Water Management Models in Practice: A Case Study of the Aswan High Dam
NASA Astrophysics Data System (ADS)
El-Ashry, M. T.; Alford, D. L.
1984-04-01
The stated purpose of this volume is the development and evaluation of operating policies for the Aswan High Dam and their relation to the development of water resources policy in Egypt. That objective is admirably fulfilled through discussions of water use in Egypt and the operation objectives of the High Dam, the behavior of the physical system and simulation of the reservoir, a realtime management model of the dam, management of water shortages and trade-offs between major uses, and coordinated operation of the dam with new upstream as well as downstream developments.The High Dam has been a source of controversy, particularly with regard to its environmental impacts. Its adverse effects include changes in the water table and attendant salt buildup in irrigated areas, excessive growth of aquatic plants below the dam, shoreline erosion, and increases in water-borne diseases such as schistosomiasis (bilharzia). The dam was intended to offset rapid population growth by increasing food supplies through the transformation of irrigated land in southern Egypt from seasonal to perennial cultivation and by providing water for the reclamation of desert land. Unfortunately, such benefits have been outstripped by the rapidly growing population, and water shortages will be experienced by the end of the century.
Recent sediment studies refute Glen Canyon Dam hypothesis
Rubin, David M.; Topping, David J.; Schmidt, John C.; Hazel, Joe; Kaplinski, Matt; Melis, Theodore S.
2002-01-01
Recent studies of sedimentology hydrology, and geomorphology indicate that releases from Glen Canyon Dam are continuing to erode sandbars and beaches in the Colorado River in Grand Canyon National Park, despite attempts to restore these resources. The current strategy for dam operations is based on the hypothesis that sand supplied by tributaries of the Colorado River downstream from the dam will accumulate in the channel during normal dam operations and remain available for restoration floods. Recent work has shown that this hypothesis is false, and that tributary sand inputs are exported downstream rapidly typically within weeks or months under the current flow regime.
Application of the SHOALS survey system to fisheries investigations in the Columbia River
Tiffan, Kenneth F.; Wagner, Paul G.; Wolf, Keith S.; Hoffarth , Paul A.
2009-01-01
We used a Scanning Hydrographic Operational Airborne LiDAR (Light Detection and Ranging) Survey (SHOALS) system to collect high-resolution bathymetry for 33 km of the Hanford Reach. Data were used in conjunction with hydrodynamic and predictive habitat models within a GIS (Geographical Information System) framework to evaluate the effects of a varying hydrograph on juvenile fall Chinook salmon rearing habitat and risk from stranding and entrapment. Furthermore, we were able to estimate the number of juvenile fish that were stranded and entrapped in pools when operations at Priest Rapids Dam caused rapid decreases in river flows. Our findings were ultimately used to estimate impacts of power generation operations at Priest Rapids Dam and develop long-term policy and operational guidelines to protect juvenile fall Chinook salmon during the spring rearing period.
Wehmeyer, Loren L.; Wagner, Chad R.
2011-01-01
The relation between dam releases and dissolved-oxygen concentration, saturation and deficit, downstream from Roanoke Rapids Dam in North Carolina was evaluated from 2005 to 2009. Dissolved-oxygen data collected at four water-quality monitoring stations downstream from Roanoke Rapids Dam were used to determine if any statistical relations or discernible quantitative or qualitative patterns linked Roanoke River in-stream dissolved-oxygen levels to hydropower peaking at Roanoke Rapids Dam. Unregulated tributaries that inundate and drain portions of the Roanoke River flood plain are crucial in relation to in-stream dissolved oxygen. Hydropower peaking from 2005 to 2009 both inundated and drained portions of the flood plain independently of large storms. The effects of these changes in flow on dissolved-oxygen dynamics are difficult to isolate, however, because of (1) the variable travel time for water to move down the 112-mile reach of the Roanoke River from Roanoke Rapids Dam to Jamesville, North Carolina, and (2) the range of in-situ conditions, particularly inundation history and water temperature, in the flood plain. Statistical testing was conducted on the travel-time-adjusted hourly data measured at each of the four water-quality stations between May and November 2005-2009 when the weekly mean flow was 5,000-12,000 cubic feet per second (a range when Roanoke Rapids Dam operations likely affect tributary and flood-plain water levels). Results of this statistical testing indicate that at the 99-percent confidence interval dissolved-oxygen levels downstream from Roanoke Rapids Dam were lower during peaking weeks than during non-peaking weeks in three of the five years and higher in one of the five years; no data were available for weeks with peaking in 2007. For the four years of statistically significant differences in dissolved oxygen between peaking and non-peaking weeks, three of the years had statistically signficant differences in water temperature. Years with higher water temperature during peaking had lower dissolved oxygen during peaking. Only 2009 had no constistent statistically significant water-temperature difference at all sites, and dissolved-oxygen levels downstream from Roanoke Rapids Dam during peaking weeks that year were lower than during non-peaking weeks. Between 2005 and 2009, daily mean dissolved-oxygen concentrations below the State standard occurred during only 1 of the 17 (6 percent) peaking weeks, with no occurrence of instantaneous dissolved-oxygen concentrations below the State standard. This occurrence was during a 9-day period in July 2005 when the daily maximum air temperatures approached or exceeded 100 degrees Fahrenheit, and the draining of the flood plains from peaking operations was followed by consecutive days of low flows.
Audit Technical of Kori Rubber Dam in the River of Keyang District of Ponorogo East Java Province
NASA Astrophysics Data System (ADS)
Murnianto, E.; Suprapto, M.; Ikhsan, C.
2018-03-01
The development of science and technology for the utilization and protection of rivers has embodied various types of river infrastructure. Without proper maintenance, rapid river sediments undergo physical degradation and function. Problems that occur in Kori Rubber Dam, among others, the damage to the body of the rubber dam that is made of rubber, so that the function of flower deflection is not optimal. This happens because of limited operational and maintenance activities (OM). A technical audit is a process of identifying problems, analyzing, and evaluating ones conducted independently, objectively and professionally on the basis of examination, to assess the truth, accuracy, credibility, and reliability of information about a job. In this case an assessment of the Kori Rubber Dam, which is basically a benchmarking activity. Assessment of rubber dam components includes the physical conditions and functions that affect the weir. This research is expected to know the performance of Kori rubber Dam as a recommendation material in the implementation of OM Rubber Dam activities.
Milillo, Pietro; Bürgmann, Roland; Lundgren, Paul; Salzer, Jacqueline; Perissin, Daniele; Fielding, Eric; Biondi, Filippo; Milillo, Giovanni
2016-12-06
We present a detailed survey of the ongoing destabilization process of the Mosul dam. The dam is located on the Tigris river and is the biggest hydraulic structure in Iraq. From a geological point of view the dam foundation is poor due to a site geology formed by alternating strata of highly soluble materials including gypsum, anhydrite, marl and limestone. Here we present the first multi-sensor cumulative deformation map for the dam generated from space-based interferometric synthetic aperture radar measurements from the Italian constellation COSMO-SkyMed and the European sensor Sentinel-1a over the period 2014-2016 that we compare to an older dataset spanning 2004-2010 acquired with the European Envisat satellite. We found that deformation was rapid during 2004-2010, slowed in 2012-2014 and increased since August 2014 when grouting operations stopped due to the temporary capture of the dam by the self proclaimed Islamic State. We model the inferred deformation using a Markov chain Monte Carlo approach to solve for change in volume for simple tensile dislocations. Results from recent and historical geodetic datasets suggests that the volume dissolution rate remains constant when the equivalent volume of total concrete injected during re-grouting operations is included in the calculations.
Milillo, Pietro; Bürgmann, Roland; Lundgren, Paul; Salzer, Jacqueline; Perissin, Daniele; Fielding, Eric; Biondi, Filippo; Milillo, Giovanni
2016-01-01
We present a detailed survey of the ongoing destabilization process of the Mosul dam. The dam is located on the Tigris river and is the biggest hydraulic structure in Iraq. From a geological point of view the dam foundation is poor due to a site geology formed by alternating strata of highly soluble materials including gypsum, anhydrite, marl and limestone. Here we present the first multi-sensor cumulative deformation map for the dam generated from space-based interferometric synthetic aperture radar measurements from the Italian constellation COSMO-SkyMed and the European sensor Sentinel-1a over the period 2014–2016 that we compare to an older dataset spanning 2004–2010 acquired with the European Envisat satellite. We found that deformation was rapid during 2004–2010, slowed in 2012–2014 and increased since August 2014 when grouting operations stopped due to the temporary capture of the dam by the self proclaimed Islamic State. We model the inferred deformation using a Markov chain Monte Carlo approach to solve for change in volume for simple tensile dislocations. Results from recent and historical geodetic datasets suggests that the volume dissolution rate remains constant when the equivalent volume of total concrete injected during re-grouting operations is included in the calculations. PMID:27922128
NASA Astrophysics Data System (ADS)
Milillo, Pietro; Bürgmann, Roland; Lundgren, Paul; Salzer, Jacqueline; Perissin, Daniele; Fielding, Eric; Biondi, Filippo; Milillo, Giovanni
2016-12-01
We present a detailed survey of the ongoing destabilization process of the Mosul dam. The dam is located on the Tigris river and is the biggest hydraulic structure in Iraq. From a geological point of view the dam foundation is poor due to a site geology formed by alternating strata of highly soluble materials including gypsum, anhydrite, marl and limestone. Here we present the first multi-sensor cumulative deformation map for the dam generated from space-based interferometric synthetic aperture radar measurements from the Italian constellation COSMO-SkyMed and the European sensor Sentinel-1a over the period 2014-2016 that we compare to an older dataset spanning 2004-2010 acquired with the European Envisat satellite. We found that deformation was rapid during 2004-2010, slowed in 2012-2014 and increased since August 2014 when grouting operations stopped due to the temporary capture of the dam by the self proclaimed Islamic State. We model the inferred deformation using a Markov chain Monte Carlo approach to solve for change in volume for simple tensile dislocations. Results from recent and historical geodetic datasets suggests that the volume dissolution rate remains constant when the equivalent volume of total concrete injected during re-grouting operations is included in the calculations.
NASA Astrophysics Data System (ADS)
Piman, T.; Cochrane, T. A.; Arias, M. E.
2013-12-01
Water flow patterns in the Mekong River and its tributaries are changing due to water resources development, particularly as a result of on-going rapid hydropower development of tributaries for economic growth. Local communities and international observers are concerned that alterations of natural flow patterns will have great impacts on biodiversity, ecosystem services, food securing and livelihood in the basin. There is also concern that un-coordinated dam development will have an adverse impact on energy production potential of individual hydropower plants. Of immediate concern is the proposed hydropower development in the transboundary Srepok, Sesan and Srekong (3S) Basin, which contributes up to 20% of the Mekong's annual flows, has a large potential for energy production, and provides critical ecosystem services to local people and the downstream Tonle Sap Lake and the Mekong delta. To assess the magnitude of potential changes in flows and hydropower production, daily flows were simulated over 20 years (1986-2005) using the SWAT and HEC ResSim models for a range of dam development and operations scenarios. Simulations of all current and proposed hydropower development in the 3S basin (41 dams) using an operation scheme to maximize electricity production will increase average dry seasonal flows by 88.1% while average wet seasonal flows decrease by 24.7% when compared to the baseline (no dams) scenario, About 55% of dry season flows changes are caused by the seven largest proposed dams (Lower Srepok 3, Lower Srepok4, Lower Sesan 3, Lower Sesan and Srepok 2, Xekong 5, Xekong 4, and Xe Xou). The total active storage of the existing and ongoing hydropower projects is only 6,616 million m3 while the cumulative active storage of the seven large proposed dams is 17,679 million m3. The Lower Srepok 3 project causes the highest impact on seasonal flow changes. Average energy production of the existing and ongoing hydropower projects is 73.2 GWh/day. Additional benefits from energy production of the seven large proposed dams (33.0 GWh/day) are less than half compared to the cumulative benefits of the exiting and ongoing projects. In total, potential energy production of all dams is 129.1 GWh/day. Cascade dam simulations, under an independent operation regime, result in high electricity production of downstream dams, particularly of small storage dams. Hourly flow alterations, however, can be significant due to intra daily reservoir operations and warrant further study as well as impact of climate change on flows and hydropower operation. Strategic site selection and coordinated reservoir operations between countries and dam operators are necessary to achieve an acceptable level of energy production in the basin and mitigate negative impacts to seasonal flow patterns which sustain downstream ecosystem productivity and livelihoods.
DEVELOPMENT OF THE PRIEST RAPIDS TURBINE UPGRADE PROJECT
DOE Office of Scientific and Technical Information (OSTI.GOV)
DeBolt, Donald; Richmond, Marshall C.; Donelson, Richard K.
The Priest Rapids Dam is located on the Columbia River and is operated by Public Utility District No. 2 of Grant County, WA (GCPUD). In operation since 1959, GCPUD decided that a major upgrade was necessary. As with other hydroelectric facilities on the Columbia River, improving fish passage at Priest Rapids Dam is of great importance for salmon and steelhead populations in the Pacific Northwest. Consequently, GCPUD established the Priest Rapids Turbine Upgrade Project to extend the life of the units, increase efficiency and power production, and improve fish-passage. The Priest Rapids powerhouse is equipped with 10 vertical Kaplan turbinesmore » with runner diameters of 7.21 m operating under net heads varying from 18 m to 27 m. The scope of the project included a design competition involving three turbine manufacturers providing up to two designs for evaluation. Selection of the replacement design was determined by the lowest evaluated price based on model test results conducted at an independent laboratory (Ecole Polytechnique Federale de Lausanne in Lausanne Switzerland) and a biological performance score determined by a newly developed Biological Performance Assessment (BioPA) performed by Pacific Northwest National Laboratory in Richland, WA. In the paper, the hydraulic design challenges are reviewed, in addition to comparisons of designs evaluated during the competitive model test program and biological assessment. The paper also provides a description of the process followed by GCPUD, and how the evaluation criteria influenced the development and the finally selected solution.« less
Wehmeyer, Loren L.; Bales, Jerad D.
2009-01-01
Understanding the relation between dam release characteristics and downstream water quality in the lower Roanoke River, North Carolina, is important for natural-resource management and ecosystem protection. Data from four raingages, four water-quality monitoring sites, and one streamflow-measurement site were used to identify statistical relations and discernible quantitative or qualitative patterns linking Roanoke River instream dissolved-oxygen (DO) levels to releases at Roanoke Rapids Dam for the period 1998-2005. The time-series DO data, complicated by the occurrence of major hurricanes in the short period of hourly DO data collection at the dam, present a mixed picture of the effects of hydropower peaking (a technique used by hydropower dam operators to produce electricity when consumption is high by passing a large volume of water through the dam turbines, which dramatically increases the volume of flow below the dam) on downstream DO. Other than in 2003 when dissolved-oxygen concentrations in the Roanoke River were likely affected by runoff from Hurricane Isabel rains, there were not consistent, statistically significant differences detected in the annual medians of hourly and(or) daily DO values during peaking versus nonpeaking periods. Along the Roanoke River, downstream of Roanoke Rapids Dam at Oak City, North Carolina, using a 95-percent confidence interval, the median value of the May-November daily mean DO concentrations for each year was lower during peaking periods for 2 years, higher for 2 years, and not significantly different for 4 years. Downstream at Jamesville, North Carolina, also using a 95-percent confidence interval, the median value of the annual May-November daily mean DO concentrations during hydropower peaking was lower for 4 years, higher for 2 years, and not significantly different for 2 years. In summary, the effect of hydropower peaking on downstream DO was inconsistent. Conversely, large precipitation events downstream from the dam resulted in consistent, statistically significant decreases in DO in the mainstem of the Roanoke River at Oak City and Jamesville.
Schenk, Liam N.; Bragg, Heather M.
2014-01-01
The drawdown of Fall Creek Lake resulted in the net transport of approximately 50,300 tons of sediment from the lake during a 6-day drawdown operation, based on computed daily values of suspended-sediment load downstream of Fall Creek Dam and the two main tributaries to Fall Creek Lake. A suspended-sediment budget calculated for 72 days of the study period indicates that as a result of drawdown operations, there was approximately 16,300 tons of sediment deposition within the reaches of Fall Creek and the Middle Fork Willamette River between Fall Creek Dam and the streamgage on the Middle Fork Willamette River at Jasper, Oregon. Bedload samples collected at the station downstream of Fall Creek Dam during the drawdown were primarily composed of medium to fine sands and accounted for an average of 11 percent of the total instantaneous sediment load (also termed sediment discharge) during sample collection. Monitoring of dissolved oxygen at the station downstream of Fall Creek Dam showed an initial decrease in dissolved oxygen concurrent with the sediment release over the span of 5 hours, though the extent of dissolved oxygen depletion is unknown because of extreme and rapid fouling of the probe by the large amount of sediment in transport. Dissolved oxygen returned to background levels downstream of Fall Creek Dam on December 18, 2012, approximately 1 day after the end of the drawdown operation.
Anderson, Elizabeth P.; Pringle, Catherine M.; Freeman, Mary C.
2008-01-01
Costa Rica has recently experienced a rapid proliferation of dams for hydropower on rivers draining its northern Caribbean slope. In the Sarapiquí River Basin, eight hydropower plants were built between 1990 and 1999 and more projects are either under construction or proposed. The majority of these dams are small (<15 m tall) and operate as water diversion projects.While the potential environmental effects of individual projects are evaluated prior to dam construction, there is a need for consideration of the basin-scale ecological consequences of hydropower development. This study was a first attempt to quantify the extent of river fragmentation by dams in the Sarapiquí River Basin.Using simple spatial analyses, the length of river upstream from dams and the length of de-watered reaches downstream from dams was measured. Results indicated that there are currently 306.8 km of river (9.4% of the network) upstream from eight existing dams in the Sarapiquí River Basin and 30.6 km of rivers (0.9% of the network) with significantly reduced flow downstream from dams. Rivers upstream from dams primarily drain two life zones: Premontane Rain Forest (107.9 km) and Lower Montane Rain Forest (168.2 km).Simple spatial analyses can be used as a predictive or planning tool for considering the effects of future dams in a basin-scale context. In the Sarapiquí River Basin, we recommend that future dam projects be constructed on already dammed rivers to minimize additional river fragmentation and to protect remaining riverine connectivity.
NASA Astrophysics Data System (ADS)
Bountry, J.; Godaire, J.; Bradley, D. N.
2017-12-01
At the terminus of the Truckee River into Pyramid Lake (Nevada, USA), upstream river management actions have dramatically reshaped the river landscape, posing significant challenges for the management of endangered aquatic species and maintenance of existing infrastructure. Within the last 100 years, upstream water withdrawal for human uses has resulted in a rapid lowering of Pyramid Lake which initiated up to 90 ft of channel incision. In 1976 Marble Bluff Dam was constructed to halt the upstream progression of channel incision and protect upstream agricultural lands, tribal resources, and infrastructure. Since construction an additional 40 ft of lake lowering and subsequent channel lowering now poses a potential risk to the structural integrity of the dam. The dynamic downstream river combined with ongoing reservoir sedimentation pose challenges to fish passage facilities that enable migration of numerous endangered cui-ui and threatened Lahontan Cutthroat Trout (LCT) to upstream spawning areas each year. These facilities include a fish lock at the dam, a fish bypass channel which allows fish to avoid the shallow delta area during low lake levels, and a meandering channel constructed by the Nature Conservancy to connect the bypass channel to the receding Pyramid Lake. The reservoir formed by Marble Bluff Dam has completely filled with sediment which impacts fish passage facilities. The original operating manual for the dam recommends year-round flushing of sediment through radial gates, but this can no longer be accomplished. During critical fish migration periods in the spring operators must ensure fish entrance channels downstream of the dam are not buried with released sediment and fish are not trapped in a portion of the reservoir full of sediment that would risk sending them back over the dam. To help inform future reservoir sediment and infrastructure management strategies, we bracket a range of potential river responses to lake level lowering and floods using historical trends, current field data, and hydraulic and sediment transport models. We present options for adaptive management for dam and reservoir sediment operations that incorporates monitoring of river processes to inform annual implementation strategies along with long-term planning.
Perchlorate as a Ground-Water Tracer Along the Lower Colorado River
NASA Astrophysics Data System (ADS)
Justet, L.; Lico, M. S.
2008-12-01
Anthropogenic perchlorate was first observed in the lower Colorado River (NV and AZ) in 1997. The perchlorate source was traced upstream from Hoover Dam and Lake Mead to Las Vegas Wash. Perchlorate migrated through the local surface- and ground-water systems to the Wash from nearby manufacturing facilities in Henderson, NV, which had been operating since the 1940s. The Nevada Division of Environmental Protection (NDEP) began monitoring perchlorate in the lower Colorado River at Willow Beach, located about 18 km south of the Dam, in 1997. A 3 μg/L reduction was observed at Willow Beach in 2003-2004, coincident with remediation at the Henderson site in 1999-2004. This observed decrease indicates that the effects of remediation rapidly propagated through the surface-water system below the Dam. In July 2008 water samples were collected and analyzed for perchlorate from eight springs along the lower Colorado River below Hoover Dam, from a discharge tunnel in the country rock at Hoover Dam, and from Lake Mead (above and below the thermocline). Lake Mead water collected above the thermocline east of Sentinel Island contained 3.9 μg/L perchlorate, while water below the thermocline contained 1.8 μg/L. Perchlorate concentrations were lower than the 2 to 4 μg/L quantitation limit for the six springs located more than 2 km south of the Dam. Samples from Pupfish Springs, about 0.9 km south of the Dam, contained 6.4-6.8 μg/L perchlorate. Water collected from the discharge tunnel in the Dam contained 8.2 μg/L perchlorate. Perchlorate concentrations observed at Pupfish Springs and the discharge tunnel in the Dam in 2008 are similar to those reported downstream at Willow Beach prior to 2003-2004 by NDEP indicating that the ground water travel time from the Dam to Pupfish Springs is between 4 and 70 years and the maximum flow velocities are between about 13-200 m/y. These rapid velocity estimates suggest that faults and fractures in the area are an important control on discharge points in the vicinity of the Dam. The presence of perchlorate at two sites and absence or background concentrations at the other sites indicates the presence of multiple flow paths between the perchlorate source and the springs near the Dam or that the flow paths are more complex than previously thought.
