Sample records for qualification tests gas

  1. Test report: Electron-proton spectrometer qualification test unit, qualification test

    NASA Technical Reports Server (NTRS)

    Vincent, D. L.

    1972-01-01

    Qualification tests of the electron-proton spectrometer test unit are presented. The tests conducted were: (1) functional, (2) thermal/vacuum, (3) electromagnetic interference, (4) acoustic, (5) shock, (6) vibration, and (7) humidity. Results of each type of test are presented in the form of data sheets.

  2. WTP Waste Feed Qualification: Hydrogen Generation Rate Measurement Apparatus Testing Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stone, M. E.; Newell, J. D.; Smith, T. E.

    The generation rate of hydrogen gas in the Hanford tank waste will be measured during the qualification of the staged tank waste for processing in the Hanford Tank Waste Treatment and Immobilization Plant. Based on a review of past practices in measurement of the hydrogen generation, an apparatus to perform this measurement has been designed and tested for use during waste feed qualification. The hydrogen generation rate measurement apparatus (HGRMA) described in this document utilized a 100 milliliter sample in a continuously-purged, continuously-stirred vessel, with measurement of hydrogen concentration in the vent gas. The vessel and lid had a combinedmore » 220 milliliters of headspace. The vent gas system included a small condenser to prevent excessive evaporative losses from the sample during the test, as well as a demister and filter to prevent particle migration from the sample to the gas chromatography system. The gas chromatograph was an on line automated instrument with a large-volume sample-injection system to allow measurement of very low hydrogen concentrations. This instrument automatically sampled the vent gas from the hydrogen generation rate measurement apparatus every five minutes and performed data regression in real time. The fabrication of the hydrogen generation rate measurement apparatus was in accordance with twenty three (23) design requirements documented in the conceptual design package, as well as seven (7) required developmental activities documented in the task plan associated with this work scope. The HGRMA was initially tested for proof of concept with physical simulants, and a remote demonstration of the system was performed in the Savannah River National Laboratory Shielded Cells Mockup Facility. Final verification testing was performed using non-radioactive simulants of the Hanford tank waste. Three different simulants were tested to bound the expected rheological properties expected during waste feed qualification testing

  3. 46 CFR 57.01-1 - Qualifications and production tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND... regulations in this part shall apply to the qualification of welding procedures, welders, and brazers, and to production tests for all types of manual and machine arc and gas welding and brazing processes. (b) (Modifies...

  4. 46 CFR 57.01-1 - Qualifications and production tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND... regulations in this part shall apply to the qualification of welding procedures, welders, and brazers, and to production tests for all types of manual and machine arc and gas welding and brazing processes. (b) (Modifies...

  5. 46 CFR 57.01-1 - Qualifications and production tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND... regulations in this part shall apply to the qualification of welding procedures, welders, and brazers, and to production tests for all types of manual and machine arc and gas welding and brazing processes. (b) (Modifies...

  6. 46 CFR 57.01-1 - Qualifications and production tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND... regulations in this part shall apply to the qualification of welding procedures, welders, and brazers, and to production tests for all types of manual and machine arc and gas welding and brazing processes. (b) (Modifies...

  7. 46 CFR 57.01-1 - Qualifications and production tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND... regulations in this part shall apply to the qualification of welding procedures, welders, and brazers, and to production tests for all types of manual and machine arc and gas welding and brazing processes. (b) (Modifies...

  8. 16 CFR 1210.14 - Qualification testing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Qualification testing. 1210.14 Section 1210.14 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS SAFETY STANDARD FOR CIGARETTE LIGHTERS Certification Requirements § 1210.14 Qualification testing. (a...

  9. 16 CFR 1209.34 - Qualification testing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....34 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM SAFETY STANDARD FOR CELLULOSE INSULATION Certification § 1209.34 Qualification testing. (a... labelers, or importers may select samples for qualification testing of a product in any manner they desire. ...

  10. AZ-101 Mixer Pump Test Qualification Test Procedures (QTP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    THOMAS, W.K.

    2000-01-10

    Describes the Qualification test procedure for the AZ-101 Mixer Pump Data Acquisition System (DAS). The purpose of this Qualification Test Procedure (QTP) is to confirm that the AZ-101 Mixer Pump System has been properly programmed and hardware configured correctly. This QTP will test the software setpoints for the alarms and also check the wiring configuration from the SIMcart to the HMI. An Acceptance Test Procedure (ATP), similar to this QTP will be performed to test field devices and connections from the field.

  11. 42 CFR 493.1423 - Standard; Testing personnel qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 5 2013-10-01 2013-10-01 false Standard; Testing personnel qualifications. 493... Testing Laboratories Performing Moderate Complexity Testing § 493.1423 Standard; Testing personnel qualifications. Each individual performing moderate complexity testing must— (a) Possess a current license issued...

  12. 42 CFR 493.1423 - Standard; Testing personnel qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Standard; Testing personnel qualifications. 493... Testing Laboratories Performing Moderate Complexity Testing § 493.1423 Standard; Testing personnel qualifications. Each individual performing moderate complexity testing must— (a) Possess a current license issued...

  13. 42 CFR 493.1423 - Standard; Testing personnel qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 5 2014-10-01 2014-10-01 false Standard; Testing personnel qualifications. 493... Testing Laboratories Performing Moderate Complexity Testing § 493.1423 Standard; Testing personnel qualifications. Each individual performing moderate complexity testing must— (a) Possess a current license issued...

  14. 42 CFR 493.1423 - Standard; Testing personnel qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 5 2012-10-01 2012-10-01 false Standard; Testing personnel qualifications. 493... Testing Laboratories Performing Moderate Complexity Testing § 493.1423 Standard; Testing personnel qualifications. Each individual performing moderate complexity testing must— (a) Possess a current license issued...

  15. 16 CFR § 1210.14 - Qualification testing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Qualification testing. § 1210.14 Section § 1210.14 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS SAFETY STANDARD FOR CIGARETTE LIGHTERS Certification Requirements § 1210.14 Qualification testing. (a...

  16. 48 CFR 34.103 - Testing and qualification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Developed Under Title III, Defense Production Act 34.103 Testing and qualification. (a) Contractors... or item of supply; and (2) for major systems in production, remaining quantities to be acquired are sufficient to justify incurring the cost of testing and qualification. In evaluating this request, the...

  17. 49 CFR 213.345 - Vehicle qualification testing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Vehicle qualification testing. 213.345 Section 213... Higher § 213.345 Vehicle qualification testing. (a) All rolling stock types which operate at Class 6... demonstrate that the vehicle dynamic response to track alinement and geometry variations are within acceptable...

  18. Gas Metal Arc Weld (GMAW) Qualification of 7020-T651 Aluminum

    DTIC Science & Technology

    2015-11-01

    ARL-TR-7515 ● NOV 2015 US Army Research Laboratory Gas Metal Arc Weld (GMAW) Qualification of 7020-T651 Aluminum by John F...Metal Arc Weld (GMAW) Qualification of 7020-T651 Aluminum by John F Chinella Weapons and Materials Research Directorate, ARL Nick Kapustka and...Seth Shira Edison Welding Institute, Columbus, Ohio Approved for public release; distribution is unlimited. ii REPORT

  19. Rail vehicle qualification test compendium.

    DOT National Transportation Integrated Search

    2015-02-01

    Qualification and acceptance testing and analysis for new passenger rail vehicles for transit systems has been specified by the transit/commuter agency for which the cars will be supplied to and/or by government agencies. Regulatory testing defined b...

  20. 46 CFR 57.05-4 - Welder qualification by procedure tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Welder qualification by procedure tests. 57.05-4 Section 57.05-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING Performance Qualifications § 57.05-4 Welder qualification by procedure tests...

  1. 46 CFR 57.05-4 - Welder qualification by procedure tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Welder qualification by procedure tests. 57.05-4 Section 57.05-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING Performance Qualifications § 57.05-4 Welder qualification by procedure tests...

  2. 46 CFR 57.05-4 - Welder qualification by procedure tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Welder qualification by procedure tests. 57.05-4 Section 57.05-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING Performance Qualifications § 57.05-4 Welder qualification by procedure tests...

  3. 46 CFR 57.05-4 - Welder qualification by procedure tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Welder qualification by procedure tests. 57.05-4 Section 57.05-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING Performance Qualifications § 57.05-4 Welder qualification by procedure tests...

  4. 46 CFR 57.05-4 - Welder qualification by procedure tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Welder qualification by procedure tests. 57.05-4 Section 57.05-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING Performance Qualifications § 57.05-4 Welder qualification by procedure tests...

  5. Qualification Lab Testing on M1 Abrams Engine Oil Filters

    DTIC Science & Technology

    2016-11-01

    UNCLASSIFIED QUALIFICATION LAB TESTING ON M1 ABRAMS ENGINE OIL FILTERS FINAL REPORT TFLRF No. 483 by Kristi K. Rutta U.S...the originator. UNCLASSIFIED QUALIFICATION LAB TESTING ON M1 ABRAMS ENGINE OIL FILTERS FINAL REPORT TFLRF No. 483 by Kristi K...TITLE AND SUBTITLE Qualification Lab Testing on M1 Abrams Engine Oil Filter 5a. CONTRACT NUMBER W56HZV-15-C-0030 5b. GRANT NUMBER 5c. PROGRAM

  6. 49 CFR 178.33b-7 - Design qualification test.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., each new design must be drop tested as follows: Three groups of twenty-five filled containers must be... 49 Transportation 2 2010-10-01 2010-10-01 false Design qualification test. 178.33b-7 Section 178... PACKAGINGS Specifications for Inside Containers, and Linings § 178.33b-7 Design qualification test. (a) Drop...

  7. 49 CFR 178.33b-7 - Design qualification test.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Design qualification test. 178.33b-7 Section 178... Specifications for Inside Containers, and Linings § 178.33b-7 Design qualification test. (a) Drop testing. (1) To ensure that creep does not affect the ability of the container to retain the contents, each new design...

  8. Guide for Oxygen Component Qualification Tests

    NASA Technical Reports Server (NTRS)

    Bamford, Larry J.; Rucker, Michelle A.; Dobbin, Douglas

    1996-01-01

    Although oxygen is a chemically stable element, it is not shock sensitive, will not decompose, and is not flammable. Oxygen use therefore carries a risk that should never be overlooked, because oxygen is a strong oxidizer that vigorously supports combustion. Safety is of primary concern in oxygen service. To promote safety in oxygen systems, the flammability of materials used in them should be analyzed. At the NASA White Sands Test Facility (WSTF), we have performed configurational tests of components specifically engineered for oxygen service. These tests follow a detailed WSTF oxygen hazards analysis. The stated objective of the tests was to provide performance test data for customer use as part of a qualification plan for a particular component in a particular configuration, and under worst-case conditions. In this document - the 'Guide for Oxygen Component Qualification Tests' - we outline recommended test systems, and cleaning, handling, and test procedures that address worst-case conditions. It should be noted that test results apply specifically to: manual valves, remotely operated valves, check valves, relief valves, filters, regulators, flexible hoses, and intensifiers. Component systems are not covered.

  9. PDSS/IMC qualification test software acceptance procedures

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Tests to be performed for qualifying the payload development support system image motion compensator (IMC) are identified. The performance of these tests will verify the IMC interfaces and thereby verify the qualification test software.

  10. 16 CFR 1212.14 - Qualification testing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Qualification testing. 1212.14 Section 1212.14 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS...) Testing. Before any manufacturer or importer of multi-purpose lighters distributes multi-purpose lighters...

  11. Payload test philosophy. [JPL views on qualification/acceptance testing

    NASA Technical Reports Server (NTRS)

    Gindorf, T.

    1979-01-01

    The general philosophy of how JPL views payload qualification/acceptance testing for programs that are done either in-house or by contractors is described. Particular attention is given to mission risk classifications, preliminary critical design reviews, environmental design requirements, the thermal and dynamics development tests, and the flight spacecraft system test.

  12. AP-102/104 Retrieval control system qualification test procedure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    RIECK, C.A.

    1999-05-18

    This Qualification Test Procedure documents the results of the qualification testing that was performed on the Project W-211, ''Initial Tank Retrieval Systems,'' retrieval control system (RCS) for tanks 241-AP-102 and 241-AP-104. The results confirm that the RCS has been programmed correctly and that the two related hardware enclosures have been assembled in accordance with the design documents.

  13. 29 CFR 1630.10 - Qualification standards, tests, and other selection criteria.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... business necessity. (b) Qualification standards and tests related to uncorrected vision. Notwithstanding..., or other selection criteria based on an individual's uncorrected vision unless the standard, test, or... application of a qualification standard, test, or other criterion based on uncorrected vision need not be a...

  14. 78 FR 67206 - Qualification Tests for Safety-Related Actuators in Nuclear Power Plants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0079] Qualification Tests for Safety-Related Actuators in..., ``Qualification Tests for Safety-Related Actuators in Nuclear Power Plants.'' This RG is being revised to provide... power plants. This RG is proposed Revision 1 of RG 1.73, ``Qualification Tests of Electric Valve...

  15. Results of qualification tests on water-level sensing instruments, 1987

    USGS Publications Warehouse

    Olive, T.E.

    1989-01-01

    The U.S. Geological Survey 's Hydrologic Instrumentation Facility at the Stennis Space Center, Mississippi, conducts qualification tests on water level sensing instruments. Instrument systems, which meet or exceed the Survey 's minimum performance requirements, are placed on the Survey 's Qualified Products List. The qualification tests conducted in 1987 added two instrument systems to the Survey 's Qualified Products List. One system met requirements for use at a daily-discharge station , and the other system met requirements for a special-case station. The report is prepared for users of hydrologic instruments. The report provides a list of instrument features, describes the instrument systems, summarizes test procedures, and presents test results for the two instrument systems that met the Survey 's minimum performance standards for the 1987 round of qualification tests. (USGS)

  16. Results of qualification tests on water-level sensing instruments, 1986

    USGS Publications Warehouse

    Holland, Randolph R.; Rapp, Donald H.

    1988-01-01

    This report presents to users of hydrological instrumentation and U.S. Geological Survey procurement personnel a list of instruments that have met or exceeded the Survey 's minimum performance requirements for water level sensing instruments. The Hydrologic Instrumentation Facility at the National Space Technology Laboratories, Mississippi conducted qualification tests on four instrument systems. The data collected are summarized, brief system descriptions are given, qualification testing purposes and procedures are summarized, and results are given for each of the three systems that met performance requirements. The fourth system was returned to the manufacturer , because in preliminary testing the instrument system did not perform properly according to the manufacturer 's operating procedures. As a result of the qualification tests, the three systems that met performance requirements have been included on the Survey 's Qualified Products List. (USGS)

  17. 16 CFR 1204.15 - Qualification testing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Qualification testing. 1204.15 Section 1204.15 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS SAFETY STANDARD FOR OMNIDIRECTIONAL CITIZENS BAND BASE STATION ANTENNAS Certification § 1204.15...

  18. 16 CFR 1210.14 - Qualification testing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....14 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS SAFETY STANDARD FOR CIGARETTE LIGHTERS Certification Requirements § 1210.14 Qualification testing. (a... accordance with § 1210.4. (b) Product modifications. If any changes are made to a product after initial...

  19. Hot-spot qualification testing of concentrator modules

    NASA Technical Reports Server (NTRS)

    Gonzalez, C. C.; Sugimura, R. S.; Ross, R. G., Jr.

    1987-01-01

    Results of a study to determine the hot-spot susceptibility of concentrator cells, to provide a hot-spot qualification test for concentrator modules, and to provide guidelines for reducing hot-spot susceptibility are presented. Hot-spot heating occurs in a photovoltaic module when the short-circuit current of a cell is lower than the string operating current, forcing the cell into reverse bias with a concurrent power dissipation. Although the basis for the concentrator-module hot-spot qualification test is the test developed for flat-plate modules, issues such as providing cell illumination introduce additional complexities into the testing procedure. The results indicate that the same general guidelines apply to protecting concentrator modules from hot-spot stressing as apply to flat-plate modules, and recommendations are made on the number of bypass diodes required per given number of series cells per module or source circuit. A method for determining the cell temperature in the laboratory or in the field is discussed.

  20. PULSE COMBUSTOR DESIGN QUALIFICATION TEST AND CLEAN COAL FEEDSTOCK TEST - VOLUME I AND VOLUME II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Unknown

    For this Cooperative Agreement, the pulse heater module is the technology envelope for an indirectly heated steam reformer. The field of use of the steam reformer pursuant to this Cooperative Agreement with DOE is for the processing of sub-bituminous coals and lignite. The main focus is the mild gasification of such coals for the generation of both fuel gas and char--for the steel industry is the main focus. An alternate market application for the substitution of metallurgical coke is also presented. This project was devoted to qualification of a 253-tube pulse heater module. This module was designed, fabricated, installed, instrumentedmore » and tested in a fluidized bed test facility. Several test campaigns were conducted. This larger heater is a 3.5 times scale-up of the previous pulse heaters that had 72 tubes each. The smaller heater has been part of previous pilot field testing of the steam reformer at New Bern, North Carolina. The project also included collection and reduction of mild gasification process data from operation of the process development unit (PDU). The operation of the PDU was aimed at conditions required to produce char (and gas) for the Northshore Steel Operations. Northshore Steel supplied the coal for the process unit tests.« less

  1. WTP Waste Feed Qualification: Glass Fabrication Unit Operation Testing Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stone, M. E.; Newell, J. D.; Johnson, F. C.

    The waste feed qualification program is being developed to protect the Hanford Tank Waste Treatment and Immobilization Plant (WTP) design, safety basis, and technical basis by assuring waste acceptance requirements are met for each staged waste feed campaign prior to transfer from the Tank Operations Contractor to the feed receipt vessels inside the Pretreatment Facility. The Waste Feed Qualification Program Plan describes the three components of waste feed qualification: 1. Demonstrate compliance with the waste acceptance criteria 2. Determine waste processability 3. Test unit operations at laboratory scale. The glass fabrication unit operation is the final step in the processmore » demonstration portion of the waste feed qualification process. This unit operation generally consists of combining each of the waste feed streams (high-level waste (HLW) and low-activity waste (LAW)) with Glass Forming Chemicals (GFCs), fabricating glass coupons, performing chemical composition analysis before and after glass fabrication, measuring hydrogen generation rate either before or after glass former addition, measuring rheological properties before and after glass former addition, and visual observation of the resulting glass coupons. Critical aspects of this unit operation are mixing and sampling of the waste and melter feeds to ensure representative samples are obtained as well as ensuring the fabrication process for the glass coupon is adequate. Testing was performed using a range of simulants (LAW and HLW simulants), and these simulants were mixed with high and low bounding amounts of GFCs to evaluate the mixing, sampling, and glass preparation steps in shielded cells using laboratory techniques. The tests were performed with off-the-shelf equipment at the Savannah River National Laboratory (SRNL) that is similar to equipment used in the SRNL work during qualification of waste feed for the Defense Waste Processing Facility (DWPF) and other waste treatment facilities at

  2. Proposed acceptance, qualification, and characterization tests for thin-film PV modules

    NASA Technical Reports Server (NTRS)

    Waddington, D.; Mrig, L.; Deblasio, R.; Ross, R.

    1988-01-01

    Details of a proposed test program for PV thin-film modules which the Department of Energy has directed the Solar Energy Research Institute (SERI) to prepare are presented. Results of one of the characterization tests that SERI has performed are also presented. The objective is to establish a common approach to testing modules that will be acceptable to both users and manufacturers. The tests include acceptance, qualification, and characterization tests. Acceptance tests verify that randomly selected modules have similar characteristics. Qualification tests are based on accelerated test methods designed to simulate adverse conditions. Characterization tests provide data on performance in a predefined environment.

  3. SP-100 flight qualification testing assessment

    NASA Technical Reports Server (NTRS)

    Jeanmougin, Nanette M.; Moore, Roger M.; Wait, David L.; Jacox, Michael G.

    1988-01-01

    The SP-100 is a compact space power system driven by a nuclear reactor that provides 100 kWe to the user at 200 VDC. The thermal energy generated by the nuclear reactor is converted into electrical energy by passive thermoelectric devices. Various options for tailoring the MIL-STD-1540B guidelines to the SP-100 nuclear power system are discussed. This study aids in selecting the appropriate qualification test program based on the cost, schedule, and test effectiveness of the various options.

  4. Qualification tests for {sup 192}Ir sealed sources

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Iancso, Georgeta, E-mail: georgetaiancso@yahoo.com; Iliescu, Elena, E-mail: georgetaiancso@yahoo.com; Iancu, Rodica, E-mail: georgetaiancso@yahoo.com

    This paper describes the results of qualification tests for {sup 192}Ir sealed sources, available in Testing and Nuclear Expertise Laboratory of National Institute for Physics and Nuclear Engineering 'Horia Hulubei' (I.F.I.N.-HH), Romania. These sources had to be produced in I.F.I.N.-HH and were tested in order to obtain the authorization from The National Commission for Nuclear Activities Control (CNCAN). The sources are used for gammagraphy procedures or in gammadefectoscopy equipments. Tests, measurement methods and equipments used, comply with CNCAN, AIEA and International Quality Standards and regulations. The qualification tests are: 1. Radiological tests and measurements: dose equivalent rate at 1 m;more » tightness; dose equivalent rate at the surface of the transport and storage container; external unfixed contamination of the container surface. 2. Mechanical and climatic tests: thermal shock; external pressure; mechanic shock; vibrations; boring; thermal conditions for storage and transportation. Passing all tests, it was obtained the Radiological Security Authorization for producing the {sup 192}Ir sealed sources. Now IFIN-HH can meet many demands for this sealed sources, as the only manufacturer in Romania.« less

  5. 78 FR 25488 - Qualification Tests for Safety-Related Actuators in Nuclear Power Plants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0079] Qualification Tests for Safety-Related Actuators in... regulatory guide (DG), DG-1235, ``Qualification Tests for Safety-Related Actuators in Nuclear Power Plants...-251- 7495, email: [email protected] . Both of the Office of Nuclear Regulatory Research, U.S. Nuclear...

  6. Qualification testing of flat-plate photovoltaic modules

    NASA Technical Reports Server (NTRS)

    Hoffman, A. R.; Griffith, J. S.; Ross, R. G., Jr.

    1982-01-01

    The placement of photovoltaic modules in various applications, in climates and locations throughout the world, results in different degrees and combinations of environmental and electrical stress. Early detection of module reliability deficiencies via laboratory testing is necessary for achieving long, satisfactory field service. This overview paper describes qualification testing techniques being used in the US Department of Energy's flat-plate terrestrial photovoltaic development program in terms of their significance, rationale for specified levels and durations, and test results.

  7. APA's Guidelines for Test User Qualifications: An Executive Summary.

    ERIC Educational Resources Information Center

    Turner, Samuel M.; DeMers, Stephen T.; Fox, Heather Roberts; Reed, Geoffrey M.

    2001-01-01

    Describes the American Psychological Association's (APA's) development of the Task Force on Test User Qualifications, explaining the APA's purpose in developing guidelines for the use of psychological tests. Highlights the historical background, the scope of the guidelines, generic knowledge and skills considered important for good test use, and…

  8. Structural Qualification Testing of the WindSat Payload Using Sine Bursts Near Structural Resonance

    NASA Technical Reports Server (NTRS)

    Pontius, Jim; Barnes, Donald; Broduer, Steve (Technical Monitor)

    2001-01-01

    Sine burst tests are often used for structural qualification of space flight hardware. In most instances, the driving frequency of the shaker is specified far below the structure's first resonant mode, such that the entire test article sees uniform acceleration. For large structures, this limits qualification testing to lower parts of the structure, or else it over-tests the lower structure to achieve qualification of the upper structure. The WindSat payload, a 10.5 foot tall graphite/epoxy, titanium, and aluminum radiometer, experiences accelerations at the six foot diameter reflector nearly four times that at the spacecraft interface. Due to size of the payload, the number of bonded joints, and the lightweight reflector support structure design and construction, using static pull testing to qualify all of the bonded joints in the upper structure would result in large, expensive, and extensive test fixturing. Sine burst testing near the first two structural resonant modes was performed on the WindSat payload to achieve the correct load factor distribution up the stack for structural qualification. In this presentation, how finite element method (FEM) sine burst predictions were used in conjunction with low level random and sine burst tests to achieve correct qualification test load factor distribution on the WindSat payload is discussed. Also presented is the risk mitigation approach for using the uncorrelated FEM in this procedure.

  9. The BepiColombo Spacecraft: The Mercury Transfer Module Structure Qualification Test Campaign Description

    NASA Astrophysics Data System (ADS)

    Martin Zurdo, M. J.

    2012-07-01

    The BepiColombo is a space mission to Mercury (ESA in cooperation with Japan Aerospace Exploration Agency). The spacecraft consist of three different structures: two orbiters responsible for the scientific mission (MPO and MMO) and one service module, Mercury Transfer Module (MTM), which provides propulsion and services during the journey to Mercury. Taking into account only the MTM structure, the companies involved are ASTRIUM GERMANY acting as the prime contractor and ASTRIUM UK acting as the co- prime contractor company. EADS CASA Espacio (ECE) in Spain is the company responsible for the final design, manufacturing and qualification of the MTM structure. The test campaign specimen is the MTM core structure, which corresponds to the central cone with the structure floors, shear panels and tank support structure. This test campaign qualifies the primary load path and its primary interfaces; the rest of the MTM structure is qualified by system level vibration test. In order to qualify the MTM structure, three different kinds of qualification tests have been performed: stiffness test, global strength test and local tests in different specific areas. The most relevant test during the campaign is the global strength test case, in which several external loads are introduced (different interfaces) simulating the load introduction for a selected critical flight case. There are two important items in the qualification test campaign: 1. The instrumentation of the structure, with two main functions: to control the specimen under test loads, and to demonstrate the qualification of the structure. 2. The set-up structure, designed by ECE to allow the correct load introduction on each testing case during the whole test campaign. This paper describes the MTM structure test campaign from the definition of the loads applied in each test to the qualification of the complete structure.

  10. Issues Related to Large Flight Hardware Acoustic Qualification Testing

    NASA Technical Reports Server (NTRS)

    Kolaini, Ali R.; Perry, Douglas C.; Kern, Dennis L.

    2011-01-01

    The characteristics of acoustical testing volumes generated by reverberant chambers or a circle of loudspeakers with and without large flight hardware within the testing volume are significantly different. The parameters attributing to these differences are normally not accounted for through analysis or acoustic tests prior to the qualification testing without the test hardware present. In most cases the control microphones are kept at least 2-ft away from hardware surfaces, chamber walls, and speaker surfaces to minimize the impact of the hardware in controlling the sound field. However, the acoustic absorption and radiation of sound by hardware surfaces may significantly alter the sound pressure field controlled within the chamber/speaker volume to a given specification. These parameters often result in an acoustic field that may provide under/over testing scenarios for flight hardware. In this paper the acoustic absorption by hardware surfaces will be discussed in some detail. A simple model is provided to account for some of the observations made from Mars Science Laboratory spacecraft that recently underwent acoustic qualification tests in a reverberant chamber.

  11. Qualification testing and electrical measurement experience: A manufacturer's view

    NASA Astrophysics Data System (ADS)

    Arnett, J. C.; Cooley, J. E.; Wingert, T. L.

    1983-11-01

    ARCO Solar's experiences as a participant in an industry-utility-government environmental qualification team examining photovoltaic devices are discussed. Included is an assessment of the applicability, completeness and appropriateness of the testing procedures and of the acceptance criteria for megawatt-sized procurements for utilities. Like the stand-alone users, the utility industry is interested in obtaining low costs, but additional concerns exist related to reliability and durability, safety, grounding and overall system criteria including performance prediction (related to output power acceptance testing), power quality and dispatchability. For purposes of this first major purchase of photovoltaic modules and panels by the utility industry, there was a carry-over of the JPL specifications. The need exists for futher development, assessement, and selection of qualification and testing standards and evaluation criteria specifically addressing these additional concerns for utility-connected PV power-plant applications.

  12. Qualification testing and electrical measurement experience: A manufacturer's view

    NASA Technical Reports Server (NTRS)

    Arnett, J. C.; Cooley, J. E.; Wingert, T. L.

    1983-01-01

    ARCO Solar's experiences as a participant in an industry-utility-government environmental qualification team examining photovoltaic devices are discussed. Included is an assessment of the applicability, completeness and appropriateness of the testing procedures and of the acceptance criteria for megawatt-sized procurements for utilities. Like the stand-alone users, the utility industry is interested in obtaining low costs, but additional concerns exist related to reliability and durability, safety, grounding and overall system criteria including performance prediction (related to output power acceptance testing), power quality and dispatchability. For purposes of this first major purchase of photovoltaic modules and panels by the utility industry, there was a carry-over of the JPL specifications. The need exists for futher development, assessement, and selection of qualification and testing standards and evaluation criteria specifically addressing these additional concerns for utility-connected PV power-plant applications.

  13. Qualification and Flight Test of Non-Chrome Primers for C-130 Aircraft

    DTIC Science & Technology

    2011-08-17

    system  Significant hexavalent chrome reduction in finish system  Potential exposure level of spray applied chromated conversion coating not as...Lockheed Martin Aeronautics Company Qualification and Flight Test of Non- Chrome Primers for C-130 Aircraft Scott Jones Lockheed Martin...00-2011 to 00-00-2011 4. TITLE AND SUBTITLE Qualification and Flight Test of Non- Chrome Primers for C-130 Aircraft 5a. CONTRACT NUMBER 5b. GRANT

  14. REPORT OF THE QUALIFICATION TESTING OF SNAP 10A FUSISTORS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holtwick, J.S. III; Nowell, V.P.

    1963-07-31

    Qualification testing of SNAP 10A fusistors was performed. Test operations included: visual inspection, insulation resistance, dielectric strength, and d-c resistance testing prior to subjecting the fusisters to environmental testing; opening-time testing prior to, during, and following vacuum and temperature testing; and insulation resistance, dielectric strength, and d-c resistance testing following environmental applications of temperature, vacuum, and sinusoidal vibration. (auth)

  15. Qualification test and analysis report: Solar collectors

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Test results show that the Owens-Illinois Sunpak TM Model SEC 601 air-cooled collector meets the national standards and codes as defined in the Subsystem Peformance Specification and Verification Plan of NASA/MSFC, dated October 28, 1976. The program calls for the development, fabrication, qualification and delivery of an air-cooled solar collector for solar heating, combined heating and cooling, and/or hot water systems.

  16. Qualification test unit slide stainer (Beckman P/N 673753)

    NASA Technical Reports Server (NTRS)

    Bernier, P. S.

    1972-01-01

    Specifications for a slide stainer unit for the Skylab program are presented. The qualification test slide stainer was designed to be a self-contained system capable of performing an eight-step Gram stain of microorganisms and a Wright's stain of blood smears.

  17. Environmental testing of block 3 solar cell modules. Part 1: Qualification testing of standard production modules

    NASA Technical Reports Server (NTRS)

    Griffith, J. S.

    1979-01-01

    Qualification tests of solar cell modules are described. These modules continue to show improvement over earlier type modules tested. Cell cracking and delamination are less prevalent, and interconnect problems and electrical degradation from environmental testing are now rare.

  18. Process qualification and testing of LENS deposited AY1E0125 D-bottle brackets.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Atwood, Clinton J.; Smugeresky, John E.; Jew, Michael

    2006-11-01

    The LENS Qualification team had the goal of performing a process qualification for the Laser Engineered Net Shaping{trademark}(LENS{reg_sign}) process. Process Qualification requires that a part be selected for process demonstration. The AY1E0125 D-Bottle Bracket from the W80-3 was selected for this work. The repeatability of the LENS process was baselined to determine process parameters. Six D-Bottle brackets were deposited using LENS, machined to final dimensions, and tested in comparison to conventionally processed brackets. The tests, taken from ES1E0003, included a mass analysis and structural dynamic testing including free-free and assembly-level modal tests, and Haversine shock tests. The LENS brackets performedmore » with very similar characteristics to the conventionally processed brackets. Based on the results of the testing, it was concluded that the performance of the brackets made them eligible for parallel path testing in subsystem level tests. The testing results and process rigor qualified the LENS process as detailed in EER200638525A.« less

  19. 49 CFR 178.33b-7 - Design qualification test.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Design qualification test. 178.33b-7 Section 178.33b-7 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR PACKAGINGS Specifications for Inside Containers, and...

  20. 46 CFR 54.20-5 - Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Welding qualification tests and production testing... OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Fabrication by Welding § 54.20-5 Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48). (a...

  1. 46 CFR 54.20-5 - Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Welding qualification tests and production testing... OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Fabrication by Welding § 54.20-5 Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48). (a...

  2. 46 CFR 54.20-5 - Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Welding qualification tests and production testing... OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Fabrication by Welding § 54.20-5 Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48). (a...

  3. 46 CFR 54.20-5 - Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Welding qualification tests and production testing... OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Fabrication by Welding § 54.20-5 Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48). (a...

  4. 46 CFR 54.20-5 - Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Welding qualification tests and production testing... OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Fabrication by Welding § 54.20-5 Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48). (a...

  5. Qualification of safety-related electrical equipment in France. Methods, approach and test facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Raimondo, E.; Capman, J.L.; Herovard, M.

    1985-05-01

    Requirements for qualification of electrical equipment used in French-built nuclear power plants are stated in a national code, the RCC-E, or Regles de Construction et de Conception des Materiels Electriques. Under the RCC-E, safety related equipment is assigned to one of three different categories, according to location in the plant and anticipated normal, accident and post-accident behavior. Qualification tests differ for each category and procedures range in scope from the standard seismic test to the highly stringent VISA program, which specifies a predetermined sequence of aging, radiation, seismic and simulated accident testing. A network of official French test facilities wasmore » developed specifically to meet RCC-E requirements.« less

  6. Space Qualification Test of a-Silicon Solar Cell Modules

    NASA Technical Reports Server (NTRS)

    Kim, Q.; Lawton, R. A.; Manion, S. J.; Okuno, J. O.; Ruiz, R. P.; Vu, D. T.; Vu, D. T.; Kayali, S. A.; Jeffrey, F. R.

    2004-01-01

    The basic requirements of solar cell modules for space applications are generally described in MIL-S-83576 for the specific needs of the USAF. However, the specifications of solar cells intended for use on space terrestrial applications are not well defined. Therefore, this qualifications test effort was concentrated on critical areas specific to the microseismometer probe which is intended to be included in the Mars microprobe programs. Parameters that were evaluated included performance dependence on: illuminating angles, terrestrial temperatures, lifetime, as well as impact landing conditions. Our qualification efforts were limited to these most critical areas of concern. Most of the tested solar cell modules have met the requirements of the program except the impact tests. Surprisingly, one of the two single PIN 2 x 1 amorphous solar cell modules continued to function even after the 80000G impact tests. The output power parameters, Pout, FF, Isc and Voc, of the single PIN amorphous solar cell module were found to be 3.14 mW, 0.40, 9.98 mA and 0.78 V, respectively. These parameters are good enough to consider the solar module as a possible power source for the microprobe seismometer. Some recommendations were made to improve the usefulness of the amorphous silicon solar cell modules in space terrestrial applications, based on the results obtained from the intensive short term lab test effort.

  7. Development and qualification testing of a laser-ignited, all-secondary (DDT) detonator

    NASA Technical Reports Server (NTRS)

    Blachowski, Thomas J.; Krivitsky, Darrin Z.; Tipton, Stephen

    1994-01-01

    The Indian Head Division, Naval Surface Warfare Center (IHDIV, NSWC) is conducting a qualification program for a laser-ignited, all-secondary (DDT) explosive detonator. This detonator was developed jointly by IHDIV, NSWC and the Department of Energy's EG&G Mound Applied Technologies facility in Miamisburg, Ohio to accept a laser initiation signal and produce a fully developed shock wave output. The detonator performance requirements were established by the on-going IHDIV, NSWC Laser Initiated Transfer Energy Subsystem (LITES) advanced development program. Qualification of the detonator as a component utilizing existing military specifications is the selected approach for this program. The detonator is a deflagration-to-detonator transfer (DDT) device using a secondary explosive, HMX, to generate the required shock wave output. The prototype development and initial system integration tests for the LITES and for the detonator were reported at the 1992 International Pyrotechnics Society Symposium and at the 1992 Survival and Flight Equipment National Symposium. Recent results are presented for the all-fire sensitivity and qualification tests conducted at two different laser initiation pulses.

