Science.gov

Sample records for railroad facility operations

  1. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... movement. (m) Recessed railroad switches shall be enclosed to provide a level surface. (n) Warning signs... 29 Labor 7 2011-07-01 2011-07-01 false Railroad facilities. 1917.17 Section 1917.17 Labor... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.17 Railroad facilities. (a) Work shall...

  2. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... movement. (m) Recessed railroad switches shall be enclosed to provide a level surface. (n) Warning signs... 29 Labor 7 2010-07-01 2010-07-01 false Railroad facilities. 1917.17 Section 1917.17 Labor... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.17 Railroad facilities. (a) Work shall...

  3. 77 FR 75701 - Landisville Railroad, LLC-Operation Exemption-Buckeye East Chicago Railroad LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... Surface Transportation Board Landisville Railroad, LLC--Operation Exemption--Buckeye East Chicago Railroad... railroad right-of-way, and bulk liquid transloading facilities owned by Buckeye East Chicago Railroad, LLC, a Class III rail carrier, in East Chicago, Ind.\\2\\ \\1\\ Applicant states that the track does not have...

  4. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.17 Railroad facilities. (a) Work shall be performed in railcars only if floors of the railcars are in visibly safe condition for the work activity... and from places of employment without passing under, over or through railcars, or between cars...

  5. 75 FR 11224 - Albany & Eastern Railroad Company-Acquisition and Operation Exemption-Union Pacific Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... TRANSPORTATION Surface Transportation Board Albany & Eastern Railroad Company--Acquisition and Operation Exemption--Union Pacific Railroad Company and Willamette & Pacific Railroad, Inc. Albany & Eastern Railroad...--Acquisition Exemption--Union Pacific Railroad Company. In that proceeding, VFRC, LLC (VFRC) seeks an exemption...

  6. 76 FR 50326 - Tyburn Railroad, LLC-Acquisition and Operation Exemption-Tyburn Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... Surface Transportation Board Tyburn Railroad, LLC--Acquisition and Operation Exemption--Tyburn Railroad Company Tyburn Railroad, LLC (Tyburn), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Tyburn Railroad Company and operate approximately 0.9 miles of rail lines in...

  7. 75 FR 66421 - HC Railroad, LLC-Acquisition and Operation Exemption-Honey Creek Railroad, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ... TRANSPORTATION Surface Transportation Board HC Railroad, LLC--Acquisition and Operation Exemption--Honey Creek Railroad, Inc. HC Railroad, LLC (HC), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from the Honey Creek Railroad (HCR), and to operate 6.4 miles of HCR's rail...

  8. 77 FR 55268 - Union Pacific Railroad Company-Acquisition and Operation Exemption-San Pedro Railroad Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... Surface Transportation Board Union Pacific Railroad Company--Acquisition and Operation Exemption--San Pedro Railroad Operating Company, LLC Union Pacific Railroad Company (UP) has filed a verified notice of exemption under: (1) 49 CFR 1180.2(d)(1) to acquire and operate over San Pedro Railroad Operating Company...

  9. 77 FR 57188 - Rusk, Palestine & Pacific Railroad, LLC-Operation Exemption-Texas State Railroad Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-17

    ... Surface Transportation Board Rusk, Palestine & Pacific Railroad, LLC--Operation Exemption-- Texas State Railroad Authority Rusk, Palestine & Pacific Railroad, LLC (RP&P), formerly American Heritage Railways of...) between Rusk and Palestine, Tex., currently owned by the Texas Parks and Wildlife Authority. The Line is...

  10. 75 FR 68398 - Golden Triangle Railroad, LLC-Acquisition and Operation Exemption-Golden Triangle Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... Woods Railroad, LLC, and Texas, Oklahoma & Eastern Railroad, LLC, in which Patriot Rail, LLC and its..., Oklahoma & Eastern Railroad Company; and (5) Docket No. FD 35431, Patriot Woods Railroad, LLC-- Acquisition and Operation Exemption--Weyerhaeuser NR Company, Weyerhaeuser Woods Railroad Operating Division....

  11. 62. RAILROAD FACILITIES, TRUCKING PASSAGE, MAIL TRANSPORT AREA, ACCESS TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    62. RAILROAD FACILITIES, TRUCKING PASSAGE, MAIL TRANSPORT AREA, ACCESS TO POST OFFICE BUILDING, VIEW TO WEST - Terminal Tower Building, Cleveland Union Terminal, 50 Public Square, Cleveland, Cuyahoga County, OH

  12. 61. RAILROAD FACILITIES, TRUCKING PASSAGE, MAIL TRANSPORT AREA, UNDER HURON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    61. RAILROAD FACILITIES, TRUCKING PASSAGE, MAIL TRANSPORT AREA, UNDER HURON ROAD, BAGGAGE ELEVATOR, VIEW TO WEST - Terminal Tower Building, Cleveland Union Terminal, 50 Public Square, Cleveland, Cuyahoga County, OH

  13. 55. RAILROAD FACILITIES, TRUCKING PASSAGE, MAIL TRANSPORT AREA UNDER HURON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    55. RAILROAD FACILITIES, TRUCKING PASSAGE, MAIL TRANSPORT AREA UNDER HURON ROAD, LEVEL 85, VIEW TO EAST - Terminal Tower Building, Cleveland Union Terminal, 50 Public Square, Cleveland, Cuyahoga County, OH

  14. 77 FR 34125 - Indexing the Annual Operating Revenues of Railroads

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... indexing methodology insures that railroads are classified based on real business expansion and not from...

  15. 78 FR 21007 - Indexing the Annual Operating Revenues of Railroads

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-08

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF TRANSPORTATION Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... indexing methodology insures that railroads are classified based on real business expansion and not from...

  16. 75 FR 57553 - Indexing the Annual Operating Revenues of Railroads

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... indexing methodology insures that railroads are classified based on real business expansion and not from...

  17. 76 FR 52384 - Indexing the Annual Operating Revenues of Railroads

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... indexing methodology insures that railroads are classified based on real business expansion and not from...

  18. 77 FR 38884 - Sisseton Milbank Railroad Company-Acquisition and Operation Exemption-SLA Property Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Surface Transportation Board Sisseton Milbank Railroad Company--Acquisition and Operation Exemption--SLA Property Management Limited Partnership and Sisseton Milbank Railroad, Inc. Sisseton Milbank Railroad... from SLA Property Management Limited Partnership and Sisseton Milbank Railroad, Inc., their...

  19. 77 FR 50762 - Arkansas-Oklahoma Railroad, Inc.-Lease and Operation Exemption-Line of Union Pacific Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ... Surface Transportation Board Arkansas-Oklahoma Railroad, Inc.--Lease and Operation Exemption-- Line of Union Pacific Railroad Company Arkansas-Oklahoma Railroad, Inc. (AOK), a Class III rail carrier, has filed a verified notice of exemption under 49 CFR 1150.41 to lease from Union Pacific Railroad...

  20. 77 FR 38884 - Wyoming Connect Railroad LLC-Acquisition and Operation Exemption-Union Pacific Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Surface Transportation Board Wyoming Connect Railroad LLC--Acquisition and Operation Exemption--Union Pacific Railroad Company Wyoming Connect Railroad LLC (WCR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire by lease from Union Pacific Railroad Company and to...

  1. 75 FR 18254 - R.J. Corman Railroad Company/Bardstown Line-Lease and Operation Exemption-R.J. Corman Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... Surface Transportation Board R.J. Corman Railroad Company/Bardstown Line--Lease and Operation Exemption--R.J. Corman Railroad Property, LLC R.J. Corman Railroad Company/Bardstown Line (RJC Railroad Company... from R.J. Corman Railroad Property, LLC (RJC Railroad Property), and to operate approximately 42...

  2. 76 FR 39156 - R. J. Corman Railroad Company/Bardstown Line-Lease and Operation Exemption-R. J. Corman Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... Surface Transportation Board R. J. Corman Railroad Company/Bardstown Line--Lease and Operation Exemption--R. J. Corman Railroad Property, LLC R. J. Corman Railroad Company/Bardstown Line (RJC Railroad... from R. J. Corman Railroad Property, LLC (RJC Railroad Property), and operate approximately 42...

  3. 75 FR 68396 - Mississippi & Skuna Valley Railroad, LLC-Acquisition and Operation Exemption-Mississippi & Skuna...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ..., Mississippi & Skuna Valley Railroad, LLC, Patriot Woods Railroad, LLC, and Texas, Oklahoma & Eastern Railroad... Operation Exemption--Texas, Oklahoma & Eastern Railroad Company; and (5) Docket No. FD 35431, Patriot Woods Railroad, LLC--Acquisition and Operation Exemption--Weyerhaeuser NR Company, Weyerhaeuser Woods...

  4. 78 FR 30965 - AG Valley Railroad, LLC-Operation Exemption-Ag Valley Holdings, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... Surface Transportation Board AG Valley Railroad, LLC--Operation Exemption--Ag Valley Holdings, LLC AG... Facility trackage (the Line), in Chicago, Ill., pursuant to an operating agreement with Ag Valley Holdings, LLC, (Ag Valley Holdings). AVRR states that there are no mileposts on the Line. Based on the map...

  5. 75 FR 68399 - Patriot Woods Railroad, LLC-Acquisition and Operation Exemption-Weyerhaeuser NR Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... Surface Transportation Board Patriot Woods Railroad, LLC--Acquisition and Operation Exemption--Weyerhaeuser NR Company, Weyerhaeuser Woods Railroad Operating Division Patriot Woods Railroad, LLC (PAW), a... Company, Weyerhaeuser Woods Railroad Operating Division (Woods RR), and to operate approximately 21.5...

  6. 76 FR 28850 - Northern Plains Railroad, Inc.-Intra-Corporate Family Operation Exemption-Mohall Central Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... Surface Transportation Board Northern Plains Railroad, Inc.--Intra-Corporate Family Operation Exemption... family. The transaction allows NPR to continue to operate the rail line of Mohall Central Railroad, Inc.... & Operation Exemption--Rail Line of BNSF Ry., FD 34759 (STB served Oct. 25, 2005). \\2\\ See N. Plains. R.R...

  7. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and Wireless Communication Procedures § 220.21 Railroad operating rules; radio communications; recordkeeping. (a) The...

  8. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and Wireless Communication Procedures § 220.21 Railroad operating rules; radio communications; recordkeeping. (a) The...

  9. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and Wireless Communication Procedures § 220.21 Railroad operating rules; radio communications; recordkeeping. (a) The...

  10. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and Wireless Communication Procedures § 220.21 Railroad operating rules; radio communications; recordkeeping. (a) The...

  11. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and Wireless Communication Procedures § 220.21 Railroad operating rules; radio communications; recordkeeping. (a) The...

  12. 75 FR 68398 - Texas, Oklahoma & Eastern Railroad, LLC-Acquisition and Operation Exemption-Texas, Oklahoma...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... Surface Transportation Board Texas, Oklahoma & Eastern Railroad, LLC--Acquisition and Operation Exemption--Texas, Oklahoma & Eastern Railroad Company Texas, Oklahoma & Eastern Railroad, LLC (TOE), a noncarrier... & Eastern Railroad Company and to operate approximately 40 miles of rail line between milepost 40.0 (the...

  13. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... regulations and railroad operating rules. 220.43 Section 220.43 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS... regulations and railroad operating rules. Radio communication shall not be used in connection with a...

  14. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad operating employees in deadhead status...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.311 Railroad operating employees in deadhead status. (a) Notwithstanding any other restrictions...

  15. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad operating employees in deadhead status...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.311 Railroad operating employees in deadhead status. (a) Notwithstanding any other restrictions...

  16. 76 FR 68523 - Utah Southern Railroad Company, LLC-Change in Operators Exemption-Iron Bull Railroad Company, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... Surface Transportation Board Utah Southern Railroad Company, LLC--Change in Operators Exemption--Iron Bull... of exemption under 49 CFR 1150.31 to change operators from Iron Bull Railroad Company (IBRC) to USRC... near Iron Springs, Utah, and milepost 14.7 at or near Iron Mountain, Utah, a distance of 14.6 miles in...

  17. The Nevada railroad system: Physical, operational, and accident characteristics

    SciTech Connect

    1991-09-01

    This report provides a description of the operational and physical characteristics of the Nevada railroad system. To understand the dynamics of the rail system, one must consider the system`s physical characteristics, routing, uses, interactions with other systems, and unique operational characteristics, if any. This report is presented in two parts. The first part is a narrative description of all mainlines and major branchlines of the Nevada railroad system. Each Nevada rail route is described, including the route`s physical characteristics, traffic type and volume, track conditions, and history. The second part of this study provides a more detailed analysis of Nevada railroad accident characteristics than was presented in the Preliminary Nevada Transportation Accident Characterization Study (DOE, 1990).

  18. 21 CFR 1250.45 - Food handling facilities on railroad conveyances.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Food handling facilities on railroad conveyances. 1250.45 Section 1250.45 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... facilities on railroad conveyances. (a) Both kitchens and pantries of cars hereafter constructed...

  19. 21 CFR 1250.45 - Food handling facilities on railroad conveyances.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Food handling facilities on railroad conveyances. 1250.45 Section 1250.45 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... facilities on railroad conveyances. (a) Both kitchens and pantries of cars hereafter constructed...

  20. 77 FR 10617 - Wellsboro & Corning Railroad, LLC-Acquisition and Operation Exemption-Wellsboro & Corning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... Surface Transportation Board Wellsboro & Corning Railroad, LLC--Acquisition and Operation Exemption--Wellsboro & Corning Railroad Company Wellsboro & Corning Railroad, LLC (WCLLC), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Wellsboro & Corning Railroad Company...

  1. 76 FR 5649 - Tongue River Railroad Company, Inc.-Construction and Operation-Western Alignment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Tongue River Railroad Company, Inc.--Construction and Operation-- Western... Tongue River Railroad Company's (TRRC) application to construct and operate a rail line in...

  2. 76 FR 21425 - Rocky Mountain Railcar and Repair, Inc.-Acquisition and Operation Exemption-Line of Railroad in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-15

    ... Surface Transportation Board Rocky Mountain Railcar and Repair, Inc.--Acquisition and Operation Exemption--Line of Railroad in Tooele County, UT Rocky Mountain Railcar and Repair, Inc. (Rocky Mountain), a... line. \\1\\ Rocky Mountain states that it currently operates a railcar repair facility, but that it seeks...

  3. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Railroad operating employees in deadhead status. 220.311 Section 220.311 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic...

  4. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Railroad operating employees in deadhead status. 220.311 Section 220.311 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic...

  5. 49 CFR 220.311 - Railroad operating employees in deadhead status.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Railroad operating employees in deadhead status. 220.311 Section 220.311 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic...

  6. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Radio communications consistent with federal regulations and railroad operating rules. 220.43 Section 220.43 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD...

  7. 77 FR 27857 - Kingman Terminal Railroad, LLC-Operation Exemption-Kingman Airport Authority, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... Surface Transportation Board Kingman Terminal Railroad, LLC--Operation Exemption--Kingman Airport Authority, Inc. Kingman Terminal Railroad, LLC (KTRR), a noncarrier, has filed a verified notice of....--Continuance in Control Exemption--Kingman Terminal Railroad, LLC, Docket No. FD 35619, wherein...

  8. 77 FR 19417 - Affton Terminal Railroad Company-Operation Exemption1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ... TRANSPORTATION Surface Transportation Board Affton Terminal Railroad Company--Operation Exemption\\1\\--Affton Trucking Company Affton Terminal Railroad Company (ATRR), a noncarrier, has filed a verified notice of... related products with the Terminal Railroad Association of St. Louis and BNSF Railway Company and...

  9. 75 FR 7152 - Stillwater Central Railroad, Inc.-Lease and Operation Exemption-Hollis & Eastern Railroad L.L.C.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-17

    ... verified notice of exemption under 49 CFR 1150.41 to lease and to operate, pursuant to a lease agreement... Surface Transportation Board Stillwater Central Railroad, Inc.--Lease and Operation Exemption--Hollis... and 10 copies of all pleadings, referring to STB Finance Docket No. 35217, must be filed with...

  10. 76 FR 27173 - Carolina Coastal Railway, Inc.-Acquisition and Operation Exemption-Rocky Mount & Western Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... Surface Transportation Board Carolina Coastal Railway, Inc.--Acquisition and Operation Exemption--Rocky Mount & Western Railroad Co., Inc. d/b/a Nash County Railroad Carolina Coastal Railway, Inc. (CLNA), a... Rocky Mount & Western Railroad Co., Inc. d/b/a Nash County Railroad (NCR), and to operate,...

  11. 77 FR 74548 - Michigan Southern Railroad Company-Acquisition and Operation Exemption-RMW Ventures, LLC and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... Surface Transportation Board Michigan Southern Railroad Company--Acquisition and Operation Exemption--RMW Ventures, LLC and Maumee & Western Railroad Corporation Michigan Southern Railroad Company (MSO), a Class.... LaKemper, General Counsel, Michigan Southern Railroad Company, 1318 S. Johanson Road, Peoria, IL...

  12. 75 FR 68397 - DeQueen and Eastern Railroad, LLC-Acquisition and Operation Exemption-DeQueen and Eastern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... Surface Transportation Board DeQueen and Eastern Railroad, LLC--Acquisition and Operation Exemption--DeQueen and Eastern Railroad Company DeQueen and Eastern Railroad, LLC (DQE), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from DeQueen and Eastern Railroad Company and...

  13. 77 FR 74548 - North Shore Railroad Company-Acquisition and Operation Exemption-PPL Susquehanna, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... Surface Transportation Board North Shore Railroad Company--Acquisition and Operation Exemption--PPL Susquehanna, LLC North Shore Railroad Company (North Shore), a Class III rail carrier, has filed a verified... 26, 2011, directed PPLS to respond to additional questions about its acquisition of the Line from...

  14. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Radio communications consistent with federal... Radio and Wireless Communication Procedures § 220.43 Radio communications consistent with federal regulations and railroad operating rules. Radio communication shall not be used in connection with a railroad...

  15. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Radio communications consistent with federal... Radio and Wireless Communication Procedures § 220.43 Radio communications consistent with federal regulations and railroad operating rules. Radio communication shall not be used in connection with a railroad...

  16. 49 CFR 220.43 - Radio communications consistent with federal regulations and railroad operating rules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Radio communications consistent with federal... Radio and Wireless Communication Procedures § 220.43 Radio communications consistent with federal regulations and railroad operating rules. Radio communication shall not be used in connection with a railroad...

  17. 77 FR 65446 - Turtle Creek Industrial Railroad, Inc.-Acquisition and Operation Exemption-Consolidated Rail...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Turtle Creek Industrial Railroad, Inc.--Acquisition and Operation Exemption--Consolidated Rail Corporation Turtle Creek Industrial Railroad, Inc. (TCKR), a noncarrier and a wholly owned...

  18. 75 FR 82426 - Big Four Terminal Railroad, LLC-Operation Exemption-RMW Ventures, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Big Four Terminal Railroad, LLC--Operation Exemption--RMW Ventures, LLC Big Four Terminal Railroad, LLC (BFTR), has filed a verified notice of exemption under 49 CFR 1150.31...

  19. 78 FR 24465 - Ballard Terminal Railroad Company, L.L.C.-Acquisition and Operation Exemption-Woodinville...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ... Surface Transportation Board Ballard Terminal Railroad Company, L.L.C.--Acquisition and Operation...; request for comments. SUMMARY: On April 2, 2013, Ballard Terminal Railroad Company, L.L.C. (Ballard), a... the Line at issue here. Ballard Terminal Railroad Company, L.L.C.--Lease Exemption--Line of...

  20. 77 FR 14058 - Santa Teresa Southern Railroad, LLC-Operation Exemption-Rail Line of Verde Logistics Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ... Logistics Railroad, LLC at Santa Teresa, Dona Ana County, NM Santa Teresa Southern Railroad, LLC (STSR), a... feet of rail line owned by Verde Logistics Railroad, LLC (Verde). The rail line extends between a point... to shippers and receivers located in the Santa Teresa Logistics Industrial Park. \\1\\ STSR states that...

  1. 49 CFR 241.11 - Prohibition against conducting a railroad operation dispatched by an extraterritorial dispatcher...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... operation dispatched by an extraterritorial dispatcher; exceptions. 241.11 Section 241.11 Transportation... TRANSPORTATION UNITED STATES LOCATIONAL REQUIREMENT FOR DISPATCHING OF UNITED STATES RAIL OPERATIONS § 241.11 Prohibition against conducting a railroad operation dispatched by an extraterritorial dispatcher;...

  2. 49 CFR 241.11 - Prohibition against conducting a railroad operation dispatched by an extraterritorial dispatcher...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... operation dispatched by an extraterritorial dispatcher; exceptions. 241.11 Section 241.11 Transportation... TRANSPORTATION UNITED STATES LOCATIONAL REQUIREMENT FOR DISPATCHING OF UNITED STATES RAIL OPERATIONS § 241.11 Prohibition against conducting a railroad operation dispatched by an extraterritorial dispatcher;...

  3. 49 CFR 241.11 - Prohibition against conducting a railroad operation dispatched by an extraterritorial dispatcher...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... operation dispatched by an extraterritorial dispatcher; exceptions. 241.11 Section 241.11 Transportation... TRANSPORTATION UNITED STATES LOCATIONAL REQUIREMENT FOR DISPATCHING OF UNITED STATES RAIL OPERATIONS § 241.11 Prohibition against conducting a railroad operation dispatched by an extraterritorial dispatcher;...

  4. 49 CFR 241.11 - Prohibition against conducting a railroad operation dispatched by an extraterritorial dispatcher...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... operation dispatched by an extraterritorial dispatcher; exceptions. 241.11 Section 241.11 Transportation... TRANSPORTATION UNITED STATES LOCATIONAL REQUIREMENT FOR DISPATCHING OF UNITED STATES RAIL OPERATIONS § 241.11 Prohibition against conducting a railroad operation dispatched by an extraterritorial dispatcher;...

  5. 49 CFR 241.11 - Prohibition against conducting a railroad operation dispatched by an extraterritorial dispatcher...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... operation dispatched by an extraterritorial dispatcher; exceptions. 241.11 Section 241.11 Transportation... TRANSPORTATION UNITED STATES LOCATIONAL REQUIREMENT FOR DISPATCHING OF UNITED STATES RAIL OPERATIONS § 241.11 Prohibition against conducting a railroad operation dispatched by an extraterritorial dispatcher;...

  6. 76 FR 77890 - Swan Ranch Railroad, L.L.C.-Operation Exemption-Swan Industrial Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Swan Ranch Railroad, L.L.C.--Operation Exemption--Swan Industrial Park Swan... located within the Swan Industrial Park, in Cheyenne, Wyo. The track over which SRR will operate is...

  7. 78 FR 338 - Buckeye Hammond Railroad, L.L.C.; Acquisition and Operation Exemption; Buckeye Partners, L.P.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-03

    ...] Buckeye Hammond Railroad, L.L.C.; Acquisition and Operation Exemption; Buckeye Partners, L.P. Buckeye Hammond Railroad, L.L.C. (BHRR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 \\1\\ to acquire from Buckeye Partners, L.P., a noncarrier, and to operate approximately 6,797...

  8. 78 FR 41994 - RSL Railroad LLC-Operation Exemption-Massillon Energy & Technology Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board RSL Railroad LLC--Operation Exemption--Massillon Energy & Technology Park On... milepost 1.27 (the Line), pursuant to an agreement with Massillon Energy & Technology Park (Massillon), the...

  9. 75 FR 6790 - Nebraska Northwestern Railroad, Inc.-Acquisition and Operation Exemption-Dakota, Minnesota...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ... Surface Transportation Board Nebraska Northwestern Railroad, Inc.--Acquisition and Operation Exemption... Engineering Station 7492+73 near Dakota Junction, NE.; and (2) by lease between milepost 411.72 Engineering... pleadings, referring to STB Finance Docket No. 35346, must be filed with the Surface Transportation Board...

  10. The Role of Army Railroading at the Operational Level of War

    DTIC Science & Technology

    1989-05-15

    leaders, Gambetta and Bourbaki , hurriedly threw a plan together to take advantage of the situation. Two of Bourbaki’s corps were supposed to be shifted by...alternative is most effective and least costly in terms of labor and time delays. A second alternative is to set up transfer points to manhandle cargo between...facilities requires setting proper logistical priorities a,,d 28 recognizing the contributions railroads can make. We need to set those priorities now

  11. Designing Facilities for Collaborative Operations

    NASA Technical Reports Server (NTRS)

    Norris, Jeffrey; Powell, Mark; Backes, Paul; Steinke, Robert; Tso, Kam; Wales, Roxana

    2003-01-01

    A methodology for designing operational facilities for collaboration by multiple experts has begun to take shape as an outgrowth of a project to design such facilities for scientific operations of the planned 2003 Mars Exploration Rover (MER) mission. The methodology could also be applicable to the design of military "situation rooms" and other facilities for terrestrial missions. It was recognized in this project that modern mission operations depend heavily upon the collaborative use of computers. It was further recognized that tests have shown that layout of a facility exerts a dramatic effect on the efficiency and endurance of the operations staff. The facility designs (for example, see figure) and the methodology developed during the project reflect this recognition. One element of the methodology is a metric, called effective capacity, that was created for use in evaluating proposed MER operational facilities and may also be useful for evaluating other collaboration spaces, including meeting rooms and military situation rooms. The effective capacity of a facility is defined as the number of people in the facility who can be meaningfully engaged in its operations. A person is considered to be meaningfully engaged if the person can (1) see, hear, and communicate with everyone else present; (2) see the material under discussion (typically data on a piece of paper, computer monitor, or projection screen); and (3) provide input to the product under development by the group. The effective capacity of a facility is less than the number of people that can physically fit in the facility. For example, a typical office that contains a desktop computer has an effective capacity of .4, while a small conference room that contains a projection screen has an effective capacity of around 10. Little or no benefit would be derived from allowing the number of persons in an operational facility to exceed its effective capacity: At best, the operations staff would be underutilized

  12. 78 FR 9450 - Grand Trunk Western Railroad Company-Acquisition of Operating Easement-CSX Transportation, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-08

    ... Surface Transportation Board Grand Trunk Western Railroad Company--Acquisition of Operating Easement--CSX... Company's Corwith Yard. The Board is separately granting authority for CSXT's acquisition of this.... 11323-25 for Grand Trunk Western Railroad Company (GTW), an indirect, wholly owned subsidiary of...

  13. 75 FR 16005 - Drawbridge Operation Regulation; Port of Coos Bay Railroad Bridge, Coos Bay, North Bend, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... Railroad Bridge, Coos Bay, North Bend, OR AGENCY: Coast Guard, DHS. ACTION: Final rule. SUMMARY: The Coast Guard is changing the drawbridge operation regulation for the Coos Bay Railroad Bridge, Coos Bay, mile 9... bridge consistent with other bridges in the area and to eliminate the unnecessary special sound signals...

  14. 76 FR 13446 - Nittany Bald and Eagle Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... Surface Transportation Board Nittany Bald and Eagle Railroad Company-Operation Exemption-SEDA- COG Joint Rail Authority Nittany Bald and Eagle Railroad Company (N&BE), a Class III carrier, has filed a... the Board in Susquehanna Union R.R.-Control Exemption- N. Shore R.R., Nittany & Bald Eagle R.R...

  15. 76 FR 42163 - East Penn Railroad, L.L.C.; Lease and Operation Exemption; Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board East Penn Railroad, L.L.C.; Lease and Operation Exemption; Norfolk Southern.... East Penn Railroad, L.L.C. (ESPN), a Class III rail carrier, has filed a verified notice of...

  16. 78 FR 802 - Heart of Texas Railroad, L.P.-Acquisition and Operation Exemption-Gulf Colorado & San Saba...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... Surface Transportation Board Heart of Texas Railroad, L.P.--Acquisition and Operation Exemption--Gulf Colorado & San Saba Railway Company Heart of Texas Railroad, L.P. (the Company), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Gulf Colorado & San Saba Railway...

  17. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad, if... carrier by railroad, or to the receipt, delivery, elevation, transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad....

  18. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad, if... carrier by railroad, or to the receipt, delivery, elevation, transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad....

  19. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad, if... carrier by railroad, or to the receipt, delivery, elevation, transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad....

  20. 77 FR 72907 - Western Washington Railroad, LLC-Lease and Operation Exemption-City of Tacoma, Department of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ...-- City of Tacoma, Department of Public Works On November 20, 2012, Western Washington Railroad, LLC (WWRR... CFR 1150.31 to lease from the City of Tacoma, Department of Public Works (Tacoma Rail) and operate 7.6...

  1. 76 FR 75600 - Port Rail Link, Inc.-Acquisition and Operation Exemption-Rail Lines of Union Pacific Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... Union Pacific Railroad Company and The Lake Charles Harbor and Terminal District Port Rail Link, Inc... Harbor and Terminal District (the District), operator ] of the Port of Lake Charles (the Port),...

  2. Effect of geomagnetic disturbances on the operation of railroad automated mechanisms and telemechanics

    NASA Astrophysics Data System (ADS)

    Kasinskii, V. V.; Ptitsyna, N. G.; Lyahov, N. N.; Tyasto, M. I.; Villoresi, G.; Iucci, N.

    2007-10-01

    Geomagnetic variations generate electric currents in long conductors such as high-voltage lines, pipelines, and telecoms cables. The aim of our work is to study the possible effect of geomagnetic disturbances on the operation of automated systems and telemechanics of a midlatitude railroad based on the data on the malfunctions and breakdowns registered in 2004 on the East Siberian railroad (VSZhD). It has been obtained that the total daily duration of malfunctions and breakdowns ( T) during disturbed periods is controlled by geomagnetic activity. When a peak of geomagnetic activity is reached during a storm, T increases about three times. Moreover, a correlation between T and the local index of geomagnetic activity ( A), measured at Podkamennaya Tunguska Siberian observatory, is high during disturbed periods. Specifically, the correlation coefficient ( K) is equal to 0.83 and 0.71 for the strongest two storms of 2004 that occurred in July 17-August 2 and November 4-18, respectively.

  3. Facility design, construction, and operation

    SciTech Connect

    1995-04-01

    France has been disposing of low-level radioactive waste (LLW) at the Centre de Stockage de la Manche (CSM) since 1969 and now at the Centre de Stockage de l`Aube (CSA) since 1992. In France, several agencies and companies are involved in the development and implementation of LLW technology. The Commissariat a l`Energie Atomic (CEA), is responsible for research and development of new technologies. The Agence National pour la Gestion des Dechets Radioactifs is the agency responsible for the construction and operation of disposal facilities and for wastes acceptance for these facilities. Compagnie Generale des Matieres Nucleaires provides fuel services, including uranium enrichment, fuel fabrication, and fuel reprocessing, and is thus one generator of LLW. Societe pour les Techniques Nouvelles is an engineering company responsible for commercializing CEA waste management technology and for engineering and design support for the facilities. Numatec, Inc. is a US company representing these French companies and agencies in the US. In Task 1.1 of Numatec`s contract with Martin Marietta Energy Systems, Numatec provides details on the design, construction and operation of the LLW disposal facilities at CSM and CSA. Lessons learned from operation of CSM and incorporated into the design, construction and operating procedures at CSA are identified and discussed. The process used by the French for identification, selection, and evaluation of disposal technologies is provided. Specifically, the decisionmaking process resulting in the change in disposal facility design for the CSA versus the CSM is discussed. This report provides` all of the basic information in these areas and reflects actual experience to date.

  4. 75 FR 49549 - ABC & D Recycling, Inc.-Lease and Operation Exemption-a Line of Railroad in Ware, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... Surface Transportation Board ABC & D Recycling, Inc.--Lease and Operation Exemption--a Line of Railroad in Ware, MA ABC & D Recycling, Inc. (ABC & D), a noncarrier, has filed a verified notice of exemption... operation of this trackage in FD 35356, ABC & D Recycling, Inc.--Lease and Operation Exemption--a Line of...

  5. 75 FR 45011 - Gardendale Railroad, Inc.-Operation Exemption-Rail Line of Border Transload & Transfer, Inc. at...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... line of railroad and TRS received an exemption to lease and operate the line. See Crystal City R.R.--Acquisition and Operation Exemption--R.R. Switching Service of Missouri, Texas R.R. Switching--Lease and Operation Exemption--Crystal City R.R., FD 31757 (served Nov. 15, 1990). In 1995, CCR was authorized...

  6. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad, if... carrier by railroad, or to the receipt, delivery, elevation, transfer in transit, refrigeration or...

  7. 20 CFR 202.7 - Service or operation in connection with railroad transportation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., transfer in transit, refrigeration or icing, storage, or handling of property transported by railroad, if... carrier by railroad, or to the receipt, delivery, elevation, transfer in transit, refrigeration or...

  8. PROJECTIZING AN OPERATING NUCLEAR FACILITY

    SciTech Connect

    Adams, N

    2007-07-08

    This paper will discuss the evolution of an operations-based organization to a project-based organization to facilitate successful deactivation of a major nuclear facility. It will describe the plan used for scope definition, staff reorganization, method estimation, baseline schedule development, project management training, and results of this transformation. It is a story of leadership and teamwork, pride and success. Workers at the Savannah River Site's (SRS) F Canyon Complex (FCC) started with a challenge--take all the hazardous byproducts from nearly 50 years of operations in a major, first-of-its-kind nuclear complex and safely get rid of them, leaving the facility cold, dark, dry and ready for whatever end state is ultimately determined by the United States Department of Energy (DOE). And do it in four years, with a constantly changing workforce and steadily declining funding. The goal was to reduce the overall operating staff by 93% and budget by 94%. The facilities, F Canyon and its adjoined sister, FB Line, are located at SRS, a 310-square-mile nuclear reservation near Aiken, S.C., owned by DOE and managed by Washington Group International subsidiary Washington Savannah River Company (WSRC). These facilities were supported by more than 50 surrounding buildings, whose purpose was to provide support services during operations. The radiological, chemical and industrial hazards inventory in the old buildings was significant. The historical mission at F Canyon was to extract plutonium-239 and uranium-238 from irradiated spent nuclear fuel through chemical processing. FB Line's mission included conversion of plutonium solutions into metal, characterization, stabilization and packaging, and storage of both metal and oxide forms. The plutonium metal was sent to another DOE site for use in weapons. Deactivation in F Canyon began when chemical separations activities were completed in 2002, and a cross-functional project team concept was implemented to successfully

  9. 78 FR 25784 - Keenesburg Direct Railroad, LLC-Acquisition and Operation Exemption-J D East, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Keenesburg Direct Railroad, LLC--Acquisition and Operation Exemption--J D... under 49 CFR 1150.31 to acquire from J D East, LLC (JDE), and to operate, approximately 0.16 miles...

  10. 78 FR 4981 - Pacific Imperial Railroad, Inc.-Change in Operator Exemption-Rail Line of San Diego and Arizona...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ... San Diego and Arizona Eastern Railway Company Pacific Imperial Railroad, Inc. (PIR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to change operators from San Diego & Imperial... SD&AE and its parent, San Diego Metropolitan Transit Development Board. This change in operators is...

