Science.gov

Sample records for quality control implementation

  1. 78 FR 15895 - Approval and Promulgation of Air Quality Implementation Plans: North Carolina; Control Techniques...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-13

    ..., Emission Control Standards, Monitoring and Recordkeeping and Air Quality Permit Procedures and are not... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans: North Carolina; Control Techniques Guidelines and Reasonably Available Control Technology AGENCY: Environmental...

  2. 76 FR 27622 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-12

    ... of Control Techniques Guidelines for Large Appliance Coatings AGENCY: Environmental Protection Agency... Available Control Technology (RACT) for sources covered by EPA's Control Techniques Guidelines (CTG... Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control Techniques Guidelines for...

  3. 78 FR 34306 - Approval and Promulgation of Air Quality Implementation Plans: North Carolina; Control Techniques...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-07

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans: North Carolina; Control Techniques Guidelines and Reasonably Available Control Technology AGENCY: Environmental Protection... approval of its reasonably available control technology (RACT) requirements for volatile organic...

  4. CR mammography: Design and implementation of a quality control program

    SciTech Connect

    Moreno-Ramirez, A.; Brandan, M. E.; Villasenor-Navarro, Y.; Galvan, H. A.; Ruiz-Trejo, C.

    2012-10-23

    Despite the recent acquisition of significant quantities of computed radiography CR equipment for mammography, Mexican regulations do not specify the performance requirements for digital systems such as those of CR type. The design of a quality control program QCP specific for CR mammography systems was thus considered relevant. International protocols were taken as reference to define tests, procedures and acceptance criteria. The designed QCP was applied in three CR mammography facilities. Important deficiencies in spatial resolution, noise, image receptor homogeneity, artifacts and breast thickness compensation were detected.

  5. CR mammography: Design and implementation of a quality control program

    NASA Astrophysics Data System (ADS)

    Moreno-Ramírez, A.; Brandan, M. E.; Villaseñor-Navarro, Y.; Galván, H. A.; Ruiz-Trejo, C.

    2012-10-01

    Despite the recent acquisition of significant quantities of computed radiography CR equipment for mammography, Mexican regulations do not specify the performance requirements for digital systems such as those of CR type. The design of a quality control program QCP specific for CR mammography systems was thus considered relevant. International protocols were taken as reference to define tests, procedures and acceptance criteria. The designed QCP was applied in three CR mammography facilities. Important deficiencies in spatial resolution, noise, image receptor homogeneity, artifacts and breast thickness compensation were detected.

  6. 77 FR 45307 - Approval and Promulgation of Air Quality Implementation Plans: Georgia; Control Techniques...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-31

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans: Georgia; Control Techniques Guidelines and Reasonably Available Control Technology AGENCY: Environmental Protection Agency..., in the alternative, to conditionally approve that revision which relates to certain...

  7. 77 FR 71700 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of Stationary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of... Resources and Environmental Control (DNREC) State Implementation Plan (SIP). The revision amends Regulation... Natural Resources and Environmental Control, 89 Kings Highway, P.O. Box 1401, Dover, Delaware 19903....

  8. 78 FR 58460 - Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control District and Feather River Air Quality Management District; Stationary Source Permits... California as a revision to the Placer County Air Pollution Control District (PCAPCD) and Feather River...

  9. Implementation of Quality Assurance and Quality Control Measures in the National Phenology Database

    NASA Astrophysics Data System (ADS)

    Gerst, K.; Rosemartin, A.; Denny, E. G.; Marsh, L.; Barnett, L.

    2015-12-01

    The USA National Phenology Network (USA-NPN; www.usanpn.org) serves science and society by promoting a broad understanding of plant and animal phenology and the relationships among phenological patterns and environmental change. The National Phenology Database has over 5.5 million observation records for plants and animals for the period 1954-2015. These data have been used in a number of science, conservation and resource management applications, including national assessments of historical and potential future trends in phenology, regional assessments of spatio-temporal variation in organismal activity, and local monitoring for invasive species detection. Customizable data downloads are freely available, and data are accompanied by FGDC-compliant metadata, data-use and data-attribution policies, and vetted documented methodologies and protocols. The USA-NPN has implemented a number of measures to ensure both quality assurance and quality control. Here we describe the resources that have been developed so that incoming data submitted by both citizen and professional scientists are reliable; these include training materials, such as a botanical primer and species profiles. We also describe a number of automated quality control processes applied to incoming data streams to optimize data output quality. Existing and planned quality control measures for output of raw and derived data include: (1) Validation of site locations, including latitude, longitude, and elevation; (2) Flagging of records that conflict for a given date for an individual plant; (3) Flagging where species occur outside known ranges; (4) Flagging of records when phenophases occur outside of the plausible order for a species; (5) Flagging of records when intensity measures do not follow a plausible progression for a phenophase; (6) Flagging of records when a phenophase occurs outside of the plausible season, and (7) Quantification of precision and uncertainty for estimation of phenological metrics

  10. 76 FR 40246 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Control of Gasoline...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; Control of... INFORMATION CONTACT: Carolyn Persoon, Environmental Engineer, Control Strategies Section, Air Programs Branch.... List of Subjects in 40 CFR Part 52 Air pollution control, Carbon monoxide, Intergovernmental...

  11. 77 FR 22676 - Revisions to the Arizona State Implementation Plan, Pinal County Air Quality Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-17

    ... AGENCY 40 CFR Part 52 Revisions to the Arizona State Implementation Plan, Pinal County Air Quality Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing a limited approval and limited disapproval of a revision to the Pinal County Air Quality...

  12. Minimum Flying Qualities. Volume 3. Program CC’s Implementation of the Human Optimal Control Model

    DTIC Science & Technology

    1990-01-01

    BTIC FILE COPY WRDC-TR-89-3125 Volume III Lfl MINIMUM FLYING QUALITIES _ Volume III: Program CC’s Implementation of the Human Optimal Control Model...technical report has been reviewed and is approved for publica- tion. CAPT MARK J. DETROIT, USAF DAVID K. BOWSER, Chief Control Dynamics Branch... Controls Dynamics Branch Flight Control Division Flight Control Division FOR THE CO.’,ANDER H. MAX DAVIS, Assistant for Research and Technology Flight

  13. 75 FR 18142 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Control of Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Texas; Control of Air Pollution From Motor Vehicles AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule... Title 30 of the Texas Administrative Code (TAC), Chapter 114, Control of Air Pollution from...

  14. 77 FR 71751 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of Stationary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of... State submittal are available at the Delaware Department of Natural Resources and Environmental...

  15. 75 FR 32858 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of Nitrogen...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-10

    ... From the Federal Register Online via the Government Publishing Office ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of Nitrogen Oxide Emissions From Industrial Boilers and Process Heaters at Petroleum Refineries Correction...

  16. Implementing New Quality Control and Processing Systems for Hourly Precipitation Data

    NASA Astrophysics Data System (ADS)

    Rennie, J.; Wilson, A.; Lawrimore, J. H.; Ray, R.; Menne, M. J.

    2011-12-01

    ://www.ncdc.noaa.gov/hrlyhpd/ These data have been quality controlled using a set of checks including checks for spikes, global extremes, gaps, and climatological outliers. Efforts are ongoing to implement a complete suite of quality control procedures developed through empirical assessments of false positive and flag rates. Once completed these new quality control procedures will replace the current process of manual review and editing which is part of the DSI-3240 Hourly Precipitation Dataset. This paper will provide a synopsis of the new processing system, including data ingest, as well as an extensive overview of the current and proposed quality control algorithms.

  17. 78 FR 12267 - Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... Pollution Control District and Feather River Air Quality Management District; Stationary Source Permits... County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District...

  18. [Practical aspects of implementation quality management system ISO 9001:2000 by hospital infection control team].

    PubMed

    Kuziemski, Arkadiusz; Czerniak, Beata; Frankowska, Krystyna; Gonia, Ewa; Salińska, Teresa; Motuk, Andrzej; Sobociński, Zbigniew

    2009-01-01

    In 2006 the Board of the Jan Biziel Hospital in Bydgoszcz decided to include procedures of health services in the implementation process within the confines of ISO 9001:2000 certification. The hospital infection control team that has operated in the hospital since 1989 performed the analysis of the forms of activities to date and on that basis the team prepared original plan of quality management. In April 2007, this plan was successfully accepted by the certifying team. The aim of this study is to present the aforementioned plan which is the result of 18 years experience of the team. At the same time, I hope that this study will be very helpful for all professionals interested in hospital epidemiology, especially in the context of implementing quality management systems.

  19. SU-E-T-103: Development and Implementation of Web Based Quality Control Software

    SciTech Connect

    Studinski, R; Taylor, R; Angers, C; La Russa, D; Clark, B

    2014-06-01

    Purpose: Historically many radiation medicine programs have maintained their Quality Control (QC) test results in paper records or Microsoft Excel worksheets. Both these approaches represent significant logistical challenges, and are not predisposed to data review and approval. It has been our group's aim to develop and implement web based software designed not just to record and store QC data in a centralized database, but to provide scheduling and data review tools to help manage a radiation therapy clinics Equipment Quality control program. Methods: The software was written in the Python programming language using the Django web framework. In order to promote collaboration and validation from other centres the code was made open source and is freely available to the public via an online source code repository. The code was written to provide a common user interface for data entry, formalize the review and approval process, and offer automated data trending and process control analysis of test results. Results: As of February 2014, our installation of QAtrack+ has 180 tests defined in its database and has collected ∼22 000 test results, all of which have been reviewed and approved by a physicist via QATrack+'s review tools. These results include records for quality control of Elekta accelerators, CT simulators, our brachytherapy programme, TomoTherapy and Cyberknife units. Currently at least 5 other centres are known to be running QAtrack+ clinically, forming the start of an international user community. Conclusion: QAtrack+ has proven to be an effective tool for collecting radiation therapy QC data, allowing for rapid review and trending of data for a wide variety of treatment units. As free and open source software, all source code, documentation and a bug tracker are available to the public at https://bitbucket.org/tohccmedphys/qatrackplus/.

  20. Integrated quality control: implementation and validation of instrument function checks and procedural controls for a cartridge-based point-of-care system for critical care analysis.

    PubMed

    D'Orazio, Paul; Mansouri, Sohrab

    2013-03-01

    In this article, the process used to develop and validate an integrated quality-control system for a cartridge-based, point-of-care system for critical care analysis is outlined. Application of risk management principles has resulted in a quality control system using a combination of statistical quality control with onboard reference solutions and failure pattern recognition used to flag common failure modes during the analytical phase of the testing process. A combination of traditional external quality control, integrated quality control to monitor ongoing instrument functionality, operator training, and other laboratory-implemented monitors is most effective in controlling known failure modes during the testing process.

  1. 76 FR 11983 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Adoption of Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ...; Adoption of Control Techniques Guidelines for Paper, Film, and Foil Surface Coating Processes AGENCY... Available Control Technology (RACT) for sources covered by EPA's Control Techniques Guidelines (CTG... Department of Environmental Protection, Bureau of Air Quality Control, P.O. Box 8468, 400 Market...

  2. 76 FR 31856 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Adoption of Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-02

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION...; Adoption of Control Techniques Guidelines for Flat Wood Paneling Surface Coating Processes AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is approving a State Implementation...

  3. 76 FR 34021 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Control of Nitrogen...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-10

    ...; Control of Nitrogen Oxides Emissions From Glass Melting Furnaces AGENCY: Environmental Protection Agency... oxide (NO X ) emissions from glass melting furnaces. This action is being taken under the Clean Air Act... revision to its State Implementation Plan for the control of NO X from glass melting furnaces....

  4. 76 FR 29180 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Control of Nitrogen...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ...; Control of Nitrogen Oxides Emissions From Portland Cement Kilns AGENCY: Environmental Protection Agency... oxide (NO X ) emissions from Portland cement kilns. This action is being taken under the Clean Air Act... revision to its State Implementation Plan for the control of NO X from Portland cement kilns. I....

  5. 75 FR 18061 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Control of Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... Air Pollution From Motor Vehicles AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final... amend 30 TAC Chapter 114, Control of Air Pollution from Motor Vehicles. These revisions consist of the... to develop air pollution regulations and control strategies to ensure that air quality meets...

  6. 76 FR 58114 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Control of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION...; Control of Particulate Matter Emissions From the Operation of Outdoor Wood-Fired Boilers AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is approving a State Implementation...

  7. Implementation of a quality control system for the Automatic Weather Stations Network from CPTEC/INPE

    NASA Astrophysics Data System (ADS)

    Ferreira, A.; Almeida, W. G.

    2007-05-01

    The observations from INPE's Automatic Weather Stations Network are available for free distribution in the CPTEC webpage just after its processing. Because the automated meteorological stations can report in a high temporal frequency and its quantity is growing, they will be more important over the time. To keep the quality of the distributed data and to help the network management it is needed a complex automated quality control system. To meet these objectives we installed in the CPTEC/INPE the quality control system from MADIS (Meteorological Assimilation Data Ingest System). A software developed by the Forecast Systems Laboratory, from NOAA (National Oceanic and Atmospheric Administration). In this paper we describe this QC system and the results.

  8. Implementation of basic quality control tests for malaria medicines in Amazon Basin countries: results for the 2005–2010 period

    PubMed Central

    2012-01-01

    Background Ensuring the quality of malaria medicines is crucial in working toward malaria control and eventual elimination. Unlike other validated tests that can assess all critical quality attributes, which is the standard for determining the quality of medicines, basic tests are significantly less expensive, faster, and require less skilled labour; yet, these tests provide reproducible data and information on several critical quality attributes, such as identity, purity, content, and disintegration. Visual and physical inspection also provides valuable information about the manufacturing and the labelling of medicines, and in many cases this inspection is sufficient to detect counterfeit medicines. The Promoting the Quality of Medicines (PQM) programme has provided technical assistance to Amazon Malaria Initiative (AMI) countries to implement the use of basic tests as a key screening mechanism to assess the quality of malaria medicines available to patients in decentralized regions. Methods Trained personnel from the National Malaria Control Programmes (NMCPs), often in collaboration with country’s Official Medicine Control Laboratory (OMCL), developed country- specific protocols that encompassed sampling methods, sample analysis, and data reporting. Sampling sites were selected based on malaria burden, accessibility, and geographical location. Convenience sampling was performed and countries were recommended to store the sampled medicines under conditions that did not compromise their quality. Basic analytical tests, such as disintegration and thin layer chromatography (TLC), were performed utilizing a portable mini-laboratory. Results Results were originally presented at regional meetings in a non-standardized format that lacked relevant medicines information. However, since 2008 information has been submitted utilizing a template specifically developed by PQM for that purpose. From 2005 to 2010, the quality of 1,663 malaria medicines from seven AMI countries

  9. The quality analysis system implemented by fragema

    NASA Astrophysics Data System (ADS)

    Kopff, G.

    1988-04-01

    Systematic statistical processing of measurements and quality control data obtained through manufacturing and conformity inspection is necessary for global knowledge of the fuel quality, which is useful both to the designer and to the manufacturer. For this aim the quality control data management and processing system implemented by FRAGEMA is described and illustrated with examples of the different types of statistical quality reports which are printed out.

  10. 76 FR 4578 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... of Control Techniques Guidelines for Flat Wood Paneling Coatings AGENCY: Environmental Protection... Available Control Technology (RACT) for sources covered by EPA's Control Techniques Guidelines (CTG) for... Control Techniques Guidelines for Flat Wood Paneling Coatings,'' that is located in the ``Rules...

  11. Implementation of flow cytometry for quality control in four Danish bull studs.

    PubMed

    Christensen, P; Hansen, C; Liboriussen, T; Lehn-Jensen, H

    2005-02-01

    A flow cytometric method for simultaneous determination of sperm concentration and viability has recently been developed. In 2001, four Danish bull studs purchased flow cytometers and eight technicians were trained for routine analysis of raw and frozen-thawed semen. After initial training of the technicians, an experiment was carried out to document the precision of the system. The aim was also to assess if flow cytometric determination of sperm concentration could result in a more uniform production of semen doses. Results of this experiment showed high precision in the determination of sperm concentration and coefficients of variation were 3.5 and 2.4% for raw and frozen-thawed semen, respectively. Sperm viability was also assessed with high precision and coefficients of variation were 0.9% for raw semen and 1.7% for frozen-thawed semen. Furthermore, the experiment showed that package of semen doses after flow cytometric determination of sperm concentration in the raw semen results in a significantly smaller variation in the number of sperm per dose. In the second experiment, frozen semen was exchanged between the participating studs and were analysed by flow cytometry as well as by microscopic assessments by the eight technicians. Results show that the average correlation between technicians were 0.38 for motility assessments while flow cytometric agreement between technicians was significantly higher (average correlation was 0.86 for sperm viability and 0.92 for sperm concentration). The experiment also showed very high agreements between assessments within lab technician (correlations r=0.98 (sperm concentration) and r=0.99 (sperm viability)). Experiment 3 revealed that straws from the same batch varies in both concentration and viability. It is concluded that flow cytometric determination of sperm concentration and viability can be used to improve semen assessment by AI studs and result in a better quality control.

  12. Air Quality Implementation Plans

    EPA Pesticide Factsheets

    States must develop plans to attain and maintain air quality standards. These plans, known as SIPs, are submitted to EPA for approval. This web site contains information about this process and the current status of the submittals.

  13. 76 FR 14602 - Approval and Promulgation of Air Quality Implementation Plans; Louisiana; Revisions To Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ... for Industrial Cleaning Solvents. Control techniques for the use of industrial cleaning solvents are... Control Techniques Guidelines for Miscellaneous Industrial Adhesives (73 FR 58481, October 7, 2008... To Control Volatile Organic Compound Emissions for Surface Coatings and Graphic Arts...

  14. 76 FR 52917 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Adoption of Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-24

    ...; Adoption of Control Techniques Guidelines for Large Appliance and Metal Furniture Coatings AGENCY... sources) and meets the requirement to adopt Reasonably Available Control Technology (RACT) for sources covered by EPA's Control Techniques Guidelines (CTG) standards for large appliance and metal...

  15. 76 FR 27610 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-12

    ... of Control Techniques Guidelines for Large Appliance Coatings AGENCY: Environmental Protection Agency... Processes and meets the requirement to adopt Reasonably Available Control Technology (RACT) for sources covered by EPA's Control Techniques Guidelines (CTG) standards for large appliance coatings....

  16. 76 FR 10295 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions To Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-24

    ... Control Volatile Organic Compound Emissions From Consumer Related Sources AGENCY: Environmental Protection..., Control of Air Pollution from Volatile Organic Compounds. The State submitted these revisions on March...

  17. 76 FR 52867 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Adoption of Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-24

    ... Reasonably Available Control Technology (RACT) for sources covered by EPA's Control Techniques Guidelines... source is capable of meeting by the application of control technology that is reasonably available... technologies for addressing such emissions, the costs of available control options, and other items....

  18. 75 FR 15348 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revision To Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... Chapter 115 (Reg 5) is amended by: 0 a. Adding an entry for Section 115.110 under Subchapter B, Division 1... Environmental Protection Agency (EPA) is approving a revision to the Texas State Implementation Plan (SIP). The..., 2010. If adverse comments are received, EPA will publish a timely withdrawal of the direct final...

  19. 75 FR 59086 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... of Control Techniques Guidelines for Flexible Packaging Printing AGENCY: Environmental Protection... covered by EPA's Control Techniques Guidelines (CTG) standards for flexible packaging printing. These amendments will reduce emissions of volatile organic compound (VOC) emissions from flexible...

  20. 78 FR 28773 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... of Control Techniques Guidelines for Miscellaneous Metal and Plastic Parts Which Includes Pleasure... control technique guidelines (CTG) for Miscellaneous Metal Parts and Plastic Coating (MMPPC) operations.... The miscellaneous metal product and plastic parts surface coatings categories under section 183(e)...

  1. 76 FR 4534 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... of Control Techniques Guidelines for Flat Wood Paneling Coatings AGENCY: Environmental Protection... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION... covered by EPA's Control Techniques Guidelines (CTG) standards for flat wood paneling coatings....

  2. 76 FR 64015 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... of Control Techniques Guidelines for Drum and Pail Coatings AGENCY: Environmental Protection Agency... revision meets the requirement to adopt Reasonably Available Control Technology (RACT) for sources covered by EPA's Control Techniques Guidelines (CTG) standards for drum and pail coatings and will...

  3. 76 FR 75467 - Approval and Promulgation of Air Quality Implementation Plans; Louisiana; Revisions To Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... Coatings (72 FR 57215, October 9, 2007); Consumer and Commercial Products, Group IV: Control Techniques... CTGs issued in 2006, 2007 and 2008: Consumer and Commercial Products Group II: Control Techniques... 57215, October 9, 2007); Consumer and Commercial Products, Group IV: Control Techniques Guidelines...

  4. 77 FR 41337 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control Technique...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... quality standard (NAAQS) for ozone. This action is being taken under the Clean Air Act (CAA). DATES... plastic parts, metal furniture, large appliances, and miscellaneous metal parts. EPA requires all ozone... substantially as effective as regulations in reducing emissions of VOC in ozone nonattainment areas....

  5. 78 FR 59240 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... of Control Techniques Guidelines for Miscellaneous Metal and Plastic Parts Which Includes Pleasure... technique guidelines (CTG) for Miscellaneous Metal Parts and Plastic Coating (MMPPC) operations and...

  6. 76 FR 64020 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... of Control Techniques Guidelines for Plastic Parts and Business Machines Coatings AGENCY... Foil Coating, and adds new COMAR 26.11.19.07-2, Plastic Parts and Business Machines Coating. Maryland's... covered by EPA's Control Techniques Guidelines (CTG) standards for plastic parts and business...

  7. 76 FR 10249 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions To Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-24

    ... Control Volatile Organic Compound Emissions From Consumer Related Sources AGENCY: Environmental Protection..., 115.627, and 115.629 of 30 TAC Chapter 115, Control of Air Pollution from Volatile Organic Compounds... reference, Intergovernmental relations, Ozone, Volatile organic compounds. Dated: February 9, 2011....

  8. 77 FR 44204 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control of Iron and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-27

    ... Iron and Steel Production Installations; Sintering Plants AGENCY: Environmental Protection Agency (EPA... revisions amend the visible emissions requirements of the Maryland SIP's regulation for the Control of Iron... the sintering plant from the visible emissions section of the regulation for the Control of Iron...

  9. 77 FR 44146 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control of Iron and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-27

    ... Iron and Steel Production Installations; Sintering Plants AGENCY: Environmental Protection Agency (EPA... for the Control of Iron and Steel Production Installations only as they apply to sintering plants. The... emissions section of the regulation for the Control of Iron and Steel Production Installations...

  10. 75 FR 59179 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... of Control Techniques Guidelines for Flexible Packaging Printing AGENCY: Environmental Protection... flexible packaging printing. These amendments will reduce emissions of volatile organic compound (VOC) emissions from flexible packaging printing. In the Final Rules section of this Federal Register, EPA...

  11. 75 FR 59973 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control of Volatile...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ... Volatile Organic Compound Emissions From Industrial Solvent Cleaning Operations AGENCY: Environmental...). This SIP revision consists of an addition to Maryland's Volatile Organic Compounds from Specific... reasonably available control technology (RACT) requirements for sources of volatile organic compounds...

  12. 75 FR 60013 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control of Volatile...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ... Volatile Organic Compounds Emissions From Industrial Solvent Cleaning Operations AGENCY: Environmental... consists of an addition to Maryland's Volatile Organic Compounds from Specific Processes Regulation... available control techniques (RACT) requirements for sources of volatile organic compounds (VOCs) covered...

  13. 75 FR 72963 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control of Volatile...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... Volatile Organic Compound Emissions From Industrial Solvent Cleaning Operations; Withdrawal of Direct Final... Organic Compounds from Specific Processes Regulation. Maryland Department of the Environment (MDE) adopted... technology (RACT) requirements for sources of volatile organic compounds (VOCs) covered by control...

  14. 76 FR 52283 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Control of Nitrogen...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ...; Control of Nitrogen Oxides Emissions From Glass Melting Furnaces AGENCY: Environmental Protection Agency... (NO X ) emissions from glass melting furnaces. EPA is approving these revisions to reduce NO X emissions from glass melting furnaces in accordance with the requirements of the Clean Air Act (CAA)....

  15. 76 FR 42558 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Control of Nitrogen...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ...; Control of Nitrogen Oxides Emissions from Portland Cement Kilns AGENCY: Environmental Protection Agency... (NO X ) emissions from Portland cement kilns. EPA is approving these revisions to reduce emissions from Portland cement kilns in accordance with the requirements of the Clean Air Act (CAA)....

  16. 76 FR 41742 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Control of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION...; Control of Particulate Matter Emissions From the Operation of Outdoor Wood-Fired Boilers AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a...

  17. 75 FR 59180 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control Technique...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... Technique Guidelines for Paper, Film, and Foil Coatings AGENCY: Environmental Protection Agency (EPA... adopting the requirements of EPA's Control Technique Guidelines (CTG) for paper, film, and foil coatings..., Film, and Foil Coatings,'' that is located in the ``Rules and Regulations'' section of this...

  18. 76 FR 51901 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Control of Emissions of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ... Emissions of Organic Materials That Are Not Regulated by Volatile Organic Compound Reasonably Available... revised rule 3745-21-07, ``Control of emissions of organic materials from stationary sources (i.e... material,'' which is different than the definition of ``volatile organic compounds'' (VOC), upon which...

  19. 75 FR 6307 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control of Carbon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-09

    ... Carbon Monoxide Emissions From Basic Oxygen Furnaces AGENCY: Environmental Protection Agency (EPA... current SIP requirements for the control of carbon monoxide (CO) emissions from basic oxygen furnaces... blast furnace and scrap metal which is heated with oxygen to produce molten metal. The molten metal...

  20. 75 FR 31711 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of Nitrogen...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-04

    ... Heaters at Petroleum Refineries in order to require new and/or additional controls on industrial boilers and process heaters with heat input capacities of equal to or greater than 200 million British thermal... Nitrogen Oxide Emissions From Industrial Boilers and Process Heaters at Petroleum Refineries...

  1. 75 FR 12168 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of Nitrogen...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-15

    ... Nitrogen Oxide Emissions From Industrial Boilers and Process Heaters at Petroleum Refineries AGENCY...--Control of Nitrogen Oxide Emissions from Industrial Boilers and Process Heaters at Petroleum Refineries to... Nitrogen Oxide Emissions from Industrial Boilers and Process Heaters at Petroleum Refineries....

  2. Quality control methodology and implementation of X-radiation standards beams, mammography level, following the standard IEC 61267.

    PubMed

    Corrêa, E L; Vivolo, V; Potiens, M P A

    2012-07-01

    This study presents the results of the establishment of a quality control program developed and applied for the X-ray system of the Calibration Laboratory of IPEN. The X-ray standard beams, mammography level, using molybdenum and aluminum as additional filtration were established after the application of this quality control and the spectrometry of these qualities was made. The reference ionization chamber has traceability to the PTB. The radiation qualities RQR-M, RQA-M, RQN-M and RQB-M, following the recommendations of the IEC 61267 and the IAEA TRS 457 were established.

  3. 78 FR 26300 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to Control of Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... Control of Air Pollution From Nitrogen Compounds From Stationary Sources AGENCY: Environmental Protection... State Implementation Plan (SIP), 30 TAC, Chapter 117 Control of Air Pollution from Nitrogen Compounds... sources of Nitrogen Oxides (NO X ). Second, we are proposing to approve revisions to Texas SIP,...

  4. Development of Real Time Implementation of 5/5 Rule based Fuzzy Logic Controller Shunt Active Power Filter for Power Quality Improvement

    NASA Astrophysics Data System (ADS)

    Puhan, Pratap Sekhar; Ray, Pravat Kumar; Panda, Gayadhar

    2016-12-01

    This paper presents the effectiveness of 5/5 Fuzzy rule implementation in Fuzzy Logic Controller conjunction with indirect control technique to enhance the power quality in single phase system, An indirect current controller in conjunction with Fuzzy Logic Controller is applied to the proposed shunt active power filter to estimate the peak reference current and capacitor voltage. Current Controller based pulse width modulation (CCPWM) is used to generate the switching signals of voltage source inverter. Various simulation results are presented to verify the good behaviour of the Shunt active Power Filter (SAPF) with proposed two levels Hysteresis Current Controller (HCC). For verification of Shunt Active Power Filter in real time, the proposed control algorithm has been implemented in laboratory developed setup in dSPACE platform.

  5. Environmental Restoration Quality Program Implementation Plan

    SciTech Connect

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  6. Total Quality Management (TQM). Implementers Workshop

    DTIC Science & Technology

    1990-05-15

    approaches and methods for planning, organizing, and launching TOM within OSD functions. 1-3 . .. TOTAL QUALITY I Ii N MANAGEMENT Implementers Workshop...TOM Review COMMON THEMES OF TQM EXPERTS - Customer defines quality . - Quality becomes prevention-based. - Team approach to problem-solving...different in approaches , all advocate the quality path to productivity. 2-5 a gg. Z - TOTAL QUALITY J LI VI MANAGEMENT Implementers Workshop TQM Review

  7. [Implementation of quality standard UNE-EN ISO/IEC 17043 in the External Quality Control Program of the Spanish Society of Infectious Diseases and Clinical Microbiology].

    PubMed

    Poveda Gabaldón, Marta; Ovies, María Rosario; Orta Mira, Nieves; Serrano, M del Remedio Guna; Avila, Javier; Giménez, Alicia; Cardona, Concepción Gimeno

    2011-12-01

    The quality standard "UNE-EN-ISO 17043: 2010. Conformity assessment. General requirements for proficiency testing" applies to centers that organize intercomparisons in all areas. In the case of clinical microbiology laboratories, these intercomparisons must meet the management and technical standards required to achieve maximum quality in the performance of microbiological analysis and the preparation of test items (sample, product, data or other information used in the proficiency test) to enable them to be accredited. Once accredited, these laboratories can operate as a tool for quality control laboratories and competency assessment. In Spain, accreditation is granted by the Spanish Accreditation Body [Entidad Nacional de Acreditación (ENAC)]. The objective of this review is to explain how to apply the requirements of the standard to laboratories providing intercomparisons in the field of clinical microbiology (the organization responsible for all the tasks related to the development and operation of a proficiency testing program). This requires defining the scope and specifying the technical requirements (personnel management, control of equipment, facilities and environment, the design of the proficiency testing and data analysis for performance evaluation, communication with participants and confidentiality) and management requirements (document control, purchasing control, monitoring of complaints / claims, non-compliance, internal audits and management reviews).

  8. Quality control in gastrointestinal surgery.

    PubMed

    Ramírez-Barba, Ector Jaime; Arenas-Moya, Diego; Vázquez-Guerrero, Arturo

    2011-01-01

    We analyzed the Mexican legal framework, identifying the vectors that characterize quality and control in gastrointestinal surgery. Quality is contemplated in the health protection rights determined according to the Mexican Constitution, established in the general health law and included as a specific goal in the actual National Development Plan and Health Sector Plan. Quality control implies planning, verification and application of corrective measures. Mexico has implemented several quality strategies such as certification of hospitals and regulatory agreements by the General Salubrity Council, creation of the National Health Quality Committee, generation of Clinical Practice Guidelines and the Certification of Medical Specialties, among others. Quality control in gastrointestinal surgery must begin at the time of medical education and continue during professional activities of surgeons, encouraging multidisciplinary teamwork, knowledge, abilities, attitudes, values and skills that promote homogeneous, safe and quality health services for the Mexican population.

  9. Total quality management implementation guidelines

    SciTech Connect

    Not Available

    1993-12-01

    These Guidelines were designed by the Energy Quality Council to help managers and supervisors in the Department of Energy Complex bring Total Quality Management to their organizations. Because the Department is composed of a rich mixture of diverse organizations, each with its own distinctive culture and quality history, these Guidelines are intended to be adapted by users to meet the particular needs of their organizations. For example, for organizations that are well along on their quality journeys and may already have achieved quality results, these Guidelines will provide a consistent methodology and terminology reference to foster their alignment with the overall Energy quality initiative. For organizations that are just beginning their quality journeys, these Guidelines will serve as a startup manual on quality principles applied in the Energy context.

  10. The influence of fidelity of implementation on teacher-student interaction quality in the context of a randomized controlled trial of the Responsive Classroom approach.

    PubMed

    Abry, Tashia; Rimm-Kaufman, Sara E; Larsen, Ross A; Brewer, Alexis J

    2013-08-01

    This study examined the direct and indirect effects between training in the Responsive Classroom® (RC) approach, teachers' uptake of RC practices, and teacher-student interaction quality, using a structural equation modeling framework. A total of 24 schools were randomly assigned to experimental or control conditions. Third- and fourth-grade teachers in treatment schools (n=132) received training in the RC approach, whereas teachers in control schools (n=107) continued "business as usual." Observers rated teachers' fidelity of implementation (FOI) of RC practices 5 times throughout the year using the Classroom Practices Observation Measure. In addition, teachers completed self-report measures of FOI, the Classroom Practices Teacher Survey and Classroom Practices Frequency Survey, at the end of the school year. Teacher-student interactions were rated during classroom observations using the Classroom Assessment Scoring System. Controlling for teachers' grade level and teacher-student interaction quality at pretest, RC training was expected to predict posttest teacher-student interaction quality directly and indirectly through FOI. Results supported only a significant indirect effect, β=0.85, p=.002. Specifically, RC teachers had higher levels of FOI of RC practices, β=1.62, p<.001, R2=.69. In turn, FOI related to greater improvement in teacher-student interaction quality, β=0.52, p=.001, R2=.32. Discussion highlights factors contributing to variability in FOI and school administrators roles in supporting FOI.