Garcia, Ana Maria
2012-01-01
The Roanoke River is an important natural resource for North Carolina, Virginia, and the Nation. Flood plains of the lower Roanoke River, which extend from Roanoke Rapids Dam to Batchelor Bay near Albemarle Sound, support a large and diverse population of nesting birds, waterfowl, freshwater and anadromous fish, and other wildlife, including threatened and endangered species. The flow regime of the lower Roanoke River is affected by a number of factors, including flood-management operations at the upstream John H. Kerr Dam and Reservoir. A three-dimensional, numerical water-quality model was developed to explore links between upstream flows and downstream water quality, specifically in-stream dissolved-oxygen dynamics. Calibration of the hydrodynamics and dissolved-oxygen concentrations emphasized the effect that flood-plain drainage has on water and oxygen levels, especially at locations more than 40 kilometers away from the Roanoke Rapids Dam. Model hydrodynamics were calibrated at three locations on the lower Roanoke River, yielding coefficients of determination between 0.5 and 0.9. Dissolved-oxygen concentrations were calibrated at the same sites, and coefficients of determination ranged between 0.6 and 0.8. The model has been used to quantify relations among river flow, flood-plain water level, and in-stream dissolved-oxygen concentrations in support of management of operations of the John H. Kerr Dam, which affects overall flows in the lower Roanoke River. Scenarios have been developed to mitigate the negative effects that timing, duration, and extent of flood-plain inundation may have on vegetation, wildlife, and fisheries in the lower Roanoke River corridor. Under specific scenarios, the model predicted that mean dissolved-oxygen concentrations could be increased by 15 percent by flow-release schedules that minimize the drainage of anoxic flood-plain waters. The model provides a tool for water-quality managers that can help identify options that improve water quality and protect the aquatic habitat of the Roanoke River.
Mitigating Dam Impacts Using Environmental Flow Releases
NASA Astrophysics Data System (ADS)
Richter, B. D.
2017-12-01
One of the most ecologically disruptive impacts of dams is their alteration of natural river flow variability. Opportunities exist for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. This presentation will highlight a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the suggested strategies for dam re-operation are predicated on changes in the end-use of the water, such as reductions in urban or agricultural water use during droughts, a systemic perspective of entire water management systems will be required to attain the fullest possible benefits of dam re-operations.
Managing Tradeoffs between Hydropower and the Environment in the Mekong River Basin
NASA Astrophysics Data System (ADS)
Loucks, Daniel P.; Wild, Thomas B.
2015-04-01
Hydropower dams are being designed and constructed at a rapid pace in the Mekong/Lancang River basin in Southeast Asia. These reservoirs are expected to trap significant amounts sediment, decreasing much of the river's capability to transport nutrients and maintain its geomorphology and habitats. We apply a simulation model for identifying and evaluating alternative dam siting, design and operating policy (SDO) options that could help maintain more natural sediment regimes downstream of dams and for evaluating the effect of these sediment-focused SDO strategies on hydropower production and reliability. We apply this approach to the planned reservoirs that would prevent a significant source of sediment from reaching critical Mekong ecosystems such as Cambodia's Tonle Sap Lake and the Mekong delta in Vietnam. Model results suggest that various SDO modifications could increase sediment discharge from this site by 300-450% compared to current plans, but a 30-55% loss in short-term annual energy production depending on various configurations of upstream reservoirs. Simulation results also suggest that sediment management-focused reservoir operating policies could cause ecological damage if they are not properly implemented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rocklage, Stephen J.
The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project (FCAP) sites upstream of Lower Granite Dam in 2003. This was the eighth year of a long-term project to supplement natural spawning populations of Snake River stock fall Chinook salmon upstream of Lower Granite Dam. The 437,633 yearlings released from the Fall Chinook Acclimation Project facilities were short of the 450,000 fish quota.more » We use Passive Integrated Transponder (PIT) tag technology to monitor the primary performance measures of survival to mainstem dams and migration timing. We also monitor size, condition and tag/mark retention at release. We released 7,492 PIT tagged yearlings from Pittsburg Landing, 7,494 from Big Canyon and 2,497 from Captain John Rapids. Fish health sampling indicated that, overall, bacterial kidney disease levels at the acclimation facilities could be considered medium with 37-83% of the fish sampled rating medium to very high. Mean fork lengths (95% confidence interval) of the PIT tagged groups ranged from 153.7 mm (153.2-154.2 mm) at Captain John Rapids to 164.2 mm (163.9-164.5 mm) at Pittsburg Landing. Mean condition factors ranged from 1.06 at Lyons Ferry Hatchery to 1.22 at Captain John Rapids. Estimated survival (95% confidence interval) of PIT tagged yearlings from release to Lower Granite Dam ranged from 83.1% (80.7-85.5%) for Big Canyon to 91.7% (87.7-95.7%) for Captain John Rapids. Estimated survival from release to McNary Dam ranged from 59.9% (54.6-65.2%) for Big Canyon to 69.4% (60.5-78.4%) for Captain John Rapids. Median migration rates to Lower Granite Dam, based on all observations of PIT tagged yearlings from the FCAP facilities, ranged from 5.8 river kilometers per day (rkm/d) for Captain John Rapids to 16.2 rkm/d for Pittsburg Landing. Median migration rates to McNary Dam ranged from 11.7 rkm/d for Captain John Rapids to 17.6 rkm/d for Pittsburg Landing. Median travel times from the FCAP facilities were about 8-15 days to Lower Granite Dam and 22-27 days to McNary Dam. Median arrival dates at Lower Granite Dam, based on all observations of PIT tagged yearling groups from the FCAP facilities, ranged from April 23-25. Median arrival dates at McNary Dam for Pittsburg Landing, Big Canyon and Captain John Rapids groups ranged from May 4-10.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rocklage, Stephen J.
The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery (Snake River stock) yearling fall chinook salmon that were acclimated and released at three Fall Chinook Acclimation Project sites upstream of Lower Granite Dam along with yearlings released on-station from Lyons Ferry Hatchery in 1998. The three fall chinook acclimation facilities are operated by the Nez Perce Tribe and located at Pittsburg Landing and Captain John Rapids on the Snake River and at Big Canyon Creek on the Clearwater River. Yearlingsmore » at the Big Canyon facility consisted of two size classes that are referred to in this report as 9.5 fish per pound (fpp) and 30 fpp. The Big Canyon 9.5 fpp were comparable to the yearlings at Pittsburg Landing, Captain John Rapids and Lyons Ferry Hatchery. A total of 9,942 yearlings were PIT tagged and released at Pittsburg Landing. PIT tagged yearlings had a mean fork length of 159.9 mm and mean condition factor of 1.19. Of the 9,942 PIT tagged fish released, a total of 6,836 unique tags were detected at mainstem Snake and Columbia River dams (Lower Granite, Little Goose, Lower Monumental and McNary). A total of 4,926 9.5 fpp and 2,532 30 fpp yearlings were PIT tagged and released at Big Canyon. PIT tagged 9.5 fpp yearlings had a mean fork length of 156.9 mm and mean condition factor of 1.13. PIT tagged 30 fpp yearlings had a mean fork length of 113.1 mm and mean condition factor of 1.18. Of the 4,926 PIT tagged 9.5 fpp yearlings released, a total of 3,042 unique tags were detected at mainstem Snake and Columbia River dams. Of the 2,532 PIT tagged 30 fpp yearlings released, a total of 1,130 unique tags were detected at mainstem Snake and Columbia River dams. A total of 1,253 yearlings were PIT tagged and released at Captain John Rapids. PIT tagged yearlings had a mean fork length of 147.5 mm and mean condition factor of 1.09. Of the 1,253 PIT tagged fish released, a total of 719 unique tags were detected at mainstem Snake and Columbia River dams. A total of 2,420 yearlings were PIT tagged and released at Lyons Ferry Hatchery. PIT tagged yearlings had a mean fork length of 159.0 mm and mean condition factor of 1.10. Of the 2,420 PIT tagged fish released, a total of 979 unique tags were detected at mainstem Snake and Columbia River dams (Lower Monumental and McNary). Median travel times, based on all detections, of PIT tagged fish released from Pittsburg Landing were 10.5 days to Lower Granite Dam, 21.7 days to McNary Dam and 29.8 days to Bonneville Dam. Median migration rates were 16.4 rkm/d to Lower Granite Dam, 18.3 rkm/d to McNary Dam and 18.9 rkm/d to Bonneville Dam. The median arrival dates were April 25 at Lower Granite Dam, May 6 at McNary Dam and May 14 at Bonneville Dam. The 90% passage dates were May 5 at Lower Granite Dam, May 20 at McNary Dam and May 25 at Bonneville Dam. Median travel times, based on all detections, of PIT tagged 9.5 fpp yearlings released from Big Canyon were 13.3 days to Lower Granite Dam, 26.0 days to McNary Dam and 30.8 days to Bonneville Dam. Median migration rates were 13.0 rkm/d to Lower Granite Dam, 15.3 rkm/d to McNary Dam and 18.3 rkm/d to Bonneville Dam. The median arrival dates were April 27 at Lower Granite Dam, May 11 at McNary Dam and May 15 at Bonneville Dam. The 90% passage dates were May 9 at Lower Granite Dam, May 24 at McNary Dam and May 25 at Bonneville Dam. Median travel times, based on all detections, of PIT tagged 30 fpp yearlings released from Big Canyon were 20.8 days to Lower Granite Dam, 37.6 days to McNary Dam and 43.5 days to Bonneville Dam. Median migration rates were 8.3 rkm/d to Lower Granite Dam, 10.6 rkm/d to McNary Dam and 12.9 rkm/d to Bonneville Dam. The median arrival dates were May 5 at Lower Granite Dam, May 23 at McNary Dam and May 28 at Bonneville Dam. The 90% passage dates were May 22 at Lower Granite Dam, May 31 at McNary Dam and June 5 at Bonneville Dam. Median arrival dates, based on all detections, of PIT tagged yearlings released from Captain John Rapids were April 26 at Lower Granite Dam, May 8 at McNary Dam and May 14 at Bonneville Dam. The 90% passage dates were May 8 at Lower Granite Dam, May 23 at McNary Dam and May 26 at Bonneville Dam. Median travel times, based on all detections, of PIT tagged fish released from Lyons Ferry Hatchery were 16.9 days to Lower Monumental Dam, 20.9 days to McNary Dam and 30.3 days to Bonneville Dam. Median migration rates were 1.7 rkm/d to Lower Monumental Dam, 7.0 rkm/d to McNary Dam and 12.6 rkm/d to Bonneville Dam. The median arrival dates were April 27 at Lower Monumental Dam, May 1 at McNary Dam and May 8 at Bonneville Dam. The 90% passage dates were May 13 at Lower Monumental Dam, May 16 at McNary Dam and May 24 at Bonneville Dam.« less
Multiyear Downstream Response to Dam Removal on the White Salmon River, WA
NASA Astrophysics Data System (ADS)
Wilcox, A. C.; O'Connor, J. E.; Major, J. J.
2017-12-01
The 2011 removal of the 38 m tall Condit Dam on the White Salmon River, Washington was one of the largest dam removals to date, in terms of both dam height and sediment release. We examined the multiyear geomorphic response to this event, through 2015, including in a bedrock-confined canyon and in a less-confined, backwater-influenced pool reach near the river's mouth, to the large, rapid influx of fine reservoir sediment produced by the breach and to subsequent sediment transfer in the free-flowing White Salmon River. In the canyon reach, aggraded sediments were rapidly eroded from riffles, returning them toward pre-breach bed elevations within weeks, but pool aggradation persisted for longer. The downstream, less-confined reach transformed from a deep pool to a narrower pool-riffle channel with alternate bars; multiyear observations showed persistence of bars and of this new and distinct morphology. This downstream reach marks a rare case in post-dam removal channel response; in most dam removals, channels have rapidly reverted toward pre-removal morphology, as in the canyon reach here. Comparison of the multiyear geomorphic evolution of the White Salmon River to other recent large dam removals in the U.S. allows evaluation of the relative influences of antecedent channel morphology, post-breach hydrology, and dam removal style, as well as providing a basis for predicting responses to future dam removals.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rocklage, Stephen J.; Kellar, Dale S.
2005-07-01
The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project sites upstream of Lower Granite Dam along with yearlings released on-station from Lyons Ferry Hatchery in 2000. This was the fifth year of a long-term project to supplement natural spawning populations of Snake River stock fall Chinook salmon upstream of Lower Granite Dam. The 397,339 yearlings released from the Fall Chinook Acclimation Projectmore » facilities were short of the 450,000 fish quota. We use Passive Integrated Transponder (PIT) tag technology to monitor the primary performance measures of survival to mainstem dams and migration timing. We also monitor size, condition and tag/mark retention at release. We released 7,477 PIT tagged yearlings from Pittsburg Landing, 7,421 from Big Canyon and 2,488 from Captain John Rapids. The Washington Department of Fish and Wildlife released 980 PIT tagged yearlings from Lyons Ferry Hatchery. Fish health sampling indicated that, overall, bacterial kidney disease levels could be considered relatively low. Compared to prior years, Quantitative Health Assessment Indices were relatively low at Big Canyon and Captain John Rapids and about average at Pittsburg Landing and Lyons Ferry Hatchery. Mean fork lengths (95% confidence interval) of the PIT tagged groups ranged from 157.7 mm (157.3-158.1 mm) at Big Canyon to 172.9 mm (172.2-173.6 mm) at Captain John Rapids. Mean condition factors ranged from 1.06 at Captain John Rapids and Lyons Ferry Hatchery to 1.12 at Big Canyon. Estimated survival (95% confidence interval) of PIT tagged yearlings from release to Lower Granite Dam ranged from 87.0% (84.7-89.4%) for Pittsburg Landing to 95.2% (91.5-98.9%) for Captain John Rapids. Estimated survival from release to McNary Dam ranged from 65.8% (58.5-73.1%) for Lyons Ferry Hatchery to 84.0% (76.2-91.8%) for Captain John Rapids. Median migration rates to Lower Granite Dam, based on all observations of PIT tagged yearlings from the FCAP facilities, ranged from 10.1 river kilometers per day (rkm/d) for Captain John Rapids to 19.1 rkm/d for Pittsburg Landing. Median migration rates to McNary Dam ranged from 6.0 rkm/d for Lyons Ferry Hatchery to 17.3 rkm/d for Pittsburg Landing. Median travel times from the FCAP facilities were about 9-10 days to Lower Granite Dam and 22-25 days to McNary Dam. Median arrival dates at Lower Granite Dam, based on all observations of PIT tagged yearling groups from Pittsburg Landing, Big Canyon and Captain John Rapids, were all from April 21-22. Median arrival dates at McNary Dam for Pittsburg Landing, Big Canyon and Captain John Rapids groups were all from May 5-6. The median arrival date at McNary Dam was April 24 for Lyons Ferry Hatchery yearlings.« less
Parsley, M.J.; Kofoot, P.
2008-01-01
Describe reproduction and early life history characteristics of white sturgeon populations in the Columbia River between Bonneville and Priest Rapids dams. Define habitat requirements for spawning and rearing white sturgeon and quantify the extent of habitat available in the Columbia River between Bonneville and Priest Rapids dams. Progress updates on young-of-the-year recruitment in Bonneville Reservoir and indices of white sturgeon spawning habitat for 2006 for McNary, John Day, The Dalles, and Bonneville dam tailrace spawning areas.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rocklage, Stephen J.; Kellar, Dale S.
2005-07-01
The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project (FCAP) sites upstream of Lower Granite Dam along with yearlings released on-station from Lyons Ferry Hatchery in 1999. This was the fourth year of a long-term project to supplement natural spawning populations of Snake River stock fall Chinook salmon upstream of Lower Granite Dam. The 453,117 yearlings released from the Fall Chinook Acclimationmore » Project facilities not only slightly exceeded the 450,000 fish quota, but a second release of 76,386 yearlings (hereafter called Surplus) were acclimated at the Big Canyon facility and released about two weeks after the primary releases. We use Passive Integrated Transponder (PIT) tag technology to monitor the primary performance measures of survival to mainstem dams and migration timing. We also monitor size, condition and tag/mark retention at release. We released 9,941 PIT tagged yearlings from Pittsburg Landing, 9,583 from Big Canyon, 2,511 Big Canyon Surplus and 2,494 from Captain John Rapids. The Washington Department of Fish and Wildlife released 983 PIT tagged yearlings from Lyons Ferry Hatchery. Fish health sampling indicated that, overall, bacterial kidney disease levels could be considered relatively low and did not appear to increase after transport to the acclimation facilities. Compared to prior years, Quantitative Health Assessment Indices were relatively low at Pittsburg Landing and Lyons Ferry Hatchery and relatively high at Big Canyon and Captain John Rapids. Mean fork lengths (95% confidence interval) of the release groups ranged from 147.4 mm (146.7-148.1 mm) at Captain John Rapids to 163.7 mm (163.3-164.1 mm) at Pittsburg Landing. Mean condition factors ranged from 1.04 at Pittsburg Landing to 1.23 at Captain John Rapids. Estimated survival (95% confidence interval) of PIT tagged yearlings from release to Lower Granite Dam ranged from 87.8% (82.1-93.4%) for Big Canyon Surplus to 94.1% (90.1-98.1%) for Captain John Rapids. Estimated survival from release to McNary Dam ranged from 58.7% (49.3-68.1%) for Big Canyon Surplus to 71.3% (60.1-82.5%) for Captain John Rapids. Median migration rates to Lower Granite Dam, based on all observations of PIT tagged yearlings from the FCAP facilities, ranged from 9.3 river kilometers per day (rkm/d) for Captain John Rapids to 18.7 rkm/d for Pittsburg Landing. Median migration rates to McNary Dam ranged from 9.0 rkm/d for Lyons Ferry Hatchery to 17.3 rkm/d for Pittsburg Landing. Median travel times from the FCAP facilities were about 7-10 days to Lower Granite Dam and 21-23 days to McNary Dam. Median arrival dates at Lower Granite Dam, based on all observations of PIT tagged yearling groups from the FCAP facilities, were all from April 23-25. The median arrival date for Big Canyon Surplus was May 4. Median arrival dates at McNary Dam for Pittsburg Landing, Big Canyon and Captain John Rapids groups were all from May 7-8. Median arrival dates at McNary Dam were May 17 for Big Canyon Surplus and April 26 for Lyons Ferry Hatchery.« less
Finch, Colton G.; Pine, William E.; Yackulic, Charles B.; Dodrill, Michael J.; Yard, Michael D.; Gerig, Brandon S.; Coggins,, Lewis G.; Korman, Josh
2016-01-01
The Colorado River below Glen Canyon Dam, Arizona, is part of an adaptive management programme which optimizes dam operations to improve various resources in the downstream ecosystem within Grand Canyon. Understanding how populations of federally endangered humpback chub Gila cypha respond to these dam operations is a high priority. Here, we test hypotheses concerning temporal variation in juvenile humpback chub apparent survival rates and abundance by comparing estimates between hydropeaking and steady discharge regimes over a 3-year period (July 2009–July 2012). The most supported model ignored flow type (steady vs hydropeaking) and estimated a declining trend in daily apparent survival rate across years (99.90%, 99.79% and 99.67% for 2009, 2010 and 2011, respectively). Corresponding abundance of juvenile humpback chub increased temporally; open population model estimates ranged from 615 to 2802 individuals/km, and closed model estimates ranged from 94 to 1515 individuals/km. These changes in apparent survival and abundance may reflect broader trends, or simply represent inter-annual variation. Important findings include (i) juvenile humpback chub are currently surviving and recruiting in the mainstem Colorado River with increasing abundance; (ii) apparent survival does not benefit from steady fall discharges from Glen Canyon Dam; and (iii) direct assessment of demographic parameters for juvenile endangered fish are possible and can rapidly inform management actions in regulated rivers.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rocklage, Stephen J.; Kellar, Dale S.
2005-07-01
The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project sites upstream of Lower Granite Dam along with yearlings released on-station from Lyons Ferry Hatchery in 2001. This was the sixth year of a long-term project to supplement natural spawning populations of Snake River stock fall Chinook salmon upstream of Lower Granite Dam. The 318,932 yearlings released from the Fall Chinook Acclimation Projectmore » facilities were short of the 450,000 fish quota. We use Passive Integrated Transponder (PIT) tag technology to monitor the primary performance measures of survival to mainstem dams and migration timing. We also monitor size, condition and tag/mark retention at release. We released 7,503 PIT tagged yearlings from Pittsburg Landing, 7,499 from Big Canyon and 2,518 from Captain John Rapids. The Washington Department of Fish and Wildlife released 991 PIT tagged yearlings from Lyons Ferry Hatchery. Fish health sampling indicated that, overall, bacterial kidney disease levels could be considered relatively low. Compared to prior years, Quantitative Health Assessment Indices were relatively low at Big Canyon and Captain John Rapids and about average at Pittsburg Landing and Lyons Ferry Hatchery. Mean fork lengths (95% confidence interval) of the PIT tagged groups ranged from 155.4 mm (154.7-156.1 mm) at Captain John Rapids to 171.6 mm (170.7-172.5 mm) at Lyons Ferry Hatchery. Mean condition factors ranged from 1.02 at Lyons Ferry Hatchery to 1.16 at Big Canyon and Captain John Rapids. Estimated survival (95% confidence interval) of PIT tagged yearlings from release to Lower Granite Dam ranged from 74.4% (73.2-75.5%) for Big Canyon to 85.2% (83.5-87.0%) for Captain John Rapids. Estimated survival from release to McNary Dam ranged from 37.9% (36.0-40.0%) for Pittsburg Landing to 57.9% (53.0-62.8%) for Lyons Ferry Hatchery. Median migration rates to Lower Granite Dam, based on all observations of PIT tagged yearlings from the FCAP facilities, ranged from 6.3 river kilometers per day (rkm/d) for Big Canyon to 10.8 rkm/d for Pittsburg Landing. Median migration rates to McNary Dam ranged from 5.2 rkm/d for Lyons Ferry Hatchery to 10.9 rkm/d for Pittsburg Landing. Median travel times from the FCAP facilities were about 13-17 days to Lower Granite Dam and 31-37 days to McNary Dam. Median arrival dates at Lower Granite Dam, based on all observations of PIT tagged yearling groups from Pittsburg Landing, Big Canyon and Captain John Rapids, were all from April 26-27. Median arrival dates at McNary Dam for Pittsburg Landing, Big Canyon and Captain John Rapids groups were all from May 14-18. The median arrival date at McNary Dam was May 13 for Lyons Ferry Hatchery yearlings.« less
Debris flow deposition and reworking by the Colorado River in Grand Canyon, Arizona
Yanites, Brian J.; Webb, Robert H.; Griffiths, Peter G.; Magirl, Christopher S.