  11. National facilities study. Volume 4: Space operations facilities task group

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The principal objectives of the National Facilities Study (NFS) were to: (1) determine where U.S. facilities do not meet national aerospace needs; (2) define new facilities required to make U.S. capabilities 'world class' where such improvements are in the national interest; (3) define where consolidation and phase-out of existing facilities is appropriate; and (4) develop a long-term national plan for world-class facility acquisition and shared usage. The Space Operations Facilities Task Group defined discrete tasks to accomplish the above objectives within the scope of the study. An assessment of national space operations facilities was conducted to determine the nation's capability to meet the requirements of space operations during the next 30 years. The mission model used in the study to define facility requirements is described in Volume 3. Based on this model, the major focus of the Task Group was to identify any substantive overlap or underutilization of space operations facilities and to identify any facility shortfalls that would necessitate facility upgrades or new facilities. The focus of this initial study was directed toward facility recommendations related to consolidations, closures, enhancements, and upgrades considered necessary to efficiently and effectively support the baseline requirements model. Activities related to identifying facility needs or recommendations for enhancing U.S. international competitiveness and achieving world-class capability, where appropriate, were deferred to a subsequent study phase.

  12. 78 FR 13932 - Yellowstone Valley Railroad, L.L.C.-Discontinuance of Lease and Trackage Rights Operations...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Yellowstone Valley Railroad, L.L.C.--Discontinuance of Lease and Trackage Rights Operations Exemption--In Richland, Sheridan, Roosevelt, and Daniels Counties, Mont., and...

  13. 75 FR 11991 - ABC & D Recycling, Inc.-Lease and Operation Exemption-a Line of Railroad in Ware, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board ABC & D Recycling, Inc.--Lease and Operation Exemption--a Line of Railroad in Ware, MA ABC & D Recycling, Inc. (ABC & D), a noncarrier, has filed a verified notice of exemption...

  14. 75 FR 61817 - Jackson & Lansing Railroad Company-Lease and Operation Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ... Surface Transportation Board Jackson & Lansing Railroad Company--Lease and Operation Exemption--Norfolk... NSR's engineering maps. JAIL certifies that the projected annual revenues as a result of the proposed... original and 10 copies of all pleadings, referring to Docket No. FD 35411, must be filed with the Surface...

  15. 78 FR 24803 - Hilco SP Rail, LLC-Acquisition and Operation Exemption-RG Steel Railroad Holding, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Hilco SP Rail, LLC--Acquisition and Operation Exemption--RG Steel Railroad... original and 10 copies of all pleadings, referring to Docket No. FD 35734, must be filed with the...

  16. 78 FR 54955 - Mississippi Central Railroad Co.-Lease and Change in Operators Exemption-Line of Mississippi...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... rail carrier, has filed a verified notice of exemption under 49 CFR 1150.41 to lease and operate a 41.5-mile line of railroad between milepost IC-529.5 (Corinth, Miss.) and milepost IC-571.0 (Red Bay, Ala.), in Alcorn, Prentiss, Tishomingo, and Itawamba Counties, Miss., and Franklin County, Ala. (the...

  17. 75 FR 74768 - Madison Terminal Railway, LLC-Lease and Operation Exemption-Line of Railroad in Dane County, WI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Madison Terminal Railway, LLC--Lease and Operation Exemption-- Line of Railroad in Dane County, WI Madison Terminal Railway, LLC (MTR), a noncarrier, has filed a verified...

  18. 78 FR 54955 - Indiana Eastern Railroad, LLC, d/b/a Ohio South Central Railroad-Change in Operators Exemption...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... Operators Exemption--Rail Lines of the City of Jackson, Ohio, in Jackson, Vinton, and Ross Counties, Ohio...): (1) From milepost 91.6 at RA Junction near Richmond Dale, Ross County, to milepost 95.5 at West Junction, Ross County; (2) from milepost 112.3 at West Junction to milepost 127.5 near Hamden,...

  19. 78 FR 36017 - MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad-Operation Exemption-Hilco SP Rail, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad-- Operation Exemption--Hilco SP Rail, LLC MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad (MCM), a noncarrier...

  20. Data Management Facility Operations Plan

    SciTech Connect

    Keck, Nicole N

    2014-06-30

    The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.

  1. 49 CFR 218.39 - Hump operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Protection of Trains and Locomotives § 218.39 Hump operations. After June 30, 1984, each railroad that operates a remote control hump yard facility must have...

  2. Plans for National Ignition Facility operations training and operations procedures

    SciTech Connect

    Mantrom, D.D., LLNL

    1998-06-01

    A preliminary plan for National Ignition Facility (NIF) Operations training developed for the 200+ staff anticipated to operate the NIF facility is discussed. We also address the development and implementation of NIF Operations procedures. These procedures serve as an essential part of the staff training program. A special aspect of NIF Operations procedures is that they will be on-line with electronic links to design, operations, and test databases, and will likely incorporate electronic checklists and archiving capabilities.

  3. Operations on the National Ignition Facility

    SciTech Connect

    Brereton, Sandra J.; Burr, Robert F.; Folta, Peg; Keane, Christopher J.; Kohut, Thomas R.; Merritt, Bernard T.; Van Wonterghem, Bruno M.

    2014-03-24

    The National Ignition Facility (NIF) is a fully operational high energy density physics experimental user facility that focuses 192 laser beams onto a small target at the center of a target chamber. This paper describes how we execute experimental shots on the NIF, both from the user perspective and from the facility perspective. We review the planning processes and tools used to facilitate operations. Safety and radiological aspects of NIF’s operations are discussed. We also describe efforts to continuously improve operations and further increase shot rate.

  4. Operations on the National Ignition Facility

    DOE PAGES

    Brereton, Sandra J.; Burr, Robert F.; Folta, Peg; ...

    2014-03-24

    The National Ignition Facility (NIF) is a fully operational high energy density physics experimental user facility that focuses 192 laser beams onto a small target at the center of a target chamber. This paper describes how we execute experimental shots on the NIF, both from the user perspective and from the facility perspective. We review the planning processes and tools used to facilitate operations. Safety and radiological aspects of NIF’s operations are discussed. We also describe efforts to continuously improve operations and further increase shot rate.

  5. Operating procedures: Fusion Experiments Analysis Facility

    SciTech Connect

    Lerche, R.A.; Carey, R.W.

    1984-03-20

    The Fusion Experiments Analysis Facility (FEAF) is a computer facility based on a DEC VAX 11/780 computer. It became operational in late 1982. At that time two manuals were written to aid users and staff in their interactions with the facility. This manual is designed as a reference to assist the FEAF staff in carrying out their responsibilities. It is meant to supplement equipment and software manuals supplied by the vendors. Also this manual provides the FEAF staff with a set of consistent, written guidelines for the daily operation of the facility.

  6. Cooperative operation of urban drainage facilities

    NASA Astrophysics Data System (ADS)

    Kim, Joong Hoon; Lee, Eui Hoon; Lim, Osung; Jung, Donghwi

    2017-04-01

    Management of drainage facilities is an important factor in urban flooding. In the past, structural management including the installation of additional drainage facilities have been adopted to prevent urban flooding as a main policy although it is costly and time consuming. Non-structural management such as effective operation of drainage facilities is necessary to raise the flood mitigation efficiency. In this study, a new type of management, cooperative operation for urban drainage facilities including pump stations and detention reservoirs, is suggested. A novel cooperative operating management is proposed as a nonstructural management. The proposed operational management are demonstrated in the Daerim sewer network in Seoul, South Korea with a detention reservoir at the upstream of the study network and a pump station at the downstream. The new cooperative operation is based on sharing water level information at monitoring nodes and controlling drainage pumps. Results describe that flood reduction by the management of cooperative operation are better than the management of current operation. All results related to flood reduction by the cooperative operation are superior to those by the current operation. Key words: Urban flooding, Pump station, Detention reservoir, Cooperative operation, Urban drainage facilities

  7. Operation and Maintenance of Wastewater Treatment Facilities.

    ERIC Educational Resources Information Center

    Drury, Douglas D.

    1978-01-01

    Presents the 1978 literature review of wastewater treatment: (1) operators, training, and certification; (2) solutions to operating problems; (3) collection systems; (4) operations manuals; (5) wastewater treatment facility case histories; (5) land application; and (6) treatment of industrial wastes. A list of 36 references is also presented. (HM)

  8. Operation and Maintenance of Wastewater Treatment Facilities.

    ERIC Educational Resources Information Center

    Drury, Douglas D.

    1978-01-01

    Presents the 1978 literature review of wastewater treatment: (1) operators, training, and certification; (2) solutions to operating problems; (3) collection systems; (4) operations manuals; (5) wastewater treatment facility case histories; (5) land application; and (6) treatment of industrial wastes. A list of 36 references is also presented. (HM)

  9. APPA's New Operational Guidelines for Educational Facilities

    ERIC Educational Resources Information Center

    Bigger, Alan S.

    2011-01-01

    Nearly 25 years ago a group of APPA members and facilities managers started to discuss an idea and to plant a seed about the need for a document, or series of documents, that would explain the need for staffing facilities operations and the implication of such staffing on levels of service. As the demand for increased budget cuts reached seismic…

  10. Shoreham Railroad Bridge, Former Addison County Railroad (later, Rutland Railroad, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Shoreham Railroad Bridge, Former Addison County Railroad (later, Rutland Railroad, Addison Branch), spanning Lemon Fair River above Richville Pond, west of East Shoreham Road, Shoreham, Addison County, VT

  11. School Facilities Maintenance and Operations.

    ERIC Educational Resources Information Center

    Association of School Business Officials of the United States and Canada, Park Ridge, IL. Research Corp.

    This publication presents a series of field-proven school energy conservation, management, maintenance, and operations practices and ideas. Also included are the names, addresses, and phone numbers of individuals and organizations to contact for more detailed information. The brief summaries are grouped into six sections. "Planning and…

  12. Space Station tethered refueling facility operations

    NASA Technical Reports Server (NTRS)

    Kiefel, E. R.; Rudolph, L. K.; Fester, D. A.

    1986-01-01

    The space-based orbital transfer vehicle will require a large cryogenic fuel storage facility at the Space Station. An alternative to fuel storage onboard the Space Station, is on a tethered orbital refueling facility (TORF) which is separated from the Space Station by a sufficient distance to induce a gravity gradient to settle the propellants. Facility operations are a major concern associated with a tethered LO2/LH2 storage depot. A study was carried out to analyze these operations so as to identify the preferred TORF deployment direction (up or down) and whether the TORF should be permanently or intermittently deployed. The analyses considered safety, contamination, rendezvous, servicing, transportation rate, communication, and viewing. An upwardly, intermittently deployed facility is the preferred configuration for a tethered cryogenic fuel storage.

  13. 75 FR 63532 - Lancaster & Chester Railroad, LLC-Acquisition and Operation Exemption-Line of Lancaster & Chester...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... Linda C. Claussen--Continuance in Control Exemption--Lancaster & Chester Railroad, LLC, wherein the above parties seek to continue in control of L&C Railroad, upon L&C Railroad's becoming a Class III rail... served on Troy W. Garris, 2904 Corporate Cir., Flower Mound, TX. 75028. Board decisions and notices are...

  14. Defense Waste Processing Facility -- Radioactive operations -- Part 3 -- Remote operations

    SciTech Connect

    Barnes, W.M.; Kerley, W.D.; Hughes, P.D.

    1997-06-01

    The Savannah River Site`s Defense Waste Processing Facility (DWPF) near Aiken, South Carolina is the nation`s first and world`s largest vitrification facility. Following a ten year construction period and nearly three years of non-radioactive testing, the DWPF began radioactive operations in March 1996. Radioactive glass is poured from the joule heated melter into the stainless steel canisters. The canisters are then temporarily sealed, decontaminated, resistance welded for final closure, and transported to an interim storage facility. All of these operations are conducted remotely with equipment specially designed for these processes. This paper reviews canister processing during the first nine months of radioactive operations at DWPF. The fundamental design consideration for DWPF remote canister processing and handling equipment are discussed as well as interim canister storage.

  15. Defense waste processing facility radioactive operations. Part 1 - operating experience

    SciTech Connect

    Little, D.B.; Gee, J.T.; Barnes, W.M.

    1997-12-31

    The Savannah River Site`s Defense Waste Processing Facility (DWPF) near Aiken, SC is the nation`s first and the world`s largest vitrification facility. Following a ten year construction program and a 3 year non-radioactive test program, DWPF began radioactive operations in March 1996. This paper presents the results of the first 9 months of radioactive operations. Topics include: operations of the remote processing equipment reliability, and decontamination facilities for the remote processing equipment. Key equipment discussed includes process pumps, telerobotic manipulators, infrared camera, Holledge{trademark} level gauges and in-cell (remote) cranes. Information is presented regarding equipment at the conclusion of the DWPF test program it also discussed, with special emphasis on agitator blades and cooling/heating coil wear. 3 refs., 4 figs.

  16. 75 FR 47678 - Northern Plains Railroad, Inc.-Lease Exemption-Soo Line Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... Surface Transportation Board Northern Plains Railroad, Inc.--Lease Exemption--Soo Line Railroad Company... notice of lease and operation exemption should be issued, and does so here. Northern Plains Railroad, Inc... its lease of approximately 290.31 miles of rail line of Soo Line Railroad Company, d/b/a...

  17. Recent operational experiments at the LANSCE facility

    SciTech Connect

    Rybarcyk, Lawrence J

    2010-09-15

    The Los Alamos Neutron Science Center (LANSCE) consists of a pulsed 800-MeV room-temperature linear accelerator and an 800-MeV accumulator ring. It simultaneously provides H{sup +} and H{sup -} beams to several user facilities that have their own distinctive requirements, e.g. intensity, chopping pattern, duty factor, etc.. This multibeam operation presents challenges both from the standpoint of meeting the individual requirements but also achieving good overall performance for the integrated operation. Various aspects of more recent operations including the some of these challenges will be discussed.

  18. 77 FR 18881 - North Louisiana & Arkansas Railroad, Inc.-Lease and Operation Exemption-Line of Southeastern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-28

    ...--Line of Southeastern Arkansas Economic Development District North Louisiana & Arkansas Railroad, Inc... from Southeastern Arkansas Economic Development District (SAEDD), a noncarrier political subdivision...

  19. 75 FR 25310 - Port Harbor Railroad, Inc.-Lease and Operation Exemption-Line of Tri-City Regional Port District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... Surface Transportation Board Port Harbor Railroad, Inc.--Lease and Operation Exemption--Line of Tri-City... of exemption under 49 CFR 1150.31 to lease from Tri- City Regional Port District (Tri-City), and to... as a result of this transaction will not exceed $5 million. According to Port Harbor, Tri-City is not...

  20. 77 FR 30588 - R.J. Corman Railroad Company/Pennsylvania Lines Inc.-Construction and Operation Exemption-In...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board R.J. Corman Railroad Company/Pennsylvania Lines Inc.-- Construction and... prior approval requirements of 49 U.S.C. 10901 for R.J. Corman Railroad Company/Pennsylvania Lines...

  1. 76 FR 75602 - Hilton & Albany Railroad, Inc.-Lease and Operation Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ...-- Norfolk Southern Railway Company Hilton & Albany Railroad, Inc. (HAL), a noncarrier, has filed a verified... approximately 55.5 miles of railroad extending between milepost J 302.3 near Albany West, Ga., and milepost J... control of HAL upon HAL's becoming a Class III carrier. As a result of this transaction, and pursuant to a...

  2. Lunar launch and landing facilities and operations

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The Florida Institute of Technology established an Interdisciplinary Design Team to design a lunar based facility whose primary function involves launch and landing operations for future moon missions. Both manned and unmanned flight operations were considered in the study with particular design emphasis on the utilization (or reutilization) of all materials available on the moon. This resource availability includes man-made materials which might arrive in the form of expendable landing vehicles as well as in situ lunar minerals. From an engineering standpoint, all such materials are considered as to their suitability for constructing new lunar facilities and/or repairing or expanding existing structures. Also considered in this design study was a determination of the feasibility of using naturally occurring lunar materials to provide fuel components to support lunar launch operations. Conventional launch and landing operations similar to those used during the Apollo Program were investigated as well as less conventional techniques such as rail guns and electromagnetic mass drivers. The Advanced Space Design team consisted of students majoring in Physics and Space Science as well as Electrical, Mechanical, Chemical and Ocean Engineering.

  3. Operating manual for the Tower Shielding Facility

    SciTech Connect

    Not Available

    1985-12-01

    This manual provides information necessary to operate and perform maintenance on the reactor systems and all equipment or systems which can affect their operation or the safety of personnel at the Tower Shielding Facility. The first four chapters consist of introductory and descriptive material of benefit to personnel in training, the qualifications required for training, the responsibilities of the personnel in the organization, and the procedures for reviewing proposed experiments. Chapter 8, Emergency Procedures, is also a necessary part of the indoctrination of personnel. The procedures for operation of the Tower Shielding Reactor (TSR-II), its water cooling system, and the main tower hoists are outlined in Chapters 5, 6, and 7. The Technical Specification surveillance requirements for the TSR-II are summarized in Chapter 9. The maintenance and calibration schedule is spelled out in Chapter 10. The procedures for assembly and disassembly of the TSR-II are outlined in Chapter 11.

  4. Integrated safeguards and facility design and operations

    SciTech Connect

    Tape, J.W.; Coulter, C.A.; Markin, J.T.; Thomas, K.E.

    1987-01-01

    The integration of safeguards functions to deter or detect unauthorized actions by insiders requires careful communication and management of safeguards-relevant information on a timely basis. The separation of safeguards functions into physical protection, materials control, and materials accounting often inhibits important information flows. Redefining the major safeguards functions as authorization, enforcement, and verification and careful attention to management of information can result in effective safeguards integration. Whether designing new systems or analyzing existing ones, understanding the interface between facility operations and safeguards is critical to cost-effective integrated safeguards systems that meet modern standards of performance.

  5. Fuel Supply Shutdown Facility Interim Operational Safety Requirements

    SciTech Connect

    BENECKE, M.W.

    2000-09-06

    The Interim Operational Safety Requirements for the Fuel Supply Shutdown (FSS) Facility define acceptable conditions, safe boundaries, bases thereof, and management of administrative controls to ensure safe operation of the facility.

  6. Operations experience at the Bevalac radiotherapy facility

    SciTech Connect

    Alonso, J.R.; Criswell, T.L.; Howard, J.; Chu, W.T.; Singh, R.P.; Geller, D.; Nyman, M.

    1981-03-01

    During the first years of Bevalac operation the biomedical effort concentrated on radiobiology work, laying the foundation for patient radiotherapy. A dedicated radiotherapy area was created in 1978, and in 1979 full-scale patient treatment was begun. As of now over 500 treatments with carbon, neon and argon beams have been delivered to about 50 patients, some as boosts from other modalities and some as complete heavy ion treatments. Up to 12 patients per day have been treated in this facility. Continuing efforts in refining techniques and operating procedures are increasing efficiency and accuracy of treatments, and are contributing to the alleviation of scheduling difficulties caused by the unique requirements of radiotherapy with human patients.

  7. Operation of the TRIUMF Proton Therapy Facility.

    NASA Astrophysics Data System (ADS)

    Blackmore, E. W.; Evans, B.; Mouat, M.; Duzenli, C.; Ma, R.; Pickles, T.; Paton, K.

    1997-05-01

    The Proton Therapy Facility at TRIUMF is now in routine operation treating ocular tumours using 70 MeV protons extracted from the 500 MeV H^- cyclotron. This paper describes the proton beam line, treatment control, and dosimetry systems which are designed to provide accurate therapeutic dose delivery. The reproducibility of the shape and range of the unmodulated Bragg peak for various operating conditions of the cyclotron is discussed, along with the technique for producing a uniform modulated or spread-out Bragg peak. The patient positioning chair, which has six motorized degrees of freedom, the patient mask and bite-block, and the X-ray verification system ensure sub-millimeter positioning accuracy. Patient treatments are scheduled one week per month with the treatment dose of 50 proton-Gy delivered in four daily fractions.

  8. 49 CFR 218.39 - Hump operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... operations. After June 30, 1984, each railroad that operates a remote control hump yard facility must have in... apply a locking or blocking device to the control for that switch; and (c) The operator shall then...

  9. 76 FR 22749 - Camden & Southern Railroad, Inc.-Lease and Operation Exemption-Camden Area Industrial Development...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... Industrial Development Corporation Camden & Southern Railroad, Inc. (C&S), a noncarrier, has filed a verified... Area Industrial Development Corporation (CAIDC), located at Zone JH482, Yard 06, opposite milepost 463...

  10. 75 FR 1447 - Alaska Railroad Corporation-Construction and Operation Exemption-Rail Line Between North Pole and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... Between North Pole and Delta Junction, AK By petition filed on July 6, 2007, Alaska Railroad Corporation... side of the community of Delta Junction. In a decision served on October 4, 2007, the Board...

  11. 76 FR 13445 - North Shore Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... operating agreement between SEDA-COG and NSRR has recently been filed at the Board in Susquehanna Union R.R.-Control Exemption- N. Shore R.R., Nittany & Bald Eagle R.R., Shamokin Valley R.R., Juniata Valley R.R., Lycoming Valley R.R., and Union Cnty. Indus. R.R., FD 35343, Pet. for Exemption Ex.......

  12. 76 FR 22746 - Wiregrass Central Railway, LLC-Acquisition and Operation Exemption-Wiregrass Central Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... milepost 821.2 near Newton, in Coffee and Dale Counties, Ala.\\1\\ \\1\\ WCR is acquiring the line from WGCR as... County, Ala.; and Docket No. FD 35488, Three Notch Railway, LLC--Acquisition and Operation Exemption... interchange point with CSX Transportation, Inc., in Georgiana, Ala., and milepost 581.3 at Andalusia, Ala....

  13. 77 FR 27857 - Columbus & Chattahoochee Railroad, Inc.-Lease and Operation Exemption-Norfolk Southern Railway...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... operate 25.50 miles of rail line consisting of two segments: (1) Between milepost S 292.8 near Girard, Ala., and milepost S 303.9 near Nuckols, Ala., a distance of 11.10 miles; and (2) between milepost NU 0 near Nuckols and milepost NU 14.4 near Mahrt, Ala., a distance of 14.40 miles (collectively, the line)....

  14. 49 CFR 840.3 - Notification of railroad accidents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Notification of railroad accidents. 840.3 Section... SAFETY BOARD RULES PERTAINING TO NOTIFICATION OF RAILROAD ACCIDENTS § 840.3 Notification of railroad accidents. The operator of a railroad shall notify the Board by telephoning the National Response Center...

  15. 49 CFR 840.3 - Notification of railroad accidents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Notification of railroad accidents. 840.3 Section... SAFETY BOARD RULES PERTAINING TO NOTIFICATION OF RAILROAD ACCIDENTS § 840.3 Notification of railroad accidents. The operator of a railroad shall notify the Board by telephoning the National Response Center...

  16. 49 CFR 840.3 - Notification of railroad accidents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Notification of railroad accidents. 840.3 Section... SAFETY BOARD RULES PERTAINING TO NOTIFICATION OF RAILROAD ACCIDENTS § 840.3 Notification of railroad accidents. The operator of a railroad shall notify the Board by telephoning the National Response Center...

  17. 49 CFR 840.3 - Notification of railroad accidents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Notification of railroad accidents. 840.3 Section... SAFETY BOARD RULES PERTAINING TO NOTIFICATION OF RAILROAD ACCIDENTS § 840.3 Notification of railroad accidents. The operator of a railroad shall notify the Board by telephoning the National Response Center...

  18. 200 Area treated effluent disposal facility operational test report

    SciTech Connect

    Crane, A.F.

    1995-03-01

    This document reports the results of the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These completed operational testing activities demonstrated the functional, operational and design requirements of the 200 Area TEDF have been met.

  19. 75 FR 7537 - Elkhart & Western Railroad Co.-Lease and Operation Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... Chicago District). \\1\\ See Pioneer Railcorp and Michigan Southern Railroad Company--Corporate Family Transaction Exemption, STB Finance Docket No. 33941 (STB served Oct. 10, 2000). \\2\\ EWR states that it has... and 10 copies of all pleadings, referring to STB Finance Docket No. 35347, must be filed with the...

  20. The Effects of Railroads on the Emergence of Operational Art During the American Civil War, 1861-1865

    DTIC Science & Technology

    2013-05-23

    L&N Railroad in the Civil War: A Vital North–South Link and the Struggle to Control It. Jefferson: McFarland & Company, 2011. Lord, Francis A...Battlefield 1861-1863. Amherst: Prometheus Books, 2008. Reynolds, Paul Davidson. A Primer in Theory Construction. Boston: Allyn and Bacon Classics

  1. 77 FR 49863 - Pacific Imperial Railroad, Inc.-Change in Operator Exemption-Rail Line of San Diego and Arizona...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-17

    ... San Diego and Arizona Eastern Railway Company Pacific Imperial Railroad, Inc. (PIR), a noncarrier, has... is owned by San Diego and Arizona Eastern Railway Company (SD&AE). The agreement provides for a... Line to PIR, with the consent of SD&AE, its parent, San Diego Metropolitan Transit Development Board...

  2. 75 FR 68399 - Lancaster & Chester Railroad, LLC-Acquisition and Operation Exemption-Line of Lancaster & Chester...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... of Lancaster & Chester Railway Company AGENCY: Surface Transportation Board, DOT. ACTION: Correction to Notice of Exemption. SUMMARY: This document contains a correction to the Notice of Exemption... correction relates to the name of the connecting railroad in the description of the rail line. The...

  3. 47 CFR 73.1615 - Operation during modification of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Operation during modification of facilities. 73... modification of facilities. When the licensee of an existing AM, FM, TV or Class A TV station is in the process of modifying existing facilities as authorized by a construction permit and determines it is...

  4. Operational Safety Requirements Neutron Multiplier Facility in 329 Building

    SciTech Connect

    EA. Lepel

    1992-10-01

    The operational safety requirements (OSRs) presented in this report define the conditions, safe boundaries and management control needed for safely operating the Neutron Multiplier Facility in the 329 Building Annex.

  5. A permanent space reactor operations, training, and planning facility

    SciTech Connect

    Wilson, C.E.; Dutt, D.S. )

    1991-01-10

    This paper is an overview of how future deployment of space reactors would be supported by an operating space reactor ground facility. Such a facility would be used to train ground controllers, mission planners, and flight crews. Operating procedures, planning for off-normal contingencies, and in-flight reprogramming would be generated at such a facility. To avoid communication time delays, reactor operating trends would be established to allow ground controllers to spot a potential problem. The ongoing efforts at the Hanford Ground Engineering System Test Site could play an important supporting role in establishing a permanent space reactor facility.

  6. A study of the operation of selected national research facilities

    NASA Technical Reports Server (NTRS)

    Eisner, M.

    1974-01-01

    The operation of national research facilities was studied. Conclusions of the study show that a strong resident scientific staff is required for successful facility operation. No unique scheme of scientific management is revealed except for the obvious fact that the management must be responsive to the users needs and requirements. Users groups provide a convenient channel through which these needs and requirements are communicated.

  7. Defense Waste Processing Facility radioactive operations -- Part 2, Glass making

    SciTech Connect

    Carter, J.T.; Rueter, K.J.; Ray, J.W.; Hodoh, O.

    1996-12-31

    The Savannah River Site`s Defense Waste Processing Facility (DWPF) near Aiken, SC is the nation`s first and world`s largest vitrification facility. Following a ten year construction period and nearly 3 year non-radioactive test program, the DWPF began radioactive operations in March, 1996. The results of the first 8 months of radioactive operations are presented. Topics include facility production from waste preparation batching to canister filling.

  8. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  9. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  10. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  11. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  12. 23 CFR 646.210 - Classification of projects and railroad share of the cost.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Classification of projects and railroad share of the... ENGINEERING AND TRAFFIC OPERATIONS RAILROADS Railroad-Highway Projects § 646.210 Classification of projects and railroad share of the cost. (a) State laws requiring railroads to share in the cost of work...

  13. 49 CFR 220.307 - Use of railroad-supplied electronic devices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Use of railroad-supplied electronic devices. 220... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.307 Use of railroad-supplied electronic devices. (a) General restriction. A railroad operating...

  14. 23 CFR 646.210 - Classification of projects and railroad share of the cost.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Classification of projects and railroad share of the... ENGINEERING AND TRAFFIC OPERATIONS RAILROADS Railroad-Highway Projects § 646.210 Classification of projects and railroad share of the cost. (a) State laws requiring railroads to share in the cost of work...

  15. National Ignition Facility (NIF) operations procedures plan

    SciTech Connect

    Mantrom, D.

    1998-05-06

    The purpose of this Operations Procedures Plan is to establish a standard procedure which outlines how NIF Operations procedures will be developed (i.e , written, edited, reviewed, approved, published, revised) and accessed by the NIF Operations staff who must use procedures in order to accomplish their tasks. In addition, this Plan is designed to provide a guide to the NIF Project staff to assist them in planning and writing procedures. Also, resource and scheduling information is provided.

  16. School Facilities Maintenance and Operations Manual.

    ERIC Educational Resources Information Center

    Association of School Business Officials International, Reston, VA.

    Often a community's largest single investment is in its physical plants, including public school buildings and grounds. An essential factor in efficient school district operation is a well-organized, responsive plant operations and maintenance division. Maintenance has generally been defined as those services, activities, and procedures concerned…

  17. Developing operational safety requirements for non-nuclear facilities

    SciTech Connect

    Mahn, J.A.

    1997-11-01

    Little guidance has been provided by the DOE for developing appropriate Operational Safety Requirements (OSR) for non-nuclear facility safety documents. For a period of time, Chapter 2 of DOE/AL Supplemental Order 5481.lB provided format guidance for non-reactor nuclear facility OSRs when this supplemental order applied to both nuclear and non-nuclear facilities. Thus, DOE Albuquerque Operations Office personnel still want to see non-nuclear facility OSRs in accordance with the supplemental order (i.e., in terms of Safety Limits, Limiting Conditions for Operation, and Administrative Controls). Furthermore, they want to see a clear correlation between the OSRs and the results of a facility safety analysis. This paper demonstrates how OSRs can be rather simply derived from the results of a risk assessment performed using the ``binning`` methodology of SAND95-0320.

  18. 33 CFR 158.163 - Reception facility operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Reception facility operations. 158.163 Section 158.163 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION RECEPTION FACILITIES FOR OIL, NOXIOUS LIQUID SUBSTANCES, AND GARBAGE General § 158.163...

  19. 33 CFR 158.163 - Reception facility operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Reception facility operations. 158.163 Section 158.163 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION RECEPTION FACILITIES FOR OIL, NOXIOUS LIQUID SUBSTANCES, AND GARBAGE General § 158.163...

  20. Design and operations at the National Tritium Labelling Facility

    SciTech Connect

    Morimoto, H.; Williams, P.G.

    1991-09-01

    The National Tritium Labelling Facility (NTLF) is a multipurpose facility engaged in tritium labeling research. It offers to the biomedical research community a fully equipped laboratory for the synthesis and analysis of tritium labeled compounds. The design of the tritiation system, its operations and some labeling techniques are presented.

  1. Panorama, section 2 of 3, note the Operations Building (Facility ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Panorama, section 2 of 3, note the Operations Building (Facility 294) in the center of facility, view facing west - U.S. Naval Base, Pearl Harbor, Naval Radio Station, AF/FRD-10 Circularly Disposed Antenna Array, Wahiawa, Honolulu County, HI

  2. 26 CFR 1.45G-1 - Railroad track maintenance credit.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... transport of freight by a railroad and that are owned or leased by the Class II railroad or Class III... group. Example 1. A is a manufacturer that in 2006, transports its products by rail using the railroad... a railroad, but is a taxpayer that, in 2006, transports its products using the rail facilities of...

  3. 49 CFR 241.13 - Prohibition against track owner's requiring or permitting use of its line for a railroad...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... permitting use of its line for a railroad operation dispatched by an extraterritorial dispatcher; exceptions... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION UNITED STATES LOCATIONAL REQUIREMENT FOR DISPATCHING... use of its line for a railroad operation dispatched by an extraterritorial dispatcher; exceptions....

  4. 49 CFR 241.13 - Prohibition against track owner's requiring or permitting use of its line for a railroad...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... permitting use of its line for a railroad operation dispatched by an extraterritorial dispatcher; exceptions... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION UNITED STATES LOCATIONAL REQUIREMENT FOR DISPATCHING... use of its line for a railroad operation dispatched by an extraterritorial dispatcher; exceptions....

  5. 49 CFR 241.13 - Prohibition against track owner's requiring or permitting use of its line for a railroad...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... permitting use of its line for a railroad operation dispatched by an extraterritorial dispatcher; exceptions... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION UNITED STATES LOCATIONAL REQUIREMENT FOR DISPATCHING... use of its line for a railroad operation dispatched by an extraterritorial dispatcher; exceptions....

  6. 49 CFR 241.13 - Prohibition against track owner's requiring or permitting use of its line for a railroad...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... permitting use of its line for a railroad operation dispatched by an extraterritorial dispatcher; exceptions... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION UNITED STATES LOCATIONAL REQUIREMENT FOR DISPATCHING... use of its line for a railroad operation dispatched by an extraterritorial dispatcher; exceptions....

  7. 49 CFR 241.13 - Prohibition against track owner's requiring or permitting use of its line for a railroad...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... permitting use of its line for a railroad operation dispatched by an extraterritorial dispatcher; exceptions... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION UNITED STATES LOCATIONAL REQUIREMENT FOR DISPATCHING... use of its line for a railroad operation dispatched by an extraterritorial dispatcher; exceptions....

  8. 76 FR 56873 - Coos Bay Railroad Operating Company, LLC d/b/a Coos Bay Rail Link-Operation Exemption-Line of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-14

    ... Company, LLC d/b/a Coos Bay Rail Link (CBR), a noncarrier, has filed a verified notice of exemption under... Bay Rail Link, wherein American Railroad Group Transportation Services, LLC, CBR's corporate parent, seeks Board approval to continue in control of CBR, upon CBR's becoming a Class III rail carrier...

  9. Lunar landing and launch facilities and operations

    NASA Technical Reports Server (NTRS)

    1988-01-01

    A preliminary design of a lunar landing and launch facility for a Phase 3 lunar base is formulated. A single multipurpose vehicle for the lunar module is assumed. Three traffic levels are envisioned: 6, 12, and 24 landings/launches per year. The facility is broken down into nine major design items. A conceptual description of each of these items is included. Preliminary sizes, capacities, and/or other relevant design data for some of these items are obtained. A quonset hut tent-like structure constructed of aluminum rods and aluminized mylar panels is proposed. This structure is used to provide a constant thermal environment for the lunar modules. A structural design and thermal analysis is presented. Two independent designs for a bridge crane to unload/load heavy cargo from the lunar module are included. Preliminary investigations into cryogenic propellant storage and handling, landing/launch guidance and control, and lunar module maintenance requirements are performed. Also, an initial study into advanced concepts for application to Phase 4 or 5 lunar bases has been completed in a report on capturing, condensing, and recycling the exhaust plume from a lunar launch.

