Sample records for qualification test procedure

  1. AZ-101 Mixer Pump Test Qualification Test Procedures (QTP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    THOMAS, W.K.

    2000-01-10

    Describes the Qualification test procedure for the AZ-101 Mixer Pump Data Acquisition System (DAS). The purpose of this Qualification Test Procedure (QTP) is to confirm that the AZ-101 Mixer Pump System has been properly programmed and hardware configured correctly. This QTP will test the software setpoints for the alarms and also check the wiring configuration from the SIMcart to the HMI. An Acceptance Test Procedure (ATP), similar to this QTP will be performed to test field devices and connections from the field.

  2. 46 CFR 57.05-4 - Welder qualification by procedure tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Welder qualification by procedure tests. 57.05-4 Section 57.05-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING Performance Qualifications § 57.05-4 Welder qualification by procedure tests...

  3. 46 CFR 57.05-4 - Welder qualification by procedure tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Welder qualification by procedure tests. 57.05-4 Section 57.05-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING Performance Qualifications § 57.05-4 Welder qualification by procedure tests...

  4. 46 CFR 57.05-4 - Welder qualification by procedure tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Welder qualification by procedure tests. 57.05-4 Section 57.05-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING Performance Qualifications § 57.05-4 Welder qualification by procedure tests...

  5. 46 CFR 57.05-4 - Welder qualification by procedure tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Welder qualification by procedure tests. 57.05-4 Section 57.05-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING Performance Qualifications § 57.05-4 Welder qualification by procedure tests...

  6. 46 CFR 57.05-4 - Welder qualification by procedure tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Welder qualification by procedure tests. 57.05-4 Section 57.05-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING Performance Qualifications § 57.05-4 Welder qualification by procedure tests...

  7. AP-102/104 Retrieval control system qualification test procedure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    RIECK, C.A.

    1999-05-18

    This Qualification Test Procedure documents the results of the qualification testing that was performed on the Project W-211, ''Initial Tank Retrieval Systems,'' retrieval control system (RCS) for tanks 241-AP-102 and 241-AP-104. The results confirm that the RCS has been programmed correctly and that the two related hardware enclosures have been assembled in accordance with the design documents.

  8. Development of electrical test procedures for qualification of spacecraft against EID. Volume 2: Review and specification of test procedures

    NASA Technical Reports Server (NTRS)

    Wilkenfeld, J. M.; Harlacher, B. L.; Mathews, D.

    1982-01-01

    A combined experimental and analytical program to develop system electrical test procedures for the qualification of spacecraft against damage produced by space-electron-induced discharges (EID) occurring on spacecraft dielectric outer surfaces is described. A review and critical evaluation of possible approaches to qualify spacecraft against space electron-induced discharges (EID) is presented. A variety of possible schemes to simulate EID electromagnetic effects produced in spacecraft was studied. These techniques form the principal element of a provisional, recommended set of test procedures for the EID qualification spacecraft. Significant gaps in our knowledge about EID which impact the final specification of an electrical test to qualify spacecraft against EID are also identified.

  9. PDSS/IMC qualification test software acceptance procedures

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Tests to be performed for qualifying the payload development support system image motion compensator (IMC) are identified. The performance of these tests will verify the IMC interfaces and thereby verify the qualification test software.

  10. Lightning arrestor connector lead magnesium niobate qualification pellet test procedures.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tuohig, W.; Mahoney, Patrick A.; Tuttle, Bruce Andrew

    2009-02-01

    Enhanced knowledge preservation for DOE DP technical component activities has recently received much attention. As part of this recent knowledge preservation effort, improved documentation of the sample preparation and electrical testing procedures for lead magnesium niobate--lead titanate (PMN/PT) qualification pellets was completed. The qualification pellets are fabricated from the same parent powders used to produce PMN/PT lightning arrestor connector (LAC) granules at HWF&T. In our report, the procedures for fired pellet surface preparation, electrode deposition, electrical testing and data recording are described. The dielectric measurements described in our report are an information only test. Technical reasons for selecting the electrodemore » material, electrode size and geometry are presented. The electrical testing is based on measuring the dielectric constant and dissipation factor of the pellet during cooling from 280 C to 220 C. The most important data are the temperature for which the peak dielectric constant occurs (Curie Point temperature) and the peak dielectric constant magnitude. We determined that the peak dielectric constant for our procedure would be that measured at 1 kHz at the Curie Point. Both the peak dielectric constant and the Curie point parameters provide semi-quantitative information concerning the chemical and microstructural homogeneity of the parent material used for the production of PMN/PT granules for LACs. Finally, we have proposed flag limits for the dielectric data for the pellets. Specifically, if the temperature of the peak dielectric constant falls outside the range of 250 C {+-} 30 C we propose that a flag limit be imposed that will initiate communication between production agency and design agency personnel. If the peak dielectric constant measured falls outside the range 25,000 {+-} 10,000 we also propose that a flag limit be imposed.« less

  11. Development of electrical test procedures for qualification of spacecraft against EID. Volume 1: The CAN test and other relevant data

    NASA Technical Reports Server (NTRS)

    Wilkenfeld, J. M.; Judge, R. J. R.; Harlacher, B. L.

    1982-01-01

    A combined experimental and analytical program to develop system electrical test procedures for the qualification of spacecraft against damage produced by space-electron-induced discharges (EID) occurring on spacecraft dielectric outer surfaces is described. The data on the response of a simple satellite model, called CAN, to electron-induced discharges is presented. The experimental results were compared to predicted behavior and to the response of the CAN to electrical injection techniques simulating blowoff and arc discharges. Also included is a review of significant results from other ground tests and the P78-2 program to form a data base from which is specified those test procedures which optimally simulate the response of spacecraft to EID. The electrical and electron spraying test data were evaluated to provide a first-cut determination of the best methods for performance of electrical excitation qualification tests from the point of view of simulation fidelity.

  12. Results of qualification tests on water-level sensing instruments, 1986

    USGS Publications Warehouse

    Holland, Randolph R.; Rapp, Donald H.

    1988-01-01

    This report presents to users of hydrological instrumentation and U.S. Geological Survey procurement personnel a list of instruments that have met or exceeded the Survey 's minimum performance requirements for water level sensing instruments. The Hydrologic Instrumentation Facility at the National Space Technology Laboratories, Mississippi conducted qualification tests on four instrument systems. The data collected are summarized, brief system descriptions are given, qualification testing purposes and procedures are summarized, and results are given for each of the three systems that met performance requirements. The fourth system was returned to the manufacturer , because in preliminary testing the instrument system did not perform properly according to the manufacturer 's operating procedures. As a result of the qualification tests, the three systems that met performance requirements have been included on the Survey 's Qualified Products List. (USGS)

  13. 14 CFR 60.27 - Automatic loss of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Automatic loss of qualification and procedures for restoration of qualification. 60.27 Section 60.27 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  14. 14 CFR 60.29 - Other losses of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Other losses of qualification and procedures for restoration of qualification. 60.29 Section 60.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  15. 14 CFR 60.27 - Automatic loss of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Automatic loss of qualification and procedures for restoration of qualification. 60.27 Section 60.27 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  16. 14 CFR 60.29 - Other losses of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Other losses of qualification and procedures for restoration of qualification. 60.29 Section 60.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  17. 14 CFR 60.29 - Other losses of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Other losses of qualification and procedures for restoration of qualification. 60.29 Section 60.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  18. 14 CFR 60.29 - Other losses of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Other losses of qualification and procedures for restoration of qualification. 60.29 Section 60.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  19. 14 CFR 60.27 - Automatic loss of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Automatic loss of qualification and procedures for restoration of qualification. 60.27 Section 60.27 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  20. 14 CFR 60.29 - Other losses of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Other losses of qualification and procedures for restoration of qualification. 60.29 Section 60.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  1. 14 CFR 60.27 - Automatic loss of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Automatic loss of qualification and procedures for restoration of qualification. 60.27 Section 60.27 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  2. 14 CFR 60.27 - Automatic loss of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Automatic loss of qualification and procedures for restoration of qualification. 60.27 Section 60.27 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  3. Guide for Oxygen Component Qualification Tests

    NASA Technical Reports Server (NTRS)

    Bamford, Larry J.; Rucker, Michelle A.; Dobbin, Douglas

    1996-01-01

    Although oxygen is a chemically stable element, it is not shock sensitive, will not decompose, and is not flammable. Oxygen use therefore carries a risk that should never be overlooked, because oxygen is a strong oxidizer that vigorously supports combustion. Safety is of primary concern in oxygen service. To promote safety in oxygen systems, the flammability of materials used in them should be analyzed. At the NASA White Sands Test Facility (WSTF), we have performed configurational tests of components specifically engineered for oxygen service. These tests follow a detailed WSTF oxygen hazards analysis. The stated objective of the tests was to provide performance test data for customer use as part of a qualification plan for a particular component in a particular configuration, and under worst-case conditions. In this document - the 'Guide for Oxygen Component Qualification Tests' - we outline recommended test systems, and cleaning, handling, and test procedures that address worst-case conditions. It should be noted that test results apply specifically to: manual valves, remotely operated valves, check valves, relief valves, filters, regulators, flexible hoses, and intensifiers. Component systems are not covered.

  4. 46 CFR 2.75-70 - Welding procedure and performance qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Welding procedure and performance qualifications. 2.75... for Construction Personnel § 2.75-70 Welding procedure and performance qualifications. (a) Welding... requirements for the welding of pressure piping, boilers, pressure vessels, and nonpressure vessel type tanks...

  5. 46 CFR 2.75-70 - Welding procedure and performance qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Welding procedure and performance qualifications. 2.75... for Construction Personnel § 2.75-70 Welding procedure and performance qualifications. (a) Welding... requirements for the welding of pressure piping, boilers, pressure vessels, and nonpressure vessel type tanks...

  6. 46 CFR 2.75-70 - Welding procedure and performance qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Welding procedure and performance qualifications. 2.75... for Construction Personnel § 2.75-70 Welding procedure and performance qualifications. (a) Welding... requirements for the welding of pressure piping, boilers, pressure vessels, and nonpressure vessel type tanks...

  7. 46 CFR 2.75-70 - Welding procedure and performance qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Welding procedure and performance qualifications. 2.75... for Construction Personnel § 2.75-70 Welding procedure and performance qualifications. (a) Welding... requirements for the welding of pressure piping, boilers, pressure vessels, and nonpressure vessel type tanks...

  8. 46 CFR 2.75-70 - Welding procedure and performance qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Welding procedure and performance qualifications. 2.75... for Construction Personnel § 2.75-70 Welding procedure and performance qualifications. (a) Welding... requirements for the welding of pressure piping, boilers, pressure vessels, and nonpressure vessel type tanks...

  9. Results of qualification tests on water-level sensing instruments, 1987

    USGS Publications Warehouse

    Olive, T.E.

    1989-01-01

    The U.S. Geological Survey 's Hydrologic Instrumentation Facility at the Stennis Space Center, Mississippi, conducts qualification tests on water level sensing instruments. Instrument systems, which meet or exceed the Survey 's minimum performance requirements, are placed on the Survey 's Qualified Products List. The qualification tests conducted in 1987 added two instrument systems to the Survey 's Qualified Products List. One system met requirements for use at a daily-discharge station , and the other system met requirements for a special-case station. The report is prepared for users of hydrologic instruments. The report provides a list of instrument features, describes the instrument systems, summarizes test procedures, and presents test results for the two instrument systems that met the Survey 's minimum performance standards for the 1987 round of qualification tests. (USGS)

  10. Test report: Electron-proton spectrometer qualification test unit, qualification test

    NASA Technical Reports Server (NTRS)

    Vincent, D. L.

    1972-01-01

    Qualification tests of the electron-proton spectrometer test unit are presented. The tests conducted were: (1) functional, (2) thermal/vacuum, (3) electromagnetic interference, (4) acoustic, (5) shock, (6) vibration, and (7) humidity. Results of each type of test are presented in the form of data sheets.

  11. Hot-spot qualification testing of concentrator modules

    NASA Technical Reports Server (NTRS)

    Gonzalez, C. C.; Sugimura, R. S.; Ross, R. G., Jr.

    1987-01-01

    Results of a study to determine the hot-spot susceptibility of concentrator cells, to provide a hot-spot qualification test for concentrator modules, and to provide guidelines for reducing hot-spot susceptibility are presented. Hot-spot heating occurs in a photovoltaic module when the short-circuit current of a cell is lower than the string operating current, forcing the cell into reverse bias with a concurrent power dissipation. Although the basis for the concentrator-module hot-spot qualification test is the test developed for flat-plate modules, issues such as providing cell illumination introduce additional complexities into the testing procedure. The results indicate that the same general guidelines apply to protecting concentrator modules from hot-spot stressing as apply to flat-plate modules, and recommendations are made on the number of bypass diodes required per given number of series cells per module or source circuit. A method for determining the cell temperature in the laboratory or in the field is discussed.

  12. Environmental Test Screening Procedure

    NASA Technical Reports Server (NTRS)

    Zeidler, Janet

    2000-01-01

    This procedure describes the methods to be used for environmental stress screening (ESS) of the Lightning Mapper Sensor (LMS) lens assembly. Unless otherwise specified, the procedures shall be completed in the order listed, prior to performance of the Acceptance Test Procedure (ATP). The first unit, S/N 001, will be subjected to the Qualification Vibration Levels, while the remainder will be tested at the Operational Level. Prior to ESS, all units will undergo Pre-ESS Functional Testing that includes measuring the on-axis and plus or minus 0.95 full field Modulation Transfer Function and Back Focal Length. Next, all units will undergo ESS testing, and then Acceptance testing per PR 460.

  13. 46 CFR 57.01-1 - Qualifications and production tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND... regulations in this part shall apply to the qualification of welding procedures, welders, and brazers, and to production tests for all types of manual and machine arc and gas welding and brazing processes. (b) (Modifies...

  14. 46 CFR 57.01-1 - Qualifications and production tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND... regulations in this part shall apply to the qualification of welding procedures, welders, and brazers, and to production tests for all types of manual and machine arc and gas welding and brazing processes. (b) (Modifies...

  15. 46 CFR 57.01-1 - Qualifications and production tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND... regulations in this part shall apply to the qualification of welding procedures, welders, and brazers, and to production tests for all types of manual and machine arc and gas welding and brazing processes. (b) (Modifies...

  16. 46 CFR 57.01-1 - Qualifications and production tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND... regulations in this part shall apply to the qualification of welding procedures, welders, and brazers, and to production tests for all types of manual and machine arc and gas welding and brazing processes. (b) (Modifies...

  17. 46 CFR 57.01-1 - Qualifications and production tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND... regulations in this part shall apply to the qualification of welding procedures, welders, and brazers, and to production tests for all types of manual and machine arc and gas welding and brazing processes. (b) (Modifies...

  18. Light duty utility arm phase 2 qualification test procedure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barnes, G.A.

    1997-01-16

    This Acceptance Test Procedure (ATP) will test and verify that the Exhauster meets the specified functional requirements, safety requirements, operating requirements, and provide a record of the functional test results. The system/functions that will be tested are listed in the scope section of the Acceptance Test Procedure.

  19. Qualification testing and electrical measurement experience: A manufacturer's view

    NASA Astrophysics Data System (ADS)

    Arnett, J. C.; Cooley, J. E.; Wingert, T. L.

    1983-11-01

    ARCO Solar's experiences as a participant in an industry-utility-government environmental qualification team examining photovoltaic devices are discussed. Included is an assessment of the applicability, completeness and appropriateness of the testing procedures and of the acceptance criteria for megawatt-sized procurements for utilities. Like the stand-alone users, the utility industry is interested in obtaining low costs, but additional concerns exist related to reliability and durability, safety, grounding and overall system criteria including performance prediction (related to output power acceptance testing), power quality and dispatchability. For purposes of this first major purchase of photovoltaic modules and panels by the utility industry, there was a carry-over of the JPL specifications. The need exists for futher development, assessement, and selection of qualification and testing standards and evaluation criteria specifically addressing these additional concerns for utility-connected PV power-plant applications.

  20. Qualification testing and electrical measurement experience: A manufacturer's view

    NASA Technical Reports Server (NTRS)

    Arnett, J. C.; Cooley, J. E.; Wingert, T. L.

    1983-01-01

    ARCO Solar's experiences as a participant in an industry-utility-government environmental qualification team examining photovoltaic devices are discussed. Included is an assessment of the applicability, completeness and appropriateness of the testing procedures and of the acceptance criteria for megawatt-sized procurements for utilities. Like the stand-alone users, the utility industry is interested in obtaining low costs, but additional concerns exist related to reliability and durability, safety, grounding and overall system criteria including performance prediction (related to output power acceptance testing), power quality and dispatchability. For purposes of this first major purchase of photovoltaic modules and panels by the utility industry, there was a carry-over of the JPL specifications. The need exists for futher development, assessement, and selection of qualification and testing standards and evaluation criteria specifically addressing these additional concerns for utility-connected PV power-plant applications.

  1. Qualification tests for {sup 192}Ir sealed sources

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Iancso, Georgeta, E-mail: georgetaiancso@yahoo.com; Iliescu, Elena, E-mail: georgetaiancso@yahoo.com; Iancu, Rodica, E-mail: georgetaiancso@yahoo.com

    This paper describes the results of qualification tests for {sup 192}Ir sealed sources, available in Testing and Nuclear Expertise Laboratory of National Institute for Physics and Nuclear Engineering 'Horia Hulubei' (I.F.I.N.-HH), Romania. These sources had to be produced in I.F.I.N.-HH and were tested in order to obtain the authorization from The National Commission for Nuclear Activities Control (CNCAN). The sources are used for gammagraphy procedures or in gammadefectoscopy equipments. Tests, measurement methods and equipments used, comply with CNCAN, AIEA and International Quality Standards and regulations. The qualification tests are: 1. Radiological tests and measurements: dose equivalent rate at 1 m;more » tightness; dose equivalent rate at the surface of the transport and storage container; external unfixed contamination of the container surface. 2. Mechanical and climatic tests: thermal shock; external pressure; mechanic shock; vibrations; boring; thermal conditions for storage and transportation. Passing all tests, it was obtained the Radiological Security Authorization for producing the {sup 192}Ir sealed sources. Now IFIN-HH can meet many demands for this sealed sources, as the only manufacturer in Romania.« less

  2. 16 CFR 1210.14 - Qualification testing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Qualification testing. 1210.14 Section 1210.14 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS SAFETY STANDARD FOR CIGARETTE LIGHTERS Certification Requirements § 1210.14 Qualification testing. (a...

  3. 16 CFR 1209.34 - Qualification testing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....34 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM SAFETY STANDARD FOR CELLULOSE INSULATION Certification § 1209.34 Qualification testing. (a... labelers, or importers may select samples for qualification testing of a product in any manner they desire. ...

  4. Structural Qualification Testing of the WindSat Payload Using Sine Bursts Near Structural Resonance

    NASA Technical Reports Server (NTRS)

    Pontius, Jim; Barnes, Donald; Broduer, Steve (Technical Monitor)

    2001-01-01

    Sine burst tests are often used for structural qualification of space flight hardware. In most instances, the driving frequency of the shaker is specified far below the structure's first resonant mode, such that the entire test article sees uniform acceleration. For large structures, this limits qualification testing to lower parts of the structure, or else it over-tests the lower structure to achieve qualification of the upper structure. The WindSat payload, a 10.5 foot tall graphite/epoxy, titanium, and aluminum radiometer, experiences accelerations at the six foot diameter reflector nearly four times that at the spacecraft interface. Due to size of the payload, the number of bonded joints, and the lightweight reflector support structure design and construction, using static pull testing to qualify all of the bonded joints in the upper structure would result in large, expensive, and extensive test fixturing. Sine burst testing near the first two structural resonant modes was performed on the WindSat payload to achieve the correct load factor distribution up the stack for structural qualification. In this presentation, how finite element method (FEM) sine burst predictions were used in conjunction with low level random and sine burst tests to achieve correct qualification test load factor distribution on the WindSat payload is discussed. Also presented is the risk mitigation approach for using the uncorrelated FEM in this procedure.

  5. Qualification of safety-related electrical equipment in France. Methods, approach and test facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Raimondo, E.; Capman, J.L.; Herovard, M.

    1985-05-01

    Requirements for qualification of electrical equipment used in French-built nuclear power plants are stated in a national code, the RCC-E, or Regles de Construction et de Conception des Materiels Electriques. Under the RCC-E, safety related equipment is assigned to one of three different categories, according to location in the plant and anticipated normal, accident and post-accident behavior. Qualification tests differ for each category and procedures range in scope from the standard seismic test to the highly stringent VISA program, which specifies a predetermined sequence of aging, radiation, seismic and simulated accident testing. A network of official French test facilities wasmore » developed specifically to meet RCC-E requirements.« less

  6. 42 CFR 493.1423 - Standard; Testing personnel qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 5 2013-10-01 2013-10-01 false Standard; Testing personnel qualifications. 493... Testing Laboratories Performing Moderate Complexity Testing § 493.1423 Standard; Testing personnel qualifications. Each individual performing moderate complexity testing must— (a) Possess a current license issued...

  7. 42 CFR 493.1423 - Standard; Testing personnel qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Standard; Testing personnel qualifications. 493... Testing Laboratories Performing Moderate Complexity Testing § 493.1423 Standard; Testing personnel qualifications. Each individual performing moderate complexity testing must— (a) Possess a current license issued...

  8. 42 CFR 493.1423 - Standard; Testing personnel qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 5 2014-10-01 2014-10-01 false Standard; Testing personnel qualifications. 493... Testing Laboratories Performing Moderate Complexity Testing § 493.1423 Standard; Testing personnel qualifications. Each individual performing moderate complexity testing must— (a) Possess a current license issued...

  9. 42 CFR 493.1423 - Standard; Testing personnel qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 5 2012-10-01 2012-10-01 false Standard; Testing personnel qualifications. 493... Testing Laboratories Performing Moderate Complexity Testing § 493.1423 Standard; Testing personnel qualifications. Each individual performing moderate complexity testing must— (a) Possess a current license issued...

  10. 16 CFR § 1210.14 - Qualification testing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Qualification testing. § 1210.14 Section § 1210.14 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS SAFETY STANDARD FOR CIGARETTE LIGHTERS Certification Requirements § 1210.14 Qualification testing. (a...

  11. 48 CFR 34.103 - Testing and qualification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Developed Under Title III, Defense Production Act 34.103 Testing and qualification. (a) Contractors... or item of supply; and (2) for major systems in production, remaining quantities to be acquired are sufficient to justify incurring the cost of testing and qualification. In evaluating this request, the...

  12. M-52 spray booth qualification test

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The procedures, performance, and results obtained from the M-52 spray booth qualification test are documented. The test was conducted at Thiokol Corporation, Space Operations, M-52 Inert Parts Preparation facility. The purpose of this testing sequence was to ensure the spray booth would produce flight qualified hardware. The testing sequence was conducted in two series. The first series was conducted under CTP-0142, Revision 1. The second series was conducted in accordance with CTP-0142, Revision 2. The test sequence started with CTP-0142, Revision 1. The series consisted of the contamination removal test and the performance test. The contamination removal test was used to assess the Teflon level in the spray booth. The performance test consisted of painting and Chemloking a forward dome inside the spray booth per flight procedures. During the performance test, two sets of witness panels (case/insulation and steel/epoxy/steel) were prepared and pull tested. The CTP-0142, Revision 2, series of testing consisted of re-testing the steel/epoxy/steel witness panels. The pull tests analysis indicates the results of the tensile tests were comparable to the systems tunnel witness panel database. The exposed panel set and the control panel set average tensile values were above the 1-basis lower limits established on the systems tunnel witness panel database. It is recommended that the M-52 spray booth be qualified for producing flight hardware.

  13. 49 CFR 213.345 - Vehicle qualification testing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Vehicle qualification testing. 213.345 Section 213... Higher § 213.345 Vehicle qualification testing. (a) All rolling stock types which operate at Class 6... demonstrate that the vehicle dynamic response to track alinement and geometry variations are within acceptable...

  14. Rail vehicle qualification test compendium.

    DOT National Transportation Integrated Search

    2015-02-01

    Qualification and acceptance testing and analysis for new passenger rail vehicles for transit systems has been specified by the transit/commuter agency for which the cars will be supplied to and/or by government agencies. Regulatory testing defined b...

  15. Qualification Lab Testing on M1 Abrams Engine Oil Filters

    DTIC Science & Technology

    2016-11-01

    UNCLASSIFIED QUALIFICATION LAB TESTING ON M1 ABRAMS ENGINE OIL FILTERS FINAL REPORT TFLRF No. 483 by Kristi K. Rutta U.S...the originator. UNCLASSIFIED QUALIFICATION LAB TESTING ON M1 ABRAMS ENGINE OIL FILTERS FINAL REPORT TFLRF No. 483 by Kristi K...TITLE AND SUBTITLE Qualification Lab Testing on M1 Abrams Engine Oil Filter 5a. CONTRACT NUMBER W56HZV-15-C-0030 5b. GRANT NUMBER 5c. PROGRAM

  16. 46 CFR 54.05-15 - Weldment toughness tests-procedure qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Plate for which Charpy V-notch impact testing is required in the parent material and for which V-notch minima are specified shall similarly have welding procedures qualified for toughness by Charpy V-notch testing. For these tests, the test plates shall be oriented with their final rolling direction parallel to...

  17. 49 CFR 178.33b-7 - Design qualification test.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., each new design must be drop tested as follows: Three groups of twenty-five filled containers must be... 49 Transportation 2 2010-10-01 2010-10-01 false Design qualification test. 178.33b-7 Section 178... PACKAGINGS Specifications for Inside Containers, and Linings § 178.33b-7 Design qualification test. (a) Drop...

  18. Qualification Procedures for VHSIC/VLSI

    DTIC Science & Technology

    1990-12-01

    alternative approach for qualification of complex microcircuits. To address the technical issues related to a process oriented qualification approach, the...methodology of microcircuit process control to promote the United States to a position of supplying the nighest quality and most reliable...available resources . o Coordinate document reviews with weekly and monthly status reviews on progress. o Summarize results and collate into four basic

  19. 49 CFR 178.33b-7 - Design qualification test.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Design qualification test. 178.33b-7 Section 178... Specifications for Inside Containers, and Linings § 178.33b-7 Design qualification test. (a) Drop testing. (1) To ensure that creep does not affect the ability of the container to retain the contents, each new design...

  20. Designated Airworthiness Representatives Qualification Criteria, Selection, and Appointment Procedures -- FAA Order 8000.62

    DOT National Transportation Integrated Search

    1985-10-01

    This order contains qualification criteria and procedures for the selection and appointment of Designated Airworthiness Representatives (DAR's) to perform certain certification functions as representatives of the Administrator.

  1. 16 CFR 1212.14 - Qualification testing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Qualification testing. 1212.14 Section 1212.14 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS...) Testing. Before any manufacturer or importer of multi-purpose lighters distributes multi-purpose lighters...

  2. Payload test philosophy. [JPL views on qualification/acceptance testing

    NASA Technical Reports Server (NTRS)

    Gindorf, T.

    1979-01-01

    The general philosophy of how JPL views payload qualification/acceptance testing for programs that are done either in-house or by contractors is described. Particular attention is given to mission risk classifications, preliminary critical design reviews, environmental design requirements, the thermal and dynamics development tests, and the flight spacecraft system test.

  3. 29 CFR 1630.10 - Qualification standards, tests, and other selection criteria.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... business necessity. (b) Qualification standards and tests related to uncorrected vision. Notwithstanding..., or other selection criteria based on an individual's uncorrected vision unless the standard, test, or... application of a qualification standard, test, or other criterion based on uncorrected vision need not be a...

  4. 78 FR 67206 - Qualification Tests for Safety-Related Actuators in Nuclear Power Plants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0079] Qualification Tests for Safety-Related Actuators in..., ``Qualification Tests for Safety-Related Actuators in Nuclear Power Plants.'' This RG is being revised to provide... power plants. This RG is proposed Revision 1 of RG 1.73, ``Qualification Tests of Electric Valve...

  5. 16 CFR 1204.15 - Qualification testing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Qualification testing. 1204.15 Section 1204.15 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS SAFETY STANDARD FOR OMNIDIRECTIONAL CITIZENS BAND BASE STATION ANTENNAS Certification § 1204.15...

  6. 16 CFR 1210.14 - Qualification testing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....14 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS SAFETY STANDARD FOR CIGARETTE LIGHTERS Certification Requirements § 1210.14 Qualification testing. (a... accordance with § 1210.4. (b) Product modifications. If any changes are made to a product after initial...

  7. An automated qualification framework for the MeerKAT CAM (Control-And-Monitoring)

    NASA Astrophysics Data System (ADS)

    van den Heever, Lize; Marais, Neilen; Slabber, Martin

    2016-08-01

    This paper introduces and discusses the design of an Automated Qualification Framework (AQF) that was developed to automate as much as possible of the formal Qualification Testing of the Control And Monitoring (CAM) subsystem of the 64 dish MeerKAT radio telescope currently under construction in the Karoo region of South Africa. The AQF allows each Integrated CAM Test to reference the MeerKAT CAM requirement and associated verification requirement it covers and automatically produces the Qualification Test Procedure and Qualification Test Report from the test steps and evaluation steps annotated in the Integrated CAM Tests. The MeerKAT System Engineers are extremely happy with the AQF results, but mostly by the approach and process it enforces.

  8. Fatigue qualification of high thickness composite rotor components

    NASA Astrophysics Data System (ADS)

    Raggi, M.; Mariani, U.; Zaffaroni, G.

    Fatigue qualification aspects of composite rotor components are presented according with the safe life procedure usually applied by helicopter manufacturers. Test activities are identified at three levels of specimen complexity: coupon, structural element and full scale component. Particular attention is given to high thickness laminates qualification as far as environmental exposure is concerned. A practical approach for an accelerated conditioning procedure is described. The application to a main rotor tension link is presented showing the negligible effect of the moisture absorption on its fatigue strength.

  9. Qualification testing of solar photovoltaic powered refrigerator freezers for medical use in remote geographic locations

    NASA Astrophysics Data System (ADS)

    Kaszeta, W. J.

