Science.gov

Sample records for quality management plans

  1. Region 7 Quality Management Plan

    EPA Pesticide Factsheets

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  2. Illinois water quality management plan

    SciTech Connect

    Not Available

    1992-12-01

    The report describes the purpose of the plan to consolidate and streamline portions of approved state and areawide water quality management (WQM) plans in order to facilitate their usage in the operations of all designated WQM agencies. The report identifies both point and nonpoint pollution sources, reviews policies and regulations already in place and makes recommendations for pollution prevention and control. Information on the plan's management structure is also included.

  3. Total Quality Management Implementation Plan.

    DTIC Science & Technology

    1989-06-01

    E 14. SUBJECT TERMS 15. NUMBER OF PAGES TOM ( Total Quality Management ), Continuous Process Improvement,_________ Depot Operations, Supply Support 16... Quality Management Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION Defense General...Reduction PrOtect (O704.Ot8SL Wasilngton, OC 20503j. .EPORT DATE 3. REPORT TYPE AND DATES COVERED June 19891 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total

  4. Waste Management Quality Assurance Plan

    SciTech Connect

    Not Available

    1993-11-30

    Lawrence Berkeley Laboratory`s Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department`s activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A.

  5. Waste Management Quality Assurance Plan

    SciTech Connect

    Waste Management Group

    2006-08-14

    The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs.

  6. Total quality management program planning

    SciTech Connect

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  7. Defense Depot Tracy Total Quality Management Plan

    DTIC Science & Technology

    1989-07-01

    PAGES TQM ( Total Quality Management ), Depot Operations, Continuous Process Improvement 16. PRICE CODE 17. SECURITY CLASSIFICATION 18. SECURITY...make up our pcrceptions of Total Quality Management . Our goal is to improve those proven management processes that have brought us success while being...MANIAGEMENT F. QUALITY AUDITS OF PRODUCTS AND OPERATIONS ASSETS MANAGEMENT 00 i .......... / ~899 29 03 1 EFENSE DEPOT TACY TOTAL QUALITY MANAGEMENT PLAN

  8. Checklist for Reviewing EPA Quality Management Plans

    EPA Pesticide Factsheets

    This checklist will be used to review the Quality Management Plans (QMPs) that are submitted to the Quality Staff of the Office of Environmental Information (OEI) for Agency review under EPA Order 5360.1 A2.

  9. Total quality management -- Remedial actions planning program

    SciTech Connect

    Petty, J.L.; Horne, T.E.

    1989-01-01

    This paper describes the management approach being taken within the Hazardous Waste Remedial Actions Program (HAZWRAP) Support Contractor Office (SCO) to ensure quality of services in a highly competitive waste management environment. An overview is presented of the contractor support role assigned to Martin Marietta Energy Systems, Inc., by the Department of Energy (DOE) national program for managing hazardous waste. The HAZWRAP SCO mission, organizational structure, and major programs are outlined, with emphasis on waste management planning for the DOE Work for Others (WFO) Program. The HAZWRAP SCO provides waste management technical support, via interagency agreements between DOE and various Department of Defense (DOD) agencies for DOD sponsors planning remedial response actions. The remainder of the paper focuses on how the concept of Total Quality Management is applied to the HAZWRAP Remedial Actions Planning (RAP) Program. The management challenge is to achieve quality on a ''system'' basis where all functional elements of program management synergistically contribute to the total quality of the effort. The quality assurance (QA) program requirements applied to the RAP Program and its subcontractors are discussed. The application of management principles in the areas of program management, procurement, and QA to achieve total quality is presented. 3 refs.

  10. Quality Management Plan for the Environmental Assessment and Innovation Division

    EPA Pesticide Factsheets

    Quality management plan (QMP) which identifies the mission, roles, responsibilities of personnel with regard to quality assurance and quality management for the environmental assessment and innovation division.

  11. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management...

  12. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management...

  13. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...

  14. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management...

  15. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management...

  16. Total Quality Management Implementation Plan for Military Personnel Management

    DTIC Science & Technology

    1989-09-01

    2050.. )ATE 3. REPORT TYPE AND DATES CO VERED 4. TITLE AND SUBTITLE 5,rrmir18 . FUNDING NUMBERS Total Quality Management Implementation Plan for...SUBJECT TERMS 15. NUMBER OF PAGES TQM ( Total Quality Management ), Military Personnel Management, Continuous Process Improvement 16. PRICE CODE 17. SECURITY...UNCLASSIFIED UNCLASSIFIED UL NSN 7540-01-280-5500 Standard Form 298 (Rev. 2-89) Prescribed by ANSI Std Z39-16 296-102 TOTAL QUALITY MANAGEMENT I

  17. Astronomical Instrumentation Systems Quality Management Planning: AISQMP

    NASA Astrophysics Data System (ADS)

    Goldbaum, Jesse

    2017-06-01

    The capability of small aperture astronomical instrumentation systems (AIS) to make meaningful scientific contributions has never been better. The purpose of AIS quality management planning (AISQMP) is to ensure the quality of these contributions such that they are both valid and reliable. The first step involved with AISQMP is to specify objective quality measures not just for the AIS final product, but also for the instrumentation used in its production. The next step is to set up a process to track these measures and control for any unwanted variation. The final step is continual effort applied to reducing variation and obtaining measured values near optimal theoretical performance. This paper provides an overview of AISQMP while focusing on objective quality measures applied to astronomical imaging systems.

  18. EPA Region 3 Quality Management Plans

    EPA Pesticide Factsheets

    Has links to resources that describe the Region's Quality Assurance Program, which is a collection of the Region's ongoing quality assurance (QA) policies, procedures, responsibilities and management systems.

  19. Project Hanford management contract quality improvement project management plan

    SciTech Connect

    ADAMS, D.E.

    1999-03-25

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

  20. DESC (Defense Electronics Supply Center) Total Quality Management Plan

    DTIC Science & Technology

    1989-04-01

    Paoerwort Reduction Proodt(0704.01 ge. Washington. DC 20S03 4. TITLE AND SUBTITLE Api598 . FUNDING NUMBERS DESC Total Quality Management Master Plan...OF PAGES TQM ( Total Quality Management ), Continuous Process Improvement,_________ cTainingManagement 16. PRICE CODE 17. SECURITY CLASSIFICATION 18... QUALITY MANAGEMENT As you read the DESC Total Quality Management Plan, I ask each of you to make a commitment to continuously strive for improvement

  1. Hanford Sampling Quality Management Plan (HSQMP)

    SciTech Connect

    Hyatt, J.E.

    1995-04-28

    This document provides a management tool for evaluating and designing the appropriate elements of a field sampling program. This document provides discussion of the elements of a program and is to be used as a guidance document during the preparation of project and/or function specific documentation. This document does not specify how a sampling program shall be organized. The HSQMP is to be used as a companion document to the Hanford Analytical Services Quality Assurance Plan (HASQAP) DOE/RL-94-55. The generation of this document was enhanced by conducting baseline evaluations of current sampling organizations. Valuable input was received from members of field and Quality Assurance organizations. The HSQMP is expected to be a living document. Revisions will be made as regulations and or Hanford Site conditions warrant changes in the best management practices. Appendices included are: summary of the sampling and analysis work flow process, a user`s guide to the Data Quality Objective process, and a self-assessment checklist.

  2. Total Quality Management Office for Contracting Integrity Implementation Plan

    DTIC Science & Technology

    1989-07-01

    REPORT______ANDDATESCOVERED 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total Quality Management Office for Contracting Integrity Implementatiun Plan 6. AUTHOR(S) 7...01-280-5500 Standard Form 298 (Rev. 2-89) P’,croed 1:, ANSI Std 3J9-16 29d. 102 4 TOTAL QUALITY MANAGEMENT OFFICE FOR CONTRACTING INTEGRITY...IMPLEMENTATION PLAN According to the Total Quality Management (TQM) Master Plan, each PSE head, supported by Working Groups, will implement the HQ DLA Master

  3. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan being...

  4. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to: (1...

  5. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan being...

  6. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to: (1...

  7. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to: (1...

  8. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan being...

  9. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan...

  10. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to:...

  11. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan...

  12. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to:...

  13. Office of General Counsel Total Quality Management Plan

    DTIC Science & Technology

    1989-07-01

    Total Quality Management Plan 6. AUTHOR(S) 7...of General Counsel. - r DTIC 65 LE- E CTEn’" SEP291 989 14. SUBJECT TERMS 15. NUMBER OF PAGES TQM ( Total Quality Management ), Office of General...89) Pra-ifcr~bed ANSI Sid 139-1S ""-"’- ", ~ mmmmmu10n S S OFFICE OF GENERAL COUNSEL TOTAL QUALITY MANAGEMENT PLAN Acc’, ’ 7or. .?:" t ’_7 Codes K

  14. Total Quality Management Plan: Technical and Logistics Services

    DTIC Science & Technology

    1989-05-01

    ATES COVERED 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total Quality Management Plan Technical and Logistics Services 6. AUTHOR(S) 7. PERFORMING...NUMBER OF PAGES TQM ( Total Quality Management ), Technical and Logistics Services, Continuous Process Improvement 16. PRICE CODE 17. SECURITY...Programs C-6 2. ’LFA a. DRMS C-6 b. Defense Supply Centers C-7 c. DLSC C-7 d. DTIC C-8 11. TOTAL QUALITY MANAGEMENT PLAN TECHNICAL AND LOGISTICS SERVICES

  15. Total Quality Management Plan: Office of Public Affairs

    DTIC Science & Technology

    1989-07-01

    AND DATES COVERED I July 1989 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS Total Quality Management Plan Office of Public Affairs 6. AUTHOR(S) 7...ANSI %to 09-10 2g6. 1O2 TOTAL QUALITY MANAGEMENT PLAN Defense Logistics Agency Office of Public Affairs Ace!;son For NT-S G":I DTTC T ,’ Ju:.. t if...12 CONCEPTS We recognize that the following concepts are vital to total quality management (TQM) as it applies specifically

  16. Total Quality Management Implementation Plan: Defense Depot, Ogden

    DTIC Science & Technology

    1989-07-01

    NUMBERS Total Quality Management Implementation Plan Defense Depot Ogden 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING...PAGES TQM ( Total Quality Management ), Continuous Process Improvement, Depot Operations, Process Action Teams 16. PRICE CODE 17. SECURITY...034 A Message From The Commander On Total Quality Management i fully support the DLA aoproacii to Total Quality Management . As stated by General

  17. DLA-X Total Quality Management (TQM) Implementation Plan

    DTIC Science & Technology

    1989-07-01

    PAGES TOM ( Total Quality Management ), Continuous Process Improvement.( .) 4L-- Administration 16. PRICE CODE 17. SECURITY CLASSIFICATION 18. SECURITY...NSN 7540-01-280-5500 Standard Form 298 (Rev. 2-89) Pr.-cr,bed by ANSI Std ,,fl.f 296-102 DLA-X TOTAL QUALITY MANAGEMENT (TQM) IMPLEMENTATION PLAN o...application of proven Total Quality Management techniques. Quality Policy: Responsibility for quality is delegated to every employee ;11 DLA-X. Every

  18. Hanford Sampling Quality Management Plan (HSQMP)

    SciTech Connect

    Hyatt, J.E.

    1995-06-01

    HSQMP establishes quality requirements in response to DOE Order 5700. 6C and to 10 Code of Federal Regulations 830.120. HSQMP is designed to meet the needs of Richland Operations Office for controlling the quality of services provided by sampling operations. It is issued through the Analytical Services Program of the Waste Programs Division. This document describes the Environmental Sampling and Analysis Program activities considered to represent the best management activities necessary to achieve a sampling program with adequate control.

  19. DPSC (Defense Personnel Support Center) Total Quality Management Master Plan

    DTIC Science & Technology

    1989-07-01

    SUBTITLE 5. FUNDING NUMBERS DPSC Total Quality Management Master Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) B. PERFORMING...quality supported solider, sailor, airman and marine. % j cl 1 14. SUBJECT TERMS I 1S. NUMBER OF PAGES TQM ( Total Quality Management ), Continuous...THE COMMANDER ON TOTAL QUALITY MANAGEMENT i SECTION I INTRODUCTION 1 II CONCEPTS 6 TQM Basics 7 Continuous Process Improvement 7 DoD TQM Philosophy 9

  20. DCSC (Defense Construction Supply Center) Total Quality Management Master Plan

    DTIC Science & Technology

    1989-07-01

    DCSC Total Quality Management Master Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) B. PERFORMING ORGANIZATION REPORT NUMBER...1989 14. SUBJECT TERMS 15. NUMBER OF PAGES TQM ( Total Quality Management ), Continuous Process Improvement, Management, Supply Support ... 16. PRICE...UNCLASSIFIED I UNCLASSIFIED UNCLASSIFIED UL NSN 754001-280-5500 Standard Form 298 (Rev. 2-89) Pttrcrbed by ANSI Std 139-I 298. 102 TOTAL QUALITY MANAGEMENT MASTER

  1. Defense Depot Mechanicsburg Total Quality Management Implementation Plan

    DTIC Science & Technology

    1989-06-01

    B T I TLEE 5 . FUNDING NUMBERS Defense Depot Mechanicsburg Total Quality Management Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME...Form 298 (Rev. 2-89) L296- 102 Acces.ion For NYI J ... I:: ted DEFENSE DEPOT MECHANICSBURG PENNSYLVANIAL--I By_ TOTAL QUALITY MANAGEMENT K_~ t buty-n...IMPLEMENTATION PLAN Avmail-t!Ilty Codes IvLl c 2Dd/or JUN 3 0 1989 iDizt Special PURPOSE The purpose of this Total Quality Management Implementation

  2. Defense Nuclear Agency Total Quality Management (TQM) implementation plan. Quality management (Final)

    SciTech Connect

    Not Available

    1989-01-01

    The report is the TQM Implementation Plan adopted by the Defense Nuclear Agency. It is based on the DoD Total Quality Management Master Plan, and lists short-, mid-, and long-range goals. A hard copy of slides on the topic of TQM implementation at the Defense Nuclear Agency is attached.

  3. QUALITY MANAGEMENT PLAN FOR THE NATIONAL CHILDREN'S STUDY

    EPA Science Inventory

    EPA has taken the lead, in consort with NIH, in developing the Quality Management Plan (QMP) for the National Children's Study (NCS); the QMP will delineate a systematic planning process for the implementation of the NCS. The QMP will state the goals and objectives of the NCS, th...

  4. QUALITY MANAGEMENT PLAN FOR THE NATIONAL CHILDREN'S STUDY

    EPA Science Inventory

    EPA has taken the lead, in consort with NIH, in developing the Quality Management Plan (QMP) for the National Children's Study (NCS); the QMP will delineate a systematic planning process for the implementation of the NCS. The QMP will state the goals and objectives of the NCS, th...

  5. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... From the Federal Register Online via the Government Publishing Office ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA...

  6. Total Quality Management Implementation Plan: DLA-N

    DTIC Science & Technology

    1989-07-01

    e Wastimto , n. Othe 20 Seato3 4. TITLE AND SUBTITLE S. FUNDING NUMBERS DLA-N Total Quality Management 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S...PAGES TQM ( Total Quality Management ), Continuous Process Improvement.(; , Defense National Stockpile 16. PRICE CODEI17. SECURITY CLASSIFICATION 18...IUNCLASSIFIED UL NSN 7540-01-280-5500 Standard Form 298 (Rev. 2-89) pr"!Cbed ty ANSI Std Z39’B6 296-102 DLA - N TOTAL QUALITY MANAGEMENT IMPLEMENTATION PLAN I

  7. POSTER FOR NRMRL QUALITY MANAGEMENT PLAN (QMP) TRAINING COURSE

    EPA Science Inventory


    NRMRL QMP Training Course
    Contact: Lauren Drees, NRMRL/STD (drees.lauren@epa.gov)

    NRMRL has developed a computer-based course to train personnel in the requirements of the NRMRL Quality Management Plan (QMP). This training course was developed using Trainersoft s...

  8. POSTER FOR NRMRL QUALITY MANAGEMENT PLAN (QMP) TRAINING COURSE

    EPA Science Inventory


    NRMRL QMP Training Course
    Contact: Lauren Drees, NRMRL/STD (drees.lauren@epa.gov)

    NRMRL has developed a computer-based course to train personnel in the requirements of the NRMRL Quality Management Plan (QMP). This training course was developed using Trainersoft s...

  9. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... County Air Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality...

  10. 78 FR 63934 - Approval of Air Quality Implementation Plans; California; El Dorado County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... AGENCY 40 CFR Part 52 Approval of Air Quality Implementation Plans; California; El Dorado County Air... Plan (SIP) revision submitted by California for the El Dorado County Air Quality Management District... Ambient Air Quality Standards (NAAQS). We are proposing to approve the submitted SIP revision under...

  11. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... revisions to the Butte County Air Quality Management District (BCAQMD) and Sacramento Metropolitan...

  12. 77 FR 65133 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... Identification of plan. * * * * * (c) * * * (379) * * * (i) * * * (E) Mojave Desert Air Quality Management... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA...

  13. Procedure for assessing visual quality for landscape planning and management

    NASA Astrophysics Data System (ADS)

    Gimblett, H. Randal; Fitzgibbon, John E.; Bechard, Kevin P.; Wightman, J. A.; Itami, Robert M.

    1987-07-01

    Incorporation of aesthetic considerations in the process of landscape planning and development has frequently met with poor results due to its lack of theoretical basis, public involvement, and failure to deal with spatial implications. This problem has been especially evident when dealing with large areas, for example, the Adirondacks, Scenic Highways, and National Forests and Parks. This study made use of public participation to evaluate scenic quality in a portion of the Niagara Escarpment in Southern Ontario, Canada. The results of this study were analyzed using the visual management model proposed by Brown and Itami (1982) as a means of assessing and evaluating scenic quality. The map analysis package formulated by Tomlin (1980) was then applied to this assessment for the purpose of spatial mapping of visual impact. The results of this study illustrate that it is possible to assess visual quality for landscape/management, preservation, and protection using a theoretical basis, public participation, and a systematic spatial mapping process.

  14. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of the...

  15. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of the...

  16. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of the...

  17. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of the...

  18. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of the...

  19. The quality performance matrix: New York State's model for targeting quality improvement in managed care plans.

    PubMed

    Roohan, Patrick J; Gesten, Foster; Pasley, Beverly; Schettine, Anne M

    2002-01-01

    This article describes a methodology developed by the New York State Department of Health to analyze health plan performance data using two benchmarks: comparison to peers and comparison to historic results. It explains how that analysis is used to target quality improvement. Through this process the department effectively partners with health plans to foster improvement by identifying problems and barriers, encouraging health plans to set performance goals, and then working with health plans to design action plans to address the barriers. This model can be replicated for use by other states or other entities charged with monitoring quality improvement in managed care.

  20. Classification management plan of groundwater quality in Taiwan

    NASA Astrophysics Data System (ADS)

    Chen, Chun Ming; Chen, Yu Ying; Pan, Shih Cheng; Li, Hui Jun; Hsiao, Fang Ke

    2017-04-01

    Taiwan Environmental Protection Administration has been monitoring regional water quality for 14 years. Since the beginning of 2002 till now, there are 453 regional groundwater monitoring wells in ten groundwater subregions in Taiwan, and the monitoring of groundwater quality has been carried out for a long time. Currently, water quality monitoring project has reached 50 items, while the number of water quality monitoring data has reached more than 20,000. In order to use the monitoring data efficiently, this study constructed the localized groundwater quality indicators of Taiwan. This indicator takes into account the different users' point of view, incorporating the Taiwan groundwater pollution monitoring standards (Category II), irrigation water quality standard and drinking water source water quality standard. 50 items of water quality monitoring projects were simplified and classified. The groundwater quality parameters were divided into five items, such as potability for drinking water, salting, external influence, health influences and toxicity hazard. The weight of the five items of groundwater was calculated comprehensively, and the groundwater quality of each monitoring well was evaluated with three grades of good, ordinary, and poor. According to the monitoring results of the groundwater monitoring wells in October to December of 2016, about 70% of groundwater quality in Taiwan is in good to ordinary grades. The areas with poor groundwater quality were mostly distributed in coastal, agriculture and part of the urban areas. The conductivity or ammonia nitrogen concentration was higher in those regions, showing that groundwater may be salinized or affected by external influences. Groundwater quality indicators can clearly show the current comprehensive situation of the groundwater environment in Taiwan and can be used as a tool for groundwater quality classification management. The indicators can coordinate with the Taiwan land planning policy in the

  1. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    SciTech Connect

    Riddle, Donna L.

    2007-05-03

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, “Quality Assurance Requirements,” ANSI/ASQC E4-2004, “Quality Systems for Environmental Data and Technology Programs – Requirements with Guidance for Use,” and ISO 14001-2004, “Environmental Management Systems,” have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, “Quality Assurance Program,” identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, “QA Program Implementation,” identifies the TAC organizations that have responsibility for

  2. Total Quality Management Implementation Plan Defense Depot Memphis

    DTIC Science & Technology

    1989-07-01

    Total Quality Management Implementation...improvement goals, implementation strategy and milestones. 6’ SEP 291989 /; ELECTE i= E 14. SUBJECT TERMS 15. NUMBER OF PAGES TQM ( Total Quality Management ), Depot...changing work environment where change is the norm. We are talking about changes in attitudes and habits. Total Quality Management is not a

  3. Total Quality Management Implementing Plan for Human Resource Management

    DTIC Science & Technology

    1989-04-01

    ainilO reo)U,;rments for their organiz7at,.ons and provide information o-n course scnIeCUies and ;7ompletions. A new subsystem for labor management... estr ict,_ve interoretations of job-relatedness in approving Agency-+unded training ard aettli~ ’-he best reSult 4or all concerned; increase cross

  4. Quality Assurance Program Plan (QAPP) Waste Management Project

    SciTech Connect

    VOLKMAN, D.D.

    1999-10-27

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

  5. Waste management Quality Assurance Implementing Management Plan (QAIMP). Revision 1

    SciTech Connect

    Not Available

    1992-06-01

    This report contains a summary of the groundwater and surface-water quality monitoring activities to be performed during the 1993 calendar year at the Department of Energy Y- 12 Plant in Oak Ridge, Tennessee (Figure 1). Monitoring activities will be performed in three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (BCHR), (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (UEFPCHR), and (3) the Chestnut Ridge Hydrogeologic Regime (CRHR). The BCHR and UEFPCHR are located within Bear Creek Valley (BCV) and the CRHR is located south of the Y-12 Plant on Chestnut Ridge (Figure 2).

  6. Waste management Quality Assurance Implementing Management Plan (QAIMP)

    SciTech Connect

    Tung, Kam

    1992-06-01

    This report contains a summary of the groundwater and surface-water quality monitoring activities to be performed during the 1993 calendar year at the Department of Energy Y- 12 Plant in Oak Ridge, Tennessee (Figure 1). Monitoring activities will be performed in three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (BCHR), (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (UEFPCHR), and (3) the Chestnut Ridge Hydrogeologic Regime (CRHR). The BCHR and UEFPCHR are located within Bear Creek Valley (BCV) and the CRHR is located south of the Y-12 Plant on Chestnut Ridge (Figure 2).

  7. 76 FR 44493 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality... taking direct final action to approve revisions to the Northern Sierra Air Quality Management...

  8. 76 FR 44535 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality... proposing to approve revisions to the Northern Sierra Air Quality Management District (NSAQMD),...

  9. Office of Command Security Total Quality Management Plan

    DTIC Science & Technology

    1989-07-01

    outlines the Office of Command Security instruction for TQM implementation. Keywords: TQM ( Total Quality Management ), DLA Office of Command Security, Continuous process improvement, Automatic data processing security.

  10. Managing Air Quality - Multi-Pollutant Planning and Control

    EPA Pesticide Factsheets

    Describes how planning controls for multiple pollutants at the same time can save money and time and achieve significant benefits, and how control strategies can address both climate change and air quality.

  11. Quality Assurance Program Plan (QAPP) Waste Management Project

    SciTech Connect

    HORHOTA, M.J.

    2000-12-21

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence.

  12. DCASR (Defense Contract Administration Services Region) St. Louis Total Quality Management Master Plan

    DTIC Science & Technology

    1989-06-01

    This document contains the Defense Contract Administration Services Region (DCASR) St. Louis plan for implementing Total Quality Management . It includes concepts, methodology, goals, execution activities/plans, process improvement initiatives and training. Keywords: Continuous process improvement. (KR)

  13. Corporate management of quality in employee health plans.

    PubMed

    Maxwell, James; Temin, Peter

    2003-01-01

    As large companies move their employees into managed care, they must concern themselves with the quality and price of their employees' health care. Based on a survey of Fortune 500 companies, we show that most are integrating several aspects of quality into their purchasing and contracting decisions by focusing on three dimensions--customer service, network composition, and clinical quality. Companies focus on the customer service dimension while the medical community emphasizes clinical quality.

  14. 76 FR 30896 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the... overwhelmingly formed as a secondary pollutant. (South Coast 2007 Air Quality Management Plan, page ES-9... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  15. 76 FR 54384 - California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-01

    ... AGENCY 40 CFR Part 52 California State Implementation Plan, South Coast Air Quality Management District... to the California State Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District (SCAQMD) Rule 1143, Consumer Paint Thinner & Multi-Purpose Solvents and Rule 1144,...

  16. 78 FR 21581 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... the Antelope Valley Air Quality Management District (AVAQMD), Monterey Bay Unified Air...

  17. ENVIRONMENTAL TECHNOLOGY VERIFICATION PROGRAM: QUALITY AND MANAGEMENT PLAN FOR THE PILOT PERIOD (1995-2000)

    EPA Science Inventory

    Based upon the structure and specifications in ANSI/ASQC E4-1994, Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs, the Environmental Technology Verification (ETV) program Quality and Management Plan (QMP) f...

  18. ENVIRONMENTAL TECHNOLOGY VERIFICATION PROGRAM: QUALITY AND MANAGEMENT PLAN FOR THE PILOT PERIOD (1995-2000)

    EPA Science Inventory

    Based upon the structure and specifications in ANSI/ASQC E4-1994, Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs, the Environmental Technology Verification (ETV) program Quality and Management Plan (QMP) f...

  19. Quality assurance management plan (QAPP) special analytical support (SAS)

    SciTech Connect

    LOCKREM, L.L.

    1999-05-20

    It is the policy of Special Analytical Support (SAS) that the analytical aspects of all environmental data generated and processed in the laboratory, subject to the Environmental Protection Agency (EPA), U.S. Department of Energy or other project specific requirements, be of known and acceptable quality. It is the intention of this QAPP to establish and assure that an effective quality controlled management system is maintained in order to meet the quality requirements of the intended use(s) of the data.

  20. Quality-assurance and data-management plan for water-quality activities in the Kansas Water Science Center, 2014

    USGS Publications Warehouse

    Rasmussen, Teresa J.; Bennett, Trudy J.; Foster, Guy M.; Graham, Jennifer L.; Putnam, James E.

    2014-01-01

    As the Nation’s largest water, earth, and biological science and civilian mapping information agency, the U.S. Geological Survey is relied on to collect high-quality data, and produce factual and impartial interpretive reports. This quality-assurance and data-management plan provides guidance for water-quality activities conducted by the Kansas Water Science Center. Policies and procedures are documented for activities related to planning, collecting, storing, documenting, tracking, verifying, approving, archiving, and disseminating water-quality data. The policies and procedures described in this plan complement quality-assurance plans for continuous water-quality monitoring, surface-water, and groundwater activities in Kansas.

  1. 77 FR 2469 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... to the Antelope Valley Air Quality Management District (AVAQMD) and Imperial County Air Pollution.... * * * * * (G) Antelope Valley Air Quality Management District. (1) Rule 1134, ``Stationary Gas...

  2. Standard Review Plan for Environmental Restoration Program Quality Management Plans. Revision 2

    SciTech Connect

    Not Available

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements.

  3. Sunway Medical Laboratory Quality Control Plans Based on Six Sigma, Risk Management and Uncertainty.

    PubMed

    Jairaman, Jamuna; Sakiman, Zarinah; Li, Lee Suan

    2017-03-01

    Sunway Medical Centre (SunMed) implemented Six Sigma, measurement uncertainty, and risk management after the CLSI EP23 Individualized Quality Control Plan approach. Despite the differences in all three approaches, each implementation was beneficial to the laboratory, and none was in conflict with another approach. A synthesis of these approaches, built on a solid foundation of quality control planning, can help build a strong quality management system for the entire laboratory. Copyright © 2016 Elsevier Inc. All rights reserved.

  4. Commercial managed care plans leaving the Medicaid managed care program in New York State: impact on quality and access.

