42 CFR 137.327 - May multiple projects be included in a single construction project agreement?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...
42 CFR 137.332 - On what basis may the Secretary reject a final construction project proposal?
Code of Federal Regulations, 2010 CFR
2010-10-01
... face clearly demonstrates that the construction project cannot be completed as proposed. (b) For construction programs proposed to be included in a construction project agreement, the Secretary may also... construction project proposal? 137.332 Section 137.332 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...
Code of Federal Regulations, 2010 CFR
2010-10-01
... FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and... authority, or public or quasi-public corporation for a project described in paragraph (b) of this section.... (b) Eligible project. A grant under section 1625 may be made only for a construction and/or...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What happens to funds remaining at the conclusion of a cost reimbursement construction project? 137.342 Section 137.342 Public Health PUBLIC HEALTH... remaining at the conclusion of a cost reimbursement construction project? All funds, including contingency...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false Is a Self-Governance Tribe required to submit construction project progress and financial reports for construction project agreements? 137.351 Section 137.351 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false Is a Self-Governance Tribe required to submit construction project progress and financial reports for construction project agreements? 137.351 Section 137.351 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Is a Self-Governance Tribe required to submit construction project progress and financial reports for construction project agreements? 137.351 Section 137.351 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...
Code of Federal Regulations, 2011 CFR
2011-10-01
...-Governance Tribes carry out construction projects without assuming these Federal environmental... 42 Public Health 1 2011-10-01 2011-10-01 false May Self-Governance Tribes carry out construction projects without assuming these Federal environmental responsibilities? 137.291 Section 137.291 Public...
Code of Federal Regulations, 2010 CFR
2010-10-01
... FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and... of the Public Health Service Act for construction and modernization projects designed to: (a) Eliminate or prevent imminent safety hazards as defined by Federal, State or local fire, building, or life...
NASA Astrophysics Data System (ADS)
Shibayeva, Marina; Serebryakova, Yelena; Shalnev, Oleg
2017-10-01
Growing demand to increase the investment volume in modernization and development projects for transport infrastructure define the urgency of the current study. The amount of private sector investments in the field is insufficient to implement the projects for road construction due to their significant capital intensity and long payoff period. The implementation of social significant infrastructure projects on the principles of public-private partnership is one of the key strategic directions of growth for transport facilities. The authors come up with a concept and methodology for modeling the investment and innovation activity in the transport facility construction. Furthermore, there is developed a model to find the balance between public and private sector investments in implementing construction projects for transport infrastructure with involvement of PPP (further - public-private partnership). The suggested concepts aim to improve the efficiency rate of the investment and innovation activity in the field of transport facility construction on the basis of public and private sectors collaboration.
DOT National Transportation Integrated Search
2016-07-01
Approximately 20 percent of the Federal-aid highway program is invested in local public agency (LPA) infrastructure projects, which is a significant portion of total Federal funds allocated to highway construction projects in the United States. In re...
42 CFR 137.352 - What is contained in a construction project progress report?
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false What is contained in a construction project progress report? 137.352 Section 137.352 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of Self-Governance Tribe in...
42 CFR 137.353 - What is contained in a construction project financial report?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What is contained in a construction project financial report? 137.353 Section 137.353 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of Self-Governance Tribe in...
42 CFR 137.352 - What is contained in a construction project progress report?
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false What is contained in a construction project progress report? 137.352 Section 137.352 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of Self-Governance Tribe in...
42 CFR 137.353 - What is contained in a construction project financial report?
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false What is contained in a construction project financial report? 137.353 Section 137.353 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of Self-Governance Tribe in...
42 CFR 137.353 - What is contained in a construction project financial report?
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false What is contained in a construction project financial report? 137.353 Section 137.353 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of Self-Governance Tribe in...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Who assesses environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY...
42 CFR 137.362 - May construction project agreements be amended?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false May construction project agreements be amended? 137... of the Secretary in Establishing and Implementing Construction Project Agreements § 137.362 May construction project agreements be amended? Yes, the Self-Governance Tribe, at its discretion, may request the...
Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method
NASA Astrophysics Data System (ADS)
Alptekin, Orkun; Alptekin, Nesrin
2017-10-01
Selection of the most suitable contractor is an important process in public construction projects. This process is a major decision which may influence the progress and success of a construction project. Improper selection of contractors may lead to problems such as bad quality of work and delay in project duration. Especially in the construction projects of public buildings, the proper choice of contractor is beneficial to the public institution. Public procurement processes have different characteristics in respect to dissimilarities in political, social and economic features of every country. In Turkey, Turkish Public Procurement Law PPL 4734 is the main regulatory law for the procurement of the public buildings. According to the PPL 4734, public construction administrators have to contract with the lowest bidder who has the minimum requirements according to the criteria in prequalification process. Public administrators are not sufficient for selection of the proper contractor because of the restrictive provisions of the PPL 4734. The lowest bid method does not enable public construction administrators to select the most qualified contractor and they have realised the fact that the selection of a contractor based on lowest bid alone is inadequate and may lead to the failure of the project in terms of time delay Eand poor quality standards. In order to evaluate the overall efficiency of a project, it is necessary to identify selection criteria. This study aims to focus on identify importance of other criteria besides lowest bid criterion in contractor selection process of PPL 4734. In this study, a survey was conducted to staff of Department of Construction Works of Eskisehir Osmangazi University. According to TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution) for analysis results, termination of construction work in previous tenders is the most important criterion of 12 determined criteria. The lowest bid criterion is ranked in rank 5.
Highway construction related business impacts : phase 3 effort for the town of Dubois.
DOT National Transportation Integrated Search
2008-03-01
Highway construction projects not only impact the traveling public, but can also impact businesses situated adjacent to the construction project. Even : though construction projects are temporary situations, many businesses worry about the level of i...
Construction project management handbook.
DOT National Transportation Integrated Search
2012-03-01
The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...
Construction project management handbook : September 2009.
DOT National Transportation Integrated Search
2009-09-01
The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...
Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects
NASA Astrophysics Data System (ADS)
Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad
2017-12-01
One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.
42 CFR 137.352 - What is contained in a construction project progress report?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What is contained in a construction project progress report? 137.352 Section 137.352 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE...
42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false What is the typical IHS environmental review process for construction projects? 137.294 Section 137.294 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL...
42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false What is the typical IHS environmental review process for construction projects? 137.294 Section 137.294 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL...
42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false What is the typical IHS environmental review process for construction projects? 137.294 Section 137.294 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL...
Code of Federal Regulations, 2010 CFR
2010-10-01
... must be included in the construction project agreement? The construction project agreement must include..., and (d) An assurance that no action will be taken on the construction phase of the project that would... 42 Public Health 1 2010-10-01 2010-10-01 false What environmental considerations must be included...
24 CFR 941.402 - Project design and construction.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project design and construction... URBAN DEVELOPMENT PUBLIC HOUSING DEVELOPMENT Project Development § 941.402 Project design and.... A PHA may certify that its proposed design and construction plans for the development are in...
41 CFR 102-74.135 - Who selects construction and alteration projects that are to be performed?
Code of Federal Regulations, 2010 CFR
2010-07-01
... and alteration projects that are to be performed? 102-74.135 Section 102-74.135 Public Contracts and... construction and alteration projects that are to be performed? The Administrator of General Services selects construction and alteration projects to be performed. ...
42 CFR 137.367 - May the Secretary issue a stop work order under a construction project agreement?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false May the Secretary issue a stop work order under a construction project agreement? 137.367 Section 137.367 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF...
42 CFR 137.367 - May the Secretary issue a stop work order under a construction project agreement?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false May the Secretary issue a stop work order under a construction project agreement? 137.367 Section 137.367 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false If the Secretary recommends a project for construction, is that a promise of Federal funding? 404.59 Section 404.59 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Can Reclamation provide assistance with the construction of a rural water supply project under this program? 404.12 Section 404.12 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview §...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Can Reclamation provide assistance with the construction of a rural water supply project under this program? 404.12 Section 404.12 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview §...
Code of Federal Regulations, 2010 CFR
2010-07-01
...: public improvements construction and square development. Public improvements construction consists of... configuration, and pedestrian amenities. Square development consists of design and construction of development projects primarily on city blocks, known as squares, within the Development Area. These development...
Code of Federal Regulations, 2014 CFR
2014-07-01
...: public improvements construction and square development. Public improvements construction consists of... configuration, and pedestrian amenities. Square development consists of design and construction of development projects primarily on city blocks, known as squares, within the Development Area. These development...
Code of Federal Regulations, 2012 CFR
2012-07-01
...: public improvements construction and square development. Public improvements construction consists of... configuration, and pedestrian amenities. Square development consists of design and construction of development projects primarily on city blocks, known as squares, within the Development Area. These development...
Code of Federal Regulations, 2011 CFR
2011-07-01
...: public improvements construction and square development. Public improvements construction consists of... configuration, and pedestrian amenities. Square development consists of design and construction of development projects primarily on city blocks, known as squares, within the Development Area. These development...
Using Construction Management for Public and Institutional Facilities.
ERIC Educational Resources Information Center
Public Technology, Inc., Washington, DC.
Construction management has been developed as an alternative to the traditional public building process and seeks to save an owner time and cost primarily through better activity coordination and project management. This report was developed to guide public agencies in their evaluation of construction management for their particular needs. It…
Code of Federal Regulations, 2013 CFR
2013-07-01
...: public improvements construction and square development. Public improvements construction consists of... configuration, and pedestrian amenities. Square development consists of design and construction of development projects primarily on city blocks, known as squares, within the Development Area. These development...
ERIC Educational Resources Information Center
Maryland State Dept. of Education, Baltimore.
Standards established by Maryland public schools for information and communication distribution systems in new construction and renovation projects are detailed. The function of the communications distribution room (CDR) is to house the distribution equipment of the school's communications systems and may contain gateways, tuners, video cassette…
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false Are design and construction projects performed by Self-Governance Tribes under section 509 of the Act [25 U.S.C. 458aaa-8] subject to Federal metric requirements? 137.376 Section 137.376 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Are design and construction projects performed by Self-Governance Tribes under section 509 of the Act [25 U.S.C. 458aaa-8] subject to Federal metric requirements? 137.376 Section 137.376 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false Are design and construction projects performed by Self-Governance Tribes under section 509 of the Act [25 U.S.C. 458aaa-8] subject to Federal metric requirements? 137.376 Section 137.376 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Who will hold title to a rural water project that is constructed following the completion of an appraisal investigation or feasibility study under this program? 404.54 Section 404.54 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR...
Ogunlana, S; Yotsinsak, T; Yisa, S
2001-11-01
Many public and large-scale construction projects in Thailand have been faced with environmental and social conflict problems. The major cause is that project sponsors do not address concerns of the public in a proper manner during EIA study. The Yadana Natural Gas Pipeline (YNGP) project is an example of a project which suffered the effects of public demonstration. A public hearing, one technique of public participation, is a good mechanism to solve conflict problems in a non-violent way which the Thai Government usually adopts to settle conflict in construction projects. In the case of the YNGP, even after the conflict was 'resolved' hostility towards the project was not eliminated, as the opponents were not satisfied with the decision. Therefore, this article examines the hearing on the YNGP project. The study found that it was too late to make any significant changes to the project after the hearing was held, most respondents were not satisfied with the project. In other words, this hearing did not improve their perception of environmental soundness of the project. The study showed that the project's impact on the environment was not properly addressed. The project sponsors did not provide sufficient publicity for the meeting and the stage at which the hearing was conducted. Suggestions are made for improving participation in future hearings.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the construction of a rural water supply project under this program? 404.12 Section 404.12 Public... RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.12 Can Reclamation provide assistance with the construction of a rural water supply project under this program? Reclamation may provide assistance with the...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes carry out construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Nepa Process § 137.291 May Self-Governance Tribes carry out construction projects without assuming these Federal environmental...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...
DOT National Transportation Integrated Search
2015-12-31
Public-private partnerships (PPPs) in transportation infrastructure projects refer to contractual agreements formed : between a public Agency and a private sector entity to allow for greater private sector participation in project : delivery. At the ...
1990-01-01
76,951,000 shall be available for study , planning, design, architect and engineer services, as authorized by law, unless the Secretary of Defense...FROM OTHER APPROPRIATIONS - (NCN-ADD) ( 0) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This is a public private venture project using 10 U.S.C. 2809...FROM OTHER APPROPRIATIONS - - (NDN-ADD) ( 0) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This is a public/private venture project using 10 U.S.C. 2809
Code of Federal Regulations, 2014 CFR
2014-10-01
... to compacts, funding agreements and construction project agreements? 137.220 Section 137.220 Public... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Operational Provisions Federal Tort Claims Act... construction project agreements? Yes, regulations governing FTCA coverage are set out at 25 CFR Part 900...
Code of Federal Regulations, 2010 CFR
2010-10-01
... to compacts, funding agreements and construction project agreements? 137.220 Section 137.220 Public... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Operational Provisions Federal Tort Claims Act... construction project agreements? Yes, regulations governing FTCA coverage are set out at 25 CFR Part 900...
Code of Federal Regulations, 2012 CFR
2012-10-01
... to compacts, funding agreements and construction project agreements? 137.220 Section 137.220 Public... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Operational Provisions Federal Tort Claims Act... construction project agreements? Yes, regulations governing FTCA coverage are set out at 25 CFR Part 900...
Code of Federal Regulations, 2013 CFR
2013-10-01
... to compacts, funding agreements and construction project agreements? 137.220 Section 137.220 Public... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Operational Provisions Federal Tort Claims Act... construction project agreements? Yes, regulations governing FTCA coverage are set out at 25 CFR Part 900...
Code of Federal Regulations, 2011 CFR
2011-10-01
... to compacts, funding agreements and construction project agreements? 137.220 Section 137.220 Public... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Operational Provisions Federal Tort Claims Act... construction project agreements? Yes, regulations governing FTCA coverage are set out at 25 CFR Part 900...
42 CFR 136.110 - Facilities construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... application: (1) Provide its assessment of the environmental impact of the project as called for by section... 42 Public Health 1 2014-10-01 2014-10-01 false Facilities construction. 136.110 Section 136.110 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE...
42 CFR 136.110 - Facilities construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... application: (1) Provide its assessment of the environmental impact of the project as called for by section... 42 Public Health 1 2011-10-01 2011-10-01 false Facilities construction. 136.110 Section 136.110 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE...
42 CFR 136.110 - Facilities construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... application: (1) Provide its assessment of the environmental impact of the project as called for by section... 42 Public Health 1 2013-10-01 2013-10-01 false Facilities construction. 136.110 Section 136.110 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE...
42 CFR 136.110 - Facilities construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... application: (1) Provide its assessment of the environmental impact of the project as called for by section... 42 Public Health 1 2012-10-01 2012-10-01 false Facilities construction. 136.110 Section 136.110 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE...
Public/Private Partnerships for New Construction.
ERIC Educational Resources Information Center
Adams, Matthew C.
1999-01-01
Discusses how colleges can finance new construction projects during lean financial times by employing public/private partnerships in an off-balance sheet financing format. Construction planning of a new school parking deck is used to illustrate the process. Benefits of savings in operating costs, management fees, and other line-item expenses are…
NASA Astrophysics Data System (ADS)
Halil, F. M.; Nasir, N. M.; Shukur, A. S.; Hashim, H.
2018-02-01
Design and Build construction project involved the biggest scale of the cost of investment as compared to the traditional approach. In Design and Build, the client hires a design professional that will design according to the client’s need and specification. This research aim is to explore the concept of partnering implementation practiced in the design and build procurement approach. Therefore, the selection of design professionals such as Contractors and consultants in the project is crucial to ensure the successful project completion on time, cost, and quality. The methodology adopted using quantitative approach. Administration of the questionnaire was distributed to the public client by using postal survey. Outcomes of the results, the public clients agreed that project management capabilities and commitment to budget as a crucial element of partnering from the design professional in design and build construction project.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What does a Self-Governance Tribe do if it wants to..., DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Project Assumption Process § 137.325 What does a Self-Governance Tribe do if it wants to perform a construction project under section...
Public Library Materials Conservation Project.
ERIC Educational Resources Information Center
Lowell, Howard P.
The Massachusetts Public Library Materials Conservation Project was a year-long program sponsored by the Massachusetts Bureau of Library Extension and conducted by the New England document Conservation Center (NEDCC) under a grant from Title I, Library Services and Construction Act. Its purposes were to provide public library administrators,…
LSCA (Library Services and Construction Act, Title I) Special Project Reports, Fiscal Year 1976.
ERIC Educational Resources Information Center
Massachusetts State Board of Library Commissioners, Boston.
This collection of reports provides the objectives, background information, project descriptions, and evaluations for 16 public library programs funded through the Library Services and Construction Act in Massachusetts during FY 1976. The projects reflect the efforts being made by librarians to provide services to segments of their population who…
Constructing a Social Justice Tour: Pedagogy, Race, and Student Learning through Geography
ERIC Educational Resources Information Center
Barnd, Natchee
2016-01-01
This article describes a high-impact learning project that combines geography, history, and ethnic studies. It describes the construction of the course, student outcomes, and the final and publicly presented collaborative project: the Social Justice Tour of Corvallis. Based on work in a small largely white town, this project presents a…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-26
... Expansion Project (TEAM 2012 Project) which involves the construction and operation of interstate natural... decision- making process to determine whether the TEAM 2012 Project is in the public convenience and... from the public and interested agencies on the TEAM 2012 Project. Your input will help the Commission...
ERIC Educational Resources Information Center
MacCabe, Bruce
The Literacy Learning Center Project, a project of the Meriden Public Library (Connecticut), targeted the educationally underserved and functionally illiterate, and involved recruitment, retention, space renovation, coalition building, public awareness, training, basic literacy, collection development, tutoring, computer assisted services, and…
Relevance of Partnering as an Alternative Approach to Management of Construction Projects in Ghana
ERIC Educational Resources Information Center
Ansah, Samuel Kwame; Awere, Eric; Edu-Buandoh, Kobina Badu Micah
2016-01-01
Understandably, clients in both the public and the private sectors in Ghanaian construction industry have become increasingly dissatisfied. What they see is unpredictability and under-performance. What they receive is too often of poor quality, late and over-priced. More often contractors enter the construction project focusing on achieving their…
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Is a Self-Governance Tribe responsible for... SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of Self-Governance Tribe in Establishing and Implementing Construction Project Agreements § 137.350 Is a Self...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false What other alternatives are available for Self... SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.272 What other alternatives are available for Self-Governance Tribes to perform construction projects? Self-Governance Tribes also have the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false What other alternatives are available for Self... SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.272 What other alternatives are available for Self-Governance Tribes to perform construction projects? Self-Governance Tribes also have the...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false What other alternatives are available for Self... SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.272 What other alternatives are available for Self-Governance Tribes to perform construction projects? Self-Governance Tribes also have the...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false What other alternatives are available for Self... SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.272 What other alternatives are available for Self-Governance Tribes to perform construction projects? Self-Governance Tribes also have the...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What other alternatives are available for Self... SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.272 What other alternatives are available for Self-Governance Tribes to perform construction projects? Self-Governance Tribes also have the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-25
...; NASA Glenn Research Center Plum Brook Station Wind Farm Project AGENCY: National Aeronautics and Space... Environmental Impact Statement (EIS) for the NASA GRC Plum Brook Station Wind Farm Project located near Sandusky... obtain public comments on construction and operation of the wind farm. The purpose of constructing and...
Australia's First Public Private Partnership School Project
ERIC Educational Resources Information Center
Ross, Peter
2004-01-01
The design and construction of nine schools has commenced in Australia using a Public Private Partnerships (PPPs) methodology. This is the first project in Australia where social infrastructure has been acquired in this way. The Australian project is being managed by the New South Wales (NSW) State Government through its Department of Education…
ERIC Educational Resources Information Center
Cole, Lucy; Fraser, Ruth
The Columbia County Public Library (Lake City, Florida) conducted a project that involved recruitment, retention, public awareness, training, basic literacy, collection development, tutoring, computer- assisted, other technology, intergenerational/family, and English as a Second Language (ESL) programs. The project served a community of…
2016-12-01
Nonfederal Sponsors Why GAO Did This Study Through its Civil Works program, the Corps designs , constructs, and maintains federal water resources...Public Works United States Senate Dear Mr. Chairman: The U.S. Army Corps of Engineers (Corps) is the world’s largest public engineering, design ...its Civil Works Program, in general, the Corps plans, designs , constructs, operates, and maintains a wide range of water resources projects. Congress
Report of CEC Study Committee on Construction Management.
ERIC Educational Resources Information Center
Consulting Engineers Council of the U.S., Washington, DC.
Changing times place new demands on those involved in the implementation of construction projects. Within a relatively few years, the size and complexity of projects has grown substantially. Environmental and other public and social considerations are increasingly significant. With growing complexity, the requirements for effective project…
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Who will hold title to a rural water project that is constructed following the completion of an appraisal investigation or feasibility study... appraisal investigation or feasibility study under this program? Title to any rural water project planned...
He, Guizhen; Zhang, Lei; Lu, Yonglong
2009-09-01
Large-scale public infrastructure projects have featured in China's modernization course since the early 1980s. During the early stages of China's rapid economic development, public attention focused on the economic and social impact of high-profile construction projects. In recent years, however, we have seen a shift in public concern toward the environmental and ecological effects of such projects, and today governments are required to provide valid environmental impact assessments prior to allowing large-scale construction. The official requirement for the monitoring of environmental conditions has led to an increased number of debates in recent years regarding the effectiveness of Environmental Impact Assessments (EIAs) and Governmental Environmental Audits (GEAs) as environmental safeguards in instances of large-scale construction. Although EIA and GEA are conducted by different institutions and have different goals and enforcement potential, these two practices can be closely related in terms of methodology. This article cites the construction of the Qinghai-Tibet Railway as an instance in which EIA and GEA offer complementary approaches to environmental impact management. This study concludes that the GEA approach can serve as an effective follow-up to the EIA and establishes that the EIA lays a base for conducting future GEAs. The relationship that emerges through a study of the Railway's construction calls for more deliberate institutional arrangements and cooperation if the two practices are to be used in concert to optimal effect.
Report of Library Services and Construction Act Project # 2842, July 1 - December 31, 1967.
ERIC Educational Resources Information Center
Los Angeles Public Library, CA.
In this six month period of the Los Angeles Public Library's project to extend service to the disadvantaged a full time public relations assistant was hired. Attempts were made to evaluate special activities and the Library Administration considered implications of the project for the Library's service program. This document includes reports from…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-10
...The proposed information collection requirement described below will be submitted to the Office of Management and Budget (OMB) for review, as required by the Paperwork Reduction Act. The Department is soliciting public comments on the subject proposal. The 1998 Public Housing Reform Act allowed the Mixed-Finance development of public housing units. This meant that Public Housing Authorities (PHAs) could create public housing projects using public housing grant or capital funds and non-HUD sources of funds, subject to HUD's approval. This Information Collection pertains to the information that HUD collects to perform due diligence in order to approve the mixed-finance development of public housing prior to a financial closing and the start of construction or rehabilitation activities. Applicants describe ownership, the type, size, and number of units, construction schedule, construction and permanent financing, property management, how public housing operating subsidy will be provided to the project and other operation plans. New developments may be made up of a variety of housing types: rental, homeownership, private, subsidized, and public housing. These new communities are built for residents with a wide range of incomes, and are designed to fit into the surrounding community.
ERIC Educational Resources Information Center
Hess, Therese M.
The Martinsburg-Berkeley County Public Library (West Virginia) conducted a project that involved recruitment, retention, coalition building, public awareness, training, basic literacy, collection development, tutoring, computer assisted, other technology, and English as a Second Language (ESL) programs. The project served a three-county community…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-19
...The proposed information collection requirement described below has been submitted to the Office of Management and Budget (OMB) for review, as required by the Paperwork Reduction Act. The Department is soliciting public comments on the subject proposal. The 1998 Public Housing Reform Act allowed the Mixed-Finance development of public housing units. This meant that Public Housing Authorities (PHAs) could create public housing projects using public housing grant or capital funds and non-HUD sources of funds, subject to HUD's approval. This Information Collection pertains to the information that HUD collects to perform due diligence in order to approve the mixed-finance development of public housing prior to a financial closing and the start of construction or rehabilitation activities. Applicants describe ownership, the type, size, and number of units, construction schedule, construction and permanent financing, property management, how public housing operating subsidy will be provided to the project and other operation plans. New developments may be made up of a variety of housing types: rental, homeownership, private, subsidized, and public housing. These new communities are built for residents with a wide range of incomes, and are designed to fit into the surrounding community.
ERIC Educational Resources Information Center
Camp, Gloria S.
The Ouachita Parish Public Library (Louisiana) conducted a project that involved recruitment, coalition building, public awareness, training, basic literacy, collection development, tutoring, technology, and English as a Second Language (ESL) programs. The project served a community of over 200,000 people, and targeted the learning disabled,…
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false How do Self-Governance Tribes assume environmental... Self-Governance Tribes assume environmental responsibilities for construction projects under section 509 of the Act [25 U.S.C. 458aaa-8]? Self-Governance Tribes assume environmental responsibilities by...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false How do Self-Governance Tribes assume environmental... Self-Governance Tribes assume environmental responsibilities for construction projects under section 509 of the Act [25 U.S.C. 458aaa-8]? Self-Governance Tribes assume environmental responsibilities by...
75 FR 13275 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
... Dimmett 208-382- 7400. EIS No. 20100083, Draft EIS, BLM, NV, Amargosa Farm Road Solar Energy Project, Construction and Operation of Two Concentrated Solar Power Plant Facilities, Right-of-Way Application on Public..., Blythe Solar Power Project (09- AFC-6), Application for Right-of Way Grant to Construct and Operate, and...
18 CFR 4.12 - Service of report.
Code of Federal Regulations, 2013 CFR
2013-04-01
... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.12... the State where such project is located. The report will be made available for public inspection at...
18 CFR 4.12 - Service of report.
Code of Federal Regulations, 2014 CFR
2014-04-01
... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.12... the State where such project is located. The report will be made available for public inspection at...
18 CFR 4.12 - Service of report.
Code of Federal Regulations, 2011 CFR
2011-04-01
... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.12... the State where such project is located. The report will be made available for public inspection at...
18 CFR 4.12 - Service of report.
Code of Federal Regulations, 2012 CFR
2012-04-01
... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.12... the State where such project is located. The report will be made available for public inspection at...
Recommendations to Improve Space Projection Models and University Space Usage
ERIC Educational Resources Information Center
Stigall, Sam W.
2007-01-01
In today"s economy, public university administrators need to reflect on current practices for reporting and projecting space requirements to government entities as the cost of constructing new facilities or renovating space rises while income from legislative appropriations diminishes. As stewards of public buildings and funds, institutions…
NASA Astrophysics Data System (ADS)
Nidziy, Elena
2017-10-01
Dependence of the regional economic development from efficiency of financing of the construction of transport infrastructure is analyzed and proved in this article. Effective mechanism for infrastructure projects financing, public and private partnership, is revealed and its concrete forms are formulated. Here is proposed an optimal scenario for financing for the transport infrastructure, which can lead to positive transformations in the economy. Paper considers the advantages and risks of public and private partnership for subjects of contractual relations. At that, components for the assessment of economic effect of the implementation of infrastructure projects were proposed simultaneously with formulation of conditions for minimization risks. Results of the research could be used for solution of persistent problems in the development of transport infrastructure, issues of financial assurance of construction of infrastructure projects at the regional level.
Structural and robustness properties of smart-city transportation networks
NASA Astrophysics Data System (ADS)
Zhang, Zhen-Gang; Ding, Zhuo; Fan, Jing-Fang; Meng, Jun; Ding, Yi-Min; Ye, Fang-Fu; Chen, Xiao-Song
2015-09-01
The concept of smart city gives an excellent resolution to construct and develop modern cities, and also demands infrastructure construction. How to build a safe, stable, and highly efficient public transportation system becomes an important topic in the process of city construction. In this work, we study the structural and robustness properties of transportation networks and their sub-networks. We introduce a complementary network model to study the relevance and complementarity between bus network and subway network. Our numerical results show that the mutual supplement of networks can improve the network robustness. This conclusion provides a theoretical basis for the construction of public traffic networks, and it also supports reasonable operation of managing smart cities. Project supported by the Major Projects of the China National Social Science Fund (Grant No. 11 & ZD154).
ERIC Educational Resources Information Center
Des Enfants, Sherry
This DeKalb County Public Library family literacy project final performance report begins with a section that provides quantitative data on the project. The next section compares actual accomplishments to the following project objectives for fiscal year 1993: (1) to update eight existing literacy collections in branch libraries by the addition of…
18 CFR 4.12 - Service of report.
Code of Federal Regulations, 2010 CFR
2010-04-01
... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.12... the Governor of the State where such project is located. The report will be made available for public...
77 FR 12106 - Kapka Butte Sno-Park Construction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-28
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Kapka Butte Sno-Park Construction... Construction project. SUMMARY: The FHWA is issuing this notice to advise the public that the FHWA is officially designated as the Joint-Lead Agency pursuant to 23 U.S.C. 139(c)(1) for the Kapka Butte Sno-Park Construction...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-18
...-way (ROW) authorization to construct, operate, maintain, and decommission a solar photovoltaic (PV... grant to construct, operate, and decommission a solar PV facility on public lands in compliance with... CACA49491] Notice of Availability of the Draft enXco Desert Harvest Solar Farm Project Environmental Impact...
Code of Federal Regulations, 2012 CFR
2012-10-01
... (excluding Indian Tribes, inter-Tribal consortia, and Tribal organizations) retained by Self-Governance... projects performed by Self-Governance Tribes using Federal funds? 137.379 Section 137.379 Public Health... HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Other § 137.379 Do Davis-Bacon wage rates...
Code of Federal Regulations, 2013 CFR
2013-10-01
... (excluding Indian Tribes, inter-Tribal consortia, and Tribal organizations) retained by Self-Governance... projects performed by Self-Governance Tribes using Federal funds? 137.379 Section 137.379 Public Health... HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Other § 137.379 Do Davis-Bacon wage rates...
Code of Federal Regulations, 2010 CFR
2010-10-01
... (excluding Indian Tribes, inter-Tribal consortia, and Tribal organizations) retained by Self-Governance... projects performed by Self-Governance Tribes using Federal funds? 137.379 Section 137.379 Public Health... HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Other § 137.379 Do Davis-Bacon wage rates...
Code of Federal Regulations, 2014 CFR
2014-10-01
... (excluding Indian Tribes, inter-Tribal consortia, and Tribal organizations) retained by Self-Governance... projects performed by Self-Governance Tribes using Federal funds? 137.379 Section 137.379 Public Health... HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Other § 137.379 Do Davis-Bacon wage rates...
Code of Federal Regulations, 2011 CFR
2011-10-01
... (excluding Indian Tribes, inter-Tribal consortia, and Tribal organizations) retained by Self-Governance... projects performed by Self-Governance Tribes using Federal funds? 137.379 Section 137.379 Public Health... HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Other § 137.379 Do Davis-Bacon wage rates...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false How will a Self-Governance Tribe receive payment... SELF-GOVERNANCE Construction Project Assumption Process § 137.341 How will a Self-Governance Tribe..., advance payments shall be made annually or semiannually, at the Self-Governance Tribe's option. The...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What procedures must the Secretary follow if the... What procedures must the Secretary follow if the Secretary rejects a final construction project... controlling legal authority supporting the rejection; (b) Within 20 days, provide all documents relied on in...
24 CFR 884.222 - Inapplicability of low-rent public housing model lease and grievance procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... housing model lease and grievance procedures. 884.222 Section 884.222 Housing and Urban Development... PAYMENTS PROGRAM, NEW CONSTRUCTION SET-ASIDE FOR SECTION 515 RURAL RENTAL HOUSING PROJECTS Project Development and Operation § 884.222 Inapplicability of low-rent public housing model lease and grievance...
25 CFR 170.436 - How are public hearings for IRR planning and projects funded?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false How are public hearings for IRR planning and projects funded? 170.436 Section 170.436 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads...
Of the identified current and proposed construction projects in which municipal solid waste combustion residues replace traditionally used materials, approximately half are located on landfills or other property controlled by project sponsors, one third are in publicly accessible...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 137.339 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Project Assumption... requirements under other Federal and non-Federal programs? Yes, notwithstanding any other provision of law, all...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-28
... project development is done in accordance with State laws and HUD requirements. The forms are prepared by a general contractor constructing a public housing development under the conventional bid method in... work for project development is done in accordance with State laws and HUD requirements. The forms are...
Environmental Criteria in the Spanish Public Works Procurement Process.
Fuentes-Bargues, José Luis; González-Cruz, Mª Carmen; González-Gaya, Cristina
2017-02-18
Green Public Procurement (GPP) is defined as a process of contracting products, services, and works with the least possible damage to the environment during their life cycle. In order to improve the knowledge about GPP, a study of the use of environmental tendering criteria in the Spanish public construction sector has been performed. The results of this study show that the use of environmental criteria in Spanish public sector construction procurement is low in comparison to a certain group of countries, known as "Green 7", in the European Union. Environmental criteria is the fourth criterion in importance, but its weight in the global of the process is much lower than other criteria such as price, memory of the construction process and the delivery time. National administrations use environmental criteria more frequently because they have more resources and staff training about environmental issues. Environmental criteria are more used in the tendering of civil projects and works whose budget exceeds ten million euro due to the environmental impact of these kind and/or size of projects.