  8. 30 CFR 281.4 - Qualifications of lessees.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Qualifications of lessees. 281.4 Section 281.4 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE LEASING OF MINERALS OTHER THAN OIL, GAS, AND SULPHUR IN THE OUTER CONTINENTAL SHELF General § 281.4 Qualifications of...

  9. Infrared Heater Used in Qualification Testing of International Space Station Radiators

    NASA Technical Reports Server (NTRS)

    Ziemke, Robert A.

    2004-01-01

    Two heat rejection radiator systems for the International Space Station (ISS) have undergone thermal vacuum qualification testing at the NASA Glenn Research Center (GRC), Plum Brook Station, Sandusky, Ohio. The testing was performed in the Space Power Facility (SPF), the largest thermal vacuum chamber in the world. The heat rejection system radiator was tested first; it removes heat from the ISS crew living quarters. The second system tested was the photovoltaic radiator (PVR), which rejects heat from the ISS photovoltaic arrays and the electrical power-conditioning equipment. The testing included thermal cycling, hot- and cold-soaked deployments, thermal gradient deployments, verification of the onboard heater controls, and for the PVR, thermal performance tests with ammonia flow. Both radiator systems are orbital replacement units for ease of replacement on the ISS. One key to the success of these tests was the performance of the infrared heater system. It was used in conjunction with a gaseous-nitrogen-cooled cryoshroud in the SPF vacuum chamber to achieve the required thermal vacuum conditions for the qualification tests. The heater, which was designed specifically for these tests, was highly successful and easily met the test requirements. This report discusses the heating requirements, the heater design features, the design approach, and the mathematical basis of the design.

  10. Testing in Support of Space Fission System Development and Qualification

    NASA Technical Reports Server (NTRS)

    Houts, Mike; Bragg-Sitton, Shannon; Garber, Anne; Godfrey, Tom; Martin, Jim; Pearson, Boise; Webster, Kenny

    2007-01-01

    Extensive data would be required for the qualification of a fission surface power (FSP) system. The strategy for qualifying a FSP system could have a significant programmatic impact. This paper explores potential options that could be used for qualifying FSP systems, including cost-effective means for obtaining required data. three methods for obtaining qualification data are analysis, non-nuclear testing, and nuclear testing. It has been over 40 years since the US qualified a space reactor for launch. During that time, advances have been made related to all three methods. Perhaps the greatest advancement has occurred in the area of computational tools for design and analysis. Tools that have been developed, coupled with modem computers, would have a significant impact on a FSP qualification. This would be especially true for systems with materials and fuels operating well within temperature, irradiation damage, and burnup limits. The ability to perform highly realistic non-nuclear testing has also advanced throughout the past four decades. Instrumented thermal simulators were developed during the 1970s and 1980s to assist in the development, operation, and assessment of terrestrial fission systems. Instrumented thermal simulators optimized for assisting in the development, operation, and assessment of modem FSP systems have been under development (and utilized) since 1998. These thermal simulators enable heat from fission to be closely mimicked (axial power profile, radial power profile, temperature, heat flux, etc.} and extensive data to be taken from the core region. Both steady-state and transient operation can be tested. For transient testing, reactivity feedback is calculated (or measured in cold/warm criticals) based on reactor temperature and/or dimensional changes. Pin power during a transient is then calculated based on the reactivity feedback that would occur given measured values of temperature and/or dimensional change. In this way nonnuclear testing

  11. Development of electrical test procedures for qualification of spacecraft against EID. Volume 2: Review and specification of test procedures

    NASA Technical Reports Server (NTRS)

    Wilkenfeld, J. M.; Harlacher, B. L.; Mathews, D.

    1982-01-01

    A combined experimental and analytical program to develop system electrical test procedures for the qualification of spacecraft against damage produced by space-electron-induced discharges (EID) occurring on spacecraft dielectric outer surfaces is described. A review and critical evaluation of possible approaches to qualify spacecraft against space electron-induced discharges (EID) is presented. A variety of possible schemes to simulate EID electromagnetic effects produced in spacecraft was studied. These techniques form the principal element of a provisional, recommended set of test procedures for the EID qualification spacecraft. Significant gaps in our knowledge about EID which impact the final specification of an electrical test to qualify spacecraft against EID are also identified.

  12. Space Qualification Test of a-Silicon Solar Cell Modules

    NASA Technical Reports Server (NTRS)

    Kim, Q.; Lawton, R. A.; Manion, S. J.; Okuno, J. O.; Ruiz, R. P.; Vu, D. T.; Kayali, S. A.; Jeffrey, F. R.

    1997-01-01

    The basic requirement of solar cell modules for space applications are generally described in MIL-S-83576 for the specific needs of the USAF. However, the specifications of solar cells intended for use on space terrestrial applications are not well defined. Therefore this qualification test effort was concentrated on critical areas specific to the microseismometer probe which is intended to be included in the Mars microprobe programs.

  13. M-52 spray booth qualification test

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The procedures, performance, and results obtained from the M-52 spray booth qualification test are documented. The test was conducted at Thiokol Corporation, Space Operations, M-52 Inert Parts Preparation facility. The purpose of this testing sequence was to ensure the spray booth would produce flight qualified hardware. The testing sequence was conducted in two series. The first series was conducted under CTP-0142, Revision 1. The second series was conducted in accordance with CTP-0142, Revision 2. The test sequence started with CTP-0142, Revision 1. The series consisted of the contamination removal test and the performance test. The contamination removal test was used to assess the Teflon level in the spray booth. The performance test consisted of painting and Chemloking a forward dome inside the spray booth per flight procedures. During the performance test, two sets of witness panels (case/insulation and steel/epoxy/steel) were prepared and pull tested. The CTP-0142, Revision 2, series of testing consisted of re-testing the steel/epoxy/steel witness panels. The pull tests analysis indicates the results of the tensile tests were comparable to the systems tunnel witness panel database. The exposed panel set and the control panel set average tensile values were above the 1-basis lower limits established on the systems tunnel witness panel database. It is recommended that the M-52 spray booth be qualified for producing flight hardware.

  14. Qualification test of the Ross Double Planetary Mixer

    NASA Technical Reports Server (NTRS)

    Lueders, Kurt F.

    1993-01-01

    This test report describes the qualification test of the Ross Double Planetary Mixer used to mix room temperature vulcanized (RTV) silicone (Dow Corning 90-006-2) for the redesigned solid rocket motor (RSRM) nozzle joints. Testing was completed 18 June 1993 in the M-113A Nozzle Fabrication Facility at Thiokol Corporation, Space Operations, Brigham City, Utah. The Ross mixer provides better mixing and better control on temperature and humidity, resulting in better quality RTV and a longer usable pot life. The test began on 3 May 1993 and was stopped due to operator error during the tensile strength and elongation testing. Specimens were ruined without gathering any useful data. A 'no test' was declared, the problem was remedied, and the test was re-run with MSFC approval. The test was run and all pass/fail criteria were met, most with a considerable margin. The Ross Double Planetary Mixer met all certification objectives and is recommended for immediate use for mixing RTV silicone for RSRM nozzle joints.

  15. Space flight requirements for fiber optic components: qualification testing and lessons learned

    NASA Astrophysics Data System (ADS)

    Ott, Melanie N.; Jin, Xiaodan Linda; Chuska, Richard; Friedberg, Patricia; Malenab, Mary; Matuszeski, Adam

    2006-04-01

    "Qualification" of fiber optic components holds a very different meaning than it did ten years ago. In the past, qualification meant extensive prolonged testing and screening that led to a programmatic method of reliability assurance. For space flight programs today, the combination of using higher performance commercial technology, with shorter development schedules and tighter mission budgets makes long term testing and reliability characterization unfeasible. In many cases space flight missions will be using technology within years of its development and an example of this is fiber laser technology. Although the technology itself is not a new product the components that comprise a fiber laser system change frequently as processes and packaging changes occur. Once a process or the materials for manufacturing a component change, even the data that existed on its predecessor can no longer provide assurance on the newer version. In order to assure reliability during a space flight mission, the component engineer must understand the requirements of the space flight environment as well as the physics of failure of the components themselves. This can be incorporated into an efficient and effective testing plan that "qualifies" a component to specific criteria defined by the program given the mission requirements and the component limitations. This requires interaction at the very initial stages of design between the system design engineer, mechanical engineer, subsystem engineer and the component hardware engineer. Although this is the desired interaction what typically occurs is that the subsystem engineer asks the components or development engineers to meet difficult requirements without knowledge of the current industry situation or the lack of qualification data. This is then passed on to the vendor who can provide little help with such a harsh set of requirements due to high cost of testing for space flight environments. This presentation is designed to guide the

  16. Space Flight Requirements for Fiber Optic Components; Qualification Testing and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Ott, Melanie N.; Jin, Xiaodan Linda; Chuska, Richard; Friedberg, Patricia; Malenab, Mary; Matuszeski, Adam

    2007-01-01

    "Qualification" of fiber optic components holds a very different meaning than it did ten years ago. In the past, qualification meant extensive prolonged testing and screening that led to a programmatic method of reliability assurance. For space flight programs today, the combination of using higher performance commercial technology, with shorter development schedules and tighter mission budgets makes long term testing and reliability characterization unfeasible. In many cases space flight missions will be using technology within years of its development and an example of this is fiber laser technology. Although the technology itself is not a new product the components that comprise a fiber laser system change frequently as processes and packaging changes occur. Once a process or the materials for manufacturing a component change, even the data that existed on its predecessor can no longer provide assurance on the newer version. In order to assure reliability during a space flight mission, the component engineer must understand the requirements of the space flight environment as well as the physics of failure of the components themselves. This can be incorporated into an efficient and effective testing plan that "qualifies" a component to specific criteria defined by the program given the mission requirements and the component limitations. This requires interaction at the very initial stages of design between the system design engineer, mechanical engineer, subsystem engineer and the component hardware engineer. Although this is the desired interaction what typically occurs is that the subsystem engineer asks the components or development engineers to meet difficult requirements without knowledge of the current industry situation or the lack of qualification data. This is then passed on to the vendor who can provide little help with such a harsh set of requirements due to high cost of testing for space flight environments. This presentation is designed to guide the

  17. Sensor Data Qualification Technique Applied to Gas Turbine Engines

    NASA Technical Reports Server (NTRS)

    Csank, Jeffrey T.; Simon, Donald L.

    2013-01-01

    This paper applies a previously developed sensor data qualification technique to a commercial aircraft engine simulation known as the Commercial Modular Aero-Propulsion System Simulation 40,000 (C-MAPSS40k). The sensor data qualification technique is designed to detect, isolate, and accommodate faulty sensor measurements. It features sensor networks, which group various sensors together and relies on an empirically derived analytical model to relate the sensor measurements. Relationships between all member sensors of the network are analyzed to detect and isolate any faulty sensor within the network.

  18. Testing in Support of Fission Surface Power System Qualification

    NASA Technical Reports Server (NTRS)

    Houts, Mike; Bragg-Sitton, Shannon; Godfroy, Tom; Martin, Jim; Pearson, Boise; VanDyke, Melissa

    2007-01-01

    The strategy for qualifying a FSP system could have a significant programmatic impact. The US has not qualified a space fission power system since launch of the SNAP-10A in 1965. This paper explores cost-effective options for obtaining data that would be needed for flight qualification of a fission system. Qualification data could be obtained from both nuclear and non-nuclear testing. The ability to perform highly realistic nonnuclear testing has advanced significantly throughout the past four decades. Instrumented thermal simulators were developed during the 1970s and 1980s to assist in the development, operation, and assessment of terrestrial fission systems. Instrumented thermal simulators optimized for assisting in the development, operation, and assessment of modern FSP systems have been under development (and utilized) since 1998. These thermal simulators enable heat from fission to be closely mimicked (axial power profile, radial power profile, temperature, heat flux, etc.) and extensive data to be taken from the core region. For transient testing, pin power during a transient is calculated based on the reactivity feedback that would occur given measured values of test article temperature and/or dimensional changes. The reactivity feedback coefficients needed for the test are either calculated or measured using cold/warm zero-power criticals. In this way non-nuclear testing can be used to provide very realistic information related to nuclear operation. Non-nuclear testing can be used at all levels, including component, subsystem, and integrated system testing. FSP fuels and materials are typically chosen to ensure very high confidence in operation at design burnups, fluences, and temperatures. However, facilities exist (e.g. ATR, HFIR) for affordably performing in-pile fuel and materials irradiations, if such testing is desired. Ex-core materials and components (such as alternator materials, control drum drives, etc.) could be irradiated in university or DOE

  19. Development and qualification of the US Cruise Missile Propulsion System

    NASA Astrophysics Data System (ADS)

    Reardon, William H.; Cifone, Anthony J.

    1992-09-01

    This paper provides a description of the very successful Cruise Missile gas turbine propulsion program managed by the United States Department of Defense. The paper contains a summary of the procurement process, the technical and programmatic milestones, issues and challenges, and lessons learned. In the past fifteen years, testing at the Naval Air Propulsion Center has included over 800 cruise engine development and component substantiation efforts spanning the engine specification qualification requirements. This paper provides a detailed account of environmental test techniques used to qualify the F107 family of gas turbine engines which propel the U.S. Cruise Missile. In addition, a missile freestream flight test simulation for the TOMAHAWK Cruise Missile is discussed along with current and future program efforts.

  20. Thermal Protection System Development, Testing and Qualification

    NASA Astrophysics Data System (ADS)

    Venkatapathy, Ethiraj; Arnold, James; Laub, B.; Hartman, G. J.

    The science community currently has interest in planetary entry probe missions to improve our understanding of the atmospheres of Saturn and Venus [1,2]. As in the case of the Galileo entry probe, such data are critical to the understanding of not only the individual planets but also to further knowledge regarding the formation of the solar system. It is believed that Saturn probes to depths corresponding to 10 bars will be sufficient [1] to provide the desired scientific data. The heating rates for the "shallow" Saturn probes and Venus are in the range of 2 - 5KW/cm2 . It is clear that new, mid-density Thermal Protection System (TPS) materials for such probes can be mission-enabling for mass efficiency [3] and also make the use of smaller vehicles possible from advancements in scientific instrumentation [4]. Past consideration of new Jovian multiprobe missions has been considered problematic without the Giant Planet Arcjet Facility that was used to qualify Carbon Phenolic for the Galileo Probe. This paper describes emerging TPS technology and the proposed use of an affordable, small 5 MW arc jet that can be used for TPS development in test gases appropriate for the aforementioned, new planetary probe applications. Emerging TPS technologies of interest include a mid-density, chopped molded carbon phenolic (CMCP) material around 0.8g/cc and a densified variant of phenolic impregnated carbon ablator (PICA) around 0.5g/cc. The small 5 MW arc jet facility, called the Development Arcjet Facility (DAF) and the methodology of testing TPS, both based on previous work, are discussed. Finally, the applications to Earth entry appropriate to speeds greater than lunar return (11km/s) are discussed as will facility-to-facility validation using air as a test gas. The use of other facilities for development, qualification and certification of TPS for Saturn and Venus is also discussed. [1] Atreya, S. K., et. al. Formation of Giant Planets and Their Atmospheres: Entry Probes for

  1. Use of proficiency test performance to determine clinical laboratory director qualifications.

    PubMed

    Howanitz, P J

    1988-04-01

    Many activities and policies influence laboratory test quality. Proficiency test results are one measure of laboratory quality, and during the past 25 years, five studies have examined the relationship of laboratory director educational requirements to proficiency test results. Data from three studies support the association between director qualifications and quality as measured by proficiency test performance, whereas no relationship was found in the other two studies. Possible reasons for conflicting results include differences in database size and demographics; in addition, proficiency test results may be inappropriate, although widely used, as the sole measure of laboratory director performance.

  2. Development of electrical test procedures for qualification of spacecraft against EID. Volume 1: The CAN test and other relevant data

    NASA Technical Reports Server (NTRS)

    Wilkenfeld, J. M.; Judge, R. J. R.; Harlacher, B. L.

    1982-01-01

    A combined experimental and analytical program to develop system electrical test procedures for the qualification of spacecraft against damage produced by space-electron-induced discharges (EID) occurring on spacecraft dielectric outer surfaces is described. The data on the response of a simple satellite model, called CAN, to electron-induced discharges is presented. The experimental results were compared to predicted behavior and to the response of the CAN to electrical injection techniques simulating blowoff and arc discharges. Also included is a review of significant results from other ground tests and the P78-2 program to form a data base from which is specified those test procedures which optimally simulate the response of spacecraft to EID. The electrical and electron spraying test data were evaluated to provide a first-cut determination of the best methods for performance of electrical excitation qualification tests from the point of view of simulation fidelity.

  3. Qualification flight tests of the Viking decelerator system.

    NASA Technical Reports Server (NTRS)

    Moog, R. D.; Bendura, R. J.; Timmons, J. D.; Lau, R. A.

    1973-01-01

    The Balloon Launched Decelerator Test (BLDT) series conducted at White Sands Missile Range (WSMR) during July and August of 1972 flight qualified the NASA Viking '75 decelerator system at conditions bracketing those expected for Mars. This paper discusses the decelerator system design requiremnts, compares the test results with prior work, and discusses significant considerations leading to successful qualification in earth's atmosphere. The Viking decelerator system consists of a single-stage mortar-deployed 53-foot nominal diameter disk-gap-band parachute. Full-scale parachutes were deployed behind a full-scale simulated Viking vehicle at Mach numbers from 0.47 to 2.18 and dynamic pressures from 6.9 to 14.6 psf. Analyses show that the system is qualified with sufficient margin to perform successfully for the Viking mission.

  4. Project FIRES. Volume 4: Prototype Protective Ensemble Qualification Test Report, Phase 1B

    NASA Technical Reports Server (NTRS)

    Abeles, F. J.

    1980-01-01

    The qualification testing of a prototype firefighter's protective ensemble is documented. Included are descriptions of the design requirements, the testing methods, and the test apparatus. The tests include measurements of individual subsystem characteristics in areas relating to both physical testing, such as heat, flame, impact penetration and human factors testing, such as dexterity, grip, and mobility. Also, measurements related to both physical and human factors testing of the complete ensemble, such as water protection, metabolic expenditures, and compatibility are considered.

  5. Qualification Tests of Micro-camera Modules for Space Applications

    NASA Astrophysics Data System (ADS)

    Kimura, Shinichi; Miyasaka, Akira

    Visual capability is very important for space-based activities, for which small, low-cost space cameras are desired. Although cameras for terrestrial applications are continually being improved, little progress has been made on cameras used in space, which must be extremely robust to withstand harsh environments. This study focuses on commercial off-the-shelf (COTS) CMOS digital cameras because they are very small and are based on an established mass-market technology. Radiation and ultrahigh-vacuum tests were conducted on a small COTS camera that weighs less than 100 mg (including optics). This paper presents the results of the qualification tests for COTS cameras and for a small, low-cost COTS-based space camera.

  6. Liquid Secondary Waste Grout Formulation and Waste Form Qualification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Um, Wooyong; Williams, B. D.; Snyder, Michelle M. V.

    This report describes the results from liquid secondary waste (LSW) grout formulation and waste form qualification tests performed at Pacific Northwest National Laboratory (PNNL) for Washington River Protection Solutions (WRPS) to evaluate new formulations for preparing a grout waste form with high-sulfate secondary waste simulants and the release of key constituents from these grout monoliths. Specific objectives of the LSW grout formulation and waste form qualification tests described in this report focused on five activities: 1.preparing new formulations for the LSW grout waste form with high-sulfate LSW simulants and solid characterization of the cured LSW grout waste form; 2.conducting themore » U.S. Environmental Protection Agency (EPA) Method 1313 leach test (EPA 2012) on the grout prepared with the new formulations, which solidify sulfate-rich Hanford Tank Waste Treatment and Immobilization Plant (WTP) off-gas condensate secondary waste simulant, using deionized water (DIW); 3.conducting the EPA Method 1315 leach tests (EPA 2013) on the grout monoliths made with the new dry blend formulations and three LSW simulants (242-A evaporator condensate, Environmental Restoration Disposal Facility (ERDF) leachate, and WTP off-gas condensate) using two leachants, DIW and simulated Hanford Integrated Disposal Facility (IDF) Site vadose zone pore water (VZPW); 4.estimating the 99Tc desorption K d (distribution coefficient) values for 99Tc transport in oxidizing conditions to support the IDF performance assessment (PA); 5.estimating the solubility of 99Tc(IV)-bearing solid phases for 99Tc transport in reducing conditions to support the IDF PA.« less

  7. Design, fabrication, test qualification and price analysis of a third generation solar cell module

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The design, fabrication, test, and qualification of a third generation intermediate load solar cell module are presented. A technical discussion of the detailed module design, preliminary design review, design modifications, and environmental testing are included. A standardized pricing system is utilized to establish the cost competitiveness of this module design.

  8. Development and Execution of a Large-scale DDT Tube Test for IHE Material Qualification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parker, Gary Robert; Broilo, Robert M.; Lopez-Pulliam, Ian Daniel

    Insensitive High Explosive (IHE) Materials are defined in Chapter IX of the DOE Explosive Safety Standard (DOE-STD-1212-2012) as being materials that are massdetonable explosives that are so insensitive that the probability of accidental initiation or transition from burning to detonation is negligible1. There are currently a number of tests included in the standard that are required to qualify a material as IHE, however, none of the tests directly evaluate for the transition from burning to detonation (aka deflagration-to-detonation transition, DDT). Currently, there is a DOE complex-wide effort to revisit the IHE definition in DOE-STD-1212-2012 and change the qualification requirements. Themore » proposal lays out a new approach, requiring fewer, but more appropriate tests, for IHE Material qualification. One of these new tests is the Deflagration-to-Detonation Test. According to the redefinition proposal, the purpose of the new deflagration-todetonation test is “to demonstrate that an IHE material will not undergo deflagration-to-detonation under stockpile relevant conditions of scale, confinement, and material condition. Inherent in this test design is the assumption that ignition does occur, with onset of deflagration. The test design will incorporate large margins and replicates to account for the stochastic nature of DDT events.” In short, the philosophy behind this approach is that if a material fails to undergo DDT in a significant over-test, then it is extremely unlikely to do so in realistic conditions. This effort will be valuable for the B61 LEP to satisfy their need qualify the new production lots of PBX 9502. The work described in this report is intended as a preliminary investigation to support the proposed design of an overly conservative, easily fielded DDT test for updated IHE Material Qualification standard. Specifically, we evaluated the aspects of confinement, geometry, material morphology and temperature. We also developed and tested a

  9. Reactor Testing and Qualification: Prioritized High-level Criticality Testing Needs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    S. Bragg-Sitton; J. Bess; J. Werner

    2011-09-01

    Researchers at the Idaho National Laboratory (INL) were tasked with reviewing possible criticality testing needs to support development of the fission surface power system reactor design. Reactor physics testing can provide significant information to aid in development of technologies associated with small, fast spectrum reactors that could be applied for non-terrestrial power systems, leading to eventual system qualification. Several studies have been conducted in recent years to assess the data and analyses required to design and build a space fission power system with high confidence that the system will perform as designed [Marcille, 2004a, 2004b; Weaver, 2007; Parry et al.,more » 2008]. This report will provide a summary of previous critical tests and physics measurements that are potentially applicable to the current reactor design (both those that have been benchmarked and those not yet benchmarked), summarize recent studies of potential nuclear testing needs for space reactor development and their applicability to the current baseline fission surface power (FSP) system design, and provide an overview of a suite of tests (separate effects, sub-critical or critical) that could fill in the information database to improve the accuracy of physics modeling efforts as the FSP design is refined. Some recommendations for tasks that could be completed in the near term are also included. Specific recommendations on critical test configurations will be reserved until after the sensitivity analyses being conducted by Los Alamos National Laboratory (LANL) are completed (due August 2011).« less

  10. Space Technology-5 Lithium-Ion Battery Design, Qualification and Integration and Testing

    NASA Technical Reports Server (NTRS)

    Rao, Gopalakishna M.; Stewart, Karen; Ameen, Syed; Banfield, Peter K.

    2005-01-01

    This document is a viewgraph presentation that reviews the Lithium Ion Battery for the Space Technology-5 (ST-5) mission. Included in the document is a review of the ST-5 Mission, a review of the battery requirements, a description of the battery and the battery materials. The testing and the integration and qualification data is reviewed.

  11. Test Purchaser Qualifications: Present Practice, Professional Needs, and a Proposed System. Issues in Scientific Psychology.

    ERIC Educational Resources Information Center

    Moreland, Kevin L.; And Others

    Three papers are included in this document. The first, "An Introduction to the Problem of Test User Qualifications," by Kevin L. Moreland, is a short history of the American Psychological Association (APA)/American Educational Research Association (AERA)/National Council on Measurement in Education (NCME) Working Group on Test User…

  12. Lightning arrestor connector lead magnesium niobate qualification pellet test procedures.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tuohig, W.; Mahoney, Patrick A.; Tuttle, Bruce Andrew

    2009-02-01

    Enhanced knowledge preservation for DOE DP technical component activities has recently received much attention. As part of this recent knowledge preservation effort, improved documentation of the sample preparation and electrical testing procedures for lead magnesium niobate--lead titanate (PMN/PT) qualification pellets was completed. The qualification pellets are fabricated from the same parent powders used to produce PMN/PT lightning arrestor connector (LAC) granules at HWF&T. In our report, the procedures for fired pellet surface preparation, electrode deposition, electrical testing and data recording are described. The dielectric measurements described in our report are an information only test. Technical reasons for selecting the electrodemore » material, electrode size and geometry are presented. The electrical testing is based on measuring the dielectric constant and dissipation factor of the pellet during cooling from 280 C to 220 C. The most important data are the temperature for which the peak dielectric constant occurs (Curie Point temperature) and the peak dielectric constant magnitude. We determined that the peak dielectric constant for our procedure would be that measured at 1 kHz at the Curie Point. Both the peak dielectric constant and the Curie point parameters provide semi-quantitative information concerning the chemical and microstructural homogeneity of the parent material used for the production of PMN/PT granules for LACs. Finally, we have proposed flag limits for the dielectric data for the pellets. Specifically, if the temperature of the peak dielectric constant falls outside the range of 250 C {+-} 30 C we propose that a flag limit be imposed that will initiate communication between production agency and design agency personnel. If the peak dielectric constant measured falls outside the range 25,000 {+-} 10,000 we also propose that a flag limit be imposed.« less

  13. 10 CFR 26.85 - Collector qualifications and responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Collector qualifications and responsibilities. 26.85 Section 26.85 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.85 Collector qualifications and responsibilities. (a) Urine collector qualifications. Urine...

  14. 10 CFR 26.85 - Collector qualifications and responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Collector qualifications and responsibilities. 26.85 Section 26.85 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.85 Collector qualifications and responsibilities. (a) Urine collector qualifications. Urine...

  15. 10 CFR 26.85 - Collector qualifications and responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Collector qualifications and responsibilities. 26.85 Section 26.85 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.85 Collector qualifications and responsibilities. (a) Urine collector qualifications. Urine...

  16. 10 CFR 26.85 - Collector qualifications and responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Collector qualifications and responsibilities. 26.85 Section 26.85 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.85 Collector qualifications and responsibilities. (a) Urine collector qualifications. Urine...

  17. 10 CFR 26.85 - Collector qualifications and responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Collector qualifications and responsibilities. 26.85 Section 26.85 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.85 Collector qualifications and responsibilities. (a) Urine collector qualifications. Urine...

  18. The Reliability of Results from National Tests, Public Examinations, and Vocational Qualifications in England

    ERIC Educational Resources Information Center

    He, Qingping; Opposs, Dennis

    2012-01-01

    National tests, public examinations, and vocational qualifications in England are used for a variety of purposes, including the certification of individual learners in different subject areas and the accountability of individual professionals and institutions. However, there has been ongoing debate about the reliability and validity of their…

  19. Environmental qualification testing of the prototype pool boiling experiment

    NASA Technical Reports Server (NTRS)

    Sexton, J. Andrew

    1992-01-01

    The prototype Pool Boiling Experiment (PBE) flew on the STS-47 mission in September 1992. This report describes the purpose of the experiment and the environmental qualification testing program that was used to prove the integrity of the prototype hardware. Component and box level vibration and thermal cycling tests were performed to give an early level of confidence in the hardware designs. At the system level, vibration, thermal extreme soaks, and thermal vacuum cycling tests were performed to qualify the complete design for the expected shuttle environment. The system level vibration testing included three axis sine sweeps and random inputs. The system level hot and cold soak tests demonstrated the hardware's capability to operate over a wide range of temperatures and gave the project team a wider latitude in determining which shuttle thermal altitudes were compatible with the experiment. The system level thermal vacuum cycling tests demonstrated the hardware's capability to operate in a convection free environment. A unique environmental chamber was designed and fabricated by the PBE team and allowed most of the environmental testing to be performed within the project's laboratory. The completion of the test program gave the project team high confidence in the hardware's ability to function as designed during flight.

  20. BSM Delta Qualification 2, volume 3, book 2

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This report, presented in three volumes, provides the results of a two-motor Delta Qualification 2 program conducted in 1993 to certify the following enhancements for incorporation into booster separation motor (BSM0 flight hardware: vulcanized-in-place nozzle aft closure insulation; new iso-static ATJ bulk graphite throat insert material, adhesive EA9394 for bonding the nozzle throat, igniter grain rod/centering insert/igniter case; deletion of the igniter adapter insulator ring; deletion of the igniter adapter/igniter case interface RTV; and deletion of loctite from igniter retainer plate threads. The enhancements above directly resulted from (1) the BSM total quality management (TQM) team initiatives to enhance the BSM producibility, and (2) the necessity to qualify new throat insert and adhesive systems to replace existing materials that will not be available. Testing was completed at both the component and motor levels. Component testing was accomplished to screen candidate materials (e.g., throat materials, adhesive systems) and to optimize processes (e.g., aft closure insulator vulcanization approach) prior to their incorporation into the test motors. Motor testing--consisting of two motors, randomly selected by USBI's on-site quality personnel from production lot AAY, which were modified to accept the enhancements -- was completed to provide the final qualification of the enhancements for incorporation into flight hardware. Volume 3, Book 2 provides various supporting documentation to the previous volumes with regards to the testing of the two Delta qualification units: data acceptance records, thermal conditioning analysis, igniter adapter thermal flake analysis, laboratory adhesive (EA-9394) qualification report, throat insert thermal/structural analysis, Delta Qualification Nonconformance Reports (NCR's), O-ring seating tests, and interim test report for vulcanization process qualification.

  1. EDS V25 containment vessel explosive qualification test report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rudolphi, John Joseph

    2012-04-01

    The V25 containment vessel was procured by the Project Manager, Non-Stockpile Chemical Materiel (PMNSCM) as a replacement vessel for use on the P2 Explosive Destruction Systems. It is the first EDS vessel to be fabricated under Code Case 2564 of the ASME Boiler and Pressure Vessel Code, which provides rules for the design of impulsively loaded vessels. The explosive rating for the vessel based on the Code Case is nine (9) pounds TNT-equivalent for up to 637 detonations. This limit is an increase from the 4.8 pounds TNT-equivalency rating for previous vessels. This report describes the explosive qualification tests thatmore » were performed in the vessel as part of the process for qualifying the vessel for explosive use. The tests consisted of a 11.25 pound TNT equivalent bare charge detonation followed by a 9 pound TNT equivalent detonation.« less

  2. 49 CFR 192.227 - Qualification of welders.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Qualification of welders. 192.227 Section 192.227 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM...

  3. 49 CFR 192.227 - Qualification of welders.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Qualification of welders. 192.227 Section 192.227 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM...

  4. RSRM nozzle actuator bracket/lug fracture mechanics qualification test

    NASA Technical Reports Server (NTRS)

    Kelley, Peggy

    1993-01-01

    This is the final report for the actuator bracket/lug fracture mechanics qualification test. The test plan (CTP-0071) outlined a two-phase test program designed to answer questions about the fracture criticality of the redesigned solid rocket motor (RSRM) nozzle actuator bracket. An analysis conducted using the NASA/FLAGRO fracture mechanics computer program indicated that the actuator bracket might be a fracture critical component. In the NASA/FLAGRO analysis, a simple lug model was used to represent the actuator bracket. It was calculated that the bracket would fracture if subjected to an actuator stall load in the presence of a 0.10 in. corner crack at the actuator attachment hole. The 0.10 in. crack size corresponds to the nondestructive inspection detectability limit for the actuator bracket. The inspection method used is the dye penetrant method. The actuator stall load (103,424 lb) is the maximum load which the actuator bracket is required to withstand during motor operation. This testing was designed to establish the accuracy of the analytical model and to directly determine whether the actuator bracket is capable of meeting fracture mechanics safe-life requirements.

  5. Compatibility of Space Nuclear Power Plant Materials in an Inert He/Xe Working Gas Containing Reactive Impurities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MM Hall

    2006-01-31

    A major materials selection and qualification issue identified in the Space Materials Plan is the potential for creating materials compatibility problems by combining dissimilar reactor core, Brayton Unit and other power conversion plant materials in a recirculating, inert He/Xe gas loop containing reactive impurity gases. Reported here are results of equilibrium thermochemical analyses that address the compatibility of space nuclear power plant (SNPP) materials in high temperature impure He gas environments. These studies provide early information regarding the constraints that exist for SNPP materials selection and provide guidance for establishing test objectives and environments for SNPP materials qualification testing.

  6. 30 CFR 281.4 - Qualifications of lessees.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Qualifications of lessees. 281.4 Section 281.4 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE LEASING OF MINERALS OTHER THAN OIL, GAS, AND SULPHUR IN THE OUTER CONTINENTAL SHELF...

  7. AGR-3/4 Final Data Qualification Report for ATR Cycles 151A through 155B-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pham, Binh T.

    2015-03-01

    This report provides the qualification status of experimental data for the entire Advanced Gas Reactor 3/4 (AGR 3/4) fuel irradiation. AGR-3/4 is the third in a series of planned irradiation experiments conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) for the AGR Fuel Development and Qualification Program, which supports development of the advanced reactor technology under the INL ART Technology Development Office (TDO). The main objective of AGR-3/4 irradiation is to provide a known source of fission products for subsequent transport through compact matrix and structural graphite materials due to the presence of designed-to-fail fuel particles.more » Full power irradiation of the AGR 3/4 test began on December 14, 2011 (ATR Cycle 151A), and was completed on April 12, 2014 (end of ATR Cycle 155B) after 369.1 effective full power days of irradiation. The AGR-3/4 test was in the reactor core for eight of the ten ATR cycles between 151A and 155B. During the unplanned outage cycle, 153A, the experiment was removed from the ATR northeast flux trap (NEFT) location and stored in the ATR canal. This was to prevent overheating of fuel compacts due to higher than normal ATR power during the subsequent Powered Axial Locator Mechanism cycle, 153B. The AGR 3/4 test was inserted back into the ATR NEFT location during the outage of ATR Cycle 154A on April 26, 2013. Therefore, the AGR-3/4 irradiation data received during these 2 cycles (153A and 153B) are irrelevant and their qualification status isnot included in this report. Additionally, during ATR Cycle 152A the ATR core ran at low power for a short enough duration that the irradiation data are not used for physics and thermal calculations. However, the qualification status of irradiation data for this cycle is still covered in this report. As a result, this report includes data from 8 ATR Cycles: 151A, 151B, 152A, 152B, 154A, 154B, 155A, and 155B, as recorded in the Nuclear Data Management and

  8. Requirements and test results for the qualification of thermal control coatings

    NASA Technical Reports Server (NTRS)

    Brzuskiewicz, J. E.; Zerlaut, G. A.; Lauder, K.; Miller, G. M.

    1988-01-01

    Paint type coatings are often used as engineering materials in critical satellite temperature control applications. The functional features of coatings used for temperature control purposes must remain stable throughout the satellite manufacturing process and the satellite mission. The selection of a particular coating depends on matching coating characteristics to mission requirements. The use of paint coatings on satellites, although having an extensive history, requires that the paint be qualified to each application on an individual basis. Thus, the qualification process through testing serves to ensure that paint coatings as engineering materials will fulfill design requirements.

