Science.gov

Sample records for railroad facility operations

  1. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Railroad facilities. 1917.17 Section 1917.17 Labor... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.17 Railroad facilities. (a) Work shall be... movement. (m) Recessed railroad switches shall be enclosed to provide a level surface. (n) Warning...

  2. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Railroad facilities. 1917.17 Section 1917.17 Labor... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.17 Railroad facilities. (a) Work shall be... movement. (m) Recessed railroad switches shall be enclosed to provide a level surface. (n) Warning...

  3. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 7 2012-07-01 2012-07-01 false Railroad facilities. 1917.17 Section 1917.17 Labor... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.17 Railroad facilities. (a) Work shall be... movement. (m) Recessed railroad switches shall be enclosed to provide a level surface. (n) Warning...

  4. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Railroad facilities. 1917.17 Section 1917.17 Labor... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.17 Railroad facilities. (a) Work shall be... movement. (m) Recessed railroad switches shall be enclosed to provide a level surface. (n) Warning...

  5. 77 FR 75701 - Landisville Railroad, LLC-Operation Exemption-Buckeye East Chicago Railroad LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... Surface Transportation Board Landisville Railroad, LLC--Operation Exemption--Buckeye East Chicago Railroad LLC Landisville Railroad, LLC (Landisville), a Class III rail carrier, has filed a verified notice of... railroad right-of-way, and bulk liquid transloading facilities owned by Buckeye East Chicago Railroad,...

  6. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... railroad transportation. 202.7 Section 202.7 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD RETIREMENT ACT EMPLOYERS UNDER THE ACT § 202.7 Service or operation in connection with railroad transportation. The service rendered or the operation of equipment or facilities...

  7. 76 FR 50326 - Tyburn Railroad, LLC-Acquisition and Operation Exemption-Tyburn Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... Surface Transportation Board Tyburn Railroad, LLC--Acquisition and Operation Exemption--Tyburn Railroad Company Tyburn Railroad, LLC (Tyburn), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Tyburn Railroad Company and operate approximately 0.9 miles of rail lines...

  8. Control of railroad operations: Algorithms and economics

    SciTech Connect

    Harker, P.

    1994-12-31

    This paper presents the results of a seven-year research effort to apply optimization models and techniques to improve productivity and reliability of freight railroad operations. After describing the basic modelling framework, a series of optimization models will be described in detail along with the results of their application. The paper ends with a discussion of the future research opportunities in this area.

  9. 77 FR 34125 - Indexing the Annual Operating Revenues of Railroads

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... used by the railroads to adjust their gross annual operating revenues for classification purposes. This indexing methodology insures that railroads are classified based on real business expansion and not...

  10. 78 FR 21007 - Indexing the Annual Operating Revenues of Railroads

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-08

    ... TRANSPORTATION Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... used by the railroads to adjust their gross annual operating revenues for classification purposes. This indexing methodology insures that railroads are classified based on real business expansion and not...

  11. 75 FR 57553 - Indexing the Annual Operating Revenues of Railroads

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-21

    ... Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... used by the railroads to adjust their gross annual operating revenues for classification purposes. This indexing methodology insures that railroads are classified based on real business expansion and not...

  12. 76 FR 52384 - Indexing the Annual Operating Revenues of Railroads

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... used by the railroads to adjust their gross annual operating revenues for classification purposes. This indexing methodology insures that railroads are classified based on real business expansion and not...

  13. 75 FR 66421 - HC Railroad, LLC-Acquisition and Operation Exemption-Honey Creek Railroad, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF TRANSPORTATION Surface Transportation Board HC Railroad, LLC--Acquisition and Operation Exemption--Honey Creek... 1150.31 to acquire from the Honey Creek Railroad (HCR), and to operate 6.4 miles of HCR's rail...

  14. 77 FR 50762 - Arkansas-Oklahoma Railroad, Inc.-Lease and Operation Exemption-Line of Union Pacific Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ... Surface Transportation Board Arkansas-Oklahoma Railroad, Inc.--Lease and Operation Exemption-- Line of Union Pacific Railroad Company Arkansas-Oklahoma Railroad, Inc. (AOK), a Class III rail carrier, has filed a verified notice of exemption under 49 CFR 1150.41 to lease from Union Pacific Railroad...

  15. 75 FR 18254 - R.J. Corman Railroad Company/Bardstown Line-Lease and Operation Exemption-R.J. Corman Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... Surface Transportation Board R.J. Corman Railroad Company/Bardstown Line--Lease and Operation Exemption--R.J. Corman Railroad Property, LLC R.J. Corman Railroad Company/Bardstown Line (RJC Railroad Company... from R.J. Corman Railroad Property, LLC (RJC Railroad Property), and to operate approximately 42...

  16. 20. SOUTH PLANT NORTHCENTER RAILROAD SPUR, WITH FACILITIES MAINTENANCE BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. SOUTH PLANT NORTH-CENTER RAILROAD SPUR, WITH FACILITIES MAINTENANCE BUILDING (BUILDING 543) AT LEFT AND WHITE PHOSPHOROUS FILLING BUILDING (BUILDING 541) AT CENTER. VIEW TO WEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  17. 76 FR 28850 - Northern Plains Railroad, Inc.-Intra-Corporate Family Operation Exemption-Mohall Central Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Northern Plains Railroad, Inc.--Intra-Corporate Family Operation Exemption--Mohall Central Railroad, Inc. Northern Plains Railroad, Inc. (NPR), a Class III rail common carrier, has filed a verified notice of...

  18. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... meaning given these terms in 49 CFR Part 1201. ... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and...

  19. 77 FR 27857 - Columbus & Chattahoochee Railroad, Inc.-Lease and Operation Exemption-Norfolk Southern Railway...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... Surface Transportation Board Columbus & Chattahoochee Railroad, Inc.--Lease and Operation Exemption--Norfolk Southern Railway Company Columbus & Chattahoochee Railroad, Inc. (CCR), a noncarrier, has filed a... in Control Exemption-- Columbus & Chattahoochee Railroad, Inc., Docket No. FD 35621, in which...

  20. 75 FR 6790 - Nebraska Northwestern Railroad, Inc.-Acquisition and Operation Exemption-Dakota, Minnesota...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ...--Dakota, Minnesota & Eastern Railroad Corporation Nebraska Northwestern Railroad, Inc. (NNW), a noncarrier... Dakota, Minnesota & Eastern Railroad Corporation (DM&E) and to operate approximately 28.1 miles of...

  1. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... meaning given these terms in 49 CFR Part 1201. ... 49 Transportation 4 2014-10-01 2014-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and...

  2. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... meaning given these terms in 49 CFR Part 1201. ... 49 Transportation 4 2012-10-01 2012-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and...

  3. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... meaning given these terms in 49 CFR Part 1201. ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and...

  4. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... meaning given these terms in 49 CFR Part 1201. ... 49 Transportation 4 2013-10-01 2013-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and...

  5. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... regulations and railroad operating rules. 220.43 Section 220.43 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS... regulations and railroad operating rules. Radio communication shall not be used in connection with a...

  6. The Nevada railroad system: Physical, operational, and accident characteristics

    SciTech Connect

    1991-09-01

    This report provides a description of the operational and physical characteristics of the Nevada railroad system. To understand the dynamics of the rail system, one must consider the system`s physical characteristics, routing, uses, interactions with other systems, and unique operational characteristics, if any. This report is presented in two parts. The first part is a narrative description of all mainlines and major branchlines of the Nevada railroad system. Each Nevada rail route is described, including the route`s physical characteristics, traffic type and volume, track conditions, and history. The second part of this study provides a more detailed analysis of Nevada railroad accident characteristics than was presented in the Preliminary Nevada Transportation Accident Characterization Study (DOE, 1990).

  7. 76 FR 68523 - Utah Southern Railroad Company, LLC-Change in Operators Exemption-Iron Bull Railroad Company, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... Surface Transportation Board Utah Southern Railroad Company, LLC--Change in Operators Exemption--Iron Bull... of exemption under 49 CFR 1150.31 to change operators from Iron Bull Railroad Company (IBRC) to USRC... near Iron Springs, Utah, and milepost 14.7 at or near Iron Mountain, Utah, a distance of 14.6 miles...

  8. 76 FR 5649 - Tongue River Railroad Company, Inc.-Construction and Operation-Western Alignment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Tongue River Railroad Company, Inc.--Construction and Operation-- Western... Tongue River Railroad Company's (TRRC) application to construct and operate a rail line in...

  9. 76 FR 21425 - Rocky Mountain Railcar and Repair, Inc.-Acquisition and Operation Exemption-Line of Railroad in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-15

    ... Surface Transportation Board Rocky Mountain Railcar and Repair, Inc.--Acquisition and Operation Exemption--Line of Railroad in Tooele County, UT Rocky Mountain Railcar and Repair, Inc. (Rocky Mountain), a... line. \\1\\ Rocky Mountain states that it currently operates a railcar repair facility, but that it...

  10. Mutual design: Overhead transmission lines and railroad facilities: Susceptibility program: Final report

    SciTech Connect

    Frazier, M.J.; Little, D.R.

    1989-07-01

    The sharing of common corridors by electric power transmission lines and railroad facilities can result in the coupling of unwanted electromagnetic energy from the power lines into nearby railroad systems. The coupling can result in voltage being induced onto the railroad system conductors that may compromise the inherent safety and reliability of the railroad signalling system. This broad-scoped research program, which is co-sponsored by EPRI and the AAR, is addressing the problem from two directions. This two volume report describes a Phase 1 effort to develop the methods and techniques for quantifying the signal system response to interference. 54 figs., 7 tabs.

  11. 75 FR 68398 - Texas, Oklahoma & Eastern Railroad, LLC-Acquisition and Operation Exemption-Texas, Oklahoma...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... Surface Transportation Board Texas, Oklahoma & Eastern Railroad, LLC--Acquisition and Operation Exemption--Texas, Oklahoma & Eastern Railroad Company Texas, Oklahoma & Eastern Railroad, LLC (TOE), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Texas,...

  12. 77 FR 19417 - Affton Terminal Railroad Company-Operation Exemption1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ... TRANSPORTATION Surface Transportation Board Affton Terminal Railroad Company--Operation Exemption\\1\\--Affton Trucking Company Affton Terminal Railroad Company (ATRR), a noncarrier, has filed a verified notice of... related products with the Terminal Railroad Association of St. Louis and BNSF Railway Company and...

  13. 77 FR 27857 - Kingman Terminal Railroad, LLC-Operation Exemption-Kingman Airport Authority, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... Surface Transportation Board Kingman Terminal Railroad, LLC--Operation Exemption--Kingman Airport Authority, Inc. Kingman Terminal Railroad, LLC (KTRR), a noncarrier, has filed a verified notice of....--Continuance in Control Exemption--Kingman Terminal Railroad, LLC, Docket No. FD 35619, wherein...

  14. 76 FR 39156 - R. J. Corman Railroad Company/Bardstown Line-Lease and Operation Exemption-R. J. Corman Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... Register on April 9, 2010 (75 FR 18,254), and became effective on April 25, 2010. On May 28, 2010, RJC... Surface Transportation Board R. J. Corman Railroad Company/Bardstown Line--Lease and Operation Exemption--R. J. Corman Railroad Property, LLC R. J. Corman Railroad Company/Bardstown Line (RJC...

  15. 75 FR 7152 - Stillwater Central Railroad, Inc.-Lease and Operation Exemption-Hollis & Eastern Railroad L.L.C.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Stillwater Central Railroad, Inc.--Lease and Operation Exemption--Hollis... verified notice of exemption under 49 CFR 1150.41 to lease and to operate, pursuant to a lease...

  16. 76 FR 27173 - Carolina Coastal Railway, Inc.-Acquisition and Operation Exemption-Rocky Mount & Western Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... Surface Transportation Board Carolina Coastal Railway, Inc.--Acquisition and Operation Exemption--Rocky Mount & Western Railroad Co., Inc. d/b/a Nash County Railroad Carolina Coastal Railway, Inc. (CLNA), a... Rocky Mount & Western Railroad Co., Inc. d/b/a Nash County Railroad (NCR), and to operate,...

  17. 77 FR 38884 - Wyoming Connect Railroad LLC-Acquisition and Operation Exemption-Union Pacific Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Surface Transportation Board Wyoming Connect Railroad LLC--Acquisition and Operation Exemption--Union... the Surface Transportation Board, 395 E Street SW., Washington, DC 20423-0001. In addition, a copy of... 60604. Board decisions and notices are available on our Web site at www.stb.dot.gov . Decided: June...

  18. 75 FR 68397 - DeQueen and Eastern Railroad, LLC-Acquisition and Operation Exemption-DeQueen and Eastern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... Surface Transportation Board DeQueen and Eastern Railroad, LLC--Acquisition and Operation Exemption--DeQueen and Eastern Railroad Company DeQueen and Eastern Railroad, LLC (DQE), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from DeQueen and Eastern Railroad Company...

  19. 77 FR 74548 - North Shore Railroad Company-Acquisition and Operation Exemption-PPL Susquehanna, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ...., FD 35576 (STB served Dec. 7, 2011); 76 FR 76490. On July 2, 2012, North Shore filed a revised copy of... Surface Transportation Board North Shore Railroad Company--Acquisition and Operation Exemption--PPL Susquehanna, LLC North Shore Railroad Company (North Shore), a Class III rail carrier, has filed a...

  20. 76 FR 22449 - Sierra Northern Railway-Acquisition and Operation Exemption-Union Pacific Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-21

    ... Santa Cruz County Regional Transportation Commission (SCCRTC), a freight operating easement over a portion of a line of railroad known as the Santa Cruz Branch located between milepost 0.433, at the east...., including the interconnection with the Santa Cruz and Big Trees Railroad at milepost 20.4, at Santa...

  1. 75 FR 82426 - Big Four Terminal Railroad, LLC-Operation Exemption-RMW Ventures, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Big Four Terminal Railroad, LLC--Operation Exemption--RMW Ventures, LLC Big Four Terminal Railroad, LLC (BFTR), has filed a verified notice of exemption under 49 CFR 1150.31...

  2. 76 FR 77890 - Swan Ranch Railroad, L.L.C.-Operation Exemption-Swan Industrial Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-14

    ... Surface Transportation Board Swan Ranch Railroad, L.L.C.--Operation Exemption--Swan Industrial Park Swan Ranch Railroad, L.L.C. (SRR),\\1\\ a noncarrier, has filed a verified notice of exemption under 49 CFR..., L.L.C., wherein Watco seeks Board approval to continue in control of SRR, upon SRR's becoming...

  3. 76 FR 22746 - Wiregrass Central Railway, LLC-Acquisition and Operation Exemption-Wiregrass Central Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... Surface Transportation Board Wiregrass Central Railway, LLC--Acquisition and Operation Exemption--Wiregrass Central Railroad Company, Inc. Wiregrass Central Railway, LLC (WCR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Wiregrass Central Railroad Company,...

  4. 21 CFR 1250.45 - Food handling facilities on railroad conveyances.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Food handling facilities on railroad conveyances. 1250.45 Section 1250.45 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS UNDER CERTAIN OTHER ACTS ADMINISTERED BY THE FOOD AND DRUG...

  5. 21 CFR 1250.45 - Food handling facilities on railroad conveyances.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Food handling facilities on railroad conveyances. 1250.45 Section 1250.45 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS UNDER CERTAIN OTHER ACTS ADMINISTERED BY THE FOOD AND DRUG...

  6. 21 CFR 1250.45 - Food handling facilities on railroad conveyances.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Food handling facilities on railroad conveyances. 1250.45 Section 1250.45 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS UNDER CERTAIN OTHER ACTS ADMINISTERED BY THE FOOD AND DRUG...

  7. 21 CFR 1250.45 - Food handling facilities on railroad conveyances.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Food handling facilities on railroad conveyances. 1250.45 Section 1250.45 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS UNDER CERTAIN OTHER ACTS ADMINISTERED BY THE FOOD AND DRUG...

  8. 21 CFR 1250.45 - Food handling facilities on railroad conveyances.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Food handling facilities on railroad conveyances. 1250.45 Section 1250.45 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS UNDER CERTAIN OTHER ACTS ADMINISTERED BY THE FOOD AND DRUG...

  9. Mutual design: Overhead Transmission Lines and Railroad Facilities Susceptibility Program, Phase 2: Volume 1, Railroad track interference-susceptibility tester design and testing; Volume 2, Set-up and LFETC test plan; Volume 3, Fabrication information. Final report

    SciTech Connect

    Frazier, M.J.; Little, D.R.

    1995-09-01

    The sharing of corridors by electric power-transmission lines and railroad facilities results in coupling of electromagnetic energy from the power lines into nearby railroad systems. This electromagnetic coupling can induce voltage levels onto the railroad signaling system that can adversely affect the operation of these systems. The development and rapid deployment of sophisticated solid-state electronic track-signaling systems and the continued increase in demand for power will make this problem more serious, as additional joint railroad/electricutility common corridors will be needed and as power-system upgrades for existing corridors will be initiated. This three-volume report describes the development of a laboratory railroad-track simulator/interference-susceptibility tester. This simulator permits track-circuit signaling and grade-crossing systems to be tested in the laboratory to determine their susceptibility to power-line interference that is coupled to the rails for a wide range of realistic normal and abnormal signal-system operating conditions, block-length arrangements, and interference conditions. The simulator provides an accurate electrical analogue of the track system, including frequency-dependent rail skin-effect impedance, signal attenuation, and controlled-ballast variation. The simulator can be used to investigate the effects of both longitudinal and differential interference excitation of the rails.

  10. 75 FR 45011 - Gardendale Railroad, Inc.-Operation Exemption-Rail Line of Border Transload & Transfer, Inc. at...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    .... (BTT) (formerly known as Texas Railroad Switching, Inc. (TRS)).\\1\\ \\1\\ In 1990, CCR received an exemption to acquire a 53.41-mile line of railroad and TRS received an exemption to lease and operate...

  11. 78 FR 28289 - Grand Trunk Western Railroad Company-Acquisition of Operating Easement-CSX Transportation, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-14

    ..., non-assignable railroad operating easement over: 1. The location of the railroad at-grade crossing, at... IC tracks, together with appurtenances (other than the CSXT tracks outside the crossing) and related interlocking (Leewood Crossing); and 2. The location of the railroad at-grade crossing, at or near...

  12. 78 FR 24465 - Ballard Terminal Railroad Company, L.L.C.-Acquisition and Operation Exemption-Woodinville...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ... Surface Transportation Board Ballard Terminal Railroad Company, L.L.C.--Acquisition and Operation...; request for comments. SUMMARY: On April 2, 2013, Ballard Terminal Railroad Company, L.L.C. (Ballard), a... the Line at issue here. Ballard Terminal Railroad Company, L.L.C.--Lease Exemption--Line of...

  13. 75 FR 63532 - Lancaster & Chester Railroad, LLC-Acquisition and Operation Exemption-Line of Lancaster & Chester...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... Surface Transportation Board Lancaster & Chester Railroad, LLC--Acquisition and Operation Exemption--Line of Lancaster & Chester Railway Company Lancaster & Chester Railroad, LLC (L&C Railroad), a noncarrier... miles of rail line owned by Class III rail carrier Lancaster & Chester Railway Company as follows:...

  14. 77 FR 14058 - Santa Teresa Southern Railroad, LLC-Operation Exemption-Rail Line of Verde Logistics Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ... Logistics Railroad, LLC at Santa Teresa, Dona Ana County, NM Santa Teresa Southern Railroad, LLC (STSR), a... feet of rail line owned by Verde Logistics Railroad, LLC (Verde). The rail line extends between a point... to shippers and receivers located in the Santa Teresa Logistics Industrial Park. \\1\\ STSR states...

  15. 76 FR 22745 - Three Notch Railway, LLC-Acquisition and Operation Exemption-Three Notch Railroad Co., Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... Surface Transportation Board Three Notch Railway, LLC--Acquisition and Operation Exemption-- Three Notch Railroad Co., Inc. Three Notch Railway, LLC (TNRW), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Three Notch Railroad Co., Inc. (TNHR) and to operate...

  16. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Radio communications consistent with federal... Radio and Wireless Communication Procedures § 220.43 Radio communications consistent with federal regulations and railroad operating rules. Radio communication shall not be used in connection with a...

  17. 78 FR 41994 - RSL Railroad LLC-Operation Exemption-Massillon Energy & Technology Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board RSL Railroad LLC--Operation Exemption--Massillon Energy & Technology Park On... milepost 1.27 (the Line), pursuant to an agreement with Massillon Energy & Technology Park (Massillon),...

  18. 78 FR 30965 - AG Valley Railroad, LLC-Operation Exemption-Ag Valley Holdings, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... Surface Transportation Board AG Valley Railroad, LLC--Operation Exemption--Ag Valley Holdings, LLC AG... original and 10 copies of all pleadings, referring to Docket No. FD 35736, must be filed with the Surface.... Board decisions and notices are available on our Web site at www.stb.dot.gov . Decided: May 20, 2013....

  19. 77 FR 10617 - Wellsboro & Corning Railroad, LLC-Acquisition and Operation Exemption-Wellsboro & Corning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... Surface Transportation Board Wellsboro & Corning Railroad, LLC--Acquisition and Operation Exemption... 10 copies of all pleadings, referring to Docket No. FD 35595, must be filed with the Surface... are available on our Web site at www.stb.dot.gov . Decided: February 13, 2012. ] By the Board,...

  20. 75 FR 59579 - Restrictions on Railroad Operating Employees' Use of Cellular Telephones and Other Electronic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... electronic devices by railroad operating employees. 75 FR 27672 (May 18, 2010). The NPRM proposed to codify many of the requirements of Emergency Order 26 (Order or EO 26, 73 FR 58702 (Oct. 7, 2008)), but... telephones and other electronic devices while on duty. (73 FR 58702, Oct. 7, 2008). This FRA action was...

  1. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Radio communications consistent with federal... Radio and Wireless Communication Procedures § 220.43 Radio communications consistent with federal regulations and railroad operating rules. Radio communication shall not be used in connection with a...

  2. 77 FR 38884 - Sisseton Milbank Railroad Company-Acquisition and Operation Exemption-SLA Property Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Sisseton Milbank Railroad Company--Acquisition and Operation Exemption--SLA... original and ten copies of all pleadings, referring to Docket No. FD 35641, must be filed with the...

  3. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Radio communications consistent with federal... Radio and Wireless Communication Procedures § 220.43 Radio communications consistent with federal regulations and railroad operating rules. Radio communication shall not be used in connection with a...

  4. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Radio communications consistent with federal... Radio and Wireless Communication Procedures § 220.43 Radio communications consistent with federal regulations and railroad operating rules. Radio communication shall not be used in connection with a...

  5. 76 FR 13446 - Nittany Bald and Eagle Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... Surface Transportation Board Nittany Bald and Eagle Railroad Company-Operation Exemption-SEDA- COG Joint Rail Authority Nittany Bald and Eagle Railroad Company (N&BE), a Class III carrier, has filed a... the Board in Susquehanna Union R.R.-Control Exemption- N. Shore R.R., Nittany & Bald Eagle...

  6. 76 FR 15047 - Port of Ivory, LLC-Operation Exemption-Line of Railroad in Tulare County, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... Surface Transportation Board Port of Ivory, LLC--Operation Exemption--Line of Railroad in Tulare County, CA Port of Ivory, LLC (Port), a limited liability company and noncarrier, has filed a verified notice... Valley Railroad Company (SJVR) at a point known as Ivory (milepost 232.3 on SJVR's Exeter...

  7. 76 FR 16654 - Austin Western Railroad, L.L.C.-Lease and Operation Exemption-Capital Metropolitan Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Austin Western Railroad, L.L.C.--Lease and Operation Exemption-- Capital Metropolitan Transportation Authority Austin Western Railroad, L.L.C. (AWRR), a Class III rail carrier,...

  8. 76 FR 42163 - East Penn Railroad, L.L.C.; Lease and Operation Exemption; Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board East Penn Railroad, L.L.C.; Lease and Operation Exemption; Norfolk Southern.... East Penn Railroad, L.L.C. (ESPN), a Class III rail carrier, has filed a verified notice of...

  9. 78 FR 338 - Buckeye Hammond Railroad, L.L.C.; Acquisition and Operation Exemption; Buckeye Partners, L.P.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-03

    ... Surface Transportation Board Buckeye Hammond Railroad, L.L.C.; Acquisition and Operation Exemption; Buckeye Partners, L.P. Buckeye Hammond Railroad, L.L.C. (BHRR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 \\1\\ to acquire from Buckeye Partners, L.P., a noncarrier, and...

  10. 77 FR 64592 - Tongue River Railroad Company, Inc.-Rail Construction and Operation-in Custer, Powder River and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ... TRANSPORTATION Surface Transportation Board Tongue River Railroad Company, Inc.--Rail Construction and Operation... on Draft Scope. SUMMARY: On October 16, 2012, Tongue River Railroad Company, Inc. (TRRC) filed a... Miles City, Montana, and two termini located near Ashland, Montana, a proceeding known as Tongue River...

  11. 76 FR 12224 - Autauga Northern Railroad, L.L.C.-Lease and Operation Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Surface Transportation Board Autauga Northern Railroad, L.L.C.--Lease and Operation Exemption--Norfolk Southern Railway Company Autauga Northern Railroad, L.L.C. (ANRR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire by lease from Norfolk Southern Railway Company...

  12. 75 FR 7537 - Elkhart & Western Railroad Co.-Lease and Operation Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... Surface Transportation Board Elkhart & Western Railroad Co.--Lease and Operation Exemption-- Norfolk Southern Railway Company Elkhart & Western Railroad Co. (EWR), a Class III rail carrier,\\1\\ has filed a... (Agreement) \\2\\ with Norfolk Southern Railway Company (NSR), approximately 23.0 miles of NSR's rail...

  13. 76 FR 75602 - Hilton & Albany Railroad, Inc.-Lease and Operation Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... TRANSPORTATION Surface Transportation Board Hilton & Albany Railroad, Inc.--Lease and Operation Exemption-- Norfolk Southern Railway Company Hilton & Albany Railroad, Inc. (HAL), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to lease from Norfolk Southern Railway Company (NSR) and...

  14. 76 FR 22746 - Conecuh Valley Railway, LLC-Acquisition and Operation Exemption-Conecuh Valley Railroad Co., Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... Surface Transportation Board Conecuh Valley Railway, LLC--Acquisition and Operation Exemption--Conecuh Valley Railroad Co., Inc. Conecuh Valley Railway, LLC (CVR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Conecuh Valley Railroad Co., Inc. (COEH), and to...

  15. 77 FR 55268 - Union Pacific Railroad Company-Acquisition and Operation Exemption-San Pedro Railroad Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ..., LLC's (SPROC) line segments between MP 1040.15 at Curtiss, Ariz., and MP 1041.32 near Curtiss (Parcel... property rights, including SPROC's freight operating easement, in a line segment between MP 1041.32 and...

  16. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the transportation of passengers or property by railroad, or the receipt, delivery, elevation... carrier by railroad, or to the receipt, delivery, elevation, transfer in transit, refrigeration or...

  17. Designing Facilities for Collaborative Operations

    NASA Technical Reports Server (NTRS)

    Norris, Jeffrey; Powell, Mark; Backes, Paul; Steinke, Robert; Tso, Kam; Wales, Roxana

    2003-01-01

    A methodology for designing operational facilities for collaboration by multiple experts has begun to take shape as an outgrowth of a project to design such facilities for scientific operations of the planned 2003 Mars Exploration Rover (MER) mission. The methodology could also be applicable to the design of military "situation rooms" and other facilities for terrestrial missions. It was recognized in this project that modern mission operations depend heavily upon the collaborative use of computers. It was further recognized that tests have shown that layout of a facility exerts a dramatic effect on the efficiency and endurance of the operations staff. The facility designs (for example, see figure) and the methodology developed during the project reflect this recognition. One element of the methodology is a metric, called effective capacity, that was created for use in evaluating proposed MER operational facilities and may also be useful for evaluating other collaboration spaces, including meeting rooms and military situation rooms. The effective capacity of a facility is defined as the number of people in the facility who can be meaningfully engaged in its operations. A person is considered to be meaningfully engaged if the person can (1) see, hear, and communicate with everyone else present; (2) see the material under discussion (typically data on a piece of paper, computer monitor, or projection screen); and (3) provide input to the product under development by the group. The effective capacity of a facility is less than the number of people that can physically fit in the facility. For example, a typical office that contains a desktop computer has an effective capacity of .4, while a small conference room that contains a projection screen has an effective capacity of around 10. Little or no benefit would be derived from allowing the number of persons in an operational facility to exceed its effective capacity: At best, the operations staff would be underutilized

  18. 76 FR 75600 - Port Rail Link, Inc.-Acquisition and Operation Exemption-Rail Lines of Union Pacific Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... Union Pacific Railroad Company and The Lake Charles Harbor and Terminal District Port Rail Link, Inc... Harbor and Terminal District (the District), operator ] of the Port of Lake Charles (the Port),...

  19. 77 FR 72907 - Western Washington Railroad, LLC-Lease and Operation Exemption-City of Tacoma, Department of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ...-- City of Tacoma, Department of Public Works On November 20, 2012, Western Washington Railroad, LLC (WWRR... CFR 1150.31 to lease from the City of Tacoma, Department of Public Works (Tacoma Rail) and operate...

  20. 78 FR 36017 - MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad-Operation Exemption-Hilco SP Rail, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... Railroad Holding, LLC, FD 35734 (STB served Apr. 26, 2013); 78 FR 24,803 (Apr. 26, 2013). MCM's notice was... Surface Transportation Board MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad-- Operation Exemption--Hilco SP Rail, LLC MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad (MCM), a...

  1. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad, if... carrier by railroad, or to the receipt, delivery, elevation, transfer in transit, refrigeration or...

  2. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad, if... carrier by railroad, or to the receipt, delivery, elevation, transfer in transit, refrigeration or...

  3. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad, if... carrier by railroad, or to the receipt, delivery, elevation, transfer in transit, refrigeration or...

  4. 75 FR 49549 - ABC & D Recycling, Inc.-Lease and Operation Exemption-a Line of Railroad in Ware, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... Surface Transportation Board ABC & D Recycling, Inc.--Lease and Operation Exemption--a Line of Railroad in Ware, MA ABC & D Recycling, Inc. (ABC & D), a noncarrier, has filed a verified notice of exemption... operation of this trackage in FD 35356, ABC & D Recycling, Inc.--Lease and Operation Exemption--a Line...

  5. Operating Costs of Educational Facilities.

    ERIC Educational Resources Information Center

    Isler, Norman P.

    The references included were drawn from the documents received and processed to date by the ERIC Clearinghouse on Educational Facilities, and are organized into the following sections--(1) school business, (2) maintenance and operations, (3) insurance programs, (4) property accounting, (5) purchasing, and (6) food service. (FS)

  6. 77 FR 69928 - Transco Railway Products Inc.-Acquisition and Operation Exemption-D&W Railroad LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-21

    ... Surface Transportation Board Transco Railway Products Inc.--Acquisition and Operation Exemption--D&W... exemption under 49 CFR 1150.31 to acquire from D&W Railroad LLC (D&W) and to operate approximately 23 miles...&W main line, which segments include three parallel tracks northeast of the Stub-ended...

  7. 78 FR 54955 - Mississippi Central Railroad Co.-Lease and Change in Operators Exemption-Line of Mississippi...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ...-mile line of railroad between milepost IC-529.5 (Corinth, Miss.) and milepost IC-571.0 (Red Bay, Ala... MSCI to lease and operate the Line between Corinth and Red Bay. MSCI states that RRC will also assign... 1995. See Redmont Ry.--Lease & Operation Exemption--Certain Lines of Miss.-Ala. R.R. Auth., FD...

  8. 78 FR 25784 - Keenesburg Direct Railroad, LLC-Acquisition and Operation Exemption-J D East, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Keenesburg Direct Railroad, LLC--Acquisition and Operation Exemption--J D... under 49 CFR 1150.31 to acquire from J D East, LLC (JDE), and to operate, approximately 0.16 miles...

