet system can operate throughout the flight power range of... engine operation, within the limitations established for the rotorcraft. (2) Each turbine engine must...

  16. 14 CFR 29.1093 - Induction system icing protection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... prevent icing has a preheater that can provide a heat rise of 100 °F. (b) Turbine engines. (1) It must be shown that each turbine engine and its air inlet system can operate throughout the flight power range of... engine operation, within the limitations established for the rotorcraft. (2) Each turbine engine must...

  17. 14 CFR 29.1093 - Induction system icing protection.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... prevent icing has a preheater that can provide a heat rise of 100 °F. (b) Turbine engines. (1) It must be shown that each turbine engine and its air inlet system can operate throughout the flight power range of... engine operation, within the limitations established for the rotorcraft. (2) Each turbine engine must...

  18. 78 FR 77726 - Exelon Generation Company, LLC Three Mile Island Nuclear Station, Unit 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-24

    [email protected] . NRC's Agencywide Documents Access and Management System (ADAMS): You may access publicly... safety during any condition of normal operation, including anticipated operational occurrences and system... for exemption is based on the use of the 1997 and 2002, editions of American Society for Testing and...

  19. 14 CFR 27.1316 - Electrical and electronic system lightning protection.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... after the time the rotorcraft is exposed to lightning; and (2) The system automatically recovers normal operation of that function in a timely manner after the rotorcraft is exposed to lightning. (b) For... recovers normal operation in a timely manner after the rotorcraft is exposed to lightning. [Doc. No. FAA...

  20. 14 CFR 27.1316 - Electrical and electronic system lightning protection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... after the time the rotorcraft is exposed to lightning; and (2) The system automatically recovers normal operation of that function in a timely manner after the rotorcraft is exposed to lightning. (b) For... recovers normal operation in a timely manner after the rotorcraft is exposed to lightning. [Doc. No. FAA...

  1. 14 CFR 27.1316 - Electrical and electronic system lightning protection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... after the time the rotorcraft is exposed to lightning; and (2) The system automatically recovers normal operation of that function in a timely manner after the rotorcraft is exposed to lightning. (b) For... recovers normal operation in a timely manner after the rotorcraft is exposed to lightning. [Doc. No. FAA...

  2. Cyberspace as a Complex Adaptive System and the Policy and Operational Implications for Cyber Warfare

    DTIC Science & Technology

    2014-05-22

    CYBERSPACE AS A COMPLEX ADAPTIVE SYSTEM AND THE POLICY AND OPERTIONAL IMPLICATIONS FOR CYBER WARFARE A Monograph by Major Albert O. Olagbemiro...serves the US, especially in regards to the protect ion o f the 1S. SUBJECT TERMS omplex Adaptive System, Cyberspace, lnfosphere, Cyber Warfare ber...System and the Policy and Operational Implications for Cyber Warfare Approved by: __________________________________, Monograph Director Jeffrey

  3. Model Predictive Control application for real time operation of controlled structures for the Water Authority Noorderzijlvest, The Netherlands

    NASA Astrophysics Data System (ADS)

    van Heeringen, Klaas-Jan; Gooijer, Jan; Knot, Floris; Talsma, Jan

    2015-04-01

    In the Netherlands, flood protection has always been a key issue to protect settlements against storm surges and riverine floods. Whereas flood protection traditionally focused on structural measures, nowadays the availability of meteorological and hydrological forecasts enable the application of more advanced real-time control techniques for operating the existing hydraulic infrastructure in an anticipatory and more efficient way. Model Predictive Control (MPC) is a powerful technique to derive optimal control variables with the help of model based predictions evaluated against a control objective. In a project for the regional water authority Noorderzijlvest in the north of the Netherlands, it has been shown that MPC can increase the safety level of the system during flood events by an anticipatory pre-release of water. Furthermore, energy costs of pumps can be reduced by making tactical use of the water storage and shifting pump activities during normal operating conditions to off-peak hours. In this way cheap energy is used in combination of gravity flow through gates during low tide periods. MPC has now been implemented for daily operational use of the whole water system of the water authority Noorderzijlvest. The system developed to a real time decision support system which not only supports the daily operation but is able to directly implement the optimal control settings at the structures. We explain how we set-up and calibrated a prediction model (RTC-Tools) that is accurate and fast enough for optimization purposes, and how we integrated it in the operational flood early warning system (Delft-FEWS). Beside the prediction model, the weights and the factors of the objective function are an important element of MPC, since they shape the control objective. We developed special features in Delft-FEWS to allow the operators to adjust the objective function in order to meet changing requirements and to evaluate different control strategies.

  4. 40 CFR 1036.801 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF... the environment. Exhaust-gas recirculation (EGR) and turbochargers are not aftertreatment. Aircraft... operation of any part of the emission control system. Averaging set has the meaning given in § 1036.740...

  5. 40 CFR 141.802 - Coliform sampling plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Section 141.802 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Aircraft Drinking Water Rule § 141.802 Coliform... aircraft water system owned or operated by the air carrier that identifies the following: (1) Coliform...

  6. 40 CFR 141.802 - Coliform sampling plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Section 141.802 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Aircraft Drinking Water Rule § 141.802 Coliform... aircraft water system owned or operated by the air carrier that identifies the following: (1) Coliform...

  7. 40 CFR 141.802 - Coliform sampling plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Section 141.802 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Aircraft Drinking Water Rule § 141.802 Coliform... aircraft water system owned or operated by the air carrier that identifies the following: (1) Coliform...

  8. 40 CFR 265.223 - Containment system.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 265.223 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL..., such as grass, shale, or rock, to minimize wind and water erosion and to preserve their structural...

  9. The Curiosity Mars Rover's Fault Protection Engine

    NASA Technical Reports Server (NTRS)

    Benowitz, Ed

    2014-01-01

    The Curiosity Rover, currently operating on Mars, contains flight software onboard to autonomously handle aspects of system fault protection. Over 1000 monitors and 39 responses are present in the flight software. Orchestrating these behaviors is the flight software's fault protection engine. In this paper, we discuss the engine's design, responsibilities, and present some lessons learned for future missions.

  10. Enviromnental Control and Life Support Systems for Mars Missions - Issues and Concerns for Planetary Protection

    NASA Technical Reports Server (NTRS)

    Barta, Daniel J.; Anderson, Molly S.; Lange, Kevin

    2015-01-01

    Planetary protection represents an additional set of requirements that generally have not been considered by developers of technologies for Environmental Control and Life Support Systems (ECLSS). Planetary protection guidelines will affect the kind of operations, processes, and functions that can take place during future human planetary exploration missions. Ultimately, there will be an effect on mission costs, including the mission trade space when planetary protection requirements begin to drive vehicle deisgn in a concrete way. Planetary protection requirements need to be considered early in technology development and mission programs in order to estimate these impacts and push back on requirements or find efficient ways to perform necessary functions. It is expected that planetary protection will be a significant factor during technology selection and system architecture design for future missions.

