Sample records for provide continuous operation

  1. Ten ways for provider units to weather this economic downturn.

    PubMed

    Bernard, Amy

    2009-05-01

    The current economic recession challenges all continuing nursing education provider units to review operational practices and explore ways to maintain and ensure financial viability. Adjustments in programs are likely, as nurses seek more cost-effective ways of meeting their continuing education requirements. Further, employers are reducing staff and budgets. As a result, provider units need to reassess operations and refocus outcomes.

  2. Mastering the broadband challenge: next-generation SONET in a packet world

    NASA Astrophysics Data System (ADS)

    Farhi, Eyal

    2001-10-01

    The continuing liberalization of the world's telecommunications markets and the progressive convergence of voice, data, video and Internet communication are prompting telecommunication service providers to both expand and enhance their service capabilities. As bandwidth-hungry applications proliferate, and the demand for data and data services grows, the requirement for broadband communications appears to be insatiable. To provide the expected level of service in this environment of rapidly increasing demand, telcos and service providers must invest in an expanded network. However, to remain competitive and profitable, they must also continue to leverage their existing infrastructure investment. This paper will examine the current challenges network operators are facing today with the deployment of broadband technologies as they strive to maintain existing infrastructure investments while providing new services to their customers and developing added value network operations. This paper will explore various broadband technologies (optical/wireless) that operate on the primary SDH/SONET standards, their topologies and inherent benefits, which provide operators with solutions to the broadband challenge. New customer demands, such as high-speed Data transmissions (increased Internet use), coupled with operators' continuous need for network optimization, have thrown a wrench into daily operations. Therefore, the need to modernize existing networks has become paramount.

  3. 41 CFR 102-192.80 - How do we develop written security policies and plans?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION...) Operating procedures; (d) Plan to provide a visible mail screening operation; (e) Training mail center...) Managing threats; (h) Communications plan; (i) Occupant Emergency Plan (OEP); (j) Continuity of Operations...

  4. 40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  5. 40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  6. 40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  7. 40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  8. Terra Mission Operations: Launch to the Present (and Beyond)

    NASA Technical Reports Server (NTRS)

    Kelly, Angelita; Moyer, Eric; Mantziaras, Dimitrios; Case, Warren

    2014-01-01

    The Terra satellite, flagship of NASA's long-term Earth Observing System (EOS) Program, continues to provide useful earth science observations well past its 5-year design lifetime. This paper describes the evolution of Terra operations, including challenges and successes and the steps taken to preserve science requirements and prolong spacecraft life. Working cooperatively with the Terra science and instrument teams, including NASA's international partners, the mission operations team has successfully kept the Terra operating continuously, resolving challenges and adjusting operations as needed. Terra retains all of its observing capabilities (except Short Wave Infrared) despite its age. The paper also describes concepts for future operations. This paper will review the Terra spacecraft mission successes and unique spacecraft component designs that provided significant benefits extending mission life and science. In addition, it discusses special activities as well as anomalies and corresponding recovery efforts. Lastly, it discusses future plans for continued operations.

  9. Mission operations and command assurance: Flight operations quality improvements

    NASA Technical Reports Server (NTRS)

    Welz, Linda L.; Bruno, Kristin J.; Kazz, Sheri L.; Potts, Sherrill S.; Witkowski, Mona M.

    1994-01-01

    Mission Operations and Command Assurance (MO&CA) is a Total Quality Management (TQM) task on JPL projects to instill quality in flight mission operations. From a system engineering view, MO&CA facilitates communication and problem-solving among flight teams and provides continuous solving among flight teams and provides continuous process improvement to reduce risk in mission operations by addressing human factors. The MO&CA task has evolved from participating as a member of the spacecraft team, to an independent team reporting directly to flight project management and providing system level assurance. JPL flight projects have benefited significantly from MO&CA's effort to contain risk and prevent rather than rework errors. MO&CA's ability to provide direct transfer of knowledge allows new projects to benefit from previous and ongoing flight experience.

  10. 50 CFR 300.219 - Vessel monitoring system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... The vessel owner and operator shall continuously operate the VMS unit at all times, except that the...) of this section, provided that the VMS unit is operated continuously and at all times while the... device that is capable of real-time communication with the SAC. The VMS unit used to fulfill the...

  11. 50 CFR 300.219 - Vessel monitoring system.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... The vessel owner and operator shall continuously operate the VMS unit at all times, except that the...) of this section, provided that the VMS unit is operated continuously and at all times while the... device that is capable of real-time communication with the SAC. The VMS unit used to fulfill the...

  12. 50 CFR 300.219 - Vessel monitoring system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... The vessel owner and operator shall continuously operate the VMS unit at all times, except that the...) of this section, provided that the VMS unit is operated continuously and at all times while the... device that is capable of real-time communication with the SAC. The VMS unit used to fulfill the...

  13. Fossil fuel furnace reactor

    DOEpatents

    Parkinson, William J.

    1987-01-01

    A fossil fuel furnace reactor is provided for simulating a continuous processing plant with a batch reactor. An internal reaction vessel contains a batch of shale oil, with the vessel having a relatively thin wall thickness for a heat transfer rate effective to simulate a process temperature history in the selected continuous processing plant. A heater jacket is disposed about the reactor vessel and defines a number of independent controllable temperature zones axially spaced along the reaction vessel. Each temperature zone can be energized to simulate a time-temperature history of process material through the continuous plant. A pressure vessel contains both the heater jacket and the reaction vessel at an operating pressure functionally selected to simulate the continuous processing plant. The process yield from the oil shale may be used as feedback information to software simulating operation of the continuous plant to provide operating parameters, i.e., temperature profiles, ambient atmosphere, operating pressure, material feed rates, etc., for simulation in the batch reactor.

  14. EPA Library Disaster Response and Continuity of Operations (COOP) Procedures

    EPA Pesticide Factsheets

    To establish Agency-wide procedures for the EPA National Library Network libraries to mitigate, prepare for, respond to, and recover from disasters in EPA libraries and provide continuing operations during and after a disaster.

  15. Supply Operations (DLA-O) Total Quality Management (TQM) Master Plan

    DTIC Science & Technology

    1989-07-01

    This document briefly outlines the DLA Directorate of Supply Operations plan to implement total quality management . It seeks to provide better...service to customers at a lower cost through continuous process improvement and commitment from everyone in the organization. Keywords: TQM (total Quality Management ), Supply operations; Continuous process improvement. (KR)

  16. Integrating UF6 Cylinder RF Tracking With Continuous Load Cell Monitoring for Verifying Declared UF6 Feed and Withdrawal Operations Verifying Declared UF6 Feed and Withdrawal Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krichinsky, Alan M; Miller, Paul; Pickett, Chris A

    2009-01-01

    Oak Ridge National Laboratory is demonstrating the integration of UF6 cylinder tracking, using RF technology, with continuous load cell monitoring (CLCM) at mock UF6 feed and withdrawal (F&W) stations. CLCM and cylinder tracking are two of several continuous-monitoring technologies that show promise in providing integrated safeguards of F&W operations at enrichment plants. Integrating different monitoring technologies allows advanced, automated event processing to screen innocuous events thereby minimizing false alerts to independent inspectors. Traditionally, international inspectors rely on batch verification of material inputs and outputs derived from operator declarations and periodic on-site inspections at uranium enrichment plants or other nuclear processingmore » facilities. Continuously monitoring F&W activities between inspections while providing filtered alerts of significant operational events will substantially increase the amount of valuable information available to inspectors thereby promising to enhance the effectiveness of safeguards and to improve efficiency in conducting on-site inspections especially at large plants for ensuring that all operations are declared.« less

  17. 47 CFR 90.429 - Control point and dispatch point requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... 90.429 Section 90.429 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND...-operated device which will provide continuous visual indication when the transmitter is radiating, or, a pilot lamp or meter which will provide continuous visual indication when the transmitter circuits have...

  18. Continuous downstream processing for high value biological products: A Review.

    PubMed

    Zydney, Andrew L

    2016-03-01

    There is growing interest in the possibility of developing truly continuous processes for the large-scale production of high value biological products. Continuous processing has the potential to provide significant reductions in cost and facility size while improving product quality and facilitating the design of flexible multi-product manufacturing facilities. This paper reviews the current state-of-the-art in separations technology suitable for continuous downstream bioprocessing, focusing on unit operations that would be most appropriate for the production of secreted proteins like monoclonal antibodies. This includes cell separation/recycle from the perfusion bioreactor, initial product recovery (capture), product purification (polishing), and formulation. Of particular importance are the available options, and alternatives, for continuous chromatographic separations. Although there are still significant challenges in developing integrated continuous bioprocesses, recent technological advances have provided process developers with a number of attractive options for development of truly continuous bioprocessing operations. © 2015 Wiley Periodicals, Inc.

  19. Calibration of the Thermal Infrared Sensor on the Landsat Data Continuity Mission

    NASA Technical Reports Server (NTRS)

    Thome, K; Reuter, D.; Lunsford, D.; Montanaro, M.; Smith, J.; Tesfaye, Z.; Wenny, B.

    2011-01-01

    The Landsat series of satellites provides the longest running continuous data set of moderate-spatial-resolution imagery beginning with the launch of Landsat 1 in 1972 and continuing with the 1999 launch of Landsat 7 and current operation of Landsats 5 and 7. The Landsat Data Continuity Mission (LDCM) will continue this program into a fourth decade providing data that are keys to understanding changes in land-use changes and resource management. LDCM consists of a two-sensor platform comprised of the Operational Land Imager (OLI) and Thermal Infrared Sensors (TIRS). A description of the applications and design of the TIRS instrument is given as well as the plans for calibration and characterization. Included are early results from preflight calibration and a description of the inflight validation.

  20. 24 CFR 969.104 - Continuing eligibility for operating subsidy.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... in accordance with an ACC amendment providing for extension of the term of the ACC provisions related to project operation, pursuant to § 969.105 or § 969.106. The ACC amendment shall be in the form prescribed by HUD and shall specify the particular provisions of the ACC which relate to continued project...

  1. 24 CFR 969.104 - Continuing eligibility for operating subsidy.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... in accordance with an ACC amendment providing for extension of the term of the ACC provisions related to project operation, pursuant to § 969.105 or § 969.106. The ACC amendment shall be in the form prescribed by HUD and shall specify the particular provisions of the ACC which relate to continued project...

  2. 75 FR 39017 - Pilot Corporation, Propeller Corp., and Flying J Inc.; Analysis of Proposed Agreement Containing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-07

    ... restaurants, shower facilities, internet access, and financial services for drivers. Four travel center... for assuring that the firewall protocols are met. B. Continued Operation of Restaurants The Order also provides for the continuity of operation at Wendy's restaurants affiliated with the sites acquired by Love...

  3. Municipal resilience: A paradigm shift in emergency and continuity management.

    PubMed

    Solecki, Greg; Luchia, Mike

    More than a decade of emergency and continuity management vision was instrumental in providing the unprecedented level of response and recovery from the great flood of 2013. Earlier assessments, planning and validation promulgated development of corporate continuity, emergency and contingency plans along with tactical, strategic and recovery operations centres that all led to a reliable emergency management model that will continue to provide the backbone for municipal resilience.

  4. 47 CFR 76.1205 - CableCARD support.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND... operate with multichannel video programming systems shall be provided by the system operator upon request in a timely manner. (b) A multichannel video programming provider that is subject to the requirements...

  5. LANL continuity of operations plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Senutovitch, Diane M

    2010-12-22

    The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratorymore » EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may be required to support an allhazards event, including a national security emergency, major fire, catastrophic natural disaster, man-made disaster, terrorism event, or technological disaster by rendering LANL buildings, infrastructure, or Technical Areas unsafe, temporarily unusable, or inaccessible.« less

  6. PYROLASER - PYROLASER OPTICAL PYROMETER OPERATING SYSTEM

    NASA Technical Reports Server (NTRS)

    Roberts, F. E.

    1994-01-01

    The PYROLASER package is an operating system for the Pyrometer Instrument Company's Pyrolaser. There are 6 individual programs in the PYROLASER package: two main programs, two lower level subprograms, and two programs which, although independent, function predominantly as macros. The package provides a quick and easy way to setup, control, and program a standard Pyrolaser. Temperature and emissivity measurements may be either collected as if the Pyrolaser were in the manual operations mode, or displayed on real time strip charts and stored in standard spreadsheet format for post-test analysis. A shell is supplied to allow macros, which are test-specific, to be easily added to the system. The Pyrolaser Simple Operation program provides full on-screen remote operation capabilities, thus allowing the user to operate the Pyrolaser from the computer just as it would be operated manually. The Pyrolaser Simple Operation program also allows the use of "quick starts". Quick starts provide an easy way to permit routines to be used as setup macros for specific applications or tests. The specific procedures required for a test may be ordered in a sequence structure and then the sequence structure can be started with a simple button in the cluster structure provided. One quick start macro is provided for continuous Pyrolaser operation. A subprogram, Display Continuous Pyr Data, is used to display and store the resulting data output. Using this macro, the system is set up for continuous operation and the subprogram is called to display the data in real time on strip charts. The data is simultaneously stored in a spreadsheet format. The resulting spreadsheet file can be opened in any one of a number of commercially available spreadsheet programs. The Read Continuous Pyrometer program is provided as a continuously run subprogram for incorporation of the Pyrolaser software into a process control or feedback control scheme in a multi-component system. The program requires the Pyrolaser to be set up using the Pyrometer String Transfer macro. It requires no inputs and provides temperature and emissivity as outputs. The Read Continuous Pyrometer program can be run continuously and the data can be sampled as often or as seldom as updates of temperature and emissivity are required. PYROLASER is written using the Labview software for use on Macintosh series computers running System 6.0.3 or later, Sun Sparc series computers running OpenWindows 3.0 or MIT's X Window System (X11R4 or X11R5), and IBM PC or compatibles running Microsoft Windows 3.1 or later. Labview requires a minimum of 5Mb of RAM on a Macintosh, 24Mb of RAM on a Sun, and 8Mb of RAM on an IBM PC or compatible. The Labview software is a product of National Instruments (Austin,TX; 800-433-3488), and is not included with this program. The standard distribution medium for PYROLASER is a 3.5 inch 800K Macintosh format diskette. It is also available on a 3.5 inch 720K MS-DOS format diskette, a 3.5 inch diskette in UNIX tar format, and a .25 inch streaming magnetic tape cartridge in UNIX tar format. An electronic copy of the documentation in Macintosh WordPerfect version 2.0.4 format is included on the distribution medium. Printed documentation is included in the price of the program. PYROLASER was developed in 1992.

  7. Seismology in Lebanon

    NASA Astrophysics Data System (ADS)

    Hamilton, Robert M.; Rouhbon, Badaovi

    During the last several years, while civil war raged in Lebanon, the Bhannes seismograph station near Beirut continued to operate and provide seismograms and phase readings on a regular basis.Seismologists around the world owe gratitude to Charles Tabet, an employee of both the Lebanon National Council for Scientific Research (NCSR) and the American University of Beirut, for his daily dedication to maintaining the station's operations. In addition, Iskandar Sursock, also of the NCSR, has provided essential support and personal resources to continue the seismological program in Lebanon.

  8. 47 CFR 80.1155 - Radioprinter.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... operations. (3) Only those communications which are associated with the business and operational needs of the... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE... operations provide record communications between authorized maritime mobile stations. (a) Supplementary...

  9. Emerging Technologies for Real-Time Continuous Monitoring of Wellbore Integrity

    NASA Astrophysics Data System (ADS)

    Freifeld, B. M.

    2017-12-01

    Assessment of a well's integrity has traditionally been carried out through periodic wireline logging, often performed only when an operational problem was noted at the surface. There are several emerging technologies that can be installed permanently as part of the well completion and offer the ability to monitor operations while providing continuous indicators to evaluate the structural health of a well. Permanent behind casing instrumentation, such as pressure and temperature gauges can monitor for behind casing leakage. Similarly, fiber-optic distributed temperature and acoustic sensing provide additional information for assessing unwanted movement of fluid, which is indicative of problems either inside or outside of casing. Furthermore, these technologies offer the benefit of providing real-time continuous streams of information that serve as leading-indicators of wellbore problems to allow for early intervention. Additional research is still needed to develop best practices for the installation and operation of these technologies, as they increase cost and add additional risks that must be managed.

  10. KSC-2009-3842

    NASA Image and Video Library

    2009-06-25

    CAPE CANAVERAL, Fla. – Bart Hagemeyer, at left, meteorologist in charge, NOAA National Weather Service forecast office, Melbourne, Fla., and Joel Tumbiolo, Delta IV launch weather officer, 45th Weather Squadron, Cape Canaveral Air Force Station, participate in a prelaunch news conference on the Geostationary Operational Environmental Satellite-O mission in NASA's Kennedy Space Center press site auditorium. The GOES-O satellite is targeted to launch June 26. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. Each of the GOES satellites continuously provides observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. Photo credit: NASA/Jim Grossmann

  11. 49 CFR 193.2713 - Training: operations and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...

  12. 49 CFR 193.2713 - Training: operations and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...

  13. 49 CFR 193.2713 - Training: operations and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...

  14. 49 CFR 193.2713 - Training: operations and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...

  15. 49 CFR 193.2713 - Training: operations and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...

  16. 46 CFR 151.40-10 - Operational requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... shall operate when either the pressure or the temperature exceeds the operating limits of the system... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES BARGES... Operational requirements. Control systems, required by Table 151.05 shall be provided with an audible or...

  17. 14 CFR 135.215 - IFR: Operating limitations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false IFR: Operating limitations. 135.215 Section 135.215 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... Operating Limitations and Weather Requirements § 135.215 IFR: Operating limitations. (a) Except as provided...

  18. 14 CFR 135.215 - IFR: Operating limitations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false IFR: Operating limitations. 135.215 Section 135.215 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... Operating Limitations and Weather Requirements § 135.215 IFR: Operating limitations. (a) Except as provided...

  19. 14 CFR 135.215 - IFR: Operating limitations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false IFR: Operating limitations. 135.215 Section 135.215 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... Operating Limitations and Weather Requirements § 135.215 IFR: Operating limitations. (a) Except as provided...

  20. 14 CFR 135.215 - IFR: Operating limitations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false IFR: Operating limitations. 135.215 Section 135.215 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... Operating Limitations and Weather Requirements § 135.215 IFR: Operating limitations. (a) Except as provided...

  1. 14 CFR 135.215 - IFR: Operating limitations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false IFR: Operating limitations. 135.215 Section 135.215 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... Operating Limitations and Weather Requirements § 135.215 IFR: Operating limitations. (a) Except as provided...

  2. Analysing the external supply chain risk driver competitiveness: a risk mitigation framework and business continuity plan.

    PubMed

    Blos, Mauricio F; Wee, Hui-Ming; Yang, Joshua

    2010-11-01

    Innovation challenges for handling supply chain risks have become one of the most important drivers in business competitiveness and differentiation. This study analyses competitiveness at the external supply chain level as a driver of risks and provides a framework for mitigating these risks. The mitigation framework, also called the supply chain continuity framework, provides insight into six stages of the business continuity planning (BCP) process life cycle (risk mitigation management, business impact analysis, supply continuity strategy development, supply continuity plan development, supply continuity plan testing and supply continuity plan maintenance), together with the operational constructs: customer service, inventory management, flexibility, time to market, ordering cycle time and quality. The purpose of the BCP process life cycle and operational constructs working together is to emphasise the way in which a supply chain can deal with disruption risks and, consequently, bring competitive advantage. Future research will consider the new risk scenarios and analyse the consequences to promote the improvement of supply chain resilience.

  3. Terra Mission Operations: Launch to the Present (and Beyond)

    NASA Technical Reports Server (NTRS)

    Thome, Kurt; Kelly, Angelita; Moyer, Eric; Mantziaras, Dimitrios; Case, Warren

    2014-01-01

    The Terra satellite, flagship of NASAs long-term Earth Observing System (EOS) Program, continues to provide useful earth science observations well past its 5-year design lifetime. This paper describes the evolution of Terra operations, including challenges and successes and the steps taken to preserve science requirements and prolong spacecraft life. Working cooperatively with the Terra science and instrument teams, including NASAs international partners, the mission operations team has successfully kept the Terra operating continuously, resolving challenges and adjusting operations as needed. Terra retains all of its observing capabilities (except Short Wave Infrared) despite its age. The paper also describes concepts for future operations.

  4. KSC-2009-2323

    NASA Image and Video Library

    2009-03-18

    CAPE CANAVERAL, Fla. – At the Astrotech payload processing facility in Titusville, Fla., technicians apply the NOAA decal to the fairing that will encapsulate the GOES-O satellite during launch. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. The GOES-O satellite is targeted to launch April 28 onboard a United Launch Alliance Delta IV expendable launch vehicle. Photo credit: NASA/Kim Shiflett

  5. KSC-2009-3637

    NASA Image and Video Library

    2009-06-09

    CAPE CANAVERAL, Fla. – On Launch Complex 37 at Cape Canaveral Air Force Station in Florida, the GOES-O satellite has been lifted into the mobile service tower. It has been mated with the United Launch Alliance Delta IV expendable launch vehicle. The GOES-O satellite is targeted to launch June 26. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. Photo credit: NASA/Kim Shiflett

  6. 46 CFR 112.39-3 - Operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Operation. 112.39-3 Section 112.39-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Battery Operated Lanterns § 112.39-3 Operation. (a) The lanterns must be capable of providing...

  7. 46 CFR 112.39-3 - Operation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Operation. 112.39-3 Section 112.39-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Battery Operated Lanterns § 112.39-3 Operation. (a) The lanterns must be capable of providing...

  8. 46 CFR 112.39-3 - Operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Operation. 112.39-3 Section 112.39-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Battery Operated Lanterns § 112.39-3 Operation. (a) The lanterns must be capable of providing...

  9. 46 CFR 112.39-3 - Operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Operation. 112.39-3 Section 112.39-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Battery Operated Lanterns § 112.39-3 Operation. (a) The lanterns must be capable of providing...

  10. 46 CFR 112.39-3 - Operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Operation. 112.39-3 Section 112.39-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Battery Operated Lanterns § 112.39-3 Operation. (a) The lanterns must be capable of providing...

  11. 78 FR 56980 - Muscle Shoals Reservation Redevelopment, Colbert County, Alabama

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-16

    ... protect the integrated operation of TVA reservoir and power systems, to provide for appropriate public use and enjoyment of the reservoir system, and to provide for continuing economic growth in the Tennessee... specific use agreements, such as easements. Because of environmental and reservoir operations constraints...

  12. Discovery Planetary Mission Operations Concepts

    NASA Technical Reports Server (NTRS)

    Coffin, R.

    1994-01-01

    The NASA Discovery Program of small planetary missions will provide opportunities to continue scientific exploration of the solar system in today's cost-constrained environment. Using a multidisciplinary team, JPL has developed plans to provide mission operations within the financial parameters established by the Discovery Program. This paper describes experiences and methods that show promise of allowing the Discovery Missions to operate within the program cost constraints while maintaining low mission risk, high data quality, and reponsive operations.

  13. Space station operations task force. Panel 2 report: Ground operations and support systems

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The Ground Operations Concept embodied in this report provides for safe multi-user utilization of the Space Station, eases user integration, and gives users autonomy and flexibility. It provides for meaningful multi-national participation while protecting U.S. interests. The concept also supports continued space operations technology development by maintaining NASA expertise and enabling technology evolution. Given attention here are pre/post flight operations, logistics, sustaining engineering/configuration management, transportation services/rescue, and information systems and communication.

  14. Long distance high power optical laser fiber break detection and continuity monitoring systems and methods

    DOEpatents

    Rinzler, Charles C.; Gray, William C.; Faircloth, Brian O.; Zediker, Mark S.

    2016-02-23

    A monitoring and detection system for use on high power laser systems, long distance high power laser systems and tools for performing high power laser operations. In particular, the monitoring and detection systems provide break detection and continuity protection for performing high power laser operations on, and in, remote and difficult to access locations.

  15. 40 CFR 63.10021 - How do I demonstrate continuous compliance with the emission limitations, operating limits, and...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... need only provide a single pre- and post-tune-up value rather than continual values before and after... quarters during which less than 168 boiler operating hours occur, except that a performance test must be conducted at least once every calendar year. (2) Must conduct the performance test as defined in Table 5 to...

  16. Extending ACTS Operations Through a University-Based Consortium

    NASA Technical Reports Server (NTRS)

    Bauer, Robert; Krawcyzk, Richard; Irwin, Dennis; Kruse, Hans

    2001-01-01

    The Advanced Communications Technology Satellite (ACTS) program was slated for decommissioning in October 2000 as was announced at the 6th Ka-band Utilization Conference in May 2000. Quite a celebration was had at that event too centering on the decommissioning of this very successful technology program. With plans in place to move the spacecraft to an orbital graveyard and then shut the system down, NASA was challenged to consider the feasibility of extending operations for education and research purposes provided that an academic organization would be willing to cover operations costs. Continuing operations of the system was determined viable and in the fall of 2000, an announcement was made by NASA to consider extending operations. Plans are now in place to continue the operations of ACTS through a university-based consortium led by Ohio University, Athens, Ohio. Initial plans are for two more years of operations, with options to extend up to a total of four years. This paper will present the change in plans to continue operations of ACTS. A description of the multi-month transition of the spacecraft to its new and final orbital location is provided. With the spacecraft at this new location, an update on its performance is presented as well as estimates of long-term performance. The consortium development will be presented along with its organization, membership, and operations plans for using ACTS.

  17. 47 CFR 90.361 - Interference from part 15 and Amateur operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... communications of entities eligible under subpart B or C of this part, or is providing the final link for communications of health care providers that serve rural areas, elementary schools, secondary schools or... operations. 90.361 Section 90.361 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND...

  18. Continuing Professional Education Delivery Systems.

    ERIC Educational Resources Information Center

    Weeks, James P.

    This investigation of delivery systems for continuing professional education provides an overview of current operational delivery systems in continuing professional education, drawing on experience as found in the literature. Learning theories and conclusions are woven into the descriptive text. Delivery systems profiled in the paper include the…

  19. Continuity of operations planning in college athletic programs: The case for incorporating Federal Emergency Management Guidelines.

    PubMed

    Hall, Stacey A; Allen, Brandon L; Phillips, Dennis

    2016-01-01

    College athletic departments have a responsibility to provide a safe environment for student-athletes; however, most colleges do not have a crisis management plan that includes procedures for displaced student-athletes or alternate facilities to perform athletic events. Continuity of operations planning ensures athletic programs are equipped to maintain essential functions during, or shortly after, a disruption of operations due to possible hazards. Previous studies have identified a lack of emergency preparedness and continuity planning in college athletic departments. The purpose of this article is to illustrate in detail one approach to disaster planning for college athletic departments, namely the Federal Emergency Management Agency (FEMA) continuity of operations framework. By adhering to FEMA guidelines and promoting a best practices model, athletic programs can effectively plan to address potential hazards, as well as protect the organization's brand, image, and financial sustainability after a crisis event.

  20. XMM-Newton mission operations - ready for its third decade

    NASA Astrophysics Data System (ADS)

    Kirsch, M.; Finn, T.; Godard, T.; v. Krusenstiern, N.; Pfeil, N.; Salt, D.; Toma, L.; Webert, D.; Weissmann, U.

    2017-10-01

    The XMM-Newton X-ray space observatory is approaching its third decade of operations. The spacecraft and payload are operating without major degradation and scientific demand is continuously very high. With the change to a new way of using the Attitude and Orbit control System in 2013 the fuel consumption was reduced by a factor of two, additionally this has reduced stress on the reaction wheels. The challenge for the next decade is now to ensure that the saved fuel is available for continuous usage. We will describe the process of the so called 'fuel migration and replenishment' activities needed to keep the spacecraft operational potentially up to 2029+. We provide as well an overall health status of the mission, the evolution of the ground segment and concepts on streamlining mission operations with continued high safety requirements using automation tools.

  1. KSC-2009-3636

    NASA Image and Video Library

    2009-06-08

    CAPE CANAVERAL, Fla. – On Launch Complex 37 at Cape Canaveral Air Force Station in Florida, preparations are complete to lift the GOES-O satellite into the mobile service tower where it will be mated with the United Launch Alliance Delta IV expendable launch vehicle. The GOES-O satellite is targeted to launch no earlier than June 26. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. Photo credit: NASA/Jack Pfaller

  2. KSC-2009-3638

    NASA Image and Video Library

    2009-06-09

    CAPE CANAVERAL, Fla. – On Launch Complex 37 at Cape Canaveral Air Force Station in Florida, the GOES-O satellite is seen in the top of the mobile service tower, where it has been mated with the United Launch Alliance Delta IV expendable launch vehicle below. The GOES-O satellite is targeted to launch June 26. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. Photo credit: NASA/Kim Shiflett

  3. KSC-2009-3633

    NASA Image and Video Library

    2009-06-08

    CAPE CANAVERAL, Fla. – On Launch Complex 37 at Cape Canaveral Air Force Station in Florida, the GOES-O satellite is being prepared for its lift into the mobile service tower where it will be mated with the United Launch Alliance Delta IV expendable launch vehicle. The GOES-O satellite is targeted to launch no earlier than June 26. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. Photo credit: NASA/Jack Pfaller

  4. KSC-2009-3639

    NASA Image and Video Library

    2009-06-09

    CAPE CANAVERAL, Fla. – On Launch Complex 37 at Cape Canaveral Air Force Station in Florida, the GOES-O satellite is seen in the top of the mobile service tower, where it has been mated with the United Launch Alliance Delta IV expendable launch vehicle below. The GOES-O satellite is targeted to launch June 26. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. Photo credit: NASA/Kim Shiflett

  5. Exploring continuous and integrated strategies for the up- and downstream processing of human mesenchymal stem cells.

    PubMed

    Cunha, Bárbara; Aguiar, Tiago; Silva, Marta M; Silva, Ricardo J S; Sousa, Marcos F Q; Pineda, Earl; Peixoto, Cristina; Carrondo, Manuel J T; Serra, Margarida; Alves, Paula M

    2015-11-10

    The integration of up- and downstream unit operations can result in the elimination of hold steps, thus decreasing the footprint, and ultimately can create robust closed system operations. This type of design is desirable for the bioprocess of human mesenchymal stem cells (hMSC), where high numbers of pure cells, at low volumes, need to be delivered for therapy applications. This study reports a proof of concept of the integration of a continuous perfusion culture in bioreactors with a tangential flow filtration (TFF) system for the concentration and washing of hMSC. Moreover, we have also explored a continuous alternative for concentrating hMSC. Results show that expanding cells in a continuous perfusion operation mode provided a higher expansion ratio, and led to a shift in cells' metabolism. TFF operated either in continuous or discontinuous allowed to concentrate cells, with high cell recovery (>80%) and viability (>95%); furthermore, continuous TFF permitted to operate longer with higher cell concentrations. Continuous diafiltration led to higher protein clearance (98%) with lower cell death, when comparing to discontinuous diafiltration. Overall, an integrated process allowed for a shorter process time, recovering 70% of viable hMSC (>95%), with no changes in terms of morphology, immunophenotype, proliferation capacity and multipotent differentiation potential. Copyright © 2015 Elsevier B.V. All rights reserved.

  6. Use of technology to support information needs for continuity of operations planning in public health: a systematic review.

    PubMed

    Reeder, Blaine; Turner, Anne; Demiris, George

    2010-01-01

    Continuity of operations planning focuses on an organization's ability to deliver essential services before, during and after an emergency. Public health leaders must make decisions based on information from many sources and their information needs are often facilitated or hindered by technology. The aim of this study is to provide a systematic review of studies of technology projects that address public health continuity of operations planning information needs and to discuss patterns, themes, and challenges to inform the design of public health continuity of operations information systems. To return a comprehensive results set in an under-explored area, we searched broadly in the Medline and EBSCOHost bibliographic databases using terms from prior work in public health emergency management and continuity of operations planning in other domains. In addition, we manually searched the citation lists of publications included for review. A total of 320 publications were reviewed. Twenty studies were identified for inclusion (twelve risk assessment decision support tools, six network and communications-enabled decision support tools, one training tool and one dedicated video-conferencing tool). Levels of implementation for information systems in the included studies range from proposed frameworks to operational systems. There is a general lack of documented efforts in the scientific literature for technology projects about public health continuity of operations planning. Available information about operational information systems suggest inclusion of public health practitioners in the design process as a factor in system success.

  7. 7 CFR 761.1 - Introduction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... objective of these programs is to provide supervised credit and management assistance to eligible farmers to become owners or operators, or both, of family farms, to continue such operations when credit is not available elsewhere, or to return to normal farming operations after sustaining substantial losses as a...

  8. 26 CFR 1.1402(a)-7 - Net operating loss deduction.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 12 2010-04-01 2010-04-01 false Net operating loss deduction. 1.1402(a)-7...) INCOME TAX (CONTINUED) INCOME TAXES Tax on Self-Employment Income § 1.1402(a)-7 Net operating loss deduction. The deduction provided by section 172, relating to net operating losses sustained in years other...

  9. 26 CFR 1.812-2 - Operations loss deduction.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (CONTINUED) INCOME TAXES Gain and Loss from Operations § 1.812-2 Operations loss deduction. (a) Allowance of deduction. Section 812 provides that a life insurance company shall be allowed a deduction in computing gain... 26 Internal Revenue 8 2010-04-01 2010-04-01 false Operations loss deduction. 1.812-2 Section 1.812...

  10. (abstract) Mission Operations and Control Assurance: Flight Operations Quality Improvements

    NASA Technical Reports Server (NTRS)

    Welz, Linda L.; Bruno, Kristin J.; Kazz, Sheri L.; Witkowski, Mona M.

    1993-01-01

    Mission Operations and Command Assurance (MO&CA), a recent addition to flight operations teams at JPL. provides a system level function to instill quality in mission operations. MO&CA's primary goal at JPL is to help improve the operational reliability for projects during flight. MO&CA tasks include early detection and correction of process design and procedural deficiencies within projects. Early detection and correction are essential during development of operational procedures and training of operational teams. MO&CA's effort focuses directly on reducing the probability of radiating incorrect commands to a spacecraft. Over the last seven years at JPL, MO&CA has become a valuable asset to JPL flight projects. JPL flight projects have benefited significantly from MO&CA's efforts to contain risk and prevent rather than rework errors. MO&CA's ability to provide direct transfer of knowledge allows new projects to benefit directly from previous and ongoing experience. Since MO&CA, like Total Quality Management (TQM), focuses on continuous improvement of processes and elimination of rework, we recommend that this effort be continued on NASA flight projects.

  11. Ring laser having an output at a single frequency

    DOEpatents

    Hackell, Lloyd A.

    1991-01-01

    A ring laser is disclosed that produces a single frequency of laser radiation in either the pulsed mode of operation or the continuous waveform (cw) mode of operation. The laser comprises a ring laser in a bowtie configuration, a birefringent gain material such as Nd:YLF, an improved optical diode that supports laser oscillation having a desired direction of travel and linear polarization, and a Q-switch. An output coupler (mirror) having a high reflectivity, such as 94%, is disclosed. Also disclosed is a self-seeded method of operation in which the laser can provide a pulse or a series of pulses of high power laser radiation at a consistent single frequency with a high degree of amplitude stability and temporal stability. In operation, the laser is operated in continuous waveform (cw) at a low power output with the Q-switch introducing a loss into the resonating cavity. Pumping is continued at a high level, causing the gain material to store energy. When a pulse is desired, the Q-switch is actuated to substantially reduce the losses so that a pulse can build up based on the low level cw oscillation. The pulse quickly builds, using the stored energy in the gain medium to provide a high power output pulse. The process may be repeated to provide a series of high power pulses of a consistent single frequency.

  12. Project Developmental Continuity: Field Procedures Manual.

    ERIC Educational Resources Information Center

    Morris, Mary

    This operations manual for field staff (site monitors, site coordinators, and testers) involved in the observation and testing of children is part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's…

  13. 26 CFR 1.826-1 - Election by reciprocal underwriters and interinsurers.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES (CONTINUED) Mutual Insurance Companies (other Than Life and Certain Marine Insurance Companies and Other Than Fire Or Flood Insurance Companies Which Operate on Basis... interinsurers. (a) In general. Except as otherwise provided in section 826(c), any mutual insurance company...

  14. 26 CFR 1.826-1 - Election by reciprocal underwriters and interinsurers.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES (CONTINUED) Mutual Insurance Companies (other Than Life and Certain Marine Insurance Companies and Other Than Fire Or Flood Insurance Companies Which Operate on Basis... interinsurers. (a) In general. Except as otherwise provided in section 826(c), any mutual insurance company...

  15. 26 CFR 1.826-1 - Election by reciprocal underwriters and interinsurers.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES (CONTINUED) Mutual Insurance Companies (other Than Life and Certain Marine Insurance Companies and Other Than Fire Or Flood Insurance Companies Which Operate on Basis... interinsurers. (a) In general. Except as otherwise provided in section 826(c), any mutual insurance company...

  16. 26 CFR 1.826-1 - Election by reciprocal underwriters and interinsurers.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES (CONTINUED) Mutual Insurance Companies (other Than Life and Certain Marine Insurance Companies and Other Than Fire Or Flood Insurance Companies Which Operate on Basis... interinsurers. (a) In general. Except as otherwise provided in section 826(c), any mutual insurance company...

  17. The Power of Continuity in Graduate Teacher Education Master's Programmes

    ERIC Educational Resources Information Center

    Molseed, Timothy R.

    2009-01-01

    The intentional development of continuity as it applies to programme structure, themes and outcomes is examined for their power in providing a coherent circular connection between the philosophy, operation, assessment and outcomes of a graduate teacher education programme. It is argued that the intentional development of programme continuity will…

  18. 47 CFR 64.710 - Operator services for prison inmate phones.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Operator services for prison inmate phones. 64.710 Section 64.710 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER... services for prison inmate phones. (a) Each provider of inmate operator services shall: (1) Identify itself...

  19. 40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... may come from plans you developed for other purposes such as a Standard Operating Procedure manual or... source is operational. The SSM plan provides detailed procedures for operating and maintaining your...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  20. 40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... may come from plans you developed for other purposes such as a Standard Operating Procedure manual or... source is operational. The SSM plan provides detailed procedures for operating and maintaining your...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  1. Water Treatment Technology - General Plant Operation.