  11. Implementation and Quality Control of Lung Cancer EGFR Genetic Testing by MALDI-TOF Mass Spectrometry in Taiwan Clinical Practice

    PubMed Central

    Su, Kang-Yi; Kao, Jau-Tsuen; Ho, Bing-Ching; Chen, Hsuan-Yu; Chang, Gee-Cheng; Ho, Chao-Chi; Yu, Sung-Liang

    2016-01-01

    Molecular diagnostics in cancer pharmacogenomics is indispensable for making targeted therapy decisions especially in lung cancer. For routine clinical practice, the flexible testing platform and implemented quality system are important for failure rate and turnaround time (TAT) reduction. We established and validated the multiplex EGFR testing by MALDI-TOF MS according to ISO15189 regulation and CLIA recommendation in Taiwan. Totally 8,147 cases from Aug-2011 to Jul-2015 were assayed and statistical characteristics were reported. The intra-run precision of EGFR mutation frequency was CV 2.15% (L858R) and 2.77% (T790M); the inter-run precision was CV 3.50% (L858R) and 2.84% (T790M). Accuracy tests by consensus reference biomaterials showed 100% consistence with datasheet (public database). Both analytical sensitivity and specificity were 100% while taking Sanger sequencing as the gold-standard method for comparison. EGFR mutation frequency of peripheral blood mononuclear cell for reference range determination was 0.002 ± 0.016% (95% CI: 0.000–0.036) (L858R) and 0.292 ± 0.289% (95% CI: 0.000–0.871) (T790M). The average TAT was 4.5 working days and the failure rate was less than 0.1%. In conclusion, this study provides a comprehensive report of lung cancer EGFR mutation detection from platform establishment, method validation to clinical routine practice. It may be a reference model for molecular diagnostics in cancer pharmacogenomics. PMID:27480787

  12. Quality Leadership and Quality Control

    PubMed Central

    Badrick, Tony

    2003-01-01

    Different quality control rules detect different analytical errors with varying levels of efficiency depending on the type of error present, its prevalence and the number of observations. The efficiency of a rule can be gauged by inspection of a power function graph. Control rules are only part of a process and not an end in itself; just as important are the trouble-shooting systems employed when a failure occurs. 'Average of patient normals' may develop as a usual adjunct to conventional quality control serum based programmes. Acceptable error can be based on various criteria; biological variation is probably the most sensible. Once determined, acceptable error can be used as limits in quality control rule systems. A key aspect of an organisation is leadership, which links the various components of the quality system. Leadership is difficult to characterise but its key aspects include trust, setting an example, developing staff and critically setting the vision for the organisation. Organisations also have internal characteristics such as the degree of formalisation, centralisation, and complexity. Medical organisations can have internal tensions because of the dichotomy between the bureaucratic and the shadow medical structures. PMID:18568046

  13. QUALITY CONTROLS FOR PCR

    EPA Science Inventory

    The purpose of this presentation is to present an overview of the quality control (QC) sections of a draft EPA document entitled, "Quality Assurance/Quality Control Guidance for Laboratories Performing PCR Analyses on Environmental Samples." This document has been prepared by th...

  14. 78 FR 26251 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to Control of Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... employment of a NOx control catalyst due to the presence of such substances which can contribute to catalyst... installation and operation of a NOx control catalyst is the basis for the 0.60 g/hp- hr emission standard...

  15. 77 FR 59093 - Approval and Promulgation of Air Quality Implementation Plans; Maryland-Revision for the Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-26

    ... for the Control of Volatile Organic Compounds Emissions From Vehicle Refinishing AGENCY: Environmental...) revision submitted by the State of Maryland pertaining to ``Control of Volatile Organic Compounds Emissions from Vehicle Refinishing.'' The SIP revision establishes new volatile organic compounds (VOC)...

  16. 40 CFR Appendix B to Part 75 - Quality Assurance and Quality Control Procedures

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 16 2011-07-01 2011-07-01 false Quality Assurance and Quality Control... and Quality Control Procedures 1. Quality Assurance/Quality Control Program Develop and implement a quality assurance/quality control (QA/QC) program for the continuous emission monitoring systems,...

  17. 40 CFR Appendix B to Part 75 - Quality Assurance and Quality Control Procedures

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Quality Assurance and Quality Control... and Quality Control Procedures 1. Quality Assurance/Quality Control Program Develop and implement a quality assurance/quality control (QA/QC) program for the continuous emission monitoring systems,...

  18. 40 CFR Appendix B to Part 75 - Quality Assurance and Quality Control Procedures

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Quality Assurance and Quality Control... and Quality Control Procedures 1. Quality Assurance/Quality Control Program Develop and implement a quality assurance/quality control (QA/QC) program for the continuous emission monitoring systems,...

  19. 40 CFR Appendix B to Part 75 - Quality Assurance and Quality Control Procedures

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 17 2014-07-01 2014-07-01 false Quality Assurance and Quality Control... and Quality Control Procedures 1. Quality Assurance/Quality Control Program Develop and implement a quality assurance/quality control (QA/QC) program for the continuous emission monitoring systems,...

  20. Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Starr, Andrew Scott

    2015-01-01

    This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of Building M7-505 of institutional controls that have been implemented at the site. Although there are no current unacceptable risks to human health or the environment associated with Building M7-505, institutional land use controls (LUCs) are necessary to prohibit the use of groundwater from the site. LUCs are also necessary to prevent access to soil under electrical equipment in the northwest portion of the site. Controls necessary to prevent human exposure will include periodic inspection, condition certification, and agency notification.

  1. INSTRUCTIONAL QUALITY CONTROL SYSTEMS.

    ERIC Educational Resources Information Center

    MONROE, BRUCE

    A REVIEW OF THE LITERATURE, A MAIL SURVEY, AND A TEXTUAL ANALYSIS OF JUNIOR COLLEGE DOCUMENTS INDICATE THAT, WHILE CALIFORNIA JUNIOR COLLEGES ARE CONCERNED ABOUT THE QUALITY AND EFFECTIVENESS OF INSTRUCTION, CONTROL OF THAT QUALITY IS RARELY A SYSTEMATIC ROUTINE ENTERPRISE BASED ON EXAMINATION OF BEHAVIOR CHANGES IN STUDENTS FOLLOWING INSTRUCTION.…

  2. Accomplished Teachers Implementation of Quality Teaching Practices

    ERIC Educational Resources Information Center

    Chen, Weiyun; Hammond-Bennett, Austin; Upton, Ashely; Mason, Steve

    2014-01-01

    The purpose of this study was to describe how accomplished teachers implement the quality of teaching practices in their daily lessons. The participants were four elementary physical education teachers (one male, three female). The data sources consisted of videotape of the teachers teaching 12 lessons, transcription of the taped lessons,…

  3. Diamond turning machine controller implementation

    SciTech Connect

    Garrard, K.P.; Taylor, L.W.; Knight, B.F.; Fornaro, R.J.

    1988-12-01

    The standard controller for a Pnuemo ASG 2500 Diamond Turning Machine, an Allen Bradley 8200, has been replaced with a custom high-performance design. This controller consists of four major components. Axis position feedback information is provided by a Zygo Axiom 2/20 laser interferometer with 0.1 micro-inch resolution. Hardware interface logic couples the computers digital and analog I/O channels to the diamond turning machine`s analog motor controllers, the laser interferometer, and other machine status and control information. It also provides front panel switches for operator override of the computer controller and implement the emergency stop sequence. The remaining two components, the control computer hardware and software, are discussed in detail below.

  4. Instrument Quality Control.

    PubMed

    Jayakody, Chatura; Hull-Ryde, Emily A

    2016-01-01

    Well-defined quality control (QC) processes are used to determine whether a certain procedure or action conforms to a widely accepted standard and/or set of guidelines, and are important components of any laboratory quality assurance program (Popa-Burke et al., J Biomol Screen 14: 1017-1030, 2009). In this chapter, we describe QC procedures useful for monitoring the accuracy and precision of laboratory instrumentation, most notably automated liquid dispensers. Two techniques, gravimetric QC and photometric QC, are highlighted in this chapter. When used together, these simple techniques provide a robust process for evaluating liquid handler accuracy and precision, and critically underpin high-quality research programs.

  5. Using E-WorkBook Suite to implement quality control in real time: expanding the role of electronic laboratory notebooks within a bioanalysis laboratory.

    PubMed

    Rajarao, Joe; Weiss, Scott

    2011-07-01

    In order to support the increasing number of software tools within the bioanalytical (BA) laboratory, electronic laboratory notebooks (ELNs) have to provide more than just paper replacement capabilities. ELN solutions must provide additional functionality to justify deployment in BA laboratories that currently depend on sophisticated instrument software and laboratory information management systems for the capture, analysis and reporting of data. This article reviews how E-WorkBook Suite is positioned to provide functionality not found in other ELN solutions, namely managing workflow execution and tracking quality control compliance in real time. These capabilities are demonstrated by descriptions of a routine BA laboratory process; the registration of a test article, its use in preparing a stock solution and the verification of a balance instrument for weighing the test article. The software solution, in this configuration, guides the analyst through the process and enforces business rules that ensure compliance with specified SOP guidelines. This case study reviews the implementation in a bioanalytical CRO and highlights the use of E-WorkBook Suite in areas that remain unsupported by other software solutions.

  6. Sampled-data controller implementation

    NASA Astrophysics Data System (ADS)

    Wang, Yu; Leduc, Ryan J.

    2012-09-01

    The setting of this article is the implementation of timed discrete-event systems (TDES) as sampled-data (SD) controllers. An SD controller is driven by a periodic clock and sees the system as a series of inputs and outputs. On each clock edge (tick event), it samples its inputs, changes states and updates its outputs. In this article, we establish a formal representation of an SD controller as a Moore synchronous finite state machine (FSM). We describe how to translate a TDES supervisor to an FSM, as well as necessary properties to be able to do so. We discuss how to construct a single centralised controller as well as a set of modular controllers, and show that they will produce equivalent output. We briefly discuss how the recently introduced SD controllability definition relates to our translation method. SD controllability is an extension of TDES controllability which captures several new properties that are useful in dealing with concurrency issues, as well as make it easier to translate a TDES supervisor into an SD controller. We next discuss the application of SD controllability to a small flexible manufacturing system (FMS) from the literature. The example demonstrates the successful application of the new SD properties. We describe the design of the system in detail to illustrate the new conditions and to provide designers with guidance on how to apply the properties. We also present some FSM translation issues encountered, as well as the FSM version of the system's supervisors.

  7. SIMBAD Quality-Control

    NASA Astrophysics Data System (ADS)

    Lesteven, Soizick

    1993-01-01

    Taking into consideration the amount and the complexity of SIMBAD data, it is necessary to use automatic methods to control and assure the quality of the SIMBAD database. One possibility is to apply multivariate data analysis to the content of documents related to astronomical data. The method and first results are presented.

  8. Program for implementing software quality metrics

    SciTech Connect

    Yule, H.P.; Riemer, C.A.

    1992-04-01

    This report describes a program by which the Veterans Benefit Administration (VBA) can implement metrics to measure the performance of automated data systems and demonstrate that they are improving over time. It provides a definition of quality, particularly with regard to software. Requirements for management and staff to achieve a successful metrics program are discussed. It lists the attributes of high-quality software, then describes the metrics or calculations that can be used to measure these attributes in a particular system. Case studies of some successful metrics programs used by business are presented. The report ends with suggestions on which metrics the VBA should use and the order in which they should be implemented.

  9. 77 FR 235 - Approval and Promulgation of Air Quality Implementation Plans; Colorado; Procedural Rules...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-04

    ... Quality Control Commission (Commission) on January 16, 1998 and submitted to EPA as a State Implementation..., unless the context indicates otherwise. (v) The word Commission means the Colorado Air Quality Control... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Colorado;...

  10. 78 FR 34964 - Implementation of the 2008 National Ambient Air Quality Standards for Ozone: State Implementation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... for Ozone: State Implementation Plan Requirements AGENCY: Environmental Protection Agency (EPA... proposed rule ``Implementation of the 2008 National Ambient Air Quality Standards for Ozone: State... proposed rulemaking proposes to implement the 2008 ozone national ambient air quality standards...

  11. 78 FR 34177 - Implementation of the 2008 National Ambient Air Quality Standards for Ozone: State Implementation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... the 2008 National Ambient Air Quality Standards for Ozone: State Implementation Plan Requirements... Ambient Air Quality Standards for Ozone: State Implementation Plan Requirements AGENCY: Environmental... 2008 ozone national ambient air quality standards (NAAQS) (the ``2008 ozone NAAQS'') that...

  12. Implementation

    EPA Pesticide Factsheets

    Describes elements for the set of activities to ensure that control strategies are put into effect and that air quality goals and standards are fulfilled, permitting programs, and additional resources related to implementation under the Clean Air Act.

  13. Quality Control of Meteorological Observations

    NASA Technical Reports Server (NTRS)

    Collins, William; Dee, Dick; Rukhovets, Leonid

    1999-01-01

    For the first time, a problem of the meteorological observation quality control (QC) was formulated by L.S. Gandin at the Main Geophysical Observatory in the 70's. Later in 1988 L.S. Gandin began adapting his ideas in complex quality control (CQC) to the operational environment at the National Centers for Environmental Prediction. The CQC was first applied by L.S.Gandin and his colleagues to detection and correction of errors in rawinsonde heights and temperatures using a complex of hydrostatic residuals.Later, a full complex of residuals, vertical and horizontal optimal interpolations and baseline checks were added for the checking and correction of a wide range of meteorological variables. some other of Gandin's ideas were applied and substantially developed at other meteorological centers. A new statistical QC was recently implemented in the Goddard Data Assimilation System. The central component of any quality control is a buddy check which is a test of individual suspect observations against available nearby non-suspect observations. A novel feature of this test is that the error variances which are used for QC decision are re-estimated on-line. As a result, the allowed tolerances for suspect observations can depend on local atmospheric conditions. The system is then better able to accept extreme values observed in deep cyclones, jet streams and so on. The basic statements of this adaptive buddy check are described. Some results of the on-line QC including moisture QC are presented.

  14. 75 FR 24406 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... Control District, Sacramento Metropolitan Air Quality Management District, San Joaquin Valley Unified Air Pollution Control District, and South Coast Air Quality Management District AGENCY: Environmental Protection... Coast Air Quality Management District (SCAQMD) portions of the California State Implementation Plan...

  15. Pilot Implementation of a Field Study Design to Evaluate the Impact of Source Control Measures on Indoor Air Quality in High Performance Homes

    SciTech Connect

    Widder, Sarah H.; Chamness, Michele A.; Petersen, Joseph M.; Singer, Brett C.; Maddalena, Randy L.; Destaillats, Hugo; Russell, M. L.

    2014-10-01

    -emitting and “conventional” materials as installed in newly constructed residential homes using both (1) highly controlled, short-term active samples to precisely characterize the building-related chemical emissions and building contents and (2) a week-long passive sample designed to capture the impact of occupant behavior and related activities on measured IAQ contaminant levels indoors. The combination of detailed short-term measurements with the home under controlled/consistent conditions during pre- and post-occupancy and the week-long passive sampling data provide the opportunity to begin to separate the different emission sources and help isolate and quantify variability in the monitored homes. Between April and August 2014, the research team performed pre-occupancy and post-occupancy sampling in one conventional home and two homes built with low-emitting materials that were generally consistent with EPA’s Indoor airPLUS guidelines. However, for a number of reasons, the full experimental plan was not implemented. The project was intended to continue for up to three years to asses long-term changes in IAQ but the project was limited to one calendar year. As a result, several of the primary research questions related to seasonal impacts and the long-term trends in IAQ could not be addressed. In addition, there were several unexpected issues related to recruiting, availability of home types, and difficulty coordinating with builders/realtors/homeowners. Several field monitoring issues also came up that provide “lessons learned” that led to improvements to the original monitoring plan. The project produced a good experimental plan that is expected to be be useful for future efforts collecting data to support answering these same or similar research questions.

  16. Development and implementation of the quality control panel of RT-PCR and real-time RT-PCR for avian influenza A (H5N1) surveillance network in mainland China

    PubMed Central

    2011-01-01

    Background Reverse transcription PCR (RT-PCR) and real time RT-PCR (rRT-PCR) have been indispensable methods for influenza surveillance, especially for determination of avian influenza. The movement of testing beyond reference lab introduced the need of quality control, including the implementation of an evaluation system for validating personal training and sample proficiency testing. Methods We developed a panel with lysates of seasonal influenza virus (H1N1, H3N2 and B), serials of diluted H5N1 virus lysates, and in-vitro transcribed H5 hemaglutinin (HA) and an artificial gene RNAs for RT-PCR and rRT-PCR quality control assessment. The validations of stability and reproducibility were performed on the panel. Additionally, the panel was implemented to assess the detection capability of Chinese human avian influenza networks. Results The panel has relatively high stability and good reproducibility demonstrated by kappa's tests. In the implementation of panel on Chinese human avian influenza networks, the results suggested that there were a relatively low number of discrepancies for both concise and reproducibility in Chinese avian influenza virus net works. Conclusions A quality control panel of RT-PCR and real-time RT-PCR for avian influenza A (H5N1) surveillance network was developed. An availably statistical data, which are used to assess the detection capability of networks on avian influenza virus (H5N1), can be obtained relatively easily through implementation of the panel on networks. PMID:21406119

  17. 77 FR 76867 - Approval and Promulgation of Air Quality Implementation Plans; New York, New Jersey, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ... implementation of control measures, or air quality, in the area. Table 1 shows the design values by county (i.e... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; New York, New Jersey... for the 2006 24-hour PM 2.5 National Ambient Air Quality Standard (NAAQS) has attained the 2006...

  18. ISO 17025: practical benefits of implementing a quality system.

    PubMed

    Honsa, Julie D; McIntyre, Deborah A

    2003-01-01

    As a laboratory certified to ISO 9001:2000 and accredited to ISO 17025, rtech laboratories has incorporated an overall system for technical and quality management, which results in benefits observed in daily laboratory practices. Technical requirements were updated to include the addition of formal personnel training plans and detailed records, method development and validation procedures, measurement of method uncertainty, and a defined equipment calibration and maintenance program. In addition, a stronger definition of the sample preparation process was documented to maintain consistency in sampling, and a more rigorous quality control monitoring program was implemented for chemistry and microbiology. Management quality improvements focused on document control to maintain consistent analytical processes, improved monitoring of supplier performance, a contract review process for documenting customer requirements, and a system for handling customer comments and complaints, with continuous improvement through corrective and preventive action procedures and audits. Quarterly management review of corrective actions, nonconforming testing, and proficiency testing aid in determining long-term trending. The practical benefits of these technical and management quality improvements are seen on a daily basis in the laboratory. Faster identification and resolution of issues regarding methods, personnel or equipment, improved customer satisfaction, meeting quality requirements of specialized customers, and overall increased laboratory business are all the result of implementing an effective quality system.

  19. Internal quality control: best practice.

    PubMed

    Kinns, Helen; Pitkin, Sarah; Housley, David; Freedman, Danielle B

    2013-12-01

    There is a wide variation in laboratory practice with regard to implementation and review of internal quality control (IQC). A poor approach can lead to a spectrum of scenarios from validation of incorrect patient results to over investigation of falsely rejected analytical runs. This article will provide a practical approach for the routine clinical biochemistry laboratory to introduce an efficient quality control system that will optimise error detection and reduce the rate of false rejection. Each stage of the IQC system is considered, from selection of IQC material to selection of IQC rules, and finally the appropriate action to follow when a rejection signal has been obtained. The main objective of IQC is to ensure day-to-day consistency of an analytical process and thus help to determine whether patient results are reliable enough to be released. The required quality and assay performance varies between analytes as does the definition of a clinically significant error. Unfortunately many laboratories currently decide what is clinically significant at the troubleshooting stage. Assay-specific IQC systems will reduce the number of inappropriate sample-run rejections compared with the blanket use of one IQC rule. In practice, only three or four different IQC rules are required for the whole of the routine biochemistry repertoire as assays are assigned into groups based on performance. The tools to categorise performance and assign IQC rules based on that performance are presented. Although significant investment of time and education is required prior to implementation, laboratories have shown that such systems achieve considerable reductions in cost and labour.

  20. Quality Assurance and Quality Control, Part 1.

    PubMed

    Akers, Michael J

    2015-01-01

    The tragedy surrounding the New England Compounding Center and contaminated steroid syringe preparations clearly points out what can happen if quality-assurance and quality-control procedures are not strictly practiced in the compounding of sterile preparations. This article represents part 1 of a 2-part article on quality-assurance and quality-control procedures and serves as an introduction to the topic of finished preparation release checks and tests. Part 1 highlights what is required to comply with United States Pharmacopeia General Chapter <797>, and part 2 continues with a discussion on the requirements of <797> as well as what is required in chapter < 1163> with respect to quality assurance of compounded sterile preparations. Written procedures, good documentation practices, and specific details for clarity, sterility, and bacterial endotoxin (pyrogen) testing are presented in this article.

  1. 78 FR 8485 - Approval and Promulgation of Air Quality Implementation Plans; Michigan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Michigan AGENCY... control), R336.1240 (Required air quality models), R336.1241 (Air quality modeling demonstration... nonattainment air quality permitting regulations found in 40 CFR 51.165(a) and (b). EPA has found that the...

  2. Environmental Restoration Quality Program Implementation Plan. Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  3. 77 FR 32493 - Approval of Air Quality Implementation Plans; California; San Joaquin Valley Unified Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... AGENCY 40 CFR Part 52 Approval of Air Quality Implementation Plans; California; San Joaquin Valley Unified Air Pollution Control District; Prevention of Significant Deterioration AGENCY: Environmental... submitted for the San Joaquin Valley Unified Air Pollution Control District (District) portion of...

  4. 78 FR 58459 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management... Quality Management District (SCAQMD) and Ventura County Air Pollution Control District (VCAPCD)...

  5. 78 FR 25011 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management... Quality Management District (SCAQMD) and Ventura County Air Pollution Control District (VCAPCD)...

  6. 77 FR 58955 - Approval and Promulgation of Air Quality Implementation Plans; Commonwealth of Pennsylvania...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... available at the Pennsylvania Department of Environmental Protection, Bureau of Air Quality Control, P.O... address the section 110(a)(2)(G) element, states with air quality control regions identified as either... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Commonwealth...

  7. SIMBAD quality-control

    NASA Technical Reports Server (NTRS)

    Lesteven, Soizick

    1992-01-01

    The astronomical database SIMBAD developed at the Centre de donnees astronomiques de Strasbourg presently contains 760,000 objects (stellar and non-stellar). It has the unique characteristic of being structured specifically for astronomical objects. All types of heterogeneous data (bibliographic references, measurements, and sets of identification) are connected with each object. The attributes that define quality of the database include the following. Reliability: cross-identification should not rely upon just exact values object coordinates. It also means that information attached to one simple object should be consistent. The existing data must be controlled in order to start with a reliable base and to cross-identify new data assuring the quality as data grows. Exhaustivity: delays between publication of new informations and their inclusion in the database should be as short as possible. The integrity of the database has to be maintained as data accumulates. Taking the amount of data into consideration and the rate of new data production, it is necessary to use automatic methods. One of the possibilities is to use multivariate data analysis. The factor-space is a n-dimensional relevancy space which is described by the n-axes representing a set of n subject matter headings; the words and phrases can be used to scale the axes and the documents are then a vector average of the terms within them. The application reported herein is based on the NASA-STI bibliographical database. The selected data concern astronomy, astrophysics, and space radiation (102,963 references from 1975 to 1991 included 8070 keywords). The F-space is built from this bibliographical data. By comparing the F-space position obtained from the NASA-STI keywords with the F-space position obtained from the SIMBAD references, the authors will be able to show whether it is possible to retrieve information with a restricted set of words only. If the comparison is valid, this will be a way to enter

  8. Posttranslational modification and quality control.

    PubMed

    Wang, Xuejun; Pattison, J Scott; Su, Huabo

    2013-01-18

    Protein quality control functions to minimize the level and toxicity of misfolded proteins in the cell. Protein quality control is performed by intricate collaboration among chaperones and target protein degradation. The latter is performed primarily by the ubiquitin-proteasome system and perhaps autophagy. Terminally misfolded proteins that are not timely removed tend to form aggregates. Their clearance requires macroautophagy. Macroautophagy serves in intracellular quality control also by selectively segregating defective organelles (eg, mitochondria) and targeting them for degradation by the lysosome. Inadequate protein quality control is observed in a large subset of failing human hearts with a variety of causes, and its pathogenic role has been experimentally demonstrated. Multiple posttranslational modifications can occur to substrate proteins and protein quality control machineries, promoting or hindering the removal of the misfolded proteins. This article highlights recent advances in posttranslational modification-mediated regulation of intracellular quality control mechanisms and its known involvement in cardiac pathology.

  9. Noninvasive Quality Control of Cryopreserved Samples.

    PubMed

    Dörr, Daniel; Stracke, Frank; Zimmermann, Heiko

    2012-12-01

    We present a novel noninvasive technology for quality control in biobanking. We implemented a contactless optical in situ method with a remote detection unit. The method detects physical and chemical changes by emission spectroscopy. In the present study, ice formation in a vitrified sample is revealed by Raman scattering. The technology allows us to monitor sample quality during cold storage and to assess the sample state after preservation, storage, or transport without the need for thawing.

  10. General aviation fuel quality control

    NASA Technical Reports Server (NTRS)

    Poitz, H.

    1983-01-01

    Quality control measures for aviation gasoline, and some of the differences between quality control on avgas and mogas are discussed. One thing to keep in mind is that with motor gasoline you can always pull off to the side of the road. It's not so easy to do in an airplane. Consequently, there are reasons for having the tight specifications and the tight quality control measures on avgas as compared to motor gasoline.

  11. 78 FR 7703 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    .... SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District (SCAQMD... designed to implement the 2003 Air Quality Management Plan (AQMP) control measure, WST-01, and establish... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  12. [Quality control in molecular microbiology].

    PubMed

    Orta Mira, Nieves; Guna Serrano, María Remedio; Gimeno Cardona, Concepción; Pérez, José L

    2008-07-01

    The term quality assurance (QA) refers to the quality control activities related to analytical procedures performed in the clinical microbiology laboratory. QA should include both external and internal quality assessment. Application of quality control tools in molecular microbiology assays is crucial to ensure the accuracy of results and appropriate patient management. External quality control is used for laboratory intercomparisons, detection of random and systematic errors, evaluation of the suitability of some reagents or commercial diagnostic kits, and continuing education. The External Quality Control Program of the Spanish Society of Infectious Diseases and Clinical Microbiology includes quality control procedures for molecular microbiology, as well as specific programs for quantitative determination of the viral load of human immunodeficiency virus type 1 (HIV-1) and hepatitis C virus (HCV), two highly important molecular markers in clinical settings due to their prognostic value and utility as a treatment guide. Internal quality control allows random and systematic errors to be detected through the inclusion of quality control samples in the assays performed in the laboratory, equipment monitoring, and audit. Evaluation of all molecular microbiology assays before their inclusion in the daily routine work of the laboratory is of utmost importance.

  13. The HERITAGE Family Study: quality assurance and quality control.

    PubMed

    Gagnon, J; Province, M A; Bouchard, C; Leon, A S; Skinner, J S; Wilmore, J H; Rao, D C

    1996-11-01

    The HERITAGE (HEalth, RIsk factors, exercise Training And GEnetics) Family Study is the first multicenter family clinical trial of its kind. Conducted by a consortium of five universities in the United States and Canada, the study has as its primary goal to document the role of the genotype in the cardiovascular, metabolic, and hormonal responses to aerobic exercise training. A comprehensive protocol was implemented at four Clinical Centers (CC) for the generation of data on sedentary subjects. This group included 450 caucasians from 90 nuclear families (father, mother, three children) and 200 black subjects from 40 to 100 family units over a 5-year period. The entire family was tested before and after a 20-week exercise training program. The fifth participating center, the Data Coordinating Center (DCC), is responsible for data management and data analysis. A Consortium Coordinating Center (CCC) responsible for the overall coordination and direction of the study was established at the Quebec CC. Quality assurance and quality control are jointly coordinated by the CCC and the DCC. A multicenter study of this magnitude requires careful standardization of all procedures and constant monitoring of quality control at all levels of operation. This report describes the quality assurance and quality control measures implemented in the HERITAGE Family Study, including some examples with real data.

  14. 10 CFR 26.167 - Quality assurance and quality control.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Quality assurance and quality control. 26.167 Section 26... Department of Health and Human Services § 26.167 Quality assurance and quality control. (a) Quality assurance... calibrators and controls. (c) Quality control requirements for performing initial and confirmatory...

  15. 10 CFR 26.167 - Quality assurance and quality control.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Quality assurance and quality control. 26.167 Section 26... Department of Health and Human Services § 26.167 Quality assurance and quality control. (a) Quality assurance... calibrators and controls. (c) Quality control requirements for performing initial and confirmatory...

  16. 10 CFR 26.167 - Quality assurance and quality control.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Quality assurance and quality control. 26.167 Section 26... Department of Health and Human Services § 26.167 Quality assurance and quality control. (a) Quality assurance... calibrators and controls. (c) Quality control requirements for performing initial and confirmatory...

  17. 10 CFR 26.167 - Quality assurance and quality control.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Quality assurance and quality control. 26.167 Section 26... Department of Health and Human Services § 26.167 Quality assurance and quality control. (a) Quality assurance... calibrators and controls. (c) Quality control requirements for performing initial and confirmatory...

  18. 10 CFR 26.167 - Quality assurance and quality control.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Quality assurance and quality control. 26.167 Section 26... Department of Health and Human Services § 26.167 Quality assurance and quality control. (a) Quality assurance... calibrators and controls. (c) Quality control requirements for performing initial and confirmatory...

  19. FASTQ quality control dashboard

    SciTech Connect

    2016-07-25

    FQCDB builds up existing open source software, FastQC, implementing a modern web interface for across parsed output of FastQC. In addition, FQCDB is extensible as a web service to include additional plots of type line, boxplot, or heatmap, across data formatted according to guidelines. The interface is also configurable via more readable JSON format, enabling customization by non-web programmers.

  20. Quality Implementation in Transition: A Framework for Specialists and Administrators.

    ERIC Educational Resources Information Center

    Wald, Judy L.; Repetto, Jeanne B.

    1995-01-01

    Quality Implementation in Transition is a framework designed to guide transition specialists and administrators in the implementation of total quality management. The framework uses the tenets set forth by W. Edwards Deming and is intended to help professionals facilitate change within transition programs. (Author/JOW)

  1. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-10

    ... AGENCY 40 CFR Part 52 Approval of Air Quality Implementation Plans; California; South Coast Air Quality... Air Quality Management District regarding specific implementation of parts of the Prevention of Significant Deterioration program. (i) Incorporation by reference. (A) South Coast Air Quality...

  2. 76 FR 32333 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Revision to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-06

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Revision to the Inspection and Maintenance (I/M) Program--Quality Assurance Protocol for the Safety... Department of Environmental Protection, Bureau of Air Quality Control, P.O. Box 8468, 400 Market...

  3. Implementation of quality systems by Mexican exporters of processed meat.

    PubMed

    Maldonado-Siman, E; Bernal-Alcántara, R; Cadena-Meneses, J A; Altamirano-Cárdenas, J R; Martinez-Hernández, P A

    2014-12-01

    Requirements of hazard analysis and critical control points (HACCP) are becoming essential for international trade in food commodities as a safety assurance component. This research reports the level of the adoption of ISO 9000 and the HACCP system by Federal Inspection Type (TIF) pork-exporting enterprises. Implementation and operating costs are reported as well as the benefits involved in this food industry process. In Mexico, there are 97 companies classified as TIF enterprises, and 22 are registered as exporters of processed pork with the National Services for Safety and Quality and Animal Health of the Secretariat of Agriculture, Livestock, Rural Development, Fisheries and Food. Surveys were administered to 22 companies, with a 95.2% response rate. Enterprise characteristics were evaluated, as well as their operating activities. Fieldwork consisted of administering structured questionnaires to TIF exporters. All the surveyed enterprises had implemented HACCP, whereas the ISO 9000 regulation was applied in only 30%. Of total production, 75% is exported to 13 countries, and 25% goes to the Mexican market niche. Results indicate that the main factors for adopting HACCP are related to accessibility to international markets, improving quality, and reducing product quality audits by customers. The results also indicated that staff training was the most important issue. Microbiological testing was the highest cost of the operation. The main benefits reported were related to better access to international markets and a considerable reduction in microbial counts. This study shows the willingness of Mexican pork processors to implement food safety protocols for producing safe and quality products to compete in the international food trade.

