Veit, Christof; Bungard, Sven; Hertle, Dagmar; Grothaus, Franz-Josef; Kötting, Joachim; Arnold, Nicolai
2013-01-01
Alongside the projects of internal quality management and mandatory quality assurance there is a variety of quality driven projects across institutions initiated and run by various partners to continuously improve the quality of care. The multiplicity and characteristics of these projects are discussed on the basis of projects run by the BQS Institute between 2010 and 2013. In addition, useful interactions and linking with mandatory quality benchmarking and with internal quality management are discussed. (As supplied by publisher). Copyright © 2013. Published by Elsevier GmbH.
Ford, Bradley A.; Klutts, J. Stacey; Jensen, Chris S.; Briggs, Angela S.; Robinson, Robert A.; Bruch, Leslie A.; Karandikar, Nitin J.
2017-01-01
Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output. PMID:28913416
Krasowski, Matthew D; Ford, Bradley A; Klutts, J Stacey; Jensen, Chris S; Briggs, Angela S; Robinson, Robert A; Bruch, Leslie A; Karandikar, Nitin J
2017-01-01
Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output.
Fiehe, Sandra; Wagner, Georg; Schlanstein, Peter; Rosefort, Christiane; Kopp, Rüdger; Bensberg, Ralf; Knipp, Peter; Schmitz-Rode, Thomas; Steinseifer, Ulrich; Arens, Jutta
2014-04-01
The ultimate objective of university research and development projects is usually to create knowledge, but also to successfully transfer results to industry for subsequent marketing. We hypothesized that the university technology transfer requires efficient measures to improve this important step. Besides good scientific practice, foresighted and industry-specific adapted documentation of research processes in terms of a quality management system might improve the technology transfer. In order to bridge the gap between research institute and cooperating industry, a model project has been accompanied by a project specific amount of quality management. However, such a system had to remain manageable and must not constrain the researchers' creativity. Moreover, topics and research team are strongly interdisciplinary, which entails difficulties regarding communication because of different perspectives and terminology. In parallel to the technical work of the model project, an adaptable quality management system with a quality manual, defined procedures, and forms and documents accompanying the research, development and validation was implemented. After process acquisition and analysis the appropriate amount of management for the model project was identified by a self-developed rating system considering project characteristics like size, innovation, stakeholders, interdisciplinarity, etc. Employees were trained according to their needs. The management was supported and the technical documentation was optimized. Finally, the quality management system has been transferred successfully to further projects.
Quality of Project Management Education and Training Programmes
NASA Astrophysics Data System (ADS)
Bodea, Constanta-Nicoleta; Dascalu, Maria; Coman, Melania
The paper refers to the factors which influence the quality of training and education on project management. A survey was made and the main results are presented. 81 % of the responses came from China. The rest were professionals of different EU nationalities. The percentage of Project Managers who answered the questions is rather low - 8%. In the "Others" category, we have software developers, financial managers and professors, who are involved in both training on project management, but also as team members or team managers in projects, thus ensuring a balanced overview of both theory and practical issues.
33 CFR 385.21 - Quality control.
Code of Federal Regulations, 2014 CFR
2014-07-01
... will be produced by a Project Delivery Team. The quality control plan shall be included in the Project Management Plan and shall describe the procedures to be used to ensure compliance with technical and policy requirements during implementation. (b) During development of the Project Management Plan for each project, the...
NASA Technical Reports Server (NTRS)
Falke, Stefan; Husar, Rudolf
2011-01-01
The goal of this REASoN applications and technology project is to deliver and use Earth Science Enterprise (ESE) data and tools in support of air quality management. Its scope falls within the domain of air quality management and aims to develop a federated air quality information sharing network that includes data from NASA, EPA, US States and others. Project goals were achieved through a access of satellite and ground observation data, web services information technology, interoperability standards, and air quality community collaboration. In contributing to a network of NASA ESE data in support of particulate air quality management, the project will develop access to distributed data, build Web infrastructure, and create tools for data processing and analysis. The key technologies used in the project include emerging web services for developing self describing and modular data access and processing tools, and service oriented architecture for chaining web services together to assemble customized air quality management applications. The technology and tools required for this project were developed within DataFed.net, a shared infrastructure that supports collaborative atmospheric data sharing and processing web services. Much of the collaboration was facilitated through community interactions through the Federation of Earth Science Information Partners (ESIP) Air Quality Workgroup. The main activities during the project that successfully advanced DataFed, enabled air quality applications and established community-oriented infrastructures were: develop access to distributed data (surface and satellite), build Web infrastructure to support data access, processing and analysis create tools for data processing and analysis foster air quality community collaboration and interoperability.
Hayes, R; Bratzler, D; Armour, B; Moore, L; Murray, C; Stevens, B R; Radford, M; Fitzgerald, D; Elward, K; Ballard, D J
2001-03-01
A multistate randomized study conducted under the Health Care Financing Administration's (HCFA's) Health Care Quality Improvement Program (HCQIP) offered the opportunity to compare the effect of a written feedback intervention (WFI) with that of an enhanced feedback intervention (EFI) on improving the anticoagulant management of Medicare beneficiaries who present to the hospital with venous thromboembolic disease. Twenty-nine hospitals in five states were randomly assigned to receive written hospital-specific feedback (WFI) of feedback enhanced by the participation of a trained physician, quality improvement tools, and an Anticoagulant Management of Venous Thrombosis (AMVT) project liaison (EFI). Differences in the performance of five quality indicators between baseline and remeasurement were assessed. Quality managers were interviewed to determine perceptions of project implementation. No significant differences in the change from baseline to remeasurement were found between the two intervention groups. Significant improvement in one indicator and significant decline in two indicators were found for one or both groups. Yet 59% of all quality managers perceived the AMVT project as being successful to very successful, and more EFI quality managers perceived success than did WFI managers (71% versus 40%). In the majority of EFI hospitals, physician liaisons played an important role in project implementation. Study results indicated that the addition of a physician liaison, quality improvement tools, and a project liaison did not provide incremental value to hospital-specific feedback for improving quality of care. Future studies with larger sample sizes, lengthier follow-up periods, and interventions that include more of the elements shown to affect practice behavior change are needed to identify an optimal feedback model for use by external quality management organizations.
NHEXAS PHASE I MARYLAND STUDY--QUALITY SYSTEMS AND IMPLEMENTATION PLAN (HSPH QSIP)
This document describes the project design and quality systems used by the Maryland Study for NHEXAS Phase 1. It contains the following sections: Project Planning and Organization, Project Implementation Plan, Data Acquisition and Management, Records Usage and Management, Routin...
This regulation prescribes Chemical Data Quality Management (CDQM) responsibilities and procedures for projects involving hazardous, toxic and/or radioactive waste (HTRW) materials. Its purpose is to assure that the analytical data meet project data quality objectives. This is the umbrella regulation that defines CDQM activities and integrates all of the other U.S. Army Corps of Engineers (USACE) guidance on environmental data quality management .
The NCC project: A quality management perspective
NASA Technical Reports Server (NTRS)
Lee, Raymond H.
1993-01-01
The Network Control Center (NCC) Project introduced the concept of total quality management (TQM) in mid-1990. The CSC project team established a program which focused on continuous process improvement in software development methodology and consistent deliveries of high quality software products for the NCC. The vision of the TQM program was to produce error free software. Specific goals were established to allow continuing assessment of the progress toward meeting the overall quality objectives. The total quality environment, now a part of the NCC Project culture, has become the foundation for continuous process improvement and has resulted in the consistent delivery of quality software products over the last three years.
A residency clinic chronic condition management quality improvement project.
Halverson, Larry W; Sontheimer, Dan; Duvall, Sharon
2007-02-01
Quality improvement in chronic disease management is a major agenda for improving health and reducing health care costs. A six-component chronic disease management model can help guide this effort. Several characteristics of the "new model" of family medicine described by the Future of Family Medicine (FFM) Project Leadership Committee are promulgated to foster practice changes that improve quality. Our objective was to implement and assess a quality improvement project guided by the components of a chronic disease management model and FFM new model characteristics. Diabetes was selected as a model chronic disease focus. Multiple practice changes were implemented. A mature electronic medical record facilitated data collection and measurement of quality improvement progress. Data from the diabetes registry demonstrates that our efforts have been effective. Significant improvement occurred in five out of six quality indicators. Multidisciplinary teamwork in a model residency practice guided by chronic disease management principles and the FFM new model characteristics can produce significant management improvements in one important chronic disease.
Workplace Factors That Shape Information Technology Project Success
ERIC Educational Resources Information Center
Nguyen, Dan Schilling
2013-01-01
Information technology (IT) project success depends on having a project manager with effective decision making, leadership, and project management skills. Project success also depends on completing the project in a given budget, time, and scope. Despite these critical qualities of a successful project manager, little research has explored the…
40 CFR 35.2015 - State priority system and project priority list.
Code of Federal Regulations, 2010 CFR
2010-07-01
... achieve optimum water quality management consistent with the goals and requirements of the Act. All..., needs and priorities set forth in areawide water quality management plans, and any other factors... priority to projects in priority water quality areas. The priority system may also include the...
Ace Project as a Project Management Tool
ERIC Educational Resources Information Center
Cline, Melinda; Guynes, Carl S.; Simard, Karine
2010-01-01
The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…
ERIC Educational Resources Information Center
Pansiri, Nkobi Owen
2008-01-01
A descriptive study using questionnaires was conducted in 2004 to assess the effectiveness of instructional leadership displayed by primary school management teams following the implementation of the Primary School Management Project in Botswana. Leadership skills, Coordination of instructional activities, management of curriculum and quality of…
Principles and Practices for Quality Assurance and Quality Control
Jones, Berwyn E.
1999-01-01
Quality assurance and quality control are vital parts of highway runoff water-quality monitoring projects. To be effective, project quality assurance must address all aspects of the project, including project management responsibilities and resources, data quality objectives, sampling and analysis plans, data-collection protocols, data quality-control plans, data-assessment procedures and requirements, and project outputs. Quality control ensures that the data quality objectives are achieved as planned. The historical development and current state of the art of quality assurance and quality control concepts described in this report can be applied to evaluation of data from prior projects.
Zeng, Wenfeng; Tan, Qiang; Wu, Shihua; Deng, Yingcong; Liu, Lifen; Wang, Zhi; Liu, Yimin
2015-12-01
To investigate the application of risk grading and classification for occupational hazards in risk management for a shipbuilding project. The risk management for this shipbuilding project was performed by a comprehensive application of MES evaluation, quality assessment of occupational health management, and risk grading and classification for occupational hazards, through the methods of occupational health survey, occupational health testing, and occupational health examinations. The results of MES evaluation showed that the risk of occupational hazards in this project was grade 3, which was considered as significant risk; Q value calculated by quality assessment of occupational health management was 0.52, which was considered to be unqualified; the comprehensive evaluation with these two methods showed that the integrated risk rating for this shipbuilding project was class D, and follow- up and rectification were needed with a focus on the improvement in health management. The application of MES evaluation and quality assessment of occupational health management in risk management for occupational hazards can achieve objective and reasonable conclusions and has good applicability.
EPA Guidance for Geospatially Related Quality Assurance Project Plans
This March 2003 document discusses EPA's Quality Assurance (QA) Project Plan as a tool for project managers and planners to document the type and quality of data and information needed for making environmental decisions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-10
... Information Collection: Comment Request; Form HUD-9834 Management Review for Multifamily Housing Projects... (CAs) to evaluate the quality of project management; determine the causes of project problems; devise... Management Review for Multifamily Housing Projects. Estimation of the total numbers of hours needed to...
NASA Astrophysics Data System (ADS)
Preradović, D. M.; Mićić, Lj S.; Barz, C.
2017-05-01
Production conditions in today’s world require software support at every stage of production and development of new products, for quality assurance and compliance with ISO standards. In addition to ISO standards such as usual metrics of quality, companies today are focused on other optional standards, such as CMMI (Capability Maturity Model Integrated) or prescribing they own standards. However, while there is intensive progress being made in the PM (project management), there is still a significant number of projects, at the global level, that are failures. These have failed to achieve their goals, within budget or timeframe. This paper focuses on checking the role of software tools through the rate of success in projects implemented in the case of internationally manufactured electrical equipment. The results of this research show the level of contribution of the project management software used to manage and develop new products to improve PM processes and PM functions, and how selection of the software tools affects the quality of PM processes and successfully completed projects.
USDA/Regional Dairy Quality Management Alliance (RDQM) Project-2008 Report
USDA-ARS?s Scientific Manuscript database
The Regional Dairy Quality Management Alliance (RDQMA) research project has been underway for four years. We have so far been able to study best management practices on three dairy farms in the Northeast. ON these farms very precise data are collected with regard to the health status of the animals ...
USDA-ARS?s Scientific Manuscript database
Best management practices (BMPs) have been widely used to address hydrology and water quality issues in both agricultural and urban areas. Increasing numbers of BMPs have been studied in research projects and implemented in watershed management projects, but a gap remains in quantifying their effect...
Algorithm for evaluating the effectiveness of a high-rise development project based on current yield
NASA Astrophysics Data System (ADS)
Soboleva, Elena
2018-03-01
The article is aimed at the issues of operational evaluation of development project efficiency in high-rise construction under the current economic conditions in Russia. The author touches the following issues: problems of implementing development projects, the influence of the operational evaluation quality of high-rise construction projects on general efficiency, assessing the influence of the project's external environment on the effectiveness of project activities under crisis conditions and the quality of project management. The article proposes the algorithm and the methodological approach to the quality management of the developer project efficiency based on operational evaluation of the current yield efficiency. The methodology for calculating the current efficiency of a development project for high-rise construction has been updated.
Quality Management Framework for Total Diet Study centres in Europe.
Pité, Marina; Pinchen, Hannah; Castanheira, Isabel; Oliveira, Luisa; Roe, Mark; Ruprich, Jiri; Rehurkova, Irena; Sirot, Veronique; Papadopoulos, Alexandra; Gunnlaugsdóttir, Helga; Reykdal, Ólafur; Lindtner, Oliver; Ritvanen, Tiina; Finglas, Paul
2018-02-01
A Quality Management Framework to improve quality and harmonization of Total Diet Study practices in Europe was developed within the TDS-Exposure Project. Seventeen processes were identified and hazards, Critical Control Points and associated preventive and corrective measures described. The Total Diet Study process was summarized in a flowchart divided into planning and practical (sample collection, preparation and analysis; risk assessment analysis and publication) phases. Standard Operating Procedures were developed and implemented in pilot studies in five organizations. The flowchart was used to develop a quality framework for Total Diet Studies that could be included in formal quality management systems. Pilot studies operated by four project partners were visited by project assessors who reviewed implementation of the proposed framework and identified areas that could be improved. The quality framework developed can be the starting point for any Total Diet Study centre and can be used within existing formal quality management approaches. Copyright © 2017 Elsevier Ltd. All rights reserved.
ERIC Educational Resources Information Center
Corbitt, Brian
1998-01-01
Describes two action research projects undertaken at an Australian university to improve quality of services to foreign students and improve the institution's image through word of mouth, or informal marketing. Each project, although small, facilitated changes or improvements to a targeted service. The role of management in empowering employees…
Managing the Quality of Environmental Data in EPA Region 9
EPA Pacific Southwest, Region 9's Quality Assurance (QA) section's primary mission is to effectively oversee and carry out the Quality System and Quality Management Plan, and project-level quality assurance and quality control (QA/QC) activities.
40 CFR 35.925-2 - Water quality management plans and agencies.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of the...
40 CFR 35.2102 - Water quality management planning.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management plan...
76 FR 41192 - Mines Management Inc. Montanore Project, Kootenai National Forest, Lincoln County, MT
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-13
... DEPARTMENT OF AGRICULTURE Forest Service Mines Management Inc. Montanore Project, Kootenai... can be reviewed at: http://www.fs.fed.usda.gov/goto/kootenai/projects . Mines Management Inc. owns two... of Environmental Quality, issued a Draft Environmental Impact Statement for the Montanore Project. In...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).
2004-07-01
sampler, project manager, data reviewer, statistician , risk assessor, assessment personnel, and laboratory QC manager. In addition, a complete copy of...sample • Corrective actions to be taken if the QC sample fails these criteria • A description of how the QC data and results are to be documented and...Intergovernmental Data Quality Task Force Uniform Federal Policy for Quality Assurance Project Plans Evaluating, Assessing, and Documenting
Project officer's perspective: quality assurance as a management tool.
Heiby, J
1993-06-01
Advances in the management of health programs in less developed countries (LDC) have not kept pace with the progress of the technology used. The US Agency for International Development mandated the Quality Assurance Project (QAP) to provide quality improvement technical assistance to primary health care systems in LDCs while developing appropriate quality assurance (QA) strategies. The quality of health care in recent years in the US and Europe focused on the introduction of management techniques developed for industry into health systems. The experience of the QAP and its predecessor, the PRICOR Project, shows that quality improvement techniques facilitate measurement of quality of care. A recently developed WHO model for the management of the sick child provides scientifically based standards for actual care. Since 1988, outside investigators measuring how LDC clinicians perform have revealed serious deficiencies in quality compared with the program's own standards. This prompted developed of new QA management initiatives: 1) communicating standards clearly to the program staff; 2) actively monitoring actual performance corresponds to these standards; and 3) taking action to improve performance. QA means that managers are expected to monitor service delivery, undertake problem solving, and set specific targets for quality improvement. Quality improvement methods strengthen supervision as supervisors can objectively assess health worker performance. QA strengthens the management functions that support service delivery, e.g., training, records management, finance, logistics, and supervision. Attention to quality can contribute to improved health worker motivation and effective incentive programs by recognition for a job well done and opportunities for learning new skills. These standards can also address patient satisfaction. QA challenges managers to aim for the optimal level of care attainable.
[QUIPS: quality improvement in postoperative pain management].
Meissner, Winfried
2011-01-01
Despite the availability of high-quality guidelines and advanced pain management techniques acute postoperative pain management is still far from being satisfactory. The QUIPS (Quality Improvement in Postoperative Pain Management) project aims to improve treatment quality by means of standardised data acquisition, analysis of quality and process indicators, and feedback and benchmarking. During a pilot phase funded by the German Ministry of Health (BMG), a total of 12,389 data sets were collected from six participating hospitals. Outcome improved in four of the six hospitals. Process indicators, such as routine pain documentation, were only poorly correlated with outcomes. To date, more than 130 German hospitals use QUIPS as a routine quality management tool. An EC-funded parallel project disseminates the concept internationally. QUIPS demonstrates that patient-reported outcomes in postoperative pain management can be benchmarked in routine clinical practice. Quality improvement initiatives should use outcome instead of structural and process parameters. The concept is transferable to other fields of medicine. Copyright © 2011. Published by Elsevier GmbH.
40 CFR 35.2102 - Water quality management planning.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan being...
40 CFR 35.2102 - Water quality management planning.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan being...
[Practical implementation of a quality management system in a radiological department].
Huber, S; Zech, C J
2011-10-01
This article describes the architecture of a project aiming to implement a DIN EN ISO 9001 quality management system in a radiological department. It is intended to be a practical guide to demonstrate each step of the project leading to certification of the system. In a planning phase resources for the implementation of the project have to be identified and a quality management (QM) group as core team has to be formed. In the first project phase all available documents have to be checked and compiled in the QM manual. Moreover all relevant processes of the department have to be described in so-called process descriptions. In a second step responsibilities for the project are identified. Customer and employee surveys have to be carried out and a nonconformity management system has to be implemented. In this phase internal audits are also needed to check the new QM system, which is finally tested in the external certification audit with reference to its conformity with the standards.
NASA Technical Reports Server (NTRS)
Hayhurst, Kelly J. (Editor)
2008-01-01
The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes configuration management and quality assurance documents from the GCS project. Volume 4 contains six appendices: A. Software Accomplishment Summary for the Guidance and Control Software Project; B. Software Configuration Index for the Guidance and Control Software Project; C. Configuration Management Records for the Guidance and Control Software Project; D. Software Quality Assurance Records for the Guidance and Control Software Project; E. Problem Report for the Pluto Implementation of the Guidance and Control Software Project; and F. Support Documentation Change Reports for the Guidance and Control Software Project.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY OFFICE OF ENVIRONMENTAL QUALITY MANAGEMENT FUND § 1518.3 Policy. (a) All studies and projects financed through the OEQ Management Fund shall be... Quality Improvement Act. (b) Agency funds accepted by the Director for transfer into the OEQ Management...
Lightning Mapper Sensor Lens Assembly S.O. 5459: Project Management Plan
NASA Technical Reports Server (NTRS)
Zeidler, Janet
1999-01-01
Kaiser Electro-Optics, Inc. (KEO) has developed this Project Management Plan for the Lightning Mapper Sensor (LMS) program. KEO has integrated a team of experts in a structured program management organization to meet the needs of the LMS program. The project plan discusses KEO's approach to critical program elements including Program Management, Quality Assurance, Configuration Management, and Schedule.
NASA Technical Reports Server (NTRS)
Schramm, Harry F.; Sullivan, Kenneth W.
1991-01-01
An evaluation of the NASA's Marshall Space Flight Center (MSFC) strategy to implement Total Quality Management (TQM) in the Advanced Solid Rocket Motor (ASRM) Project is presented. The evaluation of the implementation strategy reflected the Civil Service personnel perspective at the project level. The external and internal environments at MSFC were analyzed for their effects on the ASRM TQM strategy. Organizational forms, cultures, management systems, problem solving techniques, and training were assessed for their influence on the implementation strategy. The influence of ASRM's effort was assessed relative to its impact on mature projects as well as future projects at MSFC.
Mohammadi, S Mehrdad; Mohammadi, S Farzad; Hedges, Jerris R; Zohrabi, Morteza; Ameli, Omid
2007-08-01
Reports addressing continuous quality improvement (CQI) methods in developing countries are scant and there are questions about the applicability of quality improvement methods in such settings. The structure and output of a formal quality improvement program implemented in a teaching hospital affiliated with the Tehran University of Medical Sciences is presented. OBJECTIVE METHOD: During a nine-month period, a multi-stage quality improvement program was implemented. It comprised: (i) training workshops; (ii) a steering committee; (iii) weekly consultation and facilitation of improvement projects; and (iv) a day-long demonstration and recognition meeting. Four cycles of workshops were held in which 132 employees were trained in the basics of CQI. Thirty improvement projects were initiated. Twenty-five of the projects were completed. In an evaluation survey more than 70% of respondents assessed a 'positive impact' on organizational culture, work efficiency and quality of services. More than 90% believed that the changes were sustained, and more than 60% reported that they have implemented additional improvement projects. Our quality improvement package supported rapid implementation of multiple projects. The underlying 'change structure' comprised the improvement teams, top management and the university's quality improvement office; it integrated project management, support and facilitation functions by the respective participant. Organization-wide change was more limited than anticipated. To institutionalize the program and ensure sustainability, a local structure for change should be organized, management coaching should be sustained, local facilitators should be developed, incentives should be established and physician involvement should be emphasized.
7 CFR 634.1 - Purpose and scope.
Code of Federal Regulations, 2011 CFR
2011-01-01
... best management practices (BMP's) in project areas which have critical water quality problems resulting... approved agricultural portion of a 208 water quality management plan. Participation in RCWP is voluntary. (c) The program is a new USDA program and an extension of existing water-quality management programs...
7 CFR 634.1 - Purpose and scope.
Code of Federal Regulations, 2010 CFR
2010-01-01
... best management practices (BMP's) in project areas which have critical water quality problems resulting... approved agricultural portion of a 208 water quality management plan. Participation in RCWP is voluntary. (c) The program is a new USDA program and an extension of existing water-quality management programs...
7 CFR 634.13 - Project applications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... State or areawide 208 water quality management plan. (c) Applications shall contain the following... water-quality management agency designated by the Governor to carry out the approved agricultural portion of the 208 water quality management plan for the area or source certifying that the BMPs to be...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY OFFICE OF ENVIRONMENTAL QUALITY MANAGEMENT FUND... Council on Environmental Quality to the OEQ Management Fund for a joint study or project shall be... financed and supported by the OEQ Management Fund. (2) The charter must clearly state the relation of the...
7 CFR 634.13 - Project applications.
Code of Federal Regulations, 2011 CFR
2011-01-01
... State or areawide 208 water quality management plan. (c) Applications shall contain the following... water-quality management agency designated by the Governor to carry out the approved agricultural portion of the 208 water quality management plan for the area or source certifying that the BMPs to be...
NASA Astrophysics Data System (ADS)
Murali, Swetha; Ponmalar, V.
2017-07-01
To make innovation and continuous improvement as a norm, some traditional practices must become unlearnt. Change for growth and competitiveness are required for sustainability for any profitable business such as the construction industry. The leading companies are willing to implement Total Quality Management (TQM) principles, to realise potential advantages and improve growth and efficiency. Ironically, researches recollected quality as the most significant provider for competitive advantage in industrial leadership. The two objectives of this paper are 1) Identify TQM effectiveness in residential projects and 2) Identify the client satisfaction/dissatisfaction areas using Analytical Hierarchy Process (AHP) and suggest effective mitigate measures. Using statistical survey techniques like set of questionnaire survey, it is observed that total quality management was applied in some leading successful organization to an extent. The main attributes for quality achievement can be defined as teamwork and better communication with single agreed goal between client and contractor. Onsite safety is a paramount attribute in the identifying quality within the residential projects. It was noticed that the process based quality methods such as onsite safe working condition; safe management system and modern engineering process safety controls etc. as interlinked functions. Training and effective communication with all stakeholders on quality management principles is essential for effective quality work. Late Only through effective TQM principles companies can avoid some contract litigations with an increased client satisfaction Index.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurancemore » requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.« less
Leading the Quality Management of Online Learning Environments in Australian Higher Education
ERIC Educational Resources Information Center
Holt, Dale; Palmer, Stuart; Munro, Judy; Solomonides, Ian; Gosper, Maree; Hicks, Margaret; Sankey, Michael; Allan, Garry; Hollenbeck, Robert
2013-01-01
The paper presents the findings of the first year of a nationally funded Australian Learning and Teaching Council (ALTC) project on the quality management of online learning environments by and through distributed leadership. The project is being undertaken by five Australian universities with major commitments to online and distance education.…
NASA Technical Reports Server (NTRS)
1979-01-01
Contents: project plan summary; project and mission objectives; related studies and technology support activities; technical summary; management; procurement approach; project definition items and schedule; resources; management review; controlled items; and safety, reliability, and quality assurance.
Total quality management in American industry.
Widtfeldt, A K; Widtfeldt, J R
1992-07-01
The definition of total quality management is conformance to customer requirements and specifications, fitness for use, buyer satisfaction, and value at an affordable price. The three individuals who have developed the total quality management concepts in the United States are W.E. Deming, J.M. Juran, and Philip Crosby. The universal principles of total quality management are (a) a customer focus, (b) management commitment, (c) training, (d) process capability and control, and (e) measurement through quality improvement tools. Results from the National Demonstration Project on Quality Improvement in Health Care showed the principles of total quality management could be applied to healthcare.
Preventing Stalled Quality Improvement Teams: A Written Test of Project Selectionability.
ERIC Educational Resources Information Center
Bacdayan, Paul
2002-01-01
Discusses organizations' use of quality improvement teams in total quality management and how they can benefit from training team personnel in how to select projects with a low risk of stalling. Describes an efficient written assessment test of project selection ability designed for those who conduct evaluations of training sessions. (Author/LRW)
Projecting manpower to attain quality
NASA Technical Reports Server (NTRS)
Rone, K. Y.
1983-01-01
The resulting model is useful as a projection tool but must be validated in order to be used as an on-going software cost engineering tool. A procedure is developed to facilitate the tracking of model projections and actual data to allow the model to be tuned. Finally, since the model must be used in an environment of overlapping development activities on a progression of software elements in development and maintenance, a manpower allocation model is developed for use in a steady state development/maintenance environment. In these days of soaring software costs it becomes increasingly important to properly manage a software development project. One element of the management task is the projection and tracking of manpower required to perform the task. In addition, since the total cost of the task is directly related to the initial quality built into the software, it becomes a necessity to project the development manpower in a way to attain that quality. An approach to projecting and tracking manpower with quality in mind is described.
Leong, Tiong Kung; Zakuan, Norhayati; Mat Saman, Muhamad Zameri; Ariff, Mohd Shoki Md; Tan, Choy Soon
2014-01-01
This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings.
Leong, Tiong Kung; Ariff, Mohd. Shoki Md.
2014-01-01
This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings. PMID:24701182
Oblinger, Carolyn J.
2004-01-01
The Triangle Area Water Supply Monitoring Project was initiated in October 1988 to provide long-term water-quality data for six area water-supply reservoirs and their tributaries. In addition, the project provides data that can be used to determine the effectiveness of large-scale changes in water-resource management practices, document differences in water quality among water-supply types (large multiuse reservoir, small reservoir, run-of-river), and tributary-loading and in-lake data for water-quality modeling of Falls and Jordan Lakes. By September 2001, the project had progressed in four phases and included as many as 34 sites (in 1991). Most sites were sampled and analyzed by the U.S. Geological Survey. Some sites were already a part of the North Carolina Division of Water Quality statewide ambient water-quality monitoring network and were sampled by the Division of Water Quality. The network has provided data on streamflow, physical properties, and concentrations of nutrients, major ions, metals, trace elements, chlorophyll, total organic carbon, suspended sediment, and selected synthetic organic compounds. Project quality-assurance activities include written procedures for sample collection, record management and archive, collection of field quality-control samples (blank samples and replicate samples), and monitoring the quality of field supplies. In addition to project quality-assurance activities, the quality of laboratory analyses was assessed through laboratory quality-assurance practices and an independent laboratory quality-control assessment provided by the U.S. Geological Survey Branch of Quality Systems through the Blind Inorganic Sample Project and the Organic Blind Sample Project.
40 CFR 35.2102 - Water quality management planning.
Code of Federal Regulations, 2011 CFR
2011-07-01
... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality management planning. Before grant assistance can be awarded for any treatment works project, the Regional... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management planning. 35...
Zhang, Yonghong; Sun, Weihong; Gutchell, Emily M; Kvecher, Leonid; Kohr, Joni; Bekhash, Anthony; Shriver, Craig D; Liebman, Michael N; Mural, Richard J; Hu, Hai
2013-01-01
In clinical and translational research as well as clinical trial projects, clinical data collection is prone to errors such as missing data, and misinterpretation or inconsistency of the data. A good quality assurance (QA) program can resolve many such errors though this requires efficient communications between the QA staff and data collectors. Managing such communications is critical to resolving QA problems but imposes a major challenge for a project involving multiple clinical and data processing sites. We have developed a QA issue tracking (QAIT) system to support clinical data QA in the Clinical Breast Care Project (CBCP). This web-based application provides centralized management of QA issues with role-based access privileges. It has greatly facilitated the QA process and enhanced the overall quality of the CBCP clinical data. As a stand-alone system, QAIT can supplement any other clinical data management systems and can be adapted to support other projects. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.
Hu, Wenfa; He, Xinhua
2014-01-01
The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.
ERIC Educational Resources Information Center
Tracey, Graham; Riha, James
2009-01-01
Managing business intelligence (BI) projects in higher education is a formidable responsibility that challenges even the most experienced technical project managers. Data source dependencies, uncertain data quality, changing information requirements, and urgency for actionable information are but a few examples among the multitude of challenges.…
Reengineering outcomes management: an integrated approach to managing data, systems, and processes.
Neuman, K; Malloch, K; Ruetten, V
1999-01-01
The integration of outcomes management into organizational reengineering projects is often overlooked or marginalized in proportion to the entire project. Incorporation of an integrated outcomes management program strengthens the overall quality of reengineering projects and enhances their sustainability. This article presents a case study in which data, systems, and processes were reengineered to form an effective Outcomes Management program as a component of the organization's overall project. The authors describe eight steps to develop and monitor an integrated outcomes management program. An example of an integrated report format is included.
The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.
ERIC Educational Resources Information Center
Advanced Technology, Inc., Reston, VA.
Stage Two of the Title IV Quality Control Project is an integrated study of quality in five related Federal financial aid programs for postsecondary students. Section 1 of the paper establishes a framework for defining quality improvements, in order to identify the types of changes that would tend to improve quality across all facets of the…
QUEST for Quality for Students: A Student Quality Concept. Volume 3
ERIC Educational Resources Information Center
Galán Palomares, Fernando Miguel; Todorovski, Blazhe; Kažoka, Asnate; Saarela, Henni
2013-01-01
This is the final publication of the QUEST for Quality for Students (QUEST) project, run by the European Students' Union. The QUEST project has managed to analyse students' views on the quality of higher education to identify areas in which students can become increasingly involved in quality assurance and enhancement processes. This publication…
Intellectual Production Supervision Perform based on RFID Smart Electricity Meter
NASA Astrophysics Data System (ADS)
Chen, Xiangqun; Huang, Rui; Shen, Liman; chen, Hao; Xiong, Dezhi; Xiao, Xiangqi; Liu, Mouhai; Xu, Renheng
2018-03-01
This topic develops the RFID intelligent electricity meter production supervision project management system. The system is designed for energy meter production supervision in the management of the project schedule, quality and cost information management requirements in RFID intelligent power, and provide quantitative information more comprehensive, timely and accurate for supervision engineer and project manager management decisions, and to provide technical information for the product manufacturing stage file. From the angle of scheme analysis, design, implementation and test, the system development of production supervision project management system for RFID smart meter project is discussed. Focus on the development of the system, combined with the main business application and management mode at this stage, focuses on the energy meter to monitor progress information, quality information and cost based information on RFID intelligent power management function. The paper introduces the design scheme of the system, the overall client / server architecture, client oriented graphical user interface universal, complete the supervision of project management and interactive transaction information display, the server system of realizing the main program. The system is programmed with C# language and.NET operating environment, and the client and server platforms use Windows operating system, and the database server software uses Oracle. The overall platform supports mainstream information and standards and has good scalability.
40 CFR 35.925-2 - Water quality management plans and agencies.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management plans and... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with...
40 CFR 35.925-2 - Water quality management plans and agencies.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management plans and... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with...
40 CFR 35.925-2 - Water quality management plans and agencies.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management plans and... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with...
ERIC Educational Resources Information Center
Lokey, Kenneth R.
The Satellite Technology Demonstration (STD), a project of the Federation of Rocky Mountain States, Inc. (FRMS), employed a project management model for its organizational structure. The organization and management system utilized by the STD was designed to accomplish a predetermined set of objectives with the highest quality possible within a…
Implementing Total Quality Management in a University Setting.
ERIC Educational Resources Information Center
Coate, L. Edwin
1991-01-01
Oregon State University implemented Total Quality Management in nine phases: exploration; establishing a pilot study team; defining customer needs; adopting the breakthrough planning process; performing breakthrough planning in divisions; forming daily management teams; initiating cross-functional pilot projects; implementing cross-functional…
The Environmental Management Project Manager`s Handbook for improved project definition
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-02-01
The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, whichmore » is the focus of this handbook.« less
Mission operations and command assurance: Instilling quality into flight operations
NASA Technical Reports Server (NTRS)
Welz, Linda L.; Witkowski, Mona M.; Bruno, Kristin J.; Potts, Sherrill S.
1993-01-01
Mission Operations and Command Assurance (MO&CA) is a Total Quality Management (TQM) task on JPL projects to instill quality in flight mission operations. From a system engineering view, MO&CA facilitates communication and problem-solving among flight teams and provides continuous process improvement to reduce the probability of radiating incorrect commands to a spacecraft. The MO&CA task has evolved from participating as a member of the spacecraft team to an independent team reporting directly to flight project management and providing system level assurance. JPL flight projects have benefited significantly from MO&CA's effort to contain risk and prevent rather than rework errors. MO&CA's ability to provide direct transfer of knowledge allows new projects to benefit from previous and ongoing flight experience.
2014-01-01
The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated. PMID:24672351
Jeffs, Lianne P; Lo, Joyce; Beswick, Susan; Campbell, Heather
2013-01-01
With the movement to advance quality care and improve health care outcomes, organizations have increasingly implemented quality improvement (QI) initiatives to meet these requirements. Key to implementation success is the multilevel involvement of frontline clinicians and leadership. To explore the perceptions and experiences of frontline nurses, project leads, and managers associated with an organization-wide initiative aimed at engaging nurses in quality improvement work. To address the aims of this study, a qualitative research approach was used. Two focus groups were conducted with a total of 13 nurse participants, and individual interviews were done with 10 managers and 6 project leads. Emergent themes from the interview data included the following: improving care in a networked approach; driving QI and having a sense of pride; and overcoming challenges. Specifically, our findings elucidate the value of communities of practice and ongoing mentorship for nurses as key strategies to acquire and apply QI knowledge to a QI project on their respective units. Key challenges emerged including workload and time constraints, as well as resistance to change from staff. Our study findings suggest that leaders need to provide learning opportunities and protected time for frontline nurses to participate in QI projects.
ERIC Educational Resources Information Center
Holt, Dale; Palmer, Stuart; Gosper, Maree; Sankey, Michael; Allan, Garry
2014-01-01
This article reports on the findings of senior leadership interviews in a nationally funded project on distributed leadership in the quality management of online learning environments (OLEs) in higher education. Questions were framed around the development of an OLE quality management framework and the situation of the characteristics of…
[Maintainance of a research tissue bank. (Infra)structural and quality aspects].
Schmitt, S; Kynast, K; Schirmacher, P; Herpel, E
2015-11-01
The availability of high quality human tissue samples and access to associated histopathological and clinical data are essential for biomedical research. Therefore, it is necessary to establish quality assured tissue biobanks that provide high quality tissue samples for research purposes. This entails quality concerns referring not only to the biomaterial specimen itself but encompassing all procedures related to biobanking, including the implementation of structural components, e.g. ethical and legal guidelines, quality management documentation as well as data and project management and information technology (IT) administration. Moreover, an integral aspect of tissue biobanks is the quality assured evaluation of every tissue specimen that is stored in a tissue biobank and used for projects to guarantee high quality assured biomaterial.
Code of Federal Regulations, 2010 CFR
2010-07-01
... projects using innovative processes and techniques. (d) Reserve for water quality management. Each State... water quality management planning under § 35.2023, except that in the case of Guam, the Virgin Islands... State management assistance grants. Each State may request that the Regional Administrator reserve, from...
Floristic Quality Index of Restored Wetlands in Coastal Louisiana
2017-08-01
been used to monitor and assess project performance, resilience, and adaptive management needs. An emerging tool for performing bioassessments in...condition have been used to monitor and assess project performance, resilience, and adaptive management needs. There are three basic levels of wetland...result of saltwater intrusion and rapid subsidence; nevertheless, multiple hydrologic restoration projects (Naomi Outfall Management BA-03c and
ERIC Educational Resources Information Center
Kastner, Theodore A.; Walsh, Kevin K.; Criscione, Teri
1997-01-01
Presents a general model of the structure and functioning of managed care and describes elements (provider networks, fiscal elements, risk estimation, case-mix, management information systems, practice parameters, and quality improvement) critical to people with developmental disabilities. Managed care demonstration projects and a hypothetical…
Multifamily Retrofit Project Manager Job/Task Analysis and Report: September 2013
DOE Office of Scientific and Technical Information (OSTI.GOV)
Owens, C. M.
The development of job/task analyses (JTAs) is one of three components of the Guidelines for Home Energy Professionals project and will allow industry to develop training resources, quality assurance protocols, accredited training programs, and professional certifications. The Multifamily Retrofit Project Manager JTA identifies and catalogs all of the tasks performed by multifamily retrofit project managers, as well as the knowledge, skills, and abilities (KSAs) needed to perform the identified tasks.
Ethical issues in using data from quality management programs.
Nerenz, David R
2009-08-01
Since the advent of formal, data-driven quality improvement programs in health care in the late 1980s and early 1990s, there are have been questions raised about requirements for ethical committee review of quality improvement activities. A form of consensus emerged through a series of articles published between 1996 and 2007, but there is still significant variation among ethics review committees and individual project leaders in applying broad policies on requirements for committee review and/or written informed consent by participants. Recent developments in quality management, particularly the creation and use of multi-site disease registries, have raised new questions about requirements for review and consent, since the activities often have simultaneous research and quality improvement goals. This article discusses ways in which policies designed for local quality improvement projects and data bases may be adapted to apply to multi-site registries and research projects related to them.
7 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) Environmental Protection Agency (EPA) will— (1) Approve 208 water quality management plans, (2) Participate in... approved agricultural portion of 208 water quality management plans for the purpose of selecting among... in improving water quality, and (6) Concur in the selection of project areas and the criteria for...
The Soils and Groundwater – EM-20 S&T Roadmap Quality Assurance Project Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The Soils and Groundwater – EM-20 Science and Technology Roadmap Project is a U.S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies and technology for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by EM-20 Roadmap Project staff.
Putting the Q into Quality Project Management
ERIC Educational Resources Information Center
Lockitt, Bill
2007-01-01
Project management covers a wide range of skills and is one of the best forms of staff development available for the development of skills by doing. This publication is for the use of staff involved in e-learning development projects. An introduction and overview includes discussion of e-learning projects in general and why they are undertaken;…
ERIC Educational Resources Information Center
Croker, Robert E.; And Others
The feasibility of using W. E. Deming's total quality management (TQM) method to define instructional quality was examined by surveying three groups of students attending Idaho State University's College of Education and School of Applied Technology: 31 students seeking cosmetology certification; 75 undergraduates pursuing degrees in corporate…
ERIC Educational Resources Information Center
Tyson, Ben; Unson, Christine; Edgar, Nick
2017-01-01
Three community engagement projects on the South Island of New Zealand are enacting education and communication initiatives to improve the uptake of best management practices on farms regarding nutrient management for improving water quality. Understanding the enablers and barriers to effective community-based catchment management is fundamental…
Analysis of interactions among barriers in project risk management
NASA Astrophysics Data System (ADS)
Dandage, Rahul V.; Mantha, Shankar S.; Rane, Santosh B.; Bhoola, Vanita
2018-03-01
In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success of project management is oftentimes based on the understanding of barriers to effective risk management, application of appropriate risk management methodology, proactive leadership to avoid barriers, workers' attitude, adequate resources, organizational culture, and involvement of top management. This paper represents various risk categories and barriers to risk management in domestic and international projects through literature survey and feedback from project professionals. After analysing the various modelling methods used in project risk management literature, interpretive structural modelling (ISM) and MICMAC analysis have been used to analyse interactions among the barriers and prioritize them. The analysis indicates that lack of top management support, lack of formal training, and lack of addressing cultural differences are the high priority barriers, among many others.
Mission operations and command assurance: Flight operations quality improvements
NASA Technical Reports Server (NTRS)
Welz, Linda L.; Bruno, Kristin J.; Kazz, Sheri L.; Potts, Sherrill S.; Witkowski, Mona M.
1994-01-01
Mission Operations and Command Assurance (MO&CA) is a Total Quality Management (TQM) task on JPL projects to instill quality in flight mission operations. From a system engineering view, MO&CA facilitates communication and problem-solving among flight teams and provides continuous solving among flight teams and provides continuous process improvement to reduce risk in mission operations by addressing human factors. The MO&CA task has evolved from participating as a member of the spacecraft team, to an independent team reporting directly to flight project management and providing system level assurance. JPL flight projects have benefited significantly from MO&CA's effort to contain risk and prevent rather than rework errors. MO&CA's ability to provide direct transfer of knowledge allows new projects to benefit from previous and ongoing flight experience.
40 CFR 35.915 - State priority system and project priorty list.
Code of Federal Regulations, 2010 CFR
2010-07-01
... State priority system and list must be designed to achieve optimum water quality management consistent... water quality management (WQM) plans. The State shall hold a public hearing before submission of the... also sets forth the administrative, management, and public participation procedures required to develop...
ENVIRONMENTAL QUALITY INFORMATION SYSTEM - EQULS® - ITER
This project consisted of an evaluation of the Environmental Quality Information System (EQuIS) software designed by Earthsoft, Inc. as an environmental data management and analysis platform for monitoring and remediation projects. In consultation with the EQuIS vendor, six pri...
Software engineering project management - A state-of-the-art report
NASA Technical Reports Server (NTRS)
Thayer, R. H.; Lehman, J. H.
1977-01-01
The management of software engineering projects in the aerospace industry was investigated. The survey assessed such features as contract type, specification preparation techniques, software documentation required by customers, planning and cost-estimating, quality control, the use of advanced program practices, software tools and test procedures, the education levels of project managers, programmers and analysts, work assignment, automatic software monitoring capabilities, design and coding reviews, production times, success rates, and organizational structure of the projects.
Depression Screening in Chronic Disease Management: A Worksite Health Promotion Initiative.
Jensen, Elizabeth; Dumas, Bonnie P; Edlund, Barbara J
2016-03-01
This pilot project aimed to improve depression symptoms and quality-of-life measures for individuals in a worksite disease management program. Two hundred forty-three individuals were invited to participate, out of which 69 enrolled. The participants had a history of diabetes, hypertension, or hyperlipidemia, and demonstrated depression using the Patient Health Questionnaire-9 (PHQ-9). The project consisted of counseling sessions provided every 2 to 4 weeks by a family nurse practitioner. PHQ-9 scores and those of an instrument that measures quality of life, the Veteran's Rand-12 (VR-12), were compared pre-intervention and post-intervention to evaluate the effectiveness of the project. PHQ-9 and VR-12 Mental Health Component (MHC) scores improved significantly after 3 months of nurse practitioner-led individual counseling sessions. This project demonstrated that depression screening and therapeutic management, facilitated by a nurse practitioner, can improve depression and perceived quality of life in individuals with hypertension, hyperlipidemia, or type 2 diabetes. © 2015 The Author(s).