    ERIC Educational Resources Information Center

    Ross-Harrington, Melinda; Kincaid, G. David

    One of twelve water treatment technology units, this student manual on general plant operations provides instructional materials for seven competencies. (The twelve units are designed for a continuing education training course for public water supply operators.) The competencies focus on the following areas: water supply regulations, water plant…

  2. 40 CFR 792.49 - Laboratory operation areas.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 32 2011-07-01 2011-07-01 false Laboratory operation areas. 792.49... CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Facilities § 792.49 Laboratory operation areas. Separate laboratory space and other space shall be provided, as needed, for the performance of the routine...

  3. An evaluation of grease type ball bearing lubricants operating in various environments

    NASA Technical Reports Server (NTRS)

    Mcmurtrey, E. L.

    1981-01-01

    Because many future spacecraft or space stations will require mechanisms to operate for long periods of time in environments which are adverse to most bearing lubricants, a series of tests is continuing to evaluate 38 grease type lubricants in R-4 size bearings in five different environments for a 1 year period. Four repetitions of each test are made to provide statistical samples. These tests were used to select four lubricants for 5 year tests in selected environments with five repetitions of each test for statistical samples. At the present time, 100 test sets are completed and 22 test sets are underway. Three 5 year tests were started in (1) continuous operation and (2) start-stop operation, with both in vacuum at ambient temperatures, and (3) continuous operation at 93.3 C. In the 1 year tests the best results to date in all environments were obtained with a high viscosity index perfluoroalkylpolyether (PFPE) grease.

  4. Continuous cryopump with a device for regenerating the cryosurface

    DOEpatents

    Foster, C.A.

    1988-02-16

    A high throughput continuous cryopump is provided. The cryopump incorporates an improved method for regenerating the cryopumping surface while the pump is in continuous operation. The regeneration of the cryopumping surface does not thermally cycle the pump, and to this end a small chamber connected to a secondary pumping source serves to contain and exhaust frost removed from the cryopumping surface during such regeneration. The frost is exhausted at a rate substantially independent of the speed of the cryopump which enhances the capability of the pump to achieve a high compression ratio and allow the pump to operate continuously while the cryopumping surface is being regenerated. 8 figs.

  5. Planning and conducting medical support to joint operations.

    PubMed

    Hughes, A S

    2000-01-01

    Operations are core business for all of us and the PJHQ medical cell is at the heart of this process. With the likelihood of a continuing UK presence in the Balkans for some time to come, the challenge of meeting this and any other new operational commitments will continue to demand a flexible and innovative approach from all concerned. These challenges together with the Joint and multinational aspects of the job make the PJHQ medical cell a demanding but rewarding place to work and provide a valuable Joint staff training opportunity for the RNMS.

  6. Design and dynamic simulation of a fixed pitch 56 kW wind turbine drive train with a continuously variable transmission

    NASA Technical Reports Server (NTRS)

    Gallo, C.; Kasuba, R.; Pintz, A.; Spring, J.

    1986-01-01

    The dynamic analysis of a horizontal axis fixed pitch wind turbine generator (WTG) rated at 56 kW is discussed. A mechanical Continuously Variable Transmission (CVT) was incorporated in the drive train to provide variable speed operation capability. One goal of the dynamic analysis was to determine if variable speed operation, by means of a mechanical CVT, is capable of capturing the transient power in the WTG/wind environment. Another goal was to determine the extent of power regulation possible with CVT operation.

  7. Operation of GRETINA at NSCL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sherrill, Bradley; Gade, Alexandra

    This proposal funded the continued operation of the Gamma-ray Energy tracking Array GRETINA as a user device at the National Superconducting Cyclotron Laboratory (NSCL) at Michigan State University. This was a continuation and covered the operation from January 1, 2017 to December 31, 2017. Twenty-three experiments were completed with GRETINA at NSCL. GRETINA was installed at the reaction target position of the high-resolution, large-acceptance S800 spectrograph and the program started on October 15, 2017. The campaign capitalized on the opportunities provided by NSCL’s energetic rare isotope beams produced by projectile fragmentation.

  8. KSC-2009-2584

    NASA Image and Video Library

    2009-03-22

    CAPE CANAVERAL, Fla. – In the Astrotech payload processing facility in Titusville, Fla., technicians monitor the alignment of the GOES-O satellite onto a special stand for loading of its oxidizer and hydrazine propellants. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. The GOES-O satellite is targeted to launch from Cape Canaveral Air Force Station's Launch Complex 37 no earlier than May 12 onboard a United Launch Alliance Delta IV expendable launch vehicle. Photo credit: NASA/Troy Cryder

  9. KSC-2009-2585

    NASA Image and Video Library

    2009-03-22

    CAPE CANAVERAL, Fla. – In the Astrotech payload processing facility in Titusville, Fla., technicians check the alignment of the GOES-O satellite onto a special stand for loading of its oxidizer and hydrazine propellants. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. The GOES-O satellite is targeted to launch from Cape Canaveral Air Force Station's Launch Complex 37 no earlier than May 12 onboard a United Launch Alliance Delta IV expendable launch vehicle. Photo credit: NASA/Troy Cryder

  10. Long Term, Operational Monitoring Of Enhanced Oil Recovery In Harsh Environments With INSAR

    NASA Astrophysics Data System (ADS)

    Sato, S.; Henschel, M. D.

    2012-01-01

    Since 2004, MDA GSI has provided ground deformation measurements for an oil field in northern Alberta, Canada using InSAR technology. During this period, the monitoring has reliably shown the slow rise of the oil field due to enhanced oil recovery operations. The InSAR monitoring solution is essentially based on the observation of point and point-like targets in the field. Ground conditions in the area are almost continuously changing (in their reflectivity characteristics) making it difficult to ob- serve coherent patterns from the ground. The extended duration of the oil operations has allowed us to continue InSAR monitoring and transition from RADARSAT-1 to RADARSAT-2. With RADARSAT-2 and the enhancement of the satellite resolution capability has provided more targets of opportunity as identified by a differential coherence method. This poster provides an overview of the long term monitoring of the oil field in northern Alberta, Canada.

  11. KSC-2009-2587

    NASA Image and Video Library

    2009-03-22

    CAPE CANAVERAL, Fla. – In the Astrotech payload processing facility in Titusville, Fla., technicians secure the GOES-O satellite onto a special stand for loading of its oxidizer and hydrazine propellants. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. The GOES-O satellite is targeted to launch from Cape Canaveral Air Force Station's Launch Complex 37 no earlier than May 12 onboard a United Launch Alliance Delta IV expendable launch vehicle. Photo credit: NASA/Troy Cryder

  12. KSC-2009-2577

    NASA Image and Video Library

    2009-03-22

    CAPE CANAVERAL, Fla. – In the Astrotech payload processing facility in Titusville, Fla., technicians lift the GOES-O satellite to move it to a special stand for loading of its oxidizer and hydrazine propellants. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. The GOES-O satellite is targeted to launch from Cape Canaveral Air Force Station's Launch Complex 37 no earlier than May 12 onboard a United Launch Alliance Delta IV expendable launch vehicle. Photo credit: NASA/Troy Cryder

  13. KSC-2009-2581

    NASA Image and Video Library

    2009-03-22

    CAPE CANAVERAL, Fla. – In the Astrotech payload processing facility in Titusville, Fla., the GOES-O satellite traverses the clean room toward a special stand for loading of its oxidizer and hydrazine propellants. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. The GOES-O satellite is targeted to launch from Cape Canaveral Air Force Station's Launch Complex 37 no earlier than May 12 onboard a United Launch Alliance Delta IV expendable launch vehicle. Photo credit: NASA/Troy Cryder

  14. KSC-2009-2580

    NASA Image and Video Library

    2009-03-22

    CAPE CANAVERAL, Fla. – In the Astrotech payload processing facility in Titusville, Fla., the GOES-O satellite is moved toward a special stand for loading of its oxidizer and hydrazine propellants. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. The GOES-O satellite is targeted to launch from Cape Canaveral Air Force Station's Launch Complex 37 no earlier than May 12 onboard a United Launch Alliance Delta IV expendable launch vehicle. Photo credit: NASA/Troy Cryder

  15. KSC-2009-2582

    NASA Image and Video Library

    2009-03-22

    CAPE CANAVERAL, Fla. – In the Astrotech payload processing facility in Titusville, Fla., the GOES-O satellite is gently moved toward a special stand for loading of its oxidizer and hydrazine propellants. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. The GOES-O satellite is targeted to launch from Cape Canaveral Air Force Station's Launch Complex 37 no earlier than May 12 onboard a United Launch Alliance Delta IV expendable launch vehicle. Photo credit: NASA/Troy Cryder

  16. KSC-2009-2583

    NASA Image and Video Library

    2009-03-22

    CAPE CANAVERAL, Fla. – In the Astrotech payload processing facility in Titusville, Fla., the GOES-O satellite is gently lowered onto a special stand for loading of its oxidizer and hydrazine propellants. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. The GOES-O satellite is targeted to launch from Cape Canaveral Air Force Station's Launch Complex 37 no earlier than May 12 onboard a United Launch Alliance Delta IV expendable launch vehicle. Photo credit: NASA/Troy Cryder

  17. KSC-2009-2588

    NASA Image and Video Library

    2009-03-22

    CAPE CANAVERAL, Fla. – In the Astrotech payload processing facility in Titusville, Fla., technicians secure the GOES-O satellite onto a special stand for loading of its oxidizer and hydrazine propellants. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. The GOES-O satellite is targeted to launch from Cape Canaveral Air Force Station's Launch Complex 37 no earlier than May 12 onboard a United Launch Alliance Delta IV expendable launch vehicle. Photo credit: NASA/Troy Cryder

  18. KSC-2009-2576

    NASA Image and Video Library

    2009-03-22

    CAPE CANAVERAL, Fla. – In the Astrotech payload processing facility in Titusville, Fla., technicians prepare to move the GOES-O satellite onto a special stand for loading of its oxidizer and hydrazine propellants. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. The GOES-O satellite is targeted to launch from Cape Canaveral Air Force Station's Launch Complex 37 no earlier than May 12 onboard a United Launch Alliance Delta IV expendable launch vehicle. Photo credit: NASA/Troy Cryder

  19. KSC-2009-2578

    NASA Image and Video Library

    2009-03-22

    CAPE CANAVERAL, Fla. – In the Astrotech payload processing facility in Titusville, Fla., technicians move the GOES-O satellite toward a special stand for loading of its oxidizer and hydrazine propellants. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. The GOES-O satellite is targeted to launch from Cape Canaveral Air Force Station's Launch Complex 37 no earlier than May 12 onboard a United Launch Alliance Delta IV expendable launch vehicle. Photo credit: NASA/Troy Cryder

  20. KSC-2009-2579

    NASA Image and Video Library

    2009-03-22

    CAPE CANAVERAL, Fla. – In the Astrotech payload processing facility in Titusville, Fla., technicians monitor the lift of the GOES-O satellite toward a special stand for loading of its oxidizer and hydrazine propellants. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. The GOES-O satellite is targeted to launch from Cape Canaveral Air Force Station's Launch Complex 37 no earlier than May 12 onboard a United Launch Alliance Delta IV expendable launch vehicle. Photo credit: NASA/Troy Cryder

  1. KSC-2009-3634

    NASA Image and Video Library

    2009-06-08

    CAPE CANAVERAL, Fla. – On Launch Complex 37 at Cape Canaveral Air Force Station in Florida, the GOES-O satellite is fitted with a sling to lift it into the mobile service tower where it will be mated with the United Launch Alliance Delta IV expendable launch vehicle. The GOES-O satellite is targeted to launch no earlier than June 26. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. Photo credit: NASA/Jack Pfaller

  2. KSC-2009-3556

    NASA Image and Video Library

    2009-06-05

    CAPE CANAVERAL, Fla. – At the Astrotech payload processing facility in Titusville, Fla., workers prepare to move the platform on which the encapsulated GOES-O satellite sits in preparation for moving GOES-O to Cape Canaveral Air Force Station's Launch Complex 37 pad where it will be mated with the United Launch Alliance Delta IV expendable launch vehicle. The GOES-O satellite is targeted to launch no earlier than June 26. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. Photo credit: NASA/Jack Pfaller

  3. KSC-2009-3557

    NASA Image and Video Library

    2009-06-05

    CAPE CANAVERAL, Fla. – At the Astrotech payload processing facility in Titusville, Fla., workers move the platform on which the encapsulated GOES-O satellite sits in preparation for moving GOES-O to Cape Canaveral Air Force Station's Launch Complex 37 pad where it will be mated with the United Launch Alliance Delta IV expendable launch vehicle. The GOES-O satellite is targeted to launch no earlier than June 26. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. Photo credit: NASA/Jack Pfaller

  4. KSC-2009-3554

    NASA Image and Video Library

    2009-06-05

    CAPE CANAVERAL, Fla. – At the Astrotech payload processing facility in Titusville, Fla., access platforms are being removed from around the encapsulated GOES-O satellite in preparation for moving GOES-O to Cape Canaveral Air Force Station's Launch Complex 37 pad where it will be mated with the United Launch Alliance Delta IV expendable launch vehicle. The GOES-O satellite is targeted to launch no earlier than June 26. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. Photo credit: NASA/Jack Pfaller

  5. KSC-2009-3555

    NASA Image and Video Library

    2009-06-05

    CAPE CANAVERAL, Fla. – At the Astrotech payload processing facility in Titusville, Fla., access platforms are being removed from around the encapsulated GOES-O satellite in preparation for moving GOES-O to Cape Canaveral Air Force Station's Launch Complex 37 pad where it will be mated with the United Launch Alliance Delta IV expendable launch vehicle. The GOES-O satellite is targeted to launch no earlier than June 26. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. Photo credit: NASA/Jack Pfaller

  6. KSC-2009-3635

    NASA Image and Video Library

    2009-06-08

    CAPE CANAVERAL, Fla. – On Launch Complex 37 at Cape Canaveral Air Force Station in Florida, workers finish attaching the sling on the GOES-O satellite that will to lift it into the mobile service tower where it will be mated with the United Launch Alliance Delta IV expendable launch vehicle. The GOES-O satellite is targeted to launch no earlier than June 26. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. Photo credit: NASA/Jack Pfaller

  7. KSC-2009-3558

    NASA Image and Video Library

    2009-06-05

    CAPE CANAVERAL, Fla. – At the Astrotech payload processing facility in Titusville, Fla., workers move the platform on which the encapsulated GOES-O satellite sits in preparation for moving GOES-O to Cape Canaveral Air Force Station's Launch Complex 37 pad where it will be mated with the United Launch Alliance Delta IV expendable launch vehicle. The GOES-O satellite is targeted to launch no earlier than June 26. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. Photo credit: NASA/Jack Pfaller

  8. KSC-2009-3857

    NASA Image and Video Library

    2009-06-27

    CAPE CANAVERAL, Fla. – A Delta IV rocket soars into the sky with the GOES-O satellite aboard despite the attempts of Florida's typical seasonal weather to thwart the launch. Liftoff was at 6:51 p.m. EDT from Launch Complex 37 at Cape Canaveral Air Force Station in Florida. The first attempt to launch GOES-O, on June 26, was scrubbed due to thunderstorms in the vicinity of Cape Canaveral. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. Each of the GOES satellites continuously provides observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. Photo credit: NASA/Jack Pfaller

  9. Ambient-temperature co-oxidation catalysts

    NASA Technical Reports Server (NTRS)

    Upchurch, Billy T.; Schryer, David R.; Brown, Kenneth G.; Kielin, Erik J.

    1991-01-01

    Oxidation catalysts which operate at ambient temperature were developed for the recombination of carbon monoxide (CO) and oxygen (O2) dissociation products which are formed during carbon dioxide (CO2) laser operation. Recombination of these products to regenerate CO2 allows continuous operation of CO2 lasers in a closed cycle mode. Development of these catalyst materials provides enabling technology for the operation of such lasers from space platforms or in ground based facilities without constant gas consumption required for continuous open cycle operation. Such catalysts also have other applications in various areas outside the laser community for removal of CO from other closed environments such as indoor air and as an ambient temperature catalytic converter for control of auto emissions.

  10. Hydrogen Infrastructure Testing and Research Facility Video (Text Version)

    Science.gov Websites

    grid integration, continuous code improvement, fuel cell vehicle operation, and renewable hydrogen stations. NRELs research on hydrogen safety provides guidance for safe operation, handling, and use of standards and testing fuel cell and hydrogen components for operation and safety. Building on NRELs Wind-to

  11. 40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the procedures may come from plans you developed for other purposes such as a Standard Operating... as long as the source is operational. The SSM plan provides detailed procedures for operating and...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  12. 40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the procedures may come from plans you developed for other purposes such as a Standard Operating... as long as the source is operational. The SSM plan provides detailed procedures for operating and...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  13. 40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the procedures may come from plans you developed for other purposes such as a Standard Operating... as long as the source is operational. The SSM plan provides detailed procedures for operating and...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  14. 14 CFR 171.271 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... generated. Adequate power capacity must be provided for the operation of test and working equipment of the... restoration of power, the batteries must be restored to full charge within 24 hours. When primary power is... battery must permit continuation of normal operation for at least two hours under the normal operating...

  15. 77 FR 36393 - Drawbridge Operation Regulation; Sacramento River, Isleton, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... maintenance on the drawbridge. This deviation allows single leaf operation of the double leaf bascule style... required by 33 CFR 117.189(a). Navigation on the waterway is commercial and recreational. Either leaf of.... The opposite leaf will continue to operate normally, providing unlimited vertical clearance and 83...

  16. High Temporal Resolution Tropospheric Wind Profile Observations at NASA Kennedy Space Center during Hurricane Irma

    NASA Technical Reports Server (NTRS)

    Decker, Ryan K.; Barbre, Robert E., Jr.; Huddleston, Lisa; Brauer, Thomas; Wilfong, Timothy

    2018-01-01

    The National Aeronautics and Space Administration's (NASA) Kennedy Space Center (KSC) operates a 48-MHz Tropospheric/Stratospheric Doppler Radar Wind Profiler (TDRWP) on a continual basis generating wind profiles between 2-19 km (approximately 6.6-62.3 kft) in the support of space launch vehicle operations. A benefit of the continual operability of the system is the ability to provide unique observations of severe weather events such as hurricanes. On the evening of 10 September 2017, Hurricane Irma passed within 160 km (87 nmi) to the west of KSC through the middle of the Florida peninsula. The hurricane was responsible for power outages to approximately 2/3 of Florida's population (Stein, 2017). This paper will provide an overview of the TDRWP system, describe the characteristics of the wind observations from the TDRWP during Irma passage, provide a comparison to previous TDRWP observations from Hurricane Matthew in 2016, and provide the location where TDRWP data is available to the meteorological community.

  17. An evaluation of grease type ball bearing lubricants operating in various environments

    NASA Technical Reports Server (NTRS)

    Mcmurtrey, E. L.

    1979-01-01

    Grease type lubricants in bearings were evaluated in five different adverse environments for a one year period. Four repetitions of each test were made to provide statistical samples. These tests were then used to select four lubricants for five year tests in selected environments with five repetitions of each test for statistical samples. Three five year tests were started in (1) continuous operation; (2) start-stop operation, with both in vacuum at ambient temperatures; and (3) continuous operation at 93.3 C. To date, in the one year tests, the best results in all environments were obtained with a high viscosity index perfluoroalkylpolyether grease.

  18. Continuous beer fermentation using immobilized yeast cell bioreactor systems.

    PubMed

    Brányik, Tomás; Vicente, António A; Dostálek, Pavel; Teixeira, José A

    2005-01-01

    Traditional beer fermentation and maturation processes use open fermentation and lager tanks. Although these vessels had previously been considered indispensable, during the past decades they were in many breweries replaced by large production units (cylindroconical tanks). These have proved to be successful, both providing operating advantages and ensuring the quality of the final beer. Another promising contemporary technology, namely, continuous beer fermentation using immobilized brewing yeast, by contrast, has found only a limited number of industrial applications. Continuous fermentation systems based on immobilized cell technology, albeit initially successful, were condemned to failure for several reasons. These include engineering problems (excess biomass and problems with CO(2) removal, optimization of operating conditions, clogging and channeling of the reactor), unbalanced beer flavor (altered cell physiology, cell aging), and unrealized cost advantages (carrier price, complex and unstable operation). However, recent development in reactor design and understanding of immobilized cell physiology, together with application of novel carrier materials, could provide a new stimulus to both research and application of this promising technology.

  19. 26 CFR 1.823-8 - Special transitional underwriting loss; cross reference.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES (CONTINUED) Mutual Insurance Companies (other Than Life and Certain Marine Insurance Companies and Other Than Fire Or Flood Insurance Companies Which Operate on Basis..., section 821(f) provides, for any company subject to the tax imposed by section 821(a), a special reduction...

  20. 26 CFR 1.823-8 - Special transitional underwriting loss; cross reference.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES (CONTINUED) Mutual Insurance Companies (other Than Life and Certain Marine Insurance Companies and Other Than Fire Or Flood Insurance Companies Which Operate on Basis..., section 821(f) provides, for any company subject to the tax imposed by section 821(a), a special reduction...

  1. 26 CFR 1.823-8 - Special transitional underwriting loss; cross reference.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES (CONTINUED) Mutual Insurance Companies (other Than Life and Certain Marine Insurance Companies and Other Than Fire Or Flood Insurance Companies Which Operate on Basis..., section 821(f) provides, for any company subject to the tax imposed by section 821(a), a special reduction...

  2. 26 CFR 1.823-8 - Special transitional underwriting loss; cross reference.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES (CONTINUED) Mutual Insurance Companies (other Than Life and Certain Marine Insurance Companies and Other Than Fire Or Flood Insurance Companies Which Operate on Basis..., section 821(f) provides, for any company subject to the tax imposed by section 821(a), a special reduction...

  3. 5 CFR 831.202 - Continuation of coverage for food service employees of the House of Representatives.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... employees of the House of Representatives. 831.202 Section 831.202 Administrative Personnel OFFICE OF... Continuation of coverage for food service employees of the House of Representatives. (a) Congressional employees who provide food service operations for the House of Representatives can elect to continue their...

  4. Mission Continuity Planning: Strategically Assessing and Planning for Threats to Operations.

    ERIC Educational Resources Information Center

    Qayoumi, Mohammad H.

    This book covers the principles of risk and risk management and offers a framework for analyzing the significant, often unforeseen threats facing higher education institutions today. It examines the critical elements of a disaster preparedness plan and addresses business continuity and mission continuity planning. The book also provides tools for…

  5. Centrifuge apparatus

    DOEpatents

    Sartory, Walter K.; Eveleigh, John W.

    1976-01-01

    A method and apparatus for operating a continuous flow blood separation centrifuge are provided. The hematocrit of the entrant whole blood is continuously maintained at an optimum constant value by the addition of plasma to the entrant blood. The hematocrit of the separated red cells is monitored to indicate the degree of separation taking place, thereby providing a basis for regulating the flow through the centrifuge.

  6. Glenn's Telescience Support Center Provided Around-the-Clock Operations Support for Space Experiments on the International Space Station

    NASA Technical Reports Server (NTRS)

    Malarik, Diane C.

    2005-01-01

    NASA Glenn Research Center s Telescience Support Center (TSC) allows researchers on Earth to operate experiments onboard the International Space Station (ISS) and the space shuttles. NASA s continuing investment in the required software, systems, and networks provides distributed ISS ground operations that enable payload developers and scientists to monitor and control their experiments from the Glenn TSC. The quality of scientific and engineering data is enhanced while the long-term operational costs of experiments are reduced because principal investigators and engineering teams can operate their payloads from their home institutions.

  7. 42 CFR 3.102 - Process and requirements for initial and continued listing of PSOs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information that is not available to other providers, or affect the independence of PSO operations, management... to information regarding the work and operation of the PSO that is not available to other contracting...

  8. 40 CFR 63.1655 - Maintenance requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operator may use the affected source's standard operating procedures (SOP) manual or other plan, provided... (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants for Ferroalloys Production: Ferromanganese and Silicomanganese § 63...

  9. 40 CFR 63.1655 - Maintenance requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operator may use the affected source's standard operating procedures (SOP) manual or other plan, provided... (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants for Ferroalloys Production: Ferromanganese and Silicomanganese § 63...

  10. 40 CFR 68.90 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Emergency Response § 68.90 Applicability. (a) Except as provided in... processes shall comply with the requirements of § 68.95. (b) The owner or operator of stationary source...

  11. 40 CFR 265.340 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES... hazardous waste incinerators (as defined in § 260.10 of this chapter), except as § 265.1 provides otherwise...

  12. 40 CFR 265.340 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES... hazardous waste incinerators (as defined in § 260.10 of this chapter), except as § 265.1 provides otherwise...

  13. 40 CFR 264.220 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Surface Impoundments... that use surface impoundments to treat, store, or dispose of hazardous waste except as § 264.1 provides...

  14. 40 CFR 264.270 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Land Treatment § 264... treat or dispose of hazardous waste in land treatment units, except as § 264.1 provides otherwise. ...

  15. 40 CFR 264.270 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Land Treatment § 264... treat or dispose of hazardous waste in land treatment units, except as § 264.1 provides otherwise. ...

  16. 40 CFR 264.270 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Land Treatment § 264... treat or dispose of hazardous waste in land treatment units, except as § 264.1 provides otherwise. ...

  17. 40 CFR 264.270 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Land Treatment § 264... treat or dispose of hazardous waste in land treatment units, except as § 264.1 provides otherwise. ...

  18. 40 CFR 264.270 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Land Treatment § 264... treat or dispose of hazardous waste in land treatment units, except as § 264.1 provides otherwise. ...

  19. Continuous enzymatic hydrolysis of lignocellulosic biomass in a membrane-reactor system: Continuous enzymatic hydrolysis of lignocellulosic biomass in a membrane-reactor system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stickel, Jonathan J.; Adhikari, Birendra; Sievers, David A.

    Converting abundant lignocellulosic biomass to sugars as fungible precursors to fuels and chemicals has the potential to diversify the supply chain for those products, but further process improvements are needed to achieve economic viability. In the current work, process intensification of the key enzymatic hydrolysis unit operation is demonstrated by means of a membrane reactor system that was operated continuously. Lignocellulosic biomass (pretreated corn stover) and buffered enzyme solution were fed to a continuously stirred-tank reactor, and clarified sugar solution was withdrawn via a commercial tubular ultrafiltration membrane. The membrane permeance decline and membrane cleaning efficacy were studied and didmore » not vary significantly when increasing fraction insoluble solids (FIS) from 2.5% to 5%. Continuous enzymatic hydrolysis was successfully operated for more than 80 h. A model for the reactor system was able to predict dynamic behavior that was in reasonable agreement with experimental results. The modeled technical performance of anticipated commercial batch and continuous enzymatic hydrolysis processes were compared and showed that continuous operation would provide at least twice the volumetric productivity for the conditions studied. Further improvements are anticipated by better membrane selection and by increasing FIS.« less

  20. Continuous enzymatic hydrolysis of lignocellulosic biomass in a membrane-reactor system: Continuous enzymatic hydrolysis of lignocellulosic biomass in a membrane-reactor system

    DOE PAGES

    Stickel, Jonathan J.; Adhikari, Birendra; Sievers, David A.; ...

    2018-02-21

    Converting abundant lignocellulosic biomass to sugars as fungible precursors to fuels and chemicals has the potential to diversify the supply chain for those products, but further process improvements are needed to achieve economic viability. In the current work, process intensification of the key enzymatic hydrolysis unit operation is demonstrated by means of a membrane reactor system that was operated continuously. Lignocellulosic biomass (pretreated corn stover) and buffered enzyme solution were fed to a continuously stirred-tank reactor, and clarified sugar solution was withdrawn via a commercial tubular ultrafiltration membrane. The membrane permeance decline and membrane cleaning efficacy were studied and didmore » not vary significantly when increasing fraction insoluble solids (FIS) from 2.5% to 5%. Continuous enzymatic hydrolysis was successfully operated for more than 80 h. A model for the reactor system was able to predict dynamic behavior that was in reasonable agreement with experimental results. The modeled technical performance of anticipated commercial batch and continuous enzymatic hydrolysis processes were compared and showed that continuous operation would provide at least twice the volumetric productivity for the conditions studied. Further improvements are anticipated by better membrane selection and by increasing FIS.« less

  1. LANL Multiyear Strategy Performance Improvement (MYSPI), Fiscal Years 2017–2021

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leasure, Craig Scott

    2016-05-03

    Los Alamos National Laboratory (LANL) protects the nation and the world using innovative science, technology, and engineering through an integrated approach that harnesses the strength of our people, capabilities, and operations. The Laboratory’s Strategic Plan and Purpose statement provide the framework for scientific excellence and operational excellence now and in the future. Our Strategic Plan and Purpose help position Los Alamos for continuing mission success that ensures the safety, security, and effectiveness of the nation’s deterrent; protects the nation from nuclear and emerging threats through our larger global security missions; provides energy security to the nation; and ensures that themore » nation’s scientific reputation and capabilities remain robust enough to assure our allies and deter our adversaries. Moreover, we use these principles and guidance to ensure that Los Alamos is successful in attracting, recruiting, and retaining the next generation of world-class talent, while creating an efficient, environmentally responsible workplace that provides our employees with access to modern scientific tools and resources. Using this guidance and its underlying principles, we are continuing to restore credibility and operational effectiveness to the Laboratory, deliver mission success and continuing scientific excellence, and protect our employees and the nation’s secrets.« less

  2. LANL Multiyear Strategy Performance Improvement (MYSPI), Fiscal Years 2018-2022

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leasure, Craig Scott

    Los Alamos National Laboratory (LANL) protects the nation and the world using innovative science, technology, and engineering through an integrated approach that harnesses the strength of our people, capabilities, and operations. The Laboratory’s Strategic Plan and Purpose statement provide the framework for scientific excellence and operational excellence now and in the future. Our Strategic Plan and Purpose help position Los Alamos for continuing mission success that ensures the safety, security, and effectiveness of the nation’s deterrent; protects the nation from nuclear and emerging threats through our larger global security missions; provides energy security to the nation; and ensures that themore » nation’s scientific reputation and capabilities remain robust enough to assure our allies and deter our adversaries. Moreover, we use these principles and guidance to ensure that Los Alamos is successful in attracting, recruiting, and retaining the next generation of excellent talent, while creating an efficient, environmentally responsible workplace that provides our employees with access to modern scientific tools and resources. Using this guidance and its underlying principles, we are continuing to restore credibility and operational effectiveness to the Laboratory, deliver mission success and continuing scientific excellence, and protect our employees and the nation’s secrets.« less

  3. 29 CFR 780.506 - Dependence of exemption on shade-grown tobacco operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Dependence of exemption on shade-grown tobacco operations. 780.506 Section 780.506 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION....506 Dependence of exemption on shade-grown tobacco operations. The exemption provided by section 13(a...

  4. 43 CFR 3483.1 - Diligent development and continued operation requirement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., each Federal coal lease and LMU is required to achieve diligent development. (2) Once the operator/lessee of a Federal coal lease or LMU has achieved diligent development, the operator/lessee shall..., except as provided in § 3483.3 of this title. (b) Federal coal leases issued prior to August 4, 1976...

  5. 43 CFR 3483.1 - Diligent development and continued operation requirement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., each Federal coal lease and LMU is required to achieve diligent development. (2) Once the operator/lessee of a Federal coal lease or LMU has achieved diligent development, the operator/lessee shall..., except as provided in § 3483.3 of this title. (b) Federal coal leases issued prior to August 4, 1976...

  6. 43 CFR 3483.1 - Diligent development and continued operation requirement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., each Federal coal lease and LMU is required to achieve diligent development. (2) Once the operator/lessee of a Federal coal lease or LMU has achieved diligent development, the operator/lessee shall..., except as provided in § 3483.3 of this title. (b) Federal coal leases issued prior to August 4, 1976...

  7. 43 CFR 3483.1 - Diligent development and continued operation requirement.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., each Federal coal lease and LMU is required to achieve diligent development. (2) Once the operator/lessee of a Federal coal lease or LMU has achieved diligent development, the operator/lessee shall..., except as provided in § 3483.3 of this title. (b) Federal coal leases issued prior to August 4, 1976...

  8. 46 CFR 117.207 - Survival craft-vessels operating on lakes, bays, and sounds routes.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... sounds routes. 117.207 Section 117.207 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED... Survival craft—vessels operating on lakes, bays, and sounds routes. (a) Each vessel with overnight accommodations certificated to operate on a lakes, bays, and sounds route must be provided with inflatable...

  9. 46 CFR 117.207 - Survival craft-vessels operating on lakes, bays, and sounds routes.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... sounds routes. 117.207 Section 117.207 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED... Survival craft—vessels operating on lakes, bays, and sounds routes. (a) Each vessel with overnight accommodations certificated to operate on a lakes, bays, and sounds route must be provided with inflatable...

  10. 46 CFR 117.207 - Survival craft-vessels operating on lakes, bays, and sounds routes.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... sounds routes. 117.207 Section 117.207 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED... Survival craft—vessels operating on lakes, bays, and sounds routes. (a) Each vessel with overnight accommodations certificated to operate on a lakes, bays, and sounds route must be provided with inflatable...

  11. 46 CFR 117.207 - Survival craft-vessels operating on lakes, bays, and sounds routes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... sounds routes. 117.207 Section 117.207 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED... Survival craft—vessels operating on lakes, bays, and sounds routes. (a) Each vessel with overnight accommodations certificated to operate on a lakes, bays, and sounds route must be provided with inflatable...

  12. Continuous-variable measurement-device-independent quantum key distribution with photon subtraction

    NASA Astrophysics Data System (ADS)

    Ma, Hong-Xin; Huang, Peng; Bai, Dong-Yun; Wang, Shi-Yu; Bao, Wan-Su; Zeng, Gui-Hua

    2018-04-01

    It has been found that non-Gaussian operations can be applied to increase and distill entanglement between Gaussian entangled states. We show the successful use of the non-Gaussian operation, in particular, photon subtraction operation, on the continuous-variable measurement-device-independent quantum key distribution (CV-MDI-QKD) protocol. The proposed method can be implemented based on existing technologies. Security analysis shows that the photon subtraction operation can remarkably increase the maximal transmission distance of the CV-MDI-QKD protocol, which precisely make up for the shortcoming of the original CV-MDI-QKD protocol, and one-photon subtraction operation has the best performance. Moreover, the proposed protocol provides a feasible method for the experimental implementation of the CV-MDI-QKD protocol.

  13. Continuous cryopump with a device for regenerating the cryosurface

    DOEpatents

    Foster, Christopher A.

    1988-01-01

    A high throughput continuous cryopump is provided. The cryopump (10) incorporates an improved method for regenerating the cryopumping surface (22) while the pump is in continuous operation. The regeneration of the cryopumping surface (22) does not thermally cycle the pump, and to this end a small chamber (91) connected to a secondary pumping source (60) serves to contain and exhaust frost removed from the cryopumping surface (22) during such regeneration. The frost is exhausted at a rate substantially independent of the speed of the cryopump which enhances the capability of the pump to achieve a high compression ratio and allow the pump to operate continuously while the cryopumping surface is being regenerated.

  14. Continuous wave operation of quantum cascade lasers with frequency-shifted feedback

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lyakh, A., E-mail: arkadiy.lyakh@ucf.edu; NanoScience Technology Center, University of Central Florida, 12424 Research Pkwy, Orlando, FL 32826; College of Optics and Photonics, University of Central Florida, 304 Scorpius St, Orlando, FL 32826

    2016-01-15

    Operation of continuous wave quantum cascade lasers with a frequency-shifted feedback provided by an acousto-optic modulator is reported. Measured linewidth of 1.7 cm{sup −1} for these devices, under CW operating conditions, was in a good agreement with predictions of a model based on frequency-shifted feedback seeded by spontaneous emission. Linewidth broadening was observed for short sweep times, consistent with sound wave grating period variation across the illuminated area on the acousto-optic modulator. Standoff detection capability of the AOM-based QCL setup was demonstrated for several solid materials.

  15. 40 CFR 264.340 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Incinerators § 264... waste incinerators (as defined in § 260.10 of this chapter), except as § 264.1 provides otherwise. (b...

  16. Integrating an incident management system within a continuity of operations programme: case study of the Bank of Canada.

    PubMed

    Loop, Carole

    2013-01-01

    Carrying out critical business functions without interruption requires a resilient and robust business continuity framework. By embedding an industry-standard incident management system within its business continuity structure, the Bank of Canada strengthened its response plan by enabling timely response to incidents while maintaining a strong focus on business continuity. A total programme approach, integrating the two disciplines, provided for enhanced recovery capabilities. While the value of an effective and efficient response organisation is clear, as demonstrated by emergency events around the world, incident response structures based on normal operating hierarchy can experience unique challenges. The internationally-recognised Incident Command System (ICS) model addresses these issues and reflects the five primary incident management functions, each contributing to the overall strength and effectiveness of the response organisation. The paper focuses on the Bank of Canada's successful implementation of the ICS model as its incident management and continuity of operations programmes evolved to reflect current best practices.

  17. An evaluation of grease-type ball bearing lubricants operation in various environments

    NASA Technical Reports Server (NTRS)

    Mcmurtrey, E. L.

    1983-01-01

    Because many future spacecraft or space stations will require mechanisms to operate for long periods of time in environments which are adverse to most bearing lubricants, a series of tests is continuing to evaluate 38 grease type lubricants in R-4 size bearings in five different environments for a 1 year period. Four repetitions of each test are made to provide statistical samples. These tests have also been used to select four lubricants for 5 year tests in selected environments with five repetitions of each test for statistical samples. At the present time, 142 test sets have been completed and 30 test sets are underway. The three 5 year tests in (1) continuous operation and (2) start stop operation, with both in vacuum at ambient temperatures, and (3) continuous vacuum operation at 93.3 C are now completed. To date, in both the 1 year and 5 year tests, the best results in all environments have been obtained with a high viscosity index perfluoroalkylpolyether (PFPE) grease.