2006-01-01
Flow regulation by large dams affects downstream flow competence and channel maintenance. Debris flows from 740 tributaries in Grand Canyon, Arizona, transport coarse‐grained sediment onto debris fans adjacent to the Colorado River. These debris fans constrict the river to form rapids and are reworked during river flows that entrain particles and transport them downstream. Beginning in 1963, flood control operations of Glen Canyon Dam limited the potential for reworking of aggraded debris fans. We analyzed change in debris fans at the mouths of 75‐Mile and Monument Creeks using photogrammetry of aerial photography taken from 1965 to 2000 and supplemented with ground surveys performed from 1987 to 2005. Our results quantify the debris fan aggradation that resulted from debris flows from 1984 to 2003. Volume, area, and river constriction increased at both debris fans. Profiles of the two debris fans show that net aggradation occurred in the middle of debris fans at stages above maximum dam releases, and surface shape shifted from concave to convex. Dam releases above power plant capacity partially reworked both debris fans, although reworking removed much less sediment than what was added by debris flow deposition. Large dam releases would be required to create additional reworking to limit the rate of debris fan aggradation in Grand Canyon.
Emergency Planning for Dams: Bibliography and Abstracts of Selected Publications,
1982-01-01
Government Operations. Teton Dam Disaster: Hearings Before a Subcom- mittee of the Committee on Government Operations, House of Representatives. U.S...Government Printing Office. Washington, DC. 1976. Committee on Government Operations. Teton Dam Disaster: Thirtieth Response. U.S. Government Printing Office...Design Earthquakes. * Teton Dam Failure. *Summary of 1st Session on Evaluation OSummary of Session on Failure and of Seismic Stability. Near Failure
Project Operations: Flood Control Operations and Maintenance Policies
1996-10-30
President and an internal review performed by the Corps task group shortly after failure of the Teton Dam , we have undertaken numerous actions to modify our...practice for design, construction and operation of Corps reservoir projects. One important item as a result of the Teton Dam failure and the review...1 Glossary 1-4 1-2 CHAPTER 2 - Dam Operations Management Purpose 2-1 2-1 Policy 2-2 2-1 Emergency Plan 2-3 2-1 Dam Safety Training 2-4 2-2
The remains of the dam: what have we learned from 15 years of US dam removals?
Gordon E. Grant; Sarah L. Lewis
2015-01-01
Important goals for studying dam removal are to learn how rivers respond to large and rapid introductions of sediment, and to develop predictive models to guide future dam removals. Achieving these goals requires organizing case histories systematically so that underlying physical mechanisms determining rates and styles of sediment erosion, transport, and deposition...
Dams, Hydrology and Risk in Future River Management
NASA Astrophysics Data System (ADS)
Wegner, D. L.
2017-12-01
Across America there are over 80,000 large to medium dams and globally the number is in excess of 800,000. Currently there are over 1,400 dams and diversion structures being planned or under construction globally. In addition to these documented dams there are thousands of small dams populating watersheds. Governments, agencies, native tribes, private owners and regulators all have a common interest in safe dams. Often dam safety is characterized as reducing structural risk while providing for maximum operational flexibility. In the 1970's there were a number of large and small dam failures in the United States. These failures prompted the federal government to issue voluntary dam safety guidelines. These guidelines were based on historic information incorporated into a risk assessment process to analyze, evaluate and manage risk with the goal to improve the quality of and support of dam management and safety decisions. We conclude that historic and new risks need to be integrated into dam management to insure adequate safety and operational flexibility. A recent assessment of the future role of dams in the United States premises that future costs such as maintenance or removal beyond the economic design life have not been factored into the long-term operations or relicensing of dams. The converging risks associated with aging water storage infrastructure, multiple dams within watersheds and uncertainty in demands policy revisions and an updated strategic approach to dam safety. Decisions regarding the future of dams in the United States may, in turn, influence regional water planning and management. Leaders in Congress and in the states need to implement a comprehensive national water assessment and a formal analysis of the role dams play in our water future. A research and national policy agenda is proposed to assess future impacts and the design, operation, and management of watersheds and dams.
78 FR 34258 - Safety Zone; Salvage Operations at Marseilles Dam; Illinois River
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-07
...-AA00 Safety Zone; Salvage Operations at Marseilles Dam; Illinois River AGENCY: Coast Guard, DHS. ACTION... Illinois River starting at Mile Marker 246.9 and extending 600 yards upstream of the Marseilles Dam to Mile... repair efforts at the Marseilles Dam. This safety zone is necessary to protect the general public...
The rapid return of marine-derived nutrients to a freshwater food web following dam removal
Tonra, Christopher M; Sager-Fradkin, Kimberly A.; Morley, Sarah A; Duda, Jeff; Marra, Peter P.
2015-01-01
Dam removal is increasingly being recognized as a viable river restoration action. Although the main beneficiaries of restored connectivity are often migratory fish populations, little is known regarding recovery of other parts of the freshwater food web, particularly terrestrial components. We measured stable isotopes in key components to the freshwater food web: salmon, freshwater macroinvertebrates and a river specialist bird, American dipper (Cinclus mexicanus), before and after removal of the Elwha Dam, WA, USA. Less than a year after dam removal, salmon returned to the system and released marine-derived nutrients (MDN). In that same year we documented an increase in stable-nitrogen and carbon isotope ratios in American dippers. These results indicate that MDN from anadromous fish, an important nutrient subsidy that crosses the aquatic–terrestrial boundary, can return rapidly to food webs after dams are removed which is an important component of ecosystem recovery.
Environmental effects of the Big Rapids dam remnant removal, Big Rapids, Michigan, 2000-02
Healy, Denis F.; Rheaume, Stephen J.; Simpson, J. Alan
2003-01-01
The U.S. Geological Survey (USGS), in cooperation with the city of Big Rapids, investigated the environmental effects of removal of a dam-foundation remnant and downstream cofferdam from the Muskegon River in Big Rapids, Mich. The USGS applied a multidiscipline approach, which determined the water quality, sediment character, and stream habitat before and after dam removal. Continuous water-quality data and discrete water-quality samples were collected, the movement of suspended and bed sediment were measured, changes in stream habitat were assessed, and streambed elevations were surveyed. Analyses of water upstream and downstream from the dam showed that the dam-foundation remnant did not affect water quality. Dissolved-oxygen concentrations downstream from the dam remnant were depressed for a short period (days) during the beginning of the dam removal, in part because of that removal effort. Sediment transport from July 2000 through March 2002 was 13,800 cubic yards more at the downstream site than the upstream site. This increase in sediment represents the remobilized sediment upstream from the dam, bank erosion when the impoundment was lowered, and contributions from small tributaries between the sites. Five habitat reaches were monitored before and after dam-remnant removal. The reaches consisted of a reference reach (A), upstream from the effects of the impoundment; the impoundment (B); and three sites below the impoundment where habitat changes were expected (C, D, and E, in downstream order). Stream-habitat assessment reaches varied in their responses to the dam-remnant removal. Reference reach A was not affected. In impoundment reach B, Great Lakes and Environmental Assessment Section (GLEAS) Procedure 51 ratings went from fair to excellent. For the three downstream reaches, reach C underwent slight habitat degradation, but ratings remained good; reach D underwent slight habitat degradation with ratings changing from excellent to good; and, in an area affected by a 1966 sediment release, reach E habitat rated fair in April 2000 and remained fair in September 2001. The most noticeable habitat change in the three reaches downstream from the dam site was a measurable increase in siltation and embeddedness. Bed-elevation profiles show that bed material upstream from the dam site was remobilized as suspended sediment and bedload, and was redeposited in the reaches below the cofferdam. Deposition was greater in the deep, slow-moving pools than the shallow, fast-moving riffles. For the most part, where deposition took place, deposits were less than 1 foot in thickness. In the year following the removal of the cofferdam, much of the sediment deposited below the dam was moved out of the study reach.
94. DAM TAINTER GATE OPERATING MACHINERY METHOD OF ...
94. DAM - TAINTER GATE OPERATING MACHINERY - METHOD OF ATTACHING LIFTING CHAINS TO DRUMS OF HOIST - LAKESIDE TYPE (ML-4&5-55/34-FS), February 1938 - Upper Mississippi River 9-Foot Channel, Lock & Dam No. 4, Alma, Buffalo County, WI
Wind-Driven Ecological Flow Regimes Downstream from Hydropower Dams
NASA Astrophysics Data System (ADS)
Kern, J.; Characklis, G. W.
2012-12-01
Conventional hydropower can be turned on and off quicker and less expensively than thermal generation (coal, nuclear, or natural gas). These advantages enable hydropower utilities to respond to rapid fluctuations in energy supply and demand. More recently, a growing renewable energy sector has underlined the need for flexible generation capacity that can complement intermittent renewable resources such as wind power. While wind power entails lower variable costs than other types of generation, incorporating it into electric power systems can be problematic. Due to variable and unpredictable wind speeds, wind power is difficult to schedule and must be used when available. As a result, integrating large amounts of wind power into the grid may result in atypical, swiftly changing demand patterns for other forms of generation, placing a premium on sources that can be rapidly ramped up and down. Moreover, uncertainty in wind power forecasts will stipulate increased levels of 'reserve' generation capacity that can respond quickly if real-time wind supply is less than expected. These changes could create new hourly price dynamics for energy and reserves, altering the short-term financial signals that hydroelectric dam operators use to schedule water releases. Traditionally, hourly stream flow patterns below hydropower dams have corresponded in a very predictable manner to electricity demand, whose primary factors are weather (hourly temperature) and economic activity (workday hours). Wind power integration has the potential to yield more variable, less predictable flows at hydro dams, flows that at times could resemble reciprocal wind patterns. An existing body of research explores the impacts of standard, demand-following hydroelectric dams on downstream ecological flows; but weighing the benefits of increased reliance on wind power against further impacts to ecological flows may be a novel challenge for the environmental community. As a preliminary step in meeting this challenge, the following study was designed to investigate the potential for wind power integration to alter riparian flow regimes below hydroelectric dams. A hydrological model of a three-dam cascade in the Roanoke River basin (Virginia, USA) is interfaced with a simulated electricity market (i.e. a unit commitment problem) representing the Dominion Zone of PJM Interconnection. Incorporating forecasts of electricity demand, hydro capacity and wind availability, a mixed-integer optimization program minimizes the system cost of meeting hourly demand and reserve requirements by means of a diverse generation portfolio (e.g. nuclear, fossil, hydro, and biomass). A secondary 'balancing' energy market is executed if real-time wind generation is less than the day-ahead forecast, calling upon reserved generation resources to meet the supply shortfall. Hydropower release schedules are determined across a range of wind development scenarios (varying wind's fraction of total installed generating capacity, as well as its geographical source region). Flow regimes for each wind development scenario are compared against both historical and simulated flows under current operations (negligible wind power), as well as simulated natural flows (dam removal), in terms of ecologically relevant flow metrics. Results quantify the ability of wind power development to alter within-week stream flows downstream from hydropower dams.
Rapid water quality change in the Elwha River estuary complex during dam removal
Foley, Melissa M.; Duda, Jeffrey J.; Beirne, Matthew M.; Paradis, Rebecca; Ritchie, Andrew; Warrick, Jonathan A.
2015-01-01
Dam removal in the United States is increasing as a result of structural concerns, sedimentation of reservoirs, and declining riverine ecosystem conditions. The removal of the 32 m Elwha and 64 m Glines Canyon dams from the Elwha River in Washington, U.S.A., was the largest dam removal project in North American history. During the 3 yr of dam removal—from September 2011 to August 2014—more than ten million cubic meters of sediment was eroded from the former reservoirs, transported downstream, and deposited throughout the lower river, river delta, and nearshore waters of the Strait of Juan de Fuca. Water quality data collected in the estuary complex at the mouth of the Elwha River document how conditions in the estuary changed as a result of sediment deposition over the 3 yr the dams were removed. Rapid and large-scale changes in estuary conditions—including salinity, depth, and turbidity—occurred 1 yr into the dam removal process. Tidal propagation into the estuary ceased following a large sediment deposition event that began in October 2013, resulting in decreased salinity, and increased depth and turbidity in the estuary complex. These changes have persisted in the system through dam removal, significantly altering the structure and functioning of the Elwha River estuary ecosystem.
Westjohn, David B.
1997-01-01
The proposed removal of the remnants of a hydroelectric dam in the Muskegon River at Big Rapids, Michigan, will potentially affect flow of the river at the city's water intake system. Fifteen boreholes were augered in bottom sediments in the river just upstream from the dam relic, and streambottom profiles were made using ground-penetrating radar. Data from boreholes show that sediments captured by the dam foundation were deposited in two distinctly different sedimentary environments. Sediments that overlie the pre-dam channel surface consist of lacustrine clay, wood chips, silt, and sand. These lacustrine sediments are interbedded in a cyclical fashion, and they were deposited under low flow to stagnant water conditions during 1916-66, when a 17-foot-tall hydroelectric dam was in place. Demolition of the upper 13 feet of this dam in 1966 resulted in erosion of most of the lacustrine sediments, and subsequent deposition of coarser alluvium in the impoundment behind the remaining dam foundation. Lacustrine sediments are present in the active part of the stream channel and extend from the dam foundation to about 1,300 feet upstream. The composite thickness of lacustrine sediments and overlying coarser alluvium was determined from sediment cores collected from the boreholes. The volume of these sediments is estimated to be about 19,000 cubic yards.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sylvester, Ryan; Stephens, Brian; Tohtz, Joel
2009-04-03
A new project began in 2005 to monitor the biological and physical effects of improved operations of Hungry Horse and Libby Dams, Montana, called for by the Northwest Power and Conservation Council (NPCC) Mainstem Amendment. This operating strategy was designed to benefit resident fish impacted by hydropower and flood control operations. Under the new operating guidelines, July through September reservoir drafts will be limited to 10 feet from full pool during the highest 80% of water supply years and 20 feet from full pool during the lowest 20% of water supply (drought) years. Limits were also established on how rapidlymore » discharge from the dams can be increased or decreased depending on the season. The NPCC also directed the federal agencies that operate Libby and Hungry Horse Dams to implement a new flood control strategy (VARQ) and directed Montana Fish, Wildlife & Parks to evaluate biological responses to this operating strategy. The Mainstem Amendment operating strategy has not been fully implemented at the Montana dams as of June 2008 but the strategy will be implemented in 2009. This report highlights the monitoring methods used to monitor the effects of the Mainstem Amendment operations on fishes, habitat, and aquatic invertebrates upstream and downstream of Libby Dam. We also present initial assessments of data and the effects of various operating strategies on physical and biological components of the systems upstream and downstream of Libby Dam. Annual electrofishing surveys in the Kootenai River and selected tributaries, along with gill net surveys in the reservoir, are being used to quantify the impacts of dam operations on fish populations upstream and downstream of Libby Dam. Scales and otoliths are being used to determine the age structure and growth of focal species. Annual population estimates and tagging experiments provide estimates of survival and growth in the mainstem Kootenai River and selected tributaries. Radio telemetry will be used to validate an existing Instream Flow Incremental Methodology (IFIM) model developed for the Kootenai River and will also be used to assess the effect of changes in discharge on fish movements and habitat use downstream of Libby Dam. Passive integrated transponder (PIT) tags will be injected into rainbow, bull, and cutthroat trout throughout the mainstem Kootenai River and selected tributaries to provide information on growth, survival, and migration patterns in relation to abiotic and biotic variables. Model simulations (RIVBIO) are used to calculate the effects of dam operations on the wetted perimeter and benthic biomass in the Kootenai River below Libby Dam. Additional models (IFIM) will also be used to evaluate the impacts of dam operations on the amount of available habitat for different life stages of rainbow and bull trout in the Kootenai River.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Richmond, Marshall C.; Rakowski, Cynthia L.; Serkowski, John A.
2013-06-25
Over the past two decades, there have been many studies describing injury mechanisms associated with turbine passage, the response of various fish species to these mechanisms, and the probability of survival through dams. Although developing tools to design turbines that improve passage survival has been difficult and slow, a more robust quantification of the turbine environment has emerged through integrating physical model data, fish survival data, and computational fluid dynamics (CFD) studies. Grant County Public Utility District (GCPUD) operates the Priest Rapids Dam (PRD), a hydroelectric facility on the Columbia River in Washington State. The dam contains 10 Kaplan-type turbinemore » units that are now almost 50 years old. The Utility District plans to refit all of these aging turbines with new turbines. The Columbia River at PRD is a migratory pathway for several species of juvenile and adult salmonids, so passage of fish through the dam is a major consideration when replacing the turbines. In this presentation, a method for turbine biological performance assessment (BioPA) is introduced. Using this method, a suite of biological performance indicators is computed based on simulated data from a CFD model of a proposed turbine design. Each performance indicator is a measure of the probability of exposure to a certain dose of an injury mechanism. Using known relationships between the dose of an injury mechanism and frequency of injury (dose–response) from laboratory or field studies, the likelihood of fish injury for a turbine design can be computed from the performance indicator. By comparing the values of the indicators from proposed designs, the engineer can identify the more-promising alternatives. We will present application of the BioPA method for baseline risk assessment calculations for the existing Kaplan turbines at PRD that will be used as the minimum biological performance that a proposed new design must achieve.« less
Perry, Russell W.; Kock, Tobias J.; Couter, Ian I; Garrison, Thomas M; Hubble, Joel D; Child, David B
2016-01-01
Diversion dams can negatively affect emigrating juvenile salmon populations because fish must pass through the impounded river created by the dam, negotiate a passage route at the dam and then emigrate through a riverine reach that has been affected by reduced river discharge. To quantify the effects of a main-stem diversion dam on juvenile Chinook salmon in the Yakima River, Washington, USA, we used radio telemetry to understand how dam operations and river discharge in the 18-km reach downstream of the dam affected route-specific passage and survival. We found evidence of direct mortality associated with dam passage and indirect mortality associated with migration through the reach below the dam. Survival of fish passing over a surface spill gate (the west gate) was positively related to river discharge, and survival was similar for fish released below the dam, suggesting that passage via this route caused little additional mortality. However, survival of fish that passed under a sub-surface spill gate (the east gate) was considerably lower than survival of fish released downstream of the dam, with the difference in survival decreasing as river discharge increased. The probability of fish passing the dam via three available routes was strongly influenced by dam operations, with passage through the juvenile fish bypass and the east gate increasing with discharge through those routes. By simulating daily passage and route-specific survival, we show that variation in total survival is driven by river discharge and moderated by the proportion of fish passing through low-survival or high-survival passage routes.
75 FR 65299 - Endangered and Threatened Species; Recovery Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-22
.../quantity. Address direct impacts of Willamette hydropower and flood control dam/reservoir operations by... eastside tributaries of the Willamette River; adverse thermal effects downstream from operation of the dams... spawning is high. c. Downstream passage survival of juvenile offspring through the reservoir and dam...
Waidyanatha, Suramya; Toy, Heather; South, Natalie; Gibbs, Seth; Mutlu, Esra; Burback, Brian; McIntyre, Barry S; Catlin, Natasha
2018-01-01
Vinpocetine is being used worldwide by people of all ages, including pregnant women, for its purported multiple health benefits. However, limited data is available addressing the safety/toxicity of vinpocetine. The National Toxicology Program conducted studies to examine potential effects of vinpocetine on the developing rat. Disposition data is helpful to put the fetal findings into context and provide information on the potential risk for humans. The current study reports the systemic exposure and toxicokinetic (TK) parameters of vinpocetine and metabolite, apovincaminic acid (AVA), in pregnant Harlan Sprague Dawley rats, fetuses and amniotic fluid following oral gavage exposure of dams to 5 and 20mg/kg vinpocetine from gestational day 6 to 18. Vinpocetine was absorbed rapidly in dams with a maximum plasma concentration (C max ) reaching ≤1.37h. Predicted C max and area under the concentration versus time curve (AUC) increased less than proportionally to the dose. Vinpocetine was rapidly distributed to the peripheral compartment. More importantly, significant transfer of vinpocetine from dam to fetuses was observed with fetal C max and AUC≥55% of dams. Vinpocetine was cleared rapidly from dam plasma with an elimination half-life of ≤4.02h with no apparent dose-related effect. Vinpocetine was rapidly and highly metabolized to AVA with AVA plasma levels in dams ≥2.7-fold higher than vinpocetine, although in the fetuses, AVA levels were much lower than vinpocetine. Comparison of current rat data with literature human data demonstrates that systemic exposure to vinpocetine in rats following repeated exposure to 5mg/kg is similar to that following a single human relevant dose of 10mg suggesting that the findings from the toxicology study may be relevant to humans. Published by Elsevier Inc.
An Evaluation of the Success Rate of Sermo Dam Management in Daerah Istimewa Yogyakarta
NASA Astrophysics Data System (ADS)
Andriawan, A.; Sobriyah; Ikhsan, C.
2017-11-01
In dam operating and maintaining activities, there are some activities becoming the main function: the assessment of dam condition to keep monitoring and safeguarding the condition of dam as the main building. To achieve the maximum service, the maximal dam management is required as well and it should be followed with management evaluation. This case study was taken place in Sermo Dam of Daerah Istimewa Yogyakarta during 2015 - 2017. The method applied in this study was descriptive quantitative one, conducting a research using primary and secondary data. In this research, the assessment of dam condition was viewed from 1 (one) component, dam body, so that the component weight was 100%. The value of dam body condition was obtained from data of Sermo Dam monitoring in 2015-2016 and from the result of field survey in 2017. The result of research showed that the condition values of Sermo Dam with dam body component were 92.66% in 2015, 92.99% in 2016, and 93.99% in 2017. The result also showed that the value of dam body condition tended to increase during 2015-2017. To maintain the condition, the maximal operation and maintenance of dam was recommended.
