  1. Region 7 Quality Management Plan

    EPA Pesticide Factsheets

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  2. Illinois water quality management plan

    SciTech Connect

    Not Available

    1992-12-01

    The report describes the purpose of the plan to consolidate and streamline portions of approved state and areawide water quality management (WQM) plans in order to facilitate their usage in the operations of all designated WQM agencies. The report identifies both point and nonpoint pollution sources, reviews policies and regulations already in place and makes recommendations for pollution prevention and control. Information on the plan's management structure is also included.

  3. Waste Management Quality Assurance Plan

    SciTech Connect

    Not Available

    1993-11-30

    Lawrence Berkeley Laboratory`s Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department`s activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A.

  4. Total quality management program planning

    SciTech Connect

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  5. Checklist for Reviewing EPA Quality Management Plans

    EPA Pesticide Factsheets

    This checklist will be used to review the Quality Management Plans (QMPs) that are submitted to the Quality Staff of the Office of Environmental Information (OEI) for Agency review under EPA Order 5360.1 A2.

  6. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... and certified and approved updates to those plans. Continuing water quality planning shall be...

  7. Total quality management -- Remedial actions planning program

    SciTech Connect

    Petty, J.L.; Horne, T.E.

    1989-01-01

    This paper describes the management approach being taken within the Hazardous Waste Remedial Actions Program (HAZWRAP) Support Contractor Office (SCO) to ensure quality of services in a highly competitive waste management environment. An overview is presented of the contractor support role assigned to Martin Marietta Energy Systems, Inc., by the Department of Energy (DOE) national program for managing hazardous waste. The HAZWRAP SCO mission, organizational structure, and major programs are outlined, with emphasis on waste management planning for the DOE Work for Others (WFO) Program. The HAZWRAP SCO provides waste management technical support, via interagency agreements between DOE and various Department of Defense (DOD) agencies for DOD sponsors planning remedial response actions. The remainder of the paper focuses on how the concept of Total Quality Management is applied to the HAZWRAP Remedial Actions Planning (RAP) Program. The management challenge is to achieve quality on a ''system'' basis where all functional elements of program management synergistically contribute to the total quality of the effort. The quality assurance (QA) program requirements applied to the RAP Program and its subcontractors are discussed. The application of management principles in the areas of program management, procurement, and QA to achieve total quality is presented. 3 refs.

  8. Quality Management Plan for the Environmental Assessment and Innovation Division

    EPA Pesticide Factsheets

    Quality management plan (QMP) which identifies the mission, roles, responsibilities of personnel with regard to quality assurance and quality management for the environmental assessment and innovation division.

  9. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management...

  10. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management...

  11. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management...

  12. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management...

  13. EPA Region 3 Quality Management Plans

    EPA Pesticide Factsheets

    Has links to resources that describe the Region's Quality Assurance Program, which is a collection of the Region's ongoing quality assurance (QA) policies, procedures, responsibilities and management systems.

  14. Project Hanford management contract quality improvement project management plan

    SciTech Connect

    ADAMS, D.E.

    1999-03-25

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

  15. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management...

  16. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management...

  17. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management...

  18. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan...

  19. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to:...

  20. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan...

  1. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to:...

  2. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water...

  3. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water...

  4. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water...

  5. Hanford Sampling Quality Management Plan (HSQMP)

    SciTech Connect

    Hyatt, J.E.

    1995-06-01

    HSQMP establishes quality requirements in response to DOE Order 5700. 6C and to 10 Code of Federal Regulations 830.120. HSQMP is designed to meet the needs of Richland Operations Office for controlling the quality of services provided by sampling operations. It is issued through the Analytical Services Program of the Waste Programs Division. This document describes the Environmental Sampling and Analysis Program activities considered to represent the best management activities necessary to achieve a sampling program with adequate control.

  6. QUALITY MANAGEMENT PLAN FOR THE NATIONAL CHILDREN'S STUDY

    EPA Science Inventory

    EPA has taken the lead, in consort with NIH, in developing the Quality Management Plan (QMP) for the National Children's Study (NCS); the QMP will delineate a systematic planning process for the implementation of the NCS. The QMP will state the goals and objectives of the NCS, th...

  7. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... From the Federal Register Online via the Government Publishing Office ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA...

  8. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... County Air Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality...

  9. POSTER FOR NRMRL QUALITY MANAGEMENT PLAN (QMP) TRAINING COURSE

    EPA Science Inventory


    NRMRL QMP Training Course
    Contact: Lauren Drees, NRMRL/STD (drees.lauren@epa.gov)

    NRMRL has developed a computer-based course to train personnel in the requirements of the NRMRL Quality Management Plan (QMP). This training course was developed using Trainersoft s...

  10. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-10

    ... AGENCY 40 CFR Part 52 Approval of Air Quality Implementation Plans; California; South Coast Air Quality... Air Quality Management District regarding specific implementation of parts of the Prevention of Significant Deterioration program. (i) Incorporation by reference. (A) South Coast Air Quality...

  11. 77 FR 52277 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-29

    ... AGENCY 40 CFR Part 52 Approval of Air Quality Implementation Plans; California; South Coast Air Quality... submitted for the South Coast Air Quality Management District (District) portion of the California State... the prevention of significant deterioration of air quality and visibility protection. The purpose...

  12. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... revisions to the Butte County Air Quality Management District (BCAQMD) and Sacramento Metropolitan...

  13. 77 FR 65133 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... Identification of plan. * * * * * (c) * * * (379) * * * (i) * * * (E) Mojave Desert Air Quality Management... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA...

  14. Procedure for assessing visual quality for landscape planning and management

    NASA Astrophysics Data System (ADS)

    Gimblett, H. Randal; Fitzgibbon, John E.; Bechard, Kevin P.; Wightman, J. A.; Itami, Robert M.

    1987-07-01

    Incorporation of aesthetic considerations in the process of landscape planning and development has frequently met with poor results due to its lack of theoretical basis, public involvement, and failure to deal with spatial implications. This problem has been especially evident when dealing with large areas, for example, the Adirondacks, Scenic Highways, and National Forests and Parks. This study made use of public participation to evaluate scenic quality in a portion of the Niagara Escarpment in Southern Ontario, Canada. The results of this study were analyzed using the visual management model proposed by Brown and Itami (1982) as a means of assessing and evaluating scenic quality. The map analysis package formulated by Tomlin (1980) was then applied to this assessment for the purpose of spatial mapping of visual impact. The results of this study illustrate that it is possible to assess visual quality for landscape/management, preservation, and protection using a theoretical basis, public participation, and a systematic spatial mapping process.

  15. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of...

  16. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of...

  17. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of...

  18. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of...

  19. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of...

  20. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    SciTech Connect

    Riddle, Donna L.

    2007-05-03

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, “Quality Assurance Requirements,” ANSI/ASQC E4-2004, “Quality Systems for Environmental Data and Technology Programs – Requirements with Guidance for Use,” and ISO 14001-2004, “Environmental Management Systems,” have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, “Quality Assurance Program,” identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, “QA Program Implementation,” identifies the TAC organizations that have responsibility for

  1. 77 FR 11990 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District and Yolo-Solano Air Quality Management District AGENCY: Environmental Protection Agency... Quality Management District (MDAQMD) and Yolo-Solano Air Quality Management District (YSAQMD) portions...

  2. 77 FR 12526 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency... Quality Management District (AVAQMD) and Mojave Desert Air Quality Management District (MDAQMD) portion...

  3. Total Quality Management Implementing Plan for Human Resource Management

    DTIC Science & Technology

    1989-04-01

    ainilO reo)U,;rments for their organiz7at,.ons and provide information o-n course scnIeCUies and ;7ompletions. A new subsystem for labor management... estr ict,_ve interoretations of job-relatedness in approving Agency-+unded training ard aettli~ ’-he best reSult 4or all concerned; increase cross

  4. Quality Assurance Program Plan (QAPP) Waste Management Project

    SciTech Connect

    VOLKMAN, D.D.

    1999-10-27

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

  5. 76 FR 44535 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality... proposing to approve revisions to the Northern Sierra Air Quality Management District (NSAQMD),...

  6. 77 FR 12495 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency... the Antelope Valley Air Quality Management District (AVAQMD) and Mojave Desert Air Quality...

  7. 77 FR 39181 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ... Management District (MDAQMD) and Yolo-Solano Air Quality Management District (YSAQMD) AGENCY: Environmental... Identification of plan. * * * * * (c) * * * (364) * * * (i) * * * (D) Mojave Desert Air Quality Management...) * * * (F) Yolo-Solano Air Quality Management District. (1) Rule 2.43, ``Biomass Boilers,'' adopted...

  8. Waste management Quality Assurance Implementing Management Plan (QAIMP). Revision 1

    SciTech Connect

    Not Available

    1992-06-01

    This report contains a summary of the groundwater and surface-water quality monitoring activities to be performed during the 1993 calendar year at the Department of Energy Y- 12 Plant in Oak Ridge, Tennessee (Figure 1). Monitoring activities will be performed in three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (BCHR), (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (UEFPCHR), and (3) the Chestnut Ridge Hydrogeologic Regime (CRHR). The BCHR and UEFPCHR are located within Bear Creek Valley (BCV) and the CRHR is located south of the Y-12 Plant on Chestnut Ridge (Figure 2).

  9. Waste management Quality Assurance Implementing Management Plan (QAIMP)

    SciTech Connect

    Tung, Kam

    1992-06-01

    This report contains a summary of the groundwater and surface-water quality monitoring activities to be performed during the 1993 calendar year at the Department of Energy Y- 12 Plant in Oak Ridge, Tennessee (Figure 1). Monitoring activities will be performed in three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (BCHR), (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (UEFPCHR), and (3) the Chestnut Ridge Hydrogeologic Regime (CRHR). The BCHR and UEFPCHR are located within Bear Creek Valley (BCV) and the CRHR is located south of the Y-12 Plant on Chestnut Ridge (Figure 2).

  10. Quality Assurance Program Plan (QAPP) Waste Management Project

    SciTech Connect

    HORHOTA, M.J.

    2000-12-21

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence.

  11. 78 FR 58459 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management... Quality Management District (SCAQMD) and Ventura County Air Pollution Control District (VCAPCD)...

  12. 77 FR 1895 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-12

    ... action, we are proposing to approve South Coast Air Quality Management District (SCAQMD) Rule 317.... South Coast Air Quality Management District There are two 1-hour ozone nonattainment areas within the... Quality Management Plan, as revised in 1999.\\9\\ The approved 1-hour ozone SIP in the Southeast...

  13. 78 FR 25011 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management... Quality Management District (SCAQMD) and Ventura County Air Pollution Control District (VCAPCD)...

  14. Corporate management of quality in employee health plans.

    PubMed

    Maxwell, James; Temin, Peter

    2003-01-01

    As large companies move their employees into managed care, they must concern themselves with the quality and price of their employees' health care. Based on a survey of Fortune 500 companies, we show that most are integrating several aspects of quality into their purchasing and contracting decisions by focusing on three dimensions--customer service, network composition, and clinical quality. Companies focus on the customer service dimension while the medical community emphasizes clinical quality.

  15. 76 FR 30896 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the... overwhelmingly formed as a secondary pollutant. (South Coast 2007 Air Quality Management Plan, page ES-9... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  16. 78 FR 59840 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... of plan. * * * * * (c) * * * (428) * * * (i) * * * (B) Antelope Valley Air Quality Management...) * * * (i) * * * (B) Antelope Valley Air Quality Management District. (1) Rule 431.1, ``Sulfur Content of... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air...

  17. 78 FR 7703 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    .... SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District (SCAQMD... designed to implement the 2003 Air Quality Management Plan (AQMP) control measure, WST-01, and establish... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  18. 76 FR 54384 - California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-01

    ... AGENCY 40 CFR Part 52 California State Implementation Plan, South Coast Air Quality Management District... to the California State Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District (SCAQMD) Rule 1143, Consumer Paint Thinner & Multi-Purpose Solvents and Rule 1144,...

  19. ENVIRONMENTAL TECHNOLOGY VERIFICATION PROGRAM: QUALITY AND MANAGEMENT PLAN FOR THE PILOT PERIOD (1995-2000)

    EPA Science Inventory

    Based upon the structure and specifications in ANSI/ASQC E4-1994, Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs, the Environmental Technology Verification (ETV) program Quality and Management Plan (QMP) f...

  20. 77 FR 26475 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air Pollution...

  1. 78 FR 21581 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... the Antelope Valley Air Quality Management District (AVAQMD), Monterey Bay Unified Air...

  2. Quality assurance management plan (QAPP) special analytical support (SAS)

    SciTech Connect

    LOCKREM, L.L.

    1999-05-20

    It is the policy of Special Analytical Support (SAS) that the analytical aspects of all environmental data generated and processed in the laboratory, subject to the Environmental Protection Agency (EPA), U.S. Department of Energy or other project specific requirements, be of known and acceptable quality. It is the intention of this QAPP to establish and assure that an effective quality controlled management system is maintained in order to meet the quality requirements of the intended use(s) of the data.

  3. Quality-assurance and data-management plan for water-quality activities in the Kansas Water Science Center, 2014

    USGS Publications Warehouse

    Rasmussen, Teresa J.; Bennett, Trudy J.; Foster, Guy M.; Graham, Jennifer L.; Putnam, James E.

    2014-01-01

    As the Nation’s largest water, earth, and biological science and civilian mapping information agency, the U.S. Geological Survey is relied on to collect high-quality data, and produce factual and impartial interpretive reports. This quality-assurance and data-management plan provides guidance for water-quality activities conducted by the Kansas Water Science Center. Policies and procedures are documented for activities related to planning, collecting, storing, documenting, tracking, verifying, approving, archiving, and disseminating water-quality data. The policies and procedures described in this plan complement quality-assurance plans for continuous water-quality monitoring, surface-water, and groundwater activities in Kansas.

  4. 77 FR 2469 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... to the Antelope Valley Air Quality Management District (AVAQMD) and Imperial County Air Pollution.... * * * * * (G) Antelope Valley Air Quality Management District. (1) Rule 1134, ``Stationary Gas...

  5. Sunway Medical Laboratory Quality Control Plans Based on Six Sigma, Risk Management and Uncertainty.

    PubMed

    Jairaman, Jamuna; Sakiman, Zarinah; Li, Lee Suan

    2017-03-01

    Sunway Medical Centre (SunMed) implemented Six Sigma, measurement uncertainty, and risk management after the CLSI EP23 Individualized Quality Control Plan approach. Despite the differences in all three approaches, each implementation was beneficial to the laboratory, and none was in conflict with another approach. A synthesis of these approaches, built on a solid foundation of quality control planning, can help build a strong quality management system for the entire laboratory.

  6. Standard Review Plan for Environmental Restoration Program Quality Management Plans. Revision 2

    SciTech Connect

    Not Available

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements.

  7. 77 FR 66780 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-07

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  8. 78 FR 18853 - Revision to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... taking direct final action to approve a revision to the South Coast Air Quality Management District...) * * * (411) * * * (i) * * * (F) South Coast Air Quality Management District. (1) Rule 463, ``Organic Liquid... AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, South Coast Air...

  9. 75 FR 61367 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  10. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... proposing to approve a revision to the South Coast Air Quality Management District portion of the California... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan; South Coast Air...

  11. 77 FR 58076 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  12. 76 FR 70888 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of the... Quality Management District--SCAQMD) (1) Rule 1143, ``Consumer Paint Thinners & Multi-purpose Solvents... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  13. 76 FR 78829 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ... taking direct final action to approve a revision to the South Coast Air Quality Management District... Reference (A) South Coast Air Quality Management District (1) Rule 2005, ``New Source Review for RECLAIM... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  14. 76 FR 50128 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  15. 78 FR 5305 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  16. 75 FR 46845 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the South Coast Air Quality Management...

  17. 77 FR 12493 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... River Air Quality Management District. (1) Rule 3.22, ``Internal Combustion Engines,'' adopted on June... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Feather River Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA...

  18. 77 FR 32398 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve a revision to the South Coast Air Quality Management...

  19. 78 FR 56639 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of...

  20. 76 FR 41744 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  1. 78 FR 18244 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  2. 75 FR 32293 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the South Coast Air Quality Management...

  3. 77 FR 13495 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  4. 76 FR 47074 - Revision to the California State Implementation Plan; South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... taking direct final action to approve a revision to the South Coast Air Quality Management District... Air Quality Management District (SCAQMD) Rule 1175, adopted on November 5, 2010, and submitted by the... AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan; South Coast Air...

  5. 78 FR 59249 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  6. 78 FR 30768 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  7. 75 FR 25798 - Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Yolo-Solano Air Quality Management District (YSAQMD) portion of...

  8. 76 FR 78871 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of...

  9. 75 FR 25775 - Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... AGENCY 40 CFR Part 52 Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing disapproval of a revision to the South Coast Air Quality Management District (SCAQMD) portion...

  10. 77 FR 32483 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District portion of the...

  11. 75 FR 32353 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District portion of the...

  12. 78 FR 49925 - Revisions to California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... the Antelope Valley Air Quality Air Management District (AVAQMD) and Ventura County Air Pollution... AGENCY 40 CFR Part 52 Revisions to California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air Pollution Control District AGENCY: Environmental Protection...

  13. 78 FR 49992 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... Quality Management District (AVAQMD) and Ventura County Air Pollution Control District (VCAPCD) portions... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air Pollution Control District AGENCY: Environmental Protection...

  14. 76 FR 41717 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the South Coast Air Quality Management...

  15. 75 FR 46880 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  16. 78 FR 37757 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  17. 76 FR 72142 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-22

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District portion of the...

  18. North Coast Unified Air Quality Management District, California; Final Limited Federal Implementation Plan

    EPA Pesticide Factsheets

    EPA is finalizing a limited Federal Implementation Plan (FIP) under the Clean Air Act (CAA or Act) to apply to the North Coast Unified Air Quality Management District (North Coast Unified AQMD or District) in California.

  19. Transforming an EPA QA/R-2 quality management plan into an ISO 9002 quality management system.

    PubMed

    Kell, R A; Hedin, C M; Kassakhian, G H; Reynolds, E S

    2001-01-01

    The Environmental Protection Agency's (EPA) Office of Emergency and Remedial Response (OERR) requires environmental data of known quality to support Superfund hazardous waste site projects. The Quality Assurance Technical Support (QATS) Program is operated by Shaw Environmental and Infrastructure, Inc. to provide EPA's Analytical Operations Center (AOC) with performance evaluation samples, reference materials, on-site laboratory auditing capabilities, data audits (including electronic media data audits), methods development, and other support services. The new QATS contract awarded in November 2000 required that the QATS Program become ISO 9000 certified. In a first for an EPA contractor, the QATS staff and management successfully transformed EPA's QA/R-2 type Quality Management Plan into a Quality Management System (QMS) that complies with the requirements of the internationally recognized ISO 9002 standard and achieved certification in the United States, Canada, and throughout Europe. The presentation describes how quality system elements of ISO 9002 were implemented on an already existing quality system. The psychological and organizational challenges of the culture change in QATS' day-to-day operations will be discussed for the benefit of other ISO 9000 aspirants.

  20. 76 FR 40303 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing a limited approval and limited disapproval of revisions to the South Coast Air Quality...

  1. 76 FR 50891 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA... sources, to achieve emissions reductions milestones, to attain and maintain ambient air quality...

  2. 77 FR 12491 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... revisions to the Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air..., 2011, the submittal for Antelope Valley AQMD and SJVUAPCD Negative Declarations submitted on June...

  3. 77 FR 12527 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air...

  4. 77 FR 26448 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... approve revisions to the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air... rules were developed as part of the local agency's program to control these pollutants. Antelope...

  5. 78 FR 21545 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) and Monterey Bay Unified... developed as part of the local agency's program to control these pollutants. Antelope Valley AQMD Rule...

  6. 77 FR 53773 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does...

  7. Double Shell Tanks (DST) and Waste Feed Delivery Project Management Quality Affecting Procedures Management Plan

    SciTech Connect

    LUND, D.P.

    2000-09-25

    The purpose of the Double Shell Tanks (DST) and Waste Feed Delivery (WFD) Management Assessment Plan is to define how management assessments within DST h WFD will be conducted. The plan as written currently includes only WFD Project assessment topics. Other DST and WFD group assessment topics will be added in future revisions.

  8. VERIFICATION TESTING OF AIR POLLUTION CONTROL TECHNOLOGY QUALITY MANAGEMENT PLAN

    EPA Science Inventory

    This document is the basis for quality assurance for the Air Pollution Control Technology Verification Center (APCT Center) operated under the U.S. Environmental Protection Agency (EPA). It describes the policies, organizational structure, responsibilities, procedures, and qualit...

  9. 76 FR 76115 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Feather River Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing a limited approval and limited disapproval of revisions to the Feather River Air...

  10. 77 FR 11992 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing a limited approval and limited disapproval of revisions to the Mojave Desert Air...

  11. 76 FR 55581 - Revision to the California State Implementation Plan; Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-08

    ... taking direct final action to approve a revision to the Yolo-Solano Air Quality Management District... did the State submit? We are approving Yolo-Solano Air Quality Management District (YSAQMD) Rule 2.41... Identification of plan. * * * * * (c) * * * (364) * * * (i) * * * (C) Yolo-Solano Air Quality Management...

  12. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect

    Fix, N. J.

    2008-02-20

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  13. LANDSAT supports data needs for EPA 208 planning. [water quality control and waste treatment management

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Excerpts from federal legislation and regulations mandating areawide waster treatment management as a means of restoring and maintaining the integrity of the nation's water are presented along with requirements for grants to the states for water quality planning, management, and implementation. Experiences using LANDSAT to identify nonpoint sources of water pollution as well as land/use/land cover features in South Dakota, Kentucky, Georgia, New Jersey, and Texas are described. Present activities suggest that this type of remote sensing is an efficient, effective tool for areawide water quality planning. Interaction with cognizant federal, state, and local government personnel involved in EPA section 208 planning activities can guide the development of new capabilities and enhance their utility and prospect for use.

  14. 34 CFR 611.2 - What management plan must be included in a Teacher Quality Enhancement Grants Program application?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... TEACHER QUALITY ENHANCEMENT GRANTS PROGRAM General Provisions § 611.2 What management plan must be... 34 Education 3 2013-07-01 2013-07-01 false What management plan must be included in a Teacher Quality Enhancement Grants Program application? 611.2 Section 611.2 Education Regulations of the...

  15. 34 CFR 611.2 - What management plan must be included in a Teacher Quality Enhancement Grants Program application?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... TEACHER QUALITY ENHANCEMENT GRANTS PROGRAM General Provisions § 611.2 What management plan must be... 34 Education 3 2014-07-01 2014-07-01 false What management plan must be included in a Teacher Quality Enhancement Grants Program application? 611.2 Section 611.2 Education Regulations of the...

  16. 34 CFR 611.2 - What management plan must be included in a Teacher Quality Enhancement Grants Program application?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... TEACHER QUALITY ENHANCEMENT GRANTS PROGRAM General Provisions § 611.2 What management plan must be... 34 Education 3 2012-07-01 2012-07-01 false What management plan must be included in a Teacher Quality Enhancement Grants Program application? 611.2 Section 611.2 Education Regulations of the...

  17. 34 CFR 611.2 - What management plan must be included in a Teacher Quality Enhancement Grants Program application?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... TEACHER QUALITY ENHANCEMENT GRANTS PROGRAM General Provisions § 611.2 What management plan must be... 34 Education 3 2011-07-01 2011-07-01 false What management plan must be included in a Teacher Quality Enhancement Grants Program application? 611.2 Section 611.2 Education Regulations of the...

  18. 75 FR 25778 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... taking direct final action to approve revisions to the Yolo-Solano Air Quality Management District... Identification of plan. * * * * * (c) * * * (377) * * * (i) * * * (B) Yolo Solano Air Quality Management District... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air...

  19. 34 CFR 611.2 - What management plan must be included in a Teacher Quality Enhancement Grants Program application?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TEACHER QUALITY ENHANCEMENT GRANTS PROGRAM General Provisions § 611.2 What management plan must be... 34 Education 3 2010-07-01 2010-07-01 false What management plan must be included in a Teacher Quality Enhancement Grants Program application? 611.2 Section 611.2 Education Regulations of the...

  20. Sustainable water quality management framework and a strategy planning system for a river basin.

    PubMed

    Chen, Ching-Ho; Liu, Wei-Lin; Leu, Horng-Guang

    2006-12-01

    In Taiwan, the authorities have spent years working on remedying polluted rivers. Generally, the remediation planning works are divided into two phases. During the first phase, the allowed pollution discharge quantity and abatement quantity of each drainage zone, including the assimilative capacity, are generated based on the total river basin. In the second phase, the abatement action plans for each pollution source in each drainage zone are respectively devised by the related organizations based on the strategies generated during the first phase. However, the effectiveness of linking the two phases is usually poor. Highly integrated performances are not always achieved because the separate two-phase method does not take system and management thinking into consideration in the planning stage. This study pioneers the use of the Managing for Results (MFR) method in planning strategies and action plans for river water quality management. A sustainable management framework is proposed based on the concept and method of MFR, Management Thinking, and System Analysis. The framework, consisting of planning, implementation, and controlling stages, systematically considers the relationships and interactions among four factors: environment, society, economy, and institution, based on the principles of sustainable development. Based on the framework, the Modified Bounded Implicit Enumeration algorithm, which is used as a solving method, is combined with Visual Basic software and MS Excel to develop a computer system for strategy planning. The Shetzu River, located in northern Taiwan, is applied as a case study. According to the theoretical, practical, and regulatory considerations, the result-oriented objectives are defined to first improve the pollution length of the Shetzu River in specific remediation periods to finally meet regulated water quality standards. The objectives are then addressed as some of the constraints for the strategy planning model. The model objective

  1. Planning for Quality Data

    SciTech Connect

    Robert P. Evans

    2005-05-01

    The assurance of data quality can be a complex process requiring careful planning. The planning process described in this paper uses Data Quality Objectives as the foundation. The described process considers three steps: project requirement identification, definition of the information necessary to answer the questions, and data collection and management. Since sufficient levels of documentation are required at all levels, uncertainty analysis, traceability and custody, data maintenance, and data evaluation and review are also discussed.