  9. Facility design, construction, and operation

    SciTech Connect

    1995-04-01

    France has been disposing of low-level radioactive waste (LLW) at the Centre de Stockage de la Manche (CSM) since 1969 and now at the Centre de Stockage de l`Aube (CSA) since 1992. In France, several agencies and companies are involved in the development and implementation of LLW technology. The Commissariat a l`Energie Atomic (CEA), is responsible for research and development of new technologies. The Agence National pour la Gestion des Dechets Radioactifs is the agency responsible for the construction and operation of disposal facilities and for wastes acceptance for these facilities. Compagnie Generale des Matieres Nucleaires provides fuel services, including uranium enrichment, fuel fabrication, and fuel reprocessing, and is thus one generator of LLW. Societe pour les Techniques Nouvelles is an engineering company responsible for commercializing CEA waste management technology and for engineering and design support for the facilities. Numatec, Inc. is a US company representing these French companies and agencies in the US. In Task 1.1 of Numatec`s contract with Martin Marietta Energy Systems, Numatec provides details on the design, construction and operation of the LLW disposal facilities at CSM and CSA. Lessons learned from operation of CSM and incorporated into the design, construction and operating procedures at CSA are identified and discussed. The process used by the French for identification, selection, and evaluation of disposal technologies is provided. Specifically, the decisionmaking process resulting in the change in disposal facility design for the CSA versus the CSM is discussed. This report provides` all of the basic information in these areas and reflects actual experience to date.

  10. PROJECTIZING AN OPERATING NUCLEAR FACILITY

    SciTech Connect

    Adams, N

    2007-07-08

    This paper will discuss the evolution of an operations-based organization to a project-based organization to facilitate successful deactivation of a major nuclear facility. It will describe the plan used for scope definition, staff reorganization, method estimation, baseline schedule development, project management training, and results of this transformation. It is a story of leadership and teamwork, pride and success. Workers at the Savannah River Site's (SRS) F Canyon Complex (FCC) started with a challenge--take all the hazardous byproducts from nearly 50 years of operations in a major, first-of-its-kind nuclear complex and safely get rid of them, leaving the facility cold, dark, dry and ready for whatever end state is ultimately determined by the United States Department of Energy (DOE). And do it in four years, with a constantly changing workforce and steadily declining funding. The goal was to reduce the overall operating staff by 93% and budget by 94%. The facilities, F Canyon and its adjoined sister, FB Line, are located at SRS, a 310-square-mile nuclear reservation near Aiken, S.C., owned by DOE and managed by Washington Group International subsidiary Washington Savannah River Company (WSRC). These facilities were supported by more than 50 surrounding buildings, whose purpose was to provide support services during operations. The radiological, chemical and industrial hazards inventory in the old buildings was significant. The historical mission at F Canyon was to extract plutonium-239 and uranium-238 from irradiated spent nuclear fuel through chemical processing. FB Line's mission included conversion of plutonium solutions into metal, characterization, stabilization and packaging, and storage of both metal and oxide forms. The plutonium metal was sent to another DOE site for use in weapons. Deactivation in F Canyon began when chemical separations activities were completed in 2002, and a cross-functional project team concept was implemented to successfully

  11. 75 FR 25310 - Port Harbor Railroad, Inc.-Lease and Operation Exemption-Line of Tri-City Regional Port District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... Surface Transportation Board Port Harbor Railroad, Inc.--Lease and Operation Exemption--Line of Tri-City... operate, a 2.97-mile line of railroad extending between milepost 0.00 and milepost 2.97 in Madison County..., the industries located on Tri-City's property receive service over the rail lines of the...

  12. 78 FR 9450 - Grand Trunk Western Railroad Company-Acquisition of Operating Easement-CSX Transportation, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-08

    ... Line), subject to employee protective conditions. The Leewood-Aulon Line is currently owned by CSXT. Illinois Central Railroad Company, a GTW affiliate, operates over it via trackage rights. Along with the proposed easement acquisition by GTW, CSXT would retain local and overhead trackage rights over the...

  13. 75 FR 74768 - Madison Terminal Railway, LLC-Lease and Operation Exemption-Line of Railroad in Dane County, WI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Madison Terminal Railway, LLC--Lease and Operation Exemption-- Line of Railroad in Dane County, WI Madison Terminal Railway, LLC (MTR), a noncarrier, has filed a verified...

  14. 77 FR 66663 - Tongue River Railroad Company, Inc.-Rail Construction and Operation-in Custer, Powder River and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Tongue River Railroad Company, Inc.--Rail Construction and Operation--in Custer, Powder River and Rosebud Counties, MT.; Correction to the Notice of Intent To Prepare...

  15. 77 FR 71872 - Tongue River Railroad Company, Inc.-Rail Construction and Operation-in Custer, Powder River and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Tongue River Railroad Company, Inc.--Rail Construction and Operation--in Custer, Powder River and Rosebud Counties, MT; Extension of Comment Period for the Draft Scope of...

  16. 77 FR 67863 - Tongue River Railroad Company, Inc.-Rail Construction and Operation-in Custer, Powder River and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Tongue River Railroad Company, Inc.--Rail Construction and Operation--in Custer, Powder River and Rosebud Counties, Montana: Update to the Notice of Intent to Prepare...

  17. 75 FR 68399 - Lancaster & Chester Railroad, LLC-Acquisition and Operation Exemption-Line of Lancaster & Chester...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... served and published in the Federal Register on Friday, October 15, 2010 (75 FR 63,532-33). In the notice... Surface Transportation Board Lancaster & Chester Railroad, LLC--Acquisition and Operation Exemption--Line of Lancaster & Chester Railway Company AGENCY: Surface Transportation Board, DOT. ACTION:...

  18. 75 FR 11991 - ABC & D Recycling, Inc.-Lease and Operation Exemption-a Line of Railroad in Ware, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board ABC & D Recycling, Inc.--Lease and Operation Exemption--a Line of Railroad in Ware, MA ABC & D Recycling, Inc. (ABC & D), a noncarrier, has filed a verified notice of...

  19. 78 FR 60374 - Allentown and Auburn Railroad Company, Inc.-Change in Operators Exemption-Rail Line of Kutztown...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-01

    ... Surface Transportation Board Allentown and Auburn Railroad Company, Inc.--Change in Operators Exemption... filed with the Surface Transportation Board, 395 E Street SW., Washington, DC 20423-0001. In addition... Street NW., Washington, DC 20005. Board decisions and notices are available on our Web site at...

  20. 76 FR 22749 - Camden & Southern Railroad, Inc.-Lease and Operation Exemption-Camden Area Industrial Development...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... Surface Transportation Board Camden & Southern Railroad, Inc.--Lease and Operation Exemption-- Camden Area... & Russellville R.R., Ouachita R.R., & Camden & S. R.R., 76 FR 21797-98 (Apr. 18, 2011). The transaction is... pleadings, referring to Docket No. FD 35483, must be filed with the Surface Transportation Board, 395...

  1. 78 FR 802 - Heart of Texas Railroad, L.P.-Acquisition and Operation Exemption-Gulf Colorado & San Saba...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... Surface Transportation Board Heart of Texas Railroad, L.P.--Acquisition and Operation Exemption--Gulf... original and 10 copies of all pleadings, referring to Docket No. FD 35710, must be filed with the Surface... 20006. Board decisions and notices are available on our Web site at www.stb.dot.gov . By the...

  2. 78 FR 13932 - Yellowstone Valley Railroad, L.L.C.-Discontinuance of Lease and Trackage Rights Operations...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Yellowstone Valley Railroad, L.L.C.--Discontinuance of Lease and Trackage Rights Operations Exemption--In Richland, Sheridan, Roosevelt, and Daniels Counties, Mont., and...

  3. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices... controlling locomotive may use an electronic device only if the employee is not using the device in such a way... controlling locomotive must have each electronic device turned off with any earpiece removed from the ear—...

  4. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices... controlling locomotive may use an electronic device only if the employee is not using the device in such a way... controlling locomotive must have each electronic device turned off with any earpiece removed from the ear—...

  5. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices... controlling locomotive may use an electronic device only if the employee is not using the device in such a way... controlling locomotive must have each electronic device turned off with any earpiece removed from the ear—...

  6. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices... controlling locomotive may use an electronic device only if the employee is not using the device in such a way... controlling locomotive must have each electronic device turned off with any earpiece removed from the ear—...

  7. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices... controlling locomotive may use an electronic device only if the employee is not using the device in such a way... controlling locomotive must have each electronic device turned off with any earpiece removed from the ear—...

  8. 78 FR 54955 - Indiana Eastern Railroad, LLC, d/b/a Ohio South Central Railroad-Change in Operators Exemption...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... Operators Exemption--Rail Lines of the City of Jackson, Ohio, in Jackson, Vinton, and Ross Counties, Ohio...): (1) From milepost 91.6 at RA Junction near Richmond Dale, Ross County, to milepost 95.5 at West Junction, Ross County; (2) from milepost 112.3 at West Junction to milepost 127.5 near Hamden,...

  9. 75 FR 68398 - Golden Triangle Railroad, LLC-Acquisition and Operation Exemption-Golden Triangle Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ...) and to operate approximately 8.6 miles of rail line between milepost 8.6 (Trinity, Miss.) and milepost 0.0 (Triangle Jct., Miss.), including the side track at Bell Avenue in Lowndes County, Miss.; and (2... to continue to interchange traffic (1) at Columbus, Miss., with Alabama & Gulf Coast Railway,...

  10. National facilities study. Volume 4: Space operations facilities task group

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The principal objectives of the National Facilities Study (NFS) were to: (1) determine where U.S. facilities do not meet national aerospace needs; (2) define new facilities required to make U.S. capabilities 'world class' where such improvements are in the national interest; (3) define where consolidation and phase-out of existing facilities is appropriate; and (4) develop a long-term national plan for world-class facility acquisition and shared usage. The Space Operations Facilities Task Group defined discrete tasks to accomplish the above objectives within the scope of the study. An assessment of national space operations facilities was conducted to determine the nation's capability to meet the requirements of space operations during the next 30 years. The mission model used in the study to define facility requirements is described in Volume 3. Based on this model, the major focus of the Task Group was to identify any substantive overlap or underutilization of space operations facilities and to identify any facility shortfalls that would necessitate facility upgrades or new facilities. The focus of this initial study was directed toward facility recommendations related to consolidations, closures, enhancements, and upgrades considered necessary to efficiently and effectively support the baseline requirements model. Activities related to identifying facility needs or recommendations for enhancing U.S. international competitiveness and achieving world-class capability, where appropriate, were deferred to a subsequent study phase.

  11. 77 FR 65446 - Turtle Creek Industrial Railroad, Inc.-Acquisition and Operation Exemption-Consolidated Rail...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ...--Consolidated Rail Corporation Turtle Creek Industrial Railroad, Inc. (TCKR), a noncarrier and a wholly owned... under 49 CFR 1150.31 to acquire from Consolidated Rail Corporation (Conrail) and to...

  12. Data Management Facility Operations Plan

    SciTech Connect

    Keck, Nicole N

    2014-06-30

    The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.

  13. The highway and railroad operating environments for hazardous shipments in the U.S.-safer in the '90s?

    SciTech Connect

    Saricks, C. L.; Tompkins, M. M.

    2000-04-01

    This paper seeks to illuminate the status of transportation safety and risk for large-quantity shipments of spent commercial reactor fuel and mixed and hazardous wastes by examining road and rail accident and vehicular travel data from the mid-1990s. Of special interest are the effect of speed limit changes on controlled-access expressways (chiefly the Interstate Highway System) and the possible effect of season-to-season climatic variation on road transport. We found that improvements in railroad technology and infrastructure have created a safer overall operating environment for railroad freight shipments. We also found recent evidence of an increase in accident rates of heavy combination trucks in states that have raised highway speed limits. Finally, cold weather increases road transport risk, while conditions associated with higher ambient temperatures do not. This last finding is in contrast to rail transport, for which the literature associates both hot and cold temperature extremes with higher accident rates.

  14. Mars mission science operations facilities design

    NASA Technical Reports Server (NTRS)

    Norris, Jeffrey S.; Wales, Roxana; Powell, Mark W.; Backes, Paul G.; Steinke, Robert C.

    2002-01-01

    A variety of designs for Mars rover and lander science operations centers are discussed in this paper, beginning with a brief description of the Pathfinder science operations facility and its strengths and limitations. Particular attention is then paid to lessons learned in the design and use of operations facilities for a series of mission-like field tests of the FIDO prototype Mars rover. These lessons are then applied to a proposed science operations facilities design for the 2003 Mars Exploration Rover (MER) mission. Issues discussed include equipment selection, facilities layout, collaborative interfaces, scalability, and dual-purpose environments. The paper concludes with a discussion of advanced concepts for future mission operations centers, including collaborative immersive interfaces and distributed operations. This paper's intended audience includes operations facility and situation room designers and the users of these environments.

  15. Plans for National Ignition Facility operations training and operations procedures

    SciTech Connect

    Mantrom, D.D., LLNL

    1998-06-01

    A preliminary plan for National Ignition Facility (NIF) Operations training developed for the 200+ staff anticipated to operate the NIF facility is discussed. We also address the development and implementation of NIF Operations procedures. These procedures serve as an essential part of the staff training program. A special aspect of NIF Operations procedures is that they will be on-line with electronic links to design, operations, and test databases, and will likely incorporate electronic checklists and archiving capabilities.

  16. Operations on the National Ignition Facility

    DOE PAGESBeta

    Brereton, Sandra J.; Burr, Robert F.; Folta, Peg; Keane, Christopher J.; Kohut, Thomas R.; Merritt, Bernard T.; Van Wonterghem, Bruno M.

    2014-03-24

    The National Ignition Facility (NIF) is a fully operational high energy density physics experimental user facility that focuses 192 laser beams onto a small target at the center of a target chamber. This paper describes how we execute experimental shots on the NIF, both from the user perspective and from the facility perspective. We review the planning processes and tools used to facilitate operations. Safety and radiological aspects of NIF’s operations are discussed. We also describe efforts to continuously improve operations and further increase shot rate.

  17. Shoreham Railroad Bridge, Former Addison County Railroad (later, Rutland Railroad, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Shoreham Railroad Bridge, Former Addison County Railroad (later, Rutland Railroad, Addison Branch), spanning Lemon Fair River above Richville Pond, west of East Shoreham Road, Shoreham, Addison County, VT

  18. Operating procedures: Fusion Experiments Analysis Facility

    SciTech Connect

    Lerche, R.A.; Carey, R.W.

    1984-03-20

    The Fusion Experiments Analysis Facility (FEAF) is a computer facility based on a DEC VAX 11/780 computer. It became operational in late 1982. At that time two manuals were written to aid users and staff in their interactions with the facility. This manual is designed as a reference to assist the FEAF staff in carrying out their responsibilities. It is meant to supplement equipment and software manuals supplied by the vendors. Also this manual provides the FEAF staff with a set of consistent, written guidelines for the daily operation of the facility.

  19. Operation and Maintenance of Wastewater Treatment Facilities.

    ERIC Educational Resources Information Center

    Drury, Douglas D.

    1978-01-01

    Presents the 1978 literature review of wastewater treatment: (1) operators, training, and certification; (2) solutions to operating problems; (3) collection systems; (4) operations manuals; (5) wastewater treatment facility case histories; (5) land application; and (6) treatment of industrial wastes. A list of 36 references is also presented. (HM)

  20. APPA's New Operational Guidelines for Educational Facilities

    ERIC Educational Resources Information Center

    Bigger, Alan S.

    2011-01-01

    Nearly 25 years ago a group of APPA members and facilities managers started to discuss an idea and to plant a seed about the need for a document, or series of documents, that would explain the need for staffing facilities operations and the implication of such staffing on levels of service. As the demand for increased budget cuts reached seismic…

  1. School Facilities Maintenance and Operations.

    ERIC Educational Resources Information Center

    Association of School Business Officials of the United States and Canada, Park Ridge, IL. Research Corp.

    This publication presents a series of field-proven school energy conservation, management, maintenance, and operations practices and ideas. Also included are the names, addresses, and phone numbers of individuals and organizations to contact for more detailed information. The brief summaries are grouped into six sections. "Planning and Managing…

  2. Initial operation of the Holifield facility

    SciTech Connect

    Ball, J.B.

    1982-01-01

    The Holifield Heavy Ion Research Facility (HHIRF) is located at Oak Ridge National Laboratory and operated, by the Physics Division, as a national user facility for research in heavy-ion science. The facility operates two accelerators: the new Pelletron electrostatic accelerator, designed to accelerate all ions at terminal potentials up to 25 million volts, and the Oak Ridge Isochronous Cyclotron (ORIC) which, in addition to its stand-alone capabilities, has been modified to serve also as a booster accelerator for ion beams from the Pelletron. In addition, a number of state-of-the-art experimental devices, a new data acquisition computer system, and special user accommodations have been implemented as part of the facility. The construction of the facility was completed officially in June of this year. This paper reports on the present status of facility operation, observations from testing and running of the 25 MV Pelletron, experience with coupled operation of the Pelletron with the ORIC booster, and a brief summary of the experimental devices now available at the facility.

  3. Space Station tethered refueling facility operations

    NASA Technical Reports Server (NTRS)

    Kiefel, E. R.; Rudolph, L. K.; Fester, D. A.

    1986-01-01

    The space-based orbital transfer vehicle will require a large cryogenic fuel storage facility at the Space Station. An alternative to fuel storage onboard the Space Station, is on a tethered orbital refueling facility (TORF) which is separated from the Space Station by a sufficient distance to induce a gravity gradient to settle the propellants. Facility operations are a major concern associated with a tethered LO2/LH2 storage depot. A study was carried out to analyze these operations so as to identify the preferred TORF deployment direction (up or down) and whether the TORF should be permanently or intermittently deployed. The analyses considered safety, contamination, rendezvous, servicing, transportation rate, communication, and viewing. An upwardly, intermittently deployed facility is the preferred configuration for a tethered cryogenic fuel storage.

  4. 77 FR 18881 - North Louisiana & Arkansas Railroad, Inc.-Lease and Operation Exemption-Line of Southeastern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-28

    ...--Line of Southeastern Arkansas Economic Development District North Louisiana & Arkansas Railroad, Inc... from Southeastern Arkansas Economic Development District (SAEDD), a noncarrier political subdivision...

  5. Defense waste processing facility radioactive operations. Part 1 - operating experience

    SciTech Connect

    Little, D.B.; Gee, J.T.; Barnes, W.M.

    1997-12-31

    The Savannah River Site`s Defense Waste Processing Facility (DWPF) near Aiken, SC is the nation`s first and the world`s largest vitrification facility. Following a ten year construction program and a 3 year non-radioactive test program, DWPF began radioactive operations in March 1996. This paper presents the results of the first 9 months of radioactive operations. Topics include: operations of the remote processing equipment reliability, and decontamination facilities for the remote processing equipment. Key equipment discussed includes process pumps, telerobotic manipulators, infrared camera, Holledge{trademark} level gauges and in-cell (remote) cranes. Information is presented regarding equipment at the conclusion of the DWPF test program it also discussed, with special emphasis on agitator blades and cooling/heating coil wear. 3 refs., 4 figs.

  6. Operating large controlled thermonuclear fusion research facilities

    SciTech Connect

    Gaudreau, M.P.J.; Tarrh, J.M.; Post, R.S.; Thomas, P.

    1987-10-01

    The MIT Tara Tandem Mirror is a large, state of the art controlled thermonuclear fusion research facility. Over the six years of its design, implementation, and operation, every effort was made to minimize cost and maximize performance by using the best and latest hardware, software, and scientific and operational techniques. After reviewing all major DOE fusion facilities, an independent DOE review committee concluded that the Tara operation was the most automated and efficient of all DOE facilities. This paper includes a review of the key elements of the Tara design, construction, operation, management, physics milestones, and funding that led to this success. We emphasize a chronological description of how the system evolved from the proposal stage to a mature device with an emphasis on the basic philosophies behind the implementation process. This description can serve both as a qualitative and quantitative database for future large experiment planning. It includes actual final costs and manpower spent as well as actual run and maintenance schedules, number of data shots, major system failures, etc. The paper concludes with recommendations for the next generation of facilities. 13 refs., 15 figs., 3 tabs.

  7. 75 FR 28673 - Carolina Coastal Railway, Inc.-Acquisition and Operation Exemption-Morehead & South Fork Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... Federal Register on January 15, 2010 (75 FR 2580), titled ``Carolina Coastal Railway, Inc.--Acquisition... & South Fork Railroad Co. AGENCY: Surface Transportation Board. ACTION: Correction to Notice of... acquire, by assignment, the lease of Morehead & South Fork Railroad Co., Inc. (MHSF) with North...

  8. 77 FR 30588 - R.J. Corman Railroad Company/Pennsylvania Lines Inc.-Construction and Operation Exemption-In...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board R.J. Corman Railroad Company/Pennsylvania Lines Inc.-- Construction and... prior approval requirements of 49 U.S.C. 10901 for R.J. Corman Railroad Company/Pennsylvania Lines...

  9. Recent operational experiments at the LANSCE facility

    SciTech Connect

    Rybarcyk, Lawrence J

    2010-09-15

    The Los Alamos Neutron Science Center (LANSCE) consists of a pulsed 800-MeV room-temperature linear accelerator and an 800-MeV accumulator ring. It simultaneously provides H{sup +} and H{sup -} beams to several user facilities that have their own distinctive requirements, e.g. intensity, chopping pattern, duty factor, etc.. This multibeam operation presents challenges both from the standpoint of meeting the individual requirements but also achieving good overall performance for the integrated operation. Various aspects of more recent operations including the some of these challenges will be discussed.

  10. Lunar launch and landing facilities and operations

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The Florida Institute of Technology established an Interdisciplinary Design Team to design a lunar based facility whose primary function involves launch and landing operations for future moon missions. Both manned and unmanned flight operations were considered in the study with particular design emphasis on the utilization (or reutilization) of all materials available on the moon. This resource availability includes man-made materials which might arrive in the form of expendable landing vehicles as well as in situ lunar minerals. From an engineering standpoint, all such materials are considered as to their suitability for constructing new lunar facilities and/or repairing or expanding existing structures. Also considered in this design study was a determination of the feasibility of using naturally occurring lunar materials to provide fuel components to support lunar launch operations. Conventional launch and landing operations similar to those used during the Apollo Program were investigated as well as less conventional techniques such as rail guns and electromagnetic mass drivers. The Advanced Space Design team consisted of students majoring in Physics and Space Science as well as Electrical, Mechanical, Chemical and Ocean Engineering.

  11. 75 FR 1447 - Alaska Railroad Corporation-Construction and Operation Exemption-Rail Line Between North Pole and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... Between North Pole and Delta Junction, AK By petition filed on July 6, 2007, Alaska Railroad Corporation... side of the community of Delta Junction. In a decision served on October 4, 2007, the Board...

  12. First Operational Experience Of The CNGS Facility

    NASA Astrophysics Data System (ADS)

    Gschwendtner, E.; Pardons, A.; Bruno, L.; Clement, M.; Efthymiopoulos, I.; Elsener, K.; Meddahi, M.; Rangod, S.; Vincke, H.

    2008-02-01

    The CNGS project (CERN Neutrinos to Gran Sasso) aims at directly detecting νμ-ντ oscillation. An intense muon-neutrino beam (1017νμ/day) is generated at CERN and directed towards the Gran Sasso National Laboratory, LNGS, in Italy, where the ντ will be detected in large and complex detectors. An overview of the CNGS beam facility is given. The performance of the primary and secondary beam line during beam commissioning and physics operation is discussed. Modifications on the magnetic focusing lenses (horn and reflector) are described.

  13. Government and the midwest railroads: notes on the demise of the Chicago, Rock Island and Pacific Railroad Company

    SciTech Connect

    Ingram, J.W.

    1980-01-01

    The Chicago, Rock Island and Pacific Railroad Co. declared bankruptcy in 1975. Reorganization efforts after entering bankruptcy are reported. The company sought federal and private funds and revamped its operating procedures to reduce the capital intensiveness of railroad activities. Railroad labor unions balked at the company's new policy to reduce personnel in order to operate a light-density railroad. Strikes created more cash flow problems, and the federal government directed another railroad company to take over operations of the line. Such federal favoring of unions over railroads poses a bleak future for the future maintenance of individual railroad companies.

  14. Operations experience at the Bevalac radiotherapy facility

    SciTech Connect

    Alonso, J.R.; Criswell, T.L.; Howard, J.; Chu, W.T.; Singh, R.P.; Geller, D.; Nyman, M.

    1981-03-01

    During the first years of Bevalac operation the biomedical effort concentrated on radiobiology work, laying the foundation for patient radiotherapy. A dedicated radiotherapy area was created in 1978, and in 1979 full-scale patient treatment was begun. As of now over 500 treatments with carbon, neon and argon beams have been delivered to about 50 patients, some as boosts from other modalities and some as complete heavy ion treatments. Up to 12 patients per day have been treated in this facility. Continuing efforts in refining techniques and operating procedures are increasing efficiency and accuracy of treatments, and are contributing to the alleviation of scheduling difficulties caused by the unique requirements of radiotherapy with human patients.

  15. Fuel Supply Shutdown Facility Interim Operational Safety Requirements

    SciTech Connect

    BENECKE, M.W.

    2000-09-06

    The Interim Operational Safety Requirements for the Fuel Supply Shutdown (FSS) Facility define acceptable conditions, safe boundaries, bases thereof, and management of administrative controls to ensure safe operation of the facility.

  16. Sulphite Railroad Bridge1896, Title Sheet Sulphite Railroad Bridge, Former ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Sulphite Railroad Bridge-1896, Title Sheet - Sulphite Railroad Bridge, Former Boston & Maine Railroad (originally Tilton & Franklin Railroad) spanning Winnipesautee River, Franklin, Merrimack County, NH

  17. 49 CFR 840.3 - Notification of railroad accidents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Notification of railroad accidents. 840.3 Section... SAFETY BOARD RULES PERTAINING TO NOTIFICATION OF RAILROAD ACCIDENTS § 840.3 Notification of railroad accidents. The operator of a railroad shall notify the Board by telephoning the National Response Center...

  18. 49 CFR 840.3 - Notification of railroad accidents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Notification of railroad accidents. 840.3 Section... SAFETY BOARD RULES PERTAINING TO NOTIFICATION OF RAILROAD ACCIDENTS § 840.3 Notification of railroad accidents. The operator of a railroad shall notify the Board by telephoning the National Response Center...

  19. 49 CFR 840.3 - Notification of railroad accidents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Notification of railroad accidents. 840.3 Section... SAFETY BOARD RULES PERTAINING TO NOTIFICATION OF RAILROAD ACCIDENTS § 840.3 Notification of railroad accidents. The operator of a railroad shall notify the Board by telephoning the National Response Center...

  20. 49 CFR 840.3 - Notification of railroad accidents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Notification of railroad accidents. 840.3 Section... SAFETY BOARD RULES PERTAINING TO NOTIFICATION OF RAILROAD ACCIDENTS § 840.3 Notification of railroad accidents. The operator of a railroad shall notify the Board by telephoning the National Response Center...

  1. 49 CFR 840.3 - Notification of railroad accidents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Notification of railroad accidents. 840.3 Section... SAFETY BOARD RULES PERTAINING TO NOTIFICATION OF RAILROAD ACCIDENTS § 840.3 Notification of railroad accidents. The operator of a railroad shall notify the Board by telephoning the National Response Center...

  2. Facility Will Help Transition Models Into Operations

    NASA Astrophysics Data System (ADS)

    Kumar, Mohi

    2009-02-01

    The U.S. National Oceanic and Atmospheric Administration's Space Weather Prediction Center (NOAA SWPC), in partnership with the U.S. Air Force Weather Agency (AFWA), is establishing a center to promote and facilitate the transition of space weather models to operations. The new facility, called the Developmental Testbed Center (DTC), will take models used by researchers and rigorously test them to see if they can withstand continued use as viable warning systems. If a model used in a space weather warning system crashes or fails to perform well, severe consequences can result. These include increased radiation risks to astronauts and people traveling on high-altitude flights, national security vulnerabilities from the loss of military satellite communications, and the cost of replacing damaged military and commercial spacecraft.

  3. 75 FR 56653 - Middletown & New Jersey Railroad, LLC-Lease and Operation Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-16

    ... Warwick, NY. The Lease Agreement will expire on December 31, 2020. As required at 49 CFR 1150.43(h), M&NJ... & New Jersey Railroad, LLC (M&NJ), a Class III rail carrier, has filed a verified notice of exemption... conjunction with the lease of the NSR rail lines, M&NJ states that it will also sublease connecting...

  4. 77 FR 61049 - North Louisiana & Arkansas Railroad, Inc.-Acquisition and Operation Exemption-Line of Lake...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... Exemption--Line of Lake Providence Port Commission North Louisiana & Arkansas Railroad, Inc. (NLA), a Class III rail carrier, has filed a verified notice of exemption under 49 CFR 1150.41 to lease from Lake... milepost 471.00, at or near a certain highway barn near Lake Providence, La., and milepost 472.25 in...

  5. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  6. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  7. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  8. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  9. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  10. 47 CFR 73.1615 - Operation during modification of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Operation during modification of facilities. 73... modification of facilities. When the licensee of an existing AM, FM, TV or Class A TV station is in the process of modifying existing facilities as authorized by a construction permit and determines it...

  11. A study of the operation of selected national research facilities

    NASA Technical Reports Server (NTRS)

    Eisner, M.

    1974-01-01

    The operation of national research facilities was studied. Conclusions of the study show that a strong resident scientific staff is required for successful facility operation. No unique scheme of scientific management is revealed except for the obvious fact that the management must be responsive to the users needs and requirements. Users groups provide a convenient channel through which these needs and requirements are communicated.

  12. Shoreham Railroad Bridge, Title Sheet Shoreham Railroad Bridge, Former ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Shoreham Railroad Bridge, Title Sheet - Shoreham Railroad Bridge, Former Addison County Railroad (later, Rutland Railroad, Addison Branch), spanning Lemon Fair River above Richville Pond, west of East Shoreham Road, Shoreham, Addison County, VT

  13. 49 CFR 236.787a - Railroad.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... Railroad means any form of non-highway ground transportation that runs on rails or electromagnetic... Consolidated Rail Corporation on January 1, 1979; and (b) High speed ground transportation systems that connect... traditional railroads; but does not include rapid transit operations in an urban area that are not...

  14. 49 CFR 236.787a - Railroad.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... Railroad means any form of non-highway ground transportation that runs on rails or electromagnetic... Consolidated Rail Corporation on January 1, 1979; and (b) High speed ground transportation systems that connect... traditional railroads; but does not include rapid transit operations in an urban area that are not...

  15. School Facilities Maintenance and Operations Manual.

    ERIC Educational Resources Information Center

    Association of School Business Officials International, Reston, VA.

    Often a community's largest single investment is in its physical plants, including public school buildings and grounds. An essential factor in efficient school district operation is a well-organized, responsive plant operations and maintenance division. Maintenance has generally been defined as those services, activities, and procedures concerned…

  16. Railroad electrification in America's future: an assessment of prospects and impacts. Final report

    SciTech Connect

    White, R.K.; Yabroff, I.W.; Dickson, E.M.; Zink, R.A.; Gray, M.E.; Moon, A.E.

    1980-01-01

    Such considerations as the level of traffic, the relative financial health of individual railroads, the capacity of the associated supply and engineering/construction industries, and the logical connecting points at classifying yards, as well as the national interest value of creating a continuous system, continental in scope, were used to construct a scenario for railroad electrification that closely approximates how an electrification program might be implemented. For the economic reasons cited, much of the US railroad system would remain conventionally powered. This scenario provides for an electrified network involving 14 mainlines operated by 10 companies that could transport much of the nation's rail-borne freight. Five years of planning and engineering work would be required for each link before construction could begin. With 1000 miles or less of electrified route per year, 14 years would be needed to construct the 9000-mile network of our scenario. (The scenario constructed runs from 1980 to 1998.) The analysis was aided with the construction of the SRI Railroad Industry Model. Basically a model of industry operations and finances, the model produces income statements and balance sheets at yearly intervals. Railroad energy costs, railroad freight levels, maintenance costs, purchases and leases of rooling stock, electrification facility investments, future inflation, rate setting practices, annual depreciation, taxes, and profits were calculated.

  17. Developing operational safety requirements for non-nuclear facilities

    SciTech Connect

    Mahn, J.A.