    PubMed

    Roohan, P J; Conroy, M B; Anarella, J P; Butch, J M; Gesten, F C

    2000-12-01

    To develop sufficient managed care capacity to accomplish the goal of transitioning Medicaid recipients into managed care, state policymakers have relied on commercial health maintenance organizations to open their panels of providers to the Medicaid population. However, while commercial health maintenance organization involvement in Medicaid managed care was high initially, since 1996 New York State has had 14 commercial plans leave the New York State Medicaid Managed Care Program. It has been speculated that the exodus of these commercial plans would have a negative impact on Medicaid enrollees' access and quality of care. This paper attempts to evaluate the impact of this departure from the perspective of quality and access measures and plan audit performance. Univariate and multivariate analyses were performed to evaluation the effect of commercial managed care plans leaving the Medicaid program. The overall performance of plans that remained in the program was compared to that of the plans that chose to leave for the two time periods 1996-1997 and 1998-2000. Access to care, quality of care, and annual audit performance data were analyzed. The departure of commercial health plans from the New York State Medicaid Managed Care Program has not had a statistically significant negative effect on the quality of care provided to Medicaid recipients as evaluated by standardized performance measures. In addition, there were no instances when there was a negative impact of the exit of the commercial plans on access to care. Managed care plans that chose to remain in Medicaid passed the Quality Assurance Reporting Requirements audit at a significantly (P < .01) higher rate than plans that chose to leave. A program consisting of health plans voluntarily participating and committed to Medicaid managed care can provide Medicaid recipients with appropriate access to high-quality health care. The exodus of commercial health plans from New York's Medicaid Managed Care Program

  5. Antelope Valley Air Quality Management District; Approval of California Air Plan Revisions

    EPA Pesticide Factsheets

    EPA is proposing to approve and conditionally approve revisions to the Antelope Valley Air Quality Management District (AVAQMD or “District”) portion of the California State Implementation Plan (SIP).

  6. Stakeholders and Tourism Education. Curriculum Planning Using a Quality Management Framework.

    ERIC Educational Resources Information Center

    Cooper, Chris; Westlake, John

    1998-01-01

    Stakeholder analysis provides insights useful in the educational process for tourism and hospitality education. Stakeholders can influence (1) strategic direction through curriculum planning and (2) measurement of performance through quality management. (SK)

  7. North Coast Unified Air Quality Management District, California; Final Limited Federal Implementation Plan

    EPA Pesticide Factsheets

    EPA is finalizing a limited Federal Implementation Plan (FIP) under the Clean Air Act (CAA or Act) to apply to the North Coast Unified Air Quality Management District (North Coast Unified AQMD or District) in California.

  8. 77 FR 26475 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air Pollution Control... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Eastern Kern, and Santa Barbara County; Air Pollution Control Districts AGENCY...

  9. Supply Operations (DLA-O) Total Quality Management (TQM) Master Plan

    DTIC Science & Technology

    1989-07-01

    This document briefly outlines the DLA Directorate of Supply Operations plan to implement total quality management . It seeks to provide better...service to customers at a lower cost through continuous process improvement and commitment from everyone in the organization. Keywords: TQM ( total Quality Management ), Supply operations; Continuous process improvement. (KR)

  10. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... proposing to approve a revision to the South Coast Air Quality Management District portion of the California... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan; South Coast Air...

  11. 76 FR 70888 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of the... Quality Management District--SCAQMD) (1) Rule 1143, ``Consumer Paint Thinners & Multi-purpose Solvents... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  12. 76 FR 78829 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ... taking direct final action to approve a revision to the South Coast Air Quality Management District... Reference (A) South Coast Air Quality Management District (1) Rule 2005, ``New Source Review for RECLAIM... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  13. 76 FR 50128 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  14. 76 FR 41744 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  15. 78 FR 18244 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  16. 77 FR 13495 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  17. 76 FR 47074 - Revision to the California State Implementation Plan; South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... taking direct final action to approve a revision to the South Coast Air Quality Management District... Air Quality Management District (SCAQMD) Rule 1175, adopted on November 5, 2010, and submitted by the... AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan; South Coast Air...

  18. 76 FR 78871 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of...

  19. 75 FR 32353 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District portion of the...

  20. 78 FR 49992 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... Quality Management District (AVAQMD) and Ventura County Air Pollution Control District (VCAPCD) portions... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air Pollution Control District AGENCY: Environmental Protection...

  1. 76 FR 41717 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the South Coast Air Quality Management...

  2. 75 FR 46880 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  3. 76 FR 72142 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-22

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District portion of the...

  4. Association Between Health Plan Exit From Medicaid Managed Care and Quality of Care, 2006-2014.

    PubMed

    Ndumele, Chima D; Schpero, William L; Schlesinger, Mark J; Trivedi, Amal N

    2017-06-27

    State Medicaid programs have increasingly contracted with insurers to provide medical care services for enrollees (Medicaid managed care plans). Insurers that provide these plans can exit Medicaid programs each year, with unclear effects on quality of care and health care experiences. To determine the frequency and interstate variation of health plan exit from Medicaid managed care and evaluate the relationship between health plan exit and market-level quality. Retrospective cohort of all comprehensive Medicaid managed care plans (N = 390) during the interval 2006-2014. Plan exit, defined as the withdrawal of a managed care plan from a state's Medicaid program. Eight measures from the Healthcare Effectiveness Data and Information Set were used to construct 3 composite indicators of quality (preventive care, chronic disease care management, and maternity care). Four measures from the Consumer Assessment of Healthcare Providers and Systems were combined into a composite indicator of patient experience, reflecting the proportion of beneficiaries rating experiences as 8 or above on a 0-to-10-point scale. Outcome data were available for 248 plans (68% of plans operating prior to 2014, representing 78% of beneficiaries). Of the 366 comprehensive Medicaid managed care plans operating prior to 2014, 106 exited Medicaid. These exiting plans enrolled 4 848 310 Medicaid beneficiaries, with a mean of 606 039 beneficiaries affected by plan exits annually. Six states had a mean of greater than 10% of Medicaid managed care recipients enrolled in plans that exited, whereas 10 states experienced no plan exits. Plans that exited from a state's Medicaid market performed significantly worse prior to exiting than those that remained in terms of preventive care (57.5% vs 60.4%; difference, 2.9% [95% CI, 0.3% to 5.5%]), maternity care (69.7% vs 73.6%; difference, 3.8% [95% CI, 1.7% to 6.0%]), and patient experience (73.5% vs 74.8%; difference, 1.3% [95% CI, 0.6% to 1

  5. Managed care quality of care and plan choice in New York SCHIP.

    PubMed

    Liu, Hangsheng; Phelps, Charles E; Veazie, Peter J; Dick, Andrew W; Klein, Jonathan D; Shone, Laura P; Noyes, Katia; Szilagyi, Peter G

    2009-06-01

    To examine whether low-income parents of children enrolled in the New York State Children's Health Insurance Program (SCHIP) choose managed care plans with better quality of care. 2001 New York SCHIP evaluation data; 2001 New York State Managed Care Plan Performance Report; 2000 New York State Managed Care Enrollment Report. Each market was defined as a county. A final sample of 2,325 new enrollees was analyzed after excluding those in markets with only one SCHIP plan. Plan quality was measured using seven Consumer Assessment of Health Plans Survey (CAHPS) and three Health Plan Employer Data and Information Set (HEDIS) scores. A conditional logit model was applied with plan and individual/family characteristics as covariates. There were 30 plans in the 45 defined markets. The choice probability increased 2.5 percentage points for each unit increase in the average CAHPS score, and the association was significantly larger in children with special health care needs. However, HEDIS did not show any statistically significant association with plan choice. Low-income parents do choose managed care plans with higher CAHPS scores for their newly enrolled children, suggesting that overall quality could improve over time because of the dynamics of enrollment.

  6. Managed Care Quality of Care and Plan Choice in New York SCHIP

    PubMed Central

    Liu, Hangsheng; Phelps, Charles E; Veazie, Peter J; Dick, Andrew W; Klein, Jonathan D; Shone, Laura P; Noyes, Katia; Szilagyi, Peter G

    2009-01-01

    Objective To examine whether low-income parents of children enrolled in the New York State Children's Health Insurance Program (SCHIP) choose managed care plans with better quality of care. Data Sources 2001 New York SCHIP evaluation data; 2001 New York State Managed Care Plan Performance Report; 2000 New York State Managed Care Enrollment Report. Study Design Each market was defined as a county. A final sample of 2,325 new enrollees was analyzed after excluding those in markets with only one SCHIP plan. Plan quality was measured using seven Consumer Assessment of Health Plans Survey (CAHPS) and three Health Plan Employer Data and Information Set (HEDIS) scores. A conditional logit model was applied with plan and individual/family characteristics as covariates. Principle Findings There were 30 plans in the 45 defined markets. The choice probability increased 2.5 percentage points for each unit increase in the average CAHPS score, and the association was significantly larger in children with special health care needs. However, HEDIS did not show any statistically significant association with plan choice. Conclusions Low-income parents do choose managed care plans with higher CAHPS scores for their newly enrolled children, suggesting that overall quality could improve over time because of the dynamics of enrollment. PMID:19208091

  7. Transforming an EPA QA/R-2 quality management plan into an ISO 9002 quality management system.

    PubMed

    Kell, R A; Hedin, C M; Kassakhian, G H; Reynolds, E S

    2001-01-01

    The Environmental Protection Agency's (EPA) Office of Emergency and Remedial Response (OERR) requires environmental data of known quality to support Superfund hazardous waste site projects. The Quality Assurance Technical Support (QATS) Program is operated by Shaw Environmental and Infrastructure, Inc. to provide EPA's Analytical Operations Center (AOC) with performance evaluation samples, reference materials, on-site laboratory auditing capabilities, data audits (including electronic media data audits), methods development, and other support services. The new QATS contract awarded in November 2000 required that the QATS Program become ISO 9000 certified. In a first for an EPA contractor, the QATS staff and management successfully transformed EPA's QA/R-2 type Quality Management Plan into a Quality Management System (QMS) that complies with the requirements of the internationally recognized ISO 9002 standard and achieved certification in the United States, Canada, and throughout Europe. The presentation describes how quality system elements of ISO 9002 were implemented on an already existing quality system. The psychological and organizational challenges of the culture change in QATS' day-to-day operations will be discussed for the benefit of other ISO 9000 aspirants.

  8. 77 FR 12491 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... revisions to the Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air..., 2011, the submittal for Antelope Valley AQMD and SJVUAPCD Negative Declarations submitted on June...

  9. 77 FR 12527 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air...

  10. 77 FR 26448 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... approve revisions to the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air... rules were developed as part of the local agency's program to control these pollutants. Antelope...

  11. 78 FR 21545 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) and Monterey Bay Unified... developed as part of the local agency's program to control these pollutants. Antelope Valley AQMD Rule...

  12. 76 FR 50891 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA... sources, to achieve emissions reductions milestones, to attain and maintain ambient air quality...

  13. Double Shell Tanks (DST) and Waste Feed Delivery Project Management Quality Affecting Procedures Management Plan

    SciTech Connect

    LUND, D.P.

    2000-09-25

    The purpose of the Double Shell Tanks (DST) and Waste Feed Delivery (WFD) Management Assessment Plan is to define how management assessments within DST h WFD will be conducted. The plan as written currently includes only WFD Project assessment topics. Other DST and WFD group assessment topics will be added in future revisions.

  14. VERIFICATION TESTING OF AIR POLLUTION CONTROL TECHNOLOGY QUALITY MANAGEMENT PLAN

    EPA Science Inventory

    This document is the basis for quality assurance for the Air Pollution Control Technology Verification Center (APCT Center) operated under the U.S. Environmental Protection Agency (EPA). It describes the policies, organizational structure, responsibilities, procedures, and qualit...

  15. VERIFICATION TESTING OF AIR POLLUTION CONTROL TECHNOLOGY QUALITY MANAGEMENT PLAN

    EPA Science Inventory

    This document is the basis for quality assurance for the Air Pollution Control Technology Verification Center (APCT Center) operated under the U.S. Environmental Protection Agency (EPA). It describes the policies, organizational structure, responsibilities, procedures, and qualit...

  16. 77 FR 11992 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing a limited approval and limited disapproval of revisions to the Mojave Desert Air...

  17. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect

    Fix, N. J.

    2008-02-20

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  18. DCASR (Defense Contract Administration Services Region) Dallas Total Quality Management Implementation Plan

    DTIC Science & Technology

    1989-07-01

    N’L’ 89 10 6 00 4 Approved for pu~blic release(8 0 0"tIbut.°n Unh-te t. DCASR DALLAS TOTAL QUALITY MANAGEMENT IMPLEMENTATION PLAN OPI DATE 1...Apr 89 concept of "internal-external customers". input from all 10 . Secure outline of cross-training plan used K/CO Mar 89 at DISC and evaluate for...demanded of workers, management, and the overall organization in the new economic age. We have taken several steps to keep our costs low: a. Over half of

  19. Planning for Quality Data

    SciTech Connect

    Robert P. Evans

    2005-05-01

    The assurance of data quality can be a complex process requiring careful planning. The planning process described in this paper uses Data Quality Objectives as the foundation. The described process considers three steps: project requirement identification, definition of the information necessary to answer the questions, and data collection and management. Since sufficient levels of documentation are required at all levels, uncertainty analysis, traceability and custody, data maintenance, and data evaluation and review are also discussed.

  20. Planning For Quality Data

    SciTech Connect

    Robert P. Evans

    2005-05-01

    The assurance of data quality can be a complex process requiring careful planning. The planning process described in this paper uses Data Quality Objectives as the foundation. The described process considers three steps: project requirement identification, definition of the information necessary to answer the questions, and data collection and management. Since sufficient levels of documentation are required at all levels, uncertainty analysis, traceability and custody, data maintenance, and data evaluation and review are also discussed.

  1. LANDSAT supports data needs for EPA 208 planning. [water quality control and waste treatment management

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Excerpts from federal legislation and regulations mandating areawide waster treatment management as a means of restoring and maintaining the integrity of the nation's water are presented along with requirements for grants to the states for water quality planning, management, and implementation. Experiences using LANDSAT to identify nonpoint sources of water pollution as well as land/use/land cover features in South Dakota, Kentucky, Georgia, New Jersey, and Texas are described. Present activities suggest that this type of remote sensing is an efficient, effective tool for areawide water quality planning. Interaction with cognizant federal, state, and local government personnel involved in EPA section 208 planning activities can guide the development of new capabilities and enhance their utility and prospect for use.

  2. Sustainable water quality management framework and a strategy planning system for a river basin.

    PubMed

    Chen, Ching-Ho; Liu, Wei-Lin; Leu, Horng-Guang

    2006-12-01

    In Taiwan, the authorities have spent years working on remedying polluted rivers. Generally, the remediation planning works are divided into two phases. During the first phase, the allowed pollution discharge quantity and abatement quantity of each drainage zone, including the assimilative capacity, are generated based on the total river basin. In the second phase, the abatement action plans for each pollution source in each drainage zone are respectively devised by the related organizations based on the strategies generated during the first phase. However, the effectiveness of linking the two phases is usually poor. Highly integrated performances are not always achieved because the separate two-phase method does not take system and management thinking into consideration in the planning stage. This study pioneers the use of the Managing for Results (MFR) method in planning strategies and action plans for river water quality management. A sustainable management framework is proposed based on the concept and method of MFR, Management Thinking, and System Analysis. The framework, consisting of planning, implementation, and controlling stages, systematically considers the relationships and interactions among four factors: environment, society, economy, and institution, based on the principles of sustainable development. Based on the framework, the Modified Bounded Implicit Enumeration algorithm, which is used as a solving method, is combined with Visual Basic software and MS Excel to develop a computer system for strategy planning. The Shetzu River, located in northern Taiwan, is applied as a case study. According to the theoretical, practical, and regulatory considerations, the result-oriented objectives are defined to first improve the pollution length of the Shetzu River in specific remediation periods to finally meet regulated water quality standards. The objectives are then addressed as some of the constraints for the strategy planning model. The model objective

  3. 34 CFR 611.2 - What management plan must be included in a Teacher Quality Enhancement Grants Program application?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... TEACHER QUALITY ENHANCEMENT GRANTS PROGRAM General Provisions § 611.2 What management plan must be... 34 Education 3 2011-07-01 2011-07-01 false What management plan must be included in a Teacher Quality Enhancement Grants Program application? 611.2 Section 611.2 Education Regulations of the Offices...

  4. 34 CFR 611.2 - What management plan must be included in a Teacher Quality Enhancement Grants Program application?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... TEACHER QUALITY ENHANCEMENT GRANTS PROGRAM General Provisions § 611.2 What management plan must be... 34 Education 3 2013-07-01 2013-07-01 false What management plan must be included in a Teacher Quality Enhancement Grants Program application? 611.2 Section 611.2 Education Regulations of the...

  5. 34 CFR 611.2 - What management plan must be included in a Teacher Quality Enhancement Grants Program application?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... TEACHER QUALITY ENHANCEMENT GRANTS PROGRAM General Provisions § 611.2 What management plan must be... 34 Education 3 2014-07-01 2014-07-01 false What management plan must be included in a Teacher Quality Enhancement Grants Program application? 611.2 Section 611.2 Education Regulations of the...

  6. 34 CFR 611.2 - What management plan must be included in a Teacher Quality Enhancement Grants Program application?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... TEACHER QUALITY ENHANCEMENT GRANTS PROGRAM General Provisions § 611.2 What management plan must be... 34 Education 3 2012-07-01 2012-07-01 false What management plan must be included in a Teacher Quality Enhancement Grants Program application? 611.2 Section 611.2 Education Regulations of the...

  7. 34 CFR 611.2 - What management plan must be included in a Teacher Quality Enhancement Grants Program application?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TEACHER QUALITY ENHANCEMENT GRANTS PROGRAM General Provisions § 611.2 What management plan must be... 34 Education 3 2010-07-01 2010-07-01 false What management plan must be included in a Teacher Quality Enhancement Grants Program application? 611.2 Section 611.2 Education Regulations of the...

  8. Parking and routing information system phase 1 evaluation -- Data management and quality control/quality assurance plans

    SciTech Connect

    Carter, R.J.

    1997-01-01

    A parking and routing information system (PARIS) is being designed and deployed at a test site on the Mountain Home Veterans Administration campus in Johnson City, Tennessee using three sensor technologies. The purpose of the PARIS project is to demonstrate innovative integration of vehicle sensing technologies with parking management strategies to improve mobility and relieve congestion associated with a growing medical technology complex. Oak Ridge National Laboratory`s (ORNL) role during phase 1 of the project is to act as the independent evaluator. This technical memorandum presents two plans, Data Management Plan and Quality Control/Quality Assurance (QC/QA) Plan, which were developed to support ORNL`s responsibilities and functions. The purposes of the Data Management Plan are to coordinate the data needs which will be addressed in four individual evaluation test plans and to deal with the data issues facing the phase 1 evaluation as a whole. The objectives of the QC/QA Plan are to ensure that the evaluation is conducted properly, to guarantee that the data which will be collected are valid and properly analyzed, and to make sure that the test results are accurately recorded and reported. The evaluation will be performed through the execution of four integrated studies (system performance, user acceptance, institutional and business issues, and transportation systems). The phase 1 evaluation data will be collected from 24 sources. Three databases will be established based upon these data (project team database, distributed database processor, and evaluator database).

  9. Project Hanford management contract quality assurance program implementation plan for nuclear facilities

    SciTech Connect

    Bibb, E.K.

    1997-10-15

    During transition from the Westinghouse Hanford Company (WHC) Management and Operations (M and O) contract to the Fluor Daniel Hanford (FDH) Management and Integration (M and I) contract, existing WHC policies, procedures, and manuals were reviewed to determine which to adopt on an interim basis. Both WHC-SP-1131,Hanford Quality Assurance Program and Implementation Plan, and WHC-CM-4-2, Quality Assurance Manual, were adopted; however, it was recognized that revisions were required to address the functions and responsibilities of the Project Hanford Management Contract (PHMC). This Quality Assurance Program Implementation Plan for Nuclear Facilities (HNF-SP-1228) supersedes the implementation portion of WHC-SP-1 13 1, Rev. 1. The revised Quality Assurance (QA) Program is documented in the Project Hanford Quality Assurance Program Description (QAPD), HNF-MP-599. That document replaces the QA Program in WHC-SP-1131, Rev. 1. The scope of this document is limited to documenting the nuclear facilities managed by FDH and its Major Subcontractors (MSCS) and the status of the implementation of 10 CFR 830.120, Quality Assurance Requirements, at those facilities. Since the QA Program for the nuclear facilities is now documented in the QAPD, future updates of the information provided in this plan will be by letter. The layout of this plan is similar to that of WHC-SP-1 13 1, Rev. 1. Sections 2.0 and 3.0 provide an overview of the Project Hanford QA Program. A list of Project Hanford nuclear facilities is provided in Section 4.0. Section 5.0 provides the status of facility compliance to 10 CFR 830.120. Sections 6.0, 7.0, and 8.0 provide requested exemptions, status of open items, and references, respectively. The four appendices correspond to the four projects that comprise Project Hanford.

  10. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect

    Fix, N. J.

    2009-04-03

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

  11. Fuels planning: science synthesis and integration; social issues fact sheet 13: Strategies for managing fuels and visual quality

    Treesearch

    Christine Esposito

    2006-01-01

    The public's acceptance of forest management practices, including fuels reduction, is heavily based on how forests look. Fuels managers can improve their chances of success by considering aesthetics when making management decisions. This fact sheet reviews a three-part general strategy for managing fuels and visual quality: planning, implementation, and monitoring...

  12. Nurse care manager contribution to quality of care in a dual-eligible special needs plan.

    PubMed

    Roth, Carol P; Ganz, David A; Nickles, Lorraine; Martin, David; Beckman, Robin; Wenger, Neil S

    2012-07-01

    We evaluated the quality of care provided to older patients with complex needs in a dual-eligible, community-based Medicare Special Needs Plan that used a nurse care manager model. Care provided by physicians was substantially supplemented by nurse care managers, as measured by Assessing Care of Vulnerable Elders quality indicators. We describe selected nurse care manager activities for six geriatric conditions (falls, dementia, depression, nutrition, urinary incontinence, and end-of-life care) during provision of patient care coordination and management for patients in the highest decile of clinical complexity. We identify areas of high nurse performance (i.e., falls screening, functional assessment, behavioral interventions for dementia problems, advance care planning) and areas of potential missed opportunities (i.e., follow up for new memory problems, targeted dementia counseling, nutrition, and behavioral approaches to urinary incontinence). Increasing the collaborative interaction between nurses providing care in this model and physicians has the potential to enhance nurses' contributions to primary care for vulnerable older adults.

  13. 77 FR 23133 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ... taking direct final action to approve revisions to the Yolo-Solano Air Quality Management District (Yolo.... * * * * * (381) * * * (i) * * * (I) Yolo-Solano Air Quality Management District. (1) Rule 2.3, ``Ringelmann Chart... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air...

  14. 75 FR 19923 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Yolo-Solano Air Quality Management District (YSAQMD) portion of...

  15. 77 FR 23193 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Yolo-Solano Air Quality Management District portion of the...

  16. Risk-based water resources planning: Coupling water allocation and water quality management under extreme droughts

    NASA Astrophysics Data System (ADS)

    Mortazavi-Naeini, M.; Bussi, G.; Hall, J. W.; Whitehead, P. G.

    2016-12-01

    The main aim of water companies is to have a reliable and safe water supply system. To fulfil their duty the water companies have to consider both water quality and quantity issues and challenges. Climate change and population growth will have an impact on water resources both in terms of available water and river water quality. Traditionally, a distinct separation between water quality and abstraction has existed. However, water quality can be a bottleneck in a system since water treatment works can only treat water if it meets certain standards. For instance, high turbidity and large phytoplankton content can increase sharply the cost of treatment or even make river water unfit for human consumption purposes. It is vital for water companies to be able to characterise the quantity and quality of water under extreme weather events and to consider the occurrence of eventual periods when water abstraction has to cease due to water quality constraints. This will give them opportunity to decide on water resource planning and potential changes to reduce the system failure risk. We present a risk-based approach for incorporating extreme events, based on future climate change scenarios from a large ensemble of climate model realisations, into integrated water resources model through combined use of water allocation (WATHNET) and water quality (INCA) models. The annual frequency of imposed restrictions on demand is considered as measure of reliability. We tested our approach on Thames region, in the UK, with 100 extreme events. The results show increase in frequency of imposed restrictions when water quality constraints were considered. This indicates importance of considering water quality issues in drought management plans.

  17. A theoretical framework for the episodic-urban air quality management plan ( e-UAQMP)

    NASA Astrophysics Data System (ADS)

    Gokhale, Sharad; Khare, Mukesh

    The present research proposes the local urban air quality management plan which combines two different modelling approaches (hybrid model) and possesses an improved predictive ability including the 'probabilistic exceedances over norms' and their 'frequency of occurrences' and so termed, herein, as episodic-urban air quality management plan ( e-UAQMP). The e-UAQMP deals with the consequences of 'extreme' concentrations of pollutant, mainly occurring at urban 'hotspots' e.g. traffic junctions, intersections and signalized roadways and are also influenced by complexities of traffic generated 'wake' effects. The e-UAQMP (based on probabilistic approach), also acts as an efficient preventive measure to predict the 'probability of exceedances' so as to prepare a successful policy responses in relation to the protection of urban environment as well as disseminating information to its sensitive 'receptors'. The e-UAQMP may be tailored to the requirements of the local area for the policy implementation programmes. The importance of such policy-making framework in the context of current air pollution 'episodes' in urban environments is discussed. The hybrid model that is based on both deterministic and stochastic based approaches predicting the 'average' as well as 'extreme' concentration distribution of air pollutants together in form of probability has been used at two air quality control regions (AQCRs) in the Delhi city, India, in formulating and executing the e-UAQMP— first, the income tax office (ITO), one of the busiest signalized traffic intersection and second, the Sirifort, one of the busiest signalized roadways.

  18. 78 FR 25011 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ... Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management District and Ventura County Air Pollution Control District AGENCY: Environmental Protection Agency (EPA... Management District (AVAQMD), Santa Barbara County Air Pollution Control District (SBCAPCD), South Coast...

  19. Quality-assurance and data management plan for groundwater activities by the U.S. Geological Survey in Kansas, 2014

    USGS Publications Warehouse

    Putnam, James E.; Hansen, Cristi V.

    2014-01-01

    As the Nation’s principle earth-science information agency, the U.S. Geological Survey (USGS) is depended on to collect data of the highest quality. This document is a quality-assurance plan for groundwater activities (GWQAP) of the Kansas Water Science Center. The purpose of this GWQAP is to establish a minimum set of guidelines and practices to be used by the Kansas Water Science Center to ensure quality in groundwater activities. Included within these practices are the assignment of responsibilities for implementing quality-assurance activities in the Kansas Water Science Center and establishment of review procedures needed to ensure the technical quality and reliability of the groundwater products. In addition, this GWQAP is intended to complement quality-assurance plans for surface-water and water-quality activities and similar plans for the Kansas Water Science Center and general project activities throughout the USGS. This document provides the framework for collecting, analyzing, and reporting groundwater data that are quality assured and quality controlled. This GWQAP presents policies directing the collection, processing, analysis, storage, review, and publication of groundwater data. In addition, policies related to organizational responsibilities, training, project planning, and safety are presented. These policies and practices pertain to all groundwater activities conducted by the Kansas Water Science Center, including data-collection programs, interpretive and research projects. This report also includes the data management plan that describes the progression of data management from data collection to archiving and publication.

  20. Assessment of a Megacity Air Quality Management Policy using the GAINS-Korea : Seoul metropolitan area Air Quality Management Plan(SAQMP)

    NASA Astrophysics Data System (ADS)

    Kim, Y.; Woo, J. H.; Ahn, Y. H.; Choi, K. C.; Kim, H. K.; Lee, Y. M.; Amann, M.; Wagner, F.; Lee, J. B.; Song, C. K.; Han, J. S.

    2014-12-01

    Air pollution in and near megacities are very severe because of their massive pollutant emissions and high population density. Korea has ambitiously set its 2nd phase capitol air quality improvement program called Seoul metropolitan area Air Quality Management Plan(SAQMP), targeting the year 2024. The air quality improvement targets for the year 2024 are 30 ug/m3 and 20 ug/m3 for PM10 and pm2.5, respectively and planned expenditure are almost 4 billion US dollar. Emissions of PM10, PM2.5 are required to be decreased up to 35%, 45%, respectively, from their future baseline level. Various special measures, such as cap-and-trade, LNB, EURO standards program, will be implemented to control emissions over Seoul, Incheon, and Gyeonggi-do area. Smart approach of reducing air pollution and GHGs are, however, required to maximize improvement of metropolitan air quality and climate change. IIASA's Greenhouse gas - Air pollution Interactions aNd Synergies(GAINS) modeling framework is an widely used tool to design and manage smart emission control strategies that can achieve air quality/climate improvements with least costs. We have developed the national version of GAINS for Korea (GAINS-Korea) to set up those strategies for national and regional scale. In this study, we have implemented SAQMP in the GAINS-Korea Model and assess its effects of emissions reduction and air quality improvements. Various analysis results using the framework will be presented at site.