    1982-12-01

    One of the primary obstacles to the application of vaccination in developing countries is the lack of refrigerated storage. Vaccines exposed to elevated temperatures suffer a permanent loss of potency. Photovoltaic (PV) powered refrigerator/freezer (R/F) units could surmount the problem of refrigeration in remote areas where no reliable commercial power supply is available. The performance measurements of two different models of PV powered R/F units for medical use are presented. Qualification testing consisted of four major procedures: no-load pull down, ice making, steady-state (maintenance), and holdover. Both R/F units met the major World Health Organization (WHO) requirements. However, the testing performed does not provide complete characterization of the two units; such information could be derived only from further extensive test procedures.

  10. Qualification testing of solar photovoltaic powered refrigerator freezers for medical use in remote geographic locations

    NASA Technical Reports Server (NTRS)

    Kaszeta, W. J.

    1982-01-01

    One of the primary obstacles to the application of vaccination in developing countries is the lack of refrigerated storage. Vaccines exposed to elevated temperatures suffer a permanent loss of potency. Photovoltaic (PV) powered refrigerator/freezer (R/F) units could surmount the problem of refrigeration in remote areas where no reliable commercial power supply is available. The performance measurements of two different models of PV powered R/F units for medical use are presented. Qualification testing consisted of four major procedures: no-load pull down, ice making, steady-state (maintenance), and holdover. Both R/F units met the major World Health Organization (WHO) requirements. However, the testing performed does not provide complete characterization of the two units; such information could be derived only from further extensive test procedures.

  11. WTP Waste Feed Qualification: Glass Fabrication Unit Operation Testing Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stone, M. E.; Newell, J. D.; Johnson, F. C.

    The waste feed qualification program is being developed to protect the Hanford Tank Waste Treatment and Immobilization Plant (WTP) design, safety basis, and technical basis by assuring waste acceptance requirements are met for each staged waste feed campaign prior to transfer from the Tank Operations Contractor to the feed receipt vessels inside the Pretreatment Facility. The Waste Feed Qualification Program Plan describes the three components of waste feed qualification: 1. Demonstrate compliance with the waste acceptance criteria 2. Determine waste processability 3. Test unit operations at laboratory scale. The glass fabrication unit operation is the final step in the processmore » demonstration portion of the waste feed qualification process. This unit operation generally consists of combining each of the waste feed streams (high-level waste (HLW) and low-activity waste (LAW)) with Glass Forming Chemicals (GFCs), fabricating glass coupons, performing chemical composition analysis before and after glass fabrication, measuring hydrogen generation rate either before or after glass former addition, measuring rheological properties before and after glass former addition, and visual observation of the resulting glass coupons. Critical aspects of this unit operation are mixing and sampling of the waste and melter feeds to ensure representative samples are obtained as well as ensuring the fabrication process for the glass coupon is adequate. Testing was performed using a range of simulants (LAW and HLW simulants), and these simulants were mixed with high and low bounding amounts of GFCs to evaluate the mixing, sampling, and glass preparation steps in shielded cells using laboratory techniques. The tests were performed with off-the-shelf equipment at the Savannah River National Laboratory (SRNL) that is similar to equipment used in the SRNL work during qualification of waste feed for the Defense Waste Processing Facility (DWPF) and other waste treatment facilities at

  12. Proposed acceptance, qualification, and characterization tests for thin-film PV modules

    NASA Technical Reports Server (NTRS)

    Waddington, D.; Mrig, L.; Deblasio, R.; Ross, R.

    1988-01-01

    Details of a proposed test program for PV thin-film modules which the Department of Energy has directed the Solar Energy Research Institute (SERI) to prepare are presented. Results of one of the characterization tests that SERI has performed are also presented. The objective is to establish a common approach to testing modules that will be acceptable to both users and manufacturers. The tests include acceptance, qualification, and characterization tests. Acceptance tests verify that randomly selected modules have similar characteristics. Qualification tests are based on accelerated test methods designed to simulate adverse conditions. Characterization tests provide data on performance in a predefined environment.

  13. 24 CFR 200.935 - Administrator qualifications and procedures for HUD building products certification programs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Administrator qualifications and procedures for HUD building products certification programs. 200.935 Section 200.935 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY...

  14. SP-100 flight qualification testing assessment

    NASA Technical Reports Server (NTRS)

    Jeanmougin, Nanette M.; Moore, Roger M.; Wait, David L.; Jacox, Michael G.

    1988-01-01

    The SP-100 is a compact space power system driven by a nuclear reactor that provides 100 kWe to the user at 200 VDC. The thermal energy generated by the nuclear reactor is converted into electrical energy by passive thermoelectric devices. Various options for tailoring the MIL-STD-1540B guidelines to the SP-100 nuclear power system are discussed. This study aids in selecting the appropriate qualification test program based on the cost, schedule, and test effectiveness of the various options.

  15. 78 FR 25488 - Qualification Tests for Safety-Related Actuators in Nuclear Power Plants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0079] Qualification Tests for Safety-Related Actuators in... regulatory guide (DG), DG-1235, ``Qualification Tests for Safety-Related Actuators in Nuclear Power Plants...-251- 7495, email: [email protected] . Both of the Office of Nuclear Regulatory Research, U.S. Nuclear...

  16. Qualification testing of flat-plate photovoltaic modules

    NASA Technical Reports Server (NTRS)

    Hoffman, A. R.; Griffith, J. S.; Ross, R. G., Jr.

    1982-01-01

    The placement of photovoltaic modules in various applications, in climates and locations throughout the world, results in different degrees and combinations of environmental and electrical stress. Early detection of module reliability deficiencies via laboratory testing is necessary for achieving long, satisfactory field service. This overview paper describes qualification testing techniques being used in the US Department of Energy's flat-plate terrestrial photovoltaic development program in terms of their significance, rationale for specified levels and durations, and test results.

  17. Development of a qualification standard for adhesives used in hybrid microcircuits

    NASA Technical Reports Server (NTRS)

    Licari, J. J.; Weigand, B. L.; Soykin, C. A.

    1981-01-01

    Improved qualification standards and test procedures for adhesives used in microelectronic packaging are developed. The test methods in specification for the Selection and Use of Organic Adhesives in Hybrid Microcircuits are reevaluated versus industry and government requirements. Four electrically insulative and four electrically conductive adhesives used in the assembly of hybrid microcircuits are selected to evaluate the proposed revised test methods. An estimate of the cost to perform qualification testing of an adhesive to the requirements of the revised specification is also prepared.

  18. APA's Guidelines for Test User Qualifications: An Executive Summary.

    ERIC Educational Resources Information Center

    Turner, Samuel M.; DeMers, Stephen T.; Fox, Heather Roberts; Reed, Geoffrey M.

    2001-01-01

    Describes the American Psychological Association's (APA's) development of the Task Force on Test User Qualifications, explaining the APA's purpose in developing guidelines for the use of psychological tests. Highlights the historical background, the scope of the guidelines, generic knowledge and skills considered important for good test use, and…

  19. Qualification test procedures and results for Honeywell solar collector subsystem, single-family residence

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The test procedures and results in qualifying the Honeywell single family residence solar collector subsystem are presented. Testing was done in the following areas: pressure, service loads, hail, solar degradation, pollutants, thermal degradation, and outgassing.

  20. The BepiColombo Spacecraft: The Mercury Transfer Module Structure Qualification Test Campaign Description

    NASA Astrophysics Data System (ADS)

    Martin Zurdo, M. J.

    2012-07-01

    The BepiColombo is a space mission to Mercury (ESA in cooperation with Japan Aerospace Exploration Agency). The spacecraft consist of three different structures: two orbiters responsible for the scientific mission (MPO and MMO) and one service module, Mercury Transfer Module (MTM), which provides propulsion and services during the journey to Mercury. Taking into account only the MTM structure, the companies involved are ASTRIUM GERMANY acting as the prime contractor and ASTRIUM UK acting as the co- prime contractor company. EADS CASA Espacio (ECE) in Spain is the company responsible for the final design, manufacturing and qualification of the MTM structure. The test campaign specimen is the MTM core structure, which corresponds to the central cone with the structure floors, shear panels and tank support structure. This test campaign qualifies the primary load path and its primary interfaces; the rest of the MTM structure is qualified by system level vibration test. In order to qualify the MTM structure, three different kinds of qualification tests have been performed: stiffness test, global strength test and local tests in different specific areas. The most relevant test during the campaign is the global strength test case, in which several external loads are introduced (different interfaces) simulating the load introduction for a selected critical flight case. There are two important items in the qualification test campaign: 1. The instrumentation of the structure, with two main functions: to control the specimen under test loads, and to demonstrate the qualification of the structure. 2. The set-up structure, designed by ECE to allow the correct load introduction on each testing case during the whole test campaign. This paper describes the MTM structure test campaign from the definition of the loads applied in each test to the qualification of the complete structure.

  1. Issues Related to Large Flight Hardware Acoustic Qualification Testing

    NASA Technical Reports Server (NTRS)

    Kolaini, Ali R.; Perry, Douglas C.; Kern, Dennis L.

    2011-01-01

    The characteristics of acoustical testing volumes generated by reverberant chambers or a circle of loudspeakers with and without large flight hardware within the testing volume are significantly different. The parameters attributing to these differences are normally not accounted for through analysis or acoustic tests prior to the qualification testing without the test hardware present. In most cases the control microphones are kept at least 2-ft away from hardware surfaces, chamber walls, and speaker surfaces to minimize the impact of the hardware in controlling the sound field. However, the acoustic absorption and radiation of sound by hardware surfaces may significantly alter the sound pressure field controlled within the chamber/speaker volume to a given specification. These parameters often result in an acoustic field that may provide under/over testing scenarios for flight hardware. In this paper the acoustic absorption by hardware surfaces will be discussed in some detail. A simple model is provided to account for some of the observations made from Mars Science Laboratory spacecraft that recently underwent acoustic qualification tests in a reverberant chamber.

  2. Qualification and Flight Test of Non-Chrome Primers for C-130 Aircraft

    DTIC Science & Technology

    2011-08-17

    system  Significant hexavalent chrome reduction in finish system  Potential exposure level of spray applied chromated conversion coating not as...Lockheed Martin Aeronautics Company Qualification and Flight Test of Non- Chrome Primers for C-130 Aircraft Scott Jones Lockheed Martin...00-2011 to 00-00-2011 4. TITLE AND SUBTITLE Qualification and Flight Test of Non- Chrome Primers for C-130 Aircraft 5a. CONTRACT NUMBER 5b. GRANT

  3. 42 CFR 493.1357 - Standard; laboratory director qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Standard; laboratory director qualifications. 493... HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION LABORATORY REQUIREMENTS Personnel for Nonwaived Testing Laboratories Performing Provider-Performed Microscopy (ppm) Procedures § 493.1357 Standard...

  4. 42 CFR 493.1357 - Standard; laboratory director qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Standard; laboratory director qualifications. 493... HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION LABORATORY REQUIREMENTS Personnel for Nonwaived Testing Laboratories Performing Provider-Performed Microscopy (ppm) Procedures § 493.1357 Standard...

  5. REPORT OF THE QUALIFICATION TESTING OF SNAP 10A FUSISTORS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holtwick, J.S. III; Nowell, V.P.

    1963-07-31

    Qualification testing of SNAP 10A fusistors was performed. Test operations included: visual inspection, insulation resistance, dielectric strength, and d-c resistance testing prior to subjecting the fusisters to environmental testing; opening-time testing prior to, during, and following vacuum and temperature testing; and insulation resistance, dielectric strength, and d-c resistance testing following environmental applications of temperature, vacuum, and sinusoidal vibration. (auth)

  6. Qualification test and analysis report: Solar collectors

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Test results show that the Owens-Illinois Sunpak TM Model SEC 601 air-cooled collector meets the national standards and codes as defined in the Subsystem Peformance Specification and Verification Plan of NASA/MSFC, dated October 28, 1976. The program calls for the development, fabrication, qualification and delivery of an air-cooled solar collector for solar heating, combined heating and cooling, and/or hot water systems.

  7. Qualification test unit slide stainer (Beckman P/N 673753)

    NASA Technical Reports Server (NTRS)

    Bernier, P. S.

    1972-01-01

    Specifications for a slide stainer unit for the Skylab program are presented. The qualification test slide stainer was designed to be a self-contained system capable of performing an eight-step Gram stain of microorganisms and a Wright's stain of blood smears.

  8. Environmental testing of block 3 solar cell modules. Part 1: Qualification testing of standard production modules

    NASA Technical Reports Server (NTRS)

    Griffith, J. S.

    1979-01-01

    Qualification tests of solar cell modules are described. These modules continue to show improvement over earlier type modules tested. Cell cracking and delamination are less prevalent, and interconnect problems and electrical degradation from environmental testing are now rare.

  9. Process qualification and testing of LENS deposited AY1E0125 D-bottle brackets.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Atwood, Clinton J.; Smugeresky, John E.; Jew, Michael

    2006-11-01

    The LENS Qualification team had the goal of performing a process qualification for the Laser Engineered Net Shaping{trademark}(LENS{reg_sign}) process. Process Qualification requires that a part be selected for process demonstration. The AY1E0125 D-Bottle Bracket from the W80-3 was selected for this work. The repeatability of the LENS process was baselined to determine process parameters. Six D-Bottle brackets were deposited using LENS, machined to final dimensions, and tested in comparison to conventionally processed brackets. The tests, taken from ES1E0003, included a mass analysis and structural dynamic testing including free-free and assembly-level modal tests, and Haversine shock tests. The LENS brackets performedmore » with very similar characteristics to the conventionally processed brackets. Based on the results of the testing, it was concluded that the performance of the brackets made them eligible for parallel path testing in subsystem level tests. The testing results and process rigor qualified the LENS process as detailed in EER200638525A.« less

  10. 49 CFR 178.33b-7 - Design qualification test.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Design qualification test. 178.33b-7 Section 178.33b-7 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR PACKAGINGS Specifications for Inside Containers, and...

  11. 46 CFR 54.20-5 - Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Welding qualification tests and production testing... OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Fabrication by Welding § 54.20-5 Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48). (a...

  12. 46 CFR 54.20-5 - Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Welding qualification tests and production testing... OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Fabrication by Welding § 54.20-5 Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48). (a...

  13. 46 CFR 54.20-5 - Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Welding qualification tests and production testing... OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Fabrication by Welding § 54.20-5 Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48). (a...

  14. 46 CFR 54.20-5 - Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Welding qualification tests and production testing... OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Fabrication by Welding § 54.20-5 Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48). (a...

  15. 46 CFR 54.20-5 - Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Welding qualification tests and production testing... OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Fabrication by Welding § 54.20-5 Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48). (a...

  16. BSA Delta Qualification 2, volume 3, book 1

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This report, presented in three volumes, provides the results of a two-motor Delta Qualification 2 program conducted in 1993 to certify the following enhancements for incorporation into booster separation motor (BSM) flight hardware: vulcanized-in-place nozzle aft closure insulation; new iso-static ATJ bulk graphite throat insert material; adhesive EA 9394 for bonding the nozzle throat, igniter grain rod/centering insert/igniter case; deletion of the igniter adapter insulator ring; deletion of the igniter adapter/igniter case interface RTV; and deletion of Loctite from igniter retainer plate threads. The enhancements above directly resulted from (1) the BSM total quality management (TQM) team initiatives to enhance the BSM producibility, and (2) the necessity to qualify new throat insert and adhesive systems to replace existing materials that will not be available. Testing was completed at both the component and motor levels. Component testing was accomplished to screen candidate materials (e.g., throat materials, adhesive systems) and to optimize processes (e.g., aft closure insulator vulcanization approach) prior to their incorporation into the test motors. Motor tests -- consisting of two motors, randomly selected by USBI's on-site quality personnel from production lot AAY, which were modified to accept the enhancements -- were completed to provide the final qualification of the enhancements for incorporation into flight hardware. Volume 3 book 1 provides supporting documentation to the analyses and plans of testing the two Delta Qualification units including thermal cycling planning/data acceptance records, environmental test procedures and pretest temperature conditioning history, Delta Qualification test plan, and specification SE0837 -- mix acceptance test specification.

  17. 46 CFR 56.70-20 - Qualification, general.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Qualification, general. 56.70-20 Section 56.70-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Fabrication, Assembly and Erection § 56.70-20 Qualification, general. (a) Qualification of the welding procedures to be used, and of the...

  18. 46 CFR 56.70-20 - Qualification, general.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Qualification, general. 56.70-20 Section 56.70-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Fabrication, Assembly and Erection § 56.70-20 Qualification, general. (a) Qualification of the welding procedures to be used, and of the...

  19. 46 CFR 56.70-20 - Qualification, general.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Qualification, general. 56.70-20 Section 56.70-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Fabrication, Assembly and Erection § 56.70-20 Qualification, general. (a) Qualification of the welding procedures to be used, and of the...

  20. 46 CFR 56.70-20 - Qualification, general.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Qualification, general. 56.70-20 Section 56.70-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Fabrication, Assembly and Erection § 56.70-20 Qualification, general. (a) Qualification of the welding procedures to be used, and of the...

  1. 46 CFR 56.70-20 - Qualification, general.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Qualification, general. 56.70-20 Section 56.70-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Fabrication, Assembly and Erection § 56.70-20 Qualification, general. (a) Qualification of the welding procedures to be used, and of the...

  2. 28 CFR 34.109 - Qualifications of peer reviewers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 34.109 Judicial Administration DEPARTMENT OF JUSTICE OJJDP COMPETITION AND PEER REVIEW PROCEDURES Peer Review § 34.109 Qualifications of peer reviewers. The general reviewer qualification criteria to...). Additional details concerning peer reviewer qualifications are provided in the OJJDP “Peer Review Guideline”. ...

  3. Space Qualification Test of a-Silicon Solar Cell Modules

    NASA Technical Reports Server (NTRS)

    Kim, Q.; Lawton, R. A.; Manion, S. J.; Okuno, J. O.; Ruiz, R. P.; Vu, D. T.; Vu, D. T.; Kayali, S. A.; Jeffrey, F. R.

    2004-01-01

    The basic requirements of solar cell modules for space applications are generally described in MIL-S-83576 for the specific needs of the USAF. However, the specifications of solar cells intended for use on space terrestrial applications are not well defined. Therefore, this qualifications test effort was concentrated on critical areas specific to the microseismometer probe which is intended to be included in the Mars microprobe programs. Parameters that were evaluated included performance dependence on: illuminating angles, terrestrial temperatures, lifetime, as well as impact landing conditions. Our qualification efforts were limited to these most critical areas of concern. Most of the tested solar cell modules have met the requirements of the program except the impact tests. Surprisingly, one of the two single PIN 2 x 1 amorphous solar cell modules continued to function even after the 80000G impact tests. The output power parameters, Pout, FF, Isc and Voc, of the single PIN amorphous solar cell module were found to be 3.14 mW, 0.40, 9.98 mA and 0.78 V, respectively. These parameters are good enough to consider the solar module as a possible power source for the microprobe seismometer. Some recommendations were made to improve the usefulness of the amorphous silicon solar cell modules in space terrestrial applications, based on the results obtained from the intensive short term lab test effort.

  4. Development and qualification testing of a laser-ignited, all-secondary (DDT) detonator

    NASA Technical Reports Server (NTRS)

    Blachowski, Thomas J.; Krivitsky, Darrin Z.; Tipton, Stephen

    1994-01-01

    The Indian Head Division, Naval Surface Warfare Center (IHDIV, NSWC) is conducting a qualification program for a laser-ignited, all-secondary (DDT) explosive detonator. This detonator was developed jointly by IHDIV, NSWC and the Department of Energy's EG&G Mound Applied Technologies facility in Miamisburg, Ohio to accept a laser initiation signal and produce a fully developed shock wave output. The detonator performance requirements were established by the on-going IHDIV, NSWC Laser Initiated Transfer Energy Subsystem (LITES) advanced development program. Qualification of the detonator as a component utilizing existing military specifications is the selected approach for this program. The detonator is a deflagration-to-detonator transfer (DDT) device using a secondary explosive, HMX, to generate the required shock wave output. The prototype development and initial system integration tests for the LITES and for the detonator were reported at the 1992 International Pyrotechnics Society Symposium and at the 1992 Survival and Flight Equipment National Symposium. Recent results are presented for the all-fire sensitivity and qualification tests conducted at two different laser initiation pulses.

  5. Infrared Heater Used in Qualification Testing of International Space Station Radiators

    NASA Technical Reports Server (NTRS)

    Ziemke, Robert A.

    2004-01-01

    Two heat rejection radiator systems for the International Space Station (ISS) have undergone thermal vacuum qualification testing at the NASA Glenn Research Center (GRC), Plum Brook Station, Sandusky, Ohio. The testing was performed in the Space Power Facility (SPF), the largest thermal vacuum chamber in the world. The heat rejection system radiator was tested first; it removes heat from the ISS crew living quarters. The second system tested was the photovoltaic radiator (PVR), which rejects heat from the ISS photovoltaic arrays and the electrical power-conditioning equipment. The testing included thermal cycling, hot- and cold-soaked deployments, thermal gradient deployments, verification of the onboard heater controls, and for the PVR, thermal performance tests with ammonia flow. Both radiator systems are orbital replacement units for ease of replacement on the ISS. One key to the success of these tests was the performance of the infrared heater system. It was used in conjunction with a gaseous-nitrogen-cooled cryoshroud in the SPF vacuum chamber to achieve the required thermal vacuum conditions for the qualification tests. The heater, which was designed specifically for these tests, was highly successful and easily met the test requirements. This report discusses the heating requirements, the heater design features, the design approach, and the mathematical basis of the design.

  6. Testing in Support of Space Fission System Development and Qualification

    NASA Technical Reports Server (NTRS)

    Houts, Mike; Bragg-Sitton, Shannon; Garber, Anne; Godfrey, Tom; Martin, Jim; Pearson, Boise; Webster, Kenny

    2007-01-01

    Extensive data would be required for the qualification of a fission surface power (FSP) system. The strategy for qualifying a FSP system could have a significant programmatic impact. This paper explores potential options that could be used for qualifying FSP systems, including cost-effective means for obtaining required data. three methods for obtaining qualification data are analysis, non-nuclear testing, and nuclear testing. It has been over 40 years since the US qualified a space reactor for launch. During that time, advances have been made related to all three methods. Perhaps the greatest advancement has occurred in the area of computational tools for design and analysis. Tools that have been developed, coupled with modem computers, would have a significant impact on a FSP qualification. This would be especially true for systems with materials and fuels operating well within temperature, irradiation damage, and burnup limits. The ability to perform highly realistic non-nuclear testing has also advanced throughout the past four decades. Instrumented thermal simulators were developed during the 1970s and 1980s to assist in the development, operation, and assessment of terrestrial fission systems. Instrumented thermal simulators optimized for assisting in the development, operation, and assessment of modem FSP systems have been under development (and utilized) since 1998. These thermal simulators enable heat from fission to be closely mimicked (axial power profile, radial power profile, temperature, heat flux, etc.} and extensive data to be taken from the core region. Both steady-state and transient operation can be tested. For transient testing, reactivity feedback is calculated (or measured in cold/warm criticals) based on reactor temperature and/or dimensional changes. Pin power during a transient is then calculated based on the reactivity feedback that would occur given measured values of temperature and/or dimensional change. In this way nonnuclear testing

  7. Space Qualification Test of a-Silicon Solar Cell Modules

    NASA Technical Reports Server (NTRS)

    Kim, Q.; Lawton, R. A.; Manion, S. J.; Okuno, J. O.; Ruiz, R. P.; Vu, D. T.; Kayali, S. A.; Jeffrey, F. R.

    1997-01-01

    The basic requirement of solar cell modules for space applications are generally described in MIL-S-83576 for the specific needs of the USAF. However, the specifications of solar cells intended for use on space terrestrial applications are not well defined. Therefore this qualification test effort was concentrated on critical areas specific to the microseismometer probe which is intended to be included in the Mars microprobe programs.

  8. WTP Waste Feed Qualification: Hydrogen Generation Rate Measurement Apparatus Testing Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stone, M. E.; Newell, J. D.; Smith, T. E.

    The generation rate of hydrogen gas in the Hanford tank waste will be measured during the qualification of the staged tank waste for processing in the Hanford Tank Waste Treatment and Immobilization Plant. Based on a review of past practices in measurement of the hydrogen generation, an apparatus to perform this measurement has been designed and tested for use during waste feed qualification. The hydrogen generation rate measurement apparatus (HGRMA) described in this document utilized a 100 milliliter sample in a continuously-purged, continuously-stirred vessel, with measurement of hydrogen concentration in the vent gas. The vessel and lid had a combinedmore » 220 milliliters of headspace. The vent gas system included a small condenser to prevent excessive evaporative losses from the sample during the test, as well as a demister and filter to prevent particle migration from the sample to the gas chromatography system. The gas chromatograph was an on line automated instrument with a large-volume sample-injection system to allow measurement of very low hydrogen concentrations. This instrument automatically sampled the vent gas from the hydrogen generation rate measurement apparatus every five minutes and performed data regression in real time. The fabrication of the hydrogen generation rate measurement apparatus was in accordance with twenty three (23) design requirements documented in the conceptual design package, as well as seven (7) required developmental activities documented in the task plan associated with this work scope. The HGRMA was initially tested for proof of concept with physical simulants, and a remote demonstration of the system was performed in the Savannah River National Laboratory Shielded Cells Mockup Facility. Final verification testing was performed using non-radioactive simulants of the Hanford tank waste. Three different simulants were tested to bound the expected rheological properties expected during waste feed qualification testing

  9. 33 CFR 154.2010 - Qualifications for acceptance as a certifying entity.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... qualifications: (a) The ability to review and evaluate design drawings and failure analyses for compliance to... incorporated by reference; (c) The ability to monitor and evaluate test procedures and results for compliance with the operational requirements of this subpart; (d) The ability to perform inspections and observe...

  10. Qualification test of the Ross Double Planetary Mixer

    NASA Technical Reports Server (NTRS)

    Lueders, Kurt F.

    1993-01-01

    This test report describes the qualification test of the Ross Double Planetary Mixer used to mix room temperature vulcanized (RTV) silicone (Dow Corning 90-006-2) for the redesigned solid rocket motor (RSRM) nozzle joints. Testing was completed 18 June 1993 in the M-113A Nozzle Fabrication Facility at Thiokol Corporation, Space Operations, Brigham City, Utah. The Ross mixer provides better mixing and better control on temperature and humidity, resulting in better quality RTV and a longer usable pot life. The test began on 3 May 1993 and was stopped due to operator error during the tensile strength and elongation testing. Specimens were ruined without gathering any useful data. A 'no test' was declared, the problem was remedied, and the test was re-run with MSFC approval. The test was run and all pass/fail criteria were met, most with a considerable margin. The Ross Double Planetary Mixer met all certification objectives and is recommended for immediate use for mixing RTV silicone for RSRM nozzle joints.

  11. Space flight requirements for fiber optic components: qualification testing and lessons learned

    NASA Astrophysics Data System (ADS)

    Ott, Melanie N.; Jin, Xiaodan Linda; Chuska, Richard; Friedberg, Patricia; Malenab, Mary; Matuszeski, Adam

    2006-04-01

    "Qualification" of fiber optic components holds a very different meaning than it did ten years ago. In the past, qualification meant extensive prolonged testing and screening that led to a programmatic method of reliability assurance. For space flight programs today, the combination of using higher performance commercial technology, with shorter development schedules and tighter mission budgets makes long term testing and reliability characterization unfeasible. In many cases space flight missions will be using technology within years of its development and an example of this is fiber laser technology. Although the technology itself is not a new product the components that comprise a fiber laser system change frequently as processes and packaging changes occur. Once a process or the materials for manufacturing a component change, even the data that existed on its predecessor can no longer provide assurance on the newer version. In order to assure reliability during a space flight mission, the component engineer must understand the requirements of the space flight environment as well as the physics of failure of the components themselves. This can be incorporated into an efficient and effective testing plan that "qualifies" a component to specific criteria defined by the program given the mission requirements and the component limitations. This requires interaction at the very initial stages of design between the system design engineer, mechanical engineer, subsystem engineer and the component hardware engineer. Although this is the desired interaction what typically occurs is that the subsystem engineer asks the components or development engineers to meet difficult requirements without knowledge of the current industry situation or the lack of qualification data. This is then passed on to the vendor who can provide little help with such a harsh set of requirements due to high cost of testing for space flight environments. This presentation is designed to guide the

  12. Space Flight Requirements for Fiber Optic Components; Qualification Testing and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Ott, Melanie N.; Jin, Xiaodan Linda; Chuska, Richard; Friedberg, Patricia; Malenab, Mary; Matuszeski, Adam

    2007-01-01

    "Qualification" of fiber optic components holds a very different meaning than it did ten years ago. In the past, qualification meant extensive prolonged testing and screening that led to a programmatic method of reliability assurance. For space flight programs today, the combination of using higher performance commercial technology, with shorter development schedules and tighter mission budgets makes long term testing and reliability characterization unfeasible. In many cases space flight missions will be using technology within years of its development and an example of this is fiber laser technology. Although the technology itself is not a new product the components that comprise a fiber laser system change frequently as processes and packaging changes occur. Once a process or the materials for manufacturing a component change, even the data that existed on its predecessor can no longer provide assurance on the newer version. In order to assure reliability during a space flight mission, the component engineer must understand the requirements of the space flight environment as well as the physics of failure of the components themselves. This can be incorporated into an efficient and effective testing plan that "qualifies" a component to specific criteria defined by the program given the mission requirements and the component limitations. This requires interaction at the very initial stages of design between the system design engineer, mechanical engineer, subsystem engineer and the component hardware engineer. Although this is the desired interaction what typically occurs is that the subsystem engineer asks the components or development engineers to meet difficult requirements without knowledge of the current industry situation or the lack of qualification data. This is then passed on to the vendor who can provide little help with such a harsh set of requirements due to high cost of testing for space flight environments. This presentation is designed to guide the

  13. 49 CFR 240.405 - Processing qualification review petitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Processing qualification review petitions. 240.405... Resolution Procedures § 240.405 Processing qualification review petitions. (a) Each petition shall be acknowledged in writing by FRA. The acknowledgment shall contain the docket number assigned to the petition and...