  2. Planning For Quality Data

    SciTech Connect

    Robert P. Evans

    2005-05-01

    The assurance of data quality can be a complex process requiring careful planning. The planning process described in this paper uses Data Quality Objectives as the foundation. The described process considers three steps: project requirement identification, definition of the information necessary to answer the questions, and data collection and management. Since sufficient levels of documentation are required at all levels, uncertainty analysis, traceability and custody, data maintenance, and data evaluation and review are also discussed.

  3. Parking and routing information system phase 1 evaluation -- Data management and quality control/quality assurance plans

    SciTech Connect

    Carter, R.J.

    1997-01-01

    A parking and routing information system (PARIS) is being designed and deployed at a test site on the Mountain Home Veterans Administration campus in Johnson City, Tennessee using three sensor technologies. The purpose of the PARIS project is to demonstrate innovative integration of vehicle sensing technologies with parking management strategies to improve mobility and relieve congestion associated with a growing medical technology complex. Oak Ridge National Laboratory`s (ORNL) role during phase 1 of the project is to act as the independent evaluator. This technical memorandum presents two plans, Data Management Plan and Quality Control/Quality Assurance (QC/QA) Plan, which were developed to support ORNL`s responsibilities and functions. The purposes of the Data Management Plan are to coordinate the data needs which will be addressed in four individual evaluation test plans and to deal with the data issues facing the phase 1 evaluation as a whole. The objectives of the QC/QA Plan are to ensure that the evaluation is conducted properly, to guarantee that the data which will be collected are valid and properly analyzed, and to make sure that the test results are accurately recorded and reported. The evaluation will be performed through the execution of four integrated studies (system performance, user acceptance, institutional and business issues, and transportation systems). The phase 1 evaluation data will be collected from 24 sources. Three databases will be established based upon these data (project team database, distributed database processor, and evaluator database).

  4. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect

    Fix, N. J.

    2009-04-03

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

  5. 77 FR 23133 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ... taking direct final action to approve revisions to the Yolo-Solano Air Quality Management District (Yolo.... * * * * * (381) * * * (i) * * * (I) Yolo-Solano Air Quality Management District. (1) Rule 2.3, ``Ringelmann Chart... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air...

  6. 76 FR 55621 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-08

    ... proposing to approve a revision to the Yolo-Solano Air Quality Management District portion of the California... local rule: Yolo-Solano Air Quality Management District Rule 2.41, Expandable Polystyrene Manufacturing... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air...

  7. 75 FR 19923 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Yolo-Solano Air Quality Management District (YSAQMD) portion of...

  8. 77 FR 23193 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Yolo-Solano Air Quality Management District portion of the...

  9. 75 FR 37308 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-29

    ... finalizing approval of revisions to the Yolo-Solano Air Quality Management District (YSAQMD) portion of the...) * * * (i) * * * (C) Yolo Solano Air Quality Management District (1) Rule 3.21, ``Rice Straw Emission... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air...

  10. Nurse care manager contribution to quality of care in a dual-eligible special needs plan.

    PubMed

    Roth, Carol P; Ganz, David A; Nickles, Lorraine; Martin, David; Beckman, Robin; Wenger, Neil S

    2012-07-01

    We evaluated the quality of care provided to older patients with complex needs in a dual-eligible, community-based Medicare Special Needs Plan that used a nurse care manager model. Care provided by physicians was substantially supplemented by nurse care managers, as measured by Assessing Care of Vulnerable Elders quality indicators. We describe selected nurse care manager activities for six geriatric conditions (falls, dementia, depression, nutrition, urinary incontinence, and end-of-life care) during provision of patient care coordination and management for patients in the highest decile of clinical complexity. We identify areas of high nurse performance (i.e., falls screening, functional assessment, behavioral interventions for dementia problems, advance care planning) and areas of potential missed opportunities (i.e., follow up for new memory problems, targeted dementia counseling, nutrition, and behavioral approaches to urinary incontinence). Increasing the collaborative interaction between nurses providing care in this model and physicians has the potential to enhance nurses' contributions to primary care for vulnerable older adults.

  11. A theoretical framework for the episodic-urban air quality management plan ( e-UAQMP)

    NASA Astrophysics Data System (ADS)

    Gokhale, Sharad; Khare, Mukesh

    The present research proposes the local urban air quality management plan which combines two different modelling approaches (hybrid model) and possesses an improved predictive ability including the 'probabilistic exceedances over norms' and their 'frequency of occurrences' and so termed, herein, as episodic-urban air quality management plan ( e-UAQMP). The e-UAQMP deals with the consequences of 'extreme' concentrations of pollutant, mainly occurring at urban 'hotspots' e.g. traffic junctions, intersections and signalized roadways and are also influenced by complexities of traffic generated 'wake' effects. The e-UAQMP (based on probabilistic approach), also acts as an efficient preventive measure to predict the 'probability of exceedances' so as to prepare a successful policy responses in relation to the protection of urban environment as well as disseminating information to its sensitive 'receptors'. The e-UAQMP may be tailored to the requirements of the local area for the policy implementation programmes. The importance of such policy-making framework in the context of current air pollution 'episodes' in urban environments is discussed. The hybrid model that is based on both deterministic and stochastic based approaches predicting the 'average' as well as 'extreme' concentration distribution of air pollutants together in form of probability has been used at two air quality control regions (AQCRs) in the Delhi city, India, in formulating and executing the e-UAQMP— first, the income tax office (ITO), one of the busiest signalized traffic intersection and second, the Sirifort, one of the busiest signalized roadways.

  12. 77 FR 74372 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... action, EPA is finalizing approval of South Coast Air Quality Management District (SCAQMD) Rule 317... the Act, the ``principles'' behind that language, or South Coast Air Quality Management District v... of Appeals for the District of Columbia Circuit. South Coast Air Quality Management District v....

  13. Quality-assurance and data management plan for groundwater activities by the U.S. Geological Survey in Kansas, 2014

    USGS Publications Warehouse

    Putnam, James E.; Hansen, Cristi V.

    2014-01-01

    As the Nation’s principle earth-science information agency, the U.S. Geological Survey (USGS) is depended on to collect data of the highest quality. This document is a quality-assurance plan for groundwater activities (GWQAP) of the Kansas Water Science Center. The purpose of this GWQAP is to establish a minimum set of guidelines and practices to be used by the Kansas Water Science Center to ensure quality in groundwater activities. Included within these practices are the assignment of responsibilities for implementing quality-assurance activities in the Kansas Water Science Center and establishment of review procedures needed to ensure the technical quality and reliability of the groundwater products. In addition, this GWQAP is intended to complement quality-assurance plans for surface-water and water-quality activities and similar plans for the Kansas Water Science Center and general project activities throughout the USGS. This document provides the framework for collecting, analyzing, and reporting groundwater data that are quality assured and quality controlled. This GWQAP presents policies directing the collection, processing, analysis, storage, review, and publication of groundwater data. In addition, policies related to organizational responsibilities, training, project planning, and safety are presented. These policies and practices pertain to all groundwater activities conducted by the Kansas Water Science Center, including data-collection programs, interpretive and research projects. This report also includes the data management plan that describes the progression of data management from data collection to archiving and publication.

  14. Assessment of a Megacity Air Quality Management Policy using the GAINS-Korea : Seoul metropolitan area Air Quality Management Plan(SAQMP)

    NASA Astrophysics Data System (ADS)

    Kim, Y.; Woo, J. H.; Ahn, Y. H.; Choi, K. C.; Kim, H. K.; Lee, Y. M.; Amann, M.; Wagner, F.; Lee, J. B.; Song, C. K.; Han, J. S.

    2014-12-01

    Air pollution in and near megacities are very severe because of their massive pollutant emissions and high population density. Korea has ambitiously set its 2nd phase capitol air quality improvement program called Seoul metropolitan area Air Quality Management Plan(SAQMP), targeting the year 2024. The air quality improvement targets for the year 2024 are 30 ug/m3 and 20 ug/m3 for PM10 and pm2.5, respectively and planned expenditure are almost 4 billion US dollar. Emissions of PM10, PM2.5 are required to be decreased up to 35%, 45%, respectively, from their future baseline level. Various special measures, such as cap-and-trade, LNB, EURO standards program, will be implemented to control emissions over Seoul, Incheon, and Gyeonggi-do area. Smart approach of reducing air pollution and GHGs are, however, required to maximize improvement of metropolitan air quality and climate change. IIASA's Greenhouse gas - Air pollution Interactions aNd Synergies(GAINS) modeling framework is an widely used tool to design and manage smart emission control strategies that can achieve air quality/climate improvements with least costs. We have developed the national version of GAINS for Korea (GAINS-Korea) to set up those strategies for national and regional scale. In this study, we have implemented SAQMP in the GAINS-Korea Model and assess its effects of emissions reduction and air quality improvements. Various analysis results using the framework will be presented at site.

  15. 78 FR 45114 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... proposing to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) portion of... Rule 431.1 was actually for the South Coast Air Quality Management District (SCAQMD). The Antelope... Antelope Valley amended or rescinded the rule. On January 1, 2002, Antelope Valley Air Quality...

  16. Groundwater quality assessment plan for the Metallurgical Laboratory Hazardous Waste Management Facility

    SciTech Connect

    Jerome, K.M.

    1990-10-01

    The Metallurgical Laboratory Hazardous Waste Management Facility (MLHWMF) will be closed under interim status regulation and permitted as a hazardous waste management facility by a Post Closure Part B Permit under 40 CFR 264. This report discusses the ground water quality assessment plan for the MLHWMF. The Metallurgical Laboratory Hazardous Waste Management Facility consists of the process sewer line leading to the Metallurgical Laboratory basin from the fence, the Metallurgical Laboratory basin, the drainage outfall to the Carolina bay, and the Carolina bay itself. The Metallurgical Laboratory HWMF received F001, F003, F007, and D011 waste. F001 waste includes spent halogenated solvents used in degreasing (trichloroethylene, 1,1,1-trichloroethane, and carbon tetrachloride). F003 waste includes spent nonhalogenated solvents (acetone), and F007 waste is spent cyanide plating bath solution. At present forty-three constituents are analyzed per sample. Trichloroethylene, tetrachloroethylene, and total radium are the only constituents that were reported above Primary Drinking Water Standards (PDWS) during the second quarter of 1990. Listed in this report are the constituents that are being analyzed at present. Appendix A presents the trends for the analyzed constituents from the fourth quarter of 1988 to the second quarter of 1990. 5 figs., 5 tabs.

  17. Multi-Pollutant Planning and Control Strategies for Air Quality Management

    EPA Pesticide Factsheets

    Describes how planning controls for multiple pollutants at the same time can save money and time and achieve significant benefits, and how control strategies can address both climate change and air quality.

  18. Quality assurance project plan for ground water monitoring activities managed by Westinghouse Hanford Company. Revision 3

    SciTech Connect

    Stauffer, M.

    1995-11-01

    This quality assurance project plan (QAPP) applies specifically to the field activities and laboratory analysis performed for all RCRA groundwater projects conducted by Hanford Technical Services. This QAPP is generic in approach and shall be implemented in conjunction with the specific requirements of individual groundwater monitoring plans.

  19. Air Quality Implementation Plans

    EPA Pesticide Factsheets

    States must develop plans to attain and maintain air quality standards. These plans, known as SIPs, are submitted to EPA for approval. This web site contains information about this process and the current status of the submittals.

  20. NATIONAL EXPOSURE RESEARCH LABORATORY (NERL) INTEGRATED INFORMATOIN AND QUALITY MANAGEMENT PLAN TRAINING

    EPA Science Inventory

    The success of the NERL quality system relies on participation by all managers and staff. This training was developed for the purpose of communicating the basic features of the quality system in a convenient and efficient manner. The total time to complete a review of all five ...

  1. 77 FR 37359 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ... Management District; San Joaquin Valley Unified Air Pollution Control District AGENCY: Environmental... Coast Air Quality Management District (SCAQMD) and the San Joaquin Valley Unified Air Pollution Control... regulations that control VOC emissions. The purpose of SCAQMD Rule 1133.1 is to prevent...

  2. 77 FR 2496 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the...

  3. DMPTool: New Guidance, Resources, and Outreach for Quality Data Management Plans

    NASA Astrophysics Data System (ADS)

    Cruse, P.; Sallans, A.

    2013-12-01

    A growing number of US federal funding agencies require data management plans (DMP) as part of new research grant proposals. To help researchers with this requirement, several organizations (the California Digital Library, University of Illinois, University of Virginia, Smithsonian Institution, the DataONE consortium and the (UK) Digital Curation Centre) came together to develop the DMPTool in 2011. The goal of the DMPTool is to provide researchers with guidance, links to resources and help with writing data management plans. Thanks to a grant from the Alfred P. Sloan Foundation, these organizations have been able to develop DMPTool2, adding new features and functionality, while aiming to grow the number of users and funding requirements and build a community around DMP best practices. Researchers create plans in the tool by selecting their desired funding agency. The tool provides specific requirements from the selected agency as well as detailed help with each area of the plan. Users have access to complete DMP life cycle management, tracking changes through creation, editing, submission, evaluation, and publication. They may also perform enhanced keyword searches and view publicly available plans. With role-based user authorization, users may hold various roles within the interface: creators, collaborators, institutional administrators, and tool administrators. Furthermore, partner institutions can add significant value to the process with several special tool features. Along with institutional branding in the interface, they can provide links to resources they provide to users, such as to preservation repositories, consultation services, or news and event items. In addition, partner institutions can provide help with specific plan questions, and even suggest responses. Institutional administrators can also mine data on plans in order to better support researchers. Institutions may be represented in different roles: as a funder, a researcher's affiliate, or as

  4. Specific application for Oak Ridge National Laboratory dismantlement of Building 3004. Appendix A -- Quality assurance plan; Appendix B -- Records management plan

    SciTech Connect

    1997-03-01

    This quality assurance (QA) plan defines the QA requirements for the dismantlement and removal of Building 3004 at Oak Ridge National Laboratory (ORNL). The building is a four-story wooden trained structure with wooden siding, which resides approximately 150 ft west of the Bulk Shielding Reactor, and only several feet away from the visitors entrance to the Graphite Reactor museum. Complete descriptions and sketches are in the Performance Specification document for this project. This project is being conducted as a non-CERCLA maintenance action. This plan is an appendix to the QA plan for the ORNL Environmental Restoration (ER) Program. ORNL/ER-225, which is the source of the project QA requirements, tailors those QA requirements to the specific needs of this project as defined in ORNL/ER-225. Project-specific description and organization are also provided in this plan. Appendix B, Records Management Plan, is included.

  5. Environmental Technology Verification Program Quality Management Plan, Version 3.0

    EPA Science Inventory

    The ETV QMP is a document that addresses specific policies and procedures that have been established for managing quality-related activities in the ETV program. It is the “blueprint” that defines an organization’s QA policies and procedures; the criteria for and areas of QA appli...

  6. Energy Management Plan.

    ERIC Educational Resources Information Center

    Tasmania Dept. of Education, Hobart (Australia). Facilities Services Section.

    This report presents an overview of the energy management plan for Tasmanian schools designed to minimize the costs of all forms of energy usage within these facilities. The policy and objectives of the plan are provided along with details of the plan itself and its current status. Appendices contain an extract from Asset Management Plan for Real…

  7. Safety and quality management and administration Fiscal Year 1995 site support program plan WBS 6.7.2.6

    SciTech Connect

    Hagan, J.W.

    1994-09-01

    The mission of the Emergency, Safety, and Quality Services (ESQ) management and Program Integration is to provide leadership for the ESQ Department, coordinate business management activities of the ESQ department, and the programs it supports, as well as to plan organize, direct, and control other activities that require department-wide coordination. Primary activities include providing strategic and business planning and reporting support to ESQ management; developing and documenting ESQ management systems and procedures; coordinating ESQ`s self-assessment and Award Fee self evaluation efforts; coordinating the ESQ departments`s communication, total quality, cost savings, and productivity efforts; and tracking ESQ commitments and staffing data. This program element also provides program direction and performance assessment for the ESH&Q division of ICF KH. The ESH&Q Division educates ICF KH management and employees to protect personnel and the environment; identifies, interprets and inspects to requirements; provides administrative and field support; performs final acceptance of construction; assesses effectiveness of ICF KH programs and processes, and performs baseline ESH&Q assessments.

  8. Energy planning and management plan

    SciTech Connect

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

  9. Business Continuity Management Plan

    DTIC Science & Technology

    2014-12-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT BUSINESS CONTINUITY MANAGEMENT PLAN December 2014...Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget...

  10. Design of Cycle 3 of the National Water-Quality Assessment Program, 2013-23: Part 2: Science plan for improved water-quality information and management

    USGS Publications Warehouse

    Rowe, Gary L.; Belitz, Kenneth; Demas, Charlie R.; Essaid, Hedeff I.; Gilliom, Robert J.; Hamilton, Pixie A.; Hoos, Anne B.; Lee, Casey J.; Munn, Mark D.; Wolock, David W.

    2013-01-01

    This report presents a science strategy for the third decade of the National Water-Quality Assessment (NAWQA) Program, which since 1991, has been responsible for providing nationally consistent information on the quality of the Nation's streams and groundwater; how water quality is changing over time; and the major natural and human factors that affect current water quality conditions and trends. The strategy is based on an extensive evaluation of the accomplishments of NAWQA over its first two decades, the current status of water-quality monitoring activities by USGS and its partners, and an updated analysis of stakeholder priorities. The plan is designed to address priority issues and national needs identified by NAWQA stakeholders and the National Research Council (2012) irrespective of budget constraints. This plan describes four major goals for the third decade (Cycle 3), the approaches for monitoring, modeling, and scientific studies, key partnerships required to achieve these goals, and products and outcomes that will result from planned assessment activities. The science plan for 2013–2023 is a comprehensive approach to meet stakeholder priorities for: (1) rebuilding NAWQA monitoring networks for streams, rivers, and groundwater, and (2) upgrading models used to extrapolate and forecast changes in water-quality and stream ecosystem condition in response to changing climate and land use. The Cycle 3 plan continues approaches that have been central to the Program’s long-term success, but adjusts monitoring intensities and study designs to address critical information needs and identified data gaps. Restoration of diminished monitoring networks and new directions in modeling and interpretative studies address growing and evolving public and stakeholder needs for water-quality information and improved management, particularly in the face of increasing challenges related to population growth, increasing demands for water, and changing land use and climate

  11. Groundwater Quality Assessment Plan for Single-Shell Tank Waste Management Area U

    SciTech Connect

    Smith, Ronald M.; Hodges, Floyd N.; Williams, Barbara A.

    2001-08-29

    Single-Shell Tank Waste Management Area U (WMA U) is in the 200 West Area on the Hanford Site. The area includes the U Tank Farm that contains 16 underground, single-shell tanks and their ancillary equipment and waste systems. WMA U is regulated under the Resource Conservation and Recovery Act of 1976 (RCRA) as codified in 40 CFR Part 265, Subpart F and Washington's Hazardous Waste Management Act (HWMA, RCW 70.105) and its implementing requirements in the Washington State dangerous waste regulations (WAC 173-303-400). Releases of hazardous wastes from WMA U have contaminated groundwater beneath the area. Therefore, the WMA U is being assessed to determine the rate of movement and extent of the contamination released and to determine the concentrations in groundwater. The original finding of groundwater impact was determined from elevated specific conductance in downgradient well 299-W19-41. The elevated specific conductance was attributed to the nonhazardous constituents calcium, magnesium, sulfate, and chloride. Tank waste constituents nitrate and technetium-99 are also present as co-contaminants and have increased over the past several years; however, at concentrations well below the respective drinking water standards. Chromium concentrations in downgradient wells have generally exceeded background levels, but similar levels were also observed in upgradient well 299-W18-25 in early 2000 before it went dry. The objective of this report is to present the current conceptual model for how and where contaminant releases have reached the water table and how that contamination has dispersed in the groundwater system. These efforts will achieve the requirements of a groundwater quality assessment under RCRA [40 CFR 265.93 (d)(4)]. On that basis, a monitoring schedule with appropriate analytes and proposals for new wells and tests are presented in this document.

  12. KCBX Quality Assurance Project Plan - October 2014

    EPA Pesticide Factsheets

    This revised plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring by URS Corporation at the KCBX Terminals Company North and South Terminals in Chicago, Ill.

  13. KCBX Quality Assurance Project Plan - February 2014

    EPA Pesticide Factsheets

    This plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring, by URS Corporation, at the KCBX Terminals Company North and South Terminals in Chicago, IL.

  14. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    SciTech Connect

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs.

  15. Natural Resource Management Plan

    SciTech Connect

    Green, T.; Schwager, K.

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  16. 30 CFR 28.31 - Quality control plans; contents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Quality control plans; contents. 28.31 Section... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.31 Quality control plans; contents. (a) Each quality control plan shall contain provisions for the management of quality, including:...

  17. 30 CFR 28.31 - Quality control plans; contents.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Quality control plans; contents. 28.31 Section... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.31 Quality control plans; contents. (a) Each quality control plan shall contain provisions for the management of quality, including:...

  18. 30 CFR 28.31 - Quality control plans; contents.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Quality control plans; contents. 28.31 Section... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.31 Quality control plans; contents. (a) Each quality control plan shall contain provisions for the management of quality, including:...

  19. 30 CFR 28.31 - Quality control plans; contents.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Quality control plans; contents. 28.31 Section... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.31 Quality control plans; contents. (a) Each quality control plan shall contain provisions for the management of quality, including:...

  20. 30 CFR 28.31 - Quality control plans; contents.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Quality control plans; contents. 28.31 Section... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.31 Quality control plans; contents. (a) Each quality control plan shall contain provisions for the management of quality, including:...

  1. Population management, systems-based practice, and planned chronic illness care: integrating disease management competencies into primary care to improve composite diabetes quality measures.

    PubMed

    Kimura, Joe; DaSilva, Karen; Marshall, Richard

    2008-02-01

    The increasing prevalence of chronic illnesses in the United States requires a fundamental redesign of the primary care delivery system's structure and processes in order to meet the changing needs and expectations of patients. Population management, systems-based practice, and planned chronic illness care are 3 potential processes that can be integrated into primary care and are compatible with the Chronic Care Model. In 2003, Harvard Vanguard Medical Associates, a multispecialty ambulatory physician group practice based in Boston, Massachusetts, began implementing all 3 processes across its primary care practices. From 2004 to 2006, the overall diabetes composite quality measures improved from 51% to 58% for screening (HgA1c x 2, low-density lipoprotein, blood pressure in 12 months) and from 13% to 17% for intermediate outcomes (HgA1c planned visits compared to those who had no planned visits. This study illustrates how 1 delivery system integrated these disease management functions into the front lines of primary care and the positive impact of those changes on overall diabetes quality of care.

  2. Risk Management Plan Rule

    EPA Pesticide Factsheets

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  3. Long-term integrated river basin planning and management of water quantity and water quality in mining impacted catchments

    NASA Astrophysics Data System (ADS)

    Pohle, Ina; Zimmermann, Kai; Claus, Thomas; Koch, Hagen; Gädeke, Anne; Uhlmann, Wilfried; Kaltofen, Michael; Müller, Fabian; Redetzky, Michael; Schramm, Martina; Schoenheinz, Dagmar; Grünewald, Uwe

    2015-04-01

    During the last decades, socioeconomic change in the catchment of the Spree River, a tributary of the Elbe, has been to a large extent associated with lignite mining activities and the rapid decrease of these activities in the 1990s. There are multiple interconnections between lignite mining and water management both in terms of water quantity and quality. During the active mining period a large-scale groundwater depression cone has been formed while river discharges have been artificially increased. Now, the decommissioned opencast mines are being transformed into Europe's largest man-made lake district. However, acid mine drainage causes low pH in post mining lakes and high concentrations of iron and sulphate in post mining lakes and the river system. Next to potential changes in mining activities, also the potential impacts of climate change (increasing temperature and decreasing precipitation) on water resources of the region are of major interest. The fundamental question is to what extent problems in terms of water quantity and water quality are exacerbated and whether they can be mitigated by adaptation measures. In consequence, long term water resource planning in the region has to formulate adaptation measures to climate change and socioeconomic change in terms of mining activities which consider both, water quantity and water quality aspects. To assess potential impacts of climate and socioeconomic change on water quantity and water quality of the Spree River catchment up to the Spremberg reservoir in the scenario period up to 2052, we used a model chain which consists of (i) the regional climate model STAR (scenarios with a further increase in temperature of 0 and 2 K), (ii) mining scenarios (mining discharges, cooling water consumption of thermal power plants), (iii) the ecohydrological model SWIM (natural water balance), (iv) the long term water management model WBalMo (managed discharges, withdrawal of water users, reservoir operation) and (v) the

  4. TQM (Total Quality Management) SPARC (Special Process Action Review Committees) Handbook

    DTIC Science & Technology

    1989-08-01

    improvement; Logistics information; Process analysis ; Quality control; Quality assurance; Total Quality Management; Statistical processes; Management Planning and control; Management training; Management information systems.