Buccola, Norman L.; Rounds, Stewart A.; Sullivan, Annett B.; Risley, John C.
2012-01-01
Detroit Dam was constructed in 1953 on the North Santiam River in western Oregon and resulted in the formation of Detroit Lake. With a full-pool storage volume of 455,100 acre-feet and a dam height of 463 feet, Detroit Lake is one of the largest and most important reservoirs in the Willamette River basin in terms of power generation, recreation, and water storage and releases. The U.S. Army Corps of Engineers operates Detroit Dam as part of a system of 13 reservoirs in the Willamette Project to meet multiple goals, which include flood-damage protection, power generation, downstream navigation, recreation, and irrigation. A distinct cycle in water temperature occurs in Detroit Lake as spring and summer heating through solar radiation creates a warm layer of water near the surface and isolates cold water below. Controlling the temperature of releases from Detroit Dam, therefore, is highly dependent on the location, characteristics, and usage of the dam's outlet structures. Prior to operational changes in 2007, Detroit Dam had a well-documented effect on downstream water temperature that was problematic for endangered salmonid fish species, releasing water that was too cold in midsummer and too warm in autumn. This unnatural seasonal temperature pattern caused problems in the timing of fish migration, spawning, and emergence. In this study, an existing calibrated 2-dimensional hydrodynamic water-quality model [CE-QUAL-W2] of Detroit Lake was used to determine how changes in dam operation or changes to the structural release points of Detroit Dam might affect downstream water temperatures under a range of historical hydrologic and meteorological conditions. The results from a subset of the Detroit Lake model scenarios then were used as forcing conditions for downstream CE-QUAL-W2 models of Big Cliff Reservoir (the small reregulating reservoir just downstream of Detroit Dam) and the North Santiam and Santiam Rivers. Many combinations of environmental, operational, and structural options were explored with the model scenarios. Multiple downstream temperature targets were used along with three sets of environmental forcing conditions representing cool/wet, normal, and hot/dry conditions. Five structural options at Detroit Dam were modeled, including the use of existing outlets, one hypothetical variable-elevation outlet such as a sliding gate, a hypothetical combination of a floating outlet and a fixed-elevation outlet, and a hypothetical combination of a floating outlet and a sliding gate. Finally, 14 sets of operational guidelines for Detroit Dam were explored to gain an understanding of the effects of imposing different downstream minimum streamflows, imposing minimum outflow rules to specific outlets, and managing the level of the lake with different timelines through the year. Selected subsets of these combinations of operational and structural scenarios were run through the downstream models of Big Cliff Reservoir and the North Santiam and Santiam Rivers to explore how hypothetical changes at Detroit Dam might provide improved temperatures for endangered salmonids downstream of the Detroit-Big Cliff Dam complex. Conclusions that can be drawn from these model scenarios include: *The water-temperature targets set by the U.S. Army Corps of Engineers for releases from Detroit Dam can be met through a combination of new dam outlets or a delayed drawdown of the lake in autumn. *Spring and summer dam operations greatly affect the available release temperatures and operational flexibility later in the autumn. Releasing warm water during midsummer tends to keep more cool water available for release in autumn. *The ability to meet downstream temperature targets during spring depends on the characteristics of the available outlets. Under existing conditions, although warm water sometimes is present at the lake surface in spring and early summer, such water may not be available for release if the lake level is either well below or well above the spillway crest. *Managing lake releases to meet downstream temperature targets depends on having outlet structures that can access both (warm) lake surface water and (cold) deeper lake water throughout the year. The existing outlets at Detroit Dam do not allow near-surface waters to be released during times when the lake surface level is below the spillway (spring and autumn). *Using the existing outlets at Detroit Dam, lake level management is important to the water temperature of releases because it controls the availability and depth of water at the spillway. When lake level is lowered below the spillway crest in late summer, the loss of access to warm water at the lake surface can result in abrupt changes to release temperatures. *Because the power-generation intakes (penstocks) are 166 feet below the full-pool lake level, imposing minimum power production requirements at Detroit Dam limits the amount of warm surface water that can be expelled from the lake in midsummer, thereby postponing and amplifying warm outflows from Detroit Lake into the autumn spawning season. *Likewise, imposing minimum power production requirements at Detroit Dam in autumn can limit the amount of cool hypolimnetic water that is released from the lake, thereby limiting cool outflows from Detroit Lake during the autumn spawning season. *Model simulations indicate that a delayed drawdown of Detroit Lake in autumn would result in better control over release temperatures in the immediate downstream vicinity of Big Cliff Dam, but the reduced outflows necessary to retain more water in the lake in late summer are more susceptible to rapid heating downstream. *Compared to the existing outlets at Detroit Dam, floating or sliding-gate outlet structures can provide greater control over release temperatures because they provide better access to warm water at the lake surface and cooler water at depth. These conclusions can be grouped into several common themes. First, optimal and flexible management and achievement of downstream temperature goals requires that releases of warm water near the surface of the lake and cold water below the thermocline are both possible with the available dam outlets during spring, summer, and autumn. This constraint can be met to some extent with existing outlets, but only if access to the spillway is extended into autumn by keeping the lake level higher than called for by the current rule curve (the typical target water-surface elevation throughout the year). If new outlets are considered, a variable-elevation outlet such as a sliding gate structure, or a floating outlet in combination with a fixed-elevation outlet at sufficient depth to access cold water, is likely to work well in terms of accessing a range of water temperatures and achieving downstream temperature targets. Furthermore, model results indicate that it is important to release warm water from near the lake surface during midsummer. If not released downstream, the warm water will build up at the top of the lake as a result of solar energy inputs and the thermocline will deepen, potentially causing warm water to reach the depth of deeper fixed-elevation outlets in autumn, particularly when the lake level is drawn down to make room for flood storage. Delaying the drawdown in autumn can help to keep the thermocline above such outlets and preserve access to cold water. Although it is important to generate hydropower at Detroit Dam, minimum power-production requirements limit the ability of dam operators to meet downstream temperature targets with existing outlet structures. The location of the power penstocks below the thermocline in spring and most of summer causes the release of more cool water during summer than is optimal. Reducing the power-production constraint allows the temperature target to be met more frequently, but at the cost of less power generation. Finally, running the Detroit Dam, Big Cliff Dam, and North Santiam and Santiam River models in series allows dam operators to evaluate how different operational strategies or combinations of new dam outlets might affect downstream temperatures for many miles of critical endangered salmonid habitat. Temperatures can change quickly in these downstream reaches as the river exchanges heat with its surroundings, and heating or cooling of 6 degrees Celsius is not unusual in the 40–50 miles downstream of Big Cliff Dam. The results published in this report supersede preliminary results published in U.S. Geological Survey Open-File Report 2011-1268 (Buccola and Rounds, 2011). Those preliminary results are still valid, but the results in this report are more current and comprehensive.
Topping, David J.; Schmidt, John C.; Vierra, L.E.
2003-01-01
A gaging station has been operated by the U.S. Geological Survey at Lees Ferry, Arizona, since May 8, 1921. In March 1963, Glen Canyon Dam was closed 15.5 miles upstream, cutting off the upstream sediment supply and regulating the discharge of the Colorado River at Lees Ferry for the first time in history. To evaluate the pre-dam variability in the hydrology of the Colorado River, and to determine the effect of the operation of Glen Canyon Dam on the downstream hydrology of the river, a continuous record of the instantaneous discharge of the river at Lees Ferry was constructed and analyzed for the entire period of record between May 8, 1921, and September 30, 2000. This effort involved retrieval from the Federal Records Centers and then synthesis of all the raw historical data collected by the U.S. Geological Survey at Lees Ferry. As part of this process, the peak discharges of the two largest historical floods at Lees Ferry, the 1884 and 1921 floods, were reanalyzed and recomputed. This reanalysis indicates that the peak discharge of the 1884 flood was 210,000?30,000 cubic feet per second (ft3/s), and the peak discharge of the 1921 flood was 170,000?20,000 ft3/s. These values are indistinguishable from the peak discharges of these floods originally estimated or published by the U.S. Geological Survey, but are substantially less than the currently accepted peak discharges of these floods. The entire continuous record of instantaneous discharge of the Colorado River at Lees Ferry can now be requested from the U.S. Geological Survey Grand Canyon Monitoring and Research Center, Flagstaff, Arizona, and is also available electronically at http://www.gcmrc.gov. This record is perhaps the longest (almost 80 years) high-resolution (mostly 15- to 30-minute precision) times series of river discharge available. Analyses of these data, therefore, provide an unparalleled characterization of both the natural variability in the discharge of a river and the effects of dam operations on a river. Following the construction and quality-control checks of the continuous record of instantaneous discharge, analyses of flow duration, sub-daily flow variability, and flood frequency were conducted on the pre- and post-dam parts of the record. These analyses indicate that although the discharge of the Colorado River varied substantially prior to the closure of Glen Canyon Dam in 1963, operation of the dam has caused changes in discharge that are more extreme than the pre-dam natural variability. Operation of the dam has eliminated flood flows and base flows, and thereby has effectively 'flattened' the annual hydrograph. Prior to closure of the dam, the discharge of the Colorado River at Lees Ferry was lower than 7,980 ft3/s half of the time. Discharges lower than about 9,000 ft3/s were important for the seasonal accumulation and storage of sand in the pre-dam river downstream from Lees Ferry. The current operating plan for Glen Canyon Dam no longer allows sustained discharges lower than 8,000 ft3/s to be released. Thus, closure of the dam has not only cut off the upstream supply of sediment, but operation of the dam has also largely eliminated discharges during which sand could be demonstrated to accumulate in the river. In addition to radically changing the hydrology of the river, operation of the dam for hydroelectric-power generation has introduced large daily fluctuations in discharge. During the pre-dam era, the median daily range in discharge was only 542 ft3/s, although daily ranges in discharge exceeding 20,000 ft3/s were observed during the summer thunderstorm season. Relative to the pre-dam period of record, dam operations have increased the daily range in discharge during all but 0.1 percent of all days. The post-dam median daily range in discharge, 8,580 ft3/s, exceeds the pre-dam median discharge of 7,980 ft3/s. Operation of the dam has also radically changed the frequency of floods on the Colorado River at Lees Ferry. The frequency of f
NASA Astrophysics Data System (ADS)
Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.
2016-12-01
We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.
Buccola, Norman L.
2017-05-31
Green Peter and Foster Dams on the Middle and South Santiam Rivers, Oregon, have altered the annual downstream water temperature profile (cycle). Operation of the dams has resulted in cooler summer releases and warmer autumn releases relative to pre-dam conditions, and that alteration can hinder recovery of various life stages of threatened spring-run Chinook salmon (Oncorhyncus tshawytscha) and winter steelhead (O. mykiss). Lake level management and the use of multiple outlets from varying depths at the dams can enable the maintenance of a temperature regime more closely resembling that in which the fish evolved by releasing warm surface water during summer and cooler, deeper water in the autumn. At Green Peter and Foster Dams, the outlet configuration is such that temperature control is often limited by hydropower production at the dams. Previously calibrated CE-QUAL-W2 water temperature models of Green Peter and Foster Lakes were used to simulate the downstream thermal effects from hypothetical structures and modified operations at the dams. Scenarios with no minimum power production requirements allowed some releases through shallower and deeper outlets (summer and autumn) to achieve better temperature control throughout the year and less year-to-year variability in autumn release temperatures. Scenarios including a hypothetical outlet floating 1 meter below the lake surface resulted in greater ability to release warm water during summer compared to existing structures. Later in Autumn (October 15–December 31), a limited amount of temperature control was realized downstream from Foster Dam by scenarios limited to operational changes with existing structures, resulting in 15-day averages within 1.0 degree Celsius of current operations.
Development of probabilistic operating rules for Hluhluwe Dam, South Africa
NASA Astrophysics Data System (ADS)
Ndiritu, J.; Odiyo, J.; Makungo, R.; Mwaka, B.; Mthethwa, N.; Ntuli, C.; Andanje, A.
2017-08-01
Hluhluwe Dam, with a 30 million m3 reservoir that supplies water for irrigation and Hluhluwe municipality in Kwa-Zulu Natal Province, South Africa, was consistently experiencing low storage levels over several non-drought years since 2001. The dam was operated by rules of thumb and there were no records of water releases for irrigation - the main user of the dam. This paper describes an assessment of the historic behaviour of the reservoir since its completion in 1964 and the development of operating rules that accounted for: i) the multiple and different levels of reliability at which municipal and irrigation demands need to be supplied, and ii) inter-annual and inter-decadal variability of climate and inflows into the dam. The assessment of the behaviour of the reservoir was done by simulation assuming trigonometric rule curves that were optimized to maximize both yield and storage state using the SCE-UA method. The resulting reservoir behaviour matched the observed historic trajectory reasonably well and indicated that the dam has mainly been operated at a demand of 10 million m3/year until 2000 when the demand suddenly rose to 25 million m3/year. Operating rules were developed from a statistical analysis of the base yields from 500 simulations of the reservoir each using 5 year-long stochastically generated sequences of inflows, rainfall and evaporation. After the implementation of the operating rules in 2009, the storage state of the dam improved and matched those of other reservoirs in the region that had established operating rules.
Attitudes of Operative Dentistry Faculty toward Rubber Dam Isolation.
ERIC Educational Resources Information Center
Brackett, William W.; And Others
1989-01-01
Dental faculty responses (N=332) to a survey concerning use of rubber dams for excluding fluids from the working field in operative dentistry procedures indicated students receive adequate instruction in rubber dam use and are proficient at graduation, though motivating students to its use is problematic and patient resistance a factor. (MSE)
Dam pre-release as an important operation strategy in reducing flood impact in Malaysia
NASA Astrophysics Data System (ADS)
Hidayah Ishak, Nurul; Mustafa Hashim, Ahmad
2018-03-01
The 2014 flood was reported to be one of the worst natural disaster has ever affected several states in the northern part of Peninsular Malaysia. Overwhelming rainfall was noted as one of the main factors causing such impact, which was claimed to be unprecedented to some extent. The state of Perak, which is blessed with four cascading dams had also experienced flood damage at a scale that was considered the worst in history. The rainfall received had caused the dam to reach danger level that necessitated additional discharge to be released. Safety of the dams was of great importance and such unavoidable additional discharge was allowed to avoid catastrophic failure of the dam structures. This paper discusses the dam pre-release as a significant dam management strategy in reducing flood impact. An important balance between required dam storage to be maintained and the risk element that can be afforded is the crucial factor in such enhanced operation strategy. While further possibility in developing a carefully engineered dam pre-release strategy can be explored for dam operation in Malaysia, this has already been introduced in some developed countries. Australia and South Africa are examples where pre-release has been practiced and proven to reduce flood risk. The concept involves controlling the dam lake level throughout the year, in reference to the rainfall data and the hydrological properties for the catchment area of the dams. Plentiful data analysis need to be done in contemplation of producing the optimal pre-release model. The amount of heavy rainfalls received is beyond human control but the distribution of the discharge from the dams can be further managed with the appropriate pre-release strategy.
Buccola, Norman L.; Turner, Daniel F.; Rounds, Stewart A.
2016-09-14
Significant FindingsStreamflow and water temperature in the Middle Fork Willamette River (MFWR), western Oregon, have been regulated and altered since the construction of Lookout Point, Dexter, and Hills Creek Dams in 1954 and 1961, respectively. Each year, summer releases from the dams typically are cooler than pre-dam conditions, with the reverse (warmer than pre-dam conditions) occurring in autumn. This pattern has been detrimental to habitat of endangered Upper Willamette River (UWR) Chinook salmon (Oncorhynchus tshawytscha) and UWR winter steelhead (O. mykiss) throughout multiple life stages. In this study, scenarios testing different dam-operation strategies and hypothetical dam-outlet structures were simulated using CE-QUAL-W2 hydrodynamic/temperature models of the MFWR system from Hills Creek Lake (HCR) to Lookout Point (LOP) and Dexter (DEX) Lakes to explore and understand the efficacy of potential flow and temperature mitigation options.Model scenarios were run in constructed wet, normal, and dry hydrologic calendar years, and designed to minimize the effects of Hills Creek and Lookout Point Dams on river temperature by prioritizing warmer lake surface releases in May–August and cooler, deep releases in September–December. Operational scenarios consisted of a range of modified release rate rules, relaxation of power-generation constraints, variations in the timing of refill and drawdown, and maintenance of different summer maximum lake levels at HCR and LOP. Structural scenarios included various combinations of hypothetical floating outlets near the lake surface and hypothetical new outlets at depth. Scenario results were compared to scenarios using existing operational rules that give temperature management some priority (Base), scenarios using pre-2012 operational rules that prioritized power generation over temperature management (NoBlend), and estimated temperatures from a without-dams condition (WoDams).Results of the tested model scenarios led to the following conclusions:The existing outlets at Lookout Point Dam, because of the range of depths, allow for greater temperature control than the two existing outlets at Hills Creek Dam that are relatively deep.Temperature control at HCR through operational scenarios generally was minimal near Hills Creek Dam, but improved downstream toward the head of LOP when decreased release rates held HCR at a low lake elevation year-round.Inflows from unregulated streams between HCR and LOP helped to dilute the effects of HCR and achieve more natural stream temperatures before the MFWR entered LOP.The relative benefit of any particular scenario depended on the location in the MFWR system used to assess the potential change, with most scenarios involving changes to Hills Creek Dam being less effective with increasing downstream distance, such as downstream of DEX.To achieve as much temperature control as the most successful structural scenarios, which were able to resemble without-dam conditions for part of the year, most operational scenarios had to be free of any power-generation requirements at Lookout Point Dam.Downstream of DEX, scenarios incorporating a hypothetical floating outlet at either HCR or LOP resulted in similar temperatures, with both scenarios causing a delay in the estimated spring Chinook egg emergence by about 9–10 days compared to base-case temperature-management scenarios.
Geomorphic and Ecological Disturbance and Recovery from Two Small Dams and Their Removal
Tullos, Desirée D.; Finn, Debra S.; Walter, Cara
2014-01-01
Dams are known to impact river channels and ecosystems, both during their lifetime and in their decommissioning. In this study, we applied a before-after-control-impact design associated with two small dam removals to investigate abiotic and biotic recovery trajectories from both the elimination of the press disturbance associated with the presence of dams and the introduction of a pulse disturbance associated with removal of dams. The two case studies represent different geomorphic and ecological conditions that we expected to represent low and high sensitivities to the pulse disturbance of dam removal: the 4 m tall, gravel-filled Brownsville Dam on the wadeable Calapooia River and the 12.5 m tall, sand and gravel-filled Savage Rapids Dam on the largely non-wadeable Rogue River. We evaluated both geomorphic and ecological responses annually for two years post removal, and asked if functional traits of the macroinvertebrate assemblages provided more persistent signals of ecological disturbance than taxonomically defined assemblages over the period of study. Results indicate that: 1) the presence of the dams constituted a strong ecological press disturbance to the near-downstream reaches on both rivers, despite the fact that both rivers passed unregulated flow and sediment during the high flow season; 2) ecological recovery from this press disturbance occurred within the year following the restoration action of dam removal, whereas signals of geomorphic disturbance from the pulse of released sediment persisted two years post-removal, and 3) the strength of the press disturbance and the rapid ecological recovery were detected regardless of whether recovery was assessed by taxonomic or functional assemblages and for both case studies, in spite of their different geomorphic settings. PMID:25233231
Authorized and Operating Purposes of Corps of Engineers Reservoirs
1992-07-01
Puerto Rico CERRILLOS DAM AND RESERVOIR Jacksonville E-9O PORTUGUES DAM AND RESERVOIR Jacksonville E-92 South Carolina HARTWELL DAM AND LAKE Savannah E...LAKE Missouri Kansas City E-12 POMONA LAKE Kansas Kansas City E-12 PORTUGUES DAM AND RESERVOIR Puerto Rico Jacksonville E-92 PRADO DAM (SANTA ANA...PROJECT Florida Jacksonville E-92 PORTUGUES DAM AND RESERVOIR Puerto Rico Jacksonville E-92 RODMAN LOCK AND DAM (CROSS FLORIDA BARGE CANAL Florida
Classification of US hydropower dams by their modes of operation
McManamay, Ryan A.; Oigbokie, II, Clement O.; Kao, Shih -Chieh; ...
2016-02-19
A key challenge to understanding ecohydrologic responses to dam regulation is the absence of a universally transferable classification framework for how dams operate. In the present paper, we develop a classification system to organize the modes of operation (MOPs) for U.S. hydropower dams and powerplants. To determine the full diversity of MOPs, we mined federal documents, open-access data repositories, and internet sources. W then used CART classification trees to predict MOPs based on physical characteristics, regulation, and project generation. Finally, we evaluated how much variation MOPs explained in sub-daily discharge patterns for stream gages downstream of hydropower dams. After reviewingmore » information for 721 dams and 597 power plants, we developed a 2-tier hierarchical classification based on 1) the storage and control of flows to powerplants, and 2) the presence of a diversion around the natural stream bed. This resulted in nine tier-1 MOPs representing a continuum of operations from strictly peaking, to reregulating, to run-of-river, and two tier-2 MOPs, representing diversion and integral dam-powerhouse configurations. Although MOPs differed in physical characteristics and energy production, classification trees had low accuracies (<62%), which suggested accurate evaluations of MOPs may require individual attention. MOPs and dam storage explained 20% of the variation in downstream subdaily flow characteristics and showed consistent alterations in subdaily flow patterns from reference streams. Lastly, this standardized classification scheme is important for future research including estimating reservoir operations for large-scale hydrologic models and evaluating project economics, environmental impacts, and mitigation.« less
Classification of US hydropower dams by their modes of operation
DOE Office of Scientific and Technical Information (OSTI.GOV)
McManamay, Ryan A.; Oigbokie, II, Clement O.; Kao, Shih -Chieh
A key challenge to understanding ecohydrologic responses to dam regulation is the absence of a universally transferable classification framework for how dams operate. In the present paper, we develop a classification system to organize the modes of operation (MOPs) for U.S. hydropower dams and powerplants. To determine the full diversity of MOPs, we mined federal documents, open-access data repositories, and internet sources. W then used CART classification trees to predict MOPs based on physical characteristics, regulation, and project generation. Finally, we evaluated how much variation MOPs explained in sub-daily discharge patterns for stream gages downstream of hydropower dams. After reviewingmore » information for 721 dams and 597 power plants, we developed a 2-tier hierarchical classification based on 1) the storage and control of flows to powerplants, and 2) the presence of a diversion around the natural stream bed. This resulted in nine tier-1 MOPs representing a continuum of operations from strictly peaking, to reregulating, to run-of-river, and two tier-2 MOPs, representing diversion and integral dam-powerhouse configurations. Although MOPs differed in physical characteristics and energy production, classification trees had low accuracies (<62%), which suggested accurate evaluations of MOPs may require individual attention. MOPs and dam storage explained 20% of the variation in downstream subdaily flow characteristics and showed consistent alterations in subdaily flow patterns from reference streams. Lastly, this standardized classification scheme is important for future research including estimating reservoir operations for large-scale hydrologic models and evaluating project economics, environmental impacts, and mitigation.« less
State-discharge relations at dams on the Illinois and Des Plaines rivers in Illinois
Mades, Dean M.