  9. An automated qualification framework for the MeerKAT CAM (Control-And-Monitoring)

    NASA Astrophysics Data System (ADS)

    van den Heever, Lize; Marais, Neilen; Slabber, Martin

    2016-08-01

    This paper introduces and discusses the design of an Automated Qualification Framework (AQF) that was developed to automate as much as possible of the formal Qualification Testing of the Control And Monitoring (CAM) subsystem of the 64 dish MeerKAT radio telescope currently under construction in the Karoo region of South Africa. The AQF allows each Integrated CAM Test to reference the MeerKAT CAM requirement and associated verification requirement it covers and automatically produces the Qualification Test Procedure and Qualification Test Report from the test steps and evaluation steps annotated in the Integrated CAM Tests. The MeerKAT System Engineers are extremely happy with the AQF results, but mostly by the approach and process it enforces.

  10. Qualification test results for DOE solar photovoltaic flat panel procurement - PRDA 38

    NASA Technical Reports Server (NTRS)

    Griffith, J. S.

    1980-01-01

    Twelve types of prototypes modules for the DOE Photovoltaic Flat Panel Procurement (PRDA 38) were subjected to qualification tests at the Jet Propulsion Laboratory according to a new specification. Environmental exposures were carried out separately and included temperature cycling, humidity, wind simulation, and hail. The most serious problems discovered were reduced insulation resistance to ground and ground continuity of the metal frames, electrical degradation, erratic power readings, and delamination. The electrical and physical characteristics of the newly received modules are also given.

  11. Effluent Management Facility Evaporator Bottom-Waste Streams Formulation and Waste Form Qualification Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saslow, Sarah A.; Um, Wooyong; Russell, Renee L.

    This report describes the results from grout formulation and cementitious waste form qualification testing performed by Pacific Northwest National Laboratory (PNNL) for Washington River Protection Solutions, LLC (WRPS). These results are part of a screening test that investigates three grout formulations proposed for wide-range treatment of different waste stream compositions expected for the Hanford Effluent Management Facility (EMF) evaporator bottom waste. This work supports the technical development need for alternative disposition paths for the EMF evaporator bottom wastes and future direct feed low-activity waste (DFLAW) operations at the Hanford Site. High-priority activities included simulant production, grout formulation, and cementitious wastemore » form qualification testing. The work contained within this report relates to waste form development and testing, and does not directly support the 2017 Integrated Disposal Facility (IDF) performance assessment (PA). However, this work contains valuable information for use in PA maintenance past FY 2017 and future waste form development efforts. The provided results and data should be used by (1) cementitious waste form scientists to further the understanding of cementitious leach behavior of contaminants of concern (COCs), (2) decision makers interested in off-site waste form disposal, and (3) the U.S. Department of Energy, their Hanford Site contractors and stakeholders as they assess the IDF PA program at the Hanford Site. The results reported help fill existing data gaps, support final selection of a cementitious waste form for the EMF evaporator bottom waste, and improve the technical defensibility of long-term waste form risk estimates.« less

  12. Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Engineering Test Report: AMSU-A1 EOS Instrument, (S/N 202) Qualification Level Vibration Tests of August/September 1998, (S/O 565632, OC-417) Plus Addendum A

    NASA Technical Reports Server (NTRS)

    Heffer, R.

    1998-01-01

    The purpose of this report is to present a qualification level vibration testing performed on the S/N 202, EOS AMSU-A1 Instrument was vibration tested to qualification levels per the Ref. 1 shop order. The instrument withstood the 8 g sine sweep test, the 7.5 Grms random vibration test, and the 18.75 g sine burst test in each of the three orthogonal axes. Some loss of transmissibility, however, is seen in the lower reflector after Z-axis random vibration. The test sequence was not without incidence. Failure of Channel 7 in the Limited Performance Test (LPT) performed after completion of the 1 st (X-axis) axis vibration sequence, required replacement of the DRO and subsequent re-testing of the instrument. The post-vibration comprehensive performance test (CPT) was successfully run after completion of the three axes of vibration with the replacement component installed in the instrument. Passing the CPT signified the successful completion of the S/N 202 A1 qualification vibration testing.

  13. Qualification testing of fiber-based laser transmitters and on-orbit validation of a commercial laser system

    NASA Astrophysics Data System (ADS)

    Wright, M. W.; Wilkerson, M. W.; Tang, R. R.

    2017-11-01

    Qualification testing of fiber based laser transmitters is required for NASA's Deep Space Optical Communications program to mature the technology for space applications. In the absence of fully space qualified systems, commercial systems have been investigated in order to demonstrate the robustness of the technology. To this end, a 2.5 W fiber based laser source was developed as the transmitter for an optical communications experiment flown aboard the ISS as a part of a technology demonstration mission. The low cost system leveraged Mil Standard design principles and Telcordia certified components to the extent possible and was operated in a pressure vessel with active cooling. The laser was capable of high rate modulation but was limited by the mission requirements to 50 Mbps for downlinking stored video from the OPALS payload, externally mounted on the ISS. Environmental testing and space qualification of this unit will be discussed along with plans for a fully space qualified laser transmitter.

  14. Techniques for control of long-term reliability of complex integrated circuits. I - Reliability assurance by test vehicle qualification.

    NASA Technical Reports Server (NTRS)

    Van Vonno, N. W.

    1972-01-01

    Development of an alternate approach to the conventional methods of reliability assurance for large-scale integrated circuits. The product treated is a large-scale T squared L array designed for space applications. The concept used is that of qualification of product by evaluation of the basic processing used in fabricating the product, providing an insight into its potential reliability. Test vehicles are described which enable evaluation of device characteristics, surface condition, and various parameters of the two-level metallization system used. Evaluation of these test vehicles is performed on a lot qualification basis, with the lot consisting of one wafer. Assembled test vehicles are evaluated by high temperature stress at 300 C for short time durations. Stressing at these temperatures provides a rapid method of evaluation and permits a go/no go decision to be made on the wafer lot in a timely fashion.

  15. Options and Risk for Qualification of Electric Propulsion System

    NASA Technical Reports Server (NTRS)

    Bailey, Michelle; Daniel, Charles; Cook, Steve (Technical Monitor)

    2002-01-01

    Electric propulsion vehicle systems envelop a wide range of propulsion alternatives including solar and nuclear, which present unique circumstances for qualification. This paper will address the alternatives for qualification of electric propulsion spacecraft systems. The approach taken will be to address the considerations for qualification at the various levels of systems definition. Additionally, for each level of qualification the system level risk implications will be developed. Also, the paper will explore the implications of analysis verses test for various levels of systems definition, while retaining the objectives of a verification program. The limitations of terrestrial testing will be explored along with the risk and implications of orbital demonstration testing. The paper will seek to develop a template for structuring of a verification program based on cost, risk and value return. A successful verification program should establish controls and define objectives of the verification compliance program. Finally the paper will seek to address the political and programmatic factors, which may impact options for system verification.

  16. Joint helmet-mounted cueing system (JHMCS) helmet qualification testing requirements

    NASA Astrophysics Data System (ADS)

    Orf, Garry W.

    1998-08-01

    The Joint Helmet-Mounted Cueing System (JHMCS) program will provide capability to cue high off-boresight (HOBS) weapons to the operator's line of sight and to confirm weapon sensor LOS for the US Air Force and US Navy (USN) aircrew. This capability will ensure the USAF and USN pilots a first shot opportunity. The JHMCS incorporates an ejection-compatible helmet-mounted display system that will be installed on F- 15, F-16, F/A-18, and F-22 aircraft. The JHMCS includes a flight helmet with display optics, miniature cathode ray tube, magnetic receiver unit, miniature camera, automatic brightness control sensor, and microcontroller. The flight helmet for JHMCS is based on the new lightweight HGU-55A/P. This paper describes the requirements for the helmet qualification tests including: windblast, ejection tower, hanging harness, centrifuge, mass properties, energy attenuation and penetration resistance, noise attenuation, visor characteristics, compatibility demonstration, sled/in- flight ejection, water survival, standard conditions and environment. The test objective, success criteria, equipment configuration, and data collection requirements for each test is discussed.

  17. Examination of a Junction-Box Adhesion Test for Use in Photovoltaic Module Qualification: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, D. C.; Wohlgemuth, J. H.

    2012-08-01

    Engineering robust adhesion of the junction-box (j-box) is a hurdle typically encountered by photovoltaic (PV) module manufacturers during product development. There are historical incidences of adverse effects (e.g., fires) caused when the j-box/adhesive/module system has failed in the field. The addition of a weight to the j-box during the 'damp heat' IEC qualification test is proposed to verify the basic robustness of its adhesion system. The details of the proposed test will be described, in addition to the preliminary results obtained using representative materials and components. The described discovery experiments examine moisture-cured silicone, foam tape, and hot-melt adhesives used inmore » conjunction with PET or glass module 'substrates.' To be able to interpret the results, a set of material-level characterizations was performed, including thermogravimetric analysis, differential scanning calorimetry, and dynamic mechanical analysis. PV j-boxes were adhered to a substrate, loaded with a prescribed weight, and then placed inside an environmental chamber (at 85C, 85% relative humidity). Some systems did not remain attached through the discovery experiments. Observed failure modes include delamination (at the j-box/adhesive or adhesive/substrate interface) and phase change/creep. The results are discussed in the context of the application requirements, in addition to the plan for the formal experiment supporting the proposed modification to the qualification test.« less

  18. Staubli TX-90XL robot qualification at the LLIHE.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Covert, Timothy Todd

    The Light Initiated High Explosive (LIHE) Facility uses a robotic arm to spray explosive material onto test items for impulse tests. In 2007, the decision was made to replace the existing PUMA 760 robot with the Staubli TX-90XL. A qualification plan was developed and implemented to verify the safe operating conditions and failure modes of the new system. The robot satisfied the safety requirements established in the qualification plan. A performance issue described in this report remains unresolved at the time of this publication. The final readiness review concluded the qualification of this robot at the LIHE facility.

  19. Vibration testing of the JE-M-604-4-IUE rocket motor (Thiokol P/N E 28639-03)

    NASA Technical Reports Server (NTRS)

    Alt, R. E.; Tosh, J. T.

    1976-01-01

    The NASA International Ultraviolet Explorer (IUE) rocket motor (TE-M-604-4), a solid fuel, spherical rocket motor, was vibration tested in the Impact, Vibration, and Acceleration (IVA) Test Unit of the von Karman Gas Dynamics Facility (VKF). The objective of the test program was to subject the motor to qualification levels of sinusoidal and random vibration prior to the altitude firing of the motor in the Propulsion Development Test Cell (T-3), Engine Test Facility (ETF), AEDC. The vibration testing consisted of a low level sine survey from 5 to 2,000 Hz, followed by a qualification level sine sweep and qualification level random vibration. A second low level sine survey followed the qualification level testing. This sequence of testing was accomplished in each of three orthogonal axes. No motor problems were observed due to the imposition of these dynamic environments.

  20. ELIMINATION OF THE CHARACTERIZATION OF DWPF POUR STREAM SAMPLE AND THE GLASS FABRICATION AND TESTING OF THE DWPF SLUDGE BATCH QUALIFICATION SAMPLE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Amoroso, J.; Peeler, D.; Edwards, T.

    2012-05-11

    A recommendation to eliminate all characterization of pour stream glass samples and the glass fabrication and Product Consistency Test (PCT) of the sludge batch qualification sample was made by a Six-Sigma team chartered to eliminate non-value-added activities for the Defense Waste Processing Facility (DWPF) sludge batch qualification program and is documented in the report SS-PIP-2006-00030. That recommendation was supported through a technical data review by the Savannah River National Laboratory (SRNL) and is documented in the memorandums SRNL-PSE-2007-00079 and SRNL-PSE-2007-00080. At the time of writing those memorandums, the DWPF was processing sludge-only waste but, has since transitioned to a coupledmore » operation (sludge and salt). The SRNL was recently tasked to perform a similar data review relevant to coupled operations and re-evaluate the previous recommendations. This report evaluates the validity of eliminating the characterization of pour stream glass samples and the glass fabrication and Product Consistency Test (PCT) of the sludge batch qualification samples based on sludge-only and coupled operations. The pour stream sample has confirmed the DWPF's ability to produce an acceptable waste form from Slurry Mix Evaporator (SME) blending and product composition/durability predictions for the previous sixteen years but, ultimately the pour stream analysis has added minimal value to the DWPF's waste qualification strategy. Similarly, the information gained from the glass fabrication and PCT of the sludge batch qualification sample was determined to add minimal value to the waste qualification strategy since that sample is routinely not representative of the waste composition ultimately processed at the DWPF due to blending and salt processing considerations. Moreover, the qualification process has repeatedly confirmed minimal differences in glass behavior from actual radioactive waste to glasses fabricated from simulants or batch chemicals. In

  1. Rover Low Gain Antenna Qualification for Deep Space Thermal Environments

    NASA Technical Reports Server (NTRS)

    Ramesham, Rajeshuni; Amaro, Luis R.; Brown, Paula R.; Usiskin, Robert; Prater, Jack L.

    2013-01-01

    A method to qualify the Rover Low Gain Antenna (RLGA) for use during the Mars Science Laboratory (MSL) mission has been devised. The RLGA antenna must survive all ground operations, plus the nominal 670 Martian sol mission that includes the summer and winter seasons of the Mars thermal environment. This qualification effort was performed to verify that the RLGA design, its bonding, and packaging processes are adequate. The qualification test was designed to demonstrate a survival life of three times more than all expected ground testing, plus a nominal 670 Martian sol missions. Baseline RF tests and a visual inspection were performed on the RLGA hardware before the start of the qualification test. Functional intermittent RF tests were performed during thermal chamber breaks over the course of the complete qualification test. For the return loss measurements, the RLGA antenna was moved to a test area. A vector network analyzer was calibrated over the operational frequency range of the antenna. For the RLGA, a simple return loss measurement was performed. A total of 2,010 (3 670 or 3 times mission thermal cycles) thermal cycles was performed. Visual inspection of the RLGA hardware did not show any anomalies due to the thermal cycling. The return loss measurement results of the RLGA antenna after the PQV (Package Qualification and Verification) test did not show any anomalies. The antenna pattern data taken before and after the PQV test at the uplink and downlink frequencies were unchanged. Therefore, the developed design of RLGA is qualified for a long-duration MSL mission.

  2. Open-Source RTOS Space Qualification: An RTEMS Case Study

    NASA Technical Reports Server (NTRS)

    Zemerick, Scott

    2017-01-01

    NASA space-qualification of reusable off-the-shelf real-time operating systems (RTOSs) remains elusive due to several factors notably (1) The diverse nature of RTOSs utilized across NASA, (2) No single NASA space-qualification criteria, lack of verification and validation (V&V) analysis, or test beds, and (3) different RTOS heritages, specifically open-source RTOSs and closed vendor-provided RTOSs. As a leader in simulation test beds, the NASA IV&V Program is poised to help jump-start and lead the space-qualification effort of the open source Real-Time Executive for Multiprocessor Systems (RTEMS) RTOS. RTEMS, as a case-study, can be utilized as an example of how to qualify all RTOSs, particularly the reusable non-commercial (open-source) ones that are gaining usage and popularity across NASA. Qualification will improve the overall safety and mission assurance of RTOSs for NASA-agency wide usage. NASA's involvement in space-qualification of an open-source RTOS such as RTEMS will drive the RTOS industry toward a more qualified and mature open-source RTOS product.

  3. BSA Delta Qualification 2, volume 3, book 1

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This report, presented in three volumes, provides the results of a two-motor Delta Qualification 2 program conducted in 1993 to certify the following enhancements for incorporation into booster separation motor (BSM) flight hardware: vulcanized-in-place nozzle aft closure insulation; new iso-static ATJ bulk graphite throat insert material; adhesive EA 9394 for bonding the nozzle throat, igniter grain rod/centering insert/igniter case; deletion of the igniter adapter insulator ring; deletion of the igniter adapter/igniter case interface RTV; and deletion of Loctite from igniter retainer plate threads. The enhancements above directly resulted from (1) the BSM total quality management (TQM) team initiatives to enhance the BSM producibility, and (2) the necessity to qualify new throat insert and adhesive systems to replace existing materials that will not be available. Testing was completed at both the component and motor levels. Component testing was accomplished to screen candidate materials (e.g., throat materials, adhesive systems) and to optimize processes (e.g., aft closure insulator vulcanization approach) prior to their incorporation into the test motors. Motor tests -- consisting of two motors, randomly selected by USBI's on-site quality personnel from production lot AAY, which were modified to accept the enhancements -- were completed to provide the final qualification of the enhancements for incorporation into flight hardware. Volume 3 book 1 provides supporting documentation to the analyses and plans of testing the two Delta Qualification units including thermal cycling planning/data acceptance records, environmental test procedures and pretest temperature conditioning history, Delta Qualification test plan, and specification SE0837 -- mix acceptance test specification.

  4. The Viking parachute qualification test technique.

    NASA Technical Reports Server (NTRS)

    Raper, J. L.; Lundstrom, R. R.; Michel, F. C.

    1973-01-01

    The parachute system for NASA's Viking '75 Mars lander was flight qualified in four high-altitude flight tests at the White Sands Missile range (WSMR). A balloon system lifted a full-scale simulated Viking spacecraft to an altitude where a varying number of rocket motors were used to propel the high drag, lifting test vehicle to test conditions which would simulate the range of entry conditions expected at Mars. A ground-commanded cold gas pointing system located on the balloon system provided powered vehicle azimuth control to insure that the flight trajectory remained within the WSMR boundaries. A unique ground-based computer-radar system was employed to monitor inflight performance of the powered vehicle and insure that command ignition of the parachute mortar occurred at the required test conditions of Mach number and dynamic pressure. Performance data were obtained from cameras, telemetry, and radar.

  5. Environmental qualification testing of payload G-534, the Pool Boiling Experiment

    NASA Technical Reports Server (NTRS)

    Sexton, J. Andrew

    1992-01-01

    Payload G-534, the prototype Pool Boiling Experiment (PBE), is scheduled to fly on the STS-47 mission in September 1992. This paper describes the purpose of the experiment and the environmental qualification testing program that was used to prove the integrity of the hardware. Component and box level vibration and thermal cycling tests were performed to give an early level of confidence in the hardware designs. At the system level, vibration, thermal extreme soaks, and thermal vacuum cycling tests were performed to qualify the complete design for the expected shuttle environment. The system level vibration testing included three axis sine sweeps and random inputs. The system level hot and cold soak tests demonstrated the hardware's capability to operate over a wide range of temperatures and gave wider latitude in determining which shuttle thermal attitudes were compatible with the experiment. The system level thermal vacuum cycling tests demonstrated the hardware's capability to operate in a convection free environment. A unique environmental chamber was designed and fabricated by the PBE team and allowed most of the environmental testing to be performed within the hardware build laboratory. The completion of the test program gave the project team high confidence in the hardware's ability to function as designed during flight.

  6. Establishment of an unrelated umbilical cord blood bank qualification program: ensuring quality while meeting Food and Drug Administration vendor qualification requirements.

    PubMed

    Rabe, Fran; Kadidlo, Diane; Van Orsow, Lisa; McKenna, David

    2013-10-01

    Qualification of a cord blood bank (CBB) is a complex process that includes evaluation of multiple aspects of donor screening and testing, processing, accreditation and approval by professional cell therapy groups, and results of received cord blood units. The University of Minnesota Medical Center Cell Therapy Laboratory has established a CBB vendor qualification process to ensure the CBB meets established regulatory and quality requirements. The deployed qualification of CBBs is based on retrospective and prospective review of the CBB. Forty-one CBBs were evaluated retrospectively: seven CBBs were disqualified based on failed quality control (QC) results. Eight CBBs did not meet the criteria for retrospective qualification because fewer than 3 cord blood units were received and the CBB was not accredited. As of March 2012, three US and one non-US CBBs have been qualified prospectively. One CBB withdrew from the qualification process after successful completion of the comprehensive survey and subsequent failure of the provided QC unit to pass the minimum criteria. One CBB failed the prospective qualification process based on processing methods that were revealed during the paper portion of the evaluation. A CBB qualification process is necessary for a transplant center to manage the qualification of the large number of CBBs needed to support a umbilical cord blood transplantation program. A transplant center that has utilized cord blood for a number of years before implementation of a qualification process should use a retrospective qualification process along with a prospective process. © 2013 American Association of Blood Banks.

  7. Technology Implementation Plan: Irradiation Testing and Qualification for Nuclear Thermal Propulsion Fuel

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harrison, Thomas J.; Howard, Richard H.; Rader, Jordan D.

    This document is a notional technology implementation plan (TIP) for the development, testing, and qualification of a prototypic fuel element to support design and construction of a nuclear thermal propulsion (NTP) engine, specifically its pre-flight ground test. This TIP outlines a generic methodology for the progression from non-nuclear out-of-pile (OOP) testing through nuclear in-pile (IP) testing, at operational temperatures, flows, and specific powers, of an NTP fuel element in an existing test reactor. Subsequent post-irradiation examination (PIE) will occur in existing radiological facilities. Further, the methodology is intended to be nonspecific with respect to fuel types and irradiation or examinationmore » facilities. The goals of OOP and IP testing are to provide confidence in the operational performance of fuel system concepts and provide data to program leadership for system optimization and fuel down-selection. The test methodology, parameters, collected data, and analytical results from OOP, IP, and PIE will be documented for reference by the NTP operator and the appropriate regulatory and oversight authorities. Final full-scale integrated testing would be performed separately by the reactor operator as part of the preflight ground test.« less

  8. Qualification test results for blue-red reflecting solar covers

    NASA Technical Reports Server (NTRS)

    Beauchamp, W. T.

    1994-01-01

    Recent market forces and design innovations have spurred the development of solar cell covers that significantly reduce the solar absorptance for a cell array. GaAs cells, using Ge as the substrate host material, can have a significantly higher output if the solar absorptance of the cell array is reduced. New optical coating design techniques have allowed the construction of covers that reflect the ultraviolet energy (below 350 nm) and the near infrared energy (above 900 nm) resulting in the beneficial reduction in absorptance. Recent modeling suggests three or more present output increase due to the lowered temperature with such a device. Within the last several months we have completed the testing of production samples of these new covers in a qualification series that included the usual environmental effects associated with the routine testing of solar cell covers and the combined effects of protons, electrons and solar UV as would be encountered in space. For the combined effects testing the samples were exposed to 300 sun days equivalent UV, 5 x 10(exp 14)/sq cm of 0.5 MeV protons and 10(exp 15)/sq cm of 1.0 MeV electrons. Measurements of the reflectance, transmission, emittance and other appropriate parameters were made before and after the testing. As measured by the averaged transmission over the cell operating band, the change in transmission for the samples was less than or about equal to 1 percent. The details of the testing and the results in terms of transmission, reflectance and emittance are discussed in the paper.

  9. Qualification and calibration tests of detector modules for the CMS Pixel Phase 1 upgrade

    NASA Astrophysics Data System (ADS)

    Zhu, D.; Backhaus, M.; Berger, P.; Meinhard, M.; Starodumov, A.; Tavolaro, V.

    2018-01-01

    In high energy particle physics, accelerator- and detector-upgrades always go hand in hand. The instantaneous luminosity of the Large Hadron Collider will increase to up to L = 2×1034cm-2s-1 during Run 2 until 2023. In order to cope with such luminosities, the pixel detector of the CMS experiment has been replaced early 2017. The so-called CMS Pixel phase 1 upgrade detector consists of 1184 modules with new design. An important production step is the module qualification and calibration, ensuring their proper functionality within the detector. This paper summarizes the qualification and calibration tests and results of modules used in the innermost two detector layers with focus on methods using module-internal calibration signals. Extended characterizations on pixel level such as electronic noise and bump bond connectivity, optimization of operational parameters, sensor quality and thermal stress resistance were performed using a customized setup with controlled environment. It could be shown that the selected modules have on average 0.55‰ ± 0.01‰ defective pixels and that all performance parameters stay within their specifications.

  10. Secondary Waste Cast Stone Waste Form Qualification Testing Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Westsik, Joseph H.; Serne, R. Jeffrey

    2012-09-26

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is being constructed to treat the 56 million gallons of radioactive waste stored in 177 underground tanks at the Hanford Site. The WTP includes a pretreatment facility to separate the wastes into high-level waste (HLW) and low-activity waste (LAW) fractions for vitrification and disposal. The LAW will be converted to glass for final disposal at the Integrated Disposal Facility (IDF). Cast Stone – a cementitious waste form, has been selected for solidification of this secondary waste stream after treatment in the ETF. The secondary-waste Cast Stone waste form must be acceptablemore » for disposal in the IDF. This secondary waste Cast Stone waste form qualification testing plan outlines the testing of the waste form and immobilization process to demonstrate that the Cast Stone waste form can comply with the disposal requirements. Specifications for the secondary-waste Cast Stone waste form have not been established. For this testing plan, Cast Stone specifications are derived from specifications for the immobilized LAW glass in the WTP contract, the waste acceptance criteria for the IDF, and the waste acceptance criteria in the IDF Permit issued by the State of Washington. This testing plan outlines the testing needed to demonstrate that the waste form can comply with these waste form specifications and acceptance criteria. The testing program must also demonstrate that the immobilization process can be controlled to consistently provide an acceptable waste form product. This testing plan also outlines the testing needed to provide the technical basis for understanding the long-term performance of the waste form in the disposal environment. These waste form performance data are needed to support performance assessment analyses of the long-term environmental impact of the secondary-waste Cast Stone waste form in the IDF« less

  11. 25 CFR 225.29 - Corporate qualifications and requests for information.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Corporate qualifications and requests for information. 225.29 Section 225.29 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ENERGY AND MINERALS OIL AND GAS, GEOTHERMAL, AND SOLID MINERALS AGREEMENTS Minerals Agreements § 225.29 Corporate...

  12. 25 CFR 225.29 - Corporate qualifications and requests for information.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Corporate qualifications and requests for information. 225.29 Section 225.29 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ENERGY AND MINERALS OIL AND GAS, GEOTHERMAL, AND SOLID MINERALS AGREEMENTS Minerals Agreements § 225.29 Corporate...

  13. RL10A-3-3B high mixture ratio qualification program

    NASA Technical Reports Server (NTRS)

    Vogel, T.; Varella, D.; Smith, C.

    1987-01-01

    The results of the high mixture ratio qualification testing of the RL10 engine for the Shuttle/Centaur program are presented. The objective of the engine qualification test was to demonstrate the suitability of the RL10A-3-3B engine for space vehicle flight by subjecting it to the testing specified in RL10A-3-3B Model Specification Number 2295 dated February 1986. The applicable section of the specification is presented. Due to payload volume advantages which can be achieved by increasing the operating mixture ratio of the RL10, a decision was made to qualify the engine to run at a higher mixture ratio. A program was created to qualify the RL10 engine for operation at 15,000 pounds thrust and a nominal 6.0 to 1 mixture ratio. This model of the engine was designated the RL10A-3-3B. The qualification program included three test series as follows: (1) hardware durability and limits test in which the engine completed 23 firings and 4605.7 seconds with 1588.7 seconds at less than 6.6 mixture ratio; (2) preliminary qualification test in which the engine completed 26 firings and 5750 seconds; and (3) qualification test in which the engine completed 26 hot firings and 5693.4 seconds with 905.9 seconds at 6.7 mixture ratio. Several changes in engine hardware were required for operation of the RL10A-3-3B engine in the Space Shuttle which include a duel pressure switch ignition, an oxidizer flow control, and helium plumbing changes.

  14. Reliability and Qualification of Hardware to Enhance the Mission Assurance of JPL/NASA Projects

    NASA Technical Reports Server (NTRS)

    Ramesham, Rajeshuni

    2010-01-01

    Packaging Qualification and Verification (PQV) and life testing of advanced electronic packaging, mechanical assemblies (motors/actuators), and interconnect technologies (flip-chip), platinum temperature thermometer attachment processes, and various other types of hardware for Mars Exploration Rover (MER)/Mars Science Laboratory (MSL), and JUNO flight projects was performed to enhance the mission assurance. The qualification of hardware under extreme cold to hot temperatures was performed with reference to various project requirements. The flight like packages, assemblies, test coupons, and subassemblies were selected for the study to survive three times the total number of expected temperature cycles resulting from all environmental and operational exposures occurring over the life of the flight hardware including all relevant manufacturing, ground operations, and mission phases. Qualification/life testing was performed by subjecting flight-like qualification hardware to the environmental temperature extremes and assessing any structural failures, mechanical failures or degradation in electrical performance due to either overstress or thermal cycle fatigue. Experimental flight qualification test results will be described in this presentation.

  15. Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Engineering Test Report: AMSU-A1 METSAT Instrument (S/N 105) Qualification, Level Vibration Tests of December 1998 (S/O 605445, OC-419)

    NASA Technical Reports Server (NTRS)

    Heffner, R. J.

    1998-01-01

    This is the Engineering Test Report, AMSU-AL METSAT Instrument (S/N 105) Qualification Level Vibration Tests of December 1998 (S/0 605445, OC-419), for the Integrated Advanced Microwave Sounding Unit-A (AMSU-A).

  16. Historical flight qualifications of space nuclear systems

    NASA Astrophysics Data System (ADS)

    Bennett, Gary L.

    1997-01-01

    An overview is presented of the qualification programs for the general-purpose heat source radioisotope thermoelectric generators (GPHS-RTGs) as developed for the Galileo and Ulysses missions; the SNAP-10A space reactor; the Nuclear Engine for Rocket Vehicle Applications (NERVA); the F-1 chemical rocket engine used on the Saturn-V Apollo lunar missions; and the Space Shuttle Main Engines (SSMEs). Some similarities and contrasts between the qualification testing employed on these five programs will be noted. One common thread was that in each of these successful programs there was an early focus on component and subsystem tests to uncover and correct problems.

  17. Qualification of silicon pore optics

    NASA Astrophysics Data System (ADS)

    Wille, Eric; Bavdaz, Marcos; Fransen, Sebastiaan; Collon, Maximilien; Ackermann, Marcelo; Guenther, Ramses; Chatbi, Abdelhakim; Vacanti, Giuseppe; Vervest, Mark; van Baren, Coen; Haneveld, Jeroen; Riekerink, Mark Olde; Koelewijn, Arenda; Kampf, Dirk; Zuknik, Karl-Heinz; Reutlinger, Arnd

    2014-07-01

    Silicon Pore Optics (SPO) are the enabling technology for ESA's second large class mission in the Cosmic Vision programme. As for every space hardware, a critical qualification process is required to verify the suitability of the SPO mirror modules surviving the launch loads and maintaining their performance in the space environment. We present recent design modifications to further strengthen the mounting system (brackets and dowel pins) against mechanical loads. The progress of a formal qualification test campaign with the new mirror module design is shown. We discuss mechanical and thermal limitations of the SPO technology and provide recommendations for the mission design of the next X-ray Space Observatory.

  18. Flight qualification of mortar-actuated parachute deployment systems

    NASA Technical Reports Server (NTRS)

    Pleasants, J. E.

    1975-01-01

    A brief discussion outlines background of mortar use in parachute deployment systems. A description of the system operation is presented. Effects of the environment on performance are discussed as well as the instrumentation needed to assess this performance. Power unit qualification and lot qualification for shear pins and cartridges is delineated. Functional mortar system tests are described. Finally, bridle deployment and parachute deployment are discussed.

  19. [Equipment qualification].

    PubMed

    Le Vacon, F

    2005-06-01

    The qualification of the equipment is a particularly important stage in the transfusional process. On the one hand, of many standards such as those of certification or that of accreditation require it, just as the good transfusional practices; in addition, the practices of steps of quality assurance develop this aspect. Indeed, the absence of the realization of this qualification of material having an influence on the finished product, can lead to an error in the product. This qualification passes by various stages of which some are major such as the drafting of the schedule of conditions, the drafting of the operational protocol of qualification, the decision made for the setting in routine. Finally so that this qualification takes all its dimensions it is necessary to carry out methods linked to the international system of measurement. Moreover certain questions after reflexions must find response such as which unit to check, and only this one, the equipment is - it a complex one, is there a maintenance contract? Once all these elements taken into account, the questions having found their answer, the operational protocol will then well be built, the decisions of settings in routine could be done and the sets of the finalized stages.

  20. Australian Qualifications Framework Lower-Level Qualifications: Pathways to Where for Young People?

    ERIC Educational Resources Information Center

    Stanwick, John

    2005-01-01

    This study investigates where certificate I and II qualifications lead young people aged 15-24 years in terms of employment and further study. A prime motivation for young people undertaking these qualifications is to facilitate transition into the labour market. These qualifications are aimed at developing basic vocational skills or preparatory…

  1. [The role of the basophil activation test (BAT) in qualification for specific immunotherapy with inhalant allergens].

    PubMed

    Bulanda, Małgorzata; Dyga, Wojciech; Rusinek, Barbara; Czarnobilska, Ewa

    Qualification for specific immunotherapy (SIT) according to the guidelines of the European Academy of Allergy and Clinical Immunology (EAACI) includes medical history, skin prik tests (SPT) and/or measuring the concentration of sIgE. It is necessary to perform additional diagnostic tests in case of discrepancies between the history and the results of SPT/sIgE or differences between SPT and sIgE. Basophil activation test (BAT) assesses the expression of activation markers of these cells, eg. CD63 and CD203c after stimulation. The aim of our study was to evaluate the usefulness of BAT in the qualification for the SIT in comparison to the SPT and sIgE and in case of discrepancies between the results of SPT and sIgE. The study included 30 patients with allergic rhinitis (AR) caused by allergy to house dust mite (Dermatophagoides pteronyssinus, Dp) or birch pollen qualified for SIT. All patients had SPT, sIgE and BAT determination. The group of patients with allergy to birch was a control group for Dp allergic and vice versa. BAT with CD63 antigen expression was performed using a Flow2CAST test. Basophils were stimulated with allergen preparation (50, 500, and 5000 SBU/ml concentrations). BAT results were expressed as a stimulation index (SI). For optimal concentrations of 50 and 500 SBU/ml parameters comparing BAT to SPT and sIgE as the gold standards were consecutively: sensitivity 82-100% and 93-100%, specificity 50-94% and 47-89%, positive predictive value 65- 94% and 61-87%, negative predictive value 86-100% and 93-100%. Correlation BAT - SPT and BAT - sIgE ranged within 0.59 to 0.84 and 0.51 to 0.72. BAT was helpful in 2 of 30 patients with incompatible results of SPT and sIgE. Optimal concentrations for basophil stimulation are 50 and 500 SBU/ ml. BAT may be useful diagnostic tool in the qualification for the SIT in case of discrepancies between the results of SPT and sIgE.

  2. Test 6, Test 7, and Gas Standard Analysis Results

    NASA Technical Reports Server (NTRS)

    Perez, Horacio, III

    2007-01-01

    This viewgraph presentation shows results of analyses on odor, toxic off gassing and gas standards. The topics include: 1) Statistical Analysis Definitions; 2) Odor Analysis Results NASA Standard 6001 Test 6; 3) Toxic Off gassing Analysis Results NASA Standard 6001 Test 7; and 4) Gas Standard Results NASA Standard 6001 Test 7;

  3. Development of a qualification standard for adhesives used in hybrid microcircuits

    NASA Technical Reports Server (NTRS)

    Licari, J. J.; Weigand, B. L.; Soykin, C. A.

    1981-01-01

    Improved qualification standards and test procedures for adhesives used in microelectronic packaging are developed. The test methods in specification for the Selection and Use of Organic Adhesives in Hybrid Microcircuits are reevaluated versus industry and government requirements. Four electrically insulative and four electrically conductive adhesives used in the assembly of hybrid microcircuits are selected to evaluate the proposed revised test methods. An estimate of the cost to perform qualification testing of an adhesive to the requirements of the revised specification is also prepared.

  4. AMS-02 Cryocooler Baseline Configuration and Engineering Model Qualification Test Results

    NASA Technical Reports Server (NTRS)

    Banks, Stuart; Breon, Susan; Shirey, Kimberly

    2003-01-01

    Four Sunpower M87N Stirling-cycle cryocoolers will be used to extend the lifetime of the Alpha Magnetic Spectrometer-02 (AMS-02) experiment. The cryocoolers will be mounted to the AMS-02 vacuum case using a structure that will thermally and mechanically decouple the cryocooler from the vacuum case while providing compliance to allow force attenuation using a passive balancer system. The cryocooler drive is implemented using a 60Hz pulse duration modulated square wave. Details of the testing program, mounting assembly and drive scheme will be presented. AMS-02 is a state-of-the-art particle physics detector containing a large superfluid helium-cooled superconducting magnet. Highly sensitive detector plates inside the magnet measure a particle s speed, momentum, charge, and path. The AMS-02 experiment, which will be flown as an attached payload on the International Space Station, will study the properties and origin of cosmic particles and nuclei including antimatter and dark matter. Two engineering model cryocoolers have been under test at NASA Goddard since November 2001. Qualification testing of the engineering model cryocooler bracket assembly is near completion. Delivery of the flight cryocoolers to Goddard is scheduled for September 2003.