ERIC Educational Resources Information Center
Longview Public Library, WA.
Project Read at the Longview (Washington) Public Library conducted a program to maintain and expand the Family Literacy Center to provide a monitored tutoring site and family outreach program for a minimum of 75 adult learners and 40 tutors. Two projects were involved: (1) Project READ focused on adult learners with a one-on-one tutoring approach;…
DOT National Transportation Integrated Search
2012-03-16
Engaging private investors and entrepreneurs through public-private partnership (PPP) in : constructing and operating transportation facilities has emerged as one of the viable options to : meet the challenges of funding the development and maintenan...
24 CFR 941.306 - Maximum project cost.
Code of Federal Regulations, 2011 CFR
2011-04-01
...) project costs that are subject to the TDC limit (i.e., Housing Construction Costs and Community Renewal... project, the actual project cost is determined based upon the amount of public housing capital assistance... Community Renewal Costs in excess of the TDC limit, as determined under paragraph (b)(2) of this section...
24 CFR 941.306 - Maximum project cost.
Code of Federal Regulations, 2010 CFR
2010-04-01
...) project costs that are subject to the TDC limit (i.e., Housing Construction Costs and Community Renewal... project, the actual project cost is determined based upon the amount of public housing capital assistance... Community Renewal Costs in excess of the TDC limit, as determined under paragraph (b)(2) of this section...
DOT National Transportation Integrated Search
2003-03-19
This website provides information on road construction projects in Virginia. The Dashboard is divided into four sections. The far left hand column is referred to as the Advertisement Section. This column deals with planned projects that are being pre...
DOT National Transportation Integrated Search
2001-10-01
Public agencies across the country are pursuing innovative project delivery methods such as design-build (D-B) and construction manager-at-risk (CM-at-risk) to improve cycle-time performance on projects, and numerous transportation departments are cu...
42 CFR 137.340 - May a Self-Governance Tribe contribute funding to a project?
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false May a Self-Governance Tribe contribute funding to a... Project Assumption Process § 137.340 May a Self-Governance Tribe contribute funding to a project? Yes, the Self-Governance Tribe and the Secretary may jointly fund projects. The construction project agreement...
42 CFR 137.340 - May a Self-Governance Tribe contribute funding to a project?
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false May a Self-Governance Tribe contribute funding to a... Project Assumption Process § 137.340 May a Self-Governance Tribe contribute funding to a project? Yes, the Self-Governance Tribe and the Secretary may jointly fund projects. The construction project agreement...
42 CFR 137.340 - May a Self-Governance Tribe contribute funding to a project?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false May a Self-Governance Tribe contribute funding to a... Project Assumption Process § 137.340 May a Self-Governance Tribe contribute funding to a project? Yes, the Self-Governance Tribe and the Secretary may jointly fund projects. The construction project agreement...
42 CFR 137.340 - May a Self-Governance Tribe contribute funding to a project?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false May a Self-Governance Tribe contribute funding to a... Project Assumption Process § 137.340 May a Self-Governance Tribe contribute funding to a project? Yes, the Self-Governance Tribe and the Secretary may jointly fund projects. The construction project agreement...
Code of Federal Regulations, 2010 CFR
2010-10-01
... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Miscellaneous § 404.54 Who will hold title to a rural water project that is constructed following the completion of an... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Who will hold title to a rural water...
78 FR 61227 - Public Assistance Cost Estimating Format for Large Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-03
... itemized breakdown of construction costs for completing the project. For example, a typical project will... percentage factors. For example, if a Part B percentage factor is 2 percent, the estimator adds 2 percent of... specific to the project scope of work. Examples include concrete strength testing, water quality testing...
ERIC Educational Resources Information Center
Brown, Daniel
This study examines the management and outcome of the public-private partnerships (P3s) school construction project used in the Auguston housing development in Abbotsford, British Columbia to build a traditionally-designed elementary school. The study explored the relationship between the project's major players, the fiscal incentives that drove…
ERIC Educational Resources Information Center
Holtslander, Linda
This final performance report for the Loudoun County Public Library literacy project begins with a section that provides quantitative data. The next section compares actual accomplishments to the major project objective: to create a non-threatening learning environment at the Transitional Housing Center (THC), a residential homeless shelter.…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-24
...; AZA34425] Notice of Segregation of Public Lands for the Proposed Hyder Valley Solar Energy Project in... of up to 2 years. This is for the purpose of processing one solar energy right-of-way (ROW) application submitted by Pacific Solar Investments, LLC, to construct and operate the Hyder Valley Solar...
ERIC Educational Resources Information Center
Drake, Karen; Rodriguez, Leonard
This final performance report for the Chandler Public Library literacy project for fiscal year 1992 begins with a section that provides quantitative data. The next section compares actual accomplishments to the project goal--to improve the quality of life for illiterate, semiliterate, and non-English-speaking citizens by providing a comprehensive…
Environmental Criteria in the Spanish Public Works Procurement Process
Fuentes-Bargues, José Luis; González-Cruz, Mª Carmen; González-Gaya, Cristina
2017-01-01
Green Public Procurement (GPP) is defined as a process of contracting products, services, and works with the least possible damage to the environment during their life cycle. In order to improve the knowledge about GPP, a study of the use of environmental tendering criteria in the Spanish public construction sector has been performed. The results of this study show that the use of environmental criteria in Spanish public sector construction procurement is low in comparison to a certain group of countries, known as “Green 7”, in the European Union. Environmental criteria is the fourth criterion in importance, but its weight in the global of the process is much lower than other criteria such as price, memory of the construction process and the delivery time. National administrations use environmental criteria more frequently because they have more resources and staff training about environmental issues. Environmental criteria are more used in the tendering of civil projects and works whose budget exceeds ten million euro due to the environmental impact of these kind and/or size of projects. PMID:28218706
The new I-64 economic and regional mobility study.
DOT National Transportation Integrated Search
2011-11-01
The Final Report summarizes the 2008 and 2009 Annual Reports of all studys activities conducted during the I-64 Full-closure construction project in the St. Louis, Missouri region. These activities included project communications, public opinions,...
36 CFR 294.23 - Road construction and reconstruction in Idaho Roadless Areas.
Code of Federal Regulations, 2011 CFR
2011-07-01
... safety; (v) Road reconstruction is needed to implement a road safety improvement project on a road... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Road construction and..., DEPARTMENT OF AGRICULTURE SPECIAL AREAS Idaho Roadless Area Management § 294.23 Road construction and...
Liu, Yong; Sun, Chenjunyan; Xia, Bo; Cui, Caiyun; Coffey, Vaughan
2018-06-01
As one of the most popular methods for the treatment of municipal solid waste (MSW), waste-to-energy (WTE) incineration offers effective solutions to deal with the MSW surge and globe energy issues. Nevertheless, the construction of WTE facilities faces considerable and strong opposition from local communities due to the perceived potential risks. The present study aims to understand whether, and how, community engagement improves local residents' public acceptance towards waste-to-energy (WTE) incineration facilities using a questionnaire survey conducted with nearby residents of two selected WTE incineration plants located in Zhejiang province, China. The results of data analysis using Structural Equation Modeling (SEM) reveal that firstly, a lower level of public acceptance exists among local residents of over the age of 35, of lower education levels, living within 3 km from the WTE Plant and from WTE incineration Plants which are under construction. Secondly, the public trust of local government and other authorities was positively associated with the public acceptance of the WTE incineration project, both directly and indirectly based on perceived risk. Thirdly, community engagement can effectively enhance public trust in local government and other authorities related to the WTE incineration project. The findings contribute to the literature on MSW treatment policy-making and potentially hazardous facility siting, by exploring the determinants of public acceptance towards WTE incineration projects. Copyright © 2018 Elsevier Ltd. All rights reserved.
[Public financing of health research in Chile].
Paraje, Guillermo
2010-01-01
In Chile, researchers can apply to public research funds through specific research projects and must compete with other professionals of other disciplines. To perform a critical assessment of the allocation of public funds for health research in Chile by a public institution called CONICYT. A database was constructed with health projects financed by CONICYT, between 2002 and 2006. Projects were classified (according to their titles) in three methodological categories and nine topics. Age, gender and region where the main researcher is based, were also recorded. 768 research projects were analyzed. Biomedical, clinical and public health research projects accounted for 66, 24 and 10% of allocated funds, respectively. Main researchers were female in 31 % of projects, their mean age was 52 years and 76% worked in the Metropolitan region. These results show that some objectives of the National Research System lead by CONICYT, such as using research as a tool for regional development and allocating funds for conditions with a large burden, are not been met.
ERIC Educational Resources Information Center
Warren, Carol E.
The Harlan County Public Library Literacy Project (Kentucky) provided rural-oriented, basic literacy, and oral history programs to a community of 100,000-200,000. The goal of the project was to produce six booklets about local people and issues, to be used as literacy materials in programs with Appalachian students. Students wanted to produce…
Construction Quality Assurance for Federally Funded Local Public Agency Projects
DOT National Transportation Integrated Search
2015-03-01
The purpose of this TechBrief is to summarize a comprehensive investigation of current construction QA practices from both SHA and LPA perspectives undertaken in 2012 and to present recommendations from this analysis. The review included a content an...
Fabulous Facilities: New Constructions and Renovations.
ERIC Educational Resources Information Center
American Libraries, 1997
1997-01-01
Renovation and construction projects in 18 public and academic libraries across the United States are showcased, with 23 photographs illustrating library interiors and exteriors. Discussion centers on architecture, costs, technology infrastructure and equipment, preservation of old facilities, furniture, and library functions. (AEF)
How to Select a Project Delivery Method for School Facilities
ERIC Educational Resources Information Center
Kalina, David
2007-01-01
In this article, the author discusses and explains three project delivery methods that are commonly used today in the United States. The first project delivery method mentioned is the design-bid-build, which is still the predominant method of project delivery for public works and school construction in the United States. The second is the…
Challenges in Construction Over Soft Soil - Case Studies in Malaysia
NASA Astrophysics Data System (ADS)
Mohamad, N. O.; Razali, C. E.; Hadi, A. A. A.; Som, P. P.; Eng, B. C.; Rusli, M. B.; Mohamad, F. R.
2016-07-01
Construction on soft ground area is a great challenge in the field of geotechnical engineering. Many engineering problems in the form of slope instability, bearing capacity failure or excessive settlement could occur either during or after the construction phase due to low shear strength and high compressibility of this soil. As main technical agencies responsible for implementation of development projects for Government of Malaysia, Public Works Department has vast experience in dealing with this problematic soil over the years. This paper discussed and elaborate on the engineering problems encountered in construction projects that have been carried out by PWD, namely Core Facilities Building of Polytechnic Kota Kinabalu in Sabah and Hospital Tengku Ampuan Rahimah Integration Quarters in Klang, Selangor. Instability of the ground during construction works had caused delay and cost overrun in completion of the project in Selangor, whereas occurrence of continuous post construction settlement had affected the integrity and serviceability of the building in Sabah. The causes of failure and proposed rehabilitation work for both projects also will be discussed in brief.
42 CFR 137.301 - How are project and program environmental review costs identified?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false How are project and program environmental review... HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Nepa Process § 137.301 How are project and program environmental review costs identified? (a) The...
42 CFR 137.301 - How are project and program environmental review costs identified?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false How are project and program environmental review... HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Nepa Process § 137.301 How are project and program environmental review costs identified? (a) The...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-24
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Bunker Hill Groundwater Basin, Riverside-Corona...) will prepare a joint EIS/EIR for the proposed Riverside-Corona Feeder Project. The public and agencies... participate in the planning, design, and construction of the Riverside-Corona Feeder Project including: (i) 20...
A toolbox for alleviating traffic congestion and enhancing mobility
DOT National Transportation Integrated Search
1997-01-01
Over 40 years ago, the United States embarked upon the largest public works project in its history--the construction of the Interstate highway system. The urban portions of this system along with the highways and public transportation services develo...
Environmental Assessment Expanded Ponnequin Wind Energy Project Weld County, Colorado
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
1999-03-02
The U.S.Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCO) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. DOE completed an environmental assessment of the original proposed project in August 1997. Since then, the geographic scope and the design of the project changed, necessitating additional review of the projectmore » under the National Environmental Policy Act. The project now calls for the possible construction of up to 48 wind turbines on State and private lands. PSCo and its partners have initiated construction of the project on private land in Weld County, Colorado. A substation, access road and some wind turbines have been installed. However, to date, DOE has not provided any funding for these activities. DOE, through its Commercialization Ventures Program, has solicited applications for financial assistance from state energy offices, in a teaming arrangement with private-sector organizations, for projects that will accelerate the commercialization of emerging renewable energy technologies. The Commercialization Ventures Program was established by the Renewable Energy and Energy Efficiency Technology Competitiveness Act of 1989 (P.L. 101-218) as amended by the Energy Policy Act of 1992 (P.L. 102-486). The Program seeks to assist entry into the marketplace of newly emerging renewable energy technologies, or of innovative applications of existing technologies. In short, an emerging renewable energy technology is one which has already proven viable but which has had little or no operational experience. The Program is managed by the Department of Energy, Office of Energy Efficiency and Renewable Energy. The Federal action triggering the preparation of this EA is the need for DOE to decide whether to release the requested funding to support the construction of the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE's deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program.« less
Synthetic building materials for transport buildings and structures
NASA Astrophysics Data System (ADS)
Gerasimova, Vera
2017-10-01
The most effective building materials account for the highest growth not only in construction of residential and public buildings, but also other capital projects including roadways, bridges, drainage, communications and other engineering projects. Advancement in the technology of more efficient and ecologically responsible insulation materials have been a priority for safety, minimal maintenance and longevity of finished construction projects. The practical use of modern building materials such as insulation, sound reduction and low energy consumption are a benefit in cost and application compared to the use of outdated heavier and labor-intensive materials. The most efficient way for maximizing insolation and sound proofing should be done during the design stages of the project according to existing codes and regulations that are required by Western Government. All methods and materials that are used need to be optimized in order to reach a high durability and low operational and maintenance cost exceeding more than 50 years of the life of the building, whether it is for public, industrial or residential use. Western construction techniques and technologies need to be applied and adapted by the Russian Federation to insure the most productive successful methods are being implemented. The issues of efficient insulation materials are outlined in this article.
Special Issue: Productive Employment for the Poor.
ERIC Educational Resources Information Center
Gaude, Jacques, Ed.; Miller, Steven, Ed.
1992-01-01
This special issue contains nine articles on labor-intensive public works, social investment funds, rural infrastructure projects, grassroots socioeconomic rights, remuneration systems for self-help projects, road construction and rural transport, employment and environmental rehabilitation, and water as a source of employment. (SK)
ERIC Educational Resources Information Center
Smyth, Carol B.; Grannell, Dorothy S.; Moore, Miriam
The Literacy Resource Center project, a program of the Wayne Township Public Library also known as the Morrisson-Reeves Library (Richmond, Indiana), involved recruitment, retention, coalition building, public awareness, training, basic literacy, collection development, tutoring, computer-assisted, other technology, employment oriented,…
ERIC Educational Resources Information Center
LaDuke, Caryl
The Adult Reading Program, a project of the Mesa County Public Library District (Grand Junction, Colorado), involved recruitment, retention, coalition building, public awareness, training, rural oriented, basic literacy, collection development, tutoring, employment oriented, intergenerational/family, and English as a Second Language (ESL)…
DOT National Transportation Integrated Search
2012-02-01
A public private partnership (PPP or P3), according to the FHWA, is a contractual agreement : between a public agency and a private entity for private sector participation in the delivery of : transportation projects. One of the most innovat...
LSCA Builds Michigan Libraries.
ERIC Educational Resources Information Center
Michigan Library, Lansing.
This report highlights 19 of the 48 recently completed public library construction projects in Michigan which received partial funding from the 1983 Emergency Jobs Act. The grants were administered under Title II of the Library Services and Construction Act (LSCA). Introductory material includes listings of the State of Michigan Legislative…
The S-curve for forecasting waste generation in construction projects.
Lu, Weisheng; Peng, Yi; Chen, Xi; Skitmore, Martin; Zhang, Xiaoling
2016-10-01
Forecasting construction waste generation is the yardstick of any effort by policy-makers, researchers, practitioners and the like to manage construction and demolition (C&D) waste. This paper develops and tests an S-curve model to indicate accumulative waste generation as a project progresses. Using 37,148 disposal records generated from 138 building projects in Hong Kong in four consecutive years from January 2011 to June 2015, a wide range of potential S-curve models are examined, and as a result, the formula that best fits the historical data set is found. The S-curve model is then further linked to project characteristics using artificial neural networks (ANNs) so that it can be used to forecast waste generation in future construction projects. It was found that, among the S-curve models, cumulative logistic distribution is the best formula to fit the historical data. Meanwhile, contract sum, location, public-private nature, and duration can be used to forecast construction waste generation. The study provides contractors with not only an S-curve model to forecast overall waste generation before a project commences, but also with a detailed baseline to benchmark and manage waste during the course of construction. The major contribution of this paper is to the body of knowledge in the field of construction waste generation forecasting. By examining it with an S-curve model, the study elevates construction waste management to a level equivalent to project cost management where the model has already been readily accepted as a standard tool. Copyright © 2016 Elsevier Ltd. All rights reserved.
ERIC Educational Resources Information Center
Mooney, Sharon Lopez
The West Marin Literacy Project, a project of the Marin County Free Library (San Rafael, California), involved recruitment, retention, coalition building, public awareness, training, rural oriented, tutoring, computer- assisted, intergenerational/family, and English as a Second Language (ESL) programs. The project served a community of under…
Report of Library Services and Construction Act Project #2842, January 1-June 30, 1966.
ERIC Educational Resources Information Center
Los Angeles Public Library, CA.
This report covers the first six months of the Los Angeles Public Library's federally funded project to extend library service to the disadvantaged. Section I covers the recruitment and training of staff members for the project, including monthly staff orientation meetings emphasizing technical and sensitivity training. Section II describes the…
Code of Federal Regulations, 2010 CFR
2010-07-01
... trails, or boardwalks, including signs, the primary purposes of which are public education... Architectural Barriers Act or postal accessibility standards; (3) Any facility construction project deemed...
Reducing construction waste: A study of urban infrastructure projects.
de Magalhães, Ruane Fernandes; Danilevicz, Ângela de Moura Ferreira; Saurin, Tarcisio Abreu
2017-09-01
The construction industry is well-known for producing waste detrimental to the environment, and its impacts have increased with the development process of cities. Although there are several studies focused on the environmental impact of residential and commercial buildings, less knowledge is available regarding decreasing construction waste (CW) generation in urban infrastructure projects. This study presents best practices to reduce waste in the said projects, stressing the role of decision-making in the design stage and the effective management of construction processes in public sector. The best practices were identified from literature review, document analysis in 14 projects of urban infrastructure, and both qualitative and quantitative survey with 18 experts (architects and engineers) playing different roles on those projects. The contributions of these research are: (i) the identification of the main building techniques related to the urban design typologies analyzed; (ii) the identification of cause-effect relationships between the design choices and the CW generation diagnosis; (iii) the proposal of a checklist to support the decision-making process, that can be used as a control and evaluation instrument when developing urban infrastructure designs, focused on the construction waste minimization (CWM). Copyright © 2017 Elsevier Ltd. All rights reserved.
42 CFR 137.304 - May Self-Governance Tribes buy back environmental services from the IHS?
Code of Federal Regulations, 2010 CFR
2010-10-01
... project agreement, including design and construction engineering, and environmental compliance services... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes buy back environmental...-GOVERNANCE Construction Nepa Process § 137.304 May Self-Governance Tribes buy back environmental services...
45 CFR 98.84 - Construction and renovation of child care facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... services, quality activities, or administrative costs). (h) A construction or renovation project that... facilities. 98.84 Section 98.84 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION... child care services provided by the Tribal Lead Agency as compared to the level of services provided by...
18 CFR 11.6 - Exemption of State and municipal licensees and exemptees.
Code of Federal Regulations, 2014 CFR
2014-04-01
.... (a) Bases for exemption. A State or municipal licensee or exemptee may claim total or partial... State or municipal purposes, such as lighting streets, highways, parks, public buildings, etc., for... profit. (g) Construction period. During the period when the licensed project is under construction and is...
18 CFR 11.6 - Exemption of State and municipal licensees and exemptees.
Code of Federal Regulations, 2011 CFR
2011-04-01
.... (a) Bases for exemption. A State or municipal licensee or exemptee may claim total or partial... State or municipal purposes, such as lighting streets, highways, parks, public buildings, etc., for... profit. (g) Construction period. During the period when the licensed project is under construction and is...
18 CFR 11.6 - Exemption of State and municipal licensees and exemptees.
Code of Federal Regulations, 2010 CFR
2010-04-01
.... (a) Bases for exemption. A State or municipal licensee or exemptee may claim total or partial... State or municipal purposes, such as lighting streets, highways, parks, public buildings, etc., for... profit. (g) Construction period. During the period when the licensed project is under construction and is...
18 CFR 11.6 - Exemption of State and municipal licensees and exemptees.
Code of Federal Regulations, 2012 CFR
2012-04-01
.... (a) Bases for exemption. A State or municipal licensee or exemptee may claim total or partial... State or municipal purposes, such as lighting streets, highways, parks, public buildings, etc., for... profit. (g) Construction period. During the period when the licensed project is under construction and is...
Sahin, Sükran; Kurum, Ekrem
2009-09-01
Ecological monitoring is a complementary component of the overall environmental management and monitoring program of any Environmental Impact Assessment (EIA) report. The monitoring method should be developed for each project phase and allow for periodic reporting and assessment of compliance with the environmental conditions and requirements of the EIA. Also, this method should incorporate a variance request program since site-specific conditions can affect construction on a daily basis and require time-critical application of alternative construction scenarios or environmental management methods integrated with alternative mitigation measures. Finally, taking full advantage of the latest information and communication technologies can enhance the quality of, and public involvement in, the environmental management program. In this paper, a landscape-scale ecological monitoring method for major construction projects is described using, as a basis, 20 months of experience on the Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline Project, covering Turkish Sections Lot B and Lot C. This analysis presents suggestions for improving ecological monitoring for major construction activities.
7 CFR 1924.13 - Supplemental requirements for more complex construction.
Code of Federal Regulations, 2013 CFR
2013-01-01
... the site selection and participate in early consultations regarding project scope and design. (3... consecutive phases as follows: (i) Schematic design phase. The architect will: (A) Consult with the applicant... Public Law 103-354 requirements and procedures. (C) Assist in preparing the project design after...
7 CFR 1924.13 - Supplemental requirements for more complex construction.
Code of Federal Regulations, 2011 CFR
2011-01-01
... the site selection and participate in early consultations regarding project scope and design. (3... consecutive phases as follows: (i) Schematic design phase. The architect will: (A) Consult with the applicant... Public Law 103-354 requirements and procedures. (C) Assist in preparing the project design after...
7 CFR 1924.13 - Supplemental requirements for more complex construction.
Code of Federal Regulations, 2012 CFR
2012-01-01
... the site selection and participate in early consultations regarding project scope and design. (3... consecutive phases as follows: (i) Schematic design phase. The architect will: (A) Consult with the applicant... Public Law 103-354 requirements and procedures. (C) Assist in preparing the project design after...
7 CFR 1924.13 - Supplemental requirements for more complex construction.
Code of Federal Regulations, 2014 CFR
2014-01-01
... the site selection and participate in early consultations regarding project scope and design. (3... consecutive phases as follows: (i) Schematic design phase. The architect will: (A) Consult with the applicant... Public Law 103-354 requirements and procedures. (C) Assist in preparing the project design after...
7 CFR 1924.13 - Supplemental requirements for more complex construction.
Code of Federal Regulations, 2010 CFR
2010-01-01
... the site selection and participate in early consultations regarding project scope and design. (3... consecutive phases as follows: (i) Schematic design phase. The architect will: (A) Consult with the applicant... Public Law 103-354 requirements and procedures. (C) Assist in preparing the project design after...
43 CFR 404.2 - What terms are used in this part?
Code of Federal Regulations, 2014 CFR
2014-10-01
..., primarily using existing data. An appraisal investigation includes a preliminary assessment of alternatives... project sponsor to carry out a public purpose of support or stimulation authorized by law. For purposes of... project should be authorized for construction. Feasibility study means a detailed investigation requiring...
43 CFR 404.2 - What terms are used in this part?
Code of Federal Regulations, 2013 CFR
2013-10-01
..., primarily using existing data. An appraisal investigation includes a preliminary assessment of alternatives... project sponsor to carry out a public purpose of support or stimulation authorized by law. For purposes of... project should be authorized for construction. Feasibility study means a detailed investigation requiring...
43 CFR 404.2 - What terms are used in this part?
Code of Federal Regulations, 2012 CFR
2012-10-01
..., primarily using existing data. An appraisal investigation includes a preliminary assessment of alternatives... project sponsor to carry out a public purpose of support or stimulation authorized by law. For purposes of... project should be authorized for construction. Feasibility study means a detailed investigation requiring...
Report #11-R-0214, May 2, 2011. We conducted an unannounced visit of the construction site of the Perkins Public Works Authority’s wastewater treatment facility improvements project in Perkins, Oklahoma, on April 19–22, 2010.
44 CFR 209.10 - Project implementation requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... to match elevation or acquisition and relocation projects. Increased Cost of Compliance claims can... new structure(s) will be built on the property except as indicated in this paragraph: (A) A public... of FEMA approves in writing before the construction of the structure begins. (D) In general...
44 CFR 209.10 - Project implementation requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... to match elevation or acquisition and relocation projects. Increased Cost of Compliance claims can... new structure(s) will be built on the property except as indicated in this paragraph: (A) A public... of FEMA approves in writing before the construction of the structure begins. (D) In general...
44 CFR 209.10 - Project implementation requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... to match elevation or acquisition and relocation projects. Increased Cost of Compliance claims can... new structure(s) will be built on the property except as indicated in this paragraph: (A) A public... of FEMA approves in writing before the construction of the structure begins. (D) In general...
44 CFR 209.10 - Project implementation requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... to match elevation or acquisition and relocation projects. Increased Cost of Compliance claims can... new structure(s) will be built on the property except as indicated in this paragraph: (A) A public... of FEMA approves in writing before the construction of the structure begins. (D) In general...
44 CFR 209.10 - Project implementation requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... to match elevation or acquisition and relocation projects. Increased Cost of Compliance claims can... new structure(s) will be built on the property except as indicated in this paragraph: (A) A public... of FEMA approves in writing before the construction of the structure begins. (D) In general...
18 CFR 12.23 - Time for filing emergency action plan.
Code of Federal Regulations, 2010 CFR
2010-04-01
... might endanger construction workers or otherwise endanger public health or safety, a temporary... REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS Emergency Action Plans § 12.23 Time for filing emergency action plan. (a...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mushkatel, A.H.; Conway, S.; Navis, I.
2006-07-01
This paper focuses on the difficulties of projecting fiscal impacts to public safety agencies from the proposed high-level nuclear waste repository at Yucca Mountain, Nevada. The efforts made by Clark County Nevada, to develop a fiscal model of impacts for public safety agencies are described in this paper. Some of the difficulties in constructing a fiscal model of impacts for the entire 24 year high-level nuclear waste transportation shipping campaign are identified, and a refined methodology is provided to accomplish this task. Finally, a comparison of the fiscal impact projections for public safety agencies that Clark County developed in 2001,more » with those done in 2005 is discussed, and the fiscal impact cost projections for the entire 24 year transportation campaign are provided. (authors)« less
Application of multi-criteria decision analysis in selecting of sustainable investments
NASA Astrophysics Data System (ADS)
Kozik, Renata
2017-07-01
Investors of construction projects, especially financed with public money, quite slowly adapt environmentally friendly solutions, e.g. passive buildings. Practice shows that the use of green public procurement among the public investors is negligible. Energy-saving technologies and equipment are expensive at the construction phase and investors less or not at all take into account the future operating costs. The aim of this article is to apply the method of multi-criteria analysis ELECTRE to select the best investment in terms of cost of implementation, operation, as well as the impact on the environment.
1990-06-01
Appendices F , G, and H Report NA705R2 DTIC S 1LECTE AUG 0 ? 1990 June 1990 Trevor L. Neve Jordan W. Cassell Robert L. Crosslin rApt. :’ tcr pubiir" i.g4ll...Appendices F , G, and H. Volume 1 describes the findings, conclusions, and recommendations of our study of public/private ventures in the construction and...through L. NxjTj5 ii Dli. IA .j,,., .,- AL >Il( cf! . .111 APPENDIX F DEMAND VERIFICATION STUDY FOR A PROPOSED 150-ROOM PUBLIC-PRIVATE VENTURE TRANSIENT
Determination of the optimal proportions of public and private funds in project budget management
NASA Astrophysics Data System (ADS)
Pykhtin, Kirill; Simankina, Tatyana; Karmokova, Kristina; Zonova, Alevtina
2017-10-01
Although the historical period of public-private partnership in the Russian federation is rather short, yet this type of cooperation of private entrepreneurs and authorities became the major driver of growth in such areas as construction, utilities, infrastructure and energetics. However, even though the experience of foreign countries is much larger than of Russia, great number of human resources are still consumed within disputes and disquisitions in order to assess the ratio of private and public funds. The present paper is based on the idea that this ratio can be determined for each of the industries with the use of statistical data. The authors offered the change in project cost range within the project classification regarding to the “project scale” characteristic.
NASA Astrophysics Data System (ADS)
Kalika, S.
2012-12-01
In commercial development or K-12 school construction, project sites are often purchased and much of the planning process completed prior to an assessment of the soils proposed for excavation or potential offhaul. Geologic maps, while initially helpful for identifying potential hazards such as landslides and earthquake faults, are less helpful in the identification of naturally occurring hazardous minerals, such as the seven regulated minerals currently classified as asbestos. Geologic maps identify mafic and ultramafic bedrock zones; however, a skilled geologist with knowledge of asbestos hazards will further visualize the earth-shaping processes that may have resulted in the deposition of naturally occurring asbestos in locations outside mapped ultramafic zones including the base of an alluvial fan or within streambed channels. When sampled as an afterthought prior to disposal, property owners are surprised by the budget-crippling costs of waste handling and disposal of NOA, as well as mitigations required to protect the health of construction workers, the public, and future site occupants. The California Air Resources Board (CARB) continues to lead the way in evaluation and regulation of NOA, through development of the CARB 435 preparation and laboratory analytical method, local enforcement of the Asbestos Airborne Toxic Control Measure for Construction, Grading, Quarrying, and Surface Mining Operations (ATCM), and implementation of dust control measures to protect public health. A thorough site evaluation and construction design includes utilization of the sampling methods developed by the California Geological Survey, laboratory analytical methods within CARB 435, and mitigation measures required by CARB, DTSC, and OSHA for the protection of worker and public health after NOA is discovered. The site evaluation should additionally include an assessment of the future site usage, as regulations differ based on potential health affects to future occupants. Construction and long-term monitoring at an elementary school differs in regulatory requirements from construction of a commercial property. This presentation will highlight two case studies: a school project with several years of advance planning versus a commercial property where NOA was discovered weeks before the start of construction. The presentation will analyze the regulatory differences, mitigation measures, and consideration of the financial impacts that the discovery of NOA can have on a school versus a commercial project.
Bibliography of Selected SCSD, URBS, SSP, SEF, and RAS Publications.
ERIC Educational Resources Information Center
Stanford Univ., CA. School Planning Lab.
The annotated bibliography contains publications and report listings of the following sources--(1) School Construction Systems Development (SCSD), (2) University Residential Building Systems (URBS), (3) Florida Schoolhouse Systems Project (SSP), (4) Study of Educational Facilities (SEF), and (5) Recherches en Amenagements Scolaires (RAS) Building…
Code of Federal Regulations, 2010 CFR
2010-07-01
... granting authority for either construction, in the case of a proposed project, or for continued operation... full public interest review pursuant to 33 CFR part 320 and the application of the Environmental...) Consideration of the project in relation to a comprehensive plan for developing the basin water resources from...
Guidebook to the School Facility Program.
ERIC Educational Resources Information Center
California State Dept. of General Services, Sacramento. Office of Public School Construction.
This guidebook assists California school districts in applying for and obtaining "grant" funds for new construction and modernization projects of its public schools under the provisions of the Leroy F. Greene School Facilities Act of 1998. It provides direction on accessing the processes leading to project approvals, insight into the various…
Code of Federal Regulations, 2010 CFR
2010-04-01
... as best suited to protect the public health and safety. (j) ER program funding is only to be used to... feasible, the cost of permanent restoration work. (d) The approval to use available ER funds to repair or... over non-emergency work. (h) ER projects shall be promptly constructed. Any project that has not...