IEC 61511 and the capital project process--a protective management system approach.
Summers, Angela E
2006-03-17
This year, the process industry has reached an important milestone in process safety-the acceptance of an internationally recognized standard for safety instrumented systems (SIS). This standard, IEC 61511, documents good engineering practice for the assessment, design, operation, maintenance, and management of SISs. The foundation of the standard is established by several requirements in Part 1, Clauses 5-7, which cover the development of a management system aimed at ensuring that functional safety is achieved. The management system includes a quality assurance process for the entire SIS lifecycle, requiring the development of procedures, identification of resources and acquisition of tools. For maximum benefit, the deliverables and quality control checks required by the standard should be integrated into the capital project process, addressing safety, environmental, plant productivity, and asset protection. Industry has become inundated with a multitude of programs focusing on safety, quality, and cost performance. This paper introduces a protective management system, which builds upon the work process identified in IEC 61511. Typical capital project phases are integrated with the management system to yield one comprehensive program to efficiently manage process risk. Finally, the paper highlights areas where internal practices or guidelines should be developed to improve program performance and cost effectiveness.
Grenier, J Letitia; Davis, Jay A
2010-01-01
The SBSPRP is an extensive tidal wetland restoration project that is underway at the margin of South San Francisco Bay, California. The Project, which aims to restore former salt ponds to tidal marsh and manage other ponds for water bird support, is taking place in the context of a highly urbanized watershed and an Estuary already impacted by chemical contaminants. There is an intimate relationship between water quality in the watershed, the Bay, and the transitional wetland areas where the Project is located. The Project seeks to restore habitat for endangered and endemic species and to provide recreational opportunities for people. Therefore, water quality and bioaccumulation of contaminants in fish and wildlife is an important concern for the success of the Project. Mercury, PCBs, and PBDEs are the persistent contaminants of greatest concern in the region. All of these contaminants are present at elevated concentrations both in the abiotic environment and in wildlife. Dioxins, pyrethroids, PAHs, and selenium are also problematic. Organochlorine insecticides have historically impacted the Bay, and they remain above thresholds for concern in a small proportion of samples. Emerging contaminants, such as PFCs and non-PBDE flame retardants, are also an important water quality issue. Beyond chemical pollutants, other concerns for water quality in South San Francisco Bay exist, and include biological constituents, especially invasive species, and chemical attributes, such as dissolved oxygen and salinity. Future changes, both from within the Project and from the Bay and watershed, are likely to influence water quality in the region. Project actions to restore wetlands could worsen, improve, or not affect the already impaired water quality in South Bay. Accelerated erosion of buried sediment as a consequence of Project restoration actions is a potentially serious regional threat to South Bay water and sediment quality. Furthermore, the planned restoration of salt ponds to tidal marsh has raised concerns about possible increased net production of methylmercury and its subsequent accumulation in the food web. This concern applies not only to the restored marshes, but also to the South Bay as a whole, which could be affected on a regional scale. The ponds that are converted to tidal marsh will sequester millions of cubic meters of sediment. Sequestration of sediment in marshes could remove contaminated sediment from the active zone of the Bay but could also create marshes with contaminated food webs. Some of the ponds will not be restored to marsh but will be managed for use by water birds. Therefore, the effect of dense avian populations on eutrophication and the introduction of pathogens should be considered. Water quality in the Project also could be affected by external changes, such as human population growth and climate change. To address these many concerns related to water quality, the SBSPRP managers, and others faced with management of wetland restoration at a regional scale, should practice adaptive management and ongoing monitoring for water quality, particularly monitoring bioaccumulation of contaminants in the food web.
The seven habits of highly effective project managers
NASA Astrophysics Data System (ADS)
Warner, Mark; Summers, Richard
2016-08-01
Why do some astronomy projects succeed, while others fail? There are obviously many different factors that can and do influence the outcome of any given project, but one of the most prevalent characteristics among successful projects is the combined skills and qualifications of the project manager (PM) at their helms. But this begs an obvious question: what exactly makes a project manager "skilled and qualified?" Asked another way, are there common traits, philosophies, and/or techniques that the most successful PMs share, and if so, what are they? The short answer is yes, the majority successful engineering project managers have significant skills, habits, and character traits in common. The longer answer is there are at least seven of these key traits, or "habits" that many successful PMs share and, more importantly, implement within their respective projects. This paper presents these key factors, including thoughts on scope and quality management, cost and schedule control, project team structures, risk management strategies, stakeholder management, and general project execution.
34 CFR 606.21 - What are the selection criteria for planning grants?
Code of Federal Regulations, 2010 CFR
2010-07-01
... adequate. (c) Project Management. The Secretary reviews each application to determine the quality of the... which the proposed project costs are necessary and reasonable. (Approved by the Office of Management and... resources to help implement the project; and (4) The planning process is likely to achieve its intended...
Richard W. Haynes; Roger D. Fight
1992-01-01
Grade-specific price projections were developed for Douglas-fir, coast hem-fir, inland hem-fir, and ponderosa pine lumber. These grade-specific price projections can be used in evaluating management practices that will affect the quality of saw logs produced under various management regimes.
34 CFR 606.21 - What are the selection criteria for planning grants?
Code of Federal Regulations, 2011 CFR
2011-07-01
... adequate. (c) Project Management. The Secretary reviews each application to determine the quality of the... which the proposed project costs are necessary and reasonable. (Approved by the Office of Management and... resources to help implement the project; and (4) The planning process is likely to achieve its intended...
34 CFR 606.21 - What are the selection criteria for planning grants?
Code of Federal Regulations, 2013 CFR
2013-07-01
... adequate. (c) Project Management. The Secretary reviews each application to determine the quality of the... which the proposed project costs are necessary and reasonable. (Approved by the Office of Management and... resources to help implement the project; and (4) The planning process is likely to achieve its intended...
34 CFR 606.21 - What are the selection criteria for planning grants?
Code of Federal Regulations, 2014 CFR
2014-07-01
... adequate. (c) Project Management. The Secretary reviews each application to determine the quality of the... which the proposed project costs are necessary and reasonable. (Approved by the Office of Management and... resources to help implement the project; and (4) The planning process is likely to achieve its intended...
34 CFR 606.21 - What are the selection criteria for planning grants?
Code of Federal Regulations, 2012 CFR
2012-07-01
... adequate. (c) Project Management. The Secretary reviews each application to determine the quality of the... which the proposed project costs are necessary and reasonable. (Approved by the Office of Management and... resources to help implement the project; and (4) The planning process is likely to achieve its intended...
Managing Service Quality with the Balanced Scorecard.
ERIC Educational Resources Information Center
Poll, Roswitha
In order to evaluate and utilize library data for the management process, a German project, sponsored by the German Research Council, uses the Balanced Scorecard as the concept for integrated quality management. Performance indicators across the following four perspectives are combined to produce a balanced evaluation of the library: (1) users,…
[Successful implementation of the EFQM management model at the Department of Ophthalmology in Graz].
Langmann, G; Maier, R; Theisl, A; Bauer, H; Klug, U; Foussek, C; Hödl, R; Wedrich, A; Gliebe, W
2011-04-01
In the context of legal requirements and scarcer resources, the implementation of a quality management (QM) model will provide a competitive advantage or a site warranty for a hospital. For 3 years, the Department of Ophthalmology in Graz has been working with the EFQM model and has now accomplished the first level quality award, namely "Committed to Excellence (C2E)". The project work towards achieving this C2E-award is described below. EFQM stands for European Foundation for Quality Management, an organization that was founded in 1989 by the EU, together with 14 leading enterprises. In the EFQM model, the maturity of an organization in terms of quality is determined through the achievement of a number of quality awards. The C2E award is the first of these awards. At the beginning of our work for the C2E level, the strengths and weaknesses of the Department of Ophthalmology were determined by means of an EFQM questionnaire. Three improvement measures with the highest impact on the performance of the clinic were identified by the questionnaire: 1. The hospitalization of a cataract patient. 2. The lack of information between the various professional parties. 3. The lack of knowledge within the professional groups of the objectives and strategy of the Department of Ophthalmology. These areas requiring improvement were targeted, addressed and improved in a 6-months project work, structured by the EFQM model. The project work as a whole, the results obtained and the corresponding written documentation were evaluated positively in a 1-day assessment by Quality Austria. The EFQM model is a challenging quality management model. After the necessary training of project members or under the supervision of experienced quality managers, the EFQM model may be successfully applied to patient care, teaching and research in a department of ophthalmology.
Relationship between time management in construction industry and project management performance
NASA Astrophysics Data System (ADS)
Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin
2016-08-01
Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.
SWMM 5 REDEVELOPMENT QUALITY ASSURANCE PROGRAM
EPA recently released a new version of the Storm Water Management Model (SWMM) that combines a new interface with a completely re-written computational engine. The SWMM redevelopment project proceeded under a Quality Assurance Project Plan (QAPP) that describes methods and proced...
While condition reports are useful to managers, demonstrating how to implement a monitoring and assessment program in the future is also an important project goal. Better monitoring methods will make more information more widely available to better manage the nation's great rive...
Chen, Ruo-Bing
2016-11-01
Globally, there is an increasing incidence of inflammatory bowel disease. It is very important for patients to be involved with self-management that can optimize personal heath behavior to control the disease. The aim of this project was to increase nursing staff knowledge of inflammatory bowel disease discharge guidance, and to improve the quality of education for discharged patients, thereby improving their self-management. A baseline audit was conducted by interviewing 30 patients in the gastroenterology ward of Huadong Hospital, Fudan University. The project utilized the Joanna Briggs Institute's Practical Application of Clinical Evidence System and Getting Research Into Practice audit tools for promoting quality of education and self-management of patients with inflammatory bowel disease. Thirty patients were provided with written materials, which included disease education and information regarding self-management. A post-implementation audit was conducted. There was improvement of education prior to discharge and dietary consultancy in the gastroenterology ward. Self-management plans utilizing written materials only were not sufficient for ensuring sustainability of the project. Comprehensive self-management education can make a contribution to improving awareness of the importance of self-management for patients with inflammatory bowel disease.
2011-01-01
Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721
ERIC Educational Resources Information Center
McCormick, Ian
2006-01-01
Implementation of IT "solutions" in the context of changes to business processes and efficiency is a common trigger for using formalised project management techniques. The trigger may include topical activities such as job evaluation schemes or quality assurance accreditation. This has led to a blurring of the boundary between projects and…
7 CFR 634.13 - Project applications.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Project Authorization and Funding... State or areawide 208 water quality management plan. (c) Applications shall contain the following... water quality problem (3) Objectives and planned action, (4) Schedule for carrying out the plan, and (5...
Testing, Requirements, and Metrics
NASA Technical Reports Server (NTRS)
Rosenberg, Linda; Hyatt, Larry; Hammer, Theodore F.; Huffman, Lenore; Wilson, William
1998-01-01
The criticality of correct, complete, testable requirements is a fundamental tenet of software engineering. Also critical is complete requirements based testing of the final product. Modern tools for managing requirements allow new metrics to be used in support of both of these critical processes. Using these tools, potential problems with the quality of the requirements and the test plan can be identified early in the life cycle. Some of these quality factors include: ambiguous or incomplete requirements, poorly designed requirements databases, excessive or insufficient test cases, and incomplete linkage of tests to requirements. This paper discusses how metrics can be used to evaluate the quality of the requirements and test to avoid problems later. Requirements management and requirements based testing have always been critical in the implementation of high quality software systems. Recently, automated tools have become available to support requirements management. At NASA's Goddard Space Flight Center (GSFC), automated requirements management tools are being used on several large projects. The use of these tools opens the door to innovative uses of metrics in characterizing test plan quality and assessing overall testing risks. In support of these projects, the Software Assurance Technology Center (SATC) is working to develop and apply a metrics program that utilizes the information now available through the application of requirements management tools. Metrics based on this information provides real-time insight into the testing of requirements and these metrics assist the Project Quality Office in its testing oversight role. This paper discusses three facets of the SATC's efforts to evaluate the quality of the requirements and test plan early in the life cycle, thus preventing costly errors and time delays later.
Transferring skills in quality collaboratives focused on improving patient logistics.
Weggelaar-Jansen, Anne Marie; van Wijngaarden, Jeroen
2018-04-02
A quality improvement collaborative, often used by the Institute for Healthcare Improvement, is used to educate healthcare professionals and improve healthcare at the same time. However, no prior research has been done on the knowledge and skills healthcare professionals need to achieve improvements or the extent to which quality improvement collaboratives help enhance both knowledge and skills. Our research focused on quality improvement collaboratives aiming to improve patient logistics and tried to identify which knowledge and skills are required and to what extent these were enhanced during the QIC. We defined skills important for logistic improvements in a three-phase Delphi study. Based on the Delphi results we made a questionnaire. We surveyed participants in a national quality improvement collaborative to assess the skills rated as 1) important, 2) available and 3) improved during the collaborative. At two sense-making meetings, experts reflected on our findings and hypothesized on how to improve (logistics) collaboratives. The Delphi study found 18 skills relevant for reducing patient access time and 21 for reducing throughput time. All skills retrieved from the Delphi study were scored as 'important' in the survey. Teams especially lacked soft skills connected to project and change management. Analytical skills increased the most, while more reflexive skills needed for the primary goal of the collaborative (reduce access and throughput times) increased modestly. At two sense-making meetings, attendees suggested four improvements for a quality improvement collaborative: 1) shift the focus to project- and change management skills; 2) focus more on knowledge transfer to colleagues; 3) teach participants to adapt the taught principles to their own situations; and 4) foster intra-project reflexive learning to translate gained insights to other projects (inter-project learning). Our findings seem to suggest that Quality collaboratives could benefit if more attention is paid to the transfer of 'soft skills' (e.g. change, project management and communication skills) and reflexive skills (e.g. adjusting logistics principles to specific situations and inter-project translation of experiences).
ERIC Educational Resources Information Center
Karlsson, Sara; Fogelberg, Karin; Kettis, Åsa; Lindgren, Stefan; Sandoff, Mette; Geschwind, Lars
2014-01-01
In this study, four recent self-initiated educational quality projects at Swedish universities are compared and analyzed. The article focuses on how the universities have handled the tension between external demands and internal norms. The aim is to contribute to an improved understanding of quality management in contemporary universities. On the…
Quality Management in Schools: Analysis of Mediating Factors
ERIC Educational Resources Information Center
Díez, Fernando; Iraurgi, Ioseba; Sanchez, Aurelio Villa
2018-01-01
The objective of this study is to contribute to Quality Management Systems (QMS) and their impact on schools in the Basque Country, Spain. Specifically, it analyses two models: the EFQM Excellence Model, which originated in the business world, and the Integrated Quality Project (IQP) Model, which has a humanistic focus and arose from an…
Gironacel[R]: A Virtual Tool for Learning Quality Management
ERIC Educational Resources Information Center
Mendez, Empar; Casadesus, Marti; De Ciurana, Quim
2006-01-01
This article describes the Gironacel[R] project--a virtual learning environment produced by the University of Girona. The purpose of this tool is to make it easier for students studying quality management courses within engineering schools to understand what the "quality culture" is and how to implement the ISO 9001:2000 standard in a…
References on EPA Quality Assurance Project Plans
Provides requirements for the conduct of quality management practices, including quality assurance (QA) and quality control (QC) activities, for all environmental data collection and environmental technology programs performed by or for this Agency.
NASA Technical Reports Server (NTRS)
Raiman, Laura B.
1992-01-01
Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .
NASA Astrophysics Data System (ADS)
Raiman, Laura B.
1992-12-01
Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .
Nilles, Mark A.; Penoyer, Pete E; Ludtke, Amy S.; Ellsworth, Alan C.
2016-07-13
The U.S. Geological Survey (USGS) and the National Park Service (NPS) work together through the USGS–NPS Water-Quality Partnership to support a broad range of policy and management needs related to high-priority water-quality issues in national parks. The program was initiated in 1998 as part of the Clean Water Action Plan, a Presidential initiative to commemorate the 25th anniversary of the Clean Water Act. Partnership projects are developed jointly by the USGS and the NPS. Studies are conducted by the USGS and findings are used by the NPS to guide policy and management actions aimed at protecting and improving water quality.The National Park Service manages many of our Nation’s most highly valued aquatic systems across the country, including portions of the Great Lakes, ocean and coastal zones, historic canals, reservoirs, large rivers, high-elevation lakes and streams, geysers, springs, and wetlands. So far, the Water-Quality Partnership has undertaken 217 projects in 119 national parks. In each project, USGS studies and assessments (http://water.usgs.gov/nps_partnership/pubs.php) have supported science-based management by the NPS to protect and improve water quality in parks. Some of the current projects are highlighted in the NPS Call to Action Centennial initiative, Crystal Clear, which celebrates national park water-resource efforts to ensure clean water for the next century of park management (http://www.nature.nps.gov/water/crystalclear/).New projects are proposed each year by USGS scientists working in collaboration with NPS staff in specific parks. Project selection is highly competitive, with an average of only eight new projects funded each year out of approximately 75 proposals that are submitted. Since the beginning of the Partnership in 1998, 189 publications detailing project findings have been completed. The 217 studies have been conducted in 119 NPS-administered lands, extending from Denali National Park and Preserve in Alaska to Everglades National Park in Florida, and from Acadia National Park in the Northeast to park lands in Hawaii and Pacific Island territories in the West. Project goals range from periodic stream monitoring, to determining the occurrence and concentrations of contaminants and the potential for them to exceed human health or aquatic life criteria, to conducting interpretive studies to evaluate the effect(s) on or vulnerability of national park resources to visitor usage and other natural and anthropogenic activities.
34 CFR 607.21 - What are the selection criteria for planning grants?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Management. The Secretary reviews each application to determine the quality of the plan to manage the project... implement the project; and (4) The planning process is likely to achieve its intended results. (b) Key... in the project based on the extent to which— (1) The past experience and training of key personnel...
34 CFR 607.21 - What are the selection criteria for planning grants?
Code of Federal Regulations, 2013 CFR
2013-07-01
... Management. The Secretary reviews each application to determine the quality of the plan to manage the project... implement the project; and (4) The planning process is likely to achieve its intended results. (b) Key... in the project based on the extent to which— (1) The past experience and training of key personnel...
34 CFR 607.21 - What are the selection criteria for planning grants?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Management. The Secretary reviews each application to determine the quality of the plan to manage the project... implement the project; and (4) The planning process is likely to achieve its intended results. (b) Key... in the project based on the extent to which— (1) The past experience and training of key personnel...
34 CFR 607.21 - What are the selection criteria for planning grants?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Management. The Secretary reviews each application to determine the quality of the plan to manage the project... implement the project; and (4) The planning process is likely to achieve its intended results. (b) Key... in the project based on the extent to which— (1) The past experience and training of key personnel...
34 CFR 607.21 - What are the selection criteria for planning grants?
Code of Federal Regulations, 2014 CFR
2014-07-01
... Management. The Secretary reviews each application to determine the quality of the plan to manage the project... implement the project; and (4) The planning process is likely to achieve its intended results. (b) Key... in the project based on the extent to which— (1) The past experience and training of key personnel...
NASA Astrophysics Data System (ADS)
Sasidhar, Jaladanki; Muthu, D.; Venkatasubramanian, C.; Ramakrishnan, K.
2017-07-01
The success of any construction project will depend on efficient management of resources in a perfect manner to complete the project with a reasonable budget and time and the quality cannot be compromised. The efficient and timely procurement of material, deployment of adequate labor at correct time and mobilization of machinery lacking in time, all of them causes delay, lack of quality and finally affect the project cost. It is known factor that Project cost can be controlled by taking corrective actions on mobilization of resources at a right time. This research focuses on integration of management systems with the computer to generate the model which uses OOM data structure which decides to include automatic commodity code generation, automatic takeoff execution, intelligent purchase order generation, and components of design and schedule integration to overcome the problems of stock out. To overcome the problem in equipment management system inventory management module is suggested and the data set of equipment registration number, equipment number, description, date of purchase, manufacturer, equipment price, market value, life of equipment, production data of the equipment which includes equipment number, date, name of the job, hourly rate, insurance, depreciation cost of the equipment, taxes, storage cost, interest, oil, grease, and fuel consumption, etc. is analyzed and the decision support systems to overcome the problem arising out improper management is generated. The problem on labor is managed using scheduling, Strategic management of human resources. From the generated support systems tool, the resources are mobilized at a right time and help the project manager to finish project in time and thereby save the abnormal project cost and also provides the percentage that can be improved and also research focuses on determining the percentage of delays that are caused by lack of management of materials, manpower and machinery in different types of projects and how the percentage various from project to project.
Evaluation of Safety, Quality and Productivity in Construction
NASA Astrophysics Data System (ADS)
Usmen, M. A.; Vilnitis, M.
2015-11-01
This paper examines the success indicators of construction projects, safety, quality and productivity, in terms of their implications and impacts during and after construction. First safety is considered during construction with a focus on hazard identification and the prevention of occupational accidents and injuries on worksites. The legislation mandating safety programs, training and compliance with safety standards is presented and discussed. Consideration of safety at the design stage is emphasized. Building safety and the roles of building codes in prevention of structural failures are also covered in the paper together with factors affecting building failures and methods for their prevention. Quality is introduced in the paper from the perspective of modern total quality management. Concepts of quality management, quality control, quality assurance and Six Sigma and how they relate to building quality and structural integrity are discussed with examples. Finally, productivity concepts are presented with emphasis on effective project management to minimize loss of productivity, complimented by lean construction and lean Six Sigma principles. The paper concludes by synthesizing the relationships between safety, quality and productivity.
Accountability and Other CAUSES of Total Quality Management.
ERIC Educational Resources Information Center
Aamot, Karen; Piotrowski, Craig
1995-01-01
Describes Total Quality Management (TQM) techniques implemented at Waukesha County Technical College (Wisconsin). The CAUSES program focuses on customers, accountability, understanding, self-improvement, education, and searching. Describes application of TQM to the fixed-asset team project. Four figures are included. (LMI)
Collaborating for care: initial experience of embedded case managers across five medical homes.
Treadwell, Janet; Giardino, Angelo
2014-01-01
The purpose of this intervention was to answer the following question: Does an embedded nurse case manager from a health plan performing embedded care coordination and supporting a quality improvement project impact medical home service use, role satisfaction, and per member per month expense? The setting for this study was primary care medical home practices with a minimum of 1,000 lives, contracted with a health plan delivering Medicaid and Children's Health Insurance coverage. Five medical home practice sites were selected for the intervention. The study began with case manager training and project permission in 5 medical homes, followed by implementation of care coordination with health plan clients. The nurse case manager performed care coordination functions for clients and initiated a Lean Six Sigma quality improvement project at the medical home site. The analysis strategy was to compare each medical home with itself before and after the intervention, as well as to obtain satisfaction information from medical home staff and care coordinators. Reductions in expense, as demonstrated by decreased per member per month claim cost, admissions per thousand, and reduced variation in days per thousand, were documented. Quality projects attained significant improvements in 4 out of 5 sites, and practice staff as well as case managers described satisfaction with the embedded nurse case manager role. These findings support medical homes as being an effective delivery model of the Affordable Care Act. Case managers who practice in primary care sites can make a significant difference in patient outcomes and practice efficiencies. Embedded case managers have the ability to impact the population being served through modeling and supporting interprofessional relationships and case management expertise. Use of motivational interviewing, assessment skills, advocacy, and joint care planning engage patients in their own care, whereas quality initiatives bring efficiencies and effectiveness to overall operations. There is need for research to be conducted across a larger number of practice sites and diverse populations to substantiate the effect of embedded case management in medical home.
Installation Restoration Program Stage 3. McClellan Air Force Base Quality Assurance Project Plan
1989-08-30
QUALITY ASSURANCE PROJECT PLAN TDTM FINAL ELECTE C\\ JAUG 3 119891 .. .. . .. 0.. ... PREPARD.FOR HEDURTR FL/E WRGTPATRO .. F... OHI.443 ........ 1N...P.E. Contract Program Manager \\ 0 RADMAN 0 TABLE OF CONTENTS Section Page 1.0 INTRODUCTION ................................................... 1 of 6...Section: 1.0 RADM Revision: 1 CO PO AIO NDate: 04/12/89 O Page 1 of 6 1.0 INTRODUCTION The Quality Assurance Project Plan (QAPP) presents in specific
Factors of human capital related to project success in health care work units.
Suhonen, Marjo; Paasivaara, Leena
2011-03-01
To explore factors of human capital related to project success that employees expect from nurse managers. Human capital refers to those resources that managers working with projects possess, such as abilities, knowledge and qualities of character. The data were collected by open interviews (n=14) with nurses, public health nurses and nurse managers working in primary health care and a hospital. Data analysis was carried out using qualitative content analysis. The main factors of human capital related to project success proved to be as follows: (1) management of enthusiastic project culture, (2) management of regeneration and (3) management of emotional intelligence. Future research is needed on the kind of means nurse managers use in human capital management in projects and how they see their possibilities in managing human capital. Human capital management skills should be underlined as an important competence area when recruiting a nurse manager. The success of health care projects cannot be improved only through education or by training of nurse managers; in addition, projects need nurse managers who understand workplace spirituality and have high emotional intelligence. © 2011 The Authors. Journal compilation © 2011 Blackwell Publishing Ltd.
Quality assurance in transition.
Blumenfeld, S N
1993-06-01
This paper outlines the early approaches to quality assurance, and its transition from business to health care. It then describes the development of the more recent trends in quality assurance of Total Quality Management and Continuous Quality Improvement and discusses the strengths and weaknesses of these approaches. The paper then goes on to show how these approaches have been modified for application to peripheral health services in developing countries through the work of the Primary Health Care Operations Research Project and the Quality Assurance Project.
NASA Astrophysics Data System (ADS)
Cristini, Luisa
2017-04-01
Scientific and technological research carried out within universities and public research institutions often involves large collaborations across several countries. Despite the considerable budget (typically millions of Euros), the high expectations (high impact scientific findings, new technological developments and links with policy makers, industry and civil society) and the length of the project over several years, these international projects often rely heavily on the personal skills of the management team (project coordinator, project manager, principal investigators) without a structured, transferable framework. While this approach has become an established practice, it's not ideal and can jeopardise the success of the entire effort with consequences ranging from schedule delays, loss of templates/systems, financial charges and ultimately project failure. In this presentation I will show the advantages of integrating a globally recognised standard for professional project management, such as the PMP® by the Project Management Institute, into academic research. I will cover the project management knowledge areas (integration management, scope management, time management, cost management, quality management, human resources management, risk management, procurement management, and stakeholder management) and the processes within these throughout the phases of the project lifetime (project initiation, planning, executing, monitoring and controlling, and closure). I will show how application of standardised, transferable procedures, developed within the business & administration sector, can benefit academia and more generally scientific research.
Engels, Yvonne; van den Hombergh, Pieter; Mokkink, Henk; van den Hoogen, Henk; van den Bosch, Wil; Grol, Richard
2006-01-01
Aim To study the effects of a team-based model for continuous quality improvement (CQI) on primary care practice management. Design of study Randomised controlled trial. Setting Twenty-six intervention and 23 control primary care practices in the Netherlands. Method Practices interested in taking part in the CQI project were, after assessment of their practice organisation, randomly assigned to the intervention or control groups. During a total of five meetings, a facilitator helped the teams in the intervention group select suitable topics for quality improvement and follow a structured approach to achieve improvement objectives. Checklists completed by an outreach visitor, questionnaires for the GPs, staff and patients were used to assemble data on the number and quality of improvement activities undertaken and on practice management prior to the start of the intervention and 1 year later. Results Pre-test and post-test data were compared for the 26 intervention and 23 control practices. A significant intervention effect was found for the number of improvement objectives actually defined (93 versus 54, P<0.001) and successfully completed (80 versus 69% of the projects, P<0.001). The intervention group also improved on more aspects of practice management, as measured by our practice visit method, than the control group but none of these differences proved statistically significant. Conclusion The intervention exerted a significant effect on the number and quality of improvement projects undertaken and self-defined objectives met. Failure of the effects of the intervention on the other dimensions of practice management to achieve significance may be due to the topics selected for some of the improvement projects being only partly covered by the assessment instrument. PMID:17007709
NASA Astrophysics Data System (ADS)
Liu, Yuling; Wang, Xiaoping; Zhu, Yuhui; Fei, Lanlan
2017-08-01
This paper introduces a Comprehensively Functional Integrated Management Information System designed for the Optical Engineering Major by the College of Optical Science and Engineering, Zhejiang University, which combines the functions of teaching, students learning, educational assessment and management. The system consists of 5 modules, major overview, online curriculum, experiment teaching management, graduation project management and teaching quality feedback. The major overview module introduces the development history, training program, curriculums and experiment syllabus and teaching achievements of optical engineering major in Zhejiang University. The Management Information System is convenient for students to learn in a mobile and personalized way. The online curriculum module makes it very easy for teachers to setup a website for new curriculums. On the website, teachers can help students on their problems about the curriculums in time and collect their homework online. The experiment teaching management module and the graduation project management module enables the students to fulfill their experiment process and graduation thesis under the help of their supervisors. Before students take an experiment in the lab, they must pass the pre-experiment quiz on the corresponding module. After the experiment, students need to submit the experiment report to the web server. Moreover, the module contains experiment process video recordings, which are very helpful to improve the effect of the experiment education. The management of the entire process of a student's graduation program, including the project selection, mid-term inspection, progress report of every two weeks, final thesis, et al, is completed by the graduation project management module. The teaching quality feedback module is not only helpful for teachers to know whether the education effect of curriculum is good or not, but also helpful for the administrators of the college to know whether the design of syllabus is reasonable or not. The Management Information System changes the management object from the education results to the entire education processes. And it improves the efficiency of the management. It provides an effective method to promote curriculum construction management by supervision and evaluation, which improves students' learning outcomes and the quality of curriculums. As a result, it promotes the quality system of education obviously.
Increasing the Use of Earth Science Data and Models in Air Quality Management.
Milford, Jana B; Knight, Daniel
2017-04-01
In 2010, the U.S. National Aeronautics and Space Administration (NASA) initiated the Air Quality Applied Science Team (AQAST) as a 5-year, $17.5-million award with 19 principal investigators. AQAST aims to increase the use of Earth science products in air quality-related research and to help meet air quality managers' information needs. We conducted a Web-based survey and a limited number of follow-up interviews to investigate federal, state, tribal, and local air quality managers' perspectives on usefulness of Earth science data and models, and on the impact AQAST has had. The air quality managers we surveyed identified meeting the National Ambient Air Quality Standards for ozone and particulate matter, emissions from mobile sources, and interstate air pollution transport as top challenges in need of improved information. Most survey respondents viewed inadequate coverage or frequency of satellite observations, data uncertainty, and lack of staff time or resources as barriers to increased use of satellite data by their organizations. Managers who have been involved with AQAST indicated that the program has helped build awareness of NASA Earth science products, and assisted their organizations with retrieval and interpretation of satellite data and with application of global chemistry and climate models. AQAST has also helped build a network between researchers and air quality managers with potential for further collaborations. NASA's Air Quality Applied Science Team (AQAST) aims to increase the use of satellite data and global chemistry and climate models for air quality management purposes, by supporting research and tool development projects of interest to both groups. Our survey and interviews of air quality managers indicate they found value in many AQAST projects and particularly appreciated the connections to the research community that the program facilitated. Managers expressed interest in receiving continued support for their organizations' use of satellite data, including assistance in retrieving and interpreting data from future geostationary platforms meant to provide more frequent coverage for air quality and other applications.
QUALITY ASSURANCE PROJECT PLANS: A USELESS PAPER EXERCISE OR VALUABLE AID?
Two perspectives on the fundamental question "Are quality assurance project plans (QAPPS) a useless paper exercise or a valuable aid?" will be explored. These perspectives include those of a Branch Chief (i.e., the supervisor/manager) and an active researcher. As a Branch Chief, ...
Successful healthcare programs and projects: organization portfolio management essentials.
Pickens, Scott; Solak, Jamie
2005-01-01
Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.
Pérez-Pérez, Martín; Glez-Peña, Daniel; Fdez-Riverola, Florentino; Lourenço, Anália
2015-02-01
Document annotation is a key task in the development of Text Mining methods and applications. High quality annotated corpora are invaluable, but their preparation requires a considerable amount of resources and time. Although the existing annotation tools offer good user interaction interfaces to domain experts, project management and quality control abilities are still limited. Therefore, the current work introduces Marky, a new Web-based document annotation tool equipped to manage multi-user and iterative projects, and to evaluate annotation quality throughout the project life cycle. At the core, Marky is a Web application based on the open source CakePHP framework. User interface relies on HTML5 and CSS3 technologies. Rangy library assists in browser-independent implementation of common DOM range and selection tasks, and Ajax and JQuery technologies are used to enhance user-system interaction. Marky grants solid management of inter- and intra-annotator work. Most notably, its annotation tracking system supports systematic and on-demand agreement analysis and annotation amendment. Each annotator may work over documents as usual, but all the annotations made are saved by the tracking system and may be further compared. So, the project administrator is able to evaluate annotation consistency among annotators and across rounds of annotation, while annotators are able to reject or amend subsets of annotations made in previous rounds. As a side effect, the tracking system minimises resource and time consumption. Marky is a novel environment for managing multi-user and iterative document annotation projects. Compared to other tools, Marky offers a similar visually intuitive annotation experience while providing unique means to minimise annotation effort and enforce annotation quality, and therefore corpus consistency. Marky is freely available for non-commercial use at http://sing.ei.uvigo.es/marky. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.
Total Quality Management Master Plan
1989-01-01
Enhanced competitiveness in the private . public and international sectors - Increased cash flow, influenced by contractor’s contributions to quality I...the project applies novel public- sector compensation concepts gleaned from the best in the private sector . Major employee development opportunities...management must strive to upgrade the quality of worklife which will also contribute to an environment which fosters continuous improvement. Individuals
Putnam, James E.; Hansen, Cristi V.
2014-01-01
As the Nation’s principle earth-science information agency, the U.S. Geological Survey (USGS) is depended on to collect data of the highest quality. This document is a quality-assurance plan for groundwater activities (GWQAP) of the Kansas Water Science Center. The purpose of this GWQAP is to establish a minimum set of guidelines and practices to be used by the Kansas Water Science Center to ensure quality in groundwater activities. Included within these practices are the assignment of responsibilities for implementing quality-assurance activities in the Kansas Water Science Center and establishment of review procedures needed to ensure the technical quality and reliability of the groundwater products. In addition, this GWQAP is intended to complement quality-assurance plans for surface-water and water-quality activities and similar plans for the Kansas Water Science Center and general project activities throughout the USGS. This document provides the framework for collecting, analyzing, and reporting groundwater data that are quality assured and quality controlled. This GWQAP presents policies directing the collection, processing, analysis, storage, review, and publication of groundwater data. In addition, policies related to organizational responsibilities, training, project planning, and safety are presented. These policies and practices pertain to all groundwater activities conducted by the Kansas Water Science Center, including data-collection programs, interpretive and research projects. This report also includes the data management plan that describes the progression of data management from data collection to archiving and publication.
When Measurement Benefits the Measured
2014-04-23
manage how you estimate your work and how you manage the quality of our work. Knowledge workers manage themselves with data. Software engineers...development, coaching, and training. His current research and development interests include data quality assessment and improvement, project...was an engineer and manager at Boeing in Seattle. He has a Masters Degree in Systems Engineering and is a senior member of IEEE. Mark is a certified
The CHPRC Columbia River Protection Project Quality Assurance Project Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each projectmore » within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.« less
Ragsdale, R.; Vowinkel, E.; Porter, D.; Hamilton, P.; Morrison, R.; Kohut, J.; Connell, B.; Kelsey, H.; Trowbridge, P.
2011-01-01
The Integrated Ocean Observing System (IOOS??) Regional Associations and Interagency Partners hosted a water quality workshop in January 2010 to discuss issues of nutrient enrichment and dissolved oxygen depletion (hypoxia), harmful algal blooms (HABs), and beach water quality. In 2007, the National Water Quality Monitoring Council piloted demonstration projects as part of the National Water Quality Monitoring Network (Network) for U.S. Coastal Waters and their Tributaries in three IOOS Regional Associations, and these projects are ongoing. Examples of integrated science-based solutions to water quality issues of major concern from the IOOS regions and Network demonstration projects are explored in this article. These examples illustrate instances where management decisions have benefited from decision-support tools that make use of interoperable data. Gaps, challenges, and outcomes are identified, and a proposal is made for future work toward a multiregional water quality project for beach water quality.
Ragsdale, Rob; Vowinkel, Eric; Porter, Dwayne; Hamilton, Pixie; Morrison, Ru; Kohut, Josh; Connell, Bob; Kelsey, Heath; Trowbridge, Phil
2011-01-01
The Integrated Ocean Observing System (IOOS®) Regional Associations and Interagency Partners hosted a water quality workshop in January 2010 to discuss issues of nutrient enrichment and dissolved oxygen depletion (hypoxia), harmful algal blooms (HABs), and beach water quality. In 2007, the National Water Quality Monitoring Council piloted demonstration projects as part of the National Water Quality Monitoring Network (Network) for U.S. Coastal Waters and their Tributaries in three IOOS Regional Associations, and these projects are ongoing. Examples of integrated science-based solutions to water quality issues of major concern from the IOOS regions and Network demonstration projects are explored in this article. These examples illustrate instances where management decisions have benefited from decision-support tools that make use of interoperable data. Gaps, challenges, and outcomes are identified, and a proposal is made for future work toward a multiregional water quality project for beach water quality.
Wawrzyniak, Zbigniew M; Paczesny, Daniel; Mańczuk, Marta; Zatoński, Witold A
2011-01-01
Large-scale epidemiologic studies can assess health indicators differentiating social groups and important health outcomes of the incidence and mortality of cancer, cardiovascular disease, and others, to establish a solid knowledgebase for the prevention management of premature morbidity and mortality causes. This study presents new advanced methods of data collection and data management systems with current data quality control and security to ensure high quality data assessment of health indicators in the large epidemiologic PONS study (The Polish-Norwegian Study). The material for experiment is the data management design of the large-scale population study in Poland (PONS) and the managed processes are applied into establishing a high quality and solid knowledge. The functional requirements of the PONS study data collection, supported by the advanced IT web-based methods, resulted in medical data of a high quality, data security, with quality data assessment, control process and evolution monitoring are fulfilled and shared by the IT system. Data from disparate and deployed sources of information are integrated into databases via software interfaces, and archived by a multi task secure server. The practical and implemented solution of modern advanced database technologies and remote software/hardware structure successfully supports the research of the big PONS study project. Development and implementation of follow-up control of the consistency and quality of data analysis and the processes of the PONS sub-databases have excellent measurement properties of data consistency of more than 99%. The project itself, by tailored hardware/software application, shows the positive impact of Quality Assurance (QA) on the quality of outcomes analysis results, effective data management within a shorter time. This efficiency ensures the quality of the epidemiological data and indicators of health by the elimination of common errors of research questionnaires and medical measurements.
Integrating Six Sigma with total quality management: a case example for measuring medication errors.
Revere, Lee; Black, Ken
2003-01-01
Six Sigma is a new management philosophy that seeks a nonexistent error rate. It is ripe for healthcare because many healthcare processes require a near-zero tolerance for mistakes. For most organizations, establishing a Six Sigma program requires significant resources and produces considerable stress. However, in healthcare, management can piggyback Six Sigma onto current total quality management (TQM) efforts so that minimal disruption occurs in the organization. Six Sigma is an extension of the Failure Mode and Effects Analysis that is required by JCAHO; it can easily be integrated into existing quality management efforts. Integrating Six Sigma into the existing TQM program facilitates process improvement through detailed data analysis. A drilled-down approach to root-cause analysis greatly enhances the existing TQM approach. Using the Six Sigma metrics, internal project comparisons facilitate resource allocation while external project comparisons allow for benchmarking. Thus, the application of Six Sigma makes TQM efforts more successful. This article presents a framework for including Six Sigma in an organization's TQM plan while providing a concrete example using medication errors. Using the process defined in this article, healthcare executives can integrate Six Sigma into all of their TQM projects.
The TTSD in conjunction with a multi-agency Chesapeake Bay Project team, has developed this handbook to provide state and local governments and others "How-to" steps needed to design, employ, and maintain water quality monitoring, data management/delivery, and communications syst...
Water Resources Research Grant Program Project Descriptions: Fiscal Year 1988
Lew, Melvin; McCoy, Beverly M.
1989-01-01
This report contains information on the 38 new projects funded by the U.S. Geological Survey's Water Resources Research Grant Program in fiscal year 1988 and on 11 projects completed during the year. For the new projects, the report gives the grant number, project title, performing organization, principal investigator(s), project duration, and a project description that includes: (1) identification of water-related problems and problem-solution approach, (2) contribution to problem solution, (3) objectives, and (4) approach. The 38 projects include 14 in the area of ground-water quality problems, 10 in the science and technology of water-quality management, 4 in climate variability and the hydrologic cycle, 7 in institutional change in water-resources management, and 3 in miscellaneous water-resources management problems. For the 11 completed projects, the report gives the grant number, project title, performing organization, principal investigator(s), starting date, date of receipt of final report, and an abstract of the final report. Each project description provides the information needed to obtain a copy of the final report. The report also contains tables showing (1) proposals received according to area of research interest, (2) grant awards and funding according to area of research interest, (3) proposals received according to type of submitting organization, and (4) awards and funding according to type of organization.
Improving Software Quality and Management Through Use of Service Level Agreements
2005-03-01
many who believe that the quality of the development process is the best predictor of software product quality. ( Fenton ) Repeatable software processes...reduced errors per KLOC for small projects ( Fenton ), and the quality management metric (QMM) (Machniak, Osmundson). There are also numerous IEEE 14...attention to cosmetic user interface issues and any problems that may arise with the prototype. (Sawyer) The validation process is also another check
Automated support for experience-based software management
NASA Technical Reports Server (NTRS)
Valett, Jon D.
1992-01-01
To effectively manage a software development project, the software manager must have access to key information concerning a project's status. This information includes not only data relating to the project of interest, but also, the experience of past development efforts within the environment. This paper describes the concepts and functionality of a software management tool designed to provide this information. This tool, called the Software Management Environment (SME), enables the software manager to compare an ongoing development effort with previous efforts and with models of the 'typical' project within the environment, to predict future project status, to analyze a project's strengths and weaknesses, and to assess the project's quality. In order to provide these functions the tool utilizes a vast corporate memory that includes a data base of software metrics, a set of models and relationships that describe the software development environment, and a set of rules that capture other knowledge and experience of software managers within the environment. Integrating these major concepts into one software management tool, the SME is a model of the type of management tool needed for all software development organizations.
NASA Technical Reports Server (NTRS)
Liang, T.; Mcnair, A. J.; Philipson, W. R.
1977-01-01
Aircraft and satellite remote sensing technology were applied in the following areas: (1) evaluation of proposed fly ash disposal sites; (2) development of priorities for drainage improvements; (3) state park analysis for rehabilitation and development; (4) watershed study for water quality planning; and (5) assistance project-landfill site selection. Results are briefly summarized. Other projects conducted include: (1) assessment of vineyard-related problems; (2) LANDSAT analysis for pheasant range management; (3) photo-historic evaluation of Revolutionary War sites; and (4) thermal analysis of building insulation. The objectives, expected benefits and actions, and status of these projects are described.
Lehmkuhl, D; Meissner, W; Neugebauer, E A M
2011-09-01
Demonstration of improved postoperative pain management by implementation of the S3 guidelines on treatment of acute perioperative and posttraumatic pain, by the integrated quality management concept "quality management acute pain" of the TÜV Rheinland or by participation in the benchmark project "Quality improvement in postoperative pain management" (QUIPS). A prospective controlled study (pre-post design) was carried out in hospitals with various levels of care comparing three hospital groups (n = 17/7/3, respectively). Group 1: participation in the QUIPS project (intraclinic and interclinic comparison of outcome data of postoperative pain treatment), group 2: participation in the quality management acute pain program (certified by TÜV Rheinland), group 3: control group with no involvement in either of the two concepts. In all three groups, an anonymous data collection was performed consisting of patient-reported pain intensity, side effects, pain disability and patient satisfaction. Pain therapy intervention was carried out only in group 2 by an integrated quality management concept (certification project: Quality management acute pain) with a package of measures to improve structure, process and outcome quality. The TÜV Rheinland certified clinics (group 2) showed a significant improvement in the pre-post comparison (before versus after certification) in the areas maximum pain (from visual analogue scale VAS 4.6 to 3.7), stress pain (5.3 to 3.9), pain-related impairment (proportion of patients with pain-linked decreased mobility and movement 26% to 16.1%, coughing and breathing 23.1% to 14.3%) and patient satisfaction (from 13.2 to 13.7; scale 0 completely unsatisfied, 15 very satisfied). The clinics with participation in QUIPS for 2 years also showed a significant improvement in stress pain (numeric rating scale NRS for pain 4.5 to 4.2), pain-linked-limitation of coughing and breathing (28% to 23.6%), and patient satisfaction (from 11.9 to 12.4). There were no differences in postoperative nausea and vomiting between any of the groups. The main objective of the certification concept quality management acute pain as a tool for the successful implementation of the S3 guidelines on treatment of acute perioperative and posttraumatic pain, led to a significant improvement in patient outcome. Participation in QUIPS is an ideal supplement to TÜV Rheinland certification and can be recommended as a benchmarking tool to evaluate outcome.