  11. Protection relay of phase-shifting device with thyristor switch for high voltage power transmission lines

    NASA Astrophysics Data System (ADS)

    Lachugin, V. F.; Panfilov, D. I.; Akhmetov, I. M.; Astashev, M. G.; Shevelev, A. V.

    2014-12-01

    Problems of functioning of differential current protection systems of phase shifting devices (PSD) with mechanically changed coefficient of transformation of shunt transformer are analyzed. Requirements for devices of protection of PSD with thyristor switch are formulated. Based on use of nonlinear models of series-wound and shunt transformers of PSD modes of operation of major protection during PSD, switching to zero load operation and to operation under load and during short circuit operation were studied for testing PSD with failures. Use of the principle of duplicating by devices of differential current protection (with realization of functions of breaking) of failures of separate pares of PSD with thyristor switch was substantiated. To ensure protection sensitivity to the shunt transformer winding short circuit, in particular, to a short circuit that is not implemented in the current differential protection for PSD with mechanical switch, the differential current protection reacting to the amount of primary ampere-turns of high-voltage and low-voltage winding of this transformer was designed. Studies have shown that the use of differential current cutoff instead of overcurrent protection for the shunt transformer wndings allows one to provide the sensitivity during thyristor failure with the formation of a short circuit. The results of simulation mode for the PSD with switch thyristor designed to be installed as switching point of Voskhod-Tatarskaya-Barabinsk 220 kV transmission line point out the efficiency of the developed solutions that ensure reliable functioning of the PSD.

  12. The Double-System Architecture for Trusted OS

    NASA Astrophysics Data System (ADS)

    Zhao, Yong; Li, Yu; Zhan, Jing

    With the development of computer science and technology, current secure operating systems failed to respond to many new security challenges. Trusted operating system (TOS) is proposed to try to solve these problems. However, there are no mature, unified architectures for the TOS yet, since most of them cannot make clear of the relationship between security mechanism and the trusted mechanism. Therefore, this paper proposes a double-system architecture (DSA) for the TOS to solve the problem. The DSA is composed of the Trusted System (TS) and the Security System (SS). We constructed the TS by establishing a trusted environment and realized related SS. Furthermore, we proposed the Trusted Information Channel (TIC) to protect the information flow between TS and SS. In a word, the double system architecture we proposed can provide reliable protection for the OS through the SS with the supports provided by the TS.

  13. RHIC BEAM ABORT KICKER POWER SUPPLY SYSTEM COMMISSIONING EXPERIENCE AND REMAINING ISSUES.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ZHANG,W.; AHRENS,L.A.; MI,J.

    2001-06-18

    The RHIC Beam Abort Kicker Power Supply Systems commissioning experience and the remaining issues will be reported in this paper. The RHIC Blue Ring Beam Abort Kicker Power Supply System initial commissioning took place in June 1999. Its identical system in Yellow Ring was brought on line during Spring 2000. Each of the RHIC Beam Abort Kicker Power Supply Systems consists of five high voltage modulators and subsystems. These systems are critical devices for RHIC machine protection and environmental protection. They are required to be effective, reliable and operating with sufficient redundancy to safely abort the beam to its beammore » dump at the end of accumulation or at any time when they are commanded. To deflect 66 GeV ion beam to the beam absorbers, the RHIC Beam Abort Kicker Power Supply Systems were operated at 22 kV level. The RHIC 2000 commissioning run was very successful.« less

  14. Army gas-cooled reactor systems program. Preliminary design report off-normal scram system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bushnell, W.H.; Malmstrom, S.A.

    1965-06-01

    The maximum allowable ML-1 fuel element cladding (hot spot) temperature is established by ANTS 201 at 1750/sup 0/F. The existing ML-1 design makes no provision for automatic scram when this limit is reached. Operating experience has indicated a requirement for such an automatic system during plant startup and a revised hot spot envelope (generated during conceptual design of the scram system) established the desirability of extending this protection to operation at full power conditions. It was also determined that the scram system should include circuitry to initiate an automatic scram if reactor ..delta..T exceeded 450/sup 0/F (the limit established inmore » ANTS 201) and if reactor power exceeded 6 kw(t) without coolant flow in the main loop. The preliminary design of the scram system (designated off-normal scram system) which will provide the required protection is described.« less

  15. Training and Technical Assistance for Small Systems Funding

    EPA Pesticide Factsheets

    Provides water and wastewater system staff and private well owners with training and tools to enhance system operations and management practices, and support EPA’s continuing efforts to protect public health and promote sustainability.

  16. Advanced Protection & Service Restoration for FREEDM Systems

    NASA Astrophysics Data System (ADS)

    Singh, Urvir

    A smart electric power distribution system (FREEDM system) that incorporates DERs (Distributed Energy Resources), SSTs (Solid State Transformers - that can limit the fault current to two times of the rated current) & RSC (Reliable & Secure Communication) capabilities has been studied in this work in order to develop its appropriate protection & service restoration techniques. First, a solution is proposed that can make conventional protective devices be able to provide effective protection for FREEDM systems. Results show that although this scheme can provide required protection but it can be quite slow. Using the FREEDM system's communication capabilities, a communication assisted Overcurrent (O/C) protection scheme is proposed & results show that by using communication (blocking signals) very fast operating times are achieved thereby, mitigating the problem of conventional O/C scheme. Using the FREEDM System's DGI (Distributed Grid Intelligence) capability, an automated FLISR (Fault Location, Isolation & Service Restoration) scheme is proposed that is based on the concept of 'software agents' & uses lesser data (than conventional centralized approaches). Test results illustrated that this scheme is able to provide a global optimal system reconfiguration for service restoration.

  17. Political and legal implications of developing and operating a satellite power system

    NASA Technical Reports Server (NTRS)

    Hazelrigg, G. A., Jr.

    1977-01-01

    A number of political and legal implications of developing and operating a satellite power system (SPS) are identified and studied in this report. These include the vulnerability of SPS to actions of adversaries, communications impacts, the legality of an SPS in orbit including on-orbit military protection, alleviation of political concerns about deployment and operation of SPS, programmatic planning for SPS and the interaction of SPS with federal regulatory agencies and major departments. In comparing SPS to terrestrial power stations, it is seen that the political problems are neither clearly larger nor clearly smaller--they are clearly different and they are international in nature. If SPS is to become a reality these problems must be dealt with. Five major issues are identified. These must be resolved in order to obtain international acceptance of SPS. However, this study has found no insurmountable obstacles that would clearly prohibit the deployment, operation and protection of an SPS fleet.