  10. Spent nuclear fuel project cold vacuum drying facility operations manual

    SciTech Connect

    IRWIN, J.J.

    1999-05-12

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998) and, the HNF-SD-SNF-DRD-002, 1997, Cold Vacuum Drying Facility Design Requirements, Rev. 3a. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence, and has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

  11. Operational summary of an electric propulsion long term test facility

    NASA Technical Reports Server (NTRS)

    Trump, G. E.; James, E. L.; Bechtel, R. T.

    1982-01-01

    An automated test facility capable of simultaneously operating three 2.5 kW, 30-cm mercury ion thrusters and their power processors is described, along with a test program conducted for the documentation of thruster characteristics as a function of time. Facility controls are analog, with full redundancy, so that in the event of malfunction the facility automaticcally activates a backup mode and notifies an operator. Test data are recorded by a central data collection system and processed as daily averages. The facility has operated continuously for a period of 37 months, over which nine mercury ion thrusters and four power processor units accumulated a total of over 14,500 hours of thruster operating time.

  12. Operational summary of an electric propulsion long term test facility

    NASA Technical Reports Server (NTRS)

    Trump, G. E.; James, E. L.; Bechtel, R. T.

    1982-01-01

    An automated test facility capable of simultaneously operating three 2.5 kW, 30-cm mercury ion thrusters and their power processors is described, along with a test program conducted for the documentation of thruster characteristics as a function of time. Facility controls are analog, with full redundancy, so that in the event of malfunction the facility automaticcally activates a backup mode and notifies an operator. Test data are recorded by a central data collection system and processed as daily averages. The facility has operated continuously for a period of 37 months, over which nine mercury ion thrusters and four power processor units accumulated a total of over 14,500 hours of thruster operating time.

  13. 49 CFR 236.787a - Railroad.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... Railroad means any form of non-highway ground transportation that runs on rails or electromagnetic... Consolidated Rail Corporation on January 1, 1979; and (b) High speed ground transportation systems that connect... traditional railroads; but does not include rapid transit operations in an urban area that are not...

  14. 49 CFR 236.787a - Railroad.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... Railroad means any form of non-highway ground transportation that runs on rails or electromagnetic... Consolidated Rail Corporation on January 1, 1979; and (b) High speed ground transportation systems that connect... traditional railroads; but does not include rapid transit operations in an urban area that are not...

  15. 49 CFR 236.787a - Railroad.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... Railroad means any form of non-highway ground transportation that runs on rails or electromagnetic... Consolidated Rail Corporation on January 1, 1979; and (b) High speed ground transportation systems that connect... traditional railroads; but does not include rapid transit operations in an urban area that are not...

  16. Railroad electrification in America's future: an assessment of prospects and impacts. Final report

    SciTech Connect

    White, R.K.; Yabroff, I.W.; Dickson, E.M.; Zink, R.A.; Gray, M.E.; Moon, A.E.

    1980-01-01

    Such considerations as the level of traffic, the relative financial health of individual railroads, the capacity of the associated supply and engineering/construction industries, and the logical connecting points at classifying yards, as well as the national interest value of creating a continuous system, continental in scope, were used to construct a scenario for railroad electrification that closely approximates how an electrification program might be implemented. For the economic reasons cited, much of the US railroad system would remain conventionally powered. This scenario provides for an electrified network involving 14 mainlines operated by 10 companies that could transport much of the nation's rail-borne freight. Five years of planning and engineering work would be required for each link before construction could begin. With 1000 miles or less of electrified route per year, 14 years would be needed to construct the 9000-mile network of our scenario. (The scenario constructed runs from 1980 to 1998.) The analysis was aided with the construction of the SRI Railroad Industry Model. Basically a model of industry operations and finances, the model produces income statements and balance sheets at yearly intervals. Railroad energy costs, railroad freight levels, maintenance costs, purchases and leases of rooling stock, electrification facility investments, future inflation, rate setting practices, annual depreciation, taxes, and profits were calculated.

  17. Lunar landing and launch facilities and operations

    NASA Technical Reports Server (NTRS)

    1988-01-01

    A preliminary definition of a lunar landing and launch facility (LLLF or Complex 391) has been formulated. A Phase 3 lunar base is considered. Without specifying specific lunar base scenarios, three traffic levels are envisioned: 6, 12, and 24 landings/launches per year. A single, multipurpose vehicle for the lunar module is assumed. The design and specification of the vehicle and of the lunar base are outside the scope of this study. However, these two items will impact those items considered within the scope of this study because of interactions at the system boundaries. The scope of this study is graphically portrayed with the systems diagram. Based upon this diagram, nine major design items or areas are considered. These items are: (1) landing/launch site considerations; (2) structure, shelter, safety, and environmental needs; (3) landing/launch guidance, communications, and computing needs; (4) lunar module surface transport system; (5) heavy cargo unloading/loading systems; (6) personnel unloading/loading systems; (7) propellant unloading/loading systems; (8) vehicle storage; and (9) maintenance, repair, test and check-out requirements. Initially, a general, conceptual description of each of these items is given. Then, preliminary sizes, capacities, and other relevant design data for some of these items are identified. The Earth-Moon transportation infrastructure and the baseline lunar module design are summarized.

  18. 49 CFR 1.88 - The Federal Railroad Administration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 1 2014-10-01 2014-10-01 false The Federal Railroad Administration. 1.88 Section... AND DUTIES Operating Administrations § 1.88 The Federal Railroad Administration. Is responsible for: (a) Regulating safety functions pertaining to railroads; (b) Conducting research and...

  19. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  20. 49 CFR 1.88 - The Federal Railroad Administration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false The Federal Railroad Administration. 1.88 Section... AND DUTIES Operating Administrations § 1.88 The Federal Railroad Administration. Is responsible for: (a) Regulating safety functions pertaining to railroads; (b) Conducting research and...

  1. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  2. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  3. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  4. 49 CFR 218.59 - Responsibilities of railroads.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Responsibilities of railroads. 218.59 Section 218.59 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Prohibition Against Tampering...

  5. Reliability Considerations for the Operation of Large Accelerator User Facilities

    DOE PAGES

    Willeke, F. J.

    2016-01-29

    The lecture provides an overview of considerations relevant for achieving highly reliable operation of accelerator based user facilities. The article starts with an overview of statistical reliability formalism which is followed by high reliability design considerations with examples. Finally, the article closes with operational aspects of high reliability such as preventive maintenance and spares inventory.

  6. 14 CFR 121.122 - Communications facilities-supplemental operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... two engines must show that a two-way radio communication system or other means of communication... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Communications facilities-supplemental... Supplemental Operations § 121.122 Communications facilities—supplemental operations. (a) Each...

  7. Reliability Considerations for the Operation of Large Accelerator User Facilities

    SciTech Connect

    Willeke, F. J.

    2016-01-29

    The lecture provides an overview of considerations relevant for achieving highly reliable operation of accelerator based user facilities. The article starts with an overview of statistical reliability formalism which is followed by high reliability design considerations with examples. Finally, the article closes with operational aspects of high reliability such as preventive maintenance and spares inventory.

  8. Defense Waste Processing Facility Radioactive Operations - Year Two

    SciTech Connect

    Occhipinti, J.E.; Carter, J.T.; Edwards, R.E.; Beck, R.S.; Iverson, D.C.

    1998-03-01

    The Savannah River Site`s Defense Waste Processing Facility (DWPF) near Aiken, SC is the nation`s first high-level radioactive waste vitrification facility. This waste (130 million liters) which has been stored in carbon steel underground tanks and is now being pretreated, melted into a highly durable borosilicate glass and poured into stainless steel canisters for eventual disposal in a geologic repository. Following a ten-year construction period and nearly three-year nonradioactive test program, the DWPF began radioactive operations in March 1996. The first nine months of radioactive operations have been reported previously. As with any complex technical facility, difficulties were encountered during the transition to radioactive operations. Results of the second year of radioactive operations are presented in this paper. The discussion includes: feed preparation and glass melting, resolution of the melter pouring issues, improvements in processing attainment and throughput, and planned improvements in laboratory attainment and throughput.

  9. Operational safety at the fast flux test facility

    SciTech Connect

    Bennett, C.L.; Baird, Q.L.; Franz, G.R.

    1986-01-01

    The safety organization within Westinghouse Hanford Company (WHC) provides the independent review and appraisal of reactor facilities at the Hanford Engineering Development Laboratory (HEDL) in accordance with US Department of Energy (DOE) Order 5480.1A, Chapter V. The safety organization functions primarily in an advisory capacity to the line organization and reports through a management organization independent of all reactor operations to the president of WHC. However, safety is a line responsibility, and neither review nor subsequent approval by the safety staff releases line management from its responsibility for the safety of people and equipment. The purpose of this paper is to describe the operational safety program at HEDL associated with the operation of the Fast Flux Test Facility (FFTF). These activities include: (1) operational reactor safety surveillance; (2) change review of safety documentation; (3) cycle readiness assessments; (4) FFTF technical specification upgrade; (5) interim examination and maintenance cell and fuel storage facility safety review.

  10. Reusing Railroad Stations. A Report.

    ERIC Educational Resources Information Center

    Educational Facilities Labs., Inc., New York, NY.

    Railroad stations are a unique American resource that should continue to serve public and private interests even though their original purpose may have passed. Large stations should be considered as prominent civic structures whose redevelopment could offer significant opportunities to influence the future character, economy, and operation of…

  11. Technological Advances, Human Performance, and the Operation of Nuclear Facilities

    NASA Astrophysics Data System (ADS)

    Corrado, Jonathan K.

    Many unfortunate and unintended adverse industrial incidents occur across the United States each year, and the nuclear industry is no exception. Depending on their severity, these incidents can be problematic for people, the facilities, and surrounding environments. Human error is a contributing factor in many such incidents. This dissertation first explored the hypothesis that technological changes that affect how operators interact within the systems of the nuclear facilities exacerbate the cost of incidents caused by human error. I conducted a review of nuclear incidents in the United States from 1955 through 2010 that reached Level 3 (serious incident) or higher on the International Nuclear Events Scale (INES). The cost of each incident at facilities that had recently undergone technological changes affecting plant operators' jobs was compared to the cost of events at facilities that had not undergone changes. A t-test determined a statistically significant difference between the two groups, confirming the hypothesis. Next, I conducted a follow-on study to determine the impact of the incorporation of new technologies into nuclear facilities. The data indicated that spending more money on upgrades increased the facility's capacity as well as the number of incidents reported, but the incident severity was minor. Finally, I discuss the impact of human error on plant operations and the impact of evolving technology on the 21st-century operator, proposing a methodology to overcome these challenges by applying the systems engineering process.

  12. Description and Operation of the A3 Subscale Facility

    NASA Technical Reports Server (NTRS)

    Saunders, G. P.; Varner, D. G.; Grover, J. B.

    2010-01-01

    The purpose of this paper is to give an overview of the general design and operation of the A3 Subscale test facility. The goal is to provide the reader with a general understanding of what the major facility systems are, where they are located, and how they are used to meet the objectives supporting the design of the A3 altitude rocket test facility. This paper also provides the reader with the background information prior to reading the subsequent papers detailing the design and test results of the various systems described herein.

  13. Recent Enhancements to the National Transonic Facility (Mixed Mode Operations)

    NASA Technical Reports Server (NTRS)

    Kilgore, W. Allen; Chan, David; Balakrishna, S.; Wahls, Richard A.

    2006-01-01

    The U.S. National Transonic Facility continues to make enhancements to provide quality data in a safe, efficient and cost effective method for aerodynamic ground testing. Recent enhancements discussed in this paper include the development of a Mixed-mode of operations that combine Air-mode operations with Nitrogen-mode operations. This implementation and operational results of this new Mixed-mode expands the ambient temperature transonic region of testing beyond the Air-mode limitations at a significantly reduced cost over Nitrogen Mode operation.

  14. Assuring operational readiness of the National Ignition Facility.

    PubMed

    Brereton, Sandra J; Papp, Frank

    2013-06-01

    National Ignition Facility experiments involve the use of a variety of materials that generate a number of radiological issues. Along with the use of tritium and depleted uranium, shots generating neutrons create prompt radiation fields as well as fission and activation products. In order to assure readiness for these hazards, a series of readiness reviews was conducted as the hazards were introduced. Each step was built upon the previous steps, as well as the basic infrastructure and operating capability of the laser facility. A detailed preparation plan for the introduction of these hazards was developed. This included ensuring required equipment was in place and ready, all plans and procedures were developed, and personnel were trained and qualified to perform work in the environment. The approach for preparing the facility for operations under the new set of conditions, the preparations for the readiness reviews, the review process, as well as the approach to initial operations are discussed.

  15. An overview of the Railroad Retirement program.

    PubMed

    Whitman, Kevin

    2008-01-01

    In the 1930s, amidst concern about the ability of existing pension programs to provide former railroad workers with adequate assistance in old age, Congress established a national Railroad Retirement system. This system is primarily administered by the Railroad Retirement Board (RRB), which is an independent federal agency charged with providing benefits to eligible employees of the railroad industry and their families. Today, the Railroad Retirement program is closely tied to the far better-known Social Security program, and although the Railroad Retirement program and Social Security share a number of common elements, key differences also exist between the two in areas such as funding and benefit structure. This article aims to increase awareness and understanding of the Railroad Retirement program and its relationship with Social Security by examining the parallel development of these two retirement programs while illuminating areas where the two diverge. The history of the Railroad Retirement program, the benefits provided by the program, and RRB's financial operations are reviewed, using elements of the Social Security system as points of reference.

  16. APET methodology for Defense Waste Processing Facility: Mode C operation

    SciTech Connect

    Taylor, R.P. Jr.; Massey, W.M.

    1995-04-01

    Safe operation of SRS facilities continues to be the highest priority of the Savannah River Site (SRS). One of these facilities, the Defense Waste Processing Facility or DWPF, is currently undergoing cold chemical runs to verify the design and construction preparatory to hot startup in 1995. The DWPFF is a facility designed to convert the waste currently stored in tanks at the 200-Area tank farm into a form that is suitable for long term storage in engineered surface facilities and, ultimately, geologic isolation. As a part of the program to ensure safe operation of the DWPF, a probabilistic Safety Assessment of the DWPF has been completed. The results of this analysis are incorporated into the Safety Analysis Report (SAR) for DWPF. The usual practice in preparation of Safety Analysis Reports is to include only a conservative analysis of certain design basis accidents. A major part of a Probabilistic Safety Assessment is the development and quantification of an Accident Progression Event Tree or APET. The APET provides a probabilistic representation of potential sequences along which an accident may progress. The methodology used to determine the risk of operation of the DWPF borrows heavily from methods applied to the Probabilistic Safety Assessment of SRS reactors and to some commercial reactors. This report describes the Accident Progression Event Tree developed for the Probabilistic Safety Assessment of the DWPF.

  17. Man-Vehicle Systems Research Facility - Design and operating characteristics

    NASA Technical Reports Server (NTRS)

    Shiner, Robert J.; Sullivan, Barry T.

    1992-01-01

    This paper describes the full-mission flight simulation facility at the NASA Ames Research Center. The Man-Vehicle Systems Research Facility (MVSRF) supports aeronautical human factors research and consists of two full-mission flight simulators and an air-traffic-control simulator. The facility is used for a broad range of human factors research in both conventional and advanced aviation systems. The objectives of the research are to improve the understanding of the causes and effects of human errors in aviation operations, and to limit their occurrence. The facility is used to: (1) develop fundamental analytical expressions of the functional performance characteristics of aircraft flight crews; (2) formulate principles and design criteria for aviation environments; (3) evaluate the integration of subsystems in contemporary flight and air traffic control scenarios; and (4) develop training and simulation technologies.

  18. Man-Vehicle Systems Research Facility - Design and operating characteristics

    NASA Technical Reports Server (NTRS)

    Shiner, Robert J.; Sullivan, Barry T.

    1992-01-01

    This paper describes the full-mission flight simulation facility at the NASA Ames Research Center. The Man-Vehicle Systems Research Facility (MVSRF) supports aeronautical human factors research and consists of two full-mission flight simulators and an air-traffic-control simulator. The facility is used for a broad range of human factors research in both conventional and advanced aviation systems. The objectives of the research are to improve the understanding of the causes and effects of human errors in aviation operations, and to limit their occurrence. The facility is used to: (1) develop fundamental analytical expressions of the functional performance characteristics of aircraft flight crews; (2) formulate principles and design criteria for aviation environments; (3) evaluate the integration of subsystems in contemporary flight and air traffic control scenarios; and (4) develop training and simulation technologies.

  19. The Defense Waste Processing Facility: Two Years of Radioactive Operation

    SciTech Connect

    Marra, S.L.; Gee, J.T.; Sproull, J.F.

    1998-05-01

    The Defense Waste Processing Facility (DWPF) at the Savannah River Site in Aiken, SC is currently immobilizing high level radioactive sludge waste in borosilicate glass. The DWPF began vitrification of radioactive waste in May, 1996. Prior to that time, an extensive startup test program was completed with simulated waste. The DWPF is a first of its kind facility. The experience gained and data collected during the startup program and early years of operation can provide valuable information to other similar facilities. This experience involves many areas such as process enhancements, analytical improvements, glass pouring issues, and documentation/data collection and tracking. A summary of this experience and the results of the first two years of operation will be presented.

  20. ARM Operations and Engineering Procedure Mobile Facility Site Startup

    SciTech Connect

    Voyles, Jimmy W

    2015-05-01

    This procedure exists to define the key milestones, necessary steps, and process rules required to commission and operate an Atmospheric Radiation Measurement (ARM) Mobile Facility (AMF), with a specific focus toward on-time product delivery to the ARM Data Archive. The overall objective is to have the physical infrastructure, networking and communications, and instrument calibration, grooming, and alignment (CG&A) completed with data products available from the ARM Data Archive by the Operational Start Date milestone.

  1. Operations aspects of the Fermilab Central Helium Liquefier Facility

    SciTech Connect

    Geynisman, M.G.; Makara, J.N.

    1995-03-01

    The Fermilab Central Helium Liquefier (CHL) facility consists of helium and nitrogen reliquefier plants operated 24 hours-a-day to supply LHe at 4.6{degrees}K and LN{sub 2} for the Fermilab Tevatron superconducting proton-antiproton collider ring and to recover warm return gases. Operating aspects of CHL, including different equipment and systems reliability, availability, maintenance experience, safety concerns, and economics aspects are discussed.

  2. Space Station Freedom technology payload user operations facility concept

    NASA Technical Reports Server (NTRS)

    Henning, Gary N.; Avery, Don E.

    1992-01-01

    This report presents a concept for a User Operations Facility (UOF) for payloads sponsored by the NASA Office of Aeronautics and Space Technology (OAST). The UOF can be located at any OAST sponsored center; however, for planning purposes, it is assumed that the center will be located at Langley Research Center (LaRC).

  3. 75 FR 54543 - Changes to NARA Facilities' Hours of Operation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-08

    ... RECORDS ADMINISTRATION 36 CFR Parts 1253, 1254, and 1280 RIN 3095-AB68 Changes to NARA Facilities' Hours of Operation AGENCY: National Archives and Records Administration. ACTION: Proposed rule. SUMMARY: The National Archives and Records Administration (NARA) is proposing to revise its regulations...

  4. Federal Guidelines - Operation and Maintenance of Wastewater Treatment Facilities.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Water Programs.

    This document contains the federal guidelines for meeting the specific requirements of the Federal Water Pollution Control Act Amendments of 1972. These guidelines are also intended to assist in meeting the regulations for grant assisted facility construction and to provide information on the key elements to be included in the operation plans for…

  5. Construction and initial operation of the Advanced Toroidal Facility

    SciTech Connect

    Bell, G.L.; Bell, J.D.; Benson, R.D.; Bigelow, T.S.; Chipley, K.K.; Colchin, R.J.; Cole, M.J.; Crume, E.C.; Dunlap, J.L.; England, A.C.; Glowienka, J.C.; Goulding, R.H.; Harris, J.H.; Hillis, D.L.; Hiroe, S.; Horton, L.D.; Howe, H.C.; Isler, R.C.; Jernigan, T.C.; Johnson, R.L.; Langley, R.A.; Menon, M.M.; Mioduszewski, P.K.; Morris, R.N.; Murakami, M.; Neilson, G.H.; Nelson, B.E.; Rasmussen, D.A.; Rome, J.A.; Saltmarsh, M.J.

    1989-08-01

    The Advanced Toroidal Facility (ATF) torsatron was designed on a physics basis for access to the second stability regime and on an engineering basis for independent fabrication of high-accuracy components. The actual construction, assembly, and initial operation of ATF are compared with the characteristics expected during the design of ATF. 31 refs., 19 figs., 2 tabs.

  6. Moonport: A History of Apollo Launch Facilities and Operations

    NASA Technical Reports Server (NTRS)

    Benson, C. D.; Faherty, W. B.

    1978-01-01

    The development of the Apollo f launch facilities and launch operations is described from the beginning of design through the final launch. Management techniques, innovation in automation, and testing on the ground to avoid failures in space are among the topics covered. The impact of the Apollo program on the citrus groves and quiet beaches of Florida's east coast is included.

  7. Operations of the reconfigured Ground Communications Facility Central Communications Terminal and the Network Operations Control Center

    NASA Technical Reports Server (NTRS)

    Santana, J. C.; Jennings, L. E.

    1982-01-01

    The ground communications facility (GCF) central communications terminal and network operations control center (NOCC) hardware was rearranged, supplemented, and modified, and software programs changed to provide an improved GCF and NOCC operational environment and capability. Control center operations section activities required to make the changeover from the old to the new GCF and NOCC configuration are addressed.

  8. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment if...

  9. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment if...

  10. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment if...

  11. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment if...

  12. 29 CFR 788.11 - “Transporting [such] products to the mill, processing plant, railroad, or other transportation...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DIRECTLY RELATED TO REGULATIONS FORESTRY OR LOGGING OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE... terminal.” The transportation or movement of logs or other forestry products to a “mill processing plant... other forestry products onto railroad cars or other transportation facilities for further shipment if...

  13. Space facilities: Meeting future needs for research, development, and operations

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The National Facilities Study (NFS) represents an interagency effort to develop a comprehensive and integrated long-term plan for world-class aeronautical and space facilities that meet current and projected needs for commercial and government aerospace research and development and space operations. At the request of NASA and the DOD, the National Research Council's Committee on Space Facilities has reviewed the space related findings of the NFS. The inventory of more than 2800 facilities will be an important resource, especially if it continues to be updated and maintained as the NFS report recommends. The data in the inventory provide the basis for a much better understanding of the resources available in the national facilities infrastructure, as well as extensive information on which to base rational decisions about current and future facilities needs. The working groups have used the inventory data and other information to make a set of recommendations that include estimates of cast savings and steps for implementation. While it is natural that the NFS focused on cost reduction and consolidations, such a study is most useful to future planning if it gives equal weight to guiding the direction of future facilities needed to satisfy legitimate national aspirations. Even in the context of cost reduction through facilities closures and consolidations, the study is timid about recognizing and proposing program changes and realignments of roles and missions to capture what could be significant savings and increased effectiveness. The recommendations of the Committee on Space Facilities are driven by the clear need to be more realistic and precise both in recognizing current incentives and disincentives in the aerospace industry and in forecasting future conditions for U.S. space activities.

  14. 49 CFR 27.71 - Airport facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Airport facilities. 27.71 Section 27.71... OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility Requirements in Specific Operating Administration Programs: Airports, Railroads, and Highways § 27.71 Airport facilities. (a) This section applies...

  15. 49 CFR 27.71 - Airport facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Airport facilities. 27.71 Section 27.71... OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility Requirements in Specific Operating Administration Programs: Airports, Railroads, and Highways § 27.71 Airport facilities. (a) This section applies...

  16. 49 CFR 27.71 - Airport facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 1 2013-10-01 2013-10-01 false Airport facilities. 27.71 Section 27.71... OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility Requirements in Specific Operating Administration Programs: Airports, Railroads, and Highways § 27.71 Airport facilities. (a) This section applies...

  17. 49 CFR 27.71 - Airport facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false Airport facilities. 27.71 Section 27.71... OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility Requirements in Specific Operating Administration Programs: Airports, Railroads, and Highways § 27.71 Airport facilities. (a) This section applies...

  18. Operational Readiness Review: Savannah River Replacement Tritium Facility

    SciTech Connect

    Not Available

    1993-02-01

    The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members.

  19. Umatilla Hatchery Satellite Facilities Operation and Maintenance; 1996 Annual Report.

    SciTech Connect

    Rowan, Gerald D.

    1997-06-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow satellite facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead and Three Mile Dam is used for holding and spawning adult fall chinook and coho salmon. Bonifer, Minthorn, Imeques and Thornhollow facilities are operated for acclimation and release of juvenile salmon and summer steelhead. The main goal of acclimation is to reduce stress from trucking prior to release and improve imprinting of juvenile salmonids in the Umatilla River Basin. Juveniles are transported to the acclimation facilities primarily from Umatilla and Bonneville Hatcheries. This report details activities associated with operation and maintenance of the Bonifer, Minthorn, Imeques, Thornhollow and Three Mile Dam facilities in 1996.

  20. 77 FR 61049 - North Louisiana & Arkansas Railroad, Inc.-Acquisition and Operation Exemption-Line of Lake...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... milepost 471.0, at or near East Carroll Parish, La. \\1\\ LPPC states that it does not operate the line but.... Exemption--In E. Carroll Parish, La., AB 384 (Sub-No. 2X) (STB served June 7, 2011). LPPC acquired the... Carroll Parish. The trackage rights will allow NLA to operate over a line of the Delta Southern...

  1. Operators in the Plum Brook Reactor Facility Control Room

    NASA Image and Video Library

    1970-03-21

    Donald Rhodes, left, and Clyde Greer, right, monitor the operation of the National Aeronautics and Space Administration’s (NASA) Plum Brook Reactor Facility from the control room. The 60-megawatt test reactor, NASA’s only reactor, was the eighth largest test reactor in the world. The facility was built by the Lewis Research Center in the late 1950s to study the effects of radiation on different materials that could be used to construct nuclear propulsion systems for aircraft or rockets. The reactor went critical for the first time in 1961. For the next two years, two operators were on duty 24 hours per day working on the fission process until the reactor reached its full-power level in 1963. Reactor Operators were responsible for monitoring and controlling the reactor systems. Once the reactor was running under normal operating conditions, the work was relatively uneventful. Normally the reactor was kept at a designated power level within certain limits. Occasionally the operators had to increase the power for a certain test. The shift supervisor and several different people would get together and discuss the change before boosting the power. All operators were required to maintain a Reactor Operator License from the Atomic Energy Commission. The license included six months of training, an eight-hour written exam, a four-hour walkaround, and testing on the reactor controls.

  2. Pre-operational safety appraisal Tritiated Scrap Recovery Facility, Mound facility

    SciTech Connect

    Dauby, J.J.; Flanagan, T.M.; Metcalf, L.W.; Rhinehammer, T.B.

    1996-07-01

    The purpose of this report is to identify, assess, and document the hazards which are associated with the proposed operation of the Tritiated Scrap Recovery Facility at Mound Facility. A Pre-operational Safety Appraisal is a requirement as stated in Department of Energy Order 5481.1, Safety Analysis and Review System. The operations to be conducted in the new Tritiated Scrap Waste Recovery Facility are not new, but a continuation of a prime mission of Mound`s i.e. recovery of tritium from waste produced throughout the DOE complex. The new facility is a replacement of an existing process started in the early 1960`s and incorporates numerous design changes to enhance personnel and environmental safety. This report also documents the safety of a one time operation involving the recovery of tritium from material obtained by the Department of Energy from the State of Arizona. This project will involve the processing of 240,000 curies of tritium contained in glass ampoules that were to be used in items such as luminous dial watches. These were manufactured by the now defunct American Atomics Corporation, Tucson, Arizona.

  3. Railroad and locomotive technology roadmap.

    SciTech Connect

    Stodolsky, F.; Gaines, L.; Energy Systems

    2003-02-24

    Railroads are important to the U.S. economy. They transport freight efficiently, requiring less energy and emitting fewer pollutants than other modes of surface transportation. While the railroad industry has steadily improved its fuel efficiency--by 16% over the last decade--more can, and needs to, be done. The ability of locomotive manufacturers to conduct research into fuel efficiency and emissions reduction is limited by the small number of locomotives manufactured annually. Each year for the last five years, the two North American locomotive manufacturers--General Electric Transportation Systems and the Electro-Motive Division of General Motors--have together sold about 800 locomotives in the United States. With such a small number of units over which research costs can be spread, outside help is needed to investigate all possible ways to reduce fuel usage and emissions. Because fuel costs represent a significant portion of the total operating costs of a railroad, fuel efficiency has always been an important factor in the design of locomotives and in the operations of a railroad. However, fuel efficiency has recently become even more critical with the introduction of strict emission standards by the U.S. Environmental Protection Agency, to be implemented in stages (Tiers 0, 1, and 2) between 2000 and 2005. Some of the technologies that could be employed to meet the emission standards may negatively affect fuel economy--by as much as 10-15% when emissions are reduced to Tier 1 levels. Lowering fuel economy by that magnitude would have a serious impact on the cost to the consumer of goods shipped by rail, on the competitiveness of the railroad industry, and on this country's dependence on foreign oil. Clearly, a joint government/industry R&D program is needed to help catalyze the development of advanced technologies that will substantially reduce locomotive engine emissions while also improving train system energy efficiency. DOE convened an industry

  4. High-Pressure Gaseous Burner (HPGB) Facility Became Operational

    NASA Technical Reports Server (NTRS)

    Nguyen, Quang-Viet

    2003-01-01

    A gas-fueled high-pressure combustion facility with optical access, developed over the last 3 years, is now collecting research data in a production mode. The High-Pressure Gaseous Burner (HPGB) rig at the NASA Glenn Research Center can operate at sustained pressures up to 60 atm with a variety of gaseous fuels and liquid jet fuel. The facility is unique because it is the only continuous-flow, hydrogen-capable 60-atm rig in the world with optical access. It will provide researchers with new insights into flame conditions that simulate the environment inside the ultra-high-pressure-ratio combustion chambers of tomorrow s advanced aircraft engines. The facility provides optical access to the flame zone through four fused-silica optical windows, enabling the calibration of nonintrusive optical diagnostics to measure chemical species and temperature. The data from the HPGB rig enable the validation of numerical codes that simulate gas turbine combustors.

  5. Development of cloud-operating platform for detention facility design

    NASA Astrophysics Data System (ADS)

    Tun Lee, Kwan; Hung, Meng-Chiu; Tseng, Wei-Fan; Chan, Yi-Ping

    2017-04-01

    In the past 20 years, the population of Taiwan has accumulated in urban areas. The land development has changed the hydrological environment and resulted in the increase of surface runoff and shortened the time to peak discharge. The change of runoff characteristics increases the flood risk and reduces resilient ability of the city during flood. Considering that engineering measures may not be easy to implement in populated cities, detention facilities set on building basements have been proposed to compromise the increase of surface runoff resulting from development activities. In this study, a web-based operational platform has been developed to integrate the GIS technologies, hydrological analyses, as well as relevant regulations for the design of detention facilities. The design procedure embedded in the system includes a prior selection of type and size of the detention facility, integrated hydrological analysis for the developing site, and inspection of relevant regulations. After login the platform, designers can access the system database to retrieve road maps, land use coverages, and storm sewer information. Once the type, size, inlet, and outlet of the detention facility are assigned, the system can acquire the rainfall intensity-duration-frequency information from adjacent rain gauges to perform hydrological analyses for the developing site. The increase of the runoff volume due to the development and the reduction of the outflow peak through the construction of the detention facility can be estimated. The outflow peak at the target site is then checked with relevant regulations to confirm the suitability of the detention facility design. The proposed web-based platform can provide a concise layout of the detention facility and the drainageway of the developing site on a graphical interface. The design information can also be delivered directly through a web link to authorities for inspecting to simplify the complex administrative procedures.

  6. Design and operation of a horizontal liquid helium flow facility

    SciTech Connect

    Van Sciver, S.W.; Wiesend, J.G. II

    1988-01-01

    The University of Wisconsin horizontal liquid helium flow facility (LHFF) consists of a five meter long 20 cm ID horizontal dewar connected to two end boxes. Several heat exchanger inserts have been built to allow variable temperature operation of 1.6 K less than or equal to T less than or equal to 4.2 K. A centrifugal pump is installed at one end of the facility permitting experiments in forced flow liquid helium up to 100 gm/s. The horizontal design allows experimentation on long straight test sections which may be used either to study fundamental properties of heat and mass transfer in helium or prototype cryogenic components under realistic conditions. A detailed description of the design and operating experience of the LHFF is presented. 5 refs., 5 figs.

  7. Man-vehicle systems research facility: Design and operating characteristics

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The Man-Vehicle Systems Research Facility (MVSRF) provides the capability of simulating aircraft (two with full crews), en route and terminal air traffic control and aircrew interactions, and advanced cockpit (1995) display representative of future generations of aircraft, all within the full mission context. The characteristics of this facility derive from research, addressing critical human factors issues that pertain to: (1) information requirements for the utilization and integration of advanced electronic display systems, (2) the interaction and distribution of responsibilities between aircrews and ground controllers, and (3) the automation of aircrew functions. This research has emphasized the need for high fidelity in simulations and for the capability to conduct full mission simulations of relevant aircraft operations. This report briefly describes the MVSRF design and operating characteristics.

  8. Feasibility study for a transportation operations system cask maintenance facility

    SciTech Connect

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

  9. Embracing Safe Ground Test Facility Operations and Maintenance

    NASA Technical Reports Server (NTRS)

    Dunn, Steven C.; Green, Donald R.

    2010-01-01

    Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.

  10. 75 FR 28673 - Carolina Coastal Railway, Inc.-Acquisition and Operation Exemption-Morehead & South Fork Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... Acquisition and Operation Exemption. SUMMARY: This document corrects a notice served and published in the... counsel has advised CLNA that MHSF is not a party to any lease agreement with SPA and therefore was not...\\ This notice correctly identifies MHSF, instead of SPA, as the regulated party to the transaction...

  11. 77 FR 33560 - Woodland Rail, LLC-Acquisition and Operation Exemption-Line of Maine Central Railroad Co.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-06

    ... Surface Transportation Board Woodland Rail, LLC--Acquisition and Operation Exemption--Line of Maine... engineering station 64+17 in Baileyville and engineering station 6978+84 in Calais, in Washington County, Me. The transaction includes a spur track between Woodland Junction, Me., which is engineering station 363...