  14. Testing in Support of Fission Surface Power System Qualification

    NASA Technical Reports Server (NTRS)

    Houts, Mike; Bragg-Sitton, Shannon; Godfroy, Tom; Martin, Jim; Pearson, Boise; VanDyke, Melissa

    2007-01-01

    The strategy for qualifying a FSP system could have a significant programmatic impact. The US has not qualified a space fission power system since launch of the SNAP-10A in 1965. This paper explores cost-effective options for obtaining data that would be needed for flight qualification of a fission system. Qualification data could be obtained from both nuclear and non-nuclear testing. The ability to perform highly realistic nonnuclear testing has advanced significantly throughout the past four decades. Instrumented thermal simulators were developed during the 1970s and 1980s to assist in the development, operation, and assessment of terrestrial fission systems. Instrumented thermal simulators optimized for assisting in the development, operation, and assessment of modern FSP systems have been under development (and utilized) since 1998. These thermal simulators enable heat from fission to be closely mimicked (axial power profile, radial power profile, temperature, heat flux, etc.) and extensive data to be taken from the core region. For transient testing, pin power during a transient is calculated based on the reactivity feedback that would occur given measured values of test article temperature and/or dimensional changes. The reactivity feedback coefficients needed for the test are either calculated or measured using cold/warm zero-power criticals. In this way non-nuclear testing can be used to provide very realistic information related to nuclear operation. Non-nuclear testing can be used at all levels, including component, subsystem, and integrated system testing. FSP fuels and materials are typically chosen to ensure very high confidence in operation at design burnups, fluences, and temperatures. However, facilities exist (e.g. ATR, HFIR) for affordably performing in-pile fuel and materials irradiations, if such testing is desired. Ex-core materials and components (such as alternator materials, control drum drives, etc.) could be irradiated in university or DOE

  15. Use of proficiency test performance to determine clinical laboratory director qualifications.

    PubMed

    Howanitz, P J

    1988-04-01

    Many activities and policies influence laboratory test quality. Proficiency test results are one measure of laboratory quality, and during the past 25 years, five studies have examined the relationship of laboratory director educational requirements to proficiency test results. Data from three studies support the association between director qualifications and quality as measured by proficiency test performance, whereas no relationship was found in the other two studies. Possible reasons for conflicting results include differences in database size and demographics; in addition, proficiency test results may be inappropriate, although widely used, as the sole measure of laboratory director performance.

  16. The European Medicines Agency experience with biomarker qualification.

    PubMed

    Manolis, Efthymios; Koch, Armin; Deforce, Dieter; Vamvakas, Spiros

    2015-01-01

    Since the launch of the qualification process in 2009, the CHMP reviewed/is reviewing 48 requests for qualification advice or opinion (as of Sept 2013) related to biomarkers (BM) or other novel drug development tools (e.g. patient reported outcome measures, modeling, and statistical methods). The qualification opinions are available on the EMA website (Qualification of novel methodologies for medicine development, http://www.ema.europa.eu/ema/index.jsp?curl=pages/regulation/document_listing/document_listing_000319.jsp&mid=WC0b01ac0580022bb0#section2 , 2013). Also there is a trend of increasing numbers of qualification requests to CHMP, indicative of the pace that targeted drug development and personalized medicine is gaining and the need to bring the new tools from research to drug development and clinical use. This chapter will focus on the regulatory experience gained so far from the CHMP qualification procedure. Basic qualification principles will be presented. Through qualification examples, we will elaborate on common grounds and divergences between the different stakeholders.

  17. Qualification flight tests of the Viking decelerator system.

    NASA Technical Reports Server (NTRS)

    Moog, R. D.; Bendura, R. J.; Timmons, J. D.; Lau, R. A.

    1973-01-01

    The Balloon Launched Decelerator Test (BLDT) series conducted at White Sands Missile Range (WSMR) during July and August of 1972 flight qualified the NASA Viking '75 decelerator system at conditions bracketing those expected for Mars. This paper discusses the decelerator system design requiremnts, compares the test results with prior work, and discusses significant considerations leading to successful qualification in earth's atmosphere. The Viking decelerator system consists of a single-stage mortar-deployed 53-foot nominal diameter disk-gap-band parachute. Full-scale parachutes were deployed behind a full-scale simulated Viking vehicle at Mach numbers from 0.47 to 2.18 and dynamic pressures from 6.9 to 14.6 psf. Analyses show that the system is qualified with sufficient margin to perform successfully for the Viking mission.

  18. Project FIRES. Volume 4: Prototype Protective Ensemble Qualification Test Report, Phase 1B

    NASA Technical Reports Server (NTRS)

    Abeles, F. J.

    1980-01-01

    The qualification testing of a prototype firefighter's protective ensemble is documented. Included are descriptions of the design requirements, the testing methods, and the test apparatus. The tests include measurements of individual subsystem characteristics in areas relating to both physical testing, such as heat, flame, impact penetration and human factors testing, such as dexterity, grip, and mobility. Also, measurements related to both physical and human factors testing of the complete ensemble, such as water protection, metabolic expenditures, and compatibility are considered.

  19. Unintended Consequences: How Qualification Constrains Innovation

    NASA Technical Reports Server (NTRS)

    Brice, Craig A.

    2011-01-01

    The development and implementation of new materials and manufacturing processes for aerospace application is often hindered by the high cost and long time span associated with current qualification procedures. The data requirements necessary for material and process qualification are extensive and often require millions of dollars and multiple years to complete. Furthermore, these qualification data can become obsolete for even minor changes to the processing route. This burden is a serious impediment to the pursuit of revolutionary new materials and more affordable processing methods for air vehicle structures. The application of integrated computational materials engineering methods to this problem can help to reduce the barriers to rapid insertion of new materials and processes. By establishing predictive capability for the development of microstructural features in relation to processing and relating this to critical property characteristics, a streamlined approach to qualification is possible. This paper critically examines the advantages and challenges to a modeling-assisted qualification approach for aerospace structural materials. An example of how this approach might apply towards the emerging field of additive manufacturing is discussed in detail.

  20. Qualification Tests of Micro-camera Modules for Space Applications

    NASA Astrophysics Data System (ADS)

    Kimura, Shinichi; Miyasaka, Akira

    Visual capability is very important for space-based activities, for which small, low-cost space cameras are desired. Although cameras for terrestrial applications are continually being improved, little progress has been made on cameras used in space, which must be extremely robust to withstand harsh environments. This study focuses on commercial off-the-shelf (COTS) CMOS digital cameras because they are very small and are based on an established mass-market technology. Radiation and ultrahigh-vacuum tests were conducted on a small COTS camera that weighs less than 100 mg (including optics). This paper presents the results of the qualification tests for COTS cameras and for a small, low-cost COTS-based space camera.

  1. Design, fabrication, test qualification and price analysis of a third generation solar cell module

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The design, fabrication, test, and qualification of a third generation intermediate load solar cell module are presented. A technical discussion of the detailed module design, preliminary design review, design modifications, and environmental testing are included. A standardized pricing system is utilized to establish the cost competitiveness of this module design.

  2. Trial-Run of a Junction-Box Attachment Test for Use in Photovoltaic Module Qualification: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, D. C.; Deibert, S. L.; Wohlgemuth, J. H.

    Engineering robust adhesion of the junction box (j-box) is a hurdle typically encountered by photovoltaic module manufacturers during product development and manufacturing process control. There are historical incidences of adverse effects (e.g., fires) caused when the j-box/adhesive/module system has failed in the field. The addition of a weight to the j-box during the 'damp-heat,' 'thermal-cycle,' or 'creep' tests within the IEC qualification protocol is proposed to verify the basic robustness of the adhesion system. The details of the proposed test are described, in addition to a trial-run of the test procedure. The described experiments examine four moisture-cured silicones, four foammore » tapes, and a hot-melt adhesive used in conjunction with glass, KPE, THV, and TPE substrates. For the purpose of validating the experiment, j-boxes were adhered to a substrate, loaded with a prescribed weight, and then subjected to aging. The replicate mock-modules were aged in an environmental chamber (at 85 degrees C/85% relative humidity for 1000 hours; then 100 degrees C/<10% relative humidity for 200 hours) or fielded in Golden (CO), Miami (FL), and Phoenix (AZ) for one year. Attachment strength tests, including pluck and shear test geometries, were also performed on smaller component specimens.« less

  3. Trial Run of a Junction-Box Attachment Test for Use in Photovoltaic Module Qualification (Presentation)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, D.; Deibert, S.; Wohlgemuth, J.

    Engineering robust adhesion of the junction-box (j-box) is a hurdle typically encountered by photovoltaic (PV) module manufacturers during product development and manufacturing process control. There are historical incidences of adverse effects (e.g., fires), caused when the j-box/adhesive/module system has failed in the field. The addition of a weight to the j-box during the 'damp-heat', 'thermal-cycle', or 'creep' tests within the IEC qualification protocol is proposed to verify the basic robustness of the adhesion system. The details of the proposed test are described, in addition to a trial run of the test procedure. The described experiments examine 4 moisture-cured silicones, 4more » foam tapes, and a hot-melt adhesive used in conjunction with glass, KPE, THV, and TPE substrates. For the purpose of validating the experiment, j-boxes were adhered to a substrate, loaded with a prescribed weight, and then subjected to aging. The replicate mock-modules were aged in an environmental chamber (at 85 deg C/85% relative humidity for 1000 hours; then 100 degrees C/<10% relative humidity for 200 hours) or fielded in Golden, Miami, and Phoenix for 1 year. Attachment strength tests, including pluck and shear test geometries, were also performed on smaller component specimens.« less

  4. Development and Execution of a Large-scale DDT Tube Test for IHE Material Qualification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parker, Gary Robert; Broilo, Robert M.; Lopez-Pulliam, Ian Daniel

    Insensitive High Explosive (IHE) Materials are defined in Chapter IX of the DOE Explosive Safety Standard (DOE-STD-1212-2012) as being materials that are massdetonable explosives that are so insensitive that the probability of accidental initiation or transition from burning to detonation is negligible1. There are currently a number of tests included in the standard that are required to qualify a material as IHE, however, none of the tests directly evaluate for the transition from burning to detonation (aka deflagration-to-detonation transition, DDT). Currently, there is a DOE complex-wide effort to revisit the IHE definition in DOE-STD-1212-2012 and change the qualification requirements. Themore » proposal lays out a new approach, requiring fewer, but more appropriate tests, for IHE Material qualification. One of these new tests is the Deflagration-to-Detonation Test. According to the redefinition proposal, the purpose of the new deflagration-todetonation test is “to demonstrate that an IHE material will not undergo deflagration-to-detonation under stockpile relevant conditions of scale, confinement, and material condition. Inherent in this test design is the assumption that ignition does occur, with onset of deflagration. The test design will incorporate large margins and replicates to account for the stochastic nature of DDT events.” In short, the philosophy behind this approach is that if a material fails to undergo DDT in a significant over-test, then it is extremely unlikely to do so in realistic conditions. This effort will be valuable for the B61 LEP to satisfy their need qualify the new production lots of PBX 9502. The work described in this report is intended as a preliminary investigation to support the proposed design of an overly conservative, easily fielded DDT test for updated IHE Material Qualification standard. Specifically, we evaluated the aspects of confinement, geometry, material morphology and temperature. We also developed and tested a

  5. Reactor Testing and Qualification: Prioritized High-level Criticality Testing Needs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    S. Bragg-Sitton; J. Bess; J. Werner

    2011-09-01

    Researchers at the Idaho National Laboratory (INL) were tasked with reviewing possible criticality testing needs to support development of the fission surface power system reactor design. Reactor physics testing can provide significant information to aid in development of technologies associated with small, fast spectrum reactors that could be applied for non-terrestrial power systems, leading to eventual system qualification. Several studies have been conducted in recent years to assess the data and analyses required to design and build a space fission power system with high confidence that the system will perform as designed [Marcille, 2004a, 2004b; Weaver, 2007; Parry et al.,more » 2008]. This report will provide a summary of previous critical tests and physics measurements that are potentially applicable to the current reactor design (both those that have been benchmarked and those not yet benchmarked), summarize recent studies of potential nuclear testing needs for space reactor development and their applicability to the current baseline fission surface power (FSP) system design, and provide an overview of a suite of tests (separate effects, sub-critical or critical) that could fill in the information database to improve the accuracy of physics modeling efforts as the FSP design is refined. Some recommendations for tasks that could be completed in the near term are also included. Specific recommendations on critical test configurations will be reserved until after the sensitivity analyses being conducted by Los Alamos National Laboratory (LANL) are completed (due August 2011).« less

  6. Space Technology-5 Lithium-Ion Battery Design, Qualification and Integration and Testing

    NASA Technical Reports Server (NTRS)

    Rao, Gopalakishna M.; Stewart, Karen; Ameen, Syed; Banfield, Peter K.

    2005-01-01

    This document is a viewgraph presentation that reviews the Lithium Ion Battery for the Space Technology-5 (ST-5) mission. Included in the document is a review of the ST-5 Mission, a review of the battery requirements, a description of the battery and the battery materials. The testing and the integration and qualification data is reviewed.

  7. 7 CFR 1724.4 - Qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.4 Qualifications. The borrower shall ensure that: (a) All selected architects and engineers meet the applicable... architects and engineers are familiar with RUS standards and requirements; and (c) All selected architects...

  8. 7 CFR 1724.4 - Qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.4 Qualifications. The borrower shall ensure that: (a) All selected architects and engineers meet the applicable... architects and engineers are familiar with RUS standards and requirements; and (c) All selected architects...

  9. 7 CFR 1724.4 - Qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.4 Qualifications. The borrower shall ensure that: (a) All selected architects and engineers meet the applicable... architects and engineers are familiar with RUS standards and requirements; and (c) All selected architects...

  10. 7 CFR 1724.4 - Qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.4 Qualifications. The borrower shall ensure that: (a) All selected architects and engineers meet the applicable... architects and engineers are familiar with RUS standards and requirements; and (c) All selected architects...

  11. 7 CFR 1724.4 - Qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES General § 1724.4 Qualifications. The borrower shall ensure that: (a) All selected architects and engineers meet the applicable... architects and engineers are familiar with RUS standards and requirements; and (c) All selected architects...

  12. Test Purchaser Qualifications: Present Practice, Professional Needs, and a Proposed System. Issues in Scientific Psychology.

    ERIC Educational Resources Information Center

    Moreland, Kevin L.; And Others

    Three papers are included in this document. The first, "An Introduction to the Problem of Test User Qualifications," by Kevin L. Moreland, is a short history of the American Psychological Association (APA)/American Educational Research Association (AERA)/National Council on Measurement in Education (NCME) Working Group on Test User…

  13. 49 CFR Appendix B to Part 240 - Procedures for Submission and Approval of Locomotive Engineer Qualification Programs

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... determining the qualifications of each person it permits or requires to operate a locomotive. In designing its...) for train control that are employed, the operational design characteristics of the track and equipment... completion of a course of study, or successful passage of a standardized testing program, the submission must...

  14. 49 CFR Appendix B to Part 240 - Procedures for Submission and Approval of Locomotive Engineer Qualification Programs

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... determining the qualifications of each person it permits or requires to operate a locomotive. In designing its...) for train control that are employed, the operational design characteristics of the track and equipment... completion of a course of study, or successful passage of a standardized testing program, the submission must...

  15. 49 CFR Appendix B to Part 240 - Procedures for Submission and Approval of Locomotive Engineer Qualification Programs

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... determining the qualifications of each person it permits or requires to operate a locomotive. In designing its...) for train control that are employed, the operational design characteristics of the track and equipment... completion of a course of study, or successful passage of a standardized testing program, the submission must...

  16. 49 CFR Appendix B to Part 240 - Procedures for Submission and Approval of Locomotive Engineer Qualification Programs

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... determining the qualifications of each person it permits or requires to operate a locomotive. In designing its...) for train control that are employed, the operational design characteristics of the track and equipment... completion of a course of study, or successful passage of a standardized testing program, the submission must...

  17. 49 CFR Appendix B to Part 240 - Procedures for Submission and Approval of Locomotive Engineer Qualification Programs

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... determining the qualifications of each person it permits or requires to operate a locomotive. In designing its...) for train control that are employed, the operational design characteristics of the track and equipment... completion of a course of study, or successful passage of a standardized testing program, the submission must...

  18. 10 CFR 26.85 - Collector qualifications and responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Collector qualifications and responsibilities. 26.85 Section 26.85 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.85 Collector qualifications and responsibilities. (a) Urine collector qualifications. Urine...

  19. 10 CFR 26.85 - Collector qualifications and responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Collector qualifications and responsibilities. 26.85 Section 26.85 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.85 Collector qualifications and responsibilities. (a) Urine collector qualifications. Urine...

  20. 10 CFR 26.85 - Collector qualifications and responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Collector qualifications and responsibilities. 26.85 Section 26.85 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.85 Collector qualifications and responsibilities. (a) Urine collector qualifications. Urine...

  1. 10 CFR 26.85 - Collector qualifications and responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Collector qualifications and responsibilities. 26.85 Section 26.85 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.85 Collector qualifications and responsibilities. (a) Urine collector qualifications. Urine...

  2. 10 CFR 26.85 - Collector qualifications and responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Collector qualifications and responsibilities. 26.85 Section 26.85 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.85 Collector qualifications and responsibilities. (a) Urine collector qualifications. Urine...

  3. The Reliability of Results from National Tests, Public Examinations, and Vocational Qualifications in England

    ERIC Educational Resources Information Center

    He, Qingping; Opposs, Dennis

    2012-01-01

    National tests, public examinations, and vocational qualifications in England are used for a variety of purposes, including the certification of individual learners in different subject areas and the accountability of individual professionals and institutions. However, there has been ongoing debate about the reliability and validity of their…

  4. Environmental qualification testing of the prototype pool boiling experiment

    NASA Technical Reports Server (NTRS)

    Sexton, J. Andrew

    1992-01-01

    The prototype Pool Boiling Experiment (PBE) flew on the STS-47 mission in September 1992. This report describes the purpose of the experiment and the environmental qualification testing program that was used to prove the integrity of the prototype hardware. Component and box level vibration and thermal cycling tests were performed to give an early level of confidence in the hardware designs. At the system level, vibration, thermal extreme soaks, and thermal vacuum cycling tests were performed to qualify the complete design for the expected shuttle environment. The system level vibration testing included three axis sine sweeps and random inputs. The system level hot and cold soak tests demonstrated the hardware's capability to operate over a wide range of temperatures and gave the project team a wider latitude in determining which shuttle thermal altitudes were compatible with the experiment. The system level thermal vacuum cycling tests demonstrated the hardware's capability to operate in a convection free environment. A unique environmental chamber was designed and fabricated by the PBE team and allowed most of the environmental testing to be performed within the project's laboratory. The completion of the test program gave the project team high confidence in the hardware's ability to function as designed during flight.

  5. BSM Delta Qualification 2, volume 3, book 2

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This report, presented in three volumes, provides the results of a two-motor Delta Qualification 2 program conducted in 1993 to certify the following enhancements for incorporation into booster separation motor (BSM0 flight hardware: vulcanized-in-place nozzle aft closure insulation; new iso-static ATJ bulk graphite throat insert material, adhesive EA9394 for bonding the nozzle throat, igniter grain rod/centering insert/igniter case; deletion of the igniter adapter insulator ring; deletion of the igniter adapter/igniter case interface RTV; and deletion of loctite from igniter retainer plate threads. The enhancements above directly resulted from (1) the BSM total quality management (TQM) team initiatives to enhance the BSM producibility, and (2) the necessity to qualify new throat insert and adhesive systems to replace existing materials that will not be available. Testing was completed at both the component and motor levels. Component testing was accomplished to screen candidate materials (e.g., throat materials, adhesive systems) and to optimize processes (e.g., aft closure insulator vulcanization approach) prior to their incorporation into the test motors. Motor testing--consisting of two motors, randomly selected by USBI's on-site quality personnel from production lot AAY, which were modified to accept the enhancements -- was completed to provide the final qualification of the enhancements for incorporation into flight hardware. Volume 3, Book 2 provides various supporting documentation to the previous volumes with regards to the testing of the two Delta qualification units: data acceptance records, thermal conditioning analysis, igniter adapter thermal flake analysis, laboratory adhesive (EA-9394) qualification report, throat insert thermal/structural analysis, Delta Qualification Nonconformance Reports (NCR's), O-ring seating tests, and interim test report for vulcanization process qualification.

  6. Toddler test or procedure preparation

    MedlinePlus

    Preparing toddler for test/procedure; Test/procedure preparation - toddler; Preparing for a medical test or procedure - toddler ... Before the test, know that your child will probably cry. Even if you prepare, your child may feel some discomfort or ...

  7. EDS V25 containment vessel explosive qualification test report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rudolphi, John Joseph

    2012-04-01

    The V25 containment vessel was procured by the Project Manager, Non-Stockpile Chemical Materiel (PMNSCM) as a replacement vessel for use on the P2 Explosive Destruction Systems. It is the first EDS vessel to be fabricated under Code Case 2564 of the ASME Boiler and Pressure Vessel Code, which provides rules for the design of impulsively loaded vessels. The explosive rating for the vessel based on the Code Case is nine (9) pounds TNT-equivalent for up to 637 detonations. This limit is an increase from the 4.8 pounds TNT-equivalency rating for previous vessels. This report describes the explosive qualification tests thatmore » were performed in the vessel as part of the process for qualifying the vessel for explosive use. The tests consisted of a 11.25 pound TNT equivalent bare charge detonation followed by a 9 pound TNT equivalent detonation.« less

  8. Preschooler test or procedure preparation

    MedlinePlus

    Preparing preschoolers for test/procedure; Test/procedure preparation - preschooler ... Preparing children for medical tests can reduce their anxiety. It can also make them less likely to cry and resist the procedure. Research shows that ...

  9. Equivalent electron fluence for space qualification of shallow junction heteroface GaAs solar cells

    NASA Technical Reports Server (NTRS)

    Wilson, J. W.; Stock, L. V.

    1984-01-01

    It is desirable to perform qualification tests prior to deployment of solar cells in space power applications. Such test procedures are complicated by the complex mixture of differing radiation components in space which are difficult to simulate in ground test facilities. Although it has been shown that an equivalent electron fluence ratio cannot be uniquely defined for monoenergetic proton exposure of GaAs shallow junction cells, an equivalent electron fluence test can be defined for common spectral components of protons found in space. Equivalent electron fluence levels for the geosynchronous environment are presented.

  10. RSRM nozzle actuator bracket/lug fracture mechanics qualification test

    NASA Technical Reports Server (NTRS)

    Kelley, Peggy

    1993-01-01

    This is the final report for the actuator bracket/lug fracture mechanics qualification test. The test plan (CTP-0071) outlined a two-phase test program designed to answer questions about the fracture criticality of the redesigned solid rocket motor (RSRM) nozzle actuator bracket. An analysis conducted using the NASA/FLAGRO fracture mechanics computer program indicated that the actuator bracket might be a fracture critical component. In the NASA/FLAGRO analysis, a simple lug model was used to represent the actuator bracket. It was calculated that the bracket would fracture if subjected to an actuator stall load in the presence of a 0.10 in. corner crack at the actuator attachment hole. The 0.10 in. crack size corresponds to the nondestructive inspection detectability limit for the actuator bracket. The inspection method used is the dye penetrant method. The actuator stall load (103,424 lb) is the maximum load which the actuator bracket is required to withstand during motor operation. This testing was designed to establish the accuracy of the analytical model and to directly determine whether the actuator bracket is capable of meeting fracture mechanics safe-life requirements.

  11. 40 CFR 1033.315 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 33 2011-07-01 2011-07-01 false Test procedures. 1033.315 Section 1033... Programs § 1033.315 Test procedures. (a) Test procedures. Use the test procedures described in subpart F of this part, except as specified in this section. (1) You may ask to use other test procedures. We will...

  12. 40 CFR 1033.315 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Test procedures. 1033.315 Section 1033... Programs § 1033.315 Test procedures. (a) Test procedures. Use the test procedures described in subpart F of this part, except as specified in this section. (1) You may ask to use other test procedures. We will...

  13. 40 CFR 1033.315 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Test procedures. 1033.315 Section 1033... Programs § 1033.315 Test procedures. (a) Test procedures. Use the test procedures described in subpart F of this part, except as specified in this section. (1) You may ask to use other test procedures. We will...

  14. Qualification of the flight-critical AFTI/F-16 digital flight control system. [Advanced Fighter Technology Integration

    NASA Technical Reports Server (NTRS)

    Mackall, D. A.; Ishmael, S. D.; Regenie, V. A.

    1983-01-01

    Qualification considerations for assuring the safety of a life-critical digital flight control system include four major areas: systems interactions, verification, validation, and configuration control. The AFTI/F-16 design, development, and qualification illustrate these considerations. In this paper, qualification concepts, procedures, and methodologies are discussed and illustrated through specific examples.

  15. Requirements and test results for the qualification of thermal control coatings

    NASA Technical Reports Server (NTRS)

    Brzuskiewicz, J. E.; Zerlaut, G. A.; Lauder, K.; Miller, G. M.

    1988-01-01

    Paint type coatings are often used as engineering materials in critical satellite temperature control applications. The functional features of coatings used for temperature control purposes must remain stable throughout the satellite manufacturing process and the satellite mission. The selection of a particular coating depends on matching coating characteristics to mission requirements. The use of paint coatings on satellites, although having an extensive history, requires that the paint be qualified to each application on an individual basis. Thus, the qualification process through testing serves to ensure that paint coatings as engineering materials will fulfill design requirements.

  16. Some Remarks on Foundation Pile Testing Procedures

    NASA Astrophysics Data System (ADS)

    Rybak, Jarosław

    2017-10-01

    This work presents the review of pile capacity testing techniques. In an overview, the key points in pile designing are: determination of the appropriate computational schemes, reliable data on loads and the properties of structural materials (in particular, of the soil mass, which is marked by the greatest variability). The procedure of constructing a pile foundation should include: carrying out soil tests in the scope that ensures safe designing, selecting a piling technology that is relevant both to geotechnical conditions and expected loads, drafting a piling design together with the design of load tests, setting up a testing station for further load tests, static and/or dynamic tests of pile load capacity, preceded by supplementary soil tests when the conditions of test pile installation fail to comply with the design assumptions or when the pile length exceeds the depth of the previously investigated soil, making documentation of load capacity tests (with an additional correction of the piling design), the actual piling (ongoing analysis of pile driving logs and, if necessary, testing the piles’ integrity), drawing up the as-built documentation. Unfortunately, the design is corrected after the load test have been conducted only if the piles fail to show the designed bearing capacity. The designer is then obliged to revise the design assumptions on the basis of tests results. If the test results account for the a greater bearing capacity than necessary and it would be recommendable to limit the extent of the planned (i.e. set out in the contract) piling works, usually neither the contractor nor the designer, nor even the Construction Site Supervisor, acting for the benefit of the Investor, are willing to take on the responsibility for reducing the scope of the piling works. The necessity of conducting additional control tests before and during the implementation of the construction project is often treated by the investors as an attempt at extorting extra

  17. 10 CFR 431.154 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Test procedures. 431.154 Section 431.154 Energy DEPARTMENT... EQUIPMENT Commercial Clothers Washers Test Procedures § 431.154 Test procedures. The test procedures for residential clothes washers in Appendix J1 to subpart B of part 430 of this title shall be used to test...

  18. Qualification test results for DOE solar photovoltaic flat panel procurement - PRDA 38

    NASA Technical Reports Server (NTRS)

    Griffith, J. S.

    1980-01-01

    Twelve types of prototypes modules for the DOE Photovoltaic Flat Panel Procurement (PRDA 38) were subjected to qualification tests at the Jet Propulsion Laboratory according to a new specification. Environmental exposures were carried out separately and included temperature cycling, humidity, wind simulation, and hail. The most serious problems discovered were reduced insulation resistance to ground and ground continuity of the metal frames, electrical degradation, erratic power readings, and delamination. The electrical and physical characteristics of the newly received modules are also given.

  19. 16 CFR 1512.18 - Tests and test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... plane containing both wheels and the centerlines of the down tube and seat mast. (ii) Post test: The... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Tests and test procedures. 1512.18 Section... REGULATIONS REQUIREMENTS FOR BICYCLES Regulations § 1512.18 Tests and test procedures. (a) Sharp edge test...

  20. 16 CFR 1512.18 - Tests and test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... plane containing both wheels and the centerlines of the down tube and seat mast. (ii) Post test: The... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Tests and test procedures. 1512.18 Section... REGULATIONS REQUIREMENTS FOR BICYCLES Regulations § 1512.18 Tests and test procedures. (a) Sharp edge test...

  1. 16 CFR 1512.18 - Tests and test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... seat mast. (ii) Post test: The optical axis of the reflector shall remain parallel within 5° to the... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Tests and test procedures. 1512.18 Section... REGULATIONS REQUIREMENTS FOR BICYCLES Regulations § 1512.18 Tests and test procedures. (a) Sharp edge test...

  2. 16 CFR 1512.18 - Tests and test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... seat mast. (ii) Post test: The optical axis of the reflector shall remain parallel within 5° to the... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Tests and test procedures. 1512.18 Section... REGULATIONS REQUIREMENTS FOR BICYCLES Regulations § 1512.18 Tests and test procedures. (a) Sharp edge test...

  3. 7 CFR 1726.23 - Qualification of bidders.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.23 Qualification of bidders. (a) Qualified bidder list (QBL). The borrower shall (acting through its engineer, if applicable... bidder. (b) Conflict of interest. If there is a relationship between the borrower or engineer and a...

  4. 7 CFR 1726.23 - Qualification of bidders.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.23 Qualification of bidders. (a) Qualified bidder list (QBL). The borrower shall (acting through its engineer, if applicable... bidder. (b) Conflict of interest. If there is a relationship between the borrower or engineer and a...