  18. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...

  19. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true What are my monitoring installation... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according to the...

  20. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 13 2014-07-01 2014-07-01 false What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...

  1. 47 CFR 15.209 - Radiated emission limits; general requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...), fundamental emissions from intentional radiators operating under this section shall not be located in the... fundamental emission. For intentional radiators which operate under the provisions of other sections within... incorporated digital device. (g) Perimeter protection systems may operate in the 54-72 MHz and 76-88 MHz bands...

  2. Advanced power system protection and incipient fault detection and protection of spaceborne power systems

    NASA Technical Reports Server (NTRS)

    Russell, B. Don

    1989-01-01

    This research concentrated on the application of advanced signal processing, expert system, and digital technologies for the detection and control of low grade, incipient faults on spaceborne power systems. The researchers have considerable experience in the application of advanced digital technologies and the protection of terrestrial power systems. This experience was used in the current contracts to develop new approaches for protecting the electrical distribution system in spaceborne applications. The project was divided into three distinct areas: (1) investigate the applicability of fault detection algorithms developed for terrestrial power systems to the detection of faults in spaceborne systems; (2) investigate the digital hardware and architectures required to monitor and control spaceborne power systems with full capability to implement new detection and diagnostic algorithms; and (3) develop a real-time expert operating system for implementing diagnostic and protection algorithms. Significant progress has been made in each of the above areas. Several terrestrial fault detection algorithms were modified to better adapt to spaceborne power system environments. Several digital architectures were developed and evaluated in light of the fault detection algorithms.

  3. SAMPLING SYSTEM

    DOEpatents

    Hannaford, B.A.; Rosenberg, R.; Segaser, C.L.; Terry, C.L.

    1961-01-17

    An apparatus is given for the batch sampling of radioactive liquids such as slurries from a system by remote control, while providing shielding for protection of operating personnel from the harmful effects of radiation.

  4. Machine Protection System for the Stepper Motor Actuated SyLMAND Mirrors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Subramanian, V. R.; Dolton, W.; Wells, G.

    2010-06-23

    SyLMAND, the Synchrotron Laboratory for Micro and Nano Devices at the Canadian Light Source, consists of a dedicated X-ray lithography beamline on a bend magnet port, and process support laboratories in a clean room environment. The beamline includes a double mirror system with flat, chromium-coated silicon mirrors operated at varying grazing angles of incidence (4 mrad to 45 mrad) for spectral adjustment by high energy cut-off. Each mirror can be independently moved by two stepper motors to precisely control the pitch and vertical position. We present in this paper the machine protection system implemented in the double mirror system tomore » allow for safe operation of the two mirrors and to avoid consequences of potential stepper motor malfunction.« less

  5. An Engineering Look at Space Shuttle and ISS Operations

    NASA Technical Reports Server (NTRS)

    Hernandez, Jose M.

    2004-01-01

    This slide presentation, in Spanish, is an overview of NASA's Space Shuttle operations and preparations for serving the International Space Station. There is information and or views of the shuttle's design, the propulsion system, the external tanks, the foam insulation, the reusable solid rocket motors, the vehicle assembly building (VAB), the mobile launcher platform being moved from the VAB to the launch pad. There is a presentation of some of the current issues with the space shuttle: cracks in the LH2 flow lines, corrosion and pitting, the thermal protection system, and inspection of the thermal protection system while in orbit. The shuttle system has served for more than 20 years, it is still a challenge to re-certify the vehicles for flight. Materials and material science remain as chief concerns for the shuttle,

  6. Grade Crossing Protection in High-Speed, High-Density, Passenger-Service Rail Corridors

    DOT National Transportation Integrated Search

    1973-01-01

    The report is a preliminary examination of special aspects of grade crossing protection for operation of high-speed passenger trains in rail corridors for which complete grade separation is not possible. Overall system needs and constraints are indic...

  7. 40 CFR 1065.925 - PEMS preparation for field testing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... 1065.925 Section 1065.925 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... purge any gaseous sampling PEMS instruments with ambient air until sampling begins to prevent system contamination from excessive cold-start emissions. (e) Conduct calibrations and verifications. (f) Operate any...

  8. The Coast Guard Proceedings of the Marine Safety and Security Council: Spring 2016

    DTIC Science & Technology

    2016-04-01

    PROCEEDINGS Spring 2016 Vol. 73, Number 1 Safety Management System Objectives 6 Safety Management Facilitates Safe Vessel Operation Vessel systems...crew, and operations. by LCDR Aaron W. Demo 9 Safety Management Systems to Prevent Pollution from Ships Standard procedures protect the environment...by LCDR Michael Lendvay 11 Dead Reckoning by Safety Management ? Check your course. by LCDR Corydon F. Heard IV Safety Management Systems and the Outer

  9. Control System Applicable Use Assessment of the Secure Computing Corporation - Secure Firewall (Sidewinder)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hadley, Mark D.; Clements, Samuel L.

    2009-01-01

    Battelle’s National Security & Defense objective is, “applying unmatched expertise and unique facilities to deliver homeland security solutions. From detection and protection against weapons of mass destruction to emergency preparedness/response and protection of critical infrastructure, we are working with industry and government to integrate policy, operational, technological, and logistical parameters that will secure a safe future”. In an ongoing effort to meet this mission, engagements with industry that are intended to improve operational and technical attributes of commercial solutions that are related to national security initiatives are necessary. This necessity will ensure that capabilities for protecting critical infrastructure assets aremore » considered by commercial entities in their development, design, and deployment lifecycles thus addressing the alignment of identified deficiencies and improvements needed to support national cyber security initiatives. The Secure Firewall (Sidewinder) appliance by Secure Computing was assessed for applicable use in critical infrastructure control system environments, such as electric power, nuclear and other facilities containing critical systems that require augmented protection from cyber threat. The testing was performed in the Pacific Northwest National Laboratory’s (PNNL) Electric Infrastructure Operations Center (EIOC). The Secure Firewall was tested in a network configuration that emulates a typical control center network and then evaluated. A number of observations and recommendations are included in this report relating to features currently included in the Secure Firewall that support critical infrastructure security needs.« less

  10. A Field Study Training Program on Wastewater Lagoon Systems.

    ERIC Educational Resources Information Center

    Water and Wastewater Technical School, Neosho, MO.

