75 FR 16552 - High-Speed Intercity Passenger Rail (HSIPR) Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-01
..., energy savings from traffic diversions from other modes, employment of green building and manufacturing... selections for the High-Speed Intercity Passenger Rail (HSIPR) Program. This notice builds on the program...
75 FR 16564 - High-Speed Intercity Passenger Rail (HSIPR) Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-01
... services to avoid shipping delays. Application forms are available at http://www.fra.dot.gov/Pages/2243..., and 501--Intercity Passenger Rail Service Corridor Capital Assistance (codified at 49 U.S.C. chapter... High Speed Rail Corridors and Intercity Passenger Rail Service.'' This document incorporates interim...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-16
... the Atlanta to Charlotte Portion of the Southeast High Speed Rail Corridor AGENCY: Federal Rail... potential passenger rail improvements between Atlanta, GA and Charlotte, NC, along the Southeast High-Speed... federal High-Speed Intercity Passenger Rail (HSIPR) program and includes the development of a Passenger...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-04
... purpose of the 3C ``Quick Start'' Passenger Rail Project is to reestablish intercity conventional speed... predictable and consistent travel times. It is intended to provide travel options and develop the passenger... through the High Speed Intercity Passenger Rail Program (HSIPR Program) administered by the FRA and funded...
75 FR 38343 - High-Speed Intercity Passenger Rail (HSIPR) Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-01
...This notice details the application requirements and procedures for obtaining funding for high-speed and intercity passenger rail Service Development Programs available under the Transportation, Housing and Urban Development, and Related Agencies Appropriations Act for 2010 (Div. A of the Consolidated Appropriations Act, 2010 (Pub. L. 111-117, Dec. 16, 2009)). The Federal Railroad Administration has issued a separate notice in today's edition of the Federal Register for Fiscal Year 2010 funding made available for Individual Projects. This document incorporates interim guidance required for the HSIPR program pursuant to the Transportation, Housing and Urban Development, and Related Agencies Appropriations Act for 2010 and 49 U.S.C. 24402(a)(2). The funding opportunities described in this notice are available under Catalog of Federal Domestic Assistance (CFDA) number 20.319.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-08
... Washington State is to improve intercity passenger rail service by reducing travel times, achieving greater... intercity travel demand. To achieve these goals WSDOT applied for federal funding through the High Speed Intercity Passenger Rail Program (HSIPR Program) administered by the FRA and funded by the American Recovery...
75 FR 16562 - High-Speed Intercity Passenger Rail (HSIPR) Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-01
...), passenger traffic and services (marketing, ticketing, station, and on- board services), and general... retention, ``green'' environmental outcomes, potential energy savings, and effects on community livability. Program Management Approach--A phased program implementation strategy including a preliminary description...
76 FR 14443 - High-Speed Intercity Passenger Rail (HSIPR) Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-16
... Environmental Policy Act (NEPA) documentation, final design (FD), and construction. For the purpose of this... designing, engineering, location surveying, mapping, environmental studies, and acquiring rights-of-way..., final design, and construction activities are eligible to receive funding. For applications for Service...
75 FR 38365 - High-Speed Intercity Passenger Rail (HSIPR) Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-01
... notice in today's edition of the Federal Register for Fiscal Year 2010 funding made available for Service... and 49 U.S.C. 24402(a)(2). The funding opportunities described in this notice are available under... [email protected] , or by mail: U.S. Department of Transportation, Federal Railroad Administration, MS-20...
High-speed and intercity passenger rail testing strategy.
DOT National Transportation Integrated Search
2013-05-01
This high-speed and intercity passenger rail (HSIPR) testing strategy addresses the requirements for testing of high-speed train sets and technology before introduction to the North American railroad system. The report documents the results of a surv...
76 FR 55335 - Alternate Passenger Rail Service Pilot Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-07
... proceeding to develop a pilot program that permits a rail carrier or rail carriers that own infrastructure... develop a pilot program that permits a rail carrier or rail carriers that own infrastructure over which... that permits a rail carrier or rail carriers that own infrastructure over which Amtrak operates a...
76 FR 77716 - Alternate Passenger Rail Service Pilot Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-14
... program that permits a rail carrier or rail carriers that own infrastructure over which Amtrak operates... develops a pilot program that permits a rail carrier or rail carriers that own infrastructure over which... the infrastructure as described in Sec. 269.7 of this final rule. In addition, such information...
FY 1998 Proposed Rail Improvement Program Supplement
DOT National Transportation Integrated Search
1997-01-01
This FY 1998 Proposed Rail Improvement Program Supplement contains those rail plan amendments which have been published subsequent to the FY 1997 Proposed Rail Improvement program supplement. This document also contains the benefit/cost methodology u...
Wheel/Rail Noise and Vibration Control
DOT National Transportation Integrated Search
1974-05-01
Reported here are the interim results of a program under the UMTA Urban Rail Supporting Technology Program to develop a basic understanding of urban transit wheel/rail noise generation for application to the evaluation and improvement of wheel/rail n...
2009-12-01
6 Intercity Passenger Rail Program (Amtrak) .....................................................................7 Intercity Bus Security Grant...20 Additionally Amtrak is eligible to receive funding to continue security enhancements for its intercity rail services between high-risk urban...Research Service 7 Intercity Passenger Rail Program (Amtrak) The Intercity Passenger Rail Program (IPR) is designed to enhance security of the
FY 1998 Proposed Rail Improvement Program
DOT National Transportation Integrated Search
1997-01-01
The Illinois Department of Transportation has, in the past, published its Rail program yearly, and its Rail plan as needs dictate. The department has combined : both documents into one. This new document, as with those Programs and Plans : that have ...
DOT National Transportation Integrated Search
1975-12-01
Frequency domain computer programs developed or acquired by TSC for the analysis of rail vehicle dynamics are described in two volumes. Volume I defines the general analytical capabilities required for computer programs applicable to single rail vehi...
2009-08-05
Freight Rail Security Grant Program ...............................................................................6 Intercity Passenger Rail Program...Amtrak) .....................................................................6 Intercity Bus Security Grant Program...overview- fy2009.pdf. 19 Additionally Amtrak is eligible to receive funding to continue security enhancements for its intercity rail services
DOT National Transportation Integrated Search
1975-02-01
A methodology and a computer program, DYNALIST II, have been developed for computing the response of rail vehicle systems to sinusoidal or stationary random rail irregularities. The computer program represents an extension of the earlier DYNALIST pro...
49 CFR 266.9 - Federal/State share.
Code of Federal Regulations, 2010 CFR
2010-10-01
... salaries for State public employees working in the State Rail Service Assistance Program, shall be... of the objectives of the Rail Service Assistance Program; (iii) Be provided for in the approved grant... Rail Service Assistance Program is 80 percent, with the exception that the Federal share of payments to...
DOT National Transportation Integrated Search
1975-02-01
A methodology and a computer program, DYNALIST II, have been developed for computing the response of rail vehicle systems to sinusoidal or stationary random rail irregularities. The computer program represents an extension of the earlier DYNALIST pro...
National University Rail Transportation Center : Tier 1 : final report.
DOT National Transportation Integrated Search
2016-10-17
This project was a collaborative effort between Michigan Techs Rail Transportation Program (RTP), a member of the National University Rail Center (NURail) and the Michigan Dept of Transportation (MDOT), Office of Rail to advance rail transportatio...
2010-04-30
5 Intercity Bus Security Grant Program...eligibility.22 This grant program includes funding for the Freight Rail Security Grant Program (FRSGP), and the Intercity Passenger Rail Program (IPR...eligible to receive funding to continue security enhancements for its intercity rail services between high-risk urban areas. 21 U.S. Department of
Bibliography on the Design and Performance of Rail Track Structures
DOT National Transportation Integrated Search
1974-01-01
This bibliography was prepared as part of the Rail Supporting Technology Program being sponsored by the Rail Programs Branch of the Urban Mass Transportation Administration. It is based on the reference material that was used to evaluate the technica...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-14
... the Chicago, IL to St. Louis, MO High Speed Rail Program Corridor AGENCY: Federal Railroad... (EIS) for the Chicago, IL to St. Louis, MO High Speed Rail Corridor Program in compliance with the... Joliet and St. Louis to support additional passenger trains. The EIS will consider increasing the number...
Excitation of Surface Electromagnetic Waves on Railroad Rail
DOT National Transportation Integrated Search
1978-03-31
UMTA's Office of Rail Technology research programs aim to improve urban rail transportation systems safety. This rail-transit research study attempts to develop an onboard, separate and independent obstacle-detection system--Surface Electromagnetic W...
49 CFR 659.27 - Internal safety and security reviews.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the..., indicating that the rail transit agency is in compliance with its system safety program plan and system... security reviews indicate that the rail transit agency is not in compliance with its system safety program...
Urban Rail Noise Abatement Program : A Description
DOT National Transportation Integrated Search
1980-03-01
This report presents the background, current activities, and future plans for the Urban Rail Noise Abatement Program. This program, sponsored by the Office of Technology Development and Deployment of the Urban Mass Transportation Administration (UMTA...
Urban Rail Supporting Technology Program Fiscal Year 1975 - Year End Summary
DOT National Transportation Integrated Search
1975-12-01
The Urban Rail Supporting Technology Program is described for the 1975 fiscal year period. Important areas include program management, technical support and applications engineering, facilities development, test and evaluation, and technology develop...
Urban Rail Supporting Technology Program - Fiscal Year 1973 - Year-End Summary
DOT National Transportation Integrated Search
1974-01-01
The Urban Rail Supporting Technology Program, being conducted for the Department of Transportation Urban Mass Transportation Administration (UMTA) is described for the 1973 Fiscal Year period. Major areas covered include program management, technical...
DOT National Transportation Integrated Search
1975-12-01
Frequency domain computer programs developed or acquired by TSC for the analysis of rail vehicle dynamics are described in two volumes. Volume 2 contains program listings including subroutines for the four TSC frequency domain programs described in V...
Summer Youth Program in Rail and Intermodal Transportation.
DOT National Transportation Integrated Search
2016-02-22
For the past five years, Michigan Technological University has been running a Summer Youth Program (SYP) in Rail and Intermodal Transportation. The program has seen continuous growth along with a diverse group of students, grades 9-11. The structure ...
Chicago to Iowa City passenger rail : project financial plan.
DOT National Transportation Integrated Search
2009-09-01
The Chicago to Iowa City Intercity Passenger Rail Program (Program) is a joint : undertaking of the Iowa Department of Transportation (Iowa DOT) and the Illinois : Department of Transportation (Illinois DOT). The purpose of the Program is to reestabl...
UMTA Rail Transit EMI/EMC Program : An Overview and Summary
DOT National Transportation Integrated Search
1987-02-01
This report gives a history of the UMTA Rail Transit Electromagnetic Interference and Electromagnetic Compatibility (EMI/EMC) program, together with a listing of significant achievements over the life of the program. This is the lead volume of a nine...
Code of Federal Regulations, 2010 CFR
... 49 U.S.C. United States Code, 2009 Edition Title 49 - TRANSPORTATION SUBTITLE V - RAIL PROGRAMS PART B - ASSISTANCE CHAPTER 227 - STATE RAIL PLANS Sec. 22705 - Content §22705. Content (a) In General .—Each State rail plan shall, at a minimum, contain the following: (1) An inventory of the existing overall rail transportation system an...
Code of Federal Regulations, 2010 CFR
... 49 U.S.C. United States Code, 2011 Edition Title 49 - TRANSPORTATION SUBTITLE V - RAIL PROGRAMS PART B - ASSISTANCE CHAPTER 227 - STATE RAIL PLANS Sec. 22705 - Content §22705. Content (a) In General .—Each State rail plan shall, at a minimum, contain the following: (1) An inventory of the existing overall rail transportation system an...
Code of Federal Regulations, 2010 CFR
... 49 U.S.C. United States Code, 2014 Edition Title 49 - TRANSPORTATION SUBTITLE V - RAIL PROGRAMS PART B - ASSISTANCE CHAPTER 227 - STATE RAIL PLANS Sec. 22705 - Content §22705. Content (a) In General .—Each State rail plan shall, at a minimum, contain the following: (1) An inventory of the existing overall rail transportation system an...
DOT National Transportation Integrated Search
2000-01-01
The purpose of the Florida Rail System Plan is two-fold. First, it represents the rail : component of the Florida Transportation Plan (Agency Functional Plan) which, through an : annual series of policies, programs and projects, implements the Transp...
DOT National Transportation Integrated Search
2001-01-01
The 2000 North Carolina Rail Plan examines the need for assistance for shortline railroads and describes the railroad industry in North Carolina. It also provides a description of and information about current programs operated by the Rail Division, ...
Bibliography on Rail Technology
DOT National Transportation Integrated Search
1977-03-01
This rail technology review provides assistance to a number of rail technology programs initiated by the Transportation Systems Center (TSC) for the Federal Railroad Administration (FRA). The results of a search and review in four specific areas in t...
Rail Transit System Cost Study
DOT National Transportation Integrated Search
1977-01-01
The Transportation Systems Center serves as Systems Manager for the Rail Supporting Technology Program of the Urban Mass Transportation Administration. One task under this program has been to assess the cost of constructing, operating and maintaining...
Risk/benefit assessment of delayed action concept for rail inspection
DOT National Transportation Integrated Search
1999-02-01
A Monte Carlo simulation of certain aspects of rail inspection is presented. The simulation is used to investigate alternative practices in railroad rail inspection programs. Results are presented to compare the present practice of immediately repair...
49 CFR 659.15 - System safety program standard.
Code of Federal Regulations, 2011 CFR
2011-10-01
... included in the affected rail transit agency's system safety program plan relating to the hazard management... 49 Transportation 7 2011-10-01 2011-10-01 false System safety program standard. 659.15 Section 659... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the...
2009-06-08
Security Grant Program ...............................................................................6 Intercity Passenger Rail Program (Amtrak...6 Intercity Bus Security Grant Program...fy2009.pdf. 19 Additionally Amtrak is eligible to receive funding to continue security enhancements for its intercity rail services between high-risk
2009-04-21
6 Intercity Passenger Rail Program (Amtrak) .....................................................................6... Intercity Bus Security Grant Program..............................................................................7 Trucking Security Program...continue security enhancements for its intercity rail services between high-risk urban areas. 20 U.S. Department of Homeland Security, Federal Emergency
Rail commuter vehicle curving performance
DOT National Transportation Integrated Search
2002-04-01
This report presents results of a program to design and install a wayside wheel-rail force measurement system. The test site is capable of developing a set of measurements of lateral and vertical forces exerted between the wheel and the rail at caref...
Study on improving rail energy efficiency (E2) : best practices and strategies
DOT National Transportation Integrated Search
2015-03-23
A recent Volpe Center report [1] for the Federal Railroad Administrations (FRA) Rail Energy, Environment, and Engine (E3) Technology research and development program reviewed rail industry best practices (BPs) and strategies for improving energy e...
Evaluation of Education and Outreach Programs
DOT National Transportation Integrated Search
2011-12-01
Education and outreach are acknowledged, if only anecdotally, for contributing to an overall safer rail environment. The use of education and outreach programs as a means to improve highway-rail safety has expanded over the years since 1970 and the i...
Prediction and Control of Rail Transit Noise and Vibration - A State-of-the-Art Assessment
DOT National Transportation Integrated Search
1974-04-01
As systems manager for the Urban Mass Transportation Administration's Rail Supporting Technology Program, the Transportation Systems Center has undertaken research in rail transit noise abatement. As part of this effort, this report contains the resu...
Supplement to MTI study on selective passenger screening in the mass transit rail environment.
DOT National Transportation Integrated Search
2010-01-01
This supplement updates and adds to MTIs 2007 report on Selective Screening of Rail Passengers (Jenkins and Butterworth MTI 06-07: Selective Screening of Rail Passengers). The report reviews current screening programs implemented (or planned) by n...
FY 1998 Proposed Rail Improvement Program Supplement Update - Bloomington II
DOT National Transportation Integrated Search
1997-07-01
The purpose of this amendment to the FY 1998 Rail Improvement Program Supplement : is to present an analysis which has been formulated, using prescribed methodology, to assist in an investment decision concerning track rehabilitation and new track co...
FY 1998 Proposed Rail Improvement Program Supplement Update - Pontiac
DOT National Transportation Integrated Search
1997-07-01
The purpose of this amendment to the FY 1998 Rail Improvement Program Supplement is to present an analysis which has been formulated, using prescribed methodology, to assist in an investment decision concerning new track construction at the Prairie C...
Evaluation of education and outreach programs : research results.
DOT National Transportation Integrated Search
2011-12-01
"Education and outreach are acknowledged, if only anecdotally, for contributing to an overall safer rail environment. The use of education and outreach programs as a means to improve highway-rail safety has expanded over the years since 1970 and the ...
Vehicle postmortem and data analysis of a passenger rail car collision test
DOT National Transportation Integrated Search
2002-04-23
There is an ongoing research program in the United States to investigate and improve rail equipment crashworthiness. As part of this effort, a series of full-scale rail vehicle crash tests are being performed to investigate the crash response of exis...
Analysis of Wheel/Rail Force and Flange Force During Steady State Curving of Rigid Trucks
DOT National Transportation Integrated Search
1980-09-01
The wheel/rail dynamics interaction project being conducted as part of this program is directed toward reduction of maintenance costs and wheel/rail noise while providing acceptable ride quality and safety. This report describes the development of a ...
Algorithms and Parametric Studies for Assessing Effects of Two-Point Contact
DOT National Transportation Integrated Search
1984-02-01
This report describes analyses conducted to assess the effects of two-point wheel rail contact on a single wheel on the prediction of wheel-rail forces, and for including these effects in a computer program for predicting curving behavior of rail veh...
Study of State Programs for Rail-Highway Grade Crossing Improvements
DOT National Transportation Integrated Search
1978-02-01
In response to a DOT study of rail-highway grade crossing safety in the United States, the Congress passed the Highway Safety Act of 1973 which earmarked funds specifically for grade crossing improvements. Law requires the states to establish program...
DOT National Transportation Integrated Search
2013-08-01
NURail hosted an REU Summer Program in Multimodal Freight Transportation Risk at the Rail Transportation and Engineering Center (RailTEC) in the Department of Civil and Environmental Engineering at the University of Illinois at Urbana-Champaign (UIUC...
Installation of Existing Lift Systems for the Handicapped on Light Rail Vehicles
DOT National Transportation Integrated Search
1985-05-01
This report documents the results of a three-phase program to install an existing transit bus wheelchair lift system on a Boeing Light Rail Vehicle (LRV). Program activities included a review of lift requirements, evaluation of existing lift systems,...
DOT National Transportation Integrated Search
2014-11-01
The Federal Railroad Administration (FRA), U.S. Department of Transportation (U.S. DOT), is sponsoring a research program, which includes investigation of the applicability of time-based egress performance requirements to U.S. passenger rail cars. Th...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-21
... light of the DOT's strategic goals (safety, reduced congestion, global connectivity, environmental... issues, and Provide national estimates of transportation mode usage. Each version of the OHS will focus... owned vehicle; Taxi; Rail transit (subway, streetcar, or light rail); Commuter rail; Water...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-25
... Technology Program is a newly authorized program under the Rail Safety Improvement Act of 2008 (RSIA) (Pub. L. 110-432; October 16, 2008). The program was directed by Congress and passed into law in the aftermath... the Nation's attention to rail safety and the possibility that new technologies, such as PTC, could...
2009-02-26
6 Intercity Passenger Rail Program (Amtrak...6 Intercity Bus Security Grant Program................................................................................. 7...for its intercity rail services between high-risk urban areas. 20 U.S. Department of Homeland Security, Federal Emergency Management Agency
DOT National Transportation Integrated Search
1976-07-01
The Federal Railroad Administration (FRA) is sponsoring research, development, and demonstration programs to provide improved safety, performance, speed, reliability, and maintainability of rail transportation systems at reduced life-cycle costs. A m...
DOT National Transportation Integrated Search
2015-05-01
Los Angeles is pursuing possibly the most ambitious rail transit investment program in the nation with plans to open six new : rail transit lines between now and 2019. The report provides policy makes and planners a better understanding of the potent...
DOT National Transportation Integrated Search
2001-12-01
In 1997, the ITS Joint Program Office (JPO) at the Federal Highway Administration commissioned a study to identify projects being conducted in the U.S. that used Intelligent Transportation Systems (ITS) at highway-rail grade crossings, including not ...
Sleeve Expansion of Bolt Holes in Railroad Rail : Volume I, Description and Planning
DOT National Transportation Integrated Search
1980-02-01
The most predominant failure mode of rails with bolt joints is a web crack initiating at the rail bolt hole. This failure mode is of a classical fatigue nature induced by web stress concentration around the bolt hole. This program was conducted to ap...
DOT National Transportation Integrated Search
2000-01-19
This document serves as the proceedings form an evaluation workshop that focused on Intelligent Transportation Systems (ITS) applications at highway and rail crossings. Reports delivered contain information from seven U.S. sites where ITS technologie...
DOT National Transportation Integrated Search
2000-03-01
A test in which a single rail passenger car was crashed into a fixed wall at 35 mph was conducted at the Transportation Technology Center on November 16, 1999. The car was instrumented to measure (1) the deformations of critical structural elements, ...
78 FR 30828 - Rail Vehicles Access Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-23
..., Division of Rail Center for Inclusive Design and Environmental Access Community Transportation Association of America Disability Rights Education & Defense Fund Hearing Access Program International Centre for...
Plans for crash-tested bridge railings for longitudinal wood decks on low-volume roads
Michael A. Ritter; Ronald K. Faller; Steve Bunnell; Paula D. Hilbrich Lee; Barry T. Rosson
1998-01-01
The plans for crashworthy bridge railings for low-volume roads were developed through a cooperative research program involving the USDA Forest Service, Forest Products Laboratory (FPL); the Midwest Roadside Safety Facility, University of Nebraska-Lincoln (MwRSF); and the Forest Service, National Forest System, Engineering. Three railings were developed and successfully...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boyle, J.D.; Fort, E. Joseph; Lorenz, William
2013-07-01
Rail-cars loaded with radioactive materials must be closed and fastened to comply with United States Department of Transportation (DOT) requirements before they shipped. Securing waste shipments in a manner that meets these regulations typically results in the use of a sealable rail-car liner. Workers accessing the tops of the 2.74 m high rail-cars to seal and inspect liners for compliance prior to shipment may be exposed to a fall hazard. Relatively recent revisions to the Fall Protection requirements in the Safety and Health Requirements Manual (EM385-1-1, U.S. Army Corps of Engineers) have necessitated modifications to the fall protection systems previouslymore » employed for rail-car loading at Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. In response these projects have developed site-specific procedures to protect workers and maintain compliance with the improved fall protection regulations. (authors)« less
78 FR 57447 - Environmental Impact Statement for the ACEforward
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-18
... intercity passenger rail capital investments and may provide financial assistance for the program, including...) has responsibility for providing Federal funding for intra-city commuter rail capital investments and...
Electric rail gun projectile acceleration to high velocity
NASA Technical Reports Server (NTRS)
Bauer, D. P.; Mccormick, T. J.; Barber, J. P.
1982-01-01
Electric rail accelerators are being investigated for application in electric propulsion systems. Several electric propulsion applications require that the rail accelerator be capable of launching projectiles at velocities above 10 km/s. An experimental program was conducted to develop rail accelerator technology for high velocity projectile launch. Several 6 mm bore, 3 m long rail accelerators were fabricated. Projectiles with a mass of 0.2 g were accelerated by plasmas, carrying currents up to 150 kA. Experimental design and results are described. Results indicate that the accelerator performed as predicted for a fraction of the total projectile acceleration. The disparity between predicted and measured results are discussed.
49 CFR 659.25 - Annual review of system safety program plan and system security plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the rail...
Railway project design and construction (CEE 411) course updates.
DOT National Transportation Integrated Search
2017-01-20
Course CEE 411 "Railway Project Design and Construction" is a cornerstone of the railway : engineering education program developed by the Rail Transportation and Engineering Center : (RailTEC) at the University of Illinois at Urbana-Champaign (UIUC)....
FRA methods and approaches in environmental analysis and critical NEPA procedures
DOT National Transportation Integrated Search
2017-01-27
The Federal Railroad Administration hosted the third FRA Rail Program Delivery Meetinga 2.5-day conference for grantees, railroad representatives, federal oversight contractors, and staff, focused on rail project implementation. Below is a list of...
Best practices and strategies for improving rail energy efficiency
DOT National Transportation Integrated Search
2014-01-28
In support of the FRA Energy, Environment, and Engine (E3) program, this study reviews and evaluates technology development opportunities, equipment upgrades, and best practices (BPs) of international and U.S. passenger and freight rail industry segm...
Implementation Guidelines for State Safety Oversight of Rail Fixed Guideway Systems
DOT National Transportation Integrated Search
1996-06-01
These guidelines will assist states, oversight agencies, and rail transit agencies in developing safety and security programs to satisfy the requirements of the Federal Transit Administration (FTA). These requirements were published in the Federal Re...
On-line high-speed rail defect detection, phase III : research results.
DOT National Transportation Integrated Search
2005-10-01
The Federal Railroad Administration (FRA) Office of Research and Developments Track and Structures Program sponsored a study for developing and testing a rail defect detection system based on ultrasonic guided waves and non-contact probing. Curren...
Rail Transit System Maintenance Practices for Automatic Fare Collection Equipment
DOT National Transportation Integrated Search
1984-05-01
A review of rail transit system maintenance practices for automatic fare collection (AFC) equipment was performed. This study supports an UMTA sponsored program to improve the reliability of AFC equipment. The maintenance practices of the transit sys...
Quasi-Static and Dynamic Sled Testing of Prototype Commuter Rail Passenger Seats
DOT National Transportation Integrated Search
2008-04-22
In support of the Federal Railroad Administration?s (FRA) Railroad Equipment Safety Program, tests have been conducted on prototype commuter rail passenger seats which have been designed for improved occupant protection during commuter train accident...