    1997-11-01

    Little guidance has been provided by the DOE for developing appropriate Operational Safety Requirements (OSR) for non-nuclear facility safety documents. For a period of time, Chapter 2 of DOE/AL Supplemental Order 5481.lB provided format guidance for non-reactor nuclear facility OSRs when this supplemental order applied to both nuclear and non-nuclear facilities. Thus, DOE Albuquerque Operations Office personnel still want to see non-nuclear facility OSRs in accordance with the supplemental order (i.e., in terms of Safety Limits, Limiting Conditions for Operation, and Administrative Controls). Furthermore, they want to see a clear correlation between the OSRs and the results of a facility safety analysis. This paper demonstrates how OSRs can be rather simply derived from the results of a risk assessment performed using the ``binning`` methodology of SAND95-0320.

  18. Lunar landing and launch facilities and operations

    NASA Technical Reports Server (NTRS)

    1988-01-01

    A preliminary design of a lunar landing and launch facility for a Phase 3 lunar base is formulated. A single multipurpose vehicle for the lunar module is assumed. Three traffic levels are envisioned: 6, 12, and 24 landings/launches per year. The facility is broken down into nine major design items. A conceptual description of each of these items is included. Preliminary sizes, capacities, and/or other relevant design data for some of these items are obtained. A quonset hut tent-like structure constructed of aluminum rods and aluminized mylar panels is proposed. This structure is used to provide a constant thermal environment for the lunar modules. A structural design and thermal analysis is presented. Two independent designs for a bridge crane to unload/load heavy cargo from the lunar module are included. Preliminary investigations into cryogenic propellant storage and handling, landing/launch guidance and control, and lunar module maintenance requirements are performed. Also, an initial study into advanced concepts for application to Phase 4 or 5 lunar bases has been completed in a report on capturing, condensing, and recycling the exhaust plume from a lunar launch.

  19. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  20. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  1. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  2. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  3. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  4. Spent nuclear fuel project cold vacuum drying facility operations manual

    SciTech Connect

    IRWIN, J.J.

    1999-05-12

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998) and, the HNF-SD-SNF-DRD-002, 1997, Cold Vacuum Drying Facility Design Requirements, Rev. 3a. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence, and has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

  5. Operational summary of an electric propulsion long term test facility

    NASA Technical Reports Server (NTRS)

    Trump, G. E.; James, E. L.; Bechtel, R. T.

    1982-01-01

    An automated test facility capable of simultaneously operating three 2.5 kW, 30-cm mercury ion thrusters and their power processors is described, along with a test program conducted for the documentation of thruster characteristics as a function of time. Facility controls are analog, with full redundancy, so that in the event of malfunction the facility automaticcally activates a backup mode and notifies an operator. Test data are recorded by a central data collection system and processed as daily averages. The facility has operated continuously for a period of 37 months, over which nine mercury ion thrusters and four power processor units accumulated a total of over 14,500 hours of thruster operating time.

  6. Reusing Railroad Stations. A Report.

    ERIC Educational Resources Information Center

    Educational Facilities Labs., Inc., New York, NY.

    Railroad stations are a unique American resource that should continue to serve public and private interests even though their original purpose may have passed. Large stations should be considered as prominent civic structures whose redevelopment could offer significant opportunities to influence the future character, economy, and operation of…

  7. Nuclear materials accounting, helping the facility operator

    SciTech Connect

    Barnes, J.W.; Thomas, K.E.

    1986-01-01

    A modern materials control and accounting (MC and A) system can provide major benefits to production personnel. It can enhance understanding of process systems performance, localize and reconcile material losses, and identify instruments that are out-of-calibration or malfunctioning. Examples of the above MC and A system applications are given. We show how Operations personnel can use an MC and A system to their advantage rather than letting the MC and A system take advantage of them.

  8. 78 FR 4981 - Pacific Imperial Railroad, Inc.-Change in Operator Exemption-Rail Line of San Diego and Arizona...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ... Diego and Arizona Eastern Railway Company (SD&AE). The change in operators for the line is being... SD&AE and its parent, San Diego Metropolitan Transit Development Board. This change in operators...

  9. Recent Enhancements to the National Transonic Facility (Mixed Mode Operations)

    NASA Technical Reports Server (NTRS)

    Kilgore, W. Allen; Chan, David; Balakrishna, S.; Wahls, Richard A.

    2006-01-01

    The U.S. National Transonic Facility continues to make enhancements to provide quality data in a safe, efficient and cost effective method for aerodynamic ground testing. Recent enhancements discussed in this paper include the development of a Mixed-mode of operations that combine Air-mode operations with Nitrogen-mode operations. This implementation and operational results of this new Mixed-mode expands the ambient temperature transonic region of testing beyond the Air-mode limitations at a significantly reduced cost over Nitrogen Mode operation.

  10. Description and Operation of the A3 Subscale Facility

    NASA Technical Reports Server (NTRS)

    Saunders, G. P.; Varner, D. G.; Grover, J. B.

    2010-01-01

    The purpose of this paper is to give an overview of the general design and operation of the A3 Subscale test facility. The goal is to provide the reader with a general understanding of what the major facility systems are, where they are located, and how they are used to meet the objectives supporting the design of the A3 altitude rocket test facility. This paper also provides the reader with the background information prior to reading the subsequent papers detailing the design and test results of the various systems described herein.

  11. KSC facilities status and planned management operations. [for Shuttle launches

    NASA Technical Reports Server (NTRS)

    Gray, R. H.; Omalley, T. J.

    1979-01-01

    A status report is presented on facilities and planned operations at the Kennedy Space Center with reference to Space Shuttle launch activities. The facilities are essentially complete, with all new construction and modifications to existing buildings almost finished. Some activity is still in progress at Pad A and on the Mobile Launcher due to changes in requirements but is not expected to affect the launch schedule. The installation and testing of the ground checkout equipment that will be used to test the flight hardware is now in operation. The Launch Processing System is currently supporting the development of the applications software that will perform the testing of this flight hardware.

  12. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment...

  13. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment...

  14. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment...

  15. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment...

  16. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment...

  17. All purpose railroad car

    SciTech Connect

    Terlecky, B.S.

    1987-01-13

    An all purpose railroad car is described for transporting wheeled trailers and containers, the car comprising an elongated frame supported by wheel trucks, combined hitch and bolster means adjacent one end of the frame for selectively receiving and releasably retaining a trailer king pin and one end of a container. A means is spaced from the combined hitch and bolster means for selectively receiving and supporting the wheels of a wheeled trailer and the other end of a container. The combined hitch and bolster means is an integral rigid structure with the hitch fixed in spaced relationship to the bolster with both the hitch and the bolster permanently disposed in operative position to respectively receive and retain a trailer king pin and a container.

  18. 76 FR 1666 - Susquehanna Union Railroad Company-Control Exemption-North Shore Railroad Company, Nittany & Bald...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... Company, Nittany & Bald Eagle Railroad Company, Shamokin Valley Railroad Company, Juniata Valley Railroad... Class III railroads: North Shore Railroad Company, Nittany & Bald Eagle Railroad Company,...

  19. APET methodology for Defense Waste Processing Facility: Mode C operation

    SciTech Connect

    Taylor, R.P. Jr.; Massey, W.M.

    1995-04-01

    Safe operation of SRS facilities continues to be the highest priority of the Savannah River Site (SRS). One of these facilities, the Defense Waste Processing Facility or DWPF, is currently undergoing cold chemical runs to verify the design and construction preparatory to hot startup in 1995. The DWPFF is a facility designed to convert the waste currently stored in tanks at the 200-Area tank farm into a form that is suitable for long term storage in engineered surface facilities and, ultimately, geologic isolation. As a part of the program to ensure safe operation of the DWPF, a probabilistic Safety Assessment of the DWPF has been completed. The results of this analysis are incorporated into the Safety Analysis Report (SAR) for DWPF. The usual practice in preparation of Safety Analysis Reports is to include only a conservative analysis of certain design basis accidents. A major part of a Probabilistic Safety Assessment is the development and quantification of an Accident Progression Event Tree or APET. The APET provides a probabilistic representation of potential sequences along which an accident may progress. The methodology used to determine the risk of operation of the DWPF borrows heavily from methods applied to the Probabilistic Safety Assessment of SRS reactors and to some commercial reactors. This report describes the Accident Progression Event Tree developed for the Probabilistic Safety Assessment of the DWPF.

  20. Remotely operated facility for in situ solidification of fissile uranium

    SciTech Connect

    McGinnis, C.P.; Collins, E.D.; Patton, B.D.

    1986-01-01

    A heavily shielded, remotely operated facility, located within the Radiochemical processing Plant at Oak Ridge National Laboratory (ORNL), has been designed and is being operated to convert approx.1000 kg of fissile uranium (containing approx.75% /sup 235/U, approx.10% /sup 233/U, and approx.140 ppM /sup 232/U) from a nitrate solution (130 g of uranium per L) to a solid oxide form. This project, the Consolidated Edison Uranium Solidification Program (CEUSP), is being carried out in order to prepare a stable uranium form for longterm storage. This paper describes the solidification process selected, the equipment and facilities required, the experimental work performed to ensure successful operation, some problems that were solved, and the initial operations.

  1. Man-Vehicle Systems Research Facility - Design and operating characteristics

    NASA Technical Reports Server (NTRS)

    Shiner, Robert J.; Sullivan, Barry T.

    1992-01-01

    This paper describes the full-mission flight simulation facility at the NASA Ames Research Center. The Man-Vehicle Systems Research Facility (MVSRF) supports aeronautical human factors research and consists of two full-mission flight simulators and an air-traffic-control simulator. The facility is used for a broad range of human factors research in both conventional and advanced aviation systems. The objectives of the research are to improve the understanding of the causes and effects of human errors in aviation operations, and to limit their occurrence. The facility is used to: (1) develop fundamental analytical expressions of the functional performance characteristics of aircraft flight crews; (2) formulate principles and design criteria for aviation environments; (3) evaluate the integration of subsystems in contemporary flight and air traffic control scenarios; and (4) develop training and simulation technologies.

  2. ARM Operations and Engineering Procedure Mobile Facility Site Startup

    SciTech Connect

    Voyles, Jimmy W

    2015-05-01

    This procedure exists to define the key milestones, necessary steps, and process rules required to commission and operate an Atmospheric Radiation Measurement (ARM) Mobile Facility (AMF), with a specific focus toward on-time product delivery to the ARM Data Archive. The overall objective is to have the physical infrastructure, networking and communications, and instrument calibration, grooming, and alignment (CG&A) completed with data products available from the ARM Data Archive by the Operational Start Date milestone.

  3. Evaluating Operational Irregularities at Hanford's Environmental Restoration Disposal Facility

    SciTech Connect

    Benson, C.H.; Albright, W.H.; Ray, D.P.; Smegal, J.S.; Robertson, Jr.O.C.; Gupta, D.C.

    2008-07-01

    This paper describes the findings of an independent technical review that investigated operational irregularities at the Environmental Restoration Disposal Facility (ERDF) at Hanford. The ERDF is a large-scale disposal facility authorized by the Environmental Protection Agency and the Washington State Department of Ecology to receive waste from Hanford cleanup activities. The irregularities included (i) failure to recognize that pumps for the leachate collection system were not functioning for an extended period and (ii) falsification of compaction data by a technician responsible for monitoring waste placement in the ERDF. Other issues related to compaction of the waste were also considered during the independent technical review. A number of important lessons were learned as part of this review. These lessons are summarized in the paper. They are relevant to the ERDF as well as other landfill operations at Department of Energy facilities. (authors)

  4. LOTIS facility initial operational capabilities: flexible user interfaces

    NASA Astrophysics Data System (ADS)

    Hutchison, Sheldon B.; Bell, Raymond M., Jr.; Borota, Stephen A.; Cuzner, Gregor J.; Cochrane, Andrew T.

    2010-10-01

    The Large Optical Test and Integration Site (LOTIS) at the Lockheed Martin Space Systems Company in Sunnyvale, CA, has successfully reached Initial Operational Capability (IOC). LOTIS is designed for the verification and testing of optical systems. The facility consists of a large, temperature stabilized vacuum chamber that also functions as a class 10k cleanroom. Within this chamber and atop an advanced vibration-isolation bench are the 6.5 meter diameter LOTIS Collimator and Scene Generator, LOTIS alignment and support equipment. IOC included completion of the entire facility as well as operation of the LOTIS collimator in air. Wavefront properties of the collimator will be described as well as facility vibration isolation properties and turbulence levels within the collimator test chamber. User-specific test capabilities will also be addressed for two major areas of concern.

  5. 40 CFR 264.31 - Design and operation of facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....31 Section 264.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES...-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water...

  6. 40 CFR 264.31 - Design and operation of facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....31 Section 264.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES...-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water...

  7. Federal Guidelines - Operation and Maintenance of Wastewater Treatment Facilities.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Water Programs.

    This document contains the federal guidelines for meeting the specific requirements of the Federal Water Pollution Control Act Amendments of 1972. These guidelines are also intended to assist in meeting the regulations for grant assisted facility construction and to provide information on the key elements to be included in the operation plans for…

  8. 40 CFR 264.31 - Design and operation of facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....31 Section 264.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES...-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water...

  9. Moonport: A History of Apollo Launch Facilities and Operations

    NASA Technical Reports Server (NTRS)

    Benson, C. D.; Faherty, W. B.

    1978-01-01

    The development of the Apollo f launch facilities and launch operations is described from the beginning of design through the final launch. Management techniques, innovation in automation, and testing on the ground to avoid failures in space are among the topics covered. The impact of the Apollo program on the citrus groves and quiet beaches of Florida's east coast is included.

  10. 40 CFR 264.31 - Design and operation of facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....31 Section 264.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES...-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water...

  11. Railroad and locomotive technology roadmap.

    SciTech Connect

    Stodolsky, F.; Gaines, L.; Energy Systems

    2003-02-24

    Railroads are important to the U.S. economy. They transport freight efficiently, requiring less energy and emitting fewer pollutants than other modes of surface transportation. While the railroad industry has steadily improved its fuel efficiency--by 16% over the last decade--more can, and needs to, be done. The ability of locomotive manufacturers to conduct research into fuel efficiency and emissions reduction is limited by the small number of locomotives manufactured annually. Each year for the last five years, the two North American locomotive manufacturers--General Electric Transportation Systems and the Electro-Motive Division of General Motors--have together sold about 800 locomotives in the United States. With such a small number of units over which research costs can be spread, outside help is needed to investigate all possible ways to reduce fuel usage and emissions. Because fuel costs represent a significant portion of the total operating costs of a railroad, fuel efficiency has always been an important factor in the design of locomotives and in the operations of a railroad. However, fuel efficiency has recently become even more critical with the introduction of strict emission standards by the U.S. Environmental Protection Agency, to be implemented in stages (Tiers 0, 1, and 2) between 2000 and 2005. Some of the technologies that could be employed to meet the emission standards may negatively affect fuel economy--by as much as 10-15% when emissions are reduced to Tier 1 levels. Lowering fuel economy by that magnitude would have a serious impact on the cost to the consumer of goods shipped by rail, on the competitiveness of the railroad industry, and on this country's dependence on foreign oil. Clearly, a joint government/industry R&D program is needed to help catalyze the development of advanced technologies that will substantially reduce locomotive engine emissions while also improving train system energy efficiency. DOE convened an industry

  12. Space facilities: Meeting future needs for research, development, and operations

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The National Facilities Study (NFS) represents an interagency effort to develop a comprehensive and integrated long-term plan for world-class aeronautical and space facilities that meet current and projected needs for commercial and government aerospace research and development and space operations. At the request of NASA and the DOD, the National Research Council's Committee on Space Facilities has reviewed the space related findings of the NFS. The inventory of more than 2800 facilities will be an important resource, especially if it continues to be updated and maintained as the NFS report recommends. The data in the inventory provide the basis for a much better understanding of the resources available in the national facilities infrastructure, as well as extensive information on which to base rational decisions about current and future facilities needs. The working groups have used the inventory data and other information to make a set of recommendations that include estimates of cast savings and steps for implementation. While it is natural that the NFS focused on cost reduction and consolidations, such a study is most useful to future planning if it gives equal weight to guiding the direction of future facilities needed to satisfy legitimate national aspirations. Even in the context of cost reduction through facilities closures and consolidations, the study is timid about recognizing and proposing program changes and realignments of roles and missions to capture what could be significant savings and increased effectiveness. The recommendations of the Committee on Space Facilities are driven by the clear need to be more realistic and precise both in recognizing current incentives and disincentives in the aerospace industry and in forecasting future conditions for U.S. space activities.

  13. 49 CFR 27.71 - Airport facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Access Act rules (49 CFR part 382) for carriers. (g) If an airport operator who receives Federal... 49 Transportation 1 2010-10-01 2010-10-01 false Airport facilities. 27.71 Section 27.71... Administration Programs: Airports, Railroads, and Highways § 27.71 Airport facilities. (a) This section...

  14. Operational Readiness Review: Savannah River Replacement Tritium Facility

    SciTech Connect

    Not Available

    1993-02-01

    The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members.

  15. 76 FR 72752 - Alaska Railroad Corporation-Construction and Operation Exemption-A Rail Line Extension to Port...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ... Line Extension to Port MacKenzie, AK AGENCY: Surface Transportation Board, DOT. ACTION: Notice of... and operate an approximately 35-mile rail line connecting the Port MacKenzie District in south-central... services between Port MacKenzie and the interior of Alaska and would support Port MacKenzie's...

  16. Johnson County Community College and Burlington Northern Railroad.

    ERIC Educational Resources Information Center

    Radakovich, Dan; Lindsay, Susan; Osborn, Bill

    In order to serve the educational needs of the business community and generate revenues, Johnson County Community College (Kansas) formed a partnership with Burlington Northern Railroad in which the railroad's training facility would be relocated on the college's campus. This report documents the development of that relationship, its purpose, and…

  17. Umatilla Hatchery Satellite Facilities Operation and Maintenance; 1996 Annual Report.

    SciTech Connect

    Rowan, Gerald D.

    1997-06-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow satellite facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead and Three Mile Dam is used for holding and spawning adult fall chinook and coho salmon. Bonifer, Minthorn, Imeques and Thornhollow facilities are operated for acclimation and release of juvenile salmon and summer steelhead. The main goal of acclimation is to reduce stress from trucking prior to release and improve imprinting of juvenile salmonids in the Umatilla River Basin. Juveniles are transported to the acclimation facilities primarily from Umatilla and Bonneville Hatcheries. This report details activities associated with operation and maintenance of the Bonifer, Minthorn, Imeques, Thornhollow and Three Mile Dam facilities in 1996.

  18. The National Transonic Facility - Status and operational planning

    NASA Technical Reports Server (NTRS)

    Howell, R. R.

    1980-01-01

    The National Transonic Facility is scheduled to be completed in 1982. Several technical concerns remain, including thermal stress constraints which may limit the rate at which temperatures can be changed, seal performance in the cryogenic environment, and the tunnel process controls which could affect data acquisition rate. The current design affords the capability of dealing with all these concerns if they become problems. The outstanding instrument need is a real-time model surface deformation measurement system. Finally, an examination of the occupancy cost and the cost of liquid nitrogen for high Reynolds number tests indicates that operating costs should not be an inhibiting factor in the use of the facility.

  19. High-Pressure Gaseous Burner (HPGB) Facility Became Operational

    NASA Technical Reports Server (NTRS)

    Nguyen, Quang-Viet

    2003-01-01

    A gas-fueled high-pressure combustion facility with optical access, developed over the last 3 years, is now collecting research data in a production mode. The High-Pressure Gaseous Burner (HPGB) rig at the NASA Glenn Research Center can operate at sustained pressures up to 60 atm with a variety of gaseous fuels and liquid jet fuel. The facility is unique because it is the only continuous-flow, hydrogen-capable 60-atm rig in the world with optical access. It will provide researchers with new insights into flame conditions that simulate the environment inside the ultra-high-pressure-ratio combustion chambers of tomorrow s advanced aircraft engines. The facility provides optical access to the flame zone through four fused-silica optical windows, enabling the calibration of nonintrusive optical diagnostics to measure chemical species and temperature. The data from the HPGB rig enable the validation of numerical codes that simulate gas turbine combustors.

  20. Pre-operational safety appraisal Tritiated Scrap Recovery Facility, Mound facility

    SciTech Connect

    Dauby, J.J.; Flanagan, T.M.; Metcalf, L.W.; Rhinehammer, T.B.

    1996-07-01

    The purpose of this report is to identify, assess, and document the hazards which are associated with the proposed operation of the Tritiated Scrap Recovery Facility at Mound Facility. A Pre-operational Safety Appraisal is a requirement as stated in Department of Energy Order 5481.1, Safety Analysis and Review System. The operations to be conducted in the new Tritiated Scrap Waste Recovery Facility are not new, but a continuation of a prime mission of Mound`s i.e. recovery of tritium from waste produced throughout the DOE complex. The new facility is a replacement of an existing process started in the early 1960`s and incorporates numerous design changes to enhance personnel and environmental safety. This report also documents the safety of a one time operation involving the recovery of tritium from material obtained by the Department of Energy from the State of Arizona. This project will involve the processing of 240,000 curies of tritium contained in glass ampoules that were to be used in items such as luminous dial watches. These were manufactured by the now defunct American Atomics Corporation, Tucson, Arizona.

  1. Neighborhood Facilities: A Study of Operating Facilities. Community Development Evaluation Series, Number 1.

    ERIC Educational Resources Information Center

    Department of Housing and Urban Development, Washington, DC.

    This report, the first of a series attempting to provide information on community development programs, Federal processes, and policies, presents an evaluation of the operating centers constructed with Housing and Urban Development Neighborhood Facilities grants. The program evaluated provides grants to help local public bodies finance development…

  2. Feasibility study for a transportation operations system cask maintenance facility

    SciTech Connect

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

  3. Framework for Integrating Safety, Operations, Security, and Safeguards in the Design and Operation of Nuclear Facilities

    SciTech Connect

    Darby, John L.; Horak, Karl Emanuel; LaChance, Jeffrey L.; Tolk, Keith Michael; Whitehead, Donnie Wayne

    2007-10-01

    The US is currently on the brink of a nuclear renaissance that will result in near-term construction of new nuclear power plants. In addition, the Department of Energy’s (DOE) ambitious new Global Nuclear Energy Partnership (GNEP) program includes facilities for reprocessing spent nuclear fuel and reactors for transmuting safeguards material. The use of nuclear power and material has inherent safety, security, and safeguards (SSS) concerns that can impact the operation of the facilities. Recent concern over terrorist attacks and nuclear proliferation led to an increased emphasis on security and safeguard issues as well as the more traditional safety emphasis. To meet both domestic and international requirements, nuclear facilities include specific SSS measures that are identified and evaluated through the use of detailed analysis techniques. In the past, these individual assessments have not been integrated, which led to inefficient and costly design and operational requirements. This report provides a framework for a new paradigm where safety, operations, security, and safeguards (SOSS) are integrated into the design and operation of a new facility to decrease cost and increase effectiveness. Although the focus of this framework is on new nuclear facilities, most of the concepts could be applied to any new, high-risk facility.

  4. Embracing Safe Ground Test Facility Operations and Maintenance

    NASA Technical Reports Server (NTRS)

    Dunn, Steven C.; Green, Donald R.

    2010-01-01

    Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.

  5. Operational readiness: an integral part of the facility planning process.

    PubMed

    Kidd, LeeAnne; Howe, Rob

    2014-01-01

    Large capital building projects benefit from an operational readiness strategy prior to new facility occupancy. St. Joseph's Healthcare used a structured approach for their readiness planning that included individual work plan meetings, tools for ensuring integration across programs and services and process improvement support to ensure a smooth transition. Over 1100 staff were oriented using a Train-the-Trainer model. Significant effort was required to co-ordinate the customized training, which involved "staffing up" to ensure sufficient resources for backfill. Operational readiness planning places additional demands on managers, requiring support and assistance from dedicated resources both prior to occupancy and several months post-move.

  6. National Transonic Facility: A review of the operational plan

    NASA Technical Reports Server (NTRS)

    Liepmann, H. W.; Black, R. E.; Dietz, R. O.; Kirchner, M. E.; Sears, W. R.

    1980-01-01

    The proposed National Transonic Facility (NTF) operational plan is reviewed. The NTF will provide an aerodynamic test capability significantly exceeding that of other transonic regime wind tunnels now available. A limited number of academic research program that might use the NTF are suggested. It is concluded that the NTF operational plan is useful for management, technical, instrumentation, and model building techniques available in the specialized field of aerodynamic analysis and simulation. It is also suggested that NASA hold an annual conference to discuss wind tunnel research results and to report on developments that will further improve the utilization and cost effectiveness of the NTF and other wind tunnels.

  7. Design and operation of an outdoor microalgae test facility

    SciTech Connect

    Weissman, J.C.; Tillett, D.M.; Goebel, R.P. )

    1989-10-01

    The objective of the project covered in this report is to establish and operate a facility in the American Southwest to test the concept of producing microalgae on a large scale. This microalgae would then be used as a feedstock for producing liquid fuels. The site chosen for this project was an existing water research station in Roswell, New Mexico; the climate and water resources are representative of those in the Southwest. For this project, researchers tested specific designs, modes of operation, and strains of microalgae; proposed and evaluated modifications to technological concepts; and assessed the progress toward meeting cost objectives.

  8. Operational readiness: an integral part of the facility planning process.

    PubMed

    Kidd, LeeAnne; Howe, Rob

    2014-01-01

    Large capital building projects benefit from an operational readiness strategy prior to new facility occupancy. St. Joseph's Healthcare used a structured approach for their readiness planning that included individual work plan meetings, tools for ensuring integration across programs and services and process improvement support to ensure a smooth transition. Over 1100 staff were oriented using a Train-the-Trainer model. Significant effort was required to co-ordinate the customized training, which involved "staffing up" to ensure sufficient resources for backfill. Operational readiness planning places additional demands on managers, requiring support and assistance from dedicated resources both prior to occupancy and several months post-move. PMID:25906468

  9. National Ignition Facility Control and Information System Operational Tools

    SciTech Connect

    Marshall, C D; Beeler, R G; Bowers, G A; Carey, R W; Fisher, J M; Foxworthy, C B; Frazier, T M; Mathisen, D G; Lagin, L J; Rhodes, J J; Shaw, M J

    2009-10-08

    The National Ignition Facility (NIF) in Livermore, California, is the world's highest-energy laser fusion system and one of the premier large scale scientific projects in the United States. The system is designed to setup and fire a laser shot to a fusion ignition or high energy density target at rates up to a shot every 4 hours. NIF has 192 laser beams delivering up to 1.8 MJ of energy to a {approx}2 mm target that is planned to produce >100 billion atm of pressure and temperatures of >100 million degrees centigrade. NIF is housed in a ten-story building footprint the size of three football fields as shown in Fig. 1. Commissioning was recently completed and NIF will be formally dedicated at Lawrence Livermore National Laboratory on May 29, 2009. The control system has 60,000 hardware controls points and employs 2 million lines of control system code. The control room has highly automated equipment setup prior to firing laser system shots. This automation has a data driven implementation that is conducive to dynamic modification and optimization depending on the shot goals defined by the end user experimenters. NIF has extensive facility machine history and infrastructure maintenance workflow tools both under development and deployed. An extensive operational tools suite has been developed to support facility operations including experimental shot setup, machine readiness, machine health and safety, and machine history. The following paragraphs discuss the current state and future upgrades to these four categories of operational tools.

  10. Risk management for operations of the LANL Critical Experiments Facility

    SciTech Connect

    Paternoster, R.; Butterfield, K.

    1998-12-31

    The Los Alamos Critical Experiments Facility (LACEF) currently operates two burst reactors (Godiva-IV and Skua), one solution assembly [the Solution High-Energy Burst Assembly (SHEBA)], two fast-spectrum benchmark assemblies (Flattop and Big Ten), and five general-purpose remote assembly machines that may be configured with nuclear materials and assembled by remote control. Special nuclear materials storage vaults support these and other operations at the site. With this diverse set of operations, several approaches are possible in the analysis and management of risk. The most conservative approach would be to write a safety analysis report (SAR) for each assembly and experiment. A more cost-effective approach is to analyze the probability and consequences of several classes of operations representative of operations on each critical assembly machine and envelope the bounding case accidents. Although the neutron physics of these machines varies widely, the operations performed at LACEF fall into four operational modes: steady-state mode, approach-to-critical mode, prompt burst mode, and nuclear material operations, which can include critical assembly fuel loading. The operational sequences of each mode are very nearly identical, whether operated on one assembly machine or another. The use of an envelope approach to accident analysis is facilitated by the use of classes of operations and the use of bounding case consequence analysis. A simple fault tree analysis of operational modes helps resolve which operations are sensitive to human error and which are initiated by hardware of software failures. Where possible, these errors and failures are blocked by TSR LCOs. Future work will determine the probability of accidents with various initiators.

  11. 78 FR 37660 - American Surface Lines, LLC-Acquisition and Operation Exemption-Mikrut Properties, LLLP

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... Canadian Pacific Railroad Company (CP) at or near Pelzer Street to a transloading facility owned and... tracks that connect to CP's line have been operated pursuant to a private siding agreement between CP...

  12. SILEX ground segment control facilities and flight operations

    NASA Astrophysics Data System (ADS)

    Demelenne, Benoit; Tolker-Nielsen, Toni; Guillen, Jean-Claude

    1999-04-01

    The European Space Agency is going to conduct an inter orbit link experiment which will connect a low Earth orbiting satellite and a Geostationary satellite via optical terminals. This experiment has been called SILEX (Semiconductor Inter satellite Link Experiment). Two payloads have been built. One called PASTEL (PASsager de TELecommunication) has been embarked on the French Earth observation satellite SPOT4 which has been launched successfully in March 1998. The future European experimental data relay satellite ARTEMIS (Advanced Relay and TEchnology MISsion), which will route the data to ground, will carry the OPALE terminal (Optical Payload Experiment). The European Space Agency is responsible for the operation of both terminals. Due to the complexity and experimental character of this new optical technology, the development, preparation and validation of the ground segment control facilities required a long series of technical and operational qualification tests. This paper is presenting the operations concept and the early results of the PASTEL in orbit operations.

  13. 3. EXTERIOR VIEW TO THE NORTHEAST OF A RAILROAD CAR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. EXTERIOR VIEW TO THE NORTHEAST OF A RAILROAD CAR ON THE TRACKS AND THE PARTS OF AN ENGINE STAND. - Nevada Test Site, Pluto Facility, Area 26, Wahmonie Flats, Cane Spring Road, Mercury, Nye County, NV

  14. PIRATE: A Remotely Operable Telescope Facility for Research and Education

    NASA Astrophysics Data System (ADS)

    Holmes, S.; Kolb, U.; Haswell, C. A.; Burwitz, V.; Lucas, R. J.; Rodriguez, J.; Rolfe, S. M.; Rostron, J.; Barker, J.

    2011-10-01

    We introduce PIRATE, a new remotely operable telescope facility for use in research and education, constructed from off-the-shelf hardware, operated by The Open University. We focus on the PIRATE Mark 1 operational phase, in which PIRATE was equipped with a widely used 0.35 m Schmidt-Cassegrain system (now replaced with a 0.425 m corrected Dall-Kirkham astrograph). Situated at the Observatori Astronòmic de Mallorca, PIRATE is currently used to follow up potential transiting extrasolar planet candidates produced by the SuperWASP North experiment, as well as to hunt for novae in M31 and other nearby galaxies. It is operated by a mixture of commercially available software and proprietary software developed at the Open University. We discuss problems associated with performing precision time-series photometry when using a German Equatorial Mount, investigating the overall performance of such off-the-shelf solutions in both research and teaching applications. We conclude that PIRATE is a cost-effective research facility, and it also provides exciting prospects for undergraduate astronomy. PIRATE has broken new ground in offering practical astronomy education to distance-learning students in their own homes.

  15. The National Ignition Facility: alignment from construction to shot operations

    NASA Astrophysics Data System (ADS)

    Burkhart, S. C.; Bliss, E.; Di Nicola, P.; Kalantar, D.; Lowe-Webb, R.; McCarville, T.; Nelson, D.; Salmon, T.; Schindler, T.; Villanueva, J.; Wilhelmsen, K.