  12. 77 FR 26604 - Progressive Rail, Incorporated-Lease and Operation Exemption-Rail Line of Union Pacific Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Progressive Rail, Incorporated--Lease and Operation Exemption-- Rail Line of... copies of all pleadings, referring to Docket No. FD 35617, must be filed with the Surface...

  13. 76 FR 72752 - Alaska Railroad Corporation-Construction and Operation Exemption-A Rail Line Extension to Port...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ... Line Extension to Port MacKenzie, AK AGENCY: Surface Transportation Board, DOT. ACTION: Notice of... and operate an approximately 35-mile rail line connecting the Port MacKenzie District in south-central... services between Port MacKenzie and the interior of Alaska and would support Port MacKenzie's continuing...

  14. 76 FR 22745 - Three Notch Railway, LLC-Acquisition and Operation Exemption-Three Notch Railroad Co., Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... interchange ] point with CSX Transportation, Inc., in Georgiana, Ala., and milepost 581.3 at Andalusia, Ala... Pike County, Ala.; and Docket No. FD 35489, Wiregrass Central Railway, LLC-- Acquisition and Operation... 821.2 near Newton, in Coffee and Dale Counties, Ala. The parties intend to consummate the...

  15. 76 FR 16654 - Austin Western Railroad, L.L.C.-Lease and Operation Exemption-Capital Metropolitan Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-24

    ... the affected lines, post a copy of the notice at the workplace of the employees on the affected lines... the Board that, on March 4, 2011, it posted notice of the transaction at the workplace of the... operational or maintenance changes on the lines. AWRR's waiver request will be handled in a separate decision...

  16. National Ignition Facility Control and Information System Operational Tools

    SciTech Connect

    Marshall, C D; Beeler, R G; Bowers, G A; Carey, R W; Fisher, J M; Foxworthy, C B; Frazier, T M; Mathisen, D G; Lagin, L J; Rhodes, J J; Shaw, M J

    2009-10-08

    The National Ignition Facility (NIF) in Livermore, California, is the world's highest-energy laser fusion system and one of the premier large scale scientific projects in the United States. The system is designed to setup and fire a laser shot to a fusion ignition or high energy density target at rates up to a shot every 4 hours. NIF has 192 laser beams delivering up to 1.8 MJ of energy to a {approx}2 mm target that is planned to produce >100 billion atm of pressure and temperatures of >100 million degrees centigrade. NIF is housed in a ten-story building footprint the size of three football fields as shown in Fig. 1. Commissioning was recently completed and NIF will be formally dedicated at Lawrence Livermore National Laboratory on May 29, 2009. The control system has 60,000 hardware controls points and employs 2 million lines of control system code. The control room has highly automated equipment setup prior to firing laser system shots. This automation has a data driven implementation that is conducive to dynamic modification and optimization depending on the shot goals defined by the end user experimenters. NIF has extensive facility machine history and infrastructure maintenance workflow tools both under development and deployed. An extensive operational tools suite has been developed to support facility operations including experimental shot setup, machine readiness, machine health and safety, and machine history. The following paragraphs discuss the current state and future upgrades to these four categories of operational tools.

  17. National Transonic Facility: A review of the operational plan

    NASA Technical Reports Server (NTRS)

    Liepmann, H. W.; Black, R. E.; Dietz, R. O.; Kirchner, M. E.; Sears, W. R.

    1980-01-01

    The proposed National Transonic Facility (NTF) operational plan is reviewed. The NTF will provide an aerodynamic test capability significantly exceeding that of other transonic regime wind tunnels now available. A limited number of academic research program that might use the NTF are suggested. It is concluded that the NTF operational plan is useful for management, technical, instrumentation, and model building techniques available in the specialized field of aerodynamic analysis and simulation. It is also suggested that NASA hold an annual conference to discuss wind tunnel research results and to report on developments that will further improve the utilization and cost effectiveness of the NTF and other wind tunnels.

  18. Operational readiness: an integral part of the facility planning process.

    PubMed

    Kidd, LeeAnne; Howe, Rob

    2014-01-01

    Large capital building projects benefit from an operational readiness strategy prior to new facility occupancy. St. Joseph's Healthcare used a structured approach for their readiness planning that included individual work plan meetings, tools for ensuring integration across programs and services and process improvement support to ensure a smooth transition. Over 1100 staff were oriented using a Train-the-Trainer model. Significant effort was required to co-ordinate the customized training, which involved "staffing up" to ensure sufficient resources for backfill. Operational readiness planning places additional demands on managers, requiring support and assistance from dedicated resources both prior to occupancy and several months post-move.

  19. Design and operation of an outdoor microalgae test facility

    SciTech Connect

    Weissman, J.C.; Tillett, D.M.; Goebel, R.P. )

    1989-10-01

    The objective of the project covered in this report is to establish and operate a facility in the American Southwest to test the concept of producing microalgae on a large scale. This microalgae would then be used as a feedstock for producing liquid fuels. The site chosen for this project was an existing water research station in Roswell, New Mexico; the climate and water resources are representative of those in the Southwest. For this project, researchers tested specific designs, modes of operation, and strains of microalgae; proposed and evaluated modifications to technological concepts; and assessed the progress toward meeting cost objectives.

  20. Solid Waste Operations Complex (SWOC) Facilities Sprinkler System Hydraulic Calculations

    SciTech Connect

    KERSTEN, J.K.

    2003-07-11

    The attached calculations demonstrate sprinkler system operational water requirements as determined by hydraulic analysis. Hydraulic calculations for the waste storage buildings of the Central Waste Complex (CWC), T Plant, and Waste Receiving and Packaging (WRAP) facility are based upon flow testing performed by Fire Protection Engineers from the Hanford Fire Marshal's office. The calculations received peer review and approval prior to release. The hydraulic analysis program HASS Computer Program' (under license number 1609051210) is used to perform all analyses contained in this document. Hydraulic calculations demonstrate sprinkler system operability based upon each individual system design and available water supply under the most restrictive conditions.

  1. Framework for Integrating Safety, Operations, Security, and Safeguards in the Design and Operation of Nuclear Facilities

    SciTech Connect

    Darby, John L.; Horak, Karl Emanuel; LaChance, Jeffrey L.; Tolk, Keith Michael; Whitehead, Donnie Wayne

    2007-10-01

    The US is currently on the brink of a nuclear renaissance that will result in near-term construction of new nuclear power plants. In addition, the Department of Energy’s (DOE) ambitious new Global Nuclear Energy Partnership (GNEP) program includes facilities for reprocessing spent nuclear fuel and reactors for transmuting safeguards material. The use of nuclear power and material has inherent safety, security, and safeguards (SSS) concerns that can impact the operation of the facilities. Recent concern over terrorist attacks and nuclear proliferation led to an increased emphasis on security and safeguard issues as well as the more traditional safety emphasis. To meet both domestic and international requirements, nuclear facilities include specific SSS measures that are identified and evaluated through the use of detailed analysis techniques. In the past, these individual assessments have not been integrated, which led to inefficient and costly design and operational requirements. This report provides a framework for a new paradigm where safety, operations, security, and safeguards (SOSS) are integrated into the design and operation of a new facility to decrease cost and increase effectiveness. Although the focus of this framework is on new nuclear facilities, most of the concepts could be applied to any new, high-risk facility.

  2. Risk management for operations of the LANL Critical Experiments Facility

    SciTech Connect

    Paternoster, R.; Butterfield, K.

    1998-12-31

    The Los Alamos Critical Experiments Facility (LACEF) currently operates two burst reactors (Godiva-IV and Skua), one solution assembly [the Solution High-Energy Burst Assembly (SHEBA)], two fast-spectrum benchmark assemblies (Flattop and Big Ten), and five general-purpose remote assembly machines that may be configured with nuclear materials and assembled by remote control. Special nuclear materials storage vaults support these and other operations at the site. With this diverse set of operations, several approaches are possible in the analysis and management of risk. The most conservative approach would be to write a safety analysis report (SAR) for each assembly and experiment. A more cost-effective approach is to analyze the probability and consequences of several classes of operations representative of operations on each critical assembly machine and envelope the bounding case accidents. Although the neutron physics of these machines varies widely, the operations performed at LACEF fall into four operational modes: steady-state mode, approach-to-critical mode, prompt burst mode, and nuclear material operations, which can include critical assembly fuel loading. The operational sequences of each mode are very nearly identical, whether operated on one assembly machine or another. The use of an envelope approach to accident analysis is facilitated by the use of classes of operations and the use of bounding case consequence analysis. A simple fault tree analysis of operational modes helps resolve which operations are sensitive to human error and which are initiated by hardware of software failures. Where possible, these errors and failures are blocked by TSR LCOs. Future work will determine the probability of accidents with various initiators.

  3. The insertion device magnetic measurement facility: Prototype and operational procedures

    SciTech Connect

    Burkel, L.; Dejus, R.; Maines, J.; O'Brien, J.; Vasserman, I. . Advanced Photon Source Accelerator Systems Div.); Pfleuger, J. , Hamburg . Hamburger Synchrotronstrahlungslabor)

    1993-03-01

    This report is a description of the current status of the magnetic measurement facility and is a basic instructional manual for the operation of the facility and its components. Please refer to the appendices for more detailed information about specific components and procedures. The purpose of the magnetic measurement facility is to take accurate measurements of the magnetic field in the gay of the IDs in order to determine the effect of the ID on the stored particle beam and the emitted radiation. The facility will also play an important role when evaluating new ideas, novel devices, and inhouse prototypes as part of the ongoing research and development program at the APS. The measurements will be performed with both moving search coils and moving Hall probes. The IDs will be evaluated by computer modeling of the emitted radiation for any given (measured) magnetic field map. The quality of the magnetic field will be described in terms of integrated multipoles for the effect on Storage Ring performance and in terms of the derived trajectories for the emitted radiation. Before being installed on the Storage Ring, every device will be measured and characterized to assure that it is compatible with Storage Ring requirements and radiation specifications. The accuracy that the APS needs to achieve for magnetic measurements will be based on these specifications.

  4. Operability test procedure for PFP wastewater sampling facility

    SciTech Connect

    Hirzel, D.R.

    1995-04-27

    Document provides instructions for performing the Operability Test of the 225-WC Wastewater Sampling Station which monitors the discharge to the Treated Effluent Disposal Facility from the Plutonium Finishing Plant. This Operability Test Procedure (OTP) has been prepared to verify correct configuration and performance of the PFP Wastewater sampling system installed in Building 225-WC located outside the perimeter fence southeast of the Plutonium Finishing Plant (PFP). The objective of this test is to ensure the equipment in the sampling facility operates in a safe and reliable manner. The sampler consists of two Manning Model S-5000 units which are rate controlled by the Milltronics Ultrasonic flowmeter at manhole No.C4 and from a pH measuring system with the sensor in the stream adjacent to the sample point. The intent of the dual sampling system is to utilize one unit to sample continuously at a rate proportional to the wastewater flow rate so that the aggregate tests are related to the overall flow and thereby eliminate isolated analyses. The second unit will only operate during a high or low pH excursion of the stream (hence the need for a pH control). The major items in this OTP include testing of the Manning Sampler System and associated equipment including the pH measuring and control system, the conductivity monitor, and the flow meter.

  5. The ITER Neutral Beam Test Facility towards SPIDER operation

    NASA Astrophysics Data System (ADS)

    Toigo, V.; Dal Bello, S.; Gaio, E.; Luchetta, A.; Pasqualotto, R.; Zaccaria, P.; Bigi, M.; Chitarin, G.; Marcuzzi, D.; Pomaro, N.; Serianni, G.; Agostinetti, P.; Agostini, M.; Antoni, V.; Aprile, D.; Baltador, C.; Barbisan, M.; Battistella, M.; Boldrin, M.; Brombin, M.; Dalla Palma, M.; De Lorenzi, A.; Delogu, R.; De Muri, M.; Fellin, F.; Ferro, A.; Gambetta, G.; Grando, L.; Jain, P.; Maistrello, A.; Manduchi, G.; Marconato, N.; Pavei, M.; Peruzzo, S.; Pilan, N.; Pimazzoni, A.; Piovan, R.; Recchia, M.; Rizzolo, A.; Sartori, E.; Siragusa, M.; Spada, E.; Spagnolo, S.; Spolaore, M.; Taliercio, C.; Valente, M.; Veltri, P.; Zamengo, A.; Zaniol, B.; Zanotto, L.; Zaupa, M.; Boilson, D.; Graceffa, J.; Svensson, L.; Schunke, B.; Decamps, H.; Urbani, M.; Kushwah, M.; Chareyre, J.; Singh, M.; Bonicelli, T.; Agarici, G.; Garbuglia, A.; Masiello, A.; Paolucci, F.; Simon, M.; Bailly-Maitre, L.; Bragulat, E.; Gomez, G.; Gutierrez, D.; Mico, G.; Moreno, J.-F.; Pilard, V.; Chakraborty, A.; Baruah, U.; Rotti, C.; Patel, H.; Nagaraju, M. V.; Singh, N. P.; Patel, A.; Dhola, H.; Raval, B.; Fantz, U.; Fröschle, M.; Heinemann, B.; Kraus, W.; Nocentini, R.; Riedl, R.; Schiesko, L.; Wimmer, C.; Wünderlich, D.; Cavenago, M.; Croci, G.; Gorini, G.; Rebai, M.; Muraro, A.; Tardocchi, M.; Hemsworth, R.

    2017-08-01

    SPIDER is one of two projects of the ITER Neutral Beam Test Facility under construction in Padova, Italy, at the Consorzio RFX premises. It will have a 100 keV beam source with a full-size prototype of the radiofrequency ion source for the ITER neutral beam injector (NBI) and also, similar to the ITER diagnostic neutral beam, it is designed to operate with a pulse length of up to 3600 s, featuring an ITER-like magnetic filter field configuration (for high extraction of negative ions) and caesium oven (for high production of negative ions) layout as well as a wide set of diagnostics. These features will allow a reproduction of the ion source operation in ITER, which cannot be done in any other existing test facility. SPIDER realization is well advanced and the first operation is expected at the beginning of 2018, with the mission of achieving the ITER heating and diagnostic NBI ion source requirements and of improving its performance in terms of reliability and availability. This paper mainly focuses on the preparation of the first SPIDER operations—integration and testing of SPIDER components, completion and implementation of diagnostics and control and formulation of operation and research plan, based on a staged strategy.

  6. EnergySolution's Clive Disposal Facility Operational Research Model - 13475

    SciTech Connect

    Nissley, Paul; Berry, Joanne

    2013-07-01

    EnergySolutions owns and operates a licensed, commercial low-level radioactive waste disposal facility located in Clive, Utah. The Clive site receives low-level radioactive waste from various locations within the United States via bulk truck, containerised truck, enclosed truck, bulk rail-cars, rail boxcars, and rail inter-modals. Waste packages are unloaded, characterized, processed, and disposed of at the Clive site. Examples of low-level radioactive waste arriving at Clive include, but are not limited to, contaminated soil/debris, spent nuclear power plant components, and medical waste. Generators of low-level radioactive waste typically include nuclear power plants, hospitals, national laboratories, and various United States government operated waste sites. Over the past few years, poor economic conditions have significantly reduced the number of shipments to Clive. With less revenue coming in from processing shipments, Clive needed to keep its expenses down if it was going to maintain past levels of profitability. The Operational Research group of EnergySolutions were asked to develop a simulation model to help identify any improvement opportunities that would increase overall operating efficiency and reduce costs at the Clive Facility. The Clive operations research model simulates the receipt, movement, and processing requirements of shipments arriving at the facility. The model includes shipment schedules, processing times of various waste types, labor requirements, shift schedules, and site equipment availability. The Clive operations research model has been developed using the WITNESS{sup TM} process simulation software, which is developed by the Lanner Group. The major goals of this project were to: - identify processing bottlenecks that could reduce the turnaround time from shipment arrival to disposal; - evaluate the use (or idle time) of labor and equipment; - project future operational requirements under different forecasted scenarios. By identifying

  7. Lunar Transportation Facilities and Operations Study, option 2

    NASA Technical Reports Server (NTRS)

    1992-01-01

    During the Option 2 period of the Lunar Transportation Facilities and Operations Study (LTFOS), a joint McDonnell Douglas Space Systems Company Kennedy Space Center (MDSSC-KSC) and National Aeronautics and Space Administration Kennedy Space Center (NASA-KSC) Study team conducted a comparison of the functional testing of the RL-10 and Space Shuttle Main Engine, a quick-look impact assessment of the Synthesis Group Report, and a detailed assessment of the Synthesis Group Report. The results of these KSC LTFOS team efforts are included. The most recent study task effort was a detailed assessment of the Synthesis Group Report. The assessment was conducted to determine the impact on planetary launch and landing facilities and operations. The result of that effort is a report entitled 'Analysis of the Synthesis Group Report, its Architectures and their Impacts on PSS Launch and Landing Operations' and is contained in Appendix A. The report is structured in a briefing format with facing pages as opposed to a narrative style. A quick-look assessment of the Synthesis Group Report was conducted to determine the impact of implementing the recommendations of the Synthesis Group on KSC launch facilities and operations. The data was documented in a presentation format as requested by Kennedy Space Center Technology and Advanced Projects Office and is included in Appendix B. Appendix C is a white paper on the comparison of the functional testing of the RL-10 and Space Shuttle Main Engine. The comparison was undertaken to provide insight regarding common test requirements that would be applicable to Lunar and Mars Excursion Vehicles (LEV and MEV).

  8. Lunar Transportation Facilities and Operations Study, option 2

    NASA Astrophysics Data System (ADS)

    1992-02-01

    During the Option 2 period of the Lunar Transportation Facilities and Operations Study (LTFOS), a joint McDonnell Douglas Space Systems Company Kennedy Space Center (MDSSC-KSC) and National Aeronautics and Space Administration Kennedy Space Center (NASA-KSC) Study team conducted a comparison of the functional testing of the RL-10 and Space Shuttle Main Engine, a quick-look impact assessment of the Synthesis Group Report, and a detailed assessment of the Synthesis Group Report. The results of these KSC LTFOS team efforts are included. The most recent study task effort was a detailed assessment of the Synthesis Group Report. The assessment was conducted to determine the impact on planetary launch and landing facilities and operations. The result of that effort is a report entitled 'Analysis of the Synthesis Group Report, its Architectures and their Impacts on PSS Launch and Landing Operations' and is contained in Appendix A. The report is structured in a briefing format with facing pages as opposed to a narrative style. A quick-look assessment of the Synthesis Group Report was conducted to determine the impact of implementing the recommendations of the Synthesis Group on KSC launch facilities and operations. The data was documented in a presentation format as requested by Kennedy Space Center Technology and Advanced Projects Office and is included in Appendix B. Appendix C is a white paper on the comparison of the functional testing of the RL-10 and Space Shuttle Main Engine. The comparison was undertaken to provide insight regarding common test requirements that would be applicable to Lunar and Mars Excursion Vehicles (LEV and MEV).

  9. SSBRP User Operations Facility (UOF) Overview and Development Strategy

    NASA Technical Reports Server (NTRS)

    Picinich, Lou; Stone, Thom; Sun, Charles; Windrem, May; Givens, John J. (Technical Monitor)

    1995-01-01

    This paper will present the Space Station Biological Research Project (SSBRP) User Operations Facility (UOF) architecture and development strategy. A major element of the UOF at NASA Ames Research Center, the Communication and Data System (CDS) will be the primary focus of the discussions. CDS operational, telescience, security, and development objectives will be discussed along with CDS implementation strategy. The implementation strategy discussions will include: Object Oriented Analysis & Design, System & Software Prototyping, and Technology Utilization. A CDS design overview that includes: CDS Context Diagram, CDS Architecture, Object Models, Use Cases, and User Interfaces will also be presented. CDS development brings together "cutting edge" technologies and techniques such as: object oriented development, network security, multimedia networking, web-based data distribution, JAVA, and graphical user interfaces. Use of these "cutting edge" technologies and techniques translates directly to lower development and operations costs.

  10. Five years operating experience at the Fast Flux Test Facility

    SciTech Connect

    Baumhardt, R. J.; Bechtold, R. A.

    1987-04-01

    The Fast Flux Test Facility (FFTF) is a 400 Mw(t), loop-type, sodium-cooled, fast neutron reactor. It is operated by the Westinghouse Hanford Company for the United States Department of Energy at Richland, Washington. The FFTF is a multipurpose test reactor used to irradiate fuels and materials for programs such as Liquid Metal Reactor (LMR) research, fusion research, space power systems, isotope production and international research. FFTF is also used for testing concepts to be used in Advanced Reactors which will be designed to maximize passive safety features and not require complex shutdown systems to assure safe shutdown and heat removal. The FFTF also provides experience in the operation and maintenance of a reactor having prototypic components and systems typical of large LMR (LMFBR) power plants. The 5 year operational performance of the FFTF reactor is discussed in this report. 6 refs., 10 figs., 2 tabs.

  11. Report of the Task Group on operation Department of Energy tritium facilities

    SciTech Connect

    Not Available

    1991-10-01

    This report discusses the following topics on the operation of DOE Tritium facilities: Environment, Safety, and Health Aspects of Tritium; Management of Operations and Maintenance Functions; Safe Shutdown of Tritium Facilities; Management of the Facility Safety Envelope; Maintenance of Qualified Tritium Handling Personnel; DOE Tritium Management Strategy; Radiological Control Philosophy; Implementation of DOE Requirements; Management of Tritium Residues; Inconsistent Application of Requirements for Measurement of Tritium Effluents; Interdependence of Tritium Facilities; Technical Communication among Facilities; Incorporation of Confinement Technologies into New Facilities; Operation/Management Requirements for New Tritium Facilities; and Safety Management Issues at Department of Energy Tritium Facilities.

  12. Personnel Access Control System Evaluation for National Ignition Facility Operations

    SciTech Connect

    Altenbach, T; Brereton, S.; Hermes, G.; Singh, M.

    2001-06-01

    The purpose of this document is to analyze the baseline Access Control System for the National Ignition Facility (NIF), and to assess its effectiveness at controlling access to hazardous locations during full NIF operations. It reviews the various hazards present during a NIF shot sequence, and evaluates the effectiveness of the applicable set of controls at preventing access while the hazards are present. It considers only those hazards that could potentially be lethal. In addition, various types of technologies that might be applicable at NIF are reviewed, as are systems currently in use at other facilities requiring access control for safety reasons. Recommendations on how this system might be modified to reduce risk are made.

  13. 78 FR 37660 - American Surface Lines, LLC-Acquisition and Operation Exemption-Mikrut Properties, LLLP

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... Canadian Pacific Railroad Company (CP) at or near Pelzer Street to a transloading facility owned and... tracks that connect to CP's line have been operated pursuant to a private siding agreement between CP...

  14. 3. EXTERIOR VIEW TO THE NORTHEAST OF A RAILROAD CAR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. EXTERIOR VIEW TO THE NORTHEAST OF A RAILROAD CAR ON THE TRACKS AND THE PARTS OF AN ENGINE STAND. - Nevada Test Site, Pluto Facility, Area 26, Wahmonie Flats, Cane Spring Road, Mercury, Nye County, NV

  15. 30. West view, showing court in storehouse #1 adn railroad ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. West view, showing court in storehouse #1 adn railroad facilities connecting with yards and float bridges at thirty-eighth street. - U.S. Navy Fleet Supply Base, Storehouse No. 1, 830 Third Avenue, Brooklyn, Kings County, NY

  16. Operational Concept for the Smart Landing Facility (SLF)

    NASA Technical Reports Server (NTRS)

    Thompson, S. D.; Bussolari, S. R.

    2001-01-01

    The purpose of this document is to describe an operational concept for the Smart Landing Facility (SLF). The SLF is proposed as a component of the Small Aircraft Transportation System (SATS) and is envisioned to utilize Communication, Navigation, Surveillance and Air Traffic Management (CNS/ATM) technologies to support higher-volume air traffic operations in a wider variety of weather conditions than are currently possible at airports without an Air Traffic Control Tower (ATCT) or Terminal Radar Approach Control (TRACON). In order to accomplish this, the SLF will provide aircraft sequencing and separation within its terminal airspace (the SLF traffic area) and on the airport surface. The approach taken in this report is to first define and describe the SLF environment and the type of operations and aircraft that must be supported. Services currently provided by an ATCT and TRACON are reviewed and assembled into a set of high-level operational functions. A description of the applicable CNS/ATM technologies that have been deployed in the NAS (National Airspace System) or have been demonstrated to be operationally feasible is presented. A candidate SLF system concept that employs the CNS/ATM technologies is described. This is followed by SLF operational scenarios for minimally-equipped aircraft and for aircraft fully-equipped to make full use of SLF services. An assessment is made of the SLF technology and key research issues are identified.

  17. Raccoon Mountain pumped-storage facility operational fish monitoring report

    SciTech Connect

    Buchanan, J.P.; Pasch, R.W.; Smith, A.O.; Swor, C.T.; Tomljanovich, D.A.

    1983-09-01

    The impact of the Raccoon Mountain Pumped-Storage Facility operations on fisheries resources in the Nickajack Reservoir was investigated. Analyses of data collected from 1979 through 1981 on population status and distribution of adults, larvae and eggs are presented with comparisons of preoperational fisheries monitoring data collected by the TVA from 1977 through 1978. Although minor differences in composition of dominant species, and slight declines in standing stock of some species were noted, no major impacts were identified. Appendix B contains a short report entitled Nickajack Reservoir Ictiobine Study 1979 by Edwin Scott Jr. 7 references, 46 figures, 31 tables.

  18. Skylab Medical Experiments Altitude Test /SMEAT/ facility design and operation.

    NASA Technical Reports Server (NTRS)

    Hinners, A. H., Jr.; Correale, J. V.

    1973-01-01

    This paper presents the design approaches and test facility operation methods used to successfully accomplish a 56-day test for Skylab to permit evaluation of selected Skylab medical experiments in a ground test simulation of the Skylab environment with an astronaut crew. The systems designed for this test include the two-gas environmental control system, the fire suppression and detection system, equipment transfer lock, ground support equipment, safety systems, potable water system, waste management system, lighting and power system, television monitoring, communications and recreation systems, and food freezer.

  19. Solar and Heliospheric Observatory (SOHO) Experimenters' Operations Facility (EOF)

    NASA Technical Reports Server (NTRS)

    Larduinat, Eliane; Potter, William

    1994-01-01

    This paper describes the SOHO Instrumenters' Operations Facility (EOF) project. The EOF is the element of the SOHO ground system at the Goddard Space Flight Center that provides the interface between the SOHO scientists and the other ground system elements. This paper first describes the development context of the SOHO EOF. It provides an overview of the SOHO mission within the International Solar-Terrestrial Physics (ISTP) project, and discusses the SOHO scientific objectives. The second part of this paper presents the implementation of the SOHO EOF, its innovative features, its possible applications to other missions, and its potential for use as part of a fully integrated ground control system.

  20. Skylab Medical Experiments Altitude Test /SMEAT/ facility design and operation.

    NASA Technical Reports Server (NTRS)

    Hinners, A. H., Jr.; Correale, J. V.

    1973-01-01

    This paper presents the design approaches and test facility operation methods used to successfully accomplish a 56-day test for Skylab to permit evaluation of selected Skylab medical experiments in a ground test simulation of the Skylab environment with an astronaut crew. The systems designed for this test include the two-gas environmental control system, the fire suppression and detection system, equipment transfer lock, ground support equipment, safety systems, potable water system, waste management system, lighting and power system, television monitoring, communications and recreation systems, and food freezer.

  1. Management aspects of Gemini's base facility operations project

    NASA Astrophysics Data System (ADS)

    Arriagada, Gustavo; Nitta, Atsuko; Adamson, A. J.; Nunez, Arturo; Serio, Andrew; Cordova, Martin

    2016-08-01

    Gemini's Base Facilities Operations (BFO) Project provided the capabilities to perform routine nighttime operations without anyone on the summit. The expected benefits were to achieve money savings and to become an enabler of the future development of remote operations. The project was executed using a tailored version of Prince2 project management methodology. It was schedule driven and managing it demanded flexibility and creativity to produce what was needed, taking into consideration all the constraints present at the time: Time available to implement BFO at Gemini North (GN), two years. The project had to be done in a matrix resources environment. There were only three resources assigned exclusively to BFO. The implementation of new capabilities had to be done without disrupting operations. And we needed to succeed, introducing the new operational model that implied Telescope and instrumentation Operators (Science Operations Specialists - SOS) relying on technology to assess summit conditions. To meet schedule we created a large number of concurrent smaller projects called Work Packages (WP). To be reassured that we would successfully implement BFO, we initially spent a good portion of time and effort, collecting and learning about user's needs. This was done through close interaction with SOSs, Observers, Engineers and Technicians. Once we had a clear understanding of the requirements, we took the approach of implementing the "bare minimum" necessary technology that would meet them and that would be maintainable in the long term. Another key element was the introduction of the "gradual descent" concept. In this, we increasingly provided tools to the SOSs and Observers to prevent them from going outside the control room during nighttime operations, giving them the opportunity of familiarizing themselves with the new tools over a time span of several months. Also, by using these tools at an early stage, Engineers and Technicians had more time for debugging

  2. The Injection Facility at Ketzin: Technical Installations & Operation

    NASA Astrophysics Data System (ADS)

    Moeller, F.; Bannach, A.; Becker, W.; Koehler, S.

    2009-04-01

    The injection facility consists of 5 main plunger pumps (0…1.000 kg/h), a heating device (305 kWel.) and two intermediate storage tanks (50 to, each). One additional smaller pump has been installed to allow for smaller injection rates (around 300 kg/h). The facility is designed to implement a CO2 stream of 300 kg/h to 3.250 kg/h (200 kg/h stepwise) at 50 °C at the heater outlet, resulting in a maximum amount of 78 to per day. An overall control and automation system is in place for steering the entire injection process and monitoring the relevant parameters (i.e. CO2 flow, temperature along the injection string, pressure data from the formation and the wellheads etc.). All emergency shut-down (ESD) functionality is software independent and has been certified by local authorities and technical control boards. Besides the presentation of of the technical facilities the talk will give an overview on the legal organisation of the injection operation and will light on so far experienced wellbore and reservoir behaviour.

  3. The operator interface for the Mirror Fusion Test Facility

    SciTech Connect

    Lang, N.C.

    1986-12-01

    The uncertain and most likely changing nature of a large experimental facility like MFTF, as well as its large number of control and monitor points, ruled against the traditional hardware approach involving walls of knobs, dials, oscilloscopes, and strip chart recorders. Rather, from the beginning, project management specified computer control of all systems, and operation of the complete MFTF under an integrated computer control system became a major engineering goal. The Integrated Controls and Diagnostics (ICADS) group was charged with the design and implementation of this control system. We designed a control system with an extremely flexible operator interface which uses computer generated CRT displays for output and pointing devices such as touch sensitive CRT overlays, mice, and joysticks for input. Construction of MFTF was completed at the end of 1985 within the project budget of $241.6M and was followed immediately by a 5 month long acceptance test. During this period (known as PACE test) operators, engineers, and physicists successfully used our computer control system daily to test MFTF. Much of their willingness to forsake the traditional hands-on hardware approach to testing was a result of the powerful and flexible operator interface to the MFTF control system. In this paper, we describe the operator interface with emphasis on the displays, the touch screens, and the mouse. We also report the experiences of users and, in particular, stress those aspects of the user interface they strongly liked and disliked.

  4. The Mulberry Cogeneration Facility: Design features and operating success

    SciTech Connect

    Jasper, W.M.; Wierschem, R.A.; Gray, D.C.

    1995-12-31

    The Mulberry Cogeneration Facility is in successful, reliable, and profitable service, with the complex requirements of zero discharge, extensive water treatment, process steam supply, and inlet chillers having been reduced to routine, automated operation. What was initially visualized by the developer as a straightforward combined cycle plant became much more than that as the various requirements for environmental and regulatory compliance became necessities, along with the desire to maximize output and revenues in response to growing power demands. A delicate balance exists between a financially successful cogeneration project and the Owners` obligation to the community and the environment. As competitive pressures grow and expectations of investors, insurers, operators, and the public increase, still more creativity will be required to provide a safe, reliable, cost-effective plant on ever shorter schedules.

  5. Space ultra-vacuum facility and method of operation

    NASA Technical Reports Server (NTRS)

    Naumann, Robert J. (Inventor)

    1988-01-01

    A wake shield space processing facility (10) for maintaining ultra-high levels of vacuum is described. The wake shield (12) is a truncated hemispherical section having a convex side (14) and a concave side (24). Material samples (68) to be processed are located on the convex side of the shield, which faces in the wake direction in operation in orbit. Necessary processing fixtures (20) and (22) are also located on the convex side. Support equipment including power supplies (40, 42), CMG package (46) and electronic control package (44) are located on the convex side (24) of the shield facing the ram direction. Prior to operation in orbit the wake shield is oriented in reverse with the convex side facing the ram direction to provide cleaning by exposure to ambient atomic oxygen. The shield is then baked-out by being pointed directed at the sun to obtain heating for a suitable period.

  6. Kistler reusable vehicle facility design and operational approach

    NASA Astrophysics Data System (ADS)

    Fagan, D.; McInerney, F.; Johnston, C.; Tolson, B.

    Kistler Aerospace Corporation is designing and developing the K-1, the world's first fully reusable aerospace vehicle to deliver satellites into orbit. The K-1 vehicle test program will be conducted in Woomera, Australia, with commercial operations scheduled to begin shortly afterwards. Both stages of the K-1 will return to the launch site utilizing parachutes and airbags for a soft landing within 24 h after launch. The turnaround flow of the two stages will cycle from landing site to a maintenance/refurbishment facility and through the next launch in only 9 days. Payload processing will occur in a separate facility in parallel with recovery and refurbishment operations. The vehicle design and on-board checkout capability of the avionics system eliminates the need for an abundance of ground checkout equipment. Payload integration, vehicle assembly, and K-1 transport to the launch pad will be performed horizontally, simplifying processing and reducing infrastructure requirements. This simple, innovative, and cost-effective approach will allow Kistler to offer its customers flexible, low-cost, and on-demand launch services.

  7. 7 CFR 70.110 - Requirements for sanitation, facilities, and operating procedures in official plants.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 3 2013-01-01 2013-01-01 false Requirements for sanitation, facilities, and operating... Requirements for sanitation, facilities, and operating procedures in official plants. (a) The requirements for sanitation, facilities, and operating procedures in official plants shall be the applicable provisions...

  8. 7 CFR 70.110 - Requirements for sanitation, facilities, and operating procedures in official plants.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 3 2014-01-01 2014-01-01 false Requirements for sanitation, facilities, and operating... Requirements for sanitation, facilities, and operating procedures in official plants. (a) The requirements for sanitation, facilities, and operating procedures in official plants shall be the applicable provisions...