  5. Overview of Materials Qualification Needs for Metal Additive Manufacturing

    NASA Astrophysics Data System (ADS)

    Seifi, Mohsen; Salem, Ayman; Beuth, Jack; Harrysson, Ola; Lewandowski, John J.

    2016-03-01

    This overview highlights some of the key aspects regarding materials qualification needs across the additive manufacturing (AM) spectrum. AM technology has experienced considerable publicity and growth in the past few years with many successful insertions for non-mission-critical applications. However, to meet the full potential that AM has to offer, especially for flight-critical components (e.g., rotating parts, fracture-critical parts, etc.), qualification and certification efforts are necessary. While development of qualification standards will address some of these needs, this overview outlines some of the other key areas that will need to be considered in the qualification path, including various process-, microstructure-, and fracture-modeling activities in addition to integrating these with lifing activities targeting specific components. Ongoing work in the Advanced Manufacturing and Mechanical Reliability Center at Case Western Reserve University is focusing on fracture and fatigue testing to rapidly assess critical mechanical properties of some titanium alloys before and after post-processing, in addition to conducting nondestructive testing/evaluation using micro-computerized tomography at General Electric. Process mapping studies are being conducted at Carnegie Mellon University while large area microstructure characterization and informatics (EBSD and BSE) analyses are being conducted at Materials Resources LLC to enable future integration of these efforts via an Integrated Computational Materials Engineering approach to AM. Possible future pathways for materials qualification are provided.

  6. Historical flight qualifications of space nuclear systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bennett, G.L.

    1997-01-01

    An overview is presented of the qualification programs for the general-purpose heat source radioisotope thermoelectric generators (GPHS-RTGs) as developed for the Galileo and Ulysses missions; the SNAP-10A space reactor; the Nuclear Engine for Rocket Vehicle Applications (NERVA); the F-1 chemical rocket engine used on the Saturn-V Apollo lunar missions; and the Space Shuttle Main Engines (SSMEs). Some similarities and contrasts between the qualification testing employed on these five programs will be noted. One common thread was that in each of these successful programs there was an early focus on component and subsystem tests to uncover and correct problems. {copyright} {italmore » 1997 American Institute of Physics.}« less

  7. 30 CFR 250.1921 - What qualifications must the ASP meet?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false What qualifications must the ASP meet? 250.1921 Section 250.1921 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Safety and Environmental Management Systems (SEMS) § 250.1921...

  8. 30 CFR 250.1921 - What qualifications must the ASP meet?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false What qualifications must the ASP meet? 250.1921 Section 250.1921 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Safety and Environmental Management Systems (SEMS) § 250.1921...

  9. Qualification of UHF Antenna for Extreme Martian Thermal Environments

    NASA Technical Reports Server (NTRS)

    Ramesham, Rajeshuni; Amaro, Luis R.; Brown, Paula R.; Usiskin, Robert

    2013-01-01

    The purpose of this development was to validate the use of the external Rover Ultra High Frequency (RUHF) antenna for space under extreme thermal environments to be encountered during the surface operations of the Mars Science Laboratory (MSL) mission. The antenna must survive all ground operations plus the nominal 670 Martian sol mission that includes summer and winter seasons of the Mars thermal environment.The qualification effort was to verify that the RUHF antenna design and its bonding and packaging processes are adequate to survive the harsh environmental conditions. The RUHF is a quadrifilar helix antenna mounted on the MSL Curiosity rover deck. The main components of the RUHF antenna are the helix structure, feed cables, and hybrid coupler, and the high-power termination load. In the case of MSL rover externally mounted hardware, not only are the expected thermal cycle depths severe, but there are temperature offsets between the Mars summer and winter seasons. The total number of temperature cycles needed to be split into two regimes of summer cycles and winter cycles. The qualification test was designed to demonstrate a survival life of three times more than all expected ground testing, plus a nominal 670 Martian sol missions. Baseline RF tests and a visual inspection were performed prior to the start of the qualification test. Functional RF tests were performed intermittently during chamber breaks over the course of the qualification test. For the RF return loss measurements, the antenna was tested in a controlled environment outside the thermal chamber with a vector network analyzer that was calibrated over the antenna s operational frequency range. A total of 2,010 thermal cycles were performed. Visual inspection showed a dulling of the solder material. This change will not affect the performance of the antenna. No other changes were observed. RF tests were performed on the RUHF helix antenna, hybrid, and load after the 2,010 qualification cycles test

  10. Qualification testing of solar photovoltaic powered refrigerator freezers for medical use in remote geographic locations

    NASA Astrophysics Data System (ADS)

    Kaszeta, W. J.

    1982-12-01

    One of the primary obstacles to the application of vaccination in developing countries is the lack of refrigerated storage. Vaccines exposed to elevated temperatures suffer a permanent loss of potency. Photovoltaic (PV) powered refrigerator/freezer (R/F) units could surmount the problem of refrigeration in remote areas where no reliable commercial power supply is available. The performance measurements of two different models of PV powered R/F units for medical use are presented. Qualification testing consisted of four major procedures: no-load pull down, ice making, steady-state (maintenance), and holdover. Both R/F units met the major World Health Organization (WHO) requirements. However, the testing performed does not provide complete characterization of the two units; such information could be derived only from further extensive test procedures.

  11. Qualification testing of solar photovoltaic powered refrigerator freezers for medical use in remote geographic locations

    NASA Technical Reports Server (NTRS)

    Kaszeta, W. J.

    1982-01-01

    One of the primary obstacles to the application of vaccination in developing countries is the lack of refrigerated storage. Vaccines exposed to elevated temperatures suffer a permanent loss of potency. Photovoltaic (PV) powered refrigerator/freezer (R/F) units could surmount the problem of refrigeration in remote areas where no reliable commercial power supply is available. The performance measurements of two different models of PV powered R/F units for medical use are presented. Qualification testing consisted of four major procedures: no-load pull down, ice making, steady-state (maintenance), and holdover. Both R/F units met the major World Health Organization (WHO) requirements. However, the testing performed does not provide complete characterization of the two units; such information could be derived only from further extensive test procedures.

  12. Qualifications for Tenure: The Legal Definitions. ASHE Annual Meeting Paper.

    ERIC Educational Resources Information Center

    Lee, Barbara A.

    The issue of qualifications for tenure is examined with attention to judicial tests for qualification in lawsuits in which faculty alleged that negative tenure decisions were infected with illegal discrimination. The focus is the degree to which a faculty plaintiff must demonstrate at the first stage of the lawsuit that he or she was qualified for…

  13. Kiel sensors for the EPD instrument on-board Solar Orbiter - An overview of the qualification and acceptance test campaigns in phase D

    NASA Astrophysics Data System (ADS)

    Ravanbakhsh, A.; Kulkarni, S. R.; Panitzsch, L.; L Richards, M.; Munoz Hernandez, A.; Seimetz, L.; Elftmann, R.; Mahesh, Y.; Boden, S.; Boettcher, S. I.; Kulemzin, A.; Martin-Garcia, C.; Prieto, M.; Rodriguez-Pacheco, J.; Sanchez Prieto, S.; Schuster, B.; Steinhagen, J.; Tammen, J.; Wimmer-Schweingruber, R. F.

    2016-12-01

    Solar Orbiter is ESA's next solar and heliospheric mission which is planned to be launched in October 2018. The Energetic Particle Detector (EPD) on board on Solar Orbiter will provide key measurements for the Solar Orbiter science objectives. The EPD suite consists of four sensors; STEP, SIS, EPT and HET. The University of Kiel in Germany is responsible for the design, development, and building of STEP, and the two identical units EPT-HET 1 and EPT-HET 2. ESA's Solar Orbiter will explore the heliosphere at heliocentric distances between 0.28AU and 0.9AU and with inclination up to 38deg with respect to the Sun's equator. The spacecraft uses a heat shield to protect the bus and externally mounted instruments from the solar flux at the close distances to the sun. All three EPD-Kiel units are mounted externally but in different positions on the spacecraft outer deck. Although being protected by the spacecraft heat shield from high solar flux, EPT-HET1 and EPT-HET-2 as well as STEP experience a harsh environmental condition during the course of the mission. In addition due to the highly demanding science requirements, the qualification and acceptance test requirements of these externally mounted units are quite challenging. In this paper we present the development status of the EPT-HET 1, EPT-HET 2 and STEP sensors focusing on the activities performed in phase D and the qualification and acceptance test campaigns. The main objective of these test campaigns is to ensure and demonstrate the compatibility between the scientific requirements and the harsh environment expected during the mission. This paper includes the results summary of the environmental tests on the EPT-HET and STEP Proto-Qualification Models (PQMs) as well as Proto-Flight Models (PFMs). Only an adequate selection of environmental qualification and acceptance campaigns will guarantee the success of the scientific space missions.

  14. Dynamic Environmental Qualification Techniques.

    DTIC Science & Technology

    1981-12-01

    environments peculiar to military operations and requirements. numerous dynamic qualification test methods have been established. It was the purpose...requires the achievement of the highest practicable degree in the standard- ization of items, materials and engineering practices within the...standard is described as "A document that established engineering and technical requirements for processes, pro’cedures, practices and methods that have

  15. EUCLID/NISP GRISM qualification model AIT/AIV campaign: optical, mechanical, thermal and vibration tests

    NASA Astrophysics Data System (ADS)

    Caillat, A.; Costille, A.; Pascal, S.; Rossin, C.; Vives, S.; Foulon, B.; Sanchez, P.

    2017-09-01

    Dark matter and dark energy mysteries will be explored by the Euclid ESA M-class space mission which will be launched in 2020. Millions of galaxies will be surveyed through visible imagery and NIR imagery and spectroscopy in order to map in three dimensions the Universe at different evolution stages over the past 10 billion years. The massive NIR spectroscopic survey will be done efficiently by the NISP instrument thanks to the use of grisms (for "Grating pRISMs") developed under the responsibility of the LAM. In this paper, we present the verification philosophy applied to test and validate each grism before the delivery to the project. The test sequence covers a large set of verifications: optical tests to validate efficiency and WFE of the component, mechanical tests to validate the robustness to vibration, thermal tests to validate its behavior in cryogenic environment and a complete metrology of the assembled component. We show the test results obtained on the first grism Engineering and Qualification Model (EQM) which will be delivered to the NISP project in fall 2016.

  16. Environmental Qualification of a Single-Crystal Silicon Mirror for Spaceflight Use

    NASA Technical Reports Server (NTRS)

    Hagopian, John; Chambers, John; Rohrback. Scott; Bly, Vincent; Morell, Armando; Budinoff, Jason

    2013-01-01

    This innovation is the environmental qualification of a single-crystal silicon mirror for spaceflight use. The single-crystal silicon mirror technology is a previous innovation, but until now, a mirror of this type has not been qualified for spaceflight use. The qualification steps included mounting, gravity change measurements, vibration testing, vibration- induced change measurements, thermal cycling, and testing at the cold operational temperature of 225 K. Typical mirrors used for cold applications for spaceflight instruments include aluminum, beryllium, glasses, and glass-like ceramics. These materials show less than ideal behavior after cooldown. Single-crystal silicon has been demonstrated to have the smallest change due to temperature change, but has not been spaceflight-qualified for use. The advantage of using a silicon substrate is with temperature stability, since it is formed from a stress-free single crystal. This has been shown in previous testing. Mounting and environmental qualification have not been shown until this testing.

  17. The Effect of Armed Forces Qualification Test Score on Mental Health Outcome Following Mild Traumatic Brain Injury

    DTIC Science & Technology

    2012-04-04

    Brain reserve and dementia: a systematic review . Psychol Med 2006;36:441–54. 39. Valenzuela MJ: Brain reserve and the prevention of dementia. Curr Opin...Forces Qualification Test (AFQT) score. A retrospective review was conducted to identify those with postinjury mental health disorders (ICD-9-CM codes...studies suggest the relationship between intelligence and mental health outcome may be more robust in those with MTBI, because the injury itself may

  18. Commercial Parts Technology Qualification Processes

    NASA Technical Reports Server (NTRS)

    Cooper, Mark S.

    2013-01-01

    Many high-reliability systems, including space systems, use selected commercial parts (including Plastic Encapsulated Microelectronics or PEMs) for unique functionality, small size, low weight, high mechanical shock resistance, and other factors. Predominantly this usage is subjected to certain 100% tests (typically called screens) and certain destructive tests usually (but not always) performed on the flight lot (typically called qualification tests). Frequently used approaches include those documented in EEE-INST-002 and JPL DocID62212 (which are sometimes modified by the particular aerospace space systems manufacturer). In this study, approaches from these documents and several space systems manufacturers are compared to approaches from a launch systems manufacturer (SpaceX), an implantable medical electronics manufacturer (Medtronics), and a high-reliability transport system process (automotive systems). In the conclusions section, these processes are outlined for all of these cases and presented in tabular form. Then some simple comparisons are made. In this introduction section, the PEM technology qualification process is described, as documented in EEE-INST-002 (written by the Goddard Space Flight Center, GSFC), as well as the somewhat modified approach employed at the Jet Propulsion Laboratory (JPL). Approaches used at several major NASA contractors are also described

  19. Shipboard Tests of Halon 1301 Test Gas Simulants

    DTIC Science & Technology

    1990-08-22

    Halon 1301 Test Gas Simulants," Memo Report, Naval Research Laboratory, Washington, DC, 1989. 8. Air Products and Chemicals , Inc ., "SF6 , An... Products and Chemicals , Inc ., "Specialty Gas Material Safety Data Sheet, Sulfur Hexafluoride " Air Products and Chemicals, Specialty Gas Department...34 Washington, DC, 1978. 11. N.I. Sax, Dangerous Properties of Industrial Materials, Sixth Edition, Van Nostrand Reinhold Company, New York, NY, 1984. 12. Air

  20. Qualification Testing of Engineering Camera and Platinum Resistance Thermometer (PRT) Sensors for Mars Science Laboratory (MSL) Project under Extreme Temperatures to Assess Reliability and to Enhance Mission Assurance

    NASA Technical Reports Server (NTRS)

    Ramesham, Rajeshuni; Maki, Justin N.; Cucullu, Gordon C.

    2008-01-01

    Package Qualification and Verification (PQV) of advanced electronic packaging and interconnect technologies and various other types of qualification hardware for the Mars Exploration Rover/Mars Science Laboratory flight projects has been performed to enhance the mission assurance. The qualification of hardware (Engineering Camera and Platinum Resistance Thermometer, PRT) under extreme cold temperatures has been performed with reference to various project requirements. The flight-like packages, sensors, and subassemblies have been selected for the study to survive three times (3x) the total number of expected temperature cycles resulting from all environmental and operational exposures occurring over the life of the flight hardware including all relevant manufacturing, ground operations and mission phases. Qualification has been performed by subjecting above flight-like qual hardware to the environmental temperature extremes and assessing any structural failures or degradation in electrical performance due to either overstress or thermal cycle fatigue. Experiments of flight like hardware qualification test results have been described in this paper.

  1. AF Ni-Cd cell qualification program

    NASA Technical Reports Server (NTRS)

    Hall, Steve; Brown, Harry; Collins, G.; Hwang, Warren

    1994-01-01

    The present status of the USAF NiCd cell qualification program, which is underway at the Naval Surface Warfare Center-Crane Division, is summarized. The following topics are discussed: overview; background; purpose; stress tests; results for super Ni-Cd; results for SAFT cells; GPS stress test; GPS simulated orbit; and results for gates cells. The discussion is presented in viewgraph format.

  2. 42 CFR 61.34 - Qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Qualifications. 61.34 Section 61.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Service Fellowships § 61.34 Qualifications. Scholastic and other qualifications shall be...

  3. 42 CFR 61.34 - Qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Qualifications. 61.34 Section 61.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Service Fellowships § 61.34 Qualifications. Scholastic and other qualifications shall be...

  4. 42 CFR 61.34 - Qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Qualifications. 61.34 Section 61.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Service Fellowships § 61.34 Qualifications. Scholastic and other qualifications shall be...

  5. 42 CFR 61.34 - Qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Qualifications. 61.34 Section 61.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Service Fellowships § 61.34 Qualifications. Scholastic and other qualifications shall be...

  6. 42 CFR 61.34 - Qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Qualifications. 61.34 Section 61.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Service Fellowships § 61.34 Qualifications. Scholastic and other qualifications shall be...

  7. Fatigue qualification of high thickness composite rotor components

    NASA Astrophysics Data System (ADS)

    Raggi, M.; Mariani, U.; Zaffaroni, G.

    Fatigue qualification aspects of composite rotor components are presented according with the safe life procedure usually applied by helicopter manufacturers. Test activities are identified at three levels of specimen complexity: coupon, structural element and full scale component. Particular attention is given to high thickness laminates qualification as far as environmental exposure is concerned. A practical approach for an accelerated conditioning procedure is described. The application to a main rotor tension link is presented showing the negligible effect of the moisture absorption on its fatigue strength.

  8. 42 CFR 493.1455 - Standard; Clinical consultant qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Standard; Clinical consultant qualifications. 493.1455 Section 493.1455 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND... Testing Laboratories Performing High Complexity Testing § 493.1455 Standard; Clinical consultant...

  9. 42 CFR 493.1417 - Standard; Clinical consultant qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Standard; Clinical consultant qualifications. 493.1417 Section 493.1417 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND... Testing Laboratories Performing Moderate Complexity Testing § 493.1417 Standard; Clinical consultant...

  10. 42 CFR 493.1443 - Standard; Laboratory director qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Standard; Laboratory director qualifications. 493.1443 Section 493.1443 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND... Testing Laboratories Performing High Complexity Testing § 493.1443 Standard; Laboratory director...

  11. 42 CFR 493.1443 - Standard; Laboratory director qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Standard; Laboratory director qualifications. 493.1443 Section 493.1443 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND... Testing Laboratories Performing High Complexity Testing § 493.1443 Standard; Laboratory director...

  12. High density fuel qualification for a gas turbine engine

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Macleod, J.D.; Orbanski, B.; Hastings, P.R.

    1992-01-01

    A program for the evaluation of gas turbine engine performance, carried out in the Engine Laboratory of the National Research Council of Canada, is described. Problems under consideration include performance alteration between JP-4 fuel and a high energy density fuel, called strategic military fuel (SMF); performance deterioration during the accelerated endurance test; and emission analysis. The T56 fuel control system is found to be capable of operation on the higher energy density fuel with no detrimental effects regarding control of the engine's normal operating regime. The deterioration of the engine performance during 150-hour endurance tests on SMF was very high,more » which was caused by an increase in turbine nozzle effective flow area and turbine blade untwist. The most significant performance losses during the endurance tests were on corrected output power, fuel flow, specific fuel consumption and compressor and turbine presure ratio. 9 refs.« less

  13. Space Shuttle Crawler Transporter Truck Shoe Qualification Tests and Analyses for Return-to-Flight

    NASA Technical Reports Server (NTRS)

    Margasahayam, Ravi N.; Meyer, Karl A.; Burton, Roy C.; Gosselin, Armand M.

    2005-01-01

    A vital element to Launch Complex 39 (LC39) and NASA's Kennedy Space Center (KSC) mobile launch transfer operation is a 3 million kilogram behemoth known as the Crawler Transporter (CT). Built in the 1960's, two CT's have accumulated over 1700+ miles each and have been used for the Apollo and the Space Shuttle programs. Recent observation of fatigue cracks on the CT shoes led to a comprehensive engineering, structural and metallurgical evaluation to assess the root cause that necessitated procurement of over 1000 new shoes. This paper documents the completed dynamic and compression tests on the old and new shoes respectively, so as to certify them for Space Shuttle's return-to-flight (RTF). Measured strain data from the rollout tests was used to develop stress/loading spectra and static equivalent load for qualification testing of the new shoes. Additionally, finite element analysis (FEA) was used to conduct sensitivity analyses of various contact parameters and structural characteristics for acceptance of new shoes.

  14. JOB BRIEFS, SELECTED FEDERAL JOBS--DUTIES, QUALIFICATION REQUIREMENTS, SAMPLE TEST QUESTIONS.

    ERIC Educational Resources Information Center

    Civil Service Commission, Washington, DC.

    INFORMATION ABOUT JOBS IN THE FEDERAL GOVERNMENT FOR PERSONS WITH LIMITED WORK EXPERIENCE OR EDUCATION IS PROVIDED. JOB BRIEFS DESCRIBING THE WORK, OPPORTUNITIES, NUMBER EMPLOYED, EMPLOYING AGENCIES, AND QUALIFICATIONS ARE GIVEN FOR (1) 19 WHITE COLLAR AND POST OFFICE JOBS SUCH AS CLERK-TYPIST, CLERK-STENOGRAPHER, NURSING ASSISTANT, SOIL…

  15. Building world-class microlithographic lens systems: optical material requirements and qualification methods

    NASA Astrophysics Data System (ADS)

    DeStefano, Paul R.; Michaloski, Paul F.

    1993-12-01

    Building successive generations of state-of-the-art wide field, sub-micron microlithographic lens systems dictates ever-tightening material tolerances that challenge glass manufacturers. This paper discusses the optical material needs for microlithographic lens systems and Tropel's in-house material qualification program. Material qualification is divided into three successive stages: (1) fluorescence testing to qualitatively analyze color center characteristics of the material; (2) homogeneity testing to determine the relative volumetric variations in index; and (3) absolute index testing at multiple wavelengths to determine the material's dispersion characteristics.

  16. Gluing interface qualification test results and gluing process development of the EUCLID near-infrared spectro-photometer optical assembly

    NASA Astrophysics Data System (ADS)

    Mottaghibonab, A.; Thiele, H.; Gubbini, E.; Dubowy, M.; Gal, C.; Mecsaci, A.; Gawlik, K.; Vongehr, M.; Grupp, F.; Penka, D.; Wimmer, C.; Bender, R.

    2016-07-01

    The Near Infrared Spectro-Photometer Optical assembly (NIOA) of EUCLID satellite requires high precision large lens holders with different lens materials, shapes and diameters. The aspherical lenses are glued into their separate CTE matched lens holder. The gluing of the lenses in their holder with 2K epoxy is selected as bonding process to minimize the stress in the lenses to achieve the required surface form error (SFE) performance (32nm) and lens position stability (+/-10μm) due to glue shrinkage. Adhesive shrinkage stress occurs during the glue curing at room temperature and operation in cryogenic temperatures, which might overstress the lens, cause performance loss, lens breakage or failure of the gluing interface. The selection of the suitable glue and required bonding parameters, design and qualification of the gluing interface, development and verification of the gluing process was a great challenge because of the low TRL and heritage of the bonding technology. The different material combinations (CaF2 to SS316L, LF5G15 and S-FTM16 to Titanium, SUPRASIL3001 to Invar M93), large diameter (168mm) and thin edge of the lenses, cryogenic nonoperational temperature (100K) and high performance accuracy of the lenses were the main design driver of the development. The different coefficients of thermal expansion (CTE) between lens and lens holder produce large local mechanical stress. As hygroscopic crystal calcium fluoride (CaF2) is very sensitive to moisture therefore an additional surface treatment of the gluing area is necessary. Extensive tests e.g glue handling and single lap shear tests are performed to select the suitable adhesive. Interface connection tests are performed to verify the feasibility of selected design (double pad design), injection channel, the roughness and treatment of the metal and lens interfaces, glue thickness, glue pad diameter and the gluing process. CTE and dynamic measurements of the glue, thermal cycling, damp- heat, connection

  17. Qualification testing of secondary sterilizable silver-zinc cells for use in the Jupiter atmospheric entry probe

    NASA Technical Reports Server (NTRS)

    Manzo, M. A.

    1981-01-01

    A series of qualification tests were run on the secondary, sterilizable silver oxide - zinc cell developed at the NASA Lewis Research Center to determine if the cell was capable of providing mission power requirements for the Jupiter atmospheric entry probe. The cells were tested for their ability to survive radiation at the levels predicted for the Jovian atmosphere with no loss of performance. Cell performance was evaluated under various temperature and loading conditions, and the cells were tested under various environmental conditions related to launch and to deceleration into the Jovian atmosphere. The cell performed acceptably except under the required loading at low temperatures. The cell was redesigned to improve low-temperature performance and energy density. The modified cells improved performance at all temperatures. Results of testing cells of both the original and modified designs are discussed.

  18. 49 CFR Appendix C to Part 192 - Qualification of Welders for Low Stress Level Pipe

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Qualification of Welders for Low Stress Level Pipe C Appendix C to Part 192 Transportation Other Regulations Relating to Transportation (Continued.... C Appendix C to Part 192—Qualification of Welders for Low Stress Level Pipe I. Basic test. The test...

  19. 49 CFR Appendix C to Part 192 - Qualification of Welders for Low Stress Level Pipe

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Qualification of Welders for Low Stress Level Pipe C Appendix C to Part 192 Transportation Other Regulations Relating to Transportation (Continued.... C Appendix C to Part 192—Qualification of Welders for Low Stress Level Pipe I. Basic test. The test...

  20. 49 CFR Appendix C to Part 192 - Qualification of Welders for Low Stress Level Pipe

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Qualification of Welders for Low Stress Level Pipe C Appendix C to Part 192 Transportation Other Regulations Relating to Transportation (Continued.... C Appendix C to Part 192—Qualification of Welders for Low Stress Level Pipe I. Basic test. The test...

  1. 49 CFR Appendix C to Part 192 - Qualification of Welders for Low Stress Level Pipe

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Qualification of Welders for Low Stress Level Pipe C Appendix C to Part 192 Transportation Other Regulations Relating to Transportation (Continued.... C Appendix C to Part 192—Qualification of Welders for Low Stress Level Pipe I. Basic test. The test...

  2. 49 CFR Appendix C to Part 192 - Qualification of Welders for Low Stress Level Pipe

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Qualification of Welders for Low Stress Level Pipe C Appendix C to Part 192 Transportation Other Regulations Relating to Transportation (Continued.... C Appendix C to Part 192—Qualification of Welders for Low Stress Level Pipe I. Basic test. The test...

  3. PIE on Safety-Tested AGR-1 Compact 5-1-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunn, John D.; Morris, Robert Noel; Baldwin, Charles A.

    Post-irradiation examination (PIE) is being performed in support of tristructural isotropic (TRISO) coated particle fuel development and qualification for High-Temperature Gas-cooled Reactors (HTGRs). AGR-1 was the first in a series of TRISO fuel irradiation experiments initiated in 2006 under the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program; this work continues to be funded by the Department of Energy's Office of Nuclear Energy as part of the Advanced Reactor Technologies (ART) initiative. AGR-1 fuel compacts were fabricated at Oak Ridge National Laboratory (ORNL) in 2006 and irradiated for three years in the Idaho National Laboratory (INL) Advanced Test Reactormore » (ATR) to demonstrate and evaluate fuel performance under HTGR irradiation conditions. PIE is being performed at INL and ORNL to study how the fuel behaved during irradiation, and to examine fuel performance during exposure to elevated temperatures at or above temperatures that could occur during a depressurized conduction cooldown event. This report summarizes safety testing of irradiated AGR-1 Compact 5-1-1 in the ORNL Core Conduction Cooldown Test Facility (CCCTF) and post-safety testing PIE.« less

  4. 42 CFR 493.1469 - Standard: Cytology general supervisor qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Standard: Cytology general supervisor... Nonwaived Testing Laboratories Performing High Complexity Testing § 493.1469 Standard: Cytology general supervisor qualifications. The cytology general supervisor must be qualified to supervise cytology services...

  5. 42 CFR 493.1469 - Standard: Cytology general supervisor qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Standard: Cytology general supervisor... Nonwaived Testing Laboratories Performing High Complexity Testing § 493.1469 Standard: Cytology general supervisor qualifications. The cytology general supervisor must be qualified to supervise cytology services...

  6. 42 CFR 493.1469 - Standard: Cytology general supervisor qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 5 2014-10-01 2014-10-01 false Standard: Cytology general supervisor... Nonwaived Testing Laboratories Performing High Complexity Testing § 493.1469 Standard: Cytology general supervisor qualifications. The cytology general supervisor must be qualified to supervise cytology services...

  7. 42 CFR 493.1469 - Standard: Cytology general supervisor qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 5 2012-10-01 2012-10-01 false Standard: Cytology general supervisor... Nonwaived Testing Laboratories Performing High Complexity Testing § 493.1469 Standard: Cytology general supervisor qualifications. The cytology general supervisor must be qualified to supervise cytology services...

  8. 42 CFR 493.1469 - Standard: Cytology general supervisor qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 5 2013-10-01 2013-10-01 false Standard: Cytology general supervisor... Nonwaived Testing Laboratories Performing High Complexity Testing § 493.1469 Standard: Cytology general supervisor qualifications. The cytology general supervisor must be qualified to supervise cytology services...

  9. 46 CFR 197.450 - Breathing gas tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Breathing gas tests. 197.450 Section 197.450 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE OCCUPATIONAL SAFETY AND HEALTH STANDARDS GENERAL PROVISIONS Commercial Diving Operations Periodic Tests and Inspections of Diving Equipment § 197.450 Breathing gas tests. The diving...

  10. 5 CFR 302.403 - Qualifications for promotion.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Qualifications for promotion. 302.403... EMPLOYMENT IN THE EXCEPTED SERVICE Selection and Appointment; Reappointment; and Qualifications for Promotion § 302.403 Qualifications for promotion. In determining qualifications for promotion with respect to an...

  11. Gas Sensor Test Chip

    NASA Technical Reports Server (NTRS)

    Buehler, M.; Ryan, M.

    1995-01-01

    A new test chip is being developed to characterize conducting polymers used in gas sensors. The chip, a seven-layer cofired alumina substrate with gold electrodes, contains 11 comb and U- bend test structures. These structures are designed to measure the sheet resistance, conduction anisotropy, and peripheral conduction of spin-coated films that are not subsequently patterned.

  12. PIE on Safety-Tested Loose Particles from Irradiated Compact 4-4-2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunn, John D.; Gerczak, Tyler J.; Morris, Robert Noel

    2016-04-01

    Post-irradiation examination (PIE) is being performed in support of tristructural isotropic (TRISO) coated particle fuel development and qualification for High Temperature Gas-cooled Reactors (HTGRs). This work is sponsored by the Department of Energy Office of Nuclear Energy (DOE-NE) through the Advanced Reactor Technologies (ART) Office under the Advanced Gas Reactor Fuel Development and Qualification (AGR) Program. The AGR-1 experiment was the first in a series of TRISO fuel irradiation tests initiated in 2006. The AGR-1 TRISO particles and fuel compacts were fabricated at Oak Ridge National Laboratory (ORNL) in 2006 using laboratory-scale equipment and irradiated for 3 years in themore » Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) to demonstrate and evaluate fuel performance under HTGR irradiation conditions. Post-irradiation examination was performed at INL and ORNL to study how the fuel behaved during irradiation, and to test fuel performance during exposure to elevated temperatures at or above temperatures that could occur during a depressurized conduction cooldown event. This report summarizes safety testing and post-safety testing PIE conducted at ORNL on loose particles extracted from irradiated AGR-1 Compact 4-4-2.« less

  13. 34 CFR 300.156 - Personnel qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... children with disabilities. (c) Qualifications for special education teachers. The qualifications described... personnel to provide special education and related services under this part to children with disabilities... 34 Education 2 2011-07-01 2010-07-01 true Personnel qualifications. 300.156 Section 300.156...

  14. 5 CFR 319.302 - Individual qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Individual qualifications. 319.302... Individual qualifications. Agency heads are delegated authority to approve the qualifications of individuals appointed to SL and ST positions. The agency head must determine that the individual meets the...

  15. 10 CFR 603.510 - Recipient qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Recipient qualifications. 603.510 Section 603.510 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Pre-Award Business Evaluation Recipient Qualification § 603.510 Recipient qualifications. Prior to award of a TIA, the...

  16. 10 CFR 603.510 - Recipient qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Recipient qualifications. 603.510 Section 603.510 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Pre-Award Business Evaluation Recipient Qualification § 603.510 Recipient qualifications. Prior to award of a TIA, the...

  17. Space Shuttle solid rocket motor /SRM/ development and qualification

    NASA Technical Reports Server (NTRS)

    Lund, R. K.; Brinton, B. C.

    1980-01-01

    The configuration of the reusable Space Shuttle solid rocket motors is described. In addition, their design evolution is reviewed, noting that the requirement that certain components be recovered, refurbished, and used on as many as 20 flights dictated a conservative design approach, the validity of which has been proven by successful testing of all development and qualification motors. Aspects discussed include ballistics, the motor case, nozzle, nozzle materials, and the ignition system. Finally, summary results of the first two of three qualification motor firings designated QM-1 and QM-2 are presented.

  18. 42 CFR 84.252 - Gas masks; requirements and tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Gas masks; requirements and tests. 84.252 Section... Respirators § 84.252 Gas masks; requirements and tests. (a) Except for the tests prescribed in § 84.126, the minimum requirements and performance tests for gas masks, prescribed in Subpart I of this part, are...

  19. BSM Delta Qualification 2, volume 2

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This report, presented in three volumes, provides the results of a two-motor Delta Qualification 2 program conducted in 1993 to certify the following enhancements for incorporation into booster separation motor (BSM) flight hardware: vulcanized-in-place nozzle aft closure insulation; new iso-static ATJ bulk graphite throat insert material; adhesive EA 9394 for bonding the nozzle throat, igniter grain rod/centering insert/igniter case; deletion of the igniter adapter insulator ring; deletion of the igniter adapter/igniter case interface RTV; and deletion of loctite from igniter retainer plate threads. The enhancements above directly resulted from (1) the BSM total quality management (TQM) team initiatives to enhance the BSM producibility, and (2) the necessity to qualify new throat insert and adhesive systems to replace existing materials that will not be available. Testing was completed at both the component and motor levels. Component testing was accomplished to screen candidate materials (e.g., throat materials, adhesive systems) and to optimize processes (e.g., aft closure insulator vulcanization approach) prior to their incorporation into the test motors. Motor tests -- consisting of two motors, randomly selected by USBI's on-site quality personnel from production lot AAY, which were modified to accept the enhancements -- were completed to provide the final qualification of the enhancements for incorporation into flight hardware. Volume 2 details the environmental testing (vibration and shock) conducted at Marshall Space Flight Center (MSFC) to which the motors were subjected prior to static tests.

  20. 29 CFR 32.14 - Job qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 1 2014-07-01 2013-07-01 true Job qualifications. 32.14 Section 32.14 Labor Office of the... FINANCIAL ASSISTANCE Employment Practices and Employment Related Training Participation § 32.14 Job... appropriateness of all job qualifications to ensure that to the extent job qualifications tend to exclude...

  1. 29 CFR 32.14 - Job qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 1 2013-07-01 2013-07-01 false Job qualifications. 32.14 Section 32.14 Labor Office of the... FINANCIAL ASSISTANCE Employment Practices and Employment Related Training Participation § 32.14 Job... appropriateness of all job qualifications to ensure that to the extent job qualifications tend to exclude...

  2. 29 CFR 32.14 - Job qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Job qualifications. 32.14 Section 32.14 Labor Office of the... FINANCIAL ASSISTANCE Employment Practices and Employment Related Training Participation § 32.14 Job... appropriateness of all job qualifications to ensure that to the extent job qualifications tend to exclude...

  3. 29 CFR 32.14 - Job qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 1 2012-07-01 2012-07-01 false Job qualifications. 32.14 Section 32.14 Labor Office of the... FINANCIAL ASSISTANCE Employment Practices and Employment Related Training Participation § 32.14 Job... appropriateness of all job qualifications to ensure that to the extent job qualifications tend to exclude...

  4. 29 CFR 32.14 - Job qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 1 2011-07-01 2011-07-01 false Job qualifications. 32.14 Section 32.14 Labor Office of the... FINANCIAL ASSISTANCE Employment Practices and Employment Related Training Participation § 32.14 Job... appropriateness of all job qualifications to ensure that to the extent job qualifications tend to exclude...