23 CFR 652.9 - Federal participation.
Code of Federal Regulations, 2013 CFR
2013-04-01
... primary importance for the development, protection, administration, and utilization of public lands and... facilities that would be interrupted by construction of the project, or to mitigate specific environmental...
23 CFR 652.9 - Federal participation.
Code of Federal Regulations, 2014 CFR
2014-04-01
... primary importance for the development, protection, administration, and utilization of public lands and... facilities that would be interrupted by construction of the project, or to mitigate specific environmental...
23 CFR 652.9 - Federal participation.
Code of Federal Regulations, 2012 CFR
2012-04-01
... primary importance for the development, protection, administration, and utilization of public lands and... facilities that would be interrupted by construction of the project, or to mitigate specific environmental...
23 CFR 652.9 - Federal participation.
Code of Federal Regulations, 2011 CFR
2011-04-01
... primary importance for the development, protection, administration, and utilization of public lands and... facilities that would be interrupted by construction of the project, or to mitigate specific environmental...
36 CFR 297.2 - Scope and application.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Scope and application. 297.2 Section 297.2 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE WILD AND... assistance in the construction of water resources projects affecting Wild and Scenic Rivers or Study Rivers...
36 CFR 297.2 - Scope and application.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Scope and application. 297.2 Section 297.2 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE WILD AND... assistance in the construction of water resources projects affecting Wild and Scenic Rivers or Study Rivers...
36 CFR 297.2 - Scope and application.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Scope and application. 297.2 Section 297.2 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE WILD AND... assistance in the construction of water resources projects affecting Wild and Scenic Rivers or Study Rivers...
36 CFR 297.2 - Scope and application.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Scope and application. 297.2 Section 297.2 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE WILD AND... assistance in the construction of water resources projects affecting Wild and Scenic Rivers or Study Rivers...
36 CFR 297.2 - Scope and application.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Scope and application. 297.2 Section 297.2 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE WILD AND... assistance in the construction of water resources projects affecting Wild and Scenic Rivers or Study Rivers...
Construction Program Saved! Partnership Revitalizes School of Applied Technology
ERIC Educational Resources Information Center
LaPlaca, Joseph
2010-01-01
The Edison School of Applied Technology, a comprehensive public high school, has long had a reputation for producing top-notch crafts workers, tradespeople, project managers, estimators, and industry leaders. The school's graduates helped build the city and many currently have successful, productive careers in the public and private sectors. But…
Code of Federal Regulations, 2011 CFR
2011-10-01
...-Governance Tribes required to accept Federal environmental responsibilities to enter into a construction... 42 Public Health 1 2011-10-01 2011-10-01 false Are Self-Governance Tribes required to accept Federal environmental responsibilities to enter into a construction project agreement? 137.285 Section 137...
Design Guide for Selection and Specification of Kevlar Rope for Ocean Engineering and Construction.
1976-07-01
public rtoieco cnd sol . It i Idim .buttm Is ul"rnimi.. OCEAN ENGINEERING AND CONSTRUCTION PROJECT OFFICE CHESAPEAKE DIVISION NAVAL FACILITIES ENGINEERING...be to have no more than one layer. This is impractical for oceano - graphic purposes. Assuming a need to spooi many layers of rope under tension
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-23
... facilities and roads; construction of new public facilities (approximately 1,400 acres of the ground-disturbance total); and construction, operation, and maintenance of renewable energy projects, including solar... Supervisor, Ventura Fish and Wildlife Office, U.S. Fish and Wildlife Service, 2493 Portola Road, Suite B...
ERIC Educational Resources Information Center
Kahle, Brewster; Prelinger, Rick; Jackson, Mary E.; Boyack, Kevin W.; Wylie, Brian N.; Davidson, George S.; Witten, Ian H.; Bainbridge, David; Boddie, Stefan J.; Garrison, William A.; Cunningham, Sally Jo; Borgman, Christine L.; Hessel, Heather
2001-01-01
These six articles discuss various issues relating to digital libraries. Highlights include public access to digital materials; intellectual property concerns; the need for collaboration across disciplines; Greenstone software for construction and presentation of digital information collections; the Colorado Digitization Project; and conferences…
ERIC Educational Resources Information Center
Nevels, Vada Germaine
The Hopkinsville-Christian County Library (Kentucky) conducted a project that involved recruitment, public awareness, basic literacy, collection development, tutoring, computer-assisted, other technology, and intergenerational/family programs. The project served a community of 50,000-100,000 people, and targeted the learning disabled,…
ERIC Educational Resources Information Center
Rosynek, Joy
This final performance report provides project outcome information and data to the U.S. Department of Education for the federally-funded Library Literacy Program. The Jackson District Library (Michigan) conducted a project that involved recruitment, retention, public awareness, training, basic literacy, collection development, tutoring, employment…
Communication Network Design: West Ottawa School District.
ERIC Educational Resources Information Center
Couch, David deS.
This report describes the technical details and rationale behind the decisions in the design and development of the communications network installed as part of a 1991-1993 district-wide construction project in the West Ottawa Public Schools (Michigan). The project called for development of a communications network to carry voice, data, and video…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-17
... environmental impacts of the construction and operation of the reservoir, raw water conveyances, associated... Preparation of Environmental Impact Statement for the Proposed Glades Reservoir AGENCY: Department of the Army... supply reservoir project to be located in Hall County, Georgia. The proposed project would be comprised...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true What criteria will Reclamation use to determine whether to recommend that a proposed rural water supply project be authorized for construction? 404.49 Section 404.49 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURA...
42 CFR 137.304 - May Self-Governance Tribes buy back environmental services from the IHS?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false May Self-Governance Tribes buy back environmental...-GOVERNANCE Construction Nepa Process § 137.304 May Self-Governance Tribes buy back environmental services from the IHS? Yes, Self-Governance Tribes may “buy back” project related services in their construction...
Reid M. Helford
2000-01-01
In April 1996 an exciting new project was announced, an unprecedented conservation undertaking in one of the nation's most densely populated regions. Chicago Wilderness is a collaborative effort among the more than 90 organizations that make up the Chicago Region Biodiversity Council (CRBC) to protect, restore, and manage the region's natural landscapes...
ERIC Educational Resources Information Center
Preston, John; Avery, Barry; Chakrabarty, Namita; Edmonds, Casey
2011-01-01
Emergency preparedness can be considered to be a form of lifelong learning and public pedagogy with implications for race equality. The paper is based on an ESRC project "Preparedness pedagogies and race: an interdisciplinary approach" considering the policy process around the construction of the "Preparing for Emergencies"…
Capital Projects Manual for the Illinois Public Community Colleges.
ERIC Educational Resources Information Center
Illinois Community Coll. Board, Springfield.
This manual is designed primarily for use by those persons at Illinois public community colleges who are responsible for planning and keeping records of college facilities. The Illinois Community College Board (ICCB) is mandated by law to approve the expenditure of state funds for purchase of sites and the construction of facilities and to…
Code of Federal Regulations, 2010 CFR
2010-10-01
... design documents prepared by the Self-Governance Tribe? 137.360 Section 137.360 Public Health PUBLIC... HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in Establishing and... documents prepared by the Self-Governance Tribe? The Secretary shall have at least one opportunity to...
ERIC Educational Resources Information Center
Congress of the U.S., Washington, DC. Senate.
Presented is the 1975 amendment to the Developmental Disabilities Services and Facilities Construction Act. Described are revisions and extensions of the earlier act, including revision of grant and construction assistance for university affiliated facilities, and revision of special projects assistance. The earlier act's designation of rights of…
Minimizing delays in the Jordanian construction industry by adopting BIM technology
NASA Astrophysics Data System (ADS)
Btoush, M.; Harun, A. T.
2017-11-01
The Jordanian construction industry plays a significant role and contributes immensely to the gross domestic product (GDP) of the economy. However, the Jordanian public work and housing ministry and most industry players including engineers and contractors have reported that most of the projects experience delays which lead time and cost overruns, and extra efforts. The main causes of delays identified by researchers include poor scheduling and planning, change orders, site conditions, weather, late deliveries, incompetent technical staff. To address these challenges, the implementation of building information modelling (BIM) is paramount. This paper presents BIM as a powerful tool for reducing delays in Jordan construction projects. The paper focuses on two main parts; the first part involves the identification of the major causes of delays, and the second part is to accurately outline the roles and responsibilities of BIM specialist in construction projects. Finally, the paper matches the roles and responsibilities of BIM specialist and the causes of delays, and how the delays are addressed through BIM specialist.
A Proposal for the use of the Consortium Method in the Design-build system
NASA Astrophysics Data System (ADS)
Miyatake, Ichiro; Kudo, Masataka; Kawamata, Hiroyuki; Fueta, Toshiharu
In view of the necessity for efficient implementation of public works projects, it is expected to utilize advanced technical skills of private firms, for the purpose of reducing project costs, improving performance and functions of construction objects, and reducing work periods, etc. The design-build system is a method to order design and construction as a single contract, including design of structural forms and main specifications of the construction object. This is a system in which high techniques of private firms can be utilized, as a means to ensure qualities of design and construction, rational design, and efficiency of the project. The objective of this study is to examine the use of a method to form a consortium of civil engineering consultants and construction companies, as it is an issue related to the implementation of the design-build method. Furthermore, by studying various forms of consortiums to be introduced in future, it proposes procedural items required to utilize this method, during the bid and after signing a contract, such as the estimate submission from the civil engineering consultants etc.
76 FR 28029 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-13
... 210- 424-8346. EIS No. 20110143, Final EIS, BLM, CA, Palen Solar Power Plant Project, Construction, Operation and Decommission a Solar Thermal Facility on Public Lands, Approval for Right-of-Way Grant...
Public Higher Education Enrollment Forecasting in the State of Ohio.
ERIC Educational Resources Information Center
Render, Barry
With the growing concern for the development of good mathematical education planning models, few states have developed the type of enrollment projection systems that they would consider to be ideal. The primary objectives of this research project were to develop, construct, and document an enrollment forecasting system for use by the Ohio Board of…
Urban Options Solar Greenhouse Demonstration Project. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cipparone, L.
1980-10-15
The following are included: the design process, construction, thermal performance, horticulture, educational activities, and future plans. Included in appendices are: greenhouse blueprints, insulating curtain details, workshop schedules, sample data forms, summary of performance calculations on the Urban Options Solar Greenhouse, data on vegetable production, publications, news articles on th Solar Greenhouse Project, and the financial statement. (MHR)
ERIC Educational Resources Information Center
California State Postsecondary Education Commission, Sacramento.
This report projects 12-year enrollment demand for California's three public higher education systems, analyzes campus physical capacity and projected capital outlay costs, and discusses economic trends and California's ability to sell bonds to finance future higher education construction. The report is a major update to a 1995 report, "A…
Participatory Action Research: Collective Reflections on Gender, Culture, and Language
ERIC Educational Resources Information Center
McIntyre, Alice; Chatzopoulos, Nikolaos; Politi, Anastasia; Roz, Julieta
2007-01-01
The focus of this article is the experiences of three undergraduate students who engaged in a participatory action research (PAR) project with a group of preadolescent Latina girls attending a public school in Boston, MA, USA. The aim of the 2-year project was to explore how the girls constructed knowledge about girlhood and other gender-related…
Hammond Workforce 2000: A Three-Year Project. October 1989 to September 1992.
ERIC Educational Resources Information Center
Meyers, Arthur S.; Somerville, Deborah J.
A 3-year Library Services and Construction Act grant project from 1989-1992 provided for adult learning centers, equipped with Apple IIGS computers and software at each location of the Hammond Public Library (Indiana). User-friendly, job-based software to strengthen reading, writing, mathematics, spelling, and grammar skills, as well as video and…
Report of Library Services and Construction Act Project # 2842, January 1 - June 30, 1967.
ERIC Educational Resources Information Center
Los Angeles Public Library, CA.
The third of the Los Angeles Public Library's semi-annual reports on its federal project for the disadvantaged includes individual staff reports from the Central Region, Bookmobile Division, Lincoln Heights, Venice, The Display Artist, and a student worker. In these reports are discussions of (1) conditions and people in the communities served,…
Solar 2 Green Energy, Arts & Education Center. Final Scientific/Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Paquette, Jamie C; Collins, Christopher J
The Solar 2 Green Energy, Arts and Education Center is an 8,000 sq.ft. demonstration project that will be constructed to Platinum LEED certification and will be the first carbon-neutral, net-zero energy use public building in New York City, giving it local and national appeal. Employing green building features and holistic engineering practices throughout its international award-winning design, Solar 2 will be powered by a 90kW photovoltaic (PV) array in conjunction with a geothermal heating and cooling system and a high efficient design that seeks to reduce the overall energy load of the building. Solar 2 will replace our current 500more » sq.ft. prototype facility - known as Solar 1 - as the educational and cultural centerpiece of a five-block public greenway on the East River in Stuyvesant Cove Park, located along two acres of public riverfront on a newly reclaimed, former brownfield in lower Manhattan. Designed as a public-use complex for year-round environmental education exhibits and onsite activities for all ages and backgrounds, Solar 2 will demonstrate energy-efficiency technologies and sustainable environmental practices available now to all urban residents, eco-tourists, teachers, and students alike. Showcasing one of Solar 2's most striking design elements is the PV roof array with a cafe and river vistas for miles of New York City's skylines. Capping the building as a solar-powered landmark, and visible from the FDR Drive, the PV array is also designed to provide visitors below a view of the solar roof when standing outside, as well as directly underneath it. Recognized by an international jury of architects, civil engineers and urban designers by the Swiss-based Holcim Foundation, the Solar 2 design was awarded the prestigious Holcim North American 2008 Gold Award for Sustainable Construction for innovative, future-oriented and tangible sustainable construction projects, selected from more than 1900 entries. Funding from the Department of Energy was provided to assist with the ongoing design work of Solar 2, including architecture, engineering and the development of construction specifications. The work performed during the project period brought this process as far along as it could go pending the raising of funds to begin construction of the building. Once those funds are secured, we will finalize any additional details needed before beginning the bidding process and then moving into construction. DOE's funding was extremely valuable in helping Solar One determine the feasibility of a net-zero construction on the site and allowed for the design to project to meet the high standards necessary for LEED Platinum status.« less
The Frankenstein Project: Examining Media's Role in Constructing Romantic Relationship Ideals
ERIC Educational Resources Information Center
Ribarsky, Elizabeth
2014-01-01
Media have become ever-present factors in most college students' lives (Turan, Tinmaz, & Goktas, 2013). Despite this infiltration, students (and most of the public) remain remarkably unaware of the significant role the media can play in the construction of a social reality and, in turn, how individuals act and interact on a daily basis…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-28
... to allow its affiliate, EGP Solar 1, LLC, to construct and maintain a 2.2 megawatt solar photovoltaic... solar array would be constructed on both sides of Heather Lane (the project's access road), but public... be used for the solar array is currently devoid of trees, although some grading and tree cutting is...
Black, I; Seaton, R; Chackiath, S; Wagland, S T; Pollard, S J T; Longhurst, P J
2011-12-01
The identification of risk and its appropriate allocation to partners in project consortia is essential for minimizing overall project risks, ensuring timely delivery and maximizing benefit for money invested. Risk management guidance available from government bodies, especially in the UK, does not specify methodologies for quantitative risk assessment, nor does it offer a procedure for allocating risk among project partners. Here, a methodology to quantify project risk and potential approaches to allocating risk and their implications are discussed. Construction and operation of a waste management facility through a public-private finance contract are discussed. Public-private partnership contracts are special purpose vehicle (SPV) financing methods promoted by the UK government to boost private sector investment in facilities for public service enhancement. Our findings question the appropriateness of using standard deviation as a measure for project risk and confirm the concept of portfolio theory, suggesting the pooling of risk can reduce total risk and its impact.
Hatipkarasulu, Yilmaz; Gill, James H
2004-04-01
The increasing number of companies providing internet services and auction tools helped popularize the online reverse auction trend for purchasing commodities and services in the last decade. As a result, a number of owners, both public and private, accepted the online reverse auctions as the bidding technique for their construction projects. Owners, while trying to minimize their costs for construction projects, are also required to address their ethical responsibilities to the shareholders. In the case of online reverse auctions for construction projects, the ethical issues involved in the bidding technique directly reflects on the owner's ethical and social responsibilities to their shareholders. The goal of this paper is to identify the shareholder ethics and responsibilities in online reverse auctions for construction projects by analyzing the ethical issues for the parties involved in the process. The identification of the ethical issues and responsibilities requires clear definition and understanding of professional ethics and the roles of the involved parties. In this paper, first, the concept of professional ethics and social responsibility is described in a general form. To illustrate the ethical issues and responsibilities, a sample case of bidding for a construction project using online reverse auction techniques is presented in which the shareholders were actively involved in questioning the ethical issues. The issues involved in the bidding process and their reflection on the shareholder responsibilities are described and analyzed for each stage of the process. A brief discussion of the overall process is also included to address the general ethical issues involved in online reverse auctions.
Vigo County Public Library Mediamobile: Evaluation of a Library Services Act Project.
ERIC Educational Resources Information Center
Pahl, E. Patricia; Pahl, Thomas L.
The Vigo County (Indiana) Public Library received a two-year grant, under the Library Services and Construction Act, to improve services to the disadvantaged in urban and rural areas. A program was developed to use a converted bookmobile to deliver films, records, video tape, viewmasters, tape recorders, and other "new" media to the OEO…
Code of Federal Regulations, 2010 CFR
2010-10-01
... rights in other compact, funding negotiations, or construction project agreement? 137.435 Section 137.435 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Appeals Pre-Award Disputes § 137.435 Will an...
NASA Astrophysics Data System (ADS)
Latief, Yusuf; Armyn Machfudiyanto, Rossy; Arifuddin, Rosmariani; Mahendra Fira Setiawan, R.; Yogiswara, Yoko
2017-07-01
Safety Culture in the construction industry is very influential on the socio economic conditions that resulted in the country’s competitiveness. Based on the data, the accident rate of construction projects in Indonesia is very high. In the era of the Asian Economic Community (AEC) Indonesian contractor is required to improve competitiveness, one of which is the implementation of the project without zero accident. Research using primary and secondary data validated the results of the literature experts and questionnaire respondents were analyzed using methods SmartPLS, obtained pattern of relationships between dimensions of safety culture to improve the performance of Safety. The results showed that the behaviors and Cost of Safety into dimensions that significantly affect the performance of safety. an increase in visible policy-based on Regulation of Public Work and Housing No 5/PRT/M/2014 to improve to lower the accident rate.
Chan, Daniel W M; Chan, Albert P C; Choi, Tracy N Y
2010-10-01
The Government of the Hong Kong Special Administrative Region (SAR) has implemented different safety initiatives to improve the safety performance of the construction industry over the past decades. The Pay for Safety Scheme (PFSS), which is one of the effective safety measures launched by the government in 1996, has been widely adopted in the public works contracts. Both the accident rate and fatality rate of public sector projects have decreased noticeably over this period. This paper aims to review the current state of application of PFSS in Hong Kong, and attempts to identify and analyze the perceived benefits of PFSS in construction via an industry-wide empirical questionnaire survey. A total of 145 project participants who have gained abundant hands-on experience with the PFSS construction projects were requested to complete a survey questionnaire to indicate the relative importance of those benefits identified in relation to PFSS. The perceived benefits were measured and ranked from the perspectives of the client and contractor for crosscomparison. The survey findings suggested the most significant benefits derived from adopting PFSS were: (a) Increased safety training; (b) Enhanced safety awareness; (c) Encouragement of developing safety management system; and (d) Improved safety commitment. A wider application of PFSS should be advocated so as to achieve better safety performance within the construction industry. It is recommended that a similar scheme to the PFSS currently adopted in Hong Kong may be developed for implementation in other regions or countries for international comparisons. Copyright © 2010 Elsevier Ltd and National Safety Council. All rights reserved.
DOT National Transportation Integrated Search
2013-12-01
In June 2000, the State of Alaska Department of Transportation and Public Facilities completed construction of the Whittier Access Project by converting the existing 2.5- : mile Whittier Tunnel into the worlds only dual-use highway/rail tunnel wit...
Extended comparison tool for major highway projects.
DOT National Transportation Integrated Search
2003-01-01
Under the Virginia Transportation Act signed into law in April 2000, more than $10 billion would have been invested in highway construction, public transportation, airports, and ports during the following 6 years. However, recent budgetary constraint...
Earth observations can be used to address human health concerns in many ways: projecting occurrence of disease or disease outbreaks; rapid detection and tracking of events; construction of risk maps; targeting interventions; and enhancing knowledge of human health-environment int...
Signage Required Term and Condition
The recipient is required to place a sign at construction sites supported under this award displaying the EPA logo in a manner that informs the public that the project is funded in part or wholly by the EPA.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Does the Secretary have a role in the fee-to-trust process when real property is purchased with construction project agreement funds? 137.372 Section 137.372 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...
Steven Glass; Joan Thullen; Jim Sartoris; Rick Roline
1996-01-01
The Pueblo of Isleta, located five miles downstream from Albuquerque, and the NM Water Quality Control Commission has established strict water quality standards for the Rio Grande, and it has become necessary for the Albuquerque Public Works Department to pursue methods to enhance the purity of treated municipal wastewater effluent produced at the Southside Water...
Report of Library Services and Construction Act Project # 2842, July 1 - December 31, 1966.
ERIC Educational Resources Information Center
Los Angeles Public Library, CA.
This report covers the second six months of the Los Angeles Public Library's project to extend library service to the disadvantaged. In the second period emphasis was placed on involvement with individuals as well as with community groups, on development of techniques, and on assembling a variety of materials for reaching and working with…
2011-01-01
The public health response to sexually transmitted infections, particularly HIV, has been and continues to be overwhelmingly focused on risk, disease and negative outcomes of sex, while avoiding discussion of positive motivations for sex (e.g. pleasure, desire, love). Recent advocacy efforts have challenged this approach and organisations have promoted the eroticisation of safer sex, especially in the context of HIV prevention. This paper is a case study of one of these organizations – The Pleasure Project. It gives a brief background on the public-health approach to sex and sexual health, and recommends an alternative approach which incorporates constructs of pleasure and desire into sexual health interventions. The Pleasure Project’s aims and unorthodox communications strategies are described, as are the response to and impact of its work, lessons learned and ongoing challenges to its approach. The Pleasure Project combines evidence (rigorous and experimental as well as qualitative and anecdotal) with experiential knowledge from the sex industry and safer-sex promotion to communicate messages about eroticising safer sex to influence researchers, public health practitioners and policymakers, mainstream media and the porn world. There are significant barriers to this work, because it challenges common and entrenched norms and values related to sex and pleasure and their role in the public health sphere. Other barriers include: the limited range of existing rigorous intervention trials which incorporate pleasure constructs; the lack of effective indicators to measure pleasure constructs; limited funding and resources; discomfort among public health practitioners, researchers and donors with concepts of pleasure and sex; and rejection of erotic media as a potential tool for prevention. Despite the backdrop of sex-negative public health practice, there is anecdotal evidence that safer sex, including condom use, can be eroticised and made pleasurable, based on qualitative research by The Pleasure Project and other like-minded organisations. Yet there is a need for more research on the effectiveness of pleasure components in sexual health interventions, particularly in high-risk contexts. This need has become urgent as practitioners look for new ways to promote sexual health and as new prevention technologies (including female condoms and microbicides) are introduced or disseminated. PMID:21679380
Modeling Transit Patterns Via Mobile App Logs.
DOT National Transportation Integrated Search
2016-01-01
Transit planners need detailed information of the trips people take using public transit in : order to design more optimal routes, address new construction projects, and address the : constantly changing needs of a city and metro region. Better trans...
City of Waukee, Iowa - Clean Water Act Public Notice
The EPA is providing notice of a proposed Administrative Penalty Assessment against City of Waukee, Iowa, for alleged violations at the Westown Parkway and R22 Intersection Improvement Project construction site in Waukee, Iowa 50263.
Mapping Flood Reduction Benefits of Potential Wetlands Restoration
Public officials and environmental managers face difficult decisions when allocating funds to prioritize the most beneficial wetlands conservation or restoration projects, and often face difficulty even characterizing benefits. One benefit of natural and constructed wetlands is t...
Heinrich, Katie M; Lightner, Joseph; Oestman, Katherine B; Hughey, S Morgan; Kaczynski, Andrew T
2014-11-26
Trails are associated with increased physical activity; however, little is known about the process of building trails by various types of organizations. From 2005 through 2012 the Sunflower Foundation: Health Care for Kansans (Sunflower) funded multiple organizations to construct 70 trails of varying lengths and surfaces in municipalities, schools, and communities across Kansas. The purpose of this study was to assess the process of developing and implementing community trail projects across Kansas with funding from a public foundation. In 2012, we stratified funded organizations by type and conducted proportional random sampling to select 20 key informants from those organizations to participate in structured telephone interviews. Interviews were recorded and transcribed verbatim. Two researchers coded interview transcripts according to issues identified by participants. Issues associated with trail-building identified as important were collaboration among groups, unexpected construction costs, champions for the project, and level of difficulty of construction. Participants indicated that trails facilitated physical activity. Trails were integrated into communities through events such as walking events and other promotional efforts; these efforts were thought to increase trail use. The perceived outcomes of building the trails included providing the community with a physical activity resource, inspiring the community to start additional trail projects, and increasing the physical activity of local residents. Sunflower's funding was instrumental in developing trail projects to provide new physical activity resources across Kansas. Public health practitioners seeking to increase physical activity should seek funding from foundations that focus on health.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mushkatel, A.H.; Conway, P.H.D.S.; Navis, I.
2008-07-01
This paper focuses on projecting fiscal impacts to public safety agencies from the proposed high-level nuclear waste repository at Yucca Mountain, Nevada. The efforts made by Clark County Nevada, to develop a fiscal model of impacts for public safety agencies are described in this paper. In addition, the scenarios used in the study are discussed, as well as a discussion of the plume models provided for each community's scenario that result from the efforts of the National Atmospheric Release Advisory Center (NARAC). Some of the difficulties in constructing a fiscal model of impacts for the entire 24 year high-level nuclearmore » waste transportation shipping campaign are identified, and a refined methodology is provided to accomplish this task. Finally, a comparison of the fiscal impact projections for public safety agencies that Clark County developed in 2001, 2005 are discussed, and the fiscal impact cost projections for the entire 24 year transportation campaign are provided. (authors)« less
2017-01-01
This paper contributes to the pursuit of socially sustainable water and sanitation infrastructure for all people by discovering statistically robust relationships between Hofstede’s dimensions of cross-cultural comparison and the choice of contract award types, project type, and primary revenue sources. This analysis, which represents 973 projects distributed across 24 low- and middle-income nations, uses a World Bank dataset describing high capital cost water and sewerage projects funded through private investment. The results show that cultural dimensions explain variation in the choice of contract award types, project type, and primary revenue sources. These results provide empirical evidence that strategies for water and sewerage project organization are not culturally neutral. The data show, for example, that highly individualistic contexts are more likely to select competitive contract award types and to depend on user fees to provide the primary project revenue stream post-construction. By selecting more locally appropriate ways to organize projects, project stakeholders will be better able to pursue the construction of socially sustainable water and sewerage infrastructure. PMID:29200432
Malheur River Wildlife Mitigation Project, Annual Report 2003.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ashley, Paul
Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affectmore » wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project proposals are subjected to a rigorous review process prior to receiving final approval. An eleven-member panel of scientists referred to as the Independent Scientific Review Panel (ISRP) examines project proposals. The ISRP recommends project approval based on scientific merit. The Bonneville Power Administration (BPA), the Columbia Basin Fish and Wildlife Authority (CBFWA), Council staff, the U.S. Fish and Wildlife Service (USFWS), the National Oceanic and Atmospheric Administration (NOAA), and subbasin groups also review project proposals to ensure each project meets regional and subbasin goals and objectives. The Program also includes a public involvement component that gives the public an opportunity to provide meaningful input on management proposals. After a thorough review, the Burns Paiute Tribe (BPT) acquired the Malheur River Mitigation Project (Project) with BPA funds to compensate, in part, for the loss of fish and wildlife resources in the Columbia and Snake River Basins and to address a portion of the mitigation goals identified in the Council's Program (NPPC 2000).« less
CONSTRUCTING PRICES: ANCHORING, ADJUSTMENT, AND AFFECT. (R827931)
The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...
Code of Federal Regulations, 2012 CFR
2012-10-01
... PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH Grants for Development, Construction, and Operation of Facilities... which the proposed project is compatible with published Indian Health Service statements of availability...
Code of Federal Regulations, 2013 CFR
2013-10-01
... PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH Grants for Development, Construction, and Operation of Facilities... which the proposed project is compatible with published Indian Health Service statements of availability...
Code of Federal Regulations, 2014 CFR
2014-10-01
... PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH Grants for Development, Construction, and Operation of Facilities... which the proposed project is compatible with published Indian Health Service statements of availability...
ERIC Educational Resources Information Center
Lundt, John C.; Matt, John
2001-01-01
As serving as its own contractor, a small district in western Montana saved money, had better control over the project, and inspired public confidence. Major advantages were cost savings, controlling the pace of construction, and the ability to cope with change orders. (MLF)
Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Collar, Craig W
2012-11-16
Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step towardmore » potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-12
... Reach Hydroelectric Project. f. Location: The project is located on the Columbia River in the City of..., Wenatchee, WA 98807. Phone: (509) 663-8121. i. FERC Contact: Any questions on this notice should be... construct a 40-slip community boat dock, and a community access area on the left bank of the Columbia River...
Anderson, Alice L; O'Brien, Kevin; Hartwell, Megan
2007-04-01
Wetlands serve an important purpose in flood control and water quality, but constructed-wetland sites also provide habitats for mosquito breeding. Communities near constructed-wetland sites often raise a "mosquito" objection when constructed wetlands are proposed. Wildlife and wetland advocates can confuse the public by making unsubstantiated claims about natural predators eliminating or controlling mosquito problems in a constructed wetland. Management of constructed-wetland mosquito habitat, with adequate mosquito surveillance and data analysis, can help lead to a successful project and satisfied citizens. The cooperative project described in this paper, was conducted in the town of Simpson, North Carolina, and was designed to determine the mosquito population impact of wetland construction at Mill Branch Stream, a small tributary of the Tar River in Eastern North Carolina. In the authors' analysis of three years of mosquito surveillance data, month (time of year standing in for temperature and day length) was a significant factor in regression analysis for mosquito numbers, but rainfall was not. Numbers of mosquitoes were not found to be significantly higher after construction than before construction.
Southeast geysers effluent pipeline project. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dellinger, M.
1998-01-15
The project concept originated in 1990 with the convergence of two problems: (1) a need for augmented injection to mitigate declining reservoir productivity at the Geysers; and (2) a need for a new method of wastewater disposal for Lake County communities near the The Geysers. A public/private partnership of Geysers operators and the Lake County Sanitation District (LACOSAN) was formed in 1991 to conduct a series of engineering, environmental, and financing studies of transporting treated wastewater effluent from the communities to the southeast portion of The Geysers via a 29-mile pipeline. By 1994, these evaluations concluded that the concept wasmore » feasible and the stakeholders proceeded to formally develop the project, including pipeline and associated facilities design; preparation of an environmental impact statement; negotiation of construction and operating agreements; and assembly of $45 million in construction funding from the stakeholders, and from state and federal agencies with related program goals. The project development process culminated in the system`s dedication on October 16, 1997. As of this writing, all project components have been constructed or installed, successfully tested in compliance with design specifications, and are operating satisfactorily.« less
PAL: an object-oriented programming library for molecular evolution and phylogenetics.
Drummond, A; Strimmer, K
2001-07-01
Phylogenetic Analysis Library (PAL) is a collection of Java classes for use in molecular evolution and phylogenetics. PAL provides a modular environment for the rapid construction of both special-purpose and general analysis programs. PAL version 1.1 consists of 145 public classes or interfaces in 13 packages, including classes for models of character evolution, maximum-likelihood estimation, and the coalescent, with a total of more than 27000 lines of code. The PAL project is set up as a collaborative project to facilitate contributions from other researchers. AVAILIABILTY: The program is free and is available at http://www.pal-project.org. It requires Java 1.1 or later. PAL is licensed under the GNU General Public License.
Space Science Outreach in the Virtual World of Second Life
NASA Astrophysics Data System (ADS)
Crider, Anthony W.; International Spaceflight Museum
2006-12-01
The on-line "game" of Second Life allows users to construct a highly detailed and customized environment. Users often pool talents and resources to construct virtual islands that focus on their common interest. One such group has built the International Spaceflight Museum, committed to constructing and displaying accurate models of rockets, spacecraft, telescopes, and planetariums. Current exhibits include a Saturn V rocket, a Viking lander on Mars, Spaceship One, the New Horizons mission to the Kuiper Belt, and a prototype of the Orion crew exploration vehicle. This museum also hosts public lectures, shuttle launch viewings, and university astronomy class projects. In this presentation, I will focus on how space science researchers and educators may take advantage of this new resource as a means to engage the public.
23 CFR 636.119 - How does this part apply to a project developed under a public-private partnership?
Code of Federal Regulations, 2012 CFR
2012-04-01
... OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.119 How... engineering service contracts, 23 CFR part 635 for construction contracts and the requirements of this part...