  5. 7 CFR 1726.23 - Qualification of bidders.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.23 Qualification of bidders. (a) Qualified bidder list (QBL). The borrower shall (acting through its engineer, if applicable... bidder. (b) Conflict of interest. If there is a relationship between the borrower or engineer and a...

  6. 7 CFR 1726.23 - Qualification of bidders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.23 Qualification of bidders. (a) Qualified bidder list (QBL). The borrower shall (acting through its engineer, if applicable... bidder. (b) Conflict of interest. If there is a relationship between the borrower or engineer and a...

  7. 7 CFR 1726.23 - Qualification of bidders.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.23 Qualification of bidders. (a) Qualified bidder list (QBL). The borrower shall (acting through its engineer, if applicable... bidder. (b) Conflict of interest. If there is a relationship between the borrower or engineer and a...

  8. 40 CFR 90.508 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures. 90.508 Section 90.508....508 Test procedures. (a) For nonroad engines subject to the provisions of this subpart, the prescribed test procedures are the appropriate small SI engine test procedures as described in subpart E of this...

  9. 40 CFR 89.508 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures. 89.508 Section 89.508... Test procedures. (a)(1) For nonroad engines subject to the provisions of this subpart, the prescribed test procedures are the nonroad engine 8-mode test procedure as described in subpart E of this part...

  10. 40 CFR 53.65 - Test procedure: Loading test.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 6 2014-07-01 2014-07-01 false Test procedure: Loading test. 53.65... Characteristics of Class II Equivalent Methods for PM 2.5 § 53.65 Test procedure: Loading test. (a) Overview. (1) The loading tests are designed to quantify any appreciable changes in a candidate method sampler's...

  11. 40 CFR 53.65 - Test procedure: Loading test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Loading test. 53.65... Characteristics of Class II Equivalent Methods for PM2.5 § 53.65 Test procedure: Loading test. (a) Overview. (1) The loading tests are designed to quantify any appreciable changes in a candidate method sampler's...

  12. 40 CFR 53.65 - Test procedure: Loading test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Test procedure: Loading test. 53.65... Characteristics of Class II Equivalent Methods for PM2.5 § 53.65 Test procedure: Loading test. (a) Overview. (1) The loading tests are designed to quantify any appreciable changes in a candidate method sampler's...

  13. 40 CFR 53.65 - Test procedure: Loading test.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 6 2012-07-01 2012-07-01 false Test procedure: Loading test. 53.65... Characteristics of Class II Equivalent Methods for PM2.5 § 53.65 Test procedure: Loading test. (a) Overview. (1) The loading tests are designed to quantify any appreciable changes in a candidate method sampler's...

  14. Effluent Management Facility Evaporator Bottom-Waste Streams Formulation and Waste Form Qualification Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saslow, Sarah A.; Um, Wooyong; Russell, Renee L.

    This report describes the results from grout formulation and cementitious waste form qualification testing performed by Pacific Northwest National Laboratory (PNNL) for Washington River Protection Solutions, LLC (WRPS). These results are part of a screening test that investigates three grout formulations proposed for wide-range treatment of different waste stream compositions expected for the Hanford Effluent Management Facility (EMF) evaporator bottom waste. This work supports the technical development need for alternative disposition paths for the EMF evaporator bottom wastes and future direct feed low-activity waste (DFLAW) operations at the Hanford Site. High-priority activities included simulant production, grout formulation, and cementitious wastemore » form qualification testing. The work contained within this report relates to waste form development and testing, and does not directly support the 2017 Integrated Disposal Facility (IDF) performance assessment (PA). However, this work contains valuable information for use in PA maintenance past FY 2017 and future waste form development efforts. The provided results and data should be used by (1) cementitious waste form scientists to further the understanding of cementitious leach behavior of contaminants of concern (COCs), (2) decision makers interested in off-site waste form disposal, and (3) the U.S. Department of Energy, their Hanford Site contractors and stakeholders as they assess the IDF PA program at the Hanford Site. The results reported help fill existing data gaps, support final selection of a cementitious waste form for the EMF evaporator bottom waste, and improve the technical defensibility of long-term waste form risk estimates.« less

  15. 26 CFR 20.6036-2 - Notice of qualification as executor of estate of decedent dying after 1970.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 14 2010-04-01 2010-04-01 false Notice of qualification as executor of estate... AUGUST 16, 1954 Procedure and Administration § 20.6036-2 Notice of qualification as executor of estate of... special notice of qualification as executor of an estate is required to be filed. The requirement of...

  16. Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Engineering Test Report: AMSU-A1 EOS Instrument, (S/N 202) Qualification Level Vibration Tests of August/September 1998, (S/O 565632, OC-417) Plus Addendum A

    NASA Technical Reports Server (NTRS)

    Heffer, R.

    1998-01-01

    The purpose of this report is to present a qualification level vibration testing performed on the S/N 202, EOS AMSU-A1 Instrument was vibration tested to qualification levels per the Ref. 1 shop order. The instrument withstood the 8 g sine sweep test, the 7.5 Grms random vibration test, and the 18.75 g sine burst test in each of the three orthogonal axes. Some loss of transmissibility, however, is seen in the lower reflector after Z-axis random vibration. The test sequence was not without incidence. Failure of Channel 7 in the Limited Performance Test (LPT) performed after completion of the 1 st (X-axis) axis vibration sequence, required replacement of the DRO and subsequent re-testing of the instrument. The post-vibration comprehensive performance test (CPT) was successfully run after completion of the three axes of vibration with the replacement component installed in the instrument. Passing the CPT signified the successful completion of the S/N 202 A1 qualification vibration testing.

  17. Qualification testing of fiber-based laser transmitters and on-orbit validation of a commercial laser system

    NASA Astrophysics Data System (ADS)

    Wright, M. W.; Wilkerson, M. W.; Tang, R. R.

    2017-11-01

    Qualification testing of fiber based laser transmitters is required for NASA's Deep Space Optical Communications program to mature the technology for space applications. In the absence of fully space qualified systems, commercial systems have been investigated in order to demonstrate the robustness of the technology. To this end, a 2.5 W fiber based laser source was developed as the transmitter for an optical communications experiment flown aboard the ISS as a part of a technology demonstration mission. The low cost system leveraged Mil Standard design principles and Telcordia certified components to the extent possible and was operated in a pressure vessel with active cooling. The laser was capable of high rate modulation but was limited by the mission requirements to 50 Mbps for downlinking stored video from the OPALS payload, externally mounted on the ISS. Environmental testing and space qualification of this unit will be discussed along with plans for a fully space qualified laser transmitter.

  18. Test Operations Procedure (TOP) 03-2-827 Test Procedures for Video Target Scoring Using Calibration Lights

    DTIC Science & Technology

    2016-04-04

    Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 03-2-827 Test Procedures for Video Target Scoring Using...ABSTRACT This Test Operations Procedure (TOP) describes typical equipment and procedures to setup and operate a Video Target Scoring System (VTSS) to...lights. 15. SUBJECT TERMS Video Target Scoring System, VTSS, witness screens, camera, target screen, light pole 16. SECURITY

  19. 40 CFR 92.506 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures. 92.506 Section 92.506... and Audit Programs § 92.506 Test procedures. (a)(1) For locomotives and locomotive engines subject to the provisions of this subpart, the prescribed test procedures are those procedures described in...

  20. Techniques for control of long-term reliability of complex integrated circuits. I - Reliability assurance by test vehicle qualification.

    NASA Technical Reports Server (NTRS)

    Van Vonno, N. W.

    1972-01-01

    Development of an alternate approach to the conventional methods of reliability assurance for large-scale integrated circuits. The product treated is a large-scale T squared L array designed for space applications. The concept used is that of qualification of product by evaluation of the basic processing used in fabricating the product, providing an insight into its potential reliability. Test vehicles are described which enable evaluation of device characteristics, surface condition, and various parameters of the two-level metallization system used. Evaluation of these test vehicles is performed on a lot qualification basis, with the lot consisting of one wafer. Assembled test vehicles are evaluated by high temperature stress at 300 C for short time durations. Stressing at these temperatures provides a rapid method of evaluation and permits a go/no go decision to be made on the wafer lot in a timely fashion.

  1. Options and Risk for Qualification of Electric Propulsion System

    NASA Technical Reports Server (NTRS)

    Bailey, Michelle; Daniel, Charles; Cook, Steve (Technical Monitor)

    2002-01-01

    Electric propulsion vehicle systems envelop a wide range of propulsion alternatives including solar and nuclear, which present unique circumstances for qualification. This paper will address the alternatives for qualification of electric propulsion spacecraft systems. The approach taken will be to address the considerations for qualification at the various levels of systems definition. Additionally, for each level of qualification the system level risk implications will be developed. Also, the paper will explore the implications of analysis verses test for various levels of systems definition, while retaining the objectives of a verification program. The limitations of terrestrial testing will be explored along with the risk and implications of orbital demonstration testing. The paper will seek to develop a template for structuring of a verification program based on cost, risk and value return. A successful verification program should establish controls and define objectives of the verification compliance program. Finally the paper will seek to address the political and programmatic factors, which may impact options for system verification.

  2. Joint helmet-mounted cueing system (JHMCS) helmet qualification testing requirements

    NASA Astrophysics Data System (ADS)

    Orf, Garry W.

    1998-08-01

    The Joint Helmet-Mounted Cueing System (JHMCS) program will provide capability to cue high off-boresight (HOBS) weapons to the operator's line of sight and to confirm weapon sensor LOS for the US Air Force and US Navy (USN) aircrew. This capability will ensure the USAF and USN pilots a first shot opportunity. The JHMCS incorporates an ejection-compatible helmet-mounted display system that will be installed on F- 15, F-16, F/A-18, and F-22 aircraft. The JHMCS includes a flight helmet with display optics, miniature cathode ray tube, magnetic receiver unit, miniature camera, automatic brightness control sensor, and microcontroller. The flight helmet for JHMCS is based on the new lightweight HGU-55A/P. This paper describes the requirements for the helmet qualification tests including: windblast, ejection tower, hanging harness, centrifuge, mass properties, energy attenuation and penetration resistance, noise attenuation, visor characteristics, compatibility demonstration, sled/in- flight ejection, water survival, standard conditions and environment. The test objective, success criteria, equipment configuration, and data collection requirements for each test is discussed.

  3. Examination of a Junction-Box Adhesion Test for Use in Photovoltaic Module Qualification: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, D. C.; Wohlgemuth, J. H.

    2012-08-01

    Engineering robust adhesion of the junction-box (j-box) is a hurdle typically encountered by photovoltaic (PV) module manufacturers during product development. There are historical incidences of adverse effects (e.g., fires) caused when the j-box/adhesive/module system has failed in the field. The addition of a weight to the j-box during the 'damp heat' IEC qualification test is proposed to verify the basic robustness of its adhesion system. The details of the proposed test will be described, in addition to the preliminary results obtained using representative materials and components. The described discovery experiments examine moisture-cured silicone, foam tape, and hot-melt adhesives used inmore » conjunction with PET or glass module 'substrates.' To be able to interpret the results, a set of material-level characterizations was performed, including thermogravimetric analysis, differential scanning calorimetry, and dynamic mechanical analysis. PV j-boxes were adhered to a substrate, loaded with a prescribed weight, and then placed inside an environmental chamber (at 85C, 85% relative humidity). Some systems did not remain attached through the discovery experiments. Observed failure modes include delamination (at the j-box/adhesive or adhesive/substrate interface) and phase change/creep. The results are discussed in the context of the application requirements, in addition to the plan for the formal experiment supporting the proposed modification to the qualification test.« less

  4. 40 CFR 600.111-80 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Test procedures. 600.111-80 Section... Model Year Automobiles-Test Procedures § 600.111-80 Test procedures. (a) The test procedures to be...-78 of this chapter, as applicable. (The evaporative and refueling loss portions of the test procedure...

  5. 40 CFR 600.111-93 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Test procedures. 600.111-93 Section... Model Year Automobiles-Test Procedures § 600.111-93 Test procedures. (a) The test procedures to be... loss portion of the test procedure may be omitted unless specifically required by the Administrator...

  6. Staubli TX-90XL robot qualification at the LLIHE.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Covert, Timothy Todd

    The Light Initiated High Explosive (LIHE) Facility uses a robotic arm to spray explosive material onto test items for impulse tests. In 2007, the decision was made to replace the existing PUMA 760 robot with the Staubli TX-90XL. A qualification plan was developed and implemented to verify the safe operating conditions and failure modes of the new system. The robot satisfied the safety requirements established in the qualification plan. A performance issue described in this report remains unresolved at the time of this publication. The final readiness review concluded the qualification of this robot at the LIHE facility.

  7. 16 CFR 1610.6 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedure. 1610.6 Section 1610.6... FLAMMABILITY OF CLOTHING TEXTILES The Standard § 1610.6 Test procedure. The test procedure is divided into two... according to paragraph (b)(1) of this section. (a) Step 1—Testing in the original state. (1) Tests shall be...

  8. 16 CFR 1610.6 - Test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Test procedure. 1610.6 Section 1610.6... FLAMMABILITY OF CLOTHING TEXTILES The Standard § 1610.6 Test procedure. The test procedure is divided into two... according to paragraph (b)(1) of this section. (a) Step 1—Testing in the original state. (1) Tests shall be...

  9. 16 CFR 1610.6 - Test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Test procedure. 1610.6 Section 1610.6... FLAMMABILITY OF CLOTHING TEXTILES The Standard § 1610.6 Test procedure. The test procedure is divided into two... according to paragraph (b)(1) of this section. (a) Step 1—Testing in the original state. (1) Tests shall be...

  10. 40 CFR 600.111-08 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 30 2014-07-01 2014-07-01 false Test procedures. 600.111-08 Section... Emission Test Procedures § 600.111-08 Test procedures. This section describes test procedures for the FTP, highway fuel economy test (HFET), US06, SC03, and the cold temperature FTP tests. Perform testing...

  11. 40 CFR 600.111-08 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 31 2012-07-01 2012-07-01 false Test procedures. 600.111-08 Section... Emission Test Procedures § 600.111-08 Test procedures. This section provides test procedures for the FTP, highway, US06, SC03, and the cold temperature FTP tests. Testing shall be performed according to test...

  12. ELIMINATION OF THE CHARACTERIZATION OF DWPF POUR STREAM SAMPLE AND THE GLASS FABRICATION AND TESTING OF THE DWPF SLUDGE BATCH QUALIFICATION SAMPLE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Amoroso, J.; Peeler, D.; Edwards, T.

    2012-05-11

    A recommendation to eliminate all characterization of pour stream glass samples and the glass fabrication and Product Consistency Test (PCT) of the sludge batch qualification sample was made by a Six-Sigma team chartered to eliminate non-value-added activities for the Defense Waste Processing Facility (DWPF) sludge batch qualification program and is documented in the report SS-PIP-2006-00030. That recommendation was supported through a technical data review by the Savannah River National Laboratory (SRNL) and is documented in the memorandums SRNL-PSE-2007-00079 and SRNL-PSE-2007-00080. At the time of writing those memorandums, the DWPF was processing sludge-only waste but, has since transitioned to a coupledmore » operation (sludge and salt). The SRNL was recently tasked to perform a similar data review relevant to coupled operations and re-evaluate the previous recommendations. This report evaluates the validity of eliminating the characterization of pour stream glass samples and the glass fabrication and Product Consistency Test (PCT) of the sludge batch qualification samples based on sludge-only and coupled operations. The pour stream sample has confirmed the DWPF's ability to produce an acceptable waste form from Slurry Mix Evaporator (SME) blending and product composition/durability predictions for the previous sixteen years but, ultimately the pour stream analysis has added minimal value to the DWPF's waste qualification strategy. Similarly, the information gained from the glass fabrication and PCT of the sludge batch qualification sample was determined to add minimal value to the waste qualification strategy since that sample is routinely not representative of the waste composition ultimately processed at the DWPF due to blending and salt processing considerations. Moreover, the qualification process has repeatedly confirmed minimal differences in glass behavior from actual radioactive waste to glasses fabricated from simulants or batch chemicals. In

  13. Rover Low Gain Antenna Qualification for Deep Space Thermal Environments

    NASA Technical Reports Server (NTRS)

    Ramesham, Rajeshuni; Amaro, Luis R.; Brown, Paula R.; Usiskin, Robert; Prater, Jack L.

    2013-01-01

    A method to qualify the Rover Low Gain Antenna (RLGA) for use during the Mars Science Laboratory (MSL) mission has been devised. The RLGA antenna must survive all ground operations, plus the nominal 670 Martian sol mission that includes the summer and winter seasons of the Mars thermal environment. This qualification effort was performed to verify that the RLGA design, its bonding, and packaging processes are adequate. The qualification test was designed to demonstrate a survival life of three times more than all expected ground testing, plus a nominal 670 Martian sol missions. Baseline RF tests and a visual inspection were performed on the RLGA hardware before the start of the qualification test. Functional intermittent RF tests were performed during thermal chamber breaks over the course of the complete qualification test. For the return loss measurements, the RLGA antenna was moved to a test area. A vector network analyzer was calibrated over the operational frequency range of the antenna. For the RLGA, a simple return loss measurement was performed. A total of 2,010 (3 670 or 3 times mission thermal cycles) thermal cycles was performed. Visual inspection of the RLGA hardware did not show any anomalies due to the thermal cycling. The return loss measurement results of the RLGA antenna after the PQV (Package Qualification and Verification) test did not show any anomalies. The antenna pattern data taken before and after the PQV test at the uplink and downlink frequencies were unchanged. Therefore, the developed design of RLGA is qualified for a long-duration MSL mission.

  14. Open-Source RTOS Space Qualification: An RTEMS Case Study

    NASA Technical Reports Server (NTRS)

    Zemerick, Scott

    2017-01-01

    NASA space-qualification of reusable off-the-shelf real-time operating systems (RTOSs) remains elusive due to several factors notably (1) The diverse nature of RTOSs utilized across NASA, (2) No single NASA space-qualification criteria, lack of verification and validation (V&V) analysis, or test beds, and (3) different RTOS heritages, specifically open-source RTOSs and closed vendor-provided RTOSs. As a leader in simulation test beds, the NASA IV&V Program is poised to help jump-start and lead the space-qualification effort of the open source Real-Time Executive for Multiprocessor Systems (RTEMS) RTOS. RTEMS, as a case-study, can be utilized as an example of how to qualify all RTOSs, particularly the reusable non-commercial (open-source) ones that are gaining usage and popularity across NASA. Qualification will improve the overall safety and mission assurance of RTOSs for NASA-agency wide usage. NASA's involvement in space-qualification of an open-source RTOS such as RTEMS will drive the RTOS industry toward a more qualified and mature open-source RTOS product.

  15. 40 CFR 600.111-08 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Test procedures. 600.111-08 Section... Model Year Automobiles-Test Procedures § 600.111-08 Test procedures. This section provides test procedures for the FTP, highway, US06, SC03, and the cold temperature FTP tests. Testing shall be performed...

  16. 49 CFR 581.7 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Test procedures. 581.7 Section 581.7... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) BUMPER STANDARD § 581.7 Test procedures. (a) Longitudinal impact test procedures. (1) Impact the vehicle's front surface and its rear surface two times each...

  17. 49 CFR 581.7 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Test procedures. 581.7 Section 581.7... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) BUMPER STANDARD § 581.7 Test procedures. (a) Longitudinal impact test procedures. (1) Impact the vehicle's front surface and its rear surface two times each...

  18. 49 CFR 581.7 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Test procedures. 581.7 Section 581.7... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) BUMPER STANDARD § 581.7 Test procedures. (a) Longitudinal impact test procedures. (1) Impact the vehicle's front surface and its rear surface two times each...

  19. Response measurement by laser Doppler vibrometry in vibration qualification tests with non-Gaussian random excitation

    NASA Astrophysics Data System (ADS)

    Troncossi, M.; Di Sante, R.; Rivola, A.

    2016-10-01

    In the field of vibration qualification testing, random excitations are typically imposed on the tested system in terms of a power spectral density (PSD) profile. This is the one of the most popular ways to control the shaker or slip table for durability tests. However, these excitations (and the corresponding system responses) exhibit a Gaussian probability distribution, whereas not all real-life excitations are Gaussian, causing the response to be also non-Gaussian. In order to introduce non-Gaussian peaks, a further parameter, i.e., kurtosis, has to be controlled in addition to the PSD. However, depending on the specimen behaviour and input signal characteristics, the use of non-Gaussian excitations with high kurtosis and a given PSD does not automatically imply a non-Gaussian stress response. For an experimental investigation of these coupled features, suitable measurement methods need to be developed in order to estimate the stress amplitude response at critical failure locations and consequently evaluate the input signals most representative for real-life, non-Gaussian excitations. In this paper, a simple test rig with a notched cantilevered specimen was developed to measure the response and examine the kurtosis values in the case of stationary Gaussian, stationary non-Gaussian, and burst non-Gaussian excitation signals. The laser Doppler vibrometry technique was used in this type of test for the first time, in order to estimate the specimen stress amplitude response as proportional to the differential displacement measured at the notch section ends. A method based on the use of measurements using accelerometers to correct for the occasional signal dropouts occurring during the experiment is described. The results demonstrate the ability of the test procedure to evaluate the output signal features and therefore to select the most appropriate input signal for the fatigue test.

  20. 15 CFR 90.12 - Qualifications of hearing officer.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Qualifications of hearing officer. 90.12 Section 90.12 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade BUREAU OF THE CENSUS, DEPARTMENT OF COMMERCE PROCEDURE FOR CHALLENGING CERTAIN POPULATION AND INCOME...

  1. 15 CFR 90.12 - Qualifications of hearing officer.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 1 2013-01-01 2013-01-01 false Qualifications of hearing officer. 90.12 Section 90.12 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade BUREAU OF THE CENSUS, DEPARTMENT OF COMMERCE PROCEDURE FOR CHALLENGING CERTAIN POPULATION AND INCOME...

  2. 15 CFR 90.12 - Qualifications of hearing officer.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 1 2011-01-01 2011-01-01 false Qualifications of hearing officer. 90.12 Section 90.12 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade BUREAU OF THE CENSUS, DEPARTMENT OF COMMERCE PROCEDURE FOR CHALLENGING CERTAIN POPULATION AND INCOME...

  3. 15 CFR 90.12 - Qualifications of hearing officer.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 1 2012-01-01 2012-01-01 false Qualifications of hearing officer. 90.12 Section 90.12 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade BUREAU OF THE CENSUS, DEPARTMENT OF COMMERCE PROCEDURE FOR CHALLENGING CERTAIN POPULATION AND INCOME...

  4. 28 CFR 34.109 - Qualifications of peer reviewers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... be used in the selection of peer reviewers are: (a) Generalized knowledge of juvenile justice or... 28 Judicial Administration 1 2014-07-01 2014-07-01 false Qualifications of peer reviewers. 34.109 Section 34.109 Judicial Administration DEPARTMENT OF JUSTICE OJJDP COMPETITION AND PEER REVIEW PROCEDURES...

  5. 28 CFR 34.109 - Qualifications of peer reviewers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... be used in the selection of peer reviewers are: (a) Generalized knowledge of juvenile justice or... 28 Judicial Administration 1 2013-07-01 2013-07-01 false Qualifications of peer reviewers. 34.109 Section 34.109 Judicial Administration DEPARTMENT OF JUSTICE OJJDP COMPETITION AND PEER REVIEW PROCEDURES...

  6. 28 CFR 34.109 - Qualifications of peer reviewers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... be used in the selection of peer reviewers are: (a) Generalized knowledge of juvenile justice or... 28 Judicial Administration 1 2012-07-01 2012-07-01 false Qualifications of peer reviewers. 34.109 Section 34.109 Judicial Administration DEPARTMENT OF JUSTICE OJJDP COMPETITION AND PEER REVIEW PROCEDURES...

  7. 28 CFR 34.109 - Qualifications of peer reviewers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... be used in the selection of peer reviewers are: (a) Generalized knowledge of juvenile justice or... 28 Judicial Administration 1 2011-07-01 2011-07-01 false Qualifications of peer reviewers. 34.109 Section 34.109 Judicial Administration DEPARTMENT OF JUSTICE OJJDP COMPETITION AND PEER REVIEW PROCEDURES...

  8. 16 CFR § 1512.18 - Tests and test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... of the down tube and seat mast. (ii) Post test: The optical axis of the reflector shall remain... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Tests and test procedures. § 1512.18... ACT REGULATIONS REQUIREMENTS FOR BICYCLES Regulations § 1512.18 Tests and test procedures. (a) Sharp...

  9. Environmental qualification testing of payload G-534, the Pool Boiling Experiment

    NASA Technical Reports Server (NTRS)

    Sexton, J. Andrew

    1992-01-01

    Payload G-534, the prototype Pool Boiling Experiment (PBE), is scheduled to fly on the STS-47 mission in September 1992. This paper describes the purpose of the experiment and the environmental qualification testing program that was used to prove the integrity of the hardware. Component and box level vibration and thermal cycling tests were performed to give an early level of confidence in the hardware designs. At the system level, vibration, thermal extreme soaks, and thermal vacuum cycling tests were performed to qualify the complete design for the expected shuttle environment. The system level vibration testing included three axis sine sweeps and random inputs. The system level hot and cold soak tests demonstrated the hardware's capability to operate over a wide range of temperatures and gave wider latitude in determining which shuttle thermal attitudes were compatible with the experiment. The system level thermal vacuum cycling tests demonstrated the hardware's capability to operate in a convection free environment. A unique environmental chamber was designed and fabricated by the PBE team and allowed most of the environmental testing to be performed within the hardware build laboratory. The completion of the test program gave the project team high confidence in the hardware's ability to function as designed during flight.

  10. 40 CFR 205.54 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Test procedures. 205.54 Section 205.54... EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.54 Test procedures. The procedures described in this and subsequent sections will be the test program to determine the conformity of vehicles with...

  11. 40 CFR 205.54 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Test procedures. 205.54 Section 205.54... EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.54 Test procedures. The procedures described in this and subsequent sections will be the test program to determine the conformity of vehicles with...

  12. Establishment of an unrelated umbilical cord blood bank qualification program: ensuring quality while meeting Food and Drug Administration vendor qualification requirements.

    PubMed

    Rabe, Fran; Kadidlo, Diane; Van Orsow, Lisa; McKenna, David

    2013-10-01

    Qualification of a cord blood bank (CBB) is a complex process that includes evaluation of multiple aspects of donor screening and testing, processing, accreditation and approval by professional cell therapy groups, and results of received cord blood units. The University of Minnesota Medical Center Cell Therapy Laboratory has established a CBB vendor qualification process to ensure the CBB meets established regulatory and quality requirements. The deployed qualification of CBBs is based on retrospective and prospective review of the CBB. Forty-one CBBs were evaluated retrospectively: seven CBBs were disqualified based on failed quality control (QC) results. Eight CBBs did not meet the criteria for retrospective qualification because fewer than 3 cord blood units were received and the CBB was not accredited. As of March 2012, three US and one non-US CBBs have been qualified prospectively. One CBB withdrew from the qualification process after successful completion of the comprehensive survey and subsequent failure of the provided QC unit to pass the minimum criteria. One CBB failed the prospective qualification process based on processing methods that were revealed during the paper portion of the evaluation. A CBB qualification process is necessary for a transplant center to manage the qualification of the large number of CBBs needed to support a umbilical cord blood transplantation program. A transplant center that has utilized cord blood for a number of years before implementation of a qualification process should use a retrospective qualification process along with a prospective process. © 2013 American Association of Blood Banks.

  13. 40 CFR 90.707 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures. 90.707 Section 90.707... Program § 90.707 Test procedures. (a)(1) For small SI engines subject to the provisions of this subpart, the prescribed test procedures are specified in subpart E of this part. (2) The Administrator may, on...

  14. 40 CFR 90.707 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Test procedures. 90.707 Section 90.707... Program § 90.707 Test procedures. (a)(1) For small SI engines subject to the provisions of this subpart, the prescribed test procedures are specified in subpart E of this part. (2) The Administrator may, on...

  15. 40 CFR 86.425-78 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 19 2013-07-01 2013-07-01 false Test procedures. 86.425-78 Section 86... Later New Motorcycles, General Provisions § 86.425-78 Test procedures. (a) Motorcycle emission test procedures are found in subpart F. (b) The Administrator may prescribe emission test procedures for any...

  16. 40 CFR 86.425-78 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Test procedures. 86.425-78 Section 86... Later New Motorcycles, General Provisions § 86.425-78 Test procedures. (a) Motorcycle emission test procedures are found in subpart F. (b) The Administrator may prescribe emission test procedures for any...

  17. 40 CFR 86.425-78 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 19 2012-07-01 2012-07-01 false Test procedures. 86.425-78 Section 86... Later New Motorcycles, General Provisions § 86.425-78 Test procedures. (a) Motorcycle emission test procedures are found in subpart F. (b) The Administrator may prescribe emission test procedures for any...

  18. 40 CFR 86.884-5 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 20 2012-07-01 2012-07-01 false Test procedures. 86.884-5 Section 86... New Diesel Heavy-Duty Engines; Smoke Exhaust Test Procedure § 86.884-5 Test procedures. The procedures described in this and subsequent sections will be the test program to determine the conformity of engines...

  19. 40 CFR 600.111-93 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Test procedures. 600.111-93 Section... Emission Regulations for 1978 and Later Model Year Automobiles-Test Procedures § 600.111-93 Test procedures. (a) The test procedures to be followed for generation of the city fuel economy data are those...

  20. 40 CFR 600.111-08 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Test procedures. 600.111-08 Section... Emission Regulations for 1978 and Later Model Year Automobiles-Test Procedures § 600.111-08 Test procedures. This section provides test procedures for the FTP, highway, US06, SC03, and the cold temperature FTP...

  1. 40 CFR 600.111-80 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Test procedures. 600.111-80 Section... Emission Regulations for 1978 and Later Model Year Automobiles-Test Procedures § 600.111-80 Test procedures. (a) The test procedures to be followed for generation of the city fuel economy data are those...

  2. 40 CFR 86.884-5 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Test procedures. 86.884-5 Section 86... Heavy-Duty Engines; Smoke Exhaust Test Procedure § 86.884-5 Test procedures. The procedures described in this and subsequent sections will be the test program to determine the conformity of engines with the...