    2010-08-01

    The National Ignition Facility in Livermore, California, completed it's commissioning milestone on March 10, 2009 when it fired all 192 beams at a combined energy of 1.1 MJ at 351nm. Subsequently, a target shot series from August through December of 2009 culminated in scale ignition target design experiments up to 1.2 MJ in the National Ignition Campaign. Preparations are underway through the first half of of 2010 leading to DT ignition and gain experiments in the fall of 2010 into 2011. The top level requirement for beam pointing to target of 50μm rms is the culmination of 15 years of engineering design of a stable facility, commissioning of precision alignment, and precise shot operations controls. Key design documents which guided this project were published in the mid 1990's, driving systems designs. Precision Survey methods were used throughout construction, commissioning and operations for precision placement. Rigorous commissioning processes were used to ensure and validate placement and alignment throughout commissioning and in present day operations. Accurate and rapid system alignment during operations is accomplished by an impressive controls system to align and validate alignment readiness, assuring machine safety and productive experiments.

  16. The insertion device magnetic measurement facility: Prototype and operational procedures

    SciTech Connect

    Burkel, L.; Dejus, R.; Maines, J.; O'Brien, J.; Vasserman, I. . Advanced Photon Source Accelerator Systems Div.); Pfleuger, J. , Hamburg . Hamburger Synchrotronstrahlungslabor)

    1993-03-01

    This report is a description of the current status of the magnetic measurement facility and is a basic instructional manual for the operation of the facility and its components. Please refer to the appendices for more detailed information about specific components and procedures. The purpose of the magnetic measurement facility is to take accurate measurements of the magnetic field in the gay of the IDs in order to determine the effect of the ID on the stored particle beam and the emitted radiation. The facility will also play an important role when evaluating new ideas, novel devices, and inhouse prototypes as part of the ongoing research and development program at the APS. The measurements will be performed with both moving search coils and moving Hall probes. The IDs will be evaluated by computer modeling of the emitted radiation for any given (measured) magnetic field map. The quality of the magnetic field will be described in terms of integrated multipoles for the effect on Storage Ring performance and in terms of the derived trajectories for the emitted radiation. Before being installed on the Storage Ring, every device will be measured and characterized to assure that it is compatible with Storage Ring requirements and radiation specifications. The accuracy that the APS needs to achieve for magnetic measurements will be based on these specifications.

  17. 49 CFR 220.302 - Operating rules implementing the requirements of this subpart.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.302 Operating rules implementing the requirements of this subpart. Each railroad shall...

  18. 49 CFR 220.302 - Operating rules implementing the requirements of this subpart.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.302 Operating rules implementing the requirements of this subpart. Each railroad shall...

  19. 49 CFR 220.302 - Operating rules implementing the requirements of this subpart.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.302 Operating rules implementing the requirements of this subpart. Each railroad shall...

  20. 49 CFR 220.302 - Operating rules implementing the requirements of this subpart.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.302 Operating rules implementing the requirements of this subpart. Each railroad shall...

  1. 49 CFR 220.302 - Operating rules implementing the requirements of this subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.302 Operating rules implementing the requirements of this subpart. Each railroad shall...

  2. EnergySolution's Clive Disposal Facility Operational Research Model - 13475

    SciTech Connect

    Nissley, Paul; Berry, Joanne

    2013-07-01

    EnergySolutions owns and operates a licensed, commercial low-level radioactive waste disposal facility located in Clive, Utah. The Clive site receives low-level radioactive waste from various locations within the United States via bulk truck, containerised truck, enclosed truck, bulk rail-cars, rail boxcars, and rail inter-modals. Waste packages are unloaded, characterized, processed, and disposed of at the Clive site. Examples of low-level radioactive waste arriving at Clive include, but are not limited to, contaminated soil/debris, spent nuclear power plant components, and medical waste. Generators of low-level radioactive waste typically include nuclear power plants, hospitals, national laboratories, and various United States government operated waste sites. Over the past few years, poor economic conditions have significantly reduced the number of shipments to Clive. With less revenue coming in from processing shipments, Clive needed to keep its expenses down if it was going to maintain past levels of profitability. The Operational Research group of EnergySolutions were asked to develop a simulation model to help identify any improvement opportunities that would increase overall operating efficiency and reduce costs at the Clive Facility. The Clive operations research model simulates the receipt, movement, and processing requirements of shipments arriving at the facility. The model includes shipment schedules, processing times of various waste types, labor requirements, shift schedules, and site equipment availability. The Clive operations research model has been developed using the WITNESS{sup TM} process simulation software, which is developed by the Lanner Group. The major goals of this project were to: - identify processing bottlenecks that could reduce the turnaround time from shipment arrival to disposal; - evaluate the use (or idle time) of labor and equipment; - project future operational requirements under different forecasted scenarios. By identifying

  3. Railroad routing and costing. Final report

    SciTech Connect

    Bronzini, M.S.; Sherman, D.M.

    1986-08-01

    This research has the objective of providing reliable tools for forecasting the costs of transporting coal from the coal supply regions to the coal demand regions of the United States. The present work was devoted primarily to improving and updating the Railroad Routing Model (RRM) and related data base developed earlier. The railroad network data were modified to incorporate the extensive structural changes which occurred during the period 1980 to 1982. All of the rail time, energy, and cost functions were completely reestimated, taking advantage of improved railrod operations and cost simulators and recent research on railroad costs. After a review of the latest research on railroad routing in large networks, the RRM was refined and tailored to the problem of finding likely routes and estimating fully allocated carrier costs for coal shipments. A new RRM routing algorithm finds routes which satisfy the dual railroad objectives of maximizing the carrier's share of total shipment revenue and minimizing cost. Five utilities tested and demonstrated the new RRM and data base in a series of case studies. These utilities provided data on 38 coal moves with haul distances of 200 to 1700 miles, including a mixture of both existing and prospective movements. The RRM was found to produce credible results. Full and effective use of these improved tools for railroad routing and costing has been facilitated through additional work to develop an interactive system with improved data base management capabilities and expanded cost estimating features.

  4. Lunar Transportation Facilities and Operations Study, option 2

    NASA Technical Reports Server (NTRS)

    1992-01-01

    During the Option 2 period of the Lunar Transportation Facilities and Operations Study (LTFOS), a joint McDonnell Douglas Space Systems Company Kennedy Space Center (MDSSC-KSC) and National Aeronautics and Space Administration Kennedy Space Center (NASA-KSC) Study team conducted a comparison of the functional testing of the RL-10 and Space Shuttle Main Engine, a quick-look impact assessment of the Synthesis Group Report, and a detailed assessment of the Synthesis Group Report. The results of these KSC LTFOS team efforts are included. The most recent study task effort was a detailed assessment of the Synthesis Group Report. The assessment was conducted to determine the impact on planetary launch and landing facilities and operations. The result of that effort is a report entitled 'Analysis of the Synthesis Group Report, its Architectures and their Impacts on PSS Launch and Landing Operations' and is contained in Appendix A. The report is structured in a briefing format with facing pages as opposed to a narrative style. A quick-look assessment of the Synthesis Group Report was conducted to determine the impact of implementing the recommendations of the Synthesis Group on KSC launch facilities and operations. The data was documented in a presentation format as requested by Kennedy Space Center Technology and Advanced Projects Office and is included in Appendix B. Appendix C is a white paper on the comparison of the functional testing of the RL-10 and Space Shuttle Main Engine. The comparison was undertaken to provide insight regarding common test requirements that would be applicable to Lunar and Mars Excursion Vehicles (LEV and MEV).

  5. Lunar Transportation Facilities and Operations Study, option 2

    NASA Astrophysics Data System (ADS)

    1992-02-01

    During the Option 2 period of the Lunar Transportation Facilities and Operations Study (LTFOS), a joint McDonnell Douglas Space Systems Company Kennedy Space Center (MDSSC-KSC) and National Aeronautics and Space Administration Kennedy Space Center (NASA-KSC) Study team conducted a comparison of the functional testing of the RL-10 and Space Shuttle Main Engine, a quick-look impact assessment of the Synthesis Group Report, and a detailed assessment of the Synthesis Group Report. The results of these KSC LTFOS team efforts are included. The most recent study task effort was a detailed assessment of the Synthesis Group Report. The assessment was conducted to determine the impact on planetary launch and landing facilities and operations. The result of that effort is a report entitled 'Analysis of the Synthesis Group Report, its Architectures and their Impacts on PSS Launch and Landing Operations' and is contained in Appendix A. The report is structured in a briefing format with facing pages as opposed to a narrative style. A quick-look assessment of the Synthesis Group Report was conducted to determine the impact of implementing the recommendations of the Synthesis Group on KSC launch facilities and operations. The data was documented in a presentation format as requested by Kennedy Space Center Technology and Advanced Projects Office and is included in Appendix B. Appendix C is a white paper on the comparison of the functional testing of the RL-10 and Space Shuttle Main Engine. The comparison was undertaken to provide insight regarding common test requirements that would be applicable to Lunar and Mars Excursion Vehicles (LEV and MEV).

  6. SSBRP User Operations Facility (UOF) Overview and Development Strategy

    NASA Technical Reports Server (NTRS)

    Picinich, Lou; Stone, Thom; Sun, Charles; Windrem, May; Givens, John J. (Technical Monitor)

    1995-01-01

    This paper will present the Space Station Biological Research Project (SSBRP) User Operations Facility (UOF) architecture and development strategy. A major element of the UOF at NASA Ames Research Center, the Communication and Data System (CDS) will be the primary focus of the discussions. CDS operational, telescience, security, and development objectives will be discussed along with CDS implementation strategy. The implementation strategy discussions will include: Object Oriented Analysis & Design, System & Software Prototyping, and Technology Utilization. A CDS design overview that includes: CDS Context Diagram, CDS Architecture, Object Models, Use Cases, and User Interfaces will also be presented. CDS development brings together "cutting edge" technologies and techniques such as: object oriented development, network security, multimedia networking, web-based data distribution, JAVA, and graphical user interfaces. Use of these "cutting edge" technologies and techniques translates directly to lower development and operations costs.

  7. Five years operating experience at the Fast Flux Test Facility

    SciTech Connect

    Baumhardt, R. J.; Bechtold, R. A.

    1987-04-01

    The Fast Flux Test Facility (FFTF) is a 400 Mw(t), loop-type, sodium-cooled, fast neutron reactor. It is operated by the Westinghouse Hanford Company for the United States Department of Energy at Richland, Washington. The FFTF is a multipurpose test reactor used to irradiate fuels and materials for programs such as Liquid Metal Reactor (LMR) research, fusion research, space power systems, isotope production and international research. FFTF is also used for testing concepts to be used in Advanced Reactors which will be designed to maximize passive safety features and not require complex shutdown systems to assure safe shutdown and heat removal. The FFTF also provides experience in the operation and maintenance of a reactor having prototypic components and systems typical of large LMR (LMFBR) power plants. The 5 year operational performance of the FFTF reactor is discussed in this report. 6 refs., 10 figs., 2 tabs.

  8. Personnel Access Control System Evaluation for National Ignition Facility Operations

    SciTech Connect

    Altenbach, T; Brereton, S.; Hermes, G.; Singh, M.

    2001-06-01

    The purpose of this document is to analyze the baseline Access Control System for the National Ignition Facility (NIF), and to assess its effectiveness at controlling access to hazardous locations during full NIF operations. It reviews the various hazards present during a NIF shot sequence, and evaluates the effectiveness of the applicable set of controls at preventing access while the hazards are present. It considers only those hazards that could potentially be lethal. In addition, various types of technologies that might be applicable at NIF are reviewed, as are systems currently in use at other facilities requiring access control for safety reasons. Recommendations on how this system might be modified to reduce risk are made.

  9. 77 FR 12366 - JP Rail, Inc. d/b/a Southern Railroad Company of New Jersey-Operation Exemption-Rail Line in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... Exemption--Rail Line in Salem County, N.J. JP Rail, Inc. d/b/a Southern Railroad Company of New Jersey (JP... Salem County, N.J. (Salem), as follows: (1) Between the connection with Consolidated Rail Corporation at approximately milepost 11.0 in Swedesboro, N.J., and approximately milepost 28.4 at Salem, and (2) the...

  10. Operational Concept for the Smart Landing Facility (SLF)

    NASA Technical Reports Server (NTRS)

    Thompson, S. D.; Bussolari, S. R.

    2001-01-01

    The purpose of this document is to describe an operational concept for the Smart Landing Facility (SLF). The SLF is proposed as a component of the Small Aircraft Transportation System (SATS) and is envisioned to utilize Communication, Navigation, Surveillance and Air Traffic Management (CNS/ATM) technologies to support higher-volume air traffic operations in a wider variety of weather conditions than are currently possible at airports without an Air Traffic Control Tower (ATCT) or Terminal Radar Approach Control (TRACON). In order to accomplish this, the SLF will provide aircraft sequencing and separation within its terminal airspace (the SLF traffic area) and on the airport surface. The approach taken in this report is to first define and describe the SLF environment and the type of operations and aircraft that must be supported. Services currently provided by an ATCT and TRACON are reviewed and assembled into a set of high-level operational functions. A description of the applicable CNS/ATM technologies that have been deployed in the NAS (National Airspace System) or have been demonstrated to be operationally feasible is presented. A candidate SLF system concept that employs the CNS/ATM technologies is described. This is followed by SLF operational scenarios for minimally-equipped aircraft and for aircraft fully-equipped to make full use of SLF services. An assessment is made of the SLF technology and key research issues are identified.

  11. Report of the Task Group on operation Department of Energy tritium facilities

    SciTech Connect

    Not Available

    1991-10-01

    This report discusses the following topics on the operation of DOE Tritium facilities: Environment, Safety, and Health Aspects of Tritium; Management of Operations and Maintenance Functions; Safe Shutdown of Tritium Facilities; Management of the Facility Safety Envelope; Maintenance of Qualified Tritium Handling Personnel; DOE Tritium Management Strategy; Radiological Control Philosophy; Implementation of DOE Requirements; Management of Tritium Residues; Inconsistent Application of Requirements for Measurement of Tritium Effluents; Interdependence of Tritium Facilities; Technical Communication among Facilities; Incorporation of Confinement Technologies into New Facilities; Operation/Management Requirements for New Tritium Facilities; and Safety Management Issues at Department of Energy Tritium Facilities.

  12. Raccoon Mountain pumped-storage facility operational fish monitoring report

    SciTech Connect

    Buchanan, J.P.; Pasch, R.W.; Smith, A.O.; Swor, C.T.; Tomljanovich, D.A.

    1983-09-01

    The impact of the Raccoon Mountain Pumped-Storage Facility operations on fisheries resources in the Nickajack Reservoir was investigated. Analyses of data collected from 1979 through 1981 on population status and distribution of adults, larvae and eggs are presented with comparisons of preoperational fisheries monitoring data collected by the TVA from 1977 through 1978. Although minor differences in composition of dominant species, and slight declines in standing stock of some species were noted, no major impacts were identified. Appendix B contains a short report entitled Nickajack Reservoir Ictiobine Study 1979 by Edwin Scott Jr. 7 references, 46 figures, 31 tables.

  13. Skylab Medical Experiments Altitude Test /SMEAT/ facility design and operation.

    NASA Technical Reports Server (NTRS)

    Hinners, A. H., Jr.; Correale, J. V.

    1973-01-01

    This paper presents the design approaches and test facility operation methods used to successfully accomplish a 56-day test for Skylab to permit evaluation of selected Skylab medical experiments in a ground test simulation of the Skylab environment with an astronaut crew. The systems designed for this test include the two-gas environmental control system, the fire suppression and detection system, equipment transfer lock, ground support equipment, safety systems, potable water system, waste management system, lighting and power system, television monitoring, communications and recreation systems, and food freezer.

  14. Optimizing Watershed Management by Coordinated Operation of Storing Facilities

    NASA Astrophysics Data System (ADS)

    Anghileri, Daniela; Castelletti, Andrea; Pianosi, Francesca; Soncini-Sessa, Rodolfo; Weber, Enrico

    2013-04-01

    Water storing facilities in a watershed are very often operated independently one to another to meet specific operating objectives, with no information sharing among the operators. This uncoordinated approach might result in upstream-downstream disputes and conflicts among different water users, or inefficiencies in the watershed management, when looked at from the viewpoint of an ideal central decision-maker. In this study, we propose an approach in two steps to design coordination mechanisms at the watershed scale with the ultimate goal of enlarging the space for negotiated agreements between competing uses and improve the overall system efficiency. First, we compute the multi-objective centralized solution to assess the maximum potential benefits of a shift from a sector-by-sector to an ideal fully coordinated perspective. Then, we analyze the Pareto-optimal operating policies to gain insight into suitable strategies to foster cooperation or impose coordination among the involved agents. The approach is demonstrated on an Alpine watershed in Italy where a long lasting conflict exists between upstream hydropower production and downstream irrigation water users. Results show that a coordination mechanism can be designed that drive the current uncoordinated structure towards the performance of the ideal centralized operation.

  15. The Mulberry Cogeneration Facility: Design features and operating success

    SciTech Connect

    Jasper, W.M.; Wierschem, R.A.; Gray, D.C.

    1995-12-31

    The Mulberry Cogeneration Facility is in successful, reliable, and profitable service, with the complex requirements of zero discharge, extensive water treatment, process steam supply, and inlet chillers having been reduced to routine, automated operation. What was initially visualized by the developer as a straightforward combined cycle plant became much more than that as the various requirements for environmental and regulatory compliance became necessities, along with the desire to maximize output and revenues in response to growing power demands. A delicate balance exists between a financially successful cogeneration project and the Owners` obligation to the community and the environment. As competitive pressures grow and expectations of investors, insurers, operators, and the public increase, still more creativity will be required to provide a safe, reliable, cost-effective plant on ever shorter schedules.

  16. Atmospheric Radiation Measurement program climate research facility operations quarterly report.

    SciTech Connect

    Sisterson, D. L.; Decision and Information Sciences

    2006-09-06

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year dating back to 1998. The U.S. Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter for the Southern Great Plains (SGP) site is 2,074.80 hours (0.95 x 2,184 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,965.60 hours (0.90 x 2,184), and that for the Tropical Western Pacific (TWP) locale is 1,856.40 hours (0.85 x 2,184). The OPSMAX time for the ARM Mobile Facility (AMF) is 2,074.80 hours (0.95 x 2,184). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of data in the Archive

  17. 49 CFR 218.39 - Hump operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... apply a locking or blocking device to the control for that switch; and (c) The operator shall then... operations. After June 30, 1984, each railroad that operates a remote control hump yard facility must have in... service employee is required to couple an air hose or to adjust a coupling device and that activity...

  18. 75 FR 39975 - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-13

    ... COMMISSION Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards... significant hazards consideration, notwithstanding the pendency before the Commission of a request for a... FR 37471). Notice of Consideration of Issuance of Amendments to Facility Operating Licenses,...

  19. Operation and Maintenance of Water Pollution Control Facilities: A WPCF White Paper.

    ERIC Educational Resources Information Center

    Hill, William R.; And Others

    1979-01-01

    Presented are the recommendations of the Water Pollution Control Federation for operation and maintenance consideration during the planning design, construction, and operation of wastewater treatment facilities. (CS)

  20. 26 CFR 1.132-7 - Employer-operated eating facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 2 2010-04-01 2010-04-01 false Employer-operated eating facilities. 1.132-7... Employer-operated eating facilities. (a) In general—(1) Condition for exclusion—(i) General rule. The value of meals provided to employees at an employer-operated eating facility for employees is...

  1. 26 CFR 1.132-7 - Employer-operated eating facilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 2 2011-04-01 2011-04-01 false Employer-operated eating facilities. 1.132-7... Employer-operated eating facilities. (a) In general—(1) Condition for exclusion—(i) General rule. The value of meals provided to employees at an employer-operated eating facility for employees is...

  2. 26 CFR 1.132-7 - Employer-operated eating facilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 26 Internal Revenue 2 2013-04-01 2013-04-01 false Employer-operated eating facilities. 1.132-7... Employer-operated eating facilities. (a) In general—(1) Condition for exclusion—(i) General rule. The value of meals provided to employees at an employer-operated eating facility for employees is...

  3. 26 CFR 1.132-7 - Employer-operated eating facilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 26 Internal Revenue 2 2012-04-01 2012-04-01 false Employer-operated eating facilities. 1.132-7... Employer-operated eating facilities. (a) In general—(1) Condition for exclusion—(i) General rule. The value of meals provided to employees at an employer-operated eating facility for employees is...

  4. 26 CFR 1.132-7 - Employer-operated eating facilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 26 Internal Revenue 2 2014-04-01 2014-04-01 false Employer-operated eating facilities. 1.132-7... Employer-operated eating facilities. (a) In general—(1) Condition for exclusion—(i) General rule. The value of meals provided to employees at an employer-operated eating facility for employees is...

  5. Upgrading railroad test track, Pueblo, Colorado

    SciTech Connect

    Briggs, K. III; Chamberlain, K.

    1997-01-01

    The railroad test track (RTT) at the Transportation Technology Center (TTC) in Pueblo, Colo., was constructed in the early 1970s to support high-speed testing of new railroad rolling stock. Through the years it has been used to test a wide range of railroad passenger and freight cars and locomotives. Now, 20 years later, a new high-speed train set is being procured by Amtrak for service in the improved Northeast Corridor. The test facilities at Pueblo will play an important role in acceptance and safety testing of new high-speed train sets in the US. The Federal Railroad Administration (FRA) commissioned a study to review the existing condition of the test track and to make recommendations as to possible improvement options so that the facility would be able to test current and future generations of high-speed rail equipment. This paper describes the condition of the test track and explores ways in which it may be modified to accommodate the testing of high-speed train technologies in the near future and into the next century.

  6. Proton Therapy Facility Planning From a Clinical and Operational Model.

    PubMed

    Das, Indra J; Moskvin, Vadim P; Zhao, Qingya; Cheng, Chee-Wai; Johnstone, Peter A

    2015-10-01

    This paper provides a model for planning a new proton therapy center based on clinical data, referral pattern, beam utilization and technical considerations. The patient-specific data for the depth of targets from skin in each beam angle were reviewed at our center providing megavoltage photon external beam and proton beam therapy respectively. Further, data on insurance providers, disease sites, treatment depths, snout size and the beam angle utilization from the patients treated at our proton facility were collected and analyzed for their utilization and their impact on the facility cost. The most common disease sites treated at our center are head and neck, brain, sarcoma and pediatric malignancies. From this analysis, it is shown that the tumor depth from skin surface has a bimodal distribution (peak at 12 and 26 cm) that has significant impact on the maximum proton energy, requiring the energy in the range of 130-230 MeV. The choice of beam angles also showed a distinct pattern: mainly at 90° and 270°; this indicates that the number of gantries may be minimized. Snout usage data showed that 70% of the patients are treated with 10 cm snouts. The cost of proton beam therapy depends largely on the type of machine, maximum beam energy and the choice of gantry versus fixed beam line. Our study indicates that for a 4-room center, only two gantry rooms could be needed at the present pattern of the patient cohorts, thus significantly reducing the initial capital cost. In the USA, 95% and 100% of patients can be treated with 200 and 230 MeV proton beam respectively. Use of multi-leaf collimators and pencil beam scanning may further reduce the operational cost of the facility.

  7. Proton Therapy Facility Planning From a Clinical and Operational Model.

    PubMed

    Das, Indra J; Moskvin, Vadim P; Zhao, Qingya; Cheng, Chee-Wai; Johnstone, Peter A

    2015-10-01

    This paper provides a model for planning a new proton therapy center based on clinical data, referral pattern, beam utilization and technical considerations. The patient-specific data for the depth of targets from skin in each beam angle were reviewed at our center providing megavoltage photon external beam and proton beam therapy respectively. Further, data on insurance providers, disease sites, treatment depths, snout size and the beam angle utilization from the patients treated at our proton facility were collected and analyzed for their utilization and their impact on the facility cost. The most common disease sites treated at our center are head and neck, brain, sarcoma and pediatric malignancies. From this analysis, it is shown that the tumor depth from skin surface has a bimodal distribution (peak at 12 and 26 cm) that has significant impact on the maximum proton energy, requiring the energy in the range of 130-230 MeV. The choice of beam angles also showed a distinct pattern: mainly at 90° and 270°; this indicates that the number of gantries may be minimized. Snout usage data showed that 70% of the patients are treated with 10 cm snouts. The cost of proton beam therapy depends largely on the type of machine, maximum beam energy and the choice of gantry versus fixed beam line. Our study indicates that for a 4-room center, only two gantry rooms could be needed at the present pattern of the patient cohorts, thus significantly reducing the initial capital cost. In the USA, 95% and 100% of patients can be treated with 200 and 230 MeV proton beam respectively. Use of multi-leaf collimators and pencil beam scanning may further reduce the operational cost of the facility. PMID:24988058

  8. 77 FR 27856 - Tennessee Southern Railroad Company, Patriot Rail, LLC, Patriot Rail Holdings LLC, and Patriot...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... LLC, and Patriot Rail Corp.--Continuance in Control Exemption--Kingman Terminal Railroad, LLC... notice of exemption under 49 CFR 180.2(d)(2) to continue in control of Kingman Terminal Railroad, LLC... filed verified notice of exemption in Kingman Terminal Railroad, LLC--Operation Exemption--...

  9. 23 CFR 646.210 - Classification of projects and railroad share of the cost.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) Pursuant to 23 U.S.C. 130(b), and 49 CFR 1.48: (1) Projects for grade crossing improvements are deemed to... 23 Highways 1 2010-04-01 2010-04-01 false Classification of projects and railroad share of the... ENGINEERING AND TRAFFIC OPERATIONS RAILROADS Railroad-Highway Projects § 646.210 Classification of...

  10. Regulation study for the facility control system design at the Facility Operations Center at TA55

    SciTech Connect

    1994-03-16

    NMT-8 is proposing to upgrade the existing Facility Control System (FCS) located within the Facility Operations Center (FOC) at the TA-55 Plutonium Processing and Handling Facility (PPHF). The FCS modifications will upgrade the existing electronics to provide better reliability of system functions. Changes include replacement of the FCS computers and field multiplex units which are used for transmitting systems data. Data collected at the FCS include temperature, pressure, contact closures, etc., and are used for monitoring and/or control of key systems at TA-55. Monitoring is provided for the electrical power system status, PF-4 HVAC air balance status (Static Differential pressure), HVAC fan system status, site chill water return temperature, fire system information, and radioactive constant air monitors alarm information, site compressed air pressure and other key systems used at TA-55. Control output signals are provided for PF-4 HVAC systems, and selected alarms for criticality, fire, loss of pressure in confinement systems. A detailed description of the FCS modifications is provided in Section 2.

  11. Umatilla Hatchery Satellite Facilities Operation and Maintenance; 1995 Annual Report.

    SciTech Connect

    Rowan, Gerald D.

    1996-05-01

    The Confederated Tribes of the Umatilla Indian Reservoir (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead, fall chinook and coho salmon. Personnel from the ODFW Eastern Oregon Fish Pathology Laboratory in La Grande took samples of tissues and reproductive fluids from Umatilla River summer steelhead and coho salmon broodstock for monitoring and evaluation purposes. Coded-wire tag recovery information was accessed to determine the contribution of Umatilla river releases to ocean, Columbia River and Umatilla River fisheries.

  12. MagLev Cobra: Test Facilities and Operational Experiments

    NASA Astrophysics Data System (ADS)

    Sotelo, G. G.; Dias, D. H. J. N.; de Oliveira, R. A. H.; Ferreira, A. C.; De Andrade, R., Jr.; Stephan, R. M.

    2014-05-01

    The superconducting MagLev technology for transportation systems is becoming mature due to the research and developing effort of recent years. The Brazilian project, named MagLev-Cobra, started in 1998. It has the goal of developing a superconducting levitation vehicle for urban areas. The adopted levitation technology is based on the diamagnetic and the flux pinning properties of YBa2Cu3O7-δ (YBCO) bulk blocks in the interaction with Nd-Fe-B permanent magnets. A laboratory test facility with permanent magnet guideway, linear induction motor and one vehicle module is been built to investigate its operation. The MagLev-Cobra project state of the art is presented in the present paper, describing some construction details of the new test line with 200 m.

  13. Some Operating Experience and Problems Encountered During Operation of a Free-jet Facility

    NASA Technical Reports Server (NTRS)

    Mcaulay, John E; Prince, William R

    1957-01-01

    During a free-jet investigation of a 28-inch ram-jet engine at a Mach number of 2.35, flow pulsation at the engine inlet were discovered which proved to have an effect on the engine performance and operational characteristics, particularly the engine rich blowout limits. This report discusses the finding of the flow pulsations, their elimination, and effect. Other facility characteristics, such as the establishment of flow simulation and the degree of subcritical operation of the diffuser, are also explained.

  14. Global Pursuits: The Underground Railroad

    ERIC Educational Resources Information Center

    School Arts: The Art Education Magazine for Teachers, 2004

    2004-01-01

    This brief article describes Charles T. Webber's oil on canvas painting, "The Underground Railroad, 1893." The subject of this painting is the Underground Railroad, which today has become an American legend. The Underground Railroad was not a systematic means of transportation, but rather a secretive process that allowed fugitive slaves to escape…

  15. Transuranic (Tru) waste volume reduction operations at a plutonium facility

    SciTech Connect

    Cournoyer, Michael E; Nixon, Archie E; Dodge, Robert L; Fife, Keith W; Sandoval, Arnold M; Garcia, Vincent E

    2010-01-01

    Programmatic operations at the Los Alamos National Laboratory Plutonium Facility (TA 55) involve working with various amounts of plutonium and other highly toxic, alpha-emitting materials. The spread of radiological contamination on surfaces, airborne contamination, and excursions of contaminants into the operator's breathing zone are prevented through use of a variety of gloveboxes (the glovebox, coupled with an adequate negative pressure gradient, provides primary confinement). Size-reduction operations on glovebox equipment are a common activity when a process has been discontinued and the room is being modified to support a new customer. The Actin ide Processing Group at TA-55 uses one-meter-long glass columns to process plutonium. Disposal of used columns is a challenge, since they must be size-reduced to get them out of the glovebox. The task is a high-risk operation because the glass shards that are generated can puncture the bag-out bags, leather protectors, glovebox gloves, and the worker's skin when completing the task. One of the Lessons Learned from these operations is that Laboratory management should critically evaluate each hazard and provide more effective measures to prevent personnel injury. A bag made of puncture-resistant material was one of these enhanced controls. We have investigated the effectiveness of these bags and have found that they safely and effectively permit glass objects to be reduced to small pieces with a plastic or rubber mallet; the waste can then be easily poured into a container for removal from the glove box as non-compactable transuranic (TRU) waste. This size-reduction operation reduces solid TRU waste generation by almost 2% times. Replacing one-time-use bag-out bags with multiple-use glass crushing bags also contributes to reducing generated waste. In addition, significant costs from contamination, cleanup, and preparation of incident documentation are avoided. This effort contributes to the Los Alamos National

  16. Railroad management planning. 1974-October, 1981 (citations from the NTIS data base). Report for 1974-Oct 81

    SciTech Connect

    Not Available

    1981-11-01

    Studies are presented of railroad planning concerning operating costs, yard operations, intermodal systems, railway abandonment and consolidation, efficiency in operations and services, freight car utilization systems, forecasting future railroad freight and passenger market and the potential of energy conservation in railroad transportation. (This updated bibliography contains 281 citations, 79 of which are new entries to the previous edition.)

  17. Development and operation of a mobile test facility for education

    NASA Astrophysics Data System (ADS)

    Davis, Christopher T.

    The automotive industry saw a large shift towards vehicle electrification after the turn of the century. It became necessary to ensure that new and existing engineers were qualified to design and calibrate these new systems. To ensure this training, Michigan Tech received a grant to develop a curriculum based around vehicle electrification. As part of this agenda, the Michigan Tech Mobile Laboratory was developed to provide hands-on training for professional engineers and technicians in hybrid electric vehicles and vehicle electrification. The Mobile Lab has since then increased the scope of the delivered curriculum to include other automotive areas and even customizable course content to meet specific needs. This thesis outlines the development of the Mobile Laboratory and its powertrain test facilities. The focus of this thesis is to discuss the different hardware and software systems within the lab and test cells. Detailed instructions on the operation and maintenance of each of the systems are discussed. In addition, this thesis outlines the setup and operation of the necessary equipment for several of the experiments for the on and off campus courses and seminars.

  18. Justification for Continued Operation of the SRS Saltstone Facility (Z-Area)

    SciTech Connect

    Wagner, W.A.