NASA Astrophysics Data System (ADS)
Marhani, M. A.; Muksain, M. A. S.
2018-02-01
Malaysia has developed Green Building Index (GBI) as the green rating tool for buildings and townships to encourage sustainability in the construction industry. Understanding the roles and tasks of a contractor is essential in accomplishing the GBI assessment on a green building project. However, there are challenges in adapting the GBI. The objective of this paper is to identify the knowledge of contractor for each area of assessments in GBI’s checklist. Data were collected through the questionnaire surveys to the selected contractors, which were involved in GBI projects. The findings revealed that most of the respondents agreed and acknowledged the impact of each criterion in the assessment. Thus, it is highly recommended to educate and change the public perception on the awareness of the green building. Aside, more research and development (R&D) process should be encouraged to accelerate the GBI certificate implementation in the construction industry. In conclusion, proper education training, more legislative and financial framework are essential for the future of green building projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dellinger, M.; Allen, E.
A unique public/private partnership of local, state, federal and corporate stakeholders are constructing the world`s first wastewater-to-electricity system at The Geysers. A rare example of a genuinely {open_quotes}sustainable{close_quotes} energy system, three Lake County communities will recycle their treated wastewater effluent through the southeast portion of the The Geysers steamfield to produce approximately 625,000 MWh annually from six existing geothermal power plants. In effect, the communities` effluent will produce enough power to indefinitely sustain their electric needs, along with enough extra power for thousands of other California consumers. Because of the project`s unique sponsorship, function and environmental impacts, its implementation hasmore » required: (1) preparation of a consolidated state environmental impact report (EIR) and federal environmental impact statement (EIS), and seven related environmental agreements and management plans; (2) acquisition of 25 local, state, and federal permits; (3) negotiation of six federal and state financial assistance agreements; (4) negotiation of six participant agreements on construction, operation and financing of the project, and (5) acquisition of 163 easements from private land owners for pipeline construction access and ongoing maintenance. The project`s success in efficiently and economically completing these requirements is a model for geothermal innovation and partnering throughout the Pacific Rim and elsewhere internationally.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dellinger, M.; Allen, E.
A unique public/private partnership of local, state, federal, and corporate stakeholders are constructing the world`s first wastewater-to-electricity system at The Geysers. A rare example of a genuinely {open_quotes}sustainable{close_quote} energy system, three Lake County communities will recycle their treated wastewater effluent through the southeast portion of The Geysers steamfield to produce approximately 625,000 MWh annually from six existing geothermal power plants. In effect, the communities` effluent will produce enough power to indefinitely sustain their electric needs, along with enough extra power for thousands of other California consumers. Because of the project`s unique sponsorship, function, and environmental impacts, its implementation has required:more » (1) preparation of a consolidated state environmental impact report (EIR) and federal environmental impact statement (EIS), and seven related environmental agreements and management plans; (2) acquisition of 25 local, state, and federal permits; (3) negotiation of six federal and state financial assistance agreements; (4) negotiation of six participant agreements on construction, operation, and financing of the project; and (5) acquisition of 163 easements from private land owners for pipeline construction access and ongoing maintenance. The project`s success in efficiently and economically completing these requirements is a model for geothermal innovation and partnering throughout the Pacific Rim and elsewhere internationally.« less
Perkins, Robert A; Hargesheimer, John; Vaara, Leah
2008-09-01
During a repair and reconstruction project of an unpaved highway in a remote region of Alaska, workers discovered, after construction had commenced, that the materials used from a local material site contained asbestos (variously described as tremolite or actinolite). The regional geology indicated the presence of ultramafic rock, which often contains asbestos. Evaluation of asbestos exposure to workers, their equipment, and living quarters was required, as was the possible future exposure of workers and the general public to asbestos already used in the roadway construction. In addition, a decision was needed on whether to use materials from the contaminated site in the future. Of the almost 700 breathing zone air monitoring samples taken of the workers, 3% of the samples indicated exposures at or near 0.1 f/cc by the National Institute for Occupational Safety and Health (NIOSH) 7400 phase contrast microscopy (PCM) procedure. Thirty-six of the PCM samples underwent transmission electron microscopy (TEM) analysis by the NIOSH 7402 procedure, which indicated that about 40% of the fibers were asbestos. After classifying samples by tasks performed by workers, analysis indicated that workers, such as road grader operators who ground or spread materials, had the highest exposures. Also, monitoring results indicated motorist exposure to be much less than 0.1 f/cc. The design phase of any proposed construction project in regions that contain ultramafic rock must consider the possibility of amphibole contamination of roadway materials, and budget for exploration and asbestos analysis of likely materials sites.
Fearnside, P M
2001-03-01
Brazil's Tucuruí Dam provides valuable lessons for improving decision-making on major public works in Amazonia and elsewhere. Together with social impacts, which were reviewed in a companion paper, the project's environmental costs are substantial. Monetary costs include costs of construction and maintenance and opportunity costs of natural resources (such as timber) and of the money invested by the Brazilian government. Environmental costs include forest loss, leading to both loss of natural ecosystems and to greenhouse gas emissions. Aquatic ecosystems are heavily affected by the blockage of fish migration and by creation of anoxic environments. Decay of vegetation left in the reservoir creates anoxic water that can corrode turbines, as well as producing methane and providing conditions for methylation of mercury. Defoliants were considered for removing forest in the submergence area but plans were aborted amid a public controversy. Another controversy surrounded impacts of defoliants used to prevent regrowth along the transmission line. Mitigation measures included archaeological and faunal salvage and creation of a "gene bank" on an island in the reservoir. Decision-making in the case of Tucuruí was virtually uninfluenced by environmental studies, which were done concurrently with construction. The dam predates Brazil's 1986 requirement of an Environmental Impact Assessment. Despite limitations, research results provide valuable information for future dams. Extensive public-relations use of the research effort and of mitigation measures such as faunal salvage were evident. Decision-making was closely linked to the influence of construction firms, the military, and foreign financial interests in both the construction project and the use of the resulting electrical power (most of which is used for aluminum smelting). Social and environmental costs received virtually no consideration when decisions were made, an outcome facilitated by a curtain of secrecy surrounding many aspects of the project. Despite improvements in Brazil's system of environmental impact assessment since the Tucuruí reservoir was filled in 1984, many essential features of the decision-making system remain unchanged.
A Systems Approach to Military Construction.
1982-11-01
Unclassi fled I150. OECL ASSI F1C ATI ON/ DOWNGRADING I SCHEDULE IS. DISYR1EUTION STATEMENT (ot this Repo"t) Approved for public release; distribution...30 Procurement Alternatives 30 Design Alternatives 33 Preconcept Control Data 34 AE Selection Procedure 36 Scheduling 40 Cost Estimating 44 4...data, scheduling , and cost estimating. The objectives of project coordination for a systems-oriented project do not differ from those of a
State Revolving Fund American Iron and Steel (AIS) Requirement
The AIS provision requires CWSRF and DWSRF assistance recipients to use iron and steel products that are produced in the U.S. It applies to projects for the construction, alteration, maintenance, or repair of a public water system or treatment work.
THE PACE OF ECOSYSTEM DEVELOPMENT OF CONSTRUCTED SPARTINA ALTERNIFLORA MARSHES. (R826111)
The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...
Teacher's Guide to Career Education; Project SPAN.
ERIC Educational Resources Information Center
Turpin, Jerry; Bell, Lorraine P.
The teacher's guide is intended for use in conjunction with 15-minute instructional television lessons featuring occupational clusters (construction, communications and media, business and office, health, industrial, transportation, public and personal services, consumer and homemaking, marketing and distribution), for fourth, fifth, and sixth…
home about peer news events research products laboratories publications nisee b.i.p. members Engineering Services is Hiring Bridge Design and Bridge Construction Engineers 05/16/18 - PEER Research Research Project Highlight: "Dissipative Base Connections for Moment Frame Structures in Airports and
Jaillon, L; Poon, C S; Chiang, Y H
2009-01-01
As Hong Kong is a compact city with limited available land and high land prices, the construction of high-rise buildings is prevalent. The construction industry produces a significant amount of building waste. In 2005, about 21.5 million tonnes of construction waste were generated, of which 11% was disposed of in landfills and 89% in public filling areas. At the present rate, Hong Kong will run out of both public filling areas and landfill space within the next decade. The government is taking action to tackle the problem, such as by introducing a construction waste landfill charge, and promoting prefabrication to reduce on-site waste generation. This paper reports an ongoing study on the use of prefabrication in buildings and its impact on waste reduction in Hong Kong. A questionnaire survey was administered to experienced professionals, and case studies of recently completed building projects were conducted. The results revealed that construction waste reduction is one of the major benefits when using prefabrication compared with conventional construction. The average wastage reduction level was about 52%. This implies that a wider use of prefabrication could considerably reduce construction waste generation in Hong Kong and alleviate the burdens associated with its management.
Dynamic Metabolic Model Building Based on the Ensemble Modeling Approach
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liao, James C.
2016-10-01
Ensemble modeling of kinetic systems addresses the challenges of kinetic model construction, with respect to parameter value selection, and still allows for the rich insights possible from kinetic models. This project aimed to show that constructing, implementing, and analyzing such models is a useful tool for the metabolic engineering toolkit, and that they can result in actionable insights from models. Key concepts are developed and deliverable publications and results are presented.
Heinrich, Katie M.; Lightner, Joseph; Oestman, Katherine B.; Kaczynski, Andrew T.
2014-01-01
Introduction Trails are associated with increased physical activity; however, little is known about the process of building trails by various types of organizations. From 2005 through 2012 the Sunflower Foundation: Health Care for Kansans (Sunflower) funded multiple organizations to construct 70 trails of varying lengths and surfaces in municipalities, schools, and communities across Kansas. The purpose of this study was to assess the process of developing and implementing community trail projects across Kansas with funding from a public foundation. Methods In 2012, we stratified funded organizations by type and conducted proportional random sampling to select 20 key informants from those organizations to participate in structured telephone interviews. Interviews were recorded and transcribed verbatim. Two researchers coded interview transcripts according to issues identified by participants. Results Issues associated with trail-building identified as important were collaboration among groups, unexpected construction costs, champions for the project, and level of difficulty of construction. Participants indicated that trails facilitated physical activity. Trails were integrated into communities through events such as walking events and other promotional efforts; these efforts were thought to increase trail use. The perceived outcomes of building the trails included providing the community with a physical activity resource, inspiring the community to start additional trail projects, and increasing the physical activity of local residents. Conclusion Sunflower’s funding was instrumental in developing trail projects to provide new physical activity resources across Kansas. Public health practitioners seeking to increase physical activity should seek funding from foundations that focus on health. PMID:25427316
Causal Factors of Corruption in Construction Project Management: An Overview.
Owusu, Emmanuel Kingsford; Chan, Albert P C; Shan, Ming
2017-11-11
The development of efficient and strategic anti-corruption measures can be better achieved if a deeper understanding and identification of the causes of corruption are established. Over the past years, many studies have been devoted to the research of corruption in construction management (CM). This has resulted in a significant increase in the body of knowledge on the subject matter, including the causative factors triggering these corrupt practices. However, an apropos systematic assessment of both past and current studies on the subject matter which is needful for the future endeavor is lacking. Moreover, there is an absence of unified view of the causative factors of corruption identified in construction project management (CPM). This paper, therefore, presents a comprehensive review of the causes of corruption from selected articles in recognized construction management journals to address the mentioned gaps. A total number of 44 causes of corruption were identified from 37 publications and analyzed in terms of existing causal factors of corruption, annual trend of publications and the thematic categorization of the identified variables. The most identifiable causes were over close relationships, poor professional ethical standards, negative industrial and working conditions, negative role models and inadequate sanctions. A conceptual framework of causes of corruption was established, after categorizing the 44 variables into five unique categories. In descending order, the five constructs are Psychosocial-Specific Causes, Organizational-Specific Causes, Regulatory-Specific Causes, Project-Specific Causes and Statutory-Specific Causes. This study extends the current literature of corruption research in construction management and contributes to a deepened understanding of the causal instigators of corruption identified in CPM. The findings from this study provide valuable information and extended knowledge to industry practitioners and policymakers as well as anti-corruption agencies in the formulation and direction of anti-corruption measures. To corruption researchers in CM, this study is vital for further research.
Installation of 200 kW UTC PC-25 Natural Gas Fuel Cell At City of Anaheim Police Station
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dina Predisik
2006-09-15
The City of Anaheim Public Utilities Department (Anaheim) has been providing electric service to Anaheim residents and businesses for over a century. As a city in a high-growth region, identifying sources of reliable energy to meet demand is a constant requirement. Additionally, as more power generation is needed, locating generating stations locally is a difficult proposition and must consider environmental and community impacts. Anaheim believes benefits can be achieved by implementing new distributed generation technologies to supplement central plants, helping keep pace with growing demand for power. If the power is clean, then it can be delivered with minimal environmentalmore » impact. Anaheim started investigating fuel cell technology in 2000 and decided a field demonstration of a fuel cell power plant would help determine how the technology can best serve Anaheim. As a result, Anaheim completed the project under this grant as a way to gain installation and operating experience about fuel cells and fuel cell capabilities. Anaheim also hopes to help others learn more about fuel cells by providing information about this project to the public. Currently, Anaheim has hosted a number of requested tours at the project site, and information about the project can be found on Anaheim Public Utilities RD&D Project website. The Anaheim project was completed in four phases including: research and investigation, purchase, design, and construction. The initial investigative phase started in 2000 and the construction of the project was completed in February 2005. Since acceptance and startup of the fuel cell, the system has operated continuously at an availability of 98.4%. The unit provides an average of about 4,725 kilowatthours a day to the Utilities' generation resources. Anaheim is tracking the operation of the fuel cell system over the five-year life expectancy of the fuel stack and will use the information to determine how fuel cells can serve Anaheim as power generators.« less
NASA Astrophysics Data System (ADS)
Kazaryan, Ruben
2018-03-01
Problems of accounting and reporting of net assets and the procedure of their formation taking into account the specifics of the economic and legal status of property of a non-commercial autonomous institution are some of the most controversial in the accounting for entities of the public sector. The study focuses on justification of accounting rules for net assets of public sector entities. The methods used in the study are as follows: comparison, synthesis, analysis, logical approach, and system approach. The article examines legal aspects and specifics of recognition of assets of public sector entities in accordance with IPSAS standards (International Public Sector Accounting Standards are a set of accounting standards issued by IPSASB (Council for International Financial Reporting Standards for Public Sector Organizations) used by state-owned enterprises worldwide in preparation of financial statements as of the 31st of August, 2015. The most crucial factor in the modeling of key performance indicators of the system-target approach to estimation of the sustainability level of net assets on the basis of IPSAS is a multicriterial evaluation of the basic management strategy for quality system elements used in operational and strategic planning projects operations in high-rise construction. We offer an alternative evaluation of assets due to be returned to the right holder (the state controller) in the event of liquidation of a public sector entity.
Energy Efficient Buildings, Salt Lake County, Utah
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barnett, Kimberly
2012-04-30
Executive Summary Salt Lake County's Solar Photovoltaic Project - an unprecedented public/private partnership Salt Lake County is pleased to announce the completion of its unprecedented solar photovoltaic (PV) installation on the Calvin R. Rampton Salt Palace Convention Center. This 1.65 MW installation will be one the largest solar roof top installations in the country and will more than double the current installed solar capacity in the state of Utah. Construction is complete and the system will be operational in May 2012. The County has accomplished this project using a Power Purchase Agreement (PPA) financing model. In a PPA model amore » third-party solar developer will finance, develop, own, operate, and maintain the solar array. Salt Lake County will lease its roof, and purchase the power from this third-party under a long-term Power Purchase Agreement contract. In fact, this will be one of the first projects in the state of Utah to take advantage of the recent (March 2010) legislation which makes PPA models possible for projects of this type. In addition to utilizing a PPA, this solar project will employ public and private capital, Energy Efficiency and Conservation Block Grants (EECBG), and public/private subsidized bonds that are able to work together efficiently because of the recent stimulus bill. The project also makes use of recent changes to federal tax rules, and the recent re-awakening of private capital markets that make a significant public-private partnership possible. This is an extremely innovative project, and will mark the first time that all of these incentives (EECBG grants, Qualified Energy Conservation Bonds, New Markets tax credits, investment tax credits, public and private funds) have been packaged into one project. All of Salt Lake County's research documents and studies, agreements, and technical information is available to the public. In addition, the County has already shared a variety of information with the public through webinars, site tours, presentations, and written correspondence.« less
The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...
Lease-Purchase Program Applicant Handbook.
ERIC Educational Resources Information Center
California State Dept. of General Services, Sacramento. Office of Public School Construction.
This manual guides applicants through the process of acquiring and managing California state funds for public school facility construction projects. Section 1 focuses on determining eligibility and on preparing application packages for Phase P approval and/or apportionment. Section 2 examines regulations and required forms for selecting school…
24 CFR 941.304 - Full proposal content.
Code of Federal Regulations, 2013 CFR
2013-04-01
... description of public improvements needed to ensure the viability of the proposed project with a description... in occupancy and operation that contribute to an overall objective of ending the social and economic isolation of low income people and promoting their economic independence; (n) New construction certification...
24 CFR 941.304 - Full proposal content.
Code of Federal Regulations, 2011 CFR
2011-04-01
... description of public improvements needed to ensure the viability of the proposed project with a description... in occupancy and operation that contribute to an overall objective of ending the social and economic isolation of low income people and promoting their economic independence; (n) New construction certification...
24 CFR 941.304 - Full proposal content.
Code of Federal Regulations, 2012 CFR
2012-04-01
... description of public improvements needed to ensure the viability of the proposed project with a description... in occupancy and operation that contribute to an overall objective of ending the social and economic isolation of low income people and promoting their economic independence; (n) New construction certification...
24 CFR 941.304 - Full proposal content.
Code of Federal Regulations, 2010 CFR
2010-04-01
... description of public improvements needed to ensure the viability of the proposed project with a description... in occupancy and operation that contribute to an overall objective of ending the social and economic isolation of low income people and promoting their economic independence; (n) New construction certification...
The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...
SIMULATING THE IMPACTS OF ROAD CONSTRUCTION AND FOREST HARVESTING ON HYDROLOGIC RESPONSE. (R825792)
The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, K.M.
1983-07-01
The number of workers currently involved in the various aspects of geothermal development in the Geysers are identified. Using two different development scenarios, projections are made for the number of power plants needed to reach the electrical generation capacity of the steam resource in the Geysers. The report also projects the cumulative number of workers needed to develop the steam field and to construct, operate, and maintain these power plants. Although the number of construction workers fluctuates, most are not likely to become new, permanent residents of the KGRA counties. The administrative and public service costs of geothermal development tomore » local jurisdications are examined, and these costs are compared to geothermal revenues accruing to the local governments. Revenues do not cover the immediate fiscal needs resulting from increases in local road maintenance and school enrollment attributable to geothermal development. Several mitigation options are discussed and a framework presented for calculating mitigation costs for school and road impacts.« less
Proposed Columbia Wind Farm No. 1 : Final Environmental Impact Statement, Joint NEPA/SEPA.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Klickitat County
1995-09-01
CARES proposes to construct and operate the 25 megawatt Columbia Wind Farm No. 1 (Project) in the Columbia Hills area of Klickitat County, Washington known as Juniper Point. Wind is not a constant resource and based on the site wind measurement data, it is estimated that the Project would generate approximately 7 average annual MWs of electricity. BPA proposes to purchase the electricity generated by the Project. CARES would execute a contractual agreement with a wind developer, to install approximately 91 wind turbines and associated facilities to generate electricity. The Project`s construction and operation would include: install concrete pier foundationsmore » for each wind turbine; install 91 model AWT-26 wind turbines using 43 m high guyed tubular towers on the pier foundations; construct a new 115/24-kv substation; construct a 149 m{sup 2} steel operations and maintenance building; install 25 pad mount transformers along the turbine access roads; install 4.0 km of underground 24 kv power collection lines to collect power from individual turbines to the end of turbine strings; install 1.2 km of underground communication and transmission lines from each turbine to a pad mount transformer; install 5.6 km of 24 kv wood pole transmission lines to deliver electricity from the pad mount transformers to the Project substation; install 3.2 km of 115 kv wood pole transmission lines to deliver electricity from the Project substation to the Public Utility District No. 1 of Klickitat County(PUD)115 kv Goldendale line; interconnect with the BPA transmission system through the Goldendale line and Goldendale substation owned by the PUD; reconstruct, upgrade, and maintain 8.0 km of existing roads; construct and maintain 6.4 km of new graveled roads along the turbine strings and to individual turbines; and install meteorological towers guyed with rebar anchors on the Project site.« less
PBO Facility Construction: Basin and Range and Rocky Mountain Regions Status
NASA Astrophysics Data System (ADS)
Friesen, B.; Jenkins, F.; Kasmer, D.; Feaux, K.
2007-12-01
The Plate Boundary Observatory (PBO), part of the larger NSF-funded EarthScope project, will study the three- dimensional strain field resulting from active plate boundary deformation across the western United States. PBO is a large construction project involving the reconnaissance, permitting, installation, documentation, and maintenance of 875 permanent GPS stations in five years. 163 of these stations lie within the Basin and Range and Rocky Mountain Regions consisting of the states of Montana, Idaho, Nevada, Utah, Wyoming, Colorado, New Mexico, and Arizona. During the fourth year of the project, the Basin and Range and Rocky Mountain regions of PBO completed reconnaissance and nearly all permitting activities, and maintained a fast pace of station installations. The fall of 2006 and spring of 2007 were devoted to the construction of a large push of 50 stations, most located on Bureau of Land Management controlled public lands in Nevada. This transect is located along Highway 50 and will profile the extension of the Basin and Range province. The Yellowstone area, including surrounding National Parks and Forests was the target of summer 2007, during which time 10 remote stations with difficult logistics were installed. To date, construction is complete for 135 of 163 GPS stations.
The Development of a "Neighborhood in Solidarity" in Switzerland.
Zwygart, Marion; Plattet, Alain; Ammor, Sarah
2017-01-01
This article presents a case study based on the "Neighborhood in Solidarity" (NS) methodology to illustrate its application in a locality of 8,000 inhabitants in Switzerland. This specific project is proposed to exemplify the global aim of the NS methodology. That aim is to increase the integration of elderly persons in societies in order to improve their quality of life. The case study demonstrates the enhancement of the capacity of the older people to remain actively engaged in their neighborhood. The article focuses on the creation of an autonomous community of empowered older people who can resolve their own problems after a 5-year project. The construction of the local community is presented throughout the six steps of the methodology: (1) preliminary analysis, (2) diagnostic, (3) construction, (4) project design, (5) project implementation, and (6) empowerment and with three degrees of involvement (community, participative, and integrative involvement). Performance and output indicators, quality indicators, and social determinants of health assess the development of the local project. The impacts of the projects which are illustrated in this specific example motivated this publication to inspire practitioners from other countries.
ERIC Educational Resources Information Center
Salinas Vacca, Yakelin
2014-01-01
This paper reports on an exploratory, descriptive, and interpretive study in which the roles of discussion boards, the students, the teacher, and the monitors were explored as they constructed a collaborative class project in a virtual environment. This research was conducted in the virtual program of a Colombian public university. Data were…
Making YOHKOH SXT Images Available to the Public: The YOHKOH Public Outreach Project
NASA Astrophysics Data System (ADS)
Larson, M. B.; McKenzie, D.; Slater, T.; Acton, L.; Alexander, D.; Freeland, S.; Lemen, J.; Metcalf, T.
1999-05-01
The NASA funded Yohkoh Public Outreach Project (YPOP) provides public access to high quality Yohkoh SXT data via the World Wide Web. The products of this effort are available to the scientific research community, K-12 schools, and informal education centers including planetaria, museums, and libraries. The project utilizes the intrinsic excitement of the SXT data, and in particular the SXT movies, to develop science learning tools and classroom activities. The WWW site at URL: http://solar.physics.montana.edu/YPOP/ uses a movie theater theme to highlight available Yohkoh movies in a format that is entertaining and inviting to non-scientists. The site features informational tours of the Sun as a star, the solar magnetic field, the internal structure and the Sun's general features. The on-line Solar Classroom has proven very popular, showcasing hand-on activities about image filtering, the solar cycle, satellite orbits, image processing, construction of a model Yohkoh satellite, solar rotation, measuring sunspots and building a portable sundial. The YPOP Guestbook has been helpful in evaluating the usefulness of the site with over 300 detailed comments to date.
Sousa, Eunice; Quintino, Victor; Palhas, Jael; Rodrigues, Ana Maria; Teixeira, José
2016-01-01
Ponds provide vital ecological services. They are biodiversity hotspots and important breading sites for rare and endangered species, including amphibians and dragonflies. Nevertheless, their number is decreasing due to habitat degradation caused by human activities. The “Ponds with Life” environmental education project was developed to raise public awareness and engagement in the study of ponds by promoting the direct contact between the public and nature, researchers and pedagogical hands-on exploration activities. A pre-post- project survey was set-up to assess the effects of the project on the environmental consciousness, knowledge and attitude changes towards ponds and the associated biodiversity of school students aged 15 to 18. The survey questions were based on Likert scales and their pre-post project comparisons used an innovative multivariate hypothesis testing approach. The results showed that the project improved the students’ knowledge and attitudes towards ponds and associated biodiversity, especially the amphibians. Ponds can be found or constructed in urban areas and despite small sized, they proved to be interesting model habitats and living laboratories to foster environmental education, by encompassing a high number of species and a fast ecological succession. PMID:27148879
Sousa, Eunice; Quintino, Victor; Palhas, Jael; Rodrigues, Ana Maria; Teixeira, José
2016-01-01
Ponds provide vital ecological services. They are biodiversity hotspots and important breading sites for rare and endangered species, including amphibians and dragonflies. Nevertheless, their number is decreasing due to habitat degradation caused by human activities. The "Ponds with Life" environmental education project was developed to raise public awareness and engagement in the study of ponds by promoting the direct contact between the public and nature, researchers and pedagogical hands-on exploration activities. A pre-post- project survey was set-up to assess the effects of the project on the environmental consciousness, knowledge and attitude changes towards ponds and the associated biodiversity of school students aged 15 to 18. The survey questions were based on Likert scales and their pre-post project comparisons used an innovative multivariate hypothesis testing approach. The results showed that the project improved the students' knowledge and attitudes towards ponds and associated biodiversity, especially the amphibians. Ponds can be found or constructed in urban areas and despite small sized, they proved to be interesting model habitats and living laboratories to foster environmental education, by encompassing a high number of species and a fast ecological succession.
1990-06-01
five (5) years, not listed above, that were given formal performance ratings by Federal, state, or municipal agencies, or private companies. The format...Office Commissioned Corps, Public Health Service * Chief Mercado - Manpower Management - Naval Health Sciences Education and Training Command * Mrs...Secretary of the Director, Naval Dental School * Mr. William Fraunhurst - Director, Office Commissioned Corps, Putlic Health Service * Chief Mercado
Code of Federal Regulations, 2010 CFR
2010-07-01
... consideration the economic and technical feasibility of each project. (a) Preservation. (1) A property will be... related new construction will be undertaken in such a manner that, if removed in the future, the essential... such reconstruction is essential to the public understanding of the property. (2) Reconstruction of a...
23 CFR 635.105 - Supervising agency.
Code of Federal Regulations, 2012 CFR
2012-04-01
... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.105 Supervising agency. (a) The STD has responsibility... authorizing performance of the work by a local public agency or other Federal agency. The STD shall be... projects are completed in conformance with approved plans and specifications. (b) Although the STD may...
23 CFR 635.105 - Supervising agency.
Code of Federal Regulations, 2013 CFR
2013-04-01
... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.105 Supervising agency. (a) The STD has responsibility... authorizing performance of the work by a local public agency or other Federal agency. The STD shall be... projects are completed in conformance with approved plans and specifications. (b) Although the STD may...
23 CFR 635.105 - Supervising agency.
Code of Federal Regulations, 2014 CFR
2014-04-01
... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.105 Supervising agency. (a) The STD has responsibility... authorizing performance of the work by a local public agency or other Federal agency. The STD shall be... projects are completed in conformance with approved plans and specifications. (b) Although the STD may...
23 CFR 635.105 - Supervising agency.
Code of Federal Regulations, 2011 CFR
2011-04-01
... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.105 Supervising agency. (a) The STD has responsibility... authorizing performance of the work by a local public agency or other Federal agency. The STD shall be... projects are completed in conformance with approved plans and specifications. (b) Although the STD may...
Surveying School Facilities Needs.
ERIC Educational Resources Information Center
Weichel, Harry J.; Dennell, James
1990-01-01
Ralston (Nebraska) Public School District's communitywide survey helped set school facilities priorities while keeping the district's finite resources firmly in mind. With an outline of maintenance costs for the next 10 years, the district can develop a strategic construction schedule. The board also has the option of financing projects through a…
25 CFR 137.8 - Indian lands excluded.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 1 2012-04-01 2011-04-01 true Indian lands excluded. 137.8 Section 137.8 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES REIMBURSEMENT OF CONSTRUCTION COSTS, SAN CARLOS INDIAN IRRIGATION PROJECT, ARIZONA § 137.8 Indian lands excluded. This public notice...
25 CFR 137.8 - Indian lands excluded.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false Indian lands excluded. 137.8 Section 137.8 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES REIMBURSEMENT OF CONSTRUCTION COSTS, SAN CARLOS INDIAN IRRIGATION PROJECT, ARIZONA § 137.8 Indian lands excluded. This public notice...
25 CFR 137.8 - Indian lands excluded.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Indian lands excluded. 137.8 Section 137.8 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES REIMBURSEMENT OF CONSTRUCTION COSTS, SAN CARLOS INDIAN IRRIGATION PROJECT, ARIZONA § 137.8 Indian lands excluded. This public notice...
25 CFR 137.8 - Indian lands excluded.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Indian lands excluded. 137.8 Section 137.8 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES REIMBURSEMENT OF CONSTRUCTION COSTS, SAN CARLOS INDIAN IRRIGATION PROJECT, ARIZONA § 137.8 Indian lands excluded. This public notice...
25 CFR 137.8 - Indian lands excluded.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false Indian lands excluded. 137.8 Section 137.8 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES REIMBURSEMENT OF CONSTRUCTION COSTS, SAN CARLOS INDIAN IRRIGATION PROJECT, ARIZONA § 137.8 Indian lands excluded. This public notice...
Apprenticeship: A Partnership Project. Final Report.
ERIC Educational Resources Information Center
Lawton, Marcy F.
An 18-month demonstration program was conducted by the Northern Virginia Cooperative Vocational Education Department of the Fairfax County Public Schools, in partnership with the Virginia Merit Shop Foundation, to recruit and train apprentices for eight construction trades. Emphasis was placed on recruiting women, members of minority groups, and…
Libraries and Literacy in Ecological Perspective
ERIC Educational Resources Information Center
Sensenig, Victor J.
2012-01-01
This study investigated the nature of the literacy environment that public libraries construct and how they share the project of children's literacy development with homes and schools. It focuses on library programs for children, particularly story times. Its data came from observations of library activities, interviews with librarians and…
Code of Federal Regulations, 2010 CFR
2010-01-01
... TERMS FOR ASSISTANCE AGREEMENTS THAT INCLUDE FUNDS UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009, PUBLIC LAW 111-5 Buy American Requirement Under Section 1605 of the American Recovery and... appropriated or otherwise made available by the Recovery Act may be used for a project for the construction...
DOT National Transportation Integrated Search
1992-12-01
The Quality Functional Deployment (QFD) method was used for the design of the Independent Locking Securement (ILS) System, developed by the Oregon State University. The project entailed the design, construction, and testing of the ILS system prototyp...
The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...
15 CFR 2301.6 - Amount of Federal funding.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Amount of Federal funding. 2301.6... TELECOMMUNICATIONS FACILITIES PROGRAM Application Requirements § 2301.6 Amount of Federal funding. (a) Planning... a public telecommunications construction project. (1) Seventy-five (75) percent Federal funding will...
15 CFR 2301.6 - Amount of Federal funding.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Amount of Federal funding. 2301.6... TELECOMMUNICATIONS FACILITIES PROGRAM Application Requirements § 2301.6 Amount of Federal funding. (a) Planning... a public telecommunications construction project. (1) Seventy-five (75) percent Federal funding will...
15 CFR 2301.6 - Amount of Federal funding.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Amount of Federal funding. 2301.6... TELECOMMUNICATIONS FACILITIES PROGRAM Application Requirements § 2301.6 Amount of Federal funding. (a) Planning... a public telecommunications construction project. (1) Seventy-five (75) percent Federal funding will...
15 CFR 2301.6 - Amount of Federal funding.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Amount of Federal funding. 2301.6... TELECOMMUNICATIONS FACILITIES PROGRAM Application Requirements § 2301.6 Amount of Federal funding. (a) Planning... a public telecommunications construction project. (1) Seventy-five (75) percent Federal funding will...