  18. Human-Robot Interaction Literature Review

    DTIC Science & Technology

    2012-03-01

    coordination, operation of non-simulated UVs, and mixed UAV and UGV systems . Recommendations THRIL should focus on studies that look at operating non...Security, 2012). UAVs were continued to be developed in operations such as Desert Storm, where the Pioneer UAV system provided intelligence and fire... systems . One of the programs that was part of the initial fielding of UGVs in military operations was the Vehicle Teleoperation Capability (VTC). The

  19. Commercialization and Industrial Development for the Fetal Hear Rate Monitor

    NASA Technical Reports Server (NTRS)

    Zahorian, Stephen

    2000-01-01

    The primary objectives for this task were to continue the development and testing of the NASA/ODU passive acoustic fetal heart rate monitor, with the goal of transferring the technology to the commercial sector. Areas of work included: 1. To assist in the development of a new hardware front end electronics box for the fetal heart rate monitor, so as to reduce the size of the electronics box, and also to provide for a "low-frequency" and "high-frequency" mode of operation. To make necessary changes in the operating software to support the two modes of operation. 2. To provide an option for a strip chart recording for the system, so that medical personnel could more easily make comparisons with ultra sound strip chart recordings. and 3. To help with continued testing of the system.

  20. 7 CFR 1944.254 - Program costs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... supplies (including food) necessary to provide services; (iv) Operational costs of a transportation service... development of the application and plan of operations before the effective date of CHSP grant award; (vi...

  1. 40 CFR 265.1201 - Design and operating standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Design and operating standards. 265.1201 Section 265.1201 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID...) Provide monitoring and inspection procedures that assure the controls and containment systems are working...

  2. 47 CFR 101.107 - Frequency tolerance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE... to private operational fixed point-to-point microwave and stations providing MVDDS. 5 For private operational fixed point-to-point microwave systems, with a channel greater than or equal to 50 KHz bandwidth...

  3. Acoustic transducer with damping means

    DOEpatents

    Smith, Richard W.; Adamson, Gerald E.

    1976-11-02

    An ultrasonic transducer specifically suited to high temperature sodium applications is described. A piezoelectric active element is joined to the transducer faceplate by coating the faceplate and juxtaposed active element face with wetting agents specifically compatible with the bonding procedure employed to achieve the joint. The opposite face of the active element is fitted with a backing member designed to assure continued electrical continuity during adverse operating conditions which can result in the fracturing of the active element. The fit is achieved employing a spring-loaded electrode operably arranged to electrically couple the internal transducer components, enclosed in a hermetically sealed housing, to accessory components normally employed in transducer applications. Two alternative backing members are taught for assuring electrical continuity. The first employs a resilient, discrete multipoint contact electrode in electrical communication with the active element face. The second employs a resilient, elastomeric, electrically conductive, damped member in electrical communication with the active element face in a manner to effect ring-down of the transducer. Each embodiment provides continued electrical continuity within the transducer in the event the active element fractures, while the second provides the added benefit of damping.

  4. Sensing system development for HOV/HOT (high occupancy vehicle) lane monitoring.

    DOT National Transportation Integrated Search

    2011-02-01

    With continued interest in the efficient use of roadways the ability to monitor the use of HOV/HOT lanes is essential for management, planning and operation. A system to reliably monitor these lanes on a continuous basis and provide usage statistics ...

  5. 40 CFR 68.20 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Hazard Assessment § 68.20 Applicability. The owner or operator of a... § 68.25 of this part and complete the five-year accident history as provided in § 68.42. The owner or...

  6. 46 CFR 180.207 - Survival craft-vessels operating on lakes, bays, and sounds routes.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... sounds routes. 180.207 Section 180.207 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED... Survival Craft § 180.207 Survival craft—vessels operating on lakes, bays, and sounds routes. (a) Except as... operate on a lakes, bays, and sounds route in cold water must either: (1) Be provided with life floats of...

  7. 46 CFR 180.207 - Survival craft-vessels operating on lakes, bays, and sounds routes.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... sounds routes. 180.207 Section 180.207 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED... Survival Craft § 180.207 Survival craft—vessels operating on lakes, bays, and sounds routes. (a) Except as... operate on a lakes, bays, and sounds route in cold water must either: (1) Be provided with life floats of...

  8. 46 CFR 180.207 - Survival craft-vessels operating on lakes, bays, and sounds routes.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... sounds routes. 180.207 Section 180.207 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED... Survival Craft § 180.207 Survival craft—vessels operating on lakes, bays, and sounds routes. (a) Except as... operate on a lakes, bays, and sounds route in cold water must either: (1) Be provided with life floats of...

  9. 46 CFR 180.207 - Survival craft-vessels operating on lakes, bays, and sounds routes.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... sounds routes. 180.207 Section 180.207 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED... Survival Craft § 180.207 Survival craft—vessels operating on lakes, bays, and sounds routes. (a) Except as... operate on a lakes, bays, and sounds route in cold water must either: (1) Be provided with life floats of...

  10. 46 CFR 180.207 - Survival craft-vessels operating on lakes, bays, and sounds routes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... sounds routes. 180.207 Section 180.207 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED... Survival Craft § 180.207 Survival craft—vessels operating on lakes, bays, and sounds routes. (a) Except as... operate on a lakes, bays, and sounds route in cold water must either: (1) Be provided with life floats of...

  11. Landsat Data Continuity Mission (LDCM) Flight Dynamics System (FDS)

    NASA Technical Reports Server (NTRS)

    Good, Susan M.; Nicholson, Ann M.

    2012-01-01

    The Landsat Data Continuity Mission (LDCM) will be launched in January 2013 to continue the legacy of Landsat land imagery collection that has been on-going for the past 40 years. While the overall mission and science goals are designed to produce the SAME data over the years, the ground systems designed to support the mission objectives have evolved immensely. The LDCM Flight Dynamics System (FDS) currently being tested and deployed for operations is highly automated and well integrated with the other ground system elements. The FDS encompasses the full suite of flight dynamics functional areas, including orbit and attitude determination and prediction, orbit and attitude maneuver planning and execution, and planning product generation. The integration of the orbit, attitude, maneuver, and products functions allows a very smooth flow for daily operations support with minimal input needed from the operator. The system also provides a valuable real-time component that monitors the on-board orbit and attitude during every ground contact and will autonomously alert the Flight Operations Team (FOT) personnel when any violations are found. This paper provides an overview of the LDCM Flight Dynamics System and a detailed description of how it is used to support space operations. For the first time on a Goddard Space Flight Center (GSFC)-managed mission, the ground attitude and orbits systems are fully integrated into a cohesive package. The executive engine of the FDS permits three levels of automation: low, medium, and high. The high-level, which will be the standard mode for LDCM, represents nearly lights-out operations. The paper provides an in-depth look at these processes within the FDS in support of LDCM in all mission phases.

  12. Developing the design of a continuous national health survey for New Zealand

    PubMed Central

    2013-01-01

    Background A continuously operating survey can yield advantages in survey management, field operations, and the provision of timely information for policymakers and researchers. We describe the key features of the sample design of the New Zealand (NZ) Health Survey, which has been conducted on a continuous basis since mid-2011, and compare to a number of other national population health surveys. Methods A number of strategies to improve the NZ Health Survey are described: implementation of a targeted dual-frame sample design for better Māori, Pacific, and Asian statistics; movement from periodic to continuous operation; use of core questions with rotating topic modules to improve flexibility in survey content; and opportunities for ongoing improvements and efficiencies, including linkage to administrative datasets. Results and discussion The use of disproportionate area sampling and a dual frame design resulted in reductions of approximately 19%, 26%, and 4% to variances of Māori, Pacific and Asian statistics respectively, but at the cost of a 17% increase to all-ethnicity variances. These were broadly in line with the survey’s priorities. Respondents provided a high degree of cooperation in the first year, with an adult response rate of 79% and consent rates for data linkage above 90%. Conclusions A combination of strategies tailored to local conditions gives the best results for national health surveys. In the NZ context, data from the NZ Census of Population and Dwellings and the Electoral Roll can be used to improve the sample design. A continuously operating survey provides both administrative and statistical advantages. PMID:24364838

  13. Continuous quality improvement for continuity of care.

    PubMed

    Kibbe, D C; Bentz, E; McLaughlin, C P

    1993-03-01

    Continuous quality improvement (CQI) techniques have been used most frequently in hospital operations such as pharmaceutical ordering, patient admitting, and billing of insurers, and less often to analyze and improve processes that are close to the clinical interaction of physicians and their patients. This paper describes a project in which CQI was implemented in a family practice setting to improve continuity of care. A CQI study team was assembled in response to patients' complaints about not being able to see their regular physician providers when they wanted. Following CQI methods, the performance of the practice in terms of provider continuity was measured. Two "customer" groups were surveyed: physician faculty members were surveyed to assess their attitudes about continuity, and patients were surveyed about their preferences for provider continuity and convenience factors. Process improvements were selected in the critical pathways that influence provider continuity. One year after implementation of selected process improvements, repeat chart audit showed that provider continuity levels had improved from .45 to .74, a 64% increase from 1 year earlier. The project's main accomplishment was to establish the practicality of using CQI methods in a primary care setting to identify a quality issue of value to both providers and patients, in this case, continuity of provider care, and to identify processes that linked the performance of health care delivery procedures with patient expectations.

  14. Human Behaviour in High Stress Situations in Aerospace Operations Conference Proceedings Held in The Hague, The Netherlands on 24-28 October 1988

    DTIC Science & Technology

    1989-06-01

    Continuously stimulating advances in the aerospace sciences relevant to strengthening the common defence posture; - Improving the co-operation among member...very stimulating symposium. vii KI-1 PREDICTION OF PERSONALITY Harald T. Andersen M.D., Ph.D., D.Sc,D.Av.Med. Director RNoAF Institute of Aviation...audio tape recorder which was connected to the aircraft communication system. This recorder provided a continuous auditory record of each mission so that

  15. 7 CFR 246.4 - State plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... distribute nutrition services and administration funds, including start-up funds, to local agencies operating... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program is operated in accordance with the State Plan. FNS will provide written approval or denial of a...

  16. 7 CFR 246.4 - State plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... distribute nutrition services and administration funds, including start-up funds, to local agencies operating... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program is operated in accordance with the State Plan. FNS will provide written approval or denial of a...

  17. 33 CFR 150.602 - What occupational awareness training is required?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Safety and Health (general) § 150.602 What occupational awareness training is required? (a) Each deepwater port operator must ensure that all deepwater port personnel are provided with information and...

  18. Different operational meanings of continuous variable Gaussian entanglement criteria and Bell inequalities

    NASA Astrophysics Data System (ADS)

    Buono, D.; Nocerino, G.; Solimeno, S.; Porzio, A.

    2014-07-01

    Entanglement, one of the most intriguing aspects of quantum mechanics, marks itself into different features of quantum states. For this reason different criteria can be used for verifying entanglement. In this paper we review some of the entanglement criteria casted for continuous variable states and link them to peculiar aspects of the original debate on the famous Einstein-Podolsky-Rosen (EPR) paradox. We also provide a useful expression for valuating Bell-type non-locality on Gaussian states. We also present the experimental measurement of a particular realization of the Bell operator over continuous variable entangled states produced by a sub-threshold type-II optical parametric oscillators (OPOs).

  19. Recent Enhancements to the National Transonic Facility (Mixed Mode Operations)

    NASA Technical Reports Server (NTRS)

    Kilgore, W. Allen; Chan, David; Balakrishna, S.; Wahls, Richard A.

    2006-01-01

    The U.S. National Transonic Facility continues to make enhancements to provide quality data in a safe, efficient and cost effective method for aerodynamic ground testing. Recent enhancements discussed in this paper include the development of a Mixed-mode of operations that combine Air-mode operations with Nitrogen-mode operations. This implementation and operational results of this new Mixed-mode expands the ambient temperature transonic region of testing beyond the Air-mode limitations at a significantly reduced cost over Nitrogen Mode operation.

  20. International Space Station Environmental Control and Life Support System Status: 2008 - 2009

    NASA Technical Reports Server (NTRS)

    Williams, David E.; Gentry, Gregory J.; Gentry, Gregory J.

    2009-01-01

    The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between March 2008 and February 2009. The ISS continued permanent crew operations, with the continuation of Phase 3 of the ISS Assembly Sequence. Work continues on the last of the Phase 3 pressurized elements and the continued manufacturing and testing of the regenerative ECLS equipment.

  1. Investigations conducted by the U.S. Geological Survey: A part of Chapter 5 in Twenty-first biennial report of the State Engineer to the governor of Utah: 1936-1938

    USGS Publications Warehouse

    Taylor, G.H.; Thomas, H.E.

    1938-01-01

    A summary of past investigations in Utah and a description of the work done during the 1934-36 biennium are included in the State Engineer’s Twentieth Biennial Report (pp. 91-106). Co-operative investigation with the State Engineer, begun on July 1, 1935, has been continued during the past biennium. To provide for this work, the 1935 Utah State Legislature appropriated \\$10,000 to the State Engineer, this sum being matched by the U. S. Geological Survey during the biennium ending June 30, 1937. During its 1937 session the State Legislature appropriated \\$5000 for continuation of co-operative work in underground waters. An equal sum was provided by the U. S. Geological Survey and investigations have continued during the fiscal year ending June 30, 1938.

  2. A status update on EUMETSAT programmes and plans

    NASA Astrophysics Data System (ADS)

    Klaes, K. Dieter

    2017-09-01

    The mandate of EUMETSAT is providing space observations for operational meteorology and climate monitoring. EUMETSAT operates geostationary and sun-synchronous polar orbiting satellites through mandatory programmes. Optional programmes provide further observations for altimetry and oceanography. EUMETSAT makes available data from partner agencies' satellites to the user community through third party programmes. The current fleet of operational geostationary spacecraft comprises Meteosat-7, which is the last satellite of the first generation and the four satellites of the Second Generation of Meteosat (MSG), Meteosat-8, Meteosat-9, Meteosat-10 and Meteosat-11. The EUMETSAT Polar System (EPS) provides data from sun-synchronous polar orbit with currently two satellites: Metop-B, the second of a series of three satellites, launched in September 2012 and currently the prime satellite, and Metop-A, the first of the series, in orbit since October 2006. These satellites are part of the Initial Joint Polar System (IJPS) together with the US. EUMETSAT's first optional programme continues to provide data from the Jason-2 satellite since summer 2008. The follow on satellite Jason-3 was successfully launched and commissioned in 2016 and is now providing the reference altimetry mission. To assure continuity in the mandatory missions the development of Meteosat Third Generation (MTG) is ongoing. The EPS-SG EPS Second generation) programme is now under full development. In the frame of the Copernicus Programme EUMETSAT operates the Sentinel-3A satellite, which was launched in February 2016. EUMETSAT is providing operational marine products from the Sentinel-3A satellite. Sentinel-3B, is scheduled to be launched early 2018.

  3. STS Derived Exploration Launch Operations

    NASA Technical Reports Server (NTRS)

    Best, Joel; Sorge, L.; Siders, J.; Sias, Dave

    2004-01-01

    A key aspect of the new space exploration programs will be the approach to optimize launch operations. A STS Derived Launch Vehicle (SDLV) Program can provide a cost effective, low risk, and logical step to launch all of the elements of the exploration program. Many benefits can be gained by utilizing the synergy of a common launch site as an exploration spaceport as well as evolving the resources of the current Space Shuttle Program (SSP) to meet the challenges of the Vision for Space Exploration. In particular, the launch operation resources of the SSP can be transitioned to the exploration program and combined with the operations efficiencies of unmanned EELVs to obtain the best of both worlds, resulting in lean launch operations for crew and cargo missions of the exploration program. The SDLV Program would then not only capture the extensive human space flight launch operations knowledge, but also provide for the safe fly-out of the SSP through continuity of system critical skills, manufacturing infrastructure, and ability to maintain and attract critical skill personnel. Thus, a SDLV Program can smoothly transition resources from the SSP and meet the transportation needs to continue the voyage of discovery of the space exploration program.

  4. 42 CFR 489.62 - Requirement waived for Government-operated HHAs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Requirement waived for Government-operated HHAs. 489.62 Section 489.62 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION PROVIDER AGREEMENTS AND SUPPLIER APPROVAL Surety...

  5. 42 CFR 489.62 - Requirement waived for Government-operated HHAs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Requirement waived for Government-operated HHAs. 489.62 Section 489.62 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION PROVIDER AGREEMENTS AND SUPPLIER APPROVAL Surety...

  6. 47 CFR 76.504 - Limits on carriage of vertically integrated programming.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... programming. 76.504 Section 76.504 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST... Limits on carriage of vertically integrated programming. (a) Except as otherwise provided in this section... national video programming services owned by the cable operator or in which the cable operator has an...

  7. Operations and Maintenance Manual, Atmospheric Contaminant Sensor, Revision B.

    ERIC Educational Resources Information Center

    National Aeronautics and Space Administration, Washington, DC.

    The sensor is a mass spectrometer system which continuously monitors the atmospheric constituents of hydrogen, water vapor, nitrogen, oxygen, and carbon dioxide, and monitors the Freons on a demand sampling basis. The manual provides a system description, operational procedures, and maintenance and troubleshooting instructions. Circuit diagrams…

  8. Fixed Route Comprehensive Operational Analysis, 1994 Operating Year. Fourth Installment, Route 2: Berkshire Shopping Center Analysis

    DOT National Transportation Integrated Search

    1995-03-01

    The study evaluated the performance of the service, analyzed possible alternatives, and recommended several service changes, which took effect in August of 1993. By use of ongoing data collection, HART intends to provide continual analysis of the ser...

  9. 49 CFR 199.113 - Employee assistance program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing § 199.113 Employee assistance program. (a) Each operator shall provide an employee... must be drug tested based on reasonable cause. The operator may establish the EAP as a part of its...

  10. 49 CFR 199.113 - Employee assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing § 199.113 Employee assistance program. (a) Each operator shall provide an employee... must be drug tested based on reasonable cause. The operator may establish the EAP as a part of its...

  11. 49 CFR 199.113 - Employee assistance program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing § 199.113 Employee assistance program. (a) Each operator shall provide an employee... must be drug tested based on reasonable cause. The operator may establish the EAP as a part of its...

  12. 49 CFR 199.113 - Employee assistance program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing § 199.113 Employee assistance program. (a) Each operator shall provide an employee... must be drug tested based on reasonable cause. The operator may establish the EAP as a part of its...

  13. 49 CFR 199.113 - Employee assistance program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing § 199.113 Employee assistance program. (a) Each operator shall provide an employee... must be drug tested based on reasonable cause. The operator may establish the EAP as a part of its...

  14. 33 CFR 127.1305 - Operations Manual.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... personnel of the facility; (e) A description for each security system provided for the transfer area; (f) A... Section 127.1305 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED... Operations Manual must contain— (a) A description of each liquid-transfer system and vapor transfer system...

  15. 47 CFR 76.504 - Limits on carriage of vertically integrated programming.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... programming. 76.504 Section 76.504 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST... Limits on carriage of vertically integrated programming. (a) Except as otherwise provided in this section... national video programming services owned by the cable operator or in which the cable operator has an...

  16. 49 CFR 195.440 - Public awareness.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Public awareness. 195.440 Section 195.440... PIPELINE Operation and Maintenance § 195.440 Public awareness. (a) Each pipeline operator must develop and implement a written continuing public education program that follows the guidance provided in the American...

  17. 49 CFR 195.440 - Public awareness.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Public awareness. 195.440 Section 195.440... PIPELINE Operation and Maintenance § 195.440 Public awareness. (a) Each pipeline operator must develop and implement a written continuing public education program that follows the guidance provided in the American...

  18. Operation Breakthrough for Continuous Self-Systems Improvement.

    ERIC Educational Resources Information Center

    Given, Barbara K.

    1994-01-01

    Operation Breakthrough, in which graduate student interns teach life skills to adolescents with learning disabilities, provided an impetus for identifying a profile of learning and work habits necessary for production of an agile workforce. Agile learning for self-systems improvement calls for self-empowered learning, collaborative learning,…

  19. 26 CFR 1.826-1 - Election by reciprocal underwriters and interinsurers.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES Mutual Insurance Companies (other Than Life and Certain Marine Insurance Companies and Other Than Fire Or Flood Insurance Companies Which Operate on Basis of...) In general. Except as otherwise provided in section 826(c), any mutual insurance company which is an...

  20. 26 CFR 1.825-1 - Unused loss deduction; in general.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... TAX (CONTINUED) INCOME TAXES (CONTINUED) Mutual Insurance Companies (other Than Life and Certain Marine Insurance Companies and Other Than Fire Or Flood Insurance Companies Which Operate on Basis of.... Section 825(a) provides that the unused loss deduction of a mutual insurance company subject to the tax...

  1. 26 CFR 1.825-1 - Unused loss deduction; in general.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... TAX (CONTINUED) INCOME TAXES (CONTINUED) Mutual Insurance Companies (other Than Life and Certain Marine Insurance Companies and Other Than Fire Or Flood Insurance Companies Which Operate on Basis of.... Section 825(a) provides that the unused loss deduction of a mutual insurance company subject to the tax...

  2. 26 CFR 1.825-1 - Unused loss deduction; in general.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... TAX (CONTINUED) INCOME TAXES (CONTINUED) Mutual Insurance Companies (other Than Life and Certain Marine Insurance Companies and Other Than Fire Or Flood Insurance Companies Which Operate on Basis of.... Section 825(a) provides that the unused loss deduction of a mutual insurance company subject to the tax...

  3. 26 CFR 1.825-1 - Unused loss deduction; in general.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... TAX (CONTINUED) INCOME TAXES (CONTINUED) Mutual Insurance Companies (other Than Life and Certain Marine Insurance Companies and Other Than Fire Or Flood Insurance Companies Which Operate on Basis of.... Section 825(a) provides that the unused loss deduction of a mutual insurance company subject to the tax...

  4. Rotordynamic Instability Problems in High-Performance Turbomachinery, 1990

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The present workshop continues to report field experience and experimental results, and it expands the use of computational and control techniques with the integration of damper, bearing, and eccentric seal operation results. The intent of the workshop was to provide a continuing impetus for an understanding and resolution of these problems.

  5. High Temporal Resolution Tropospheric Wind Profile Observations at NASA Kennedy Space Center During Hurricane Irma

    NASA Technical Reports Server (NTRS)

    Decker, Ryan; Barbre, Robert; Huddleston, Lisa; Wilfong, Tim; Brauer, Tom

    2018-01-01

    The NASA Kennedy Space Center (KSC) operates a 48-MHz Tropospheric/Stratospheric Doppler Radar Wind Profiler (TDRWP) on a continual basis generating wind profiles between 2-19 km in the support of space launch vehicle operations. A benefit of the continual operability of the system is the ability to provide unique observations of severe weather events such as hurricanes. On the evening of 10 September 2017, Hurricane Irma passed within 100 miles to the west of KSC through the middle of the Florida peninsula. The hurricane was responsible for power outages to approximately 2/3 of Florida's population. This paper will describe the characteristics of the tropospheric wind observations from the TDRWP during Irma, provide a comparison to previous TDRWP observations from Hurricane Matthew in 2016, and discuss lessons learned regarding dissemination of TDRWP data during the event.

  6. Avoiding Focus Shifts in Surgical Telementoring Using an Augmented Reality Transparent Display.

    PubMed

    Andersen, Daniel; Popescu, Voicu; Cabrera, Maria Eugenia; Shanghavi, Aditya; Gomez, Gerardo; Marley, Sherri; Mullis, Brian; Wachs, Juan

    2016-01-01

    Conventional surgical telementoring systems require the trainee to shift focus away from the operating field to a nearby monitor to receive mentor guidance. This paper presents the next generation of telementoring systems. Our system, STAR (System for Telementoring with Augmented Reality) avoids focus shifts by placing mentor annotations directly into the trainee's field of view using augmented reality transparent display technology. This prototype was tested with pre-medical and medical students. Experiments were conducted where participants were asked to identify precise operating field locations communicated to them using either STAR or a conventional telementoring system. STAR was shown to improve accuracy and to reduce focus shifts. The initial STAR prototype only provides an approximate transparent display effect, without visual continuity between the display and the surrounding area. The current version of our transparent display provides visual continuity by showing the geometry and color of the operating field from the trainee's viewpoint.

  7. 75 FR 63846 - Statement of Organization, Functions and Delegations of Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-18

    ... Preparedness and Continuity of Operations (RA15). Office of the Director (RA1) Provides overall leadership... health care for vulnerable populations worldwide; (3) provides leadership and direction to improve the...; (4) provides leadership and direction in the development of policies on health information technology...

  8. Wireless online position monitoring of manual valve types for plant configuration management in nuclear power plants

    DOE PAGES

    Agarwal, Vivek; Buttles, John W.; Beaty, Lawrence H.; ...

    2016-10-05

    In the current competitive energy market, the nuclear industry is committed to lower the operations and maintenance cost; increase productivity and efficiency while maintaining safe and reliable operation. The present operating model of nuclear power plants is dependent on large technical staffs that put the nuclear industry at long-term economic disadvantage. Technology can play a key role in nuclear power plant configuration management in offsetting labor costs by automating manually performed plant activities. The technology being developed, tested, and demonstrated in this paper will enable the continued safe operation of today’s fleet of light water reactors by providing the technicalmore » means to monitor components in plants today that are only routinely monitored through manual activities. The wireless enabled valve position indicators that are the subject of this paper are able to provide a valid position indication available continuously, rather than only periodically. As a result, a real-time (online) availability of valve positions using an affordable technologies are vital to plant configuration when compared with long-term labor rates, and provide information that can be used for a variety of plant engineering, maintenance, and management applications.« less

  9. Wireless online position monitoring of manual valve types for plant configuration management in nuclear power plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Agarwal, Vivek; Buttles, John W.; Beaty, Lawrence H.

    In the current competitive energy market, the nuclear industry is committed to lower the operations and maintenance cost; increase productivity and efficiency while maintaining safe and reliable operation. The present operating model of nuclear power plants is dependent on large technical staffs that put the nuclear industry at long-term economic disadvantage. Technology can play a key role in nuclear power plant configuration management in offsetting labor costs by automating manually performed plant activities. The technology being developed, tested, and demonstrated in this paper will enable the continued safe operation of today’s fleet of light water reactors by providing the technicalmore » means to monitor components in plants today that are only routinely monitored through manual activities. The wireless enabled valve position indicators that are the subject of this paper are able to provide a valid position indication available continuously, rather than only periodically. As a result, a real-time (online) availability of valve positions using an affordable technologies are vital to plant configuration when compared with long-term labor rates, and provide information that can be used for a variety of plant engineering, maintenance, and management applications.« less

  10. Full Spectrum Information Operations and the Information Professional Officer Intermediate Qualification Process: Filling the Gap to Ensure the Continued Leadership of the Information Professional Community in the Area of Information Dominance

    DTIC Science & Technology

    2005-09-01

    information dominance . This thesis provides recommended line items for injection into the IP IQ in the appropriate format with discussions and definitions that address the specific line items. The thesis also provides further recommendations for the continuing improvement and refinement of the IP qualification process, especially in the area of

  11. Production of biofuels via bio-oil upgrading & refining

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elliott, Douglas C.

    2016-03-18

    This chapter provides cursory reviews of biomass liquefaction, relevant petroleum processing technology, and relevant model compound studies. More detail is provided for upgrading of biomass liquefaction products, including an overview of potential fractionation and catalytic processing methods, hydroprocessing as the primary means of interest, scale of operation, operating conditions and catalysts, and product properties. Batch results are included where needed to provide a more complete narrative, but continuous-flow operations are emphasized as being more informative. Liquid fuel products from biomass through direct liquefaction and hydroprocessing are discussed, such as fuel properties based on chemical analysis and comparison of petroleum fuelsmore » and biofuels.« less

  12. Mission operations and command assurance: Instilling quality into flight operations

    NASA Technical Reports Server (NTRS)

    Welz, Linda L.; Witkowski, Mona M.; Bruno, Kristin J.; Potts, Sherrill S.

    1993-01-01

    Mission Operations and Command Assurance (MO&CA) is a Total Quality Management (TQM) task on JPL projects to instill quality in flight mission operations. From a system engineering view, MO&CA facilitates communication and problem-solving among flight teams and provides continuous process improvement to reduce the probability of radiating incorrect commands to a spacecraft. The MO&CA task has evolved from participating as a member of the spacecraft team to an independent team reporting directly to flight project management and providing system level assurance. JPL flight projects have benefited significantly from MO&CA's effort to contain risk and prevent rather than rework errors. MO&CA's ability to provide direct transfer of knowledge allows new projects to benefit from previous and ongoing flight experience.

  13. Operational Art and the Sustainment Warfighting Function

    DTIC Science & Technology

    2011-12-01

    Infantry Division (ID) a continuous sustainment line of operation. The leap- frogging of Forward Logisitics Bases provided 3rd Infantry Division (ID...victims. A C-17 Globemaster III departed North Carolina and delivered 14,000 Meals Ready-to- Eat , or MREs, and 14,000 quarts of water in a 7-hour round

  14. Operations and maintenance manual, atmospheric contaminant sensor, revision B

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The sensor is a mass spectrometer system which continuously monitors the atmospheric constituents of hydrogen, water vapor, nitrogen, oxygen, and carbon dioxide, and monitors the Freons on a demand sampling basis. The manual provides a system description, operational procedures, and maintenance and troubleshooting instructions. Circuit diagrams are included.

  15. White paper on continuous bioprocessing. May 20-21, 2014 Continuous Manufacturing Symposium.

    PubMed

    Konstantinov, Konstantin B; Cooney, Charles L

    2015-03-01

    There is a growing interest in realizing the benefits of continuous processing in biologics manufacturing, which is reflected by the significant number of industrial and academic researchers who are actively involved in the development of continuous bioprocessing systems. These efforts are further encouraged by guidance expressed in recent US FDA conference presentations. The advantages of continuous manufacturing include sustained operation with consistent product quality, reduced equipment size, high-volumetric productivity, streamlined process flow, low-process cycle times, and reduced capital and operating cost. This technology, however, poses challenges, which need to be addressed before routine implementation is considered. This paper, which is based on the available literature and input from a large number of reviewers, is intended to provide a consensus of the opportunities, technical needs, and strategic directions for continuous bioprocessing. The discussion is supported by several examples illustrating various architectures of continuous bioprocessing systems. © 2014 Wiley Periodicals, Inc. and the American Pharmacists Association.

  16. 41 CFR 109-50.001 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS UTILIZATION AND DISPOSAL... direct DOE operations and to designated contractors only when specifically provided for in the...

  17. 47 CFR 95.1103 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PERSONAL RADIO... health care provider. A physician or other individual authorized under state or federal law to provide health care services, or any other health care facility operated by or employing individuals authorized...

  18. Advanced air traffic management

    NASA Technical Reports Server (NTRS)

    Wangermann, J. P.

    1993-01-01

    Air traffic worldwide continues to grow, and this growth is predicted to continue in the coming decades. Air traffic management (ATM) systems in several parts of the world have now reached their operating limits. The external symptoms of this are increases in the number of delays experienced by the system, and a rise in the frequency of near-misses. If the ATM system fails to develop to provide more capacity, then the result will be a decrease in safety levels, and increasing delays, or a limit on the number of permitted aircraft operations.

  19. Connecticut Biodiesel Power Generation Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grannis, Lee; York, Carla R.

    Sabre will continue support of the emissions equipment and VARS issues to ensure all are resolved and the system is functioning as expected. The remote data collection to become more automated. Final project reports for data collection and system performance to be generated. Sabre continued to support the emissions equipment and VARS issues to ensure all are resolved and the system is functioning as expected. The remote data collection became more automated. Final project reports for data collection and system performance were generated and are part of this final report. Some Systems Sensors were replaced due to a lightning strike.more » Sample data charts are shown at the end of the report. During the project, Sabre Engineering provided support to the project team with regarding to troubleshooting technical issues and system integration with the local power utility company. The resulting lessons learned through Sabre’s participation in the project have been valuable to the integrity of the data collected as well as in providing BioPur Light & Power valuable insights into future operations and planning for possible expansion. The system monitoring and data collection system has been operating as designed and continues to provide relevant information to the system operators. The information routinely gathered automatically by the system also contributes to the REN and REC validations which are required to secure credit for these items. During the quarter, the remaining work on the operations and safety manual were completed and released for publication after screen shots were verified. The goal of this effort to provide an accurate set of precautions and procedures for the technology system that can be replicated to other similar system.« less

  20. Provider-owned health plans: El Dorado or Armageddon?

    PubMed

    McCarthy, E J

    1999-11-01

    The development of provider-owned health plans continues to be an important strategy of integrated delivery systems (IDSs). While HMO enrollment growth has continued, reaching almost 70 million people, average health plan profit margins have declined from 8 percent in 1994 to less than 1 percent in 1997. About 56 percent of HMOs lost money in 1998. The ability to successfully develop and operate a provider-owned HMO is affected by conditions inherent to the managed care industry, the level of cooperation among IDS business, units, and local market conditions.

  1. An Approach To Using All Location Tagged Numerical Data Sets As Continuous Fields With User-Assigned Continuity As A Basis For User-Driven Data Assimilation

    NASA Astrophysics Data System (ADS)

    Vernon, F.; Arrott, M.; Orcutt, J. A.; Mueller, C.; Case, J.; De Wardener, G.; Kerfoot, J.; Schofield, O.

    2013-12-01

    Any approach sophisticated enough to handle a variety of data sources and scale, yet easy enough to promote wide use and mainstream adoption is required to address the following mappings: - From the authored domain of observation to the requested domain of interest; - From the authored spatiotemporal resolution to the requested resolution; and - From the representation of data placed on wide variety of discrete mesh types to the use of that data as a continuos field with a selectable continuity. The Open Geospatial Consortium's (OGC) Reference Model[1] with its direct association with the ISO 19000 series standards provides a comprehensive foundation to represent all data on any type of mesh structure, aka "Discrete Coverages". The Reference Model also provides the specification for the core operations required to utilize any Discrete Coverage. The FEniCS Project[2] provides a comprehensive model for how to represent the Basis Functions on mesh structures as "Degrees of Freedom" to present discrete data as continuous fields with variable continuity. In this talk, we will present the research and development the OOI Cyberinfrastructure Project is pursuing to integrate these approaches into a comprehensive Application Programming Interface (API) to author, acquire and operate on the broad range of data formulation from time series, trajectories and tables through to time variant finite difference grids and finite element meshes.

  2. The International Space Station: Operations and Assembly - Learning From Experiences - Past, Present, and Future

    NASA Technical Reports Server (NTRS)

    Fuller, Sean; Dillon, William F.

    2006-01-01

    As the Space Shuttle continues flight, construction and assembly of the International Space Station (ISS) carries on as the United States and our International Partners resume the building, and continue to carry on the daily operations, of this impressive and historical Earth-orbiting research facility. In his January 14, 2004, speech announcing a new vision for America s space program, President Bush ratified the United States commitment to completing construction of the ISS by 2010. Since the launch and joining of the first two elements in 1998, the ISS and the partnership have experienced and overcome many challenges to assembly and operations, along with accomplishing many impressive achievements and historical firsts. These experiences and achievements over time have shaped our strategy, planning, and expectations. The continual operation and assembly of ISS leads to new knowledge about the design, development and operation of systems and hardware that will be utilized in the development of new deep-space vehicles needed to fulfill the Vision for Exploration and to generate the data and information that will enable our programs to return to the Moon and continue on to Mars. This paper will provide an overview of the complexity of the ISS Program, including a historical review of the major assembly events and operational milestones of the program, along with the upcoming assembly plans and scheduled missions of the space shuttle flights and ISS Assembly sequence.

  3. Multi-stage microbial system for continuous hydrogen production

    DOEpatents

    Kosourov, Sergey; Ghirardi, Maria L.; Seibert, Michael

    2010-06-08

    A method of using sequential chemostat culture vessels to provide continuous H.sub.2 production, in which photosynthetic O.sub.2 evolution and H.sub.2 photoproduction are separated physically into two separate bioreactors, comprising: a) growing a microorganism culture able to continuously generate H.sub.2 by photosynthetically producing cells at about the early-to-late log state in a first photobioreactor operating as a sulfur chemostat under aerobic and/or conditions; b) continuously feeding cells from the first photobioreactor to a second photobioreactor operating under anaerobic conditions and sulfur deprivation conditions resulting from constant uptake of sulfate in the first bioreactor and a low rate of culture flow between the first and second bioreactors, for induction of hydrogenase and H.sub.2 photoproduction to allow for continuous cultivation of the microorganism's cells in the first photobioreactor and constant H.sub.2 production in the second photobioreactor, and c) H.sub.2 gas from the second photobioreactor.

  4. DEVELOPMENT AND EVALUATION OF A CONTINUOUS COARSE (PM10-PM2.5) PARTICLE MONITOR

    EPA Science Inventory

    In this paper, we describe the development and laboratory and field evaluation of a continuous coarse (2.5-10 um) particle mass (PM) monitor that can provide reliable measurements of the coarse mass (CM) concentrations in time intervals as short as 5-10 min. The operating princ...

  5. 26 CFR 1.823-8 - Special transitional underwriting loss; cross reference.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES Mutual Insurance Companies (other Than Life and Certain Marine Insurance Companies and Other Than Fire Or Flood Insurance Companies Which Operate on Basis of... 821(f) provides, for any company subject to the tax imposed by section 821(a), a special reduction in...

  6. 40 CFR 75.34 - Units with add-on emission controls.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROGRAMS (CONTINUED) CONTINUOUS EMISSION MONITORING Missing Data Substitution Procedures § 75.34 Units with... monitoring system(s) are not obtained. (1) The owner or operator may use the missing data substitution procedures specified in §§ 75.31 through 75.33 to provide substitute data for any missing data hour(s) in...

  7. 40 CFR 75.34 - Units with add-on emission controls.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMS (CONTINUED) CONTINUOUS EMISSION MONITORING Missing Data Substitution Procedures § 75.34 Units with... monitoring system(s) are not obtained. (1) The owner or operator may use the missing data substitution procedures specified in §§ 75.31 through 75.33 to provide substitute data for any missing data hour(s) in...