South Carolina southeast high speed rail corridor improvement study
DOT National Transportation Integrated Search
2001-02-01
The Southeast Rail Corridor was originally designated as a high-speed corridor in Section 1010 of the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. More specifically, it involved the high-speed grade-crossing improvement program o...
Development of university-industry partnerships in railroad engineering education
NASA Astrophysics Data System (ADS)
Lautala, Pasi T.
Rail transportation has been an important part of the North American transportation network since the 19th century and it continues to be a major contributor to the economic well-being and the global competitiveness of the U.S. The recent expansion in freight rail volumes and forecasts for continuous growth, together with more favorable attitudes for urban passenger rail present several challenges for the rail industry. One of the challenges is the availability of a well educated engineering workforce. The rail industry has recognized a need to attract new railroad professionals from various disciplines for management and technical positions, but most universities eliminated railroad engineering from their curricula after the recruitment levels faded several decades ago. Today, railroad expertise and related engineering courses exist at only a few universities and most students graduate without any exposure to rail topics. While industry representatives have expressed their concern about a future workforce, little data is available on the extent of the demand, on the characteristics and skills of preferred candidates, and on the role that universities can play. A benchmarking study was undertaken to investigate the demand for university engineering graduates and assess whether current methods are sufficient to attract, educate, recruit, train and retain engineering students in the railroad profession. Data was collected from industry human resources and training managers to define the quantitative and qualitative needs for railroad engineers. In addition, recently hired engineers working in the rail industry were surveyed to determine the extent of their university exposure in rail topics and how it affected their career choice. The surveys indicated an increase of over 300 percent in the annual recruitment for railroad engineers by the participating companies between 2002 and 2005. Recruitment levels are expected to remain high for the next five to ten years due to high demand for rail transportation and an older engineering workforce with the greatest demand for civil, electrical and mechanical engineers with bachelor's degrees. The rail industry and universities have grown apart over the past several decades, as rail programs and courses were abandoned at universities and there were very limited recruitment and research activities by the railroads at universities. Today, specialized course(s) in rail topics are offered at approximately three percent of ABET accredited civil engineering programs in the U.S. and only 16 percent of engineers who responded to the survey had received university exposure to rail topics. The research findings suggest that increased university participation has the potential to assist the rail industry in all aspects related to attracting, educating, recruiting, training and retaining engineering graduates. The primary advantages would be greater industry visibility and student knowledge in rail topics. Increased prior knowledge, on the other hand, improves the effectiveness of industry training programs and offers a potential for sizable training cost reductions. As a final conclusion, the research suggests that the most effective approach for developing future railroad engineers is a balancing act where the responsibilities should be shared by the rail industry and universities based on each others strengths. University participation should include multiple types and levels, including introductory lectures, co-op/internship programs, courses in railroad engineering, and a minor or certificate in railroad engineering that would include several courses. Due to the urgent demand for railroad engineers and time it takes to rebuild the expertise on campuses, the development process should begin immediately, be incremental, and utilize concepts, such as cooperation with other universities or engineer-in-residence, that reduce the demand of internal university resources. The challenges to the process, such as willingness of partners to understand each others needs and motivations for the relationship should be alleviated by developing performance goals and measures of success. While it is impossible to evaluate all aspects of university level railroad engineering education in one study, this research suggests that there are opportunities for a partnership between the rail industry and universities. The purpose of this research was to identify those opportunities and increase the understanding of the forces that shape the demand for railroad engineers and engineering education. The findings can be used both by the rail industry and the universities as they initiate change in the current processes and thrive to develop railroad engineers to meet the demands of the 21 st century.
DOT National Transportation Integrated Search
1978-07-01
The Department of Transportation, Transportation Systems Center (TSC), is providing technical assistance to the Federal Railroad Administration (FRA) in a program to improve railroad safety and efficiency by providing a technological basis for improv...
Development of a TL-3 deep beam tubular backup bridge rail.
DOT National Transportation Integrated Search
2010-12-01
The objective of this study is to investigate the performance of the Ohio Department of Transportation (ODOT) Deep Beam bridge rail system per the National Cooperative Highway Research Program (NCHRP) Report 350 TL-3. Analytical study, computer simul...
Passenger rail two-car impact test. Volume 2 : summary of occupant protection program
DOT National Transportation Integrated Search
2002-01-01
Two full-scale impact tests of rail cars fitted with seat/occupant experiments were conducted at the Federal Railroad Administrations Transportation Technology Center located in Pueblo, Colorado. The first test was conducted on November 16, 1999, ...
Distribution and habitat use of king rails in the Illinois and Upper Mississippi River valleys
Darrah, Abigail J.; Krementz, David G.
2009-01-01
The migratory population of the king rail (Rallus elegans) has declined dramatically during the past 40 years, emphasizing the need to identify habitat requirements of this species to help guide conservation efforts. To assess distribution and habitat use of king rails along the Illinois and Upper Mississippi valleys, USA, we conducted repeated call-broadcast surveys at 83 locations in 2006 and 114 locations in 2007 distributed among 21 study sites. We detected king rails at 12 survey locations in 2006 and 14 locations in 2007, illustrating the limited distribution of king rails in this region. We found king rails concentrated at Clarence Cannon National Wildlife Refuge, an adjacent private Wetlands Reserve program site, and B. K. Leach Conservation Area, which were located in the Mississippi River floodplain in northeast Missouri. Using Program PRESENCE, we estimated detection probabilities and built models to identify habitat covariates that were important in king rail site occupancy. Habitat covariates included percentage of cover by tall (> 1 m) and short (<= 1 m) emergent vegetation, percentage of cover of woody vegetation, and interspersion of water and vegetation ( 2007 only) within 50 m of the survey location. Detection probability was 0.43 (SE = 0.12) in 2006 and 0.35 (SE = 0.03) in 2007 and was influenced by observer identity and percentage of cover by tall herbaceous vegetation. Site occupancy was 0.11 (SE = 0.04) in 2006 and 0.14 (SE = 0.04) in 2007 and was negatively influenced most by percentage of cover by woody vegetation. In addition, we found that interspersion of vegetation and water was positively related to occupancy in 2007. Thus, nesting king rails used wetlands that were characterized by high water-vegetation interspersion and little or no cover by woody vegetation. Our results suggest that biologists can improve king rail habitat by implementing management techniques that reduce woody cover and increase vegetation-water interspersion in wetlands.
76 FR 47296 - Transit Asset Management (TAM) Pilot Program Funds
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-04
... makes funds available for public transportation providers, State Departments of Transportation (DOT... transportation asset management at the nation's rail and bus public transportation agencies. FOR FURTHER... asset management at the rail and bus public transportation agencies. Transit Asset Management Selections...
U.S. Transit Track Restraining Rail. Volume II : Guidelines.
DOT National Transportation Integrated Search
1981-12-01
This report covers a study of restraining rails in transit track, which is part of the current research program of UMTA and was initiated: (1) to assist in the analysis, design, and maintenance and operation of transit track; (2) to compile guideline...
Experimental Investigation of Gauge Widening and Rail Restraint Characteristics
DOT National Transportation Integrated Search
1984-11-01
Gauge widening resulting from a loss of adequate rail restraint is one of the major track failure modes and the cause of a large number of derailments. A recent field and laboratory test program conducted by the Transportation Systems Center aimed at...
DOT National Transportation Integrated Search
1981-03-01
This project was conducted as part of UMTA's Rail Transit Fare Collection Program developed by the Transportation Systems Center of the U.S. Department of Transportation. The report presents a generalized survey methodology for conducting assessments...
A method for improved accuracy in three dimensions for determining wheel/rail contact points
NASA Astrophysics Data System (ADS)
Yang, Xinwen; Gu, Shaojie; Zhou, Shunhua; Zhou, Yu; Lian, Songliang
2015-11-01
Searching for the contact points between wheels and rails is important because these points represent the points of exerted contact forces. In order to obtain an accurate contact point and an in-depth description of the wheel/rail contact behaviours on a curved track or in a turnout, a method with improved accuracy in three dimensions is proposed to determine the contact points and the contact patches between the wheel and the rail when considering the effect of the yaw angle and the roll angle on the motion of the wheel set. The proposed method, with no need of the curve fitting of the wheel and rail profiles, can accurately, directly, and comprehensively determine the contact interface distances between the wheel and the rail. The range iteration algorithm is used to improve the computation efficiency and reduce the calculation required. The present computation method is applied for the analysis of the contact of rails of CHINA (CHN) 75 kg/m and wheel sets of wearing type tread of China's freight cars. In addition, it can be proved that the results of the proposed method are consistent with that of Kalker's program CONTACT, and the maximum deviation from the wheel/rail contact patch area of this two methods is approximately 5%. The proposed method, can also be used to investigate static wheel/rail contact. Some wheel/rail contact points and contact patch distributions are discussed and assessed, wheel and rail non-worn and worn profiles included.
DOT National Transportation Integrated Search
1978-09-01
This report documents comparisons between extensive rail freight service measurements (previously presented in Volume II) and simulations of the same operations using a sophisticated train performance calculator computer program. The comparisons cove...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-12
...'s strategic goals (safety, reduced congestion, global connectivity, environmental stewardship and..., as well as other governmental agencies, to survey the public about current transportation issues, and... transit (subway, streetcar, or light rail) Commuter rail Water transportation (taxis, ferries, ships...
DOT National Transportation Integrated Search
1980-06-01
As systems manager for the Urban Mass Transportation Administration (UMTA) Rail System Supporting Technology Program, the Transportation Systems Center (TSC) is conducting research and development efforts directed toward the introduction of improved ...
Transportation impacts of the Chicago River closure to prevent an asian carp infestation.
DOT National Transportation Integrated Search
2012-07-01
This project develops a simple linear programming model of the Upper Midwest regions rail transportation network to test : whether a closure of the Chicago River to freight traffic would impact the capacity constraint of the rail system. The result :...
Evaluation of Analytical and Experimental Methodologies for the Characterization of Wheel/Rail Loads
DOT National Transportation Integrated Search
1976-11-01
This report has been prepared as part of the Improved Track Structures Research Program sponsored by the Office of Rail Safety Research of the Federal Railroad Administration. The major modes of track degradation have been reviewed to identify the si...
Interactive electromagnetic launcher simulation
NASA Astrophysics Data System (ADS)
Young, F. J.; Howland, H. R.; Hughes, W. F.; Fikse, D. A.
1982-01-01
The mathematical model, usage, and documentation of an interactive computer simulation for an electromagnetic launcher is presented. The launcher is modeled as an electrical circuit. Three slight variations of the program permit studies of a launcher with (1) rail skin effects, (2) rail skin effects and approximated storage coil skin effects, or (3) neither of these effects. Usage of the program as currently implemented on the Westinghouse R&D Univac 1106 is described, with a sample session shown. The implementation of the program permits rapid scoping of the effects of parameter changes.
Conductive Interference in Rapid Transit Signaling Systems. Volume 1. Theory and Data.
DOT National Transportation Integrated Search
1985-11-01
The purpose of this report is to summarize the results of a comprehensive program that has been pursued to delineate all aspects of conductive interference (CI) in rail transit systems and to help avoid its effects in new rail transit systems. The re...
49 CFR 213.343 - Continuous welded rail (CWR).
Code of Federal Regulations, 2012 CFR
2012-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRACK SAFETY STANDARDS Train Operations at Track Classes 6 and... and inspection of CWR, and a training program for the application of those procedures, which shall be... located; and (2) De-stressing procedures/methods which address proper attainment of the desired rail...
49 CFR 213.343 - Continuous welded rail (CWR).
Code of Federal Regulations, 2013 CFR
2013-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRACK SAFETY STANDARDS Train Operations at Track Classes 6 and... and inspection of CWR, and a training program for the application of those procedures, which shall be... located; and (2) De-stressing procedures/methods which address proper attainment of the desired rail...
49 CFR 213.343 - Continuous welded rail (CWR).
Code of Federal Regulations, 2014 CFR
2014-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRACK SAFETY STANDARDS Train Operations at Track Classes 6 and... and inspection of CWR, and a training program for the application of those procedures, which shall be... located; and (2) De-stressing procedures/methods which address proper attainment of the desired rail...
U.S. Transit Track Restraining Rail. Volume I : Study of Requirements and Practices
DOT National Transportation Integrated Search
1981-12-01
This report covers a study of restraining rails in transit track, which is part of the current research program of UMTA and was initiated: (1) to assist in the analysis, design, and maintenance and operation of transit track; (2) to compile guideline...
DOT National Transportation Integrated Search
2000-08-01
The report describes a risk-based approach for assessing the implications of higher train speeds on highway-railroad grade crossing safety, and allocating limited resources to best reduce this risk. To predict accident frequency, an existing DOT mode...
78 FR 51810 - Agency Information Collection Activity Under OMB Review
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-21
... enables each SSO agency to monitor each rail transit agency's implementation of the State's requirements... Safety Oversight (SSO) agency to oversee the safety and security of each rail transit agency within the State's jurisdiction. To comply with Section 5330, SSO agencies must develop program standards which...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-02
... transportation system in light of the DOT's strategic goals (safety, reduced congestion, global connectivity... transportation issues, and provide national estimates of transportation mode usage. Each version of the OHS will... transit (subway, streetcar, or light rail) Commuter rail Water transportation (taxis, ferries, ships...
Noise Impact Inventory of Elevated Structures in U.S. Urban Rail Rapid Transit Systems
DOT National Transportation Integrated Search
1980-09-01
This report presents the results of the third task of a five-task program dealing with the reduction of noise from elevated structures in use in U.S. rail rapid transit systems. This report is an inventory and impact assessment of the noise radiated ...
Train-to-Train Impact Test of Crash-Energy Management Passenger Rail Equipment: Structural Results
DOT National Transportation Integrated Search
2006-01-01
On March 23, 2006, a full-scale test was conducted on a : passenger rail train retrofitted with newly developed cab end : and non-cab end crush zone designs. This test was conducted : as part of a larger testing program to establish the degree of : e...
Train-to-train impact test of crash energy management passenger rail equipment.
DOT National Transportation Integrated Search
2007-02-01
On March 23, 2006, a full-scale test was conducted on a passenger rail train retrofitted with newly developed cab and coach car crush zone designs. This test was conducted as part of a larger testing program to establish the degree of enhanced perfor...
Rail accelerators for space transportation: An experimental investigation
NASA Technical Reports Server (NTRS)
Zana, L. M.; Kerslake, W. R.; Sturman, J. L.
1986-01-01
An experimental program was conducted at the Lewis Research Center with the objective of investigating the technical feasibility of rail accelerators for propulsion applications. Single-stage, plasma driven rail accelerators of small (4 by 6 mm) and medium (12.5 by 12.5 mm) bores were tested at peak accelerating currents of 50 to 450 kA. Streak-camera photography was used to provide a qualitative description of plasma armature acceleration. The effects of plasma blowby and varying bore pressure on the behavior of plasma armatures were studied.
Rail accelerator technology and applications
NASA Technical Reports Server (NTRS)
Zana, L. M.; Kerslake, W. R.
1985-01-01
Rail accelerators offer a viable means of launching ton-size payloads from the Earth's surface to space. The results of two mission studies which indicate that an Earth-to-Space Rail Launcher (ESRL) system is not only technically feasible but also economically beneficial, particularly when large amounts of bulk cago are to be delivered to space are given. An in-house experimental program at the Lewis Research Center (LeRC) was conducted in parallel with the mission studies with the objective of examining technical feasibility issues. A 1 m long - 12.5 by 12.5 mm bore rail accelerator as designed with clear polycarbonate sidewalls to visually observe the plasma armature acceleration. The general character of plasma/projectile dynamics is described for a typical test firing.
NASA Astrophysics Data System (ADS)
Eastham, A. R.; Katz, R. M.
1980-09-01
Two test programs have been conducted to evaluate the performance of a single-sided linear induction motor with a squirrel-cage reaction rail and with a solid steel reaction rail. A 1.73-m-long six-pole stator interacted with the rails mounted on the rim of a 7.6-m-diam wheel. A 64-channel data acquisition system allowed tests to be performed over a wide range of operating conditions at speeds up to 20 m/sec. Typical test results which compare and contrast the mechanical, electrical and magnetic behavior of the SLIMs are presented. The test data are being used to assess the SLIM as an integrated suspension/propulsion system and for other transportation applications.
DOT National Transportation Integrated Search
2013-04-01
This report covers the work performed under the FRA High-Speed BAA 20102011 program to demonstrate the technology of ultrasonic tomography for 3-D imaging of internal rail flaws. There is a need to develop new technologies that are able to quantif...
Railroad safety program, task 2
NASA Technical Reports Server (NTRS)
1983-01-01
Aspects of railroad safety and the preparation of a National Inspection Plan (NIP) for rail safety improvement are examined. Methodology for the allocation of inspection resources, preparation of a NIP instruction manual, and recommendations for future NIP, are described. A statistical analysis of regional rail accidents is presented with causes and suggested preventive measures included.
Geography by Rail®: A New Twist on a Romantic Concept
ERIC Educational Resources Information Center
Allen, Casey D.; Barbour, Jon M.
2016-01-01
Based on William Morris Davis' great Transcontinental Excursion of 1912, this article assesses and reviews the Geography by Rail® program (GbR)--a unique, short-term, field-based study abroad experience that takes an uncommon-in-the-US approach to international exploration and fieldwork, incorporating on-the-ground, regional geography-based…
Blaz, Jacquelyn W; Pearce, Patricia F
2009-01-01
The world is becoming increasingly web-based. Health care institutions are utilizing the web for personal health records, surveillance, communication, and education; health care researchers are finding value in using the web for research subject recruitment, data collection, and follow-up. Programming languages, such as Java, require knowledge and experience usually found only in software engineers and consultants. The purpose of this paper is to demonstrate Ruby on Rails as a feasible alternative for programming questionnaires for use on the web. Ruby on Rails was specifically designed for the development, deployment, and maintenance of database-backed web applications. It is flexible, customizable, and easy to learn. With a relatively little initial training, a novice programmer can create a robust web application in a small amount of time, without the need of a software consultant. The translation of the Children's Computerized Physical Activity Reporter (C-CPAR) from a local installation in Microsoft Access to a web-based format utilizing Ruby on Rails is given as an example.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-29
... program of financial assistance to the rail industry in the form of loans and loan guarantees and other..., 2005 (70 FR 56207) and provides policy guidance. The public has an interest in how federal funds are... following: Reduce the consumption of fossil fuels and otherwise improve energy efficiency of rail operations...
Public transit research: Rail, bus, and new technology, 1991. Transportation Research Record
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kassabian, N.C.; Tobias, A.G.; Crayton, L.
1991-01-01
The report contains: Image of Rail Transit; Train Operations Computer Simulation Case Study: Single-Tracking Operations for Philadelphia's Market-Frankford Subway Elevated Rail Rapid Transit Line; Transit Railcar Quantities: Scale Economies; Evaluation of Training Programs in Rail Transit: Its Role and Status; Methodology for Evaluating Out-of-Direction Bus Route Segments; Integration of Fixed- and Flexible-Route Bus Systems; Downtown Space for Buses--The Manhattan Experience; Implications of Transit Drug Testing and Maintenance Service Procurement for Small Urban and Rural Systems; Challenges for Integration of Alternative Fuels in the Transit Industry; Short History of the Transbay Transit Terminal and the Relocation of the San Francisco Greyhoundmore » Depot Thereto; Airport Development with Automated People Mover Systems; Review of Four Alternative Airport Terminal Passenger Mobility Systems.« less
Transit Reliability Information Program (TRIP) : Final Technical Report
DOT National Transportation Integrated Search
1984-05-01
The Transit Reliability Information Program (TRIP) is a government-initiated program to assist the transit industry in satisfying its need for rail transit car subsystem reliability information. TRIP provided this assistance through the operation of ...
MBTA Green Line Tests - Riverside Line, December 1972 : Volume 1. Description.
DOT National Transportation Integrated Search
1973-09-01
The Urban Rail Supporting Technology Program emphasizes three major task areas; facilities development, technology development, and test program development. The test program development is composed of three sub-areas; vehicle testing, ways and struc...
MBTA Green Line Tests - Riverside Line, December 1972 : Volume 5. Gage Computer Printout.
DOT National Transportation Integrated Search
1973-01-01
The Urban Rail Supporting Technology Program emphasizes three major task areas; facilities development, technology development, and test program development. The test program development is composed of three sub-areas; vehicle testing, ways and struc...
MBTA Green Line Tests - Riverside Line, December 1972 : Volume 4. Westbound Track Profile.
DOT National Transportation Integrated Search
1973-01-01
The Urban Rail Supporting Technology Program emphasizes three major task areas; facilities development, technology development, and test program development. The test program development is composed of three sub-areas; vehicle testing, ways and struc...
MBTA Green Line Tests - Riverside Line, December 1972 : Volume 3. Eastbound Track Profile.
DOT National Transportation Integrated Search
1973-01-01
The Urban Rail Supporting Technology Program emphasizes three major task areas; facilities development, technology development, and test program development. The test program development is composed of three sub-areas; vehicle testing, ways and struc...
NASA Astrophysics Data System (ADS)
Swarner, Benjamin R.
Sound Transit plans to extend its current light rail system, which runs along the I-5 corridor in Seattle, Washington, across the I-90 Homer Hadley floating bridge as part of a project to connect the major city centers in the region. But, no light rail has ever crossed a floating bridge due to several unique engineering challenges. One of these challenges is attaching the rails to the existing bridge deck without drilling into the bridge pontoons. This research program was developed to test and analyze a direct fixation method that uses lightweight concrete plinths and an elastomer-epoxy system to attach the rails to the bridge deck. The elastomer used was a two-part, pourable elastomer with cork particles intermixed to alter the mechanical properties of the material. A lightweight concrete mixture was analyzed for use in the plinths, and system tests investigated the system response under tensile, compressive and shear loading. The shear response of the system was examined further under varying loading conditions including different surface preparations, elastomer thicknesses, strain-rates and after freeze-thaw conditioning. Experimental data was examined for trends based on these parameters to best characterize the system, and the elastomer was evaluated in the context of modern elastomer research.
Urban Rail Supporting Technology Program Fiscal Year 1974 Year End Summary
DOT National Transportation Integrated Search
1975-03-01
Major areas include program management, technical support and application engineering, facilities development, test and evaluation, and technology development. Specific technical discussion includes track measurement systems; UMTA facilities developm...
DOT National Transportation Integrated Search
1981-08-01
The Transit Reliability Information Program (TRIP) is a government-initiated program to assist the transit industry in satisfying its need for transit reliability information. TRIP provides this assistance through the operation of a national Data Ban...
MBTA Green Line Tests - Riverside Line, December 1972 : Volume 2. Track Geometry Data Plots.
DOT National Transportation Integrated Search
1973-09-01
The Urban Rail Supporting Technology Program emphasizes three major task areas; facilities development, technology development, and test program development. The test program development is composed of three sub-areas; vehicle testing, ways and struc...
49 CFR 659.39 - Oversight agency reporting to the Federal Transit Administration.
Code of Federal Regulations, 2014 CFR
2014-10-01
... accidents, status of corrective actions, updates and modifications to rail transit agency program...-year safety review has been completed since the last annual report was submitted. (3) Program standard...
49 CFR 659.39 - Oversight agency reporting to the Federal Transit Administration.
Code of Federal Regulations, 2011 CFR
2011-10-01
... accidents, status of corrective actions, updates and modifications to rail transit agency program...-year safety review has been completed since the last annual report was submitted. (3) Program standard...
49 CFR 659.39 - Oversight agency reporting to the Federal Transit Administration.
Code of Federal Regulations, 2013 CFR
2013-10-01
... accidents, status of corrective actions, updates and modifications to rail transit agency program...-year safety review has been completed since the last annual report was submitted. (3) Program standard...
49 CFR 659.39 - Oversight agency reporting to the Federal Transit Administration.
Code of Federal Regulations, 2012 CFR
2012-10-01
... accidents, status of corrective actions, updates and modifications to rail transit agency program...-year safety review has been completed since the last annual report was submitted. (3) Program standard...
Environmental Impact Statement. Peacekeeper Rail Garrison Program. Volume 2. Public Comments
1989-02-01
Air Force has no plans to remove all birds from Whiteman AFB. However, to reduce the potential for collisions between greater prairie chickens and...aircraft, Whiteman AFB removed all prairie chickens from the base in early 1988 according to procedures established by the Missouri Department of...Department of Energy rejected the option of rail transport of transuranic waste from the Hanford Reservation to New Mexico on the grounds that the
Parametric study of track response
DOT National Transportation Integrated Search
1977-12-01
This report was prepared as part of the Improved Track Structures Research Program : managed by the Transportation Systems Center. This program is sponsored by the : Office of Rail Safety Research, Improved Track Structures Research Division, of : th...
User's Guide for the Interactive Scheduling Program : Preliminary Calendar Version
DOT National Transportation Integrated Search
1978-08-01
The Office of Transportation Management of the Urban Mass Transportation Administration (UMTA), in conjunction with the Transportation Systems Center (TSC), designed and developed the Interactive Scheduling Program (ISP) to assist rail-transit operat...
Track Geometry Development : UMTA Urban Rail Supporting Technology Program
DOT National Transportation Integrated Search
1974-04-01
Measurement of transit system track geometry parameters, under normal operating conditions, is essential for planning and conducting an effective maintenance program. The pertinent parameters are profile, gage, alignment, and cross level. Present met...
76 FR 40320 - Risk Reduction Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-08
... identifying and analyzing applicable hazards and (2) develops plans to mitigate that risk. Each RRP is...-2009-0038] RIN 2130-AC11 Risk Reduction Program AGENCY: Federal Railroad Administration (FRA... certain railroads to develop a Risk Reduction Program (RRP). The Rail Safety Improvement Act of 2008...