Use of wetlands for water quality improvement under the USEPA Region V Clean Lakes Program
NASA Astrophysics Data System (ADS)
Landers, Judith C.; Knuth, Barbara A.
1991-03-01
The United States Environmental Protection Agency (USEPA) Region V Clean Lakes Program employs artificial and modified natural wetlands in an effort to improve the water quality of selected lakes. We examined use of wetlands at seven lake sites and evaluated the physical and institutional means by which wetland projects are implemented and managed, relative to USEPA program goals and expert recommendations on the use of wetlands for water quality improvement. Management practices recommended by wetlands experts addressed water level and retention, sheet flow, nutrient removal, chemical treatment, ecological and effectiveness monitoring, and resource enhancement. Institutional characteristics recommended included local monitoring, regulation, and enforcement and shared responsibilities among jurisdictions. Institutional and ecological objectives of the National Clean Lakes Program were met to some degree at every site. Social objectives were achieved to a lesser extent. Wetland protection mechanisms and appropriate institutional decentralization were present at all sites. Optimal management techniques were employed to varying degrees at each site, but most projects lack adequate monitoring to determine adverse ecological impacts and effectiveness of pollutant removal and do not extensively address needs for recreation and wildlife habitat. There is evidence that the wetland projects are contributing to improved lake water quality; however, more emphasis needs to be placed on wetland protection and long-term project evaluation.
A Statistical Project Control Tool for Engineering Managers
NASA Technical Reports Server (NTRS)
Bauch, Garland T.
2001-01-01
This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.
Conscientious Consumerism Project in an Undergraduate Quality Management Class
ERIC Educational Resources Information Center
Helms, Marilyn M.
2014-01-01
This article describes a "conscientious consumerism" project that involves the student as the consumer to either commend or complain to a company about a recent product or service experience. This activity and presentation helps students develop an understanding of the commendation/complaint management process within organizations while…
Curriculum Transformation through Total Quality Management.
ERIC Educational Resources Information Center
Edwards, Barbara; Algozzine, Bob
1995-01-01
Describes a massive cultural transformation project at two Charlotte, North Carolina, elementary schools that used Deming's total quality management principles to restructure curricula according to Boyer's eight commonalities of learning. Shows how the FADE (focus, analyze, develop, and execute) model was used to develop a well-coordinated,…
ERIC Educational Resources Information Center
Pierce, Elizabeth
2007-01-01
The proposal project stretches over a significant portion of the semester-long sophomore course Professional Communication (ENG 250) at Monroe Community College. While developing their proposal project, students need to use time management skills to successfully complete a quality project on time. In addition, excellent oral and written…
ERIC Educational Resources Information Center
Kenny, John
This article explores the perennial tension between the demands of management for quality projects that can be used to attract new markets and students and the traditional scholarly approach to learning. Universities are unique environments compared to industry settings. They are unique in that the responsibility for the quality of the teaching…
Quality Improvement in Gastroenterology Clinical Practice
KHERAJ, RAKHI; TEWANI, SUMEET K.; KETWAROO, GYANPRAKASH; LEFFLER, DANIEL A.
2017-01-01
An emphasis on quality improvement (QI) is vital to the cost-effective provision of evidence-based health care. QI projects in gastroenterology have typically focused on endoscopy to minimize or eliminate procedure-related complications or errors. However, a significant component of gastroenterology care is based on the management of chronic disease. Patients with chronic diseases are seen in many different outpatient practices in the community and academia. In an attempt to ensure that every patient receives high-quality care, major gastrointestinal societies have published guidelines on the management of common gastrointestinal complaints. However, adherence to these guidelines varies. We discuss common outpatient gastrointestinal illnesses with established guidelines for management that could benefit from active QI projects; these would ensure a consistently high standard of care for every patient. PMID:22902758
Project management: importance for diagnostic laboratories.
Croxatto, A; Greub, G
2017-07-01
The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.
48 CFR 536.271 - Project labor agreements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... significant project means a Federal construction project with a total cost to the Federal Government of more... framework for labor-management cooperation to advance the Government's procurement interest in cost, efficiency, and quality. (d) Policy. (1) You may, on a project-by-project basis, use a PLA on a large and...
Water Resources Research Grant Program project descriptions, fiscal year 1987
,
1987-01-01
This report contains information on the 34 new projects funded by the United States Geological Survey 's Water Resources Research Grant Program in fiscal year 1987 and on 3 projects completed during the year. For the new projects, the report gives the grant number, project title, performing organization, principal investigator(s), and a project description that includes: (1) identification of water related problems and problem-solution approach (2) contribution to problem solution, (3) objectives, and (4) approach. The 34 projects include 12 in the area of groundwater quality problems, 12 in the science and technology of water quality management, 1 in climate variability and the hydrologic cycle, 4 in institutional change in water resources management, and 5 in surface water management. For the three completed projects, the report furnishes the grant number; project title; performing organization; principal investor(s); starting data; data of receipt of final report; and an abstract of the final report. Each project description provides the information needed to obtain a copy of the final report. The report contains tables showing: (1) proposals received according to area of research interest, (2) grant awards and funding according to area of research interest, (3) proposals received according to type of submitting organization, and (4) awards and funding according to type of organization. (Author 's abstract)
Using tailored methodical approaches to achieve optimal science outcomes
NASA Astrophysics Data System (ADS)
Wingate, Lory M.
2016-08-01
The science community is actively engaged in research, development, and construction of instrumentation projects that they anticipate will lead to new science discoveries. There appears to be very strong link between the quality of the activities used to complete these projects, and having a fully functioning science instrument that will facilitate these investigations.[2] The combination of using internationally recognized standards within the disciplines of project management (PM) and systems engineering (SE) has been demonstrated to lead to achievement of positive net effects and optimal project outcomes. Conversely, unstructured, poorly managed projects will lead to unpredictable, suboptimal project outcomes ultimately affecting the quality of the science that can be done with the new instruments. The proposed application of these two specific methodical approaches, implemented as a tailorable suite of processes, are presented in this paper. Project management (PM) is accepted worldwide as an effective methodology used to control project cost, schedule, and scope. Systems engineering (SE) is an accepted method that is used to ensure that the outcomes of a project match the intent of the stakeholders, or if they diverge, that the changes are understood, captured, and controlled. An appropriate application, or tailoring, of these disciplines can be the foundation upon which success in projects that support science can be optimized.
Total quality management: Strengths and barriers to implementation and cultural adaptation
NASA Technical Reports Server (NTRS)
Siegfeldt, Denise V.; Glenn, Michael; Hamilton, Louise
1992-01-01
NASA/Langley Research Center (LaRC) is in the process of implementing Total Quality Management (TQM) throughout the organization in order to improve productivity and make the Center an even better place to work. The purpose of this project was to determine strengths and barriers to TQM being implemented and becoming a part of the organizational culture of the Human Resources Management Division (HRMD) at Langley. The target population for this project was both supervisory and nonsupervisory staff of the HMRD. In order to generate data on strengths and barriers to TQM implementation and cultural adaptation, a modified nominal group technique was used.
Tool to assist tribes that apply for Clean Air Act (CAA) funding to draft more effective work plans for projects that will develop tribal knowledge of air quality issues and build tribal expertise to manage air quality on tribal lands.
Project #OPE-FY14-0012, December 19, 2013. The Office of Inspector General (OIG) is starting preliminary research on the U.S. Environmental Protection Agency’s (EPA’s) use of and adherence to quality management policies in chemical risk assessments.
Cost-effectiveness of diabetes case management for low-income populations.
Gilmer, Todd P; Roze, Stéphane; Valentine, William J; Emy-Albrecht, Katrina; Ray, Joshua A; Cobden, David; Nicklasson, Lars; Philis-Tsimikas, Athena; Palmer, Andrew J
2007-10-01
To evaluate the cost-effectiveness of Project Dulce, a culturally specific diabetes case management and self-management training program, in four cohorts defined by insurance status. Clinical and cost data on 3,893 persons with diabetes participating in Project Dulce were used as inputs into a diabetes simulation model. The Center for Outcomes Research Diabetes Model, a published, peer-reviewed and validated simulation model of diabetes, was used to evaluate life expectancy, quality-adjusted life expectancy (QALY), cumulative incidence of complications and direct medical costs over patient lifetimes (40-year time horizon) from a third-party payer perspective. Cohort characteristics, treatment effects, and case management costs were derived using a difference in difference design comparing data from the Project Dulce program to a cohort of historical controls. Long-term costs were derived from published U.S. sources. Costs and clinical benefits were discounted at 3.0 percent per annum. Sensitivity analyses were performed. Incremental cost-effectiveness ratios of $10,141, $24,584, $44,941, and $69,587 per QALY gained were estimated for Project Dulce participants versus control in the uninsured, County Medical Services, Medi-Cal, and commercial insurance cohorts, respectively. The Project Dulce diabetes case management program was associated with cost-effective improvements in quality-adjusted life expectancy and decreased incidence of diabetes-related complications over patient lifetimes. Diabetes case management may be particularly cost effective for low-income populations.
Enhancement of Terrestrial Carbon Sinks through the Reclamation of Abandoned Mined Lands
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gary Kronrad
2004-10-31
This project will determine the optimal forest management method to employ for each of the major commercial tree species so that profitability of timber production only or the combination of timber production and carbon sequestration is maximized. The goal of this project is to achieve DOE's long-term cost goal of sequestering carbon at $10 or less per ton. Because the potential of a forest ecosystem to sequester carbon depends on the species, site quality and management regimes utilized, this project will determine how to optimize carbon sequestration by determining how to optimally manage each species, given a range of sitemore » qualities and economic variables. This project also will determine the effects of a carbon credit market on the method and profitability of forest management, the cost of sequestering carbon, and the amount of carbon that can be sequestered. Information from this project will be used to produce user-friendly manuals which will contain economic and biological data for each of the species. These manuals will inform landowners and forest managers how to manage forests for timber and/or carbon credits, how to maximize financial returns, how much money can be earned, and how much carbon can be stored. Manuals will be disseminated through state and federal agricultural extension services and the forest service of each state, and will be published in forest landowner magazines.« less
Enhancement of Terrestrial Carbon Sinks through the Reclamation of Abandoned Mined Lands
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gary Kronrad
2006-01-31
This project will determine the optimal forest management method to employ for each of the major commercial tree species so that profitability of timber production only or the combination of timber production and carbon sequestration is maximized. The goal of this project is to achieve DOE's long-term cost goal of sequestering carbon at $10 or less per ton. Because the potential of a forest ecosystem to sequester carbon depends on the species, site quality and management regimes utilized, this project will determine how to optimize carbon sequestration by determining how to optimally manage each species, given a range of sitemore » qualities and economic variables. This project also will determine the effects of a carbon credit market on the method and profitability of forest management, the cost of sequestering carbon, and the amount of carbon that can be sequestered. Information from this project will be used to produce user-friendly manuals which will contain economic and biological data for each of the species. These manuals will inform landowners and forest managers how to manage forests for timber and/or carbon credits, how to maximize financial returns, how much money can be earned, and how much carbon can be stored. Manuals will be disseminated through state and federal agricultural extension services and the forest service of each state, and will be published in forest landowner magazines.« less
Enhancement of Terrestrial Carbon Sinks through the Reclamation of Abandoned Mined Lands
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gary Kronrad
2005-04-30
This project will determine the optimal forest management method to employ for each of the major commercial tree species so that profitability of timber production only or the combination of timber production and carbon sequestration is maximized. The goal of this project is to achieve DOE's long-term cost goal of sequestering carbon at $10 or less per ton. Because the potential of a forest ecosystem to sequester carbon depends on the species, site quality and management regimes utilized, this project will determine how to optimize carbon sequestration by determining how to optimally manage each species, given a range of sitemore » qualities and economic variables. This project also will determine the effects of a carbon credit market on the method and profitability of forest management, the cost of sequestering carbon, and the amount of carbon that can be sequestered. Information from this project will be used to produce user-friendly manuals which will contain economic and biological data for each of the species. These manuals will inform landowners and forest managers how to manage forests for timber and/or carbon credits, how to maximize financial returns, how much money can be earned, and how much carbon can be stored. Manuals will be disseminated through state and federal agricultural extension services and the forest service of each state, and will be published in forest landowner magazines.« less
Enhancement of Terrestrial Carbon Sinks throught the Reclamation of Abandoned Mined Lands
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gary Kronrad
2006-06-30
This project will determine the optimal forest management method to employ for each of the major commercial tree species so that profitability of timber production only or the combination of timber production and carbon sequestration is maximized. The goal of this project is to achieve DOE's long-term cost goal of sequestering carbon at $10 or less per ton. Because the potential of a forest ecosystem to sequester carbon depends on the species, site quality and management regimes utilized, this project will determine how to optimize carbon sequestration by determining how to optimally manage each species, given a range of sitemore » qualities and economic variables. This project also will determine the effects of a carbon credit market on the method and profitability of forest management, the cost of sequestering carbon, and the amount of carbon that can be sequestered. Information from this project will be used to produce user-friendly manuals which will contain economic and biological data for each of the species. These manuals will inform landowners and forest managers how to manage forests for timber and/or carbon credits, how to maximize financial returns, how much money can be earned, and how much carbon can be stored. Manuals will be disseminated through state and federal agricultural extension services and the forest service of each state, and will be published in forest landowner magazines.« less
Engaging Clinical Nurses in Quality Improvement Projects.
Moore, Susan; Stichler, Jaynelle F
2015-10-01
Clinical nurses have the knowledge and expertise required to provide efficient and proficient patient care. Time and knowledge deficits can prevent nurses from developing and implementing quality improvement or evidence-based practice projects. This article reviews a process for professional development of clinical nurses that helped them to define, implement, and analyze quality improvement or evidence-based practice projects. The purpose of this project was to educate advanced clinical nurses to manage a change project from inception to completion, using the Six Sigma DMAIC (Define, Measure, Analyze, Improve, Control) Change Acceleration Process as a framework. One-to-one mentoring and didactic in-services advanced the knowledge, appreciation, and practice of advanced practice clinicians who completed multiple change projects. The projects facilitated clinical practice changes, with improved patient outcomes; a unit cultural shift, with appreciation of quality improvement and evidence-based projects; and engagement with colleagues. Project outcomes were displayed in poster presentations at a hospital exposition for knowledge dissemination. Copyright 2015, SLACK Incorporated.
NASA Technical Reports Server (NTRS)
1979-01-01
Contractor information requirements necessary to support the power extension package project of the space shuttle program are specified for the following categories of data: project management; configuration management; systems engineering and test; manufacturing; reliability, quality assurance and safety; logistics; training; and operations.
AGRICULTURAL BEST MANAGEMENT PRACTICE EFFECTIVENESS DATABASE
Resource Purpose:The Agricultural Best Management Practice Effectiveness Database contains the results of research projects which have collected water quality data for the purpose of determining the effectiveness of agricultural management practices in reducing pollutants ...
Applications of turbidity monitoring to forest management in California.
Harris, Richard R; Sullivan, Kathleen; Cafferata, Peter H; Munn, John R; Faucher, Kevin M
2007-09-01
Many California streams have been adversely affected by sedimentation caused by historic and current land uses, including timber harvesting. The impacts of timber harvesting and logging transportation systems on erosion and sediment delivery can be directly measured, modeled, or inferred from water quality measurements. California regulatory agencies, researchers, and land owners have adopted turbidity monitoring to determine effects of forest management practices on suspended sediment loads and water quality at watershed, project, and site scales. Watershed-scale trends in sediment discharge and responses to current forest practices may be estimated from data collected at automated sampling stations that measure turbidity, stream flow, suspended sediment concentrations, and other water quality parameters. Future results from these studies will provide a basis for assessing the effectiveness of modern forest practice regulations in protecting water quality. At the project scale, manual sampling of water column turbidity during high stream flow events within and downstream from active timber harvest plans can identify emerging sediment sources. Remedial actions can then be taken by managers to prevent or mitigate water quality impacts. At the site scale, manual turbidity sampling during storms or high stream flow events at sites located upstream and downstream from new, upgraded, or decommissioned stream crossings has proven to be a valuable way to determine whether measures taken to prevent post-construction erosion and sediment production are effective. Turbidity monitoring at the project and site scales is therefore an important tool for adaptive management. Uncertainty regarding the effects of current forest practices must be resolved through watershed-scale experiments. In the short term, this uncertainty will stimulate increased use of project and site-scale monitoring.
Progress on quality management in the German health system – a long and winding road
Breckenkamp, Juergen; Wiskow, Christiane; Laaser, Ulrich
2007-01-01
The interest in quality management in health care has increased in the last decades as the financial crises in most health systems generated the need for solutions to contain costs while maintaining quality of care. In Germany the development of quality management procedures has been closely linked with health care reforms. Starting in the early nineties quality management issues gained momentum in reform legislation only 10 years later. This review summarizes recent developments in medical quality management as related to the federal reform legislation in Germany. It provides an overview on the infrastructure, actors and on the current discussion concerning quality management in medical care. Germany had to catch up on implementing quality management in the health system compared to other countries. Considerable progress has been made, however, it is recognized that the full integration of quality management will require long-term commitment in developing methods, instruments and communication procedures. The most ambitious project at present is the development of a comprehensive comparative quality management system for hospitals at national level, including public reporting. For the time being medical quality management in Germany is dealt with as a technical and professional issue while the aspects of patient orientation and transparency need further advancement. PMID:17550593
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peck, T; Sparkman, D; Storch, N
''The LLNL Site-Specific Advanced Simulation and Computing (ASCI) Software Quality Engineering Recommended Practices VI.I'' document describes a set of recommended software quality engineering (SQE) practices for ASCI code projects at Lawrence Livermore National Laboratory (LLNL). In this context, SQE is defined as the process of building quality into software products by applying the appropriate guiding principles and management practices. Continual code improvement and ongoing process improvement are expected benefits. Certain practices are recommended, although projects may select the specific activities they wish to improve, and the appropriate time lines for such actions. Additionally, projects can rely on the guidance ofmore » this document when generating ASCI Verification and Validation (VSrV) deliverables. ASCI program managers will gather information about their software engineering practices and improvement. This information can be shared to leverage the best SQE practices among development organizations. It will further be used to ensure the currency and vitality of the recommended practices. This Overview is intended to provide basic information to the LLNL ASCI software management and development staff from the ''LLNL Site-Specific ASCI Software Quality Engineering Recommended Practices VI.I'' document. Additionally the Overview provides steps to using the ''LLNL Site-Specific ASCI Software Quality Engineering Recommended Practices VI.I'' document. For definitions of terminology and acronyms, refer to the Glossary and Acronyms sections in the ''LLNL Site-Specific ASCI Software Quality Engineering Recommended Practices VI.I''.« less
Burnus, M; Benner, V; Becker, L; Müller, D; Stock, S
2014-06-01
To identify and follow up the health relevant effects of change-management-projects and to determine improvements in activities following this change a specific health-controlling instrument with benchmarking options has been developed. This instrument applies scientific quality standards and shows the organisational value in form of an index (BGM-Systemindex). It shows the correlation between the four indices management system, health-related actions, health and absence rate and allows a qualitative view of corporate health promotion on and its long term effects. The initiator for the project was an employee survey, which showed a need for action to improve job satisfaction. The survey was the reason that management initiated an integral change-management-project. The project showed many interfaces with the corporate health promotion (BGM), thus enabling consequent changes to be made and their effects to be evaluated. The aim of the project was to clearly increase employee satisfaction up to the next employee survey. Overall the project can be considered a success as the main aim of the project to increase the employees job satisfaction in the given period of time was clearly accomplished. The BGM-Systemindex also stood the test for comprehensive monitoring of the employees health. The project was able to prove that the health relevant parameters could be optimised and that the quality, acceptance and efficiency of the intervention methods had improved. It also showed a positive development of the early and long term health indicators. This is a positive contrast to available literature, which shows that an insufficient or incorrectly used change management results in a lower employee satisfaction. As a result it was decided to use the tool in future.
NASA Astrophysics Data System (ADS)
Spiegel, Heide; Schlatter, Norman; Haslmayr, Hans-Peter; Baumgarten, Andreas; ten Berge, Hein
2014-05-01
Soils are the main basis for the production of food and feed. Furthermore, the production of biomass for energy and material use is becoming increasingly important. Goals for an optimal management of agricultural soils are, on the one hand, the maintenance or improvement of soil quality and, on the other hand, high productivity and climate change mitigation (reduction of GHG emissions and C sequestration). Thus, the EU project CATCH-C aims to evaluate current management practices concerning these three goals based on indicators derived from long-term field experiments of the project partners and from literature data. A maximum of 72 indicators for productivity, soil quality and the potential for carbon storage in the soil and the reduction of greenhouse gas emissions were selected by the project partners. As indicators for productivity, crop yields are determined in almost all field trials. The content of soil organic carbon (SOC) is an indicator for chemical, physical and biological soil quality and was analysed in the topsoil in all field trials. Less data exist for SOC contents in the subsoil. An important physical soil quality indicator is the bulk density, however, it is not determined in all field trials of the project partners. Therefore, information on SOC stocks, with relevance to carbon storage and climate change mitigation, is not available in all field experiments. Other physical indicators, such as penetration resistance, runoff coefficient and soil losses are evaluated. Essential biological indicators are microbial biomass and the number and weight of earthworms, which have been tested in several field trials. The evaluation of all these indicators will help to select "best management practices" and to address trade-offs and synergies for all indicators under consideration of major European farm type zones. CATCH-C is funded within the 7th Framework Programme for Research, Technological Development and Demonstration, Theme 2 - Biotechnologies, Agriculture & Food. (Grant Agreement N° 289782).
Reid, Beth A; Ridoutt, Lee; O'Connor, Paul; Murphy, Deirdre
2017-09-01
This is the second of two articles about best practice in the management of coding services. The best practice project was part of a year-long project conducted in the Republic of Ireland to review the quality of the Hospital Inpatient Enquiry data for its use in activity-based funding. The four methods used to address the best practice aspect of the project were described in detail in Part 1. The results included in this article are those relating to the coding manager's background, preparation and style, clinical coder (CC) workforce adequacy, the CC workforce structure and career pathway, and the physical and psychological work environment for the clinical coding service. Examples of best practice were found in the study hospitals but there were also areas for improvement. Coding managers would benefit from greater support in the form of increased opportunities for management training and a better method for calculating CC workforce numbers. A career pathway is needed for CCs to progress from entry to expert CC, mentor, manager and quality controller. Most hospitals could benefit from investment in infrastructure that places CCs in a physical environment that tells them they are an important part of the hospital and their work is valued.
Performance, Process, and Costs: Managing Service Quality with the Balanced Scorecard.
ERIC Educational Resources Information Center
Poll, Roswitha
2001-01-01
Describes a cooperative project among three German libraries that used the Balanced Scorecard as a concept for an integrated quality management system. Considers performance indicators across four perspectives that will help academic libraries establish an integrated controlling system and to collect and evaluate performance as well as cost data…
78 FR 53763 - Proposed Collection; 60-day Comment Request Cancer Trials Support Unit (CTSU) (NCI)
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-30
...), will publish periodic summaries of proposed projects to be submitted to the Office of Management and...) Ways to enhance the quality, utility, and clarity of the information to be collected; and (4) Ways to... (OPEN). User satisfaction surveys are compiled as part of the project quality assurance activities and...
USDA-ARS?s Scientific Manuscript database
One of our three program goals for this USDA-ARS-CRIS project is to determine the effects of vineyard and vine microclimate (sunlight, temperature, humidity, etc) upon fruit development, vine productivity, and fruit quality, particularly phenolic compounds. Plant phenolics are important due to their...
Using Group Projects to Teach Process Improvement in a Quality Class
ERIC Educational Resources Information Center
Neidigh, Robert O.
2016-01-01
This paper provides a description of a teaching approach that uses experiential learning to teach process improvement. The teaching approach uses student groups to perform and gather process data in a senior-level quality management class that focuses on Lean Six Sigma. A strategy to link the experiential learning in the group projects to the…
Klemenc-Ketis, Zalika; Poplas-Susič, Antonija
2017-12-01
To determine the possible associations between higher levels of selected quality indicators and the characteristics of providers. In 2011, an ongoing project on a new model of family medicine practice was launched in Slovenia; the family physicians' working team (a family physician and a practice nurse) was extended by a nurse practitioner working 0.5 full-time equivalents. This was an example of a personalised team approach to managing chronic patients. We included all family medicine practices in the six units of the Community Health Centre Ljubljana which were participating in the project in December 2015 (N = 66). Data were gathered from automatic electronic reports on quality indicators provided monthly by each practice. We also collected demographic data. There were 66 family medicine teams in the sample, with 165 members of their teams (66 family physicians, 33 nurse practitioners and 66 practice nurses). Fifty-six (84.4%) of the family physicians were women, as were 32 (97.0%) of the nurse practitioners, and 86 (95.5%) of the practice nurses. Multivariate analysis showed that a higher level of the quality indicator "Examination of diabetic foot once per year" was independently associated with nurse practitioners having attended additional education on diabetes, duration of participation in the project, age and years worked since graduation of nurse practitioners, working in the Center unit and not working in the Bezigrad unit. Characteristics of team members are important in fostering quality management of chronic patients. Nurse practitioners working in new model family practices need obligatory, continuous professional education in the management of chronic patients. The quality of care of chronic patients depends on the specific characteristics of the members of the team, which should be taken into account when planning quality improvements. © 2017 John Wiley & Sons Ltd.
Assessing the quality of cost management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fayne, V.; McAllister, A.; Weiner, S.B.
1995-12-31
Managing environmental programs can be effective only when good cost and cost-related management practices are developed and implemented. The Department of Energy`s Office of Environmental Management (EM), recognizing this key role of cost management, initiated several cost and cost-related management activities including the Cost Quality Management (CQM) Program. The CQM Program includes an assessment activity, Cost Quality Management Assessments (CQMAs), and a technical assistance effort to improve program/project cost effectiveness. CQMAs provide a tool for establishing a baseline of cost-management practices and for measuring improvement in those practices. The result of the CQMA program is an organization that has anmore » increasing cost-consciousness, improved cost-management skills and abilities, and a commitment to respond to the public`s concerns for both a safe environment and prudent budget outlays. The CQMA program is part of the foundation of quality management practices in DOE. The CQMA process has contributed to better cost and cost-related management practices by providing measurements and feedback; defining the components of a quality cost-management system; and helping sites develop/improve specific cost-management techniques and methods.« less
The European initiative for quality management in lung cancer care.
Blum, Torsten G; Rich, Anna; Baldwin, David; Beckett, Paul; De Ruysscher, Dirk; Faivre-Finn, Corinne; Gaga, Mina; Gamarra, Fernando; Grigoriu, Bogdan; Hansen, Niels C G; Hubbard, Richard; Huber, Rudolf Maria; Jakobsen, Erik; Jovanovic, Dragana; Konsoulova, Assia; Kollmeier, Jens; Massard, Gilbert; McPhelim, John; Meert, Anne-Pascale; Milroy, Robert; Paesmans, Marianne; Peake, Mick; Putora, Paul-Martin; Scherpereel, Arnaud; Schönfeld, Nicolas; Sitter, Helmut; Skaug, Knut; Spiro, Stephen; Strand, Trond-Eirik; Taright, Samya; Thomas, Michael; van Schil, Paul E; Vansteenkiste, Johan F; Wiewrodt, Rainer; Sculier, Jean-Paul
2014-05-01
Lung cancer is the commonest cause of cancer-related death worldwide and poses a significant respiratory disease burden. Little is known about the provision of lung cancer care across Europe. The overall aim of the Task Force was to investigate current practice in lung cancer care across Europe. The Task Force undertook four projects: 1) a narrative literature search on quality management of lung cancer; 2) a survey of national and local infrastructure for lung cancer care in Europe; 3) a benchmarking project on the quality of (inter)national lung cancer guidelines in Europe; and 4) a feasibility study of prospective data collection in a pan-European setting. There is little peer-reviewed literature on quality management in lung cancer care. The survey revealed important differences in the infrastructure of lung cancer care in Europe. The European guidelines that were assessed displayed wide variation in content and scope, as well as methodological quality but at the same time there was relevant duplication. The feasibility study demonstrated that it is, in principle, feasible to collect prospective demographic and clinical data on patients with lung cancer. Legal obligations vary among countries. The European Initiative for Quality Management in Lung Cancer Care has provided the first comprehensive snapshot of lung cancer care in Europe.
Integrated watershed planning across jurisdictional boundaries
NASA Astrophysics Data System (ADS)
Watts, A. W.; Roseen, R.; Stacey, P.; Bourdeau, R.
2014-12-01
We will present the foundation for an Coastal Watershed Integrated Plan for three communities in southern New Hampshire. Small communities are often challenged by complex regulatory requirements and limited resources, but are wary of perceived risks in engaging in collaborative projects with other communities. Potential concerns include loss of control, lack of resources to engage in collaboration, technical complexity, and unclear benefits. This project explores a multi-town subwatershed application of integrated planning across jurisdictional boundaries that addresses some of today's highest priority water quality issues: wastewater treatment plant upgrades for nutrient removal; green infrastructure stormwater management for developing and re-developing areas; and regional monitoring of ecosystem indicators in support of adaptive management to achieve nutrient reduction and other water quality goals in local and downstream waters. The project outcome is a collaboratively-developed inter-municipal integrated plan, and a monitoring framework to support cross jurisdictional planning and assess attainment of water quality management goals. This research project has several primary components: 1) assessment of initial conditions, including both the pollutant load inputs and the political, economic and regulatory status within each community, 2) a pollutant load model for point and non-point sources, 3) multi-criteria evaluation of load reduction alternatives 4) a watershed management plan optimized for each community, and for Subwatersheds combining multiple communities. The final plan will quantify the financial and other benefits/drawbacks to each community for both inter municipal and individual pollution control approaches. We will discuss both the technical and collaborative aspects of the work, with lessons learned regarding science to action, incorporation of social, economic and water quality assessment parameters, and stakeholder/researcher interaction.
Price projections for selected grades of Douglas-fir lumber.
Richard W. Haynes; Thomas D. Fahey; Roger D. Fight
1988-01-01
Grade-specific price projections were developed for Douglas-fir lumber produced in the Douglas-fir region. These grade-specific price projections can be used as an aid in evaluating management practices that will affect the quality of saw logs that are produced.
Improve strategic supplier performance using DMAIC to develop a Quality Improvement Plan
NASA Astrophysics Data System (ADS)
Jardim, Kevin P.
Supplier performance that meets the requirements of the customer has long plagued quality professionals. Despite the vast efforts by organizations to improve supplier performance, little has been done to standardize the plan to improve performance. This project presents a guideline and problem-solving strategy using a Define, Measure, Analyze, Improve, and Control (DMAIC) structured tool that will assist in the management and improvement of supplier performance. An analysis of benchmarked Quality Improvement Plans indicated that this topic needs more focus on how to accomplish improved supplier performance. This project is part of a growing body of supplier continuous improvement efforts. With the input of Zodiac Aerospace quality professionals this project's results provide a solution to Quality Improvement Plans and show objective evidence of its benefits. This project contributes to the future research on similar topics.
National Ignition Facility quality assurance program plan revision 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wolfe, C R
1998-06-01
NIF Project activities will be conducted in a manner consistent with the guidance and direction of the DOE Order on Quality Assurance (414.1), the LLNL QA Program, and the Laser Directorate QA Plan. Quality assurance criteria will be applied in a graded manner to achieve a balance between the rigor of application of QA measures and the scale, cost, and complexity of the work involved. Accountability for quality is everyone's, extending from the Project Manager through established lines of authority to all Project personnel, who are responsible for the requisite quality of their own work. The NLF QA Program willmore » be implemented by personnel conducting their activities to meet requirements and expectations, according to established plans and procedures that reflect the way business is to be conducted on the Project.« less
Managing Programmatic Risk for Complex Space System Developments
NASA Technical Reports Server (NTRS)
Panetta, Peter V.; Hastings, Daniel; Brumfield, Mark (Technical Monitor)
2001-01-01
Risk management strategies have become a recent important research topic to many aerospace organizations as they prepare to develop the revolutionary complex space systems of the future. Future multi-disciplinary complex space systems will make it absolutely essential for organizations to practice a rigorous, comprehensive risk management process, emphasizing thorough systems engineering principles to succeed. Project managers must possess strong leadership skills to direct high quality, cross-disciplinary teams for successfully developing revolutionary space systems that are ever increasing in complexity. Proactive efforts to reduce or eliminate risk throughout a project's lifecycle ideally must be practiced by all technical members in the organization. This paper discusses some of the risk management perspectives that were collected from senior managers and project managers of aerospace and aeronautical organizations by the use of interviews and surveys. Some of the programmatic risks which drive the success or failure of projects are revealed. Key findings lead to a number of insights for organizations to consider for proactively approaching the risks which face current and future complex space systems projects.
Does Nursing Facility Use of Habilitation Therapy Improve Performance on Quality Measures?
Fitzler, Sandra; Raia, Paul; Buckley, Fredrick O; Wang, Mei
2016-12-01
The purpose of the project, Centers for Medicare & Medicaid Services (CMS) Innovation study, was to evaluate the impact on 12 quality measures including 10 Minimum Data Set (MDS) publicly reported measures and 2 nursing home process measures using habilitation therapy techniques and a behavior team to manage dementia-related behaviors. A prospective design was used to assess the changes in the measures. A total of 30 Massachusetts nursing homes participated in the project over a 12-month period. Project participation required the creation of an interdisciplinary behavior team, habilitation therapy training, facility visit by the program coordinator, attendance at bimonthly support and sharing calls, and monthly collection of process measure data. Participating facilities showed improvement in 9 of the 12 reported measures. Findings indicate potential quality improvement in having nursing homes learn habilitation therapy techniques and know how to use the interdisciplinary team to manage problem behaviors. © The Author(s) 2016.
John A. Stanturf; Daniel A. Marion; Martin Spetich; Kenneth Luckow; James M. Guldin; Hal O. Liechty; Calvin E. Meier
2000-01-01
The Ouachita Mountains Ecosystem Management Research Project (OEMP) is a large interdisciplinary research project designed to provide the scientific foundation for landscape management at the scale of watersheds. The OEMP has progressed through three phases: developing natural regeneration alternatives to clearcutting and planting; testing of these alternatives at the...
Wagner, C.; Mannion, R.; Hammer, A.; Groene, O.; Arah, O.A.; Dersarkissian, M.; Suñol, R.
2014-01-01
Objective To better understand associations between organizational culture (OC), organizational management structure (OS) and quality management in hospitals. Design A multi-method, multi-level, cross-sectional observational study. Setting and participants As part of the DUQuE project (Deepening our Understanding of Quality improvement in Europe), a random sample of 188 hospitals in 7 countries (France, Poland, Turkey, Portugal, Spain, Germany and Czech Republic) participated in a comprehensive questionnaire survey and a one-day on-site surveyor audit. Respondents for this study (n = 158) included professional quality managers and hospital trustees. Main outcome measures Extent of implementation of quality management systems, extent of compliance with existing management procedures and implementation of clinical quality activities. Results Among participating hospitals, 33% had a clan culture as their dominant culture type, 26% an open and developmental culture type, 16% a hierarchical culture type and 25% a rational culture type. The culture type had no statistically significant association with the outcome measures. Some structural characteristics were associated with the development of quality management systems. Conclusion The type of OC was not associated with the development of quality management in hospitals. Other factors (not culture type) are associated with the development of quality management. An OS that uses fewer protocols is associated with a less developed quality management system, whereas an OS which supports innovation in care is associated with a more developed quality management system. PMID:24671119
Wagner, C; Mannion, R; Hammer, A; Groene, O; Arah, O A; Dersarkissian, M; Suñol, R
2014-04-01
To better understand associations between organizational culture (OC), organizational management structure (OS) and quality management in hospitals. A multi-method, multi-level, cross-sectional observational study. As part of the DUQuE project (Deepening our Understanding of Quality improvement in Europe), a random sample of 188 hospitals in 7 countries (France, Poland, Turkey, Portugal, Spain, Germany and Czech Republic) participated in a comprehensive questionnaire survey and a one-day on-site surveyor audit. Respondents for this study (n = 158) included professional quality managers and hospital trustees. Extent of implementation of quality management systems, extent of compliance with existing management procedures and implementation of clinical quality activities. Among participating hospitals, 33% had a clan culture as their dominant culture type, 26% an open and developmental culture type, 16% a hierarchical culture type and 25% a rational culture type. The culture type had no statistically significant association with the outcome measures. Some structural characteristics were associated with the development of quality management systems. The type of OC was not associated with the development of quality management in hospitals. Other factors (not culture type) are associated with the development of quality management. An OS that uses fewer protocols is associated with a less developed quality management system, whereas an OS which supports innovation in care is associated with a more developed quality management system.
Attaining and maintaining data integrity with configuration management
NASA Astrophysics Data System (ADS)
Huffman, Dorothy J.; Jeane, Shirley A.
1993-08-01
Managers and scientists are concerned about data integrity because they draw conclusions from data that can have far reaching effects. Projects managers use Configuration Management to insure that hardware, software, and project information are controlled. They have not, as yet, applied its rigorously to data. However, there is ample opportunity in the data collection and production process to jeopardize data integrity. Environmental changes, tampering and production problems can all affect data integrity. There are four functions included in the Configuration Management process: configuration identification, control, auditing and status accounting. These functions provide management the means to attain data integrity and the visibility into engineering processes needed to maintain data integrity. When project managers apply Configuration Management processes to data, the data user can trace back through history to validate data integrity. The user knows that the project allowed only orderly changes to the data. He is assured that project personnel followed procedures to maintain data quality. He also has access to status information about the data. The user receives data products with a known integrity level and a means to assess the impact of past events ont he conclusions derived from the data. To obtain these benefits, project managers should apply the Configuration Management discipline to data.
ENVIRONMENTAL DATA MANAGEMENT IN SUPPORT OF SHARING DATA AND MANAGEMENT
A data management system (DMS) was developed, tested and demonstrated to store and manage water quality and quantity (WQ2) data pertaining to U.S. Environmental Protection Agency/Office of Research and Development (EPA/ORD) research projects in standardized formats. This approach...
[Quality assurance and total quality management in residential home care].
Nübling, R; Schrempp, C; Kress, G; Löschmann, C; Neubart, R; Kuhlmey, A
2004-02-01
Quality, quality assurance, and quality management have been important topics in residential care homes for several years. However, only as a result of reform processes in the German legislation (long-term care insurance, care quality assurance) is a systematic discussion taking place. Furthermore, initiatives and holistic model projects, which deal with the assessment and improvement of service quality, were developed in the field of care for the elderly. The present article gives a critical overview of essential developments. Different comprehensive approaches such as the implementation of quality management systems, nationwide expert-based initiatives, and developments towards professionalizing care are discussed. Empirically based approaches, especially those emphasizing the assessment of outcome quality, are focused on in this work. Overall, the authors conclude that in the past few years comprehensive efforts have been made to improve the quality of care. However, the current situation still requires much work to establish a nationwide launch and implementation of evidence-based quality assurance and quality management.
Wetland Management - A Success Story In Transition - Restoration of Bhoj Wetland, India
NASA Astrophysics Data System (ADS)
Mudgal, M. K.; Tech, B. M.; Miwwa
Wetlands are beautiful, biologically diverse, hydrologically disperse and ecological vibrant landscape world wide, embracing soils, water, plants, animals and human be- ing. The population growth in the catchment of wetlands led to multifarious human interventions for deriving maximum benefit from the wetlands and their catchments neglecting and disrespecting the principles of sustainability. This act of destruction has been pronounced in developing countries which are under the grip of poverty, illiteracy and lack of environmental education. SBhoj WetlandS is a Lake situated ´ in Central India, Earthen Dam across the river KOLANS in 1061 AD by then ruler king BHOJ. Till 1950 this Wetland was served as a principal source of water supply, even not requiring filtration. As the city grew and the wetland started getting encir- cled by habitation and urban development, the anthropogenic pressures on the lake increased, thus accelerating the process of eutrophication, making the water unfit for human consumption without due treatment due to deterioration of quality of water. For the conservation and management of Bhoj Wetland (Lake Bhopal) a project is under- taken in the financial assistance from Japan Bank for International Cooperation (JBIC, Japan). The project envisages tackle various issues of conservation and management ofn the wetlands under a multi prongs strategies and manner. Although these issues are deeply interrelated and interlinked but for operational and management ease, these issues have been divided into various sub projects which are being tackled indepen- dently, albeit with undercurrent knowledge and understanding of the related issues and interconnectivity with each other. The Project itself is an apt example of the spectrum of varied problems and issues that come to light when attempts are made for sustain- able conservation and management of a wetland. The Project as envisaged intends to conserve and manage through 14 sub projects as under:- Sub Projects within the wa- ter body 1. Desilting and Dredging 2. Deweeding 3. Deepening and widening of the spill channel 4. Biological control of weeds through acquaculture 5. Improvement and Management of Water Quality through floating fountains 6. Water quality monitoring 7. Restoration of Takia Island Sub Projects in the Fringe Area and in Catchment 8. Catchment Area Treatment through afforestation 9. Construction of check dams, silt traps and cascades 10. Sewerage Scheme 11. Garland Drains 12. Shoreline and Fringe Area Management through Link Road 13. Solid Waste Management 14. Relocation of 1 Dhobighat (Washerman Platform) 2
Effects of organizational context on Lean implementation in five hospital systems.
Harrison, Michael I; Paez, Kathryn; Carman, Kristin L; Stephens, Jennifer; Smeeding, Lauren; Devers, Kelly J; Garfinkel, Steven
2016-01-01
Despite broad agreement among researchers about the value of examining how context shapes implementation of improvement programs and projects, limited attention has been paid to contextual effects on implementation of Lean. To help reduce gaps in knowledge of effects of intraorganizational context, we researched Lean implementation initiatives in five organizations and examined 12 of their Lean rapid improvement projects. All projects aimed at improving clinical care delivery. On the basis of the literature on Lean, innovation, and quality improvement, we developed a framework of factors likely to affect Lean implementation and outcomes. Drawing on the framework, we conducted semistructured interviews and applied qualitative codes to the transcribed interviews. Available documents, data, and observations supplemented the interviews. We constructed case studies of Lean implementation in each organization, compared implementation across organizations, and compared the 12 projects. Intraorganizational characteristics affecting organization-wide Lean initiatives and often also shaping project outcomes included CEO commitment to Lean and active support for it, prior organizational capacity for quality improvement-based performance improvement, alignment of the Lean initiative with the organizational mission, dedication of resources and experts to Lean, staff training before and during projects, establishment of measurable and relevant project targets, planning of project sequences that enhance staff capabilities and commitment without overburdening them, and ensuring communication between project members and other affected staff. Dependence of projects on inputs of new information technology was a barrier to project success. Incremental implementation of Lean produced reported improvements in operational efficiency and occasionally in care quality. However, even under the relatively favorable circumstances prevailing in our study sites, incremental implementation did not readily change organizational culture. This study should alert researchers, managers, and teachers of management to ways that contexts shape Lean implementation and may affect other types of process redesign and quality improvement.
Improving patient satisfaction with pain management using Six Sigma tools.
DuPree, Erin; Martin, Lisa; Anderson, Rebecca; Kathuria, Navneet; Reich, David; Porter, Carol; Chassin, Mark R
2009-07-01
Patient satisfaction as a direct and public measure of quality of care is changing the way hospitals address quality improvement. The feasibility of using the Six Sigma DMAIC (Define, Measure, Analyze, Improve, Control) methodology to improve patient satisfaction as it relates to pain management was evaluated. This project used the DMAIC methodology to improve patients' overall satisfaction with pain management on two inpatient units in an urban academic medical center. Pre- and postintervention patient surveys were conducted. The DMAIC methodology provided a data-driven structure to determine the optimal improvement strategies, as well as a long-term plan for maintaining any improvements. In addition, the Change Acceleration Process (CAP) was used throughout the project's various DMAIC stages to further the work of the team by creating a shared need to meet the objectives of the project. Overall satisfaction with pain management "excellent" ratings increased from 37% to 54%. Both units surpassed the goal of at least 50% of responses in the "excellent" category. Several key drivers of satisfaction with pain management were uncovered in the Analyze phase of the project, and each saw rating increases from the pre-intervention to postintervention surveys. Ongoing monitoring by the hospital inpatient satisfaction survey showed that the pain satisfaction score improved in subsequent quarters as compared with the pre-intervention period. The Six Sigma DMAIC methodology can be used successfully to improve patient satisfaction. The project led to measurable improvements in patient satisfaction with pain management, which have endured past the duration of the Six Sigma project. The Control phase of DMAIC allows the improvements to be incorporated into daily operations.
Study of Collaborative Management for Transportation Construction Project Based on BIM Technology
NASA Astrophysics Data System (ADS)
Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng
2018-03-01
Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.
Zaytsev, Yury V; Morrison, Abigail
2012-01-01
High quality neuroscience research requires accurate, reliable and well maintained neuroinformatics applications. As software projects become larger, offering more functionality and developing a denser web of interdependence between their component parts, we need more sophisticated methods to manage their complexity. If complexity is allowed to get out of hand, either the quality of the software or the speed of development suffer, and in many cases both. To address this issue, here we develop a scalable, low-cost and open source solution for continuous integration (CI), a technique which ensures the quality of changes to the code base during the development procedure, rather than relying on a pre-release integration phase. We demonstrate that a CI-based workflow, due to rapid feedback about code integration problems and tracking of code health measures, enabled substantial increases in productivity for a major neuroinformatics project and additional benefits for three further projects. Beyond the scope of the current study, we identify multiple areas in which CI can be employed to further increase the quality of neuroinformatics projects by improving development practices and incorporating appropriate development tools. Finally, we discuss what measures can be taken to lower the barrier for developers of neuroinformatics applications to adopt this useful technique.