  5. Integrated surgical emergency training plan in the internship: A step toward improving the quality of training and emergency center management

    PubMed Central

    Akhlaghi, Mohammad Reza; Vafamehr, Vajiheh; Dadgostarnia, Mohammad; Dehghani, Alireza

    2013-01-01

    training of emergency issues, increasing the teamwork, facing a variety of patients, practicing the role of general practitioners, role-playing on a real patient's bedside, having a multilateral approach to the patient, reducing the wasting time on minor wards, balancing the work and rest schedules of the interns, and better learning and satisfaction of the interns. Over 60% of the participants believed the program has the following benefits: More attention on the training plan, improving the learning of patient management, being more responsive for the training of interns, increasing operational approach to emergency patients, being more aware of the performed actions, and increasing the quality and speed of services provided to patients. The mean score assigned to the whole questionnaire of investigating the viewpoints was 37.5 out of 50. The mean score of the interns’ questionnaire was significantly more than the mean score of the assistants. Discussion: The results obtained indicated that the greatest existing consensus about this plan was the positive impact on the learning of interns in the emergency setting. Thus, it will not only increase the number of patients who the interns are managing during the internship course, but also increases the balance of their workload and they can learn and manage the emergency patients with more leisure. PMID:24520557

  6. Performance Management Plan

    SciTech Connect

    IT Corporation, Las Vegas, NV

    2002-08-21

    This Performance Management Plan describes the approach for accelerating cleanup activities of U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) Environmental Management (EM) Program. This approach accelerates the reduction of risk at NNSA/NV sites while performing the work responsibly, effectively, and more efficiently. In May 2002, NNSA/NV EM and the Nevada Division of Environmental Protection signed a Letter of Intent formalizing an agreement to pursue accelerated risk reduction and cleanup for activities within the State of Nevada. This Performance Management Plan provides the strategic direction for implementing the Letter of Intent.

  7. [Quality of life, work management, and career planning as a primary care technology in the Unified National Health System in São Paulo State, Brazil].

    PubMed

    Lacaz, Francisco Antonio de Castro; Vieira, Nelson Passagem; Cortizo, Carlos Tato; Junqueira, Virgínia; dos Santos, Ana Paula Lopes; Santos, Fabio Souza

    2010-02-01

    This article discusses the concept of quality of life in and at work, linked to health work management based on the evaluation of a work management instrument: the Career, Job, and Wage Plan. The aim was to analyze the plan as a work management technology in primary care in the Unified National Health System (SUS). The article discusses the plan in three municipalities in São Paulo State, Brazil: São Paulo, Guarulhos, and Campinas, in compliance with guidelines issued by the National Health Council in 2006, and using a qualitative survey conducted in 2007-2008. The study presents the findings from research in eight municipalities, based on interviews with managers, users (represented by Health Councils), and health workers and health sector trade unionists. The article concludes that this is still an incipient public management policy issue, with limited command by users, trade unionists, and health workers in the target municipalities, heavily populated 'hub cities' in the health regions.

  8. Managing Quality: TQM in Libraries.

    ERIC Educational Resources Information Center

    Riggs, Donald E.

    1993-01-01

    Discusses the use of total quality management (TQM) principles in libraries. Topics addressed include commitment from the library director; strategic planning; training needs for library staff; the identification and selection of targeted areas that would benefit from TQM; quality improvement teams; analysis; proposed solutions; and evaluation…

  9. Systems engineering management plans.

    SciTech Connect

    Rodriguez, Tamara S.

    2009-10-01

    The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

  10. 78 FR 10589 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District; Stationary Source Permits AGENCY: Environmental Protection Agency... by California as a revision to the Sacramento Metropolitan Air Quality Management District (SMAQMD...

  11. Environmental Restoration Quality Program Plan

    SciTech Connect

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a entral Environmental Restoration Division'' to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization's objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  12. Planning and Implementing total Quality Management in an Air Force Service Organization: A Case Study

    DTIC Science & Technology

    1988-09-01

    48 IV. Conclusions and Recommendations ...... 52 Lessons Learned ..... .............. 52 Practical Implications ........... 55 Recommendations...traditional quality control methods practically useless in a service-oriented environment (8:9-10). Common threads among the literature indicate these...disseminating known and tried practices , techniques and tools (1:9). Scope This case concerns a single service organization, AFALC, as the unit of

  13. PLANNING QUALITY IN GEOSPATIAL PROJECTS

    EPA Science Inventory

    This presentation will briefly review some legal drivers and present a structure for the writing of geospatial Quality Assurance Projects Plans. In addition, the Geospatial Quality Council geospatial information life-cycle and sources of error flowchart will be reviewed.

  14. Management self assessment plan

    SciTech Connect

    Debban, B.L.

    1998-01-30

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.

  15. SWiFT Software Quality Assurance Plan.

    SciTech Connect

    Berg, Jonathan Charles

    2016-01-01

    This document describes the software development practice areas and processes which contribute to the ability of SWiFT software developers to provide quality software. These processes are designed to satisfy the requirements set forth by the Sandia Software Quality Assurance Program (SSQAP). APPROVALS SWiFT Software Quality Assurance Plan (SAND2016-0765) approved by: Department Manager SWiFT Site Lead Dave Minster (6121) Date Jonathan White (6121) Date SWiFT Controls Engineer Jonathan Berg (6121) Date CHANGE HISTORY Issue Date Originator(s) Description A 2016/01/27 Jon Berg (06121) Initial release of the SWiFT Software Quality Assurance Plan

  16. Quality assurance program plan for Building 327

    SciTech Connect

    Tanke, J.M.

    1997-05-22

    This Quality Assurance Program Plan (QAPP) provides an overview of the quality assurance program for Building 327. The program applies to the facility safety structures, systems, and components and to activities that could affect safety structures, systems, and components. Adherence to the quality assurance program ensures the following: US Department of Energy missions and objectives are effectively accomplished; Products and services are safe, reliable, and meet or exceed the requirements and expectations of the user; Hazards to the public, to Hanford Site and facility workers, and to the environment are minimized. The format of this Quality Assurance Program Plan is structured to parallel that of 10 CFR 83 0.120, Quality Assurance Requirements. This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the 324 Building B-Cell Safety Cleanout Project (BCCP). This QAPP is responsive to the Westinghouse Hanford Company Quality Assurance Program and Implementation Plan, WHC-SP 113 1, for 10 CFR 830.120, Nuclear Safety Management, Quality Assurance Requirements; and DOE Order 5700.6C, Quality Assurance. This QAPP supersedes PNNL PNL-MA-70 QAP Quality Assurance Plan No. WTC-050 Rev. 2, issue date May 3, 1996.

  17. Soil quality is key for planning and managing urban allotments intended for the sustainable production of home-consumption vegetables.

    PubMed

    Bretzel, F; Calderisi, M; Scatena, M; Pini, R

    2016-09-01

    The growing importance of urban allotments in planning and managing urban areas is due to the combined positive effects on ecosystem services, the economy and human well-being, especially of groups of the urban population that can be vulnerable (e.g. the elderly, immigrants, low-income families). Some studies have highlighted the potential risk of contamination by metals of vegetables grown in urban areas and the lack of appropriate site-specific risk assessments. However, surveys are still lacking on the possibilities of using urban soil as a good substrate to produce vegetables for home consumption. We assessed the soil quality in two areas in Pisa (Italy), one intended for urban horticulture and the other already cultivated for that purpose. We analysed the soils for the main chemical and physical characteristics (texture, bulk density, water stability index, pH, cation exchange capacity, organic carbon, total nitrogen, phosphorous) and elements (Pb, Cu, Ni, Cr, Zn, Cd, As, K, Al and Mn). Our results showed that both areas had physical and chemical heterogeneity due to the effects of urbanization and to the different cultivation techniques employed. The metal content was lower than the guidelines limits, and the soil conditions (pH = 8) greatly reduced the metal mobility. Copper concentration in some of the cultivated area samples was higher than the limits, representing a possible stress factor for the microbial biodiversity and fauna. Our findings demonstrate that site-specific surveys are necessary before planning urban cultivation areas, and educating urban gardeners regarding sustainable cultivation techniques is a priority for a safe environment.

  18. Building Air Quality. Action Plan.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Indoor Air Div.

    Building managers and owners often confront competing demands to reduce operating costs and increase revenues that can siphon funds and resources from other building management concerns such as indoor air quality (IAQ). This resource booklet, designed for use with the "Building Air Quality Guide," provides building owners and managers with an…

  19. Plutonium Vulnerability Management Plan

    SciTech Connect

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  20. 75 FR 40762 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental... Sacramento Metropolitan Air Quality Management District (SMAQMD) and South Coast Air Quality...

  1. Biohazardous waste management plan.

    SciTech Connect

    Lane, Todd W.

    2004-01-01

    This plan describes the process for managing non-medical biohazardous waste at Sandia National Laboratories California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of biohazardous waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to non-medical biohazardous waste.

  2. Medical waste management plan.

    SciTech Connect

    Lane, Todd W.; VanderNoot, Victoria A.

    2004-12-01

    This plan describes the process for managing research generated medical waste at Sandia National Laboratories/California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of medical waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to medical waste.

  3. Strategic Planning and Financial Management

    ERIC Educational Resources Information Center

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  4. Quality assurance plan for the data acquisition and management system for monitoring the fuel oil spill at the Sandia National Laboratories installation in Livermore, California

    SciTech Connect

    Peerenboom, J.P.; Leser, C.C.; Ramsey, G.M.; Widing, M.A.

    1995-04-01

    In February 1975, the accidental puncture of an underground transfer line buried about 4 ft below the ground surface at the SNL installation in Livermore, California, resulted in the release of approximately 225.5 m{sup 3} of No. 2 diesel fuel. This report describes the formal quality assurance plan that will be used for the data acquisition and management system developed to monitor a bioremediation pilot study by Argonne National Laboratory in association with Sandia National Laboratories. The data acquisition and management system will record the site data during the bioremediation effort and assist users in site analysis. The designs of the three major subsystems of this system are described in this report. Quality assurance criteria are defined for the management, performance, and assessment of the system. Finally, the roles and responsibilities for configuration management of this system are defined for the entire life cycle of the project.

  5. Managing the Quality of Environmental Data in EPA Region 9

    EPA Pesticide Factsheets

    EPA Pacific Southwest, Region 9's Quality Assurance (QA) section's primary mission is to effectively oversee and carry out the Quality System and Quality Management Plan, and project-level quality assurance and quality control (QA/QC) activities.

  6. 78 FR 53270 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District; Stationary Source Permits AGENCY: Environmental Protection Agency... permitting rules submitted by California as a revision to the Sacramento Metropolitan Air Quality...

  7. EPA Guidance for Geospatially Related Quality Assurance Project Plans

    EPA Pesticide Factsheets

    This March 2003 document discusses EPA's Quality Assurance (QA) Project Plan as a tool for project managers and planners to document the type and quality of data and information needed for making environmental decisions

  8. Total Quality Management (TQM). Implementers Workshop

    DTIC Science & Technology

    1990-05-15

    approaches and methods for planning, organizing, and launching TOM within OSD functions. 1-3 . .. TOTAL QUALITY I Ii N MANAGEMENT Implementers Workshop...TOM Review COMMON THEMES OF TQM EXPERTS - Customer defines quality . - Quality becomes prevention-based. - Team approach to problem-solving...different in approaches , all advocate the quality path to productivity. 2-5 a gg. Z - TOTAL QUALITY J LI VI MANAGEMENT Implementers Workshop TQM Review

  9. Total Quality Management Simplified.

    ERIC Educational Resources Information Center

    Arias, Pam

    1995-01-01

    Maintains that Total Quality Management (TQM) is one method that helps to monitor and improve the quality of child care. Lists four steps for a child-care center to design and implement its own TQM program. Suggests that quality assurance in child-care settings is an ongoing process, and that TQM programs help in providing consistent, high-quality…

  10. Environmental Management System Plan

    SciTech Connect

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These

  11. Strategic Planning and Quality Assurance in the Bologna Process

    ERIC Educational Resources Information Center

    Kettunen, Juha; Kantola, Mauri

    2007-01-01

    Strategic planning and quality management have been developed independently of each other, but they meet in practice in many kinds of organisations. Strategic planning and quality assurance integrate different aspects of higher education institutions (HEIs) to ensure high-quality educational outcomes. This paper investigates the role of these two…

  12. Quality management in orthodontics.

    PubMed

    Prahl-Andersen, Birte

    2005-11-01

    The introduction of modern quality thinking to orthodontic care should be a continuing effort on the part of the orthodontic profession. The strategy for the development of a European quality management system in orthodontic care was developed from 1993 to 2000 during the EURO-QUAL project. During the project's first stage, the basic prerequisites were identified for a general model of quality management in orthodontic care. A supra-national agreement was reached on policy statements for orthodontic care in Europe. The essential components of an orthodontic quality management system are: linking orthodontic care to population need, patient partnership, clinical accountability, and containing costs.Value-based health care and "TQM", the philosophy of total quality management, are basic principles applied in accordance with the recommendations of the European Health Committee of September 1997 and the "Health-for-All" policy framework of the World Health Organization.

  13. Groundwater quality assessment plan for single-shell waste management area B-BX-BY at the Hanford Site

    SciTech Connect

    SM Narbutovskih

    2000-03-31

    Pacific Northwest National Laboratory conducted a first determination groundwater quality assessment at the Hanford Site. This work was performed for the US Department of Energy, Richland Operations Office, in accordance with the Federal Facility Compliance Agreement during the time period 1996--1998. The purpose of the assessment was to determine if waste from the Single-Shell Tank (SST) Waste Management Area (WMA) B-BX-BY had entered the groundwater at levels above the drinking water standards (DWS). The resulting assessment report documented evidence demonstrating that waste from the WMA has, most likely, impacted groundwater quality. Based on 40 CFR 265.93 [d] paragraph (7), the owner-operator must continue to make the minimum required determinations of contaminant level and of rate/extent of migrations on a quarterly basis until final facility closure. These continued determinations are required because the groundwater quality assessment was implemented prior to final closure of the facility.

  14. Transforming air quality management

    SciTech Connect

    Janet McCabe

    2005-04-01

    Earlier this year, the Clean Air Act Advisory Committee submitted to EPA 38 recommendations intended to improve air quality management in the United States. This article summarizes the evaluation process leading up to the Committee's recommendations. 3 refs., 2 figs.

  15. Water resource management planning guide for Savannah River Plant

    SciTech Connect

    Hubbard, J.E.; Stephenson, D.E.; Steele, J.L. and Co., Aiken, SC . Savannah River Lab.); Gordon, D.E. and Co., Aiken, SC . Savannah River Plant)

    1988-10-01

    The Water Resource Management Planning Guide provides an outline for the development of a Savannah River Plant Water Resource Management Plan (WRMP) to protect, manage, and monitor the site's water resources. The management plan is based on three principle elements: (1) protection of the water quality, (2) management of the water quantity, and (3) monitoring of the water quality and quantity. The plan will assure that changes in water quality and quantity are identified and that corrective action is implemented as needed. In addition, water management activities within and between Savannah River Plant (SRP) organizations and departments will be coordinated to ensure the proper management of water resources. This document is intended as a guide to suggest goals and objectives that will provide a basis for the development of a water resource plan for SRP. Planning should be flexible rather than rigid, and the plan outlines in this document was prepared to be modified or updated as conditions necessitate. 16 refs., 12 figs.

  16. Technical and Non-Technical Measures for air pollution emission reduction: The integrated assessment of the regional Air Quality Management Plans through the Italian national model

    NASA Astrophysics Data System (ADS)

    D'Elia, I.; Bencardino, M.; Ciancarella, L.; Contaldi, M.; Vialetto, G.

    2009-12-01

    The Italian Air Quality legislation underwent sweeping changes with the implementation of the 1996 European Air Quality Framework Directive when the Italian administrative Regions were entrusted with air quality management tasks. The most recent Regional Air Quality Management Plans (AQMPs) highlighted the importance of Non-Technical Measures (NTMs), in addition to Technical Measures (TMs), in meeting environmental targets. The aim of the present work is to compile a list of all the TMs and NTMs taken into account in the Italian Regional AQMPs and to give in the target year, 2010, an estimation of SO 2, NO x and PM 10 emission reductions, of PM 10 concentration and of the health impact of PM 2.5 concentrations in terms of Life Expectancy Reduction. In order to do that, RAINS-Italy, as part of the National Integrated Modeling system for International Negotiation on atmospheric pollution (MINNI), has been applied. The management of TMs and NTMs inside RAINS have often obliged both the introduction of exogenous driving force scenarios and the control strategy modification. This has inspired a revision of the many NTM definitions and a clear choice of the definition adopted. It was finally highlighted that only few TMs and NTMs implemented in the AQMPs represent effective measures in reaching the environmental targets.

  17. Using Quality Improvement Methods to Implement an Electronic Medical Record (EMR) Supported Individualized Home Pain Management Plan for Children with Sickle Cell Disease

    PubMed Central

    Crosby, Lori E.; Simmons, Kenya; Kaiser, Peggy; Davis, Blair; Boyd, Patricia; Eichhorn, Tiffany; Mahaney, Tracy; Joffe, Naomi; Morgan, Darice; Schibler, Kathy; Anderson, Viia; Quinn, Charles T.; Kalinyak, Karen A.

    2014-01-01

    Objective Using quality improvement methodology, our goal was to develop and implement individualized home pain management plans (HPMP) that included pharmacologic as well as non-pharmacologic strategies for children with sickle cell disease (SCD). We hypothesized that successfully implemented HPMPs would have an impact on Emergency Department (ED) use, decreasing ED visits for uncomplicated SCD pain episodes. Methods A multidisciplinary quality improvement team developed a questionnaire to assess the frequency, location and severity of a patient’s pain during a routine, comprehensive visit in order to help the patient and family develop an effective pain management strategy using both pharmacologic and non-pharmacologic actions. Using plan do study act cycles (PDSAs), this team was able to build this process into the daily workflow for all SCD patients age 5 years to 21 years of age. Patients with comprehensive visits scheduled from January 2012 to May 2013 were included (N=188) in the intervention. Results By May of 2013, 88% of eligible patients had an individualized HPMP in place. There was a concomitant reduction in the percentage of SCD patients seen in the ED for uncomplicated SCD pain (6.9% vs. 1.1%). Conclusions Using quality improvement methods, an individualized HPMP intervention was incorporated successfully into the daily workflow of a busy outpatient SCD clinic. This intervention has the potential to improve patient outcomes by decreasing avoidable ED visits as well as reducing overall healthcare costs. PMID:25258504

  18. Multipollutant air quality management.

    PubMed

    Hidy, George M; Pennell, William T

    2010-06-01

    On the basis of a recent NARSTO assessment, this review discusses the factors involved in the implementation of a risk- and results-based multipollutant air quality management strategy applicable to North America. Such a strategy could evolve from current single-pollutant regulatory practices using a series of steps that would seek to minimize risk of exposure for humans and ecosystems while providing for a quantitative evaluation of the effectiveness of the management process. The tools needed to support multipollutant air quality management are summarized. They include application of a formal risk analysis, accounting for atmospheric processes, ambient measurements, emissions characterization, air quality modeling of emissions to ambient concentrations, and characterization of human and ecological responses to ambient pollutant exposure. The new management strategy would expand the current practice of accountability that relates emission reductions and attainment of air quality derived from air quality criteria and standards. Conceptually, achievement of accountability would establish goals optimizing risk reduction associated with pollution management. This expanded approach takes into account the sequence of processes from emissions reduction to resulting changes in ambient concentration. Using ambient concentration as a proxy for exposure, the resulting improvement in human and ecosystem health is estimated. The degree to which this chain of processes and effects can be achieved in current practice is examined in a multipollutant context exemplified by oxidants, as indicated by ozone, particulate matter, and some hazardous air pollutants. Achievement of a multipollutant management strategy will mostly depend on improving knowledge about human and ecosystem response to pollutant exposure.

  19. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    SciTech Connect

    Frazier, T.P.

    1994-10-20

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans.

  20. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... quality management plan. Such BMP's must reduce the amount of pollutants that enter a stream or lake by... 7 Agriculture 6 2012-01-01 2012-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water...

  1. NASA total quality management 1989 accomplishments report

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Described here are the accomplishments of NASA as a result of the use of Total Quality Management (TQM). The principles in practice which led to these process refinements are important cultural elements to any organization's productivity and quality efforts. The categories of TQM discussed here are top management leadership and support, strategic planning, focus on the customer, employee training and recognition, employee empowerment and teamwork, measurement and analysis, and quality assurance.

  2. Quality management under current conditions

    NASA Astrophysics Data System (ADS)

    Vasiliev, V. A.; Aleksandrova, S. V.

    2015-12-01

    The diversity of the concept of quality is defined. Modern quality management methods and tools are considered. The global components of quality management and quality management system ISO 9000 are discussed. Education requirements for specialists in the field of quality are formulated.

  3. Quality Management and Information Brokerage.

    ERIC Educational Resources Information Center

    van Halm, Johan

    1995-01-01

    To compete effectively, information brokers need to adopt management and marketing tools; Total Quality Management can upgrade an organization's performance by using customer feedback of its services. SERVQUAL identifies gaps in service by assessing quality expectations versus quality experiences. (AEF)

  4. Outcomes Oriented Planning, Management, and Evaluation.

    ERIC Educational Resources Information Center

    Kinnison, Charles J.

    An outcomes orientation is examined as the dominant focus for formulating improvements in a college's planning, management, and evaluation (PME) system. Outcomes are seen as individual (produced by college personnel or students), program related, or institutional. An outcomes orientation to PME has the advantages of relating to the quality of…

  5. Sandia software guidelines: Software quality planning

    SciTech Connect

    Not Available

    1987-08-01

    This volume is one in a series of Sandia Software Guidelines intended for use in producing quality software within Sandia National Laboratories. In consonance with the IEEE Standard for Software Quality Assurance Plans, this volume identifies procedures to follow in producing a Software Quality Assurance Plan for an organization or a project, and provides an example project SQA plan. 2 figs., 4 tabs.

  6. Total Quality Management Seminar.

    ERIC Educational Resources Information Center

    Massachusetts Career Development Inst., Springfield.

    This booklet is one of six texts from a workplace literacy curriculum designed to assist learners in facing the increased demands of the workplace. The booklet contains seven sections that cover the following topics: (1) meaning of total quality management (TQM); (2) the customer; (3) the organization's culture; (4) comparison of management…

  7. Near-facility environmental monitoring quality assurance project plan

    SciTech Connect

    McKinney, S.M.

    1997-11-24

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site.

  8. Total Quality Management Goes to Community College.

    ERIC Educational Resources Information Center

    DeCosmo, Richard D.; And Others

    1991-01-01

    This article details the four-year implementation of Total Quality Management at Delaware County Community College (Pennsylvania) to conserve resources, improve effectiveness, assure quality, and increase participation in decision making. Reported are planning, execution, and monitoring activities of the Implementation Team; specific problems…

  9. Hypothetical scenario exercises to improve planning and readiness for drinking water quality management during extreme weather events.

    PubMed

    Deere, Daniel; Leusch, Frederic D L; Humpage, Andrew; Cunliffe, David; Khan, Stuart J

    2017-03-15

    Two hypothetical scenario exercises were designed and conducted to reflect the increasingly extreme weather-related challenges faced by water utilities as the global climate changes. The first event was based on an extreme flood scenario. The second scenario involved a combination of weather events, including a wild forest fire ('bushfire') followed by runoff due to significant rainfall. For each scenario, a panel of diverse personnel from water utilities and relevant agencies (e.g. health departments) formed a hypothetical water utility and associated regulatory body to manage water quality following the simulated extreme weather event. A larger audience participated by asking questions and contributing key insights. Participants were confronted with unanticipated developments as the simulated scenarios unfolded, introduced by a facilitator. Participants were presented with information that may have challenged their conventional experiences regarding operational procedures in order to identify limitations in current procedures, assumptions, and readily available information. The process worked toward the identification of a list of specific key lessons for each event. At the conclusion of each simulation a facilitated discussion was used to establish key lessons of value to water utilities in preparing them for similar future extreme events.

  10. AVLIS production plant waste management plan

    SciTech Connect

    Not Available

    1984-11-15

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables.

  11. Environmental Restoration Quality Program Implementation Plan

    SciTech Connect

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  12. Quality Management of Biorepositories

    PubMed Central

    Gunter, Elaine W.; Sexton, Katherine C.; Bell, Walter C.

    2015-01-01

    Biomedical investigators require high quality human tissue to support their research; thus, an important aspect of the provision of tissues by biorepositories is the assurance of high quality and consistency of processing specimens. This is best accomplished by a quality management system (QMS). This article describes the basis of a QMS program designed to aid biorepositories that want to improve their operations. In 1983, the UAB Tissue Collection and Biobanking Facility (TCBF) introduced a QMS program focused on providing solid tissues to support a wide range of research; this QMS included a quality control examination of the specific specimens provided for research. Similarly, the Division of Laboratory Sciences at the Centers for Disease Control and Prevention (CDC) introduced a QMS program for their laboratory analyses, focused primarily on bodily fluids. The authors of this article bring together the experience of the QMS programs at these two sites to facilitate the development or improvement of quality management systems of a wide range of biorepositories. PMID:26035008

  13. Process chemistry {ampersand} statistics quality assurance plan

    SciTech Connect

    Meznarich, H.K.