    This publication is a text and reference manual for operating personnel of both large and small wastewater lagoon systems with support from the Environmental Protection Agency (EPA). As a text, this inservice training manual is intended to be used in a correspondence course wherein the trainee or operator would read and study each chapter before…

  11. Point-and-stare operation and high-speed image acquisition in real-time hyperspectral imaging

    NASA Astrophysics Data System (ADS)

    Driver, Richard D.; Bannon, David P.; Ciccone, Domenic; Hill, Sam L.

    2010-04-01

    The design and optical performance of a small-footprint, low-power, turnkey, Point-And-Stare hyperspectral analyzer, capable of fully automated field deployment in remote and harsh environments, is described. The unit is packaged for outdoor operation in an IP56 protected air-conditioned enclosure and includes a mechanically ruggedized fully reflective, aberration-corrected hyperspectral VNIR (400-1000 nm) spectrometer with a board-level detector optimized for point and stare operation, an on-board computer capable of full system data-acquisition and control, and a fully functioning internal hyperspectral calibration system for in-situ system spectral calibration and verification. Performance data on the unit under extremes of real-time survey operation and high spatial and high spectral resolution will be discussed. Hyperspectral acquisition including full parameter tracking is achieved by the addition of a fiber-optic based downwelling spectral channel for solar illumination tracking during hyperspectral acquisition and the use of other sensors for spatial and directional tracking to pinpoint view location. The system is mounted on a Pan-And-Tilt device, automatically controlled from the analyzer's on-board computer, making the HyperspecTM particularly adaptable for base security, border protection and remote deployments. A hyperspectral macro library has been developed to control hyperspectral image acquisition, system calibration and scene location control. The software allows the system to be operated in a fully automatic mode or under direct operator control through a GigE interface.

  12. Machine protection system for rotating equipment and method

    DOEpatents

    Lakshminarasimha, Arkalgud N.; Rucigay, Richard J.; Ozgur, Dincer

    2003-01-01

    A machine protection system and method for rotating equipment introduces new alarming features and makes use of full proximity probe sensor information, including amplitude and phase. Baseline vibration amplitude and phase data is estimated and tracked according to operating modes of the rotating equipment. Baseline vibration and phase data can be determined using a rolling average and variance and stored in a unit circle or tracked using short term average and long term average baselines. The sensed vibration amplitude and phase is compared with the baseline vibration amplitude and phase data. Operation of the rotating equipment can be controlled based on the vibration amplitude and phase.

  13. Architecture of security management unit for safe hosting of multiple agents

    NASA Astrophysics Data System (ADS)

    Gilmont, Tanguy; Legat, Jean-Didier; Quisquater, Jean-Jacques

    1999-04-01

    In such growing areas as remote applications in large public networks, electronic commerce, digital signature, intellectual property and copyright protection, and even operating system extensibility, the hardware security level offered by existing processors is insufficient. They lack protection mechanisms that prevent the user from tampering critical data owned by those applications. Some devices make exception, but have not enough processing power nor enough memory to stand up to such applications (e.g. smart cards). This paper proposes an architecture of secure processor, in which the classical memory management unit is extended into a new security management unit. It allows ciphered code execution and ciphered data processing. An internal permanent memory can store cipher keys and critical data for several client agents simultaneously. The ordinary supervisor privilege scheme is replaced by a privilege inheritance mechanism that is more suited to operating system extensibility. The result is a secure processor that has hardware support for extensible multitask operating systems, and can be used for both general applications and critical applications needing strong protection. The security management unit and the internal permanent memory can be added to an existing CPU core without loss of performance, and do not require it to be modified.

  14. KSC-04pd1842

    NASA Image and Video Library

    2004-09-18

    KENNEDY SPACE CENTER, FLA. - NASA Administrator Sean O’Keefe looks at equipment moved from the Thermal Protection System Facility to the RLV Hangar. AT right is Martin Wilson, manager of TPS operations for United Space Alliance. O’Keefe and NASA Associate Administrator of Space Operations Mission Directorate William Readdy are visiting KSC to survey the damage sustained by KSC facilities from Hurricane Frances. The Thermal Protection System Facility (TPSF), which creates the TPS tiles, blankets and all the internal thermal control systems for the Space Shuttles, is almost totally unserviceable at this time after losing approximately 35 percent of its roof in the storm, which blew across Central Florida Sept. 4-5. Undamaged equipment was removed from the TPSF and stored in the hangar. The Labor Day storm also caused significant damage to the Vehicle Assembly Building and Processing Control Center. Additionally, the Operations and Checkout Building, Vertical Processing Facility, Hangar AE, Hangar S and Hangar AF Small Parts Facility each received substantial damage. However, well-protected and unharmed were NASA’s three Space Shuttle orbiters -- Discovery, Atlantis and Endeavour - along with the Shuttle launch pads, all of the critical flight hardware for the orbiters and the International Space Station, and NASA’s Swift spacecraft that is awaiting launch in October.

  15. Reliability of the quench protection system for the LHC superconducting elements

    NASA Astrophysics Data System (ADS)

    Vergara Fernández, A.; Rodríguez-Mateos, F.

    2004-06-01

    The Quench Protection System (QPS) is the sole system in the Large Hadron Collider machine monitoring the signals from the superconducting elements (bus bars, current leads, magnets) which form the cold part of the electrical circuits. The basic functions to be accomplished by the QPS during the machine operation will be briefly presented. With more than 4000 internal trigger channels (quench detectors and others), the final QPS design is the result of an optimised balance between on-demand availability and false quench reliability. The built-in redundancy for the different equipment will be presented, focusing on the calculated, expected number of missed quenches and false quenches. Maintenance strategies in order to improve the performance over the years of operation will be addressed.

  16. Pervious pavements - installation, operations and strength part 4 : Flexipave(R) (recycled rubber tires) systems.

    DOT National Transportation Integrated Search

    2011-08-01

    Pervious : pavement : systems : are : now : being : recognized : as : a : best : management : practice : by : the : Environmental : Protection : Agency : and : the : state : of : Florida. : The : pervious : concrete : system : is : designed : to : ha...

  17. 40 CFR 22.42 - Supplemental rules governing the administrative assessment of civil penalties for violations of...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Supplemental rules governing the administrative assessment of civil penalties for violations of compliance orders issued to owners or operators of public water systems under part B of the Safe Drinking Water Act. 22.42 Section 22.42 Protection of Environment ENVIRONMENTAL PROTECTION...

  18. 40 CFR 22.42 - Supplemental rules governing the administrative assessment of civil penalties for violations of...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Supplemental rules governing the administrative assessment of civil penalties for violations of compliance orders issued to owners or operators of public water systems under part B of the Safe Drinking Water Act. 22.42 Section 22.42 Protection of Environment ENVIRONMENTAL PROTECTION...