Zaytsev, Yury V.; Morrison, Abigail
2013-01-01
High quality neuroscience research requires accurate, reliable and well maintained neuroinformatics applications. As software projects become larger, offering more functionality and developing a denser web of interdependence between their component parts, we need more sophisticated methods to manage their complexity. If complexity is allowed to get out of hand, either the quality of the software or the speed of development suffer, and in many cases both. To address this issue, here we develop a scalable, low-cost and open source solution for continuous integration (CI), a technique which ensures the quality of changes to the code base during the development procedure, rather than relying on a pre-release integration phase. We demonstrate that a CI-based workflow, due to rapid feedback about code integration problems and tracking of code health measures, enabled substantial increases in productivity for a major neuroinformatics project and additional benefits for three further projects. Beyond the scope of the current study, we identify multiple areas in which CI can be employed to further increase the quality of neuroinformatics projects by improving development practices and incorporating appropriate development tools. Finally, we discuss what measures can be taken to lower the barrier for developers of neuroinformatics applications to adopt this useful technique. PMID:23316158
Analyzing compound and project progress through multi-objective-based compound quality assessment.
Nissink, J Willem M; Degorce, Sébastien
2013-05-01
Compound-quality scoring methods designed to evaluate multiple drug properties concurrently are useful to analyze and prioritize output from drug-design efforts. However, formalized multiparameter optimization approaches are not widely used in drug design. We rank molecules synthesized in drug-discovery projects using simple and aggregated desirability functions reflecting medicinal chemistry 'rules'. Our quality score deals transparently with missing data, a key requirement in drug-hunting projects where data availability is often limited. We further estimate confidence in the interpretation of such a compound-quality measure. Scores and associated confidences provide systematic insight in the quality of emerging chemical equity. Tracking quality of synthetic output over time yields valuable insight into the progress of drug-design teams, with potential applications in risk and resource management of a drug portfolio.
7 CFR 1209.40 - Programs, plans, and projects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... requirements for quality control, grade standards, supply management programs, or other programs that would..., plan, or project, no reference to a brand name, trade name, or State or regional identification of any...
Stockdale, Susan E; Zuchowski, Jessica; Rubenstein, Lisa V; Sapir, Negar; Yano, Elizabeth M; Altman, Lisa; Fickel, Jacqueline J; McDougall, Skye; Dresselhaus, Timothy; Hamilton, Alison B
Although the patient-centered medical home endorses quality improvement principles, methods for supporting ongoing, systematic primary care quality improvement have not been evaluated. We introduced primary care quality councils at six Veterans Health Administration sites as an organizational intervention with three key design elements: (a) fostering interdisciplinary quality improvement leadership, (b) establishing a structured quality improvement process, and (c) facilitating organizationally aligned frontline quality improvement innovation. Our evaluation objectives were to (a) assess design element implementation, (b) describe implementation barriers and facilitators, and (c) assess successful quality improvement project completion and spread. We analyzed administrative records and conducted interviews with 85 organizational leaders. We developed and applied criteria for assessing design element implementation using hybrid deductive/inductive analytic techniques. All quality councils implemented interdisciplinary leadership and a structured quality improvement process, and all but one completed at least one quality improvement project and a toolkit for spreading improvements. Quality councils were perceived as most effective when service line leaders had well-functioning interdisciplinary communication. Matching positions within leadership hierarchies with appropriate supportive roles facilitated frontline quality improvement efforts. Two key resources were (a) a dedicated internal facilitator with project management, data collection, and presentation skills and (b) support for preparing customized data reports for identifying and addressing practice level quality issues. Overall, quality councils successfully cultivated interdisciplinary, multilevel primary care quality improvement leadership with accountability mechanisms and generated frontline innovations suitable for spread. Practice level performance data and quality improvement project management support were critical. In order to successfully facilitate systematic, sustainable primary care quality improvement, regional and executive health care system leaders should engage interdisciplinary practice level leadership in a priority-setting process that encourages frontline innovation and establish local structures such as quality councils to coordinate quality improvement initiatives, ensure accountability, and promote spread of best practices.
[Requirements for the successful installation of an data management system].
Benson, M; Junger, A; Quinzio, L; Hempelmann, G
2002-08-01
Due to increasing requirements on medical documentation, especially with reference to the German Social Law binding towards quality management and introducing a new billing system (DRGs), an increasing number of departments consider to implement a patient data management system (PDMS). The installation should be professionally planned as a project in order to insure and complete a successful installation. The following aspects are essential: composition of the project group, definition of goals, finance, networking, space considerations, hardware, software, configuration, education and support. Project and finance planning must be prepared before beginning the project and the project process must be constantly evaluated. In selecting the software, certain characteristics should be considered: use of standards, configurability, intercommunicability and modularity. Our experience has taught us that vaguely defined goals, insufficient project planning and the existing management culture are responsible for the failure of PDMS installations. The software used tends to play a less important role.
[A quality evaluation tableau for health institutions: an educational tool].
Moll, Marie Christine; Decavel, Frédérique; Merlet, Christine
2009-09-01
For a few years, health institutions have had to comply with the certification and the need to establish the new governance. Thanks to the accreditation version 2 (obtained in 2005), the elaboration of the hospital project (adopted in October, 2006) and the organization in poles since 2006, the quality oriented management became a priority axis at the University Hospital of Angers. The strategic adaptation to quality requirements leads to develop the hospital management, more especially at the level of the clinical, medico technical and administrative poles. The elements of the hospital project including the part about the quality, risk and evaluation aim at being adapted by every pole according to the level of its project. This adaptation which is imposed to each pole manager requires a practical and educational accompaniment allowing at the same time to realize a diagnosis of the progress of the quality approach, a measure of the impact of the global impregnation within the institution and a comparison between pole. A eight axis dashboard with criteria and a user guide were developed from certification ISO 9001, the EFQM manual and the certification manual version 2 of the Healthcare High Authorities. The criteria are transcribed in an EXCEL grid ready to use. Succeeding in estimating your own quality system means that you demonstrate the maturity of the quality approach. The results of this evaluation confirmed those of the certification. The dashboard is a management structuring tool at the service of the multidisciplinary team. Two considerations emerge from these results: First of all, for the hospital top management, the axes to be improved emerge as a priority to determine and target the next annual action plans. The results also allow to support the auto evaluation for the certification version 2010 planned in January of the same year. It is a pragmatic tool which allows auto evaluation and comparison to estimate the pole performances. It is a strategic driving tool for the hospital, for the quality department and for the pole. The pole quality system evaluation dashboard for Healthcare institutions is a simple tool which allies strategy and performance for a better efficiency of the actions to be taken to improve the quality, the risk management and the evaluation of the poles for a better service to the hospital users.
Universal Evaluation: An Invitation to the Creation of Innovative Models for Teacher Training
ERIC Educational Resources Information Center
Fitch, Rosa Isela Gluyas; Pineda, Ziranda González
2014-01-01
In 2007, Mexico's Federal Government, through the Public Education Secretariat, started a project with the participation of the states' education authorities in order to optimize teaching and the management of the quality of schools. This project was carried out as a mean to solve the decades of falling behind that the quality of education in…
Virginia R. Tolbert; Carl C. Trettin; Dale W. Johnson; John W. Parsons; Allan E. Houston; David A. Mays
2001-01-01
Ensuring sustainability of intensively managed woody crops requires determining soil and water quality effects using a combination of field data and modeling projections. Plot- and catchrnent-scale research, models, and meta-analyses are addressing nutrient availability, site quality, and measures to increase short-rotation woody crop (SRWC) productivity and site...
1980-06-01
Dist. AVAIL, and/or SP A Re aw rade tostt.on Organizatin iL.cti *~ NO OSTAGI PtN*V FORn PffVA13 Ut.SIL $3- -. dil -- T I BUSINESS REPLY MAIL... Leadership Qualities Provide Quality Training Programs Establish Realistic Project and Task Priorities Minimize Not Mission Capable Supply (NMCS) 47 zz
Surface-water-quality assessment of the Yakima River basin, Washington; project description
McKenzie, S.W.; Rinella, J.F.
1987-01-01
In April 1986, the U.S. Geological Survey began the National Water Quality Assessment program to: (1) provide a nationally consistent description of the current status of water quality, (2) define water quality trends that have occurred over recent decades, and (3) relate past and present water quality conditions to relevant natural features, the history of land and water use, and land management and waste management practices. At present (1987), The National Water Quality Assessment program is in a pilot studies phase, in which assessment concepts and approaches are being tested and modified to prepare for possible full implementation of the program. Seven pilot projects (four surface water projects and three groundwater projects) have been started. The Yakima River basin in Washington is one of the pilot surface water project areas. The Yakima River basin drains in area of 6,155 sq mi and contains about 1,900 river mi of perennial streams. Major land use activities include growing and harvesting timber, dryland pasture grazing, intense farming and irrigated agriculture, and urbanization. Water quality issues that result from these land uses include potentially large concentrations of suspended sediment, bacteria, nutrients, pesticides, and trace elements that may affect water used for human consumption, fish propagation and passage, contact recreation, livestock watering, and irrigation. Data will be collected in a nine year cycle. The first three years of the cycle will be a period of concentrated data acquisition and interpretation. For the next six years, sample collection will be done at a much lower level of intensity to document the occurrence of any gross changes in water quality. This nine year cycle would then be repeated. Three types of sampling activities will be used for data acquisition: fixed location station sampling, synoptic sampling, and intensive reach studies. (Lantz-PTT)
NASA Astrophysics Data System (ADS)
González, M. R.; Torres, F.; Yoldi, V.; Arcega, F.; Plaza, I.
2012-04-01
It is proposed an integrated management model for an organization. This model is based on the continuous improvement Plan-Do-Check-Act cycle and it intends to integrate the environmental, risk prevention and ethical aspects as well as research, development and innovation projects management in the general quality management structure proposed by ISO 9001:2008. It aims to fulfill the standards ISO 9001, ISO 14001, OSHAS 18001, SGE 21 y 166002.
Identifying challenges in project consultants engagement practices
NASA Astrophysics Data System (ADS)
Shariffuddin, Nadia Alina Amir; Abidin, Nazirah Zainul
2017-10-01
Construction projects, green or conventional, involve multi-faceted disciplines engaged with the goal of delivering products i.e. building, infrastructure etc. at the best quality within stipulated budgets. For green projects, additional attention is added for environmental quality. Due to the various responsibilities and liabilities involved as well as the complexity of the construction process itself, formal engagement of multi-disciplinary professionals i.e. project consultants is required in any construction project. Poor selection of project consultants will lead to a multitude of complications resulting in delay, cost escalation, conflicts and poor quality. This paper explores the challenges that occur during the engagement of project consultants in a green project. As the engagement decision involves developers and architects, these two groups of respondents with green project backgrounds were approached qualitatively using interview technique. The challenges identified are limited experience and knowledge, consultants' fee vs. quality, green complexity, conflicts of interest, clients' extended expectation and less demand in green projects. The construction shifts to green project demands engagement of project consultants with added skills. It is expected that through the identification of challenges, better management and administration can be created which would give impact to the overall process of engagement in green projects.
The paradox of managing a project-oriented matrix: establishing coherence within chaos.
Greiner, L E; Schein, V E
1981-01-01
Projects that require the flexible coordination of multidisciplinary teams have tended to adopt a matrix structure to accomplish complex tasks. Yet these project-oriented matrix structures themselves require careful coordination if they are to realize the objectives set for them. The authors identify the basic organizational questions that project-oriented matrix organizations must face. They examine the relationship between responsibility and authority; the tradeoffs between economic efficiency and the technical quality of the work produced; and the sensitive issues of managing individualistic, highly trained professionals while also maintaining group cohesiveness.
[Extraction of management information from the national quality assurance program].
Stausberg, Jürgen; Bartels, Claus; Bobrowski, Christoph
2007-07-15
Starting with clinically motivated projects, the national quality assurance program has established a legislative obligatory framework. Annual feedback of results is an important means of quality control. The annual reports cover quality-related information with high granularity. A synopsis for corporate management is missing, however. Therefore, the results of the University Clinics in Greifswald, Germany, have been analyzed and aggregated to support hospital management. Strengths were identified by the ranking of results within the state for each quality indicator, weaknesses by the comparison with national reference values. The assessment was aggregated per clinical discipline and per category (indication, process, and outcome). A composition of quality indicators was claimed multiple times. A coherent concept is still missing. The method presented establishes a plausible summary of strengths and weaknesses of a hospital from the point of view of the national quality assurance program. Nevertheless, further adaptation of the program is needed to better assist corporate management.
Augmenting SCA project management and automation framework
NASA Astrophysics Data System (ADS)
Iyapparaja, M.; Sharma, Bhanupriya
2017-11-01
In our daily life we need to keep the records of the things in order to manage it in more efficient and proper way. Our Company manufactures semiconductor chips and sale it to the buyer. Sometimes it manufactures the entire product and sometimes partially and sometimes it sales the intermediary product obtained during manufacturing, so for the better management of the entire process there is a need to keep the track record of all the entity involved in it. Materials and Methods: Therefore to overcome with the problem the need raised to develop the framework for the maintenance of the project and for the automation testing. Project management framework provides an architecture which supports in managing the project by marinating the records of entire requirements, the test cases that were created for testing each unit of the software, defect raised from the past years. So through this the quality of the project can be maintained. Results: Automation framework provides the architecture which supports the development and implementation of the automation test script for the software testing process. Conclusion: For implementing project management framework the product of HP that is Application Lifecycle management is used which provides central repository to maintain the project.
Six Sigma arises from the ashes of TQM with a twist.
Black, Ken; Revere, Lee
2006-01-01
This paper sets out to analyse the use of the Six Sigma methodology to improve quality in healthcare. It looks at how Six Sigma grew out of the concept of Total Quality Management (TQM). Six Sigma is a quality improvement methodology that has been widely adopted by companies since the early 1990s and has grown exponentially in the healthcare industry during the past five years. Some of the main tenets of Six Sigma have emerged from the principles of TQM, including the notion that the entire organization must support the quality effort; that there should be a vigorous education effort; and that a quality improvement process should emphasize root cause analysis. In spite of its early success, TQM "crashed and burned" for several reasons including the fact that financial benefits were difficult to assign to TQM efforts, root cause was not always determined resulting in recurring errors, there was no common metric to measure the level of quality attained, and quality efforts were sometimes aimed at processes or operations that were not critical to the customer. Six Sigma filled the vacuums created by these TQM failures in several ways. Under the Six Sigma methodology, quality improvement projects are carefully defined so that they can be successfully completed within a relatively short time frame. Financials are applied to each completed project so that management knows how much the project saves the institution. On each project, intense study is used to determine root cause analysis; and in the end, a metric known as "sigma level" can be assigned to signify the level of quality. Six Sigma has a "critical to quality" dimension that keeps the quality effort focused on improving only those things that really matter to the customer.
Hayward Youth-Based Trash Capture, Reduction, and Watershed Education Project
Information about the SFBWQP City of Hayward, CA Trash Managment Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.
ERIC Educational Resources Information Center
Ynalvez, Ruby; Garza-Gongora, Claudia; Ynalvez, Marcus Antonius; Hara, Noriko
2014-01-01
Although doctoral mentors recognize the benefits of providing quality advisement and close guidance, those of sharing project management responsibilities with mentees are still not well recognized. We observed that mentees, who have the opportunity to co-manage projects, generate more written output. Here we examine the link between research…
ERIC Educational Resources Information Center
Holcomb, Glenda S.
2010-01-01
This qualitative, phenomenological doctoral dissertation research study explored the software project team members perceptions of changing organizational cultures based on management decisions made at project deviation points. The research study provided a view into challenged or failing government software projects through the lived experiences…
Wagner, Cordula; Groene, Oliver; Thompson, Caroline A; Dersarkissian, Maral; Klazinga, Niek S; Arah, Onyebuchi A; Suñol, Rosa
2014-04-01
The assessment of integral quality management (QM) in a hospital requires measurement and monitoring from different perspectives and at various levels of care delivery. Within the DUQuE project (Deepening our Understanding of Quality improvement in Europe), seven measures for QM were developed. This study investigates the relationships between the various quality measures. It is a multi-level, cross-sectional, mixed-method study. As part of the DUQuE project, we invited a random sample of 74 hospitals in 7 countries. The quality managers of these hospitals were the main respondents. Furthermore, data of site visits of external surveyors assessing the participating hospitals were used. Three measures of QM at hospitals level focusing on integral systems (QMSI), compliance with the Plan-Do-Study-Act quality improvement cycle (QMCI) and implementation of clinical quality (CQII). Four measures of QM activities at care pathway level focusing on Specialized expertise and responsibility (SER), Evidence-based organization of pathways (EBOP), Patient safety strategies (PSS) and Clinical review (CR). Positive significant associations were found between the three hospitals level QM measures. Results of the relationships between levels were mixed and showed most associations between QMCI and department-level QM measures for all four types of departments. QMSI was associated with PSS in all types of departments. By using the seven measures of QM, it is possible to get a more comprehensive picture of the maturity of QM in hospitals, with regard to the different levels and across various types of hospital departments.
NASA Astrophysics Data System (ADS)
Gunawan, D.; Amalia, A.; Rahmat, R. F.; Muchtar, M. A.; Siregar, I.
2018-02-01
Identification of software maturity level is a technique to determine the quality of the software. By identifying the software maturity level, the weaknesses of the software can be observed. As a result, the recommendations might be a reference for future software maintenance and development. This paper discusses the software Capability Level (CL) with case studies on Quality Management Unit (Unit Manajemen Mutu) University of Sumatera Utara (UMM-USU). This research utilized Standard CMMI Appraisal Method for Process Improvement class C (SCAMPI C) model with continuous representation. This model focuses on activities for developing quality products and services. The observation is done in three process areas, such as Project Planning (PP), Project Monitoring and Control (PMC), and Requirements Management (REQM). According to the measurement of software capability level for UMM-USU software, turns out that the capability level for the observed process area is in the range of CL1 and CL2. Planning Project (PP) is the only process area which reaches capability level 2, meanwhile, PMC and REQM are still in CL 1 or in performed level. This research reveals several weaknesses of existing UMM-USU software. Therefore, this study proposes several recommendations for UMM-USU to improve capability level for observed process areas.
Weaknesses in Applying a Process Approach in Industry Enterprises
NASA Astrophysics Data System (ADS)
Kučerová, Marta; Mĺkva, Miroslava; Fidlerová, Helena
2012-12-01
The paper deals with a process approach as one of the main principles of the quality management. Quality management systems based on process approach currently represents one of a proofed ways how to manage an organization. The volume of sales, costs and profit levels are influenced by quality of processes and efficient process flow. As results of the research project showed, there are some weaknesses in applying of the process approach in the industrial routine and it has been often only a formal change of the functional management to process management in many organizations in Slovakia. For efficient process management it is essential that companies take attention to the way how to organize their processes and seek for their continuous improvement.
7 CFR 634.12 - Eligible project areas.
Code of Federal Regulations, 2010 CFR
2010-01-01
... agricultural portion of a 208 water quality management plan, or revised portions thereof, and have identified agricultural nonpoint source water quality problems are eligible for authorization under RCWP. Those critical areas or sources of pollutants significantly contributing to the water quality problems are eligible for...
Groundwater sampling: Chapter 5
Wang, Qingren; Munoz-Carpena, Rafael; Foster, Adam; Migliaccio, Kati W.; Li, Yuncong; Migliaccio, Kati
2011-01-01
Discussing an array of water quality topics, from water quality regulations and criteria, to project planning and sampling activities, this book outlines a framework for improving water quality programs. Using this framework, you can easily put the proper training and tools in place for better management of water resources.
Factual Approach in Decision Making - the Prerequisite of Success in Quality Management
NASA Astrophysics Data System (ADS)
Kučerová, Marta; Škůrková Lestyánszka, Katarína
2013-12-01
In quality management system as well as in other managerial systems, effective decisions must be always based on the data and information analysis, i.e. based on facts, in accordance with the factual approach principle in quality management. It is therefore necessary to measure and collect the data and information about processes. The article presents the results of a conducted survey, which was focused on application of factual approach in decision making. It also offers suggestions for improvements of application of the principle in business practice. This article was prepared using the research results of VEGA project No. 1/0229/08 "Perspectives of the quality management development in relation to the requirements of market in the Slovak Republic".
The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barriermore » at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.« less
[Quality management in acute pain therapy: results from a survey of certified hospitals].
Böhmer, A B; Poels, M; Simanski, C; Trojan, S; Messer, K; Wirtz, M D; Neugebauer, E A M; Wappler, F; Joppich, R
2012-08-01
Systems for and methods of quality management are increasingly being implemented in public health services. The aim of our study was to analyze the current state of the integrated quality management concept "quality management acute pain therapy" of the TÜV Rheinland® (TÜV) after a 5-year project period. General characteristics of the participating hospitals, number of departments certified by the TÜV and implementation of structures and processes according to the TÜV guidelines were evaluated by a mail questionnaire. Furthermore, positive and negative aspects concerning the effects of certification were evaluated by the hospitals' representatives of certification. A total of 36 questionnaires were returned. Since 2006 the number of certified hospitals (2011: n = 48) and surgical departments (2011: n = 202) has increased continuously. The number of certified medical departments is low (2011: n = 39); however, in the last 3 years, it has increased by about 200-300% annually. Standard operative procedures for pain therapy and measurement of pain intensity at regular intervals were implemented in all certified clinics (100%). Although 41% take part in the benchmarking project QUIPS (Quality Improvement in Postoperative Pain Therapy), 24% do not systematically check the quality of the outcome of pain management. Acceptance of the new pain therapy concepts among nursing staff was rated positively (ratio positive:negative 16:1); however, acceptance among physicians was rated negatively (1:15). Certification by the TÜV leads to sustainable implementation of quality management principles. Future efforts should focus on better integration of physicians in acute pain therapy and the development of an integrated tool to measure patients' outcome.
The role of disease management programs in the health behavior of chronically ill patients.
Cramm, Jane Murray; Adams, Samantha A; Walters, Bethany Hipple; Tsiachristas, Apostolos; Bal, Roland; Huijsman, Robbert; Rutten-Van Mölken, Maureen P M H; Nieboer, Anna Petra
2014-04-01
Investigate the effects of disease management program (DMP) implementation on physical activity, smoking, and physical quality of life among chronically ill patients. This study used a mixed-methods approach involving qualitative (35 interviews with project managers) and quantitative (survey of patients from 18 DMPs) data collection. Questionnaire response rates were 51% (2010; 2619/5108) at T0 and 47% (2011; 2191/4693) at T1. Physical activity and the percentage of smokers improved significantly over time, whereas physical quality of life declined. After adjusting for patients' physical quality of life at T0, age, educational level, marital status, and gender, physical activity at T0 (p<0.01), changes in physical activity (p<0.001), and percentage of smokers at T0 (p<0.05) predicted physical quality of life at T1. Project managers reported that DMPs improved patient-professional interaction. The ability to set more concrete targets improved patients' health behaviors. DMPs appear to improve physical activity among chronically ill patients over time. Furthermore, (changes in) health behavior are important for the physical quality of life of chronically ill patients. Redesigning care systems and implementing DMPs based on the chronic care model may improve health behavior among chronically ill patients. Copyright © 2014 The Authors. Published by Elsevier Ireland Ltd.. All rights reserved.
Eisner, Reinhold; Patel, Rakeshkumar
2017-04-20
Quality management systems (QMS), based on ISO 9001 requirements, are applicable to government service organizations such as Health Canada's Biologics and Genetic Therapies Directorate (BGTD). This communication presents the process that the BGTD followed since the early 2000s to implement a quality management system and describes how the regulatory system was improved as a result of this project. BGTD undertook the implementation of a quality management system based on ISO 9001 and containing aspects of ISO 17025 with the goal of strengthening the regulatory system through improvements in the people, processes, and services of the organization. We discuss the strategy used by BGTD to implement the QMS and the benefits that were realized from the various stages of implementation. The eight quality principals upon which the QMS standards of the ISO 9000 series are based were used by senior management as a framework to guide QMS implementation.
Assessing quality in volcanic ash soils
Terry L. Craigg; Steven W. Howes
2007-01-01
Forest managers must understand how changes in soil quality resulting from project implementation affect long-term productivity and watershed health. Volcanic ash soils have unique properties that affect their quality and function; and which may warrant soil quality standards and assessment techniques that are different from other soils. We discuss the concept of soil...
Software Quality Perceptions of Stakeholders Involved in the Software Development Process
ERIC Educational Resources Information Center
Padmanabhan, Priya
2013-01-01
Software quality is one of the primary determinants of project management success. Stakeholders involved in software development widely agree that quality is important (Barney and Wohlin 2009). However, they may differ on what constitutes software quality, and which of its attributes are more important than others. Although, software quality…
KCBX Quality Assurance Project Plan - October 2014
This revised plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring by URS Corporation at the KCBX Terminals Company North and South Terminals in Chicago, Ill.
KCBX Quality Assurance Project Plan - February 2014
This plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring, by URS Corporation, at the KCBX Terminals Company North and South Terminals in Chicago, IL.
Small steps to health: building sustainable partnerships in pediatric obesity care.
Pomietto, Mo; Docter, Alicia Dixon; Van Borkulo, Nicole; Alfonsi, Lorrie; Krieger, James; Liu, Lenna L
2009-06-01
Given the prevalence of childhood obesity and the limited support for preventing and managing obesity in primary care settings, the Seattle Children's Hospital's Children's Obesity Action Team has partnered with Steps to Health King County to develop a pediatric obesity quality-improvement project. Primary care clinics joined year-long quality-improvement collaboratives to integrate obesity prevention and management into the clinic setting by using the chronic-disease model. Sustainability was enhanced through integration at multiple levels by emphasizing small, consistent behavior changes and self-regulation of eating/feeding practices with children, teenagers, and families; building local community partnerships; and encouraging broader advocacy and policy change. Cultural competency and attention to disparities were integrated into quality-improvement efforts. . Participating clinics were able to increase BMI measurement and weight classification; integrate management of overweight/obese children and family and self-management support; and grow community collaborations. Over the course of 4 years, this project grew from a local effort involving 3 clinics to a statewide program recently adopted by the Washington State Department of Health. This model can be used by other states/regions to develop pediatric obesity quality-improvement programs to support the assessment, prevention, and management of childhood obesity. Furthermore, these health care efforts can be integrated into broader community-wide childhood-obesity action plans.
Follstad, Shah J.J.; Dahm, Clifford N.; Gloss, S.P.; Bernhardt, E.S.
2007-01-01
Restoration activity has exponentially increased across the Southwest since 1990. Over 37,000 records were compiled into the National River Restoration Science Synthesis (NRRSS) database to summarize restoration trends and assess project effectiveness. We analyzed data from 576 restoration projects in the Southwest (NRRSS-SW). More than 50% of projects were less than or equal to 3 km in length. The most common restoration project intent categories were riparian management, water quality management, in-stream habitat improvement, and flow modification. Common project activities were well matched to goals. Conservative estimates of total restoration costs exceeded $500 million. Most restoration dollars have been allocated to flow modification and water quality management. Monitoring was linked to 28% of projects across the Southwest, as opposed to just 10% nationwide. Mean costs were statistically similar whether or not projects were monitored. Results from 48 telephone interviews provided validation of NRRSS-SW database analyses but showed that project costs are often underreported within existing datasets. The majority of interviewees considered their projects to be successful, most often based upon observed improvements to biota or positive public reaction rather than evaluation of field data. The efficacy of restoration is difficult to ascertain given the dearth of information contained within most datasets. There is a great need for regional entities that not only track information on project implementation but also maintain and analyze monitoring data associated with restoration. Agencies that fund or regulate restoration should reward projects that emphasize monitoring and evaluation as much as project implementation. ?? 2007 Society for Ecological Restoration International.
Niesink, A; Trappenburg, J C A; de Weert-van Oene, G H; Lammers, J W J; Verheij, T J M; Schrijvers, A J P
2007-11-01
Chronic disease management for patients with chronic obstructive pulmonary disease (COPD) may improve quality, outcomes and access to care. To investigate effectiveness of chronic disease management programmes on the quality-of-life of people with COPD. Medline and Embase (1995-2005) were searched for relevant articles, and reference lists and abstracts were searched for controlled trials of chronic disease management programmes for patients with COPD. Quality-of-life was assessed as an outcome parameter. Two reviewers independently reviewed each paper for methodological quality and extracted the data. We found 10 randomized-controlled trials comparing chronic disease management with routine care. Patient populations, health-care professionals, intensity, and content of the intervention were heterogeneous. Different instruments were used to assess quality of life. Five out of 10 studies showed statistically significant positive outcomes on one or more domains of the quality of life instruments. Three studies, partly located in primary care, showed positive results. All chronic disease management projects for people with COPD involving primary care improved quality of life. In most of the studies, aspects of chronic disease management were applied to a limited extent. Quality of randomized-controlled trials was not optimal. More research is needed on chronic disease management programmes in patients with COPD across primary and secondary care.
Sanders, Julie; Fitzpatrick, Joanne M
2017-01-01
Community rapid response and rehabilitation teams are used to prevent avoidable hospital admissions for adults living with multiple long-term conditions and to support early hospital discharge by providing short-term intensive multidisciplinary support. Supporting self-management is an important service intervention if desired outcomes are to be achieved. A Care Quality Commission inspection of the Richmond Response and Rehabilitation Team in 2014 identified that self-management plans were not routinely developed with service users and reported this as requiring improvement. This quality improvement project aimed to develop and implement a self-management strategy for service users and for 90% of service users to have a personalised self-management plan within 3 months. The quality improvement intervention used the Plan-Do-Study-Act model comprising: (1) the development of a self-management plan, (2) staff education to support service users to self-manage using motivational interviewing techniques, (3) piloting the self-management plan with service users, (4) implementation of the self-management plan and (5) monthly audit and feedback. Evaluation involved an audit of the number and quality of self-management plans developed with service users and a survey of staff knowledge and confidence to support service users to self-manage. Following implementation of the intervention, the number of self-management plans developed in collaboration with service users increased from 0 to 187 over a 4-week period. Monthly audit data confirmed that this improvement has been sustained. Results indicated that staff knowledge and confidence improved after an education intervention. Quality improvement methods facilitated development and operationalisation of a self-management strategy by a community rapid response and rehabilitation team. The next phase of the project is to evaluate the impact of the self-management strategy on key service outcomes including self-efficacy, unplanned and emergency hospital admissions and early discharges.
Gimbel, Sarah; Mwanza, Moses; Nisingizwe, Marie Paul; Michel, Cathy; Hirschhorn, Lisa
2017-12-21
High-quality data are critical to inform, monitor and manage health programs. Over the seven-year African Health Initiative of the Doris Duke Charitable Foundation, three of the five Population Health Implementation and Training (PHIT) partnership projects in Mozambique, Rwanda, and Zambia introduced strategies to improve the quality and evaluation of routinely-collected data at the primary health care level, and stimulate its use in evidence-based decision-making. Using the Consolidated Framework for Implementation Research (CFIR) as a guide, this paper: 1) describes and categorizes data quality assessment and improvement activities of the projects, and 2) identifies core intervention components and implementation strategy adaptations introduced to improve data quality in each setting. The CFIR was adapted through a qualitative theme reduction process involving discussions with key informants from each project, who identified two domains and ten constructs most relevant to the study aim of describing and comparing each country's data quality assessment approach and implementation process. Data were collected on each project's data quality improvement strategies, activities implemented, and results via a semi-structured questionnaire with closed and open-ended items administered to health management information systems leads in each country, with complementary data abstraction from project reports. Across the three projects, intervention components that aligned with user priorities and government systems were perceived to be relatively advantageous, and more readily adapted and adopted. Activities that both assessed and improved data quality (including data quality assessments, mentorship and supportive supervision, establishment and/or strengthening of electronic medical record systems), received higher ranking scores from respondents. Our findings suggest that, at a minimum, successful data quality improvement efforts should include routine audits linked to ongoing, on-the-job mentoring at the point of service. This pairing of interventions engages health workers in data collection, cleaning, and analysis of real-world data, and thus provides important skills building with on-site mentoring. The effect of these core components is strengthened by performance review meetings that unify multiple health system levels (provincial, district, facility, and community) to assess data quality, highlight areas of weakness, and plan improvements.
Managing Faculty Data at the University of Tennessee: The SEDONA Project
ERIC Educational Resources Information Center
Woodroof, Jon B.; Searcy, DeWayne L.
2004-01-01
Information technology plays an increasingly prominent role in the strategic initiatives of higher education institutions. Technology projects are becoming the largest projects on campus, approaching funding levels of bricks and mortar investments. Information systems are viewed as critical in attracting high-quality faculty, staff, and students,…
34 CFR 425.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2010 CFR
2010-07-01
... project management and in fields related to the objectives of the project; and (ii) Any other...) Program factors. (10 points) The Secretary reviews each application to assess the quality of the proposed... postsecondary education programs; (2) Proposes project objectives that contribute to the improvement of...
34 CFR 425.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2011 CFR
2011-07-01
... project management and in fields related to the objectives of the project; and (ii) Any other...) Program factors. (10 points) The Secretary reviews each application to assess the quality of the proposed... postsecondary education programs; (2) Proposes project objectives that contribute to the improvement of...
Adoption of Building Information Modelling in project planning risk management
NASA Astrophysics Data System (ADS)
Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.
2017-11-01
An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.
Warsame, Abukar; Borg, Lena; Lind, Hans
2013-01-01
The aim of this paper is to argue for a number of statements about what is important for a client to do in order to improve quality in new infrastructure projects, with a focus on procurement and organizational issues. The paper synthesizes theoretical and empirical results concerning organizational performance, especially the role of the client for the quality of a project. The theoretical framework used is contract theory and transaction cost theory, where assumptions about rationality and self-interest are made and where incentive problems, asymmetric information, and moral hazard are central concepts. It is argued that choice of procurement type will not be a crucial factor. There is no procurement method that guarantees a better quality than another. We argue that given the right conditions all procurement methods can give good results, and given the wrong conditions, all of them can lead to low quality. What is crucial is how the client organization manages knowledge and the incentives for the members of the organization. This can be summarized as “organizational culture.” One way to improve knowledge and create incentives is to use independent second opinions in a systematic way. PMID:24250274
Characterizing Air Quality in a Rapidly Changing World
The purpose of this paper is to 1) highlight projects collecting large volumes of unique air quality data; 2) explore how the collection of big data fits into the overall picture of air quality management and characterization; 3) provide an update on the E-Enterprise advanced mon...
Project management practice and its effects on project success in Malaysian construction industry
NASA Astrophysics Data System (ADS)
Haron, N. A.; Devi, P.; Hassim, S.; Alias, A. H.; Tahir, M. M.; Harun, A. N.
2017-12-01
The rapid economic development has increased the demand for construction of infrastructure and facilities globally. Sustainable development and globalization are the new ‘Zeitgeist’ of the 21st century. In order to implement these projects successfully and to meet the functional aim of the projects within their lifetime, an efficient project management practice is needed. The aim of this study is to identify the critical success factors (CSFs) and the extent of use of project management practice which affects project success, especially during the implementation stage. Data were obtained from self-administered questionnaires with 232 respondents. A mixed method of data collection was adopted using semi-structured interview and questionnaire approach. The result of the analysis of data obtained showed that new and emerging criteria such as customer satisfaction, competency of the project team, and performance of subcontractors/suppliers are becoming measures of success in addition to the classic iron triangle’s view of time, cost and quality. An insight on the extent of use of different project management practice in the industry was also achieved from the study.
Holve, Erin
2013-01-01
Multi-institutional research and quality improvement (QI) projects using electronic clinical data (ECD) hold great promise for improving quality of care and patient outcomes but typically require significant infrastructure investments both to initiate and maintain the project over its duration. Consequently, it is important for these projects to think holistically about sustainability to ensure their long-term success. Four "pillars" of sustainability are discussed based on the experiences of EDM Forum grantees and other research and QI networks. These include trust and value, governance, management, and financial and administrative support. Two "foundational considerations," adaptive capacity and policy levers, are also discussed.
Total Water Management: A Research Project of the United States Environmental Protection Agency
Total Water Management (TWM) examines urban water systems in an interconnected manner. It encompasses reducing water demands, increasing water recycling and reuse, creating water supply assets from stormwater management, matching water quality to end-use needs, and achieving envi...
Dujardin, Pierre-Philippe; Reverdy, Thomas; Valette, Annick; François, Patrice
2016-06-01
Introduction : project management is on the expected proficiencies for head nurses. Context : The work on the organizations’ improvement carried out by head nurses, is rarely covered in the literature. Objectives : to follow the implementation of actions from projects led by head nurses and to analyze the parameters of success. Method : for a year, an intervention study has followed 17 projects initiating improvement measures. Semistructured interviews were conducted with health-care teams and managers. All of them reported the results of the implementation of each measure as an operational improvement. A mixed analysis containing a logistic regression investigated associations between the result of the action and the various contextual characteristics. Results : this study involved 111 actions. 71 % of them concluded an operational improvement. The organizational and supporting actions had a high success rate, which decreased when hazards were not managed by healthcare managers. Discussion : this study highlights the place of strategies through the implementing methods and the chosen actions. Recommendations are made in order to promote a collective assessment. Conclusion : scientific approaches are proposed to discuss the organizational work.
The report describes a technical assistance project that explored how smart growth and sustainable stormwater management approaches (known as green infrastructure) could be applied to Sussex County, DE.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This quality assurance (QA) plan defines the QA requirements for the dismantlement and removal of Building 3004 at Oak Ridge National Laboratory (ORNL). The building is a four-story wooden trained structure with wooden siding, which resides approximately 150 ft west of the Bulk Shielding Reactor, and only several feet away from the visitors entrance to the Graphite Reactor museum. Complete descriptions and sketches are in the Performance Specification document for this project. This project is being conducted as a non-CERCLA maintenance action. This plan is an appendix to the QA plan for the ORNL Environmental Restoration (ER) Program. ORNL/ER-225, whichmore » is the source of the project QA requirements, tailors those QA requirements to the specific needs of this project as defined in ORNL/ER-225. Project-specific description and organization are also provided in this plan. Appendix B, Records Management Plan, is included.« less
Navarro-Ortega, Alícia; Acuña, Vicenç; Batalla, Ramon J; Blasco, Julián; Conde, Carlos; Elorza, Francisco J; Elosegi, Arturo; Francés, Félix; La-Roca, Francesc; Muñoz, Isabel; Petrovic, Mira; Picó, Yolanda; Sabater, Sergi; Sanchez-Vila, Xavier; Schuhmacher, Marta; Barceló, Damià
2012-05-01
The Consolider-Ingenio 2010 project SCARCE, with the full title "Assessing and predicting effects on water quantity and quality in Iberian Rivers caused by global change" aims to examine and predict the relevance of global change on water availability, water quality, and ecosystem services in Mediterranean river basins of the Iberian Peninsula, as well as their socio-economic impacts. Starting in December 2009, it brought together a multidisciplinary team of 11 partner Spanish institutions, as well as the active involvement of water authorities, river basin managers, and other relevant agents as stakeholders. The study areas are the Llobregat, Ebro, Jucar, and Guadalquivir river basins. These basins have been included in previous studies and projects, the majority of whom considered some of the aspects included in SCARCE but individually. Historical data will be used as a starting point of the project but also to obtain longer time series. The main added value of SCARCE project is the inclusion of scientific disciplines ranging from hydrology, geomorphology, ecology, chemistry, and ecotoxicology, to engineering, modeling, and economy, in an unprecedented effort in the Mediterranean area. The project performs data mining, field, and lab research as well as modeling and upscaling of the findings to apply them to the entire river basin. Scales ranging from the laboratory to river basins are addressed with the potential to help improve river basin management. The project emphasizes, thus, linking basic research and management practices in a single framework. In fact, one of the main objectives of SCARCE is to act as a bridge between the scientific and the management and to transform research results on management keys and tools for improving the River Basin Management Plans. Here, we outline the general structure of the project and the activities conducted within the ten Work Packages of SCARCE.
SIMBA: a web tool for managing bacterial genome assembly generated by Ion PGM sequencing technology.
Mariano, Diego C B; Pereira, Felipe L; Aguiar, Edgar L; Oliveira, Letícia C; Benevides, Leandro; Guimarães, Luís C; Folador, Edson L; Sousa, Thiago J; Ghosh, Preetam; Barh, Debmalya; Figueiredo, Henrique C P; Silva, Artur; Ramos, Rommel T J; Azevedo, Vasco A C
2016-12-15
The evolution of Next-Generation Sequencing (NGS) has considerably reduced the cost per sequenced-base, allowing a significant rise of sequencing projects, mainly in prokaryotes. However, the range of available NGS platforms requires different strategies and software to correctly assemble genomes. Different strategies are necessary to properly complete an assembly project, in addition to the installation or modification of various software. This requires users to have significant expertise in these software and command line scripting experience on Unix platforms, besides possessing the basic expertise on methodologies and techniques for genome assembly. These difficulties often delay the complete genome assembly projects. In order to overcome this, we developed SIMBA (SImple Manager for Bacterial Assemblies), a freely available web tool that integrates several component tools for assembling and finishing bacterial genomes. SIMBA provides a friendly and intuitive user interface so bioinformaticians, even with low computational expertise, can work under a centralized administrative control system of assemblies managed by the assembly center head. SIMBA guides the users to execute assembly process through simple and interactive pages. SIMBA workflow was divided in three modules: (i) projects: allows a general vision of genome sequencing projects, in addition to data quality analysis and data format conversions; (ii) assemblies: allows de novo assemblies with the software Mira, Minia, Newbler and SPAdes, also assembly quality validations using QUAST software; and (iii) curation: presents methods to finishing assemblies through tools for scaffolding contigs and close gaps. We also presented a case study that validated the efficacy of SIMBA to manage bacterial assemblies projects sequenced using Ion Torrent PGM. Besides to be a web tool for genome assembly, SIMBA is a complete genome assemblies project management system, which can be useful for managing of several projects in laboratories. SIMBA source code is available to download and install in local webservers at http://ufmg-simba.sourceforge.net .
DOE Office of Scientific and Technical Information (OSTI.GOV)
Auberle, W.M.; Alvarez, V.M.; Leary, J.
1999-07-01
A collaborative program among agencies and professionals in Mexico and the US is designing, developing and delivering specialized workshops for Mexican officials responsible for air quality management. The initial project is development and pilot delivery (Spring 1999) of a workshop for senior officials of SEMARNAP plus selected state and municipal officials. This paper describes the process for design of professional development programs in air quality management for Mexican officials. Key issues include optimum learning styles and delivery techniques; available time of senior managers for education; need for new materials versus adaptation of existing air quality management information; and utilization ofmore » the Internet and asynchronous methods to supplement the traditional workshop format. The paper describes the results of this analysis and design features and content of the initial workshop.« less
Shaw, C D
2000-06-01
This paper is a summary of the operation, findings and conclusions of a European Union project on external peer review techniques, termed 'ExPeRT', to research the scope, mechanisms and use of external quality mechanisms in the improvement of health care. Many of the themes outlined are described in detail in other papers that have been prepared specifically for this issue of The International Journal for Quality in Health Care. Although the emphasis of this project and of this issue of the Journal is on Europe, the conclusions are more widely relevant.
The PI-Mode of Project Management
NASA Technical Reports Server (NTRS)
Isaac, Dan
1997-01-01
The PI-Mode is NASA's new approach to project management. It responds to the Agency's new policy to develop scientific missions that deliver the highest quality science for a fixed cost. It also attempts to provide more research opportunities by reducing project development times and increasing the number of launches per year. In order to accomplish this, the Principal Investigator is placed at the helm of the project with full responsibility over all aspects of the mission, including instrument and spacecraft development, as well as mission operations and data analysis. This paper intends to study the PI-Mode to determine the strengths and weaknesses of such a new project management technique. It also presents an analysis of its possible impact on the scientific community and its relations with industry, NASA, and other institutions.
Unroe, Kathleen T; Nazir, Arif; Holtz, Laura R; Maurer, Helen; Miller, Ellen; Hickman, Susan E; La Mantia, Michael A; Bennett, Merih; Arling, Greg; Sachs, Greg A
2015-01-01
The Optimizing Patient Transfers, Impacting Medical Quality, and Improving Symptoms: Transforming Institutional Care (OPTIMISTIC) project aims to reduce avoidable hospitalizations of long-stay residents enrolled in 19 central Indiana nursing facilities. This clinical demonstration project, funded by the Centers for Medicare and Medicaid Services Innovations Center, places a registered nurse in each nursing facility to implement an evidence-based quality improvement program with clinical support from nurse practitioners. A description of the model is presented, and early implementation experiences during the first year of the project are reported. Important elements include better medical care through implementation of Interventions to Reduce Acute Care Transfers tools and chronic care management, enhanced transitional care, and better palliative care with a focus on systematic advance care planning. There were 4,035 long-stay residents in 19 facilities enrolled in OPTIMISTIC between February 2013 and January 2014. Root-cause analyses were performed for all 910 acute transfers of these long stay residents. Of these transfers, the project RN evaluated 29% as avoidable (57% were not avoidable and 15% were missing), and opportunities for quality improvement were identified in 54% of transfers. Lessons learned in early implementation included defining new clinical roles, integrating into nursing facility culture, managing competing facility priorities, communicating with multiple stakeholders, and developing a system for collecting and managing data. The success of the overall initiative will be measured primarily according to reduction in avoidable hospitalizations of long-stay nursing facility residents. © 2014, Copyright the Authors Journal compilation © 2014, The American Geriatrics Society.