    1996-08-01

    This document provides quality assurance guidelines and quality control requirements for Process Chemistry and Statistics. This document is designed on the basis of Hanford Analytical Services Quality Assurance Plan (HASQAP) technical guidelines and is used for governing process chemistry activities.

  14. Air quality risk management.

    PubMed

    Williams, Martin L

    2008-01-01

    Rather than attempt to provide a comprehensive account of air quality risk assessment, as might be found in a textbook or manual, this article discusses some issues that are of current importance in the United Kingdom and the rest of Europe, with special emphasis on risk assessment in the context of policy formulation, and emerging scientific knowledge. There are two pollutants of particular concern and that both pose challenges for risk assessment and policy, and they are particulate matter (PM) and ozone. The article describes some issues for health risk assessment and finally some forward-looking suggestions for future approaches to air quality management.

  15. Fact Sheet - Managing Ozone Air Quality: Findings on Failure to Submit Elements of 1997 Ozone NAAQS State Implementation Plan

    EPA Pesticide Factsheets

    This fact sheet provides a basic overview of the May 17, 2008 notice that 11 states missed their deadlines to submit their state implementation plans (SIPs). The deadlines are for submitting complete plans showing how they will meet the 1997 ozone standard

  16. Hanford site sodium management plan

    SciTech Connect

    Guttenberg, S.

    1995-09-25

    The Hanford Site Sodium Management Plan, Revision 1, provides changes to the major elements and management strategy to ensure an integrated and coordinated approach for disposition of the more than 350,000 gallons of sodium and related sodium facilities located at the DOE`s Hanford Site

  17. Quality Management Program

    SciTech Connect

    Not Available

    1991-10-01

    According to {section} 35.32, Quality Management Program,'' of 10 CFR Part 35, Medical Use of Byproduct Material,'' applicants or licensees, as applicable, are required to establish a quality management (QM) program. This regulatory guide provides guidance to licensees and applicants for developing policies and procedures for the QM program. This guide does not restrict or limit the licensee from using other guidance that may be equally useful in developing a QM program, e.g., information available from the Joint Commission on Accreditation of Healthcare Organizations or the American College of Radiology. Any information collection activities mentioned in this regulatory guide are contained as requirements in 10 CFR Part 35, which provides the regulatory basis for this guide. This information collection requirements in 10 CFR Part 35 have been cleared under OMB Clearance No. 3150-0010.

  18. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    SciTech Connect

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  19. Construction Management: Planning Ahead.

    ERIC Educational Resources Information Center

    Arsht, Steven

    2003-01-01

    Explains that preconstruction planning is essential when undertaking the challenges of a school building renovation or expansion, focusing on developing a detailed estimate, creating an effective construction strategy, conducting reviews and value-engineering workshops, and realizing savings through effective risk analysis and contingency…

  20. Minerals Management Service: Strategic plan

    SciTech Connect

    1997-09-30

    This plan addresses the management of the mineral resources on the Outer Continental Shelf in an environmentally sound and safe manner and the timely collection, verification, and distribution of mineral revenues from Federal and Indian lands. The Minerals Management Service (MMS) manages the Nation`s natural gas, oil and other mineral resources on the Outer Continental Shelf (OCS), and collects, accounts for, and disburses revenues from offshore federal mineral leases and from onshore mineral leases on Federal and Indian lands.

  1. Managing quality and compliance.

    PubMed

    McNeil, Alice; Koppel, Carl

    2015-01-01

    Critical care nurses assume vital roles in maintaining patient care quality. There are distinct facets to the process including standard setting, regulatory compliance, and completion of reports associated with these endeavors. Typically, multiple niche software applications are required and user interfaces are varied and complex. Although there are distinct quality indicators that must be tracked as well as a list of serious or sentinel events that must be documented and reported, nurses may not know the precise steps to ensure that information is properly documented and actually reaches the proper authorities for further investigation and follow-up actions. Technology advances have permitted the evolution of a singular software platform, capable of monitoring quality indicators and managing all facets of reporting associated with regulatory compliance.

  2. Underground storage tank management plan

    SciTech Connect

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  3. Air Quality Management Process Cycle

    EPA Pesticide Factsheets

    Air quality management are activities a regulatory authority undertakes to protect human health and the environment from the harmful effects of air pollution. The process of managing air quality can be illustrated as a cycle of inter-related elements.

  4. GSC configuration management plan

    NASA Technical Reports Server (NTRS)

    Withers, B. Edward

    1990-01-01

    The tools and methods used for the configuration management of the artifacts (including software and documentation) associated with the Guidance and Control Software (GCS) project are described. The GCS project is part of a software error studies research program. Three implementations of GCS are being produced in order to study the fundamental characteristics of the software failure process. The Code Management System (CMS) is used to track and retrieve versions of the documentation and software. Application of the CMS for this project is described and the numbering scheme is delineated for the versions of the project artifacts.

  5. Solid Waste Management Program Plan

    SciTech Connect

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  6. 42 CFR 423.153 - Drug utilization management, quality assurance, and medication therapy management programs (MTMPs).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 3 2012-10-01 2012-10-01 false Drug utilization management, quality assurance, and... Drug utilization management, quality assurance, and medication therapy management programs (MTMPs). (a... D plan, a drug utilization management program, quality assurance measures and systems, and an...

  7. 42 CFR 423.153 - Drug utilization management, quality assurance, and medication therapy management programs (MTMPs).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 3 2013-10-01 2013-10-01 false Drug utilization management, quality assurance, and... Drug utilization management, quality assurance, and medication therapy management programs (MTMPs). (a... D plan, a drug utilization management program, quality assurance measures and systems, and an...

  8. 42 CFR 423.153 - Drug utilization management, quality assurance, and medication therapy management programs (MTMPs).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 3 2014-10-01 2014-10-01 false Drug utilization management, quality assurance, and... Drug utilization management, quality assurance, and medication therapy management programs (MTMPs). (a... D plan, a drug utilization management program, quality assurance measures and systems, and an...

  9. A Model for Technovocational School-Based Curriculum Planning and Evaluation under the Framework of Total Quality Management.

    ERIC Educational Resources Information Center

    Wang, Yen-Zen

    In the current climate of rapid technological advance and social value change, many have suggested that schools should use a school-based approach to curriculum planning. How to design such a curriculum in order to train graduates suited for employment has become an important issue. Many domestic and international enterprises have successfully…

  10. A reservoir management plan

    SciTech Connect

    Allis, R.G.

    1989-06-16

    There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

  11. Integrated Facilities Management Plan.

    DTIC Science & Technology

    1984-04-30

    hgh -level software will be required. Any commercial data base management/spreadsheet package could be used. ’f course, as personnel use the system and...Avionics Laboratory tAAi and Iateri-a’ ) i, zat- tory (ML) personnel out bui lding rg dv 11 r % reass i gnment. t)20 Assign AA personnel from Building -7...in Buildings t, 11, 16, 20, 22, 46, 56, and 125 ind Bui dings SA, 12b, and 15t) would be completely vacated. The proposals tor IispositLon )f the

  12. Planning and Implementing Total Quality Management in the Royal Australian Air Force: A Multiple Case Study Analysis

    DTIC Science & Technology

    1990-09-01

    Theory of Constraints. Goldratt has developed a continuous improvement process model called the Theory of Constraints (TOC). Goldratt suggests using...management philosophy; however, in the context of this discussion, TOC will be referred to as a continuous improvement model. Actually, Goldratt does...not distinguish between TQM and TOC, but views these approaches as having identical goals and promoting a similar management philosophy ( Goldratt , 1990

  13. Cesium legacy safety project management work plan

    SciTech Connect

    Durham, J.S.

    1998-04-21

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell).

  14. Integrating quality, safety, and environment management systems.

    PubMed

    Winder, C

    1997-01-01

    Internationally consistent ISO standards are in use, or are being developed, for quality systems, environmental management, and occupational health and safety. These standards outline a model for the management of quality, environment or safety. In many respects the process of developing management systems for these matters contains a number of common elements, including obtaining commitment from senior management; instituting consultative mechanisms; developing a policy; identifying components of the management program; resourcing, implementing, and reviewing the program; and integrating the program into the organization's strategic plan. The necessity of developing separate management systems for different organizational aspects is wasteful and inefficient. Better management systems will be developed if they are integrated into a single management structure.

  15. 77 FR 63743 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ... Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the Sacramento Metropolitan Air Quality Management District (SMAQMD) portion of the California State Implementation Plan (SIP). These...

  16. Quality Assurance Planning for Region 6

    EPA Pesticide Factsheets

    The ultimate success of an environmental program or project depends on the quality of the environmental data collected and used in decision-making. EPA has developed guidances to help state and tribal governments develop Quality Assurance Program Plans.

  17. References on EPA Quality Assurance Project Plans

    EPA Pesticide Factsheets

    Provides requirements for the conduct of quality management practices, including quality assurance (QA) and quality control (QC) activities, for all environmental data collection and environmental technology programs performed by or for this Agency.

  18. Management Planning: Innovation on Campus.

    ERIC Educational Resources Information Center

    Hall, Stephen S. J.

    1973-01-01

    Management planning is a body of concepts and techniques designed to facilitate the analytical and forecasting processes within a department, to increase the decision-making prerogatives of the department director within predetermined guidelines, and to encourage and reinforce communication both among the departments and between the departments…

  19. Niagara River Toxics Management Plan

    EPA Pesticide Factsheets

    This 2007 Progress Report of the Niagara River Toxics Management Plan (NRTMP) summarizes progress made by the four parties in dealing with the 18 “Priority Toxics” through reductions in point and non-point sources to the Niagara River.

  20. Hanford Environmental Management Program Plan

    SciTech Connect

    DeFigh-Price, C.

    1989-09-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office (DOE-RL). Westinghouse Hanford Company (WHC) has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as reporting and planning and to facilitate compliance with environmental regulations. This document describes the scope of work funded by this program for Fiscal Year (FY) 1990, presents the prioritized tasks covered, the management structure in place and the assessment allocation methodology used to determine the FY 1990 assessments. 15 refs., 3 figs., 2 tabs.

  1. Forest Resource Management Plans: A Sustainability Approach

    ERIC Educational Resources Information Center

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  2. Total Quality Management (TQM)

    DTIC Science & Technology

    1989-09-01

    Business Planning Team. Develops NAVSEA Strategic Business Plan via environmental scan, identification of key issues, strategies, goals, objectives and...review meetings. Is a member of the NAVSEA 07 Business Planning Team. TOM Office. Issues/provides the final Shipyard Operations Plan for each fiscal

  3. Environmental Restoration Program Management Control Plan

    SciTech Connect

    Not Available

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives.

  4. Data and information quality strategic plan.

    PubMed

    Bethell, C

    The Environmental Protection Agency's Strategic Plan was developed in response to internal and external concerns about the integrity, consistency, and accuracy of EPA's environmental data. This document explains why a Strategic Plan is needed and the methodology used in its development, cites Agency models of excellence, and presents the six recommendations of EPA's Data and Information Quality Strategic Plan.

  5. The Development of a Total Quality Management Plan for David Grant USAF Medical Center Travis Air Force Base, California

    DTIC Science & Technology

    1991-12-01

    AUTHOR (S) WITT, BRIAN, KENDALL 13a. TYPE OF REPORT 13b. TIME COVERED 14. DATE OF REPORT (YearMonthDay) IS. PAGE COUNT FINAL FROM 7-90 TO 7-91...One author points out that "The DOD has mandated that you implement in military health care a TOM program. TOM has a strong foot hold. The philosophy... author , "It (TOM) is officially the management style of the Department of Defense" (Harben, 1989, p. 3). The Department of the Air Force has issued very

  6. 76 FR 77739 - Approval and Promulgation of Air Quality Implementation Plans; Massachusetts and New Hampshire...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-14

    ... comments to: Anne Arnold, Manager, Air Quality Planning Unit, Office of Ecosystem Protection, U.S... INFORMATION CONTACT: Richard P. Burkhart, Air Quality Planning Unit, U.S. Environmental Protection Agency, EPA... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Massachusetts...

  7. Total Quality Management (TQM) Bibliography

    DTIC Science & Technology

    1990-04-01

    GTE FIE COPY DTIC c" ECTE 8JUL 25 1990u TOTAL QUALITY MANAGEMENT (TQM) BIBLIOGRAPHY APRIL-1990 Jointly supported by __’__________-_________ Jointly...Arsenal, AL 35898-5241 1I. TITLE (Include Security Classification) TOTAL QUALITY MANAGEMENT (TQM) BIBL IRAPHY APRIL-1990 12. PERSONAL AUTHOR(S) Knott...implementation of the concept of total quality management (TQM). The selected coverage includes books, periodical articles, conference papers and reports. Coded

  8. The Art Institutes' Default Management Plan.

    ERIC Educational Resources Information Center

    Mazur, William J.; Blackmun, Ellen V.

    1989-01-01

    Describes the student loan default management plan of the Art Institutes. The plan includes a student financial plan worksheet, a student financial planner, and activities for students regarding their loan responsibilities. (JOW)

  9. 76 FR 27344 - Water Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-11

    ... land use, water quality, geology, biological and cultural resources, human health and safety... National Park Service Water Resources Management Plan/Environmental Impact Statement, Mojave National... Prepare a Water Resources Management Plan/ Environmental Impact Statement for Mojave National...

  10. SAPHIRE 8 Software Quality Assurance Plan

    SciTech Connect

    Curtis Smith

    2010-02-01

    This Quality Assurance (QA) Plan documents the QA activities that will be managed by the INL related to JCN N6423. The NRC developed the SAPHIRE computer code for performing probabilistic risk assessments (PRAs) using a personal computer (PC) at the Idaho National Laboratory (INL) under Job Code Number (JCN) L1429. SAPHIRE started out as a feasibility study for a PRA code to be run on a desktop personal PC and evolved through several phases into a state-of-the-art PRA code. The developmental activity of SAPHIRE was the result of two concurrent important events: The tremendous expansion of PC software and hardware capability of the 90s and the onset of a risk-informed regulation era.

  11. Transuranic Waste Characterization Quality Assurance Program Plan

    SciTech Connect

    1995-04-30

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes.

  12. Solid Waste Management Plan. Revision 4

    SciTech Connect

    1995-04-26

    The waste types discussed in this Solid Waste Management Plan are Municipal Solid Waste, Hazardous Waste, Low-Level Mixed Waste, Low-Level Radioactive Waste, and Transuranic Waste. The plan describes for each type of solid waste, the existing waste management facilities, the issues, and the assumptions used to develop the current management plan.

  13. Internal versus External Quality Management

    ERIC Educational Resources Information Center

    Hofman, Roelande H.; Dijkstra, Nynke J.; Hofman, W. H. Adriaan

    2008-01-01

    This article presents the findings of research into quality management in Dutch elementary schools using theories of school accountability and school improvement as fundamentals. The study is based on data gathered from almost 1000 school leaders. It attempts to determine whether different types of quality management exist in primary schools.…

  14. 222-S Laboratory Quality Assurance Plan. Revision 1

    SciTech Connect

    Meznarich, H.K.

    1995-07-31

    This Quality Assurance Plan provides,quality assurance (QA) guidance, regulatory QA requirements (e.g., 10 CFR 830.120), and quality control (QC) specifications for analytical service. This document follows the U.S Department of Energy (DOE) issued Hanford Analytical Services Quality Assurance Plan (HASQAP). In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. Quality assurance elements required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAMS-004) and Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (QAMS-005) from the US Environmental Protection Agency (EPA) are covered throughout this document. A quality assurance index is provided in the Appendix A. This document also provides and/or identifies the procedural information that governs laboratory operations. The personnel of the 222-S Laboratory and the Standards Laboratory including managers, analysts, QA/QC staff, auditors, and support staff shall use this document as guidance and instructions for their operational and quality assurance activities. Other organizations that conduct activities described in this document for the 222-S Laboratory shall follow this QA/QC document.

  15. Quality management of finite element analysis

    NASA Astrophysics Data System (ADS)

    Barlow, John

    1991-09-01

    A quality management system covering the use of finite element analysis is described. The main topics are as follows: acquisition, development and verification of software (including the software suppliers software quality control system), support, documentation, error control, internal software, software acceptance and release; development and qualification of analysis methods, including software evaluation, analysis procedure qualification and documentation, procedure quality checks, control of analysis procedure errors; product design and integrity analysis, including project quality assurance and analysis planning, task specification and allocation, analysis, execution, results checking and analysis records. Other issues include the commercial and business advantages of quality systems, project and technical management and the training and experience of personnel. The items are correlated with the requirements of International Standard Organization 9001.

  16. ICDF Complex Operations Waste Management Plan

    SciTech Connect

    W.M. Heileson

    2006-12-01

    This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

  17. Quality Assurance Project Plan Development Tool

    EPA Pesticide Factsheets

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  18. Strategic Planning and Market-Driven Management for Career Centers.

    ERIC Educational Resources Information Center

    Chonko, Lawrence B.; Burley, Elizabeth

    1992-01-01

    Asserts that, when university career center pursues a strategic plan and becomes market driven, it is not only perceived to be a quality organization, it is one. Explains philosophy of market-driven management, marketing concept, and implementation of market-driven career planning and placement center. (NB)

  19. Total Quality Management for Schools.

    ERIC Educational Resources Information Center

    Greenwood, Malcolm S.; Gaunt, Helen J.

    Education in the United Kingdom has been shaped by the advent of local school management and the rapid growth of grant-maintained schools. Total Quality Management (TQM) offers a new way of looking at management principles and structures by identifying the needs of both internal and external customers. This book applies principles of TQM…

  20. Overview of the Hanford risk management plan

    SciTech Connect

    Halverson, T.G.

    1998-03-26

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context.

  1. UMTRA technical assistance contractor quality assurance program plan

    SciTech Connect

    Not Available

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements.

  2. Total quality management implementation guidelines

    SciTech Connect

    Not Available

    1993-12-01

    These Guidelines were designed by the Energy Quality Council to help managers and supervisors in the Department of Energy Complex bring Total Quality Management to their organizations. Because the Department is composed of a rich mixture of diverse organizations, each with its own distinctive culture and quality history, these Guidelines are intended to be adapted by users to meet the particular needs of their organizations. For example, for organizations that are well along on their quality journeys and may already have achieved quality results, these Guidelines will provide a consistent methodology and terminology reference to foster their alignment with the overall Energy quality initiative. For organizations that are just beginning their quality journeys, these Guidelines will serve as a startup manual on quality principles applied in the Energy context.

  3. Implementing Total Quality Management in a University Setting.

    ERIC Educational Resources Information Center

    Coate, L. Edwin

    1991-01-01

    Oregon State University implemented Total Quality Management in nine phases: exploration; establishing a pilot study team; defining customer needs; adopting the breakthrough planning process; performing breakthrough planning in divisions; forming daily management teams; initiating cross-functional pilot projects; implementing cross-functional…

  4. Near Facility Environmental Monitoring Quality Assurance Project Plan

    SciTech Connect

    MCKINNEY, S.M.

    2000-05-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards.

  5. Total Quality Management in a Knowledge Management Perspective.

    ERIC Educational Resources Information Center

    Johannsen, Carl Gustav

    2000-01-01

    Presents theoretical considerations on both similarities and differences between information management and knowledge management and presents a conceptual model of basic knowledge management processes. Discusses total quality management and quality control in the context of information management. (Author/LRW)

  6. Air Pollution Monitoring | Air Quality Planning & Standards ...

    EPA Pesticide Factsheets

    2016-06-08

    The basic mission of the Office of Air Quality Planning and Standards is to preserve and improve the quality of our nation's air. To accomplish this, OAQPS must be able to evaluate the status of the atmosphere as compared to clean air standards and historical information.

  7. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    SciTech Connect

    Fix, N. J.

    2008-03-12

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  8. Medical technology management: from planning to application.

    PubMed

    David, Y; Jahnke, E

    2005-01-01

    Appropriate deployment of technological innovation contributes to improvement in the quality of healthcare delivered, the containment of cost, and access to the healthcare system. Hospitals have been allocating a significant portion of their resources to procuring and managing capital assets; they are continuously faced with demands for new medical equipment and are asked to manage existing inventory for which they are not well prepared. To objectively manage their investment, hospitals are developing medical technology management programs that need pertinent information and planning methodology for integrating new equipment into existing operations as well as for optimizing costs of ownership of all equipment. Clinical engineers can identify technological solutions based on the matching of new medical equipment with hospital's objectives. They can review their institution's overall technological position, determine strengths and weaknesses, develop equipment-selection criteria, supervise installations, train users and monitor post procurement performance to assure meeting of goals. This program, together with cost accounting analysis, will objectively guide the capital assets decision-making process. Cost accounting analysis is a multivariate function that includes determining the amount, based upon a strategic plan and financial resources, of funding to be allocated annually for medical equipment acquisition and replacement. Often this function works closely with clinical engineering to establish equipment useful life and prioritization of acquisition, upgrade, and replacement of inventory within budget confines and without conducting time consuming, individual financial capital project evaluations.

  9. NASA total quality management 1989 accomplishments report

    NASA Technical Reports Server (NTRS)

    Tai, Betty P. (Editor); Stewart, Lynne M. (Editor)

    1990-01-01

    NASA and contractor employees achieved many notable improvements in 1989. The highlights of those improvements, described in this seventh annual Accomplishments Report, demonstrate that the people who support NASA's activities are getting more involved in quality and continuous improvement efforts. Their gains solidly support NASA's and this Nation's goal to remain a leader in space exploration and in world-wide market competition, and, when communicated to others through avenues such as this report, foster improvement efforts across government and industry. The principles in practice which led to these process refinements are important cultural elements to any organization's productivity and quality efforts. The categories in this report reflect NASA principles set forth in the 1980's and are more commonly known today as Total Quality Management (TQM): top management leadership and support; strategic planning; focus on the customer; employee training and recognition; employee empowerment and teamwork; measurement and analysis; and quality assurance.

  10. Building air quality: Action plan, June 1998

    SciTech Connect

    1998-11-01

    To promote the use of these straightforward practices to improve IAQ, EPA and other leaders in the IAQ field developed this 8-step plan. This additional resource meets the needs of building owners and managers who want an easy-to-understand path for taking their building from current conditions and practices to the successful institutionalization of good IAQ management practices.

  11. Spent Nuclear Fuel project, project management plan

    SciTech Connect

    Fuquay, B.J.

    1995-10-25

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  12. Oak Ridge Reservation Waste Management Plan

    SciTech Connect

    Turner, J.W.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  13. Gas generation matrix depletion quality assurance project plan

    SciTech Connect

    1998-05-01

    The Los Alamos National Laboratory (LANL) is to provide the necessary expertise, experience, equipment and instrumentation, and management structure to: Conduct the matrix depletion experiments using simulated waste for quantifying matrix depletion effects; and Conduct experiments on 60 cylinders containing simulated TRU waste to determine the effects of matrix depletion on gas generation for transportation. All work for the Gas Generation Matrix Depletion (GGMD) experiment is performed according to the quality objectives established in the test plan and under this Quality Assurance Project Plan (QAPjP).

  14. FY 2015 - Stockpile Stewardship and Management Plan

    SciTech Connect

    2014-04-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  15. FY 2016 - Stockpile Stewardship and Management Plan

    SciTech Connect

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  16. Nutrient Management Certification for Delaware: Developing a Water Quality Curriculum

    ERIC Educational Resources Information Center

    Hansen, David J.; Binford, Gregory D.

    2004-01-01

    Water quality is a critical environmental, social, and political issue in Delaware. In the late 1990s, a series of events related to water quality issues led to the passage of a state nutrient management law. This new law required nutrient management planning and established a state certification program for nutrient users in the agricultural and…

  17. Implementing Total Quality Management: A Model for Research Libraries.

    ERIC Educational Resources Information Center

    Barnard, Susan B.

    1993-01-01

    Describes a model of Total Quality Management (TQM) developed by the Association of Research Libraries. The issues, elements and processes of a comprehensive TQM-based transition, including commitment by management, linkage to organizational strategic planning, organizational culture, understanding customers, and quality teams are covered.…

  18. Mendocino County Air Quality Management District Stationary Source Permits

    EPA Pesticide Factsheets

    The Environmental Protection Agency (EPA) is proposing action on four permitting rules submitted as a revision to the Mendocino County Air Quality Management District (“MCAQMD” or “the District”) portion of the applicable state implementation plan (SIP).

  19. Butte County Air Quality Management District Stationary Source Permits

    EPA Pesticide Factsheets

    U.S. EPA Public Notice: EPA is finalizing action on three permitting rules submitted as a revision to the Butte County Air Quality Management District (BCAQMD) portion of the California State Implementation Plan (SIP).

  20. Defense System Software Management Plan

    DTIC Science & Technology

    1976-03-01

    quality assurance discipline " Lack of quantitative data base for feedback of "lessons learned" 2. Actions to be Taken a. Service policies will be...and identify where they could be improved. Feedback from the field will be incorporated in updated versions of the guidelines and a cor cinued...c~0 .00 0 u 0 Efl ) 0 0 H 11-4 " . 00 oo Wro o,_ U ) z I QI- (n 0 0~ wH 000 1-5 MANAGEMENT PRACTICE AND PROCEDURE The action vehicle envf.sioned for

  1. Operational Management Plans: Status, Content, and Implementation

    DTIC Science & Technology

    1989-10-01

    A NATURAL RESOURCES RESEARCH PROGRAM US Amy CrpsMISCELLANEOUS PAPER R-89-2 ofEgier OPERATIONAL MANAGEMENT PLANS: STATUS, CONTENT , AND IMPLEMENTATION...NO NO. CCESSIONNO/ 32503 11. TITLE (incude Security Cla m karion) Operational Management Plans: Status, Content , and Implementation 12. PERSONAL...reverse if necessaty and identify by block number) - This report presents the current status, content , and implecrntation of Operational Management Plans

  2. Research and development quality assurance planning

    SciTech Connect

    Hoke, P.B.