  9. 7 CFR 70.110 - Requirements for sanitation, facilities, and operating procedures in official plants.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Requirements for sanitation, facilities, and operating... Requirements for sanitation, facilities, and operating procedures in official plants. (a) The requirements for sanitation, facilities, and operating procedures in official plants shall be the applicable provisions...

  10. 7 CFR 70.110 - Requirements for sanitation, facilities, and operating procedures in official plants.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Requirements for sanitation, facilities, and operating... Requirements for sanitation, facilities, and operating procedures in official plants. (a) The requirements for sanitation, facilities, and operating procedures in official plants shall be the applicable provisions...

  11. 49 CFR 210.7 - Responsibility for noise defective railroad equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... that uses railroad equipment that is noise defective or engages in a car coupling operating that... defect; (b) Remove the noise defective railroad equipment from service; or (c) Modify the car...

  12. 49 CFR 210.7 - Responsibility for noise defective railroad equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... that uses railroad equipment that is noise defective or engages in a car coupling operating that... defect; (b) Remove the noise defective railroad equipment from service; or (c) Modify the car...

  13. 49 CFR 210.7 - Responsibility for noise defective railroad equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... that uses railroad equipment that is noise defective or engages in a car coupling operating that... defect; (b) Remove the noise defective railroad equipment from service; or (c) Modify the car...

  14. Operation and Maintenance of Water Pollution Control Facilities: A WPCF White Paper.

    ERIC Educational Resources Information Center

    Hill, William R.; And Others

    1979-01-01

    Presented are the recommendations of the Water Pollution Control Federation for operation and maintenance consideration during the planning design, construction, and operation of wastewater treatment facilities. (CS)

  15. Operation and Maintenance of Water Pollution Control Facilities: A WPCF White Paper.

    ERIC Educational Resources Information Center

    Hill, William R.; And Others

    1979-01-01

    Presented are the recommendations of the Water Pollution Control Federation for operation and maintenance consideration during the planning design, construction, and operation of wastewater treatment facilities. (CS)

  16. 77 FR 12366 - JP Rail, Inc. d/b/a Southern Railroad Company of New Jersey-Operation Exemption-Rail Line in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... Exemption--Rail Line in Salem County, N.J. JP Rail, Inc. d/b/a Southern Railroad Company of New Jersey (JP... Salem County, N.J. (Salem), as follows: (1) Between the connection with Consolidated Rail Corporation at approximately milepost 11.0 in Swedesboro, N.J., and approximately milepost 28.4 at Salem, and (2) the...

  17. New regulations on railroad bridge safety: opportunities and challenges for railroad bridge monitoring

    NASA Astrophysics Data System (ADS)

    Moreu, Fernando; LaFave, James M.; Spencer, Billie F.

    2012-04-01

    New federal regulations now mandate North American railroad bridge owners to closely assess the structural capacity of their bridges. Consequently, railroad companies are currently looking into developing and exploring monitoring systems for specific bridges, to help them improve and develop bridge safety in order to help comply with this new rule. The first part of this paper explains the significance of the new federal law. The new rule comes from the Federal Railroad Administration (FRA), Department of Transportation (DOT), and it falls under the 49 Code of Federal Regulations (CFR), Parts 213 and 2371. It requires railroad track owners to know the safe capacity of their bridges and to additionally conduct special inspections if either weather or other exceptional conditions make them necessary to ensure safe railroad bridge operations. The second part of this paper will cover past and current studies about the viability of bridge health monitoring, and actual structural monitoring experiences for railroad bridges. Finally, lessons learned from these monitoring examples, as well as recommendations for future applications, are suggested, including wireless monitoring strategies for railroad bridges such as: campaign sensing inspections (periodic monitoring); bridge replacement observations (short term monitoring); and permanent bridge instrumentation (long term monitoring).

  18. 49 CFR 220.302 - Operating rules implementing the requirements of this subpart.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.302 Operating rules implementing the requirements of this subpart. Each railroad shall adopt...

  19. 49 CFR 220.302 - Operating rules implementing the requirements of this subpart.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.302 Operating rules implementing the requirements of this subpart. Each railroad shall adopt...

  20. 49 CFR 220.302 - Operating rules implementing the requirements of this subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.302 Operating rules implementing the requirements of this subpart. Each railroad shall adopt...

  1. 49 CFR 220.302 - Operating rules implementing the requirements of this subpart.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.302 Operating rules implementing the requirements of this subpart. Each railroad shall adopt...

  2. 49 CFR 220.302 - Operating rules implementing the requirements of this subpart.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Electronic Devices § 220.302 Operating rules implementing the requirements of this subpart. Each railroad shall adopt...

  3. Regulation study for the facility control system design at the Facility Operations Center at TA55

    SciTech Connect

    1994-03-16

    NMT-8 is proposing to upgrade the existing Facility Control System (FCS) located within the Facility Operations Center (FOC) at the TA-55 Plutonium Processing and Handling Facility (PPHF). The FCS modifications will upgrade the existing electronics to provide better reliability of system functions. Changes include replacement of the FCS computers and field multiplex units which are used for transmitting systems data. Data collected at the FCS include temperature, pressure, contact closures, etc., and are used for monitoring and/or control of key systems at TA-55. Monitoring is provided for the electrical power system status, PF-4 HVAC air balance status (Static Differential pressure), HVAC fan system status, site chill water return temperature, fire system information, and radioactive constant air monitors alarm information, site compressed air pressure and other key systems used at TA-55. Control output signals are provided for PF-4 HVAC systems, and selected alarms for criticality, fire, loss of pressure in confinement systems. A detailed description of the FCS modifications is provided in Section 2.

  4. 10 CFR 60.132 - Additional design criteria for surface facilities in the geologic repository operations area.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the geologic repository operations area. (a) Facilities for receipt and retrieval of waste. Surface... emplacement or as a result of retrieval from the underground facility. (b) Surface facility...

  5. 10 CFR 60.132 - Additional design criteria for surface facilities in the geologic repository operations area.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the geologic repository operations area. (a) Facilities for receipt and retrieval of waste. Surface... emplacement or as a result of retrieval from the underground facility. (b) Surface facility...

  6. Proton Therapy Facility Planning From a Clinical and Operational Model.

    PubMed

    Das, Indra J; Moskvin, Vadim P; Zhao, Qingya; Cheng, Chee-Wai; Johnstone, Peter A

    2015-10-01

    This paper provides a model for planning a new proton therapy center based on clinical data, referral pattern, beam utilization and technical considerations. The patient-specific data for the depth of targets from skin in each beam angle were reviewed at our center providing megavoltage photon external beam and proton beam therapy respectively. Further, data on insurance providers, disease sites, treatment depths, snout size and the beam angle utilization from the patients treated at our proton facility were collected and analyzed for their utilization and their impact on the facility cost. The most common disease sites treated at our center are head and neck, brain, sarcoma and pediatric malignancies. From this analysis, it is shown that the tumor depth from skin surface has a bimodal distribution (peak at 12 and 26 cm) that has significant impact on the maximum proton energy, requiring the energy in the range of 130-230 MeV. The choice of beam angles also showed a distinct pattern: mainly at 90° and 270°; this indicates that the number of gantries may be minimized. Snout usage data showed that 70% of the patients are treated with 10 cm snouts. The cost of proton beam therapy depends largely on the type of machine, maximum beam energy and the choice of gantry versus fixed beam line. Our study indicates that for a 4-room center, only two gantry rooms could be needed at the present pattern of the patient cohorts, thus significantly reducing the initial capital cost. In the USA, 95% and 100% of patients can be treated with 200 and 230 MeV proton beam respectively. Use of multi-leaf collimators and pencil beam scanning may further reduce the operational cost of the facility.

  7. Performance and Operational Modeling of the National Ignition Facility

    SciTech Connect

    Shaw, M; Williams, W; Jancaitis, K; Widmayer, C; House, R

    2003-07-01

    The National Ignition Facility (NIF), currently under construction at the University of California's Lawrence Livermore National Laboratory (LLNL) is a stadium-sized facility containing a 192-beam, 1.8 Megajoule, 500-Terrawatt, 351-nm laser system together with a 10-meter diameter target chamber with room for nearly 100 experimental diagnostics. NIF is being built by the National Nuclear Security Administration and when completed will be the world's largest laser experimental system, providing a national center to study inertial confinement fusion and the physics of matter at extreme energy densities and pressures. NIF's 192 energetic laser beams will compress fusion targets to conditions where they will ignite and burn, liberating more energy than required to initiate the fusion reaction. The first four beamlines (a quad) are currently being commissioned, with increasingly energetic laser pulses being propagated throughout the laser system. Success on many of the NIF laser's missions depends on obtaining precisely specified energy waveforms from each of the 192 beams over a wide variety of pulse lengths and temporal shapes. A computational system, the Laser Performance Operations Model (LPOM) has been developed and deployed during NIF commissioning to automate the laser setup process, and accurately predict laser energetics. For each shot on NIF, the LPOM determines the characteristics of the injection laser system required to achieve the desired main laser output, provides parameter checking for equipment protection, determines the required diagnostic setup, and supplies post-shot data analysis and reporting.

  8. MagLev Cobra: Test Facilities and Operational Experiments

    NASA Astrophysics Data System (ADS)

    Sotelo, G. G.; Dias, D. H. J. N.; de Oliveira, R. A. H.; Ferreira, A. C.; De Andrade, R., Jr.; Stephan, R. M.

    2014-05-01

    The superconducting MagLev technology for transportation systems is becoming mature due to the research and developing effort of recent years. The Brazilian project, named MagLev-Cobra, started in 1998. It has the goal of developing a superconducting levitation vehicle for urban areas. The adopted levitation technology is based on the diamagnetic and the flux pinning properties of YBa2Cu3O7-δ (YBCO) bulk blocks in the interaction with Nd-Fe-B permanent magnets. A laboratory test facility with permanent magnet guideway, linear induction motor and one vehicle module is been built to investigate its operation. The MagLev-Cobra project state of the art is presented in the present paper, describing some construction details of the new test line with 200 m.

  9. Umatilla Hatchery Satellite Facilities Operation and Maintenance; 1995 Annual Report.

    SciTech Connect

    Rowan, Gerald D.

    1996-05-01

    The Confederated Tribes of the Umatilla Indian Reservoir (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead, fall chinook and coho salmon. Personnel from the ODFW Eastern Oregon Fish Pathology Laboratory in La Grande took samples of tissues and reproductive fluids from Umatilla River summer steelhead and coho salmon broodstock for monitoring and evaluation purposes. Coded-wire tag recovery information was accessed to determine the contribution of Umatilla river releases to ocean, Columbia River and Umatilla River fisheries.

  10. View looking due east along Pennsylvania railroad, showing underside of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View looking due east along Pennsylvania railroad, showing underside of bascule leaf. Note that reduction gears and pinion operate rack mounted to bottom of girders. - Philadelphia, Baltimore & Washington Railroad, Darby River Bridge, Spanning Darby Creek, South of Essington Avenue (State Route 291), Eddystone, Delaware County, PA

  11. Upgrading railroad test track, Pueblo, Colorado

    SciTech Connect

    Briggs, K. III; Chamberlain, K.

    1997-01-01

    The railroad test track (RTT) at the Transportation Technology Center (TTC) in Pueblo, Colo., was constructed in the early 1970s to support high-speed testing of new railroad rolling stock. Through the years it has been used to test a wide range of railroad passenger and freight cars and locomotives. Now, 20 years later, a new high-speed train set is being procured by Amtrak for service in the improved Northeast Corridor. The test facilities at Pueblo will play an important role in acceptance and safety testing of new high-speed train sets in the US. The Federal Railroad Administration (FRA) commissioned a study to review the existing condition of the test track and to make recommendations as to possible improvement options so that the facility would be able to test current and future generations of high-speed rail equipment. This paper describes the condition of the test track and explores ways in which it may be modified to accommodate the testing of high-speed train technologies in the near future and into the next century.

  12. Justification for Continued Operation of the SRS Saltstone Facility (Z-Area)

    SciTech Connect

    Wagner, W.A.

    1999-01-20

    Saltstone Production and Disposal Facilities (Z-Area) are a part of the Defense Waste Processing Facilities (DWPF). Z-Area facilities are just one segment of an integrated waste management and disposal system located at the Savannah River Site (SRS). The bases for the Justification of Continuing Operations (JCO) of the Saltstone Production and Disposal Facilities (Z-Area) at SRS are provided.

  13. Transuranic (Tru) waste volume reduction operations at a plutonium facility

    SciTech Connect

    Cournoyer, Michael E; Nixon, Archie E; Dodge, Robert L; Fife, Keith W; Sandoval, Arnold M; Garcia, Vincent E

    2010-01-01

    Programmatic operations at the Los Alamos National Laboratory Plutonium Facility (TA 55) involve working with various amounts of plutonium and other highly toxic, alpha-emitting materials. The spread of radiological contamination on surfaces, airborne contamination, and excursions of contaminants into the operator's breathing zone are prevented through use of a variety of gloveboxes (the glovebox, coupled with an adequate negative pressure gradient, provides primary confinement). Size-reduction operations on glovebox equipment are a common activity when a process has been discontinued and the room is being modified to support a new customer. The Actin ide Processing Group at TA-55 uses one-meter-long glass columns to process plutonium. Disposal of used columns is a challenge, since they must be size-reduced to get them out of the glovebox. The task is a high-risk operation because the glass shards that are generated can puncture the bag-out bags, leather protectors, glovebox gloves, and the worker's skin when completing the task. One of the Lessons Learned from these operations is that Laboratory management should critically evaluate each hazard and provide more effective measures to prevent personnel injury. A bag made of puncture-resistant material was one of these enhanced controls. We have investigated the effectiveness of these bags and have found that they safely and effectively permit glass objects to be reduced to small pieces with a plastic or rubber mallet; the waste can then be easily poured into a container for removal from the glove box as non-compactable transuranic (TRU) waste. This size-reduction operation reduces solid TRU waste generation by almost 2% times. Replacing one-time-use bag-out bags with multiple-use glass crushing bags also contributes to reducing generated waste. In addition, significant costs from contamination, cleanup, and preparation of incident documentation are avoided. This effort contributes to the Los Alamos National

  14. 7 CFR 319.40-8 - Processing at facilities operating under compliance agreements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 5 2012-01-01 2012-01-01 false Processing at facilities operating under compliance..., Lumber, and Other Unmanufactured Wood Articles § 319.40-8 Processing at facilities operating under... plant pests from the facility, requirements to ensure the processing method effectively destroys plant...

  15. WIPP Remote Handled Waste Facility: Performance Dry Run Operations

    SciTech Connect

    Burrington, T. P.; Britain, R. M.; Cassingham, S. T.

    2003-02-24

    The Remote Handled (RH) TRU Waste Handling Facility at the Waste Isolation Pilot Plant (WIPP) was recently upgraded and modified in preparation for handling and disposal of RH Transuranic (TRU) waste. This modification will allow processing of RH-TRU waste arriving at the WIPP site in two different types of shielded road casks, the RH-TRU 72B and the CNS 10-160B. Washington TRU Solutions (WTS), the WIPP Management and Operation Contractor (MOC), conducted a performance dry run (PDR), beginning August 19, 2002 and successfully completed it on August 24, 2002. The PDR demonstrated that the RHTRU waste handling system works as designed and demonstrated the handling process for each cask, including underground disposal. The purpose of the PDR was to develop and implement a plan that would define in general terms how the WIPP RH-TRU waste handling process would be conducted and evaluated. The PDR demonstrated WIPP operations and support activities required to dispose of RH-TRU waste in the WIPP underground.

  16. Development and operation of a mobile test facility for education

    NASA Astrophysics Data System (ADS)

    Davis, Christopher T.

    The automotive industry saw a large shift towards vehicle electrification after the turn of the century. It became necessary to ensure that new and existing engineers were qualified to design and calibrate these new systems. To ensure this training, Michigan Tech received a grant to develop a curriculum based around vehicle electrification. As part of this agenda, the Michigan Tech Mobile Laboratory was developed to provide hands-on training for professional engineers and technicians in hybrid electric vehicles and vehicle electrification. The Mobile Lab has since then increased the scope of the delivered curriculum to include other automotive areas and even customizable course content to meet specific needs. This thesis outlines the development of the Mobile Laboratory and its powertrain test facilities. The focus of this thesis is to discuss the different hardware and software systems within the lab and test cells. Detailed instructions on the operation and maintenance of each of the systems are discussed. In addition, this thesis outlines the setup and operation of the necessary equipment for several of the experiments for the on and off campus courses and seminars.

  17. 49 CFR 1.89 - Delegations to the Federal Railroad Adminstrator.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false Delegations to the Federal Railroad Adminstrator... DELEGATION OF POWERS AND DUTIES Operating Administrations § 1.89 Delegations to the Federal Railroad Adminstrator. The Federal Railroad Administrator is delegated authority to: (a) Carry out the functions...

  18. 49 CFR 1.89 - Delegations to the Federal Railroad Adminstrator.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 1 2014-10-01 2014-10-01 false Delegations to the Federal Railroad Adminstrator... DELEGATION OF POWERS AND DUTIES Operating Administrations § 1.89 Delegations to the Federal Railroad Adminstrator. The Federal Railroad Administrator is delegated authority to: (a) Carry out the functions...

  19. 77 FR 27856 - Tennessee Southern Railroad Company, Patriot Rail, LLC, Patriot Rail Holdings LLC, and Patriot...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... LLC, and Patriot Rail Corp.--Continuance in Control Exemption--Kingman Terminal Railroad, LLC... notice of exemption under 49 CFR 180.2(d)(2) to continue in control of Kingman Terminal Railroad, LLC... filed verified notice of exemption in Kingman Terminal Railroad, LLC--Operation Exemption--...

  20. 75 FR 79086 - Mohall Central Railroad, Inc.-Abandonment Exemption-in Cavalier County, ND

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ... Surface Transportation Board Mohall Central Railroad, Inc.--Abandonment Exemption--in Cavalier County, ND Mohall Central Railroad, Inc. (MCR) filed a verified notice of exemption under 49 CFR part 1152 subpart F... 58323 and 58372. \\1\\ In Northern Plains Railroad--Operation Exemption--Rail Line of Mohall Central...

  1. 76 FR 25588 - Hours of Service Exception for Railroad Signal Employees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-05

    ... Railroad Signal Employees AGENCY: Federal Motor Carrier Safety Administration (FMCSA), DOT. ACTION: Final...) regulations to adopt regulatory language consistent with the statutory exemption for certain railroad signal employees operating commercial motor vehicles (CMVs) in connection with railroad signal work. This is in...

  2. Global Pursuits: The Underground Railroad

    ERIC Educational Resources Information Center

    School Arts: The Art Education Magazine for Teachers, 2004

    2004-01-01

    This brief article describes Charles T. Webber's oil on canvas painting, "The Underground Railroad, 1893." The subject of this painting is the Underground Railroad, which today has become an American legend. The Underground Railroad was not a systematic means of transportation, but rather a secretive process that allowed fugitive slaves…

  3. Global Pursuits: The Underground Railroad

    ERIC Educational Resources Information Center

    School Arts: The Art Education Magazine for Teachers, 2004

    2004-01-01

    This brief article describes Charles T. Webber's oil on canvas painting, "The Underground Railroad, 1893." The subject of this painting is the Underground Railroad, which today has become an American legend. The Underground Railroad was not a systematic means of transportation, but rather a secretive process that allowed fugitive slaves…

  4. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program : Facility Operation and Maintenance Facilities, Annual Report 2003.

    SciTech Connect

    McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie

    2004-01-01

    Anadromous salmonid stocks have declined in both the Grande Ronde River Basin (Lower Snake River Compensation Plan (LSRCP) Status Review Symposium 1998) and in the entire Snake River Basin (Nehlsen et al. 1991), many to the point of extinction. The Grande Ronde River Basin historically supported large populations of fall and spring chinook (Oncorhynchus tshawytscha), sockeye (O. nerka), and coho (O. kisutch) salmon and steelhead trout (O. mykiss) (Nehlsen et al. 1991). The decline of chinook salmon and steelhead populations and extirpation of coho and sockeye salmon in the Grande Ronde River Basin was, in part, a result of construction and operation of hydroelectric facilities, over fishing, and loss and degradation of critical spawning and rearing habitat in the Columbia and Snake River basins (Nehlsen et al. 1991). Hatcheries were built in Oregon, Washington and Idaho under the Lower Snake River Compensation Plan (LSRCP) to compensate for losses of anadromous salmonids due to the construction and operation of the lower four Snake River dams. Lookingglass Hatchery (LGH) on Lookingglass Creek, a tributary of the Grande Ronde River, was completed under LSRCP in 1982 and has served as the main incubation and rearing site for chinook salmon programs for Grande Ronde and Imnaha rivers in Oregon. Despite these hatchery programs, natural spring chinook populations continued to decline resulting in the National Marine Fisheries Service (NMFS) listing Snake River spring/summer chinook salmon as ''threatened'' under the federal Endangered Species Act (1973) on 22 April 1992. Continuing poor escapement levels and declining population trends indicated that Grande Ronde River basin spring chinook salmon were in imminent danger of extinction. These continuing trends led fisheries co-managers in the basin to initiate the Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSSP) in order to prevent extinction and preserve options for use of endemic fish stocks

  5. Developing operating procedures for a low-level radioactive waste disposal facility

    SciTech Connect

    Sutherland, A.A.; Miner, G.L.; Grahn, K.F.; Pollard, C.G.

    1993-10-01

    This document is intended to assist persons who are developing operating and emergency procedures for a low-level radioactive waste disposal facility. It provides 25 procedures that are considered to be relatively independent of the characteristics of a disposal facility site, the facility design, and operations at the facility. These generic procedures should form a good starting point for final procedures on their subjects for the disposal facility. In addition, this document provides 55 annotated outlines of other procedures that are common to disposal facilities. The annotated outlines are meant as checklists to assist the developer of new procedures.

  6. 43 CFR 3275.12 - What environmental and safety requirements apply to facility operations?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false What environmental and safety requirements...) GEOTHERMAL RESOURCE LEASING Conducting Utilization Operations § 3275.12 What environmental and safety requirements apply to facility operations? (a) You must perform all utilization facility operations in a...

  7. 43 CFR 3275.12 - What environmental and safety requirements apply to facility operations?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false What environmental and safety requirements...) GEOTHERMAL RESOURCE LEASING Conducting Utilization Operations § 3275.12 What environmental and safety requirements apply to facility operations? (a) You must perform all utilization facility operations in a...

  8. 43 CFR 3275.12 - What environmental and safety requirements apply to facility operations?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false What environmental and safety requirements...) GEOTHERMAL RESOURCE LEASING Conducting Utilization Operations § 3275.12 What environmental and safety requirements apply to facility operations? (a) You must perform all utilization facility operations in a...

  9. 43 CFR 3275.12 - What environmental and safety requirements apply to facility operations?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false What environmental and safety requirements...) GEOTHERMAL RESOURCE LEASING Conducting Utilization Operations § 3275.12 What environmental and safety requirements apply to facility operations? (a) You must perform all utilization facility operations in a...

  10. Operator awareness of system status during Fast Flux Test Facility transition to standby

    SciTech Connect

    Gibson, J.L.

    1994-04-01

    A facility in transition, due to a change in its mission or its operating status, begins to depart from a previously well-defined normal mode of operation. The equipment becomes reconfigured or deactivated. In an environment of transition, the Fast Flux Test Facility (FFTF) has employed methods to enhance operator awareness of system status. These methods are described in this report.

  11. Quality assurance in the enriched uranium operations NDA facility

    SciTech Connect

    May, P.K.; Ceo, R.N.

    1997-11-01

    The Nondestructive Analysis (NDA) Facility at the Oak Ridge Y-12 Plant has characterized process wastes for Enriched Uranium Operations since 1978. Since that time, over 50,000 items have been analyzed. Analysis results are used to determine whether or not recovery of uranium from process wastes is economically feasible. Our instrument complement includes one large segmented gamma scanner (SGS), two smaller SGS, two solution assay systems (SAS), and Active Well Coincidence Counter (AWCC). The large SGS is used for analyzing High Efficiency Particulate Air (HEPA) filters ant 208-L drums filled with combustible contaminated waste. The smaller SGS are used to analyze 4-L containers of ash and leached residues. The SAS are used to analyze 125 ml bottles of aqueous or organic waste solutions that may contain uranium. The gamma-based NDA techniques are used to identify which process wastes can be discarded, and which must be recycled. The AWCC is used to analyze high-density materials which are not amenable to gamma-ray analysis. 1 ref., 4 figs.

  12. High Performance Computing Facility Operational Assessment 2015: Oak Ridge Leadership Computing Facility

    SciTech Connect

    Barker, Ashley D.; Bernholdt, David E.; Bland, Arthur S.; Gary, Jeff D.; Hack, James J.; McNally, Stephen T.; Rogers, James H.; Smith, Brian E.; Straatsma, T. P.; Sukumar, Sreenivas Rangan; Thach, Kevin G.; Tichenor, Suzy; Vazhkudai, Sudharshan S.; Wells, Jack C.

    2016-03-01

    Oak Ridge National Laboratory’s (ORNL’s) Leadership Computing Facility (OLCF) continues to surpass its operational target goals: supporting users; delivering fast, reliable systems; creating innovative solutions for high-performance computing (HPC) needs; and managing risks, safety, and security aspects associated with operating one of the most powerful computers in the world. The results can be seen in the cutting-edge science delivered by users and the praise from the research community. Calendar year (CY) 2015 was filled with outstanding operational results and accomplishments: a very high rating from users on overall satisfaction that ties the highest-ever mark set in CY 2014; the greatest number of core-hours delivered to research projects; the largest percentage of capability usage since the OLCF began tracking the metric in 2009; and success in delivering on the allocation of 60, 30, and 10% of core hours offered for the INCITE (Innovative and Novel Computational Impact on Theory and Experiment), ALCC (Advanced Scientific Computing Research Leadership Computing Challenge), and Director’s Discretionary programs, respectively. These accomplishments, coupled with the extremely high utilization rate, represent the fulfillment of the promise of Titan: maximum use by maximum-size simulations. The impact of all of these successes and more is reflected in the accomplishments of OLCF users, with publications this year in notable journals Nature, Nature Materials, Nature Chemistry, Nature Physics, Nature Climate Change, ACS Nano, Journal of the American Chemical Society, and Physical Review Letters, as well as many others. The achievements included in the 2015 OLCF Operational Assessment Report reflect first-ever or largest simulations in their communities; for example Titan enabled engineers in Los Angeles and the surrounding region to design and begin building improved critical infrastructure by enabling the highest-resolution Cybershake map for Southern

  13. Umatilla Hatchery Satellite Facilities; Operations and Maintenance, Annual Report 2001.

    SciTech Connect

    Rowan, Gerald

    2003-05-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem, Thornhollow and Pendleton satellite facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead and Three Mile Dam and South Fork Walla Walla facilities are used for holding and spawning chinook salmon. In some years, Three Mile Dam may also be used for holding and spawning coho salmon. In the spring of 2002, summer steelhead were acclimated and released at Bonifer Pond (54,917), Minthorn Springs (47,521), and Pendleton (54,366). Yearling coho (1,621,857) were also acclimated and released at Pendleton. Yearling spring chinook salmon (876,121) were acclimated and released at Imeques C-mem-ini-kem. At Thornhollow, 520,564 yearling fall chinook and 307,194 subyearling fall chinook were acclimated. In addition, 104,908 spring chinook were transported to Imeques C-mem-ini-kem in November for release in the spring of 2003. CTUIR and ODFW personnel monitored the progress of outmigration for juvenile releases at the Westland Canal juvenile facility. Nearly all juveniles released in the spring migrated downstream prior to the trap being opened in early July. A total of 100 unmarked and 10 marked summer steelhead were collected for broodstock at Three Mile Dam from September 21, 2001, through April 2, 2002. An estimated 180,955 green eggs were taken from 36 females and were transferred to Umatilla Hatchery for incubation and rearing. A total of 560 adult and 26 jack spring chinook salmon were collected for broodstock at Three Mile Dam from April 22 through June 12, 2002

  14. The Wallops Flight Facility Rapid Response Range Operations Initiative

    NASA Technical Reports Server (NTRS)

    Underwood, Bruce E.; Kremer, Steven E.

    2004-01-01

    While the dominant focus on short response missions has appropriately centered on the launch vehicle and spacecraft, often overlooked or afterthought phases of these missions have been launch site operations and the activities of launch range organizations. Throughout the history of organized spaceflight, launch ranges have been the bane of flight programs as the source of expense, schedule delays, and seemingly endless requirements. Launch Ranges provide three basic functions: (1) provide an appropriate geographical location to meet orbital other mission trajectory requirements, (2) provide project services such as processing facilities, launch complexes, tracking and data services, and expendable products, and (3) assure safety and property protection to participating personnel and third-parties. The challenge with which launch site authorities continuously struggle, is the inherent conflict arising from projects whose singular concern is execution of their mission, and the range s need to support numerous simultaneous customers. So, while tasks carried out by a launch range committed to a single mission pale in comparison to efforts of a launch vehicle or spacecraft provider and could normally be carried out in a matter of weeks, major launch sites have dozens of active projects separate sponsoring organizations. Accommodating the numerous tasks associated with each mission, when hardware failures, weather, maintenance requirements, and other factors constantly conspire against the range resource schedulers, make the launch range as significant an impediment to responsive missions as launch vehicles and their cargo. The obvious solution to the launch site challenge was implemented years ago when the Department of Defense simply established dedicated infrastructure and personnel to dedicated missions, namely an Inter Continental Ballistic Missile. This however proves to be prohibitively expensive for all but the most urgent of applications. So the challenge

  15. The Wallops Flight Facility Rapid Response Range Operations Initiative

    NASA Technical Reports Server (NTRS)

    Underwood, Bruce E.; Kremer, Steven E.

    2004-01-01

    While the dominant focus on short response missions has appropriately centered on the launch vehicle and spacecraft, often overlooked or afterthought phases of these missions have been launch site operations and the activities of launch range organizations. Throughout the history of organized spaceflight, launch ranges have been the bane of flight programs as the source of expense, schedule delays, and seemingly endless requirements. Launch Ranges provide three basic functions: (1) provide an appropriate geographical location to meet orbital other mission trajectory requirements, (2) provide project services such as processing facilities, launch complexes, tracking and data services, and expendable products, and (3) assure safety and property protection to participating personnel and third-parties. The challenge with which launch site authorities continuously struggle, is the inherent conflict arising from projects whose singular concern is execution of their mission, and the range s need to support numerous simultaneous customers. So, while tasks carried out by a launch range committed to a single mission pale in comparison to efforts of a launch vehicle or spacecraft provider and could normally be carried out in a matter of weeks, major launch sites have dozens of active projects separate sponsoring organizations. Accommodating the numerous tasks associated with each mission, when hardware failures, weather, maintenance requirements, and other factors constantly conspire against the range resource schedulers, make the launch range as significant an impediment to responsive missions as launch vehicles and their cargo. The obvious solution to the launch site challenge was implemented years ago when the Department of Defense simply established dedicated infrastructure and personnel to dedicated missions, namely an Inter Continental Ballistic Missile. This however proves to be prohibitively expensive for all but the most urgent of applications. So the challenge

  16. 43 CFR 3275.11 - What are a facility operator's obligations?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the facility in proper operating condition at all times by; (1) Conducting training during your... on sound engineering principles and other pertinent geologic and engineering data; (c) Prevent...

  17. High Performance Computing Facility Operational Assessment, FY 2011 Oak Ridge Leadership Computing Facility

    SciTech Connect

    Baker, Ann E; Bland, Arthur S Buddy; Hack, James J; Barker, Ashley D; Boudwin, Kathlyn J.; Kendall, Ricky A; Messer, Bronson; Rogers, James H; Shipman, Galen M; Wells, Jack C; White, Julia C

    2011-08-01

    Oak Ridge National Laboratory's Leadership Computing Facility (OLCF) continues to deliver the most powerful resources in the U.S. for open science. At 2.33 petaflops peak performance, the Cray XT Jaguar delivered more than 1.5 billion core hours in calendar year (CY) 2010 to researchers around the world for computational simulations relevant to national and energy security; advancing the frontiers of knowledge in physical sciences and areas of biological, medical, environmental, and computer sciences; and providing world-class research facilities for the nation's science enterprise. Scientific achievements by OLCF users range from collaboration with university experimentalists to produce a working supercapacitor that uses atom-thick sheets of carbon materials to finely determining the resolution requirements for simulations of coal gasifiers and their components, thus laying the foundation for development of commercial-scale gasifiers. OLCF users are pushing the boundaries with software applications sustaining more than one petaflop of performance in the quest to illuminate the fundamental nature of electronic devices. Other teams of researchers are working to resolve predictive capabilities of climate models, to refine and validate genome sequencing, and to explore the most fundamental materials in nature - quarks and gluons - and their unique properties. Details of these scientific endeavors - not possible without access to leadership-class computing resources - are detailed in Section 4 of this report and in the INCITE in Review. Effective operations of the OLCF play a key role in the scientific missions and accomplishments of its users. This Operational Assessment Report (OAR) will delineate the policies, procedures, and innovations implemented by the OLCF to continue delivering a petaflop-scale resource for cutting-edge research. The 2010 operational assessment of the OLCF yielded recommendations that have been addressed (Reference Section 1) and where

  18. Twenty questions for tanning facility operators: a survey of operator knowledge.

    PubMed

    Ross, R N; Phillips, B

    1994-01-01

    A two-page questionnaire was administered to 37 tanning operators in five municipalities in BC's lower mainland. The results were analyzed to determine the knowledge base of the participants as it related to ultraviolet radiation (UVR), tanning equipment, biological effects of exposure and the advice given to clients. Only 19% of the participants scored high enough to meet Alberta's criteria for adequate knowledge to operate a tanning facility. Participants seemed knowledgeable about skin type, premature skin aging effects, skin cancer, cataracts and skin and eye irritation. The greatest knowledge deficiencies identified were 1) the definition of UVA and UVB; 2) the biological role of UVA and UVB as it relates to tanning; 3) the degree to which UVA and UVB is emitted by sunbeds; and 4) knowledge of common drugs and medications that cause photosensitivity. Follow-up activity is briefly described.

  19. 42 CFR 412.405 - Preadmission services as inpatient operating costs under the inpatient psychiatric facility...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... under the inpatient psychiatric facility prospective payment system. 412.405 Section 412.405 Public... Services of Inpatient Psychiatric Facilities § 412.405 Preadmission services as inpatient operating costs under the inpatient psychiatric facility prospective payment system. The prospective payment system...

  20. 42 CFR 412.405 - Preadmission services as inpatient operating costs under the inpatient psychiatric facility...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... under the inpatient psychiatric facility prospective payment system. 412.405 Section 412.405 Public... Services of Inpatient Psychiatric Facilities § 412.405 Preadmission services as inpatient operating costs under the inpatient psychiatric facility prospective payment system. The prospective payment...

