Sample records for quality planning purposes

  1. 78 FR 22501 - Designation of Areas for Air Quality Planning Purposes; State of Nevada; Total Suspended Particulate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-16

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 81 [EPA-R09-OAR-2013-0104; FRL-9802-5] Designation of Areas for Air Quality Planning Purposes; State of Nevada; Total Suspended Particulate AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to delete certain area...

  2. Quality planning in Construction Project

    NASA Astrophysics Data System (ADS)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    The purpose of this paper is to investigate deeper on the factors that contribute to the effectiveness of quality planning, identifying the common problems encountered in quality planning, practices and ways for improvements in quality planning for construction projects. This paper involves data collected from construction company representatives across Malaysia that are obtained through semi-structured interviews as well as questionnaire distributions. Results shows that design of experiments (average index: 4.61), inspection (average index: 4.45) and quality audit as well as other methods (average index: 4.26) rank first, second and third most important factors respectively.

  3. The Best Laid Plans: An Examination of School Plan Quality and Implementation in a School Improvement Initiative

    ERIC Educational Resources Information Center

    Strunk, Katharine O.; Marsh, Julie A.; Bush-Mecenas, Susan C.; Duque, Matthew R.

    2016-01-01

    Purpose: A common strategy used in school improvement efforts is a mandated process of formal planning, yet little is known about the quality of plans or the relationship between plan quality and implementation. This mixed-methods article investigates plan quality, factors associated with plan quality, and the relationship between plan quality and…

  4. Defense Depot Mechanicsburg Total Quality Management Implementation Plan

    DTIC Science & Technology

    1989-06-01

    B T I TLEE 5 . FUNDING NUMBERS Defense Depot Mechanicsburg Total Quality Management Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME...Form 298 (Rev. 2-89) L296- 102 Acces.ion For NYI J ... I:: ted DEFENSE DEPOT MECHANICSBURG PENNSYLVANIAL--I By_ TOTAL QUALITY MANAGEMENT K_~ t buty-n...IMPLEMENTATION PLAN Avmail-t!Ilty Codes IvLl c 2Dd/or JUN 3 0 1989 iDizt Special PURPOSE The purpose of this Total Quality Management Implementation

  5. 40 CFR 35.410 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants (section 205(j)(2)) § 35.410 Purpose. (a) Purpose of section. Sections 35.410 through 35.418 govern Water Quality Management Planning... the Act. (b) Purpose of program. EPA awards Water Quality Management Planning Grants to carry out...

  6. 40 CFR 35.410 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants (section 205(j)(2)) § 35.410 Purpose. (a) Purpose of section. Sections 35.410 through 35.418 govern Water Quality Management Planning... the Act. (b) Purpose of program. EPA awards Water Quality Management Planning Grants to carry out...

  7. 40 CFR 35.410 - Purpose.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants (section 205(j)(2)) § 35.410 Purpose. (a) Purpose of section. Sections 35.410 through 35.418 govern Water Quality Management Planning... the Act. (b) Purpose of program. EPA awards Water Quality Management Planning Grants to carry out...

  8. 40 CFR 35.410 - Purpose.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants (section 205(j)(2)) § 35.410 Purpose. (a) Purpose of section. Sections 35.410 through 35.418 govern Water Quality Management Planning... the Act. (b) Purpose of program. EPA awards Water Quality Management Planning Grants to carry out...

  9. 40 CFR 35.410 - Purpose.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants (section 205(j)(2)) § 35.410 Purpose. (a) Purpose of section. Sections 35.410 through 35.418 govern Water Quality Management Planning... the Act. (b) Purpose of program. EPA awards Water Quality Management Planning Grants to carry out...

  10. 242-A Evaporator quality assurance plan. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Basra, T.S.

    1995-05-04

    The purpose of this quality assurance project plan (Plan) is to provide requirements for activities pertaining to sampling, shipping, and analyses associated with candidate feed tank samples for the 242-A Evaporator project. The purpose of the 242-A Evaporator project is to reduce the volume of aqueous waste in the Double Shell Tank (DST) System and will result in considerable savings to the disposal of mixed waste. The 242-A Evaporator feed stream originates from DSTs identified as candidate feed tanks. The 242-A Evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending the condensate (calledmore » process condensate) to the Liquid Effluent Retention Facility (LEPF) storage basin where it is stored prior to treatment in the Effluent Treatment Facility (ETF). The objective of this quality assurance project plan is to provide the planning, implementation, and assessment of sample collection and analysis, data issuance, and validation activities for the candidate feed tanks.« less

  11. 7 CFR 1710.408 - Quality assurance plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE GENERAL AND PRE-LOAN POLICIES AND PROCEDURES COMMON TO ELECTRIC LOANS AND GUARANTEES Energy... accordance with quality assurance plans meeting standards designed to achieve the purposes of this subpart... pump) the new system must be designed and installed by certified and insured professionals acceptable...

  12. Simulation of textile manufacturing processes for planning, scheduling, and quality control purposes

    NASA Astrophysics Data System (ADS)

    Cropper, A. E.; Wang, Z.

    1995-08-01

    Simulation, as a management information tool, has been applied to engineering manufacture and assembly operations. The application of the principles to textile manufacturing (fiber to fabric) is discussed. The particular problems and solutions in applying the simulation software package to the yarn production processes are discussed with an indication of how the software achieves the production schedule. The system appears to have application in planning, scheduling, and quality assurance. The latter being a result of the traceability possibilities through a process involving mixing and splitting of material.

  13. Automatic treatment planning facilitates fast generation of high-quality treatment plans for esophageal cancer.

    PubMed

    Hansen, Christian Rønn; Nielsen, Morten; Bertelsen, Anders Smedegaard; Hazell, Irene; Holtved, Eva; Zukauskaite, Ruta; Bjerregaard, Jon Kroll; Brink, Carsten; Bernchou, Uffe

    2017-11-01

    The quality of radiotherapy planning has improved substantially in the last decade with the introduction of intensity modulated radiotherapy. The purpose of this study was to analyze the plan quality and efficacy of automatically (AU) generated VMAT plans for inoperable esophageal cancer patients. Thirty-two consecutive inoperable patients with esophageal cancer originally treated with manually (MA) generated volumetric modulated arc therapy (VMAT) plans were retrospectively replanned using an auto-planning engine. All plans were optimized with one full 6MV VMAT arc giving 60 Gy to the primary target and 50 Gy to the elective target. The planning techniques were blinded before clinical evaluation by three specialized oncologists. To supplement the clinical evaluation, the optimization time for the AU plan was recorded along with DVH parameters for all plans. Upon clinical evaluation, the AU plan was preferred for 31/32 patients, and for one patient, there was no difference in the plans. In terms of DVH parameters, similar target coverage was obtained between the two planning methods. The mean dose for the spinal cord increased by 1.8 Gy using AU (p = .002), whereas the mean lung dose decreased by 1.9 Gy (p < .001). The AU plans were more modulated as seen by the increase of 12% in mean MUs (p = .001). The median optimization time for AU plans was 117 min. The AU plans were in general preferred and showed a lower mean dose to the lungs. The automation of the planning process generated esophageal cancer treatment plans quickly and with high quality.

  14. DRMS (Defense Reutilization and Marketing Service) Total Quality Management (TQM) Implementation Plan

    DTIC Science & Technology

    1989-07-01

    FUNDING NUMBERS DRMS Total Quality Management (TQM) Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING...OF PAGES TOM (Total Quality Management ), Continuous Process Improvement. ’f’ - Management 16. PRICE CODE 17. SECURITY CLASSIFICATION 18. SECURITY...7540-01-280-5500 Standard Form 298 (Rev. 2-89) Pr"cried by ANi SWt 139-i 296-101 DRMS TOTAL QUALITY MANAGEMENT (TQM) IMPLEMENTATION PLAN PURPOSE The

  15. Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan : ASC software quality engineering practices Version 3.0.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Turgeon, Jennifer L.; Minana, Molly A.; Hackney, Patricia

    2009-01-01

    The purpose of the Sandia National Laboratories (SNL) Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. Quality is defined in the US Department of Energy/National Nuclear Security Agency (DOE/NNSA) Quality Criteria, Revision 10 (QC-1) as 'conformance to customer requirements and expectations'. This quality plan defines the SNL ASC Program software quality engineering (SQE) practices and provides a mapping of these practices to the SNL Corporate Process Requirement (CPR) 001.3.6; 'Corporate Software Engineering Excellence'. This plan also identifies ASC management's and themore » software project teams responsibilities in implementing the software quality practices and in assessing progress towards achieving their software quality goals. This SNL ASC Software Quality Plan establishes the signatories commitments to improving software products by applying cost-effective SQE practices. This plan enumerates the SQE practices that comprise the development of SNL ASC's software products and explains the project teams opportunities for tailoring and implementing the practices.« less

  16. Quality Assurance Plans under the Renewable Fuel Standard Program

    EPA Pesticide Factsheets

    Quality Assurance Plan or (QAP) is a voluntary program where independent third-parties may audit and verify that RINs have been properly generated and are valid for compliance purposes. RINs verified under a QAP may be purchased by regulated parties.

  17. Astronomical Instrumentation Systems Quality Management Planning: AISQMP

    NASA Astrophysics Data System (ADS)

    Goldbaum, Jesse

    2017-06-01

    The capability of small aperture astronomical instrumentation systems (AIS) to make meaningful scientific contributions has never been better. The purpose of AIS quality management planning (AISQMP) is to ensure the quality of these contributions such that they are both valid and reliable. The first step involved with AISQMP is to specify objective quality measures not just for the AIS final product, but also for the instrumentation used in its production. The next step is to set up a process to track these measures and control for any unwanted variation. The final step is continual effort applied to reducing variation and obtaining measured values near optimal theoretical performance. This paper provides an overview of AISQMP while focusing on objective quality measures applied to astronomical imaging systems.

  18. The new national ambient air quality standards in transportation planning

    DOT National Transportation Integrated Search

    2004-03-01

    The purpose of this project is to identify the strategies adopted by several states around the country for preparing to adjust their transportation planning practices to the regulatory requirements associated with designation as an air quality nonatt...

  19. 78 FR 70497 - Approval and Promulgation of Air Quality Implementation Plans; Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ...] Approval and Promulgation of Air Quality Implementation Plans; Illinois AGENCY: Environmental Protection... VOC for purposes of preparing SIPs to attain the national ambient air quality standard for ozone [email protected] . 3. Fax: (312) 692-2450. 4. Mail: Pamela Blakley, Chief, Control Strategies Section, Air...

  20. 76 FR 43598 - Approval and Promulgation of Air Quality Plans: State of Missouri

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ... Promulgation of Air Quality Plans: State of Missouri AGENCY: Environmental Protection Agency (EPA). ACTION... Control Technology (RACT) for purposes of attaining the 1997 8-hour ozone National Ambient Air Quality...-assured ozone air quality data for 2008-2010, which demonstrate that the 1997 8-hour ozone NAAQS has been...

  1. 76 FR 23196 - Approval and Promulgation of Air Quality Implementation Plans; IL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-26

    ... Promulgation of Air Quality Implementation Plans; IL AGENCY: Environmental Protection Agency (EPA). ACTION... VOC for purposes of preparing SIPs to attain the national ambient air quality standard for ozone under... Section, Air Programs Branch (AR-18J), U.S. Environmental Protection Agency, 77 West Jackson Boulevard...

  2. Considerations for using data envelopment analysis for the assessment of radiotherapy treatment plan quality.

    PubMed

    Simpson, John; Raith, Andrea; Rouse, Paul; Ehrgott, Matthias

    2017-10-09

    Purpose The operations research method of data envelopment analysis (DEA) shows promise for assessing radiotherapy treatment plan quality. The purpose of this paper is to consider the technical requirements for using DEA for plan assessment. Design/methodology/approach In total, 41 prostate treatment plans were retrospectively analysed using the DEA method. The authors investigate the impact of DEA weight restrictions with reference to the ability to differentiate plan performance at a level of clinical significance. Patient geometry influences plan quality and the authors compare differing approaches for managing patient geometry within the DEA method. Findings The input-oriented DEA method is the method of choice when performing plan analysis using the key undesirable plan metrics as the DEA inputs. When considering multiple inputs, it is necessary to constrain the DEA input weights in order to identify potential plan improvements at a level of clinical significance. All tested approaches for the consideration of patient geometry yielded consistent results. Research limitations/implications This work is based on prostate plans and individual recommendations would therefore need to be validated for other treatment sites. Notwithstanding, the method that requires both optimised DEA weights according to clinical significance and appropriate accounting for patient geometric factors is universally applicable. Practical implications DEA can potentially be used during treatment plan development to guide the planning process or alternatively used retrospectively for treatment plan quality audit. Social implications DEA is independent of the planning system platform and therefore has the potential to be used for multi-institutional quality audit. Originality/value To the authors' knowledge, this is the first published examination of the optimal approach in the use of DEA for radiotherapy treatment plan assessment.

  3. Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan. Part 1: ASC software quality engineering practices, Version 2.0.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sturtevant, Judith E.; Heaphy, Robert; Hodges, Ann Louise

    2006-09-01

    The purpose of the Sandia National Laboratories Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. The plan defines the ASC program software quality practices and provides mappings of these practices to Sandia Corporate Requirements CPR 1.3.2 and 1.3.6 and to a Department of Energy document, ASCI Software Quality Engineering: Goals, Principles, and Guidelines. This document also identifies ASC management and software project teams responsibilities in implementing the software quality practices and in assessing progress towards achieving their software quality goals.

  4. 5 CFR 531.503 - Purpose of quality step increases.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Purpose of quality step increases. 531... PAY UNDER THE GENERAL SCHEDULE Quality Step Increases § 531.503 Purpose of quality step increases. The purpose of quality step increases is to provide appropriate incentives and recognition for excellence in...

  5. 45 CFR 400.4 - Purpose of the plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Welfare Regulations Relating to Public Welfare OFFICE OF REFUGEE RESETTLEMENT, ADMINISTRATION FOR CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN SERVICES REFUGEE RESETTLEMENT PROGRAM Grants to States for Refugee Resettlement The State Plan § 400.4 Purpose of the plan. (a) In order for a State to...

  6. Noncoplanar VMAT for nasopharyngeal tumors: Plan quality versus treatment time

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wild, Esther, E-mail: e.wild@dkfz.de; Bangert, Mark; Nill, Simeon

    Purpose: The authors investigated the potential of optimized noncoplanar irradiation trajectories for volumetric modulated arc therapy (VMAT) treatments of nasopharyngeal patients and studied the trade-off between treatment plan quality and delivery time in radiation therapy. Methods: For three nasopharyngeal patients, the authors generated treatment plans for nine different delivery scenarios using dedicated optimization methods. They compared these scenarios according to dose characteristics, number of beam directions, and estimated delivery times. In particular, the authors generated the following treatment plans: (1) a 4π plan, which is a not sequenced, fluence optimized plan that uses beam directions from approximately 1400 noncoplanar directionsmore » and marks a theoretical upper limit of the treatment plan quality, (2) a coplanar 2π plan with 72 coplanar beam directions as pendant to the noncoplanar 4π plan, (3) a coplanar VMAT plan, (4) a coplanar step and shoot (SnS) plan, (5) a beam angle optimized (BAO) coplanar SnS IMRT plan, (6) a noncoplanar BAO SnS plan, (7) a VMAT plan with rotated treatment couch, (8) a noncoplanar VMAT plan with an optimized great circle around the patient, and (9) a noncoplanar BAO VMAT plan with an arbitrary trajectory around the patient. Results: VMAT using optimized noncoplanar irradiation trajectories reduced the mean and maximum doses in organs at risk compared to coplanar VMAT plans by 19% on average while the target coverage remains constant. A coplanar BAO SnS plan was superior to coplanar SnS or VMAT; however, noncoplanar plans like a noncoplanar BAO SnS plan or noncoplanar VMAT yielded a better plan quality than the best coplanar 2π plan. The treatment plan quality of VMAT plans depended on the length of the trajectory. The delivery times of noncoplanar VMAT plans were estimated to be 6.5 min in average; 1.6 min longer than a coplanar plan but on average 2.8 min faster than a noncoplanar SnS plan with comparable

  7. Astronomical Instrumentation Systems Quality Management Planning: AISQMP (Abstract)

    NASA Astrophysics Data System (ADS)

    Goldbaum, J.

    2017-12-01

    (Abstract only) The capability of small aperture astronomical instrumentation systems (AIS) to make meaningful scientific contributions has never been better. The purpose of AIS quality management planning (AISQMP) is to ensure the quality of these contributions such that they are both valid and reliable. The first step involved with AISQMP is to specify objective quality measures not just for the AIS final product, but also for the instrumentation used in its production. The next step is to set up a process to track these measures and control for any unwanted variation. The final step is continual effort applied to reducing variation and obtaining measured values near optimal theoretical performance. This paper provides an overview of AISQMP while focusing on objective quality measures applied to astronomical imaging systems.

  8. Region 7 Quality Management Plan

    EPA Pesticide Factsheets

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  9. A comprehensive comparison of IMRT and VMAT plan quality for prostate cancer treatment

    PubMed Central

    QUAN, ENZHUO M.; LI, XIAOQIANG; LI, YUPENG; WANG, XIAOCHUN; KUDCHADKER, RAJAT J.; JOHNSON, JENNIFER L.; KUBAN, DEBORAH A.; LEE, ANDREW K.; ZHANG, XIAODONG

    2013-01-01

    Purpose We performed a comprehensive comparative study of the plan quality between volumetric modulated arc therapy (VMAT) and intensity-modulated radiation therapy (IMRT) for the treatment of prostate cancer. Methods and Materials Eleven patients with prostate cancer treated at our institution were randomly selected for this study. For each patient, a VMAT plan and a series of IMRT plans using an increasing number of beams (8, 12, 16, 20, and 24 beams) were examined. All plans were generated using our in-house-developed automatic inverse planning (AIP) algorithm. An existing 8-beam clinical IMRT plan, which was used to treat the patient, was used as the reference plan. For each patient, all AIP-generated plans were optimized to achieve the same level of planning target volume (PTV) coverage as the reference plan. Plan quality was evaluated by measuring mean dose to and dose-volume statistics of the organs-at-risk, especially the rectum, from each type of plan. Results For the same PTV coverage, the AIP-generated VMAT plans had significantly better plan quality in terms of rectum sparing than the 8-beam clinical and AIP-generated IMRT plans (p < 0.0001). However, the differences between the IMRT and VMAT plans in all the dosimetric indices decreased as the number of beams used in IMRT increased. IMRT plan quality was similar or superior to that of VMAT when the number of beams in IMRT was increased to a certain number, which ranged from 12 to 24 for the set of patients studied. The superior VMAT plan quality resulted in approximately 30% more monitor units than the 8-beam IMRT plans, but the delivery time was still less than 3 minutes. Conclusions Considering the superior plan quality as well as the delivery efficiency of VMAT compared with that of IMRT, VMAT may be the preferred modality for treating prostate cancer. PMID:22704703

  10. Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan. Part 1 : ASC software quality engineering practices version 1.0.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Minana, Molly A.; Sturtevant, Judith E.; Heaphy, Robert

    2005-01-01

    The purpose of the Sandia National Laboratories (SNL) Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. Quality is defined in DOE/AL Quality Criteria (QC-1) as conformance to customer requirements and expectations. This quality plan defines the ASC program software quality practices and provides mappings of these practices to the SNL Corporate Process Requirements (CPR 1.3.2 and CPR 1.3.6) and the Department of Energy (DOE) document, ASCI Software Quality Engineering: Goals, Principles, and Guidelines (GP&G). This quality plan identifies ASC management andmore » software project teams' responsibilities for cost-effective software engineering quality practices. The SNL ASC Software Quality Plan establishes the signatories commitment to improving software products by applying cost-effective software engineering quality practices. This document explains the project teams opportunities for tailoring and implementing the practices; enumerates the practices that compose the development of SNL ASC's software products; and includes a sample assessment checklist that was developed based upon the practices in this document.« less

  11. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... and certified and approved updates to those plans. Continuing water quality planning shall be based...

  12. 76 FR 57013 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Revised Motor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... Promulgation of Air Quality Implementation Plans; West Virginia; Revised Motor Vehicle Emission Budgets for the... Implementation Plan (SIP) revision submitted by the State of West Virginia for the purpose of amending the 8-hour ozone maintenance plan for the Charleston, Huntington, Parkersburg, Weirton, and Wheeling 8-hour ozone...

  13. SU-E-T-43: A Methodology for Quality Control of IMPT Treatment Plan Based On VMAT Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jiang, S; Tianjin Medical University Cancer Institute and Hospital; Yang, Y

    Purpose: IMPT plan design is highly dependent on planner’s experiences. VMAT plan design is relatively mature and can even be automated. The quality of IMPT plan designed by in-experienced planner could be inferior to that of VMAT plan designed by experienced planner or automatic planning software. Here we introduce a method for designing IMPT plan based on VMAT plan to ensure the IMPT plan be superior to IMRT/VMAT plan for majority clinical scenario. Methods: To design a new IMPT plan, a VMAT plan is first generated either by experienced planner or by in-house developed automatic planning system. An in-house developedmore » tool is used to generate the dose volume constrains for the IMPT plan as plan template to Eclipse TPS. The beam angles for IMPT plan are selected based on the preferred angles in the VMAT plan. IMPT plan is designed by importing the plan objectives generated from VMAT plan. Majority thoracic IMPT plans are designed using this plan approach in our center. In this work, a thoracic IMPT plan under RTOG 1308 protocol is selected to demonstrate the effectiveness and efficiency of this approach. The dosimetric indices of IMPT are compared with VMAT plan. Results: The PTV D95, lung V20, MLD, mean heart dose, esophagus D1, cord D1 are 70Gy, 31%, 17.8Gy, 25.5Gy, 73Gy, 45Gy for IMPT plan and 65.3Gy, 34%, 21.6Gy, 35Gy, 74Gy, 48Gy for VMAT plan. For majority cases, the high dose region of the normal tissue which is in proximity of PTV is comparable between IMPT and VMAT plan. The low dose region of the IMPT plan is significantly better than VMAT plan. Conclusion: Using the knowledge gained in VMAT plan design can help efficiently and effectively design high quality IMPT plan. The quality of IMPT plan can be controlled to ensure the superiority of IMPT plan compared to VMAT/IMRT plan.« less

  14. WE-AB-209-07: Explicit and Convex Optimization of Plan Quality Metrics in Intensity-Modulated Radiation Therapy Treatment Planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Engberg, L; KTH Royal Institute of Technology, Stockholm; Eriksson, K

    Purpose: To formulate objective functions of a multicriteria fluence map optimization model that correlate well with plan quality metrics, and to solve this multicriteria model by convex approximation. Methods: In this study, objectives of a multicriteria model are formulated to explicitly either minimize or maximize a dose-at-volume measure. Given the widespread agreement that dose-at-volume levels play important roles in plan quality assessment, these objectives correlate well with plan quality metrics. This is in contrast to the conventional objectives, which are to maximize clinical goal achievement by relating to deviations from given dose-at-volume thresholds: while balancing the new objectives means explicitlymore » balancing dose-at-volume levels, balancing the conventional objectives effectively means balancing deviations. Constituted by the inherently non-convex dose-at-volume measure, the new objectives are approximated by the convex mean-tail-dose measure (CVaR measure), yielding a convex approximation of the multicriteria model. Results: Advantages of using the convex approximation are investigated through juxtaposition with the conventional objectives in a computational study of two patient cases. Clinical goals of each case respectively point out three ROI dose-at-volume measures to be considered for plan quality assessment. This is translated in the convex approximation into minimizing three mean-tail-dose measures. Evaluations of the three ROI dose-at-volume measures on Pareto optimal plans are used to represent plan quality of the Pareto sets. Besides providing increased accuracy in terms of feasibility of solutions, the convex approximation generates Pareto sets with overall improved plan quality. In one case, the Pareto set generated by the convex approximation entirely dominates that generated with the conventional objectives. Conclusion: The initial computational study indicates that the convex approximation outperforms the conventional

  15. [Quality planning of Family Health Units using Quality Function Deployment (QFD)].

    PubMed

    Volpato, Luciana Fernandes; Meneghim, Marcelo de Castro; Pereira, Antonio Carlos; Ambrosano, Gláucia Maria Bovi

    2010-08-01

    Quality is an indispensible requirement in the health field, and its pursuit is necessary in order to meet demands by a population that is aware of its rights, as part of the essence of good work relations, and to decrease technological costs. Quality thus involves all parties to the process (users and professionals), and is no longer merely an attribute of the health service. This study aimed to verify the possibility of quality planning in the Family Health Units, using Quality Function Deployment (QFD). QFD plans quality according to user satisfaction, involving staff professionals and identifying new approaches to improve work processes. Development of the array, called the House of Quality, is this method's most important characteristics. The results show a similarity between the quality demanded by users and the quality planned by professionals. The current study showed that QFD is an efficient tool for quality planning in public health services.

  16. Use of plan quality degradation to evaluate tradeoffs in delivery efficiency and clinical plan metrics arising from IMRT optimizer and sequencer compromises

    PubMed Central

    Wilkie, Joel R.; Matuszak, Martha M.; Feng, Mary; Moran, Jean M.; Fraass, Benedick A.

    2013-01-01

    Purpose: Plan degradation resulting from compromises made to enhance delivery efficiency is an important consideration for intensity modulated radiation therapy (IMRT) treatment plans. IMRT optimization and/or multileaf collimator (MLC) sequencing schemes can be modified to generate more efficient treatment delivery, but the effect those modifications have on plan quality is often difficult to quantify. In this work, the authors present a method for quantitative assessment of overall plan quality degradation due to tradeoffs between delivery efficiency and treatment plan quality, illustrated using comparisons between plans developed allowing different numbers of intensity levels in IMRT optimization and/or MLC sequencing for static segmental MLC IMRT plans. Methods: A plan quality degradation method to evaluate delivery efficiency and plan quality tradeoffs was developed and used to assess planning for 14 prostate and 12 head and neck patients treated with static IMRT. Plan quality was evaluated using a physician's predetermined “quality degradation” factors for relevant clinical plan metrics associated with the plan optimization strategy. Delivery efficiency and plan quality were assessed for a range of optimization and sequencing limitations. The “optimal” (baseline) plan for each case was derived using a clinical cost function with an unlimited number of intensity levels. These plans were sequenced with a clinical MLC leaf sequencer which uses >100 segments, assuring delivered intensities to be within 1% of the optimized intensity pattern. Each patient's optimal plan was also sequenced limiting the number of intensity levels (20, 10, and 5), and then separately optimized with these same numbers of intensity levels. Delivery time was measured for all plans, and direct evaluation of the tradeoffs between delivery time and plan degradation was performed. Results: When considering tradeoffs, the optimal number of intensity levels depends on the treatment

  17. 77 FR 65520 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Amendments to West...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-29

    ... Promulgation of Air Quality Implementation Plans; West Virginia; Amendments to West Virginia's Ambient Air... for the purpose of establishing amendments to Legislative Rule, 45 CSR 8--Ambient Air Quality... West Virginia Department of Environmental Protection, Division of Air Quality, 601 57th Street SE...

  18. Air Quality Implementation Plans

    EPA Pesticide Factsheets

    States must develop plans to attain and maintain air quality standards. These plans, known as SIPs, are submitted to EPA for approval. This web site contains information about this process and the current status of the submittals.

  19. 40 CFR 35.400 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Pollution Control), 205(j)(2) (Water Quality Management Planning), and 104(b)(3) (Water Quality Cooperative... quality management activities are provided in 40 CFR part 130. ... program. EPA awards these grants for the following two purposes: (1) Construction management grants. A...

  20. Do consumer reports of health plan quality affect health plan selection?

    PubMed Central

    Spranca, M; Kanouse, D E; Elliott, M; Short, P F; Farley, D O; Hays, R D

    2000-01-01

    OBJECTIVE: To learn whether consumer reports of health plan quality can affect health plan selection. DATA SOURCES: A sample of 311 privately insured adults from Los Angeles County. STUDY DESIGN: The design was a fractional factorial experiment. Consumers reviewed materials on four hypothetical health plans and selected one. The health plans varied as to cost, coverage, type of plan, ability to keep one's doctor, and quality, as measured by the Consumer Assessment of Health Plans Study (CAHPS) survey. DATA ANALYSIS: We used multinomial logistic regression to model each consumer's choice among health plans. PRINCIPAL FINDINGS: In the absence of CAHPS information, 86 percent of consumers preferred plans that covered more services, even though they cost more. When CAHPS information was provided, consumers shifted to less expensive plans covering fewer services if CAHPS ratings identified those plans as higher quality (59 percent of consumers preferred plans covering more services). Consumer choices were unaffected when CAHPS ratings identified the more expensive plans covering more services as higher quality (89 percent of consumers preferred plans covering more services). CONCLUSIONS: This study establishes that, under certain realistic conditions, CAHPS ratings could affect consumer selection of health plans and ultimately contain costs. Other studies are needed to learn how to enhance exposure and use of CAHPS information in the real world as well as to identify other conditions in which CAHPS ratings could make a difference. PMID:11130805

  1. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 6 2012-01-01 2012-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or its...

  2. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or its...

  3. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or its...

  4. TU-FG-201-10: Quality Management of Accelerated Partial Breast Irradiation (APBI) Plans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ji, H; Lorio, V; Cernica, G

    2016-06-15

    Purpose: Since 2008, over 700 patients received high dose rate (HDR) APBI treatment at Virginia Hospital Center. The complexity involved in the planning process demonstrated a broad variation between patient geometry across all applicators, in relation to anatomical regions of interest. A quality management program instituting various metrics was implemented in March 2013 with the goal of ensuring an optimal plan is achieved for each patient. Methods: For each plan, an in-house complexity index, geometric conformity index, and plan quality index were defined. These indices were obtained for all patients treated. For patients treated after the implementation, the conformity indexmore » and quality index were maximized while other dosimetric limits, such as maximum skin and rib doses, were strictly kept. Subsequently, all evaluation parameters and applicator information were placed in a database for cross-evaluation with similar complexity. Results: Both the conformity and quality indices show good correlation with the complexity index. They decrease as complexity increases for all applicators. Multi lumen type balloon applicators demonstrate a minimal advantage over single lumen applicators in increasingly complex patient geometries, as compared to SAVI applicators which showed considerably greater advantage in these circumstances. After the implementation of the in-house planning protocol, there is a direct improvement of quality for SAVI plans. Conclusion: Due to their interstitial nature, SAVI devices show a better conformity in comparison to balloon-based devices regardless of the number of lumens, especially in complex cases. The quality management program focuses on optimizing indices by utilizing prior planning knowledge based on complexity levels. The database of indices assists in decision making and has subsequently aided in balancing the experience level among planners. This approach has made APBI planning more robust for patient care, with a measurable

  5. SU-E-T-654: Quantifying Plan Quality Can Effectively Distinguish Between Competing Equivocal IMRT Prostate Plans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Price, A; Lo, J; Department of Radiology, Duke University Medical Center, Durham, NC

    2015-06-15

    Purpose: The purpose of this study was to create a prostate IMRT plan quality index (PQI) that may be used to quantitatively compare competing plans using a methodology that mimics physician preference. This methodology allows planners to choose between plans with equivocal characteristics, prior to physician scrutiny. Methods: An observer study was conducted to gather data from 3 radiation oncology physicians who ranked a set of 20 patients (each with 5 plans). The rankings were used to optimize a PQI that combined weighted portions of the rectum, bladder, and planning target volume DVHs, such that the relative PQI mimicked physicianmore » rankings as best as possible. Once optimized, a test study assessed the PQI by comparison to physician rankings in a new set of 25 patients (each with 4 plans). The physician group in the test study included 6 physicians, 5 of whom were not included in the modeling study. PQI scores were evaluated against the physicians’ rank list using Spearman rank correlation. Results: The optimized plan quality index combined the following DVH features: high dose regions above 40Gy/60Gy (rectum/bladder), organ weightings, and PTV shoulder coverage. Mean correlation of the PQI vs. physicians’ rankings in the modeling study was 0.507 (range: 0.345–0.706). By comparison, the mean correlation between physicians was 0.301 (range: 0.242–0.334). The mean correlation of the PQI vs. physician rankings in test study was 0.726 (range: 0.416–0.936), indicating robustness of the PQI by virtue of producing similar results to the modeling study. Intra-physician correlation was 0.564 (range: 0.398–0.689). Conclusion: The correlation coefficients of the PQI vs. physicians were similar to the correlation coefficients of the physicians with each other, implying that the PQI developed in this work shows promise in reflecting physician clinical preference when selecting between competing, dosimetrically equivocal plans.« less

  6. Perceptions of the Purpose and Value of the School Improvement Plan Process

    ERIC Educational Resources Information Center

    Dunaway, David M.; Kim, Do-Hong; Szad, Elizabeth R.

    2012-01-01

    The purpose of this research was to determine how teachers and administrators in a successful North Carolina district perceived the purpose and value of a school improvement plan (SIP) and the planning process. The SIP is the accepted best practice for school-wide improvement, and the perceptions of the purpose and value of the process…

  7. 30 CFR 28.31 - Quality control plans; contents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Quality control plans; contents. 28.31 Section... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.31 Quality control plans; contents. (a) Each quality control plan shall contain provisions for the management of quality, including: (1...

  8. 48 CFR 37.604 - Quality assurance surveillance plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... surveillance plans. 37.604 Section 37.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans are in Subpart 46.4. The Government may either prepare the quality assurance surveillance plan or...

  9. 48 CFR 37.604 - Quality assurance surveillance plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... surveillance plans. 37.604 Section 37.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans are in Subpart 46.4. The Government may either prepare the quality assurance surveillance plan or...

  10. 48 CFR 37.604 - Quality assurance surveillance plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... surveillance plans. 37.604 Section 37.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans are in Subpart 46.4. The Government may either prepare the quality assurance surveillance plan or...

  11. 48 CFR 37.604 - Quality assurance surveillance plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... surveillance plans. 37.604 Section 37.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans are in Subpart 46.4. The Government may either prepare the quality assurance surveillance plan or...

  12. 48 CFR 37.604 - Quality assurance surveillance plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... surveillance plans. 37.604 Section 37.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans are in Subpart 46.4. The Government may either prepare the quality assurance surveillance plan or...

  13. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... when they are needed to address water quality problems. (1) Total maximum daily loads. TMDLs in...

  14. Building Consistency between Title, Problem Statement, Purpose, & Research Questions to Improve the Quality of Research Plans and Reports

    ERIC Educational Resources Information Center

    Newman, Isadore; Covrig, Duane M.

    2013-01-01

    Consistency in the title, problem, purpose, and research question improve the logic and transparency of research. When these components of research are aligned research design and planning are more coherent and research reports are more readable. This article reviews the process for checking for and improving consistency. Numerous examples of…

  15. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...

  16. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...

  17. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...

  18. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for the...

  19. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for the...

  20. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for the...

  1. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for the...

  2. 42 CFR 84.41 - Quality control plans; contents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Quality control plans; contents. 84.41 Section 84... AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.41 Quality control plans; contents. (a) Each quality control plan shall contain provisions for the...

  3. 40 CFR 130.0 - Program summary and purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... QUALITY PLANNING AND MANAGEMENT § 130.0 Program summary and purpose. (a) This subpart establishes policies and program requirements for water quality planning, management and implementation under sections 106, 205(j), non-construction management 205(g), 208, 303 and 305 of the Clean Water Act. The Water Quality...