  1. Groundwater quality assessment plan for the Metallurgical Laboratory Hazardous Waste Management Facility

    SciTech Connect

    Jerome, K.M.

    1990-10-01

    The Metallurgical Laboratory Hazardous Waste Management Facility (MLHWMF) will be closed under interim status regulation and permitted as a hazardous waste management facility by a Post Closure Part B Permit under 40 CFR 264. This report discusses the ground water quality assessment plan for the MLHWMF. The Metallurgical Laboratory Hazardous Waste Management Facility consists of the process sewer line leading to the Metallurgical Laboratory basin from the fence, the Metallurgical Laboratory basin, the drainage outfall to the Carolina bay, and the Carolina bay itself. The Metallurgical Laboratory HWMF received F001, F003, F007, and D011 waste. F001 waste includes spent halogenated solvents used in degreasing (trichloroethylene, 1,1,1-trichloroethane, and carbon tetrachloride). F003 waste includes spent nonhalogenated solvents (acetone), and F007 waste is spent cyanide plating bath solution. At present forty-three constituents are analyzed per sample. Trichloroethylene, tetrachloroethylene, and total radium are the only constituents that were reported above Primary Drinking Water Standards (PDWS) during the second quarter of 1990. Listed in this report are the constituents that are being analyzed at present. Appendix A presents the trends for the analyzed constituents from the fourth quarter of 1988 to the second quarter of 1990. 5 figs., 5 tabs.

  2. 77 FR 52277 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-29

    ... Management District; Prevention of Significant Deterioration; Greenhouse Gases AGENCY: Environmental... Greenhouse Gases, into the SIP to establish a PSD permit program for pre-construction review of certain new and modified major stationary sources that emit or may emit greenhouse gases (GHGs). Because the State...

  3. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-10

    ... Management District; Prevention of Significant Deterioration; Greenhouse Gases AGENCY: Environmental... Greenhouse Gases into the California SIP. The submitted revision is a permitting rule that contains the... sources of greenhouse gases (GHGs) as required by Part C of title I of the Clean Air Act. In addition...

  4. Multi-Pollutant Planning and Control Strategies for Air Quality Management

    EPA Pesticide Factsheets

    Describes how planning controls for multiple pollutants at the same time can save money and time and achieve significant benefits, and how control strategies can address both climate change and air quality.

  5. Quality assurance project plan for ground water monitoring activities managed by Westinghouse Hanford Company. Revision 3

    SciTech Connect

    Stauffer, M.

    1995-11-01

    This quality assurance project plan (QAPP) applies specifically to the field activities and laboratory analysis performed for all RCRA groundwater projects conducted by Hanford Technical Services. This QAPP is generic in approach and shall be implemented in conjunction with the specific requirements of individual groundwater monitoring plans.

  6. Air Quality Implementation Plans

    EPA Pesticide Factsheets

    States must develop plans to attain and maintain air quality standards. These plans, known as SIPs, are submitted to EPA for approval. This web site contains information about this process and the current status of the submittals.

  7. Quality Assurance Project Plan

    SciTech Connect

    Holland, R. C.

    1998-06-01

    This Quality Assurance Project Plan documents the quality assurance activities for the Wastewater/Stormwater/Groundwater and Environmental Surveillance Programs. This QAPP was prepared in accordance with DOE guidance on compliance with 10CFR830.120.

  8. Does human resource management improve family planning service quality? Analysis from the Kenya Service Provision Assessment 2010.

    PubMed

    Thatte, Nandita; Choi, Yoonjoung

    2015-04-01

    Human resource (HR) management is a priority for health systems strengthening in developing countries, yet few studies have empirically examined associations with service quality. The purpose of this study was to assess the relationship between HR management and family planning (FP) service quality. Data came from the 2010 Kenya Service Provision Assessment, a nationally representative health facility assessment. In total, 912 FP consultations from 301 facilities were analysed. Four indices were created to measure quality on reproductive history taking, physical examination, sexually transmitted infections prevention and pill/injectable specific counselling. HR management variables included training in the past year, any and supportive (i.e. with feedback, technical updates and discussion) in-person supervision in the past 6 months and having a written job description. Multivariate linear regression analyses were conducted to estimate coefficients of HR management variables on each of the four quality indices, adjusting for background characteristics of clients, provider and facilities. The level of service quality ranged from 16 to 53 out of a maximum score of 100 across the indices. Fifty-two per cent of consultations were done by providers who received supportive in-person supervision in the previous 6 months. In 23% and 38% of consultations, the provider was trained in the past year and had a written job description, respectively. Multivariate analyses indicated that having a written job description was associated with higher service quality in history taking, physical examination and the pill/injectable specific counselling. Other HR management variables were not significantly associated with service quality. Having a written job description was significantly associated with higher service quality and may be a useful tool for strengthening management practices. The details of such job descriptions and the quality of other management indicators should be

  9. Sacramento Metropolitan Air Quality Management District; Approval of California Air Plan Revisions

    EPA Pesticide Factsheets

    EPA is proposing to approve a revision to the Sacramento Metropolitan Air Quality Management District portion of the CA SIP concerning emissions of volatile organic compounds (VOC) from organic chemical manufacturing operations.

  10. Sacramento Metropolitan Air Quality Management District; Approval of California Air Plan Revisions

    EPA Pesticide Factsheets

    EPA is proposing to approve a revision to the Sacramento Metropolitan Air Quality Management District portion of the CA SIP concerning emissions of volatile organic compounds (VOC) from landfill gas flaring at the Kiefer Landfill in Sacramento, CA.

  11. The development of a statewide continuous evaluation system for the Texas Children's Mental Health Plan: a total quality management approach.

    PubMed

    Rouse, L W; Toprac, M G; MacCabe, N A

    1998-05-01

    The article presents a description of processes involved in developing and implementing a statewide continuous evaluation system for the Texas Children's Mental Health Plan (TCMHP) and quality management tools used to approach implementation challenges. Implementation issues are discussed relating to stakeholder involvement, evaluation design evolution, measurement method modification, evaluation integration, staff training, data quality control, communication of results, and use of results in decision making. A review of implementation processes suggests evaluation design and activities should be seen as constantly evolving in response to ongoing stakeholder input. Involving stakeholders in design and implementation can result in increased data quality, data-informed decision making to improve service delivery, and increased public accountability. The TCMHP evaluation system development demonstrates that quality management tools can provide a useful framework to work through design and implementation problems, and a continuous evaluation system can provide an infrastructure for meeting data needs in a managed care environment.

  12. NATIONAL EXPOSURE RESEARCH LABORATORY (NERL) INTEGRATED INFORMATOIN AND QUALITY MANAGEMENT PLAN TRAINING

    EPA Science Inventory

    The success of the NERL quality system relies on participation by all managers and staff. This training was developed for the purpose of communicating the basic features of the quality system in a convenient and efficient manner. The total time to complete a review of all five ...

  13. NATIONAL EXPOSURE RESEARCH LABORATORY (NERL) INTEGRATED INFORMATOIN AND QUALITY MANAGEMENT PLAN TRAINING

    EPA Science Inventory

    The success of the NERL quality system relies on participation by all managers and staff. This training was developed for the purpose of communicating the basic features of the quality system in a convenient and efficient manner. The total time to complete a review of all five ...

  14. 78 FR 58459 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ...) * * * (i) * * * (E) Ventura County Air Pollution Control District. (1) Rule 74.18, ``Motor Vehicle and... Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management District and Ventura County Air Pollution Control District AGENCY: Environmental Protection Agency (EPA...

  15. Error budgets for quality management--practical tools for planning and assuring the analytical quality of laboratory testing processes.

    PubMed

    Westgard, J O

    1996-01-01

    Analytical quality is often assumed, rather than being assured or guaranteed. Given that it is still essential that laboratories produce reliable test results, managers must continue to improve their skills in analytical quality management. This paper shows managers how to use error budgets and charts of operating specifications (¿OPSpecs¿ charts) to select appropriate control rules and numbers of control measurements, taking into account the analytical or clinical quality required for a test and the imprecision and inaccuracy observed for a method. With currently available tools and a little practice, quality control (QC) procedures can be selected quickly and easily, in just 1 minute or less. Future technology is expected to automate the QC selection process and provide dynamic quality control.

  16. 77 FR 2496 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the...

  17. Specific application for Oak Ridge National Laboratory dismantlement of Building 3004. Appendix A -- Quality assurance plan; Appendix B -- Records management plan

    SciTech Connect

    1997-03-01

    This quality assurance (QA) plan defines the QA requirements for the dismantlement and removal of Building 3004 at Oak Ridge National Laboratory (ORNL). The building is a four-story wooden trained structure with wooden siding, which resides approximately 150 ft west of the Bulk Shielding Reactor, and only several feet away from the visitors entrance to the Graphite Reactor museum. Complete descriptions and sketches are in the Performance Specification document for this project. This project is being conducted as a non-CERCLA maintenance action. This plan is an appendix to the QA plan for the ORNL Environmental Restoration (ER) Program. ORNL/ER-225, which is the source of the project QA requirements, tailors those QA requirements to the specific needs of this project as defined in ORNL/ER-225. Project-specific description and organization are also provided in this plan. Appendix B, Records Management Plan, is included.

  18. DMPTool: New Guidance, Resources, and Outreach for Quality Data Management Plans

    NASA Astrophysics Data System (ADS)

    Cruse, P.; Sallans, A.

    2013-12-01

    A growing number of US federal funding agencies require data management plans (DMP) as part of new research grant proposals. To help researchers with this requirement, several organizations (the California Digital Library, University of Illinois, University of Virginia, Smithsonian Institution, the DataONE consortium and the (UK) Digital Curation Centre) came together to develop the DMPTool in 2011. The goal of the DMPTool is to provide researchers with guidance, links to resources and help with writing data management plans. Thanks to a grant from the Alfred P. Sloan Foundation, these organizations have been able to develop DMPTool2, adding new features and functionality, while aiming to grow the number of users and funding requirements and build a community around DMP best practices. Researchers create plans in the tool by selecting their desired funding agency. The tool provides specific requirements from the selected agency as well as detailed help with each area of the plan. Users have access to complete DMP life cycle management, tracking changes through creation, editing, submission, evaluation, and publication. They may also perform enhanced keyword searches and view publicly available plans. With role-based user authorization, users may hold various roles within the interface: creators, collaborators, institutional administrators, and tool administrators. Furthermore, partner institutions can add significant value to the process with several special tool features. Along with institutional branding in the interface, they can provide links to resources they provide to users, such as to preservation repositories, consultation services, or news and event items. In addition, partner institutions can provide help with specific plan questions, and even suggest responses. Institutional administrators can also mine data on plans in order to better support researchers. Institutions may be represented in different roles: as a funder, a researcher's affiliate, or as

  19. Energy Management Plan.

    ERIC Educational Resources Information Center

    Tasmania Dept. of Education, Hobart (Australia). Facilities Services Section.

    This report presents an overview of the energy management plan for Tasmanian schools designed to minimize the costs of all forms of energy usage within these facilities. The policy and objectives of the plan are provided along with details of the plan itself and its current status. Appendices contain an extract from Asset Management Plan for Real…

  20. Total quality management applications for Hanford`s five-year plan and public outreach

    SciTech Connect

    Peterson, J.M.

    1993-12-31

    The US Department of Energy has encountered problems and experienced successes and failures in the cleanup of the Hanford Site in Washington State. This paper focuses on (1) internal problems involved in managing this large and complex cleanup; (2) attempts at overcoming these problems; (3) problems and attempts at solutions in describing cleanup activities to the public and other government entities. It describes the Total Quality Management (TQM) approaches used in trying to solve these problems.

  1. The World Health Organization's water safety plan is much more than just an integrated drinking water quality management plan.

    PubMed

    Viljoen, F C

    2010-01-01

    South Africa is a country of contrasts with far ranging variations in climate, precipitation rates, cultures, demographics, housing levels, education, wealth and skills levels. These differences have an impact on water services delivery as do expectations, affordability and available resources. Although South Africa has made much progress in supplying drinking water, the same cannot be said regarding water quality throughout the country. A concerted effort is currently underway to correct this situation and as part of this drive, water safety plans (WSP) are promoted. Rand Water, the largest water services provider in South Africa, used the World Health Organization (WHO) WSP framework as a guide for the development of its own WSP which was implemented in 2003. Through the process of implementation, Rand Water found the WHO WSP to be much more than just another integrated quality system.

  2. Techniques for managing quality.

    PubMed

    Plsek, P E

    1995-01-01

    The science of quality management is an eclectic collection of concepts and methods primarily borrowed from other fields. Techniques roughly fall into three categories involving quality improvement, planning, and measurement. Improvement techniques include models to guide team-based efforts, tools for process description, and tools for data analysis. These methods are the most visible artifacts of CQI efforts in health care organizations today. Less widely known, but equally powerful, are the techniques of quality planning. There are models to guide both process design and strategic planning, methods for identifying customer needs, and tools to support these efforts. Finally, while measurement is a traditionally well-developed area in health care, industrial quality management science broadens our outlook about what is important to measure. It also provides the technique of benchmarking, which suggests that we look beyond our own organization when we measure performance.

  3. 77 FR 39181 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ... in the Federal Register on February 28, 2012 and concern glass furnaces and biomass boilers. We are... Adopted Submitted MDAQMD 1165 Glass Melting Furnaces......... 08/12/08 12/23/08 YSAQMD 2.43 Biomass...) * * * (F) Yolo-Solano Air Quality Management District. (1) Rule 2.43, ``Biomass Boilers,'' adopted on...

  4. Environmental Technology Verification Program Quality Management Plan, Version 3.0

    EPA Science Inventory

    The ETV QMP is a document that addresses specific policies and procedures that have been established for managing quality-related activities in the ETV program. It is the “blueprint” that defines an organization’s QA policies and procedures; the criteria for and areas of QA appli...

  5. Two-stage planning for sustainable water-quality management under uncertainty.

    PubMed

    Li, Y P; Huang, G H

    2009-06-01

    In water-quality management problems, uncertainties may exist in a number of impact factors and pollution-related processes (e.g., the volume and strength of industrial wastewater and their variations can be presented as random events through identifying a statistical distribution for each source); moreover, nonlinear relationships may exist among many system components (e.g., cost parameters may be functions of wastewater-discharge levels). In this study, an inexact two-stage stochastic quadratic programming (ITQP) method is developed for water-quality management under uncertainty. It is a hybrid of inexact quadratic programming (IQP) and two-stage stochastic programming (TSP) methods. The developed ITQP can handle not only uncertainties expressed as probability distributions and interval values but also nonlinearities in the objective function. It can be used for analyzing various scenarios that are associated with different levels of economic penalties or opportunity losses caused by improper policies. The ITQP is applied to a case of water-quality management to deal with uncertainties presented in terms of probabilities and intervals and to reflect dynamic interactions between pollutant loading and water quality. Interactive and derivative algorithms are employed for solving the ITQP model. The solutions are presented as combinations of deterministic, interval and distributional information, and can thus facilitate communications for different forms of uncertainties. They are helpful for managers in not only making decisions regarding wastewater discharge but also gaining insight into the tradeoff between the system benefit and the environmental requirement.

  6. 77 FR 12493 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... internal combustion engines. Under authority of the Clean Air Act as amended in 1990 (CAA or the Act), this... FRAQMD 3.22 \\1\\ Internal Combustion 06/01/09 01/10/10 Engines. \\1\\ In some sections of the published... River Air Quality Management District. (1) Rule 3.22, ``Internal Combustion Engines,'' adopted on...

  7. Environmental Technology Verification Program Quality Management Plan, Version 3.0

    EPA Science Inventory

    The ETV QMP is a document that addresses specific policies and procedures that have been established for managing quality-related activities in the ETV program. It is the “blueprint” that defines an organization’s QA policies and procedures; the criteria for and areas of QA appli...

  8. Safety and quality management and administration Fiscal Year 1995 site support program plan WBS 6.7.2.6

    SciTech Connect

    Hagan, J.W.

    1994-09-01

    The mission of the Emergency, Safety, and Quality Services (ESQ) management and Program Integration is to provide leadership for the ESQ Department, coordinate business management activities of the ESQ department, and the programs it supports, as well as to plan organize, direct, and control other activities that require department-wide coordination. Primary activities include providing strategic and business planning and reporting support to ESQ management; developing and documenting ESQ management systems and procedures; coordinating ESQ`s self-assessment and Award Fee self evaluation efforts; coordinating the ESQ departments`s communication, total quality, cost savings, and productivity efforts; and tracking ESQ commitments and staffing data. This program element also provides program direction and performance assessment for the ESH&Q division of ICF KH. The ESH&Q Division educates ICF KH management and employees to protect personnel and the environment; identifies, interprets and inspects to requirements; provides administrative and field support; performs final acceptance of construction; assesses effectiveness of ICF KH programs and processes, and performs baseline ESH&Q assessments.

  9. Energy planning and management plan

    SciTech Connect

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

  10. Business Continuity Management Plan

    DTIC Science & Technology

    2014-12-01

    13 B. BUSINESS IMPACT ANALYSIS ................................................................17 C. RECOVERY STRATEGY...Business Continuity Institute BCM business continuity management BCP business continuity plan BIA business impact analysis... environmental , health and safety ERP Enterprise Resource Planning FEMA Federal Emergency Management Agency FISMA Federal Information Security Management

  11. DCASR (Defense Contract Administration Services Region) Atlanta Total Quality Management (TQM) Strategic Plan

    DTIC Science & Technology

    1989-07-01

    k DCN-- A, ApDl9ve f;T pun li ’ rele,’d 89 10 6 007 Form Approved REPORT DOCUMENTATION PAGE oM No. 070-01o Public regorting burden or this cotlec-’tia...AGENCY NAME(S) AN6 AODRESS(ES) 10 . SPONSORING/ MONITORING AGENCY REPORT NUMBER 11. SUPPLEMENTARY NOTES 12a. DISTRIBUTION/ AVAILABILITY STATEMENT 12b...include a "Team Approach Model s’ and "Process Improve- ment Model." 0 89 10 6 007 14. SUBJECT TERMS 15. NUMBER OF PAGES TQ, (Total Quality Management

  12. Design of Cycle 3 of the National Water-Quality Assessment Program, 2013-23: Part 2: Science plan for improved water-quality information and management

    USGS Publications Warehouse

    Rowe, Gary L.; Belitz, Kenneth; Demas, Charlie R.; Essaid, Hedeff I.; Gilliom, Robert J.; Hamilton, Pixie A.; Hoos, Anne B.; Lee, Casey J.; Munn, Mark D.; Wolock, David W.

    2013-01-01

    This report presents a science strategy for the third decade of the National Water-Quality Assessment (NAWQA) Program, which since 1991, has been responsible for providing nationally consistent information on the quality of the Nation's streams and groundwater; how water quality is changing over time; and the major natural and human factors that affect current water quality conditions and trends. The strategy is based on an extensive evaluation of the accomplishments of NAWQA over its first two decades, the current status of water-quality monitoring activities by USGS and its partners, and an updated analysis of stakeholder priorities. The plan is designed to address priority issues and national needs identified by NAWQA stakeholders and the National Research Council (2012) irrespective of budget constraints. This plan describes four major goals for the third decade (Cycle 3), the approaches for monitoring, modeling, and scientific studies, key partnerships required to achieve these goals, and products and outcomes that will result from planned assessment activities. The science plan for 2013–2023 is a comprehensive approach to meet stakeholder priorities for: (1) rebuilding NAWQA monitoring networks for streams, rivers, and groundwater, and (2) upgrading models used to extrapolate and forecast changes in water-quality and stream ecosystem condition in response to changing climate and land use. The Cycle 3 plan continues approaches that have been central to the Program’s long-term success, but adjusts monitoring intensities and study designs to address critical information needs and identified data gaps. Restoration of diminished monitoring networks and new directions in modeling and interpretative studies address growing and evolving public and stakeholder needs for water-quality information and improved management, particularly in the face of increasing challenges related to population growth, increasing demands for water, and changing land use and climate

  13. Natural Resource Management Plan

    SciTech Connect

    Green, T.; Schwager, K.

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  14. The Relationship of Land Use and Transportation Planning to Air Quality Management.

    ERIC Educational Resources Information Center

    Hagevik, George, Ed.

    Due to a lack of communication between urban, regional, and transportation planning agencies and air pollution control agencies, cooperative efforts in environmental planning have been nearly non-existent. This traditional lack of communication and understanding serves to obscure the fact that air pollution control agencies and planning agencies…

  15. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    SciTech Connect

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs.

  16. Wilderness fire management planning guide

    Treesearch

    William C. Fischer

    1984-01-01

    Outlines a procedure for fire management planning for parks; wilderness areas; and other wild, natural, or essentially undeveloped areas. Discusses background and philosophy of wilderness fire management, planning concepts, planning elements, and planning methods.

  17. Groundwater Quality Assessment Plan for Single-Shell Tank Waste Management Area U

    SciTech Connect

    Smith, Ronald M.; Hodges, Floyd N.; Williams, Barbara A.

    2001-08-29

    Single-Shell Tank Waste Management Area U (WMA U) is in the 200 West Area on the Hanford Site. The area includes the U Tank Farm that contains 16 underground, single-shell tanks and their ancillary equipment and waste systems. WMA U is regulated under the Resource Conservation and Recovery Act of 1976 (RCRA) as codified in 40 CFR Part 265, Subpart F and Washington's Hazardous Waste Management Act (HWMA, RCW 70.105) and its implementing requirements in the Washington State dangerous waste regulations (WAC 173-303-400). Releases of hazardous wastes from WMA U have contaminated groundwater beneath the area. Therefore, the WMA U is being assessed to determine the rate of movement and extent of the contamination released and to determine the concentrations in groundwater. The original finding of groundwater impact was determined from elevated specific conductance in downgradient well 299-W19-41. The elevated specific conductance was attributed to the nonhazardous constituents calcium, magnesium, sulfate, and chloride. Tank waste constituents nitrate and technetium-99 are also present as co-contaminants and have increased over the past several years; however, at concentrations well below the respective drinking water standards. Chromium concentrations in downgradient wells have generally exceeded background levels, but similar levels were also observed in upgradient well 299-W18-25 in early 2000 before it went dry. The objective of this report is to present the current conceptual model for how and where contaminant releases have reached the water table and how that contamination has dispersed in the groundwater system. These efforts will achieve the requirements of a groundwater quality assessment under RCRA [40 CFR 265.93 (d)(4)]. On that basis, a monitoring schedule with appropriate analytes and proposals for new wells and tests are presented in this document.

  18. KCBX Quality Assurance Project Plan - October 2014

    EPA Pesticide Factsheets

    This revised plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring by URS Corporation at the KCBX Terminals Company North and South Terminals in Chicago, Ill.

  19. KCBX Quality Assurance Project Plan - February 2014

    EPA Pesticide Factsheets

    This plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring, by URS Corporation, at the KCBX Terminals Company North and South Terminals in Chicago, IL.

  20. 77 FR 32483 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... State Implementation Plan (SIP). This revision concerns particulate matter (PM) emissions from cement... Reductions of Particulate Emissions from Cement Manufacturing Facilities. In the Rules and Regulations...

  1. Risk Management Plan Rule

    EPA Pesticide Factsheets

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  2. Population management, systems-based practice, and planned chronic illness care: integrating disease management competencies into primary care to improve composite diabetes quality measures.

    PubMed

    Kimura, Joe; DaSilva, Karen; Marshall, Richard

    2008-02-01

    The increasing prevalence of chronic illnesses in the United States requires a fundamental redesign of the primary care delivery system's structure and processes in order to meet the changing needs and expectations of patients. Population management, systems-based practice, and planned chronic illness care are 3 potential processes that can be integrated into primary care and are compatible with the Chronic Care Model. In 2003, Harvard Vanguard Medical Associates, a multispecialty ambulatory physician group practice based in Boston, Massachusetts, began implementing all 3 processes across its primary care practices. From 2004 to 2006, the overall diabetes composite quality measures improved from 51% to 58% for screening (HgA1c x 2, low-density lipoprotein, blood pressure in 12 months) and from 13% to 17% for intermediate outcomes (HgA1c planned visits compared to those who had no planned visits. This study illustrates how 1 delivery system integrated these disease management functions into the front lines of primary care and the positive impact of those changes on overall diabetes quality of care.

  3. Long-term integrated river basin planning and management of water quantity and water quality in mining impacted catchments

    NASA Astrophysics Data System (ADS)

    Pohle, Ina; Zimmermann, Kai; Claus, Thomas; Koch, Hagen; Gädeke, Anne; Uhlmann, Wilfried; Kaltofen, Michael; Müller, Fabian; Redetzky, Michael; Schramm, Martina; Schoenheinz, Dagmar; Grünewald, Uwe

    2015-04-01

    During the last decades, socioeconomic change in the catchment of the Spree River, a tributary of the Elbe, has been to a large extent associated with lignite mining activities and the rapid decrease of these activities in the 1990s. There are multiple interconnections between lignite mining and water management both in terms of water quantity and quality. During the active mining period a large-scale groundwater depression cone has been formed while river discharges have been artificially increased. Now, the decommissioned opencast mines are being transformed into Europe's largest man-made lake district. However, acid mine drainage causes low pH in post mining lakes and high concentrations of iron and sulphate in post mining lakes and the river system. Next to potential changes in mining activities, also the potential impacts of climate change (increasing temperature and decreasing precipitation) on water resources of the region are of major interest. The fundamental question is to what extent problems in terms of water quantity and water quality are exacerbated and whether they can be mitigated by adaptation measures. In consequence, long term water resource planning in the region has to formulate adaptation measures to climate change and socioeconomic change in terms of mining activities which consider both, water quantity and water quality aspects. To assess potential impacts of climate and socioeconomic change on water quantity and water quality of the Spree River catchment up to the Spremberg reservoir in the scenario period up to 2052, we used a model chain which consists of (i) the regional climate model STAR (scenarios with a further increase in temperature of 0 and 2 K), (ii) mining scenarios (mining discharges, cooling water consumption of thermal power plants), (iii) the ecohydrological model SWIM (natural water balance), (iv) the long term water management model WBalMo (managed discharges, withdrawal of water users, reservoir operation) and (v) the

  4. Performance Management Plan

    SciTech Connect

    IT Corporation, Las Vegas, NV

    2002-08-21

    This Performance Management Plan describes the approach for accelerating cleanup activities of U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) Environmental Management (EM) Program. This approach accelerates the reduction of risk at NNSA/NV sites while performing the work responsibly, effectively, and more efficiently. In May 2002, NNSA/NV EM and the Nevada Division of Environmental Protection signed a Letter of Intent formalizing an agreement to pursue accelerated risk reduction and cleanup for activities within the State of Nevada. This Performance Management Plan provides the strategic direction for implementing the Letter of Intent.

  5. Systems engineering management plans.

    SciTech Connect

    Rodriguez, Tamara S.

    2009-10-01

    The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

  6. Integrated surgical emergency training plan in the internship: A step toward improving the quality of training and emergency center management.

    PubMed

    Akhlaghi, Mohammad Reza; Vafamehr, Vajiheh; Dadgostarnia, Mohammad; Dehghani, Alireza

    2013-01-01

    , facing a variety of patients, practicing the role of general practitioners, role-playing on a real patient's bedside, having a multilateral approach to the patient, reducing the wasting time on minor wards, balancing the work and rest schedules of the interns, and better learning and satisfaction of the interns. Over 60% of the participants believed the program has the following benefits: More attention on the training plan, improving the learning of patient management, being more responsive for the training of interns, increasing operational approach to emergency patients, being more aware of the performed actions, and increasing the quality and speed of services provided to patients. The mean score assigned to the whole questionnaire of investigating the viewpoints was 37.5 out of 50. The mean score of the interns' questionnaire was significantly more than the mean score of the assistants. The results obtained indicated that the greatest existing consensus about this plan was the positive impact on the learning of interns in the emergency setting. Thus, it will not only increase the number of patients who the interns are managing during the internship course, but also increases the balance of their workload and they can learn and manage the emergency patients with more leisure.

  7. Integrated surgical emergency training plan in the internship: A step toward improving the quality of training and emergency center management

    PubMed Central

    Akhlaghi, Mohammad Reza; Vafamehr, Vajiheh; Dadgostarnia, Mohammad; Dehghani, Alireza

    2013-01-01

    training of emergency issues, increasing the teamwork, facing a variety of patients, practicing the role of general practitioners, role-playing on a real patient's bedside, having a multilateral approach to the patient, reducing the wasting time on minor wards, balancing the work and rest schedules of the interns, and better learning and satisfaction of the interns. Over 60% of the participants believed the program has the following benefits: More attention on the training plan, improving the learning of patient management, being more responsive for the training of interns, increasing operational approach to emergency patients, being more aware of the performed actions, and increasing the quality and speed of services provided to patients. The mean score assigned to the whole questionnaire of investigating the viewpoints was 37.5 out of 50. The mean score of the interns’ questionnaire was significantly more than the mean score of the assistants. Discussion: The results obtained indicated that the greatest existing consensus about this plan was the positive impact on the learning of interns in the emergency setting. Thus, it will not only increase the number of patients who the interns are managing during the internship course, but also increases the balance of their workload and they can learn and manage the emergency patients with more leisure. PMID:24520557

  8. [Quality of life, work management, and career planning as a primary care technology in the Unified National Health System in São Paulo State, Brazil].