Development of Revised Grade Crossing Hazard Index Model
DOT National Transportation Integrated Search
2017-07-01
The Nevada Department of Transportation (NDOT) plays a key role in addressing highway-rail grade crossing safety issues by allocating federal funding through the Railway-Highway Crossing (Section 1030) Program. This Program requires each state to sel...
49 CFR 266.3 - Rail Service Assistance Program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... construction assistance; (6) Planning assistance; and (7) Program operations assistance. (b) Special limitations on planning assistance and program operation assistance. (1) A State is eligible to receive up to $100,000, or 5 percent of its entitlement, whichever is greater, as planning assistance; and (2) A...
49 CFR 659.15 - System safety program standard.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false System safety program standard. 659.15 Section 659... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.15 System safety program standard. (a) General requirement. Each state...
Evaluation of the Transit Reliability Information Program
DOT National Transportation Integrated Search
1982-06-01
This report presents an evaluation of the rail portion of the Transit Reliability Information Program (TRIP), which was designed to collect and analyze equipment reliability data on U.S. transit systems. This assessment was conducted at the end of it...
Highway and rail transit tunnel maintenance and rehabilitation manual
DOT National Transportation Integrated Search
2000-04-01
This report presents the evaluation results of the Phoenix, Arizona Metropolitan Model Deployment Initiative (MMDI). The MMDI was a three-year program of the Intelligent Transportation Systems (ITS) Joint Program Office of the U.S. Department of Tran...
Wood tie track resistance characterization and correlations study
DOT National Transportation Integrated Search
1995-01-01
The work presented here is part of a major program to evaluate lateral buckling of continuous welded rail (CWR) tracks. The program to develop the technical information to support safety guidelines and specifications for track buckling prevention is ...
49 CFR 659.19 - System safety program plan: contents.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 7 2012-10-01 2012-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...
49 CFR 659.19 - System safety program plan: contents.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 7 2011-10-01 2011-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...
49 CFR 659.19 - System safety program plan: contents.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 7 2013-10-01 2013-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...
49 CFR 659.19 - System safety program plan: contents.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 7 2014-10-01 2014-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...
49 CFR 659.19 - System safety program plan: contents.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...
DOT National Transportation Integrated Search
1976-07-01
Several new capabilities have been added to the DYNALIST II computer program. These include: (1) a component matrix generator that operates as a 3-D finite element modeling program where elements consist of rigid bodies, flexural bodies, wheelsets, s...
Management of Urban Construction Programs. Volume II : Supplemental Information
DOT National Transportation Integrated Search
1981-06-01
This report is part of a program sponsored by the Office of Rail and Construction Technology of the Urban Mass Transportation Administration. The overall objective of the study is to develop guidelines that can be used by local government authorities...
Foin, Theodore C.; Garcia, E. Jacqueline; Gill, Robert E.; Culberson, Steven D.; Collins, Joshua N.
1997-01-01
The California clapper rail (Rallus longirostris obsoletus), a Federal- and State-listed endangered marsh bird, has a geographic range restricted to one of the most heavily-urbanized estuaries in the world. The rail population has long been in a state of decline, although the exact contribution of each of the many contributing causes remains unclear. The rail is one of the key targets of emerging plans to conserve and restore tidal marshlands. Reduction of tidal marsh habitat, estimated at 85–95%, has been the major historical cause of rail decline. Increased predation intensity may be the more important present problem, because habitat fragmentation and alteration coupled with the invasion of the red fox have made the remaining populations more vulnerable to predators. Population viability analysis shows that adult survivorship is the key demographic variable; reversals in population fate occur over a narrow range of ecologically realistic values. Analysis of habitat requirements and population dynamics of the clapper rail in the San Francisco Estuary shows that decreased within-marsh habitat quality, particularly reduction of tidal flows and alteration of drainage, is an important barrier to population recovery. Management and restoration activities should emphasize the development of well-channelized high tidal marsh, because this is the key requirement of rail habitat. Developing effective restoration programs depends upon having information that field research will not provide. The effect of spatial pattern of reserves requires accurate estimation of the effects of prédation and inter-marsh movement, both of which are practically impossible to measure adequately. It will be necessary to develop and use simulation models that can be applied to geographic data to accomplish this task.
Modeling and Simulating Passenger Behavior for a Station Closure in a Rail Transit Network
Yin, Haodong; Han, Baoming; Li, Dewei; Wu, Jianjun; Sun, Huijun
2016-01-01
A station closure is an abnormal operational situation in which the entrances or exits of a rail transit station have to be closed for some time due to an unexpected incident. A novel approach is developed to estimate the impacts of the alternative station closure scenarios on both passenger behavioral choices at the individual level and passenger demand at the disaggregate level in a rail transit network. Therefore, the contributions of this study are two-fold: (1) A basic passenger behavior optimization model is mathematically constructed based on 0–1 integer programming to describe passengers’ responses to alternative origin station closure scenarios and destination station closure scenarios; this model also considers the availability of multi-mode transportation and the uncertain duration of the station closure; (2) An integrated solution algorithm based on the passenger simulation is developed to solve the proposed model and to estimate the effects of a station closure on passenger demand in a rail transit network. Furthermore, 13 groups of numerical experiments based on the Beijing rail transit network are performed as case studies with 2,074,267 records of smart card data. The comparisons of the model outputs and the manual survey show that the accuracy of our proposed behavior optimization model is approximately 80%. The results also show that our model can be used to capture the passenger behavior and to quantitatively estimate the effects of alternative closure scenarios on passenger flow demand for the rail transit network. Moreover, the closure duration and its overestimation greatly influence the individual behavioral choices of the affected passengers and the passenger demand. Furthermore, if the rail transit operator can more accurately estimate the closure duration (namely, as g approaches 1), the impact of the closure can be somewhat mitigated. PMID:27935963
Modeling and Simulating Passenger Behavior for a Station Closure in a Rail Transit Network.
Yin, Haodong; Han, Baoming; Li, Dewei; Wu, Jianjun; Sun, Huijun
2016-01-01
A station closure is an abnormal operational situation in which the entrances or exits of a rail transit station have to be closed for some time due to an unexpected incident. A novel approach is developed to estimate the impacts of the alternative station closure scenarios on both passenger behavioral choices at the individual level and passenger demand at the disaggregate level in a rail transit network. Therefore, the contributions of this study are two-fold: (1) A basic passenger behavior optimization model is mathematically constructed based on 0-1 integer programming to describe passengers' responses to alternative origin station closure scenarios and destination station closure scenarios; this model also considers the availability of multi-mode transportation and the uncertain duration of the station closure; (2) An integrated solution algorithm based on the passenger simulation is developed to solve the proposed model and to estimate the effects of a station closure on passenger demand in a rail transit network. Furthermore, 13 groups of numerical experiments based on the Beijing rail transit network are performed as case studies with 2,074,267 records of smart card data. The comparisons of the model outputs and the manual survey show that the accuracy of our proposed behavior optimization model is approximately 80%. The results also show that our model can be used to capture the passenger behavior and to quantitatively estimate the effects of alternative closure scenarios on passenger flow demand for the rail transit network. Moreover, the closure duration and its overestimation greatly influence the individual behavioral choices of the affected passengers and the passenger demand. Furthermore, if the rail transit operator can more accurately estimate the closure duration (namely, as g approaches 1), the impact of the closure can be somewhat mitigated.
Mass transit : FTA could relieve New Starts program funding constraints
DOT National Transportation Integrated Search
2001-08-01
The Transportation Equity Act for the 21st Century (TEA-21) authorized $6 billion in "guaranteed" funding for the New Starts program (full funding grant agreements to help pay certain rail, bus, and trolley projects) through fiscal year 2003. The Fed...
DOT National Transportation Integrated Search
1976-05-01
As part of its activity under the Rail Equipment Safety Project, computer programs for track/train dynamics analysis are being developed and modified. As part of this effort, derailment behavior of trains negotiating curves under buff or draft has be...
NASA Astrophysics Data System (ADS)
Xu, Lei; Zhai, Wanming; Gao, Jianmin
2017-11-01
Track irregularities are inevitably in a process of stochastic evolution due to the uncertainty and continuity of wheel-rail interactions. For depicting the dynamic behaviours of vehicle-track coupling system caused by track random irregularities thoroughly, it is a necessity to develop a track irregularity probabilistic model to simulate rail surface irregularities with ergodic properties on amplitudes, wavelengths and probabilities, and to build a three-dimensional vehicle-track coupled model by properly considering the wheel-rail nonlinear contact mechanisms. In the present study, the vehicle-track coupled model is programmed by combining finite element method with wheel-rail coupling model firstly. Then, in light of the capability of power spectral density (PSD) in characterising amplitudes and wavelengths of stationary random signals, a track irregularity probabilistic model is presented to reveal and simulate the whole characteristics of track irregularity PSD. Finally, extended applications from three aspects, that is, extreme analysis, reliability analysis and response relationships between dynamic indices, are conducted to the evaluation and application of the proposed models.
The SmartWay® Program is public-private initiative between EPA, large and small trucking companies, rail carriers, logistics companies, commercial manufacturers, retailers, and other federal and state agencies.
78 FR 43263 - Paperless Hazard Communications Pilot Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-19
... Research Division (PHH-23), Pipeline and Hazardous Materials Safety Administration, 1200 New Jersey Avenue... materials by air, highway, rail, and water) to test the feasibility and then evaluate both the feasibility... times and locations.'' On September 12, 2001, the Research and Special Programs Administration (the...
Development of conventional passenger cab car end structure designs for full scale testing
DOT National Transportation Integrated Search
2006-12-01
The Volpe Center is supporting the Federal Railroad Administration's full-scale testing program to understand and improve rail vehicle cashworthiness. The objectie of one of the sets of tests in this program is determining the behavior of cab car end...
Optimal rail container shipment planning problem in multimodal transportation
NASA Astrophysics Data System (ADS)
Cao, Chengxuan; Gao, Ziyou; Li, Keping
2012-09-01
The optimal rail container shipment planning problem in multimodal transportation is studied in this article. The characteristics of the multi-period planning problem is presented and the problem is formulated as a large-scale 0-1 integer programming model, which maximizes the total profit generated by all freight bookings accepted in a multi-period planning horizon subject to the limited capacities. Two heuristic algorithms are proposed to obtain an approximate optimal solution of the problem. Finally, numerical experiments are conducted to demonstrate the proposed formulation and heuristic algorithms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... TRANSPORTATION IMPLEMENTATION OF PROGRAM FOR CAPITAL GRANTS FOR RAIL LINE RELOCATION AND IMPROVEMENT PROJECTS.... Quality of life means the level of social, environmental and economic satisfaction and well being a...
Measurement Plan for the Characterization of the Load Environment for Cross Ties and Fasteners
DOT National Transportation Integrated Search
1977-04-01
This report was prepared as a part of the Improved Track Structures Research Program sponsored by the Office of Rail Safety Research of the Federal Railroad Administration. The report is a planning document for a track measurement program to obtain d...
DOT National Transportation Integrated Search
1974-08-01
DYNALIST, a computer program that extracts complex eigenvalues and eigenvectors for dynamic systems described in terms of matrix equations of motion, has been acquired and made operational at TSC. In this report, simple dynamic systems are used to de...
DOT National Transportation Integrated Search
2009-08-01
The Oregon Legislature passed a law establishing the Multimodal Transportation Fund in 2005. The fund was part of what : became known as the ConnectOregon program, with the purpose of making public and private investments in aviation, : marine, rail,...
75 FR 79308 - Alcohol and Drug Testing: Determination of Minimum Random Testing Rates for 2011
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-20
... from Management Information System annual reports, FRA has determined that the 2009 rail industry... program data taken from FRA's Management Information System. Based on this data, the Administrator... effective December 20, 2010. FOR FURTHER INFORMATION CONTACT: Lamar Allen, Alcohol and Drug Program Manager...
Used fuel rail shock and vibration testing options analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ross, Steven B.; Best, Ralph E.; Klymyshyn, Nicholas A.
2014-09-25
The objective of the rail shock and vibration tests is to complete the framework needed to quantify loads of fuel assembly components that are necessary to guide materials research and establish a technical basis for review organizations such as the U.S. Nuclear Regulatory Commission (NRC). A significant body of experimental and numerical modeling data exists to quantify loads and failure limits applicable to normal conditions of transport (NCT) rail transport, but the data are based on assumptions that can only be verified through experimental testing. The test options presented in this report represent possible paths for acquiring the data thatmore » are needed to confirm the assumptions of previous work, validate modeling methods that will be needed for evaluating transported fuel on a case-by-case basis, and inform material test campaigns on the anticipated range of fuel loading. The ultimate goal of this testing is to close all of the existing knowledge gaps related to the loading of used fuel under NCT conditions and inform the experiments and analysis program on specific endpoints for their research. The options include tests that would use an actual railcar, surrogate assemblies, and real or simulated rail transportation casks. The railcar carrying the cradle, cask, and surrogate fuel assembly payload would be moved in a train operating over rail track modified or selected to impart shock and vibration forces that occur during normal rail transportation. Computer modeling would be used to help design surrogates that may be needed for a rail cask, a cask’s internal basket, and a transport cradle. The objective of the design of surrogate components would be to provide a test platform that effectively simulates responses to rail shock and vibration loads that would be exhibited by state-of-the-art rail cask, basket, and/or cradle structures. The computer models would also be used to help determine the placement of instrumentation (accelerometers and strain gauges) on the surrogate fuel assemblies, cask and cradle structures, and the railcar so that forces and deflections that would result in the greatest potential for damage to high burnup and long-cooled UNF can be determined. For purposes of this report we consider testing on controlled track when we have control of the track and speed to facilitate modeling.« less
Sims, Jr., James R.
2008-07-15
An electromagnetic propulsion system is disclosed having separate rails for ballistic guidance and for carrying current. In this system, one or more pairs of ballistic guidance rails are provided, with each ballistic guidance rail having a pair of current carrying rails joined to it to form a combined rail. Each combined rail is separated electrically from adjacent combined rails by electrically insulating blocks. Each of the current carrying rails in a given combined rail pair have the same electrical polarity, and the polarities alternate between adjacent combined rails. Armatures contact current carrying rails to complete the circuit to generate the accelerating Lorentz force on the armatures. Bore riders on the sabot and/or projectile are in contact with the ballistic guide rails. Separation of the current carrying and ballistic guidance functions increases resistance of the system to rail movement and bending, as well as reduced wear/damage to the rails. In further embodiments, a circumferential over wrap providing compressive force on the rails further increases resistance of the system to rail movement and bending.
Analysis of Energy Resources and Programs of the Soviet Union and Eastern Europe. Appendix B. Coal
1973-12-01
large ooaWlred electric po.or plant a major rail and river ^tion „1th rail and river connections to the Sea of Aaov and the Black Sea. the Caspian ...8217^ y 0r American coal deposits. The basi. _ _ ^ me oasic assumption * V. V. Strl8hkov,Coal industry of the nsmv Columbia UniversII771^^7...8217 ’K < ’ IISHCH loin T’l» • I’M 1 Is ciipnhl,, .,(• pro.lnc oT •’) me tern , • Rotnry excnvntora wi (h proc meters/hr
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-23
... Group, LLC, and RR Acquisition Holding, LLC--Control Exemption--Wellsboro & Corning Railroad, LLC Rail.... (RTC), RailTex, Inc. (RailTex), Fortress Investment Group, LLC (Fortress), and RR Acquisition Holding... acquire indirect control of the Wellsboro & Corning Railroad, LLC (W&C), a Class III rail carrier, through...
Evaluation of rail test frequencies using risk analysis
DOT National Transportation Integrated Search
2009-03-03
Several industries now use risk analysis to develop : inspection programs to ensure acceptable mechanical integrity : and reliability. These industries include nuclear and electric : power generation, oil refining, gas processing, onshore and : offsh...
76 FR 71119 - Agency Information Collection Activity Under OMB Review
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-16
.... Abstract: 49 U.S.C. 5330 requires States to designate a State Safety Oversight (SSO) agency to oversee the... 5330, SSO agencies must develop program standards which meet FTA's minimum requirements. In the Program Standard, which must be approved by FTA, each SSO agency must require each rail transit agency in the State...
Impact of the rail-pad multi-discrete model upon the prediction of the rail response
NASA Astrophysics Data System (ADS)
Mazilu, T.; Leu, M.
2017-08-01
Wheel/rail vibration has many technical effects such as wear of the rolling surfaces, rolling noise, settlement of the ballast and subgrade etc. This vibration is depending on the rail pad characteristic and subsequently, it is important to have an accurate overview on the relation between the rail pad characteristic and the level of the wheel/rail vibration. To this end, much theoretical and experimental research has been developed in the past, and for the theoretical approach the track model, in general, and, particularly, the rail pad model is of crucial importance. Usually, the rail pad model is discrete model one, neglecting the length of the rail pad. This fact is questionable because the sleepers span is only 4 times the rail pad length. Using the rail pad discrete model, the rail response is overestimated when the frequency of the excitation equals the pinned-pinned resonance frequency. In this paper, a multi-discrete model for the rail pad, consisting in many Kelvin-Voigt parallel systems, is inserted into an analytical model of the track. The track model is reduced to a rail taken as infinite Timoshenko beam, discretely supported via rail pad, sleeper and ballast. The influence of the number of Kelvin-Voigt systems of the rail pad model on the rail response is analysed.
Structure and Properties of Thermite Welds in Premium Rails
DOT National Transportation Integrated Search
1985-12-01
Thermite welds were used to join combinations of premium rails and AREA Controlled Cooled Carbon rails (i.e., standard rails). The premium rails comprised head-hardened rails and CrMo, CrV and Cr alloy rails. A major objective was to determine the fe...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-28
...., Palm Beach Holding, Inc., RailAmerica Transportation Corp., RailTex, Inc., Fortress Investment Group, LLC, and RR Acquisition Holding, LLC--Control Exemption--Marquette Rail, LLC AGENCY: Surface...), RailTex, Inc., Fortress Investment Group, LLC (Fortress), and RR Acquisition Holding, LLC (RR...
76 FR 58334 - Program for Capital Grants for Rail Line Relocation and Improvement Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-20
... regulations, disadvantaged business enterprises (DBE), debarment and suspension, drug-free workplace, FRA's... the estimated cost of office, shop, laboratory, safety equipment, etc. to be used at the facility, if...
Engineering Analysis of Stresses in Railroad Rails.
DOT National Transportation Integrated Search
1981-10-01
One portion of the Federal Railroad Administration's (FRA) Track Performance Improvement Program is the development of engineering and analytic techniques required for the design and maintenance of railroad track of increased integrity and safety. Un...
PennDOT : research annual report 1999-2000
DOT National Transportation Integrated Search
2000-01-01
The PENNDOT Research Annual Report contains three major sections: Research Program Highlights; Review of Projects; Financial Summary. New research initiatives have been undertaken in the areas of aviation and rail freight modes and in environmental q...
Rail transportation : Federal Railroad Administration's safety programs
DOT National Transportation Integrated Search
1998-05-20
Federal Railroad Administration (FRA) enforces federal railroad safety statutes under a delegation of authority from the Secretary of Transportation. FRA's mission is to protect railroad employees and the public by ensuring the safe operation of frei...
Preliminary Description of Stresses in Railroad Rail
DOT National Transportation Integrated Search
1976-11-01
One portion of the Federal Railroad Administration's (FRA) Track Performance Improvement Program is the development of engineering and analytic techniques required for the design and maintenance of railroad track of increased integrity and safety. Un...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-08
... family by converting two of its subsidiaries from corporations into limited liability companies: (1... Railroad Company, Patriot Rail, LLC, Patriot Rail Holdings LLC, and Patriot Rail Corp.--Corporate Family... Railroad Company (TSRR), Patriot Rail, LLC (PRL) and its subsidiaries, Patriot Rail Holdings LLC (PRH) and...
Fast rail corrugation detection based on texture filtering
NASA Astrophysics Data System (ADS)
Xiao, Jie; Lu, Kaixia
2018-02-01
The condition detection of rails in high-speed railway is one of the important means to ensure the safety of railway transportation. In order to replace the traditional manual inspection, save manpower and material resources, and improve the detection speed and accuracy, it is of great significance to develop a machine vision system for locating and identifying defects on rails automatically. Rail defects exhibit different properties and are divided into various categories related to the type and position of flaws on the rail. Several kinds of interrelated factors cause rail defects such as type of rail, construction conditions, and speed and/or frequency of trains using the rail. Rail corrugation is a particular kind of defects that produce an undulatory deformation on the rail heads. In high speed train, the corrugation induces harmful vibrations on wheels and its components and reduces the lifetime of rails. This type of defects should be detected to avoid rail fractures. In this paper, a novel method for fast rail corrugation detection based on texture filtering was proposed.
Securing America’s Passenger-Rail Systems
2007-01-01
around the world highlight the vulnerability of rail travel and the importance of rail security for these passengers. The use of passenger rail and...take to U.S. railways. Recent attacks on passenger-rail systems around the world highlight the vulnerability of rail travel and the importance of rail...rails (Boardman, 2005), making more than 3.5 billion trips (APTA, 2006).1 And these estimates do not count the passengers traveling on the National
Green's functions for analysis of dynamic response of wheel/rail to vertical excitation
NASA Astrophysics Data System (ADS)
Mazilu, Traian
2007-09-01
An analytical model to simulate wheel/rail interaction using the Green's functions method is proposed in this paper. The model consists of a moving wheel on a discretely supported rail. Particularly for this model of rail, the bending and the longitudinal displacement are coupled due to the rail pad and a complex model of the rail pad is adopted. An efficient method for solving a time-domain analysis for wheel/rail interaction is presented. The method is based on the properties of the rail's Green functions and starting to these functions, a track's Green matrix is assembled for the numerical simulations of wheel/rail response due to three kinds of vertical excitations: the steady-state interaction, the rail corrugation and the wheel flat. The study points to influence of the worn rail—rigid contact—on variation in the wheel/rail contact force. The concept of pinned-pinned inhibitive rail pad is also presented.
Code of Federal Regulations, 2010 CFR
2010-07-01
... applicable. (b) Quality assurance program. The importer must conduct a quality assurance program, as specified in this paragraph (b), for each truck or rail car loading terminal. (1) Quality assurance samples... an independent laboratory, and the terminal operator must not know in advance when samples are to be...
78 FR 33889 - Notice of Request for Revisions of an Information Collection
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-05
...) Background: 49 U.S.C. 5330 requires States to designate a State Safety Oversight (SSO) agency to oversee the... 5330, SSO agencies must develop program standards which meet FTA's minimum requirements. In the Program Standard, which must be approved by FTA, each SSO agency must require each rail transit agency in the State...
Space shuttle heat pipe thermal control systems
NASA Technical Reports Server (NTRS)
Alario, J.
1973-01-01
Heat pipe (HP) thermal control systems designed for possible space shuttle applications were built and tested under this program. They are: (1) a HP augmented cold rail, (2) a HP/phase change material (PCM) modular heat sink and (3) a HP radiating panel for compartment temperature control. The HP augmented cold rail is similar to a standard two-passage fluid cold rail except that it contains an integral, centrally located HP throughout its length. The central HP core helps to increase the local power density capability by spreading concentrated heat inputs over the entire rail. The HP/PCM modular heat sink system consists of a diode HP connected in series to a standard HP that has a PCM canister attached to its mid-section. It is designed to connect a heat source to a structural heat sink during normal operation, and to automatically decouple from it and sink to the PCM whenever structural temperatures are too high. The HP radiating panel is designed to conductively couple the panel feeder HPs directly to a fluid line that serves as a source of waste heat. It is a simple strap-on type of system that requires no internal or external line modifications to distribute the heat to a large radiating area.
Safety performance evaluation of the steel-backed log rail
DOT National Transportation Integrated Search
1992-12-01
The Coordinated Federal Lands Highways Technology Improvement Program (CTIP) was developed with the purpose of serving the immediate needs of those who design and construct Federal Lands Highways, including Indian Reservation roads, National Park roa...
Efficient access pricing for rail bottlenecks
DOT National Transportation Integrated Search
2000-06-01
This study, which is posted online, was undertaken at the request of the Federal Railroad Administration (FRA), specifically the Office of the Associate Administrator for Policy and Program Development. The FRA Policy Office asked for a review of som...
Inductive Interference in Rapid Transit Signaling Systems. Volume 3. Data and Test Results.
DOT National Transportation Integrated Search
1986-11-01
This report presents comparative inductive interference data obtained from four U.S. rapid transit systems employing chopper propulsion control, as part of the Rail Transit Electromagnetic Interference/Electromagnetic Compatibility program conducted ...
Track buckling prevention : theory, safety concepts, and applications
DOT National Transportation Integrated Search
2013-03-31
This report is a part of the John A. Volpe National Transportation Systems Centers Track Stability Research Program for the Federal Railroad Administration on thermal buckling of continuous welded rail (CWR) track and its prevention. Presented in ...
Passenger rail equipment research in the U.S.
DOT National Transportation Integrated Search
2002-03-22
In 1989 the Federal Railroad Administration (FRA) initiated a program of research into the safety aspects of high-speed passenger train systems. Collision safety the balancing of collision avoidance measures of the system with the crashworthiness...
Pulse Power Applications of Flux Compression Generators
1981-06-01
Characteristics are presented for two different types of explosive driven flux compression generators and a megavolt pulse transformer. Status reports are given for rail gun and plasma focus programs for which the generators serve as power sources.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-16
... Testing 11. Buy America 12. Corridor Preservation 13. Rail Car Procurements 14. Veterans Preference... transit assistance; to conduct State Safety Oversight, drug and alcohol, civil rights, procurement systems...