  4. 40 CFR 130.0 - Program summary and purpose.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... QUALITY PLANNING AND MANAGEMENT § 130.0 Program summary and purpose. (a) This subpart establishes policies and program requirements for water quality planning, management and implementation under sections 106, 205(j), non-construction management 205(g), 208, 303 and 305 of the Clean Water Act. The Water Quality...

  5. 40 CFR 130.0 - Program summary and purpose.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... QUALITY PLANNING AND MANAGEMENT § 130.0 Program summary and purpose. (a) This subpart establishes policies and program requirements for water quality planning, management and implementation under sections 106, 205(j), non-construction management 205(g), 208, 303 and 305 of the Clean Water Act. The Water Quality...

  6. 40 CFR 130.0 - Program summary and purpose.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... QUALITY PLANNING AND MANAGEMENT § 130.0 Program summary and purpose. (a) This subpart establishes policies and program requirements for water quality planning, management and implementation under sections 106, 205(j), non-construction management 205(g), 208, 303 and 305 of the Clean Water Act. The Water Quality...

  7. 33 CFR 236.1 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE WATER... QUALITY § 236.1 Purpose. This regulation provides guidance for including Environmental Quality (EQ) measures in Corps of Engineers water resource development plans. ...

  8. SU-F-P-64: The Impact of Plan Complexity Parameters On the Plan Quality and Deliverability of Volumetric Modulated Arc Therapy with Canonical Correlation Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jin, X; Yi, J; Xie, C

    Purpose: To evaluate the impact of complexity indices on the plan quality and deliverability of volumetric modulated arc therapy (VMAT), and to determine the most significant parameters in the generation of an ideal VMAT plan. Methods: A multi-dimensional exploratory statistical method, canonical correlation analysis (CCA) was adopted to study the correlations between VMAT parameters of complexity, quality and deliverability, as well as their contribution weights with 32 two-arc VMAT nasopharyngeal cancer (NPC) patients and 31 one-arc VMAT prostate cancer patients. Results: The MU per arc (MU/Arc) and MU per control point (MU/CP) of NPC were 337.8±25.2 and 3.7±0.3, respectively, whichmore » were significantly lower than those of prostate cancer patients (MU/Arc : 506.9±95.4, MU/CP : 5.6±1.1). The plan complexity indices indicated that two-arc VMAT plans were more complex than one-arc VMAT plans. Plan quality comparison confirmed that one-arc VMAT plans had a high quality than two-arc VMAT plans. CCA results implied that plan complexity parameters were highly correlated with plan quality with the first two canonical correlations of 0.96, 0.88 (both p<0.001) and significantly correlated with deliverability with the first canonical correlation of 0.79 (p<0.001), plan quality and deliverability was also correlated with the first canonical correlation of 0.71 (p=0.02). Complexity parameters of MU/CP, segment area (SA) per CP, percent of MU/CP less 3 and planning target volume (PTV) were weighted heavily in correlation with plan quality and deliveability . Similar results obtained from individual NPC and prostate CCA analysis. Conclusion: Relationship between complexity, quality, and deliverability parameters were investigated with CCA. MU, SA related parameters and PTV volume were found to have strong effect on the plan quality and deliverability. The presented correlation among different quantified parameters could be used to improve the plan quality and the

  9. A Practical Model of Development for China's National Quality Course Plan

    ERIC Educational Resources Information Center

    Long, Wang; Haklev, Stian

    2012-01-01

    The Chinese National Quality Course Plan is a large-scale project by the Ministry of Education, which has led to the production of more than 12,000 courses from some 700 universities since 2003. This paper describes in detail the purpose of the project and how it is organized at all levels, including how individual courses get selected at…

  10. 75 FR 57186 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-20

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R04-OAR-2010-0203-201035; FRL-9202-9] Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality Planning Purposes... determination that the Birmingham, Alabama, nonattainment area has attained the 24-hour fine particulate matter...

  11. SU-E-T-616: Plan Quality Assessment of Both Treatment Planning System Dose and Measurement-Based 3D Reconstructed Dose in the Patient

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olch, A

    2015-06-15

    Purpose: Systematic radiotherapy plan quality assessment promotes quality improvement. Software tools can perform this analysis by applying site-specific structure dose metrics. The next step is to similarly evaluate the quality of the dose delivery. This study defines metrics for acceptable doses to targets and normal organs for a particular treatment site and scores each plan accordingly. The input can be the TPS or the measurement-based 3D patient dose. From this analysis, one can determine whether the delivered dose distribution to the patient receives a score which is comparable to the TPS plan score, otherwise replanning may be indicated. Methods: Elevenmore » neuroblastoma patient plans were exported from Eclipse to the Quality Reports program. A scoring algorithm defined a score for each normal and target structure based on dose-volume parameters. Each plan was scored by this algorithm and the percentage of total possible points was obtained. Each plan also underwent IMRT QA measurements with a Mapcheck2 or ArcCheck. These measurements were input into the 3DVH program to compute the patient 3D dose distribution which was analyzed using the same scoring algorithm as the TPS plan. Results: The mean quality score for the TPS plans was 75.37% (std dev=14.15%) compared to 71.95% (std dev=13.45%) for the 3DVH dose distribution. For 3/11 plans, the 3DVH-based quality score was higher than the TPS score, by between 0.5 to 8.4 percentage points. Eight/11 plans scores decreased based on IMRT QA measurements by 1.2 to 18.6 points. Conclusion: Software was used to determine the degree to which the plan quality score differed between the TPS and measurement-based dose. Although the delivery score was generally in good agreement with the planned dose score, there were some that improved while there was one plan whose delivered dose quality was significantly less than planned. This methodology helps evaluate both planned and delivered dose quality. Sun Nuclear

  12. Air Quality Modeling | Air Quality Planning & Standards | US ...

    EPA Pesticide Factsheets

    2016-06-08

    The basic mission of the Office of Air Quality Planning and Standards is to preserve and improve the quality of our nation's air. One facet of accomplishing this goal requires that new and existing air pollution sources be modeled for compliance with the National Ambient Air Quality Standards (NAAQS).

  13. Is it possible for knowledge-based planning to improve intensity modulated radiation therapy plan quality for planners with different planning experiences in left-sided breast cancer patients?

    PubMed

    Wang, Juanqi; Hu, Weigang; Yang, Zhaozhi; Chen, Xiaohui; Wu, Zhiqiang; Yu, Xiaoli; Guo, Xiaomao; Lu, Saiquan; Li, Kaixuan; Yu, Gongyi

    2017-05-22

    Knowledge-based planning (KBP) is a promising technique that can improve plan quality and increase planning efficiency. However, no attempts have been made to extend the domain of KBP for planners with different planning experiences so far. The purpose of this study was to quantify the potential gains for planners with different planning experiences after implementing KBP in intensity modulated radiation therapy (IMRT) plans for left-sided breast cancer patients. The model libraries were populated with 80 expert clinical plans from treated patients who previously received left-sided breast-conserving surgery and IMRT with simultaneously integrated boost. The libraries were created on the RapidPlan TM . 6 planners with different planning experiences (2 beginner planners, 2 junior planners and 2 senior planners) generated manual and KBP optimized plans for additional 10 patients, similar to those included in the model libraries. The plan qualities were compared between manual and KBP plans. All plans were capable of achieving the prescription requirement. There were almost no statistically significant differences in terms of the planning target volume (PTV) coverage and dose conformality. It was demonstrated that the doses for most of organs-at-risk (OARs) were on average lower or equal in KBP plans compared to manual plans except for the senior planners, where the very small differences were not statistically significant. KBP data showed a systematic trend to have superior dose sparing at most parameters for the heart and ipsilateral lung. The observed decrease in the doses to these OARs could be achieved, particularly for the beginner and junior planners. Many differences were statistically significant. It is feasible to generate acceptable IMRT plans after implementing KBP for left-sided breast cancer. KBP helps to effectively improve the quality of IMRT plans against the benchmark of manual plans for less experienced planners without any manual intervention. KBP

  14. 76 FR 36873 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-23

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R04-OAR-2010-1036-201138; FRL-9322-4] Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality Planning Purposes... Atlanta, Georgia 1997 8-hour ozone nonattainment area has attained the 1997 8- hour ozone national ambient...

  15. 76 FR 31858 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-02

    ... accordance with 40 CFR 52.1004(c), suspends the requirements for this area to submit an attainment... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R04-OAR-2011-0055-201136; FRL-9313-8] Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality Planning Purposes...

  16. 40 CFR 265.51 - Purpose and implementation of contingency plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Purpose and implementation of contingency plan. 265.51 Section 265.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... contingency plan must be designed to minimize hazards to human health or the environment from fires...

  17. 40 CFR 264.51 - Purpose and implementation of contingency plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Purpose and implementation of contingency plan. 264.51 Section 264.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... plan must be designed to minimize hazards to human health or the environment from fires, explosions, or...

  18. 78 FR 16827 - Designation of Areas for Air Quality Planning Purposes; State of California; Imperial Valley...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-19

    ...EPA is proposing to clarify the description of the Imperial Valley planning area, an area designated as nonattainment for the national ambient air quality standard for particulate matter with an aerodynamic diameter of a nominal 10 microns or less (PM10). EPA is not proposing to change the boundaries of the PM10 area or the status of the area as a ``serious'' PM10 nonattainment area but is proposing to clarify the description of this partial county area in the Code of Federal Regulations.

  19. 76 FR 18650 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... determination, in accordance with 40 CFR 52.1004(c), suspends the requirements for this area to submit an... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R04-OAR-2010-0798-201048; FRL-9288-8] Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality Planning Purposes...

  20. SU-G-TeP4-14: Quality Control of Treatment Planning Using Knowledge-Based Planning Across a System of Radiation Oncology Practices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Masi, K; Ditman, M; Marsh, R

    Purpose: There is potentially a wide variation in plan quality for a certain disease site, even for clinics located in the same system of hospitals. We have used a prostate-specific knowledge-based planning (KBP) model as a quality control tool to investigate the variation in prostate treatment planning across a network of affiliated radiation oncology departments. Methods: A previously created KBP model was applied to 10 patients each from 4 community-based clinics (Clinics A, B, C, and D). The KBP model was developed using RapidPlan (Eclipse v13.5, Varian Medical Systems) from 60 prostate/prostate bed IMRT plans that were originally planned usingmore » an in-house treatment planning system at the central institution of the community-based clinics. The dosimetric plan quality (target coverage and normal-tissue sparing) of each model-generated plan was compared to the respective clinically-used plan. Each community-based clinic utilized the same planning goals to develop the clinically-used plans that were used at the main institution. Results: Across all 4 clinics, the model-generated plans decreased the mean dose to the rectum by varying amounts (on average, 12.5, 2.6, 4.5, and 2.7 Gy for Clinics A, B, C, and D, respectively). The mean dose to the bladder also decreased with the model-generated plans (5.4, 2.3, 3.0, and 4.1 Gy, respectively). The KBP model also identified that target coverage (D95%) improvements were possible for for Clinics A, B, and D (0.12, 1.65, and 2.75%) while target coverage decreased by 0.72% for Clinic C, demonstrating potentially different trade-offs made in clinical plans at different institutions. Conclusion: Quality control of dosimetric plan quality across a system of radiation oncology practices is possible with knowledge-based planning. By using a quality KBP model, smaller community-based clinics can potentially identify the areas of their treatment plans that may be improved, whether it be in normal-tissue sparing or improved

  1. Development of an integrated data base for land use and water quality planning

    NASA Technical Reports Server (NTRS)

    Adams, J.; Vanschayk, C.; Istvan, L. B.

    1977-01-01

    To help understand the role played by different land resources in water quality management a computer based data system was created. The Land Resource Information System (LRIS) allows data to be readily retrieved or statistically analyzed for a variety of purposes. It is specifically formatted to perform coordination of water quality data with logy, etc. New understanding of the region gained through the use of LRIS has gone well beyond the initial purpose of assessing water quality conditions. The land use and natural features information has provided a well defined starting point for a systematic evaluation of proposed land uses, transportation, housing, and other public investments. It has laid the foundation for a comprehensive and integrated approach to many different planning and investment programs presently underway.

  2. 76 FR 43637 - Approval and Promulgation of Air Quality Plans: State of Missouri

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ... Promulgation of Air Quality Plans: State of Missouri AGENCY: Environmental Protection Agency (EPA). ACTION...) metropolitan 8-hour ozone nonattainment area from the Clean Air Act (CAA) requirements for NO X Reasonably Available Control Technology (RACT) for purposes of attaining the 1997 8-hour ozone National Ambient Air...

  3. Quality-Assurance Plan for Water-Quality Activities in the USGS Ohio Water Science Center

    USGS Publications Warehouse

    Francy, Donna S.; Shaffer, Kimberly H.

    2008-01-01

    In accordance with guidelines set forth by the Office of Water Quality in the Water Resources Discipline of the U.S. Geological Survey, a quality-assurance plan has been written for use by the Ohio Water Science Center in conducting water-quality activities. This quality-assurance plan documents the standards, policies, and procedures used by the Ohio Water Science Center for activities related to the collection, processing, storage, analysis, and publication of water-quality data. The policies and procedures documented in this quality-assurance plan for water-quality activities are meant to complement the Ohio Water Science Center quality-assurance plans for water-quality monitors, the microbiology laboratory, and surface-water and ground-water activities.

  4. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... quality management plan. Such BMP's must reduce the amount of pollutants that enter a stream or lake by... 7 Agriculture 6 2010-01-01 2010-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality...

  5. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management plan...

  6. Quality-assurance plan and field methods for quality-of-water activities, U.S. Geological Survey, Idaho National Engineering Laboratory, Idaho

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mann, L.J.

    1996-10-01

    Water-quality activities at the Idaho National Engineering Laboratory (INEL) Project Office are part of the US Geological Survey`s (USGS) Water Resources Division (WRD) mission of appraising the quantity and quality of the Nation`s water resources. The purpose of the Quality Assurance Plan (QAP) for water-quality activities performed by the INEL Project Office is to maintain and improve the quality of technical products, and to provide a formal standardization, documentation, and review of the activities that lead to these products. The principles of this plan are as follows: (1) water-quality programs will be planned in a competent manner and activities willmore » be monitored for compliance with stated objectives and approaches; (2) field, laboratory, and office activities will be performed in a conscientious and professional manner in accordance with specified WRD practices and procedures by qualified and experienced employees who are well trained and supervised, if or when, WRD practices and procedures are inadequate, data will be collected in a manner that its quality will be documented; (3) all water-quality activities will be reviewed for completeness, reliability, credibility, and conformance to specified standards and guidelines; (4) a record of actions will be kept to document the activity and the assigned responsibility; (5) remedial action will be taken to correct activities that are deficient.« less

  7. SWiFT Software Quality Assurance Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berg, Jonathan Charles

    This document describes the software development practice areas and processes which contribute to the ability of SWiFT software developers to provide quality software. These processes are designed to satisfy the requirements set forth by the Sandia Software Quality Assurance Program (SSQAP). APPROVALS SWiFT Software Quality Assurance Plan (SAND2016-0765) approved by: Department Manager SWiFT Site Lead Dave Minster (6121) Date Jonathan White (6121) Date SWiFT Controls Engineer Jonathan Berg (6121) Date CHANGE HISTORY Issue Date Originator(s) Description A 2016/01/27 Jon Berg (06121) Initial release of the SWiFT Software Quality Assurance Plan

  8. Quality plan for a product line.

    PubMed

    Lanza, M L; Binus, G K; McMillan, F J

    1997-12-01

    Continuous Quality improvement (CQI) has undergone radical change as health care facilities merge, expand, and modify their existing services. CQI has shifted from a centralized position in health care organizations, to unit based, to product lines. This paper describes one product line's endeavors to develop a Quality Plan to direct CQI activities. One particular strength of our innovation is that the Quality Plan was developed with attention to the important balance of interdisciplinary cooperation and maintenance of appropriate discipline boundaries.

  9. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed to...

  10. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed to...

  11. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Quality control plans; filing requirements. 28... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed to...

  12. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Quality control plans; filing requirements. 28... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed to...

  13. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Quality control plans; filing requirements. 28... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed to...

  14. PLANNING QUALITY IN GEOSPATIAL PROJECTS

    EPA Science Inventory

    This presentation will briefly review some legal drivers and present a structure for the writing of geospatial Quality Assurance Projects Plans. In addition, the Geospatial Quality Council geospatial information life-cycle and sources of error flowchart will be reviewed.

  15. 78 FR 30770 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards Revision AGENCY... Illinois state implementation plan (SIP) to reflect current National Ambient Air Quality Standards (NAAQS... Implementation Plan at 35 Illinois Administrative Code part 243, which updates National Ambient Air Quality...

  16. Total Quality Management Implementation Plan.

    DTIC Science & Technology

    1989-06-01

    Quality Management Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION Defense General...E 14. SUBJECT TERMS 15. NUMBER OF PAGES TOM (Total Quality Management ), Continuous Process Improvement,_________ Depot Operations, Supply Support 16

  17. Renewing focus on family planning service quality globally.

    PubMed

    Hancock, Nancy L; Stuart, Gretchen S; Tang, Jennifer H; Chibwesha, Carla J; Stringer, Jeffrey S A; Chi, Benjamin H

    2016-01-01

    Reducing the global unmet need for contraception is currently a priority for many governments, multi-lateral initiatives, non-governmental organizations, and donors. Evidence strongly suggests that the provision of quality family planning services can increase uptake, prevalence, and continuation of contraception. While an accepted framework to define the components of family planning service quality exists, translating this framework into assessment tools that are accessible, easily utilized, and valid for service providers has remained a challenge. We propose new approaches to improve the standardization and accessibility of family planning service quality assessment tools to simplify family planning service quality evaluation. With easier approaches to program evaluation, quality improvements can be performed more swiftly to help increase uptake and continuation of contraception to improve the health of women and their families.

  18. A new plan quality index for nasopharyngeal cancer SIB IMRT.

    PubMed

    Jin, X; Yi, J; Zhou, Y; Yan, H; Han, C; Xie, C

    2014-02-01

    A new plan quality index integrating dosimetric and radiobiological indices was proposed to facilitate the evaluation and comparison of simultaneous integrated boost (SIB) intensity modulated radiotherapy (IMRT) plans for nasopharyngeal cancer (NPC) patients. Ten NPC patients treated by SIB-IMRT were enrolled in the study. Custom software was developed to read dose-volume histogram (DVH) curves from the treatment planning system (TPS). A plan filtering matrix was introduced to filter plans that fail to satisfy treatment protocol. Target plan quality indices and organ at risk (OAR) plan quality indices were calculated for qualified plans. A unique composite plan quality index (CPQI) was proposed based on the relative weight of these indices to evaluate and compare competing plans. Plan ranking results were compared with detailed statistical analysis, radiation oncology quality system (ROQS) scoring results and physician's evaluation results to verify the accuracy of this new plan quality index. The average CPQI values for plans with OAR priority of low, normal, high, and PTV only were 0.22 ± 0.08, 0.49 ± 0.077, 0.71 ± 0.062, and -0.21 ± 0.16, respectively. There were significant differences among these plan quality indices (One-way ANOVA test, p < 0.01). This was consistent with statistical analysis, ROQS results and physician's ranking results in which 90% OAR high plans were selected. Plan filtering matrix was able to speed up the plan evaluation process. The new matrix plan quality index CPQI showed good consistence with physician ranking results. It is a promising index for NPC SIB-IMRT plan evaluation. Copyright © 2013 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  19. U.S. Geological Survey quality-assurance plan for continuous water-quality monitoring in Kansas, 2014

    USGS Publications Warehouse

    Bennett, Trudy J.; Graham, Jennifer L.; Foster, Guy M.; Stone, Mandy L.; Juracek, Kyle E.; Rasmussen, Teresa J.; Putnam, James E.

    2014-01-01

    A quality-assurance plan for use in conducting continuous water-quality monitoring activities has been developed for the Kansas Water Science Center in accordance with guidelines set forth by the U.S. Geological Survey. This quality-assurance plan documents the standards, policies, and procedures used by the U.S. Geological Survey in Kansas for activities related to the collection, processing, storage, analysis, and release of continuous water-quality monitoring data. The policies and procedures that are documented in this quality-assurance plan for continuous water-quality monitoring activities complement quality-assurance plans for surface-water and groundwater activities in Kansas.

  20. 222-S Laboratory Quality Assurance Plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meznarich, H.K.

    1995-07-31

    This Quality Assurance Plan provides,quality assurance (QA) guidance, regulatory QA requirements (e.g., 10 CFR 830.120), and quality control (QC) specifications for analytical service. This document follows the U.S Department of Energy (DOE) issued Hanford Analytical Services Quality Assurance Plan (HASQAP). In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. Quality assurance elements required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAMS-004) and Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (QAMS-005) from the US Environmental Protection Agency (EPA) are covered throughout this document. A qualitymore » assurance index is provided in the Appendix A. This document also provides and/or identifies the procedural information that governs laboratory operations. The personnel of the 222-S Laboratory and the Standards Laboratory including managers, analysts, QA/QC staff, auditors, and support staff shall use this document as guidance and instructions for their operational and quality assurance activities. Other organizations that conduct activities described in this document for the 222-S Laboratory shall follow this QA/QC document.« less

  1. 42 CFR 441.474 - Quality assurance and improvement plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Quality assurance and improvement plan. 441.474... SERVICES Optional Self-Directed Personal Assistance Services Program § 441.474 Quality assurance and improvement plan. (a) The State must provide a quality assurance and improvement plan that describes the State...

  2. 42 CFR 441.474 - Quality assurance and improvement plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Quality assurance and improvement plan. 441.474... SERVICES Optional Self-Directed Personal Assistance Services Program § 441.474 Quality assurance and improvement plan. (a) The State must provide a quality assurance and improvement plan that describes the State...

  3. 42 CFR 441.474 - Quality assurance and improvement plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Quality assurance and improvement plan. 441.474... SERVICES Optional Self-Directed Personal Assistance Services Program § 441.474 Quality assurance and improvement plan. (a) The State must provide a quality assurance and improvement plan that describes the State...

  4. 42 CFR 441.474 - Quality assurance and improvement plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Quality assurance and improvement plan. 441.474... SERVICES Optional Self-Directed Personal Assistance Services Program § 441.474 Quality assurance and improvement plan. (a) The State must provide a quality assurance and improvement plan that describes the State...

  5. 42 CFR 441.474 - Quality assurance and improvement plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Quality assurance and improvement plan. 441.474... SERVICES Optional Self-Directed Personal Assistance Services Program § 441.474 Quality assurance and improvement plan. (a) The State must provide a quality assurance and improvement plan that describes the State...

  6. Automation and Intensity Modulated Radiation Therapy for Individualized High-Quality Tangent Breast Treatment Plans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Purdie, Thomas G., E-mail: Tom.Purdie@rmp.uhn.on.ca; Department of Radiation Oncology, University of Toronto, Toronto, Ontario; Techna Institute, University Health Network, Toronto, Ontario

    Purpose: To demonstrate the large-scale clinical implementation and performance of an automated treatment planning methodology for tangential breast intensity modulated radiation therapy (IMRT). Methods and Materials: Automated planning was used to prospectively plan tangential breast IMRT treatment for 1661 patients between June 2009 and November 2012. The automated planning method emulates the manual steps performed by the user during treatment planning, including anatomical segmentation, beam placement, optimization, dose calculation, and plan documentation. The user specifies clinical requirements of the plan to be generated through a user interface embedded in the planning system. The automated method uses heuristic algorithms to definemore » and simplify the technical aspects of the treatment planning process. Results: Automated planning was used in 1661 of 1708 patients receiving tangential breast IMRT during the time interval studied. Therefore, automated planning was applicable in greater than 97% of cases. The time for treatment planning using the automated process is routinely 5 to 6 minutes on standard commercially available planning hardware. We have shown a consistent reduction in plan rejections from plan reviews through the standard quality control process or weekly quality review multidisciplinary breast rounds as we have automated the planning process for tangential breast IMRT. Clinical plan acceptance increased from 97.3% using our previous semiautomated inverse method to 98.9% using the fully automated method. Conclusions: Automation has become the routine standard method for treatment planning of tangential breast IMRT at our institution and is clinically feasible on a large scale. The method has wide clinical applicability and can add tremendous efficiency, standardization, and quality to the current treatment planning process. The use of automated methods can allow centers to more rapidly adopt IMRT and enhance access to the documented

  7. 78 FR 10589 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District... Sacramento Metropolitan Air Quality Management District (SMAQMD or District) portion of the California State... sources within the areas covered by the plan as necessary to assure that the National Ambient Air Quality...

  8. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality...

  9. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to: (1...

  10. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to: (1...

  11. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1...

  12. 25 CFR 170.400 - What is the purpose of transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the purpose of transportation planning? 170.400 Section 170.400 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  13. Academics' Perceptions on the Purposes of Quality Assessment

    ERIC Educational Resources Information Center

    Rosa, Maria J.; Sarrico, Claudia S.; Amaral, Alberto

    2012-01-01

    The accountability versus improvement debate is an old one. Although being traditionally considered dichotomous purposes of higher education quality assessment, some authors defend the need of balancing both in quality assessment systems. This article goes a step further and contends that not only they should be balanced but also that other…

  14. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan being...

  15. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan being...

  16. Quality improvement initiatives: the missed opportunity for health plans.

    PubMed

    Fernandez-Lopez, Sara; Lennert, Barbara

    2009-11-01

    The increase in healthcare cost without direct improvements in health outcomes, coupled with a desire to expand access to the large uninsured population, has underscored the importance of quality initiatives and organizations that provide more affordable healthcare by maximizing value. To determine the knowledge of managed care organizations about quality organizations and initiatives and to identify potential opportunities in which pharmaceutical companies could collaborate with health plans in the development and implementation of quality initiatives. We conducted a survey of 36 pharmacy directors and 15 medical directors of different plans during a Managed Care Network meeting in 2008. The represented plans cover almost 74 million lives in commercial, Medicare, and Medicaid programs, or a combination of them. The responses show limited knowledge among pharmacy and medical directors about current quality organizations and initiatives, except for quality organizations that provide health plan quality accreditation. The results also reveal an opportunity for pharmaceutical companies to collaborate with private health plans in the development of quality initiatives, especially those related to drug utilization, such as patient adherence and education and correct drug utilization. Our survey shows clearly that today's focus for managed care organizations is mostly limited to the organizations that provide health plan quality accreditation, with less focus on other organizations.

  17. Revision 2 of the Enbridge Quality Assurance Project Plan

    EPA Pesticide Factsheets

    This Quality Assurance Project Plan (QAPP) presents Revision 2 of the organization, objectives, planned activities, and specific quality assurance/quality control (QA/QC) procedures associated with the Enbridge Marshall Pipeline Release Project.

  18. Creating a bridge between data collection and program planning: a technical assistance model to maximize the use of HIV/AIDS surveillance and service utilization data for planning purposes.

    PubMed

    Logan, Jennifer A; Beatty, Maile; Woliver, Renee; Rubinstein, Eric P; Averbach, Abigail R

    2005-12-01

    Over time, improvements in HIV/AIDS surveillance and service utilization data have increased their usefulness for planning programs, targeting resources, and otherwise informing HIV/AIDS policy. However, community planning groups, service providers, and health department staff often have difficulty in interpreting and applying the wide array of data now available. We describe the development of the Bridging Model, a technical assistance model for overcoming barriers to the use of data for program planning. Through the use of an iterative feedback loop in the model, HIV/AIDS data products constantly are evolving to better inform the decision-making tasks of their multiple users. Implementation of this model has led to improved data quality and data products and to a greater willingness and ability among stakeholders to use the data for planning purposes.

  19. SU-F-T-617: Remotely Pre-Planned Stereotactic Ablative Radiation Therapy: Validation of Treatment Plan Quality

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Juang, T; Bush, K; Loo, B

    Purpose: We propose a workflow to improve access to stereotactic ablative radiation therapy (SABR) for rural patients. When implemented, a separate trip to the central facility for simulation can be eliminated. Two elements are required: (1) Fabrication of custom immobilization devices to match positioning on prior diagnostic CT (dxCT). (2) Remote radiation pre-planning on dxCT, with transfer of contours/plan to simulation CT (simCT) and initiation of treatment same-day or next day. In this retrospective study, we validated part 2 of the workflow using patients already treated with SABR for upper lobe lung tumors. Methods: Target/normal structures were contoured on dxCT;more » a plan was created and approved by the physician. Structures were transferred to simCT using deformable image registration and the plan was re-optimized on simCT. Plan quality was evaluated through comparison to gold-standard structures contoured on simCT and a gold-standard plan based on these structures. Workflow-generated plan quality in this study represents a worst-case scenario as these patients were not treated using custom immobilization to match dxCT position as would be done when the workflow is implemented clinically. Results: 5/6 plans created through the pre-planning workflow were clinically acceptable. For all six plans, the gold-standard GTV received full prescription dose, along with median PTV V95%=95.2% and median PTV D95%=95.4%. Median GTV DSC=0.80, indicating high degree of similarity between the deformed and gold-standard GTV contours despite small GTV sizes (mean=3.0cc). One outlier (DSC=0.49) resulted in inadequate PTV coverage (V95%=62.9%) in the workflow plan; in clinical practice, this mismatch between deformed/gold-standard GTV would be revised by the physician after deformable registration. For all patients, normal tissue doses were comparable to the gold-standard plan and well within constraints. Conclusion: Pre-planning SABR cases on diagnostic imaging

  20. SU-E-T-268: Differences in Treatment Plan Quality and Delivery Between Two Commercial Treatment Planning Systems for Volumetric Arc-Based Radiation Therapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, S; Zhang, H; Zhang, B

    2015-06-15

    Purpose: To clinically evaluate the differences in volumetric modulated arc therapy (VMAT) treatment plan and delivery between two commercial treatment planning systems. Methods: Two commercial VMAT treatment planning systems with different VMAT optimization algorithms and delivery approaches were evaluated. This study included 16 clinical VMAT plans performed with the first system: 2 spine, 4 head and neck (HN), 2 brain, 4 pancreas, and 4 pelvis plans. These 16 plans were then re-optimized with the same number of arcs using the second treatment planning system. Planning goals were invariant between the two systems. Gantry speed, dose rate modulation, MLC modulation, planmore » quality, number of monitor units (MUs), VMAT quality assurance (QA) results, and treatment delivery time were compared between the 2 systems. VMAT QA results were performed using Mapcheck2 and analyzed with gamma analysis (3mm/3% and 2mm/2%). Results: Similar plan quality was achieved with each VMAT optimization algorithm, and the difference in delivery time was minimal. Algorithm 1 achieved planning goals by highly modulating the MLC (total distance traveled by leaves (TL) = 193 cm average over control points per plan), while maintaining a relatively constant dose rate (dose-rate change <100 MU/min). Algorithm 2 involved less MLC modulation (TL = 143 cm per plan), but greater dose-rate modulation (range = 0-600 MU/min). The average number of MUs was 20% less for algorithm 2 (ratio of MUs for algorithms 2 and 1 ranged from 0.5-1). VMAT QA results were similar for all disease sites except HN plans. For HN plans, the average gamma passing rates were 88.5% (2mm/2%) and 96.9% (3mm/3%) for algorithm 1 and 97.9% (2mm/2%) and 99.6% (3mm/3%) for algorithm 2. Conclusion: Both VMAT optimization algorithms achieved comparable plan quality; however, fewer MUs were needed and QA results were more robust for Algorithm 2, which more highly modulated dose rate.« less

  1. Improving plan quality for prostate volumetric-modulated arc therapy.

    PubMed

    Wright, Katrina; Ferrari-Anderson, Janet; Barry, Tamara; Bernard, Anne; Brown, Elizabeth; Lehman, Margot; Pryor, David

    2017-01-01

    We critically evaluated the quality and consistency of volumetric-modulated arc therapy (VMAT) prostate planning at a single institution to quantify objective measures for plan quality and establish clear guidelines for plan evaluation and quality assurance. A retrospective analysis was conducted on 34 plans generated on the Pinnacle 3 version 9.4 and 9.8 treatment planning system to deliver 78 Gy in 39 fractions to the prostate only using VMAT. Data were collected on contoured structure volumes, overlaps and expansions, planning target volume (PTV) and organs at risk volumes and relationship, dose volume histogram, plan conformity, plan homogeneity, low-dose wash, and beam parameters. Standard descriptive statistics were used to describe the data. Despite a standardized planning protocol, we found variability was present in all steps of the planning process. Deviations from protocol contours by radiation oncologists and radiation therapists occurred in 12% and 50% of cases, respectively, and the number of optimization parameters ranged from 12 to 27 (median 17). This contributed to conflicts within the optimization process reflected by the mean composite objective value of 0.07 (range 0.01 to 0.44). Methods used to control low-intermediate dose wash were inconsistent. At the PTV rectum interface, the dose-gradient distance from the 74.1 Gy to 40 Gy isodose ranged from 0.6 cm to 2.0 cm (median 1.0 cm). Increasing collimator angle was associated with a decrease in monitor units and a single full 6 MV arc was sufficient for the majority of plans. A significant relationship was found between clinical target volume-rectum distance and rectal tolerances achieved. A linear relationship was determined between the PTV volume and volume of 40 Gy isodose. Objective values and composite objective values were useful in determining plan quality. Anatomic geometry and overlap of structures has a measurable impact on the plan quality achieved for prostate patients

  2. Quality Improvement Initiatives: The Missed Opportunity for Health Plans

    PubMed Central

    Fernandez-Lopez, Sara; Lennert, Barbara

    2009-01-01

    Background The increase in healthcare cost without direct improvements in health outcomes, coupled with a desire to expand access to the large uninsured population, has underscored the importance of quality initiatives and organizations that provide more affordable healthcare by maximizing value. Objectives To determine the knowledge of managed care organizations about quality organizations and initiatives and to identify potential opportunities in which pharmaceutical companies could collaborate with health plans in the development and implementation of quality initiatives. Methods We conducted a survey of 36 pharmacy directors and 15 medical directors of different plans during a Managed Care Network meeting in 2008. The represented plans cover almost 74 million lives in commercial, Medicare, and Medicaid programs, or a combination of them. Results The responses show limited knowledge among pharmacy and medical directors about current quality organizations and initiatives, except for quality organizations that provide health plan quality accreditation. The results also reveal an opportunity for pharmaceutical companies to collaborate with private health plans in the development of quality initiatives, especially those related to drug utilization, such as patient adherence and education and correct drug utilization. Conclusion Our survey shows clearly that today's focus for managed care organizations is mostly limited to the organizations that provide health plan quality accreditation, with less focus on other organizations. PMID:25126303

  3. Selected approaches to determining the purpose of emergency planning zones

    NASA Astrophysics Data System (ADS)

    Dobeš, Pavel; Baudišová, Barbora; Sluka, Vilém; Skřínský, Jan; Danihelka, Pavel; Dlabka, Jakub; Řeháček, Jakub

    2013-04-01

    One of the major accident hazards (hereinafter referred to as "MAH") tools to determine the range of effects of a major accident and consequent protection of the public is the determination of the emergency planning zone (hereinafter referred to as "zone"). In the Czech Republic, the determination of the zone is regulated by the Decree No. 103/2006 Coll. laying down the principles for determination of the emergency planning zone and the extent and manner of elaborating the external emergency plan (hereinafter referred to as "Decree") 3. The Decree is based on the principles of the IAEA-TECDOC-727 method - Manual for the Classification and Prioritization of Risks Due to Major Accidents in Process and Related Industries (hereinafter referred to as "method" and "manual", respectively)3. In the manual, it is pointed out that the method used is not suitable for making emergency plans for special situations (industrial activities in an inhabited area). Nonetheless, its principles and procedures are still used for such purposes in the Czech Republic. The expert scientific community dealing with MAH issues in the Czech Republic, however, realizes that the procedure of the zone boundary delineation should be modified to reflect up-to-date knowledge in protection of the public and its enhancement. Therefore, the OPTIZON Project (Optimization of the Emergency Planning Zone Designation and Elaboration of Emergency Plans Based on Threatening Effects of Dangerous Chemical Substances at Operational Accidents with Respect to Inhabitant Protection Enhancement) was developed and approved for the Program of Security Research of the Czech Republic 2010 - 2015 (BV II/2-VS). One of the main project's objectives is to define clearly the purpose of the zone because at present it is not quite apparent. From the general view, this step may seem insignificant or trivial, but the reverse is true. It represents one of the most important stages in seeking the approach to the zone designation as

  4. Patient geometry-driven information retrieval for IMRT treatment plan quality control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wu Binbin; Ricchetti, Francesco; Sanguineti, Giuseppe

    Purpose: Intensity modulated radiation therapy (IMRT) treatment plan quality depends on the planner's level of experience and the amount of time the planner invests in developing the plan. Planners often unwittingly accept plans when further sparing of the organs at risk (OARs) is possible. The authors propose a method of IMRT treatment plan quality control that helps planners to evaluate the doses of the OARs upon completion of a new plan. Methods: It is achieved by comparing the geometric configurations of the OARs and targets of a new patient with those of prior patients, whose plans are maintained in amore » database. They introduce the concept of a shape relationship descriptor and, specifically, the overlap volume histogram (OVH) to describe the spatial configuration of an OAR with respect to a target. The OVH provides a way to infer the likely DVHs of the OARs by comparing the relative spatial configurations between patients. A database of prior patients is built to serve as an external reference. At the conclusion of a new plan, planners search through the database and identify related patients by comparing the OAR-target geometric relationships of the new patient with those of prior patients. The treatment plans of these related patients are retrieved from the database and guide planners in determining whether lower doses delivered to the OARs in the new plan are feasible. Results: Preliminary evaluation is promising. In this evaluation, they applied the analysis to the parotid DVHs of 32 prior head-and-neck patients, whose plans are maintained in a database. Each parotid was queried against the other 63 parotids to determine whether a lower dose was possible. The 17 parotids that promised the greatest reduction in D{sub 50} (DVH dose at 50% volume) were flagged. These 17 parotids came from 13 patients. The method also indicated that the doses of the other nine parotids of the 13 patients could not be reduced, so they were included in the replanning

  5. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-10

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... Implementation Plan (SIP) revision for the South Coast Air Quality Management District (SCAQMD or District... in a August 15, 2012 letter from the South Coast Air Quality Management District regarding specific...