15 CFR 2301.6 - Amount of Federal funding.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Amount of Federal funding. 2301.6... TELECOMMUNICATIONS FACILITIES PROGRAM Application Requirements § 2301.6 Amount of Federal funding. (a) Planning... a public telecommunications construction project. (1) Seventy-five (75) percent Federal funding will...
Biocontainment laboratory risk assessment: perspectives and considerations.
Patterson, Amy; Fennington, Kelly; Bayha, Ryan; Wax, Diane; Hirschberg, Rona; Boyd, Nancy; Kurilla, Michael
2014-07-01
The ability to respond to public health emergencies involving infectious diseases as well as our ability to adequately prepare for as yet unknown or unrecognized emerging infectious diseases requires suitable facilities within which scientific investigations can take place. To ensure the safe conduct of such investigations so that laboratory workers and the general public are protected from potential consequences of accidental or intentional release of high consequence pathogens, special containment facilities have been designed and constructed. Evaluation of the adequacy of containment for these types of investigations requires a risk assessment (RA) as part of the overall construction project for these types of laboratories. A discussion of the RA process along with considerations that impact the design of such studies and the overall results is presented. Published 2014. This article is a US Government work and is in the public domain in the USA.
The Public Sector Construction Industry: Analysis of Single-Project Partnering
1992-12-22
thesis advisor, Dr. Fred Moavenzadeh for his guidance and encouragement. Colonel Larry S. Bonine , U.S. Army (Retired) and the members of his Partnering...PROJECT (CkG) ENGINEERS MANAGERS PR::JECT PARINERING TEAM Figure 4-4. Central Artery/Tunnel Organizational Chart. 116 MR. Larry Bonine an employee of the...joint venture team. MR. Bonine is an ex-Army Colonel and was the Corps District Engineer in Mobile, Alabama who oversaw the Oliver Lock and Dam and
2006-06-01
SPONSOR/MONITOR’S ACRONYM( S ) 11. SPONSOR/MONITOR’S REPORT NUMBER( S ) 12. DISTRIBUTION /AVAILABILITY STATEMENT Approved for public release; distribution ...NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) Weston Solutions...Inc,711 E. Monument Avenue,Dayton,OH,45402 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 10
The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...
Waste and Abuse: Public School Roofing Projects.
ERIC Educational Resources Information Center
2000
This report details the results of a comprehensive inquiry by New Jersey into one aspect of school construction, the repair and replacement of roof systems, which represents the single most expensive and integral component of a school's physical structure. The investigation began in late 1997 after confidential complaints suggested abuse in the…
The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...
Accidents of Electrical and Mechanical Works for Public Sector Projects in Hong Kong.
Wong, Francis K W; Chan, Albert P C; Wong, Andy K D; Hon, Carol K H; Choi, Tracy N Y
2018-03-10
A study on electrical and mechanical (E&M) works-related accidents for public sector projects provided the opportunity to gain a better understanding of the causes of accidents by analyzing the circumstances of all E&M works accidents. The research aims to examine accidents of E&M works which happened in public sector projects. A total of 421 E&M works-related accidents in the "Public Works Programme Construction Site Safety and Environmental Statistics" (PCSES) system were extracted for analysis. Two-step cluster analysis was conducted to classify the E&M accidents into different groups. The results identified three E&M accidents groups: (1) electricians with over 15 years of experience were prone to 'fall of person from height'; (2) electricians with zero to five years of experience were prone to 'slip, trip or fall on same level'; (3) air-conditioning workers with zero to five years of experience were prone to multiple types of accidents. Practical measures were recommended for each specific cluster group to avoid recurrence of similar accidents. The accident analysis would be vital for industry practitioners to enhance the safety performance of public sector projects. This study contributes to filling the knowledge gap of how and why E&M accidents occur and promulgating preventive measures for E&M accidents which have been under researched.
Accidents of Electrical and Mechanical Works for Public Sector Projects in Hong Kong
Wong, Francis K. W.; Chan, Albert P. C.; Wong, Andy K. D.; Choi, Tracy N. Y.
2018-01-01
A study on electrical and mechanical (E&M) works-related accidents for public sector projects provided the opportunity to gain a better understanding of the causes of accidents by analyzing the circumstances of all E&M works accidents. The research aims to examine accidents of E&M works which happened in public sector projects. A total of 421 E&M works-related accidents in the “Public Works Programme Construction Site Safety and Environmental Statistics” (PCSES) system were extracted for analysis. Two-step cluster analysis was conducted to classify the E&M accidents into different groups. The results identified three E&M accidents groups: (1) electricians with over 15 years of experience were prone to ‘fall of person from height’; (2) electricians with zero to five years of experience were prone to ‘slip, trip or fall on same level’; (3) air-conditioning workers with zero to five years of experience were prone to multiple types of accidents. Practical measures were recommended for each specific cluster group to avoid recurrence of similar accidents. The accident analysis would be vital for industry practitioners to enhance the safety performance of public sector projects. This study contributes to filling the knowledge gap of how and why E&M accidents occur and promulgating preventive measures for E&M accidents which have been under researched. PMID:29534429
CBEO:N, Chesapeake Bay Environmental Observatory as a Cyberinfrastructure Node
NASA Astrophysics Data System (ADS)
Zaslavsky, I.; Piasecki, M.; Whitenack, T.; Ball, W. P.; Murphy, R.
2008-12-01
Chesapeake Bay Environmental Observatory (CBEO) is an NSF-supported project focused on studying hypoxia in Chesapeake Bay using advanced cyberinfrastructure (CI) technologies. The project is organized around four concurrent and interacting activities: 1) CBEO:S provides science and management context for the use of CI technologies, focusing on hypoxia and its non-linear dynamics as affected by management and climate; 2) CBEO:T constructs a locally-accessible CBEO test bed prototype centered on spatio-temporal interpolation and advanced querying of model runs; 3) CBEO:N incorporates the test bed CI into national environmental observation networks, and 4) CBEO:E develops education and outreach components of the project that translate observational science for public consumption. CBEO:N activities, which are the focus of this paper, are four-fold: - constructing an online project portal to enable researchers to publish, discover, query, visualize and integrate project-related datasets of different types. The portal is based on the technologies developed within the GEON (the Geosciences Network) project, and has established the CBEO project data server as part of the GEON network of servers; * developing a CBEO node within the WATERS network, taking advantage of the CUAHSI Hydrologic Information System (HIS) Server technology that supports online publication of observation data as web services, and ontology-assisted data discovery; *developing new data structures and metadata in order to describe water quality observational data, and model run output, obtained for the Chesapeake Bay area, using data structures adopted and modified from the Observations Data Model of CUAHSI HIS; * prototyping CBEO tools that can be re-used through the portal, in particular implementing a portal version of R-based spatial interpolation tools. The paper describes recent accomplishments in these four development areas, and demonstrates how CI approaches transform research and data sharing in environmental observing systems.
Exploring Digital Encounters in the Public Arena
NASA Astrophysics Data System (ADS)
Schieck, Ava Fatah Gen.; Kostakos, Vassilis; Penn, Alan
In this chapter, we explore the types of encounters that technology enables. We consider the differences between digital and nondigital encounters through two pilot studies carried out in the city of Bath, United Kingdom. We investigate how technology can be appropriated for shared interactions that support conscious (or unconscious) social encounters, and highlight the importance of space and the role of place in providing temporal and spatial mechanisms facilitating different types of shared encounters. Here, we apply a method based on intervention through "sensing and projecting" Bluetooth names and digital identity in the public arena, and describe initial observations about people's reaction toward the projection of their Bluetooth names in public. In particular, we note the significance of constructing socially meaningful relations between people mediated by these technologies. We discuss initial results and outline issues raised in detail before finally describing the ongoing work.
[Current estate of biotechnology in Costa Rica].
Valdez, Marta; López, Rebeca; Jiménez, Luis
2004-09-01
A study was carried out on the construction of indicators in biotechnology in Costa Rica as part of the project "SYMBIOSIS, Cooperative Program for the Construction of Indicators in Biotechnology adapted to Latin American and Caribbean countries, to motivate the application and transference of industrial technologies". The study focused on two units: researchers and research projects developed in Costa Rica, between 1998 and 2002. For researchers, information was collected about indicators related to sex, age, teaching activities, number of projects, academic degree, area of speciality and number of publications. For research projects we obtained information about: speciality, sector of application, duration of projects and number of researchers per project. Very interesting results include the high participation of the women in this area of investigation (54%); the low participation of young researchers (13% younger than 30), and a high proportion of the investigators that are responsible for 4 or more projects (42%). With relation to the specialities of the projects, the majority are in the category Bio-Agro (39%) whereas in Acuaculture only 1% was found. The sectors of application with the most number of projects are: Agriculture and Livestock (37%) and Human Health (35%). The main strengthts and limitatations for the development of biotechnology in Costa Rica are discussed.
2003-08-27
KENNEDY SPACE CENTER, FLA. - Key officials are poised to cut the ribbon officially dedicating the new Security gates on Kennedy Parkway (Gate 2) and NASA Parkway (Gate 3). From left are Wally Schroeder, with Jones, Edmunds & Associates; Bobby Porter, with Oneida Construction; Daniel Tweed, NASA project manager; Jim Kennedy, Center director; and William Sample, SGS deputy program manager. The new gates were activated Aug. 1, allowing the general public to have access to the new Space Commerce Way, which will provide access to the Research Park and KSC Visitor Complex, and providing an alternate route for the general public between Titusville and Merritt Island that is accessible 24 hours a day. The gates are staffed 24 hours daily.
Benefit Evaluation of Implementing BIM in Construction Projects
NASA Astrophysics Data System (ADS)
Chou, Hui-Yu; Chen, Pei-Yu
2017-10-01
Since 2014, public construction projects in Taiwan have progressively undertaken steps to promote the use of Building Information Modelling (BIM) technology, the use of BIM has therefore become a necessity for contractors. However, issues such as the high upfront costs relating to software and hardware setup and BIM user training, combined with the difficulties of incorporating BIM into existing workflow operations and management systems, remain a challenge to contractors. Consequently, the benefits stemming from the BIM implementation in turn will affect the activeness and enthusiasm of contractors to implement BIM. While there have been previous studies abroad where the benefits relating to BIM implementation had been calculated and quantified numerically, a benefit evaluation index would require considerations for regional industry practices and characteristics. This study established a benefit evaluation index and method for the implementation of BIM suitable for contractors in Taiwan. The three main principal indexes are: (1) RCR means the effects of reducing costs associated with rework; (2) SDR & DPR mean the effects of mitigating delays that occur due to construction interface coordination or rework, as well as the effects of reducing the penalty costs associated with overdue delivery; (3) AQE means the effects of improving the ability to estimate the amounts of building materials and resources. This study also performed a benefit evaluation calculation of a real world case study construction project using the first two established indexes. The results showed a 0.16% reduction in rework costs, a 6.49% reduction in delays that occur from construction interface coordination or rework, and a 5.0% reduction in penalty costs associated with overdue deliveries. The results demonstrated the applicability of the benefit evaluation index established in this study for real world construction projects.
NASA Astrophysics Data System (ADS)
Fletcher, Alex; Yoo, Terry S.
2004-04-01
Public databases today can be constructed with a wide variety of authoring and management structures. The widespread appeal of Internet search engines suggests that public information be made open and available to common search strategies, making accessible information that would otherwise be hidden by the infrastructure and software interfaces of a traditional database management system. We present the construction and organizational details for managing NOVA, the National Online Volumetric Archive. As an archival effort of the Visible Human Project for supporting medical visualization research, archiving 3D multimodal radiological teaching files, and enhancing medical education with volumetric data, our overall database structure is simplified; archives grow by accruing information, but seldom have to modify, delete, or overwrite stored records. NOVA is being constructed and populated so that it is transparent to the Internet; that is, much of its internal structure is mirrored in HTML allowing internet search engines to investigate, catalog, and link directly to the deep relational structure of the collection index. The key organizational concept for NOVA is the Image Content Group (ICG), an indexing strategy for cataloging incoming data as a set structure rather than by keyword management. These groups are managed through a series of XML files and authoring scripts. We cover the motivation for Image Content Groups, their overall construction, authorship, and management in XML, and the pilot results for creating public data repositories using this strategy.
U.S. Coastal Flood Damage Reduction Projects: Federal Authorization and Investment Trends
NASA Astrophysics Data System (ADS)
Carter, N. T.
2015-12-01
The 2015 U.S. Environmental Protection Agency report Climate Change in the United States: Benefits of Global Action estimated the potential cumulative future economic impacts of storm surge and sea-level rise on U.S. coasts during this century at 5 trillion (2014 dollars) if no adaptation measures are implemented. These impacts drop to 0.8 trillion if investments are made in cost-effective adaptations and protections. Awareness of flood risk and its long-term fiscal impact historically has proven insufficient to motivate pre-disaster land use changes and investments in mitigation and protection. While many adaptations and protections fall largely under state and local authority, some stakeholders are interested in federal coastal flood protection projects, including projects by the U.S. Army Corps of Engineers. Since the 1950s, Congress has authorized the Corps to construct specific coastal projects. The broad vision, strategy, and priorities for the federal role in coastal flood damage reduction projects nonetheless remain ill-defined. This research analyzes (1) the authorization and appropriations trends for Corps coastal storm damage reduction projects, and (2) how Corps feasibility studies account for and address coastal flood hazards. Identified trends include: emergency appropriations for storm-damaged areas outstrip annual investments in coastal flood projects; the rate at which projects are congressionally approved for construction outpaces the rate at which construction is funded; and how coastal protection projects are evaluated in Corps feasibility studies shows variation and change in agency practices. These trends have consequences; they affect public and local expectations when projects begin providing protection benefits, and may influence investments in other adaptation measures. These trends also raise questions for policymakers at all levels and for scientists and practitioners interested in coastal flood resilience.
Community involvement in constructing village health buildings in Uganda and Sierra Leone.
Mitchell, M
1995-11-01
Three public health projects in Uganda and Sierra Leone are used to illustrate a new approach to construction of health buildings in villages. Emphasis is placed on community involvement. The health projects were comprehensive and relied on health education, employment of local village health workers, and establishment of village health committees. The objective of community involvement was described as encouragement of people to change their own diets and living conditions. This approach to primary health care is considered to be a strong basis for sustainable social development. Each of the three communities initiated the building projects slightly differently. There was a range of structures: traditional meeting halls, simple rooms with imported materials and a pit latrine, new buildings combining local and imported materials and labor, new nontraditional buildings, rehabilitated existing nontraditional buildings with imported labor and materials, and temporary mobile clinics. Community involvement was at different levels. All three projects were the result of a combined effort of national governments or mission hospitals, nongovernmental organizations, and the host community. The following should be considered before beginning construction: a suitable site, appropriate staff accommodation, the likely motivation of the host community, seasonality, local materials available, availability of skilled labor, and design. A plan of work during construction should include a building design, site supervision, transportation of local and non-local materials, unskilled labor, and skilled labor. Village health committees with or without government help would be responsible for maintenance of buildings after construction. A key feature of this approach is the assessment of the community's ability and capacity to contribute.
2006-09-01
second phase of the project was modified to incorporate a soft solution design. The plan consisted of construction of a wave diffraction mound to reduce...and local public property (that is considered as private) in the U.S. Court of Federal Claims. An RSM approach was followed in this study...representation of hard bottom (non-erodible areas), and hot-start option. M2D has been designed as a local- scale model that can be easily and quickly
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-28
... scoping meetings scheduled as follows: FERC Public Scoping Meetings Myersville Compressor Station, 7:00 Mullett Compressor Station, p.m.--Monday, November 7, 2011, 7:00 p.m.--Tuesday, November Myersville... Planned Project DTI plans to construct and operate one new compressor station in both Frederick County...
Education in Alaska. A Report to the People, FY 1986.
ERIC Educational Resources Information Center
Alaska State Dept. of Education, Juneau.
In fiscal year (FY) 1986, the Alaska State Board of Education continued to work towards its objectives of improving education in the areas of: school finance (by developing a fair and equitable distribution system for state public school funds and funding school construction projects); fiscal accountability (by establishing a system for the entire…
Code of Federal Regulations, 2010 CFR
2010-07-01
... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Asset Services § 102-74.140 On what basis... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false On what basis does the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-21
... Wind Connection Proposal AGENCY: Bureau of Ocean Energy Management, Department of the Interior. ACTION... Comment. SUMMARY: The purpose of this public notice is to: (1) Describe the Atlantic Wind Connection... proposed project, Atlantic Wind Connection (AWC), would entail the construction and installation of a two...
Supersonic air jets preserve tree roots in underground pipeline installation
Rob Gross; Michelle Julene
2002-01-01
Tree roots are often damaged during construction projects, particularly during trenching operations for pipeline installation. Although mechanical soil excavation using heavy equipment, such as an excavator or backhoe is considered the fastest the most economical method, it damages and destroys tree roots and can lead to unintentional tree loss, poor public relations,...
76 FR 7844 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-11
.... Rassbach 509-522-6290. Amended Notices EIS No. 20100444, Final EIS, BLM, NV, Tonopah Solar Energy Crescent Dunes Solar Energy Project, a 7,680-Acre Right-of-Way (ROW) on Public Lands to Construct a Concentrated Solar Thermal Power Plant Facility, Nye County, NV, Contact: Julie Ann Smith 202-586-7668. Revision to...
The Project Approach: An Appreciation for the Constructivist Theory
ERIC Educational Resources Information Center
Cook, Pamela R.
2006-01-01
The purpose of this study was to explore my appreciation for the "constructivist theory" for which an epistemological stance is expressed as an educational ideology, or referred to as constructivism; essentially to construct one's own knowledge. Six energetic five-year-old boys from an urban public school, located within a mid-western…
Mathematics Reform in a Minority Community: Student Outcomes
ERIC Educational Resources Information Center
Van Haneghan, James P.; Pruet, Susan A.; Bamberger, Honi J.
2004-01-01
This article reports on 3 years of mathematics reform that took place in 4 high-poverty minority schools in a large, demographically mixed public school system in the South. Comparisons were made with 2 demographically similar sets of schools on project-constructed interviews, items taken from the Third International Math/Science Study (TIMSS)…
People's perception on impacts of hydro-power projects in Bhagirathi river valley, India.
Negi, G C S; Punetha, Disha
2017-04-01
The people's perception on environmental and socio-economic impacts due to three hydro-electric projects (HEPs; commissioned and under construction) were studied in the north-west Indian Himalaya. Surveys among 140 project-affected people (PAPs) using a checklist of impacts indicate that among the negative impacts, decrease in flora/fauna, agriculture, flow of river, aesthetic beauty; and increase in water pollution, river bed quarrying for sand/stone, human settlement on river banks and social evils; and among the positive impacts, increase in standard of living, road connectivity, means of transport, public amenities, tourism and environmental awareness were related with HEPs. The PAPs tend to forget the negative impacts with the age of the HEPs after it becomes functional, and the positive impacts seem to outweigh the negative impacts. Study concludes that it is difficult to separate the compounding impacts due to HEP construction and other anthropogenic and natural factors, and in the absence of cause-and-effect analyses, it is hard to dispel the prevailing notion that HEPs are undesirable in the study area that led to agitations by the environmentalists and stopped construction of one of these HEPs. To overcome the situation, multi-disciplinary scientific studies involving the PAPs need to be carried out in planning and decision-making to make HEPs environment friendly and sustainable in this region. There is also a need to adopt low carbon electric power technologies and promote a decentralized energy strategy through joint ventures between public and private companies utilizing locally available renewable energy resources.
Green Open Space: Awareness for Health or Sustainability?
NASA Astrophysics Data System (ADS)
Dewi, O. C.; Chairunnisa, I.; Hidayat, T.; Anggraini, M.; Napitupulu, A.
2018-03-01
Universitas Indonesia in cooperation with American Red Cross and Indonesian Red Cross have been assisting green open space revitalisation program in 7 locations in Bogor Regency (2016-2017). The program was held under The Urban Disaster Risk Reduction Greater Jakarta Project; an initiative program from American Red Cross Indonesia. This project was not only improving the existing green open space quality, but also creating one adapted from public land. The revitalization project figures what happened on daily basis on the existing land, proposing new programming facilities, community-based construction, monitoring and handing over. This paper discovers the meaning of a green space for the community, whether the community aware of its benefit on human health or environmental sustainability. The research question is does the community aware of green open space benefit for human health or environmental sustainability? Or both? The original data from the community was gathered and grouped based on its relevance with environmental quality and public health.
NASA Astrophysics Data System (ADS)
Vicari, Rosa; Tchiguirinskaia, Ioulia; Schertzer, Daniel
2017-04-01
Adverse social impacts can reduce the intended benefits of a project aimed to reduce flood risks, and can threaten its viability if they are severe enough. In some other cases, the diverse impacts may mutually counter-balance each other, by furthermore strengthening and amplifying the social resilience. Social changes include those associated with the phenomenon known as the social construction of reality. In the case of proposed actions that involve controversy, attitudes and perceptions toward a proposed policy change are one of the variables that must be considered in determining the significance of impacts. This research entails an analysis of public authorities strategic documents developed during the last ten years in the context of strengthening Paris flood resilience. The review highlights a clear trend to encourage citizen participation and to share responsibilities with the population. This trend does not only express a political will to apply the principle of subsidiarity and decentralise risk management, it also springs from a growing awareness among public institutions of the impact that social construction of the reality can have. Hence the communication between local governments and citizens, especially a two-ways dialogue (i.e. participatory communication), has become a keystone of resilience strategies since it facilitates mutual understanding, shared goals identification and cooperation. More and more frequently flood resilience projects entail a communication strategy or focus on communication actions. However not all these project identify clear communication objectives, target audiences or monitor communication impact. Measuring communication indicators allows decision makers to compare the costs of communication actions with the economic, environmental, social, and sanitary costs of non-action. Those metrics also help to set up clear communication objectives at the beginning of a project, to evaluate and improve management capacities, to increase transparency and stakeholder involvement during and after a project. This research is being undertaken in partnership with Veolia.
The Lesotho Hospital PPP experience: catalyst for integrated service delivery.
Coelho, Carla Faustino; O'Farrell, Catherine Commander
2011-01-01
For many years, Lesotho urgently needed to replace its main public hospital, Queen Elizabeth II. The project was initially conceived as a single replacement hospital, but eventually included the design and construction of a new 425 bed public hospital and adjacent primary care clinic, the renovation and expansion of three strategically located primary care clinics in the region and the management of all facilities, equipment and delivery of all clinical services in the health network by a private operator under contract for 18 years. The project's design was influenced by the recognition that a new facility alone would not address the underlying issues in service provision. The creation of this PPP health network and the contracting mechanism has increased accountability for service quality, shifted Government to a more strategic role and may also benefit other public facilities and providers in Lesotho. The county is considering the PPP approach for other health facilities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Starr, D. L.; Wozniak, P. R.; Vestrand, W. T.
2002-01-01
SkyDOT (Sky Database for Objects in Time-Domain) is a Virtual Observatory currently comprised of data from the RAPTOR, ROTSE I, and OGLE I1 survey projects. This makes it a very large time domain database. In addition, the RAPTOR project provides SkyDOT with real-time variability data as well as stereoscopic information. With its web interface, we believe SkyDOT will be a very useful tool for both astronomers, and the public. Our main task has been to construct an efficient relational database containing all existing data, while handling a real-time inflow of data. We also provide a useful web interface allowing easymore » access to both astronomers and the public. Initially, this server will allow common searches, specific queries, and access to light curves. In the future we will include machine learning classification tools and access to spectral information.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ross, W.A.
1994-07-01
The environmental impact statement (EIS) system of the Philippines is reviewed, identifying progress made in its effective implementation since 1986. Improvement in coverage is noted and real commitment to good environmental impact assessment (EIA) practice is found in those responsible for the EIS system. Project proponents show a modest acceptance of the system. Major problems remaining are: (1) the EIS system is seen as a bureaucratic requirement needed to obtain project approvals; (2) political interference determines the outcome of some environmental reviews; (3) questionable practices by public servants serve to discredit the system; and (4) the treatment of projects inmore » environmentally critical areas is less than satisfactory. Based on the principle that it is essential to establish a credible process seen to work effectively by the public, politicians, the government bureaucracy, and proponents, suggestions for improvement are made. They deal with the treatment of EISs for projects already under construction, EIA training courses, and simple adjustments to the EIS system to focus it on the most important projects.« less
[Privacy and public benefit in using large scale health databases].
Yamamoto, Ryuichi
2014-01-01
In Japan, large scale heath databases were constructed in a few years, such as National Claim insurance and health checkup database (NDB) and Japanese Sentinel project. But there are some legal issues for making adequate balance between privacy and public benefit by using such databases. NDB is carried based on the act for elderly person's health care but in this act, nothing is mentioned for using this database for general public benefit. Therefore researchers who use this database are forced to pay much concern about anonymization and information security that may disturb the research work itself. Japanese Sentinel project is a national project to detecting drug adverse reaction using large scale distributed clinical databases of large hospitals. Although patients give the future consent for general such purpose for public good, it is still under discussion using insufficiently anonymized data. Generally speaking, researchers of study for public benefit will not infringe patient's privacy, but vague and complex requirements of legislation about personal data protection may disturb the researches. Medical science does not progress without using clinical information, therefore the adequate legislation that is simple and clear for both researchers and patients is strongly required. In Japan, the specific act for balancing privacy and public benefit is now under discussion. The author recommended the researchers including the field of pharmacology should pay attention to, participate in the discussion of, and make suggestion to such act or regulations.
Potential difficulties in applying the Pay for Safety Scheme (PFSS) in construction projects.
Choi, Tracy N Y; Chan, Daniel W M; Chan, Albert P C
2012-09-01
Since 1996, the Government of the Hong Kong Special Administrative Region (HKSAR) has introduced the Pay for Safety Scheme (PFSS) to the public works construction contracts to uplift their safety performance. However, the adoption of PFSS has also encountered some difficulties that merit considerable attention. This paper purports to provide a concise review of the prevailing application of PFSS in Hong Kong in general, and to explore the potential difficulties associated with PFSS in particular. By means of an empirical questionnaire survey geared towards industrial practitioners with extensive direct hands-on PFSS experience, their opinions were solicited, analyzed and compared between the client group and contractor group of respondents. The three most significant difficulties in implementing PFSS were found to be: (1) "Plenty of paperwork required for certifying payment to contractor"; (2) "Complicated contract documents and lengthy assessment process"; and (3) "Over-tight project schedule requiring rush jobs". The output of this research study is particularly essential in assisting the contracting parties to mitigate the avoidable hindrances when embarking on PFSS. It has also generated valuable insights into developing effective recommendations for alleviating the barriers to PFSS success for future construction projects. Copyright © 2011 Elsevier Ltd. All rights reserved.
Social amplification of risk in the Internet environment.
Chung, Ik Jae
2011-12-01
This article analyzes the dynamic process of risk amplification in the Internet environment with special emphasis on public concern for environmental risks from a high-speed railway tunnel construction project in South Korea. Environmental organizations and activists serving as social stations collected information about the project and its ecological impact, and communicated this with the general public, social groups, and institutions. The Internet provides social stations and the public with an efficient means for interactive communication and an open space for active information sharing and public participation. For example, while the website of an organization such as an environmental activist group can initially trigger local interest, the Internet allows this information to be disseminated to a much wider audience in a manner unavailable to the traditional media. Interaction among social stations demonstrates an amplifying process of public attention to the risk. Analyses of the volume of readers' comments to online newspaper articles and public opinions posted on message board of public and nonprofit organizations show the ripple effects of the amplification process as measured along temporal, geographical, and sectoral dimensions. Public attention is also influenced by the symbolic connotations of risk information. Interpretations of risk in religious, political, or legal terms intensify public concern for the environmental risk. © 2011 Society for Risk Analysis.
Hahn, Daniel
2010-07-01
In an age of political turmoil and mistrust of governments, having an outlet for creative problem solving that involves all aspects of communities during disasters is critical. Additionally, there is a need for outlets that save taxpayer money for particular projects, such as road construction or infrastructure protection. Public-private partnerships are one way to accomplish these goals. Utilised correctly, a public-private partnership is a win-win situation for all participants. This paper will make the case for the continued support from all sectors for public-private partnerships. A description of public-private partnerships will be given to show the broad spectrum of opportunities for such a partnership. In addition, a case study of a public-private partnership called SAFER Santa Rosa is explored as the programme is oriented towards disasters, but keeps the community engaged all year round. Finally, an example is presented of an initiative that not only exemplifies the spirit of public-private partnerships, but has attracted international recognition because it is simple, replicable, cost-effective and valuable to both the private sector and the public sector. The Business Emergency Response Toolkit bag is a true public-private success story. It is hoped that the reader will be able to replicate the ideas discussed herein in their own community.
Implementation of the Brazilian National Repository - RBMN Project - 13008
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cassia Oliveira de Tello, Cledola
2013-07-01
Ionizing radiation in Brazil is used in electricity generation, medicine, industry, agriculture and for research and development purposes. All these activities can generate radioactive waste. At this point, in Brazil, the use of nuclear energy and radioisotopes justifies the construction of a national repository for radioactive wastes of low and intermediate-level. According to Federal Law No. 10308, Brazilian National Commission for Nuclear Energy (CNEN) is responsible for designing and constructing the intermediate and final storages for radioactive wastes. Additionally, a restriction on the construction of Angra 3 is that the repository is under construction until its operation start, attaining somemore » requirements of the Brazilian Environmental Regulator (IBAMA). Besides this NPP, in the National Energy Program is previewed the installation of four more plants, by 2030. In November 2008, CNEN launched the Project RBMN (Repository for Low and Intermediate-Level Radioactive Wastes), which aims at the implantation of a National Repository for disposal of low and intermediate-level of radiation wastes. This Project has some aspects that are unique in the Brazilian context, especially referring to the time between its construction and the end of its institutional period. This time is about 360 years, when the area will be released for unrestricted uses. It means that the Repository must be safe and secure for more than three hundred years, which is longer than half of the whole of Brazilian history. This aspect is very new for the Brazilian people, bringing a new dimension to public acceptance. Another point is this will be the first repository in South America, bringing a real challenge for the continent. The current status of the Project is summarized. (authors)« less
National Ignition Facility Construction Safety Management Review
DOE Office of Scientific and Technical Information (OSTI.GOV)
Warner, B.E.
2000-02-01
An accident occurred at the NIF construction site on January 13, 2000, in which a worker sustained a serious injury when a 42-inch-diameter duct fell during installation. Following the accident, NIF Project Management chartered two review teams: (1) an Incident Analysis Team to independently assess the direct and root causes of the accident, and (2) a Management Review Team to review the roles and responsibilities of the line, support, and construction management organizations involved. This report provides a discussion of the information gathered by the Management Review Team and provides a list of observations and recommendations based on an analysismore » of the information. The Management Review Team includes senior managers who represent several Directorates within LLNL and DOE OAK: Dick Billia representing Engineering; Dave Leary representing Business Services and Public Affairs; Jim Jackson representing Hazards Control; Chuck Taylor representing DOE OAK; Arnie Clobes representing the ICF/NIF Program; and Jon Yatabe and Bruce Warner (Chairperson) representing the NIF Project. The attached letter from the NIF Project Manager, Ed Moses, to the Management Review Team contains the team's Charter. The team was asked to evaluate the effectiveness of the line management and its supporting safety functions in managing safety during NIF construction. The evaluation was to include the current conventional facility construction, which is 85% complete, and upcoming activities such as Beampath Infrastructure System installation, which will begin in the next six months and which represents a significant amount of work over the next two to three years. The remainder of this document describes the Management Review Team's review process (Section 2), its observations gathered during the review (Section 3), and its recommendations to the NIF Project Manager based on those observations (Section 4).« less
Kenneth J. Kunert
1992-01-01
Significant improvements can be achieved with a minimal amount of funding. The holistic approach used by the Los Padres National Forest to improve the opportunities of persons with disabilities is described. Participation by management and employees in a diverse program of attitudinal training, employment practices, public service, and construction projects has been...
1982-05-01
Thomas P. Kuchar 9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT. PROJECT, TASK Stddent,HDQA, MILPERCEN (DAPC-OPP-E) AREA 6 WORK UNIT...of Financing ................................... 50 Business Practice Information Interchange .................. 50 Program Description...51 Other Types of Credit Exchange Programs .................... 52 Chapter Summary ............................................ 53 IV REM-EDY OPTIONS
A State of Health? Constructive Dialogue and the Rhythms of International Youth Theatre
ERIC Educational Resources Information Center
Parry, Simon
2014-01-01
This article examines youth theatre as a mode of promoting public dialogue within situations of political tension or conflict. It reflects on the author's own experience of trying unsuccessfully to find a framework to evaluate an European Union supported theatre project, youth/art/peace/network, which took place in Austria, Israel and Palestine in…
ERIC Educational Resources Information Center
Olawumi, Timothy Oluwatosin; Ayegun, Olaleke Amos
2016-01-01
The role of the quantity surveyor is one that is often unclear amongst the general public. This study discussed the competencies of the quantity surveyor in measuring and managing civil engineering works and also carrying out the financial management for civil engineering construction projects; also outlined the various competencies and skills…
Using the Sociology of Associations to Rethink STEM Education
ERIC Educational Resources Information Center
Buxton, Cory; Harper, Susan; Payne, Yolanda Denise; Allexsaht-Snider, Martha
2017-01-01
Using three constructs taken from Latour's 2005 book, "Reassembling the Social," we consider our work in 2 contexts that were part of a project to support science teachers working with English learners: an 8th-grade physical science class in a summer science enrichment academy, and a 6th-grade Earth science class in a public middle…
Return Trajectory of the SpaceShipTwo Spacecraft--Numerical Solution
ERIC Educational Resources Information Center
Slegr, J.; Kraus, I.