Tribal Air Grants Framework - Menu of Options
Tool to assist tribes that apply for CAA funding to draft moreeffective work plans for projects that will develop tribal knowledge of air quality issues andbuild tribal expertise to manage air quality on reservations and tribal trust land
GREENROOF RUNOFF WATER QUALITY
This project evaluated green roofs as a stormwater management tool. Specifically, runoff quantity and quality from green and flat asphalt roofs was compared. Evapotranspiration from planted green roofs and evaporation unplanted media roofs was also compared, and the influence of ...
Guidance on Systematic Planning Using the Data Quality Objectives Process, EPA QA/G-4
Provides a standard working tool for project managers and planners to develop DQO for determining the type, quantity, and quality of data needed to reach defensible decisions or make credible estimates.
MO-F-211-01: Methods for Completing Practice Quality Improvement (PQI).
Johnson, J; Brown, K; Ibbott, G; Pawlicki, T
2012-06-01
Practice Quality Improvement (PQI) is becoming an expected part of routine practice in healthcare as an approach to provide more efficient, effective and high quality care. Additionally, as part of the ABR's Maintenance of Certification (MOC) pathway, medical physicists are now expected to complete a PQI project. This session will describe the history behind and benefits of the ABR's MOC program, provide details of quality improvement methods and how to successfully complete a PQI project. PQI methods include various commonly used engineering and management tools. The Plan-Do-Study-Act (PDSA) cycle will be presented as one project planning and implementation tool. Other PQI analysis instruments such as flowcharts, Pareto charts, process control charts and fishbone diagrams will also be explained with examples. Cause analysis, solution development and implementation, and post-implementation measurement will be presented. Project identification and definition as well as appropriate measurement tool selection will be offered. Methods to choose key quality metrics (key quality indicators) will also be addressed. Several sample PQI projects and templates available through the AAPM and other organizations will be described. At least three examples of completed PQI projects will be shared. 1. Identify and define a PQI project 2. Identify and select measurement methods/techniques for use with the PQI project 3. Describe example(s) of completed projects. © 2012 American Association of Physicists in Medicine.
Hydrologic and water quality sensitivity to climate and land ...
This page describes a current EPA ORD project. No project report or other download is available at this time. Please see the section Next Steps below for a timeline of anticipated products of this work. Background: Projected changes in climate during the next century could cause or contribute to increased flooding, drought, water quality degradation, and ecosystem impairment. The effects of climate change in different watersheds will vary due to regional differences in climate change, physiographic setting, and interaction with land-use, pollutant sources, and water management in different locations. EPA is conducting watershed modeling to develop hydrologic and water quality change scenarios for 20 relatively large U.S. watersheds. Watershed modeling will be conducted using the Hydrologic Simulation Program-FORTRAN (HSPF) and Soil Water Assessment Tool (SWAT) watershed models. Study areas range from about 10,000-15,000 square miles in size, and will cover nearly every ecoregion in the United States and a range of hydro-climatic conditions. A range of hydrologic and water quality endpoints will be determined for each watershed simulation. Endpoints will be selected to inform upon a range of stream flow, water quality, aquatic ecosystem, and EPA program management goals and targets. Model simulations will be conducted to evaluate a range of projected future (2040-2070) changes in climate and land-use. Simulations will include baseline conditions,
ERIC Educational Resources Information Center
Oregon State Economic Development Dept., Salem.
The Oregon Advanced Technology Consortium (OATC) created the Partnerships for Quality Project (PQP) to improve Oregon's community colleges by developing a total quality curriculum (TQC) based on the beliefs and practices of total quality management (TQM). This report summarizes the recommendations of the PQP and presents a plan of action for the…
Group diabetes self-management education in a primary care setting: a quality improvement project.
Harris, Tara; Silva, Susan; Intini, Ronald; Smith, Tommy; Vorderstrasse, Allison
2014-01-01
This quality improvement project evaluated the effectiveness of a monthly diabetes self-management education intervention on HbA1C and knowledge levels in patients with type 2 diabetes mellitus. A retrospective analysis evaluating 51 patients found no significant improvement in HbA1C levels; however, there was a significant improvement in knowledge levels. Race was an influential factor on HbA1C levels showing a significant elevation in mean HbA1C in African Americans, while there was a decrease in mean HbA1c in Caucasians over the 6-month evaluation period.
Public Health Nurses in Israel: A Case Study on a Quality Improvement Project of Nurse's Work Life.
Kagan, Ilya; Shachaf, Sara; Rapaport, Zofia; Livne, Tzipi; Madjar, Batya
2017-01-01
Public health nurses (PHNs) working in Well Baby Clinic in Israel's Haifa district were voicing great distress to inspectors-the impossibility of meeting their workload, feeling overwhelmed, poor physical, and technological conditions. They were feeling tired and frustrated and burn-out was rising. The district's nursing management took the decision, together with Tel Aviv University's nursing research unit, to conduct a quality improvement project based on issues that arose from meetings with focus groups on the nurses' difficulties. This paper is a case study of a quality improvement project targeting nurses daily working life. One of its chief contributions is as a study of meeting PHNs' frustration by integrating focus groups and round-table brainstorming (involving nurses, clinic managers and nursing inspectors) in order to identify targets for practical intervention. This strategy has been very successful. It has provided the district's nursing management a battery of forcefully argued and realistically grounded proposals for making the work of Well Baby clinics more relevant to their communities and giving nurses (a) the conditions to meet their assignments and (b) greater professional self-respect. © 2016 Wiley Periodicals, Inc.
[Clinical trial data management and quality metrics system].
Chen, Zhao-hua; Huang, Qin; Deng, Ya-zhong; Zhang, Yue; Xu, Yu; Yu, Hao; Liu, Zong-fan
2015-11-01
Data quality management system is essential to ensure accurate, complete, consistent, and reliable data collection in clinical research. This paper is devoted to various choices of data quality metrics. They are categorized by study status, e.g. study start up, conduct, and close-out. In each category, metrics for different purposes are listed according to ALCOA+ principles such us completeness, accuracy, timeliness, traceability, etc. Some general quality metrics frequently used are also introduced. This paper contains detail information as much as possible to each metric by providing definition, purpose, evaluation, referenced benchmark, and recommended targets in favor of real practice. It is important that sponsors and data management service providers establish a robust integrated clinical trial data quality management system to ensure sustainable high quality of clinical trial deliverables. It will also support enterprise level of data evaluation and bench marking the quality of data across projects, sponsors, data management service providers by using objective metrics from the real clinical trials. We hope this will be a significant input to accelerate the improvement of clinical trial data quality in the industry.
Transforming an EPA QA/R-2 quality management plan into an ISO 9002 quality management system.
Kell, R A; Hedin, C M; Kassakhian, G H; Reynolds, E S
2001-01-01
The Environmental Protection Agency's (EPA) Office of Emergency and Remedial Response (OERR) requires environmental data of known quality to support Superfund hazardous waste site projects. The Quality Assurance Technical Support (QATS) Program is operated by Shaw Environmental and Infrastructure, Inc. to provide EPA's Analytical Operations Center (AOC) with performance evaluation samples, reference materials, on-site laboratory auditing capabilities, data audits (including electronic media data audits), methods development, and other support services. The new QATS contract awarded in November 2000 required that the QATS Program become ISO 9000 certified. In a first for an EPA contractor, the QATS staff and management successfully transformed EPA's QA/R-2 type Quality Management Plan into a Quality Management System (QMS) that complies with the requirements of the internationally recognized ISO 9002 standard and achieved certification in the United States, Canada, and throughout Europe. The presentation describes how quality system elements of ISO 9002 were implemented on an already existing quality system. The psychological and organizational challenges of the culture change in QATS' day-to-day operations will be discussed for the benefit of other ISO 9000 aspirants.
A system to program projects to meet visual quality objectives
Fred L. Henley; Frank L. Hunsaker
1979-01-01
The U. S. Forest Service has established Visual Quality Objectives for National Forest lands and determined a method to ascertain the Visual Absorption Capability of those lands. Combining the two mapping inventories has allowed the Forest Service to retain the visual quality while managing natural resources.
40 CFR 35.1603 - Summary of clean lakes assistance program.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., and the State must certify that the lake project is consistent with the State Water Quality Management... quality, evaluate possible solutions to existing pollution problems, and recommend a feasible program to restore or preserve the quality of the lake. A Phase 2 cooperative agreement is to be used for...
40 CFR 35.917 - Facilities planning (step 1).
Code of Federal Regulations, 2010 CFR
2010-07-01
... projection totals and disaggregations in approved water quality management (WQM) plans. (See paragraph 8a(3... the most economical means of meeting established effluent and water quality goals while recognizing... WQM work program, or that award of the grant is necessary to achieve water quality goals of the Act...
40 CFR 35.917 - Facilities planning (step 1).
Code of Federal Regulations, 2011 CFR
2011-07-01
... projection totals and disaggregations in approved water quality management (WQM) plans. (See paragraph 8a(3... the most economical means of meeting established effluent and water quality goals while recognizing... WQM work program, or that award of the grant is necessary to achieve water quality goals of the Act...
Environmental Involvement. . . A Teacher's Guide (2nd Edition).
ERIC Educational Resources Information Center
1971
Presented in this teacher's guide are ideas and projects to help students develop an awareness and appreciation of their environment. Sharpening the senses is emphasized through activities dealing with water quality, sound qualities, and noise, air quality, solid waste control, and soil management. The text is divided into four levels roughly…
Total quality management in blood transfusion.
Smit-Sibinga, C T
2000-01-01
Quality management is an ongoing development resulting in consistency products and services and ever increasing customer satisfaction. The ultimum is Total Quality Management. Quality systems and quality management in transfusion medicine have gained considerable attention since the outbreak of the AIDS epidemic. Where product orientation has long been applied through quality control, Good Manufacturing Practice (GMP) principles were introduced, shifting the developments in the direction of process orientation. Globally, and particularly in the more industrialised world people and system orientation has come along with the introduction of the ISO9001 concept. Harmonisation and a degree of uniformity are needed to implement a universally applicable Quality System and related Quality Management. Where the American Association of Blood Banks (AABB) is the professional organisation with the most extensive experience in quality systems in blood transfusion, the European Union and the Council of Europe now are in the process to design a quality system and management applicable to a larger variety of countries, based on a hybrid of current GMP and ISO9001 principles. The International Federation of Red Cross and Red Crescent Societies has developed a more universally to implement Quality Manual, with a pilot project in Honduras. It is recommendable to harmonise the various designs and bring the approaches under one common denominator.
An Overview of Total Quality Management (TQM) practice in Construction Sector
NASA Astrophysics Data System (ADS)
Likita, A. J.; Zainun, N. Y.; Rahman, I. Abdul; Awal, A. S. M. Abdul; Alias, A. R.; Rahman, M. Q. Abdul; Ghazali, F. E. Mohamed
2018-04-01
In construction sector TQM can be termed as a philosophy which guides construction professionals on the proper execution of construction projects in terms of quality. The aim of this paper is to discuss on quality management practice in construction sector. This paper evaluated five previous researches and the findings were discussed to find a conclusion of TQM practise in construction sector. The study found that TQM had been successfully practice in construction sector at Saudi Arabia, India, US and South Africa. Application of Artificial Neural Network (ANN) help to improve the implementation of TQM in construction sector. In conclusion, quality management practices will give better control of processes in construction sector.
Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
GRYGIEL, M.L.
1998-10-08
Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less
Integrating automated support for a software management cycle into the TAME system
NASA Technical Reports Server (NTRS)
Sunazuka, Toshihiko; Basili, Victor R.
1989-01-01
Software managers are interested in the quantitative management of software quality, cost and progress. An integrated software management methodology, which can be applied throughout the software life cycle for any number purposes, is required. The TAME (Tailoring A Measurement Environment) methodology is based on the improvement paradigm and the goal/question/metric (GQM) paradigm. This methodology helps generate a software engineering process and measurement environment based on the project characteristics. The SQMAR (software quality measurement and assurance technology) is a software quality metric system and methodology applied to the development processes. It is based on the feed forward control principle. Quality target setting is carried out before the plan-do-check-action activities are performed. These methodologies are integrated to realize goal oriented measurement, process control and visual management. A metric setting procedure based on the GQM paradigm, a management system called the software management cycle (SMC), and its application to a case study based on NASA/SEL data are discussed. The expected effects of SMC are quality improvement, managerial cost reduction, accumulation and reuse of experience, and a highly visual management reporting system.
Quality assurance and the need to evaluate interventions and audit programme outcomes.
Zhao, Min; Vaartjes, Ilonca; Klipstein-Grobusch, Kerstin; Kotseva, Kornelia; Jennings, Catriona; Grobbee, Diederick E; Graham, Ian
2017-06-01
Evidence-based clinical guidelines provide standards for the provision of healthcare. However, these guidelines have been poorly implemented in daily practice. Clinical audit is a quality improvement tool to promote quality of care in daily practice and to improve outcomes through the systematic review of care delivery and implementation of changes. A major priority in the management of subjects with cardiovascular disease (CVD) management is secondary prevention by controlling cardiovascular risk factors and providing appropriate medical treatment. Clinical audits can be applied to monitor modifiable risk factors and evaluate quality improvements of CVD management in daily practice. Existing clinical audits have provided an overview of the burden of risk factors in subjects with CVD and reflect real-world risk factor recording and management. However, consistent and representative data from clinic audits are still insufficient to fully monitor quality improvement of CVD management. Data are lacking in particular from low- and middle-income countries, limiting the evaluation of CVD management quality by clinical audit projects in many settings. To support the development of clinical standards, monitor daily practice performance, and improve quality of care in CVD management at national and international levels, more widespread clinical audits are warranted.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Poncio, S.; Adkison, P.
Coating costs are escalating due to increased awareness of the environment and safety and health issues. Owners can reduce the overall cost of maintenance painting projects through the implementation of a total quality program. This program should encompass project pre-planning, evaluation of safety and quality assurance programs, and analysis of employee absenteeism and turnover. The information presented is a case history of one utility's experience managing a maintenance painting program during a five-year period.
A Methodology for Writing High Quality Requirement Specifications and for Evaluating Existing Ones
NASA Technical Reports Server (NTRS)
Rosenberg, Linda; Hammer, Theodore
1999-01-01
Requirements development and management have always been critical in the implementation of software systems-engineers are unable to build what analysts can not define. It is generally accepted that the earlier in the life cycle potential risks are identified the easier it is to eliminate or manage the conditions that introduce that risk. Problems that are not found until testing are approximately 14 times more costly to fix than if the problem was found in the requirement phase. The requirements specification, as the first tangible representation of the capability to be produced, establishes the basis for all of the project's engineering management and assurance functions. If the quality of the requirements specification is poor it can give rise to risks in all areas of the project. Recently, automated tools have become available to support requirements management. The use of these tools not only provides support in the definition and tracing of requirements, but it also opens the door to effective use of metrics in characterizing and assessing the quality of the requirement specifications.
A Methodology for Writing High Quality Requirements Specification and Evaluating Existing Ones
NASA Technical Reports Server (NTRS)
Rosenberg, Linda; Hammer, Theodore
1999-01-01
Requirements development and management have always been critical in the implementation of software systems; engineers are unable to build what analysts can't define. It is generally accepted that the earlier in the life cycle potential risks are identified the easier it is to eliminate or manage the conditions that introduce that risk. Problems that are not found until testing are approximately 14 times more costly to fix than if the problem was found in the requirement phase. The requirements specification, as the first tangible representation of the capability to be produced, establishes the basis for all of the project's engineering management and assurance functions. If the quality of the requirements specification is poor it can give rise to risks in all areas of the project. Recently, automated tools have become available to support requirements management. The use of these tools not only provides support in the definition and tracing of requirements, but it also opens the door to effective use of metrics in characterizing and assessing the quality of the requirement specifications.
How Configuration Management (CM) Can Help Project Teams To Innovate and Communicate
NASA Technical Reports Server (NTRS)
Cioletti, Louis
2009-01-01
Traditionally, CM is relegated to a support role in project management activities. CM s traditional functions of identification, change control, status accounting, and audits/verification are still necessary and play a vital role. However, this presentation proposes CM s role in a new and innovative manner that will significantly improve communication throughout the organization and, in turn, augment the project s success. CM s new role is elevated to the project management level, above the engineering or sub-project level in the Work Breakdown Structure (WBS), where it can more effectively accommodate changes, reduce corrective actions, and ensure that requirements are clear, concise, and valid, and that results conform to the requirements. By elevating CM s role in project management and orchestrating new measures, a new communication will emerge that will improve information integrity, structured baselines, interchangeability/traceability, metrics, conformance to standards, and standardize the best practices in the organization. Overall project performance (schedule, quality, and cost) can be no better than the ability to communicate requirements which, in turn, is no better than the CM process to communicate project decisions and the correct requirements.
Regional Traffic Incident Management Programs : Implementation Guide
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Air Quality Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM projects ...
Gershengorn, Hayley B; Kocher, Robert; Factor, Phillip
2014-03-01
The success of quality-improvement projects relies heavily on both project design and the metrics chosen to assess change. In Part II of this three-part American Thoracic Society Seminars series, we begin by describing methods for determining which data to collect, tools for data presentation, and strategies for data dissemination. As Avedis Donabedian detailed a half century ago, defining metrics in healthcare can be challenging; algorithmic determination of the best type of metric (outcome, process, or structure) can help intensive care unit (ICU) managers begin this process. Choosing appropriate graphical data displays (e.g., run charts) can prompt discussions about and promote quality improvement. Similarly, dashboards/scorecards are useful in presenting performance improvement data either publicly or privately in a visually appealing manner. To have compelling data to show, ICU managers must plan quality-improvement projects well. The second portion of this review details four quality-improvement tools-checklists, Six Sigma methodology, lean thinking, and Kaizen. Checklists have become commonplace in many ICUs to improve care quality; thinking about how to maximize their effectiveness is now of prime importance. Six Sigma methodology, lean thinking, and Kaizen are techniques that use multidisciplinary teams to organize thinking about process improvement, formalize change strategies, actualize initiatives, and measure progress. None originated within healthcare, but each has been used in the hospital environment with success. To conclude this part of the series, we demonstrate how to use these tools through an example of improving the timely administration of antibiotics to patients with sepsis.
E-service learning: A pedagogic innovation for healthcare management education.
Malvey, Donna M; Hamby, Eileen F; Fottler, Myron D
2006-01-01
This paper proposes an innovation in service learning that we identify as e-service learning. By adding the "e" to service learning, we create a service learning model that is dynamic, mediated by technology, and delivered online. This paper begins by examining service learning, which is a distinct learning concept. Service learning furnishes students with opportunities for applied learning through participation in projects and activities in community organizations. The authors then define and conceptualize e-service learning, including the anticipated outcomes of implementation such as enhanced access, quality, and cost effectiveness of healthcare management education. Because e-service learning is mediated by technology, we identify state of the art technologies that support e-service learning activities. In addition, possible e-service learning projects and activities that may be included in healthcare management courses such as finance, human resources, quality, service management/marketing and strategy are identified. Finally, opportunities for future research are suggested.
Innovative Stormwater Quality Tools by SARA for Holistic Watershed Master Planning
NASA Astrophysics Data System (ADS)
Thomas, S. M.; Su, Y. C.; Hummel, P. R.
2016-12-01
Stormwater management strategies such as Best Management Practices (BMP) and Low-Impact Development (LID) have increasingly gained attention in urban runoff control, becoming vital to holistic watershed master plans. These strategies can help address existing water quality impairments and support regulatory compliance, as well as guide planning and management of future development when substantial population growth and urbanization is projected to occur. However, past efforts have been limited to qualitative planning due to the lack of suitable tools to conduct quantitative assessment. The San Antonio River Authority (SARA), with the assistance of Lockwood, Andrews & Newnam, Inc. (LAN) and AQUA TERRA Consultants (a division of RESPEC), developed comprehensive hydrodynamic and water quality models using the Hydrological Simulation Program-FORTRAN (HSPF) for several urban watersheds in the San Antonio River Basin. These models enabled watershed management to look at water quality issues on a more refined temporal and spatial scale than the limited monitoring data. They also provided a means to locate and quantify potential water quality impairments and evaluate the effects of mitigation measures. To support the models, a suite of software tools were developed. including: 1) SARA Timeseries Utility Tool for managing and processing of large model timeseries files, 2) SARA Load Reduction Tool to determine load reductions needed to achieve screening levels for each modeled constituent on a sub-basin basis, and 3) SARA Enhanced BMP Tool to determine the optimal combination of BMP types and units needed to achieve the required load reductions. Using these SARA models and tools, water quality agencies and stormwater professionals can determine the optimal combinations of BMP/LID to accomplish their goals and save substantial stormwater infrastructure and management costs. The tools can also help regulators and permittees evaluate the feasibility of achieving compliance using BMP/LID. The project has gained national attention, being showcased in multiple newsletters, professional magazines, and conference presentations. The project also won the Texas American Council of Engineering Companies (ACEC) Gold Medal Award and the ACEC National Recognition Award in 2016.
The Empower project - a new way of assessing and monitoring test comparability and stability.
De Grande, Linde A C; Goossens, Kenneth; Van Uytfanghe, Katleen; Stöckl, Dietmar; Thienpont, Linda M
2015-07-01
Manufacturers and laboratories might benefit from using a modern integrated tool for quality management/assurance. The tool should not be confounded by commutability issues and focus on the intrinsic analytical quality and comparability of assays as performed in routine laboratories. In addition, it should enable monitoring of long-term stability of performance, with the possibility to quasi "real-time" remedial action. Therefore, we developed the "Empower" project. The project comprises four pillars: (i) master comparisons with panels of frozen single-donation samples, (ii) monitoring of patient percentiles and (iii) internal quality control data, and (iv) conceptual and statistical education about analytical quality. In the pillars described here (i and ii), state-of-the-art as well as biologically derived specifications are used. In the 2014 master comparisons survey, 125 laboratories forming 8 peer groups participated. It showed not only good intrinsic analytical quality of assays but also assay biases/non-comparability. Although laboratory performance was mostly satisfactory, sometimes huge between-laboratory differences were observed. In patient percentile monitoring, currently, 100 laboratories participate with 182 devices. Particularly, laboratories with a high daily throughput and low patient population variation show a stable moving median in time with good between-instrument concordance. Shifts/drifts due to lot changes are sometimes revealed. There is evidence that outpatient medians mirror the calibration set-points shown in the master comparisons. The Empower project gives manufacturers and laboratories a realistic view on assay quality/comparability as well as stability of performance and/or the reasons for increased variation. Therefore, it is a modern tool for quality management/assurance toward improved patient care.
34 CFR 642.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2011 CFR
2011-07-01
... looks for information that shows methods of evaluation that are appropriate for the project and, to the... operation for the project. (2) The Secretary looks for information that shows— (i) High quality in the design of the project; (ii) An effective plan of managment that insures proper and efficient...
The Feasibility of Determining Success Criteria for Educational Research and Development Projects.
ERIC Educational Resources Information Center
Ball, Rodney J.; Cook, Desmond L.
The determination of final success of educational research and development projects is an important problem for those concerned with project management and evaluation. The purpose of this study was twofold: (a) to determine if schedule, cost, quality/performance, follow-on work, spin-off benefits, and customer/client satisfaction were given a…
From shared care to disease management: key-influencing factors.
Eijkelberg, I M; Spreeuwenberg, C; Mur-Veeman, I M; Wolffenbuttel, B H
2001-01-01
In order to improve the quality of care of chronically ill patients the traditional boundaries between primary and secondary care are questioned. To demolish these boundaries so-called 'shared care' projects have been initiated in which different ways of substitution of care are applied. When these projects end, disease management may offer a solution to expand the achieved co-operation between primary and secondary care. Answering the question: What key factors influence the development and implementation of shared care projects from a management perspective and how are they linked? The theoretical framework is based on the concept of the learning organisation. Reference point is a multiple case study that finally becomes a single case study. Data are collected by means of triangulation. The studied cases concern two interrelated Dutch shared care projects for type 2 diabetic patients, that in the end proceed as one disease management project. In these cases the predominant key-influencing factors appear to be the project management, commitment and local context, respectively. The factor project management directly links the latter two, albeit managing both appear prerequisites to its success. In practice this implies managing the factors' interdependency by the application of change strategies and tactics in a committed and skillful way. Project management, as the most important and active key factor, is advised to cope with the interrelationships of the influencing factors in a gradually more fundamental way by using strategies and tactics that enable learning processes. Then small-scale shared care projects may change into a disease management network at a large scale, which may yield the future blueprint to proceed.
Furniss, Dominic; Curzon, Paul; Blandford, Ann
2018-06-01
Organisational competence in Human Factors and UX (user experience) has not been looked at before despite its relevance to project success. We define organisational competence as the collective competence of the individuals, bringing together their complementary abilities to deliver an outcome that is typically more than the sum of its parts. Twenty-two UX and Human Factors practitioners were interviewed about their project work in two contrasting domains: web design and safety-critical systems to explore organisational competences. Through doing a FRAM analysis, 29 functions and 6 main areas of competences were identified: the central project process; the process of learning about the problem; maintaining and developing client relations; staff development; evolving practices; and the management of documentation for audit and quality control. These dynamic and situated competences form a web of interactions. Managing competences is essential for project success. Implications for managing careers, project tactics and organisational strategy are discussed. Practitioner Summary: Organisational competences impact how routine and non-routine project work is performed, but these have received little attention in the literature. Six key areas of competences in Human Factors and UX project work were identified from practitioner interviews. Managing combinations of adaptive competences is important for developing careers, project tactics and organisational strategies.
De Belvis, Antonio Giulio; Specchia, Maria Lucia; Ferriero, Anna Maria; Capizzi, Silvio
2017-01-01
Risk management is a key tool in Clinical Governance. Our project aimed to define, share, apply and measure the impact of tools and methodologies for the continuous improvement of quality of care, especially in relation to the multi-disciplinary and integrated management of the hyperglycemic patient in hospital settings. A training project, coordinated by a scientific board of experts in diabetes and health management and an Expert Meeting with representatives of all the participating centers was launched in 2014. The project involved eight hospitals through the organization of meetings with five managers and 25 speakers, including diabetologists, internists, pharmacists and nurses. The analysis showed a wide variability in the adoption of tools and processes towards a comprehensive and coordinated management of hyperglycemic patients.
ENGINEERED STORMWATER MANAGEMENT FOR LOW-INCOME URBAN COMMUNITIES
This project addresses issues related to water quality and quantity in New Jersey’s urbanized watersheds and targets the need for improved environmental quality as a form of prosperity for the people in low-income urban communities.
PRE-QUALITY ASSURANCE PROJECT PLAN (QAPP) AGREEMENT (PQA) (HANDOUT)
The Land Remediation and Pollution Control Division (LRPCD) QA Manager strives to assist LRPCD researchers in developing functional planning documents for their research projects. As part of the planning process, several pieces of information are needed, including information re...
Software Process Improvement Journey: IBM Australia Application Management Services
2005-03-01
learned from its successes and mistakes and then applied that learning to the next project . 28 CMU/SEI-2005-TR...worldwide re- quirements for project management and quality; it was the organization’s staff members who played a part in the development of the ...environ- ment and that it involves personnel from a variety of areas, ideally not part of the group that developed the technology or process
78 FR 22604 - Privacy Act of 1974, as Amended; System of Records
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-16
...: Chief-Office of Strategic Systems Management, Chief-Office of Quality, Chief-Office of Order Management & Delivery Systems, and Chief-Office of Portfolio & Project Management. Bureau of Engraving and Printing...; System of Records AGENCY: Bureau of Engraving and Printing, Treasury. ACTION: Notice of systems of...
ERIC Educational Resources Information Center
Alrashid, Tareq M.; Barker, James A.; Christian, Brian S.; Cox, Steven C.; Rabne, Michael W.; Slotta, Elizabeth A.; Upthegrove, Luella R.
1998-01-01
Describes Case Western Reserve University's (CWRU's) digital library project that examines the networked delivery of full-text materials and high-quality images to provide students excellent supplemental instructional resources delivered directly to their dormitory rooms. Reviews intellectual property (IP) management requirements and describes…
In 1985, the Buzzards Bay Project was established with the goal of developing and implementing management recommendations that would preserve and protect water quality and living resources in Buzzards Bay. The development of the Buzzards Bay CCMP is an example of an emerging nati...
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESKO KF; BERRIOCHOA MV
2010-02-26
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
Quality-assurance plan for water-resources activities of the U.S. Geological Survey in Idaho
Packard, F.A.
1996-01-01
To ensure continued confidence in its products, the Water Resources Division of the U.S. Geological Survey implemented a policy that all its scientific work be performed in accordance with a centrally managed quality-assurance program. This report establishes and documents a formal policy for current (1995) quality assurance within the Idaho District of the U.S. Geological Survey. Quality assurance is formalized by describing district organization and operational responsibilities, documenting the district quality-assurance policies, and describing district functions. The districts conducts its work through offices in Boise, Idaho Falls, Twin Falls, Sandpoint, and at the Idaho National Engineering Laboratory. Data-collection programs and interpretive studies are conducted by two operating units, and operational and technical assistance is provided by three support units: (1) Administrative Services advisors provide guidance on various personnel issues and budget functions, (2) computer and reports advisors provide guidance in their fields, and (3) discipline specialists provide technical advice and assistance to the district and to chiefs of various projects. The district's quality-assurance plan is based on an overall policy that provides a framework for defining the precision and accuracy of collected data. The plan is supported by a series of quality-assurance policy statements that describe responsibilities for specific operations in the district's program. The operations are program planning; project planning; project implementation; review and remediation; data collection; equipment calibration and maintenance; data processing and storage; data analysis, synthesis, and interpretation; report preparation and processing; and training. Activities of the district are systematically conducted under a hierarchy of supervision an management that is designed to ensure conformance with Water Resources Division goals quality assurance. The district quality-assurance plan does not describe detailed technical activities that are commonly termed "quality-control procedures." Instead, it focuses on current policies, operations, and responsibilities that are implemented at the management level. Contents of the plan will be reviewed annually and updated as programs and operations change.
Management approach recommendations. Earth Observatory Satellite system definition study (EOS)
NASA Technical Reports Server (NTRS)
1974-01-01
Management analyses and tradeoffs were performed to determine the most cost effective management approach for the Earth Observatory Satellite (EOS) Phase C/D. The basic objectives of the management approach are identified. Some of the subjects considered are as follows: (1) contract startup phase, (2) project management control system, (3) configuration management, (4) quality control and reliability engineering requirements, and (5) the parts procurement program.
Forouhar, Amir; Hasankhani, Mahnoosh
2018-04-01
Urban decay is the process by which a historical city center, or an old part of a city, falls into decrepitude and faces serious problems. Urban management, therefore, implements renewal mega projects with the goal of physical and functional revitalization, retrieval of socioeconomic capacities, and improving of quality of life of residents. Ignoring the complexities of these large-scale interventions in the old and historical urban fabrics may lead to undesirable consequences, including an additional decline of quality of life. Thus, the present paper aims to assess the impact of renewal mega projects on residents' subjective quality of life, in the historical religious district of the holy city of Mashhad (Samen District). A combination of quantitative and qualitative methods of impact assessment, including questionnaires, semi-structured personal interviews, and direct observation, is used in this paper. The results yield that the Samen Renewal Project has significantly reduced the resident's subjective quality of life, due to its undesirable impacts on physical, socio-cultural, and economic environments.
Holve, Erin
2013-01-01
Multi-institutional research and quality improvement (QI) projects using electronic clinical data (ECD) hold great promise for improving quality of care and patient outcomes but typically require significant infrastructure investments both to initiate and maintain the project over its duration. Consequently, it is important for these projects to think holistically about sustainability to ensure their long-term success. Four “pillars” of sustainability are discussed based on the experiences of EDM Forum grantees and other research and QI networks. These include trust and value, governance, management, and financial and administrative support. Two “foundational considerations,” adaptive capacity and policy levers, are also discussed. PMID:25848557
The Troll HSE Risk Management System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiig, E.; Berthelsen, I.; Donovan, K.
1996-12-31
The Petroleum Act and Internal Control regulations in Norway lay down requirements for how HSE shall be Managed and documented. To comply with the Norwegian legislation the Troll Project has developed an HSE Risk Management System (RMS) structured around Hazards and Effects Management. The resulting quality, technical and operating integrity, and HSE performance are an endorsement of the power of RMS.
Quality control and quality assurance plan for bridge channel-stability assessments in Massachusetts
Parker, Gene W.; Pinson, Harlow
1993-01-01
A quality control and quality assurance plan has been implemented as part of the Massachusetts bridge scour and channel-stability assessment program. This program is being conducted by the U.S. Geological Survey, Massachusetts-Rhode Island District, in cooperation with the Massachusetts Highway Department. Project personnel training, data-integrity verification, and new data-management technologies are being utilized in the channel-stability assessment process to improve current data-collection and management techniques. An automated data-collection procedure has been implemented to standardize channel-stability assessments on a regular basis within the State. An object-oriented data structure and new image management tools are used to produce a data base enabling management of multiple data object classes. Data will be reviewed by assessors and data base managers before being merged into a master bridge-scour data base, which includes automated data-verification routines.
Requirement Metrics for Risk Identification
NASA Technical Reports Server (NTRS)
Hammer, Theodore; Huffman, Lenore; Wilson, William; Rosenberg, Linda; Hyatt, Lawrence
1996-01-01
The Software Assurance Technology Center (SATC) is part of the Office of Mission Assurance of the Goddard Space Flight Center (GSFC). The SATC's mission is to assist National Aeronautics and Space Administration (NASA) projects to improve the quality of software which they acquire or develop. The SATC's efforts are currently focused on the development and use of metric methodologies and tools that identify and assess risks associated with software performance and scheduled delivery. This starts at the requirements phase, where the SATC, in conjunction with software projects at GSFC and other NASA centers is working to identify tools and metric methodologies to assist project managers in identifying and mitigating risks. This paper discusses requirement metrics currently being used at NASA in a collaborative effort between the SATC and the Quality Assurance Office at GSFC to utilize the information available through the application of requirements management tools.
Assessing air quality impacts of managed lanes.
DOT National Transportation Integrated Search
2010-12-01
Impacts on transit bus performance and air quality were investigated for a case study high-occupancy / toll (HOT) lane project on a corridor of I-95 near Miami. Trends in air pollutant concentration monitoring data in the study area first were analyz...
Assessing air quality impacts of managed lanes
DOT National Transportation Integrated Search
2010-12-01
Impacts on transit bus performance and air quality were investigated for a case study high-occupancy / : toll (HOT) lane project on a corridor of I-95 near Miami. Trends in air pollutant concentration : monitoring data in the study area first were an...
Assessing air quality impacts of managed lanes : summary.
DOT National Transportation Integrated Search
2010-01-01
Researchers at the National Center for Transit Research, University of South Florida, recently studied a segment of I-95 between Ft. Lauderdale and Miami to investigate the impacts of high-occupancy/toll (HOT) lanes on air quality. The project simula...
Yourkavitch, Jennifer; Zalisk, Kirsten; Prosnitz, Debra; Luhanga, Misheck; Nsona, Humphreys
2016-11-01
The World Health Organization contracted annual data quality assessments of Rapid Access Expansion (RAcE) projects to review integrated community case management (iCCM) data quality and the monitoring and evaluation (M&E) system for iCCM, and to suggest ways to improve data quality. The first RAcE data quality assessment was conducted in Malawi in January 2014 and we present findings pertaining to data from the health management information system at the community, facility and other sub-national levels because RAcE grantees rely on that for most of their monitoring data. We randomly selected 10 health facilities (10% of eligible facilities) from the four RAcE project districts, and collected quantitative data with an adapted and comprehensive tool that included an assessment of Malawi's M&E system for iCCM data and a data verification exercise that traced selected indicators through the reporting system. We rated the iCCM M&E system across five function areas based on interviews and observations, and calculated verification ratios for each data reporting level. We also conducted key informant interviews with Health Surveillance Assistants and facility, district and central Ministry of Health staff. Scores show a high-functioning M&E system for iCCM with some deficiencies in data management processes. The system lacks quality controls, including data entry verification, a protocol for addressing errors, and written procedures for data collection, entry, analysis and management. Data availability was generally high except for supervision data. The data verification process identified gaps in completeness and consistency, particularly in Health Surveillance Assistants' record keeping. Staff at all levels would like more training in data management. This data quality assessment illuminates where an otherwise strong M&E system for iCCM fails to ensure some aspects of data quality. Prioritizing data management with documented protocols, additional training and approaches to create efficient supervision practices may improve iCCM data quality. © The Author 2016. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.
Distributed Information System Development: Review of Some Management Issues
NASA Astrophysics Data System (ADS)
Mishra, Deepti; Mishra, Alok
Due to the proliferation of the Internet and globalization, distributed information system development is becoming popular. In this paper we have reviewed some significant management issues like process management, project management, requirements management and knowledge management issues which have received much attention in distributed development perspective. In this literature review we found that areas like quality and risk management issues could get only scant attention in distributed information system development.
Thomas, Nicola; Gallagher, Hugh; Jain, Neerja
2014-01-01
Chronic kidney disease (CKD) stages 3 to 5, affects 6-7% of the adult population and is an important risk factor for both advanced kidney disease and cardiovascular disease. This paper describes a quality improvement project that aimed to establish consistent implementation of best practice in people with stage 3-5 kidney disease who were managed in primary care. The intervention was a Care Bundle for CKD. The bundle included three evidence-based, high impact interventions based on National Institute for Care Excellence (NICE, 2008) guidance, with an additional and novel self-management element. 29 GP Practices in England and Wales began the study. They undertook training in clinical management of CKD and in facilitation of self-management, with the self-management content designed and led by patients. Practices were asked to report baseline and then monthly outcome data extracted from practice computer systems. The project team provided implementation and ongoing quality improvement support for participating Practices. Ten Practices dropped out of the study following the training. Data submissions were incomplete in six Practices who continued to apply the care bundle. At the project end, a decision was taken by the study team to perform the final analysis on those thirteen Practices which completed the project and submitted at least six sets of monthly Practice-level outcome data. In these Practices the Care Bundle was applied to under 20% of the registered CKD stage 3 to 5 population in 5 Practices, 20-29% in 3 Practices, 30-49% in 2 Practices and ≥50% in 3 Practices (998 patients in total). Of these, 671 patients (75%) agreed to the self-management component of the intervention. The reliability (at project end) in those who received the Bundle was 100%. The Bundle was applied to an additional 315 patients in the six Practices who completed the project but did not submit regular practice-level monthly data. In the thirteen remaining Practices, the achievement of NICE (2008) blood pressure targets at the start of the project was 74.8% in people with CKD stage 3-5 and no diabetes and 48% in people with CKD stage 3-5 and diabetes. At the project end these figures in the same Practices were 76.7% and 49.2% respectively. These improvements were achieved in spite of Practices increasing their recording of prevalence rate (that is, identifying and recording more patients with CKD on the Practice CKD Register). In conclusion, a care bundle can be implemented in primary care. However, maintaining engagement with primary care health care professionals and maximising exposure to an intervention in patients seen infrequently are significant challenges to generalisation and sustainability.
40 CFR 35.1620-2 - Contents of applications.
Code of Federal Regulations, 2010 CFR
2010-07-01
... certification that the project is consistent with State Water Quality Management work program (see § 35.1513 of... past trends and current water quality of the lake. (E) A description of the type and amount of public... due to degraded water quality. Indicate the cause of the impairment, such as algae, vascular aquatic...
Principals' Perceptions of "Quality" in Mauritian Schools Using the Baldrige Framework
ERIC Educational Resources Information Center
Ah-Teck, Jean Claude; Starr, Karen
2013-01-01
Purpose: This article aims to report the findings of a research project exploring Mauritian principals' receptivity to the main tenets inherent in Total Quality Management (TQM). The Malcolm Baldrige National Quality Award (MBNQA) framework (aligned with, and an outcome of, the TQM movement) provides a set of criteria for organizational quality…
40 CFR 35.1620-2 - Contents of applications.
Code of Federal Regulations, 2011 CFR
2011-07-01
... certification that the project is consistent with State Water Quality Management work program (see § 35.1513 of... past trends and current water quality of the lake. (E) A description of the type and amount of public... due to degraded water quality. Indicate the cause of the impairment, such as algae, vascular aquatic...
ERIC Educational Resources Information Center
Raiford, Regina
2001-01-01
Discusses the relationship between indoor air quality and productivity and a three-year research project to measure productivity within an educational setting. Also discusses research showing the impact of good indoor air quality on increasing productivity. Ten ways to manage asthma in a school environment are highlighted. (GR)
Air Sensor Kit Performance Testing and Pollutant Mapping Supports Community Air Monitoring Project
EPA is collaborating on a research project with the South Coast Air Quality Management District in Diamond Bar, Calif. to gain an enhanced understanding of fine particulate matter (PM2.5) and ozone concentrations across the study area.
Accountability to Public Stakeholders in Watershed-Based Restoration
There is an increasing push at the federal, state, and local levels for watershed-based conservation projects. These projects work to address water quality issues in degraded waterways through the implementation of a suite of best management practices on land throughout a watersh...
Sather, Mike R; Parsons, Sherry; Boardman, Kathy D; Warren, Stuart R; Davis-Karim, Anne; Griffin, Kevin; Betterton, Jane A; Jones, Mark S; Johnson, Stanley H; Vertrees, Julia E; Hickey, Jan H; Salazar, Thelma P; Huang, Grant D
2018-03-01
This paper presents the quality journey taken by a Federal organization over more than 20 years. These efforts have resulted in the implementation of a Total Integrated Performance Excellence System (TIPES) that combines key principles and practices of established quality systems. The Center has progressively integrated quality system frameworks including the Malcom Baldrige National Quality Award (MBNQA) Framework and Criteria for Performance Excellence, ISO 9001, and the Organizational Project Management Maturity Model (OPM3), as well as supplemental quality systems of ISO 15378 (packaging for medicinal products) and ISO 21500 (guide to project management) to systematically improve all areas of operations. These frameworks were selected for applicability to Center processes and systems, consistency and reinforcement of complimentary approaches, and international acceptance. External validations include the MBNQA, the highest quality award in the US, continued registration and conformance to ISO standards and guidelines, and multiple VA and state awards. With a focus on a holistic approach to quality involving processes, systems and personnel, this paper presents activities and lessons that were critical to building TIPES and establishing the quality environment for conducting clinical research in support of Veterans and national health care.
A means to an end: a web-based client management system in palliative care.
O'Connor, Margaret; Erwin, Trudy; Dawson, Linda
2009-03-01
Home-based palliative care (hospice) services require comprehensive and fully integrated information systems to develop and manage the various aspects of their business, incorporating client data and management information. These systems assist in maintaining the quality of client care as well as improved management efficiencies. This article reports on a large not-for-profit home-based palliative care service in Australia, which embarked on a project to develop an electronic data management system specifically designed to meet the needs of the palliative care sector. This web-based client information management system represents a joint venture between the organization and a commercial company and has been a very successful project.
Valoppi, Laura
2018-04-02
Executive SummaryThe South Bay Salt Pond Restoration Project (Project) is one of the largest restoration efforts in the United States. It is located in South San Francisco Bay of California. It is unique not only for its size—more than 15,000 acres—but also for its location adjacent to one of the nation’s largest urban areas, home to more than 4 million people (Alameda, Santa Clara, and San Mateo Counties). The Project is intended to restore and enhance wetlands in South San Francisco Bay while providing for flood management, wildlife-oriented public access, and recreation. Restoration goals of the project are to provide a mosaic of saltmarsh habitat to benefit marsh species and managed ponds to benefit waterbirds, throughout 3 complexes and 54 former salt ponds.Although much is known about the project area, significant uncertainties remain with a project of this geographic and temporal scale of an estimated 50 years to complete the restoration. For example, in order to convert anywhere from 50 to 90 percent of the existing managed ponds to saltmarsh habitat, conservation managers first enhance the habitat of managed ponds in order to increase use by waterbirds, and provide migratory, wintering, and nesting habitat for more than 90 species of waterbirds. Project managers have concluded that the best way to address these uncertainties is to carefully implement the project in phases and learn from the outcome of each phase. The Adaptive Management Plan (AMP) identifies specific restoration targets for multiple aspects of the Project and defines triggers that would necessitate some type of management action if a particular aspect is trending negatively. U.S. Geological Survey (USGS) biologist Laura Valoppi served as the project Lead Scientist and oversaw implementation of the AMP in coordination with other members of the Project Management Team (PMT), comprised of representatives from the California State Coastal Conservancy, California Department of Fish and Wildlife, the Santa Clara Valley Water District, the U.S. Army Corps of Engineers, and the U.S. Fish and Wildlife Service.To implement the AMP, the PMT have selected and funded applied studies and monitoring projects to address key uncertainties. This information is used by the PMT to make decisions about current management of the project area and future restoration actions in order to meet project.This document summarizes the major scientific findings from studies conducted from 2009 to 2016, as part of the science program that was conducted in conjunction with Phase 1 restoration and management actions. Additionally, this report summarizes the management response to the study results under the guidance of the AMP framework and provides a list of suggested studies to be conducted in “Phase 2–A scorecard summarizing the Project’s progress toward meeting the AMP goals for a range of Project objectives.” The scoring to date indicates that the Project is meeting or exceeding expectations for sediment accretion and western snowy plover (Charadrius alexandrinus nivosus) recovery. There is uncertainty with respect to objectives for California gulls (Larus californicus), California least tern (Sternula antillarum), steelhead trout (Oncorhynchus mykiss), and regulatory water quality objectives. Water quality and algal blooms, specifically of the managed ponds, is indicated as trending negative. However, the vast majority of objectives are trending positive, including increased abundance for a number of bird guilds, increasing marsh habitat, maintenance of mudflats, visitor experience, estuarine fish numbers, and special-status marsh species numbers.