  6. Quality Assurance Planning for Region 9

    EPA Pesticide Factsheets

    The ultimate success of an environmental program or project depends on the quality of the environmental data collected and used in decision-making. EPA has developed guidances to help state and tribal governments develop Quality Assurance Program Plans.

  7. 45 CFR 1304.60 - Deficiencies and quality improvement plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the approved Quality Improvement Plan, the responsible HHS official will issue a letter of termination... 45 Public Welfare 4 2010-10-01 2010-10-01 false Deficiencies and quality improvement plans. 1304... GRANTEE AND DELEGATE AGENCIES Implementation and Enforcement § 1304.60 Deficiencies and quality...

  8. Patient-specific dosimetric endpoints based treatment plan quality control in radiotherapy.

    PubMed

    Song, Ting; Staub, David; Chen, Mingli; Lu, Weiguo; Tian, Zhen; Jia, Xun; Li, Yongbao; Zhou, Linghong; Jiang, Steve B; Gu, Xuejun

    2015-11-07

    In intensity modulated radiotherapy (IMRT), the optimal plan for each patient is specific due to unique patient anatomy. To achieve such a plan, patient-specific dosimetric goals reflecting each patient's unique anatomy should be defined and adopted in the treatment planning procedure for plan quality control. This study is to develop such a personalized treatment plan quality control tool by predicting patient-specific dosimetric endpoints (DEs). The incorporation of patient specific DEs is realized by a multi-OAR geometry-dosimetry model, capable of predicting optimal DEs based on the individual patient's geometry. The overall quality of a treatment plan is then judged with a numerical treatment plan quality indicator and characterized as optimal or suboptimal. Taking advantage of clinically available prostate volumetric modulated arc therapy (VMAT) treatment plans, we built and evaluated our proposed plan quality control tool. Using our developed tool, six of twenty evaluated plans were identified as sub-optimal plans. After plan re-optimization, these suboptimal plans achieved better OAR dose sparing without sacrificing the PTV coverage, and the dosimetric endpoints of the re-optimized plans agreed well with the model predicted values, which validate the predictability of the proposed tool. In conclusion, the developed tool is able to accurately predict optimally achievable DEs of multiple OARs, identify suboptimal plans, and guide plan optimization. It is a useful tool for achieving patient-specific treatment plan quality control.

  9. Approved Air Quality Implementation Plans in Region 10

    EPA Pesticide Factsheets

    Landing page for information about EPA-approved air quality State Implementation Plans (SIPs), Tribal Implementation Plans (TIPs), and Federal Implementation Plans (FIPs) in Alaska, Idaho, Oregon, Washington.

  10. 77 FR 56124 - Approval and Promulgation of Air Quality Implementation Plans; Michigan; PSD and NSR Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-12

    ... Promulgation of Air Quality Implementation Plans; Michigan; PSD and NSR Regulations AGENCY: Environmental... the prevention of significant deterioration (PSD) construction permit program for the purpose of... approving Michigan's request to revise its SIP to add rule R. 336.2816 to be consistent with Federal PSD...

  11. "I Don't Want to Die like that...": The Impact of Significant Others' Death Quality on Advance Care Planning

    ERIC Educational Resources Information Center

    Carr, Deborah

    2012-01-01

    Purpose of the Study: I examine whether 5 aspects of a significant other's death quality (pain, decision-making capacity, location, problems with end-of life care, and preparation) affect whether one does advance care planning (ACP). I also identify specific aspects of others' deaths that respondents say triggered their own planning. Design and…

  12. Quality-assurance and data management plan for groundwater activities by the U.S. Geological Survey in Kansas, 2014

    USGS Publications Warehouse

    Putnam, James E.; Hansen, Cristi V.

    2014-01-01

    As the Nation’s principle earth-science information agency, the U.S. Geological Survey (USGS) is depended on to collect data of the highest quality. This document is a quality-assurance plan for groundwater activities (GWQAP) of the Kansas Water Science Center. The purpose of this GWQAP is to establish a minimum set of guidelines and practices to be used by the Kansas Water Science Center to ensure quality in groundwater activities. Included within these practices are the assignment of responsibilities for implementing quality-assurance activities in the Kansas Water Science Center and establishment of review procedures needed to ensure the technical quality and reliability of the groundwater products. In addition, this GWQAP is intended to complement quality-assurance plans for surface-water and water-quality activities and similar plans for the Kansas Water Science Center and general project activities throughout the USGS. This document provides the framework for collecting, analyzing, and reporting groundwater data that are quality assured and quality controlled. This GWQAP presents policies directing the collection, processing, analysis, storage, review, and publication of groundwater data. In addition, policies related to organizational responsibilities, training, project planning, and safety are presented. These policies and practices pertain to all groundwater activities conducted by the Kansas Water Science Center, including data-collection programs, interpretive and research projects. This report also includes the data management plan that describes the progression of data management from data collection to archiving and publication.

  13. Quality assurance program plan for radionuclide airborne emissions monitoring

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boom, R.J.

    1995-12-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of radiological airborne emissions. This Quality Assurance Program Plan is prepared in accordance with and to written requirements.

  14. A Preliminary Study on the Effects of Training Using Behavior Support Plan Quality Evaluation Guide (BSP-QE) to Improve Positive Behavioral Support Plans

    ERIC Educational Resources Information Center

    Wright, Diana Browning; Mayer, G. Roy; Cook, Clayton R.; Crews, S. Dean; Kraemer, Bonnie Rawlings; Gale, Bruce

    2007-01-01

    The purpose of this research was to evaluate the effects of two trainings designed to increase the competencies of professionals to develop high quality positive behavior support plans for students that engage in problem behaviors that interfere with theirs and/or others' ability to learn. Training one consisted of training attendees on six key…

  15. Quality-assurance plan for water-quality activities in the U.S. Geological Survey Washington Water Science Center

    USGS Publications Warehouse

    Conn, Kathleen E.; Huffman, Raegan L.; Barton, Cynthia

    2017-05-08

    In accordance with guidelines set forth by the Office of Water Quality in the Water Mission Area of the U.S. Geological Survey, a quality-assurance plan has been created for use by the Washington Water Science Center (WAWSC) in conducting water-quality activities. This qualityassurance plan documents the standards, policies, and procedures used by the WAWSC for activities related to the collection, processing, storage, analysis, and publication of water-quality data. The policies and procedures documented in this quality-assurance plan for water-quality activities complement the quality-assurance plans for surface-water and groundwater activities at the WAWSC.

  16. Quality-Assurance Plan for Water-Quality Activities of the U.S. Geological Survey Montana Water Science Center

    USGS Publications Warehouse

    Lambing, John H.

    2006-01-01

    In accordance with guidelines set forth by the Office of Water Quality in the Water Resources Discipline of the U.S. Geological Survey (USGS), a quality-assurance plan has been created for use by the USGS Montana Water Science Center in conducting water-quality activities. This quality-assurance plan documents the standards, policies, and procedures used by the USGS Montana Water Science Center for activities related to the collection, processing, storage, analysis, and publication of water-quality data. The policies and procedures presented in this quality-assurance plan for water-quality activities complement the quality-assurance plans for surface-water and ground-water activities and suspended-sediment analysis.

  17. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality management planning. Before grant assistance can be awarded for any treatment works project, the Regional... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management planning. 35...

  18. Total Quality Management Office for Contracting Integrity Implementation Plan

    DTIC Science & Technology

    1989-07-01

    REPORT______ANDDATESCOVERED 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total Quality Management Office for Contracting Integrity Implementatiun Plan 6. AUTHOR(S) 7...01-280-5500 Standard Form 298 (Rev. 2-89) P’,croed 1:, ANSI Std 3J9-16 29d. 102 4 TOTAL QUALITY MANAGEMENT OFFICE FOR CONTRACTING INTEGRITY...IMPLEMENTATION PLAN According to the Total Quality Management (TQM) Master Plan, each PSE head, supported by Working Groups, will implement the HQ DLA Master

  19. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Water quality management planning. 35.2102 Section 35.2102 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality management planning. Before grant...

  20. 40 CFR 1501.1 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... at an early stage the significant environmental issues deserving of study and deemphasizing insignificant issues, narrowing the scope of the environmental impact statement accordingly. (e) Providing a... Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY NEPA AND AGENCY PLANNING § 1501.1 Purpose. The...

  1. 30 CFR 28.32 - Proposed quality control plans; approval by MSHA.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Proposed quality control plans; approval by...-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.32 Proposed quality control plans; approval by MSHA. (a) Each proposed quality control plan submitted in accordance with this...

  2. 30 CFR 28.32 - Proposed quality control plans; approval by MSHA.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.32 Proposed quality control plans; approval by MSHA. (a) Each proposed quality control plan submitted in accordance with this... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Proposed quality control plans; approval by...

  3. 30 CFR 28.32 - Proposed quality control plans; approval by MSHA.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.32 Proposed quality control plans; approval by MSHA. (a) Each proposed quality control plan submitted in accordance with this... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Proposed quality control plans; approval by...

  4. 30 CFR 28.32 - Proposed quality control plans; approval by MSHA.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.32 Proposed quality control plans; approval by MSHA. (a) Each proposed quality control plan submitted in accordance with this... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Proposed quality control plans; approval by...

  5. 77 FR 52277 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-29

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... rule. SUMMARY: EPA is proposing approval of a permitting rule submitted for the South Coast Air Quality Management District (District) portion of the California State Implementation Plan (SIP). The State is...

  6. 78 FR 30829 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards Revision AGENCY... the Illinois State Implementation Plan (SIP) to reflect current national ambient air quality standards...) 692-2450. 4. Mail: Pamela Blakley, Chief, Control Strategies Section, Air Programs Branch (AR-18J), U...

  7. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Water quality management planning. 35.2023 Section 35.2023 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality management planning. (a) From funds...

  8. Quality-assurance and data-management plan for water-quality activities in the Kansas Water Science Center, 2014

    USGS Publications Warehouse

    Rasmussen, Teresa J.; Bennett, Trudy J.; Foster, Guy M.; Graham, Jennifer L.; Putnam, James E.

    2014-01-01

    As the Nation’s largest water, earth, and biological science and civilian mapping information agency, the U.S. Geological Survey is relied on to collect high-quality data, and produce factual and impartial interpretive reports. This quality-assurance and data-management plan provides guidance for water-quality activities conducted by the Kansas Water Science Center. Policies and procedures are documented for activities related to planning, collecting, storing, documenting, tracking, verifying, approving, archiving, and disseminating water-quality data. The policies and procedures described in this plan complement quality-assurance plans for continuous water-quality monitoring, surface-water, and groundwater activities in Kansas.

  9. 36 CFR 230.36 - State priority plan-purpose and scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...—purpose and scope. (a) The State priority plan shall be used to guide FLEP implementation in each... describe the various roles and responsibilities of the State Forester, State Forest Stewardship... private forest and agroforestry resources; (3) Identification of the desired objectives and environmental...

  10. The Relationship between Health Plan Performance Measures and Physician Network Overlap: Implications for Measuring Plan Quality

    PubMed Central

    Maeng, Daniel D; Scanlon, Dennis P; Chernew, Michael E; Gronniger, Tim; Wodchis, Walter P; McLaughlin, Catherine G

    2010-01-01

    Objective To examine the extent to which health plan quality measures capture physician practice patterns rather than plan characteristics. Data Source We gathered and merged secondary data from the following four sources: a private firm that collected information on individual physicians and their health plan affiliations, The National Committee for Quality Assurance, InterStudy, and the Dartmouth Atlas. Study Design We constructed two measures of physician network overlap for all health plans in our sample and linked them to selected measures of plan performance. Two linear regression models were estimated to assess the relationship between the measures of physician network overlap and the plan performance measures. Principal Findings The results indicate that in the presence of a higher degree of provider network overlap, plan performance measures tend to converge to a lower level of quality. Conclusions Standard health plan performance measures reflect physician practice patterns rather than plans' effort to improve quality. This implies that more provider-oriented measurement, such as would be possible with accountable care organizations or medical homes, may facilitate patient decision making and provide further incentives to improve performance. PMID:20403064

  11. Leading quality through the development of a multi-year corporate quality plan: sharing The Ottawa Hospital experience.

    PubMed

    Hunter, Linda; Myles, Joanne; Worthington, James R; Lebrun, Monique

    2011-01-01

    This article discusses the background and process for developing a multi-year corporate quality plan. The Ottawa Hospital's goal is to be a top 10% performer in quality and patient safety in North America. In order to create long-term measurable and sustainable changes in the quality of patient care, The Ottawa Hospital embarked on the development of a three-year strategic corporate quality plan. This was accomplished by engaging the organization at all levels and defining quality frameworks, aligning with internal and external expectations, prioritizing strategic goals, articulating performance measurements and reporting to stakeholders while maintaining a transparent communication process. The plan was developed through an iterative process that engaged a broad base of health professionals, physicians, support staff, administration and senior management. A literature review of quality frameworks was undertaken, a Quality Plan Working Group was established, 25 key stakeholder interviews were conducted and 48 clinical and support staff consultations were held. The intent was to gather information on current quality initiatives and challenges encountered and to prioritize corporate goals and then create the quality plan. Goals were created and then prioritized through an affinity exercise. Action plans were developed for each goal and included objectives, tasks and activities, performance measures (structure, process and outcome), accountabilities and timelines. This collaborative methodology resulted in the development of a three-year quality plan. Six corporate goals were outlined by the tenets of the quality framework for The Ottawa Hospital: access to care, appropriate care (effective and efficient), safe care and satisfaction with care. Each of the six corporate goals identified objectives and supporting action plans with accountabilities outlining what would be accomplished in years one, two and three. The three-year quality plan was approved by senior

  12. Plan-provider integration, premiums, and quality in the Medicare Advantage market.

    PubMed

    Frakt, Austin B; Pizer, Steven D; Feldman, Roger

    2013-12-01

    To investigate how integration between Medicare Advantage plans and health care providers is related to plan premiums and quality ratings. We used public data from the Centers for Medicare and Medicaid Services (CMS) and the Area Resource File and private data from one large insurer. Premiums and quality ratings are from 2009 CMS administrative files and some control variables are historical. We estimated ordinary least-squares models for premiums and plan quality ratings, with state fixed effects and firm random effects. The key independent variable was an indicator of plan-provider integration. With the exception of Medigap premium data, all data were publicly available. We ascertained plan-provider integration through examination of plans' websites and governance documents. We found that integrated plan-providers charge higher premiums, controlling for quality. Such plans also have higher quality ratings. We found no evidence that integration is associated with more generous benefits. Current policy encourages plan-provider integration, although potential effects on health insurance products and markets are uncertain. Policy makers and regulators may want to closely monitor changes in premiums and quality after integration and consider whether quality improvement (if any) justifies premium increases (if they occur). © Health Research and Educational Trust.

  13. DESC (Defense Electronics Supply Center) Total Quality Management Plan

    DTIC Science & Technology

    1989-04-01

    Paoerwort Reduction Proodt(0704.01 ge. Washington. DC 20S03 4. TITLE AND SUBTITLE Api598 . FUNDING NUMBERS DESC Total Quality Management Master Plan...OF PAGES TQM (Total Quality Management ), Continuous Process Improvement,_________ cTainingManagement 16. PRICE CODE 17. SECURITY CLASSIFICATION 18... QUALITY MANAGEMENT As you read the DESC Total Quality Management Plan, I ask each of you to make a commitment to continuously strive for improvement

  14. Elaborating the Purpose and Content of Professional Development Plan for Preschool Teachers

    ERIC Educational Resources Information Center

    zareie, Mohammad Hossein; Nasr, Ahmad Reza; Mirshahjafari, Seyyed Ebrahim; Liaghatdar, Mohammad Javad

    2016-01-01

    Professional development of educators, especially in preschool years has been neglected in Iran. The purpose of this study was to investigate the viewpoints of experts and teachers about the purposes and content of the professional development plan for preschool teachers. This research is a descriptive-analytic study conducted through both…

  15. Quality Care for School-Age Children: A Self-Instructional Guide To Help Staff Plan and Implement a Quality Program for School-Age Children.

    ERIC Educational Resources Information Center

    Childcare Resources, Birmingham, AL.

    The purpose of this manual is to provide school-age child care center staff in Alabama with information about school-age children that facilitates program planning and provides a basis for implementing and evaluating a high quality school-age child care (SACC) program. Sections of the manual discuss: (1) teacher competencies addressed by the…

  16. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... quality improvement. These measures are not eligible for cost sharing under this program. The installation... Conservation Service will certify as to the technical adequacy of the water-quality plan. (g) The soil...

  17. Fit for purpose quality management system for military forensic exploitation.

    PubMed

    Wilson, Lauren Elizabeth; Gahan, Michelle Elizabeth; Robertson, James; Lennard, Chris

    2018-03-01

    In a previous publication we described a systems approach to forensic science applied in the military domain. The forensic science 'system of systems' describes forensic science as a sub-system in the larger criminal justice, law enforcement, intelligence, and military systems, with quality management being an important supporting system. Quality management systems help to ensure that organisations achieve their objective and continually improve their capability. Components of forensic science quality management systems can include standardisation of processes, accreditation of facilities to national/international standards, and certification of personnel. A fit for purpose quality management system should be balanced to allow organisations to meet objectives, provide continuous improvement; mitigate risk; and impart a positive quality culture. Considerable attention over the last decades has been given to the need for forensic science quality management systems to meet criminal justice and law enforcement objectives. More recently, the need for the forensic quality management systems to meet forensic intelligence objectives has been considered. This paper, for the first time, discusses the need for a fit for purpose quality management system for military forensic exploitation. Crown Copyright © 2018. Published by Elsevier B.V. All rights reserved.

  18. Noncoplanar VMAT for nasopharyngeal tumors: Plan quality versus treatment time.

    PubMed

    Wild, Esther; Bangert, Mark; Nill, Simeon; Oelfke, Uwe

    2015-05-01

    The authors investigated the potential of optimized noncoplanar irradiation trajectories for volumetric modulated arc therapy (VMAT) treatments of nasopharyngeal patients and studied the trade-off between treatment plan quality and delivery time in radiation therapy. For three nasopharyngeal patients, the authors generated treatment plans for nine different delivery scenarios using dedicated optimization methods. They compared these scenarios according to dose characteristics, number of beam directions, and estimated delivery times. In particular, the authors generated the following treatment plans: (1) a 4π plan, which is a not sequenced, fluence optimized plan that uses beam directions from approximately 1400 noncoplanar directions and marks a theoretical upper limit of the treatment plan quality, (2) a coplanar 2π plan with 72 coplanar beam directions as pendant to the noncoplanar 4π plan, (3) a coplanar VMAT plan, (4) a coplanar step and shoot (SnS) plan, (5) a beam angle optimized (BAO) coplanar SnS IMRT plan, (6) a noncoplanar BAO SnS plan, (7) a VMAT plan with rotated treatment couch, (8) a noncoplanar VMAT plan with an optimized great circle around the patient, and (9) a noncoplanar BAO VMAT plan with an arbitrary trajectory around the patient. VMAT using optimized noncoplanar irradiation trajectories reduced the mean and maximum doses in organs at risk compared to coplanar VMAT plans by 19% on average while the target coverage remains constant. A coplanar BAO SnS plan was superior to coplanar SnS or VMAT; however, noncoplanar plans like a noncoplanar BAO SnS plan or noncoplanar VMAT yielded a better plan quality than the best coplanar 2π plan. The treatment plan quality of VMAT plans depended on the length of the trajectory. The delivery times of noncoplanar VMAT plans were estimated to be 6.5 min in average; 1.6 min longer than a coplanar plan but on average 2.8 min faster than a noncoplanar SnS plan with comparable treatment plan quality. The authors

  19. Machine-Specific Magnetic Resonance Imaging Quality Control Procedures for Stereotactic Radiosurgery Treatment Planning

    PubMed Central

    Taghizadeh, Somayeh; Yang, Claus Chunli; R. Kanakamedala, Madhava; Morris, Bart; Vijayakumar, Srinivasan

    2017-01-01

    Purpose Magnetic resonance (MR) images are necessary for accurate contouring of intracranial targets, determination of gross target volume and evaluation of organs at risk during stereotactic radiosurgery (SRS) treatment planning procedures. Many centers use magnetic resonance imaging (MRI) simulators or regular diagnostic MRI machines for SRS treatment planning; while both types of machine require two stages of quality control (QC), both machine- and patient-specific, before use for SRS, no accepted guidelines for such QC currently exist. This article describes appropriate machine-specific QC procedures for SRS applications. Methods and materials We describe the adaptation of American College of Radiology (ACR)-recommended QC tests using an ACR MRI phantom for SRS treatment planning. In addition, commercial Quasar MRID3D and Quasar GRID3D phantoms were used to evaluate the effects of static magnetic field (B0) inhomogeneity, gradient nonlinearity, and a Leksell G frame (SRS frame) and its accessories on geometrical distortion in MR images. Results QC procedures found in-plane distortions (Maximum = 3.5 mm, Mean = 0.91 mm, Standard deviation = 0.67 mm, >2.5 mm (%) = 2) in X-direction (Maximum = 2.51 mm, Mean = 0.52 mm, Standard deviation = 0.39 mm, > 2.5 mm (%) = 0) and in Y-direction (Maximum = 13. 1 mm , Mean = 2.38 mm, Standard deviation = 2.45 mm, > 2.5 mm (%) = 34) in Z-direction and < 1 mm distortion at a head-sized region of interest. MR images acquired using a Leksell G frame and localization devices showed a mean absolute deviation of 2.3 mm from isocenter. The results of modified ACR tests were all within recommended limits, and baseline measurements have been defined for regular weekly QC tests. Conclusions With appropriate QC procedures in place, it is possible to routinely obtain clinically useful MR images suitable for SRS treatment planning purposes. MRI examination for SRS planning can benefit from the improved localization and planning possible

  20. Machine-Specific Magnetic Resonance Imaging Quality Control Procedures for Stereotactic Radiosurgery Treatment Planning.

    PubMed

    Fatemi, Ali; Taghizadeh, Somayeh; Yang, Claus Chunli; R Kanakamedala, Madhava; Morris, Bart; Vijayakumar, Srinivasan

    2017-12-18

    Purpose Magnetic resonance (MR) images are necessary for accurate contouring of intracranial targets, determination of gross target volume and evaluation of organs at risk during stereotactic radiosurgery (SRS) treatment planning procedures. Many centers use magnetic resonance imaging (MRI) simulators or regular diagnostic MRI machines for SRS treatment planning; while both types of machine require two stages of quality control (QC), both machine- and patient-specific, before use for SRS, no accepted guidelines for such QC currently exist. This article describes appropriate machine-specific QC procedures for SRS applications. Methods and materials We describe the adaptation of American College of Radiology (ACR)-recommended QC tests using an ACR MRI phantom for SRS treatment planning. In addition, commercial Quasar MRID 3D and Quasar GRID 3D phantoms were used to evaluate the effects of static magnetic field (B 0 ) inhomogeneity, gradient nonlinearity, and a Leksell G frame (SRS frame) and its accessories on geometrical distortion in MR images. Results QC procedures found in-plane distortions (Maximum = 3.5 mm, Mean = 0.91 mm, Standard deviation = 0.67 mm, >2.5 mm (%) = 2) in X-direction (Maximum = 2.51 mm, Mean = 0.52 mm, Standard deviation = 0.39 mm, > 2.5 mm (%) = 0) and in Y-direction (Maximum = 13. 1 mm , Mean = 2.38 mm, Standard deviation = 2.45 mm, > 2.5 mm (%) = 34) in Z-direction and < 1 mm distortion at a head-sized region of interest. MR images acquired using a Leksell G frame and localization devices showed a mean absolute deviation of 2.3 mm from isocenter. The results of modified ACR tests were all within recommended limits, and baseline measurements have been defined for regular weekly QC tests. Conclusions With appropriate QC procedures in place, it is possible to routinely obtain clinically useful MR images suitable for SRS treatment planning purposes. MRI examination for SRS planning can benefit from the improved localization and planning

  1. Explicit optimization of plan quality measures in intensity-modulated radiation therapy treatment planning.

    PubMed

    Engberg, Lovisa; Forsgren, Anders; Eriksson, Kjell; Hårdemark, Björn

    2017-06-01

    To formulate convex planning objectives of treatment plan multicriteria optimization with explicit relationships to the dose-volume histogram (DVH) statistics used in plan quality evaluation. Conventional planning objectives are designed to minimize the violation of DVH statistics thresholds using penalty functions. Although successful in guiding the DVH curve towards these thresholds, conventional planning objectives offer limited control of the individual points on the DVH curve (doses-at-volume) used to evaluate plan quality. In this study, we abandon the usual penalty-function framework and propose planning objectives that more closely relate to DVH statistics. The proposed planning objectives are based on mean-tail-dose, resulting in convex optimization. We also demonstrate how to adapt a standard optimization method to the proposed formulation in order to obtain a substantial reduction in computational cost. We investigated the potential of the proposed planning objectives as tools for optimizing DVH statistics through juxtaposition with the conventional planning objectives on two patient cases. Sets of treatment plans with differently balanced planning objectives were generated using either the proposed or the conventional approach. Dominance in the sense of better distributed doses-at-volume was observed in plans optimized within the proposed framework. The initial computational study indicates that the DVH statistics are better optimized and more efficiently balanced using the proposed planning objectives than using the conventional approach. © 2017 American Association of Physicists in Medicine.

  2. Checklist for Reviewing EPA Quality Management Plans

    EPA Pesticide Factsheets

    This checklist will be used to review the Quality Management Plans (QMPs) that are submitted to the Quality Staff of the Office of Environmental Information (OEI) for Agency review under EPA Order 5360.1 A2.

  3. A global quality assurance system for personalized radiation therapy treatment planning for the prostate (or other sites)

    NASA Astrophysics Data System (ADS)

    Nwankwo, Obioma; Sihono, Dwi Seno K.; Schneider, Frank; Wenz, Frederik

    2014-09-01

    Introduction: the quality of radiotherapy treatment plans varies across institutions and depends on the experience of the planner. For the purpose of intra- and inter-institutional homogenization of treatment plan quality, we present an algorithm that learns the organs-at-risk (OARs) sparing patterns from a database of high quality plans. Thereafter, the algorithm predicts the dose that similar organs will receive in future radiotherapy plans prior to treatment planning on the basis of the anatomies of the organs. The predicted dose provides the basis for the individualized specification of planning objectives, and for the objective assessment of the quality of radiotherapy plans. Materials and method: one hundred and twenty eight (128) Volumetric Modulated Arc Therapy (VMAT) plans were selected from a database of prostate cancer plans. The plans were divided into two groups, namely a training set that is made up of 95 plans and a validation set that consists of 33 plans. A multivariate analysis technique was used to determine the relationships between the positions of voxels and their dose. This information was used to predict the likely sparing of the OARs of the plans of the validation set. The predicted doses were visually and quantitatively compared to the reference data using dose volume histograms, the 3D dose distribution, and a novel evaluation metric that is based on the dose different test. Results: a voxel of the bladder on the average receives a higher dose than a voxel of the rectum in optimized radiotherapy plans for the treatment of prostate cancer in our institution if both voxels are at the same distance to the PTV. Based on our evaluation metric, the predicted and reference dose to the bladder agree to within 5% of the prescribed dose to the PTV in 18 out of 33 cases, while the predicted and reference doses to the rectum agree to within 5% in 28 out of the 33 plans of the validation set. Conclusion: We have described a method to predict the

  4. 40 CFR 64.8 - Quality improvement plan (QIP) requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Quality improvement plan (QIP) requirements. 64.8 Section 64.8 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.8 Quality improvement plan (QIP) requirements. (a...

  5. 40 CFR 64.8 - Quality improvement plan (QIP) requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Quality improvement plan (QIP) requirements. 64.8 Section 64.8 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.8 Quality improvement plan (QIP) requirements. (a...

  6. Defense Depot Tracy Total Quality Management Plan

    DTIC Science & Technology

    1989-07-01

    PAGES TQM (Total Quality Management ), Depot Operations, Continuous Process Improvement 16. PRICE CODE 17. SECURITY CLASSIFICATION 18. SECURITY...make up our pcrceptions of Total Quality Management . Our goal is to improve those proven management processes that have brought us success while being...MANIAGEMENT F. QUALITY AUDITS OF PRODUCTS AND OPERATIONS ASSETS MANAGEMENT 00 i .......... / ~899 29 03 1 EFENSE DEPOT TACY TOTAL QUALITY MANAGEMENT PLAN

  7. Office of General Counsel Total Quality Management Plan

    DTIC Science & Technology

    1989-07-01

    20503. IRT DATE 3. REPORT TYPE AND DATES COVERED y 1989 5. FUNDING NUMBERS Office of General Counsel Total Quality Management Plan 6. AUTHOR(S) 7...of General Counsel. - r DTIC 65 LE- E CTEn’" SEP291 989 14. SUBJECT TERMS 15. NUMBER OF PAGES TQM (Total Quality Management ), Office of General...89) Pra-ifcr~bed ANSI Sid 139-1S ""-"’- ", ~ mmmmmu10n S S OFFICE OF GENERAL COUNSEL TOTAL QUALITY MANAGEMENT PLAN Acc’, ’ 7or. .?:" t ’_7 Codes K 89

  8. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of the...

  9. 75 FR 65594 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ... Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards AGENCY... the Ohio Administrative Code (OAC) relating to the consolidation of Ohio's Ambient Air Quality Standards (AAQS) into Ohio's State Implementation Plan (SIP) under the Clean Air Act. On April 8, 2009, and...

  10. 77 FR 12524 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality Standards AGENCY... Indiana State Implementation Plan (SIP) for lead (Pb) under the Clean Air Act (CAA). This submittal incorporates the National Ambient Air Quality Standards (NAAQS) for Pb promulgated by EPA in 2008. DATES...

  11. SU-D-BRB-02: Combining a Commercial Autoplanning Engine with Database Dose Predictions to Further Improve Plan Quality

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robertson, SP; Moore, JA; Hui, X

    Purpose: Database dose predictions and a commercial autoplanning engine both improve treatment plan quality in different but complimentary ways. The combination of these planning techniques is hypothesized to further improve plan quality. Methods: Four treatment plans were generated for each of 10 head and neck (HN) and 10 prostate cancer patients, including Plan-A: traditional IMRT optimization using clinically relevant default objectives; Plan-B: traditional IMRT optimization using database dose predictions; Plan-C: autoplanning using default objectives; and Plan-D: autoplanning using database dose predictions. One optimization was used for each planning method. Dose distributions were normalized to 95% of the planning target volumemore » (prostate: 8000 cGy; HN: 7000 cGy). Objectives used in plan optimization and analysis were the larynx (25%, 50%, 90%), left and right parotid glands (50%, 85%), spinal cord (0%, 50%), rectum and bladder (0%, 20%, 50%, 80%), and left and right femoral heads (0%, 70%). Results: All objectives except larynx 25% and 50% resulted in statistically significant differences between plans (Friedman’s χ{sup 2} ≥ 11.2; p ≤ 0.011). Maximum dose to the rectum (Plans A-D: 8328, 8395, 8489, 8537 cGy) and bladder (Plans A-D: 8403, 8448, 8527, 8569 cGy) were significantly increased. All other significant differences reflected a decrease in dose. Plans B-D were significantly different from Plan-A for 3, 17, and 19 objectives, respectively. Plans C-D were also significantly different from Plan-B for 8 and 13 objectives, respectively. In one case (cord 50%), Plan-D provided significantly lower dose than plan C (p = 0.003). Conclusion: Combining database dose predictions with a commercial autoplanning engine resulted in significant plan quality differences for the greatest number of objectives. This translated to plan quality improvements in most cases, although special care may be needed for maximum dose constraints. Further evaluation is

  12. Quality-assurance plan for water-quality activities in the North Florida Program Office, Florida District

    USGS Publications Warehouse

    Berndt, Marian P.; Katz, Brian G.

    2000-01-01

    In accordance with guidelines set forth by the Office of Water Quality in the Water Resources Division of the U.S. Geological Survey, a quality-assurance plan was created for use by the Florida District's North Florida Program Office in conducting water-quality activities. This plan documents the standards, policies, and procedures used by the North Florida Program Office for activities related to the collection, processing, storage, analysis, and publication of water-quality data.

  13. A Total Quality-Control Plan with Right-Sized Statistical Quality-Control.

    PubMed

    Westgard, James O

    2017-03-01

    A new Clinical Laboratory Improvement Amendments option for risk-based quality-control (QC) plans became effective in January, 2016. Called an Individualized QC Plan, this option requires the laboratory to perform a risk assessment, develop a QC plan, and implement a QC program to monitor ongoing performance of the QC plan. Difficulties in performing a risk assessment may limit validity of an Individualized QC Plan. A better alternative is to develop a Total QC Plan including a right-sized statistical QC procedure to detect medically important errors. Westgard Sigma Rules provides a simple way to select the right control rules and the right number of control measurements. Copyright © 2016 Elsevier Inc. All rights reserved.