  3. 40 CFR 86.608-98 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Test procedures. 86.608-98 Section 86... New Light-Duty Vehicles, Light-Duty Trucks, and Heavy-Duty Vehicles § 86.608-98 Test procedures. (a) The prescribed test procedures are the Federal Test Procedure, as described in subpart B of this part...

  4. 40 CFR 86.608-98 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 20 2012-07-01 2012-07-01 false Test procedures. 86.608-98 Section 86... Auditing of New Light-Duty Vehicles, Light-Duty Trucks, and Heavy-Duty Vehicles § 86.608-98 Test procedures. (a) The prescribed test procedures are the Federal Test Procedure, as described in subpart B and/or...

  5. Technology Implementation Plan: Irradiation Testing and Qualification for Nuclear Thermal Propulsion Fuel

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harrison, Thomas J.; Howard, Richard H.; Rader, Jordan D.

    This document is a notional technology implementation plan (TIP) for the development, testing, and qualification of a prototypic fuel element to support design and construction of a nuclear thermal propulsion (NTP) engine, specifically its pre-flight ground test. This TIP outlines a generic methodology for the progression from non-nuclear out-of-pile (OOP) testing through nuclear in-pile (IP) testing, at operational temperatures, flows, and specific powers, of an NTP fuel element in an existing test reactor. Subsequent post-irradiation examination (PIE) will occur in existing radiological facilities. Further, the methodology is intended to be nonspecific with respect to fuel types and irradiation or examinationmore » facilities. The goals of OOP and IP testing are to provide confidence in the operational performance of fuel system concepts and provide data to program leadership for system optimization and fuel down-selection. The test methodology, parameters, collected data, and analytical results from OOP, IP, and PIE will be documented for reference by the NTP operator and the appropriate regulatory and oversight authorities. Final full-scale integrated testing would be performed separately by the reactor operator as part of the preflight ground test.« less

  6. Qualification test results for blue-red reflecting solar covers

    NASA Technical Reports Server (NTRS)

    Beauchamp, W. T.

    1994-01-01

    Recent market forces and design innovations have spurred the development of solar cell covers that significantly reduce the solar absorptance for a cell array. GaAs cells, using Ge as the substrate host material, can have a significantly higher output if the solar absorptance of the cell array is reduced. New optical coating design techniques have allowed the construction of covers that reflect the ultraviolet energy (below 350 nm) and the near infrared energy (above 900 nm) resulting in the beneficial reduction in absorptance. Recent modeling suggests three or more present output increase due to the lowered temperature with such a device. Within the last several months we have completed the testing of production samples of these new covers in a qualification series that included the usual environmental effects associated with the routine testing of solar cell covers and the combined effects of protons, electrons and solar UV as would be encountered in space. For the combined effects testing the samples were exposed to 300 sun days equivalent UV, 5 x 10(exp 14)/sq cm of 0.5 MeV protons and 10(exp 15)/sq cm of 1.0 MeV electrons. Measurements of the reflectance, transmission, emittance and other appropriate parameters were made before and after the testing. As measured by the averaged transmission over the cell operating band, the change in transmission for the samples was less than or about equal to 1 percent. The details of the testing and the results in terms of transmission, reflectance and emittance are discussed in the paper.

  7. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Test procedure: Static fractionator test. 53.64 Section 53.64 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Performance Characteristics of Class II Equivalent Methods for PM2.5 § 53.64 Test procedure: Static...

  8. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Static fractionator test. 53.64 Section 53.64 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Performance Characteristics of Class II Equivalent Methods for PM2.5 § 53.64 Test procedure: Static...

  9. Qualification and calibration tests of detector modules for the CMS Pixel Phase 1 upgrade

    NASA Astrophysics Data System (ADS)

    Zhu, D.; Backhaus, M.; Berger, P.; Meinhard, M.; Starodumov, A.; Tavolaro, V.

    2018-01-01

    In high energy particle physics, accelerator- and detector-upgrades always go hand in hand. The instantaneous luminosity of the Large Hadron Collider will increase to up to L = 2×1034cm-2s-1 during Run 2 until 2023. In order to cope with such luminosities, the pixel detector of the CMS experiment has been replaced early 2017. The so-called CMS Pixel phase 1 upgrade detector consists of 1184 modules with new design. An important production step is the module qualification and calibration, ensuring their proper functionality within the detector. This paper summarizes the qualification and calibration tests and results of modules used in the innermost two detector layers with focus on methods using module-internal calibration signals. Extended characterizations on pixel level such as electronic noise and bump bond connectivity, optimization of operational parameters, sensor quality and thermal stress resistance were performed using a customized setup with controlled environment. It could be shown that the selected modules have on average 0.55‰ ± 0.01‰ defective pixels and that all performance parameters stay within their specifications.

  10. PULSE COMBUSTOR DESIGN QUALIFICATION TEST AND CLEAN COAL FEEDSTOCK TEST - VOLUME I AND VOLUME II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Unknown

    For this Cooperative Agreement, the pulse heater module is the technology envelope for an indirectly heated steam reformer. The field of use of the steam reformer pursuant to this Cooperative Agreement with DOE is for the processing of sub-bituminous coals and lignite. The main focus is the mild gasification of such coals for the generation of both fuel gas and char--for the steel industry is the main focus. An alternate market application for the substitution of metallurgical coke is also presented. This project was devoted to qualification of a 253-tube pulse heater module. This module was designed, fabricated, installed, instrumentedmore » and tested in a fluidized bed test facility. Several test campaigns were conducted. This larger heater is a 3.5 times scale-up of the previous pulse heaters that had 72 tubes each. The smaller heater has been part of previous pilot field testing of the steam reformer at New Bern, North Carolina. The project also included collection and reduction of mild gasification process data from operation of the process development unit (PDU). The operation of the PDU was aimed at conditions required to produce char (and gas) for the Northshore Steel Operations. Northshore Steel supplied the coal for the process unit tests.« less

  11. Secondary Waste Cast Stone Waste Form Qualification Testing Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Westsik, Joseph H.; Serne, R. Jeffrey

    2012-09-26

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is being constructed to treat the 56 million gallons of radioactive waste stored in 177 underground tanks at the Hanford Site. The WTP includes a pretreatment facility to separate the wastes into high-level waste (HLW) and low-activity waste (LAW) fractions for vitrification and disposal. The LAW will be converted to glass for final disposal at the Integrated Disposal Facility (IDF). Cast Stone – a cementitious waste form, has been selected for solidification of this secondary waste stream after treatment in the ETF. The secondary-waste Cast Stone waste form must be acceptablemore » for disposal in the IDF. This secondary waste Cast Stone waste form qualification testing plan outlines the testing of the waste form and immobilization process to demonstrate that the Cast Stone waste form can comply with the disposal requirements. Specifications for the secondary-waste Cast Stone waste form have not been established. For this testing plan, Cast Stone specifications are derived from specifications for the immobilized LAW glass in the WTP contract, the waste acceptance criteria for the IDF, and the waste acceptance criteria in the IDF Permit issued by the State of Washington. This testing plan outlines the testing needed to demonstrate that the waste form can comply with these waste form specifications and acceptance criteria. The testing program must also demonstrate that the immobilization process can be controlled to consistently provide an acceptable waste form product. This testing plan also outlines the testing needed to provide the technical basis for understanding the long-term performance of the waste form in the disposal environment. These waste form performance data are needed to support performance assessment analyses of the long-term environmental impact of the secondary-waste Cast Stone waste form in the IDF« less

  12. Adaptive graph-based multiple testing procedures

    PubMed Central

    Klinglmueller, Florian; Posch, Martin; Koenig, Franz

    2016-01-01

    Multiple testing procedures defined by directed, weighted graphs have recently been proposed as an intuitive visual tool for constructing multiple testing strategies that reflect the often complex contextual relations between hypotheses in clinical trials. Many well-known sequentially rejective tests, such as (parallel) gatekeeping tests or hierarchical testing procedures are special cases of the graph based tests. We generalize these graph-based multiple testing procedures to adaptive trial designs with an interim analysis. These designs permit mid-trial design modifications based on unblinded interim data as well as external information, while providing strong family wise error rate control. To maintain the familywise error rate, it is not required to prespecify the adaption rule in detail. Because the adaptive test does not require knowledge of the multivariate distribution of test statistics, it is applicable in a wide range of scenarios including trials with multiple treatment comparisons, endpoints or subgroups, or combinations thereof. Examples of adaptations are dropping of treatment arms, selection of subpopulations, and sample size reassessment. If, in the interim analysis, it is decided to continue the trial as planned, the adaptive test reduces to the originally planned multiple testing procedure. Only if adaptations are actually implemented, an adjusted test needs to be applied. The procedure is illustrated with a case study and its operating characteristics are investigated by simulations. PMID:25319733

  13. 40 CFR 205.54 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Test procedures. 205.54 Section 205.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.54 Test procedures. The procedures described...

  14. 49 CFR 383.131 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... provide standardized scoring sheets for the skills tests, as well as standardized driving instructions for... 49 Transportation 5 2010-10-01 2010-10-01 false Test procedures. 383.131 Section 383.131... STANDARDS; REQUIREMENTS AND PENALTIES Tests § 383.131 Test procedures. (a) Driver information manuals...

  15. 40 CFR 203.3 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Test procedures. 203.3 Section 203.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS LOW-NOISE-EMISSION PRODUCTS § 203.3 Test procedures. (a) The applicant shall test or cause his product to be tested...

  16. 40 CFR 203.3 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Test procedures. 203.3 Section 203.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS LOW-NOISE-EMISSION PRODUCTS § 203.3 Test procedures. (a) The applicant shall test or cause his product to be tested...

  17. 40 CFR 94.506 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures. 94.506 Section 94.506... Test procedures. (a)(1) For engines subject to the provisions of this subpart, the prescribed test...) The Administrator may, on the basis of a written application by a manufacturer, prescribe test...

  18. 40 CFR 91.507 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures. 91.507 Section 91.507... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Manufacturer Production Line Testing Program § 91.507 Test procedures. (a)(1) For marine SI engines subject to the provisions of this subpart, the prescribed test...

  19. 40 CFR 91.507 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Test procedures. 91.507 Section 91.507... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Manufacturer Production Line Testing Program § 91.507 Test procedures. (a)(1) For marine SI engines subject to the provisions of this subpart, the prescribed test...

  20. 40 CFR 203.3 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Test procedures. 203.3 Section 203.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS LOW-NOISE-EMISSION PRODUCTS § 203.3 Test procedures. (a) The applicant shall test or cause his product to be tested...

  1. 40 CFR 204.54 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Test procedures. 204.54 Section 204.54... STANDARDS FOR CONSTRUCTION EQUIPMENT Portable Air Compressors § 204.54 Test procedures. (a) General. This... which the test is conducted. (b) Test site description. The location for measuring noise employed during...

  2. RL10A-3-3B high mixture ratio qualification program

    NASA Technical Reports Server (NTRS)

    Vogel, T.; Varella, D.; Smith, C.

    1987-01-01

    The results of the high mixture ratio qualification testing of the RL10 engine for the Shuttle/Centaur program are presented. The objective of the engine qualification test was to demonstrate the suitability of the RL10A-3-3B engine for space vehicle flight by subjecting it to the testing specified in RL10A-3-3B Model Specification Number 2295 dated February 1986. The applicable section of the specification is presented. Due to payload volume advantages which can be achieved by increasing the operating mixture ratio of the RL10, a decision was made to qualify the engine to run at a higher mixture ratio. A program was created to qualify the RL10 engine for operation at 15,000 pounds thrust and a nominal 6.0 to 1 mixture ratio. This model of the engine was designated the RL10A-3-3B. The qualification program included three test series as follows: (1) hardware durability and limits test in which the engine completed 23 firings and 4605.7 seconds with 1588.7 seconds at less than 6.6 mixture ratio; (2) preliminary qualification test in which the engine completed 26 firings and 5750 seconds; and (3) qualification test in which the engine completed 26 hot firings and 5693.4 seconds with 905.9 seconds at 6.7 mixture ratio. Several changes in engine hardware were required for operation of the RL10A-3-3B engine in the Space Shuttle which include a duel pressure switch ignition, an oxidizer flow control, and helium plumbing changes.

  3. High-Flux, High-Temperature Thermal Vacuum Qualification Testing of a Solar Receiver Aperture Shield

    NASA Technical Reports Server (NTRS)

    Kerslake, Thomas W.; Mason, Lee S.; Strumpf, Hal J.

    1997-01-01

    equilibrium temperature of 2072 K was achieved. The aperture shield sustained no visible damage as a result of the exposures. This paper describes the aperture shield thermal-vacuum qualification test program including the test article, test facility, procedures, data collection, test success criteria, results and conclusions.

  4. Reliability and Qualification of Hardware to Enhance the Mission Assurance of JPL/NASA Projects

    NASA Technical Reports Server (NTRS)

    Ramesham, Rajeshuni

    2010-01-01

    Packaging Qualification and Verification (PQV) and life testing of advanced electronic packaging, mechanical assemblies (motors/actuators), and interconnect technologies (flip-chip), platinum temperature thermometer attachment processes, and various other types of hardware for Mars Exploration Rover (MER)/Mars Science Laboratory (MSL), and JUNO flight projects was performed to enhance the mission assurance. The qualification of hardware under extreme cold to hot temperatures was performed with reference to various project requirements. The flight like packages, assemblies, test coupons, and subassemblies were selected for the study to survive three times the total number of expected temperature cycles resulting from all environmental and operational exposures occurring over the life of the flight hardware including all relevant manufacturing, ground operations, and mission phases. Qualification/life testing was performed by subjecting flight-like qualification hardware to the environmental temperature extremes and assessing any structural failures, mechanical failures or degradation in electrical performance due to either overstress or thermal cycle fatigue. Experimental flight qualification test results will be described in this presentation.

  5. 16 CFR § 1610.6 - Test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Test procedure. § 1610.6 Section § 1610.6... FLAMMABILITY OF CLOTHING TEXTILES The Standard § 1610.6 Test procedure. The test procedure is divided into two... according to paragraph (b)(1) of this section. (a) Step 1—Testing in the original state. (1) Tests shall be...

  6. Test procedures and data input techniques for skid testing.

    DOT National Transportation Integrated Search

    1974-01-01

    The purpose of this report is to describe the system for obtaining and handling skid data, including skid testing procedures and data input procedures. While all testing devices used in Virginia are covered (other than the British portable tester), t...

  7. 16 CFR 1631.4 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedure. 1631.4 Section 1631.4... SURFACE FLAMMABILITY OF SMALL CARPETS AND RUGS (FF 2-70) The Standard § 1631.4 Test procedure. (a) Apparatus—(1) Test chamber. The test chamber shall consist of an open top hollow cube made of noncombustible...

  8. 16 CFR 1630.4 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedure. 1630.4 Section 1630.4... SURFACE FLAMMABILITY OF CARPETS AND RUGS (FF 1-70) The Standard § 1630.4 Test procedure. (a) Apparatus—(1) Test chamber. The test chamber shall consist of an open top hollow cube made of noncombustible material...

  9. 40 CFR 610.65 - Other test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Other test procedures. 610.65 Section 610.65 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Special Test Procedures § 610.65 Other...

  10. 40 CFR 610.64 - Track test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 30 2014-07-01 2014-07-01 false Track test procedures. 610.64 Section 610.64 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Special Test Procedures § 610.64 Track...

  11. 40 CFR 610.65 - Other test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 30 2014-07-01 2014-07-01 false Other test procedures. 610.65 Section 610.65 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Special Test Procedures § 610.65 Other...

  12. 40 CFR 610.65 - Other test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 31 2013-07-01 2013-07-01 false Other test procedures. 610.65 Section 610.65 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Special Test Procedures § 610.65 Other...

  13. 40 CFR 610.65 - Other test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 31 2012-07-01 2012-07-01 false Other test procedures. 610.65 Section 610.65 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Special Test Procedures § 610.65 Other...

  14. 40 CFR 610.65 - Other test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Other test procedures. 610.65 Section 610.65 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Special Test Procedures § 610.65 Other...

  15. 16 CFR 1510.4 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedure. 1510.4 Section 1510.4... REQUIREMENTS FOR RATTLES § 1510.4 Test procedure. Place the test fixture shown in Figure 1 on a horizontal plane surface. Under its own weight and in a non-compressed state apply any portion of the test sample...

  16. 16 CFR 1615.4 - Test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Test procedure. 1615.4 Section 1615.4... FLAMMABILITY OF CHILDREN'S SLEEPWEAR: SIZES 0 THROUGH 6X (FF 3-71) The Standard § 1615.4 Test procedure. (a) Apparatus—(1) Test chamber. The test chamber shall be a steel cabinet with inside dimensions of 32.9 cm...

  17. 16 CFR 1615.4 - Test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Test procedure. 1615.4 Section 1615.4... FLAMMABILITY OF CHILDREN'S SLEEPWEAR: SIZES 0 THROUGH 6X (FF 3-71) The Standard § 1615.4 Test procedure. (a) Apparatus—(1) Test chamber. The test chamber shall be a steel cabinet with inside dimensions of 32.9 cm. (12...

  18. Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Engineering Test Report: AMSU-A1 METSAT Instrument (S/N 105) Qualification, Level Vibration Tests of December 1998 (S/O 605445, OC-419)

    NASA Technical Reports Server (NTRS)

    Heffner, R. J.

    1998-01-01

    This is the Engineering Test Report, AMSU-AL METSAT Instrument (S/N 105) Qualification Level Vibration Tests of December 1998 (S/0 605445, OC-419), for the Integrated Advanced Microwave Sounding Unit-A (AMSU-A).

  19. 48 CFR 2909.506 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Procedures. 2909.506 Section 2909.506 Federal Acquisition Regulations System DEPARTMENT OF LABOR ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 2909.506 Procedures. (a) If a...

  20. Historical flight qualifications of space nuclear systems

    NASA Astrophysics Data System (ADS)

    Bennett, Gary L.

    1997-01-01

    An overview is presented of the qualification programs for the general-purpose heat source radioisotope thermoelectric generators (GPHS-RTGs) as developed for the Galileo and Ulysses missions; the SNAP-10A space reactor; the Nuclear Engine for Rocket Vehicle Applications (NERVA); the F-1 chemical rocket engine used on the Saturn-V Apollo lunar missions; and the Space Shuttle Main Engines (SSMEs). Some similarities and contrasts between the qualification testing employed on these five programs will be noted. One common thread was that in each of these successful programs there was an early focus on component and subsystem tests to uncover and correct problems.

  1. Qualification of silicon pore optics

    NASA Astrophysics Data System (ADS)

    Wille, Eric; Bavdaz, Marcos; Fransen, Sebastiaan; Collon, Maximilien; Ackermann, Marcelo; Guenther, Ramses; Chatbi, Abdelhakim; Vacanti, Giuseppe; Vervest, Mark; van Baren, Coen; Haneveld, Jeroen; Riekerink, Mark Olde; Koelewijn, Arenda; Kampf, Dirk; Zuknik, Karl-Heinz; Reutlinger, Arnd

    2014-07-01

    Silicon Pore Optics (SPO) are the enabling technology for ESA's second large class mission in the Cosmic Vision programme. As for every space hardware, a critical qualification process is required to verify the suitability of the SPO mirror modules surviving the launch loads and maintaining their performance in the space environment. We present recent design modifications to further strengthen the mounting system (brackets and dowel pins) against mechanical loads. The progress of a formal qualification test campaign with the new mirror module design is shown. We discuss mechanical and thermal limitations of the SPO technology and provide recommendations for the mission design of the next X-ray Space Observatory.

  2. 40 CFR 89.408 - Post-test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Post-test procedures. 89.408 Section... Procedures § 89.408 Post-test procedures. (a) A hangup check is recommended at the completion of the last...) Record the post-test data specified in § 89.405(f). (e) For a valid test, the zero and span checks...

  3. 40 CFR 89.408 - Post-test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Post-test procedures. 89.408 Section... Procedures § 89.408 Post-test procedures. (a) A hangup check is recommended at the completion of the last...) Record the post-test data specified in § 89.405(f). (e) For a valid test, the zero and span checks...

  4. 40 CFR 89.408 - Post-test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Post-test procedures. 89.408 Section... Procedures § 89.408 Post-test procedures. (a) A hangup check is recommended at the completion of the last...) Record the post-test data specified in § 89.405(f). (e) For a valid test, the zero and span checks...

  5. 40 CFR 89.408 - Post-test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Post-test procedures. 89.408 Section... Procedures § 89.408 Post-test procedures. (a) A hangup check is recommended at the completion of the last...) Record the post-test data specified in § 89.405(f). (e) For a valid test, the zero and span checks...

  6. 40 CFR 89.408 - Post-test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Post-test procedures. 89.408 Section 89... Procedures § 89.408 Post-test procedures. (a) A hangup check is recommended at the completion of the last...) Record the post-test data specified in § 89.405(f). (e) For a valid test, the zero and span checks...

  7. Flight qualification of mortar-actuated parachute deployment systems

    NASA Technical Reports Server (NTRS)

    Pleasants, J. E.

    1975-01-01

    A brief discussion outlines background of mortar use in parachute deployment systems. A description of the system operation is presented. Effects of the environment on performance are discussed as well as the instrumentation needed to assess this performance. Power unit qualification and lot qualification for shear pins and cartridges is delineated. Functional mortar system tests are described. Finally, bridle deployment and parachute deployment are discussed.

  8. [Equipment qualification].

    PubMed

    Le Vacon, F

    2005-06-01

    The qualification of the equipment is a particularly important stage in the transfusional process. On the one hand, of many standards such as those of certification or that of accreditation require it, just as the good transfusional practices; in addition, the practices of steps of quality assurance develop this aspect. Indeed, the absence of the realization of this qualification of material having an influence on the finished product, can lead to an error in the product. This qualification passes by various stages of which some are major such as the drafting of the schedule of conditions, the drafting of the operational protocol of qualification, the decision made for the setting in routine. Finally so that this qualification takes all its dimensions it is necessary to carry out methods linked to the international system of measurement. Moreover certain questions after reflexions must find response such as which unit to check, and only this one, the equipment is - it a complex one, is there a maintenance contract? Once all these elements taken into account, the questions having found their answer, the operational protocol will then well be built, the decisions of settings in routine could be done and the sets of the finalized stages.

  9. 23 CFR 635.110 - Licensing and qualification of contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.110 Licensing and qualification... licensing contractors, who may bid for, be awarded, or perform Federal-aid highway contracts, shall be... of a bid or before the bid may be considered for award of a contract. This, however, is not intended...

  10. 40 CFR 86.884-5 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... New Diesel Heavy-Duty Engines; Smoke Exhaust Test Procedure § 86.884-5 Test procedures. The procedures..., or eliminating smoke emissions and to uncontrolled engines. (b) The test is designed to determine the opacity of smoke in exhaust emissions during those engine operating conditions which tend to promote smoke...

  11. 40 CFR 86.884-5 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... New Diesel Heavy-Duty Engines; Smoke Exhaust Test Procedure § 86.884-5 Test procedures. The procedures..., or eliminating smoke emissions and to uncontrolled engines. (b) The test is designed to determine the opacity of smoke in exhaust emissions during those engine operating conditions which tend to promote smoke...

  12. 40 CFR 86.884-5 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... New Diesel Heavy-Duty Engines; Smoke Exhaust Test Procedure § 86.884-5 Test procedures. The procedures..., or eliminating smoke emissions and to uncontrolled engines. (b) The test is designed to determine the opacity of smoke in exhaust emissions during those engine operating conditions which tend to promote smoke...

  13. 40 CFR 91.607 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures. 91.607 Section 91.607... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Selective Enforcement Auditing Regulations § 91.607 Test procedures. (a)(1) For marine SI engines subject to the provisions of this subpart, the prescribed test...

  14. 16 CFR 1301.7 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedures. 1301.7 Section 1301.7 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS BAN OF UNSTABLE REFUSE BINS § 1301.7 Test procedures. (a) The refuse bin shall be tested by applying forces as...

  15. Australian Qualifications Framework Lower-Level Qualifications: Pathways to Where for Young People?

    ERIC Educational Resources Information Center

    Stanwick, John

    2005-01-01

    This study investigates where certificate I and II qualifications lead young people aged 15-24 years in terms of employment and further study. A prime motivation for young people undertaking these qualifications is to facilitate transition into the labour market. These qualifications are aimed at developing basic vocational skills or preparatory…

  16. [The role of the basophil activation test (BAT) in qualification for specific immunotherapy with inhalant allergens].

    PubMed

    Bulanda, Małgorzata; Dyga, Wojciech; Rusinek, Barbara; Czarnobilska, Ewa

    Qualification for specific immunotherapy (SIT) according to the guidelines of the European Academy of Allergy and Clinical Immunology (EAACI) includes medical history, skin prik tests (SPT) and/or measuring the concentration of sIgE. It is necessary to perform additional diagnostic tests in case of discrepancies between the history and the results of SPT/sIgE or differences between SPT and sIgE. Basophil activation test (BAT) assesses the expression of activation markers of these cells, eg. CD63 and CD203c after stimulation. The aim of our study was to evaluate the usefulness of BAT in the qualification for the SIT in comparison to the SPT and sIgE and in case of discrepancies between the results of SPT and sIgE. The study included 30 patients with allergic rhinitis (AR) caused by allergy to house dust mite (Dermatophagoides pteronyssinus, Dp) or birch pollen qualified for SIT. All patients had SPT, sIgE and BAT determination. The group of patients with allergy to birch was a control group for Dp allergic and vice versa. BAT with CD63 antigen expression was performed using a Flow2CAST test. Basophils were stimulated with allergen preparation (50, 500, and 5000 SBU/ml concentrations). BAT results were expressed as a stimulation index (SI). For optimal concentrations of 50 and 500 SBU/ml parameters comparing BAT to SPT and sIgE as the gold standards were consecutively: sensitivity 82-100% and 93-100%, specificity 50-94% and 47-89%, positive predictive value 65- 94% and 61-87%, negative predictive value 86-100% and 93-100%. Correlation BAT - SPT and BAT - sIgE ranged within 0.59 to 0.84 and 0.51 to 0.72. BAT was helpful in 2 of 30 patients with incompatible results of SPT and sIgE. Optimal concentrations for basophil stimulation are 50 and 500 SBU/ ml. BAT may be useful diagnostic tool in the qualification for the SIT in case of discrepancies between the results of SPT and sIgE.

  17. 46 CFR 164.009-15 - Test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Test procedure. 164.009-15 Section 164.009-15 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Noncombustible Materials for Merchant Vessels § 164.009-15 Test procedure. (a) General. Paragraphs (b) through (k) of this section contain the test procedures for each material...

  18. 40 CFR 63.694 - Testing methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 11 2014-07-01 2014-07-01 false Testing methods and procedures. 63.694....694 Testing methods and procedures. (a) This section specifies the testing methods and procedures... this subpart, the testing methods and procedures are specified in paragraph (b) of this section. (2) To...

  19. 40 CFR 53.43 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedures. 53.43 Section 53.43... PM10 § 53.43 Test procedures. (a) Sampling effectiveness—(1) Technical definition. The ratio (expressed... or filters to the mass concentration of particles of the same size approaching the sampler. (2) Test...

  20. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Test procedure. 33.37 Section 33.37 Mineral... MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements § 33.37 Test procedure. (a) Roof drilling: Drilling shall be done in friable strata, similar to the...

  1. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Test procedure. 33.37 Section 33.37 Mineral... MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements § 33.37 Test procedure. (a) Roof drilling: Drilling shall be done in friable strata, similar to the...

  2. 40 CFR 53.43 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Test procedures. 53.43 Section 53.43... PM10 § 53.43 Test procedures. (a) Sampling effectiveness—(1) Technical definition. The ratio (expressed... or filters to the mass concentration of particles of the same size approaching the sampler. (2) Test...

  3. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Test procedure. 33.37 Section 33.37 Mineral... MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements § 33.37 Test procedure. (a) Roof drilling: Drilling shall be done in friable strata, similar to the...

  4. AMS-02 Cryocooler Baseline Configuration and Engineering Model Qualification Test Results

    NASA Technical Reports Server (NTRS)

    Banks, Stuart; Breon, Susan; Shirey, Kimberly

    2003-01-01

    Four Sunpower M87N Stirling-cycle cryocoolers will be used to extend the lifetime of the Alpha Magnetic Spectrometer-02 (AMS-02) experiment. The cryocoolers will be mounted to the AMS-02 vacuum case using a structure that will thermally and mechanically decouple the cryocooler from the vacuum case while providing compliance to allow force attenuation using a passive balancer system. The cryocooler drive is implemented using a 60Hz pulse duration modulated square wave. Details of the testing program, mounting assembly and drive scheme will be presented. AMS-02 is a state-of-the-art particle physics detector containing a large superfluid helium-cooled superconducting magnet. Highly sensitive detector plates inside the magnet measure a particle s speed, momentum, charge, and path. The AMS-02 experiment, which will be flown as an attached payload on the International Space Station, will study the properties and origin of cosmic particles and nuclei including antimatter and dark matter. Two engineering model cryocoolers have been under test at NASA Goddard since November 2001. Qualification testing of the engineering model cryocooler bracket assembly is near completion. Delivery of the flight cryocoolers to Goddard is scheduled for September 2003.

  5. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Test procedures. 474.4 Section 474.4 Energy DEPARTMENT OF...; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... Schedule and Urban Dynamometer Driving Schedule test cycles at 40 CFR parts 86 and 600. (b) The “Special...