Delin, G.N.; Landon, M.K.; Lamb, J.A.; Anderson, J.L.
1994-01-01
The Minnesota Management Systems Evaluation Area project is part of a multi-scale, inter-agency initiative to evaluate the effects of agricultural management systems on water quality in the midwest corn belt. The research area is located in the Anoka Sand Plain about 5 kilometers southwest of Princeton, Minnesota. The ground-water-quality monitoring network within and immediately surrounding the research area consists of 29 observation wells and 22 multiport wells. Thirteen observation wells are also located outside the research area. The primary objectives of research by the U.S. Geological Survey at the Princeton Management Systems Evaluation Area are to: (1) determine the relation of the spatial and temporal distribution of agricultural chemicals in ground water to recharge, topography, and subsurface heterogeneities; and (2) determine the effects of the modified and prevailing farming systems on ground-water quality. This report presents geologic logs and water-quality data used to characterize the Princeton Management Systems Evaluation Area.
Chip Design Process Optimization Based on Design Quality Assessment
NASA Astrophysics Data System (ADS)
Häusler, Stefan; Blaschke, Jana; Sebeke, Christian; Rosenstiel, Wolfgang; Hahn, Axel
2010-06-01
Nowadays, the managing of product development projects is increasingly challenging. Especially the IC design of ASICs with both analog and digital components (mixed-signal design) is becoming more and more complex, while the time-to-market window narrows at the same time. Still, high quality standards must be fulfilled. Projects and their status are becoming less transparent due to this complexity. This makes the planning and execution of projects rather difficult. Therefore, there is a need for efficient project control. A main challenge is the objective evaluation of the current development status. Are all requirements successfully verified? Are all intermediate goals achieved? Companies often develop special solutions that are not reusable in other projects. This makes the quality measurement process itself less efficient and produces too much overhead. The method proposed in this paper is a contribution to solve these issues. It is applied at a German design house for analog mixed-signal IC design. This paper presents the results of a case study and introduces an optimized project scheduling on the basis of quality assessment results.
Using the integrated nurse leadership program to reduce sepsis mortality.
Kliger, Julie; Singer, Sara J; Hoffman, Frank H
2015-06-01
The Integrated Nurse Leadership Program (INLP) is a collaborative improvement model focused on developing practical leadership skills of nurses and other frontline clinicians to lead quality improvement efforts. Sepsis is a major challenge to treat because it arises unpredictably and can progress rapidly. Nine San Francisco Bay Area hospitals participated in a 22-month INLP Sepsis Mortality Reduction Project to improve sepsis detection and management. The INLP focused on developing leadership and process improvement skills of nurses and other frontline clinicians. Teams of trained clinicians then implemented three strategies to improve early identification and timely treatment of sepsis: (1) sepsis screening of all patients, with diagnostic testing according to protocol; (2) timely treatment on the basis of key elements of Early Goal-Directed Therapy (EGDT); and (3) ongoing data review. Each hospital agreed to pursue the goal of reducing sepsis mortality by 15% by the end of the project. In the data collection period (baseline, July-December 2008 and project completion, January-June 2011), team members showed strong improvement in perceived leadership skills, team effectiveness, and ability to improve care quality. During this period, sepsis mortality for eight of the participating hospitals (Hospital 9 joined the project six months after it began) decreased by 43.7%-from 28% in the baseline period to 16% at project completion. Sepsis mortality rates trended downward for all hospitals, significantly decreasing (p<.05 at one hospital, p<.01 for four hospitals). In addition to improvement in safety culture and management of septic patients, hospitals participating in the INLP Sepsis Mortality Reduction Project achieved reductions in sepsis mortality during the study period and sustained reductions for more than one year later. The INLP model can be readily applied beyond sepsis management and mortality to other quality problems.
Innovations in projecting emissions for air quality modeling ...
Air quality modeling is used in setting air quality standards and in evaluating their costs and benefits. Historically, modeling applications have projected emissions and the resulting air quality only 5 to 10 years into the future. Recognition that the choice of air quality management strategy has climate change implications is encouraging longer modeling time horizons. However, for multi-decadal time horizons, many questions about future conditions arise. For example, will current population, economic, and land use trends continue, or will we see shifts that may alter the spatial and temporal pattern of emissions? Similarly, will technologies such as building-integrated solar photovoltaics, battery storage, electric vehicles, and CO2 capture emerge as disruptive technologies - shifting how we produce and use energy - or will these technologies achieve only niche markets and have little impact? These are some of the questions that are being evaluated by researchers within the U.S. EPA’s Office of Research and Development. In this presentation, Dr. Loughlin will describe a range of analytical approaches that are being explored. These include: (i) the development of alternative scenarios of the future that can be used to evaluate candidate management strategies over wide-ranging conditions, (ii) the application of energy system models to project emissions decades into the future and to assess the environmental implications of new technologies, (iii) and methodo
Disease Management: The Need for a Focus on Broader Self-Management Abilities and Quality of Life
Nieboer, Anna Petra
2015-01-01
Abstract The study objective was to investigate long-term effects of disease management programs (DMPs) on (1) health behaviors (smoking, physical exercise); (2) self-management abilities (self-efficacy, investment behavior, initiative taking); and (3) physical and mental quality of life among chronically ill patients. The study also examined whether (changes in) health behaviors and self-management abilities predicted quality of life. Questionnaires were sent to all 5076 patients participating in 18 Dutch DMPs in 2010 (T0; 2676 [53%] respondents). Two years later (T1), questionnaires were sent to 4350 patients still participating in DMPs (1722 [40%] respondents). Structured interviews were held with the 18 DMP project leaders. DMP implementation improved patients' health behavior and physical quality of life, but mental quality of life and self-management abilities declined over time. Changes in patients' investment behavior predicted physical quality of life at T1 (P<.001); physical activity, investment behavior (both P<.05), and self-efficacy (P<.01) at T0, and changes in self-efficacy and investment behavior (both P<.001) predicted patients' mental quality of life at T1. The long-term benefits of these DMPs include successful improvement of chronically ill patients' health behaviors and physical quality of life. However, these programs were not able to improve or maintain broader self-management abilities or mental quality of life, highlighting the need to focus on these abilities and overall quality of life. As coproducers of care, patients should be stimulated and enabled to manage their health and quality of life. (Population Health Management 2015;18:246–255) PMID:25607246
NASA Astrophysics Data System (ADS)
Pukite, I.; Grekis, A.; Geipele, I.; Zeltins, N.
2017-08-01
In March 2016, the Latvian government approved a new support program for increasing energy efficiency in residential apartment buildings. For the support of renovation of apartment buildings in the period from 2016 to 2023, 166 470 588 EUR will be available. Different persons, such as energy auditors, designers, architects, project managers and builders, will be involved in the process of planning, development and implementation of building renovation. At the development stage of the building renovation project, special attention should be devoted to the first stage - energy audit and technical project development. The problem arises due to the fact that each of these individuals, during the development of technical building documentation, does not work as a completely unified system. The implementation of construction project planning and organisational management system is one of the most important factors to guarantee that the quality of building renovation project is ensured in accordance with the laws and regulatory standards. The paper studies mutual cooperation, professionalism and the role of information feedback of personnel involved in the planning stage of building renovation, which is an essential prerequisite for the renovation process in order to achieve high quality of work and reduce the energy performance indicator. The present research includes the analysis of different technical solutions and their impact on energy efficiency. Mutual harmonisation of technical specifications is also investigated.
Aveling, Emma-Louise; Zegeye, Desalegn Tegabu; Silverman, Michael
2016-08-17
Access to safe surgical care represents a critical gap in healthcare delivery and development in many low- and middle-income countries, including Ethiopia. Quality improvement (QI) initiatives at hospital level may contribute to closing this gap. Many such quality improvement initiatives are carried out through international health partnerships. Better understanding of how to optimise quality improvement in low-income settings is needed, including through partnership-based approaches. Drawing on a process evaluation of an intervention to improve surgical services in an Ethiopian hospital, this paper offers lessons to help meet this need. We conducted a qualitative process evaluation of a quality improvement project which aimed to improve access to surgical services in an Ethiopian referral hospital through better management. Data was collected longitudinally and included: 66 in-depth interviews with surgical staff and project team members; observation (135 h) in the surgery department and of project meetings; project-related documentation. Thematic analysis, guided by theoretical constructs, focused on identifying obstacles to implementation. The project largely failed to achieve its goals. Key barriers related to project design, partnership working and the implementation context, and included: confusion over project objectives and project and partner roles and responsibilities; logistical challenges concerning overseas visits; difficulties in communication; gaps between the time and authority team members had and that needed to implement and engage other staff; limited strategies for addressing adaptive-as opposed to technical-challenges; effects of hierarchy and resource scarcity on QI efforts. While many of the obstacles identified are common to diverse settings, our findings highlight ways in which some features of low-income country contexts amplify these common challenges. We identify lessons for optimising the design and planning of quality improvement interventions within such challenging healthcare contexts, with specific reference to international partnership-based approaches. These include: the need for a funded lead-in phase to clarify and agree goals, roles, mutual expectations and communication strategies; explicitly incorporating adaptive, as well as technical, solutions; transparent management of resources and opportunities; leadership which takes account of both formal and informal power structures; and articulating links between project goals and wider organisational interests.
O'Donnell, T. K.; Galat, D.L.
2007-01-01
The Upper Mississippi River is characterized by a series of locks and dams, shallow impoundments, and thousands of river channelization structures that facilitate commercial navigation between Minneapolis, Minnesota, and Cairo, Illinois. Agriculture and urban development over the past 200 years have degraded water quality and increased the rate of sediment and nutrient delivery to surface waters. River enhancement has become an important management tool employed to address causes and effects of surface water degradation and river modification in the Upper Mississippi River Basin. We report information on individual river enhancement projects and contrast project densities, goals, activities, monitoring, and cost between commercially non-navigated and navigated rivers (Non-navigated and Navigated Rivers, respectively). The total number of river enhancement projects collected during this effort was 62,108. Cost of all projects reporting spending between 1972 and 2006 was about US$1.6 billion. Water quality management was the most cited project goal within the basin. Other important goals in Navigated Rivers included in-stream habitat improvement and flow modification. Most projects collected for Non-navigated Rivers and their watersheds originated from the U.S. Department of Agriculture (USDA). The U.S. Army Corps of Engineers and the USDA were important sources for projects in Navigated Rivers. Collaborative efforts between agencies that implement projects in Non-navigated and Navigated Rivers may be needed to more effectively address river impairment. However, the current state of data sources tracking river enhancement projects deters efficient and broad-scale integration. ?? Journal compilation ?? 2007 Society for Ecological Restoration International.
From shared care to disease management: key-influencing factors
Eijkelberg, Irmgard M.J.G.; Spreeuwenberg, Cor; Mur-Veeman, Ingrid M.; Wolffenbuttel, Bruce H.R.
2001-01-01
Abstract Background In order to improve the quality of care of chronically ill patients the traditional boundaries between primary and secondary care are questioned. To demolish these boundaries so-called ‘shared care’ projects have been initiated in which different ways of substitution of care are applied. When these projects end, disease management may offer a solution to expand the achieved co-operation between primary and secondary care. Objective Answering the question: What key factors influence the development and implementation of shared care projects from a management perspective and how are they linked? Theory The theoretical framework is based on the concept of the learning organisation. Design Reference point is a multiple case study that finally becomes a single case study. Data are collected by means of triangulation. The studied cases concern two interrelated Dutch shared care projects for type 2 diabetic patients, that in the end proceed as one disease management project. Results In these cases the predominant key-influencing factors appear to be the project management, commitment and local context, respectively. The factor project management directly links the latter two, albeit managing both appear prerequisites to its success. In practice this implies managing the factors' interdependency by the application of change strategies and tactics in a committed and skilful way. Conclusion Project management, as the most important and active key factor, is advised to cope with the interrelationships of the influencing factors in a gradually more fundamental way by using strategies and tactics that enable learning processes. Then small-scale shared care projects may change into a disease management network at a large scale, which may yield the future blueprint to proceed. PMID:16896415
[Internal audit--the foundation of healthcare quality management in health care].
Smiianov, V A
2014-01-01
The paper proved the need for internal audit as the basis for quality control of medical care in a health facility, developed the project milestones and explains what needs to be taken into account at every stage during its implementation.
40 CFR 1.45 - Office of Research and Development.
Code of Federal Regulations, 2013 CFR
2013-07-01
... the fate, transport, and environmental levels which may result in human exposure and exposure of nonhuman components of the environment, resulting from the discharge of pollutants, singly or in...; managing grant projects; and ensuring project quality and optimum dissemination of results. The OER is...
40 CFR 1.45 - Office of Research and Development.
Code of Federal Regulations, 2012 CFR
2012-07-01
... the fate, transport, and environmental levels which may result in human exposure and exposure of nonhuman components of the environment, resulting from the discharge of pollutants, singly or in...; managing grant projects; and ensuring project quality and optimum dissemination of results. The OER is...
40 CFR 1.45 - Office of Research and Development.
Code of Federal Regulations, 2014 CFR
2014-07-01
... the fate, transport, and environmental levels which may result in human exposure and exposure of nonhuman components of the environment, resulting from the discharge of pollutants, singly or in...; managing grant projects; and ensuring project quality and optimum dissemination of results. The OER is...
40 CFR 1.45 - Office of Research and Development.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the fate, transport, and environmental levels which may result in human exposure and exposure of nonhuman components of the environment, resulting from the discharge of pollutants, singly or in...; managing grant projects; and ensuring project quality and optimum dissemination of results. The OER is...
40 CFR 1.45 - Office of Research and Development.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the fate, transport, and environmental levels which may result in human exposure and exposure of nonhuman components of the environment, resulting from the discharge of pollutants, singly or in...; managing grant projects; and ensuring project quality and optimum dissemination of results. The OER is...
Prototype smart phone application to report water quality conditions.
The EPA Pathfinder Innovation Project has identified that environmental managers are typically limited in their time and ability to use and handle satellite remote sensing data due to the file size and complexity in the data structures. Therefore this project developed the Mobil...
Baltimore applications project
NASA Technical Reports Server (NTRS)
Golden, T. S.; Yaffee, P.
1979-01-01
An update is presented for the following projects: (1) asphalt pavement recycling; (2) data collection platform/water quality monitoring; (3) digital emergency traffic routing; (4) fire department communications and dispatch system; (5) health department management information system; (6) hazardous materials; (7) coal gasification; and (8) emergency vehicle proximity sensing.
Environmental surveillance master sampling schedule
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bisping, L.E.
This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of themore » onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.« less
Parkhurst, David L.; Christenson, Scott C.; Schlottmann, Jamie L.
1989-01-01
Beginning in 1986, the Congress annually has appropriated funds for the U.S. Geological Survey to test and refine concepts for a National Water-Quality Assessment (NAWQA) Program. The long-term goals of a full-scale program would be to:Provide a nationally consistent description of current water-quality conditions for a large part of the Nation's surface- and ground-water resources;Define long-term trends (or lack of trends) in water quality; andIdentify, describe, and explain, as possible, the major factors that affect the observed water-quality conditions and trends.The results of the NAWQA Program will be made available to water managers, policy makers, and the public, and will provide an improved scientific basis for evaluating the effectiveness of water-quality management programs.At present (1988), the assessment program is in a pilot phase in seven project areas throughout the country that represent diverse hydrologic environments and water-quality conditions. The Central Oklahoma aquifer project is one of three pilot ground-water projects. One of the initial activities performed by each pilot project was to compile, screen, and interpret the large amount of water-quality data available within each study unit.The purpose of this report is to assess the water quality of the Central Oklahoma aquifer using the information available through 1987. The scope of the work includes compiling data from Federal, State, and local agencies; evaluating the suitability of the information for conducting a regional water-quality assessment; mapping regional variations in major-ion chemistry; calculating summary statistics of the available water-quality data; producing maps to show the location and number of samples that exceeded water-quality standards; and performing contingency-table analyses to determine the relation of geologic unit and depth to the occurrence of chemical constituents that exceed water-quality standards. This report provides an initial description of water-quality conditions in the Central Oklahoma aquifer study unit. No attempt was made in this report to determine the causes for regional variations in major-ion chemistry or to examine the reasons that some chemical constituents exceed water-quality standards.
Streamlining the Online Course Development Process by Using Project Management Tools
ERIC Educational Resources Information Center
Abdous, M'hammed; He, Wu
2008-01-01
Managing the design and production of online courses is challenging. Insufficient instructional design and inefficient management often lead to issues such as poor course quality and course delivery delays. In an effort to facilitate, streamline, and improve the overall design and production of online courses, this article discusses how we…
Fabbruzzo-Cota, Christina; Frecea, Monica; Kozell, Kathryn; Pere, Katalin; Thompson, Tamara; Tjan Thomas, Julie; Wong, Angela
2016-01-01
The purpose of this clinical nurse specialist-led interprofessional quality improvement project was to reduce hospital-acquired pressure ulcers (HAPUs) using evidence-based practice. Hospital-acquired pressure ulcers (PUs) have been linked to morbidity, poor quality of life, and increasing costs. Pressure ulcer prevention and management remain a challenge for interprofessional teams in acute care settings. Hospital-acquired PU rate is a critical nursing quality indicator for healthcare organizations and ties directly with Mount Sinai Hospital's (MSH's) mission and vision, which mandates providing the highest quality care to patients and families. This quality improvement project, guided by the Donabedian model, was based on the Registered Nurses' Association of Ontario Best Practice Guideline Risk Assessment & Prevention of Pressure Ulcers. A working group was established to promote evidence-based practice for PU prevention. Initiatives such as documentation standardization, development of staff education and patient and family educational resources, initiation of a hospital-wide inventory for support surfaces, and procurement of equipment were implemented to improve PU prevention and management across the organization. An 80% decrease in HAPUs has been achieved since the implementation of best practices by the Best Practice Guideline Pressure Ulcer working group. The implementation of PU prevention strategies led to a reduction in HAPU rates. The working group will continue to work on building interprofessional awareness and collaboration in order to prevent HAPUs and promote an organizational culture that supports staff development, teamwork and communication. This quality improvement project is a successful example of an interprofessional clinical nurse specialist-led initiative that impacts patient/family and organization outcomes through the identification and implementation of evidence-based nursing practice.
Robert L. Ryan
2005-01-01
A series of syntheses were commissioned by the USDA Forest Service to aid in fuels mitigation project planning. This synthesis focuses on research addressing aesthetic considerations of fuels management. A general finding is that fuels management activities can contribute to the visual quality of a landscape. Topics covered in the synthesis include research findings on...
The Determination of Navy Family Housing Requirements
1992-04-01
for greater precision and responsiveness, closer scrutiny of Navy family housing programs, and internal initiatives relating to quality management ...DETERMINATION SYSTEM Overview For almost 20 years, the Navy has used a semiautomated system to project family housing requirements. This process is managed ... Family Housing Management Institute (FHMI) materials, and management specifications maintained by NAVFAC and FACSO. FINDINGS Theory We believe that the
Managing laboratory automation in a changing pharmaceutical industry
Rutherford, Michael L.
1995-01-01
The health care reform movement in the USA and increased requirements by regulatory agencies continue to have a major impact on the pharmaceutical industry and the laboratory. Laboratory management is expected to improve effciency by providing more analytical results at a lower cost, increasing customer service, reducing cycle time, while ensuring accurate results and more effective use of their staff. To achieve these expectations, many laboratories are using robotics and automated work stations. Establishing automated systems presents many challenges for laboratory management, including project and hardware selection, budget justification, implementation, validation, training, and support. To address these management challenges, the rationale for project selection and implementation, the obstacles encountered, project outcome, and learning points for several automated systems recently implemented in the Quality Control Laboratories at Eli Lilly are presented. PMID:18925014
Linking Six Sigma to simulation: a new roadmap to improve the quality of patient care.
Celano, Giovanni; Costa, Antonio; Fichera, Sergio; Tringali, Giuseppe
2012-01-01
Improving the quality of patient care is a challenge that calls for a multidisciplinary approach, embedding a broad spectrum of knowledge and involving healthcare professionals from diverse backgrounds. The purpose of this paper is to present an innovative approach that implements discrete-event simulation (DES) as a decision-supporting tool in the management of Six Sigma quality improvement projects. A roadmap is designed to assist quality practitioners and health care professionals in the design and successful implementation of simulation models within the define-measure-analyse-design-verify (DMADV) or define-measure-analyse-improve-control (DMAIC) Six Sigma procedures. A case regarding the reorganisation of the flow of emergency patients affected by vertigo symptoms was developed in a large town hospital as a preliminary test of the roadmap. The positive feedback from professionals carrying out the project looks promising and encourages further roadmap testing in other clinical settings. The roadmap is a structured procedure that people involved in quality improvement can implement to manage projects based on the analysis and comparison of alternative scenarios. The role of Six Sigma philosophy in improvement of the quality of healthcare services is recognised both by researchers and by quality practitioners; discrete-event simulation models are commonly used to improve the key performance measures of patient care delivery. The two approaches are seldom referenced and implemented together; however, they could be successfully integrated to carry out quality improvement programs. This paper proposes an innovative approach to bridge the gap and enrich the Six Sigma toolbox of quality improvement procedures with DES.
ADAPTIVE MANAGEMENT FOR IMPROVED WATER QUALITY IN MULTI-USE WATERSHEDS
This project will develop a management plan for eliminating nuisance algal blooms in a chain of reservoirs along the Huron River in southeastern Michigan. The river-reservoir system is used for municipal drinking water, wastewater disposal, irrigation, industrial p...
Total quality management: It works for aerospace information services
NASA Technical Reports Server (NTRS)
Erwin, James; Eberline, Carl; Colquitt, Wanda
1993-01-01
Today we are in the midst of information and 'total quality' revolutions. At the NASA STI Program's Center for AeroSpace Information (CASI), we are focused on using continuous improvements techniques to enrich today's services and products and to ensure that tomorrow's technology supports the TQM-based improvement of future STI program products and services. The Continuous Improvements Program at CASI is the foundation for Total Quality Management in products and services. The focus is customer-driven; its goal, to identify processes and procedures that can be improved and new technologies that can be integrated with the processes to gain efficiencies, provide effectiveness, and promote customer satisfaction. This Program seeks to establish quality through an iterative defect prevention approach that is based on the incorporation of standards and measurements into the processing cycle. Four projects are described that utilize cross-functional, problem-solving teams for identifying requirements and defining tasks and task standards, management participation, attention to critical processes, and measurable long-term goals. The implementation of these projects provides the customer with measurably improved access to information that is provided through several channels: the NASA STI Database, document requests for microfiche and hardcopy, and the Centralized Help Desk.
CQI 101: A First Reader for Higher Education. AAHE's Continuous Quality Improvement Project.
ERIC Educational Resources Information Center
American Association for Higher Education, Washington, DC.
This collection of papers introduces the core ideas of Continuous Quality Improvement (CQI), as Total Quality Management is known in the field of higher education, and underscores its usefulness and relevance for higher education. Papers have the following titles and authors: "The Roots of the TQM Movement" (Warren Schmidt and Jerome Finnigan);…
Developing Quality Improvement capacity and capability across the Children in Fife partnership.
Morris, Craig; Alexander, Ingrid
2016-01-01
A Project Manager from the Fife Early Years Collaborative facilitated a large-scale Quality Improvement (herein QI) project to build organisational capacity and capability across the Children in Fife partnership through three separate, eight month training cohorts. This 18 month QI project enabled 32 practitioners to increase their skills, knowledge, and experiences in a variety of QI tools including the Model for Improvement which then supported the delivery of high quality improvement projects and improved outcomes for children and families. Essentially growing the confidence and capability of practitioners to deliver sustainable QI. 27 respective improvement projects were delivered, some leading to service redesign, reduced waiting times, increased uptake of health entitlements, and improved accessibility to front-line health services. 13 improvement projects spread or scaled beyond the initial site and informal QI mentoring took place with peers in respective agencies. Multiple PDSA cycles were conducted testing the most efficient and effective support mechanisms during and post training, maintaining regular contact, and utilising social media to share progress and achievements.
Kivekäs, Eija; Luukkonen, Irmeli; Mykkänen, Juha; Saranto, Kaija
2014-01-01
In this paper, we present an overview of activities and results from a regional development project in Finland. The aim in this project was to analyze how healthcare providers produce and receive information on a patient's medication, and to identify opportunities to improve the quality, effectiveness, availability and collaboration of social and healthcare services in relation to medication information. The project focused on the most important points in patients' medication management such as home care and care transitions. In a regional development project, data was gathered by interviews and a multi professional workshop. The study revealed that medication information reached only some professionals and lay caregivers despite electronic patient record (EPR) systems and tools. Differences in work processes related to medication reconciliation and information management were discussed in the group meeting and were regarded as a considerable risk for patient safety.
The Role of the Founder in the Creation of Organizational Culture.
1983-01-01
090S 9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT. PROJECT. TASK AREA G WORK UNIT NUMBERS Sloan School of Management Massachusetts...founders were obsessed with product quality and had a hard time seeing how some of their own managerial demands could undermine quality by forcing... employees , but these employees will, as they move up in the organization and become experienced managers , develop a range of new assumptions which
Illinois drainage water management demonstration project
Pitts, D.J.; Cooke, R.; Terrio, P.J.; ,
2004-01-01
Due to naturally high water tables and flat topography, there are approximately 4 million ha (10 million ac) of farmland artificially drained with subsurface (tile) systems in Illinois. Subsurface drainage is practiced to insure trafficable field conditions for farm equipment and to reduce crop stress from excess water within the root zone. Although drainage is essential for economic crop production, there have been some significant environmental costs. Tile drainage systems tend to intercept nutrient (nitrate) rich soil-water and shunt it to surface water. Data from numerous monitoring studies have shown that a significant amount of the total nitrate load in Illinois is being delivered to surface water from tile drainage systems. In Illinois, these drainage systems are typically installed without control mechanisms and allow the soil to drain whenever the water table is above the elevation of the tile outlet. An assessment of water quality in the tile drained areas of Illinois showed that approximately 50 percent of the nitrate load was being delivered through the tile systems during the fallow period when there was no production need for drainage to occur. In 1998, a demonstration project to introduce drainage water management to producers in Illinois was initiated by NRCS4 An initial aspect of the project was to identify producers that were willing to manage their drainage system to create a raised water table during the fallow (November-March) period. Financial assistance from two federal programs was used to assist producers in retrofitting the existing drainage systems with control structures. Growers were also provided guidance on the management of the structures for both water quality and production benefits. Some of the retrofitted systems were monitored to determine the effect of the practice on water quality. This paper provides background on the water quality impacts of tile drainage in Illinois, the status of the demonstration project, preliminary monitoring results, and other observations.
NASA Astrophysics Data System (ADS)
Bedsworth, L. W.; Ekstrom, J.
2017-12-01
As the climate continues to shift, projections show amplified and more frequent extreme events, including coastal and inland flooding, wildfires, prolonged droughts, and heatwaves. Vital public goods, both air quality and water quality, can be critically affected by such extreme events. Climate change will make it increasingly difficult for managers to achieve public health targets for air and water quality. Successfully preparing governance structures developed to maintain and improve air and water quality may benefit from preventative strategies to avoid public health impacts and costs of climate change locally. Perceptions of climate change and its risks, actions taken so far, and perceived barriers to adaptation give insight into the needs of managers for preparing for climate change impacts. This paper compares results of two surveys that looked at local level management of air quality and water quality in California. Air quality managers consistently reported to recognize the risks of climate change on their sector, where water quality managers' perceptions varied between no concern to high concern. We explore the differences in governance, capacity influence the ill-defined responsibility and assumed roles of water and air districts in adaptation to extreme events increasing with climate change. The chain and network of managing air quality is compared with that of water quality - laying out similarities and differences. Then we compare how the survey respondents differed in terms of extreme weather-influenced threats to environmental quality. We end with a discussion of responsibility - where in the chain of managing these life-critical ecosystem services, is the need greatest for adapting to climate change and what does this mean for the other levels in the chain beyond the local management.
PROJECTING WILDLIFE RESPONSES TO ALTERNATIVE FUTURE LANDSCAPES IN OREGON'S WILLAMETTE VALLEY
Increasingly, environmental quality is becoming recognized as a critical factor that should constrain land use planning. One important measure of a landscape's quality is its capacity to support viable populations of wildlife species. But the ability of land managers to balance c...
Rural Water Quality Database: Educational Program to Collect Information.
ERIC Educational Resources Information Center
Lemley, Ann; Wagenet, Linda
1993-01-01
A New York State project created a water quality database for private drinking water supplies, using the statewide educational program to collect the data. Another goal was to develop this program so rural residents could increase their knowledge of water supply management. (Author)
DOT National Transportation Integrated Search
2012-08-01
Material characterization is a critical component of modern day pavement analysis, design, construction, quality : control/quality assurance, management, and rehabilitation. At each stage during the life of a project, the influence of : several funda...
USDA, ARS Soft Wheat Quality Laboratory, Annual Report 2011
USDA-ARS?s Scientific Manuscript database
The report describes new activities for the lab including the a transitions in the laboratory and activites on the USDA, NIFA-funded Triticeae CAP project. Recent research on milling and quality evaluations, data management, molecular evaluations, stem rust resistance from the lab are highlighted, ...
producing the highest quality data. We are organized into 6 functional units: the laboratory, bioinformatics and IT, project management, technology evaluation, statistical genetics, and administration. Our staff is made up of talented and dedicated people who uphold the best standards to ensure excellent quality
Disease Management: The Need for a Focus on Broader Self-Management Abilities and Quality of Life.
Cramm, Jane Murray; Nieboer, Anna Petra
2015-08-01
The study objective was to investigate long-term effects of disease management programs (DMPs) on (1) health behaviors (smoking, physical exercise); (2) self-management abilities (self-efficacy, investment behavior, initiative taking); and (3) physical and mental quality of life among chronically ill patients. The study also examined whether (changes in) health behaviors and self-management abilities predicted quality of life. Questionnaires were sent to all 5076 patients participating in 18 Dutch DMPs in 2010 (T0; 2676 [53%] respondents). Two years later (T1), questionnaires were sent to 4350 patients still participating in DMPs (1722 [40%] respondents). Structured interviews were held with the 18 DMP project leaders. DMP implementation improved patients' health behavior and physical quality of life, but mental quality of life and self-management abilities declined over time. Changes in patients' investment behavior predicted physical quality of life at T1 (P<.001); physical activity, investment behavior (both P<.05), and self-efficacy (P<.01) at T0, and changes in self-efficacy and investment behavior (both P<.001) predicted patients' mental quality of life at T1. The long-term benefits of these DMPs include successful improvement of chronically ill patients' health behaviors and physical quality of life. However, these programs were not able to improve or maintain broader self-management abilities or mental quality of life, highlighting the need to focus on these abilities and overall quality of life. As coproducers of care, patients should be stimulated and enabled to manage their health and quality of life.
Three Interdisciplinary Studies on IT Outsourcing
ERIC Educational Resources Information Center
Gantman, Sonia Vilvovsky
2012-01-01
This dissertation provides interdisciplinary insights into the role of client's internal collaborative experience in managing communication during a complex outsourced project, building a quality client-vendor relationship and ultimately achieving success in the project. Each of the three studies in this dissertation identifies a gap in…
SOCIO-ECONOMIC IMPACT EVALUATION OF LAKE IMPROVEMENT PROJECTS AND LAKE MANAGEMENT GUIDELINES
Under Public Law 92-500, the U.S. Environmental Protection Agency embarked on a major program of cost sharing grants to implement lake rehabilitation and protection projects. Improvement of water quality impacts the lives of people and organizations; however, the methods used to ...
Watson, Nora L; Prosperi, Christine; Driscoll, Amanda J; Higdon, Melissa M; Park, Daniel E; Sanza, Megan; DeLuca, Andrea N; Awori, Juliet O; Goswami, Doli; Hammond, Emily; Hossain, Lokman; Johnson, Catherine; Kamau, Alice; Kuwanda, Locadiah; Moore, David P; Neyzari, Omid; Onwuchekwa, Uma; Parker, David; Sapchookul, Patranuch; Seidenberg, Phil; Shamsul, Arifin; Siazeele, Kazungu; Srisaengchai, Prasong; Sylla, Mamadou; Levine, Orin S; Murdoch, David R; O'Brien, Katherine L; Wolff, Mark; Deloria Knoll, Maria
2017-06-15
The Pneumonia Etiology Research for Child Health (PERCH) study is the largest multicountry etiology study of pediatric pneumonia undertaken in the past 3 decades. The study enrolled 4232 hospitalized cases and 5325 controls over 2 years across 9 research sites in 7 countries in Africa and Asia. The volume and complexity of data collection in PERCH presented considerable logistical and technical challenges. The project chose an internet-based data entry system to allow real-time access to the data, enabling the project to monitor and clean incoming data and perform preliminary analyses throughout the study. To ensure high-quality data, the project developed comprehensive quality indicator, data query, and monitoring reports. Among the approximately 9000 cases and controls, analyzable laboratory results were available for ≥96% of core specimens collected. Selected approaches to data management in PERCH may be extended to the planning and organization of international studies of similar scope and complexity. © The Author 2017. Published by Oxford University Press for the Infectious Diseases Society of America.
Implementing quality/productivity improvement initiatives in an engineering environment
NASA Technical Reports Server (NTRS)
Ruda, R. R.
1985-01-01
Quality/Productivity Improvement (QPI) initiatives in the engineering environment at McDonnell Douglas-Houston include several different, distinct activities, each having its own application, yet all targeted toward one common goal - making continuous improvement a way of life. The chief executive and the next two levels of management demonstrate their commitment to QPI with hands-on involvement in several activities. Each is a member of a QPI Council which consists of six panels - Participative Management, Communications, Training, Performance/Productivity, Human Resources Management and Strategic Management. In addition, each manager conducts Workplace Visits and Bosstalks, to enhance communications with employees and to provide a forum for the identification of problems - both real and perceived. Quality Circles and Project Teams are well established within McConnel Douglas as useful and desirable employee involvement teams. The continued growth of voluntary membership in the circles program is strong evidence of the employee interest and management support that have developed within the organization.
... risk of complications and have better quality of life. Learn More Research Research We Fund Parkinson's Outcomes Project Grant Opportunities Science News & Progress Patient Engagement Research Our research has ...
Landon, M.K.; Delin, G.N.; Nelson, K.J.; Regan, C.P.; Lamb, J.A.; Larson, S.J.; Capel, P.D.; Anderson, J.L.; Dowdy, R.H.
1997-01-01
The Minnesota Management Systems Evaluation Area (MSEA) project was part of a multi-scale, inter-agency initiative to evaluate the effects of agricultural management systems on water quality in the midwest corn belt. The research area was located in the Anoka Sand Plain about 5 kilometers southwest of Princeton, Minnesota. The ground-water-quality monitoring network within and immediately surrounding the research area consisted of 73 observation wells and 25 multiport wells. The primary objectives of the ground-water monitoring program at the Minnesota MSEA were to: (1) determine the effects of three farming systems on ground-water quality, and (2) understand the processes and factors affecting the loading, transport, and fate of agricultural chemicals in ground water at the site. This report presents well construction, geologic, water-level, chemical application, water-quality, and quality-assurance data used to evaluate the effects of farming systems on ground-water quality during 1991-95.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESO KF; HAMILTON HM; FARNER M
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
Neglected environmental health impacts of China's supply-side structural reform.
Zhang, Wei; Zhang, Lei; Li, Ying; Tian, Yuling; Li, Xiaoran; Zhang, Xue; Mol, Arthur P J; Sonnenfeld, David A; Liu, Jianguo; Ping, Zeyu; Chen, Long
2018-06-01
"Supply-side structural reform" (SSSR) has been the most important ongoing economic reform in China since 2015, but its important environmental health effects have not been properly assessed. The present study addresses that gap by focusing on reduction of overcapacity in the coal, steel, and iron sectors, combined with reduction of emissions of sulfur dioxide (SO 2 ), nitrogen oxide (NO x ), and fine particulate matter (PM 2.5 ), and projecting resultant effects on air quality and public health across cities and regions in China. Modeling results indicate that effects on air quality and public health are visible and distributed unevenly across the country. This assessment provides quantitative evidence supporting projections of the transregional distribution of such effects. Such uneven transregional distribution complicates management of air quality and health risks in China. The results challenge approaches that rely solely on cities to improve air quality. The article concludes with suggestions on how to integrate SSSR measures with cities' air quality improvement attainment planning and management performance evaluation. Copyright © 2018 Elsevier Ltd. All rights reserved.
Deployment of lean six sigma in care coordination: an improved discharge process.
Breslin, Susan Ellen; Hamilton, Karen Marie; Paynter, Jacquelyn
2014-01-01
This article presents a quality improvement project to reduce readmissions in the Medicare population related to heart failure, acute myocardial infarction, and pneumonia. The article describes a systematic approach to the discharge process aimed at improving transitions of care from hospital to post-acute care, utilizing Lean Six Sigma methodology. Inpatient acute care hospital. A coordinated discharge process, which includes postdischarge follow-up, can reduce avoidable readmissions. Implications for The quality improvement project demonstrated the significant role case management plays in preventing costly readmissions and improving outcomes for patients through better transitions of care from the hospital to the community. By utilizing Lean Six Sigma methodology, hospitals can focus on eliminating waste in their current processes and build more sustainable improvements to deliver a safe, quality, discharge process for their patients. Case managers are leading this effort to improve care transitions and assure a smoother transition into the community postdischarge..
Restructuring Schools by Applying Deming's Management Theories.
ERIC Educational Resources Information Center
Melvin, Charles A., III
1991-01-01
Four school districts adopted a school restructuring project using Deming's business management method. Deming offered alternative views of organizations based on psychology, systems, perceptual framework, and causes of variance. He listed 14 points for quality improvement. Evaluation indicated that key staff members willingly engaged in…
Alabama Coronary Artery Bypass Grafting Project
Holman, William L.; Sansom, Monique; Kiefe, Catarina I.; Peterson, Eric D.; Hubbard, Steve G.; Delong, James F.; Allman, Richard M.
2004-01-01
Objective/Background: This report describes the first round of results for Phase II of the Alabama CABG Project, a regional quality improvement initiative. Methods: Charts submitted by all hospitals in Alabama performing CABG (ICD-9 codes 36.10–36.20) were reviewed by a Clinical Data Abstraction Center (CDAC) (preintervention 1999–2000; postintervention 2000–2001). Variables that described quality in Phase I were abstracted for Phase II and data describing the new variables of β-blocker use and lipid management were collected. Data samples collected onsite by participating hospitals were used for rapid cycle improvement in Phase II. Results: CDAC data (n = 1927 cases in 1999; n = 2001 cases in 2000) showed that improvements from Phase I in aspirin prescription, internal mammary artery use, and duration of intubation persisted in Phase II. During Phase II, use of β-blockers before, during, or after CABG increased from 65% to 76% of patients (P < 0.05). Appropriate lipid management, an aggregate variable, occurred in 91% of patients before and 91% after the educational intervention. However, there were improvements in 3 of 5 subcategories for lipid management (documenting a lipid disorder [52%–57%], initiating drug therapy [45%–53%], and dietary counseling [74%–91%]; P < 0.05). Conclusions: In Phase II, this statewide process-oriented quality improvement program added two new measures of quality. Achievements of quality improvement from Phase I persisted in Phase II, and improvements were seen in the new variables of lipid management and perioperative use of β-blockers. PMID:14685107
Impact of a quality improvement project on deceased organ donor management
Olmos, Andrea; Feiner, John; Hirose, Ryutaro; Swain, Sharon; Blasi, Annabel; Roberts, John P.; Niemann, Claus U.
2017-01-01
Context Donors showed poor glucose control in the period between declaration of brain death and organ recovery. The level of hyperglycemia in the donors was associated with a decline in terminal renal function. Objective To determine whether implementation of a quality improvement project improved glucose control and preserved renal function in deceased organ donors. Methods Data collected retrospectively included demographics, medical history, mechanism of death, laboratory values, and data from the United Network for Organ Sharing. Results After implementation of the quality improvement project, deceased donors had significantly lower mean glucose concentrations (mean [SD], 162 [44] vs 212 [42] mg/dL; P < .001) and prerecovery glucose concentration (143 [66] vs 241 [69] mg/dL; P < .001). When the donor cohorts from before and after the quality improvement project were analyzed together, mean glucose concentration remained a significant predictor of terminal creatinine level (P < .001). Multivariate analysis of delayed graft function in kidney recipients matched to donors indicated that higher terminal creatinine level was associated with delayed graft function in recipients (P < .001). Conclusion The quality improvement project improved donor glucose homeostasis, and the data confirm that poor glucose homeostasis is associated with worsening terminal renal function. PMID:26645930
Pearse, Bronwyn Louise; Rickard, Claire M; Keogh, Samantha; Lin Fung, Yoke
2018-03-09
Bleeding management in cardiac surgery is challenging. Many guidelines exist to support bleeding management; however, literature demonstrates wide variation in practice. In 2012, a quality initiative was undertaken at The Prince Charles Hospital, Australia to improve bleeding management for cardiac surgery patients. The implementation of the quality initiative resulted in significant reductions in the incidence of blood transfusion, re-exploration for bleeding; superficial leg and chest wound infections; length of hospital stay, and cost. Given the success of the initiative, we sought to answer the question; "How and why was the process of implementing a bleeding management quality initiative in the cardiac surgery unit successful, and sustainable?" A retrospective explanatory case study design was chosen to explore the quality initiative. Analysis of the evidence was reviewed through phases of the 'Knowledgeto Action' planned change model. Data was derived from: (1) document analysis, (2) direct observation of the local environment, (3) clinical narratives from interviews, and analysed with a triangulation approach. The study period extended from 10/2011 to 6/2013. Results demonstrated the complexity of changing practice, as well as the significant amount of dedicated time and effort required to support individual, department and system wide change. Results suggest that while many clinicians were aware of the potential to apply improved practice, numerous barriers and challenges needed to be overcome to implement change across multiple disciplines and departments. The key successful components of the QI were revealed through the case study analysis as: (1) an appropriately skilled project manager to facilitate the implementation process; (2) tools to support changes in workflow and decision making including a bleeding management treatment algorithm with POCCTs; (3) strong clinical leadership from the multidisciplinary team and; (4) the evolution of the project manager position into a perpetual clinical position to support sustainability. Copyright © 2018 Australian College of Critical Care Nurses Ltd. All rights reserved.
Quality assurance guides health reform in Jordan.
Abubaker, W; Abdulrahman, M
1996-01-01
In November 1995, a World Bank mission went to Jordan to conduct a study of the health sector. The study recommended three strategies to reform the health sector: decentralization of Ministry of Health (MOH) management; improvement of clinical practices, quality of care, and consumer satisfaction; and adoption of treatment protocols and standards. The MOH chose quality assurance (QA) methods and quality management (QM) techniques to accomplish these reforms. The Monitoring and QA Directorate oversees QA applications within MOH. It also institutes and develops the capacity of local QA units in the 12 governorates. The QA units implement and monitor day-to-day QA activities. The QM approach encompasses quality principles: establish objectives; use a systematic approach; teach lessons learned and applicable research; use QA training to teach quality care, quality improvement, and patient satisfaction; educate health personnel about QM approaches; use assessment tools and interviews; measure the needs and expectations of local health providers and patients; ensure feedback on QA improvement projects; ensure valid and reliable data; monitor quality improvement efforts; standardize systemic data collection and outcomes; and establish and disseminate QA standards and performance improvement efforts. The Jordan QA Project has helped with the successful institutionalization of a QA system at both the central and local levels. The bylaws of the QA councils and committees require team participation in the decision-making process. Over the last two years, the M&QA Project has adopted 21 standards for nursing, maternal and child health care centers, pharmacies, and medications. The Balqa pilot project has developed 44 such protocols. Quality improvement (COUGH) studies have examined hyper-allergy, analysis of patient flow rate, redistribution of nurses, vaccine waste, and anemic pregnant women. There are a considerable number of on-going clinical and non-clinical COUGH studies. Four epidemiological studies are examining maternal mortality, causes of death, morbidity, and perinatal mortality.
PROJECT SUMMARY: DEVELOPMENT OF THE VIRTUAL BEACH MODEL, PHASE I: AN EMPIRICAL MODEL
Mathematical models based on water-quality and other environmental surrogates may help to provide water quality assessment within a few hours and potentially provide one to three day forecasts, providing beach managers and public-health officials a tool for developing beach-speci...
Quantifying impact of mosquitoes on quality of life
USDA-ARS?s Scientific Manuscript database
New Jersey, like many eastern states, has a persistent problem of the Asian tiger mosquito. This and other mosquitoes reduce residents’ quality of life from discomfort and possible risk of disease. To guide a comprehensive area-wide pest management project to control Aedes albopictus in two counties...
40 CFR 35.917 - Facilities planning (step 1).
Code of Federal Regulations, 2013 CFR
2013-07-01
... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917... the most economical means of meeting established effluent and water quality goals while recognizing... projection totals and disaggregations in approved water quality management (WQM) plans. (See paragraph 8a(3...
40 CFR 35.917 - Facilities planning (step 1).
Code of Federal Regulations, 2014 CFR
2014-07-01
... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917... the most economical means of meeting established effluent and water quality goals while recognizing... projection totals and disaggregations in approved water quality management (WQM) plans. (See paragraph 8a(3...