  5. 10 CFR 603.510 - Recipient qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Evaluation Recipient Qualification § 603.510 Recipient qualifications. Prior to award of a TIA, the... for awarding a grant or cooperative agreement. If the recipient is a consortium that is not formally... 10 Energy 4 2014-01-01 2014-01-01 false Recipient qualifications. 603.510 Section 603.510 Energy...

  6. 10 CFR 603.510 - Recipient qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Evaluation Recipient Qualification § 603.510 Recipient qualifications. Prior to award of a TIA, the... for awarding a grant or cooperative agreement. If the recipient is a consortium that is not formally... 10 Energy 4 2011-01-01 2011-01-01 false Recipient qualifications. 603.510 Section 603.510 Energy...

  7. 10 CFR 603.510 - Recipient qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Evaluation Recipient Qualification § 603.510 Recipient qualifications. Prior to award of a TIA, the... for awarding a grant or cooperative agreement. If the recipient is a consortium that is not formally... 10 Energy 4 2012-01-01 2012-01-01 false Recipient qualifications. 603.510 Section 603.510 Energy...

  8. 42 CFR 493.1357 - Standard; laboratory director qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Standard; laboratory director qualifications. 493... HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION LABORATORY REQUIREMENTS Personnel for Nonwaived Testing Laboratories Performing Provider-Performed Microscopy (ppm) Procedures § 493.1357 Standard...

  9. 42 CFR 493.1357 - Standard; laboratory director qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Standard; laboratory director qualifications. 493... HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION LABORATORY REQUIREMENTS Personnel for Nonwaived Testing Laboratories Performing Provider-Performed Microscopy (ppm) Procedures § 493.1357 Standard...

  10. Qualification of submerged-arc narrow strip cladding process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ayres, P.S.; Gottschling, J.D.; Jeffers, G.K.

    1975-08-01

    An unique narrow strip cladding process for use on both plate and forging material for nuclear components was developed. The qualification testing of this low-heat input process for cladding nuclear components, including those of SA508 Class 2 material is described. The theory that explains the acceptable results of these tests is also given. (auth)

  11. Qualification of submerged-arc narrow strip cladding process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ayres, P.S.; Gottschling, J.D.; Jeffers, G.K.

    1976-03-01

    Babcock and Wilcox has developed an unique narrow strip cladding process for use on both plate and forging material for nuclear components. The qualification testing of this low-heat input process for cladding nuclear components is described, including those of SA508 Class 2 material. The theory that explains the acceptable results of these tests is also given.

  12. Prognostics-based qualification of high-power white LEDs using Lévy process approach

    NASA Astrophysics Data System (ADS)

    Yung, Kam-Chuen; Sun, Bo; Jiang, Xiaopeng

    2017-01-01

    Due to their versatility in a variety of applications and the growing market demand, high-power white light-emitting diodes (LEDs) have attracted considerable attention. Reliability qualification testing is an essential part of the product development process to ensure the reliability of a new LED product before its release. However, the widely used IES-TM-21 method does not provide comprehensive reliability information. For more accurate and effective qualification, this paper presents a novel method based on prognostics techniques. Prognostics is an engineering technology predicting the future reliability or determining the remaining useful lifetime (RUL) of a product by assessing the extent of deviation or degradation from its expected normal operating conditions. A Lévy subordinator of a mixed Gamma and compound Poisson process is used to describe the actual degradation process of LEDs characterized by random sporadic small jumps of degradation degree, and the reliability function is derived for qualification with different distribution forms of jump sizes. The IES LM-80 test results reported by different LED vendors are used to develop and validate the qualification methodology. This study will be helpful for LED manufacturers to reduce the total test time and cost required to qualify the reliability of an LED product.

  13. BSM Delta qualification 2, volume 1

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This report, presented in three volumes, provides the results of a two-motor Delta Qualification 2 program conducted in 1993 to certify the following enhancements for incorporation into Booster Separation Motor (BSM) flight hardware: (1) vulcanized-in-place nozzle aft closure insulation; (2) new isostatic ATJ bulk graphite throat insert material; (3) adhesive EA 9394 for bonding the nozzle throat, igniter grain rod/centering insert/igniter case; (4) deletion of the igniter adapter insulator ring; (5) deletion of igniter adapter/igniter case interface RTV; and (6) deletion of Loctite from igniter retainer plate threads. The enhancements above directly resulted from (1) the BSM Total Quality Management (TQM) Team initiatives to enhance the BSM producibility, and (2) the necessity to qualify new throat insert and adhesive systems to replace existing materials that will not be available. Testing was completed at both the component and motor levels. Component testing was accomplished to screen candidate materials (e.g., throat materials, adhesive systems) and to optimize processes (e.g., aft closure insulator vulcanization approach) prior to their incorporation into the test motors. Motor testing - consisting of two motors, randomly selected by USBI's onsite quality personnel from production lot AAY, which were modified to accept the enhancements - were completed to provide the final qualification of the enhancements for incorporation into flight hardware. It is concluded that all of the enhancements herein tested are qualified to be incorporated into flight hardware for the BSM.

  14. 14 CFR 60.27 - Automatic loss of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Automatic loss of qualification and procedures for restoration of qualification. 60.27 Section 60.27 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  15. 14 CFR 60.29 - Other losses of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Other losses of qualification and procedures for restoration of qualification. 60.29 Section 60.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  16. 14 CFR 60.27 - Automatic loss of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Automatic loss of qualification and procedures for restoration of qualification. 60.27 Section 60.27 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  17. 14 CFR 60.29 - Other losses of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Other losses of qualification and procedures for restoration of qualification. 60.29 Section 60.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  18. 14 CFR 60.29 - Other losses of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Other losses of qualification and procedures for restoration of qualification. 60.29 Section 60.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  19. 14 CFR 60.29 - Other losses of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Other losses of qualification and procedures for restoration of qualification. 60.29 Section 60.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  20. 14 CFR 60.27 - Automatic loss of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Automatic loss of qualification and procedures for restoration of qualification. 60.27 Section 60.27 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  1. 14 CFR 60.29 - Other losses of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Other losses of qualification and procedures for restoration of qualification. 60.29 Section 60.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  2. 14 CFR 60.27 - Automatic loss of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Automatic loss of qualification and procedures for restoration of qualification. 60.27 Section 60.27 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  3. 14 CFR 60.27 - Automatic loss of qualification and procedures for restoration of qualification.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Automatic loss of qualification and procedures for restoration of qualification. 60.27 Section 60.27 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...

  4. 49 CFR 391.41 - Physical qualifications for drivers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 5 2012-10-01 2012-10-01 false Physical qualifications for drivers. 391.41... QUALIFICATIONS OF DRIVERS AND LONGER COMBINATION VEHICLE (LCV) DRIVER INSTRUCTORS Physical Qualifications and Examinations § 391.41 Physical qualifications for drivers. (a)(1)(i) A person subject to this part must not...

  5. 49 CFR 391.41 - Physical qualifications for drivers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Physical qualifications for drivers. 391.41... QUALIFICATIONS OF DRIVERS AND LONGER COMBINATION VEHICLE (LCV) DRIVER INSTRUCTORS Physical Qualifications and Examinations § 391.41 Physical qualifications for drivers. (a)(1)(i) A person subject to this part must not...

  6. 49 CFR 391.41 - Physical qualifications for drivers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false Physical qualifications for drivers. 391.41... QUALIFICATIONS OF DRIVERS AND LONGER COMBINATION VEHICLE (LCV) DRIVER INSTRUCTORS Physical Qualifications and Examinations § 391.41 Physical qualifications for drivers. (a)(1)(i) A person subject to this part must not...

  7. 49 CFR 391.41 - Physical qualifications for drivers.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 5 2014-10-01 2014-10-01 false Physical qualifications for drivers. 391.41... QUALIFICATIONS OF DRIVERS AND LONGER COMBINATION VEHICLE (LCV) DRIVER INSTRUCTORS Physical Qualifications and Examinations § 391.41 Physical qualifications for drivers. (a)(1)(i) A person subject to this part must not...

  8. 14 CFR 121.915 - Continuing qualification curriculum.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Continuing qualification curriculum. 121... Continuing qualification curriculum. Each continuing qualification curriculum must contain training and... training device as approved in the certificate holder's curriculum that must be completed during each...

  9. 49 CFR 180.507 - Qualification of tank cars.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Qualification of tank cars. 180.507 Section 180... QUALIFICATION AND MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Tank Cars § 180.507 Qualification of tank cars. (a) Each tank car marked as meeting a “DOT” specification or any other tank car used...

  10. Design, fabrication, test, and qualification and price analysis of third generation design solar cell modules

    NASA Astrophysics Data System (ADS)

    Shepard, N. F.

    1980-03-01

    The Block 4 shingle type module makes it possible to apply a photovoltaic array to the sloping roof of a residential building by simply nailing the overlapping hexagon shaped shingles to the plywood roof sheathing. This third-generation shingle module design consists of nineteen series connected 100 mm diameter solar cells which are arranged in a closely packed hexagon configuration to provide in excess of 75 watts/sq m of exposed module area under standard operating conditions. The solar cells are individually bonded to the embossed underside of a 4.4 mm thick thermally tempered piece of glass. An experimental silicone pottant was used as the transparent bonding adhesive between the cells and glass. The semi-flexible portion of each shingle module is a composite laminate construction consisting of an outer layer of FLEXSEAL bonded to an inner core of closed cell polyethylene foam. Silaprene is used as the substrate laminating adhesive. The module design has satisfactorily survived qualification testing program which includes 50 thermal cycles between -40 and +90 C, a seven day temperature-humidity exposure test, and a wind resistance test.

  11. Design, fabrication, test, and qualification and price analysis of third generation design solar cell modules

    NASA Technical Reports Server (NTRS)

    Shepard, N. F.

    1980-01-01

    The Block 4 shingle type module makes it possible to apply a photovoltaic array to the sloping roof of a residential building by simply nailing the overlapping hexagon shaped shingles to the plywood roof sheathing. This third-generation shingle module design consists of nineteen series connected 100 mm diameter solar cells which are arranged in a closely packed hexagon configuration to provide in excess of 75 watts/sq m of exposed module area under standard operating conditions. The solar cells are individually bonded to the embossed underside of a 4.4 mm thick thermally tempered piece of glass. An experimental silicone pottant was used as the transparent bonding adhesive between the cells and glass. The semi-flexible portion of each shingle module is a composite laminate construction consisting of an outer layer of FLEXSEAL bonded to an inner core of closed cell polyethylene foam. Silaprene is used as the substrate laminating adhesive. The module design has satisfactorily survived qualification testing program which includes 50 thermal cycles between -40 and +90 C, a seven day temperature-humidity exposure test, and a wind resistance test.

  12. Development and Realization of a Shock Wave Test on Expert Flap Qualification Model

    NASA Astrophysics Data System (ADS)

    De Fruytier, C.; Dell'Orco, F.; Ullio, R.; Gomiero, F.

    2012-07-01

    This paper presents the methodology and the results of the shock test campaign conducted by TAS-I and TAS ETCA to qualify the EXPERT Flap in regards of shock wave and acoustic load generated by pyrocord detonation at stages 2/3 separation phase of the EXPERT vehicle. The design concept of the open flap (manufactured by MT AEROSPACE) is a fully integral manufactured, four sided control surface, with an additional stiffening rib and flanges to meet the first eigenfrequency and the allowable deformation requirement with a minimum necessary mass. The objectives were to reproduce equivalent loading at test article level in terms of pulse duration, front pressure, front velocity and acoustic emission. The Thales Alenia Space ETCA pyrotechnic shock test device is usually used to produce high level shocks by performing a shock on a test fixture supporting the unit under test. In this case, the facility has been used to produce a shock wave, with different requested physical characteristics, directed to the unit under test. Different configurations have been tried on a dummy of the unit to test, following an empirical process. This unusual work has lead to the definition of a nominal set- up meeting the requested physical parameters. Two blast sensors have been placed to acquire the pressure around the flap. The distance between the two sensors has allowed estimating the front pressure velocity. Then, several locations have been selected to acquire the acceleration responses on the unit when it was submitted to this environment. Additionally, a “standard” shock test has been performed on this model. The qualification of the flap, in regards of shock environment, has been successfully conducted.

  13. Social Partnership in Accrediting Lithuanian VET Qualifications

    ERIC Educational Resources Information Center

    Tutlys, Vidmantas; Kaminskiene, Lina

    2008-01-01

    This article examines social partnership in accrediting qualifications in Lithuania. It defines the factors influencing social partnership and surveys future development perspectives, referring to the creation and implementation of the national qualifications system in Lithuania. Social partnership in qualifications accreditation is regarded as a…

  14. Results from the DOE Advanced Gas Reactor Fuel Development and Qualification Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David Petti

    2014-06-01

    Modular HTGR designs were developed to provide natural safety, which prevents core damage under all design basis accidents and presently envisioned severe accidents. The principle that guides their design concepts is to passively maintain core temperatures below fission product release thresholds under all accident scenarios. This level of fuel performance and fission product retention reduces the radioactive source term by many orders of magnitude and allows potential elimination of the need for evacuation and sheltering beyond a small exclusion area. This level, however, is predicated on exceptionally high fuel fabrication quality and performance under normal operation and accident conditions. Germanymore » produced and demonstrated high quality fuel for their pebble bed HTGRs in the 1980s, but no U.S. manufactured fuel had exhibited equivalent performance prior to the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program. The design goal of the modular HTGRs is to allow elimination of an exclusion zone and an emergency planning zone outside the plant boundary fence, typically interpreted as being about 400 meters from the reactor. To achieve this, the reactor design concepts require a level of fuel integrity that is better than that claimed for all prior US manufactured TRISO fuel, by a few orders of magnitude. The improved performance level is about a factor of three better than qualified for German TRISO fuel in the 1980’s. At the start of the AGR program, without a reactor design concept selected, the AGR fuel program selected to qualify fuel to an operating envelope that would bound both pebble bed and prismatic options. This resulted in needing a fuel form that could survive at peak fuel temperatures of 1250°C on a time-averaged basis and high burnups in the range of 150 to 200 GWd/MTHM (metric tons of heavy metal) or 16.4 to 21.8% fissions per initial metal atom (FIMA). Although Germany has demonstrated excellent performance of TRISO

  15. Video of SLS Liquid Hydrogen Tank Qualification Structural Test Article Being Moved to Cell E at NASA’s Michoud Assembly Facility

    NASA Image and Video Library

    2017-06-29

    This video shows the Space Launch System liquid hydrogen tank structural qualification test article being moved to Building 110, Cell at NASA's Michoud Assembly Facility in New Orleans. The rocket's liquid hydrogen tank, which is the propellant tank that joins to the engine section of the 212-foot tall core stage, will carry cryogenic liquid hydrogen that propels the rocket. This test article build at Michoud is being prepared for testing at NASA's Marshall Space Flight Center in Huntsville, Alabama. There, it will be subjected to millions of pounds of force during testing to ensure the hardware can withstand the incredible stresses of launch.

  16. The European Medicines Agency experience with biomarker qualification.

    PubMed

    Manolis, Efthymios; Koch, Armin; Deforce, Dieter; Vamvakas, Spiros

    2015-01-01

    Since the launch of the qualification process in 2009, the CHMP reviewed/is reviewing 48 requests for qualification advice or opinion (as of Sept 2013) related to biomarkers (BM) or other novel drug development tools (e.g. patient reported outcome measures, modeling, and statistical methods). The qualification opinions are available on the EMA website (Qualification of novel methodologies for medicine development, http://www.ema.europa.eu/ema/index.jsp?curl=pages/regulation/document_listing/document_listing_000319.jsp&mid=WC0b01ac0580022bb0#section2 , 2013). Also there is a trend of increasing numbers of qualification requests to CHMP, indicative of the pace that targeted drug development and personalized medicine is gaining and the need to bring the new tools from research to drug development and clinical use. This chapter will focus on the regulatory experience gained so far from the CHMP qualification procedure. Basic qualification principles will be presented. Through qualification examples, we will elaborate on common grounds and divergences between the different stakeholders.

  17. Ares I Integrated Test Approach

    NASA Technical Reports Server (NTRS)

    Taylor, Jim

    2008-01-01

    This slide presentation reviews the testing approach that NASA is developing for the Ares I launch vehicle. NASA is planning a complete series of development, qualification and verification tests. These include: (1) Upper stage engine sea-level and altitude testing (2) First stage development and qualification motors (3) Upper stage structural and thermal development and qualification test articles (4) Main Propulsion Test Article (MPTA) (5) Upper stage green run testing (6) Integrated Vehicle Ground Vibration Testing (IVGVT) and (7) Aerodynamic characterization testing.

  18. 30 CFR 7.102 - Exhaust gas cooling efficiency test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Exhaust gas cooling efficiency test. 7.102 Section 7.102 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING....102 Exhaust gas cooling efficiency test. (a) Test procedures. (1) Follow the procedures specified in...

  19. Large Bore Powder Gun Qualification (U)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rabern, Donald A.; Valdiviez, Robert

    A Large Bore Powder Gun (LBPG) is being designed to enable experimentalists to characterize material behavior outside the capabilities of the NNSS JASPER and LANL TA-55 PF-4 guns. The combination of these three guns will create a capability to conduct impact experiments over a wide range of pressures and shock profiles. The Large Bore Powder Gun will be fielded at the Nevada National Security Site (NNSS) U1a Complex. The Complex is nearly 1000 ft below ground with dedicated drifts for testing, instrumentation, and post-shot entombment. To ensure the reliability, safety, and performance of the LBPG, a qualification plan has beenmore » established and documented here. Requirements for the LBPG have been established and documented in WE-14-TR-0065 U A, Large Bore Powder Gun Customer Requirements. The document includes the requirements for the physics experiments, the gun and confinement systems, and operations at NNSS. A detailed description of the requirements is established in that document and is referred to and quoted throughout this document. Two Gun and Confinement Systems will be fielded. The Prototype Gun will be used primarily to characterize the gun and confinement performance and be the primary platform for qualification actions. This gun will also be used to investigate and qualify target and diagnostic modifications through the life of the program (U1a.104 Drift). An identical gun, the Physics Gun, will be fielded for confirmatory and Pu experiments (U1a.102D Drift). Both guns will be qualified for operation. The Gun and Confinement System design will be qualified through analysis, inspection, and testing using the Prototype Gun for the majority of process. The Physics Gun will be qualified through inspection and a limited number of qualification tests to ensure performance and behavior equivalent to the Prototype gun. Figure 1.1 shows the partial configuration of U1a and the locations of the Prototype and Physics Gun/Confinement Systems.« less

  20. Actual waste demonstration of the nitric-glycolic flowsheet for sludge batch 9 qualification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Newell, D.; Pareizs, J.; Martino, C.

    For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savannah River National Laboratory (SRNL) performs qualification testing to demonstrate that the sludge batch is processable. Based on the results of this actual-waste qualification and previous simulant studies, SRNL recommends implementation of the nitric-glycolic acid flowsheet in DWPF. Other recommendations resulting from this demonstration are reported in section 5.0.

  1. 14 CFR 121.453 - Flight engineer qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Flight engineer qualifications. 121.453... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Crewmember Qualifications § 121.453 Flight engineer qualifications. (a) No certificate holder may use any person nor may any person serve as a flight engineer on an...

  2. 14 CFR 121.453 - Flight engineer qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Flight engineer qualifications. 121.453... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Crewmember Qualifications § 121.453 Flight engineer qualifications. (a) No certificate holder may use any person nor may any person serve as a flight engineer on an...

  3. 14 CFR 121.453 - Flight engineer qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Flight engineer qualifications. 121.453... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Crewmember Qualifications § 121.453 Flight engineer qualifications. (a) No certificate holder may use any person nor may any person serve as a flight engineer on an...

  4. 14 CFR 121.453 - Flight engineer qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Flight engineer qualifications. 121.453... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Crewmember Qualifications § 121.453 Flight engineer qualifications. (a) No certificate holder may use any person nor may any person serve as a flight engineer on an...

  5. 14 CFR 121.453 - Flight engineer qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Flight engineer qualifications. 121.453... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Crewmember Qualifications § 121.453 Flight engineer qualifications. (a) No certificate holder may use any person nor may any person serve as a flight engineer on an...

  6. 29 CFR 1926.1428 - Signal person qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false Signal person qualifications. 1926.1428 Section 1926.1428... Construction § 1926.1428 Signal person qualifications. (a) The employer of the signal person must ensure that each signal person meets the Qualification Requirements (paragraph (c) of this section) prior to giving...

  7. 29 CFR 1926.1428 - Signal person qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 8 2014-07-01 2014-07-01 false Signal person qualifications. 1926.1428 Section 1926.1428... Construction § 1926.1428 Signal person qualifications. (a) The employer of the signal person must ensure that each signal person meets the Qualification Requirements (paragraph (c) of this section) prior to giving...

  8. 29 CFR 1926.1428 - Signal person qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 8 2013-07-01 2013-07-01 false Signal person qualifications. 1926.1428 Section 1926.1428... Construction § 1926.1428 Signal person qualifications. (a) The employer of the signal person must ensure that each signal person meets the Qualification Requirements (paragraph (c) of this section) prior to giving...

  9. 32 CFR 171.4 - Qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 1 2014-07-01 2014-07-01 false Qualifications. 171.4 Section 171.4 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DEFENSE CONTRACTING IMPLEMENTATION OF WILDFIRE SUPPRESSION AIRCRAFT TRANSFER ACT OF 1996 § 171.4 Qualifications. The Secretary of Agriculture...

  10. 32 CFR 171.4 - Qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 1 2013-07-01 2013-07-01 false Qualifications. 171.4 Section 171.4 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DEFENSE CONTRACTING IMPLEMENTATION OF WILDFIRE SUPPRESSION AIRCRAFT TRANSFER ACT OF 1996 § 171.4 Qualifications. The Secretary of Agriculture...

  11. 32 CFR 171.4 - Qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 1 2012-07-01 2012-07-01 false Qualifications. 171.4 Section 171.4 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DEFENSE CONTRACTING IMPLEMENTATION OF WILDFIRE SUPPRESSION AIRCRAFT TRANSFER ACT OF 1996 § 171.4 Qualifications. The Secretary of Agriculture...

  12. 32 CFR 171.4 - Qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false Qualifications. 171.4 Section 171.4 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DEFENSE CONTRACTING IMPLEMENTATION OF WILDFIRE SUPPRESSION AIRCRAFT TRANSFER ACT OF 1996 § 171.4 Qualifications. The Secretary of Agriculture...

  13. 42 CFR 61.5 - Qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Qualifications. 61.5 Section 61.5 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Regular Fellowships § 61.5 Qualifications. In order to qualify for a regular fellowship, an...

  14. 42 CFR 61.5 - Qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Qualifications. 61.5 Section 61.5 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Regular Fellowships § 61.5 Qualifications. In order to qualify for a regular fellowship, an...

  15. 42 CFR 61.5 - Qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Qualifications. 61.5 Section 61.5 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Regular Fellowships § 61.5 Qualifications. In order to qualify for a regular fellowship, an...

  16. 42 CFR 61.5 - Qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Qualifications. 61.5 Section 61.5 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Regular Fellowships § 61.5 Qualifications. In order to qualify for a regular fellowship, an...

  17. 42 CFR 61.5 - Qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Qualifications. 61.5 Section 61.5 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Regular Fellowships § 61.5 Qualifications. In order to qualify for a regular fellowship, an...

  18. Sample results from the integrated salt disposition program macrobatch 6 tank 21H qualifications MST solids sample

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, T. B.

    2013-02-26

    Savannah River National Laboratory (SRNL) performed experiments on qualification material for use in the Integrated Salt Disposition Program (ISDP) Batch 6 processing. As part of this qualification work, SRNL performed an Actinide Removal Process (ARP) test. From this test, the residual monosodium titanate (MST) was analyzed for radionuclide uptake. The results of these analyses are reported and are within historical precedent.

  19. Exhaust gas treatment in testing nuclear rocket engines

    NASA Astrophysics Data System (ADS)

    Zweig, Herbert R.; Fischler, Stanley; Wagner, William R.

    1993-01-01

    With the exception of the last test series of the Rover program, Nuclear Furnace 1, test-reactor and rocket engine hydrogen gas exhaust generated during the Rover/NERVA program was released directly to the atmosphere, without removal of the associated fission products and other radioactive debris. Current rules for nuclear facilities (DOE Order 5480.6) are far more protective of the general environment; even with the remoteness of the Nevada Test Site, introduction of potentially hazardous quantities of radioactive waste into the atmosphere must be scrupulously avoided. The Rocketdyne treatment concept features a diffuser to provide altitude simulation and pressure recovery, a series of heat exchangers to gradually cool the exhaust gas stream to 100 K, and an activated charcoal bed for adsorption of inert gases. A hydrogen-gas fed ejector provides auxiliary pumping for startup and shutdown of the engine. Supplemental filtration to remove particulates and condensed phases may be added at appropriate locations in the system. The clean hydrogen may be exhausted to the atmosphere and flared, or the gas may be condensed and stored for reuse in testing. The latter approach totally isolates the working gas from the environment.

  20. 49 CFR 192.227 - Qualification of welders.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Welding of Steel in Pipelines § 192.227 Qualification... earlier edition. (b) A welder may qualify to perform welding on pipe to be operated at a pressure that... process to be used, under the test set forth in section I of Appendix C of this part. Each welder who is...

  1. Trial-Run of a Junction-Box Attachment Test for Use in Photovoltaic Module Qualification: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, D. C.; Deibert, S. L.; Wohlgemuth, J. H.

    Engineering robust adhesion of the junction box (j-box) is a hurdle typically encountered by photovoltaic module manufacturers during product development and manufacturing process control. There are historical incidences of adverse effects (e.g., fires) caused when the j-box/adhesive/module system has failed in the field. The addition of a weight to the j-box during the 'damp-heat,' 'thermal-cycle,' or 'creep' tests within the IEC qualification protocol is proposed to verify the basic robustness of the adhesion system. The details of the proposed test are described, in addition to a trial-run of the test procedure. The described experiments examine four moisture-cured silicones, four foammore » tapes, and a hot-melt adhesive used in conjunction with glass, KPE, THV, and TPE substrates. For the purpose of validating the experiment, j-boxes were adhered to a substrate, loaded with a prescribed weight, and then subjected to aging. The replicate mock-modules were aged in an environmental chamber (at 85 degrees C/85% relative humidity for 1000 hours; then 100 degrees C/<10% relative humidity for 200 hours) or fielded in Golden (CO), Miami (FL), and Phoenix (AZ) for one year. Attachment strength tests, including pluck and shear test geometries, were also performed on smaller component specimens.« less

  2. Trial Run of a Junction-Box Attachment Test for Use in Photovoltaic Module Qualification (Presentation)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, D.; Deibert, S.; Wohlgemuth, J.

    Engineering robust adhesion of the junction-box (j-box) is a hurdle typically encountered by photovoltaic (PV) module manufacturers during product development and manufacturing process control. There are historical incidences of adverse effects (e.g., fires), caused when the j-box/adhesive/module system has failed in the field. The addition of a weight to the j-box during the 'damp-heat', 'thermal-cycle', or 'creep' tests within the IEC qualification protocol is proposed to verify the basic robustness of the adhesion system. The details of the proposed test are described, in addition to a trial run of the test procedure. The described experiments examine 4 moisture-cured silicones, 4more » foam tapes, and a hot-melt adhesive used in conjunction with glass, KPE, THV, and TPE substrates. For the purpose of validating the experiment, j-boxes were adhered to a substrate, loaded with a prescribed weight, and then subjected to aging. The replicate mock-modules were aged in an environmental chamber (at 85 deg C/85% relative humidity for 1000 hours; then 100 degrees C/<10% relative humidity for 200 hours) or fielded in Golden, Miami, and Phoenix for 1 year. Attachment strength tests, including pluck and shear test geometries, were also performed on smaller component specimens.« less

  3. F-1 Gas Generator test

    NASA Image and Video Library

    2015-09-03

    THE GAS GENERATOR TO AN F-1 ENGINE, THE MOST POWERFUL ROCKET ENGINE EVER BUILT, IS TEST-FIRED AT NASA'S MARSHALL SPACE FLIGHT CENTER IN HUNTSVILLE, ALABAMA, ON SEPT. 3. ALTHOUGH THE ENGINE WAS ORIGINALLY BUILT TO POWER THE SATURN V ROCKETS DURING AMERICA'S MISSIONS TO THE MOON, THIS TEST ARTICLE HAD NEW PARTS CREATED USING ADDITIVE MANUFACTURING, OR 3-D PRINTING, TO TEST THE VIABILITY OF THE TECHNOLOGY FOR BUILDING NEW ENGINE DESIGNS.

  4. VEGA Launch Vehicle Dynamic Environment: Flight Experience and Qualification Status

    NASA Astrophysics Data System (ADS)

    Di Trapani, C.; Fotino, D.; Mastrella, E.; Bartoccini, D.; Bonnet, M.

    2014-06-01

    VEGA Launch Vehicle (LV) during flight is equipped with more than 400 sensors (pressure transducers, accelerometers, microphones, strain gauges...) aimed to catch the physical phenomena occurring during the mission. Main objective of these sensors is to verify that the flight conditions are compliant with the launch vehicle and satellite qualification status and to characterize the phenomena that occur during flight. During VEGA development, several test campaigns have been performed in order to characterize its dynamic environment and identify the worst case conditions, but only with the flight data analysis is possible to confirm the worst cases identified and check the compliance of the operative life conditions with the components qualification status.Scope of the present paper is to show a comparison of the sinusoidal dynamic phenomena that occurred during VEGA first and second flight and give a summary of the launch vehicle qualification status.

  5. Three field tests of a gas filter correlation radiometer

    NASA Technical Reports Server (NTRS)

    Campbell, S. A.; Casas, J. C.; Condon, E. P.

    1977-01-01

    Test flights to remotely measure nonurban carbon monoxide (CO) concentrations by gas filter correlation radiometry are discussed. The inferred CO concentrations obtained through use of the Gas Filter Correlation Radiometer (GFCR) agreed with independent measurements obtained by gas chromatography air sample bottle analysis to within 20 percent. The equipment flown on board the aircraft, the flight test procedure, the gas chromatograph direct air sampling procedure, and the GFCR data analysis procedure are reported.

  6. Cryogenic nitrogen as a transonic wind-tunnel test gas

    NASA Technical Reports Server (NTRS)

    Adcock, J. B.; Kilgore, R. A.; Ray, E. J.

    1975-01-01

    The test gas for the Langley Pilot Transonic Cryogenic Tunnel is nitrogen. Results from analytical and experimental studies that have verified cryogenic nitrogen as an acceptable test gas are reviewed. Real-gas isentropic and normal-shock flow solutions for nitrogen are compared to the ideal diatomic gas solutions. Experimental data demonstrate that for temperatures above the liquefaction boundaries there are no significant real-gas effects on two-dimensional airfoil pressure distributions. Results of studies to determine the minimum operating temperatures while avoiding appreciable effects due to liquefaction are included.

  7. STATUS OF TRISO FUEL IRRADIATIONS IN THE ADVANCED TEST REACTOR SUPPORTING HIGH-TEMPERATURE GAS-COOLED REACTOR DESIGNS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davenport, Michael; Petti, D. A.; Palmer, Joe

    2016-11-01

    The United States Department of Energy’s Advanced Reactor Technologies (ART) Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is irradiating up to seven low enriched uranium (LEU) tri-isotopic (TRISO) particle fuel (in compact form) experiments in the Advanced Test Reactor (ATR) located at the Idaho National Laboratory (INL). These irradiations and fuel development are being accomplished to support development of the next generation reactors in the United States. The experiments will be irradiated over the next several years to demonstrate and qualify new TRISO coated particle fuel for use in high temperature gas reactors. The goals of the experimentsmore » are to provide irradiation performance data to support fuel process development, to qualify fuel for normal operating conditions, to support development and validation of fuel performance and fission product transport models and codes, and to provide irradiated fuel and materials for post irradiation examination (PIE) and safety testing. The experiments, which will each consist of several independent capsules, will be irradiated in an inert sweep gas atmosphere with individual on-line temperature monitoring and control of each capsule. The sweep gas will also have on-line fission product monitoring on its effluent to track performance of the fuel in each individual capsule during irradiation. The first experiment (designated AGR-1) started irradiation in December 2006 and was completed in November 2009. The second experiment (AGR-2) started irradiation in June 2010 and completed in October 2013. The third and fourth experiments have been combined into a single experiment designated (AGR-3/4), which started its irradiation in December 2011 and completed in April 2014. Since the purpose of this experiment was to provide data on fission product migration and retention in the NGNP reactor, the design of this experiment was significantly different from the first two experiments, though the

  8. Air Force Ni-Cd cell qualification program update

    NASA Technical Reports Server (NTRS)

    Hall, Steve; Brown, Harry; Collins, G.; Hwang, W.; Bui, Q.

    1993-01-01

    The generic qualification of aerospace nickel-cadmium cells is discussed. The test program includes the following: all available manufacturers, all available designs, cells from the previous program, and high and low orbit life cycling. It is the purpose of this program to characterize the beginning of life performance.

  9. 46 CFR 56.70-20 - Qualification, general.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Qualification, general. 56.70-20 Section 56.70-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Fabrication, Assembly and Erection § 56.70-20 Qualification, general. (a) Qualification of the welding procedures to be used, and of the...

  10. 46 CFR 56.70-20 - Qualification, general.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Qualification, general. 56.70-20 Section 56.70-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Fabrication, Assembly and Erection § 56.70-20 Qualification, general. (a) Qualification of the welding procedures to be used, and of the...

  11. 46 CFR 56.75-20 - Brazing qualification.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Brazing qualification. 56.75-20 Section 56.75-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Brazing § 56.75-20 Brazing qualification. (a) The qualification of the performance of brazers and brazing operators shall be in accordance...

  12. 46 CFR 56.70-20 - Qualification, general.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Qualification, general. 56.70-20 Section 56.70-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Fabrication, Assembly and Erection § 56.70-20 Qualification, general. (a) Qualification of the welding procedures to be used, and of the...

  13. 46 CFR 56.70-20 - Qualification, general.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Qualification, general. 56.70-20 Section 56.70-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Fabrication, Assembly and Erection § 56.70-20 Qualification, general. (a) Qualification of the welding procedures to be used, and of the...

  14. 46 CFR 56.70-20 - Qualification, general.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Qualification, general. 56.70-20 Section 56.70-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Fabrication, Assembly and Erection § 56.70-20 Qualification, general. (a) Qualification of the welding procedures to be used, and of the...

  15. 46 CFR 56.75-20 - Brazing qualification.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Brazing qualification. 56.75-20 Section 56.75-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Brazing § 56.75-20 Brazing qualification. (a) The qualification of the performance of brazers and brazing operators shall be in accordance...

  16. 46 CFR 56.75-20 - Brazing qualification.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Brazing qualification. 56.75-20 Section 56.75-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Brazing § 56.75-20 Brazing qualification. (a) The qualification of the performance of brazers and brazing operators shall be in accordance...

  17. 46 CFR 56.75-20 - Brazing qualification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Brazing qualification. 56.75-20 Section 56.75-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Brazing § 56.75-20 Brazing qualification. (a) The qualification of the performance of brazers and brazing operators shall be in accordance...

  18. 46 CFR 56.75-20 - Brazing qualification.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Brazing qualification. 56.75-20 Section 56.75-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Brazing § 56.75-20 Brazing qualification. (a) The qualification of the performance of brazers and brazing operators shall be in accordance...

  19. Unintended Consequences: How Qualification Constrains Innovation

    NASA Technical Reports Server (NTRS)

    Brice, Craig A.

    2011-01-01

    The development and implementation of new materials and manufacturing processes for aerospace application is often hindered by the high cost and long time span associated with current qualification procedures. The data requirements necessary for material and process qualification are extensive and often require millions of dollars and multiple years to complete. Furthermore, these qualification data can become obsolete for even minor changes to the processing route. This burden is a serious impediment to the pursuit of revolutionary new materials and more affordable processing methods for air vehicle structures. The application of integrated computational materials engineering methods to this problem can help to reduce the barriers to rapid insertion of new materials and processes. By establishing predictive capability for the development of microstructural features in relation to processing and relating this to critical property characteristics, a streamlined approach to qualification is possible. This paper critically examines the advantages and challenges to a modeling-assisted qualification approach for aerospace structural materials. An example of how this approach might apply towards the emerging field of additive manufacturing is discussed in detail.