1981-01-01
Stage-discharge relations were developed for the Brandon Road Dam on the Des Plainse River and the Dresden Island, Marseilles, Starved Rock, Peoria, and La Grange Dams on the Illinois River. At Brandon Road Dam, streamflow is regulated by the operation of tainter gates and headgates. Tainter gates are operated to regulate streamflow at the Dresden Island, Marseilles, and Starved Rock Dams. Peoria Dam and La Grange Dam comprise timber Chanoine wickets which are lowered to a horizontal position on the streambed when used for streamflow regulation. Both dams have concrete abutments housing butterfly valves that are also used for regulation. A total of 50 discharge measurements ranging from 49.0 to 2,450 cubic meter per second were used to determine discharge coefficients in equations expressing discharge as a function of headwater depth, tailwater depth, and gate opening. A stage-discharge relation for Chanoine wicket dams developed from a U.S. Army Corps of Engineers hydraulic model study in 1937 and 1938 was verified with discharge measurements made downstream from the Peoria and La Grange Dams. (USGS)
Major, Jon J.; Spicer, Kurt R.; Collins, Rebecca A.
2010-01-01
In 2007, Marmot Dam on the Sandy River, Oregon, was removed and a temporary cofferdam standing in its place was breached, allowing the river to flow freely along its entire length. Time-lapse imagery obtained from a network of digital single-lens reflex cameras placed around the lower reach of the sediment-filled reservoir behind the dam details rapid erosion of sediment by the Sandy River after breaching of the cofferdam. Within hours of the breaching, the Sandy River eroded much of the nearly 15-m-thick frontal part of the sediment wedge impounded behind the former concrete dam; within 24-60 hours it eroded approximately 125,000 m3 of sediment impounded in the lower 300-meter-reach of the reservoir. The imagery shows that the sediment eroded initially through vertical incision, but that lateral erosion rapidly became an important process.
1980-09-30
Classification 2I e. Ownership 2f. Purpose of Dam 2 g. Design and Construction History 2h. Normal Operating Procedure 2 1.3 PERTINENT DATA 2 a. Drainage...4 2.2 SUBSURFACE INVESTIGATION 4 2.3 DAM AND APPURTENANT STRUCTURES 4 2.4 CONSTRUCTION RECORDS 4 2.5 OPERATION RECORDS 2.6 EVALUATION OF DATA 5 4...12 a. Visual Observations 12 b. Design and Construction Data 12 c. Stability Analysis 12 d. Operating Records 13 e. Post- Construction Changes 13 f
Large-scale degradation of Amazonian freshwater ecosystems.
Castello, Leandro; Macedo, Marcia N
2016-03-01
Hydrological connectivity regulates the structure and function of Amazonian freshwater ecosystems and the provisioning of services that sustain local populations. This connectivity is increasingly being disrupted by the construction of dams, mining, land-cover changes, and global climate change. This review analyzes these drivers of degradation, evaluates their impacts on hydrological connectivity, and identifies policy deficiencies that hinder freshwater ecosystem protection. There are 154 large hydroelectric dams in operation today, and 21 dams under construction. The current trajectory of dam construction will leave only three free-flowing tributaries in the next few decades if all 277 planned dams are completed. Land-cover changes driven by mining, dam and road construction, agriculture and cattle ranching have already affected ~20% of the Basin and up to ~50% of riparian forests in some regions. Global climate change will likely exacerbate these impacts by creating warmer and dryer conditions, with less predictable rainfall and more extreme events (e.g., droughts and floods). The resulting hydrological alterations are rapidly degrading freshwater ecosystems, both independently and via complex feedbacks and synergistic interactions. The ecosystem impacts include biodiversity loss, warmer stream temperatures, stronger and more frequent floodplain fires, and changes to biogeochemical cycles, transport of organic and inorganic materials, and freshwater community structure and function. The impacts also include reductions in water quality, fish yields, and availability of water for navigation, power generation, and human use. This degradation of Amazonian freshwater ecosystems cannot be curbed presently because existing policies are inconsistent across the Basin, ignore cumulative effects, and overlook the hydrological connectivity of freshwater ecosystems. Maintaining the integrity of these freshwater ecosystems requires a basinwide research and policy framework to understand and manage hydrological connectivity across multiple spatial scales and jurisdictional boundaries. © 2015 John Wiley & Sons Ltd.
Computational hydraulics of a cascade of experimental-scale landside dam failures
NASA Astrophysics Data System (ADS)
Wright, N.; Guan, M.
2015-12-01
Abstract: Landslide dams typically comprise unconsolidated and poorly sorted material, and are vulnerable to rapid failure and breaching, particularly in mountainous areas during high intense rainfalls. A large flash flood with high-concentrated sediment can be formed in a short period, and the magnitude is likely to be amplified along the flow direction due to the inclusion of a large amount of sediment. This can result in significant and sudden flood risk downstream for human life and property. Numerous field evidence has indicated the various risks of landslide dam failures. In general, cascading landslide dams can be formed along the sloping channel due to the randomness and unpredictability of landslides, which complexes the hydraulics of landslide dam failures. The failure process of a single dam and subsequent floods has attracted attention in multidisciplinary studies. However, the dynamic failure process of cascading landslide dams has been poorly understood. From a viewpoint of simulation, this study evaluates the formation and development of rapid sediment-charged floods due to cascading failure of landslide dams through detailed hydro-morphodynamic modelling. The model used is based on shallow water theory and it has been successful in predicting the flow and morphological process during sudden dam-break, as well as full and partial dyke-breach. Various experimental-scale scenarios are modelled, including: (1) failure of a single full dam in a sloping channel, (2) failure of two dams in a sloping channel, (3) failure of multiple landslide dams (four) in a sloping channel. For each scenario, different failure modes (sudden/gradual) and bed boundary (fixed /mobile) are assumed and simulated. The study systematically explores the tempo-spatial evolution of landslide-induced floods (discharge, flow velocity, and flow concentration) and geomorphic properties along the sloping channel. The effects of in-channel erosion and flow-driven sediment from dams on the development of flood process are investigated. The results improve the understanding of the formation and development mechanism of flash floods due to cascading landslide dam failures. The findings are beneficial for downstream flood risk assessment and developing control strategies for landslide-induced floods.
1984-01-01
RIVER MISSOURI Report from September 1966 HARRY S. TROMAN DAM & RESERVOIR November 1979 OPERATION AND MAINTENANCE MANUAL 6 PERFORMING DRG. REPORT N4040E...Two of this report ) VII- I- xxiv ............................. .... ... .... ... . .2. . . OPERATION AND MAINTENANCE MANUAL HARRY S. TRUMAN DAM AND...RESERVOIR OSAGE RIVER, MISSOURI APPENDIX VII CONSTRUCTION FOUNDATION REPORT CHAPTER 1 INTRODUCTION 1-01. Location and Description of Project: Harry S
Is there enough sand? Evaluating the fate of Grand Canyon sandbars
Wright, S.A.; Schmidt, J.C.; Meles, T.S.; Topping, D.J.; Rubin, D.M.
2008-01-01
Large dams have the potential to dramatically alter the flow regime, geomorphology, and aquatic ecosystem of downstream river reaches. Development of flow release regimes in order to meet multiple objectives is a challenge facing dam operators, resource managers, and scientists. Herein, we review previous work and present new analyses related to the effects of Glen Canyon Dam on the downstream reach of the Colorado River in Marble and Grand Canyons. The dam traps the entire incoming sediment load in Lake Powell and modulates the hydrologic regime by, for example, eliminating spring snowmelt floods, resulting in changes in the geomorphology of the river downstream. The primary geomorphic impact has been the erosion of sandbars along the banks of the river. Recognition of this impact has led to many scientific studies and a variety of experimental operations of Glen Canyon Dam with the goal of rebuilding the eroding sandbars. These efforts have thus far been generally unsuccessful and the question remains as to whether or not the dam can be operated such that sandbars can be rebuilt and maintained over extended periods with the existing sediment supply. We attempt to answer this question by evaluating a dam operation that may be considered a "best-case scenario" for rebuilding and maintaining eroded sandbars. Our analysis suggests that this best-case scenario may indeed have viability for rebuilding sandbars, and that the initial rate at which sandbars could be rebuilt is comparable to the rate at which sandbars have been eroded since dam construction. The question remains open as to the viability of operations that deviate from the best-case scenario that we have defined.
Management plan for White Oak Dam. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ahmed, S.B.
1997-03-01
The purpose is to provide operation and maintenance, periodic inspection, and emergency action plans for White Oak Dam in general accordance with the Federal Emergency Management Agency (FEMA) guidelines for dam safety. It must be understood that operations at the site are primarily for purposes of environmental monitoring, environmental protection and waste management operations control. Effluent is generally allowed to flow from the lake at its natural rate by rising above the broad crested weir notch elevation of 744 feet m.s.l.
NASA Astrophysics Data System (ADS)
Wilcox, A. C.
2012-12-01
Two recent dam removals on tributaries to the Columbia River in the northwestern United States present contrasting examples of how dam removal methods, reservoir contents, and geomorphic settings influence system responses. The 2008 removal of Milltown Dam, from the Clark Fork River (CFR), Montana, and the 2011 removal of Condit Dam from the White Salmon River (WSR), Washington (Table 1), represent two of the largest dam removals to date. The Milltown Dam removal was notable because the dam stored millions of cubic meters of contaminated mine tailings, a portion of which were excavated as part of Superfund remediation but a portion of which flowed downstream after the removal. On the CFR, post-breach high flows in 2008 produced reservoir erosion and downstream deposition in bed interstices, along bars, and on the floodplain, but above-average (3-15 year recurrence interval) floods since then have remobilized this material and have, to a large extent, erased signs of downstream sedimentation. The Condit Dam removal entailed dynamiting of a 4m by 5.5m hole at the base of the dam, which produced rapid and dramatic draining of fine reservoir sediments within hours of the blast. Downstream of Condit Dam, the initial hyperconcentrated flows and sediment pulse draped the WSR with fine sediment, filled pools, and, in an unconfined reach influenced by the Columbia River's backwater, caused meters of aggradation and new bar formation. In the confined, bedrock-dominated reach downstream of the Condit site, pool-riffle structure has started to reemerge as of summer 2012 and the finest bed materials have been evacuated from the main channel, although sediment storage in pools and eddies persists. Whereas post-breach geomorphic responses on the CFR have been largely driven by hydrology, the post-breach evolution of the WSR has been predominantly influenced by antecedent geomorphic conditions (slope, confinement, and Columbia River backwater). On both the CFR and WSR, the pace of post-breach reservoir erosion and of geomorphic recovery from the disturbances produced by dam removal has been rapid, far exceeding pre-breach predictions.Table 1: Comparison of Milltown and Condit Dam removals
Code of Federal Regulations, 2011 CFR
2011-01-01
... Engineers, U.S. Army navigation lock and dam employees. 532.269 Section 532.269 Administrative Personnel... Determinations § 532.269 Special wage schedules for Corps of Engineers, U.S. Army navigation lock and dam... and dam equipment or who repair and maintain navigation lock and dam operating machinery and equipment...
NASA Astrophysics Data System (ADS)
Duvail, Stéphanie; Hamerlynck, Olivier; Paron, Paolo; Hervé, Dominique; Nyingi, Wanja D.; Leone, Michele
2017-10-01
The rivers flowing into the Western Indian Ocean have steep headwater gradients and carry high sediment loads. In combination with strong tides and seasonal rainfall, these rivers create dynamic deltas with biodiversity-rich and productive ecosystems that, through flooding, have sustained indigenous use systems for centuries. However, river catchments are rapidly changing due to deforestation. Hydropower dams also increasingly alter flood characteristics, reduce sediment supply and contribute to coastal erosion. These impacts are compounded by climate change. Altogether, these changes affect the livelihoods of the delta users. Here, based on prior works that we and others have conducted in the region, we analyse the drivers of these hydro-ecological changes. We then provide recommendations for improved dam design and operations to sustain the underlying delta-building processes, the ecosystem values and the needs of the users.
Beeman, John W.; Hansel, Hal C.; Hansen, Amy C.; Evans, Scott D.; Haner, Philip V.; Hatton, Tyson W.; Kofoot, Eric E.; Sprando, Jamie M.; Smith, Collin D.
2014-01-01
The in-reservoir movements and dam passage of individual juvenile Chinook salmon (Oncorhynchus tshawytscha) and juvenile steelhead (Oncorhynchus mykiss) were studied at Detroit Reservoir and Dam, near Detroit, Oregon, during 2012 and 2013. The goal of the study was to provide data to inform decisions about future downstream passage alternatives and factors affecting downstream passage rates with the existing dam configuration. In 2012, 468 juvenile Chinook salmon and 200 juvenile steelhead were tagged and released during a 3-month period in the spring, and another 514 juvenile Chinook salmon were tagged and released during a 3-month period in the fall. The fish were surgically implanted with a small acoustic transmitter with an expected life of about 3 months and a passive integrated transponder tag with an indefinite life, and were released into the two main tributaries several kilometers upstream of the reservoir. Juvenile Chinook salmon migrated from the release sites to the reservoir in a greater proportion than juvenile steelhead, but once in the reservoir, juvenile steelhead migrated to the forebay faster and had a higher dam passage rate than juvenile Chinook salmon. The routes available for passing water and fish varied throughout the year, with low reservoir elevations in winter and high reservoir elevations in summer in accordance with the flood-control purpose of the dam. Most dam passage was through the spillway during the spring and summer, when the reservoir elevation was high and the spillway and powerhouse were the most common routes in operation, and via the powerhouse during the fall and winter period, when the reservoir elevation was low and the regulating outlet and powerhouse were the most common routes in operation. Few tagged fish passed when the powerhouse was the only route in operation. Dam passage rates during the spring and summer were greatest at night, increased with dam discharge, and were greater when water was passed freely over the spillway compared to when it was controlled by the spillway Tainter gates. Dam passage rates during the fall and winter, when the reservoir elevation usually was too low for spillway operation, were lower than during the spring and summer, negatively related to reservoir elevation, and positively related to dam discharge, though the latter relation diminished as reservoir elevation decreased. Fish locations near the dam from estimates of three-dimensional positions often were near the locations of dam discharge and fish depths were surface oriented relative to the depth of the forebay. Fish passage rates with the existing dam configuration were greatest when the spillway was in operation and were lowest when the powerhouse was the only route in operation; the latter result may be related to the relatively low magnitude or variability in discharge during that condition. The available data suggest that a properly designed surface outlet could be a viable passage route for juvenile Chinook salmon and juvenile steelhead at Detroit Dam. A second year of data collection based on a similar study design was complete at the time of this report.
1980-06-01
for a small dam having a high hazard potential. Considering the small volume of water im- pounded and the downstream channel from the dam, one-half of...flood at damsite - Mr. Wesley Lee reported that the highest water he had seen was approximately 4 inches over the riser. (3) The principal spillway...operation. It was reported by Mr. Wesley Lee that the emergency spillway has never operated. 2.4 EVALUATION a. Availabilit X . The data in Appendix C
1984-01-01
PROJECT S TYPE OF REPORT & PERIOD COVEREDOSAGE RIVER BASIN ConStruction Foundation OSAGE RIVER MISSOURI Report from September 1966 HARRY S. TRUMAN DAM...OPERATION AND MAINTENANCE MANUAL HARRY S. TRUMAN DAM AND RESERVOIR OSAGE RIVER, MISSOURI APPENDIX VII CONSTRUCTION FOUNDATION REPORT VOLUME II TABLE OF...09r IWNI’(ANSAS CITY M?5OU ....... 11 1 O IA R, MISSOURI HARRY S TRUMA DAM & 1K5(V01 = CONSTRUCT"ON FOUNDATION REPORT IGEOLOGIC UNIT DESCRIPTIONS
Li, Jin Peng; Dong, Shi Kui; Peng, Ming Chun; Wu, Xuan; Zhou, Fang; Yu, Yin
2017-12-01
Benthic macroinvertebrate assemblages are one of the biological groups in aquatic ecosystem most sensitive to the habitat change and degradation, and can be a biological indicator for the aquatic ecosystem change and succession in cascading hydropower dam reservoir. The middle and lower reaches of the Lancang River are key spot for international biodiversity conservation and ecological studies on the effects of cascading hydropower dam exploitation. In this study, the reservoir of Manwan hydropower dam, the first dam in Lancang-Mekong river main stream, was selected as the study site. The benthic macroinvertebrate assemblages were sampled in 2011 and 2016 respectively. Meanwhile, the survey data before impounding (natural river, 1996) and early stage of single dam (1997) were collected to conduct the overall analysis for structure, distribution pattern and evolution of benthic macroinvertebrate assemblages. The results showed that the dominant biological group was gradually changed from the Oligochaeta and Insecta to the Mollusca. Along the longitudinal gradient, the density and biomass of the benthic macroinvertebrate assemblages were remarkably increased in reservoir, especially in the lacustrine zone. As for the functional feeding group, the predator and gatherer-collector changed into filter-collector predominantly in lacustrine zone. With the cascading dams operation, the biotic index indicated that the water quality of reservoir in 2016 was better than in 2011. The evolution of benthic macroinvertebrate assemblages in the Manwan Reservoir was related to the operation of Xiaowan dam in the upper reach, the hydrological regime and siltation in the reservoir, and would continue with dynamic changes with the operation of the cascading hydropower dam.
Inflow forecasting model construction with stochastic time series for coordinated dam operation
NASA Astrophysics Data System (ADS)
Kim, T.; Jung, Y.; Kim, H.; Heo, J. H.
2014-12-01
Dam inflow forecasting is one of the most important tasks in dam operation for an effective water resources management and control. In general, dam inflow forecasting with stochastic time series model is possible to apply when the data is stationary because most of stochastic process based on stationarity. However, recent hydrological data cannot be satisfied the stationarity anymore because of climate change. Therefore a stochastic time series model, which can consider seasonality and trend in the data series, named SARIMAX(Seasonal Autoregressive Integrated Average with eXternal variable) model were constructed in this study. This SARIMAX model could increase the performance of stochastic time series model by considering the nonstationarity components and external variable such as precipitation. For application, the models were constructed for four coordinated dams on Han river in South Korea with monthly time series data. As a result, the models of each dam have similar performance and it would be possible to use the model for coordinated dam operation.Acknowledgement This research was supported by a grant 'Establishing Active Disaster Management System of Flood Control Structures by using 3D BIM Technique' [NEMA-NH-12-57] from the Natural Hazard Mitigation Research Group, National Emergency Management Agency of Korea.
Skalak, Katherine; Benthem, Adam J.; Schenk, Edward R.; Hupp, Cliff R.; Galloway, Joel M.; Nustad, Rochelle A.; Wiche, Gregg J.
2013-01-01
The Missouri River has had a long history of anthropogenic modification with considerable impacts on river and riparian ecology, form, and function. During the 20th century, several large dam-building efforts in the basin served the needs for irrigation, flood control, navigation, and the generation of hydroelectric power. The managed flow provided a range of uses, including recreation, fisheries, and habitat. Fifteen dams impound the main stem of the river, with hundreds more on tributaries. Though the effects of dams and reservoirs are well-documented, their impacts have been studied individually, with relatively little attention paid to their interaction along a river corridor. We examine the morphological and sedimentological changes in the Upper Missouri River between the Garrison Dam in ND (operational in 1953) and Oahe Dam in SD (operational in 1959). Through historical aerial photography, stream gage data, and cross sectional surveys, we demonstrate that the influence of the upstream dam is still a major control of river dynamics when the backwater effects of the downstream reservoir begin. In the “Anthropocene”, dams are ubiquitous on large rivers and often occur in series, similar to the Garrison Dam Segment. We propose a conceptual model of how interacting dams might affect river geomorphology, resulting in distinct and recognizable morphologic sequences that we term “Inter-Dam sequence” characteristic of major rivers in the US.
Sluiceway Operations to Pass Juvenile Salmonids at The Dalles Dam, Columbia River, USA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Gary E.; Khan, Fenton; Skalski, J. R.
Existing ice and trash sluiceways are commonly used to pass juvenile salmonids downstream at hydropower dams through a benign, non-turbine route. At The Dalles Dam on the Columbia River, managers undertook optimizing operations of sluiceway weirs to maximize survival of juvenile salmonids at the powerhouse. We applied fixed-location hydroacoustic methods to compare fish passage rates and sluiceway efficiencies for two weir configurations during 2004 and 2005: three weirs versus six weirs, located at the mid- versus east powerhouse, respectively. We also analyzed horizontal distributions of passage at the sluiceway and turbines and the effects of operating turbines beneath open sluicewaymore » gates to provide supporting data relevant to operations optimization. Based on the findings, we recommend the following for long-term operations for the sluiceway at The Dalles Dam: open six rather than three sluiceway weirs to take advantage of the maximum hydraulic capacity of the sluiceway; open the three weirs above the western-most operating main turbine unit (MU) and the three weirs at MU 8 where turbine passage rates are relatively high; operate the turbine units below open sluiceway weirs as a standard procedure; operate the sluiceway 24 h/d year-round to maximize its benefits to juvenile salmonids; and use the same operations for spring and summer emigrants. These operational concepts are transferable to dams where sluiceway surface flow outlets are used protect downstream migrating fishes.« less
Taming the Des Moines Rapids: The Background of Lock 19
1978-06-01
dams had been proposed at various locations, but none had ever been built. Joseph Smith and his Mormon followers at Nauvoo, Il- linois, at the head...of the rapids, had planned to build such a dam for power and navigation pur- poses in 1844, but Smith was killed and his follow- ers left for Utah...opened at 8 a.m., the Lachlan Macleay of the Federal Barge Lines entered the lock, greeted by only a handful of District employees. The tow of seven
Beeman, J.W.; Braatz, A.C.; Hansel, H.C.; Fielding, S.D.; Haner, P.V.; Hansen, G.S.; Shurtleff, D.J.; Sprando, J.M.; Rondorf, D.W.