State Safety Oversight Program : annual report for 2003
DOT National Transportation Integrated Search
2004-10-01
The Federal Transit Administration (FTA) State Safety Oversight Rule (49 CFR Part 659) requires oversight of all rail transit agencies in revenue operation after January 1, 1997. This report summarizes activities performed to implement the State Safe...
State safety oversight program : annual report for 1999
DOT National Transportation Integrated Search
2000-09-01
The Federal Transit Administration (FTA) State Safety Oversight Rule (49 CFR Part 659) requires oversight for all rail transit agencies in revenue operation after January 1, 1997. This report summarizes activities performed to implement the State Saf...
Crippling test of a Budd Pioneer passenger car
DOT National Transportation Integrated Search
2012-04-16
This research program was sponsored by the Federal Railroad Administration (FRA) Office of Research and Development in support of the advancement of improved safety standards for passenger rail vehicles. FRA and the Volpe National Transportation Syst...
Independent Evaluators of Federal Programs: Approaches, Devices, and Examples
2010-08-16
rehabilitation of the disorder; the status of studies and clinical trials involving innovative treatments; a description of each treatment program and a...Transit Administration ( FTA ), a part of the Department of Transportation (DOT), oversees the safety and security of rail transit agencies which...an oversight body for each jurisdiction. The program is designed, according to a GAO summary, “as one in which FTA , other federal agencies, states
DOT National Transportation Integrated Search
1997-08-01
This report presents the results of investigations on the rail anchor/fastener effects on rail movement and the resulting rail force distribution in continuous welded rail (CWR) track during rail breaks and destressing operations. Two types of tests ...
78 FR 65244 - Rail Vehicles Access Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-31
...-0001] RIN 3014-AA42 Rail Vehicles Access Advisory Committee AGENCY: Architectural and Transportation Barriers Compliance Board. ACTION: Notice of advisory committee meeting. SUMMARY: The Rail Vehicles Access... vehicles that operate on fixed guideway systems (e.g., rapid rail, light rail, commuter rail, intercity...
Experimental and Computational Sonic Boom Assessment of Boeing N+2 Low Boom Models
NASA Technical Reports Server (NTRS)
Durston, Donald A.; Elmiligui, Alaa; Cliff, Susan E.; Winski, Courtney S.; Carter, Melissa B.; Walker, Eric L.
2015-01-01
Near-field pressure signatures were measured and computational predictions made for several sonic boom models representing Boeing's Quiet Experimental Validation Concept (QEVC) supersonic transport, as well as three axisymmetric calibration models. Boeing developed the QEVC under a NASA Research Announcement (NRA) contract for Experimental Systems Validations for N+2 Supersonic Commercial Transport Aircraft, which was led by the NASA High Speed Project under the Fundamental Aeronautics Program. The concept was designed to address environmental and performance goals given in the NRA, specifically for low sonic boom loudness levels and high cruise efficiency, for an aircraft anticipated to enter service in the 2020 timeframe. Wind tunnel tests were conducted on the aircraft and calibration models during Phases I and II of the NRA contract from 2011 to 2013 in the NASA Ames 9- by 7-Foot and NASA Glenn 8- by 6-Foot Supersonic Wind Tunnels. Sonic boom pressure signatures were acquired primarily at Mach 1.6 and 1.8, and force and moment data were acquired from Mach 0.8 to 1.8. The sonic boom test data were obtained using a 2-in. flat-top pressure rail and a 14-in. round-top tapered "reflection factor 1" (RF1) pressure rail. Both rails capture an entire pressure signature in one data point, and successive signatures at varying positions along or above the rail were used to improve data quality through spatial averaging. The sonic boom data obtained by the rails were validated with high-fidelity numerical simulations of off-body pressures using the CFD codes USM3D, Cart3D, and OVERFLOW. The test results from the RF1 rail showed good agreement between the computational and experimental data when a variety of testing techniques including spatial averaging of a series of pressure signatures were employed, however, reflections off the 2-in. flat-top rail caused distortions in the signatures that did not agree with the CFD predictions. The 9 x 7 and 8 x 6 wind tunnels generally produced comparable data.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Movement of a noise defective locomotive, rail car, or consist of a locomotive and rail cars. 210.9 Section 210.9 Transportation Other Regulations... locomotive, rail car, or consist of a locomotive and rail cars. A locomotive, rail car, or consist of a...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Movement of a noise defective locomotive, rail car, or consist of a locomotive and rail cars. 210.9 Section 210.9 Transportation Other Regulations... locomotive, rail car, or consist of a locomotive and rail cars. A locomotive, rail car, or consist of a...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Movement of a noise defective locomotive, rail car, or consist of a locomotive and rail cars. 210.9 Section 210.9 Transportation Other Regulations... locomotive, rail car, or consist of a locomotive and rail cars. A locomotive, rail car, or consist of a...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Movement of a noise defective locomotive, rail car, or consist of a locomotive and rail cars. 210.9 Section 210.9 Transportation Other Regulations... locomotive, rail car, or consist of a locomotive and rail cars. A locomotive, rail car, or consist of a...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Movement of a noise defective locomotive, rail car, or consist of a locomotive and rail cars. 210.9 Section 210.9 Transportation Other Regulations... locomotive, rail car, or consist of a locomotive and rail cars. A locomotive, rail car, or consist of a...
Real-time and accurate rail wear measurement method and experimental analysis.
Liu, Zhen; Li, Fengjiao; Huang, Bangkui; Zhang, Guangjun
2014-08-01
When a train is running on uneven or curved rails, it generates violent vibrations on the rails. As a result, the light plane of the single-line structured light vision sensor is not vertical, causing errors in rail wear measurements (referred to as vibration errors in this paper). To avoid vibration errors, a novel rail wear measurement method is introduced in this paper, which involves three main steps. First, a multi-line structured light vision sensor (which has at least two linear laser projectors) projects a stripe-shaped light onto the inside of the rail. Second, the central points of the light stripes in the image are extracted quickly, and the three-dimensional profile of the rail is obtained based on the mathematical model of the structured light vision sensor. Then, the obtained rail profile is transformed from the measurement coordinate frame (MCF) to the standard rail coordinate frame (RCF) by taking the three-dimensional profile of the measured rail waist as the datum. Finally, rail wear constraint points are adopted to simplify the location of the rail wear points, and the profile composed of the rail wear points are compared with the standard rail profile in RCF to determine the rail wear. Both real data experiments and simulation experiments show that the vibration errors can be eliminated when the proposed method is used.
78 FR 78275 - Alcohol and Drug Testing: Determination of Minimum Random Testing Rates for 2014
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-26
... to data from FRA's Management Information System, the rail industry's random drug testing positive... December 26, 2013. FOR FURTHER INFORMATION CONTACT: Jerry Powers, FRA Drug and Alcohol Program Manager, W38...
The Chicago-Iowa City passenger rail program : fact sheet.
DOT National Transportation Integrated Search
2011-02-23
Project costs : Overall cost: $310 million : Costs allocated between Iowa and Illinois : Iowa and Illinois submitted a joint application for $248 : million (up to 80 percent of the project cost) from the : High-Speed Intercity Passenger R...
The development of a rail passenger coach car crush zone
DOT National Transportation Integrated Search
2002-03-21
There is currently an active program within the United States to improve the passive safety of train systems. In particular, the Volpe Center is supporting the Federal Railroad Administrations research that includes numerous analytical studies and...
Prototype design of an engineer collision protection system
DOT National Transportation Integrated Search
2012-04-17
This research program was sponsored by the Federal Railroad Administration (FRA) Office of Research and Development in support of the advancement of improved safety standards for passenger rail vehicles. In a train collision, the cab or locomotive en...
40 CFR 201.13 - Standard for rail car operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Standard for rail car operations. 201... Interstate Rail Carrier Operations Standards § 201.13 Standard for rail car operations. Effective December 31, 1976, no carrier subject to this regulation shall operate any rail car or combination of rail cars...
40 CFR 201.13 - Standard for rail car operations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Standard for rail car operations. 201... Interstate Rail Carrier Operations Standards § 201.13 Standard for rail car operations. Effective December 31, 1976, no carrier subject to this regulation shall operate any rail car or combination of rail cars...
40 CFR 201.13 - Standard for rail car operations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Standard for rail car operations. 201... Interstate Rail Carrier Operations Standards § 201.13 Standard for rail car operations. Effective December 31, 1976, no carrier subject to this regulation shall operate any rail car or combination of rail cars...
40 CFR 201.13 - Standard for rail car operations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Standard for rail car operations. 201... Interstate Rail Carrier Operations Standards § 201.13 Standard for rail car operations. Effective December 31, 1976, no carrier subject to this regulation shall operate any rail car or combination of rail cars...
40 CFR 201.13 - Standard for rail car operations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Standard for rail car operations. 201... Interstate Rail Carrier Operations Standards § 201.13 Standard for rail car operations. Effective December 31, 1976, no carrier subject to this regulation shall operate any rail car or combination of rail cars...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-28
... Environmental Policy Act of 1969 (NEPA) for the State of Oklahoma High-Speed Rail Initiative: Tulsa--Oklahoma... South Central High Speed Rail Corridor and is a federally-designated high-speed rail (HSR) corridor...-Speed Rail Initiative: Tulsa--Oklahoma City Passenger Rail Corridor Investment Plan. The proposed route...
Kennedy, J L; Marston, T M; Lee, K; Lopes, J L; Lim, R
2014-01-01
A 22 m diameter circular rail, outfitted with a mobile sonar tower trolley, was designed, fabricated, instrumented with underwater acoustic transducers, and assembled on a 1.5 m thick sand layer at the bottom of a large freshwater pool to carry out sonar design and target scattering response studies. The mobile sonar tower translates along the rail via a drive motor controlled by customized LabVIEW software. The rail system is modular and assembly consists of separately deploying eight circular arc sections, measuring a nominal center radius of 11 m and 8.64 m arc length each, and having divers connect them together in the underwater environment. The system enables full scale measurements on targets of interest with 0.1° angular resolution over a complete 360° aperture, without disrupting target setup, and affording a level of control over target environment conditions and noise sources unachievable in standard field measurements. In recent use, the mobile cart carrying an instrumented sonar tower was translated along the rail in 720 equal position increments and acoustic backscatter data were acquired at each position. In addition, this system can accommodate both broadband monostatic and bistatic scattering measurements on targets of interest, allowing capture of target signature phenomena under diverse configurations to address current scientific and technical issues encountered in mine countermeasure and unexploded ordnance applications. In the work discussed here, the circular rail apparatus is used for acoustic backscatter testing, but this system also has the capacity to facilitate the acquisition of magnetic and optical sensor data from targets of interest. A brief description of the system design and operation will be presented along with preliminary processed results for data acquired from acoustic measurements conducted at the Naval Surface Warfare Center, Panama City Division Test Pond Facility. [Work Supported by the U.S. Office of Naval Research and The Strategic Environmental Research and Development Program.].
PLUTONIUM/HIGH-LEVEL VITRIFIED WASTE BDBE DOSE CALCULATION
DOE Office of Scientific and Technical Information (OSTI.GOV)
D.C. Richardson
2003-03-19
In accordance with the Nuclear Waste Policy Amendments Act of 1987, Yucca Mountain was designated as the site to be investigated as a potential repository for the disposal of high-level radioactive waste. The Yucca Mountain site is an undeveloped area located on the southwestern edge of the Nevada Test Site (NTS), about 100 miles northwest of Las Vegas. The site currently lacks rail service or an existing right-of-way. If the Yucca Mountain site is found suitable for the repository, rail service is desirable to the Office of Civilian Waste Management (OCRWM) Program because of the potential of rail transportation tomore » reduce costs and to reduce the number of shipments relative to highway transportation. A Preliminary Rail Access Study evaluated 13 potential rail spur options. Alternative routes within the major options were also developed. Each of these options was then evaluated for potential land use conflicts and access to regional rail carriers. Three potential routes having few land use conflicts and having access to regional carriers were recommended for further investigation. Figure 1-1 shows these three routes. The Jean route is estimated to be about 120 miles long, the Carlin route to be about 365 miles long, and Caliente route to be about 365 miles long. The remaining ten routes continue to be monitored and should any of the present conflicts change, a re-evaluation of that route will be made. Complete details of the evaluation of the 13 routes can be found in the previous study. The DOE has not identified any preferred route and recognizes that the transportation issues need a full and open treatment under the National Environmental Policy Act. The issue of transportation will be included in public hearings to support development of the Environmental Impact Statement (EIS) proceedings for either the Monitored Retrievable Storage Facility or the Yucca Mountain Project or both.« less
NASA Astrophysics Data System (ADS)
Kennedy, J. L.; Marston, T. M.; Lee, K.; Lopes, J. L.; Lim, R.
2014-01-01
A 22 m diameter circular rail, outfitted with a mobile sonar tower trolley, was designed, fabricated, instrumented with underwater acoustic transducers, and assembled on a 1.5 m thick sand layer at the bottom of a large freshwater pool to carry out sonar design and target scattering response studies. The mobile sonar tower translates along the rail via a drive motor controlled by customized LabVIEW software. The rail system is modular and assembly consists of separately deploying eight circular arc sections, measuring a nominal center radius of 11 m and 8.64 m arc length each, and having divers connect them together in the underwater environment. The system enables full scale measurements on targets of interest with 0.1° angular resolution over a complete 360° aperture, without disrupting target setup, and affording a level of control over target environment conditions and noise sources unachievable in standard field measurements. In recent use, the mobile cart carrying an instrumented sonar tower was translated along the rail in 720 equal position increments and acoustic backscatter data were acquired at each position. In addition, this system can accommodate both broadband monostatic and bistatic scattering measurements on targets of interest, allowing capture of target signature phenomena under diverse configurations to address current scientific and technical issues encountered in mine countermeasure and unexploded ordnance applications. In the work discussed here, the circular rail apparatus is used for acoustic backscatter testing, but this system also has the capacity to facilitate the acquisition of magnetic and optical sensor data from targets of interest. A brief description of the system design and operation will be presented along with preliminary processed results for data acquired from acoustic measurements conducted at the Naval Surface Warfare Center, Panama City Division Test Pond Facility. [Work Supported by the U.S. Office of Naval Research and The Strategic Environmental Research and Development Program.
Solar panel truss mounting systems and methods
Al-Haddad, Tristan Farris; Cavieres, Andres; Gentry, Russell; Goodman, Joseph; Nolan, Wade; Pitelka, Taylor; Rahimzadeh, Keyan; Brooks, Bradley; Lohr, Joshua; Crooks, Ryan; Porges, Jamie; Rubin, Daniel
2015-10-20
An exemplary embodiment of the present invention provides a solar panel truss mounting system comprising a base and a truss assembly coupled to the base. The truss assembly comprises a first panel rail mount, second panel rail mount parallel to the first panel rail mount, base rail mount parallel to the first and second panel rail mounts, and a plurality of support members. A first portion of the plurality of support members extends between the first and second panel rail mounts. A second portion of the plurality of support members extends between the first panel rail mount and the base rail mount. A third portion of the plurality of support members extends between the second panel rail mount and the base rail mount. The system can further comprise a plurality of connectors for coupling a plurality of photovoltaic solar panels to the truss assembly.
Solar panel truss mounting systems and methods
Al-Haddad, Tristan Farris; Cavieres, Andres; Gentry, Russell; Goodman, Joseph; Nolan, Wade; Pitelka, Taylor; Rahimzadeh, Keyan; Brooks, Bradley; Lohr, Joshua; Crooks, Ryan; Porges, Jamie; Rubin, Daniel
2016-06-28
An exemplary embodiment of the present invention provides a solar panel truss mounting system comprising a base and a truss assembly coupled to the base. The truss assembly comprises a first panel rail mount, second panel rail mount parallel to the first panel rail mount, base rail mount parallel to the first and second panel rail mounts, and a plurality of support members. A first portion of the plurality of support members extends between the first and second panel rail mounts. A second portion of the plurality of support members extends between the first panel rail mount and the base rail mount. A third portion of the plurality of support members extends between the second panel rail mount and the base rail mount. The system can further comprise a plurality of connectors for coupling a plurality of photovoltaic solar panels to the truss assembly.
Train repathing in emergencies based on fuzzy linear programming.
Meng, Xuelei; Cui, Bingmou
2014-01-01
Train pathing is a typical problem which is to assign the train trips on the sets of rail segments, such as rail tracks and links. This paper focuses on the train pathing problem, determining the paths of the train trips in emergencies. We analyze the influencing factors of train pathing, such as transferring cost, running cost, and social adverse effect cost. With the overall consideration of the segment and station capability constraints, we build the fuzzy linear programming model to solve the train pathing problem. We design the fuzzy membership function to describe the fuzzy coefficients. Furthermore, the contraction-expansion factors are introduced to contract or expand the value ranges of the fuzzy coefficients, coping with the uncertainty of the value range of the fuzzy coefficients. We propose a method based on triangular fuzzy coefficient and transfer the train pathing (fuzzy linear programming model) to a determinate linear model to solve the fuzzy linear programming problem. An emergency is supposed based on the real data of the Beijing-Shanghai Railway. The model in this paper was solved and the computation results prove the availability of the model and efficiency of the algorithm.
Review on Selection and Suitability of Rail Transit Station Design Pertaining to Public Safety
NASA Astrophysics Data System (ADS)
Akabal, Farah Mohd; Masirin, Mohd Idrus Haji Mohd; Abidin Akasah, Zainal; Rohani, Munzilah Md
2017-08-01
Railway has emerged as a fast, convenient, safe, clean, and low-cost alternative to air and road transportation. Many countries have invested in rail transportation. In America, Europe and Asia, large investments are planned for rail transportation. This is because congestion problems can be reduced with the introduction of rail transportation. Rail transportation involves several components which are important to ensure the smooth and safe delivery of services such as locomotives, rail stations and railway tracks. Rail transit stations are places where trains stop to pick-up and drop-off passengers. Stations are vital for many to enable them to engage in work and social commitments. This paper focuses only on the rail transit station as it is one of the important components in rail transportation. It is also considered as a key public meeting place and space for interactions in a community. The role of rail transit station and the requirements of a good rail transit station are also described in this paper. Steps in selecting the location of rail transit station include the function and facilities in rail transit station are discussed with reference to best practices and handbooks. Selection of the appropriate rail transit station locations may help users indirectly. In addition, this paper will also elucidate on the design considerations for an efficient and effective rail transit station. Design selections for the rail transit station must be balanced between aesthetic value and functional efficiency. The right design selection may help conserve energy, assure and facilitate consumers even thought a rail transit station plays a smaller role in attracting consumers compared to a shopping complex or a residential building. This will contribute towards better and greener building for a green transportation facility. Thus, with this paper it is expected to assist the relevant authority to identify important elements in the selection and determination of suitable rail transit station design for the future. It is also important to ensure the design is appropriate from the selection and suitability perspective as design and operation will assist to facilitate the success of the national rail network and encourage the public to use rail transit system. A conducive and neatly design railway station will not only add to the passenger experience but also, as a supporting facility to the economic, social and environmental benefits of the rail industry.
Modern Methods of Rail Welding
NASA Astrophysics Data System (ADS)
Kozyrev, Nikolay A.; Kozyreva, Olga A.; Usoltsev, Aleksander A.; Kryukov, Roman E.; Shevchenko, Roman A.
2017-10-01
Existing methods of rail welding, which are enable to get continuous welded rail track, are observed in this article. Analysis of existing welding methods allows considering an issue of continuous rail track in detail. Metallurgical and welding technologies of rail welding and also process technologies reducing aftereffects of temperature exposure are important factors determining the quality and reliability of the continuous rail track. Analysis of the existing methods of rail welding enable to find the research line for solving this problem.
46 CFR 28.410 - Deck rails, lifelines, storm rails, and hand grabs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Deck rails, lifelines, storm rails, and hand grabs. 28..., lifelines, storm rails, and hand grabs. (a) Except as otherwise provided in paragraph (d) of this section... with a bulwark, chain link fencing, wire mesh, or an equivalent. (f) A suitable storm rail or hand grab...
46 CFR 28.410 - Deck rails, lifelines, storm rails, and hand grabs.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Deck rails, lifelines, storm rails, and hand grabs. 28..., lifelines, storm rails, and hand grabs. (a) Except as otherwise provided in paragraph (d) of this section... with a bulwark, chain link fencing, wire mesh, or an equivalent. (f) A suitable storm rail or hand grab...
46 CFR 28.810 - Deck rails, lifelines, storm rails and hand grabs.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Deck rails, lifelines, storm rails and hand grabs. 28..., storm rails and hand grabs. (a) Except as otherwise provided in paragraph (d) of this section, deck... bulwark, chain link fencing, wire mesh, or an equivalent. (f) A suitable storm rail or hand grab must be...
46 CFR 28.810 - Deck rails, lifelines, storm rails and hand grabs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Deck rails, lifelines, storm rails and hand grabs. 28..., storm rails and hand grabs. (a) Except as otherwise provided in paragraph (d) of this section, deck... bulwark, chain link fencing, wire mesh, or an equivalent. (f) A suitable storm rail or hand grab must be...
46 CFR 28.810 - Deck rails, lifelines, storm rails and hand grabs.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Deck rails, lifelines, storm rails and hand grabs. 28..., storm rails and hand grabs. (a) Except as otherwise provided in paragraph (d) of this section, deck... bulwark, chain link fencing, wire mesh, or an equivalent. (f) A suitable storm rail or hand grab must be...
46 CFR 28.410 - Deck rails, lifelines, storm rails, and hand grabs.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Deck rails, lifelines, storm rails, and hand grabs. 28..., lifelines, storm rails, and hand grabs. (a) Except as otherwise provided in paragraph (d) of this section... with a bulwark, chain link fencing, wire mesh, or an equivalent. (f) A suitable storm rail or hand grab...
46 CFR 28.410 - Deck rails, lifelines, storm rails, and hand grabs.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Deck rails, lifelines, storm rails, and hand grabs. 28..., lifelines, storm rails, and hand grabs. (a) Except as otherwise provided in paragraph (d) of this section... with a bulwark, chain link fencing, wire mesh, or an equivalent. (f) A suitable storm rail or hand grab...
46 CFR 28.410 - Deck rails, lifelines, storm rails, and hand grabs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Deck rails, lifelines, storm rails, and hand grabs. 28..., lifelines, storm rails, and hand grabs. (a) Except as otherwise provided in paragraph (d) of this section... with a bulwark, chain link fencing, wire mesh, or an equivalent. (f) A suitable storm rail or hand grab...
46 CFR 28.810 - Deck rails, lifelines, storm rails and hand grabs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Deck rails, lifelines, storm rails and hand grabs. 28..., storm rails and hand grabs. (a) Except as otherwise provided in paragraph (d) of this section, deck... bulwark, chain link fencing, wire mesh, or an equivalent. (f) A suitable storm rail or hand grab must be...
46 CFR 28.810 - Deck rails, lifelines, storm rails and hand grabs.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Deck rails, lifelines, storm rails and hand grabs. 28..., storm rails and hand grabs. (a) Except as otherwise provided in paragraph (d) of this section, deck... bulwark, chain link fencing, wire mesh, or an equivalent. (f) A suitable storm rail or hand grab must be...
Chang, Seky; Pyun, Young-Sik; Amanov, Auezhan
2017-02-16
In this study, an ultrasonic nanocrystalline surface modification (UNSM) technique was applied to normal and heat-treated rails made of 60 kgK steel to enhance the wear resistance of the wheel-rail interaction. The hardness and compressive residual stress values of the untreated and UNSM-treated rails were measured by the Brinell hardness tester and X-ray diffraction technique, respectively. It was found, according to the measurement results, that the hardness was increased by about 20% and 8%, whereas the compressive residual stress was induced by about 52% and 62% for the UNSM-treated normal and heat-treated rails, respectively. The UNSM-treated normal rail showed a slightly higher hardness than the heat-treated rail. The wear resistance of rails with respect to rotating speed and rolling time was assessed using a rolling contact wear (RCW) tester under dry conditions. The RCW test results revealed that the wear of the UNSM-treated rails was enhanced in comparison with those of the untreated rails. Also, the wear amount of the rails was increased with increasing the rotation speed. The UNSM-treated normal rail exhibited the highest wear resistance with respect to the rotation speed. The wear mechanisms of the rails are also discussed based on microscopic images of the worn out surfaces.
Chang, Seky; Pyun, Young-Sik; Amanov, Auezhan
2017-01-01
In this study, an ultrasonic nanocrystalline surface modification (UNSM) technique was applied to normal and heat-treated rails made of 60 kgK steel to enhance the wear resistance of the wheel-rail interaction. The hardness and compressive residual stress values of the untreated and UNSM-treated rails were measured by the Brinell hardness tester and X-ray diffraction technique, respectively. It was found, according to the measurement results, that the hardness was increased by about 20% and 8%, whereas the compressive residual stress was induced by about 52% and 62% for the UNSM-treated normal and heat-treated rails, respectively. The UNSM-treated normal rail showed a slightly higher hardness than the heat-treated rail. The wear resistance of rails with respect to rotating speed and rolling time was assessed using a rolling contact wear (RCW) tester under dry conditions. The RCW test results revealed that the wear of the UNSM-treated rails was enhanced in comparison with those of the untreated rails. Also, the wear amount of the rails was increased with increasing the rotation speed. The UNSM-treated normal rail exhibited the highest wear resistance with respect to the rotation speed. The wear mechanisms of the rails are also discussed based on microscopic images of the worn out surfaces. PMID:28772549
Crashworthiness evaluation of light rail vehicle interiors.
DOT National Transportation Integrated Search
2011-12-01
Statistically, light rail transit (LRT) systems have higher injury rates on a perpassengermile basis than heavy rail and commuter rail systems, because in most cities, light rail vehicles (LRVs) operate on city streets. Passenger safety is depe...