  1. 42 CFR 412.405 - Preadmission services as inpatient operating costs under the inpatient psychiatric facility...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... under the inpatient psychiatric facility prospective payment system. 412.405 Section 412.405 Public... Services of Inpatient Psychiatric Facilities § 412.405 Preadmission services as inpatient operating costs under the inpatient psychiatric facility prospective payment system. The prospective payment...

  2. 42 CFR 412.405 - Preadmission services as inpatient operating costs under the inpatient psychiatric facility...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... under the inpatient psychiatric facility prospective payment system. 412.405 Section 412.405 Public... Services of Inpatient Psychiatric Facilities § 412.405 Preadmission services as inpatient operating costs under the inpatient psychiatric facility prospective payment system. The prospective payment...

  3. 42 CFR 412.405 - Preadmission services as inpatient operating costs under the inpatient psychiatric facility...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... under the inpatient psychiatric facility prospective payment system. 412.405 Section 412.405 Public... Services of Inpatient Psychiatric Facilities § 412.405 Preadmission services as inpatient operating costs under the inpatient psychiatric facility prospective payment system. The prospective payment...

  4. Facility Operations 1993 fiscal year work plan: WBS 1.3.1

    SciTech Connect

    Not Available

    1992-11-01

    The Facility Operations program is responsible for the safe, secure, and environmentally sound management of several former defense nuclear production facilities, and for the nuclear materials in those facilities. As the mission for Facility Operations plants has shifted from production to support of environmental restoration, each plant is making a transition to support the new mission. The facilities include: K Basins (N Reactor fuel storage); N Reactor; Plutonium-Uranium Reduction Extraction (PUREX) Plant; Uranium Oxide (UO{sub 3}) Plant; 300 Area Fuels Supply (N Reactor fuel supply); Plutonium Finishing Plant (PFP).

  5. Union Pacific Railroad`s LNG locomotive test program

    SciTech Connect

    Grimaila, B.

    1995-12-31

    Union Pacific Railroad is testing LNG in six locomotives through 1997 to determine if the liquefied natural gas technology is right for them. Two of the six LNG test locomotives are switch, or yard, locomotives. These 1,350 horsepower locomotives are the industry`s first locomotives totally fueled by natural gas. They`re being tested in the yard in the Los Angeles area. The other four locomotives are long-haul locomotives fueled by two tenders. These units are duel-fueled, operating on a mixture of LNG and diesel and are being tested primarily on the Los Angeles to North Platte, Nebraska corridor. All the information concerning locomotive emissions, locomotive performance, maintenance requirements, the overall LNG system design and the economic feasibility of the project will be analyzed to determine if UPR should expand, or abandon, the LNG technology.

  6. 78 FR 40519 - Cooper Nuclear Station; Application and Amendment to Facility Operating License Involving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-05

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Cooper Nuclear Station; Application and Amendment to Facility Operating License Involving Proposed... No. DPR-46, issued to Nebraska Public Power District (the licensee), for operation of the...

  7. Students Speak With Angela Bauer, Facilities Operations and Maintenance Group Lead

    NASA Image and Video Library

    From NASA’s International Space Station Mission Control Center Angela Bauer, Facilities Operations and Maintenance Group lead in the Mission Operations Directorate at Johnson Space Center, partic...

  8. 75 FR 52557 - Entergy Nuclear Operations, Inc.; Notice of Withdrawal of Application for Amendment to Facility...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ... COMMISSION Entergy Nuclear Operations, Inc.; Notice of Withdrawal of Application for Amendment to Facility... proposed amendment to Facility Operating License Nos. DPR-26 and DPR-64 for the Indian Point Nuclear Generating Unit Nos. 2 and 3, located in Westchester County, New York. The proposed amendment would...

  9. 9 CFR 354.210 - Minimum standards for sanitation, facilities, and operating procedures in official plants.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 2 2013-01-01 2013-01-01 false Minimum standards for sanitation, facilities, and operating procedures in official plants. 354.210 Section 354.210 Animals and Animal Products... sanitation, facilities, and operating procedures in official plants. The provisions of §§ 354.210 to...

  10. 9 CFR 354.210 - Minimum standards for sanitation, facilities, and operating procedures in official plants.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Minimum standards for sanitation, facilities, and operating procedures in official plants. 354.210 Section 354.210 Animals and Animal Products... sanitation, facilities, and operating procedures in official plants. The provisions of §§ 354.210 to...

  11. 9 CFR 354.210 - Minimum standards for sanitation, facilities, and operating procedures in official plants.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Minimum standards for sanitation, facilities, and operating procedures in official plants. 354.210 Section 354.210 Animals and Animal Products... sanitation, facilities, and operating procedures in official plants. The provisions of §§ 354.210 to...

  12. 9 CFR 354.210 - Minimum standards for sanitation, facilities, and operating procedures in official plants.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Minimum standards for sanitation, facilities, and operating procedures in official plants. 354.210 Section 354.210 Animals and Animal Products... sanitation, facilities, and operating procedures in official plants. The provisions of §§ 354.210 to...

  13. 9 CFR 354.210 - Minimum standards for sanitation, facilities, and operating procedures in official plants.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Minimum standards for sanitation, facilities, and operating procedures in official plants. 354.210 Section 354.210 Animals and Animal Products... sanitation, facilities, and operating procedures in official plants. The provisions of §§ 354.210 to...

  14. 78 FR 17763 - Housatonic Railroad Company, Inc., Maybrook Railroad Company, and Housatonic Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... Surface Transportation Board Housatonic Railroad Company, Inc., Maybrook Railroad Company, and Housatonic Transportation Company--Intra-Corporate Family Transaction Exemption Housatonic Railroad Company, Inc. (HRRC), Maybrook Railroad Company (MRC), and Housatonic Transportation Company (HTC) (collectively,...

  15. Lunar Transportation Facilities and Operations Study, option 1

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Throughout the Option I period of the Lunar Transportation Facilities and Operations Study (LTFOS), McDonnell Douglas Space Systems Company - Kennedy Space Center (MDSSC-KSC) provided support to both the Planetary Surface Systems (PSS) Office at the National Aeronautics and Space Administration (NASA) at the Johnson Space Center and to the Flight and Ground Systems Projects Office (Payload Projects Management) at the Kennedy Space Center. The primary objective of the Option I phase of the study was to assist the above NASA centers in developing Space Exploration Initiative (SEI) concepts. MDSSC-KSC conducted three analyses which provided launch and landing detail to the proposed exploration concepts. One analysis, the Lunar Ejecta Assessment, was conducted to determine the effects of launch and landing a vehicle in a dusty environment. A second analysis, the Thermal/Micrometeoroid Protection Trade Study, was refined to determine the impacts that Reference Architecture Option 5A would have on thermal/micrometeoroid protection approaches. The third analysis, the Centaur Prelaunch Procedure Analysis, used a Centaur prelaunch test and checkout flow to identify key considerations that would be important if a Lunar Excursion Vehicle (LEV) was to use an expander cycle liquid oxygen-liquid hydrogen engine. Several 'quick look' assessments were also conducted. One quick look assessment, the Storable Propellant Quick Look Assessment, was conducted to identify design considerations that should be made if storable propellants were to be used instead of liquid oxygen and liquid hydrogen. The LEV Servicer Maintenance Analysis provided an early look at the effort required to maintain an LEV Servicer on the lunar surface. Also, support was provided to the PSS Logistics Manager to develop initial LEV Servicer cost inputs. Consideration was given to the advanced development that must be provided to accomplish a lunar and/or Mars mission. MDSS-KSC also provided support to both MASE

  16. Lunar Transportation Facilities and Operations Study, option 1

    NASA Astrophysics Data System (ADS)

    1991-05-01

    Throughout the Option I period of the Lunar Transportation Facilities and Operations Study (LTFOS), McDonnell Douglas Space Systems Company - Kennedy Space Center (MDSSC-KSC) provided support to both the Planetary Surface Systems (PSS) Office at the National Aeronautics and Space Administration (NASA) at the Johnson Space Center and to the Flight and Ground Systems Projects Office (Payload Projects Management) at the Kennedy Space Center. The primary objective of the Option I phase of the study was to assist the above NASA centers in developing Space Exploration Initiative (SEI) concepts. MDSSC-KSC conducted three analyses which provided launch and landing detail to the proposed exploration concepts. One analysis, the Lunar Ejecta Assessment, was conducted to determine the effects of launch and landing a vehicle in a dusty environment. A second analysis, the Thermal/Micrometeoroid Protection Trade Study, was refined to determine the impacts that Reference Architecture Option 5A would have on thermal/micrometeoroid protection approaches. The third analysis, the Centaur Prelaunch Procedure Analysis, used a Centaur prelaunch test and checkout flow to identify key considerations that would be important if a Lunar Excursion Vehicle (LEV) was to use an expander cycle liquid oxygen-liquid hydrogen engine. Several 'quick look' assessments were also conducted. One quick look assessment, the Storable Propellant Quick Look Assessment, was conducted to identify design considerations that should be made if storable propellants were to be used instead of liquid oxygen and liquid hydrogen. The LEV Servicer Maintenance Analysis provided an early look at the effort required to maintain an LEV Servicer on the lunar surface. Also, support was provided to the PSS Logistics Manager to develop initial LEV Servicer cost inputs. Consideration was given to the advanced development that must be provided to accomplish a lunar and/or Mars mission. MDSS-KSC also provided support to both MASE

  17. High Performance Computing Facility Operational Assessment, FY 2010 Oak Ridge Leadership Computing Facility

    SciTech Connect

    Bland, Arthur S Buddy; Hack, James J; Baker, Ann E; Barker, Ashley D; Boudwin, Kathlyn J.; Kendall, Ricky A; Messer, Bronson; Rogers, James H; Shipman, Galen M; White, Julia C

    2010-08-01

    Oak Ridge National Laboratory's (ORNL's) Cray XT5 supercomputer, Jaguar, kicked off the era of petascale scientific computing in 2008 with applications that sustained more than a thousand trillion floating point calculations per second - or 1 petaflop. Jaguar continues to grow even more powerful as it helps researchers broaden the boundaries of knowledge in virtually every domain of computational science, including weather and climate, nuclear energy, geosciences, combustion, bioenergy, fusion, and materials science. Their insights promise to broaden our knowledge in areas that are vitally important to the Department of Energy (DOE) and the nation as a whole, particularly energy assurance and climate change. The science of the 21st century, however, will demand further revolutions in computing, supercomputers capable of a million trillion calculations a second - 1 exaflop - and beyond. These systems will allow investigators to continue attacking global challenges through modeling and simulation and to unravel longstanding scientific questions. Creating such systems will also require new approaches to daunting challenges. High-performance systems of the future will need to be codesigned for scientific and engineering applications with best-in-class communications networks and data-management infrastructures and teams of skilled researchers able to take full advantage of these new resources. The Oak Ridge Leadership Computing Facility (OLCF) provides the nation's most powerful open resource for capability computing, with a sustainable path that will maintain and extend national leadership for DOE's Office of Science (SC). The OLCF has engaged a world-class team to support petascale science and to take a dramatic step forward, fielding new capabilities for high-end science. This report highlights the successful delivery and operation of a petascale system and shows how the OLCF fosters application development teams, developing cutting-edge tools and resources for next

  18. 34 CFR 395.30 - The location and operation of vending facilities for blind vendors on Federal property.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false The location and operation of vending facilities for... § 395.30 The location and operation of vending facilities for blind vendors on Federal property. (a... facilities on any Federal property. (b) Any limitation on the location or operation of a vending facility for...

  19. Battery test facility hardware, software, and system operation

    SciTech Connect

    Rodriguez, G.P.

    1991-09-01

    Division 2525 Battery Test Laboratory is a fully automated battery testing facility used in evaluating various battery technologies. The results of these tests are used to verify developers` claims, characterize prototypes, and assist in identifying the strengths and weaknesses of each technology. The Test Facility consists of a central computer and nine remote computer controlled battery test systems. Data acquired during the battery testing process is sent to the central computer system. The test data is then stored in a large database for future analysis. The central computer system is also used in configuring battery tests. These test configurations are then sent to their appropriate remote battery test sites. The Battery Test Facility can perform a variety of battery tests, which include the following: Life Cycle Testing; Parametric Testing at various temperature levels, cutoff parameters, charge rates, and discharge rates; Constant Power Testing at various power levels; Peak Power Testing at various State-of-Charge levels; Simplified Federal Urban Driving Schedule Tests (SFUDS79). The Battery Test Facility is capable of charging a battery either by constant current, constant voltage, step current levels, or any combination of them. Discharge cycles can be by constant current, constant resistance, constant power, step current levels, or also any combination of them. The Battery Test Facility has been configured to provide the flexibility to evaluate a large variety of battery technologies. These technologies include Lead-Acid, Sodium/Sulfur, Zinc/Bromine, Nickel/Hydrogen, Aluminum/Air, and Nickel/Cadmium batteries.

  20. Battery test facility hardware, software, and system operation

    SciTech Connect

    Rodriguez, G.P.

    1991-09-01

    Division 2525 Battery Test Laboratory is a fully automated battery testing facility used in evaluating various battery technologies. The results of these tests are used to verify developers' claims, characterize prototypes, and assist in identifying the strengths and weaknesses of each technology. The Test Facility consists of a central computer and nine remote computer controlled battery test systems. Data acquired during the battery testing process is sent to the central computer system. The test data is then stored in a large database for future analysis. The central computer system is also used in configuring battery tests. These test configurations are then sent to their appropriate remote battery test sites. The Battery Test Facility can perform a variety of battery tests, which include the following: Life Cycle Testing; Parametric Testing at various temperature levels, cutoff parameters, charge rates, and discharge rates; Constant Power Testing at various power levels; Peak Power Testing at various State-of-Charge levels; Simplified Federal Urban Driving Schedule Tests (SFUDS79). The Battery Test Facility is capable of charging a battery either by constant current, constant voltage, step current levels, or any combination of them. Discharge cycles can be by constant current, constant resistance, constant power, step current levels, or also any combination of them. The Battery Test Facility has been configured to provide the flexibility to evaluate a large variety of battery technologies. These technologies include Lead-Acid, Sodium/Sulfur, Zinc/Bromine, Nickel/Hydrogen, Aluminum/Air, and Nickel/Cadmium batteries.

  1. 14 CFR 121.99 - Communications facilities-domestic and flag operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Communications facilities-domestic and flag... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Approval of Routes: Domestic and Flag Operations § 121.99 Communications facilities—domestic and flag operations. (a) Each certificate...

  2. 14 CFR 121.99 - Communications facilities-domestic and flag operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Communications facilities-domestic and flag... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Approval of Routes: Domestic and Flag Operations § 121.99 Communications facilities—domestic and flag operations. (a) Each certificate...

  3. The Trainset Railroad Simulation

    DTIC Science & Technology

    1993-02-13

    Schneider, Editors, Jacob Aizikowitz, Thomas Bressoud , Tony Lek 13a. TYPE OF REPORT 13b. TIME COVERED 14 DATE OF REPORT (Year. Month. Day) 15 PAGE...Editor)* Fred B. Schneider (Editor) Jacob Aizikowitz** Thomas C. Bressoud Tony Lekas*** TR 93-1329 February 1993 UNTIS c’’A&I C1 tb ~ric [,~b 18y ib...Railroad Simiulat*iori Richard A. Browni and Fred B. Schneider, Editors .Jacob Aizikowitz 2 Thomas C. Bressoud Toriv Lekas’i The RR Project Department of

  4. The operation of the Tokamak Fusion Test Reactor Tritium Facility

    SciTech Connect

    Gentile, C.A.; LaMarche, P.H.; Anderson, J.L.

    1995-07-01

    The TFTR tritium operations staff has successfully received, stored, handled, and processed over five hundred thousand curies of tritium for the purpose of supporting D-T (Deuterium-Tritium) operations at TFTR. Tritium operations personnel nominally provide continuous round the clock coverage (24 hours/day, 7 days/week) in shift complements consisting of I supervisor and 3 operators. Tritium Shift Supervisors and operators are required to have 5 years of operational experience in either the nuclear or chemical industry and to become certified for their positions. The certification program provides formal instruction, as well as on the job training. The certification process requires 4 to 6 months to complete, which includes an oral board lasting up to 4 hours at which time the candidate is tested on their knowledge of Tritium Technology and TFTR Tritium systems. Once an operator is certified, the training process continues with scheduled training weeks occurring once every 5 weeks. During D-T operations at TFTR the operators must evacuate the tritium area due to direct radiation from TFTR D-T pulses. During `` time operators maintain cognizance over tritium systems via a real time TV camera system. Operators are able to gain access to the Tritium area between TFTR D-T pulses, but have been excluded from die tritium area during D-T pulsing for periods up to 30 minutes. Tritium operators are responsible for delivering tritium gas to TFRR as well as processing plasma exhaust gases which lead to the deposition of tritium oxide on disposable molecular sieve beds (DMSB). Once a DMSB is loaded, the operations staff remove the expended DMSB, and replace it with a new DMSB container. The TFIR tritium system is operated via detailed procedures which require operator sign off for system manipulation. There are >300 procedures controlling the operation of the tritium systems.

  5. Lewis Wooten in the MSFC Payload Operations Integration facility.

    NASA Image and Video Library

    2015-04-13

    LEWIS WOOTEN, NEW DIRECTOR OF THE MISSION OPERATIONS LABORATORY AT NASA'S MARSHALL SPACE FLIGHT CENTER IN HUNTSVILLE, ALABAMA, MANAGES OPERATIONS IN THE PAYLOAD OPERATIONS INTEGRATION CENTER-THE COMMAND POST FOR ALL SCIENCE AND RESEARCH ACTIVITIES ON THE INTERNATIONAL SPACE STATION

  6. Railroad management planning. (Latest citations from the NTIS database). Published Search

    SciTech Connect

    Not Available

    1993-01-01

    The bibliography contains citations concerning railroad management techniques and their impact on operations. Topics include freight statistics, impacts on communities, and yard operations. Forecasts of future trends and government policies regarding railroad operations are also discussed. (Contains a minimum of 76 citations and includes a subject term index and title list.)

  7. Exploring Operational Safeguards, Safety, and Security by Design to Address Real Time Threats in Nuclear Facilities

    SciTech Connect

    Schanfein, Mark J.; Mladineo, Stephen V.

    2015-07-07

    Over the last few years, significant attention has been paid to both encourage application and provide domestic and international guidance for designing in safeguards and security in new facilities.1,2,3 However, once a facility is operational, safeguards, security, and safety often operate as separate entities that support facility operations. This separation is potentially a serious weakness should insider or outsider threats become a reality.Situations may arise where safeguards detects a possible loss of material in a facility. Will they notify security so they can, for example, check perimeter doors for tampering? Not doing so might give the advantage to an insider who has already, or is about to, move nuclear material outside the facility building. If outsiders break into a facility, the availability of any information to coordinate the facility’s response through segregated alarm stations or a failure to include all available radiation sensors, such as safety’s criticality monitors can give the advantage to the adversary who might know to disable camera systems, but would most likely be unaware of other highly relevant sensors in a nuclear facility.This paper will briefly explore operational safeguards, safety, and security by design (3S) at a high level for domestic and State facilities, identify possible weaknesses, and propose future administrative and technical methods, to strengthen the facility system’s response to threats.

  8. Overview of the DOE Waste Facilities Operations Robotics Technology Development Program

    SciTech Connect

    Ward, C.R.

    1992-01-01

    The Department of Energy's Office of Technology Development has initiated a Robotics Technology Development Program that includes technology aimed at DOE Waste Facilities Operations (WFO). Much of this technology may also be applicable to waste facilities outside of DOE and will be available for use. This is a team effort of several DOE Laboratories and Sites. The WFO team includes the Savannah River Technology Center, Sandia National Laboratories, Oak Ridge National Laboratory, Idaho National Engineering Laboratory, Lawrence Livermore National Laboratory, the Fernald Environmental Management Project and the Waste Isolation Pilot Plant. DOE has waste facilities currently in operation at many sites and many more of these facilities are planned as part of the DOE site cleanup effort. As the cleanup continues, existing facilities and new facilities will be taxed with an increasing volume of waste, more varied waste streams, more complex processing requirements, more challenging waste characteristics, more stringent waste form criteria, and stricter regulations. The WFO Robotics Technology Development Program will address these challenges by developing robotic systems technology that will be safer, better, faster, and cheaper than existing technology. The goals of this technology development are to remove humans from both radiologically and physically dangerous environments in waste facilities, improve the quality and quality assurance of operations, increase the throughput of operations, increase the flexibility of facilities, reduce the manpower requirements for operations and meet federal, state and local regulations. There are four areas within the WFO program; the Mixed Waste Treatment Project, Stored Waste, the Waste Isolation Pilot Plant and Remote Size Reduction.

  9. 78 FR 12824 - Notice of Application for Approval of Discontinuance or Modification of a Railroad Signal System...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-25

    ... Federal Railroad Administration Notice of Application for Approval of Discontinuance or Modification of a Railroad Signal System or Relief From Requirements In accordance with Part 235 of Title 49 Code of Federal... January 21, 2013, the Grand Trunk Western Railroad Company (GTW), which operates under the trade name...

  10. 76 FR 13272 - Columbia & Cowlitz Railway, LLC-Corporate Family Transaction Exemption-Patriot Woods Railroad, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-10

    ... Surface Transportation Board Columbia & Cowlitz Railway, LLC--Corporate Family Transaction Exemption--Patriot Woods Railroad, LLC Columbia & Cowlitz Railway, LLC (CLC) and Patriot Woods Railroad, LLC (Woods... corporate family. CLC seeks to lease and operate all of Woods' lines of railroad consisting of approximately...

  11. 76 FR 56873 - American Railroad Group Transportation Services, LLC d/b/a ARG Trans-Continuance in Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-14

    ... Surface Transportation Board American Railroad Group Transportation Services, LLC d/b/a ARG Trans--Continuance in Control Exemption--Coos Bay Railroad Operating Company, LLC d/b/a Coos Bay Rail Link American Railroad Group Transportation Services, LLC d/b/a ARG Trans (ARG Trans), a noncarrier, has filed a verified...

  12. Operator-machine interface at a large laser-fusion facility

    SciTech Connect

    Sutton, J.G.; Howell, J.A.

    1982-01-01

    The operator-machine interface at the Antares Laser Facility provides the operator with a means of controlling the laser system and obtaining operational and performance information. The goal of this interface is to provide an operator with access to the control system in a comfortable way, and to facilitate meeting operational requirements. We describe the philosophy and requirements behind this interface, the hardware used in building it, and the software environment.

  13. Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant

    SciTech Connect

    Norm Stanley

    2011-02-01

    This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

  14. Operating manual for the High Flux Isotope Reactor. Volume I. Description of the facility

    SciTech Connect

    Not Available

    1982-09-01

    This volume contains a comprehensive description of the High Flux Isotope Reactor Facility. Its primary purpose is to supplement the detailed operating procedures, providing the reactor operators with background information on the various HFIR systems. The detailed operating procdures are presented in another report.

  15. Higher Education Facilities Commissions: A Self-Study of Operational Patterns and State Plan Criteria.

    ERIC Educational Resources Information Center

    National Association of Executive Directors of Higher Education Facilities Commissions. Committee on Administration and State Plans.

    This document investigates operational patterns and state plan criteria of the Higher Education Facilities Commission. Four study procedures were delineated: (1) development of a list of common responsibilities inherent for state facilities commissions in related federal legislation, (2) development of a calendar of important date related to the…

  16. 14 CFR 121.609 - Communication and navigation facilities: Supplemental operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Communication and navigation facilities... Flight Release Rules § 121.609 Communication and navigation facilities: Supplemental operations. No person may release an aircraft over any route or route segment unless communication and navigation...

  17. 14 CFR 121.609 - Communication and navigation facilities: Supplemental operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Communication and navigation facilities... Flight Release Rules § 121.609 Communication and navigation facilities: Supplemental operations. No person may release an aircraft over any route or route segment unless communication and navigation...

  18. 14 CFR 121.609 - Communication and navigation facilities: Supplemental operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Communication and navigation facilities... Flight Release Rules § 121.609 Communication and navigation facilities: Supplemental operations. No person may release an aircraft over any route or route segment unless communication and navigation...

  19. 14 CFR 121.609 - Communication and navigation facilities: Supplemental operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Communication and navigation facilities... Flight Release Rules § 121.609 Communication and navigation facilities: Supplemental operations. No person may release an aircraft over any route or route segment unless communication and navigation...

  20. 14 CFR 121.609 - Communication and navigation facilities: Supplemental operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Communication and navigation facilities... Flight Release Rules § 121.609 Communication and navigation facilities: Supplemental operations. No person may release an aircraft over any route or route segment unless communication and navigation...

  1. 75 FR 68831 - Notice; Applications and Amendments to Facility Operating Licenses Involving Proposed No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-09

    ...-safeguards information (SUNSI). The amendments would approve the proposed Cyber Security Plan and... Commission-approved Cyber Security Plan as required by 10 CFR 73.54. Basis for proposed no significant... Facility Operating License (FOL) to implement and maintain a Cyber Security Plan as part of the facility's...

  2. Railroad Valley, Nevada

    NASA Image and Video Library

    2002-02-01

    Information from images of Railroad Valley, Nevada captured on August 17, 2001 by the Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) may provide a powerful tool for monitoring crop health and maintenance procedures. These images cover an area of north central Nevada. The top image shows irrigated fields, with healthy vegetation in red. The middle image highlights the amount of vegetation. The color code shows highest vegetation content in red, orange, yellow, green, blue, and purple and the lowest in black. The final image is a thermal infrared channel, with warmer temperatures in white and colder in black. In the thermal image, the northernmost and westernmost fields are markedly colder on their northwest areas, even though no differences are seen in the visible image or the second, Vegetation Index image. This can be attributed to the presence of excess water, which can lead to crop damage. http://photojournal.jpl.nasa.gov/catalog/PIA03463

  3. Heliostat operation at the central receiver test facility (1978 - 1980)

    NASA Astrophysics Data System (ADS)

    Holmes, J. T.

    1981-07-01

    The CRTP beam produces a total power of 5.5 MWth and a peak intensity of 2250 kW/sq m near solar noon. A safe operating strategy was implemented. Improvements in the targeting accuracy were made. The mirror reflectivity is maintained near 80% by cleaning with natural rains or snow. The CRTF heliostats logged almost 300,000 operating hours by the end of 1980.

  4. 78 FR 66987 - Railroad Safety Technology Program Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-07

    ... Federal Railroad Administration Railroad Safety Technology Program Grant Program AGENCY: Federal Railroad... applications. SUMMARY: The Railroad Safety Technology Grant Program was first authorized under the Rail Safety... . SUPPLEMENTARY INFORMATION: Authority and Funding: The Railroad Safety Technology Grant Program, authorized under...

  5. 75 FR 20038 - Railroad Safety Technology Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Federal Railroad Administration Railroad Safety Technology Grant Program AGENCY: Federal Railroad Administration, Department of Transportation. ACTION: Notice of Funds Availability, Railroad Safety Technology... (Volume 75, Number 59; March 29, 2010) for the Railroad Safety Technology Program, in the section...

  6. 78 FR 26423 - Railroad Safety Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... Advisory Committee that develops railroad safety regulations through a consensus process. The RSAC meeting... Federal Railroad Administration Railroad Safety Advisory Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of Railroad...

  7. 75 FR 73158 - Railroad Safety Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... advisory committee that develops railroad safety regulations through a consensus process. The RSAC meeting... Federal Railroad Administration Railroad Safety Advisory Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of Railroad...

  8. 77 FR 52393 - Railroad Safety Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-29

    ... Federal Railroad Administration Railroad Safety Advisory Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of Railroad Safety... Advisory Committee that develops railroad safety regulations through a consensus process. The RSAC...

  9. 76 FR 41555 - Tupelo, Mississippi Railroad Relocation Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-14

    ... Federal Railroad Administration Tupelo, Mississippi Railroad Relocation Project AGENCY: Federal Railroad... Environmental Impact Statement and public hearing for the Tupelo, Mississippi Railroad Relocation Project (Project). SUMMARY: The Federal Railroad Administration announces the availability of the...

  10. 78 FR 62002 - Railroad Safety Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-10

    ... Federal Railroad Administration Railroad Safety Advisory Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of Railroad Safety... Advisory Committee that develops railroad safety regulations through a consensus process. The RSAC...

  11. Space ultra-vacuum facility and method of operation

    NASA Technical Reports Server (NTRS)

    Naumann, Robert J. (Inventor)

    1986-01-01

    A wake shield facility providing an ultrahigh vacuum level for space processing is described. The facility is in the shape of a truncated, hollow hemispherical section, one side of the shield convex and the other concave. The shield surface is preferably made of material that has low out-gassing characteristics such as stainless steel. A material sample supporting fixture in the form of a carousel is disposed on the convex side of the shield at its apex. Movable arms, also on the convex side, are connected by the shield in proximity to the carousel, the arms supporting processing fixtures, and providing for movement of the fixtures to predetermined locations required for producing interations with material samples. For MBE processes a vapor jet projects a stream of vaporized material onto a sample surface. The fixtures are oriented to face the surface of the sample being processed when in their extended position, and when not in use they are retractable to a storage position. The concave side of the shield has a support structure including metal struts connected to the shield, extending radially inward. The struts are joined to an end plate disposed parallel to the outer edge of the shield. This system eliminates outgassing contamination.

  12. Spent Nuclear Fuel (SNF) Project Cold Vacuum Drying (CVD) Facility Operations Manual

    SciTech Connect

    IRWIN, J.J.

    2000-02-03

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of the Processing Systems (Garvin 1998) and, the HNF-SD-SNF-DRD-002, 1997, Cold Vacuum Drying Facility Design Requirements, Rev. 3a. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence, and has been developed for the spent nuclear fuel project (SNFP) Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

  13. Spent Nuclear Fuel (SNF) Cold Vacuum Drying (CVD) Facility Operations Manual

    SciTech Connect

    IRWIN, J.J.

    1999-07-02

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-553, Spent Nuclear Fuel Project Final Safety Analysis Report Annex B--Cold Vacuum Drying Facility. The HNF-SD-SNF-DRD-002, 1999, Cold Vacuum Drying Facility Design Requirements, Rev. 4, and the CVDF Final Design Report. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence and references to the CVDF System Design Descriptions (SDDs). This manual has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

  14. EPA Advises Facility Operators to Minimize Releases during Hazardous Weather Events

    EPA Pesticide Factsheets

    ATLANTA - As hurricane season approaches, U.S. Environmental Protection Agency (EPA) is issuing a Hazardous Weather Release Prevention and Reporting alert to remind facility operators of certain regulations that require minimization of chemical rele

  15. 41 CFR 101-5.105 - Operation of the centralized facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 5-CENTRALIZED SERVICES IN FEDERAL BUILDINGS AND COMPLEXES 5.1-General § 101-5.105 Operation of the centralized facility. (a) GSA...

  16. 41 CFR 101-5.105 - Operation of the centralized facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 5-CENTRALIZED SERVICES IN FEDERAL BUILDINGS AND COMPLEXES 5.1-General § 101-5.105 Operation of the centralized facility. (a) GSA...

  17. 41 CFR 101-5.105 - Operation of the centralized facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 5-CENTRALIZED SERVICES IN FEDERAL BUILDINGS AND COMPLEXES 5.1-General § 101-5.105 Operation of the centralized facility. (a) GSA...

  18. 41 CFR 101-5.105 - Operation of the centralized facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 5-CENTRALIZED SERVICES IN FEDERAL BUILDINGS AND COMPLEXES 5.1-General § 101-5.105 Operation of the centralized facility. (a) GSA...

  19. Fact Sheet: Control Techniques Guidelines (CTG) for Shipbuilding and Ship Repair Facilities Operation (Surface Coating)

    EPA Pesticide Factsheets

    This page contains an August 1996 fact sheet with information regarding the CTG and Alternative Control Techniques (ACT) for Surface Coating at Shipbuilding and Ship Repair Facilities Operations. This document provides a summary of this guidance

  20. 75 FR 19431 - Union Electric Company; Notice of Consideration of Issuance of Amendment to Facility Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-14

    ... COMMISSION Union Electric Company; Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing The U... amendment request involves no significant hazards consideration. Under the Commission's ] regulations in...

  1. 75 FR 27825 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations I. Background... determination by the Commission that such amendment involves no significant hazards consideration.... The last biweekly notice was published on May 4, 2010 (75 FR 23808). Notice of Consideration...

  2. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... powered industrial trucks are used to open railcar doors, the trucks or the railcar doors shall be... being opened and closed. (j) Only railcar door openers or powered industrial trucks equipped with door... or flat cars when drafts that create overhead, caught-in, caught-between or struck-by hazards...

  3. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... powered industrial trucks are used to open railcar doors, the trucks or the railcar doors shall be... being opened and closed. (j) Only railcar door openers or powered industrial trucks equipped with door... or flat cars when drafts that create overhead, caught-in, caught-between or struck-by hazards...

  4. Facility Safety Plan B360 Complex Biohazardous Operations CMLS-412r0

    SciTech Connect

    Cooper, G

    2007-01-08

    This Addendum to the Facility Safety Plan (FSP) 360 Complex describes the safety requirements for the safe conduct of all biohazardous research operations in all buildings within the 360 complex program areas. These requirements include all the responsibilities and authorities of building personnel, operational hazards, and environmental concerns and their controls. In addition, this Addendum prescribes facility-specific training requirements and emergency controls, as well as maintenance and quality assurance requirements for ES&H-related building systems.

  5. Microbiology operations and facilities aboard restructured Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Cioletti, Louis A.; Mishra, S. K.; Pierson, Duane L.

    1992-01-01

    With the restructure and funding changes for Space Station Freedom, the Environmental Health System (EHS)/Microbiology Subsystem revised its scheduling and operational requirements for component hardware. The function of the Microbiology Subsystem is to monitor the environmental quality of air, water, and internal surfaces and, in part, crew health on board Space Station. Its critical role shall be the identification of microbial contaminants in the environment that may cause system degradation, produce unsanitary or pathogenic conditions, or reduce crew and mission effectiveness. EHS/Microbiology operations and equipment shall be introduced in concert with a phased assembly sequence, from Man Tended Capability (MTC) through Permanently Manned Capability (PMC). Effective Microbiology operations and subsystem components will assure a safe, habitable, and useful spacecraft environment for life sciences research and long-term manned exploration.

  6. Operational experience from a large EPICS-based accelerator facility

    SciTech Connect

    Ciarlette, D.J.; Gerig, R.

    1995-12-31

    The Advanced Photon Source (APS) at Argonne National Laboratory is a third-generation x-ray light source which uses the Experimental Physics and Industrial Control System (EPICS) to operate its linear accelerator, positron accumulator ring, booster synchrotron, and storage ring equipment. EPICS has been used at the APS since the beginning of installation and commissioning. Currently, EPICS controls approximately 100 VME crates containing over 100,000 process variables. With this complexity, the APS has had to review some of the methods originally employed and make changes as necessary. In addition, due to commissioning and operational needs, higher-level operator software needed to be created. EPICS has been flexible enough to allow this.