  19. 40 CFR 22.42 - Supplemental rules governing the administrative assessment of civil penalties for violations of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Supplemental rules governing the administrative assessment of civil penalties for violations of compliance orders issued to owners or operators of public water systems under part B of the Safe Drinking Water Act. 22.42 Section 22.42 Protection of Environment ENVIRONMENTAL PROTECTION...

  20. 40 CFR 22.42 - Supplemental rules governing the administrative assessment of civil penalties for violations of...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Supplemental rules governing the administrative assessment of civil penalties for violations of compliance orders issued to owners or operators of public water systems under part B of the Safe Drinking Water Act. 22.42 Section 22.42 Protection of Environment ENVIRONMENTAL PROTECTION...

  1. 40 CFR 22.42 - Supplemental rules governing the administrative assessment of civil penalties for violations of...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Supplemental rules governing the administrative assessment of civil penalties for violations of compliance orders issued to owners or operators of public water systems under part B of the Safe Drinking Water Act. 22.42 Section 22.42 Protection of Environment ENVIRONMENTAL PROTECTION...

  2. Low-temperature overpressurization protection system setpoint analysis using RETRAN-02/MOD5 for Salem

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dodson, R.J.; Feltus, M.A.

    The low-temperature overpressurization protection system (LTOPS) is designed to protect the reactor pressure vessel (RPV) from brittle failure during startup and cooldown maneuvers in Westinghouse pressurized water reactors. For the Salem power plants, the power-operated relief valves (PORVs) mitigate pressure increases above a setpoint where an operational startup transient may put the RPV in the embrittlement fracture zone. The Title 10, Part 50, Code of Federal Regulations Appendix G limit, given by plant technical specifications, conservatively bounds the maximum pressure allowed during those transients where the RPV can suffer brittle fracture (usually below 350{degrees}F). The Appendix G limit is amore » pressure versus temperature curve that is more restrictive at lower RPV temperatures and allows for higher pressures as the temperature approaches the upper bounding fracture temperature.« less

  3. Altitude Scaling of Thermal Ice Protection Systems in Running Wet Operation

    NASA Technical Reports Server (NTRS)

    Orchard, D. M.; Addy, H. E.; Wright, W. B.; Tsao, J.

    2017-01-01

    A study into the effects of altitude on an aircraft thermal Ice Protection System (IPS) performance has been conducted by the National Research Council Canada (NRC) in collaboration with the NASA Glenn Icing Branch. The study included tests of an airfoil model, with a heated-air IPS, installed in the NRCs Altitude Icing Wind Tunnel (AIWT) at altitude and ground level conditions.

  4. Application of ERTS-1 data to the protection and management of New Jersey's coastal environment

    NASA Technical Reports Server (NTRS)

    Yunghans, R. S. (Principal Investigator); Feinberg, E. B.; Stitt, J. A.; Mairs, R. L.; Wobber, F. J.; Macomber, R. T.; Stanczuk, D. T.; Thibult, D.

    1974-01-01

    The author has identified the following significant results. Quasi-operational information products for coastal zone management have been prepared using ERTS-1 imagery and collateral aerial photography. These products were applied to the practical regulation, protection, and management of New Jersey's coastal environment. Procedures were developed for the operational use of ERTS-1 data products within New Jersey's Department of Environmental Protection. Successful analysis and product preparation for operational needs centered on four major coastal resource problem areas: (1) detection of environmental changes in coastal areas, (2) siting of ocean outfalls, (3) monitoring of offshore waste disposal, and (4) calculation of recession rates along the Atlantic Shore. The utility and monetary benefits derived from ERTS and aircraft imagery for each problem area have been determined. The NJDEP estimates the possibility of $620,000 yearly savings through the use of an operational ERTS system and a one-time savings of $2.8 million on current or planned projects if a truly operational ERTS type satellite were available.

  5. Implementation of Pilot Protection System for Large Scale Distribution System like The Future Renewable Electric Energy Distribution Management Project

    NASA Astrophysics Data System (ADS)

    Iigaya, Kiyohito

    A robust, fast and accurate protection system based on pilot protection concept was developed previously and a few alterations in that algorithm were made to make it faster and more reliable and then was applied to smart distribution grids to verify the results for it. The new 10 sample window method was adapted into the pilot protection program and its performance for the test bed system operation was tabulated. Following that the system comparison between the hardware results for the same algorithm and the simulation results were compared. The development of the dual slope percentage differential method, its comparison with the 10 sample average window pilot protection system and the effects of CT saturation on the pilot protection system are also shown in this thesis. The implementation of the 10 sample average window pilot protection system is done to multiple distribution grids like Green Hub v4.3, IEEE 34, LSSS loop and modified LSSS loop. Case studies of these multi-terminal model are presented, and the results are also shown in this thesis. The result obtained shows that the new algorithm for the previously proposed protection system successfully identifies fault on the test bed and the results for both hardware and software simulations match and the response time is approximately less than quarter of a cycle which is fast as compared to the present commercial protection system and satisfies the FREEDM system requirement.

  6. 40 CFR 60.273 - Emission monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Inspecting the baghouse for air leaks, torn or broken bags or filter media, or any other condition that may....273 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... installs and continuously operates a bag leak detection system according to paragraph (e) of this section...

  7. 40 CFR 60.273 - Emission monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Inspecting the baghouse for air leaks, torn or broken bags or filter media, or any other condition that may....273 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... installs and continuously operates a bag leak detection system according to paragraph (e) of this section...

  8. 40 CFR 60.273 - Emission monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Inspecting the baghouse for air leaks, torn or broken bags or filter media, or any other condition that may....273 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... installs and continuously operates a bag leak detection system according to paragraph (e) of this section...

  9. ADVANCEMENT OF THE RHIC BEAM ABORT KICKER SYSTEM.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ZHANG,W.AHRENS,L.MI,J.OERTER,B.SANDBERG,J.WARBURTON,D.

    2003-05-12

    As one of the most critical system for RHIC operation, the beam abort kicker system has to be highly available, reliable, and stable for the entire operating range. Along with the RHIC commission and operation, consistent efforts have been spend to cope with immediate issues as well as inherited design issues. Major design changes have been implemented to achieve the higher operating voltage, longer high voltage hold-off time, fast retriggering and redundant triggering, and improved system protection, etc. Recent system test has demonstrated for the first time that both blue ring and yellow ring beam abort systems have achieved moremore » than 24 hours hold off time at desired operating voltage. In this paper, we report break down, thyratron reverse arcing, and to build a fast re-trigger system to reduce beam spreading in event of premature discharge.« less

  10. Development, installation, and testing services for an automatic, point type thermal sensor, fire protection system on a mining dozer. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lease, W.D.