2010-01-01
This report describes a study of dam passage and survival of radio-tagged juvenile salmonids after installation of a temporary spillway weir (TSW) at Little Goose Dam, Washington, in 2009. The purpose of the study was to document fish passage and survival when the dam was operated with the TSW in place. Spillway weirs are one of several methods used to improve downstream passage of juvenile salmonids. Each spillway weir design is based on the concept of providing an overflow weir with a depth more similar to the natural migration depth of juvenile salmonids than conventional spill bays. Little Goose Dam was the last of the four lower Snake River dams to have a spillway weir installed. This was the first year that some form of surface passage device was operating at all Snake River and Columbia River dams between Lewiston, Idaho, and the Columbia River estuary. The study design stipulated that a total of 30 percent of the river discharge would continuously be passed over the TSW and the conventional spill bays, and this percentage was achieved. The TSW also was to be operated at the 'low crest' elevation during the spring and the 'high crest' elevation during the summer, but the TSW was only operated at the low crest elevation during this study. Behavior, passage, and survival of spring and summer juvenile salmonid migrants passing through Little Goose Dam were examined using radio telemetry. Survival was estimated using the Route Specific Survival Model (RSSM) by releasing tagged fish near Central Ferry State Park 21 kilometers upstream of the dam and in the tailrace approximately 0.5 kilometer downstream of the dam. From April 18 to May 21, 2009, 1,520 yearling Chinook salmon (Oncorhynchus tshawytscha) and 1,517 juvenile steelhead (O. mykiss) were radio tagged and released. From June 6 to July 5, 2009, 4,251 subyearling Chinook salmon (O. tshawytscha) were radio tagged and released. Release dates of subyearling Chinook salmon were selected to avoid 'reservoir-type' fish that cease to migrate around July. Detection sites were installed in the forebay 2 kilometers upstream of the dam, on the dam, and at several sites downstream. Detection equipment was operated from April 18 to June 5, 2009, and from June 6 to July 6, 2009, hereinafter referred to as the study periods. We describe passage behaviors through the forebay, main passage routes, and tailrace, survival probabilities through the pool (release to the forebay) and forebay and passage and survival probabilities through the main passage routes (TSW, conventional spill bays, turbines, juvenile bypass), and survival passing the concrete (the dam itself) and the dam (concrete plus the forebay).
Sensitivity of Water-Energy Nexus to dam operation: A Water-Energy Productivity concept.
Basheer, Mohammed; Elagib, Nadir Ahmed
2018-03-01
Understanding and modelling the complex nature of interlinkages between water and energy are essential for efficient use of the two resources. Hydropower storage dams represent an interesting example of the water-energy interdependencies since they are often multipurpose. The concept of Water-Energy Productivity (WEP), defined as the amount of energy produced per unit of water lost in the process, is introduced in this study to illustrate the relationship between energy generation and water losses by examining the sensitivity of the Water-Energy Nexus (WEN) to changing dam operation policy. This concept is demonstrated by developing a water allocation model of the White Nile in Sudan, including Jebel Aulia Dam (JAD), using a general river and reservoir simulation software called RiverWare. A number of 77 operation scenarios of JAD are examined for 30 hydrologic years (1980-2009), considering reducing the Full Supply Level (FSL) gradually from its current value to the minimum possible value, increasing the Minimum Operating Level (MOL) gradually to the maximum possible level, and operating the dam at a Constant Operating Level (COL). The results show that raising the operating level does not necessarily increase the WEP. In comparison to the current policy, the analysis shows that a maximum WEP of 32.6GWh/BCM (GWh/Billion Cubic Meters) would be reached by raising the MOL to 375masl (meters above sea level), resulting in an increase in average annual energy generation to 164.6GWh (+18.1%) at the expense of an annual water loss of 5.05BCM (+12.7%). Even though this operation policy results in a more efficient water use compared to the original operation policy, a basin-wide assessment that includes all hydropower storage dams in the Nile basin should be conducted to decide on where and how much energy should be generated. The present analysis and future examination of the multi-dimensions of the WEN in the context of dam operation are imperative to improve the decision making in the quest for efficient resource use and management. Copyright © 2017 Elsevier B.V. All rights reserved.
30 CFR 717.18 - Dams constructed of or impounding waste material.
Code of Federal Regulations, 2011 CFR
2011-07-01
... shall design, locate, construct, operate, maintain, modify, and abandon or remove all dams (used either... design. (ix) A permanent identification marker, at least 6 feet high that shows the dam number assigned... located on or immediately adjacent to each dam within 30 days of certification of design pursuant to this...
33 CFR 208.28 - Foss Dam and Reservoir, Washita River, Oklahoma.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Foss Dam and Reservoir, Washita... THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.28 Foss Dam and Reservoir, Washita River, Oklahoma. The Bureau of Reclamation shall operate the Foss Dam and Reservoir in the interest of...
33 CFR 208.82 - Hetch Hetchy, Cherry Valley, and Don Pedro Dams and Reservoirs.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Don Pedro Dams and Reservoirs. 208.82 Section 208.82 Navigation and Navigable Waters CORPS OF..., Cherry Valley, and Don Pedro Dams and Reservoirs. The Turlock Irrigation District and Modesto Irrigation District, acting jointly, hereinafter called the Districts, shall operate Don Pedro Dam and Reservoir in...
33 CFR 208.82 - Hetch Hetchy, Cherry Valley, and Don Pedro Dams and Reservoirs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Don Pedro Dams and Reservoirs. 208.82 Section 208.82 Navigation and Navigable Waters CORPS OF..., Cherry Valley, and Don Pedro Dams and Reservoirs. The Turlock Irrigation District and Modesto Irrigation District, acting jointly, hereinafter called the Districts, shall operate Don Pedro Dam and Reservoir in...
33 CFR 208.28 - Foss Dam and Reservoir, Washita River, Oklahoma.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Foss Dam and Reservoir, Washita... THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.28 Foss Dam and Reservoir, Washita River, Oklahoma. The Bureau of Reclamation shall operate the Foss Dam and Reservoir in the interest of...
Sluiceway Operations for Adult Steelhead Downstream Passage at The Dalles Dam, Columbia River, USA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Khan, Fenton; Royer, Ida M.; Johnson, Gary E.
2013-10-01
This study evaluated adult steelhead (Oncorhynchus mykiss; fallbacks and kelts) downstream passage at The Dalles Dam in the Columbia River, USA, during the late fall, winter, and early spring months between 2008 and 2011. The purpose of the study was to determine the efficacy of operating the dam’s ice-and-trash sluiceway during non-spill months to provide a relatively safe, non-turbine, surface outlet for overwintering steelhead fallbacks and downstream migrating steelhead kelts. We applied the fixed-location hydroacoustic technique to estimate fish passage rates at the sluiceway and turbines of the dam. The spillway was closed during our sampling periods, which generally occurredmore » in late fall, winter, and early spring. The sluiceway was highly used by adult steelhead (91–99% of total fish sampled passing the dam) during all sampling periods. Turbine passage was low when the sluiceway was not operated. This implies that lack of a sluiceway route did not result in increased turbine passage. However, when the sluiceway was open, adult steelhead used it to pass through the dam. The sluiceway may be operated during late fall, winter, and early spring to provide an optimal, non-turbine route for adult steelhead (fallbacks and kelts) downstream passage at The Dalles Dam.« less
1981-09-01
01546 NAME OF DAM: Farm Brook Site 2A Darn TO4N: Hamden COUNTY AND STATE: New Haven County, Connecticut STREAM: Wilmot Brook *DATE OF INSPECTION...few lives. Therefore, an emergency operation plan, including a downstream warning system should be prepared and implemented. It is recommended that...3.2 Evaluation 3-4 4. OPERATIONAL & MAINTENANCE PROCEDURES - 4.1 Operational Procedures 4-1 a. General b. Description of any Warning System in Effect
1980-04-01
CARNEY M. TERZIAN, HENBER I Design Branch Engineering Division RICHARD DIB * Water Control Branch Engineering Division [ hPIPWVAL 220ininu: Chief...2 f. Operator 2 I g. Purpose of Dam 2 h. Design and Construction History 2 i. Normal Operational Procedure 2 1.3 Pertinent Data 2 a. Drainage...i. Spillway 5 J. Regulating Outlets 5 [I h] Section Page 2. ENGINEERING DATA 6 2.1 Design Data 6 2.2 Construction Data 6 2.3 Operation Data 6 2.4
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bellendir, E. N.; Gordon, L. A., E-mail: lev-gordon@mail.ru; Khrapkov, A. A.
Current studies of the stress-strain state of the dam at the Sayano-Shushenskaya Hydroelectric Power Plant at VNIIG based on mathematical modeling including full scale and experimental data are described. Applications and programs intended for automatic operational evaluation of the stress-strain state of the dam for optimizing control of the upper race level in the course of the annual filling-drawdown cycle and during seismic events are examined. Improvements in systems for monitoring the stress-strain state of concrete dams are proposed.
77 FR 51993 - Western Technical College; Notice of Availability of Environmental Assessment
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-28
... hydroelectric generation at the dam. The dam is operated manually in a run-of-river mode (i.e., an operating...) distribution line; and (5) appurtenant facilities. The project would be operated in a run-of-river mode using... could otherwise enter project waters or adjacent non-project lands; Operating the project in a run-of...
1978-08-01
operates to pump water from Settling Basin to Filter * Float Wells Beds above the location of Ludlow Dam. Crane Hoist Elevator Hydraulic Systum Service...outlet Channel beyond Emergency Spillway at Cherry Valley Dam Overflow StutueoBra ro aa atryVe Photogaph #1 P 0 Photograph #12 Contrls forw Slif Gaes ate
NASA Astrophysics Data System (ADS)
Dai, A.; Saito, L.; Sapin, J. R.; Rajagopalan, B.; Hanna, R. B.; Kauneckis, D. L.
2014-12-01
Chinook salmon populations have declined significantly after the construction of Shasta Dam on the Sacramento River in 1945 prevented them from spawning in the cold waters upstream. In 1994, the winter-run Chinook were listed under the Endangered Species Act and 3 years later the US Bureau of Reclamation began operating a temperature control device (TCD) on the dam that allows for selective withdrawal for downstream temperature control to promote salmon spawning while also maximizing power generation. However, dam operators are responsible to other interests that depend on the reservoir for water such as agriculture, municipalities, industry, and recreation. An increase in temperatures due to climate change may place additional strain on the ability of dam operations to maintain spawning habitat for salmon downstream of the dam. We examined the capability of Shasta Dam to regulate downstream temperatures under extreme climates and climate change by using stochastically generated streamflow, stream temperature, and weather inputs with a two-dimensional CE-QUAL-W2 model under several operational options. Operation performance was evaluated using degree days and cold pool volume (volume of water below a temperature threshold). Model results indicated that a generalized operations release schedule, in which release elevations varied over the year to match downstream temperature targets, performed best overall in meeting temperature targets while preserving cold pool volume. Releasing all water out the bottom throughout the year tended to meet temperature targets at the expense of depleting the cold pool, and releasing all water out uppermost gates preserved the cold pool, but released water that was too warm during the critical spawning period. With higher air temperatures due to climate change, both degree day and cold pool volume metrics were worse than baseline conditions, which suggests that Chinook salmon may be more negatively affected under climate change.
Delistraty, Damon; Yokel, Jerry
2007-01-01
Columbia River sediments were characterized (metals, organics, porewater toxicity) with samples (n=12) from four dams below the Hanford site. Analyses were supplemented with colocated radionuclide data, along with comparable data from the Priest Rapids dam, immediately upriver from Hanford. Although not statistically significant (Bonferroni P>0.05), metals were generally highest at Priest Rapids, relative to downriver dams. Semivolatiles, Aroclors, and organochlorine pesticides were below method reporting limits. Radionuclide differences across locations were minor (Bonferroni P>0.05). Whereas Microtox showed little toxicity, Daphnia IQ tests exhibited measurable toxicity at all locations (EC50 = 22 - 78% porewater). Ecotoxicological benchmarks for metals were exceeded at several locations, most notably at Priest Rapids. Except for K-40, radionuclides were below benchmarks. Overall, chemistry and ecotoxicity results suggested that sediments may pose a risk to benthic biota, likely due to metals (derived largely from upriver mining) or factors associated with a reducing environment (e.g., low oxygen, high ammonia).
Webb, Robert H.; Melis, Theodore S.; Wise, Thomas W.; Elliott, John G.
1996-01-01
Lava Falls Rapid is the most formidable reach of whitewater on the Colorado River in Grand Canyon and is one of the most famous rapids in the world. Although the rapid was once thought to be controlled by the remnants of lava dams of Pleistocene age, Lava Falls was created and is maintained by frequent debris flows from Prospect Canyon. We used 232 historical photographs, of which 121 were replicated, and 14C and 3He dating methods to reconstruct the ages and, in some cases, the magnitudes of late Holocene debris flows. We quantified the interaction between Prospect Canyon debris flows and the Colorado River using image processing of the historical photographs. The highest and oldest debris-flow deposits on the debris fan yielded a 3He date of 2.9?0.6 ka (950 BC), which indicates predominately late Holocene aggradation of one of the largest debris fans in Grand Canyon. The deposit, which has a 25-m escarpment caused by river reworking, crossed the Colorado River and raised its base level by 30 m for an indeterminate, although probably short, period. We mapped depositional surfaces of 6 debris flows that occurred after 950 BC. The most recent prehistoric debris flow occurred no more than 500 years ago (AD 1434). From April 1872 to July 1939, no debris flows occurred in Prospect Canyon. Debris flows in 1939, 1954, 1955, 1963, 1966, and 1995 constricted the Colorado River between 35 and 80 percent and completely changed the pattern of flow through the rapid. The debris flows had discharges estimated between about 290 and 1,000 m3/s and transported boulders as heavy as 30 Mg. The recurrence interval of these debris flows, calculated from the volume of the aggraded debris fan, ranged from 35 to 200 yrs. The 1939 debris flow in Prospect Canyon appears to have been the largest debris flow in Grand Canyon during the last 125 years. Debris flows in Prospect Canyon are initiated by streamflow pouring over a 325-m waterfall onto unconsolidated colluvium, a process called the firehose effect. Floods in Prospect Valley above the waterfall are generated during regional winter storms, localized summer thunderstorms, and occasional tropical cyclones. Winter precipitation has increased in the Grand Canyon region since the early 1960s, and the most recent debris flows have occurred during winter storms. Summer rainfall has declined in the same period, decreasing the potential for debris flows in the summer months. The history of river reworking of the Prospect Canyon debris fan illustrates the interrelation between tributary debris fans and mainstem floods in bedrock canyons. Lava Falls Rapid did not change despite Colorado River floods of 8,500 m3/s in 1884 and 6,230 m3/s in 1921. Floods up to 3,540 m3/s that occurred after the historical, pre-dam debris flows removed most of the deposits within 3 years. Releases in 1965 from Glen Canyon Dam that were above powerplant capacity but less than 1,640 m3/s removed most of the debris fan deposited in 1963, and the combination of dam releases and a 1973 flood on the Little Colorado River removed the 1966 aggradation. About 4,800 m3 of the 1995 deposit was reworked on the day of the 1995 debris flow, dam releases of less than 570 m3/s had not reworked the remainder of the aggraded debris fan. Lava Falls Rapid has been the most unstable reach of whitewater in Grand Canyon during the late Holocene and particularly during the last 120 years. Rapids in bedrock canyons controlled by tributary deposition in the main channel are aggradational features that reflect the net effect of tributary-mainstem interactions. Boulders that form the core of rapids in Grand Canyon are essentially immobile by both regulated and unregulated Colorado River flows. Historical operation of Glen Canyon Dam, which was completed in 1963, has reduced the potential for reworking of debris fans, and has accelerated the rate of net aggradation at the mouths of tributary canyons. Because debris fans that formed after 196
Evans, Scott D.; Walker, Christopher E.; Brewer, Scott J.; Adams, Noah S.
2010-01-01
Few studies have evaluated survival of juvenile salmon over long river reaches in the Columbia River and information regarding the survival of sockeye salmon at lower Columbia River dams is lacking. To address these information gaps, the U.S. Geological Survey was contracted by the U.S. Army Corps of Engineers to evaluate the possibility of using tagged fish released in the Mid-Columbia River to assess passage and survival at and downstream of McNary Dam. Using the acoustic telemetry systems already in place for a passage and survival study at McNary Dam, fish released from the tailraces of Wells, Rocky Reach, Rock Island, Wanapum, and Priest Rapids Dams were detected at McNary Dam and at the subsequent downstream arrays. These data were used to generate route-specific survival probabilities using single-release models from fish released in the Mid-Columbia River. We document trends in passage and survival probabilities at McNary Dam for yearling Chinook and sockeye salmon and juvenile steelhead released during studies in the Mid-Columbia River. Trends in the survival and passage of these juvenile salmonid species are presented and discussed. However, comparisons made across years and between study groups are not possible because of differences in the source of the test fish, the type of acoustic tags used, the absence of the use of passive integrated transponder tags in some of the release groups, differences in tagging and release protocols, annual differences in dam operations and configurations, differences in how the survival models were constructed (that is, number of routes that could be estimated given the number of fish detected), and the number and length of reaches included in the analysis (downstream reach length and arrays). Despite these differences, the data we present offer a unique opportunity to examine the migration behavior and survival of a group of fish that otherwise would not be studied. This is particularly true for sockeye salmon because little information is available about their survival as they pass hydroelectric dams in the lower Columbia River. Collecting information on fish released in the Mid-Columbia River, as well as on fish released 8 kilometers upstream of McNary Dam, allowed us to evaluate similarities and differences in passage and survival probabilities. In general, juvenile salmonids released in the Mid-Columbia River and detected at and downstream of McNary Dam showed trends in passage and survival probabilities that were similar to fish released 8 kilometers upstream of McNary Dam. This suggests that increased migration time or length of migration had little effect on behavior and survival of Mid-Columbia River released juvenile salmonids detected at McNary Dam.
43 CFR 418.23 - Diversion of Rock Dam Ditch water.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Diversion of Rock Dam Ditch water. 418.23... Operations and Management § 418.23 Diversion of Rock Dam Ditch water. Project water may be diverted directly to Rock Dam Ditch from the Truckee Canal only when diversions cannot be made from the outlet works of...
43 CFR 418.23 - Diversion of Rock Dam Ditch water.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Diversion of Rock Dam Ditch water. 418.23... Operations and Management § 418.23 Diversion of Rock Dam Ditch water. Project water may be diverted directly to Rock Dam Ditch from the Truckee Canal only when diversions cannot be made from the outlet works of...
43 CFR 418.23 - Diversion of Rock Dam Ditch water.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Diversion of Rock Dam Ditch water. 418.23... Operations and Management § 418.23 Diversion of Rock Dam Ditch water. Project water may be diverted directly to Rock Dam Ditch from the Truckee Canal only when diversions cannot be made from the outlet works of...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... Competing Applications; Kachess Dam Hydropower, LLC On May 31, 2011, Kachess Dam Hydropower, LLC filed an... study the feasibility of the Kachess Dam Hydroelectric Project (project) to be located at Kachess Reservoir dam, owned and operated by the U.S. Bureau of Reclamation near Cle Elum and Roslyn in Kittitas...
Risk Perception Analysis Related To Existing Dams In Italy
NASA Astrophysics Data System (ADS)
Solimene, Pellegrino
2013-04-01
In the first part of this work, the progress of Italian National Rules about dams design, construction and operation are presented to highlight the strong connection existing between the promulgation of new decrees, as a consequence of a dam accidents, and the necessity to prevent further loss of lives and goods downstream. Following the Gleno Dam failure (1923), a special Ministerial Committee wrote out the first Regulations and made the proposal to establish, within the High Council of Public Works, a special department that become soon the "Dam Service", with the tasks of control and supervision about construction and operation phases of the dams and their reservoirs. A different definition of tasks and the structure of Dam Service were provided in accordance with law n° 183/1989, which transferred all the technical services to the Office of the Prime Minister; the aim was to join the Dam Office with the Department for National Technical Services, with the objective of increasing the knowledge of the territory and promoting the study on flood propagation downstream in case of operations on bottom outlet or hypothetical dam-break. In fact, population living downstream is not ready to accept any amount of risk because has not a good knowledge of the efforts of experts involved in dam safety, both from the operators and from the safety Authority. So it's important to optimize all the activities usually performed in a dam safety program and improve the emergency planning as a response to people's primary needs and feeling about safety from Civil Protection Authority. In the second part of the work, a definition of risk is provided as the relationship existing between probability of occurrence and loss, setting out the range within to plan for prevention (risk mitigation), thanks to the qualitative assessment of the minimum safety level that is suited to assign funds to plan for Civil Protection (loss mitigation). The basic meaning of the reliability of a zoned earthfill dam is illustrated by defining the risk analysis during its construction and operation. A qualitative "Event Tree Analysis" makes clear with an example the probability of occurrence of the events triggered by an earthquake, and leads to a classification of the damage level. Finally, a System Dynamics (SD) approach is presented to investigate possibilities of a preventive planning in relationship to the risk, so that it's possible to establish shared procedures to achieve the correct management in any crisis phase. As a qualitative result of a SD application, figure 1 presents a flow-chart about a case study on the same dam so to illustrate the emergency planning in a step by step procedure according to the Regulations.
NASA Astrophysics Data System (ADS)
Wild, T. B.; Reed, P. M.; Loucks, D.