  14. Approved Air Quality Implementation Plans in The Virgin Islands

    EPA Pesticide Factsheets

    This site contains information about air quality regulations called State Implementation Plans (SIPs), Federal Implementation Plans (FIPs), and Tribal Implementation Plans (TIPs) approved by EPA within the U.S. Virgin Islands.

  15. Texas Quality Workforce Planning: 1993 Key Industries and Targeted Occupations for Texas' 24 Quality Work Force Planning Regions.

    ERIC Educational Resources Information Center

    Texas State Dept. of Commerce, Austin.

    In 1993, Texas' 24 quality work force planning committees used a state-developed targeted occupations planning methodology to identify key industries and targeted occupations with the greatest potential for job openings in their respective regions. Between 11 and 20 key industries (13.5 on average) were identified for each region. The following 10…

  16. Reliability and utility of the Behaviour Support Plan Quality Evaluation tool (BSP-QEII) for auditing and quality development in services for adults with intellectual disability and challenging behaviour.

    PubMed

    McVilly, K; Webber, L; Paris, M; Sharp, G

    2013-08-01

    Having an objective means of evaluating the quality of behaviour support plans (BSPs) could assist service providers and statutory authorities to monitor and improve the quality of support provided to people with intellectual disability (ID) who exhibit challenging behaviour. The Behaviour Support Plan Quality Evaluation Guide II (BSP-QEII) was developed to monitor and assess BSPs prepared by teachers to support children with disability in the school system. This study investigated the application of the BSP-QEII to the assessment of BSPs for adults with ID in community support services. The inter-rater reliability of the BSP-QEII was assessed. The utility of the BPS-QEII was then investigated with reference to a time series study of matched pairs of BSPs, developed for the same clients over a period of approximately 3 years. Differences in plan quality measured across a number of service and systemic variables were also investigated. The BSP-QEII was found to have good inter-rater reliability and good utility for audit purposes. It was able to discriminate changes in plan quality over time. Differences in plan quality were also evident across different service types, where specialist staff had or had not been involved, and in some instances where a statutory format for the plan had or had not been used. There were no differences between plans developed by government and community sector agencies, nor were there any regional differences across the jurisdiction. The BSP-QEII could usefully be adopted as an audit tool for measuring the quality of BSPs for adults with ID. In addition to being used for research and administrative auditing, the principles underpinning the BSP-QEII could also be useful to guide policy and educational activities for staff in community based services for adults with ID. © 2012 The Authors. Journal of Intellectual Disability Research © 2012 John Wiley & Sons Ltd, MENCAP & IASSID.

  17. Dependence of Achievable Plan Quality on Treatment Technique and Planning Goal Refinement: A Head-and-Neck Intensity Modulated Radiation Therapy Application

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Qi, X. Sharon, E-mail: xqi@mednet.ucla.edu; Ruan, Dan; Lee, Steve P.

    2015-03-15

    Purpose: To develop a practical workflow for retrospectively analyzing target and normal tissue dose–volume endpoints for various intensity modulated radiation therapy (IMRT) delivery techniques; to develop technique-specific planning goals to improve plan consistency and quality when feasible. Methods and Materials: A total of 165 consecutive head-and-neck patients from our patient registry were selected and retrospectively analyzed. All IMRT plans were generated using the same dose–volume guidelines for TomoTherapy (Tomo, Accuray), TrueBeam (TB, Varian) using fixed-field IMRT (TB-IMRT) or RAPIDARC (TB-RAPIDARC), or Siemens Oncor (Siemens-IMRT, Siemens). A MATLAB-based dose–volume extraction and analysis tool was developed to export dosimetric endpoints for eachmore » patient. With a fair stratification of patient cohort, the variation of achieved dosimetric endpoints was analyzed among different treatment techniques. Upon identification of statistically significant variations, technique-specific planning goals were derived from dynamically accumulated institutional data. Results: Retrospective analysis showed that although all techniques yielded comparable target coverage, the doses to the critical structures differed. The maximum cord doses were 34.1 ± 2.6, 42.7 ± 2.1, 43.3 ± 2.0, and 45.1 ± 1.6 Gy for Tomo, TB-IMRT, TB-RAPIDARC, and Siemens-IMRT plans, respectively. Analyses of variance showed significant differences for the maximum cord doses but no significant differences for other selected structures among the investigated IMRT delivery techniques. Subsequently, a refined technique-specific dose–volume guideline for maximum cord dose was derived at a confidence level of 95%. The dosimetric plans that failed the refined technique-specific planning goals were reoptimized according to the refined constraints. We observed better cord sparing with minimal variations for the target coverage and other organ at risk sparing for the Tomo cases, and

  18. Quality Assurance Project Plan for Citizen Science Projects

    EPA Pesticide Factsheets

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  19. 78 FR 53270 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District... to the Sacramento Metropolitan Air Quality Management District (SMAQMD or District) portion of the..., Sacramento Metropolitan Air Quality Management District, Rule 214 (Federal New Source Review), Rule 203...

  20. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality... proposed quality control plan which shall be designed to assure the quality of respiratory protection...

  1. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality... proposed quality control plan which shall be designed to assure the quality of respiratory protection...

  2. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality... proposed quality control plan which shall be designed to assure the quality of respiratory protection...

  3. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality... proposed quality control plan which shall be designed to assure the quality of respiratory protection...

  4. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality... proposed quality control plan which shall be designed to assure the quality of respiratory protection...

  5. Air Pollution Monitoring | Air Quality Planning & Standards ...

    EPA Pesticide Factsheets

    2016-06-08

    The basic mission of the Office of Air Quality Planning and Standards is to preserve and improve the quality of our nation's air. To accomplish this, OAQPS must be able to evaluate the status of the atmosphere as compared to clean air standards and historical information.

  6. 10 CFR 905.1 - What are the purposes of the Energy Planning and Management Program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Resource Planning, allows customers of the Western Area Power Administration (Western) to meet the objectives of section 114 of EPAct through integrated resource planning or by other means, such as attaining... purposes of the Energy Planning and Management Program (EPAMP) are to meet the objectives of Section 114 of...

  7. A semi-automated tool for treatment plan-quality evaluation and clinical trial quality assurance

    NASA Astrophysics Data System (ADS)

    Wang, Jiazhou; Chen, Wenzhou; Studenski, Matthew; Cui, Yunfeng; Lee, Andrew J.; Xiao, Ying

    2013-07-01

    The goal of this work is to develop a plan-quality evaluation program for clinical routine and multi-institutional clinical trials so that the overall evaluation efficiency is improved. In multi-institutional clinical trials evaluating the plan quality is a time-consuming and labor-intensive process. In this note, we present a semi-automated plan-quality evaluation program which combines MIMVista, Java/MATLAB, and extensible markup language (XML). More specifically, MIMVista is used for data visualization; Java and its powerful function library are implemented for calculating dosimetry parameters; and to improve the clarity of the index definitions, XML is applied. The accuracy and the efficiency of the program were evaluated by comparing the results of the program with the manually recorded results in two RTOG trials. A slight difference of about 0.2% in volume or 0.6 Gy in dose between the semi-automated program and manual recording was observed. According to the criteria of indices, there are minimal differences between the two methods. The evaluation time is reduced from 10-20 min to 2 min by applying the semi-automated plan-quality evaluation program.

  8. Quality Assurance Project Plan Development Tool

    EPA Pesticide Factsheets

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  9. DLA-X Total Quality Management (TQM) Implementation Plan

    DTIC Science & Technology

    1989-07-01

    PAGES TOM (Total Quality Management ), Continuous Process Improvement.( .) 4L-- Administration 16. PRICE CODE 17. SECURITY CLASSIFICATION 18. SECURITY...NSN 7540-01-280-5500 Standard Form 298 (Rev. 2-89) Pr.-cr,bed by ANSI Std ,,fl.f 296-102 DLA-X TOTAL QUALITY MANAGEMENT (TQM) IMPLEMENTATION PLAN o...application of proven Total Quality Management techniques. Quality Policy: Responsibility for quality is delegated to every employee ;11 DLA-X. Every

  10. SU-E-T-617: Plan Quality Estimation of Intensity-Modulated Radiotherapy Cases for Lung Cancer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Koo, J; Yoon, M; Chung, W

    Purpose: To estimate the planning quality of intensity-modulated radiotherapy in lung cancer cases and to provide preliminary data for the development of a planning quality assurance algorithm. Methods: 42 IMRT plans previously used in cases of solitary lung cancers were collected. Organs in or near the thoracic cavity, such as lung (ipsilateral, contralateral), heart, liver, esophagus, cord and bronchus were considered as organs at risk (OARs) in this study. The coverage index (CVI), conformity index (CI), homogeneity index (HI), volume, irregularity (standard deviation of center-surface distance) were used to compare PTV dose characteristics. The effective uniform dose (EUD), V10Gy, andmore » V20Gy of the OARs were used to compare OAR dose characteristics. Results: Average CVI, CI, HI values were 0.9, 0.8, 0.1, respectively. CVI and CI had narrow Gaussian distribution curves without a singular value, but one case had a relatively high (0.25) HI because of location and irregular shape (Irregularity of 18.5 when average was 12.5) of PTV. EUDs tended to decrease as OAR-PTV distance increased and OAR-PTV overlap volume decreased. Conclusion: This work indicates the potential for significant plan quality deviation of similar lung cancer cases. Considering that this study were from a single department, differences in the treatment results for a given patient would be much more pronounced if multiple departments (and therefore more planners) were involved. Therefore, further examination of QA protocols is needed to reduce deviations in radiation treatment planning.« less

  11. Process quality planning of quality function deployment for carrot syrup

    NASA Astrophysics Data System (ADS)

    Ekawati, Yurida; Noya, Sunday; Widjaja, Filemon

    2017-06-01

    Carrot products are rarely available in the market. Based on previous research that had been done using QFD to generate product design of carrots products, the research to produce the process quality planning had been carried out. The carrot product studied was carrot syrup. The research resulted in a process planning matrix for carrot syrup. The matrix gives information about critical process plan and the priority of the critical process plan. The critical process plan on the production process of carrot syrup consists of carrots sorting, carrots peeling, carrots washing, blanching process, carrots cutting, the making of pureed carrots, filtering carrot juice, the addition of sugar in carrot juice, the addition of food additives in carrot juice, syrup boiling, syrup filtering, syrup filling into the bottle, the bottle closure and cooling. The information will help the design of the production process of carrot syrup.

  12. Air Quality Planning Unit | Ground-level Ozone | New England ...

    EPA Pesticide Factsheets

    2017-09-05

    Looking for answers about a specific air quality issue? Here's a list of topics and programs related to air quality and Air Quality Planning (AQP) staff who can answer questions and provide information about them.

  13. Air Quality Planning Unit | Ground-level Ozone | New England ...

    EPA Pesticide Factsheets

    2017-04-10

    Looking for answers about a specific air quality issue? Here's a list of topics and programs related to air quality and Air Quality Planning (AQP) staff who can answer questions and provide information about them.

  14. Evaluation of MLC leaf transmission on IMRT treatment plan quality of patients with advanced lung cancer.

    PubMed

    Chen, Jiayun; Fu, Guishan; Li, Minghui; Song, Yixin; Dai, Jianrong; Miao, Junjie; Liu, Zhiqiang; Li, Yexiong

    2017-12-14

    The purpose of this paper was to evaluate the impact of leaf treatment of multileaf collimator (MLC) in plan quality of intensity-modulated radiotherapy (IMRT) of patients with advanced lung cancer. Five MLCs with different leaf transmissions (0.01%, 0.5%, 1.2%, 1.8%, and 3%) were configured for an accelerator in a treatment planning system. Correspondingly, 5 treatment plans with the same optimization setting were created and evaluated quantitatively for each patient (11 patients total) who was diagnosed with advanced lung cancer. All of the 5 plans for each patient met the dose requirement for the planning treatment volumes (PTVs) and had similar target dose homogeneity and conformity. On average, the doses to selected organs were as follows: (1) V 5 , V 20 , and the mean dose of total lung; (2) the maximum and mean dose to spinal cord planning organ-at-risk volume (PRV); and (3) V 30 and V 40 of heart, decreased slightly when MLC transmission was decreased, but with no statistical differences. There is a clear grouping of plans having total quality score (S D ) value, which is used to evaluate plan quality: (1) more than 1 (patient nos. 1 to 3, 5, and 8), and more than 2.5 (patient no. 6); (2) less than 1 (patient nos. 7 and 10); (3) around 1 (patient nos. 4, 9, and 11). As MLC transmission increased, overall S D values increased as well and plan dose requirement was harder to meet. The clinical requirements were violated increasingly as MLC transmission became large. Total S D with and without normal tissue (NT) showed similar results, with no statistically significant differences. Therefore, decrease of MLC transmission did have minimum impact on plan, and it improved target coverage and reduced normal tissue radiation slightly, with no statistical significance. Plan quality could not be significantly improved by MLC transmission reduction. However, lower MLC transmission may have advantages on lung sparing to low- and intermediate-dose exposure. Besides

  15. 25 CFR 170.410 - What is the purpose of tribal long-range transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the purpose of tribal long-range transportation planning? 170.410 Section 170.410 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads...

  16. Total Quality Management Implementation Plan: Defense Depot, Ogden

    DTIC Science & Technology

    1989-07-01

    NUMBERS Total Quality Management Implementation Plan Defense Depot Ogden 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING...PAGES TQM (Total Quality Management ), Continuous Process Improvement, Depot Operations, Process Action Teams 16. PRICE CODE 17. SECURITY...034 A Message From The Commander On Total Quality Management i fully support the DLA aoproacii to Total Quality Management . As stated by General

  17. Internal quality control: planning and implementation strategies.

    PubMed

    Westgard, James O

    2003-11-01

    The first essential in setting up internal quality control (IQC) of a test procedure in the clinical laboratory is to select the proper IQC procedure to implement, i.e. choosing the statistical criteria or control rules, and the number of control measurements, according to the quality required for the test and the observed performance of the method. Then the right IQC procedure must be properly implemented. This review focuses on strategies for planning and implementing IQC procedures in order to improve the quality of the IQC. A quantitative planning process is described that can be implemented with graphical tools such as power function or critical-error graphs and charts of operating specifications. Finally, a total QC strategy is formulated to minimize cost and maximize quality. A general strategy for IQC implementation is recommended that employs a three-stage design in which the first stage provides high error detection, the second stage low false rejection and the third stage prescribes the length of the analytical run, making use of an algorithm involving the average of normal patients' data.

  18. Evaluating which plan quality metrics are appropriate for use in lung SBRT.

    PubMed

    Yaparpalvi, Ravindra; Garg, Madhur K; Shen, Jin; Bodner, William R; Mynampati, Dinesh K; Gafar, Aleiya; Kuo, Hsiang-Chi; Basavatia, Amar K; Ohri, Nitin; Hong, Linda X; Kalnicki, Shalom; Tome, Wolfgang A

    2018-02-01

    Several dose metrics in the categories-homogeneity, coverage, conformity and gradient have been proposed in literature for evaluating treatment plan quality. In this study, we applied these metrics to characterize and identify the plan quality metrics that would merit plan quality assessment in lung stereotactic body radiation therapy (SBRT) dose distributions. Treatment plans of 90 lung SBRT patients, comprising 91 targets, treated in our institution were retrospectively reviewed. Dose calculations were performed using anisotropic analytical algorithm (AAA) with heterogeneity correction. A literature review on published plan quality metrics in the categories-coverage, homogeneity, conformity and gradient was performed. For each patient, using dose-volume histogram data, plan quality metric values were quantified and analysed. For the study, the radiation therapy oncology group (RTOG) defined plan quality metrics were: coverage (0.90 ± 0.08); homogeneity (1.27 ± 0.07); conformity (1.03 ± 0.07) and gradient (4.40 ± 0.80). Geometric conformity strongly correlated with conformity index (p < 0.0001). Gradient measures strongly correlated with target volume (p < 0.0001). The RTOG lung SBRT protocol advocated conformity guidelines for prescribed dose in all categories were met in ≥94% of cases. The proportion of total lung volume receiving doses of 20 Gy and 5 Gy (V 20 and V 5 ) were mean 4.8% (±3.2) and 16.4% (±9.2), respectively. Based on our study analyses, we recommend the following metrics as appropriate surrogates for establishing SBRT lung plan quality guidelines-coverage % (ICRU 62), conformity (CN or CI Paddick ) and gradient (R 50% ). Furthermore, we strongly recommend that RTOG lung SBRT protocols adopt either CN or CI Padddick in place of prescription isodose to target volume ratio for conformity index evaluation. Advances in knowledge: Our study metrics are valuable tools for establishing lung SBRT plan quality guidelines.

  19. Total Quality Management Implementation Plan: DLA-N

    DTIC Science & Technology

    1989-07-01

    e Wastimto , n. Othe 20 Seato3 4. TITLE AND SUBTITLE S. FUNDING NUMBERS DLA-N Total Quality Management 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S...PAGES TQM (Total Quality Management ), Continuous Process Improvement.(; , Defense National Stockpile 16. PRICE CODEI17. SECURITY CLASSIFICATION 18...IUNCLASSIFIED UL NSN 7540-01-280-5500 Standard Form 298 (Rev. 2-89) pr"!Cbed ty ANSI Std Z39’B6 296-102 DLA - N TOTAL QUALITY MANAGEMENT IMPLEMENTATION PLAN I

  20. Quality Management Plan for the Environmental Assessment and Innovation Division

    EPA Pesticide Factsheets

    Quality management plan (QMP) which identifies the mission, roles, responsibilities of personnel with regard to quality assurance and quality management for the environmental assessment and innovation division.

  1. QUALITY MANAGEMENT PLAN FOR THE NATIONAL CHILDREN'S STUDY

    EPA Science Inventory

    EPA has taken the lead, in consort with NIH, in developing the Quality Management Plan (QMP) for the National Children's Study (NCS); the QMP will delineate a systematic planning process for the implementation of the NCS. The QMP will state the goals and objectives of the NCS, th...

  2. Achieving performance breakthroughs in an HMO business process through quality planning.

    PubMed

    Hanan, K B

    1993-01-01

    Kaiser Permanente's Georgia Region commissioned a quality planning team to design a new process to improve payments to its suppliers and vendors. The result of the team's effort was a 73 percent reduction in cycle time. This team's experiences point to the advantages of process redesign as a quality planning model, as well as some general guidelines for its most effective use in teams. If quality planning project teams are carefully configured, sufficiently expert in the existing process, and properly supported by management, organizations can achieve potentially dramatic improvements in process performance using this approach.

  3. DATA QUALITY OBJECTIVES IN RESEARCH PLANNING AT MED: THREE CASE STUDIES

    EPA Science Inventory

    This course will give a quality assurance perspective to research planning by describing the Data Quality Objective Process....Written plans are mandatory for all EPA environmental data collection activities according to EPA Order 5360.1 CHG 1 and Federal Acquisition Regulations,...

  4. Standard Review Plan for Environmental Restoration Program Quality Management Plans. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts asmore » a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements.« less

  5. Design and realization of high quality prime farmland planning and management information system

    NASA Astrophysics Data System (ADS)

    Li, Manchun; Liu, Guohong; Liu, Yongxue; Jiang, Zhixin

    2007-06-01

    The article discusses the design and realization of a high quality prime farmland planning and management information system based on SDSS. Models in concept integration, management planning are used in High Quality Prime Farmland Planning in order to refine the current model system and the management information system is deigned with a triangular structure. Finally an example of Tonglu county high quality prime farmland planning and management information system is introduced.

  6. EPA Guidance for Geospatially Related Quality Assurance Project Plans

    EPA Pesticide Factsheets

    This March 2003 document discusses EPA's Quality Assurance (QA) Project Plan as a tool for project managers and planners to document the type and quality of data and information needed for making environmental decisions

  7. 75 FR 76332 - Approval and Promulgation of Air Quality Implementation Plans; Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-08

    ... Promulgation of Air Quality Implementation Plans; Illinois AGENCY: Environmental Protection Agency (EPA... attaining the 1997 8-hour ozone National Ambient Air Quality Standard (NAAQS). The State's NO X RACT waiver... classification of an area. The air quality planning and control requirements for the reduction of NO X emissions...

  8. 30 CFR 28.31 - Quality control plans; contents.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28.31 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.31 Quality control plans; contents. (a... Specification MIL-F-15160D is available for examination at the U.S. Department of Labor, Mine Safety and Health...

  9. 30 CFR 28.31 - Quality control plans; contents.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28.31 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.31 Quality control plans; contents. (a... Specification MIL-F-15160D is available for examination at the U.S. Department of Labor, Mine Safety and Health...

  10. 30 CFR 28.31 - Quality control plans; contents.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28.31 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.31 Quality control plans; contents. (a... Specification MIL-F-15160D is available for examination at the U.S. Department of Labor, Mine Safety and Health...

  11. 30 CFR 28.31 - Quality control plans; contents.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28.31 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.31 Quality control plans; contents. (a... Specification MIL-F-15160D is available for examination at the U.S. Department of Labor, Mine Safety and Health...

  12. Evaluation of service quality in family planning clinics in Lusaka, Zambia.

    PubMed

    Hancock, Nancy L; Vwalika, Bellington; Sitali, Elizabeth Siyama; Mbwili-Muleya, Clara; Chi, Benjamin H; Stuart, Gretchen S

    2015-10-01

    To determine the quality of contraceptive services in family planning clinics in Lusaka, Zambia, using a standardized approach. We utilized the Quick Investigation of Quality, a cross-sectional survey tool consisting of a facility assessment, client-provider observation and client exit interview, in public-sector family planning clinics. Data were collected on availability of seven contraceptive methods, information given to clients, interpersonal relations between providers and clients, providers' technical competence and mechanisms for continuity and follow-up. Data were collected from five client-provider observations and client exit interviews in each of six public-sector family planning clinics. All clinics had at least two contraceptive methods continuously available for the preceding 6 months. Most providers asked clients about concerns with their contraceptive method (80%) and told clients when to return to the clinic (87%). Most clients reported that the provider advised what to do if a problem develops (93%), described possible side effects (89%), explained how to use the method effectively (85%) and told them when to come for follow-up (83%). Clients were satisfied with services received (93%). This application of the Quick Investigation of Quality showed that the participating family planning clinics in Lusaka, Zambia, were prepared to offer high-quality services with the available commodities and that clients were satisfied with the received services. Despite the subjective client satisfaction, quality improvement efforts are needed to increase contraceptive availability. Although clients perceived the quality of care received to be high, family planning service quality could be improved to continuously offer the full spectrum of contraceptive options. The Quick Investigation of Quality was easily implemented in Lusaka, Zambia, and this simple approach could be utilized in a variety of settings as a modality for quality improvement. Copyright © 2015

  13. KCBX Quality Assurance Project Plan - February 2014

    EPA Pesticide Factsheets

    This plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring, by URS Corporation, at the KCBX Terminals Company North and South Terminals in Chicago, IL.

  14. SU-E-T-370: Evaluating Plan Quality and Dose Delivery Accuracy of Tomotherapy SBRT Treatments for Lung Cancer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blake, S; Thwaites, D; Hansen, C

    2015-06-15

    Purpose: This study evaluated the plan quality and dose delivery accuracy of stereotactic body radiotherapy (SBRT) helical Tomotherapy (HT) treatments for lung cancer. Results were compared with those previously reported by our group for flattening filter (FF) and flattening filter free (FFF) VMAT treatments. This work forms part of an ongoing multicentre and multisystem planning and dosimetry audit on FFF beams for lung SBRT. Methods: CT datasets and DICOM RT structures delineating the target volume and organs at risk for 6 lung cancer patients were selected. Treatment plans were generated using the HT treatment planning system. Tumour locations were classifiedmore » as near rib, near bronchial tree or in free lung with prescribed doses of 48Gy/4fr, 50Gy/5fr and 54Gy/3fr respectively. Dose constraints were specified by a modified RTOG0915 protocol used for an Australian SBRT phase II trial. Plan quality was evaluated using mean PTV dose, PTV volume receiving 100% of the prescribed dose (V100%), target conformity (CI=VD100%/VPTV) and low dose spillage (LDS=VD50%/VPTV). Planned dose distributions were compared to those measured using an ArcCheck phantom. Delivery accuracy was evaluated using a gamma-index pass rate of 95% with 3% (of max dose) and 3mm criteria. Results: Treatment plans for all patients were clinically acceptable in terms of quality and accuracy of dose delivery. The following DVH metrics are reported as averages (SD) of all plans investigated: mean PTV dose was 115.3(2.4)% of prescription, V100% was 98.8(0.9)%, CI was 1.14(0.03) and LDS was 5.02(0.37). The plans had an average gamma-index passing rate of 99.3(1.3)%. Conclusion: The results reported in this study for HT agree within 1 SD to those previously published by our group for VMAT FF and FFF lung SBRT treatments. This suggests that HT delivers lung SBRT treatments of comparable quality and delivery accuracy as VMAT using both FF and FFF beams.« less

  15. Quality assessment for VMAT prostate radiotherapy planning based on data envelopment analysis

    NASA Astrophysics Data System (ADS)

    Lin, Kuan-Min; Simpson, John; Sasso, Giuseppe; Raith, Andrea; Ehrgott, Matthias

    2013-08-01

    The majority of commercial radiotherapy treatment planning systems requires planners to iteratively adjust the plan parameters in order to find a satisfactory plan. This iterative trial-and-error nature of radiotherapy treatment planning results in an inefficient planning process and in order to reduce such inefficiency, plans can be accepted without achieving the best attainable quality. We propose a quality assessment method based on data envelopment analysis (DEA) to address this inefficiency. This method compares a plan of interest to a set of past delivered plans and searches for evidence of potential further improvement. With the assistance of DEA, planners will be able to make informed decisions on whether further planning is required and ensure that a plan is only accepted when the plan quality is close to the best attainable one. We apply the DEA method to 37 prostate plans using two assessment parameters: rectal generalized equivalent uniform dose (gEUD) as the input and D95 (the minimum dose that is received by 95% volume of a structure) of the planning target volume (PTV) as the output. The percentage volume of rectum overlapping PTV is used to account for anatomical variations between patients and is included in the model as a non-discretionary output variable. Five plans that are considered of lesser quality by DEA are re-optimized with the goal to further improve rectal sparing. After re-optimization, all five plans improve in rectal gEUD without clinically considerable deterioration of the PTV D95 value. For the five re-optimized plans, the rectal gEUD is reduced by an average of 1.84 Gray (Gy) with only an average reduction of 0.07 Gy in PTV D95. The results demonstrate that DEA can correctly identify plans with potential improvements in terms of the chosen input and outputs.

  16. Determinants of Quality of Family Planning Counseling among Private Health Facilities in Lagos.

    PubMed

    Johnson, Doug; Ugaz, Jorge

    2016-09-01

    We use a unique dataset that includes an objective measure of the quality of family planning counseling from 927 private health facilities in Lagos State, Nigeria, to determine which variables at the facility and provider levels are most closely correlated with the quality of family planning counseling. Our data on quality come from mystery client surveys in which the clients posed as women seeking family planning counseling. We find that quality is strongly associated with the cadre of provider, with doctors delivering substantially higher-quality counselling than nurses. Doctors not only outperform nurses overall, but also perform better on each category of quality and spend nearly three minutes longer on average counseling the mystery client. Location, fees charged for the service, and facility type are also strongly correlated with quality. The degree to which a facility specializes in family planning and facility size are only weakly predictive of quality. © 2016 The Population Council, Inc.

  17. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management plans and... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with...

  18. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management plans and... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with...

  19. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management plans and... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with...

  20. KCBX Quality Assurance Project Plan - October 2014

    EPA Pesticide Factsheets

    This revised plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring by URS Corporation at the KCBX Terminals Company North and South Terminals in Chicago, Ill.

  1. 75 FR 65572 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ... Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards AGENCY... Ohio Administrative Code (OAC) relating to the consolidation of Ohio's Ambient Air Quality Standards... apply to Ohio's SIP. Incorporating the air quality standards into Ohio's SIP helps assure that...

  2. Risk-based water resources planning: Coupling water allocation and water quality management under extreme droughts

    NASA Astrophysics Data System (ADS)

    Mortazavi-Naeini, M.; Bussi, G.; Hall, J. W.; Whitehead, P. G.

    2016-12-01

    The main aim of water companies is to have a reliable and safe water supply system. To fulfil their duty the water companies have to consider both water quality and quantity issues and challenges. Climate change and population growth will have an impact on water resources both in terms of available water and river water quality. Traditionally, a distinct separation between water quality and abstraction has existed. However, water quality can be a bottleneck in a system since water treatment works can only treat water if it meets certain standards. For instance, high turbidity and large phytoplankton content can increase sharply the cost of treatment or even make river water unfit for human consumption purposes. It is vital for water companies to be able to characterise the quantity and quality of water under extreme weather events and to consider the occurrence of eventual periods when water abstraction has to cease due to water quality constraints. This will give them opportunity to decide on water resource planning and potential changes to reduce the system failure risk. We present a risk-based approach for incorporating extreme events, based on future climate change scenarios from a large ensemble of climate model realisations, into integrated water resources model through combined use of water allocation (WATHNET) and water quality (INCA) models. The annual frequency of imposed restrictions on demand is considered as measure of reliability. We tested our approach on Thames region, in the UK, with 100 extreme events. The results show increase in frequency of imposed restrictions when water quality constraints were considered. This indicates importance of considering water quality issues in drought management plans.

  3. National Ignition Facility quality assurance program plan revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wolfe, C R

    1998-06-01

    NIF Project activities will be conducted in a manner consistent with the guidance and direction of the DOE Order on Quality Assurance (414.1), the LLNL QA Program, and the Laser Directorate QA Plan. Quality assurance criteria will be applied in a graded manner to achieve a balance between the rigor of application of QA measures and the scale, cost, and complexity of the work involved. Accountability for quality is everyone's, extending from the Project Manager through established lines of authority to all Project personnel, who are responsible for the requisite quality of their own work. The NLF QA Program willmore » be implemented by personnel conducting their activities to meet requirements and expectations, according to established plans and procedures that reflect the way business is to be conducted on the Project.« less

  4. Managed care quality of care and plan choice in New York SCHIP.

    PubMed

    Liu, Hangsheng; Phelps, Charles E; Veazie, Peter J; Dick, Andrew W; Klein, Jonathan D; Shone, Laura P; Noyes, Katia; Szilagyi, Peter G

    2009-06-01

    To examine whether low-income parents of children enrolled in the New York State Children's Health Insurance Program (SCHIP) choose managed care plans with better quality of care. 2001 New York SCHIP evaluation data; 2001 New York State Managed Care Plan Performance Report; 2000 New York State Managed Care Enrollment Report. Each market was defined as a county. A final sample of 2,325 new enrollees was analyzed after excluding those in markets with only one SCHIP plan. Plan quality was measured using seven Consumer Assessment of Health Plans Survey (CAHPS) and three Health Plan Employer Data and Information Set (HEDIS) scores. A conditional logit model was applied with plan and individual/family characteristics as covariates. There were 30 plans in the 45 defined markets. The choice probability increased 2.5 percentage points for each unit increase in the average CAHPS score, and the association was significantly larger in children with special health care needs. However, HEDIS did not show any statistically significant association with plan choice. Low-income parents do choose managed care plans with higher CAHPS scores for their newly enrolled children, suggesting that overall quality could improve over time because of the dynamics of enrollment.

  5. 77 FR 35285 - Approval of Air Quality Implementation Plan; Arizona; Attainment Plan for 1997 8-Hour Ozone Standard

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-13

    ... Quality Implementation Plan; Arizona; Attainment Plan for 1997 8-Hour Ozone Standard AGENCY: U.S... 1997 8-hour ozone national ambient air quality standards (NAAQS) in the Phoenix-Mesa nonattainment area... required for ozone nonattainment areas under title I, part D, subpart 1 of the Clean Air Act (CAA) for the...

  6. SU-E-T-173: Clinical Comparison of Treatment Plans and Fallback Plans for Machine Downtime

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cruz, W; Cancer Therapy and Research Center, San Antonio, TX; Papanikolaou, P

    2015-06-15

    Purpose: The purpose of this study was to determine the clinical effectiveness and dosimetric quality of fallback planning in relation to machine downtime. Methods: Plans for a Varian Novalis TX were mimicked, and fallback plans using an Elekta VersaHD machine were generated using a dual arc template. Plans for thirty (n=30) patients of various treatment sites optimized and calculated using RayStation treatment planning system. For each plan, a fall back plan was created and compared to the original plan. A dosimetric evaluation was conducted using the homogeneity index, conformity index, as well as DVH analysis to determine the quality ofmore » the fallback plan on a different treatment machine. Fallback plans were optimized for 60 iterations using the imported dose constraints from the original plan DVH to give fallback plans enough opportunity to achieve the dose objectives. Results: The average conformity index and homogeneity index for the NovalisTX plans were 0.76 and 10.3, respectively, while fallback plan values were 0.73 and 11.4. (Homogeneity =1 and conformity=0 for ideal plan) The values to various organs at risk were lower in the fallback plans as compared to the imported plans across most organs at risk. Isodose difference comparisons between plans were also compared and the average dose difference across all plans was 0.12%. Conclusion: The clinical impact of fallback planning is an important aspect to effective treatment of patients. With the complexity of LINACS increasing every year, an option to continue treating during machine downtime remains an essential tool in streamlined treatment execution. Fallback planning allows the clinic to continue to run efficiently should a treatment machine become offline due to maintenance or repair without degrading the quality of the plan all while reducing strain on members of the radiation oncology team.« less

  7. 78 FR 49409 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-14

    ...] Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure Requirements for the 2010 Nitrogen Dioxide National Ambient Air Quality Standards AGENCY: Environmental Protection... national ambient air quality standards (NAAQS) are promulgated, the CAA requires states to submit a plan...

  8. Guidance for Quality Assurance Project Plans, EPA QA/G-5

    EPA Pesticide Factsheets

    provides guidance to EPA employees and other organizations involved in developing Quality Assurance (QA) Project Plans that address the specifications listed in EPA Requirements for QA Project Plans (QA/R-5)

  9. 78 FR 63934 - Approval of Air Quality Implementation Plans; California; El Dorado County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ...] Approval of Air Quality Implementation Plans; California; El Dorado County Air Quality Management District... California for the El Dorado County Air Quality Management District (EDAQMD) portion of the California SIP... 24, 1987 Federal Register, May 25, 1988, U.S. EPA, Air Quality Management Division, Office of Air...

  10. 78 FR 19990 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-03

    ... Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards; Correction AGENCY... approved revisions to Ohio regulations that consolidated air quality standards in a new chapter of rules... State's air quality standards into Ohio Administrative Code (OAC) 3745-25 and modifying an assortment of...

  11. 77 FR 12482 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality Standards AGENCY... incorporates the National Ambient Air Quality Standards (NAAQS) for Pb promulgated by EPA in 2008. DATES: This... FR 66964) and codified at 40 CFR 50.16, ``National primary and secondary ambient air quality...

  12. 78 FR 53709 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-30

    ...] Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure Requirements for the 2008 Ozone National Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA... ambient air quality standards (NAAQS) are promulgated, the CAA requires states to submit a plan for the...