    PubMed

    Lacaz, Francisco Antonio de Castro; Vieira, Nelson Passagem; Cortizo, Carlos Tato; Junqueira, Virgínia; dos Santos, Ana Paula Lopes; Santos, Fabio Souza

    2010-02-01

    This article discusses the concept of quality of life in and at work, linked to health work management based on the evaluation of a work management instrument: the Career, Job, and Wage Plan. The aim was to analyze the plan as a work management technology in primary care in the Unified National Health System (SUS). The article discusses the plan in three municipalities in São Paulo State, Brazil: São Paulo, Guarulhos, and Campinas, in compliance with guidelines issued by the National Health Council in 2006, and using a qualitative survey conducted in 2007-2008. The study presents the findings from research in eight municipalities, based on interviews with managers, users (represented by Health Councils), and health workers and health sector trade unionists. The article concludes that this is still an incipient public management policy issue, with limited command by users, trade unionists, and health workers in the target municipalities, heavily populated 'hub cities' in the health regions.

  9. Environmental Restoration Quality Program Plan

    SciTech Connect

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a entral Environmental Restoration Division'' to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization's objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  10. Groundwater quality assessment plan for single-shell tank waste management Area U at the Hanford Site

    SciTech Connect

    FN Hodges; CJ Chou

    2000-03-21

    Waste Management Area U (WMA U) includes the U Tank Farm, is currently regulated under RCRA interim-status regulations, and is scheduled for closure probably post-2030. Groundwater monitoring has been under an evaluation program that compared general contaminant indicator parameters from downgradient wells to background values established from upgradient wells. One of the indicator parameters, specific conductance, exceeded its background value in one downgradient well triggering a change from detection monitoring to a groundwater quality assessment program. The objective of the first phase of this assessment program is to determine whether the increased concentrations of nitrate and chromium in groundwater are from WMA U or from an upgradient source. Based on the results of the first determination, if WMA U is not the source of contamination, then the site will revert to detection monitoring. If WMA U is the source, then a second part of the groundwater quality assessment plan will be prepared to define the rate and extent of migration of contaminants in the groundwater and their concentrations.

  11. 77 FR 66780 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-07

    ... California Air Resources Board (CARB). Table 1--Submitted Rules Local agency Rule No. Rule title Amended... to the SIP- approved version on June 3, 2011 and CARB submitted them to us on September 27, 2011. C... Control Measure for Architectural Coatings,'' CARB, October 2007. 4. ``Improving Air Quality with Economic...

  12. Planning and Implementing total Quality Management in an Air Force Service Organization: A Case Study

    DTIC Science & Technology

    1988-09-01

    48 IV. Conclusions and Recommendations ...... 52 Lessons Learned ..... .............. 52 Practical Implications ........... 55 Recommendations...traditional quality control methods practically useless in a service-oriented environment (8:9-10). Common threads among the literature indicate these...disseminating known and tried practices , techniques and tools (1:9). Scope This case concerns a single service organization, AFALC, as the unit of

  13. 78 FR 10589 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District; Stationary Source Permits AGENCY: Environmental Protection Agency... by California as a revision to the Sacramento Metropolitan Air Quality Management District (SMAQMD...

  14. Management self assessment plan

    SciTech Connect

    Debban, B.L.

    1998-01-30

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.

  15. PLANNING QUALITY IN GEOSPATIAL PROJECTS

    EPA Science Inventory

    This presentation will briefly review some legal drivers and present a structure for the writing of geospatial Quality Assurance Projects Plans. In addition, the Geospatial Quality Council geospatial information life-cycle and sources of error flowchart will be reviewed.

  16. PLANNING QUALITY IN GEOSPATIAL PROJECTS

    EPA Science Inventory

    This presentation will briefly review some legal drivers and present a structure for the writing of geospatial Quality Assurance Projects Plans. In addition, the Geospatial Quality Council geospatial information life-cycle and sources of error flowchart will be reviewed.

  17. DRMS (Defense Reutilization and Marketing Service) Total Quality Management (TQM) Implementation Plan

    DTIC Science & Technology

    1989-07-01

    ORGANIZATION -j’ Defense Reutilization and Marketing Service. (DR:S) REPORT NUMBER Battle Creek, MI 9. SPONSORING /MONITORING AGENCY NAME(S) AND ADDRESS...to assure continuing improvement and maintenance of high quality service to customers worldwide. EDUCATION The heart of our effort is the continuous...Workshops (Operations, Reutilization, Precious Metals, Environmental and Marketing ). In addition, we will strive to incorporate them into all

  18. Managing Quality: TQM in Libraries.

    ERIC Educational Resources Information Center

    Riggs, Donald E.

    1993-01-01

    Discusses the use of total quality management (TQM) principles in libraries. Topics addressed include commitment from the library director; strategic planning; training needs for library staff; the identification and selection of targeted areas that would benefit from TQM; quality improvement teams; analysis; proposed solutions; and evaluation…

  19. Quality Management in Education.

    ERIC Educational Resources Information Center

    Tribus, Myron

    When transferring the methods of quality management from industry to academia, there are important differences that must be considered. This paper describes the differences between traditional management and quality management, and shows how Deming's principles of Total Quality Management (TQM) can be applied to education. Some of these principles…

  20. SWiFT Software Quality Assurance Plan.

    SciTech Connect

    Berg, Jonathan Charles

    2016-01-01

    This document describes the software development practice areas and processes which contribute to the ability of SWiFT software developers to provide quality software. These processes are designed to satisfy the requirements set forth by the Sandia Software Quality Assurance Program (SSQAP). APPROVALS SWiFT Software Quality Assurance Plan (SAND2016-0765) approved by: Department Manager SWiFT Site Lead Dave Minster (6121) Date Jonathan White (6121) Date SWiFT Controls Engineer Jonathan Berg (6121) Date CHANGE HISTORY Issue Date Originator(s) Description A 2016/01/27 Jon Berg (06121) Initial release of the SWiFT Software Quality Assurance Plan

  1. Quality assurance program plan for Building 327

    SciTech Connect

    Tanke, J.M.

    1997-05-22

    This Quality Assurance Program Plan (QAPP) provides an overview of the quality assurance program for Building 327. The program applies to the facility safety structures, systems, and components and to activities that could affect safety structures, systems, and components. Adherence to the quality assurance program ensures the following: US Department of Energy missions and objectives are effectively accomplished; Products and services are safe, reliable, and meet or exceed the requirements and expectations of the user; Hazards to the public, to Hanford Site and facility workers, and to the environment are minimized. The format of this Quality Assurance Program Plan is structured to parallel that of 10 CFR 83 0.120, Quality Assurance Requirements. This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the 324 Building B-Cell Safety Cleanout Project (BCCP). This QAPP is responsive to the Westinghouse Hanford Company Quality Assurance Program and Implementation Plan, WHC-SP 113 1, for 10 CFR 830.120, Nuclear Safety Management, Quality Assurance Requirements; and DOE Order 5700.6C, Quality Assurance. This QAPP supersedes PNNL PNL-MA-70 QAP Quality Assurance Plan No. WTC-050 Rev. 2, issue date May 3, 1996.

  2. Soil quality is key for planning and managing urban allotments intended for the sustainable production of home-consumption vegetables.

    PubMed

    Bretzel, F; Calderisi, M; Scatena, M; Pini, R

    2016-09-01

    The growing importance of urban allotments in planning and managing urban areas is due to the combined positive effects on ecosystem services, the economy and human well-being, especially of groups of the urban population that can be vulnerable (e.g. the elderly, immigrants, low-income families). Some studies have highlighted the potential risk of contamination by metals of vegetables grown in urban areas and the lack of appropriate site-specific risk assessments. However, surveys are still lacking on the possibilities of using urban soil as a good substrate to produce vegetables for home consumption. We assessed the soil quality in two areas in Pisa (Italy), one intended for urban horticulture and the other already cultivated for that purpose. We analysed the soils for the main chemical and physical characteristics (texture, bulk density, water stability index, pH, cation exchange capacity, organic carbon, total nitrogen, phosphorous) and elements (Pb, Cu, Ni, Cr, Zn, Cd, As, K, Al and Mn). Our results showed that both areas had physical and chemical heterogeneity due to the effects of urbanization and to the different cultivation techniques employed. The metal content was lower than the guidelines limits, and the soil conditions (pH = 8) greatly reduced the metal mobility. Copper concentration in some of the cultivated area samples was higher than the limits, representing a possible stress factor for the microbial biodiversity and fauna. Our findings demonstrate that site-specific surveys are necessary before planning urban cultivation areas, and educating urban gardeners regarding sustainable cultivation techniques is a priority for a safe environment.

  3. Plutonium Vulnerability Management Plan

    SciTech Connect

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  4. 76 FR 55621 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-08

    ... expandable polystyrene product manufacturing operations. We are proposing to approve a local rule to regulate... local rule: Yolo-Solano Air Quality Management District Rule 2.41, Expandable Polystyrene Manufacturing...

  5. Reactor Operations Management Plan

    SciTech Connect

    Rice, P.D.

    1991-12-05

    The K-Reactor last operated in April 1988. At that time, K-Reactor was one of three operating reactors at the Savannah River Site (SRS). Following an incident in P-Reactor in August 1988, it was decided to discontinue SRS reactor operation and conduct an extensive program to upgrade operating practices and plant hardware prior to restart of any of the reactors. The K-reactor was the first of three reactors scheduled to resume production. At the present time, it is the only reactor with planned restart. WSRC assumed management of SRS on April 1, 1989. WSRC established the Safety Basis for Restart and a listing of the actions planned to satisfy the Safety Basis. In consultation with DOE, it was determined that proper management of the restart activities would require a single plan that integrated the numerous activities. The plan was entitled the Reactor Operations Management Plan and is referred to simply as the ROMP. The initial version of ROMP was produced in July of 1989. Subsequent modifications led to Revision 3 which was approved by DOE in May, 1990. Other changes were made in a formal change process, resulting in the latest version, Revision 5, being issued in October, 1990. The ROMP contains three key parts: first, the Restart Safety Basis; second, a description of the process for addressing new technical issues and a listing of the established workscope and the associated acceptance criteria; and three, a schedule for executing the work. I will discuss the first two areas, along with the closure process used to assure the intent of ROMP was met. The ROMP activities are all complete and I will not discuss schedule further.

  6. Building Air Quality. Action Plan.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Indoor Air Div.

    Building managers and owners often confront competing demands to reduce operating costs and increase revenues that can siphon funds and resources from other building management concerns such as indoor air quality (IAQ). This resource booklet, designed for use with the "Building Air Quality Guide," provides building owners and managers with an…

  7. Sabah Shoreline Management Plan

    NASA Astrophysics Data System (ADS)

    Jakobsen, Flemming; Frachisse, Julien; Hartstein, Neil

    The management of the coastline around Sabah faces numerous conflicting interests from the public, private, and industry groups. The public demands socio-economic growth, sustainable development, and preservation of natural resources while the private sector and industry demand local coastal protection and often reckless development. To resolve these issues the creation of a management plan for Sabah's coastline has been initiated. Numerical models of both catchments and sea were used to integrate available information and simulate the consequences of different development scenarios. The focus of the paper is on the integration of information, but some details are also given on the important conflicts and habitat threats.

  8. Biohazardous waste management plan.

    SciTech Connect

    Lane, Todd W.

    2004-01-01

    This plan describes the process for managing non-medical biohazardous waste at Sandia National Laboratories California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of biohazardous waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to non-medical biohazardous waste.

  9. Medical waste management plan.

    SciTech Connect

    Lane, Todd W.; VanderNoot, Victoria A.

    2004-12-01

    This plan describes the process for managing research generated medical waste at Sandia National Laboratories/California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of medical waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to medical waste.

  10. Angina self-management plan and quality of life, anxiety and depression in post coronary angioplasty patients.

    PubMed

    Moattari, Marzieh; Adib, Fakhteh; Kojuri, Javad; Tabatabaee, Seyed Hamid Reza

    2014-11-01

    Coronary artery diseases are the most frequent cause of mortality in industrialized countries as well as Iran. Coronary artery disease affects patient's quality of life (QoL) and produces some degrees of anxiety and depression. Although self-management programs have shown significant impact on chronic diseases, there is limited evidence in Iran regarding the effectiveness of these interventions, particularly in patients with coronary artery disease. This study aimed to evaluate the effects of angina plan on QoL, anxiety, and depression in post coronary angioplasty patients referred to selected hospitals in Shiraz. This parallel randomized, controlled trial was conducted in selected hospitals in Shiraz, Iran. We enrolled 80 post coronary angioplasty eligible patients in the study. After acquisition of the informed consent, eligible patients were randomly divided into two groups: control and experimental. Pretest data were obtained by using a demographic data form and two valid and reliable questionnaires for QoL, anxiety, and depression. Blood pressure, weight, and height (to calculate body mass index) were measured too. Patient's history of smoking, diabetes, hypercholesterolemia, hypertension, and coronary vascular involvement (with grade and severity) were obtained from their medical records. A 12-week angina plan intervention consisted of a 30 to 40 minutes of counseling interview and telephone follow up at the end of 1, 4, 8, and 12 weeks were performed for experimental group. Post-test data were obtained three months after the pretest using the same questionnaires as pretest. QoL data were analyzed by analysis of co-variance (ANCOVA). The results (before and after intervention) regarding anxiety and depression were analyzed by independent t-tests or their equivalent nonparametric Mann-Whitney test using SPSS v. 11.5. There was no statistically significant difference in demographic variables between two groups. Baseline mean scores for QoL, anxiety, and

  11. Strategic Planning and Financial Management

    ERIC Educational Resources Information Center

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  12. Strategic Planning and Financial Management

    ERIC Educational Resources Information Center

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  13. 75 FR 40762 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental... Sacramento Metropolitan Air Quality Management District (SMAQMD) and South Coast Air Quality...

  14. Implementing Laboratory Quality Management Systems in Mozambique: The Becton Dickinson-US President's Emergency Plan for AIDS Relief Public-Private Partnership Initiative.

    PubMed

    Skaggs, Beth; Pinto, Isabel; Masamha, Jessina; Turgeon, David; Gudo, Eduardo Samo

    2016-04-15

    Mozambique's ministry of health (MOH) recognized the need to establish a national laboratory quality assurance (NLQA) program to improve the reliability and accuracy of laboratory testing. The Becton Dickinson-US President's Emergency Plan for AIDS Relief Public-Private Partnership (PPP) was used to garner MOH commitment and train a cadre of local auditors and managers to support sustainability and country ownership of a NLQA program. From January 2011 to April 2012, the World Health Organization Regional Office for Africa Stepwise Laboratory Quality Improvement Process Towards Accreditation (SLIPTA) checklist and the Strengthening Laboratory Management Towards Accreditation (SLMTA) curriculum were used in 6 MOH laboratories. PPP volunteers provided training and mentorship to build the capacity of local auditors and program managers to promote institutionalization and sustainability of the program within the MOH. SLIPTA was launched in 6 MOH laboratories, and final audits demonstrated improvements across the 13 quality system essentials, compared with baseline. Training and mentorship of MOH staff by PPP volunteers resulted in 18 qualified auditors and 28 managers/quality officers capacitated to manage the improvement process in their laboratories. SLIPTA helps laboratories improve the quality and reliability of their service even in the absence of full accreditation. Local capacity building ensures sustainability by creating country buy-in, reducing costs of audits, and institutionalizing program management. Published by Oxford University Press for the Infectious Diseases Society of America 2016. This work is written by (a) US Government employee(s) and is in the public domain in the US.

  15. Implementing Laboratory Quality Management Systems in Mozambique: The Becton Dickinson–US President's Emergency Plan for AIDS Relief Public-Private Partnership Initiative

    PubMed Central

    Skaggs, Beth; Pinto, Isabel; Masamha, Jessina; Turgeon, David; Gudo, Eduardo Samo

    2016-01-01

    Background. Mozambique's ministry of health (MOH) recognized the need to establish a national laboratory quality assurance (NLQA) program to improve the reliability and accuracy of laboratory testing. The Becton Dickinson–US President's Emergency Plan for AIDS Relief Public-Private Partnership (PPP) was used to garner MOH commitment and train a cadre of local auditors and managers to support sustainability and country ownership of a NLQA program. Methods. From January 2011 to April 2012, the World Health Organization Regional Office for Africa Stepwise Laboratory Quality Improvement Process Towards Accreditation (SLIPTA) checklist and the Strengthening Laboratory Management Towards Accreditation (SLMTA) curriculum were used in 6 MOH laboratories. PPP volunteers provided training and mentorship to build the capacity of local auditors and program managers to promote institutionalization and sustainability of the program within the MOH. Results. SLIPTA was launched in 6 MOH laboratories, and final audits demonstrated improvements across the 13 quality system essentials, compared with baseline. Training and mentorship of MOH staff by PPP volunteers resulted in 18 qualified auditors and 28 managers/quality officers capacitated to manage the improvement process in their laboratories. Conclusions. SLIPTA helps laboratories improve the quality and reliability of their service even in the absence of full accreditation. Local capacity building ensures sustainability by creating country buy-in, reducing costs of audits, and institutionalizing program management. PMID:27025698

  16. Quality-Planning-Requirements Documents

    NASA Technical Reports Server (NTRS)

    Leonard, P. A.; Flores, A.

    1983-01-01

    Report outlines planning procedures used in establishing inspection and quality assurance activities required of contractors constructing and testing Space Shuttle and ground-support equipment. Report useful to contractors establishing inspection points in commercial manufacturing operations.

  17. Quality assurance plan for the data acquisition and management system for monitoring the fuel oil spill at the Sandia National Laboratories installation in Livermore, California

    SciTech Connect

    Peerenboom, J.P.; Leser, C.C.; Ramsey, G.M.; Widing, M.A.

    1995-04-01

    In February 1975, the accidental puncture of an underground transfer line buried about 4 ft below the ground surface at the SNL installation in Livermore, California, resulted in the release of approximately 225.5 m{sup 3} of No. 2 diesel fuel. This report describes the formal quality assurance plan that will be used for the data acquisition and management system developed to monitor a bioremediation pilot study by Argonne National Laboratory in association with Sandia National Laboratories. The data acquisition and management system will record the site data during the bioremediation effort and assist users in site analysis. The designs of the three major subsystems of this system are described in this report. Quality assurance criteria are defined for the management, performance, and assessment of the system. Finally, the roles and responsibilities for configuration management of this system are defined for the entire life cycle of the project.

  18. Statistical quality management

    NASA Astrophysics Data System (ADS)

    Vanderlaan, Paul

    1992-10-01

    Some aspects of statistical quality management are discussed. Quality has to be defined as a concrete, measurable quantity. The concepts of Total Quality Management (TQM), Statistical Process Control (SPC), and inspection are explained. In most cases SPC is better than inspection. It can be concluded that statistics has great possibilities in the field of TQM.

  19. Management: Total Army Quality Management

    DTIC Science & Technology

    2002-03-15

    meet current and future customer needs . 3–2. Strategic planning a. Strategic planning is the process by which managers at higher levels envision their...framework for all Army organizations to measure how well they are meeting their stated goals and customer needs . It provides a systematic review that...business. (2) Customer-Driven – The organization’s focus is on its customers – ensuring its operations meet customer needs in the most efficient manner

  20. Environmental Management System Plan

    SciTech Connect

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These

  1. Project Management Plan

    SciTech Connect

    Not Available

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

  2. 75 FR 37308 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-29

    ... YSAQMD 3.21 Rice Straw Emission 12/10/08 03/17/09 Reduction Credits. We proposed to approve this rule...) * * * (i) * * * (C) Yolo Solano Air Quality Management District (1) Rule 3.21, ``Rice Straw Emission...), particulate matter (PM), and carbon monoxide (CO) emissions from the permanent curtailment of burning rice...

  3. EPA Guidance for Geospatially Related Quality Assurance Project Plans

    EPA Pesticide Factsheets

    This March 2003 document discusses EPA's Quality Assurance (QA) Project Plan as a tool for project managers and planners to document the type and quality of data and information needed for making environmental decisions

  4. Managing the Quality of Environmental Data in EPA Region 9

    EPA Pesticide Factsheets

    EPA Pacific Southwest, Region 9's Quality Assurance (QA) section's primary mission is to effectively oversee and carry out the Quality System and Quality Management Plan, and project-level quality assurance and quality control (QA/QC) activities.

  5. Strategic Planning and Quality Assurance in the Bologna Process

    ERIC Educational Resources Information Center

    Kettunen, Juha; Kantola, Mauri

    2007-01-01

    Strategic planning and quality management have been developed independently of each other, but they meet in practice in many kinds of organisations. Strategic planning and quality assurance integrate different aspects of higher education institutions (HEIs) to ensure high-quality educational outcomes. This paper investigates the role of these two…

  6. Strategic Planning and Quality Assurance in the Bologna Process

    ERIC Educational Resources Information Center

    Kettunen, Juha; Kantola, Mauri

    2007-01-01

    Strategic planning and quality management have been developed independently of each other, but they meet in practice in many kinds of organisations. Strategic planning and quality assurance integrate different aspects of higher education institutions (HEIs) to ensure high-quality educational outcomes. This paper investigates the role of these two…

  7. Hanford Tanks Initiative quality assurance implementation plan

    SciTech Connect

    Huston, J.J.

    1998-06-23

    Hanford Tanks Initiative (HTI) Quality Assurance Implementation Plan for Nuclear Facilities defines the controls for the products and activities developed by HTI. Project Hanford Management Contract (PHMC) Quality Assurance Program Description (QAPD)(HNF-PRO599) is the document that defines the quality requirements for Nuclear Facilities. The QAPD provides direction for compliance to 10 CFR 830.120 Nuclear Safety Management, Quality Assurance Requirements. Hanford Tanks Initiative (HTI) is a five-year activity resulting from the technical and financial partnership of the US Department of Energy`s Office of Waste Management (EM-30), and Office of Science and Technology Development (EM-50). HTI will develop and demonstrate technologies and processes for characterization and retrieval of single shell tank waste. Activities and products associated with HTI consist of engineering, construction, procurement, closure, retrieval, characterization, and safety and licensing.

  8. Groundwater quality assessment plan for single-shell waste management area B-BX-BY at the Hanford Site

    SciTech Connect

    SM Narbutovskih

    2000-03-31

    Pacific Northwest National Laboratory conducted a first determination groundwater quality assessment at the Hanford Site. This work was performed for the US Department of Energy, Richland Operations Office, in accordance with the Federal Facility Compliance Agreement during the time period 1996--1998. The purpose of the assessment was to determine if waste from the Single-Shell Tank (SST) Waste Management Area (WMA) B-BX-BY had entered the groundwater at levels above the drinking water standards (DWS). The resulting assessment report documented evidence demonstrating that waste from the WMA has, most likely, impacted groundwater quality. Based on 40 CFR 265.93 [d] paragraph (7), the owner-operator must continue to make the minimum required determinations of contaminant level and of rate/extent of migrations on a quarterly basis until final facility closure. These continued determinations are required because the groundwater quality assessment was implemented prior to final closure of the facility.

  9. Total Quality Management Simplified.

    ERIC Educational Resources Information Center

    Arias, Pam

    1995-01-01

    Maintains that Total Quality Management (TQM) is one method that helps to monitor and improve the quality of child care. Lists four steps for a child-care center to design and implement its own TQM program. Suggests that quality assurance in child-care settings is an ongoing process, and that TQM programs help in providing consistent, high-quality…

  10. Total Quality Management Simplified.

    ERIC Educational Resources Information Center

    Arias, Pam

    1995-01-01

    Maintains that Total Quality Management (TQM) is one method that helps to monitor and improve the quality of child care. Lists four steps for a child-care center to design and implement its own TQM program. Suggests that quality assurance in child-care settings is an ongoing process, and that TQM programs help in providing consistent, high-quality…

  11. Water resource management planning guide for Savannah River Plant

    SciTech Connect

    Hubbard, J.E.; Stephenson, D.E.; Steele, J.L. and Co., Aiken, SC . Savannah River Lab.); Gordon, D.E. and Co., Aiken, SC . Savannah River Plant)

    1988-10-01

    The Water Resource Management Planning Guide provides an outline for the development of a Savannah River Plant Water Resource Management Plan (WRMP) to protect, manage, and monitor the site's water resources. The management plan is based on three principle elements: (1) protection of the water quality, (2) management of the water quantity, and (3) monitoring of the water quality and quantity. The plan will assure that changes in water quality and quantity are identified and that corrective action is implemented as needed. In addition, water management activities within and between Savannah River Plant (SRP) organizations and departments will be coordinated to ensure the proper management of water resources. This document is intended as a guide to suggest goals and objectives that will provide a basis for the development of a water resource plan for SRP. Planning should be flexible rather than rigid, and the plan outlines in this document was prepared to be modified or updated as conditions necessitate. 16 refs., 12 figs.

  12. Quality management in orthodontics.

    PubMed

    Prahl-Andersen, Birte

    2005-11-01

    The introduction of modern quality thinking to orthodontic care should be a continuing effort on the part of the orthodontic profession. The strategy for the development of a European quality management system in orthodontic care was developed from 1993 to 2000 during the EURO-QUAL project. During the project's first stage, the basic prerequisites were identified for a general model of quality management in orthodontic care. A supra-national agreement was reached on policy statements for orthodontic care in Europe. The essential components of an orthodontic quality management system are: linking orthodontic care to population need, patient partnership, clinical accountability, and containing costs.Value-based health care and "TQM", the philosophy of total quality management, are basic principles applied in accordance with the recommendations of the European Health Committee of September 1997 and the "Health-for-All" policy framework of the World Health Organization.

  13. Web applications for total quality management.

    PubMed

    Golaz, O; Hochstrasser, D

    1999-05-01

    Total quality management involves the consideration of many quality subjects as part of the management, such as quality processes, quality education, quality assurance, quality planning, quality results and quality document management. But crucial quality elements are also communication, data management and information sharing. Web applications and other associated computer communication applications such as E-mail and newsgroups, for example, offer to the laboratory environment the best tools to achieve proper communication and data management/sharing. These applications, enabling the set-up of Internet and Intranet sites, are used to share the information in the form of simple text pages or of completely interactive pages, which could comprise audio and video files, web page formulae and web data management applications. These applications are being associated to several applications and also being integrated into the laboratory information system (LIS).

  14. Technical and Non-Technical Measures for air pollution emission reduction: The integrated assessment of the regional Air Quality Management Plans through the Italian national model

    NASA Astrophysics Data System (ADS)

    D'Elia, I.; Bencardino, M.; Ciancarella, L.; Contaldi, M.; Vialetto, G.

    2009-12-01

    The Italian Air Quality legislation underwent sweeping changes with the implementation of the 1996 European Air Quality Framework Directive when the Italian administrative Regions were entrusted with air quality management tasks. The most recent Regional Air Quality Management Plans (AQMPs) highlighted the importance of Non-Technical Measures (NTMs), in addition to Technical Measures (TMs), in meeting environmental targets. The aim of the present work is to compile a list of all the TMs and NTMs taken into account in the Italian Regional AQMPs and to give in the target year, 2010, an estimation of SO 2, NO x and PM 10 emission reductions, of PM 10 concentration and of the health impact of PM 2.5 concentrations in terms of Life Expectancy Reduction. In order to do that, RAINS-Italy, as part of the National Integrated Modeling system for International Negotiation on atmospheric pollution (MINNI), has been applied. The management of TMs and NTMs inside RAINS have often obliged both the introduction of exogenous driving force scenarios and the control strategy modification. This has inspired a revision of the many NTM definitions and a clear choice of the definition adopted. It was finally highlighted that only few TMs and NTMs implemented in the AQMPs represent effective measures in reaching the environmental targets.

  15. Using Quality Improvement Methods to Implement an Electronic Medical Record (EMR) Supported Individualized Home Pain Management Plan for Children with Sickle Cell Disease

    PubMed Central

    Crosby, Lori E.; Simmons, Kenya; Kaiser, Peggy; Davis, Blair; Boyd, Patricia; Eichhorn, Tiffany; Mahaney, Tracy; Joffe, Naomi; Morgan, Darice; Schibler, Kathy; Anderson, Viia; Quinn, Charles T.; Kalinyak, Karen A.