  6. Are Current SEE Test Procedures Adequate for Modern Devices and Electronics Technologies?

    NASA Technical Reports Server (NTRS)

    LaBel, Kenneth A.; Cohn, Lewis M.; Ladbury, Ray

    2008-01-01

    Believe it or not, this has been a simplistic look at starting a checklist for SEE testing. Given a memory that has 68 operating modes, when a SEU occurs that changes the mode, just how do you determine what's going on? Laser and microbeam tests can help, but not easily for modern packaged devices. Expanding this approach to other more complex devices such as ADCs or processors as well as analog devices should be considered. The recommendation is to use the existing text standards as the starting point. Just make your own checklist for the device/technology/issues being considered. At HEART 2007, we presented some of the burgeoning challenges associated with single event effect(SEE) testing of modern commercial memories: a) Package, device complexity, test fixture, and data analysis issues were discussed; b) "Complete" SEE Characterization would take 15 years; c) Qualification test costs have a greater than 4 times increase over the last decade. In this talk, we continue to explore the roles of technology with an emphasis on the existing SEE Test Procedures and some of the concerns related to modern devices. The primary objective of the briefing is to provide some overarching guidance concerning the many considerations involved in the formulation of a SEE test plan provided in a " Checklist" format.we note that there is no such thing as a complete check list and that the best approach is to develop a flexible test plan that takes into account the device type and functions, the device technology, circuit and package design, and, of course, test facility and beam characteristics.

  7. 40 CFR 51.357 - Test procedures and standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Test procedures and standards. 51.357... Requirements § 51.357 Test procedures and standards. Written test procedures and pass/fail standards shall be established and followed for each model year and vehicle type included in the program. (a) Test procedure...

  8. 40 CFR 89.406 - Pre-test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Pre-test procedures. 89.406 Section 89...) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...

  9. 40 CFR 89.406 - Pre-test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Pre-test procedures. 89.406 Section 89...) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...

  10. 40 CFR 89.406 - Pre-test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Pre-test procedures. 89.406 Section 89...) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...

  11. 40 CFR 89.406 - Pre-test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Pre-test procedures. 89.406 Section 89...) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...

  12. 40 CFR 89.406 - Pre-test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Pre-test procedures. 89.406 Section 89...) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...

  13. Design, Qualification, and On Orbit Performance of the CALIPSO Aerosol Lidar Transmitter

    NASA Technical Reports Server (NTRS)

    Hovis, Floyd E.; Witt, Greg; Sullivan, Edward T.; Le, Khoa; Weimer, Carl; Applegate, Jeff; Luck, William S., Jr.; Verhapen, Ron; Cisewski, Michael S.

    2007-01-01

    The laser transmitter for the CALIPSO aerosol lidar mission has been operating on orbit as planned since June 2006. This document discusses the optical and laser system design and qualification process that led to this success. Space-qualifiable laser design guidelines included the use of mature laser technologies, the use of alignment sensitive resonator designs, the development and practice of stringent contamination control procedures, the operation of all optical components at appropriately derated levels, and the proper budgeting for the space-qualification of the electronics and software.

  14. Overview of Materials Qualification Needs for Metal Additive Manufacturing

    NASA Astrophysics Data System (ADS)

    Seifi, Mohsen; Salem, Ayman; Beuth, Jack; Harrysson, Ola; Lewandowski, John J.

    2016-03-01

    This overview highlights some of the key aspects regarding materials qualification needs across the additive manufacturing (AM) spectrum. AM technology has experienced considerable publicity and growth in the past few years with many successful insertions for non-mission-critical applications. However, to meet the full potential that AM has to offer, especially for flight-critical components (e.g., rotating parts, fracture-critical parts, etc.), qualification and certification efforts are necessary. While development of qualification standards will address some of these needs, this overview outlines some of the other key areas that will need to be considered in the qualification path, including various process-, microstructure-, and fracture-modeling activities in addition to integrating these with lifing activities targeting specific components. Ongoing work in the Advanced Manufacturing and Mechanical Reliability Center at Case Western Reserve University is focusing on fracture and fatigue testing to rapidly assess critical mechanical properties of some titanium alloys before and after post-processing, in addition to conducting nondestructive testing/evaluation using micro-computerized tomography at General Electric. Process mapping studies are being conducted at Carnegie Mellon University while large area microstructure characterization and informatics (EBSD and BSE) analyses are being conducted at Materials Resources LLC to enable future integration of these efforts via an Integrated Computational Materials Engineering approach to AM. Possible future pathways for materials qualification are provided.

  15. Historical flight qualifications of space nuclear systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bennett, G.L.

    1997-01-01

    An overview is presented of the qualification programs for the general-purpose heat source radioisotope thermoelectric generators (GPHS-RTGs) as developed for the Galileo and Ulysses missions; the SNAP-10A space reactor; the Nuclear Engine for Rocket Vehicle Applications (NERVA); the F-1 chemical rocket engine used on the Saturn-V Apollo lunar missions; and the Space Shuttle Main Engines (SSMEs). Some similarities and contrasts between the qualification testing employed on these five programs will be noted. One common thread was that in each of these successful programs there was an early focus on component and subsystem tests to uncover and correct problems. {copyright} {italmore » 1997 American Institute of Physics.}« less

  16. Safety validation test equipment operation

    NASA Astrophysics Data System (ADS)

    Kurosaki, Tadaaki; Watanabe, Takashi

    1992-08-01

    An overview of the activities conducted on safety validation test equipment operation for materials used for NASA manned missions is presented. Safety validation tests, such as flammability, odor, offgassing, and so forth were conducted in accordance with NASA-NHB-8060.1C using test subjects common with those used by NASA, and the equipment used were qualified for their functions and performances in accordance with NASDA-CR-99124 'Safety Validation Test Qualification Procedures.' Test procedure systems were established by preparing 'Common Procedures for Safety Validation Test' as well as test procedures for flammability, offgassing, and odor tests. The test operation organization chaired by the General Manager of the Parts and Material Laboratory of NASDA (National Space Development Agency of Japan) was established, and the test leaders and operators in the organization were qualified in accordance with the specified procedures. One-hundred-one tests had been conducted so far by the Parts and Material Laboratory according to the request submitted by the manufacturers through the Space Station Group and the Safety and Product Assurance for Manned Systems Office.

  17. 40 CFR 53.23 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedures. 53.23 Section 53.23... Methods SO2, CO, O3, and NO2 § 53.23 Test procedures. (a) Range—(1) Technical definition. Nominal minimum... specified at the lower and upper range limits in concentration units, for example, 0-0.5 p/m. (2) Test...

  18. 40 CFR 53.23 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Test procedures. 53.23 Section 53.23... Methods SO2, CO, O3, and NO2 § 53.23 Test procedures. (a) Range—(1) Technical definition. Nominal minimum... specified at the lower and upper range limits in concentration units, for example, 0-0.5 p/m. (2) Test...

  19. Synthesis of Sine-on-Random vibration profiles for accelerated life tests based on fatigue damage spectrum equivalence

    NASA Astrophysics Data System (ADS)

    Angeli, Andrea; Cornelis, Bram; Troncossi, Marco

    2018-03-01

    In many real life environments, mechanical and electronic systems are subjected to vibrations that may induce dynamic loads and potentially lead to an early failure due to fatigue damage. Thus, qualification tests by means of shakers are advisable for the most critical components in order to verify their durability throughout the entire life cycle. Nowadays the trend is to tailor the qualification tests according to the specific application of the tested component, considering the measured field data as reference to set up the experimental campaign, for example through the so called "Mission Synthesis" methodology. One of the main issues is to define the excitation profiles for the tests, that must have, besides the (potentially scaled) frequency content, also the same damage potential of the field data despite being applied for a limited duration. With this target, the current procedures generally provide the test profile as a stationary random vibration specified by a Power Spectral Density (PSD). In certain applications this output may prove inadequate to represent the nature of the reference signal, and the procedure could result in an unrealistic qualification test. For instance when a rotating part is present in the system the component under analysis may be subjected to Sine-on-Random (SoR) vibrations, namely excitations composed of sinusoidal contributions superimposed to random vibrations. In this case, the synthesized test profile should preserve not only the induced fatigue damage but also the deterministic components of the environmental vibration. In this work, the potential advantages of a novel procedure to synthesize SoR profiles instead of PSDs for qualification tests are presented and supported by the results of an experimental campaign.

  20. 49 CFR 399.209 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Test procedures. 399.209 Section 399.209 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY... STANDARDS Step, Handhold, and Deck Requirements for Commercial Motor Vehicles § 399.209 Test procedures. (a...

  1. Qualification of UHF Antenna for Extreme Martian Thermal Environments

    NASA Technical Reports Server (NTRS)

    Ramesham, Rajeshuni; Amaro, Luis R.; Brown, Paula R.; Usiskin, Robert

    2013-01-01

    The purpose of this development was to validate the use of the external Rover Ultra High Frequency (RUHF) antenna for space under extreme thermal environments to be encountered during the surface operations of the Mars Science Laboratory (MSL) mission. The antenna must survive all ground operations plus the nominal 670 Martian sol mission that includes summer and winter seasons of the Mars thermal environment.The qualification effort was to verify that the RUHF antenna design and its bonding and packaging processes are adequate to survive the harsh environmental conditions. The RUHF is a quadrifilar helix antenna mounted on the MSL Curiosity rover deck. The main components of the RUHF antenna are the helix structure, feed cables, and hybrid coupler, and the high-power termination load. In the case of MSL rover externally mounted hardware, not only are the expected thermal cycle depths severe, but there are temperature offsets between the Mars summer and winter seasons. The total number of temperature cycles needed to be split into two regimes of summer cycles and winter cycles. The qualification test was designed to demonstrate a survival life of three times more than all expected ground testing, plus a nominal 670 Martian sol missions. Baseline RF tests and a visual inspection were performed prior to the start of the qualification test. Functional RF tests were performed intermittently during chamber breaks over the course of the qualification test. For the RF return loss measurements, the antenna was tested in a controlled environment outside the thermal chamber with a vector network analyzer that was calibrated over the antenna s operational frequency range. A total of 2,010 thermal cycles were performed. Visual inspection showed a dulling of the solder material. This change will not affect the performance of the antenna. No other changes were observed. RF tests were performed on the RUHF helix antenna, hybrid, and load after the 2,010 qualification cycles test

  2. Qualification of a rapid readout biological indicator with moist heat sterilization.

    PubMed

    McCormick, Patrick; Finocchario, Catherine; Manchester, Robert; Glasgow, Louis; Costanzo, Stephen

    2003-01-01

    Biological indicators are recognized as an important component in the validation and routine monitoring of moist heat (steam) sterilization processes. Due to the need to allow for the recovery and outgrowth of test organisms that may have been sub-lethally injured, between 2-5 days of incubation are typically required before the outcome of sterilization processing can be reliably interpreted. Rapid readout biological indicators that incorporate the response of a heat resistant enzyme provide a means for assessing the efficacy of moist heat sterilization within hours of processing. This study describes the qualification of the 3M Attest 1292 Rapid Readout Biological Indicator with moist heat sterilization according to the procedures described in the PDA Technical Report No. 33, "Evaluation, Validation and Implementation of New Microbiological Testing Methods".

  3. 40 CFR 63.945 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 11 2014-07-01 2014-07-01 false Test methods and procedures. 63.945...) National Emission Standards for Surface Impoundments § 63.945 Test methods and procedures. (a) Procedure...) The test shall be conducted in accordance with the procedures specified in Method 21 of 40 CFR part 60...

  4. Application Guidelines for Quality Assurance Procedures for Hybrid Microcircuits.

    DTIC Science & Technology

    1983-03-01

    INSPECTION LIMITS SYMBOL TEST CONDITIONS UNITS SUBGROUP 6 TC = -55 DEGREES C AVI0 1 SAME AS SUBGROUP 5 -0.1 5 Vpp VOS SAME AS SUBGROUP 4 50 m%LC V0 2 ... 1 . Line Certification 2 . Fabrication Techniques and Material Qualification Procedures 3. Design Guidelines e. Application Guidelines. Items a through... 1 2 . GENERAL ................... ......... ................. 3 2.1 Summary of documents generated ........................ 3 2.2 Contract objectives

  5. 40 CFR 90.411 - Post-test analyzer procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Post-test analyzer procedures. 90.411... Test Procedures § 90.411 Post-test analyzer procedures. (a) Perform a HC hang-up check within 60...), the test is void. (d) Read and record the post-test data specified in § 90.405(e). (e) For a valid...

  6. 40 CFR 90.411 - Post-test analyzer procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Post-test analyzer procedures. 90.411... Test Procedures § 90.411 Post-test analyzer procedures. (a) Perform a HC hang-up check within 60...), the test is void. (d) Read and record the post-test data specified in § 90.405(e). (e) For a valid...

  7. 40 CFR 90.411 - Post-test analyzer procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Post-test analyzer procedures. 90.411... Test Procedures § 90.411 Post-test analyzer procedures. (a) Perform a HC hang-up check within 60...), the test is void. (d) Read and record the post-test data specified in § 90.405(e). (e) For a valid...

  8. 40 CFR 90.411 - Post-test analyzer procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Post-test analyzer procedures. 90.411... Test Procedures § 90.411 Post-test analyzer procedures. (a) Perform a HC hang-up check within 60...), the test is void. (d) Read and record the post-test data specified in § 90.405(e). (e) For a valid...

  9. 40 CFR 90.411 - Post-test analyzer procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Post-test analyzer procedures. 90.411... Test Procedures § 90.411 Post-test analyzer procedures. (a) Perform a HC hang-up check within 60...), the test is void. (d) Read and record the post-test data specified in § 90.405(e). (e) For a valid...

  10. 40 CFR 80.51 - Vehicle test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 16 2011-07-01 2011-07-01 false Vehicle test procedures. 80.51 Section...) REGULATION OF FUELS AND FUEL ADDITIVES Reformulated Gasoline § 80.51 Vehicle test procedures. The test sequence applicable when augmenting the emission models through vehicle testing is as follows: (a) Prepare...

  11. 40 CFR 80.51 - Vehicle test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 17 2014-07-01 2014-07-01 false Vehicle test procedures. 80.51 Section...) REGULATION OF FUELS AND FUEL ADDITIVES Reformulated Gasoline § 80.51 Vehicle test procedures. The test sequence applicable when augmenting the emission models through vehicle testing is as follows: (a) Prepare...

  12. 40 CFR 61.304 - Test methods and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false Test methods and procedures. 61.304... Emissions From Benzene Transfer Operations § 61.304 Test methods and procedures. (a) The procedures for... testing equipment shall be prepared and installed as specified in the appropriate test methods. (2) The...

  13. 40 CFR 61.304 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Test methods and procedures. 61.304... Emissions From Benzene Transfer Operations § 61.304 Test methods and procedures. (a) The procedures for... testing equipment shall be prepared and installed as specified in the appropriate test methods. (2) The...

  14. 40 CFR 61.304 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 9 2014-07-01 2014-07-01 false Test methods and procedures. 61.304... Emissions From Benzene Transfer Operations § 61.304 Test methods and procedures. (a) The procedures for... testing equipment shall be prepared and installed as specified in the appropriate test methods. (2) The...

  15. 40 CFR 61.304 - Test methods and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Test methods and procedures. 61.304... Emissions From Benzene Transfer Operations § 61.304 Test methods and procedures. (a) The procedures for... testing equipment shall be prepared and installed as specified in the appropriate test methods. (2) The...

  16. 40 CFR 61.304 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false Test methods and procedures. 61.304... Emissions From Benzene Transfer Operations § 61.304 Test methods and procedures. (a) The procedures for... testing equipment shall be prepared and installed as specified in the appropriate test methods. (2) The...

  17. 40 CFR 86.1227-96 - Test procedures; overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Test procedures; overview. 86.1227-96... Emission Test Procedures for New Gasoline-Fueled, Natural Gas-Fueled, Liquefied Petroleum Gas-Fueled and Methanol-Fueled Heavy-Duty Vehicles § 86.1227-96 Test procedures; overview. (a) The overall test consists...

  18. 33 CFR 155.710 - Qualifications of person in charge.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... available to the PIC on the tankship at all times during the transfer or cargo-tank cleaning; and (iii) Is... Transfer Personnel, Procedures, Equipment, and Records § 155.710 Qualifications of person in charge. (a) On... the vessel, or the person who arranges and hires a person to be in charge either of a transfer of...

  19. Qualifications for Tenure: The Legal Definitions. ASHE Annual Meeting Paper.

    ERIC Educational Resources Information Center

    Lee, Barbara A.

    The issue of qualifications for tenure is examined with attention to judicial tests for qualification in lawsuits in which faculty alleged that negative tenure decisions were infected with illegal discrimination. The focus is the degree to which a faculty plaintiff must demonstrate at the first stage of the lawsuit that he or she was qualified for…

  20. Kiel sensors for the EPD instrument on-board Solar Orbiter - An overview of the qualification and acceptance test campaigns in phase D

    NASA Astrophysics Data System (ADS)

    Ravanbakhsh, A.; Kulkarni, S. R.; Panitzsch, L.; L Richards, M.; Munoz Hernandez, A.; Seimetz, L.; Elftmann, R.; Mahesh, Y.; Boden, S.; Boettcher, S. I.; Kulemzin, A.; Martin-Garcia, C.; Prieto, M.; Rodriguez-Pacheco, J.; Sanchez Prieto, S.; Schuster, B.; Steinhagen, J.; Tammen, J.; Wimmer-Schweingruber, R. F.

    2016-12-01

    Solar Orbiter is ESA's next solar and heliospheric mission which is planned to be launched in October 2018. The Energetic Particle Detector (EPD) on board on Solar Orbiter will provide key measurements for the Solar Orbiter science objectives. The EPD suite consists of four sensors; STEP, SIS, EPT and HET. The University of Kiel in Germany is responsible for the design, development, and building of STEP, and the two identical units EPT-HET 1 and EPT-HET 2. ESA's Solar Orbiter will explore the heliosphere at heliocentric distances between 0.28AU and 0.9AU and with inclination up to 38deg with respect to the Sun's equator. The spacecraft uses a heat shield to protect the bus and externally mounted instruments from the solar flux at the close distances to the sun. All three EPD-Kiel units are mounted externally but in different positions on the spacecraft outer deck. Although being protected by the spacecraft heat shield from high solar flux, EPT-HET1 and EPT-HET-2 as well as STEP experience a harsh environmental condition during the course of the mission. In addition due to the highly demanding science requirements, the qualification and acceptance test requirements of these externally mounted units are quite challenging. In this paper we present the development status of the EPT-HET 1, EPT-HET 2 and STEP sensors focusing on the activities performed in phase D and the qualification and acceptance test campaigns. The main objective of these test campaigns is to ensure and demonstrate the compatibility between the scientific requirements and the harsh environment expected during the mission. This paper includes the results summary of the environmental tests on the EPT-HET and STEP Proto-Qualification Models (PQMs) as well as Proto-Flight Models (PFMs). Only an adequate selection of environmental qualification and acceptance campaigns will guarantee the success of the scientific space missions.

  1. Dialogic Spaces: A Critical Policy Development Perspective of Educational Leadership Qualifications

    ERIC Educational Resources Information Center

    Smith, Déirdre; Kelly, Darron; Allard, Carson

    2017-01-01

    The critical exploration of policy development processes employed to construct leadership qualifications is the focus of this inquiry. This exploration is made through specific application of the necessary conditions of Habermasian "practical discourse" to current dialogic procedures used to develop policies for principal, supervisory…

  2. Nuclear Technology. Course 28: Welding Inspection. Module 28-5, Qualifications.

    ERIC Educational Resources Information Center

    Espy, John

    This fifth in a series of ten modules for a course titled Welding Inspection describes qualification requirements for welding procedures and welders and the role of the nuclear quality assurance/quality control technician. The module follows a typical format that includes the following sections: (1) introduction, (2) module prerequisites, (3)…

  3. Dynamic Environmental Qualification Techniques.

    DTIC Science & Technology

    1981-12-01

    environments peculiar to military operations and requirements. numerous dynamic qualification test methods have been established. It was the purpose...requires the achievement of the highest practicable degree in the standard- ization of items, materials and engineering practices within the...standard is described as "A document that established engineering and technical requirements for processes, pro’cedures, practices and methods that have

  4. EUCLID/NISP GRISM qualification model AIT/AIV campaign: optical, mechanical, thermal and vibration tests

    NASA Astrophysics Data System (ADS)

    Caillat, A.; Costille, A.; Pascal, S.; Rossin, C.; Vives, S.; Foulon, B.; Sanchez, P.

    2017-09-01

    Dark matter and dark energy mysteries will be explored by the Euclid ESA M-class space mission which will be launched in 2020. Millions of galaxies will be surveyed through visible imagery and NIR imagery and spectroscopy in order to map in three dimensions the Universe at different evolution stages over the past 10 billion years. The massive NIR spectroscopic survey will be done efficiently by the NISP instrument thanks to the use of grisms (for "Grating pRISMs") developed under the responsibility of the LAM. In this paper, we present the verification philosophy applied to test and validate each grism before the delivery to the project. The test sequence covers a large set of verifications: optical tests to validate efficiency and WFE of the component, mechanical tests to validate the robustness to vibration, thermal tests to validate its behavior in cryogenic environment and a complete metrology of the assembled component. We show the test results obtained on the first grism Engineering and Qualification Model (EQM) which will be delivered to the NISP project in fall 2016.

  5. Role of Wind Tunnels and Computer Codes in the Certification and Qualification of Rotorcraft for Flight in Forecast Icing

    NASA Technical Reports Server (NTRS)

    Flemming, Robert J.; Britton, Randall K.; Bond, Thomas H.

    1994-01-01

    The cost and time to certify or qualify a rotorcraft for flight in forecast icing has been a major impediment to the development of ice protection systems for helicopter rotors. Development and flight test programs for those aircraft that have achieved certification or qualification for flight in icing conditions have taken many years, and the costs have been very high. NASA, Sikorsky, and others have been conducting research into alternative means for providing information for the development of ice protection systems, and subsequent flight testing to substantiate the air-worthiness of a rotor ice protection system. Model rotor icing tests conducted in 1989 and 1993 have provided a data base for correlation of codes, and for the validation of wind tunnel icing test techniques. This paper summarizes this research, showing test and correlation trends as functions of cloud liquid water content, rotor lift, flight speed, and ambient temperature. Molds were made of several of the ice formations on the rotor blades. These molds were used to form simulated ice on the rotor blades, and the blades were then tested in a wind tunnel to determine flight performance characteristics. These simulated-ice rotor performance tests are discussed in the paper. The levels of correlation achieved and the role of these tools (codes and wind tunnel tests) in flight test planning, testing, and extension of flight data to the limits of the icing envelope are discussed. The potential application of simulated ice, the NASA LEWICE computer, the Sikorsky Generalized Rotor Performance aerodynamic computer code, and NASA Icing Research Tunnel rotor tests in a rotorcraft certification or qualification program are also discussed. The correlation of these computer codes with tunnel test data is presented, and a procedure or process to use these methods as part of a certification or qualification program is introduced.

  6. 40 CFR 60.675 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.675... Mineral Processing Plants § 60.675 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in...

  7. 40 CFR 60.644 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.644... Gas Processing: SO2 Emissions § 60.644 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test...

  8. 40 CFR 60.503 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false Test methods and procedures. 60.503... Terminals § 60.503 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of...

  9. 40 CFR 60.503 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.503... Terminals § 60.503 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of...

  10. 40 CFR 60.503 - Test methods and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false Test methods and procedures. 60.503... Terminals § 60.503 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of...

  11. 40 CFR 60.503 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Test methods and procedures. 60.503... Terminals § 60.503 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of...

  12. 40 CFR 60.503 - Test methods and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Test methods and procedures. 60.503... Terminals § 60.503 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of...

  13. Environmental Qualification of a Single-Crystal Silicon Mirror for Spaceflight Use

    NASA Technical Reports Server (NTRS)

    Hagopian, John; Chambers, John; Rohrback. Scott; Bly, Vincent; Morell, Armando; Budinoff, Jason

    2013-01-01

    This innovation is the environmental qualification of a single-crystal silicon mirror for spaceflight use. The single-crystal silicon mirror technology is a previous innovation, but until now, a mirror of this type has not been qualified for spaceflight use. The qualification steps included mounting, gravity change measurements, vibration testing, vibration- induced change measurements, thermal cycling, and testing at the cold operational temperature of 225 K. Typical mirrors used for cold applications for spaceflight instruments include aluminum, beryllium, glasses, and glass-like ceramics. These materials show less than ideal behavior after cooldown. Single-crystal silicon has been demonstrated to have the smallest change due to temperature change, but has not been spaceflight-qualified for use. The advantage of using a silicon substrate is with temperature stability, since it is formed from a stress-free single crystal. This has been shown in previous testing. Mounting and environmental qualification have not been shown until this testing.

  14. Thermal Protection System Development, Testing and Qualification

    NASA Astrophysics Data System (ADS)

    Venkatapathy, Ethiraj; Arnold, James; Laub, B.; Hartman, G. J.

    The science community currently has interest in planetary entry probe missions to improve our understanding of the atmospheres of Saturn and Venus [1,2]. As in the case of the Galileo entry probe, such data are critical to the understanding of not only the individual planets but also to further knowledge regarding the formation of the solar system. It is believed that Saturn probes to depths corresponding to 10 bars will be sufficient [1] to provide the desired scientific data. The heating rates for the "shallow" Saturn probes and Venus are in the range of 2 - 5KW/cm2 . It is clear that new, mid-density Thermal Protection System (TPS) materials for such probes can be mission-enabling for mass efficiency [3] and also make the use of smaller vehicles possible from advancements in scientific instrumentation [4]. Past consideration of new Jovian multiprobe missions has been considered problematic without the Giant Planet Arcjet Facility that was used to qualify Carbon Phenolic for the Galileo Probe. This paper describes emerging TPS technology and the proposed use of an affordable, small 5 MW arc jet that can be used for TPS development in test gases appropriate for the aforementioned, new planetary probe applications. Emerging TPS technologies of interest include a mid-density, chopped molded carbon phenolic (CMCP) material around 0.8g/cc and a densified variant of phenolic impregnated carbon ablator (PICA) around 0.5g/cc. The small 5 MW arc jet facility, called the Development Arcjet Facility (DAF) and the methodology of testing TPS, both based on previous work, are discussed. Finally, the applications to Earth entry appropriate to speeds greater than lunar return (11km/s) are discussed as will facility-to-facility validation using air as a test gas. The use of other facilities for development, qualification and certification of TPS for Saturn and Venus is also discussed. [1] Atreya, S. K., et. al. Formation of Giant Planets and Their Atmospheres: Entry Probes for

  15. 40 CFR 53.63 - Test procedure: Wind tunnel inlet aspiration test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Test procedure: Wind tunnel inlet... Testing Performance Characteristics of Class II Equivalent Methods for PM2.5 § 53.63 Test procedure: Wind... extracts an ambient aerosol at elevated wind speeds. This wind tunnel test uses a single-sized, liquid...

  16. 40 CFR 87.62 - Test procedure (propulsion engines).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Test procedure (propulsion engines). 87.62 Section 87.62 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) Definitions. Test Procedures § 87.62 Test procedure (propulsion engines). Link to an...

  17. 40 CFR 401.13 - Test procedures for measurement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 29 2011-07-01 2009-07-01 true Test procedures for measurement. 401.13 Section 401.13 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS GENERAL PROVISIONS § 401.13 Test procedures for measurement. The test procedures for...

  18. The Effect of Armed Forces Qualification Test Score on Mental Health Outcome Following Mild Traumatic Brain Injury

    DTIC Science & Technology

    2012-04-04

    Brain reserve and dementia: a systematic review . Psychol Med 2006;36:441–54. 39. Valenzuela MJ: Brain reserve and the prevention of dementia. Curr Opin...Forces Qualification Test (AFQT) score. A retrospective review was conducted to identify those with postinjury mental health disorders (ICD-9-CM codes...studies suggest the relationship between intelligence and mental health outcome may be more robust in those with MTBI, because the injury itself may

  19. 40 CFR 133.104 - Sampling and test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Sampling and test procedures. 133.104 Section 133.104 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS SECONDARY TREATMENT REGULATION § 133.104 Sampling and test procedures. (a) Sampling and test procedures for...

  20. 40 CFR 133.104 - Sampling and test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Sampling and test procedures. 133.104 Section 133.104 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS SECONDARY TREATMENT REGULATION § 133.104 Sampling and test procedures. (a) Sampling and test procedures for...

  1. 40 CFR 133.104 - Sampling and test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Sampling and test procedures. 133.104 Section 133.104 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS SECONDARY TREATMENT REGULATION § 133.104 Sampling and test procedures. (a) Sampling and test procedures for...

  2. 14 CFR 34.5 - Special test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... EXHAUST EMISSION REQUIREMENTS FOR TURBINE ENGINE POWERED AIRPLANES General Provisions § 34.5 Special test... or operator of aircraft or aircraft engines, approve test procedures for any aircraft or aircraft engine that is not susceptible to satisfactory testing by the procedures set forth herein. Prior to...

  3. 40 CFR 91.408 - Pre-test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Pre-test procedures. 91.408 Section 91...) CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Gaseous Exhaust Test Procedures § 91.408 Pre-test... accordance with § 91.117. (b) Engine pre-test preparation. (1) Drain and charge the fuel tank(s) with the...

  4. 40 CFR 91.408 - Pre-test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Pre-test procedures. 91.408 Section 91...) CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Gaseous Exhaust Test Procedures § 91.408 Pre-test... accordance with § 91.117. (b) Engine pre-test preparation. (1) Drain and charge the fuel tank(s) with the...

  5. 40 CFR 91.408 - Pre-test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Pre-test procedures. 91.408 Section 91...) CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Gaseous Exhaust Test Procedures § 91.408 Pre-test... accordance with § 91.117. (b) Engine pre-test preparation. (1) Drain and charge the fuel tank(s) with the...

  6. 40 CFR 91.408 - Pre-test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Pre-test procedures. 91.408 Section 91...) CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Gaseous Exhaust Test Procedures § 91.408 Pre-test... accordance with § 91.117. (b) Engine pre-test preparation. (1) Drain and charge the fuel tank(s) with the...

  7. 40 CFR 91.408 - Pre-test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Pre-test procedures. 91.408 Section 91...) CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Gaseous Exhaust Test Procedures § 91.408 Pre-test... accordance with § 91.117. (b) Engine pre-test preparation. (1) Drain and charge the fuel tank(s) with the...

  8. Commercial Parts Technology Qualification Processes

    NASA Technical Reports Server (NTRS)

    Cooper, Mark S.