  13. 76 FR 34590 - Bankruptcy Filing Date Treated as Plan Termination Date for Certain Purposes; Guaranteed Benefits...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4001, 4022, and 4044 RIN 1212-AA98 Bankruptcy Filing Date Treated as Plan Termination Date for Certain Purposes; Guaranteed Benefits; Allocation of Plan Assets; Pension Protection Act of 2006 AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final...

  14. Software quality assurance plan for GCS

    NASA Technical Reports Server (NTRS)

    Duncan, Stephen E.; Bailey, Elizabeth K.

    1990-01-01

    The software quality assurance (SQA) function for the Guidance and Control Software (GCS) project which is part of a software error studies research program is described. The SQA plan outlines all of the procedures, controls, and audits to be carried out by the SQA organization to ensure adherence to the policies, procedures, and standards for the GCS project.

  15. Evaluation of multiple water quality indices for drinking and irrigation purposes for the Karoon river, Iran.

    PubMed

    Aminiyan, Milad Mirzaei; Aitkenhead-Peterson, Jacqueline; Aminiyan, Farzad Mirzaei

    2018-06-16

    The main purpose of this study was to evaluate the water quality of the Karoon river, which is a main river in Iran country. For this purpose, hydrochemical analyses of a database that maintained by the Water Resources Authority of Khuzestan Province, Iran's Ministry of Energy, were carried out. These data were compared with the maximum permissible limit values recommended by World Health Organization and Food and Agriculture Organization water standards for drinking and agricultural purposes, respectively. Also in this regard, multiple indices of water quality were utilized. However, not all indices gave similar rankings for water quality. According to the USSL diagram and Kelly ratio, Karoon's water quality is not suitable for irrigation purposes due to high salinity and moderate alkalinity. However, the results of the magnesium hazard analysis suggested that water quality for irrigation is acceptable. A Piper diagram illustrated that the most dominant water types during the 15 years of the study were Na-Cl and Na-SO 4 . The mineral saturation index also indicated that Na-Cl is the dominant water type. The water quality for drinking purpose was evaluated using a Schoeller diagram and water quality index (WQI). According to the computed WQI ranging from 111.9 to 194.0, the Karoon's water in the Khuzestan plain can be categorized as "poor water" for drinking purposes. Based on hydrochemical characteristics, years 2000-2007 and 2008-2014 were categorized into two clusters illustrating a decline in water quality between the two time periods.

  16. Case for Quality Assurance in ESP [English For Specific Purposes] Programmes.

    ERIC Educational Resources Information Center

    Tan San Yee, Christine

    There is now a need, just like in industry, for quality assurance in education, for injecting systematically planned and formal processes, precise definitions, objectivity, and measurability in education. The demand for educational excellence in industry is "out there," and companies in more advanced countries are partnering educational…

  17. Menu Planning in Residential Aged Care—The Level of Choice and Quality of Planning of Meals Available to Residents

    PubMed Central

    Abbey, Karen L.; Wright, Olivia R. L.; Capra, Sandra

    2015-01-01

    Background: Choice of food is an imperative aspect of quality of life for residents in Residential Aged Care Homes (RACHs), where overall choice and control is diminished upon entering a home to receive care. The purpose of this study was to examine the current strategies of menu planning in a range of RACHs in Australia, and whether this facilitated appropriate levels of choice for residents receiving texture modified and general diets. Methods: The study comprised a National Menu Survey using a new survey instrument collecting general information about the RACH and foodservice system, menu information and staffing information (n = 247); a national menu analysis (n = 161) and an observational case study of 36 meal environments. Results: Choice was low for the entire sample, but particularly for those receiving pureed texture modified diets. Evidence of menu planning to facilitate the inclusion of choice and alternatives was limited. Discussion: Regulation and monitoring of the Australian Aged Care Accreditation Standards needs to be strengthened to mandate improvement of the choice and variety offered to residents, particularly those on pureed texture modified diets. Further research on how menu choice and a lack of variety in meals affects the quality of life residents is needed in this context, but current evidence suggests the effect would be detrimental and undermine resident autonomy and nutritional status. PMID:26371040

  18. Evaluative methodology for comprehensive water quality management planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dyer, H. L.

    Computer-based evaluative methodologies have been developed to provide for the analysis of coupled phenomena associated with natural resource comprehensive planning requirements. Provisions for planner/computer interaction have been included. Each of the simulation models developed is described in terms of its coded procedures. An application of the models for water quality management planning is presented; and the data requirements for each of the models are noted.

  19. Analyzing the quality robustness of chemotherapy plans with respect to model uncertainties.

    PubMed

    Hoffmann, Anna; Scherrer, Alexander; Küfer, Karl-Heinz

    2015-01-01

    Mathematical models of chemotherapy planning problems contain various biomedical parameters, whose values are difficult to quantify and thus subject to some uncertainty. This uncertainty propagates into the therapy plans computed on these models, which poses the question of robustness to the expected therapy quality. This work introduces a combined approach for analyzing the quality robustness of plans in terms of dosing levels with respect to model uncertainties in chemotherapy planning. It uses concepts from multi-criteria decision making for studying parameters related to the balancing between the different therapy goals, and concepts from sensitivity analysis for the examination of parameters describing the underlying biomedical processes and their interplay. This approach allows for a profound assessment of a therapy plan, how stable its quality is with respect to parametric changes in the used mathematical model. Copyright © 2014 Elsevier Inc. All rights reserved.

  20. Managed Care Quality of Care and Plan Choice in New York SCHIP

    PubMed Central

    Liu, Hangsheng; Phelps, Charles E; Veazie, Peter J; Dick, Andrew W; Klein, Jonathan D; Shone, Laura P; Noyes, Katia; Szilagyi, Peter G

    2009-01-01

    Objective To examine whether low-income parents of children enrolled in the New York State Children's Health Insurance Program (SCHIP) choose managed care plans with better quality of care. Data Sources 2001 New York SCHIP evaluation data; 2001 New York State Managed Care Plan Performance Report; 2000 New York State Managed Care Enrollment Report. Study Design Each market was defined as a county. A final sample of 2,325 new enrollees was analyzed after excluding those in markets with only one SCHIP plan. Plan quality was measured using seven Consumer Assessment of Health Plans Survey (CAHPS) and three Health Plan Employer Data and Information Set (HEDIS) scores. A conditional logit model was applied with plan and individual/family characteristics as covariates. Principle Findings There were 30 plans in the 45 defined markets. The choice probability increased 2.5 percentage points for each unit increase in the average CAHPS score, and the association was significantly larger in children with special health care needs. However, HEDIS did not show any statistically significant association with plan choice. Conclusions Low-income parents do choose managed care plans with higher CAHPS scores for their newly enrolled children, suggesting that overall quality could improve over time because of the dynamics of enrollment. PMID:19208091

  1. 45 CFR 1304.60 - Deficiencies and quality improvement plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Deficiencies and quality improvement plans. 1304.60 Section 1304.60 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN... GRANTEE AND DELEGATE AGENCIES Implementation and Enforcement § 1304.60 Deficiencies and quality...

  2. 45 CFR 1304.60 - Deficiencies and quality improvement plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Deficiencies and quality improvement plans. 1304.60 Section 1304.60 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN... GRANTEE AND DELEGATE AGENCIES Implementation and Enforcement § 1304.60 Deficiencies and quality...

  3. 45 CFR 1304.60 - Deficiencies and quality improvement plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Deficiencies and quality improvement plans. 1304.60 Section 1304.60 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN... GRANTEE AND DELEGATE AGENCIES Implementation and Enforcement § 1304.60 Deficiencies and quality...

  4. 27 CFR 27.75 - Samples of distilled spirits, wine, and beer for quality control purposes.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... spirits, wine, and beer for quality control purposes. 27.75 Section 27.75 Alcohol, Tobacco Products and... DISTILLED SPIRITS, WINES, AND BEER General Requirements Exemptions § 27.75 Samples of distilled spirits, wine, and beer for quality control purposes. Samples of distilled spirits, wine, and beer in containers...

  5. 27 CFR 27.75 - Samples of distilled spirits, wine, and beer for quality control purposes.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... spirits, wine, and beer for quality control purposes. 27.75 Section 27.75 Alcohol, Tobacco Products and... DISTILLED SPIRITS, WINES, AND BEER General Requirements Exemptions § 27.75 Samples of distilled spirits, wine, and beer for quality control purposes. Samples of distilled spirits, wine, and beer in containers...

  6. 27 CFR 27.75 - Samples of distilled spirits, wine, and beer for quality control purposes.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... spirits, wine, and beer for quality control purposes. 27.75 Section 27.75 Alcohol, Tobacco Products and... DISTILLED SPIRITS, WINES, AND BEER General Requirements Exemptions § 27.75 Samples of distilled spirits, wine, and beer for quality control purposes. Samples of distilled spirits, wine, and beer in containers...

  7. 27 CFR 27.75 - Samples of distilled spirits, wine, and beer for quality control purposes.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... spirits, wine, and beer for quality control purposes. 27.75 Section 27.75 Alcohol, Tobacco Products and... DISTILLED SPIRITS, WINES, AND BEER General Requirements Exemptions § 27.75 Samples of distilled spirits, wine, and beer for quality control purposes. Samples of distilled spirits, wine, and beer in containers...

  8. 27 CFR 27.75 - Samples of distilled spirits, wine, and beer for quality control purposes.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... spirits, wine, and beer for quality control purposes. 27.75 Section 27.75 Alcohol, Tobacco Products and... DISTILLED SPIRITS, WINES, AND BEER General Requirements Exemptions § 27.75 Samples of distilled spirits, wine, and beer for quality control purposes. Samples of distilled spirits, wine, and beer in containers...

  9. Measurement Matters: Assessing Personal Qualities Other than Cognitive Ability for Educational Purposes

    ERIC Educational Resources Information Center

    Duckworth, Angela L.; Yeager, David Scott

    2015-01-01

    There has been perennial interest in personal qualities other than cognitive ability that determine success, including self-control, grit, growth mind-set, and many others. Attempts to measure such qualities for the purposes of educational policy and practice, however, are more recent. In this article, we identify serious challenges to doing so.…

  10. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barriermore » at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.« less

  11. Case study: reconciling the quality and safety gap through strategic planning.

    PubMed

    Jeffs, Lianne; Merkley, Jane; Jeffrey, Jana; Ferris, Ella; Dusek, Janice; Hunter, Catherine

    2006-05-01

    An essential outcome of professional practice environments is the provision of high-quality, safe nursing care. To mitigate the quality and safety chasm, nursing leadership at St. Michael's Hospital undertook a strategic plan to enhance the nursing professional practice environment. This case study outlines the development of the strategic planning process: the driving forces (platform); key stakeholders (process and players); vision, guiding principles, strategic directions, framework for action and accountability (plan); lessons learned (pearls); and next steps to moving forward the vision, strategic directions and accountability mechanisms (passion and perseverance).

  12. SU-F-T-338: Flattening Filter Free Photon Beams Can Achieve the Same Plan Quality as Conventional Flattened Beams for Prostate Radiotherapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kolar, M; Szwedowski, R; Greskovich, J

    Purpose: Some modern linear accelerators are equipped with one low energy flat beam and two flattening filter free (FFF) beams at high and low energies. The purpose of this study is to investigate whether the high energy FFF beam can produce the same plan quality as the conventional low energy flat beam, using a volumetric modulated arc (VMAT) technique for prostate patients. Methods: Ten prostate cancer patients were selected with a prescription of 78Gy. For each patient, three plans were created: (a) double arc flat 6MV plan used clinically; (b) double arc 10MV FFF plan; (c) single arc 10MV FFFmore » plan. Each plan was prescribed so that at least 95% of the PTV received the prescription dose. The following dosimetric endpoints were evaluated: volume receiving 78Gy (V78) of the CTV and PTV, PTV conformality index (CI, ratio of prescription isodose volume to the PTV volume), bladder volume receiving 70Gy (V70) and 60Gy (V60), rectum volume receiving 70Gy (V70) and 50Gy (V50), dose to 10cc of the rectum, and volume of both femoral heads receiving 50Gy (V50). Total monitor units for each plan were recorded. Results: No significant difference was found for all dosimetric endpoints between all plans (p>0.05). Compared to the 6MV plans, monitor units were higher with the double arc 10MV FFF plans and lower with the single arc 10MV FFF plans, 29% and 4% respectively. Conclusion: Both single arc and double arc 10MV FFF VMAT can achieve equivalent plan quality as 6MV flat beam double arc treatment plans. With the gantry speed restriction, a high dose rate of 2400MU/min may allow the optimizer to use more MUs than actually needed. Single arc 10MV FFF VMAT plans are a reasonable alternative to double arc 6MV flat beam VMAT plans.« less

  13. Groundwater Monitoring Plan. Volume 2. Final Quality Assurance Project Plan

    DTIC Science & Technology

    1993-10-01

    5 Table 4-2. US EPA Drinking Water MCLs ........................................ 4-6 Table 5-1. Sample Bottle Requirements, Preservation, and Holding... drinking water . " The types of quality control samples that will be collected during the Canal Creek groundwater monitoring program. ]- Jacobs...Revision No.: 0 Date: 10/27/93 Page: 6 of 9 Canal Creek Area, APG-EA, Maryland Groundwater Monitoring Plan, VOLUME I1 Table 4-2. US EPA Drinking Water

  14. Managing Air Quality - Multi-Pollutant Planning and Control

    EPA Pesticide Factsheets

    Describes how planning controls for multiple pollutants at the same time can save money and time and achieve significant benefits, and how control strategies can address both climate change and air quality.

  15. The role of CQI in the strategic planning process.

    PubMed

    Sahney, V K; Warden, G L

    1993-01-01

    This article describes the strategic planning process used to define the health care needs of a region and to prepare Henry Ford Health System (HFHS) to meet the needs of the 21st century. It presents key applications of continuous quality improvement in the development and implementation of the strategic plans for HFHS; explains how HFHS adapted the Deming/Shewhart cycle of continuous improvement for the purpose of improving its planning process; and delineates how the strategic planning, financial planning, and quality planning processes have been integrated.

  16. 75 FR 61369 - Revisions to the California State Implementation Plan; Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... the California State Implementation Plan; Sacramento Metropolitan Air Quality Management District... approve a revision to the Sacramento Metropolitan Air Quality Management District's portion of the... Metropolitan Air Quality Management District (SMAQMD) adopted the ``Ozone State Implementation Plan Revision...

  17. SU-F-T-453: Improved Head and Neck SBRT Treatment Planning Using PlanIQ

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, H; Wang, C; Phan, J

    Purpose: Treatment planning for Head and Neck(HN) re-irradiation is a challenge because of ablative doses to target volume and strict critical structure constraints. PlanIQ(Sun Nuclear Corporation) can assess the feasibility of clinical goals and quantitatively measure plan quality. Here, we assess whether incorporation of PlanIQ in our SBRT treatment planning process can improve plan quality and planning efficiency. Methods: From 2013–2015, 35 patients (29 retrospective, 6 prospective) with recurrent HN tumors were treated with SBRT using VMAT treatment plans. The median prescription dose was 45 Gy in 5 fractions. We retrospectively reviewed the treatment plans and physician directives of ourmore » first 29 patients and generated score functions of the dosimetric goals used in our practice and obtained a baseline histogram. We then re-optimized 12 plans that had potential to further reduce organs-at-risk (OAR) doses according to PlanIQ feasibility DVH and plan quality analysis and compared them to the original plans. We applied our new PlanIQ-assisted planning process for our 6 most recently treated patients and evaluated the plan quality and planning efficiency. Results: The mean plan quality metric(PQM) and feasibility adjusted PQM(APQM) scores of our initial 29 treatment plans were 77.1±13.1 and 88.7±11.9, respectively (0–100 scale). The PQM and APQM scores for the 12 optimized plans improved from 75.9±11.0 and 85.1±10.2 to 80.7±9.3 and 90.2±8.0, respectively (p<0.005). Using our newly developed PlanIQ-assisted planning process, the PQM and APQM scores for the 6 most recently treated patients were 93.6±6.5 and 99.1±0.6, respectively. The planning goals were more straightforward to minimize OAR doses during optimization, thus less planning and revision time were used than before. Conclusion: PlanIQ has the potential to provide achievable planning goals and also improve plan quality and planning efficiency.« less

  18. Visions, Strategic Planning, and Quality--More than Hype.

    ERIC Educational Resources Information Center

    Kaufman, Roger

    1996-01-01

    Discusses the need to shift from the old models for organizational development to the new methods of quality management and continuous improvement, visions and visioning, and strategic planning, despite inappropriate criticisms they receive. (AEF)

  19. Region 7 States Air Quality Monitoring Plans - Iowa

    EPA Pesticide Factsheets

    National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo

  20. Region 7 States Air Quality Monitoring Plans - Missouri

    EPA Pesticide Factsheets

    National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo

  1. Region 7 States Air Quality Monitoring Plans - Nebraska

    EPA Pesticide Factsheets

    National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo

  2. Region 7 States Air Quality Monitoring Plans - Kansas

    EPA Pesticide Factsheets

    National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo

  3. Improve strategic supplier performance using DMAIC to develop a Quality Improvement Plan

    NASA Astrophysics Data System (ADS)

    Jardim, Kevin P.

    Supplier performance that meets the requirements of the customer has long plagued quality professionals. Despite the vast efforts by organizations to improve supplier performance, little has been done to standardize the plan to improve performance. This project presents a guideline and problem-solving strategy using a Define, Measure, Analyze, Improve, and Control (DMAIC) structured tool that will assist in the management and improvement of supplier performance. An analysis of benchmarked Quality Improvement Plans indicated that this topic needs more focus on how to accomplish improved supplier performance. This project is part of a growing body of supplier continuous improvement efforts. With the input of Zodiac Aerospace quality professionals this project's results provide a solution to Quality Improvement Plans and show objective evidence of its benefits. This project contributes to the future research on similar topics.

  4. SU-E-T-106: An Institutional Review of Using Commercially Available Software to Evaluate Treatment Plan Quality for Various Treatment Sites and Beam Deliveries

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Esquivel, C; Patton, L; Walker, S

    Purpose: Use Sun Nuclear Quality Reports™ with PlanIQ™ to evaluate different treatment delivery techniques for various treatment sites. Methods: Fifteen random patients with different treatment sites were evaluated. These include the Head/Neck, prostate, pelvis, lung, esophagus, axilla, bladder and abdomen. Initially, these sites were planned on the Pinnacle {sup 3} V9.6 treatment planning system and utilized nine 6MV step-n-shoot IMRT fields. The RT plan, dose and structure sets were sent to Quality Reports™ where a DVH was recreated and the plans were compared to a unique Plan Algorithm for each treatment site. Each algorithm has its own plan quality metricsmore » and objectives, which include the PTV coverage, PTV maximum dose, the prescription dose outside the target, doses to the critical structures, and the global maximum dose and its location. Each plan was scored base on meeting each objective. Plans may have been reoptimized and reevaluated with Quality Reports™ based on the initial score. PlanIQ™ was used to evaluate if any objective not met was achievable or difficult to obtain. A second plan using VMAT delivery was created for each patient and scored with Quality Reports™. Results: There were a wide range of scores for the different treatment sites with some scoring better for IMRT plans and some better for the VMAT deliveries. The variation in the scores could be attributed to the treatment site, location, and shape of the target. Most deliveries were chosen for the VMAT due to the short treatment times and quick patient throughput with acceptable plan scores. Conclusion: The tools are provided for both physician and dosimetrist to objectively evaluate the use of VMAT delivery versus the step-n-shoot IMRT delivery for various sites. PlanIQ validates if objectives can be met. For the physicist, a concise pass/fail report is created for plan evaluation.« less

  5. Lake Champlain TMDL Modeling Quality Assurance Project Plan

    EPA Pesticide Factsheets

    This document presents the quality assurance project plan for providing support to US EPA Region 1 in revising the Lake Champlain Total Maximum Daily Load, under Contract Number EP-C-08-004, Task Order 80.

  6. A deterministic aggregate production planning model considering quality of products

    NASA Astrophysics Data System (ADS)

    Madadi, Najmeh; Yew Wong, Kuan

    2013-06-01

    Aggregate Production Planning (APP) is a medium-term planning which is concerned with the lowest-cost method of production planning to meet customers' requirements and to satisfy fluctuating demand over a planning time horizon. APP problem has been studied widely since it was introduced and formulated in 1950s. However, in several conducted studies in the APP area, most of the researchers have concentrated on some common objectives such as minimization of cost, fluctuation in the number of workers, and inventory level. Specifically, maintaining quality at the desirable level as an objective while minimizing cost has not been considered in previous studies. In this study, an attempt has been made to develop a multi-objective mixed integer linear programming model that serves those companies aiming to incur the minimum level of operational cost while maintaining quality at an acceptable level. In order to obtain the solution to the multi-objective model, the Fuzzy Goal Programming approach and max-min operator of Bellman-Zadeh were applied to the model. At the final step, IBM ILOG CPLEX Optimization Studio software was used to obtain the experimental results based on the data collected from an automotive parts manufacturing company. The results show that incorporating quality in the model imposes some costs, however a trade-off should be done between the cost resulting from producing products with higher quality and the cost that the firm may incur due to customer dissatisfaction and sale losses.

  7. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0920; FRL-9779-1] Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South...

  8. Total Quality Management Implementation Plan for Military Personnel Management

    DTIC Science & Technology

    1989-09-01

    2050.. )ATE 3. REPORT TYPE AND DATES CO VERED 4. TITLE AND SUBTITLE 5,rrmir18 . FUNDING NUMBERS Total Quality Management Implementation Plan for...SUBJECT TERMS 15. NUMBER OF PAGES TQM (Total Quality Management ), Military Personnel Management, Continuous Process Improvement 16. PRICE CODE 17. SECURITY...UNCLASSIFIED UNCLASSIFIED UL NSN 7540-01-280-5500 Standard Form 298 (Rev. 2-89) Prescribed by ANSI Std Z39-16 296-102 TOTAL QUALITY MANAGEMENT I

  9. 78 FR 23524 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Particulate Matter...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... Promulgation of Air Quality Implementation Plans; Indiana; Particulate Matter Ambient Air Quality Standards... revise the Indiana State Implementation Plan (SIP) for particulate matter under the Clean Air Act. This submission contains the 24-hour fine particle National Ambient Air Quality Standards (NAAQS) promulgated by...

  10. Experience-based quality control of clinical intensity-modulated radiotherapy planning.

    PubMed

    Moore, Kevin L; Brame, R Scott; Low, Daniel A; Mutic, Sasa

    2011-10-01

    To incorporate a quality control tool, according to previous planning experience and patient-specific anatomic information, into the intensity-modulated radiotherapy (IMRT) plan generation process and to determine whether the tool improved treatment plan quality. A retrospective study of 42 IMRT plans demonstrated a correlation between the fraction of organs at risk (OARs) overlapping the planning target volume and the mean dose. This yielded a model, predicted dose = prescription dose (0.2 + 0.8 [1 - exp(-3 overlapping planning target volume/volume of OAR)]), that predicted the achievable mean doses according to the planning target volume overlap/volume of OAR and the prescription dose. The model was incorporated into the planning process by way of a user-executable script that reported the predicted dose for any OAR. The script was introduced to clinicians engaged in IMRT planning and deployed thereafter. The script's effect was evaluated by tracking δ = (mean dose-predicted dose)/predicted dose, the fraction by which the mean dose exceeded the model. All OARs under investigation (rectum and bladder in prostate cancer; parotid glands, esophagus, and larynx in head-and-neck cancer) exhibited both smaller δ and reduced variability after script implementation. These effects were substantial for the parotid glands, for which the previous δ = 0.28 ± 0.24 was reduced to δ = 0.13 ± 0.10. The clinical relevance was most evident in the subset of cases in which the parotid glands were potentially salvageable (predicted dose <30 Gy). Before script implementation, an average of 30.1 Gy was delivered to the salvageable cases, with an average predicted dose of 20.3 Gy. After implementation, an average of 18.7 Gy was delivered to salvageable cases, with an average predicted dose of 17.2 Gy. In the prostate cases, the rectum model excess was reduced from δ = 0.28 ± 0.20 to δ = 0.07 ± 0.15. On surveying dosimetrists at the end of the study, most reported that the script

  11. 23 CFR 450.300 - Purpose.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Purpose. 450.300 Section 450.300 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.300 Purpose. The purposes of this...

  12. 23 CFR 450.300 - Purpose.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Purpose. 450.300 Section 450.300 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.300 Purpose. The purposes of this...

  13. 23 CFR 450.300 - Purpose.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Purpose. 450.300 Section 450.300 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.300 Purpose. The purposes of this...

  14. 23 CFR 450.300 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Purpose. 450.300 Section 450.300 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.300 Purpose. The purposes of this...

  15. 23 CFR 450.300 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Purpose. 450.300 Section 450.300 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.300 Purpose. The purposes of this...

  16. Association Between Health Plan Exit From Medicaid Managed Care and Quality of Care, 2006-2014

    PubMed Central

    Schpero, William L.; Schlesinger, Mark J.; Trivedi, Amal N.

    2017-01-01

    Importance State Medicaid programs have increasingly contracted with insurers to provide medical care services for enrollees (Medicaid managed care plans). Insurers that provide these plans can exit Medicaid programs each year, with unclear effects on quality of care and health care experiences. Objective To determine the frequency and interstate variation of health plan exit from Medicaid managed care and evaluate the relationship between health plan exit and market-level quality. Design, Setting, and Participants Retrospective cohort of all comprehensive Medicaid managed care plans (N = 390) during the interval 2006-2014. Exposures Plan exit, defined as the withdrawal of a managed care plan from a state’s Medicaid program. Main Outcomes and Measures Eight measures from the Healthcare Effectiveness Data and Information Set were used to construct 3 composite indicators of quality (preventive care, chronic disease care management, and maternity care). Four measures from the Consumer Assessment of Healthcare Providers and Systems were combined into a composite indicator of patient experience, reflecting the proportion of beneficiaries rating experiences as 8 or above on a 0-to-10–point scale. Outcome data were available for 248 plans (68% of plans operating prior to 2014, representing 78% of beneficiaries). Results Of the 366 comprehensive Medicaid managed care plans operating prior to 2014, 106 exited Medicaid. These exiting plans enrolled 4 848 310 Medicaid beneficiaries, with a mean of 606 039 beneficiaries affected by plan exits annually. Six states had a mean of greater than 10% of Medicaid managed care recipients enrolled in plans that exited, whereas 10 states experienced no plan exits. Plans that exited from a state’s Medicaid market performed significantly worse prior to exiting than those that remained in terms of preventive care (57.5% vs 60.4%; difference, 2.9% [95% CI, 0.3% to 5.5%]), maternity care (69.7% vs 73.6%; difference, 3.8% [95

  17. Association Between Health Plan Exit From Medicaid Managed Care and Quality of Care, 2006-2014.

    PubMed

    Ndumele, Chima D; Schpero, William L; Schlesinger, Mark J; Trivedi, Amal N

    2017-06-27

    State Medicaid programs have increasingly contracted with insurers to provide medical care services for enrollees (Medicaid managed care plans). Insurers that provide these plans can exit Medicaid programs each year, with unclear effects on quality of care and health care experiences. To determine the frequency and interstate variation of health plan exit from Medicaid managed care and evaluate the relationship between health plan exit and market-level quality. Retrospective cohort of all comprehensive Medicaid managed care plans (N = 390) during the interval 2006-2014. Plan exit, defined as the withdrawal of a managed care plan from a state's Medicaid program. Eight measures from the Healthcare Effectiveness Data and Information Set were used to construct 3 composite indicators of quality (preventive care, chronic disease care management, and maternity care). Four measures from the Consumer Assessment of Healthcare Providers and Systems were combined into a composite indicator of patient experience, reflecting the proportion of beneficiaries rating experiences as 8 or above on a 0-to-10-point scale. Outcome data were available for 248 plans (68% of plans operating prior to 2014, representing 78% of beneficiaries). Of the 366 comprehensive Medicaid managed care plans operating prior to 2014, 106 exited Medicaid. These exiting plans enrolled 4 848 310 Medicaid beneficiaries, with a mean of 606 039 beneficiaries affected by plan exits annually. Six states had a mean of greater than 10% of Medicaid managed care recipients enrolled in plans that exited, whereas 10 states experienced no plan exits. Plans that exited from a state's Medicaid market performed significantly worse prior to exiting than those that remained in terms of preventive care (57.5% vs 60.4%; difference, 2.9% [95% CI, 0.3% to 5.5%]), maternity care (69.7% vs 73.6%; difference, 3.8% [95% CI, 1.7% to 6.0%]), and patient experience (73.5% vs 74.8%; difference, 1.3% [95% CI, 0.6% to 1

  18. 75 FR 54031 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ... below. FOR FURTHER INFORMATION CONTACT: Doris Lo, EPA Region IX, (415) 972- 3959, lo[email protected] Meredith Kurpius, EPA Region 9, Air Quality Assessment Office, to Doris Lo, EPA Region 9, Air Planning... Officer, GBUAPCD, to Doris Lo, EPA Region 9, Air Planning Office, with attachments. The Coso Operating...

  19. Measurement Matters: Assessing Personal Qualities Other Than Cognitive Ability for Educational Purposes

    PubMed Central

    Duckworth, Angela L.; Yeager, David Scott

    2016-01-01

    There has been perennial interest in personal qualities other than cognitive ability that determine success, including self-control, grit, growth mindset, and many others. Attempts to measure such qualities for the purposes of educational policy and practice, however, are more recent. In this article, we identify serious challenges to doing so. We first address confusion over terminology, including the descriptor “non-cognitive.” We conclude that debate over the optimal name for this broad category of personal qualities obscures substantial agreement about the specific attributes worth measuring. Next, we discuss advantages and limitations of different measures. In particular, we compare self-report questionnaires, teacher-report questionnaires, and performance tasks, using self-control as an illustrative case study to make the general point that each approach is imperfect in its own way. Finally, we discuss how each measure’s imperfections can affect its suitability for program evaluation, accountability, individual diagnosis, and practice improvement. For example, we do not believe any available measure is suitable for between-school accountability judgments. In addition to urging caution among policymakers and practitioners, we highlight medium-term innovations that may make measures of these personal qualities more suitable for educational purposes. PMID:27134288

  20. 23 CFR 450.200 - Purpose.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Purpose. 450.200 Section 450.200 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.200 Purpose. The purpose of this subpart...

  1. 23 CFR 450.200 - Purpose.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Purpose. 450.200 Section 450.200 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.200 Purpose. The purpose of this subpart...

  2. 23 CFR 450.100 - Purpose.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Purpose. 450.100 Section 450.100 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Transportation Planning and Programming Definitions § 450.100 Purpose. The purpose of this subpart...

  3. 23 CFR 450.100 - Purpose.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Purpose. 450.100 Section 450.100 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Transportation Planning and Programming Definitions § 450.100 Purpose. The purpose of this subpart...

  4. 23 CFR 450.200 - Purpose.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Purpose. 450.200 Section 450.200 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.200 Purpose. The purpose of this subpart...

  5. 23 CFR 450.100 - Purpose.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Purpose. 450.100 Section 450.100 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Transportation Planning and Programming Definitions § 450.100 Purpose. The purpose of this subpart...

  6. 23 CFR 450.100 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Purpose. 450.100 Section 450.100 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Transportation Planning and Programming Definitions § 450.100 Purpose. The purpose of this subpart...

  7. 23 CFR 450.200 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Purpose. 450.200 Section 450.200 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.200 Purpose. The purpose of this subpart...

  8. 23 CFR 450.100 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Purpose. 450.100 Section 450.100 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Transportation Planning and Programming Definitions § 450.100 Purpose. The purpose of this subpart...

  9. 23 CFR 450.200 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Purpose. 450.200 Section 450.200 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.200 Purpose. The purpose of this subpart...

  10. 78 FR 63878 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revised Ambient Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ...] Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revised Ambient Air Quality... State Implementation Plan (SIP). The revisions add ambient air quality standards and associated... Ambient Air Quality Standards (NAAQS) for PM 2.5 . EPA is approving these revisions in accordance with the...

  11. Analyzing the efficiency of short-term air quality plans in European cities, using the CHIMERE air quality model.

    PubMed

    Thunis, P; Degraeuwe, B; Pisoni, E; Meleux, F; Clappier, A

    2017-01-01

    Regional and local authorities have the obligation to design air quality plans and assess their impacts when concentration levels exceed the limit values. Because these limit values cover both short- (day) and long-term (year) effects, air quality plans also follow these two formats. In this work, we propose a methodology to analyze modeled air quality forecast results, looking at emission reduction for different sectors (residential, transport, agriculture, etc.) with the aim of supporting policy makers in assessing the impact of short-term action plans. Regarding PM 10 , results highlight the diversity of responses across European cities, in terms of magnitude and type that raises the necessity of designing area-specific air quality plans. Action plans extended from 1 to 3 days (i.e., emissions reductions applied for 24 and 72 h, respectively) point to the added value of trans-city coordinated actions. The largest benefits are seen in central Europe (Vienna, Prague) while major cities (e.g., Paris) already solve a large part of the problem on their own. Eastern Europe would particularly benefit from plans based on emission reduction in the residential sectors; while in northern cities, agriculture seems to be the key sector on which to focus attention. Transport is playing a key role in most cities whereas the impact of industry is limited to a few cities in south-eastern Europe. For NO 2 , short-term action plans focusing on traffic emission reductions are efficient in all cities. This is due to the local character of this type of pollution. It is important, however, to stress that these results remain dependent on the selected months available for this study.

  12. Arizona Air Quality State Implementation Plans; Final Approval; Douglas, Arizona; Second 10-Year Sulfur Dioxide Maintenance Plan

    EPA Pesticide Factsheets

    EPA is taking final rulemaking action to approve, as part of the State Implementation Plan (SIP) for the State of Arizona, the second 10-year maintenance plan for the Douglas maintenance area for the 1971 National Ambient Air Quality Standards for SO2.

  13. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Irene Farnham

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurancemore » Project Plan, Nevada Test Site, Nevada, Revision 4.« less

  14. Using a Personal Development Plan for Different Purposes: Its Influence on Undertaking Learning Activities and Job Performance

    ERIC Educational Resources Information Center

    Beausaert, Simon A. J.; Segers, Mien S. R.; Gijselaers, Wim H.

    2011-01-01

    Today, organizations are increasingly implementing assessment tools such as Personal Development Plans. Although the true power of the tool lies in supporting the employee's continuing professional development, organizations implement the tool for various different purposes, professional development purposes on the one hand and promotion/salary…

  15. Writing Plan Quality: Relevance to Writing Scores

    ERIC Educational Resources Information Center

    Chai, Constance

    2006-01-01

    If writing matters, how can we improve it? This study investigated the nature of writing plan quality and its relationship to the ensuing writing scores. Data were drawn from the 1998 Provincial Learning Assessment Programme (PLAP) in Writing, which was administered to pupils in Grades 4, 7, and 10 across British Columbia, Canada. Common features…

  16. Guidelines for preparing a quality assurance plan for district offices of the U.S. Geological Survey

    USGS Publications Warehouse

    Schroder, L.J.; Shampine, W.J.

    1992-01-01

    The U.S. Geological Survey has a policy that requires each District office to prepare a Quality Assurance Plan. This plan is a combination of a District's management principles and quality assurance processes. The guidelines presented in this report provide a framework or expanded outline that a District can use to prepare a plan. Parti- cular emphasis is given to a District's: (1) quality assurance policies; (2) organization and staff responsibilities; and (3) program and project planning. The guidelines address the 'how', 'what', and 'who' questions that need to be answered when a District Quality Assurance Plan is prepared.