    1999-01-20

    Saltstone Production and Disposal Facilities (Z-Area) are a part of the Defense Waste Processing Facilities (DWPF). Z-Area facilities are just one segment of an integrated waste management and disposal system located at the Savannah River Site (SRS). The bases for the Justification of Continuing Operations (JCO) of the Saltstone Production and Disposal Facilities (Z-Area) at SRS are provided.

  19. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program : Facility Operation and Maintenance Facilities, Annual Report 2003.

    SciTech Connect

    McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie

    2004-01-01

    Anadromous salmonid stocks have declined in both the Grande Ronde River Basin (Lower Snake River Compensation Plan (LSRCP) Status Review Symposium 1998) and in the entire Snake River Basin (Nehlsen et al. 1991), many to the point of extinction. The Grande Ronde River Basin historically supported large populations of fall and spring chinook (Oncorhynchus tshawytscha), sockeye (O. nerka), and coho (O. kisutch) salmon and steelhead trout (O. mykiss) (Nehlsen et al. 1991). The decline of chinook salmon and steelhead populations and extirpation of coho and sockeye salmon in the Grande Ronde River Basin was, in part, a result of construction and operation of hydroelectric facilities, over fishing, and loss and degradation of critical spawning and rearing habitat in the Columbia and Snake River basins (Nehlsen et al. 1991). Hatcheries were built in Oregon, Washington and Idaho under the Lower Snake River Compensation Plan (LSRCP) to compensate for losses of anadromous salmonids due to the construction and operation of the lower four Snake River dams. Lookingglass Hatchery (LGH) on Lookingglass Creek, a tributary of the Grande Ronde River, was completed under LSRCP in 1982 and has served as the main incubation and rearing site for chinook salmon programs for Grande Ronde and Imnaha rivers in Oregon. Despite these hatchery programs, natural spring chinook populations continued to decline resulting in the National Marine Fisheries Service (NMFS) listing Snake River spring/summer chinook salmon as ''threatened'' under the federal Endangered Species Act (1973) on 22 April 1992. Continuing poor escapement levels and declining population trends indicated that Grande Ronde River basin spring chinook salmon were in imminent danger of extinction. These continuing trends led fisheries co-managers in the basin to initiate the Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSSP) in order to prevent extinction and preserve options for use of endemic fish stocks

  20. Quality assurance in the enriched uranium operations NDA facility

    SciTech Connect

    May, P.K.; Ceo, R.N.

    1997-11-01

    The Nondestructive Analysis (NDA) Facility at the Oak Ridge Y-12 Plant has characterized process wastes for Enriched Uranium Operations since 1978. Since that time, over 50,000 items have been analyzed. Analysis results are used to determine whether or not recovery of uranium from process wastes is economically feasible. Our instrument complement includes one large segmented gamma scanner (SGS), two smaller SGS, two solution assay systems (SAS), and Active Well Coincidence Counter (AWCC). The large SGS is used for analyzing High Efficiency Particulate Air (HEPA) filters ant 208-L drums filled with combustible contaminated waste. The smaller SGS are used to analyze 4-L containers of ash and leached residues. The SAS are used to analyze 125 ml bottles of aqueous or organic waste solutions that may contain uranium. The gamma-based NDA techniques are used to identify which process wastes can be discarded, and which must be recycled. The AWCC is used to analyze high-density materials which are not amenable to gamma-ray analysis. 1 ref., 4 figs.

  1. Developing operating procedures for a low-level radioactive waste disposal facility

    SciTech Connect

    Sutherland, A.A.; Miner, G.L.; Grahn, K.F.; Pollard, C.G.

    1993-10-01

    This document is intended to assist persons who are developing operating and emergency procedures for a low-level radioactive waste disposal facility. It provides 25 procedures that are considered to be relatively independent of the characteristics of a disposal facility site, the facility design, and operations at the facility. These generic procedures should form a good starting point for final procedures on their subjects for the disposal facility. In addition, this document provides 55 annotated outlines of other procedures that are common to disposal facilities. The annotated outlines are meant as checklists to assist the developer of new procedures.

  2. Umatilla Hatchery Satellite Facilities; Operations and Maintenance, Annual Report 2001.

    SciTech Connect

    Rowan, Gerald

    2003-05-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem, Thornhollow and Pendleton satellite facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead and Three Mile Dam and South Fork Walla Walla facilities are used for holding and spawning chinook salmon. In some years, Three Mile Dam may also be used for holding and spawning coho salmon. In the spring of 2002, summer steelhead were acclimated and released at Bonifer Pond (54,917), Minthorn Springs (47,521), and Pendleton (54,366). Yearling coho (1,621,857) were also acclimated and released at Pendleton. Yearling spring chinook salmon (876,121) were acclimated and released at Imeques C-mem-ini-kem. At Thornhollow, 520,564 yearling fall chinook and 307,194 subyearling fall chinook were acclimated. In addition, 104,908 spring chinook were transported to Imeques C-mem-ini-kem in November for release in the spring of 2003. CTUIR and ODFW personnel monitored the progress of outmigration for juvenile releases at the Westland Canal juvenile facility. Nearly all juveniles released in the spring migrated downstream prior to the trap being opened in early July. A total of 100 unmarked and 10 marked summer steelhead were collected for broodstock at Three Mile Dam from September 21, 2001, through April 2, 2002. An estimated 180,955 green eggs were taken from 36 females and were transferred to Umatilla Hatchery for incubation and rearing. A total of 560 adult and 26 jack spring chinook salmon were collected for broodstock at Three Mile Dam from April 22 through June 12, 2002

  3. Operator awareness of system status during Fast Flux Test Facility transition to standby

    SciTech Connect

    Gibson, J.L.

    1994-04-01

    A facility in transition, due to a change in its mission or its operating status, begins to depart from a previously well-defined normal mode of operation. The equipment becomes reconfigured or deactivated. In an environment of transition, the Fast Flux Test Facility (FFTF) has employed methods to enhance operator awareness of system status. These methods are described in this report.

  4. The Wallops Flight Facility Rapid Response Range Operations Initiative

    NASA Technical Reports Server (NTRS)

    Underwood, Bruce E.; Kremer, Steven E.

    2004-01-01

    While the dominant focus on short response missions has appropriately centered on the launch vehicle and spacecraft, often overlooked or afterthought phases of these missions have been launch site operations and the activities of launch range organizations. Throughout the history of organized spaceflight, launch ranges have been the bane of flight programs as the source of expense, schedule delays, and seemingly endless requirements. Launch Ranges provide three basic functions: (1) provide an appropriate geographical location to meet orbital other mission trajectory requirements, (2) provide project services such as processing facilities, launch complexes, tracking and data services, and expendable products, and (3) assure safety and property protection to participating personnel and third-parties. The challenge with which launch site authorities continuously struggle, is the inherent conflict arising from projects whose singular concern is execution of their mission, and the range s need to support numerous simultaneous customers. So, while tasks carried out by a launch range committed to a single mission pale in comparison to efforts of a launch vehicle or spacecraft provider and could normally be carried out in a matter of weeks, major launch sites have dozens of active projects separate sponsoring organizations. Accommodating the numerous tasks associated with each mission, when hardware failures, weather, maintenance requirements, and other factors constantly conspire against the range resource schedulers, make the launch range as significant an impediment to responsive missions as launch vehicles and their cargo. The obvious solution to the launch site challenge was implemented years ago when the Department of Defense simply established dedicated infrastructure and personnel to dedicated missions, namely an Inter Continental Ballistic Missile. This however proves to be prohibitively expensive for all but the most urgent of applications. So the challenge

  5. Union Pacific Railroad`s LNG locomotive test program

    SciTech Connect

    Grimaila, B.

    1995-12-31

    Union Pacific Railroad is testing LNG in six locomotives through 1997 to determine if the liquefied natural gas technology is right for them. Two of the six LNG test locomotives are switch, or yard, locomotives. These 1,350 horsepower locomotives are the industry`s first locomotives totally fueled by natural gas. They`re being tested in the yard in the Los Angeles area. The other four locomotives are long-haul locomotives fueled by two tenders. These units are duel-fueled, operating on a mixture of LNG and diesel and are being tested primarily on the Los Angeles to North Platte, Nebraska corridor. All the information concerning locomotive emissions, locomotive performance, maintenance requirements, the overall LNG system design and the economic feasibility of the project will be analyzed to determine if UPR should expand, or abandon, the LNG technology.

  6. A probabilistic risk assessment of the LLNL Plutonium Facility`s evaluation basis fire operational accident. Revision 1

    SciTech Connect

    Brumburgh, G. P.

    1995-02-27

    The Lawrence Livermore National Laboratory (LLNL) Plutonium Facility conducts numerous programmatic activities involving plutonium to include device fabrication, development of improved and/or unique fabrication techniques, metallurgy research, and laser isotope separation. A Safety Analysis Report (SAR) for the building 332 Plutonium Facility was completed in July 1994 to address operational safety and acceptable risk to employees, the public, government property, and the environmental. This paper outlines the PRA analysis of the Evaluation Basis Fire (EBF) operational accident. The EBF postulates the worst-case programmatic impact event for the Plutonium Facility.

  7. 76 FR 78335 - North Carolina & Virginia Railroad Company, LLC, Chesapeake & Albemarle Railroad Division-Lease...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... Surface Transportation Board North Carolina & Virginia Railroad Company, LLC, Chesapeake & Albemarle Railroad Division--Lease Amendment Exemption--Norfolk Southern Railway Company North Carolina & Virginia Railroad, LLC, Chesapeake & Albemarle Railroad Division (NCVR), a Class III carrier, has filed a...

  8. High Performance Computing Facility Operational Assessment, FY 2011 Oak Ridge Leadership Computing Facility

    SciTech Connect

    Baker, Ann E; Bland, Arthur S Buddy; Hack, James J; Barker, Ashley D; Boudwin, Kathlyn J.; Kendall, Ricky A; Messer, Bronson; Rogers, James H; Shipman, Galen M; Wells, Jack C; White, Julia C

    2011-08-01

    Oak Ridge National Laboratory's Leadership Computing Facility (OLCF) continues to deliver the most powerful resources in the U.S. for open science. At 2.33 petaflops peak performance, the Cray XT Jaguar delivered more than 1.5 billion core hours in calendar year (CY) 2010 to researchers around the world for computational simulations relevant to national and energy security; advancing the frontiers of knowledge in physical sciences and areas of biological, medical, environmental, and computer sciences; and providing world-class research facilities for the nation's science enterprise. Scientific achievements by OLCF users range from collaboration with university experimentalists to produce a working supercapacitor that uses atom-thick sheets of carbon materials to finely determining the resolution requirements for simulations of coal gasifiers and their components, thus laying the foundation for development of commercial-scale gasifiers. OLCF users are pushing the boundaries with software applications sustaining more than one petaflop of performance in the quest to illuminate the fundamental nature of electronic devices. Other teams of researchers are working to resolve predictive capabilities of climate models, to refine and validate genome sequencing, and to explore the most fundamental materials in nature - quarks and gluons - and their unique properties. Details of these scientific endeavors - not possible without access to leadership-class computing resources - are detailed in Section 4 of this report and in the INCITE in Review. Effective operations of the OLCF play a key role in the scientific missions and accomplishments of its users. This Operational Assessment Report (OAR) will delineate the policies, procedures, and innovations implemented by the OLCF to continue delivering a petaflop-scale resource for cutting-edge research. The 2010 operational assessment of the OLCF yielded recommendations that have been addressed (Reference Section 1) and where

  9. 49 CFR 1241.11 - Annual reports of class I railroads.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) installation, maintenance, and operation shall be separately identified in a supplement to the Railroad Annual... PTC-related expenditures on road property and equipment improvements, depreciation of road...

  10. 42 CFR 412.405 - Preadmission services as inpatient operating costs under the inpatient psychiatric facility...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... under the inpatient psychiatric facility prospective payment system. 412.405 Section 412.405 Public... Services of Inpatient Psychiatric Facilities § 412.405 Preadmission services as inpatient operating costs under the inpatient psychiatric facility prospective payment system. The prospective payment...

  11. Railroading Powder River style: bigger investments and bigger trains

    SciTech Connect

    Buchsbaum, L.

    2007-07-15

    The Joint Line, co-owned and operated by Union Pacific and Burlington Norfolk Santa Fe (BNSF) railroads, carried a record 354 million tons of coal from Wyoming's Powder River Basin, on 15,000 to 17,000 ton trains. The average haul is almost 1,000 miles. Torrential rainfall and coal dust caused derailment and buckling problems in 2005. The article reports progress in repairing the track and expanding railroad capacity since then. Many are anxious about the railroad's ability to move ever increasing amounts of coal. 3 photos.

  12. Facility Operations 1993 fiscal year work plan: WBS 1.3.1

    SciTech Connect

    Not Available

    1992-11-01

    The Facility Operations program is responsible for the safe, secure, and environmentally sound management of several former defense nuclear production facilities, and for the nuclear materials in those facilities. As the mission for Facility Operations plants has shifted from production to support of environmental restoration, each plant is making a transition to support the new mission. The facilities include: K Basins (N Reactor fuel storage); N Reactor; Plutonium-Uranium Reduction Extraction (PUREX) Plant; Uranium Oxide (UO{sub 3}) Plant; 300 Area Fuels Supply (N Reactor fuel supply); Plutonium Finishing Plant (PFP).

  13. Students Speak With Angela Bauer, Facilities Operations and Maintenance Group Lead

    NASA Video Gallery

    From NASA’s International Space Station Mission Control Center Angela Bauer, Facilities Operations and Maintenance Group lead in the Mission Operations Directorate at Johnson Space Center, partic...

  14. Lunar Transportation Facilities and Operations Study, option 1

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Throughout the Option I period of the Lunar Transportation Facilities and Operations Study (LTFOS), McDonnell Douglas Space Systems Company - Kennedy Space Center (MDSSC-KSC) provided support to both the Planetary Surface Systems (PSS) Office at the National Aeronautics and Space Administration (NASA) at the Johnson Space Center and to the Flight and Ground Systems Projects Office (Payload Projects Management) at the Kennedy Space Center. The primary objective of the Option I phase of the study was to assist the above NASA centers in developing Space Exploration Initiative (SEI) concepts. MDSSC-KSC conducted three analyses which provided launch and landing detail to the proposed exploration concepts. One analysis, the Lunar Ejecta Assessment, was conducted to determine the effects of launch and landing a vehicle in a dusty environment. A second analysis, the Thermal/Micrometeoroid Protection Trade Study, was refined to determine the impacts that Reference Architecture Option 5A would have on thermal/micrometeoroid protection approaches. The third analysis, the Centaur Prelaunch Procedure Analysis, used a Centaur prelaunch test and checkout flow to identify key considerations that would be important if a Lunar Excursion Vehicle (LEV) was to use an expander cycle liquid oxygen-liquid hydrogen engine. Several 'quick look' assessments were also conducted. One quick look assessment, the Storable Propellant Quick Look Assessment, was conducted to identify design considerations that should be made if storable propellants were to be used instead of liquid oxygen and liquid hydrogen. The LEV Servicer Maintenance Analysis provided an early look at the effort required to maintain an LEV Servicer on the lunar surface. Also, support was provided to the PSS Logistics Manager to develop initial LEV Servicer cost inputs. Consideration was given to the advanced development that must be provided to accomplish a lunar and/or Mars mission. MDSS-KSC also provided support to both MASE

  15. Lunar Transportation Facilities and Operations Study, option 1

    NASA Astrophysics Data System (ADS)

    1991-05-01

    Throughout the Option I period of the Lunar Transportation Facilities and Operations Study (LTFOS), McDonnell Douglas Space Systems Company - Kennedy Space Center (MDSSC-KSC) provided support to both the Planetary Surface Systems (PSS) Office at the National Aeronautics and Space Administration (NASA) at the Johnson Space Center and to the Flight and Ground Systems Projects Office (Payload Projects Management) at the Kennedy Space Center. The primary objective of the Option I phase of the study was to assist the above NASA centers in developing Space Exploration Initiative (SEI) concepts. MDSSC-KSC conducted three analyses which provided launch and landing detail to the proposed exploration concepts. One analysis, the Lunar Ejecta Assessment, was conducted to determine the effects of launch and landing a vehicle in a dusty environment. A second analysis, the Thermal/Micrometeoroid Protection Trade Study, was refined to determine the impacts that Reference Architecture Option 5A would have on thermal/micrometeoroid protection approaches. The third analysis, the Centaur Prelaunch Procedure Analysis, used a Centaur prelaunch test and checkout flow to identify key considerations that would be important if a Lunar Excursion Vehicle (LEV) was to use an expander cycle liquid oxygen-liquid hydrogen engine. Several 'quick look' assessments were also conducted. One quick look assessment, the Storable Propellant Quick Look Assessment, was conducted to identify design considerations that should be made if storable propellants were to be used instead of liquid oxygen and liquid hydrogen. The LEV Servicer Maintenance Analysis provided an early look at the effort required to maintain an LEV Servicer on the lunar surface. Also, support was provided to the PSS Logistics Manager to develop initial LEV Servicer cost inputs. Consideration was given to the advanced development that must be provided to accomplish a lunar and/or Mars mission. MDSS-KSC also provided support to both MASE

  16. 9 CFR 354.210 - Minimum standards for sanitation, facilities, and operating procedures in official plants.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Minimum standards for sanitation, facilities, and operating procedures in official plants. 354.210 Section 354.210 Animals and Animal Products... sanitation, facilities, and operating procedures in official plants. The provisions of §§ 354.210 to...

  17. 7 CFR 319.40-8 - Processing at facilities operating under compliance agreements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FOREIGN QUARANTINE NOTICES Logs, Lumber, and Other Unmanufactured Wood Articles § 319.40-8 Processing at facilities operating under compliance agreements. (a) Any person who operates a facility in which imported regulated articles...

  18. Railroad management planning. (Latest citations from the NTIS database). Published Search

    SciTech Connect

    Not Available

    1993-01-01

    The bibliography contains citations concerning railroad management techniques and their impact on operations. Topics include freight statistics, impacts on communities, and yard operations. Forecasts of future trends and government policies regarding railroad operations are also discussed. (Contains a minimum of 76 citations and includes a subject term index and title list.)

  19. Battery test facility hardware, software, and system operation

    SciTech Connect

    Rodriguez, G.P.

    1991-09-01

    Division 2525 Battery Test Laboratory is a fully automated battery testing facility used in evaluating various battery technologies. The results of these tests are used to verify developers` claims, characterize prototypes, and assist in identifying the strengths and weaknesses of each technology. The Test Facility consists of a central computer and nine remote computer controlled battery test systems. Data acquired during the battery testing process is sent to the central computer system. The test data is then stored in a large database for future analysis. The central computer system is also used in configuring battery tests. These test configurations are then sent to their appropriate remote battery test sites. The Battery Test Facility can perform a variety of battery tests, which include the following: Life Cycle Testing; Parametric Testing at various temperature levels, cutoff parameters, charge rates, and discharge rates; Constant Power Testing at various power levels; Peak Power Testing at various State-of-Charge levels; Simplified Federal Urban Driving Schedule Tests (SFUDS79). The Battery Test Facility is capable of charging a battery either by constant current, constant voltage, step current levels, or any combination of them. Discharge cycles can be by constant current, constant resistance, constant power, step current levels, or also any combination of them. The Battery Test Facility has been configured to provide the flexibility to evaluate a large variety of battery technologies. These technologies include Lead-Acid, Sodium/Sulfur, Zinc/Bromine, Nickel/Hydrogen, Aluminum/Air, and Nickel/Cadmium batteries.

  20. Battery test facility hardware, software, and system operation

    SciTech Connect

    Rodriguez, G.P.

    1991-09-01

    Division 2525 Battery Test Laboratory is a fully automated battery testing facility used in evaluating various battery technologies. The results of these tests are used to verify developers' claims, characterize prototypes, and assist in identifying the strengths and weaknesses of each technology. The Test Facility consists of a central computer and nine remote computer controlled battery test systems. Data acquired during the battery testing process is sent to the central computer system. The test data is then stored in a large database for future analysis. The central computer system is also used in configuring battery tests. These test configurations are then sent to their appropriate remote battery test sites. The Battery Test Facility can perform a variety of battery tests, which include the following: Life Cycle Testing; Parametric Testing at various temperature levels, cutoff parameters, charge rates, and discharge rates; Constant Power Testing at various power levels; Peak Power Testing at various State-of-Charge levels; Simplified Federal Urban Driving Schedule Tests (SFUDS79). The Battery Test Facility is capable of charging a battery either by constant current, constant voltage, step current levels, or any combination of them. Discharge cycles can be by constant current, constant resistance, constant power, step current levels, or also any combination of them. The Battery Test Facility has been configured to provide the flexibility to evaluate a large variety of battery technologies. These technologies include Lead-Acid, Sodium/Sulfur, Zinc/Bromine, Nickel/Hydrogen, Aluminum/Air, and Nickel/Cadmium batteries.

  1. Battery test facility hardware, software, and system operation

    NASA Astrophysics Data System (ADS)

    Rodriguez, G. P.

    1991-09-01

    Division 2525 Battery Test Laboratory is a fully automated battery testing facility used in evaluating various battery technologies. The results of these tests are used to verify developers' claims, characterize prototypes, and assist in identifying the strengths and weaknesses of each technology. The test facility consists of a central computer and nine remote computer controlled battery test systems. Data acquired during the battery testing process is sent to the central computer system. The test data is then stored in a large database for future analysis. The central computer system is also used in configuring battery tests. These test configurations are then sent to their appropriate remote battery test sites. The battery test facility can perform a variety of battery tests, which include the following: life cycle testing; parametric testing at various temperature levels, cutoff parameters, charge rates, and discharge rates; constant power testing at various power levels; peak power testing at various state-of-charge levels; simplified federal urban driving schedule tests (SFUDS79). The battery test facility is capable of charging a battery either by constant current, constant voltage, step current levels, or any combination of them. Discharge cycles can be by constant current, constant resistance, constant power, step current levels, or also any combination of them. The battery test facility has been configured to provide the flexibility to evaluate a large variety of battery technologies. These technologies include lead-acid, sodium/sulfur, zinc/bromine, nickel/hydrogen, aluminum/air, and nickel/cadmium batteries.

  2. High Performance Computing Facility Operational Assessment, FY 2010 Oak Ridge Leadership Computing Facility

    SciTech Connect

    Bland, Arthur S Buddy; Hack, James J; Baker, Ann E; Barker, Ashley D; Boudwin, Kathlyn J.; Kendall, Ricky A; Messer, Bronson; Rogers, James H; Shipman, Galen M; White, Julia C

    2010-08-01

    Oak Ridge National Laboratory's (ORNL's) Cray XT5 supercomputer, Jaguar, kicked off the era of petascale scientific computing in 2008 with applications that sustained more than a thousand trillion floating point calculations per second - or 1 petaflop. Jaguar continues to grow even more powerful as it helps researchers broaden the boundaries of knowledge in virtually every domain of computational science, including weather and climate, nuclear energy, geosciences, combustion, bioenergy, fusion, and materials science. Their insights promise to broaden our knowledge in areas that are vitally important to the Department of Energy (DOE) and the nation as a whole, particularly energy assurance and climate change. The science of the 21st century, however, will demand further revolutions in computing, supercomputers capable of a million trillion calculations a second - 1 exaflop - and beyond. These systems will allow investigators to continue attacking global challenges through modeling and simulation and to unravel longstanding scientific questions. Creating such systems will also require new approaches to daunting challenges. High-performance systems of the future will need to be codesigned for scientific and engineering applications with best-in-class communications networks and data-management infrastructures and teams of skilled researchers able to take full advantage of these new resources. The Oak Ridge Leadership Computing Facility (OLCF) provides the nation's most powerful open resource for capability computing, with a sustainable path that will maintain and extend national leadership for DOE's Office of Science (SC). The OLCF has engaged a world-class team to support petascale science and to take a dramatic step forward, fielding new capabilities for high-end science. This report highlights the successful delivery and operation of a petascale system and shows how the OLCF fosters application development teams, developing cutting-edge tools and resources for next

  3. The operation of the Tokamak Fusion Test Reactor Tritium Facility

    SciTech Connect

    Gentile, C.A.; LaMarche, P.H.; Anderson, J.L.

    1995-07-01

    The TFTR tritium operations staff has successfully received, stored, handled, and processed over five hundred thousand curies of tritium for the purpose of supporting D-T (Deuterium-Tritium) operations at TFTR. Tritium operations personnel nominally provide continuous round the clock coverage (24 hours/day, 7 days/week) in shift complements consisting of I supervisor and 3 operators. Tritium Shift Supervisors and operators are required to have 5 years of operational experience in either the nuclear or chemical industry and to become certified for their positions. The certification program provides formal instruction, as well as on the job training. The certification process requires 4 to 6 months to complete, which includes an oral board lasting up to 4 hours at which time the candidate is tested on their knowledge of Tritium Technology and TFTR Tritium systems. Once an operator is certified, the training process continues with scheduled training weeks occurring once every 5 weeks. During D-T operations at TFTR the operators must evacuate the tritium area due to direct radiation from TFTR D-T pulses. During `` time operators maintain cognizance over tritium systems via a real time TV camera system. Operators are able to gain access to the Tritium area between TFTR D-T pulses, but have been excluded from die tritium area during D-T pulsing for periods up to 30 minutes. Tritium operators are responsible for delivering tritium gas to TFRR as well as processing plasma exhaust gases which lead to the deposition of tritium oxide on disposable molecular sieve beds (DMSB). Once a DMSB is loaded, the operations staff remove the expended DMSB, and replace it with a new DMSB container. The TFIR tritium system is operated via detailed procedures which require operator sign off for system manipulation. There are >300 procedures controlling the operation of the tritium systems.

  4. 76 FR 56873 - American Railroad Group Transportation Services, LLC d/b/a ARG Trans-Continuance in Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-14

    ... Surface Transportation Board American Railroad Group Transportation Services, LLC d/b/a ARG Trans--Continuance in Control Exemption--Coos Bay Railroad Operating Company, LLC d/b/a Coos Bay Rail Link American Railroad Group Transportation Services, LLC d/b/a ARG Trans (ARG Trans), a noncarrier, has filed a...

  5. 76 FR 13272 - Columbia & Cowlitz Railway, LLC-Corporate Family Transaction Exemption-Patriot Woods Railroad, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-10

    ... Surface Transportation Board Columbia & Cowlitz Railway, LLC--Corporate Family Transaction Exemption--Patriot Woods Railroad, LLC Columbia & Cowlitz Railway, LLC (CLC) and Patriot Woods Railroad, LLC (Woods... corporate family. CLC seeks to lease and operate all of Woods' lines of railroad consisting of...

  6. 76 FR 24561 - Railroad Safety Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-02

    ... advisory committee that develops railroad safety regulations through a consensus process. The RSAC meeting... Federal Railroad Administration Railroad Safety Advisory Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of Railroad...

  7. 77 FR 73734 - Railroad Safety Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ... Advisory Committee that develops railroad safety regulations through a consensus process. The RSAC meeting... Federal Railroad Administration Railroad Safety Advisory Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of Railroad...

  8. 77 FR 52393 - Railroad Safety Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-29

    ... Advisory Committee that develops railroad safety regulations through a consensus process. The RSAC meeting... Federal Railroad Administration Railroad Safety Advisory Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of Railroad...

  9. 75 FR 44046 - Railroad Safety Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-27

    ... advisory committee that develops railroad safety regulations through a consensus process. The RSAC meeting... Federal Railroad Administration Railroad Safety Advisory Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of Railroad...

  10. 78 FR 26423 - Railroad Safety Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... Advisory Committee that develops railroad safety regulations through a consensus process. The RSAC meeting... Federal Railroad Administration Railroad Safety Advisory Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of Railroad...

  11. Fire protection considerations for the design and operation of liquefied petroleum gas (LPG) storage facilities

    SciTech Connect

    Not Available

    1989-01-01

    This standard addresses the design, operation, and maintenance of LPG storage facilities from the standpoint of prevention and control of releases, fire-protection design, and fire-control measures, as well as the history of LPG storage facility failure, facility design philosophy, operating and maintenance procedures, and various fire-protection and firefighting approaches and presentations. The storage facilities covered are LPG installations (storage vessels and associated loading/unloading/transfer systems) at marine and pipeline terminals, natural gas processing plants, refineries, petrochemical plants, and tank farms.

  12. Waste Examination Assay Facility operations: TRU waste certification

    SciTech Connect

    Schultz, F.J.; Caylor, B.A.; Coffey, D.E.; Phoenix, L.B.

    1987-01-01

    The ORNL Waste Examination Assay Facility (WEAF) was established to nondestructively assay (NDA) transuranic (TRU) waste generated at Oak Ridge National Laboratory (ORNL). The present facility charter encompasses the NDA and nondestructive examination (NDE) of both TRU and low-level wastes (LLW). Presently, equipment includes a Neutron Assay System (NAS), a Segmented Gamma Scanner (SGS), a drum-sized Real-Time Radiography (RTR) system, and a Neutron Slab Detector (NSD). The first three instruments are computer interfaced. Approximately 2300 TRU waste drums have been assayed with the NAS and the SGS. Another 3000 TRU and LLW drums have been examined with the RTR unit. Computer data bases have been developed to collate the large amount of data generated during the assays and examinations. 6 refs., 1 tab.

  13. The potential for LNG as a railroad fuel in the U.S.

    SciTech Connect

    Fritz, S.G.

    2000-01-01

    Freight railroad operations in the US represent a substantial opportunity for liquefied natural gas (LNG) to displace diesel fuel. With the promise of achieving an overwhelming economic advantage over diesel fuel, this paper presents some discussion to the question, ``Why is the application of LNG for railroad use in the US moving so slowly?'' A brief overview of the freight railroad operations in the US is given, along with a summary of several railroad LNG demonstration projects. US Environmental Protection Agency and California Air Resources Board exhaust emission regulations may cause the railroad industry to move from small-scale LNG demonstration projects to using LNG as a primary freight railroad transportation fuel in selected regions or route-specific applications.

  14. Operating experience with ABB Power Plant Laboratories multi-use combustion test facility

    SciTech Connect

    Jukkola, G.; Levasseur, A.; Mylchreest, D.; Turek, D.

    1999-07-01

    Combustion Engineering, Inc.'s ABB Power Plant Laboratories (PPL) has installed a new Multi-Use Combustion Test Facility to support the product development needs for ABB Group's Power Generation Businesses. This facility provides the flexibility to perform testing under fluidized bed combustion, conventional pulverized-coal firing, and gasification firing conditions, thus addressing the requirements for several test facilities. Initial operation of the facility began in late 1997. This paper will focus on the design and application of this Multi-Use Combustion Test Facility for fluidized bed product development. In addition, this paper will present experimental facility results from initial circulating fluidized bed operation, including combustion and environmental performance, heat transfer, and combustor profiles.

  15. Operator-machine interface at a large laser-fusion facility

    SciTech Connect

    Sutton, J.G.; Howell, J.A.

    1982-01-01

    The operator-machine interface at the Antares Laser Facility provides the operator with a means of controlling the laser system and obtaining operational and performance information. The goal of this interface is to provide an operator with access to the control system in a comfortable way, and to facilitate meeting operational requirements. We describe the philosophy and requirements behind this interface, the hardware used in building it, and the software environment.

  16. 3. NORTH ELEVATION OF THE HOT BAY, SHOWING RAILROAD TRACKS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. NORTH ELEVATION OF THE HOT BAY, SHOWING RAILROAD TRACKS LEADING TO THE MASSIVE STEEL-LINED CONCRETE ENTRANCE DOOR. PART OF THE INTRICATE HVAC SYSTEM IS WEST (RIGHT) OF THE DOOR. - Nevada Test Site, Engine Maintenance Assembly & Disassembly Facility, Area 25, Jackass Flats, Mercury, Nye County, NV

  17. Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant

    SciTech Connect

    Norm Stanley

    2011-02-01

    This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

  18. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., Infrastructure, and Equipment for Military Operations. 252.246-7004 Section 252.246-7004 Federal Acquisition..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause: SAFETY OF FACILITIES, INFRASTRUCTURE, AND EQUIPMENT FOR MILITARY OPERATIONS (OCT 2010) (a)...

  19. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., Infrastructure, and Equipment for Military Operations. 252.246-7004 Section 252.246-7004 Federal Acquisition..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause: Safety of Facilities, Infrastructure, and Equipment for Military Operations (OCT 2010) (a)...