    2014-01-01

    Objective Using quality improvement methodology, our goal was to develop and implement individualized home pain management plans (HPMP) that included pharmacologic as well as non-pharmacologic strategies for children with sickle cell disease (SCD). We hypothesized that successfully implemented HPMPs would have an impact on Emergency Department (ED) use, decreasing ED visits for uncomplicated SCD pain episodes. Methods A multidisciplinary quality improvement team developed a questionnaire to assess the frequency, location and severity of a patient’s pain during a routine, comprehensive visit in order to help the patient and family develop an effective pain management strategy using both pharmacologic and non-pharmacologic actions. Using plan do study act cycles (PDSAs), this team was able to build this process into the daily workflow for all SCD patients age 5 years to 21 years of age. Patients with comprehensive visits scheduled from January 2012 to May 2013 were included (N=188) in the intervention. Results By May of 2013, 88% of eligible patients had an individualized HPMP in place. There was a concomitant reduction in the percentage of SCD patients seen in the ED for uncomplicated SCD pain (6.9% vs. 1.1%). Conclusions Using quality improvement methods, an individualized HPMP intervention was incorporated successfully into the daily workflow of a busy outpatient SCD clinic. This intervention has the potential to improve patient outcomes by decreasing avoidable ED visits as well as reducing overall healthcare costs. PMID:25258504

  16. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    SciTech Connect

    Frazier, T.P.

    1994-10-20

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans.

  17. Transforming air quality management

    SciTech Connect

    Janet McCabe

    2005-04-01

    Earlier this year, the Clean Air Act Advisory Committee submitted to EPA 38 recommendations intended to improve air quality management in the United States. This article summarizes the evaluation process leading up to the Committee's recommendations. 3 refs., 2 figs.

  18. Waste Management Program management plan. Revision 1

    SciTech Connect

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  19. Quality Management for Schools.

    ERIC Educational Resources Information Center

    Mulligan, Dorothy

    1992-01-01

    W. Edwards Deming introduced management principles that helped Japan become a world economic power. Virginia is attempting to adapt these techniques to education with a grant that provides training and support for school personnel in several school districts. Describes a quality management program at Christa McAuliffe Elementary School that has…

  20. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify... arrangements to be used in coordinating intrastate, interstate and regional water resources planning activities...

  1. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify... arrangements to be used in coordinating intrastate, interstate and regional water resources planning activities...

  2. Outcomes Oriented Planning, Management, and Evaluation.

    ERIC Educational Resources Information Center

    Kinnison, Charles J.

    An outcomes orientation is examined as the dominant focus for formulating improvements in a college's planning, management, and evaluation (PME) system. Outcomes are seen as individual (produced by college personnel or students), program related, or institutional. An outcomes orientation to PME has the advantages of relating to the quality of…

  3. Multipollutant air quality management.

    PubMed

    Hidy, George M; Pennell, William T

    2010-06-01

    On the basis of a recent NARSTO assessment, this review discusses the factors involved in the implementation of a risk- and results-based multipollutant air quality management strategy applicable to North America. Such a strategy could evolve from current single-pollutant regulatory practices using a series of steps that would seek to minimize risk of exposure for humans and ecosystems while providing for a quantitative evaluation of the effectiveness of the management process. The tools needed to support multipollutant air quality management are summarized. They include application of a formal risk analysis, accounting for atmospheric processes, ambient measurements, emissions characterization, air quality modeling of emissions to ambient concentrations, and characterization of human and ecological responses to ambient pollutant exposure. The new management strategy would expand the current practice of accountability that relates emission reductions and attainment of air quality derived from air quality criteria and standards. Conceptually, achievement of accountability would establish goals optimizing risk reduction associated with pollution management. This expanded approach takes into account the sequence of processes from emissions reduction to resulting changes in ambient concentration. Using ambient concentration as a proxy for exposure, the resulting improvement in human and ecosystem health is estimated. The degree to which this chain of processes and effects can be achieved in current practice is examined in a multipollutant context exemplified by oxidants, as indicated by ozone, particulate matter, and some hazardous air pollutants. Achievement of a multipollutant management strategy will mostly depend on improving knowledge about human and ecosystem response to pollutant exposure.

  4. Managing Changes in Building Plans.

    ERIC Educational Resources Information Center

    Schoolhouse of Quality, 2000

    2000-01-01

    Examines why school building plans get modified, how it affects the new school, and what can be done to plan for it. The role of the architect in managing change and use of a contingency fund are discussed as are the five types of changes that can happen and how they should be paid for. (GR)

  5. Sandia software guidelines: Software quality planning

    SciTech Connect

    Not Available

    1987-08-01

    This volume is one in a series of Sandia Software Guidelines intended for use in producing quality software within Sandia National Laboratories. In consonance with the IEEE Standard for Software Quality Assurance Plans, this volume identifies procedures to follow in producing a Software Quality Assurance Plan for an organization or a project, and provides an example project SQA plan. 2 figs., 4 tabs.

  6. Project Management for Quality Improvement in Radiology.

    PubMed

    Larson, David B; Mickelsen, L Jake

    2015-11-01

    This article outlines a structured approach for applying project management principles to quality improvement in radiology. We highlight the framework we use for managing improvement projects in our department and review basic project management principles. Project management involves techniques for executing projects effectively and efficiently. We recognize the following phases for managing improvement projects: idea, project evaluation and selection, role assignment, planning, improvement, and sustaining improvement.

  7. 76 FR 69927 - Approval of Air Quality Implementation Plans; California; South Coast; Attainment Plan for 1997...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-09

    ...EPA is approving in part and disapproving in part state implementation plan (SIP) revisions submitted by California to provide for attainment of the 1997 fine particulate matter (PM2.5) national ambient air quality standards in the Los Angeles-South Coast area (South Coast). These SIP revisions are the South Coast 2007 Air Quality Management Plan (South Coast 2007 AQMP) (revised......

  8. Near-facility environmental monitoring quality assurance project plan

    SciTech Connect

    McKinney, S.M.

    1997-11-24

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site.

  9. NASA total quality management 1989 accomplishments report

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Described here are the accomplishments of NASA as a result of the use of Total Quality Management (TQM). The principles in practice which led to these process refinements are important cultural elements to any organization's productivity and quality efforts. The categories of TQM discussed here are top management leadership and support, strategic planning, focus on the customer, employee training and recognition, employee empowerment and teamwork, measurement and analysis, and quality assurance.

  10. AVLIS production plant waste management plan

    SciTech Connect

    Not Available

    1984-11-15

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables.

  11. Quality management under current conditions

    NASA Astrophysics Data System (ADS)

    Vasiliev, V. A.; Aleksandrova, S. V.

    2015-12-01

    The diversity of the concept of quality is defined. Modern quality management methods and tools are considered. The global components of quality management and quality management system ISO 9000 are discussed. Education requirements for specialists in the field of quality are formulated.

  12. Hanford site sodium management plan

    SciTech Connect

    Guttenberg, S.

    1995-09-25

    The Hanford Site Sodium Management Plan, Revision 1, provides changes to the major elements and management strategy to ensure an integrated and coordinated approach for disposition of the more than 350,000 gallons of sodium and related sodium facilities located at the DOE`s Hanford Site

  13. Construction Management: Planning Ahead.

    ERIC Educational Resources Information Center

    Arsht, Steven

    2003-01-01

    Explains that preconstruction planning is essential when undertaking the challenges of a school building renovation or expansion, focusing on developing a detailed estimate, creating an effective construction strategy, conducting reviews and value-engineering workshops, and realizing savings through effective risk analysis and contingency…

  14. Risk Management Plan

    SciTech Connect

    HODGES, ANN LOUISE; FROEHLICH, GARY K.; PILCH, MARTIN; PEERCY, DAVID E.

    2002-04-01

    This document describes a proactive plan for assessing and controlling sources of risk for the ASCI (Accelerated Strategic Computing Initiative) V&V program at Sandia National Laboratories. It offers a graded approach for identifying, analyzing, prioritizing, responding to, and monitoring risks.

  15. Construction Management: Planning Ahead.

    ERIC Educational Resources Information Center

    Arsht, Steven

    2003-01-01

    Explains that preconstruction planning is essential when undertaking the challenges of a school building renovation or expansion, focusing on developing a detailed estimate, creating an effective construction strategy, conducting reviews and value-engineering workshops, and realizing savings through effective risk analysis and contingency…

  16. Quality Management and Information Brokerage.

    ERIC Educational Resources Information Center

    van Halm, Johan

    1995-01-01

    To compete effectively, information brokers need to adopt management and marketing tools; Total Quality Management can upgrade an organization's performance by using customer feedback of its services. SERVQUAL identifies gaps in service by assessing quality expectations versus quality experiences. (AEF)

  17. Quality Management and Information Brokerage.

    ERIC Educational Resources Information Center

    van Halm, Johan

    1995-01-01

    To compete effectively, information brokers need to adopt management and marketing tools; Total Quality Management can upgrade an organization's performance by using customer feedback of its services. SERVQUAL identifies gaps in service by assessing quality expectations versus quality experiences. (AEF)

  18. Hypothetical scenario exercises to improve planning and readiness for drinking water quality management during extreme weather events.

    PubMed

    Deere, Daniel; Leusch, Frederic D L; Humpage, Andrew; Cunliffe, David; Khan, Stuart J

    2017-03-15

    Two hypothetical scenario exercises were designed and conducted to reflect the increasingly extreme weather-related challenges faced by water utilities as the global climate changes. The first event was based on an extreme flood scenario. The second scenario involved a combination of weather events, including a wild forest fire ('bushfire') followed by runoff due to significant rainfall. For each scenario, a panel of diverse personnel from water utilities and relevant agencies (e.g. health departments) formed a hypothetical water utility and associated regulatory body to manage water quality following the simulated extreme weather event. A larger audience participated by asking questions and contributing key insights. Participants were confronted with unanticipated developments as the simulated scenarios unfolded, introduced by a facilitator. Participants were presented with information that may have challenged their conventional experiences regarding operational procedures in order to identify limitations in current procedures, assumptions, and readily available information. The process worked toward the identification of a list of specific key lessons for each event. At the conclusion of each simulation a facilitated discussion was used to establish key lessons of value to water utilities in preparing them for similar future extreme events.

  19. Visible Management Planning

    ERIC Educational Resources Information Center

    Greene, Walter E.

    1977-01-01

    Identification of the subsystems in the personnel management function provides an audit framework that leads to a more efficient development of the human resources within the organization. (Author/IRT)

  20. Environmental Restoration Quality Program Implementation Plan

    SciTech Connect

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  1. Minerals Management Service: Strategic plan

    SciTech Connect

    1997-09-30

    This plan addresses the management of the mineral resources on the Outer Continental Shelf in an environmentally sound and safe manner and the timely collection, verification, and distribution of mineral revenues from Federal and Indian lands. The Minerals Management Service (MMS) manages the Nation`s natural gas, oil and other mineral resources on the Outer Continental Shelf (OCS), and collects, accounts for, and disburses revenues from offshore federal mineral leases and from onshore mineral leases on Federal and Indian lands.

  2. Process chemistry {ampersand} statistics quality assurance plan

    SciTech Connect

    Meznarich, H.K.

    1996-08-01

    This document provides quality assurance guidelines and quality control requirements for Process Chemistry and Statistics. This document is designed on the basis of Hanford Analytical Services Quality Assurance Plan (HASQAP) technical guidelines and is used for governing process chemistry activities.

  3. Information Resources Management Plan.

    DTIC Science & Technology

    1983-08-01

    and report on unfair labor practices , contract identified and evaluated in a systematic manner and agency grievances, adverse actions, and union through...will be practically eliminated, As a result of this plan, the agency will be able to and separate independent data systems will be phased identify...Accident/ Incldent Data System c. Equipment Requirements ad Implcations : The (AIDS)-Mark I NTSB will communicate via a direct line with FAA in- a

  4. Underground storage tank management plan

    SciTech Connect

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  5. Fact Sheet - Managing Ozone Air Quality: Findings on Failure to Submit Elements of 1997 Ozone NAAQS State Implementation Plan

    EPA Pesticide Factsheets

    This fact sheet provides a basic overview of the May 17, 2008 notice that 11 states missed their deadlines to submit their state implementation plans (SIPs). The deadlines are for submitting complete plans showing how they will meet the 1997 ozone standard

  6. Total Quality Management.

    ERIC Educational Resources Information Center

    Focus in Change, 1992

    1992-01-01

    The philosophy known as Total Quality Management (TQM) is frequently presented as a way to change and improve public education. This issue of "Focus in Change" examines Deming's original 14 TQM points and their application to education. Myron Tribus lays out the core philosophy of the movement and discusses its possible application to…

  7. Total Quality Management Seminar.

    ERIC Educational Resources Information Center

    Massachusetts Career Development Inst., Springfield.

    This booklet is one of six texts from a workplace literacy curriculum designed to assist learners in facing the increased demands of the workplace. The booklet contains seven sections that cover the following topics: (1) meaning of total quality management (TQM); (2) the customer; (3) the organization's culture; (4) comparison of management…

  8. GSC configuration management plan

    NASA Technical Reports Server (NTRS)

    Withers, B. Edward

    1990-01-01

    The tools and methods used for the configuration management of the artifacts (including software and documentation) associated with the Guidance and Control Software (GCS) project are described. The GCS project is part of a software error studies research program. Three implementations of GCS are being produced in order to study the fundamental characteristics of the software failure process. The Code Management System (CMS) is used to track and retrieve versions of the documentation and software. Application of the CMS for this project is described and the numbering scheme is delineated for the versions of the project artifacts.

  9. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    SciTech Connect

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  10. Solid Waste Management Program Plan

    SciTech Connect

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  11. Total Quality Management Goes to Community College.

    ERIC Educational Resources Information Center

    DeCosmo, Richard D.; And Others

    1991-01-01

    This article details the four-year implementation of Total Quality Management at Delaware County Community College (Pennsylvania) to conserve resources, improve effectiveness, assure quality, and increase participation in decision making. Reported are planning, execution, and monitoring activities of the Implementation Team; specific problems…

  12. A reservoir management plan

    SciTech Connect

    Allis, R.G.

    1989-06-16

    There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

  13. [Quality management in cardiovascular echography].

    PubMed

    Gullace, Giuseppe

    2002-12-01

    The quality management of an organization can be defined as the ability to identify, plan and implement programs of measure, analysis, verification and control that allow to monitor management, resources, activities, processes and output/outcome of the same organization, including the satisfaction of the customers. Whatever the model used, it is demonstrated that the management-quality system, either for professional quality or for organization, turns out to be effective even in the health organizations within and to any level of organizational-structural complexity. The present paper concerns the experience of the Italian Society of Cardiovascular Echography (SIEC) on quality certification, both as a scientific society compared to other health organizations and to cardiovascular echo laboratories, and the definition of minimum requirements for the accreditation of the same laboratories. The model most frequently used for quality management is represented by the ISO 9000: Vision 2000, that is a management model with specific reference to the organization and the customer satisfaction. The model applied to the health structure needs a rapid change in mentality that addresses the operators to define, share and achieve objectives to be brought on by means of an active collaboration, group activity and deep sense of belonging necessary to the attainment of expected objectives. When the model is applied by a scientific society, it is necessary to take into account the different structural and functional organization, the constitution and the operators differing on the point of view of origin, experiences, mentality, and roles. The ISO 9000: Vision 2000 model can be applied also to the cardiovascular echo laboratory which may be compared to a simple organization; for its corrected functioning, SIEC has defined minimal requirements for the accreditation, realization and modalities to carry out and manage quality. The quality system represents a new way of operating of an

  14. Quality Management of Biorepositories

    PubMed Central

    Gunter, Elaine W.; Sexton, Katherine C.; Bell, Walter C.

    2015-01-01

    Biomedical investigators require high quality human tissue to support their research; thus, an important aspect of the provision of tissues by biorepositories is the assurance of high quality and consistency of processing specimens. This is best accomplished by a quality management system (QMS). This article describes the basis of a QMS program designed to aid biorepositories that want to improve their operations. In 1983, the UAB Tissue Collection and Biobanking Facility (TCBF) introduced a QMS program focused on providing solid tissues to support a wide range of research; this QMS included a quality control examination of the specific specimens provided for research. Similarly, the Division of Laboratory Sciences at the Centers for Disease Control and Prevention (CDC) introduced a QMS program for their laboratory analyses, focused primarily on bodily fluids. The authors of this article bring together the experience of the QMS programs at these two sites to facilitate the development or improvement of quality management systems of a wide range of biorepositories. PMID:26035008

  15. Air quality risk management.

    PubMed

    Williams, Martin L

    2008-01-01

    Rather than attempt to provide a comprehensive account of air quality risk assessment, as might be found in a textbook or manual, this article discusses some issues that are of current importance in the United Kingdom and the rest of Europe, with special emphasis on risk assessment in the context of policy formulation, and emerging scientific knowledge. There are two pollutants of particular concern and that both pose challenges for risk assessment and policy, and they are particulate matter (PM) and ozone. The article describes some issues for health risk assessment and finally some forward-looking suggestions for future approaches to air quality management.

  16. Quality Management Program

    SciTech Connect

    Not Available

    1991-10-01

    According to {section} 35.32, Quality Management Program,'' of 10 CFR Part 35, Medical Use of Byproduct Material,'' applicants or licensees, as applicable, are required to establish a quality management (QM) program. This regulatory guide provides guidance to licensees and applicants for developing policies and procedures for the QM program. This guide does not restrict or limit the licensee from using other guidance that may be equally useful in developing a QM program, e.g., information available from the Joint Commission on Accreditation of Healthcare Organizations or the American College of Radiology. Any information collection activities mentioned in this regulatory guide are contained as requirements in 10 CFR Part 35, which provides the regulatory basis for this guide. This information collection requirements in 10 CFR Part 35 have been cleared under OMB Clearance No. 3150-0010.

  17. A Model for Technovocational School-Based Curriculum Planning and Evaluation under the Framework of Total Quality Management.

    ERIC Educational Resources Information Center

    Wang, Yen-Zen

    In the current climate of rapid technological advance and social value change, many have suggested that schools should use a school-based approach to curriculum planning. How to design such a curriculum in order to train graduates suited for employment has become an important issue. Many domestic and international enterprises have successfully…

  18. Cesium legacy safety project management work plan

    SciTech Connect

    Durham, J.S.

    1998-04-21

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell).

  19. Managing quality and compliance.

    PubMed

    McNeil, Alice; Koppel, Carl

    2015-01-01

    Critical care nurses assume vital roles in maintaining patient care quality. There are distinct facets to the process including standard setting, regulatory compliance, and completion of reports associated with these endeavors. Typically, multiple niche software applications are required and user interfaces are varied and complex. Although there are distinct quality indicators that must be tracked as well as a list of serious or sentinel events that must be documented and reported, nurses may not know the precise steps to ensure that information is properly documented and actually reaches the proper authorities for further investigation and follow-up actions. Technology advances have permitted the evolution of a singular software platform, capable of monitoring quality indicators and managing all facets of reporting associated with regulatory compliance.

  20. Management Planning: Innovation on Campus.

    ERIC Educational Resources Information Center

    Hall, Stephen S. J.

    1973-01-01

    Management planning is a body of concepts and techniques designed to facilitate the analytical and forecasting processes within a department, to increase the decision-making prerogatives of the department director within predetermined guidelines, and to encourage and reinforce communication both among the departments and between the departments…

  1. Niagara River Toxics Management Plan

    EPA Pesticide Factsheets

    This 2007 Progress Report of the Niagara River Toxics Management Plan (NRTMP) summarizes progress made by the four parties in dealing with the 18 “Priority Toxics” through reductions in point and non-point sources to the Niagara River.

  2. Management Planning: Innovation on Campus.

    ERIC Educational Resources Information Center

    Hall, Stephen S. J.

    1973-01-01

    Management planning is a body of concepts and techniques designed to facilitate the analytical and forecasting processes within a department, to increase the decision-making prerogatives of the department director within predetermined guidelines, and to encourage and reinforce communication both among the departments and between the departments…

  3. Planning and Implementing Total Quality Management in the Royal Australian Air Force: A Multiple Case Study Analysis

    DTIC Science & Technology

    1990-09-01

    Theory of Constraints. Goldratt has developed a continuous improvement process model called the Theory of Constraints (TOC). Goldratt suggests using...management philosophy; however, in the context of this discussion, TOC will be referred to as a continuous improvement model. Actually, Goldratt does...not distinguish between TQM and TOC, but views these approaches as having identical goals and promoting a similar management philosophy ( Goldratt , 1990

  4. Air Quality Management Process Cycle

    EPA Pesticide Factsheets

    Air quality management are activities a regulatory authority undertakes to protect human health and the environment from the harmful effects of air pollution. The process of managing air quality can be illustrated as a cycle of inter-related elements.

  5. Hanford Environmental Management Program Plan

    SciTech Connect

    DeFigh-Price, C.

    1989-09-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office (DOE-RL). Westinghouse Hanford Company (WHC) has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as reporting and planning and to facilitate compliance with environmental regulations. This document describes the scope of work funded by this program for Fiscal Year (FY) 1990, presents the prioritized tasks covered, the management structure in place and the assessment allocation methodology used to determine the FY 1990 assessments. 15 refs., 3 figs., 2 tabs.

  6. Quality Assurance Planning for Region 6

    EPA Pesticide Factsheets

    The ultimate success of an environmental program or project depends on the quality of the environmental data collected and used in decision-making. EPA has developed guidances to help state and tribal governments develop Quality Assurance Program Plans.

  7. Quality Assurance Planning for Region 9

    EPA Pesticide Factsheets

    The ultimate success of an environmental program or project depends on the quality of the environmental data collected and used in decision-making. EPA has developed guidances to help state and tribal governments develop Quality Assurance Program Plans.

  8. Forest Resource Management Plans: A Sustainability Approach

    ERIC Educational Resources Information Center

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  9. Forest Resource Management Plans: A Sustainability Approach

    ERIC Educational Resources Information Center

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  10. References on EPA Quality Assurance Project Plans

    EPA Pesticide Factsheets

    Provides requirements for the conduct of quality management practices, including quality assurance (QA) and quality control (QC) activities, for all environmental data collection and environmental technology programs performed by or for this Agency.

  11. Environmental Restoration Program Management Control Plan

    SciTech Connect

    Not Available

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives.

  12. Strategic plan for Hanford site information management

    SciTech Connect

    1994-09-01

    The Hanford Site missions are to clean up the Site, to provide scientific knowledge and technology to meet global needs, and to partner in the economic diversification of the region. To achieve these long-term missions and increase confidence in the quality of the Site`s decision making process, a dramatically different information management culture is required, consistent with US Department of Energy (DOE) mandates on increased safety, productivity, and openness at its sites. This plan presents a vision and six strategies that will move the Site toward an information management culture that will support the Site missions and address the mandates of DOE.

  13. 42 CFR 423.153 - Drug utilization management, quality assurance, and medication therapy management programs (MTMPs).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 3 2012-10-01 2012-10-01 false Drug utilization management, quality assurance, and... Drug utilization management, quality assurance, and medication therapy management programs (MTMPs). (a... D plan, a drug utilization management program, quality assurance measures and systems, and an...

  14. 42 CFR 423.153 - Drug utilization management, quality assurance, and medication therapy management programs (MTMPs).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 3 2013-10-01 2013-10-01 false Drug utilization management, quality assurance, and... Drug utilization management, quality assurance, and medication therapy management programs (MTMPs). (a... D plan, a drug utilization management program, quality assurance measures and systems, and an...

  15. 42 CFR 423.153 - Drug utilization management, quality assurance, and medication therapy management programs (MTMPs).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 3 2014-10-01 2014-10-01 false Drug utilization management, quality assurance, and... Drug utilization management, quality assurance, and medication therapy management programs (MTMPs). (a... D plan, a drug utilization management program, quality assurance measures and systems, and an...

  16. Data and information quality strategic plan.

    PubMed

    Bethell, C

    The Environmental Protection Agency's Strategic Plan was developed in response to internal and external concerns about the integrity, consistency, and accuracy of EPA's environmental data. This document explains why a Strategic Plan is needed and the methodology used in its development, cites Agency models of excellence, and presents the six recommendations of EPA's Data and Information Quality Strategic Plan.

  17. Integrating quality, safety, and environment management systems.

    PubMed

    Winder, C

    1997-01-01

    Internationally consistent ISO standards are in use, or are being developed, for quality systems, environmental management, and occupational health and safety. These standards outline a model for the management of quality, environment or safety. In many respects the process of developing management systems for these matters contains a number of common elements, including obtaining commitment from senior management; instituting consultative mechanisms; developing a policy; identifying components of the management program; resourcing, implementing, and reviewing the program; and integrating the program into the organization's strategic plan. The necessity of developing separate management systems for different organizational aspects is wasteful and inefficient. Better management systems will be developed if they are integrated into a single management structure.

  18. The Art Institutes' Default Management Plan.

    ERIC Educational Resources Information Center

    Mazur, William J.; Blackmun, Ellen V.

    1989-01-01

    Describes the student loan default management plan of the Art Institutes. The plan includes a student financial plan worksheet, a student financial planner, and activities for students regarding their loan responsibilities. (JOW)

  19. Effective planning for managed care.

    PubMed

    Koeppen, L L; Mess, M A; Trott, K J

    1995-11-01

    In response to the changing healthcare market, many providers are forming networks for managed care contracting. These networks may fail, however, if planning focuses on maintaining business practices of the past rather than responding to market forces of the future. Effective planning for managed care requires that network executives establish a vision of the future that is not shackled by experiences of the past, articulate a mission that outlines what the network's role will be in the future, and create strategies that will help the network fulfill its mission. Although financial data are necessary to measure a network's progress toward fulfilling its mission, data on past performance should not be used to shape a vision of the future.

  20. The Development of a Total Quality Management Plan for David Grant USAF Medical Center Travis Air Force Base, California

    DTIC Science & Technology

    1991-12-01

    AUTHOR (S) WITT, BRIAN, KENDALL 13a. TYPE OF REPORT 13b. TIME COVERED 14. DATE OF REPORT (YearMonthDay) IS. PAGE COUNT FINAL FROM 7-90 TO 7-91...One author points out that "The DOD has mandated that you implement in military health care a TOM program. TOM has a strong foot hold. The philosophy... author , "It (TOM) is officially the management style of the Department of Defense" (Harben, 1989, p. 3). The Department of the Air Force has issued very

  1. Total Quality Management in Construction

    DTIC Science & Technology

    1993-08-01

    Non M-M to TOTAL QUALITY MANAGEMENT IN CONSTRUCTION Icc I FCHARLES C. MILLER I A REPORT PRESENTED TO THE GRADUATE COMMIITTEE OF THE DEPARTMENT OF...Ii I I TOTAL QUALITY MANAGEMENT IN CONSTRUCTION I I BY CHARLES C. MILLER A REPORT PRESENTED TO THE GRADUATE COMMITTEE OF THE DEPARTMENT OF CIVIL...Figures iii Introduction 1 Chapter 1 - Defining Total Quality Management 4 Philosophy 4 The Team Concept 20 Quality Improvement Process 27 Chapter 2

  2. Suicide Management Plan--Post Suicide Response.

    ERIC Educational Resources Information Center

    Imhoff, Robert; Royster, Sharon

    This document contains a suicide management plan developed specifically for colleges. The suicide management plan described includes pre-planning, immediate response to the event, press releases, college staff jobs, college responses (such as memorials or scholarships), interaction with the family, and staff counseling. The plan is presented as a…

  3. Suicide Management Plan--Post Suicide Response.

    ERIC Educational Resources Information Center

    Imhoff, Robert; Royster, Sharon

    This document contains a suicide management plan developed specifically for colleges. The suicide management plan described includes pre-planning, immediate response to the event, press releases, college staff jobs, college responses (such as memorials or scholarships), interaction with the family, and staff counseling. The plan is presented as a…

  4. 76 FR 77739 - Approval and Promulgation of Air Quality Implementation Plans; Massachusetts and New Hampshire...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-14

    ... comments to: Anne Arnold, Manager, Air Quality Planning Unit, Office of Ecosystem Protection, U.S... INFORMATION CONTACT: Richard P. Burkhart, Air Quality Planning Unit, U.S. Environmental Protection Agency, EPA... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Massachusetts...

  5. Integrating fire management analysis into land management planning

    Treesearch

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  6. Solid Waste Management Plan. Revision 4

    SciTech Connect

    1995-04-26

    The waste types discussed in this Solid Waste Management Plan are Municipal Solid Waste, Hazardous Waste, Low-Level Mixed Waste, Low-Level Radioactive Waste, and Transuranic Waste. The plan describes for each type of solid waste, the existing waste management facilities, the issues, and the assumptions used to develop the current management plan.

  7. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 31 2011-07-01 2011-07-01 false Management plans. 763.93 Section 763... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including...