2012-01-01
SpaceShipTwo is a private spaceplane project which is intended for space tourism. Very few details about its construction and flight characteristics are available for the public, but with proper numerical methods some interesting results can be obtained using secondary school mathematics. An exercise about SpaceShipTwo can be used as a…
Report #13-P-0308, July 2, 2013.In 2007, prior to providing funding to the FBIC DWTP project, the EPA contracted with Rural and Tribal Environmental Solutions to provide plan and specification reviews for public water system construction in Indian Country.
Ohm's Law and Solar Energy. Courseware Evaluation for Vocational and Technical Education.
ERIC Educational Resources Information Center
Gates, Earl; And Others
This courseware evaluation rates the Ohm's Law and Solar Energy program developed by the Iowa Department of Public Instruction. (The program--not contained in this document--covers Ohm's law and resistance problems, passive solar energy, and project ideas and sources.) Part A describes the program in terms of subject area (construction and…
Old Elite Schools, History and the Construction of a New Imaginary
ERIC Educational Resources Information Center
Rizvi, Fazal
2014-01-01
Elite schools established in the nineteenth century in the image of British public schools now face intense competition from newly established elite schools. Located within the broader research project that this special issue discusses, this paper examines some of the ways in which an old elite school in India has sought to utilise is history to…
ERIC Educational Resources Information Center
Garzón, Edgar Augusto Aguirre
2018-01-01
This paper describes a case study research project carried out in a public school in Bogotá, Colombia, with four unlicensed teachers of English as a foreign language. Although the institutional guidelines in the school suggest that teachers should collectively propose changes to shape pedagogical realities, there is evidence of little…
A Guide to Federal Financial Aid for Dental Health: Services, Facilities, Training, and Research.
ERIC Educational Resources Information Center
National Institutes of Health (DHEW), Bethesda, MD. Div. of Dental Health.
Federal financial aid is available for a wide range of dental activities, including the provision of services, construction of facilities, education and training of professional and auxiliary personnel, and the conduct of research and demonstration projects. This publication contains a brief description of the purpose of each federal aid program,…
NASA Astrophysics Data System (ADS)
Vaytens, Andrey; Rusanov, Gennadiy; Skryabin, Pavel
2018-03-01
One of the most important issues in national urban planning is arrangement of high-rise buildings in the largest cities of Russia. This issue becomes especially acute in such cities as Saint Petersburg, which has unique architectural and urban-planning heritage preserved to a great extent. In this regard, it seems important to trace the evolution of high-rise construction development and arrangement in Leningrad - Saint Petersburg in the middle of the 20th — early 21st centuries. The goal of the article is to consider high-rise construction development regarding both public and residential buildings in comparison of project ideas and results of their implementation in the 1940s-2000s. Prerequisites and issues of high-rise construction of that period are considered. Particular attention is paid to changes in the official urban-planning policy, regulatory framework and attitude of city authorities to high-rise construction. The study was carried out with the consideration of the following historic periods differing in their urban-planning policy: the late 1940s-1950s; 1960s; 1970-1980s; 1990s; 2000s-2010s. Economical prerequisites of high-rise construction and their influence on the modern urban-planning policy during the post-Soviet period are considered. In conclusion, an attempt is made to determine tendencies of high-rise construction development in Saint Petersburg.
Research on Bidding Decision-making of International Public-Private Partnership Projects
NASA Astrophysics Data System (ADS)
Hu, Zhen Yu; Zhang, Shui Bo; Liu, Xin Yan
2018-06-01
In order to select the optimal quasi-bidding project for an investment enterprise, a bidding decision-making model for international PPP projects was established in this paper. Firstly, the literature frequency statistics method was adopted to screen out the bidding decision-making indexes, and accordingly the bidding decision-making index system for international PPP projects was constructed. Then, the group decision-making characteristic root method, the entropy weight method, and the optimization model based on least square method were used to set the decision-making index weights. The optimal quasi-bidding project was thus determined by calculating the consistent effect measure of each decision-making index value and the comprehensive effect measure of each quasi-bidding project. Finally, the bidding decision-making model for international PPP projects was further illustrated by a hypothetical case. This model can effectively serve as a theoretical foundation and technical support for the bidding decision-making of international PPP projects.
Programming of Urban Revitalization
NASA Astrophysics Data System (ADS)
Biliński, Tadeusz
2016-12-01
The planning stage of the investment-construction process is of a crucial importance. Its overall impact on the costs, construction time and the quality of design solutions is huge. However, in practice, little attention is given to this pre-design stage, except for public buildings or other buildings of particular importance. In consequence, the results of investment and construction activities are unsatisfactory. Therefore, the issue has been given careful consideration in this paper. The paper discusses the issue of programming urban revitalization, emphasizing its socio-economic importance. To illustrate the complexity of revitalization projects planning, the author draws attention to social, economic, technical and organisational factors, such as public participation, reorganization and revaluation of land use planning, rationalization of energy use, organization and management of revitalization processes, as well as technical progress. Summarising the paper, the author concludes that in order to improve the quality of life of town residents and to protect material national heritage, it is indispensable to continuously revitalize subsequent town areas.
Optimal Contractor Selection in Construction Industry: The Fuzzy Way
NASA Astrophysics Data System (ADS)
Krishna Rao, M. V.; Kumar, V. S. S.; Rathish Kumar, P.
2018-02-01
A purely price-based approach to contractor selection has been identified as the root cause for many serious project delivery problems. Therefore, the capability of the contractor to execute the project should be evaluated using a multiple set of selection criteria including reputation, past performance, performance potential, financial soundness and other project specific criteria. An industry-wide questionnaire survey was conducted with the objective of identifying the important criteria for adoption in the selection process. In this work, a fuzzy set based model was developed for contractor prequalification/evaluation, by using effective criteria obtained from the percept of construction professionals, taking subjective judgments of decision makers also into consideration. A case study consisting of four alternatives (contractors in the present case) solicited from a public works department of Pondicherry in India, is used to illustrate the effectiveness of the proposed approach. The final selection of contractor is made based on the integrated score or Overall Evaluation Score of the decision alternative in prequalification as well as bid evaluation stages.
1990-06-01
restaurants, and other amenities. Although the food and beverage facilities at the National Medical Center are ample, they are not targeted for the...against including a club and restaurant in the BOQ project. Current on-base food and beverage facilities are sufficient to serve the additional demand that...taxing its capacity. In fact, tlie base has six food and beverage facilities that provide a variety of choices, and adding a seventh in the BOQ would
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
The purpose of this inventory of power plants is to provide a ready reference for planners whose focus is on the state, standard Federal region, and/or national level. Thus the inventory is compiled alphabetically by state within standard Federal regions. The units are listed alphabetically within electric utility systems which in turn are listed alphabetically within states. The locations are identified to county level according to the Federal Information Processing Standards Publication Counties and County Equivalents of the States of the United States. Data compiled include existing and projected electrical generation units, jointly owned units, and projected construction units.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lerer, L.B.; Scudder, T.
1999-03-01
Large dams have been criticized because of their negative environmental and social impacts. Public health interest largely has focused on vector-borne diseases, such as schistosomiasis, associated with reservoirs and irrigation projects. Large dams also influence health through changes in water and food security, increases in communicable diseases, and the social disruption caused by construction and involuntary resettlement. Communities living in close proximity to large dams often do not benefit from water transfer and electricity generation revenues. A comprehensive health component is required in environmental and social impact assessments for large dam projects.
Wells, Stewart; Bullen, Chris
2008-01-01
This article describes the near failure of an information technology (IT) system designed to support a government-funded, primary care-based hepatitis B screening program in New Zealand. Qualitative methods were used to collect data and construct an explanatory model. Multiple incorrect assumptions were made about participants, primary care workflows and IT capacity, software vendor user knowledge, and the health IT infrastructure. Political factors delayed system development and it was implemented untested, almost failing. An intensive rescue strategy included system modifications, relaxation of data validity rules, close engagement with software vendors, and provision of intensive on-site user support. This case study demonstrates that consideration of the social, political, technological, and health care contexts is important for successful implementation of public health informatics projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gordon, A.; Lubliner, M.; Howard, L.
2014-04-01
This project analyzes the cost effectiveness of energy savings measures installed by a large public housing authority in Salishan, a community in Tacoma Washington. Research focuses on the modeled and measured energy usage of the first six phases of construction, and compares the energy usage of those phases to phase 7. Market-ready energy solutions were also evaluated to improve the efficiency of affordable housing for new and existing (built since 2001) affordable housing in the marine climate of Washington State.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2014-03-01
This project analyzes the cost effectiveness of energy savings measures installed by a large public housing authority in Salishan, a community in Tacoma Washington. Research focuses on the modeled and measured energy usage of the first six phases of construction, and compares the energy usage of those phases to phase 7. Market-ready energy solutions were also evaluated to improve the efficiency of affordable housing for new and existing (built since 2001) affordable housing in the marine climate of Washington State.
The 3D Elevation Program and America's infrastructure
Lukas, Vicki; Carswell, Jr., William J.
2016-11-07
Infrastructure—the physical framework of transportation, energy, communications, water supply, and other systems—and construction management—the overall planning, coordination, and control of a project from beginning to end—are critical to the Nation’s prosperity. The American Society of Civil Engineers has warned that, despite the importance of the Nation’s infrastructure, it is in fair to poor condition and needs sizable and urgent investments to maintain and modernize it, and to ensure that it is sustainable and resilient. Three-dimensional (3D) light detection and ranging (lidar) elevation data provide valuable productivity, safety, and cost-saving benefits to infrastructure improvement projects and associated construction management. By providing data to users, the 3D Elevation Program (3DEP) of the U.S. Geological Survey reduces users’ costs and risks and allows them to concentrate on their mission objectives. 3DEP includes (1) data acquisition partnerships that leverage funding, (2) contracts with experienced private mapping firms, (3) technical expertise, lidar data standards, and specifications, and (4) most important, public access to high-quality 3D elevation data. The size and breadth of improvements for the Nation’s infrastructure and construction management needs call for an efficient, systematic approach to acquiring foundational 3D elevation data. The 3DEP approach to national data coverage will yield large cost savings over individual project-by-project acquisitions and will ensure that data are accessible for other critical applications.
NASA Astrophysics Data System (ADS)
Saounatsou, Chara; Georgi, Julia
2014-08-01
The Polyphyto Hydroelectric Project was constructed in 1974 and it has been operating since on the Aliakmonas River, Kozani prefecture, by the Greek Public Power Corporation. The construction of the Ilarion Hydroelectric Project, upstream from the Polyphyto Reservoir, has been recently completed and will start operating in the near future. Apart from hydroelectric power production, the Polyphyto reservoir provides flood control to the areas below the Polyphyto dam. It is also used to manage water provision to the city of Thessaloniki and adjacent agricultural plain, providing at the same time cooling water to the Thermo Electric Projects in Ptolemaida. The Polyphyto reservoir has potential for further development as an economic fulcrum to the region in which is located. The Kozani and Servia-Velvendos Municipalities have proceeded to the construction of several touristic, nautical - athletic and fishing projects. In order to promote such developments, while preserving the artificial wetland, flora and fauna of the Polyphyto Reservoir, it is important to reduce the fluctuation of the reservoir elevation which according to its technical characteristics is 21m. The aim of this paper is to propose the combined operation of the two Hydroelectric Project reservoirs to satisfy all the present Polyphyto Hydroelectric Project functions and to reduce the annual fluctuation of the Polyphyto Reservoir. The HEC-5, Version 8 / 1998 computer model was used in our calculations, as developed by the Hydrologic Engineering Center (HEC) of the US Army Corps of Engineers for reservoir operation simulation. Five possible operation scenarios are tested in this paper to show that the present fluctuation of the Polyphyto Reservoir can be reduced, with some limitations, except during dry weather periods.
Using Green Building As A Model For Making Health Promotion Standard In The Built Environment.
Trowbridge, Matthew J; Worden, Kelly; Pyke, Christopher
2016-11-01
The built environment-the constructed physical parts of the places where people live and work-is a powerful determinant of both individual and population health. Awareness of the link between place and health is growing within the public health sector and among built environment decision makers working in design, construction, policy, and both public and private finance. However, these decision makers lack the knowledge, tools, and capacity to ensure that health and well-being are routinely considered across all sectors of the built environment. The green building industry has successfully established environmental sustainability as a normative part of built environment practice, policy making, and investment. We explore the value of this industry's experience as a template for promoting health and well-being in the built environment. Project HOPE—The People-to-People Health Foundation, Inc.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-24
... gold mine and associated processing and ancillary facilities. The project would be located on public... media, newspapers and the BLM Web site at: http://www.blm.gov/nv/st/en/fo/battle_mountain_field.html... to construct, operate, reclaim, and close an open pit, heap leach, gold mining operation known as the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-14
... transmission system. Western is issuing this notice to inform the public and interested parties about Western's... scope, proposed action, alternatives, and issues to be addressed in the EIS. Solar Reserve has applied to the Bureau of Land Management (BLM), Yuma Field Office for a right-of-way grant for the proposed...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Are Self-Governance Tribes required to adopt a...-GOVERNANCE Construction Nepa Process § 137.293 Are Self-Governance Tribes required to adopt a separate... project agreement? No, the Self-Governance Tribe may adopt a single resolution or take equivalent Tribal...
ERIC Educational Resources Information Center
Love, Paula
2012-01-01
The federal government last formally assessed the state of the nation's schools in the 1999 report "Condition of America's Public School," which estimated that it would take $127 billion to bring the nation's schools to "good condition." The American Society of Civil Engineers (ASCE) issued its own report card the same year. In…
Building Schools in a Tight Economy? Do Your Homework
ERIC Educational Resources Information Center
Watts, Chris
2009-01-01
With unemployment rising and the public more concerned about the economy than at any other time in recent memory, the idea of a municipality deciding to spend millions of dollars to build or refurbish a school seems an uphill challenge to say the least. In the best of times, voter approval for school construction projects is difficult to get;…
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What happens if the Self-Governance Tribe and the... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Project Assumption Process § 137.330 What happens if the Self-Governance Tribe and the Secretary cannot develop a mutually agreeable...
ERIC Educational Resources Information Center
Human Rights in China, New York, NY.
This report, based on official Chinese publications and interviews, examines the barriers official policies present to the realization of the right to education for migrant children in China, at a time when Beijing and other cities are employing large numbers of migrants in urban construction projects in preparation for the 2008 Olympic Games. The…
Cheng, Ching-Wu; Leu, Sou-Sen; Cheng, Ying-Mei; Wu, Tsung-Chih; Lin, Chen-Chung
2012-09-01
Construction accident research involves the systematic sorting, classification, and encoding of comprehensive databases of injuries and fatalities. The present study explores the causes and distribution of occupational accidents in the Taiwan construction industry by analyzing such a database using the data mining method known as classification and regression tree (CART). Utilizing a database of 1542 accident cases during the period 2000-2009, the study seeks to establish potential cause-and-effect relationships regarding serious occupational accidents in the industry. The results of this study show that the occurrence rules for falls and collapses in both public and private project construction industries serve as key factors to predict the occurrence of occupational injuries. The results of the study provide a framework for improving the safety practices and training programs that are essential to protecting construction workers from occasional or unexpected accidents. Copyright © 2011 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Mariano, S.; di Toro, G.; Collettini, C.; Usems Team; Glass Team
2011-12-01
USEMS and GLASS are two projects financed by the European Research Council (ERC) as part of the ERC starting grants scheme within the FP7 framework. The rationale behind the funding scheme is to support some of the most promising scientific endeavours in Europe that are being led by young researchers, and to emphasize the excellence of individual ideas rather than specific research areas; in other words, to promote bottom-up frontier research. The general benefits of this rationale are evident in the two ongoing projects that deal with earthquake physics, as these projects are increasingly recognized in their scientific community. We can say that putting excellence at the heart of European Research strongly contributes to the construction of a European knowledge-based society. From a researcher point-of-view one of the most challenging aspects of these projects is to approach and convey the results of the projects to a general public, contributing to the construction of knowledge-based society. Luckily, media interest and the availability of a number of new communication tools facilitate the outreach of scientific achievements. The largest earthquakes during the last ten years (e.g. Sumatra 2004 and Japan 2011) have received widespread attention in the media world (TV, W.W.W., Newspaper and so on) for months, and successful research projects such as those above also become media protagonists, gaining their space in the media bullring. The USEMS principal investigator and his team have participated in several dissemination events in the Mass Media, such as interviews wit Italian and French TV national broadcasts (RAI Due TG2, RAI Uno Unomattina, Rai Tre Geo & Geo, FRANCE 2); interviews in scientific journals: SCIENCE (Sept. 2010), newspapers and web (Corriere della Sera, Il Gazzettino, Il Messagero, La Stampa, Libero, Il Mattino, Yahoo, ANSA, AdnKronos and AGI); radio (RadioRai Uno, RadioRai Tre Scienza); documentary "Die Eroberung der Alpen" produced by Tangram Film (Munchen, Germany). The USEMS project started in June 2008, and the GLASS project in October 2010. For both projects we developed a number of web pages through the official web site of the host institution, the National Institute of Geophysics and Volcanology (INGV) in Rome. In these pages we describe the projects, publish pictures and short-movies of the experimental activities and keep the project results up to date. In addition the research teams collaborate within various INGV outreach schemes (school and student visits in the laboratory, writing short news reports for the INGV press office, and interviews with journalists) as well as using WWW channels (Facebook, Youtube) to make the project results available to the general public. Finally, it is notable that the ERC funding agency itself is fully involved in the outreach activities using its own communication channels and its highly skilled resources which promote through brochures, web pages, publications and documentaries the best projects. We are going to improve our effort in this direction up to the end of the projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
DuVall, G.D.
1994-01-01
At the request of Martin Marietta Energy Systems, Inc., Oak Ridge, Tennessee, an archaeological reconnaissance and evaluation of the Oak Ridge National Laboratory (ORNL) developed areas was conducted between June I and September 2, 1993. The project was conducted by Glyn D. DuVall, Principal Investigator. ORNL project representative, Peter Souza, accompanied the principal investigator during all project evaluations. The reconnaissance to assess adverse impacts to cultural resources located within the boundaries of federally licensed, permitted, funded or assisted projects was conducted in compliance with the National Historic Preservation Act of 1966 (Public Law 89-665; 16 USC 470; 80 Stat. 915),more » National Environmental Policy Act of 1969 (Public Law 91-190; 91 Stat. 852; 42 USC 4321-4347) and Executive Order 11593 (May 13, 1971). Based upon the reconnaissance, a search of the site files at the Tennessee Division of Archaeology and a search of the National Register of Historic Places, the proposed construction on the site will have no impact on any property included in or eligible for inclusion in the National Register of Historic Places pursuant to 36 CFR 60.4. This judgement is based on the amount of prior disturbance associated with ORNL during the past 50 years. Construction in the vicinity of the New Bethel Baptist Church and Cemetery should allow sufficient buffer to avoid direct and visual impact to the property. The determination of sufficient buffer area, either distance or vegetative, should be coordinated with the Tennessee Historical Commission, Office of the State Historic Preservation Officer.« less
Review of Qualitative Approaches for the Construction Industry: Designing a Risk Management Toolbox
Spee, Ton; Gillen, Matt; Lentz, Thomas J.; Garrod, Andrew; Evans, Paul; Swuste, Paul
2011-01-01
Objectives This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Methods Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. Results This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. Conclusion The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions. PMID:22953194
Review of qualitative approaches for the construction industry: designing a risk management toolbox.
Zalk, David M; Spee, Ton; Gillen, Matt; Lentz, Thomas J; Garrod, Andrew; Evans, Paul; Swuste, Paul
2011-06-01
This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions.
Appraising the value of independent EIA follow-up verifiers
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wessels, Jan-Albert, E-mail: janalbert.wessels@nwu.ac.za; Retief, Francois, E-mail: francois.retief@nwu.ac.za; Morrison-Saunders, Angus, E-mail: A.Morrison-Saunders@murdoch.edu.au
Independent Environmental Impact Assessment (EIA) follow-up verifiers such as monitoring agencies, checkers, supervisors and control officers are active on various construction sites across the world. There are, however, differing views on the value that these verifiers add and very limited learning in EIA has been drawn from independent verifiers. This paper aims to appraise how and to what extent independent EIA follow-up verifiers add value in major construction projects in the developing country context of South Africa. A framework for appraising the role of independent verifiers was established and four South African case studies were examined through a mixture ofmore » site visits, project document analysis, and interviews. Appraisal results were documented in the performance areas of: planning, doing, checking, acting, public participating and integration with other programs. The results indicate that independent verifiers add most value to major construction projects when involved with screening EIA requirements of new projects, allocation of financial and human resources, checking legal compliance, influencing implementation, reporting conformance results, community and stakeholder engagement, integration with self-responsibility programs such as environmental management systems (EMS), and controlling records. It was apparent that verifiers could be more creatively utilized in pre-construction preparation, providing feedback of knowledge into assessment of new projects, giving input to the planning and design phase of projects, and performance evaluation. The study confirms the benefits of proponent and regulator follow-up, specifically in having independent verifiers that disclose information, facilitate discussion among stakeholders, are adaptable and proactive, aid in the integration of EIA with other programs, and instill trust in EIA enforcement by conformance evaluation. Overall, the study provides insight on how to harness the learning opportunities arising from EIA follow-up through the appointment of independent verifiers. - Highlights: • A framework for appraising the role of independent verifiers is established. • The value added to EIA follow-up by independent verifiers in South Africa is documented. • Verifiers add most value when involved with screening, checking compliance, influencing decisions and community engagement. • Verifiers could be more creatively utilized in pre-construction preparation, giving feedback, and performance evaluation.« less
Dams and Intergovernmental Transfers
NASA Astrophysics Data System (ADS)
Bao, X.
2012-12-01
Gainers and Losers are always associated with large scale hydrological infrastructure construction, such as dams, canals and water treatment facilities. Since most of these projects are public services and public goods, Some of these uneven impacts cannot fully be solved by markets. This paper tried to explore whether the governments are paying any effort to balance the uneven distributional impacts caused by dam construction or not. It showed that dam construction brought an average 2% decrease in per capita tax revenue in the upstream counties, a 30% increase in the dam-location counties and an insignificant increase in downstream counties. Similar distributional impacts were observed for other outcome variables. like rural income and agricultural crop yields, though the impacts differ across different crops. The paper also found some balancing efforts from inter-governmental transfers to reduce the unevenly distributed impacts caused by dam construction. However, overall the inter-governmental fiscal transfer efforts were not large enough to fully correct those uneven distributions, reflected from a 2% decrease of per capita GDP in upstream counties and increase of per capita GDP in local and downstream counties. This paper may shed some lights on the governmental considerations in the decision making process for large hydrological infrastructures.
The Planeterrella experiment: from individual initiative to networking
NASA Astrophysics Data System (ADS)
Lilensten, Jean; Provan, Gabrielle; Grimald, Sandrine; Brekke, Asgeir; Flückiger, Erwin; Vanlommel, Petra; Wedlund, Cyril Simon; Barthélémy, Mathieu; Garnier, Pierre
2013-02-01
Space weather is a relatively new discipline, which is still largely unknown amongst the wider public despite its increasing importance in all of our daily lives. Outreach activities can promote awareness of space weather. In particular the visual beauty and excitement of the aurora make these lights a wonderful inspirational hook to enhance understanding of space weather in a general audience. A century ago, the Norwegian experimental physicist Kristian Birkeland, one of the founding fathers of modern space science, demonstrated with his Terrella experiment the formation of the aurora. Recently, a modernized version of the Terrella has been designed. This "Planeterrella" experiment allows the visualization of many phenomena that occur in our space environment. Although the Planeterrella was originally a local project, it has developed to become a very successful international public outreach experiment. We believe that its success is due to mainly two factors (i) the Planeterrella is not patented and the plans are free to any public institute and (ii) the project is widely advertised using national and European scientific networks such as COST ES 0803, as well as press releases, books and web sites. Today, seven Planeterrellas are in operation, four more are under construction in four different countries and several more are being planned. During the last five years, about 50 000 people in Europe have attended live Planeterrella demonstration on the formation of auroral light, the space environment and space weather. Many more have seen the Planeterrella being demonstrated on TV. The Planeterrella received the first international prize for outreach activities from the Europlanet Framework 7 program in 2010 and the French Ministry of Science outreach prize "Le goût des sciences" in November 2012. This paper describes the process that led to the construction of the first Planeterrella and discusses how the Planeterrella project developed to become an international public outreach phenomenon. We also examine some of the lessons learnt along the way.
2003-08-27
KENNEDY SPACE CENTER, FLA. - Daniel L. Tweed, with the Facilities Division, NASA Spaceport Services, addresses attendees at the ribbon cutting for the KSC Security gates. Tweed was project manager. The two new Security gates on Kennedy Parkway (Gate 2) and NASA Parkway (Gate 3) were activated Aug. 1, allowing the general public to have access to the new Space Commerce Way, which will provide access to the Research Park and KSC Visitor Complex, and providing an alternate route for the general public between Titusville and Merritt Island that is accessible 24 hours a day. The gates are staffed 24 hours daily. Others taking part in the ribbon cutting were Center Director Jim Kennedy; Chief, Protective & Safe Guards Office, Calvin L. Burch; SGS Deputy Program Manager William A. Sample; and Bobby Porter, with Oneida Construction.
FULL SCALE BIOREACTOR LANDFILL FOR CARBON SEQUESTRATION AND GREENHOUSE EMISSION CONTROL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ramin Yazdani; Jeff Kieffer; Heather Akau
2003-08-01
The Yolo County Department of Planning and Public Works is constructing a full-scale bioreactor landfill as a part of the Environmental Protection Agency's (EPA) Project XL program to develop innovative approaches for carbon sequestration and greenhouse emission control. The overall objective is to manage landfill solid waste for rapid waste decomposition and maximum landfill gas generation and capture for carbon sequestration and greenhouse emission control. Waste decomposition is accelerated by improving conditions for either the aerobic or anaerobic biological processes and involves circulating controlled quantities of liquid (leachate, groundwater, gray water, etc.), and, in the aerobic process, large volumes ofmore » air. The first phase of the project entails the construction of a 12-acre module that contains a 6-acre anaerobic cell, a 3.5-acre anaerobic cell, and a 2.5-acre aerobic cell at the Yolo County Central Landfill near Davis, California. The cells are highly instrumented to monitor bioreactor performance. Liquid addition has commenced in the 3.5-acre anaerobic cell and the 6-acre anaerobic cell. Construction of the 2.5-acre aerobic cell is nearly complete with only the biofilter remaining and is scheduled to be complete by the end of August 2003. The current project status and preliminary monitoring results are summarized in this report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pardo-Bosch, Francesc, E-mail: francesc.pardo@upc.edu; Political Science Department, University of California - Berkeley; Aguado, Antonio, E-mail: antonio.aguado@upc.edu
Infrastructure construction, one of the biggest driving forces of the economy nowadays, requires a huge analysis and clear transparency to decide what projects have to be executed with the few resources available. With the aim to provide the public administrations a tool with which they can make their decisions easier, the Sustainability Index of Infrastructure Projects (SIIP) has been defined, with a multi-criteria decision system called MIVES, in order to classify non-uniform investments. This index evaluates, in two inseparable stages, the contribution to the sustainable development of each infrastructure project, analyzing its social, environmental and economic impact. The result ofmore » the SIIP allows to decide the order with which projects will be prioritized. The case of study developed proves the adaptability and utility of this tool for the ordinary budget management.« less
Commercial Buildings Partnerships - Overview of Higher education projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Parrish, Kristen; Robinson, Alastair; Regnier, Cindy
2013-02-01
The Commercial Building Partnership (CBP), a public/private, cost-shared program sponsored by the U.S. Department of Energy (DOE), paired selected commercial building owners and operators with representatives of DOE, its national laboratories, and private-sector technical experts. These teams explored energy-saving measures across building systems – including some considered too costly or technologically challenging – and used advanced energy modeling to achieve peak whole-building performance. Modeling results were then included in new construction or retrofit designs to achieve significant energy reductions. CBP design goals aimed to achieve 50 percent energy savings compared to ANSI/ASHRAE/IES Standard 90.1-2004 for new construction, while retrofits aremore » designed to consume at least 30 percent less energy than either Standard 90.1-2004 or current consumption. After construction and commissioning of the project, laboratory staff continued to work with partners to collect and analyze data for verification of the actual energy reduction. CBP projects represent diverse building types in commercial real estate, including lodging, grocery, retail, higher education, office, and warehouse/storage facilities. Partners also commit to replicating low-energy technologies and strategies from their CBP projects throughout their building portfolios. As a result of CBP projects, five sector overviews (Lodging, Food Sales, General Merchandise, Higher Education, Offices) were created to capture successful strategies and recommended energy efficiency measures that could broadly be applied across these sectors. These overviews are supplemented with individual case studies providing specific details on the decision criteria, modeling results, and lessons learned on specific projects. Sector overviews and CBP case studies will also be updated to reflect verified data and replication strategies as they become available.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim
2013-07-01
The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Projectmore » includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)« less
NASA Astrophysics Data System (ADS)
Latief, Yusuf; Machfudiyanto, Rossy A.; Arifuddin, Rosmariani; Yogiswara, Yoko
2017-03-01
Based on the data, 32% of accidental cases in Indonesia occurs on constructional sectors. It is supported by the data from Public Work and Housing Department that 27.43% of the implementation level of Safety Management System policy at construction companies in Indonesia remains unsafe categories. Moreover, there are dimensions of occupational safety culture formed including leadership, behavior, strategy, policy, process, people, safety cost, value and contract system. The aim of this study is to determine the model of an effective safety culture and know the relationship between dimensions in construction industry. The method used in this research was questionnaire survey which was distributed to the sample of construction companies either in a national private one in Indonesia. The result of this research is supposed to be able to illustrate the development of the relationship among occupational safety culture dimensions which have influences to the performances of constructional companies in Indonesia.
Hinckson, Erica; Schneider, Margaret; Winter, Sandra J; Stone, Emily; Puhan, Milo; Stathi, Afroditi; Porter, Michelle M; Gardiner, Paul A; Dos Santos, Daniela Lopes; Wolff, Andrea; King, Abby C
2017-09-29
Physical inactivity across the lifespan remains a public health issue for many developed countries. Inactivity has contributed considerably to the pervasiveness of lifestyle diseases. Government, national and local agencies and organizations have been unable to systematically, and in a coordinated way, translate behavioral research into practice that makes a difference at a population level. One approach for mobilizing multi-level efforts to improve the environment for physical activity is to engage in a process of citizen science. Citizen Science here is defined as a participatory research approach involving members of the public working closely with research investigators to initiate and advance scientific research projects. However, there are no common measures or protocols to guide citizen science research at the local community setting. We describe overarching categories of constructs that can be considered when designing citizen science projects expected to yield multi-level interventions, and provide an example of the citizen science approach to promoting PA. We also recommend potential measures across different levels of impact. Encouraging some consistency in measurement across studies will potentially accelerate the efficiency with which citizen science participatory research provides new insights into and solutions to the behaviorally-based public health issues that drive most of morbidity and mortality. The measures described in this paper abide by four fundamental principles specifically selected for inclusion in citizen science projects: feasibility, accuracy, propriety, and utility. The choice of measures will take into account the potential resources available for outcome and process evaluation. Our intent is to emphasize the importance for all citizen science participatory projects to follow an evidence-based approach and ensure that they incorporate an appropriate assessment protocol. We provided the rationale for and a list of contextual factors along with specific examples of measures to encourage consistency among studies that plan to use a citizen science participatory approach. The potential of this approach to promote health and wellbeing in communities is high and we hope that we have provided the tools needed to optimally promote synergistic gains in knowledge across a range of Citizen Science participatory projects.
Experience with modified aerospace reliability and quality assurance method for wind turbines
NASA Technical Reports Server (NTRS)
Klein, W. E.
1982-01-01
The SR&QA approach assures that the machine is not hazardous to the public or operating personnel, can operate unattended on a utility grid, demonstrates reliability operation, and helps establish the quality assurance and maintainability requirements for future wind turbine projects. The approach consisted of modified failure modes and effects analysis (FMEA) during the design phase, minimal hardware inspection during parts fabrication, and three simple documents to control activities during machine construction and operation. Five years experience shows that this low cost approach works well enough that it should be considered by others for similar projects.
Specifications and Construction Methods for Asphalt Concrete and Other Plant-Mix Types, 3rd Edition.
ERIC Educational Resources Information Center
Asphalt Inst., College Park, MD.