    1990-05-14

    Planning for quality assurance (QA) in research and development (R D) is like stealing eggs without waking up the chickens. The QA program should be as unobtrusive as possible. Researchers require a QA program that affords them an environment capable of supporting repeatable experiments with accurate data without unduly stifling their creative abilities. Careful advance planning ensures that the intensity of control provided by quality-related systems is commensurate with the importance and scope of the activities being performed. Good scientific practices applied to small bench-scale projects may require minimal additional controls. As projects increase in size and complexity the controls imposed through planning must, by necessity, be increased. Research and development QA planning, just like any other planning, involves all affected individuals. The application of control systems is determined by factors such as customer or sponsor requirements, the importance of an item or activity to the experiment's success, and the organizational complexity of the project. Many larger experiments are highly dependent on quality-related support activities such as calibration, engineering design, and inspection provided by organizations outside the R D group. Since, in most cases, the expense of support activities is taken directly from funds available for research, it is important for the researchers to be involved in the planning efforts to help determine and agree with the level of QA effort required. A single plan will often suffice for organizations engaged in large numbers of similar experiments. Complex experiments may require unique QA plans or additions to existing plans. Once implemented, the R D QA plans, like any others, require audits or surveillances and may require revisions if the scope of the experiment changes. 1 ref., 1 fig.

  3. Assessment of the Quality Management Models in Higher Education

    ERIC Educational Resources Information Center

    Basar, Gulsun; Altinay, Zehra; Dagli, Gokmen; Altinay, Fahriye

    2016-01-01

    This study involves the assessment of the quality management models in Higher Education by explaining the importance of quality in higher education and by examining the higher education quality assurance system practices in other countries. The qualitative study was carried out with the members of the Higher Education Planning, Evaluation,…

  4. What is an Integrated Waste Management Plan

    EPA Pesticide Factsheets

    This document describes the Integrated Waste Management Plans (IWMPs) as an efficient and cost-effective way to reduce open dumping, effectively manage solid waste, and protect human health and the environment.

  5. Sport Facility Planning and Management. Sport Management Library.

    ERIC Educational Resources Information Center

    Farmer, Peter J.; Mulrooney, Aaron L.; Ammon, Rob, Jr.

    Students of sports facilities management will need to acquire a wide variety of managerial skills and knowledge in order to be adequately prepared to plan and manage these facilities. This textbook offers students a mix of practical examples and recognized theory to help them in the planning, constructing, promoting, and managing of sports…

  6. [Informatics data quality and management].

    PubMed

    Feng, Rung-Chuang

    2009-06-01

    While the quality of data affects every aspect of business, it is frequently overlooked in terms of customer data integration, data warehousing, business intelligence and enterprise applications. Regardless of which data terms are used, a high level of data quality is a critical base condition essential to satisfy user needs and facilitate the development of effective applications. In this paper, the author introduces methods, a management framework and the major factors involved in data quality assessment. Author also integrates expert opinions to develop data quality assessment tools.

  7. Air quality management in Mexico.

    PubMed

    Fernández-Bremauntz, Adrián

    2008-01-01

    Several significant program and policy measures have been implemented in Mexico over the past 15 yr to improve air quality. This article provides an overview of air quality management strategies in Mexico, including (1) policy initiatives such as vehicle use restrictions, air quality standards, vehicle emissions, and fuel quality standards, and (2) supporting programs including establishment of a national emission inventory, an air pollution episodes program, and the implementation of exposure and health effects studies. Trends in air pollution episodes and ambient air pollutant concentrations are described.

  8. AVLIS Production Plant Preliminary Quality Assurance Plan and Assessment

    SciTech Connect

    Not Available

    1984-11-15

    This preliminary Quality Assurance Plan and Assessment establishes the Quality Assurance requirements for the AVLIS Production Plant Project. The Quality Assurance Plan defines the management approach, organization, interfaces, and controls that will be used in order to provide adequate confidence that the AVLIS Production Plant design, procurement, construction, fabrication, installation, start-up, and operation are accomplished within established goals and objectives. The Quality Assurance Program defined in this document includes a system for assessing those elements of the project whose failure would have a significant impact on safety, environment, schedule, cost, or overall plant objectives. As elements of the project are assessed, classifications are provided to establish and assure that special actions are defined which will eliminate or reduce the probability of occurrence or control the consequences of failure. 8 figures, 18 tables.

  9. National Ignition Facility quality assurance program plan revision 2

    SciTech Connect

    Wolfe, C R

    1998-06-01

    NIF Project activities will be conducted in a manner consistent with the guidance and direction of the DOE Order on Quality Assurance (414.1), the LLNL QA Program, and the Laser Directorate QA Plan. Quality assurance criteria will be applied in a graded manner to achieve a balance between the rigor of application of QA measures and the scale, cost, and complexity of the work involved. Accountability for quality is everyone's, extending from the Project Manager through established lines of authority to all Project personnel, who are responsible for the requisite quality of their own work. The NLF QA Program will be implemented by personnel conducting their activities to meet requirements and expectations, according to established plans and procedures that reflect the way business is to be conducted on the Project.

  10. Cost and quality planning for large NASA programs

    NASA Technical Reports Server (NTRS)

    Rone, Kyle Y.

    1990-01-01

    The Software Cost and Quality Engineering methodology developed over the last two decades at IBM Federal Sector Div. is used to plan the NASA Space Station Data Management System (DMS). An ongoing project to capture this methodology, which is built on a foundation of experiences and lessons learned, has resulted in the development of a PC-based tool that integrates cost and quality forecasting methodologies and data in a consistent manner. This tool, Software Cost and Quality Engineering Starter Set (SCQESS), is being used to assist in the DMS costing exercises. At the same time, DMS planning serves as a forcing function and provides a platform for the continuing, iterative development, calibration, and validation and verification of SCQESS. The data that forms the cost and quality engineering data base is derived from more than 17 years of development of NASA Space Shuttle software, ranging from low criticality, low complexity support tools to highly complex and highly critical onboard software.

  11. Total quality management issues in managed care.

    PubMed

    McLaughlin, C P; Kaluzny, A D

    1997-01-01

    The implementation of total quality management (TQM) in health care has gone on in parallel with the growth of managed care. What is the interaction between the two? Key issues are the ascendance of cost control over quality in many areas, erosion of employee commitment and loyalty, and a short-run orientation. Associated with this is an emphasis on organizational learning rather than learning by autonomous professionals. Both TQM and managed care acknowledge the dynamic nature of clinical processes and the ability and responsibility of both institutions and clinicians to improve their processes. Both are consistent with efforts to identify and implement best practices. However, these similarities should not mask fundamental differences. Continuous improvement must shift its focus from avoiding unnecessary variation to facilitating rapid organizational learning and institutionalizing mass customization into the delivery of health services.

  12. Revision 2 of the Enbridge Quality Assurance Project Plan

    EPA Pesticide Factsheets

    This Quality Assurance Project Plan (QAPP) presents Revision 2 of the organization, objectives, planned activities, and specific quality assurance/quality control (QA/QC) procedures associated with the Enbridge Marshall Pipeline Release Project.

  13. Lightning Mapper Sensor Lens Assembly S.O. 5459: Project Management Plan

    NASA Technical Reports Server (NTRS)

    Zeidler, Janet

    1999-01-01

    Kaiser Electro-Optics, Inc. (KEO) has developed this Project Management Plan for the Lightning Mapper Sensor (LMS) program. KEO has integrated a team of experts in a structured program management organization to meet the needs of the LMS program. The project plan discusses KEO's approach to critical program elements including Program Management, Quality Assurance, Configuration Management, and Schedule.

  14. Solid Waste Management Planning--A Methodology

    ERIC Educational Resources Information Center

    Theisen, Hilary M.; And Others

    1975-01-01

    This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)

  15. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names...

  16. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names...

  17. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names...

  18. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names...

  19. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names...

  20. SNL/CA Cultural Resources Management Plan.

    SciTech Connect

    Larsen, Barbara L.

    2005-11-01

    The SNL/CA Cultural Resources Management Plan satisfies the site's Environmental Management System requirement to promote long-term stewardship of cultural resources. The plan summarizes the cultural and historical setting of the site, identifies existing procedures and processes that support protection and preservation of resources, and outlines actions that would be initiated if cultural resources were discovered onsite in the future.3

  1. Managing Dualities in Planned Change Initiatives

    ERIC Educational Resources Information Center

    Barge, J. Kevin; Lee, Michael; Maddux, Kristy; Nabring, Richard; Townsend, Bryan

    2008-01-01

    Dualities play an important role in creating the conditions for change and managing planned change initiatives. Building on Seo, Putnam, and Bartunek's (2003) work, this study focuses on the dualities associated with managing change processes. A case study of a planned change process called the Circle of Prosperity Initiative, a multi-stakeholder…

  2. Quality Management and Calibration

    NASA Astrophysics Data System (ADS)

    Merkus, Henk G.

    Good specification of a product’s performance requires adequate characterization of relevant properties. Particulate products are usually characterized by some PSD, shape or porosity parameter(s). For proper characterization, adequate sampling, dispersion, and measurement procedures should be available or developed and skilful personnel should use appropriate, well-calibrated/qualified equipment. The characterization should be executed, in agreement with customers, in a wellorganized laboratory. All related aspects should be laid down in a quality handbook. The laboratory should provide proof for its capability to perform the characterization of stated products and/or reference materials within stated confidence limits. This can be done either by internal validation and audits or by external GLP accreditation.

  3. Discharge planning quality from the carer perspective.

    PubMed

    Grimmer, K A; Moss, J R; Gill, T K

    2000-01-01

    Discharge planning endeavours to assist the transition of patients from the acute hospital setting into the community. We examined the quality of discharge planning from the perspective of the carer. Spouses were the most common carers for the elderly patients in our study. Many carers were also elderly, with their own health problems. Using a new instrument (entitled PREPARED) (K. Grimmer and J. Moss, Int J Qual Health Care (in press)), carers rated the quality of planning for discharge much lower than did the patient, indicating that their needs were often not met when discharge was being planned. In free text responses, carers expressed their dissatisfaction over communication about how the family would cope once the patient went home. Carers generally had lower summary mental quality of life scores than the Australian norms (as measured by the SF-36 health survey (J. Ware and R. Sherbourne, Med Care 1992; 30: 473-483)), suggesting that the caring role may have impacted upon their emotional wellbeing. The rate of use of community services in the first week post-discharge was low, suggesting that carers and patients carried the majority of the burden immediately after discharge. We suggest that planning for hospital discharge requires more consideration of the carer.

  4. Software quality assurance plan for GCS

    NASA Technical Reports Server (NTRS)

    Duncan, Stephen E.; Bailey, Elizabeth K.

    1990-01-01

    The software quality assurance (SQA) function for the Guidance and Control Software (GCS) project which is part of a software error studies research program is described. The SQA plan outlines all of the procedures, controls, and audits to be carried out by the SQA organization to ensure adherence to the policies, procedures, and standards for the GCS project.

  5. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    SciTech Connect

    Fix, N. J.

    2007-01-10

    The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  6. Strategic Planning and Army Installation Management.

    DTIC Science & Technology

    1996-01-01

    program. The U.S. Army has adopted the Malcolm Baldrige National Quality Award criteria for use in the ACOE program. Strategic planning is one of the...seven pillars of the Baldrige criteria. The Army has recognized that strategic planning is the key to the future. Strategic planning is the key to...and utilization of strategic planning . This paper examines through case study analysis several civilian communities and lessons learned through their

  7. Information resource management strategic business planning.

    PubMed

    Fogelsonger, L

    1995-08-01

    The business process and information management, rather than technology and systems, must be considered in today's health care environment. The article discusses the contents of an information resource management (IRM) strategic business plan and a five-step process used to construct the plan. Examples of strategic goals and objectives from an actual case study are provided. The resulting IRM strategic plan is designed to be used as a management tool that provides the flexibility and cohesiveness required to manage information in the current dynamic and resource-constrained environment.

  8. Systems Engineering Management Plan. Volume 5 of the MRS Project Management Plan

    SciTech Connect

    Not Available

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP).

  9. Leadership and management for quality.

    PubMed

    Gillam, Steve; Siriwardena, A Niroshan

    2013-01-01

    This is the third in a series of articles about the science of quality improvement. Leadership and management are required for change and are therefore important for all quality improvement initiatives. We describe the differences between and features of each, and how they support change in individuals, groups and organisations according to the culture and characteristics of the latter. Finally, we see that leadership competencies are conceptualised in the NHS Leadership Framework and how this can be applied to quality improvement in general practice and healthcare more generally.

  10. A study of IMRT planning parameters on planning efficiency, delivery efficiency, and plan quality

    SciTech Connect

    Mittauer, Kathryn; Lu Bo; Yan Guanghua; Kahler, Darren; Amdur, Robert; Liu Chihray; Gopal, Arun

    2013-06-15

    Purpose: To improve planning and delivery efficiency of head and neck IMRT without compromising planning quality through the evaluation of inverse planning parameters.Methods: Eleven head and neck patients with pre-existing IMRT treatment plans were selected for this retrospective study. The Pinnacle treatment planning system (TPS) was used to compute new treatment plans for each patient by varying the individual or the combined parameters of dose/fluence grid resolution, minimum MU per segment, and minimum segment area. Forty-five plans per patient were generated with the following variations: 4 dose/fluence grid resolution plans, 12 minimum segment area plans, 9 minimum MU plans, and 20 combined minimum segment area/minimum MU plans. Each plan was evaluated and compared to others based on dose volume histograms (DVHs) (i.e., plan quality), planning time, and delivery time. To evaluate delivery efficiency, a model was developed that estimated the delivery time of a treatment plan, and validated through measurements on an Elekta Synergy linear accelerator. Results: The uncertainty (i.e., variation) of the dose-volume index due to dose calculation grid variation was as high as 8.2% (5.5 Gy in absolute dose) for planning target volumes (PTVs) and 13.3% (2.1 Gy in absolute dose) for planning at risk volumes (PRVs). Comparison results of dose distributions indicated that smaller volumes were more susceptible to uncertainties. The grid resolution of a 4 mm dose grid with a 2 mm fluence grid was recommended, since it can reduce the final dose calculation time by 63% compared to the accepted standard (2 mm dose grid with a 2 mm fluence grid resolution) while maintaining a similar level of dose-volume index variation. Threshold values that maintained adequate plan quality (DVH results of the PTVs and PRVs remained satisfied for their dose objectives) were 5 cm{sup 2} for minimum segment area and 5 MU for minimum MU. As the minimum MU parameter was increased, the number of

  11. Independent External Peer Review Report of the Dredged Material Management Plan for Green Bay, Wisconsin

    DTIC Science & Technology

    2011-06-27

    implementation, maintenance, and continual improvement of its International Organization for Standardization ( ISO ) 9001 :2008 Compliant Quality Management ... managing the IEPR. Noblis performed the requirements of this contract in accordance with its Quality Management System, which is compliant with...International Organization for Standardization ( ISO ) 9000. Specifically, Noblis prepared a Work Plan to define and manage the process for conducting the IEPR

  12. Partnerships for Quality: A Statewide Plan for Developing and Implementing a Total Quality Curriculum Delivered through Oregon's Community Colleges.

    ERIC Educational Resources Information Center

    Oregon State Economic Development Dept., Salem.

    The Oregon Advanced Technology Consortium (OATC) created the Partnerships for Quality Project (PQP) to improve Oregon's community colleges by developing a total quality curriculum (TQC) based on the beliefs and practices of total quality management (TQM). This report summarizes the recommendations of the PQP and presents a plan of action for the…

  13. [Evaluation model for municipal health planning management].

    PubMed

    Berretta, Isabel Quint; Lacerda, Josimari Telino de; Calvo, Maria Cristina Marino

    2011-11-01

    This article presents an evaluation model for municipal health planning management. The basis was a methodological study using the health planning theoretical framework to construct the evaluation matrix, in addition to an understanding of the organization and functioning designed by the Planning System of the Unified National Health System (PlanejaSUS) and definition of responsibilities for the municipal level under the Health Management Pact. The indicators and measures were validated using the consensus technique with specialists in planning and evaluation. The applicability was tested in 271 municipalities (counties) in the State of Santa Catarina, Brazil, based on population size. The proposed model features two evaluative dimensions which reflect the municipal health administrator's commitment to planning: the guarantee of resources and the internal and external relations needed for developing the activities. The data were analyzed using indicators, sub-dimensions, and dimensions. The study concludes that the model is feasible and appropriate for evaluating municipal performance in health planning management.

  14. 48 CFR 37.604 - Quality assurance surveillance plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Quality assurance... assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans are in Subpart 46.4. The Government may either prepare the quality assurance surveillance plan...

  15. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory...

  16. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed...

  17. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory...

  18. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory...

  19. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed...

  20. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory...

  1. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for...

  2. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed...

  3. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for...

  4. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for...

  5. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed...

  6. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for...

  7. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory...

  8. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for...

  9. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed...

  10. Indoor Air Quality Management Program.

    ERIC Educational Resources Information Center

    Anne Arundel County Public Schools, Annapolis, MD.

    In an effort to provide Indoor Air Quality (IAQ) management guidance, Anne Arundel County Public Schools was selected by the Maryland State Department of Education to develop a program that could be used by other school systems. A major goal was to produce a handbook that was "user friendly." Hence, its contents are a mix of history,…

  11. E-Service Quality Management

    ERIC Educational Resources Information Center

    Batagan, Lorena; Pocovnicu, Adrian; Capisizu, Sergiu

    2009-01-01

    A characteristic of today's society is the increasing use of modern information and communication technologies in all areas. Computer applications, called e-services, are being developed to provide efficient access to services, electronically. Quality management systems are needed to provide a consistent way to select, evaluate, prioritize and…

  12. S-PRIME Thermionic Space Nuclear Power System Quality Assurance Program Plan

    SciTech Connect

    Jones, C.M.

    1992-09-23

    This Quality Assurance Program Plan (QAPP)describes how the Thermionic Space Nuclear Power System Design and Technology Demonstration Project addresses the Quality Assurance requirements delineated in DOE Order 5700.6C and the Thermionic Program Management Plan 214PMP000001. The Quality Assurance Program is based on the following fundamental principles, which Rocketdyne endorses and the QA Project Manager and Program Manager shall enforce: Quality Achievement is a continuing responsibility of line organization at all levels; the Quality Assurance organization through the effective overview of work, gives additional assurance that specified requirements are met; risk is the fundamental consideration in determining to what extent the Quality Assurance Plan should be applied to items and processes; action is based on facts and analysis, customer driven quality, strong quality leadership and continuous improvement.

  13. Configuration Management Plan for K Basins

    SciTech Connect

    Weir, W.R.; Laney, T.

    1995-01-27

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93, {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.

  14. Quality-assurance plan for the analysis of suspended sediment by the U.S. Geological Survey in Montana

    USGS Publications Warehouse

    Dodge, Kent A.; Lambing, John H.

    2006-01-01

    A quality-assurance plan has been developed for use by the sediment laboratory of the U.S. Geological Survey Montana Water Science Center in conducting activities related to the analysis of suspended sediment. The plan documents quality-assurance policies for sediment-laboratory certification, personnel responsibilities and training, documentation requirements, and laboratory safety. The plan also documents quality-assurance procedures related to laboratory equipment and supplies, sample management, sample analysis, analytical quality control, and data management.

  15. Quality assurance FY 1995 site support program plan WBS 6.7.2.5

    SciTech Connect

    Dell, L.D.

    1994-09-01

    This report is a summary of the quality assurance plan and program for the Westinghouse Hanford Company. The quality assurance plan verifies that the appropriate quality assurance programs and controls are applied to activities that affect quality related to work in: waste management; environmental activities (restoration, remediation, and monitoring); implementation of environmental, state, local, and federal regulations; tri-party agreement activities; facility operation and deactivation/transition to shutdown; new facility construction and operation.

  16. Planning and Management for Excellence and Efficiency in Higher Education.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Paris (France).

    This round table discussion involved some 50 participants and seven panelists and focused on planning and management for excellence and efficiency in higher education. Basic issues or problems facing higher education were identified including coping with increasing student numbers, raising the quality of teaching, training and research programs,…

  17. 222-S laboratory quality assurance plan

    SciTech Connect

    Meznarich, H.K.

    1995-04-01

    This document provides quality assurance guidelines and quality control requirements for analytical services. This document is designed on the basis of Hanford Analytical Services Quality Assurance Plan (HASQAP) technical guidelines and is used for governing 222-S and 222-SA analytical and quality control activities. The 222-S Laboratory provides analytical services to various clients including, but not limited to, waste characterization for the Tank Waste Remediation Systems (TWRS), waste characterization for regulatory waste treatment, storage, and disposal (TSD), regulatory compliance samples, radiation screening, process samples, and TPA samples. A graded approach is applied on the level of sample custody, QC, data verification, and data reporting to meet the specific needs of the client.

  18. 78 FR 77550 - Integrated Corridor Management Deployment Planning Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... Federal Highway Administration Integrated Corridor Management Deployment Planning Grants AGENCY: Federal... is extending the application period for the Integrated Corridor Management Deployment Planning Grants... Integrated Corridor Management Deployment Planning Grants. The purpose of this notice was to invite...

  19. 200 Area Liquid Effluent Facilities -- Quality assurance program plan

    SciTech Connect

    Fernandez, L.

    1995-03-13

    This Quality Assurance Program Plan (QAPP) describes the quality assurance and management controls used by the 200 Area Liquid Effluent Facilities (LEF) to perform its activities in accordance with DOE Order 5700.6C. The 200 Area LEF consists of the following facilities: Effluent Treatment Facility (ETF); Treated Effluent Disposal Facility (TEDF); Liquid Effluent Retention facility (LERF); and Truck Loading Facility -- (Project W291). The intent is to ensure that all activities such as collection of effluents, treatment, concentration of secondary wastes, verification, sampling and disposal of treated effluents and solids related with the LEF operations, conform to established requirements.

  20. Mixed waste management facility FY94 plan

    SciTech Connect

    Streit, R.

    1994-01-01

    This document is a progress report detailing the different aspects of the project plan. Included are the topics of quality assurance, safety and cost as they relate to the processing and storage of hazardous materials and radioactive waste.

  1. Waste Isolation Pilot Plant, Land Management Plan

    SciTech Connect

    Not Available

    1993-12-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

  2. Water quality improvement plan for Greater Vancouver

    SciTech Connect

    Foellmi, S.N. . Environmental Div.); Neden, D.G. ); Dawson, R.N. )

    1993-10-01

    The Greater Vancouver Regional District commissioned an 18-month planning and predesign study to define the components in a comprehensive water and predesign study to define the components in a comprehensive water quality improvement plan for its 2,500-ML/d (660-mgd) system. The study included three primary tasks: (1) predesign of disinfection and corrosion control facilities, (2) a 12-month pilot testing program using parallel pilot plants at the Seymour and Capilano water supply reservoirs, and (3) planning for future filtration plants. The results of the study identified chlorine, ammonia, sulfur dioxide, soda ash, and carbon dioxide in a two-stage treatment approach as the recommended disinfection and corrosion control scheme for the low-pH, low-alkalinity water supplies. The pilot-plant studies confirmed that direct filtration using deep-bed monomedium filters operating at a loading rate of 22.5 m/h provided excellent treatment performance and productivity over a wide range of raw-water quality. Ozonation was studied extensively and found not to be beneficial in the overall treatment performance. The phased improvement plan for the disinfection, corrosion control, and filtration facilities has an estimated capital cost of about Can$459 million.

  3. Implementing Total Quality Management in the School: Challenges and Opportunity.

    ERIC Educational Resources Information Center

    Murgatroyd, Stephen

    1993-01-01

    Total Quality Management (TQM) is not another"add-on" but a wholly reconceived approach to managing educational institutions. Some common start-up problems are lack of feasible leadership commitment, poor data and deployment plans, and inadequate managerial skills. Postlaunch problems include team and measurement mania, overzealous selling of…

  4. Managing Uncertainty: Thinking and Planning Strategically.

    ERIC Educational Resources Information Center

    Lorenzo, Albert L.

    1993-01-01

    Argues that rapid change and tight resources demand reality-based planning, rather than planning models that ignore internal and external customers or emphasize process over product. Describes the Strategic Guidance Model (SGM) which provides colleges with strategic visioning, organizational assessment, environmental scanning, quality improvement,…

  5. Quality control and quality assurance plan for bridge channel-stability assessments in Massachusetts

    USGS Publications Warehouse

    Parker, Gene W.; Pinson, Harlow

    1993-01-01

    A quality control and quality assurance plan has been implemented as part of the Massachusetts bridge scour and channel-stability assessment program. This program is being conducted by the U.S. Geological Survey, Massachusetts-Rhode Island District, in cooperation with the Massachusetts Highway Department. Project personnel training, data-integrity verification, and new data-management technologies are being utilized in the channel-stability assessment process to improve current data-collection and management techniques. An automated data-collection procedure has been implemented to standardize channel-stability assessments on a regular basis within the State. An object-oriented data structure and new image management tools are used to produce a data base enabling management of multiple data object classes. Data will be reviewed by assessors and data base managers before being merged into a master bridge-scour data base, which includes automated data-verification routines.