  8. 40 CFR 75.34 - Units with add-on emission controls.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROGRAMS (CONTINUED) CONTINUOUS EMISSION MONITORING Missing Data Substitution Procedures § 75.34 Units with... monitoring system(s) are not obtained. (1) The owner or operator may use the missing data substitution procedures specified in §§ 75.31 through 75.33 to provide substitute data for any missing data hour(s) in...

  9. 40 CFR 75.34 - Units with add-on emission controls.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROGRAMS (CONTINUED) CONTINUOUS EMISSION MONITORING Missing Data Substitution Procedures § 75.34 Units with... monitoring system(s) are not obtained. (1) The owner or operator may use the missing data substitution procedures specified in §§ 75.31 through 75.33 to provide substitute data for any missing data hour(s) in...

  10. 40 CFR 75.34 - Units with add-on emission controls.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS (CONTINUED) CONTINUOUS EMISSION MONITORING Missing Data Substitution Procedures § 75.34 Units with... monitoring system(s) are not obtained. (1) The owner or operator may use the missing data substitution procedures specified in §§ 75.31 through 75.33 to provide substitute data for any missing data hour(s) in...

  11. Continuing Education and the Pursuit of Excellence. NCCSCE Working Paper Series.

    ERIC Educational Resources Information Center

    Mitchell, Helen Buss

    Adapting the principles outlined in "In Search of Excellence: Lessons from America's Best Run Companies" (Thomas J. Peters and Robert H. Waterman, Jr.) to the operations of continuing education departments, this paper discusses eight rules for success and provides examples of their application. Rule One, "Bias for Action," emphasizes the…

  12. 26 CFR 1.1247-2 - Computation and distribution of taxable income.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES Special Rules for Determining Capital Gains and Losses § 1... net operating losses) shall not be allowed. (3) Except for the deduction provided in section 248... amount of the deduction allowed under section 164 there shall be included taxes paid or accrued during...

  13. Continuous-variable quantum network coding for coherent states

    NASA Astrophysics Data System (ADS)

    Shang, Tao; Li, Ke; Liu, Jian-wei

    2017-04-01

    As far as the spectral characteristic of quantum information is concerned, the existing quantum network coding schemes can be looked on as the discrete-variable quantum network coding schemes. Considering the practical advantage of continuous variables, in this paper, we explore two feasible continuous-variable quantum network coding (CVQNC) schemes. Basic operations and CVQNC schemes are both provided. The first scheme is based on Gaussian cloning and ADD/SUB operators and can transmit two coherent states across with a fidelity of 1/2, while the second scheme utilizes continuous-variable quantum teleportation and can transmit two coherent states perfectly. By encoding classical information on quantum states, quantum network coding schemes can be utilized to transmit classical information. Scheme analysis shows that compared with the discrete-variable paradigms, the proposed CVQNC schemes provide better network throughput from the viewpoint of classical information transmission. By modulating the amplitude and phase quadratures of coherent states with classical characters, the first scheme and the second scheme can transmit 4{log _2}N and 2{log _2}N bits of information by a single network use, respectively.

  14. From Prime to Extended Mission: Evolution of the MER Tactical Uplink Process

    NASA Technical Reports Server (NTRS)

    Mishkin, Andrew H.; Laubach, Sharon

    2006-01-01

    To support a 90-day surface mission for two robotic rovers, the Mars Exploration Rover mission designed and implemented an intensive tactical operations process, enabling daily commanding of each rover. Using a combination of new processes, custom software tools, a Mars-time staffing schedule, and seven-day-a-week operations, the MER team was able to compress the traditional weeks-long command-turnaround for a deep space robotic mission to about 18 hours. However, the pace of this process was never intended to be continued indefinitely. Even before the end of the three-month prime mission, MER operations began evolving towards greater sustainability. A combination of continued software tool development, increasing team experience, and availability of reusable sequences first reduced the mean process duration to approximately 11 hours. The number of workshifts required to perform the process dropped, and the team returned to a modified 'Earth-time' schedule. Additional process and tool adaptation eventually provided the option of planning multiple Martian days of activity within a single workshift, making 5-day-a-week operations possible. The vast majority of the science team returned to their home institutions, continuing to participate fully in the tactical operations process remotely. MER has continued to operate for over two Earth-years as many of its key personnel have moved on to other projects, the operations team and budget have shrunk, and the rovers have begun to exhibit symptoms of aging.

  15. 47 CFR 95.1105 - Eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PERSONAL RADIO... health care providers are authorized by rule to operate transmitters in the Wireless Medical Telemetry... authorized health care providers. No entity that is a foreign government or which is active in the capacity...

  16. 47 CFR 95.1105 - Eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PERSONAL RADIO... health care providers are authorized by rule to operate transmitters in the Wireless Medical Telemetry... authorized health care providers. No entity that is a foreign government or which is active in the capacity...

  17. Continuous flow technology vs. the batch-by-batch approach to produce pharmaceutical compounds.

    PubMed

    Cole, Kevin P; Johnson, Martin D

    2018-01-01

    For the manufacture of small molecule drugs, many pharmaceutical innovator companies have recently invested in continuous processing, which can offer significant technical and economic advantages over traditional batch methodology. This Expert Review will describe the reasons for this interest as well as many considerations and challenges that exist today concerning continuous manufacturing. Areas covered: Continuous processing is defined and many reasons for its adoption are described. The current state of continuous drug substance manufacturing within the pharmaceutical industry is summarized. Current key challenges to implementation of continuous manufacturing are highlighted, and an outlook provided regarding the prospects for continuous within the industry. Expert commentary: Continuous processing at Lilly has been a journey that started with the need for increased safety and capability. Over twelve years the original small, dedicated group has grown to more than 100 Lilly employees in discovery, development, quality, manufacturing, and regulatory designing in continuous drug substance processing. Recently we have focused on linked continuous unit operations for the purpose of all-at-once pharmaceutical manufacturing, but the technical and business drivers that existed in the very beginning for stand-alone continuous unit operations in hybrid processes have persisted, which merits investment in both approaches.

  18. 78 FR 19445 - Notice of Proposed New Fee Sites; Federal Lands Recreation Enhancement Act, (Title VIII, Pub. L...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... services provided, cost of operation and maintenance, market assessment, and public comment. Funds from fees would be used for the continued operation and maintenance of these recreation sites. Lake Canyon... development of numerous unauthorized roads and camping. The restoration project has closed unauthorized trails...

  19. 75 FR 21583 - Notice of Proposed New Fee Site; Federal Lands Recreation Enhancement Act (Title VIII, Pub. L...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... on the level of amenities and services provided, cost of operations and maintenance, market... comment. Funds from fees would be used for the continued operation and maintenance and improvements of..., serving tables, utility tables, information bulletins, fencing, improved roads and a host site. These...

  20. 76 FR 65375 - Drawbridge Operation Regulation; Passaic River, Harrison, NJ

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-21

    ... bridge openings will provide relief to the bridge owner while continuing to meet the reasonable needs of... opening may be delayed no more than ten minutes, unless the draw tender and the vessel operator... requested that a twenty four hour advance notice be required for all bridge openings, except during the...

  1. Self-Operated Auditory Prompting Systems: Creating and Using Them to Support Students with Disabilities

    ERIC Educational Resources Information Center

    Savage, Melissa N.

    2014-01-01

    Some students with disabilities develop a dependence on others for support and can benefit from self-management strategies to increase independence. Self-operated auditory prompting systems are an effective self-management intervention used to increase independence for students with disabilities while continuing to provide the support that they…

  2. 33 CFR 150.609 - When is eye and face protection required?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false When is eye and face protection... SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Eyes and Face § 150.609 When is eye and face protection required? The operator must provide eye and face protectors...

  3. 33 CFR 150.609 - When is eye and face protection required?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false When is eye and face protection... SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Eyes and Face § 150.609 When is eye and face protection required? The operator must provide eye and face protectors...

  4. 33 CFR 150.609 - When is eye and face protection required?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false When is eye and face protection... SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Eyes and Face § 150.609 When is eye and face protection required? The operator must provide eye and face protectors...

  5. 33 CFR 150.609 - When is eye and face protection required?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false When is eye and face protection... SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Eyes and Face § 150.609 When is eye and face protection required? The operator must provide eye and face protectors...

  6. 33 CFR 150.609 - When is eye and face protection required?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false When is eye and face protection... SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Eyes and Face § 150.609 When is eye and face protection required? The operator must provide eye and face protectors...

  7. 40 CFR 267.190 - Does this subpart apply to me?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED... part 270 subpart J standardized permit, except as provided in § 267.1(b). (a) You do not have to meet... presence of free liquids in the stored/treated waste, using Method 9095B (Paint Filter Liquids Test) as...

  8. Resident continuity of care experience in a Canadian general surgery training program

    PubMed Central

    Sidhu, Ravindar S.; Walker, G. Ross

    Objectives To provide baseline data on resident continuity of care experience, to describe the effect of ambulatory centre surgery on continuity of care, to analyse continuity of care by level of resident training and to assess a resident-run preadmission clinic’s effect on continuity of care. Design Data were prospectively collected for 4 weeks. All patients who underwent a general surgical procedure were included if a resident was present at operation. Setting The Division of General Surgery, Queen’s University, Kingston, Ont. Outcome measures Preoperative, operative and inhospital postoperative involvement of each resident with each case was recorded. Results Residents assessed preoperatively (before entering the operating room) 52% of patients overall, 20% of patients at the ambulatory centre and 83% of patients who required emergency surgery. Of patients assessed by the chief resident, 94% were assessed preoperatively compared with 32% of patients assessed by other residents ( p < 0.001). Of the admitted patients, 40% had complete resident continuity of care (preoperative, operative and postoperative). There was no statistical difference between this rate and that for emergency, chief-resident and non-chief-resident subgroups. Of the eligible patients, 58% were seen preoperatively by the resident on the preadmission clinic service compared with 54% on other services ( p > 0.1). Conclusions This study serves as a reference for the continuity of care experience in Canadian surgical programs. Residents assessed only 52% of patients preoperatively, and only 40% of patients had complete continuity of care. Factors such as ambulatory surgery and junior level of training negatively affected continuity experience. Such factors must be taken into account in planning surgical education. PMID:10526519

  9. Continuous Particulate Filter State of Health Monitoring Using Radio Frequency Sensing

    DOE PAGES

    Sappok, Alexander; Ragaller, Paul; Herman, Andrew; ...

    2018-04-03

    Reliable means for on-board detection of particulate filter failures or malfunctions are needed to meet diagnostics (OBD) requirements. Detecting these failures, which result in tailpipe particulate matter (PM) emissions exceeding the OBD limit, over all operating conditions is challenging. Current approaches employ differential pressure sensors and downstream PM sensors, in combination with particulate filter and engine-out soot models. These conventional monitors typically operate over narrowly-defined time windows and do not provide a direct measure of the filter’s state of health. In contrast, radio frequency (RF) sensors, which transmit a wireless signal through the filter substrate provide a direct means formore » interrogating the condition of the filter itself. Here, this study investigated the use of RF sensors for the continuous measurement of filter trapping efficiency, which was compared to downstream measurements with an AVL Microsoot Sensor, and a PM sampling probe simulating the geometry and installation configuration of a conventional PM sensor. The study included several particulate filter failure modes, both above and below the OBD threshold. Finally, the results confirmed the use of RF sensors to provide a direct and continuous measure of the particulate filter’s state of health over a range of typical in-use operating conditions, thereby significantly increasing the time window over which filter failures may be detected.« less

  10. Continuous Particulate Filter State of Health Monitoring Using Radio Frequency Sensing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sappok, Alexander; Ragaller, Paul; Herman, Andrew

    Reliable means for on-board detection of particulate filter failures or malfunctions are needed to meet diagnostics (OBD) requirements. Detecting these failures, which result in tailpipe particulate matter (PM) emissions exceeding the OBD limit, over all operating conditions is challenging. Current approaches employ differential pressure sensors and downstream PM sensors, in combination with particulate filter and engine-out soot models. These conventional monitors typically operate over narrowly-defined time windows and do not provide a direct measure of the filter’s state of health. In contrast, radio frequency (RF) sensors, which transmit a wireless signal through the filter substrate provide a direct means formore » interrogating the condition of the filter itself. Here, this study investigated the use of RF sensors for the continuous measurement of filter trapping efficiency, which was compared to downstream measurements with an AVL Microsoot Sensor, and a PM sampling probe simulating the geometry and installation configuration of a conventional PM sensor. The study included several particulate filter failure modes, both above and below the OBD threshold. Finally, the results confirmed the use of RF sensors to provide a direct and continuous measure of the particulate filter’s state of health over a range of typical in-use operating conditions, thereby significantly increasing the time window over which filter failures may be detected.« less

  11. Fine tuning GPS clock estimation in the MCS

    NASA Technical Reports Server (NTRS)

    Hutsell, Steven T.

    1995-01-01

    With the completion of a 24 operational satellite constellation, GPS is fast approaching the critical milestone, Full Operational Capability (FOC). Although GPS is well capable of providing the timing accuracy and stability figures required by system specifications, the GPS community will continue to strive for further improvements in performance. The GPS Master Control Station (MCS) recently demonstrated that timing improvements are always composite Clock, and hence, Kalman Filter state estimation, providing a small improvement to user accuracy.

  12. 20 CFR 670.500 - What services must Job Corps centers provide?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 4 2012-04-01 2012-04-01 false What services must Job Corps centers provide... LABOR (CONTINUED) THE JOB CORPS UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Program Activities and Center Operations § 670.500 What services must Job Corps centers provide? (a) Job Corps centers must...

  13. 20 CFR 670.500 - What services must Job Corps centers provide?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 4 2013-04-01 2013-04-01 false What services must Job Corps centers provide... LABOR (CONTINUED) THE JOB CORPS UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Program Activities and Center Operations § 670.500 What services must Job Corps centers provide? (a) Job Corps centers must...

  14. 20 CFR 670.500 - What services must Job Corps centers provide?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 4 2014-04-01 2014-04-01 false What services must Job Corps centers provide... LABOR (CONTINUED) THE JOB CORPS UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Program Activities and Center Operations § 670.500 What services must Job Corps centers provide? (a) Job Corps centers must...

  15. 40 CFR 792.105 - Test, control, and reference substance characterization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... or concomitantly according to written standard operating procedures, which provide for periodic...) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference...

  16. 40 CFR 792.105 - Test, control, and reference substance characterization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... or concomitantly according to written standard operating procedures, which provide for periodic...) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference...

  17. 40 CFR 792.105 - Test, control, and reference substance characterization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... or concomitantly according to written standard operating procedures, which provide for periodic...) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference...

  18. 40 CFR 792.105 - Test, control, and reference substance characterization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... or concomitantly according to written standard operating procedures, which provide for periodic...) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference...

  19. 49 CFR 199.115 - Contractor employees.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing... contractor, an operator may provide by contract that the drug testing, education, and training required by...

  20. 49 CFR 199.115 - Contractor employees.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing... contractor, an operator may provide by contract that the drug testing, education, and training required by...

  1. 49 CFR 199.115 - Contractor employees.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing... contractor, an operator may provide by contract that the drug testing, education, and training required by...

  2. 49 CFR 199.115 - Contractor employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing... contractor, an operator may provide by contract that the drug testing, education, and training required by...

  3. Improving performance of MFC by design alteration and adding cathodic electrolytes.

    PubMed

    Jadhav, G S; Ghangrekar, M M

    2008-12-01

    Performance of two microbial fuel cells (MFCs) was investigated under batch and continuous mode of operation using different cathodic electrolyte. The wastewater was supplied from the bottom port provided to the anode chamber in both the MFCs and the effluent left the anode chamber from the top port in MFC-1, whereas in MFC-2, the effluent exit was provided close to membrane. Stainless steel (SS) mesh anode was used in both the MFCs with surface area of 167 and 100 cm(2) in MFC-1 and MFC-2, respectively. Under batch mode and continuous mode of operation, these MFCs gave chemical oxygen demand removal efficiency more than 85% and about 68%, respectively. Under batch mode of operation, maximum power density of 39.95 and 56.87 mW/m(2) and maximum current density of 180.83 and 295 mA/m(2) were obtained in MFC-1 and MFC-2, respectively. Under continuous mode of operation, a reduction in power and current density was observed. Even with less surface area of the anode, MFC-2 produced more current (1.77 mA) than MFC-1 (1.40 mA). Among the cathodic electrolyte tested, these can be listed in decreasing order of power density as aerated KMnO(4) solution > KMnO(4) solution without aeration > aerated tap water > aerated tap water with NaCl.

  4. 50 CFR 260.101 - Lavatory accommodations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Fishery Products for Human Consumption Requirements for Plants Operating Under Continuous Inspection on A... water, soap, and single service towels, shall be provided. Such accommodations shall be in or near... which provides an adequate flow of water for washing hands. (d) Durable signs shall be posted...

  5. 50 CFR 260.101 - Lavatory accommodations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Fishery Products for Human Consumption Requirements for Plants Operating Under Continuous Inspection on A... water, soap, and single service towels, shall be provided. Such accommodations shall be in or near... which provides an adequate flow of water for washing hands. (d) Durable signs shall be posted...

  6. 10 CFR 810.7 - Generally authorized activities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... determined that the following activities are generally authorized, provided no sensitive nuclear technology... continuing programs, to enhance the operational safety of an existing civilian nuclear power plant in a... off-site population posed by a civilian nuclear power plant in such a country; provided the Department...

  7. 10 CFR 810.7 - Generally authorized activities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... determined that the following activities are generally authorized, provided no sensitive nuclear technology... continuing programs, to enhance the operational safety of an existing civilian nuclear power plant in a... off-site population posed by a civilian nuclear power plant in such a country; provided the Department...

  8. 49 CFR 236.301 - Where signals shall be provided.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 236.301 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... over a hand-operated switch into interlocking limits if the switch is provided with an electric lock..., electrically. Electric locks installed under this rule must conform to the time and approach locking...

  9. The Thermal Infrared Sensor on the Landsat Data Continuity Mission

    NASA Technical Reports Server (NTRS)

    Reuter, Dennis; Richardson, Cathy; Irons, James; Allen, Rick; Anderson, Martha; Budinoff, Jason; Casto, Gordon; Coltharp, Craig; Finneran, Paul; Forsbacka, Betsy; hide

    2010-01-01

    The Landsat Data Continuity Mission (LDCM), a joint NASA and USGS mission, is scheduled for launch in December, 2012. The LDCM instrument payload will consist of the Operational Land Imager (OLI), provided by Ball Aerospace and Technology Corporation (BATC} under contract to NASA and the Thermal Infrared Sensor (TIRS), provided by NASA's Goddard Space Flight Center (GSFC). This paper outlines the design of the TIRS instrument and gives an example of its application to monitoring water consumption by measuring evapotranspiration.

  10. Visual display aid for orbital maneuvering - Design considerations

    NASA Technical Reports Server (NTRS)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1993-01-01

    This paper describes the development of an interactive proximity operations planning system that allows on-site planning of fuel-efficient multiburn maneuvers in a potential multispacecraft environment. Although this display system most directly assists planning by providing visual feedback to aid visualization of the trajectories and constraints, its most significant features include: (1) the use of an 'inverse dynamics' algorithm that removes control nonlinearities facing the operator, and (2) a trajectory planning technique that separates, through a 'geometric spreadsheet', the normally coupled complex problems of planning orbital maneuvers and allows solution by an iterative sequence of simple independent actions. The visual feedback of trajectory shapes and operational constraints, provided by user-transparent and continuously active background computations, allows the operator to make fast, iterative design changes that rapidly converge to fuel-efficient solutions. The planning tool provides an example of operator-assisted optimization of nonlinear cost functions.

  11. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  12. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  13. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  14. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  15. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  16. 9 CFR 590.100 - Specific exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... inspection of processing operations in section 5(a) of the Act: Provided, That the conditions for exemption... limited to bakeries, restaurants, and other food processors, without continuous inspection, of certain...

  17. KSC-2009-3841

    NASA Image and Video Library

    2009-06-25

    CAPE CANAVERAL, Fla. – A prelaunch news conference on the Geostationary Operational Environmental Satellite-O mission is held in NASA's Kennedy Space Center press site auditorium. From left, the participants are George H. Diller, moderator, Media Services, Kennedy Space Center; Gary Davis, director, Office of Systems Development, NOAA Satellite and Information Service, Suitland, Md.; Kris Walsh, Commercial Programs manager, United Launch Alliance, Houston; Kevin Reyes, director, Business Development, Boeing Launch Services; Andre Dress, GOES-O deputy project manager, Goddard Space Flight Center; Charlie Maloney, GOES-O program manager, Boeing Space and Intelligence Systems, Seal Beach, Calif.; Bart Hagemeyer, meteorologist in charge, NOAA National Weather Service forecast office, Melbourne, Fla.; and Joel Tumbiolo, Delta IV launch weather officer, 45th Weather Squadron, Cape Canaveral Air Force Station. The GOES-O satellite is targeted to launch June 26. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. Each of the GOES satellites continuously provides observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. Photo credit: NASA/Jim Grossmann

  18. An Overview of the NASA Sounding Rockets and Balloon Programs

    NASA Technical Reports Server (NTRS)

    Flowers, Bobby J.; Needleman, Harvey C.

    1999-01-01

    The U.S. National Aeronautics and Space Administration (NASA) Sounding Rockets and Balloon Programs conduct a combined total of approximately fifty to sixty missions per year in support of the NASA scientific community. These missions are provided in support of investigations sponsored by NASA'S Offices of Space Science, Life and Microgravity Sciences & Applications, and Earth Science. The Goddard Space Flight Center has management and implementation responsibility for these programs. The NASA Sounding Rockets Program has continued to su,pport the science community by integrating their experiments into the sounding rocket payload and providing the rocket vehicle and launch operations necessary to provide the altitude/time required obtain the science objectives. The sounding rockets continue to provide a cost-effective way to make in situ observations from 50 to 1500 km in the near-earth environment and to uniquely cover the altitude regime between 50 km and 130 km above the Earth's surface, which is physically inaccessible to either balloons or satellites. A new architecture for providing this support has been introduced this year with the establishment of the NASA Sounding Rockets Contract. The Program has continued to introduce improvements into their operations and ground and flight systems. An overview of the NASA Sounding Rockets Program with special emphasis on the new support contract will be presented. The NASA Balloon Program continues to make advancements and developments in its capabilities for support of the scientific ballooning community. Long duration balloon (LDB) is a prominent aspect of the program with two campaigns scheduled for this calendar year. Two flights are scheduled in the Northern Hemisphere from Fairbanks, Alaska, in June and two flights are scheduled from McMurdo, Antarctica, in the Southern Hemisphere in December. The comprehensive balloon research and development (R&D) effort has continued with advances being made across the spectrum of balloon related disciplines. As a result of these technology advancements a new ultra long duration balloon project (ULDB) for the development of a 100- day duration balloon capability has been initiated. The ULDB will rely upon new balloon materials and designs to accomplish its goals. The Program has also continued to introduce new technology and improvements into flights systems, ground systems and operational techniques. An overview of the various aspects of the NASA Balloon Program will be presented.

  19. International Space Station Environmental Control and Life Support System Status: 2006 - 2007

    NASA Technical Reports Server (NTRS)

    Williams, David E.; Gentry, Gregory J.

    2007-01-01

    The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between March 2006 and February 2007. The ISS continued permanent crew operations, with the start of Phase 3 of the ISS Assembly Sequence. Work continued on the Phase 3 pressurized elements and the continued manufacturing and testing of the regenerative ECLS equipment.

  20. International Space Station Environmental Control and Life Support System Status: 2005 - 2006

    NASA Technical Reports Server (NTRS)

    Williams, David E.; Gentry, Gregory J.

    2006-01-01

    The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between March 2005 and February 2006. The ISS continued permanent crew operations, with the start of Phase 3 of the ISS Assembly Sequence. Work continued on the Phase 3 pressurized elements and the continued manufacturing and testing of the regenerative ECLS equipment.

  1. International Space Station (ISS) Environmental Control and Life Support System Status: 2003-2004

    NASA Technical Reports Server (NTRS)

    Williams, David E.; Gentry, Gregory

    2004-01-01

    The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between April 2003 and March 2004. The ISS continued permanent crew operations, with the start of Phase 3 of the ISS Assembly Sequence. Work continued on the Phase 3 pressurized elements and the continued manufacturing and testing of the regenerative ECLS equipment.

  2. International Space Station Environmental Control and Life Support System Status: 2014-2015

    NASA Technical Reports Server (NTRS)

    Williams, David E.; Gentry, Gregory J.

    2015-01-01

    The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year and the impacts of the international partners' activities on them, covering the period of time between March 2014 and February 2015. The ISS continued permanent crew operations including the continuation of six crew members being on ISS. Work continues on the commercial crew vehicles, and work to try and extend ISS service life.

  3. Future Supply Chains Enabled by Continuous Processing-Opportunities Challenges May 20-21 2014 Continuous Manufacturing Symposium.

    PubMed

    Srai, Jagjit Singh; Badman, Clive; Krumme, Markus; Futran, Mauricio; Johnston, Craig

    2015-03-01

    This paper examines the opportunities and challenges facing the pharmaceutical industry in moving to a primarily "continuous processing"-based supply chain. The current predominantly "large batch" and centralized manufacturing system designed for the "blockbuster" drug has driven a slow-paced, inventory heavy operating model that is increasingly regarded as inflexible and unsustainable. Indeed, new markets and the rapidly evolving technology landscape will drive more product variety, shorter product life-cycles, and smaller drug volumes, which will exacerbate an already unsustainable economic model. Future supply chains will be required to enhance affordability and availability for patients and healthcare providers alike despite the increased product complexity. In this more challenging supply scenario, we examine the potential for a more pull driven, near real-time demand-based supply chain, utilizing continuous processing where appropriate as a key element of a more "flow-through" operating model. In this discussion paper on future supply chain models underpinned by developments in the continuous manufacture of pharmaceuticals, we have set out; The paper recognizes that although current batch operational performance in pharma is far from optimal and not necessarily an appropriate end-state benchmark for batch technology, the adoption of continuous supply chain operating models underpinned by continuous production processing, as full or hybrid solutions in selected product supply chains, can support industry transformations to deliver right-first-time quality at substantially lower inventory profiles. © 2015 The Authors. Journal of Pharmaceutical Sciences published by Wiley Periodicals, Inc. and the American Pharmacists Association. © 2014 Wiley Periodicals, Inc. and the American Pharmacists Association.

  4. NASA's UAS [Unmanned Aircraft Systems] Related Activities

    NASA Technical Reports Server (NTRS)

    Bauer, Jeffrey

    2012-01-01

    NASA continues to operate all sizes of UAS in all classes of airspace both domestically and internationally. Missions range from highly complex operations in coordination with piloted aircraft, ground, and space systems in support of science objectives to single aircraft operations in support of aeronautics research. One such example is a scaled commercial transport aircraft being used to study recovery techniques due to large upsets. NASA's efforts to support routine UAS operations continued on several fronts last year. At the national level in the United States (U.S.), NASA continued its support of the UAS Executive Committee (ExCom) comprised of the Federal Aviation Administration (FAA), Department of Defense (DoD), Department of Homeland Security (DHS), and NASA. The committee was formed in recognition of the need of UAS operated by these agencies to access to the National Airspace System (NAS) to support operational, training, development and research requirements. Recommendations were received on how to operate both manned and unmanned aircraft in class D airspace and plans are being developed to validate and implement those recommendations. In addition the UAS ExCom has begun developing recommendations for how to achieve routine operations in remote areas as well as for small UAS operations in class G airspace. As well as supporting the UAS ExCom, NASA is a participant in the recently formed Aviation Rule Making Committee for UAS. This committee, established by the FAA, is intended to propose regulatory guidance which would enable routine civil UAS operations. As that effort matures NASA stands ready to supply the necessary technical expertise to help that committee achieve its objectives. By supporting both the UAS ExCom and UAS ARC, NASA is positioned to provide its technical expertise across the full spectrum of UAS airspace access related topic areas. The UAS NAS Access Project got underway this past year under the leadership of NASA s Aeronautics Research Mission Directorate. This project is focused on advancing the state of the art and providing research and analysis results in the areas of Separation Assurance, Communications (non-governmental spectrum allocation for UAS), Certification, and Human System Integration (ground control station design/pilot interfaces). The project is working in close coordination with the FAA and industry standards organizations (e.g. RTCA SC 203). More details on this project are provided in a separate article in this year's yearbook

  5. 40 CFR 792.113 - Mixtures of substances with carriers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... according to written standard operating procedures, which provide for periodic analysis of each batch. (b... SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference Substances...

  6. 40 CFR 792.113 - Mixtures of substances with carriers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... according to written standard operating procedures, which provide for periodic analysis of each batch. (b... SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference Substances...

  7. 40 CFR 792.113 - Mixtures of substances with carriers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... according to written standard operating procedures, which provide for periodic analysis of each batch. (b... SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference Substances...

  8. 40 CFR 792.113 - Mixtures of substances with carriers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... according to written standard operating procedures, which provide for periodic analysis of each batch. (b... SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference Substances...

  9. Generalised summation-by-parts operators and variable coefficients

    NASA Astrophysics Data System (ADS)

    Ranocha, Hendrik

    2018-06-01

    High-order methods for conservation laws can be highly efficient if their stability is ensured. A suitable means mimicking estimates of the continuous level is provided by summation-by-parts (SBP) operators and the weak enforcement of boundary conditions. Recently, there has been an increasing interest in generalised SBP operators both in the finite difference and the discontinuous Galerkin spectral element framework. However, if generalised SBP operators are used, the treatment of the boundaries becomes more difficult since some properties of the continuous level are no longer mimicked discretely - interpolating the product of two functions will in general result in a value different from the product of the interpolations. Thus, desired properties such as conservation and stability are more difficult to obtain. Here, new formulations are proposed, allowing the creation of discretisations using general SBP operators that are both conservative and stable. Thus, several shortcomings that might be attributed to generalised SBP operators are overcome (cf. Nordström and Ruggiu (2017) [38] and Manzanero et al. (2017) [39]).

  10. 47 CFR 76.501 - Cross-ownership.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND..., cable system, SMATV or multiple video distribution provider subject to § 76.501, § 76.505, or § 76.905(b... station, cable system, SMATV, or multiple video distribution provider that operates in the same market, is...

  11. 47 CFR 76.501 - Cross-ownership.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND..., cable system, SMATV or multiple video distribution provider subject to § 76.501, § 76.505, or § 76.905(b... station, cable system, SMATV, or multiple video distribution provider that operates in the same market, is...

  12. 47 CFR 76.501 - Cross-ownership.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND..., cable system, SMATV or multiple video distribution provider subject to § 76.501, § 76.505, or § 76.905(b... station, cable system, SMATV, or multiple video distribution provider that operates in the same market, is...

  13. The Automation-by-Expertise-by-Training Interaction.

    PubMed

    Strauch, Barry

    2017-03-01

    I introduce the automation-by-expertise-by-training interaction in automated systems and discuss its influence on operator performance. Transportation accidents that, across a 30-year interval demonstrated identical automation-related operator errors, suggest a need to reexamine traditional views of automation. I review accident investigation reports, regulator studies, and literature on human computer interaction, expertise, and training and discuss how failing to attend to the interaction of automation, expertise level, and training has enabled operators to commit identical automation-related errors. Automated systems continue to provide capabilities exceeding operators' need for effective system operation and provide interfaces that can hinder, rather than enhance, operator automation-related situation awareness. Because of limitations in time and resources, training programs do not provide operators the expertise needed to effectively operate these automated systems, requiring them to obtain the expertise ad hoc during system operations. As a result, many do not acquire necessary automation-related system expertise. Integrating automation with expected operator expertise levels, and within training programs that provide operators the necessary automation expertise, can reduce opportunities for automation-related operator errors. Research to address the automation-by-expertise-by-training interaction is needed. However, such research must meet challenges inherent to examining realistic sociotechnical system automation features with representative samples of operators, perhaps by using observational and ethnographic research. Research in this domain should improve the integration of design and training and, it is hoped, enhance operator performance.

  14. Optimal Trajectories and Control Strategies for the Helicopter in One-Engine-Inoperative Terminal-Area Operations

    NASA Technical Reports Server (NTRS)

    Chen, Robert T. N.; Zhao, Yi-Yuan; Aiken, Edwin W. (Technical Monitor)

    1995-01-01

    Engine failure represents a major safety concern to helicopter operations, especially in the critical flight phases of takeoff and landing from/to small, confined areas. As a result, the JAA and FAA both certificate a transport helicopter as either Category-A or Category-B according to the ability to continue its operations following engine failures. A Category-B helicopter must be able to land safely in the event of one or all engine failures. There is no requirement, however, for continued flight capability. In contrast, Category-A certification, which applies to multi-engine transport helicopters with independent engine systems, requires that they continue the flight with one engine inoperative (OEI). These stringent requirements, while permitting its operations from rooftops and oil rigs and flight to areas where no emergency landing sites are available, restrict the payload of a Category-A transport helicopter to a value safe for continued flight as well as for landing with one engine inoperative. The current certification process involves extensive flight tests, which are potentially dangerous, costly, and time consuming. These tests require the pilot to simulate engine failures at increasingly critical conditions, Flight manuals based on these tests tend to provide very conservative recommendations with regard to maximum takeoff weight or required runway length. There are very few theoretical studies on this subject to identify the fundamental parameters and tradeoff factors involved. Furthermore, a capability for real-time generation of OEI optimal trajectories is very desirable for providing timely cockpit display guidance to assist the pilot in reducing his workload and to increase safety in a consistent and reliable manner. A joint research program involving NASA Ames Research Center, the FAA, and the University of Minnesota is being conducted to determine OEI optimal control strategies and the associated optimal,trajectories for continued takeoff (CTO), rejected takeoff (RTO), balked landing (BL), and continued landing (CL) for a twin engine helicopter in both VTOL and STOL terminal-area operations. This proposed paper will present the problem formulation, the optimal control solution methods, and the key results of the trajectory optimization studies for both STOL and VTOL OEI operations. In addition, new results concerning the recently developed methodology, which enable a real-time generation of optimal OEI trajectories, will be presented in the paper. This new real-time capability was developed to support the second piloted simulator investigation on cockpit displays for Category-A operations being scheduled for the NASA Ames Vertical Motion Simulator in June-August of 1995. The first VMS simulation was conducted in 1994 and reported.

  15. Induced bioelectrochemical metabolism for bioremediation of petroleum refinery wastewater: Optimization of applied potential and flow of wastewater.

    PubMed

    Mohanakrishna, Gunda; Al-Raoush, Riyadh I; Abu-Reesh, Ibrahim M

    2018-07-01

    Hybrid based bioelectrochemical system (BES) configured with embedded anode and cathode electrodes in soil was tested for the bioelectrochemical degradation of petroleum refinery wastewater (PRW). Four applied potentials were studied to optimize under batch mode operation, among which 2 V resulted in higher COD degradation (69.2%) and power density (725 mW/m 2 ) during 7 days of operation. Further studies with continuous mode of operation at optimized potential (2 V) showed that hydraulic retention time (HRT) of 19 h achieved the highest COD removal (37%) and highest power density (561 mW/m 2 ). BES function with respect to treatment efficiencies of other pollutants of PRW was also identified with respect to oil and grease (batch mode, 91%; continuous mode, 34%), total dissolved salts (batch mode, 53%; continuous mode, 24%) and sulfates (batch mode, 59%; continuous mode, 42%). Soil microenvironment in association with BES forms complex processes, providing suitable conditions for efficient treatment of PRW. Copyright © 2018 Elsevier Ltd. All rights reserved.

  16. The International GPS Service (IGS) as a Continuous Reference System for Precise GPS Positioning

    NASA Technical Reports Server (NTRS)

    Neilan, Ruth; Heflin, Michael; Watkins, Michael; Zumberge, James

    1996-01-01

    The International GPS Service for Geodynamics (IGS) is an organization which operates under the auspices of the International Association of Geodesy (IAG) and has been operational since January 1994. The primary objective of the IGS is to provide precise GPS data and data products to support geodetic and geophysical research activities.

  17. Lunar impact: A history of Project Ranger

    NASA Technical Reports Server (NTRS)

    Hall, R. C.

    1977-01-01

    Complete history of the Ranger project is provided as a tool for understanding the evolution and operational form of NASA's continuing progress of unmanned space exploration. Basic management techniques, flight operating procedures and technology for NASA's later unmanned lunar and planetary missions were reviewed. Methods for selecting experiments and integrating them with the spacecraft were also investigated.

  18. U.S. Department of Education, Office of Inspector General Semiannual Report to Congress, April 1-September 30, 2000.

    ERIC Educational Resources Information Center

    Office of Inspector General (ED), Washington, DC.

    This report from the Office of Inspector General (OIG) identifies systemic weaknesses in the operations and programs of the U.S. Department of Education (ED). The office provides accurate financial information to make informed decisions, manage for results, and ensure operation integrity. Vigorous fraud investigations are continuing. Audits reveal…

  19. 76 FR 4993 - Agency Information Collection; Activity Under OMB Review; Report of Financial and Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    .... Carrier Fitness Fitness determinations are made for both new entrants and established U.S. domestic... continuing fitness to operate. Section 41738 of Title 49 of the United States Code requires DOT to find all... prerequisite to providing such service to an eligible essential air service point. In making a fitness...