    1976-08-01

    Lease AFEX, Inc., modified its standard design of an automatic fire protection system used in the past on logging equipment, and long-term, in-mine tested system on a Fiat-Alli's HD-41B dozer at the Lemmons and Company coal mine, Boonville, Ind. The modification of the standard AFEX system involved improving the actuation device. The AFEX system is called a point-type thermal sensor, automatic fire protection system. The in-mine test took place in late 1975, and early 1976. The system was then tested by simulating a fire on the dozer. The system operated successfully after the 4 months of in-mine endurance testing. (Colormore » illustrations reproduced in black and white.)« less

  11. In-vessel calibration of the imaging diagnostics for the real-time protection of the JET ITER-like wall.

    PubMed

    Huber, V; Huber, A; Kinna, D; Balboa, I; Collins, S; Conway, N; Drewelow, P; Maggi, C F; Matthews, G F; Meigs, A G; Mertens, Ph; Price, M; Sergienko, G; Silburn, S; Wynn, A; Zastrow, K-D

    2016-11-01

    The in situ absolute calibration of the JET real-time protection imaging system has been performed for the first time by means of radiometric light source placed inside the JET vessel and operated by remote handling. High accuracy of the calibration is confirmed by cross-validation of the near infrared (NIR) cameras against each other, with thermal IR cameras, and with the beryllium evaporator, which lead to successful protection of the JET first wall during the last campaign. The operation temperature ranges of NIR protection cameras for the materials used on JET are Be 650-1600 °C, W coating 600-1320 °C, and W 650-1500 °C.

  12. In-vessel calibration of the imaging diagnostics for the real-time protection of the JET ITER-like wall

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huber, V., E-mail: V.Huber@fz-juelich.de; Huber, A.; Mertens, Ph.

    The in situ absolute calibration of the JET real-time protection imaging system has been performed for the first time by means of radiometric light source placed inside the JET vessel and operated by remote handling. High accuracy of the calibration is confirmed by cross-validation of the near infrared (NIR) cameras against each other, with thermal IR cameras, and with the beryllium evaporator, which lead to successful protection of the JET first wall during the last campaign. The operation temperature ranges of NIR protection cameras for the materials used on JET are Be 650-1600 °C, W coating 600-1320 °C, and W 650-1500 °C.

  13. Operational Protection from Unmanned Aerial Systems

    DTIC Science & Technology

    2015-05-15

    future threat posed by adversary UAS to U.S. forces, both in the form of system capabilities and methods of employment . It also addresses present...both in the form of system capabilities and methods of employment . It also addresses present counter UAS capabilities and recommends ways and means to...capabilities and methods of employment . It also addresses present counter UAS capabilities and recommends ways and means to provide better operational

  14. Integration & Validation of LCU with Different Sub-systems for Diacrode based amplifier

    NASA Astrophysics Data System (ADS)

    Rajnish, Kumar; Verma, Sriprakash; Soni, Dipal; Patel, Hriday; Suthar, Gajendra; Dalicha, Hrushikesh; Dhola, Hitesh; Patel, Amit; Upadhayay, Dishang; Jha, Akhil; Patel, Manoj; Trivedi, Rajesh; Machchhar, Harsha; Singh, Raghuraj; Mukherjee, Aparajita

    2017-04-01

    ITER-India is responsible to deliver nine (8+1 spare) ICH & CD Power Sources to ITER. Each power source is capable to deliver 2.5 MW at 35 to 65 MHz frequency range with a load condition up to VSWR 2:1. For remote operation of different subsystems, Local Control Unit (LCU) is developed. LCU is developed using PXI hardware and Schneider PLC with Lab VIEW-RT developmental environment. All the protection function of the amplifier is running on PXI 7841 R module that ensures hard wired protection logic. There are three level of protection function- first by power supply itself that detects overcurrent/overvoltage and trips itself and generate trip signal for further action. There are some direct hardwired signal interfaces between power supplies to protect the amplifier. Second level of protection is generated through integrated controller of amplifier i.e. Command Control Embedded (CCE) against arc and Anode over current. Third level of Protection is through LCU where different fault signals are received and processed to generate off command for different sub-systems. Before connecting different subsystem with High power RF amplifiers (Driver & Final stage), each subsystem is individually tested through LCU. All protection functions are tested before hooking up the subsystems with main amplifier and initiating RF operation.

  15. 40 CFR 63.7736 - How do I demonstrate initial compliance with the operation and maintenance requirements that...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... will inspect, operate, and maintain each capture system according to the procedures in the plan. (2... will inspect, operate, and maintain each control device according to the procedures in the plan. (c... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS...

  16. Remotely operated high pressure valve protects test personnel

    NASA Technical Reports Server (NTRS)

    Howland, B. T.

    1967-01-01

    High pressure valve used in testing certain spacecraft systems is safely opened and closed by a remotely stationed operator. The valve is self-regulating in that if the incoming pressure drops below a desired value the valve will automatically close, warning the operator that the testing pressure has dropped to an undesired level.

  17. Insect contamination protection for laminar flow surfaces

    NASA Technical Reports Server (NTRS)

    Croom, Cynthia C.; Holmes, Bruce J.

    1986-01-01

    The ability of modern aircraft surfaces to achieve laminar flow was well-accepted in recent years. Obtaining the maximum benefit of laminar flow for aircraft drag reduction requires maintaining minimum leading-edge contamination. Previously proposed insect contamination prevention methods have proved impractical due to cost, weight, or inconvenience. Past work has shown that insects will not adhere to water-wetted surfaces, but the large volumes of water required for protection rendered such a system impractical. The results of a flight experiment conducted by NASA to evaluate the performance of a porous leading-edge fluid discharge ice protection system operated as an insect contamination protections system are presented. In addition, these flights explored the environmental and atmospheric conditions most suitable for insect accumulation.

  18. Determining the Impact of Steady-State PV Fault Current Injections on Distribution Protection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seuss, John; Reno, Matthew J.; Broderick, Robert Joseph

    This report investigates the fault current contribution from a single large PV system and the impact it has on existing distribution overcurrent protection devices. Assumptions are made about the modeling of the PV system under fault to perform exhaustive steady - state fault analyses throughout distribution feeder models. Each PV interconnection location is tested to determine how the size of the PV system affects the fault current measured by each protection device. This data is then searched for logical conditions that indicate whether a protection device has operated in a manner that will cause more customer outages due to themore » addition of the PV system. This is referred to as a protection issue , and there are four unique types of issues that have been identified in the study. The PV system size at which any issues occur are recorded to determine the feeder's PV hosting capacity limitations due to interference with protection settings. The analysis is carried out on six feeder models. The report concludes with a discussion of the prevalence and cause of each protection issue caused by PV system fault current.« less

  19. The Langley thermal protection system test facility: A description including design operating boundaries

    NASA Technical Reports Server (NTRS)

    Klich, G. F.