  7. Microvibration monitoring: some recent experiences in an operating microelectronics facility

    NASA Astrophysics Data System (ADS)

    Hassett, Kevin

    1992-02-01

    Major construction work is currently underway at Intel''s Aloha, Oregon, campus. Because of concerns about the effects that construction-generated vibration might have on adjacent ongoing microelectronics manufacturing activities, two important steps were taken. The first of these was to establish guidelines that would be followed by the construction contractor to limit vibration disturbance. The second was to install a computer-based monitoring system that would continuously measure the vibration on the floor of the microelectronics manufacturing facility. In this way, the vibration effects of the construction activities would be monitored and adjusted, by modifying procedures, if necessary. The monitoring program is discussed in this paper. The major characteristics of the monitoring system, the placement of the transducers, and the ways in which the data were managed are described. Some typical data are shown and discussed.

  8. The Joint Agricultural Weather Facility's Operational Assessment Program.

    NASA Astrophysics Data System (ADS)

    Motha, Raymond P.; Heddinghaus, Thomas R.

    1986-09-01

    The Joint Agricultural Weather Facility (JAWF), a cooperative effort between the Climate Analysis Center, NMC/NWS/NOAA (National Meteorological Center/National Weather Service/National Oceanic and Atmospheric Administration) and the World Agricultural Outlook Board, U.S. Department of Agriculture (USDA), focuses on weather anomalies and their effects on the crop-yield potential in major international crop areas. The basic mission is to provide an objective procedure for translating the flow of global weather information into timely and accurate assessments of growing-season conditions which ultimately impact on global agricultural production and trade. Daily monitoring of satellite weather images and meteorological data provides the framework for agricultural weather analysis. Daily. weekly, and seasonal summaries are processed and merged with historical weather and crop data for evaluation of the crop-yield potential. Information is disseminated at routine briefings, in written summaries, and through informal discussions.

  9. 49 CFR 1242.32 - Joint facility rents-debit and credit and joint facility-debit and credit (accounts 33-17-00, 33...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Joint facility rents-debit and credit and joint facility-debit and credit (accounts 33-17-00, 33-18-00, 33-19-00, 34-17-00, 34-18-00, 34-19-00, 37-17-00... PASSENGER SERVICE FOR RAILROADS 1 Operating Expenses-Way and Structures § 1242.32 Joint facility rents—debit...

  10. Design data package and operating procedures for MSFC solar simulator test facility

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Design and operational data for the solar simulator test facility are reviewed. The primary goal of the facility is to evaluate the performance capacibility and worst case failure modes of collectors, which utilize either air or liquid transport media. The facility simulates environmental parameters such as solar radiation intensity, solar spectrum, collimation, uniformity, and solar attitude. The facility also simulates wind conditions of velocity and direction, solar system conditions imposed on the collector, collector fluid inlet temperature, and geometric factors of collector tilt and azimuth angles. Testing the simulator provides collector efficiency data, collector time constant, incident angle modifier data, and stagnation temperature values.

  11. 3. NORTH ELEVATION OF THE HOT BAY, SHOWING RAILROAD TRACKS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. NORTH ELEVATION OF THE HOT BAY, SHOWING RAILROAD TRACKS LEADING TO THE MASSIVE STEEL-LINED CONCRETE ENTRANCE DOOR. PART OF THE INTRICATE HVAC SYSTEM IS WEST (RIGHT) OF THE DOOR. - Nevada Test Site, Engine Maintenance Assembly & Disassembly Facility, Area 25, Jackass Flats, Mercury, Nye County, NV

  12. Maintenance & Operations Solutions: Meeting the Challenge of Improving School Facilities.

    ERIC Educational Resources Information Center

    Association of School Business Officials International, Reston, VA.

    This paper examines the impact current maintenance and operations (M&O) practices have on U.S. school performance and offers possible opportunities for improvement through the judicious use of technology and methodology. The paper also presents a regional comparative analysis of M&O costs across the country. A list of equipment and their…

  13. Educational Systems for Operators of Water Pollution Control Facilities.

    ERIC Educational Resources Information Center

    Austin, John H., Ed.; Kesler, John, Ed.

    Several of the articles from this conference concern current activities of federal, state, and municipal governments, of universities and community colleges, and of industry in wastewater treatment plant operator training. The rest of the articles deal with instructional technology, explaining different facets of it and showing how it may be…

  14. Maintenance & Operations Solutions: Meeting the Challenge of Improving School Facilities.

    ERIC Educational Resources Information Center

    Association of School Business Officials International, Reston, VA.

    This paper examines the impact current maintenance and operations (M&O) practices have on U.S. school performance and offers possible opportunities for improvement through the judicious use of technology and methodology. The paper also presents a regional comparative analysis of M&O costs across the country. A list of equipment and their…

  15. Simulation Modeling of a Facility Layout in Operations Management Classes

    ERIC Educational Resources Information Center

    Yazici, Hulya Julie

    2006-01-01

    Teaching quantitative courses can be challenging. Similarly, layout modeling and lean production concepts can be difficult to grasp in an introductory OM (operations management) class. This article describes a simulation model developed in PROMODEL to facilitate the learning of layout modeling and lean manufacturing. Simulation allows for the…

  16. Simulation Modeling of a Facility Layout in Operations Management Classes

    ERIC Educational Resources Information Center

    Yazici, Hulya Julie

    2006-01-01

    Teaching quantitative courses can be challenging. Similarly, layout modeling and lean production concepts can be difficult to grasp in an introductory OM (operations management) class. This article describes a simulation model developed in PROMODEL to facilitate the learning of layout modeling and lean manufacturing. Simulation allows for the…

  17. 300 Area treated effluent disposal facility operating specifications document

    SciTech Connect

    Olander, A.R.

    1994-10-01

    These specifications deal with the release of treated water into the Columbia River via the TEDF submerged outfall. Specific limits are set for contaminants to be discharged in NPDES permit WA-002591-7. This section contains the operating ranges that will be used to best meet the permit limits.

  18. Expanded operational capabilities of the Langley Mach 7 Scramjet test facility

    NASA Technical Reports Server (NTRS)

    Thomas, S. R.; Guy, R. W.

    1983-01-01

    An experimental research program conducted to expand the operational capabilities of the NASA Langley Mach 7 Scramjet Test Facility is described. Previous scramjet testing in this facility was limited to a single simulated flight condition of Mach 6.9 at an altitude of 115,300 ft. The arc heater research demonstrates the potential of the facility for scramjet testing at simulated flight conditions from Mach 4 (at altitudes from 77,000 to 114,000 ft) to Mach 7 (at latitudes from 108,000 to 149,000 ft). Arc heater electrical characteristics, operational problems, measurements of nitrogen oxide contaminants, and total-temperature profiles are discussed.

  19. The potential for LNG as a railroad fuel in the U.S.

    SciTech Connect

    Fritz, S.G.

    2000-01-01

    Freight railroad operations in the US represent a substantial opportunity for liquefied natural gas (LNG) to displace diesel fuel. With the promise of achieving an overwhelming economic advantage over diesel fuel, this paper presents some discussion to the question, ``Why is the application of LNG for railroad use in the US moving so slowly?'' A brief overview of the freight railroad operations in the US is given, along with a summary of several railroad LNG demonstration projects. US Environmental Protection Agency and California Air Resources Board exhaust emission regulations may cause the railroad industry to move from small-scale LNG demonstration projects to using LNG as a primary freight railroad transportation fuel in selected regions or route-specific applications.

  20. Firm to build and operate RI waste-to-energy facility

    SciTech Connect

    Not Available

    1988-03-01

    The Rhode Island Solid Waste Management Corporation and Ogden Martin Systems have signed contracts for the construction and operation of a 750 ton-per-day (TPD) waste-to-energy facility. Representing the second of three facilities planned for the state, the project will be located on a 20-acre site adjacent to the Johnston landfill. In addition, a materials recovery facility and methane gas recovery project will be located within the same parcel. Both the methane gas project and the resource recovery facility will generate electricity for sale to the Narragansett Electric Company. The future facility will provide 17 megawatts (MW) of electricity. The design and construction cost for the future facility is $80 million, which will be financed with tax-exempt revenue bonds. Construction is expected to begin in 1989 and be completed in 1991.

  1. Coming of the Railroad, Unit V.

    ERIC Educational Resources Information Center

    Robinson, Terry

    Designed for elementary school students, this unit on the coming of the railroad in Wyoming provides concepts, activities, resource lists, and maps. Concepts stress the coming of the railroad in 1867-69, routes which were considered, towns owing their origin to the railroad, the railroad ownership of southern Wyoming, and the relationship between…

  2. Coming of the Railroad, Unit V.

    ERIC Educational Resources Information Center

    Robinson, Terry

    Designed for elementary school students, this unit on the coming of the railroad in Wyoming provides concepts, activities, resource lists, and maps. Concepts stress the coming of the railroad in 1867-69, routes which were considered, towns owing their origin to the railroad, the railroad ownership of southern Wyoming, and the relationship between…

  3. 75 FR 61835 - Jackson & Lansing Railroad Company-Trackage Rights Exemption-Norfolk Southern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ... Surface Transportation Board Jackson & Lansing Railroad Company--Trackage Rights Exemption-- Norfolk Southern Railway Company Pursuant to a written Assignment of Trackage Rights and Other Joint Facility Agreements (Trackage Agreement) dated September 16, 2010, Norfolk Southern Railway Company (NSR) has...

  4. Initial operation of the Tidd PFBC HGCU test facility

    SciTech Connect

    Hoffman, J.D.

    1992-01-01

    The objective of this program is to evaluate the design and obtain operating experience for up to two advanced particle filter (APF) systems through long-term testing on a slip stream at Ohio Power Company's Tidd PFBC Demonstration Plant. Performance and reliability of commercial-scale filter modules will be monitored to aid in an assessment of the readiness and economic viability of this technology for commercial PFBC applications. The engineering, and design of the hot gas piping systems modifications were completed during the summer of 1992, and in September, 1992 reassembly of the pipe sections began at Tidd. The HGCU system will be commissioned with the APF in October, 1992. Present plans are to operate the APF system throughout the rest of the Tidd three-year test program which is scheduled to end in February, 1994.

  5. Initial operation of the Tidd PFBC HGCU test facility

    SciTech Connect

    Hoffman, J.D.

    1992-12-31

    The objective of this program is to evaluate the design and obtain operating experience for up to two advanced particle filter (APF) systems through long-term testing on a slip stream at Ohio Power Company`s Tidd PFBC Demonstration Plant. Performance and reliability of commercial-scale filter modules will be monitored to aid in an assessment of the readiness and economic viability of this technology for commercial PFBC applications. The engineering, and design of the hot gas piping systems modifications were completed during the summer of 1992, and in September, 1992 reassembly of the pipe sections began at Tidd. The HGCU system will be commissioned with the APF in October, 1992. Present plans are to operate the APF system throughout the rest of the Tidd three-year test program which is scheduled to end in February, 1994.

  6. Operational facilities of remote control software of ranging measurement equipment

    NASA Astrophysics Data System (ADS)

    Becceneri, Jose Carlos

    The basic purpose of this paper is to document, in this symposium, the work performed for the construction of Ranging Management Software (RAN), which is one of the functions of the Satellite Control System (SICS) software developed by Instituto Nacional de Pesquisas Espaciais (INPE) to control the Brazilian satellites of MECB (Brazilian Complete Space Mission). This paper shows the RAN basic architecture as well as a set of functions which facilitates both the operation and the ranging system test.

  7. The biomechanical overload of the upper limb: a neglected occupational hazard in animal facility operators.

    PubMed

    Occhionero, Vincenzo; Ghersi, Rinaldo; Prandini, Lucio; Korpinen, Leena; Gobba, Fabriziomaria

    2017-03-01

    Data on biomechanical overload of the upper limb in animal facility operators are currently scanty. We decided to study this risk in a university animal facility. Eleven different tasks performed by operators were identified. For each of them, the biomechanical overload of the upper limb was evaluated by applying 4 different methods frequently used, hypothesising a task duration of 4 and 8 h. Then two 'typical' real working days of the examined facility were reconstructed, and the risk for operators was calculated using the OCRA Index, Checklist and Mini-Checklist. Considering the specific tasks, the results show some difference among methods, but the overall results show an acceptable/slight risk of biomechanical overload of the upper limb in animal facility operators during typical working days. Practitioner Summary: Upper limb biomechanical overload (UL-BO) is a neglected risk in animal facilities. In a university facility, 11 different tasks were identified, and 2 typical working days were analysed. Even if some task at increased risk may exist, during typical working days,  the overall results show that the risk of UL-BO in operators can be considered usually acceptable or, at worst, slight.

  8. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    SciTech Connect

    Not Available

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs.

  9. First U. S. coal gasification facility in commercial operation

    SciTech Connect

    Not Available

    1984-11-01

    This paper describes the first commercial scale coal gasification plant in America, located in Mercer County, North Dakota. Seven of the fourteen gasifier vessels have been operating, producing the medium-Btu raw gas steam necessary for further processing into pipeline quality gas. Coal gasification technology is by means of the Lurgi process. The complex, estimated at about $2.1 billion, is diagrammed. Plant input and output is also shown. There are 125 million recoverable tons of lignite with sufficient reserves for expansion as input for gasification. The complex is composed of numerous processing units and a block flow diagram of the complex is given.

  10. Operational facility-integrated computer system for safeguards

    SciTech Connect

    Armento, W.J.; Brooksbank, R.E.; Krichinsky, A.M.

    1980-01-01

    A computer system for safeguards in an active, remotely operated, nuclear fuel processing pilot plant has been developed. This sytem maintains (1) comprehensive records of special nuclear materials, (2) automatically updated book inventory files, (3) material transfer catalogs, (4) timely inventory estimations, (5) sample transactions, (6) automatic, on-line volume balances and alarmings, and (7) terminal access and applications software monitoring and logging. Future development will include near-real-time SNM mass balancing as both a static, in-tank summation and a dynamic, in-line determination. It is planned to incorporate aspects of site security and physical protection into the computer monitoring.

  11. Long pulse, high power operation of the ELISE test facility

    NASA Astrophysics Data System (ADS)

    Wünderlich, D.; Kraus, W.; Fröschle, M.; Riedl, R.; Fantz, U.; Heinemann, B.

    2017-08-01

    The ion source of the ELISE test facility (0.9×1.0 m2 with an extraction area of 0.1 m2) has half the size of the ion source foreseen for the ITER NBI beam lines. Aim of ELISE is to demonstrate that such large RF driven negative ion sources can achieve the following parameters at a filling pressure of 0.3 Pa and for pulse lengths of up to one hour: extracted current densities of 28.5 mA/cm2 in deuterium and 33.0 mA/cm2 in hydrogen, a ratio of co-extracted electrons to extracted ions below one and deviations in the uniformity of the extracted beam of less than 10 %. From the results obtained at ELISE so far it can be deduced that for demonstrating the ITER parameters, an RF power of 80 kW/driver will be necessary, i.e. final aim is to demonstrate long pulses (up to one hour) at this power level and a stable source performance. The most crucial factor limiting the source performance during such pulses - in particular in deuterium - is a steady increase in the co-extracted electron current. This paper reports measures that counteract this steady increase, namely applying a dedicated long pulse caesium conditioning technique and modifying the filter field topology by adding strengthening external permanent magnets. Additionally, RF issues are discussed that prevented increasing the RF power towards the target value. Although it was not possible up to now to perform long pulses at 80 kW/driver, a significant improvement of the source performance and its stability are demonstrated. The latter allowed performing the very first 1 h deuterium pulse in ELISE.

  12. The Mixed Waste Management Facility. Design basis integrated operations plan (Title I design)

    SciTech Connect

    1994-12-01

    The Mixed Waste Management Facility (MWMF) will be a fully integrated, pilotscale facility for the demonstration of low-level, organic-matrix mixed waste treatment technologies. It will provide the bridge from bench-scale demonstrated technologies to the deployment and operation of full-scale treatment facilities. The MWMF is a key element in reducing the risk in deployment of effective and environmentally acceptable treatment processes for organic mixed-waste streams. The MWMF will provide the engineering test data, formal evaluation, and operating experience that will be required for these demonstration systems to become accepted by EPA and deployable in waste treatment facilities. The deployment will also demonstrate how to approach the permitting process with the regulatory agencies and how to operate and maintain the processes in a safe manner. This document describes, at a high level, how the facility will be designed and operated to achieve this mission. It frequently refers the reader to additional documentation that provides more detail in specific areas. Effective evaluation of a technology consists of a variety of informal and formal demonstrations involving individual technology systems or subsystems, integrated technology system combinations, or complete integrated treatment trains. Informal demonstrations will typically be used to gather general operating information and to establish a basis for development of formal demonstration plans. Formal demonstrations consist of a specific series of tests that are used to rigorously demonstrate the operation or performance of a specific system configuration.

  13. Construction and operation of an improved radiation calibration facility at Brookhaven National Laboratory. Environmental assessment

    SciTech Connect

    1994-10-01

    Calibration of instruments used to detect and measure ionizing radiation has been conducted over the last 20 years at Brookhaven National Laboratory`s (BNL) Radiation Calibration Facility, Building 348. Growth of research facilities, projects in progress, and more stringent Department of Energy (DOE) orders which involve exposure to nuclear radiation have placed substantial burdens on the existing radiation calibration facility. The facility currently does not meet the requirements of DOE Order 5480.4 or American National Standards Institute (ANSI) N323-1978, which establish calibration methods for portable radiation protection instruments used in the detection and measurement of levels of ionizing radiation fields or levels of radioactive surface contaminations. Failure to comply with this standard could mean instrumentation is not being calibrated to necessary levels of sensitivity. The Laboratory has also recently obtained a new neutron source and gamma beam irradiator which can not be made operational at existing facilities because of geometry and shielding inadequacies. These sources are needed to perform routine periodic calibrations of radiation detecting instruments used by scientific and technical personnel and to meet BNL`s substantial increase in demand for radiation monitoring capabilities. To place these new sources into operation, it is proposed to construct an addition to the existing radiation calibration facility that would house all calibration sources and bring BNL calibration activities into compliance with DOE and ANSI standards. The purpose of this assessment is to identify potential significant environmental impacts associated with the construction and operation of an improved radiation calibration facility at BNL.

  14. 49 CFR 1242.64 - Joint facility-debit and credit (accounts 37-51-00 and 38-51-00).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Joint facility-debit and credit (accounts 37-51-00... RAILROADS 1 Operating Expenses-Transportation § 1242.64 Joint facility—debit and credit (accounts 37-51-00... assigned according to the use made of each facility by the reporting carrier, regardless of the use made of...

  15. 49 CFR 1242.81 - Joint facility-debit and credit (accounts 37-55-00 and 38-55-00).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Joint facility-debit and credit (accounts 37-55-00... RAILROADS 1 Operating Expenses-Transportation § 1242.81 Joint facility—debit and credit (accounts 37-55-00... according to the use made of each facility by the reporting carriers, regardless of the use made of the...

  16. 49 CFR 1242.71 - Joint facility-debit and credit (accounts 37-52-00 and 38-52-00).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Joint facility-debit and credit (accounts 37-52-00... RAILROADS 1 Operating Expenses-Transportation § 1242.71 Joint facility—debit and credit (accounts 37-52-00... assigned according to the use made of each facility by the reporting carriers, regardless of the use made...

  17. 77 FR 26321 - Reed College, Reed Research Nuclear Reactor, Renewed Facility Operating License No. R-112

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ... COMMISSION Reed College, Reed Research Nuclear Reactor, Renewed Facility Operating License No. R-112 AGENCY... access publicly-available documents online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html... License No. R- 112, held by Reed College (the licensee), which authorizes continued operation of the Reed...

  18. 78 FR 37594 - Application and Amendment to Facility Operating License Involving Proposed No Significant Hazards...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... generator structural integrity performance criterion (SIPC) be demonstrated up to 70% Rated Thermal Power (2406.6 megawatts thermal), and added a footnote to the Facility Operating License Condition 2.C(1) ``Maximum Power Level,'' to restrict operation of SONGS Unit 2 to no more than 70% Rated Thermal Power...

  19. 77 FR 43374 - Biweekly Notice, Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... the facility. The proposed changes do not affect any plant operations, design functions, or analyses... proposed change will not result in plant operation in a configuration outside the design bases. The... precursor to any accident or transient. Plant design is not being modified by the proposed change....

  20. Operation of N Reactor and Fuels Fabrication Facilities, Hanford Reservation, Richland, Benton County, Washington: Environmental assessment

    SciTech Connect

    Not Available

    1980-08-01

    Environmental data, calculations and analyses show no significant adverse radiological or nonradiological impacts from current or projected future operations resulting from N Reactor, Fuels Fabrication and Spent Fuel Storage Facilities. Nonoccupational radiation exposures resulting from 1978 N Reactor operations are summarized and compared to allowable exposure limits.

  1. 76 FR 12140 - Clinton Power Station Notice of Withdrawal of Application for Amendment to Facility Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Clinton Power Station Notice of Withdrawal of Application for Amendment to Facility Operating... Operating License No. NPF-62 for the Clinton Power Station, Unit 1, located in DeWitt County, Illinois....

  2. 77 FR 1743 - Facility Operating License Amendment From Florida Power Corporation, Crystal River Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... COMMISSION Facility Operating License Amendment From Florida Power Corporation, Crystal River Nuclear... Florida Power Corporation for operation of the Crystal River Nuclear Generating Plant, Unit 3. The proposed amendment would increase the licensed core power level for Crystal River Nuclear Generating Plant...

  3. Railroad Valley, Nevada

    NASA Technical Reports Server (NTRS)

    2001-01-01

    Information from images of Railroad Valley, Nevada captured on August 17,2001 by the Advanced Spaceborne Thermal Emission and Reflection Radiometer(ASTER) may provide a powerful tool for monitoring crop health and maintenance procedures.

    These images cover an area of north central Nevada. The top image shows irrigated fields, with healthy vegetation in red. The middle image highlights the amount of vegetation. The color code shows highest vegetation content in red, orange, yellow, green, blue, and purple and the lowest in black. The final image is a thermal infrared channel, with warmer temperatures in white and colder in black.

    In the thermal image, the northernmost and westernmost fields are markedly colder on their northwest areas, even though no differences are seen in the visible image or the second, Vegetation Index image. This can be attributed to the presence of excess water, which can lead to crop damage.

    The Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER)is an imaging instrument that is flying on Terra, a satellite launched in December 1999 as part of NASA's Earth Observing System (EOS). The instrument is being used to obtain detailed maps of land surface temperature, emissivity, reflectance and elevation. The Earth Observing System (EOS) platforms are part of NASA's Earth Science Enterprise, whose goal is to obtain a better understanding of the interactions between the biosphere, hydrosphere, lithosphere and atmosphere.

    NASA's Jet Propulsion Laboratory is a division of the California Institute of Technology, Pasadena.

  4. High Performance Computing Facility Operational Assessment, CY 2011 Oak Ridge Leadership Computing Facility

    SciTech Connect

    Baker, Ann E; Barker, Ashley D; Bland, Arthur S Buddy; Boudwin, Kathlyn J.; Hack, James J; Kendall, Ricky A; Messer, Bronson; Rogers, James H; Shipman, Galen M; Wells, Jack C; White, Julia C; Hudson, Douglas L

    2012-02-01

    Oak Ridge National Laboratory's Leadership Computing Facility (OLCF) continues to deliver the most powerful resources in the U.S. for open science. At 2.33 petaflops peak performance, the Cray XT Jaguar delivered more than 1.4 billion core hours in calendar year (CY) 2011 to researchers around the world for computational simulations relevant to national and energy security; advancing the frontiers of knowledge in physical sciences and areas of biological, medical, environmental, and computer sciences; and providing world-class research facilities for the nation's science enterprise. Users reported more than 670 publications this year arising from their use of OLCF resources. Of these we report the 300 in this review that are consistent with guidance provided. Scientific achievements by OLCF users cut across all range scales from atomic to molecular to large-scale structures. At the atomic scale, researchers discovered that the anomalously long half-life of Carbon-14 can be explained by calculating, for the first time, the very complex three-body interactions between all the neutrons and protons in the nucleus. At the molecular scale, researchers combined experimental results from LBL's light source and simulations on Jaguar to discover how DNA replication continues past a damaged site so a mutation can be repaired later. Other researchers combined experimental results from ORNL's Spallation Neutron Source and simulations on Jaguar to reveal the molecular structure of ligno-cellulosic material used in bioethanol production. This year, Jaguar has been used to do billion-cell CFD calculations to develop shock wave compression turbo machinery as a means to meet DOE goals for reducing carbon sequestration costs. General Electric used Jaguar to calculate the unsteady flow through turbo machinery to learn what efficiencies the traditional steady flow assumption is hiding from designers. Even a 1% improvement in turbine design can save the nation billions of gallons of

  5. Modelling and operation strategies of DLR's large scale thermocline test facility (TESIS)

    NASA Astrophysics Data System (ADS)

    Odenthal, Christian; Breidenbach, Nils; Bauer, Thomas

    2017-06-01

    In this work an overview of the TESIS:store thermocline test facility and its current construction status will be given. Based on this, the TESIS:store facility using sensible solid filler material is modelled with a fully transient model, implemented in MATLAB®. Results in terms of the impact of filler site and operation strategies will be presented. While low porosity and small particle diameters for the filler material are beneficial, operation strategy is one key element with potential for optimization. It is shown that plant operators have to ponder between utilization and exergetic efficiency. Different durations of the charging and discharging period enable further potential for optimizations.

  6. Experiments in hand-operated, hypersonic shock tunnel facility

    NASA Astrophysics Data System (ADS)

    Sudhiesh Kumar, Chintoo; Reddy, K. P. J.

    2016-11-01

    Experiments were conducted using the newly developed table-top, hand-operated hypersonic shock tunnel, otherwise known as the Reddy hypersonic shock tunnel. This novel instrument uses only manual force to generate the shock wave in the shock tube, and is designed to generate a freestream flow of Mach 6.5 in the test section. The flow was characterized using stagnation point pressure measurements made using fast-acting piezoelectric transducers. Schlieren visualization was also carried out to capture the bow shock in front of a hemispherical body placed in the flow. Freestream Mach numbers estimated at various points in the test section showed that for a minimum diameter of 46 mm within the test section, the value did not vary by more than 3 % along any cross-sectional plane. The results of the experiments presented here indicate that the device may be successfully employed for basic hypersonic research activities at the university level.

  7. Overview of the DOE Waste Facilities Operations Robotics Technology Development Program

    SciTech Connect

    Ward, C.R.

    1992-07-01

    The Department of Energy`s Office of Technology Development has initiated a Robotics Technology Development Program that includes technology aimed at DOE Waste Facilities Operations (WFO). Much of this technology may also be applicable to waste facilities outside of DOE and will be available for use. This is a team effort of several DOE Laboratories and Sites. The WFO team includes the Savannah River Technology Center, Sandia National Laboratories, Oak Ridge National Laboratory, Idaho National Engineering Laboratory, Lawrence Livermore National Laboratory, the Fernald Environmental Management Project and the Waste Isolation Pilot Plant. DOE has waste facilities currently in operation at many sites and many more of these facilities are planned as part of the DOE site cleanup effort. As the cleanup continues, existing facilities and new facilities will be taxed with an increasing volume of waste, more varied waste streams, more complex processing requirements, more challenging waste characteristics, more stringent waste form criteria, and stricter regulations. The WFO Robotics Technology Development Program will address these challenges by developing robotic systems technology that will be safer, better, faster, and cheaper than existing technology. The goals of this technology development are to remove humans from both radiologically and physically dangerous environments in waste facilities, improve the quality and quality assurance of operations, increase the throughput of operations, increase the flexibility of facilities, reduce the manpower requirements for operations and meet federal, state and local regulations. There are four areas within the WFO program; the Mixed Waste Treatment Project, Stored Waste, the Waste Isolation Pilot Plant and Remote Size Reduction.

  8. Pre-operational environmental monitoring plan for the Device Assembly Facility at the Nevada Test Site

    SciTech Connect

    Ferate, F.D.

    1995-01-01

    Nuclear explosives operations have been and may continue to be an important component of the DOE mission at the NTS. This mission has been to conduct the nation`s nuclear testing program in a safe, secure, and efficient manner while assuring full compliance with state and federal regulations, and DOE order`s and directives. These operations have generally included assembly, disassembly or modification, staging, transportation, and tesbng of nuclear explosive devices. They may also include maintenance, repair, retrofit, and surveillance. The Device Assembly Facility (DAF) was constructed to provide a dedicated facility in which to prepare nuclear explosives assemblies for their intended disposition. This facility will provide for combined operations (replacing two separate facilities) and incorporates state-of-the-art safety and security features while minimizing the risks of environmental impacts. The facility has been completed but not yet operated, so the impacts to be considered will b e based on normal operations and not on the impacts of construction activities. The impacts will arise from nuclear explosives operations that require the handling of high explosives in combination with special nuclear materials. Wastes from operation of the earlier device assembly facilities have included grams of epoxies, pints of solvents, and small quantities of waste explosives. These are hazardous (includes radioactive) wastes and are disposed of in accordance with state and federal regulations. Assuming similar operations at the DAF, non-hazardous (includes non-radioactive) solid waste would be transported to a permitted landfill. Waste explosives would be sent to the Area 11 Explosive Ordnance Disposal Unit. Other hazardous waste would be sent to the Area 5 Radioactive Waste.Management Site for shipment or burial.

  9. Architecture and operation of the Z Pulsed Power Facility vacuum system.

    SciTech Connect

    Riddle, Allen Chauncey; Petmecky, Don; Weed, John Woodruff

    2010-11-01

    The Z Pulsed Power Facility at Sandia National Laboratories in Albuquerque, New Mexico, USA is one of the world's premier high energy density physics facilities. The Z Facility derives its name from the z-pinch phenomena which is a type of plasma confinement system that uses the electrical current in the plasma to generate a magnetic field that compresses it. Z refers to the direction of current flow, the z axis in a three dimensional Cartesian coordinate system. The multiterawatt, multimegajoule electrical pulse the Facility produces is 100-400 nanoseconds in time. Research and development programs currently being conducted on the Z Facility include inertial confinement fusion, dynamic material properties, laboratory astrophysics and radiation effects. The Z Facility vacuum system consists of two subsystems, center section and load diagnostics. Dry roughing pumps and cryogenic high vacuum pumps are used to evacuate the 40,000 liter, 200 square meter center section of the facility where the experimental load is located. Pumping times on the order of two hours are required to reduce the pressure from atmospheric to 10{sup -5} Torr. The center section is cycled from atmosphere to high vacuum for each experiment. The facility is capable of conducting one to two experiments per day. Numerous smaller vacuum pumping systems are used to evacuate load diagnostics. The megajoules of energy released during an experiment causes damage to the Facility that presents numerous challenges for reliable operation of the vacuum system.

  10. Joint Assessment of ETRR-2 Research Reactor Operations Program, Capabilities, and Facilities

    SciTech Connect

    Bissani, M; O'Kelly, D S

    2006-05-08

    A joint assessment meeting was conducted at the Egyptian Atomic Energy Agency (EAEA) followed by a tour of Egyptian Second Research Reactor (ETRR-2) on March 22 and 23, 2006. The purpose of the visit was to evaluate the capabilities of the new research reactor and its operations under Action Sheet 4 between the U.S. DOE and the EAEA, ''Research Reactor Operation'', and Action Sheet 6, ''Technical assistance in The Production of Radioisotopes''. Preliminary Recommendations of the joint assessment are as follows: (1) ETRR-2 utilization should be increased by encouraging frequent and sustained operations. This can be accomplished in part by (a) Improving the supply-chain management for fresh reactor fuel and alleviating the perception that the existing fuel inventory should be conserved due to unreliable fuel supply; and (b) Promulgating a policy for sample irradiation priority that encourages the use of the reactor and does not leave the decision of when to operate entirely at the discretion of reactor operations staff. (2) Each experimental facility in operation or built for a single purpose should be reevaluated to focus on those that most meet the goals of the EAEA strategic business plan. Temporary or long-term elimination of some experimental programs might be necessary to provide more focused utilization. There may be instances of emerging reactor applications for which no experimental facility is yet designed or envisioned. In some cases, an experimental facility may have a more beneficial use than the purpose for which it was originally designed. For example, (a) An effective Boron Neutron Capture Therapy (BNCT) program requires nearby high quality medical facilities. These facilities are not available and are unlikely to be constructed near the Inshas site. Further, the BNCT facility is not correctly designed for advanced research and therapy programs using epithermal neutrons. (b) The ETRR-2 is frequently operated to provide color-enhanced gemstones but is

  11. History of remote operations and robotics in nuclear facilities

    SciTech Connect

    Herndon, J.N.

    1992-01-01

    The field of remote technology is continuing to evolve to support man's efforts to perform tasks in hostile environments. Remote technology has roots which reach into the early history of man. Fireplace pokers, blacksmith's tongs, and periscopes are examples of the beginnings of remote technology. The technology which we recognize today has evolved over the last 45-plus years to support human operations in hostile environments such as nuclear fission and fusion, space, underwater, hazardous chemical, and hazardous manufacturing. The four major categories of approach to remote technology have been (1) protective clothing and equipment for direct human entry, (2) extended reach tools using distance for safety, (3) telemanipulators with barriers for safety, and (4) teleoperators incorporating mobility with distance and/or barriers for safety. The government and commercial nuclear industry has driven the development of the majority of the actual teleoperator hardware available today. This hardware has been developed due to the unsatisfactory performance of the protective-clothing approach in many hostile applications. Systems which have been developed include crane/impact wrench systems, unilateral power manipulators, mechanical master/slaves, and servomanipulators. Work for space applications has been primarily research oriented with few successful space applications, although the shuttle's remote manipulator system has been successful. In the last decade, underwater applications have moved forward significantly, with the offshore oil industry and military applications providing the primary impetus. This document consists of viewgraphs and subtitled figures.

  12. Operating experience review - Ventilation systems at Department of Energy Facilities

    SciTech Connect

    Not Available

    1994-05-01

    The Office of Special Projects (DP-35), formerly Office of Self-Assessment (DP-9), analyzed occurrences caused by problems with equipment and material and recommended the following systems for an in-depth study: (1) Selective Alpha Air Monitor (SAAM), (2) Emergency Diesel Generator, (3) Ventilation System, (4) Fire Alarm System. Further, DP-35 conducted an in-depth review of the problems associated with SAAM and with diesel generators, and made several recommendations. This study focusses on ventilation system. The intent was to determine the causes for the events related to these system that were reported in the Occurrence Reporting and Processing System (ORPS), to identify components that failed, and to provide technical information from the commercial and nuclear industries on the design, operation, maintenance, and surveillance related to the system and its components. From these data, sites can develop a comprehensive program of maintenance management, including surveillance, to avoid similar occurrences, and to be in compliance with the following DOE orders.