  17. DPSC (Defense Personnel Support Center) Total Quality Management Master Plan

    DTIC Science & Technology

    1989-07-01

    SUBTITLE 5. FUNDING NUMBERS DPSC Total Quality Management Master Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) B. PERFORMING...quality supported solider, sailor, airman and marine. % j cl 1 14. SUBJECT TERMS I 1S. NUMBER OF PAGES TQM (Total Quality Management ), Continuous...THE COMMANDER ON TOTAL QUALITY MANAGEMENT i SECTION I INTRODUCTION 1 II CONCEPTS 6 TQM Basics 7 Continuous Process Improvement 7 DoD TQM Philosophy 9

  18. The Individualized Quality Control Plan - Coming Soon to Clinical Microbiology Laboratories Everywhere!

    PubMed

    Anderson, Nancy

    2015-11-15

    As of January 1, 2016, microbiology laboratories can choose to adopt a new quality control option, the Individualized Quality Control Plan (IQCP), under the Clinical Laboratory Improvement Amendments of 1988 (CLIA). This voluntary approach increases flexibility for meeting regulatory requirements and provides laboratories the opportunity to customize QC for their testing in their unique environments and by their testing personnel. IQCP is an all-inclusive approach to quality based on risk management to address potential errors in the total testing process. It includes three main steps, (1) performing a risk assessment, (2) developing a QC plan, and (3) monitoring the plan through quality assessment. Resources are available from the Centers for Medicare & Medicaid Services, Centers for Disease Control and Prevention, American Society for Microbiology, Clinical and Laboratory Standards Institute, and accrediting organizations, such as the College of American Pathologists and Joint Commission, to assist microbiology laboratories implementing IQCP.

  19. Assessing quality of care for migraineurs: a model health plan measurement set.

    PubMed

    Leas, Brian F; Gagne, Joshua J; Goldfarb, Neil I; Rupnow, Marcia F T; Silberstein, Stephen

    2008-08-01

    Quality of care measures are increasingly important to health plans, purchasers, physicians, and patients. Appropriate measures can be used to assess quality and evaluate improvement and are necessary components of pay-for-performance programs. Despite the broad scope of activity in the development of quality measures, migraine headache has received little attention. Given the enormous costs associated with migraine, especially in terms of lost productivity and preventable health care utilization, health plans could gain from a structured approach to measuring the quality of migraine care their beneficiaries receive. A potential migraine quality measurement set was developed through a review of migraine care literature and guidelines, interviews with leaders in migraine care, health care purchasing, and managed care, and the assembly of an advisory board. The board discussed candidate measures and established consensus on a testable measurement set. Twenty measures were developed, focused primarily on diagnosis and utilization. Areas of utilization include physician visits, emergency department visits, hospitalizations, and imaging. Use of both acute and preventive medications is included. More complex aspects of migraine care are also addressed, including triptan overuse, the relationship between acute and preventive medications, and follow-up after emergency department visits. The measures are currently being tested in health plans to assess their feasibility and value. A compelling case can be made for the development of migraine-specific quality measures for health plans. This effort to develop and test a starter set of measures should lead to new and innovative efforts to assess and improve quality of care for migraineurs.

  20. Quality program plan for the Ultraviolet Spectrometer Experiment S169, Revision C

    NASA Technical Reports Server (NTRS)

    Vinson, W. W.

    1971-01-01

    The quality progress plan establishes the requirements for a system of controls to assure compliance with the quality assurance requirements as set forth in NASA quality program provisions for aeronautical and space system contractors.

  1. State Policies and Planning to Increase Attainment, Quality, and Productivity

    ERIC Educational Resources Information Center

    Lingenfelter, Paul E.

    2007-01-01

    This article examines why state planning and policy for higher education are increasingly focused on increasing educational attainment, quality, and the productivity of the system. It presents four "stories" which illustrate initiatives to improve attainment, quality, and productivity, but fall far short of exhausting the available material.

  2. 78 FR 59840 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ...] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District... of plan. * * * * * (c) * * * (428) * * * (i) * * * (B) Antelope Valley Air Quality Management...) * * * (i) * * * (B) Antelope Valley Air Quality Management District. (1) Rule 431.1, ``Sulfur Content of...

  3. The rhetoric and realities of integrating air quality into the local transport planning process in English local authorities.

    PubMed

    Olowoporoku, Dotun; Hayes, Enda; Longhurst, James; Parkhurst, Graham

    2012-06-30

    Regardless of its intent and purposes, the first decade of the Local Air Quality Management (LAQM) framework had little or no effect in reducing traffic-related air pollution in the UK. Apart from the impact of increased traffic volumes, the major factor attributed to this failure is that of policy disconnect between the process of diagnosing air pollution and its management, thereby limiting the capability of local authorities to control traffic-related sources of air pollution. Integrating air quality management into the Local Transport Plan (LTP) process therefore presents opportunities for enabling political will, funding and joined-up policy approach to reduce this limitation. However, despite the increased access to resources for air quality measures within the LTP process, there are local institutional, political and funding constraints which reduce the impact of these policy interventions on air quality management. This paper illustrate the policy implementation gaps between central government policy intentions and the local government process by providing evidence of the deprioritisation of air quality management compared to the other shared priorities in the LTP process. We draw conclusions on the policy and practice of integrating air quality management into transport planning. The evidence thereby indicate the need for a policy shift from a solely localised hotspot management approach, in which the LAQM framework operates, to a more holistic management of vehicular emissions within wider spatial administrative areas. Copyright © 2012 Elsevier Ltd. All rights reserved.

  4. 77 FR 60661 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; South Bend-Elkhart...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-04

    ... Promulgation of Air Quality Implementation Plans; Indiana; South Bend-Elkhart, Indiana Ozone Maintenance Plan..., Indiana 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) by replacing the... Vehicle Emissions Simulator (MOVES) 2010a emissions model. Indiana submitted this request to EPA for...

  5. 78 FR 8485 - Approval and Promulgation of Air Quality Implementation Plans; Michigan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... Promulgation of Air Quality Implementation Plans; Michigan AGENCY: Environmental Protection Agency (EPA... control), R336.1240 (Required air quality models), R336.1241 (Air quality modeling demonstration... nonattainment air quality permitting regulations found in 40 CFR 51.165(a) and (b). EPA has found that the rules...

  6. 78 FR 7703 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... the California State Implementation Plan, South Coast Air Quality Management District, Proposed Rule... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... digesters. Rule 1127 was designed to implement the 2003 Air Quality Management Plan (AQMP) control measure...

  7. Supply Operations (DLA-O) Total Quality Management (TQM) Master Plan

    DTIC Science & Technology

    1989-07-01

    This document briefly outlines the DLA Directorate of Supply Operations plan to implement total quality management . It seeks to provide better...service to customers at a lower cost through continuous process improvement and commitment from everyone in the organization. Keywords: TQM (total Quality Management ), Supply operations; Continuous process improvement. (KR)

  8. 75 FR 19886 - Approval and Promulgation of Air Quality Implementation Plans; Wyoming; Revisions to the Wyoming...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Promulgation of Air Quality Implementation Plans; Wyoming; Revisions to the Wyoming Air Quality Standards and.... Wyoming has revised its Air Quality Standards and Regulations, specifically Chapter 1, Section 5... Wyoming's State Implementation Plan (SIP). These revisions amend Wyoming's Air Quality Standards and...

  9. The Roles of Cost and Quality Information in Medicare Advantage Plan Enrollment Decisions: an Observational Study.

    PubMed

    Reid, Rachel O; Deb, Partha; Howell, Benjamin L; Conway, Patrick H; Shrank, William H

    2016-02-01

    To facilitate informed decision-making in the Medicare Advantage marketplace, the Centers for Medicare & Medicaid Services publishes plan information on the Medicare Plan Finder website, including costs, benefits, and star ratings reflecting quality. Little is known about how beneficiaries weigh costs versus quality in enrollment decisions. We aimed to assess associations between publicly reported Medicare Advantage plan attributes (i.e., costs, quality, and benefits) and brand market share and beneficiaries' enrollment decisions. We performed a nationwide, beneficiary-level cross-sectional analysis of 847,069 beneficiaries enrolling in Medicare Advantage for the first time in 2011. Matching beneficiaries with their plan choice sets, we used conditional logistic regression to estimate associations between plan attributes and enrollment to assess the proportion of enrollment variation explained by plan attributes and willingness to pay for quality. Relative to the total variation explained by the model, the variation in plan choice explained by premiums (25.7 %) and out-of-pocket costs (11.6 %) together explained nearly three times as much as quality ratings (13.6 %), but brand market share explained the most variation (35.3 %). Further, while beneficiaries were willing to pay more in total annual combined premiums and out-of-pocket costs for higher-rated plans (from $4,154.93 for 2.5-star plans to $5,698.66 for 5-star plans), increases in willingness to pay diminished at higher ratings, from $549.27 (95 %CI: $541.10, $557.44) for a rating increase from 2.5 to 3 stars to $68.22 (95 %CI: $61.44, $75.01) for an increase from 4.5 to 5 stars. Willingness to pay varied among subgroups: beneficiaries aged 64-65 years were more willing to pay for higher-rated plans, while black and rural beneficiaries were less willing to pay for higher-rated plans. While beneficiaries prefer higher-quality and lower-cost Medicare Advantage plans, marginal utility for quality

  10. Groundwater quality assessment for domestic and agriculture purposes in Puducherry region

    NASA Astrophysics Data System (ADS)

    Sridharan, M.; Senthil Nathan, D.

    2017-11-01

    Totally about 174 groundwater samples have been collected during pre-monsoon and post-monsoon season to study the suitability for domestic and agriculture purposes along the coastal aquifers of Puducherry region. Parameters such as pH, total dissolved solids (TDS), electrical conductivity (EC), sodium (Na), potassium (K), calcium (Ca), magnesium (Mg), bicarbonate (HCO3), chloride (Cl) and sulfate (SO4) were analyzed to assess the suitability of groundwater for domestic purposes. Sodium adsorption ratio (SAR), magnesium adsorption ratio (MAR), residual sodium bicarbonate (RSC), soluble sodium percentage (Na%), permeability index (PI) and chlorinity index were assessed for irrigation purposes. The higher concentration of ions such as Na, Ca, Cl and So4 indicates seawater intrusion, mineral dissolution, intense agricultural practices and improper sewage disposal. The level of EC, TDS and hardness in the water samples indicates that maximum of them are suitable for drinking and domestic purposes. The parameters such as SAR, Na%, PI, MAR and Chlorinity index indicates that majority of water sample are very good to moderately suitable for agriculture. In pre-monsoon, RSC of about 5.7% of samples was higher which when used for a longer time alter the soil properties and reduce crop production. Wilcox diagram suggests that water samples are of medium saline to low sodium type indicating that groundwater is suitable for irrigation. Temporal variation of groundwater quality shows significant increasing trend in EC, TDS and ions like Mg, K and Cl in the last decade, mainly due to anthropogenic activities with little geogenic impact in the quality of groundwater.

  11. Individualized Quality Control Plan (IQCP): Is It Value-Added for Clinical Microbiology?

    PubMed Central

    Miller, Melissa B.; Hindler, Janet

    2015-01-01

    The Center for Medicaid and Medicare Services (CMS) recently published their Individualized Quality Control Plan (IQCP [https://www.cms.gov/regulations-and-guidance/legislation/CLIA/Individualized_Quality_Control_Plan_IQCP.html]), which will be the only option for quality control (QC) starting in January 2016 if laboratories choose not to perform Clinical Laboratory Improvement Act (CLIA) [U.S. Statutes at Large 81(1967):533] default QC. Laboratories will no longer be able to use “equivalent QC” (EQC) or the Clinical and Laboratory Standards Institute (CLSI) standards alone for quality control of their microbiology systems. The implementation of IQCP in clinical microbiology laboratories will most certainly be an added burden, the benefits of which are currently unknown. PMID:26447112

  12. 40 CFR 52.1520 - Identification of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... plan. (a) Purpose and scope. This section sets forth the applicable State Implementation Plan for New... provisions for retention and availability of air quality data Statewide 3/23/1972 7/27/1972, 37 FR 15080 See..., 1998 stating a negative declaration for the aerospace coating operations Control Techniques Guideline...

  13. 40 CFR 52.1520 - Identification of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... plan. (a) Purpose and scope. This section sets forth the applicable State Implementation Plan for New... provisions for retention and availability of air quality data Statewide 3/23/1972 7/27/1972, 37 FR 15080 See..., 1998 stating a negative declaration for the aerospace coating operations Control Techniques Guideline...

  14. 45 CFR 2531.10 - What are the purposes of the Investment for Quality and Innovation activities?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Quality and Innovation activities? 2531.10 Section 2531.10 Public Welfare Regulations Relating to Public... INVESTMENT FOR QUALITY AND INNOVATION ACTIVITIES § 2531.10 What are the purposes of the Investment for Quality and Innovation activities? Investment for Quality and Innovation activities are designed to...

  15. 45 CFR 2531.10 - What are the purposes of the Investment for Quality and Innovation activities?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Quality and Innovation activities? 2531.10 Section 2531.10 Public Welfare Regulations Relating to Public... INVESTMENT FOR QUALITY AND INNOVATION ACTIVITIES § 2531.10 What are the purposes of the Investment for Quality and Innovation activities? Investment for Quality and Innovation activities are designed to...

  16. 45 CFR 2531.10 - What are the purposes of the Investment for Quality and Innovation activities?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Quality and Innovation activities? 2531.10 Section 2531.10 Public Welfare Regulations Relating to Public... INVESTMENT FOR QUALITY AND INNOVATION ACTIVITIES § 2531.10 What are the purposes of the Investment for Quality and Innovation activities? Investment for Quality and Innovation activities are designed to...

  17. 45 CFR 2531.10 - What are the purposes of the Investment for Quality and Innovation activities?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Quality and Innovation activities? 2531.10 Section 2531.10 Public Welfare Regulations Relating to Public... INVESTMENT FOR QUALITY AND INNOVATION ACTIVITIES § 2531.10 What are the purposes of the Investment for Quality and Innovation activities? Investment for Quality and Innovation activities are designed to...

  18. 45 CFR 2531.10 - What are the purposes of the Investment for Quality and Innovation activities?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Quality and Innovation activities? 2531.10 Section 2531.10 Public Welfare Regulations Relating to Public... INVESTMENT FOR QUALITY AND INNOVATION ACTIVITIES § 2531.10 What are the purposes of the Investment for Quality and Innovation activities? Investment for Quality and Innovation activities are designed to...

  19. SU-F-T-429: Craniospinal Irradiation by VMAT Technique: Impact of FFF Beam and High Resolution MLC On Plan Quality

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ganesh, T; Sarkar, B; Munshi, A

    2016-06-15

    Purpose: Objective of this study was to evaluate the impact of using flattening filter free (FFF) beam with 0.5 cm multileaf collimator (MLC) leaves over conventional flattened beam with 1 cm leaf width MLC on the treatment plan quality in cranio-spinal irradiation (CSI). Methods: For five medulloblastoma cases (3 males and 2 females), who were previously treated by volumetric modulated arc therapy (VMAT) technique using conventional flattened beam shaped by 1 cm width MLC leaves, four test plans were generated and compared against the delivered plan. These retrospective plans consisted of four different combinations of flattened and FFF beams frommore » Elekta’s Agility treatment head with 0.5 cm width MLC leaves. Sparing of organs at risks (OAR) in terms of dose to 5%, 50%, 75% and 90% volumes, mean and maximum dose were evaluated. Results: All plans satisfied the planning objective of covering 95% of PTV by at least 95% of prescription dose. Marginal variation of dose spillage was observed between different VMAT plans at very low dose range (1–5 Gy). Variation in dose statistics for PTVs and OARs were within 1% or 1 Gy. Amongst the five plans, the plan with flattened beam with 1 cm MLC had the highest number of MUs, 2.13 times higher than the plan with Agility MLC with FFF beam that had the least number of MUs. No statistically significant difference (p≥0.05) was observed between the reference plan and the retrospectively generated plans in terms of PTV coverage, cold spot, hot spot and organ at risk doses. Conclusion: In the treatment of CSI cases by VMAT technique, FFF beams and/or finer width MLC did not exhibit advantage over the flattened beams or wider MLC in terms of plan quality except for reduction in MUs.« less

  20. Analysis the Purposes of Land Use Planning on the Hard Coal Tailing Dumps

    NASA Astrophysics Data System (ADS)

    Zástĕrová, Petra; Niemiec, Dominik; Marschalko, Marian; Durd'ák, Jan; Duraj, Miloš; Yilmaz, Işik; Drusa, Marian

    2016-10-01

    The aim of this publication is to analyse the purposes of land use planning on hard coal tailing dumps. This issue is very topical because there are 46 tailing dumps and 281 reservoirs in the Ostrava-Karvina Mining District. They significantly affect the landscape of this region. A major problem is solving problems of reclamation of these geological environment. This means that it is necessary to think about it and start to solve it. It is clear that such reclamation is not simple both economic as well as environmental point of view. It is necessary to think carefully about what purpose would be tailing dump or reservoirs to utilize in a given location.

  1. 75 FR 59180 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control Technique...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... Promulgation of Air Quality Implementation Plans; Maryland; Control Technique Guidelines for Paper, Film, and... Technique Guidelines (CTG) for paper, film, and foil coatings. These amendments will reduce volatile organic... Promulgation of Air Quality Implementation Plans; Maryland; Control Technique Guidelines for Paper, Film, and...

  2. Impact of spot size on plan quality of spot scanning proton radiosurgery for peripheral brain lesions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Dongxu, E-mail: dongxu-wang@uiowa.edu; Dirksen, Blake; Hyer, Daniel E.

    Purpose: To determine the plan quality of proton spot scanning (SS) radiosurgery as a function of spot size (in-air sigma) in comparison to x-ray radiosurgery for treating peripheral brain lesions. Methods: Single-field optimized (SFO) proton SS plans with sigma ranging from 1 to 8 mm, cone-based x-ray radiosurgery (Cone), and x-ray volumetric modulated arc therapy (VMAT) plans were generated for 11 patients. Plans were evaluated using secondary cancer risk and brain necrosis normal tissue complication probability (NTCP). Results: For all patients, secondary cancer is a negligible risk compared to brain necrosis NTCP. Secondary cancer risk was lower in proton SSmore » plans than in photon plans regardless of spot size (p = 0.001). Brain necrosis NTCP increased monotonically from an average of 2.34/100 (range 0.42/100–4.49/100) to 6.05/100 (range 1.38/100–11.6/100) as sigma increased from 1 to 8 mm, compared to the average of 6.01/100 (range 0.82/100–11.5/100) for Cone and 5.22/100 (range 1.37/100–8.00/100) for VMAT. An in-air sigma less than 4.3 mm was required for proton SS plans to reduce NTCP over photon techniques for the cohort of patients studied with statistical significance (p = 0.0186). Proton SS plans with in-air sigma larger than 7.1 mm had significantly greater brain necrosis NTCP than photon techniques (p = 0.0322). Conclusions: For treating peripheral brain lesions—where proton therapy would be expected to have the greatest depth-dose advantage over photon therapy—the lateral penumbra strongly impacts the SS plan quality relative to photon techniques: proton beamlet sigma at patient surface must be small (<7.1 mm for three-beam single-field optimized SS plans) in order to achieve comparable or smaller brain necrosis NTCP relative to photon radiosurgery techniques. Achieving such small in-air sigma values at low energy (<70 MeV) is a major technological challenge in commercially available proton therapy systems.« less

  3. SU-D-BRB-02: Patient-Specific Rectal Toxicity Predictor Based Plan Quality Control for Prostate Stereotactic Body Radiation Therapy (SBRT)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Song, T; Zhou, L; Li, Y

    2015-06-15

    Purpose: To develop a patient-specific rectal toxicity predictor guided plan quality control tool for prostate SBRT plans. Methods: For prostate SBRT cases, four segments of rectal walls including peri-prostatic anterior rectal wall, peri-prostatic lateral rectal walls, peri-prostatic posterior rectal wall and rectum superior to prostate are identified as organs at risk and the circumference of rectal wall receiving more than 39 Gy (CRW39) and 24 Gy (CRW24) are rectal toxicity predictors. In this new geometry-dosimetry model, a patient geometry descriptor, differential circumference of rectal wall (dCRW) is used as model input geometry parameters and plan dosimetric endpoints CRW39 and CRW24more » are output dosimetric parameters. Linear models are built to correlate dCRW to both CRW39 and CRW24 and established with both a linear regression method and a modified bagging ensemble machine learning method. 27 SBRT prostate cases are retrospectively studied from a dose-escalated clinical trial research. 20 prescribed 50 Gy SBRT cases are recruited to train the model and the other rescaled 7 cases are used to evaluated model feasibility and accuracy. Results: Each solved linear coefficient sequence related to CRW39 or CRW24 is a one-dimensional decreasing function of the distance from the PTV boundary, indicating that the different locations of each rectal circumference have different contributions to each particular dosimetric endpoint. The fitting errors for those trained 20 prostate SBRT cases are small with mean values of 2.39%, 2.45% relative to the endpoint values for SBRT rectal toxicity predictor CRW39 and CRW24 respectively. 1 out of 7 evaluation plans is identified as poor quality plan. After re-planning, the CRW39 and CRW24 can be reduced by 3.34% and 3%, without sacrificing PTV coverage. Conclusion: The proposed patient geometry-plan toxicity predictor model for SBRT plans can be successfully applied to plan quality control for prostate SBRT cases.« less

  4. The Effect of Teacher Training on the Knowledge of Positive Behavior Support and the Quality of Behavior Intervention Plans: A Preliminary Study in Taiwan

    ERIC Educational Resources Information Center

    Wu, Pei-Fang

    2017-01-01

    The purpose of this study was to investigate whether through a series of teacher training. The participants could acquire better knowledge on Positive Behavior Support (PBS), and develop high quality behavior intervention plans. Thirty-six teachers from three public schools participated in the study. The competency-based training consisted of 12…

  5. SU-D-BRB-04: Plan Quality Comparison of Intracranial Stereotactic Radiosurgery (SRS) for Gamma Knife and VMAT Treatments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keeling, V; Algan, O; Ahmad, S

    2015-06-15

    Purpose: To compare treatment plan quality of intracranial stereotactic radiosurgery (SRS) for VMAT (RapidArc) and Gamma Knife (GK) systems. Methods: Ten patients with 24 tumors (seven with 1–2 and three with 4–6 lesions), previously treated with GK 4C (prescription doses ranging from 14–23 Gy) were re-planned for RapidArc. Identical contour sets were kept on MRI images for both plans with tissues assigned a CT number of zero. RapidArc plans were performed using 6 MV flattening-filter-free (FFF) beams with dose rate of 1400 MU/minute using two to eight arcs with the following combinations: 2 full coplanar arcs and the rest non-coplanarmore » half arcs. Beam selection was based on target depth. Areas that penetrated more than 10 cm of tissue were avoided by creating smaller arcs or using avoidance sectors in optimization. Plans were optimized with jaw tracking and a high weighting to the normal-brain-tissue and Normal-Tissue-Objective without compromising PTV coverage. Plans were calculated on a 1 mm grid size using AAA algorithm and then normalized so that 99% of each target volume received the prescription dose. Plan quality was assessed by target coverage using Paddick Conformity Index (PCI), sparing of normal-brain-tissue through analysis of V4, V8, and V12 Gy, and integral dose. Results: In all cases critical structure dose criteria were met. RapidArc had a higher PCI than GK plans for 23 out of 24 lesions. The average PCI was 0.76±0.21 for RapidArc and 0.46±0.20 for GK plans (p≤0.001), respectively. Integral dose and normal-brain-tissue doses for all criteria were lower for RapidArc in nearly all patients. The average ratio of GK to RapidArc plans was 1.28±0.27 (p=0.018), 1.31±0.25 (p=0.017), 1.81±0.43 (p=0.005), and 1.50±0.61 (p=0.006) for V4, V8, and V12 Gy, and integral dose, respectively. Conclusion: VMAT was capable of producing higher quality treatment plans than GK when using optimal beam geometries and proper optimization techniques.« less

  6. Addendum to Air Quality: Decision Support Tools, Partner Plans, Working Groups, Committees

    NASA Technical Reports Server (NTRS)

    Holekamp, Kara; Frisbie, Troy; Estep, Lee

    2005-01-01

    In the original report dated February 11, 2005, the utility of NASA Earth science data in the air quality activities of other agencies and organizations was assessed by reviewing strategic and mission plans and by conducting personal interviews with agency experts to identify and investigate agencies with the potential for partnership with NASA. The overarching agency strategic plans were reviewed and commonalities such as the desire for partnerships and technology development were noted. This addendum to the original report contains such information about the Tennessee Valley Authority and will be inserted as Section 2.6 of "Air Quality: Decision Support Tools, Partner Plans, Working Groups, Committees."

  7. Addendum to Air Quality: Decision Support Tools, Partner Plans, Working Groups, Committees

    NASA Technical Reports Server (NTRS)

    Holekamp, Kara; Frisbie, Troy; Estep, Lee

    2005-01-01

    In the original report dated February 11, 2005, the utility of the NASA Earth science data in the air quality activities of other agencies and organizations was assessed by reviewing strategic and mission plans and by conducting personal interviews with agency experts to identify and investigate agencies with the potential for partnership with NASA. The overarching agency strategic plans were reviewed and commonalities such as the desire for partnerships and technology development were noted. The addendum to the original report contains such information about the Tennessee Valley Authority and will be inserted in Section 2.6 of "Air Quality Decision Support Tools, Partner Plans, Working Groups, Committees".

  8. Factors affecting strategic plan implementation using interpretive structural modeling (ISM).

    PubMed

    Bahadori, Mohammadkarim; Teymourzadeh, Ehsan; Tajik, Hamidreza; Ravangard, Ramin; Raadabadi, Mehdi; Hosseini, Seyed Mojtaba

    2018-06-11

    Purpose Strategic planning is the best tool for managers seeking an informed presence and participation in the market without surrendering to changes. Strategic planning enables managers to achieve their organizational goals and objectives. Hospital goals, such as improving service quality and increasing patient satisfaction cannot be achieved if agreed strategies are not implemented. The purpose of this paper is to investigate the factors affecting strategic plan implementation in one teaching hospital using interpretive structural modeling (ISM). Design/methodology/approach The authors used a descriptive study involving experts and senior managers; 16 were selected as the study sample using a purposive sampling method. Data were collected using a questionnaire designed and prepared based on previous studies. Data were analyzed using ISM. Findings Five main factors affected strategic plan implementation. Although all five variables and factors are top level, "senior manager awareness and participation in the strategic planning process" and "creating and maintaining team participation in the strategic planning process" had maximum drive power. "Organizational structure effects on the strategic planning process" and "Organizational culture effects on the strategic planning process" had maximum dependence power. Practical implications Identifying factors affecting strategic plan implementation is a basis for healthcare quality improvement by analyzing the relationship among factors and overcoming the barriers. Originality/value The authors used ISM to analyze the relationship between factors affecting strategic plan implementation.

  9. Individualized Quality Control Plan (IQCP): Is It Value-Added for Clinical Microbiology?

    PubMed

    Sharp, Susan E; Miller, Melissa B; Hindler, Janet

    2015-12-01

    The Center for Medicaid and Medicare Services (CMS) recently published their Individualized Quality Control Plan (IQCP [https://www.cms.gov/regulations-and-guidance/legislation/CLIA/Individualized_Quality_Control_Plan_IQCP.html]), which will be the only option for quality control (QC) starting in January 2016 if laboratories choose not to perform Clinical Laboratory Improvement Act (CLIA) [U.S. Statutes at Large 81(1967):533] default QC. Laboratories will no longer be able to use "equivalent QC" (EQC) or the Clinical and Laboratory Standards Institute (CLSI) standards alone for quality control of their microbiology systems. The implementation of IQCP in clinical microbiology laboratories will most certainly be an added burden, the benefits of which are currently unknown. Copyright © 2015, American Society for Microbiology. All Rights Reserved.

  10. Surface-Water Quality-Assurance Plan for the Tallahassee Office, U.S. Geological Survey

    USGS Publications Warehouse

    Tomlinson, Stewart A.

    2006-01-01

    This Tallahassee Office Surface-Water Quality-Assurance Plan documents the standards, policies, and procedures used by the Tallahassee Office for activities related to the collection, processing, storage, analysis, and publication of surface-water data. This plan serves as a guide to all Tallahassee Office personnel involved in surface-water data activities, and changes as the needs and requirements of the Tallahassee Office, Florida Integrated Science Center, and Water Discipline change. Reg-ular updates to this Plan represent an integral part of the quality-assurance process. In the Tallahassee Office, direct oversight and responsibility by the employee(s) assigned to a surface-water station, combined with team approaches in all work efforts, assure high-quality data, analyses, reviews, and reports for cooperating agencies and the public.

  11. The Quest for Quality 1964. A Report on School Planning Laboratory Efforts to Encourage Better Planning for Better Schools in 1964.

    ERIC Educational Resources Information Center

    MacConnell, James D.

    The Fourth Annual Report from the School Planning Laboratory discusses the quest for quality and explains how better schools have been planned at the Center through--(1) systems construction, (2) an airborne institute, (3) school planning education, (4) service to visitors, (5) community college planning, (6) direct assistance, and (7) continued…

  12. 76 FR 55621 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-08

    ... California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY: Environmental...-Solano Air Quality Management District portion of the California State Implementation Plan (SIP). This... the following local rule: Yolo-Solano Air Quality Management District Rule 2.41, Expandable...

  13. 75 FR 25778 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... approve revisions to the Yolo-Solano Air Quality Management District (YSAQMD) portion of the California... Identification of plan. * * * * * (c) * * * (377) * * * (i) * * * (B) Yolo Solano Air Quality Management District...

  14. 76 FR 30896 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... overwhelmingly formed as a secondary pollutant. (South Coast 2007 Air Quality Management Plan, page ES-9...

  15. 78 FR 76064 - Approval and Promulgation of Air Quality Implementation Plans; Michigan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-16

    ...] Approval and Promulgation of Air Quality Implementation Plans; Michigan AGENCY: Environmental Protection... nonattainment air quality permitting regulations found in 40 CFR 51.165(a) and (b). EPA has found that the rules... progress toward achieving the National Ambient Air Quality Standards. II. Statutory and Executive Order...

  16. 75 FR 11461 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... Promulgation of Air Quality Implementation Plans; Minnesota AGENCY: Environmental Protection Agency (EPA.... Because the PM 10 emission limits are being reduced, the air quality of Ramsey County will be protected... culpable source in the Childs Road area's nonattainment of the PM 10 National Ambient Air Quality Standards...

  17. Automation and intensity modulated radiation therapy for individualized high-quality tangent breast treatment plans.

    PubMed

    Purdie, Thomas G; Dinniwell, Robert E; Fyles, Anthony; Sharpe, Michael B

    2014-11-01

    To demonstrate the large-scale clinical implementation and performance of an automated treatment planning methodology for tangential breast intensity modulated radiation therapy (IMRT). Automated planning was used to prospectively plan tangential breast IMRT treatment for 1661 patients between June 2009 and November 2012. The automated planning method emulates the manual steps performed by the user during treatment planning, including anatomical segmentation, beam placement, optimization, dose calculation, and plan documentation. The user specifies clinical requirements of the plan to be generated through a user interface embedded in the planning system. The automated method uses heuristic algorithms to define and simplify the technical aspects of the treatment planning process. Automated planning was used in 1661 of 1708 patients receiving tangential breast IMRT during the time interval studied. Therefore, automated planning was applicable in greater than 97% of cases. The time for treatment planning using the automated process is routinely 5 to 6 minutes on standard commercially available planning hardware. We have shown a consistent reduction in plan rejections from plan reviews through the standard quality control process or weekly quality review multidisciplinary breast rounds as we have automated the planning process for tangential breast IMRT. Clinical plan acceptance increased from 97.3% using our previous semiautomated inverse method to 98.9% using the fully automated method. Automation has become the routine standard method for treatment planning of tangential breast IMRT at our institution and is clinically feasible on a large scale. The method has wide clinical applicability and can add tremendous efficiency, standardization, and quality to the current treatment planning process. The use of automated methods can allow centers to more rapidly adopt IMRT and enhance access to the documented improvements in care for breast cancer patients, using

  18. 76 FR 69927 - Approval of Air Quality Implementation Plans; California; South Coast; Attainment Plan for 1997...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-09

    ...EPA is approving in part and disapproving in part state implementation plan (SIP) revisions submitted by California to provide for attainment of the 1997 fine particulate matter (PM2.5) national ambient air quality standards in the Los Angeles-South Coast area (South Coast). These SIP revisions are the South Coast 2007 Air Quality Management Plan (South Coast 2007 AQMP) (revised 2011) and South Coast-related provisions of the 2007 State Strategy (revised 2009 and 2011). EPA is approving the emissions inventory; reasonably available control measures/reasonably available control technology demonstration; the reasonable further progress and attainment demonstrations and associated air quality modeling; and the transportation conformity motor vehicle emissions budgets. EPA is also granting California's request to extend the attainment deadline for the South Coast to April 5, 2015 and approving commitments to measures and reductions by the South Coast Air Quality Management District and the California Air Resources Board. Finally, we are disapproving the SIP's contingency measures and issuing a protective finding under 40 CFR 93.120(a)(3), and we are rejecting the assignment of 10 tons per day (tpd) of nitrogen oxide (NOX) reductions to the federal government.

  19. 40 CFR 267.51 - What is the purpose of the contingency plan and how do I use it?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false What is the purpose of the contingency plan and how do I use it? 267.51 Section 267.51 Protection of Environment ENVIRONMENTAL PROTECTION... facility. You must design the plan to minimize hazards to human health or the environment from fires...

  20. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... the California State Implementation Plan; South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the...

  1. Training and Learning as Drivers of US Microenterprise Business Plan Quality

    ERIC Educational Resources Information Center

    Cook, Ronald G.; Belliveau, Paul; Sandberg, Mark E.

    2004-01-01

    This study examined the output quality of a US microenterprise training program created to help entrepreneurs develop business plans for their ventures. The program concludes with the entrepreneurs' plans being scored by a panel of experts. Hypotheses were developed and tested to determine the importance of feedback, key components of business…

  2. SU-F-T-272: Patient Specific Quality Assurance of Prostate VMAT Plans with Portal Dosimetry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Darko, J; Osei, E; University of Waterloo, Waterloo, ON

    Purpose: To evaluate the effectiveness of using the Portal Dosimetry (PD) method for patient specific quality assurance of prostate VMAT plans. Methods: As per institutional protocol all VMAT plans were measured using the Varian Portal Dosimetry (PD) method. A gamma evaluation criterion of 3%-3mm with a minimum area gamma pass rate (gamma <1) of 95% is used clinically for all plans. We retrospectively evaluated the portal dosimetry results for 170 prostate patients treated with VMAT technique. Three sets of criterions were adopted for re-evaluating the measurements; 3%-3mm, 2%-2mm and 1%-1mm. For all criterions two areas, Field+1cm and MLC-CIAO were analysed.Tomore » ascertain the effectiveness of the portal dosimetry technique in determining the delivery accuracy of prostate VMAT plans, 10 patients previously measured with portal dosimetry, were randomly selected and their measurements repeated using the ArcCHECK method. The same criterion used in the analysis of PD was used for the ArcCHECK measurements. Results: All patient plans reviewed met the institutional criteria for Area Gamma pass rate. Overall, the gamma pass rate (gamma <1) decreases for 3%-3mm, 2%-2mm and 1%-1mm criterion. For each criterion the pass rate was significantly reduced when the MLC-CIAO was used instead of FIELD+1cm. There was noticeable change in sensitivity for MLC-CIAO with 2%-2mm criteria and much more significant reduction at 1%-1mm. Comparable results were obtained for the ArcCHECK measurements. Although differences were observed between the clockwise verses the counter clockwise plans in both the PD and ArcCHECK measurements, this was not deemed to be statistically significant. Conclusion: This work demonstrates that Portal Dosimetry technique can be effectively used for quality assurance of VMAT plans. Results obtained show similar sensitivity compared to ArcCheck. To reveal certain delivery inaccuracies, the use of a combination of criterions may provide an effective way in

  3. 78 FR 34903 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; 1997 8-Hour Ozone...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Promulgation of Air Quality Implementation Plans; Ohio; 1997 8-Hour Ozone Maintenance Plan Revision; Motor... request by Ohio to revise the 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) to... area with budgets developed using EPA's Motor Vehicle Emissions Simulator (MOVES) emissions model. Ohio...