2016-12-01
The Mekong River basin in Southeast Asia is one of several river basins with exceptionally high biodiversity value where intensive hydropower dam development is anticipated. In the Mekong basin, over 100 dams are planned to be constructed in the next 20-30 years. As planned, these dams will alter the river's natural water, sediment and nutrient flows, and will fragment fish migration pathways. In doing so, they will degrade one of the world's most productive freshwater fish habitats, upon which some 60 million people depend for food and income security. For those dams that have not yet been constructed, there still exist opportunities to modify their siting, design and operation (SDO) to achieve a more balanced set of tradeoffs among hydropower production, sediment/nutrient passage and adult fish/larvae passage. We present a successful case study wherein we explored such alternative SDO opportunities in partnership with the Government of Cambodia for Sambor Dam, planned to be built on the main stem of the Mekong. Sambor would be one of the world's longest dams, spanning 18 km across the river just upstream of (1) Tonle Sap Lake, which supplies 70% of Cambodians' protein, and (2) the Mekong Delta in Vietnam, responsible for 50% of Vietnam's rice production. We will describe key dam siting and design modifications required to mitigate ecological impacts. We will then focus on the most promising alternative dam siting/design concept, exploring the reservoir operations space to demonstrate that a complex set of tradeoffs exist among a diverse set of energy and ecosystem objectives. Results indicate that even for a hydrologically small reservoir, a wide array of potential reservoir operating policies exist that have vastly different food-energy implications. While some policies would significantly mitigate ecological impacts, many policies exist that would pose a severe threat to the sustainability of the fishery. Failure to sample the reservoir operations space at appropriate resolution could result in failure to accurately identify tradeoffs and vulnerabilities. We explore energy-ecosystem tradeoffs while demonstrating to stakeholders the impacts of transitioning from their initial deterministic analysis that largely focused on energy revenue to broader many-objective stochastic problem formulations.
Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2002 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
DeHart, Michele; Berggren, Thomas J.; Filardo, Margaret
2003-09-01
The runoff volumes in 2002 were near average for the January to July period above Lower Granite Dam (80%) and The Dalles Dam (97%). The year 2002 hydrosystem operations and runoff conditions resulted in flows that were less than the seasonal Biological Opinion (Opinion) flow objectives at Lower Granite Dam for both the spring and summer period. The seasonal flow objectives for Priest Rapids and McNary dams were exceeded for the spring period, but at McNary Dam summer flow objectives were not met. While seasonal flow objectives were exceeded for the spring at McNary Dam, the 2002 season illustrated thatmore » Biological Opinion management to seasonal flow targets can result in conditions where a major portion of the juvenile fish migration migrates in conditions that are less than the flow objectives. The delay in runoff due to cool weather conditions and the inability of reservoirs to augment flows by drafting lower than the flood control elevations, resulted in flows less than the Opinion objectives until May 22, 2002. By this time approximately 73% of the yearling chinook and 56% of steelhead had already passed the project. For the most part, spill in 2002 was managed below the gas waiver limits for total dissolved gas levels and the NMFS action criteria for dissolved gas signs were not exceeded. The exception was at Lower Monumental Dam where no Biological Opinion spill occurred due to the need to conduct repairs in the stilling basin. Survival estimates obtained for PIT tagged juveniles were similar in range to those observed prior to 2001. A multi-year analysis of juvenile survival and the factors that affect it was conducted in 2002. A water transit time and flow relation was demonstrated for spring migrating chinook and steelhead of Snake River and Mid Columbia River origin. Returning numbers of adults observed at Bonneville Dam declined for spring chinook, steelhead and coho, while summer and fall chinook numbers increased. However, all numbers were far greater than observed in the past ten years averaged together. In 2002, about 87 million juvenile salmon were released from Federal, State, Tribal or private hatcheries into the Columbia River Basin above Bonneville Dam. This represents an increase over the past season, when only 71 million juvenile fish were released into the same area.« less
Buccola, Norman L.; Stonewall, Adam J.; Rounds, Stewart A.
2015-01-01
Estimated egg-emergence days for endangered Upper Willamette River Chinook salmon (Oncorhynchus tshawytscha) and Upper Willamette River winter steelhead (Oncorhynchus mykiss) were assessed for all scenarios. Estimated spring Chinook fry emergence under SlidingWeir scenarios was 9 days later immediately downstream of Big Cliff Dam, and 4 days later at Greens Bridge compared with existing structural scenarios at Detroit Dam. Despite the inclusion of a hypothetical sliding weir at Detroit Dam, temperatures exceeded without-dams temperatures during November and December. These late-autumn exceedances likely represent the residual thermal effect of Detroit Lake operated to meet minimum dry-season release rates (supporting instream habitat and irrigation requirements) and lake levels specified by the current (2014) operating rules (supporting recreation and flood mitigation).
Large-scale degradation of Amazonian freshwater ecosystems
NASA Astrophysics Data System (ADS)
Castello, L.; Macedo, M.
2016-12-01
The integrity of freshwater ecosystems depends on their hydrological connectivity with land, water, and climate systems. Hydrological connectivity regulates the structure and function of Amazonian freshwater ecosystems and the provisioning of services that sustain local populations. However, the hydrological connectivity of Amazonian freshwater ecosystems is increasingly disrupted by construction of dams, mining, land-cover changes, and global climate change. This review analyzes these drivers of degradation; evaluates their impacts on hydrological connectivity; and identifies policy deficiencies that hinder freshwater ecosystem protection. There are 155 large hydroelectric dams in operation, 21 dams under construction, and there will be only three free-flowing tributaries if all 277 planned dams for the Basin are built. Land-cover changes driven by mining, dam and road construction, and agriculture and cattle ranching have already affected 20% of the Basin and up to 50% of riparian forests in some regions. Global climate change will likely exacerbate these impacts by creating warmer and dryer conditions, with less predictable rainfall and more extreme events (e.g. droughts and floods). The resulting hydrological alterations are rapidly degrading freshwater ecosystems both independently and via complex feedbacks and synergistic interactions. The ecosystem impacts include biodiversity loss, warmer stream temperatures, stronger and more frequent floodplain fires, and changes to biogeochemical cycles, transport of organic and inorganic materials, and freshwater community structure and function. The impacts also include reductions in water quality, fish yields, and availability of water for navigation, power generation, and human use. This degradation of Amazonian freshwater ecosystems cannot be curbed presently because existing policies are inconsistent across the Basin, ignore cumulative effects, and do not consider the hydrological connectivity of freshwater ecosystems. Maintaining the integrity of these freshwater ecosystems requires a basin-wide research and policy framework to understand and manage hydrological connectivity across multiple spatial scales and jurisdictional boundaries.
Better Redd than Dead: Optimizing Reservoir Operations for Wild Fish Survival During Drought
NASA Astrophysics Data System (ADS)
Adams, L. E.; Lund, J. R.; Quiñones, R.
2014-12-01
Extreme droughts are difficult to predict and may incur large economic and ecological costs. Dam operations in drought usually consider minimizing economic costs. However, dam operations also offer an opportunity to increase wild fish survival under difficult conditions. Here, we develop a probabilistic optimization approach to developing reservoir release schedules to maximize fish survival in regulated rivers. A case study applies the approach to wild Fall-run Chinook Salmon below Folsom Dam on California's American River. Our results indicate that releasing more water early in the drought will, on average, save more wild fish over the long term.
Othman, Faridah; Taghieh, Mahmood
2016-01-01
Optimal operation of water resources in multiple and multipurpose reservoirs is very complicated. This is because of the number of dams, each dam’s location (Series and parallel), conflict in objectives and the stochastic nature of the inflow of water in the system. In this paper, performance optimization of the system of Karun and Dez reservoir dams have been studied and investigated with the purposes of hydroelectric energy generation and providing water demand in 6 dams. On the Karun River, 5 dams have been built in the series arrangements, and the Dez dam has been built parallel to those 5 dams. One of the main achievements in this research is the implementation of the structure of production of hydroelectric energy as a function of matrix in MATLAB software. The results show that the role of objective function structure for generating hydroelectric energy in weighting method algorithm is more important than water supply. Nonetheless by implementing ε- constraint method algorithm, we can both increase hydroelectric power generation and supply around 85% of agricultural and industrial demands. PMID:27248152
Allison G. Danner; Mohammad Safeeq; Gordon E. Grant; Charlotte Wickham; Desirée Tullos; Mary V. Santelmann
2017-01-01
Scenario-based and scenario-neutral impacts assessment approaches provide complementary information about how climate change-driven effects on streamflow may change the operational performance of multipurpose dams. Examining a case study of Cougar Dam in Oregon, United States, we simulated current reservoir operations under scenarios of plausible future hydrology....
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-16
... operation rules of Folsom Dam and Reservoir to reduce flood risk to the Sacramento area by utilizing the... the Dam's new flood operations plan, with the intention of meeting flood risk management objectives... direction to reduce Folsom Reservoir variable space allocation from the current operating range of 400,000...
Remo, Jonathan W.F.; Ickes, Brian; Ryherd, Julia K.; Guida, Ross J.; Therrell, Matthew D.
2018-01-01
The impacts of dams and levees on the long-term (>130 years) discharge record was assessed along a ~1200 km segment of the Mississippi River between St. Louis, Missouri, and Vicksburg, Mississippi. To aid in our evaluation of dam impacts, we used data from the U.S. National Inventory of Dams to calculate the rate of reservoir expansion at five long-term hydrologic monitoring stations along the study segment. We divided the hydrologic record at each station into three periods: (1) a pre-rapid reservoir expansion period; (2) a rapid reservoir expansion period; and (3) a post-rapid reservoir expansion period. We then used three approaches to assess changes in the hydrologic record at each station. Indicators of hydrologic alteration (IHA) and flow duration hydrographs were used to quantify changes in flow conditions between the pre- and post-rapid reservoir expansion periods. Auto-regressive interrupted time series analysis (ARITS) was used to assess trends in maximum annual discharge, mean annual discharge, minimum annual discharge, and standard deviation of daily discharges within a given water year. A one-dimensional HEC-RAS hydraulic model was used to assess the impact of levees on flood flows. Our results revealed that minimum annual discharges and low-flow IHA parameters showed the most significant changes. Additionally, increasing trends in minimum annual discharge during the rapid reservoir expansion period were found at three out of the five hydrologic monitoring stations. These IHA and ARITS results support previous findings consistent with the observation that reservoirs generally have the greatest impacts on low-flow conditions. River segment scale hydraulic modeling revealed levees can modestly increase peak flood discharges, while basin-scale hydrologic modeling assessments by the U.S. Army Corps of Engineers showed that tributary reservoirs reduced peak discharges by a similar magnitude (2 to 30%). This finding suggests that the effects of dams and levees on peak flood discharges are in part offsetting one another along the modeled river segments and likely other substantially leveed segments of the Mississippi River.
NASA Astrophysics Data System (ADS)
Remo, Jonathan W. F.; Ickes, Brian S.; Ryherd, Julia K.; Guida, Ross J.; Therrell, Matthew D.
2018-07-01
The impacts of dams and levees on the long-term (>130 years) discharge record was assessed along a 1200 km segment of the Mississippi River between St. Louis, Missouri, and Vicksburg, Mississippi. To aid in our evaluation of dam impacts, we used data from the U.S. National Inventory of Dams to calculate the rate of reservoir expansion at five long-term hydrologic monitoring stations along the study segment. We divided the hydrologic record at each station into three periods: (1) a pre-rapid reservoir expansion period; (2) a rapid reservoir expansion period; and (3) a post-rapid reservoir expansion period. We then used three approaches to assess changes in the hydrologic record at each station. Indicators of hydrologic alteration (IHA) and flow duration hydrographs were used to quantify changes in flow conditions between the pre- and post-rapid reservoir expansion periods. Auto-regressive interrupted time series analysis (ARITS) was used to assess trends in maximum annual discharge, mean annual discharge, minimum annual discharge, and standard deviation of daily discharges within a given water year. A one-dimensional HEC-RAS hydraulic model was used to assess the impact of levees on flood flows. Our results revealed that minimum annual discharges and low-flow IHA parameters showed the most significant changes. Additionally, increasing trends in minimum annual discharge during the rapid reservoir expansion period were found at three out of the five hydrologic monitoring stations. These IHA and ARITS results support previous findings consistent with the observation that reservoirs generally have the greatest impacts on low-flow conditions. River segment scale hydraulic modeling revealed levees can modestly increase peak flood discharges, while basin-scale hydrologic modeling assessments by the U.S. Army Corps of Engineers showed that tributary reservoirs reduced peak discharges by a similar magnitude (2 to 30%). This finding suggests that the effects of dams and levees on peak flood discharges are in part offsetting one another along the modeled river segments and likely other substantially leveed segments of the Mississippi River.
1980-11-01
STATEMENT (of the abstract antarod in Block 20, It different frm Report) III. SUPPLEMENTARY NOTES Copies are obtainable from National Technical...should employ a professional engineer experienced in operation and maintanance of darns to develop written operating procedures and a periodic...100 YEAR FLOOD WOULD CAUSE A DAM TO bE OVERTOPPED THEREFORE THE OWNER SHOULD ENGAGE A QUALIFIED PkOFEbSIONAL CONSULTANT USING MORE PERCISE METHODS
1979-07-01
Engineering Division p 0 CAR WE H FRZIAN, NENBER Design Branch Engineering Division J SEPE FIN~EGAN, JR.,CIV ater Control Branch * Engineering Division...Operator g. Purpose of Dam h. Design and Construction History i. Normal Operational Procedures 1.3 PERTINENT DATA ........................... 4 a...Tunnel i. Spillways j. Regulating Outlets SECTION 2: ENGINEERING DATA 2.1 DESIGN .............................. 9 a. Available Data b. Design Features c
1979-05-01
White Rock Dam Recreation Area 25 Reservation Highway Recreation Area 27 Brown’s Valley Dike Recreation Area 28 Potential Recreation Areas 28 Section...Development 35 White Rock Dam 35 Reservation Highway 39 Brown’s Valley Dike 39 Land Use Allocation 42 Project Operations ൲ Operations: Recreation--Intensive...Facilities 4 Proposed Facilities v i i u < *1 I_ • In I . .. PROJECT DAT ~PROJECT DATA LAKE TRAVERSE AND RESERVATION DAM Reservoir Flowage rights to
Filling of Spirit Lake, Washington, May 18, 1980 to July 31, 1982
Meyer, William; Carpenter, Philip J.
1983-01-01
The rockslide/debris avalanche from the north face of Mount St. Helens that precipitated the volcano 's eruption on May 18, 1980 , blocked outflow from Spirit Lake, Washington. There has been no surface outflow since that time. From May 21, 1980, when the first measurement of lake level was made, to August 1, 1982, Spirit Lake has increased its volume from 122,800 acre-ft to 264 ,000 acre-ft, an increase of 115%. Lake level has risen approximately 54 ft during this period. Hydrologic and geologic properties of the debris dam are unknown, but the materials obviously are easily erodible. Steep walled channels up to 60 ft deep have been eroded into the dam and are extending headward toward the lowest points on the crest. In addition, it appears that the lower areas on the crest of the dam are underlain by ash cloud deposits of low density. Indications are that the debris dam could fail by headward erosion, by overtopping with rapid downcutting, or by ' piping ' and rapid erosion. Each type of failure can produce rapid release of stored lake water with very high discharge rates. On the basis of observed filling rates of the lake over the last two yr and precipitation records at four long-term, low altitude National Weather Service stations, it is expected that normal precipitation will fill the lake to the dam crest in December 1985. This estimate is also based on the assumption that loss of water from the lake by seepage continues at the present rate until December 1985. With normal precipitation during the coming yr (August 1982 through July 1983 the lake will fill to a level 50 ft below the lowest existing point on the crest of the debris dam, which is at 3,532 ft altitude. If precipitation exceeds normal by 1.5 times during this coming year, the lake level will be 40 ft below the 3 ,532-ft crest of the debris dam by the end of July 1983. This same lake level can be reached by the end of March 1983 if precipitation from October through March is twice the winter mean. (Author 's abstract)
Dynamic hydrologic economic modeling of tradeoffs in hydroelectric systems
NASA Astrophysics Data System (ADS)
Kern, Jordan D.
Hydropower producers face a future beset by unprecedented changes in the electric power industry, including the rapid growth of installed wind power capacity and a vastly increased supply of natural gas due to horizontal hydraulic fracturing (or "fracking"). There is also increased concern surrounding the potential for climate change to impact the magnitude and frequency of droughts. These developments may significantly alter the financial landscape for hydropower producers and have important ramifications for the environmental impacts of dams. Incorporating wind energy into electric power systems has the potential to affect price dynamics in electricity markets and, in so doing, alter the short-term financial signals on which dam operators rely to schedule reservoir releases. Chapter 1 of this doctoral dissertation develops an integrated reservoir-power system model for assessing the impact of large scale wind power integration of hydropower resources. Chapter 2 explores how efforts to reduce the carbon footprint of electric power systems by using wind energy to displace fossil fuel-based generation may inadvertently yield further impacts to river ecosystems by disrupting downstream flow patterns. Increased concern about the potential for climate change to alter the frequency and magnitude of droughts has led to growing interest in "index insurance" that compensates hydropower producers when values of an environmental variable (or index), such as reservoir inflows, crosses an agreed upon threshold (e.g., low flow conditions). Chapter 3 demonstrates the need for such index insurance contracts to also account for changes in natural gas prices in order to be cost-effective. Chapter 4 of this dissertation analyzes how recent low natural gas prices (partly attributable to fracking) have reduced the cost of implementing ramp rate restrictions at dams, which help restore sub-daily variability in river flows by limiting the flexibility of dam operators in scheduling reservoir releases concurrent with peak electricity demand.
1980-03-01
iron pipe through the dam approximately 42 feet right of the spillway. The flow through the pipe is controlled by a manually operated gate valve located...NATIONAL DAM SAFETY PROGRAM. LAKE SONOMA DAM (NJ 0193). PASSAIC-ETC(U) MAR 80 J P TALERICO DACW MI-T9-C-0011 UNCLASSIFIED NLmhhIEIIIEEEEEI...IIIIIIIIIIEEEE EIIIEEEEEIIEI IIIIEEEEEEEEEE PASS~AIC RIVER BASIN BRANCH OF BURNT MEADOW BROOK PASSAIC COUNTY, NEW JERSEY LA0 O0IM DAM NJi 00193 PHASE 1 INPCTO
Wilcox, Andrew C.; O'Connor, James E.; Major, Jon J.
2014-01-01
Condit Dam on the White Salmon River, Washington, a 38 m high dam impounding a large volume (1.8 million m3) of fine-grained sediment (60% sand, 35% silt and clay, and 5% gravel), was rapidly breached in October 2011. This unique dam decommissioning produced dramatic upstream and downstream geomorphic responses in the hours and weeks following breaching. Blasting a 5 m wide hole into the base of the dam resulted in rapid reservoir drawdown, abruptly releasing ~1.6 million m3 of reservoir water, exposing reservoir sediment to erosion, and triggering mass failures of the thickly accumulated reservoir sediment. Within 90 min of breaching, the reservoir's water and ~10% of its sediment had evacuated. At a gauging station 2.3 km downstream, flow increased briefly by 400 m3 s−1during passage of the initial pulse of released reservoir water, followed by a highly concentrated flow phase—up to 32% sediment by volume—as landslide-generated slurries from the reservoir moved downstream. This hyperconcentrated flow, analogous to those following volcanic eruptions or large landslides, draped the downstream river with predominantly fine sand. During the ensuing weeks, suspended-sediment concentration declined and sand and gravel bed load derived from continued reservoir erosion aggraded the channel by >1 m at the gauging station, after which the river incised back to near its initial elevation at this site. Within 15 weeks after breaching, over 1 million m3 of suspended load is estimated to have passed the gauging station, consistent with estimates that >60% of the reservoir's sediment had eroded. This dam removal highlights the influence of interactions among reservoir erosion processes, sediment composition, and style of decommissioning on rate of reservoir erosion and consequent downstream behavior of released sediment.
Streamflow and Endangered Species Habitat in the Lower Isleta Reach of the Middle Rio Grande
Bovee, Ken D.; Waddle, Terry J.; Spears, J. Mark
2008-01-01
San Acacia Dam is located in a reach of the Rio Grande that has been designated as critical habitat for two endangered species, the Rio Grande silvery minnow (Hybognathus amarus) and the southwestern willow flycatcher (Empidonax traillii extimus). Under present operations, the Rio Grande upstream from the dam is used to convey irrigation water to the Socorro main canal at San Acacia Dam. In order to increase operational flexibility and improve irrigation delivery efficiency, the 'Bernardo Siphon' has been proposed to intercept up to 150 cubic feet per second from the Lower San Juan Riverside Drain on the east side of the Rio Grande and transport it under the river into a drainage canal on the west side. Irrigation deliveries to the Socorro main canal would be conveyed by way of the drainage canal rather than the Rio Grande. The objective of this study was to provide the Bureau of Reclamation (BOR) and other stakeholders with a tool to evaluate the effects of different operational modes of the Bernardo siphon on habitat for H. amarus and E. t. extimus in this section of river. We used a two-dimensional hydraulic simulation model to simulate hydraulic conditions for a range of discharges at three study sites in the Rio Grande between the proposed siphon location and San Acacia Dam. Suitable habitat characteristics were defined for H. amarus by consensus of a panel of experts and for E. t. extimus on the basis of a study conducted in 2003 by BOR. Habitat suitability maps for each targeted life stage and simulated discharge were constructed using a Geographic Information System (ArcGIS) and the results compiled into tables relating discharge to areas of suitable habitat. A separate analysis was conducted to calculate an index of connectivity among habitat patches at low flows. A hydrologic model was constructed to synthesize flows, by reach, without the siphon, which was used as a baseline for comparison with similarly-synthesized discharges with the siphon under different operating rules. Results from the hydrologic time series were combined with the discharge-habitat relations to develop habitat time series models, statistics, and scoring metrics for comparisons of alternative rules of operation for the Bernardo siphon. Suitable habitat for H. amarus was defined as areas having suitable hydraulic conditions alone and as areas having suitable hydraulics in association with large woody debris. Suitable hydraulic habitat for adults was maximized at discharges between 40 and 80 cubic feet per second, and declined rapidly at discharges larger than 150 cubic feet per second. When large woody debris was included in the definition of suitable habitat, discharges between 40 and 200 cubic feet per second provided maximum suitable habitat for adults. Juvenile hydraulic habitat was maximized at discharges between 20 and 80 cubic feet per second, and hydraulic habitat associated with large woody debris was largest at flows between 40 and 150 cubic feet per second. Nesting habitat area for E. t. extimus increased monotonically at discharges larger than 5 ft3/s, but decreased rapidly below that flow.