  4. 78 FR 10589 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District; Stationary Source Permits AGENCY: Environmental Protection Agency... by California as a revision to the Sacramento Metropolitan Air Quality Management District (SMAQMD...

  5. 78 FR 53270 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District; Stationary Source Permits AGENCY: Environmental Protection Agency... permitting rules submitted by California as a revision to the Sacramento Metropolitan Air Quality...

  6. 10 CFR 26.137 - Quality assurance and quality control.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Quality assurance and quality control. 26.137 Section 26....137 Quality assurance and quality control. (a) Quality assurance program. Each licensee testing... metabolites. (b) Performance testing and quality control requirements for validity screening tests....

  7. 10 CFR 26.137 - Quality assurance and quality control.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Quality assurance and quality control. 26.137 Section 26....137 Quality assurance and quality control. (a) Quality assurance program. Each licensee testing... metabolites. (b) Performance testing and quality control requirements for validity screening tests....

  8. 10 CFR 26.137 - Quality assurance and quality control.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Quality assurance and quality control. 26.137 Section 26....137 Quality assurance and quality control. (a) Quality assurance program. Each licensee testing... metabolites. (b) Performance testing and quality control requirements for validity screening tests....

  9. 10 CFR 26.137 - Quality assurance and quality control.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Quality assurance and quality control. 26.137 Section 26....137 Quality assurance and quality control. (a) Quality assurance program. Each licensee testing... metabolites. (b) Performance testing and quality control requirements for validity screening tests....

  10. 10 CFR 26.137 - Quality assurance and quality control.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Quality assurance and quality control. 26.137 Section 26....137 Quality assurance and quality control. (a) Quality assurance program. Each licensee testing... metabolites. (b) Performance testing and quality control requirements for validity screening tests....

  11. Control by quality: proposition of a typology.

    PubMed

    Pujo, P; Pillet, M

    The application of Quality tools and methods in industrial management has always had a fundamental impact on the control of production. It influences the behavior of the actors concerned, while introducing the necessary notions and formalizations, especially for production systems with little or no automation, which constitute a large part of the industrial activity. Several quality approaches are applied in the workshop and are implemented at the level of the control. In this paper, the authors present a typology of the various approaches that have successively influenced control, such as statistical process control, quality assurance, and continuous improvement. First the authors present a parallel between production control and quality organizational structure. They note the duality between control, which is aimed at increasing productivity, and quality, which aims to satisfy the needs of the customer. They also note the hierarchical organizational structure of these two systems of management with, at each level, the notion of a feedback loop. This notion is fundamental to any kind of decision making. The paper is organized around the operational, tactical, and strategic levels, by describing for each level the main methods and tools for control by quality. The overview of these tools and methods starts at the operational level, with the Statistical Process Control, the Taguchi technique, and the "six sigma" approach. On the tactical level, we find a quality system approach, with a documented description of the procedures introduced in the firm. The management system can refer here to Quality Assurance, Total Productive Maintenance, or Management by Total Quality. The formalization through procedures of the rules of decision governing the process control enhances the validity of these rules. This leads to the enhancement of their reliability and to their consolidation. All this counterbalances the human, intrinsically fluctuating, behavior of the control

  12. 78 FR 63877 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ...; Infrastructure Requirements for the 2010 Nitrogen Dioxide National Ambient Air Quality Standards AGENCY... elements of the Clean Air Act (CAA), necessary to implement, maintain, and enforce the 2010 nitrogen... Environmental protection, Air pollution control, Incorporation by reference, Nitrogen dioxide, Reporting...

  13. Quality Control by Artificial Vision

    SciTech Connect

    Lam, Edmond Y.; Gleason, Shaun Scott; Niel, Kurt S.

    2010-01-01

    Computational technology has fundamentally changed many aspects of our lives. One clear evidence is the development of artificial-vision systems, which have effectively automated many manual tasks ranging from quality inspection to quantitative assessment. In many cases, these machine-vision systems are even preferred over manual ones due to their repeatability and high precision. Such advantages come from significant research efforts in advancing sensor technology, illumination, computational hardware, and image-processing algorithms. Similar to the Special Section on Quality Control by Artificial Vision published two years ago in Volume 17, Issue 3 of the Journal of Electronic Imaging, the present one invited papers relevant to fundamental technology improvements to foster quality control by artificial vision, and fine-tuned the technology for specific applications. We aim to balance both theoretical and applied work pertinent to this special section theme. Consequently, we have seven high-quality papers resulting from the stringent peer-reviewing process in place at the Journal of Electronic Imaging. Some of the papers contain extended treatment of the authors work presented at the SPIE Image Processing: Machine Vision Applications conference and the International Conference on Quality Control by Artificial Vision. On the broad application side, Liu et al. propose an unsupervised texture image segmentation scheme. Using a multilayer data condensation spectral clustering algorithm together with wavelet transform, they demonstrate the effectiveness of their approach on both texture and synthetic aperture radar images. A problem related to image segmentation is image extraction. For this, O'Leary et al. investigate the theory of polynomial moments and show how these moments can be compared to classical filters. They also show how to use the discrete polynomial-basis functions for the extraction of 3-D embossed digits, demonstrating superiority over Fourier

  14. [Quality control of plant extract].

    PubMed

    Shao, Yun-dong; Gao, Wen-yuan; Liu, Dan; Jia, Wei; Duan, Hong-Quan; Zhang, Tie-jun

    2003-10-01

    The current situation of plant extract in domestic and international market was analyzed in the paper. The quality control of 20 plant extracts which have reasonably good sales in USA market was compared and analyzed. The analysis of the quality control of six plant extracts indicated that there were two main reasons leading to the varied quality specifications among different suppliers. One reason was that the plant species utilized by different companies were different. The other reason was that the extraction processes were different among different production plants. Comparing with the significant international suppliers of plant extracts, the product quality of Chinese companies were not satisfactory. It was suggested that chromatography and chromatographic fingerprint techniques should be applied to improve the quality control standard of plant extract in our country.

  15. Quality control of radiant heaters

    NASA Astrophysics Data System (ADS)

    González, Daniel A.; Madruga, Francisco J.; Quintela, María Á.; López-Higuera, José M.

    2005-09-01

    Based on infrared thermography, a non-destructive testing and evaluation (NDT&E) procedure is proposed for defects assessment on radiant heaters. Under a short electrical excitation, an infrared camera captures the cooling process of the heaters. Breaking the thermographic images down not only makes easiest the location of defects but it also allows their classification. Several kinds of defects have been taken into account: lack of supporting brackets; defects originated by a deficiency in the heating material; those from an excess of heating material; and those parts of the heating elements which are in wrong contact (non-contact or semi-buried) with the substrate. Each kind of analyzed defect has a different thermal history after the electrical excitation because of its nature. By means of computer vision techniques, the defects can be spatially located. The "chain code" was employed to follow the pattern of the heating element and so concentrate the analysis in points belonging to the pattern. A good agreement with analysis made under human's criteria is achieved. However, using infrared cameras and processing the data with computer vision algorithms allows controlling in-site the quality of the product without any subjectivity. So, the heaters manufacturing industry could come along with the implementation of this automatic detection procedure. Experimental results that validate the proposed method will be presented and discussed in this paper.

  16. 78 FR 49992 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... Quality Management District (AVAQMD) and Ventura County Air Pollution Control District (VCAPCD) portions... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air Pollution Control District AGENCY: Environmental Protection...

  17. 77 FR 28338 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Reasonably Available...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-14

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; Reasonably Available Control Technology for the 1997 8-Hour Ozone National Ambient Air Quality Standard AGENCY... for meeting reasonably available control technology (RACT) for the 1997 8-hour ozone national...

  18. 77 FR 3144 - Approval and Promulgation of Air Quality Implementation Plans; Missouri; Reasonably Available...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-23

    ...; FRL-9621-1] Approval and Promulgation of Air Quality Implementation Plans; Missouri; Reasonably Available Control Technology (RACT) for the 8-Hour Ozone National Ambient Air Quality Standard (NAAQS... approve these revisions because they enhance the Missouri SIP by improving VOC emission controls...

  19. 78 FR 45112 - Approval and Promulgation of Air Quality Implementation Plans; Missouri; Reasonably Available...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Missouri; Reasonably Available Control Technology (RACT) for the 8-Hour Ozone National Ambient Air Quality Standard (NAAQS... dated May 4, 2012. The purpose of the SIP revision is to amend Missouri's regulation for the Control...

  20. 77 FR 41278 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Reasonably Available...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; Reasonably Available Control Technology for the 1997 8-Hour Ozone National Ambient Air Quality Standard AGENCY... meeting reasonably available control technology (RACT) for oxides of nitrogen (NO X ) and volatile...

  1. 77 FR 14691 - Approval and Promulgation of Air Quality Implementation Plans; Rhode Island; Reasonably Available...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-13

    ... declarations for the Plan for the 8-Hour Ozone page number following Control National Ambient Air Quality where... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Rhode Island; Reasonably Available Control Technology (RACT) for the 1997 8-Hour Ozone Standard AGENCY:...

  2. Interim Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2014-01-01

    This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  3. Implementing a High Quality Naptime Routine

    ERIC Educational Resources Information Center

    Button, Lana

    2008-01-01

    Naptime is designed to allow children to physically rest and emotionally unwind. It is a time of day where the "care" in child care really comes into play. But the reality is that naptime in a child care center is often a part of the daily schedule that children and staff both dread. This article presents some tips for planning and implementing a…

  4. Design and implementation air quality monitoring robot

    NASA Astrophysics Data System (ADS)

    Chen, Yuanhua; Li, Jie; Qi, Chunxue

    2017-01-01

    Robot applied in environmental protection can break through the limitations in working environment, scope and mode of the existing environmental monitoring and pollution abatement equipments, which undertake the innovation and improvement in the basin, atmosphere, emergency and pollution treatment facilities. Actually, the relevant technology is backward with limited research and investment. Though the device companies have achieved some results in the study on the water quality monitoring, pipeline monitoring and sewage disposal, this technological progress on the whole is still much slow, and the mature product has not been formed. As a result, the market urges a demand of a new type of device which is more suitable for environmental protection on the basis of robot successfully applied in other fields. This paper designs and realizes a tracked mobile robot of air quality monitoring, which can be used to monitor air quality for the pollution accident in industrial parks and regular management.

  5. Principles and Practices for Quality Assurance and Quality Control

    USGS Publications Warehouse

    Jones, Berwyn E.

    1999-01-01

    Quality assurance and quality control are vital parts of highway runoff water-quality monitoring projects. To be effective, project quality assurance must address all aspects of the project, including project management responsibilities and resources, data quality objectives, sampling and analysis plans, data-collection protocols, data quality-control plans, data-assessment procedures and requirements, and project outputs. Quality control ensures that the data quality objectives are achieved as planned. The historical development and current state of the art of quality assurance and quality control concepts described in this report can be applied to evaluation of data from prior projects.

  6. 75 FR 65594 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY... consolidation of Ohio's Ambient Air Quality Standards (AAQS) into Ohio's State Implementation Plan (SIP)...

  7. 75 FR 65572 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule... of Ohio's Ambient Air Quality Standards (AAQS) into Ohio's State Implementation Plan (SIP) under...

  8. Standards for Implementing Quality Prekindergarten Education.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore. Div. of Instruction.

    These standards are provided to promote the achievement of excellence in Maryland's public school prekindergarten programs. To that end, this document delineates standards of quality and provides a list of indicators that concretely describe what a program will look like if the standards are being met. The standards and indicators address seven…

  9. 76 FR 71886 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... Control District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... Quality Management District (SMAQMD) portions of the California State Implementation Plan (SIP). These... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does...

  10. Total Quality Management: A Guide to Implementation

    DTIC Science & Technology

    1989-08-01

    FIG. s-3. WORKFLOW DIAGRAM B-6 Appendix B: Seven Basic Graphic Tools PARETO CHARTS In the late 1800s, Vilfredo Pareto , an Italian economist, found...1. Collect .. Improvement Opportunities Graph Pareto Chart 2. Prioritize & Select T Improvement Opportunities . Fishbone Diagram Pareto Chart 3...Analyze Root Causes , Solution Selection Matrix Barriers and Aids 4. Select Solution -- Trial Implementation Pareto Chart Graph 5. Conduct Trial Checklst

  11. Quality control of bacterial enumeration.

    PubMed Central

    Donnison, A M; Ross, C M; Russell, J M

    1993-01-01

    Standard bacterial suspensions can be used to assess test method performance, via control charts, and inhibition of recovery when analyzing water samples. Variability in standard suspensions prepared from different strains and species and the use of frozen environmental samples for quality control for spore and bacteriophage analyses are also discussed. PMID:8481012

  12. Quality Management Systems Implementation Compared With Organizational Maturity in Hospital

    PubMed Central

    Moradi, Tayebeh; Jafari, Mehdi; Maleki, Mohammad Reza; Naghdi, Seyran; Ghiyasvand, Hesam

    2016-01-01

    Background: A quality management system can provide a framework for continuous improvement in order to increase the probability of customers and other stakeholders’ satisfaction. The test maturity model helps organizations to assess the degree of maturity in implementing effective and sustained quality management systems; plan based on the current realities of the organization and prioritize their improvement programs. Objectives: We aim to investigate and compare the level of organizational maturity in hospitals with the status of quality management systems implementation. Materials and Methods: This analytical cross sectional study was conducted among hospital administrators and quality experts working in hospitals with over 200 beds located in Tehran. In the first step, 32 hospitals were selected and then 96 employees working in the selected hospitals were studied. The data were gathered using the implementation checklist of quality management systems and the organization maturity questionnaire derived from ISO 10014. The content validity was calculated using Lawshe method and the reliability was estimated using test - retest method and calculation of Cronbach's alpha coefficient. The descriptive and inferential statistics were used to analyze the data using SPSS 18 software. Results: According to the table, the mean score of organizational maturity among hospitals in the first stage of quality management systems implementation was equal to those in the third stage and hypothesis was rejected (p-value = 0.093). In general, there is no significant difference in the organizational maturity between the first and third level hospitals (in terms of implementation of quality management systems). Conclusions: Overall, the findings of the study show that there is no significant difference in the organizational maturity between the hospitals in different levels of the quality management systems implementation and in fact, the maturity of the organizations cannot be

  13. Food and Nutrition Services Quality Control Management Program.

    ERIC Educational Resources Information Center

    Wimsatt-Fraim, Teresa S.

    A program was conducted to improve the quality of food service through the training of 44 food and nutrition service employees in a 200-bed hospital. A 12-week quality control program was implemented to address four key areas: food temperatures, food accuracy, food quality, and dietary personnel. Learning strategies, emphasizing critical thinking…

  14. Total Quality Management Implementation: Selected Readings

    DTIC Science & Technology

    1989-04-01

    characteristics Although the selection of banners makes it ap-Six ey iplenentliol chracerisics pear that the three approaches are entirel,, distinc.r in fact they...individuals and as a group. As a group, they are__ bulldozer, that the steering commintee of the tran$- formation. They plan and strategizC. best leads to " ey s...modular approach en- Action a individual/group planning for sures a better transfer of knowledge Planning implementing skills on the from the classroom to

  15. Quality control during IC processing

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Manual gives detailed test procedures for controlling silicon-wafer processing in manufacture of integrated circuits. Included among 43 test procedures are: ionic, bacterial, and solids contamination of high-purity water needed for wafer processing; crystallographic reflection, purity, and orientation; substrate dimensions and finish; thickness of deposited epitaxial films; oxide quality; photoresist characteristics; pinholes in insulating layers; metallized adhesion; and quality of ohmic contact.

  16. Implementing Total Quality Management in a University Setting.

    ERIC Educational Resources Information Center

    Coate, L. Edwin

    1991-01-01

    Oregon State University implemented Total Quality Management in nine phases: exploration; establishing a pilot study team; defining customer needs; adopting the breakthrough planning process; performing breakthrough planning in divisions; forming daily management teams; initiating cross-functional pilot projects; implementing cross-functional…

  17. 76 FR 20906 - Approval and Promulgation of Air Quality Implementation Plans; Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-14

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana AGENCY... State Implementation Plan (SIP) under the Clean Air Act. Indiana submitted revisions to the particulate...: (312) 408-2279. 4. Mail: Douglas Aburano, Chief, Control Strategies Section, Air Programs Branch...

  18. 78 FR 63929 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to Rules and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to Rules and Regulations for Control of Air Pollution; Permitting of Grandfathered Facilities AGENCY... of the Texas State Implementation Plan submitted by the Texas Commission on Environmental...

  19. Knowledge implementation - structures of intelligent control systems

    SciTech Connect

    Saridis, G.N.

    1988-08-01

    Results of research concerning the definitions and structure of intelligent control systems are outlined. Intelligent control systems are founded on the principle of precision with decreasing intelligence. This principle establishes a hierarchy in the distribution of intelligence in an intelligent control system and simply says that where intelligence is high, precision is less required, and vice versa. The resulting multilevel structure and its implementation, based on ideas from knowledge systems, are presented. Probabilistic models to express the uncertainty of reasoning, planning decision making at the organization level, and the control activities at the execution level entropies are used as measures of the execution of various commands by the intelligent machine, and they serve for optimal decision making. This method provides an efficient approach to implement autonomous intelligent control systems suitable for the demanding needs of modern industry, space exploration, nuclear handling, and medicine. 19 references.

  20. 78 FR 31459 - Approval and Promulgation of Air Quality Implementation Plans; Connecticut; Reasonably Available...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-24

    ...-1-FRL-9817-2] Approval and Promulgation of Air Quality Implementation Plans; Connecticut; Reasonably Available Control Technology Update To Address Control Techniques Guidelines Issued in 2006, 2007, and 2008... establishes and requires Reasonably Available Control Technology (RACT) for several categories of...

  1. 77 FR 52277 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-29

    ... AGENCY 40 CFR Part 52 Approval of Air Quality Implementation Plans; California; South Coast Air Quality... submitted for the South Coast Air Quality Management District (District) portion of the California State... the prevention of significant deterioration of air quality and visibility protection. The purpose...

  2. 78 FR 70497 - Approval and Promulgation of Air Quality Implementation Plans; Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ...-2013-0501; FRL-9902-26-Region 5] Approval and Promulgation of Air Quality Implementation Plans... quality standard for ozone under title I of the Clean Air Act (77 FR 37610). EPA's action became effective...-2450. 4. Mail: Pamela Blakley, Chief, Control Strategies Section, Air Programs Branch (AR-18J),...

  3. 76 FR 23196 - Approval and Promulgation of Air Quality Implementation Plans; IL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-26

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; IL AGENCY... definition of VOC for purposes of preparing SIPs to attain the national ambient air quality standard for...: Douglas Aburano, Chief, Control Strategies Section, Air Programs Branch (AR-18J), U.S....

  4. 76 FR 20237 - Approval and Promulgation of Air Quality Implementation Plans; District of Columbia; Section 110...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... Department of the Environment, Air Quality Division, 51 N Street, NE., Fifth Floor, Washington, DC 20002. FOR... CFR part 52 Environmental protection, Air pollution control, Incorporation by reference, Nitrogen... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; District of...

  5. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... proposing to approve a revision to the South Coast Air Quality Management District portion of the California... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan; South Coast Air...

  6. 78 FR 49925 - Revisions to California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... the Antelope Valley Air Quality Air Management District (AVAQMD) and Ventura County Air Pollution... AGENCY 40 CFR Part 52 Revisions to California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air Pollution Control District AGENCY: Environmental Protection...

  7. 77 FR 26448 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... approve revisions to the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air... rules were developed as part of the local agency's program to control these pollutants. Antelope...

  8. 78 FR 21545 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) and Monterey Bay Unified... developed as part of the local agency's program to control these pollutants. Antelope Valley AQMD Rule...

  9. 77 FR 41276 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Nonattainment New...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... Pennsylvania Department of Environmental Protection, Bureau of Air Quality Control, P.O. Box 84268, 400 Market... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania... restricted by statute. Certain other material, such as copyrighted material, is not placed on the...

  10. 76 FR 40237 - Approval and Disapproval and Promulgation of Air Quality Implementation Plans; Montana; Revisions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ..., Construction and Operation of Air Contaminant Sources) that pertain to the issuance of Montana air quality... prevent the construction of a source or modification that would violate the SIP control strategy or... AGENCY 40 CFR Part 52 Approval and Disapproval and Promulgation of Air Quality Implementation...

  11. 75 FR 65567 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Particulate Matter Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; Particulate... requirements. The particulate matter (PM) standards contain the particulate emission control requirements that have been necessary to attain and maintain the 2006 National Ambient Air Quality Standards (NAAQS)...

  12. 78 FR 78272 - Approval and Promulgation of Air Quality Implementation Plans; Connecticut; Ozone Attainment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Connecticut; Ozone... national ambient air quality standard. EPA is approving Connecticut's demonstration of attainment of the... area. EPA is also approving the reasonably available control measures (RACM) analysis for this...

  13. 40 CFR Appendix F to Part 132 - Great Lakes Water Quality Initiative Implementation Procedures

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Implementation Procedures F Appendix F to Part 132 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY GUIDANCE FOR THE GREAT LAKES SYSTEM Pt. 132, App. F Appendix F to... water quality, preclude attainment of WQS; or f. Controls more stringent than those required by...

  14. 40 CFR 136.7 - Quality assurance and quality control.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Quality assurance and quality control... assurance and quality control. The permittee/laboratory shall use suitable QA/QC procedures when conducting... quality control elements, where applicable, into the laboratory's documented standard operating...

  15. 40 CFR 136.7 - Quality assurance and quality control.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Quality assurance and quality control... assurance and quality control. The permittee/laboratory shall use suitable QA/QC procedures when conducting... quality control elements, where applicable, into the laboratory's documented standard operating...

  16. 40 CFR 136.7 - Quality assurance and quality control.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false Quality assurance and quality control... assurance and quality control. The permittee/laboratory shall use suitable QA/QC procedures when conducting... quality control elements, where applicable, into the laboratory's documented standard operating...

  17. 40 CFR 51.359 - Quality control.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 2 2012-07-01 2012-07-01 false Quality control. 51.359 Section 51.359....359 Quality control. Quality control measures shall insure that emission testing equipment is... quality control frequencies by using statistical process control to monitor equipment performance on...

  18. 40 CFR 51.359 - Quality control.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 2 2013-07-01 2013-07-01 false Quality control. 51.359 Section 51.359....359 Quality control. Quality control measures shall insure that emission testing equipment is... quality control frequencies by using statistical process control to monitor equipment performance on...

  19. 40 CFR 51.359 - Quality control.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 2 2011-07-01 2011-07-01 false Quality control. 51.359 Section 51.359....359 Quality control. Quality control measures shall insure that emission testing equipment is... quality control frequencies by using statistical process control to monitor equipment performance on...

  20. 40 CFR 51.359 - Quality control.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Quality control. 51.359 Section 51.359....359 Quality control. Quality control measures shall insure that emission testing equipment is... quality control frequencies by using statistical process control to monitor equipment performance on...

  1. 40 CFR 51.359 - Quality control.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 2 2014-07-01 2014-07-01 false Quality control. 51.359 Section 51.359....359 Quality control. Quality control measures shall insure that emission testing equipment is... quality control frequencies by using statistical process control to monitor equipment performance on...

  2. Quantum control implemented as combinatorial optimization.

    PubMed

    Strohecker, Traci; Rabitz, Herschel

    2010-01-15

    Optimal control theory provides a general means for designing controls to manipulate quantum phenomena. Traditional implementation requires solving coupled nonlinear equations to obtain the optimal control solution, whereas this work introduces a combinatorial quantum control (CQC) algorithm to avoid this complexity. The CQC technique uses a predetermined toolkit of small time step propagators in conjunction with combinatorial optimization to identify a proper sequence for the toolkit members. Results indicate that the CQC technique exhibits invariance of search effort to the number of system states and very favorable scaling upon comparison to a standard gradient algorithm, taking into consideration that CQC is easily parallelizable.

  3. Ride quality sensitivity to SAS control law and to handling quality variations

    NASA Technical Reports Server (NTRS)

    Roberts, P. A.; Schmidt, D. K.; Swaim, R. L.

    1976-01-01

    The RQ trends which large flexible aircraft exhibit under various parameterizations of control laws and handling qualities are discussed. A summary of the assumptions and solution technique, a control law parameterization review, a discussion of ride sensitivity to handling qualities, and the RQ effects generated by implementing relaxed static stability configurations are included.

  4. Implementation of Programmatic Quality and the Impact on Safety

    NASA Technical Reports Server (NTRS)

    Huls, Dale Thomas; Meehan, Kevin

    2005-01-01

    The purpose of this paper is to discuss the implementation of a programmatic quality assurance discipline within the International Space Station Program and the resulting impact on safety. NASA culture has continued to stress safety at the expense of quality when both are extremely important and both can equally influence the success or failure of a Program or Mission. Although safety was heavily criticized in the media after Colimbiaa, strong case can be made that it was the failure of quality processes and quality assurance in all processes that eventually led to the Columbia accident. Consequently, it is possible to have good quality processes without safety, but it is impossible to have good safety processes without quality. The ISS Program quality assurance function was analyzed as representative of the long-term manned missions that are consistent with the President s Vision for Space Exploration. Background topics are as follows: The quality assurance organizational structure within the ISS Program and the interrelationships between various internal and external organizations. ISS Program quality roles and responsibilities with respect to internal Program Offices and other external organizations such as the Shuttle Program, JSC Directorates, NASA Headquarters, NASA Contractors, other NASA Centers, and International Partner/participants will be addressed. A detailed analysis of implemented quality assurance responsibilities and functions with respect to NASA Headquarters, the JSC S&MA Directorate, and the ISS Program will be presented. Discussions topics are as follows: A comparison of quality and safety resources in terms of staffing, training, experience, and certifications. A benchmark assessment of the lessons learned from the Columbia Accident Investigation (CAB) Report (and follow-up reports and assessments), NASA Benchmarking, and traditional quality assurance activities against ISS quality procedures and practices. The lack of a coherent operational

  5. 78 FR 52893 - Implementation of the 2008 National Ambient Air Quality Standards for Ozone: State Implementation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Parts 50, 51, 70 and 71 RIN 2060-AR34 Implementation of the 2008 National Ambient Air Quality Standards for Ozone: State Implementation Plan Requirements Correction In proposed rule...

  6. Distributed Sensor Architecture for Intelligent Control that Supports Quality of Control and Quality of Service

    PubMed Central

    Poza-Lujan, Jose-Luis; Posadas-Yagüe, Juan-Luis; Simó-Ten, José-Enrique; Simarro, Raúl; Benet, Ginés

    2015-01-01

    This paper is part of a study of intelligent architectures for distributed control and communications systems. The study focuses on optimizing control systems by evaluating the performance of middleware through quality of service (QoS) parameters and the optimization of control using Quality of Control (QoC) parameters. The main aim of this work is to study, design, develop, and evaluate a distributed control architecture based on the Data-Distribution Service for Real-Time Systems (DDS) communication standard as proposed by the Object Management Group (OMG). As a result of the study, an architecture called Frame-Sensor-Adapter to Control (FSACtrl) has been developed. FSACtrl provides a model to implement an intelligent distributed Event-Based Control (EBC) system with support to measure QoS and QoC parameters. The novelty consists of using, simultaneously, the measured QoS and QoC parameters to make decisions about the control action with a new method called Event Based Quality Integral Cycle. To validate the architecture, the first five Braitenberg vehicles have been implemented using the FSACtrl architecture. The experimental outcomes, demonstrate the convenience of using jointly QoS and QoC parameters in distributed control systems. PMID:25723145

  7. Distributed sensor architecture for intelligent control that supports quality of control and quality of service.

    PubMed

    Poza-Lujan, Jose-Luis; Posadas-Yagüe, Juan-Luis; Simó-Ten, José-Enrique; Simarro, Raúl; Benet, Ginés

    2015-02-25

    This paper is part of a study of intelligent architectures for distributed control and communications systems. The study focuses on optimizing control systems by evaluating the performance of middleware through quality of service (QoS) parameters and the optimization of control using Quality of Control (QoC) parameters. The main aim of this work is to study, design, develop, and evaluate a distributed control architecture based on the Data-Distribution Service for Real-Time Systems (DDS) communication standard as proposed by the Object Management Group (OMG). As a result of the study, an architecture called Frame-Sensor-Adapter to Control (FSACtrl) has been developed. FSACtrl provides a model to implement an intelligent distributed Event-Based Control (EBC) system with support to measure QoS and QoC parameters. The novelty consists of using, simultaneously, the measured QoS and QoC parameters to make decisions about the control action with a new method called Event Based Quality Integral Cycle. To validate the architecture, the first five Braitenberg vehicles have been implemented using the FSACtrl architecture. The experimental outcomes, demonstrate the convenience of using jointly QoS and QoC parameters in distributed control systems.

  8. 78 FR 30770 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Illinois; Air... National Ambient Air Quality Standards (NAAQS) for ozone and particulate matter (PM). EPA is approving a... Implementation Plan at 35 Illinois Administrative Code part 243, which updates National Ambient Air...

  9. [Identification of Control Hospitals for the Implementation of the Nationwide and Standardized Evaluation of Model Projects According to § 64b SGB V: Analysis of Data from Structured Quality Reports].

    PubMed

    Petzold, T; Neumann, A; Seifert, M; Küster, D; Pfennig, A; Weiß, J; Häckl, D; Swart, E; Schmitt, J

    2016-11-15

    Background: Health care needs of mentally ill patients make special demands on cross-sectoral health care structures. § 64b SGB V enables care of mentally ill patients through model projects that are multi-professional, work across treatment periods and sectors and implement new forms of financing. These model projects in their hospitals (case hospitals) need to be evaluated and compared with standard treatment methods. Objectives: The aim of this analysis is to identify matching hospitals according to a priori defined criteria for the establishment of a control group (control hospitals) using secondary data. Materials and Methods: A systematic analysis was conducted based on structured quality reports according to §+137 SGB V and matched data from the Federal Institute for Research on Building, Urban Affairs and Spatial Development (BBSR). Based on a priori defined knock-out criteria, criteria based on patients (weighting 50%), structural features of hospitals (25%) and environmental factors (25%), a weighted similarity score was calculated for each of the 13 case hospitals, which could reach the maximum of 100 points (perfect match). Results: 10 control hospitals per case hospital were identified according to the weighted similarity score. The median of the total deviation of potential control hospitals from the case hospitals was 34.3 (range: 17.6-66.7). The median of the 10 selected control hospitals per case hospital was 30.9 (range: 17.6-40.8). Discussion: The defined algorithm could be used to identify similar control hospitals. The method using the mentioned databases and derivation of specific criteria of structural similarity are generally suitable in controlled designs for the evaluation of complex interventions based on routine data.

  10. Quality control of EUVE databases

    NASA Technical Reports Server (NTRS)

    John, L. M.; Drake, J.

    1992-01-01

    The publicly accessible databases for the Extreme Ultraviolet Explorer include: the EUVE Archive mailserver; the CEA ftp site; the EUVE Guest Observer Mailserver; and the Astronomical Data System node. The EUVE Performance Assurance team is responsible for verifying that these public EUVE databases are working properly, and that the public availability of EUVE data contained therein does not infringe any data rights which may have been assigned. In this poster, we describe the Quality Assurance (QA) procedures we have developed from the approach of QA as a service organization, thus reflecting the overall EUVE philosophy of Quality Assurance integrated into normal operating procedures, rather than imposed as an external, post facto, control mechanism.

  11. 23 CFR 1340.8 - Quality control.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Quality control. 1340.8 Section 1340.8 Highways NATIONAL... OBSERVATIONAL SURVEYS OF SEAT BELT USE Survey Design Requirements § 1340.8 Quality control. (a) Quality control... sites for the purpose of quality control. The same individual shall not serve as both the observer...

  12. 23 CFR 1340.8 - Quality control.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Quality control. 1340.8 Section 1340.8 Highways NATIONAL... OBSERVATIONAL SURVEYS OF SEAT BELT USE Survey Design Requirements § 1340.8 Quality control. (a) Quality control... sites for the purpose of quality control. The same individual shall not serve as both the observer...

  13. 23 CFR 1340.8 - Quality control.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Quality control. 1340.8 Section 1340.8 Highways NATIONAL... OBSERVATIONAL SURVEYS OF SEAT BELT USE Survey Design Requirements § 1340.8 Quality control. (a) Quality control... sites for the purpose of quality control. The same individual shall not serve as both the observer...

  14. Implementation of an intelligent control system

    NASA Technical Reports Server (NTRS)

    Simon, D. L.; Wong, E.; Musgrave, J. L.