  13. Operational Radiation Protection in Synchrotron Light and Free Electron Laser Facilities

    SciTech Connect

    Liu, James C.; Rokni, Sayed H.; Vylet, Vaclav; /Jefferson Lab

    2009-12-11

    The 3rd generation synchrotron radiation (SR) facilities are storage ring based facilities with many insertion devices and photon beamlines, and have low injection beam power (< few tens of watts), but extremely high stored beam power ({approx} 1 GW). The 4th generation x-ray free electron laser (FEL) facilities are based on an electron Linac with a long undulator and have high injection beam power (a few kW). Due to its electron and photon beam characteristics and modes of operation, storage ring and photon beamlines have unique safety aspects, which are the main subjects of this paper. The shielding design limits, operational modes, and beam losses are first reviewed. Shielding analysis (source terms and methodologies) and interlocked safety systems for storage ring and photon beamlines (including SR and gas bremsstrahlung) are described. Specific safety issues for storage ring top-off injection operation and FEL facilities are discussed. The operational safety program, e.g., operation authorization, commissioning, training, and radiation measurements, for SR facilities is also presented.

  14. 43 CFR 3276.12 - What information must I give BLM in the monthly report for facility operations?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... facilities, include in your monthly report of facility operations: (1) Mass of steam and/or hot water, in klbs, used or brought into the facility. For facilities using both steam and hot water, you must report the mass of each; (2) The temperature of the steam or hot water in deg. F; (3) The pressure of...

  15. 43 CFR 3276.12 - What information must I give BLM in the monthly report for facility operations?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... facilities, include in your monthly report of facility operations: (1) Mass of steam and/or hot water, in klbs, used or brought into the facility. For facilities using both steam and hot water, you must report the mass of each; (2) The temperature of the steam or hot water in deg. F; (3) The pressure of...

  16. 43 CFR 3276.12 - What information must I give BLM in the monthly report for facility operations?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... facilities, include in your monthly report of facility operations: (1) Mass of steam and/or hot water, in klbs, used or brought into the facility. For facilities using both steam and hot water, you must report the mass of each; (2) The temperature of the steam or hot water in deg. F; (3) The pressure of...

  17. 43 CFR 3276.12 - What information must I give BLM in the monthly report for facility operations?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... facilities, include in your monthly report of facility operations: (1) Mass of steam and/or hot water, in klbs, used or brought into the facility. For facilities using both steam and hot water, you must report the mass of each; (2) The temperature of the steam or hot water in deg. F; (3) The pressure of...

  18. Model training curriculum for Low-Level Radioactive Waste Disposal Facility Operations

    SciTech Connect

    Tyner, C.J.; Birk, S.M.

    1995-09-01

    This document is to assist in the development of the training programs required to be in place for the operating license for a low-level radioactive waste disposal facility. It consists of an introductory document and four additional appendixes of individual training program curricula. This information will provide the starting point for the more detailed facility-specific training programs that will be developed as the facility hires and trains new personnel and begins operation. This document is comprehensive and is intended as a guide for the development of a company- or facility-specific program. The individual licensee does not need to use this model training curriculum as written. Instead, this document can be used as a menu for the development, modification, or verification of customized training programs.

  19. LESSONS LEARNED - STARTUP AND TRANSITION TO OPERATIONS AT THE 200 WEST PUMP AND TREAT FACILITY

    SciTech Connect

    FINK DE; BERGQUIST GG; BURKE SP

    2012-10-03

    This document lists key Lessons Learned from the Startup Team for the 200 West Pump and Treat Facility Project. The Startup Team on this Project was an integrated, multi-discipline team whose scope was Construction Acceptance Testing (CAT), functional Acceptance Testing Procedures (ATP), and procedure development and implementation. Both maintenance and operations procedures were developed. Included in the operations procedures were the process unit operations. In addition, a training and qualification program was also part of the scope.

  20. Hazard and operability study of the multi-function Waste Tank Facility. Revision 1

    SciTech Connect

    Hughes, M.E.

    1995-05-15

    The Multi-Function Waste Tank Facility (MWTF) East site will be constructed on the west side of the 200E area and the MWTF West site will be constructed in the SW quadrant of the 200W site in the Hanford Area. This is a description of facility hazards that site personnel or the general public could potentially be exposed to during operation. A list of preliminary Design Basis Accidents was developed.

  1. Operational modes for a wave injection facility aboard spacelab and a sub-satellite

    NASA Technical Reports Server (NTRS)

    Dyson, P. L.

    1978-01-01

    Various modes of operation are described for an orbiting wave injection facility planned to measure the properties of waves propagating in space plasma. Such a facility would cover a wide frequency range including MF and HF. Phase shift and Doppler shift measurements will yield more accurate measurements of echo time delay and the angle of arrival. Because Spacelab will involve some sub-satellites, some consideration is given to propagation between two vehicles both at HF and VHF.

  2. Aeroacoustic research facilities at NASA Langley Research Center: Description and operational characteristics

    NASA Technical Reports Server (NTRS)

    Hubbard, H. H.; Manning, J. C.

    1983-01-01

    A number of facilities were developed which provide unique test capabilities for aeroacoustic research. Information regarding physical layouts, dimensions, construction features, and operating capabilities of these facilities is compiled. Possible research applications include the behavior of such noise sources as jets, rotors, and propellers in simulated forward motion; studies of noise due to the interactions of aerodynamic flows with solid surfaces and bodies; sound propagation in ducts with airflow; and the evaluation of acoustical materials.

  3. Environmental monitoring for detection of uranium enrichment operations: Comparison of LEU and HEU facilities

    SciTech Connect

    Hembree, D.M. Jr.; Carter, J.A.; Ross, H.H.

    1995-03-01

    In 1994, the International Atomic Energy Agency (IAEA) initiated an ambitious program of worldwide field trials to evaluate the utility of environmental monitoring for safeguards. Part of this program involved two extensive United States field trials conducted at the large uranium enrichment facilities. The Paducah operation involves a large low-enriched uranium (LEU) gaseous diffusion plant while the Portsmouth facilities include a large gaseous diffusion plant that has produced both LEU and high-enriched uranium (HEU) as well as an LEU centrifuge facility. As a result of the Energy Policy Act of 1992, management of the uranium enrichment operations was assumed by the US Enrichment Corporation (USEC). The facilities are operated under contract by Martin Marietta Utility Services. Martin Marietta Energy Systems manages the environmental restoration and waste management programs at Portsmouth and Paducah for DOE. These field trials were conducted. Samples included swipes from inside and outside process buildings, vegetation and soil samples taken from locations up to 8 km from main sites, and hydrologic samples taken on the sites and at varying distances from the sites. Analytical results from bulk analysis were obtained using high abundance sensitivity thermal ionization mm spectrometers (TIMS). Uranium isotopics altered from the normal background percentages were found for all the sample types listed above, even on vegetation 5 km from one of the enrichment facilities. The results from these field trials demonstrate that dilution by natural background uranium does not remove from environmental samples the distinctive signatures that are characteristic of enrichment operations. Data from swipe samples taken within the enrichment facilities were particularly revealing. Particulate analysis of these swipes provided a detailed ``history`` of both facilities, including the assays of the end product and tails for both facilities.

  4. 76 FR 1666 - Susquehanna Union Railroad Company-Control Exemption-North Shore Railroad Company, Nittany & Bald...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... Surface Transportation Board Susquehanna Union Railroad Company--Control Exemption--North Shore Railroad Company, Nittany & Bald Eagle Railroad Company, Shamokin Valley Railroad Company, Juniata Valley Railroad Company, Lycoming Valley Railroad Company, and Union County Industrial Railroad Company On April 12,...

  5. Reference Mission Operational Analysis Document (RMOAD) for the Life Sciences Research Facilities

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The space station will be constructed during the next decade as an orbiting, low-gravity, permanent facility. The facility will provide a multitude of research opportunities for many different users. The pressurized research laboratory will allow life scientists to study the effects of long-term exposure to microgravity on humans, animals, and plants. The results of these studies will increase our understanding of this foreign environment on basic life processes and ensure the safety of man's long-term presence in space. This document establishes initial operational requirements for the use of the Life Sciences Research Facility (LSRF) during its construction.

  6. An operations concept for the Space Station based Astrometric Telescope Facility

    NASA Technical Reports Server (NTRS)

    Jackson, Robert W.; Smith, Martha A.

    1988-01-01

    The Astrometric Telescope Facility (AFT) will be an orbiting observatory which has been proposed to be attached to the NASA Space Station. The primary scientific objectives of the ATF will be to search for extrasolar planetary systems and to study their characteristics. In addition, the ATF will be able to perform other general astrometric observations of stars within the Milky Way Galaxy. Astrometric Telescope Facility operations from the Space Station will be simple and straightforward compared to other orbiting free-flying telescopes. The astrometric approach to planetary detection, which uses repeated measurements of the same set of target stars over many years, is compatible with simple, repetitive operations of the facility. The support provided by the Space Station and anomaly tolerance features of the ATF design also contribute to the simplicity of the operations concept.

  7. New facilities, new challenges: the telescope and instrument operators evolution at ESO

    NASA Astrophysics Data System (ADS)

    Pino Pavez, Andres; Brillant, Stéphane; Cerda, Susana; Mérand, Antoine; Mieske, Steffen; Smette, Alain; Romero, Cristian M.

    2016-07-01

    Observatories and operational strategies are evolving in connection with the facilities that will be built. For those new facilities, the strategy for dealing with the telescopes, instrumentation, data-flow, reduction process and relationship with the community is more or less handled from its conception. However, for those Observatories already in place, the challenge is to adapt the processes and prepare the existing people for these changes. This talk will show detailed information about current activities, the implemented training plan, the definition of the current operational model, the involvement of the group in projects towards improving operational processes and efficiency, and what new challenges will be involved during the definition of the strategies for the new generation instruments and facilities to be installed.

  8. Safety of high speed ground transportation systems. High speed passenger trains in freight railroad corridors: Operations and safety considerations. Final report, September 1993-April 1994

    SciTech Connect

    Ullman, K.B.; Bing, A.J.

    1994-12-01

    This report presents the results of a study into some operations and technical issues likely to be encountered when planning for high-speed rail passenger service on corridors that presently carry freight or commuter traffic. The study starts with a review of corridors designated under Section 1010 of the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991, a potential future high-speed corridors. After a review of signal, train control and braking systems presently used in the United States and elsewhere, the study provides analyses of the safety and operations impacts of introducing high-speed rail service on the hypothetical corridor. The safety analysis established a safety performance target based on present intercity rail safety performance, and reviewed the need for and benefits from safety improvements for high speed operation. The operations analysis concentrated on the impacts on track capacity and train delays of introducing a high-speed rail service on three hypothetical existing corridors with different track layouts and signal systems.

  9. Surface production operations, Volume 1: Design of oil-handling facilities

    SciTech Connect

    Arnold, K.; Stewart, M. Jr.

    1986-01-01

    Surface Production Operations is intended as a textbook and reference for the design of equipment for separation and treatment of gas, oil and water. This volume discusses separating and treating equipment and their operations, as well as facility types with suggestions on choosing a process. This book covers fluid properties and demonstrates theory and practical design techniques for gas/liquid separators, oil/water separators, oil- and water-treating equipment as well as system piping requirements. It examines two- and three- phase separators along with process calculations and concludes with a look at facility management.

  10. Gemini Observatory base facility operations: systems engineering process and lessons learned

    NASA Astrophysics Data System (ADS)

    Serio, Andrew; Cordova, Martin; Arriagada, Gustavo; Adamson, Andy; Close, Madeline; Coulson, Dolores; Nitta, Atsuko; Nunez, Arturo

    2016-08-01

    Gemini North Observatory successfully began nighttime remote operations from the Hilo Base Facility control room in November 2015. The implementation of the Gemini North Base Facility Operations (BFO) products was a great learning experience for many of our employees, including the author of this paper, the BFO Systems Engineer. In this paper we focus on the tailored Systems Engineering processes used for the project, the various software tools used in project support, and finally discuss the lessons learned from the Gemini North implementation. This experience and the lessons learned will be used both to aid our implementation of the Gemini South BFO in 2016, and in future technical projects at Gemini Observatory.

  11. Separate and unsanitary: African American women railroad car cleaners and the Women's Service Section, 1918-1920.

    PubMed

    Muhammad, Robin Dearmon

    2011-01-01

    The Women's Service Section (WSS) investigated federally controlled railroad stations and yards at the end of World War I. Few women worked in car cleaning before the war, and railroad management preferred to block women workers, especially African Americans, from gaining any kind of foothold in railroad work. African American women were the single largest group of railroad car cleaners during this period but they were routinely denied adequate facilities, including toilets, locker rooms, and dining facilities throughout the railroad system. By raising the issues of facilities, workers' rights, and public health, these women shaped federal policy and widened the agenda of the WSS to include a direct attack on segregated workplaces. This article argues that African American women car cleaners launched an industrial campaign that wove together concerns about racism, sexism, and health issues, and successfully removed barriers to women working in a predominately male industry.

  12. Response of spawning lake sturgeons to change in hydroelectric facility operation

    SciTech Connect

    Auer, N.A.

    1996-01-01

    Spawning of lake sturgeon Acipenser fulvescens was documented from 1987 to 1992 below the Prickett hydroelectric facility on the Sturgeon River, a tributary to Portage Lake, Michigan. Lake sturgeons were captured at the spawning site with dip nets during periods of reduced flow. A change in the spawning characteristics of the population was noted that corresponded to a changed in the operation of the hydroelectric facility. In 1987 and 1988 the facility operated in a peaking mode, which resulted in large daily fluctuations in river flows. The years 1989 and 1990 were years of transition, and in 1991 and 1992 the facility released near run-of-the-river (ROR) flows. Under near-ROR flows, which were more natural, adult lake sturgeons spent 4-6 weeks less at the spawning sites, 74% more fish were observed, weights were greater due to a 68% increase in number of females, and fish had increased reproductive readiness. The change in flow regime was the result of a Federal Energy Regulatory Commission relicensing action. The positive response observed in lake sturgeon spawning activity that resulted from the change of facility operation to near-ROR flows should be beneficial to the survival and perpetuation of this population. Similar results may be experienced in other lake sturgeon waters affected by manipulated flow regimes. 28 refs., 5 figs., 6 tabs.

  13. Environmental justification for railroad electrification. Final report

    SciTech Connect

    Bernard, M.J. III; Thorpe, A.B.

    1993-12-01

    In a 1991 workshop, electric utility managers asked the Electric Power Research Institute (EPRI) to address the question of railroad electrification in light of both urban air problems associated with transportation and our national transportation system`s dependence on petroleum fuels. In response, EPRI presents this economic and environmental analysis. This analysis is different from many previous studies in two ways: it determines the capital and operating cost differentials between diesel locomotive trains and electric locomotive trains; it also assigns a dollar value to the environmental costs associated with air pollution from diesel and electric train operations. This study`s purpose is to compare financial costs of rail electrification with environmental costs from air emissions impacts in four case studies: Boston, Chicago, Los Angeles, and San Francisco. These urban regions were chosen because they have different railroad characteristics and they all have air quality problems. This study will present a snapshot of the year 2000 to compare the economics in each region of two scenarios: the rail lines remain diesel power or are electrified. Because of the increase in capital and operating cost, rail electrification is not financially viable in any of these regions. Yet when the benefit of reduced air emissions, typically an {open_quotes}external{close_quotes} value, is included in the analysis, rail electrification may be economically viable.

  14. 43 CFR 3276.10 - What are the reporting requirements for facility and lease operations involving Federal...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... facility and lease operations involving Federal geothermal resources? 3276.10 Section 3276.10 Public Lands... INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Reports: Utilization Operations § 3276.10 What are the reporting requirements for facility and lease operations involving Federal...

  15. 43 CFR 3276.10 - What are the reporting requirements for facility and lease operations involving Federal...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... facility and lease operations involving Federal geothermal resources? 3276.10 Section 3276.10 Public Lands... INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Reports: Utilization Operations § 3276.10 What are the reporting requirements for facility and lease operations involving Federal...

  16. 43 CFR 3276.10 - What are the reporting requirements for facility and lease operations involving Federal...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... facility and lease operations involving Federal geothermal resources? 3276.10 Section 3276.10 Public Lands... INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Reports: Utilization Operations § 3276.10 What are the reporting requirements for facility and lease operations involving Federal...

  17. 43 CFR 3276.10 - What are the reporting requirements for facility and lease operations involving Federal...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... facility and lease operations involving Federal geothermal resources? 3276.10 Section 3276.10 Public Lands... INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Reports: Utilization Operations § 3276.10 What are the reporting requirements for facility and lease operations involving Federal...

  18. Solar production of industrial process hot water: Operation and evaluation of the Campbell Soup hot water solar facility

    NASA Astrophysics Data System (ADS)

    Kull, J. I.; Neimeyer, W. N.; Youngblood, S. B.

    1980-12-01

    The operation and evaluation of a solar hot water facility is summarized. The period of evaluation was for 12 months from October 1979 through September 1980. The objective of the work was to obtain additional, long term data on the operation and performance of the facility. Minor modifications to the facility were completed. The system was operated for 15 months, and 12 months of detailed data were evaluated. The facility was available for operation and of the time during the last 8 months of evaluation. A detailed description of the solar facility and of the operating experience is given, and a summary of system performance for the 12 month operation/evaluation period is presented. Recommendations for large scale solar facilities based on this project's experience are given, and an environmental impact assessment is provided.

  19. Railroad safety program, volume 1

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Since 1981, the Federal Railroad Administration (FRA) has annually prepared a National Inspection Plan (NIP) whose purpose is to summarize regional efforts to improve railroad transportation safety. The research concluded on the following tasks including the problems, conclusions and recommendations associated with these tasks is summarized: (1) the preparation of the 1983 NIP, with recommended procedures for improving future NIPs; (2) the development of an outline for the 1984 NIP, including a methodology for the allocation of inspection resources and other specialized regional activities; (3) the management and development of the 1984 NIP; and (4) the development of an instruction manual to be used in the preparation of future NIPs.

  20. 77 FR 14441 - Facility Operating License Amendment From Southern Nuclear Operating, Inc., Joseph M. Farley...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ... Licensing Branch 2-1, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation, U.S... Operating Reactor Licensing, Office of Nuclear Reactor Regulation. BILLING CODE 7590-01-P ... From the Federal Register Online via the Government Publishing Office NUCLEAR...

  1. 78 FR 62940 - Railroad Revenue Adequacy-2012 Determination

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... Surface Transportation Board Railroad Revenue Adequacy--2012 Determination AGENCY: Surface Transportation... announcing the 2012 revenue adequacy determinations for the Nation's Class I railroads. Two carriers, Norfolk Southern Combined Railroad Subsidiaries and Union Pacific Railroad Company, were found to be...

  2. 75 FR 27053 - Railroad Safety Advisory Committee; Charter Renewal

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-13

    ... Federal Railroad Administration Railroad Safety Advisory Committee; Charter Renewal AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of Charter Renewal of the Railroad Safety Advisory Committee (RSAC). SUMMARY: FRA announces the charter renewal of...

  3. 75 FR 3959 - Railroad Safety Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-25

    ... TRANSPORTATION Federal Railroad Administration Railroad Safety Advisory Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of Railroad Safety Advisory Committee (RSAC) Meeting. SUMMARY: FRA announces the forty-first meeting of...

  4. 77 FR 28421 - Railroad Safety Advisory Committee; Charter Renewal

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-14

    ... Federal Railroad Administration Railroad Safety Advisory Committee; Charter Renewal AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of Charter Renewal of the Railroad Safety Advisory Committee (RSAC). SUMMARY: FRA announces the charter renewal of...

  5. Meeting the challenges of bringing a new base facility operation model to Gemini Observatory

    NASA Astrophysics Data System (ADS)

    Nitta, Atsuko; Arriagada, Gustavo; Adamson, A. J.; Cordova, Martin; Nunez, Arturo; Serio, Andrew; Kleinman, Scot

    2016-08-01

    The aim of the Gemini Observatory's Base Facilities Project is to provide the capabilities to perform routine night time operations with both telescopes and their instruments from their respective base facilities without anyone present at the summit. Tightening budget constraints prompted this project as both a means to save money and an opportunity to move toward increasing remote operations in the future. We successfully moved Gemini North nighttime operation to our base facility in Hawaii in Nov., 2015. This is the first 8mclass telescope to completely move night time operations to base facility. We are currently working on implementing BFO to Gemini South. Key challenges for this project include: (1) This is a schedule driven project. We have to implement the new capabilities by the end of 2015 for Gemini North and end of 2016 for Gemini South. (2) The resources are limited and shared with operations which has the higher priority than our project. (3) Managing parallel work within the project. (4) Testing, commissioning and introducing new tools to operational systems without adding significant disruptions to nightly operations. (5) Staff buying to the new operational model. (6) The staff involved in the project are spread on two locations separated by 10,000km, seven time zones away from each other. To overcome these challenges, we applied two principles: "Bare Minimum" and "Gradual Descent". As a result, we successfully completed the project ahead of schedule at Gemini North Telescope. I will discuss how we managed the cultural and human aspects of the project through these concepts. The other management aspects will be presented by Gustavo Arriagada [2], the Project Manager of this project. For technical details, please see presentations from Andrew Serio [3] and Martin Cordova [4].

  6. CVD Diamond Detector Stability Issues for Operation at the National Ignition Facility

    SciTech Connect

    Schmid, G J; Koch, J A; Moran, M J; Lerche, R A; Izumi, N; Phillips, T W; Glebov, V Y; Sangster, T C; Stoeckl, C

    2003-08-22

    Synthetic diamond crystals produced by the Chemical Vapor Deposition (CVD) technique can serve as fast, radiation hard, neutron sensors for the National Ignition Facility (NIF). Here we explore the stability issues, such as charge trapping and high-flux saturation, that will be relevant to operation at the NIF.

  7. 78 FR 44167 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Background Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the...

  8. 77 FR 22808 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-17

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Background Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the ...

  9. A Brief Study of Cafeteria Facilities and Operations, with Recommendations for Implementation.

    ERIC Educational Resources Information Center

    Okamura, James T.

    The facilities and operations of the school lunch program in the public schools of Hawaii are reviewed. Several types of school lunch programs are described including--(1) traditional school lunch programs, (2) kitchen and classroom dining, (3) central and decentralized dining, (4) home school-feeder school system, (5) central kitchen, and (6) the…

  10. 77 FR 48556 - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-14

    ... COMMISSION Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving... purpose of the adjudicatory filings and would constitute a Fair Use application, participants are...)(i)-(viii). For further details with respect to this amendment action, see the application for...

  11. 33 CFR 208.10 - Local flood protection works; maintenance and operation of structures and facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Local flood protection works... CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.10 Local flood protection works; maintenance and operation of structures and facilities. (a) General. (1...

  12. Operation, Maintenance and Management of Wastewater Treatment Facilities: A Bibliography of Technical Documents.

    ERIC Educational Resources Information Center

    Himes, Dottie

    This is an annotated bibliography of wastewater treatment manuals. Fourteen manuals are abstracted including: (1) A Planned Maintenance Management System for Municipal Wastewater Treatment Plants; (2) Anaerobic Sludge Digestion, Operations Manual; (3) Emergency Planning for Municipal Wastewater Treatment Facilities; (4) Estimating Laboratory Needs…

  13. 14 CFR 121.99 - Communications facilities-domestic and flag operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Communications facilities-domestic and flag operations. 121.99 Section 121.99 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... system must be able to provide immediate satellite-based voice communications of...

  14. 76 FR 31369 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations Addresses: Please include Docket ID NRC-2011-0117 in the subject line of your comments. Comments submitted in writing or...

  15. 39 CFR 241.3 - Discontinuance of USPS-operated retail facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... respect to discontinuance actions for which initial feasibility studies have been initiated on or after... prior to July 14, 2011 shall apply to discontinuance actions for which initial feasibility studies have... President, or a designee of either, may initiate a feasibility study of a USPS-operated facility...

  16. Laser Ion Source Operation at the TRIUMF Radioactive Ion Beam Facility

    SciTech Connect

    Lassen, J.; Bricault, P.; Dombsky, M.; Lavoie, J. P.; Gillner, M.; Hellbusch, F.; Teigelhoefer, A.; Voss, A.; Gottwald, T.; Wendt, K. D. A.

    2009-03-17

    The TRIUMF Resonant Ionization Laser Ion Source (RILIS) for radioactive ion beam production is presented, with target ion source, laser beam transport, laser system and operation. In this context aspects of titanium sapphire (TiSa) laser based RILIS and facility requirements are discussed and results from the first years of TRILIS RIB delivery are given.

  17. 48 CFR 246.270 - Safety of facilities, infrastructure, and equipment for military operations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Safety of facilities, infrastructure, and equipment for military operations. 246.270 Section 246.270 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT QUALITY...

  18. 77 FR 31655 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-29

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Background Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the...

  19. 75 FR 68629 - Massachusetts Institute of Technology Reactor Notice of Issuance of Renewed Facility Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-08

    ...-reflected research reactor licensed to operate at a steady-state power level of 6 megawatts thermal power..., Research and Test Reactors Licensing Branch, Division of Policy and Rulemaking, Office of Nuclear Reactor... COMMISSION Massachusetts Institute of Technology Reactor Notice of Issuance of Renewed Facility...

  20. 75 FR 19428 - Palisades Nuclear Plant; Notice of Consideration of Issuance of Amendment to Facility Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-14

    ... COMMISSION Palisades Nuclear Plant; Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing The U... significant hazards consideration. Under the Commission's regulations in Title 10 of the Code of...

  1. 75 FR 33839 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-15

    ... Significant Hazards Considerations I. Background Pursuant to section 189a. (2) of the Atomic Energy Act of... involves no significant hazards consideration, notwithstanding the pendency before the Commission of a..., 2010 (75 FR 30440). Notice of Consideration of Issuance of Amendments to Facility Operating...

  2. 7 CFR 70.110 - Requirements for sanitation, facilities, and operating procedures in official plants.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... PRODUCTS INSPECTION ACT (CONTINUED) VOLUNTARY GRADING OF POULTRY PRODUCTS AND RABBIT PRODUCTS Grading of Poultry Products and Rabbit Products Sanitary Requirements, Facilities, and Operating Procedures § 70.110... in 9 CFR part 381 for poultry, and for rabbits the requirements shall be the applicable provisions...

  3. University of Washington Clinical Neutron Facility: Report on 26 Years of Operation

    SciTech Connect

    Laramore, George E.; Emery, Robert; Reid, David; Banerian, Stefani; Kalet, Ira; Jacky, Jonathan; Risler, Ruedi

    2011-12-13

    Particle radiotherapy facilities are highly capital intensive and must operate over decades to recoup the original investment. We describe the successful, long-term operation of a neutron radiotherapy center at the University of Washington, which has been operating continuously since September 1984. To date, 2836 patients have received neutron radiotherapy. The mission of the facility has also evolved to include the production of unique radioisotopes that cannot be made with the low-energy cyclotrons more commonly found in nuclear medicine departments. The facility is also used for neutron damage testing for industrial devices. In this paper, we describe the challenges of operating such a facility over an extended time period, including a planned maintenance and upgrade program serving diverse user groups, and summarize the major clinical results in terms of tumor control and normal tissue toxicity. Over time, the mix of patients being treated has shifted from common tumors such as prostate cancer, lung cancer, and squamous cell tumors of the head and neck to the rarer tumors such as salivary gland tumors and sarcomas due to the results of clinical trials. Current indications for neutron radiotherapy are described and neutron tolerance doses for a range of normal tissues presented.

  4. University of Washington Clinical Neutron Facility: Report on 26 Years of Operation

    NASA Astrophysics Data System (ADS)

    Laramore, George E.; Emery, Robert; Reid, David; Banerian, Stefani; Kalet, Ira; Jacky, Jonathan; Risler, Ruedi

    2011-12-01

    Particle radiotherapy facilities are highly capital intensive and must operate over decades to recoup the original investment. We describe the successful, long-term operation of a neutron radiotherapy center at the University of Washington, which has been operating continuously since September 1984. To date, 2836 patients have received neutron radiotherapy. The mission of the facility has also evolved to include the production of unique radioisotopes that cannot be made with the low-energy cyclotrons more commonly found in nuclear medicine departments. The facility is also used for neutron damage testing for industrial devices. In this paper, we describe the challenges of operating such a facility over an extended time period, including a planned maintenance and upgrade program serving diverse user groups, and summarize the major clinical results in terms of tumor control and normal tissue toxicity. Over time, the mix of patients being treated has shifted from common tumors such as prostate cancer, lung cancer, and squamous cell tumors of the head and neck to the rarer tumors such as salivary gland tumors and sarcomas due to the results of clinical trials. Current indications for neutron radiotherapy are described and neutron tolerance doses for a range of normal tissues presented.

  5. 43 CFR 3275.13 - How must the facility operator measure the geothermal resources?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... geothermal resources? 3275.13 Section 3275.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL... geothermal resources? The facility operator must: (a) Measure all production, injection and utilization...

  6. 43 CFR 3275.13 - How must the facility operator measure the geothermal resources?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... geothermal resources? 3275.13 Section 3275.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL... geothermal resources? The facility operator must: (a) Measure all production, injection and utilization...

  7. 43 CFR 3275.13 - How must the facility operator measure the geothermal resources?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... geothermal resources? 3275.13 Section 3275.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL... geothermal resources? The facility operator must: (a) Measure all production, injection and utilization...

  8. 43 CFR 3275.13 - How must the facility operator measure the geothermal resources?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... geothermal resources? 3275.13 Section 3275.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL... geothermal resources? The facility operator must: (a) Measure all production, injection and utilization...

  9. Operation and Performance Measurement on Engines in Sea Level Test Facilities

    DTIC Science & Technology

    1984-03-01

    operations which may ho performed in order to imorove a % signal ci, change its existing form into another one for the purpose of electrical comnatibility ...facility that allows realistic gas turbine core engine cyclic testing with fully instrumented components. This corporate funded Low Cycle Fatigue

  10. Safety analysis of the Los Alamos critical experiments facility: burst operation of Skua

    SciTech Connect

    Orndoff, J.D.; Paxton, H.C.; Wimett, T.F.

    1980-12-01

    Detailed consideration of the Skua burst assembly is provided, thereby supplementing the facility Safety Analysis Report covering the operation of other critical assemblies at the Los Alamos Scientific Laboratory. As with these assemblies the small fission-product inventory, ambient pressure, and moderate temperatures in Skua are amenable to straightforward measures to ensure the protection of the public.

  11. 75 FR 67143 - Notice of Withdrawal of Application for Amendment to Facility Operating License

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-01

    .... (Pilgrim Nuclear Power Station). Entergy Nuclear Indian Point 2, LLC Docket Nos. 50-003, 50-247, and 72-51..., 2008. (Pilgrim Nuclear Power Station). License. Entergy Nuclear Vermont Yankee, LLC. Facility Operating.... Entergy Nuclear Generation Company Revise FOL & TS Pages 1, 4.0-1, and (Pilgrim Nuclear Power Station...

  12. 7 CFR 319.40-8 - Processing at facilities operating under compliance agreements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 5 2014-01-01 2014-01-01 false Processing at facilities operating under compliance agreements. 319.40-8 Section 319.40-8 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FOREIGN QUARANTINE NOTICES...

  13. 7 CFR 319.40-8 - Processing at facilities operating under compliance agreements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 5 2011-01-01 2011-01-01 false Processing at facilities operating under compliance agreements. 319.40-8 Section 319.40-8 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FOREIGN QUARANTINE NOTICES...

  14. 7 CFR 319.40-8 - Processing at facilities operating under compliance agreements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 5 2013-01-01 2013-01-01 false Processing at facilities operating under compliance agreements. 319.40-8 Section 319.40-8 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FOREIGN QUARANTINE NOTICES...

  15. 7 CFR 319.40-8 - Processing at facilities operating under compliance agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Processing at facilities operating under compliance agreements. 319.40-8 Section 319.40-8 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FOREIGN QUARANTINE NOTICES...

  16. What Went Wrong? Maintenance and Operation Errors to Avoid in Educational Facility Planning.

    ERIC Educational Resources Information Center

    Council of Educational Facility Planners, Columbus, OH.

    Area-by-area discussions of the components of new educational buildings and the problems that can occur once a building is in use are presented. Methods to be used in avoiding future maintenance and operation troubles are also included. Emphasized throughout is the responsibility of the educational facility planner to learn as much as he can about…

  17. 75 FR 62592 - Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ... amendments to the Renewed Facility Operating Licenses include: (1) The proposed Cyber Security Plan for CCNPP... implement and maintain in effect all provisions of the Nuclear Regulatory Commission-approved Cyber Security... cyber security program. This regulation specifically requires each licensee currently licensed to...

  18. A knowledge acquisition process to analyse operational problems in solid waste management facilities.

    PubMed

    Dokas, Ioannis M; Panagiotakopoulos, Demetrios C

    2006-08-01

    The available expertise on managing and operating solid waste management (SWM) facilities varies among countries and among types of facilities. Few experts are willing to record their experience, while few researchers systematically investigate the chains of events that could trigger operational failures in a facility; expertise acquisition and dissemination, in SWM, is neither popular nor easy, despite the great need for it. This paper presents a knowledge acquisition process aimed at capturing, codifying and expanding reliable expertise and propagating it to non-experts. The knowledge engineer (KE), the person performing the acquisition, must identify the events (or causes) that could trigger a failure, determine whether a specific event could trigger more than one failure, and establish how various events are related among themselves and how they are linked to specific operational problems. The proposed process, which utilizes logic diagrams (fault trees) widely used in system safety and reliability analyses, was used for the analysis of 24 common landfill operational problems. The acquired knowledge led to the development of a web-based expert system (Landfill Operation Management Advisor, http://loma.civil.duth.gr), which estimates the occurrence possibility of operational problems, provides advice and suggests solutions.

  19. 78 FR 23633 - Union Pacific Railroad Company-Trackage Rights Exemption-Illinois Central Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... Surface Transportation Board Union Pacific Railroad Company--Trackage Rights Exemption-- Illinois Central Railroad Company Illinois Central Railroad Company (IC), pursuant to a written agreement dated December 18, 2012, has agreed to grant overhead trackage rights to Union Pacific Railroad Company (UP) over...

  20. 76 FR 34805 - Arkansas Midland Railroad Company, Inc., Trackage Rights Exemption; Caddo Valley Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... Surface Transportation Board Arkansas Midland Railroad Company, Inc., Trackage Rights Exemption; Caddo Valley Railroad Company Pursuant to a written trackage rights agreement, Caddo Valley Railroad Company (CVR) has agreed to grant local trackage rights to Arkansas Midland Railroad Company, Inc. (AKMD)...