Solar panel truss mounting systems and methods
DOE Office of Scientific and Technical Information (OSTI.GOV)
Al-Haddad, Tristan Farris; Cavieres, Andres; Gentry, Russell
An exemplary embodiment of the present invention provides a solar panel truss mounting system comprising a base and a truss assembly coupled to the base. The truss assembly comprises a first panel rail mount, second panel rail mount parallel to the first panel rail mount, base rail mount parallel to the first and second panel rail mounts, and a plurality of support members. A first portion of the plurality of support members extends between the first and second panel rail mounts. A second portion of the plurality of support members extends between the first panel rail mount and the basemore » rail mount. A third portion of the plurality of support members extends between the second panel rail mount and the base rail mount. The system can further comprise a plurality of connectors for coupling a plurality of photovoltaic solar panels to the truss assembly.« less
An overview of passenger equipment full-scale impact tests
DOT National Transportation Integrated Search
2003-10-07
As part of the Federal Railroad Administrations Equipment Safety Research Program, a series of full-scale impact tests are being conducted on rail passenger vehicles. Four types of tests are intended to define the performance of current-design equ...
ITS National Intelligent Transportation Systems Program Plan: Five Year Horizon Plan
DOT National Transportation Integrated Search
2000-08-01
Transportation is vital to the social and economic health of the nation. Surface transportation systems - the net-works of highways, local streets, bus routes, and rail lines - are the ties that bind communities and facilitate commerce, connecting re...
DOT's budget : management and performance issues facing the department in fiscal year 1999
DOT National Transportation Integrated Search
1998-02-12
This testimony discusses key resource management issues and performance challenges facing the Department of Transportation in 1999 and beyond. 1. There is a need for increased management attention to highway, transit, and rail programs - which accoun...
An overview of passenger equipment fullscale impact tests : results to date
DOT National Transportation Integrated Search
2001-11-25
As part of the Federal Railroad Administrations Equipment Safety Research Program, a series of full-scale impact tests are being conducted on rail passenger vehicles. Three tests are intended to define the performance of current-design equipment i...
76 FR 70345 - Drawbridge Operation Regulations; Elizabeth River, Eastern Branch, Norfolk, VA
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-14
... 33 CFR 117.1007(a) to facilitate laying new rail. Under the current operation schedule, the draw...., Bridge Program Manager, Fifth Coast Guard District. [FR Doc. 2011-29236 Filed 11-10-11; 8:45 am] BILLING...
Radiated Interference in Rapid Transit Systems. Volume 1. Theory and Data.
DOT National Transportation Integrated Search
1988-04-01
For the past eight years, the UMTA Office of Systems Engineering, U.S. Department of Transportation, has sponsored a program to delineate and mitigate the effects of electromagnetic interference (EMI) in rail transit operations. Work has proceeded un...
ICAO Assistance to Civil Aviation in the Developing World.
ERIC Educational Resources Information Center
Vivian, Jack
1981-01-01
Describes the cost advantages of air transportation over road, rail, and river transportation in many circumstances which prevail today in developing countries. Presents accounts of International Civil Aviation Organization's (ICAO's) efforts supporting civil aviation programs in these countries. (DS)
Estimation of rail wear limits based on rail strength investigations
DOT National Transportation Integrated Search
1998-12-01
This report describes analyses performed to estimate limits on rail wear based on strength investigations. Two different failure modes are considered in this report: (1) permanent plastic bending, and (2) rail fracture. Rail bending stresses are calc...
2000 Montana state rail plan update
DOT National Transportation Integrated Search
2000-01-01
This 2000 Montana Rail Plan Update is a comprehensive update of the State Rail Plan. The purpose of this update is to review the State's role in rail planning, retain eligibility for Local Rail Freight Assistance (LRFA) funding, update the descriptio...
Code of Federal Regulations, 2010 CFR
2010-10-01
... lease of remanufactured rail vehicles by public entities operating rapid or light rail systems. 37.83... operating rapid or light rail systems. (a) This section applies to any public entity operating a rapid or... operates a rapid or light rail system any segment of which is included on the National Register of Historic...
Code of Federal Regulations, 2014 CFR
2014-10-01
... lease of remanufactured rail vehicles by public entities operating rapid or light rail systems. 37.83... operating rapid or light rail systems. (a) This section applies to any public entity operating a rapid or... operates a rapid or light rail system any segment of which is included on the National Register of Historic...
Code of Federal Regulations, 2011 CFR
2011-10-01
... lease of remanufactured rail vehicles by public entities operating rapid or light rail systems. 37.83... operating rapid or light rail systems. (a) This section applies to any public entity operating a rapid or... operates a rapid or light rail system any segment of which is included on the National Register of Historic...
Code of Federal Regulations, 2013 CFR
2013-10-01
... lease of remanufactured rail vehicles by public entities operating rapid or light rail systems. 37.83... operating rapid or light rail systems. (a) This section applies to any public entity operating a rapid or... operates a rapid or light rail system any segment of which is included on the National Register of Historic...
Code of Federal Regulations, 2012 CFR
2012-10-01
... lease of remanufactured rail vehicles by public entities operating rapid or light rail systems. 37.83... operating rapid or light rail systems. (a) This section applies to any public entity operating a rapid or... operates a rapid or light rail system any segment of which is included on the National Register of Historic...
Multi-point contact of the high-speed vehicle-turnout system dynamics
NASA Astrophysics Data System (ADS)
Ren, Zunsong
2013-05-01
The wheel-rail contact problems, such as the number, location and the track of contact patches, are very important for optimizing the spatial structure of the rails and lowering the vehicle-turnout system dynamics. However, the above problems are not well solved currently because of having the difficulties in how to determine the multi-contact, to preciously present the changeable profiles of the rails and to establish an accurate spatial turnout system dynamics model. Based on a high-speed vehicle-turnout coupled model in which the track is modeled as flexible with rails and sleepers represented by beams, the line tracing extreme point method is introduced to investigate the wheel-rail multiple contact conditions and the key sections of the blade rail, longer nose rail, shorter rail in the switch and nose rail area are discretized to represent the varying profiles of rails in the turnout. The dynamic interaction between the vehicle and turnout is simulated for cases of the vehicle divergently passing the turnout and the multi-point contact is obtained. The tracks of the contact patches on the top of the rails are presented and the wheel-rail impact forces are offered in comparison with the contact patches transference on the rails. The numerical simulation results indicate that the length of two-point contact occurrence of a worn wheel profile and rails is longer than that of the new wheel profile and rails; The two-point contact definitely occurs in the switch and crossing area. Generally, three-point contact doesn't occur for the new rail profile, which is testified by the wheel-rails interpolation distance and the first order derivative function of the tracing line extreme points. The presented research is not only helpful to optimize the structure of the turnout, but also useful to lower the dynamics of the high speed vehicle-turnout system.
Bui, Thuy-Vy D.; Takekawa, John Y.; Overton, Cory T.; Schultz, Emily R.; Hull, Joshua M.; Casazza, Michael L.
2015-01-01
The California Ridgway's rail Rallus obsoletus obsoletus (hereafter California rail) is a secretive marsh bird endemic to tidal marshes in the San Francisco Bay (hereafter bay) of California. The California rail has undergone significant range contraction and population declines due to a variety of factors, including predation and the degradation and loss of habitat. Call-count surveys, which include call playbacks, based on the standardized North American marsh bird monitoring protocol have been conducted throughout the bay since 2005 to monitor population size and distribution of the California rail. However, call-count surveys are difficult to evaluate for efficacy or accuracy. To measure the accuracy of call-count surveys and investigate whether radio-marked California rails moved in response to call-count surveys, we compared locations of radio-marked California rails collected at frequent intervals (15 min) to California rail detections recorded during call-count surveys conducted over the same time periods. Overall, 60% of radio-marked California rails within 200 m of observers were not detected during call-count surveys. Movements of radio-marked California rails showed no directional bias (P = 0.92) irrespective of whether or not playbacks of five marsh bird species (including the California rail) were broadcast from listening stations. Our findings suggest that playbacks of rail vocalizations do not consistently influence California rail movements during surveys. However, call-count surveys may underestimate California rail presence; therefore, caution should be used when relating raw numbers of call-count detections to population abundance.
Rail-to-rail differential input amplification stage with main and surrogate differential pairs
Britton, Jr., Charles Lanier; Smith, Stephen Fulton
2007-03-06
An operational amplifier input stage provides a symmetrical rail-to-rail input common-mode voltage without turning off either pair of complementary differential input transistors. Secondary, or surrogate, transistor pairs assume the function of the complementary differential transistors. The circuit also maintains essentially constant transconductance, constant slew rate, and constant signal-path supply current as it provides rail-to-rail operation.
Analysis of minimum rail size in heavy axle load environment
DOT National Transportation Integrated Search
2013-04-15
The effects of increasing axle loads on rail integrity are examined in this paper. In the present context, rail integrity refers to the prevention and control of rail failures. Rail failures usually occur because cracks or defects develop and grow fr...
Developing course lecture notes on high-speed rail.
DOT National Transportation Integrated Search
2017-07-15
1. Introduction a. World-wide Development of High-Speed Rail (Japan, Europe, China) b. High-speed Rail in the U.S. 2. High-Speed Rail Infrastructure a. Geometric Design of High Speed Rail i. Horizontal Curve ii. Vertical Curve iii. Grade and Turnout ...
Overton, Cory T.; Casazza, Michael L.; Takekawa, John Y.; Strong, Donald R.; Holyoak, Marcel
2014-01-01
Invasive species frequently degrade habitats, disturb ecosystem processes, and can increase the likelihood of extinction of imperiled populations. However, novel or enhanced functions provided by invading species may reduce the impact of processes that limit populations. It is important to recognize how invasive species benefit endangered species to determine overall effects on sensitive ecosystems. For example, since the 1990s, hybrid Spartina (Spartina foliosa × alterniflora) has expanded throughout South San Francisco Bay, USA, supplanting native vegetation and invading mudflats. The endangered California clapper rail (Rallus longirostris obsoletus) uses the tall, dense hybrid Spartina for cover and nesting, but the effects of hybrid Spartina on clapper rail survival was unknown. We estimated survival rates of 108 radio-marked California clapper rails in South San Francisco Bay from January 2007 to March 2010, a period of extensive hybrid Spartina eradication, with Kaplan–Meier product limit estimators. Clapper rail survival patterns were consistent with hybrid Spartina providing increased refuge cover from predators during tidal extremes which flood native vegetation, particularly during the winter when the vegetation senesces. Model averaged annual survival rates within hybrid Spartina dominated marshes before eradication (Ŝ = 0.466) were greater than the same marshes posttreatment (Ŝ = 0.275) and a marsh dominated by native vegetation (Ŝ = 0.272). However, models with and without marsh treatment as explanatory factor for survival rates had nearly equivalent support in the observed data, lending ambiguity as to whether hybrid Spartina facilitated greater survival rates than native marshland. Conservation actions to aid in recovery of this endangered species should recognize the importance of available of high tide refugia, particularly in light of invasive species eradication programs and projections of future sea-level rise.
Assessment of Rail Seat Abrasion Patterns and Environment
DOT National Transportation Integrated Search
2012-05-01
Rail seat abrasion (RSA) of concrete ties is manifested by the loss of material under the rail seat area and, in extreme cases, results in loss of rail clip holding power, reverse rail cant, and gauge widening. RSA was measured in several curves on t...
78 FR 59316 - Rail Vehicles Access Advisory Committee Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-26
...-0001] RIN 3014-AA42 Rail Vehicles Access Advisory Committee Meetings AGENCY: Architectural and... Vehicles Access Advisory Committee (Committee) will hold its first meeting. We, the Architectural and... transportation vehicles that operate on fixed guideway systems (e.g., rapid rail, light rail, commuter rail...
49 CFR 225.9 - Telephonic reports of certain accidents/incidents and other events.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of a passenger train; (iii) A fatality at a highway-rail grade crossing as a result of a train... Transportation Safety Board (49 CFR part 840) and the Research and Special Programs Administration of the U.S...
Crashworthiness Analysis of the UMTA State-of-the-Art Cars
DOT National Transportation Integrated Search
1975-10-01
An engineering assessment of the crashworthiness of the UMTA State-of-the-Art Car (SOAC) has been conducted as part of a program to provide safer transportation to urban rail vehicles. Crash dynamics and crashworthiness methodology based on post-yiel...
DOT National Transportation Integrated Search
2011-06-01
Cities across the United States are grappling with a looming transportation crisis as a : result of ever-increasing passenger and freight transport demands and overburdened : networks of aging infrastructure. All levels of government, but particularl...
78 FR 71708 - Notification of Application for Approval of a Railroad Safety Program Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-29
... by a letter dated October 15, 2013, the Long Island Rail Road petitioned the Federal Railroad... accepting comments on the RSPP revision. A copy of the petition, as well as any written communications... written [[Page 71709
40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the in situ combustion of coal are regulated by the Rail Road Commission of Texas under a separate UIC... program for Class I, III, IV, and V wells in the State of Texas, except for those wells on Indian lands... (SDWA). Notice of the original approval for Class I, III, IV, and V wells was published in the Federal...
40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.
Code of Federal Regulations, 2012 CFR
2012-07-01
... the in situ combustion of coal are regulated by the Rail Road Commission of Texas under a separate UIC... program for Class I, III, IV, and V wells in the State of Texas, except for those wells on Indian lands... (SDWA). Notice of the original approval for Class I, III, IV, and V wells was published in the Federal...
Field homogeneity improvement of maglev NdFeB magnetic rails from joints.
Li, Y J; Dai, Q; Deng, C Y; Sun, R X; Zheng, J; Chen, Z; Sun, Y; Wang, H; Yuan, Z D; Fang, C; Deng, Z G
2016-01-01
An ideal magnetic rail should provide a homogeneous magnetic field along the longitudinal direction to guarantee the reliable friction-free operation of high temperature superconducting (HTS) maglev vehicles. But in reality, magnetic field inhomogeneity may occur due to lots of reasons; the joint gap is the most direct one. Joint gaps inevitably exist between adjacent segments and influence the longitudinal magnetic field homogeneity above the rail since any magnetic rails are consisting of many permanent magnet segments. To improve the running performance of maglev systems, two new rail joints are proposed based on the normal rail joint, which are named as mitered rail joint and overlapped rail joint. It is found that the overlapped rail joint has a better effect to provide a competitive homogeneous magnetic field. And the further structure optimization has been done to ensure maglev vehicle operation as stable as possible when passing through those joint gaps. The results show that the overlapped rail joint with optimal parameters can significantly reduce the magnetic field inhomogeneity comparing with the other two rail joints. In addition, an appropriate gap was suggested when balancing the thermal expansion of magnets and homogenous magnetic field, which is considered valuable references for the future design of the magnetic rails.
DOT National Transportation Integrated Search
2001-03-21
The Rail Passenger Service Act of 1970 created Amtrak to provide intercity passenger rail service. Like other major national intercity passenger rail systems in the world, Amtrak has received substantial government support-nearly $24 billion for capi...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Storm rails. 169.329 Section 169.329 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Construction and Arrangement Rails and Guards § 169.329 Storm rails. Suitable storm rails or hand grabs must be...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Storm rails. 169.329 Section 169.329 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Construction and Arrangement Rails and Guards § 169.329 Storm rails. Suitable storm rails or hand grabs must be...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Storm rails. 169.329 Section 169.329 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Construction and Arrangement Rails and Guards § 169.329 Storm rails. Suitable storm rails or hand grabs must be...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Storm rails. 169.329 Section 169.329 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Construction and Arrangement Rails and Guards § 169.329 Storm rails. Suitable storm rails or hand grabs must be...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Storm rails. 169.329 Section 169.329 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Construction and Arrangement Rails and Guards § 169.329 Storm rails. Suitable storm rails or hand grabs must be...
Simulation of rail yard emissions transport to the near-source environment
Rail yards are critical nodes in the freight transportation network and locations of clustered emission sources. When people reside in close proximity to an active rail yard, the near-field effect of rail yard emissions is of concern. Field characterization of near-rail yard ai...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Construction and Arrangement Rails and Guards § 169.327 Deck rails. (a) All rails or lifelines must be at least 30 inches high... through bolted or welded to the deck. (b) Rails or lifelines must consist of evenly spaced courses. The...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Construction and Arrangement Rails and Guards § 169.327 Deck rails. (a) All rails or lifelines must be at least 30 inches high... through bolted or welded to the deck. (b) Rails or lifelines must consist of evenly spaced courses. The...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Deck rails. 169.327 Section 169.327 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Construction and Arrangement Rails and Guards § 169.327 Deck rails. (a) All rails or lifelines must be at least 30 inches high...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Deck rails. 169.327 Section 169.327 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Construction and Arrangement Rails and Guards § 169.327 Deck rails. (a) All rails or lifelines must be at least 30 inches high...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-22
...., Palm Beach Holdings, Inc., RailAmerica Transportation Corp., RailTex, Inc., Fortress Investment Group, LLC, and RR Acquisition Holding, LLC--Continuance in Control Exemption-- Conecuh Valley Railway, LLC...), Fortress Investment Group, LLC (Fortress), and RR Acquisition Holding, LLC (RR Acquisition) (collectively...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Storm rails. 177.920 Section 177.920 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) CONSTRUCTION AND ARRANGEMENT Rails and Guards § 177.920 Storm rails. Suitable storm rails or hand grabs must be...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Storm rails. 177.920 Section 177.920 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) CONSTRUCTION AND ARRANGEMENT Rails and Guards § 177.920 Storm rails. Suitable storm rails or hand grabs must be...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Storm rails. 108.221 Section 108.221 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Construction and Arrangement Rails § 108.221 Storm rails. Each unit must have a storm rail in the following...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Storm rails. 177.920 Section 177.920 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) CONSTRUCTION AND ARRANGEMENT Rails and Guards § 177.920 Storm rails. Suitable storm rails or hand grabs must be...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Storm rails. 108.221 Section 108.221 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Construction and Arrangement Rails § 108.221 Storm rails. Each unit must have a storm rail in the following...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Storm rails. 108.221 Section 108.221 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Construction and Arrangement Rails § 108.221 Storm rails. Each unit must have a storm rail in the following...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Storm rails. 108.221 Section 108.221 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Construction and Arrangement Rails § 108.221 Storm rails. Each unit must have a storm rail in the following...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Storm rails. 127.320 Section 127.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Rails and Guards § 127.320 Storm rails. Suitable storm rails must be installed in each passageway and at...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Storm rails. 127.320 Section 127.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Rails and Guards § 127.320 Storm rails. Suitable storm rails must be installed in each passageway and at...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Storm rails. 177.920 Section 177.920 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) CONSTRUCTION AND ARRANGEMENT Rails and Guards § 177.920 Storm rails. Suitable storm rails or hand grabs must be...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Storm rails. 127.320 Section 127.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Rails and Guards § 127.320 Storm rails. Suitable storm rails must be installed in each passageway and at...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Storm rails. 127.320 Section 127.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Rails and Guards § 127.320 Storm rails. Suitable storm rails must be installed in each passageway and at...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Storm rails. 177.920 Section 177.920 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) CONSTRUCTION AND ARRANGEMENT Rails and Guards § 177.920 Storm rails. Suitable storm rails or hand grabs must be...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Storm rails. 108.221 Section 108.221 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Construction and Arrangement Rails § 108.221 Storm rails. Each unit must have a storm rail in the following...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Storm rails. 127.320 Section 127.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Rails and Guards § 127.320 Storm rails. Suitable storm rails must be installed in each passageway and at...
NASA Astrophysics Data System (ADS)
Kassa, Elias; Nielsen, Jens C. O.
2009-03-01
A time domain solution method for general three-dimensional dynamic interaction of train and turnout (switch and crossing) that accounts for excitation in an extended frequency range (up to several hundred Hz) is proposed. Based on a finite element (FE) model of a standard turnout design, a complex-valued modal superposition of track dynamics is applied using the first 500 eigenmodes of the turnout model. The three-dimensional model includes the distribution of structural flexibility along the turnout, such as bending and torsion of rails and sleepers, and the variations in rail cross-section and sleeper length. Convergence of simulation results is studied while using an increasing number of eigenmodes. It is shown that modes with eigenfrequencies up to at least 200 Hz have a significant influence on the magnitudes of the wheel-rail contact forces. Results from using a simplified track model with a commercial computer program for low-frequency vehicle dynamics are compared with the results from using the detailed FE model in conjunction with the proposed method.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-09
...- modal freight and intelligent supply chain management, provides significant business [[Page 7154..., including port development, airport development, freight rail systems and technologies, supply chain systems... for U.S. engineers, program management firms, and manufacturers to contribute to the creation of new...
A System Dynamics Model for Integrated Decision Making: The Durham-Orange Light Rail Project
EPA’s Sustainable and Healthy Communities Research Program (SHC) is conducting transdisciplinary research to inform and empower decision-makers. EPA tools and approaches are being developed to enable communities to effectively weigh and integrate human health, socioeconomic, envi...
Passenger rail impact test. Volume 2 : summary of occupant protection program
DOT National Transportation Integrated Search
2003-07-01
On January 31, 2002, a train-to-train collision test was conducted involving a cab-car-led consist with three coach cars, all of conventional design, and a trailing locomotive traveling at 30 mph into a stationary locomotive coupled with two ballaste...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-19
... Carolina Department of Transportation Rail Division (NCDOT) and the Virginia Department of Rail and Public... Raleigh,'' in the subject heading; or Ms. Christine Fix, Department of Rail & Public Transportation, 600... Department of Rail and Public Transportation Office at 600 East Main Street, Suite 2102, Richmond, VA; and...
49 CFR 174.59 - Marking and placarding of rail cars.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 2 2012-10-01 2012-10-01 false Marking and placarding of rail cars. 174.59... RAIL General Handling and Loading Requirements § 174.59 Marking and placarding of rail cars. No person may transport a rail car carrying hazardous materials unless it is marked and placarded as required by...
49 CFR 174.59 - Marking and placarding of rail cars.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 2 2011-10-01 2011-10-01 false Marking and placarding of rail cars. 174.59... RAIL General Handling and Loading Requirements § 174.59 Marking and placarding of rail cars. No person may transport a rail car carrying hazardous materials unless it is marked and placarded as required by...
49 CFR 174.59 - Marking and placarding of rail cars.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 2 2014-10-01 2014-10-01 false Marking and placarding of rail cars. 174.59... RAIL General Handling and Loading Requirements § 174.59 Marking and placarding of rail cars. No person may transport a rail car carrying hazardous materials unless it is marked and placarded as required by...
49 CFR 174.59 - Marking and placarding of rail cars.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 2 2013-10-01 2013-10-01 false Marking and placarding of rail cars. 174.59... RAIL General Handling and Loading Requirements § 174.59 Marking and placarding of rail cars. No person may transport a rail car carrying hazardous materials unless it is marked and placarded as required by...
49 CFR 174.59 - Marking and placarding of rail cars.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 2 2010-10-01 2010-10-01 false Marking and placarding of rail cars. 174.59... RAIL General Handling and Loading Requirements § 174.59 Marking and placarding of rail cars. No person may transport a rail car carrying hazardous materials unless it is marked and placarded as required by...
46 CFR 72.40-10 - Storm rails.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Storm rails. 72.40-10 Section 72.40-10 Shipping COAST... and Guards § 72.40-10 Storm rails. (a) Suitable storm rails shall be installed in all passageways and at the deckhouse sides where passengers or crew might have normal access. Storm rails shall be...
46 CFR 72.40-10 - Storm rails.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 3 2013-10-01 2013-10-01 false Storm rails. 72.40-10 Section 72.40-10 Shipping COAST... and Guards § 72.40-10 Storm rails. (a) Suitable storm rails shall be installed in all passageways and at the deckhouse sides where passengers or crew might have normal access. Storm rails shall be...
46 CFR 72.40-10 - Storm rails.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 3 2011-10-01 2011-10-01 false Storm rails. 72.40-10 Section 72.40-10 Shipping COAST... and Guards § 72.40-10 Storm rails. (a) Suitable storm rails shall be installed in all passageways and at the deckhouse sides where passengers or crew might have normal access. Storm rails shall be...
46 CFR 72.40-10 - Storm rails.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 3 2012-10-01 2012-10-01 false Storm rails. 72.40-10 Section 72.40-10 Shipping COAST... and Guards § 72.40-10 Storm rails. (a) Suitable storm rails shall be installed in all passageways and at the deckhouse sides where passengers or crew might have normal access. Storm rails shall be...
46 CFR 72.40-10 - Storm rails.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 3 2014-10-01 2014-10-01 false Storm rails. 72.40-10 Section 72.40-10 Shipping COAST... and Guards § 72.40-10 Storm rails. (a) Suitable storm rails shall be installed in all passageways and at the deckhouse sides where passengers or crew might have normal access. Storm rails shall be...
49 CFR 212.231 - Highway-rail grade crossing inspector.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Highway-rail grade crossing inspector. 212.231... § 212.231 Highway-rail grade crossing inspector. (a) The highway-rail grade crossing inspector is required, at a minimum, to be able to conduct independent inspections of all types of highway-rail grade...
49 CFR 212.231 - Highway-rail grade crossing inspector.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Highway-rail grade crossing inspector. 212.231... § 212.231 Highway-rail grade crossing inspector. (a) The highway-rail grade crossing inspector is required, at a minimum, to be able to conduct independent inspections of all types of highway-rail grade...
49 CFR 212.231 - Highway-rail grade crossing inspector.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Highway-rail grade crossing inspector. 212.231... § 212.231 Highway-rail grade crossing inspector. (a) The highway-rail grade crossing inspector is required, at a minimum, to be able to conduct independent inspections of all types of highway-rail grade...
46 CFR 190.25-5 - Where rails required.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Where rails required. 190.25-5 Section 190.25-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS CONSTRUCTION AND ARRANGEMENT Rails and Guards § 190.25-5 Where rails required. (a) All vessels shall have efficient guard rails...