  20. Recommendations on the Use of Diagnostic Devices in Far-Forward Military Operations

    DTIC Science & Technology

    2016-10-01

    any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense , Washington Headquarters... Department of Defense (DoD). A consistent theme that emerged during the workshop was that even if technology that could provide detailed patient care...of military operations in which the Department of Defense (DoD) operates. DoD members achieve continuity of care and treatment by moving patients

  1. An update on EUMETSAT programmes and plans

    NASA Astrophysics Data System (ADS)

    Klaes, K. Dieter; Holmlund, Kenneth

    2016-09-01

    EUMETSAT is providing space based observations for operational meteorology and climate monitoring. The observations are measured by geostationary and sun-synchronous polar orbiting satellites in the frame of mandatory programmes. In the frame of optional programmes further observations for altimetry and oceanography are collected and disseminated. In the frame of third party programmes, EUMETSAT makes available data from other agencies' satellites to the user community. Since summer 2015 MSG-4 complements the current operational fleet of operational geostationary spacecraft, Meteosat-7, which is the last satellite of the first generation and the three satellites of the Second Generation of Meteosat, Meteosat-8, Meteosat-9 and Meteosat-10. MSG-4 became Meteosat-11 and was stored in orbit after successful commissioning. Two satellites of the EUMETSAT Polar System (EPS) provide data from sunsynchronous polar orbit. Metop-B, the second of a series of three satellites, launched in September 2012 and Metop-A, the first of the series, in orbit since October 2006 provide operational services. The satellites belong to the Initial Joint Polar System (IJPS) with the US. EUMETSAT's first optional programme continues to provide data from the Jason-2 satellite since summer 2008. As follow on the Jason-3 satellite was launched in January 2016 and is currently in commissioning. To assure continuity development of Meteosat Third Generation (MTG) is ongoing. The EPS-SG programme was fully approved in summer 2015. In the frame of the Copernicus Programme (formerly GMES (Global Monitoring for Environment and Security)) EUMETSAT will operate the marine part of the Sentinel-3 satellite. It was launched in February 2016 and is currently under commissioning.

  2. A Hierarchical structure of key performance indicators for operation management and continuous improvement in production systems

    PubMed Central

    Kang, Ningxuan; Zhao, Cong; Li, Jingshan; Horst, John A.

    2018-01-01

    Key performance indicators (KPIs) are critical for manufacturing operation management and continuous improvement (CI). In modern manufacturing systems, KPIs are defined as a set of metrics to reflect operation performance, such as efficiency, throughput, availability, from productivity, quality and maintenance perspectives. Through continuous monitoring and measurement of KPIs, meaningful quantification and identification of different aspects of operation activities can be obtained, which enable and direct CI efforts. A set of 34 KPIs has been introduced in ISO 22400. However, the KPIs in a manufacturing system are not independent, and they may have intrinsic mutual relationships. The goal of this paper is to introduce a multi-level structure for identification and analysis of KPIs and their intrinsic relationships in production systems. Specifically, through such a hierarchical structure, we define and layer KPIs into levels of basic KPIs, comprehensive KPIs and their supporting metrics, and use it to investigate the relationships and dependencies between KPIs. Such a study can provide a useful tool for manufacturing engineers and managers to measure and utilize KPIs for CI. PMID:29398722

  3. A Hierarchical structure of key performance indicators for operation management and continuous improvement in production systems.

    PubMed

    Kang, Ningxuan; Zhao, Cong; Li, Jingshan; Horst, John A

    2016-01-01

    Key performance indicators (KPIs) are critical for manufacturing operation management and continuous improvement (CI). In modern manufacturing systems, KPIs are defined as a set of metrics to reflect operation performance, such as efficiency, throughput, availability, from productivity, quality and maintenance perspectives. Through continuous monitoring and measurement of KPIs, meaningful quantification and identification of different aspects of operation activities can be obtained, which enable and direct CI efforts. A set of 34 KPIs has been introduced in ISO 22400. However, the KPIs in a manufacturing system are not independent, and they may have intrinsic mutual relationships. The goal of this paper is to introduce a multi-level structure for identification and analysis of KPIs and their intrinsic relationships in production systems. Specifically, through such a hierarchical structure, we define and layer KPIs into levels of basic KPIs, comprehensive KPIs and their supporting metrics, and use it to investigate the relationships and dependencies between KPIs. Such a study can provide a useful tool for manufacturing engineers and managers to measure and utilize KPIs for CI.

  4. 50 CFR 18.24 - Taking incidental to commercial fishing operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... THE INTERIOR (CONTINUED) TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER, EXPORTATION, AND... until October 21, 1974: Provided, That such taking is by means of equipment and techniques prescribed in...

  5. Post-event reviews: Using a quantitative approach for analysing incident response to demonstrate the value of business continuity programmes and increase planning efficiency.

    PubMed

    Vaidyanathan, Karthik

    2017-01-01

    Business continuity management is often thought of as a proactive planning process for minimising impact from large-scale incidents and disasters. While this is true, and it is critical to plan for the worst, consistently validating plan effectiveness against smaller disruptions can enable an organisation to gain key insights about its business continuity readiness, drive programme improvements, reduce costs and provide an opportunity to quantitatively demonstrate the value of the programme to management. This paper describes a post mortem framework which is used as a continuous improvement mechanism for tracking, reviewing and learning from real-world events at Microsoft Customer Service & Support. This approach was developed and adopted because conducting regular business continuity exercises proved difficult and expensive in a complex and distributed operations environment with high availability requirements. Using a quantitative approach to measure response to incidents, and categorising outcomes based on such responses, enables business continuity teams to provide data-driven insights to leadership, change perceptions of incident root cause, and instil a higher level of confidence towards disaster response readiness and incident management. The scope of the framework discussed here is specific to reviewing and driving improvements from operational incidents. However, the concept can be extended to learning and evolving readiness plans for other types of incidents.

  6. An overview and the latest status of the Landsat Data Continuity Mission (LDCM)

    NASA Astrophysics Data System (ADS)

    Sabelhaus, Phil

    2011-10-01

    The Landsat Data Continuity Mission (LDCM) will provide continuity in the multi-decadal land use/land cover change measurements of the Landsat Program for scientific research. The project office at the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) is responsible for the development, launch and post launch activation and check out for the Landsat Data Continuity Mission. The LDCM project is currently in its development phase with launch scheduled for December 2012 on an Atlas V launch vehicle provided by the Kennedy Space Center (KSC) from the Vandenberg Air Force Base (VAFB). The project is a partnership between NASA and the Department of the Interior (DOI)/United States Geological Survey (USGS). DOI/USGS is responsible for development of the ground system and will assume responsibility for satellite and ground system operations following the check-out period. This paper will provide an overview and the latest status of the LDCM mission.

  7. On providing the fault-tolerant operation of information systems based on open content management systems

    NASA Astrophysics Data System (ADS)

    Kratov, Sergey

    2018-01-01

    Modern information systems designed to service a wide range of users, regardless of their subject area, are increasingly based on Web technologies and are available to users via Internet. The article discusses the issues of providing the fault-tolerant operation of such information systems, based on free and open source content management systems. The toolkit available to administrators of similar systems is shown; the scenarios for using these tools are described. Options for organizing backups and restoring the operability of systems after failures are suggested. Application of the proposed methods and approaches allows providing continuous monitoring of the state of systems, timely response to the emergence of possible problems and their prompt solution.

  8. The role of the United States Army active component pediatricians in Operations Desert Shield, Desert Storm, and provide comfort.

    PubMed

    Pierce, J R

    1993-02-01

    The professional activities and experiences of Army active component pediatricians deployed to Southwest Asia in support of Operations Desert Shield, Desert Storm, and Provide Comfort are reported. The 37 pediatricians who served in Southwest Asia were surveyed by a voluntary questionnaire. The survey revealed that Army pediatricians played an important role in these operations and in supporting the combat forces in Southwest Asia. They also played a critical role in caring for children displaced by the war and its aftermath in southern and northern Iraq. Pediatricians played an equally important role in continuing to provide care and support for the family members left behind in the United States and Europe.

  9. 40 CFR 63.10021 - How do I demonstrate continuous compliance with the emission limitations, operating limits, and...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... need only provide a single pre- and post-tune-up value rather than continual values before and after...) Within 45 days of the exceedance or at the time of the annual compliance test, whichever comes first, conduct a PM emissions compliance test to determine compliance with the PM emissions limit and to verify...

  10. 40 CFR 63.10021 - How do I demonstrate continuous compliance with the emission limitations, operating limits, and...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... need only provide a single pre- and post-tune-up value rather than continual values before and after...) Within 45 days of the exceedance or at the time of the annual compliance test, whichever comes first, conduct a PM emissions compliance test to determine compliance with the PM emissions limit and to verify...

  11. The changing role of the medical technologist from technologist to information specialist.

    PubMed

    Miller, W G

    2000-01-01

    Pathology laboratory services are dependent on the laboratory information system (LIS) to organize the work, manage the operation, and communicate the results for effective laboratory medicine. For maximum efficiency, staffing for the LIS should be an integral component of laboratory operations and is facilitated by a two-tier structure. A core LIS staff provides system support and continuous services. A group of bench medical technologists have multitasking responsibilities, including LIS support for a specific laboratory work area. The two components form a team that uses staff efficiently to provide ongoing operational services and flexibility for problem solving and new functionality implementation.

  12. Toward continuous-wave operation of organic semiconductor lasers

    PubMed Central

    Sandanayaka, Atula S. D.; Matsushima, Toshinori; Bencheikh, Fatima; Yoshida, Kou; Inoue, Munetomo; Fujihara, Takashi; Goushi, Kenichi; Ribierre, Jean-Charles; Adachi, Chihaya

    2017-01-01

    The demonstration of continuous-wave lasing from organic semiconductor films is highly desirable for practical applications in the areas of spectroscopy, data communication, and sensing, but it still remains a challenging objective. We report low-threshold surface-emitting organic distributed feedback lasers operating in the quasi–continuous-wave regime at 80 MHz as well as under long-pulse photoexcitation of 30 ms. This outstanding performance was achieved using an organic semiconductor thin film with high optical gain, high photoluminescence quantum yield, and no triplet absorption losses at the lasing wavelength combined with a mixed-order distributed feedback grating to achieve a low lasing threshold. A simple encapsulation technique greatly reduced the laser-induced thermal degradation and suppressed the ablation of the gain medium otherwise taking place under intense continuous-wave photoexcitation. Overall, this study provides evidence that the development of a continuous-wave organic semiconductor laser technology is possible via the engineering of the gain medium and the device architecture. PMID:28508042

  13. Toward continuous-wave operation of organic semiconductor lasers.

    PubMed

    Sandanayaka, Atula S D; Matsushima, Toshinori; Bencheikh, Fatima; Yoshida, Kou; Inoue, Munetomo; Fujihara, Takashi; Goushi, Kenichi; Ribierre, Jean-Charles; Adachi, Chihaya

    2017-04-01

    The demonstration of continuous-wave lasing from organic semiconductor films is highly desirable for practical applications in the areas of spectroscopy, data communication, and sensing, but it still remains a challenging objective. We report low-threshold surface-emitting organic distributed feedback lasers operating in the quasi-continuous-wave regime at 80 MHz as well as under long-pulse photoexcitation of 30 ms. This outstanding performance was achieved using an organic semiconductor thin film with high optical gain, high photoluminescence quantum yield, and no triplet absorption losses at the lasing wavelength combined with a mixed-order distributed feedback grating to achieve a low lasing threshold. A simple encapsulation technique greatly reduced the laser-induced thermal degradation and suppressed the ablation of the gain medium otherwise taking place under intense continuous-wave photoexcitation. Overall, this study provides evidence that the development of a continuous-wave organic semiconductor laser technology is possible via the engineering of the gain medium and the device architecture.

  14. Design of launch systems using continuous improvement process

    NASA Technical Reports Server (NTRS)

    Brown, Richard W.

    1995-01-01

    The purpose of this paper is to identify a systematic process for improving ground operations for future launch systems. This approach is based on the Total Quality Management (TQM) continuous improvement process. While the continuous improvement process is normally identified with making incremental changes to an existing system, it can be used on new systems if they use past experience as a knowledge base. In the case of the Reusable Launch Vehicle (RLV), the Space Shuttle operations provide many lessons. The TQM methodology used for this paper will be borrowed from the United States Air Force 'Quality Air Force' Program. There is a general overview of the continuous improvement process, with concentration on the formulation phase. During this phase critical analyses are conducted to determine the strategy and goals for the remaining development process. These analyses include analyzing the mission from the customers point of view, developing an operations concept for the future, assessing current capabilities and determining the gap to be closed between current capabilities and future needs and requirements. A brief analyses of the RLV, relative to the Space Shuttle, will be used to illustrate the concept. Using the continuous improvement design concept has many advantages. These include a customer oriented process which will develop a more marketable product and a better integration of operations and systems during the design phase. But, the use of TQM techniques will require changes, including more discipline in the design process and more emphasis on data gathering for operational systems. The benefits will far outweigh the additional effort.

  15. 29 CFR Appendix A to Subpart M of... - Determining Roof Widths

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Fall Protection Pt. 1926... monitoring system alone as a means of providing fall protection during the performance of roofing operations...

  16. 29 CFR Appendix A to Subpart M of... - Determining Roof Widths

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Fall Protection Pt. 1926... monitoring system alone as a means of providing fall protection during the performance of roofing operations...

  17. 29 CFR Appendix A to Subpart M of... - Determining Roof Widths

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Fall Protection Pt. 1926... monitoring system alone as a means of providing fall protection during the performance of roofing operations...

  18. 29 CFR Appendix A to Subpart M of... - Determining Roof Widths

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Fall Protection Pt. 1926... monitoring system alone as a means of providing fall protection during the performance of roofing operations...

  19. 29 CFR Appendix A to Subpart M of... - Determining Roof Widths

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Fall Protection Pt. 1926... monitoring system alone as a means of providing fall protection during the performance of roofing operations...

  20. 47 CFR 95.1107 - Authorized locations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PERSONAL RADIO... care facility provided the facility is located anywhere a CB station operation is permitted under § 95... associated with a health care facility. ...

  1. 7 CFR 2700.3 - Functions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... management of information resources and the operational effectiveness of the Department; provides... Regulations of the Department of Agriculture (Continued) OFFICE OF INFORMATION RESOURCES MANAGEMENT... direction for OIRM. Develops and recommends Departmental information resources management principles...

  2. Continuously-stirred anaerobic digester to convert organic wastes into biogas: system setup and basic operation.

    PubMed

    Usack, Joseph G; Spirito, Catherine M; Angenent, Largus T

    2012-07-13

    Anaerobic digestion (AD) is a bioprocess that is commonly used to convert complex organic wastes into a useful biogas with methane as the energy carrier. Increasingly, AD is being used in industrial, agricultural, and municipal waste(water) treatment applications. The use of AD technology allows plant operators to reduce waste disposal costs and offset energy utility expenses. In addition to treating organic wastes, energy crops are being converted into the energy carrier methane. As the application of AD technology broadens for the treatment of new substrates and co-substrate mixtures, so does the demand for a reliable testing methodology at the pilot- and laboratory-scale. Anaerobic digestion systems have a variety of configurations, including the continuously stirred tank reactor (CSTR), plug flow (PF), and anaerobic sequencing batch reactor (ASBR) configurations. The CSTR is frequently used in research due to its simplicity in design and operation, but also for its advantages in experimentation. Compared to other configurations, the CSTR provides greater uniformity of system parameters, such as temperature, mixing, chemical concentration, and substrate concentration. Ultimately, when designing a full-scale reactor, the optimum reactor configuration will depend on the character of a given substrate among many other nontechnical considerations. However, all configurations share fundamental design features and operating parameters that render the CSTR appropriate for most preliminary assessments. If researchers and engineers use an influent stream with relatively high concentrations of solids, then lab-scale bioreactor configurations cannot be fed continuously due to plugging problems of lab-scale pumps with solids or settling of solids in tubing. For that scenario with continuous mixing requirements, lab-scale bioreactors are fed periodically and we refer to such configurations as continuously stirred anaerobic digesters (CSADs). This article presents a general methodology for constructing, inoculating, operating, and monitoring a CSAD system for the purpose of testing the suitability of a given organic substrate for long-term anaerobic digestion. The construction section of this article will cover building the lab-scale reactor system. The inoculation section will explain how to create an anaerobic environment suitable for seeding with an active methanogenic inoculum. The operating section will cover operation, maintenance, and troubleshooting. The monitoring section will introduce testing protocols using standard analyses. The use of these measures is necessary for reliable experimental assessments of substrate suitability for AD. This protocol should provide greater protection against a common mistake made in AD studies, which is to conclude that reactor failure was caused by the substrate in use, when really it was improper user operation.

  3. Recommended techniques for effective maintainability. A continuous improvement initiative of the NASA Reliability and Maintainability Steering Committee

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This manual presents a series of recommended techniques that can increase overall operational effectiveness of both flight and ground based NASA systems. It provides a set of tools that minimizes risk associated with: (1) restoring failed functions (both ground and flight based); (2) conducting complex and highly visible maintenance operations; and (3) sustaining a technical capability to support the NASA mission using aging equipment or facilities. It considers (1) program management - key elements of an effective maintainability effort; (2) design and development - techniques that have benefited previous programs; (3) analysis and test - quantitative and qualitative analysis processes and testing techniques; and (4) operations and operational design techniques that address NASA field experience. This document is a valuable resource for continuous improvement ideas in executing the systems development process in accordance with the NASA 'better, faster, smaller, and cheaper' goal without compromising safety.

  4. Apparatus and method for use in storing energy

    DOEpatents

    Sathrum, Aaron J.

    2017-08-01

    Some embodiments provide energy storage systems that comprise: a first electrode; a second electrode; an electrolyte; the first electrode, the second electrode and the electrolyte are positioned such that the electrolyte is in contact with at least the first electrode; and a polarity reversal system electrically coupled with the first electrode and the second electrode, wherein the polarity reversal system is configured to allow the energy storage system to operate while a first polarity to charge and discharge electrical energy while operating in the first polarity, and the polarity reversal system is configured to reverse the voltage polarity across the first and second electrodes to a second polarity to allow the energy storage system to continue to operate while the second polarity is established across the first electrode and the second electrode to continue to charge and discharge electrical energy while operating in the second polarity.

  5. Tropical Rainfall Measurement Mission (TRMM) Operation Summary

    NASA Technical Reports Server (NTRS)

    Nio, Tomomi; Saito, Susumu; Stocker, Erich; Pawloski, James H.; Murayama, Yoshifumi; Ohata, Takeshi

    2015-01-01

    The Tropical Rainfall Measurement Mission (TRMM) is a joint U.S. and Japan mission to observe tropical rainfall, which was launched by H-II No. 6 from Tanegashima in Japan at 6:27 JST on November 28, 1997. After the two-month commissioning of TRMM satellite and instruments, the original nominal mission lifetime was three years. In fact, the operations has continued for approximately 17.5 years. This paper provides a summary of the long term operations of TRMM.

  6. Mission Performance of the GLAS Thermal Control System - 7 Years In Orbit

    NASA Technical Reports Server (NTRS)

    Grob, Eric W.

    2010-01-01

    ICESat (Ice, Cloud and land Elevation Satellite) was launched in 2003 carrying a single science instrument - the Geoscience Laser Altimeter System (GLAS). Its primary mission was to measure polar ice thickness. The GLAS thermal control architecture utilized propylene Loop Heat Pipe (LHP) technology to provide selectable and stable temperature control for the lasers and other electronics over a widely varying mission thermal environment. To minimize expected degradation of the radiators, Optical Solar Reflectors (OSRs) were used for both LHP radiators to minimize degradation caused by UV exposure in the various spacecraft attitudes necessary throughout the mission. Developed as a Class C mission, with selective redundancy, the thermal architecture was single st ring, except for temperature sensors used for heater control during normal operations. Although originally planned for continuous laser operations over the nominal three year science mission, laser anomalies limited operations to discrete measurement campaigns repeated throughout the year. For trending of the science data, these periods were selected to occur at approximately the same time each year, which resulted in operations during similar attitudes and beta angles. Despite the laser life issues, the LHPs have operated nearly continuously over this time, being non-operational for only brief periods. Using mission telemetry, this paper looks at the performance of the thermal subsystem during these periods and provides an assessment of radiator degradation over the mission lifetime.

  7. CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb

    2001-01-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates have been completed and issued for review. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter. Initial pilot facility shakedown was completed during the fourth quarter. During pilot plant shakedown operations, several production batch test runs were performed. These pilot tests were coupled with laboratory testing to confirm pilot results. In initial batches of operations, cellulose to glucose conversionsmore » of 62.5% and 64.8% were observed in laboratory hydrolysis. As part of this testing, lignin dewatering was tested using laboratory and vendor-supplied filtration equipment. Dewatering tests reported moisture contents in the lignin of between 50% and 60%. Dewatering parameters and options will continue to be investigated during lignin production. After some unavoidable delays, a suitable representative supply of MSW feed material was procured. Shredding of the feed material was completed and final drying of the feed is expected to be completed by late January. Once feed drying is completed, pilot facility production will begin to produce lignin for co-fire testing. Facility modifications are expected to continue to improve facility operations and performance during the first quarter of 2001. The TVA-Colbert facility continues to make progress in evaluating the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system continues.« less

  8. Flight Hardware Fabricated for Combustion Science in Space

    NASA Technical Reports Server (NTRS)

    OMalley, Terence F.; Weiland, Karen J.

    2005-01-01

    NASA Glenn Research Center s Telescience Support Center (TSC) allows researchers on Earth to operate experiments onboard the International Space Station (ISS) and the space shuttles. NASA s continuing investment in the required software, systems, and networks provides distributed ISS ground operations that enable payload developers and scientists to monitor and control their experiments from the Glenn TSC. The quality of scientific and engineering data is enhanced while the long-term operational costs of experiments are reduced because principal investigators and engineering teams can operate their payloads from their home institutions.

  9. Method for lubricating contacting surfaces

    DOEpatents

    Dugger, Michael T [Tijeras, NM; Ohlhausen, James A [Albuquerque, NM; Asay, David B [Boalsburg, PA; Kim, Seong H [State College, PA

    2011-12-06

    A method is provided for tribological lubrication of sliding contact surfaces, where two surfaces are in contact and in motion relative to each other, operating in a vapor-phase environment containing at least one alcohol compound at a concentration sufficiently high to provide one monolayer of coverage on at least one of the surfaces, where the alcohol compound continuously reacts at the surface to provide lubrication.

  10. International Space Station Environmental Control and Life Support System Status: 2011-2012

    NASA Technical Reports Server (NTRS)

    Williams, David E.; Dake, Jason R.; Gentry, Gregory J.

    2011-01-01

    The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year and the impacts of the international partners activities on them, covering the period of time between March 2011 and February 2012. The ISS continued permanent crew operations including the continuation of six crew members being on ISS. Work continues on the commercial cargo resupply vehicles, and work to try and extend ISS service life from 2015 to no later than 2028. 1

  11. International Space Station Environmental Control and Life Support System Status for the Prior Year: 2011 - 2012

    NASA Technical Reports Server (NTRS)

    Williams, David E.; Dake, Jason R.; Gentry, Gregory J

    2013-01-01

    The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the prior year, covering the period of time between March 2011 and February 2012. The ISS continued permanent crew operations including the continuation of six crew members being on ISS. Work continues on the last of the Phase 3 pressurized elements, the commercial cargo resupply vehicles, and work to try and extend ISS service life from 2015 to at least 2028.

  12. International Space Station Environmental Control and Life Support System Previous Year Status for 2013 - 2014

    NASA Technical Reports Server (NTRS)

    Williams, David E.; Gentry, Gregory J.

    2015-01-01

    The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year and the impacts of the international partners' activities on them, covering the period of time between March 2013 and February 2014. The ISS continued permanent crew operations including the continuation of six crew members being on ISS. Work continues on the commercial crew vehicles, and work to try and extend ISS service life.

  13. Total Probability of Collision as a Metric for Finite Conjunction Assessment and Collision Risk Management

    NASA Technical Reports Server (NTRS)

    Frigm, Ryan C.; Hejduk, Matthew D.; Johnson, Lauren C.; Plakalovic, Dragan

    2015-01-01

    On-orbit collision risk is becoming an increasing mission risk to all operational satellites in Earth orbit. Managing this risk can be disruptive to mission and operations, present challenges for decision-makers, and is time-consuming for all parties involved. With the planned capability improvements to detecting and tracking smaller orbital debris and capacity improvements to routinely predict on-orbit conjunctions, this mission risk will continue to grow in terms of likelihood and effort. It is very real possibility that the future space environment will not allow collision risk management and mission operations to be conducted in the same manner as it is today. This paper presents the concept of a finite conjunction assessment-one where each discrete conjunction is not treated separately but, rather, as a continuous event that must be managed concurrently. The paper also introduces the Total Probability of Collision as an analogous metric for finite conjunction assessment operations and provides several options for its usage in a Concept of Operations.

  14. On-Orbit Propulsion System Performance of ISS Visiting Vehicles

    NASA Technical Reports Server (NTRS)

    Martin, Mary Regina M.; Swanson, Robert A.; Kamath, Ulhas P.; Hernandez, Francisco J.; Spencer, Victor

    2013-01-01

    The International Space Station (ISS) represents the culmination of over two decades of unprecedented global human endeavors to conceive, design, build and operate a research laboratory in space. Uninterrupted human presence in space since the inception of the ISS has been made possible by an international fleet of space vehicles facilitating crew rotation, delivery of science experiments and replenishment of propellants and supplies. On-orbit propulsion systems on both ISS and Visiting Vehicles are essential to the continuous operation of the ISS. This paper compares the ISS visiting vehicle propulsion systems by providing an overview of key design drivers, operational considerations and performance characteristics. Despite their differences in design, functionality, and purpose, all visiting vehicles must adhere to a common set of interface requirements along with safety and operational requirements. This paper addresses a wide variety of methods for satisfying these requirements and mitigating credible hazards anticipated during the on-orbit life of propulsion systems, as well as the seamless integration necessary for the continued operation of the ISS.

  15. An evaluation of grease type ball bearing lubricants operating in various environments

    NASA Technical Reports Server (NTRS)

    Mcmurtrey, E. L.

    1984-01-01

    Because many future spacecraft or space stations will require mechanisms to operate for long periods of time in environments which are adverse to most bearing lubricants, a series of tests has been completed to evaluate 38 grease type lubricants in R-4 size bearings in five different environments for a 1 year period. Four repetitions of each test were made to provide statistical samples. These tests were also used to select four lubricants for 5 year tests in selected environments with five repetitions of each test for statistical samples. In this completed program, 172 test sets have been completed. The three 5 year tests in: (1) continuous operation and (2) start stop operation, with both in vacuum at ambient temperatures, and (3) continuous vacuum operation at 93.3 C have been completed. In both the 1 year and 5 year tests, the best results in all environments have been obtained with a high viscosity index perfluoroalkylpolyether (PFPE) grease.

  16. Prepare to protect: Operating and maintaining a tornado safe room.

    PubMed

    Herseth, Andrew; Goldsmith-Grinspoon, Jennifer; Scott, Pataya

    2017-06-01

    Operating and maintaining a tornado safe room can be critical to the effective continuity of business operations because a firm's most valuable asset is its people. This paper describes aspects of operations and maintenance (O&M) for existing tornado safe rooms as well as a few planning and design aspects that affect the ultimate operation of a safe room for situations where a safe room is planned, but not yet constructed. The information is based on several Federal Emergency Management Agency safe room publications that provide guidance on emergency management and operations, as well as the design and construction of tornado safe rooms.

  17. NASA operations: An agency wide approach to reduce cost

    NASA Technical Reports Server (NTRS)

    Squibb, Gael F.

    1996-01-01

    The NASA Space Operations Management Office (SOMO) is presented. The SOMO concept is based on continuing the distributed participation of the various NASA field centers and agencies, while employing consolidated management through a single lead center. The aim is to determine the duplicity and the overlap between the different agencies that independently developed their own operations management approaches in order to enable more cost effective mission operations by providing common services to the NASA programs. The space operations management will be performed in a distributed manner with a greater degree of contractor involvement than in the past. The changes, approaches and anticipated benefits of this approach to operations are discussed.

  18. Observatories, think tanks, and community models in the hydrologic and environmental sciences: How does it affect me?

    NASA Astrophysics Data System (ADS)

    Torgersen, Thomas

    2006-06-01

    Multiple issues in hydrologic and environmental sciences are now squarely in the public focus and require both government and scientific study. Two facts also emerge: (1) The new approach being touted publicly for advancing the hydrologic and environmental sciences is the establishment of community-operated "big science" (observatories, think tanks, community models, and data repositories). (2) There have been important changes in the business of science over the last 20 years that make it important for the hydrologic and environmental sciences to demonstrate the "value" of public investment in hydrological and environmental science. Given that community-operated big science (observatories, think tanks, community models, and data repositories) could become operational, I argue that such big science should not mean a reduction in the importance of single-investigator science. Rather, specific linkages between the large-scale, team-built, community-operated big science and the single investigator should provide context data, observatory data, and systems models for a continuing stream of hypotheses by discipline-based, specialized research and a strong rationale for continued, single-PI ("discovery-based") research. I also argue that big science can be managed to provide a better means of demonstrating the value of public investment in the hydrologic and environmental sciences. Decisions regarding policy will still be political, but big science could provide an integration of the best scientific understanding as a guide for the best policy.

  19. Thermal monitoring, measurement, and control system for a Volatile Condensable Materials (VCM) test apparatus

    NASA Technical Reports Server (NTRS)

    Ives, R. E.

    1982-01-01

    A thermal monitoring and control concept is described for a volatile condensable materials (VCM) test apparatus where electric resistance heaters are employed. The technique is computer based, but requires only proportioning ON/OFF relay control signals supplied through a programmable scanner and simple quadrac power controllers. System uniqueness is derived from automatic temperature measurements and the averaging of these measurements in discrete overlapping temperature zones. Overall control tolerance proves to be better than + or - 0.5 C from room ambient temperature to 150 C. Using precisely calibrated thermocouples, the method provides excellent temperature control of a small copper VCM heating plate at 125 + or - 0.2 C over a 24 hr test period. For purposes of unattended operation, the programmable computer/controller provides a continual data printout of system operation. Real time operator command is also provided for, as is automatic shutdown of the system and operator alarm in the event of malfunction.

  20. Nanofiber adsorbents for high productivity continuous downstream processing.

    PubMed

    Hardick, Oliver; Dods, Stewart; Stevens, Bob; Bracewell, Daniel G

    2015-11-10

    An ever increasing focus is being placed on the manufacturing costs of biotherapeutics. The drive towards continuous processing offers one opportunity to address these costs through the advantages it offers. Continuous operation presents opportunities for real-time process monitoring and automated control with potential benefits including predictable product specification, reduced labour costs, and integration with other continuous processes. Specifically to chromatographic operations continuous processing presents an opportunity to use expensive media more efficiently while reducing their size and therefore cost. Here for the first time we show how a new adsorbent material (cellulosic nanofibers) having advantageous convective mass transfer properties can be combined with a high frequency simulated moving bed (SMB) design to provide superior productivity in a simple bioseparation. Electrospun polymeric nanofiber adsorbents offer an alternative ligand support surface for bioseparations. Their non-woven fiber structure with diameters in the sub-micron range creates a remarkably high surface area material that allows for rapid convective flow operations. A proof of concept study demonstrated the performance of an anion exchange nanofiber adsorbent based on criteria including flow and mass transfer properties, binding capacity, reproducibility and life-cycle performance. Binding capacities of the DEAE adsorbents were demonstrated to be 10mg/mL, this is indeed only a fraction of what is achievable from porous bead resins but in combination with a very high flowrate, the productivity of the nanofiber system is shown to be significant. Suitable packing into a flow distribution device has allowed for reproducible bind-elute operations at flowrates of 2,400 cm/h, many times greater than those used in typical beaded systems. These characteristics make them ideal candidates for operation in continuous chromatography systems. A SMB system was developed and optimised to demonstrate the productivity of nanofiber adsorbents through rapid bind-elute cycle times of 7s which resulted in a 15-fold increase in productivity compared with packed bed resins. Reproducible performance of BSA purification was demonstrated using a 2-component protein solution of BSA and cytochrome c. The SMB system exploits the advantageous convective mass transfer properties of nanofiber adsorbents to provide productivities much greater than those achievable with conventional chromatography media. Copyright © 2015 The Authors. Published by Elsevier B.V. All rights reserved.

  1. Transforming Our SMEX Organization by Way of Innovation, Standardization, and Automation

    NASA Technical Reports Server (NTRS)

    Madden, Maureen; Crouse, Pat; Carry, Everett; Esposito, timothy; Parker, Jeffrey; Bradley, David

    2006-01-01

    NASA's Small Explorer (SMEX) Flight Operations Team (FOT) is currently tackling the challenge of supporting ground operations for several satellites that have surpassed their designed lifetime and have a dwindling budget. At Goddard Space Flight Center (GSFC), these missions are presently being reengineered into a fleet-oriented ground system. When complete, this ground system will provide command and control of four SMEX missions, and will demonstrate fleet automation and control concepts as a pathfinder for additional mission integrations. A goal of this reengineering effort is to demonstrate new ground-system technologies that show promise of supporting longer mission lifecycles and simplifying component integration. In pursuit of this goal, the SMEX organization has had to examine standardization, innovation, and automation. A core technology being demonstrated in this effort is the GSFC Mission Services Evolution Center (GMSEC) architecture. The GMSEC architecture focuses on providing standard interfaces for ground system applications to promote application interoperability. Building around commercial Message Oriented Middleware and providing a common messaging standard allows GMSEC to provide the capabilities necessary to support integration of new software components into existing missions and increase the level of interaction within the system. For SMS, GMSEC has become the technology platform to transform flight operations with the innovation and automation necessary to reduce operational costs. The automation technologies supported in SMEX are built upon capabilities provided by the GMSEC architecture that allows the FOT to further reduce the involvement of the console, operator. Initially, SMEX is automating only routine operations, such as safety and health monitoring, basic commanding, and system recovery. The operational concepts being developed here will reduce the need for staffed passes and are a necessity for future fleet management. As this project continues to evolve, additional innovations beyond GMSEC and automation have, and will continue to be developed. The team developed techniques for migrating ground systems of existing on-orbit assets. The tools necessary to monitor and control software failures were integrated and tailored for operational environments. All this was done with a focus of extending fleet operations to mission beyond SMU. The result of this work is the foundation for a broader fleet-capable ground system that will include several missions supported by the Space Science Mission Operations Project.

  2. Training and Technical Assistance for Small Systems Funding

    EPA Pesticide Factsheets

    Provides water and wastewater system staff and private well owners with training and tools to enhance system operations and management practices, and support EPA’s continuing efforts to protect public health and promote sustainability.

  3. Notes on Experiments.

    ERIC Educational Resources Information Center

    Physics Education, 1984

    1984-01-01

    Describes: (1) experiments using a simple phonocardiograph; (2) radioactivity experiments involving a VELA used as a ratemeter; (3) a 25cm continuously operating Foucault pendulum; and (4) camera control of experiments. Descriptions of equipment needed are provided when applicable. (JN)

  4. Chapter 5, "License Renewal and Aging Management for Continued Service

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Naus, Dan J

    As of August 2011, there were 104 commercial nuclear power reactors licensed to operate in 31 states in the United States. Initial operating licenses in the United States are granted for a period of 40 years. In order to help assure an adequate energy supply, the USNRC has established a timely license renewal process and clear requirements that are needed to ensure safe plant operation for an extended plant life. The principals of license renewal and the basic requirements that address license renewal are identified as well as additional sources of guidance that can be utilized as part of themore » license renewal process. Aging management program inspections and operating experience related to the concrete and steel containment structures are provided. Finally, several lessons learned are provided based on containment operating experience.« less

  5. Eliminating Deadbands In Resistive Angle Sensors

    NASA Technical Reports Server (NTRS)

    Salomon, Phil M.; Allen, Russell O.; Marchetto, Carl A.

    1992-01-01

    Proposed shaft-angle-measuring circuit provides continuous indication of angle of rotation from 0 degree to 360 degrees. Sensing elements are two continuous-rotation potentiometers, and associated circuitry eliminates deadband that occurs when wiper contact of potentiometer crosses end contacts near 0 degree position of circular resistive element. Used in valve-position indicator or similar device in which long operating life and high angular precision not required.

  6. Optimally moderated nuclear fission reactor and fuel source therefor

    DOEpatents

    Ougouag, Abderrafi M [Idaho Falls, ID; Terry, William K [Shelley, ID; Gougar, Hans D [Idaho Falls, ID

    2008-07-22

    An improved nuclear fission reactor of the continuous fueling type involves determining an asymptotic equilibrium state for the nuclear fission reactor and providing the reactor with a moderator-to-fuel ratio that is optimally moderated for the asymptotic equilibrium state of the nuclear fission reactor; the fuel-to-moderator ratio allowing the nuclear fission reactor to be substantially continuously operated in an optimally moderated state.

  7. Continual improvement plan

    NASA Technical Reports Server (NTRS)

    1994-01-01

    NASA's approach to continual improvement (CI) is a systems-oriented, agency-wide approach that builds on the past accomplishments of NASA Headquarters and its field installations and helps achieve NASA's vision, mission, and values. The NASA of the future will fully use the principles of continual improvement in every aspect of its operations. This NASA CI plan defines a systematic approach and a model for continual improvement throughout NASA, stressing systems integration and optimization. It demonstrates NASA's constancy of purpose for improvement - a consistent vision of NASA as a worldwide leader in top-quality science, technology, and management practices. The CI plan provides the rationale, structures, methods, and steps, and it defines NASA's short term (1-year) objectives for improvement. The CI plan presents the deployment strategies necessary for cascading the goals and objectives throughout the agency. It also provides guidance on implementing continual improvement with participation from top leadership and all levels of employees.

  8. Viking Phase III

    NASA Technical Reports Server (NTRS)

    1978-01-01

    VIKING PHASE III - With the incredible success of the Viking missions on Mars, mission operations have progressed though a series of phases - each being funded as mission success dictated its potential. The Viking Primary Mission phase was concluded in November, 1976, when the reins were passed on to the second phase - the Viking Extended Mission. The Extended Mission successfully carried spacecraft operations through the desired period of time needed to provided a profile of a full Martian year, but would have fallen a little short of connecting and overlapping a full Martian year of Viking operations which scientists desired as a means of determining the degree of duplicity in the red planet's seasons - at least for the summer period. Without this continuation of spacecraft data acquisitions to and beyond the seasonal points when the spacecraft actually began their Mars observations, there would be no way of knowing whether the changing environmental values - such as temperatures and winds atmospheric dynamics and water vapor, surface thermal dynamics, etc. - would match up with those acquired as the spacecraft began investigations during the summer and fall of 1976. This same broad interest can be specifically pursued at the surface - where hundreds of rocks, soil drifts and other features have become extremely familiar during long-term analysis. This picture was acquired on the 690th Martian day of Lander 1 operations - 4009th picture sequence commanded of the two Viking Landers. As such, it became the first picture acquired as the third phase of Viking operations got under way - the Viking Continuation Mission. Between the start of the Continuation Mission in April, 1978, until spacecraft operations are concluded in November, the landers will acquire an additional 200 pictures. These will be used to monitor the two landscaped for the surface changes. All four cameras, two on Lander 1 and two on Lander 2, continue to operate perfectly. Both landers will also continue to monitor weather conditions - recording atmospheric pressure and its variations, daily temperature extremes, and wind behavior at the two lander locations.