    2013-01-01

    Many high-reliability systems, including space systems, use selected commercial parts (including Plastic Encapsulated Microelectronics or PEMs) for unique functionality, small size, low weight, high mechanical shock resistance, and other factors. Predominantly this usage is subjected to certain 100% tests (typically called screens) and certain destructive tests usually (but not always) performed on the flight lot (typically called qualification tests). Frequently used approaches include those documented in EEE-INST-002 and JPL DocID62212 (which are sometimes modified by the particular aerospace space systems manufacturer). In this study, approaches from these documents and several space systems manufacturers are compared to approaches from a launch systems manufacturer (SpaceX), an implantable medical electronics manufacturer (Medtronics), and a high-reliability transport system process (automotive systems). In the conclusions section, these processes are outlined for all of these cases and presented in tabular form. Then some simple comparisons are made. In this introduction section, the PEM technology qualification process is described, as documented in EEE-INST-002 (written by the Goddard Space Flight Center, GSFC), as well as the somewhat modified approach employed at the Jet Propulsion Laboratory (JPL). Approaches used at several major NASA contractors are also described

  9. Test Operations Procedure (TOP) 08-2-188 Chemical Point Detector Vapor Testing

    DTIC Science & Technology

    2018-04-27

    Evaluation Command 6617 Aberdeen Boulevard Aberdeen Proving Ground, MD 21005-5001 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT NUMBER(S...AND EVALUATION COMMAND TEST OPERATIONS PROCEDURE *Test Operations Procedure 08-2-188 27 April 2018 DTIC AD No. CHEMICAL POINT DETECTOR VAPOR...188 27 April 2018 2 1. SCOPE. This Test Operations Procedure (TOP), which has been endorsed by the Test and Evaluation Capabilities and

  10. Qualification Testing of Engineering Camera and Platinum Resistance Thermometer (PRT) Sensors for Mars Science Laboratory (MSL) Project under Extreme Temperatures to Assess Reliability and to Enhance Mission Assurance

    NASA Technical Reports Server (NTRS)

    Ramesham, Rajeshuni; Maki, Justin N.; Cucullu, Gordon C.

    2008-01-01

    Package Qualification and Verification (PQV) of advanced electronic packaging and interconnect technologies and various other types of qualification hardware for the Mars Exploration Rover/Mars Science Laboratory flight projects has been performed to enhance the mission assurance. The qualification of hardware (Engineering Camera and Platinum Resistance Thermometer, PRT) under extreme cold temperatures has been performed with reference to various project requirements. The flight-like packages, sensors, and subassemblies have been selected for the study to survive three times (3x) the total number of expected temperature cycles resulting from all environmental and operational exposures occurring over the life of the flight hardware including all relevant manufacturing, ground operations and mission phases. Qualification has been performed by subjecting above flight-like qual hardware to the environmental temperature extremes and assessing any structural failures or degradation in electrical performance due to either overstress or thermal cycle fatigue. Experiments of flight like hardware qualification test results have been described in this paper.

  11. 40 CFR 264.1034 - Test methods and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Test methods and procedures. 264.1034... Air Emission Standards for Process Vents § 264.1034 Test methods and procedures. (a) Each owner or operator subject to the provisions of this subpart shall comply with the test methods and procedures...

  12. 40 CFR 264.1063 - Test methods and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Test methods and procedures. 264.1063... Air Emission Standards for Equipment Leaks § 264.1063 Test methods and procedures. (a) Each owner or operator subject to the provisions of this subpart shall comply with the test methods and procedures...

  13. 40 CFR 401.13 - Test procedures for measurement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 28 2010-07-01 2010-07-01 true Test procedures for measurement. 401.13... AND STANDARDS GENERAL PROVISIONS § 401.13 Test procedures for measurement. The test procedures for measurement which are prescribed at part 136 of this chapter shall apply to expressions of pollutant amounts...

  14. 16 CFR § 1615.4 - Test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Test procedure. § 1615.4 Section § 1615.4... FLAMMABILITY OF CHILDREN'S SLEEPWEAR: SIZES 0 THROUGH 6X (FF 3-71) The Standard § 1615.4 Test procedure. (a) Apparatus—(1) Test chamber. The test chamber shall be a steel cabinet with inside dimensions of 32.9 cm...

  15. AF Ni-Cd cell qualification program

    NASA Technical Reports Server (NTRS)

    Hall, Steve; Brown, Harry; Collins, G.; Hwang, Warren

    1994-01-01

    The present status of the USAF NiCd cell qualification program, which is underway at the Naval Surface Warfare Center-Crane Division, is summarized. The following topics are discussed: overview; background; purpose; stress tests; results for super Ni-Cd; results for SAFT cells; GPS stress test; GPS simulated orbit; and results for gates cells. The discussion is presented in viewgraph format.

  16. 14 CFR Appendix F to Part 23 - Test Procedure

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Test Procedure F Appendix F to Part 23...—Test Procedure Part I—Acceptable Test Procedure for Self-Extinguishing Materials for Showing Compliance With §§ 23.853, 23.855, and 23.1359 Acceptable test procedure for self-extinguishing materials for...

  17. 14 CFR Appendix F to Part 23 - Test Procedure

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Test Procedure F Appendix F to Part 23...—Test Procedure Part I—Acceptable Test Procedure for Self-Extinguishing Materials for Showing Compliance With §§ 23.853, 23.855, and 23.1359 Acceptable test procedure for self-extinguishing materials for...

  18. 48 CFR 309.407-3 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Procedures. 309.407-3 Section 309.407-3 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 309.407-3 Procedures. (a) Investigation and referral. When an...

  19. 48 CFR 409.407-3 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Procedures. 409.407-3 Section 409.407-3 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension and Ineligibility 409.407-3 Procedures. (a) Investigation and referral. When a...

  20. 49 CFR 1114.24 - Depositions; procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Depositions; procedures. 1114.24 Section 1114.24... OF TRANSPORTATION RULES OF PRACTICE EVIDENCE; DISCOVERY Discovery § 1114.24 Depositions; procedures... objections made at the time of the examination to the qualifications of the officer taking the deposition, or...

  1. 49 CFR 1114.24 - Depositions; procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 8 2011-10-01 2011-10-01 false Depositions; procedures. 1114.24 Section 1114.24... OF TRANSPORTATION RULES OF PRACTICE EVIDENCE; DISCOVERY Discovery § 1114.24 Depositions; procedures... objections made at the time of the examination to the qualifications of the officer taking the deposition, or...

  2. 5 CFR 339.303 - Examination procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Examination procedures. 339.303 Section... QUALIFICATION DETERMINATIONS Medical Examinations § 339.303 Examination procedures. (a) When an agency orders or offers a medical examination under this subpart, it must inform the applicant or employee in writing of...

  3. 42 CFR 61.34 - Qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Qualifications. 61.34 Section 61.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Service Fellowships § 61.34 Qualifications. Scholastic and other qualifications shall be...

  4. 42 CFR 61.34 - Qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Qualifications. 61.34 Section 61.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Service Fellowships § 61.34 Qualifications. Scholastic and other qualifications shall be...

  5. 42 CFR 61.34 - Qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Qualifications. 61.34 Section 61.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Service Fellowships § 61.34 Qualifications. Scholastic and other qualifications shall be...

  6. 42 CFR 61.34 - Qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Qualifications. 61.34 Section 61.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Service Fellowships § 61.34 Qualifications. Scholastic and other qualifications shall be...

  7. 42 CFR 61.34 - Qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Qualifications. 61.34 Section 61.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Service Fellowships § 61.34 Qualifications. Scholastic and other qualifications shall be...

  8. 40 CFR 63.925 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 11 2014-07-01 2014-07-01 false Test methods and procedures. 63.925...) National Emission Standards for Containers § 63.925 Test methods and procedures. (a) Procedures for... be conducted in accordance with the procedures specified in Method 21 of 40 CFR part 60, appendix A...

  9. 47 CFR 54.410 - Certification and Verification of Consumer Qualification for Lifeline.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Certification and Verification of Consumer... § 54.410 Certification and Verification of Consumer Qualification for Lifeline. (a) Certification of... within that calendar year. (b) Self-certifications. After income certification procedures are implemented...

  10. 42 CFR 493.1455 - Standard; Clinical consultant qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Standard; Clinical consultant qualifications. 493.1455 Section 493.1455 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND... Testing Laboratories Performing High Complexity Testing § 493.1455 Standard; Clinical consultant...

  11. 42 CFR 493.1417 - Standard; Clinical consultant qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Standard; Clinical consultant qualifications. 493.1417 Section 493.1417 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND... Testing Laboratories Performing Moderate Complexity Testing § 493.1417 Standard; Clinical consultant...

  12. 42 CFR 493.1443 - Standard; Laboratory director qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Standard; Laboratory director qualifications. 493.1443 Section 493.1443 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND... Testing Laboratories Performing High Complexity Testing § 493.1443 Standard; Laboratory director...

  13. 42 CFR 493.1443 - Standard; Laboratory director qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Standard; Laboratory director qualifications. 493.1443 Section 493.1443 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND... Testing Laboratories Performing High Complexity Testing § 493.1443 Standard; Laboratory director...

  14. 48 CFR 436.603 - Collecting data on and appraising firms' qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Collecting data on and... Architect-Engineer Service 436.603 Collecting data on and appraising firms' qualifications. (a) HCA's which....603. (b) The procedures shall include a list of names, addresses, and phone numbers of offices or...

  15. 48 CFR 436.603 - Collecting data on and appraising firms' qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Collecting data on and... Architect-Engineer Service 436.603 Collecting data on and appraising firms' qualifications. (a) HCA's which....603. (b) The procedures shall include a list of names, addresses, and phone numbers of offices or...

  16. 40 CFR 86.1360-2007 - Supplemental emission test; test cycle and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Supplemental emission test; test cycle... ENGINES (CONTINUED) Emission Regulations for New Otto-Cycle and Diesel Heavy-Duty Engines; Gaseous and Particulate Exhaust Test Procedures § 86.1360-2007 Supplemental emission test; test cycle and procedures. The...

  17. 40 CFR 63.905 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 11 2014-07-01 2014-07-01 false Test methods and procedures. 63.905...) National Emission Standards for Tanks-Level 1 § 63.905 Test methods and procedures. (a) Procedure for... be conducted in accordance with the procedures specified in Method 21 of 40 CFR part 60, appendix A...

  18. 40 CFR 86.1360 - Supplemental emission test; test cycle and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Supplemental emission test; test cycle and procedures. 86.1360 Section 86.1360 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Exhaust Test Procedures for Heavy-duty...

  19. 40 CFR 60.2922 - How do I conduct the initial and annual performance test?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 26A of appendix A of this part must be used. (ii) The post-test moisture removal procedure described... performance test? 60.2922 Section 60.2922 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Qualification Performance Testing § 60.2922 How do I conduct the initial and annual performance test? (a) All...

  20. 40 CFR 60.2922 - How do I conduct the initial and annual performance test?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 26A of appendix A of this part must be used. (ii) The post-test moisture removal procedure described... performance test? 60.2922 Section 60.2922 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Qualification Performance Testing § 60.2922 How do I conduct the initial and annual performance test? (a) All...

  1. 40 CFR 60.2922 - How do I conduct the initial and annual performance test?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 26A of appendix A of this part must be used. (ii) The post-test moisture removal procedure described... performance test? 60.2922 Section 60.2922 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Qualification Performance Testing § 60.2922 How do I conduct the initial and annual performance test? (a) All...

  2. 40 CFR 86.339-79 - Pre-test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Pre-test procedures. 86.339-79 Section... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.339-79 Pre-test procedures. (a) Allow a minimum of 30 minutes warm-up in the stand-by or operating mode prior...

  3. 40 CFR 86.339-79 - Pre-test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 19 2012-07-01 2012-07-01 false Pre-test procedures. 86.339-79 Section... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.339-79 Pre-test procedures. (a) Allow a minimum of 30 minutes warm-up in the stand-by or operating mode prior...

  4. 40 CFR 86.339-79 - Pre-test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 19 2013-07-01 2013-07-01 false Pre-test procedures. 86.339-79 Section... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.339-79 Pre-test procedures. (a) Allow a minimum of 30 minutes warm-up in the stand-by or operating mode prior...

  5. 40 CFR 86.339-79 - Pre-test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 18 2011-07-01 2011-07-01 false Pre-test procedures. 86.339-79 Section... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.339-79 Pre-test procedures. (a) Allow a minimum of 30 minutes warm-up in the stand-by or operating mode prior...

  6. Qualification and issues with space flight laser systems and components

    NASA Astrophysics Data System (ADS)

    Ott, Melanie N.; Coyle, D. B.; Canham, John S.; Leidecker, Henning W., Jr.

    2006-02-01

    The art of flight quality solid-state laser development is still relatively young, and much is still unknown regarding the best procedures, components, and packaging required for achieving the maximum possible lifetime and reliability when deployed in the harsh space environment. One of the most important issues is the limited and unstable supply of quality, high power diode arrays with significant technological heritage and market lifetime. Since Spectra Diode Labs Inc. ended their involvement in the pulsed array business in the late 1990's, there has been a flurry of activity from other manufacturers, but little effort focused on flight quality production. This forces NASA, inevitably, to examine the use of commercial parts to enable space flight laser designs. System-level issues such as power cycling, operational derating, duty cycle, and contamination risks to other laser components are some of the more significant unknown, if unquantifiable, parameters that directly effect transmitter reliability. Designs and processes can be formulated for the system and the components (including thorough modeling) to mitigate risk based on the known failures modes as well as lessons learned that GSFC has collected over the past ten years of space flight operation of lasers. In addition, knowledge of the potential failure modes related to the system and the components themselves can allow the qualification testing to be done in an efficient yet, effective manner. Careful test plan development coupled with physics of failure knowledge will enable cost effect qualification of commercial technology. Presented here will be lessons learned from space flight experience, brief synopsis of known potential failure modes, mitigation techniques, and options for testing from the system level to the component level.

  7. Qualification and Issues with Space Flight Laser Systems and Components

    NASA Technical Reports Server (NTRS)

    Ott, Melanie N.; Coyle, D. Barry; Canham, John S.; Leidecker, Henning W.

    2006-01-01

    The art of flight quality solid-state laser development is still relatively young, and much is still unknown regarding the best procedures, components, and packaging required for achieving the maximum possible lifetime and reliability when deployed in the harsh space environment. One of the most important issues is the limited and unstable supply of quality, high power diode arrays with significant technological heritage and market lifetime. Since Spectra Diode Labs Inc. ended their involvement in the pulsed array business in the late 1990's, there has been a flurry of activity from other manufacturers, but little effort focused on flight quality production. This forces NASA, inevitably, to examine the use of commercial parts to enable space flight laser designs. System-level issues such as power cycling, operational derating, duty cycle, and contamination risks to other laser components are some of the more significant unknown, if unquantifiable, parameters that directly effect transmitter reliability. Designs and processes can be formulated for the system and the components (including thorough modeling) to mitigate risk based on the known failures modes as well as lessons learned that GSFC has collected over the past ten years of space flight operation of lasers. In addition, knowledge of the potential failure modes related to the system and the components themselves can allow the qualification testing to be done in an efficient yet, effective manner. Careful test plan development coupled with physics of failure knowledge will enable cost effect qualification of commercial technology. Presented here will be lessons learned from space flight experience, brief synopsis of known potential failure modes, mitigation techniques, and options for testing from the system level to the component level.

  8. Qualification and Issues with Space Flight Laser Systems and Components

    NASA Technical Reports Server (NTRS)

    Ott, Melanie N.; Coyle, D. Barry; Canham, John S.; Leidecker, Henning W.

    2006-01-01

    The art of flight quality solid-state laser development is still relatively young, and much is still unknown regarding the best procedures, components, and packaging required for achieving the maximum possible lifetime and reliability when deployed in the harsh space environment. One of the most important issues is the limited and unstable supply of quality, high power diode arrays with significant technological heritage and market lifetime. Since Spectra Diode Labs Inc. ended their involvement in the pulsed array business in the late 199O's, there has been a flurry of activity from other manufacturers, but little effort focused on flight quality production. This forces NASA, inevitably, to examine the use of commercial parts to enable space flight laser designs. System-level issues such as power cycling, operational derating, duty cycle, and contamination risks to other laser components are some of the more significant unknown, if unquantifiable, parameters that directly effect transmitter reliability. Designs and processes can be formulated for the system and the components (including thorough modeling) to mitigate risk based on the known failures modes as well as lessons learned that GSFC has collected over the past ten years of space flight operation of lasers. In addition, knowledge of the potential failure modes related to the system and the components themselves can allow the qualification testing to be done in an efficient yet, effective manner. Careful test plan development coupled with physics of failure knowledge will enable cost effect qualification of commercial technology. Presented here will be lessons learned from space flight experience, brief synopsis of known potential failure modes, mitigation techniques, and options for testing from the system level to the component level.

  9. Space Shuttle Crawler Transporter Truck Shoe Qualification Tests and Analyses for Return-to-Flight

    NASA Technical Reports Server (NTRS)

    Margasahayam, Ravi N.; Meyer, Karl A.; Burton, Roy C.; Gosselin, Armand M.

    2005-01-01

    A vital element to Launch Complex 39 (LC39) and NASA's Kennedy Space Center (KSC) mobile launch transfer operation is a 3 million kilogram behemoth known as the Crawler Transporter (CT). Built in the 1960's, two CT's have accumulated over 1700+ miles each and have been used for the Apollo and the Space Shuttle programs. Recent observation of fatigue cracks on the CT shoes led to a comprehensive engineering, structural and metallurgical evaluation to assess the root cause that necessitated procurement of over 1000 new shoes. This paper documents the completed dynamic and compression tests on the old and new shoes respectively, so as to certify them for Space Shuttle's return-to-flight (RTF). Measured strain data from the rollout tests was used to develop stress/loading spectra and static equivalent load for qualification testing of the new shoes. Additionally, finite element analysis (FEA) was used to conduct sensitivity analyses of various contact parameters and structural characteristics for acceptance of new shoes.

  10. JOB BRIEFS, SELECTED FEDERAL JOBS--DUTIES, QUALIFICATION REQUIREMENTS, SAMPLE TEST QUESTIONS.

    ERIC Educational Resources Information Center

    Civil Service Commission, Washington, DC.

    INFORMATION ABOUT JOBS IN THE FEDERAL GOVERNMENT FOR PERSONS WITH LIMITED WORK EXPERIENCE OR EDUCATION IS PROVIDED. JOB BRIEFS DESCRIBING THE WORK, OPPORTUNITIES, NUMBER EMPLOYED, EMPLOYING AGENCIES, AND QUALIFICATIONS ARE GIVEN FOR (1) 19 WHITE COLLAR AND POST OFFICE JOBS SUCH AS CLERK-TYPIST, CLERK-STENOGRAPHER, NURSING ASSISTANT, SOIL…

  11. Building world-class microlithographic lens systems: optical material requirements and qualification methods

    NASA Astrophysics Data System (ADS)

    DeStefano, Paul R.; Michaloski, Paul F.

    1993-12-01

    Building successive generations of state-of-the-art wide field, sub-micron microlithographic lens systems dictates ever-tightening material tolerances that challenge glass manufacturers. This paper discusses the optical material needs for microlithographic lens systems and Tropel's in-house material qualification program. Material qualification is divided into three successive stages: (1) fluorescence testing to qualitatively analyze color center characteristics of the material; (2) homogeneity testing to determine the relative volumetric variations in index; and (3) absolute index testing at multiple wavelengths to determine the material's dispersion characteristics.

  12. Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moe, Wayne; Honma, George

    This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical informationmore » is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.« less

  13. Group 4: Instructor training and qualifications

    NASA Technical Reports Server (NTRS)

    Sessa, R.

    1981-01-01

    Each professional instructor or check airman used in LOFT training course should complete an FAA approved training course in the appropriate aircraft type. Instructors used in such courses need not be type-rated. If an instructor or check airman who is presently not line-qualified is used as a LOFT instructor, he or she should remain current in line-operational procedures by observing operating procedures from the jump seat on three typical line segments pr 90 days on the appropriate aircraft type. ("Line qualification" means completion as a flight crew member of at least three typical line segments per 90 days on the appropriate aircraft type.) The training should include the requirement of four hours of LOFT training, in lieu of actual aircraft training or line operating experience.

  14. 40 CFR 92.125 - Pre-test procedures and preconditioning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Pre-test procedures and... PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Test Procedures § 92.125 Pre-test procedures and preconditioning. (a) Locomotive testing. (1) Determine engine lubricating...

  15. 40 CFR 92.125 - Pre-test procedures and preconditioning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Pre-test procedures and preconditioning... PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Test Procedures § 92.125 Pre-test procedures and preconditioning. (a) Locomotive testing. (1) Determine engine lubricating...

  16. 40 CFR 92.125 - Pre-test procedures and preconditioning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Pre-test procedures and... PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Test Procedures § 92.125 Pre-test procedures and preconditioning. (a) Locomotive testing. (1) Determine engine lubricating...

  17. 40 CFR 92.125 - Pre-test procedures and preconditioning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Pre-test procedures and... PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Test Procedures § 92.125 Pre-test procedures and preconditioning. (a) Locomotive testing. (1) Determine engine lubricating...

  18. 40 CFR 92.125 - Pre-test procedures and preconditioning.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Pre-test procedures and... PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Test Procedures § 92.125 Pre-test procedures and preconditioning. (a) Locomotive testing. (1) Determine engine lubricating...

  19. 49 CFR 1546.409 - Integrity of screener tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... security supervisor, or other screening supervisor. The employee must be familiar with the procedures for... Qualifications When the Foreign Air Carrier Conducts Screening § 1546.409 Integrity of screener tests. (a... than one foreign air carrier or foreign air carrier uses a screening location, TSA may authorize an...

  20. Gluing interface qualification test results and gluing process development of the EUCLID near-infrared spectro-photometer optical assembly

    NASA Astrophysics Data System (ADS)

    Mottaghibonab, A.; Thiele, H.; Gubbini, E.; Dubowy, M.; Gal, C.; Mecsaci, A.; Gawlik, K.; Vongehr, M.; Grupp, F.; Penka, D.; Wimmer, C.; Bender, R.

    2016-07-01

    The Near Infrared Spectro-Photometer Optical assembly (NIOA) of EUCLID satellite requires high precision large lens holders with different lens materials, shapes and diameters. The aspherical lenses are glued into their separate CTE matched lens holder. The gluing of the lenses in their holder with 2K epoxy is selected as bonding process to minimize the stress in the lenses to achieve the required surface form error (SFE) performance (32nm) and lens position stability (+/-10μm) due to glue shrinkage. Adhesive shrinkage stress occurs during the glue curing at room temperature and operation in cryogenic temperatures, which might overstress the lens, cause performance loss, lens breakage or failure of the gluing interface. The selection of the suitable glue and required bonding parameters, design and qualification of the gluing interface, development and verification of the gluing process was a great challenge because of the low TRL and heritage of the bonding technology. The different material combinations (CaF2 to SS316L, LF5G15 and S-FTM16 to Titanium, SUPRASIL3001 to Invar M93), large diameter (168mm) and thin edge of the lenses, cryogenic nonoperational temperature (100K) and high performance accuracy of the lenses were the main design driver of the development. The different coefficients of thermal expansion (CTE) between lens and lens holder produce large local mechanical stress. As hygroscopic crystal calcium fluoride (CaF2) is very sensitive to moisture therefore an additional surface treatment of the gluing area is necessary. Extensive tests e.g glue handling and single lap shear tests are performed to select the suitable adhesive. Interface connection tests are performed to verify the feasibility of selected design (double pad design), injection channel, the roughness and treatment of the metal and lens interfaces, glue thickness, glue pad diameter and the gluing process. CTE and dynamic measurements of the glue, thermal cycling, damp- heat, connection

  1. Qualification testing of secondary sterilizable silver-zinc cells for use in the Jupiter atmospheric entry probe

    NASA Technical Reports Server (NTRS)

    Manzo, M. A.

    1981-01-01

    A series of qualification tests were run on the secondary, sterilizable silver oxide - zinc cell developed at the NASA Lewis Research Center to determine if the cell was capable of providing mission power requirements for the Jupiter atmospheric entry probe. The cells were tested for their ability to survive radiation at the levels predicted for the Jovian atmosphere with no loss of performance. Cell performance was evaluated under various temperature and loading conditions, and the cells were tested under various environmental conditions related to launch and to deceleration into the Jovian atmosphere. The cell performed acceptably except under the required loading at low temperatures. The cell was redesigned to improve low-temperature performance and energy density. The modified cells improved performance at all temperatures. Results of testing cells of both the original and modified designs are discussed.

  2. 40 CFR 1066.840 - Highway fuel economy test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Highway fuel economy test procedure... Highway fuel economy test procedure. This section describes the procedure for the highway fuel economy test (HFET). This test involves emission sampling and fuel economy measurement for certain vehicles as...

  3. 49 CFR Appendix C to Part 192 - Qualification of Welders for Low Stress Level Pipe

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Qualification of Welders for Low Stress Level Pipe C Appendix C to Part 192 Transportation Other Regulations Relating to Transportation (Continued.... C Appendix C to Part 192—Qualification of Welders for Low Stress Level Pipe I. Basic test. The test...

  4. 49 CFR Appendix C to Part 192 - Qualification of Welders for Low Stress Level Pipe

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Qualification of Welders for Low Stress Level Pipe C Appendix C to Part 192 Transportation Other Regulations Relating to Transportation (Continued.... C Appendix C to Part 192—Qualification of Welders for Low Stress Level Pipe I. Basic test. The test...

  5. 49 CFR Appendix C to Part 192 - Qualification of Welders for Low Stress Level Pipe

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Qualification of Welders for Low Stress Level Pipe C Appendix C to Part 192 Transportation Other Regulations Relating to Transportation (Continued.... C Appendix C to Part 192—Qualification of Welders for Low Stress Level Pipe I. Basic test. The test...

  6. 49 CFR Appendix C to Part 192 - Qualification of Welders for Low Stress Level Pipe

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Qualification of Welders for Low Stress Level Pipe C Appendix C to Part 192 Transportation Other Regulations Relating to Transportation (Continued.... C Appendix C to Part 192—Qualification of Welders for Low Stress Level Pipe I. Basic test. The test...

  7. 49 CFR Appendix C to Part 192 - Qualification of Welders for Low Stress Level Pipe

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Qualification of Welders for Low Stress Level Pipe C Appendix C to Part 192 Transportation Other Regulations Relating to Transportation (Continued.... C Appendix C to Part 192—Qualification of Welders for Low Stress Level Pipe I. Basic test. The test...

  8. 40 CFR 87.5 - Special test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Definitions. § 87.5 Special test procedures. Link to an amendment published at 77 FR 36381, June 18, 2012. The..., § 87.5 was removed, effective July 18, 2012. ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Special test procedures. 87.5 Section...

  9. High-frequency monopole sound source for anechoic chamber qualification

    NASA Astrophysics Data System (ADS)

    Saussus, Patrick; Cunefare, Kenneth A.

    2003-04-01

    Anechoic chamber qualification procedures require the use of an omnidirectional monopole sound source. Required characteristics for these monopole sources are explicitly listed in ISO 3745. Building a high-frequency monopole source that meets these characteristics has proved difficult due to the size limitations imposed by small wavelengths at high frequency. A prototype design developed for use in hemianechoic chambers employs telescoping tubes, which act as an inverse horn. This same design can be used in anechoic chambers, with minor adaptations. A series of gradually decreasing brass telescoping tubes is attached to the throat of a well-insulated high-frequency compression driver. Therefore, all of the sound emitted from the driver travels through the horn and exits through an opening of approximately 2.5 mm. Directivity test data show that this design meets all of the requirements set forth by ISO 3745.

  10. 46 CFR 61.40-10 - Test procedure details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Test procedure details. 61.40-10 Section 61.40-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC TESTS AND INSPECTIONS Design Verification and Periodic Testing of Vital System Automation § 61.40-10 Test procedure...

  11. 46 CFR 61.40-10 - Test procedure details.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Test procedure details. 61.40-10 Section 61.40-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC TESTS AND INSPECTIONS Design Verification and Periodic Testing of Vital System Automation § 61.40-10 Test procedure...

  12. 21 CFR 1010.13 - Special test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Special test procedures. 1010.13 Section 1010.13 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) RADIOLOGICAL HEALTH PERFORMANCE STANDARDS FOR ELECTRONIC PRODUCTS: GENERAL Alternate Test Procedures § 1010.13...

  13. 14 CFR Appendix F to Part 23 - Test Procedure

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Test Procedure F Appendix F to Part 23...—Test Procedure Acceptable test procedure for self-extinguishing materials for showing compliance with... as sandwich panels, may not be separated for a test. The specimen thickness must be no thicker than...

  14. Concentrator hot-spot testing, phase 1

    NASA Technical Reports Server (NTRS)

    Gonzalez, C. C.

    1987-01-01

    Results of a study to determine the hot-spot susceptibility of concentrator cells, to provide a hot-spot qualification test for concentrator modules, and to provide guidelines for reducing hot-spot susceptibility are presented. Hot-spot heating occurs in a photovoltaic module when the short-circuit current of a cell is lower than the string operating current forcing the cell into reverse bias with a concurrent power dissipation. Although the basis for the concentrator module hot-spot qualification test is the test developed for flat-plate modules, issues, such as providing cell illumination, introduce additional complexities into the testing procedure. The same general guidelines apply for protecting concentrator modules from hot-spot stressing as apply to flat-plate modules. Therefore, recommendations are made on the number of bypass diodes required per given number of series cells per module or source circuit. In addition, a new method for determining the cell temperature in the laboratory or in the field is discussed.

  15. 42 CFR 493.1469 - Standard: Cytology general supervisor qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Standard: Cytology general supervisor... Nonwaived Testing Laboratories Performing High Complexity Testing § 493.1469 Standard: Cytology general supervisor qualifications. The cytology general supervisor must be qualified to supervise cytology services...