Code of Federal Regulations, 2010 CFR
2010-01-01
... designated management agency will annually set maximum individual BMP cost-share levels for the project area... offsite water quality, and (2) The matching share requirements would place a burden on the landowner or... shared must have a positive effect on water quality by reducing the amount of agricultural nonpoint...
DCSC (Defense Construction Supply Center) Total Quality Management Master Plan
1989-07-01
job while allowing them to establish a better balance between work and personal needs. 29 TQM SHORT-MID-LONG RANGE INITIATIVES MID RANGE (3 YEARS...all performance standards. IMPROVE THE QUALITY OF WORKLIFE - Projects requiring engineering support throughout FY 90 and beyond are: Construction of
Code of Federal Regulations, 2011 CFR
2011-01-01
... designated management agency will annually set maximum individual BMP cost-share levels for the project area... offsite water quality, and (2) The matching share requirements would place a burden on the landowner or... shared must have a positive effect on water quality by reducing the amount of agricultural nonpoint...
Motivating Language and Empathic Leadership Drives Aircraft Readiness
2017-03-01
4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. 1. AGENCY USE ONLY (Leave blank...language theory, empathic leadership, caring leader, leadership- management exchange (LMX), high quality connections, unit support, organizational justice...critical thinking, Marine Aviation Logistics, Marine Air Group, Marine Aircraft Wing, supply chain management , Squadron, AIRSPEED, lean-six-sigma
Managing a Statewide Virtual Reference Service: How Q and A NJ Works.
ERIC Educational Resources Information Center
Bromberg, Peter
2003-01-01
Describes the live virtual reference service, Q and A NJ (Question and Answer New Jersey), strategies used to meet the challenges of day-to-day management, scaled growth and quality control. Describes how it began; how long it took; how to manage a large project (constant communication; training and practice; transcript analysis and privacy;…
Commercial timber value of streamside management zones in managed pine and hardwood stands
William A. III Lakel; W. Michael Aust; C. Andrew Dollof; Elizabeth P. Sharp
2005-01-01
Streamside management zones (SMZs) are widely recommended for protection of water quality, but the costs associated with maintaining SMZs are not well documented. This project documented the commercial timber values of 16 watersheds in the Piedmont region and 16 watersheds in the Allegheny Plateau region before and after SMZs were established. Four blocks were...
Commercial timber value of streamside management zones in managed pine and hardwood stands
William A. Lake; W. Michael Aust; C. Andrew Dolloff; Elizabeth P. Sharp
2006-01-01
Streamside management zones (SMZs) are widely recommended for protection of water quality, but the costs associated with maintaining SMZs are not well documented. This project documented the commercial timber values of 16 watersheds in the Piedmont region and 16 watersheds in the Allegheny Plateau region before and after SMZs were established. Four blocks were...
Implementing School-Based Management in Indonesia. RTI Research Report Series. Occasional Paper
ERIC Educational Resources Information Center
Heyward, Mark; Cannon, Robert A.; Sarjono
2011-01-01
Indonesia, the world's fourth most populous nation, has been decentralizing its education sector for the past decade. In this context, school-based management is essential for improving the quality of education. A mixed-method, multisite assessment of a project that aimed to improve the management and governance of basic education in Indonesia…
40 CFR 35.915 - State priority system and project priorty list.
Code of Federal Regulations, 2013 CFR
2013-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915 State priority system and project priorty list. Construction grants will be awarded... State priority system and list must be designed to achieve optimum water quality management consistent...
40 CFR 35.915 - State priority system and project priorty list.
Code of Federal Regulations, 2012 CFR
2012-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915 State priority system and project priorty list. Construction grants will be awarded... State priority system and list must be designed to achieve optimum water quality management consistent...
40 CFR 35.915 - State priority system and project priorty list.
Code of Federal Regulations, 2011 CFR
2011-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915 State priority system and project priorty list. Construction grants will be awarded... State priority system and list must be designed to achieve optimum water quality management consistent...
40 CFR 35.915 - State priority system and project priorty list.
Code of Federal Regulations, 2014 CFR
2014-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915 State priority system and project priorty list. Construction grants will be awarded... State priority system and list must be designed to achieve optimum water quality management consistent...
34 CFR 429.31 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2011 CFR
2011-07-01
... information that shows— (i) High quality in the design of the project; (ii) An effective plan of management... looks for information that shows methods of evaluation that are appropriate for the project and, to the... VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION BILINGUAL VOCATIONAL MATERIALS, METHODS, AND...
Building a Digital Library: A Technology Manager's Point of View.
ERIC Educational Resources Information Center
Shaw, Elizabeth J.
2000-01-01
Describes the Historic Pittsburgh project at the University of Pittsburgh, a joint project with the Historical Society of Western Pennsylvania to produce a digital collection of historical materials available on the Internet. Discusses costs; metadata; digitization and preservation of originals; full-text capabilities; scanning; quality review;…
Foundations for a Team Oriented Curriculum
ERIC Educational Resources Information Center
Neal, Brandi; Martz, Ben
2016-01-01
The business world today values collaboration and team work skills such as those found in the area of project management, business process reengineering, quality circles, etc. In response, the use of group projects permeates many curricula today with varying consequences and levels of success. Technology claims to enhance collaboration in…
Collaborative Learning in Advanced Supply Systems: The KLASS Pilot Project.
ERIC Educational Resources Information Center
Rhodes, Ed; Carter, Ruth
2003-01-01
The Knowledge and Learning in Advanced Supply Systems (KLASS) project developed collaborative learning networks of suppliers in the British automotive and aerospace industries. Methods included face-to-face and distance learning, work toward National Vocational Qualifications, and diagnostic workshops for senior managers on improving quality,…
Many stream restoration projects do not include a requirement for long-term monitoring after the project has been completed, resulting in a lack of information about the success or failure of certain restoration techniques. The National Risk Management Research Laboratory (NRMRL...
Oversight of this investigation will be provided by the U.S. Environmental Protection Agency through the Environmental Technology Verification (ETV) Program. This project will be performed by Battelle, which manages the ETV Advanced Monitoring Systems (AMS) Center through a coop...
The no-project alternative analysis: An early product of the Tahoe Decision Support System
Halsing, David L.; Hessenflow, Mark L.; Wein, Anne
2005-01-01
We report on the development of a No-project alternative analysis (NPAA) or “business as usual” scenario with respect to a 20-year projection of 21 indicators of environmental and socioeconomic conditions in the Lake Tahoe Basin for the Tahoe Regional Planning Agency (TRPA). Our effort was inspired by earlier work that investigated the tradeoffs between an environmental and an economic objective. The NPAA study has implications for a longer term goal of building a Tahoe Decision Support System (TDSS) to assist the TRPA and other Basin agencies in assessing the outcomes of management strategies. The NPAA assumes no major deviations from current management practices or from recent environmental or societal trends and planned Environmental Improvement Program (EIP) projects. Quantitative “scenario generation” tools were constructed to simulate site-specific land uses, various population categories, and associated vehicle miles traveled. Projections of each indicator’s attainment status were made by building visual conceptual models of the relevant natural and social processes, extrapolating trends, and using available models, research, and expert opinion. We present results of the NPAA, projected indicator status, key factors affecting the indicators, indicator functionality, and knowledge gaps. One important result is that current management practices may slow the loss or degradation of environmental qualities but not halt or reverse it. Our analysis also predicts an increase in recreation and commuting into and within the basin, primarily in private vehicles. Private vehicles, which are a critical mechanism by which the Basin population affects the surrounding environment, are a key determinant of air-quality indicators, a source of particulate matter affecting Secchi depth, a source of noise, and a factor in recreational and scenic quality, largely owing to congestion. Key uncertainties in the NPAA include climate change, EIP project effectiveness, and external population, economic activity, and air pollution.
Total Quality Management: Analysis, Evaluation and Implementation Within ACRV Project Teams
NASA Technical Reports Server (NTRS)
Raiman, Laura B.
1991-01-01
Total quality management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The Assured Crew Return Vehicle (ACRV) Project Office was identified as an excellent project in which to demonstrate the applications and benefits of TQM processes. As the ACRV Program moves through its various stages of development, it is vital that effectiveness and efficiency be maintained in order to provide the Space Station Freedom (SSF) crew an affordable, on-time assured return to Earth. A critical factor for the success of the ACRV is attaining the maximum benefit from the resources applied to the program. Through a series of four tutorials on various quality improvement techniques, and numerous one-on-one sessions during the SSF's 10-week term in the project office, results were obtained which are aiding the ACRV Office in implementing a disciplined, ongoing process for generating fundamental decisions and actions that shape and guide the organization. Significant advances were made in improving the processes for two particular groups - the correspondence distribution team and the WATER Test team. Numerous people from across JSC were a part of the various team activities including engineering, man systems, and safety. The work also included significant interaction with the support contractor to the ACRV Project. The results of the improvement activities can be used as models for other organizations desiring to operate under a system of continuous improvement. In particular, they have advanced the ACRV Project Teams further down the path of continuous improvement, in support of a working philosophy of TQM.
Physicians in training as quality managers: survival strategy for academic health centers.
Wofford, J L; Moran, W P; Cohen, S J; Simon, R C
1997-12-01
Being responsible for medical education places academic health centers at a disadvantage in competing for managed care contracts. Although many suggestions have been made for changing medical education to produce physicians who are better prepared for the managed care environment, few studies have shown how physicians in training can actually contribute to the competitiveness of an academic health center. We present three examples of engaging trainees in projects with a population-based perspective that demonstrate how quality improvement for the academic health center can be operationalized and even led by physicians in training. In addition to gaining experience in a managed care skill that is increasingly important for future employment, physicians in training can simultaneously improve the quality of care delivered through the academic health center.
Quality management for space systems in ISRO
NASA Astrophysics Data System (ADS)
Satish, S.; Selva Raju, S.; Nanjunda Swamy, T. S.; Kulkarni, P. L.
2009-11-01
In a little over four decades, the Indian Space Program has carved a niche for itself with the unique application driven program oriented towards National development. The end-to-end capability approach of the space projects in the country call for innovative practices and procedures in assuring the quality and reliability of space systems. The System Reliability (SR) efforts initiated at the start of the projects continue during the entire life cycle of the project encompassing design, development, realisation, assembly, testing and integration and during launch. Even after the launch, SR groups participate in the on-orbit evaluation of transponders in communication satellites and camera systems in remote sensing satellites. SR groups play a major role in identification, evaluation and inculcating quality practices in work centres involved in the fabrication of mechanical, electronics and propulsion systems required for Indian Space Research Organization's (ISRO's) launch vehicle and spacecraft projects. Also the reliability analysis activities like prediction, assessment and demonstration as well as de-rating analysis, Failure Mode Effects and Criticality Analysis (FMECA) and worst-case analysis are carried out by SR groups during various stages of project realisation. These activities provide the basis for project management to take appropriate techno-managerial decisions to ensure that the required reliability goals are met. Extensive test facilities catering to the needs of the space program has been set up. A system for consolidating the experience and expertise gained for issue of standards called product assurance specifications to be used in all ISRO centres has also been established.
Erica F. Wadl; William Lakel; Michael Aust; John Seiler
2010-01-01
Streamside management zones (SMZs) are used to protect water quality. Monitoring carbon pools and fluxes in SMZs may a good indicator of the SMZâs overall function and health. In this project we evaluated some of these pools and fluxes from three different SMZ widths (30.5, 15.3, and 7.6 m) in the Piedmont of Virginia. We quantified carbon storage in the soil (upper 10...
Sensitivity, Calibration, and Validation of SWAT in the Choptank River Basin
USDA-ARS?s Scientific Manuscript database
The value of watershed-scale, water quality models to ecosystem management is increasingly evident as more programs adopt these tools to help assess the effectiveness of different management scenarios on the environment. The USDA-Conservation Effects Assessment Project (CEAP) is one such program whi...
Evaluating the Air Quality, Climate Change, and Economic Impacts of Biogas Management Technologies
This is an abstract for a presentation that describes a project to evaluate economic and environmental performance of several biogas management technologies. It will analyze various criteria air pollutants, greenhouse gas emissions, and costs associated with the use of biogas. Th...
The impact of recent drought and water pollution episodes results in an acute need to project future water availability to assist water managers in water utility infrastructure management within many metropolitan regions. Separate drought and water quality indices previously deve...
Jackisch, C; Funk, A; König, K; Lubbe, D; Misselwitz, B; Wagner, U
2014-03-01
Introduction: The Disease Management Project Breast Cancer (DMP Breast Cancer) was first launched in Hesse in 2004. The project is supported by the health insurance companies in Hesse and the Professional Association of Gynaecologists in Hesse. The aim is to offer structured treatment programmes to all women diagnosed with breast cancer in Hesse by creating intersectoral cooperations between coordinating clinics, associated hospitals and gynaecologists in private practice who registered in the DMP programme. Method: Between 1 January 2005 and 30 June 2011, 13 973 women were enrolled in the DMP programme. Results: After data cleansing, survival rates were calculated for a total of 11 214 women. The 5-year overall survival (OS) rate was 86.3 %; survival rates according to tumour stage on presentation were 92.2 % (pT1) and 82.3 % (pT2), respectively. The impact of steroid hormone receptor status on survival (87.8 % for receptor-positive cancers vs. 78.9 % for receptor-negative cancers) and of age at first diagnosis on survival (≤ 35 years = 91 %) were calculated. Conclusion: The project showed that intersectoral cooperation led to significant improvements in the quality of treatment over time, as measured by quality indicators and outcomes after treatment.
77 FR 66470 - Agency Information Collection Activities: Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-05
... provided by grantees under the SCDTDP and monitor and drive improvement on quality measures; (2) collect... review by the Office of Management and Budget (OMB), in compliance with the Paperwork Reduction Act of... Act of 1995: Proposed Project: Sickle Cell Disease Treatment Demonstration Program-- Quality...
INFORMATION MANAGEMENT AND RELATED QUALITY ASSURANCE FOR A LARGE SCALE, MULTI-SITE RESEARCH PROJECT
During the summer of 2000, as part of a U.S. Environmental Protection Agency study designed to improve microbial water quality monitoring protocols at public beaches, over 11,000 water samples were collected at five selected beaches across the country. At each beach, samples wer...
Classification management plan of groundwater quality in Taiwan
NASA Astrophysics Data System (ADS)
Chen, Chun Ming; Chen, Yu Ying; Pan, Shih Cheng; Li, Hui Jun; Hsiao, Fang Ke
2017-04-01
Taiwan Environmental Protection Administration has been monitoring regional water quality for 14 years. Since the beginning of 2002 till now, there are 453 regional groundwater monitoring wells in ten groundwater subregions in Taiwan, and the monitoring of groundwater quality has been carried out for a long time. Currently, water quality monitoring project has reached 50 items, while the number of water quality monitoring data has reached more than 20,000. In order to use the monitoring data efficiently, this study constructed the localized groundwater quality indicators of Taiwan. This indicator takes into account the different users' point of view, incorporating the Taiwan groundwater pollution monitoring standards (Category II), irrigation water quality standard and drinking water source water quality standard. 50 items of water quality monitoring projects were simplified and classified. The groundwater quality parameters were divided into five items, such as potability for drinking water, salting, external influence, health influences and toxicity hazard. The weight of the five items of groundwater was calculated comprehensively, and the groundwater quality of each monitoring well was evaluated with three grades of good, ordinary, and poor. According to the monitoring results of the groundwater monitoring wells in October to December of 2016, about 70% of groundwater quality in Taiwan is in good to ordinary grades. The areas with poor groundwater quality were mostly distributed in coastal, agriculture and part of the urban areas. The conductivity or ammonia nitrogen concentration was higher in those regions, showing that groundwater may be salinized or affected by external influences. Groundwater quality indicators can clearly show the current comprehensive situation of the groundwater environment in Taiwan and can be used as a tool for groundwater quality classification management. The indicators can coordinate with the Taiwan land planning policy in the future, and will be able to effectively grasp the changes of the national sub-regional environmental resources, which can serve as one of the important references in national land zoning according to environmental resources. Keywords: Groundwater Quality Indicators, Groundwater Quality Classification management
Ruoff, Gary
2002-01-01
This project focused on increasing compliance, in a large family practice group, with quality indicators for the management of asthma. The objective was to determine if use of a flow sheet incorporating the Global Initiative for Asthma (GINA) guidelines could improve compliance with those guidelines if the flow sheet was placed in patients' medical records. After review and selection of 14 clinical quality indicators, physicians in the practice implemented a flow sheet as an intervention. These flow sheets were inserted into the records of 122 randomly selected patients with asthma. Medical records were reviewed before the flow sheets were placed in the records, and again approximately 6 months later, to determine if there was a change in compliance with the quality indicators. Improvement of documentation was demonstrated in 13 of the 14 quality indicators. The results indicate that compliance with asthma management quality indicators can improve with the use of a flow sheet.
Excerpts from Managing CQI in Radiology and Diagnostic Imaging Services: A CQI Handbook.
Joseph, E D; Lesher, C; Zage, R
1994-01-01
Continuous quality improvement (CQI) is currently the most popular and influential quality management program used in healthcare organizations. It is an effective methodology for identifying and acting on opportunities to improve the efficiency, effectiveness and value of services provided to customers. CQI implementation can be broken down into four components: (1) achievement objectives and goal identification, (2) system process analysis, (3) action planning and implementation, and (4) performance measurement and follow-up. As the project team establishes goals, it should consider customer and staff needs, what constitutes "quality," existing guidelines and regulations, and how results will be measured. Many techniques can be used to analyze the procedure or function targeted for improvement, including charts and diagrams, formal monitoring, data collection and statistical analysis. After the project team has identified potential service improvements, they develop an action plan, which may include education, recruitment, reassignment or equipment acquisition. The team must consider the impact of proposed changes and the financial and logistical feasibility of various proposals. The dynamic challenges of radiology and diagnostic imaging cannot be addressed through single, isolated actions; efforts to improve quality should be continuous. Accordingly, the project team should measure and analyze results of the action plan, reappraise goals and look for opportunities to further improve service.
NASA Astrophysics Data System (ADS)
Toussaint, F.; Hoeck, H.; Stockhause, M.; Lautenschlager, M.
2014-12-01
The classical goals of a quality assessment system in the data life cycle are (1) to encourage data creators to improve their quality assessment procedures to reach the next quality level and (2) enable data consumers to decide, whether a dataset has a quality that is sufficient for usage in the target application, i.e. to appraise the data usability for their own purpose.As the data volumes of projects and the interdisciplinarity of data usage grow, the need for homogeneous structure and standardised notation of data and metadata increases. This third aspect is especially valid for the data repositories, as they manage data through machine agents. So checks for homogeneity and consistency in early parts of the workflow become essential to cope with today's data volumes.Selected parts of the workflow in the model intercomparison project CMIP5 and the archival of the data for the interdiscipliary user community of the IPCC-DDC AR5 and the associated quality checks are reviewed. We compare data and metadata checks and relate different types of checks to their positions in the data life cycle.The project's data citation approach is included in the discussion, with focus on temporal aspects of the time necessary to comply with the project's requirements for formal data citations and the demand for the availability of such data citations.In order to make different quality assessments of projects comparable, WDCC developed a generic Quality Assessment System. Based on the self-assessment approach of a maturity matrix, an objective and uniform quality level system for all data at WDCC is derived which consists of five maturity quality levels.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meetingmore » held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robinson P. Khosah; Charles G. Crawford
Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analyticalmore » tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project is being conducted in two phases. Phase 1, which is currently in progress and will take twelve months to complete, will include the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. In Phase 2, which will be completed in the second year of the project, a platform for on-line data analysis will be developed. Phase 2 will include the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now into its eleventh month of Phase 1 development activities.« less
Dr. George Woodall has over fifteen years of professional experience. This includes performing assessments of risk from exposure to air pollutants, assessing air quality, and managing research and technical projects.
Management. A continuing bibliography with indexes. [March 1980
NASA Technical Reports Server (NTRS)
1980-01-01
This bibliography cites 604 reports, articles, and other documents introduced into the NASA scientific and technical information system in 1979 covering the management of research and development, contracts, production, logistics, personnel, safety, reliability and quality control. Program, project, and systems management; management policy, philosophy, tools, and techniques; decision making processes for managers; technology assessment; management of urban problems; and information for managers on Federal resources, expenditures, financing, and budgeting are also covered. Abstracts are provided as well as subject, personal author, and corporate source indexes.
Schepman, Sanneke; Valentijn, Pim; Bruijnzeels, Marc; Maaijen, Marlies; de Bakker, Dinny; Batenburg, Ronald; de Bont, Antoinette
2018-06-07
The need for organisational development in primary care has increased as it is accepted as a means of curbing rising costs and responding to demographic transitions. It is only within such inter-organisational networks that small-scale practices can offer treatment to complex patients and continuity of care. The aim of this paper is to explore, through the experience of professionals and patients, whether, and how, project management and network governance can improve the outcomes of projects which promote inter-organisational collaboration in primary care. This paper describes a study of projects aimed at improving inter-organisational collaboration in Dutch primary care. The projects' success in project management and network governance was monitored by interviewing project leaders and board members on the one hand, and improvement in the collaboration by surveying professionals and patients on the other. Both qualitative and quantitative methods were applied to assess the projects. These were analysed, finally, using multi-level models in order to account for the variation in the projects, professionals and patients. Successful network governance was associated positively with the professionals' satisfaction with the collaboration; but not with improvements in the quality of care as experienced by patients. Neither patients nor professionals perceived successful project management as associated with the outcomes of the collaboration projects. This study shows that network governance in particular makes a difference to the outcomes of inter-organisational collaboration in primary care. However, project management is not a predictor for successful inter-organisational collaboration in primary care.
Fast Missile Boat Project Planning using CPM and What If Analysis Method
NASA Astrophysics Data System (ADS)
Silvianita; Firmansyah, R.; Rosyid, D. M.; Suntoyo; Chamelia, D. M.
2018-03-01
This paper discusses analysis of fast ship missile project planning with CPM and What If analysis.The poor performance can cause project delay and cost overruns, these two things often occur in a project management. Scheduling has an important role to control the project. Good scheduling is required because it will affect the product quality. Scheduling is useful to manage the activities so that the project completion time can be as short as possible and it is used to determine the costs of the project are in optimum condition. The alternatives that can be used to overcome the delay project namely increasing labor and equipment.Project planning can be done to determine whether the project is already in an optimum condition. Alternatives that can be used to overcome the delay in the project is to increase labor and equipment, the next is to look for the optimum solution taking into account the duration and gain of each alternative.
Stop the pain! A nation-wide quality improvement programme in paediatric oncology pain control.
Zernikow, Boris; Hasan, Carola; Hechler, Tanja; Huebner, Bettina; Gordon, Deb; Michel, Erik
2008-10-01
Little is known about the impact of translation of pain management clinical practice guidelines on pain control in paediatrics. In an effort to overcome this, a longitudinal, nation-wide, multi-centre paediatric quality improvement (QI) study was initiated by the German Society of Pediatric Haematology and Oncology (GPOH) entitled Schmerz-Therapie in der Onkologischen Paediatrie (STOP). The project's primary major aims were to improve paediatric oncology pain control in Germany, and to evaluate the project's impact on the pain management quality. To achieve these aims, STOP encompassed six sequential phases to evaluate present practice, develop recommendations for practical pain control, actively engage participants in improvement strategies, and assess change. The purpose of this paper is to briefly describe STOP in its entirety, report on comparisons between active quality management (QM) departments that actively participated in the project and non-active QM departments regarding differences in pain control, patients' and parents' perspectives on pain control and health professionals' knowledge, and to discuss the impact of STOP as a whole. Four hypotheses were examined: (1) changes in health care professionals' knowledge on pain in paediatric oncology and pain management after a three-year period (2) impact of active participation in the STOP-project; (3) differences in patients' and parents' perspective in active QM versus non-active QM departments; (4) impact of the STOP-project on the health care professionals' knowledge in active QM versus non-active QM departments. Data included surveys, interviews, and standardised pre-/post-intervention documentation of pain control. All German paediatric oncology departments were invited to participate. The prime means of intervention was education (printed material, passive participation; additional lectures and feed-back, active participation). Quality indicators were defined and compared with regards to the four hypotheses. Sixty-eight departments participated passively. Eight departments participated actively, enrolling 224 patients (median age, 9 years) and documenting a total of 2265 treatment days. In the areas addressed, all health professionals demonstrated increases in knowledge on pain and pain control after a three-year period. STOP objectively improved pain control in the actively participating departments. Painful modes of drug administration were used less frequently; the usage of mixed opioid agonists-antagonists was reduced; the physicians' knowledge of the treatment of neuropathic pain increased; pain ratings significantly decreased, and less episodes of strong pain were observed. There was a significant increase in the proportion of health-care professionals who post-interventionally judged that pain therapy had been initiated earlier and at exactly the right time. Neither patients nor parents felt, however, that there was any quality improvement. According to participants' self-assessment, STOP improved practical pain management in actively participating departments, while in passively participating departments the change to the better was negligible. STOP predominantly aimed at and succeeded in the improvement of structure, process and outcome quality. With regard to patients' and parents' opinions, the interview tools might have been unsuited to measure the quality of pain control, or STOP was insufficient to improve pain control to a magnitude significant to the patient.
A cost-benefit analysis for materials management information systems.
Slapak-Iacobelli, L; Wilde, A H
1993-02-01
The cost-benefit analysis provided the system planners with valuable information that served many purposes. It answered the following questions: Why was the CCF undertaking this project? What were the alternatives? How much was it going to cost? And what was the expected outcome? The process of developing cost-benefit the document kept the project team focused. It also motivated them to involve additional individuals from materials management and accounts payable in its development. A byproduct of this involvement was buy-in and commitment to the project by everyone in these areas. Consequently, the project became a team effort championed by many and not just one. We were also able to introduce two new information system processes: 1) a management review process with goals and anticipated results, and 2) a quality assurance process that ensured the CCF had a better product in the end. The cost-benefit analysis provided a planning tool that assisted in successful implementation of an integrated materials management information system.
Margitai, Barnabás; Dózsa, Csaba; Bárdos-Csenteri, Orsolya Karola; Sándor, János; Gáll, Tibor; Gődény, Sándor
2018-01-01
Objective Quantitative studies have shown the various benefits for having accreditation in hospitals. However, neither of these explored the general conditions before applying for an accreditation. To close this gap, this study aimed to investigate the possible association between joining an accreditation programme with various hospital characteristics. Design A cross-sectional study was implemented using the databases of the 2013 Hungarian hospital survey and of the Hungarian State Treasury. Setting Public general hospitals in Hungary. Participants The analysis involved 44 public general hospitals, 14 of which joined the preparatory project for a newly developed accreditation programme. Main outcome measures The outcomes included the percentage of compliance in quality management, patient information and identification, internal professional regulation, safe surgery, pressure sore prevention, infection control, the opinions of the heads of quality management regarding the usefulness of quality management and clinical audits, and finally, the total debt of the hospital per bed and per discharged patient. Results According to our findings, the general hospitals joining the preparatory project of the accreditation programme performed better in four of the six investigated activities, the head of quality management had a better opinion on the usefulness of quality management, and both the debt per bed number and the debt per discharged patient were lower than those who did not join. However, no statistically significant differences between the two groups were found in any of the examined outcomes. Conclusions The findings suggest that hospitals applying for an accreditation programme do not differ significantly in characteristics from those which did not apply. This means that if in the future the accredited hospitals become better than other hospitals, then the improvement could be solely contributed to the accreditation. PMID:29391381
Center for the Built Environment: About Us
technologies and design and operation techniques. Our projects fall into two broad program areas. First, we environmental quality. This feedback is directed variously at those who manage, operate, and design buildings product offerings, and facility management and design partners to apply these new technologies effectively
Comparison of SWAT Model Water Balance Calibration Using NEXRAD and Surface Rain Gauge Data
USDA-ARS?s Scientific Manuscript database
The value of watershed-scale, water quality models to ecosystem management is increasingly evident as more programs adopt these tools to help assess the effectiveness of different management scenarios on the environment. The USDA-Conservation Effects Assessment Project (CEAP) is one such program whi...
Comparison of Flow Calibration Using NEXRAD and Surface Rain Gauge Data in ArcSWAT
USDA-ARS?s Scientific Manuscript database
The value of watershed-scale, water quality models to ecosystem management is increasingly evident as more programs adopt these tools to help assess the effectiveness of different management scenarios on the environment. The USDA-Conservation Effects Assessment Project (CEAP) is one such program whi...
USDA/Regional Dairy Quality Management Alliance (RDQMA) - 2009 Report
USDA-ARS?s Scientific Manuscript database
Each of three enrolled farms (Farms A, B, and C) receives quarterly farm visits from the project team in their state. At each visit, an online management survey is completed, environmental samples are collected, and blood samples are taken from all lactating cows. Individual fecal samples from lacta...
Stakeholder participation is now widely viewed as an essential component of environmental management projects. Although scholarship has identified and conceptualized numerous elements and components of high-quality participation, we argue that the processes of recruiting stakehol...
Management of spruce-fir in even-aged stands in the central Rocky Mountains
Robert R. Alexander; Carleton B. Edminster
1980-01-01
Potential production of Engelmann spruce and subalpine fir in the central Rocky Mountains is simulated for vario.us combinations of stand density, site quality, ages, and thinning schedules. Such estimates are needed to project future development of stands managed in different ways for various uses.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-27
...: [email protected] . Mail/Hand Delivery/Courier: Michael Davis, Project Manager, Consumer Financial... application of best management practices (BMP) to minimize short term air quality and noise impact during... of Final Environmental Assessment (FINAL EA) and a Finding of No Significant Impact (FONSI) for...
Using Participatory Management in a Traditional Environment.
ERIC Educational Resources Information Center
Tavarone, Antonia R.
This paper describes the use of a participatory management process in an older, public-sector bureaucracy with an extremely traditional, hierarchical, and entrenched culture. Into this culture, two separate projects were introduced: an employee involvement program using the quality circle concept and a task force that would design and implement an…
ERIC Educational Resources Information Center
Reaves, William E.; Narvaez, Jeanette G.
2006-01-01
Partnerships and collaborative projects among public schools and universities have become increasingly prominent in the educational landscape. Properly structured and carefully managed school-university initiatives can enrich educational opportunities and contribute to simultaneous and continual quality improvement of the partnering entities. In…
USDA-ARS?s Scientific Manuscript database
Many of the world's national genebanks, responsible for the safeguarding and availability of their country's Plant Genetic Resource (PGR) collections, have lacked access to high quality IT needed to document and manage their collections electronically. The Germplasm Resource Information System (GRI...
Data management for interdisciplinary field experiments: OTTER project support
NASA Technical Reports Server (NTRS)
Angelici, Gary; Popovici, Lidia; Skiles, J. W.
1993-01-01
The ability of investigators of an interdisciplinary science project to properly manage the data that are collected during the experiment is critical to the effective conduct of science. When the project becomes large, possibly including several scenes of large-format remotely sensed imagery shared by many investigators requiring several services, the data management effort can involve extensive staff and computerized data inventories. The OTTER (Oregon Transect Ecosystem Research) project was supported by the PLDS (Pilot Land Data System) with several data management services, such as data inventory, certification, and publication. After a brief description of these services, experiences in providing them are compared with earlier data management efforts and some conclusions regarding data management in support of interdisciplinary science are discussed. In addition to providing these services, a major goal of this data management capability was to adopt characteristics of a pro-active attitude, such as flexibility and responsiveness, believed to be crucial for the effective conduct of active, interdisciplinary science. These are also itemized and compared with previous data management support activities. Identifying and improving these services and characteristics can lead to the design and implementation of optimal data management support capabilities, which can result in higher quality science and data products from future interdisciplinary field experiments.
Chernobyl post-accident management: the ETHOS project.
Dubreuil, G H; Lochard, J; Girard, P; Guyonnet, J F; Le Cardinal, G; Lepicard, S; Livolsi, P; Monroy, M; Ollagnon, H; Pena-Vega, A; Pupin, V; Rigby, J; Rolevitch, I; Schneider, T
1999-10-01
ETHOS is a pilot research project supported by the radiation protection research program of the European Commission (DG XII). The project provides an alternative approach to the rehabilitation of living conditions in the contaminated territories of the CIS in the post-accident context of Chernobyl. Initiated at the beginning of 1996, this 3-y project is currently being implemented in the Republic of Belarus. The ETHOS project involves an interdisciplinary team of European researchers from the following institutions: the Centre d'etude sur l'Evaluation de la Protection dans le domaine Nucleaire CEPN (radiological protection, economics), the Institute National d'Agronomie de Paris-Grignon INAPG (agronomy, nature & life management), the Compiegne University of Technology (technological and industrial safety, social trust), and the Mutadis Research Group (sociology, social risk management), which is in charge of the scientific co-ordination of the project. The Belarussian partners in the ETHOS project include the Ministry of Emergencies of Belarus as well as the various local authorities involved with the implementation site. The ETHOS project relies on a strong involvement of the local population in the rehabilitation process. Its main goal is to create conditions for the inhabitants of the contaminated territories to reconstruct their overall quality of life. This reconstruction deals with all the day-to-day aspects that have been affected or threatened by the contamination. The project aims at creating a dynamic process whereby acceptable living conditions can be rebuilt. Radiological security is developed in the ETHOS project as part of a general improvement in the quality of life. The approach does not dissociate the social and the technical dimensions of post-accident management. This is so as to avoid radiological risk assessment and management being reduced purely to a problem for scientific experts, from which local people are excluded, and to take into consideration the problems of acceptability of decisions and the distrust of the population towards experts. These cannot be solved merely by a better communication strategy. This paper presents the main features of the methodological approach of the ETHOS project. It also explains how it is being implemented in the village of Olmany in the district of Stolyn (Brest region) in Belarus since March 1996, as well as its initial achievements.
People Management. Final Report of the People Management Committee
1975-04-25
Objective Memorandum Planning, Programming, C Budgeting System Personnel Priority Model Projected Requisitioning Authority Prior ServIce Quality ...April 1975 PREPARED FOR - G THE DEPARTMENT OF ARMY OFFICE OF THE DEPUTY CHIEF OF STAFF FOR PERSONNEL NATIONAL TECHNICAL INFORMATION SERVICE US... service accessions and reenllstees. (3) Manage the DEP. (4) Bolster systems discipline. d. RecommendetIons; (1) That manpower objectives
Muşat, Simona Nicoleta; Ioniţa, Diana; Paceonea, Mirela; Chiriac, Nona Delia; Stoicescu, Ileana Paula; Mihălţan, F D
2011-01-01
Identifying and promoting new management techniques for the descentralized pneumology hospitals or wards was one of the most ambitious objectives of the project "Quality in the pneumology medical services through continuous medical education and organizational flexibility", financed by the Human Resourses Development Sectorial Operational Programme 2007-2013 (ID 58451). The "Medium term Strategy on the specific management of the pneumology hospitals or wards after the descentralization of the sanitary system" presented in the article was written by the project's experts and discussed with pneumology managers and local authorities representatives. This Strategy application depends on the colaboration of the pneumology hospitals with professional associations, and local and central authorities.
Jassani, Kashif; Essani, Rozina Roshan; Abbas, Syed Nadeem Husain
2016-01-01
Northern Pakistan remains very challenging terrain due to harsh weather all year round presenting an infrastructura, human resource and supply chain challenge of its own. Many times the facility had to move to different locations on emergency and ad hoc basis due to landslides, earthquakes affecting continuity of care. Providing quality healthcare to often resource constraint hard-to-reach areas has always been AKHS,P's unique forte. Breaking barriers for catchment population to access quality healthcare, AKHS,P embarked on an initiative of implementing, achieving and sustaining ISO 9001:2008 Quality Management System international standards certification. This article shares the unique experience of AKHS,P in achieving and sustaining ISO 9001:2008 International Quality Management System Certification. After untiring efforts and the hard work of ground staff; AKHS,P achieved ISO 9001:2008 International Quality Management System Certification as well as 1st Surveillance Audit which itself proved that AKHS,P sustained quality systems and ensured continuous quality improvement in the Mountains of Northern Pakistan.
Aiyegbusi, Olalekan Lee; Kyte, Derek; Cockwell, Paul; Marshall, Tom; Dutton, Mary; Slade, Anita; Marklew, Neil; Price, Gary; Verdi, Rav; Waters, Judi; Sharpe, Keeley; Calvert, Melanie
2017-06-30
Advanced chronic kidney disease (CKD) has a major effect on the quality of life and health status of patients and requires accurate and responsive management. The use of electronic patient-reported outcome measures (ePROMs) could assist patients with advanced pre-dialysis CKD, and the clinicians responsible for their care, by identifying important changes in symptom burden in real time. We report the protocol for 'Using Patient-Reported Outcome measures (PROMs) to promote quality of care and safety in the management of patients with Advanced Chronic Kidney Disease' (PRO-trACK) project, which will explore the feasibility and validity of an ePROM system for use in patients with advanced CKD. The project will use a mixed-methods approach in three studies: (1) usability testing of the ePROM system involving up to 30 patients and focusing on acceptability and technical performance/stability; (2) ascertaining the views of patient and clinician stakeholders on the optimal use and administration of the CKD ePROM system-this will involve qualitative face-to-face/telephone interviewing with up to 30 patients or until saturation is achieved, focus groups with up to 15 clinical staff, management and IT team members; (3) psychometric assessment of the system, within a cohort of at least 180 patients with advanced CKD, to establish the measurement properties of the ePROM. This project was approved by the West Midlands Edgbaston Research Ethics Committee (Reference 17/WM/0010) and received Health Research Authority (HRA) approval on 24 February 2017.The findings from this project will be provided to clinicians at the Department of Renal Medicine, Queen Elizabeth Hospitals, Birmingham (QEHB), NHS England, presented at conferences and to the Kidney Patients' Association, British Kidney Patient Association and the British Renal Society. Articles based on the findings will be written and submitted for publication in peer-reviewed journals. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2017. All rights reserved. No commercial use is permitted unless otherwise expressly granted.
Lloyd, Sheree; Collie, Jean; McInnes, Alastair; King, Kevin; Lollback, Alison; Garland, Angie
This paper describes current progress for an information management project in a medium-sized rural hospital after the first four months of the one-year project. In particular, the article examines some of the project outcomes to date as these relate to the National Hospitals and Health Reform recommendations for the smart use of data, information and communication. The paper identifies a number of important challenges and issues that have been addressed by the project and proposes that the project findings may be used to inform similar projects in other settings. These findings relate to clinician requirements for reports, investment in human resources, development, and time for information management activities. An understanding of data collected, information systems, and presentation of clinician data are also important. The benefits of information sharing in assisting quality improvement activities are particularly relevant but, more importantly, they can engage and involve clinicians in the use of information. The importance of local data, information, and knowledge is described. Finally, issues for the health information management profession, such as working collegially and sharing knowledge and expertise, are outlined.
Chute, Christopher G; Pathak, Jyotishman; Savova, Guergana K; Bailey, Kent R; Schor, Marshall I; Hart, Lacey A; Beebe, Calvin E; Huff, Stanley M
2011-01-01
SHARPn is a collaboration among 16 academic and industry partners committed to the production and distribution of high-quality software artifacts that support the secondary use of EMR data. Areas of emphasis are data normalization, natural language processing, high-throughput phenotyping, and data quality metrics. Our work avails the industrial scalability afforded by the Unstructured Information Management Architecture (UIMA) from IBM Watson Research labs, the same framework which underpins the Watson Jeopardy demonstration. This descriptive paper outlines our present work and achievements, and presages our trajectory for the remainder of the funding period. The project is one of the four Strategic Health IT Advanced Research Projects (SHARP) projects funded by the Office of the National Coordinator in 2010. PMID:22195076
Chute, Christopher G; Pathak, Jyotishman; Savova, Guergana K; Bailey, Kent R; Schor, Marshall I; Hart, Lacey A; Beebe, Calvin E; Huff, Stanley M
2011-01-01
SHARPn is a collaboration among 16 academic and industry partners committed to the production and distribution of high-quality software artifacts that support the secondary use of EMR data. Areas of emphasis are data normalization, natural language processing, high-throughput phenotyping, and data quality metrics. Our work avails the industrial scalability afforded by the Unstructured Information Management Architecture (UIMA) from IBM Watson Research labs, the same framework which underpins the Watson Jeopardy demonstration. This descriptive paper outlines our present work and achievements, and presages our trajectory for the remainder of the funding period. The project is one of the four Strategic Health IT Advanced Research Projects (SHARP) projects funded by the Office of the National Coordinator in 2010.
Register-Recall Systems: Tools for Chronic Disease Management in General Practice.
Georgiou, Andrew; Burns, Joan; Penn, Danielle; Infante, Fernando; Harris, Mark
2004-09-01
The Divisions Diabetes and Cardiovascular Disease Quality Improvement Project (DDCQIP) is a national project that aims to promote quality improvement initiatives among Divisions of General Practice. DDCQIP has investigated the growth of Division-based diabetes and cardiovascular disease register-recall systems and the role they play in promoting evidence-based structured care within general practice. In the period 2000-2002, an increase in the number of GPs using register-recall systems and the rise in the number of active registered patients have made it possible to monitor quality of care and health outcome indicators, and contributed to the growth of a Division-based population health program.
American Pharmacists Association
... Tools Quality Measures Transitions of Care Chronic Care Management Appointment Based Model OTC Supplement OPIOID Center Nuclear Pharmacy Clinical Guidelines Conducting Research Projects GET INVOLVED Participate House of Delegates APhA-APPM ...
Undergraduate Quality Management Project: Motorcycle Manufacturer Vendor Rating System
ERIC Educational Resources Information Center
Baker, James; McHaney, Roger
2009-01-01
A major motorcycle vendor, based in the U.S. Midwest, is the world's largest custom V-Twin motorcycle manufacturer and domestically the second largest motorcycle manufacturer behind Harley-Davidson. This project describes the process used used by a K-State undergraduate distance learning student to design and develop the initial version of a…
40 CFR 258.41 - Project XL Bioreactor Landfill Projects.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Air Quality Agency for the Buncombe County Solid Waste Management Facility in effect, and shall comply... action. The termination will take effect 60 days from the date of the notice, unless the EPA Regional.... These reporting provisions shall remain in effect for as long as the owner or operator of the Yolo...
Guidance and Control Software Project Data - Volume 1: Planning Documents
NASA Technical Reports Server (NTRS)
Hayhurst, Kelly J. (Editor)
2008-01-01
The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.
Quantitative CMMI Assessment for Offshoring through the Analysis of Project Management Repositories
NASA Astrophysics Data System (ADS)
Sunetnanta, Thanwadee; Nobprapai, Ni-On; Gotel, Olly
The nature of distributed teams and the existence of multiple sites in offshore software development projects pose a challenging setting for software process improvement. Often, the improvement and appraisal of software processes is achieved through a turnkey solution where best practices are imposed or transferred from a company’s headquarters to its offshore units. In so doing, successful project health checks and monitoring for quality on software processes requires strong project management skills, well-built onshore-offshore coordination, and often needs regular onsite visits by software process improvement consultants from the headquarters’ team. This paper focuses on software process improvement as guided by the Capability Maturity Model Integration (CMMI) and proposes a model to evaluate the status of such improvement efforts in the context of distributed multi-site projects without some of this overhead. The paper discusses the application of quantitative CMMI assessment through the collection and analysis of project data gathered directly from project repositories to facilitate CMMI implementation and reduce the cost of such implementation for offshore-outsourced software development projects. We exemplify this approach to quantitative CMMI assessment through the analysis of project management data and discuss the future directions of this work in progress.
(abstract) Mission Operations and Control Assurance: Flight Operations Quality Improvements
NASA Technical Reports Server (NTRS)
Welz, Linda L.; Bruno, Kristin J.; Kazz, Sheri L.; Witkowski, Mona M.
1993-01-01
Mission Operations and Command Assurance (MO&CA), a recent addition to flight operations teams at JPL. provides a system level function to instill quality in mission operations. MO&CA's primary goal at JPL is to help improve the operational reliability for projects during flight. MO&CA tasks include early detection and correction of process design and procedural deficiencies within projects. Early detection and correction are essential during development of operational procedures and training of operational teams. MO&CA's effort focuses directly on reducing the probability of radiating incorrect commands to a spacecraft. Over the last seven years at JPL, MO&CA has become a valuable asset to JPL flight projects. JPL flight projects have benefited significantly from MO&CA's efforts to contain risk and prevent rather than rework errors. MO&CA's ability to provide direct transfer of knowledge allows new projects to benefit directly from previous and ongoing experience. Since MO&CA, like Total Quality Management (TQM), focuses on continuous improvement of processes and elimination of rework, we recommend that this effort be continued on NASA flight projects.
Utilization of building information modeling in infrastructure’s design and construction
NASA Astrophysics Data System (ADS)
Zak, Josef; Macadam, Helen
2017-09-01
Building Information Modeling (BIM) is a concept that has gained its place in the design, construction and maintenance of buildings in Czech Republic during recent years. This paper deals with description of usage, applications and potential benefits and disadvantages connected with implementation of BIM principles in the preparation and construction of infrastructure projects. Part of the paper describes the status of BIM implementation in Czech Republic, and there is a review of several virtual design and construction practices in Czech Republic. Examples of best practice are presented from current infrastructure projects. The paper further summarizes experiences with new technologies gained from the application of BIM related workflows. The focus is on the BIM model utilization for the machine control systems on site, quality assurance, quality management and construction management.