The purpose of this publication is to assist engineers in the analysis, design and control of paving projects that use asphalt concrete and other asphalt plant-mixes. The scope of this new third edition has been enlarged, and changes necessitated by advances in asphalt technology have been incorporated. Chapters I and II and Appendices A and B…
Code of Federal Regulations, 2011 CFR
2011-04-01
... to be reported should represent the project work force on board in all or any part of the last... journey-level men and women, apprentices, and on-the-job trainees. Staffing figures to be reported in... accounted for. This information will be useful in complying with the U.S. Senate Committee on Public Works...
S. Lebow
1996-01-01
Preservative-treated wood is an economical, durable, and aesthetically pleasing building material; therefore, it is a natural choice for construction projects in our National Forests, National Parks, and other public lands. However, we need to ensure that the chemicals used in treated wood do not pose a threat to people or the environment. The purpose of this report is...
ERIC Educational Resources Information Center
Copeland, Kristopher
2013-01-01
Lottery policies have been created by many states to generate additional funds to support public initiatives, such as higher education scholarships. In 2009, Arkansas adopted a lottery to generate higher education scholarships. The purpose of this qualitative case study was to examine the Arkansas state lottery policy design process to better…
1989-09-01
projections of planned construction, overhaul and repair work from both the public and commercial sectors can never sustain the industry at a level which...and other government organizations to support the Shipyard Recovery Plan and the revitalization of commercial shipbuilding in America. Expanding...engineer sitting next to the organization that does work package planning on ships and from the fleet. It won’t be, at least in these competitive firms
Theoretical framework of the causes of construction time and cost overruns
NASA Astrophysics Data System (ADS)
Ullah, K.; Abdullah, A. H.; Nagapan, S.; Suhoo, S.; Khan, M. S.
2017-11-01
Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.
Public Health and Social Ideas in Modern Brazil
Lima, Nísia Trindade
2007-01-01
Public health in Brazil achieved remarkable development at the turn of the 20th century thanks in part to physicians and social thinkers who made it central to their proposals for “modernizing” the country. Public health was more than a set of medical and technical measures; it was fundamental to the project of nation building. I trace the interplay between public health and social ideas in the late 19th and early 20th centuries. Physicians and social thinkers challenged the traditional belief that Brazil’s sociocultural and ethnic diversity was an obstacle to modernization, and they promoted public health as the best prescription for national unity. Public health ideas in developing countries such as Brazil may have a greater impact when they are intertwined with social thought and with the processes of nation building and construction of a modern society. PMID:17538074
Evolution of environmental impact assessment as applied to watershed modification projects in Canada
NASA Astrophysics Data System (ADS)
Dirschl, Herman J.; Novakowski, Nicholas S.; Sadar, M. Husain
1993-07-01
This article reviews the application of environmental impact assessment (EIA) procedures and practices to three watershed modification projects situaled in western Canada. These ventures were justified for accelerating regional economic development, and cover the period during which public concerns for protecting the environment rapidly made their way into the national political agenda. An historical account and analysis of the situation, therefore, seems desirable in order to understand the development of EIA processes, practices, and methodologies since the start of construction of the first project in 1961. This study concludes that there has been good progress in predicting and evaluating environmental and related social impacts of watershed modification proposals. However, a number of obstacles need to be overcome before EIA can firmly establish itself as an effective planning tool. These difficulties include jurisdictional confusions and conflicts, division of authority and responsibility in designing and implementing appropriate mitigative and monitoring measures, lack of tested EIA methodologies, and limited availability of qualified human resources. A number of conclusions and suggestions are offered so that future watershed modification proposals may be planned and implemented in a more environmentally sustainable fashion. These include: (1) EIA processes must be completed before irrevocable decisions are made. (2) Any major intrusion into a watershed is likely to impact on some major components of the ecosystem(s). (3) Mitigation costs must form part of the benefit-cost analysis of any project proposal. (4) Interjurisdictional cooperation is imperative where watersheds cross political boundaries. (5) The EIA process is a public process, hence public concerns must be dealt with fairly. (6) The role of science in the EIA process must be at arms length from project proponents and regulators, and allowed to function in the interest of the protection of the environment and public health and safety.
Kim, Sook-Nam; Choi, Soon-Ock; Shin, Seong Hoon; Ryu, Ji-Sun; Baik, Jeong-Won
2017-07-01
A feasible palliative care model for advance cancer patients is needed in Korea with its rapidly aging population and corresponding increase in cancer prevalence. This study describes the process involved in the development of a community-based palliative care (CBPC) model implemented originally in a Busan pilot project. The model development included steps I and II of the pilot project, identification of the service types, a survey exploring the community demand for palliative care, construction of an operational infrastructure, and the establishment of a service delivery system. Public health centers (including Busan regional cancer centers, palliative care centers, and social welfare centers) served as the regional hubs in the development of a palliative care model. The palliative care project included the provision of palliative care, establishment of a support system for the operations, improvement of personnel capacity, development of an educational and promotional program, and the establishment of an assessment system to improve quality. The operational infrastructure included a service management team, provision teams, and a support team. The Busan Metropolitan City CBPC model was based on the principles of palliative care as well as the characteristics of public health centers that implemented the community health projects. The potential use of the Busan CBPC model in Korea should be explored further through service evaluations.
In it together: Organizational learning through participation in environmental assessment
NASA Astrophysics Data System (ADS)
Fitzpatrick, Patricia
2005-07-01
Can organizations learn through participation in environmental assessment (EA)? This was the central research question of a study that explored the linkages among sustainable development, EA, public participation, and learning. To address this question, the research design involved a comparative case study of two concurrent but geographically separate projects, the Wuskwatim generation station and transmission lines projects (Wuskwatim projects), and the Snap Lake Diamonds Project (Snap Lake project). The Wuskwatim projects involve the construction of a low head dam and three 230 kV transmission line segments in Northern Manitoba, Canada. The Snap Lake Project involves the construction and operation of a diamond mine 220 km northwest of Yellowknife, Northwest Territories, Canada, at the headwaters of the Lockhart River drainage system. The EAs of these proposed developments provided multiple opportunities for public (and organizational) involvement in the review, including comments on the scope of the assessment, information requests, and public hearings. Data collection included participant observation, semi-structured interviews with EA participants, and documentation generated through the course of the reviews. Data were organized using QSR Nvivo, a database software system. In this dissertation, three key contributions are made. The theoretical framework that draws together a number of separate but related fields of study---communicative action, discursive democracy, transformative learning, organizational learning---is the first contribution. The second is verification that organizations learn through participation in EA. Third, empirical support is presented far the assertion that transformative learning can address change beyond that experienced by the individual, to account for both policy-oriented and organizational learning. Related to the second contribution, results indicate that participants of EA engage in Teaming on multiple scales. Furthermore, learning outcomes include both instrumental and communicative learning. Instrumental learning included an increased understanding of technical issues and assessment tools, such as information requests. Communicative teaming outcomes included the importance of dialogue as a means of resolving issues and a refinement of strategies For promoting organizational positions. At an organizational scale, teaming by state actors, including government and tribunals, emphasized mechanisms designed to improve performance within existing structures, or "single-loop learning". Public actors, however, identified more outcomes associated with changes to their theory-in-use, designed to change the structure of the EA process, or "double-loop learning". The discussion of learning supports the application of transformative learning as a framework for considering different scales of learning, the third contribution to research. Findings revealed that individuals and organizations use project specific EA as an opportunity to compel the development and implementation of sustainable initiatives. These findings suggest that higher order learning for sustainability may be occurring through project based EA. Results also revealed the importance of creating opportunities for discussion and debate as a means of engaging organizations in and encouraging learning through EA. These findings support Habermas' emphasis on dialogue as a means of negotiating political systems.
Roles of social impact assessment practitioners
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wong, Cecilia H.M., E-mail: ceciliawonghm@gmail.com; Ho, Wing-chung, E-mail: wingcho@cityu.edu.hk
The effectiveness of social impact assessment (SIA) hinges largely on the capabilities and ethics of the practitioners, yet few studies have dedicated to discuss the expectations for these professionals. Recognising this knowledge gap, we employed the systemic review approach to construct a framework of roles of SIA practitioners from literature. Our conceptual framework encompasses eleven roles, namely project manager of SIA, practitioner of SIA methodologies, social researcher, social strategy developer, social impact management consultant, community developer, visionary, public involvement specialist, coordinator, SIA researcher, and educator. Although these roles have been stratified into three overarching categories, the project, community and SIAmore » development, they are indeed interrelated and should be examined together. The significance of this study is threefold. First, it pioneers the study of the roles of SIA practitioners in a focused and systematic manner. Second, it informs practitioners of the expectations of them thereby fostering professionalism. Third, it prepares the public for SIAs by elucidating the functions and values of the assessment. - Highlights: • We adopt systematic review to construct a framework of roles of social impact assessment (SIA) practitioners from literature. • We use three overarching categorises to stratify the eleven roles we proposed. • This work is a novel attempt to study the work as a SIA practitioner and build a foundation for further exploration. • The framework informs practitioners of the expectations on them thus reinforcing professionalism. • The framework also prepares the public for SIAs by elucidating the functions and values of the assessment.« less
Managed Realignment in Europe: Achievements and Challenges
NASA Astrophysics Data System (ADS)
Esteves, L. S.
2017-12-01
Environmental and financial sustainability associated with climate change adaptation needs are the key drivers leading to the development of national and regional strategies which promote managed realignment. Managed realignment aims to maximise environmental and socioeconomic benefits by creating space for coastal habitats to evolve more naturally. Therefore, the natural adaptive capacity of coastal habitats and the range of ecosystem services they provide are paramount to the success of these strategies. In Europe, most projects involve the creation of intertidal areas by artificially restoring tidal flow into embanked land. Projects generally involve at least one of the following: removal, breach, or realignment of existing coastal protection, controlled tidal restoration and managed retreat (i.e. relocation from risk areas). Since early 1980s, over 140 managed realignment projects have been implemented (or are under construction) in Europe, mainly in the UK, France, Germany, Netherlands, Belgium and Spain, resulting in approximately 15,800 ha of habitat creation. This paper will present an overview of managed realignment initiatives in Europe, summarise achievements so far and discuss ways to overcome commonly faced challenges, focusing on high-level strategy; delivery of objectives at the project level; and public perception. Projects vary greatly as planning must take into account local social and environmental characteristics and constraints. Evidence of benefits gained in each project and their contribution to high level targets need to be quantified and widely disseminated to help attract public support. However, the lack of information and/or undisputable evidence about the realisation of tangible socioeconomic benefits is still hindering public acceptance. The knowledge about how the many social, economic, and technical aspects interact is evolving fast as new policies are formulated, more projects are implemented, and monitoring data are made available.
Awareness of BIM adoption in Brunei
NASA Astrophysics Data System (ADS)
Rahman, Md Motiar
2017-09-01
Building Information Modelling (BIM) is getting increased attention day-by-day due to its many benefits, including clash detection, collaboration between contract parties, visualization future structure, optimized schedule and project control, waste control, design documentation, and harmonized facilities management. As such, many countries have already adopted BIM, and many other countries are exploring the potential of adopting it. However, it is still relatively new and unknown to some other countries like Brunei. This study was therefore undertaken to generate and/or gauge the awareness of Brunei construction industry participants, targeting adoption of BIM, through a structured questionnaire survey. Responses from 90 industry participants reveal that Brunei Construction industry is not well aware of BIM, lack the required technical knowledge and application in construction, and cost involvement. They are unsure about the potential benefits and barriers to implementing BIM. However, respondents are hopeful that BIM can bring the required changes in construction, willing to adopt BIM, expects cliental support with initial investment for its adoption, and believe that BIM is the future of construction project information management. On the whole, private sector was seen to be more aware on BIM than public sector. The study outcomes are expected to provide the policy makers a first-hand information on the industry awareness on BIM, which in turn help them for further exploration / examination and to design any action plan and guidelines for BIM adoption.
NASA Astrophysics Data System (ADS)
Evans, Dafydd Wyn; Zacharias, Norbert; Kumkova, Irina; Andrei, Alexandre; Brown, Anthony; Gouda, Naoteru; Popescu, Petre; Souchay, Jean; Unwin, Stephen; Zhu, Zi
2012-04-01
Gaia is continuing well with its development and construction and is expected to achieve parallax accuracies of about 10 to 300 μas for 6 to 20 mag. It is scheduled to launch in 2013. The ICRF2 was adopted by the IAU in 2009 as the new fundamental celestial reference frame. The UCAC project concluded with the publication of its 4th data release (all-sky, over 100 million stars). The JASMINE project will launch the Nano-JASMINE satellite in 2012 and continues with the development of its other satellites which will complement the Gaia project. The PPMXL (Heidelberg) and XPM (Ukraine) catalogues provide improved astrometric accuracies from new reductions of USNO-B (USNO-A) and 2MASS data. It is disappointing that the SIM project was cancelled during this triennium. It would have further complemented the above two satellite projects and would have gone even beyond Gaia in astrometric accuracy.
Public Space in Barcelona (1992-2017) - Evolution and Case Studies
NASA Astrophysics Data System (ADS)
Sanfeliu Arboix, Ignacio; Martín, Estefanía
2017-10-01
The construction of the public space has become in the last decades something so important and fundamental in the architecture of the cities, that requires a specific discipline and a concrete study that evaluates the characteristics and actions on it. Not already from an urbanistic perspective but from its own design and constructive perspective, with its character as a place for everyone and for everything, must gather a series of elements that are unique to this space. Barcelona is one of the densest cities in the world that, since the end of the s. XX until our days, tries to solve the public space with a design of quality and optimum. The shortage of public space, which also hosts more than eight million tourists each year, makes it necessary to propose a type of meticulous intervention in order to accommodate all types of users and activities. From the first Universal Exhibition of 1888 through 1929 to the 1992 Olympics as the most important stimulus for this renewal of urban space, Barcelona has been rethinking and evolving in the modus operandi in terms of its urban space. From our professional experience as architects both in the municipal, private and university spheres, we believe that it is our responsibility to confer the public space, that is to say, the design of the urban infrastructure with the attributes necessary to consolidate it in a space Suitable for all without exception and as a place of expression of citizenship. Through the projects of public space developed in our office we will analyze this change of procedure in the construction of squares, parks and other spaces in the city of Barcelona.
NASA Astrophysics Data System (ADS)
Zhu, Liping
2017-05-01
New energy car charging equipment is the development and popularization of new energy vehicles. It has the nature of quasi-public goods. Due to the large number of construction projects, wide distribution, big investment, it needs huge sums of money. PPP mode is a new financing model and has the inherent driving force to lead the idea the technology and the system innovation. The government and the social subject cooperate on the basis of the spirit of contract thus achieve benefit sharing. This mode effectively improve the operation of new energy vehicle charging facilities operating efficiency
Solidification of Savannah River plant high level waste
NASA Astrophysics Data System (ADS)
Maher, R.; Shafranek, L. F.; Kelley, J. A.; Zeyfang, R. W.
1981-11-01
Authorization for construction of the Defense Waste Processing Facility (DWPF) is expected in FY-83. The optimum time for stage 2 authorization is about three years later. Detailed design and construction will require approximately five years for stage 1, with stage 2 construction completed about two to three years later. Production of canisters of waste glass would begin in 1988, and the existing backlog of high level waste sludge stored at SRP would be worked off by about the year 2000. Stage 2 operation could begin in 1990. The technology and engineering are ready for construction and eventual operation of the DWPF for immobilizing high level radioactive waste at Savannah River Plant (SRP). Proceeding with this project will provide the public, and the leadership of this country, with a crucial demonstration that a major quanitity of existing high level nuclear wastes can be safely and permanently immobilized.
Barbosa, Lidiany Silva
2011-01-01
The article analyzes the role played by engineers in the construction of road infrastructure in Minas Gerais between the 1840s and 1880s. Building and providing regular maintenance for roads and bridges was a task carried out by the Minas Gerais provincial government, which since the 1830s had a specific agency assigned to designing, building, and maintaining public communication routes. Engineers were part of the agency from its inception, playing a significant role in designing projects and in the actual execution of certain works. The current study is grounded in administrative documentation in which the details of work progress are reported to the provincial government. The gathered records provide technical, administrative, and financial information, along with data on labor power and the agents engaged in construction works.
Exploitation and Benefits of BIM in Construction Project Management
NASA Astrophysics Data System (ADS)
Mesároš, Peter; Mandičák, Tomáš
2017-10-01
BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.
Disaster risk reduction in developing countries: costs, benefits and institutions.
Kenny, Charles
2012-10-01
Some 60,000 people worldwide die annually in natural disasters, mostly due to the collapse of buildings in earthquakes, and primarily in the developing world. This is despite the fact that engineering solutions exist that can eliminate almost completely the risk of such deaths. Why is this? The solutions are expensive and technically demanding, so their cost-benefit ratio often is unfavourable as compared to other interventions. Nonetheless, there are various public disaster risk reduction interventions that are highly cost-effective. That such interventions frequently remain unimplemented or ineffectively executed points to a role for issues of political economy. Building regulations in developing countries appear to have limited impact in many cases, perhaps because of inadequate capacity and corruption. Public construction often is of low quality, perhaps for similar reasons. This suggests the need for approaches that emphasise simple and limited disaster risk regulation covering only the most at-risk structures-and that, preferably, non-experts can monitor-as well as numerous transparency and oversight mechanisms for public construction projects. © 2012 The Author(s). Journal compilation © Overseas Development Institute, 2012.
Covert, Michael
2012-01-01
Hospital construction is a significant event in any health system. The financial implications are great, especially at a time of shrinking capital resources. Personnel are affected, as are the processes to perform their tasks. Often, new facilities are catalysts that change organizational culture; it has been clearly shown that new facilities have a positive impact on patient satisfaction scores. The members of the C-suite of a hospital/health system play important roles in construction projects. However, no one is more critical to the success of such major endeavors than the chief executive officer (CEO). The CEO sets the tone for the project, giving direction to the design and construction process that may have implications for the rest of the organization. Palomar Pomerado Health (PPH) is the largest public health district in California. In 2002, the PPH governing board authorized the creation of a new facility master plan for the district, which included the construction of a replacement facility for its tertiary care trauma center. The new Palomar Medical Center is slated to open in August 2012. HERD had the opportunity to speak with PPH CEO Michael H. Covert on the role of the CEO in the building of this "fable hospital".
ERIC Educational Resources Information Center
Ghebtsawi, Tesheme
This report illustrates the method, called the "SfB System," recommended in an earlier publication by this organization, for systematization of building projects. The aim of the report is to show how to arrange information on building elements and building construction for clear definition of the parts to be built and for easy…
Pipelining in a changing competitive environment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jones, E.G.; Wishart, D.M.
1996-12-31
The changing competitive environment for the pipeline industry presents a broad spectrum of new challenges and opportunities: international cooperation; globalization of opportunities, organizations and competition; and integrated systems approach to system configuration, financing, contracting strategy, materials sourcing, and operations; cutting edge and emerging technologies; adherence to high standards of environmental protection; an emphasis on safety; innovative approaches to project financing; and advances in technology and programs to maintain the long term, cost effective integrity of operating pipeline systems. These challenges and opportunities are partially a result of the increasingly competitive nature of pipeline development and the public`s intolerance to incidentsmore » of pipeline failure. A creative systems approach to these challenges is often the key to the project moving ahead. This usually encompasses collaboration among users of the pipeline, pipeline owners and operators, international engineering and construction companies, equipment and materials suppliers, in-country engineers and constructors, international lending agencies and financial institutions.« less
Code of Federal Regulations, 2010 CFR
2010-04-01
... contract. This does not involve construction project management as defined in paragraph (d) of this section...) Construction project management means direct responsibility for the construction project through day-to-day on-site management and administration of the project. Activities may include cost management, project...
The method of selecting an integrated development territory for the high-rise unique constructions
NASA Astrophysics Data System (ADS)
Sheina, Svetlana; Shevtsova, Elina; Sukhinin, Alexander; Priss, Elena
2018-03-01
On the basis of data provided by the Department of architecture and urban planning of the city of Rostov-on-don, the problem of the choice of the territory for complex development that will be in priority for the construction of high-rise and unique buildings is solved. The objective of the study was the development of a methodology for selection of the area and the implementation of the proposed method on the example of evaluation of four-territories complex development. The developed method along with standard indicators of complex evaluation considers additional indicators that assess the territory from the position of high-rise unique building. The final result of the study is the rankings of the functional priority areas that takes into account the construction of both residential and public and business objects of unique high-rise construction. The use of the developed methodology will allow investors and customers to assess the investment attractiveness of the future unique construction project on the proposed site.
Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective
NASA Astrophysics Data System (ADS)
Subramanyam, K.; Haridharan, M. K.
2017-07-01
Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.
Bourdeaux, Margaret Ellis; Lawry, Lynn; Bonventre, Eugene V; Burkle, Frederick M
2010-03-01
To review the history and goals of the US Department of Defense's largest civilian assistance program, the Overseas Humanitarian, Disaster and Civic Aid Program and to describe the number, geographic regions, years, key words, countries, and types of projects carried out under this program since 2001. Using the program's central database, we reviewed all approved projects since 2001 and tabulated them by year, combatant command, country, and key word. We also reviewed the project descriptions of projects funded between January 1, 2006, and February 9, 2008, and examined how their activities varied by combatant command and year. Of the 5395 projects in the database, 2097 were funded. Projects took place in more than 90 countries, with Southern, Pacific, and Africa Command hosting the greatest number. The most common types of projects were school, health, disaster response, and water infrastructure construction, and disaster-response training. The "global war on terror" was the key word most frequently tagged to project descriptions. Project descriptions lacked stated goals as well as implementation and coordination strategies with potential partners, and did not report outcome or impact indicators. The geographic reach of the program is vast and projects take place in a wide variety of public sectors. Yet their security and civilian assistance value remains unclear given the lack of stated project goals, implementation strategies, or measures of effectiveness. To facilitate transparency and policy discussion, we recommend project proposals include hypotheses as to how they will enhance US security, their relevance to the public sector they address, and outcome and impact indicators that can assess their value and effectiveness.
NASA Technical Reports Server (NTRS)
1978-01-01
The building in the top photo is the new home of the National Permanent Savings Bank in Washington, D.C., designed by Hartman-Cox Architects. Its construction was based on a money-saving method of preparing building specifications which derived from NASA technology developed to obtain quality construction while holding down cost of launch facilities, test centers and other structures. Written technical specifications spell out materials and components to be used on construction projects and identify the quality tests each item must pass. Specifications can have major impact on construction costs. Poorly formulated specifications can lead to unacceptable construction which must be replaced, unnecessarily high materials costs, safety hazards, disputes and often additional costs due to delays and litigation. NASA's Langley Research Center developed a novel approach to providing accurate, uniform, cost-effective specifications which can be readily updated to incorporate new building technologies. Called SPECSINTACT, it is a computerized - system accessible to all NASA centers involved in construction programs. The system contains a comprehensive catalog of master specifications applicable to many types of construction. It enables designers of any structure to call out relevant sections from computer storage and modify them to fit the needs of the project at hand. Architects and engineers can save time by concentrating their efforts on needed modifications rather than developing all specifications from scratch. Successful use of SPECSINTACT has led to a number of spinoff systems. One of the first was MASTERSPEC, developed from NASA's experience by Production Systems for Architects and Engineers, Inc., an organization established by the American Institute of Architects. MASTERSPEC, used in construction of the bank building pictured, follows the same basic format as SPECSINTACT and can be used in either automated or manual modes. The striking appearance of the bank building shows that, while MASTERSPEC saves time and money, its use involves no sacrfice in architectural design freedom. The Naval Engineering Facilities Command employs an automated specifications system based on SPECSINTACT. The Public Buildings Service of the General Services Administration used SPECSINTACT as a starting point in a plan to make its guideline specifications available to architects and engineers on a nationwide computer network. Public Technology, Inc., a NASA Technology Application Team, is working with Production Systems for Architects and Engineers, Inc., to promote widespread use of the system by state and local governments for cost benefits to taxpayers.
Griffith Energy Project Final Environmental Impact Statement
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
1999-04-02
Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner,more » needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vine, E.
1990-11-01
As part of Lawrence Berkeley Laboratory's (LBL) technical assistance to the Sustainable City Project, compliance and enforcement activities related to local and state building codes for existing and new construction were evaluated in two case studies. The analysis of the City of San Francisco's Residential Energy Conservation Ordinance (RECO) showed that a limited, prescriptive energy conservation ordinance for existing residential construction can be enforced relatively easily with little administrative costs, and that compliance with such ordinances can be quite high. Compliance with the code was facilitated by extensive publicity, an informed public concerned with the cost of energy and knowledgeablemore » about energy efficiency, the threat of punishment (Order of Abatement), the use of private inspectors, and training workshops for City and private inspectors. The analysis of California's Title 24 Standards for new residential and commercial construction showed that enforcement of this type of code for many climate zones is more complex and requires extensive administrative support for education and training of inspectors, architects, engineers, and builders. Under this code, prescriptive and performance approaches for compliance are permitted, resulting in the demand for alternative methods of enforcement: technical assistance, plan review, field inspection, and computer analysis. In contrast to existing to construction, building design and new materials and construction practices are of critical importance in new construction, creating a need for extensive technical assistance and extensive interaction between enforcement personnel and the building community. Compliance problems associated with building design and installation did occur in both residential and nonresidential buildings. 12 refs., 5 tabs.« less
FULL SCALE BIOREACTOR LANDFILL FOR CARBON SEQUESTRATION AND GREENHOUSE EMISSION CONTROL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ramin Yazdani; Jeff Kieffer; Heather Akau
2003-12-01
The Yolo County Department of Planning and Public Works is constructing a full-scale bioreactor landfill as a part of the Environmental Protection Agency's (EPA) Project XL program to develop innovative approaches for carbon sequestration and greenhouse emission control. The overall objective is to manage landfill solid waste for rapid waste decomposition and maximum landfill gas generation and capture for carbon sequestration and greenhouse emission control. Waste decomposition is accelerated by improving conditions for either the aerobic or anaerobic biological processes and involves circulating controlled quantities of liquid (leachate, groundwater, gray water, etc.), and, in the aerobic process, large volumes ofmore » air. The first phase of the project entails the construction of a 12-acre module that contains a 6-acre anaerobic cell, a 3.5-acre anaerobic cell, and a 2.5-acre aerobic cell at the Yolo County Central Landfill near Davis, California. The cells are highly instrumented to monitor bioreactor performance. Liquid addition has commenced in the 3.5-acre anaerobic cell and the 6-acre anaerobic cell. Construction of the 2.5-acre aerobic cell and biofilter has been completed. The remaining task to be completed is to test the biofilter prior to operation, which is currently anticipated to begin in January 2004. The current project status and preliminary monitoring results are summarized in this report.« less
Evered, Emine Ö; Evered, Kyle T
2013-04-01
In its initial years, the nascent Turkish republic established the Ministry of Health and Social Assistance in order to promote public health. Beyond simply facilitating its modernizing agenda for the emergent nation-state as it sought to define itself against an Ottoman past, this institution was also geared toward remedying a self-defined population crisis by prioritizing and confronting particular diseases and health conditions. One of the maladies of utmost concern was syphilis. Based upon an analysis of official primary sources, this article engages with how the developing republic distinguished and consequently politically constructed-or framed-the syphilis problem from the vantage of its new forward capital, Ankara. Integral to this project of confronting this sexually transmitted disease, public health officials projected upon both this ailment and their understanding of the suitable means for its treatment their own views of what constituted appropriate sexual practices and relations. In doing so, certain subgroups of the population, especially prostitutes, were particularized as targets for surveillance and policing through regimes of licensing and compulsory medical examinations. Stemming from the state's framing of the disease-and its definition of appropriate sexual practices-this article also examines the subsequent legislative and public health education projects that followed.
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2012 CFR
2012-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
Crowder College MARET Center Facility Final Scientific/Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rand, Amy
This project was a research facility construction project and did not include actual research. The new facility will benefit the public by providing training opportunities for students, as well as incubator and laboratory space for entrepreneurs in the areas of alternative and renewable energies. The 9,216 -square-foot Missouri Alternative and Renewable Energy Technology (MARET) Center was completed in late 2011. Classes in the MARET Center began in the spring 2012 semester. Crowder College takes pride in the MARET Center, a focal point of the campus, as the cutting edge in education, applied research and commercial development in the growing fieldmore » of green technology.« less
Construction Cost Growth for New Department of Energy Nuclear Facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kubic, Jr., William L.
Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facilitymore » (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.« less
Mapping of information and identification of construction waste at project life cycle
NASA Astrophysics Data System (ADS)
Wibowo, Mochamad Agung; Handayani, Naniek Utami; Nurdiana, Asri; Sholeh, Moh Nur; Pamungkas, Gita Silvia
2018-03-01
The development of construction project towards green construction is needed in order to improve the efficiency of construction projects. One that needs to be minimized is construction waste. Construction waste is waste generated from construction project activities, both solid waste and non solid waste. More specifically, the waste happens at every phase of the project life cycle. Project life cycle are the stage of idea, design, construction, and operation/maintenance. Each phase is managed by different stakeholders. Therefore it requires special handling from the involved stakeholders. The objective of the study is to map the information and identify the waste at each phase of the project life cycle. The purpose of mapping is to figure out the process of information and product flow and with its timeline. This mapping used Value Stream Mapping (VSM). Identification of waste was done by distributing questionnaire to respondents to know the waste according to owner, consultant planner, contractor, and supervisory consultant. The result of the study is the mapping of information flow and product flow at the phases of idea, design, construction, and operation/ maintenance.
Bluetooth as a Playful Public Art Interface
NASA Astrophysics Data System (ADS)
Stukoff, Maria N.
This chapter investigates how the application of emergent communication technologies assisted in the design of playful art experience in a public place. Every Passing Moment (EPM), was a mobile public artwork that tracked and recorded any discoverable Bluetooth device to automatically seed a flower in a virtual garden projected onto an urban screen. The EPM was the first public art work to run blu_box, a custom-designed Bluetooth system for mobile telephony. The aim of blu_box was to build a system that supported playful interactions between the public and an urban screen, openly accessible to anyone with a Bluetooth-enabled mobile phone. This participatory engagement was observed in EPM on three levels, namely; unconscious, conscious, and dynamic play. Furthermore, this chapter highlights how sound and face-to-face communication proved imperative in the play dynamics of EPM. In conclusion, this chapter proposes ways in which the use of emergent communication technologies in public places, especially when interfaced with urban screening platforms, can construct playful city spaces for the public at large.
Research funding. Big names or big ideas: do peer-review panels select the best science proposals?
Li, Danielle; Agha, Leila
2015-04-24
This paper examines the success of peer-review panels in predicting the future quality of proposed research. We construct new data to track publication, citation, and patenting outcomes associated with more than 130,000 research project (R01) grants funded by the U.S. National Institutes of Health from 1980 to 2008. We find that better peer-review scores are consistently associated with better research outcomes and that this relationship persists even when we include detailed controls for an investigator's publication history, grant history, institutional affiliations, career stage, and degree types. A one-standard deviation worse peer-review score among awarded grants is associated with 15% fewer citations, 7% fewer publications, 19% fewer high-impact publications, and 14% fewer follow-on patents. Copyright © 2015, American Association for the Advancement of Science.
Effective Safety Management in Construction Project
NASA Astrophysics Data System (ADS)
Othman, I.; Shafiq, Nasir; Nuruddin, M. F.
2017-12-01
Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.
Blake, Judith A; Harris, Midori A
2008-09-01
Scientists wishing to utilize genomic data have quickly come to realize the benefit of standardizing descriptions of experimental procedures and results for computer-driven information retrieval systems. The focus of the Gene Ontology project is three-fold. First, the project goal is to compile the Gene Ontologies: structured vocabularies describing domains of molecular biology. Second, the project supports the use of these structured vocabularies in the annotation of gene products. Third, the gene product-to-GO annotation sets are provided by participating groups to the public through open access to the GO database and Web resource. This unit describes the current ontologies and what is beyond the scope of the Gene Ontology project. It addresses the issue of how GO vocabularies are constructed and related to genes and gene products. It concludes with a discussion of how researchers can access, browse, and utilize the GO project in the course of their own research. Copyright 2008 by John Wiley & Sons, Inc.
Allocation of control rights in the PPP Project: a cooperative game model
NASA Astrophysics Data System (ADS)
Zhang, Yunhua; Feng, Jingchun; Yang, Shengtao
2017-06-01
Reasonable allocation of control rights is the key to the success of Public-Private Partnership (PPP) projects. PPP are services or ventures which are financed and operated through cooperation between governmental and private sector actors and which involve reasonable control rights sharing between these two partners. After professional firm with capital and technology as a shareholder participating in PPP project firms, the PPP project is diversified in participants and input resources. Meanwhile the allocation of control rights of PPP project tends to be complicated. According to the diversification of participants and input resources of PPP projects, the key participants are divided into professional firms and pure investors. Based on the cost of repurchase of different input resources in markets, the cooperative game relationship between these two parties is analyzed, on the basis of which the allocation model of the cooperative game for control rights is constructed to ensure optimum allocation ration of control rights and verify the share of control rights in proportion to the cost of repurchase.