  20. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., Infrastructure, and Equipment for Military Operations. 252.246-7004 Section 252.246-7004 Federal Acquisition..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause: Safety of Facilities, Infrastructure, and Equipment for Military Operations (OCT 2010) (a)...

  1. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., Infrastructure, and Equipment for Military Operations. 252.246-7004 Section 252.246-7004 Federal Acquisition..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause: Safety of Facilities, Infrastructure, and Equipment for Military Operations (OCT 2010) (a)...

  2. Coming of the Railroad, Unit V.

    ERIC Educational Resources Information Center

    Robinson, Terry

    Designed for elementary school students, this unit on the coming of the railroad in Wyoming provides concepts, activities, resource lists, and maps. Concepts stress the coming of the railroad in 1867-69, routes which were considered, towns owing their origin to the railroad, the railroad ownership of southern Wyoming, and the relationship between…

  3. 48 CFR 246.270 - Safety of facilities, infrastructure, and equipment for military operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Safety of facilities, infrastructure, and equipment for military operations. 246.270 Section 246.270 Federal Acquisition Regulations... ASSURANCE Contract Quality Requirements 246.270 Safety of facilities, infrastructure, and equipment...

  4. 48 CFR 246.270 - Safety of facilities, infrastructure, and equipment for military operations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Safety of facilities, infrastructure, and equipment for military operations. 246.270 Section 246.270 Federal Acquisition Regulations... ASSURANCE Contract Quality Requirements 246.270 Safety of facilities, infrastructure, and equipment...

  5. 48 CFR 246.270 - Safety of facilities, infrastructure, and equipment for military operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Safety of facilities, infrastructure, and equipment for military operations. 246.270 Section 246.270 Federal Acquisition Regulations... ASSURANCE Contract Quality Requirements 246.270 Safety of facilities, infrastructure, and equipment...

  6. 48 CFR 246.270 - Safety of facilities, infrastructure, and equipment for military operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Safety of facilities, infrastructure, and equipment for military operations. 246.270 Section 246.270 Federal Acquisition Regulations... ASSURANCE Contract Quality Requirements 246.270 Safety of facilities, infrastructure, and equipment...

  7. 14 CFR 121.609 - Communication and navigation facilities: Supplemental operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Communication and navigation facilities... Flight Release Rules § 121.609 Communication and navigation facilities: Supplemental operations. No person may release an aircraft over any route or route segment unless communication and...

  8. 14 CFR 121.609 - Communication and navigation facilities: Supplemental operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Communication and navigation facilities... Flight Release Rules § 121.609 Communication and navigation facilities: Supplemental operations. No person may release an aircraft over any route or route segment unless communication and...

  9. 14 CFR 121.609 - Communication and navigation facilities: Supplemental operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Communication and navigation facilities... Flight Release Rules § 121.609 Communication and navigation facilities: Supplemental operations. No person may release an aircraft over any route or route segment unless communication and...

  10. 14 CFR 121.609 - Communication and navigation facilities: Supplemental operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Communication and navigation facilities... Flight Release Rules § 121.609 Communication and navigation facilities: Supplemental operations. No person may release an aircraft over any route or route segment unless communication and...

  11. 14 CFR 121.609 - Communication and navigation facilities: Supplemental operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Communication and navigation facilities... Flight Release Rules § 121.609 Communication and navigation facilities: Supplemental operations. No person may release an aircraft over any route or route segment unless communication and...

  12. Higher Education Facilities Commissions: A Self-Study of Operational Patterns and State Plan Criteria.

    ERIC Educational Resources Information Center

    National Association of Executive Directors of Higher Education Facilities Commissions. Committee on Administration and State Plans.

    This document investigates operational patterns and state plan criteria of the Higher Education Facilities Commission. Four study procedures were delineated: (1) development of a list of common responsibilities inherent for state facilities commissions in related federal legislation, (2) development of a calendar of important date related to the…

  13. 40 CFR 121.26 - Inspection of facility or activity before operation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Inspection of facility or activity... (CONTINUED) WATER PROGRAMS STATE CERTIFICATION OF ACTIVITIES REQUIRING A FEDERAL LICENSE OR PERMIT Certification by the Administrator § 121.26 Inspection of facility or activity before operation. Where...

  14. 40 CFR 121.26 - Inspection of facility or activity before operation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Inspection of facility or activity... (CONTINUED) WATER PROGRAMS STATE CERTIFICATION OF ACTIVITIES REQUIRING A FEDERAL LICENSE OR PERMIT Certification by the Administrator § 121.26 Inspection of facility or activity before operation. Where...

  15. 40 CFR 121.26 - Inspection of facility or activity before operation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Inspection of facility or activity... (CONTINUED) WATER PROGRAMS STATE CERTIFICATION OF ACTIVITIES REQUIRING A FEDERAL LICENSE OR PERMIT Certification by the Administrator § 121.26 Inspection of facility or activity before operation. Where...

  16. 40 CFR 121.26 - Inspection of facility or activity before operation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Inspection of facility or activity... (CONTINUED) WATER PROGRAMS STATE CERTIFICATION OF ACTIVITIES REQUIRING A FEDERAL LICENSE OR PERMIT Certification by the Administrator § 121.26 Inspection of facility or activity before operation. Where...

  17. 40 CFR 121.26 - Inspection of facility or activity before operation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Inspection of facility or activity... (CONTINUED) WATER PROGRAMS STATE CERTIFICATION OF ACTIVITIES REQUIRING A FEDERAL LICENSE OR PERMIT Certification by the Administrator § 121.26 Inspection of facility or activity before operation. Where...

  18. 77 FR 72430 - Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-05

    ... Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border of the United... Presidential Permit to Operate and Maintain Pipeline Facilities on the Border of the United States and Canada... at the U.S.- Canada border (St. Clair Pipeline border facilities). The pipeline facilities...

  19. Microbiology operations and facilities aboard restructured Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Cioletti, Louis A.; Mishra, S. K.; Pierson, Duane L.

    1992-01-01

    With the restructure and funding changes for Space Station Freedom, the Environmental Health System (EHS)/Microbiology Subsystem revised its scheduling and operational requirements for component hardware. The function of the Microbiology Subsystem is to monitor the environmental quality of air, water, and internal surfaces and, in part, crew health on board Space Station. Its critical role shall be the identification of microbial contaminants in the environment that may cause system degradation, produce unsanitary or pathogenic conditions, or reduce crew and mission effectiveness. EHS/Microbiology operations and equipment shall be introduced in concert with a phased assembly sequence, from Man Tended Capability (MTC) through Permanently Manned Capability (PMC). Effective Microbiology operations and subsystem components will assure a safe, habitable, and useful spacecraft environment for life sciences research and long-term manned exploration.

  20. Operational experience from a large EPICS-based accelerator facility

    SciTech Connect

    Ciarlette, D.J.; Gerig, R.

    1995-12-31

    The Advanced Photon Source (APS) at Argonne National Laboratory is a third-generation x-ray light source which uses the Experimental Physics and Industrial Control System (EPICS) to operate its linear accelerator, positron accumulator ring, booster synchrotron, and storage ring equipment. EPICS has been used at the APS since the beginning of installation and commissioning. Currently, EPICS controls approximately 100 VME crates containing over 100,000 process variables. With this complexity, the APS has had to review some of the methods originally employed and make changes as necessary. In addition, due to commissioning and operational needs, higher-level operator software needed to be created. EPICS has been flexible enough to allow this.

  1. 75 FR 61835 - Jackson & Lansing Railroad Company-Trackage Rights Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ... Surface Transportation Board Jackson & Lansing Railroad Company--Trackage Rights Exemption-- Norfolk Southern Railway Company Pursuant to a written Assignment of Trackage Rights and Other Joint Facility Agreements (Trackage Agreement) dated September 16, 2010, Norfolk Southern Railway Company (NSR) has...

  2. 75 FR 33365 - Entergy Nuclear Operations, Inc.; Notice of Withdrawal of Application for Amendment to Facility...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... the Federal Register on November 4, 2008 (73 FR 65691). However, by letter dated May 6, 2010, the... amendment to Facility Operating License No. DPR-20 for the Palisades Nuclear Plant, located in Van...

  3. Spent Nuclear Fuel (SNF) Cold Vacuum Drying (CVD) Facility Operations Manual

    SciTech Connect

    IRWIN, J.J.

    1999-07-02

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-553, Spent Nuclear Fuel Project Final Safety Analysis Report Annex B--Cold Vacuum Drying Facility. The HNF-SD-SNF-DRD-002, 1999, Cold Vacuum Drying Facility Design Requirements, Rev. 4, and the CVDF Final Design Report. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence and references to the CVDF System Design Descriptions (SDDs). This manual has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

  4. Spent Nuclear Fuel (SNF) Project Cold Vacuum Drying (CVD) Facility Operations Manual

    SciTech Connect

    IRWIN, J.J.

    2000-02-03

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of the Processing Systems (Garvin 1998) and, the HNF-SD-SNF-DRD-002, 1997, Cold Vacuum Drying Facility Design Requirements, Rev. 3a. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence, and has been developed for the spent nuclear fuel project (SNFP) Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

  5. 41 CFR 102-74.70 - Are commercial vendors and nonprofit organizations required to operate vending facilities by...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and nonprofit organizations required to operate vending facilities by permit or contractual... Management Concession Services § 102-74.70 Are commercial vendors and nonprofit organizations required to operate vending facilities by permit or contractual arrangement? Commercial vendors and...

  6. 40 CFR 265.31 - Maintenance and operation of facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water which could threaten human health or the -environment....

  7. 40 CFR 265.31 - Maintenance and operation of facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water which could threaten human health or the -environment....

  8. 40 CFR 265.31 - Maintenance and operation of facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water which could threaten human health or the -environment....

  9. Educational Systems for Operators of Water Pollution Control Facilities.

    ERIC Educational Resources Information Center

    Austin, John H., Ed.; Kesler, John, Ed.

    Several of the articles from this conference concern current activities of federal, state, and municipal governments, of universities and community colleges, and of industry in wastewater treatment plant operator training. The rest of the articles deal with instructional technology, explaining different facets of it and showing how it may be…

  10. Maintenance & Operations Solutions: Meeting the Challenge of Improving School Facilities.

    ERIC Educational Resources Information Center

    Association of School Business Officials International, Reston, VA.

    This paper examines the impact current maintenance and operations (M&O) practices have on U.S. school performance and offers possible opportunities for improvement through the judicious use of technology and methodology. The paper also presents a regional comparative analysis of M&O costs across the country. A list of equipment and their service…

  11. 40 CFR 265.31 - Maintenance and operation of facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water which could threaten human health or the -environment....

  12. Simulation Modeling of a Facility Layout in Operations Management Classes

    ERIC Educational Resources Information Center

    Yazici, Hulya Julie

    2006-01-01

    Teaching quantitative courses can be challenging. Similarly, layout modeling and lean production concepts can be difficult to grasp in an introductory OM (operations management) class. This article describes a simulation model developed in PROMODEL to facilitate the learning of layout modeling and lean manufacturing. Simulation allows for the…

  13. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... being conducted and equipment being used. (b) A route shall be established to allow employees to pass to and from places of employment without passing under, over or through railcars, or between cars less... movement, employees shall stand clear of the hauling rope and shall not stand between the rope and the...

  14. Facility Safety Plan B360 Complex Biohazardous Operations CMLS-412r0

    SciTech Connect

    Cooper, G

    2007-01-08

    This Addendum to the Facility Safety Plan (FSP) 360 Complex describes the safety requirements for the safe conduct of all biohazardous research operations in all buildings within the 360 complex program areas. These requirements include all the responsibilities and authorities of building personnel, operational hazards, and environmental concerns and their controls. In addition, this Addendum prescribes facility-specific training requirements and emergency controls, as well as maintenance and quality assurance requirements for ES&H-related building systems.

  15. Design data package and operating procedures for MSFC solar simulator test facility

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Design and operational data for the solar simulator test facility are reviewed. The primary goal of the facility is to evaluate the performance capacibility and worst case failure modes of collectors, which utilize either air or liquid transport media. The facility simulates environmental parameters such as solar radiation intensity, solar spectrum, collimation, uniformity, and solar attitude. The facility also simulates wind conditions of velocity and direction, solar system conditions imposed on the collector, collector fluid inlet temperature, and geometric factors of collector tilt and azimuth angles. Testing the simulator provides collector efficiency data, collector time constant, incident angle modifier data, and stagnation temperature values.

  16. 49 CFR 1242.32 - Joint facility rents-debit and credit and joint facility-debit and credit (accounts 33-17-00, 33...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Joint facility rents-debit and credit and joint facility-debit and credit (accounts 33-17-00, 33-18-00, 33-19-00, 34-17-00, 34-18-00, 34-19-00, 37-17-00... PASSENGER SERVICE FOR RAILROADS 1 Operating Expenses-Way and Structures § 1242.32 Joint facility...

  17. Railroad Valley, Nevada

    NASA Technical Reports Server (NTRS)

    2001-01-01

    Information from images of Railroad Valley, Nevada captured on August 17,2001 by the Advanced Spaceborne Thermal Emission and Reflection Radiometer(ASTER) may provide a powerful tool for monitoring crop health and maintenance procedures.

    These images cover an area of north central Nevada. The top image shows irrigated fields, with healthy vegetation in red. The middle image highlights the amount of vegetation. The color code shows highest vegetation content in red, orange, yellow, green, blue, and purple and the lowest in black. The final image is a thermal infrared channel, with warmer temperatures in white and colder in black.

    In the thermal image, the northernmost and westernmost fields are markedly colder on their northwest areas, even though no differences are seen in the visible image or the second, Vegetation Index image. This can be attributed to the presence of excess water, which can lead to crop damage.

    The Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER)is an imaging instrument that is flying on Terra, a satellite launched in December 1999 as part of NASA's Earth Observing System (EOS). The instrument is being used to obtain detailed maps of land surface temperature, emissivity, reflectance and elevation. The Earth Observing System (EOS) platforms are part of NASA's Earth Science Enterprise, whose goal is to obtain a better understanding of the interactions between the biosphere, hydrosphere, lithosphere and atmosphere.

    NASA's Jet Propulsion Laboratory is a division of the California Institute of Technology, Pasadena.

  18. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    SciTech Connect

    Not Available

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs.

  19. Experiments in hand-operated, hypersonic shock tunnel facility

    NASA Astrophysics Data System (ADS)

    Sudhiesh Kumar, Chintoo; Reddy, K. P. J.

    2015-12-01

    Experiments were conducted using the newly developed table-top, hand-operated hypersonic shock tunnel, otherwise known as the Reddy hypersonic shock tunnel. This novel instrument uses only manual force to generate the shock wave in the shock tube, and is designed to generate a freestream flow of Mach 6.5 in the test section. The flow was characterized using stagnation point pressure measurements made using fast-acting piezoelectric transducers. Schlieren visualization was also carried out to capture the bow shock in front of a hemispherical body placed in the flow. Freestream Mach numbers estimated at various points in the test section showed that for a minimum diameter of 46 mm within the test section, the value did not vary by more than 3 % along any cross-sectional plane. The results of the experiments presented here indicate that the device may be successfully employed for basic hypersonic research activities at the university level.

  20. 49 CFR 1242.81 - Joint facility-debit and credit (accounts 37-55-00 and 38-55-00).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Joint facility-debit and credit (accounts 37-55-00... RAILROADS 1 Operating Expenses-Transportation § 1242.81 Joint facility—debit and credit (accounts 37-55-00... according to the use made of each facility by the reporting carriers, regardless of the use made of...

  1. 49 CFR 1242.71 - Joint facility-debit and credit (accounts 37-52-00 and 38-52-00).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Joint facility-debit and credit (accounts 37-52-00... RAILROADS 1 Operating Expenses-Transportation § 1242.71 Joint facility—debit and credit (accounts 37-52-00... assigned according to the use made of each facility by the reporting carriers, regardless of the use...

  2. 49 CFR 1242.64 - Joint facility-debit and credit (accounts 37-51-00 and 38-51-00).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Joint facility-debit and credit (accounts 37-51-00... RAILROADS 1 Operating Expenses-Transportation § 1242.64 Joint facility—debit and credit (accounts 37-51-00... assigned according to the use made of each facility by the reporting carrier, regardless of the use made...

  3. The Mixed Waste Management Facility. Design basis integrated operations plan (Title I design)

    SciTech Connect

    1994-12-01

    The Mixed Waste Management Facility (MWMF) will be a fully integrated, pilotscale facility for the demonstration of low-level, organic-matrix mixed waste treatment technologies. It will provide the bridge from bench-scale demonstrated technologies to the deployment and operation of full-scale treatment facilities. The MWMF is a key element in reducing the risk in deployment of effective and environmentally acceptable treatment processes for organic mixed-waste streams. The MWMF will provide the engineering test data, formal evaluation, and operating experience that will be required for these demonstration systems to become accepted by EPA and deployable in waste treatment facilities. The deployment will also demonstrate how to approach the permitting process with the regulatory agencies and how to operate and maintain the processes in a safe manner. This document describes, at a high level, how the facility will be designed and operated to achieve this mission. It frequently refers the reader to additional documentation that provides more detail in specific areas. Effective evaluation of a technology consists of a variety of informal and formal demonstrations involving individual technology systems or subsystems, integrated technology system combinations, or complete integrated treatment trains. Informal demonstrations will typically be used to gather general operating information and to establish a basis for development of formal demonstration plans. Formal demonstrations consist of a specific series of tests that are used to rigorously demonstrate the operation or performance of a specific system configuration.

  4. Operation of N Reactor and Fuels Fabrication Facilities, Hanford Reservation, Richland, Benton County, Washington: Environmental assessment

    SciTech Connect

    Not Available

    1980-08-01

    Environmental data, calculations and analyses show no significant adverse radiological or nonradiological impacts from current or projected future operations resulting from N Reactor, Fuels Fabrication and Spent Fuel Storage Facilities. Nonoccupational radiation exposures resulting from 1978 N Reactor operations are summarized and compared to allowable exposure limits.

  5. 43 CFR 3275.11 - What are a facility operator's obligations?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false What are a facility operator's obligations? 3275.11 Section 3275.11 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Conducting Utilization Operations §...

  6. 43 CFR 3275.11 - What are a facility operator's obligations?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false What are a facility operator's obligations? 3275.11 Section 3275.11 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Conducting Utilization Operations §...

  7. 43 CFR 3275.11 - What are a facility operator's obligations?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false What are a facility operator's obligations? 3275.11 Section 3275.11 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Conducting Utilization Operations §...

  8. Facility Management Child Care Resource Book. Child Care Operations Center of Expertise.

    ERIC Educational Resources Information Center

    General Services Administration, Washington, DC. Public Buildings Service.

    This guidebook provides maintenance and operations guidelines for managing General Services Administration (GSA) child care centers within the same standards and level of a GSA operated facility. Areas covered address cleaning standards and guidelines; equipment funding and inventory; maintenance of living environments and problem areas;…

  9. Operating experience review - Ventilation systems at Department of Energy Facilities

    SciTech Connect

    Not Available

    1994-05-01

    The Office of Special Projects (DP-35), formerly Office of Self-Assessment (DP-9), analyzed occurrences caused by problems with equipment and material and recommended the following systems for an in-depth study: (1) Selective Alpha Air Monitor (SAAM), (2) Emergency Diesel Generator, (3) Ventilation System, (4) Fire Alarm System. Further, DP-35 conducted an in-depth review of the problems associated with SAAM and with diesel generators, and made several recommendations. This study focusses on ventilation system. The intent was to determine the causes for the events related to these system that were reported in the Occurrence Reporting and Processing System (ORPS), to identify components that failed, and to provide technical information from the commercial and nuclear industries on the design, operation, maintenance, and surveillance related to the system and its components. From these data, sites can develop a comprehensive program of maintenance management, including surveillance, to avoid similar occurrences, and to be in compliance with the following DOE orders.

  10. High Performance Computing Facility Operational Assessment, CY 2011 Oak Ridge Leadership Computing Facility

    SciTech Connect

    Baker, Ann E; Barker, Ashley D; Bland, Arthur S Buddy; Boudwin, Kathlyn J.; Hack, James J; Kendall, Ricky A; Messer, Bronson; Rogers, James H; Shipman, Galen M; Wells, Jack C; White, Julia C; Hudson, Douglas L

    2012-02-01

    Oak Ridge National Laboratory's Leadership Computing Facility (OLCF) continues to deliver the most powerful resources in the U.S. for open science. At 2.33 petaflops peak performance, the Cray XT Jaguar delivered more than 1.4 billion core hours in calendar year (CY) 2011 to researchers around the world for computational simulations relevant to national and energy security; advancing the frontiers of knowledge in physical sciences and areas of biological, medical, environmental, and computer sciences; and providing world-class research facilities for the nation's science enterprise. Users reported more than 670 publications this year arising from their use of OLCF resources. Of these we report the 300 in this review that are consistent with guidance provided. Scientific achievements by OLCF users cut across all range scales from atomic to molecular to large-scale structures. At the atomic scale, researchers discovered that the anomalously long half-life of Carbon-14 can be explained by calculating, for the first time, the very complex three-body interactions between all the neutrons and protons in the nucleus. At the molecular scale, researchers combined experimental results from LBL's light source and simulations on Jaguar to discover how DNA replication continues past a damaged site so a mutation can be repaired later. Other researchers combined experimental results from ORNL's Spallation Neutron Source and simulations on Jaguar to reveal the molecular structure of ligno-cellulosic material used in bioethanol production. This year, Jaguar has been used to do billion-cell CFD calculations to develop shock wave compression turbo machinery as a means to meet DOE goals for reducing carbon sequestration costs. General Electric used Jaguar to calculate the unsteady flow through turbo machinery to learn what efficiencies the traditional steady flow assumption is hiding from designers. Even a 1% improvement in turbine design can save the nation billions of gallons of

  11. Pre-operational environmental monitoring plan for the Device Assembly Facility at the Nevada Test Site

    SciTech Connect

    Ferate, F.D.

    1995-01-01

    Nuclear explosives operations have been and may continue to be an important component of the DOE mission at the NTS. This mission has been to conduct the nation`s nuclear testing program in a safe, secure, and efficient manner while assuring full compliance with state and federal regulations, and DOE order`s and directives. These operations have generally included assembly, disassembly or modification, staging, transportation, and tesbng of nuclear explosive devices. They may also include maintenance, repair, retrofit, and surveillance. The Device Assembly Facility (DAF) was constructed to provide a dedicated facility in which to prepare nuclear explosives assemblies for their intended disposition. This facility will provide for combined operations (replacing two separate facilities) and incorporates state-of-the-art safety and security features while minimizing the risks of environmental impacts. The facility has been completed but not yet operated, so the impacts to be considered will b e based on normal operations and not on the impacts of construction activities. The impacts will arise from nuclear explosives operations that require the handling of high explosives in combination with special nuclear materials. Wastes from operation of the earlier device assembly facilities have included grams of epoxies, pints of solvents, and small quantities of waste explosives. These are hazardous (includes radioactive) wastes and are disposed of in accordance with state and federal regulations. Assuming similar operations at the DAF, non-hazardous (includes non-radioactive) solid waste would be transported to a permitted landfill. Waste explosives would be sent to the Area 11 Explosive Ordnance Disposal Unit. Other hazardous waste would be sent to the Area 5 Radioactive Waste.Management Site for shipment or burial.

  12. 49 CFR 222.5 - What railroads does this regulation apply to?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... per hour over public highway-rail grade crossings; and (c) Rapid transit operations within an urban area that are not connected to the general railroad system of transportation. See 49 CFR part 209... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION USE OF LOCOMOTIVE HORNS AT PUBLIC HIGHWAY-RAIL...

  13. 49 CFR 222.5 - What railroads does this regulation apply to?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... per hour over public highway-rail grade crossings; and (c) Rapid transit operations within an urban area that are not connected to the general railroad system of transportation. See 49 CFR part 209... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION USE OF LOCOMOTIVE HORNS AT PUBLIC HIGHWAY-RAIL...

  14. 49 CFR 222.5 - What railroads does this regulation apply to?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... per hour over public highway-rail grade crossings; and (c) Rapid transit operations within an urban area that are not connected to the general railroad system of transportation. See 49 CFR part 209... CROSSINGS General § 222.5 What railroads does this regulation apply to? This part applies to all...

  15. 49 CFR 222.5 - What railroads does this regulation apply to?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... per hour over public highway-rail grade crossings; and (c) Rapid transit operations within an urban area that are not connected to the general railroad system of transportation. See 49 CFR part 209... CROSSINGS General § 222.5 What railroads does this regulation apply to? This part applies to all...

  16. 75 FR 68861 - Miscellaneous Amendments to the Federal Railroad Administration's Accident/Incident Reporting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-09

    ... railroads and require reporting of occupational illnesses. 39 FR 43222, December 11, 1974. The third major... of railroad operations, 43 FR 10584, March 14, 1978. With respect to employee injury and illness... reporting regulations. 61 FR 30940, June 18, 1996; 61 FR 67477, December 23, 1996. This was the first...

  17. Architecture and operation of the Z Pulsed Power Facility vacuum system.

    SciTech Connect

    Riddle, Allen Chauncey; Petmecky, Don; Weed, John Woodruff

    2010-11-01

    The Z Pulsed Power Facility at Sandia National Laboratories in Albuquerque, New Mexico, USA is one of the world's premier high energy density physics facilities. The Z Facility derives its name from the z-pinch phenomena which is a type of plasma confinement system that uses the electrical current in the plasma to generate a magnetic field that compresses it. Z refers to the direction of current flow, the z axis in a three dimensional Cartesian coordinate system. The multiterawatt, multimegajoule electrical pulse the Facility produces is 100-400 nanoseconds in time. Research and development programs currently being conducted on the Z Facility include inertial confinement fusion, dynamic material properties, laboratory astrophysics and radiation effects. The Z Facility vacuum system consists of two subsystems, center section and load diagnostics. Dry roughing pumps and cryogenic high vacuum pumps are used to evacuate the 40,000 liter, 200 square meter center section of the facility where the experimental load is located. Pumping times on the order of two hours are required to reduce the pressure from atmospheric to 10{sup -5} Torr. The center section is cycled from atmosphere to high vacuum for each experiment. The facility is capable of conducting one to two experiments per day. Numerous smaller vacuum pumping systems are used to evacuate load diagnostics. The megajoules of energy released during an experiment causes damage to the Facility that presents numerous challenges for reliable operation of the vacuum system.

  18. Joint Assessment of ETRR-2 Research Reactor Operations Program, Capabilities, and Facilities

    SciTech Connect

    Bissani, M; O'Kelly, D S

    2006-05-08

    A joint assessment meeting was conducted at the Egyptian Atomic Energy Agency (EAEA) followed by a tour of Egyptian Second Research Reactor (ETRR-2) on March 22 and 23, 2006. The purpose of the visit was to evaluate the capabilities of the new research reactor and its operations under Action Sheet 4 between the U.S. DOE and the EAEA, ''Research Reactor Operation'', and Action Sheet 6, ''Technical assistance in The Production of Radioisotopes''. Preliminary Recommendations of the joint assessment are as follows: (1) ETRR-2 utilization should be increased by encouraging frequent and sustained operations. This can be accomplished in part by (a) Improving the supply-chain management for fresh reactor fuel and alleviating the perception that the existing fuel inventory should be conserved due to unreliable fuel supply; and (b) Promulgating a policy for sample irradiation priority that encourages the use of the reactor and does not leave the decision of when to operate entirely at the discretion of reactor operations staff. (2) Each experimental facility in operation or built for a single purpose should be reevaluated to focus on those that most meet the goals of the EAEA strategic business plan. Temporary or long-term elimination of some experimental programs might be necessary to provide more focused utilization. There may be instances of emerging reactor applications for which no experimental facility is yet designed or envisioned. In some cases, an experimental facility may have a more beneficial use than the purpose for which it was originally designed. For example, (a) An effective Boron Neutron Capture Therapy (BNCT) program requires nearby high quality medical facilities. These facilities are not available and are unlikely to be constructed near the Inshas site. Further, the BNCT facility is not correctly designed for advanced research and therapy programs using epithermal neutrons. (b) The ETRR-2 is frequently operated to provide color-enhanced gemstones but is

  19. Doses to railroad workers from shipments of radioactive materials

    SciTech Connect

    Fields, D.E.; Cottrell, W.D.

    1988-01-01

    Fissile and high-level radioactive wastes are currently transported over long distances by truck and by rail transportation systems. The primary form of fissile material is spent reactor fuel. Transportation operations within DOE are controlled through the Transportation Operations and Management System. DOE projected increases in the rate of shipments have generated concern by railroad companies that railroad workers may be exposed to levels of radiation sufficiently high that a radiation protection program may need to be implemented. To address railroad company concerns, the Health and Safety Research Division at Oak Ridge National Laboratory has estimated doses to railroad workers for two exposure scenarios that were constructed using worker activity data obtained from CSX Transportation for crew and maintenance workers. This characterization of railroad worker activity patterns includes a quantitative evaluation of the duration and rate of exposure. These duration and exposure rate values were evaluated using each of three exposure rate vs. distance models to generate exposure estimates. 14 refs., 1 tab.

  20. Operational Radiation Protection in Synchrotron Light and Free Electron Laser Facilities

    SciTech Connect

    Liu, James C.; Rokni, Sayed H.; Vylet, Vaclav; /Jefferson Lab

    2009-12-11

    The 3rd generation synchrotron radiation (SR) facilities are storage ring based facilities with many insertion devices and photon beamlines, and have low injection beam power (< few tens of watts), but extremely high stored beam power ({approx} 1 GW). The 4th generation x-ray free electron laser (FEL) facilities are based on an electron Linac with a long undulator and have high injection beam power (a few kW). Due to its electron and photon beam characteristics and modes of operation, storage ring and photon beamlines have unique safety aspects, which are the main subjects of this paper. The shielding design limits, operational modes, and beam losses are first reviewed. Shielding analysis (source terms and methodologies) and interlocked safety systems for storage ring and photon beamlines (including SR and gas bremsstrahlung) are described. Specific safety issues for storage ring top-off injection operation and FEL facilities are discussed. The operational safety program, e.g., operation authorization, commissioning, training, and radiation measurements, for SR facilities is also presented.

  1. LESSONS LEARNED - STARTUP AND TRANSITION TO OPERATIONS AT THE 200 WEST PUMP AND TREAT FACILITY

    SciTech Connect

    FINK DE; BERGQUIST GG; BURKE SP

    2012-10-03

    This document lists key Lessons Learned from the Startup Team for the 200 West Pump and Treat Facility Project. The Startup Team on this Project was an integrated, multi-discipline team whose scope was Construction Acceptance Testing (CAT), functional Acceptance Testing Procedures (ATP), and procedure development and implementation. Both maintenance and operations procedures were developed. Included in the operations procedures were the process unit operations. In addition, a training and qualification program was also part of the scope.

  2. Model training curriculum for Low-Level Radioactive Waste Disposal Facility Operations

    SciTech Connect

    Tyner, C.J.; Birk, S.M.

    1995-09-01

    This document is to assist in the development of the training programs required to be in place for the operating license for a low-level radioactive waste disposal facility. It consists of an introductory document and four additional appendixes of individual training program curricula. This information will provide the starting point for the more detailed facility-specific training programs that will be developed as the facility hires and trains new personnel and begins operation. This document is comprehensive and is intended as a guide for the development of a company- or facility-specific program. The individual licensee does not need to use this model training curriculum as written. Instead, this document can be used as a menu for the development, modification, or verification of customized training programs.

  3. Hazard and operability study of the multi-function Waste Tank Facility. Revision 1

    SciTech Connect

    Hughes, M.E.

    1995-05-15

    The Multi-Function Waste Tank Facility (MWTF) East site will be constructed on the west side of the 200E area and the MWTF West site will be constructed in the SW quadrant of the 200W site in the Hanford Area. This is a description of facility hazards that site personnel or the general public could potentially be exposed to during operation. A list of preliminary Design Basis Accidents was developed.

  4. Operational modes for a wave injection facility aboard spacelab and a sub-satellite

    NASA Technical Reports Server (NTRS)

    Dyson, P. L.