  20. On the Use of 3dB Qualification Margin for Structural Parts on Expendable Launch Vehicles

    NASA Technical Reports Server (NTRS)

    Yunis, Isam

    2007-01-01

    The standard random vibration qualification test used for Expendable Launch Vehicle components is Maximum Predicted Environment (MPE) + 6dB for a duration of 4 times the service life of the part. This can be a severe qualification test for these fatigue-sensitive structures. This paper uses flight data from several launch vehicles to establish that reducing the qualification approach to MPE+3dB for the duration of the peak environment (1x life) is valid for fatigue-sensitive structural components. Items that can be classified as fatigue-sensitive are probes, ducts, tubing, bellows, hoses, and any non-functional structure. Non-functional structure may be flight critical or carry fluid, but it cannot include any moving parts or electronics. This reduced qualification approach does not include primary or secondary structure which would be exclusively designed by peak loads, either transient or quasi-static, that are so large and of so few cycles as to make fatigue a moot point.

  1. School Mathematics Qualifications and Work

    ERIC Educational Resources Information Center

    Drake, Pat; Noyes, Andrew; Wake, Geoff

    2012-01-01

    This article explores the relationship between school mathematics qualifications and the transition into employment. As part of a large-scale, three-year independent evaluation of pilot qualifications in 14-19 school mathematics, all 39 Sector Skills Councils and Employment Skills Boards in the UK were invited to provide evidence regarding their…

  2. TEST RESULTS FOR FUEL-CELL OPERATION ON LANDFILL GAS

    EPA Science Inventory

    Test results from a demonstration of fuel-cell (FC) energy recovery and control of landfill gas emissions are presented. The project addressed two major issues: (i) the design, construction, and testing of a landfill-gas cleanup system; and (ii) a field test of a commercial phos...

  3. 42 CFR 493.1405 - Standard; Laboratory director qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Osteopathic Board of Pathology or possess qualifications that are equivalent to those required for such... supervising non-waived laboratory testing; or (B) Beginning September 1, 1993, have at least 20 continuing... defined in § 493.1407; or (C) Laboratory training equivalent to paragraph (b)(2)(ii)(B) of this section...

  4. 42 CFR 493.1405 - Standard; Laboratory director qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Osteopathic Board of Pathology or possess qualifications that are equivalent to those required for such... supervising non-waived laboratory testing; or (B) Beginning September 1, 1993, have at least 20 continuing... defined in § 493.1407; or (C) Laboratory training equivalent to paragraph (b)(2)(ii)(B) of this section...

  5. 42 CFR 493.1405 - Standard; Laboratory director qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Osteopathic Board of Pathology or possess qualifications that are equivalent to those required for such... supervising non-waived laboratory testing; or (B) Beginning September 1, 1993, have at least 20 continuing... defined in § 493.1407; or (C) Laboratory training equivalent to paragraph (b)(2)(ii)(B) of this section...

  6. Thermography During Thermal Test of the Gaia Deployable Sunshield Assembly Qualification Model in the ESTEC Large Space Simulator

    NASA Astrophysics Data System (ADS)

    Simpson, R.; Broussely, M.; Edwards, G.; Robinson, D.; Cozzani, A.; Casarosa, G.

    2012-07-01

    The National Physical Laboratory (NPL) and The European Space Research and Technology Centre (ESTEC) have performed for the first time successful surface temperature measurements using infrared thermal imaging in the ESTEC Large Space Simulator (LSS) under vacuum and with the Sun Simulator (SUSI) switched on during thermal qualification tests of the GAIA Deployable Sunshield Assembly (DSA). The thermal imager temperature measurements, with radiosity model corrections, show good agreement with thermocouple readings on well characterised regions of the spacecraft. In addition, the thermal imaging measurements identified potentially misleading thermocouple temperature readings and provided qualitative real-time observations of the thermal and spatial evolution of surface structure changes and heat dissipation during hot test loadings, which may yield additional thermal and physical measurement information through further research.

  7. Development of high temperature liquid metal test facilities for qualification of materials and investigations of thermoelectrical modules

    NASA Astrophysics Data System (ADS)

    Onea, A.; Hering, W.; Reiser, J.; Weisenburger, A.; Diez de los Rios Ramos, N.; Lux, M.; Ziegler, R.; Baumgärtner, S.; Stieglitz, R.

    2017-07-01

    Three classes of experimental liquid metal facilities have been completed during the LIMTECH project aiming the qualification of materials, investigation of thermoelectrical modules, investigation of sodium transitional regimes and fundamental thermo-dynamical flows in concentrating solar power (CSP) relevant geometries. ATEFA facility is dedicated to basic science investigation focussed on the alkali metal thermal-to-electric converter (AMTEC) technology. Three SOLTEC facilities are aimed to be used in different laboratories for long term material investigation sodium environment up to a 1000 K temperature and for long term tests of AMTEC modules. The medium scale integral facility KASOLA is planned as the backbone for CSP development and demonstration.

  8. Space Qualification Issues in Acousto-optic and Electro-optic Devices

    NASA Technical Reports Server (NTRS)

    Prasad, Narasimha S.; Taylor, Edward W.; Trivedi, Sudhir; Kutcher, Sue; Soos, Jolanta

    2007-01-01

    Satellite and space-based applications of photonic devices and systems require operational reliability in the harsh environment of space for extended periods of time. This in turn requires every component of the systems and their packaging to meet space qualifications. Acousto- and electro-optical devices form the major components of many current space based optical systems, which is the focus of this paper. The major space qualification issues are related to: mechanical stability, thermal effects and operation of the devices in the naturally occurring space radiation environment. This paper will discuss acousto- and electro-optic materials and devices with respect to their stability against mechanical vibrations, thermal cycling in operating and non-operating conditions and device responses to space ionizing and displacement radiation effects. Selection of suitable materials and packaging to meet space qualification criteria will also be discussed. Finally, a general roadmap for production and testing of acousto- and electro-optic devices will be discussed.

  9. From Old to New: The Australian Qualifications Framework

    ERIC Educational Resources Information Center

    Wheelahan, Leesa

    2011-01-01

    The Australian Qualifications Framework (AQF) is a "first generation" qualifications framework that was established in 1995. Its purpose was to create "a comprehensive, nationally consistent yet flexible framework for all qualifications in post-compulsory education and training." It encompasses all post-compulsory…

  10. Field testing the Raman gas composition sensor for gas turbine operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buric, M.; Chorpening, B.; Mullem, J.

    2012-01-01

    A gas composition sensor based on Raman spectroscopy using reflective metal lined capillary waveguides is tested under field conditions for feed-forward applications in gas turbine control. The capillary waveguide enables effective use of low powered lasers and rapid composition determination, for computation of required parameters to pre-adjust burner control based on incoming fuel. Tests on high pressure fuel streams show sub-second time response and better than one percent accuracy on natural gas fuel mixtures. Fuel composition and Wobbe constant values are provided at one second intervals or faster. The sensor, designed and constructed at NETL, is packaged for Class Imore » Division 2 operations typical of gas turbine environments, and samples gas at up to 800 psig. Simultaneous determination of the hydrocarbons methane, ethane, and propane plus CO, CO2, H2O, H2, N2, and O2 are realized. The capillary waveguide permits use of miniature spectrometers and laser power of less than 100 mW. The capillary dimensions of 1 m length and 300 μm ID also enable a full sample exchange in 0.4 s or less at 5 psig pressure differential, which allows a fast response to changes in sample composition. Sensor operation under field operation conditions will be reported.« less

  11. 48 CFR 1553.209 - Contractor qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor qualifications. 1553.209 Section 1553.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209 Contractor qualifications. ...

  12. Extraction-Scrub-Strip test results from the interim Salt Disposition Program Macrobatch 9 Tank 21H qualification samples

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, T.

    2016-02-23

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 9 for the Interim Salt Disposition Program (ISDP). The Salt Batch 9 characterization results were previously reported. An Extraction-Scrub-Strip (ESS) test was performed to determine cesium distribution ratios (D (Cs)) and cesium concentration in the strip effluent and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a blend solvent prepared by SRNL that mimics the solvent composition currently being used atmore » the Modular Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D (Cs) value of 52.4. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This compares well against the predicted value of 56.5 from a recently created D (Cs) model« less

  13. Extraction, -scrub, -strip test results from the interim salt disposition program macrobatch 10 tank 21H qualification samples

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, T. B.

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). The Salt Batch 10 characterization results were previously reported.ii,iii An Extraction, -Scrub, -Strip (ESS) test was performed to determine cesium distribution ratios (D(Cs)) and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a sample of the NGS Blend solvent currently being used at the Modularmore » Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D(Cs) value of 110. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This is better than the predicted value of 39.8 from a recently created D(Cs) model.« less

  14. Qualifications Mismatch and Skills Mismatch

    ERIC Educational Resources Information Center

    Sutherland, John

    2012-01-01

    Purpose: The purpose of this paper is to estimate the extent of "over-qualification" (i.e. holding a qualification which is above that required to gain entry to the job being done) and "skills under-utilisation" (i.e. being in a job which does not make use of the knowledge and skills possessed) in the United Kingdom and to…

  15. Tests of Halon 1301 test gas simulants

    NASA Astrophysics Data System (ADS)

    Carhart, H. W.; Leonard, J. T.; Dinenno, P. J.; Starchville, M. D.; Forssell, E. W.; Wong, J. T.

    1989-02-01

    All new and retrofit installations of Halon 1301 (CBrF3) total flooding fire protection systems in shipboard machinery spaces require full acceptance discharge test. It is desirable to use a suitable simulant test gas in these tests in view of current and future regulation of Halon 1301. Sulfur hexafluoride, SF6, and chlorodifluromethane R-22, were identified as candidate simulants on the basis of their similarity in physical properties to Halon 1301. These two candidates were then evaluated on the basis of leakage from an enclosure. SF6 was determined to be an excellent simulant for Halon 1301 when considering leakage from an enclosure. Further testing of SF6 and R-22 is planned for other important aspects of Halon 1301 systems, i.e., flow hydraulics, initial mixing.

  16. 28 CFR 34.109 - Qualifications of peer reviewers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 34.109 Judicial Administration DEPARTMENT OF JUSTICE OJJDP COMPETITION AND PEER REVIEW PROCEDURES Peer Review § 34.109 Qualifications of peer reviewers. The general reviewer qualification criteria to...). Additional details concerning peer reviewer qualifications are provided in the OJJDP “Peer Review Guideline”. ...

  17. 28 CFR 50.24 - Annuity broker minimum qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Annuity broker minimum qualifications. 50....24 Annuity broker minimum qualifications. (a) Minimum standards. The Civil Division, United States Department of Justice, shall establish a list of annuity brokers who meet minimum qualifications for...

  18. 5 CFR 317.502 - Qualifications Review Board certification.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATIONS EMPLOYMENT IN THE SENIOR EXECUTIVE SERVICE Career Appointments § 317.502 Qualifications Review Board certification. (a) A Qualification Review Board (QRB) convened by OPM must certify the executive... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Qualifications Review Board certification...

  19. Evaluation production index of test well about tight gas reservoir

    NASA Astrophysics Data System (ADS)

    Huang, Xiaoliang; Yan, Wende; Yuan, Yingzhong; Li, Jiqiang; Li, Xiaoxue

    2018-03-01

    It is important that the tight gas reservoir is developed with test wells in the first place for the reasonable development, and it is necessary evaluation production index of test well. So, the paper will evaluate gas wells capacity, reasonable production, production decline law and producing reserves. Combining with calculation theory, comparison of adjacent wells and field practice, obtained reasonable production, production decline law and production reserves about test well, and through analysis the adjacent well obtained development experience and lessons about tight gas reservoir. The results show that the gas well development should pay attention to reasonable production and prevent energy falling too fast in tight gas reservoirs, The decline rule of wells with long production time should be analyzed by two stages. Through study, it will provide some reference and guidance for the development of gas wells in tight gas reservoirs.

  20. 48 CFR 53.209 - Contractor qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor qualifications. 53.209 Section 53.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.209 Contractor qualifications. ...

  1. Qualification of Bonding Process of Temperature Sensors to Extreme Temperature Deep Space Missions

    NASA Technical Reports Server (NTRS)

    Ramesham, Rajeshuni; Kitiyakara, Amarit; Redick, Richard; Sunada, Eric T.

    2011-01-01

    A process has been explored based on the state-of-the-art technology to bond the platinum resistance thermometer (PRT) on to potential aerospace material such as a flat aluminum surface and a flexible copper tube to simulate coaxial cable for the flight applications. Primarily, PRTs were inserted into a metal plated copper braid to avoid stresses on the sensor while attaching the sensor with braid to the base material for long duration deep space missions. Appropriate pretreatment has been implemented in this study to enhance the adhesion of the PRTs to the base material. NuSil product has been chosen in this research to attach PRT to the base materials. The resistance (approx.1.1 k(Omega)) of PRTs has been electrically monitored continuously during the qualification thermal cycling testing from -150 C to +120 C and -100 C to -35 C. The test hardware has been thermal cycled three times the mission life per JPL design principles for JUNO project. No PRT failures were observed during and after the PRT thermal cycling qualification test for extreme temperature environments. However, there were some failures associated with staking of the PRT pig tails as a result of thermal cycling qualification test.

  2. 14 CFR 121.439 - Pilot qualification: Recent experience.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Pilot qualification: Recent experience. 121... Pilot qualification: Recent experience. Link to an amendment published at 78 FR 67841, Nov. 12, 2013. (a... qualification: Recent experience. (f) Deviation authority based upon designation of related aircraft in...

  3. Qualification and Reliability for MEMS and IC Packages

    NASA Technical Reports Server (NTRS)

    Ghaffarian, Reza

    2004-01-01

    Advanced IC electronic packages are moving toward miniaturization from two key different approaches, front and back-end processes, each with their own challenges. Successful use of more of the back-end process front-end, e.g. microelectromechanical systems (MEMS) Wafer Level Package (WLP), enable reducing size and cost. Use of direct flip chip die is the most efficient approach if and when the issues of know good die and board/assembly are resolved. Wafer level package solve the issue of known good die by enabling package test, but it has its own limitation, e.g., the I/O limitation, additional cost, and reliability. From the back-end approach, system-in-a-package (SIAP/SIP) development is a response to an increasing demand for package and die integration of different functions into one unit to reduce size and cost and improve functionality. MEMS add another challenging dimension to electronic packaging since they include moving mechanical elements. Conventional qualification and reliability need to be modified and expanded in most cases in order to detect new unknown failures. This paper will review four standards that already released or being developed that specifically address the issues on qualification and reliability of assembled packages. Exposures to thermal cycles, monotonic bend test, mechanical shock and drop are covered in these specifications. Finally, mechanical and thermal cycle qualification data generated for MEMS accelerometer will be presented. The MEMS was an element of an inertial measurement unit (IMU) qualified for NASA Mars Exploration Rovers (MERs), Spirit and Opportunity that successfully is currently roaring the Martian surface

  4. 49 CFR 180.603 - Qualification of portable tanks.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Qualification of portable tanks. 180.603 Section... MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Portable Tanks § 180.603 Qualification of portable tanks. (a) Each portable tank used for the transportation of hazardous materials must be an authorized...

  5. Design and Qualification of the AMS-02 Flight Cryocoolers

    NASA Technical Reports Server (NTRS)

    Shirey, Kimberly; Banks,Stuart; Boyle, Rob; Unger, Reuven

    2005-01-01

    Four commercial Sunpower M87N Stirling-cycle cryocoolers will be used to extend the lifetime of the Alpha Magnetic Spectrometer-02 (AMS-02) experiment. The cryocoolers will be mounted to the AMS-02 vacuum case using a structure that will thermally and mechanically decouple the cryocooler from the vacuum case. This paper discusses modifications of the Sunpower M87N cryocooler to make it acceptable for space flight applications and suitable for use on AMS-02. Details of the flight model qualification test program are presented. AMS-02 is a state-of-the-art particle physics detector containing a large superfluid helium-cooled superconducting magnet. Highly sensitive detector plates inside the magnet measure a particle's speed, mass, charge, and direction. The AMS-02 experiment, which will be flown as an attached payload on the International Space Station, will study the properties and origin of cosmic particles and nuclei including antimatter and dark matter. Two engineering model cryocoolers have been under test at NASA Goddard since November 2001. Qualification testing of the engineering model cryocooler bracket assembly including random vibration and thermal vacuum testing was completed at the end of April 2005. The flight cryocoolers were received in December 2003. Acceptance testing of the flight cryocooler bracket assemblies began in May 2005 .

  6. Characterization and calibration of gas sensor systems at ppb level—a versatile test gas generation system

    NASA Astrophysics Data System (ADS)

    Leidinger, Martin; Schultealbert, Caroline; Neu, Julian; Schütze, Andreas; Sauerwald, Tilman

    2018-01-01

    This article presents a test gas generation system designed to generate ppb level gas concentrations from gas cylinders. The focus is on permanent gases and volatile organic compounds (VOCs) for applications like indoor and outdoor air quality monitoring or breath analysis. In the design and the setup of the system, several issues regarding handling of trace gas concentrations have been considered, addressed and tested. This concerns not only the active fluidic components (flow controllers, valves), which have been chosen specifically for the task, but also the design of the fluidic tubing regarding dead volumes and delay times, which have been simulated for the chosen setup. Different tubing materials have been tested for their adsorption/desorption characteristics regarding naphthalene, a highly relevant gas for indoor air quality monitoring, which has generated high gas exchange times in a previous gas mixing system due to long time adsorption/desorption effects. Residual gas contaminations of the system and the selected carrier air supply have been detected and quantified using both an analytical method (GC-MS analysis according to ISO 16000-6) and a metal oxide semiconductor gas sensor, which detected a maximum contamination equivalent to 28 ppb of carbon monoxide. A measurement strategy for suppressing even this contamination has been devised, which allows the system to be used for gas sensor and gas sensor system characterization and calibration in the low ppb concentration range.

  7. Unit Standards Catalogue. Unit Standards and Qualifications Registered on the National Qualifications Framework to March 1994.

    ERIC Educational Resources Information Center

    New Zealand Qualifications Authority, Wellington.

    This booklet includes the latest list of unit standards and qualifications registered on the New Zealand National Qualifications Framework to April 1994. Unit standards registered on the framework can be offered by private and government training establishments, polytechnics, colleges of education, and schools. This list of registered unit…

  8. 5 CFR 319.301 - Qualifications standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Qualifications standards. 319.301 Section... IN SENIOR-LEVEL AND SCIENTIFIC AND PROFESSIONAL POSITIONS Qualifications Requirements § 319.301... in the General Schedule. (c) Standards for scientific and professional positions. (1) Unless the...

  9. 5 CFR 319.301 - Qualifications standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Qualifications standards. 319.301 Section... IN SENIOR-LEVEL AND SCIENTIFIC AND PROFESSIONAL POSITIONS Qualifications Requirements § 319.301... in the General Schedule. (c) Standards for scientific and professional positions. (1) Unless the...

  10. 5 CFR 330.709 - Qualification reviews.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Qualification reviews. 330.709 Section..., SELECTION, AND PLACEMENT (GENERAL) Interagency Career Transition Assistance Plan for Displaced Employees § 330.709 Qualification reviews. Agencies will ensure that a documented, independent second review is...

  11. 48 CFR 253.209 - Contractor qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications. ...

  12. Qualification Procedures for VHSIC/VLSI

    DTIC Science & Technology

    1990-12-01

    alternative approach for qualification of complex microcircuits. To address the technical issues related to a process oriented qualification approach, the...methodology of microcircuit process control to promote the United States to a position of supplying the nighest quality and most reliable...available resources . o Coordinate document reviews with weekly and monthly status reviews on progress. o Summarize results and collate into four basic

  13. 28 CFR 115.402 - Auditor qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Auditor qualifications. 115.402 Section 115.402 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.402 Auditor qualifications. (a) An audit shall be conducted...

  14. 28 CFR 115.402 - Auditor qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Auditor qualifications. 115.402 Section 115.402 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.402 Auditor qualifications. (a) An audit shall be conducted...

  15. 28 CFR 115.402 - Auditor qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Auditor qualifications. 115.402 Section 115.402 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.402 Auditor qualifications. (a) An audit shall be conducted...

  16. 5 CFR 330.609 - Qualification reviews.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Qualification reviews. 330.609 Section..., SELECTION, AND PLACEMENT (GENERAL) Agency Career Transition Assistance Plans (CTAP) for Local Surplus and Displaced Employees § 330.609 Qualification reviews. Agencies will ensure that a documented, independent...

  17. Safety considerations in testing a fuel-rich aeropropulsion gas generator

    NASA Technical Reports Server (NTRS)

    Rollbuhler, R. James; Hulligan, David D.

    1991-01-01

    A catalyst containing reactor is being tested using a fuel-rich mixture of Jet A fuel and hot input air. The reactor product is a gaseous fuel that can be utilized in aeropropulsion gas turbine engines. Because the catalyst material is susceptible to damage from high temperature conditions, fuel-rich operating conditions are attained by introducing the fuel first into an inert gas stream in the reactor and then displacing the inert gas with reaction air. Once a desired fuel-to-air ratio is attained, only limited time is allowed for a catalyst induced reaction to occur; otherwise the inert gas is substituted for the air and the fuel flow is terminated. Because there presently is not a gas turbine combustor in which to burn the reactor product gas, the gas is combusted at the outlet of the test facility flare stack. This technique in operations has worked successfully in over 200 tests.

  18. 49 CFR 180.507 - Qualification of tank cars.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Qualification of tank cars. 180.507 Section 180... MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Tank Cars § 180.507 Qualification of tank cars. (a) Each tank car marked as meeting a “DOT” specification or any other tank car used for the transportation...

  19. 49 CFR 180.507 - Qualification of tank cars.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Qualification of tank cars. 180.507 Section 180... MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Tank Cars § 180.507 Qualification of tank cars. (a) Each tank car marked as meeting a “DOT” specification or any other tank car used for the transportation...

  20. 49 CFR 180.507 - Qualification of tank cars.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Qualification of tank cars. 180.507 Section 180... MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Tank Cars § 180.507 Qualification of tank cars. (a) Each tank car marked as meeting a “DOT” specification or any other tank car used for the transportation...

  1. 49 CFR 180.507 - Qualification of tank cars.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Qualification of tank cars. 180.507 Section 180... MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Tank Cars § 180.507 Qualification of tank cars. (a) Each tank car marked as meeting a “DOT” specification or any other tank car used for the transportation...

  2. 46 CFR 57.05-3 - Limited space qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Limited space qualifications. 57.05-3 Section 57.05-3... Performance Qualifications § 57.05-3 Limited space qualifications. When a welder is to be qualified for welding or torch brazing of piping on board ship in a limited or restricted space, the space restrictions...

  3. 46 CFR 57.05-3 - Limited space qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Limited space qualifications. 57.05-3 Section 57.05-3... Performance Qualifications § 57.05-3 Limited space qualifications. When a welder is to be qualified for welding or torch brazing of piping on board ship in a limited or restricted space, the space restrictions...

  4. 46 CFR 57.05-3 - Limited space qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Limited space qualifications. 57.05-3 Section 57.05-3... Performance Qualifications § 57.05-3 Limited space qualifications. When a welder is to be qualified for welding or torch brazing of piping on board ship in a limited or restricted space, the space restrictions...

  5. 46 CFR 57.05-3 - Limited space qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Limited space qualifications. 57.05-3 Section 57.05-3... Performance Qualifications § 57.05-3 Limited space qualifications. When a welder is to be qualified for welding or torch brazing of piping on board ship in a limited or restricted space, the space restrictions...

  6. Thermal stratification in LH2 tank of cryogenic propulsion stage tested in ISRO facility

    NASA Astrophysics Data System (ADS)

    Xavier, M.; Raj, R. Edwin; Narayanan, V.

    2017-02-01

    Liquid oxygen and hydrogen are used as oxidizer and fuel respectively in cryogenic propulsion system. These liquids are stored in foam insulated tanks of cryogenic propulsion system and are pressurized using warm pressurant gas supplied for tank pressure maintenance during cryogenic engine operation. Heat leak to cryogenic propellant tank causes buoyancy driven liquid stratification resulting in formation of warm liquid stratum at liquid free surface. This warm stratum is further heated by the admission of warm pressurant gas for tank pressurization during engine operation. Since stratified layer temperature has direct bearing on the cavitation free operation of turbo pumps integrated in cryogenic engine, it is necessary to model the thermal stratification for predicting stratified layer temperature and mass of stratified liquid in tank at the end of engine operation. These inputs are required for estimating the minimum pressure to be maintained by tank pressurization system. This paper describes configuration of cryogenic stage for ground qualification test, stage hot test sequence, a thermal model and its results for a foam insulated LH2 tank subjected to heat leak and pressurization with hydrogen gas at 200 K during liquid outflow at 38 lps for engine operation. The above model considers buoyancy flow in free convection boundary layer caused by heat flux from tank wall and energy transfer from warm pressurant gas etc. to predict temperature of liquid stratum and mass of stratified liquid in tank at the end of engine operation in stage qualification tests carried out in ISRO facility.

  7. 21 CFR 211.25 - Personnel qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 4 2014-04-01 2014-04-01 false Personnel qualifications. 211.25 Section 211.25 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS....25 Personnel qualifications. (a) Each person engaged in the manufacture, processing, packing, or...

  8. 21 CFR 211.25 - Personnel qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 4 2013-04-01 2013-04-01 false Personnel qualifications. 211.25 Section 211.25 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS....25 Personnel qualifications. (a) Each person engaged in the manufacture, processing, packing, or...

  9. 21 CFR 211.25 - Personnel qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 4 2012-04-01 2012-04-01 false Personnel qualifications. 211.25 Section 211.25 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS....25 Personnel qualifications. (a) Each person engaged in the manufacture, processing, packing, or...

  10. 34 CFR 300.156 - Personnel qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... children with disabilities. (c) Qualifications for special education teachers. The qualifications described in paragraph (a) of this section must ensure that each person employed as a public school special education teacher in the State who teaches in an elementary school, middle school, or secondary school is...

  11. 9 CFR 2.32 - Personnel qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Personnel qualifications. 2.32 Section 2.32 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Research Facilities § 2.32 Personnel qualifications. (a) It shall be...

  12. 9 CFR 2.32 - Personnel qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Personnel qualifications. 2.32 Section 2.32 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Research Facilities § 2.32 Personnel qualifications. (a) It shall be...

  13. 9 CFR 2.32 - Personnel qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Personnel qualifications. 2.32 Section 2.32 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Research Facilities § 2.32 Personnel qualifications. (a) It shall be...

  14. 9 CFR 2.32 - Personnel qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Personnel qualifications. 2.32 Section 2.32 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Research Facilities § 2.32 Personnel qualifications. (a) It shall be...

  15. 9 CFR 2.32 - Personnel qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Personnel qualifications. 2.32 Section 2.32 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Research Facilities § 2.32 Personnel qualifications. (a) It shall be...

  16. Alloy 690 qualification: Corrosion under prototypic heat flux and temperature conditions. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baum, A.J.

    1995-05-01

    The objective of this program was to perform qualification tests of industrial heats of thermally treated alloy 690 steam generator tubing under heat transfer conditions. Primary emphasis was focused on testing of alternate tube to tubesheet expansion processes. In addition, a background report was written to document the evolution of the alloy 690 process specification and the supporting qualification testing. While the testing was able to produce some localized corrosion of alloy 690 in the tube to tubesheet joint transition regions under highly alkaline conditions, the corrosion rates were between two and three orders of magnitude lower than the comparablemore » rates in mill annealed alloy 600 tubing. The corrosion morphology was a combination of intergranular and general corrosion, rather than the stress corrosion cracking typically found in mill annealed alloy 600 tubing.« less

  17. Integrated gas analyzer for complete monitoring of turbine engine test cells.

    PubMed

    Markham, James R; Bush, Patrick M; Bonzani, Peter J; Scire, James J; Zaccardi, Vincent A; Jalbert, Paul A; Bryant, M Denise; Gardner, Donald G

    2004-01-01

    Fourier transform infrared (FT-IR) spectroscopy is proving to be reliable and economical for the quantification of many gas-phase species during testing and development of gas turbine engines in ground-based facilities such as sea-level test cells and altitude test cells. FT-IR measurement applications include engine-generated exhaust gases, facility air provided as input to engines, and ambient air in and around test cells. Potentially, the traditionally used assembly of many gas-specific single gas analyzers will be eliminated. However, the quest for a single instrument capable of complete gas-phase monitoring at turbine engine test cells has previously suffered since the FT-IR method cannot measure infrared-inactive oxygen molecules, a key operational gas to both air-breathing propulsion systems and test cell personnel. To further the quest, the FT-IR sensor used for the measurements presented in this article was modified by integration of a miniature, solid-state electrochemical oxygen sensor. Embedded in the FT-IR unit at a location near the long-effective-optical-path-length gas sampling cell, the amperometric oxygen sensor provides simultaneous, complementary information to the wealth of spectroscopic data provided by the FT-IR method.

  18. Specification for Qualification and Certification for Entry Level Welders.

    ERIC Educational Resources Information Center

    American Welding Society, Miami, FL.

    This document provides a standard that defines the requirements and program for the American Welding Society to certify entry-level welders. The certification of entry-level welders requires performance qualification and practical knowledge tests that require a minimum of reading, computation, and manual skills to complete. The Entry-Level Welder…

  19. 14 CFR 121.909 - Approval of Advanced Qualification Program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... methodology must incorporate a thorough analysis of the certificate holder's operations, aircraft, line environment and job functions. All AQP qualification and continuing qualification curriculums must integrate.... (ii) Initial job task listing. (iii) Instructional systems development methodology. (iv) Qualification...

  20. Cylinder expansion test and gas gun experiment comparison

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harrier, Danielle

    This is a summer internship presentation by the Hydro Working Group at Los Alamos National Laboratory (LANL) and goes into detail about their cylinder expansion test and gas gun experiment comparison. Specifically, the gas gun experiment is detailed along with applications, the cylinder expansion test is detailed along with applications, there is a comparison of the methods with pros and cons and limitations listed, the summer project is detailed, and future work is talked about.

  1. Implementation plans for the Korean certified tumor registrar qualification system.

    PubMed

    Boo, Yoo-Kyung; Lim, Hyun-Sook; Won, Young-Joo

    2014-01-01

    Cancer registration data is used to understand the nation's cancer burden, and to provide significant baseline data for cancer control efforts, as well as, research on cancer incidence, mortality, survival, and prevalence. A system that approves, assesses, and manages the qualification of specialists, responsible for performing cancer registration, has not been developed in Korea. This study presents ways to implement a certification system designed for the qualification of tumor registrars in Korea. Requirements for implementing a certified tumor registrar qualification system were determined by reviewing the system for establishing qualifications in Korea and the American qualification system via the National Cancer Registrars Association (NCRA). Moreover, a survey was conducted on Korean medical records administrators, who had taken the U.S. Certified Tumor Registrar (CTR) examination, in order to review their opinions regarding these requirements. This study verified the feasibility of a qualification examination based on the opinions of CTR specialists by determining the following: items, and the associated ratings, of the qualifications necessary to register individuals as certified tumor registrars in a private qualification system; status of human resources required for the examination or training processes; plans regarding the organization needed for management, and operation of qualifications, examination standards, subject areas, examination methods, examination qualifications, or education and training programs. The implementation of a certified tumor registrar qualification system will lead to enhanced job competency for specialists and a qualitative improvement of cancer registration data. It will also reliably foster human resources that will lay the groundwork needed to establish scientific and reasonable national cancer management policies.

  2. 30 CFR 36.49 - Tests of exhaust-gas dilution system.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Tests of exhaust-gas dilution system. 36.49..., EVALUATION, AND APPROVAL OF MINING PRODUCTS APPROVAL REQUIREMENTS FOR PERMISSIBLE MOBILE DIESEL-POWERED TRANSPORTATION EQUIPMENT Test Requirements § 36.49 Tests of exhaust-gas dilution system. The performance and...

  3. 30 CFR 36.49 - Tests of exhaust-gas dilution system.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Tests of exhaust-gas dilution system. 36.49..., EVALUATION, AND APPROVAL OF MINING PRODUCTS APPROVAL REQUIREMENTS FOR PERMISSIBLE MOBILE DIESEL-POWERED TRANSPORTATION EQUIPMENT Test Requirements § 36.49 Tests of exhaust-gas dilution system. The performance and...

  4. 9- by 15-Foot Low-Speed Wind Tunnel Acoustic Free Field Evaluation; Part 1: Qualification Report Summary and Part 2: Anechoic Environment Characterization Field Test Report

    NASA Technical Reports Server (NTRS)

    Schmitt, Jeff G.; Stahnke, Brian

    2017-01-01

    This report describes test results from an assessment of the acoustically treated 9x15 Foot Low Speed Wind Tunnel at the NASA Glenn Research Center in Cleveland, Ohio in July of 2016. The tests were conducted in accordance with the recently adopted international standard ISO 26101-2012 on Qualification of Free Field Test Environments. This method involves moving a microphone relative to a source and comparing the sound pressure level versus distance measurements with theoretical inverse square law spreading.

  5. The "Qualifications Business" in Higher Education

    ERIC Educational Resources Information Center

    Berkhout, S. J.

    2006-01-01

    Qualifications have become academic currency. Apart from adding to the success and fluency with which people can move or be transferred from job to job, nationally and internationally, qualifications also serve to shape individuals' perceptions of their own worth because of their impact on their holders' expectations and prospects, as well as…

  6. Gas geochemistry of the Mount Elbert Gas Hydrate Stratigraphic Test Well, Alaska North Slope: implications for gas hydrate exploration in the Arctic

    USGS Publications Warehouse

    Lorenson, T.D.; Collett, T.S.; Hunter, R.B.

    2011-01-01

    Gases were analyzed from well cuttings, core, gas hydrate, and formation tests at the BPXA-DOE-USGS Mount Elbert Gas Hydrate Stratigraphic Test Well, drilled within the Milne Point Unit, Alaska North Slope. The well penetrated a portion of the Eileen gas hydrate deposit, which overlies the more deeply buried Prudhoe Bay, Milne Point, West Sak, and Kuparuk River oil fields. Gas sources in the upper 200 m are predominantly from microbial sources (C1 isotopic compositions ranging from −86.4 to −80.6‰). The C1 isotopic composition becomes progressively enriched from 200 m to the top of the gas hydrate-bearing sands at 600 m. The tested gas hydrates occur in two primary intervals, units D and C, between 614.0 m and 664.7 m, containing a total of 29.3 m of gas hydrate-bearing sands. The hydrocarbon gases in cuttings and core samples from 604 to 914 m are composed of methane with very little ethane. The isotopic composition of the methane carbon ranges from −50.1 to −43.9‰ with several outliers, generally decreasing with depth. Gas samples collected by the Modular Formation Dynamics Testing (MDT) tool in the hydrate-bearing units were similarly composed mainly of methane, with up to 284 ppm ethane. The methane isotopic composition ranged from −48.2 to −48.0‰ in the C sand and from −48.4 to −46.6‰ in the D sand. Methane hydrogen isotopic composition ranged from −238 to −230‰, with slightly more depleted values in the deeper C sand. These results are consistent with the concept that the Eileen gas hydrates contain a mixture of deep-sourced, microbially biodegraded thermogenic gas, with lesser amounts of thermogenic oil-associated gas, and coal gas. Thermal gases are likely sourced from existing oil and gas accumulations that have migrated up-dip and/or up-fault and formed gas hydrate in response to climate cooling with permafrost formation.

  7. Inspection qualification (IQ) and operational qualification (OQ) for a vacuum freeze-dryer--Part I. General discussion.

    PubMed

    Jennings, T A; Scheer, A; Emodi, A; Puderbach, L; King, S; Norton, T

    1996-01-01

    The principle objectives of this paper are (a), to develop the rationale for conducting an inspection qualification (IQ) and operational qualification (OQ) of a vacuum freeze-dryer; (b), to identify the key elements that require verification for completion of the IQ; and (c), to establish the necessary environmental and operational parameters necessary for the OQ of the vacuum freeze-dryer.

  8. Specification for Qualification and Certification for Level II - Advanced Welders.

    ERIC Educational Resources Information Center

    American Welding Society, Miami, FL.