  8. Total Quality Management (TQM)

    DTIC Science & Technology

    1989-09-01

    Business Planning Team. Develops NAVSEA Strategic Business Plan via environmental scan, identification of key issues, strategies, goals, objectives and...review meetings. Is a member of the NAVSEA 07 Business Planning Team. TOM Office. Issues/provides the final Shipyard Operations Plan for each fiscal

  9. SAPHIRE 8 Software Quality Assurance Plan

    SciTech Connect

    Curtis Smith

    2010-02-01

    This Quality Assurance (QA) Plan documents the QA activities that will be managed by the INL related to JCN N6423. The NRC developed the SAPHIRE computer code for performing probabilistic risk assessments (PRAs) using a personal computer (PC) at the Idaho National Laboratory (INL) under Job Code Number (JCN) L1429. SAPHIRE started out as a feasibility study for a PRA code to be run on a desktop personal PC and evolved through several phases into a state-of-the-art PRA code. The developmental activity of SAPHIRE was the result of two concurrent important events: The tremendous expansion of PC software and hardware capability of the 90s and the onset of a risk-informed regulation era.

  10. 77 FR 12524 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead... Management (IDEM) on November 24, 2010, to revise the Indiana State Implementation Plan (SIP) for lead (Pb...

  11. From strategic planning to TQM: a complete management approach.

    PubMed

    Bader, S A; Braude, R M

    1995-09-01

    Organizations can no longer rely on a single management solution as they respond to a complex world. Biomedical communications managers need to employ a variety of management tools as they cope with a rapidly changing landscape and an increasing set of business pressures. This article describes two management strategies, strategic planning and total quality management, which can be used to achieve success in the 21st century.

  12. Transuranic Waste Characterization Quality Assurance Program Plan

    SciTech Connect

    1995-04-30

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes.

  13. Total Quality Management in Higher Education.

    ERIC Educational Resources Information Center

    Rieley, James B.

    In order for an educational institution to utilize Total Quality Management as a tool for improving effectiveness, the culture of the college must foster a belief in change and a focus on the customer. A disciplined approach to planning and a commitment to the concept of Continuous Improvement (CI) are also required. Concerning acceptance of…

  14. ICDF Complex Operations Waste Management Plan

    SciTech Connect

    W.M. Heileson

    2006-12-01

    This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

  15. Strategic service quality management for health care.

    PubMed

    Anderson, E A; Zwelling, L A

    1996-01-01

    Quality management has become one of the most important and most debated topics within the service sector. This is especially true for health care, as the controversy rages on how the existing American system should be restructured. Health care reform aimed at reducing costs and ensuring access to all Americans cannot be allowed to jeopardize the quality of care. As such, total quality management (TQM) has become a vital ingredient to strategic planning within the health care domain. At the heart of any such quality improvement effort is the issue of measurement. TQM cannot be effectively utilized as a competitive weapon unless quality can be accurately defined, measured, evaluated, and monitored over time. Through such analysis a hospital can elect how to expend its limited resources toward those quality improvement projects which will impact customer perceptions of service quality the most. Thus, the purpose of this report is to establish a framework by which to approach the issue of quality measurement, delineate the various components of quality that exist in health care, and explore how these elements affect one another. We propose that the issue of quality measurement in health care be approached as an integration of service quality attributes common to other service organizations and technical quality attributes unique to health care. We hope that this research will serve as a first step toward the synthesis of the various quality attributes inherent in the health care domain and encourage other researchers to address the interactions of the various quality attributes.

  16. Total Quality Management (TQM) Bibliography

    DTIC Science & Technology

    1990-04-01

    GTE FIE COPY DTIC c" ECTE 8JUL 25 1990u TOTAL QUALITY MANAGEMENT (TQM) BIBLIOGRAPHY APRIL-1990 Jointly supported by __’__________-_________ Jointly...Arsenal, AL 35898-5241 1I. TITLE (Include Security Classification) TOTAL QUALITY MANAGEMENT (TQM) BIBL IRAPHY APRIL-1990 12. PERSONAL AUTHOR(S) Knott...implementation of the concept of total quality management (TQM). The selected coverage includes books, periodical articles, conference papers and reports. Coded

  17. Overview of the Hanford risk management plan

    SciTech Connect

    Halverson, T.G.

    1998-03-26

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context.

  18. Cross-National Studies of the Quality of Education: Planning Their Design and Managing Their Impact (Paris, France, June 17-18, 2004)

    ERIC Educational Resources Information Center

    Ross, Kenneth N., Ed.; Genevois, Ilona Jurgens, Ed.

    2006-01-01

    There has been a worldwide growth of interest among governments and international agencies in cross-national studies of the quality of education. However, such studies require careful planning, and have far-reaching implications for all concerned. Ministries of education should only become involved if they are prepared to actively engage in…

  19. 222-S Laboratory Quality Assurance Plan. Revision 1

    SciTech Connect

    Meznarich, H.K.

    1995-07-31

    This Quality Assurance Plan provides,quality assurance (QA) guidance, regulatory QA requirements (e.g., 10 CFR 830.120), and quality control (QC) specifications for analytical service. This document follows the U.S Department of Energy (DOE) issued Hanford Analytical Services Quality Assurance Plan (HASQAP). In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. Quality assurance elements required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAMS-004) and Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (QAMS-005) from the US Environmental Protection Agency (EPA) are covered throughout this document. A quality assurance index is provided in the Appendix A. This document also provides and/or identifies the procedural information that governs laboratory operations. The personnel of the 222-S Laboratory and the Standards Laboratory including managers, analysts, QA/QC staff, auditors, and support staff shall use this document as guidance and instructions for their operational and quality assurance activities. Other organizations that conduct activities described in this document for the 222-S Laboratory shall follow this QA/QC document.

  20. Strategic Planning and Market-Driven Management for Career Centers.

    ERIC Educational Resources Information Center

    Chonko, Lawrence B.; Burley, Elizabeth

    1992-01-01

    Asserts that, when university career center pursues a strategic plan and becomes market driven, it is not only perceived to be a quality organization, it is one. Explains philosophy of market-driven management, marketing concept, and implementation of market-driven career planning and placement center. (NB)

  1. Quality assurance program plan fuel supply shutdown

    SciTech Connect

    Metcalf, I.L.

    1998-09-21

    This Quality Assurance Program plan (QAPP) describes how the Fuel Supply Shutdown (FSS) project organization implements the quality assurance requirements of HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) and the B and W Hanford Company Quality Assurance Program Plan (QAPP), FSP-MP-004. The QAPP applies to facility structures, systems, and components and to activities (e.g., design, procurement, testing, operations, maintenance, etc.) that could affect structures, systems, and components. This QAPP also provides a roadmap of applicable Project Hanford Policies and Procedures (PHPP) which may be utilized by the FSS project organization to implement the requirements of this QAPP.

  2. Quality Assurance Project Plan Development Tool

    EPA Pesticide Factsheets

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  3. UMTRA technical assistance contractor quality assurance program plan

    SciTech Connect

    Not Available

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements.

  4. Medical technology management: from planning to application.

    PubMed

    David, Y; Jahnke, E

    2005-01-01

    Appropriate deployment of technological innovation contributes to improvement in the quality of healthcare delivered, the containment of cost, and access to the healthcare system. Hospitals have been allocating a significant portion of their resources to procuring and managing capital assets; they are continuously faced with demands for new medical equipment and are asked to manage existing inventory for which they are not well prepared. To objectively manage their investment, hospitals are developing medical technology management programs that need pertinent information and planning methodology for integrating new equipment into existing operations as well as for optimizing costs of ownership of all equipment. Clinical engineers can identify technological solutions based on the matching of new medical equipment with hospital's objectives. They can review their institution's overall technological position, determine strengths and weaknesses, develop equipment-selection criteria, supervise installations, train users and monitor post procurement performance to assure meeting of goals. This program, together with cost accounting analysis, will objectively guide the capital assets decision-making process. Cost accounting analysis is a multivariate function that includes determining the amount, based upon a strategic plan and financial resources, of funding to be allocated annually for medical equipment acquisition and replacement. Often this function works closely with clinical engineering to establish equipment useful life and prioritization of acquisition, upgrade, and replacement of inventory within budget confines and without conducting time consuming, individual financial capital project evaluations.

  5. CCSF Management Plan, 2002/2003.

    ERIC Educational Resources Information Center

    City Coll. of San Francisco, CA.

    This is the 2001-2002 management plan for the City College of San Francisco (CCSF), California. The plan contains the following sections: (1) Overview of Planning and Budgeting; (2) Vision, Values, and Mission; (3) College Goals and Strategic Priorities; (4) Annual Institutional Plan CCSF 2002-03; (5) College Core Performance Indicators; and (6)…

  6. Instruments for Water Quality Management

    ERIC Educational Resources Information Center

    United Nations and Water, 1977

    1977-01-01

    The old system of licensing within the different sectors of the society in Norway is in the process of being incorporated into a system of total natural resource planning and regulation. This article outlines comprehensive physical and economic water pollution management plans for the municipality, the county, and the state. (Author/MA)

  7. Near Facility Environmental Monitoring Quality Assurance Project Plan

    SciTech Connect

    MCKINNEY, S.M.

    2000-05-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards.

  8. Internal versus External Quality Management

    ERIC Educational Resources Information Center

    Hofman, Roelande H.; Dijkstra, Nynke J.; Hofman, W. H. Adriaan

    2008-01-01

    This article presents the findings of research into quality management in Dutch elementary schools using theories of school accountability and school improvement as fundamentals. The study is based on data gathered from almost 1000 school leaders. It attempts to determine whether different types of quality management exist in primary schools.…

  9. Internal versus External Quality Management

    ERIC Educational Resources Information Center

    Hofman, Roelande H.; Dijkstra, Nynke J.; Hofman, W. H. Adriaan

    2008-01-01

    This article presents the findings of research into quality management in Dutch elementary schools using theories of school accountability and school improvement as fundamentals. The study is based on data gathered from almost 1000 school leaders. It attempts to determine whether different types of quality management exist in primary schools.…

  10. Approved Air Quality Implementation Plans in Region 10

    EPA Pesticide Factsheets

    Landing page for information about EPA-approved air quality State Implementation Plans (SIPs), Tribal Implementation Plans (TIPs), and Federal Implementation Plans (FIPs) in Alaska, Idaho, Oregon, Washington.

  11. Quality management of finite element analysis

    NASA Astrophysics Data System (ADS)

    Barlow, John

    1991-09-01

    A quality management system covering the use of finite element analysis is described. The main topics are as follows: acquisition, development and verification of software (including the software suppliers software quality control system), support, documentation, error control, internal software, software acceptance and release; development and qualification of analysis methods, including software evaluation, analysis procedure qualification and documentation, procedure quality checks, control of analysis procedure errors; product design and integrity analysis, including project quality assurance and analysis planning, task specification and allocation, analysis, execution, results checking and analysis records. Other issues include the commercial and business advantages of quality systems, project and technical management and the training and experience of personnel. The items are correlated with the requirements of International Standard Organization 9001.

  12. Air Pollution Monitoring | Air Quality Planning & Standards ...

    EPA Pesticide Factsheets

    2016-06-08

    The basic mission of the Office of Air Quality Planning and Standards is to preserve and improve the quality of our nation's air. To accomplish this, OAQPS must be able to evaluate the status of the atmosphere as compared to clean air standards and historical information.

  13. Oak Ridge Reservation Waste Management Plan

    SciTech Connect

    Turner, J.W.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  14. Spent Nuclear Fuel project, project management plan

    SciTech Connect

    Fuquay, B.J.

    1995-10-25

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  15. FY 2015 - Stockpile Stewardship and Management Plan

    SciTech Connect

    2014-04-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  16. FY 2016 - Stockpile Stewardship and Management Plan

    SciTech Connect

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  17. Oak Ridge National Laboratory Waste Management Plan

    SciTech Connect

    Not Available

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  18. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    SciTech Connect

    Fix, N. J.

    2008-03-12

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  19. Defense System Software Management Plan

    DTIC Science & Technology

    1976-03-01

    quality assurance discipline " Lack of quantitative data base for feedback of "lessons learned" 2. Actions to be Taken a. Service policies will be...and identify where they could be improved. Feedback from the field will be incorporated in updated versions of the guidelines and a cor cinued...c~0 .00 0 u 0 Efl ) 0 0 H 11-4 " . 00 oo Wro o,_ U ) z I QI- (n 0 0~ wH 000 1-5 MANAGEMENT PRACTICE AND PROCEDURE The action vehicle envf.sioned for

  20. Nurse manager succession planning: a concept analysis.

    PubMed

    Titzer, Jennifer L; Shirey, Maria R

    2013-01-01

    The current nursing leadership pipeline is inadequate and demands strategic succession planning methods. This article provides concept clarification regarding nurse manager succession planning. Attributes common to succession planning include organizational commitment and resource allocation, proactive and visionary leadership approach, and a mentoring and coaching environment. Strategic planning, current and future leadership analysis, high-potential identification, and leadership development are succession planning antecedents. Consequences of succession planning are improved leadership and organizational culture continuity, and increased leadership bench strength. Health care has failed to strategically plan for future leadership. Developing a strong nursing leadership pipeline requires deliberate and strategic succession planning. © 2013 Wiley Periodicals, Inc.

  1. TQM (Total Quality Management) SPARC (Special Process Action Review Committees) Handbook

    DTIC Science & Technology

    1989-08-01

    improvement; Logistics information; Process analysis; Quality control; Quality assurance; Total Quality Management ; Statistical processes; Management Planning and control; Management training; Management information systems.... Quality Management (TQM). It includes concepts and definitions, checklists, sample formats, and assessment criteria. Keywords: Continuous process...This document describes the techniques used to support and guide the Special Process Action Review Committees for accomplishing their goals for Total

  2. Building air quality: Action plan, June 1998

    SciTech Connect

    1998-11-01

    To promote the use of these straightforward practices to improve IAQ, EPA and other leaders in the IAQ field developed this 8-step plan. This additional resource meets the needs of building owners and managers who want an easy-to-understand path for taking their building from current conditions and practices to the successful institutionalization of good IAQ management practices.

  3. Total Quality Management for Schools.

    ERIC Educational Resources Information Center

    Greenwood, Malcolm S.; Gaunt, Helen J.

    Education in the United Kingdom has been shaped by the advent of local school management and the rapid growth of grant-maintained schools. Total Quality Management (TQM) offers a new way of looking at management principles and structures by identifying the needs of both internal and external customers. This book applies principles of TQM…

  4. Total Quality Management for Schools.

    ERIC Educational Resources Information Center

    Greenwood, Malcolm S.; Gaunt, Helen J.

    Education in the United Kingdom has been shaped by the advent of local school management and the rapid growth of grant-maintained schools. Total Quality Management (TQM) offers a new way of looking at management principles and structures by identifying the needs of both internal and external customers. This book applies principles of TQM…

  5. Implementing Total Quality Management in a University Setting.

    ERIC Educational Resources Information Center

    Coate, L. Edwin

    1991-01-01

    Oregon State University implemented Total Quality Management in nine phases: exploration; establishing a pilot study team; defining customer needs; adopting the breakthrough planning process; performing breakthrough planning in divisions; forming daily management teams; initiating cross-functional pilot projects; implementing cross-functional…

  6. Implementing Total Quality Management in a University Setting.

    ERIC Educational Resources Information Center

    Coate, L. Edwin

    1991-01-01

    Oregon State University implemented Total Quality Management in nine phases: exploration; establishing a pilot study team; defining customer needs; adopting the breakthrough planning process; performing breakthrough planning in divisions; forming daily management teams; initiating cross-functional pilot projects; implementing cross-functional…

  7. Gas generation matrix depletion quality assurance project plan

    SciTech Connect

    1998-05-01

    The Los Alamos National Laboratory (LANL) is to provide the necessary expertise, experience, equipment and instrumentation, and management structure to: Conduct the matrix depletion experiments using simulated waste for quantifying matrix depletion effects; and Conduct experiments on 60 cylinders containing simulated TRU waste to determine the effects of matrix depletion on gas generation for transportation. All work for the Gas Generation Matrix Depletion (GGMD) experiment is performed according to the quality objectives established in the test plan and under this Quality Assurance Project Plan (QAPjP).

  8. Total quality management implementation guidelines

    SciTech Connect

    Not Available

    1993-12-01

    These Guidelines were designed by the Energy Quality Council to help managers and supervisors in the Department of Energy Complex bring Total Quality Management to their organizations. Because the Department is composed of a rich mixture of diverse organizations, each with its own distinctive culture and quality history, these Guidelines are intended to be adapted by users to meet the particular needs of their organizations. For example, for organizations that are well along on their quality journeys and may already have achieved quality results, these Guidelines will provide a consistent methodology and terminology reference to foster their alignment with the overall Energy quality initiative. For organizations that are just beginning their quality journeys, these Guidelines will serve as a startup manual on quality principles applied in the Energy context.

  9. Research and development quality assurance planning

    SciTech Connect

    Hoke, P.B.

    1990-05-14

    Planning for quality assurance (QA) in research and development (R D) is like stealing eggs without waking up the chickens. The QA program should be as unobtrusive as possible. Researchers require a QA program that affords them an environment capable of supporting repeatable experiments with accurate data without unduly stifling their creative abilities. Careful advance planning ensures that the intensity of control provided by quality-related systems is commensurate with the importance and scope of the activities being performed. Good scientific practices applied to small bench-scale projects may require minimal additional controls. As projects increase in size and complexity the controls imposed through planning must, by necessity, be increased. Research and development QA planning, just like any other planning, involves all affected individuals. The application of control systems is determined by factors such as customer or sponsor requirements, the importance of an item or activity to the experiment's success, and the organizational complexity of the project. Many larger experiments are highly dependent on quality-related support activities such as calibration, engineering design, and inspection provided by organizations outside the R D group. Since, in most cases, the expense of support activities is taken directly from funds available for research, it is important for the researchers to be involved in the planning efforts to help determine and agree with the level of QA effort required. A single plan will often suffice for organizations engaged in large numbers of similar experiments. Complex experiments may require unique QA plans or additions to existing plans. Once implemented, the R D QA plans, like any others, require audits or surveillances and may require revisions if the scope of the experiment changes. 1 ref., 1 fig.

  10. What is an Integrated Waste Management Plan

    EPA Pesticide Factsheets

    This document describes the Integrated Waste Management Plans (IWMPs) as an efficient and cost-effective way to reduce open dumping, effectively manage solid waste, and protect human health and the environment.

  11. Total Quality Management in a Knowledge Management Perspective.

    ERIC Educational Resources Information Center

    Johannsen, Carl Gustav

    2000-01-01

    Presents theoretical considerations on both similarities and differences between information management and knowledge management and presents a conceptual model of basic knowledge management processes. Discusses total quality management and quality control in the context of information management. (Author/LRW)

  12. Total Quality Management in a Knowledge Management Perspective.

    ERIC Educational Resources Information Center

    Johannsen, Carl Gustav

    2000-01-01

    Presents theoretical considerations on both similarities and differences between information management and knowledge management and presents a conceptual model of basic knowledge management processes. Discusses total quality management and quality control in the context of information management. (Author/LRW)

  13. NASA total quality management 1989 accomplishments report

    NASA Technical Reports Server (NTRS)

    Tai, Betty P. (Editor); Stewart, Lynne M. (Editor)

    1990-01-01

    NASA and contractor employees achieved many notable improvements in 1989. The highlights of those improvements, described in this seventh annual Accomplishments Report, demonstrate that the people who support NASA's activities are getting more involved in quality and continuous improvement efforts. Their gains solidly support NASA's and this Nation's goal to remain a leader in space exploration and in world-wide market competition, and, when communicated to others through avenues such as this report, foster improvement efforts across government and industry. The principles in practice which led to these process refinements are important cultural elements to any organization's productivity and quality efforts. The categories in this report reflect NASA principles set forth in the 1980's and are more commonly known today as Total Quality Management (TQM): top management leadership and support; strategic planning; focus on the customer; employee training and recognition; employee empowerment and teamwork; measurement and analysis; and quality assurance.

  14. Total quality environmental management: Integrating environmental and quality management systems

    SciTech Connect

    Carley, J.A.; Kubala, G.; Hudson, T.

    1996-11-01

    As the oilfield industry strives to globally sustain continuous movement of environmental and quality performance, companies have come to realize Total Quality Environmental Management (TQEM) is essential in product research, development manufacturing and services. As our industry endeavors to continuously improve, more emphasis is being placed upon the management systems we apply such as ISO 14000 and ISO 9000. These standards are tools for improving environmental and quality performance, meeting customer requirements, and increasing profitability. lbs paper presents actual examples of the successful integration of environmental and quality management systems into an operational TQEM system. Also presented are pilot study evaluations of the draft ISO 14000 standards by two certified ISO 9000 facilities. Examples of continuous improvement and cross-functional teams as means to merge environment and quality management into the functions of process control, corrective and preventive action, document control, and waste management are presented. Results and improvements from facilities involved with TQEM discussed along with their strategies and progress in consolidating the environmental and quality programs into a single, viable management system. The case histories from various facilities demonstrate the implementation of TQEM and in TQEM promotes a cleaner environment, reduces costs, con- serves energy and raw materials, minimizes pollutants and wastes, and reduces redundant paperwork.

  15. 48 CFR 37.604 - Quality assurance surveillance plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans are in Subpart 46.4. The Government may either prepare the quality assurance surveillance plan or require the offerors to submit a proposed quality assurance surveillance plan for the Government's...

  16. Sport Facility Planning and Management. Sport Management Library.

    ERIC Educational Resources Information Center

    Farmer, Peter J.; Mulrooney, Aaron L.; Ammon, Rob, Jr.

    Students of sports facilities management will need to acquire a wide variety of managerial skills and knowledge in order to be adequately prepared to plan and manage these facilities. This textbook offers students a mix of practical examples and recognized theory to help them in the planning, constructing, promoting, and managing of sports…

  17. Sport Facility Planning and Management. Sport Management Library.

    ERIC Educational Resources Information Center

    Farmer, Peter J.; Mulrooney, Aaron L.; Ammon, Rob, Jr.

    Students of sports facilities management will need to acquire a wide variety of managerial skills and knowledge in order to be adequately prepared to plan and manage these facilities. This textbook offers students a mix of practical examples and recognized theory to help them in the planning, constructing, promoting, and managing of sports…

  18. Butte County Air Quality Management District Stationary Source Permits

    EPA Pesticide Factsheets

    U.S. EPA Public Notice: EPA is finalizing action on three permitting rules submitted as a revision to the Butte County Air Quality Management District (BCAQMD) portion of the California State Implementation Plan (SIP).

  19. Mendocino County Air Quality Management District Stationary Source Permits

    EPA Pesticide Factsheets

    The Environmental Protection Agency (EPA) is proposing action on four permitting rules submitted as a revision to the Mendocino County Air Quality Management District (“MCAQMD” or “the District”) portion of the applicable state implementation plan (SIP).

  20. Mendocino County Air Quality Management District; Stationary Source Permits

    EPA Pesticide Factsheets

    EPA is finalizing action on four permitting rules submitted as a revision to the Mendocino County Air Quality Management District portion of the applicable state implementation plan (SIP) for the State of California.

  1. Total Quality Management and Cost of Quality

    NASA Astrophysics Data System (ADS)

    Hadjicostas, Evsevios

    Before we start analysing the philosophy of Total Quality Management it is worthwhile going back to the early days of quality and the quality movement. In fact, the quality concept dates back to the creation of Adam and Eve: “And God saw every thing that he had made, and, behold, it was very good”. (Genesis A 31). It is remarkable that at the end of each day, looking at his creations God was saying, “This is good”. However, at the end of the sixth day, after he finished the creation of human beings, he said, “This is very good”. It is amazing that he did not say, “This is excellent”. This is because excellence is something that we gain after tireless effort. God left room for improvement in order to challenge us and make our life more attractive, which has really happened!

  2. Nutrient Management Certification for Delaware: Developing a Water Quality Curriculum

    ERIC Educational Resources Information Center

    Hansen, David J.; Binford, Gregory D.

    2004-01-01

    Water quality is a critical environmental, social, and political issue in Delaware. In the late 1990s, a series of events related to water quality issues led to the passage of a state nutrient management law. This new law required nutrient management planning and established a state certification program for nutrient users in the agricultural and…

  3. Implementing Total Quality Management: A Model for Research Libraries.

    ERIC Educational Resources Information Center

    Barnard, Susan B.

    1993-01-01

    Describes a model of Total Quality Management (TQM) developed by the Association of Research Libraries. The issues, elements and processes of a comprehensive TQM-based transition, including commitment by management, linkage to organizational strategic planning, organizational culture, understanding customers, and quality teams are covered.…

  4. Nutrient Management Certification for Delaware: Developing a Water Quality Curriculum

    ERIC Educational Resources Information Center

    Hansen, David J.; Binford, Gregory D.

    2004-01-01

    Water quality is a critical environmental, social, and political issue in Delaware. In the late 1990s, a series of events related to water quality issues led to the passage of a state nutrient management law. This new law required nutrient management planning and established a state certification program for nutrient users in the agricultural and…

  5. Implementing Total Quality Management: A Model for Research Libraries.

    ERIC Educational Resources Information Center

    Barnard, Susan B.

    1993-01-01

    Describes a model of Total Quality Management (TQM) developed by the Association of Research Libraries. The issues, elements and processes of a comprehensive TQM-based transition, including commitment by management, linkage to organizational strategic planning, organizational culture, understanding customers, and quality teams are covered.…

  6. Managing Air Quality - Emissions Inventories

    EPA Pesticide Factsheets

    This page describes the role of emission inventories in the air quality management process, a description of how emission inventories are developed, and where U.S. emission inventory information can be found.

  7. Solid Waste Management Planning--A Methodology

    ERIC Educational Resources Information Center

    Theisen, Hilary M.; And Others

    1975-01-01

    This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)

  8. Solid Waste Management Planning--A Methodology

    ERIC Educational Resources Information Center

    Theisen, Hilary M.; And Others

    1975-01-01

    This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)

  9. SNL/CA Cultural Resources Management Plan.

    SciTech Connect

    Larsen, Barbara L.

    2005-11-01

    The SNL/CA Cultural Resources Management Plan satisfies the site's Environmental Management System requirement to promote long-term stewardship of cultural resources. The plan summarizes the cultural and historical setting of the site, identifies existing procedures and processes that support protection and preservation of resources, and outlines actions that would be initiated if cultural resources were discovered onsite in the future.3

  10. Managing Dualities in Planned Change Initiatives

    ERIC Educational Resources Information Center

    Barge, J. Kevin; Lee, Michael; Maddux, Kristy; Nabring, Richard; Townsend, Bryan

    2008-01-01

    Dualities play an important role in creating the conditions for change and managing planned change initiatives. Building on Seo, Putnam, and Bartunek's (2003) work, this study focuses on the dualities associated with managing change processes. A case study of a planned change process called the Circle of Prosperity Initiative, a multi-stakeholder…

  11. Theme: Planning, Organization and Time Management.

    ERIC Educational Resources Information Center

    Miller, Larry E.; And Others

    1985-01-01

    This issue focuses upon planning, organization, and time management. Articles discuss program goals, saving failing programs, vocational agriculture program planning under the Perkins Act, program innovation, reviewing the focus of agribusiness education, the changing focus of vocational agriculture at one high school, time management for summer…

  12. Managing Dualities in Planned Change Initiatives

    ERIC Educational Resources Information Center

    Barge, J. Kevin; Lee, Michael; Maddux, Kristy; Nabring, Richard; Townsend, Bryan

    2008-01-01

    Dualities play an important role in creating the conditions for change and managing planned change initiatives. Building on Seo, Putnam, and Bartunek's (2003) work, this study focuses on the dualities associated with managing change processes. A case study of a planned change process called the Circle of Prosperity Initiative, a multi-stakeholder…

  13. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names...

  14. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names...

  15. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names...

  16. Cost and quality planning for large NASA programs

    NASA Technical Reports Server (NTRS)

    Rone, Kyle Y.

    1990-01-01

    The Software Cost and Quality Engineering methodology developed over the last two decades at IBM Federal Sector Div. is used to plan the NASA Space Station Data Management System (DMS). An ongoing project to capture this methodology, which is built on a foundation of experiences and lessons learned, has resulted in the development of a PC-based tool that integrates cost and quality forecasting methodologies and data in a consistent manner. This tool, Software Cost and Quality Engineering Starter Set (SCQESS), is being used to assist in the DMS costing exercises. At the same time, DMS planning serves as a forcing function and provides a platform for the continuing, iterative development, calibration, and validation and verification of SCQESS. The data that forms the cost and quality engineering data base is derived from more than 17 years of development of NASA Space Shuttle software, ranging from low criticality, low complexity support tools to highly complex and highly critical onboard software.

  17. National Ignition Facility quality assurance program plan revision 2

    SciTech Connect

    Wolfe, C R

    1998-06-01

    NIF Project activities will be conducted in a manner consistent with the guidance and direction of the DOE Order on Quality Assurance (414.1), the LLNL QA Program, and the Laser Directorate QA Plan. Quality assurance criteria will be applied in a graded manner to achieve a balance between the rigor of application of QA measures and the scale, cost, and complexity of the work involved. Accountability for quality is everyone's, extending from the Project Manager through established lines of authority to all Project personnel, who are responsible for the requisite quality of their own work. The NLF QA Program will be implemented by personnel conducting their activities to meet requirements and expectations, according to established plans and procedures that reflect the way business is to be conducted on the Project.