  4. 78 FR 16826 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Cleveland-Akron-Lorain and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-19

    ...-9790-1] Approval and Promulgation of Air Quality Implementation Plans; Ohio; Cleveland-Akron-Lorain and Columbus 1997 8-Hour Ozone Maintenance Plan Revisions to Approved Motor Vehicle Emissions Budgets AGENCY... quality State Implementation Plans (SIPs) under the Clean Air Act to replace the previously approved motor...

  5. 77 FR 26950 - Designation of Areas for Air Quality Planning Purposes; California; Western Mojave Desert Ozone...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-08

    ... CONTACT section. FOR FURTHER INFORMATION CONTACT: Doris Lo, Air Planning Office (AIR-2), U.S. Environmental Protection Agency, Region IX, (415) 972-3959, lo[email protected] . SUPPLEMENTARY INFORMATION...

  6. Using the Theory of Planned Behaviour (TPB) in Predicting the Intent to Use the Internet for Academic Purposes

    ERIC Educational Resources Information Center

    Bidin, Zainol; Hashim, Mohd Farid Asraf Md; Sharif, Zakiyah; Shamsudin, Faridahwati Mohd

    2011-01-01

    Purpose: This study sought to investigate the factors that influence students' intention to use the Internet for academic purposes in Universiti Utara Malaysia. This study applies theory of planned behaviour (TPB) as the base model. The model employed the original variables from the theory i.e. attitudes, subjective norms, perceived behavioural…

  7. AutoLock: a semiautomated system for radiotherapy treatment plan quality control.

    PubMed

    Dewhurst, Joseph M; Lowe, Matthew; Hardy, Mark J; Boylan, Christopher J; Whitehurst, Philip; Rowbottom, Carl G

    2015-05-08

    A semiautomated system for radiotherapy treatment plan quality control (QC), named AutoLock, is presented. AutoLock is designed to augment treatment plan QC by automatically checking aspects of treatment plans that are well suited to computational evaluation, whilst summarizing more subjective aspects in the form of a checklist. The treatment plan must pass all automated checks and all checklist items must be acknowledged by the planner as correct before the plan is finalized. Thus AutoLock uniquely integrates automated treatment plan QC, an electronic checklist, and plan finalization. In addition to reducing the potential for the propagation of errors, the integration of AutoLock into the plan finalization workflow has improved efficiency at our center. Detailed audit data are presented, demonstrating that the treatment plan QC rejection rate fell by around a third following the clinical introduction of AutoLock.

  8. NHEXAS PHASE I MARYLAND STUDY--QUALITY SYSTEMS AND IMPLEMENTATION PLAN (HSPH QSIP)

    EPA Science Inventory

    This document describes the project design and quality systems used by the Maryland Study for NHEXAS Phase 1. It contains the following sections: Project Planning and Organization, Project Implementation Plan, Data Acquisition and Management, Records Usage and Management, Routin...

  9. Quality-assurance plan for the analysis of suspended sediment by the U.S. Geological Survey in Montana

    USGS Publications Warehouse

    Dodge, Kent A.; Lambing, John H.

    2006-01-01

    A quality-assurance plan has been developed for use by the sediment laboratory of the U.S. Geological Survey Montana Water Science Center in conducting activities related to the analysis of suspended sediment. The plan documents quality-assurance policies for sediment-laboratory certification, personnel responsibilities and training, documentation requirements, and laboratory safety. The plan also documents quality-assurance procedures related to laboratory equipment and supplies, sample management, sample analysis, analytical quality control, and data management.

  10. Can high quality overcome consumer resistance to restricted provider access? Evidence from a health plan choice experiment.

    PubMed

    Harris, Katherine M

    2002-06-01

    To investigate the impact of quality information on the willingness of consumers to enroll in health plans that restrict provider access. A survey administered to respondents between the ages of 25 and 64 in the West Los Angeles area with private health insurance. An experimental approach is used to measure the effect of variation in provider network features and information about the quality of network physicians on hypothetical plan choices. Conditional logit models are used to analyze the experimental choice data. Next, choice model parameter estimates are used to simulate the impact of changes in plan features on the market shares of competing health plans and to calculate the quality level required to make consumers indifferent to changes in provider access. The presence of quality information reduced the importance of provider network features in plan choices as hypothesized. However, there were not statistically meaningful differences by type of quality measure (i.e., consumer assessed versus expert assessed). The results imply that large quality differences are required to make consumers indifferent to changes in provider access. The impact of quality on plan choices depended more on the particular measure and less on the type of measure. Quality ratings based on the proportion of survey respondents "extremely satisfied with results of care" had the greatest impact on plan choice while the proportion of network doctors "affiliated with university medical centers" had the least. Other consumer and expert assessed measures had more comparable effects. Overall the results provide empirical evidence that consumers are willing to trade high quality for restrictions on provider access. This willingness to trade implies that relatively small plans that place restrictions on provider access can successfully compete against less restrictive plans when they can demonstrate high quality. However, the results of this study suggest that in many cases, the level of

  11. Can High Quality Overcome Consumer Resistance to Restricted Provider Access? Evidence from a Health Plan Choice Experiment

    PubMed Central

    Harris, Katherine M

    2002-01-01

    Objective To investigate the impact of quality information on the willingness of consumers to enroll in health plans that restrict provider access. Data Sources and Setting A survey administered to respondents between the ages of 25 and 64 in the West Los Angeles area with private health insurance. Study Design An experimental approach is used to measure the effect of variation in provider network features and information about the quality of network physicians on hypothetical plan choices. Conditional logit models are used to analyze the experimental choice data. Next, choice model parameter estimates are used to simulate the impact of changes in plan features on the market shares of competing health plans and to calculate the quality level required to make consumers indifferent to changes in provider access. Principal Findings The presence of quality information reduced the importance of provider network features in plan choices as hypothesized. However, there were not statistically meaningful differences by type of quality measure (i.e., consumer assessed versus expert assessed). The results imply that large quality differences are required to make consumers indifferent to changes in provider access. The impact of quality on plan choices depended more on the particular measure and less on the type of measure. Quality ratings based on the proportion of survey respondents “extremely satisfied with results of care” had the greatest impact on plan choice while the proportion of network doctors “affiliated with university medical centers” had the least. Other consumer and expert assessed measures had more comparable effects. Conclusions Overall the results provide empirical evidence that consumers are willing to trade high quality for restrictions on provider access. This willingness to trade implies that relatively small plans that place restrictions on provider access can successfully compete against less restrictive plans when they can demonstrate high

  12. Quality of care in family planning services in Morocco.

    PubMed

    Brown, L; Tyane, M; Bertrand, J; Lauro, D; Abou-ouakil, M; deMaria, L

    1995-01-01

    This study was conducted to heighten awareness of quality of care as a programmatic issue in the Moroccan governmental family planning program and to test modified Situation Analysis instruments for measuring quality of care. Data were collected from 50 service-delivery points in five provinces to measure six elements of quality in accordance with the Bruce/Jain framework. A procedure for calculating quality-indicator scores is presented. Although facilities varied by province and within provinces, most had the equipment and supplies needed to deliver services; service personnel were trained and regularly supervised; the service-delivery points scored well on mechanisms to ensure continuity of use. Notable shortcomings included a dearth of materials for counseling and a widespread unavailability of the Ovrette pill. This study raises issues regarding the complexity of measuring quality, the ownership of results, and the appropriateness of a centralized study of quality in a decentralized program.

  13. MO-B-BRB-02: Maintain the Quality of Treatment Planning for Time-Constraint Cases

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chang, J.

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequentialmore » events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d

  14. SU-F-T-615: Comparison of Plan Quality for Linac-Based Stereotactic Radiosurgery (SRS) Using Single- and Multi-Isocenter Techniques

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chang, J; Dept of Radiation Oncology, NewYork Hospital/Weill Cornell Medical College, New York, NY; Wernicke, A

    2016-06-15

    Purpose: To compare the plan quality of linear accelerator (linac)-based stereotactic radiosurgery (SRS) using single-isocenter volumetric arc therapy (SI-VMAT), restricted single-isocenter dynamic-arc (RSI-DARC), and multi-isocenter DARC (MI-DARC) techniques. Methods: Fifteen SRS cases were randomly selected and re-planned using the SI-VMAT (Pinnacle), RSI-DARC (iPlanNet) and MI-DARC (iPlanNet). The number of planning target volumes (PTVs) for each plan ranged from 1 to 6. For SI-VMAT, a single isocenter and 3-4 VMAT beams are used for all PTVs, while for MI-DARC, each PTV has its own isocetner with 3 DARC beams. RSI-DARC uses one isocnter with 3-6 DARC beams to irradiate all PTVsmore » within 2.5-cm radius. Both SI-DARC and RSI-DARC plans were optimized manually. The prescription dose was 20 Gy to each PTV. The maximal dose was 25 Gy for RSI-DARC and MI-DARC, but could not be controlled for SI-VMAT due to the nature of VMAT planning. Plan quality indexes including PTV coverage, mean dose of PTV (PTVmean) and tissue (Tmean), V12Gy, conformity index (CI), and V10Gy/VPTV were calculated and compared. Results: Full PTV coverage was achieved for all three techniques. Using the MI-DARC plans as the gold standard, the PTVmean of the SI-VMAT plans was 12.5%±8.3% (mean±standard deviation) higher, in comparison to 0.7%±1.4% for the RSI-DARC plans. Similar trend was observed for other indexes including V12Gy (39.4%±27.3% vs. 9.3%±7.8%), Tmean (35.0%±26.8% vs. 2.8%±3.4%), and V10Gy/VPTV (42.2%±31.5% vs. 9.9%±8.2%). CI is comparable (6.2%±14.2% vs. 6.3%±7.2%). Assuming the treatment time is proportional to the number of isocenters, the reduction of the treatment time in comparison to MI-DARC was 70% for SI-VMAT and 42% for RSI-DARC. Conclusion: Although the SI-VMAT can save a considerable amount of treatment time, the plan indexes also significantly deviates from the gold standard, MI-DARC. RSI-DARC, on the other hand, provides a good compromise between the

  15. 78 FR 34965 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; 1997 8-Hour Ozone...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Promulgation of Air Quality Implementation Plans; Ohio; 1997 8-Hour Ozone Maintenance Plan Revision; Motor... request by Ohio to revise the 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP...) emissions model. Ohio submitted the SIP revision request to EPA on December 7, 2012. DATES: Comments must be...

  16. SU-E-T-60: A Plan Quality Index in IMRT QA That Is Independent of the Acceptance Criteria

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kim, D; Kang, S; Kim, T

    2015-06-15

    Purpose: In IMRT QA, plan quality evaluation is made based on pass rate under preset acceptance criteria, mostly using gamma-values. This method is convenient but, its Result highly depends on what the acceptance criteria are and suffers from the lack of sensitivity in judging how good the plan is. In this study, we introduced a simple but effective plan quality index of IMRT QA based on dose difference only to supplement such shortcomings, and investigated its validity. Methods: The proposed index is a single value which is calculated mainly based on point-by-point comparison between planned and measured dose distributions, andmore » it becomes “1” in an ideal case. A systematic evaluation was performed with one-dimensional test dose distributions. For 3 hypothetical dose profiles, various displacements (in both dose and space) were introduced, the proposed index was calculated for each case, and the behavior of obtained indices was analyzed and compared with that of gamma evaluation. In addition, the feasibility of the index was assessed with clinical IMRT/VMAT/SBRT QA cases for different sites (prostate, head & neck, liver, lung, spine, and abdomen). Results: The proposed index showed more robust correlation with the amount of induced displacement compared to the gamma evaluation method. No matter what the acceptance criteria are (e.g., whether 3%/3mm or 2%/2mm), it was possible to clearly rank every case with the proposed index while it was difficult to do with the gamma evaluation method. Conclusion: IMRT plan quality can be evaluated quantitatively by the proposed index. It is considered that the proposed index would provide useful information for better judging the level of goodness of each plan and its Result is independent of the acceptance criteria. This work was supported by the Radiation Technology R&D program (No. 2013M2A2A7043498) and the Mid-career Researcher Program (2014R1A2A1A10050270) through the National Research Foundation of Korea funded

  17. Sunway Medical Laboratory Quality Control Plans Based on Six Sigma, Risk Management and Uncertainty.

    PubMed

    Jairaman, Jamuna; Sakiman, Zarinah; Li, Lee Suan

    2017-03-01

    Sunway Medical Centre (SunMed) implemented Six Sigma, measurement uncertainty, and risk management after the CLSI EP23 Individualized Quality Control Plan approach. Despite the differences in all three approaches, each implementation was beneficial to the laboratory, and none was in conflict with another approach. A synthesis of these approaches, built on a solid foundation of quality control planning, can help build a strong quality management system for the entire laboratory. Copyright © 2016 Elsevier Inc. All rights reserved.

  18. 78 FR 63877 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ...] Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure Requirements for the 2010 Nitrogen Dioxide National Ambient Air Quality Standards AGENCY: Environmental Protection... ambient air quality standard (NAAQS). EPA is approving this SIP revision in accordance with the...

  19. Mission-Related Execution and Planning Through Quality of Service Methods

    DTIC Science & Technology

    2010-06-01

    which maximizes a mission effectiveness functions is the ideal driver of QoS mechanisms. Service Quality Quality of Service may also exist in other...However, service quality is the originating concept of QoS and is the level of performance which one entity expects from another, including non-IT SoSs... Service quality may also be reflected in the context of a system’s purpose or an organization’s mission. Putting level of service values and

  20. Health Workforce Planning

    PubMed Central

    Al-Sawai, Abdulaziz; Al-Shishtawy, Moeness M.

    2015-01-01

    In most countries, the lack of explicit health workforce planning has resulted in imbalances that threaten the capacity of healthcare systems to attain their objectives. This has directed attention towards the prospect of developing healthcare systems that are more responsive to the needs and expectations of the population by providing health planners with a systematic method to effectively manage human resources in this sector. This review analyses various approaches to health workforce planning and presents the Six-Step Methodology to Integrated Workforce Planning which highlights essential elements in workforce planning to ensure the quality of services. The purpose, scope and ownership of the approach is defined. Furthermore, developing an action plan for managing a health workforce is emphasised and a reviewing and monitoring process to guide corrective actions is suggested. PMID:25685381

  1. 78 FR 42482 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-16

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule... Environmental Protection, Bureau of Air Quality Control, P.O. Box 8468, 400 Market Street, Harrisburg...

  2. AutoLock: a semiautomated system for radiotherapy treatment plan quality control

    PubMed Central

    Lowe, Matthew; Hardy, Mark J.; Boylan, Christopher J.; Whitehurst, Philip; Rowbottom, Carl G.

    2015-01-01

    A semiautomated system for radiotherapy treatment plan quality control (QC), named AutoLock, is presented. AutoLock is designed to augment treatment plan QC by automatically checking aspects of treatment plans that are well suited to computational evaluation, whilst summarizing more subjective aspects in the form of a checklist. The treatment plan must pass all automated checks and all checklist items must be acknowledged by the planner as correct before the plan is finalized. Thus AutoLock uniquely integrates automated treatment plan QC, an electronic checklist, and plan finalization. In addition to reducing the potential for the propagation of errors, the integration of AutoLock into the plan finalization workflow has improved efficiency at our center. Detailed audit data are presented, demonstrating that the treatment plan QC rejection rate fell by around a third following the clinical introduction of AutoLock. PACS number: 87.55.Qr PMID:26103498

  3. POSTER FOR NRMRL QUALITY MANAGEMENT PLAN (QMP) TRAINING COURSE

    EPA Science Inventory


    NRMRL QMP Training Course
    Contact: Lauren Drees, NRMRL/STD (drees.lauren@epa.gov)

    NRMRL has developed a computer-based course to train personnel in the requirements of the NRMRL Quality Management Plan (QMP). This training course was developed using Trainersoft s...

  4. Advance Care Planning and the Quality of End-of-Life Care among Older Adults

    PubMed Central

    Bischoff, Kara E.; Sudore, Rebecca; Miao, Yinghui; Boscardin, W. John; Smith, Alexander K.

    2013-01-01

    Background Advance care planning is increasingly common, but whether it influences end-of-life quality of care remains controversial. Design Medicare data and survey data from the Health and Retirement Study were combined to determine whether advance care planning was associated with quality metrics. Setting The nationally representative Health and Retirement Study. Participants 4394 decedent subjects (mean age 82.6 years at death, 55% women). Measurements Advance care planning was defined as having an advance directive, durable power of attorney or having discussed preferences for end-of-life care with a next-of-kin. Outcomes included previously reported quality metrics observed during the last month of life (rates of hospital admission, in-hospital death, >14 days in the hospital, intensive care unit admission, >1 emergency department visit, hospice admission, and length of hospice ≤3 days). Results Seventy-six percent of subjects engaged in advance care planning. Ninety-two percent of advance directives stated a preference to prioritize comfort. After adjustment, subjects who engaged in advance care planning were less likely to die in a hospital (adjusted RR 0.87, 95% CI 0.80-0.94), more likely to be enrolled in hospice (aRR 1.68, 1.43-1.97), and less likely to receive hospice for ≤3 days before death (aRR 0.88, 0.85-0.91). Having an advance directive, a durable-power-of-attorney or an advance care planning discussion were each independently associated with a significant increase in hospice use (p<0.01 for all). Conclusion Advance care planning was associated with improved quality of care at the end of life, including less in-hospital death and increased use of hospice. Having an advance directive, assigning a durable power of attorney and conducting advance care planning discussions are all important elements of advance care planning. PMID:23350921

  5. 49 CFR 272.1 - Purpose.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... TRANSPORTATION CRITICAL INCIDENT STRESS PLANS General § 272.1 Purpose. (a) The purpose of this part is to promote... critical incident stress plan that contains additional provisions beyond those specified in this part...

  6. 75 FR 25775 - Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2009-0573; FRL-9146-5] Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District AGENCY: Environmental... South Coast Air Quality Management District (SCAQMD) portion of the California State Implementation Plan...

  7. 78 FR 28173 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Sulfur Dioxide and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-14

    ...-9811-5] Approval and Promulgation of Air Quality Implementation Plans; Indiana; Sulfur Dioxide and Nitrogen Dioxide Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA). ACTION... implementation plan (SIP) for nitrogen dioxide (NO 2 ) and sulfur dioxide (SO 2 ) under the Clean Air Act. This...

  8. 75 FR 40726 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION... Metropolitan Air Quality Management District (SMAQMD) and South Coast Air Quality Management District (SCAQMD...

  9. Quality-assurance plan for water-resources activities of the U.S. Geological Survey in Idaho

    USGS Publications Warehouse

    Packard, F.A.

    1996-01-01

    To ensure continued confidence in its products, the Water Resources Division of the U.S. Geological Survey implemented a policy that all its scientific work be performed in accordance with a centrally managed quality-assurance program. This report establishes and documents a formal policy for current (1995) quality assurance within the Idaho District of the U.S. Geological Survey. Quality assurance is formalized by describing district organization and operational responsibilities, documenting the district quality-assurance policies, and describing district functions. The districts conducts its work through offices in Boise, Idaho Falls, Twin Falls, Sandpoint, and at the Idaho National Engineering Laboratory. Data-collection programs and interpretive studies are conducted by two operating units, and operational and technical assistance is provided by three support units: (1) Administrative Services advisors provide guidance on various personnel issues and budget functions, (2) computer and reports advisors provide guidance in their fields, and (3) discipline specialists provide technical advice and assistance to the district and to chiefs of various projects. The district's quality-assurance plan is based on an overall policy that provides a framework for defining the precision and accuracy of collected data. The plan is supported by a series of quality-assurance policy statements that describe responsibilities for specific operations in the district's program. The operations are program planning; project planning; project implementation; review and remediation; data collection; equipment calibration and maintenance; data processing and storage; data analysis, synthesis, and interpretation; report preparation and processing; and training. Activities of the district are systematically conducted under a hierarchy of supervision an management that is designed to ensure conformance with Water Resources Division goals quality assurance. The district quality

  10. 78 FR 50369 - Approval and Promulgation of Air Quality Implementation Plans; Michigan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-19

    ...] Approval and Promulgation of Air Quality Implementation Plans; Michigan AGENCY: Environmental Protection... the State of Michigan's Clean Air Act State Implementation Plan (SIP) that Michigan had submitted on March 24, 2009. Michigan's submittal included revisions to Part 1, Definitions; Part 2, Air Use Approval...

  11. Strategy and Quality Maps in Higher Education

    ERIC Educational Resources Information Center

    Kettunen, Juha

    2011-01-01

    The purpose of this study is to investigate the integration of strategic management and quality assurance in higher education. The study presents how the value chain can be described in the strategy and quality maps, which are, respectively graphical representations of the strategic plan and the quality assurance system. The quality map is a new…

  12. 40 CFR 35.160 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... also be eligible for funding under sections 104(b)(3) (Water Quality Cooperative Agreements and Wetlands Development Grants), 205(j)(2) (Water Quality Management Planning), and section 205(g) (State...) Associated program requirements. Program requirements for water quality planning and management activities...

  13. 76 FR 54384 - California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0537; FRL-9457-6] California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of Direct Final Rule... Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District (SCAQMD) Rule 1143...

  14. 78 FR 54813 - Approval and Promulgation of Air Quality Implementation Plans; Maine; Oxides of Nitrogen...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Parts 52 [EPA-R01-OAR-2012-0895; FRL- 9900-85-Region1] Approval and Promulgation of Air Quality Implementation Plans; Maine; Oxides of Nitrogen Exemption and... proposed Approval and Promulgation of Air Quality Implementation Plans; Maine; Oxides of Nitrogen Exemption...

  15. Partnerships for Quality: A Statewide Plan for Developing and Implementing a Total Quality Curriculum Delivered through Oregon's Community Colleges.

    ERIC Educational Resources Information Center

    Oregon State Economic Development Dept., Salem.

    The Oregon Advanced Technology Consortium (OATC) created the Partnerships for Quality Project (PQP) to improve Oregon's community colleges by developing a total quality curriculum (TQC) based on the beliefs and practices of total quality management (TQM). This report summarizes the recommendations of the PQP and presents a plan of action for the…

  16. SU-G-201-01: An Automated Treatment Plan Quality Assurance Program for High-Dose Rate (HDR) Brachytherapy with a VaginalCylinder Applicator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhou, Y; Tan, J; Jiang, S

    Purpose: Plan specific quality assurance (QA) is an important step in high dose rate (HDR) brachytherapy to ensure the integrity of a treatment plan. The conventional approach is to assemble a set of plan screen-captures in a document and have an independent plan-checker to verify it. Not only is this approach cumbersome and time-consuming, using a document also limits the items that can be verified, hindering plan quality and patient safety. We have initiated efforts to develop a web-based HDR brachytherapy QA system called AutoBrachy QA, for comprehensive and efficient QA. This abstract reports a new plugin in this systemmore » for the QA of a cylinder HDR brachytherapy treatment. Methods: A cylinder plan QA module was developed using Python. It was plugged into our AutoBrachy QA system. This module extracted information from CT images and treatment plan. Image processing techniques were employed to obtain geometric parameters, e.g. cylinder diameter. A comprehensive set of eight geometrical and eight dosimetric features of the plan were validated against user specified planning parameter, such as prescription value, treatment depth and length, etc. A PDF document was generated, consisting of a summary QA sheet with all the QA results, as well as images showing plan details. Results: The cylinder QA program has been implemented in our clinic. To date, it has been used in 11 patient cases and was able to successfully perform QA tests in all of them. The QA program reduced the average plan QA time from 7 min using conventional manual approach to 0.5 min. Conclusion: Being a new module in our AutoBrachy QA system, an automated treatment plan QA module for cylinder HDR brachytherapy has been successfully developed and clinically implemented. This module improved clinical workflow and plan integrity compared to the conventional manual approach.« less

  17. Care Planning, Quality Assurance, and Personnel Management in Long-Term Care Facilities. Final Report.

    ERIC Educational Resources Information Center

    Patchner, Michael A.; Balgopal, Pallassana R.

    Three studies were undertaken to examine topics of care planning, personnel management, and quality assurance in long-term care facilities. The first study examined the formulation and implementation processes of care planning for nursing home residents. The exemplary homes' care planning included the existence of strong care planning leadership,…

  18. 78 FR 28497 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Canton-Massillon 1997 8-Hour...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-15

    ... Promulgation of Air Quality Implementation Plans; Ohio; Canton-Massillon 1997 8-Hour Ozone Maintenance Plan... the Canton-Massillon, Ohio 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP... using EPA's Motor Vehicle Emissions Simulator (MOVES) emissions model. Ohio submitted the SIP revision...

  19. 75 FR 11503 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... Promulgation of Air Quality Implementation Plans; Minnesota AGENCY: Environmental Protection Agency (EPA... PM 10 emission limits are being reduced, the air quality of Ramsey County will be protected. DATES...: (312) 385-5501. 4. Mail: Genevieve Damico, Acting Chief, Criteria Pollutant Section, Air Programs...

  20. 77 FR 48061 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State Implementation Plan...'s limited approval of Pennsylvania's Regional Haze State Implementation Plan (SIP). DATES: Effective... announcing our limited approval of Pennsylvania's Regional Haze SIP. In this document, we inadvertently...

  1. SU-F-T-564: 3 Year Experience of Treatment Plan QualityAssurance for Vero SBRT Patients

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Su, Z; Li, Z; Mamalui, M

    2016-06-15

    Purpose: To verify treatment plan monitor units from iPlan treatment planning system for Vero Stereotactic Body Radiotherapy (SBRT) treatment using both software-based and (homogeneous and heterogeneous) phantom-based approaches. Methods: Dynamic conformal arcs (DCA) were used for SBRT treatment of oligometastasis patients using Vero linear accelerator. For each plan, Monte Carlo calculated treatment plans MU (prescribed dose to water with 1% variance) is verified first by RadCalc software with 3% difference threshold. Beyond 3% differences, treatment plans were copied onto (homogeneous) Scanditronix phantom for non-lung patients and copied onto (heterogeneous) CIRS phantom for lung patients and the corresponding plan dose wasmore » measured using a cc01 ion chamber. The difference between the planed and measured dose was recorded. For the past 3 years, we have treated 180 patients with 315 targets. Out of these patients, 99 targets treatment plan RadCalc calculation exceeded 3% threshold and phantom based measurements were performed with 26 plans using Scanditronix phantom and 73 plans using CIRS phantom. Mean and standard deviation of the dose differences were obtained and presented. Results: For all patient RadCalc calculations, the mean dose difference is 0.76% with a standard deviation of 5.97%. For non-lung patient plan Scanditronix phantom measurements, the mean dose difference is 0.54% with standard deviation of 2.53%; for lung patient plan CIRS phantom measurements, the mean dose difference is −0.04% with a standard deviation of 1.09%; The maximum dose difference is 3.47% for Scanditronix phantom measurements and 3.08% for CIRS phantom measurements. Conclusion: Limitations in secondary MU check software lead to perceived large dose discrepancies for some of the lung patient SBRT treatment plans. Homogeneous and heterogeneous phantoms were used in plan quality assurance for non-lung patients and lung patients, respectively. Phantom based QA showed the

  2. 34 CFR 200.57 - Plans to increase teacher quality.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Plans to increase teacher quality. 200.57 Section 200.57 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND SECONDARY EDUCATION, DEPARTMENT OF EDUCATION TITLE I-IMPROVING THE ACADEMIC ACHIEVEMENT OF THE DISADVANTAGED...

  3. 34 CFR 200.57 - Plans to increase teacher quality.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 1 2011-07-01 2011-07-01 false Plans to increase teacher quality. 200.57 Section 200.57 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND SECONDARY EDUCATION, DEPARTMENT OF EDUCATION TITLE I-IMPROVING THE ACADEMIC ACHIEVEMENT OF THE DISADVANTAGED...

  4. 78 FR 28551 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Canton-Massillon 1997 8-Hour...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-15

    ... Promulgation of Air Quality Implementation Plans; Ohio; Canton-Massillon 1997 8-Hour Ozone Maintenance Plan..., Ohio, 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) under the Clean Air Act... Motor Vehicle Emissions Simulator (MOVES) emissions model. Ohio submitted the SIP revision request to...

  5. A Preliminary Investigation of the Utility of the "Behavior Support Plan Quality Evaluation Guide II" for Use in Australia

    ERIC Educational Resources Information Center

    Webber, Lynne S.; McVilly, Keith R.; Fester, Tarryn; Zazelis, Telly

    2011-01-01

    Background: The quality of behaviour support plans (BSPs) can be an important influence on the quality of the support provided to people with disability who show challenging behaviours. The Behavior Support Plan Quality Evaluation Guide II (BSP-QE II) is one tool that may be useful in assessing the quality of behaviour support plans. It has…

  6. 76 FR 16285 - Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To Update Water...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... Plan to update the Commission's human health and aquatic life stream quality objectives (also called... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To Update Water Quality Criteria for Toxic Pollutants in the Delaware...

  7. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Water quality management plans and agencies. 35.925-2 Section 35.925-2 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-2 Water quality management...

  8. 76 FR 44535 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... the California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality Management District AGENCY... the Northern Sierra Air Quality Management District (NSAQMD), Sacramento Metropolitan Air Quality...

  9. 78 FR 5292 - Approval and Promulgation of Air Quality Implementation Plans; Massachusetts and New Hampshire...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... and New Hampshire. The revised programs in Massachusetts and New Hampshire include a test and repair..., EPA New England Regional Office, Office of Ecosystem Protection, Air Quality Planning Unit, 5 Post... Protection, Air Quality Planning Unit, 5 Post Office Square--Suite 100, (Mail code OEP05-2), Boston, MA 02109...

  10. 78 FR 44494 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ...EPA is proposing to approve, as a revision of the California state implementation plan, the State's request to redesignate the Sacramento nonattainment area to attainment for the 24-hour particulate matter of ten microns or less (PM10) National Ambient Air Quality Standard (NAAQS). EPA is also proposing to approve the PM10 maintenance plan and the associated motor vehicle emissions budgets for use in transportation conformity determinations necessary for the Sacramento area. Finally, EPA is proposing to approve the attainment year emissions inventory. EPA is proposing these actions because the SIP revision meets the requirements of the Clean Air Act and EPA guidance for such plans and motor vehicle emissions budgets.

  11. 78 FR 34965 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Lima 1997 8-Hour Ozone...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Promulgation of Air Quality Implementation Plans; Ohio; Lima 1997 8-Hour Ozone Maintenance Plan Revision; Motor... 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) to replace the previously... Simulator (MOVES) emissions model. Ohio submitted the SIP revision request to EPA on January 11, 2013. DATES...

  12. 78 FR 34906 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Lima 1997 8-Hour Ozone...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Promulgation of Air Quality Implementation Plans; Ohio; Lima 1997 8-Hour Ozone Maintenance Plan Revision to... Lima, Ohio 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) to replace motor... (MOVES) emissions model. Ohio submitted the SIP revision request to EPA on January 11, 2013. DATES: This...

  13. 77 FR 38246 - Revisions to the Arizona State Implementation Plan, Arizona Department of Environmental Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ... the Arizona State Implementation Plan, Arizona Department of Environmental Quality, Maricopa County Air Quality Department, and Pima County Department of Environmental Quality AGENCY: Environmental... Department of Environmental Quality (ADEQ), Maricopa County Air Quality Department (MCAQD), and Pima County...

  14. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  15. 10 CFR 436.100 - Purpose and scope.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... General Operations Plans § 436.100 Purpose and scope. (a) Purpose. The purpose of this subpart is to... plans to establish energy conservation goals, to reduce the rate of energy consumption, to promote the... energy sources, to provide a methodology for reporting their progress in meeting the goals of those plans...

  16. SU-F-T-528: Relationship Between Tumor Size and Plan Quality Using FFF and Non-FFF Modes in Rapidarc

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, F

    2016-06-15

    Purpose: For a give PTV dose, beam-on time is shorter in the FFF than the non-FFF mode because of higher MU/min. Larger tumors usually require more complex intensity modulation, which might affect plan quality and total MU. We investigated the relationship between PTV size and plan quality using FFF and non-FFF modes. Methods: Two different PTV volumes (PTV and PTV+1 cm margin) were drawn in brain, lung and liver. 3-full to 7-partial arc (Rapidarc) of 6 MV, 1400 MU/min were studied. Plan quality was evaluated by: (a) DVH for PTV and normal tissues, (b) total MU and beam-on time, andmore » (c) passing rate for IMRT plan QA. Results: For the same PTV coverage, DVH for normal tissue was the same or slightly lower in the FFF compared with non-FFF. Total MU was 13% higher in FFF than non-FFF in the 3-arc, 7 Gy treatment, but the difference became smaller when arc number increased to 6–7 for 10–24 Gy. Larger PTV did not affect the difference in the total MU. FFF required a short beam-on time and the ratio of FFF and non-FFF was 0.34 to 0.88 for 7- and 3-arc, respectively. For larger PTV, the ratio increased to 0.45–0.90. Ratio of total MU for large PTV was 3–8% lower in the non-FFF plans. Although the small difference in MU, beam-on time was 1.1 to-1.6 times longer in the 3- and 7-arc non-FFF plans. Plan verification showed the similar gamma index passing rate. Conclusion: While total MU was similar with FFF and non-FFF modes, the beam-on time was shorter in the FFF treatment. The advantage of FFF was greater in treatments with high dose per fraction using more arc numbers. For dose less than 10 Gy, using FFF and non-FFF modes, tumor size did not affect the relationship of total MU, beam-on time.« less

  17. SU-F-P-35: A Multi-Institutional Plan Quality Checking Tool Built On Oncospace: A Shared Radiation Oncology Database System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bowers, M; Robertson, S; Moore, J

    Purpose: Late toxicity from radiation to critical structures limits the possible dose in Radiation Therapy. Perfectly conformal treatment of a target is not realizable, so the clinician must accept a certain level of collateral radiation to nearby OARs. But how much? General guidelines exist for healthy tissue sparing which guide RT treatment planning, but are these guidelines good enough to create the optimal plan given the individualized patient anatomy? We propose a means to evaluate the planned dose level to an OAR using a multi-institutional data-store of previously treated patients, so a clinician might reconsider planning objectives. Methods: The toolmore » is built on Oncospace, a federated data-store system, which consists of planning data import, web based analysis tools, and a database containing:1) DVHs: dose by percent volume delivered to each ROI for each patient previously treated and included in the database.2) Overlap Volume Histograms (OVHs): Anatomical measure defined as the percent volume of an ROI within a given distance to target structures.Clinicians know what OARs are important to spare. For any ROI, Oncospace knows for which patients’ anatomy that ROI was harder to plan in the past (the OVH is less). The planned dose should be close to the least dose of previous patients. The tool displays the dose those OARs were subjected to, and the clinician can make a determination about the planning objectives used.Multiple institutions contribute to the Oncospace Consortium, and their DVH and OVH data are combined and color coded in the output. Results: The Oncospace website provides a plan quality display tool which identifies harder to treat patients, and graphically displays the dose delivered to them for comparison with the proposed plan. Conclusion: The Oncospace Consortium manages a data-store of previously treated patients which can be used for quality checking new plans. Grant funding by Elekta.« less

  18. 77 FR 30212 - Approval and Promulgation of Air Quality Implementation Plans; Vermont; Regional Haze

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... Promulgation of Air Quality Implementation Plans; Vermont; Regional Haze AGENCY: Environmental Protection... Implementation Plan (SIP) that addresses regional haze for the first planning period from 2008 through 2018. The... numerous sources located over a wide geographic area (also referred to as the ``regional haze program...