    This document defines the requirements and program for the American Welding Society (AWS) to certify advanced-level welders through an evaluation process entailing performance qualification and practical knowledge tests requiring the use of advanced reading, computational, and manual skills. The following items are included: statement of the…

  9. Design, Build and Qualification of 28 Volt Lithium-Ion battery

    NASA Technical Reports Server (NTRS)

    Curzon, D.; Spurrett, R.; Rao, G.

    2003-01-01

    Contents include the following: 1. GSFC performance specifications requirements. 2. AEA philosophy: battery configuration. 3. AEA battery design: SONY cell, cell screening, 20Ah and 60Ah. 4. Testing: 20Ah battery qualification (environmental); 60Ah battery LEO life cycle. 5. Conclusion.: summary and lessons learned.

  10. 47 CFR 54.415 - Consumer qualification for Link Up.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Consumer qualification for Link Up. 54.415... (CONTINUED) UNIVERSAL SERVICE Universal Service Support for Low-Income Consumers § 54.415 Consumer qualification for Link Up. (a) In a state that mandates state Lifeline support, the consumer qualification...

  11. 46 CFR 57.05-2 - Transfer of performance qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Transfer of performance qualifications. 57.05-2 Section 57.05-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING Performance Qualifications § 57.05-2 Transfer of performance qualifications. (a) The...

  12. 46 CFR 57.05-2 - Transfer of performance qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Transfer of performance qualifications. 57.05-2 Section 57.05-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING Performance Qualifications § 57.05-2 Transfer of performance qualifications. (a) The...

  13. 46 CFR 57.05-2 - Transfer of performance qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Transfer of performance qualifications. 57.05-2 Section 57.05-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING Performance Qualifications § 57.05-2 Transfer of performance qualifications. (a) The...

  14. 46 CFR 57.05-2 - Transfer of performance qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Transfer of performance qualifications. 57.05-2 Section 57.05-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING Performance Qualifications § 57.05-2 Transfer of performance qualifications. (a) The...

  15. 46 CFR 57.05-2 - Transfer of performance qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Transfer of performance qualifications. 57.05-2 Section 57.05-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING Performance Qualifications § 57.05-2 Transfer of performance qualifications. (a) The...

  16. 47 CFR 54.415 - Consumer qualification for Link Up.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Consumer qualification for Link Up. 54.415... (CONTINUED) UNIVERSAL SERVICE Universal Service Support for Low-Income Consumers § 54.415 Consumer qualification for Link Up. (a) In a state that mandates state Lifeline support, the consumer qualification...

  17. The New Heavy Gas Testing Capability in the NASA Langley Transonic Dynamics Tunnel

    NASA Technical Reports Server (NTRS)

    Cole, Stanley R.; Rivera, Jose A., Jr.

    1997-01-01

    The NASA Langley Transonic Dynamics Tunnel (TDT) has provided a unique capability for aeroelastic testing for over thirty-five years. The facility has a rich history of significant contributions to the design of many United States commercial transports and military aircraft. The facility has many features which contribute to its uniqueness for aeroelasticity testing; however, perhaps the most important facility capability is the use of a heavy gas test medium to achieve higher test densities. Higher test medium densities substantially improve model building requirements and therefore simplify the fabrication process for building aeroelastically scaled wind-tunnel models. The heavy gas also provides other testing benefits, including reduction in the power requirements to operate the facility during testing. Unfortunately, the use of the original heavy gas has been curtailed due to environmental concerns. A new gas, referred to as R-134a, has been identified as a suitable replacement for the former TDT heavy gas. The TDT is currently undergoing a facility upgrade to allow testing in R-134a heavy gas. This replacement gas will result in an operational test envelope, model scaling advantages, and general testing capabilities similar to those available with the former TDT heavy gas. As such, the TDT is expected to remain a viable facility for aeroelasticity research and aircraft dynamic clearance testing well into the 21st century. This paper describes the anticipated advantages and facility calibration plans for the new heavy gas and briefly reviews several past test programs that exemplify the possible benefits of heavy gas testing.

  18. 42 CFR 84.93 - Gas flow test; open-circuit apparatus.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Gas flow test; open-circuit apparatus. 84.93...-Contained Breathing Apparatus § 84.93 Gas flow test; open-circuit apparatus. (a) A static-flow test will be performed on all open-circuit apparatus. (b) The flow from the apparatus shall be greater than 200 liters...

  19. 42 CFR 84.93 - Gas flow test; open-circuit apparatus.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Gas flow test; open-circuit apparatus. 84.93...-Contained Breathing Apparatus § 84.93 Gas flow test; open-circuit apparatus. (a) A static-flow test will be performed on all open-circuit apparatus. (b) The flow from the apparatus shall be greater than 200 liters...

  20. On the Functions of a System of Vocational Qualifications

    ERIC Educational Resources Information Center

    Lum, Gerard

    2015-01-01

    While acknowledging that a system of vocational qualifications might be perceived as having any number of possible purposes, this paper identifies three primary functions that any vocational qualification must fulfil by dint of being a vocational qualification. It is argued that current arrangements are unable to fulfil these essential functions…

  1. Specification for Qualification and Certification for Level III - Expert Welders.

    ERIC Educational Resources Information Center

    American Welding Society, Miami, FL.

    This document defines the requirements and program for the American Welding Society to certify expert welders through an evaluation process entailing performance qualification and practical knowledge tests requiring the use of advanced reading, computational, and manual skills. The following items are included: statement of the standard's scope;…

  2. Design, Development, manufacture and qualification of wet-slug all-tantalum capacitors

    NASA Technical Reports Server (NTRS)

    Maher, R. H.

    1977-01-01

    Specifications and qualification tests data are presented for over eleven hundred T3 case all-tantalum capacitors encompassing four ratings. The finalized product has all the advantages of the silver cased wet and is capable of withstanding some reverse potential ac ripple current.

  3. Building the Qualification File of EGNOS with DOORS

    NASA Astrophysics Data System (ADS)

    Fabre, J.

    2008-08-01

    EGNOS, the European Satellite-Based Augmentation System (SBAS) to GPS, is getting to its final deployment and being initially operated towards qualification and certification to reach operational capability by 2008/2009. A very important milestone in the development process is the System Qualification Review (QR). As the verification phase aims at demonstrating that the EGNOS System design meets the applicable requirements, the QR declares the completion of verification activities. The main document to present at QR is a consolidated, consistent and complete Qualification file. The information included shall give confidence to the QR reviewers that the performed qualification activities are completed. Therefore, an important issue for the project team is to focus on synthetic and consistent information, and to make the presentation as clear as possible. Traceability to applicable requirements shall be systematically presented. Moreover, in order to support verification justification, reference to details shall be available, and the reviewer shall have the possibility to link automatically to the documents including this detailed information. In that frame, Thales Alenia Space has implemented a strong support in terms of methodology and tool, to provide to System Engineering and Verification teams a single reference technical database, in which all team members consult the applicable requirements, compliance, justification, design data and record the information necessary to build the final Qualification file. This paper presents the EGNOS context, the Qualification file contents, and the methodology implemented, based on Thales Alenia Space practices and in line with ECSS. Finally, it shows how the Qualification file is built in a DOORS environment.

  4. 14 CFR 60.15 - Initial qualification requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Initial qualification requirements. 60.15 Section 60.15 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.15...

  5. 14 CFR 60.15 - Initial qualification requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Initial qualification requirements. 60.15 Section 60.15 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.15...

  6. 14 CFR 60.7 - Sponsor qualification requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Sponsor qualification requirements. 60.7 Section 60.7 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.7...

  7. 14 CFR 60.7 - Sponsor qualification requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Sponsor qualification requirements. 60.7 Section 60.7 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.7...

  8. 14 CFR 60.7 - Sponsor qualification requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Sponsor qualification requirements. 60.7 Section 60.7 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.7...

  9. 14 CFR 60.15 - Initial qualification requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Initial qualification requirements. 60.15 Section 60.15 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.15...

  10. 14 CFR 60.7 - Sponsor qualification requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Sponsor qualification requirements. 60.7 Section 60.7 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.7...

  11. 14 CFR 60.15 - Initial qualification requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Initial qualification requirements. 60.15 Section 60.15 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.15...

  12. 14 CFR 60.4 - Qualification Performance Standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Qualification Performance Standards. 60.4 Section 60.4 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.4...

  13. 14 CFR 60.4 - Qualification Performance Standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Qualification Performance Standards. 60.4 Section 60.4 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.4...

  14. 14 CFR 60.15 - Initial qualification requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Initial qualification requirements. 60.15 Section 60.15 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.15...

  15. 14 CFR 60.4 - Qualification Performance Standards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Qualification Performance Standards. 60.4 Section 60.4 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.4...

  16. 14 CFR 60.4 - Qualification Performance Standards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Qualification Performance Standards. 60.4 Section 60.4 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.4...

  17. 14 CFR 60.4 - Qualification Performance Standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Qualification Performance Standards. 60.4 Section 60.4 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.4...

  18. 48 CFR 1437.7001 - Contractor qualification requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor qualification requirements. 1437.7001 Section 1437.7001 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... Contractor qualification requirements. (a) Prior to award of a contract for real property appraisal services...

  19. Thermal Analysis and Testing of Fastrac Gas Generator Design

    NASA Technical Reports Server (NTRS)

    Nguyen, H.

    1998-01-01

    The Fastrac Engine is being developed by the Marshall Space Flight Center (MSFC) to help meet the goal of substantially reducing the cost of access to space. This engine relies on a simple gas-generator cycle, which burns a small amount of RP-1 and oxygen to provide gas to drive the turbine and then exhausts the spent fuel. The Fastrac program envisions a combination of analysis, design and hot-fire evaluation testing. This paper provides the supporting thermal analysis of the gas generator design. In order to ensure that the design objectives were met, the evaluation tests have started on a component level and a total of 15 tests of different durations were completed to date at MSFC. The correlated thermal model results will also be compared against hot-fire thermocouple data gathered.

  20. Instructions for Plastic Encapsulated Microcircuit(PEM) Selection, Screening and Qualification.

    NASA Technical Reports Server (NTRS)

    King, Terry; Teverovsky, Alexander; Leidecker, Henning

    2002-01-01

    The use of Plastic Encapsulated Microcircuits (PEMs) is permitted on NASA Goddard Space Flight Center (GSFC) spaceflight applications, provided each use is thoroughly evaluated for thermal, mechanical, and radiation implications of the specific application and found to meet mission requirements. PEMs shall be selected for their functional advantage and availability, not for cost saving; the steps necessary to ensure reliability usually negate any initial apparent cost advantage. A PEM shall not be substituted for a form, fit and functional equivalent, high reliability, hermetic device in spaceflight applications. Due to the rapid change in wafer-level designs typical of commercial parts and the unknown traceability between packaging lots and wafer lots, lot specific testing is required for PEMs, unless specifically excepted by the Mission Assurance Requirements (MAR) for the project. Lot specific qualification, screening, radiation hardness assurance analysis and/or testing, shall be consistent with the required reliability level as defined in the MAR. Developers proposing to use PEMs shall address the following items in their Performance Assurance Implementation Plan: source selection (manufacturers and distributors), storage conditions for all stages of use, packing, shipping and handling, electrostatic discharge (ESD), screening and qualification testing, derating, radiation hardness assurance, test house selection and control, data collection and retention.

  1. Impact of the Europeanisation of Education: Qualifications Frameworks in Europe

    ERIC Educational Resources Information Center

    Mikulec, Borut

    2017-01-01

    This article examines the influence of the European qualifications framework--a key European lifelong learning policy instrument for improving employability, comparability and mobility in the European educational space--on the establishment of national qualifications frameworks in Europe. The European qualifications framework and national…

  2. Qualification Testing of Solid Rocket Booster Diagonal Strut Restraint Cable Assembly Part Number 10176-0031-102/103

    NASA Technical Reports Server (NTRS)

    Malone, T. W.

    2006-01-01

    This Technical Memorandum presents qualification test results for solid rocket booster diagonal strut restraint cable part number 101276-00313-102/103. During flight this assembly is exposed to a range of temperatures. MIL-W-83420 shows the breaking strength of the cable as 798 kg (1,760 lb) at room temperature but does not define cable strength at the maximum temperature to which the cable is exposed during the first 2 min of flight; 669 C (1,236 F). The cable, which can be built from different corrosion resistant steel alloys, may also vary in its chemical, physical, and mechanical properties at temperature. Negative margins of safety were produced by analysis of the cable at temperature using standard knockdown factors. However, MSFC-HDBK-5 allows the use of a less conservative safety factor of 1.4 and knockdown factors verified by testing. Test results allowed a calculated knockdown factor of 0.1892 to be determined for the restraint cables, which provides a minimum breaking strength of 151 kg (333 lb) at 677 C (1,250 F) when combined with the minimum breaking strength of 0.317-cm (0.125- or 1/8-in) diameter, type 1 composition rope.

  3. Qualification of computerized monitoring systems in a cell therapy facility compliant with the good manufacturing practices.

    PubMed

    Del Mazo-Barbara, Anna; Mirabel, Clémentine; Nieto, Valentín; Reyes, Blanca; García-López, Joan; Oliver-Vila, Irene; Vives, Joaquim

    2016-09-01

    Computerized systems (CS) are essential in the development and manufacture of cell-based medicines and must comply with good manufacturing practice, thus pushing academic developers to implement methods that are typically found within pharmaceutical industry environments. Qualitative and quantitative risk analyses were performed by Ishikawa and Failure Mode and Effects Analysis, respectively. A process for qualification of a CS that keeps track of environmental conditions was designed and executed. The simplicity of the Ishikawa analysis permitted to identify critical parameters that were subsequently quantified by Failure Mode Effects Analysis, resulting in a list of test included in the qualification protocols. The approach presented here contributes to simplify and streamline the qualification of CS in compliance with pharmaceutical quality standards.

  4. 45 CFR 1306.21 - Staff qualification requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Staff qualification requirements. 1306.21 Section 1306.21 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT... Requirements § 1306.21 Staff qualification requirements. Head Start programs must comply with section 648A of...

  5. 45 CFR 1306.21 - Staff qualification requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Staff qualification requirements. 1306.21 Section 1306.21 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT... Requirements § 1306.21 Staff qualification requirements. Head Start programs must comply with section 648A of...

  6. 45 CFR 1306.21 - Staff qualification requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Staff qualification requirements. 1306.21 Section 1306.21 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT... Requirements § 1306.21 Staff qualification requirements. Head Start programs must comply with section 648A of...

  7. 45 CFR 1306.21 - Staff qualification requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Staff qualification requirements. 1306.21 Section 1306.21 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT... Requirements § 1306.21 Staff qualification requirements. Head Start programs must comply with section 648A of...

  8. 45 CFR 1306.21 - Staff qualification requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Staff qualification requirements. 1306.21 Section 1306.21 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT... Requirements § 1306.21 Staff qualification requirements. Head Start programs must comply with section 648A of...

  9. Capability of the Gas Analysis and Testing Laboratory at the NASA Johnson Space Center

    NASA Technical Reports Server (NTRS)

    Broerman, Craig; Jimenez, Javier; Sweterlitsch, Jeff

    2012-01-01

    The Gas Analysis and Testing Laboratory is an integral part of the testing performed at the NASA Johnson Space Center. The Gas Analysis and Testing Laboratory is a high performance laboratory providing real time analytical instruments to support manned and unmanned testing. The lab utilizes precision gas chromatographs, gas analyzers and spectrophotometers to support the technology development programs within the NASA community. The Gas Analysis and Testing Laboratory works with a wide variety of customers and provides engineering support for user-specified applications in compressed gas, chemical analysis, general and research laboratory.

  10. Capability of the Gas Analysis and Testing Laboratory at the NASA Johnson Space Center

    NASA Technical Reports Server (NTRS)

    Broerman, Craig; Jimenez, Javier; Sweterlitsch, Jeff

    2011-01-01

    The Gas Analysis and Testing Laboratory is an integral part of the testing performed at the NASA Johnson Space Center. The Gas Analysis and Testing Laboratory is a high performance laboratory providing real time analytical instruments to support manned and unmanned testing. The lab utilizes precision gas chromatographs, gas analyzers and spectrophotometers to support the technology development programs within the NASA community. The Gas Analysis and Testing Laboratory works with a wide variety of customers and provides engineering support for user-specified applications in compressed gas, chemical analysis, general and research laboratory

  11. Ratio of produced gas to produced water from DOE's EDNA Delcambre No. 1 geopressured-geothermal aquifer gas well test

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rogers, L.A.; Randolph, P.L.

    1979-01-01

    A paper presented by the Institute of Gas Technology (IGT) at the Third Geopressured-Geothermal Energy Conference hypothesized that the high ratio of produced gas to produced water from the No. 1 sand in the Edna Delcambre No. 1 well was due to free gas trapped in pores by imbibition over geological time. This hypothesis was examined in relation to preliminary test data which reported only average gas to water ratios over the roughly 2-day steps in flow rate. Subsequent public release of detailed test data revealed substantial departures from the previously reported computer simulation results. Also, data now in themore » public domain reveal the existence of a gas cap on the aquifier tested. This paper describes IGT's efforts to match the observed gas/water production with computer simulation. Two models for the occurrence and production of gas in excess of that dissolved in the brine have been used. One model considers the gas to be dispersed in pores by imbibition, and the other model considers the gas as a nearby free gas cap above the aquifier. The studies revealed that the dispersed gas model characteristically gave the wrong shape to plots of gas production on the gas/water ratio plots such that no reasonable match to the flow data could be achieved. The free gas cap model gave a characteristically better shape to the production plots and could provide an approximate fit to the data of the edge of the free gas cap is only about 400 feet from the well.Because the geological structure maps indicate the free gas cap to be several thousand feet away and the computer simulation results match the distance to the nearby Delcambre Nos. 4 and 4A wells, it appears that the source of the excess free gas in the test of the No. 1 sand may be from these nearby wells. The gas source is probably a separate gas zone and is brought into contact with the No. 1 sand via a conduit around the No. 4 well.« less

  12. Anechoic chamber qualification at ultrasonic frequencies

    NASA Astrophysics Data System (ADS)

    Jenny, Trevor; Anderson, Brian

    2010-10-01

    Qualifying an anechoic chamber for frequencies that extend into the ultrasonic range is necessary for research work involving airborne ultrasonic sound. For example, an anechoic chamber allows for measurements of the direct sound radiated by an object without reflections from walls. The ANSI S12.55/ISO 3745 standard which covers anechoic chamber qualification does not extend into the ultrasonic frequency range, nor have others discussed this frequency range in the literature. An increasing number of technologies are employing ultrasound; hence the need to develop facilities to conduct basic research studies on airborne ultrasound. This presentation will discuss the challenges associated with chamber qualification and present the results for qualification of a chamber at Brigham Young University. [This work has been funded by the Los Alamos National Laboratory

  13. Launch Vehicle Flight Report - Nasa Project Apollo Little Joe 2 Qualification Test Vehicle 12-50-1

    NASA Technical Reports Server (NTRS)

    1963-01-01

    The Little Joe II Qualification Test Vehicle, Model 12-50-1, was launched from Army Launch Area 3 {ALA-3) at White Sands Missile Range, New Mexico, on 28 August 1963. This was the first launch of this class of boosters. The Little Joe II Launch Vehicle was designed as a test vehicle for boosting payloads into flight. For the Apollo Program, its mission is to serve as a launch vehicle for flight testing of the Apollo spacecraft. Accomplishment of this mission requires that the vehicle be capable of boosting the Apollo payload to parameters ranging from high dynamic pressures at low altitude to very high altitude flight. The fixed-fin 12-50 version was designed to accomplish the low-altitude parameter. The 12-51 version incorporates an attitude control system to accomplish the high altitude mission. This launch was designed to demonstrate the Little Joe II capability of meeting the high dynamic pressure parameter for the Apollo Program. For this test, a boiler-plate version of the Apollo capsule, service module and escape tower were attached to the launch vehicle to simulate weight, center of gravity and aerodynamic shape of the Apollo configuration. No attempt was made to separate the payload in flight. The test was conducted in compliance with Project Apollo Flight Mission Directive for QTV-1, NASA-MSC, dated 3 June 1963, under authority of NASA Contract NAS 9-492,

  14. Towards a programme of testing and qualification for structural and plasma-facing materials in ‘fusion neutron’ environments

    NASA Astrophysics Data System (ADS)

    Stork, D.; Heidinger, R.; Muroga, T.; Zinkle, S. J.; Moeslang, A.; Porton, M.; Boutard, J.-L.; Gonzalez, S.; Ibarra, A.

    2017-09-01

    Materials damage by 14.1MeV neutrons from deuterium-tritium (D-T) fusion reactions can only be characterised definitively by subjecting a relevant configuration of test materials to high-intensity ‘fusion-neutron spectrum sources’, i.e. those simulating closely D-T fusion-neutron spectra. This provides major challenges to programmes to design and construct a demonstration fusion reactor prior to having a large-scale, high-intensity source of such neutrons. In this paper, we discuss the different aspects related to these ‘relevant configuration’ tests, including: • generic issues in materials qualification/validation, comparing safety requirements against those of investment protection; • lessons learned from the fission programme, enabling a reduced fusion materials testing programme; • the use and limitations of presently available possible irradiation sources to optimise a fusion neutron testing program including fission-neutron irradiation of isotopically and chemically tailored steels, ion damage by high-energy helium ions and self-ion beams, or irradiation studies with neutron sources of non-fusion spectra; and • the different potential sources of simulated fusion neutron spectra and the choice using stripping reactions from deuterium-beam ions incident on light-element targets.

  15. James Webb Space Telescope (JWST) Integrated Science Instruments Module (ISIM) Electronics Compartment (IEC) Conformal Shields Composite Bond Structure Qualification Test Method

    NASA Technical Reports Server (NTRS)

    Yew, Calinda; Stephens, Matt

    2015-01-01

    The JWST IEC conformal shields are mounted onto a composite frame structure that must undergo qualification testing to satisfy mission assurance requirements. The composite frame segments are bonded together at the joints using epoxy, EA 9394. The development of a test method to verify the integrity of the bonded structure at its operating environment introduces challenges in terms of requirements definition and the attainment of success criteria. Even though protoflight thermal requirements were not achieved, the first attempt in exposing the structure to cryogenic operating conditions in a thermal vacuum environment resulted in approximately 1 bonded joints failure during mechanical pull tests performed at 1.25 times the flight loads. Failure analysis concluded that the failure mode was due to adhesive cracks that formed and propagated along stress concentrated fillets as a result of poor bond squeeze-out control during fabrication. Bond repairs were made and the structures successfully re-tested with an improved LN2 immersion test method to achieve protoflight thermal requirements.

  16. 10 CFR 1046.11 - Medical and physical fitness qualification standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Medical and physical fitness qualification standards. 1046... INTERESTS Protective Force Personnel § 1046.11 Medical and physical fitness qualification standards. (a... personnel any individual who fails to meet the applicable medical and physical fitness qualification...

  17. 10 CFR 1046.11 - Medical and physical fitness qualification standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Medical and physical fitness qualification standards. 1046... INTERESTS Protective Force Personnel § 1046.11 Medical and physical fitness qualification standards. (a... personnel any individual who fails to meet the applicable medical and physical fitness qualification...

  18. 10 CFR 1046.11 - Medical and physical fitness qualification standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Medical and physical fitness qualification standards. 1046... INTERESTS Protective Force Personnel § 1046.11 Medical and physical fitness qualification standards. (a... personnel any individual who fails to meet the applicable medical and physical fitness qualification...

  19. 33 CFR 154.2010 - Qualifications for acceptance as a certifying entity.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... qualifications: (a) The ability to review and evaluate design drawings and failure analyses for compliance to... incorporated by reference; (c) The ability to monitor and evaluate test procedures and results for compliance with the operational requirements of this subpart; (d) The ability to perform inspections and observe...

  20. The European Qualifications Framework: A Technical Critique

    ERIC Educational Resources Information Center

    Lester, Stan

    2015-01-01

    The European Qualifications Framework (EQF) was introduced in 2008 as a "meta-framework" or common reference point for national qualifications frameworks in Europe, a function for which, with some caveats, it has been pragmatically successful. It has also been used with variable success to support the development or referencing of…

  1. 30 CFR 880.11 - Qualifications of projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ABANDONED MINE LAND RECLAMATION MINE FIRE CONTROL § 880.11 Qualifications of projects. The purpose of all projects is to prevent injury and loss of life, protect public health, conserve natural resources, or... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Qualifications of projects. 880.11 Section 880...

  2. 46 CFR 68.37 - Cessation of qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... DOCUMENTATION OF VESSELS: EXCEPTIONS TO COASTWISE QUALIFICATION Documentation of Certain Vessels for Oil Spill Cleanup § 68.37 Cessation of qualifications. (a) If the vessel is owned by a not-for-profit oil spill... change. The not-for-profit oil spill response cooperative shall report the change in writing to the...

  3. 46 CFR 68.37 - Cessation of qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... DOCUMENTATION OF VESSELS: EXCEPTIONS TO COASTWISE QUALIFICATION Documentation of Certain Vessels for Oil Spill Cleanup § 68.37 Cessation of qualifications. (a) If the vessel is owned by a not-for-profit oil spill... change. The not-for-profit oil spill response cooperative shall report the change in writing to the...

  4. 46 CFR 68.37 - Cessation of qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... DOCUMENTATION OF VESSELS: EXCEPTIONS TO COASTWISE QUALIFICATION Documentation of Certain Vessels for Oil Spill Cleanup § 68.37 Cessation of qualifications. (a) If the vessel is owned by a not-for-profit oil spill... change. The not-for-profit oil spill response cooperative shall report the change in writing to the...

  5. In situ gas treatment technology demonstration test plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thornton, E.C.; Miller, R.D.

    1996-02-16

    This document defines the objectives and requirements associated with undertaking a field demonstration of an in situ gas treatment appoach to remediation chromate-contaminated soil. The major tasks presented in this plan include the design and development of the surface gas treatment system, performance of permitting activities, and completion of site preparation and field testing activities.

  6. 42 CFR 84.94 - Gas flow test; closed-circuit apparatus.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Gas flow test; closed-circuit apparatus. 84.94...-Contained Breathing Apparatus § 84.94 Gas flow test; closed-circuit apparatus. (a) Where oxygen is supplied... rated service time of the apparatus. (b) Where constant flow is used in conjunction with demand flow...

  7. 42 CFR 84.94 - Gas flow test; closed-circuit apparatus.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Gas flow test; closed-circuit apparatus. 84.94...-Contained Breathing Apparatus § 84.94 Gas flow test; closed-circuit apparatus. (a) Where oxygen is supplied... rated service time of the apparatus. (b) Where constant flow is used in conjunction with demand flow...

  8. Response measurement by laser Doppler vibrometry in vibration qualification tests with non-Gaussian random excitation

    NASA Astrophysics Data System (ADS)

    Troncossi, M.; Di Sante, R.; Rivola, A.

    2016-10-01

    In the field of vibration qualification testing, random excitations are typically imposed on the tested system in terms of a power spectral density (PSD) profile. This is the one of the most popular ways to control the shaker or slip table for durability tests. However, these excitations (and the corresponding system responses) exhibit a Gaussian probability distribution, whereas not all real-life excitations are Gaussian, causing the response to be also non-Gaussian. In order to introduce non-Gaussian peaks, a further parameter, i.e., kurtosis, has to be controlled in addition to the PSD. However, depending on the specimen behaviour and input signal characteristics, the use of non-Gaussian excitations with high kurtosis and a given PSD does not automatically imply a non-Gaussian stress response. For an experimental investigation of these coupled features, suitable measurement methods need to be developed in order to estimate the stress amplitude response at critical failure locations and consequently evaluate the input signals most representative for real-life, non-Gaussian excitations. In this paper, a simple test rig with a notched cantilevered specimen was developed to measure the response and examine the kurtosis values in the case of stationary Gaussian, stationary non-Gaussian, and burst non-Gaussian excitation signals. The laser Doppler vibrometry technique was used in this type of test for the first time, in order to estimate the specimen stress amplitude response as proportional to the differential displacement measured at the notch section ends. A method based on the use of measurements using accelerometers to correct for the occasional signal dropouts occurring during the experiment is described. The results demonstrate the ability of the test procedure to evaluate the output signal features and therefore to select the most appropriate input signal for the fatigue test.

  9. SRS H1616 hydride transport vessel qualification report

    DOT National Transportation Integrated Search

    1998-12-01

    This report serves as the design qualification basis for both transport and facility use. headings identify report sections as containing qualification information for transport use, facility use, or both transport and facility use. This report demon...

  10. Characterization of Gas Transport Properties of Fractured Rocks By Borehole and Chamber Tests.

    NASA Astrophysics Data System (ADS)

    Shimo, M.; Shimaya, S.; Maejima, T.

    2014-12-01

    Gas transport characteristics of fractured rocks is a great concern to variety of engineering applications such as underground storage of LPG, nuclear waste disposal, CCS and gas flooding in the oil field. Besides absolute permeability, relative permeability and capillary pressure as a function of water saturation have direct influences to the results of two phase flow simulation. However, number of the reported gas flow tests for fractured rocks are limited, therefore, the applicability of the conventional two-phase flow functions used for porous media, such as Mualem-van Genuchten model, to prediction of the gas transport in the fractured rock mass are not well understood. The authors conducted the two types of in-situ tests, with different scales, a borehole gas-injection test and a chamber gas-injection test in fractured granitic rock. These tests were conducted in the Cretaceous granitic rocks at the Namikata underground LPG storage cavern construction site in Ehime Prefecture in Japan, preceding to the cavern scale gas-tightness test. A borehole injection test was conducted using vertical and sub-vertical boreholes drilled from the water injection tunnel nearly at the depth of the top of the cavern, EL-150m. A new type downhole gas injection equipment that is capable to create a small 'cavern' within a borehole was developed. After performing a series of preliminary tests to investigate the hydraulic conductivity and gas-tightness, i.e. threshold pressure, gas injection tests were conducted under different gas pressure. Fig.1 shows an example of the test results From a chamber test using a air pressurizing chamber with volume of approximately166m3, the gas-tightness was confirmed within the uncertainty of 22Pa under the storage pressure of 0.7MPa, however, significant air leakage occurred possibly through an open fracture intersecting the chamber just after cavern pressure exceeds the initial hydrostatic pressure at the ceiling level of the chamber. Anomalies

  11. Intermediate load modules for test and evaluation

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Photovoltaic modules were tested for qualification. Tests involved the following: (1) delivery of 20 solar cells for use as reference cells; (2) module documentation and inspection plans specifying the 10 Group I modules; (3) design review of module documentation from Group I modules; (4) revise module documentation to overcome any problems of deficiencies associated with the Group I modules; (5) delivery of 10 Group II modules built to revised specifications; (6) testing of Group II modules to the criteria as outlined in qualification specification. It is found that the solarvolt MSP43E40B satisfies the design criteria of qualification specification for intermediate load modules. Design changes were made in the Group I modules to overcome the deficiencies which allowed Group II modules to pass the qualification tests.

  12. Qualifications Frameworks in Africa: A Critical Reflection

    ERIC Educational Resources Information Center

    Higgs, P.; Keevy, J.

    2009-01-01

    Today there is an accelerating trend towards qualifications frameworks as an instrument to develop, classify and recognise formal learning across the African continent, as is also the case across most of Europe, Australasia and the Asia-Pacific region. As more and more countries and regions across the world develop qualifications frameworks to…

  13. SULTAN measurement and qualification: ITER-US-LLNL-NMARTOVETSKY- 092008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martovetsky, N N

    2006-09-21

    Measuring the characteristics of full scale ITER CICC at SULTAN is the critical qualification test. If volt-ampere characteristic (VAC) or volt-temperature characteristic (VTC) are distorted, the criterion of 10 uV/m may not be a valid criterion to judge the conductor performance. Only measurements with a clear absence or low signals from the current distribution should be considered as quantitatively representative, although in some obvious circumstances one can judge if a conductor will meet or fail ITER requirements. SULTAN full scale ITER CICC testing should be done with all measures taken to ensure uniform current redistribution. A full removal of Crmore » plating in the joint area and complete solder filling of the joints (with provision of the central channel for helium flow) should be mandatory for DC qualification samples for ITER. Also, T and I should be increased slowly that an equilibrium could be established for accurate measurement of Tcs, Ic and N. It is also desirable to go up in down in current and/or temperature (within stable range) to make sure that the equilibrium is reached.« less

  14. 49 CFR 214.347 - Training and qualification for lone workers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Training and qualification for lone workers. 214... § 214.347 Training and qualification for lone workers. Each lone worker shall be trained and qualified... training and qualification for lone workers shall include, as a minimum, consideration of the following...

  15. 49 CFR 214.347 - Training and qualification for lone workers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Training and qualification for lone workers. 214... § 214.347 Training and qualification for lone workers. Each lone worker shall be trained and qualified... training and qualification for lone workers shall include, as a minimum, consideration of the following...

  16. Qualification and cryogenic performance of cryomodule components at CEBAF

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heckman, J.; Macha, K.; Fischer, J.

    1996-12-31

    At CEBAF an electron beam is accelerated by superconducting resonant niobium cavities which are operated submerged in superfluid helium. The accelerator has 42 1/4 cryomodules, each containing eight cavities. The qualification and design of components for the cryomodules under went stringent testing and evaluation for acceptance. Indium wire seals are used between the cavity and helium vessel interface to make a superfluid helium leak tight seal. Each cavity is equipped with a mechanical tuner assembly designed to stretch and compress the cavities. Two rotary feedthroughs are used to operate each mechanical tuner assembly. Ceramic feedthroughs not designed for super-fluid weremore » qualified for tuner and cryogenic instrumentation. To ensure long term integrity of the machine special attention is required for material specifications and machine processes. The following is to share the qualification methods, design and performance of the cryogenic cryomodule components.« less

  17. 48 CFR 9.204 - Responsibilities for establishment of a qualification requirement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... requirements. If active competition on anticipated future qualification requirements is likely to be fewer than... establishing the production, quality control, or other system to be tested and evaluated) for a small business... additional qualified sources or products are likely to result in cost savings from increased competition for...

  18. Findings from the Supersonic Qualification Program of the Mars Science Laboratory Parachute System

    NASA Technical Reports Server (NTRS)

    Sengupta, Anita; Steltzner, Adam; Witkowski, Allen; Candler, Graham; Pantano, Carlos

    2009-01-01

    In 2012, the Mars Science Laboratory Mission (MSL) will deploy NASA's largest extra-terrestrial parachute, a technology integral to the safe landing of its advanced robotic explorer on the surface. The supersonic parachute system is a mortar deployed 21.5 m disk-gap-band (DGB) parachute, identical in geometric scaling to the Viking era DGB parachutes of the 1970's. The MSL parachute deployment conditions are Mach 2.3 at a dynamic pressure of 750 Pa. The Viking Balloon Launched Decelerator Test (BLDT) successfully demonstrated a maximum of 700 Pa at Mach 2.2 for a 16.1 m DGB parachute in its AV4 flight. All previous Mars deployments have derived their supersonic qualification from the Viking BLDT test series, preventing the need for full scale high altitude supersonic testing. The qualification programs for Mars Pathfinder, Mars Exploration Rover, and Phoenix Scout Missions were all limited to subsonic structural qualification, with supersonic performance and survivability bounded by the BLDT qualification. The MSL parachute, at the edge of the supersonic heritage deployment space and 33% larger than the Viking parachute, accepts a certain degree of risk without addressing the supersonic environment in which it will deploy. In addition, MSL will spend up to 10 seconds above Mach 1.5, an aerodynamic regime that is associated with a known parachute instability characterized by significant canopy projected area fluctuation and dynamic drag variation. This aerodynamic instability, referred to as "area oscillations" by the parachute community has drag performance, inflation stability, and structural implications, introducing risk to mission success if not quantified for the MSL parachute system. To minimize this risk and as an alternative to a prohibitively expensive high altitude test program, a multi-phase qualification program using computation simulation validated by subscale test was developed and implemented for MSL. The first phase consisted of 2% of fullscale

  19. Qualification of Electrical Ground Support Equipment for New Space Programs

    NASA Technical Reports Server (NTRS)

    SotoToro, Felix A.; Vu, Bruce T.; Hamilton, Mark S.