NCHRP report 350 test 3-11 of the modified T8 bridge rail.
DOT National Transportation Integrated Search
2009-04-01
A new flexible bridge rail system, referred to as the T8 rail, was designed as a replacement for the T6 rail in high-speed applications on culverts and thin deck structures. The T8 rail failed a crash test when the breakaway posts failed the thin dec...
77 FR 54655 - Genesee & Wyoming Inc.-Control-RailAmerica, Inc., et al.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-05
... & Wyoming Inc.--Control--RailAmerica, Inc., et al. AGENCY: Surface Transportation Board. ACTION: Decision No... August 6, 2012, by Genesee and Wyoming Inc. (GWI) and RailAmerica, Inc. (RailAmerica). The application seeks Board approval under 49 U.S.C. 11323-11325 of the acquisition of control of RailAmerica, a...
Optimization of wheel-rail interface friction using top-of-rail friction modifiers: State of the art
NASA Astrophysics Data System (ADS)
Khan, M. Roshan; Dasaka, Satyanarayana Murty
2018-05-01
High Speed Railways and Dedicated Freight Corridors are the need of the day for fast and efficient transportation of the ever growing population and freight across long distances of travel. With the increase in speeds and axle loads carried by these trains, wearing out of rails and train wheel sections are a common issue, which is due to the increase in friction at the wheel-rail interfaces. For the cases where the wheel-rail interface friction is less than optimum, as in case of high speed trains with very low axle loads, wheel-slips are imminent and loss of traction occurs when the trains accelerate rapidly or brake all of a sudden. These vast variety of traction problems around the wheel-rail interface friction need to be mitigated carefully, so that the contact interface friction neither ascents too high to cause material wear and need for added locomotive power, nor be on the lower side to cause wheel-slips and loss of traction at high speeds. Top-of-rail friction modifiers are engineered surface coatings applied on top of rails, to maintain an optimum frictional contact between the train wheels and the rails. Extensive research works in the area of wheel-rail tribology have revealed that the optimum frictional coefficients at wheel-rail interfaces lie at a value of around 0.35. Application of top-of-rail (TOR) friction modifiers on rail surfaces add an extra layer of material coating on top of the rails, with a surface frictional coefficient of the desired range. This study reviews the common types of rail friction modifiers, the methods for their application, issues related with the application of friction modifiers, and a guideline on selection of the right class of coating material based on site specific requirements of the railway networks.
NASA Astrophysics Data System (ADS)
Kaewunruen, Sakdirat
2015-04-01
Inevitably, rail squats and studs are continuing to be a serious problem for railway organisations around the world in the 21st century. They are typically classified as the growth of any cracks that have grown longitudinally through the subsurface and some of the cracks propagating to the bottom of rails transversely, and have branched from initial longitudinal cracks with a depression of rail surface. The horizontal crack, which results in a depression of rail surface, induces increased maintenance level, more frequent monitoring, compromised rail testing (as the crack shields the signal echoes), and possible broken rails. This paper presents field investigations using a magnetised-rail testing device developed by MRX Technologies to identify and prioritise the rail squats. Most of the in situ squats were found on the high rail of the transition (variable-radius curved track), which is associated with rolling contact fatigue (RCF). This investigation highlights the field performance of the MRX's surface crack detection technology in comparison with the traditional ultrasonic method and detailed walking inspection. Visually, it was found in the field that the size of the RCF squats varies from very small to moderate. The predicted crack data were obtained by scanning the magnitised rails. The comparison of the actual crack depths (ultrasonic) and the predicted crack depths (MRX device) shows: • A possible correlation for small RCF/ squat cracks. • Poor interpretation of larger defects and welds. The field assessment also suggests some practical issues required for further development, including the detection of rail spalling, deep transverse crack, welding, and so on.
Power System Implementation and Demonstration at Camp Katuu, Palau
2011-05-11
Horizontal Rows 3 Vertical Rows 3 Vertical Rows with Center Walkway 6 Vertical Rows 1 Amount of rail mounting (lf) 1440’ 1800’ 1800’ 1440’ 2 Ease of rail...installation some rail cutting required to clear walkway requires two level rail mounting system requires two level rail mounting system no rail...Maintenance access 21" horizontal & vertical walkway , does not have direct access to all panels Accessible with 15" walkways Direct access to each panel and
49 CFR 213.352 - Torch cut rail.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Torch cut rail. 213.352 Section 213.352... Torch cut rail. (a) Except as a temporary repair in emergency situations no rail having a torch cut end shall be used. When a rail end with a torch cut is used in emergency situations, train speed over that...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 1 2012-10-01 2012-10-01 false Remanufacture of intercity and commuter rail cars and purchase or lease of remanufactured intercity and commuter rail cars. 37.89 Section 37.89... commuter rail cars and purchase or lease of remanufactured intercity and commuter rail cars. (a) This...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 1 2013-10-01 2013-10-01 false Remanufacture of intercity and commuter rail cars and purchase or lease of remanufactured intercity and commuter rail cars. 37.89 Section 37.89... commuter rail cars and purchase or lease of remanufactured intercity and commuter rail cars. (a) This...
49 CFR 213.352 - Torch cut rail.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Torch cut rail. 213.352 Section 213.352... Torch cut rail. (a) Except as a temporary repair in emergency situations no rail having a torch cut end shall be used. When a rail end with a torch cut is used in emergency situations, train speed over that...
46 CFR 190.25-10 - Storm rails.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Storm rails. 190.25-10 Section 190.25-10 Shipping COAST... ARRANGEMENT Rails and Guards § 190.25-10 Storm rails. (a) On vessels in ocean and coastwise service, suitable storm rails shall be installed in all passageways and at the deckhouse sides where persons on board...
46 CFR 92.25-10 - Storm rails.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Storm rails. 92.25-10 Section 92.25-10 Shipping COAST... ARRANGEMENT Rails and Guards § 92.25-10 Storm rails. (a) On vessels in ocean and coastwise service, suitable storm rails shall be installed in all passageways and at the deckhouse sides where persons on board...
46 CFR 190.25-10 - Storm rails.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Storm rails. 190.25-10 Section 190.25-10 Shipping COAST... ARRANGEMENT Rails and Guards § 190.25-10 Storm rails. (a) On vessels in ocean and coastwise service, suitable storm rails shall be installed in all passageways and at the deckhouse sides where persons on board...
46 CFR 190.25-10 - Storm rails.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Storm rails. 190.25-10 Section 190.25-10 Shipping COAST... ARRANGEMENT Rails and Guards § 190.25-10 Storm rails. (a) On vessels in ocean and coastwise service, suitable storm rails shall be installed in all passageways and at the deckhouse sides where persons on board...
46 CFR 92.25-10 - Storm rails.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Storm rails. 92.25-10 Section 92.25-10 Shipping COAST... ARRANGEMENT Rails and Guards § 92.25-10 Storm rails. (a) On vessels in ocean and coastwise service, suitable storm rails shall be installed in all passageways and at the deckhouse sides where persons on board...
46 CFR 92.25-10 - Storm rails.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Storm rails. 92.25-10 Section 92.25-10 Shipping COAST... ARRANGEMENT Rails and Guards § 92.25-10 Storm rails. (a) On vessels in ocean and coastwise service, suitable storm rails shall be installed in all passageways and at the deckhouse sides where persons on board...
46 CFR 92.25-10 - Storm rails.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Storm rails. 92.25-10 Section 92.25-10 Shipping COAST... ARRANGEMENT Rails and Guards § 92.25-10 Storm rails. (a) On vessels in ocean and coastwise service, suitable storm rails shall be installed in all passageways and at the deckhouse sides where persons on board...
46 CFR 190.25-10 - Storm rails.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Storm rails. 190.25-10 Section 190.25-10 Shipping COAST... ARRANGEMENT Rails and Guards § 190.25-10 Storm rails. (a) On vessels in ocean and coastwise service, suitable storm rails shall be installed in all passageways and at the deckhouse sides where persons on board...
46 CFR 190.25-10 - Storm rails.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Storm rails. 190.25-10 Section 190.25-10 Shipping COAST... ARRANGEMENT Rails and Guards § 190.25-10 Storm rails. (a) On vessels in ocean and coastwise service, suitable storm rails shall be installed in all passageways and at the deckhouse sides where persons on board...
46 CFR 92.25-10 - Storm rails.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Storm rails. 92.25-10 Section 92.25-10 Shipping COAST... ARRANGEMENT Rails and Guards § 92.25-10 Storm rails. (a) On vessels in ocean and coastwise service, suitable storm rails shall be installed in all passageways and at the deckhouse sides where persons on board...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-14
... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35725] MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad-- Operation Exemption--Hilco SP Rail, LLC MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad (MCM), a noncarrier, has filed a verified notice of exemption...
76 FR 16538 - Solid Waste Rail Transfer Facilities
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-24
... circumstances. Upon receiving a land-use-exemption permit issued by the Board, a solid waste rail transfer... new application for a land-use-exemption permit if the rail line associated with the solid waste rail... transportation of solid waste by rail. (2) The Board will not grant a land-use-exemption permit for a solid waste...
2014-06-01
SCADA / ICS Cyber Test Lab initiated in 2013 Psychosocial – academic research exists,; opportunity for sharing and developing impact assessment...ecosystems and species at risk), accidents / system failure (rail; pipelines ; ferries CSSP strategy for the North Focus on regional l(and local) problem...Guidance; business planning; environmental scan; proposal evaluation; and performance measurement Program Risk Management – Guidelines for project
NASA Astrophysics Data System (ADS)
Suárez, B.; Rodriguez, P.; Vázquez, M.; Fernández, I.
2012-01-01
Vehicle-track interaction for a new resilient slab track designed to reduce noise and vibration levels was analysed, in order to assess the derailment risk on a curved track when encountering a broken rail. Sensitivity of the rail support spacing of the relative position of the rail breakage between two adjacent rail supports and of running speed were analysed for two different elasticities of the rail fastening system. In none of the cases analysed was observed an appreciable difference between either of the elastic systems. As was expected, the most unfavourable situations were those with greater rail support spacing and those with greater distance from the breakage to the nearest rail support, although in none of the simulations performed did a derailment occur when running over the broken rail. When varying the running speed, the most favourable condition was obtained for an intermediate speed, due to the superposition of two antagonistic effects.
About Losses in Pumping Generators of High-Power Electrodischarge Excimer Lasers
NASA Astrophysics Data System (ADS)
Ivanov, N. G.; Losev, V. F.
2015-04-01
Energy losses in pumping systems of discharge high-power lasers are investigated. To estimate the losses, the discharge circuit operation was modeled, and its calculation was performed using the program PSpice. Results of measurements and calculations demonstrate that the resistance of a rail gap with electric field distortion exceeds several times the resistance of a single-channel gap without field distortion. A difference in the resistances is explained by different mechanisms of discharge burning: in the first case diffusion mechanism and in the second case the spark mechanism. The low efficiency of the high-power excimer lasers (~1%) is explained by high energy losses in the rail gap that reach more than 50% of the initially stored energy.
NASA Astrophysics Data System (ADS)
Mazilu, Traian
2010-09-01
This paper herein describes the interaction between a simple moving vehicle and an infinite periodically supported rail, in order to signalise the basic features of the vehicle/track vibration behaviour in general, and wheel/rail vibration, in particular. The rail is modelled as an infinite Timoshenko beam resting on semi-sleepers via three-directional rail pads and ballast. The time-domain analysis was performed applying Green's matrix of the track method. This method allows taking into account the nonlinearities of the wheel/rail contact and the Doppler effect. The numerical analysis is dedicated to the wheel/rail response due to two types of excitation: the steady-state interaction and rail irregularities. The study points out to certain aspects regarding the parametric resonance, the amplitude-modulated vibration due to corrugation and the Doppler effect.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Eligibility. 262.7 Section 262.7 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION IMPLEMENTATION OF PROGRAM FOR CAPITAL GRANTS FOR RAIL LINE RELOCATION AND IMPROVEMENT PROJECTS § 262.7 Eligibility. (a) A State is...
DOT National Transportation Integrated Search
2011-09-01
This report presents the test results and finite element correlations of a full-scale dynamic collision test with rail vehicles as part of the Federal Railroad Administrations research program on improved crashworthiness of locomotive structures. ...
Development of an Automated Emergency Response System (AERS) for Rail Transit Systems
DOT National Transportation Integrated Search
1984-10-01
As a result of a fire in 1979 at the Bay Area Rapid Transit District (BART), a microprocessor-based information retrieval system was developed to aid in the emergency decision-making process. This system was proposed, designed and programmed by a sup...
76 FR 17185 - Environmental Impact Statement: Cook County, IL
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-28
...) will be prepared for the Grand Crossing Rail Project, which involves new railroad track work, structural work, grading, and signal improvements to provide a new direct route for Amtrak trains from New... project is an element of the overall Chicago Region Environmental and Transportation Efficiency Program...
Determination of minimum height and lateral design load for MASH test level 4 bridge rails.
DOT National Transportation Integrated Search
2011-12-01
The Manual for Assessing Safety Hardware (MASH) prescribes higher design vehicle impact speed and mass for test level 4 barriers compared to its predecessor National Cooperative Highway Research Program (NCHRP) Report 350. This has resulted in a 56 p...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
... Railroad Tank Cars in Excess of 263,000 Pounds Gross Rail Load; Approval AGENCY: Federal Railroad... certain railroad tank cars in excess of 263,000 pounds gross rail load. SUMMARY: On May 14, 2010, the... to allow certain rail tank cars, transporting hazardous materials, to exceed the gross weight on rail...
Code of Federal Regulations, 2010 CFR
2010-10-01
... entities operating rapid or light rail systems. 37.79 Section 37.79 Transportation Office of the Secretary... operating rapid or light rail systems. Each public entity operating a rapid or light rail system making a... system shall ensure that the vehicle is readily accessible to and usable by individuals with disabilities...
Code of Federal Regulations, 2012 CFR
2012-10-01
... entities operating rapid or light rail systems. 37.79 Section 37.79 Transportation Office of the Secretary... operating rapid or light rail systems. Each public entity operating a rapid or light rail system making a... system shall ensure that the vehicle is readily accessible to and usable by individuals with disabilities...
Code of Federal Regulations, 2013 CFR
2013-10-01
... entities operating rapid or light rail systems. 37.79 Section 37.79 Transportation Office of the Secretary... operating rapid or light rail systems. Each public entity operating a rapid or light rail system making a... system shall ensure that the vehicle is readily accessible to and usable by individuals with disabilities...
Code of Federal Regulations, 2014 CFR
2014-10-01
... entities operating rapid or light rail systems. 37.79 Section 37.79 Transportation Office of the Secretary... operating rapid or light rail systems. Each public entity operating a rapid or light rail system making a... system shall ensure that the vehicle is readily accessible to and usable by individuals with disabilities...
Code of Federal Regulations, 2011 CFR
2011-10-01
... entities operating rapid or light rail systems. 37.79 Section 37.79 Transportation Office of the Secretary... operating rapid or light rail systems. Each public entity operating a rapid or light rail system making a... system shall ensure that the vehicle is readily accessible to and usable by individuals with disabilities...
NASA Astrophysics Data System (ADS)
Sakamoto, Yasuaki; Kashiwagi, Takayuki; Hasegawa, Hitoshi; Sasakawa, Takashi; Fujii, Nobuo
The eddy current rail brake is a type of braking system used in railway vehicles. Because of problems such as rail heating and problems associated with ensuring that power is supplied when the feeder malfunctions, this braking system has not been used for practical applications in Japan. Therefore, we proposed the use of linear induction motor (LIM) technology in eddy current rail brake systems. The LIM rail brake driven by dynamic braking can reduce rail heating and generate the energy required for self-excitation. In this paper, we present an excitation system and control method for the LIM rail brake driven by “dynamic braking with zero electrical output”. The proposed system is based on the concept that the LIM rail brake can be energized without using excitation power sources such as a feeder circuit and that high reliability can be realized by providing an independent excitation system. We have studied this system and conducted verification tests using a prototype LIM rail brake on a roller rig. The results show that the system performance is adequate for commercializing the proposed system, in which the LIM rail brake is driven without using any excitation power source.
NASA Astrophysics Data System (ADS)
Mazilu, Traian
2017-08-01
This paper approaches the issue of the interaction between moving tandem wheels and an infinite periodically supported rail and points out at the basic characteristics in the steady-state interaction behaviour and in the interaction in the presence of the rail random irregularity. The rail is modelled as an infinite Timoshenko beam resting on supports which are discretely modelling the inertia of the sleepers and ballast and also the viscoelastic features of the rail pads, the ballast and the subgrade. Green‧s matrices of the track method in stationary reference frame were applied so as to conduct the time-domain analysis. This method allows to consider the nonlinearities of the wheel/rail contact and the Doppler effect. The study highlights certain aspects regarding the influence of the wheel base on the wheels/rail contact forces, particularly at the parametric resonance, due to the coincidence between the wheel/rail natural frequency and the passing frequency and also when the rail surface exhibits random irregularity. It has been shown that the wheel/rail dynamic behaviour is less intense when the wheel base equals integer multiple of the sleeper bay.
DOT National Transportation Integrated Search
2009-07-08
The 2009 Indiana Rail Plan was developed as part of the Indiana Multimodal Freight and Mobility Plan to direct the State of Indianas future freight and passenger rail policy, provide a framework to guide future decisions regarding rail system inve...
Preliminary national rail plan.
DOT National Transportation Integrated Search
2009-10-15
The Passenger Rail Investment and Improvement Act of 2008 (PRIIA) directed the Administrator of the Federal Railroad Administration (FRA) to develop a Preliminary National Rail Plan (PNRP or Preliminary Plan) to address the rail needs of the Nation. ...
Transportation, social and financial impacts of light and commuter rail.
DOT National Transportation Integrated Search
2009-09-01
While transportation impacts are often masked by heavy growth in corridor traffic and latent travel demand, : modeling enables measuring the real transportation impacts of rail projects. Rail transit is both safe and : environmentally friendly. Rail ...
Code of Federal Regulations, 2010 CFR
2010-10-01
... point to the stock rail. Broken or cracked switch point rails will be subject to the requirements of... of the stock rail. (d) The heel of each switch rail shall be secure and the bolts in each heel shall...
Code of Federal Regulations, 2011 CFR
2011-10-01
... point to the stock rail. Broken or cracked switch point rails will be subject to the requirements of... of the stock rail. (d) The heel of each switch rail shall be secure and the bolts in each heel shall...
Potential scenarios of concern for high speed rail operations
DOT National Transportation Integrated Search
2011-03-16
Currently, multiple operating authorities are proposing the : introduction of high-speed rail service in the United States. : While high-speed rail service shares a number of basic : principles with conventional-speed rail service, the operational : ...
Rail Integrity Experience on the Washington Metro System
DOT National Transportation Integrated Search
2016-04-12
The Washington Metropolitan Area Transit Authority (WMATA) provides passenger rail service to the nations capital. Although the rail system carries only passenger trains, the rail integrity issues that WMATA must manage are similar to those that f...
Review of Rail Behavior Under Wheel/Rail Impact Loading
DOT National Transportation Integrated Search
1986-04-01
The report discusses several studies involving factors that significantly affect rail life, particularly wheel impact loads. Parameters that characterize the effect of wheel impact loads on rail behavior are examined in terms of system variables such...
Analysis of Lateral Rail Restraint.
DOT National Transportation Integrated Search
1983-09-01
This report deals with the analysis of lateral rail strength using the results of experimental investigations and a nonlinear rail response model. Part of the analysis involves the parametric study of the influence of track parameters on lateral rail...
Rail base corrosion and cracking prevention
DOT National Transportation Integrated Search
2014-07-01
Rail base corrosion combined with fatigue or damage can significantly reduce rail life. Studies were done to examine the relative contribution of damage, corrosion, and fatigue on rail life. The combined effects can be separated into constituent fact...
Study on service performance of 880 MPa-grade and 980 MPa-grade rail steels
NASA Astrophysics Data System (ADS)
Zhu, M.; Xu, G.; Zhou, J. H.; Wang, R. M.; Gan, X. L.
2017-09-01
With the rapid development of economy in China, the requirement for railway passenger and cargo transportation becomes higher and higher. Increasing speed and developing heavy-haul transportation can effectively improve the transportation capacity of railway. The requirement for rail steels with higher ability of abrasion resistance becomes urgent. Two kinds of rails, i.e., 880 MPa-grade and 980 MPa-grade rail steels, were laid on cargo line with 500 m short radius curve. The service performances of the tested steels were continuously tracked and analyzed during operation of total 22.5 million tons loads. Macro morphology, light band width, surface hardness and profile of rails were investigated. The results show that the performance of 980 MPa-grade rail steel is superior to that of 880 MPa-grade rail steel at same circumstance. Therefore, 980 MPa-grade rail should be selected in the cargo line with small radius curve.
Testing of the fracture resistance of rails
NASA Astrophysics Data System (ADS)
Swiderski, Zdzislaw
Various grades of rail steel as well as whole rail sections were subjected to fracture resistance tests according to the unified method. It was found that heat treatment of rails increased fracture resistance by 50 percent. However, residual stresses also had a substantial effect. Apparent durability values N(sub c) from the Wilson formula have been derived. The influence of residual stresses on rail durability is stated.
77 FR 12182 - Safety Standard for Portable Bed Rails: Final Rule
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-29
... of ASTM F2085- 10a, comply with the following: (i) 1.4.1 Foam and inflatable bed rails need meet only...--portable bed rail constructed primarily of nonrigid materials such as fabric or foam. 3.1.11 inflatable bed..., inflatable bed rail, are terms that are now incorporated as non-rigid bed rail under new section 3.1.12 in...
Code of Federal Regulations, 2010 CFR
2010-10-01
... entities operating rapid or light rail systems. 37.81 Section 37.81 Transportation Office of the Secretary... operating rapid or light rail systems. (a) Except as provided elsewhere in this section, each public entity operating a rapid or light rail system which, after August 25, 1990, purchases or leases a used rapid or...
Code of Federal Regulations, 2012 CFR
2012-10-01
... entities operating rapid or light rail systems. 37.81 Section 37.81 Transportation Office of the Secretary... operating rapid or light rail systems. (a) Except as provided elsewhere in this section, each public entity operating a rapid or light rail system which, after August 25, 1990, purchases or leases a used rapid or...
Code of Federal Regulations, 2011 CFR
2011-10-01
... entities operating rapid or light rail systems. 37.81 Section 37.81 Transportation Office of the Secretary... operating rapid or light rail systems. (a) Except as provided elsewhere in this section, each public entity operating a rapid or light rail system which, after August 25, 1990, purchases or leases a used rapid or...
Code of Federal Regulations, 2013 CFR
2013-10-01
... entities operating rapid or light rail systems. 37.81 Section 37.81 Transportation Office of the Secretary... operating rapid or light rail systems. (a) Except as provided elsewhere in this section, each public entity operating a rapid or light rail system which, after August 25, 1990, purchases or leases a used rapid or...
Code of Federal Regulations, 2014 CFR
2014-10-01
... entities operating rapid or light rail systems. 37.81 Section 37.81 Transportation Office of the Secretary... operating rapid or light rail systems. (a) Except as provided elsewhere in this section, each public entity operating a rapid or light rail system which, after August 25, 1990, purchases or leases a used rapid or...
Rail and Motor Outloading Capability Study. Fort Devens, Massachusetts,
1980-03-01
AD-AI 765 MILITARY TRAFFIC MANAGEMENT COMMAND TRANSPORTATION EN-ETC FIO 15/5 RAIL AND MOTOR OUTLOADING CAPABILITY STUDY. FORT DEVENS . MASSAC-ETC(U...REPORT TE 79-4-54 RAIL AND MOTOR OUTLOADING CAPABILITY STUDY FORT DEVENS , MASSACHUSETTS Accession Far DTIC TAB March 1980 _stribution/ Av_alability...INTRODUCTION 6.. . .. . . II. ANALYSIS OF FORT DEVENS ’ RAIL OUTLOADING FACILITIES ... . . .. . .9 A. General .9.. B. Rail Facility Description
Brown, Barbara B.; Tribby, Calvin P.; Tharp, Doug; Flick, Kristi; Miller, Harvey J.; Smith, Ken R.; Jensen, Wyatt
2015-01-01
Many communities in the United States have been adding new light rail to bus-predominant public transit systems. However, there is disagreement as to whether opening light rail lines attracts new ridership or merely draws ridership from existing transit users. We study a new light rail line in Salt Lake City, Utah, USA, which is part of a complete street redevelopment. We utilize a pre-test post-test control group quasi-experimental design to test two different measures of ridership change. The first measure is calculated from stops along the light rail route; the second assumes that nearby bus stops might be displaced by the rail and calculates ridership change with those stops included as baseline. Both the simple measure (transit use changes on the complete street light rail corridor) and the “displacement” measure (transit use changes in the one-quarter mile catchment areas around new light rail stops) showed significant (p < .01) and substantial (677%) increases in transit passengers compared to pre-light rail bus users. In particular, the displacement analysis discredits a common challenge that when a new light rail line opens, most passengers are simply former bus riders whose routes were canceled in favor of light rail. The study suggests that light rail services can attract additional ridership to public transit systems. In addition, although pre-post control-group designs require time and effort, this project underscores the benefits of such quasi-experimental designs in terms of the strength of the inferences that can be drawn about the impacts of new transit infrastructure and services. PMID:26543329
Werner, Carol M; Brown, Barbara B; Tribby, Calvin P; Tharp, Doug; Flick, Kristi; Miller, Harvey J; Smith, Ken R; Jensen, Wyatt
2016-01-01
Many communities in the United States have been adding new light rail to bus-predominant public transit systems. However, there is disagreement as to whether opening light rail lines attracts new ridership or merely draws ridership from existing transit users. We study a new light rail line in Salt Lake City, Utah, USA, which is part of a complete street redevelopment. We utilize a pre-test post-test control group quasi-experimental design to test two different measures of ridership change. The first measure is calculated from stops along the light rail route; the second assumes that nearby bus stops might be displaced by the rail and calculates ridership change with those stops included as baseline. Both the simple measure (transit use changes on the complete street light rail corridor) and the "displacement" measure (transit use changes in the one-quarter mile catchment areas around new light rail stops) showed significant ( p < .01) and substantial (677%) increases in transit passengers compared to pre-light rail bus users. In particular, the displacement analysis discredits a common challenge that when a new light rail line opens, most passengers are simply former bus riders whose routes were canceled in favor of light rail. The study suggests that light rail services can attract additional ridership to public transit systems. In addition, although pre-post control-group designs require time and effort, this project underscores the benefits of such quasi-experimental designs in terms of the strength of the inferences that can be drawn about the impacts of new transit infrastructure and services.