  19. 78 FR 59841 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; West Virginia's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ...EPA is approving a redesignation request and State Implementation Plan (SIP) revision submitted by the State of West Virginia. The West Virginia Department of Environmental Protection (WVDEP) requested that the West Virginia portion of the Wheeling, WV-OH fine particulate matter (PM2.5) nonattainment area (``Wheeling Area'' or ``Area'') be redesignated as attainment for the 1997 annual PM2.5 national ambient air quality standard (NAAQS). In this rulemaking action, EPA is approving the 1997 annual PM2.5 redesignation request for the West Virginia portion of the Area. EPA is also approving the maintenance plan SIP revision that the State submitted in conjunction with its redesignation request. The maintenance plan provides for continued attainment of the 1997 annual PM2.5 NAAQS for 10 years after redesignation of the West Virginia portion of the Area. The maintenance plan includes a comprehensive emissions inventory that EPA is approving in this rulemaking. The maintenance plan also includes an insignificance determination for the onroad motor vehicle contribution of PM2.5, nitrogen oxides (NOX), and sulfur dioxide (SO2) for the West Virginia portion of the Area for purposes of transportation conformity. EPA is also approving West Virginia's insignificance determination for transportation conformity. In addition, EPA is also finding that the Area continues to attain the standard. This rulemaking action approving the 1997 annual PM2.5 NAAQS redesignation request, maintenance plan, comprehensive emissions inventory, and insignificance determination for transportation conformity for the West Virginia portion of the Area is based on EPA's determination that the Area has met the criteria for redesignation to attainment specified in the Clean Air Act (CAA).

  20. 76 FR 43183 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District... Metropolitan Air Quality Management District (SMAQMD or District) portion of the California State... Designee. (i) Incorporation by Reference. (A) Sacramento Metropolitan Air Quality Management District. (1...

  1. 75 FR 18068 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District... final action to approve revisions to the Sacramento Metropolitan Air Quality Management District (SMAQMD...) * * * (362) * * * (i) * * * (C) Sacramento Metropolitan Air Quality Management District. (1) Rule 450...

  2. SU-F-T-600: Influence of Acuros XB and AAA Dose Calculation Algorithms On Plan Quality Metrics and Normal Lung Doses in Lung SBRT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yaparpalvi, R; Mynampati, D; Kuo, H

    Purpose: To study the influence of superposition-beam model (AAA) and determinant-photon transport-solver (Acuros XB) dose calculation algorithms on the treatment plan quality metrics and on normal lung dose in Lung SBRT. Methods: Treatment plans of 10 Lung SBRT patients were randomly selected. Patients were prescribed to a total dose of 50-54Gy in 3–5 fractions (10?5 or 18?3). Doses were optimized accomplished with 6-MV using 2-arcs (VMAT). Doses were calculated using AAA algorithm with heterogeneity correction. For each plan, plan quality metrics in the categories- coverage, homogeneity, conformity and gradient were quantified. Repeat dosimetry for these AAA treatment plans was performedmore » using AXB algorithm with heterogeneity correction for same beam and MU parameters. Plan quality metrics were again evaluated and compared with AAA plan metrics. For normal lung dose, V{sub 20} and V{sub 5} to (Total lung- GTV) were evaluated. Results: The results are summarized in Supplemental Table 1. PTV volume was mean 11.4 (±3.3) cm{sup 3}. Comparing RTOG 0813 protocol criteria for conformality, AXB plans yielded on average, similar PITV ratio (individual PITV ratio differences varied from −9 to +15%), reduced target coverage (−1.6%) and increased R50% (+2.6%). Comparing normal lung doses, the lung V{sub 20} (+3.1%) and V{sub 5} (+1.5%) were slightly higher for AXB plans compared to AAA plans. High-dose spillage ((V105%PD - PTV)/ PTV) was slightly lower for AXB plans but the % low dose spillage (D2cm) was similar between the two calculation algorithms. Conclusion: AAA algorithm overestimates lung target dose. Routinely adapting to AXB for dose calculations in Lung SBRT planning may improve dose calculation accuracy, as AXB based calculations have been shown to be closer to Monte Carlo based dose predictions in accuracy and with relatively faster computational time. For clinical practice, revisiting dose-fractionation in Lung SBRT to correct for dose

  3. 77 FR 76415 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Redesignation of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ...EPA is approving a redesignation request and State Implementation Plan (SIP) revision submitted by the State of West Virginia. The West Virginia Department of Environmental Protection (WVDEP) requested that the West Virginia portion of the Huntington- Ashland, WV-KY-OH fine particulate matter (PM2.5) nonattainment area (``Huntington-Ashland Area'' or ``Area'') be redesignated as attainment for the 1997 annual PM2.5 national ambient air quality standard (NAAQS). In this rulemaking action, EPA is approving the 1997 annual PM2.5 redesignation request for the West Virginia portion of the Area. EPA is also approving the maintenance plan SIP revision that the State submitted in conjunction with its redesignation request. The maintenance plan provides for continued attainment of the 1997 annual PM2.5 NAAQS for 10 years after redesignation of the West Virginia portion of the Area. The maintenance plan includes an insignificance determination for the onroad motor vehicle contribution of PM2.5, nitrogen oxides (NOX), and sulfur dioxide (SO2) for the West Virginia portion of the Area for purposes of transportation conformity. EPA is approving West Virginia's insignificance determination for transportation conformity. EPA is also finding that the Area continues to attain the standard. This rulemaking action approving the 1997 annual PM2.5 NAAQS redesignation request, maintenance plan, and insignificance determination for transportation conformity for the West Virginia portion of the Area is based on EPA's determination that the Area has met the criteria for redesignation to attainment specified in the Clean Air Act (CAA).

  4. 77 FR 5191 - Approval and Promulgation of Air Quality Implementation Plans; District of Columbia; Regional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-02

    ... Promulgation of Air Quality Implementation Plans; District of Columbia; Regional Haze State Implementation Plan... of Columbia Regional Haze Plan, a revision to the District of Columbia State Implementation Plan (SIP... existing anthropogenic impairment of visibility in mandatory Class I areas through a regional haze program...

  5. 76 FR 20242 - Revisions to the California State Implementation Plan; Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... the California State Implementation Plan; Sacramento Metropolitan Air Quality Management District... a revision to the Sacramento Metropolitan Air Quality Management District's portion of the... (Permit No. 17359), which was issued by the Sacramento Metropolitan Air Quality Management District...

  6. 75 FR 40762 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION... Management District (SMAQMD) and South Coast Air Quality Management District (SCAQMD) portions of the...

  7. 78 FR 16792 - Designation of Areas for Air Quality Planning Purposes; State of California; Imperial Valley...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-19

    ... (see, e.g., the PM 10 area designations in 40 CFR 81.305 for Coso Junction planning area, Owens Valley..., this action: Is not ``significant regulatory actions'' subject to review by the Office of Management..., 1999); Is not economically significant regulatory actions based on health or safety risks subject to...

  8. 76 FR 76115 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... the California State Implementation Plan, Feather River Air Quality Management District AGENCY... limited disapproval of revisions to the Feather River Air Quality Management District (FRAQMD) portion of..., Regulatory Planning and Review The Office of Management and Budget (OMB) has exempted this regulatory action...

  9. 76 FR 72142 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-22

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does not...

  10. 76 FR 59344 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-26

    ... Promulgation of Air Quality Implementation Plans; Maryland; Transportation Conformity Regulations AGENCY... Implementation Plan (SIP) revision submitted by Maryland to establish transportation conformity regulations. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a...

  11. 40 CFR 81.42 - Chattanooga Interstate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Chattanooga Interstate Air Quality...) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.42 Chattanooga Interstate Air Quality Control Region. The Chattanooga...

  12. 40 CFR 81.35 - Louisville Interstate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Louisville Interstate Air Quality...) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.35 Louisville Interstate Air Quality Control Region. The Louisville...

  13. 40 CFR 81.36 - Maricopa Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Maricopa Intrastate Air Quality...) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.36 Maricopa Intrastate Air Quality Control Region. The Phoenix-Tucson...

  14. 40 CFR 81.51 - Portland Interstate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Portland Interstate Air Quality...) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.51 Portland Interstate Air Quality Control Region. The Portland Interstate...

  15. 40 CFR 81.36 - Maricopa Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 17 2011-07-01 2011-07-01 false Maricopa Intrastate Air Quality...) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.36 Maricopa Intrastate Air Quality Control Region. The Phoenix-Tucson...

  16. 40 CFR 81.42 - Chattanooga Interstate Air Quality Control Region.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 18 2013-07-01 2013-07-01 false Chattanooga Interstate Air Quality...) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.42 Chattanooga Interstate Air Quality Control Region. The Chattanooga...

  17. 40 CFR 81.51 - Portland Interstate Air Quality Control Region.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 18 2013-07-01 2013-07-01 false Portland Interstate Air Quality...) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.51 Portland Interstate Air Quality Control Region. The Portland Interstate...

  18. 40 CFR 81.35 - Louisville Interstate Air Quality Control Region.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 17 2011-07-01 2011-07-01 false Louisville Interstate Air Quality...) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.35 Louisville Interstate Air Quality Control Region. The Louisville...

  19. 40 CFR 81.36 - Maricopa Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 18 2012-07-01 2012-07-01 false Maricopa Intrastate Air Quality...) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.36 Maricopa Intrastate Air Quality Control Region. The Phoenix-Tucson...

  20. 40 CFR 81.42 - Chattanooga Interstate Air Quality Control Region.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 18 2014-07-01 2014-07-01 false Chattanooga Interstate Air Quality...) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.42 Chattanooga Interstate Air Quality Control Region. The Chattanooga...

  1. 40 CFR 81.36 - Maricopa Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 18 2014-07-01 2014-07-01 false Maricopa Intrastate Air Quality...) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.36 Maricopa Intrastate Air Quality Control Region. The Phoenix-Tucson...

  2. 40 CFR 81.42 - Chattanooga Interstate Air Quality Control Region.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 18 2012-07-01 2012-07-01 false Chattanooga Interstate Air Quality...) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.42 Chattanooga Interstate Air Quality Control Region. The Chattanooga...

  3. 40 CFR 81.35 - Louisville Interstate Air Quality Control Region.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 18 2012-07-01 2012-07-01 false Louisville Interstate Air Quality...) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.35 Louisville Interstate Air Quality Control Region. The Louisville...

  4. 40 CFR 81.36 - Maricopa Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 18 2013-07-01 2013-07-01 false Maricopa Intrastate Air Quality...) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.36 Maricopa Intrastate Air Quality Control Region. The Phoenix-Tucson...

  5. 40 CFR 81.42 - Chattanooga Interstate Air Quality Control Region.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 17 2011-07-01 2011-07-01 false Chattanooga Interstate Air Quality...) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.42 Chattanooga Interstate Air Quality Control Region. The Chattanooga...

  6. 40 CFR 81.35 - Louisville Interstate Air Quality Control Region.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 18 2014-07-01 2014-07-01 false Louisville Interstate Air Quality...) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.35 Louisville Interstate Air Quality Control Region. The Louisville...

  7. 40 CFR 81.35 - Louisville Interstate Air Quality Control Region.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 18 2013-07-01 2013-07-01 false Louisville Interstate Air Quality...) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.35 Louisville Interstate Air Quality Control Region. The Louisville...

  8. Summary of strategies for planning Productivity Improvement and Quality Enhancement (PIQE)

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The Summary of NASA Strategies for Productivity Improvement and Quality Enhancement respond to NASA's eighth top goal: Establish NASA as a leader in the development and application of advanced technology and management practices which contribute to significant increases in both Agency and national productivity. The Strategies provide the framework for development of the agency-wide Productivity Improvement and Quality Enhancement (PIQE) Plans.

  9. Factors Determining Quality of Care in Family Planning Services in Africa: A Systematic Review of Mixed Evidence

    PubMed Central

    Tessema, Gizachew Assefa; Streak Gomersall, Judith; Mahmood, Mohammad Afzal; Laurence, Caroline O.

    2016-01-01

    Background Improving use of family planning services is key to improving maternal health in Africa, and provision of quality of care in family planning services is critical to support higher levels of contraceptive uptake. The objective of this systematic review was to synthesize the available evidence on factors determining the quality of care in family planning services in Africa. Methods Quantitative and qualitative studies undertaken in Africa, published in English, in grey and commercial literature, between 1990 and 2015 were considered. Methodological quality of included studies was assessed using standardized tools. Findings from the quantitative studies were summarized using narrative and tables. Client satisfaction was used to assess the quality of care in family planning services in the quantitative component of the review. Meta-aggregation was used to synthesize the qualitative study findings. Results From 4334 records, 11 studies (eight quantitative, three qualitative) met the review eligibility criteria. The review found that quality of care was influenced by client, provider and facility factors, and structural and process aspects of the facilities. Client’s waiting time, provider competency, provision/prescription of injectable methods, maintaining privacy and confidentiality were the most commonly identified process factors. The quality of stock inventory was the most commonly identified structural factor. The quality of care was also positively associated with privately-owned facilities. The qualitative synthesis revealed additional factors including access related factors such as ‘pre-requisites to be fulfilled by the clients and cost of services, provider workload, and providers’ behaviour. Conclusion There is limited evidence on factors determining quality of care in family planning services in Africa that shows quality of care is influenced by multiple factors. The evidence suggests that lowering access barriers and avoiding unnecessary

  10. Market and plan characteristics related to HMO quality and improvement.

    PubMed

    Scanlon, Dennis P; Swaminathan, Shailender; Chernew, Michael; Lee, Woolton

    2006-12-01

    Existing research on health plan performance examines whether variation in plans' scores is related to enrollee and health plan traits, primarily using cross-sectional research designs. This study extends that literature by incorporating data on market characteristics using a longitudinal framework. We estimate multivariate growth models that relate plan performance on standard measures to market and HMO characteristics using an unbalanced panel of data for 1998 to 2002. We find that HMO competition is not associated with better performance or greater rates of improvement in performance on the HEDIS chronic care measures. HMO penetration, on the other hand, is positively associated with HEDIS performance in several of the chronic care process-and-outcomes measures but not with a greater rate of improvement through time. Our analysis indicates that a significant percentage of the unexplained variation in quality improvement is because of permanent, unobserved plan-level characteristics that future research should strive to identify.

  11. 75 FR 54805 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota; Carbon Monoxide (CO...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... Promulgation of Air Quality Implementation Plans; Minnesota; Carbon Monoxide (CO) Limited Maintenance Plan for... June 16, 2010, to revise the Minnesota State Implementation Plan (SIP) for carbon monoxide (CO) under the Clean Air Act (CAA). The State has submitted a limited maintenance plan for CO showing continued...

  12. Education for All: National Plan of Action, 2003-2015

    ERIC Educational Resources Information Center

    Online Submission, 2005

    2005-01-01

    Background: The Lao People's Democratic Republic (PDR) Education for All National Plan of Action (EFA NPA) for 2003-2015 seeks to accomplish three major tasks: equitable access, improved quality and relevance and strengthened education management. Purpose: To design a National Education For All Action Plan for basic education in Lao PDR which…

  13. Poster - Thur Eve - 76: A quality control to achieve planning consistency in arc radiotherapy of the prostate.

    PubMed

    Zeng, G; Murphy, J; Annis, S-L; Wu, X; Wang, Y; McGowan, T; Macpherson, M

    2012-07-01

    To report a quality control program in prostate radiation therapy at our center that includes semi-automated planning process to generate high quality plans and in-house software to track plan quality in the subsequent clinical application. Arc planning in Eclipse v10.0 was preformed for both intact prostate and post-prostatectomy treatments. The planning focuses on DVH requirements and dose distributions being able to tolerate daily setup variations. A modified structure set is used to standardize the optimization, including short rectum and bladder in the fields to effectively tighten dose to target and a rectum expansion with 1cm cropped from PTV to block dose and shape posterior isodose lines. Structure, plan and optimization templates are used to streamline plan generation. DVH files are exported from Eclipse to a quality tracking software with GUI written in Matlab that can report the dose-volume data either for an individual patient or over a patient population. For 100 intact prostate patients treated with 78Gy, rectal D50, D25, D15 and D5 are 30.1±6.2Gy, 50.6±7.9Gy, 65.9±6.0Gy and 76.6±1.4Gy respectively, well below the limits 50Gy, 65Gy, 75Gy and 78Gy respectively. For prostate bed with prescription of 66Gy, rectal D50 is 35.9±6.9Gy. In both sites, PTV is covered by 95% prescription and the hotspots are less than 5%. The semi-automated planning method can efficiently create high quality plans while the tracking software can monitor the feedback from clinical application. It is a comprehensive and robust quality control program in radiation therapy. © 2012 American Association of Physicists in Medicine.

  14. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct... Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality Management District (SMAQMD...

  15. 76 FR 44493 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality Management District AGENCY... approve revisions to the Northern Sierra Air Quality Management District (NSAQMD), Sacramento Metropolitan...

  16. 77 FR 23193 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0180; FRL-9652-3] Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... the Yolo-Solano Air Quality Management District portion of the California State Implementation Plan...

  17. 77 FR 32483 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9670-9] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  18. 75 FR 32353 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0276; FRL-9139-8] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  19. 75 FR 48894 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Revisions to Emissions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ... Promulgation of Air Quality Implementation Plans; New Mexico; Revisions to Emissions Inventory Reporting.... SUMMARY: The EPA is proposing to approve revisions to the New Mexico State Implementation Plan (SIP... Quality Standards that EPA has established for criteria pollutants such as ozone, particulate matter, and...

  20. 78 FR 65593 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ...] Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Infrastructure Requirements for the 2010 Nitrogen Dioxide National Ambient Air Quality Standards AGENCY: Environmental Protection... revised national ambient air quality standards (NAAQS) are promulgated, the CAA requires states to submit...

  1. Summarized Costs, Placement Of Quality Stars, And Other Online Displays Can Help Consumers Select High-Value Health Plans.

    PubMed

    Greene, Jessica; Hibbard, Judith H; Sacks, Rebecca M

    2016-04-01

    Starting in 2017, all state and federal health insurance exchanges will present quality data on health plans in addition to cost information. We analyzed variations in the current design of information on state exchanges to identify presentation approaches that encourage consumers to take quality as well as cost into account when selecting a health plan. Using an online sample of 1,025 adults, we randomly assigned participants to view the same comparative information on health plans, displayed in different ways. We found that consumers were much more likely to select a high-value plan when cost information was summarized instead of detailed, when quality stars were displayed adjacent to cost information, when consumers understood that quality stars signified the quality of medical care, and when high-value plans were highlighted with a check mark or blue ribbon. These approaches, which were equally effective for participants with higher and lower numeracy, can inform the development of future displays of plan information in the exchanges. Project HOPE—The People-to-People Health Foundation, Inc.

  2. PNNL Apatite Investigation at 100-NR-2 Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    In 2004, the U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory (PNNL), and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at the 100-N Area would include apatite sequestration as the primary treatment, followed by a secondary treatment if necessary. Since then, the agencies have worked together to agree on which apatite sequestration technology has the greatest chance of reducing strontium-90 flux to the Columbia River. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the PNNL Apatite Investigation at 100-NR-2more » Project. The plan is designed to be used exclusively by project staff.« less

  3. NASA Planning for Orion Multi-Purpose Crew Vehicle Ground Operations

    NASA Technical Reports Server (NTRS)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    The NASA Orion Ground Processing Team was originally formed by the Kennedy Space Center (KSC) Constellation (Cx) Project Office's Orion Division to define, refine and mature pre-launch and post-landing ground operations for the Orion human spacecraft. The multidisciplined KSC Orion team consisted of KSC civil servant, SAIC, Productivity Apex, Inc. and Boeing-CAPPS engineers, project managers and safety engineers, as well as engineers from Constellation's Orion Project and Lockheed Martin Orion Prime contractor. The team evaluated the Orion design configurations as the spacecraft concept matured between Systems Design Review (SDR), Systems Requirement Review (SRR) and Preliminary Design Review (PDR). The team functionally decomposed prelaunch and post-landing steps at three levels' of detail, or tiers, beginning with functional flow block diagrams (FFBDs). The third tier FFBDs were used to build logic networks and nominal timelines. Orion ground support equipment (GSE) was identified and mapped to each step. This information was subsequently used in developing lower level operations steps in a Ground Operations Planning Document PDR product. Subject matter experts for each spacecraft and GSE subsystem were used to define 5th - 95th percentile processing times for each FFBD step, using the Delphi Method. Discrete event simulations used this information and the logic network to provide processing timeline confidence intervals for launch rate assessments. The team also used the capabilities of the KSC Visualization Lab, the FFBDs and knowledge of the spacecraft, GSE and facilities to build visualizations of Orion pre-launch and postlanding processing at KSC. Visualizations were a powerful tool for communicating planned operations within the KSC community (i.e., Ground Systems design team), and externally to the Orion Project, Lockheed Martin spacecraft designers and other Constellation Program stakeholders during the SRR to PDR timeframe. Other operations planning

  4. Purposefully Poetic

    ERIC Educational Resources Information Center

    Kelin, Daniel A., II.

    2017-01-01

    Arts education has no firm place in Hawaii's public school system. Even the Board of Education plan and the State Department of Education's plans differ in how they refer to and make recommendations about the place or purpose of arts education. This article reviews examples of competing policy to suggest how arts-integrated style teaching could…

  5. 75 FR 34669 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... Promulgation of Air Quality Implementation Plans; Maryland; Transportation Conformity Regulations AGENCY... Implementation Plan (SIP) revision submitted by Maryland for Transportation Conformity Regulations. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final...

  6. 46 CFR 107.301 - Purpose.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Purpose. 107.301 Section 107.301 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Plan Approval § 107.301 Purpose. This subpart prescribes procedures for submitting plans and...

  7. 46 CFR 107.301 - Purpose.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Purpose. 107.301 Section 107.301 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Plan Approval § 107.301 Purpose. This subpart prescribes procedures for submitting plans and...

  8. 46 CFR 107.301 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Purpose. 107.301 Section 107.301 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Plan Approval § 107.301 Purpose. This subpart prescribes procedures for submitting plans and...

  9. 46 CFR 107.301 - Purpose.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Purpose. 107.301 Section 107.301 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Plan Approval § 107.301 Purpose. This subpart prescribes procedures for submitting plans and...

  10. 46 CFR 107.301 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Purpose. 107.301 Section 107.301 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Plan Approval § 107.301 Purpose. This subpart prescribes procedures for submitting plans and...

  11. 40 CFR 81.77 - Puerto Rico Air Quality Control Region.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 17 2011-07-01 2011-07-01 false Puerto Rico Air Quality Control Region... PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.77 Puerto Rico Air Quality Control Region. The Puerto Rico Air Quality Control Region...

  12. 40 CFR 81.77 - Puerto Rico Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Puerto Rico Air Quality Control Region... PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.77 Puerto Rico Air Quality Control Region. The Puerto Rico Air Quality Control Region...

  13. 40 CFR 81.77 - Puerto Rico Air Quality Control Region.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 18 2012-07-01 2012-07-01 false Puerto Rico Air Quality Control Region... PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.77 Puerto Rico Air Quality Control Region. The Puerto Rico Air Quality Control Region...

  14. 40 CFR 81.77 - Puerto Rico Air Quality Control Region.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 18 2013-07-01 2013-07-01 false Puerto Rico Air Quality Control Region... PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.77 Puerto Rico Air Quality Control Region. The Puerto Rico Air Quality Control Region...

  15. 77 FR 12495 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final... Quality Management District (AVAQMD) and Mojave Desert Air Quality Management District (MDAQMD) portion of...

  16. 77 FR 41279 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State Implementation Plan AGENCY... the Regional Haze State Implementation Plan (SIP) (hereafter RH SIP) revision submitted by the... anthropogenic impairment of visibility in mandatory Class I areas [[Page 41280

  17. 77 FR 28338 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Reasonably Available...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-14

    ... Promulgation of Air Quality Implementation Plans; Maryland; Reasonably Available Control Technology for the 1997 8-Hour Ozone National Ambient Air Quality Standard AGENCY: Environmental Protection Agency (EPA... available control technology (RACT) for the 1997 8-hour ozone national ambient air quality standard (NAAQS...

  18. 78 FR 75902 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Philadelphia County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-13

    ...] Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Philadelphia County Reasonably Available Control Technology Under the 1997 8-Hour Ozone National Ambient Air Quality Standard AGENCY... Department of Environmental Protection, Bureau of Air Quality Control, P.O. Box 8468, 400 Market Street...

  19. 40 CFR 81.90 - Androscoggin Valley Interstate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Quality Control Region. 81.90 Section 81.90 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.90 Androscoggin Valley Interstate Air Quality Control Region. The...

  20. 40 CFR 81.90 - Androscoggin Valley Interstate Air Quality Control Region.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Quality Control Region. 81.90 Section 81.90 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.90 Androscoggin Valley Interstate Air Quality Control Region. The...

  1. 40 CFR 81.43 - Metropolitan Toledo Interstate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.43 Metropolitan Toledo Interstate Air Quality Control Region. The Metropolitan Toledo Interstate Air Quality Control Region (Ohio-Michigan) consists of the territorial area...

  2. 40 CFR 81.75 - Metropolitan Charlotte Interstate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.75 Metropolitan Charlotte Interstate Air Quality Control Region. The Metropolitan Charlotte Interstate Air Quality Control Region (North Carolina-South Carolina) has been revised...

  3. 40 CFR 81.47 - Central Oklahoma Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.47 Central Oklahoma Intrastate Air Quality Control Region. The Metropolitan Oklahoma Intrastate Air Quality Control Region has been renamed the Central Oklahoma Intrastate...

  4. 40 CFR 81.44 - Metropolitan Memphis Interstate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.44 Metropolitan Memphis Interstate Air Quality Control Region. The Metropolitan Memphis Interstate Air Quality Control Region (Arkansas-Mississippi-Tennessee) consists of the...

  5. 40 CFR 81.16 - Metropolitan Denver Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.16 Metropolitan Denver Intrastate Air Quality Control Region. The Metropolitan Denver Intrastate Air Quality Control Region (Colorado) consists of the territorial area...

  6. 40 CFR 81.24 - Niagara Frontier Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.24 Niagara Frontier Intrastate Air Quality Control Region. The Niagara Frontier Intrastate Air Quality Control Region (New York) consists of the territorial area...

  7. 40 CFR 81.28 - Metropolitan Baltimore Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.28 Metropolitan Baltimore Intrastate Air Quality Control Region. The Metropolitan Baltimore Intrastate Air Quality Control Region (Maryland) consists of the territorial area...

  8. 40 CFR 81.23 - Southwest Pennsylvania Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.23 Southwest Pennsylvania Intrastate Air Quality Control Region. The Southwest Pennsylvania Intrastate Air Quality Control Region is redesignated to consist of the territorial...

  9. 40 CFR 81.30 - Southeastern Wisconsin Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.30 Southeastern Wisconsin Intrastate Air Quality Control Region. The Metropolitan Milwaukee Intrastate Air Quality Control Region (Wisconsin) has been renamed the Southeastern...

  10. 40 CFR 81.19 - Metropolitan Boston Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.19 Metropolitan Boston Intrastate Air Quality Control Region. The Metropolitan Boston Intrastate Air Quality Control Region (Massachusetts) consists of the territorial area...

  11. 40 CFR 81.29 - Metropolitan Indianapolis Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Air Quality Control Region. 81.29 Section 81.29 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.29 Metropolitan Indianapolis Intrastate Air Quality Control...

  12. 40 CFR 81.78 - Metropolitan Portland Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.78 Metropolitan Portland Intrastate Air Quality Control Region. The Metropolitan Portland Intrastate Air Quality Control Region (Maine) consists of the territorial area...

  13. 40 CFR 81.62 - Northeast Mississippi Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.62 Northeast Mississippi Intrastate Air Quality Control Region. The Alabama-Mississippi-Tennessee Interstate Air Quality Control Region has been renamed the Northeast...

  14. 40 CFR 81.31 - Metropolitan Providence Interstate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.31 Metropolitan Providence Interstate Air Quality Control Region. The Metropolitan Providence Interstate Air Quality Control Region (Rhode Island-Massachusetts) consists of the...

  15. 40 CFR 81.75 - Metropolitan Charlotte Interstate Air Quality Control Region.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.75 Metropolitan Charlotte Interstate Air Quality Control Region. The Metropolitan Charlotte Interstate Air Quality Control Region (North Carolina-South Carolina) has been revised...

  16. 40 CFR 81.16 - Metropolitan Denver Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.16 Metropolitan Denver Intrastate Air Quality Control Region. The Metropolitan Denver Intrastate Air Quality Control Region (Colorado) consists of the territorial area...

  17. 40 CFR 81.24 - Niagara Frontier Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.24 Niagara Frontier Intrastate Air Quality Control Region. The Niagara Frontier Intrastate Air Quality Control Region (New York) consists of the territorial area...

  18. 40 CFR 81.43 - Metropolitan Toledo Interstate Air Quality Control Region.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.43 Metropolitan Toledo Interstate Air Quality Control Region. The Metropolitan Toledo Interstate Air Quality Control Region (Ohio-Michigan) consists of the territorial area...

  19. 40 CFR 81.62 - Northeast Mississippi Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.62 Northeast Mississippi Intrastate Air Quality Control Region. The Alabama-Mississippi-Tennessee Interstate Air Quality Control Region has been renamed the Northeast...

  20. 40 CFR 81.16 - Metropolitan Denver Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.16 Metropolitan Denver Intrastate Air Quality Control Region. The Metropolitan Denver Intrastate Air Quality Control Region (Colorado) consists of the territorial area...

  1. 40 CFR 81.47 - Central Oklahoma Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.47 Central Oklahoma Intrastate Air Quality Control Region. The Metropolitan Oklahoma Intrastate Air Quality Control Region has been renamed the Central Oklahoma Intrastate...

  2. 40 CFR 81.31 - Metropolitan Providence Interstate Air Quality Control Region.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.31 Metropolitan Providence Interstate Air Quality Control Region. The Metropolitan Providence Interstate Air Quality Control Region (Rhode Island-Massachusetts) consists of the...

  3. 40 CFR 81.23 - Southwest Pennsylvania Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.23 Southwest Pennsylvania Intrastate Air Quality Control Region. The Southwest Pennsylvania Intrastate Air Quality Control Region is redesignated to consist of the territorial...

  4. 40 CFR 81.16 - Metropolitan Denver Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.16 Metropolitan Denver Intrastate Air Quality Control Region. The Metropolitan Denver Intrastate Air Quality Control Region (Colorado) consists of the territorial area...

  5. 40 CFR 81.79 - Northeastern Oklahoma Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.79 Northeastern Oklahoma Intrastate Air Quality Control Region. The Metropolitan Tulsa Intrastate Air Quality Control Region has been renamed the Northeastern Oklahoma Intrastate...

  6. 40 CFR 81.30 - Southeastern Wisconsin Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.30 Southeastern Wisconsin Intrastate Air Quality Control Region. The Metropolitan Milwaukee Intrastate Air Quality Control Region (Wisconsin) has been renamed the Southeastern...

  7. 40 CFR 81.31 - Metropolitan Providence Interstate Air Quality Control Region.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.31 Metropolitan Providence Interstate Air Quality Control Region. The Metropolitan Providence Interstate Air Quality Control Region (Rhode Island-Massachusetts) consists of the...

  8. 40 CFR 81.62 - Northeast Mississippi Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.62 Northeast Mississippi Intrastate Air Quality Control Region. The Alabama-Mississippi-Tennessee Interstate Air Quality Control Region has been renamed the Northeast...

  9. 40 CFR 81.28 - Metropolitan Baltimore Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.28 Metropolitan Baltimore Intrastate Air Quality Control Region. The Metropolitan Baltimore Intrastate Air Quality Control Region (Maryland) consists of the territorial area...

  10. 40 CFR 81.78 - Metropolitan Portland Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.78 Metropolitan Portland Intrastate Air Quality Control Region. The Metropolitan Portland Intrastate Air Quality Control Region (Maine) consists of the territorial area...

  11. 40 CFR 81.78 - Metropolitan Portland Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.78 Metropolitan Portland Intrastate Air Quality Control Region. The Metropolitan Portland Intrastate Air Quality Control Region (Maine) consists of the territorial area...

  12. 40 CFR 81.28 - Metropolitan Baltimore Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.28 Metropolitan Baltimore Intrastate Air Quality Control Region. The Metropolitan Baltimore Intrastate Air Quality Control Region (Maryland) consists of the territorial area...

  13. 40 CFR 81.62 - Northeast Mississippi Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.62 Northeast Mississippi Intrastate Air Quality Control Region. The Alabama-Mississippi-Tennessee Interstate Air Quality Control Region has been renamed the Northeast...

  14. 40 CFR 81.28 - Metropolitan Baltimore Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.28 Metropolitan Baltimore Intrastate Air Quality Control Region. The Metropolitan Baltimore Intrastate Air Quality Control Region (Maryland) consists of the territorial area...

  15. 40 CFR 81.30 - Southeastern Wisconsin Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.30 Southeastern Wisconsin Intrastate Air Quality Control Region. The Metropolitan Milwaukee Intrastate Air Quality Control Region (Wisconsin) has been renamed the Southeastern...

  16. 40 CFR 81.43 - Metropolitan Toledo Interstate Air Quality Control Region.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.43 Metropolitan Toledo Interstate Air Quality Control Region. The Metropolitan Toledo Interstate Air Quality Control Region (Ohio-Michigan) consists of the territorial area...

  17. 40 CFR 81.24 - Niagara Frontier Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.24 Niagara Frontier Intrastate Air Quality Control Region. The Niagara Frontier Intrastate Air Quality Control Region (New York) consists of the territorial area...

  18. 40 CFR 81.29 - Metropolitan Indianapolis Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Air Quality Control Region. 81.29 Section 81.29 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.29 Metropolitan Indianapolis Intrastate Air Quality Control...

  19. 40 CFR 81.31 - Metropolitan Providence Interstate Air Quality Control Region.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.31 Metropolitan Providence Interstate Air Quality Control Region. The Metropolitan Providence Interstate Air Quality Control Region (Rhode Island-Massachusetts) consists of the...

  20. 40 CFR 81.47 - Central Oklahoma Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.47 Central Oklahoma Intrastate Air Quality Control Region. The Metropolitan Oklahoma Intrastate Air Quality Control Region has been renamed the Central Oklahoma Intrastate...