    1978-01-01

    Various modes of operation are described for an orbiting wave injection facility planned to measure the properties of waves propagating in space plasma. Such a facility would cover a wide frequency range including MF and HF. Phase shift and Doppler shift measurements will yield more accurate measurements of echo time delay and the angle of arrival. Because Spacelab will involve some sub-satellites, some consideration is given to propagation between two vehicles both at HF and VHF.

  5. Method for loading coal into railroad cars

    SciTech Connect

    Moon, J.L.; Tompkins, J.C.

    1984-07-17

    A system for loading coal or other particles into railroad cars wherein every other railroad car is designated an EVEN railroad car and the remaining every other railroad cars are designated ODD railroad cars. Each EVEN railroad car is weighed after being filled with coal and before the initiation of the loading of coal into the next EVEN railroad car to determine a filled weight. The filled weight of each EVEN railroad car is compared to a predetermined control weight and, in response to this determination, the termination of the loading of coal into the next EVEN railroad car controllably is varied to bring the filled weight closer to control weight. In a like manner, each ODD railroad car is weighed after being filled with coal and before the initiation of the loading of coal into the next ODD railroad car to determine a filled weight. The filled weight of each ODD railroad car is compared to the predetermined control weight and, in response to this determination, the termination of the loading of coal into the next ODD railroad car controllably is varied to bring the filled weight closer to the control weight.

  6. 43 CFR 3276.12 - What information must I give BLM in the monthly report for facility operations?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... facilities, include in your monthly report of facility operations: (1) Mass of steam and/or hot water, in klbs, used or brought into the facility. For facilities using both steam and hot water, you must report the mass of each; (2) The temperature of the steam or hot water in deg. F; (3) The pressure of...

  7. Reference Mission Operational Analysis Document (RMOAD) for the Life Sciences Research Facilities

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The space station will be constructed during the next decade as an orbiting, low-gravity, permanent facility. The facility will provide a multitude of research opportunities for many different users. The pressurized research laboratory will allow life scientists to study the effects of long-term exposure to microgravity on humans, animals, and plants. The results of these studies will increase our understanding of this foreign environment on basic life processes and ensure the safety of man's long-term presence in space. This document establishes initial operational requirements for the use of the Life Sciences Research Facility (LSRF) during its construction.

  8. Separate and unsanitary: African American women railroad car cleaners and the Women's Service Section, 1918-1920.

    PubMed

    Muhammad, Robin Dearmon

    2011-01-01

    The Women's Service Section (WSS) investigated federally controlled railroad stations and yards at the end of World War I. Few women worked in car cleaning before the war, and railroad management preferred to block women workers, especially African Americans, from gaining any kind of foothold in railroad work. African American women were the single largest group of railroad car cleaners during this period but they were routinely denied adequate facilities, including toilets, locker rooms, and dining facilities throughout the railroad system. By raising the issues of facilities, workers' rights, and public health, these women shaped federal policy and widened the agenda of the WSS to include a direct attack on segregated workplaces. This article argues that African American women car cleaners launched an industrial campaign that wove together concerns about racism, sexism, and health issues, and successfully removed barriers to women working in a predominately male industry.

  9. 8. VIEW OF EL PASO AND SOUTHWESTERN RAILROAD BRIDGE, PIER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. VIEW OF EL PASO AND SOUTHWESTERN RAILROAD BRIDGE, PIER BETWEEN EAST APPROACH AND RAILROAD, LOOKING NORTH. - El Paso & Southwestern Railroad Rio Grande Bridge, Spanning Rio Grande at Southwestern Railroad, El Paso, El Paso County, TX

  10. 7. VIEW OF EL PASO AND SOUTHWESTERN RAILROAD BRIDGE, PIER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. VIEW OF EL PASO AND SOUTHWESTERN RAILROAD BRIDGE, PIER BETWEEN HIGHWAY AND RAILROAD, LOOKING NORTH. - El Paso & Southwestern Railroad Rio Grande Bridge, Spanning Rio Grande at Southwestern Railroad, El Paso, El Paso County, TX

  11. 4. GENERAL VIEW OF EL PASO AND SOUTHWESTERN RAILROAD BRIDGE, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. GENERAL VIEW OF EL PASO AND SOUTHWESTERN RAILROAD BRIDGE, RAILROAD SPAN, LOOKING NORTH. - El Paso & Southwestern Railroad Rio Grande Bridge, Spanning Rio Grande at Southwestern Railroad, El Paso, El Paso County, TX

  12. 5. GENERAL VIEW OF SOUTHERN PACIFIC RAILROAD BRIDGE, EAST APPROACH, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. GENERAL VIEW OF SOUTHERN PACIFIC RAILROAD BRIDGE, EAST APPROACH, ABUTMENT AND FIRST SET OF PIERS CROSSING RAILROAD LINE, LOOKING NORTH. - Southern Pacific Railroad Bridge, Spanning Rio Grande at Southern Pacific Railroad, El Paso, El Paso County, TX

  13. 8. VIEW OF SOUTHERN PACIFIC RAILROAD BRIDGE, CENTER PIER BETWEEN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. VIEW OF SOUTHERN PACIFIC RAILROAD BRIDGE, CENTER PIER BETWEEN U.S. AND RAILROAD, LOOKING NORTH. - Southern Pacific Railroad Bridge, Spanning Rio Grande at Southern Pacific Railroad, El Paso, El Paso County, TX

  14. 78 FR 62940 - Railroad Revenue Adequacy-2012 Determination

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... Surface Transportation Board Railroad Revenue Adequacy--2012 Determination AGENCY: Surface Transportation... announcing the 2012 revenue adequacy determinations for the Nation's Class I railroads. Two carriers, Norfolk Southern Combined Railroad Subsidiaries and Union Pacific Railroad Company, were found to be...

  15. 78 FR 62002 - Railroad Safety Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-10

    ... 11, 1996 (61 FR 9740), for additional information about the RSAC. Issued in Washington, DC, on... Federal Railroad Administration Railroad Safety Advisory Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of Railroad...

  16. 75 FR 3959 - Railroad Safety Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-25

    ... TRANSPORTATION Federal Railroad Administration Railroad Safety Advisory Committee; Notice of Meeting AGENCY... Railroad Safety Advisory Committee (RSAC) Meeting. SUMMARY: FRA announces the forty-first meeting of the RSAC, a Federal advisory committee that develops railroad safety regulations through a...

  17. 77 FR 28421 - Railroad Safety Advisory Committee; Charter Renewal

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-14

    ... Federal Railroad Administration Railroad Safety Advisory Committee; Charter Renewal AGENCY: Federal... of the Railroad Safety Advisory Committee (RSAC). SUMMARY: FRA announces the charter renewal of the RSAC, a Federal Advisory Committee that develops railroad safety regulations through a...

  18. 75 FR 27053 - Railroad Safety Advisory Committee; Charter Renewal

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-13

    ... Federal Railroad Administration Railroad Safety Advisory Committee; Charter Renewal AGENCY: Federal... of the Railroad Safety Advisory Committee (RSAC). SUMMARY: FRA announces the charter renewal of the RSAC, a Federal Advisory Committee that develops railroad safety regulations through a...

  19. 43 CFR 3276.12 - What information must I give BLM in the monthly report for facility operations?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... steam or hot water in psi. You must also specify whether this is psig or psia; (4) Gross generation in... I give BLM in the monthly report for facility operations? (a) For all electrical generation facilities, include in your monthly report of facility operations: (1) Mass of steam and/or hot water,...

  20. Railroad safety program, volume 1

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Since 1981, the Federal Railroad Administration (FRA) has annually prepared a National Inspection Plan (NIP) whose purpose is to summarize regional efforts to improve railroad transportation safety. The research concluded on the following tasks including the problems, conclusions and recommendations associated with these tasks is summarized: (1) the preparation of the 1983 NIP, with recommended procedures for improving future NIPs; (2) the development of an outline for the 1984 NIP, including a methodology for the allocation of inspection resources and other specialized regional activities; (3) the management and development of the 1984 NIP; and (4) the development of an instruction manual to be used in the preparation of future NIPs.

  1. 76 FR 34805 - Arkansas Midland Railroad Company, Inc., Trackage Rights Exemption; Caddo Valley Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... Surface Transportation Board Arkansas Midland Railroad Company, Inc., Trackage Rights Exemption; Caddo Valley Railroad Company Pursuant to a written trackage rights agreement, Caddo Valley Railroad Company (CVR) has agreed to grant local trackage rights to Arkansas Midland Railroad Company, Inc. (AKMD)...

  2. Lung Cancer in Railroad Workers Exposed to Diesel Exhaust

    PubMed Central

    Garshick, Eric; Laden, Francine; Hart, Jaime E.; Rosner, Bernard; Smith, Thomas J.; Dockery, Douglas W.; Speizer, Frank E.

    2004-01-01

    Diesel exhaust has been suspected to be a lung carcinogen. The assessment of this lung cancer risk has been limited by lack of studies of exposed workers followed for many years. In this study, we assessed lung cancer mortality in 54,973 U.S. railroad workers between 1959 and 1996 (38 years). By 1959, the U.S. railroad industry had largely converted from coal-fired to diesel-powered locomotives. We obtained work histories from the U.S. Railroad Retirement Board, and ascertained mortality using Railroad Retirement Board, Social Security, and Health Care Financing Administration records. Cause of death was obtained from the National Death Index and death certificates. There were 43,593 total deaths including 4,351 lung cancer deaths. Adjusting for a healthy worker survivor effect and age, railroad workers in jobs associated with operating trains had a relative risk of lung cancer mortality of 1.40 (95% confidence interval, 1.30–1.51). Lung cancer mortality did not increase with increasing years of work in these jobs. Lung cancer mortality was elevated in jobs associated with work on trains powered by diesel locomotives. Although a contribution from exposure to coal combustion products before 1959 cannot be excluded, these results suggest that exposure to diesel exhaust contributed to lung cancer mortality in this cohort. PMID:15531439

  3. 49 CFR 219.23 - Railroad policies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Railroad policies. 219.23 Section 219.23 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE General § 219.23 Railroad policies. (a)...

  4. 49 CFR 219.23 - Railroad policies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad policies. 219.23 Section 219.23 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE General § 219.23 Railroad policies. (a)...

  5. 30 CFR 56.9104 - Railroad crossings.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Railroad crossings. 56.9104 Section 56.9104... Dumping Traffic Safety § 56.9104 Railroad crossings. Designated railroad crossings shall be posted with warning signs or signals, or shall be guarded when trains are passing. These crossings shall also...

  6. 30 CFR 57.9104 - Railroad crossings.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Railroad crossings. 57.9104 Section 57.9104... Dumping Traffic Safety § 57.9104 Railroad crossings. Designated railroad crossings shall be posted with warning signs or signals, or shall be guarded when trains are passing. These crossings shall also...

  7. 30 CFR 57.9104 - Railroad crossings.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Railroad crossings. 57.9104 Section 57.9104... Dumping Traffic Safety § 57.9104 Railroad crossings. Designated railroad crossings shall be posted with warning signs or signals, or shall be guarded when trains are passing. These crossings shall also...

  8. 30 CFR 56.9104 - Railroad crossings.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Railroad crossings. 56.9104 Section 56.9104... Dumping Traffic Safety § 56.9104 Railroad crossings. Designated railroad crossings shall be posted with warning signs or signals, or shall be guarded when trains are passing. These crossings shall also...

  9. 30 CFR 57.9104 - Railroad crossings.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Railroad crossings. 57.9104 Section 57.9104... Dumping Traffic Safety § 57.9104 Railroad crossings. Designated railroad crossings shall be posted with warning signs or signals, or shall be guarded when trains are passing. These crossings shall also...

  10. 30 CFR 57.9104 - Railroad crossings.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Railroad crossings. 57.9104 Section 57.9104... Dumping Traffic Safety § 57.9104 Railroad crossings. Designated railroad crossings shall be posted with warning signs or signals, or shall be guarded when trains are passing. These crossings shall also...

  11. 30 CFR 56.9104 - Railroad crossings.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Railroad crossings. 56.9104 Section 56.9104... Dumping Traffic Safety § 56.9104 Railroad crossings. Designated railroad crossings shall be posted with warning signs or signals, or shall be guarded when trains are passing. These crossings shall also...

  12. 30 CFR 56.9104 - Railroad crossings.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Railroad crossings. 56.9104 Section 56.9104... Dumping Traffic Safety § 56.9104 Railroad crossings. Designated railroad crossings shall be posted with warning signs or signals, or shall be guarded when trains are passing. These crossings shall also...

  13. 25 CFR 169.23 - Railroads.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Railroads. 169.23 Section 169.23 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER RIGHTS-OF-WAY OVER INDIAN LANDS § 169.23 Railroads. (a..., individually owned and Government-owned land, except in the State of Oklahoma, for railroads, station...

  14. 30 CFR 57.9104 - Railroad crossings.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Railroad crossings. 57.9104 Section 57.9104 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Dumping Traffic Safety § 57.9104 Railroad crossings. Designated railroad crossings shall be posted...

  15. 30 CFR 56.9104 - Railroad crossings.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Railroad crossings. 56.9104 Section 56.9104 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Dumping Traffic Safety § 56.9104 Railroad crossings. Designated railroad crossings shall be posted...

  16. 49 CFR 219.23 - Railroad policies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad policies. 219.23 Section 219.23 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE General § 219.23 Railroad policies. (a)...

  17. Response of spawning lake sturgeons to change in hydroelectric facility operation

    SciTech Connect

    Auer, N.A.

    1996-01-01

    Spawning of lake sturgeon Acipenser fulvescens was documented from 1987 to 1992 below the Prickett hydroelectric facility on the Sturgeon River, a tributary to Portage Lake, Michigan. Lake sturgeons were captured at the spawning site with dip nets during periods of reduced flow. A change in the spawning characteristics of the population was noted that corresponded to a changed in the operation of the hydroelectric facility. In 1987 and 1988 the facility operated in a peaking mode, which resulted in large daily fluctuations in river flows. The years 1989 and 1990 were years of transition, and in 1991 and 1992 the facility released near run-of-the-river (ROR) flows. Under near-ROR flows, which were more natural, adult lake sturgeons spent 4-6 weeks less at the spawning sites, 74% more fish were observed, weights were greater due to a 68% increase in number of females, and fish had increased reproductive readiness. The change in flow regime was the result of a Federal Energy Regulatory Commission relicensing action. The positive response observed in lake sturgeon spawning activity that resulted from the change of facility operation to near-ROR flows should be beneficial to the survival and perpetuation of this population. Similar results may be experienced in other lake sturgeon waters affected by manipulated flow regimes. 28 refs., 5 figs., 6 tabs.

  18. Slavery and the Underground Railroad.

    ERIC Educational Resources Information Center

    Anderson, Nancy Comfort

    2000-01-01

    Presents a bibliography of sources to help children understand slavery and the Underground Railroad and recommends a combination of fiction and nonfiction for a better understanding. Includes picture books, biographies of people who played prominent roles during the time of slavery, nonfiction books for older readers, and videotape. (LRW)

  19. Railroad safety program, task 2

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Aspects of railroad safety and the preparation of a National Inspection Plan (NIP) for rail safety improvement are examined. Methodology for the allocation of inspection resources, preparation of a NIP instruction manual, and recommendations for future NIP, are described. A statistical analysis of regional rail accidents is presented with causes and suggested preventive measures included.

  20. Review of operating experience at the Los Alamos Plutonium Electrorefining Facility, 1963-1977

    SciTech Connect

    Mullins, L.J.; Morgan, A.N.

    1981-12-01

    This report reviews the operation of the Los Alamos Plutonium Electrorefining Plant at Technical Area 21 for the period 1964 through 1977. During that period, approximately 1568 kg of plutonium metal, > 99.95% pure, was produced in 653 runs from 1930 kg of metal fabrication scrap, 99% pure. General considerations of the electrorefining process and facility operation and recommendations for further improvement of the process are discussed.

  1. 10 CFR 60.132 - Additional design criteria for surface facilities in the geologic repository operations area.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the Geologic Repository Operations Area § 60.132 Additional design criteria for surface facilities in the geologic repository operations area. (a) Facilities for receipt and retrieval of waste. Surface... wastes at the geologic repository operations area, whether these wastes are on the surface...

  2. 26 CFR 1.132-7T - Treatment of employer-operated eating facilities-1985 through 1988 (temporary).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 2 2010-04-01 2010-04-01 false Treatment of employer-operated eating facilities... Excluded from Gross Income § 1.132-7T Treatment of employer-operated eating facilities—1985 through 1988...-operated eating facility for employees is excludable from gross income as a de minimis fringe only if—...

  3. 43 CFR 3276.10 - What are the reporting requirements for facility and lease operations involving Federal...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... facility and lease operations involving Federal geothermal resources? 3276.10 Section 3276.10 Public Lands... INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Reports: Utilization Operations § 3276.10 What are the reporting requirements for facility and lease operations involving Federal...

  4. 43 CFR 3276.10 - What are the reporting requirements for facility and lease operations involving Federal...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... facility and lease operations involving Federal geothermal resources? 3276.10 Section 3276.10 Public Lands... INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Reports: Utilization Operations § 3276.10 What are the reporting requirements for facility and lease operations involving Federal...

  5. 43 CFR 3276.10 - What are the reporting requirements for facility and lease operations involving Federal...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... facility and lease operations involving Federal geothermal resources? 3276.10 Section 3276.10 Public Lands... INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Reports: Utilization Operations § 3276.10 What are the reporting requirements for facility and lease operations involving Federal...

  6. 43 CFR 3276.10 - What are the reporting requirements for facility and lease operations involving Federal...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... facility and lease operations involving Federal geothermal resources? 3276.10 Section 3276.10 Public Lands... INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Reports: Utilization Operations § 3276.10 What are the reporting requirements for facility and lease operations involving Federal...

  7. 26 CFR 1.132-7T - Treatment of employer-operated eating facilities-1985 through 1988 (temporary).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 2 2011-04-01 2011-04-01 false Treatment of employer-operated eating facilities... Excluded from Gross Income § 1.132-7T Treatment of employer-operated eating facilities—1985 through 1988...-operated eating facility for employees is excludable from gross income as a de minimis fringe only if—...

  8. 26 CFR 1.132-7T - Treatment of employer-operated eating facilities-1985 through 1988 (temporary).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 26 Internal Revenue 2 2014-04-01 2014-04-01 false Treatment of employer-operated eating facilities... Excluded from Gross Income § 1.132-7T Treatment of employer-operated eating facilities—1985 through 1988...-operated eating facility for employees is excludable from gross income as a de minimis fringe only if—...

  9. 26 CFR 1.132-7T - Treatment of employer-operated eating facilities-1985 through 1988 (temporary).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 26 Internal Revenue 2 2012-04-01 2012-04-01 false Treatment of employer-operated eating facilities... Excluded from Gross Income § 1.132-7T Treatment of employer-operated eating facilities—1985 through 1988...-operated eating facility for employees is excludable from gross income as a de minimis fringe only if—...

  10. 26 CFR 1.132-7T - Treatment of employer-operated eating facilities-1985 through 1988 (temporary).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 26 Internal Revenue 2 2013-04-01 2013-04-01 false Treatment of employer-operated eating facilities... Excluded from Gross Income § 1.132-7T Treatment of employer-operated eating facilities—1985 through 1988...-operated eating facility for employees is excludable from gross income as a de minimis fringe only if—...

  11. A knowledge acquisition process to analyse operational problems in solid waste management facilities.

    PubMed

    Dokas, Ioannis M; Panagiotakopoulos, Demetrios C

    2006-08-01

    The available expertise on managing and operating solid waste management (SWM) facilities varies among countries and among types of facilities. Few experts are willing to record their experience, while few researchers systematically investigate the chains of events that could trigger operational failures in a facility; expertise acquisition and dissemination, in SWM, is neither popular nor easy, despite the great need for it. This paper presents a knowledge acquisition process aimed at capturing, codifying and expanding reliable expertise and propagating it to non-experts. The knowledge engineer (KE), the person performing the acquisition, must identify the events (or causes) that could trigger a failure, determine whether a specific event could trigger more than one failure, and establish how various events are related among themselves and how they are linked to specific operational problems. The proposed process, which utilizes logic diagrams (fault trees) widely used in system safety and reliability analyses, was used for the analysis of 24 common landfill operational problems. The acquired knowledge led to the development of a web-based expert system (Landfill Operation Management Advisor, http://loma.civil.duth.gr), which estimates the occurrence possibility of operational problems, provides advice and suggests solutions.

  12. 7 CFR 319.40-8 - Processing at facilities operating under compliance agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Processing at facilities operating under compliance agreements. 319.40-8 Section 319.40-8 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FOREIGN QUARANTINE NOTICES...

  13. 76 FR 12763 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... February 22, 2011 (76 FR 9821). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires..., 2300 N Street, NW., Washington, DC 20037. NRC Branch Chief: Michael T. Markley. Notice of Issuance...

  14. 75 FR 23808 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... 20, 2010 (75 FR 20627). Notice of Consideration of Issuance of Amendments to Facility Operating... be filed in accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing... issued a Notice of Availability for TSTF-425 in the Federal Register on July 6, 2009 (74 FR 31996)....

  15. 46 CFR 160.151-47 - Requirements for owners or operators of servicing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., and have available at least one copy of each manufacturer's approved servicing manual, revision, and bulletin; (b) Calibrate each pressure gauge, mechanically-operated barometer, and weighing scale at... in accordance with the approved manual; (e) Specify which makes of liferafts the facility is...

  16. 76 FR 1644 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... December 28, 2010 (75 FR 81667). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... degradation that could affect leak tightness. Therefore, this proposed change does not involve a...

  17. University of Washington Clinical Neutron Facility: Report on 26 Years of Operation

    SciTech Connect

    Laramore, George E.; Emery, Robert; Reid, David; Banerian, Stefani; Kalet, Ira; Jacky, Jonathan; Risler, Ruedi

    2011-12-13

    Particle radiotherapy facilities are highly capital intensive and must operate over decades to recoup the original investment. We describe the successful, long-term operation of a neutron radiotherapy center at the University of Washington, which has been operating continuously since September 1984. To date, 2836 patients have received neutron radiotherapy. The mission of the facility has also evolved to include the production of unique radioisotopes that cannot be made with the low-energy cyclotrons more commonly found in nuclear medicine departments. The facility is also used for neutron damage testing for industrial devices. In this paper, we describe the challenges of operating such a facility over an extended time period, including a planned maintenance and upgrade program serving diverse user groups, and summarize the major clinical results in terms of tumor control and normal tissue toxicity. Over time, the mix of patients being treated has shifted from common tumors such as prostate cancer, lung cancer, and squamous cell tumors of the head and neck to the rarer tumors such as salivary gland tumors and sarcomas due to the results of clinical trials. Current indications for neutron radiotherapy are described and neutron tolerance doses for a range of normal tissues presented.

  18. 75 FR 67399 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-02

    ...) Implementation of a Statistical Design Limit for the analytic code and critical heat flux correlations that are... October 19, 2010 (75 FR 64359). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process...

  19. 76 FR 16004 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... March 8, 2011 (76 FR 12763). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... of the TS specified or selected areas are neither part of an initial condition of a design...

  20. 76 FR 21917 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... April 5, 2011 (76 FR 18801). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... Nuclear Power Plant, Unit 1 and 2, Calvert County, Maryland Date of amendments request: October 25,...

  1. 75 FR 74091 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-30

    ... on November 16, 2010 (75 FR 70032). Notice of Consideration of Issuance of Amendments To Facility... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... on the plant design or on the normal operation of the plant and does not affect how the plant...

  2. 75 FR 54390 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-07

    ... proposed to be issued from August 25, 2010, to September 8, 2010. The last biweekly notice was published on August 24, 2010 (75 FR 52039). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process...

  3. 75 FR 48370 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... 27, 2010 (75 FR 44020). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... use of the AREVA ATRIUM 10XM fuel design at BSEP . The addition of an approved analytical...

  4. 75 FR 20627 - Biweekly Notice: Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ... 6, 2010 (75 FR 17439). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... evaluated? Response: No. The proposed change uses an approved leak-before-break (LBB) fracture...

  5. 77 FR 26321 - Reed College, Reed Research Nuclear Reactor, Renewed Facility Operating License No. R-112

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ... COMMISSION Reed College, Reed Research Nuclear Reactor, Renewed Facility Operating License No. R-112 AGENCY..., Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Rockville, MD 20852. Telephone..., Research and Test Reactors Licensing Branch, Division of Policy and Rulemaking, Office of Nuclear...

  6. 75 FR 13786 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ... March 9, 2010 (75 FR 10823). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... sump solutions. This pH range minimizes both the evolution of iodine and the effect of chloride...

  7. 75 FR 4111 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-26

    ... January 12, 2010 (75 FR 1655). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... testing criteria to account for the 95% charcoal efficiency assumed for elemental iodine in the...

  8. 75 FR 77906 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-14

    ... on November 30, 2010 (75 FR 74091). Notice of Consideration of Issuance of Amendments to Facility... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... osmosis system during normal plant operation to remove silica from borated water storage tank and...

  9. 76 FR 31369 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ..., 2011 (76 FR 28470). Notice of Consideration of Issuance of Amendments to Facility Operating Licenses... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... on December 17, 2010 (75 FR 79048) as part of the consolidated line item improvement process...

  10. 75 FR 70032 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... November 2, 2010 (75 FR 67399). Notice of Consideration of Issuance of Amendments to Facility Operating... effect of any decision or order which may be entered in the proceeding on the requestor's/petitioner's... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process...

  11. 76 FR 28470 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-17

    ..., 2011 (76 FR 24926). Notice of Consideration of Issuance of Amendments to Facility Operating Licenses... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... consideration (NSHC) analysis endorsed by the NRC staff in a December 29, 2006, Federal Register notice (71...

  12. 75 FR 17439 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-06

    ... March 23, 2010 (75 FR 13786). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... during Mode 4 or 5 (cold shutdown or refueling conditions) will provide greater flexibility in...

  13. 75 FR 30440 - Biweekly Notice: Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... (75 FR 27825). Notice of Consideration of Issuance of Amendments to Facility Operating Licenses... that a genuine dispute exists with the applicant on a material issue of law or fact. Contentions shall... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process...

  14. 75 FR 37471 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-29

    ..., 2010 (75 FR 33839). Notice of Consideration of Issuance of Amendments to Facility Operating Licenses... include sufficient information to show that a genuine dispute exists with the applicant on a material... be filed in accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The...

  15. 75 FR 64359 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-19

    .... The aluminum (alloy 6061) and boron carbide materials of construction have been shown to be compatible... October 5, 2010, (75 FR 61521). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process...

  16. 75 FR 44020 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-27

    ... material in addition to the boron carbide control rod material. Basis for proposed no significant hazards..., 2010 (75 FR 39975). Notice of Consideration of Issuance of Amendments to Facility Operating Licenses... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process...

  17. 77 FR 1743 - Facility Operating License Amendment From Florida Power Corporation, Crystal River Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires participants to submit...\\ Requestors should note that the filing requirements of the NRC's E-Filing Rule (72 FR 49139; August 28, 2007... COMMISSION Facility Operating License Amendment From Florida Power Corporation, Crystal River...

  18. 76 FR 4381 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ....6.10 and TS 3.6.16 maintain the required design margins of the Reactor Building and AVS for all... January 11, 2011 (76 FR 1644). Notice of Consideration of Issuance of Amendments to Facility Operating... provide a brief explanation of the bases for the contention and a concise statement of the alleged...

  19. A Brief Study of Cafeteria Facilities and Operations, with Recommendations for Implementation.

    ERIC Educational Resources Information Center

    Okamura, James T.

    The facilities and operations of the school lunch program in the public schools of Hawaii are reviewed. Several types of school lunch programs are described including--(1) traditional school lunch programs, (2) kitchen and classroom dining, (3) central and decentralized dining, (4) home school-feeder school system, (5) central kitchen, and (6) the…

  20. 75 FR 1655 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-12

    ... on December 29, 2009 (74 FR 68867). Notice of Issuance of Amendments to Facility Operating Licenses... rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment....

  1. Operation, Maintenance and Management of Wastewater Treatment Facilities: A Bibliography of Technical Documents.

    ERIC Educational Resources Information Center

    Himes, Dottie

    This is an annotated bibliography of wastewater treatment manuals. Fourteen manuals are abstracted including: (1) A Planned Maintenance Management System for Municipal Wastewater Treatment Plants; (2) Anaerobic Sludge Digestion, Operations Manual; (3) Emergency Planning for Municipal Wastewater Treatment Facilities; (4) Estimating Laboratory Needs…

  2. 43 CFR 3275.13 - How must the facility operator measure the geothermal resources?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... geothermal resources? 3275.13 Section 3275.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL... geothermal resources? The facility operator must: (a) Measure all production, injection and utilization...

  3. 43 CFR 3275.13 - How must the facility operator measure the geothermal resources?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... geothermal resources? 3275.13 Section 3275.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL... geothermal resources? The facility operator must: (a) Measure all production, injection and utilization...

  4. 43 CFR 3275.13 - How must the facility operator measure the geothermal resources?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... geothermal resources? 3275.13 Section 3275.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL... geothermal resources? The facility operator must: (a) Measure all production, injection and utilization...

  5. 43 CFR 3275.13 - How must the facility operator measure the geothermal resources?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... geothermal resources? 3275.13 Section 3275.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL... geothermal resources? The facility operator must: (a) Measure all production, injection and utilization...

  6. 76 FR 18801 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... March 22, 2011 (76 FR 16004). Notice of Consideration of Issuance of Amendments to Facility Operating... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires..., 2011 (76 FR 1646). The letter dated December 9, 2010, provided additional information that...

  7. 75 FR 27825 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... May 4, 2010 (75 FR 23808). Notice of Consideration of Issuance of Amendments to Facility Operating... be filed in accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing... Federal Register on October 22, 2003 (68 FR 60422) as part of the consolidated line item...

  8. 75 FR 33839 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-15

    ..., 2010 (75 FR 30440). Notice of Consideration of Issuance of Amendments to Facility Operating Licenses... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... parameter affecting the course of a decommissioning activity accident analysis. Therefore, the...

  9. 78 FR 16302 - Crystal River Unit 3 Nuclear Generating Plant, Application for Amendment to Facility Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-14

    ... Consideration of Issuance of Amendment published in the Federal Register on January 11, 2012 (77 FR 1743), and a... published in the Federal Register on January 16, 2013 (78 FR 3458). However, by letter dated February 7... Florida, Citrus County. The proposed amendment would have revised the facility operating license and...

  10. Implementation of conduct of operations at Paducah uranium hexafluoride (UF{sub 6}) sampling and transfer facility

    SciTech Connect

    Penrod, S.R.

    1991-12-31

    This paper describes the initial planning and actual field activities associated with the implementation of {open_quotes}Conduct of Operations{close_quotes}. Conduct of Operations is an operating philosophy that was developed through the Institute of Nuclear Power Operations (INPO). Conduct of Operations covers many operating practices and is intended to provide formality and discipline to all aspects of plant operation. The implementation of these operating principles at the UF{sub 6} Sampling and Transfer Facility resulted in significant improvements in facility operations.

  11. Implementation of conduct of operations at Paducah uranium hexafluoride (UF{sub 6}) sampling and transfer facility

    SciTech Connect

    Penrod, S.R.

    1991-12-31

    This paper describes the initial planning and actual field activities associated with the implementation of {open_quotes}Conduct of Operations{close_quotes}, Conduct of Operations is an operating philosophy that was developed through the Institute of Nuclear Power Operations (INPO). Conduct of Operations covers many operating practices and is intended to provide formality and discipline to all aspects of plant operation. The implementation of these operating principles at the UF{sub 6} Sampling and Transfer Facility resulted in significant improvements in facility operations.

  12. 76 FR 77889 - Watco Holdings, Inc.-Continuance in Control Exemption-Swan Ranch Railroad, L.L.C.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-14

    ..., L.L.C. Watco Holdings, Inc. (Watco) has filed a verified notice of exemption pursuant to 49 CFR 1180.2(d)(2) to continue in control of Swan Ranch Railroad, L.L.C. (SRR), upon SRR's becoming a Class III... Railroad, L.L.C.-- Operation Exemption-Swan Industrial Park, wherein SRR seeks Board approval to operate...

  13. Operating capability and current status of the reactivated NASA Lewis Research Center Hypersonic Tunnel Facility

    NASA Technical Reports Server (NTRS)

    Thomas, Scott R.; Trefny, Charles J.; Pack, William D.