    1992-01-01

    A laboratory testbed facility which was constructed at NASA LeRC for the development of an Intelligent Control System (ICS) for reusable rocket engines is described. The framework of the ICS consists of a hierarchy of various control and diagnostic functions. The traditional high speed, closed-loop controller resides at the lowest level of the ICS hierarchy. Above this level resides the diagnostic functions which identify engine faults. The ICS top level consists of the coordination function which manages the interaction between an expert system and a traditional control system. The purpose of the testbed is to demonstrate the feasibility of the OCS concept by implementing the ICS as the primary controller in a simulation of the Space Shuttle Main Engine (SSME). The functions of the ICS which are implemented in the testbed are as follows: an SSME dynamic simulation with selected fault mode models, a reconfigurable controller, a neural network for sensor validation, a model-based failure detection algorithm, a rule based failure detection algorithm, a diagnostic expert system, an intelligent coordinator, and a user interface which provides a graphical representation of the event occurring within the testbed. The diverse nature of the ICS has led to the development of a distributed architecture consisting of specialized hardware and software for the implementation of the various functions. This testbed is made up of five different computer systems. These individual computers are discussed along with the schemes used to implement the various ICS components. The communication between computers and the timing and synchronization between components are also addressed.

  15. Do predictors of the implementation quality of school-based prevention programs differ by program type?

    PubMed

    Payne, Allison Ann

    2009-06-01

    Research has indicated that the effectiveness of school-based prevention programs is affected by the implementation quality of these programs. As the importance of implementation has become clear, researchers have identified factors that appear to be related to implementation quality, including local program selection and training, integration into school operations, organizational capacity, principal support, and program standardization; however, it is unknown whether the impact of these factors differs by program type. Data from a nationally representative sample of 544 schools are used to create structural equation models representing hypothesized relationships among school and program factors and implementation quality, controlling for exogenous community factors. The relative importance of these factors for individual-level programs, such as behavior modification and counseling programs, versus environmental-level programs, such as improvements to classroom management or school planning and climate change programs, is the focus of this study. Implications for the implementation of school-based prevention program are discussed.

  16. Quality Assurance/Quality Control Jobs

    NASA Astrophysics Data System (ADS)

    Fanslau, Melody; Young, Janelle

    The production of a quality and safe food product is essential to the success of any food manufacturing facility. Because of this great importance, a career in quality can be extremely rewarding. Without happy customers willing to buy a product, a company would not be able to survive. Quality issues such as foreign objects, spoiled or mislabeled product, failure to meet net weight requirements, or a recall can all turn customers away from buying a product. The food industry is a customer-driven market in which some consumers are brand loyal based on a history of high quality or in which a single bad experience with a product will turn them away for a lifetime. With this said, the main role of a quality department is to help ensure that quality issues such as these are eliminated or kept to a minimum to maintain or increase the number of customers purchasing their product.

  17. Data Quality -- A Key to Successfully Implementing ECSS

    DTIC Science & Technology

    2009-03-01

    AFB, OH. 8 January 2009. Bose, I., Pal, R., & Ye, A. (2008). ERP and SCM Systems Integration: The Case of a Valve Manufacturer in China...response to the Expeditionary Logistics for the 21st While the driving force behind an ERP system implementation is exploitation of the numerous benefits...failure. Data quality is one critical factor in the successful implementation of any ERP system . It is a key to optimizing system performance while

  18. 78 FR 40086 - Approval and Promulgation of Air Quality Implementation Plans; Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Illinois AGENCY....pamela@epa.gov 3. Fax: (312) 692-2450. 4. Mail: Pamela Blakley, Chief, Control Strategies Section, Air..., Illinois 60604. 5. Hand Delivery: Pamela Blakley, Chief, Control Strategies Section, Air Programs...

  19. 77 FR 41914 - Approval and Promulgation of Air Quality Implementation Plans; Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-17

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana AGENCY... . 3. Fax: (312)692-2450. 4. Mail: Pamela Blakley, Chief, Control Strategies Section, Air Programs.... 5. Hand Delivery: Pamela Blakley, Chief, Control Strategies Section, Air Programs Branch (AR-18J),...

  20. 78 FR 40013 - Approval and Promulgation of Air Quality Implementation Plans; Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Illinois AGENCY...: Pamela Blakley, Chief, Control Strategies Section, Air Programs Branch (AR-18J), U.S. Environmental..., Chief, Control Strategies Section, Air Programs Branch (AR-18J), U.S. Environmental Protection...

  1. 75 FR 78646 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-16

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Minnesota AGENCY...: (312) 408-2279. 4. Mail: Douglas Aburano, Chief, Control Strategies Section, Air Programs Branch (AR.... Hand Delivery: Douglas Aburano, Chief, Control Strategies Section, Air Programs Branch (AR-18J),...

  2. 78 FR 63093 - Approval and Promulgation of Air Quality Implementation Plans; Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana AGENCY....pamela@epa.gov . 3. Fax: (312) 692-2450. 4. Mail: Pamela Blakley, Chief, Control Strategies Section, Air..., Illinois 60604. 5. Hand Delivery: Pamela Blakley, Chief, Control Strategies Section, Air Programs...

  3. 76 FR 61069 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-03

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District, Ventura County Air Pollution Control District, and Placer County Air... (SMAQMD), Ventura County Air Pollution Control District (VCAPCD), and Placer County Air Pollution...

  4. 76 FR 55842 - Partial Approval and Partial Disapproval of Air Quality Implementation Plans; California; San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... AGENCY 40 CFR Part 52 Partial Approval and Partial Disapproval of Air Quality Implementation Plans; California; San Joaquin Valley; Reasonably Available Control Technology for Ozone AGENCY: Environmental... disapprove a revision to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD or...

  5. 77 FR 12482 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule... Clean Air Act (CAA). This submittal incorporates the National Ambient Air Quality Standards (NAAQS)...

  6. 78 FR 19990 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-03

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards; Correction AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule... air quality standards in a new chapter of rules and adjusted the rule references accordingly...

  7. 78 FR 30829 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards Revision AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY... current national ambient air quality standards (NAAQS) for ozone, lead, and particulate matter. EPA...

  8. 77 FR 12524 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule...) under the Clean Air Act (CAA). This submittal incorporates the National Ambient Air Quality...

  9. Quality Control Review of Teacher-Made Tests.

    ERIC Educational Resources Information Center

    Chambers, Barbara

    A process of reviewing teacher-made tests was developed to implement the court-approved subplan for a "procedure for continual quality control checks on teacher-constructed tests." The implementation process includes six steps: (1) distribution to teachers of Resource Materials Excerpted from Classroom Test Skills - a package to increase…

  10. Trends in implementation of longwall dust controls

    SciTech Connect

    Haney, R.A.

    1995-12-31

    During the last ten years, longwall mining systems have undergone many changes. Panel widths and lengths have increased. Long-wall faces have become more automated. Average production from individual longwall panels has increased from 1,000 to 3,600 tons per shift. To control the dust generation resulting from the higher production, longwall dust control systems have integrated various dust control techniques. Systems designed to control dust generated at the crusher/stageloader, shearer, and supports are common to most longwall faces. A survey was made of the dust controls that are currently in place on all the longwalls in the U.S. This survey addressed the types of controls used to reduce dust generated at the crusher/stageloader, shearer and roof support movement. Additionally, information on face ventilation rates, cutting cycle and level of automation was obtained. The purpose of this paper is to review the dust control practices that have been implemented throughout the United States and to identify those controls that are being used on high production longwall faces. Additionally, a model is used to demonstrate how ventilation and automation affect occupational exposure. Automation of roof support movement can offer some of the greatest reductions in occupational dust exposures. While technically feasible, its full benefit has not been fully realized by the industry. Until technology to fully automate longwall mining systems becomes more reliable, future dust control systems must rely on increased ventilation, application of headgate dust collectors, improved shearer dust controls and improved shield dust suppression systems.

  11. 7 CFR 981.42 - Quality control.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 8 2013-01-01 2013-01-01 false Quality control. 981.42 Section 981.42 Agriculture... Regulating Handling Quality Control § 981.42 Quality control. (a) Incoming. Except as provided in this... establish, with the approval of the Secretary, such minimum quality and inspection requirements...

  12. 7 CFR 981.42 - Quality control.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 8 2014-01-01 2014-01-01 false Quality control. 981.42 Section 981.42 Agriculture... Regulating Handling Quality Control § 981.42 Quality control. (a) Incoming. Except as provided in this... establish, with the approval of the Secretary, such minimum quality and inspection requirements...

  13. 7 CFR 981.42 - Quality control.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Quality control. 981.42 Section 981.42 Agriculture... Regulating Handling Quality Control § 981.42 Quality control. (a) Incoming. Except as provided in this... establish, with the approval of the Secretary, such minimum quality and inspection requirements...

  14. 7 CFR 930.44 - Quality control.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 8 2014-01-01 2014-01-01 false Quality control. 930.44 Section 930.44 Agriculture... MICHIGAN, NEW YORK, PENNSYLVANIA, OREGON, UTAH, WASHINGTON, AND WISCONSIN Order Regulating Handling Quality Control § 930.44 Quality control. (a) Quality standards. The Board may establish, with the approval of...

  15. 7 CFR 930.44 - Quality control.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 8 2012-01-01 2012-01-01 false Quality control. 930.44 Section 930.44 Agriculture... MICHIGAN, NEW YORK, PENNSYLVANIA, OREGON, UTAH, WASHINGTON, AND WISCONSIN Order Regulating Handling Quality Control § 930.44 Quality control. (a) Quality standards. The Board may establish, with the approval of...

  16. 7 CFR 930.44 - Quality control.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Quality control. 930.44 Section 930.44 Agriculture... MICHIGAN, NEW YORK, PENNSYLVANIA, OREGON, UTAH, WASHINGTON, AND WISCONSIN Order Regulating Handling Quality Control § 930.44 Quality control. (a) Quality standards. The Board may establish, with the approval of...

  17. 7 CFR 981.42 - Quality control.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 8 2012-01-01 2012-01-01 false Quality control. 981.42 Section 981.42 Agriculture... Regulating Handling Quality Control § 981.42 Quality control. (a) Incoming. Except as provided in this... establish, with the approval of the Secretary, such minimum quality and inspection requirements...

  18. 7 CFR 930.44 - Quality control.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Quality control. 930.44 Section 930.44 Agriculture... MICHIGAN, NEW YORK, PENNSYLVANIA, OREGON, UTAH, WASHINGTON, AND WISCONSIN Order Regulating Handling Quality Control § 930.44 Quality control. (a) Quality standards. The Board may establish, with the approval of...

  19. 7 CFR 981.42 - Quality control.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Quality control. 981.42 Section 981.42 Agriculture... Regulating Handling Quality Control § 981.42 Quality control. (a) Incoming. Except as provided in this... establish, with the approval of the Secretary, such minimum quality and inspection requirements...

  20. 7 CFR 930.44 - Quality control.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 8 2013-01-01 2013-01-01 false Quality control. 930.44 Section 930.44 Agriculture... MICHIGAN, NEW YORK, PENNSYLVANIA, OREGON, UTAH, WASHINGTON, AND WISCONSIN Order Regulating Handling Quality Control § 930.44 Quality control. (a) Quality standards. The Board may establish, with the approval of...

  1. New regulatory framework for wastewater quality control in Mexico.

    PubMed

    Saade Hazin, L

    2000-01-01

    This paper analyses the new regulatory framework for wastewater quality control developed in Mexico. It provides a description of the Mexican government strategies for water pollution control. The discussion focuses on the policy instruments used, their evolution and the main difficulties encountered in their implementation. The new regulatory framework is discussed highlighting some of the economic implications of the reforms. The paper concludes that proper institutional development and monitoring are essential factors for the success of any policy instrument for wastewater quality control.

  2. Implementation methods for vision related quality of life questionnaires

    PubMed Central

    Wolffsohn, J; Cochrane, A; Watt, N

    2000-01-01

    AIM—To determine the most reliable and consistent method and time interval over which to implement a vision impairment quality of life assessment tool.
METHODS—117 patients with low vision aged 9-101 years were assigned into three age, sex, and visual function matched groups (n = 39 in each) to answer the Low Vision Quality of Life (LVQOL) questionnaire by post, telephone, or in person. The LVQOL questionnaire was completed on four occasions, each separated by four weeks.
RESULTS—Postal implementation was the most cost effective method, showed the highest internal consistency of LVQOL items, but resulted in a lower apparent quality of life score than either telephone or in-person interviews (p<0.001). There was no difference in test-retest reliability between the three methods of implementation (p = 0.12). The profile of LVQOL scores showed a trend towards reduced quality of life scores 3 months after the baseline measures, although this was not significant.
CONCLUSION—Posting may be the method of choice for clinical measurement of vision related quality of life. Patients with greater visual impairment were no less likely to complete a questionnaire when implemented by post and there was no apparent bias from other people assisting them. The quality of life measure can occur at any time up to 2 months after low vision rehabilitation for the progressive nature of conditions causing low vision not to cause a decreased baseline score. The LVQOL was shown to be a highly internally consistent and reliable method for measuring quality of life in the visually impaired.

 PMID:10966961

  3. A Total Quality-Control Plan with Right-Sized Statistical Quality-Control.

    PubMed

    Westgard, James O

    2017-03-01

    A new Clinical Laboratory Improvement Amendments option for risk-based quality-control (QC) plans became effective in January, 2016. Called an Individualized QC Plan, this option requires the laboratory to perform a risk assessment, develop a QC plan, and implement a QC program to monitor ongoing performance of the QC plan. Difficulties in performing a risk assessment may limit validity of an Individualized QC Plan. A better alternative is to develop a Total QC Plan including a right-sized statistical QC procedure to detect medically important errors. Westgard Sigma Rules provides a simple way to select the right control rules and the right number of control measurements.

  4. School Indoor Air Quality Assessment and Program Implementation.

    ERIC Educational Resources Information Center

    Prill, R.; Blake, D.; Hales, D.

    This paper describes the effectiveness of a three-step indoor air quality (IAQ) program implemented by 156 schools in the states of Washington and Idaho during the 2000-2001 school year. An experienced IAQ/building science specialist conducted walk-through assessments at each school. These assessments documented deficiencies and served as an…

  5. Implementation Quality of Family Literacy Programmes: A Review of Literature

    ERIC Educational Resources Information Center

    de la Rie, S.; van Steensel, R. C. M.; van Gelderen, A. J. S.

    2017-01-01

    Raising the literacy levels of young children is a major concern in many countries for which various programmes have been suggested. One of these is family literacy programmes. In previous meta-analyses wide variability in effects has been found and it has been suggested that this is partly caused by variability in implementation quality. This…

  6. Implementing Quality Service-Learning Programs in Community Colleges

    ERIC Educational Resources Information Center

    Vaknin, Lauren Weiner; Bresciani, Marilee J.

    2013-01-01

    This cross-case comparative study at Western Community College and the University of the Coast explored through a constructive lens the characteristics that lead to sustainable, high quality service-learning programs and how they are implemented at institutions of higher education. The researchers determined that both Western Community College and…

  7. Implementation of quality standards in an individual monitoring service.

    PubMed

    Hyvönen, H; Vartiainen, E

    2001-01-01

    In this paper the implementation of a quality system to the procedures of an individual monitoring service (IMS) is described from the practical perspective. The IMS of the Radiation and Nuclear Safety Authority (STUK) is used as an example. The IMS of STUK monitors about 8500 persons mainly working in hospitals, industry and research centres. The current thermoluminescence dosemeter (TLD) system was introduced in 1992 and the whole service changed to TLDs in 1995. The quality system compatible with the quality standards was introduced in 1999. An application for accreditation to fulfill EN45001 and ISO/IEC Guide 25 was made in December 1999, accreditation was achieved in August 2000 by the Finnish Accreditation Service (FINAS). The considerations needed for the quality system to fulfill the requirements of the quality standards are reported.

  8. What Constitutes High-Quality Implementation of SEL Programs? A Latent Class Analysis of Second Step® Implementation.

    PubMed

    Low, Sabina; Smolkowski, Keith; Cook, Clay

    2016-11-01

    With the increased number of schools adopting social-emotional learning (SEL) programming, there is increased emphasis on the role of implementation in obtaining desired outcomes. Despite this, the current knowledge of the active ingredients of SEL programming is lacking, and there is a need to move from a focus on "whether" implementation matters to "what" aspects of implementation matter. To address this gap, the current study utilizes a latent class approach with data from year 1 of a randomized controlled trial of Second Step® (61 schools, 321 teachers, over 7300 students). Latent classes of implementation were identified, then used to predict student outcomes. Teachers reported on multiple dimensions of implementation (adherence, dosage, competency), as well as student outcomes. Observational data were also used to assess classroom behavior (academic engagement and disruptive behavior). Results suggest that a three-class model fits the data best, labeled as high-quality, low-engagement, and low-adherence classes. Only the low-engagement class showed significant associations with poorer outcomes, when compared to the high-quality class (not the low-adherence class). Findings are discussed in terms of implications for program development and implementation science more broadly.

  9. Implementation Of Quality Management System For Irradiation Processing Services

    NASA Astrophysics Data System (ADS)

    Lungu, Ion-Bogdan; Manea, Maria-Mihaela

    2015-07-01

    In today's market, due to an increasing competitiveness, quality management has set itself as an indispensable tool and a reference point for every business. It is ultimately focused on customer satisfaction which is a stringent factor for every business. Implementing and maintaining a QMS is a rather difficult, time consuming and expensive process which must be done with respect of many factors. The aim of this paper is to present a case study for implementing QMS ISO 9001 in a gamma irradiation treatment service provider. The research goals are the identification of key benefits, reasons, advantages, disadvantages, drawbacks etc for a successful QMS implementation and use. Finally, the expected results focus on creating a general framework for implementing an efficient QMS plan that can be easily adapted to other kind of services and markets.

  10. CONSCAN implementation for Antenna Control Assembly

    NASA Technical Reports Server (NTRS)

    Ohlson, J. E.; Abichandani, K. P.

    1982-01-01

    The specifics of the CONSCAN, including calibration, signal cleanup, and system protection are presented. The CONSCAN was previously recommended for implementation in the antenna control assembly. Equations for programming the algorithms are provided. The described treatment is designed to lead to developing K-band. The recommended techniques to be employed in conjunction with CONSCAN are summarized: (1) for initial acquisition, employ stepped spiral search; (2) employ continued and incessant testing of signals to verify: in-lock, reasonable in level, and within limits; (3) use FFT for signal processing if feasible, as it provides more tests and insight into existence of glitches and spurious content of the input signal level.

  11. Feed forward control: An implementation at CIRFEL

    SciTech Connect

    Krishnaswamy, J.; Lehrman, I.S.; Hartley, R.

    1995-12-31

    An integral part of the Compact InfraRed Free Electron LASER (CIRFEL) is control of the phase and amplitude stability in the RF power system. We have implemented such a Feed Forward system using the LabView software package, by National Instruments. We will discuss implementation and performance data of the Feed Forward control of the RF power system at CIRFEL. We will also briefly discuss some conditions under which the problem is ill-conditioned, and what idealizations can be made to remedy these ill-conditioned systems. Using an arbitrary function generator, we generate a driving signal for a voltage-controlled attenuator at the input side of the RF system, and we monitor the RF voltage in cell I of the photocathode gun using a digital storage oscilliscope in averaging mode. The system is stable enough to use data from one shot to modify the inputs for future shots. After downloading the averaged data to a personal computer via a GPIB (IEEE 488) bus, we use a simple linear transformation on the difference waveform between the current shot and the target to produce a correction signal. This signal is added to the driving signal in the arbitrary function generator, and the process is repeated until we get the flatness we need in the output signals from cell 1. The system for phase control is similar, with a voltage-controlled phase shifter replacing the attenuator, and monitoring of the RF phase in cell I replacing the monitoring of RF voltage. By repeatedly alternating between correcting the RF voltage (equivalent to correcting the RF power) and RF phase in cell 1, we are able to achieve simultaneous phase variations of <{+-}1{degrees} and amplitude variations of <{+-}0.1% over a 3{mu}sec pulse.

  12. 33 CFR 385.21 - Quality control.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Quality control. 385.21 Section... Processes § 385.21 Quality control. (a) The Corps of Engineers and the non-Federal sponsor shall prepare a quality control plan, in accordance with applicable Corps of Engineers regulations, for each product...

  13. 33 CFR 385.21 - Quality control.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Quality control. 385.21 Section... Processes § 385.21 Quality control. (a) The Corps of Engineers and the non-Federal sponsor shall prepare a quality control plan, in accordance with applicable Corps of Engineers regulations, for each product...

  14. 14 CFR 21.139 - Quality control.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Quality control. 21.139 Section 21.139... PROCEDURES FOR PRODUCTS AND PARTS Production Certificates § 21.139 Quality control. The applicant must show that he has established and can maintain a quality control system for any product, for which...

  15. 14 CFR 21.139 - Quality control.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Quality control. 21.139 Section 21.139... PROCEDURES FOR PRODUCTS AND PARTS Production Certificates § 21.139 Quality control. The applicant must show that he has established and can maintain a quality control system for any product, for which...

  16. 33 CFR 385.21 - Quality control.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Quality control. 385.21 Section... Processes § 385.21 Quality control. (a) The Corps of Engineers and the non-Federal sponsor shall prepare a quality control plan, in accordance with applicable Corps of Engineers regulations, for each product...

  17. 33 CFR 385.21 - Quality control.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Quality control. 385.21 Section... Processes § 385.21 Quality control. (a) The Corps of Engineers and the non-Federal sponsor shall prepare a quality control plan, in accordance with applicable Corps of Engineers regulations, for each product...

  18. 33 CFR 385.21 - Quality control.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Quality control. 385.21 Section... Processes § 385.21 Quality control. (a) The Corps of Engineers and the non-Federal sponsor shall prepare a quality control plan, in accordance with applicable Corps of Engineers regulations, for each product...

  19. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    SciTech Connect

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  20. 78 FR 63148 - Approval and Promulgation of Air Quality Implementation Plans; Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana AGENCY... Section, Air Programs Branch (AR-18J), U.S. Environmental Protection Agency, 77 West Jackson Boulevard, Chicago, Illinois 60604. 5. Hand Delivery: Pamela Blakley, Chief, Control Strategies Section, Air...

  1. 76 FR 24846 - Approval and Promulgation of Air Quality Implementation Plans; Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-03

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Illinois AGENCY..., Chief, Control Strategies Section, Air Programs Branch (AR-18J), U.S. Environmental Protection Agency... Strategies Section, Air Programs Branch (AR-18J), U.S. Environmental Protection Agency, 77 West...

  2. 78 FR 70516 - Approval and Promulgation of Air Quality Implementation Plans; Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ... 9902- 27-Region 5] Approval and Promulgation of Air Quality Implementation Plans; Illinois AGENCY..., Control Strategies Section, Air Programs Branch (AR-18J), U.S. Environmental Protection Agency, 77 West... Section, Air Programs Branch (AR-18J), U.S. Environmental Protection Agency, 77 West Jackson...

  3. 77 FR 41954 - Approval and Promulgation of Air Quality Implementation Plans; Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-17

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana AGENCY..., Control Strategies Section, Air Programs Branch (AR-18J), Environmental Protection Agency, Region 5,...

  4. 78 FR 49684 - Approval and Disapproval of Air Quality State Implementation Plans; Arizona; Regional Haze and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by... AGENCY 40 CFR Part 52 Approval and Disapproval of Air Quality State Implementation Plans; Arizona... the rule under section 307(b)(1) of the Clean Air Act. This document corrects those errors...

  5. 75 FR 78949 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Permits for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Permits for Construction and Major Modification of Major Stationary Sources of Air Pollution for the... certain references to pollution control projects (PCPs) and clean units (CUs) to make the West...

  6. Statistical process control for radiotherapy quality assurance.

    PubMed

    Pawlicki, Todd; Whitaker, Matthew; Boyer, Arthur L

    2005-09-01

    Every quality assurance process uncovers random and systematic errors. These errors typically consist of many small random errors and a very few number of large errors that dominate the result. Quality assurance practices in radiotherapy do not adequately differentiate between these two sources of error. The ability to separate these types of errors would allow the dominant source(s) of error to be efficiently detected and addressed. In this work, statistical process control is applied to quality assurance in radiotherapy for the purpose of setting action thresholds that differentiate between random and systematic errors. The theoretical development and implementation of process behavior charts are described. We report on a pilot project is which these techniques are applied to daily output and flatness/symmetry quality assurance for a 10 MV photon beam in our department. This clinical case was followed over 52 days. As part of our investigation, we found that action thresholds set using process behavior charts were able to identify systematic changes in our daily quality assurance process. This is in contrast to action thresholds set using the standard deviation, which did not identify the same systematic changes in the process. The process behavior thresholds calculated from a subset of the data detected a 2% change in the process whereas with a standard deviation calculation, no change was detected. Medical physicists must make decisions on quality assurance data as it is acquired. Process behavior charts help decide when to take action and when to acquire more data before making a change in the process.

  7. Quality assurance and quality control in monitoring programs

    USGS Publications Warehouse

    Shampine, W.J.

    1993-01-01

    There are three general characteristics of the data to be collected in a monitoring program that should be met in order to maximize the use and value of the data: the data quality should be known the data type and quality should be consistent and comparable, and the data should be available and accessible. Potential problems with each of these characteristics are addressed effectively by quality assurance and quality control. One of the most important aspects of quality assurance in a monitoring program is the development of a quality assurance plan, which should identify clearly the quality of the data needed and describe in detail the planned actions to provide confidence that the program will meet its stated objectives. Quality control data, which allow for the quality and suitability of the environmental data to be evaluated and ascertained, should be collected and utilized as an integral part of the QA effort associated with a monitoring program.

  8. Business quality control in issuing life insurance.

    PubMed

    Roberts, N K

    1999-01-01

    Fraud investigation and fraud control are entirely different processes. Similarly the auditing of a life insurance company and the issuing of life insurance policies and business quality control are not the same. Business quality control and fraud control have much in common. In this article, these similarities are explored and a case is made that companies issuing life insurance policies should consider the business quality control approach rather than the more traditional investigatory methods.

  9. Nursing Leader Collaboration to Drive Quality Improvement and Implementation Science.

    PubMed

    Ryan, Rosemary W; Harris, Karen K; Mattox, Lisa; Singh, Olivine; Camp, Melanie; Shirey, Maria R

    2015-01-01

    Nursing leadership opportunities to improve quality and align resources in health care exist. An estimated 18% of United States gross domestic product is spent on health care delivery systems that produce poor outcomes. The purpose of this article was to describe how quality improvement and implementation science initiatives enhance outcomes using nursing leadership strategies that play an integral role in aligning key colleagues to drive the collaborative process. A critical appraisal of the literature was conducted, which supports the importance of evidenced-based practice improvement, collaborative change process, and professional role of nursing leadership. Limited evidence exists related to practice strategies for nursing leaders to implement sustainable change at the unit level for successful alignment of resources. Strategies based on Rogers' Diffusion of Innovation Theory are recommended to address the gap in the literature. The strategies aim to increase meaningful knowledge or the "why," create a tipping point, and implement sustainable change starting with the end in mind. Nurse leaders are a central component for driving alignment and implementing change at the unit level. Uses of the described evidenced-based strategies have implications for nursing practice, education, and scholarship.

  10. Rapid algorithm prototyping and implementation for power quality measurement

    NASA Astrophysics Data System (ADS)

    Kołek, Krzysztof; Piątek, Krzysztof

    2015-12-01

    This article presents a Model-Based Design (MBD) approach to rapidly implement power quality (PQ) metering algorithms. Power supply quality is a very important aspect of modern power systems and will become even more important in future smart grids. In this case, maintaining the PQ parameters at the desired level will require efficient implementation methods of the metering algorithms. Currently, the development of new, advanced PQ metering algorithms requires new hardware with adequate computational capability and time intensive, cost-ineffective manual implementations. An alternative, considered here, is an MBD approach. The MBD approach focuses on the modelling and validation of the model by simulation, which is well-supported by a Computer-Aided Engineering (CAE) packages. This paper presents two algorithms utilized in modern PQ meters: a phase-locked loop based on an Enhanced Phase Locked Loop (EPLL), and the flicker measurement according to the IEC 61000-4-15 standard. The algorithms were chosen because of their complexity and non-trivial development. They were first modelled in the MATLAB/Simulink package, then tested and validated in a simulation environment. The models, in the form of Simulink diagrams, were next used to automatically generate C code. The code was compiled and executed in real-time on the Zynq Xilinx platform that combines a reconfigurable Field Programmable Gate Array (FPGA) with a dual-core processor. The MBD development of PQ algorithms, automatic code generation, and compilation form a rapid algorithm prototyping and implementation path for PQ measurements. The main advantage of this approach is the ability to focus on the design, validation, and testing stages while skipping over implementation issues. The code generation process renders production-ready code that can be easily used on the target hardware. This is especially important when standards for PQ measurement are in constant development, and the PQ issues in emerging smart

  11. Implementation of a Quality Plan (ISO 9002) In a Regional Tissue Bank.

    PubMed

    Villalba, R.; Eisman, M.; Fornés, G.; Mesa, A.; De Torres, P.; Ariza, M.J.; Gutierrez Guzmán, A.; Gómez Villagrán, J.L.

    2001-01-01

    Quality control and standardized preservation methods are essential in the field of transplantation. The International Organization for Standardization (ISO) has established a common set of manufacturing, trade and communications standards that are applicable worldwide and that provide the basis of a quality plan for Tissuebreak Banks.The Sectorial Tissue Banking (STB) of the Regional Blood Transfusion Center (RBTC) of Córdoba (Spain) is a non-profit-making tissue bank, established in 1992 to provide tissues for surgical procedures to the hospitals in a regional area. In 1998, the STB as a part of the RBTC embarked upon the path of becoming ISO-certified: after two years of the implementation of the project, STB attained ISO 9002 certification, thus becoming one of the first tissue banks in Europe to achieve this qualification. In this paper we describe the process of becoming ISO-certified, to demonstrate the positive impact that it has had on our entire organization.The assistance of an outside consultant who provided the necessary information for implementing an ISO quality management system was required. The initial improvement was: a well-defined quality manual to address all elements of the ISO 9002 standard, an improved document control system, detailed standard operating procedures (SOPs) and improved employees training processes. A quality committee team and developed quality indicators were created. The internal quality auditing program was established by the selection of employees from a cross-section of the organization, who were trained in internal auditing processes. A formal corrective action system was developed and implemented to facilitate process improvement. The consultant conducted a pre-certification audit, and one month later the certification audit was performed.In conclusion, the implementation of an ISO quality program in the STB has helped our center to establish a control process in the manufacturing of products and services to meet the

  12. Assurance of medical device quality with quality management system: an analysis of good manufacturing practice implementation in Taiwan.

    PubMed

    Li, Tzu-Wei; Tu, Pei-Weng; Liu, Li-Ling; Wu, Shiow-Ing

    2015-01-01

    The implementation of an effective quality management system has always been considered a principal method for a manufacturer to maintain and improve its product and service quality. Globally many regulatory authorities incorporate quality management system as one of the mandatory requirements for the regulatory control of high-risk medical devices. The present study aims to analyze the GMP enforcement experience in Taiwan between 1998 and 2013. It describes the regulatory implementation of medical device GMP requirement and initiatives taken to assist small and medium-sized enterprises in compliance with the regulatory requirement. Based on statistical data collected by the competent authority and industry research institutes, the present paper reports the growth of Taiwan local medical device industry after the enforcement of GMP regulation. Transition in the production, technologies, and number of employees of Taiwan medical device industry between 1998 and 2013 provides the competent authorities around the world with an empirical foundation for further policy development.

  13. Assurance of Medical Device Quality with Quality Management System: An Analysis of Good Manufacturing Practice Implementation in Taiwan

    PubMed Central

    Tu, Pei-Weng; Wu, Shiow-Ing

    2015-01-01

    The implementation of an effective quality management system has always been considered a principal method for a manufacturer to maintain and improve its product and service quality. Globally many regulatory authorities incorporate quality management system as one of the mandatory requirements for the regulatory control of high-risk medical devices. The present study aims to analyze the GMP enforcement experience in Taiwan between 1998 and 2013. It describes the regulatory implementation of medical device GMP requirement and initiatives taken to assist small and medium-sized enterprises in compliance with the regulatory requirement. Based on statistical data collected by the competent authority and industry research institutes, the present paper reports the growth of Taiwan local medical device industry after the enforcement of GMP regulation. Transition in the production, technologies, and number of employees of Taiwan medical device industry between 1998 and 2013 provides the competent authorities around the world with an empirical foundation for further policy development. PMID:26075255

  14. [Quality of vocational education in speech therapy - development and implementation of a quality assurance programme].

    PubMed

    Ullrich, A; Kawski, S; Koch, U; Härter, M

    2014-12-01

    The provision of high-quality health-services is only possible if it is based on vocational education of corresponding quality. To promote the quality of vocational education in speech therapy, a quality assurance programme was developed in a scientifically supervised multi-step process. The main goals of the quality assurance programme include: (i) external review of the quality of education by means of well-defined criteria, (ii) certification of schools that meet the requirements, and (iii) provision of feedback to schools about their results. A total of 208 quality indicators cover the essential aspects of vocational education in speech therapy, and apply to the structural, process and outcome quality. These indicators are based on a literature survey as well as on expert opinion, and are calibrated by data. The data are collected by using questionnaires (school management, teachers in speech therapy, students, consecutive patient sample) and are validated by specific document analyses and telephone audits. Each school receives an individual quality report of its achieved results benchmarked to other schools. Since the initial implementation in 2008, a total of 50 schools participated in the quality assurance programme and 41 achieved certification. Therefore, the defined set of quality criteria has been disseminated and utilized by about half of all German schools for vocational education in speech therapy. The evaluation of the data on quality collected across all schools highlights the strengths and weaknesses of vocational education as well as the demands for quality improvement.