  9. Worker classifications: the redefined role of the independent contractor.

    PubMed

    Burns, L P

    1997-01-01

    Five factors to be used in determining whether a physician is subject to the requisite level of control to be classified as a hospital employee: 1. integration of the physician's services into the hospital's operations. 2. the regularity and continuity of the physician's services 3. the authority reserved by the hospital to require the physician to comply with its operating procedures 4. whether the benefits provided to regular hospital employees are available to the physician 5. whether the physician is permitted to provide services to the general public.

  10. Future supply chains enabled by continuous processing--opportunities and challenges. May 20-21, 2014 Continuous Manufacturing Symposium.

    PubMed

    Srai, Jagjit Singh; Badman, Clive; Krumme, Markus; Futran, Mauricio; Johnston, Craig

    2015-03-01

    This paper examines the opportunities and challenges facing the pharmaceutical industry in moving to a primarily "continuous processing"-based supply chain. The current predominantly "large batch" and centralized manufacturing system designed for the "blockbuster" drug has driven a slow-paced, inventory heavy operating model that is increasingly regarded as inflexible and unsustainable. Indeed, new markets and the rapidly evolving technology landscape will drive more product variety, shorter product life-cycles, and smaller drug volumes, which will exacerbate an already unsustainable economic model. Future supply chains will be required to enhance affordability and availability for patients and healthcare providers alike despite the increased product complexity. In this more challenging supply scenario, we examine the potential for a more pull driven, near real-time demand-based supply chain, utilizing continuous processing where appropriate as a key element of a more "flow-through" operating model. In this discussion paper on future supply chain models underpinned by developments in the continuous manufacture of pharmaceuticals, we have set out; The significant opportunities to moving to a supply chain flow-through operating model, with substantial opportunities in inventory reduction, lead-time to patient, and radically different product assurance/stability regimes. Scenarios for decentralized production models producing a greater variety of products with enhanced volume flexibility. Production, supply, and value chain footprints that are radically different from today's monolithic and centralized batch manufacturing operations. Clinical trial and drug product development cost savings that support more rapid scale-up and market entry models with early involvement of SC designers within New Product Development. The major supply chain and industrial transformational challenges that need to be addressed. The paper recognizes that although current batch operational performance in pharma is far from optimal and not necessarily an appropriate end-state benchmark for batch technology, the adoption of continuous supply chain operating models underpinned by continuous production processing, as full or hybrid solutions in selected product supply chains, can support industry transformations to deliver right-first-time quality at substantially lower inventory profiles. © 2015 Wiley Periodicals, Inc. and the American Pharmacists Association.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fitzpatrick, Stephen W.

    This project involved a three-year program managed by BioMetics, Inc. (Waltham, MA) to demonstrate the commercial feasibility of Biofine thermochemical process technology for conversion of cellulose-containing wastes or renewable materials into levulinic acid, a versatile platform chemical. The program, commencing in October 1995, involved the design, procurement, construction and operation of a plant utilizing the Biofine process to convert 1 dry ton per day of paper sludge waste. The plant was successfully designed, constructed, and commissioned in 1997. It was operated for a period of one year on paper sludge from a variety of source paper mills to collect datamore » to verify the design for a commercial scale plant. Operational results were obtained for four different feedstock varieties. Stable, continuous operation was achieved for two of the feedstocks. Continuous operation of the plant at demonstration scale provided the opportunity for process optimization, development of operational protocols, operator training and identification of suitable materials of construction for scale up to commercial operation . Separated fiber from municipal waster was also successfully processed. The project team consisted of BioMetics Inc., Great Lakes Chemical Corporation (West Lafayette, IN), and New York State Energy Research and Development Authority (Albany, NY).« less

  12. Influences of operational parameters on phosphorus removal in batch and continuous electrocoagulation process performance.

    PubMed

    Nguyen, Dinh Duc; Yoon, Yong Soo; Bui, Xuan Thanh; Kim, Sung Su; Chang, Soon Woong; Guo, Wenshan; Ngo, Huu Hao

    2017-11-01

    Performance of an electrocoagulation (EC) process in batch and continuous operating modes was thoroughly investigated and evaluated for enhancing wastewater phosphorus removal under various operating conditions, individually or combined with initial phosphorus concentration, wastewater conductivity, current density, and electrolysis times. The results revealed excellent phosphorus removal (72.7-100%) for both processes within 3-6 min of electrolysis, with relatively low energy requirements, i.e., less than 0.5 kWh/m 3 for treated wastewater. However, the removal efficiency of phosphorus in the continuous EC operation mode was better than that in batch mode within the scope of the study. Additionally, the rate and efficiency of phosphorus removal strongly depended on operational parameters, including wastewater conductivity, initial phosphorus concentration, current density, and electrolysis time. Based on experimental data, statistical model verification of the response surface methodology (RSM) (multiple factor optimization) was also established to provide further insights and accurately describe the interactive relationship between the process variables, thus optimizing the EC process performance. The EC process using iron electrodes is promising for improving wastewater phosphorus removal efficiency, and RSM can be a sustainable tool for predicting the performance of the EC process and explaining the influence of the process variables.

  13. Software control program for 25 kW breadboard testing. [spacecraft power supplies; high voltage batteries

    NASA Technical Reports Server (NTRS)

    Pajak, J. A.

    1981-01-01

    A data acquisition software program developed to operate in conjunction with the automated control system of the 25 kW PM Electric Power System Breadboard Test facility is described. The proram provides limited interactive control of the breadboard test while acquiring data and monitoring parameters, allowing unattended continuous operation. The breadboard test facility has two positions for operating separate configurations. The main variable in each test setup is the high voltage Ni-Cd battery.

  14. A Guidance Document for Kentucky's Oil and Gas Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    1998-11-10

    This technical report is a summary of the progress made for "A Guidance Document for Kentucky's Oil and Gas Operators". During this quarter, the document received continued review and editing in an elec-tronic format to satisfy the United States Department of Energy (DOE). Comments received from oil and gas operators reviewing this document prompted contact to be made with the United States Environmental Protection Agency (USEPA) to develop an addendum section to provide better explanation of USEPA requirements for Class II injection wells in Kentucky.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baucom, R.M.; Marchello, J.M.

    Thermoplastic prepregs of LARC-TPI have been produced in a fluidized bed unit on spread continuous fiber tows. The powders are melted on the fibers by radiant heating to adhere the polymer to the fiber. This process produces tow prepreg uniformly without imposing severe stress on the fibers or requiring long high temperature residence times for the polymer. Unit design theory and operating correlations have been developed to provide the basis for scale up to commercial operation. Special features of the operation are the pneumatic tow spreader, fluidized bed and resin feed systems.

  16. Meteorological support for space operations: Review and recommendations

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The current meteorological support provided to NASA by NOAA, Air Weather Service, and other contractors is reviewed and suggestions are offered for its improvement. These recommendations include improvement in NASA's internal management organizational structure that would accommodate continued improvement in operational weather support, installation of new observing systems, improvement in analysis and forecasting procedures, and the establishment of an Applied Research and Forecasting Facility.

  17. Priority coding for control room alarms

    DOEpatents

    Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.

    1994-01-01

    Indicating the priority of a spatially fixed, activated alarm tile on an alarm tile array by a shape coding at the tile, and preferably using the same shape coding wherever the same alarm condition is indicated elsewhere in the control room. The status of an alarm tile can change automatically or by operator acknowledgement, but tones and/or flashing cues continue to provide status information to the operator.

  18. 78 FR 21245 - Continuity of Operations Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ...; Order No. 778] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. SUMMARY: In this Final Rule the Commission revises its Continuity of Operations Plan... Commission's Continuity of Operations Plan (COOP) regulations to incorporate its regional offices into the...

  19. Transitioning GONG data processing to NOAA SWPC operations

    NASA Astrophysics Data System (ADS)

    Reinard, A.; Marble, A.; Hill, F.; Berger, T. E.

    2015-12-01

    The NOAA Space Weather Prediction Center (SWPC) is the nation's official source of space weather watches, warnings, and alerts, providing 24x7 forecasting and support to critical infrastructure operators around the world. Observations of the conditions on the Sun are crucial for determining when and if a warning is needed. The Global Oscillation Network Group (GONG) operated by the National Solar Observatory (NSO) consists of six ground stations, allowing continuous observations of the Sun. Of particular interest for space weather purposes are the H-alpha images and magnetograms. The H-alpha data are used to identify filaments and their eruptions, to assess active region evolution and plage extent, and to help localize flare locations. The magnetograms are used to identify neutral lines, to examine potential shearing areas and to characterize the magnetic structure of active regions. GONG magnetograms also provide the initial condition for models of solar wind expansion through the heliosphere such as the WSA-Enlil model. Although beyond the scope of current space weather applications, GONG helioseismology products can be used to assess active region emergence on the far side of the Sun and to indicate the flaring potential of a front-side active region. These products are being examined as future tools in flare prediction. NSO has operated GONG as a science facility since 1995 and has provided processed space weather data products to NOAA via public internet connections for the past several years. In 2014 the White House Office of Management and Budget (OMB) requested that NOAA transition the GONG network to an operational space weather asset in order to ensure the continued flow of critical magnetogram data for solar wind models. NSO will continue to operate and manage the instruments and sites, but the H-alpha images and 10 minute averaged magnetogram data will be sent directly to SWPC for processing and use in space weather modeling. SWPC will make these data available to NSO and the public via the new NOAA Integrated Dissemination Program (IDP) network. We discuss the progress and details of this change.

  20. Transitioning GONG data processing to NOAA SWPC operations

    NASA Astrophysics Data System (ADS)

    Reinard, Alysha; Marble, Andrew R.; Berger, Thomas

    2016-05-01

    The NOAA Space Weather Prediction Center (SWPC) is the nation's official source of space weather watches, warnings, and alerts, providing 24x7 forecasting and support to critical infrastructure operators around the world. Observations of the conditions on the Sun are crucial for determining when and if a warning is needed. The Global Oscillation Network Group (GONG) operated by the National Solar Observatory (NSO) consists of six ground stations, allowing continuous observations of the Sun. Of particular interest for space weather purposes are the H-alpha images and magnetograms. The H-alpha data are used to identify filaments and their eruptions, to assess active region evolution and plage extent, and to help localize flare locations. The magnetograms are used to identify neutral lines, to examine potential shearing areas and to characterize the magnetic structure of active regions. GONG magnetograms also provide the initial condition for models of solar wind expansion through the heliosphere such as the WSA-Enlil model. Although beyond the scope of current space weather applications, GONG helioseismology products can be used to assess active region emergence on the far side of the Sun and to indicate the flaring potential of a front-side active region. These products are being examined as future tools in flare prediction.NSO has operated GONG as a science facility since 1995 and has provided processed space weather data products to NOAA via for the past several years. In 2014 the White House Office of Management and Budget (OMB) requested that NOAA transition the GONG network to an operational space weather asset in order to ensure the continued flow of critical data for solar wind models. NSO will continue to operate and manage the instruments and sites, but the H-alpha images and 10 minute averaged magnetogram data will be sent directly to SWPC for processing and use in space weather modeling. SWPC will make these data available to NSO and the public via the new NOAA Integrated Dissemination Program (IDP) network. We discuss the progress and details of this change.

  1. 47 CFR 95.1105 - Eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PERSONAL RADIO SERVICES Wireless Medical Telemetry Service (WMTS) General Provisions § 95.1105 Eligibility. Authorized health care providers are authorized by rule to operate transmitters in the Wireless Medical Telemetry...

  2. Ultrathin conformal devices for precise and continuous thermal characterization of human skin

    PubMed Central

    Webb, R. Chad; Bonifas, Andrew P.; Behnaz, Alex; Zhang, Yihui; Yu, Ki Jun; Cheng, Huanyu; Shi, Mingxing; Bian, Zuguang; Liu, Zhuangjian; Kim, Yun-Soung; Yeo, Woon-Hong; Park, Jae Suk; Song, Jizhou; Li, Yuhang; Huang, Yonggang; Gorbach, Alexander M.; Rogers, John A.

    2013-01-01

    Precision thermometry of the skin can, together with other measurements, provide clinically relevant information about cardiovascular health, cognitive state, malignancy and many other important aspects of human physiology. Here, we introduce an ultrathin, compliant skin-like sensor/actuator technology that can pliably laminate onto the epidermis to provide continuous, accurate thermal characterizations that are unavailable with other methods. Examples include non-invasive spatial mapping of skin temperature with millikelvin precision, and simultaneous quantitative assessment of tissue thermal conductivity. Such devices can also be implemented in ways that reveal the time-dynamic influence of blood flow and perfusion on these properties. Experimental and theoretical studies establish the underlying principles of operation, and define engineering guidelines for device design. Evaluation of subtle variations in skin temperature associated with mental activity, physical stimulation and vasoconstriction/dilation along with accurate determination of skin hydration through measurements of thermal conductivity represent some important operational examples. PMID:24037122

  3. Ultrathin conformal devices for precise and continuous thermal characterization of human skin

    NASA Astrophysics Data System (ADS)

    Webb, R. Chad; Bonifas, Andrew P.; Behnaz, Alex; Zhang, Yihui; Yu, Ki Jun; Cheng, Huanyu; Shi, Mingxing; Bian, Zuguang; Liu, Zhuangjian; Kim, Yun-Soung; Yeo, Woon-Hong; Park, Jae Suk; Song, Jizhou; Li, Yuhang; Huang, Yonggang; Gorbach, Alexander M.; Rogers, John A.

    2013-10-01

    Precision thermometry of the skin can, together with other measurements, provide clinically relevant information about cardiovascular health, cognitive state, malignancy and many other important aspects of human physiology. Here, we introduce an ultrathin, compliant skin-like sensor/actuator technology that can pliably laminate onto the epidermis to provide continuous, accurate thermal characterizations that are unavailable with other methods. Examples include non-invasive spatial mapping of skin temperature with millikelvin precision, and simultaneous quantitative assessment of tissue thermal conductivity. Such devices can also be implemented in ways that reveal the time-dynamic influence of blood flow and perfusion on these properties. Experimental and theoretical studies establish the underlying principles of operation, and define engineering guidelines for device design. Evaluation of subtle variations in skin temperature associated with mental activity, physical stimulation and vasoconstriction/dilation along with accurate determination of skin hydration through measurements of thermal conductivity represent some important operational examples.

  4. Investigation on the Mechanical and Electrical Behavior of a Tuning Fork-Shaped Ionic Polymer Metal Composite Actuator with a Continuous Water Supply Mechanism

    PubMed Central

    Feng, Guo-Hua; Huang, Wei-Lun

    2016-01-01

    This paper presents an innovative tuning fork-shaped ionic polymer metal composite (IPMC) actuator. With an integrated soft strain gauge and water supply mechanism (WSM), the surface strain of the actuator can be sensed in situ, and providing a continuous water supply maintains the water content inside the IPMC for long-term operation in air. The actuator was fabricated using a micromachining technique and plated with a nickel electrode. The device performance was experimentally characterized and compared with an actuator without a WSM. A large displacement of 1.5 mm was achieved for a 6 mm-long prong with 7-V dc actuation applied for 30 s. The measured current was analyzed using an electrochemical model. The results revealed that the faradaic current plays a crucial role during operation, particularly after 10 s. The measured strain confirms both the bending and axial strain generation during the open-and-close motion of the actuator prongs. Most of the water loss during device operation was due to evaporation rather than hydrolysis. The constructed WSM effectively maintained the water content inside the IPMC for long-term continuous operation. PMID:27023549

  5. Investigation on the Mechanical and Electrical Behavior of a Tuning Fork-Shaped Ionic Polymer Metal Composite Actuator with a Continuous Water Supply Mechanism.

    PubMed

    Feng, Guo-Hua; Huang, Wei-Lun

    2016-03-25

    This paper presents an innovative tuning fork-shaped ionic polymer metal composite (IPMC) actuator. With an integrated soft strain gauge and water supply mechanism (WSM), the surface strain of the actuator can be sensed in situ, and providing a continuous water supply maintains the water content inside the IPMC for long-term operation in air. The actuator was fabricated using a micromachining technique and plated with a nickel electrode. The device performance was experimentally characterized and compared with an actuator without a WSM. A large displacement of 1.5 mm was achieved for a 6 mm-long prong with 7-V dc actuation applied for 30 s. The measured current was analyzed using an electrochemical model. The results revealed that the faradaic current plays a crucial role during operation, particularly after 10 s. The measured strain confirms both the bending and axial strain generation during the open-and-close motion of the actuator prongs. Most of the water loss during device operation was due to evaporation rather than hydrolysis. The constructed WSM effectively maintained the water content inside the IPMC for long-term continuous operation.

  6. Facility design consideration for continuous mix production of class 1.3 propellant

    NASA Technical Reports Server (NTRS)

    Williamson, K. L.; Schirk, P. G.

    1994-01-01

    In November of 1989, NASA awarded the Advanced Solid Rocket Motor (ASRM) contract to Lockheed Missiles and Space Company (LMSC) for production of advanced solid rocket motors using the continuous mix process. Aerojet ASRM division (AAD) was selected as the facility operator and RUST International Corporation provided the engineering, procurement, and construction management services. The continuous mix process mandates that the mix and cast facilities be 'close-coupled' along with the premix facilities, creating unique and challenging requirements for the facility designer. The classical approach to handling energetic materials-division into manageable quantities, segregation, and isolation-was not available due to these process requirements and quantities involved. This paper provides a description of the physical facilities, the continuous mix process, and discusses the monitoring and detection techniques used to mitigate hazards and prevent an incident.

  7. Unmanned Aircraft Systems Traffic Management (UTM) Safely Enabling UAS Operations in Low-Altitude Airspace

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal H.

    2016-01-01

    Unmanned Aircraft System (UAS) Traffic Management (UTM) Enabling Civilian Low-Altitude Airspace and Unmanned Aircraft System Operations What is the problem? Many beneficial civilian applications of UAS have been proposed, from goods delivery and infrastructure surveillance, to search and rescue, and agricultural monitoring. Currently, there is no established infrastructure to enable and safely manage the widespread use of low-altitude airspace and UAS operations, regardless of the type of UAS. A UAS traffic management (UTM) system for low-altitude airspace may be needed, perhaps leveraging concepts from the system of roads, lanes, stop signs, rules and lights that govern vehicles on the ground today, whether the vehicles are driven by humans or are automated. What system technologies is NASA exploring? Building on its legacy of work in air traffic management for crewed aircraft, NASA is researching prototype technologies for a UAS Traffic Management (UTM) system that could develop airspace integration requirements for enabling safe, efficient low-altitude operations. While incorporating lessons learned from the today's well-established air traffic management system, which was a response that grew out of a mid-air collision over the Grand Canyon in the early days of commercial aviation, the UTM system would enable safe and efficient low-altitude airspace operations by providing services such as airspace design, corridors, dynamic geofencing, severe weather and wind avoidance, congestion management, terrain avoidance, route planning and re-routing, separation management, sequencing and spacing, and contingency management. One of the attributes of the UTM system is that it would not require human operators to monitor every vehicle continuously. The system could provide to human managers the data to make strategic decisions related to initiation, continuation, and termination of airspace operations. This approach would ensure that only authenticated UAS could operate in the airspace. In its most mature form, the UTM system could be developed using autonomicity characteristics that include self-configuration, self-optimization and self-protection. The self-configuration aspect could determine whether the operations should continue given the current andor predicted windweather conditions. NASA envisions concepts for two types of possible UTM systems. The first type would be a Portable UTM system, which would move from between geographical areas and support operations such as precision agriculture and disaster relief. The second type of system would be a Persistent UTM system, which would support low-altitude operations and provide continuous coverage for a geographical area. Either system would require persistent communication, navigation, and surveillance (CNS) coverage to track, ensure, and monitor conformance. What is NASA doing to test the technologies? NASA's near-term goal is the development and demonstration of a possible future UTM system that could safely enable low-altitude airspace and UAS operations. Working alongside many committed government, industry and academic partners, NASA is leading the research, development and testing that is taking place in a series of activities called Technology Capability Levels (TCL), each increasing in complexity. UTM TCL1 concluded field testing in August 2015 and is undergoing additional testing at an FAA site.

  8. 40 CFR 62.15220 - What additional requirements must I meet for the operation of my continuous emission monitoring...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? 62.15220 Section 62.15220 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... the operation of my continuous emission monitoring systems and continuous opacity monitoring system...

  9. 40 CFR 62.15220 - What additional requirements must I meet for the operation of my continuous emission monitoring...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? 62.15220 Section 62.15220 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... the operation of my continuous emission monitoring systems and continuous opacity monitoring system...

  10. Business Leaders in Action Results for America, Leadership Report for 2010

    DTIC Science & Technology

    2010-03-23

    continuing to make BENS the best source of mission-critical busin ess practice in national security affairs. We will continue BENS’ work in those areas w...challenges in cyber s ecurity, the national debt, intelligence operations and technological innovation, our country needs leaders like you to improve... Intelligence – BENS members are providing intelligence analysts with a deeper understanding of the financial industry and its importance to national

  11. Report on Enhancing Security and Stability in Afghanistan

    DTIC Science & Technology

    2015-06-01

    Warrior helicopters, the AAF’s organic capability to provide aerial fires continues to grow. However, the AAF continues to struggle with a shortage ...of pilots and aircrews, as well as the maintenance of air platforms. To address the pilot shortage , coalition forces are pursuing the addition of...historically ordered supplies for the ANDSF, Afghan personnel have little experience doing it themselves. As a result, reported shortages in operational units

  12. Conducting Research on the International Space Station Using the EXPRESS Rack Facilities

    NASA Technical Reports Server (NTRS)

    Thompson, Sean W.; Lake, Robert E.

    2014-01-01

    EXPRESS Racks provide capability for payload access to ISS resources. The successful on-orbit operations and versatility of the EXPRESS Rack has facilitated the operations of many scientific areas, with the promise of continued payload support for years to come. EXPRESS Racks are currently deployed in the US Lab, Columbus and JEM. Process improvements and enhancements continue to improve the accommodations and make the integration and operations process more efficient. Payload Integration Managers serve as the primary interface between the ISS Program and EXPRESS Payload Developers. EXPRESS Project coordinates across multiple functional areas and organizations to ensure integrated EXPRESS Rack and subrack products and hardware are complete, accurate, on time, safe, and certified for flight. NASA is planning to expand the EXPRESS payload capacity by developing new Basic Express Racks expected to be on ISS in 2018.

  13. High voltage AC plasma torches with long electric arcs for plasma-chemical applications

    NASA Astrophysics Data System (ADS)

    Surov, A. V.; Popov, S. D.; Serba, E. O.; Pavlov, A. V.; Nakonechny, Gh V.; Spodobin, V. A.; Nikonov, A. V.; Subbotin, D. I.; Borovskoy, A. M.

    2017-04-01

    Powerful AC plasma torches are in demand for a number of advanced plasma chemical applications, they can provide high enthalpy of the working gas. IEE RAS specialists have developed a number of models of stationary thermal plasma torches for continuous operation on air with the power from 5 to 500 kW, and on mixture of H2O, CO2 and CH4 up to 150 kW. AC plasma torches were tested on the pilot plasmachemical installations. Powerful AC plasma torch with hollow electrodes and the gas vortex stabilization of arc in cylindrical channels and its operation characteristics are presented. Lifetime of its continuous operation on air is 2000 hours and thermal efficiency is about 92%, the electric arc length between two electrodes of the plasma torch exceeds 2 m.

  14. Organic rankine cycle system for use with a reciprocating engine

    DOEpatents

    Radcliff, Thomas D.; McCormick, Duane; Brasz, Joost J.

    2006-01-17

    In a waste heat recovery system wherein an organic rankine cycle system uses waste heat from the fluids of a reciprocating engine, provision is made to continue operation of the engine even during periods when the organic rankine cycle system is inoperative, by providing an auxiliary pump and a bypass for the refrigerant flow around the turbine. Provision is also made to divert the engine exhaust gases from the evaporator during such periods of operation. In one embodiment, the auxiliary pump is made to operate simultaneously with the primary pump during normal operations, thereby allowing the primary pump to operate at lower speeds with less likelihood of cavitation.

  15. International Space Station Environmental Control and Life Support System Status: 2002-2003

    NASA Technical Reports Server (NTRS)

    Wiliams, David E.; Lewis, John F.; Gentry, Gregory

    2003-01-01

    The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between April 2002 and March 2003. The ISS continued permanent crew operations, with the start of Phase 3 of the ISS Assembly Sequence. Work continued on the Phase 3 pressurized elements with Node 3 just completing its final design review so that it can proceed towards manufacturing and the continued manufacturing of the regenerative ECLS equipment that will be integrated into Node 3.

  16. International Space Station Environmental Control and Life Support System Status for the Prior Year: 2010-2011

    NASA Technical Reports Server (NTRS)

    Williams, David E.; Dake, Jason R.; Gentry, Gregory J.

    2012-01-01

    The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the prior year, covering the period of time between March 2010 and February 2011. The ISS continued permanent crew operations including the continuation of six crew members being on ISS. Work continues on the last of the Phase 3 pressurized elements, the commercial cargo resupply vehicles, and work to try and extend ISS service life from 2015 to no later than 2028.

  17. International Space Station Environmental Control and Life Support System Status for the Prior Year: 2010 - 2011

    NASA Technical Reports Server (NTRS)

    Williams, David E.; Dake, Jason R.; Gentry, Gregory J.

    2011-01-01

    The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between March 2010 and February 2011. The ISS continued permanent crew operations including the continuation of six crew members being on ISS. Work continues on the last of the Phase 3 pressurized elements, the commercial cargo resupply vehicles, and work to try and extend ISS service life from 2015 to no later than 2028.

  18. The Integration of Health and Counseling Services on College Campuses: Is There a Risk in Maintaining Student Patients' Privacy?

    ERIC Educational Resources Information Center

    Davenport, Robin G.

    2017-01-01

    The formation of integrated centers on college campuses that combine health services and counseling provide clear advantages for students. There is currently no "best practices" model that informs integrated centers' operational procedures. The "continuity of care" requirement of medical providers can conflict with the strict…

  19. 20 CFR 670.505 - What types of training must Job Corps centers provide?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 4 2014-04-01 2014-04-01 false What types of training must Job Corps centers... LABOR (CONTINUED) THE JOB CORPS UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Program Activities and Center Operations § 670.505 What types of training must Job Corps centers provide? (a) Job Corps centers...

  20. Data Specifications for the Landsat Data Continuity Mission

    USGS Publications Warehouse

    Irons, J.R.; Speciale, N.J.; Douglas, McCuistion J.; Masek, J.G.; Markham, B.L.; Storey, James C.; Lencioni, D.E.; Ryan, R.E.

    2003-01-01

    The National Aeronautics and Space Administration (NASA) plans to procure data from a privately-owned and commercially-operated remote sensing system for the next Landsat mission, the Landsat Data Continuity Mission (LDCM). Data requirements are documented in an LDCM Data Specification. The specifications require delivery of data covering 250 Landsat scenes on a daily basis. The data are to be acquired in a manner that affords seasonal coverage of the global land mass. Data are required for the heritage reflective Thematic Mapper (TM) spectral bands plus two new bands, a blue band for coastal zone observations and a short wave infrared band for cirrus cloud detection. The specifications do not require thermal data, representing a departure from the TM heritage. The specification also requires data providing a 30 m ground sample distance for each of the spectral bands with the exception of the new cirrus cloud band at 120 m. An absolute uncertainty of 5 percent or less is required for radiometrically corrected LDCM data and the commercial operator is required to deliver data that can be registered to a cartographic projection with an uncertainty of 65 m or less. Procuring data from a commercial operator represents a new approach for the 30-year-old Landsat Program. The LDCM Data Specification will ensure that the procured data provides continuity of the Landsat data stream and advances the mission.

  1. Hybrid quantum computing with ancillas

    NASA Astrophysics Data System (ADS)

    Proctor, Timothy J.; Kendon, Viv

    2016-10-01

    In the quest to build a practical quantum computer, it is important to use efficient schemes for enacting the elementary quantum operations from which quantum computer programs are constructed. The opposing requirements of well-protected quantum data and fast quantum operations must be balanced to maintain the integrity of the quantum information throughout the computation. One important approach to quantum operations is to use an extra quantum system - an ancilla - to interact with the quantum data register. Ancillas can mediate interactions between separated quantum registers, and by using fresh ancillas for each quantum operation, data integrity can be preserved for longer. This review provides an overview of the basic concepts of the gate model quantum computer architecture, including the different possible forms of information encodings - from base two up to continuous variables - and a more detailed description of how the main types of ancilla-mediated quantum operations provide efficient quantum gates.

  2. Designing an Alternate Mission Operations Control Room

    NASA Technical Reports Server (NTRS)

    Montgomery, Patty; Reeves, A. Scott

    2014-01-01

    The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a service-oriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building.

  3. On the perturbation of the group generalized inverse for a class of bounded operators in Banach spaces

    NASA Astrophysics Data System (ADS)

    Castro-González, N.; Vélez-Cerrada, J. Y.

    2008-05-01

    Given a bounded operator A on a Banach space X with Drazin inverse AD and index r, we study the class of group invertible bounded operators B such that I+AD(B-A) is invertible and . We show that they can be written with respect to the decomposition as a matrix operator, , where B1 and are invertible. Several characterizations of the perturbed operators are established, extending matrix results. We analyze the perturbation of the Drazin inverse and we provide explicit upper bounds of ||B#-AD|| and ||BB#-ADA||. We obtain a result on the continuity of the group inverse for operators on Banach spaces.

  4. INSTALLATION OF A POST-ACCIDENT CONFINEMENT HIGH-LEVEL RADIATION MONITORING SYSTEM IN THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GREENE,G.A.; GUPPY,J.G.

    1998-09-01

    This is the final report on the INSP project entitled, ``Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install andmore » make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant.« less

  5. Stress Testing of Organic Light- Emitting Diode Panels and Luminaires

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, Lynn; Rountree, Kelley; Mills, Karmann

    This report builds on previous DOE efforts with OLED technology by updating information on a previously benchmarked OLED product (the Chalina luminaire from Acuity Brands) and provides new benchmarks on the performance of Brite 2 and Brite Amber OLED panels from OLEDWorks. During the tests described here, samples of these devices were subjected to continuous operation in stress tests at elevated ambient temperature environments of 35°C or 45°C. In addition, samples were also operated continuously at room temperature in a room temperature operational life test (RTOL). One goal of this study was to investigate whether these test conditions can acceleratemore » failure of OLED panels, either through panel shorting or an open circuit in the panel. These stress tests are shown to provide meaningful acceleration of OLED failure modes, and an acceleration factor of 2.6 was calculated at 45°C for some test conditions. In addition, changes in the photometric properties of the emitted light (e.g., luminous flux and chromaticity maintenance) was also evaluated for insights into the long-term stability of these products compared to earlier generations. Because OLEDs are a lighting system, electrical testing was also performed on the panel-driver pairs to provide insights into the impact of the driver on long-term panel performance.« less

  6. A Restrospective and Prospective Examination of NOAA Solar Imaging

    NASA Astrophysics Data System (ADS)

    Hill, S. M.

    2015-12-01

    NOAA has provided soft X-ray imaging of the lower corona since the early 2000's. It is currently building the spacecraft and instrumentation to observe the sun in the extreme ultraviolet (EUV) through 2036. After more than 6 million calibrated images, it is appropriate to examine NOAA data as providing retrospective context for scientific missions. In particular, this presentation examines the record of GOES Solar X-ray Imager (SXI) observations, including continuity, photometric stability and comparison to other contemporary x-ray imagers. The first GOES Solar X-ray Imager was launched in 2001 and entered operations in 2003. The current SXIs will remain in operations until approximately 2020, when a new series of Solar (extreme-)Ultraviolet Imagers (SUVIs) will replace them as the current satellites reach their end of life. In the sense that the SXIs are similar to Yokoh's SXT and Hinode's XRT, the SUVI instruments will be similar to SOHO's EIT and SDO's AIA. The move to narrowband EUV imagers will better support eventual operational estimation of plasma conditions. In particular, plans are to leverage advances in automated image processing and segmentation to assist forecasters. While NOAA's principal use of these observations is real-time space weather forecasting, they will continue to provide a consistent context measurement for researchers for decades to come.

  7. The Mars Exploration Rover Project : 2005 surface operations results

    NASA Technical Reports Server (NTRS)

    Erickson, James K.; Callas, John L.; Haldemann, Albert F. C.

    2005-01-01

    The intent of this paper is to provide the aerospace community a status report of the progress of the Mars Rovers exploration of the Martian surface, picking up after the landings and continuing through fiscal year 2005.

  8. 7 CFR 1703.127 - Application selection provisions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 1703.127 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE RURAL DEVELOPMENT Distance Learning and Telemedicine Grant Program § 1703.127... successful implementation, operation, or sustainability of the project; (3) Other applications would provide...

  9. 7 CFR 1703.127 - Application selection provisions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 1703.127 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE RURAL DEVELOPMENT Distance Learning and Telemedicine Grant Program § 1703.127... successful implementation, operation, or sustainability of the project; (3) Other applications would provide...

  10. 7 CFR 1703.127 - Application selection provisions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 1703.127 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE RURAL DEVELOPMENT Distance Learning and Telemedicine Grant Program § 1703.127... successful implementation, operation, or sustainability of the project; (3) Other applications would provide...

  11. 76 FR 5804 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-02

    .../ operators to submit cost data and provide copies of recent emissions test reports and continuous emission... purposes of the regulatory reviews. The emissions test data (test reports, CEMS data, and CMS data...

  12. Electrical engineering research support for FDOT Traffic Statistics Office

    DOT National Transportation Integrated Search

    2010-03-01

    The aim of this project was to provide electrical engineering support for the telemetered traffic monitoring sites (TTMSs) operated by the Statistics Office of the Florida Department of Transportation. This project was a continuation of project BD-54...

  13. 47 CFR 76.901 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND... basic tier, and any additional video programming signals a service added to the basic tier by the cable operator. (b) Cable programming service. Cable programming service includes any video programming provided...

  14. Addition of acetate improves stability of power generation using microbial fuel cells treating domestic wastewater.

    PubMed

    Stager, Jennifer L; Zhang, Xiaoyuan; Logan, Bruce E

    2017-12-01

    Power generation using microbial fuel cells (MFCs) must provide stable, continuous conversion of organic matter in wastewaters into electricity. However, when relatively small diameter (0.8cm) graphite fiber brush anodes were placed close to the cathodes in MFCs, power generation was unstable during treatment of low strength domestic wastewater. One reactor produced 149mW/m 2 before power generation failed, while the other reactor produced 257mW/m 2 , with both reactors exhibiting severe power overshoot in polarization tests. Using separators or activated carbon cathodes did not result in stable operation as the reactors continued to exhibit power overshoot based on polarization tests. However, adding acetate (1g/L) to the wastewater produced stable performance during fed batch and continuous flow operation, and there was no power overshoot in polarization tests. These results highlight the importance of wastewater strength and brush anode size for producing stable and continuous power in compact MFCs. Copyright © 2017 Elsevier B.V. All rights reserved.

  15. Landsat 8 OLI radiometric calibration performance after three years (Conference Presentation)

    NASA Astrophysics Data System (ADS)

    Morfitt, Ron A.

    2016-09-01

    The Landsat 8 Operational Land Imager (OLI) impressed science users soon after launch in early 2013 with both its radiometric and geometric performance. After three years on-orbit, OLI continues to exceed expectations with its high signal-to-noise ratio, low striping, and stable response. The few artifacts that do exist, such as ghosting, continue to be minimal and show no signs of increasing. The on-board calibration sources showed a small decrease in response during the first six months of operations in the coastal aerosol band, but that decrease has stabilized to less than a half percent per year since that time. The other eight bands exhibit very little change over the past three years and have remained well within a half percent of their initial response to all on-board calibration sources. Analysis of lunar acquisitions also agree with the on-board calibrators. Overall, the OLI on-board the Landsat 8 spacecraft continues to provide exceptional measurements of the Earth's surface to continue the long tradition of Landsat.

  16. The DoD's High Performance Computing Modernization Program - Ensuing the National Earth Systems Prediction Capability Becomes Operational

    NASA Astrophysics Data System (ADS)

    Burnett, W.

    2016-12-01

    The Department of Defense's (DoD) High Performance Computing Modernization Program (HPCMP) provides high performance computing to address the most significant challenges in computational resources, software application support and nationwide research and engineering networks. Today, the HPCMP has a critical role in ensuring the National Earth System Prediction Capability (N-ESPC) achieves initial operational status in 2019. A 2015 study commissioned by the HPCMP found that N-ESPC computational requirements will exceed interconnect bandwidth capacity due to the additional load from data assimilation and passing connecting data between ensemble codes. Memory bandwidth and I/O bandwidth will continue to be significant bottlenecks for the Navy's Hybrid Coordinate Ocean Model (HYCOM) scalability - by far the major driver of computing resource requirements in the N-ESPC. The study also found that few of the N-ESPC model developers have detailed plans to ensure their respective codes scale through 2024. Three HPCMP initiatives are designed to directly address and support these issues: Productivity Enhancement, Technology, Transfer and Training (PETTT), the HPCMP Applications Software Initiative (HASI), and Frontier Projects. PETTT supports code conversion by providing assistance, expertise and training in scalable and high-end computing architectures. HASI addresses the continuing need for modern application software that executes effectively and efficiently on next-generation high-performance computers. Frontier Projects enable research and development that could not be achieved using typical HPCMP resources by providing multi-disciplinary teams access to exceptional amounts of high performance computing resources. Finally, the Navy's DoD Supercomputing Resource Center (DSRC) currently operates a 6 Petabyte system, of which Naval Oceanography receives 15% of operational computational system use, or approximately 1 Petabyte of the processing capability. The DSRC will provide the DoD with future computing assets to initially operate the N-ESPC in 2019. This talk will further describe how DoD's HPCMP will ensure N-ESPC becomes operational, efficiently and effectively, using next-generation high performance computing.