  6. UMTRA technical assistance contractor Quality Assurance Program Plan. Revision 4

    SciTech Connect

    Pehrson, P.

    1993-10-12

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation.

  7. Total Quality Management in Education. Second Edition.

    ERIC Educational Resources Information Center

    Sallis, Edward

    Quality is at the top of most agendas, and improving quality is probably the most important task facing any institution. In addition, quality is difficult to define or measure. This book, the second edition of "Total Quality Management in Education," introduces the key concepts of Total Quality Management (TQM) and demonstrates how they…

  8. Introduction to Soil Fumigant Management Plans

    EPA Pesticide Factsheets

    Soil fumigant pesticide labels require users to prepare a site-specific fumigation management plan (FMP) before the application begins. EPA has developed templates that outline the elements required by the labels.

  9. BROOKHAVEN NATIONAL LABORATORY WILDLIFE MANAGEMENT PLAN.

    SciTech Connect

    NAIDU,J.R.

    2002-10-22

    The purpose of the Wildlife Management Plan (WMP) is to promote stewardship of the natural resources found at the Brookhaven National Laboratory (BNL), and to integrate their protection with pursuit of the Laboratory's mission.

  10. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  11. Buried waste integrated demonstration configuration management plan

    SciTech Connect

    Cannon, P.G.

    1992-02-01

    This document defines plans for the configuration management requirements for the Buried Waste Integrated Demonstration (BWID) Program. Since BWID is managed programmatically by the Waste Technology Development Department (WTDD), WTDD Program Directive (PD) 1.5 (Document Preparation, Review, Approval, Publication, Management and Change Control) is to be followed for all internal EG G Idaho, Inc., BWID programmatic documentation. BWID documentation generated by organizations external to EG G Idaho is not covered by this revision of the Configuration Management Plan (CMP), but will be addressed in subsequent revisions.

  12. Buried waste integrated demonstration configuration management plan

    SciTech Connect

    Cannon, P.G.

    1992-02-01

    This document defines plans for the configuration management requirements for the Buried Waste Integrated Demonstration (BWID) Program. Since BWID is managed programmatically by the Waste Technology Development Department (WTDD), WTDD Program Directive (PD) 1.5 (Document Preparation, Review, Approval, Publication, Management and Change Control) is to be followed for all internal EG&G Idaho, Inc., BWID programmatic documentation. BWID documentation generated by organizations external to EG&G Idaho is not covered by this revision of the Configuration Management Plan (CMP), but will be addressed in subsequent revisions.

  13. Special event planning for the emergency manager.

    PubMed

    Gaynor, Peter T

    2009-11-01

    In the domain of emergency management and homeland security there is a lack of a formal planning process at the local level when it comes to special event planning. The unique nature of special event planning demands an understanding of the planning process for both traditional and non-traditional planning partners. This understanding will make certain that local governments apply due diligence when planning for the safety of the public. This paper offers a practical roadmap for planning at the local level. It will address those 'special events' that are beyond routine local events but not of a sufficient scale to be granted National Special Security Event status. Due to the infrequency of 'special events' in most communities, it is imperative that deliberate planning takes place. Upon conclusion, the reader will be able to construct a planning process tailored to the needs of their community, guide both traditional and non-traditional planning partners through the planning process, determine priorities, explore alternatives, plan for contingencies, conduct a confirmation brief, facilitate operations and assemble an after-action report and improvement plan.

  14. Do You Have a Crisis Management Plan?

    ERIC Educational Resources Information Center

    Pleviak, Walter; Milkevitch, Frank

    2001-01-01

    Although certain crises cannot be prevented, reactions to many can be planned. A crisis-management team should be organized for each building. Critical crisis-plan elements include telephone trees, forms, reference articles, sample letters, and processes for dealing with local media. Spokespersons should have facts straight before speaking. (MLH)

  15. Draft of the PHENIX Management Plan

    SciTech Connect

    Not Available

    1994-03-10

    The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants.

  16. A groundwater management plan for Stuttgart.

    PubMed

    Vasin, Sandra; Carle, Achim; Lang, Ulrich; Kirchholtes, Hermann Josef

    2016-09-01

    In general, groundwater in urban areas is exposed to anthropogenic influence and suffers from concentrations of contaminants. Stuttgart, as a highly industrialized city, has more than 5000 contaminated sites which might influence the Stuttgart's mineral water quality. Despite tremendous efforts and intensive single site orientated remediation since 1984 in downtown, the mineral springs were still affected with chlorinated hydrocarbons at low concentrations. Therefore, the applied practices of environmental management and measures for mitigation of pollution sources were not sufficient and had to be adjusted. The main goal of this study is to define an integral remediation plan (a groundwater management plan), focusing on the key sources of chlorinated solvents which are relevant for the mineral springs. For the large-scale investigated area of 26.6km(2) and eight aquifers, an extensive investigation and characterization methods were used in order to delineate the contamination plumes. By means of a 3D numerical model, the prioritization of the contaminated sites could be performed. Five contaminated sites with high remediation priority and need for optimized or additional remediation efforts were determined. For those five contaminated sites feasibility studies were performed which resulted in recommendation of remediation measures with total costs of more than 12.5 million euros. The proposed strategy and approach are suitable for multiple sources of contamination. Only in this way, the contributions of single contaminated sites to the total groundwater contamination can be identified and local remediation measures with their spatial impact simulated. Due to very complex geological conditions, technically there is no alternative to this strategy in order to achieve the contamination reduction in groundwater.

  17. 77 FR 47535 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the Sacramento Metropolitan Air Quality Management District portion of the California State Implementation Plan (SIP). This revision concerns...

  18. ISO 9000 Quality Management System

    NASA Astrophysics Data System (ADS)

    Hadjicostas, Evsevios

    The ISO 9000 series describes a quality management system applicable to any organization. In this chapter we present the requirements of the standard in a way that is as close as possible to the needs of analytical laboratories. The sequence of the requirements follows that in the ISO 9001:2008 standard. In addition, the guidelines for performance improvement set out in the ISO 9004 are reviewed. Both standards should be used as a reference as well as the basis for further elaboration.

  19. Readings on Managing Organizational Quality

    DTIC Science & Technology

    1990-05-01

    April-November 1989 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS Readings on Managing Organizational Quality Program Element O&M, N, Work Unit 98-9POC0012...competitive advantage. Several articles make explicit old working assumptions and suggest new ones to replace them. 14. SUBJECT TERMS 15. NUMBER OF...sponsored by the Office of the Under Secretary of the Navy and funded under Operations and Maintenance, Navy (O&M,N), Work Unit No. 98-9POC0012. This

  20. SU-D-BRD-03: Improving Plan Quality with Automation of Treatment Plan Checks

    SciTech Connect

    Covington, E; Younge, K; Chen, X; Lee, C; Matuszak, M; Kessler, M; Acosta, E; Orow, A; Filpansick, S; Moran, J; Keranen, W

    2015-06-15

    Purpose: To evaluate the effectiveness of an automated plan check tool to improve first-time plan quality as well as standardize and document performance of physics plan checks. Methods: The Plan Checker Tool (PCT) uses the Eclipse Scripting API to check and compare data from the treatment planning system (TPS) and treatment management system (TMS). PCT was created to improve first-time plan quality, reduce patient delays, increase efficiency of our electronic workflow, and to standardize and partially automate plan checks in the TPS. A framework was developed which can be configured with different reference values and types of checks. One example is the prescribed dose check where PCT flags the user when the planned dose and the prescribed dose disagree. PCT includes a comprehensive checklist of automated and manual checks that are documented when performed by the user. A PDF report is created and automatically uploaded into the TMS. Prior to and during PCT development, errors caught during plan checks and also patient delays were tracked in order to prioritize which checks should be automated. The most common and significant errors were determined. Results: Nineteen of 33 checklist items were automated with data extracted with the PCT. These include checks for prescription, reference point and machine scheduling errors which are three of the top six causes of patient delays related to physics and dosimetry. Since the clinical roll-out, no delays have been due to errors that are automatically flagged by the PCT. Development continues to automate the remaining checks. Conclusion: With PCT, 57% of the physics plan checklist has been partially or fully automated. Treatment delays have declined since release of the PCT for clinical use. By tracking delays and errors, we have been able to measure the effectiveness of automating checks and are using this information to prioritize future development. This project was supported in part by P01CA059827.

  1. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or...

  2. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or...

  3. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or...

  4. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or...

  5. The Newcastle (Australia) Airshed Management Action Plan (NAMAP)

    SciTech Connect

    Bridgman, H.A.; Cameron, C.

    1999-07-01

    The Newcastle (NSW Australia) Airshed Management Action Plan (NAMAP) has recently been completed, and is a forerunner toward urban air pollution management in Australia. NAMAP was developed by the Newcastle City Council in partnership with the community, science, and industry, as part of Council's commitments in it's environmental plan. Its purpose is to provide action strategies which will lead to improvements in Newcastle's air quality for future generations. Key issues addressed in the plan include: minimizing industrial emissions; reducing growth of vehicle kilometers traveled; improving energy efficiency; managing air quality from small and medium enterprises; reducing the impacts of solid fuel burning; improving management from councils own activities; making motor vehicle run clean; reviewing performance; and developing better solutions. Management strategies include community education, land use planning, regulation, economic incentives, monitoring, performance indicators and reporting. This paper describes the structure and development of NAMAP through stages from understanding the air pollution problem to recommending of action strategies for reduction and control. The development and implementation of NAMAP is particularly important as major changes in Newcastle's heavy industrial base will occur in the future, creating a restructuring in the relative importance of sources and primary emissions. NAMAP provides an excellent example of a cooperative effort to minimize air pollution problems in a small city.

  6. Strategic Planning for Information Resources Management.

    ERIC Educational Resources Information Center

    Penrod, James; Dolence, Michael

    1987-01-01

    In 1985, California State University/Los Angeles changed the management of its information resources by hiring a vice president for information resources management; reorganizing existing units into an IRM organization; engaging in a detailed, integrated, participative strategic planning process; and initiating several significant projects.…

  7. Planning, Designing and Managing Higher Education Institutions

    ERIC Educational Resources Information Center

    Daigneau, William A.; Valenti, Mark S.; Ricciarini, Sylvana; Bender, Stephen O.; Alleyne, Nicole; Di Grappa, Michael; Duart, Josep M.; Lupianez, Francisco; Sanchez, Miguel Angel Ehrenzweig

    2005-01-01

    The OECD Programme on Educational Building, together with the Association of Higher Education Facilities Officers (APPA) and the OECD Programme on Institutional Management in Higher Education, organised an international conference on the planning, design and management of facilities for higher education institutions on April 24-27, 2005. The…

  8. Strategic Management or Strategic Planning for Defense?

    DTIC Science & Technology

    1989-02-01

    manage at the regional or CinC level with an appreciation of strategic planning and management concepts currently taught at business schools . Military...those not in uniform. Science, engineering, and business schools all suggest that their faculties have experience tours so that they can appreciate

  9. Graduate Student Project: Operations Management Product Plan

    ERIC Educational Resources Information Center

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  10. 77 FR 65478 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Indiana; Michigan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-29

    ... requirements are designed to ensure that the structural components of each State's air quality management... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Illinois; Indiana... Air Quality Standards; Indiana NSR/PSD AGENCY: Environmental Protection Agency (EPA). ACTION:...

  11. The Best Laid Plans: An Examination of School Plan Quality and Implementation in a School Improvement Initiative

    ERIC Educational Resources Information Center

    Strunk, Katharine O.; Marsh, Julie A.; Bush-Mecenas, Susan C.; Duque, Matthew R.

    2016-01-01

    Purpose: A common strategy used in school improvement efforts is a mandated process of formal planning, yet little is known about the quality of plans or the relationship between plan quality and implementation. This mixed-methods article investigates plan quality, factors associated with plan quality, and the relationship between plan quality and…

  12. Productivity enhancement planning using participative management concepts

    NASA Technical Reports Server (NTRS)

    White, M. E.; Kukla, J. C.

    1985-01-01

    A productivity enhancement project which used participative management for both planning and implementation is described. The process and results associated with using participative management to plan and implement a computer terminal upgrade project where the computer terminals are used by research and development (R&D) personnel are reported. The upgrade improved the productivity of R&D personnel substantially, and their commitment of the implementation is high. Successful utilization of participative management for this project has laid a foundation for continued style shift toward participation within the organization.

  13. Primary urban energy-management-planning methodology

    SciTech Connect

    Revis, Joseph; Meador, Toni

    1980-11-01

    Metropolitan Dade County, Florida, developed a pragmatic, transferable methodology to assist local governments in attempts to develop and implement energy management plans. A summary of that work is presented and suggestions are provided to guide the application and refinement of a Primary Urban Energy Management Planning Methodology. The methodology provides local governments with the systematic approach for dealing with short and intermediate-term urban energy management problems while at the same time laying the groundwork for the formulation of long-term energy management activities. The five tasks of the methodology summarized are: organizing for the PEP process; performing an energy use and supply inventory; formulating energy management goals and objectives; developing strategies to achieve the energy management objectives; and monitoring and evaluation. (MCW)

  14. Integrated Cultural Resources Management Plan

    DTIC Science & Technology

    2001-07-01

    Trachinotus sp. (pompano). Marine invertebrates are comprised of the following five species: Callinectes sapidus (Blue crab), Crassostrea virginica ...Coordinate with other MCRD components to manage cu Advise and educate other MCRD components, contracto requirements. Monitor resource condition

  15. Types of Managed Care Plans

    MedlinePlus

    ... benefits, including preventive care, for a set monthly fee. You must use the health care providers and ... a form of managed care closest to a fee-for-service situation. Doctors, hospitals, and other care ...

  16. The Role of the Quality Enhancement Plan in Engendering a Culture of Assessment

    ERIC Educational Resources Information Center

    Loughman, Thomas P.; Hickson, Joyce; Sheeks, Gina L.; Hortman, J. William

    2008-01-01

    During the past two decades, colleges and universities have used best practices from corporate management such as total quality management, strategic planning, management by objectives, benchmarking, data warehousing, and performance indicators. Many institutions of higher learning now have adopted comprehensive and multifaceted approaches to…

  17. Environmental Restoration Quality Program Implementation Plan. Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  18. Hoshin Kanri: a technique for strategic quality management.

    PubMed

    Tennant, C; Roberts, P A

    2000-01-01

    This paper describes a technique for Strategic Quality Management (SQM), known as Hoshin Kanri, which has been operated as a management system in many Japanese companies since the 1960s. It represents a core aspect of Japanese companies' management systems, and is stated as: the means by which the overall control system and Total Quality Management (TQM) are deployed. Hoshin Kanri is not particularly unique in its concept of establishing and tracking individual goals and objectives, but the manner in which the objectives and the means to achieve them are developed and deployed is. The problem with applying the concept of Strategic Quality Management (SQM) using Hoshin Kanri, is that it can tend to challenge the traditional authoritarian strategic planning models, which have become the paradigms of modern business. Yet Hoshin Kanri provides an appropriate tool for declaration of the strategic vision for the business while integrating goals and targets in a single holistic model. There have been various adaptations of Hoshin Kanri to align the technique to Western thinking and management approaches, yet outside Japan its significance has gone largely unreported. It is proposed that Hoshin Kanri is an effective methodology for SQM, which has a number of benefits over the more conventional planning techniques. The benefits of Hoshin Kanri as a tool for Strategic Quality Management (SQM) compared to conventional planning systems include: integration of strategic objectives with tactical daily management, the application of the plan-do-check-act cycle to business process management, parallel planning and execution methodology, company wide approach, improvements in communication, increased consensus and buy-in to goal setting, and cross-functional-management integration.

  19. Total Quality Management (TQM), an Overview

    DTIC Science & Technology

    1991-09-01

    TYPE AND DATES COVERED ISeptember 1991 In-Hfouse 4. TITLE AND SUBTITLE 5 . FUNDING NUMBERS TOTAL QUALITY MANAGEMENT (TQM), AN OVERVIEW PE - 62702F PR...proposed a 14 step approach to quality : 1. Management commitment 2. Quality improvement team 3. Quality measurement (defect rates) 4. Cost of quality ...evaluation 5 . Quality awareness 6. Corrective action 7. Ad hoc committee for zero defects program 8. Supervisor training 9. Zero defects day 10. Goal

  20. Air Quality Planning Unit | Ground-level Ozone | New England ...

    EPA Pesticide Factsheets

    2017-04-10

    Looking for answers about a specific air quality issue? Here's a list of topics and programs related to air quality and Air Quality Planning (AQP) staff who can answer questions and provide information about them.

  1. Air Quality Planning Unit | Ground-level Ozone | New England ...

    EPA Pesticide Factsheets

    2017-02-16

    Looking for answers about a specific air quality issue? Here's a list of topics and programs related to air quality and Air Quality Planning (AQP) staff who can answer questions and provide information about them.

  2. Managing Both Quality and Access at Higher Educational Institutions in Tobago

    ERIC Educational Resources Information Center

    Julien Sealey, Beverley

    2011-01-01

    This paper will focus on the island of Tobago and indicate what practical solutions are best suited for administrators to manage quality and access at higher educational institutions on the island. The key areas to managing quality identified are the inclusiveness of a quality plan, administrators desire to see quality as an institutional culture…

  3. Quality assurance planning for lunar Mars exploration

    NASA Technical Reports Server (NTRS)

    Myers, Kay

    1991-01-01

    A review is presented of the tools and techniques required to meet the challenge of total quality in the goal of traveling to Mars and returning to the moon. One program used by NASA to ensure the integrity of baselined requirements documents is configuration management (CM). CM is defined as an integrated management process that documents and identifies the functional and physical characteristics of a facility's systems, structures, computer software, and components. It also ensures that changes to these characteristics are properly assessed, developed, approved, implemented, verified, recorded, and incorporated into the facility's documentation. Three principal areas are discussed that will realize significant efficiencies and enhanced effectiveness, change assessment, change avoidance, and requirements management.

  4. 43 CFR 1610.1 - Resource management planning guidance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Resource management planning guidance... Resource Management Planning § 1610.1 Resource management planning guidance. (a) Guidance for preparation and amendment of resource management plans may be provided by the Director and State Director,...

  5. 43 CFR 1610.1 - Resource management planning guidance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Resource management planning guidance... Resource Management Planning § 1610.1 Resource management planning guidance. (a) Guidance for preparation and amendment of resource management plans may be provided by the Director and State Director,...

  6. Industrial Quality Standards and Total Quality Management in Higher Education.

    ERIC Educational Resources Information Center

    Tannock, James D. T.

    1991-01-01

    Examines practical applications for the suitability of two different approaches to quality management within engineering education. One utilizes quality systems standards as typified by a specific industrial process that ensures an effective production system. The other applies the notion of total quality management emphasizing a process of…

  7. [Effect of data management quality on clinical research evidence evaluation].

    PubMed

    Gao, Hong-yang; Li, Qing-na; Zhao, Yang; Li, Bo; Rui, Gao

    2015-02-01

    Current clinical evaluation of literature quality has various ways. Most of them lay special emphasis on the evaluation of the design quality, but the evaluation of the implementation process quality is not perfect. Especially data management is not fully emphasized during the enforcement of clinical trials. Data from clinical research were bases for evaluating clinical findings. Although strict specifications and requirements for data management might be strictly written clearly in research protocols, they were not embodied in current clinical research evidence evaluation system. Data management is an important part of implementing the whole clinical trial process, which is a comprehensive reflection of data collecting, logging, sorting, and managing. Its objective is to obtain high quality research data for statistical analysis, thereby coming to a true and reliable conclusion. In order to overall evaluating clinical design and implement, we suggest that present quality evaluation indicators of clinical trails should be completed, and add data management quality evaluation during the whole implement process. Data management plans, standards and requirements for data checking, and management regulations for disobeying data and exception data should be added in quality evaluation indicators for clinical research evidence. The effect of data management quality on clinical research evidence evaluation should be emphasized.

  8. Information Technology Management: Global Command and Control System Joint Operation Planning and Execution System

    DTIC Science & Technology

    2007-11-02

    Information Technology Management Department of Defense Office of the Inspector General April 15, 2003 AccountabilityIntegrityQuality Global Command...Dates Covered (from... to) - Title and Subtitle Information Technology Management : Global Command and Control System Joint Operation Planning and...September 7, 1999; “GCCS Strategic Plan 1999-2002,” December 27, 1999; “JOPES Strategic Plan,” April 2000; “ Information Technology Management Reform Act

  9. Total Quality Management in Construction

    DTIC Science & Technology

    1993-08-01

    Orviue ’E" an 1-uer price - J--U51ns L~I Figure 1 The Deming chain reaction. Deming describes the awakening of Japanese management to the positive...349Ibid. ’I•Ibid. ""’Ibid., p. 2. I 2Ibid. "ൕIbid. I4 bid. I28 acceptable."𔃺 Parsons’ measurement of quality is the price i of nonconformance or the...practice of awarding business on the basis of price tag. Instead, minimize total cost. Move toward a single supplier for any one item, on a long-term

  10. Myopia management: multihospital portfolio planning.

    PubMed

    Irish, G G

    1987-10-01

    The acquisition and divestiture of organizational business units demonstrate management's strategy in response to an evolving marketplace. From a strategic perspective, the most significant danger to a corporation is not having the "right" portfolio of businesses or products to respond to the marketplace. This article describes a conceptual model that a multihospital system executive might use to determine the growth and diversification of the organization's portfolio of businesses. The model involves the application of market, financial, and microeconomic theories in a logical sequence to assist management in making business acquisition and divestiture decisions.

  11. Air quality and future energy system planning

    NASA Astrophysics Data System (ADS)

    Sobral Mourao, Zenaida; Konadu, Dennis; Lupton, Rick

    2016-04-01

    energy system planning. Some example applications of this work are: (1) to discover conflicts and synergies between air quality regulations and future developments in the energy system and land use change; (2) to show the drivers of air quality in a given spatial context; (3) to explore effective ways to visualize impacts of different energy, land use and emissions control policies on air quality. An initial test case for the Bay Area in California will be presented, extending the scope of the existing California ForeseerTM tool to identify impacts of different policies within the water-energy-land nexus on local air quality.

  12. 77 FR 31200 - Revision to the South Coast Air Quality Management District Portion of the California State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ... AGENCY 40 CFR Part 52 Revision to the South Coast Air Quality Management District Portion of the... a State Implementation Plan (SIP) revision for the South Coast Air Quality Management District... Rulemaking for the California State Implementation Plan South Coast Air Quality Management District...

  13. A new plan quality index for nasopharyngeal cancer SIB IMRT.

    PubMed

    Jin, X; Yi, J; Zhou, Y; Yan, H; Han, C; Xie, C

    2014-02-01

    A new plan quality index integrating dosimetric and radiobiological indices was proposed to facilitate the evaluation and comparison of simultaneous integrated boost (SIB) intensity modulated radiotherapy (IMRT) plans for nasopharyngeal cancer (NPC) patients. Ten NPC patients treated by SIB-IMRT were enrolled in the study. Custom software was developed to read dose-volume histogram (DVH) curves from the treatment planning system (TPS). A plan filtering matrix was introduced to filter plans that fail to satisfy treatment protocol. Target plan quality indices and organ at risk (OAR) plan quality indices were calculated for qualified plans. A unique composite plan quality index (CPQI) was proposed based on the relative weight of these indices to evaluate and compare competing plans. Plan ranking results were compared with detailed statistical analysis, radiation oncology quality system (ROQS) scoring results and physician's evaluation results to verify the accuracy of this new plan quality index. The average CPQI values for plans with OAR priority of low, normal, high, and PTV only were 0.22 ± 0.08, 0.49 ± 0.077, 0.71 ± 0.062, and -0.21 ± 0.16, respectively. There were significant differences among these plan quality indices (One-way ANOVA test, p < 0.01). This was consistent with statistical analysis, ROQS results and physician's ranking results in which 90% OAR high plans were selected. Plan filtering matrix was able to speed up the plan evaluation process. The new matrix plan quality index CPQI showed good consistence with physician ranking results. It is a promising index for NPC SIB-IMRT plan evaluation.

  14. Quality Assurance Program Plan for the Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-03-30

    The United States Department of Energy (USDOE) has initiated the Environmental Restoration Program (ERP) in an effort to manage, control and remediate existing hazardous, toxic and radioactive wastes generated at the Portsmouth Gaseous Diffusion Plant (PORTS). This ERP Quality Assurance Program Plan (QAPP) is responsive to the PORTS ESH Division QAPP and the ES Environmental Restoration Division (ERD) QAPP. This QAPP establishes the policies, requirements and responsibilities by which an appropriate level of QA shall be implemented within the PORTS-ERP. All PORTS-ERP activities shall be conducted in accordance with the requirements of this document and/or of a project level document which is derivative of this document.

  15. 34 CFR 200.57 - Plans to increase teacher quality.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 1 2012-07-01 2012-07-01 false Plans to increase teacher quality. 200.57 Section 200... Improving Basic Programs Operated by Local Educational Agencies Qualifications of Teachers and Paraprofessionals § 200.57 Plans to increase teacher quality. (a) State plan. (1) A State that receives funds...

  16. 34 CFR 200.57 - Plans to increase teacher quality.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 1 2011-07-01 2011-07-01 false Plans to increase teacher quality. 200.57 Section 200... Improving Basic Programs Operated by Local Educational Agencies Qualifications of Teachers and Paraprofessionals § 200.57 Plans to increase teacher quality. (a) State plan. (1) A State that receives funds...