  15. 7 CFR 981.442 - Quality control.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 8 2013-01-01 2013-01-01 false Quality control. 981.442 Section 981.442 Agriculture... Administrative Rules and Regulations § 981.442 Quality control. (a) Incoming. Pursuant to § 981.42(a), the... identify the critical factors needed to ensure the quality of the final product. (iii) Process...

  16. 7 CFR 981.442 - Quality control.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 8 2012-01-01 2012-01-01 false Quality control. 981.442 Section 981.442 Agriculture... Administrative Rules and Regulations § 981.442 Quality control. (a) Incoming. Pursuant to § 981.42(a), the... identify the critical factors needed to ensure the quality of the final product. (iii) Process...

  17. Information quality-control model

    NASA Technical Reports Server (NTRS)

    Vincent, D. A.

    1971-01-01

    Model serves as graphic tool for estimating complete product objectives from limited input information, and is applied to cost estimations, product-quality evaluations, and effectiveness measurements for manpower resources allocation. Six product quality levels are defined.

  18. 75 FR 40762 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental... Sacramento Metropolitan Air Quality Management District (SMAQMD) and South Coast Air Quality...

  19. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... County Air Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality...

  20. 76 FR 67396 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Sacramento Metro Air Quality Management District (SMAQMD) portions of the California State Implementation Plan...

  1. Implementing Total Quality Management (TQM) 1: The Command Imperative

    DTIC Science & Technology

    1992-12-01

    AL-SR-1992-0012 AD-A259 885 IMPLEMENTING TOTAL QUALITY A MANAGEMENT (TQM) I: R THE COMMAND IMPERATIVE M S T Charles N. Weaver R Malcolm T. Upton...Special Report for Period November 1990 - November 1991 B 0 R A Approved for public release; distribution is unlimited. T 0T R DT y :71-1vCTE9 g B • , |H...nationals. This special report has been reviewed and is approved for publication. COL T O, aAUSAF WILUAM E. ALLEY, Technical Di r Project Scientist

  2. Radiological control technician implementing continuing training

    SciTech Connect

    Killand, B.

    1993-12-31

    The Westinghouse Hanford Company (WHC) has developed and is implementing a continuing training program for RCTs. This program was designed to meet the requirements of the DOE and Hanford Site Radiological Control Manual. The program is scheduled on a biennial (two year), six cycle format, where each cycle is seventeen weeks in length. This enables the technician to be in the classroom three times per year, for an average of four days each cycle. Content emphasis is placed on: academics review; lessons learned; new equipment and procedures; practical skills training; and oral board preparation. Academic reviews provide refresher training on core and site academics in both lecture and overview formats. During the first five cycles, an average of six lessons are presented. A preparatory exam is administered along with a quiz covering previous cycles. The sixth cycle is dedicated to an academic review of all previous lesson content, the final comprehensive exam, and the oral examination boards. In conjunction with continuing training, technicians receive additional company required training, providing a substantial cost savings to WHC. WHC employs approximately 300 RCTs.

  3. 76 FR 5319 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-31

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control District, Placer County Air Pollution Control District, Antelope Valley Air Quality Management District, and Ventura County Air Pollution Control District AGENCY: Environmental Protection Agency...

  4. 76 FR 5277 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-31

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control District, Antelope Valley Air Quality Management District, Ventura County Air Pollution Control District and Placer County Air Pollution Control District AGENCY: Environmental Protection Agency...

  5. [Colonoscopy quality control as a requirement of colorectal cancer screening].

    PubMed

    Quintero, Enrique; Alarcón-Fernández, Onofre; Jover, Rodrigo

    2013-11-01

    The strategies used in population-based colorectal screening strategies culminate in colonoscopy and consequently the success of these programs largely depends on the quality of this diagnostic test. The main factors to consider when evaluating quality are scientific-technical quality, safety, patient satisfaction, and accessibility. Quality indicators allow variability among hospitals, endoscopy units and endoscopists to be determined and can identify those not achieving recommended standards. In Spain, the working group for colonoscopy quality of the Spanish Society of Gastroenterology and the Spanish Society of Gastrointestinal Endoscopy have recently drawn up a Clinical Practice Guideline that contains the available evidence on the quality of screening colonoscopy, as well as the basic requirements that must be met by endoscopy units and endoscopists carrying out this procedure. The implementation of training programs and screening colonoscopy quality controls are strongly recommended to guarantee the success of population-based colorectal cancer screening.

  6. Quality Control in Small Groups

    NASA Astrophysics Data System (ADS)

    Lemmens, L. F.

    2008-11-01

    The smallness of some groups in a set up to control the quality of a service using questionnaires limits the size of the samples, this limitation has several consequences. Indeed the common approach used for relatively large groups, based on the central limit theorem and the law of large numbers, cannot be used anymore to construct estimators for the parameters of the model. Using an inverse probability will lift these restrictions. A questionnaire is a collection of items. In an item the respondent indicates on a Likert scale his or her agreement with a statement. Dimensions are a set of items dealing with one aspect of the service. In a questionnaire several dimensions are addressed but usually the items are presented in a random sequence. The model for an item is hierarchical with following components: a multivariate hypergeometric model takes the sampling in a finite population into account, the multinomial serves as a prior for the sampling and the Dirichlet-distribution serves as a prior for the multinomials. The composition of dimensions allows to use the posterior for one of the items as a prior for another item of that dimension and so on. After analysis of several questionnaires using this model, the reliability of the responses from some respondents turned out to be a key-problem, in the sense the responses can be classified into at least two classes and a decision rule had to be developed to neglect some of them. The influence of rejecting some answers, on the confidence for the most plausible statement can be estimated. This leads often to the result that there is only minimal evidence for the most probable statement.

  7. Challenges for quality management in implementation, maintenance, and sustainability of research tissue biobanks.

    PubMed

    Schmitt, S; Kynast, K; Schirmacher, P; Herpel, E

    2016-01-01

    Availability of high-quality human tissue samples and access to associated histopathological and clinical data is essential for basic and translational biomedical research, especially in areas of personalized medicine, drug, and biomarker development and mechanistically oriented biomedical research projects. Therefore, it is pivotal to establish and maintain quality-assured tissue biobanks that provide high-quality biomaterial to research thereby increasing the impact and reliability of scientific results. Quality concerns do not only address the biomaterial specimen itself but include all biobanking-related procedures. Tissue biobanks thus face essential challenges that encompass the implementation of adequate structural components, documentation of tissue sample collection and storage (procedures), as well as data and project management and IT. An integral and indispensable component of tissue biobanks is expert-driven evaluation (entry and exit controls) of tissue specimen to guarantee provision of high-quality assured biomaterials.

  8. Colorado Air Quality Control Regulations and Ambient Air Quality Standards.

    ERIC Educational Resources Information Center

    Colorado State Dept. of Health, Denver. Div. of Air Pollution Control.

    Regulations and standards relative to air quality control in Colorado are defined in this publication. Presented first are definitions of terms, a statement of intent, and general provisions applicable to all emission control regulations adopted by the Colorado Air Pollution Control Commission. Following this, three regulations are enumerated: (1)…

  9. 77 FR 35870 - Approval of Air Quality Implementation Plans; Wisconsin; Partial Disapproval of “Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... AGENCY 40 CFR Part 52 Approval of Air Quality Implementation Plans; Wisconsin; Partial Disapproval of ``Infrastructure'' State Implementation Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule...'' State Implementation Plan (SIP). Specifically, we are finalizing the disapproval of portions of...

  10. 75 FR 67450 - Pipeline Safety: Control Room Management Implementation Workshop

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-02

    ... Pipeline and Hazardous Materials Safety Administration Pipeline Safety: Control Room Management... of Pipeline Safety Representatives (NAPSR) on the implementation of pipeline control room management. The workshop is intended to foster an understanding of the Control Room Management Rule issued...

  11. Design and Implementation of Volitional Control Support in Mathematics Courses

    ERIC Educational Resources Information Center

    Kim, ChanMin; Bennekin, Kimberly N.

    2013-01-01

    We designed support for volitional control with four stages for "goal initiation" ("Want it"), "goal formation" ("Plan for it"), "action control" ("Do it"), and "emotion control" ("Finish it") based on theories and models of volition. We implemented the support in…

  12. The simcyp population based simulator: architecture, implementation, and quality assurance.

    PubMed

    Jamei, Masoud; Marciniak, Steve; Edwards, Duncan; Wragg, Kris; Feng, Kairui; Barnett, Adrian; Rostami-Hodjegan, Amin

    2013-01-01

    Developing a user-friendly platform that can handle a vast number of complex physiologically based pharmacokinetic and pharmacodynamic (PBPK/PD) models both for conventional small molecules and larger biologic drugs is a substantial challenge. Over the last decade the Simcyp Population Based Simulator has gained popularity in major pharmaceutical companies (70% of top 40 - in term of R&D spending). Under the Simcyp Consortium guidance, it has evolved from a simple drug-drug interaction tool to a sophisticated and comprehensive Model Based Drug Development (MBDD) platform that covers a broad range of applications spanning from early drug discovery to late drug development. This article provides an update on the latest architectural and implementation developments within the Simulator. Interconnection between peripheral modules, the dynamic model building process and compound and population data handling are all described. The Simcyp Data Management (SDM) system, which contains the system and drug databases, can help with implementing quality standards by seamless integration and tracking of any changes. This also helps with internal approval procedures, validation and auto-testing of the new implemented models and algorithms, an area of high interest to regulatory bodies.

  13. Quality control education in the community college

    NASA Technical Reports Server (NTRS)

    Greene, J. Griffen; Wilson, Steve

    1966-01-01

    This paper describes the Quality Control Program at Daytona Beach Junior College, including course descriptions. The program in quality control required communication between the college and the American Society for Quality Control (ASQC). The college has machinery established for certification of the learning process, and the society has the source of teachers who are competent in the technical field and who are the employers of the educational products. The associate degree for quality control does not have a fixed program, which can serve all needs, any more than all engineering degrees have identical programs. The main ideas which would be common to all quality control programs are the concept of economic control of a repetitive process and the concept of developing individual potentialities into individuals who are needed and productive.

  14. Air Quality in Mexico City: Policies Implemented for its Improvement

    NASA Astrophysics Data System (ADS)

    Paramo, V.

    2007-12-01

    stringent emission levels of the gasoline fleet; update the detention of pollutant vehicles program; partial exemption of the inspection and maintenance program for cleaner and or highly efficient vehicles; substitution of 3,000 microbuses, 40,000 taxis and 1,200 buses; commissioning of the first Bus Rapid Transit system; implementation of a program for the emissions reduction for the 300 most polluted industrial facilities; and continuous update of the air quality environmental management programs. To continue improving the air quality in the MCMA, the environmental authorities will continue the implementation of the 2002-2010 Air Quality Improvement Program. In 2007 the Green Program was started, this includes those actions that have proven to be effective reduction of pollutant emissions and incorporates new actions for the reduction of local and global pollutant emissions. The most important of these new actions are: substitution of 9,500 microbuses; renewal of all the taxis fleet; commissioning of 10 Bus Rapid Transit lines; commissioning of Line 12 of the underground system; schedules and routes limitations to the cargo fleet; increase 5 percent the number of non-motorized trips (bicycling and walking); regulation of the private public transport passenger stops; requirement of private schools to provide school transport; regulation of non-occupied taxis in circulation; modifications to the circulation of 350 critical crossing points in the city; adoption of intelligent traffic lights systems; complete substitution of the local government vehicle's fleet; implement the inspection and maintenance of the cargo fleet; introduction of low- sulfur diesel, among other measures.

  15. Quality Control Technician Curriculum. An Elusive Butterfly.

    ERIC Educational Resources Information Center

    Holler, Michael

    Defining and developing a quality control technician curriculum for an associate degree program is a difficult and puzzling job. There are as many definitions of quality control and curriculum ideas as there are educators asked. However, one could start by dividing the field into its major areas--heavy manufacturing, maintenance, research, and…

  16. 30 CFR 74.6 - Quality control.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Quality control. 74.6 Section 74.6 Mineral... of the CMDPSU will be maintained in production through adequate quality control procedures, MSHA and... DUST SAMPLING DEVICES Approval Requirements for Coal Mine Dust Personal Sampler Unit § 74.6...

  17. 30 CFR 74.6 - Quality control.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Quality control. 74.6 Section 74.6 Mineral... of the CMDPSU will be maintained in production through adequate quality control procedures, MSHA and... DUST SAMPLING DEVICES Approval Requirements for Coal Mine Dust Personal Sampler Unit § 74.6...

  18. 30 CFR 74.6 - Quality control.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Quality control. 74.6 Section 74.6 Mineral... of the CMDPSU will be maintained in production through adequate quality control procedures, MSHA and... DUST SAMPLING DEVICES Approval Requirements for Coal Mine Dust Personal Sampler Unit § 74.6...

  19. 30 CFR 74.6 - Quality control.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Quality control. 74.6 Section 74.6 Mineral... of the CMDPSU will be maintained in production through adequate quality control procedures, MSHA and... DUST SAMPLING DEVICES Approval Requirements for Coal Mine Dust Personal Sampler Unit § 74.6...

  20. 30 CFR 74.6 - Quality control.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Quality control. 74.6 Section 74.6 Mineral... of the CMDPSU will be maintained in production through adequate quality control procedures, MSHA and... DUST SAMPLING DEVICES Approval Requirements for Coal Mine Dust Personal Sampler Unit § 74.6...

  1. Westinghouse Hanford Company quality assurance program and implementation plan

    SciTech Connect

    Moss, S.S., Westinghouse Hanford

    1996-07-01

    This is the first revision of the Quality AssurancePlan/Implementation Plan (QAP/IP) for nuclear facilities managedand operated by the Westinghouse Hanford Company (WHC).Development of the initial IP required review of the WHC qualityassurance program to the requirements of the 10 CFR 830.120, andcompletion of initial baseline assessments against the QAP toverify implementation of the program. Each WHC-managed nuclearfacility provided a stand-alone section to the QAP/IP, describingits mission and life-cycle status. WHC support organizationsalso performed assessments for their lead areas, and providedinputs to a separate stand-alone section with the initialbaseline assessment results. In this first revision, the initialbaseline matrixes for those facilities found to be in compliancewith the QAP have been removed. Tank Waste Remediation System(TWRS) and K Basins have modified their baseline matrixes to showcompletion of action items to date. With the followingexceptions, the WHC-managed nuclear facilities and their supportorganizations were found to have implemented QA programs thatsatisfy the requirements of 10 CFR 830.120. TWRS identifiedImplementation Plan Action Items having to do with: generationand revision of as-built drawings; updating TWRS organizationaland program documents; tracking the condition/age ofmaterials/equipment; and reconstitution of design bases forexisting, active facilities. No incremental funding needs wereidentified for FY95. For FY97, TWRS identified incrementalfunding in the amount of $65,000 for as-built drawings, and$100,000 for tracking the age/condition of materials/equipment.The K Basin Fuel Storage Facility identified Implementation PlanAction Items having to do with: training; updating procedures;establishing configuration management; reconstituting designbases; and providing darwings; and developing integrated,resource-loaded schedules. Incremental funding needs in theamount of $1.7 million were identified, over a time

  2. 76 FR 9655 - Approval and Promulgation of Air Quality Implementation Plans; Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Illinois AGENCY...) for purposes of attaining the 1997 8-hour ozone National Ambient Air Quality Standard (NAAQS or..., as demonstrated by complete, quality-assured air quality data, without the implementation of...

  3. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... revisions to the Butte County Air Quality Management District (BCAQMD) and Sacramento Metropolitan...

  4. Water Quality Control, Curriculum Guide.

    ERIC Educational Resources Information Center

    Washington City Board of Education, NC.

    Activities which study how water is used, contaminated, and treated or purified are presented in this curriculum guide, culminating in the investigation of a local water quality problem. Designed as a 12 week mini-course for students in grades eight and nine, the guide first presents a review of the content, objectives, major concepts, and sources…

  5. Advanced Quality Control Theory for Training and Education: A Guide to Optimizing Training and Education Efforts

    ERIC Educational Resources Information Center

    Heppler, Brad

    2008-01-01

    This is a book about quality and how to control quality through deliberate actions on the part of the professionals developing and implementing the instances of instruction available at an organization. Quality control theory favors no particular learning philosophy and is only directed towards aspects of how, what, where and when measurements are…

  6. Power inverter implementing phase skipping control

    DOEpatents

    Somani, Utsav; Amirahmadi, Ahmadreza; Jourdan, Charles; Batarseh, Issa

    2016-10-18

    A power inverter includes a DC/AC inverter having first, second and third phase circuitry coupled to receive power from a power source. A controller is coupled to a driver for each of the first, second and third phase circuitry (control input drivers). The controller includes an associated memory storing a phase skipping control algorithm, wherein the controller is coupled to receive updating information including a power level generated by the power source. The drivers are coupled to control inputs of the first, second and third phase circuitry, where the drivers are configured for receiving phase skipping control signals from the controller and outputting mode selection signals configured to dynamically select an operating mode for the DC/AC inverter from a Normal Control operation and a Phase Skipping Control operation which have different power injection patterns through the first, second and third phase circuitry depending upon the power level.

  7. Flying qualities criteria and flight control design

    NASA Technical Reports Server (NTRS)

    Berry, D. T.

    1981-01-01

    Despite the application of sophisticated design methodology, newly introduced aircraft continue to suffer from basic flying qualities deficiencies. Two recent meetings, the DOD/NASA Workshop on Highly Augmented Aircraft Criteria and the NASA Dryden Flight Research Center/Air Force Flight Test Center/AIAA Pilot Induced Oscillation Workshop, addressed this problem. An overview of these meetings is provided from the point of view of the relationship between flying qualities criteria and flight control system design. Among the items discussed are flying qualities criteria development, the role of simulation, and communication between flying qualities specialists and control system designers.

  8. Implementation of an Intelligent Control System

    DTIC Science & Technology

    1992-05-01

    neural network procedures are used to initialize the ANZA board, initialize a network structure. load pre- trained weights, put input data into the...future to allow us to implement neural networks in real time. Diagnostic Computer A commercially available expert system shell. G2M from Gensym , was

  9. Implementing clinical governance in English primary care groups/trusts: reconciling quality improvement and quality assurance

    PubMed Central

    Campbell, S; Sheaff, R; Sibbald, B; Marshall, M; Pickard, S; Gask, L; Halliwell, S; Rogers, A; Roland, M

    2002-01-01

    Objectives: To investigate the concept of clinical governance being advocated by primary care groups/trusts (PCG/Ts), approaches being used to implement clinical governance, and potential barriers to its successful implementation in primary care. Design: Qualitative case studies using semi-structured interviews and documentation review. Setting: Twelve purposively sampled PCG/Ts in England. Participants: Fifty senior staff including chief executives, clinical governance leads, mental health leads, and lay board members. Main outcome measures: Participants' perceptions of the role of clinical governance in PCG/Ts. Results: PCG/Ts recognise that the successful implementation of clinical governance in general practice will require cultural as well as organisational changes, and the support of practices. They are focusing their energies on supporting practices and getting them involved in quality improvement activities. These activities include, but move beyond, conventional approaches to quality assessment (audit, incentives) to incorporate approaches which emphasise corporate and shared learning. PCG/Ts are also engaged in setting up systems for monitoring quality and for dealing with poor performance. Barriers include structural barriers (weak contractual levers to influence general practices), resource barriers (perceived lack of staff or money), and cultural barriers (suspicion by practice staff or problems overcoming the perceived blame culture associated with quality assessment). Conclusion: PCG/Ts are focusing on setting up systems for implementing clinical governance which seek to emphasise developmental and supportive approaches which will engage health professionals. Progress is intentionally incremental but formidable challenges lie ahead, not least reconciling the dual role of supporting practices while monitoring (and dealing with poor) performance. PMID:12078380

  10. Implementation of Adaptive Digital Controllers on Programmable Logic Devices

    NASA Technical Reports Server (NTRS)

    Gwaltney, David A.; King, Kenneth D.; Smith, Keary J.; Montenegro, Justino (Technical Monitor)

    2002-01-01

    Much has been made of the capabilities of Field Programmable Gate Arrays (FPGA's) in the hardware implementation of fast digital signal processing functions. Such capability also makes an FPGA a suitable platform for the digital implementation of closed loop controllers. Other researchers have implemented a variety of closed-loop digital controllers on FPGA's. Some of these controllers include the widely used Proportional-Integral-Derivative (PID) controller, state space controllers, neural network and fuzzy logic based controllers. There are myriad advantages to utilizing an FPGA for discrete-time control functions which include the capability for reconfiguration when SRAM- based FPGA's are employed, fast parallel implementation of multiple control loops and implementations that can meet space level radiation tolerance requirements in a compact form-factor. Generally, a software implementation on a Digital Signal Processor (DSP) device or microcontroller is used to implement digital controllers. At Marshall Space Flight Center, the Control Electronics Group has been studying adaptive discrete-time control of motor driven actuator systems using DSP devices. While small form factor, commercial DSP devices are now available with event capture, data conversion, Pulse Width Modulated (PWM) outputs and communication peripherals, these devices are not currently available in designs and packages which meet space level radiation requirements. In general, very few DSP devices are produced that are designed to meet any level of radiation tolerance or hardness. An alternative is required for compact implementation of such functionality to withstand the harsh environment encountered on spacemap. The goal of this effort is to create a fully digital, flight ready controller design that utilizes an FPGA for implementation of signal conditioning for control feedback signals, generation of commands to the controlled system, and hardware insertion of adaptive-control algorithm

  11. Implementation of Adaptive Digital Controllers on Programmable Logic Devices

    NASA Technical Reports Server (NTRS)

    Gwaltney, David A.; King, Kenneth D.; Smith, Keary J.; Monenegro, Justino (Technical Monitor)

    2002-01-01

    Much has been made of the capabilities of FPGA's (Field Programmable Gate Arrays) in the hardware implementation of fast digital signal processing. Such capability also makes an FPGA a suitable platform for the digital implementation of closed loop controllers. Other researchers have implemented a variety of closed-loop digital controllers on FPGA's. Some of these controllers include the widely used proportional-integral-derivative (PID) controller, state space controllers, neural network and fuzzy logic based controllers. There are myriad advantages to utilizing an FPGA for discrete-time control functions which include the capability for reconfiguration when SRAM-based FPGA's are employed, fast parallel implementation of multiple control loops and implementations that can meet space level radiation tolerance requirements in a compact form-factor. Generally, a software implementation on a DSP (Digital Signal Processor) or microcontroller is used to implement digital controllers. At Marshall Space Flight Center, the Control Electronics Group has been studying adaptive discrete-time control of motor driven actuator systems using digital signal processor (DSP) devices. While small form factor, commercial DSP devices are now available with event capture, data conversion, pulse width modulated (PWM) outputs and communication peripherals, these devices are not currently available in designs and packages which meet space level radiation requirements. In general, very few DSP devices are produced that are designed to meet any level of radiation tolerance or hardness. The goal of this effort is to create a fully digital, flight ready controller design that utilizes an FPGA for implementation of signal conditioning for control feedback signals, generation of commands to the controlled system, and hardware insertion of adaptive control algorithm approaches. An alternative is required for compact implementation of such functionality to withstand the harsh environment

  12. NASE 2015: Implementation of a Management Quality System

    NASA Astrophysics Data System (ADS)

    Ros, Rosa Maria; García, Beatriz; Santa Maria, Delia

    2015-08-01

    ISO 29990:2010, Learning services for non-formal education and training - Basic requirements for service providers, proposes enhance transparency and allow comparison on a worldwide basis of learning services, offering a single alternative backed by international consensus to the huge variety of national service and management standards which now exists in the field of non-formal learning. The objective of ISO 29990:2010 is to provide a generic model for quality professional practice and performance, and a common reference for learning service providers and their clients in the design, development and delivery of non-formal education, training and development.NASE project, which was born as a consequence of the implementation of IAU-10 Years Strategic Plan and it is in agreement with the proposal to increase the interest and efforts of IAU on schools before the university and constitutes good objective for the implementation of ISO 29990-2010.Taking into account the main objectives of the Strategic Plan, it is possible to remark that NASE acts on all the education levels, and had, during the past 5 years a big impact because Ministries of Education, Universities and Planetariums are involved. After 5 years NASE organized more than 60 courses in about 20 countries distributed in America, Africa, Asia and Europe. In many countries local governments changed their curriculum according NASE course contents (i.e. Nicaragua, Argentina and Honduras).The knowledge obtained by teachers is evaluated by the department of education of the local government or universities who participated. NASE acts as part of the Professional formation of Professors in Science and in this sense is a Program directed to the Tertiary and University Education.After 5 years of development, we present the implementation of a Quality Management System, according to ISO 29990:2010, devoted to Learning services for non-formal education and training. Basic requirements for service providers, and show

  13. Design requirements for SRB production control system. Volume 4: Implementation

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The implementation plan which is presented was developed to provide the means for the successful implementation of the automated production control system. There are three factors which the implementation plan encompasses: detailed planning; phased implementation; and user involvement. The plan is detailed to the task level in terms of necessary activities as the system is developed, refined, installed, and tested. These tasks are scheduled, on a preliminary basis, over a two-and-one-half-year time frame.

  14. Sunway Medical Laboratory Quality Control Plans Based on Six Sigma, Risk Management and Uncertainty.

    PubMed

    Jairaman, Jamuna; Sakiman, Zarinah; Li, Lee Suan

    2017-03-01

    Sunway Medical Centre (SunMed) implemented Six Sigma, measurement uncertainty, and risk management after the CLSI EP23 Individualized Quality Control Plan approach. Despite the differences in all three approaches, each implementation was beneficial to the laboratory, and none was in conflict with another approach. A synthesis of these approaches, built on a solid foundation of quality control planning, can help build a strong quality management system for the entire laboratory.

  15. Implementation of Adaptive Digital Controllers on Programmable Logic Devices

    NASA Technical Reports Server (NTRS)

    Gwaltney, David A.; King, Kenneth D.; Smith, Keary J.; Ormsby, John (Technical Monitor)

    2002-01-01

    Much has been made of the capabilities of FPGA's (Field Programmable Gate Arrays) in the hardware implementation of fast digital signal processing (DSP) functions. Such capability also makes and FPGA a suitable platform for the digital implementation of closed loop controllers. There are myriad advantages to utilizing an FPGA for discrete-time control functions which include the capability for reconfiguration when SRAM- based FPGA's are employed, fast parallel implementation of multiple control loops and implementations that can meet space level radiation tolerance in a compact form-factor. Other researchers have presented the notion that a second order digital filter with proportional-integral-derivative (PID) control functionality can be implemented in an FPGA. At Marshall Space Flight Center, the Control Electronics Group has been studying adaptive discrete-time control of motor driven actuator systems using digital signal processor (DSF) devices. Our goal is to create a fully digital, flight ready controller design that utilizes an FPGA for implementation of signal conditioning for control feedback signals, generation of commands to the controlled system, and hardware insertion of adaptive control algorithm approaches. While small form factor, commercial DSP devices are now available with event capture, data conversion, pulse width modulated outputs and communication peripherals, these devices are not currently available in designs and packages which meet space level radiation requirements. Meeting our goals requires alternative compact implementation of such functionality to withstand the harsh environment encountered on spacecraft. Radiation tolerant FPGA's are a feasible option for reaching these goals.

  16. Toward standardising gamma camera quality control procedures

    NASA Astrophysics Data System (ADS)

    Alkhorayef, M. A.; Alnaaimi, M. A.; Alduaij, M. A.; Mohamed, M. O.; Ibahim, S. Y.; Alkandari, F. A.; Bradley, D. A.

    2015-11-01

    Attaining high standards of efficiency and reliability in the practice of nuclear medicine requires appropriate quality control (QC) programs. For instance, the regular evaluation and comparison of extrinsic and intrinsic flood-field uniformity enables the quick correction of many gamma camera problems. Whereas QC tests for uniformity are usually performed by exposing the gamma camera crystal to a uniform flux of gamma radiation from a source of known activity, such protocols can vary significantly. Thus, there is a need for optimization and standardization, in part to allow direct comparison between gamma cameras from different vendors. In the present study, intrinsic uniformity was examined as a function of source distance, source activity, source volume and number of counts. The extrinsic uniformity and spatial resolution were also examined. Proper standard QC procedures need to be implemented because of the continual development of nuclear medicine imaging technology and the rapid expansion and increasing complexity of hybrid imaging system data. The present work seeks to promote a set of standard testing procedures to contribute to the delivery of safe and effective nuclear medicine services.

  17. HETDEX tracker control system design and implementation

    NASA Astrophysics Data System (ADS)

    Beno, Joseph H.; Hayes, Richard; Leck, Ron; Penney, Charles; Soukup, Ian

    2012-09-01

    To enable the Hobby-Eberly Telescope Dark Energy Experiment, The University of Texas at Austin Center for Electromechanics and McDonald Observatory developed a precision tracker and control system - an 18,000 kg robot to position a 3,100 kg payload within 10 microns of a desired dynamic track. Performance requirements to meet science needs and safety requirements that emerged from detailed Failure Modes and Effects Analysis resulted in a system of 13 precision controlled actuators and 100 additional analog and digital devices (primarily sensors and safety limit switches). Due to this complexity, demanding accuracy requirements, and stringent safety requirements, two independent control systems were developed. First, a versatile and easily configurable centralized control system that links with modeling and simulation tools during the hardware and software design process was deemed essential for normal operation including motion control. A second, parallel, control system, the Hardware Fault Controller (HFC) provides independent monitoring and fault control through a dedicated microcontroller to force a safe, controlled shutdown of the entire system in the event a fault is detected. Motion controls were developed in a Matlab-Simulink simulation environment, and coupled with dSPACE controller hardware. The dSPACE real-time operating system collects sensor information; motor commands are transmitted over a PROFIBUS network to servo amplifiers and drive motor status is received over the same network. To interface the dSPACE controller directly to absolute Heidenhain sensors with EnDat 2.2 protocol, a custom communication board was developed. This paper covers details of operational control software, the HFC, algorithms, tuning, debugging, testing, and lessons learned.

  18. Development of the supply chain oriented quality assurance system for aerospace manufacturing SMEs and its implementation perspectives

    NASA Astrophysics Data System (ADS)

    Hussein, Abdullahi; Cheng, Kai

    2016-10-01

    Aerospace manufacturing SMEs are continuously facing the challenge on managing their supply chain and complying with the aerospace manufacturing quality standard requirement due to their lack of resources and the nature of business. In this paper, the ERP system based approach is presented to quality control and assurance work in light of seamless integration of in-process production data and information internally and therefore managing suppliers more effectively and efficiently. The Aerospace Manufacturing Quality Assurance Standard (BS/EN9100) is one of the most recognised and essential protocols for developing the industry-operated-and-driven quality assurance systems. The research investigates using the ERP based system as an enabler to implement BS/EN9100 quality management system at manufacturing SMEs and the associated implementation and application perspectives. An application case study on a manufacturing SME is presented by using the SAP based implementation, which helps further evaluate and validate the approach and application system development.

  19. Transitioning sediment quality assessment into regulations: Challenges and solutions in implementing California's sediment quality objectives.

    PubMed

    Beegan, Chris; Bay, Steven M

    2012-10-01

    Development and promulgation of sediment quality criteria represents a substantial challenge for water quality agencies. Unlike water quality programs that rely on individual chemical thresholds to assess water quality, the complex processes affecting contaminant bioavailability in sediments preclude the use of contaminant concentrations to independently assess impacts or identify cause. Various multiple line of evidence approaches (e.g., sediment quality triad) have been developed for sediment quality assessment, but such frameworks are rarely fully incorporated into statewide regulatory programs due to a lack of standardized and validated tools. In 2003, California's State Water Resources Control Board (State Water Board) initiated development of sediment quality criteria and an assessment framework that required the developers to resolve many challenging technical and policy related issues to the satisfaction of stakeholders, scientists, and the general public. The first part of this multiyear effort has been completed and resulted in the development and validation of an integrated collection of tools, thresholds, and a data interpretation framework for assessing sediment contamination impacts on benthic community condition. The State Water Board's narrative sediment quality criteria and assessment framework became effective in 2009, following US Environmental Protection Agency approval. The results of this effort are described in a series of 6 articles published in this issue of Integrated Environmental Assessment and Management. The articles describe: 1) a multiple line of evidence framework for data integration and assessment, 2) calibration and evaluation of sediment quality guidelines for predicting toxic responses, 3) development and evaluation of sediment quality guidelines with respect to benthic macrofauna responses, 4) selection of toxicity test methods and thresholds, 5) identification and characterization of benthic community assemblages, 6) the

  20. Implementation of a self-controlling heater

    NASA Technical Reports Server (NTRS)

    Strange, M. G.