    1995-01-01

    The NASA Lewis Research Center's Hypersonic Tunnel Facility (HTF) is a free-jet, blowdown propulsion test facility that can simulate up to Mach-7 flight conditions with true air composition. Mach-5, -6, and -7 nozzles, each with a 42 inch exit diameter, are available. Previously obtained calibration data indicate that the test flow uniformity of the HTF is good. The facility, without modifications, can accommodate models approximately 10 feet long. The test gas is heated using a graphite core induction heater that generates a nonvitiated flow. The combination of clean-air, large-scale, and Mach-7 capabilities is unique to the HTF and enables an accurate propulsion performance determination. The reactivation of the HTF, in progress since 1990, includes refurbishing the graphite heater, the steam generation plant, the gaseous oxygen system, and all control systems. All systems were checked out and recertified, and environmental systems were upgraded to meet current standards. The data systems were also upgraded to current standards and a communication link with NASA-wide computers was added. In May 1994, the reactivation was complete, and an integrated systems test was conducted to verify facility operability. This paper describes the reactivation, the facility status, the operating capabilities, and specific applications of the HTF.

  14. 49 CFR 1242.53 - Joint facility rents-debit and credit and joint facility-debit and credit (accounts 33-27-00, 34...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Joint facility rents-debit and credit and joint facility-debit and credit (accounts 33-27-00, 34-27-00, 37-27-00 and 38-27-00). 1242.53 Section 1242.53... BETWEEN FREIGHT SERVICE AND PASSENGER SERVICE FOR RAILROADS 1 Operating Expenses-Equipment § 1242.53...

  15. 49 CFR 1242.40 - Joint facility rents-debit and credit, and joint facility-debit and credit (accounts 33-26-00, 34...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Joint facility rents-debit and credit, and joint facility-debit and credit (accounts 33-26-00, 34-26-00, 37-26-00 and 38-26-00). 1242.40 Section 1242.40... BETWEEN FREIGHT SERVICE AND PASSENGER SERVICE FOR RAILROADS 1 Operating Expenses-Equipment § 1242.40...

  16. Linking and Combining Distributed Operations Facilities using NASA's "GMSEC" Systems Architectures

    NASA Technical Reports Server (NTRS)

    Smith, Danford; Grubb, Thomas; Esper, Jaime

    2008-01-01

    NASA's Goddard Mission Services Evolution Center (GMSEC) ground system architecture has been in development since late 2001, has successfully supported eight orbiting satellites and is being applied to many of NASA's future missions. GMSEC can be considered an event-driven service-oriented architecture built around a publish/subscribe message bus middleware. This paper briefly discusses the GMSEC technical approaches which have led to significant cost savings and risk reduction for NASA missions operated at the Goddard Space Flight Center (GSFC). The paper then focuses on the development and operational impacts of extending the architecture across multiple mission operations facilities.

  17. Operational readiness review for the Waste Experimental Reduction Facility. Final report

    SciTech Connect

    Not Available

    1993-11-01

    An Operational Readiness Review (ORR) at the Idaho National Engineering Laboratory`s (INEL`s) Waste Experimental Reduction Facility (WERF) was conducted by EG&G Idaho, Inc., to verify the readiness of WERF to resume operations following a shutdown and modification period of more than two years. It is the conclusion of the ORR Team that, pending satisfactory resolution of all pre-startup findings, WERF has achieved readiness to resume unrestricted operations within the approved safety basis. ORR appraisal forms are included in this report.

  18. Conjunctive operation of river facilities for integrated water resources management in Korea

    NASA Astrophysics Data System (ADS)

    Kim, Hwirin; Jang, Cheolhee; Kim, Sung

    2016-10-01

    With the increasing trend of water-related disasters such as floods and droughts resulting from climate change, the integrated management of water resources is gaining importance recently. Korea has worked towards preventing disasters caused by floods and droughts, managing water resources efficiently through the coordinated operation of river facilities such as dams, weirs, and agricultural reservoirs. This has been pursued to enable everyone to enjoy the benefits inherent to the utilization of water resources, by preserving functional rivers, improving their utility and reducing the degradation of water quality caused by floods and droughts. At the same time, coordinated activities are being conducted in multi-purpose dams, hydro-power dams, weirs, agricultural reservoirs and water use facilities (featuring a daily water intake of over 100 000 m3 day-1) with the purpose of monitoring the management of such facilities. This is being done to ensure the protection of public interest without acting as an obstacle to sound water management practices. During Flood Season, each facilities contain flood control capacity by limited operating level which determined by the Regulation Council in advance. Dam flood discharge decisions are approved through the flood forecasting and management of Flood Control Office due to minimize flood damage for both upstream and downstream. The operational plan is implemented through the council's predetermination while dry season for adequate quantity and distribution of water.

  19. Telescience and microgravity impact on future facilities, ground segments and operations.

    PubMed

    Monti, R

    1989-01-01

    Scientific activities related to experimentation in long duration microgravity missions can only be accomplished by the implementation of the Telescience Concept. Telescience is in fact the logical answer to the need of an intelligent interactive conduct of experiments, to the lack (or very little availability) of crew time on board of the Segments of the Columbus project and to the PIs demand for decentralized operations. Telescience could also be seen as the preparative phase for the ultimate, future exploitation of Microgravity by means of Expert Systems that will utilize AI and Robotics for routine operations (Data Factories, Space Productions and Commercial Enterprises). The implications of Telescience on future Space Activities is reviewed with reference to the Principal Investigator Activities, Crew Members Roles and Facilities. The possibilities offered by newly designed Facilities to be operated in Telescience are pointed out with reference to the scientific objectives that would not be achieved otherwise. Diagnostic facilities (mainly non invasive) that provide digital measurements to be inputted (in real time) into numerical codes for computation of field parameters are being considered. Ground Segment Structure, User Support Centers Organization and Test Bedding activities will be discussed as essential factors of the Telescience Scenario of the Multiuser, permanent platform Facilities for the Microgravity disciplines (Material, Fluid, Life and Engineering Science).

  20. Mutual design of overhead transmission lines and railroad communications and signal systems. Volume 2. Appendixes. Final report

    SciTech Connect

    Taflove, A.; Umashankar, K.R.

    1983-10-01

    Objective was to develop mutual design methods and criteria for overhead ac transmission lines and adjacent railroad systems. This project has addressed basic engineering issues which govern the operation of railroad communications and signal (C and S) systems under conditions of interference from nearby transmission lines. Data and techniques have been compiled and developed to contribute to the achievement of electromagnetic compatibility in a manner that is acceptable to both the power and railroad industries.

  1. Energy Conservation Projects to Benefit the Railroad Industry

    SciTech Connect

    Clifford Mirman; Promod Vohra

    2009-12-31

    The Energy Conservation Projects to benefit the railroad industry using the Norfolk Southern Company as a model for the railroad industry has five unique tasks which are in areas of importance within the rail industry, and specifically in the area of energy conservation. The NIU Engineering and Technology research team looked at five significant areas in which research and development work can provide unique solutions to the railroad industry in energy the conservation. (1) Alternate Fuels - An examination of various blends of bio-based diesel fuels for the railroad industry, using Norfolk Southern as a model for the industry. The team determined that bio-diesel fuel is a suitable alternative to using straight diesel fuel, however, the cost and availability across the country varies to a great extent. (2) Utilization of fuel cells for locomotive power systems - While the application of the fuel cell has been successfully demonstrated in the passenger car, this is a very advanced topic for the railroad industry. There are many safety and power issues that the research team examined. (3) Thermal and emission reduction for current large scale diesel engines - The current locomotive system generates large amount of heat through engine cooling and heat dissipation when the traction motors are used to decelerate the train. The research team evaluated thermal management systems to efficiently deal with large thermal loads developed by the operating engines. (4) Use of Composite and Exotic Replacement Materials - Research team redesigned various components using new materials, coatings, and processes to provide the needed protection. Through design, analysis, and testing, new parts that can withstand the hostile environments were developed. (5) Tribology Applications - Identification of tribology issues in the Railroad industry which play a significant role in the improvement of energy usage. Research team analyzed and developed solutions which resulted in friction

  2. Environmental assessment for device assembly facility operations, Nevada Test Site, Nye County, Nevada. Final report

    SciTech Connect

    1995-05-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), has prepared an environmental assessment (EA), (DOE/EA-0971), to evaluate the impacts of consolidating all nuclear explosive operations at the newly constructed Device Assembly Facility (DAF) in Area 6 of the Nevada Test Site. These operations generally include assembly, disassembly or modification, staging, transportation, testing, maintenance, repair, retrofit, and surveillance. Such operations have previously been conducted at the Nevada Test Site in older facilities located in Area 27. The DAF will provide enhanced capabilities in a state-of-the-art facility for the safe, secure, and efficient handling of high explosives in combination with special nuclear materials (plutonium and highly enriched uranium). Based on the information and analyses in the EA, DOE has determined that the proposed action would not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.). Therefore, an environmental impact statement is not required, and DOE is issuing this finding of no significant impact.

  3. Audit of the radioactive liquid waste treatment facility operations at the Los Alamos National Laboratory

    SciTech Connect

    1997-11-19

    Los Alamos National Laboratory (Los Alamos) generates radioactive and liquid wastes that must be treated before being discharged to the environment. Presently, the liquid wastes are treated in the Radioactive Liquid Waste Treatment Facility (Treatment Facility), which is over 30 years old and in need of repair or replacement. However, there are various ways to satisfy the treatment need. The objective of the audit was to determine whether Los Alamos cost effectively managed its Treatment Facility operations. The audit determined that Los Alamos` treatment costs were significantly higher when compared to similar costs incurred by the private sector. This situation occurred because Los Alamos did not perform a complete analysis of privatization or prepare a {open_quotes}make-or-buy{close_quotes} plan for its treatment operations, although a {open_quotes}make-or-buy{close_quotes} plan requirement was incorporated into the contract in 1996. As a result, Los Alamos may be spending $2.15 million more than necessary each year and could needlessly spend $10.75 million over the next five years to treat its radioactive liquid waste. In addition, Los Alamos has proposed to spend $13 million for a new treatment facility that may not be needed if privatization proves to be a cost effective alternative. We recommended that the Manager, Albuquerque Operations Office (Albuquerque), (1) require Los Alamos to prepare a {open_quotes}make-or-buy{close_quotes} plan for its radioactive liquid waste treatment operations, (2) review the plan for approval, and (3) direct Los Alamos to select the most cost effective method of operations while also considering other factors such as mission support, reliability, and long-term program needs. Albuquerque concurred with the recommendations.

  4. Construction and operation of replacement hazardous waste handling facility at Lawrence Berkeley Laboratory. Environmental Assessment

    SciTech Connect

    Not Available

    1992-09-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0423, for the construction and operation of a replacement hazardous waste handling facility (HWHF) and decontamination of the existing HWHF at Lawrence Berkeley Laboratory (LBL), Berkeley, California. The proposed facility would replace several older buildings and cargo containers currently being used for waste handling activities and consolidate the LBL`s existing waste handling activities in one location. The nature of the waste handling activities and the waste volume and characteristics would not change as a result of construction of the new facility. Based on the analysis in the EA, DOE has determined that the proposed action would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC. 4321 et seq. Therefore, an environmental impact statement is not required.

  5. 42 CFR 476.88 - Examination of the operations and records of health care facilities and practitioners.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... care facilities and practitioners. 476.88 Section 476.88 Public Health CENTERS FOR MEDICARE & MEDICAID... Functions § 476.88 Examination of the operations and records of health care facilities and practitioners. (a... examine its operation and records (including information on charges) that are pertinent to health...

  6. 78 FR 25081 - Reissuance of Final NPDES General Permits for Facilities/Operations That Generate, Treat, and/or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ... AGENCY Reissuance of Final NPDES General Permits for Facilities/ Operations That Generate, Treat, and/or... Discharge Elimination System (NPDES) general permits for facilities or operations that generate, treat, and... EPA Region 8 Web page at http://www.epa.gov/region08/water/biosolids/documents.html . Please allow...

  7. 34 CFR 222.142 - What terms and conditions apply to minimum school facilities operated under section 8008 by...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 1 2013-07-01 2013-07-01 false What terms and conditions apply to minimum school facilities operated under section 8008 by another agency? 222.142 Section 222.142 Education Regulations of... What terms and conditions apply to minimum school facilities operated under section 8008 by...

  8. California Federal Facilities: Rate-Responsive Building Operation for Deeper Cost and Energy Savings

    SciTech Connect

    2012-05-01

    Dynamic pricing electricity tariffs, now the default for large customers in California (peak demand of 200 kW and higher for PG&E and SCE, and 20 kW and higher for SDG&E), are providing Federal facilities new opportunities to cut their electricity bills and help them meet their energy savings mandates. The U.S. Department of Energy’s (DOE) Federal Energy Management Program (FEMP) has created this fact sheet to help California federal facilities take advantage of these opportunities through “rate-responsive building operation.” Rate-responsive building operation involves designing your load management strategies around your facility’s variable electric rate, using measures that require little or no financial investment.

  9. Operations and Maintenance Concept Plan for the Immobilized High Level Waste (IHLW) Interim Storage Facility

    SciTech Connect

    JANIN, L.F.

    2000-08-30

    This O&M Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design.

  10. Atmospheric Radiation Measurement Program Climate Research Facility Operation quarterly report July 1 - September 30, 2010.

    SciTech Connect

    Sisterson, D. L.

    2010-10-26

    Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 2208 hours this quarter). The OPSMAX for the North Slope of Alaska (NSA) locale is 1987.20 hours (0.90 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continues, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or datastream. Data availability reported here refers to the average of the individual, continuous datastreams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to

  11. 49 CFR 228.321 - Showering facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF TRANSPORTATION HOURS OF SERVICE OF RAILROAD EMPLOYEES; RECORDKEEPING AND REPORTING; SLEEPING QUARTERS Safety and Health Requirements for Camp Cars Provided by Railroads as Sleeping Quarters § 228.321 Showering facilities. (a) Number. Each individual camp car that provides sleeping facilities must contain...

  12. Numerical simulations of the first operational conditions of the negative ion test facility SPIDER

    NASA Astrophysics Data System (ADS)

    Serianni, G.; Agostinetti, P.; Antoni, V.; Baltador, C.; Cavenago, M.; Chitarin, G.; Marconato, N.; Pasqualotto, R.; Sartori, E.; Toigo, V.; Veltri, P.

    2016-02-01

    In view of the realization of the negative ion beam injectors for ITER, a test facility, named SPIDER, is under construction in Padova (Italy) to study and optimize production and extraction of negative ions. The present paper is devoted to the analysis of the expected first operations of SPIDER in terms of single-beamlet and multiple-beamlet simulations of the hydrogen beam optics in various operational conditions. The effectiveness of the methods adopted to compensate for the magnetic deflection of the particles is also assessed. Indications for a sequence of the experimental activities are obtained.

  13. Operational evaluation of a proppeller test stand in the quiet flow facility at Langley Research Center

    NASA Technical Reports Server (NTRS)

    Block, P. J. W.

    1982-01-01

    Operational proof tests of a propeller test stand (PTS) in a quiet flow facility (QFF) are presented. The PTS is an experimental test bed for acoustic propeller research in the quiet flow environment of the QFF. These proof tests validate thrust and torque predictions, examine the repeatability of measurements on the PTS, and determine the effect of applying artificial roughness to the propeller blades. Since a thrusting propeller causes an open jet to contract, the potential flow core was surveyed to examine the magnitude of the contraction. These measurements are compared with predicted values. The predictions are used to determine operational limitations for testing a given propeller design in the QFF.

  14. Maintenance and operation of the multispectral data collection and reproduction facilities of the Willow Run Laboratories

    NASA Technical Reports Server (NTRS)

    Hasell, P. G., Jr.; Stewart, S. R.

    1972-01-01

    The accomplishments in multispectral mapping during 1970 and (fiscal year) 1971 are presented. The mapping was done with the instrumented C-47 aircraft owned and operated by Willow Run Laboratories of The University of Michigan. Specific information for flight operations sponsored by NASA/MSC (Manned Spacecraft Center) in 1970 and fiscal year 1971 is presented, and a total listing of flights for 1968, 1969, 1970, and fiscal year 1971 is included in the appendices. The data-collection and reproduction facilities are described.

  15. Numerical simulations of the first operational conditions of the negative ion test facility SPIDER.

    PubMed

    Serianni, G; Agostinetti, P; Antoni, V; Baltador, C; Cavenago, M; Chitarin, G; Marconato, N; Pasqualotto, R; Sartori, E; Toigo, V; Veltri, P

    2016-02-01

    In view of the realization of the negative ion beam injectors for ITER, a test facility, named SPIDER, is under construction in Padova (Italy) to study and optimize production and extraction of negative ions. The present paper is devoted to the analysis of the expected first operations of SPIDER in terms of single-beamlet and multiple-beamlet simulations of the hydrogen beam optics in various operational conditions. The effectiveness of the methods adopted to compensate for the magnetic deflection of the particles is also assessed. Indications for a sequence of the experimental activities are obtained. PMID:26932099

  16. Operation of the 25 kW NASA Lewis Solar Regenerative Fuel Cell Testbed Facility

    SciTech Connect

    Voecks, G.E.; Rohatgi, N.K.; Moore, S.H.

    1996-12-31

    Assembly of the NASA Lewis Research Center Solar Regenerative Fuel Cell Testbed Facility has recently been completed and system testing is in progress. This facility includes the integration of 50 kW photovoltaic solar cell arrays, a 25 kW proton exchange membrane (PEM) electrolysis unit, four 5 kW PEM fuel cells, high pressure hydrogen and oxygen storage vessels, high purity water storage containers, and computer monitoring, control and data acquisition. The purpose of this facility is multi-faceted, but was originally intended to serve as a testbed for evaluating a closed-loop powerplant for future NASA extended life support operations, such as a Lunar outpost, and also as a terrestrial powerplant example for remote or continuous back-up support operations. The fuel cell and electrolyzer subsystems design and assembly were conducted by the Jet Propulsion Laboratory (JPL), the photovoltaic arrays and electrical interconnect to the electrolyzer were provided by the US Navy/China Lake Naval Weapons Center, and testing and operations are being carried out by JPL.

  17. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    SciTech Connect

    Dobson, D; Churby, A; Krieger, E; Maloy, D; White, K

    2011-07-25

    The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtual model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.

  18. Risk management for operations of the Los Alamos critical experiments facility

    SciTech Connect

    Paternoster, R.; Butterfield, K.

    1998-12-31

    The Los Alamos Critical Experiments Facility (LACEF) currently operates two burst reactors (Godiva-IV and Skua), one solution assembly (SHEBA 2--Solution high-Energy Burst Assembly), two fast-spectrum benchmark assemblies (Flattop and Big Ten), and five general-purpose remote assembly machines which may be configured with nuclear materials and assembled by remote control. SNM storage vaults support these and other operations at the site. With this diverse set of operations, several approaches are possible in the analysis and management of risk. The most conservative approach would be to write a safety analysis report (SAR) for each assembly and experiment. A more cost-effective approach is to analyze the probability and consequences of several classes of operations representative of operations on each critical assembly machine and envelope the bounding case accidents. Although the neutron physics of these machines varies widely, the operations performed at LACEF fall into four operational modes: steady-state mode, approach-to-critical mode, prompt burst mode, and nuclear material operations which can include critical assembly fuel loading. The operational sequences of each mode are very nearly the same, whether operated on one assembly machine or another. The use of an envelope approach to accident analysis is facilitated by the use of classes of operations and the use of bounding case consequence analysis. A simple fault tree analysis of operational modes helps resolve which operations are sensitive to human error and which are initiated by hardware of software failures. Where possible, these errors and failures are blocked by TSR LCOs.

  19. 23 CFR 646.107 - Railroad protective insurance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Railroad protective insurance. 646.107 Section 646.107... RAILROADS Railroad-Highway Insurance Protection § 646.107 Railroad protective insurance. In connection with highway projects for the elimination of hazards of railroad-highway crossings and other...

  20. 23 CFR 646.107 - Railroad protective insurance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Railroad protective insurance. 646.107 Section 646.107... RAILROADS Railroad-Highway Insurance Protection § 646.107 Railroad protective insurance. In connection with highway projects for the elimination of hazards of railroad-highway crossings and other...

  1. 20 CFR 225.14 - Railroad Earnings Dual Benefit PIA.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 1 2014-04-01 2012-04-01 true Railroad Earnings Dual Benefit PIA. 225.14 Section 225.14 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD RETIREMENT ACT... Annuities § 225.14 Railroad Earnings Dual Benefit PIA. (a) General. The Railroad Earnings Dual Benefit...

  2. 20 CFR 225.14 - Railroad Earnings Dual Benefit PIA.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 1 2012-04-01 2012-04-01 false Railroad Earnings Dual Benefit PIA. 225.14 Section 225.14 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD RETIREMENT ACT... Annuities § 225.14 Railroad Earnings Dual Benefit PIA. (a) General. The Railroad Earnings Dual Benefit...

  3. 20 CFR 225.14 - Railroad Earnings Dual Benefit PIA.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 1 2011-04-01 2011-04-01 false Railroad Earnings Dual Benefit PIA. 225.14 Section 225.14 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD RETIREMENT ACT... Annuities § 225.14 Railroad Earnings Dual Benefit PIA. (a) General. The Railroad Earnings Dual Benefit...

  4. 20 CFR 225.14 - Railroad Earnings Dual Benefit PIA.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 1 2013-04-01 2012-04-01 true Railroad Earnings Dual Benefit PIA. 225.14 Section 225.14 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD RETIREMENT ACT... Annuities § 225.14 Railroad Earnings Dual Benefit PIA. (a) General. The Railroad Earnings Dual Benefit...

  5. 23 CFR 646.107 - Railroad protective insurance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Railroad protective insurance. 646.107 Section 646.107... RAILROADS Railroad-Highway Insurance Protection § 646.107 Railroad protective insurance. In connection with highway projects for the elimination of hazards of railroad-highway crossings and other...

  6. 23 CFR 646.107 - Railroad protective insurance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Railroad protective insurance. 646.107 Section 646.107... RAILROADS Railroad-Highway Insurance Protection § 646.107 Railroad protective insurance. In connection with highway projects for the elimination of hazards of railroad-highway crossings and other...

  7. 23 CFR 646.107 - Railroad protective insurance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Railroad protective insurance. 646.107 Section 646.107... RAILROADS Railroad-Highway Insurance Protection § 646.107 Railroad protective insurance. In connection with highway projects for the elimination of hazards of railroad-highway crossings and other...

  8. 20 CFR 225.14 - Railroad Earnings Dual Benefit PIA.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Railroad Earnings Dual Benefit PIA. 225.14 Section 225.14 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD RETIREMENT ACT... Annuities § 225.14 Railroad Earnings Dual Benefit PIA. (a) General. The Railroad Earnings Dual Benefit...

  9. East (rear) elevation of the tower. In railroad parlance, Orbisonia ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    East (rear) elevation of the tower. In railroad parlance, Orbisonia (railroad north) would be toward the left, and Robertsdale (railroad south) would be toward the right. - East Broad Top Railroad & Company, Water Tank at Coles Station, East Broad Top Railroad & Company (at Milepost 24.3), 0.5 miles east of Coles Valley Road, Saltillo, Huntingdon County, PA

  10. West (trackside) elevation of the tower. In railroad parlance, Orbisonia ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    West (trackside) elevation of the tower. In railroad parlance, Orbisonia (railroad north) would be toward the right, and Robertsdale (railroad south) would be toward the left. - East Broad Top Railroad & Company, Water Tank at Coles Station, East Broad Top Railroad & Company (at Milepost 24.3), 0.5 miles east of Coles Valley Road, Saltillo, Huntingdon County, PA

  11. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report. October 1 - December 31, 2009.

    SciTech Connect

    D. L. Sisterson

    2010-01-12

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2010 for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208); for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208); and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 x 2,208). The ARM Mobile Facility (AMF) deployment in Graciosa Island, the Azores, Portugal, continues; its OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are the result of downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to

  12. Umatilla Basin Fish Facilities Operation & Maintenance : Annual Report Fiscal Year 2008.

    SciTech Connect

    Wick, Mike

    2008-12-30

    Westland Irrigation District, as contractor to Bonneville Power Administration, and West Extension Irrigation District, as subcontractor to Westland, provide labor, equipment, and material necessary for the operation, care, and maintenance of fish facilities on the Umatilla River. Westland Irrigation District is the contractor of record. Job sites that are covered: Three Mile Right, Three Mile Left, Three Mile Adult Spawning, WEID Sampling Facility, Maxwell Screen Site, Westland Screen Site/Ladder/Juvenile Sampling Facility, Feed Canal Ladder/Screen Site, Stanfield Ladder/Screen Site, Minthorn Holding Facility, Thornhollow Acclimation Site, Imeques Acclimation Site, Pendleton Acclimation Site, and South Fork Walla Walla Spawning Facility. O & M personnel coordinate with the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) personnel in performing tasks under this contract including scheduling of trap and haul, sampling, acclimation site maintenance, and other related activities as needed. The input from ODFW biologists Bill Duke and Ken Loffink, and CTUIR biologist Preston Bronson is indispensable to the success of the project, and is gratefully acknowledged. All tasks associated with the project were successfully completed during the fiscal year 2008 work period of October, 2007 through September, 2008. The project provides operations and maintenance throughout the year on five fish screen sites with a total of thirty-four rotating drum-screens, and four fish ladders in the Umatilla River Basin; additionally, periodic operations and maintenance is performed at holding, acclimation, and spawning sites in the Basin. Three people are employed full-time to perform these tasks. The FY08 budget for this project was $492,405 and actual expenditures were $490,267.01. Selected work activities and concerns: (1) Feed Dam Passage Improvement Project - A project to improve fish passage over the short term at the

  13. 75 FR 18253 - R.J. Corman Railroad Property, LLC-Acquisition Exemption-NC Railroad, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... Surface Transportation Board R.J. Corman Railroad Property, LLC--Acquisition Exemption--NC Railroad, Inc. R.J. Corman Railroad Property, LLC (RJC Railroad Property), a Class III rail carrier, has filed a... concurrently filed notice of exemption in STB Finance Docket No. 35364, R.J. Corman Railroad...

  14. 77 FR 23321 - Kiamichi Railroad L.L.C.-Trackage Rights Exemption-WFEC Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Kiamichi Railroad L.L.C.--Trackage Rights Exemption--WFEC Railroad Company... agreed to grant limited nonexclusive overhead trackage rights to Kiamichi Railroad L.L.C. (KRR), over...

  15. 77 FR 3840 - Iowa Interstate Railroad, Ltd.-Lease Exemption-Line of Cedar Rapids and Iowa City Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ... Surface Transportation Board Iowa Interstate Railroad, Ltd.--Lease Exemption--Line of Cedar Rapids and Iowa City Railway Company AGENCY: Surface Transportation Board. ACTION: Notice of Exemption. SUMMARY.... 10902 for Iowa Interstate Railroad, Ltd. (IAIS), a Class II rail carrier, to lease and operate 8.4...

  16. National Ignition Facility start-up/operations engineering and special equipment construction health and safety plan

    SciTech Connect

    Huddleston, P C

    1998-05-08

    This document sets forth the responsibilities, interfaces, guidelines, rules, policy, and regulations for all workers involved in the S/O and SE construction, installation, and acceptance testing. This document is enforced from the first day that S/O and SE workers set foot on the NIF construction site until the end of the Project at Critical Decision 4. This document is applicable only to site activities, which are defined as those that occur within the perimeter of the fenced-off NIF construction zone and the Target Chamber Assembly Area (Helipad). The associated Special Equipment laydown and construction support areas listed in Appendix B are not under this plan; their safety provisions are discussed in the Appendix. Prototype and other support activities, such as the Amplifier Laboratory and Frame Assembly Unit assembly area, are not included in this plan. After completion of the Operational Readiness Review, the Facility Safety Procedure, Operational Safety Requirements, and Operational Safety Procedures are the governing safety documents for the operating facility. The S/O and SE project elements are required to implement measures that create a universal awareness of and promote safe job practices at the site. This includes all Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory, Sandia National Laboratories, University of Rochester, supplement labor organization, and subcontractor employees; visitors; and guests serving the S/O and SE effort.

  17. The cost of radiotherapy as a function of facility size and hours of operation.

    PubMed

    Dunscombe, P; Roberts, G; Walker, J

    1999-06-01

    Against a background of constant or decreasing budgets, this study was undertaken to investigate the economic effects of changes in selected operational parameters within a radiation treatment programme. Using financial data from the Northeastern Ontario Regional Cancer Centre and a recognized staffing model, a commercial spreadsheet has been used to calculate the cost of an 18 fraction course of radiotherapy, including all the major preparatory processes such as simulation and treatment planning. Using the spreadsheet, and on the basis of explicit and reasonable assumptions, the cost of radiotherapy has been calculated as the facility size (i.e. equipment complement) and hours of operation are varied. Based on the assumptions used, the cost of radiotherapy in a facility treating less than about 1600 patients per year starts to rise. At 400 patients per year, a course costs approximately 50% more than at 1600 patients per annum. Extended hours of operation do not appear to generate significant, if any, savings when realistic assumptions about machine lifetime and overtime payments are made. Using a spreadsheet to simulate changes in a radiation treatment programme can be an important decision-making tool, as the effects of changes in operating parameters can be demonstrated.

  18. The Greening of a Plutonium Facility through Personnel Safety, Operational Efficiency, and Infrastructure Improvements - 12108

    SciTech Connect

    Dodge, Robert L.; Cournoyer, Michael E.

    2012-07-01

    Chemical and metallurgical operations involving plutonium and other hazardous materials account for most activities performed at the Los Alamos National Laboratory's Plutonium Facility (TA-55). Engineered barriers provide the most effective protection from hazardous materials. These safety features serve to protect workers and provide defense in depth against the hazards associated with operations. Although not designed to specifically meet environmental requirements the safety-based design does meet or exceed the requirements of the environmental regulations enacted during and since its construction. TA-55's Waste Services Group supports this safety methodology by ensuring safe, efficient and compliant management of all radioactive and hazardous wastes generated at the TA-55. A key function of this group is the implementation of measures that lower the overall risk of radiological and hazardous material operations. Processes and procedures that reduce waste generation compared to current, prevalent processes or procedures used for the same purpose are identified. Some of these 'Best Practices' include implementation of a chemical control system, elimination of aerosol cans, reduction in hazardous waste, implementation of zero liquid discharge, and the re-cyclization of nitric acid. P2/WMin opportunities have been implemented in the areas of personnel and facility attributes, environmental compliance, energy conservation, and green focused infrastructure expansion with the overall objective of minimizing raw material and energy consumption and waste generation. This increases technical knowledge and augments operational safety. (authors)

  19. Atmospheric Radiation Measurement program climate research facility operations quarterly report October 1 - December 31, 2008.

    SciTech Connect

    Sisterson, D. L.

    2009-01-15

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, they calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The US Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208), and for the Tropical Western Pacific (TWP) locale is 1,876.80 hours (0.85 x 2,208). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because the data have not yet been released from China to the DMF for processing. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is

  20. Activities and operations of the Advanced Computing Research Facility, July-October 1986

    SciTech Connect

    Pieper, G.W.

    1986-01-01

    Research activities and operations of the Advanced Computing Research Facility (ACRF) at Argonne National Laboratory are discussed for the period from July 1986 through October 1986. The facility is currently supported by the Department of Energy, and is operated by the Mathematics and Computer Science Division at Argonne. Over the past four-month period, a new commercial multiprocessor, the Intel iPSC-VX/d4 hypercube was installed. In addition, four other commercial multiprocessors continue to be available for research - an Encore Multimax, a Sequent Balance 21000, an Alliant FX/8, and an Intel iPSC/d5 - as well as a locally designed multiprocessor, the Lemur. These machines are being actively used by scientists at Argonne and throughout the nation in a wide variety of projects concerning computer systems with parallel and vector architectures. A variety of classes, workshops, and seminars have been sponsored to train researchers on computing techniques for the advanced computer systems at the Advanced Computing Research Facility. For example, courses were offered on writing programs for parallel computer systems and hosted the first annual Alliant users group meeting. A Sequent users group meeting and a two-day workshop on performance evaluation of parallel computers and programs are being organized.