  17. 34 CFR 200.57 - Plans to increase teacher quality.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 1 2014-07-01 2014-07-01 false Plans to increase teacher quality. 200.57 Section 200... Improving Basic Programs Operated by Local Educational Agencies Qualifications of Teachers and Paraprofessionals § 200.57 Plans to increase teacher quality. (a) State plan. (1) A State that receives funds...

  18. 34 CFR 200.57 - Plans to increase teacher quality.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 1 2013-07-01 2013-07-01 false Plans to increase teacher quality. 200.57 Section 200... Improving Basic Programs Operated by Local Educational Agencies Qualifications of Teachers and Paraprofessionals § 200.57 Plans to increase teacher quality. (a) State plan. (1) A State that receives funds...

  19. The Common Pursuit: Improving the Quality of Life for Illinois Citizens with Disabilities: Implications for Restructuring the Planning and Management of State Services.

    ERIC Educational Resources Information Center

    Illinois Planning Council on Developmental Disabilities, Springfield.

    The report presents 10 brief issue papers that focus on improving Illinois state planning and administrative functions for the ultimate purpose of improving conditions for Illinois citizens with disabilities. Common themes include more active involvement of the disabled themselves and their families in the planning, delivery, and evaluation of…

  20. Hanford cultural resources management plan

    SciTech Connect

    Chatters, J.C.

    1989-06-01

    As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

  1. Data Management Facility Operations Plan

    SciTech Connect

    Keck, Nicole N

    2014-06-30

    The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.

  2. 75 FR 54031 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ...; Designation of Areas for Air Quality Planning Purposes; State of California; PM-10; Redesignation of the Coso Junction Planning Area to Attainment; Approval of PM-10 Maintenance Plan for the Coso Junction Planning... State of California's request to redesignate the Coso Junction planning area (CJPA) to attainment...

  3. Residuals Management and Water Pollution Control Planning.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Public Affairs.

    This pamphlet addresses the problems associated with residuals and water quality especially as it relates to the National Water Pollution Control Program. The types of residuals and appropriate management systems are discussed. Additionally, one section is devoted to the role of citizen participation in developing management programs. (CS)

  4. Quality Assurance Project Plan: Connecticut wetlands study

    SciTech Connect

    Sherman, A.; Gwin, S.

    1991-04-01

    EPA's Wetland Research Program has supported a major effort to study wetlands mitigation projects in the field. The field studies were designed to: (1) evaluate the project plans; (2) compare the projects with natural wetlands in the same land use setting; and (3) describe the development of the projects over time. The information from the studies will be used as technical guidance for setting performance criteria and developing design guidelines for mitigation projects. Pilot studies have been conducted in Oregon, Washington, Florida, and Connecticut. The report presents the methods and associated quality assurance procedures used during the Connecticut study. A major objective of the pilot study was to evaluate the field procedures and the data quality assessment protocols used. The authors are in the process of performing that evaluation. They anticipate that in some cases they will adopt the procedure, while others will be refined or discarded. Therefore, the authors caution the user of the document that, at this point, the EPA makes no claims or endorsement of the use of the field, laboratory, or data quality assessment procedures associated with the study.

  5. Hanford Environmental Management Program plan; Revision 1

    SciTech Connect

    DeFigh-Price, C.

    1990-08-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office. Westinghouse Hanford Company has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as regulatory reporting and planning and to facilitate compliance with environmental regulations. Key activities include preparing and/or coordinating waste management and environmental restoration site-wide planning documents, maintaining the Waste Inventory Data System, coordinating site-wide regulatory reporting (SARA Title III, Dangerous Waste Report, etc.), Tri-Party Agreement Administration and Base (nonprogram specific) regulatory permitting and National Environmental Policy Act activities. Fiscal year (FY) 1991 is the first year this activity will be directly funded. This document describes accomplishments in FY 1990, the scope of work funded by this program for FY 1991, the prioritized tasks covered, and the management structure in place. 16 refs., 4 figs., 1 tab.

  6. Leading quality through the development of a multi-year corporate quality plan: sharing The Ottawa Hospital experience.

    PubMed

    Hunter, Linda; Myles, Joanne; Worthington, James R; Lebrun, Monique

    2011-01-01

    This article discusses the background and process for developing a multi-year corporate quality plan. The Ottawa Hospital's goal is to be a top 10% performer in quality and patient safety in North America. In order to create long-term measurable and sustainable changes in the quality of patient care, The Ottawa Hospital embarked on the development of a three-year strategic corporate quality plan. This was accomplished by engaging the organization at all levels and defining quality frameworks, aligning with internal and external expectations, prioritizing strategic goals, articulating performance measurements and reporting to stakeholders while maintaining a transparent communication process. The plan was developed through an iterative process that engaged a broad base of health professionals, physicians, support staff, administration and senior management. A literature review of quality frameworks was undertaken, a Quality Plan Working Group was established, 25 key stakeholder interviews were conducted and 48 clinical and support staff consultations were held. The intent was to gather information on current quality initiatives and challenges encountered and to prioritize corporate goals and then create the quality plan. Goals were created and then prioritized through an affinity exercise. Action plans were developed for each goal and included objectives, tasks and activities, performance measures (structure, process and outcome), accountabilities and timelines. This collaborative methodology resulted in the development of a three-year quality plan. Six corporate goals were outlined by the tenets of the quality framework for The Ottawa Hospital: access to care, appropriate care (effective and efficient), safe care and satisfaction with care. Each of the six corporate goals identified objectives and supporting action plans with accountabilities outlining what would be accomplished in years one, two and three. The three-year quality plan was approved by senior

  7. 200 area liquid effluent facility quality assurance program plan. Revision 1

    SciTech Connect

    Sullivan, N.J.

    1995-10-10

    Direct revision of Supporting Document WHC-SD-LEF-QAPP-001, Rev. 0. 200 Area Liquid Effluent Facilities Quality Assurance Program Plan. Incorporates changes to references in tables. Revises test to incorporate WHC-SD-LEF-CSCM-001, Computer Software Configuration Management Plan for 200 East/West Liquid Effluent Facilities

  8. 76 FR 64017 - Approval and Promulgation of Air Quality Implementation Plans; South Carolina; Update to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; South Carolina; Update to Materials Incorporated by Reference; Correction AGENCY: Environmental Protection Agency (EPA... Development Section, Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S....

  9. Hanford site integrated pest management plan

    SciTech Connect

    Giddings, R.F.

    1996-04-09

    The Hanford Site Integrated Pest Management Plan (HSIPMP) defines the Integrated Pest Management (IPM) decision process and subsequent strategies by which pest problems are to be solved at all Hanford Site properties per DOE-RL Site Infrastructure Division memo (WHC 9505090). The HSIPMP defines the roles that contractor organizations play in supporting the IPM process. In short the IPM process anticipates and prevents pest activity and infestation by combining several strategies to achieve long-term pest control solutions.

  10. Quality assurance program plan for radionuclide airborne emissions monitoring

    SciTech Connect

    Boom, R.J.

    1995-12-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of radiological airborne emissions. This Quality Assurance Program Plan is prepared in accordance with and to written requirements.

  11. Managers and the new definition of quality.

    PubMed

    Chilgren, Allison A

    2008-01-01

    The manager, particularly the mid-level manager, has a vital role in the success of any healthcare organization, especially in the realm of patient perception of quality. To patients, "quality" means how well a service was delivered, not how technically superior the actual service or clinical component turned out. This definition of quality can also be referred to as patient satisfaction. Managers, with help of an integrative team, can develop quality processes geared toward patient expectations by doing a number of things, including the following: clearly identify outcomes, and empower employees to achieve those goals; form an integrated quality development team to establish quality metrics; build in cultural competence into quality processes; and align the organization's mission to the overall quality program. With a successful quality program, managers can expect a considerable return on investment, satisfied patients and staff, and improved clinical outcomes.

  12. 43 CFR 1610.5-1 - Resource management plan approval and administrative review.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.5-1 Resource management plan approval...

  13. 43 CFR 1610.5 - Resource management plan approval, use and modification.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.5 Resource management plan approval, use and modification....

  14. Quality Assurance Project Plan for Citizen Science Projects

    EPA Pesticide Factsheets

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  15. Asset management planning and RCM

    SciTech Connect

    Anders, G.J.; Endrenyi, J.; Vainberg, M.

    1996-08-01

    Electric power utilities have always employed preventive maintenance programs to keep their equipment in good working condition for as long as economic. At this time when system extensions are heavily constrained and the purchase of new and better equipment may not be feasible either, the role of preventive maintenance is particularly significant. Thus, a good preventive maintenance program has become an important part of what is often called asset management The purpose of preventive maintenance is to extend equipment lifetime, or at least the mean time to the next break-down. Clearly, too little maintenance may have very costly consequences. On the other hand, preventive maintenance has a price, too, and it may not be economical to do it too frequently. In a cost-effective scheme, the two expenditures must be balanced. In the past, achieving this balance has often been a trial and error process. Now there is an analytical tool to help determine the best maintenance policies.

  16. Hanford emergency management plan - release 15

    SciTech Connect

    CARPENTER, G.A.

    1999-07-19

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety.

  17. Los Alamos National Laboratory transuranic waste quality assurance project plan. Revision 1

    SciTech Connect

    1997-04-14

    This Transuranic (TRU) Waste Quality Assurance Project Plan (QAPjP) serves as the quality management plan for the characterization of transuranic waste in preparation for certification and transportation. The Transuranic Waste Characterization/Certification Program (TWCP) consists of personnel who sample and analyze waste, validate and report data; and provide project management, quality assurance, audit and assessment, and records management support, all in accordance with established requirements for disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP) facility. This QAPjP addresses how the TWCP meets the quality requirements of the Carlsbad Area Office (CAO) Quality Assurance Program Description (QAPD) and the technical requirements of the Transuranic Waste Characterization Quality Assurance Program Plan (QAPP). The TWCP characterizes and certifies retrievably stored and newly generated TRU waste using the waste selection, testing, sampling, and analytical techniques and data quality objectives (DQOs) described in the QAPP, the Los Alamos National Laboratory Transuranic Waste Certification Plan (Certification Plan), and the CST Waste Management Facilities Waste Acceptance Criteria and Certification [Los Alamos National Laboratory (LANL) Waste Acceptance Criteria (WAC)]. At the present, the TWCP does not address remote-handled (RH) waste.

  18. Environmental Restoration Quality Program Plan. Environmental Restoration Program

    SciTech Connect

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a ``entral Environmental Restoration Division`` to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization`s objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  19. Strategic plan for Hanford Site Environmental Restoration Information Management

    SciTech Connect

    Cowley, P.J.; Beck, J.E.; Gephart, R.E.

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site`s soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site`s production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user`s needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach.

  20. Noncoplanar VMAT for nasopharyngeal tumors: Plan quality versus treatment time

    SciTech Connect

    Wild, Esther Bangert, Mark; Nill, Simeon; Oelfke, Uwe

    2015-05-15

    Purpose: The authors investigated the potential of optimized noncoplanar irradiation trajectories for volumetric modulated arc therapy (VMAT) treatments of nasopharyngeal patients and studied the trade-off between treatment plan quality and delivery time in radiation therapy. Methods: For three nasopharyngeal patients, the authors generated treatment plans for nine different delivery scenarios using dedicated optimization methods. They compared these scenarios according to dose characteristics, number of beam directions, and estimated delivery times. In particular, the authors generated the following treatment plans: (1) a 4π plan, which is a not sequenced, fluence optimized plan that uses beam directions from approximately 1400 noncoplanar directions and marks a theoretical upper limit of the treatment plan quality, (2) a coplanar 2π plan with 72 coplanar beam directions as pendant to the noncoplanar 4π plan, (3) a coplanar VMAT plan, (4) a coplanar step and shoot (SnS) plan, (5) a beam angle optimized (BAO) coplanar SnS IMRT plan, (6) a noncoplanar BAO SnS plan, (7) a VMAT plan with rotated treatment couch, (8) a noncoplanar VMAT plan with an optimized great circle around the patient, and (9) a noncoplanar BAO VMAT plan with an arbitrary trajectory around the patient. Results: VMAT using optimized noncoplanar irradiation trajectories reduced the mean and maximum doses in organs at risk compared to coplanar VMAT plans by 19% on average while the target coverage remains constant. A coplanar BAO SnS plan was superior to coplanar SnS or VMAT; however, noncoplanar plans like a noncoplanar BAO SnS plan or noncoplanar VMAT yielded a better plan quality than the best coplanar 2π plan. The treatment plan quality of VMAT plans depended on the length of the trajectory. The delivery times of noncoplanar VMAT plans were estimated to be 6.5 min in average; 1.6 min longer than a coplanar plan but on average 2.8 min faster than a noncoplanar SnS plan with comparable

  1. Improved Planning Time and Plan Quality Through Multicriteria Optimization for Intensity-Modulated Radiotherapy

    SciTech Connect

    Craft, David L.; Hong, Theodore S.; Shih, Helen A.; Bortfeld, Thomas R.

    2012-01-01

    Purpose: To test whether multicriteria optimization (MCO) can reduce treatment planning time and improve plan quality in intensity-modulated radiotherapy (IMRT). Methods and Materials: Ten IMRT patients (5 with glioblastoma and 5 with locally advanced pancreatic cancers) were logged during the standard treatment planning procedure currently in use at Massachusetts General Hospital (MGH). Planning durations and other relevant planning information were recorded. In parallel, the patients were planned using an MCO planning system, and similar planning time data were collected. The patients were treated with the standard plan, but each MCO plan was also approved by the physicians. Plans were then blindly reviewed 3 weeks after planning by the treating physician. Results: In all cases, the treatment planning time was vastly shorter for the MCO planning (average MCO treatment planning time was 12 min; average standard planning time was 135 min). The physician involvement time in the planning process increased from an average of 4.8 min for the standard process to 8.6 min for the MCO process. In all cases, the MCO plan was blindly identified as the superior plan. Conclusions: This provides the first concrete evidence that MCO-based planning is superior in terms of both planning efficiency and dose distribution quality compared with the current trial and error-based IMRT planning approach.

  2. Delivering quality pain management: the challenge for nurses.

    PubMed

    Hayes, Kim; Gordon, Debra B

    2015-03-01

    The delivery of high-quality pain management in the perioperative environment can be challenging and difficult to quantify. Commonly used tools in delivering care, such as pain intensity ratings, individual pain experience reporting, assessments of individual patients' expectations, and patient satisfaction scores, have limitations and are not always useful when addressing quality improvement measures. Despite clinical advances in pain management, patients continue to experience inadequate pain control and inconsistent pain management practices. In this article, we discuss the challenges in providing consistent quality pain management, the need for a coordinated plan of care with a goal of meeting desired pain outcomes, and the essential role that perianesthesia and perioperative nurses play throughout the transitions in perioperative care to promote optimal pain management interventions based on the patient's individual needs.

  3. Managing the shift to a productivity and quality culture

    SciTech Connect

    Mallak, L.A.; Kurstedt, H.A. Jr.; Welch, K.A.; Geller, E.S.; Kurstedt, P.S.

    1991-01-01

    Managers can exploit the similarities of culture management and efforts to improve productivity and quality because they both rely on values and traditions. Both are continuous, valve-driven processes requiring daily monitoring and evaluation. And both demand strong effective leadership and commitment from all employees. We must shift from organizations that strive for productivity and quality in their final products and services to organizations that value productivity and quality as part of their culture and build these into their processes. Organizations need to adopt the values and traditions surrounding good productivity and quality so productivity and quality become the norm--the core supporting daily decisions. A strong, supportive culture guides decision making at lower levels in the organization by clearly communicating the expectations. Work can then proceed with fewer interruptions, with workers becoming empowered, and with managers having more time to manage. We offer several approaches and techniques for achieving a productivity and quality culture. They are (1) continuously improve productivity and quality, (2) build productivity and quality into your culture, (3) collect culture change evidence, (4) link your efforts to a comprehensive plan, and (5) build strong, effective leadership. Consistent application of these approaches and techniques will help managers forge new cultures that value productivity and quality and work for continuous improvement. 8 refs.

  4. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  5. Ocean Thermal Energy Conversion Program Management Plan

    SciTech Connect

    Combs, R E

    1980-01-01

    The Office of the Associate Laboratory Director for Energy and Environmental Technology has established the OTEC Program Management Office to be responsible for the ANL-assigned tasks of the OTEC Program under DOE's Chicago Operations and Regional Office (DOE/CORO). The ANL OTEC Program Management Plan is essentially a management-by-objective plan. The principal objective of the program is to provide lead technical support to CORO in its capacity as manager of the DOE power-system program. The Argonne OTEC Program is divided into three components: the first deals with development of heat exchangers and other components of OTEC power systems, the second with development of biofouling counter-measures and corrosion-resistant materials for these components in seawater service, and the third with environmental and climatic impacts of OTEC power-system operation. The essential points of the Management Plan are summarized, and the OTEC Program is described. The organization of the OTEC Program at ANL is described including the functions, responsibilities, and authorities of the organizational groupings. The system and policies necessary for the support and control functions within the organization are discussed. These functions cross organizational lines, in that they are common to all of the organization groups. Also included are requirements for internal and external reports.

  6. The eighth NASA total quality management accomplishments report, 1990

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The eighth annual accomplishments report provides numerous examples of quality strategies that have proven effective and efficient in a time when cost reduction is critical. NASA's continuous improvement efforts can provide insight for others to succeed in their own endeavors. The report covers: top management leadership and support, strategic planning, focus on the customer, employee training and recognition, employee empowerment and teamwork, measurement and analysis, and quality assurance.

  7. Quality Assurance Program Plan for AGR Fuel Development and Qualification Program

    SciTech Connect

    W. Ken Sowder

    2004-02-01

    Quality Assurance Plan (QPP) is to document the Idaho National Engineering and Environmental Laboratory (INEEL) Management and Operating (M&O) Contractor’s quality assurance program for AGR Fuel Development and Qualification activities, which is under the control of the INEEL. The QPP is an integral part of the Gen IV Program Execution Plan (PEP) and establishes the set of management controls for those systems, structures and components (SSCs) and related quality affecting activities, necessary to provide adequate confidence that items will perform satisfactorily in service.

  8. 40 CFR 52.1395 - Smoke management plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Smoke management plan. 52.1395 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1395 Smoke management plan. The Department considers smoke management techniques for agriculture and forestry management burning purposes...

  9. 40 CFR 52.1395 - Smoke management plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Smoke management plan. 52.1395 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1395 Smoke management plan. The Department considers smoke management techniques for agriculture and forestry management burning purposes...

  10. Quality improvement in neurology: dementia management quality measures.

    PubMed

    Odenheimer, Germaine; Borson, Soo; Sanders, Amy E; Swain-Eng, Rebecca J; Kyomen, Helen H; Tierney, Samantha; Gitlin, Laura; Forciea, Mary Ann; Absher, John; Shega, Joseph; Johnson, Jerry

    2014-03-01

    Professional and advocacy organizations have long urged that dementia should be recognized and properly diagnosed. With the passage of the National Alzheimer's Project Act in 2011, an Advisory Council for Alzheimer's Research, Care, and Services was convened to advise the Department of Health and Human Services. In May 2012, the Council produced the first National Plan to address Alzheimer's disease, and prominent in its recommendations is a call for quality measures suitable for evaluating and tracking dementia care in clinical settings. Although other efforts have been made to set dementia care quality standards, such as those pioneered by RAND in its series Assessing Care of Vulnerable Elders (ACOVE), practitioners, healthcare systems, and insurers have not widely embraced implementation. This executive summary (full manuscript available at www.neurology.org) reports on a new measurement set for dementia management developed by an interdisciplinary Dementia Measures Work Group (DWG) representing the major national organizations and advocacy organizations concerned with the care of individuals with dementia. The American Academy of Neurology (AAN), the American Geriatrics Society, the American Medical Directors Association, the American Psychiatric Association, and the American Medical Association-convened Physician Consortium for Performance Improvement led this effort. The ACOVE measures and the measurement set described here apply to individuals whose dementia has already been identified and properly diagnosed. Although similar in concept to ACOVE, the DWG measurement set differs in several important ways; it includes all stages of dementia in a single measure set, calls for the use of functional staging in planning care, prompts the use of validated instruments in patient and caregiver assessment and intervention, highlights the relevance of using palliative care concepts to guide care before the advanced stages of illness, and provides evidence-based support

  11. Guidelines for preparing a quality assurance plan for district offices of the U.S. Geological Survey

    USGS Publications Warehouse

    Schroder, L.J.; Shampine, W.J.

    1992-01-01

    The U.S. Geological Survey has a policy that requires each District office to prepare a Quality Assurance Plan. This plan is a combination of a District's management principles and quality assurance processes. The guidelines presented in this report provide a framework or expanded outline that a District can use to prepare a plan. Parti- cular emphasis is given to a District's: (1) quality assurance policies; (2) organization and staff responsibilities; and (3) program and project planning. The guidelines address the 'how', 'what', and 'who' questions that need to be answered when a District Quality Assurance Plan is prepared.

  12. Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan : ASC software quality engineering practices Version 3.0.

    SciTech Connect

    Turgeon, Jennifer L.; Minana, Molly A.; Hackney, Patricia; Pilch, Martin M.

    2009-01-01

    The purpose of the Sandia National Laboratories (SNL) Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. Quality is defined in the US Department of Energy/National Nuclear Security Agency (DOE/NNSA) Quality Criteria, Revision 10 (QC-1) as 'conformance to customer requirements and expectations'. This quality plan defines the SNL ASC Program software quality engineering (SQE) practices and provides a mapping of these practices to the SNL Corporate Process Requirement (CPR) 001.3.6; 'Corporate Software Engineering Excellence'. This plan also identifies ASC management's and the software project teams responsibilities in implementing the software quality practices and in assessing progress towards achieving their software quality goals. This SNL ASC Software Quality Plan establishes the signatories commitments to improving software products by applying cost-effective SQE practices. This plan enumerates the SQE practices that comprise the development of SNL ASC's software products and explains the project teams opportunities for tailoring and implementing the practices.

  13. Guidelines for Planning in Colleges and Universities. Volume Two, Management and Financial Planning.

    ERIC Educational Resources Information Center

    Pinnell, Charles; Wacholder, Michael

    This volume presents techniques and details involved in developing the management and program planning and the financial planning phases of a total planning system. Also discussed is a suggested organization for implementing a planning system. Areas emphasized under management and program planning are (1) institutional objectives, (2) planning…

  14. Summary of strategies for planning Productivity Improvement and Quality Enhancement (PIQE)

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The Summary of NASA Strategies for Productivity Improvement and Quality Enhancement respond to NASA's eighth top goal: Establish NASA as a leader in the development and application of advanced technology and management practices which contribute to significant increases in both Agency and national productivity. The Strategies provide the framework for development of the agency-wide Productivity Improvement and Quality Enhancement (PIQE) Plans.

  15. 78 FR 58460 - Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control District and Feather River Air Quality Management District; Stationary Source Permits... California as a revision to the Placer County Air Pollution Control District (PCAPCD) and Feather River...

  16. Nevada Test Site Resource Management Plan

    SciTech Connect

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  17. Total Quality Management in the Defense Fuel Supply Center: Issues and Observations.

    ERIC Educational Resources Information Center

    Matysek, Eugene F., Jr.

    1993-01-01

    Examines the Total Quality Management (TQM) activities at a federal government agency (i.e., the Defense Fuel Supply Center) using the following criteria established by the Federal Quality Institute: top management leadership and support; strategic quality planning; customer focus; training and recognition; employee empowerment and teamwork; and…

  18. AVLIS Production Plant Project Management Plan

    SciTech Connect

    Not Available

    1984-11-15

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  19. Water Quality Assessment and Management

    EPA Pesticide Factsheets

    Overview of Clean Water Act (CWA) restoration framework including; water quality standards, monitoring/assessment, reporting water quality status, TMDL development, TMDL implementation (point & nonpoint source control)

  20. Quality Management Systems Implementation Compared With Organizational Maturity in Hospital

    PubMed Central

    Moradi, Tayebeh; Jafari, Mehdi; Maleki, Mohammad Reza; Naghdi, Seyran; Ghiyasvand, Hesam

    2016-01-01

    Background: A quality management system can provide a framework for continuous improvement in order to increase the probability of customers and other stakeholders’ satisfaction. The test maturity model helps organizations to assess the degree of maturity in implementing effective and sustained quality management systems; plan based on the current realities of the organization and prioritize their improvement programs. Objectives: We aim to investigate and compare the level of organizational maturity in hospitals with the status of quality management systems implementation. Materials and Methods: This analytical cross sectional study was conducted among hospital administrators and quality experts working in hospitals with over 200 beds located in Tehran. In the first step, 32 hospitals were selected and then 96 employees working in the selected hospitals were studied. The data were gathered using the implementation checklist of quality management systems and the organization maturity questionnaire derived from ISO 10014. The content validity was calculated using Lawshe method and the reliability was estimated using test - retest method and calculation of Cronbach's alpha coefficient. The descriptive and inferential statistics were used to analyze the data using SPSS 18 software. Results: According to the table, the mean score of organizational maturity among hospitals in the first stage of quality management systems implementation was equal to those in the third stage and hypothesis was rejected (p-value = 0.093). In general, there is no significant difference in the organizational maturity between the first and third level hospitals (in terms of implementation of quality management systems). Conclusions: Overall, the findings of the study show that there is no significant difference in the organizational maturity between the hospitals in different levels of the quality management systems implementation and in fact, the maturity of the organizations cannot be

  1. Wildlife management, surface mining, and regional planning

    SciTech Connect

    Nieman, T.J.; Merkin, Z.R.