    1973-01-01

    Temperature control of radiation sensors, targets, and other critical components is a common requirement in modern scientific instruments. Conventional control systems use a heater and a temperature sensor mounted on the body to be controlled. For proportional control, the sensor provides feedback to circuitry which drives the heater with an amount of power proportional to the temperature error. It is impractical or undesirable to mount both a heater and a sensor on certain components such as ultra-small parts or thin filaments. In principle, a variable current through the element is used for heating, and the change in voltage drop due to the element's temperature coefficient is separated and used to monitor or control its own temperature. Since there are no thermal propagation delays between heater and sensor, such control systems are exceptionally stable.

  1. Striving for Quality Control in Distance Education.

    ERIC Educational Resources Information Center

    Leh, Amy S. C.; Jobin, Andrianna

    2002-01-01

    Discussion of the benefits and drawbacks of distance education and online instruction in higher education focuses on quality control. Topics include quality of product, of learning, and of technology; student prerequisites; instructional design; faculty support systems; and program design, including professional development versus academic degree…

  2. Quality or Control? Management in Higher Education

    ERIC Educational Resources Information Center

    Milliken, John; Colohan, Gerry

    2004-01-01

    Over the past fifteen years the rationale, organisational infrastructure and delivery of social policy in Britain have undergone radical transformation. Whereas efficiency was the key word of the 1980s, quality was the touchstone of the 1990s and quality control with accountability has become the management philosophy of the new millennium.…

  3. 78 FR 64430 - Partial Approval and Disapproval of Air Quality State Implementation Plans; Nevada...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... AGENCY 40 CFR part 52 Partial Approval and Disapproval of Air Quality State Implementation Plans; Nevada... entitled ``Partial Approval and Disapproval of Air Quality Implementation Plans; Nevada; Infrastructure.... SUMMARY: EPA is proposing to partially approve and partially disapprove State Implementation Plan...

  4. Quality Control Guidelines for SAM Radiochemical Methods

    EPA Pesticide Factsheets

    Learn more about quality control guidelines and recommendations for the analysis of samples using the radiochemistry methods listed in EPA's Selected Analytical Methods for Environmental Remediation and Recovery (SAM).

  5. Quality Control Guidelines for SAM Biotoxin Methods

    EPA Pesticide Factsheets

    Learn more about quality control guidelines and recommendations for the analysis of samples using the pathogen methods listed in EPA's Selected Analytical Methods for Environmental Remediation and Recovery (SAM).

  6. Quality Control Guidelines for SAM Pathogen Methods

    EPA Pesticide Factsheets

    Learn more about quality control guidelines and recommendations for the analysis of samples using the biotoxin methods listed in EPA's Selected Analytical Methods for Environmental Remediation and Recovery (SAM).

  7. Quality Control Guidelines for SAM Chemical Methods

    EPA Pesticide Factsheets

    Learn more about quality control guidelines and recommendations for the analysis of samples using the chemistry methods listed in EPA's Selected Analytical Methods for Environmental Remediation and Recovery (SAM).

  8. Quality Control Systems in Cardiac Aging

    PubMed Central

    Quarles, Ellen K; Dai, Dao-Fu; Tocchi, Autumn; Basisty, Nathan; Gitari, Lemuel; Rabinovitch, Peter S

    2015-01-01

    Cardiac aging is an intrinsic process that results in impaired cardiac function, along with cellular and molecular changes. These degenerative changes are intimately associated with quality control mechanisms. This review provides a general overview of the clinical and cellular changes which manifest in cardiac aging, and the quality control mechanisms involved in maintaining homeostasis and retarding aging. These mechanisms include autophagy, ubiquitin-mediated turnover, apoptosis, mitochondrial quality control and cardiac matrix homeostasis. Finally, we discuss aging interventions that have been observed to impact cardiac health outcomes. These include caloric restriction, rapamycin, resveratrol, GDF11, mitochondrial antioxidants and cardiolipin-targeted therapeutics. A greater understanding of the quality control mechanisms that promote cardiac homeostasis will help to understand the benefits of these interventions, and hopefully lead to further improved therapeutic modalities. PMID:25702865

  9. Ribosome-associated protein quality control

    PubMed Central

    Brandman, Onn; Hegde, Ramanujan S

    2016-01-01

    Protein synthesis by the ribosome can fail for numerous reasons including faulty mRNA, insufficient availability of charged tRNAs and genetic errors. All organisms have evolved mechanisms to recognize stalled ribosomes and initiate pathways for recycling, quality control and stress signaling. Here we review the discovery and molecular dissection of the eukaryotic ribosome-associated quality-control pathway for degradation of nascent polypeptides arising from interrupted translation. PMID:26733220

  10. Real-Time Implementation of Type-2 FLC-Based Shunt Active Filter Control Strategies (p-q and Id-Iq) with Different Fuzzy MFs for Power Quality Improvement

    NASA Astrophysics Data System (ADS)

    Mikkili, Suresh; Panda, Anup Kumar

    2014-06-01

    This research article proposes the shunt active filter (SHAF) control strategies (p-q and Id-Iq), which are used to improve the power quality of the electrical network by mitigating the harmonics with the help of Type-2 fuzzy logic controller (Type-2 FLC) different membership functions (MFs). Three-phase reference current waveforms generated by proposed scheme are tracked by the three-phase voltage source converter in a hysteresis band control scheme. The performance of the proposed control strategies has been evaluated in terms of harmonic mitigation and DC link voltage regulation under various source conditions. In order to maintain DC link voltage constant and to generate the compensating reference currents, we have developed Type-2 FLC with different fuzzy MFs (trapezoidal, triangular and Gaussian). The SHAF with proposed Type-2 FLC using Gaussian MF is able to eliminate the uncertainty in the system and SHAF gains outstanding compensation abilities. The detailed real-time results using real-time digital simulator are presented to support the feasibility of proposed control strategies.

  11. Air quality improvements following implementation of Lisbon's Low Emission Zone

    NASA Astrophysics Data System (ADS)

    Ferreira, F.; Gomes, P.; Tente, H.; Carvalho, A. C.; Pereira, P.; Monjardino, J.

    2015-12-01

    Air pollution levels within Lisbon city limits have been exceeding the limit values established in European Union and national legislation since 2001, with the most problematic cases related to the levels of fine particles (PM10) and nitrogen dioxide (NO2), mainly originated by road traffic. With the objective of answering this public health issue, an Air Quality Action Plan was developed in 2006 and the respective Enforcement Plan was published in 2009. From the overall strategy, one of the major measures presented in this strategy was the creation of a Low Emission Zone (LEZ) in Lisbon, which has been operating since July 2011. Implemented at different stages it has progressively expanded its area, including more vehicle types and adopting more stringent requirements in terms of minimum emission standards (currently LEZ phase 2 with EURO 2 in the city center - zone 1 and EURO 1 in the rest of the LEZ area - zone 2). At the same time the road axis comprised of Marquês de Pombal square and Avenida da Liberdade was subjected to profound changes in its traffic circulation model, reducing road traffic volumes. The analysis of the air quality data before and after the LEZ phase 2 has shown positive evolution when comparing the period between 2011 (before measures) and 2013 (after measures). In 2013, there was a reduction in PM10 annual average concentration of 23% and NO2 annual average concentrations of 12%, compared with the year 2011. Although PM10 reductions were more significant inside the LEZ area, the same was not valid for NO2, suggesting that the implementation of these measures was not as effective in reducing NO2 levels as shown by results in other cities like Berlin and London. The results from road traffic characterization indicate a relevant effect on fleet renewal with an overall decrease in the relative weight of pre-EURO 2 vehicles in 2012/2013, compared with data from 2011. An important increase in the share of EURO 4 and EURO 5 vehicles was also

  12. 78 FR 63878 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revised Ambient Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revised Ambient Air Quality Standards for Fine Particulate Matter AGENCY: Environmental Protection Agency (EPA... Commonwealth of Virginia State Implementation Plan (SIP). The revisions add ambient air quality standards...

  13. 78 FR 34972 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revision to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revision to the Classification and Implementation of the 2008 Ozone National Ambient Air Quality Standards for... amendment to the 1997 National Ambient Air Quality Standards (NAAQS) for ozone for the purposes...

  14. Roadmap to an effective quality improvement and patient safety program implementation in a rural hospital setting.

    PubMed

    Ingabire, Willy; Reine, Petera M; Hedt-Gauthier, Bethany L; Hirschhorn, Lisa R; Kirk, Catherine M; Nahimana, Evrard; Nepomscene Uwiringiyemungu, Jean; Ndayisaba, Aphrodis; Manzi, Anatole

    2015-12-01

    Implementation lessons: (1) implementation of an effective quality improvement and patient safety program in a rural hospital setting requires collaboration between hospital leadership, Ministry of Health and other stakeholders. (2) Building Quality Improvement (QI) capacity to develop engaged QI teams supported by mentoring can improve quality and patient safety.

  15. 76 FR 36873 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-23

    ..., quality assured, quality controlled, and certified ambient air monitoring data for the years 2008-2010... quality assured, quality controlled, and certified ambient air monitoring data showing that the Atlanta... 8- hour ozone national ambient air quality standards (NAAQS) based on quality assured,...

  16. Quality assurance and quality control in clinical cytogenetics.

    PubMed

    Mikhail, Fady M; Watson, Michael S

    2014-07-14

    The goal of any clinical laboratory should be to provide patients with the most accurate test results possible. This is accomplished through various overlapping programs that continuously monitor and optimize all aspects of a test, including decisions by the laboratory to offer a test, the decision of providers to request the test, the testing itself, and the reporting of results to the referral source and patient. The levels at which test performance and accuracy can be optimized are encompassed under quality control (QC) and quality assurance (QA). The monitoring of QC and QA problems allows for the integration of these parameters into a total quality management program. This unit reviews QC and QA guidelines, in addition to discussing how to establish a quality assurance program.

  17. Nanotechnology and food quality control.

    PubMed

    Mannino, S; Scampicchio, M

    2007-08-01

    The preparation and attractive performance of nanomaterials for innovative detection schemes of food related compounds are described. Nickel nanowires growths by the template procedure were used for magnetoswitchable control of electrochemical processes of sugar-like compounds at the electrode surface. Gold nanoparticles were also prepared by reducing a gold solution with different phenolic compounds. The different antioxidant power of these compounds allow to modulate the kinetic growth of gold nanoparticles. Finally, an index of the antioxidant power based on the growth of gold nanoparticle is reported.

  18. Designing in quality through design control: a manufacturer's perspective.

    PubMed

    Lasky, F D; Boser, R B

    1997-05-01

    Quality by design is a comprehensive program that begins with understanding user needs and continues through (but does not end with) monitoring customer acceptance. Management tools and processes such as ISO 9000 standards and the Food and Drug Administration Quality System Regulations exist to guide medical device manufacturers in quality practices. The goal is to deliver products acceptable for their intended use. Quality control begins with defining attributes ranging from color to accuracy and precision. Failure mode and effects analysis and risk analysis consider both probability and severity of potential malfunctions and their effects on patients or operators. Tools used to implement design and production practices include Program Evaluation and Review Technique (PERT) charts and industry-conceived concepts, such as Six Sigma techniques. Their use varies with manufacturer, depending on product and customer needs and the manufacturer's specific quality practices. Verification confirms that input goals are met. Then, validation assures that intended clinical needs are continually satisfied by establishing adequate production specifications. Conformance is monitored to verify that stable, consistent processes are in place, and precise user instructions enable the device to satisfy its intended use. Finally, complaint tracking can help assess whether needs have been met. Modifications in service, hardware, or instructions (including quality control) might be required. Therefore, both manufacturers and users work in partnership for continual improvement. The manufacturer's knowledge of design, production, and service needs of its devices enable it to recommend appropriate quality-control protocols for clinical testing.

  19. Network-based production quality control

    NASA Astrophysics Data System (ADS)

    Kwon, Yongjin; Tseng, Bill; Chiou, Richard

    2007-09-01

    This study investigates the feasibility of remote quality control using a host of advanced automation equipment with Internet accessibility. Recent emphasis on product quality and reduction of waste stems from the dynamic, globalized and customer-driven market, which brings opportunities and threats to companies, depending on the response speed and production strategies. The current trends in industry also include a wide spread of distributed manufacturing systems, where design, production, and management facilities are geographically dispersed. This situation mandates not only the accessibility to remotely located production equipment for monitoring and control, but efficient means of responding to changing environment to counter process variations and diverse customer demands. To compete under such an environment, companies are striving to achieve 100%, sensor-based, automated inspection for zero-defect manufacturing. In this study, the Internet-based quality control scheme is referred to as "E-Quality for Manufacturing" or "EQM" for short. By its definition, EQM refers to a holistic approach to design and to embed efficient quality control functions in the context of network integrated manufacturing systems. Such system let designers located far away from the production facility to monitor, control and adjust the quality inspection processes as production design evolves.

  20. [Management of quality in an Intensive Care Unit: implementation of ISO 9001:2008 international standard].

    PubMed

    Lorenzo Torrent, R; Sánchez Palacios, M; Santana Cabrera, L; Cobian Martinez, J L; García del Rosario, C

    2010-10-01

    The Quality Management Systems make it possible to prioritize actions to maintain the safety and efficacy of health technologies. The Intensive Care Unit of our hospital has implemented a quality management plan, which has obtained accreditation as "Service Certificate that manages its activities according to UNE-EN ISO 9001:2008" standard. With the application of quality management system, it has been possible to detect the needs that the Service can cover in order to obtain the satisfaction of the patient, relative or health personnel of the other services of the hospital, to improve communications inside and outside of service, to secure greater understanding of the processes of the organization and control of risk, to delimit responsibilities clearly to all the personnel, to make better use of the time and resources and, finally, to improve the motivation of the personnel.

  1. Mindcontrol: A Web Application for Brain Segmentation Quality Control.

    PubMed

    Keshavan, Anisha; Datta, Esha; McDonough, Ian; Madan, Christopher R; Jordan, Kesshi; Henry, Roland G

    2017-03-29

    Tissue classification plays a crucial role in the investigation of normal neural development, brain-behavior relationships, and the disease mechanisms of many psychiatric and neurological illnesses. Ensuring the accuracy of tissue classification is important for quality research and, in particular, the translation of imaging biomarkers to clinical practice. Assessment with the human eye is vital to correct various errors inherent to all currently available segmentation algorithms. Manual quality assurance becomes methodologically difficult at a large scale - a problem of increasing importance as the number of data sets is on the rise. To make this process more efficient, we have developed Mindcontrol, an open-source web application for the collaborative quality control of neuroimaging processing outputs. The Mindcontrol platform consists of a dashboard to organize data, descriptive visualizations to explore the data, an imaging viewer, and an in-browser annotation and editing toolbox for data curation and quality control. Mindcontrol is flexible and can be configured for the outputs of any software package in any data organization structure. Example configurations for three large, open-source datasets are presented: the 1000 Functional Connectomes Project (FCP), the Consortium for Reliability and Reproducibility (CoRR), and the Autism Brain Imaging Data Exchange (ABIDE) Collection. These demo applications link descriptive quality control metrics, regional brain volumes, and thickness scalars to a 3D imaging viewer and editing module, resulting in an easy-to-implement quality control protocol that can be scaled for any size and complexity of study.

  2. 75 FR 18782 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring Requirements for Indianapolis Power and Light--Harding Street Station AGENCY: Environmental... State Implementation Plan alternative monitoring requirements for Indianapolis Power and Light...

  3. The Physician Quality Reporting Initiative: a practical approach to implementing quality reporting.

    PubMed

    Wintz, Ruth; Rosenthal, Brian; Fadem, Stephen Z

    2008-01-01

    The Physician Quality Reporting Initiative (PQRI) is a voluntary program in which Medicare encourages eligible physicians in the United States to report on specific quality measures. This article is a case study of the implementation of PQRI reporting by Kidney Associates, a nephrology practice in Houston, TX. After reviewing and discussing 74 potential measures, the group narrowed the selection to 5 and chose 1 office measure and 2 dialysis measures. PQRI reporting was established through an Encounter Note template that forced a required entry for whether a patient was diabetic. For each diabetic, blood pressures were entered in the template and appropriate G-codes were created, which were then selected and linked with the diabetes International Classification of Diseases, Ninth Revision code and electronically submitted for billing. The dialysis measures were automatically selected from the urea reduction rate and hematocrit (hemoglobin x 3) measures that were received for each patient on a regular basis from a large dialysis chain. Software was developed to parse these data, evaluate them, and generate the appropriate G-codes. At the end of the billing cycle, these data were exported through a standard spreadsheet formatting along with the billing G codes, and claims were submitted. The system was cost-effective to implement, required minimal education, and achieved 100% cooperation through feedback education and rapid correction of systems issues. Kidney Associates was able to show that PQRI reporting is easy to implement with minimal expense and staff labor. Sharing these methods with other practices should facilitate the implementation of efficient reporting systems.

  4. Implementation of Nonlinear Control Laws for an Optical Delay Line

    NASA Technical Reports Server (NTRS)

    Hench, John J.; Lurie, Boris; Grogan, Robert; Johnson, Richard

    2000-01-01

    This paper discusses the implementation of a globally stable nonlinear controller algorithm for the Real-Time Interferometer Control System Testbed (RICST) brassboard optical delay line (ODL) developed for the Interferometry Technology Program at the Jet Propulsion Laboratory. The control methodology essentially employs loop shaping to implement linear control laws. while utilizing nonlinear elements as means of ameliorating the effects of actuator saturation in its coarse, main, and vernier stages. The linear controllers were implemented as high-order digital filters and were designed using Bode integral techniques to determine the loop shape. The nonlinear techniques encompass the areas of exact linearization, anti-windup control, nonlinear rate limiting and modal control. Details of the design procedure are given as well as data from the actual mechanism.

  5. 77 FR 65133 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... Identification of plan. * * * * * (c) * * * (379) * * * (i) * * * (E) Mojave Desert Air Quality Management... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA...

  6. 77 FR 63743 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ... Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the Sacramento Metropolitan Air Quality Management District (SMAQMD) portion of the California State Implementation Plan (SIP). These...

  7. 77 FR 26475 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air Pollution...

  8. 78 FR 21581 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... the Antelope Valley Air Quality Management District (AVAQMD), Monterey Bay Unified Air...

  9. Implementation and Analysis for APR1400 Soft Control System

    SciTech Connect

    2015-07-01

    Due to the rapid advancement of digital technology, the definite technical advantages of digital control system compared to analog control system are accelerating the implementation of advanced distributed digital control system in the nuclear power plant. One of the major advantages of digital control system is the capability of Soft Control System. The design of Soft Control System for Advanced Power Reactor 1400 (APR1400) plant of Man-Machine Interface System (MMIS) is based on full digital technologies to enhance reliability, operability and maintainability. Computer-based compact workstation has been adopted in the APR1400 Main Control Room (MCR) to provide convenient working environment. This paper introduces the approaches and methodologies of Soft Control System for the Advanced Control Room (ACR). This paper also explains major design features for operation and display of the Soft Control System and its implementation to cope with regulatory requirements. (authors)

  10. Quality control of ion torrent sequencing library.

    PubMed

    Pop, Laura-Ancuţa; Puscas, Emil; Pileczki, Valentina; Cojocneanu-Petric, Roxana; Braicu, Cornelia; Achimas-Cadariu, Patriciu; Berindan-Neagoe, Ioana

    2014-01-01

    Next-generation sequencing (NSG) is an important method for gathering large amounts of sequencing data for different types of applications regarding the diagnosis and response to treatment of different diseases. An important step in the NGS process is the quality control of sequencing libraries, which can influence the yield and efficiency of the sequencing run. This study evaluated two different methods for library quality control, Agilent Bioanalyzer and qPCR, and showed that both methods can be used. However, as is the case with any analytical method, they have their limitations. The Agilent Bioanalyzer quantifies only the high quality libraries, but it underestimates their concentration, while qPCR also quantifies lower quality libraries, but it overestimates their concentration.

  11. Strategy to Ensure Institutional Control Implementation at Superfund Sites

    EPA Pesticide Factsheets

    This document sets forth EPA’s strategy (Strategy) for ensuring that institutional controls (ICs) are successfully implemented at Superfund sites, with an emphasis on evaluating ICs at sites where all construction of all remedies is complete (construction complete sites).

  12. 77 FR 11990 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District and Yolo-Solano Air Quality Management District AGENCY: Environmental Protection Agency... Quality Management District (MDAQMD) and Yolo-Solano Air Quality Management District (YSAQMD) portions...

  13. 77 FR 10423 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Amendments to West...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Amendments to West Virginia's Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA... Virginia's Legislative Rule regarding ambient air quality standards (45CSR8- Ambient Air Quality...

  14. 76 FR 44535 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality... proposing to approve revisions to the Northern Sierra Air Quality Management District (NSAQMD),...

  15. 77 FR 60089 - Approval and Promulgation of Air Quality Implementation Plans; Delaware, New Jersey, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-02

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Delaware, New Jersey... 2006 24-hour PM 2.5 National Ambient Air Quality Standard (NAAQS), based upon complete, quality-assured.... What is EPA's analysis of the relevant air quality data? IV. What are the effects of this action?...

  16. 77 FR 12495 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency... the Antelope Valley Air Quality Management District (AVAQMD) and Mojave Desert Air Quality...

  17. 77 FR 12526 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency... Quality Management District (AVAQMD) and Mojave Desert Air Quality Management District (MDAQMD) portion...

  18. 77 FR 71383 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Redesignation of the Ohio...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-30

    ... AGENCY 40 CFR Parts 52 and 81 Approval and Promulgation of Air Quality Implementation Plans; Ohio... attains the 1997 annual PM 2.5 standard, based on the most recent three years of certified air quality...'s plan for maintaining the 1997 annual PM 2.5 National Ambient Air Quality Standard (NAAQS)...

  19. Harmonisation Initiatives of Copernicus Data Quality Control

    NASA Astrophysics Data System (ADS)

    Vescovi, F. D.; Lankester, T.; Coleman, E.; Ottavianelli, G.

    2015-04-01

    The Copernicus Space Component Data Access system (CSCDA) incorporates data contributions from a wide range of satellite missions. Through EO data handling and distribution, CSCDA serves a set of Copernicus Services related to Land, Marine and Atmosphere Monitoring, Emergency Management and Security and Climate Change. The quality of the delivered EO products is the responsibility of each contributing mission, and the Copernicus data Quality Control (CQC) service supports and complements such data quality control activities. The mission of the CQC is to provide a service of quality assessment on the provided imagery, to support the investigation related to product quality anomalies, and to guarantee harmonisation and traceability of the quality information. In terms of product quality control, the CQC carries out analysis of representative sample products for each contributing mission as well as coordinating data quality investigation related to issues found or raised by Copernicus users. Results from the product analysis are systematically collected and the derived quality reports stored in a searchable database. The CQC service can be seen as a privileged focal point with unique comparison capacities over the data providers. The comparison among products from different missions suggests the need for a strong, common effort of harmonisation. Technical terms, definitions, metadata, file formats, processing levels, algorithms, cal/val procedures etc. are far from being homogeneous, and this may generate inconsistencies and confusion among users of EO data. The CSCDA CQC team plays a significant role in promoting harmonisation initiatives across the numerous contributing missions, so that a common effort can achieve optimal complementarity and compatibility among the EO data from multiple data providers. This effort is done in coordination with important initiatives already working towards these goals (e.g. INSPIRE directive, CEOS initiatives, OGC standards, QA4EO

  20. 30 CFR 28.31 - Quality control plans; contents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Quality control plans; contents. 28.31 Section... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.31 Quality control plans; contents. (a) Each quality control plan shall contain provisions for the management of quality, including:...

  1. 30 CFR 28.31 - Quality control plans; contents.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Quality control plans; contents. 28.31 Section... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.31 Quality control plans; contents. (a) Each quality control plan shall contain provisions for the management of quality, including:...

  2. 30 CFR 28.31 - Quality control plans; contents.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Quality control plans; contents. 28.31 Section... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.31 Quality control plans; contents. (a) Each quality control plan shall contain provisions for the management of quality, including:...

  3. 30 CFR 28.31 - Quality control plans; contents.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Quality control plans; contents. 28.31 Section... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.31 Quality control plans; contents. (a) Each quality control plan shall contain provisions for the management of quality, including:...

  4. 30 CFR 28.31 - Quality control plans; contents.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Quality control plans; contents. 28.31 Section... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.31 Quality control plans; contents. (a) Each quality control plan shall contain provisions for the management of quality, including:...

  5. 75 FR 57186 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-20

    ... Quality Planning Purposes; Alabama: Birmingham; Determination of Attaining Data for the 2006 24-Hour Fine... on quality assured, quality controlled monitoring data from 2007-2009. The Birmingham, Alabama, 2006... NAAQS. This clean data determination is based upon complete, quality assured, quality controlled,...

  6. Embedding Quality in E-Learning Implementation through Evaluation

    ERIC Educational Resources Information Center

    Deepwell, Frances

    2007-01-01

    In relation to quality, evaluation is often used synonymously with quality assurance and monitoring processes (Ehlers et al, 2004). However, evaluation has other purposes, such as for development and knowledge (Chelimsky & Shadish, 1997). In this paper, I present a view of evaluation as an instrument of quality enhancement rather than quality…

  7. 34 CFR 200.89 - MEP allocations; Re-interviewing; Eligibility documentation; and Quality control.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... periodic reviews and evaluations indicate a need to do so. (7) A process for implementing corrective action... documentation; and Quality control. 200.89 Section 200.89 Education Regulations of the Offices of the Department...-interviewing; Eligibility documentation; and Quality control. (a) Allocation of funds under the MEP for...

  8. Quality control in the secretory assembly line.

    PubMed Central

    Helenius, A

    2001-01-01

    As a rule, only proteins that have reached a native, folded and assembled structure are transported to their target organelles and compartments within the cell. In the secretory pathway of eukaryotic cells, this type of sorting is particularly important. A variety of molecular mechanisms are involved that distinguish between folded and unfolded proteins, modulate their intracellular transport, and induce degradation if they fail to fold. This phenomenon, called quality control, occurs at several levels and involves different types of folding sensors. The quality control system provides a stringent and versatile molecular sorting system that guaranties fidelity of protein expression in the secretory pathway. PMID:11260794

  9. HPLC for quality control of polyimides

    NASA Technical Reports Server (NTRS)

    Young, P. R.; Sykes, G. F.

    1979-01-01

    High Pressure Liquid Chromatography (HPLC) as a quality control tool for polyimide resins and prepregs are presented. A data base to help establish accept/reject criteria for these materials was developed. This work is intended to supplement, not replace, standard quality control tests normally conducted on incoming resins and prepregs. To help achieve these objectives, the HPLC separation of LARC-160 polyimide precursor resin was characterized. Room temperature resin aging effects were studied. Graphite reinforced composites made from fresh and aged resin were fabricated and tested to determine if changes observed by HPLC were significant.

  10. An implementable digital adaptive flight controller designed using stabilized single stage algorithms

    NASA Technical Reports Server (NTRS)

    Kaufman, H.; Alag, G.

    1975-01-01

    Simple mechanical linkages have not solved the many control problems associated with high performance aircraft maneuvering throughout a wide flight envelope. One procedure for retaining uniform handling qualities over such an envelope is to implement a digital adaptive controller. Towards such an implementation an explicit adaptive controller which makes direct use of on-line parameter identification, has been developed and applied to both linearized and nonlinear equations of motion for a typical fighter aircraft. This controller is composed of an on-line weighted least squares parameter identifier, a Kalman state filter, and a model following control law designed using single stage performance indices. Simulation experiments with realistic measurement noise indicate that the proposed adaptive system has the potential for on-board implementation.

  11. Soil moisture and strength index for earthwork construction quality control

    NASA Astrophysics Data System (ADS)

    Sawangsuriya, A.; Wachiraporn, S.; Sramoon, W.

    2015-09-01

    This paper presents the implementation of soil moisture and strength index measurements for earthwork construction quality control as well as a link between the in situ testing and structural property of earthen materials. Use of the convenient Dynamic Cone Penetrometer (DCP) in conjunction with conventional moisture-density measurements enhances quality control by achieving acceptable level of compaction, more uniform structural properties, and aids developing a controlled design parameter during the earthwork construction. Soil strength in term of DCP index normalized by the deviation of compaction moisture content from the optimum moisture content is proposed as performance criteria for a variety of engineered earth fills and special engineering assessment, prevention, and mitigation of geohazards e.g. earthen flood defense embankments.

  12. 76 FR 20846 - Approval and Promulgation of Air Quality Implementation Plans; Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-14

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana AGENCY... 2 emission limits in 326 IAC 7- 4.1-5 should result in improved air quality. There will no longer be... State Implementation Plan (SIP) under the Clean Air Act (CAA). These revisions address sulfur...

  13. 77 FR 37328 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Central Indiana...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Central... its Central Indiana 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) by...'s Motor Vehicle Emissions Simulator (MOVES) emissions model. The Central Indiana 1997 8-hour...

  14. 78 FR 63436 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Dayton-Springfield...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ...-2013-0378; FRL-9901-62-Region5] Approval and Promulgation of Air Quality Implementation Plans; Ohio... to revise the 1997 8-hour ozone maintenance air quality state implementation plan (SIP) for the... (MOVES) emissions model. The Dayton-Springfield area consists of Clark, Greene, Miami, and...

  15. 76 FR 54384 - California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-01

    ... AGENCY 40 CFR Part 52 California State Implementation Plan, South Coast Air Quality Management District... to the California State Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District (SCAQMD) Rule 1143, Consumer Paint Thinner & Multi-Purpose Solvents and Rule 1144,...

  16. 76 FR 32321 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Revision to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-06

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Revision to the Inspection and Maintenance (I/M) Program--Quality Assurance Protocol for the Safety... Implementation Plan (SIP). The revision consists of a change by the Commonwealth of Pennsylvania to the...

  17. Rotorcraft flying qualities improvement using advanced control

    NASA Technical Reports Server (NTRS)

    Walker, D.; Postlethwaite, I.; Howitt, J.; Foster, N.

    1993-01-01

    We report on recent experience gained when a multivariable helicopter flight control law was tested on the Large Motion Simulator (LMS) at DRA Bedford. This was part of a study into the application of multivariable control theory to the design of full-authority flight control systems for high-performance helicopters. In this paper, we present some of the results that were obtained during the piloted simulation trial and from subsequent off-line simulation and analysis. The performance provided by the control law led to level 1 handling quality ratings for almost all of the mission task elements assessed, both during the real-time and off-line analysis.

  18. Feedback Implementation of Zermelo's Optimal Control by Sugeno Approximation

    NASA Technical Reports Server (NTRS)

    Clifton, C.; Homaifax, A.; Bikdash, M.

    1997-01-01

    This paper proposes an approach to implement optimal control laws of nonlinear systems in real time. Our methodology does not require solving two-point boundary value problems online and may not require it off-line either. The optimal control law is learned using the original Sugeno controller (OSC) from a family of optimal trajectories. We compare the trajectories generated by the OSC and the trajectories yielded by the optimal feedback control law when applied to Zermelo's ship steering problem.

  19. Coaching to Enhance Quality of Implementation in Prevention

    ERIC Educational Resources Information Center

    Dusenbury, Linda; Hansen, William B.; Jackson-Newsom, Julia; Pittman, Donna S.; Wilson, Cicely V.; Nelson-Simley, Kathleen; Ringwalt, Chris; Pankratz, Melinda; Giles, Steven M.

    2010-01-01

    Purpose: The purpose of this paper is to describe the topics covered by coaches assisting teachers implementing a research-based drug prevention program and explore how coaching affects student outcomes. Design/methodology/approach: The All Stars drug prevention curriculum is implemented by 16 urban teachers who received four coaching sessions.…

  20. QUALITY SYSTEMS AND IMPLEMENTATION PLAN FOR A PILOT STUDY OF CHILDREN'S TOTAL EXPOSURE TO PERSISTENT PESTICIDES AND OTHER PERSISTENT ORGANIC PESTICIDES (CTEPP)

    EPA Science Inventory

    The Quality System Implementation Plan (QSIP) describes the quality assurance and quality control procedures developed for the CTEPP study. It provides the QA/QC procedures used in recruitment of subjects, sample field collection, sample extraction and analysis, data storage, and...

  1. [Experimental quality control of biopsy cannulas].

    PubMed

    Schild, H H; Michel, S G

    1993-09-01

    To examine the quality and comparability of biopsy needles. 310 biopsy needles of 40 types were examined microscopically and their suitability for penetrating tissues were studied. For this purpose the pressure required to penetrate a phantom was evaluated. The results were correlated with the diameter, design and construction. 50 of the 310 needles (16%) showed faults on microscopic examination. Measurements of identical needle types within a single production run showed variations in penetration pressures up to 330% (measured as force required for penetration), the average variation was 88%. The results show that the quality of biopsy needles is not constant and leaves something to be desired. To what extent variations in quality affect the biopsy material cannot be estimated. Nevertheless, the present results indicate that stricter quality control of biopsy needles is desirable.