  18. AVLIS Production Plant Preliminary Quality Assurance Plan and Assessment

    SciTech Connect

    Not Available

    1984-11-15

    This preliminary Quality Assurance Plan and Assessment establishes the Quality Assurance requirements for the AVLIS Production Plant Project. The Quality Assurance Plan defines the management approach, organization, interfaces, and controls that will be used in order to provide adequate confidence that the AVLIS Production Plant design, procurement, construction, fabrication, installation, start-up, and operation are accomplished within established goals and objectives. The Quality Assurance Program defined in this document includes a system for assessing those elements of the project whose failure would have a significant impact on safety, environment, schedule, cost, or overall plant objectives. As elements of the project are assessed, classifications are provided to establish and assure that special actions are defined which will eliminate or reduce the probability of occurrence or control the consequences of failure. 8 figures, 18 tables.

  19. Strategic Planning and Army Installation Management.

    DTIC Science & Technology

    1996-01-01

    program. The U.S. Army has adopted the Malcolm Baldrige National Quality Award criteria for use in the ACOE program. Strategic planning is one of the...seven pillars of the Baldrige criteria. The Army has recognized that strategic planning is the key to the future. Strategic planning is the key to...and utilization of strategic planning . This paper examines through case study analysis several civilian communities and lessons learned through their

  20. Lightning Mapper Sensor Lens Assembly S.O. 5459: Project Management Plan

    NASA Technical Reports Server (NTRS)

    Zeidler, Janet

    1999-01-01

    Kaiser Electro-Optics, Inc. (KEO) has developed this Project Management Plan for the Lightning Mapper Sensor (LMS) program. KEO has integrated a team of experts in a structured program management organization to meet the needs of the LMS program. The project plan discusses KEO's approach to critical program elements including Program Management, Quality Assurance, Configuration Management, and Schedule.

  1. Information resource management strategic business planning.

    PubMed

    Fogelsonger, L

    1995-08-01

    The business process and information management, rather than technology and systems, must be considered in today's health care environment. The article discusses the contents of an information resource management (IRM) strategic business plan and a five-step process used to construct the plan. Examples of strategic goals and objectives from an actual case study are provided. The resulting IRM strategic plan is designed to be used as a management tool that provides the flexibility and cohesiveness required to manage information in the current dynamic and resource-constrained environment.

  2. Process quality planning of quality function deployment for carrot syrup

    NASA Astrophysics Data System (ADS)

    Ekawati, Yurida; Noya, Sunday; Widjaja, Filemon

    2017-06-01

    Carrot products are rarely available in the market. Based on previous research that had been done using QFD to generate product design of carrots products, the research to produce the process quality planning had been carried out. The carrot product studied was carrot syrup. The research resulted in a process planning matrix for carrot syrup. The matrix gives information about critical process plan and the priority of the critical process plan. The critical process plan on the production process of carrot syrup consists of carrots sorting, carrots peeling, carrots washing, blanching process, carrots cutting, the making of pureed carrots, filtering carrot juice, the addition of sugar in carrot juice, the addition of food additives in carrot juice, syrup boiling, syrup filtering, syrup filling into the bottle, the bottle closure and cooling. The information will help the design of the production process of carrot syrup.

  3. Revision 2 of the Enbridge Quality Assurance Project Plan

    EPA Pesticide Factsheets

    This Quality Assurance Project Plan (QAPP) presents Revision 2 of the organization, objectives, planned activities, and specific quality assurance/quality control (QA/QC) procedures associated with the Enbridge Marshall Pipeline Release Project.

  4. Resource, quality and safety management.

    PubMed

    Hovenga, Evelyn J S

    2010-01-01

    This chapter gives an educational overview of: * Resource management relative to sustainability and the use casemix systems * Types of resources and their information system needs to support their optimal management * Quality, performance measurement options and associated information needs * Casemix systems' characteristics, usage and need for enterprise systems.

  5. Leadership and Total Quality Management

    DTIC Science & Technology

    1992-04-15

    Quality Management when combine with good leadership and management skills yields increased productivity. This paper will focus on the skills required of...The leadership of large and complex organizations in today’s environment of shrinking resources requires a strong commitment by the leader. Total

  6. What is Total Quality Management?

    ERIC Educational Resources Information Center

    Bryan, William A.

    1996-01-01

    Provides a general overview of Total Quality Management (TQM) and explains why there is pressure for change in higher education institutions. Defines TQM and the various themes, tools, and beliefs that make it different from other management approaches. Presents 14 principles and how they might be applied to student affairs. (RJM)

  7. Discharge planning quality from the carer perspective.

    PubMed

    Grimmer, K A; Moss, J R; Gill, T K

    2000-01-01

    Discharge planning endeavours to assist the transition of patients from the acute hospital setting into the community. We examined the quality of discharge planning from the perspective of the carer. Spouses were the most common carers for the elderly patients in our study. Many carers were also elderly, with their own health problems. Using a new instrument (entitled PREPARED) (K. Grimmer and J. Moss, Int J Qual Health Care (in press)), carers rated the quality of planning for discharge much lower than did the patient, indicating that their needs were often not met when discharge was being planned. In free text responses, carers expressed their dissatisfaction over communication about how the family would cope once the patient went home. Carers generally had lower summary mental quality of life scores than the Australian norms (as measured by the SF-36 health survey (J. Ware and R. Sherbourne, Med Care 1992; 30: 473-483)), suggesting that the caring role may have impacted upon their emotional wellbeing. The rate of use of community services in the first week post-discharge was low, suggesting that carers and patients carried the majority of the burden immediately after discharge. We suggest that planning for hospital discharge requires more consideration of the carer.

  8. Assessment of the Quality Management Models in Higher Education

    ERIC Educational Resources Information Center

    Basar, Gulsun; Altinay, Zehra; Dagli, Gokmen; Altinay, Fahriye

    2016-01-01

    This study involves the assessment of the quality management models in Higher Education by explaining the importance of quality in higher education and by examining the higher education quality assurance system practices in other countries. The qualitative study was carried out with the members of the Higher Education Planning, Evaluation,…

  9. Systems Engineering Management Plan. Volume 5 of the MRS Project Management Plan

    SciTech Connect

    Not Available

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP).

  10. Individual Planning: An Exploration of the Link between Quality of Plan and Quality of Life

    ERIC Educational Resources Information Center

    Adams, Lynn; Beadle-Brown, Julie; Mansell, Jim

    2006-01-01

    Individual plans for people with intellectual disabilities were evaluated for quality and effectiveness in improving quality of life. Quality was assessed by rating whether goals were relevant, observable, age appropriate, necessary, timetabled, developmental, measurable, realistic, assigned to staff and improving at least one of O'Brien's five…

  11. Writing Plan Quality: Relevance to Writing Scores

    ERIC Educational Resources Information Center

    Chai, Constance

    2006-01-01

    If writing matters, how can we improve it? This study investigated the nature of writing plan quality and its relationship to the ensuing writing scores. Data were drawn from the 1998 Provincial Learning Assessment Programme (PLAP) in Writing, which was administered to pupils in Grades 4, 7, and 10 across British Columbia, Canada. Common features…

  12. Software quality assurance plan for GCS

    NASA Technical Reports Server (NTRS)

    Duncan, Stephen E.; Bailey, Elizabeth K.

    1990-01-01

    The software quality assurance (SQA) function for the Guidance and Control Software (GCS) project which is part of a software error studies research program is described. The SQA plan outlines all of the procedures, controls, and audits to be carried out by the SQA organization to ensure adherence to the policies, procedures, and standards for the GCS project.

  13. Using CCSSE in Planning for Quality Enhancement

    ERIC Educational Resources Information Center

    Balog, Scott E.; Search, Sally P.

    2006-01-01

    This chapter describes how Tallahassee Community College used CCSSE data as part of its overall student-retention program, consisting of faculty workshops, analysis of state accountability data, and conscious incorporation of best practices. The resulting Quality Enhancement Plan (QEP) meets accreditation requirements and strengthens the college's…

  14. Project Management Plan (PMP) for Work Management Implementation

    SciTech Connect

    SHIPLER, C.E.

    2000-01-13

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  15. Link between traditional planning and energy management

    SciTech Connect

    Schweitzer, M.

    1981-01-01

    In simple terms, community energy planning is the process of envisioning a desired future state of energy supply and consumption for a local area and designing the appropriate measures to implement that future. While energy planning can be distinguished from other specialized concerns, such as housng or transportation planning, there are also major similarities which bind all these elements together. These similarities and differences are discussed. Community-level energy planning represents a natural extension of the comprehensive planning process. As the comprehensive plan has grown in the past to reflect new subjects of public concern such as environmental quality and economic development, so it can evolve further to address society's growing interest in energy use. Because the general purpose, process, and implementation devices associated with energy planning tie it closely with the comprehensive planning process as currently practiced, incorporating energy issues into the comprehensive plan should be a relatively simple matter.

  16. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    SciTech Connect

    Fix, N. J.

    2007-01-10

    The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  17. A study of IMRT planning parameters on planning efficiency, delivery efficiency, and plan quality

    SciTech Connect

    Mittauer, Kathryn; Lu Bo; Yan Guanghua; Kahler, Darren; Amdur, Robert; Liu Chihray; Gopal, Arun

    2013-06-15

    Purpose: To improve planning and delivery efficiency of head and neck IMRT without compromising planning quality through the evaluation of inverse planning parameters.Methods: Eleven head and neck patients with pre-existing IMRT treatment plans were selected for this retrospective study. The Pinnacle treatment planning system (TPS) was used to compute new treatment plans for each patient by varying the individual or the combined parameters of dose/fluence grid resolution, minimum MU per segment, and minimum segment area. Forty-five plans per patient were generated with the following variations: 4 dose/fluence grid resolution plans, 12 minimum segment area plans, 9 minimum MU plans, and 20 combined minimum segment area/minimum MU plans. Each plan was evaluated and compared to others based on dose volume histograms (DVHs) (i.e., plan quality), planning time, and delivery time. To evaluate delivery efficiency, a model was developed that estimated the delivery time of a treatment plan, and validated through measurements on an Elekta Synergy linear accelerator. Results: The uncertainty (i.e., variation) of the dose-volume index due to dose calculation grid variation was as high as 8.2% (5.5 Gy in absolute dose) for planning target volumes (PTVs) and 13.3% (2.1 Gy in absolute dose) for planning at risk volumes (PRVs). Comparison results of dose distributions indicated that smaller volumes were more susceptible to uncertainties. The grid resolution of a 4 mm dose grid with a 2 mm fluence grid was recommended, since it can reduce the final dose calculation time by 63% compared to the accepted standard (2 mm dose grid with a 2 mm fluence grid resolution) while maintaining a similar level of dose-volume index variation. Threshold values that maintained adequate plan quality (DVH results of the PTVs and PRVs remained satisfied for their dose objectives) were 5 cm{sup 2} for minimum segment area and 5 MU for minimum MU. As the minimum MU parameter was increased, the number of

  18. A study of IMRT planning parameters on planning efficiency, delivery efficiency, and plan quality.

    PubMed

    Mittauer, Kathryn; Lu, Bo; Yan, Guanghua; Kahler, Darren; Gopal, Arun; Amdur, Robert; Liu, Chihray

    2013-06-01

    To improve planning and delivery efficiency of head and neck IMRT without compromising planning quality through the evaluation of inverse planning parameters. Eleven head and neck patients with pre-existing IMRT treatment plans were selected for this retrospective study. The Pinnacle treatment planning system (TPS) was used to compute new treatment plans for each patient by varying the individual or the combined parameters of dose∕fluence grid resolution, minimum MU per segment, and minimum segment area. Forty-five plans per patient were generated with the following variations: 4 dose∕fluence grid resolution plans, 12 minimum segment area plans, 9 minimum MU plans, and 20 combined minimum segment area∕minimum MU plans. Each plan was evaluated and compared to others based on dose volume histograms (DVHs) (i.e., plan quality), planning time, and delivery time. To evaluate delivery efficiency, a model was developed that estimated the delivery time of a treatment plan, and validated through measurements on an Elekta Synergy linear accelerator. The uncertainty (i.e., variation) of the dose-volume index due to dose calculation grid variation was as high as 8.2% (5.5 Gy in absolute dose) for planning target volumes (PTVs) and 13.3% (2.1 Gy in absolute dose) for planning at risk volumes (PRVs). Comparison results of dose distributions indicated that smaller volumes were more susceptible to uncertainties. The grid resolution of a 4 mm dose grid with a 2 mm fluence grid was recommended, since it can reduce the final dose calculation time by 63% compared to the accepted standard (2 mm dose grid with a 2 mm fluence grid resolution) while maintaining a similar level of dose-volume index variation. Threshold values that maintained adequate plan quality (DVH results of the PTVs and PRVs remained satisfied for their dose objectives) were 5 cm(2) for minimum segment area and 5 MU for minimum MU. As the minimum MU parameter was increased, the number of segments and delivery

  19. [Evaluation model for municipal health planning management].

    PubMed

    Berretta, Isabel Quint; Lacerda, Josimari Telino de; Calvo, Maria Cristina Marino

    2011-11-01

    This article presents an evaluation model for municipal health planning management. The basis was a methodological study using the health planning theoretical framework to construct the evaluation matrix, in addition to an understanding of the organization and functioning designed by the Planning System of the Unified National Health System (PlanejaSUS) and definition of responsibilities for the municipal level under the Health Management Pact. The indicators and measures were validated using the consensus technique with specialists in planning and evaluation. The applicability was tested in 271 municipalities (counties) in the State of Santa Catarina, Brazil, based on population size. The proposed model features two evaluative dimensions which reflect the municipal health administrator's commitment to planning: the guarantee of resources and the internal and external relations needed for developing the activities. The data were analyzed using indicators, sub-dimensions, and dimensions. The study concludes that the model is feasible and appropriate for evaluating municipal performance in health planning management.

  20. 42 CFR 441.474 - Quality assurance and improvement plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Quality assurance and improvement plan. 441.474... improvement plan. (a) The State must provide a quality assurance and improvement plan that describes the State... pursue opportunities for system improvement. (b) The quality assurance and improvement plan shall also...

  1. 45 CFR 1304.60 - Deficiencies and quality improvement plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Deficiencies and quality improvement plans. 1304... must correct the deficiency either immediately or pursuant to a Quality Improvement Plan. (c) An Early... Improvement Plan must submit to the responsible HHS official a Quality Improvement Plan specifying, for each...

  2. 48 CFR 37.604 - Quality assurance surveillance plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... surveillance plans. 37.604 Section 37.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans are in Subpart 46.4. The Government may either prepare the quality assurance surveillance plan or...

  3. 48 CFR 37.604 - Quality assurance surveillance plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... surveillance plans. 37.604 Section 37.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans are in Subpart 46.4. The Government may either prepare the quality assurance surveillance plan or...

  4. Air quality management in Mexico.

    PubMed

    Fernández-Bremauntz, Adrián

    2008-01-01

    Several significant program and policy measures have been implemented in Mexico over the past 15 yr to improve air quality. This article provides an overview of air quality management strategies in Mexico, including (1) policy initiatives such as vehicle use restrictions, air quality standards, vehicle emissions, and fuel quality standards, and (2) supporting programs including establishment of a national emission inventory, an air pollution episodes program, and the implementation of exposure and health effects studies. Trends in air pollution episodes and ambient air pollutant concentrations are described.

  5. [Informatics data quality and management].

    PubMed

    Feng, Rung-Chuang

    2009-06-01

    While the quality of data affects every aspect of business, it is frequently overlooked in terms of customer data integration, data warehousing, business intelligence and enterprise applications. Regardless of which data terms are used, a high level of data quality is a critical base condition essential to satisfy user needs and facilitate the development of effective applications. In this paper, the author introduces methods, a management framework and the major factors involved in data quality assessment. Author also integrates expert opinions to develop data quality assessment tools.

  6. Large hadron collider (LHC) project quality assurance plan

    SciTech Connect

    Gullo, Lisa; Karpenko, Victor; Robinson, Kem; Turner, William; Wong, Otis

    2002-09-30

    The LHC Quality Assurance Plan is a set of operating principles, requirements, and practices used to support Berkeley Lab's participation in the Large Hadron Collider Project. The LHC/QAP is intended to achieve reliable, safe, and quality performance in the LHC project activities. The LHC/QAP is also designed to fulfill the following objectives: (1) The LHC/QAP is Berkeley Lab's QA program document that describes the elements necessary to integrate quality assurance, safety management, and conduct of operations into the Berkeley Lab's portion of the LHC operations. (2) The LHC/QAP provides the framework for Berkeley Lab LHC Project administrators, managers, supervisors, and staff to plan, manage, perform, and assess their Laboratory work. (3) The LHC/QAP is the compliance document that conforms to the requirements of the Laboratory's Work Smart Standards for quality assurance (DOE O 414.1, 10 CFR 830.120), facility operations (DOE O 5480.19), and safety management (DOE P 450.4).

  7. Total quality management issues in managed care.

    PubMed

    McLaughlin, C P; Kaluzny, A D

    1997-01-01

    The implementation of total quality management (TQM) in health care has gone on in parallel with the growth of managed care. What is the interaction between the two? Key issues are the ascendance of cost control over quality in many areas, erosion of employee commitment and loyalty, and a short-run orientation. Associated with this is an emphasis on organizational learning rather than learning by autonomous professionals. Both TQM and managed care acknowledge the dynamic nature of clinical processes and the ability and responsibility of both institutions and clinicians to improve their processes. Both are consistent with efforts to identify and implement best practices. However, these similarities should not mask fundamental differences. Continuous improvement must shift its focus from avoiding unnecessary variation to facilitating rapid organizational learning and institutionalizing mass customization into the delivery of health services.

  8. Configuration Management Plan for K Basins

    SciTech Connect

    Weir, W.R.; Laney, T.

    1995-01-27

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93, {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.

  9. Software configuration management plan for HANDI 2000 business management system

    SciTech Connect

    BENNION, S.I.

    1999-02-10

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software, as well as any custom developed software. This plan establishes requirements and processes for uniform documentation and coordination of HANDI 2000. This SCMP becomes effective as of this document's acceptance and will provide guidance through implementation efforts.

  10. Automated transportation management system (ATMS) software project management plan (SPMP)

    SciTech Connect

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  11. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed...

  12. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory...

  13. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory...

  14. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed...

  15. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory...

  16. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for...

  17. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for...

  18. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for...

  19. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for...

  20. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for...

  1. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed...

  2. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed to...

  3. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory protection...

  4. Quality Management and Calibration

    NASA Astrophysics Data System (ADS)

    Merkus, Henk G.

    Good specification of a product’s performance requires adequate characterization of relevant properties. Particulate products are usually characterized by some PSD, shape or porosity parameter(s). For proper characterization, adequate sampling, dispersion, and measurement procedures should be available or developed and skilful personnel should use appropriate, well-calibrated/qualified equipment. The characterization should be executed, in agreement with customers, in a wellorganized laboratory. All related aspects should be laid down in a quality handbook. The laboratory should provide proof for its capability to perform the characterization of stated products and/or reference materials within stated confidence limits. This can be done either by internal validation and audits or by external GLP accreditation.

  5. Waste Isolation Pilot Plant, Land Management Plan

    SciTech Connect

    Not Available

    1993-12-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

  6. Planning and Management for Excellence and Efficiency in Higher Education.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Paris (France).

    This round table discussion involved some 50 participants and seven panelists and focused on planning and management for excellence and efficiency in higher education. Basic issues or problems facing higher education were identified including coping with increasing student numbers, raising the quality of teaching, training and research programs,…

  7. 78 FR 77550 - Integrated Corridor Management Deployment Planning Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... Federal Highway Administration Integrated Corridor Management Deployment Planning Grants AGENCY: Federal... is extending the application period for the Integrated Corridor Management Deployment Planning Grants... Integrated Corridor Management Deployment Planning Grants. The purpose of this notice was to invite...

  8. Mixed waste management facility FY94 plan

    SciTech Connect

    Streit, R.

    1994-01-01

    This document is a progress report detailing the different aspects of the project plan. Included are the topics of quality assurance, safety and cost as they relate to the processing and storage of hazardous materials and radioactive waste.

  9. Partnerships for Quality: A Statewide Plan for Developing and Implementing a Total Quality Curriculum Delivered through Oregon's Community Colleges.

    ERIC Educational Resources Information Center

    Oregon State Economic Development Dept., Salem.

    The Oregon Advanced Technology Consortium (OATC) created the Partnerships for Quality Project (PQP) to improve Oregon's community colleges by developing a total quality curriculum (TQC) based on the beliefs and practices of total quality management (TQM). This report summarizes the recommendations of the PQP and presents a plan of action for the…

  10. Total Quality Management (TQM): Group Dynamics Workshop

    DTIC Science & Technology

    1990-05-15

    TOTAL QUALITY MANAGEMENT (TQM) Group Dynamics Workshop © Copyright 1990 Booz*Allen & Hamilton... QUALITY MANAGEMENT (TQM) GROUP DYNAMICS COURSE -’ Total Quality Management * This course has been designed under the direction and approval of OASD (P...participants’ use of group dynamics skills as leaders and members of OSD TQM groups. Total Quality Management " Examples of such groups include

  11. 222-S laboratory quality assurance plan

    SciTech Connect

    Meznarich, H.K.

    1995-04-01

    This document provides quality assurance guidelines and quality control requirements for analytical services. This document is designed on the basis of Hanford Analytical Services Quality Assurance Plan (HASQAP) technical guidelines and is used for governing 222-S and 222-SA analytical and quality control activities. The 222-S Laboratory provides analytical services to various clients including, but not limited to, waste characterization for the Tank Waste Remediation Systems (TWRS), waste characterization for regulatory waste treatment, storage, and disposal (TSD), regulatory compliance samples, radiation screening, process samples, and TPA samples. A graded approach is applied on the level of sample custody, QC, data verification, and data reporting to meet the specific needs of the client.

  12. Emergency management: expanding the disaster plan.

    PubMed

    Ross, Kevin L; Bing, Caryn M

    2007-06-01

    A comprehensive emergency management plan (CEMP) is key to minimizing the disruption of patient care and services during and after a natural or man-made disaster. The home health nurse can play a key role in enhancing, expanding, and evaluating the effectiveness of the organization's disaster plan. The components of a CEMP and lessons learned from actual implementation of disaster plans in home care are addressed. The disasters and emergencies of the past few years, such as threats of terrorism, hurricanes, floods, wildfires, tornadoes, and earthquakes, have validated the need to extend the emergency preparedness plan to a more comprehensive approach to emergency management. Communities, healthcare providers, and individuals/families all have been urged to take a more comprehensive look at their readiness for these types of events. Home healthcare organizations, including home health agencies, hospice providers, infusion providers, and medical equipment companies, can take a fresh and comprehensive look at their emergency management plan.

  13. S-PRIME Thermionic Space Nuclear Power System Quality Assurance Program Plan

    SciTech Connect

    Jones, C.M.

    1992-09-23

    This Quality Assurance Program Plan (QAPP)describes how the Thermionic Space Nuclear Power System Design and Technology Demonstration Project addresses the Quality Assurance requirements delineated in DOE Order 5700.6C and the Thermionic Program Management Plan 214PMP000001. The Quality Assurance Program is based on the following fundamental principles, which Rocketdyne endorses and the QA Project Manager and Program Manager shall enforce: Quality Achievement is a continuing responsibility of line organization at all levels; the Quality Assurance organization through the effective overview of work, gives additional assurance that specified requirements are met; risk is the fundamental consideration in determining to what extent the Quality Assurance Plan should be applied to items and processes; action is based on facts and analysis, customer driven quality, strong quality leadership and continuous improvement.

  14. Managing Uncertainty: Thinking and Planning Strategically.

    ERIC Educational Resources Information Center

    Lorenzo, Albert L.

    1993-01-01

    Argues that rapid change and tight resources demand reality-based planning, rather than planning models that ignore internal and external customers or emphasize process over product. Describes the Strategic Guidance Model (SGM) which provides colleges with strategic visioning, organizational assessment, environmental scanning, quality improvement,…

  15. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  16. Introduction to Soil Fumigant Management Plans

    EPA Pesticide Factsheets

    Soil fumigant pesticide labels require users to prepare a site-specific fumigation management plan (FMP) before the application begins. EPA has developed templates that outline the elements required by the labels.

  17. BROOKHAVEN NATIONAL LABORATORY WILDLIFE MANAGEMENT PLAN.

    SciTech Connect

    NAIDU,J.R.

    2002-10-22

    The purpose of the Wildlife Management Plan (WMP) is to promote stewardship of the natural resources found at the Brookhaven National Laboratory (BNL), and to integrate their protection with pursuit of the Laboratory's mission.

  18. Quality assurance FY 1995 site support program plan WBS 6.7.2.5

    SciTech Connect

    Dell, L.D.

    1994-09-01

    This report is a summary of the quality assurance plan and program for the Westinghouse Hanford Company. The quality assurance plan verifies that the appropriate quality assurance programs and controls are applied to activities that affect quality related to work in: waste management; environmental activities (restoration, remediation, and monitoring); implementation of environmental, state, local, and federal regulations; tri-party agreement activities; facility operation and deactivation/transition to shutdown; new facility construction and operation.

  19. Special event planning for the emergency manager.

    PubMed

    Gaynor, Peter T

    2009-11-01

    In the domain of emergency management and homeland security there is a lack of a formal planning process at the local level when it comes to special event planning. The unique nature of special event planning demands an understanding of the planning process for both traditional and non-traditional planning partners. This understanding will make certain that local governments apply due diligence when planning for the safety of the public. This paper offers a practical roadmap for planning at the local level. It will address those 'special events' that are beyond routine local events but not of a sufficient scale to be granted National Special Security Event status. Due to the infrequency of 'special events' in most communities, it is imperative that deliberate planning takes place. Upon conclusion, the reader will be able to construct a planning process tailored to the needs of their community, guide both traditional and non-traditional planning partners through the planning process, determine priorities, explore alternatives, plan for contingencies, conduct a confirmation brief, facilitate operations and assemble an after-action report and improvement plan.

  20. Buried waste integrated demonstration configuration management plan

    SciTech Connect

    Cannon, P.G.

    1992-02-01

    This document defines plans for the configuration management requirements for the Buried Waste Integrated Demonstration (BWID) Program. Since BWID is managed programmatically by the Waste Technology Development Department (WTDD), WTDD Program Directive (PD) 1.5 (Document Preparation, Review, Approval, Publication, Management and Change Control) is to be followed for all internal EG G Idaho, Inc., BWID programmatic documentation. BWID documentation generated by organizations external to EG G Idaho is not covered by this revision of the Configuration Management Plan (CMP), but will be addressed in subsequent revisions.

  1. Buried waste integrated demonstration configuration management plan

    SciTech Connect

    Cannon, P.G.

    1992-02-01

    This document defines plans for the configuration management requirements for the Buried Waste Integrated Demonstration (BWID) Program. Since BWID is managed programmatically by the Waste Technology Development Department (WTDD), WTDD Program Directive (PD) 1.5 (Document Preparation, Review, Approval, Publication, Management and Change Control) is to be followed for all internal EG&G Idaho, Inc., BWID programmatic documentation. BWID documentation generated by organizations external to EG&G Idaho is not covered by this revision of the Configuration Management Plan (CMP), but will be addressed in subsequent revisions.

  2. Quality-assurance plan for the analysis of suspended sediment by the U.S. Geological Survey in Montana

    USGS Publications Warehouse

    Dodge, Kent A.; Lambing, John H.

    2006-01-01

    A quality-assurance plan has been developed for use by the sediment laboratory of the U.S. Geological Survey Montana Water Science Center in conducting activities related to the analysis of suspended sediment. The plan documents quality-assurance policies for sediment-laboratory certification, personnel responsibilities and training, documentation requirements, and laboratory safety. The plan also documents quality-assurance procedures related to laboratory equipment and supplies, sample management, sample analysis, analytical quality control, and data management.

  3. Water quality improvement plan for Greater Vancouver

    SciTech Connect

    Foellmi, S.N. . Environmental Div.); Neden, D.G. ); Dawson, R.N. )

    1993-10-01

    The Greater Vancouver Regional District commissioned an 18-month planning and predesign study to define the components in a comprehensive water and predesign study to define the components in a comprehensive water quality improvement plan for its 2,500-ML/d (660-mgd) system. The study included three primary tasks: (1) predesign of disinfection and corrosion control facilities, (2) a 12-month pilot testing program using parallel pilot plants at the Seymour and Capilano water supply reservoirs, and (3) planning for future filtration plants. The results of the study identified chlorine, ammonia, sulfur dioxide, soda ash, and carbon dioxide in a two-stage treatment approach as the recommended disinfection and corrosion control scheme for the low-pH, low-alkalinity water supplies. The pilot-plant studies confirmed that direct filtration using deep-bed monomedium filters operating at a loading rate of 22.5 m/h provided excellent treatment performance and productivity over a wide range of raw-water quality. Ozonation was studied extensively and found not to be beneficial in the overall treatment performance. The phased improvement plan for the disinfection, corrosion control, and filtration facilities has an estimated capital cost of about Can$459 million.