  17. Successful operation of continuous reactors at short retention times results in high-density, fast-rate Dehalococcoides dechlorinating cultures.

    PubMed

    Delgado, Anca G; Fajardo-Williams, Devyn; Popat, Sudeep C; Torres, César I; Krajmalnik-Brown, Rosa

    2014-03-01

    The discovery of Dehalococcoides mccartyi reducing perchloroethene and trichloroethene (TCE) to ethene was a key landmark for bioremediation applications at contaminated sites. D. mccartyi-containing cultures are typically grown in batch-fed reactors. On the other hand, continuous cultivation of these microorganisms has been described only at long hydraulic retention times (HRTs). We report the cultivation of a representative D. mccartyi-containing culture in continuous stirred-tank reactors (CSTRs) at a short, 3-d HRT, using TCE as the electron acceptor. We successfully operated 3-d HRT CSTRs for up to 120 days and observed sustained dechlorination of TCE at influent concentrations of 1 and 2 mM TCE to ≥ 97 % ethene, coupled to the production of 10(12) D. mccartyi cells Lculture (-1). These outcomes were possible in part by using a medium with low bicarbonate concentrations (5 mM) to minimize the excessive proliferation of microorganisms that use bicarbonate as an electron acceptor and compete with D. mccartyi for H2. The maximum conversion rates for the CSTR-produced culture were 0.13 ± 0.016, 0.06 ± 0.018, and 0.02 ± 0.007 mmol Cl(-) Lculture (-1) h(-1), respectively, for TCE, cis-dichloroethene, and vinyl chloride. The CSTR operation described here provides the fastest laboratory cultivation rate of high-cell density Dehalococcoides cultures reported in the literature to date. This cultivation method provides a fundamental scientific platform for potential future operations of such a system at larger scales.

  18. Comparing military and civilian critical thinking and information processes in operational risk management: what are the lessons?

    PubMed

    VanVactor, Jerry D; Gill, Tony

    2010-03-01

    Business continuity has expanded into a discipline that spans most functional areas of large enterprises. Both the military and financial sectors have consistently demonstrated an aptitude to expand the boundaries of continuity planning and crisis mitigation. A comparison of both enterprises is provided to see how their respective methodologies compare. Interestingly, the similarities far outweigh the differences. The paper provides commentary related to comparative insight from risk practitioners' perspectives from within the US Army, one of the largest military organisations in the world, and the Bank of Montreal, one of Canada's leading financial institutions.

  19. Application impact analysis: a risk-based approach to business continuity and disaster recovery.

    PubMed

    Epstein, Beth; Khan, Dawn Christine

    2014-01-01

    There are many possible disruptions that can occur in business. Overlooking or under planning for Business Continuity requires time, understanding and careful planning. Business Continuity Management is far more than producing a document and declaring business continuity success. What is the recipe for businesses to achieve continuity management success? Application Impact Analysis is a method for understanding the unique Business Attributes. This AIA Cycle involves a risk based approach to understanding the business priority and considering business aspects such as Financial, Operational, Service Structure, Contractual Legal, and Brand. The output of this analysis provides a construct for viewing data, evaluating impact, and delivering results, for an approved valuation of Recovery Time Objectives (RTO).

  20. Dispatchable hydrogen production at the forecourt for electricity grid balancing

    NASA Astrophysics Data System (ADS)

    Rahil, Abdulla; Gammon, Rupert; Brown, Neil

    2017-02-01

    The rapid growth of renewable energy (RE) generation and its integration into electricity grids has been motivated by environmental issues and the depletion of fossil fuels. For the same reasons, an alternative to hydrocarbon fuels is needed for vehicles; hence the anticipated uptake of electric and fuel cell vehicles. High penetrations of RE generators with variable and intermittent output threaten to destabilise electricity networks by reducing the ability to balance electricity supply and demand. This can be greatly mitigated by the use of energy storage and demand-side response (DSR) techniques. Hydrogen production by electrolysis is a promising option for providing DSR as well as an emission-free vehicle fuel. Tariff structures can be used to incentivise the operating of electrolysers as controllable (dispatchable) loads. This paper compares the cost of hydrogen production by electrolysis at garage forecourts under both dispatchable and continuous operation, while ensuring no interruption of fuel supply to fuel cell vehicles. An optimisation algorithm is applied to investigate a hydrogen refueling station in both dispatchable and continuous operation. Three scenarios are tested to see whether a reduced off-peak electricity price could lower the cost of electrolytic hydrogen. These scenarios are: 1) "Standard Continuous", where the electrolyser is operated continuously on a standard all-day tariff of 12p/kWh; 2) "Off-peak Only", where it runs only during off-peak periods in a 2-tier tariff system at the lower price of 5p/kWh; and 3) "2-Tier Continuous", operating continuously and paying a low tariff at off- peak times and a high tariff at other times. This study uses the Libyan coastal city of Derna as a case study. The cheapest electricity cost per kg of hydrogen produced was £2.8, which occurred in Scenario 2. The next cheapest, at £5.8 - £6.3, was in Scenario 3, and the most expensive was £6.8/kg in Scenario 1.

  1. An EXPRESS Rack Overview and Support for Microgravity Research on the International Space Station (ISS)

    NASA Technical Reports Server (NTRS)

    Pelfrey, Joseph J.; Jordan, Lee P.

    2008-01-01

    The EXpedite the PRocessing of Experiments to Space Station or EXPRESS Rack System has provided accommodations and facilitated operations for microgravity-based research payloads for over 6 years on the International Space Station (ISS). The EXPRESS Rack accepts Space Shuttle middeck type lockers and International Subrack Interface Standard (ISIS) drawers, providing a modular-type interface on the ISS. The EXPRESS Rack provides 28Vdc power, Ethernet and RS-422 data interfaces, thermal conditioning, vacuum exhaust, and Nitrogen supply for payload use. The EXPRESS Rack system also includes payload checkout capability with a flight rack or flight rack emulator prior to launch, providing a high degree of confidence in successful operations once an-orbit. In addition, EXPRESS trainer racks are provided to support crew training of both rack systems and subrack operations. Standard hardware and software interfaces provided by the EXPRESS Rack simplify the integration processes for ISS payload development. The EXPRESS Rack is designed to accommodate multidiscipline research, allowing for the independent operation of each subrack payload within a single rack. On-orbit operations began for the EXPRESS Rack Project on April 24, 2001, with one rack operating continuously to support high-priority payloads. The other on-orbit EXPRESS Racks operate based on payload need and resource availability. Over 50 multi-discipline payloads have now been supported on-orbit by the EXPRESS Rack Program. Sustaining engineering, logistics, and maintenance functions are in place to maintain hardware, operations and provide software upgrades. Additional EXPRESS Racks are planned for launch prior to ISS completion in support of long-term operations and the planned transition of the U.S. Segment to a National Laboratory.

  2. Continuous, data-rich appraisal of surgical trainees' operative abilities: a novel approach for measuring performance and providing feedback.

    PubMed

    Roach, Paul B; Roggin, Kevin K; Selkov, Gene; Posner, Mitchell C; Silverstein, Jonathan C

    2009-01-01

    We developed a convenient mechanism, Surgical Training and Assessment Tool (STAT), to accomplish detailed, continuous analysis of surgical trainees' operative abilities, and a simple method, Quality Based Surgical Training (QBST) for implementing it. Using a web-accessed computer program, attending physicians and trainees independently assessed the trainee's operative performance after every operative (training) case. Global attributes of surgical knowledge, skill, and independence were assessed as well as the key technical maneuvers of each operation. A system of hierarchical, expandable menus specific to each of hundreds of different surgical procedures allowed the assessments to be made as detailed or as general as the users felt were necessary. In addition, freehand, unscripted commentary was recorded via an optional "remarks" box feature. Finally, an independently chosen, "overall" grade scaled F through A+ concluded each assessment. Over a 31 month period, 72 different users (52 trainees, 20 attending physicians) submitted 3849 performance assessments on 2424 cases, including 132 different case types and amassing 68,260 distinct data points. The mean number of data points per trainee was 1313; the median time spent per assessment was 60 seconds. Graphic displays allowed formative review of individual cases in real time, and summative review of long term trends. Appraisals of knowledge, skill, and independence were strongly correlated with and independently predictive of the overall competency grade (model r(2) = 0.68; test of predictive significance p < 0.001 for each rating). Trainee and attending physician scores were highly correlated (> 0.7) with one another. QBST/STAT achieves detailed, continuous analysis of surgical trainees' operative abilities, and facilitates timely, specific, and thorough feedback regarding their performance in theater. QBST/STAT promotes trainee self-reflection and generation of continuous, transparent, iterative training goals.

  3. Business continuity management in emerging markets: the case of Jordan.

    PubMed

    Sawalha, Ihab H; Anchor, John R

    2012-01-01

    Despite their considerable growth in last few decades, emerging markets (EM) face numerous risks that have the potential to slow down or obstruct their development. Three main issues are discussed in this paper: first, the risks facing organisations operating in emerging markets and Jordan in particular; secondly, the role of business continuity management (BCM) in emerging markets; and thirdly, potential factors that underpin the role of BCM in emerging markets. These issues are significant, as they represent the role of BCM in highly dynamic and fast changing business environments. The paper provides a discussion of the significance of BCM in reducing or preventing risks facing organisations operating in emerging markets, especially those in Jordan.

  4. A Mock UF6 Feed and Withdrawal System for Testing Safeguards Monitoring Systems and Strategies Intended for Nuclear Fuel Enrichment and Processing Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krichinsky, Alan M; Bates, Bruce E; Chesser, Joel B

    2009-12-01

    This report describes an engineering-scale, mock UF6 feed and withdrawal (F&W) system, its operation, and its intended uses. This system has been assembled to provide a test bed for evaluating and demonstrating new methodologies that can be used in remote, unattended, continuous monitoring of nuclear material process operations. These measures are being investigated to provide independent inspectors improved assurance that operations are being conducted within declared parameters, and to increase the overall effectiveness of safeguarding nuclear material. Testing applicable technologies on a mock F&W system, which uses water as a surrogate for UF6, enables thorough and cost-effective investigation of hardware,more » software, and operational strategies before their direct installation in an industrial nuclear material processing environment. Electronic scales used for continuous load-cell monitoring also are described as part of the basic mock F&W system description. Continuous monitoring components on the mock F&W system are linked to a data aggregation computer by a local network, which also is depicted. Data collection and storage systems are described only briefly in this report. The mock UF{sub 6} F&W system is economical to operate. It uses a simple process involving only a surge tank between feed tanks and product and withdrawal (or waste) tanks. The system uses water as the transfer fluid, thereby avoiding the use of hazardous UF{sub 6}. The system is not tethered to an operating industrial process involving nuclear materials, thereby allowing scenarios (e.g., material diversion) that cannot be conducted otherwise. These features facilitate conducting experiments that yield meaningful results with a minimum of expenditure and quick turnaround time. Technologies demonstrated on the engineering-scale system lead to field trials (described briefly in this report) for determining implementation issues and performance of the monitoring technologies under plant operating conditions. The ultimate use of technologies tested on the engineering-scale test bed is to work with safeguards agencies to install them in operating plants (e.g., enrichment and fuel processing plants), thereby promoting new safeguards measures with minimal impact to operating plants. In addition, this system is useful in identifying features for new plants that can be incorporated as part of 'safeguards by design,' in which load cells and other monitoring technologies are specified to provide outputs for automated monitoring and inspector evaluation.« less

  5. Internet Based Remote Operations

    NASA Technical Reports Server (NTRS)

    Chamberlain, James

    1999-01-01

    This is the Final Report for the Internet Based Remote Operations Contract, has performed payload operations research support tasks March 1999 through September 1999. These tasks support the GSD goal of developing a secure, inexpensive data, voice, and video mission communications capability between remote payload investigators and the NASA payload operations team in the International Space Station (ISS) era. AZTek has provided feedback from the NASA payload community by utilizing its extensive payload development and operations experience to test and evaluate remote payload operations systems. AZTek has focused on use of the "public Internet" and inexpensive, Commercial-off-the-shelf (COTS) Internet-based tools that would most benefit "small" (e.g., $2 Million or less) payloads and small developers without permanent remote operations facilities. Such projects have limited budgets to support installation and development of high-speed dedicated communications links and high-end, custom ground support equipment and software. The primary conclusions of the study are as follows: (1) The trend of using Internet technology for "live" collaborative applications such as telescience will continue. The GSD-developed data and voice capabilities continued to work well over the "public" Internet during this period. 2. Transmitting multiple voice streams from a voice-conferencing server to a client PC to be mixed and played on the PC is feasible. 3. There are two classes of voice vendors in the market: - Large traditional phone equipment vendors pursuing integration of PSTN with Internet, and Small Internet startups.The key to selecting a vendor will be to find a company sufficiently large and established to provide a base voice-conferencing software product line for the next several years.

  6. Novel symmetries in N=2 supersymmetric quantum mechanical models

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Malik, R.P., E-mail: malik@bhu.ac.in; DST-CIMS, Faculty of Science, BHU-Varanasi-221 005; Khare, Avinash, E-mail: khare@iiserpune.ac.in

    We demonstrate the existence of a novel set of discrete symmetries in the context of the N=2 supersymmetric (SUSY) quantum mechanical model with a potential function f(x) that is a generalization of the potential of the 1D SUSY harmonic oscillator. We perform the same exercise for the motion of a charged particle in the X–Y plane under the influence of a magnetic field in the Z-direction. We derive the underlying algebra of the existing continuous symmetry transformations (and corresponding conserved charges) and establish its relevance to the algebraic structures of the de Rham cohomological operators of differential geometry. We showmore » that the discrete symmetry transformations of our present general theories correspond to the Hodge duality operation. Ultimately, we conjecture that any arbitrary N=2 SUSY quantum mechanical system can be shown to be a tractable model for the Hodge theory. -- Highlights: •Discrete symmetries of two completely different kinds of N=2 supersymmetric quantum mechanical models have been discussed. •The discrete symmetries provide physical realizations of Hodge duality. •The continuous symmetries provide the physical realizations of de Rham cohomological operators. •Our work sheds a new light on the meaning of the above abstract operators.« less

  7. 13 CFR 124.603 - What reports regarding the continued business operations of former Participants does SBA require?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... continued business operations of former Participants does SBA require? 124.603 Section 124.603 Business... What reports regarding the continued business operations of former Participants does SBA require... continued business operations, contracts, and financial condition for a period of three years following the...

  8. Risk analysis theory applied to fishing operations: A new approach on the decision-making problem

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cunha, J.C.S.

    1994-12-31

    In the past the decisions concerning whether to continue or interrupt a fishing operation were based primarily on the operator`s previous experience. This procedure often led to wrong decisions and unnecessary loss of money and time. This paper describes a decision-making method based on risk analysis theory and previous operation results from a field under study. The method leads to more accurate decisions on a daily basis allowing the operator to verify each day of the operation if the decision being carried out is the one with the highest probability to conduct to the best economical result. An example ofmore » the method application is provided at the end of the paper.« less

  9. Measured performance of filtration and ventilation systems for fine and ultrafine particles and ozone in an unoccupied modern California house.

    PubMed

    Singer, B C; Delp, W W; Black, D R; Walker, I S

    2017-07-01

    This study evaluated nine ventilation and filtration systems in an unoccupied 2006 house located 250 m downwind of the I-80 freeway in Sacramento, California. Systems were evaluated for reducing indoor concentrations of outdoor particles in summer and fall/winter, ozone in summer, and particles from stir-fry cooking. Air exchange rate was measured continuously. Energy use was estimated for year-round operation in California. Exhaust ventilation without enhanced filtration provided indoor PM 2.5 that was 70% lower than outdoors. Supply ventilation with MERV13 filtration provided slightly less protection, whereas supply MERV16 filtration reduced PM 2.5 by 97-98% relative to outdoors. Supply filtration systems used little energy but provided no benefits for indoor-generated particles. Systems with MERV13-16 filter in the recirculating heating and cooling unit (FAU) operating continuously or 20 min/h reduced PM 2.5 by 93-98%. Across all systems, removal percentages were higher for ultrafine particles and lower for black carbon, relative to PM 2.5 . Indoor ozone was 3-4% of outdoors for all systems except an electronic air cleaner that produced ozone. Filtration via the FAU or portable filtration units lowered PM 2.5 by 25-75% when operated over the hour following cooking. The energy for year-round operation of FAU filtration with an efficient blower motor was estimated at 600 kWh/year. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  10. Measured performance of filtration and ventilation systems for fine and ultrafine particles and ozone in an unoccupied modern California house

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Singer, B. C.; Delp, W. W.; Black, D. R.

    This study evaluated nine ventilation and filtration systems in an unoccupied 2006 house located 250 m downwind of the I-80 freeway in Sacramento, California. Systems were evaluated for reducing indoor concentrations of outdoor particles in summer and fall/winter, ozone in summer, and particles from stir-fry cooking. Air exchange rate was measured continuously. Energy use was estimated for year-round operation in California. Exhaust ventilation without enhanced filtration provided indoor PM 2.5 that was 70% lower than outdoors. Supply ventilation with MERV13 filtration provided slightly less protection, whereas supply MERV16 filtration reduced PM 2.5 by 97-98% relative to outdoors. Supply filtration systems usedmore » little energy but provided no benefits for indoor-generated particles. Systems with MERV13-16 fil ter in the recirculating heating and cooling unit (FAU) operating continuously or 20 min/h reduced PM 2.5 by 93-98%. Across all systems, removal percentages were higher for ultrafine particles and lower for black carbon, relative to PM 2.5 . Indoor ozone was 3-4% of outdoors for all systems except an electronic air cleaner that produced ozone. Filtration via the FAU or portable filtration units lowered PM 2.5 by 25-75% when operated over the hour following cooking. The energy for year-round operation of FAU filtration with an efficient blower motor was estimated at 600 kWh/year.« less

  11. Measured performance of filtration and ventilation systems for fine and ultrafine particles and ozone in an unoccupied modern California house

    DOE PAGES

    Singer, B. C.; Delp, W. W.; Black, D. R.; ...

    2016-12-05

    This study evaluated nine ventilation and filtration systems in an unoccupied 2006 house located 250 m downwind of the I-80 freeway in Sacramento, California. Systems were evaluated for reducing indoor concentrations of outdoor particles in summer and fall/winter, ozone in summer, and particles from stir-fry cooking. Air exchange rate was measured continuously. Energy use was estimated for year-round operation in California. Exhaust ventilation without enhanced filtration provided indoor PM 2.5 that was 70% lower than outdoors. Supply ventilation with MERV13 filtration provided slightly less protection, whereas supply MERV16 filtration reduced PM 2.5 by 97-98% relative to outdoors. Supply filtration systems usedmore » little energy but provided no benefits for indoor-generated particles. Systems with MERV13-16 fil ter in the recirculating heating and cooling unit (FAU) operating continuously or 20 min/h reduced PM 2.5 by 93-98%. Across all systems, removal percentages were higher for ultrafine particles and lower for black carbon, relative to PM 2.5 . Indoor ozone was 3-4% of outdoors for all systems except an electronic air cleaner that produced ozone. Filtration via the FAU or portable filtration units lowered PM 2.5 by 25-75% when operated over the hour following cooking. The energy for year-round operation of FAU filtration with an efficient blower motor was estimated at 600 kWh/year.« less

  12. Errors in fluid balance with pump control of continuous hemodialysis.

    PubMed

    Roberts, M; Winney, R J

    1992-02-01

    The use of pumps both proximal and distal to the dialyzer during continuous hemodialysis provides control of dialysate and ultrafiltration flow rates, thereby reducing nursing time. However, we had noted unexpected severe extracellular fluid depletion suggesting that errors in pump delivery may be responsible. We measured in vitro the operation of various pumps under conditions similar to continuous hemodialysis. Fluid delivery of peristaltic and roller pumps varied with how the tubing set was inserted in the pump. Piston and peristaltic pumps with dedicated pump segments were more accurate. Pumps should be calibrated and tested under conditions simulating continuous hemodialysis prior to in vivo use.

  13. Teleoperated control system for underground room and pillar mining

    DOEpatents

    Mayercheck, William D.; Kwitowski, August J.; Brautigam, Albert L.; Mueller, Brian K.

    1992-01-01

    A teleoperated mining system is provided for remotely controlling the various machines involved with thin seam mining. A thin seam continuous miner located at a mining face includes a camera mounted thereon and a slave computer for controlling the miner and the camera. A plurality of sensors for relaying information about the miner and the face to the slave computer. A slave computer controlled ventilation sub-system which removes combustible material from the mining face. A haulage sub-system removes material mined by the continuous miner from the mining face to a collection site and is also controlled by the slave computer. A base station, which controls the supply of power and water to the continuous miner, haulage system, and ventilation systems, includes cable/hose handling module for winding or unwinding cables/hoses connected to the miner, an operator control module, and a hydraulic power and air compressor module for supplying air to the miner. An operator controlled host computer housed in the operator control module is connected to the slave computer via a two wire communications line.

  14. Evaluation of an Airborne Spacing Concept to Support Continuous Descent Arrival Operations

    NASA Technical Reports Server (NTRS)

    Murdoch, Jennifer L.; Barmore, Bryan E.; Baxley, Brian T.; Capron, William R.; Abbott, Terence S.

    2009-01-01

    This paper describes a human-in-the-loop experiment of an airborne spacing concept designed to support Continuous Descent Arrival (CDA) operations. The use of CDAs with traditional air traffic control (ATC) techniques may actually reduce an airport's arrival throughput since ATC must provide more airspace around aircraft on CDAs due to the variances in the aircraft trajectories. The intent of airborne self-spacing, where ATC delegates the speed control to the aircraft, is to maintain or even enhance an airport s landing rate during CDA operations by precisely achieving the desired time interval between aircraft at the runway threshold. This paper describes the operational concept along with the supporting airborne spacing tool and the results of a piloted evaluation of this concept, with the focus of the evaluation on pilot acceptability of the concept during off-nominal events. The results of this evaluation show a pilot acceptance of this airborne spacing concept with little negative performance impact over conventional CDAs.

  15. Hybrid Modeling for Testing Intelligent Software for Lunar-Mars Closed Life Support

    NASA Technical Reports Server (NTRS)

    Malin, Jane T.; Nicholson, Leonard S. (Technical Monitor)

    1999-01-01

    Intelligent software is being developed for closed life support systems with biological components, for human exploration of the Moon and Mars. The intelligent software functions include planning/scheduling, reactive discrete control and sequencing, management of continuous control, and fault detection, diagnosis, and management of failures and errors. Four types of modeling information have been essential to system modeling and simulation to develop and test the software and to provide operational model-based what-if analyses: discrete component operational and failure modes; continuous dynamic performance within component modes, modeled qualitatively or quantitatively; configuration of flows and power among components in the system; and operations activities and scenarios. CONFIG, a multi-purpose discrete event simulation tool that integrates all four types of models for use throughout the engineering and operations life cycle, has been used to model components and systems involved in the production and transfer of oxygen and carbon dioxide in a plant-growth chamber and between that chamber and a habitation chamber with physicochemical systems for gas processing.

  16. Fatigue Countermeasures: Alertness Management in Flight Operations

    NASA Technical Reports Server (NTRS)

    Co, E. L.; Rosekind, M. R.; Johnson, J. M.; Weldon, K. J.; Smith, R. M.; Gregory, K. G.; Miller, D. L.; Gander, P. H.; Lebacqz, J. V.; Statler, Irving C. (Technical Monitor)

    1994-01-01

    Since 1980, the NASA Ames Fatigue Countermeasures Program has studied the effects and impact of fatigue on flight operations . Sleep loss and circadian disruption are two of the primary physiological factors that underlie fatigue in flight operations. The Program has developed an array of fatigue countermeasure recommendations that can be used to combat the effects of fatigue and continues to research potential new countermeasures. For example, one such strategy involved a NASA/FAA study on the effects of planned cockpit rest to improve crewmember alertness and performance. Based partly on the study results, the FAA is currently reviewing a proposed Advisory Circular for controlled rest on the flight deck. Since there is no simple answer to the issue of fatigue in aviation, an Education and Training Module has been developed to provide the industry with pertinent information on sleep, circadian rhythms, how flight operations affect these physiological factors, and recommendations for fatigue countermeasures. The Module will be updated as the Program's continued research efforts uncover new information and develop new countermeasure strategies,

  17. Data Center Consolidation: A Step towards Infrastructure Clouds

    NASA Astrophysics Data System (ADS)

    Winter, Markus

    Application service providers face enormous challenges and rising costs in managing and operating a growing number of heterogeneous system and computing landscapes. Limitations of traditional computing environments force IT decision-makers to reorganize computing resources within the data center, as continuous growth leads to an inefficient utilization of the underlying hardware infrastructure. This paper discusses a way for infrastructure providers to improve data center operations based on the findings of a case study on resource utilization of very large business applications and presents an outlook beyond server consolidation endeavors, transforming corporate data centers into compute clouds.

  18. Continuous Improvements to East Coast Abort Landings for Space Shuttle Aborts

    NASA Technical Reports Server (NTRS)

    Butler, Kevin D.

    2003-01-01

    Improvement initiatives in the areas of guidance, flight control, and mission operations provide increased capability for successful East Coast Abort Landings (ECAL). Automating manual crew procedures in the Space Shuttle's onboard guidance allows faster and more precise commanding of flight control parameters needed for successful ECALs. Automation also provides additional capability in areas not possible with manual control. Operational changes in the mission concept allow for the addition of new landing sites and different ascent trajectories that increase the regions of a successful landing. The larger regions of ECAL capability increase the safety of the crew and Orbiter.

  19. 10 CFR 60.71 - Records and reports.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Records... the Energy Reorganization Act. (b) Records of the receipt, handling, and disposition of radioactive waste at a geologic repository operations area shall contain sufficient information to provide a...

  20. 7 CFR 1942.306 - Purposes of grants.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... importance to farmers and rural residents. (10) Create, expand, and operate rural distance learning networks or rural learning programs, that provide educational instruction or job training instruction related...-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED...

  1. 7 CFR 1942.306 - Purposes of grants.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... importance to farmers and rural residents. (10) Create, expand, and operate rural distance learning networks or rural learning programs, that provide educational instruction or job training instruction related...-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED...

  2. 7 CFR 1942.306 - Purposes of grants.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... importance to farmers and rural residents. (10) Create, expand, and operate rural distance learning networks or rural learning programs, that provide educational instruction or job training instruction related...-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED...

  3. Research Needed for a Public Library's Community Information Center

    ERIC Educational Resources Information Center

    Slanker, Barbara O.

    1975-01-01

    Libraries must do some research before trying to establish a community information center. Librarians should consider feasibility, identify the target population, inventory community resources, define information needs, and provide for continuing study while the service is in operation. (LS)

  4. 49 CFR 195.302 - General requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... without pressure testing under this subpart: (1) Any hazardous liquid pipeline whose maximum operating... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pressure Testing § 195.302 General requirements. (a) Except as otherwise provided in this section...

  5. 49 CFR 195.302 - General requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... without pressure testing under this subpart: (1) Any hazardous liquid pipeline whose maximum operating... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pressure Testing § 195.302 General requirements. (a) Except as otherwise provided in this section...

  6. 49 CFR 195.302 - General requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... without pressure testing under this subpart: (1) Any hazardous liquid pipeline whose maximum operating... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pressure Testing § 195.302 General requirements. (a) Except as otherwise provided in this section...

  7. 49 CFR 195.302 - General requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... without pressure testing under this subpart: (1) Any hazardous liquid pipeline whose maximum operating... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pressure Testing § 195.302 General requirements. (a) Except as otherwise provided in this section...

  8. 49 CFR 195.302 - General requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... without pressure testing under this subpart: (1) Any hazardous liquid pipeline whose maximum operating... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pressure Testing § 195.302 General requirements. (a) Except as otherwise provided in this section...

  9. Integrating multiple satellite data for crop monitoring

    USDA-ARS?s Scientific Manuscript database

    Remote sensing provides a valuable data source for detecting crop types, monitoring crop condition and predicting crop yields from space. Routine and continuous remote sensing data are critical for agricultural research and operational applications. Since crop field dimensions tend to be relatively ...

  10. 32 CFR 861.2 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., Department of Defense Commercial Air Transportation Quality and Safety Review Program, charges the Commander... collectively referred to as “air carriers”) providing air transportation and operational support services to... Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE AIRCRAFT DEPARTMENT OF DEFENSE COMMERCIAL AIR...

  11. 7 CFR 1942.306 - Purposes of grants.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED... importance to farmers and rural residents. (10) Create, expand, and operate rural distance learning networks or rural learning programs, that provide educational instruction or job training instruction related...

  12. 47 CFR 76.1607 - Principal headend.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false Principal headend. 76.1607 Section 76.1607 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Notices § 76.1607 Principal headend. A cable operator shall provide written...

  13. 47 CFR 76.1607 - Principal headend.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Principal headend. 76.1607 Section 76.1607 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Notices § 76.1607 Principal headend. A cable operator shall provide written...

  14. 47 CFR 76.1607 - Principal headend.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Principal headend. 76.1607 Section 76.1607 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Notices § 76.1607 Principal headend. A cable operator shall provide written...

  15. 47 CFR 76.1607 - Principal headend.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false Principal headend. 76.1607 Section 76.1607 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Notices § 76.1607 Principal headend. A cable operator shall provide written...

  16. 47 CFR 76.1607 - Principal headend.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Principal headend. 76.1607 Section 76.1607 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Notices § 76.1607 Principal headend. A cable operator shall provide written...

  17. 7 CFR 205.205 - Crop rotation practice standard.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... are applicable to the operation: (a) Maintain or improve soil organic matter content; (b) Provide for... SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) ORGANIC FOODS PRODUCTION ACT PROVISIONS NATIONAL ORGANIC PROGRAM Organic Production and Handling Requirements § 205.205...

  18. 7 CFR 205.205 - Crop rotation practice standard.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... are applicable to the operation: (a) Maintain or improve soil organic matter content; (b) Provide for... SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) ORGANIC FOODS PRODUCTION ACT PROVISIONS NATIONAL ORGANIC PROGRAM Organic Production and Handling Requirements § 205.205...

  19. 7 CFR 205.205 - Crop rotation practice standard.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... are applicable to the operation: (a) Maintain or improve soil organic matter content; (b) Provide for... SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) ORGANIC FOODS PRODUCTION ACT PROVISIONS NATIONAL ORGANIC PROGRAM Organic Production and Handling Requirements § 205.205...

  20. 7 CFR 205.205 - Crop rotation practice standard.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... are applicable to the operation: (a) Maintain or improve soil organic matter content; (b) Provide for... SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) ORGANIC FOODS PRODUCTION ACT PROVISIONS NATIONAL ORGANIC PROGRAM Organic Production and Handling Requirements § 205.205...

  1. Chicago Business Leaders Flex Their Muscles.

    ERIC Educational Resources Information Center

    Hallan, Mary A.

    1992-01-01

    Describes the establishment, achievements, and continued success of the Big Shoulders Fund, through which Chicago's business community assists local Catholic innercity schools. Explains how the program provides operating grants, building improvements, scholarships, teacher training programs, mobile classrooms, and endowment funds for schools…

  2. Integrated Vehicle Health Management (IVHM) Activities at Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Fox, Jack

    2000-01-01

    Integrated Vehicle Health Management (IVHM) goals are to develop and integrate the technologies which can provide a continuous, intelligent, and adaptive health state of a vehicle and use this information to improve safety and reduce the costs of operations.

  3. System-state and operating condition sensitive control method and apparatus for electric power delivery systems

    NASA Technical Reports Server (NTRS)

    Burns, III, William Wesley (Inventor); Wilson, Thomas George (Inventor)

    1978-01-01

    This invention provides a method and apparatus for determining a precise switching sequence for the power switching elements of electric power delivery systems of the on-off switching type and which enables extremely fast transient response, precise regulation and highly stable operation. The control utilizes the values of the power delivery system power handling network components, a desired output characteristic, a system timing parameter, and the externally imposed operating conditions to determine where steady state operations should be in order to yield desired output characteristics for the given system specifications. The actual state of the power delivery system is continuously monitored and compared to a state-space boundary which is derived from the desired equilibrium condition, and from the information obtained from this comparison, the system is moved to the desired equilibrium condition in one cycle of switching control. Since the controller continuously monitors the power delivery system's externally imposed operating conditions, a change in the conditions is immediately sensed and a new equilibrium condition is determined and achieved, again in a single cycle of switching control.

  4. Recent Enhancements to the National Transonic Facility

    NASA Technical Reports Server (NTRS)

    Kilgore, W. A.; Balakrishna, S.; Bobbitt, C. W.; Underwood, P.

    2003-01-01

    The National Transonic Facility continues to make enhancements to provide quality data in a safe, efficient and cost effective method for aerodynamic ground testing. Recent enhancements discussed in this paper include the restoration of reliability and improved performance of the heat exchanger systems resulting in the expansion of the NTF air operations envelope. Additionally, results are presented from a continued effort to reduce model dynamics through the use of a new stiffer balance and sting

  5. LARC powder prepreg system

    NASA Technical Reports Server (NTRS)

    Baucom, Robert M.; Marchello, Joseph M.

    1990-01-01

    Thermoplastic prepregs of LARC-TPI have been produced in a fluidized bed unit on spread continuous fiber tows. The powders are melted on the fibers by radiant heating to adhere the polymer to the fiber. This process produces tow prepreg uniformly without imposing severe stress on the fibers or requiring long high temperature residence times for the polymer. Unit design theory and operating correlations have been developed to provide the basis for scale up to commercial operation. Special features of the operation are the pneumatic tow spreader, fluidized bed and resin feed systems.

  6. The end-stage renal disease industry and exit strategies for nephrologists.

    PubMed

    Sullivan, John D

    2006-01-01

    The purpose of this presentation is to identify exit strategies for nephrologists under changing conditions in the dialysis market. The end-stage renal disease service provider market continues to be highly receptive to consolidation. Taking advantage of large economies of scale, large for-profit dialysis chains have surpassed independent operators in both number of clinics and total patients. With relatively low barriers to entry, new smaller clinics continue to open, serving a niche outside the larger chains. Additional competition comes in the form of medium players funded by venture capitalists with the added pressure of rapid growth and financial return. To ensure market power in both dialysis products and managed care negotiation leverage, medium and large service providers will continue to seek out attractive acquisition targets. For nephrologists to capitalize on investment, clinic and business preparation will continue to be the driving force for these divestitures.

  7. Test Rack Development for Extended Operation of Advanced Stirling Convertors at NASA Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Dugala, Gina M.

    2009-01-01

    The U.S. Department of Energy (DOE), Lockheed Martin Space Company (LMSC), Sun power Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science missions. This generator will make use of free-piston Stirling convertors to achieve higher conversion efficiency than currently available alternatives. NASA GRC's support of ASRG development includes extended operation testing of Advanced Stirling Convertors (ASCs) developed by Sunpower Inc. In the past year, NASA GRC has been building a test facility to support extended operation of a pair of engineering level ASCs. Operation of the convertors in the test facility provides convertor performance data over an extended period of time. Mechanical support hardware, data acquisition software, and an instrumentation rack were developed to prepare the pair of convertors for continuous extended operation. Short-term tests were performed to gather baseline performance data before extended operation was initiated. These tests included workmanship vibration, insulation thermal loss characterization, low-temperature checkout, and fUll-power operation. Hardware and software features are implemented to ensure reliability of support systems. This paper discusses the mechanical support hardware, instrumentation rack, data acquisition software, short-term tests, and safety features designed to support continuous unattended operation of a pair of ASCs.

  8. International Space Weather Initiative (ISWI)

    NASA Technical Reports Server (NTRS)

    Davila, Joseph M.; Gopalswamy, Nat; Thompson, Barbara

    2009-01-01

    The International Heliophysical Year (IHY), an international program of scientific collaboration to understand the external drivers of planetary environments, has come to an end. The IHY was a major international event of great interest to the member States, which involved the deployment of new instrumentation, new observations from the ground and in space, and an education component. We propose to continue the highly successful collaboration between the heliophysics science community and the United Nations Basic Space Science (UNBSS) program. One of the major thrust of the IHY was to deploy arrays of small instruments such as magnetometers, radio antennas, GPS receivers, all-sky cameras, particle detectors, etc. around the world to provide global measurements of heliospheric phenomena. The United Nations Basic Space Science Initiative (UNBSSI) played a major role in this effort. Scientific teams were organized through UNBSS, which consisted of a lead scientist who provided the instruments or fabrication plans for instruments in the array. As a result of the this program, scientists from UNBSS member states now participate in the instrument operation, data collection, analysis, and publication of scientific results, working at the forefront of science research. As part of this project, support for local scientists, facilities and data acquisition is provided by the host nation. In addition, support at the Government level is provided for local scientists to participate. Building on momentum of the IHY, we propose to continue the highly successful collaboration with the UNBSS program to continue the study of universal processes in the solar system that affect the interplanetary and terrestrial environments, and to continue to coordinate the deployment and operation of new and existing instrument arrays aimed at understanding the impacts of Space Weather on Earth and the near-Earth environment. Toward this end, we propose a new program, the International Space Weather Initiative (ISWI).