  2. Implementation contexts of a Tuberculosis Control Program in Brazilian prisons.

    PubMed

    de Oliveira, Luisa Gonçalves Dutra; Natal, Sonia; Camacho, Luiz Antonio Bastos

    2015-01-01

    OBJECTIVE To analyze the influence from context characteristics in the control of tuberculosis in prisons, and the influence from the program implementation degrees in observed effects.METHODS A multiple case study, with a qualitative approach, conducted in the prison systems of two Brazilian states in 2011 and 2012. Two prisons were analyzed in each state, and a prison hospital was analyzed in one of them. The data were submitted to a content analysis, which was based on external, political-organizational, implementation, and effect dimensions. Contextual factors and the ones in the program organization were correlated. The independent variable was the program implementation degree and the dependent one, the effects from the Tuberculosis Control Program in prisons.RESULTS The context with the highest sociodemographic vulnerability, the highest incidence rate of tuberculosis, and the smallest amount of available resources were associated with the low implementation degree of the program. The results from tuberculosis treatment in the prison system were better where the program had already been partially implemented than in the case with low implementation degree in both cases.CONCLUSIONS The implementation degree and its contexts - external and political-organizational dimensions - simultaneously contribute to the effects that are observed in the control of tuberculosis in analyzed prisons.

  3. Implementation contexts of a Tuberculosis Control Program in Brazilian prisons

    PubMed Central

    de Oliveira, Luisa Gonçalves Dutra; Natal, Sonia; Camacho, Luiz Antonio Bastos

    2015-01-01

    OBJECTIVE To analyze the influence from context characteristics in the control of tuberculosis in prisons, and the influence from the program implementation degrees in observed effects. METHODS A multiple case study, with a qualitative approach, conducted in the prison systems of two Brazilian states in 2011 and 2012. Two prisons were analyzed in each state, and a prison hospital was analyzed in one of them. The data were submitted to a content analysis, which was based on external, political-organizational, implementation, and effect dimensions. Contextual factors and the ones in the program organization were correlated. The independent variable was the program implementation degree and the dependent one, the effects from the Tuberculosis Control Program in prisons. RESULTS The context with the highest sociodemographic vulnerability, the highest incidence rate of tuberculosis, and the smallest amount of available resources were associated with the low implementation degree of the program. The results from tuberculosis treatment in the prison system were better where the program had already been partially implemented than in the case with low implementation degree in both cases. CONCLUSIONS The implementation degree and its contexts – external and political-organizational dimensions – simultaneously contribute to the effects that are observed in the control of tuberculosis in analyzed prisons. PMID:26465668

  4. Water quality improvement policies: lessons learned from the implementation of Proposition O in Los Angeles, California.

    PubMed

    Park, Mi-Hyun; Stenstrom, Michael; Pincetl, Stephanie

    2009-03-01

    This article evaluates the implementation of Proposition O, a stormwater cleanup measure, in Los Angeles, California. The measure was intended to create new funding to help the city comply with the Total Maximum Daily Load requirements under the federal Clean Water Act. Funding water quality objectives through a bond measure was necessary because the city had insufficient revenues to deploy new projects in its budget. The bond initiative required a supermajority vote (two-thirds of the voters), hence the public had to be convinced that such funding both was necessary and would be effective. The bond act language included project solicitation from the public, as well as multiple benefit objectives. Accordingly, nonprofit organizations mobilized to present projects that included creating new parks, using schoolyards for flood control and groundwater recharge, and replacing parking lots with permeable surfaces, among others. Yet few, if any, of these projects were retained for funding, as the city itself also had a list of priorities and higher technical expertise in justifying them as delivering water quality improvements. Our case study of the implementation of Proposition O points to the potentially different priorities for the renovation of urban infrastructure that are held by nonprofit organizations and city agencies and the importance of structuring public processes clearly so that there are no misimpressions about funding and implementation responsibilities that can lead to disillusionment with government, especially under conditions of fiscal constraints.

  5. [Quality control of Maca (Lepidium meyenii)].

    PubMed

    Shu, Ji-cheng; Cui, Hang-qing; Huang, Ying-zheng; Huang, Xiao-ying; Yang, Ming

    2015-12-01

    To control the quality of Maca, the quality standard was established in this study. According to the methods recorded in the Appendix of Chinese Pharmacopoeia (2010 Edition), the water, extract, total ash, acid insoluble substance, and heavy metals inspections in Lepidium meyenii were carried out. N-benzyl-9Z, 12Z-octadecadienamide in L. meyenii was identified by TLC, and it was determined by HPLC. The results showed that the N-benzyl-9Z, 12Z-octadecadienamide identification of TLC was a strong mark and specificity. In content determination experiment, the linearity of N-benzyl-9Z, 12Z-octadecadienamide was in the range of 0.01-2 microg (r = 0.9998), and the average recovery (n=9) was 99.27% (RSD 2.0%). The methods were simple, accurate, with good reproducibility. It is suitable for quality control L. meyenii.

  6. Quality control and quality assurance plan for bridge channel-stability assessments in Massachusetts

    USGS Publications Warehouse

    Parker, Gene W.; Pinson, Harlow

    1993-01-01

    A quality control and quality assurance plan has been implemented as part of the Massachusetts bridge scour and channel-stability assessment program. This program is being conducted by the U.S. Geological Survey, Massachusetts-Rhode Island District, in cooperation with the Massachusetts Highway Department. Project personnel training, data-integrity verification, and new data-management technologies are being utilized in the channel-stability assessment process to improve current data-collection and management techniques. An automated data-collection procedure has been implemented to standardize channel-stability assessments on a regular basis within the State. An object-oriented data structure and new image management tools are used to produce a data base enabling management of multiple data object classes. Data will be reviewed by assessors and data base managers before being merged into a master bridge-scour data base, which includes automated data-verification routines.

  7. Outsourcing University Degrees: Implications for Quality Control

    ERIC Educational Resources Information Center

    Edwards, Julie; Crosling, Glenda; Edwards, Ron

    2010-01-01

    Education institutions worldwide have and continue to seek opportunities to spread their offerings abroad. While the provision of courses to students located overseas through partner institutions has many advantages, it raises questions about quality control that are not as applicable to other forms of international education. This paper uses a…

  8. F100 Multivariable Control Synthesis Program. Computer Implementation of the F100 Multivariable Control Algorithm

    NASA Technical Reports Server (NTRS)

    Soeder, J. F.

    1983-01-01

    As turbofan engines become more complex, the development of controls necessitate the use of multivariable control techniques. A control developed for the F100-PW-100(3) turbofan engine by using linear quadratic regulator theory and other modern multivariable control synthesis techniques is described. The assembly language implementation of this control on an SEL 810B minicomputer is described. This implementation was then evaluated by using a real-time hybrid simulation of the engine. The control software was modified to run with a real engine. These modifications, in the form of sensor and actuator failure checks and control executive sequencing, are discussed. Finally recommendations for control software implementations are presented.

  9. A Guide for Ensuring Quality Implementation of Evidence-Based Practices in Schools

    ERIC Educational Resources Information Center

    Markle, Robert S.; Lamont, Andrea E.

    2013-01-01

    This article discusses some key components of implementing innovations in schools and presents a guide for quality implementation of school programs. While it is more of a broad overview than a detailed toolkit, this information will help introduce more systemic thinking into schools and improve implementation so as to increase the chance of…

  10. Implementing Controlled Composition to Improve Vocabulary Mastery of EFL Students

    ERIC Educational Resources Information Center

    Juriah

    2015-01-01

    The purposes of this study was to know how (1) Controlled composition teaching techniques implemented by the English teacher at SDN 027 Samarinda to improve vocabulary mastery, and (2) Controlled composition teaching techniques improves vocabulary mastery of the sixth grade students of SDN 027 Samarinda. This research used a Classroom Action…

  11. 14 CFR 417.407 - Hazard control implementation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Hazard control implementation. 417.407 Section 417.407 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH SAFETY Ground Safety § 417.407 Hazard control...

  12. 14 CFR 417.407 - Hazard control implementation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Hazard control implementation. 417.407 Section 417.407 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH SAFETY Ground Safety § 417.407 Hazard control...

  13. 14 CFR 417.407 - Hazard control implementation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Hazard control implementation. 417.407 Section 417.407 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH SAFETY Ground Safety § 417.407 Hazard control...

  14. 14 CFR 417.407 - Hazard control implementation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Hazard control implementation. 417.407 Section 417.407 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH SAFETY Ground Safety § 417.407 Hazard control...

  15. Implementation of a nursing home quality improvement project to reduce resident pain: a qualitative case study.

    PubMed

    Abrahamson, Kathleen; DeCrane, Susan; Mueller, Christine; Davila, Heather Wood; Arling, Greg

    2015-01-01

    This article describes the experiences of staff members working within nursing homes that successfully implemented a quality improvement project aimed at reducing resident pain. Interviews were conducted with 24 nursing home employees from within 8 facilities participating in the quality improvement project. Findings were organized using the Consolidated Framework for Implementation Research. Interdisciplinary communication, supportive leadership, training, and nursing assistant participation facilitated implementation. Increased documentation, resistance to change, and difficulty measuring outcomes were perceived challenges.

  16. Integration of Quality Assurance/Quality Control into Quantitative Analysis

    NASA Astrophysics Data System (ADS)

    Bell, Suzanne C.; Moore, Jeff

    1998-07-01

    Modern laboratories, be they in government or industry, operate under strict quality assurance and quality control (QA/QC) guidelines. Yet, these topics are rarely covered in undergraduate laboratories, or are presented as isolated experiments. This fosters the false idea that QA/QC is a separate subject when in actuality it is an integral part of analytical chemistry. It is possible to incorporate QA/QC into existing student laboratories by utilizing blanks, replicates, knowns and spiked samples. Proper use of QA/QC, coupled to an understanding of fundamental chemical principles and statistics strengthens traditional laboratory exercises. Concepts of accuracy and precision are transformed from abstractions into concrete data, and student skills in troubleshooting and problem solving are enhanced.

  17. Statistical quality control through overall vibration analysis

    NASA Astrophysics Data System (ADS)

    Carnero, M. a. Carmen; González-Palma, Rafael; Almorza, David; Mayorga, Pedro; López-Escobar, Carlos

    2010-05-01

    The present study introduces the concept of statistical quality control in automotive wheel bearings manufacturing processes. Defects on products under analysis can have a direct influence on passengers' safety and comfort. At present, the use of vibration analysis on machine tools for quality control purposes is not very extensive in manufacturing facilities. Noise and vibration are common quality problems in bearings. These failure modes likely occur under certain operating conditions and do not require high vibration amplitudes but relate to certain vibration frequencies. The vibration frequencies are affected by the type of surface problems (chattering) of ball races that are generated through grinding processes. The purpose of this paper is to identify grinding process variables that affect the quality of bearings by using statistical principles in the field of machine tools. In addition, an evaluation of the quality results of the finished parts under different combinations of process variables is assessed. This paper intends to establish the foundations to predict the quality of the products through the analysis of self-induced vibrations during the contact between the grinding wheel and the parts. To achieve this goal, the overall self-induced vibration readings under different combinations of process variables are analysed using statistical tools. The analysis of data and design of experiments follows a classical approach, considering all potential interactions between variables. The analysis of data is conducted through analysis of variance (ANOVA) for data sets that meet normality and homoscedasticity criteria. This paper utilizes different statistical tools to support the conclusions such as chi squared, Shapiro-Wilks, symmetry, Kurtosis, Cochran, Hartlett, and Hartley and Krushal-Wallis. The analysis presented is the starting point to extend the use of predictive techniques (vibration analysis) for quality control. This paper demonstrates the existence

  18. Implementing Total Quality Management: A Model for Research Libraries.

    ERIC Educational Resources Information Center

    Barnard, Susan B.

    1993-01-01

    Describes a model of Total Quality Management (TQM) developed by the Association of Research Libraries. The issues, elements and processes of a comprehensive TQM-based transition, including commitment by management, linkage to organizational strategic planning, organizational culture, understanding customers, and quality teams are covered.…

  19. Avoiding surprises when implementing a single quality system.

    PubMed

    Donawa, Maria

    2009-01-01

    European medical device manufacturers are sometimes surprised to learn that operating ISO 13485 alone is not sufficient to meet United States (US) quality system requirements. This article discusses important considerations for meeting US and European requirements when operating under a single quality system.

  20. Listening to the Customer: Implementing Quality Function Deployment.

    ERIC Educational Resources Information Center

    Schauerman, Sam; And Others

    1994-01-01

    Describes Yoji Akao's concept of quality function development (QFD), a strategic tool that translates the customers' quality requirements into organizational language. Examines how El Camino College's (California) application of QFD matches constituent needs to college functions. Includes an 11-item bibliography and lists El Camino College's…

  1. Managing for Organizational Quality-Theory and Implementation: An Annotated Bibliography

    DTIC Science & Technology

    1990-06-01

    IX-2 Delatore , J. P., Prell, E. M., & Vora, M. K. (January 1989). Translating customer needs into product specifications. Quality Progress, 2,2(1...agencies to implement quality improvement programs. Delatore , J. P., Prell, E. M., & Vora, M. K. (January 1989). Translating customer needs into product...Hermann & Baker in TEAMWORK Backaitis in SUPPLIERS Ohio Quality and Productivity Forum in SUPPLIERS Baker (1987) in IMPLEMENTATION/CASES Delatore et al. in

  2. Total Quality Management Guide. Volume 2. A Guide to Implementation

    DTIC Science & Technology

    1990-02-15

    in tiffl Cttn anid stod FIG. S-3. WORKFLOW DIAGIIAM B - Appendix B: Seven Basic Graphic Tools PARETO CHARTS In the late 1800s, Vilfredo Pareto , an...Opportunities. NOU Graph Pareto Chart 2. Prioritize & Select Improvement Opportunities Fishbane Diagram Pareto Chart 3. Analyze Root Causes Solution...Selectlor, Matrix Barriers and Aids 4. Select Solution Trial Impltementation Pareto , Chart Graph 5. Conduct Trial- Implementation Implementation

  3. Chemical Characterization and Quality Control for an Adhesive.

    DTIC Science & Technology

    ADHESIVES, *IDENTIFICATION, *CHEMICAL ANALYSIS, *QUALITY CONTROL, PHYSICOCHEMICAL PROPERTIES, ACCEPTANCE TESTS, CLASSIFICATION, VIABILITY, TEST METHODS, ANALYTICAL CHEMISTRY, PROCESSING, PRODUCTION CONTROL , AIRCRAFT .

  4. The implementation of STOVL task-tailored control modes in a fighter cockpit

    NASA Technical Reports Server (NTRS)

    Whatley, David W.; Virnig, John C.; Bodden, David S.

    1990-01-01

    The implementation of Short Takeoff/Vertical Landing (STOVL) specific task tailored control modes in a supersonic fighter/attack aircraft cockpit is investigated. A detailed linear model exhibiting STOVL Level 1 handling qualities is implemented in a real time engineering workstation environment with an F-16 cockpit mock-up. Conventional F-16 control inceptors are utilized to achieve effective STOVL operation and reduced pilot workload throughout the transition to hover flight region. Favorable pilot comments indicate the existing F-16 cockpit configuration with a force sidestick is adaptable to STOVL operation.

  5. A multiple objective optimization approach to quality control

    NASA Technical Reports Server (NTRS)

    Seaman, Christopher Michael

    1991-01-01

    The use of product quality as the performance criteria for manufacturing system control is explored. The goal in manufacturing, for economic reasons, is to optimize product quality. The problem is that since quality is a rather nebulous product characteristic, there is seldom an analytic function that can be used as a measure. Therefore standard control approaches, such as optimal control, cannot readily be applied. A second problem with optimizing product quality is that it is typically measured along many dimensions: there are many apsects of quality which must be optimized simultaneously. Very often these different aspects are incommensurate and competing. The concept of optimality must now include accepting tradeoffs among the different quality characteristics. These problems are addressed using multiple objective optimization. It is shown that the quality control problem can be defined as a multiple objective optimization problem. A controller structure is defined using this as the basis. Then, an algorithm is presented which can be used by an operator to interactively find the best operating point. Essentially, the algorithm uses process data to provide the operator with two pieces of information: (1) if it is possible to simultaneously improve all quality criteria, then determine what changes to the process input or controller parameters should be made to do this; and (2) if it is not possible to improve all criteria, and the current operating point is not a desirable one, select a criteria in which a tradeoff should be made, and make input changes to improve all other criteria. The process is not operating at an optimal point in any sense if no tradeoff has to be made to move to a new operating point. This algorithm ensures that operating points are optimal in some sense and provides the operator with information about tradeoffs when seeking the best operating point. The multiobjective algorithm was implemented in two different injection molding scenarios

  6. Partial reconfiguration of concurrent logic controllers implemented in FPGA devices

    NASA Astrophysics Data System (ADS)

    Wiśniewski, Remigiusz; Grobelna, Iwona; Stefanowicz, Łukasz

    2016-12-01

    Reconfigurable systems are recently used in many domains. Although the concept of multi-context logic controllers is relatively new, it may be noticed that the subject is receiving a lot of attention, especially in the industry. The work constitutes a stepping stone in design of reconfigurable logic controllers implemented in an FPGA device. An approach of designing of logic controllers oriented for further partial reconfiguration is proposed. A case study of a milling machine is used for an illustration.

  7. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory...

  8. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed...

  9. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory...

  10. 21 CFR 211.22 - Responsibilities of quality control unit.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 4 2011-04-01 2011-04-01 false Responsibilities of quality control unit. 211.22... Personnel § 211.22 Responsibilities of quality control unit. (a) There shall be a quality control unit that... have been fully investigated. The quality control unit shall be responsible for approving or...

  11. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory...

  12. 21 CFR 211.22 - Responsibilities of quality control unit.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 4 2013-04-01 2013-04-01 false Responsibilities of quality control unit. 211.22... Personnel § 211.22 Responsibilities of quality control unit. (a) There shall be a quality control unit that... have been fully investigated. The quality control unit shall be responsible for approving or...

  13. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed...

  14. 21 CFR 211.22 - Responsibilities of quality control unit.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 4 2014-04-01 2014-04-01 false Responsibilities of quality control unit. 211.22... Personnel § 211.22 Responsibilities of quality control unit. (a) There shall be a quality control unit that... have been fully investigated. The quality control unit shall be responsible for approving or...

  15. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory...

  16. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for...

  17. 21 CFR 211.22 - Responsibilities of quality control unit.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Responsibilities of quality control unit. 211.22... Personnel § 211.22 Responsibilities of quality control unit. (a) There shall be a quality control unit that... have been fully investigated. The quality control unit shall be responsible for approving or...

  18. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed...

  19. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for...

  20. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for...

  1. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed...

  2. 21 CFR 211.22 - Responsibilities of quality control unit.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 4 2012-04-01 2012-04-01 false Responsibilities of quality control unit. 211.22... Personnel § 211.22 Responsibilities of quality control unit. (a) There shall be a quality control unit that... have been fully investigated. The quality control unit shall be responsible for approving or...

  3. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for...

  4. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory...

  5. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for...

  6. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed...

  7. Quality and Control of Water Vapor Winds

    NASA Technical Reports Server (NTRS)

    Jedlovec, Gary J.; Atkinson, Robert J.

    1996-01-01

    Water vapor imagery from the geostationary satellites such as GOES, Meteosat, and GMS provides synoptic views of dynamical events on a continual basis. Because the imagery represents a non-linear combination of mid- and upper-tropospheric thermodynamic parameters (three-dimensional variations in temperature and humidity), video loops of these image products provide enlightening views of regional flow fields, the movement of tropical and extratropical storm systems, the transfer of moisture between hemispheres and from the tropics to the mid- latitudes, and the dominance of high pressure systems over particular regions of the Earth. Despite the obvious larger scale features, the water vapor imagery contains significant image variability down to the single 8 km GOES pixel. These features can be quantitatively identified and tracked from one time to the next using various image processing techniques. Merrill et al. (1991), Hayden and Schmidt (1992), and Laurent (1993) have documented the operational procedures and capabilities of NOAA and ESOC to produce cloud and water vapor winds. These techniques employ standard correlation and template matching approaches to wind tracking and use qualitative and quantitative procedures to eliminate bad wind vectors from the wind data set. Techniques have also been developed to improve the quality of the operational winds though robust editing procedures (Hayden and Veldon 1991). These quality and control approaches have limitations, are often subjective, and constrain wind variability to be consistent with model derived wind fields. This paper describes research focused on the refinement of objective quality and control parameters for water vapor wind vector data sets. New quality and control measures are developed and employed to provide a more robust wind data set for climate analysis, data assimilation studies, as well as operational weather forecasting. The parameters are applicable to cloud-tracked winds as well with minor

  8. 78 FR 23492 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Particulate Matter Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Particulate Matter Air Quality Standards AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule... Ambient Air Quality Standards (NAAQS) promulgated by EPA in 2006, and removes the annual coarse...

  9. 78 FR 28173 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Sulfur Dioxide and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-14

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Sulfur Dioxide and Nitrogen Dioxide Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA... national ambient air quality standards (NAAQS) for NO 2 and SO 2 to be consistent with the NAAQS that...

  10. 75 FR 11461 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Minnesota AGENCY..., the air quality of Ramsey County will be protected. DATES: This direct final rule will be effective... culpable source in the Childs Road area's nonattainment of the PM 10 National Ambient Air Quality...

  11. 78 FR 9650 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Amendments to Maryland's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; Amendments to Maryland's Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA). ACTION... ambient air quality standards (NAAQS). In the Final Rules section of this Federal Register, EPA...

  12. 78 FR 38648 - Approval and Promulgation of Air Quality Implementation Plans; State of New Jersey; Redesignation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-27

    ... AGENCY 40 CFR Parts 52 and 81 Approval and Promulgation of Air Quality Implementation Plans; State of New Jersey; Redesignation of Areas for Air Quality Planning Purposes and Approval of the Associated... Air Quality Standards (NAAQS). In conjunction with its redesignation request, New Jersey submitted...

  13. 77 FR 65493 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Amendments to West...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-29

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Amendments to West Virginia's Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA... Legislative Rule, 45 CSR 8- Ambient Air Quality Standards. The amendments change the effective date of...

  14. 78 FR 65593 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Infrastructure Requirements for the 2010 Nitrogen Dioxide National Ambient Air Quality Standards AGENCY... new or revised national ambient air quality standards (NAAQS) are promulgated, the CAA requires...

  15. 75 FR 78602 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-16

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Minnesota AGENCY... National Ambient Air Quality Standard (NAAQS). However, the area currently meets the NAAQS for PM 10 , and... the purposes of achieving or maintaining attainment with the national ambient air quality standard...

  16. 78 FR 28143 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Sulfur Dioxide and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-14

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Sulfur Dioxide and Nitrogen Dioxide Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA... amend the national ambient air quality standards (NAAQS) for NO 2 and SO 2 to be consistent with...

  17. 77 FR 56125 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Amendments to West...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-12

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Amendments to West Virginia's Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA... West Virginia's Legislative Rule regarding ambient air quality standards (45 CSR 8-- Ambient...

  18. 75 FR 81477 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Amendments to Ambient...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Virginia; Amendments to Ambient Air Quality Standards for Particulate Matter AGENCY: Environmental Protection Agency (EPA... quality standards for particulate matter (PM). This action is being taken under the Clean Air Act...

  19. 78 FR 49409 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-14

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure Requirements for the 2010 Nitrogen Dioxide National Ambient Air Quality Standards AGENCY... or revised national ambient air quality standards (NAAQS) are promulgated, the CAA requires states...

  20. 75 FR 19886 - Approval and Promulgation of Air Quality Implementation Plans; Wyoming; Revisions to the Wyoming...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Wyoming; Revisions to the Wyoming Air Quality Standards and Regulations AGENCY: Environmental Protection Agency (EPA... the State of Wyoming on September 11, 2008. Wyoming has revised its Air Quality Standards...

  1. 75 FR 76332 - Approval and Promulgation of Air Quality Implementation Plans; Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-08

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Illinois AGENCY...) for purposes of attaining the 1997 8-hour ozone National Ambient Air Quality Standard (NAAQS). The... emissions depend on the ozone nonattainment classification of an area. The air quality planning and...

  2. 78 FR 9593 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Amendments to Maryland's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; Amendments to Maryland's Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA). ACTION... reference of the national ambient air quality standards (NAAQS) by the State of Maryland. EPA is...

  3. 78 FR 42482 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-16

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards AGENCY: Environmental...). Whenever new or revised national ambient air quality standards (NAAQS) are promulgated, the CAA...

  4. 77 FR 65520 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Amendments to West...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-29

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Amendments to West Virginia's Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA... CSR 8--Ambient Air Quality Standards. In the Final Rules section of this Federal Register, EPA...

  5. 78 FR 53709 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-30

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure Requirements for the 2008 Ozone National Ambient Air Quality Standards AGENCY: Environmental... revised national ambient air quality standards (NAAQS) are promulgated, the CAA requires states to...

  6. 75 FR 48864 - Approval and Promulgation of Air Quality Implementation Plans; MN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; MN AGENCY... Rochester area's nonattainment plan for the SO 2 National Ambient Air Quality Standard (NAAQS). However, the... achieving or maintaining attainment with the national ambient air quality standard and which was part of...

  7. 78 FR 63933 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revised Ambient Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revised Ambient Air Quality Standards for Fine Particulate Matter AGENCY: Environmental Protection Agency (EPA... submitted by the Commonwealth of Virginia adding ambient air quality standards and associated...

  8. 76 FR 77739 - Approval and Promulgation of Air Quality Implementation Plans; Massachusetts and New Hampshire...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-14

    ... comments to: Anne Arnold, Manager, Air Quality Planning Unit, Office of Ecosystem Protection, U.S... INFORMATION CONTACT: Richard P. Burkhart, Air Quality Planning Unit, U.S. Environmental Protection Agency, EPA... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Massachusetts...

  9. 77 FR 28264 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Ohio; Determination...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-14

    ...-Weirton Area. The resident perceives the air quality to be poor and thus questioned how this Area will be... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Ohio... (PM 2.5 ) National Ambient Air Quality Standard (NAAQS). EPA is determining that the...

  10. Implementing Quality Management in the University: The Role of Leadership in Finnish Universities

    ERIC Educational Resources Information Center

    Anyamele, Stephen Chukwu

    2005-01-01

    This paper investigates how university leaders in Finland implement quality management in their respective institutions. The study uses a modified model of the European Foundation for Quality Management (EFQM) Excellence Model as a theoretical base in eliciting information on quality management strategies from the senior academic leaders in these…

  11. 77 FR 2469 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... to the Antelope Valley Air Quality Management District (AVAQMD) and Imperial County Air Pollution.... * * * * * (G) Antelope Valley Air Quality Management District. (1) Rule 1134, ``Stationary Gas...

  12. 78 FR 14020 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; the 2002 Base Year...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-04

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Delaware; the 2002... 1997 Annual Fine Particulate Matter National Ambient Air Quality Standard AGENCY: Environmental... particulate matter (PM 2.5 ) national ambient air quality standard (NAAQS). EPA is approving the 2002...

  13. 77 FR 18922 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Determinations of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... the 2008-2010 data in EPA's Air Quality System (AQS) database. EPA's determinations relieve these... based on 2008 to 2010 ambient air quality data, the Harrisburg-Lebanon-Carlisle-York, Allentown...-0818; FRL-9654-1] Approval and Promulgation of Air Quality Implementation Plans;...

  14. 78 FR 66320 - Approval and Promulgation of Air Quality Implementation Plans; Ohio: Bellefontaine; Determination...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-05

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio: Bellefontaine... attained the 2008 lead (Pb) national ambient air quality standard (NAAQS). In this action, EPA is proposing... determination of attainment is based upon complete, quality-assured and certified ambient air monitoring...

  15. 77 FR 65478 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Indiana; Michigan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-29

    ... requirements are designed to ensure that the structural components of each State's air quality management... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Illinois; Indiana... Air Quality Standards; Indiana NSR/PSD AGENCY: Environmental Protection Agency (EPA). ACTION:...

  16. 78 FR 44487 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Redesignation of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... quality design value for the Area is 13.0 micrograms per cubic meter ( g/m\\3\\) (based on 2009-2011 air... AGENCY 40 CFR Parts 52 and 81 Approval and Promulgation of Air Quality Implementation Plans; West...) to attainment for the 1997 annual PM 2.5 national ambient air quality standard (NAAQS)....

  17. 75 FR 75656 - Approval and Promulgation of Air Quality Implementation Plans; New Hampshire; Determination of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-06

    ... is based upon complete, quality-assured and certified ambient air monitoring data that show the area... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; New Hampshire... Air Quality Standard (NAAQS) for ozone. This determination is based upon complete,...

  18. 77 FR 71371 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Redesignation of the Ohio...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-30

    ... AGENCY 40 CFR Parts 52 and 81 Approval and Promulgation of Air Quality Implementation Plans; Ohio... annual PM 2.5 standard, based on the most recent three years of certified air quality data. EPA is... maintaining the 1997 annual PM 2.5 National Ambient Air Quality Standard (NAAQS) through 2022 in the...

  19. 76 FR 758 - Disapproval and Promulgation of Air Quality Implementation Plans; Montana; Revisions to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-06

    ... other materials into air quality rules. EPA is not acting on these rule submissions. These revisions... AGENCY 40 CFR Part 52 Disapproval and Promulgation of Air Quality Implementation Plans; Montana; Revisions to the Administrative Rules of Montana--Air Quality, Subchapter 7, Subchapter 16 and Subchapter...

  20. 40 CFR 75.21 - Quality assurance and quality control requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Quality assurance and quality control... assurance and quality control requirements. (a) Continuous emission monitoring systems. The owner or... system according to the quality assurance and quality control procedures in appendix B of this part....

  1. 40 CFR 75.21 - Quality assurance and quality control requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 17 2014-07-01 2014-07-01 false Quality assurance and quality control... assurance and quality control requirements. (a) Continuous emission monitoring systems. The owner or... system according to the quality assurance and quality control procedures in appendix B of this part....

  2. 40 CFR 75.21 - Quality assurance and quality control requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Quality assurance and quality control... assurance and quality control requirements. (a) Continuous emission monitoring systems. The owner or... system according to the quality assurance and quality control procedures in appendix B of this part....

  3. 40 CFR 75.21 - Quality assurance and quality control requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 16 2011-07-01 2011-07-01 false Quality assurance and quality control... assurance and quality control requirements. (a) Continuous emission monitoring systems. The owner or... system according to the quality assurance and quality control procedures in appendix B of this part....

  4. 75 FR 45568 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... assured, quality controlled, and certified ambient air monitoring data for the years 2007-2009 showing... determination is based upon complete, quality assured, quality controlled, and certified ambient air monitoring...-hour ozone NAAQS. Preliminary air quality monitoring data available for 2010 are consistent...

  5. Quality control and data flow operations of SPHERE

    NASA Astrophysics Data System (ADS)

    Hummel, Wolfgang; Girard, Julien H. V.; Milli, Julien; Wahhaj, Zahed; Lundin, Lars; Vigan, Arthur

    2016-07-01

    ESO operates since April 2015 the new planet finder instrument SPHERE1 with three arms supported by a common path coronograph with extreme AO. Observing modes include dual band imaging, long slit spectroscopy, IFS and high contrast polarimetry. We report on the implementation of the SPHERE data flow and quality control system and on operational highlights in the first year of operations: This includes some unconventional parts of the SPHERE calibration plan like special rules for the selection of filters and the measures for an optimized calibration of the two polarimetric channels of the ZIMPOL arm. Finally we report on the significance of the SPHERE quality control system, its relation to the data reduction pipeline and which previously undocumented instrumental features have been revealed so far.

  6. 78 FR 44485 - Implementation of the 2008 National Ambient Air Quality Standards for Ozone: State Implementation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... for Ozone: State Implementation Plan Requirements AGENCY: Environmental Protection Agency (EPA... Standards for Ozone: State Implementation Plan Requirements'' (June 6, 2013). The EPA is extending the...) and nitrogen oxides (NO X )) that contribute to ground-level ozone formation. B. What should...

  7. Implementation of motor speed control using PID control in programmable logic controller

    NASA Astrophysics Data System (ADS)

    Samin, R. E.; Azmi, N. A.; Ahmad, M. A.; Ghazali, M. R.; Zawawi, M. A.

    2012-11-01

    This paper presents the implementation of motor speed control using Proportional Integral Derrivative (PID) controller using Programmable Logic Controller (PLC). Proportional Integral Derrivative (PID) controller is the technique used to actively control the speed of the motor. An AC motor is used in the research together with the PLC, encoder and Proface touch screen. The model of the PLC that has been used in this project is OMRON CJIG-CPU42P where this PLC has a build in loop control that can be made the ladder diagram quite simple using function block in CX-process tools. A complete experimental analysis of the technique in terms of system response is presented. Comparative assessment of the impact of Proportional, Integral and Derivative in the controller on the system performance is presented and discussed.

  8. A Method for Implementing Force-Limited Vibration Control

    NASA Technical Reports Server (NTRS)

    Worth, Daniel B.