  4. Do You Have a Crisis Management Plan?

    ERIC Educational Resources Information Center

    Pleviak, Walter; Milkevitch, Frank

    2001-01-01

    Although certain crises cannot be prevented, reactions to many can be planned. A crisis-management team should be organized for each building. Critical crisis-plan elements include telephone trees, forms, reference articles, sample letters, and processes for dealing with local media. Spokespersons should have facts straight before speaking. (MLH)

  5. Planning and Managing School Facilities. Second Edition.

    ERIC Educational Resources Information Center

    Kowalski, Theodore J.

    This book addresses the administrative procedures associated with planning and managing school facilities. As noted at the outset, practitioner interest in school facilities has been growing rapidly in recent years because decades of neglect, poor planning, and cost cutting have created a situation in which large numbers of America's school…

  6. Draft of the PHENIX Management Plan

    SciTech Connect

    Not Available

    1994-03-10

    The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants.

  7. Family planning, managed care, and rural America.

    PubMed

    McCarthy, M; Jacquart, K; Quam, L

    1995-09-01

    Within the United States, rural residents encounter a greater number of barriers in accessing health care services than their urban counterparts. In general, rural Americans have less access to both family planning services and managed care delivery systems. Given the rapid changes in health care, we reviewed the implications for the provision and integration of family planning and managed care services in rural areas, where there is limited experience in establishing working relationships between those services. In many instances, family planning services are well established in rural areas where managed care has not yet penetrated. Our case study in Minnesota suggests that, although managed care and family planning services are developing in rural areas, there is little evidence of collaboration. Several innovative and successful family planning projects do exist in rural areas, however, and serve as models of successful population-based programs that could work well with health plans. Although this study concentrated on the provision and utilization of subsidized family planning services, there is a compelling need for further work to determine accurately where rural residents are accessing such services and how the expansion of managed care will affect the delivery of reproductive health care.

  8. 200 Area Liquid Effluent Facilities -- Quality assurance program plan

    SciTech Connect

    Fernandez, L.

    1995-03-13

    This Quality Assurance Program Plan (QAPP) describes the quality assurance and management controls used by the 200 Area Liquid Effluent Facilities (LEF) to perform its activities in accordance with DOE Order 5700.6C. The 200 Area LEF consists of the following facilities: Effluent Treatment Facility (ETF); Treated Effluent Disposal Facility (TEDF); Liquid Effluent Retention facility (LERF); and Truck Loading Facility -- (Project W291). The intent is to ensure that all activities such as collection of effluents, treatment, concentration of secondary wastes, verification, sampling and disposal of treated effluents and solids related with the LEF operations, conform to established requirements.

  9. Leadership and management for quality.

    PubMed

    Gillam, Steve; Siriwardena, A Niroshan

    2013-01-01

    This is the third in a series of articles about the science of quality improvement. Leadership and management are required for change and are therefore important for all quality improvement initiatives. We describe the differences between and features of each, and how they support change in individuals, groups and organisations according to the culture and characteristics of the latter. Finally, we see that leadership competencies are conceptualised in the NHS Leadership Framework and how this can be applied to quality improvement in general practice and healthcare more generally.

  10. A groundwater management plan for Stuttgart.

    PubMed

    Vasin, Sandra; Carle, Achim; Lang, Ulrich; Kirchholtes, Hermann Josef

    2016-09-01

    In general, groundwater in urban areas is exposed to anthropogenic influence and suffers from concentrations of contaminants. Stuttgart, as a highly industrialized city, has more than 5000 contaminated sites which might influence the Stuttgart's mineral water quality. Despite tremendous efforts and intensive single site orientated remediation since 1984 in downtown, the mineral springs were still affected with chlorinated hydrocarbons at low concentrations. Therefore, the applied practices of environmental management and measures for mitigation of pollution sources were not sufficient and had to be adjusted. The main goal of this study is to define an integral remediation plan (a groundwater management plan), focusing on the key sources of chlorinated solvents which are relevant for the mineral springs. For the large-scale investigated area of 26.6km(2) and eight aquifers, an extensive investigation and characterization methods were used in order to delineate the contamination plumes. By means of a 3D numerical model, the prioritization of the contaminated sites could be performed. Five contaminated sites with high remediation priority and need for optimized or additional remediation efforts were determined. For those five contaminated sites feasibility studies were performed which resulted in recommendation of remediation measures with total costs of more than 12.5 million euros. The proposed strategy and approach are suitable for multiple sources of contamination. Only in this way, the contributions of single contaminated sites to the total groundwater contamination can be identified and local remediation measures with their spatial impact simulated. Due to very complex geological conditions, technically there is no alternative to this strategy in order to achieve the contamination reduction in groundwater.

  11. The Groundwater Performance Assessment Project Quality Assurance Plan

    SciTech Connect

    Luttrell, Stuart P.

    2006-05-11

    U.S. Department of Energy (DOE) has monitored groundwater on the Hanford Site since the 1940s to help determine what chemical and radiological contaminants have made their way into the groundwater. As regulatory requirements for monitoring increased in the 1980s, there began to be some overlap between various programs. DOE established the Groundwater Performance Assessment Project (groundwater project) in 1996 to ensure protection of the public and the environment while improving the efficiency of monitoring activities. The groundwater project is designed to support all groundwater monitoring needs at the site, eliminate redundant sampling and analysis, and establish a cost-effective hierarchy for groundwater monitoring activities. This document provides the quality assurance guidelines that will be followed by the groundwater project. This QA Plan is based on the QA requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--General Provisions/Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the groundwater project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The groundwater project has determined that the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  12. Total Quality Management Implementation Strategy: Directorate of Quality Assurance

    DTIC Science & Technology

    1989-05-01

    Directorate of Quality Assurance Total Quality Management Implementation Strategy 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADORESS(ES) 8...that job. DTIC 7: t-I ECTE I SEP29 1989 14. SUBJECT TERMS 15. NUMBER OF PAGES TOM ( Total Quality Management ), Quality Assurance, Continuous Process...Prescribed by ANSI Std Z39-18 29d- 102 DEFENSE LOGISTICS AGENCY DIRECTORATE OF QUALITY ASSURANCE 0 TOTAL QUALITY MANAGEMENT IMPLEMENTATION STRATEGY 0 89 9

  13. Indoor Air Quality Management Program.

    ERIC Educational Resources Information Center

    Anne Arundel County Public Schools, Annapolis, MD.

    In an effort to provide Indoor Air Quality (IAQ) management guidance, Anne Arundel County Public Schools was selected by the Maryland State Department of Education to develop a program that could be used by other school systems. A major goal was to produce a handbook that was "user friendly." Hence, its contents are a mix of history,…

  14. Indoor Air Quality Management Program.

    ERIC Educational Resources Information Center

    Anne Arundel County Public Schools, Annapolis, MD.

    In an effort to provide Indoor Air Quality (IAQ) management guidance, Anne Arundel County Public Schools was selected by the Maryland State Department of Education to develop a program that could be used by other school systems. A major goal was to produce a handbook that was "user friendly." Hence, its contents are a mix of history,…

  15. E-Service Quality Management

    ERIC Educational Resources Information Center

    Batagan, Lorena; Pocovnicu, Adrian; Capisizu, Sergiu

    2009-01-01

    A characteristic of today's society is the increasing use of modern information and communication technologies in all areas. Computer applications, called e-services, are being developed to provide efficient access to services, electronically. Quality management systems are needed to provide a consistent way to select, evaluate, prioritize and…

  16. Total Quality Management in Education.

    ERIC Educational Resources Information Center

    Johnson, James H.

    1993-01-01

    Ways to apply the concepts and processes of Total Quality Management (TQM) to education are discussed in this document. Following the introduction and the preface, chapter 1 provides a historical overview and describes the four cornerstones of TQM--an understanding of systems, psychology, knowledge, and statistics. Chapter 2 describes some of the…

  17. UMTRA technical assistance contractor Quality Assurance Program Plan. Revision 4

    SciTech Connect

    Pehrson, P.

    1993-10-12

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation.

  18. Planning and managing the physician workforce.

    PubMed

    Schoenbaum, Stephen C

    2012-03-12

    National planning and management of the physician workforce is a multifaceted, difficult, and even controversial activity. It is an important subset of overall health workforce planning and management, which contributes to a country's having an effective and efficient health care system. This commentary builds on a new survey of specialty considerations by Israeli medical students early in their clinical training, places it in the broader context of health workforce planning, and provides examples of some approaches and activities being taken in the United States that are applicable to other developed countries.This is a commentary on http://www.ijhpr.org/content/1/1/13.

  19. Quality control and quality assurance plan for bridge channel-stability assessments in Massachusetts

    USGS Publications Warehouse

    Parker, Gene W.; Pinson, Harlow

    1993-01-01

    A quality control and quality assurance plan has been implemented as part of the Massachusetts bridge scour and channel-stability assessment program. This program is being conducted by the U.S. Geological Survey, Massachusetts-Rhode Island District, in cooperation with the Massachusetts Highway Department. Project personnel training, data-integrity verification, and new data-management technologies are being utilized in the channel-stability assessment process to improve current data-collection and management techniques. An automated data-collection procedure has been implemented to standardize channel-stability assessments on a regular basis within the State. An object-oriented data structure and new image management tools are used to produce a data base enabling management of multiple data object classes. Data will be reviewed by assessors and data base managers before being merged into a master bridge-scour data base, which includes automated data-verification routines.

  20. Quality assurance program plan for SNF characterization support project

    SciTech Connect

    Tanke, J.M.

    1997-05-22

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Spent Nuclear Fuel Characterization Support Project. This QAPP has been developed specifically for the Spent Nuclear Fuel Characterization Support Project, per Letter of Instruction (LOI) from Duke Engineering and Services Company, letter No. DESH-9655870, dated Nov. 22, 1996. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP) and LOI. These activities include installation of sectioning equipment and furnace, surface and subsurface examinations, sectioning for metallography, and element drying and conditioning testing, as well as project related operations within the 327 facility as it relates to the specific activities of this project. General facility activities are covered in other appropriate QA-PPS. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping,1261 and HSRCM-1, Hanford Site Radiological Control Manual. The 327 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a Babcock and Wilcox Hanford Company (BVMC) managed facility. During this transition process existing procedures and documents will be utilized until replaced by BVMC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to IO CFR 830.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be utilized in support of this project and the subject organizations are

  1. SU-D-BRD-03: Improving Plan Quality with Automation of Treatment Plan Checks

    SciTech Connect

    Covington, E; Younge, K; Chen, X; Lee, C; Matuszak, M; Kessler, M; Acosta, E; Orow, A; Filpansick, S; Moran, J; Keranen, W

    2015-06-15

    Purpose: To evaluate the effectiveness of an automated plan check tool to improve first-time plan quality as well as standardize and document performance of physics plan checks. Methods: The Plan Checker Tool (PCT) uses the Eclipse Scripting API to check and compare data from the treatment planning system (TPS) and treatment management system (TMS). PCT was created to improve first-time plan quality, reduce patient delays, increase efficiency of our electronic workflow, and to standardize and partially automate plan checks in the TPS. A framework was developed which can be configured with different reference values and types of checks. One example is the prescribed dose check where PCT flags the user when the planned dose and the prescribed dose disagree. PCT includes a comprehensive checklist of automated and manual checks that are documented when performed by the user. A PDF report is created and automatically uploaded into the TMS. Prior to and during PCT development, errors caught during plan checks and also patient delays were tracked in order to prioritize which checks should be automated. The most common and significant errors were determined. Results: Nineteen of 33 checklist items were automated with data extracted with the PCT. These include checks for prescription, reference point and machine scheduling errors which are three of the top six causes of patient delays related to physics and dosimetry. Since the clinical roll-out, no delays have been due to errors that are automatically flagged by the PCT. Development continues to automate the remaining checks. Conclusion: With PCT, 57% of the physics plan checklist has been partially or fully automated. Treatment delays have declined since release of the PCT for clinical use. By tracking delays and errors, we have been able to measure the effectiveness of automating checks and are using this information to prioritize future development. This project was supported in part by P01CA059827.

  2. Federal emergency management planning. Student essay

    SciTech Connect

    McMullen, J.

    1987-03-23

    Prior to 1978, Federal Emergency Planning had been accomplished by several Federal Civil Agencies. To those who attempted to use the system, the process was described as dismal. There was no central point of departure for Federal emergency management information. Because the Federal Planning System was so bad, President Carter submitted to Congress Reorganization No. 3 of 1978 which consolidated the oversight responsibility for Federal emergency planning into a single agency known as the Federal Emergency Management Agency (FEMA). Consolidated under FEMA were all authorities and functions delegated by law to the President and the Executive for Federal emergency planning. The spectrum of Federal preparedness planning performed by FEMA ranges from a natural disaster to a nuclear attack on the United States. Although constrained by increasing Federal budget deficits and the demand for fiscal soundness, many in FEMA believe that the Agency is prepared to cope with a future that is characterized as complex, and full of uncertainties.

  3. Graduate Student Project: Operations Management Product Plan

    ERIC Educational Resources Information Center

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  4. Strategic Management or Strategic Planning for Defense?

    DTIC Science & Technology

    1989-02-01

    manage at the regional or CinC level with an appreciation of strategic planning and management concepts currently taught at business schools . Military...those not in uniform. Science, engineering, and business schools all suggest that their faculties have experience tours so that they can appreciate

  5. Strategic Planning for Information Resources Management.

    ERIC Educational Resources Information Center

    Penrod, James; Dolence, Michael

    1987-01-01

    In 1985, California State University/Los Angeles changed the management of its information resources by hiring a vice president for information resources management; reorganizing existing units into an IRM organization; engaging in a detailed, integrated, participative strategic planning process; and initiating several significant projects.…

  6. Planning, Designing and Managing Higher Education Institutions

    ERIC Educational Resources Information Center

    Daigneau, William A.; Valenti, Mark S.; Ricciarini, Sylvana; Bender, Stephen O.; Alleyne, Nicole; Di Grappa, Michael; Duart, Josep M.; Lupianez, Francisco; Sanchez, Miguel Angel Ehrenzweig

    2005-01-01

    The OECD Programme on Educational Building, together with the Association of Higher Education Facilities Officers (APPA) and the OECD Programme on Institutional Management in Higher Education, organised an international conference on the planning, design and management of facilities for higher education institutions on April 24-27, 2005. The…

  7. Planning, Designing and Managing Higher Education Institutions

    ERIC Educational Resources Information Center

    Daigneau, William A.; Valenti, Mark S.; Ricciarini, Sylvana; Bender, Stephen O.; Alleyne, Nicole; Di Grappa, Michael; Duart, Josep M.; Lupianez, Francisco; Sanchez, Miguel Angel Ehrenzweig

    2005-01-01

    The OECD Programme on Educational Building, together with the Association of Higher Education Facilities Officers (APPA) and the OECD Programme on Institutional Management in Higher Education, organised an international conference on the planning, design and management of facilities for higher education institutions on April 24-27, 2005. The…

  8. Graduate Student Project: Operations Management Product Plan

    ERIC Educational Resources Information Center

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  9. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or...

  10. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or...

  11. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 6 2012-01-01 2012-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or its...

  12. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or...

  13. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or...

  14. 77 FR 47535 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the Sacramento Metropolitan Air Quality Management District portion of the California State Implementation Plan (SIP). This revision concerns...

  15. Productivity enhancement planning using participative management concepts

    NASA Technical Reports Server (NTRS)

    White, M. E.; Kukla, J. C.

    1985-01-01

    A productivity enhancement project which used participative management for both planning and implementation is described. The process and results associated with using participative management to plan and implement a computer terminal upgrade project where the computer terminals are used by research and development (R&D) personnel are reported. The upgrade improved the productivity of R&D personnel substantially, and their commitment of the implementation is high. Successful utilization of participative management for this project has laid a foundation for continued style shift toward participation within the organization.

  16. Productivity enhancement planning using participative management concepts

    NASA Technical Reports Server (NTRS)

    White, M. E.; Kukla, J. C.

    1985-01-01

    A productivity enhancement project which used participative management for both planning and implementation is described. The process and results associated with using participative management to plan and implement a computer terminal upgrade project where the computer terminals are used by research and development (R&D) personnel are reported. The upgrade improved the productivity of R&D personnel substantially, and their commitment of the implementation is high. Successful utilization of participative management for this project has laid a foundation for continued style shift toward participation within the organization.

  17. Total Quality Management: Increasing Productivity and Decreasing Costs.

    ERIC Educational Resources Information Center

    Heverly, Mary Ann; Cornesky, Robert A.

    1992-01-01

    Increasingly, higher education institutions are using Total Quality Management (TQM) as a vehicle for delivering cost-effective programs and services. The TQM philosophy is that quality can be improved by ceaselessly improving the processes that support the institution's mission. TQM is applicable to institutional research and planning as well as…

  18. The Newcastle (Australia) Airshed Management Action Plan (NAMAP)

    SciTech Connect

    Bridgman, H.A.; Cameron, C.

    1999-07-01

    The Newcastle (NSW Australia) Airshed Management Action Plan (NAMAP) has recently been completed, and is a forerunner toward urban air pollution management in Australia. NAMAP was developed by the Newcastle City Council in partnership with the community, science, and industry, as part of Council's commitments in it's environmental plan. Its purpose is to provide action strategies which will lead to improvements in Newcastle's air quality for future generations. Key issues addressed in the plan include: minimizing industrial emissions; reducing growth of vehicle kilometers traveled; improving energy efficiency; managing air quality from small and medium enterprises; reducing the impacts of solid fuel burning; improving management from councils own activities; making motor vehicle run clean; reviewing performance; and developing better solutions. Management strategies include community education, land use planning, regulation, economic incentives, monitoring, performance indicators and reporting. This paper describes the structure and development of NAMAP through stages from understanding the air pollution problem to recommending of action strategies for reduction and control. The development and implementation of NAMAP is particularly important as major changes in Newcastle's heavy industrial base will occur in the future, creating a restructuring in the relative importance of sources and primary emissions. NAMAP provides an excellent example of a cooperative effort to minimize air pollution problems in a small city.

  19. Primary urban energy-management-planning methodology

    SciTech Connect

    Revis, Joseph; Meador, Toni

    1980-11-01

    Metropolitan Dade County, Florida, developed a pragmatic, transferable methodology to assist local governments in attempts to develop and implement energy management plans. A summary of that work is presented and suggestions are provided to guide the application and refinement of a Primary Urban Energy Management Planning Methodology. The methodology provides local governments with the systematic approach for dealing with short and intermediate-term urban energy management problems while at the same time laying the groundwork for the formulation of long-term energy management activities. The five tasks of the methodology summarized are: organizing for the PEP process; performing an energy use and supply inventory; formulating energy management goals and objectives; developing strategies to achieve the energy management objectives; and monitoring and evaluation. (MCW)

  20. Integrated Cultural Resources Management Plan

    DTIC Science & Technology

    2001-07-01

    Trachinotus sp. (pompano). Marine invertebrates are comprised of the following five species: Callinectes sapidus (Blue crab), Crassostrea virginica ...Coordinate with other MCRD components to manage cu Advise and educate other MCRD components, contracto requirements. Monitor resource condition

  1. Implementing Total Quality Management in the School: Challenges and Opportunity.

    ERIC Educational Resources Information Center

    Murgatroyd, Stephen

    1993-01-01

    Total Quality Management (TQM) is not another"add-on" but a wholly reconceived approach to managing educational institutions. Some common start-up problems are lack of feasible leadership commitment, poor data and deployment plans, and inadequate managerial skills. Postlaunch problems include team and measurement mania, overzealous selling of…

  2. Spent Nuclear Fuel Project dose management plan

    SciTech Connect

    Bergsman, K.H.

    1996-03-01

    This dose management plan facilitates meeting the dose management and ALARA requirements applicable to the design activities of the Spent Nuclear Fuel Project, and establishes consistency of information used by multiple subprojects in ALARA evaluations. The method for meeting the ALARA requirements applicable to facility designs involves two components. The first is each Spent Nuclear Fuel Project subproject incorporating ALARA principles, ALARA design optimizations, and ALARA design reviews throughout the design of facilities and equipment. The second component is the Spent Nuclear Fuel Project management providing overall dose management guidance to the subprojects and oversight of the subproject dose management efforts.

  3. Quality of Life and Patient Satisfaction: ESRD Managed Care Demonstration

    PubMed Central

    Pifer, Trinh B.; Bragg-Gresham, Jennifer L.; Dykstra, Dawn M.; Shapiro, Jennifer R.; Oppenheimer, Caitlin Carroll; Gaylin, Daniel S.; Beronja, Nancy; Rubin, Robert J.; Held, Philip J.

    2003-01-01

    To study the effects of managed care on dialysis patients, we compared the quality of life and patient satisfaction of patients in a managed care demonstration with three comparison samples: fee-for-service (FFS) patients, managed care patients outside the demonstration, and patients in a separate national study. Managed care patients were less satisfied than FFS patients about access to health care providers, but more satisfied with the financial benefits (copayment coverage, prescription drugs, and nutritional supplements) provided under the demonstration managed care plan (MCP). After 1 year in the demonstration, patients exhibited statistically and clinically significant increases in quality of life scores. PMID:14628399

  4. The Best Laid Plans: An Examination of School Plan Quality and Implementation in a School Improvement Initiative

    ERIC Educational Resources Information Center

    Strunk, Katharine O.; Marsh, Julie A.; Bush-Mecenas, Susan C.; Duque, Matthew R.

    2016-01-01

    Purpose: A common strategy used in school improvement efforts is a mandated process of formal planning, yet little is known about the quality of plans or the relationship between plan quality and implementation. This mixed-methods article investigates plan quality, factors associated with plan quality, and the relationship between plan quality and…

  5. The Best Laid Plans: An Examination of School Plan Quality and Implementation in a School Improvement Initiative

    ERIC Educational Resources Information Center

    Strunk, Katharine O.; Marsh, Julie A.; Bush-Mecenas, Susan C.; Duque, Matthew R.

    2016-01-01

    Purpose: A common strategy used in school improvement efforts is a mandated process of formal planning, yet little is known about the quality of plans or the relationship between plan quality and implementation. This mixed-methods article investigates plan quality, factors associated with plan quality, and the relationship between plan quality and…

  6. Software configuration management plan for HANDI 2000 business management system

    SciTech Connect

    Wilson, D.

    1998-08-25

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software as well as any custom developed software. This plan establishes requirements and processes for uniform documentation control, system change control, systematic evaluation and coordination of HANDI 2000. This SCMP becomes effective as this document is acceptance and will provide guidance through implementation efforts.

  7. Total Quality Management in Education. Second Edition.

    ERIC Educational Resources Information Center

    Sallis, Edward

    Quality is at the top of most agendas, and improving quality is probably the most important task facing any institution. In addition, quality is difficult to define or measure. This book, the second edition of "Total Quality Management in Education," introduces the key concepts of Total Quality Management (TQM) and demonstrates how they…

  8. Total Quality Management in Education. Second Edition.

    ERIC Educational Resources Information Center

    Sallis, Edward

    Quality is at the top of most agendas, and improving quality is probably the most important task facing any institution. In addition, quality is difficult to define or measure. This book, the second edition of "Total Quality Management in Education," introduces the key concepts of Total Quality Management (TQM) and demonstrates how they…

  9. Management plan for Facility Effluent Monitoring Plan activities

    SciTech Connect

    Nickels, J.M.; Pratt, D.R.

    1991-08-01

    The DOE/RL 89-19, United States Department of Energy-Richland Operations Office Environmental Protection Implementation Plan (1989), requires the Hanford Site to prepare an Environmental Monitoring Plan (EMP) by November 9, 1991. The DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (1991), provides additional guidance and requires implementation of the EMP within 36 months of the effective data of the rule. DOE Order 5400.1, General Environmental Protection Program, requires each US Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials to prepare an EMP. This EMP is to identify and discuss two major activities: (1) effluent monitoring and (2) environmental surveillance. At the Hanford Site, the site-wide EMP will consist of the following elements: (1) A conceptual plan addressing effluent monitoring and environmental surveillance; (2) Pacific Northwest Laboratory (PNL) site-wide environmental surveillance program; (3) Westinghouse Hanford Company (Westinghouse Hanford) effluent monitoring program consisting of the near-field operations environmental monitoring activities and abstracts of each Facility Effluent Monitoring Plan (FEMP). This management plan addresses the third of these three elements of the EMP, the FEMPs.

  10. Myopia management: multihospital portfolio planning.

    PubMed

    Irish, G G

    1987-10-01

    The acquisition and divestiture of organizational business units demonstrate management's strategy in response to an evolving marketplace. From a strategic perspective, the most significant danger to a corporation is not having the "right" portfolio of businesses or products to respond to the marketplace. This article describes a conceptual model that a multihospital system executive might use to determine the growth and diversification of the organization's portfolio of businesses. The model involves the application of market, financial, and microeconomic theories in a logical sequence to assist management in making business acquisition and divestiture decisions.

  11. 43 CFR 1610.1 - Resource management planning guidance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Resource management planning guidance... Resource Management Planning § 1610.1 Resource management planning guidance. (a) Guidance for preparation and amendment of resource management plans may be provided by the Director and State Director,...

  12. 43 CFR 1610.1 - Resource management planning guidance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Resource management planning guidance... Resource Management Planning § 1610.1 Resource management planning guidance. (a) Guidance for preparation and amendment of resource management plans may be provided by the Director and State Director,...

  13. Human Capital Management Plan, 2004

    ERIC Educational Resources Information Center

    US Department of Education, 2004

    2004-01-01

    The Department of Education is a leader in improving the quality of education and raising expectations of what students can accomplish. The Department has promised to leave no child behind in order to ensure that all Americans can use their knowledge and skills to lead productive lives, enhance communities, and participate fully in the economy. To…

  14. 76 FR 27086 - Final General Management Plan, Wilderness Management Plan, and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... National Park Service Final General Management Plan, Wilderness Management Plan, and Final Environmental Impact Statement; Apostle Islands National Lakeshore AGENCY: National Park Service, Department of the... 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)), the National Park...

  15. 48 CFR 37.604 - Quality assurance surveillance plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Quality assurance... SPECIAL CATEGORIES OF CONTRACTING SERVICE CONTRACTING Performance-Based Acquisition 37.604 Quality assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans...

  16. ISO 9000 Quality Management System

    NASA Astrophysics Data System (ADS)

    Hadjicostas, Evsevios

    The ISO 9000 series describes a quality management system applicable to any organization. In this chapter we present the requirements of the standard in a way that is as close as possible to the needs of analytical laboratories. The sequence of the requirements follows that in the ISO 9001:2008 standard. In addition, the guidelines for performance improvement set out in the ISO 9004 are reviewed. Both standards should be used as a reference as well as the basis for further elaboration.

  17. Environmental Restoration Quality Program Implementation Plan. Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  18. The Role of the Quality Enhancement Plan in Engendering a Culture of Assessment

    ERIC Educational Resources Information Center

    Loughman, Thomas P.; Hickson, Joyce; Sheeks, Gina L.; Hortman, J. William

    2008-01-01

    During the past two decades, colleges and universities have used best practices from corporate management such as total quality management, strategic planning, management by objectives, benchmarking, data warehousing, and performance indicators. Many institutions of higher learning now have adopted comprehensive and multifaceted approaches to…

  19. The Role of the Quality Enhancement Plan in Engendering a Culture of Assessment

    ERIC Educational Resources Information Center

    Loughman, Thomas P.; Hickson, Joyce; Sheeks, Gina L.; Hortman, J. William

    2008-01-01

    During the past two decades, colleges and universities have used best practices from corporate management such as total quality management, strategic planning, management by objectives, benchmarking, data warehousing, and performance indicators. Many institutions of higher learning now have adopted comprehensive and multifaceted approaches to…

  20. Quality assurance planning for lunar Mars exploration

    NASA Technical Reports Server (NTRS)

    Myers, Kay

    1991-01-01

    A review is presented of the tools and techniques required to meet the challenge of total quality in the goal of traveling to Mars and returning to the moon. One program used by NASA to ensure the integrity of baselined requirements documents is configuration management (CM). CM is defined as an integrated management process that documents and identifies the functional and physical characteristics of a facility's systems, structures, computer software, and components. It also ensures that changes to these characteristics are properly assessed, developed, approved, implemented, verified, recorded, and incorporated into the facility's documentation. Three principal areas are discussed that will realize significant efficiencies and enhanced effectiveness, change assessment, change avoidance, and requirements management.