    1976-01-01

    A description of the Langley thermal protection system test facility is presented. This facility was designed to provide realistic environments and times for testing thermal protection systems proposed for use on high speed vehicles such as the space shuttle. Products from the combustion of methane-air-oxygen mixtures, having a maximum total enthalpy of 10.3 MJ/kg, are used as a test medium. Test panels with maximum dimensions of 61 cm x 91.4 cm are mounted in the side wall of the test region. Static pressures in the test region can range from .005 to .1 atm and calculated equilibrium temperatures of test panels range from 700 K to 1700 K. Test times can be as long as 1800 sec. Some experimental data obtained while using combustion products of methane-air mixtures are compared with theory, and calibration of the facility is being continued to verify calculated values of parameters which are within the design operating boundaries.

  20. Operation Protective Edge - A Unique Challenge for a Civilian EMS Agency.

    PubMed

    Jaffe, Eli; Strugo, Refael; Wacht, Oren

    2015-10-01

    During July through August 2014, Operation Protective Edge, a military conflict between Israel and the Hamas regime in Gaza, dramatically affected both populations. Magen David Adom (MDA), the Israeli national Emergency Medical Service (EMS) and a member of the Red Cross, faced a unique challenge during the conflict: to continue providing crucial service to the entire civilian population of Israel, which was under constant missile threat. This challenge included not only providing immediate care for routine EMS calls under missile threat, but also preparing and delivering immediate care to civilians injured in attacks on major cities, as well as small communities, in Israel. This task is a challenge for a civilian EMS agency that normally operates in a non-military environment, yet, in an instant, must enhance its capability to respond to a considerable threat to its population. During Operation Protective Edge, MDA provided care for 842 wounded civilians and utilized a significant amount of its resources. Providing EMS services for a civilian population in a mixed civilian/military scenario is a challenging task on a national level for an EMS system, especially when the threat lasts for weeks. This report describes MDA's preparedness and operations during Operation Protective Edge, and the unique EMS challenges and dilemmas the agency faced.

  1. AN OPERATIONAL EVALUATION OF THE ETA - CMAQ AIR QUALITY FORECAST MODEL

    EPA Science Inventory

    The National Oceanic and Atmospheric Administration (NOAA), in partnership with the United States Environmental Protection Agency (EPA), are developing an operational, nationwide Air Quality Forecasting (AQF) system. An experimental phase of this program, which couples NOAA's Et...

  2. AN OPERATIONAL EVALUATION OF THE ETA-CMAQ AIR QUALITY FORECAST MODEL

    EPA Science Inventory

    The National Oceanic and Atmospheric Administration (NOAA), in collaboration with the Environmental Protection Agency (EPA), are developing an Air Quality Forecasting Program that will eventually result in an operational Nationwide Air Quality Forecasting System. The initial pha...

  3. Combined Pressure and Thermal Window System for Space Vehicles

    NASA Technical Reports Server (NTRS)

    Svartstrom, Kirk Nils (Inventor)

    2015-01-01

    A window system for a vehicle comprising a pressure and thermal window pane, a seal system, and a retainer system. The pressure and thermal window pane may be configured to provide desired pressure protection and desired thermal protection when exposed to an environment around the vehicle during operation of the vehicle. The pressure and thermal window pane may have a desired ductility. The seal system may be configured to contact the pressure and thermal window pane to seal the pressure and thermal window pane. The retainer system may be configured to hold the seal system and the pressure and thermal window pane.

  4. Combined Pressure and Thermal Window System for Space Vehicles

    NASA Technical Reports Server (NTRS)

    Svartstrom, Kirk Nils (Inventor)

    2017-01-01

    A window system for a vehicle comprising a pressure and thermal window pane, a seal system, and a retainer system. The pressure and thermal window pane may be configured to provide desired pressure protection and desired thermal protection when exposed to an environment around the vehicle during operation of the vehicle. The pressure and thermal window pane may have a desired ductility. The seal system may be configured to contact the pressure and thermal window pane to seal the pressure and thermal window pane. The retainer system may be configured to hold the seal system and the pressure and thermal window pane.

  5. Transmission system protection screening for integration of offshore wind power plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sajadi, A.; Strezoski, L.; Clark, K.

    This paper develops an efficient methodology for protection screening of large-scale transmission systems as part of the planning studies for the integration of offshore wind power plants into the power grid. This methodology avails to determine whether any upgrades are required to the protection system. The uncertainty is considered in form of variability of the power generation by offshore wind power plant. This paper uses the integration of a 1000 MW offshore wind power plant operating in Lake Erie into the FirstEnergy/PJM service territory as a case study. This study uses a realistic model of a 63,000-bus test system thatmore » represents the U.S. Eastern Interconnection.« less

  6. Transmission system protection screening for integration of offshore wind power plants

    DOE PAGES

    Sajadi, A.; Strezoski, L.; Clark, K.; ...

    2018-02-21

    This paper develops an efficient methodology for protection screening of large-scale transmission systems as part of the planning studies for the integration of offshore wind power plants into the power grid. This methodology avails to determine whether any upgrades are required to the protection system. The uncertainty is considered in form of variability of the power generation by offshore wind power plant. This paper uses the integration of a 1000 MW offshore wind power plant operating in Lake Erie into the FirstEnergy/PJM service territory as a case study. This study uses a realistic model of a 63,000-bus test system thatmore » represents the U.S. Eastern Interconnection.« less

  7. Protecting clinical data on Web client computers: the PCASSO approach.

    PubMed Central

    Masys, D. R.; Baker, D. B.

    1998-01-01

    The ubiquity and ease of use of the Web have made it an increasingly popular medium for communication of health-related information. Web interfaces to commercially available clinical information systems are now available or under development by most major vendors. To the extent that such interfaces involve the use of unprotected operating systems, they are vulnerable to security limitations of Web client software environments. The Patient Centered Access to Secure Systems Online (PCASSO) project extends the protections for person-identifiable health data on Web client computers. PCASSO uses several approaches, including physical protection of authentication information, execution containment, graphical displays, and monitoring the client system for intrusions and co-existing programs that may compromise security. PMID:9929243

  8. Implementation of the MPC and A Operations Monitoring (MOM) System at IRT-T FSRE Nuclear Power Institute (NPI)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sitdikov,I.; Zenkov, A.; Tsibulnikov, Y.