Investigation into the vibration of metro bogies induced by rail corrugation
NASA Astrophysics Data System (ADS)
Ling, Liang; Li, Wei; Foo, Elbert; Wu, Lei; Wen, Zefeng; Jin, Xuesong
2017-01-01
The current research of rail corrugation mainly focuses on the mechanisms of its formation and development. Compared with the root causes and development mechanisms, the wheel-rail impacts, the fatigue failure of vehicle-track parts, and the loss of ride comfort due to rail corrugation should also be taken into account. However, the influences of rail corrugation on vehicle and track vibration, and failure of vehicle and track structural parts are barely discussed in the literature. This paper presents an experimental and numerical investigation of the structural vibration of metro bogies caused by rail corrugation. Extensive experiments are conducted to investigate the effects of short-pitch rail corrugation on the vibration accelerations of metro bogies. A dynamic model of a metro vehicle coupled with a concrete track is established to study the influence of rail corrugation on the structural vibration of metro bogies. The field test results indicate that the short-pitch rail corrugation generates strong vibrations on the axle-boxes and the bogie frames, therefore, accelerates the fatigue failure of the bogie components. The numerical results show that short-pitch rail corrugation may largely reduce the fatigue life of the coil spring, and improving the damping value of the primary vertical dampers is likely to reduce the strong vibration induced by short-pitch rail corrugation. This research systematically studies the effect of rail corrugation on the vibration of metro bogies and proposes some remedies for mitigating strong vibrations of metro bogies and reducing the incidence of failure in primary coil springs, which would be helpful in developing new metro bogies and track maintenance procedures.
76 FR 19914 - Safety Standard for Portable Bed Rails: Notice of Proposed Rulemaking
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-11
... constructed primarily of nonrigid materials, such as fabric or foam. An ``inflatable bed rail'' is defined as..., such as fabric or foam; Inflatable bed rail is a portable bed rail constructed primarily of nonrigid...
49 CFR 213.119 - Continuous welded rail (CWR); plan contents.
Code of Federal Regulations, 2010 CFR
2010-10-01
... following items: (i) Loose, bent, or missing joint bolts; (ii) Rail end batter or mismatch that contributes... amount and length of rail end batter or ramp on each rail end; the amount of tread mismatch; the vertical...
49 CFR 213.119 - Continuous welded rail (CWR); plan contents.
Code of Federal Regulations, 2011 CFR
2011-10-01
... following items: (i) Loose, bent, or missing joint bolts; (ii) Rail end batter or mismatch that contributes... amount and length of rail end batter or ramp on each rail end; the amount of tread mismatch; the vertical...
Analysis of Rail Transit Vehicle Dynamic Curving Performance
DOT National Transportation Integrated Search
1984-06-01
An analytical model is developed for determining the dynamic curving performance of rail transit vehicles. The dynamic wheel/rail interaction forces, vehicle suspension and body motions and track displacement are computed, as well as wheel and rail w...
Control of rolling contact fatigue on premium rails in revenue service.
DOT National Transportation Integrated Search
2014-11-01
Effective rail maintenance strategies are : essential for controlling rolling contact fatigue : (RCF) and reducing wear of rails under heavy : axle load (HAL) operations. In an effort to : optimize rail maintenance strategies in revenue : service, Tr...
Another look at the question of density and rail transit.
DOT National Transportation Integrated Search
2011-07-01
Long community discussions about rail often include whether a citys spatial distribution of : housing, employment and other trip generators is conducive to supporting rail transit. A citys : decision to construct rail transit is based on an arr...
A desire named streetcar : fantasy and fact in rail transit planning
DOT National Transportation Integrated Search
1992-06-30
The forecasts that led local officials in eight U.S. cities to advocate rail transit projects over competing, less capital-intensive options grossly overestimated rail transit ridership and underestimated rail construction costs and operating expense...
Undergraduate Certificate in Rail Transportation/Engineering.
DOT National Transportation Integrated Search
2016-05-05
A shift in the U.S. transportation environment has led to a revival in rail transport, especially in : freight rail1. In the meantime, an aging rail employee demographic presents a severe threat to : sufficient level of individuals equipped to handle...
Hazardous Materials Flow by Rail
DOT National Transportation Integrated Search
1990-03-01
The report presents a quantitative overview of the movement of hazardous materials by rail in the United States. The data used is a hazardous materials rail waybill sample developed at TSC from the 1983 Rail Waybill Sample. The report examines (1) th...
Interactive Simulator Training in Civil Construction: Evaluation from the Trainer's Perspective
ERIC Educational Resources Information Center
Tichon, Jennifer; Diver, Phil
2012-01-01
The popularity of simulators to augment training programs for operators of heavy machinery has been growing across several industries including mining, rail and more recently construction. High-fidelity, interactive simulation is typically achieved through complete immersion in brief, stressful and complex VR scenarios. The use of simulation…
Field Testing of High Degree Revenue Service Track for Buckling Safety Assessment
DOT National Transportation Integrated Search
1995-01-01
This report presents the results of a field study of high degree curves in continuous welded rail (CWR) territory. This program was conducted at two test sites: a 10 degree curve on the Atchison, Topeka, and Santa Fe (ATSF) Railroad near Sante Fe, NM...
DOT National Transportation Integrated Search
2001-09-01
High-speed trains in the speed range of 100 to 160 mph require tracks of nearly perfect geometry and mechanical uniformity, when subjected to moving wheel loads. Therefore, this report briefly describes the remedies being used by various railroads to...
49 CFR 262.13 - Matching requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF TRANSPORTATION IMPLEMENTATION OF PROGRAM FOR CAPITAL GRANTS FOR RAIL LINE RELOCATION AND... least ten percent of the construction costs of a project that is funded in part by the grant awarded... the State or other non-Federal entity or allowable costs, calculated on the basis of costs incurred by...
DOT National Transportation Integrated Search
2007-08-01
Commuter rail is increasingly popular as a means to introduce rail transportation to metropolitan transportation systems. The long-term benefits of commuter rail include the addition of capacity to the transportation system, providing a quality commu...
On-line high-speed rail defect detection.
DOT National Transportation Integrated Search
2004-10-01
This report presents the results of phase 2 of the project On-line high-speed rail defect detection aimed at improving the reliability and the speed of current defect detection in rails. Ultrasonic guided waves, traveling in the rail running di...
DOT National Transportation Integrated Search
1998-06-01
The principles of heat transfer are applied to analyze the so-called "rail chill" effect, which refers to hear loss by conduction from a hot rail vehicle wheel through the contact area into a cold rail, the wheel having been heated by friction brakin...
Home school student visit and introduction to rail transportation and engineering.
DOT National Transportation Integrated Search
2016-06-22
This project consisted of hosting local Champaign-Urbana, Illinois home school students for a visit to : the Rail Transportation and Engineering Center (RailTEC) at the University of Illinois at Urbana- : Champaign (UIUC). Beyond visiting RailTEC, st...
49 CFR 236.711 - Bond, rail joint.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Bond, rail joint. 236.711 Section 236.711 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Bond, rail joint. A metallic connection attached to adjoining rails to insure electrical conductivity. ...
49 CFR 236.752 - Joint, rail, insulated.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Joint, rail, insulated. 236.752 Section 236.752 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Joint, rail, insulated. A joint in which electrical insulation is provided between adjoining rails. ...
Rail accelerator research at Lewis Research Center
NASA Technical Reports Server (NTRS)
Kerslake, W. R.; Cybyk, B. Z.
1982-01-01
A rail accelerator was chosen for study as an electromagnetic space propulsion device because of its simplicity and existing technology base. The results of a mission feasibility study using a large rail accelerator for direct launch of ton-size payloads from the Earth's surface to space, and the results of initial tests with a small, laboratory rail accelerator are presented. The laboratory rail accelerator has a bore of 3 by 3 mm and has accelerated 60 mg projectiles to velocities of 300 to 1000 m/s. Rail materials of Cu, W, and Mo were tested for efficiency and erosion rate.
A Big Data Analysis Approach for Rail Failure Risk Assessment.
Jamshidi, Ali; Faghih-Roohi, Shahrzad; Hajizadeh, Siamak; Núñez, Alfredo; Babuska, Robert; Dollevoet, Rolf; Li, Zili; De Schutter, Bart
2017-08-01
Railway infrastructure monitoring is a vital task to ensure rail transportation safety. A rail failure could result in not only a considerable impact on train delays and maintenance costs, but also on safety of passengers. In this article, the aim is to assess the risk of a rail failure by analyzing a type of rail surface defect called squats that are detected automatically among the huge number of records from video cameras. We propose an image processing approach for automatic detection of squats, especially severe types that are prone to rail breaks. We measure the visual length of the squats and use them to model the failure risk. For the assessment of the rail failure risk, we estimate the probability of rail failure based on the growth of squats. Moreover, we perform severity and crack growth analyses to consider the impact of rail traffic loads on defects in three different growth scenarios. The failure risk estimations are provided for several samples of squats with different crack growth lengths on a busy rail track of the Dutch railway network. The results illustrate the practicality and efficiency of the proposed approach. © 2017 The Authors Risk Analysis published by Wiley Periodicals, Inc. on behalf of Society for Risk Analysis.
Effects of anchoring and arc structure on the control authority of a rail plasma actuator
NASA Astrophysics Data System (ADS)
Choi, Young-Joon; Gray, Miles; Sirohi, Jayant; Raja, Laxminarayan L.
2017-09-01
Experiments were conducted on a rail plasma actuator (RailPAc) with different electrode cross sections (rails or rods) to assess methods to improve the actuation authority, defined as the impulse generated for a given electrical input. The arc was characterized with electrical measurements and high-speed images, while impulse measurements quantified the actuation authority. A RailPAc power supply capable of delivering ∼1 kA of current at ∼100 V was connected to rod electrodes (free-floating with circular cross-section) and rail electrodes (flush-mounted in a flat plate with rectangular cross-section). High-speed images show that the rail electrodes cause the arc to anchor itself to the anode electrode and transit in discrete jumps, while rod electrodes permit the arc to transit smoothly without anchoring. The impulse measurements reveal that the anchoring reduces the actuation authority by ∼21% compared to a smooth transit, and the effect of anchoring can be suppressed by reducing the gap between the rails to 2 mm. The study further demonstrates that if a smooth transit is achieved, the control authority can be increased with a larger gap and larger arc current. In conclusion, the actuation authority of a RailPAc can be maximized by carefully choosing a gap width that prevents anchoring. Further study is warranted to increase the RailPAc actuation authority by introducing multiple turns of wires beneath the RailPAc to augment the induced magnetic field.
Midwest regional rail system : a transportation network for the 21 century : executive report
DOT National Transportation Integrated Search
2000-02-01
The Midwest Regional Rail Initiative is an ongoing effort to develop an improved and expanded passenger rail system in the Midwest. Since 1996, the Midwest Regional Rail Initiative (MWRRI) advanced from a series of service concepts, including increas...
36 CFR Appendix F to Part 1191 - Modifications Adopted by the Department of Transportation
Code of Federal Regulations, 2010 CFR
2010-07-01
... negotiate steps may have to travel compared to the general public. Modification to 406 of Appendix D 406... shall be 8 inches (205 mm) minimum above top of rail. In light rail, commuter rail, and intercity rail...
Wheel/Rail Noise Control : A Critical Evaluation
DOT National Transportation Integrated Search
1981-01-01
Noise and vibration are the major sources of environmental impact from urban rail transit operations, and is a concern for both new and existing systems. One of the primary sources of noise on rail transit systems is wheel/rail noise, or, the noise e...
Wheel/Rail Noise and Vibration : Volume 1. Mechanics of Wheel Rail Noise Generation.
DOT National Transportation Integrated Search
1975-05-01
The final reports are reported of a project to develop a basic understanding of urban transit wheel/rail noise control measures. Analytical models of impedance, response, radiation efficiency, and directivity of wheels and rails are presented and com...
75 FR 17462 - Quarterly Rail Cost Adjustment Factor
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-06
... decision may be purchased by contacting the office of Public Assistance, Governmental Affairs, and...-2)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the second quarter 2010 Rail Cost...
Rail transportation : Federal Railroad Administration's new approach to rail safety
DOT National Transportation Integrated Search
1997-07-01
In 1980, the Congress passed the Staggers Rail Act, which fostered substantial changes in the railroad industry. By 1995, fewer large freight railroads accounted for most of the industry's revenue and train miles. At the same time, these freight rail...
78 FR 57450 - State Rail Plan Guidance
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-18
... development of State rail plans, as appropriate. A commenter recommended that the FRA Regional Manager be... integration of State rail plan development within the statewide/nonmetropolitan transportation planning... Guidance is to describe the processes for the development, submission, and acceptance of State rail plans...
In-Service Performance and Costs of Methods to Control Urban Rail System Noise
DOT National Transportation Integrated Search
1979-12-01
This study evaluates the acoustic and economic effectiveness of five methods of controlling wheel/rail noise and vibration on urban rail transit systems, namely: rail grinding, wheel truing, resilient wheels, ring-damped wheels, and welded vs. jointe...
DOT National Transportation Integrated Search
1978-11-01
The seminar was organized at the request of UMTA to disseminate accurate information on, and experience with, composite (aluminum and steel) third, or contact rail, in wayside power distribution systems of electrified urban rail properties. The semin...
Wheel/Rail Noise and Vibration : Volume 2. Applications to Control of Wheel/Rail Noise.
DOT National Transportation Integrated Search
1975-05-01
The final reports are reported of a project to develop a basic understanding of urban transit wheel/rail noise control measures. Analytical models of impedance, response, radiation efficiency, and directivity of wheels and rails are presented and com...
76 FR 59483 - Quarterly Rail Cost Adjustment Factor
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-26
... the decision may be purchased by contacting the Office of Public Assistance, Governmental Affairs, and...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the fourth quarter 2011 Rail Cost Adjustment...
Effect of Wheel/Rail Loads on Concrete Tie Stresses and Rail Rollover.
DOT National Transportation Integrated Search
2011-09-21
As a result of vertical and lateral wheel/rail forces, high contact stresses can develop at the interface between the rail base and tie. Under certain conditions, these stresses can exceed the strength of the concrete tie and result in deterioration ...
77 FR 68722 - National Highway-Rail Crossing Inventory Reporting Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-16
...-0007, Notice No. 2] RIN 2130-AC26 National Highway-Rail Crossing Inventory Reporting Requirements... Notice of Proposed Rulemaking (NPRM) on National Highway-Rail Crossing Inventory Reporting Requirements... National Highway-Rail Crossing Inventory (Crossing Inventory). This notice announces the scheduling of the...
77 FR 48591 - State Rail Plan Guidance
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-14
... Plan Guidance AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Request for Public Comment on Proposed State Rail Plan Guidance. SUMMARY: FRA is publishing this notice to... plans. State rail plans are documents that are required under Section 303 of the Passenger Rail...
DOT National Transportation Integrated Search
1975-02-01
Rail fasteners for concrete ties and direct fixation and bolted rail joints have been identified as key components for improving track performance. However, the lack of statistical load data limits the development of improved design criteria and eval...
Pedestrian/bicyclist warning devices and signs at highway-rail and pathway-rail grade crossings.
DOT National Transportation Integrated Search
2013-04-01
Federal reporting shows a relatively constant number of pedestrian and bicycle fatalities at highway-rail and : pathway-rail grade crossings over the past 10 years. This is in contrast to a marked decrease in trainvehicle : collisions at highway-r...
49 CFR 1580.101 - Rail security coordinator.
Code of Federal Regulations, 2012 CFR
2012-10-01
... the corporate level. (d) Each freight railroad carrier, rail hazardous materials shipper, and rail hazardous materials receiver required to have an RSC must provide to TSA the names, title, phone number(s... any of this information changes. (e) Each freight railroad carrier, rail hazardous materials shipper...
49 CFR 1580.101 - Rail security coordinator.
Code of Federal Regulations, 2013 CFR
2013-10-01
... the corporate level. (d) Each freight railroad carrier, rail hazardous materials shipper, and rail hazardous materials receiver required to have an RSC must provide to TSA the names, title, phone number(s... any of this information changes. (e) Each freight railroad carrier, rail hazardous materials shipper...
49 CFR 1580.101 - Rail security coordinator.
Code of Federal Regulations, 2014 CFR
2014-10-01
... the corporate level. (d) Each freight railroad carrier, rail hazardous materials shipper, and rail hazardous materials receiver required to have an RSC must provide to TSA the names, title, phone number(s... any of this information changes. (e) Each freight railroad carrier, rail hazardous materials shipper...
New Hampshire state rail plan 2001
DOT National Transportation Integrated Search
2001-04-01
This report is the 2001 update to the New Hampshire Statewide Rail Plan, which was last updated in 1991 and amended in 1993. The Rail Plan presents an overview of the current status of the New Hampshire Rail System, who operates it and how it is util...
Natal plumage characters in rails
Wetherbee, D.K.; Meanley, B.
1965-01-01
The downy young of the Clapper Rail (Rallus longirostris), King Rail (Rallus elegans), and Virginia Rail (Rallus limicola) are described as totally black in all literature examined by us. Wetherbee (Bird-Banding, 32: 141-159, 1961) noted that some neonates of Virginia Rail from Storrs, Connecticut, had patches of white down below the wings. "Neonatal" pertains to the developmental condition or characters at hatching distinct from the much abused term "natal" which in ornithology pertains to the condition or characters from hatching to acquisition of teleoptile plumage. The presence of similar patches of white down was observed by us in the Clapper Rails at Chincoteague, Virginia (Figure 1). An examination of many hundreds of specimens from the ranges of most of the subspecies of Clapper Rails, including the strongly contrasting R. longirostris saturatus from Louisiana, revealed the almost invariable presence of at least 1 and sometimes as many as 30 white neossoptiles in the anterior abdominal regions of the ventral pterylae. Conversely, no King Rail neonate examined by us has shown a white neossoptile.
Interaction of railway vehicles with track in cross-winds
NASA Astrophysics Data System (ADS)
Xu, Y. L.; Ding, Q. S.
2006-04-01
This paper presents a framework for simulating railway vehicle and track interaction in cross-wind. Each 4-axle vehicle in a train is modeled by a 27-degree-of-freedom dynamic system. Two parallel rails of a track are modeled as two continuous beams supported by a discrete-elastic foundation of three layers with sleepers and ballasts included. The vehicle subsystem and the track subsystem are coupled through contacts between wheels and rails based on contact theory. Vertical and lateral rail irregularities simulated using an inverse Fourier transform are also taken into consideration. The simulation of steady and unsteady aerodynamic forces on a moving railway vehicle in cross-wind is then discussed in the time domain. The Hilber Hughes Taylor α-method is employed to solve the nonlinear equations of motion of coupled vehicle and track systems in cross-wind. The proposed framework is finally applied to a railway vehicle running on a straight track substructure in cross-wind. The safety and comfort performance of the moving vehicle in cross-wind are discussed. The results demonstrate that the proposed framework and the associated computer program can be used to investigate interaction problems of railway vehicles with track in cross-wind.
1985-05-08
Displacement Time Series Forecasts for Channels 2 Through 8 and (b) Channels 9 Through 16 33 17. Sample PSD Plots for ( a ) Levels 99 and 119 East Cell Rail...for Sensors at ( a ) Levels 99 and 119 on the West Cell Rail, (b) Level 69 on the East and West Cell Rail Footings, and (c) Level 99 on the West Cell Rail...17. Sample PSD Plots for ( a ) Levels 99 and 119 East Cell Rail Locations, (b) level 69 Sensors on the East and West Cell Rail Footings, and (c) Level
Control Measurements of Crane Rails Performed by Terrestrial Laser Scanning
Kregar, Klemen; Možina, Jan; Ambrožič, Tomaž; Kogoj, Dušan; Marjetič, Aleš; Štebe, Gašper; Savšek, Simona
2017-01-01
This article presents a method for measuring the geometry of crane rails with terrestrial laser scanning (TLS). Two sets of crane rails were divided into segments, their planes were adjusted, and the characteristic rail lines were defined. We used their profiles to define the positional and altitude deviations of the rails, the span and height difference between the two rails, and we also verified that they complied with the Eurocode 3 standard. We tested the method on crane rails at the hydroelectric power plant in Krško and the thermal power plant in Brestanica. We used two scanning techniques: “pure” TLS (Riegel VZ-400) and “hybrid” TLS (Leica MS50) scanning. This article’s original contribution lies in the detailed presentation of the computations used to define the characteristic lines of the rails without using the numeric procedures from existing software packages. We also analysed the influence of segment length and point density on the rail geometry results, and compared the two laser scanning techniques. We also compared the results obtained by terrestrial laser scanning with the results obtained from the classic polar method, which served as a reference point for its precision. PMID:28726755
NASA Technical Reports Server (NTRS)
Hochstadt, Jake
2011-01-01
Ruby on Rails is an open source web application framework for the Ruby programming language. The first application I built was a web application to manage and authenticate other applications. One of the main requirements for this application was a single sign-on service. This allowed authentication to be built in one location and be implemented in many different applications. For example, users would be able to login using their existing credentials, and be able to access other NASA applications without authenticating again. The second application I worked on was an internal qualification plan app. Previously, the viewing of employee qualifications was managed through Excel spread sheets. I built a database driven application to streamline the process of managing qualifications. Employees would be able to login securely to view, edit and update their personal qualifications.
75 FR 7426 - Periodic Reporting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-19
... change in transportation cost system sampling. The proposal involves distributing rail costs using inter...) sampling, and proposes instead to distribute rail costs using the Inter-BC highway distribution factors. \\1... rail sampling, and to use the TRACS inter-BMC distribtion in place of the Rail distribution key in Cost...
DOT National Transportation Integrated Search
2016-08-01
This project developed a solid-state welding process based on linear friction welding (LFW) technology. While resistance flash welding or : thermite techniques are tried and true methods for joining rails and performing partial rail replacement repai...
77 FR 37958 - Quarterly Rail Cost Adjustment Factor
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-25
..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the third quarter 2012 rail cost adjustment...
75 FR 35877 - Quarterly Rail Cost Adjustment Factor
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-23
... available on our Web site, http://www.stb.dot.gov . Copies of the decision may be purchased by contacting...-3)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the third quarter 2010 rail cost...
75 FR 58019 - Quarterly Rail Cost Adjustment Factor
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-23
..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the fourth quarter 2010 Rail Cost Adjustment...
75 FR 80895 - Quarterly Rail Cost Adjustment Factor
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-23
..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the first quarter 2011 Rail Cost Adjustment...
76 FR 16037 - Quarterly Rail Cost Adjustment Factor
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-22
..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the second quarter 2011 Rail Cost Adjustment...
78 FR 37660 - Quarterly Rail Cost Adjustment Factor
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-21
..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board approves the third quarter 2013 Rail Cost Adjustment Factor...
76 FR 37191 - Quarterly Rail Cost Adjustment Factor
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-24
... our Web site, http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the third quarter 2011 Rail Cost Adjustment...
78 FR 59093 - Quarterly Rail Cost Adjustment Factor
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-25
...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the fourth quarter 2013 rail cost adjustment factor (RCAF) and cost index filed by the Association of American Railroads. The fourth quarter 2013 RCAF...
78 FR 17764 - Quarterly Rail Cost Adjustment Factor
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the second quarter 2013 Rail Cost Adjustment...
Bridge rail and approach railing for low-volume roads in Iowa : tech transfer summary, March 2010.
DOT National Transportation Integrated Search
2010-03-01
The primary objective of the research summarized below was to describe the state of the practice regarding the nations bridge rails and approach guardrails and to perform a statewide crash analysis involving bridge rails and approach guardrails on...
Pulmonary embolism after long duration rail travel: economy class syndrome or rail coach syndrome.
Mittal, S K; Chopra, S; Calton, R
2011-07-01
Pulmonary embolism after long duration air travel is well described. However it can also occur following a long duration rail or road transport. We present a case of 43 year old male who developed deep venous thrombosis and acute pulmonary embolism after a long rail journey. We propose to call it as rail coach syndrome and stress the need for taking the same preventive measures as recommended for airline passengers.
Static stall alleviation using a rail plasma actuator
NASA Astrophysics Data System (ADS)
Choi, Young-Joon; Gray, Miles; Sirohi, Jayant; Raja, Laxminarayan L.
2018-07-01
An experimental study was conducted to investigate the ability of a rail plasma actuator (RailPAc) to alleviate static stall on an airfoil. The RailPAc device consists of parallel rails flush mounted on the upper surface of a VR-12 airfoil, with a high-current (∼1.3 kA) arc bridging the gap between the rails. A Lorentz force (∼0.3 N lasting ∼1 ms) generated on the arc propels it along the airfoil chord and transfers momentum to the surrounding flow. Experiments were conducted in a low speed wind tunnel at two different Reynolds numbers ( and ) and various static angles of attack (up to ∼30°). Particle image velocimetry (PIV) was used to measure the flow over the passive and actuated airfoil, while the airfoil lift was measured using a force balance. The experiments showed that the RailPAc promotes flow reattachment and can suppress static stall over a wide range of angles of attack. Operation of a single RailPAc resulted in ∼40 improvement in post-stall lift and ∼4° increase in stall angle compared to a passive airfoil with an unpowered RailPAc. The results provide insight into the actuation mechanism and demonstrate, for the first time, the ability of the RailPAc to alleviate static stall on an airfoil.