  16. 42 CFR 493.1469 - Standard: Cytology general supervisor qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Standard: Cytology general supervisor... Nonwaived Testing Laboratories Performing High Complexity Testing § 493.1469 Standard: Cytology general supervisor qualifications. The cytology general supervisor must be qualified to supervise cytology services...

  17. 42 CFR 493.1469 - Standard: Cytology general supervisor qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 5 2014-10-01 2014-10-01 false Standard: Cytology general supervisor... Nonwaived Testing Laboratories Performing High Complexity Testing § 493.1469 Standard: Cytology general supervisor qualifications. The cytology general supervisor must be qualified to supervise cytology services...

  18. 42 CFR 493.1469 - Standard: Cytology general supervisor qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 5 2012-10-01 2012-10-01 false Standard: Cytology general supervisor... Nonwaived Testing Laboratories Performing High Complexity Testing § 493.1469 Standard: Cytology general supervisor qualifications. The cytology general supervisor must be qualified to supervise cytology services...

  19. 42 CFR 493.1469 - Standard: Cytology general supervisor qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 5 2013-10-01 2013-10-01 false Standard: Cytology general supervisor... Nonwaived Testing Laboratories Performing High Complexity Testing § 493.1469 Standard: Cytology general supervisor qualifications. The cytology general supervisor must be qualified to supervise cytology services...

  20. 40 CFR 136.5 - Approval of alternate test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and to the Alternate Test Procedure Program Coordinator, Office of Science and Technology (4303... to the Alternate Test Procedure Program Coordinator, Office of Science and Technology (4303), Office... will be forwarded to the Alternate Test Procedure Program Coordinator, Office of Science and Technology...

  1. 40 CFR 136.5 - Approval of alternate test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and to the Alternate Test Procedure Program Coordinator, Office of Science and Technology (4303... to the Alternate Test Procedure Program Coordinator, Office of Science and Technology (4303), Office... will be forwarded to the Alternate Test Procedure Program Coordinator, Office of Science and Technology...

  2. [Operational qualification of the computer-based information system and electronic data interchanges in a hospital blood bank].

    PubMed

    Vaquier, C; Legrand, D; Caldani, C

    2009-05-01

    Since 1985, a Council Resolution defines a new approach to technical harmonization and standards. The directives resulting from this new approach establish the essential safety requirements with which products put on the market must conform, and which should therefore enjoy free movement throughout the European Union, owing to a presumption of conformity. However, if the manufacturer is responsible for the conformity of its product in terms of safety, it is the end-user who must make sure that its requirements for a specific use or a considered application are satisfied and that the product meets its needs. It is the objective of the procedure of validation, which calls upon protocols of qualification intended to show the aptitude of a material, a system, a device, of an installation, to meet the requirements of specified quality and safety. This concept of qualification applies to the data-processing software of the hospital blood banks. Only the stage of operational qualification will be developed here. It involves scenarios made up of test files which make it possible to check the electronic data interchanges between the hospital blood bank and the blood establishment (transmission of the results of analysis, transmission of the data of traceability), as well as the functions of assistance to the issuing of the labile blood products.

  3. Round table discussion " Development of qualification framework in meteorology (TEMPUS QUALIMET)"

    NASA Astrophysics Data System (ADS)

    Bashmakova, I.; Belotserkovsky, A.; Karlin, L.; Petrosyan, A.; Serditova, N.; Zilitinkevich, S.

    2010-09-01

    The international consortium has started implementing a project aimed at the development of unified framework of qualifications in meteorology (QualiMet), setting a system of recognition and award of qualifications up to Doctoral level based on standards of knowledge, skill and competence acquired by learners is underway. The QualiMet has the following specific objectives: 1. To develop standards of knowledge, skills and competence for all qualifications up to Doctoral level needed in all possible occupations meteorology learner can undertake, by July 2011 2. To develop reciprocally recognized rubrics, criteria, methods and tools for assessing the compliance with the developed standards (quality assurance), by July 2012 3. To set the network of Centers of Excellence as the primary designer of sample education programs and learning experiences, both in brick-and-mortar and distant setting of delivery, leading to achievement of the developed standards, by December 2012 4. To set a system of mutual international recognition and award of qualifications in meteorology based on the developed procedures and establishment of self-regulatory public organization, by December 2012 The main beneficiaries of the project are: 1. Meteorology learners from the consortium countries. They will be able to make informed decisions about available qualification choices and progression options and provided an opportunity for students and graduates to participate in the system of international continuous education. 2. Meteorology employers from the consortium countries, They will be able to specify the level of knowledge, skill and competence required for occupational roles, evaluate qualifications presented, connect training and development with business needs. 3. Students and academic staff of all the consortium members, who will gain the increased mobility and exchange the fluxes of culturally and institutionally diversified lecturers and qualified specialists

  4. 5 CFR 302.403 - Qualifications for promotion.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Qualifications for promotion. 302.403... EMPLOYMENT IN THE EXCEPTED SERVICE Selection and Appointment; Reappointment; and Qualifications for Promotion § 302.403 Qualifications for promotion. In determining qualifications for promotion with respect to an...

  5. 40 CFR 1066.420 - Pre-test verification procedures and pre-test data collection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 34 2013-07-01 2013-07-01 false Pre-test verification procedures and pre-test data collection. 1066.420 Section 1066.420 Protection of Environment ENVIRONMENTAL PROTECTION... Test § 1066.420 Pre-test verification procedures and pre-test data collection. (a) Follow the...

  6. 40 CFR 1066.420 - Pre-test verification procedures and pre-test data collection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Pre-test verification procedures and pre-test data collection. 1066.420 Section 1066.420 Protection of Environment ENVIRONMENTAL PROTECTION... Test § 1066.420 Pre-test verification procedures and pre-test data collection. (a) Follow the...

  7. 40 CFR 63.786 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 11 2014-07-01 2014-07-01 false Test methods and procedures. 63.786...) National Emission Standards for Shipbuilding and Ship Repair (Surface Coating) § 63.786 Test methods and procedures. (a) For the compliance procedures described in § 63.785(c) (1) through (c)(3), Method 24 of 40...

  8. 49 CFR 219.605 - Positive drug test results; procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE Random Alcohol and Drug Testing Programs § 219.605 Positive drug test results; procedures. (a) [Reserved] (b) Procedures for administrative... 49 Transportation 4 2012-10-01 2012-10-01 false Positive drug test results; procedures. 219.605...

  9. 49 CFR 219.605 - Positive drug test results; procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE Random Alcohol and Drug Testing Programs § 219.605 Positive drug test results; procedures. (a) [Reserved] (b) Procedures for administrative... 49 Transportation 4 2010-10-01 2010-10-01 false Positive drug test results; procedures. 219.605...

  10. 49 CFR 219.605 - Positive drug test results; procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE Random Alcohol and Drug Testing Programs § 219.605 Positive drug test results; procedures. (a) [Reserved] (b) Procedures for administrative... 49 Transportation 4 2011-10-01 2011-10-01 false Positive drug test results; procedures. 219.605...

  11. 49 CFR 219.605 - Positive drug test results; procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE Random Alcohol and Drug Testing Programs § 219.605 Positive drug test results; procedures. (a) [Reserved] (b) Procedures for administrative... 49 Transportation 4 2013-10-01 2013-10-01 false Positive drug test results; procedures. 219.605...

  12. 49 CFR 219.605 - Positive drug test results; procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE Random Alcohol and Drug Testing Programs § 219.605 Positive drug test results; procedures. (a) [Reserved] (b) Procedures for administrative... 49 Transportation 4 2014-10-01 2014-10-01 false Positive drug test results; procedures. 219.605...

  13. 46 CFR 130.480 - Test procedure and operations manual.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Test procedure and operations manual. 130.480 Section... VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Automation of Unattended Machinery Spaces § 130.480 Test procedure and operations manual. (a) A procedure for tests to be conducted on automated...

  14. 48 CFR 3409.507 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Procedures. 3409.507 Section 3409.507 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 3409.507...

  15. 40 CFR 60.133 - Test methods and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Test methods and procedures. 60.133 Section 60.133 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... and Bronze Production Plants § 60.133 Test methods and procedures. (a) In conducting performance tests...

  16. 40 CFR 60.133 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Test methods and procedures. 60.133 Section 60.133 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... and Bronze Production Plants § 60.133 Test methods and procedures. (a) In conducting performance tests...

  17. 40 CFR 60.133 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.133 Section 60.133 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... and Bronze Production Plants § 60.133 Test methods and procedures. (a) In conducting performance tests...

  18. 40 CFR 86.342-79 - Post-test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 19 2013-07-01 2013-07-01 false Post-test procedures. 86.342-79... Post-test procedures. (a) Begin a hang-up check within 30 seconds of the completion of the last mode in... does not meet the requirements of § 86.328 the test is void. (d) Read and record the post-test data...

  19. 40 CFR 86.342-79 - Post-test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 19 2012-07-01 2012-07-01 false Post-test procedures. 86.342-79... Post-test procedures. (a) Begin a hang-up check within 30 seconds of the completion of the last mode in... does not meet the requirements of § 86.328 the test is void. (d) Read and record the post-test data...

  20. 40 CFR 91.411 - Post-test analyzer procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Post-test analyzer procedures. 91.411... Post-test analyzer procedures. (a) Perform a hang-up check within 60 seconds of the completion of the... and record the post-test data specified in § 91.405(e). (e) For a valid test, the analyzer drift...

  1. 40 CFR 91.411 - Post-test analyzer procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Post-test analyzer procedures. 91.411... Post-test analyzer procedures. (a) Perform a hang-up check within 60 seconds of the completion of the... and record the post-test data specified in § 91.405(e). (e) For a valid test, the analyzer drift...

  2. 40 CFR 91.411 - Post-test analyzer procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Post-test analyzer procedures. 91.411... Post-test analyzer procedures. (a) Perform a hang-up check within 60 seconds of the completion of the... and record the post-test data specified in § 91.405(e). (e) For a valid test, the analyzer drift...

  3. 40 CFR 91.411 - Post-test analyzer procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Post-test analyzer procedures. 91.411... Post-test analyzer procedures. (a) Perform a hang-up check within 60 seconds of the completion of the... and record the post-test data specified in § 91.405(e). (e) For a valid test, the analyzer drift...

  4. 40 CFR 86.342-79 - Post-test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Post-test procedures. 86.342-79... Post-test procedures. (a) Begin a hang-up check within 30 seconds of the completion of the last mode in... does not meet the requirements of § 86.328 the test is void. (d) Read and record the post-test data...

  5. 40 CFR 86.342-79 - Post-test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 18 2011-07-01 2011-07-01 false Post-test procedures. 86.342-79... Post-test procedures. (a) Begin a hang-up check within 30 seconds of the completion of the last mode in... does not meet the requirements of § 86.328 the test is void. (d) Read and record the post-test data...

  6. 40 CFR 91.411 - Post-test analyzer procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Post-test analyzer procedures. 91.411... Post-test analyzer procedures. (a) Perform a hang-up check within 60 seconds of the completion of the... and record the post-test data specified in § 91.405(e). (e) For a valid test, the analyzer drift...

  7. 40 CFR 62.14595 - What are the operator training and qualification requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operate the CISWI unit directly or be the direct supervisor of one or more other plant personnel who operate the unit. If all qualified CISWI unit operators are temporarily not accessible, you must follow the procedures in § 62.14625. (b) Operator training and qualification must be obtained through a State...

  8. 40 CFR 62.14595 - What are the operator training and qualification requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operate the CISWI unit directly or be the direct supervisor of one or more other plant personnel who operate the unit. If all qualified CISWI unit operators are temporarily not accessible, you must follow the procedures in § 62.14625. (b) Operator training and qualification must be obtained through a State...

  9. 40 CFR 86.1227-96 - Test procedures; overview.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Methanol-Fueled Heavy-Duty Vehicles § 86.1227-96 Test procedures; overview. (a) The overall test consists... petroleum gas-fueled, and methanol-fueled vehicles) is designed to determine hydrocarbon and/or methanol... operation, which result in hydrocarbon and/or methanol vapor losses. The test procedure is designed to...

  10. 34 CFR 300.156 - Personnel qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... children with disabilities. (c) Qualifications for special education teachers. The qualifications described... personnel to provide special education and related services under this part to children with disabilities... 34 Education 2 2011-07-01 2010-07-01 true Personnel qualifications. 300.156 Section 300.156...

  11. 5 CFR 319.302 - Individual qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Individual qualifications. 319.302... Individual qualifications. Agency heads are delegated authority to approve the qualifications of individuals appointed to SL and ST positions. The agency head must determine that the individual meets the...

  12. 10 CFR 603.510 - Recipient qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Recipient qualifications. 603.510 Section 603.510 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Pre-Award Business Evaluation Recipient Qualification § 603.510 Recipient qualifications. Prior to award of a TIA, the...

  13. 10 CFR 603.510 - Recipient qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Recipient qualifications. 603.510 Section 603.510 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Pre-Award Business Evaluation Recipient Qualification § 603.510 Recipient qualifications. Prior to award of a TIA, the...

  14. 20 CFR 404.1519m - Diagnostic tests or procedures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Diagnostic tests or procedures. 404.1519m... Report Content § 404.1519m Diagnostic tests or procedures. We will request the results of any diagnostic... will not order diagnostic tests or procedures that involve significant risk to you, such as myelograms...

  15. 40 CFR 60.614 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.614... Unit Processes § 60.614 Test methods and procedures. (a) For the purpose of demonstrating compliance... any performance test. (b) The following methods in appendix A to this part, except as provided under...

  16. 40 CFR 60.614 - Test methods and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false Test methods and procedures. 60.614... Unit Processes § 60.614 Test methods and procedures. (a) For the purpose of demonstrating compliance... any performance test. (b) The following methods in appendix A to this part, except as provided under...

  17. 40 CFR 60.614 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false Test methods and procedures. 60.614... Unit Processes § 60.614 Test methods and procedures. (a) For the purpose of demonstrating compliance... any performance test. (b) The following methods in appendix A to this part, except as provided under...

  18. 40 CFR 63.565 - Test methods and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Test methods and procedures. 63.565... Standards for Marine Tank Vessel Loading Operations § 63.565 Test methods and procedures. (a) Performance... as possible to the connection with the marine tank vessel; and (3) During the performance test...

  19. 40 CFR 63.565 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 10 2012-07-01 2012-07-01 false Test methods and procedures. 63.565... Standards for Marine Tank Vessel Loading Operations § 63.565 Test methods and procedures. (a) Performance... as possible to the connection with the marine tank vessel; and (3) During the performance test...

  20. 40 CFR 63.565 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 10 2014-07-01 2014-07-01 false Test methods and procedures. 63.565... Standards for Marine Tank Vessel Loading Operations § 63.565 Test methods and procedures. (a) Performance... as possible to the connection with the marine tank vessel; and (3) During the performance test...

  1. 40 CFR 63.565 - Test methods and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 10 2013-07-01 2013-07-01 false Test methods and procedures. 63.565... Standards for Marine Tank Vessel Loading Operations § 63.565 Test methods and procedures. (a) Performance... as possible to the connection with the marine tank vessel; and (3) During the performance test...

  2. 40 CFR 63.565 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 9 2011-07-01 2011-07-01 false Test methods and procedures. 63.565... Standards for Marine Tank Vessel Loading Operations § 63.565 Test methods and procedures. (a) Performance... as possible to the connection with the marine tank vessel; and (3) During the performance test...

  3. 40 CFR 1065.520 - Pre-test verification procedures and pre-test data collection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 34 2013-07-01 2013-07-01 false Pre-test verification procedures and pre-test data collection. 1065.520 Section 1065.520 Protection of Environment ENVIRONMENTAL PROTECTION... Specified Duty Cycles § 1065.520 Pre-test verification procedures and pre-test data collection. (a) If your...

  4. 40 CFR 1065.520 - Pre-test verification procedures and pre-test data collection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Pre-test verification procedures and pre-test data collection. 1065.520 Section 1065.520 Protection of Environment ENVIRONMENTAL PROTECTION... Specified Duty Cycles § 1065.520 Pre-test verification procedures and pre-test data collection. (a) If your...

  5. 40 CFR 1065.520 - Pre-test verification procedures and pre-test data collection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Pre-test verification procedures and pre-test data collection. 1065.520 Section 1065.520 Protection of Environment ENVIRONMENTAL PROTECTION... Specified Duty Cycles § 1065.520 Pre-test verification procedures and pre-test data collection. (a) For...

  6. 40 CFR 1065.520 - Pre-test verification procedures and pre-test data collection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Pre-test verification procedures and pre-test data collection. 1065.520 Section 1065.520 Protection of Environment ENVIRONMENTAL PROTECTION... Specified Duty Cycles § 1065.520 Pre-test verification procedures and pre-test data collection. (a) If your...

  7. 40 CFR 1065.520 - Pre-test verification procedures and pre-test data collection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 33 2011-07-01 2011-07-01 false Pre-test verification procedures and pre-test data collection. 1065.520 Section 1065.520 Protection of Environment ENVIRONMENTAL PROTECTION... Specified Duty Cycles § 1065.520 Pre-test verification procedures and pre-test data collection. (a) If your...

  8. 20 CFR 416.919m - Diagnostic tests or procedures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Diagnostic tests or procedures. 416.919m... for Report Content § 416.919m Diagnostic tests or procedures. We will request the results of any diagnostic tests or procedures that have been performed as part of a workup by your treating source or other...

  9. Space Shuttle solid rocket motor /SRM/ development and qualification

    NASA Technical Reports Server (NTRS)

    Lund, R. K.; Brinton, B. C.

    1980-01-01

    The configuration of the reusable Space Shuttle solid rocket motors is described. In addition, their design evolution is reviewed, noting that the requirement that certain components be recovered, refurbished, and used on as many as 20 flights dictated a conservative design approach, the validity of which has been proven by successful testing of all development and qualification motors. Aspects discussed include ballistics, the motor case, nozzle, nozzle materials, and the ignition system. Finally, summary results of the first two of three qualification motor firings designated QM-1 and QM-2 are presented.

  10. Qualification of the new French balloon system and of the new Canadian launch site

    NASA Astrophysics Data System (ADS)

    Vargas, André; Levesque, Daniel

    In the frame of an international collaboration between the ‘Centre National d’Etudes Spatiales’ (CNES) and the Canadian Space Agency (CSA), a new mid-latitude stratospheric balloon base has been developed and finalized at the Victor M. Power Timmins Airport, located in Ontario, Canada. As part of this collaboration, CNES, based on its 3500 flights heritage and 50 years experience in ballooning, provides all flight hardware, including a newly developed control system for aerostats known as NOSYCA, as well as all associated ground support equipment. On the other hand, CSA provides a mid-latitude launch base located in a low populated area of northern Ontario, aerostats recovery services as well as interfaces with all national authorities needed to fly heavy stratospheric balloons safely within Canadian airspace. In exchanges of these services, Canadian payloads are to be flown yearly by CNES from its worldwide network of sites. Following the completion of the base’s construction in March 2013, a qualification plan was put together by the two (2) agencies in order to test and verify all technical and operational aspects of this new mid-latitude launch site. Furthermore, the plan included hosting NOSYCA’s maiden flights, with the aim of allowing CNES to resume stratospheric science campaigns as soon as 2014. For CNES, the main objectives of the campaign were to qualify NOSYCA as well as to tests ground and flight operational procedures. For the CSA, the goals were to qualify its launch base, recovery procedures, operational procedures with national authorities, and to validate mapping & drop zones. The campaign, which began in June 2013, was successfully completed in September 2013 with two (2) qualification flights that included a one hundred (100) and an eight hundreds (800) thousands meter cubes balloons, lasting 10 and 13 hours respectively. This paper presents, in the context of this French-Canadian collaboration, the results from the first campaign, and

  11. 48 CFR 9.506 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 9.506 Procedures. (a) If... conflicts of interest or to develop recommended actions, contracting officers should first seek the information from within the Government or from other readily available sources. Government sources include the...

  12. 40 CFR 60.93 - Test methods and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Test methods and procedures. 60.93... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Hot Mix Asphalt Facilities § 60.93 Test methods and procedures. (a) In conducting the performance tests required in § 60.8...

  13. 40 CFR 60.335 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Test methods and procedures. 60.335... Turbines § 60.335 Test methods and procedures. (a) The owner or operator shall conduct the performance tests required in § 60.8, using either (1) EPA Method 20, (2) ASTM D6522-00 (incorporated by reference...

  14. 40 CFR 60.335 - Test methods and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Test methods and procedures. 60.335... Turbines § 60.335 Test methods and procedures. (a) The owner or operator shall conduct the performance tests required in § 60.8, using either (1) EPA Method 20, (2) ASTM D6522-00 (incorporated by reference...

  15. 40 CFR 60.335 - Test methods and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false Test methods and procedures. 60.335... Turbines § 60.335 Test methods and procedures. (a) The owner or operator shall conduct the performance tests required in § 60.8, using either (1) EPA Method 20, (2) ASTM D6522-00 (incorporated by reference...

  16. 40 CFR 60.335 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false Test methods and procedures. 60.335... Turbines § 60.335 Test methods and procedures. (a) The owner or operator shall conduct the performance tests required in § 60.8, using either (1) EPA Method 20, (2) ASTM D6522-00 (incorporated by reference...

  17. BSM Delta Qualification 2, volume 2

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This report, presented in three volumes, provides the results of a two-motor Delta Qualification 2 program conducted in 1993 to certify the following enhancements for incorporation into booster separation motor (BSM) flight hardware: vulcanized-in-place nozzle aft closure insulation; new iso-static ATJ bulk graphite throat insert material; adhesive EA 9394 for bonding the nozzle throat, igniter grain rod/centering insert/igniter case; deletion of the igniter adapter insulator ring; deletion of the igniter adapter/igniter case interface RTV; and deletion of loctite from igniter retainer plate threads. The enhancements above directly resulted from (1) the BSM total quality management (TQM) team initiatives to enhance the BSM producibility, and (2) the necessity to qualify new throat insert and adhesive systems to replace existing materials that will not be available. Testing was completed at both the component and motor levels. Component testing was accomplished to screen candidate materials (e.g., throat materials, adhesive systems) and to optimize processes (e.g., aft closure insulator vulcanization approach) prior to their incorporation into the test motors. Motor tests -- consisting of two motors, randomly selected by USBI's on-site quality personnel from production lot AAY, which were modified to accept the enhancements -- were completed to provide the final qualification of the enhancements for incorporation into flight hardware. Volume 2 details the environmental testing (vibration and shock) conducted at Marshall Space Flight Center (MSFC) to which the motors were subjected prior to static tests.

  18. 29 CFR 32.14 - Job qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 1 2014-07-01 2013-07-01 true Job qualifications. 32.14 Section 32.14 Labor Office of the... FINANCIAL ASSISTANCE Employment Practices and Employment Related Training Participation § 32.14 Job... appropriateness of all job qualifications to ensure that to the extent job qualifications tend to exclude...

  19. 29 CFR 32.14 - Job qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 1 2013-07-01 2013-07-01 false Job qualifications. 32.14 Section 32.14 Labor Office of the... FINANCIAL ASSISTANCE Employment Practices and Employment Related Training Participation § 32.14 Job... appropriateness of all job qualifications to ensure that to the extent job qualifications tend to exclude...

  20. 29 CFR 32.14 - Job qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Job qualifications. 32.14 Section 32.14 Labor Office of the... FINANCIAL ASSISTANCE Employment Practices and Employment Related Training Participation § 32.14 Job... appropriateness of all job qualifications to ensure that to the extent job qualifications tend to exclude...

  1. 29 CFR 32.14 - Job qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 1 2012-07-01 2012-07-01 false Job qualifications. 32.14 Section 32.14 Labor Office of the... FINANCIAL ASSISTANCE Employment Practices and Employment Related Training Participation § 32.14 Job... appropriateness of all job qualifications to ensure that to the extent job qualifications tend to exclude...

  2. 29 CFR 32.14 - Job qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 1 2011-07-01 2011-07-01 false Job qualifications. 32.14 Section 32.14 Labor Office of the... FINANCIAL ASSISTANCE Employment Practices and Employment Related Training Participation § 32.14 Job... appropriateness of all job qualifications to ensure that to the extent job qualifications tend to exclude...

  3. 10 CFR 603.510 - Recipient qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Evaluation Recipient Qualification § 603.510 Recipient qualifications. Prior to award of a TIA, the... for awarding a grant or cooperative agreement. If the recipient is a consortium that is not formally... 10 Energy 4 2014-01-01 2014-01-01 false Recipient qualifications. 603.510 Section 603.510 Energy...

  4. 10 CFR 603.510 - Recipient qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Evaluation Recipient Qualification § 603.510 Recipient qualifications. Prior to award of a TIA, the... for awarding a grant or cooperative agreement. If the recipient is a consortium that is not formally... 10 Energy 4 2011-01-01 2011-01-01 false Recipient qualifications. 603.510 Section 603.510 Energy...

  5. 10 CFR 603.510 - Recipient qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Evaluation Recipient Qualification § 603.510 Recipient qualifications. Prior to award of a TIA, the... for awarding a grant or cooperative agreement. If the recipient is a consortium that is not formally... 10 Energy 4 2012-01-01 2012-01-01 false Recipient qualifications. 603.510 Section 603.510 Energy...

  6. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... required for testing the energy consumption of electric vehicles. ...

  7. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... required for testing the energy consumption of electric vehicles. ...

  8. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... required for testing the energy consumption of electric vehicles. ...

  9. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... required for testing the energy consumption of electric vehicles. ...

  10. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Test procedure. 33.37 Section 33.37 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements...

  11. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Test procedure. 33.37 Section 33.37 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements...

  12. 40 CFR 60.664 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.664... Operations § 60.664 Test methods and procedures. (a) For the purpose of demonstrating compliance with § 60... performance test. (b) The following methods in appendix A to this part, except as provided under § 60.8(b...

  13. 40 CFR 60.664 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false Test methods and procedures. 60.664... Operations § 60.664 Test methods and procedures. (a) For the purpose of demonstrating compliance with § 60... performance test. (b) The following methods in appendix A to this part, except as provided under § 60.8(b...

  14. 40 CFR 60.664 - Test methods and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false Test methods and procedures. 60.664... Operations § 60.664 Test methods and procedures. (a) For the purpose of demonstrating compliance with § 60... performance test. (b) The following methods in appendix A to this part, except as provided under § 60.8(b...

  15. Test equality between two binary screening tests with a confirmatory procedure restricted on screen positives.

    PubMed

    Lui, Kung-Jong; Chang, Kuang-Chao

    2015-01-01

    In studies of screening accuracy, we may commonly encounter the data in which a confirmatory procedure is administered to only those subjects with screen positives for ethical concerns. We focus our discussion on simultaneously testing equality of sensitivity and specificity between two binary screening tests when only subjects with screen positives receive the confirmatory procedure. We develop four asymptotic test procedures and one exact test procedure. We derive sample size calculation formula for a desired power of detecting a difference at a given nominal [Formula: see text]-level. We employ Monte Carlo simulation to evaluate the performance of these test procedures and the accuracy of the sample size calculation formula developed here in a variety of situations. Finally, we use the data obtained from a study of the prostate-specific-antigen test and digital rectal examination test on 949 Black men to illustrate the practical use of these test procedures and the sample size calculation formula.

  16. Evaluation of ride quality measurement procedures by subjective experiments using simulators

    NASA Technical Reports Server (NTRS)

    Klauder, L. T., Jr.; Clevenson, S. A.

    1975-01-01

    Since ride quality is, by definition, a matter of passenger response, there is need for a qualification procedure (QP) for establishing the degree to which any particular ride quality measurement procedure (RQMP) does correlate with passenger responses. Once established, such a QP will provide very useful guidance for optimal adjustment of the various parameters which any given RQMP contains. A QP is proposed based on use of a ride motion simulator and on test subject responses to recordings of actual vehicle motions. Test subject responses are used to determine simulator gain settings for the individual recordings such as to make all of the simulated rides equally uncomfortable to the test subjects. Simulator platform accelerations vs. time are recorded with each ride at its equal discomfort gain setting. The equal discomfort platform acceleration recordings are then digitzed.

  17. Qualification of submerged-arc narrow strip cladding process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ayres, P.S.; Gottschling, J.D.; Jeffers, G.K.

    1975-08-01

    An unique narrow strip cladding process for use on both plate and forging material for nuclear components was developed. The qualification testing of this low-heat input process for cladding nuclear components, including those of SA508 Class 2 material is described. The theory that explains the acceptable results of these tests is also given. (auth)

  18. Qualification of submerged-arc narrow strip cladding process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ayres, P.S.; Gottschling, J.D.; Jeffers, G.K.

    1976-03-01

    Babcock and Wilcox has developed an unique narrow strip cladding process for use on both plate and forging material for nuclear components. The qualification testing of this low-heat input process for cladding nuclear components is described, including those of SA508 Class 2 material. The theory that explains the acceptable results of these tests is also given.

  19. 48 CFR 1409.506 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 1409.506 Procedures. If the CO determines that contractor performance of the contemplated work is likely to create an organizational conflict of interest, then the contracting officer shall refer the documentation of the potential...

  20. Components Qualification for a Possible use in the Mu2e Calorimeter Waveform Digitizer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Di Falco, S.; Donati, S.; Morescalchi, L.

    2017-03-30

    The Mu2e experiment at Fermilab searches for the charged flavor violating conversion of a muon into an electron in the Coulomb field of a nucleus. The detector consists of a straw tube tracker and a CSI crystal electromagnetic calorimeter, both housed in a superconducting solenoid. Both the front-end and the digital electronics, located inside the cryostat, will be operated in vacuum under a 1 T magnetic field, having to sustain the high flux of neutrons and ionizing particles coming from the muons stopping target. These harsh experimental conditions make the design of the calorimeter waveform digitizer quite challenging. All themore » selected commercial devices must be tested individually and qualified for radiation hardness and operation in high magnetic field. At the moment the expected particles flux and spectra at the digitizers location are not completely simulated and we are using initial rough estimates to select the components for the first prototype. We are gaining experience in the qualification procedures using the selected components but the choice will be frozen only when dose and neutron flux simulations will be completed. The experimental results of the first qualification campaign are presented.« less