    The Material Protection, Control and Accounting (MPC&A) Program has been working since 1994 with nuclear sites in Russia to upgrade the physical protection (PP) and material control and accounting (MC&A) functions at facilities containing weapons usable nuclear material. In early 2001, the MPC&A program initiated the MPC&A Operations Monitoring (MOM) Project to monitor facilities where MPC&A upgrades have been installed to provide increased confidence that personnel are present and vigilant, provide confidence that security procedures are being properly performed and provide additional assurance that nuclear materials have not been stolen. The MOM project began as a pilot project at themore » Moscow State Engineering Physics Institute (MEPhI) and a MOM system was successfully installed in October 2001. Following the success of the MEPhI pilot project, the MPC&A Program expanded the installation of MOM systems to several other Russian facilities, including the Nuclear Physics Institute (NPI) in Tomsk. The MOM system was made operational at NPI in October 2004. This paper is focused on the experience gained from operation of this system and the objectives of the MOM system. The paper also describes how the MOM system is used at NPI and, in particular, how the data is analyzed. Finally, potential expansion of the MOM system at NPI is described.« less

  9. Improvement in operational characteristics of KEPCO’s line-commutation-type superconducting hybrid fault current limiter

    NASA Astrophysics Data System (ADS)

    Yim, S.-W.; Park, B.-C.; Jeong, Y.-T.; Kim, Y.-J.; Yang, S.-E.; Kim, W.-S.; Kim, H.-R.; Du, H.-I.

    2013-01-01

    A 22.9 kV class hybrid fault current limiter (FCL) developed by Korea Electric Power Corporation and LS Industrial Systems in 2006 operates using the line commutation mechanism and begins to limit the fault current after the first half-cycle. The first peak of the fault current is available for protective coordination in the power system. However, it also produces a large electromagnetic force and imposes a huge stress on power facilities such as the main transformer and gas-insulated switchgear. In this study, we improved the operational characteristics of the hybrid FCL in order to reduce the first peak of the fault current. While maintaining the structure of the hybrid FCL system, we developed a superconducting module that detects and limits the fault current during the first half-cycle. To maintain the protective coordination capacity, the hybrid FCL was designed to reduce the first peak value of the fault current by up to approximately 30%. The superconducting module was also designed to produce a minimum AC loss, generating a small, uniform magnetic field distribution during normal operation. Performance tests confirmed that when applied to the hybrid FCL, the superconducting module showed successful current limiting operation without any damage.

  10. Apollo/Saturn C00.00.19.3 operations and maintenance. Cathodic protection of communication cables

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Operating and maintenance instructions for cathodic protection of communication cables at the Cape Kennedy Launch Complex are presented. The system is designed to prevent or arrest corrosion of communication cables buried in soil or submerged in water by impressing sufficient direct current from the rectifier through the anodes to the cable. This process neutralizes or counteracts current flowing from the cable into the soil or water, thus preventing or arresting corrosion of the cable sheath material.

  11. Use of an Acoustic Camera to Evaluate the Performance of Tickler Chains and Draghead Deflectors for Sea Turtle Protection during Hopper Dredging in the United States of America

    DTIC Science & Technology

    2018-05-01

    performance nor effectiveness in protecting sea turtles has been documented.This study was the first step in evaluating TTC as a potential replacement for...draghead turtle deflectors. The primary objective was to evaluate and document operational performance of this technology, not effectiveness of reducing...incidental take. TTC operational performance was monitored using underwater camera systems over a short period of time whereas effectiveness for

  12. 40 CFR 63.983 - Closed vent systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Closed vent systems. 63.983 Section 63... Emission Standards for Closed Vent Systems, Control Devices, Recovery Devices and Routing to a Fuel Gas System or a Process § 63.983 Closed vent systems. (a) Closed vent system equipment and operating...

  13. 49 CFR 192.195 - Protection against accidental overpressuring.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of §§ 192.199 and 192.201. (b) Additional requirements for distribution systems. Each distribution..., load, and other service conditions that will be experienced in normal operation of the system, and that...

  14. Develop an Indoor Air Quality Program in Your School

    EPA Pesticide Factsheets

    Effective cleaning and maintenance procedures are critical to protecting building systems and building occupants. Student, teacher and staff health and productivity can suffer when school building systems fail to operate as designed

  15. Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS)

    DTIC Science & Technology

    2012-05-01

    protect, and secure the United States and its interests. • AOF is the United States, Alaska, Canada, Mexico, Bahamas, Puerto Rico , and the U.S. Virgin...Criteria (UFC) for Smart Microgrid Cyber design guides for Industrial Control Systems (ICS) Residual systems Operations and Maintenance Operator...Training Sustainment Commercial Transition Cooperation with NIST for microgrid security standards Working with industry associations and

  16. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63—Requirements for...

  17. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...

  18. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...

  19. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 13 2014-07-01 2014-07-01 false Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...

  20. Environmental Control and Life Support Systems for Mars Exploration: Issues and Concerns for Planetary Protection and the Protection of Science

    NASA Astrophysics Data System (ADS)

    Barta, Daniel J.; Lange, Kevin; Anderson, Molly; Vonau, Walter

    2016-07-01

    Planetary protection represents an additional set of requirements that generally have not been considered by developers of technologies for Environmental Control and Life Support Systems (ECLSS). Forward contamination concerns will affect release of gases and discharge of liquids and solids, including what may be left behind after planetary vehicles are abandoned upon return to Earth. A crew of four using a state of the art ECLSS could generate as much as 4.3 metric tons of gaseous, liquid and solid wastes and trash during a 500-day surface stay. These may present issues and concerns for both planetary protection and planetary science. Certainly, further closure of ECLSS systems will be of benefit by greater reuse of consumable products and reduced generation of waste products. It can be presumed that planetary protection will affect technology development by constraining how technologies can operate: limiting or prohibiting certain kinds of operations or processes (e.g. venting); necessitating that other kinds of operations be performed (e.g. sterilization; filtration of vent lines); prohibiting what can be brought on a mission (e.g. extremophiles); creating needs for new capabilities/ technologies (e.g. containment). Although any planned venting could include filtration to eliminate micro-organisms from inadvertently exiting the spacecraft, it may be impossible to eliminate or filter habitat structural leakage. Filtration will add pressure drops impacting size of lines and ducts, affect fan size and energy requirements, and add consumable mass. Technologies that may be employed to remove biomarkers and microbial contamination from liquid and solid wastes prior to storage or release may include mineralization technologies such as incineration, super critical wet oxidation and pyrolysis. These technologies, however, come with significant penalties for mass, power and consumables. This paper will estimate the nature and amounts of materials generated during Mars transit and surface stays that may be impacted by planetary protection requirements or be controlled for the protection of planetary science.

Top