Research on cost control and management in high voltage transmission line construction
NASA Astrophysics Data System (ADS)
Xu, Xiaobin
2017-05-01
Enterprises. The cost control is of vital importance to the construction enterprises. It is the key to the profitability of the transmission line project, which is related to the survival and development of the electric power construction enterprises. Due to the long construction line, complex and changeable construction terrain as well as large construction costs of transmission line, it is difficult for us to take accurate and effective cost control on the project implementation of entire transmission line. Therefore, the cost control of transmission line project is a complicated and arduous task. It is of great theoretical and practical significance to study the cost control scheme of transmission line project by a more scientific and efficient way. Based on the characteristics of the construction project of the transmission line project, this paper analyzes the construction cost structure of the transmission line project and the current cost control problem of the transmission line project, and demonstrates the necessity and feasibility of studying the cost control scheme of the transmission line project more accurately. In this way, the dynamic cycle cost control process including plan, implementation, feedback, correction, modification and re-implement is achieved to realize the accurate and effective cost control of entire electric power transmission line project.
Research on the application of BIM technology in the whole life cycle of construction projects
NASA Astrophysics Data System (ADS)
Chang-liu, CHEN; Wei-wei, KOU; Shuai-hua, YE
2018-05-01
BIM technology can realize information sharing, and good BIM application will reduce the whole life cycle cost of construction projects. The popularization of BIM technology challenges the application of BIM technology at all stages of the whole life cycle of the construction project. It will give full play to the value of BIM, if developing a reasonable BIM project execution plan, defining BIM requirements, specifying Level of Development, determining the BIM quality control plan and clearing BIM application content of each stage, and will provide a unified method for project stakeholders, realize the whole life cycle of construction projects, and achieve the desired information sharing in construction project.
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2010 CFR
2010-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2012 CFR
2012-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2014 CFR
2014-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2011 CFR
2011-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2013 CFR
2013-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 2001 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shaw, R. Todd; Sexton, Amy D.
The Umatilla River Basin Anadromous Fish Habitat Enhancement Project continued to identify impacted stream reaches throughout the Umatilla River Basin for habitat improvements during the 2001 project period. Public outreach efforts, biological and physical monitoring, and continued development of a Umatilla Subbasin Watershed Assessment assisted the project in fostering public cooperation, targeting habitat deficiencies and determining habitat recovery measures. Projects continued to be maintained on 49 private properties, one 25-year Non-Exclusive Bureau of Indian Affairs' Easement was secured, six new projects implemented and two existing project areas improved to enhance anadromous fish habitat. New project locations included sites on themore » mid Umatilla River, upper Umatilla River, Mission Creek, Cottonwood Creek and Buckaroo Creek. New enhancements included: (1) construction of 11,264 feet of fencing between River Mile 43.0 and 46.5 on the Umatilla River, (2) a stream bank stabilization project implemented at approximately River Mile 63.5 Umatilla River to stabilize 330 feet of eroding stream bank and improve instream habitat diversity, included construction of eight root wad revetments and three boulder J-vanes, (3) drilling a 358-foot well for off-stream livestock watering at approximately River Mile 46.0 Umatilla River, (4) installing a 50-foot bottomless arch replacement culvert at approximately River Mile 3.0 Mission Creek, (5) installing a Geoweb stream ford crossing on Mission Creek (6) installing a 22-foot bottomless arch culvert at approximately River Mile 0.5 Cottonwood Creek, and (7) providing fence materials for construction of 21,300 feet of livestock exclusion fencing in the Buckaroo Creek Drainage. An approximate total of 3,800 native willow cuttings and 350 pounds of native grass seed was planted at new upper Umatilla River, Mission Creek and Cottonwood Creek project sites. Habitat improvements implemented at existing project sites included development of a 105-foot well for off-stream livestock watering at approximately River Mile 12.0 Wildhorse Creek and construction of an engineered stream ford at approximately River Mile 3.0 Mission Creek. A total of $277,848 in financial cost share assistance was provided by the Confederated Tribes of the Umatilla Indian Reservation, U.S. Bureau of Indian Affairs, U.S. Environmental Protection Agency, U.S. Department of Agriculture, National Oceanic and Atmospheric Administration, U.S. Workforce Investment Act, Oregon Watershed Enhancement Board, Umatilla County and Pheasants Forever for planning efforts and habitat enhancements. Monitoring continued to quantify baseline conditions and the effects of habitat enhancements in the upper basin. Daily stream temperatures were collected from June through September at 22 sites. Suspended sediment samples were obtained at three gage stations to arrive at daily sediment load estimates. Photographs were taken at 96 existing and three newly established photo points to document habitat recovery and pre-project conditions. Transects were measured at three stream channel cross sections to assist with engineering and design and to obtain baseline data regarding channel morphology. Biological inventories were conducted at River Mile 3.0 Mission Creek to determine pre-project fish utilization above and below the passage barrier. Post-project inventories were also conducted at River Mile 85.0 of the Umatilla River at a project site completed in 1999. Umatilla Subbasin Watershed Assessment efforts were continued under a subcontract with Eco-Pacific. This watershed assessment document and working databases will be completed in fiscal year 2002 and made available to assist project personnel with sub-watershed prioritization of habitat needs. Water Works Consulting, Duck Creek Associates and Ed Salminen Consulting were subcontracted for watershed assessment and restoration planning in the Meacham Creek Subwatershed. A document detailing current conditions in the Meacham Creek Subwatershed and necessary restoration actions will be available for review in 2003.« less
The Gene Construction Kit: a new computer program for manipulating and presenting DNA constructs.
Gross, R H
1990-06-01
The Gene Construction Kit is a new tool for manipulating and displaying DNA sequence information. Constructs can be displayed either graphically or as formatted sequence. Segments of DNA can be cut out with restriction enzymes and pasted into other sites. The program keeps track of staggered ends and notifies the user of incompatibilities and offers a choice of ligation options. Each segment of a construct can have its own defined thickness, pattern, direction and color. The sequence listing can be displayed in any font and style in user defined grouping. Nucleotide positions can be displayed as can restriction sites and protein sequences. The DNA can be displayed as either single- or double-stranded. Restriction sites can be readily marked. Alternative views of the DNA can be maintained and the history of the construct automatically stored. Gel electrophoresis patterns can be generated and can be used in cloning project design. Extensive comments can be stored with the construct and can be searched rapidly for key words. High quality illustrations showing multiple editable constructs with added graphics and text information can be generated for slides, posters or publication.
Research on Green Construction Technology Applied at Guangzhou Hongding Building Project
NASA Astrophysics Data System (ADS)
Lou, Yong Zhong
2018-06-01
The green construction technology is the embodiment of sustainable development strategy in the construction industry, and it is a new construction mode which requires a higher environmental protection. Based on the Hongding building project, this paper describes the application and innovation of technical in the process of implementing green construction in the project, as well as the difficulties and characteristics in the specific practice; .The economic and social benefits of green construction are compared to the traditional construction model; .The achievements and experience of the green construction technology are summarized in the project; The ideas and methods in the process of implementing green construction are abstracted; some suggestions are put forward for the development of green construction.
The communication in industrialised building system (IBS) construction project: Virtual environment
NASA Astrophysics Data System (ADS)
Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd
2017-10-01
Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.
Adding Impacts and Mitigation Measures to OpenEI's RAPID Toolkit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vogel, Erin
The Open Energy Information platform hosts the Regulatory and Permitting Information Desktop (RAPID) Toolkit to provide renewable energy permitting information on federal and state regulatory processes. One of the RAPID Toolkit's functions is to help streamline the geothermal permitting processes outlined in the National Environmental Policy Act (NEPA). This is particularly important in the geothermal energy sector since each development phase requires separate land analysis to acquire exploration, well field drilling, and power plant construction permits. Using the Environmental Assessment documents included in RAPID's NEPA Database, the RAPID team identified 37 resource categories that a geothermal project may impact. Examplesmore » include impacts to geology and minerals, nearby endangered species, or water quality standards. To provide federal regulators, project developers, consultants, and the public with typical impacts and mitigation measures for geothermal projects, the RAPID team has provided overview webpages of each of these 37 resource categories with a sidebar query to reference related NEPA documents in the NEPA Database. This project is an expansion of a previous project that analyzed the time to complete NEPA environmental review for various geothermal activities. The NEPA review not only focused on geothermal projects within the Bureau of Land Management and U.S. Forest Service managed lands, but also projects funded by the Department of Energy. Timeline barriers found were: extensive public comments and involvement; content overlap in NEPA documents, and discovery of impacted resources such as endangered species or cultural sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.
The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day systemmore » is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, juniper control, permanent diversions, pump stations, and return-flow cooling systems. Due to funding issues and delays, permitting delays, fire closures and landowner contracting problems, 2 projects were canceled and 7 projects were rescheduled to the 2004 construction season. Project costs in 2003 totaled $115,554.00 with a total amount of $64,981.00 (56%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.« less
John Day Watershed Restoration Projects, annual report 2003.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, Linda
The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day systemmore » is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, juniper control, permanent diversions, pump stations, and return-flow cooling systems. Due to funding issues and delays, permitting delays, fire closures and landowner contracting problems, 2 projects were canceled and 7 projects were rescheduled to the 2004 construction season. Project costs in 2003 totaled $115,554.00 with a total amount of $64,981.00 (56%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.« less
The Challenge of Access: Using Road Construction as a Tool in Counterinsurgency
2011-06-10
northward, as shown in figure 9. Built by the United States in the 1950s, the dam and its downstream channels provide water for irrigation across the...12. DISTRIBUTION / AVAILABILITY STATEMENT Approved for Public Release; Distribution is Unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT This...consolidated Russian control. It also brought Russia closer to an overriding strategic objective, the procurement of a warm water port from which to project
2015-06-01
public release; distribution is unlimited. The US Army Engineer Research and Development Center (ERDC) solves the nation’s toughest engineering and...Framework (PIAF) Timothy K. Perkins and Chris C. Rewerts Construction Engineering Research Laboratory U.S. Army Engineer Research and Development Center...Prepared for U.S. Army Corps of Engineers Washington, DC 20314-1000 Under Project P2 335530, “Cultural Reasoning and Ethnographic Analysis for the
Optimal Inflatable Space Towers with 3 - 100 km Height
NASA Technical Reports Server (NTRS)
Bolonkin, Alexander
2003-01-01
Theory and computations are provided for building inflatable space towers up to one hundred kilometers in height. These towers can be used for tourism, scientific observation of space, observation of the Earth's surface, weather and upper atmosphere, and for radio, television, and communication transmissions. These towers can also be used to launch space ships and Earth satellites. These projects are not expensive and do not require rockets. They require thin strong films composed from artificial fibers and fabricated by current industry. The towers can be built using present technology. The towers can be used (for tourism, communication, etc.) during the construction process and provide self-financing for further construction. The tower design does not require work at high altitudes; all construction can be done at the Earth's surface. The transport system for a tower consists of a small engine (used only for friction compensation) located at the Earth's surface. The tower is separated into sections and has special protection mechanisms in case of damage. Problems involving security, control, repair, and stability of the proposed towers are addressed in other publications. The author is prepared to discuss these and other problems with serious organizations desiring to research and develop these projects.
Relationship between time management in construction industry and project management performance
NASA Astrophysics Data System (ADS)
Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin
2016-08-01
Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.
The Multi-SAG project: filling the MultiDark simulations with semi-analytic galaxies
NASA Astrophysics Data System (ADS)
Vega-Martínez, C. A.; Cora, S. A.; Padilla, N. D.; Muñoz Arancibia, A. M.; Orsi, A. A.; Ruiz, A. N.
2016-08-01
The semi-analytical model sag is a code of galaxy formation and evolution which is applied to halo catalogs and merger trees extracted from cosmological -body simulations of dark matter. This contribution describes the project of constructing a catalog of simulated galaxies by adapting and applying the model sag over two dark matter simulations of the spanish MultiDark Project publicly available. Those simulations have particles, each, in boxes with sizes of 1000 Mpc and 400 Mpc respectively with Planck cosmological parameters. They cover a large range of masses and have halo mass resolutions of , therefore each simulation is able to produce more than 150 millions of simulated galaxies. A detailed description of the method is explained, and the first statistical results are shown.
ERIC Educational Resources Information Center
Agron, Joe
1998-01-01
Examines building-cost trend data for educational facilities from the American School & University's 24th annual Official Education Construction Report for 1997. Data tables list education construction by projects completed; by projected spending; institution type; type of spending; projects projected for completion; and how construction costs…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-11
... Information Collection: Comment Request; Multifamily Project Construction Contract, Building Loan Agreement, and Construction Change Request AGENCY: Office of the Assistant Secretary for Housing, HUD. ACTION.... This Notice also lists the following information: Title of Proposal: Multifamily Project Construction...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
Improvement of the cost-benefit analysis algorithm for high-rise construction projects
NASA Astrophysics Data System (ADS)
Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir
2018-03-01
The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.
Ng, Kok-Hoe
2016-06-01
The study aims to project future trends in living arrangements and access to children's cash contributions and market income sources among older people in Hong Kong. A cell-based model was constructed by combining available population projections, labour force projections, an extrapolation of the historical trend in living arrangements based on national survey datasets and a regression model on income sources. Under certain assumptions, the proportion of older people living with their children may decline from 59 to 48% during 2006-2030. Although access to market income sources may improve slightly, up to 20% of older people may have no access to either children's financial support or market income sources, and will not live with their children by 2030. Family support is expected to contract in the next two decades. Public pensions should be expanded to protect financially vulnerable older people. © 2015 AJA Inc.
25 CFR 1000.240 - What construction programs included in an AFA are subject to this subpart?
Code of Federal Regulations, 2010 CFR
2010-04-01
..., coordination, responsibility for the construction project, day-to-day on-site management on site-management and administration of the project, which may include cost management, project budgeting, project scheduling and... Tribal, facilities and projects. (b) The following programs and activities are not construction programs...
ERIC Educational Resources Information Center
Wang, Heng
2017-01-01
Construction project productivity typically lags other industries and it has been the focus of numerous studies in order to improve the project performance. This research investigated the application of Radio Frequency Identification (RFID) technology on construction projects' supply chain and determined that RFID technology can improve the…
13 CFR 308.1 - Use of funds in Projects constructed under projected cost.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Use of funds in Projects constructed under projected cost. 308.1 Section 308.1 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PERFORMANCE INCENTIVES § 308.1 Use of funds in Projects constructed under...
Overview of the Center for Space Construction
NASA Technical Reports Server (NTRS)
Hearth, Donald P.
1990-01-01
The purpose of this overview is to summarize the objectives and structure of the Center. The center is a major element of the University's initiative to upgrade space-related research and education on the Boulder campus. With the support of NASA's University Space Engineering Research Centers Program, we provide a mechanism for interdisciplinary and system-level space engineering research and training. Twenty faculty members and 56 students from seven academic units are associated with the Center and are interacting with each other and with the CSC Associates. As a result of feedback from the 1989 symposium, we have focused the efforts of the Center during the past several months on Lunar Base construction. This included a system level study of a Lunar Base in an Independent Study Project by a group of students from across the Center during the spring semester. This project is being continued this fall. During the two-year history of the Center, 13 students previously affiliated with the Center have graduated and there have been 55 publications from the Center.
2001-02-08
During a signing ceremony, Ed Gormel (left), executive director of Spaceport Florida Authority, and Roy Bridges Jr., Center Director, respond to a remark from the audience. The two are signing a SERPL Real Property Use Permit Agreement between the two organizations to construct a three-mile roadway. It is the start of a construction project that includes the Space Experiment Research & Processing Laboratory (SERPL). The signing took place outdoors on S.R. 3 prior to a groundbreaking ceremony for the roadway. The road, to be known as Space Commerce Way, will serve the public by providing a 24-hour access route through KSC from S.R. 3 to the NASA Causeway and KSC Visitor Complex. The SERPL project is enabled by a partnership and collaboration between NASA and the State of Florida to create a vital resource for international and commercial space customers. SERPL is considered a magnet facility, and will support the development and processing of life sciences experiments destined for the International Space Station and accommodate NASA, industry and academic researchers performing associated biological research
2001-02-08
Ed Gormel (left), executive director of Spaceport Florida Authority, and Roy Bridges Jr., Center Director, get ready to sign a SERPL Real Property Use Permit Agreement between the two organizations to construct a three-mile roadway. It is the start of a construction project that includes the Space Experiment Research & Processing Laboratory (SERPL). The signing took place outdoors on S.R. 3 prior to a groundbreaking ceremony for the roadway. The road, to be known as Space Commerce Way, will serve the public by providing a 24-hour access route through KSC from S.R. 3 to the NASA Causeway and KSC Visitor Complex. The SERPL project is enabled by a partnership and collaboration between NASA and the State of Florida to create a vital resource for international and commercial space customers. SERPL is considered a magnet facility, and will support the development and processing of life sciences experiments destined for the International Space Station and accommodate NASA, industry and academic researchers performing associated biological research
Solar Living House Final Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walters, Bradley
The Solar Living House is a high-performance solar-powered dwelling designed by a team of faculty and students from the University of Florida, in collaboration with Santa Fe College, the National University of Singapore, and Alachua Habitat for Humanity. The project was designed in accordance with the Solar Decathlon 2015, a research, design, education, and outreach program developed by the U.S. Department of Energy (DOE). The Solar Living House is fundamentally a house for living, centered on people and the activities of daily life while quietly introducing advanced design, construction, and engineering technologies. The 993 square-foot two-bedroom one-bath home was designedmore » to embrace and frame an exterior courtyard space. This courtyard acts as an extension of the interior living spaces, maximizing the spatial potentials of a modest building footprint and introducing natural light into the primary living spaces of the house. Research Outcomes: The Solar Living House advances work on high-performance buildings through three principal technological innovations: wet/dry modular construction, a building automation system, and solar dehumidification systems. Wet / Dry Modular Construction: The house is designed as a series of five modules, including one that is designated as the “wet core.” The wet core consolidates the mechanical systems and bathroom into a single module to reduce plumbing runs, efficiency losses, and on-site construction time. The other four modules are designed to eliminate interior load bearing walls to allow for maximum flexibility in the reconfiguring of the space over time. The modules are designed to meet the structural challenges of both Florida’s hurricanes and California’s earthquakes. Building Automation System: The house is equipped with an integrated building automation system, allowing the houses environmental systems, lights, security systems, and smoke detectors to be programmed, monitored, and controlled through any mobile or computing device. These systems allow for more precise calibrations of temperature/humidity/lighting to correspond with user needs and preferences, minimizing energy losses with economical night- or day-time setbacks. Solar Dehumidification System: The most significant technological innovation in the Solar Living House is the solar thermal dehumidification system. This system generates hot water through two rooftop-mounted evacuated tube solar thermal collectors. The hot water is used to continually dry a regenerative solid desiccant material, typically white silica gel. The solid desiccant is used to adsorb moisture and humidity from the air without additional mechanical cooling. This strategy allows humidity to be modulated independently of air temperature, providing greater thermal comfort and reducing the opportunity for the growth of mold spores within the house while also reducing the overall energy consumption of the HVAC system. Economic Feasibility: The team set aggressive goals for affordability, targeting a construction cost of $138,710. An independent professional cost estimator determined the overall project costs, as designed, would be $333,799, or $336.15 per square foot of finished floor area. This is more than 2.4 times the target construction cost. By comparison, the average construction cost for a home in the United States in 2015 was $289,415, or $103.29 per square foot of finished floor area. Following work on the Solar Living House, team leaders incorporated many of its objectives into a net-zero energy home on a site in Gainesville, Florida. This site-built home avoided many of the constraints and complications of modular construction necessitated by the Solar Decathlon, allowing it to be built for a much more modest budget. This two-bedroom two bath 1,800 square foot home was constructed for $135.39 per square foot, including active photovoltaic solar systems, careful attention to continuous air barriers, increased insulation levels, and permanent site constructions. This project suggest that high-performance buildings can be realized for more modest budgets. Public Benefits: Work on the Solar Living House and Solar Decathlon 2015 offered our student team unparalleled learning opportunities. Because of the duration of the project, a number of students participated at different points in their education, from first year undergraduates all the way through to advanced graduate students. The opportunity for collaboration with students and faculty from the National University of Singapore was also extraordinary, allowing for a sharing of technical knowledge and cultural exchange. The wider public has benefited from this work as its findings have been shared through public presentations and publications. It serves as a useful stepping stone along the path towards affordable, high-performance buildings.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wallace, J.D.; Kleinschmidt, R.; Veevers, P.
1995-12-31
Radiation regulatory authorities have a responsibility for the management of radioactive waste. This, more often than not, includes the collection and safe storage of radioactive sources in disused radiation devices and devices seized by the regulatory authority following an accident, abandonment or unauthorised use. The public aversion to all things radioactive, regardless of the safety controls, together with the Not In My Back Yard (NIMBY) syndrome combine to make the establishment of a radioactive materials store a near impossible task, despite the fact that such a facility is a fundamental tool for regulatory authorities to provide for the radiation safetymore » of the public. In Queensland the successful completion and operational use of such a storage facility has taken a total of 8 years of concerted effort by the staff of the regulatory authority, the expenditure of over $2 million (AUS) not including regulatory staff costs and the cost of construction of an earlier separate facility. This paper is a summary of the major developments in the planning, construction and eventual operation of the facility including technical and administrative details, together with the lessons learned from the perspective of the overall project.« less
Zuluaga, Walter Alonso; López, Yolanda Lucía; Osorio, Lisardo; Salazar, Luis Fernando; González, Marta Claudia; Ríos, Claudia María; Wolff, Marta Isabel; Escobar, José Pablo
2012-09-01
Entomological studies conducted in large hydroelectric infrastructure projects are a tool for the prevention and control of vector-borne diseases. These diseases emerge as a consequence of changes made to the terrain that often increase the natural and artificial mosquito larval habitats. Many of these insects are of public health importance and population increases result in an increased risk of disease transmission. The culicine (mosquito) and phlebotomine (sand fly) populations were characterized in the area of the Porce II and Porce III hydroelectric projects of Antioquia between 1990 to 2009. Periodical entomological samplings were made in the area of impact, in the workers camps, and construction sites. Adult specimens were captured with nets, Shannon light traps, CDC light traps, and protected human bait. Mosquito larvae of the following species were identified: Culex coronator, Culex nigripalpus, Culex corniger, Culex quinquefasciatus and Limatus durhami. The most frequently identifiers of larval habitats were low tanks, waste cans, tires, and aquatic plants. Aedes aegypti specimens were captured in only two rural locations from two municipalities within the area of influence. Specimens from the following mosquito genera were captured in forest areas: Aedes, Mansonia, Culex, Psorophora, Wyeomyia, Phonyomyia, Uranotaenia, Haemagogus and Sabethes. The most important mosquito found was Haemogogus janthinomis, an efficient yellow fever vector in Colombia. The area has been endemic for leishmaniasis and in the current study, 20 species of Lutzomyia sand flies, potential vectors, were identified. Among malaria vectors, the most important species found in the area were Anopheles nuneztovari and Anopheles pseudopunctipennis. A wide variety of vectors were discovered in the area of the Porce II and Porce III hydroelectric projects, and many of these were relevant for public health. Further monitoring will be necessary to minimize disease transmission risks among the workers and the inhabitants of the surrounding areas.
Application of BIM technology in construction bidding
NASA Astrophysics Data System (ADS)
wei, Li
2017-12-01
bidding is a very important step of construction project. For the owners, bidding is the key link of selecting the best construction plan and saving the project cost to the maximum extent. For Construction Corporation, it is the key to show their construction technology which can improve the probability of winning the bid. this paper researches on the application of BIM technology in bidding process of construction project in detail, and discussesthe application of BIM technology in construction field comprehensively.
The Application of the Real Options Method for the Evaluation of High-Rise Construction Projects
NASA Astrophysics Data System (ADS)
Izotov, Aleksandr; Rostova, Olga; Dubgorn, Alissa
2018-03-01
The paper is devoted to the problem of evaluation of high-rise construction projects in a rapidly changing environment. The authors proposed an algorithm for constructing and embedding real options in high-rise construction projects, which makes it possible to increase the flexibility of managing multi-stage projects that have the ability to adapt to changing conditions of implementation.
The potential inclusion of value management subject for postgraduate programmes in Malaysia
NASA Astrophysics Data System (ADS)
Che Mat, M.; Karim, S. B. Abd; Amran, N. A. E.
2018-02-01
The development of construction industry is increasing tremendously. To complement with this scenario, Value Management (VM) is needed to achieve the optimum function by reducing or eliminating the unnecessary cost that does not contribute to the product, system or service. As VM has been increasingly applied to enhance and improve value in construction projects, the purpose of this study is to implement VM as a subject for master’s students at selected public universities in Malaysia. The research is conducted to investigate the potential inclusion of VM as a subject at master degree programmes in Malaysia. Questionnaire survey was designed and delivered to existing master students to explore the current understanding of VM as well as the possibility of introducing VM as a subject. The results showed that the level of awareness on VM is high, yet the understanding of VM is low. This research presents the result of implementing VM as a subject learning for master’s level programme at selected public universities in Malaysia.
Methodology of project management at implementation of projects of high-rise construction
NASA Astrophysics Data System (ADS)
Papelniuk, Oksana
2018-03-01
High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-02
... Proposed Information Collection to OMB; Multifamily Project Construction Contract, Building Loan Agreement, & Construction Change; HUD Programs AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY.../borrowers, and mortgagees/lenders for construction of multifamily projects and to obtain approval of changes...
Monitoring Environmental Performance Commitments in Construction Projects.
DOT National Transportation Integrated Search
2007-05-01
EPCs are measures implemented during project construction to reduce environmental impacts. These commitments are directed toward the Projects performance period only and focus primarily on reducing the impacts of construction equipment and trucks....
NASA Astrophysics Data System (ADS)
Krechowicz, Maria
2017-10-01
Nowadays, one of the characteristic features of construction industry is an increased complexity of a growing number of projects. Almost each construction project is unique, has its project-specific purpose, its own project structural complexity, owner’s expectations, ground conditions unique to a certain location, and its own dynamics. Failure costs and costs resulting from unforeseen problems in complex construction projects are very high. Project complexity drivers pose many vulnerabilities to a successful completion of a number of projects. This paper discusses the process of effective risk management in complex construction projects in which renewable energy sources were used, on the example of the realization phase of the ENERGIS teaching-laboratory building, from the point of view of DORBUD S.A., its general contractor. This paper suggests a new approach to risk management for complex construction projects in which renewable energy sources were applied. The risk management process was divided into six stages: gathering information, identification of the top, critical project risks resulting from the project complexity, construction of the fault tree for each top, critical risks, logical analysis of the fault tree, quantitative risk assessment applying fuzzy logic and development of risk response strategy. A new methodology for the qualitative and quantitative risk assessment for top, critical risks in complex construction projects was developed. Risk assessment was carried out applying Fuzzy Fault Tree analysis on the example of one top critical risk. Application of the Fuzzy sets theory to the proposed model allowed to decrease uncertainty and eliminate problems with gaining the crisp values of the basic events probability, common during expert risk assessment with the objective to give the exact risk score of each unwanted event probability.
2006 Long Range Development Plan Final Environmental ImpactReport
DOE Office of Scientific and Technical Information (OSTI.GOV)
Philliber, Jeff
2007-01-22
This environmental impact report (EIR) has been prepared pursuant to the applicable provisions of the California Environmental Quality Act (CEQA) and its implementing guidelines (CEQA Guidelines), and the Amended University of California Procedures for Implementation of the California Environmental Quality Act (UC CEQA Procedures). The University of California (UC or the University) is the lead agency for this EIR, which examines the overall effects of implementation of the proposed 2006 Long Range Development Plan (LRDP; also referred to herein as the 'project' for purposes of CEQA) for Lawrence Berkeley National Laboratory (LBNL; also referred to as 'Berkeley Lab,' 'the Laboratory,'more » or 'the Lab' in this document). An LRDP is a land use plan that guides overall development of a site. The Lab serves as a special research campus operated by the University employees, but it is owned and financed by the federal government and as such it is distinct from the UC-owned Berkeley Campus. As a campus operated by the University of California, the Laboratory is required to prepare an EIR for an LRDP when one is prepared or updated pursuant to Public Resources Code Section 21080.09. The adoption of an LRDP does not constitute a commitment to, or final decision to implement, any specific project, construction schedule, or funding priority. Rather, the proposed 2006 LRDP describes an entire development program of approximately 980,000 gross square feet of new research and support space construction and 320,000 gross square feet of demolition of existing facilities, for a total of approximately 660,000 gross square feet of net new occupiable space for the site through 2025. Specific projects will undergo CEQA review at the time proposed to determine what, if any, additional review is necessary prior to approval. As described in Section 1.4.2, below, and in Chapter 3 of this EIR (the Project Description), the size of the project has been reduced since the Notice of Preparation for this EIR was issued. This reduction was in response to consultation with the City of Berkeley as well as other factors. CEQA requires that, before a decision can be made by a state or local government agency to approve a project that may have significant environmental effects, an EIR must be prepared that fully describes the environmental effects of the project. The EIR is a public informational document for use by University decision-makers and the public. It is intended to identify and evaluate potential environmental consequences of the proposed project, to identify mitigation measures that would lessen or avoid significant adverse impacts, and to examine feasible alternatives to the project. The information contained in the EIR is reviewed and considered by the lead agency prior to its action to approve, disapprove, or modify the proposed project.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-30
...The proposed information collection requirement described below has been submitted to the Office of Management and Budget (OMB) for review, as required by the Paperwork Reduction Act. The Department is soliciting public comments on the subject proposal. In 1998, the HUD Reform Act allowed Mixed-Finance public and affordable housing development. Mixed-Finance is the process where public housing funds are mixed with other government and non-government financing in order to encourage the development of mixed-income housing that includes public housing units. In addition, Public Housing Authorities (PHAs) may use other sources of financing to supplement their development or rehabilitation of public housing units. The form and agreements in this Information Collection pertain to the financial closing of a Mixed-Finance housing project's development or rehabilitation. They describe the ownership of, type, size and number of, construction period and permanent financing of, the restrictions on the usage of, and HUD and Federal Government rights to, the public, affordable and market rate rental housing units that are being developed or rehabilitated.
Special Inspector General for Iraq Reconstruction (SIGIR): The Year of Transition in Review
2007-01-30
border forts have been constructed thus far, and 5 points of entry have been completed.315 SIGIR’s ground project surveys inspected 21 border forts and...Gen. Dempsey recently estimated that 20-25% of the National Police “needed to be weeded out.”367 Finally, recent surveys suggest that public...Transportation and Communications system, 33 site surveys have been completed for the communication towers between Mosul and Basrah.409 Phase II
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greenberg, Raymond; Wright, Kyle A.; McCaw, Erica E.
The Global Threat Reduction Initiative (GTRI) reduces and protects vulnerable nuclear and radiological material located at civilian sites worldwide. Internationally, over 40 countries are cooperating with GTRI to enhance the security of these materials. The GTRI program has worked successfully with foreign countries to remove and protect nuclear and radioactive materials, including orphaned and disused high-activity sources. GTRI began cooperation with the Republic of Colombia in April 2004. This cooperation has been a resounding success by securing forty high-risk sites, consolidating disused/orphan sources at an interim secure national storage facility, and developing a comprehensive approach to security, training, and sustainability.more » In 2005 the Colombian Ministry of Mines and Energy requested the Department of Energy’s support in the construction of a new Central Storage Facility (CSF). In December 2005, the Ministry selected to construct this facility at the Institute of Geology and Mining (Ingeominas) site in Bogota. This site already served as Colombia’s national repository, where disused sources were housed in various buildings around the complex. The CSF project was placed under contract in May 2006, but environmental issues and public protests, which led to a class action lawsuit against the Colombian Government, forced the Ministry to quickly suspend activities, thereby placing the project in jeopardy. Despite these challenges, however, the Ministry of Mines and Energy worked closely with public and environmental authorities to resolve these issues, and continued to be a strong advocate of the GTRI program. In June 2008, the Ministry of Mines and Energy was granted the construction and environmental licenses. As a result, construction immediately resumed and the CSF was completed by December 2008. A commissioning ceremony was held for the new facility in January 2009, which was attended by representatives from the Department of Energy, U.S. Embassy, and the Ministry of Mines and Energy, including the Minister and Vice Minister.« less
BIM Methodology Approach to Infrastructure Design: Case Study of Paniga Tunnel
NASA Astrophysics Data System (ADS)
Osello, Anna; Rapetti, Niccolò; Semeraro, Francesco
2017-10-01
Nowadays, the implementation of Building Information Modelling (BIM) in civil design represent a new challenge for the AECO (Architecture, Engineering, Construction, Owner and Operator) world, which will involve the interest of many researchers in the next years. It is due to the incentives of Public Administration and European Directives that aim to improve the efficiency and to enhance a better management of the complexity of infrastructure projects. For these reasons, the goal of this research is to propose a methodology for the use of BIM in a tunnel project, analysing the definition of a correct level of detail (LOD) and the possibility to share information via interoperability for FEM analysis.