    1997-01-01

    NASA/GSFC has implemented force-limited vibration control on a controller which can only accept one profile. The method uses a personal computer based digital signal processing board to convert force and/or moment signals into what appears to he an acceleration signal to the controller. This technique allows test centers with older controllers to use the latest force-limited control techniques for random vibration testing. The paper describes the method, hardware, and test procedures used. An example from a test performed at NASA/GSFC is used as a guide.

  9. [Implementation of the technical requirements of the UNE-EN-ISO 15189 quality standard in a mycobacterial laboratory].

    PubMed

    Guna Serrano, M del Remedio; Ocete Mochón, M Dolores; Lahiguera, M José; Bresó, M Carmen; Gimeno Cardona, Concepción

    2013-02-01

    The UNE-EN-ISO 15189:2007 standard defines the requirements for quality and competence that must be met by medical laboratories. These laboratories should use this international standard to develop their own quality management systems and to evaluate their own competencies; in turn, this standard will be used by accreditation bodies to confirm or recognize the laboratories' competence. In clinical microbiology laboratories, application of the standard implies the implementation of the technical and specific management requirements that must be met to achieve optimal quality when carrying out microbiological tests. In Spain, accreditation is granted by the Spanish Accreditation Body (Entidad Nacional de Acreditación). This review aims to discuss the practical application of the standard's technical requirements in mycobacterial laboratory. Firstly, we define the scope of accreditation. Secondly, we specify how the items of the standard on personnel management, control of equipment, environmental facilities, method validation, internal controls and customer satisfaction surveys were developed and implemented in our laboratory.

  10. Process-based quality management for clinical implementation of adaptive radiotherapy

    SciTech Connect

    Noel, Camille E.; Santanam, Lakshmi; Parikh, Parag J.; Mutic, Sasa

    2014-08-15

    Purpose: Intensity-modulated adaptive radiotherapy (ART) has been the focus of considerable research and developmental work due to its potential therapeutic benefits. However, in light of its unique quality assurance (QA) challenges, no one has described a robust framework for its clinical implementation. In fact, recent position papers by ASTRO and AAPM have firmly endorsed pretreatment patient-specific IMRT QA, which limits the feasibility of online ART. The authors aim to address these obstacles by applying failure mode and effects analysis (FMEA) to identify high-priority errors and appropriate risk-mitigation strategies for clinical implementation of intensity-modulated ART. Methods: An experienced team of two clinical medical physicists, one clinical engineer, and one radiation oncologist was assembled to perform a standard FMEA for intensity-modulated ART. A set of 216 potential radiotherapy failures composed by the forthcoming AAPM task group 100 (TG-100) was used as the basis. Of the 216 failures, 127 were identified as most relevant to an ART scheme. Using the associated TG-100 FMEA values as a baseline, the team considered how the likeliness of occurrence (O), outcome severity (S), and likeliness of failure being undetected (D) would change for ART. New risk priority numbers (RPN) were calculated. Failures characterized by RPN ≥ 200 were identified as potentially critical. Results: FMEA revealed that ART RPN increased for 38% (n = 48/127) of potential failures, with 75% (n = 36/48) attributed to failures in the segmentation and treatment planning processes. Forty-three of 127 failures were identified as potentially critical. Risk-mitigation strategies include implementing a suite of quality control and decision support software, specialty QA software/hardware tools, and an increase in specially trained personnel. Conclusions: Results of the FMEA-based risk assessment demonstrate that intensity-modulated ART introduces different (but not necessarily

  11. Process-based quality management for clinical implementation of adaptive radiotherapy

    PubMed Central

    Noel, Camille E.; Santanam, Lakshmi; Parikh, Parag J.; Mutic, Sasa

    2014-01-01

    Purpose: Intensity-modulated adaptive radiotherapy (ART) has been the focus of considerable research and developmental work due to its potential therapeutic benefits. However, in light of its unique quality assurance (QA) challenges, no one has described a robust framework for its clinical implementation. In fact, recent position papers by ASTRO and AAPM have firmly endorsed pretreatment patient-specific IMRT QA, which limits the feasibility of online ART. The authors aim to address these obstacles by applying failure mode and effects analysis (FMEA) to identify high-priority errors and appropriate risk-mitigation strategies for clinical implementation of intensity-modulated ART. Methods: An experienced team of two clinical medical physicists, one clinical engineer, and one radiation oncologist was assembled to perform a standard FMEA for intensity-modulated ART. A set of 216 potential radiotherapy failures composed by the forthcoming AAPM task group 100 (TG-100) was used as the basis. Of the 216 failures, 127 were identified as most relevant to an ART scheme. Using the associated TG-100 FMEA values as a baseline, the team considered how the likeliness of occurrence (O), outcome severity (S), and likeliness of failure being undetected (D) would change for ART. New risk priority numbers (RPN) were calculated. Failures characterized by RPN ≥ 200 were identified as potentially critical. Results: FMEA revealed that ART RPN increased for 38% (n = 48/127) of potential failures, with 75% (n = 36/48) attributed to failures in the segmentation and treatment planning processes. Forty-three of 127 failures were identified as potentially critical. Risk-mitigation strategies include implementing a suite of quality control and decision support software, specialty QA software/hardware tools, and an increase in specially trained personnel. Conclusions: Results of the FMEA-based risk assessment demonstrate that intensity-modulated ART introduces different (but not necessarily

  12. Quality assurance and quality control for autonomously collected geoscience data

    NASA Astrophysics Data System (ADS)

    Versteeg, R. J.; Richardson, A.; Labrecque, D.

    2006-12-01

    The growing interest in processes, coupled with the reduction in cost and complexity of sensors which allow for continuous data collection and transmission is giving rise to vast amounts of semi autonomously collected data. Such data is typically collected from a range of physical and chemical sensors and transmitted - either at the time of collection, or periodically as a collection of measurements - to a central server. Such setups can collect vast amounts of data. In cases where power is not an issue one datapoint can be collected every minute, resulting in tens of thousands of data points per month per sensor. Especially in cases in which multiple sensors are deployed it is infeasible to examine each individual datapoint for each individual sensor, and users typically will look at aggregates of such data on a periodic (once a week to once every few months) basis. Such aggregates (and the timelag between data collection and data evaluation) will impact the ability to rapidly identify and resolve data issues. Thus, there is a need to integrate data qa/qc rules and procedures in the data collection process. These should be implemented such that data is analyzed for compliance the moment it arrives at the server, and that any issues with this data result in notification of cognizant personnel. Typical issues (encountered in the field) include complete system failure (resulting in no data arriving at all), to complete sensor failure (data is collected, but is meaningless), to partial sensor failure (sensor gives erratic readings, or starts to exhibit a bias) to partial powerloss (system collects and transmits data only intermittently). We have implemented a suite of such rules and tests as part of the INL developed performance monitoring system. These rules are invoked as part of a data qa/qc workflow, and result in quality indicators for each datapoint as well as user alerts in case of issues. Tests which are applied to the data include tests on individual

  13. Incorporating Quality Control Information in the Sensor Web

    NASA Astrophysics Data System (ADS)

    Devaraju, Anusuriya; Kunkel, Ralf; Bogena, Heye

    2013-04-01

    The rapid development of sensing technologies had led to the creation of large amounts of heterogeneous environmental observations. The Sensor Web provides a wider access to sensors and observations via common protocols and specifications. Observations typically go through several levels of quality control, and aggregation before they are made available to end-users. Raw data are usually inspected, and related quality flags are assigned. Data are gap-filled, and errors are removed. New data series may also be derived from one or more corrected data sets. Until now, it is unclear how these kinds of information can be captured in the Sensor Web Enablement (SWE) framework. Apart from the quality measures (e.g., accuracy, precision, tolerance, or confidence), the levels of observational series, the changes applied, and the methods involved must be specified. It is important that this kind of quality control information is well described and communicated to end-users to allow for a better usage and interpretation of data products. In this paper, we describe how quality control information can be incorporated into the SWE framework. Concerning this, first, we introduce the TERENO (TERrestrial ENvironmental Observatories), an initiative funded by the large research infrastructure program of the Helmholtz Association in Germany. The main goal of the initiative is to facilitate the study of long-term effects of climate and land use changes. The TERENO Online Data RepOsitORry (TEODOOR) is a software infrastructure that supports acquisition, provision, and management of observations within TERENO via SWE specifications and several other OGC web services. Next, we specify changes made to the existing observational data model to incorporate quality control information. Here, we describe the underlying TERENO data policy in terms of provision and maintenance issues. We present data levels, and their implementation within TEODOOR. The data levels are adapted from those used by

  14. Implementation intentions for buying, carrying, discussing and using condoms: the role of the quality of plans.

    PubMed

    de Vet, Emely; Gebhardt, Winifred Anne; Sinnige, Judith; Van Puffelen, Anne; Van Lettow, Britt; de Wit, John B F

    2011-06-01

    Forming implementation intentions (i.e. action plans that specify when, where and how a person will act) could be effective in promoting condom use on a large scale. However, the technique implies that people are able to form high quality implementation plans that are likely to induce behaviour change. Young single females, aged 16-30 years old, were asked to form either an implementation intention for the target behaviour using condoms (n = 159) or preparatory implementation intentions for buying, carrying, discussing and using condoms (n = 146). Condom preparations were assessed at follow-up 2 months later. The implementation intentions that participants formed were rated on quality. In general, it appeared hard for young women to form high quality general implementation intentions for the target behaviour condom use. Implementation intentions for the preparatory behaviours were of better quality than general implementation intentions. Females who formed strong implementation intentions in the preparatory behaviours condition were more committed to these plans and perceived them as more useful. Plan commitment and perceived usefulness predicted condom preparations at follow-up. We conclude that it is important to ask individuals to form implementation intentions for the preparatory behaviours rather than for the target behaviour alone.

  15. Technology's Achilles Heel: Achieving High-Quality Implementation

    ERIC Educational Resources Information Center

    Hall, Gene E.

    2010-01-01

    An inherent characteristic of technology education is the continual development of new technologies and creating innovative applications of already existing technologies. As exciting as these innovations can be, technology educators and school staffs are frequently challenged to accomplish high levels of implementation. The metaphor of the…

  16. Quality Control in Clinical Laboratory Samples

    DTIC Science & Technology

    2015-01-01

    misalignment are important aspects to observing shifting L-J charts and adjustments of accuracy over time. Continuous monitoring of quality control testing...calibration misalignment are important aspects to observing shifting L-J charts and 1 adjustments of accuracy over time. Continuous monitoring of...2673rd MDSS, SGSL, Elmendorf AFB, 99506-3702, AK 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/ MONITORING AGENCY NAME(S) AND ADDRESS(ES

  17. Mitochondrial Quality Control in Cardiac Diseases

    PubMed Central

    Campos, Juliane C.; Bozi, Luiz H. M.; Bechara, Luiz R. G.; Lima, Vanessa M.; Ferreira, Julio C. B.

    2016-01-01

    Disruption of mitochondrial homeostasis is a hallmark of cardiac diseases. Therefore, maintenance of mitochondrial integrity through different surveillance mechanisms is critical for cardiomyocyte survival. In this review, we discuss the most recent findings on the central role of mitochondrial quality control processes including regulation of mitochondrial redox balance, aldehyde metabolism, proteostasis, dynamics, and clearance in cardiac diseases, highlighting their potential as therapeutic targets. PMID:27818636

  18. Integrated Design and Implementation of Embedded Control Systems with Scilab.

    PubMed

    Ma, Longhua; Xia, Feng; Peng, Zhe

    2008-09-05

    Embedded systems are playing an increasingly important role in control engineering. Despite their popularity, embedded systems are generally subject to resource constraints and it is therefore difficult to build complex control systems on embedded platforms. Traditionally, the design and implementation of control systems are often separated, which causes the development of embedded control systems to be highly timeconsuming and costly. To address these problems, this paper presents a low-cost, reusable, reconfigurable platform that enables integrated design and implementation of embedded control systems. To minimize the cost, free and open source software packages such as Linux and Scilab are used. Scilab is ported to the embedded ARM-Linux system. The drivers for interfacing Scilab with several communication protocols including serial, Ethernet, and Modbus are developed. Experiments are conducted to test the developed embedded platform. The use of Scilab enables implementation of complex control algorithms on embedded platforms. With the developed platform, it is possible to perform all phases of the development cycle of embedded control systems in a unified environment, thus facilitating the reduction of development time and cost.

  19. Integrated Design and Implementation of Embedded Control Systems with Scilab

    PubMed Central

    Ma, Longhua; Xia, Feng; Peng, Zhe

    2008-01-01

    Embedded systems are playing an increasingly important role in control engineering. Despite their popularity, embedded systems are generally subject to resource constraints and it is therefore difficult to build complex control systems on embedded platforms. Traditionally, the design and implementation of control systems are often separated, which causes the development of embedded control systems to be highly time-consuming and costly. To address these problems, this paper presents a low-cost, reusable, reconfigurable platform that enables integrated design and implementation of embedded control systems. To minimize the cost, free and open source software packages such as Linux and Scilab are used. Scilab is ported to the embedded ARM-Linux system. The drivers for interfacing Scilab with several communication protocols including serial, Ethernet, and Modbus are developed. Experiments are conducted to test the developed embedded platform. The use of Scilab enables implementation of complex control algorithms on embedded platforms. With the developed platform, it is possible to perform all phases of the development cycle of embedded control systems in a unified environment, thus facilitating the reduction of development time and cost. PMID:27873827

  20. Neural Generalized Predictive Control: A Newton-Raphson Implementation

    NASA Technical Reports Server (NTRS)

    Soloway, Donald; Haley, Pamela J.

    1997-01-01

    An efficient implementation of Generalized Predictive Control using a multi-layer feedforward neural network as the plant's nonlinear model is presented. In using Newton-Raphson as the optimization algorithm, the number of iterations needed for convergence is significantly reduced from other techniques. The main cost of the Newton-Raphson algorithm is in the calculation of the Hessian, but even with this overhead the low iteration numbers make Newton-Raphson faster than other techniques and a viable algorithm for real-time control. This paper presents a detailed derivation of the Neural Generalized Predictive Control algorithm with Newton-Raphson as the minimization algorithm. Simulation results show convergence to a good solution within two iterations and timing data show that real-time control is possible. Comments about the algorithm's implementation are also included.

  1. Expanding Quality for Infants and Toddlers: Colorado Implements Touchpoints

    ERIC Educational Resources Information Center

    Watson, Wendy; Koehn, Jo; Desrochers, Lisa

    2012-01-01

    As coordinators of local early childhood coalitions working to improve the quality of early childhood programs, the authors had been looking for ways to support early childhood professionals in their efforts to strengthen partnerships with families, support young children's healthy emotional development, and continue to promote developmentally…

  2. Implementing Total Quality Management in the School: Challenges and Opportunity.

    ERIC Educational Resources Information Center

    Murgatroyd, Stephen

    1993-01-01

    Total Quality Management (TQM) is not another"add-on" but a wholly reconceived approach to managing educational institutions. Some common start-up problems are lack of feasible leadership commitment, poor data and deployment plans, and inadequate managerial skills. Postlaunch problems include team and measurement mania, overzealous selling of…

  3. Quality assurance growing pains: a state perspective on implementing an organizational-wide quality system in environmental laboratories.

    PubMed

    Siders, S D

    1999-01-01

    To implement an effective and efficient quality system in a network of established environmental testing laboratories requires a committed long-term effort that is potentially fraught with multiple obstacles. This presentation discusses one state's ongoing efforts at implementing such a system. First is the need to convince management of the rationale for a quality systems-based approach versus the traditional QA/QC program. Once development of a quality system has been sanctioned, a team-based approach utilizing project planning tools is a good way to approach the effort. Resources are assigned to the development of key quality system components, and generally a phased-deployment or roll-out works best. Once implementation is underway, assuring operational utilization and compliance with the quality system are vital steps in the process. Important to successful implementation is ongoing assessment and refinement of the quality system. Fundamental and key elements of the laboratory quality system are numerous and need to work in concert with each other. Quality system elements to be discussed in the presentation range from management and QA roles and functions to the typical documentation of laboratory policies and procedures. Numerous QA assessment tools and other vital quality system practices that play an important role in making a complete quality system are addressed. In addition, efforts must be undertaken to integrate the laboratory quality system with other management systems within the organization. The bottom line is that all environmental laboratories need a quality system more now than ever. Data users need it. Customers' expectations for data quality are high. USEPA policy and/or programs call for it. Additionally, good quality systems can benefit the organization in multiple ways and help avoid the "pay-me-now or pay-me-later" syndrome. In conclusion, all environmental testing laboratories (i.e., academic, private, commercial and especially

  4. 7 CFR 90.103 - Maintenance of quality control records.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 3 2012-01-01 2012-01-01 false Maintenance of quality control records. 90.103 Section... LABORATORY TESTING PROGRAMS INTRODUCTION Quality Assurance § 90.103 Maintenance of quality control records. Quality control records pertaining, but not limited to the following areas, shall be retained by...

  5. 7 CFR 58.928 - Quality control tests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 3 2012-01-01 2012-01-01 false Quality control tests. 58.928 Section 58.928... Procedures § 58.928 Quality control tests. All dairy products and other ingredients shall be subject to inspection for quality and condition throughout each processing operation. Quality control tests shall...

  6. 7 CFR 58.335 - Quality control tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Quality control tests. 58.335 Section 58.335... Procedures § 58.335 Quality control tests. All milk, cream and related products are subject to inspection for quality and condition throughout each processing operation. Quality control tests shall be made on...

  7. 7 CFR 90.103 - Maintenance of quality control records.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 3 2013-01-01 2013-01-01 false Maintenance of quality control records. 90.103 Section... LABORATORY TESTING PROGRAMS INTRODUCTION Quality Assurance § 90.103 Maintenance of quality control records. Quality control records pertaining, but not limited to the following areas, shall be retained by...

  8. 7 CFR 58.642 - Quality control tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 3 2013-01-01 2013-01-01 false Quality control tests. 58.642 Section 58.642... Procedures § 58.642 Quality control tests. All mix ingredients shall be subject to inspection for quality and condition throughout each processing operation. Quality control tests shall be made on flow line samples...

  9. 7 CFR 58.928 - Quality control tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Quality control tests. 58.928 Section 58.928... Procedures § 58.928 Quality control tests. All dairy products and other ingredients shall be subject to inspection for quality and condition throughout each processing operation. Quality control tests shall...

  10. 7 CFR 58.928 - Quality control tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 3 2014-01-01 2014-01-01 false Quality control tests. 58.928 Section 58.928... Procedures § 58.928 Quality control tests. All dairy products and other ingredients shall be subject to inspection for quality and condition throughout each processing operation. Quality control tests shall...

  11. 7 CFR 58.642 - Quality control tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Quality control tests. 58.642 Section 58.642... Procedures § 58.642 Quality control tests. All mix ingredients shall be subject to inspection for quality and condition throughout each processing operation. Quality control tests shall be made on flow line samples...

  12. 7 CFR 58.335 - Quality control tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 3 2014-01-01 2014-01-01 false Quality control tests. 58.335 Section 58.335... Procedures § 58.335 Quality control tests. All milk, cream and related products are subject to inspection for quality and condition throughout each processing operation. Quality control tests shall be made on...

  13. 7 CFR 58.335 - Quality control tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Quality control tests. 58.335 Section 58.335... Procedures § 58.335 Quality control tests. All milk, cream and related products are subject to inspection for quality and condition throughout each processing operation. Quality control tests shall be made on...

  14. 7 CFR 58.335 - Quality control tests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 3 2012-01-01 2012-01-01 false Quality control tests. 58.335 Section 58.335... Procedures § 58.335 Quality control tests. All milk, cream and related products are subject to inspection for quality and condition throughout each processing operation. Quality control tests shall be made on...

  15. 7 CFR 58.642 - Quality control tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 3 2014-01-01 2014-01-01 false Quality control tests. 58.642 Section 58.642... Procedures § 58.642 Quality control tests. All mix ingredients shall be subject to inspection for quality and condition throughout each processing operation. Quality control tests shall be made on flow line samples...

  16. 7 CFR 90.103 - Maintenance of quality control records.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 3 2014-01-01 2014-01-01 false Maintenance of quality control records. 90.103 Section... LABORATORY TESTING PROGRAMS INTRODUCTION Quality Assurance § 90.103 Maintenance of quality control records. Quality control records pertaining, but not limited to the following areas, shall be retained by...

  17. 7 CFR 58.928 - Quality control tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Quality control tests. 58.928 Section 58.928... Procedures § 58.928 Quality control tests. All dairy products and other ingredients shall be subject to inspection for quality and condition throughout each processing operation. Quality control tests shall...

  18. 7 CFR 58.928 - Quality control tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 3 2013-01-01 2013-01-01 false Quality control tests. 58.928 Section 58.928... Procedures § 58.928 Quality control tests. All dairy products and other ingredients shall be subject to inspection for quality and condition throughout each processing operation. Quality control tests shall...

  19. 7 CFR 58.335 - Quality control tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 3 2013-01-01 2013-01-01 false Quality control tests. 58.335 Section 58.335... Procedures § 58.335 Quality control tests. All milk, cream and related products are subject to inspection for quality and condition throughout each processing operation. Quality control tests shall be made on...

  20. 7 CFR 58.642 - Quality control tests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 3 2012-01-01 2012-01-01 false Quality control tests. 58.642 Section 58.642... Procedures § 58.642 Quality control tests. All mix ingredients shall be subject to inspection for quality and condition throughout each processing operation. Quality control tests shall be made on flow line samples...

  1. 7 CFR 58.642 - Quality control tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Quality control tests. 58.642 Section 58.642... Procedures § 58.642 Quality control tests. All mix ingredients shall be subject to inspection for quality and condition throughout each processing operation. Quality control tests shall be made on flow line samples...

  2. Implementation of Network Redundancy in Environment of Road Tunnel Control

    NASA Astrophysics Data System (ADS)

    Cerovská, Anna; Spalek, Juraj

    Availability of individual segments of a road tunnel control system is directly dependent on network infrastructure. A safe tunnel requires a 100 % availability of control. One of the alternatives how to approach the fulfillment of this requirement is the implementation of hardware and link redundancy to the network topology of the road tunnel by means of mechanisms that enable to improve the failure tolerance in Ethernet networks.

  3. Mechanically implementable accommodation matrices for passive force control

    SciTech Connect

    Goswami, A.; Peshkin, M.

    1999-08-01

    Robot force control implemented by means of passive mechanical devices has inherent advantages over active implementations with regard to stability, response rapidity, and physical robustness. The class of devices considered in this paper consists of a Stewart platform-type mechanism interconnected with a network of adjustable mechanical elements such as springs and dampers. The control law repertoire of such a device, imagined as a robot wrist, is given by the range of admittance matrices that it may be programmed to possess. This paper focuses on wrists incorporating damper networks for which the admittance matrices reduce to accommodation or inverse-damping matrices. The authors show that a hydraulic network of fully adjustable damper elements may attain any diagonally dominant accommodation matrix. They describe the technique of selecting the individual damping coefficients to design a desired matrix. They identify the set of dominant matrices as a polyhedral convex cone in the space of matrix entries, and show that each dominant matrix can be composed of a positive linear combination of a fixed set of basis matrices. The overall wrist-accommodation matrix is obtained by projecting the accommodation matrix of the damper network through the wrist kinematics. The linear combination of the dominant basis matrices projected through the wrist kinematics generates the entire space of mechanically implementable force-control laws. The authors quantify the versatility of mechanically implementable force-control laws by comparing this space to the space of all matrices.

  4. Institutional Controls: A Guide to Preparing Institutional Control Implementation and Assurance Plans at Contaminated Sites

    EPA Pesticide Factsheets

    The purpose of this document is to provide guidance to the EPA Regions for developing Institutional Control Implementation and Assurance Plans (ICIAPs) at contaminated sites where the response action includes an institutional controls (ICs) component.

  5. Implementing Composite Quality Metrics for Bipolar Disorder: Towards a More Comprehensive Approach to Quality Measurement

    PubMed Central

    Kilbourne, Amy M.; Farmer, Carrie; Welsh, Deborah; Pincus, Harold Alan; Lasky, Elaine; Perron, Brian; Bauer, Mark S.

    2011-01-01

    Objective We implemented a set of processes of care measures for bipolar disorder that reflect psychosocial, patient preference, and continuum of care approaches to mental health, and examined whether veterans with bipolar disorder receive care concordant with these practices. Method Data from medical record reviews were used to assess key processes of care for 433 VA mental health outpatients with bipolar disorder. Both composite and individual processes of care measures were operationalized. Results Based on composite measures, 17% had documented assessment of psychiatric symptoms (e.g., psychotic, hallucinatory), 28% had documented patient treatment preferences (e.g., reasons for treatment discontinuation), 56% had documented substance abuse and psychiatric comorbidity assessment, and 62% had documentation of adequate cardiometabolic assessment. No-show visits were followed up 20% of the time and monitoring of weight gain was noted in only 54% of the patient charts. In multivariate analyses, history of homelessness (OR=1.61; 95% CI=1.05-2.46) and nonwhite race (OR=1.74; 95%CI=1.02-2.98) were associated with documentation of psychiatric symptoms and comorbidities, respectively. Conclusions Only half of patients diagnosed with bipolar disorder received care in accordance with clinical practice guidelines. High quality treatment of bipolar disorder includes not only adherence to treatment guidelines but also patient-centered care processes. PMID:21112457

  6. "How to Strike the Right Balance between Quality Assurance and Quality Control in the Perceptions of Individual Lecturers": A Comparison of UK and Dutch Higher Education Institutions

    ERIC Educational Resources Information Center

    Teelken, Christine; Lomas, Laurie

    2009-01-01

    This paper focuses on the way lecturers observe, feel restrained by and cope with quality management systems that have been implemented in the higher education systems of the United Kingdom and the Netherlands. As two sides of the same coin, quality enhancement and quality control are of increased significance in European Higher Education…

  7. 75 FR 14077 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; NOX

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-24

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Illinois; NO X... INFORMATION CONTACT: John Summerhays, Environmental Scientist, Criteria Pollutant Section, Air Programs...

  8. 75 FR 5514 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Correction... INFORMATION CONTACT: Christos Panos, Environmental Engineer, Criteria Pollutant Section, Air Programs...

  9. North Coast Unified Air Quality Management District, California; Final Limited Federal Implementation Plan

    EPA Pesticide Factsheets

    EPA is finalizing a limited Federal Implementation Plan (FIP) under the Clean Air Act (CAA or Act) to apply to the North Coast Unified Air Quality Management District (North Coast Unified AQMD or District) in California.

  10. 76 FR 68698 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revision to Nitrogen...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-07

    ...- 9487-7] Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revision to Nitrogen... Commonwealth of Virginia that revises regulatory language that inadvertently ended its nitrogen oxides (NO...

  11. 78 FR 30208 - Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Prevention of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Prevention of Significant Deterioration Greenhouse Gas Tailoring and Biomass Deferral Rule...

  12. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... From the Federal Register Online via the Government Publishing Office ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA...

  13. 78 FR 19434 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ...; Transportation Conformity Regulations AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule... incorporate Federal revisions to transportation conformity requirements. In the Final Rules section of this... Quality Implementation Plans; Virginia; Transportation Conformity Regulations,'' that is located in...

  14. Roadmap for Early Childhood and K-12 Data Linkages: Key Focus Areas to Ensure Quality Implementation. Quality Implementation Roadmaps

    ERIC Educational Resources Information Center

    Data Quality Campaign, 2016

    2016-01-01

    Every state can create secure, robust linkages between early childhood and K-12 data systems, and effectively use the information from these linkages to implement initiatives to support programs and children, answer key policy questions, and be transparent about how the state's early childhood investments prepare students for success in school and…

  15. Forensic entomology: implementing quality assurance for expertise work.

    PubMed

    Gaudry, Emmanuel; Dourel, Laurent

    2013-09-01

    The Department of Forensic Entomology (Institut de Recherche Criminelle de la Gendarmerie Nationale, France) was accredited by the French Committee of Accreditation (Cofrac's Healthcare section) in October 2007 on the basis of NF EN ISO/CEI 17025 standard. It was the first accreditation in this specific field of forensic sciences in France and in Europe. The present paper introduces the accreditation process in forensic entomology (FE) through the experience of the Department of Forensic Entomology. Based upon the identification of necrophagous insects and the study of their biology, FE must, as any other expertise work in forensic sciences, demonstrate integrity and good working practice to satisfy both the courts and the scientific community. FE does not, strictly speaking, follow an analytical method. This could explain why, to make up for a lack of appropriate quality reference, a specific documentation was drafted and written by the staff of the Department of Forensic Entomology in order to define working methods complying with quality standards (testing methods). A quality assurance system is laborious to set up and maintain and can be perceived as complex, time-consuming and never-ending. However, a survey performed in 2011 revealed that the accreditation process in the frame of expertise work has led to new well-defined working habits, based on an effort at transparency. It also requires constant questioning and a proactive approach, both profitable for customers (magistrates, investigators) and analysts (forensic entomologists).

  16. Implementing the ISO 9002 quality system at an aluminum cast house

    NASA Astrophysics Data System (ADS)

    McParland, Tony; Prebble, Jonathan

    1992-11-01

    Industries worldwide have lately been carefully considering the benefits of accreditation under the ISO 9000 series of quality standards. Among the chief concerns are the feasibility and the cost of accreditation. This article presents a brief history of the implementation of the 150 9002 quality system at the cast house of Anglesey Aluminium. Anglesey found that the implementation certainly requires a great deal of effort, but the end result is well worth the work.

  17. Implementing Total Quality Management in the Department of Defense

    DTIC Science & Technology

    1991-01-01

    America and the DOD. So far, the business schools of American colleges and universities are lagging behind industry in teaching TQM philosophy and...methods. We in DOD have no control over that, but we do have control over our schoolhouses! If the business schools will not teach TQM, then we can. DOD

  18. Implementation of sensorless control of radial magnetic bearings

    SciTech Connect

    Gurumoorthy, R.; Soong, W.L.; Lyons, J.P.; Storace, A.F.

    1995-12-31

    This paper discusses preliminary results of the implementation of sensorless position control of a radial magnetic bearing. The magnetic bearing is controlled using a mutually exclusive excitation scheme; where only one out of the two available actuators in each axis is active at any time. The unused actuator is used for sensorless position estimation. The sensorless position scheme is based on measuring the change of airgap reluctance with the variation of airgap between the actuator and the rotor. The airgap reluctance is measured by driving the unused actuators with short probing pulses and measuring the resultant change of current. The rotor position is controlled using independent Proportional Integral Derivative (PID) control of each axis. This offers a simple and robust controller. The authors present the design of a PID controller. Preliminary experimental results are presented showing levitation at standstill. The sensorless control algorithm has been implemented on a digital controller and levitation of the test-rig rotor with one radial bearing operated without a position sensor has been demonstrated. Due to the inherent double integration from the rotor inertia, the derivative component of the position is required for stabilizing the system. However this also inherently amplifies measurement noise and thus low-noise position estimation is required. Means for reducing the existing noise in the position estimate, in the test-rig system, by increasing the current sensor resolution and using greater filtering are being investigated.

  19. The Quality, Implementation, and Evaluation Model: A Clinical Practice Model for Sustainable Interventions.

    PubMed

    Talsma, AkkeNeel; McLaughlin, Margaret; Bathish, Melissa; Sirihorachai, Rattima; Kuttner, Rafael

    2014-08-01

    Major efforts have been directed toward the implementation of sustainable quality improvement. To date, progress has been noted using various metrics and performance measures; however, successful implementation has proven challenging. The Quality, Implementation, and Evaluation (QIE) model, derived from Donabedian's structure component, presents a framework for implementation of specific activities. The QIE model consists of Policy, Patient Preparedness, Provider Competency, and Performance and Accountability, to guide specific practice initiatives. The implementation of alcohol-based pre-operative skin prep was evaluated in a sample of 17 hospitals and demonstrated that hospitals actively engaged in the components of the model demonstrated a significantly higher use of alcohol-based skin preparation agent than hospitals that did not engage in QIE model activities. The QIE model presents a powerful and actionable implementation model for mid-level management and clinical leadership. Future studies will further evaluate the impact of the specific components of the QIE model.

  20. Maskshop data preparation and quality control: from supplier management viewpoint

    NASA Astrophysics Data System (ADS)

    Deng, Erwin; Lee, Rachel; Lee, Chun Der

    2012-06-01

    In semiconductor industry, many wafer fabs acquire masks from qualified suppliers because they do not have in-house maskshops. Under the circumstances, for these fabs, their main objectives of mask supplier management are to carry out gaining stable quality performance with punctual delivery and acceptable prices. At present, interests in mask supplier management are launching into mask data preparation (MDP) field when it's beginning to face raised challenges to output correct results all the time. These incoming tasks are mainly due to increasingly complicated MDP demand from wafer fabs for implementing various approaches on masks and tape-out to support wafer production and tight cycle-time control. In this paper, it shows major factors of MDP quality issues from analyzing past accidents in our suppliers and proposes possible approaches for achieving further improvement.