    1995-12-31

    Wildlife management, surface mining, and regional planning historically have had conflicting missions. The cooperative public/private venture which created the Robinson Forest and Cyprus-Amax Wildlife Management Areas is presented as an example of how a regional perspective encourages a symbiotic relationship among these functions. Wildlife management areas, as either an interim or final land use, are shown to incorporate development concepts which benefit the general public, the coal industry, and the environment. Examining the regional pattern of wildlife management areas and refuges confirms the appropriateness of the subject site for this use. It is suggested that the pattern of mined lands can be studied to identify other sites with potential to provide linkages between a wildlife habitat areas and encourage reclamation of such sites to the {open_quotes}fish and wildlife{close_quotes} postmining land use. Such reclamation strategies should be pursued within a long-term planning framework. More research is needed to recreate specific habitat types on drastically disturbed land and planning is needed to assure that sensitive habitats or species are located away from zones likely to undergo future development. Use of geographic information systems to integrate existing environmental information could make such studies more effective. 14 refs., 7 figs.

  2. Total quality management in orthodontic practice.

    PubMed

    Atta, A E

    1999-12-01

    Quality is the buzz word for the new Millennium. Patients demand it, and we must serve it. Yet one must identify it. Quality is not imaging or public relations; it is a business process. This short article presents quality as a balance of three critical notions: core clinical competence, perceived values that our patients seek and want, and the cost of quality. Customer satisfaction is a variable that must be identified for each practice. In my practice, patients perceive quality as communication and time, be it treatment or waiting time. Time is a value and cost that must be managed effectively. Total quality management is a business function; it involves diagnosis, design, implementation, and measurement of the process, the people, and the service. Kazien is a function that reduces value services, eliminates waste, and manages time and cost in the process. Total quality management is a total commitment for continuous improvement.

  3. Quality management: does it pay off?

    PubMed

    van den Heuvel, Jaap; Bogers, Ad J J C; Does, Ronald J M M; van Dijk, Sandra L; Berg, Marc

    2006-01-01

    Health care today is facing serious quality problems while costs are exploding. Quality management therefore becomes a major strategic challenge. In this article, we go through the strategy deployment and quality management process of the Red Cross Hospital in the Netherlands. Growth, efficiency improvement, and optimizing quality of care were chosen as our main strategic goals. To enable achievement of these goals, we implemented and integrated an ISO 9001:2000 quality management system with Six Sigma, a quality improvement approach from industry. The results of 5 years of quality management illustrated by the scores of a number of performance indicators clearly show that we were able to achieve all our strategic goals. On the basis of our findings, we believe that the combination of ISO 9000 and Six Sigma provides the proper tools to bring health care organizations to a higher level of performance.

  4. 48 CFR 37.604 - Quality assurance surveillance plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Quality assurance... SPECIAL CATEGORIES OF CONTRACTING SERVICE CONTRACTING Performance-Based Acquisition 37.604 Quality assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance...

  5. 76 FR 54251 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are... Management Plans (Criteria). For the purpose of this announcement, Water Management Plans (Plans)...

  6. Development of a multiple objective planning theory and system for sustainable air quality monitoring networks.

    PubMed

    Chen, Ching-Ho; Liu, Wei-Lin; Chen, Chia-Hsing

    2006-01-15

    Air quality monitoring data are important bases for air quality management strategies planning and performance assessment. Therefore, the environmental protection authorities need to plan the air quality monitoring network effectively. However, in Taiwan, the national Environmental Protection Administration (EPA) and some county environmental protection bureaus (EPB) separately installed their own monitoring stations. This study developed an integrated methodology and computer system for planning air quality monitoring networks. The environmental, social, and economic objectives and sub-objectives, and their weights were identified using system analysis and multiple objective planning, based on the principles of sustainable development. A multiple objective optimization model and procedure for sustainable air quality monitoring networks planning are developed in this study. According to the procedure, a multiple objective planning system for sustainable air quality monitoring networks (MOPSSAQMN) is developed using computer software based on the modified bounded implicit enumeration algorithm with the constraint arrangement method. The air quality monitoring network of Taoyuan County, in northern Taiwan, was used as a case study to demonstrate the proposed method. Two satisfactory alternatives based on different conditions were generated using MOPSSAQMN. The compared results show that this study generated better alternatives than the current monitoring network. An installation schedule for the alternative was proposed, and its first step is now being implemented by the EPB of Taoyuan County Government. The procedure and computer system developed in this study can be used to assist the competent authorities to devise good and different alternatives for air quality monitoring networks planning.

  7. 78 FR 70012 - Lake Tahoe Basin Management Unit, California, Land Management Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... Forest Service Lake Tahoe Basin Management Unit, California, Land Management Plan Revision AGENCY: Lake... Management Unit (LTBMU) Land Management Plan Revision available for the 60-day pre-decisional objection... Record of Decision for the Lake Tahoe Basin Management Unit (LTBMU) Land Management Plan...

  8. 78 FR 65751 - Integrated Corridor Management Deployment Planning Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... Federal Highway Administration Integrated Corridor Management Deployment Planning Grants AGENCY: Federal... continue Integrated Corridor Management (ICM) development with their partners, such as arterial management.... The purpose of this program is to promote the integrated management and operations of...

  9. A methodology model for quality management in a general hospital.

    PubMed

    Stern, Z; Naveh, E

    1997-01-01

    A reappraisal is made of the relevance of industrial modes of quality management to the issues of medical care. Analysis of the nature of medical care, which differentiates it from the supplier-client relationships of industry, presents the main intrinsic characteristics, which create problems in application of the industrial quality management approaches to medical care. Several examples are the complexity of the relationship between the medical action and the result obtained, the client's nonacceptance of economic profitability as a value in his medical care, and customer satisfaction biased by variable standards of knowledge. The real problems unique to hospitals are addressed, and a methodology model for their quality management is offered. Included is a sample of indicator vectors, measurements of quality care, cost of medical care, quality of service, and human resources. These are based on the trilogy of planning quality, quality control, and improving quality. The conclusions confirm the inadequacy of industrial quality management approaches for medical institutions and recommend investment in formulation of appropriate concepts.

  10. 77 FR 38267 - Information Collection; Request for Comment; Objections to New Land Management Plans, Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ... Forest Service Information Collection; Request for Comment; Objections to New Land Management Plans, Plan Amendments, and Plan Revisions AGENCY: Forest Service, USDA. ACTION: Notice. ] SUMMARY: Under the Paperwork... plans, plan amendments, and plan revisions. DATES: Comments must be received in writing on or...

  11. Web Application Software for Ground Operations Planning Database (GOPDb) Management

    NASA Technical Reports Server (NTRS)

    Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey

    2013-01-01

    A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.

  12. Quality improvement and quality management: Complementary or contradictory

    SciTech Connect

    Calhoun, M.B. )

    1993-09-01

    Quality improvement processes (QIP's) and quality management systems (QMS's) are becoming part of manufacturing and service company language. In some cases, there are perceived differences between the concepts of continuous improvement and documented systems to ensure quality. The author has seen examples of QIP's and QMS's working in a complementary fashion to improve existing manufacturing and administrative processes. These examples show that quality improvement activities are compatible with and can enhance the effectiveness of QMS's if the two are integrated properly.

  13. Guide to Developing an Environmental Management System - Plan

    EPA Pesticide Factsheets

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Plan section.

  14. 40 CFR 64.8 - Quality improvement plan (QIP) requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Quality improvement plan (QIP... PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.8 Quality improvement plan (QIP) requirements. (a... higher or lower percent or may rely on other criteria for purposes of indicating whether a...

  15. 40 CFR 64.8 - Quality improvement plan (QIP) requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Quality improvement plan (QIP) requirements. 64.8 Section 64.8 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.8 Quality improvement plan (QIP) requirements....

  16. 40 CFR 64.8 - Quality improvement plan (QIP) requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Quality improvement plan (QIP) requirements. 64.8 Section 64.8 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.8 Quality improvement plan (QIP) requirements....

  17. Operational Environmental Monitoring Program Quality Assurance Project Plan

    SciTech Connect

    Perkins, C.J.

    1994-08-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and operational environmental monitoring performed by Westinghouse Hanford Company as it implements the Operational Environmental Monitoring program. This plan applies to all sampling and monitoring activities performed by Westinghouse Hanford Company in implementing the Operational Environmental Monitoring program at the Hanford Site.

  18. 40 CFR 64.8 - Quality improvement plan (QIP) requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Quality improvement plan (QIP... PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.8 Quality improvement plan (QIP) requirements. (a... evaluating the control performance problems and, based on the results of the evaluation procedures, the...

  19. A Menu of Options for Developing Tribal Air Grant Work Plans and Managing Grants for Environmental Results

    EPA Pesticide Factsheets

    Tool to assist tribes that apply for Clean Air Act (CAA) funding to draft more effective work plans for projects that will develop tribal knowledge of air quality issues and build tribal expertise to manage air quality on tribal lands.

  20. Managing Change from a Quality Perspective.

    ERIC Educational Resources Information Center

    Snyder, Karolyn J.

    This paper presents findings of a study that examined the change process in 28 schools, with a focus on how principals went about transforming traditional school-work cultures into quality systems. The principals had participated in Managing Productive Schools (MPS), a comprehensive systems-approach program based on quality management concepts.…

  1. Application of Total Quality Management in Education

    ERIC Educational Resources Information Center

    Farooq, M. S.; Akhtar, M. S.; Ullah, S. Zia; Memon, R. A.

    2007-01-01

    The purpose of the paper is to analyzing thoughts of the modern management paradigm "Total Quality Management" (TQM), and its application in the field of education. The basic theme of TQM is participatory approach to address the question(s) of quality in business aswell as in the field of education. Reviewing fresh literature from the internet …

  2. Site action plan for maintenance management program. Revision D

    SciTech Connect

    Pearson, A.W.

    1993-11-30

    (DOE) Order 4330.4B, ``Maintenance Management Program`` requires each site to develop a Site Action Plan for implementing a Maintenance Management Program. Nonnuclear facilities are required to address the 32 elements of Chapter 1: Guidelines for the Conduct of Maintenance at DOE Nonnuclear Facilities. This document details the degree of implementation for each element, and the Martin Marietta Specialty Components, Inc., plan for implementation of the items which remain to be completed. The original Pinellas Plant Maintenance Management Program Site Action Plan (Issue A) was completed March 27, 1991. The format was modified per DOE request and it was resubmitted as Issue B and approved by AL September 16, 1991. Issue C was submitted, and approved December 20, 1992. The most significant achievement during FY-93 were the implementation of plant wide Graded Approach, and Configuration Control programs. The methodologies for performing these activities were developed, and pilot programs were implemented to verify their effectiveness. Plant wide implementation of both programs is progressing on a high priority basis. The formalized method for grading equipment and facilities provides a basis for establishing uniform, risk based priorities. The risks involved are environment, safety, health and programmatic mission. Other achievements for FY-93, include the establishment of procedures for the decommissioning, and down-grading of facilities, improved work control, improved work performance reporting, improved quality plans, and improved operating procedures.

  3. Remote sensing for land management and planning

    NASA Astrophysics Data System (ADS)

    Woodcock, Curtis E.; Strahler, Alan H.; Franklin, Janet

    1983-05-01

    The primary role of remote sensing in land management and planning has been to provide information concerning the physical characteristics of the land which influence the management of individual land parcels or the allocation of lands to various uses These physical characteristics have typically been assessed through aerial photography, which is used to develop resource maps and to monitor changing environmental conditions These uses are well developed and currently well integrated into the planning infrastructure at local, state, and federal levels in the United States. Many newly emerging uses of remote sensing involve digital images which are collected, stored, and processed automatically by electromechanical scanning devices and electronic computers Some scanning devices operate from aircraft or spacecraft to scan ground scenes directly; others scan conventional aerial transparencies to yield digital images. Digital imagery offers the potential for computer-based automated map production, a process that can significantly increase the amount and timeliness of information available to land managers and planners. Future uses of remote sensing in land planning and management will involve geographic information systems, which store resource information in a geocoded format. Geographic information systems allow the automated integration of disparate types of resource data through various types of spatial models so that with accompanying sample ground data, information in the form of thematic maps and/ or aerially aggregated statistics can be produced Key issues confronting the development and integration of geographic information systems into planning pathways are restoration and rectification of digital images, automated techniques for combining both quantitative and qualitative types of data in information-extracting procedures, and the compatibility of alternative data storage modes

  4. Strategic Mobility 21 Project Management Plan

    DTIC Science & Technology

    2006-09-29

    UNCLASSIFIED Strategic Mobility 21 Project Management Plan Contractor Report 0004 Prepared for: Office of Naval Research 875 North...98) REPORT DOCUMENTATION PAGE Prescribed by ANSI Std. Z39.18 Form Approved OMB No. 0704-0188 The public reporting burden for this collection of...Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should

  5. River Protection Project (RPP) Project Management Plan

    SciTech Connect

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  6. 76 FR 53149 - North American Waterfowl Management Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-25

    ... Fish and Wildlife Service North American Waterfowl Management Plan AGENCY: Fish and Wildlife Service... Wildlife Service, announce the availability of the draft North American Waterfowl Management Plan Revision (draft Plan Revision) for public review. We request review and comment on the draft Plan Revision...

  7. [Quality and safety management for radiotherapy].

    PubMed

    Pourel, N; Meyrieux, C; Perrin, B

    2016-09-01

    Quality and safety management have been implemented for many years in healthcare structures (hospitals treating cancer, private radiotherapy centres). Their structure and formalization have improved progressively over time. These recommendations aim at describing the link between quality and safety management through its organization scheme based on quality-safety policy, process approach, document management and quality measurement. Dedicated tools, such as experience feedback, a priori risk mapping, to-do-lists and check-lists are shown as examples and recommended as routine practice.

  8. [Costs and benefits of quality management].

    PubMed

    Schroeder-Printzen, I

    2014-01-01

    The establishment of quality management (QM) has been mandatory for health care providers of the national health insurance since 2004; however, certification is so far only compulsory for rehabilitation clinics. The costs have so far only been quantified in a few medical studies, while they are widely known in business administration with a basic distinction made between planning, steering, auditing, and declaration costs. Another business economics approach differentiates between prevention, appraisal, and non-conformance costs. The benefits of QM relates to customers, employees, external service providers, and health insurance providers. Also important in our consideration of the patient as a customer is that they should not be considered a customer in the usual business sense because the patient is in an emergency situation and can not freely decide. Improvements in treatment quality and in reducing the rate of adverse events make up the largest portion of the benefits of QM. Furthermore, QM can have a positive influence on motivation and employee recruitment. In addition, the cost savings that result despite costs for QM must not be forgotten.

  9. MO-B-BRB-02: Maintain the Quality of Treatment Planning for Time-Constraint Cases

    SciTech Connect

    Chang, J.

    2015-06-15

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  10. 77 FR 16447 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... Quality Planning Purposes; State of California; Ozone; Nitrogen Dioxide; Technical Amendments AGENCY... classifications of certain areas in California for the 1971 annual nitrogen dioxide standard and the 1997...

  11. Assessing the quality of cost management

    SciTech Connect

    Fayne, V.; McAllister, A.; Weiner, S.B.

    1995-12-31

    Managing environmental programs can be effective only when good cost and cost-related management practices are developed and implemented. The Department of Energy`s Office of Environmental Management (EM), recognizing this key role of cost management, initiated several cost and cost-related management activities including the Cost Quality Management (CQM) Program. The CQM Program includes an assessment activity, Cost Quality Management Assessments (CQMAs), and a technical assistance effort to improve program/project cost effectiveness. CQMAs provide a tool for establishing a baseline of cost-management practices and for measuring improvement in those practices. The result of the CQMA program is an organization that has an increasing cost-consciousness, improved cost-management skills and abilities, and a commitment to respond to the public`s concerns for both a safe environment and prudent budget outlays. The CQMA program is part of the foundation of quality management practices in DOE. The CQMA process has contributed to better cost and cost-related management practices by providing measurements and feedback; defining the components of a quality cost-management system; and helping sites develop/improve specific cost-management techniques and methods.

  12. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  13. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  14. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  15. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  16. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  17. 25 CFR 700.721 - Range management plans.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 2 2011-04-01 2011-04-01 false Range management plans. 700.721 Section 700.721 Indians... Lands Grazing § 700.721 Range management plans. The Commissioner (or his designee) and the permittees of each range unit will meet as a group and develop a Range Management Plan for the common use of...

  18. 25 CFR 700.721 - Range management plans.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false Range management plans. 700.721 Section 700.721 Indians... Lands Grazing § 700.721 Range management plans. The Commissioner (or his designee) and the permittees of each range unit will meet as a group and develop a Range Management Plan for the common use of...

  19. 25 CFR 161.203 - Are range management plans required?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Are range management plans required? 161.203 Section 161... LANDS GRAZING PERMITS General Provisions § 161.203 Are range management plans required? Yes. BIA will... range restoration activities for the Navajo Partitioned Lands. (b) Develop range management plans...

  20. 25 CFR 161.203 - Are range management plans required?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Are range management plans required? 161.203 Section 161... LANDS GRAZING PERMITS General Provisions § 161.203 Are range management plans required? Yes. BIA will... range restoration activities for the Navajo Partitioned Lands. (b) Develop range management plans...

  1. 25 CFR 161.203 - Are range management plans required?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Are range management plans required? 161.203 Section 161... LANDS GRAZING PERMITS General Provisions § 161.203 Are range management plans required? Yes. BIA will... range restoration activities for the Navajo Partitioned Lands. (b) Develop range management plans...

  2. 25 CFR 700.721 - Range management plans.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 2 2012-04-01 2012-04-01 false Range management plans. 700.721 Section 700.721 Indians... Lands Grazing § 700.721 Range management plans. The Commissioner (or his designee) and the permittees of each range unit will meet as a group and develop a Range Management Plan for the common use of...

  3. 25 CFR 161.203 - Are range management plans required?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Are range management plans required? 161.203 Section 161... LANDS GRAZING PERMITS General Provisions § 161.203 Are range management plans required? Yes. BIA will... range restoration activities for the Navajo Partitioned Lands. (b) Develop range management plans...

  4. 25 CFR 700.721 - Range management plans.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 2 2014-04-01 2014-04-01 false Range management plans. 700.721 Section 700.721 Indians... Lands Grazing § 700.721 Range management plans. The Commissioner (or his designee) and the permittees of each range unit will meet as a group and develop a Range Management Plan for the common use of...

  5. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and...

  6. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and...

  7. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Resource management planning process. 1610.4 Section 1610.4 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF... Resource Management Planning § 1610.4 Resource management planning process....

  8. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Resource management planning process. 1610.4 Section 1610.4 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF... Resource Management Planning § 1610.4 Resource management planning process....

  9. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Resource management planning process. 1610.4 Section 1610.4 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF... Resource Management Planning § 1610.4 Resource management planning process....

  10. 78 FR 13316 - National Forest System Land Management Planning Directives

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ... Forest Service RIN 0596-AD06 National Forest System Land Management Planning Directives AGENCY: Forest...) land management planning regulation. Issuance of these proposed directives will provide consistent... land management plans for units of the NFS. Public comment is invited and will be considered...

  11. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and...

  12. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and...

  13. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and...

  14. Total Quality Management: A Selected Bibliography

    DTIC Science & Technology

    1993-03-01

    pp. 35-38. Perine, James L . "The Quest for Quality." ( Mission of the Federal Quality Institute) BUREAUCRAT, Vol. 19, Summer 1990, pp. 47-48. Reynolds...ELECTRONICS, Vol. 24, January 1992, pp. 49-52. Calfee, David L . "Get Your Mission Statement Working!" MANAGEMENT REVIEW, Vol. 82, January 1993, pp. 54...AD-A262 902 Total Quality Management A Selected Bibliography ......... 3APP4 , The United States, as an industrialized nation, has no choice about

  15. Evaluating Quality Management in University Departments

    ERIC Educational Resources Information Center

    Becket, Nina; Brookes, Maureen

    2006-01-01

    Purpose: Despite the abundance of research on quality management there is no universal consensus on how best to measure quality in higher education. This paper undertakes a critical evaluation of the different methods used to assess the quality of provision in higher education departments in the UK. Design/methodology/approach: Drawing on relevant…

  16. Role of strategic planning in engineering management

    NASA Technical Reports Server (NTRS)

    Krishen, Kumar

    1993-01-01

    Today, more than ever before, engineers are faced with uncertain and sometimes chaotic environments in which to function. The traditional roles of an engineer to design, develop, and streamline a manufacturing process for a product are still valued and relevant. However, the need for an engineer to participate in the process of identifying the product to be developed, the schedule and resources required, and the goal of satisfying the customer, has become paramount to achieving the success of the enterprise. When we include these endeavors in the functions of an engineer, management of 'engineering' takes on a new dimension. In this paper, the ramifications of the changing and increased functions of an engineer and consequent impacts on engineering management are explored. The basic principles which should be invoked in order to embrace the new environment for engineering management are outlined. The ultimate finding of this study is that the enterprise strategic plan should be developed in such a way as to allow engineering management to encompass the full spectrum of the responsibilities of engineers. A consequence of this is that the fundamental elements of the strategic process can best be implemented through a project team or group approach. The paper thus concentrates on three areas: evolving environment, strategic plan, and ways to achieve enterprise success.

  17. Total quality management in blood transfusion.

    PubMed

    Smit-Sibinga, C T

    2000-01-01

    Quality management is an ongoing development resulting in consistency products and services and ever increasing customer satisfaction. The ultimum is Total Quality Management. Quality systems and quality management in transfusion medicine have gained considerable attention since the outbreak of the AIDS epidemic. Where product orientation has long been applied through quality control, Good Manufacturing Practice (GMP) principles were introduced, shifting the developments in the direction of process orientation. Globally, and particularly in the more industrialised world people and system orientation has come along with the introduction of the ISO9001 concept. Harmonisation and a degree of uniformity are needed to implement a universally applicable Quality System and related Quality Management. Where the American Association of Blood Banks (AABB) is the professional organisation with the most extensive experience in quality systems in blood transfusion, the European Union and the Council of Europe now are in the process to design a quality system and management applicable to a larger variety of countries, based on a hybrid of current GMP and ISO9001 principles. The International Federation of Red Cross and Red Crescent Societies has developed a more universally to implement Quality Manual, with a pilot project in Honduras. It is recommendable to harmonise the various designs and bring the approaches under one common denominator.

  18. Quality assurance plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Not Available

    1994-01-01

    This Quality Assurance Plan (QAP) is concerned with design and construction (Sect. 2) and characterization and monitoring (Sect. 3). The basis for Sect. 2 is the Quality Assurance Plan for the Design and Construction of Waste Area Grouping 6 Closure at Oak Ridge National Laboratory, Oak Ridge, Tennessee, and the basis for Sect. 3 is the Environmental Restoration Quality Program Plan. Combining the two areas into one plan gives a single, overall document that explains the requirements and from which the individual QAPs and quality assurance project plans can be written. The Waste Area Grouping (WAG) 6 QAP establishes the procedures and requirements to be implemented for control of quality-related activities for the WAG 6 project. Quality Assurance (QA) activities are subject to requirements detailed in the Martin Marietta Energy Systems, Inc. (Energy Systems), QA Program and the Environmental Restoration (ER) QA Program, as well as to other quality requirements. These activities may be performed by Energy Systems organizations, subcontractors to Energy Systems, and architect-engineer (A-E) under prime contract to the US Department of Energy (DOE), or a construction manager under prime contract to DOE. This plan specifies the overall Energy Systems quality requirements for the project. The WAG 6 QAP will be supplemented by subproject QAPs that will identify additional requirements pertaining to each subproject.

  19. Planning and management of cloud computing networks

    NASA Astrophysics Data System (ADS)

    Larumbe, Federico

    The evolution of the Internet has a great impact on a big part of the population. People use it to communicate, query information, receive news, work, and as entertainment. Its extraordinary usefulness as a communication media made the number of applications and technological resources explode. However, that network expansion comes at the cost of an important power consumption. If the power consumption of telecommunication networks and data centers is considered as the power consumption of a country, it would rank at the 5 th place in the world. Furthermore, the number of servers in the world is expected to grow by a factor of 10 between 2013 and 2020. This context motivates us to study techniques and methods to allocate cloud computing resources in an optimal way with respect to cost, quality of service (QoS), power consumption, and environmental impact. The results we obtained from our test cases show that besides minimizing capital expenditures (CAPEX) and operational expenditures (OPEX), the response time can be reduced up to 6 times, power consumption by 30%, and CO2 emissions by a factor of 60. Cloud computing provides dynamic access to IT resources as a service. In this paradigm, programs are executed in servers connected to the Internet that users access from their computers and mobile devices. The first advantage of this architecture is to reduce the time of application deployment and interoperability, because a new user only needs a web browser and does not need to install software on local computers with specific operating systems. Second, applications and information are available from everywhere and with any device with an Internet access. Also, servers and IT resources can be dynamically allocated depending on the number of users and workload, a feature called elasticity. This thesis studies the resource management of cloud computing networks and is divided in three main stages. We start by analyzing the planning of cloud computing networks to get a

  20. 75 FR 65594 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY... consolidation of Ohio's Ambient Air Quality Standards (AAQS) into Ohio's State Implementation Plan (SIP)...