Richard W. Haynes; Roger D. Fight
2004-01-01
Grade-specific price projections were once again developed for Douglas-fir, coast hem-fir, inland hem-fir, and ponderosa pine lumber. These grade-specific price projections can be used to demonstrate the returns to land management of practices that lead to high-quality logs that produce a larger proportion of high grades of lumber. The price ratios among low, medium,...
ERIC Educational Resources Information Center
Chetley, Andrew
In 1977, the Bernard van Leer Foundation began supporting a project in Colombia that had the objective of improving the quality of early childhood care and education in a small village. The Costa Atlantica project offered an approach to development that was based on community organization, social management, participation, cooperation, popular…
Re-engineering Nascom's network management architecture
NASA Technical Reports Server (NTRS)
Drake, Brian C.; Messent, David
1994-01-01
The development of Nascom systems for ground communications began in 1958 with Project Vanguard. The low-speed systems (rates less than 9.6 Kbs) were developed following existing standards; but, there were no comparable standards for high-speed systems. As a result, these systems were developed using custom protocols and custom hardware. Technology has made enormous strides since the ground support systems were implemented. Standards for computer equipment, software, and high-speed communications exist and the performance of current workstations exceeds that of the mainframes used in the development of the ground systems. Nascom is in the process of upgrading its ground support systems and providing additional services. The Message Switching System (MSS), Communications Address Processor (CAP), and Multiplexer/Demultiplexer (MDM) Automated Control System (MACS) are all examples of Nascom systems developed using standards such as, X-windows, Motif, and Simple Network Management Protocol (SNMP). Also, the Earth Observing System (EOS) Communications (Ecom) project is stressing standards as an integral part of its network. The move towards standards has produced a reduction in development, maintenance, and interoperability costs, while providing operational quality improvement. The Facility and Resource Manager (FARM) project has been established to integrate the Nascom networks and systems into a common network management architecture. The maximization of standards and implementation of computer automation in the architecture will lead to continued cost reductions and increased operational efficiency. The first step has been to derive overall Nascom requirements and identify the functionality common to all the current management systems. The identification of these common functions will enable the reuse of processes in the management architecture and promote increased use of automation throughout the Nascom network. The MSS, CAP, MACS, and Ecom projects have indicated the potential value of commercial-off-the-shelf (COTS) and standards through reduced cost and high quality. The FARM will allow the application of the lessons learned from these projects to all future Nascom systems.
Moses Lake Fishery Restoration Project : FY 1999 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None given
2000-12-01
The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie,more » bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.« less
Ten tips for incorporating scientific quality improvement into everyday work.
Goldmann, Don
2011-04-01
Healthcare personnel often find it challenging to incorporate disciplined quality improvement into their daily work. Planning, managing and completing improvement projects with sufficient rigour to generate credible evidence and potentially publishable knowledge are even more difficult. Nonetheless, careful set-up and agile leveraging of existing resources and expertise can lead to surprisingly robust results. Project designs that integrate data collection with the work itself are especially helpful. Although the general perception is that top-flight journals are loath to publish the results of quality improvement work, accumulating experience suggests that this hurdle can be overcome. The Standards for Quality Improvement Reporting Excellence guidelines provide a promising framework for crafting publications that can meet the exacting standards of peer-reviewed journals.
Ten tips for incorporating scientific quality improvement into everyday work
2011-01-01
Healthcare personnel often find it challenging to incorporate disciplined quality improvement into their daily work. Planning, managing and completing improvement projects with sufficient rigour to generate credible evidence and potentially publishable knowledge are even more difficult. Nonetheless, careful set-up and agile leveraging of existing resources and expertise can lead to surprisingly robust results. Project designs that integrate data collection with the work itself are especially helpful. Although the general perception is that top-flight journals are loath to publish the results of quality improvement work, accumulating experience suggests that this hurdle can be overcome. The Standards for Quality Improvement Reporting Excellence guidelines provide a promising framework for crafting publications that can meet the exacting standards of peer-reviewed journals. PMID:21450777
Increasing Epilepsy Awareness in Schools: A Seizure Smart Schools Project.
Brook, Heather A; Hiltz, Cynthia M; Kopplin, Vicki L; Lindeke, Linda L
2015-08-01
A high prevalence of epilepsy diagnoses and seizure events among students was identified at a large Midwestern school district. In partnership with the Epilepsy Foundation of Minnesota (EFMN), a quality improvement project was conducted to provide education and resources to staff caring for school children with seizures. School nurses (N = 26) were trained as seizure management educators and instructed staff in 21 schools on seizure awareness and response. School nurses utilized new seizure management resources, a procedural guideline, and care plan updates. The majority of school nurses rated the resources and training interventions as "very helpful." School nurse confidence in managing students with seizures increased, seizure action plan use increased, and 88% of children's records with new seizure diagnoses had completed documentation. School nurses played vital roles in increasing seizure awareness as educators and care managers. EFMN is using this project as an exemplar for expanding its Seizure Smart Schools program. © The Author(s) 2015.
NASA Astrophysics Data System (ADS)
Osti, D.; Osti, A.
2013-12-01
People are very busy today and getting stakeholders the information they need is an important part of our jobs. The BDL application is the mobile extension of the California collaborative resource management portal www.baydeltalive.com. BDL has been visited by more than 250,000 unique visitors this past year from various areas of water use and management including state and federal agencies, agriculture, scientists, policy makers, water consumers, voters, operations management and more. The audience is a qualified user group of more than 15,000 individuals participating in California hydrological ecosystem science, water management and policy. This is an important effort aimed to improve how scientists and policy makers are working together to understand this complicated and divisive system and how they are becoming better managers of that system. The BayDetaLive mobile application gives California watershed management stakeholders and water user community unprecedented access to real time natural resource management information. The application provides user with the following: 1. Access to Real Time Environmental Conditions from the more than the 600 California Data Exchange Sensors including hydrodynamic, water quality and meteorological data. Save important stations as favorites for easy access later. 2. Daily Delta Operations Data including estimated hydrology, daily exports, status of infrastructure operations, reservoir storage, salvage data, major stations, drinking water quality reports, weather forecasts and more. 3. Photos/Videos/Documents: Browse and share from the more than 1000 current documents in the BDL library. Relevant images, videos, science journals, presentations and articles. 4. Science: Access the latest science articles, news, projects and journals. 5. Data Visualizations: View recently published real time data interpolations of Delta Conditions. From 30-day turbidity models to daily forecasts. This service is published as conditions produce scientifically relevant visuals including winter conditions, first flush archives and fish migration seasons. 5. Maps: Access the entire Delta Atlas from anywhere! The atlas includes Delta levees, soils, islands and waterways, diversions, infrastructure, urban areas, land use, salinity, tidal flows, managed lands, protected lands and more. 6. Projects: Discover the latest project summaries currently underway in the Delta. Project Categories include restoration, operations, infrastructure to name a few. Share your discovery for more depth access on the BayDeltaLive.com website. 7. News: Current Delta Science topics. App Keywords: California Delta, Water Management, Natural Resource Management, Real Time Data, Water Operations, Water Supply, Water Quality, Collaboration
Requirements of supply chain management in differentiating European pork chains.
Trienekens, Jacques; Wognum, Nel
2013-11-01
This paper summarizes results obtained by research into pork chain management in the EU Integrated Project Q-Porkchains. Changing demands for intrinsic and extrinsic quality attributes of pork products impact the way supply chain management should be organized from the farmer down to the consumer. The paper shows the importance of Quality Management Systems for integrating supply chains and enhancing consumer confidence. The paper also presents innovations in information system integration for aligning information exchange in the supply chain and logistics concepts based on innovative measurement technologies at the slaughterhouse stage. In the final section research challenges towards sustainable pork supply chains satisfying current consumer demands are presented. Copyright © 2013 Elsevier Ltd. All rights reserved.
Drinking water supplies can be vulnerable to impacts from short-term weather events, long-term changes in land-use and climate, and water quality controls in treatment and distribution. Disinfection by-product (DBP) formation in drinking water is a prominent example to illustrate...
Drinking water supplies can be vulnerable to impacts from short-term weather events, long-term changes in land-use and climate, and water quality controls in treatment and distribution. Disinfection by-product (DBP) formation in drinking water is a prominent example to illustrate...
ERIC Educational Resources Information Center
Grant, LaVerne F.; Kelley, Jane H.; Northington, LaDonna; Barlow, Delores
2002-01-01
Junior and senior nursing students participated in collaborative learning projects developed using total quality management/continuous quality improvement processes. Seniors mentored and evaluated juniors. Feedback from 37 seniors and 53 juniors was predominantly positive; dissatisfaction centered on time issues and misunderstanding of project…
40 CFR 52.270 - Significant deterioration of air quality.
Code of Federal Regulations, 2013 CFR
2013-07-01
... applicable State plan for the State of California. (b) District PSD Plans. (1) The PSD rules for Sacramento... of PSD increments. (ii) Those projects which are major stationary sources or major modifications... 83-01, 5/6/83. (2) The PSD rules for North Coast Unified Air Quality Management District are approved...
40 CFR 52.270 - Significant deterioration of air quality.
Code of Federal Regulations, 2012 CFR
2012-07-01
... applicable State plan for the State of California. (b) District PSD Plans. (1) The PSD rules for Sacramento... of PSD increments. (ii) Those projects which are major stationary sources or major modifications... 83-01, 5/6/83. (2) The PSD rules for North Coast Unified Air Quality Management District are approved...
40 CFR 52.270 - Significant deterioration of air quality.
Code of Federal Regulations, 2011 CFR
2011-07-01
... applicable State plan for the State of California. (b) District PSD Plans. (1) The PSD rules for Sacramento... of PSD increments. (ii) Those projects which are major stationary sources or major modifications... 83-01, 5/6/83. (2) The PSD rules for North Coast Unified Air Quality Management District are approved...
40 CFR 52.270 - Significant deterioration of air quality.
Code of Federal Regulations, 2014 CFR
2014-07-01
... applicable State plan for the State of California. (b) District PSD Plans. (1) The PSD rules for Sacramento... of PSD increments. (ii) Those projects which are major stationary sources or major modifications... 83-01, 5/6/83. (2) The PSD rules for North Coast Unified Air Quality Management District are approved...
A Quality Assurance Project Plan (QAPP) was prepared to document the primary objectives and data collection and interpretation efforts for two landfill bioreactor studies at the Outer Loop Landfill in Louisville, KY, operated by Waste Management, Inc. WMI). The two multi-year stu...
A Quality Assurance Project Plan (QAPP) was prepared to document the primary objectives and data collection and interpretation efforts for two landfill bioreactor studies at the Outer Loop Landfill in Louisville, KY, operated by Waste Management, Inc. WMI). The two multi-year stu...
Managing and learning with multiple models: Objectives and optimization algorithms
Probert, William J. M.; Hauser, C.E.; McDonald-Madden, E.; Runge, M.C.; Baxter, P.W.J.; Possingham, H.P.
2011-01-01
The quality of environmental decisions should be gauged according to managers' objectives. Management objectives generally seek to maximize quantifiable measures of system benefit, for instance population growth rate. Reaching these goals often requires a certain degree of learning about the system. Learning can occur by using management action in combination with a monitoring system. Furthermore, actions can be chosen strategically to obtain specific kinds of information. Formal decision making tools can choose actions to favor such learning in two ways: implicitly via the optimization algorithm that is used when there is a management objective (for instance, when using adaptive management), or explicitly by quantifying knowledge and using it as the fundamental project objective, an approach new to conservation.This paper outlines three conservation project objectives - a pure management objective, a pure learning objective, and an objective that is a weighted mixture of these two. We use eight optimization algorithms to choose actions that meet project objectives and illustrate them in a simulated conservation project. The algorithms provide a taxonomy of decision making tools in conservation management when there is uncertainty surrounding competing models of system function. The algorithms build upon each other such that their differences are highlighted and practitioners may see where their decision making tools can be improved. ?? 2010 Elsevier Ltd.
NASA Astrophysics Data System (ADS)
Niemand, C.; Kuhn, K.; Schwarze, R.
2010-12-01
SHARP is a European INTERREG IVc Program. It focuses on the exchange of innovative technologies to protect groundwater resources for future generations by considering the climate change and the different geological and geographical conditions. Regions involved are Austria, United Kingdom, Poland, Italy, Macedonia, Malta, Greece and Germany. They will exchange practical know-how and also determine know-how demands concerning SHARP’s key contents: general groundwater management tools, artificial groundwater recharge technologies, groundwater monitoring systems, strategic use of groundwater resources for drinking water, irrigation and industry, techniques to save water quality and quantity, drinking water safety plans, risk management tools and water balance models. SHARP Outputs & results will influence the regional policy in the frame of sustainable groundwater management to save and improve the quality and quantity of groundwater reservoirs for future generations. The main focus of the Saxon State Office for Environment, Agriculture and Landscape in this project is the enhancement and purposive use of water balance models. Already since 1992 scientists compare different existing water balance models on different scales and coupled with groundwater models. For example in the KLIWEP (Assessment of Impacts of Climate Change Projections on Water and Matter Balance for the Catchment of River Parthe in Saxony) project the coupled model WaSiM-ETH - PCGEOFIM® has been used to study the impact of climate change on water balance and water supplies. The project KliWES (Assessment of the Impacts of Climate Change Projections on Water and Matter Balance for Catchment Areas in Saxony) still running, comprises studies of fundamental effects of climate change on catchments in Saxony. Project objective is to assess Saxon catchments according to the vulnerability of their water resources towards climate change projections in order to derive region-specific recommendations for management actions. The model comparisons within reference areas showed significant differences in outcome. The values of water balance components calculated with different models partially fluctuate by a multiple of their value. The SHARP project was prepared in several previous projects that were testing suitable water balance models and is now able to assist the knowledge transfer.
Engineering and management experience at Texas A&M Transportation Institute
NASA Astrophysics Data System (ADS)
Chowdhury, Arif Tahjibul
This manuscript presents the author's engineering and management experience during his internship in the Materials and Pavements (M&P) Division at the Texas A&M Transportation Institute (TTI), and is a record of study for the Doctor of Engineering at Texas A&M University. Through this internship, he met his established internship objectives of gaining technical knowledge as well as knowledge and skills in project management, organizational communication, and quality management of pavement condition data, and of attaining professional development. In meeting these objectives, the author describes the history, mission, and organizational structure of his workplace. He also presents his experience of developing and delivering a two-week training course on pavement design and construction in Kosovo. Participating in a number of professional development training courses and other activities prepared him for working as an engineering manager. These activities include Delta-T leadership training, an instructor development course, a time management and organizational skills course, and the M&P Division lecture series. Leadership and skills learned through the Delta-T program were beneficial for the employee as well as the employer. For the class project, the author and his teammates performed a study dealing with improving TTI's deliverables. The Delta-T team composed a report summarizing their efforts of examining the current state of TTI's project deliverables, the deliverables' shortcomings, and potential enhancements to expand the deliverables' appeal to additional types of potential users outside the traditional research community. The team also developed a prototype web-based model of deliverables and presented some implementation recommendations. Participating in the Texas Department of Transportation's (TxDOT's) pavement surface distress data collection program enabled the author to become familiar with pavement distress data quality management and thus attain the technical and nontechnical skills required for project management. He noticed some areas for improvement in TxDOT's rater's manual, rater's training class, and acceptance criteria for visual distress data.
Chougrani, Saada; Ouhadj, Salah
2014-01-01
Quality of care is a strategic priority of any management approach in order to meet users' expectations of health care systems. This study tried to define the role of patient satisfaction surveys and the place of user in the quality of care project. The results of patient satisfaction surveys conducted between 2010 and 2012 and the draft quality of care project were analysed. Patient satisfaction surveys from 2010 to 2012 focused on logistic shortcomings. No comment was formulated about health care. Comments and suggestions did not provide any contribution in terms of patient involvement in the health care process. The multiple perspectives of quality of care include clinical care and other social objectives of respect for the individual and attention to the patient. User satisfaction as assessed by patient satisfaction surveys or patients' experiences only reflect the health professionals' representation. However, the objective is to measure what the user perceives and feels and his/her representation of the attention provided. These approaches, conducted outside of the quality of care strategic plan, only provide a basis for actions with limited or no effectiveness.
Driving Organizational Change From the Bedside: The AACN Clinical Scene Investigator Academy.
Lacey, Susan R; Goodyear-Bruch, Caryl; Olney, Adrienne; Hanson, Dave; Altman, Marian S; Varn-Davis, Natasha S; Brinker, Debbie; Lavandero, Ramón; Cox, Karen S
2017-08-01
Staff nurses are pivotal in leading change related to quality improvement efforts, although many lack skills to steer change from the bedside. The American Association of Critical-Care Nurses (AACN) staff nurse leadership program, Clinical Scene Investigator (CSI) Academy, teaches and empowers staff nurses in leadership skills and change concepts to translate evidence into practice affecting patient outcomes. To describe the curriculum of the AACN CSI Academy that provides staff nurses with the leadership skills required to create unit-based change projects that positively impact patient/family outcomes. The curriculum of the Academy included leadership topics, communication, change concepts, quality improvement methods, project management, and data management and analysis. Each team of participants collected project data to show improvements in patient care. The program evaluation used many data sources to assess the program effectiveness, relating to the professional growth of the participant nurses. The participants assessed project patient outcomes, sustainability, and spread. The first cohort of CSI participants included 164 direct care nurses from 42 hospitals in 6 cities. They rated the Academy highly in the program evaluation, and they reported that the Academy contributed to their professional development. The individual hospital quality improvement projects resulted in positive patient and estimated fiscal outcomes that were generally sustained 1 year after the program. With the skills, tools, and support obtained from participation in the CSI Academy, staff nurses can make substantial contributions to their organizations in clinical and possibly fiscal outcomes. ©2017 American Association of Critical-Care Nurses.
Exposing the Science in Citizen Science: Fitness to Purpose and Intentional Design.
Parrish, Julia K; Burgess, Hillary; Weltzin, Jake F; Fortson, Lucy; Wiggins, Andrea; Simmons, Brooke
2018-05-21
Citizen science is a growing phenomenon. With millions of people involved and billions of in-kind dollars contributed annually, this broad extent, fine grain approach to data collection should be garnering enthusiastic support in the mainstream science and higher education communities. However, many academic researchers demonstrate distinct biases against the use of citizen science as a source of rigorous information. To engage the public in scientific research, and the research community in the practice of citizen science, a mutual understanding is needed of accepted quality standards in science, and the corresponding specifics of project design and implementation when working with a broad public base. We define a science-based typology focused on the degree to which projects deliver the type(s) and quality of data/work needed to produce valid scientific outcomes directly useful in science and natural resource management. Where project intent includes direct contribution to science and the public is actively involved either virtually or hands-on, we examine the measures of quality assurance (methods to increase data quality during the design and implementation phases of a project) and quality control (post hoc methods to increase the quality of scientific outcomes). We suggest that high quality science can be produced with massive, largely one-off, participation if data collection is simple and quality control includes algorithm voting, statistical pruning and/or computational modeling. Small to mid-scale projects engaging participants in repeated, often complex, sampling can advance quality through expert-led training and well-designed materials, and through independent verification. Both approaches - simplification at scale and complexity with care - generate more robust science outcomes.
How to Begin a Quality Improvement Project.
Silver, Samuel A; Harel, Ziv; McQuillan, Rory; Weizman, Adam V; Thomas, Alison; Chertow, Glenn M; Nesrallah, Gihad; Bell, Chaim M; Chan, Christopher T
2016-05-06
Quality improvement involves a combined effort among health care staff and stakeholders to diagnose and treat problems in the health care system. However, health care professionals often lack training in quality improvement methods, which makes it challenging to participate in improvement efforts. This article familiarizes health care professionals with how to begin a quality improvement project. The initial steps involve forming an improvement team that possesses expertise in the quality of care problem, leadership, and change management. Stakeholder mapping and analysis are useful tools at this stage, and these are reviewed to help identify individuals who might have a vested interest in the project. Physician engagement is a particularly important component of project success, and the knowledge that patients/caregivers can offer as members of a quality improvement team should not be overlooked. After a team is formed, an improvement framework helps to organize the scientific process of system change. Common quality improvement frameworks include Six Sigma, Lean, and the Model for Improvement. These models are contrasted, with a focus on the Model for Improvement, because it is widely used and applicable to a variety of quality of care problems without advanced training. It involves three steps: setting aims to focus improvement, choosing a balanced set of measures to determine if improvement occurs, and testing new ideas to change the current process. These new ideas are evaluated using Plan-Do-Study-Act cycles, where knowledge is gained by testing changes and reflecting on their effect. To show the real world utility of the quality improvement methods discussed, they are applied to a hypothetical quality improvement initiative that aims to promote home dialysis (home hemodialysis and peritoneal dialysis). This provides an example that kidney health care professionals can use to begin their own quality improvement projects. Copyright © 2016 by the American Society of Nephrology.
How to Begin a Quality Improvement Project
Harel, Ziv; McQuillan, Rory; Weizman, Adam V.; Thomas, Alison; Chertow, Glenn M.; Nesrallah, Gihad; Bell, Chaim M.; Chan, Christopher T.
2016-01-01
Quality improvement involves a combined effort among health care staff and stakeholders to diagnose and treat problems in the health care system. However, health care professionals often lack training in quality improvement methods, which makes it challenging to participate in improvement efforts. This article familiarizes health care professionals with how to begin a quality improvement project. The initial steps involve forming an improvement team that possesses expertise in the quality of care problem, leadership, and change management. Stakeholder mapping and analysis are useful tools at this stage, and these are reviewed to help identify individuals who might have a vested interest in the project. Physician engagement is a particularly important component of project success, and the knowledge that patients/caregivers can offer as members of a quality improvement team should not be overlooked. After a team is formed, an improvement framework helps to organize the scientific process of system change. Common quality improvement frameworks include Six Sigma, Lean, and the Model for Improvement. These models are contrasted, with a focus on the Model for Improvement, because it is widely used and applicable to a variety of quality of care problems without advanced training. It involves three steps: setting aims to focus improvement, choosing a balanced set of measures to determine if improvement occurs, and testing new ideas to change the current process. These new ideas are evaluated using Plan-Do-Study-Act cycles, where knowledge is gained by testing changes and reflecting on their effect. To show the real world utility of the quality improvement methods discussed, they are applied to a hypothetical quality improvement initiative that aims to promote home dialysis (home hemodialysis and peritoneal dialysis). This provides an example that kidney health care professionals can use to begin their own quality improvement projects. PMID:27016497
ERIC Educational Resources Information Center
Consortium for Policy Research in Education, 2009
2009-01-01
The Strategic Management of Human Capital in Education Project was founded in 2008 with one goal: to improve student achievement dramatically in the 100 largest urban school districts. Unless teaching quality and principal leadership improve significantly, lasting education improvement is impossible. In policy terms, without "strategic management"…
McKenzie River Focus Watershed Coordination: Year-End Report 2000.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thrailkil, Jim
2000-01-01
This report summarizes accomplishments of the McKenzie River Focus Watershed Council (MWC) in the areas of coordination and administration during Fiscal Year 2000. Coordination and administration consist of prioritization and planning for projects; project management and implementation; procurement of funding for long-term support of the Council; and watershed education/outreach program for residents and local schools. Key accomplishments in the area of project planning include coordinating: monthly Council and executive committee meetings; staffing the Upper Willamette Spring Chinook Working Group; staffing the water quality technical committee; and guiding education and stewardship projects. Key accomplishments in the area of project management includemore » the completion of the McKenzie-Willamette Confluence Assessment; securing funds for project planning in the confluence area; near completion of the BPA funded McKenzie sub-basin assessment; development of a framework for a McKenzie Watershed Conservation Strategy; an evaluation of Council's monitoring programs - ambient water quality, storm-event water quality, Tier III water quality, and macroinvertebrate monitoring. The Council, in cooperation with the McKenzie River Cooperative, completed habitat enhancements in the Gate Creek and Deer Creek sub-watersheds. This partnership recently submitted Bring Back the Natives grant for initiation of projects in other McKenzie tributaries. The Council will also be working with a local business to develop a river-side riparian enhancement and native landscaping project on the lodge grounds. This will serve as a demonstration project for blending fish and wildlife habitat concerns with maintaining grounds for business opportunities. Accomplishments in the area of procurement of funding included developing the FY2000 Scope of Work and budget for approval by the Council and BPA; providing quarterly budget and work program progress reports to the Council; and securing additional funding from Council partner organizations and foundations. Highlights in the area of watershed education/outreach include the MWC's lead role in convening the Watershed Education Network for teachers as part of its educational mission; production of newsletters and brochures; and coordination of media coverage of watershed-related issues.« less
Strategy Guideline: Quality Management in Existing Homes; Cantilever Floor Example
DOE Office of Scientific and Technical Information (OSTI.GOV)
Taggart, J.; Sikora, J.; Wiehagen, J.
2011-12-01
This guideline is designed to highlight the QA process that can be applied to any residential building retrofit activity. The cantilevered floor retrofit detailed in this guideline is included only to provide an actual retrofit example to better illustrate the QA activities being presented. The goal of existing home high performing remodeling quality management systems (HPR-QMS) is to establish practices and processes that can be used throughout any remodeling project. The research presented in this document provides a comparison of a selected retrofit activity as typically done versus that same retrofit activity approached from an integrated high performance remodeling andmore » quality management perspective. It highlights some key quality management tools and approaches that can be adopted incrementally by a high performance remodeler for this or any high performance retrofit. This example is intended as a template and establishes a methodology that can be used to develop a portfolio of high performance remodeling strategies.« less
NHEERL conducts technical systems audits (TSAs) on its research projects. The findings are reported by the QA Manager (QAM) to the Director of QA (DQA) as Exemplary Findings (things the QA Team liked); Corrective Actions (things that must be corrected immediately); and Areas for...
NED-2: A decision support system for integrated forest ecosystem management
Mark J. Twery; Peter D. Knopp; Scott A. Thomasma; H. Michael Rauscher; Donald E. Nute; Walter D. Potter; Frederick Maier; Jin Wang; Mayukh Dass; Hajime Uchiyama; Astrid Glende; Robin E. Hoffman
2005-01-01
NED-2 is a Windows-based system designed to improve project-level planning and decision making by providing useful and scientifically sound information to natural resource managers. Resources currently addressed include visual quality, ecology, forest health, timber, water, and wildlife. NED-2 expands on previous versions of NED applications by integrating treatment...
NED-2: a decision support system for integrated forest ecosystem management
Mark J. Twery; Peter D. Knopp; Scott A. Thomasma; H. Michael Rauscher; Donald E. Nute; Walter D. Potter; Frederick Maier; Jin Wang; Mayukh Dass; Hajime Uchiyama; Astrid Glende; Robin E. Hoffman
2005-01-01
NED-2 is a Windows-based system designed to improve project-level planning and decision making by providing useful and scientifically sound information to natural resource managers. Resources currently addressed include visual quality, ecology, forest health, timber, water, and wildlife. NED-2 expands on previous versions of NED applications by integrating treatment...
Making Total Quality Management + Just-in-Time Manufacturing Work.
ERIC Educational Resources Information Center
Waldrop, Phillip S.; Scott, Thomas E.
2000-01-01
In one case study, teamwork was implemented in mainstream production; in a second, teamwork was applied to an ad hoc project. The cases show that process technologies and management strategies such as just-in-time are not enough; selection of the appropriate mix of individuals with complementary traits is crucial. (SK)
Makinde, Olusesan A; Ezomike, Chioma F; Lehmann, Harold P; Ibanga, Iko J
2011-11-28
To share our experience on how we used simple but detailed processes and deployed a management information system on a new HIV counseling and testing (HCT) project in Nigeria. The procedures used in this study were adopted for their strength in identifying areas of continuous improvement as the project was implemented. We used an iterative brainstorming technique among 30 participants (volunteer counselors and project management staff) as well as iterative quality audits to identify several limitations to the success of the project and to propose solutions. We then implemented the solutions and reevaluated for performance. Findings from the evaluations were then reintroduced into the brainstorming and planning sessions. Several limitations were identified with the most prominent being the poor documentation of records at the site and the lack of a document transfer trail for audit purposes. Communication, cohesion and team focus are necessary to achieve success on any new project. Institutionalizing routine HIV behavioral surveillance using data collected at HCT will help in streamlining interventions that will be evidence-based. 2011 Wolters Kluwer Health | Lippincott Williams & Wilkins
Relevance of Partnering as an Alternative Approach to Management of Construction Projects in Ghana
ERIC Educational Resources Information Center
Ansah, Samuel Kwame; Awere, Eric; Edu-Buandoh, Kobina Badu Micah
2016-01-01
Understandably, clients in both the public and the private sectors in Ghanaian construction industry have become increasingly dissatisfied. What they see is unpredictability and under-performance. What they receive is too often of poor quality, late and over-priced. More often contractors enter the construction project focusing on achieving their…
Moving towards Optimising Demand-Led Learning: The 2005-2007 ECUANET Leonardo Da Vinci Project
ERIC Educational Resources Information Center
Dealtry, Richard; Howard, Keith
2008-01-01
Purpose: The purpose of this paper is to present the key project learning points and outcomes as a guideline for the future quality management of demand-led learning and development. Design/methodology/approach: The research methodology was based upon a corporate university blueprint architecture and browser toolkit developed by a member of the…
Deer browse resources of the Atomic Energy Commission's Savannah River project area
William H. Moore
1967-01-01
A procedure developed in Georgia was used to inventory the browse resources of the Atomic Energy Commission's Savannah River Project Area near Aiken, South Carolina. Through this procedure, the forest land manager is supplied with relative carrying capacity data for deer . If silvical practices can be related to habitat quality and quantity, he can adjust...
Data-Driven Decision Making as a Tool to Improve Software Development Productivity
ERIC Educational Resources Information Center
Brown, Mary Erin
2013-01-01
The worldwide software project failure rate, based on a survey of information technology software manager's view of user satisfaction, product quality, and staff productivity, is estimated to be between 24% and 36% and software project success has not kept pace with the advances in hardware. The problem addressed by this study was the limited…
NASA Astrophysics Data System (ADS)
Alaoui, Abdallah; Schwilch, Gudrun; Barão, Lúcia; Basch, Gottlieb; Sukkel, Wijnand; Lemesle, Julie; Ferreira, Carla; Garcia-Orenes, Fuensanta; Morugan, Alicia; Mataix, Jorge; Kosmas, Costas; Glavan, Matjaž; Tóth, Brigitta; Petrutza Gate, Olga; Lipiec, Jerzy; Reintam, Endla; Xu, Minggang; Di, Jiaying; Fan, Hongzhu; Geissen, Violette
2017-04-01
Agricultural soils are under a wide variety of pressures, including from increasing global demand for food associated with population growth, changing diets, land degradation, and associated productivity reductions potentially exacerbated by climate change. To manage the use of agricultural soils well, decision-makers need science-based, easily applicable, and cost-effective tools for assessing soil quality and soil functions. Since a practical assessment of soil quality requires the integrated consideration of key soil properties and their variations in space and time, providing such tools remains a challenging task. This study aims to assess the impact of innovative agricultural management practices on soil quality in 14 study sites across Europe (10) and China (4), covering the major pedo-climatic zones. The study is part of the European H2020 project iSQAPER, which involves 25 partners across Europe and China and is coordinated by Wageningen University, The Netherlands. iSQAPER is aimed at interactive soil quality assessment in Europe and China for agricultural productivity and environmental resilience. The study began with a thorough literature analysis to inform the selection of indicators for the assessment of soil structure and soil functions. A manual was then developed in order to standardize and facilitate the task of inventorying soil quality and management practices at the case study sites. The manual provides clear and precise instructions on how to assess the 11 selected soil quality indicators based on a visual soil assessment methodology. A newly developed infiltrometer was used to easily assess the soil infiltration capacity in the field and investigate hydrodynamic flow processes. Based on consistent calibration, the infiltrometer enables reliable prediction of key soil hydraulic properties. The main aim of this inventory is to link agricultural management practices to the soil quality status at the case study sites, and to identify innovative practices that have improved soil quality. The inventory and the scoring of soil quality are done together with land users at each study site. The idea is to compare the soil quality on a farm where management practices have changed 3 or more years ago with that on a control farm where practices have not changed, with both farms located in the same pedo-climatic zone and having comparable soil conditions. The case study partners were requested to identify at least 3 newly adopted management practices (or combinations thereof) and 3 related control farms. First results show that among 88 sets of paired plots, 60 pairs (68 %) show a positive impact of innovative agricultural management practices on soil quality. 18 pairs (21 %) do not show any difference in soil quality between soils under innovative practices and soils in the control plots, and the remaining 10 plots (11 %) show an inverse effect. The non-detectable effect of the innovative practices on soil quality are due to type of tillage management, soil type and fertility that mask the effect of management practices on soil and also due to time of the assessment. This assessment will be repeated in the coming years, with the aim of providing sound data on soil quality and its improvement through innovative management practices across Europe and China.
Application fuzzy multi-attribute decision analysis method to prioritize project success criteria
NASA Astrophysics Data System (ADS)
Phong, Nguyen Thanh; Quyen, Nguyen Le Hoang Thuy To
2017-11-01
Project success is a foundation for project owner to manage and control not only for the current project but also for future potential projects in construction companies. However, identifying the key success criteria for evaluating a particular project in real practice is a challenging task. Normally, it depends on a lot of factors, such as the expectation of the project owner and stakeholders, triple constraints of the project (cost, time, quality), and company's mission, vision, and objectives. Traditional decision-making methods for measuring the project success are usually based on subjective opinions of panel experts, resulting in irrational and inappropriate decisions. Therefore, this paper introduces a multi-attribute decision analysis method (MADAM) for weighting project success criteria by using fuzzy Analytical Hierarchy Process approach. It is found that this method is useful when dealing with imprecise and uncertain human judgments in evaluating project success criteria. Moreover, this research also suggests that although cost, time, and quality are three project success criteria projects, the satisfaction of project owner and acceptance of project stakeholders with the completed project criteria is the most important criteria for project success evaluation in Vietnam.
Using NASA Products of the Water Cycle for Improved Water Resources Management
NASA Astrophysics Data System (ADS)
Toll, D. L.; Doorn, B.; Engman, E. T.; Lawford, R. G.
2010-12-01
NASA Water Resources works within the Earth sciences and GEO community to leverage investments of space-based observation and modeling results including components of the hydrologic cycle into water resources management decision support tools for the goal towards the sustainable use of water. These Earth science hydrologic related observations and modeling products provide a huge volume of valuable data in both near-real-time and extended back nearly 50 years. Observations of this type enable assessment of numerous water resources management issues including water scarcity, extreme events of drought and floods, and water quality. Examples of water cycle estimates make towards the contributions to the water management community include snow cover and snowpack, soil moisture, evapotranspiration, precipitation, streamflow and ground water. The availability of water is also contingent on the quality of water and hence water quality is an important part of NASA Water Resources. Water quality activities include both nonpoint source (agriculture land use, ecosystem disturbances, impervious surfaces, etc.) and direct remote sensing ( i.e., turbidity, algae, aquatic vegetation, temperature, etc.). . The NASA Water Resources Program organizes its projects under five functional themes: 1) stream-flow and flood forecasting; 2) water consumptive use and irrigation (includes evapotranspiration); 3) drought; 4) water quality; and 5) climate impacts on water resources. Currently NASA Water Resources is supporting 21 funded projects with 11 additional projects being concluded. To maximize the use of NASA water cycle measurements end to projects are supported with strong links with decision support systems. The NASA Water Resources Program works closely with other government agencies NOAA, USDA-FAS, USGS, AFWA, USAID, universities, and non-profit, international, and private sector organizations. International water cycle applications include: 1) Famine Early Warning System Network (FEWSNET) being expanded for famine relief to many developing nations of the world using a NASA Land Data Assimilation System (LDAS); 2) Air Force Weather Agency (AFWA) global hydrology mapping program that extends their global hydrology to much finer resolutions through use of an optimized LDAS; 3) 'SERVIR' a visualization and monitoring center of Earth science information in Central America and East Africa with plans for additional locations in developing countries of the world; 4) installing NASA Water Information System Platforms (WISPs) strategically located throughout the Middle East and North Africa (MENA) in partnerships with USAID and the World Bank; and 5) Latin American capacity building efforts within GEO.
Quality audit--a review of the literature concerning delivery of continence care.
Swaffield, J
1995-09-01
This paper outlines the role of quality audit within the framework of quality assurance, presenting the concurrent and retrospective approaches available. The literature survey provides a review of the limited audit tools available and their application to continence services and care delivery, as well as attempts to produce tools from national and local standard setting. Audit is part of a process; it can involve staff, patients and their relatives and the team of professionals providing care, as well as focusing on organizational and management levels. In an era of market delivery of services there is a need to justify why audit is important to continence advisors and managers. Effectiveness, efficiency and economics may drive the National Health Service, but quality assurance, which includes standards and audit tools, offers the means to ensure the quality of continence services and care to patients and auditing is also required in the purchaser/provider contracts for patient services. An overview and progress to date of published and other a projects in auditing continence care and service is presented. By outlining and highlighting the audit of continence service delivery and care as a basis on which to build quality assurance programmes, it is hoped that this knowledge will be shared through the setting up of a central auditing clearing project.
Relevance of ERTS-1 to the State of Ohio. [environmental monitoring and resources management
NASA Technical Reports Server (NTRS)
Sweet, D. C.; Pincura, P. G.; Wukelic, G. E. (Principal Investigator)
1974-01-01
The author has identified the following significant results. During the first year of project effort the ability of ERTS-1 imagery to be used for mapping and inventorying strip-mined areas in southeastern Ohio, the potential of using ERTS-1 imagery in water quality and coastal zone management in the Lake Erie region, and the extent that ERTS-1 imagery could contribute to localized (metropolitan/urban), multicounty, and overall state land use needs were experimentally demonstrated and reported as significant project results.
Diversity in research projects - A key to success?
NASA Astrophysics Data System (ADS)
Henkel, Daniela; Eisenhauer, Anton; Taubner, Isabelle
2017-04-01
According to demographers, psychologists, sociologists and economists diverse groups, which are groups of different race, ethnicity, gender and sexual orientation, are more innovative than homogeneous groups. This is also true for groups working together in research collaborations and international cooperation involving a culturally and functionally diverse mix of individuals who have to be integrated into an effective unit - a project team. If the goal is scientific excellence, diversity should be an essential ingredient to conduct science on high level productivity, quality and innovation. Effective teamwork is a key to project success and prime responsibilities of the project manager. Therefore, the project manager has to take into consideration different characteristics such as cultures, languages, and different values related to individual project partners. Here we show how diversity can affect the performance of a research project. Furthermore, the presentation indicates skills and abilities which are required for the management in order to deal also with the challenges of diversity in research projects. The presentation is based on insights experienced in the context of an Innovative Training Network (ITN) project within Marie Skłodowska-Curie Actions of the European HORIZON 2020 program and TRION a Collaborative Research Project in the Framework of the Trilateral Program of the German Research Foundation.
Implementing a statewide outcomes management system for consumers of public mental health services.
Clardy, J A; Booth, B M; Smith, L G; Nordquist, C R; Smith, G R
1998-02-01
The authors describe the development and implementation of an outcomes management system designed to measure outcomes and processes of care for public mental health consumers in Arkansas. The public-academic project was implemented in 1995 and is based on the Shewhart-Deming model of continuous quality improvement. All 15 community mental health centers (CMHCs) in the state participate in the project, which prospectively measures longitudinal outcomes of care for the tracer conditions of major depression and schizophrenia. Multiperspective measurement tools are used to measure patients' psychiatric status and general health status at periodic intervals; information is gathered on functioning, symptoms, severity of illness, social factors, demographic characteristics, and quality of life. A problem encountered during implementation was the relatively low rate of referral of patients with the tracer conditions for monitoring. Voluntary rather than mandatory participation in the outcomes management system by the CMHCs as well as clinicians' misperceptions about the system's purpose and concerns about confidentiality may have partly accounted for the low rate.
2012-02-23
ORLANDO, Fla. -- The winners of NASA’s Quality and Safety Achievement Recognition, or QASAR, awards for 2011 pose for a group portrait during NASA’s ninth annual Project Management Challenge. From left are Teri Hamlin, Johnson Space Center Joseph B. Hamilton, Kennedy Space Center Francis “Frank” Merceret, Kennedy Space Center and Venki Venkat, Langley Research Center. Kennedy retiree Humberto "Bert" T. Garrido, not pictured, also received the award. NASA's QASAR award recognizes individual government and contractor employees who have demonstrated exemplary performance in contributing to the quality or safety of products, services, processes, or management programs and activities. PM Challenge 2012 was held at the Caribe Royale Hotel and Convention Center in Orlando, Fla., on February 22-23, to provide a forum for all stakeholders in the project management community to meet and share stories, lessons learned and new uses of technology in the industry. The PM Challenge is sponsored by NASA's Office of the Chief Engineer. For additional information, visit http://www.nasa.gov/offices/oce/pmchallenge/index.html. Photo credit: NASA/Jim Grossmann
NASA Astrophysics Data System (ADS)
Ismail, W. N. W.; Adnan, H.; Yusuwan, N.; Maisham, M.; Hassan, A. A.
2018-02-01
The significant role of civil engineering project is not only to make the lives of people easier and secure but also to trigger the economic growth by providing infrastructure facilities as well as job opportunities. As it is dominantly initiated by government sectors, performance of the civil engineering projects is always observed. This study aims to investigate the characteristics of civil engineering project and the contractual behavior of the key participants and how do these two factors affect civil engineering projects performance. Literature reviews, content analysis and questionnaires survey were conducted to undertake the research. A total of 50 questionnaires were distributed and 10 questionnaires were returned, resulting in a 20% response rate. The research unveiled that performance of civil engineering projects are influenced greatly by the ability to handle the unpredictable character of the civil engineering projects and adequate behavioral management. Apart from that, balancing the factors with high quality of workmanship, avoidance or well managed conflicts and high satisfaction level will ensure performance in projects.
Buruk, Pelin; Şimşek, Ömer Faruk; Kocayörük, Ercan
2017-01-01
This study attempts to explain the relationship between job satisfaction and the Big Two, Stability and Plasticity, which are the higher-order traits of Big Five. Occupational Project, a narrative construct, was considered a mediator variable in this relationship. Occupational Project consists of affective and cognitive evaluations of an individual's work life as a project in terms of the completed (past), the ongoing (present) and the prospective (future) parts. The survey method was applied to a sample of 253 participants. The results supported the proposed model, in which Occupational Project mediated the relationship between the Big Two and both job satisfaction and affect in workplace. Discussion is focused on applying Occupational Project as a practical tool for management. Consideration of an employee's Occupational Project could provide management with a means to question, understand, intervene with and redefine the narrative quality of his/her occupational project that influences job satisfaction.
[Quality criteria in medicine: which limits?].
Minvielle, E
2006-06-01
This article aims to develop a critical appraisal of the criteria's development in medicine. The COMPAQH (Coordination for Measuring Performance and Assuring Quality in Hospitals) project (Ministry of Health/ High Authority of Health/ National Institute of Medical Research) helps to support this analysis. This project based on the test of 42 Quality indicators (QI) gives findings not only about the manner to build criteria, but also to interpret and diffuse results among physicians and hospital managers. Criteria must be elaborated in a pragmatic way. They must be in compliance with practice guidelines supported by scientific evidences. The associated risk is to create and develop a normative medicine. Collaboration with professional societies may be useful in preventing this risk.
Shieh, Chun-Chien; Kipritidis, John; O’Brien, Ricky T.; Kuncic, Zdenka; Keall, Paul J.
2014-01-01
Purpose: Respiratory signal, binning method, and reconstruction algorithm are three major controllable factors affecting image quality in thoracic 4D cone-beam CT (4D-CBCT), which is widely used in image guided radiotherapy (IGRT). Previous studies have investigated each of these factors individually, but no integrated sensitivity analysis has been performed. In addition, projection angular spacing is also a key factor in reconstruction, but how it affects image quality is not obvious. An investigation of the impacts of these four factors on image quality can help determine the most effective strategy in improving 4D-CBCT for IGRT. Methods: Fourteen 4D-CBCT patient projection datasets with various respiratory motion features were reconstructed with the following controllable factors: (i) respiratory signal (real-time position management, projection image intensity analysis, or fiducial marker tracking), (ii) binning method (phase, displacement, or equal-projection-density displacement binning), and (iii) reconstruction algorithm [Feldkamp–Davis–Kress (FDK), McKinnon–Bates (MKB), or adaptive-steepest-descent projection-onto-convex-sets (ASD-POCS)]. The image quality was quantified using signal-to-noise ratio (SNR), contrast-to-noise ratio, and edge-response width in order to assess noise/streaking and blur. The SNR values were also analyzed with respect to the maximum, mean, and root-mean-squared-error (RMSE) projection angular spacing to investigate how projection angular spacing affects image quality. Results: The choice of respiratory signals was found to have no significant impact on image quality. Displacement-based binning was found to be less prone to motion artifacts compared to phase binning in more than half of the cases, but was shown to suffer from large interbin image quality variation and large projection angular gaps. Both MKB and ASD-POCS resulted in noticeably improved image quality almost 100% of the time relative to FDK. In addition, SNR values were found to increase with decreasing RMSE values of projection angular gaps with strong correlations (r ≈ −0.7) regardless of the reconstruction algorithm used. Conclusions: Based on the authors’ results, displacement-based binning methods, better reconstruction algorithms, and the acquisition of even projection angular views are the most important factors to consider for improving thoracic 4D-CBCT image quality. In view of the practical issues with displacement-based binning and the fact that projection angular spacing is not currently directly controllable, development of better reconstruction algorithms represents the most effective strategy for improving image quality in thoracic 4D-CBCT for IGRT applications at the current stage. PMID:24694143