  9. International Space Weather Initiative (ISWI)

    NASA Technical Reports Server (NTRS)

    Davila, Joseph; Gopalswamy, Nathanial; Thompson, Barbara

    2010-01-01

    The International Heliophysical Year (IHY), an international program of scientific collaboration to understand the external drivers of planetary environments, has come to an end. The IHY was a major international event of great interest to the member States, which involved the deployment of new instrumentation, new observations from the ground and in space, and an education component. We propose to continue the highly successful collaboration between the heliophysics science community and the United Nations Basic Space Science (UNBSS) program. One of the major thrust of the IHY was to deploy arrays of small instruments such as magnetometers, radio antennas, GPS receivers, all-sky cameras, particle detectors, etc. around the world to provide global measurements of heliospheric phenomena. The United Nations Basic Space Science Initiative (UNBSSI) played a major role in this effort. Scientific teams were organized through UNBSS, which consisted of a lead scientist who provided the instruments or fabrication plans for instruments in the array. As a result of the this program, scientists from UNBSS member states now participate in the instrument operation, data collection, analysis, and publication of scientific results, working at the forefront of science research. As part of this project, support for local scientists, facilities and data acquisition is provided by the host nation. In addition, support at the Government level is provided for local scientists to participate. Building on momentum of the IHY, we propose to continue the highly successful collaboration with the UNBSS program to continue the study of universal processes in the solar system that affect the interplanetary and terrestrial environments, and to continue to coordinate the deployment and operation of new and existing instrument arrays aimed at understanding the impacts of Space Weather on Earth and the near-Earth environment. Toward this end, we propose a new program, the International Space Weather Initiative (ISWI).

  10. DEVELOPMENT, INSTALLATION AND OPERATION OF THE MPC&A OPERATIONS MONITORING (MOM) SYSTEM AT THE JOINT INSTITUTE FOR NUCLEAR RESEARCH (JINR) DUBNA, RUSSIA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kartashov,V.V.; Pratt,W.; Romanov, Y.A.

    The Material Protection, Control and Accounting (MPC&A) Operations Monitoring (MOM) systems handling at the International Intergovernmental Organization - Joint Institute for Nuclear Research (JINR) is described in this paper. Category I nuclear material (plutonium and uranium) is used in JINR research reactors, facilities and for scientific and research activities. A monitoring system (MOM) was installed at JINR in April 2003. The system design was based on a vulnerability analysis, which took into account the specifics of the Institute. The design and installation of the MOM system was a collaborative effort between JINR, Brookhaven National Laboratory (BNL) and the U.S. Departmentmore » of Energy (DOE). Financial support was provided by DOE through BNL. The installed MOM system provides facility management with additional assurance that operations involving nuclear material (NM) are correctly followed by the facility personnel. The MOM system also provides additional confidence that the MPC&A systems continue to perform effectively.« less

  11. Continuity of operations/continuity of government for state-level transportation organizations : brief.

    DOT National Transportation Integrated Search

    2011-09-01

    As a result of a federal requirement, all non-federal entities that own or operate critical : infrastructure are required to develop Continuity of Operations/Continuity of Government : (COOP/COG) Plans. Transportation is a critical infrastructure com...

  12. Architecture Study on Telemetry Coverage for Immediate Post-Separation Phase

    NASA Technical Reports Server (NTRS)

    Cheung, Kar-Ming; Lee, Charles H.; Kellogg, Kent H.; Stocklin, Frank J.; Zillig, David J.; Fielhauer, Karl B.

    2008-01-01

    This paper presents the preliminary results of an architecture study that provides continuous telemetry coverage for NASA missions for immediate post-separation phase. This study is a collaboration effort between Jet Propulsion Laboratory (JPL), Goddard Space Flight Center (GSFC), and Applied Physics Laboratory (APL). After launch when the spacecraft separated from the upper stage, the spacecraft typically executes a number of mission-critical operations prior to the deployment of solar panels and the activation of the primary communication subsystem. JPL, GSFC, and APL have similar design principle statements that require continuous coverage of mission-critical telemetry during the immediate post-separation phase. To conform to these design principles, an architecture that consists of a separate spacecraft transmitter and a robust communication network capable of tracking the spacecraft signals is needed.This paper presents the preliminary results of an architecture study that provides continuous telemetry coverage for NASA missions for immediate post-separation phase. This study is a collaboration effort between Jet Propulsion Laboratory (JPL), Goddard Space Flight Center (GSFC), and Applied Physics Laboratory (APL). After launch when the spacecraft separated from the upper stage, the spacecraft typically executes a number of mission-critical operations prior to the deployment of solar panels and the activation of the primary communication subsystem. JPL, GSFC, and APL have similar design principle statements that require continuous coverage of mission-critical telemetry during the immediate post-separation phase. To conform to these design principles, an architecture that consists of a separate spacecraft transmitter and a robust communication network capable of tracking the spacecraft signals is needed. The main results of this study are as follows: 1) At low altitude (< 10000 km) when most post-separation critical operations are executed, Earth-based network (e.g. Deep Space Network (DSN)) can only provide limited coverage, whereas space-based network (e.g. Space Network (SN)) can provide continuous coverage. 2) Commercial-off-the-shelf SN compatible transmitters are available for small satellite applications. In this paper we present the detailed coverage analysis of Earth-based and Space-based networks. We identify the key functional and performance requirements of the architecture, and describe the proposed selection criteria of the spacecraft transmitter. We conclude the paper with a proposed forward plan.

  13. Continuous improvement and TQM in health care: an emerging operational paradigm becomes a strategic imperative.

    PubMed

    Swinehart, K; Green, R F

    1995-01-01

    Argues that US health care is in a state of crisis. Escalating costs account for 13 per cent of GNP, making health care the third largest industry in the USA, and spending is expected to increase. Claims health-care providers need to control rising costs, improve productivity and flexibility, adopt appropriate technologies, and maintain competitive levels of quality and value. States that TQM may provide an environment that will focus on quality of patient care and continuous quality improvement at all levels of the organization including the governing body, the administrative, managerial, and clinical areas. Any new national or state health-care plan will force providers to be more efficient while maintaining quality standards. Concludes that it will be strategically imperative that health-care providers ranging from family physicians to major medical centres and suppliers ranging from laboratories to pharmaceutical firms establish methods for making rapid continuous improvement and total quality management the cornerstone of the strategic planning process.

  14. 40 CFR 60.1275 - What additional requirements must I meet for the operation of my continuous emission monitoring...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring... additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? Use the required span values and applicable performance specifications...

  15. 40 CFR 60.1275 - What additional requirements must I meet for the operation of my continuous emission monitoring...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring... additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? Use the required span values and applicable performance specifications...

  16. Intermittent control: a computational theory of human control.

    PubMed

    Gawthrop, Peter; Loram, Ian; Lakie, Martin; Gollee, Henrik

    2011-02-01

    The paradigm of continuous control using internal models has advanced understanding of human motor control. However, this paradigm ignores some aspects of human control, including intermittent feedback, serial ballistic control, triggered responses and refractory periods. It is shown that event-driven intermittent control provides a framework to explain the behaviour of the human operator under a wider range of conditions than continuous control. Continuous control is included as a special case, but sampling, system matched hold, an intermittent predictor and an event trigger allow serial open-loop trajectories using intermittent feedback. The implementation here may be described as "continuous observation, intermittent action". Beyond explaining unimodal regulation distributions in common with continuous control, these features naturally explain refractoriness and bimodal stabilisation distributions observed in double stimulus tracking experiments and quiet standing, respectively. Moreover, given that human control systems contain significant time delays, a biological-cybernetic rationale favours intermittent over continuous control: intermittent predictive control is computationally less demanding than continuous predictive control. A standard continuous-time predictive control model of the human operator is used as the underlying design method for an event-driven intermittent controller. It is shown that when event thresholds are small and sampling is regular, the intermittent controller can masquerade as the underlying continuous-time controller and thus, under these conditions, the continuous-time and intermittent controller cannot be distinguished. This explains why the intermittent control hypothesis is consistent with the continuous control hypothesis for certain experimental conditions.

  17. Operation Protective Edge - A Unique Challenge for a Civilian EMS Agency.

    PubMed

    Jaffe, Eli; Strugo, Refael; Wacht, Oren

    2015-10-01

    During July through August 2014, Operation Protective Edge, a military conflict between Israel and the Hamas regime in Gaza, dramatically affected both populations. Magen David Adom (MDA), the Israeli national Emergency Medical Service (EMS) and a member of the Red Cross, faced a unique challenge during the conflict: to continue providing crucial service to the entire civilian population of Israel, which was under constant missile threat. This challenge included not only providing immediate care for routine EMS calls under missile threat, but also preparing and delivering immediate care to civilians injured in attacks on major cities, as well as small communities, in Israel. This task is a challenge for a civilian EMS agency that normally operates in a non-military environment, yet, in an instant, must enhance its capability to respond to a considerable threat to its population. During Operation Protective Edge, MDA provided care for 842 wounded civilians and utilized a significant amount of its resources. Providing EMS services for a civilian population in a mixed civilian/military scenario is a challenging task on a national level for an EMS system, especially when the threat lasts for weeks. This report describes MDA's preparedness and operations during Operation Protective Edge, and the unique EMS challenges and dilemmas the agency faced.

  18. Overview of Sentinel-2

    NASA Astrophysics Data System (ADS)

    Fernandez, Valerie; Martimort, Philippe; Spoto, Francois; Sy, Omar; Laberinti, Paolo

    2013-10-01

    GMES is a joint initiative of the European Commission (EC) and the European Space Agency (ESA), designed to establish a European capacity for the provision and use of operational monitoring information for environment and security applications. ESA's role in GMES is to provide the definition and the development of the space- and ground-related system elements. GMES Sentinel-2 mission provides continuity to services relying on multi-spectral highresolution optical observations over global terrestrial surfaces. The key mission objectives for Sentinel-2 are: (1) to provide systematic global acquisitions of high-resolution multi-spectral imagery with a high revisit frequency, (2) to provide enhanced continuity of multi-spectral imagery provided by the SPOT series of satellites, and (3) to provide observations for the next generation of operational products such as landcover maps, land change detection maps, and geophysical variables. Consequently, Sentinel-2 will directly contribute to the Land Monitoring, Emergency Response, and Security services. The corresponding user requirements have driven the design towards a dependable multi-spectral Earthobservation system featuring the MSI with 13 spectral bands spanning from the visible and the near infrared to the short wave infrared. The spatial resolution varies from 10 m to 60 m depending on the spectral band with a 290 km field of view. This unique combination of high spatial resolution, wide field of view and large spectral coverage will represent a major step forward compared to current multi-spectral missions. The mission foresees a series of satellites, each having a 7.25-year lifetime (extendable to 12 years) over a 20-year period starting with the launch of Sentinel-2A foreseen by mid-2014. During full operations two identical satellites will be maintained in the same sun synchronous orbit with a phase delay of 180° providing a revisit time of five days at the equator.

  19. Continuous on-line steam quality monitoring system of the Bacman Geothermal Production Field, Philippines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Solis, R.P.; Chavez, F.C.; Garcia, S.E.

    1997-12-31

    In any operating geothermal power plant, steam quality is one of the most important parameters being monitored. In the Bacon-Manito Geothermal Production Field (BGPF), an online steam quality monitoring system have been installed in two operating power plants which provides an accurate, efficient and continuous real-time data which is more responsive to the various requirements of the field operation. The system utilizes sodium as an indicator of steam purity. Sodium concentration is read by the flame photometer located at the interface after aspirating a sample of the condensed steam through a continuous condensate sampler. The condensate has been degassed throughmore » a condensate-NCG separator. The flame photometer analog signal is then converted by a voltage-to-current converter/transmitter and relayed to the processor which is located at the control center through electrical cable to give a digital sodium concentration read-out at the control panel. The system features a high and high-high sodium level alarm, a continuous strip-chart recorder and a central computer for data capture, retrieval, and processing for further interpretation. Safety devices, such as the flame-off indicator at the control center and the automatic fuel cut-off device along the fuel line, are incorporated in the system.« less

  20. APDS: the autonomous pathogen detection system.

    PubMed

    Hindson, Benjamin J; Makarewicz, Anthony J; Setlur, Ujwal S; Henderer, Bruce D; McBride, Mary T; Dzenitis, John M

    2005-04-15

    We have developed and tested a fully autonomous pathogen detection system (APDS) capable of continuously monitoring the environment for airborne biological threat agents. The system was developed to provide early warning to civilians in the event of a bioterrorism incident and can be used at high profile events for short-term, intensive monitoring or in major public buildings or transportation nodes for long-term monitoring. The APDS is completely automated, offering continuous aerosol sampling, in-line sample preparation fluidics, multiplexed detection and identification immunoassays, and nucleic acid-based polymerase chain reaction (PCR) amplification and detection. Highly multiplexed antibody-based and duplex nucleic acid-based assays are combined to reduce false positives to a very low level, lower reagent costs, and significantly expand the detection capabilities of this biosensor. This article provides an overview of the current design and operation of the APDS. Certain sub-components of the ADPS are described in detail, including the aerosol collector, the automated sample preparation module that performs multiplexed immunoassays with confirmatory PCR, and the data monitoring and communications system. Data obtained from an APDS that operated continuously for 7 days in a major U.S. transportation hub is reported.

  1. Expanding the Reach of Continuing Educational Offerings Through a Web-Based Virtual Network: The Experience of InspireNet.

    PubMed

    Frisch, Noreen C; Atherton, Pat; Borycki, Elizabeth M; Mickelson, Grace; Black, Agnes; Novak Lauscher, Helen; Cordeiro, Jennifer

    2017-01-01

    Virtual platforms using webinars, e-posters, e-newsletters, wikis and blogs connect people who have common interests in new ways. When those individuals are healthcare providers, a professional network that operates on a virtual platform can support their needs for learning, professional development and information currency. The practice of e-learning for continuing professional development is emerging , particularly in nursing where shift work shift inhibits their ability to attend conferences and classes. This article reports the experience of the InspireNet network that provided e-learning models to: 1) provide opportunities for healthcare providers to organize themselves into learning communities through development of electronic communities of practice; 2) support learning on demand; and 3) dramatically increase the reach of educational offerings.

  2. What Color Helmet? Reforming Security Council Peacekeeping Mandates

    DTIC Science & Technology

    1997-08-01

    Security Council mandate may meet the procedural, but not the substantive, requirements of the Charter. Article 2(7) finishes by providing that...established in June 1 99 1 , continues through UNAVEM II I . When UNAVEM I finishe d, Angola requested assistance from the United Nations in implementing...on 27 and 28 October 1 994 . ONUMOZ’s peacekeeping operations actually finished in January 1 995 . 29. UNOSOM I I . The original UN Operation in

  3. Evolving safety practices in the setting of modern complex operating room: role of nurses.

    PubMed

    Niu, L; Li, H Y; Tang, W; Gong, S; Zhang, L J

    2017-01-01

    Operating room (OR) nursing previously referred to patient care provided during the intra-operative phase and the service provided within the OR itself. With the expansion of responsibilities of nurses, OR nursing now includes pre-operative and post-operative periods, therefore peri-operative nursing is accepted as a nursing process in OR in the contemporary medical literature. Peri-operative nurses provide care to the surgical patients during the entire process of surgery. They have several roles including those of manager or a director, clinical practitioner (scrub nurse, circulating nurse and nurse anesthetist), educator as well as researcher. Although, utmost priority is placed on insuring patient safety and well-being, they are also expected to participate in professional organization, continuing medical education programs and participating in research activities. A Surgical Patient Safety Checklist formulated by the World Health Organization serves as a major guideline to all activities in OR, and peri-operative nurses are key personnel in its implementation. Communication among the various players of a procedure in OR is key to successful patient outcome, and peri-operative nurses have a central role in making it happen. Setting up of OR in military conflict zones or places that suffering a widespread natural disaster poses a unique challenge to nursing. This review discusses all aspects of peri-operative nursing and suggests points of improvement in patient care.

  4. Future Supply Chains Enabled by Continuous Processing—Opportunities and Challenges. May 20–21, 2014 Continuous Manufacturing Symposium

    PubMed Central

    Srai, Jagjit Singh; Badman, Clive; Krumme, Markus; Futran, Mauricio; Johnston, Craig

    2015-01-01

    This paper examines the opportunities and challenges facing the pharmaceutical industry in moving to a primarily “continuous processing”-based supply chain. The current predominantly “large batch” and centralized manufacturing system designed for the “blockbuster” drug has driven a slow-paced, inventory heavy operating model that is increasingly regarded as inflexible and unsustainable. Indeed, new markets and the rapidly evolving technology landscape will drive more product variety, shorter product life-cycles, and smaller drug volumes, which will exacerbate an already unsustainable economic model. Future supply chains will be required to enhance affordability and availability for patients and healthcare providers alike despite the increased product complexity. In this more challenging supply scenario, we examine the potential for a more pull driven, near real-time demand-based supply chain, utilizing continuous processing where appropriate as a key element of a more “flow-through” operating model. In this discussion paper on future supply chain models underpinned by developments in the continuous manufacture of pharmaceuticals, we have set out; The significant opportunities to moving to a supply chain flow-through operating model, with substantial opportunities in inventory reduction, lead-time to patient, and radically different product assurance/stability regimes. Scenarios for decentralized production models producing a greater variety of products with enhanced volume flexibility. Production, supply, and value chain footprints that are radically different from today's monolithic and centralized batch manufacturing operations. Clinical trial and drug product development cost savings that support more rapid scale-up and market entry models with early involvement of SC designers within New Product Development. The major supply chain and industrial transformational challenges that need to be addressed. The paper recognizes that although current batch operational performance in pharma is far from optimal and not necessarily an appropriate end-state benchmark for batch technology, the adoption of continuous supply chain operating models underpinned by continuous production processing, as full or hybrid solutions in selected product supply chains, can support industry transformations to deliver right-first-time quality at substantially lower inventory profiles. © 2015 The Authors. Journal of Pharmaceutical Sciences published by Wiley Periodicals, Inc. and the American Pharmacists Association J Pharm Sci 104:840–849, 2015 PMID:25631279

  5. 50 CFR 260.98 - Premises.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Products for Human Consumption Requirements for Plants Operating Under Continuous Inspection on A Contract... immediate vicinity of the buildings or structures that may constitute an attractant, breeding place, or... providing a breeding place for insects or micro-organisms; If the grounds of an official establishment are...

  6. Water Treatment Technology - Flouridation.

    ERIC Educational Resources Information Center

    Ross-Harrington, Melinda; Kincaid, G. David

    One of twelve water treatment technology units, this student manual on flouridation provides instructional materials for three competencies. (The twelve units are designed for a continuing education training course for public water supply operators.) The competencies focus on the following areas: purpose and process of flouridation, correct…

  7. Water Treatment Technology - Filtration.

    ERIC Educational Resources Information Center

    Ross-Harrington, Melinda; Kincaid, G. David

    One of twelve water treatment technology units, this student manual on filtration provides instructional materials for six competencies. (The twelve units are designed for a continuing education training course for public water supply operators.) The competencies focus on the following areas: purposes of sedimentation basins and flocculation…

  8. Water Treatment Technology - Chlorination.

    ERIC Educational Resources Information Center

    Ross-Harrington, Melinda; Kincaid, G. David

    One of twelve water treatment technology units, this student manual on chlorination provides instructional materials for nine competencies. (The twelve units are designed for a continuing education training course for public water supply operators.) The competencies focus on the following areas: purpose and process of chlorination, chlorine…

  9. 49 CFR 605.11 - Exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) That private school bus operators in the urban area are unable to provide adequate transportation, at a... 49 Transportation 7 2010-10-01 2010-10-01 false Exemptions. 605.11 Section 605.11 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF...

  10. Water Treatment Technology - Chemistry/Bacteriology.

    ERIC Educational Resources Information Center

    Ross-Harrington, Melinda; Kincaid, G. David

    One of twelve water treatment technology units, this student manual on chemistry/bacteriology provides instructional materials for twelve competencies. (The twelve units are designed for a continuing education training course for public water supply operators.) The competencies focus on the following areas: waterborne diseases, water sampling…

  11. 46 CFR 113.35-3 - General requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM...-propelled vessel, except as provided in paragraph (d) of this section, must have an electric or mechanical... must be electrically separate and independent, except that a single mechanical operator control device...

  12. 46 CFR 113.35-3 - General requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM...-propelled vessel, except as provided in paragraph (d) of this section, must have an electric or mechanical... must be electrically separate and independent, except that a single mechanical operator control device...

  13. 46 CFR 113.35-3 - General requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM...-propelled vessel, except as provided in paragraph (d) of this section, must have an electric or mechanical... must be electrically separate and independent, except that a single mechanical operator control device...

  14. 46 CFR 113.35-3 - General requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM...-propelled vessel, except as provided in paragraph (d) of this section, must have an electric or mechanical... must be electrically separate and independent, except that a single mechanical operator control device...

  15. 46 CFR 113.35-3 - General requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM...-propelled vessel, except as provided in paragraph (d) of this section, must have an electric or mechanical... must be electrically separate and independent, except that a single mechanical operator control device...

  16. 50 CFR 260.98 - Premises.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Products for Human Consumption Requirements for Plants Operating Under Continuous Inspection on A Contract... immediate vicinity of the buildings or structures that may constitute an attractant, breeding place, or... providing a breeding place for insects or micro-organisms; If the grounds of an official establishment are...

  17. 50 CFR 260.98 - Premises.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Products for Human Consumption Requirements for Plants Operating Under Continuous Inspection on A Contract... immediate vicinity of the buildings or structures that may constitute an attractant, breeding place, or... providing a breeding place for insects or micro-organisms; If the grounds of an official establishment are...

  18. 50 CFR 260.98 - Premises.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Products for Human Consumption Requirements for Plants Operating Under Continuous Inspection on A Contract... immediate vicinity of the buildings or structures that may constitute an attractant, breeding place, or... providing a breeding place for insects or micro-organisms; If the grounds of an official establishment are...

  19. 7 CFR 613.1 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Purpose. 613.1 Section 613.1 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS PLANT MATERIALS CENTERS § 613.1 Purpose. This part provides NRCS policy on...

  20. 42 CFR 422.561 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Definitions. 422.561 Section 422.561 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE... with any aspect of an MA organization's or provider's operations, activities, or behavior, regardless...

  1. 42 CFR 422.561 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 3 2013-10-01 2013-10-01 false Definitions. 422.561 Section 422.561 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE... dissatisfaction with any aspect of an MA organization's or provider's operations, activities, or behavior...

  2. 42 CFR 422.561 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 3 2012-10-01 2012-10-01 false Definitions. 422.561 Section 422.561 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE... dissatisfaction with any aspect of an MA organization's or provider's operations, activities, or behavior...

  3. 47 CFR 22.946 - Service commencement and construction systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... 22.946 Section 22.946 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Cellular Radiotelephone Service § 22.946 Service commencement and... telephone network (PSTN) and must be providing service to mobile stations operated by its subscribers and...

  4. 47 CFR 101.107 - Frequency tolerance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE...-point microwave and stations providing MVDDS. 5 For private operational fixed point-to-point microwave... noted in the table of paragraph (a) of this section. (b) Heterodyne microwave radio systems may be...

  5. 47 CFR 101.107 - Frequency tolerance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE...-point microwave and stations providing MVDDS. 5 For private operational fixed point-to-point microwave... noted in the table of paragraph (a) of this section. (b) Heterodyne microwave radio systems may be...

  6. 47 CFR 101.107 - Frequency tolerance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE...-point microwave and stations providing MVDDS. 5 For private operational fixed point-to-point microwave... noted in the table of paragraph (a) of this section. (b) Heterodyne microwave radio systems may be...

  7. ACTS of Education

    NASA Technical Reports Server (NTRS)

    Bauer, Robert; Krawczyk, Richard; Gargione, Frank; Kruse, Hans; Vrotsos, Pete (Technical Monitor)

    2002-01-01

    Now in its ninth year of operations, the Advanced Communications Technology Satellite (ACTS) program has continued, although since May 2000 in a new operations arrangement involving a university based consortium, the Ohio Consortium for Advanced Communications Technology (OCACT), While NASA has concluded its experimental intentions of ACTS, the spacecraft's ongoing viability has permitted its further operations to provide educational opportunities to engineering and communications students interested in satellite operations, as well as a Ka-band test bed for commercial interests in utilizing Kaband space communications. The consortium has reached its first year of operations. This generous opportunity by NASA has already resulted in unique educational opportunities for students in obtaining "hands-on" experience, such as, in satellite attitude control. An update is presented on the spacecraft and consortium operations.

  8. The Chinese Cardiac Surgery Registry: Design and Data Audit.

    PubMed

    Rao, Chenfei; Zhang, Heng; Gao, Huawei; Zhao, Yan; Yuan, Xin; Hua, Kun; Hu, Shengshou; Zheng, Zhe

    2016-04-01

    In light of the burgeoning volume and certain variation of in-hospital outcomes of cardiac operations in China, a large patient-level registry was needed. We generated the Chinese Cardiac Surgery Registry (CCSR) database in 2013 to benchmark, continuously monitor, and provide feedback of the quality of adult cardiac operations. We report on the design of this database and provide an overview of participating sites and quality of data. We established a network of participating sites with an adult cardiac surgery volume of more than 100 operations per year for continuous web-based registry of in-hospital and follow-up data of coronary artery bypass grafting (CABG) and valve operations. After a routine data quality audit, we report the performance and quality of care back to the participating sites. In total, 87 centers participated and submitted 46,303 surgical procedures from January 2013 to December 2014. The timeliness rates of the short-list and in-hospital data submitted were 73.6% and 70.2%, respectively. The completeness and accuracy rates of the in-hospital data were 97.6% and 95.1%, respectively. We have provided 2 reports for each site and 1 national report regarding the performance of isolated CABG and valve operations. The newly launched CCSR with a national representativeness network and good data quality has the potential to act as an important platform for monitoring and improving cardiac surgical care in mainland China, as well as facilitating research projects, establishing benchmarking standards, and identifying potential areas for quality improvements (ClinicalTrials.gov No. NCT02400125). Copyright © 2016 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  9. Development and Preliminary Results of CTAS on Airline Operational Control Center Operations

    NASA Technical Reports Server (NTRS)

    Zelenka, Richard; Beatty, Roger; Falcone, Richard; Engelland, Shawn; Tobias, Leonard (Technical Monitor)

    1998-01-01

    Continued growth and expansion of air traffic and increased air carrier economic pressures have mandated greater flexibility and collaboration in air traffic management. The ability of airspace users to select their own routes, so called "free-flight", and to more actively manage their fleet operations for maximum economic advantage are receiving great attention. A first step toward greater airspace user and service provider collaboration is information sharing. In this work, arrival scheduling and airspace management data generated by the NASA/FAA Center/TRACON Automation System (CTAS) and used by the FAA service provider is shared with an airline with extensive operations within the CTAS operational domain. The design and development of a specialized airline CTAS "repeater" system is described, as well as some preliminary results of the impact and benefits of this information on the air carrier's operations. FAA controller per aircraft scheduling information, such as that provided by CTAS, has never before been shared in real-time with an airline. Expected airline benefits include improved fleet planning and arrival gate management, more informed "hold-go" decisions, and avoidance of costly aircraft diversions to alternate airports when faced with uncertain airborne arrival delays.

  10. Development and Preliminary Results of CTAS on Airline Operational Control Center Operations

    NASA Technical Reports Server (NTRS)

    Zelenka, Richard; Beatty, Roger; Engelland, Shawn

    2004-01-01

    Continued growth and expansion of air traffic and increased air carrier economic pressures have mandated greater flexibility and collaboration in air traffic management. The ability of airspace users to select their own routes, so called "free-flight", and to more actively manage their fleet operations for maximum economic advantage are receiving great attention. A first step toward greater airspace user and service provider collaboration is information sharing. In this work, arrival scheduling and airspace management data generated by the NASA/FAA Center/TRACON Automation System (CTAS) and used by the FAA service provider is shared with an airline with extensive operations within the CTAS operational domain. The design and development of a specialized airline CTAS "repeater" system is described, as well as some preliminary results of the impact and benefits of this information on the air carrier's operations. FAA controller per aircraft scheduling information, such as that provided by CTAS, has never before been shared in real-time with an airline. Expected airline benefits include improved fleet planning and arrival gate management, more informed "hold-go decisions, and avoidance of costly aircraft diversions to alternate airports when faced with uncertain airborne arrival delays.

  11. GLM Post Launch Testing and Airborne Science Field Campaign

    NASA Astrophysics Data System (ADS)

    Goodman, S. J.; Padula, F.; Koshak, W. J.; Blakeslee, R. J.

    2017-12-01

    The Geostationary Operational Environmental Satellite (GOES-R) series provides the continuity for the existing GOES system currently operating over the Western Hemisphere. The Geostationary Lightning Mapper (GLM) is a wholly new instrument that provides a capability for total lightning detection (cloud and cloud-to-ground flashes). The first satellite in the GOES-R series, now GOES-16, was launched in November 2016 followed by in-orbit post launch testing for approximately 12 months before being placed into operations replacing the GOES-E satellite in December. The GLM will map total lightning continuously throughout day and night with near-uniform spatial resolution of 8 km with a product latency of less than 20 sec over the Americas and adjacent oceanic regions. The total lightning is very useful for identifying hazardous and severe thunderstorms, monitoring storm intensification and tracking evolution. Used in tandem with radar, satellite imagery, and surface observations, total lightning data has great potential to increase lead time for severe storm warnings, improve aviation safety and efficiency, and increase public safety. In this paper we present initial results from the post-launch in-orbit performance testing, airborne science field campaign conducted March-May, 2017 and assessments of the GLM instrument and science products.

  12. Examining maintenance responsibilities.

    PubMed

    Lam, K C

    2001-06-01

    This paper has examined the important responsibilities of the two organisations involved in the provision of maintenance service for the vital building services in many of our highly serviced buildings. The issues raised could be put to beneficial use in both clients and maintenance providers. All in all, the clients should work closely with their maintenance providers. Engineering services in buildings will not perform satisfactorily and efficiently if both parties do not work together and understand the maintenance tasks based on a business partnering mode. Put forward is the view that the management of the activities involved in the operation and maintenance process is a "shared commitment/involvement" between the client and the maintenance provider. It is obvious that many factors can influence the continued effectiveness of a quality maintenance scheme set up by client and provider. Some of these factors are: Change in key personnel Updates in technology Amendments to engineering practice Implementation of legislative requirements Changes in operation by client or provider Change of use of building Passage of time These factors must be fully reviewed by both parties from time to time, and necessary actions taken. A cooperative team working relationship and improved communication should be fostered by the client and his provider for the best management of services maintenance. This arrangement will contribute to better building services systems with continuous improvement; improved value for clients and higher return for the maintenance provider.

  13. Layered virus protection for the operations and administrative messaging system

    NASA Technical Reports Server (NTRS)

    Cortez, R. H.

    2002-01-01

    NASA's Deep Space Network (DSN) is critical in supporting the wide variety of operating and plannedunmanned flight projects. For day-to-day operations it relies on email communication between the three Deep Space Communication Complexes (Canberra, Goldstone, Madrid) and NASA's Jet Propulsion Laboratory. The Operations & Administrative Messaging system, based on the Microsoft Windows NTand Exchange platform, provides the infrastructure that is required for reliable, mission-critical messaging. The reliability of this system, however, is threatened by the proliferation of email viruses that continue to spread at alarming rates. A layered approach to email security has been implemented across the DSN to protect against this threat.

  14. An operational earth resources satellite system: The LANDSAT follow-on program

    NASA Technical Reports Server (NTRS)

    Stroud, W. G.

    1977-01-01

    The LANDSATS 1 and 2 have demonstrated the role of remote sensing from satellite in research, development, and operational activities essential to the better management of our resources. Hundreds of agricultural, geological, hydrological, urban land use, and other investigations have raised the question of the development of an operational system providing continuous, timely data. The LANDSAT Follow-on Study addressed the economics, technological performance, and design of a system in transition from R and D to operations. Economic benefits were identified; and a complete system from sensors to the ultilization in forecasting crop production, oil and mineral exploration, and water resources management was designed.

  15. Eddy Current Flow Measurements in the FFTF

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nielsen, Deborah L.; Polzin, David L.; Omberg, Ronald P.

    2017-02-02

    The Fast Flux Test Facility (FFTF) is the most recent liquid metal reactor (LMR) to be designed, constructed, and operated by the U.S. Department of Energy (DOE). The 400-MWt sodium-cooled, fast-neutron flux reactor plant was designed for irradiation testing of nuclear reactor fuels and materials for liquid metal fast breeder reactors. Following shut down of the Clinch River Breeder Reactor Plant (CRBRP) project in 1983, FFTF continued to play a key role in providing a test bed for demonstrating performance of advanced fuel designs and demonstrating operation, maintenance, and safety of advanced liquid metal reactors. The FFTF Program provides valuablemore » information for potential follow-on reactor projects in the areas of plant system and component design, component fabrication, fuel design and performance, prototype testing, site construction, and reactor control and operations. This report provides HEDL-TC-1344, “ECFM Flow Measurements in the FFTF Using Phase-Sensitive Detectors”, March 1979.« less

  16. Planning in the Continuous Operations Environment of the International Space Station

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa; Hagopian, Jeff

    1996-01-01

    The continuous operation planning approach developed for the operations planning of the International Space Station (ISS) is reported on. The approach was designed to be a robust and cost-effective method. It separates ISS planning into two planning functions: long-range planning for a fixed length planning horizon which continually moves forward as ISS operations progress, and short-range planning which takes a small segment of the long-range plan and develops a detailed operations schedule. The continuous approach is compared with the incremental approach, the short and long-range planning functions are described, and the benefits and challenges of implementing a continuous operations planning approach for the ISS are summarized.

  17. Architecture Study on Telemetry Coverage for Immediate Post-Separation Phase

    NASA Technical Reports Server (NTRS)

    Cheung, Kar-Ming; Lee, Charles; Kellogg, Kent; Stocklin, Frank; Zillig, David; Fielhauer, Karl

    2008-01-01

    This document is the viewgraphs that accompanies a paper that presents the preliminary results of an architecture study that provides continuous telemetry coverage for NASA missions for immediate post-separation phase. After launch when the spacecraft separated from the upper stage, the spacecraft typically executes a number of mission-critical operations prior to the deployment of solar panels and the activation of the primary communication subsystem. JPL, GSFC, and APL have similar design principle statements that require continuous coverage of mission-critical telemetry during the immediate post-separation phase. To conform to these design principles, an architecture that consists of a separate spacecraft transmitter and a robust communication network capable of tracking the spacecraft signals is needed. The main results of this study are as follows: 1) At low altitude (< 10000 km) when most post-separation critical operations are executed, Earth-based network (e.g. Deep Space Network (DSN)) can only provide limited coverage, whereas space-based network (e.g. Space Network (SN)) can provide continuous coverage. 2) Commercial-off-the-shelf SN compatible transmitters are available for small satellite applications. In this paper we present the detailed coverage analysis of Earth-based and Space-based networks. We identify the key functional and performance requirements of the architecture, and describe the proposed selection criteria of the spacecraft transmitter. We conclude the paper with a proposed forward plan.

  18. International Space Station Environmental Control and Life Support System Status: 2009 - 2010

    NASA Technical Reports Server (NTRS)

    Williams, David E.; Dake, Jason R.; Gentry, Gregory J.

    2010-01-01

    The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non -regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between March 2009 and February 2010. The ISS continued permanent crew operations, with the start of Phase 3 of the ISS Assembly Sequence and an increase of the ISS crew size from three to six. Work continues on the last of the Phase 3 pressurized elements.

  19. International Space Station Environmental Control and Life Support System Status: 2009 - 2010

    NASA Technical Reports Server (NTRS)

    Williams, David E.; Dake, Jason R.; Gentry, Gregory J.

    2009-01-01

    The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between March 2009 and February 2010. The ISS continued permanent crew operations, with the start of Phase 3 of the ISS Assembly Sequence and an increase of the ISS crew size from three to six. Work continues on the last of the Phase 3 pressurized elements.

  20. Control Systems Engineering in Continuous Pharmaceutical Manufacturing May 20-21, 2014 Continuous Manufacturing Symposium.

    PubMed

    Myerson, Allan S; Krumme, Markus; Nasr, Moheb; Thomas, Hayden; Braatz, Richard D

    2015-03-01

    This white paper provides a perspective of the challenges, research needs, and future directions for control systems engineering in continuous pharmaceutical processing. The main motivation for writing this paper is to facilitate the development and deployment of control systems technologies so as to ensure quality of the drug product. Although the main focus is on small-molecule pharmaceutical products, most of the same statements apply to biological drug products. An introduction to continuous manufacturing and control systems is followed by a discussion of the current status and technical needs in process monitoring and control, systems integration, and risk analysis. Some key points are that: (1) the desired objective in continuous manufacturing should be the satisfaction of all critical quality attributes (CQAs), not for all variables to operate at steady-state values; (2) the design of start-up and shutdown procedures can significantly affect the economic operation of a continuous manufacturing process; (3) the traceability of material as it moves through the manufacturing facility is an important consideration that can at least in part be addressed using residence time distributions; and (4) the control systems technologies must assure quality in the presence of disturbances, dynamics, uncertainties, nonlinearities, and constraints. Direct measurement, first-principles and empirical model-based predictions, and design space approaches are described for ensuring that CQA specifications are met. Ways are discussed for universities, regulatory bodies, and industry to facilitate working around or through barriers to the development of control systems engineering technologies for continuous drug manufacturing. Industry and regulatory bodies should work with federal agencies to create federal funding mechanisms to attract faculty to this area. Universities should hire faculty interested in developing first-principles models and control systems technologies for drug manufacturing that are easily transportable to industry. Industry can facilitate the move to continuous manufacturing by working with universities on the conception of new continuous pharmaceutical manufacturing process unit operations that have the potential to make major improvements in product quality, controllability, or reduced capital and/or operating costs. Regulatory bodies should ensure that: (1) regulations and regulatory practices promote, and do not derail, the development and implementation of continuous manufacturing and control systems engineering approaches; (2) the individuals who approve specific regulatory filings are sufficiently trained to make good decisions regarding control systems approaches; (3) provide regulatory clarity and eliminate/reduce regulatory risks; (4) financially support the development of high-quality training materials for use of undergraduate students, graduate students, industrial employees, and regulatory staff; (5) enhance the training of their own technical staff by financially supporting joint research projects with universities in the development of continuous pharmaceutical manufacturing processes and the associated control systems engineering theory, numerical algorithms, and software; and (6) strongly encourage the federal agencies that support research to fund these research areas. © 2014 Wiley Periodicals, Inc. and the American Pharmacists Association. © 2014 Wiley Periodicals, Inc. and the American Pharmacists Association.

Top