Modelling of dynamic contact length in rail grinding process
NASA Astrophysics Data System (ADS)
Zhi, Shaodan; Li, Jianyong; Zarembski, A. M.
2014-09-01
Rails endure frequent dynamic loads from the passing trains for supporting trains and guiding wheels. The accumulated stress concentrations will cause the plastic deformation of rail towards generating corrugations, contact fatigue cracks and also other defects, resulting in more dangerous status even the derailment risks. So the rail grinding technology has been invented with rotating grinding stones pressed on the rail with defects removal. Such rail grinding works are directed by experiences rather than scientifically guidance, lacking of flexible and scientific operating methods. With grinding control unit holding the grinding stones, the rail grinding process has the characteristics not only the surface grinding but also the running railway vehicles. First of all, it's important to analyze the contact length between the grinding stone and the rail, because the contact length is a critical parameter to measure the grinding capabilities of stones. Moreover, it's needed to build up models of railway vehicle unit bonded with the grinding stone to represent the rail grinding car. Therefore the theoretical model for contact length is developed based on the geometrical analysis. And the calculating models are improved considering the grinding car's dynamic behaviors during the grinding process. Eventually, results are obtained based on the models by taking both the operation parameters and the structure parameters into the calculation, which are suitable for revealing the process of rail grinding by combining the grinding mechanism and the railway vehicle systems.
A 3D Laser Profiling System for Rail Surface Defect Detection
Li, Qingquan; Mao, Qingzhou; Zou, Qin
2017-01-01
Rail surface defects such as the abrasion, scratch and peeling often cause damages to the train wheels and rail bearings. An efficient and accurate detection of rail defects is of vital importance for the safety of railway transportation. In the past few decades, automatic rail defect detection has been studied; however, most developed methods use optic-imaging techniques to collect the rail surface data and are still suffering from a high false recognition rate. In this paper, a novel 3D laser profiling system (3D-LPS) is proposed, which integrates a laser scanner, odometer, inertial measurement unit (IMU) and global position system (GPS) to capture the rail surface profile data. For automatic defect detection, first, the deviation between the measured profile and a standard rail model profile is computed for each laser-imaging profile, and the points with large deviations are marked as candidate defect points. Specifically, an adaptive iterative closest point (AICP) algorithm is proposed to register the point sets of the measured profile with the standard rail model profile, and the registration precision is improved to the sub-millimeter level. Second, all of the measured profiles are combined together to form the rail surface through a high-precision positioning process with the IMU, odometer and GPS data. Third, the candidate defect points are merged into candidate defect regions using the K-means clustering. At last, the candidate defect regions are classified by a decision tree classifier. Experimental results demonstrate the effectiveness of the proposed laser-profiling system in rail surface defect detection and classification. PMID:28777323
NASA Astrophysics Data System (ADS)
Sadeghi, Javad; Khajehdezfuly, Amin; Esmaeili, Morteza; Poorveis, Davood
2016-07-01
Rail irregularity is one of the most significant load amplification factors in railway track systems. In this paper, the capability and effectiveness of the two main railway slab tracks modeling techniques in prediction of the influences of rail irregularities on the Wheel/Rail Dynamic Force (WRDF) were investigated. For this purpose, two 2D and 3D numerical models of vehicle/discontinuous slab track interaction were developed. The validation of the numerical models was made by comparing the results of the models with those obtained from comprehensive field tests carried out in this research. The effects of the harmonic and non-harmonic rail irregularities on the WRDF obtained from 3D and 2D models were investigated. The results indicate that the difference between WRDF obtained from 2D and 3D models is negligible when the irregularities on the right and left rails are the same. However, as the difference between irregularities of the right and left rails increases, the results obtained from 2D and 3D models are considerably different. The results indicate that 2D models have limitations in prediction of WRDF; that is, a 3D modeling technique is required to predict WRDF when there is uneven or non-harmonic irregularity with large amplitudes. The size and extent of the influences of rail irregularities on the wheel/rail forces were discussed leading to provide a better understanding of the rail-wheel contact behavior and the required techniques for predicting WRDF.
76 FR 81011 - Notice of Final Federal Agency Actions on Proposed Light Rail Project in Washington
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-27
... on Proposed Light Rail Project in Washington AGENCY: Federal Highway Administration (FHWA... Light Rail Transit Project in King County Washington. These actions grant licenses, permits, and... Light Rail Transit Project, King County, WA. Federal Lead Agency: Federal Transit Administration (FTA...
DOT National Transportation Integrated Search
1976-05-01
This report presents an experimental design for a project to evaluate four techniques for reducing wheel-rail noise on urban rail transit systems: (a) resilient wheels, (b) damped wheels, (c) wheel truing, and (d) rail griding. The design presents th...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-07
... Rail and Public Transportation (DRPT) are co-lead State agencies. The Environmental Protection Agency... 27699-1553, or SEHSR Comments, Virginia Department of Rail and Public Transportation, 600 East Main... Ms. Christine Fix, Virginia Department of Rail & Public Transportation, 600 East Main Street, Suite...
78 FR 33393 - Petition Requesting a Ban or Standard on Adult Portable Bed Rails
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-04
... Standard on Adult Portable Bed Rails AGENCY: Consumer Product Safety Commission. ACTION: Notice. SUMMARY... adult portable bed rails pose an unreasonable risk of injury and initiate related rulemaking under... that adult portable bed rails pose an unreasonable risk of injury and initiate related rulemaking under...
Code of Federal Regulations, 2010 CFR
2010-10-01
... rails must be designed and constructed to withstand a point load of 91 kilograms (200 pounds) applied at... simultaneously. (c) Where space limitations make deck rails impractical for areas designed for crew use only...) high. (4) While engaged in big game angling, the minimum rail height may be reduced to not less than...
Code of Federal Regulations, 2012 CFR
2012-10-01
... rails must be designed and constructed to withstand a point load of 91 kilograms (200 pounds) applied at... simultaneously. (c) Where space limitations make deck rails impractical for areas designed for crew use only...) high. (4) While engaged in big game angling, the minimum rail height may be reduced to not less than...
Code of Federal Regulations, 2014 CFR
2014-10-01
... rails must be designed and constructed to withstand a point load of 91 kilograms (200 pounds) applied at... simultaneously. (c) Where space limitations make deck rails impractical for areas designed for crew use only...) high. (4) While engaged in big game angling, the minimum rail height may be reduced to not less than...
Code of Federal Regulations, 2011 CFR
2011-10-01
... rails must be designed and constructed to withstand a point load of 91 kilograms (200 pounds) applied at... simultaneously. (c) Where space limitations make deck rails impractical for areas designed for crew use only...) high. (4) While engaged in big game angling, the minimum rail height may be reduced to not less than...
Code of Federal Regulations, 2013 CFR
2013-10-01
... rails must be designed and constructed to withstand a point load of 91 kilograms (200 pounds) applied at... simultaneously. (c) Where space limitations make deck rails impractical for areas designed for crew use only...) high. (4) While engaged in big game angling, the minimum rail height may be reduced to not less than...
30 CFR 56.9102 - Movement of independently operating rail equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Movement of independently operating rail... MINES Loading, Hauling, and Dumping Traffic Safety § 56.9102 Movement of independently operating rail equipment. Movement of two or more pieces of rail equipment operating independently on the same track shall...
30 CFR 57.9102 - Movement of independently operating rail equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Movement of independently operating rail... NONMETAL MINES Loading, Hauling, and Dumping Traffic Safety § 57.9102 Movement of independently operating rail equipment. Movement of two or more pieces of rail equipment operating independently on the same...
Compared to truck transport, goods movement by rail produces generally lower air pollutant emissions (e.g., particulate matter, carbon dioxide) per ton of freight transported. Emissions associated with rail transport are also confined to rail corridors which may lower the risk of...
Evaluation of intrusion detection technologies for high speed rail grade crossings : final report.
DOT National Transportation Integrated Search
2003-12-01
The rail industry is in the process of developing a prototype system for high speed rail. One of the concerns when using high speed rail is the danger of obstructions on the track. This level of danger is much higher than with traditional railway veh...
29 CFR 1918.36 - Weather deck rails.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 7 2010-07-01 2010-07-01 false Weather deck rails. 1918.36 Section 1918.36 Labor... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING Working Surfaces § 1918.36 Weather deck rails. Removable weather deck rails shall be kept in place except when cargo operations require them to be removed...
29 CFR 1918.36 - Weather deck rails.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 7 2012-07-01 2012-07-01 false Weather deck rails. 1918.36 Section 1918.36 Labor... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING Working Surfaces § 1918.36 Weather deck rails. Removable weather deck rails shall be kept in place except when cargo operations require them to be removed...
29 CFR 1918.36 - Weather deck rails.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 7 2014-07-01 2014-07-01 false Weather deck rails. 1918.36 Section 1918.36 Labor... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING Working Surfaces § 1918.36 Weather deck rails. Removable weather deck rails shall be kept in place except when cargo operations require them to be removed...
29 CFR 1918.36 - Weather deck rails.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 7 2013-07-01 2013-07-01 false Weather deck rails. 1918.36 Section 1918.36 Labor... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING Working Surfaces § 1918.36 Weather deck rails. Removable weather deck rails shall be kept in place except when cargo operations require them to be removed...
29 CFR 1918.36 - Weather deck rails.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 7 2011-07-01 2011-07-01 false Weather deck rails. 1918.36 Section 1918.36 Labor... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING Working Surfaces § 1918.36 Weather deck rails. Removable weather deck rails shall be kept in place except when cargo operations require them to be removed...
76 FR 80448 - Quarterly Rail Cost Adjustment Factor
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-23
...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the first quarter 2012 rail cost adjustment factor (RCAF... decision, which is available on our Web site, http://www.stb.dot.gov . Copies of the decision may be...
77 FR 58910 - Quarterly Rail Cost Adjustment Factor
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-24
..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the fourth quarter 2012 rail cost adjustment factor (RCAF...
Code of Federal Regulations, 2010 CFR
2010-10-01
... rail cars, transport vehicles, freight containers, and bulk packages. 174.82 Section 174.82... Placarded Rail Cars, Transport Vehicles and Freight Containers § 174.82 General requirements for the handling of placarded rail cars, transport vehicles, freight containers, and bulk packages. (a) Unless...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Storm rails. 116.920 Section 116.920 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... and Guards § 116.920 Storm rails. Suitable storm rails or hand grabs must be installed where necessary...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Storm rails. 116.920 Section 116.920 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... and Guards § 116.920 Storm rails. Suitable storm rails or hand grabs must be installed where necessary...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Storm rails. 116.920 Section 116.920 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... and Guards § 116.920 Storm rails. Suitable storm rails or hand grabs must be installed where necessary...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Storm rails. 116.920 Section 116.920 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... and Guards § 116.920 Storm rails. Suitable storm rails or hand grabs must be installed where necessary...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Storm rails. 116.920 Section 116.920 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... and Guards § 116.920 Storm rails. Suitable storm rails or hand grabs must be installed where necessary...
49 CFR 212.233 - Apprentice highway-rail grade crossing inspector.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Apprentice highway-rail grade crossing inspector... Inspection Personnel § 212.233 Apprentice highway-rail grade crossing inspector. (a) An apprentice highway... Administrator for Safety leading to qualification as a highway-rail grade crossing inspector. The apprentice...
49 CFR 392.12 - Highway-rail crossings; safe clearance.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 5 2013-10-01 2013-10-01 false Highway-rail crossings; safe clearance. 392.12... DRIVING OF COMMERCIAL MOTOR VEHICLES Driving of Commercial Motor Vehicles § 392.12 Highway-rail crossings; safe clearance. No driver of a commercial motor vehicle shall drive onto a highway-rail grade crossing...
49 CFR 212.233 - Apprentice highway-rail grade crossing inspector.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Apprentice highway-rail grade crossing inspector... Inspection Personnel § 212.233 Apprentice highway-rail grade crossing inspector. (a) An apprentice highway... Administrator for Safety leading to qualification as a highway-rail grade crossing inspector. The apprentice...
49 CFR 392.12 - Highway-rail crossings; safe clearance.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 5 2014-10-01 2014-10-01 false Highway-rail crossings; safe clearance. 392.12... DRIVING OF COMMERCIAL MOTOR VEHICLES Driving of Commercial Motor Vehicles § 392.12 Highway-rail crossings; safe clearance. No driver of a commercial motor vehicle shall drive onto a highway-rail grade crossing...
49 CFR 212.233 - Apprentice highway-rail grade crossing inspector.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Apprentice highway-rail grade crossing inspector... Inspection Personnel § 212.233 Apprentice highway-rail grade crossing inspector. (a) An apprentice highway... Administrator for Safety leading to qualification as a highway-rail grade crossing inspector. The apprentice...
49 CFR 212.233 - Apprentice highway-rail grade crossing inspector.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Apprentice highway-rail grade crossing inspector... Inspection Personnel § 212.233 Apprentice highway-rail grade crossing inspector. (a) An apprentice highway... Administrator for Safety leading to qualification as a highway-rail grade crossing inspector. The apprentice...
49 CFR 212.233 - Apprentice highway-rail grade crossing inspector.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Apprentice highway-rail grade crossing inspector... Inspection Personnel § 212.233 Apprentice highway-rail grade crossing inspector. (a) An apprentice highway... Administrator for Safety leading to qualification as a highway-rail grade crossing inspector. The apprentice...
DOT National Transportation Integrated Search
1973-06-30
The development of experimental facilities for rail vehicle testing at the DOT High Speed Ground Test Center is being complemented by analytical studies. The purpose of this effort has been to gain insight into the dynamics of rail vehicles to guide ...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-19
...-Speed Rail Authority--Construction Exemption--in Merced, Madera and Fresno Counties, Cal AGENCY: Surface...-Speed Rail Authority (Authority) to construct an approximately 65- mile high-speed passenger rail line... statewide California High-Speed Train System. This exemption is subject to environmental mitigation...
77 FR 69769 - Solid Waste Rail Transfer Facilities
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-21
.... SUMMARY: These final rules govern land-use-exemption permits for solid waste rail transfer facilities. The... ``land-use-exemption permits'' in certain circumstances. Under the CRA, a solid waste rail transfer... grants a land-use-exemption permit for a solid waste rail transfer facility, such permit would only...
McKeown, Mark H.; Beason, Steven C.
1991-01-01
The radial arm strike rail assembly is a system for measurement of bearings, directions, and stereophotography for geologic mapping, particularly where magnetic compasses are not appropriate. The radial arm, pivoting around a shaft axis, provides a reference direction determination for geologic mapping and bearing or direction determination. The centerable and levelable pedestal provide a base for the radial arm strike rail and the telescoping camera pedestal. The telescoping feature of the radial arm strike rail allows positioning the end of the rail for strike direction or bearing measurement with a goniometer.
The Bosnian Train and Equip Program: A Lesson in Interagency Integration of Hard and Soft Power
2014-03-01
first week of January, 1996. In Zagreb , the Croatians were cautiously supportive on the condition that the program would be administered through the...and rail. That required support from Croatian officials in Zagreb to use the Croatian port of Ploce, which controlled the most efficient means of...the major impediment to passing the Defense Law and appealed to authorities in Zagreb to encourage their cooperation.199 Yet they also thought the
23 CFR 661.47 - Can bridge maintenance be performed with IRRBP funds?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Can bridge maintenance be performed with IRRBP funds... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.47 Can bridge maintenance be performed with IRRBP funds? No. Bridge maintenance repairs, e.g., guard rail repair, deck repairs, repair of...
23 CFR 661.47 - Can bridge maintenance be performed with IRRBP funds?
Code of Federal Regulations, 2010 CFR
2010-04-01
... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.47 Can bridge maintenance be performed with IRRBP funds? No. Bridge maintenance repairs, e.g., guard rail repair, deck repairs, repair of... 23 Highways 1 2010-04-01 2010-04-01 false Can bridge maintenance be performed with IRRBP funds...
7 CFR 1488.9 - Evidence of export.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 10 2010-01-01 2010-01-01 false Evidence of export. 1488.9 Section 1488.9 Agriculture... Export Sales of Agricultural Commodities From Private Stocks Under CCC Export Credit Sales Program (GSM-5) Documents Required for Financing § 1488.9 Evidence of export. (a) If the commodity is exported by rail or...
DOT National Transportation Integrated Search
2014-04-01
This independent report presents work conducted regarding project FR-RDD-0024-11-01 to advise and support the formulation of : regulations and supporting materials concerning critical incident response plans for rail carriers covered by the Rai...
75 FR 55394 - Program for Capital Grants for Rail Line Relocation and Improvement Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-10
... can be referenced at http://www.fws.gov/policy/library/rgeo12372.pdf . The names and addresses of the... Policy Requirements Appendix 2: Additional Information on Award Administrations and Grant Conditions... request a hard copy of the application package, please contact John Winkle, Office of Railroad Policy and...
Final Report-Rail Sensor Testbed Program: Active Agents in Containers for Transport Chain Security
2011-03-21
information. These trust approaches have been applied to a variety of regimes, including virtual communities [14], email [15] and ecommerce [16...2004(http://www .arxiv.org/abs/cond-mat/0402143). 16. Melnik, M., Aim, J., Does a seller’s eCommerce reputation matter? evidence from eBay auctions
DOT National Transportation Integrated Search
1996-10-01
By law, the Federal Railroad Administration (FRA) has responsibility for ensuring railroad safety throughout the nation. The United States railroad system consists of over 600 railroads with more than 250,000 employees, 200,000 miles of track, 1.2 mi...
NASA Technical Reports Server (NTRS)
Garcia, Sam; Homan, Jonathan; Speed, John
2016-01-01
NASA is the mission lead for the James Webb Space Telescope (JWST), the next of the "Great Observatories", scheduled for launch in 2018. It is directly responsible for the integration and test (I&T) program that will culminate in an end-to-end cryo vacuum optical test of the flight telescope and instrument module in Chamber A at NASA Johnson Space Center. Historic Chamber A is the largest thermal vacuum chamber at Johnson Space Center and one of the largest space simulation chambers in the world. Chamber A has undergone a major modernization effort to support the deep cryogenic, vacuum and cleanliness requirements for testing the JWST. This paper describe the challenges of developing, integrating and modifying new payload rails capable of transporting payloads within the thermal vacuum chamber up to 65,000 pounds. Ambient and Cryogenic Operations required to configure for testing will be explained. Lastly review historical payload configurations stretching from the Apollo program era to current James Webb Space Telescope testing.
Use of a genetic algorithm to improve the rail profile on Stockholm underground
NASA Astrophysics Data System (ADS)
Persson, Ingemar; Nilsson, Rickard; Bik, Ulf; Lundgren, Magnus; Iwnicki, Simon
2010-12-01
In this paper, a genetic algorithm optimisation method has been used to develop an improved rail profile for Stockholm underground. An inverted penalty index based on a number of key performance parameters was generated as a fitness function and vehicle dynamics simulations were carried out with the multibody simulation package Gensys. The effectiveness of each profile produced by the genetic algorithm was assessed using the roulette wheel method. The method has been applied to the rail profile on the Stockholm underground, where problems with rolling contact fatigue on wheels and rails are currently managed by grinding. From a starting point of the original BV50 and the UIC60 rail profiles, an optimised rail profile with some shoulder relief has been produced. The optimised profile seems similar to measured rail profiles on the Stockholm underground network and although initial grinding is required, maintenance of the profile will probably not require further grinding.
DOE Office of Scientific and Technical Information (OSTI.GOV)
DOE
2005-12-01
The purpose for agency action is to preclude surface entry and the location of new mining claims, subject to valid existing rights, within and surrounding the Caliente rail corridor as described in the Yucca Mountain FEIS (DOE 2002). This protective measure is needed to enhance the safe, efficient, and uninterrupted evaluation of land areas for potential rail alignments within the Caliente rail corridor. The evaluation will assist the DOE in determining, through the Rail Alignment environmental impact statement (EIS) process, whether to construct a branch rail line, and to provide support to the BLM in deciding whether or not tomore » reserve a ROW for the rail line under the Federal Land Policy and Management Act (FLPMA). The BLM participated as a cooperating agency in preparing this EA because it is the responsible land manager and BLM staff could contribute resource specific expertise.« less
Kurosawa, Kanji; Koga, Bunichiro; Ito, Hideki; Kiriyama, Shigeru; Higuchi, Shizuo
2003-05-20
A transport system includes a traveling rail (1) which constitutes a transport route and a transport body (3) which is capable of traveling on the traveling rail in the longitudinal direction of the traveling rail. Flexible drive tubes (5) are arranged on the traveling rail in the longitudinal direction of the traveling rail. The transport body includes a traveling wheel (4) which is capable of rolling on the traveling rail and drive wheels (2) which are capable of rolling on the drive tubes upon receiving the rotational drive power generated by pressure of a pressure medium supplied to the drive tubes while depressing the drive tubes. The traveling rail includes a plurality of transport sections and the transport body is capable of receiving a rotational drive force from the drive tubes at every transport sections. If necessary, a transport route changeover switch which changes over the transport route can be provided between the transport sections.
DOT National Transportation Integrated Search
1982-12-01
This report presents the results of an assessment of the benefits and costs associated with the adoption of Recommended Fire Safety Practices for Rail Transit Materials Selection for rapid rail transit and light rail transit vehicles. The potential b...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-02
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-11-000] Rail Splitter Wind Farm, LLC v. Ameren Services Company Midwest Independent Transmission, System Operator, Inc...) Rules of Practice and Procedures, 18 CFR 385.206, Rail Splitter Wind Farm, LLC (Rail Splitter or...
Code of Federal Regulations, 2011 CFR
2011-07-01
... sectional area of the side rail. The dimensions of side rails for their total length shall be those...). (b) Construction of portable wood cleated ladders up to 30 feet in length. (1) Wood side rails shall... than one such pocket appears in each 4 feet of length. (5) The width between side rails at the base...
This presentation will providing a summary of field measurements conducted in areas surrounding two major rail yards as well as modeling simulations of rail yard emissions dispersion. The Cicero Rail Yard Study (CIRYS) was recently released to the public and includes mobile and ...
49 CFR 213.122 - Torch cut rail.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Torch cut rail. 213.122 Section 213.122..., DEPARTMENT OF TRANSPORTATION TRACK SAFETY STANDARDS Track Structure § 213.122 Torch cut rail. (a) Except as a temporary repair in emergency situations no rail having a torch cut end shall be used in Classes 3 through 5...
Plans for crash-tested wood bridge railings for concrete decks
Michael A. Ritter; Ronald K. Faller; Barry T. Rosson; Paula D. Hilbrich Lee; Sheila Rimal Duwadi
1998-01-01
As part of a continuing cooperative research between the Midwest Roadside Safety Facility (MwRSF); the USDA Forest Service, Forest Products Laboratory (FPL); and the Federal Highway Administration (FHWA), several crashworthy wood bridge railings and approach railing transitions have been adapted for use on concrete bridge decks. These railings meet testing and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-13
... carriers, including each carrier operating light rail or heavy rail transit service on track that is part of the general railroad system of transportation and rail transit systems. Also, these persons are... any threat information. In addition, freight railroad carriers and the affected shippers and receivers...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-02
... receivers of certain hazardous materials; and passenger railroad carriers, including each carrier operating light rail or heavy rail transit service on track that is part of the general railroad system of transportation and rail transit systems. Also, these persons are required to report significant security concerns...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-27
... Railway Company--Operation Exemption--North Central Iowa Rail Corridor, LLC Iowa Northern Railway Company...) Docket No. FD 35507, North Central Iowa Rail Corridor, LLC--Acquisition Exemption--Union Pacific Railroad Company, in which North Central Iowa Rail Corridor, LLC seeks to acquire from Union Pacific Railroad...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-08
... Proposed Implementation of Rail Passenger Service on the Cotton Belt Corridor AGENCY: Federal Transit... service on the 26-mile long Cotton Belt Corridor from Dallas-Fort Worth International Airport (DFWIA) in... primary purpose of the Cotton Belt Corridor Regional Rail Project is to provide passenger rail connections...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
... FR 10087) announcing the CSX Transportation Railroad's (CSXT) request for a waiver to operate RailRunner equipment in RailRunner only operations; operate RailRunner equipment commingled with RoadRailer bi-modal equipment; and RailRunner equipment operating behind various conventional railcars. On...
49 CFR 213.122 - Torch cut rail.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Torch cut rail. 213.122 Section 213.122..., DEPARTMENT OF TRANSPORTATION TRACK SAFETY STANDARDS Track Structure § 213.122 Torch cut rail. (a) Except as a temporary repair in emergency situations no rail having a torch cut end shall be used in Classes 3 through 5...
49 CFR 214.521 - Flagging equipment for on-track roadway maintenance machines and hi-rail vehicles.
Code of Federal Regulations, 2010 CFR
2010-10-01
... maintenance machines and hi-rail vehicles. 214.521 Section 214.521 Transportation Other Regulations Relating... WORKPLACE SAFETY On-Track Roadway Maintenance Machines and Hi-Rail Vehicles § 214.521 Flagging equipment for on-track roadway maintenance machines and hi-rail vehicles. Each on-track roadway maintenance machine...
49 CFR 234.11 - State highway-rail grade crossing action plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false State highway-rail grade crossing action plans... PLANS Reports and Plans § 234.11 State highway-rail grade crossing action plans. (a) Purpose. The purpose of this section is to reduce collisions at highway-rail grade crossings in the ten States that...