    2011-01-01

    With the Space Shuttle program coming to an end, the National Aeronautics and Space Administration (NASA) is moving to a new space flight program that will allow expeditions beyond low earth orbit. The space vehicles required to comply with these missions will be carrying heavy payloads. This implies that the Earth departure stage capabilities must be of higher magnitudes, given the current propulsion technology. The engineering design of the new flight hardware comes with some structural, thermal, propulsion and other subsystems' challenges. Meanwhile, the necessary ground support equipment (GSE) used to test, validate, verify and process the flight hardware must withstand the new program specifications. This paper intends to provide the qualification considerations during implementation of new electrical GSE for space programs. A team of engineers was formed to embark on this task, and facilitate the logistics process and ensure that the electrical, mechanical and fluids subsystems conduct the proper level of testing. Ultimately, each subsystem must certify that each piece of ground support equipment used in the field is capable of withstanding the strenuous vibration, acoustics, environmental, thermal and Electromagnetic Interference (EMf) levels experienced during pre-launch, launch and post-launch activities. The benefits of capturing and sharing these findings will provide technical, cost savings and schedule impacts infon11ation to both the technical and management community. Keywords: Qualification; Testing; Ground Support Equipment; Electromagnetic Interference Testing; Vibration Testing; Acoustic Testing; Power Spectral Density.

  20. Implementing a National Qualifications Framework in Lithuania

    ERIC Educational Resources Information Center

    Tutlys, Vidmantas; Spudyte, Irma

    2011-01-01

    The design of the national qualifications framework (NQF) in Lithuania started in 2006. The NQF was officially approved by the government decree in May 2010. This article explores the influence of the processes of institutional change on the reform of the national system of qualifications in Lithuania through the implementation of the NQF, looking…

  1. Reliability Evaluation of Concentrator Photovoltaic Modules per IEC Qualification Specifications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tamizhmani, Govindasamy

    2012-12-05

    This project is related to the qualification testing of new generation CPV (concentrator photovoltaics) modules at lower testing costs and lower turnaround time. In this project, the first testing program was completed for two CPV manufacturers, the second testing program was completed for two manufacturers at 65% of the actual testing cost and at less than 3 months of testing turnaround time and the third testing program was completed for two manufacturers at 65% of the actual testing cost and at less than 3 months of testing turnaround time. Due to their financial situation and restructuring, Amonix (one of themore » CPV manufacturers) intermittently terminated the test programs.« less

  2. LEAK AND GAS PERMEABILITY TESTING DURING SOIL-GAS SAMPLING AT HAL'S CHEVRON LUST SITE IN GREEN RIVER, UTAH

    EPA Science Inventory

    The results of gas permeability and leak testing during active soil-gas sampling at Hal’s Chevron LUST Site in Green River, Utah are presented. This study was conducted to support development of a passive soil-gas sampling method. Gas mixtures containing helium and methane were...

  3. High-Flux, High-Temperature Thermal Vacuum Qualification Testing of a Solar Receiver Aperture Shield

    NASA Technical Reports Server (NTRS)

    Kerslake, Thomas W.; Mason, Lee S.; Strumpf, Hal J.

    1997-01-01

    equilibrium temperature of 2072 K was achieved. The aperture shield sustained no visible damage as a result of the exposures. This paper describes the aperture shield thermal-vacuum qualification test program including the test article, test facility, procedures, data collection, test success criteria, results and conclusions.

  4. Evaluation of long-term gas hydrate production testing locations on the Alaska north slope

    USGS Publications Warehouse

    Collett, T.S.; Boswell, R.; Lee, M.W.; Anderson, B.J.; Rose, K.; Lewis, K.A.

    2011-01-01

    The results of short duration formation tests in northern Alaska and Canada have further documented the energy resource potential of gas hydrates and justified the need for long-term gas hydrate production testing. Additional data acquisition and long-term production testing could improve the understanding of the response of naturally-occurring gas hydrate to depressurization-induced or thermal-, chemical-, and/or mechanical-stimulated dissociation of gas hydrate into producible gas. The Eileen gas hydrate accumulation located in the Greater Prudhoe Bay area in northern Alaska has become a focal point for gas hydrate geologic and production studies. BP Exploration (Alaska) Incorporated and ConocoPhillips have each established research partnerships with U.S. Department of Energy to assess the production potential of gas hydrates in northern Alaska. A critical goal of these efforts is to identify the most suitable site for production testing. A total of seven potential locations in the Prudhoe Bay, Kuparuk, and Milne Point production units were identified and assessed relative to their suitability as a long-term gas hydrate production test site. The test site assessment criteria included the analysis of the geologic risk associated with encountering reservoirs for gas hydrate testing. The site selection process also dealt with the assessment of the operational/logistical risk associated with each of the potential test sites. From this review, a site in the Prudhoe Bay production unit was determined to be the best location for extended gas hydrate production testing. The work presented in this report identifies the key features of the potential test site in the Greater Prudhoe Bay area, and provides new information on the nature of gas hydrate occurrence and potential impact of production testing on existing infrastructure at the most favorable sites. These data were obtained from well log analysis, geological correlation and mapping, and numerical simulation

  5. Evaluation of long-term gas hydrate production testing locations on the Alaska North Slope

    USGS Publications Warehouse

    Collett, Timothy; Boswell, Ray; Lee, Myung W.; Anderson, Brian J.; Rose, Kelly K.; Lewis, Kristen A.

    2011-01-01

    The results of short duration formation tests in northern Alaska and Canada have further documented the energy resource potential of gas hydrates and justified the need for long-term gas hydrate production testing. Additional data acquisition and long-term production testing could improve the understanding of the response of naturally-occurring gas hydrate to depressurization-induced or thermal-, chemical-, and/or mechanical-stimulated dissociation of gas hydrate into producible gas. The Eileen gas hydrate accumulation located in the Greater Prudhoe Bay area in northern Alaska has become a focal point for gas hydrate geologic and production studies. BP Exploration (Alaska) Incorporated and ConocoPhillips have each established research partnerships with U.S. Department of Energy to assess the production potential of gas hydrates in northern Alaska. A critical goal of these efforts is to identify the most suitable site for production testing. A total of seven potential locations in the Prudhoe Bay, Kuparuk, and Milne Point production units were identified and assessed relative to their suitability as a long-term gas hydrate production test site. The test site assessment criteria included the analysis of the geologic risk associated with encountering reservoirs for gas hydrate testing. The site selection process also dealt with the assessment of the operational/logistical risk associated with each of the potential test sites. From this review, a site in the Prudhoe Bay production unit was determined to be the best location for extended gas hydrate production testing. The work presented in this report identifies the key features of the potential test site in the Greater Prudhoe Bay area, and provides new information on the nature of gas hydrate occurrence and potential impact of production testing on existing infrastructure at the most favorable sites. These data were obtained from well log analysis, geological correlation and mapping, and numerical simulation.

  6. Job Outcomes among Korean Graduates with Vocational Qualifications

    ERIC Educational Resources Information Center

    Lee, Young-Min; Cho, Sung-Eun

    2017-01-01

    Purpose: The purpose of this paper is to ascertain the status of recent Korean four-year college students' acquisition of vocational qualification certificates (hereinafter "certificates" or "qualifications"), the factors that influence certificate acquisition, and the resulting employment and wage effects.…

  7. NASA SLS Booster Nozzle Plug Pieces Fly During Test

    NASA Image and Video Library

    2016-06-28

    On June 28, a test version of the booster that will help power NASA's new rocket, the Space Launch System, fired up at nearly 6,000 degrees Fahrenheit for a successful, two-minute qualification test at Orbital ATK's test facilities in Promontory, Utah. This video shows the booster's nozzle plug intentionally breaking apart. The smoky ring coming off the booster is condensed water vapor created by a pressure difference between the motor gas and normal air. The nozzle plug is an environmental barrier to prevent heat, dust and moisture from getting inside the booster before it ignites. The plug isn't always part of a static test but was included on this one due to changes made to the hardware. The foam on the plug is denser than previous NASA launch vehicles, as the engines are now in the same plane as the boosters. A numbered grid was placed on the exterior of the plug before the test so the pieces retrieved could support plug breakup assessment and reconstruction. Along with video, collecting the pieces helps determine the size and speed of them when they break apart. Nozzle plug pieces were found as far as 1,500 to 2,000 feet away from the booster. This is the last full-scale qualification test for the booster before the first, uncrewed flight of SLS with the Orion spacecraft in 2018.

  8. The qualification of the shuttle booster separation motors

    NASA Technical Reports Server (NTRS)

    Chase, C. A.; Fisher, K. M.; Eoff, W.

    1978-01-01

    Four booster separation motors (BSM) located at each end of every solid rocket booster (SRB) provide the needed side force to separate the boosters from the external tank at booster burnout. Four BSMs at the top of the SRB are located in a box pattern in the nose cone frustum. The four BSMs at the aft end of the SRB are arranged side-by-side on the SRB aft skirt. Aspects of BSM design and performance are considered, taking into account a motor design/performance summary, the case design, the insulation, the grain design, the nozzle/aft closure design, the ignition system, the propellant, and the motor assembly. Details of motor testing are also discussed, giving attention to development testing, qualification testing, and flight testing.

  9. Field tests prove microscale NRU to upgrade low-btu gas

    USGS Publications Warehouse

    Bhattacharya, Saibal; Newell, K. David; Watney, W. Lynn; Sigel, Micael

    2009-01-01

    The Kansas Geological Survey (University of Kansas) and the American Energies Corp., Wichita, have conducted field tests of a scalable, microscale, N2-rejection unit (NRU) to demonstrate its effectiveness to upgrade low-pressure ((<100 psig) and low-volume (=100 Mcfd) low-btu gas to pipeline quality. The tests aim to develop inexpensive NRU technology, which is designed for low- volume, low-pressure gas wells, to significantly increase the contribution of marginal low-btu gas to the gas supply of the US. The NRU uses two towers and uses three stages, namely, adsorption under pressure, venting to 2 psig, and desorption under vacuum. The modular design allows additional sets of towers to be added or removed to handle increases or decreases in feed volumes. The field tests also reveal that a strong compressor, which is capable of evacuating the tower (volume) as quickly as possible, should be employed to reduce process cycle time and increase plant throughput.

  10. Evaluation of long-term gas hydrate production testing locations on the Alaska North Slope

    USGS Publications Warehouse

    Collett, Timothy S.; Boswell, Ray; Lee, Myung W.; Anderson, Brian J.; Rose, Kelly K.; Lewis, Kristen A.

    2012-01-01

    The results of short-duration formation tests in northern Alaska and Canada have further documented the energy-resource potential of gas hydrates and have justified the need for long-term gas-hydrate-production testing. Additional data acquisition and long-term production testing could improve the understanding of the response of naturally occurring gas hydrate to depressurization-induced or thermal-, chemical-, or mechanical-stimulated dissociation of gas hydrate into producible gas. The Eileen gashydrate accumulation located in the Greater Prudhoe Bay area in northern Alaska has become a focal point for gas-hydrate geologic and production studies. BP Exploration (Alaska) Incorporated and ConocoPhillips have each established research partnerships with the US Department of Energy to assess the production potential of gas hydrates in northern Alaska. A critical goal of these efforts is to identify the most suitable site for production testing. A total of seven potential locations in the Prudhoe Bay, Kuparuk River, and Milne Point production units were identified and assessed relative to their suitability as a long-term gas-hydrate-production test sites. The test-site-assessment criteria included the analysis of the geologic risk associated with encountering reservoirs for gas-hydrate testing. The site-selection process also dealt with the assessment of the operational/logistical risk associated with each of the potential test sites. From this review, a site in the Prudhoe Bay production unit was determined to be the best location for extended gas-hydrate-production testing. The work presented in this report identifies the key features of the potential test site in the Greater Prudhoe Bay area and provides new information on the nature of gas-hydrate occurrence and the potential impact of production testing on existing infrastructure at the most favorable sites. These data were obtained from well-log analysis, geological correlation and mapping, and numerical

  11. 10 CFR 603.515 - Qualification of a consortium.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Pre-Award Business Evaluation Recipient Qualification § 603.515 Qualification of a consortium. (a) A consortium that... under the agreement. (b) If the prospective recipient of a TIA is a consortium that is not formally...

  12. 10 CFR 603.515 - Qualification of a consortium.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Pre-Award Business Evaluation Recipient Qualification § 603.515 Qualification of a consortium. (a) A consortium that... under the agreement. (b) If the prospective recipient of a TIA is a consortium that is not formally...

  13. 10 CFR 603.515 - Qualification of a consortium.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Pre-Award Business Evaluation Recipient Qualification § 603.515 Qualification of a consortium. (a) A consortium that... under the agreement. (b) If the prospective recipient of a TIA is a consortium that is not formally...

  14. 29 CFR 1926.1076 - Qualifications of dive team.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 8 2011-07-01 2011-07-01 false Qualifications of dive team. 1926.1076 Section 1926.1076 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION... § 1926.1076 Qualifications of dive team. Note: The requirements applicable to construction work under...

  15. 29 CFR 1926.1076 - Qualifications of dive team.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Qualifications of dive team. 1926.1076 Section 1926.1076 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION... § 1926.1076 Qualifications of dive team. Note: The requirements applicable to construction work under...

  16. 29 CFR 1926.1076 - Qualifications of dive team.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 8 2013-07-01 2013-07-01 false Qualifications of dive team. 1926.1076 Section 1926.1076 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION... § 1926.1076 Qualifications of dive team. Note: The requirements applicable to construction work under...

  17. 29 CFR 1926.1076 - Qualifications of dive team.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 8 2014-07-01 2014-07-01 false Qualifications of dive team. 1926.1076 Section 1926.1076 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION... § 1926.1076 Qualifications of dive team. Note: The requirements applicable to construction work under...

  18. 29 CFR 1926.1076 - Qualifications of dive team.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false Qualifications of dive team. 1926.1076 Section 1926.1076 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION... § 1926.1076 Qualifications of dive team. Note: The requirements applicable to construction work under...

  19. 14 CFR 121.439 - Pilot qualification: Recent experience.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Pilot qualification: Recent experience. 121.439 Section 121.439 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Pilot qualification: Recent experience. (a) No certificate holder may use any person nor may any person...

  20. 14 CFR 121.439 - Pilot qualification: Recent experience.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Pilot qualification: Recent experience. 121.439 Section 121.439 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Pilot qualification: Recent experience. (a) No certificate holder may use any person nor may any person...

  1. 14 CFR 125.285 - Pilot qualifications: Recent experience.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Pilot qualifications: Recent experience. 125.285 Section 125.285 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Requirements § 125.285 Pilot qualifications: Recent experience. (a) No certificate holder may use any person...

  2. 14 CFR 125.285 - Pilot qualifications: Recent experience.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Pilot qualifications: Recent experience. 125.285 Section 125.285 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Requirements § 125.285 Pilot qualifications: Recent experience. (a) No certificate holder may use any person...

  3. 14 CFR 125.285 - Pilot qualifications: Recent experience.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Pilot qualifications: Recent experience. 125.285 Section 125.285 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Requirements § 125.285 Pilot qualifications: Recent experience. (a) No certificate holder may use any person...

  4. 32 CFR 571.2 - Basic qualifications for enlistment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 3 2014-07-01 2014-07-01 false Basic qualifications for enlistment. 571.2 Section 571.2 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY PERSONNEL RECRUITING AND ENLISTMENTS Recruiting and Enlistment Eligibility § 571.2 Basic qualifications for enlistment...

  5. 10 CFR 61.61 - Applicant qualifications and assurances.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Applicant qualifications and assurances. 61.61 Section 61.61 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Financial Assurances § 61.61 Applicant qualifications and assurances. Each applicant shall...

  6. 10 CFR 61.61 - Applicant qualifications and assurances.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Applicant qualifications and assurances. 61.61 Section 61.61 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Financial Assurances § 61.61 Applicant qualifications and assurances. Each applicant shall...

  7. 10 CFR 61.61 - Applicant qualifications and assurances.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Applicant qualifications and assurances. 61.61 Section 61.61 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Financial Assurances § 61.61 Applicant qualifications and assurances. Each applicant shall...

  8. 10 CFR 61.61 - Applicant qualifications and assurances.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Applicant qualifications and assurances. 61.61 Section 61.61 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Financial Assurances § 61.61 Applicant qualifications and assurances. Each applicant shall...

  9. 10 CFR 61.61 - Applicant qualifications and assurances.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Applicant qualifications and assurances. 61.61 Section 61.61 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Financial Assurances § 61.61 Applicant qualifications and assurances. Each applicant shall...

  10. Transformation of Learning in Education and Training: Key Qualifications Revisited. CEDEFOP Reference Series.

    ERIC Educational Resources Information Center

    Kamarainen, Pekka, Ed.; Attwell, Graham, Ed.; Brown, Alan, Ed.

    This book contains 15 papers examining European approaches to the theme of key qualifications. The following papers are included: "Key Qualifications Revisited: An Introduction" (Pekka Kamarainen); "Exploring Key Qualifications: Context, Theory, and Practice in Europe" (Pekka Kamarainen); "Rethinking Key Qualifications:…

  11. 49 CFR 240.405 - Processing qualification review petitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Processing qualification review petitions. 240.405... Resolution Procedures § 240.405 Processing qualification review petitions. (a) Each petition shall be acknowledged in writing by FRA. The acknowledgment shall contain the docket number assigned to the petition and...

  12. 27 CFR 19.823 - Changes after original qualification.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Changes after original... Vaporizing Process Qualification Documents § 19.823 Changes after original qualification. When there is a change in the information recorded in the original approved application, the proprietor shall make a...

  13. 14 CFR 135.247 - Pilot qualifications: Recent experience.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualifications: Recent experience... Flight Crewmember Requirements § 135.247 Pilot qualifications: Recent experience. (a) No certificate holder may use any person, nor may any person serve, as pilot in command of an aircraft carrying...

  14. 14 CFR 135.247 - Pilot qualifications: Recent experience.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Pilot qualifications: Recent experience... Flight Crewmember Requirements § 135.247 Pilot qualifications: Recent experience. (a) No certificate holder may use any person, nor may any person serve, as pilot in command of an aircraft carrying...

  15. Methods Data Qualification Interim Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. Sam Alessi; Tami Grimmett; Leng Vang

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models representmore » the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V&V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.« less

  16. 29 CFR 452.53 - Application of qualifications for office.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirement. A qualification which is not part of the constitution and bylaws or other duly enacted rules of... Federal or State law. 32 Qualifications must be specific and objective. They must contain specific...

  17. 29 CFR 452.53 - Application of qualifications for office.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requirement. A qualification which is not part of the constitution and bylaws or other duly enacted rules of... Federal or State law. 32 Qualifications must be specific and objective. They must contain specific...

  18. Transportation monitoring unit qualification

    NASA Technical Reports Server (NTRS)

    Cook, M.

    1990-01-01

    Transportation monitoring unit (TMU) qualification testing was performed between 3 Mar. and 14 Dec. 1989. The purpose of the testing was to qualify the TMUs to monitor and store temperature and acceleration data on redesigned solid rocket motor segments and exit cones while they are being shipped from Utah's Thiokol Corporation, Space Operations, to Kennedy Space Center. TMUs were subjected to transportation tests that concerned the structural integrity of the TMUs only, and did not involve TMU measuring capability. This testing was terminated prior to completion due to mounting plate failures, high and low temperature shutdown failures, and data collection errors. Corrective actions taken by the vendor to eliminate high temperature shutdowns were ineffective. An evaluation was performed on the TMUs to determine the TMU vibration and temperature measuring accuracy at a variety of temperatures. This test demonstrated that TMU measured shock levels are high, and that TMUs are temperature sensitive because of decreased accuracy at high and low temperatures. It was determined that modifications to the current TMU system, such that it could be qualified for use, would require a complete redesign and remanufacture. Because the cost of redesigning and remanufacturing the present TMU system exceeds the cost of procuring a new system that could be qualified without modification, it is recommended that an alternate transportation monitoring system be qualified.

  19. Direct-Drive Gas-Cooled Reactor Power System: Concept and Preliminary Testing

    NASA Technical Reports Server (NTRS)

    Wright, S. A.; Lipinski, R. J.; Godfroy, T. J.; Bragg-Sitton, S. M.; VanDyke, M. K.

    2002-01-01

    This paper describes the concept and preliminary component testing of a gas-cooled, UN-fueled, pin-type reactor which uses He/Xe gas that goes directly into a recuperated Brayton system to produce electricity for nuclear electric propulsion. This Direct-Drive Gas-Cooled Reactor (DDG) is designed to be subcritical under water or wet- sand immersion in case of a launch accident. Because the gas-cooled reactor can directly drive the Brayton turbomachinery, it is possible to configure the system such that there are no external surfaces or pressure boundaries that are refractory metal, even though the gas delivered to the turbine is 1144 K. The He/Xe gas mixture is a good heat transport medium when flowing, and a good insulator when stagnant. Judicious use of stagnant cavities as insulating regions allows transport of the 1144-K gas while keeping all external surfaces below 900 K. At this temperature super-alloys (Hastelloy or Inconel) can be used instead of refractory metals. Super-alloys reduce the technology risk because they are easier to fabricate than refractory metals, we have a much more extensive knowledge base on their characteristics, and, because they have a greater resistance to oxidation, system testing is eased. The system is also relatively simple in its design: no additional coolant pumps, heat exchanger, or freeze-thaw systems are required. Key to success of this concept is a good knowledge of the heat transfer between the fuel pins and the gas, as well as the pressure drop through the system. This paper describes preliminary testing to obtain this key information, as well as experience in demonstrating electrically heated testing of simulated reactor components.

  20. Performance Testing of Tracer Gas and Tracer Aerosol Detectors for use in Radionuclide NESHAP Compliance Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fuehne, David Patrick; Lattin, Rebecca Renee

    The Rad-NESHAP program, part of the Air Quality Compliance team of LANL’s Compliance Programs group (EPC-CP), and the Radiation Instrumentation & Calibration team, part of the Radiation Protection Services group (RP-SVS), frequently partner on issues relating to characterizing air flow streams. This memo documents the most recent example of this partnership, involving performance testing of sulfur hexafluoride detectors for use in stack gas mixing tests. Additionally, members of the Rad-NESHAP program performed a functional trending test on a pair of optical particle counters, comparing results from a non-calibrated instrument to a calibrated instrument. Prior to commissioning a new stack samplingmore » system, the ANSI Standard for stack sampling requires that the stack sample location must meet several criteria, including uniformity of tracer gas and aerosol mixing in the air stream. For these mix tests, tracer media (sulfur hexafluoride gas or liquid oil aerosol particles) are injected into the stack air stream and the resulting air concentrations are measured across the plane of the stack at the proposed sampling location. The coefficient of variation of these media concentrations must be under 20% when evaluated over the central 2/3 area of the stack or duct. The instruments which measure these air concentrations must be tested prior to the stack tests in order to ensure their linear response to varying air concentrations of either tracer gas or tracer aerosol. The instruments used in tracer gas and aerosol mix testing cannot be calibrated by the LANL Standards and Calibration Laboratory, so they would normally be sent off-site for factory calibration by the vendor. Operational requirements can prevent formal factory calibration of some instruments after they have been used in hazardous settings, e.g., within a radiological facility with potential airborne contamination. The performance tests described in this document are intended to demonstrate the

  1. Qualification Users' Perceptions and Experiences of Assessment Reliability

    ERIC Educational Resources Information Center

    Chamberlain, Suzanne

    2013-01-01

    This paper presents the findings of a study designed to explore qualification users' perceptions and experiences of reliability in the context of national assessment outcomes in England. The study consisted of 17 focus groups conducted across six sectors of qualification users: students, teachers, trainee teachers, job-seekers, employers and…

  2. 30 CFR 75.155 - Qualified hoisting engineer; qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-hoisting engineer; or (2) If a State has no program for qualifying persons as electric-hoisting engineers... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Qualified hoisting engineer; qualifications. 75... Persons § 75.155 Qualified hoisting engineer; qualifications. (a)(1) A person is a qualified hoisting...

  3. 30 CFR 75.155 - Qualified hoisting engineer; qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-hoisting engineer; or (2) If a State has no program for qualifying persons as electric-hoisting engineers... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Qualified hoisting engineer; qualifications. 75... Persons § 75.155 Qualified hoisting engineer; qualifications. (a)(1) A person is a qualified hoisting...

  4. 30 CFR 75.155 - Qualified hoisting engineer; qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-hoisting engineer; or (2) If a State has no program for qualifying persons as electric-hoisting engineers... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Qualified hoisting engineer; qualifications. 75... Persons § 75.155 Qualified hoisting engineer; qualifications. (a)(1) A person is a qualified hoisting...

  5. 30 CFR 75.155 - Qualified hoisting engineer; qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-hoisting engineer; or (2) If a State has no program for qualifying persons as electric-hoisting engineers... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Qualified hoisting engineer; qualifications. 75... Persons § 75.155 Qualified hoisting engineer; qualifications. (a)(1) A person is a qualified hoisting...

  6. 30 CFR 75.155 - Qualified hoisting engineer; qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-hoisting engineer; or (2) If a State has no program for qualifying persons as electric-hoisting engineers... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Qualified hoisting engineer; qualifications. 75... Persons § 75.155 Qualified hoisting engineer; qualifications. (a)(1) A person is a qualified hoisting...

  7. Uptake and Utility of VET Qualifications. Research Report

    ERIC Educational Resources Information Center

    Korbel, Patrick; Misko, Josie

    2016-01-01

    Training packages and accredited courses are the core training products of the nationally accredited vocational education and training (VET) system in Australia. This report considers the use of these training packages and the qualifications contained within them. The report also examines the pattern of enrolments in qualifications to determine…

  8. 14 CFR 121.437 - Pilot qualification: Certificates required.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Pilot qualification: Certificates required... Pilot qualification: Certificates required. (a) No pilot may act as pilot in command of an aircraft (or... pilots) unless he holds an airline transport pilot certificate and an appropriate type rating for that...

  9. 14 CFR 121.437 - Pilot qualification: Certificates required.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualification: Certificates required... Pilot qualification: Certificates required. (a) No pilot may act as pilot in command of an aircraft (or... pilots) unless he holds an airline transport pilot certificate and an appropriate type rating for that...

  10. 14 CFR 125.285 - Pilot qualifications: Recent experience.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualifications: Recent experience... Requirements § 125.285 Pilot qualifications: Recent experience. (a) No certificate holder may use any person, nor may any person serve, as a required pilot flight crewmember unless within the preceding 90...

  11. 14 CFR 125.285 - Pilot qualifications: Recent experience.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Pilot qualifications: Recent experience... Requirements § 125.285 Pilot qualifications: Recent experience. (a) No certificate holder may use any person, nor may any person serve, as a required pilot flight crewmember unless within the preceding 90...

  12. 12 CFR 193.3 - Qualification of public accountant.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 1 2013-01-01 2013-01-01 false Qualification of public accountant. 193.3... REQUIREMENTS Form and Content of Financial Statements § 193.3 Qualification of public accountant. The term “qualified public accountant” means a certified public accountant or licensed public accountant certified or...

  13. 12 CFR 193.3 - Qualification of public accountant.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 1 2014-01-01 2014-01-01 false Qualification of public accountant. 193.3... REQUIREMENTS Form and Content of Financial Statements § 193.3 Qualification of public accountant. The term “qualified public accountant” means a certified public accountant or licensed public accountant certified or...

  14. 12 CFR 193.3 - Qualification of public accountant.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 1 2012-01-01 2012-01-01 false Qualification of public accountant. 193.3... REQUIREMENTS Form and Content of Financial Statements § 193.3 Qualification of public accountant. The term “qualified public accountant” means a certified public accountant or licensed public accountant certified or...

  15. 42 CFR 410.77 - Certified nurse-midwives' services: Qualifications and conditions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Certified nurse-midwives' services: Qualifications... Medical and Other Health Services § 410.77 Certified nurse-midwives' services: Qualifications and conditions. (a) Qualifications. For Medicare coverage of his or her services, a certified nurse-midwife must...

  16. 42 CFR 410.77 - Certified nurse-midwives' services: Qualifications and conditions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 2 2011-10-01 2011-10-01 false Certified nurse-midwives' services: Qualifications... Medical and Other Health Services § 410.77 Certified nurse-midwives' services: Qualifications and conditions. (a) Qualifications. For Medicare coverage of his or her services, a certified nurse-midwife must...

  17. 29 CFR 1918.98 - Qualifications of machinery operators and supervisory training.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 7 2013-07-01 2013-07-01 false Qualifications of machinery operators and supervisory... General Working Conditions. § 1918.98 Qualifications of machinery operators and supervisory training. (a) Qualification of machinery operators. (1) Only an employee determined by the employer to be competent by reason...

  18. 29 CFR 1918.98 - Qualifications of machinery operators and supervisory training.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 7 2012-07-01 2012-07-01 false Qualifications of machinery operators and supervisory... General Working Conditions. § 1918.98 Qualifications of machinery operators and supervisory training. (a) Qualification of machinery operators. (1) Only an employee determined by the employer to be competent by reason...

  19. 29 CFR 1918.98 - Qualifications of machinery operators and supervisory training.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Qualifications of machinery operators and supervisory... General Working Conditions. § 1918.98 Qualifications of machinery operators and supervisory training. (a) Qualification of machinery operators. (1) Only an employee determined by the employer to be competent by reason...

  20. 29 CFR 1918.98 - Qualifications of machinery operators and supervisory training.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Qualifications of machinery operators and supervisory... General Working Conditions. § 1918.98 Qualifications of machinery operators and supervisory training. (a) Qualification of machinery operators. (1) Only an employee determined by the employer to be competent by reason...

  1. Study of Residual Gas Analyser (RGA) Response towards Known Leaks

    NASA Astrophysics Data System (ADS)

    Pathan, Firozkhan S.; Khan, Ziauddin; Semwal, Pratibha; George, Siju; Raval, Dilip C.; Thankey, Prashant L.; Manthena, Himabindu; Yuvakiran, Paravastu; Dhanani, Kalpesh R.

    2012-11-01

    Helium leak testing is the most versatile form of weld qualification test for any vacuum application. Almost every ultra-high vacuum (UHV) system utilizes this technique for insuring leak tightness for the weld joints as well as demountable joints. During UHV system under operational condition with many other integrated components, in-situ developed leaks identification becomes one of the prime aspect for maintaining the health of such system and for continuing the experiments onwards. Since online utilization of leak detector (LD) has many practical limitations, residual gas analyser (RGA) can be used as a potential instrument for online leak detection. For this purpose, a co-relation for a given leak rate between Leak Detector and RGA is experimentally established. This paper describes the experimental aspect and the relationship between leak detector and RGA.

  2. National Vocational Qualifications in the United Kingdom: Their Origins and Legacy

    ERIC Educational Resources Information Center

    Young, Michael

    2011-01-01

    National Vocational Qualifications (NVQs) were launched in the United Kingdom (excluding Scotland) in 1987 as a framework for rationalising what was described at the time as the "jungle" of existing vocational qualifications. They were never intended to be the basis for a comprehensive NQF for all qualifications; however, successive…

  3. 32 CFR 935.139 - Motor vehicle operator qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Motor vehicle operator qualifications. 935.139... AND INSULAR REGULATIONS WAKE ISLAND CODE Motor Vehicle Code § 935.139 Motor vehicle operator qualifications. (a) No person may operate a privately owned motor vehicle on Wake Island unless he has an island...

  4. The Qualifications of Teachers in American High Schools.

    ERIC Educational Resources Information Center

    Pascal, Anthony

    This monograph describes the formal qualifications of the teachers currently teaching in public high schools and notes the variations of qualifications among schools with different characteristics. A survey of an average of 30 randomly selected teachers in each of 340 comprehensive high schools obtained information on: (1) the number of college…

  5. 32 CFR 935.139 - Motor vehicle operator qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Motor vehicle operator qualifications. 935.139... AND INSULAR REGULATIONS WAKE ISLAND CODE Motor Vehicle Code § 935.139 Motor vehicle operator qualifications. (a) No person may operate a privately owned motor vehicle on Wake Island unless he has an island...

  6. 14 CFR 121.439 - Pilot qualification: Recent experience.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Pilot qualification: Recent experience. 121... Pilot qualification: Recent experience. (a) No certificate holder may use any person nor may any person serve as a required pilot flight crewmember, unless within the preceding 90 days, that person has made...

  7. 14 CFR 121.439 - Pilot qualification: Recent experience.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualification: Recent experience. 121... Pilot qualification: Recent experience. (a) No certificate holder may use any person nor may any person serve as a required pilot flight crewmember, unless within the preceding 90 days, that person has made...

  8. 12 CFR 390.382 - Qualification of public accountant.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 5 2012-01-01 2012-01-01 false Qualification of public accountant. 390.382....382 Qualification of public accountant. (See also 17 CFR 210.2-01.) The term “qualified public accountant” means a certified public accountant or licensed public accountant certified or licensed by a...

  9. Integrated System Test Approaches for the NASA Ares I Crew Launch Vehicle

    NASA Technical Reports Server (NTRS)

    Cockrell, Charles

    2008-01-01

    NASA is maturing test and evaluation plans leading to flight readiness of the Ares I crew launch vehicle. Key development, qualification, and verification tests are planned . Upper stage engine sea-level and altitude testing. First stage development and qualification motors. Upper stage structural and thermal development and qualification test articles. Main Propulsion Test Article (MPTA). Upper stage green run testing. Integrated Vehicle Ground Vibration Testing (IVGVT). Aerodynamic characterization testing. Test and evaluation supports initial validation flights (Ares I-Y and Orion 1) and design certification.

  10. 14 CFR 61.55 - Second-in-command qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Second-in-command qualifications. 61.55...-in-command qualifications. (a) A person may serve as a second-in-command of an aircraft type certificated for more than one required pilot flight crewmember or in operations requiring a second-in-command...

  11. 14 CFR 135.245 - Second in command qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Second in command qualifications. 135.245... Crewmember Requirements § 135.245 Second in command qualifications. (a) Except as provided in paragraph (b), no certificate holder may use any person, nor may any person serve, as second in command of an...

  12. 14 CFR 135.243 - Pilot in command qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Pilot in command qualifications. 135.243... Crewmember Requirements § 135.243 Pilot in command qualifications. (a) No certificate holder may use a person, nor may any person serve, as pilot in command in passenger-carrying operations— (1) Of a turbojet...

  13. 14 CFR 135.243 - Pilot in command qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Pilot in command qualifications. 135.243... Crewmember Requirements § 135.243 Pilot in command qualifications. (a) No certificate holder may use a person, nor may any person serve, as pilot in command in passenger-carrying operations— (1) Of a turbojet...

  14. 14 CFR 61.55 - Second-in-command qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Second-in-command qualifications. 61.55...-in-command qualifications. (a) A person may serve as a second-in-command of an aircraft type certificated for more than one required pilot flight crewmember or in operations requiring a second-in-command...

  15. 14 CFR 135.243 - Pilot in command qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot in command qualifications. 135.243... Crewmember Requirements § 135.243 Pilot in command qualifications. (a) No certificate holder may use a person, nor may any person serve, as pilot in command in passenger-carrying operations— (1) Of a turbojet...

  16. 14 CFR 135.245 - Second in command qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Second in command qualifications. 135.245... Crewmember Requirements § 135.245 Second in command qualifications. (a) Except as provided in paragraph (b), no certificate holder may use any person, nor may any person serve, as second in command of an...

  17. 14 CFR 135.245 - Second in command qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Second in command qualifications. 135.245... Crewmember Requirements § 135.245 Second in command qualifications. (a) Except as provided in paragraph (b), no certificate holder may use any person, nor may any person serve, as second in command of an...

  18. 14 CFR 135.243 - Pilot in command qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Pilot in command qualifications. 135.243... Crewmember Requirements § 135.243 Pilot in command qualifications. (a) No certificate holder may use a person, nor may any person serve, as pilot in command in passenger-carrying operations— (1) Of a turbojet...

  19. 14 CFR 135.245 - Second in command qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Second in command qualifications. 135.245... Crewmember Requirements § 135.245 Second in command qualifications. (a) Except as provided in paragraph (b), no certificate holder may use any person, nor may any person serve, as second in command of an...

  20. 14 CFR 61.55 - Second-in-command qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Second-in-command qualifications. 61.55...-in-command qualifications. (a) A person may serve as a second-in-command of an aircraft type certificated for more than one required pilot flight crewmember or in operations requiring a second-in-command...