19. WESTERLY VIEW ALONG SPILLWAY BUCKET, SHOWING CONSTRUCTION OPERATIONS IN ...
19. WESTERLY VIEW ALONG SPILLWAY BUCKET, SHOWING CONSTRUCTION OPERATIONS IN PROGRESS. THE DAM EMBANKMENT IS SHOWN IN THE LEFT DISTANCE.... Volume XX, No. 6, September 5, 1940. - Prado Dam, Spillway, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA
A multi-year analysis of passage and survival at McNary Dam, 2004-09
Adams, Noah S.; Walker, C.E.; Perry, R.W.
2011-01-01
We analyzed 6 years (2004–09) of passage and survival data collected at McNary Dam to determine how dam operations and environmental conditions affect passage and survival of juvenile salmonids. A multinomial logistic regression was used to examine how environmental variables and dam operations relate to passage behavior of juvenile salmonids at McNary Dam. We used the Cormack-Jolly-Seber release-recapture model to determine how the survival of juvenile salmonids passing through McNary Dam relates to environmental variables and dam operations. Total project discharge and the proportion of flow passing the spillway typically had a positive effect on survival for all species and routes. As the proportion of water through the spillway increased, the number of fish passing the spillway increased, as did overall survival. Additionally, survival generally was higher at night. There was no meaningful difference in survival for fish that passed through the north or south portions of the spillway or powerhouse. Similarly, there was no difference in survival for fish released in the north, middle, or south portions of the tailrace. For subyearling Chinook salmon migrating during the summer season, increased temperatures had a drastic effect on passage and survival. As temperature increased, survival of subyearling Chinook salmon decreased through all passage routes and the number of fish that passed through the turbines increased. During years when the temporary spillway weirs (TSWs) were installed, passage through the spillway increased for spring migrants. However, due to the changes made in the location of the TSW between years and the potential effect of other confounding environmental conditions, it is not certain if the increase in spillway passage was due solely to the presence of the TSWs. The TSWs appeared to improve forebay survival during years when they were operated.
33 CFR 117.705 - Beaver Dam Creek.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Beaver Dam Creek. 117.705 Section 117.705 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements New Jersey § 117.705 Beaver Dam Creek. The draw of the...
33 CFR 117.705 - Beaver Dam Creek.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Beaver Dam Creek. 117.705 Section 117.705 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements New Jersey § 117.705 Beaver Dam Creek. The draw of the...
NASA Astrophysics Data System (ADS)
Stegen, J.; Scheibe, T. D.; Chen, X.; Huang, M.; Arntzen, E.; Garayburu-Caruso, V. A.; Graham, E.; Johnson, T. C.; Strickland, C. E.
2017-12-01
The installation and operation of dams have myriad influences on ecosystems, from direct effects on hydrographs to indirect effects on marine biogeochemistry and terrestrial food webs. With > 50000 existing and > 3700 planned large dams world-wide there is a pressing need for holistic understanding of dam impacts. Such understanding is likely to reveal unrecognized opportunities to modify dam operations towards beneficial outcomes. One of the most dramatic influences of daily dam operations is the creation of `artificial intertidal zones' that emerge from short-term increases and decreases in discharge due to hydroelectric power demands; known as hydropeaking. There is a long history of studying the influences of hydropeaking on macrofauna such as fish and invertebrates, but only recently has significant attention been paid to the hydrobiogeochemical effects of hydropeaking. Our aim here is to develop an integrated conceptual model of the hydrobiogeochemical influences of hydropeaking. To do so we reviewed available literature focusing on hydrologic and/or biogeochemical influences of hydropeaking. Results from these studies were collated into a single conceptual model that integrates key physical (e.g., sediment transport, hydromorphology) and biological (e.g., timescale of microbiome response) processes. This conceptual model highlights non-intuitive impacts of hydropeaking, the presence of critical thresholds, and strong interactions among processes. When examined individually these features suggest context dependency, but when viewed through an integrated conceptual model, common themes emerge. We will further discuss a critical next step, which is the local to regional to global evaluation of this conceptual model, to enable multiscale understanding. We specifically propose a global `hydropeaking network' of researchers using common methods, data standards, and analysis techniques to quantify the hydrobiogeochemical effects of hydropeaking across biomes. We will conclude with a prospective discussion of key science questions that emerge from the conceptual model and that can only be answered through a global, synchronized effort. Such an effort has the potential to strongly influence dam operations towards improved health of river corridor ecosystems from local to global scales.
43 CFR 418.29 - Project management.
Code of Federal Regulations, 2011 CFR
2011-10-01
... determination by the Bureau, the Bureau may take over from the District the care, operation, maintenance, and management of the diversion and outlet works (Derby Dam and Lahontan Dam/Reservoir) or any or all of the.... Following written notification from the Bureau, the care, operation, and maintenance of the works may be...
Kern, Jordan D; Patino-Echeverri, Dalia; Characklis, Gregory W
2014-08-19
Due to their operational flexibility, hydroelectric dams are ideal candidates to compensate for the intermittency and unpredictability of wind energy production. However, more coordinated use of wind and hydropower resources may exacerbate the impacts dams have on downstream environmental flows, that is, the timing and magnitude of water flows needed to sustain river ecosystems. In this paper, we examine the effects of increased (i.e., 5%, 15%, and 25%) wind market penetration on prices for electricity and reserves, and assess the potential for altered price dynamics to disrupt reservoir release schedules at a hydroelectric dam and cause more variable and unpredictable hourly flow patterns (measured in terms of the Richards-Baker Flashiness (RBF) index). Results show that the greatest potential for wind energy to impact downstream flows occurs at high (∼25%) wind market penetration, when the dam sells more reserves in order to exploit spikes in real-time electricity prices caused by negative wind forecast errors. Nonetheless, compared to the initial impacts of dam construction (and the dam's subsequent operation as a peaking resource under baseline conditions) the marginal effects of any increased wind market penetration on downstream flows are found to be relatively minor.
1980-04-01
generally fair condition because of the seepage through the left spillway training wall and because the low level outlet has not been operated in many...that a dam of this class which does not have sufficient spillway capacity to discharge fifty percent of the PKF , should be adjudged as having a...2,070 cfs or about 14 percent of the test flood outflow without overtopping the dam. The dam is judged to be in generally fair condition because of the
1979-03-01
approximately 824 acre-feet of water with the reservoir level at the top of the dam, which is approximately 23 feet above the bed of Pattaconk Brook. According...Pattaconk Brook, from 2 to 4 feet above the water level. Should the dam breach, there is potential for loss of life at this downstream development. e...under the jurisdiction of the Water Resources Commission as af State Park in 1959. f. Operator - None. g. Purpose of the Dam - Recreational; Part of
NASA Astrophysics Data System (ADS)
Rounds, S. A.; Buccola, N. L.
2014-12-01
The two-dimensional (longitudinal, vertical) water-quality model CE-QUAL-W2, version 3.7, was enhanced with new features to help dam operators and managers efficiently explore and optimize potential solutions for temperature management downstream of thermally stratified reservoirs. Such temperature management often is accomplished by blending releases from multiple dam outlets that access water of different temperatures at different depths in the reservoir. The original blending algorithm in this version of the model was limited to mixing releases from two outlets at a time, and few constraints could be imposed. The new enhanced blending algorithm allows the user to (1) specify a time-series of target release temperatures, (2) designate from 2 to 10 floating or fixed-elevation outlets for blending, (3) impose maximum head constraints as well as minimum and maximum flow constraints for any blended outlet, and (4) set a priority designation for each outlet that allows the model to choose which outlets to use and how to balance releases among them. The modified model was tested against a previously calibrated model of Detroit Lake on the North Santiam River in northwestern Oregon, and the results compared well. The enhanced model code is being used to evaluate operational and structural scenarios at multiple dam/reservoir systems in the Willamette River basin in Oregon, where downstream temperature management for endangered fish is a high priority for resource managers and dam operators. These updates to the CE-QUAL-W2 blending algorithm allow scenarios involving complicated dam operations and/or hypothetical outlet structures to be evaluated more efficiently with the model, with decreased need for multiple/iterative model runs or preprocessing of model inputs to fully characterize the operational constraints.
Reservoir operations under climate change: Storage capacity options to mitigate risk
NASA Astrophysics Data System (ADS)
Ehsani, Nima; Vörösmarty, Charles J.; Fekete, Balázs M.; Stakhiv, Eugene Z.
2017-12-01
Observed changes in precipitation patterns, rising surface temperature, increases in frequency and intensity of floods and droughts, widespread melting of ice, and reduced snow cover are some of the documented hydrologic changes associated with global climate change. Climate change is therefore expected to affect the water supply-demand balance in the Northeast United States and challenge existing water management strategies. The hydrological implications of future climate will affect the design capacity and operating characteristics of dams. The vulnerability of water resources systems to floods and droughts will increase, and the trade-offs between reservoir releases to maintain flood control storage, drought resilience, ecological flow, human water demand, and energy production should be reconsidered. We used a Neural Networks based General Reservoir Operation Scheme to estimate the implications of climate change for dams on a regional scale. This dynamic daily reservoir module automatically adapts to changes in climate and re-adjusts the operation of dams based on water storage level, timing, and magnitude of incoming flows. Our findings suggest that the importance of dams in providing water security in the region will increase. We create an indicator of the Effective Degree of Regulation (EDR) by dams on water resources and show that it is expected to increase, particularly during drier months of year, simply as a consequence of projected climate change. The results also indicate that increasing the size and number of dams, in addition to modifying their operations, may become necessary to offset the vulnerabilities of water resources systems to future climate uncertainties. This is the case even without considering the likely increase in future water demand, especially in the most densely populated regions of the Northeast.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harnish, Ryan A.; Colotelo, Alison HA; Li, Xinya
2014-12-01
In 2012 and 2013, Pacific Northwest National Laboratory conducted a study that summarized the passage proportions and route-specific survival rates of steelhead kelts that passed through Federal Columbia River Power System (FCRPS) dams. To accomplish this, a total of 811 steelhead kelts were tagged with Juvenile Salmon Acoustic Telemetry System (JSATS) transmitters. Acoustic receivers, both autonomous and cabled, were deployed throughout the FCRPS to monitor the downstream movements of tagged-kelts. Kelts were also tagged with Passive Integrated Transponder tags to monitor passage through juvenile bypass systems and detect returning fish. The current study evaluated data collected in 2012 and 2013more » to identify individual, behavioral, environmental and dam operation variables that were related to passage and survival of steelhead kelts that passed through FCRPS dams. Bayesian model averaging of multivariable logistic regression models was used to identify the environmental, temporal, operational, individual, and behavioral variables that had the highest probability of influencing the route of passage and the route-specific survival probabilities for kelts that passed Lower Granite (LGR), Little Goose (LGS), and Lower Monumental (LMN) dams in 2012 and 2013. The posterior probabilities of the best models for predicting route of passage ranged from 0.106 for traditional spill at LMN to 0.720 for turbine passage at LGS. Generally, the behavior (depth and near-dam searching activity) of kelts in the forebay appeared to have the greatest influence on their route of passage. Shallower-migrating kelts had a higher probability of passing via the weir and deeper-migrating kelts had a higher probability of passing via the JBS and turbines than other routes. Kelts that displayed a higher level of near-dam searching activity had a higher probability of passing via the spillway weir and those that did less near-dam searching had a higher probability of passing via the JBS and turbines. The side of the river in which kelts approached the dam and dam operations also affected route of passage. Dam operations and the size and condition of kelts were found to have the greatest effect on route-specific survival probabilities for fish that passed via the spillway at LGS. That is, longer kelts and those in fair condition had a lower probability of survival for fish that passed via the spillway weir. The survival of spillway weir- and deep-spill passed kelts was positively correlated with the percent of the total discharge that passed through turbine unit 4. Too few kelts passed through the traditional spill, JBS, and turbine units to evaluate survival through these routes. The information gathered in this study describes Snake River steelhead kelt passage behavior, rates, and distributions through the FCRPS as well as provide information to biologists and engineers about the dam operations and abiotic conditions that are related to passage and survival of steelhead kelts.« less
NASA Astrophysics Data System (ADS)
Fuller, Brian M.; Sklar, Leonard S.; Compson, Zacchaeus G.; Adams, Kenneth J.; Marks, Jane C.; Wilcox, Andrew C.
2011-03-01
The linkages between fluvial geomorphology and aquatic ecosystems are commonly conceptualized as a one-way causal chain in which geomorphic processes create the physical template for ecological dynamics. In streams with a travertine step-pool morphology, however, biotic processes strongly influence the formation and growth of travertine dams, creating the potential for numerous feedbacks. Here we take advantage of the decommissioning of a hydroelectric project on Fossil Creek, Arizona, where restoration of CaCO 3-rich baseflow has triggered rapid regrowth of travertine dams, to explore the interactions between biotic and abiotic factors in travertine morphodynamics. We consider three conceptual frameworks, where biotic factors independently modulate the rate of physical and chemical processes that produce travertine dams; combine with abiotic factors in a set of feedback loops; and work in opposition to abiotic processes, such that the travertine step-pool morphology reflects a dynamic balance between dominantly-biotic constructive processes and dominantly-abiotic destructive processes. We consider separately three phases of an idealized life cycle of travertine dams: dam formation, growth, and destruction by erosive floods. Dam formation is catalyzed by abiotic factors (e.g. channel constrictions, and bedrock steps) and biotic factors (e.g. woody debris, and emergent vegetation). From measurements of changes over time in travertine thickness on a bedrock step, we find evidence for a positive feedback between flow hydraulics and travertine accrual. Measurements of organic content in travertine samples from this step show that algal growth contributes substantially to travertine accumulation and suggest that growth is most rapid during seasonal algal blooms. To document vertical growth of travertine dams, we embedded 252 magnets into nascent travertine dams, along a 10 km stretch of river. Growth rates are calculated from changes over time in the magnetic field intensity at the dam surface. At each magnet we record a range of hydraulic and travertine composition variables to characterize the dominant mechanism of growth: abiotic precipitation, algal growth, trapping of organic material, or in situ plant growth. We find: (1) rapid growth of travertine dams following flow restoration, averaging more than 2 cm/year; (2) growth rates decline downstream, consistent with loss of dissolved constituents because of upstream travertine deposition, but also parallel to a decline in organic content in dam surface material and a downstream shift in dominant biotic mechanism; (3) biotic mechanisms are associated with faster growth rates; and (4) correlations between hydraulic attributes and growth rates are more consistent with biotic than abiotic controls. We conclude that the strong influence of living organisms on rates of travertine growth, coupled with the beneficial effects of travertine on ecosystem dynamics, demonstrate a positive feedback between biology and geomorphology. During our two-year study period, erosive flood flows occurred causing widespread removal of travertine. The temporal distribution of travertine growth and erosion over the study period is consistent with a bimodal magnitude-frequency relation in which growth dominates except when large, infrequent storms occur. This model may be useful in other systems where biology exerts strong controls on geomorphic processes.
Fragmentation of Andes-to-Amazon connectivity by hydropower dams
Anderson, Elizabeth P.; Jenkins, Clinton N.; Heilpern, Sebastian; Maldonado-Ocampo, Javier A.; Carvajal-Vallejos, Fernando M.; Encalada, Andrea C.; Rivadeneira, Juan Francisco; Hidalgo, Max; Cañas, Carlos M.; Ortega, Hernan; Salcedo, Norma; Maldonado, Mabel; Tedesco, Pablo A.
2018-01-01
Andes-to-Amazon river connectivity controls numerous natural and human systems in the greater Amazon. However, it is being rapidly altered by a wave of new hydropower development, the impacts of which have been previously underestimated. We document 142 dams existing or under construction and 160 proposed dams for rivers draining the Andean headwaters of the Amazon. Existing dams have fragmented the tributary networks of six of eight major Andean Amazon river basins. Proposed dams could result in significant losses in river connectivity in river mainstems of five of eight major systems—the Napo, Marañón, Ucayali, Beni, and Mamoré. With a newly reported 671 freshwater fish species inhabiting the Andean headwaters of the Amazon (>500 m), dams threaten previously unrecognized biodiversity, particularly among endemic and migratory species. Because Andean rivers contribute most of the sediment in the mainstem Amazon, losses in river connectivity translate to drastic alteration of river channel and floodplain geomorphology and associated ecosystem services. PMID:29399629
Fragmentation of Andes-to-Amazon connectivity by hydropower dams.
Anderson, Elizabeth P; Jenkins, Clinton N; Heilpern, Sebastian; Maldonado-Ocampo, Javier A; Carvajal-Vallejos, Fernando M; Encalada, Andrea C; Rivadeneira, Juan Francisco; Hidalgo, Max; Cañas, Carlos M; Ortega, Hernan; Salcedo, Norma; Maldonado, Mabel; Tedesco, Pablo A
2018-01-01
Andes-to-Amazon river connectivity controls numerous natural and human systems in the greater Amazon. However, it is being rapidly altered by a wave of new hydropower development, the impacts of which have been previously underestimated. We document 142 dams existing or under construction and 160 proposed dams for rivers draining the Andean headwaters of the Amazon. Existing dams have fragmented the tributary networks of six of eight major Andean Amazon river basins. Proposed dams could result in significant losses in river connectivity in river mainstems of five of eight major systems-the Napo, Marañón, Ucayali, Beni, and Mamoré. With a newly reported 671 freshwater fish species inhabiting the Andean headwaters of the Amazon (>500 m), dams threaten previously unrecognized biodiversity, particularly among endemic and migratory species. Because Andean rivers contribute most of the sediment in the mainstem Amazon, losses in river connectivity translate to drastic alteration of river channel and floodplain geomorphology and associated ecosystem services.
Mades, Dean M.; Weiss, Linda S.; Gray, John R.
1991-01-01
Techniques for computing discharge are developed for Brandon Road Dam on the Des Plaines River and for Dresden Island, Marseilles, and Starved Rock Dams on the Illinois River. At Brandon Road Dam, streamflow is regulated by the operation of Tainter gates and headgates. At Dresden Island, Marseilles, and Starved Rock Dams, only Tainter gates are operated to regulate streamflow. The locks at all dams are equipped with culvert valves that are used to fill and empty the lock. The techniques facilitate determination of discharge at locations along the upper Illinois Waterway where no streamflow-gaging stations exist. The techniques are also useful for computing low flows when the water-surface slope between control structures on the river approaches zero and traditional methods of determining discharge based on slope are unsatisfactory. Two techniques can be used to compute discharge at the dams--gate ratings and tailwater ratings . A gate ratingdescribes the relation between discharge, gate opening, tailwater stage, and headwater stage. A tailwater rating describes the relation between tailwater stage and discharge. Gate ratings for Tainter gates at Dresden Island, Marseilles, and Starved Rock Dams are based on a total of 78 measurements of discharge that range from 569 to 86,400 cubic feet per second. Flood hydrographs developed from the gate ratings and Lockmaster records of gate opening and stage compare closely with streamflow records published for nearby streamflow-gaging stations. Additional measurements are needed to verify gate ratings for Tainter gates and headgates at Brandon Road Dam after the dam rehabilitation is completed. Extensive leakage past deteriorated headgates and sluice gates contributed to uncertainty in the ratings developed for this dam. A useful tailwater rating is developed for Marseilles Dam. Tailwater ratings for Dresden Island Dam and Starved Rock Dam are of limited use because of varying downstream channel-storage conditions. A tailwater rating could not be developed for Brandon Road Dam because its tailwater pool is substantially affected by the headwater pool of Dresden Island Dam.
Have Large Dams Altered Extreme Precipitation Patterns?
NASA Astrophysics Data System (ADS)
Hossain, Faisal; Jeyachandran, Indumathi; Pielke, Roger
2009-12-01
Dams and their impounded waters are among the most common civil infrastructures, with a long heritage of modern design and operations experience. In particular, large dams, defined by the International Commission on Large Dams (ICOLD) as having a height greater than 15 meters from the foundation and holding a reservoir volume of more than 3 million cubic meters, have the potential to vastly transform local climate, landscapes, regional economics, and urbanization patterns. In the United States alone, about 75,000 dams are capable of storing a volume of water equaling almost 1 year's mean runoff of the nation [Graf, 1999]. The World Commission on Dams (WCD) reports that at least 45,000 large dams have been built worldwide since the 1930s. These sheer numbers raise the question of the extent to which large dams and their impounded waters alter patterns that would have been pervasive had the dams not been built.
Introduction of an Emergency Response Plan for flood loading of Sultan Abu Bakar Dam in Malaysia
NASA Astrophysics Data System (ADS)
Said, N. F. Md; Sidek, L. M.; Basri, H.; Muda, R. S.; Razad, A. Z. Abdul
2016-03-01
Sultan Abu Bakar Dam Emergency Response Plan (ERP) is designed to assist employees for identifying, monitoring, responding and mitigation dam safety emergencies. This paper is outlined to identification of an organization chart, responsibility for emergency management team and triggering level in Sultan Abu Bakar Dam ERP. ERP is a plan that guides responsibilities for proper operation of Sultan Abu Bakar Dam in respond to emergency incidents affecting the dam. Based on this study four major responsibilities are needed for Abu Bakar Dam owing to protect any probable risk for downstream which they can be Incident Commander, Deputy Incident Commander, On-Scene Commander, Civil Engineer. In conclusion, having organization charts based on ERP studies can be helpful for decreasing the probable risks in any projects such as Abu Bakar Dam and it is a way to identify and suspected and actual dam safety emergencies.
Evaluating the Mosul Dam's Instability after Resumption of Maintenance
NASA Astrophysics Data System (ADS)
Al-husseinawi, Y.; Li, Z.; Clarke, P. J.; Edwards, S.
2017-12-01
There is serious concern about the safety of Mosul dam in the north of Iraq. Millions of people in the downstream area are exposed to risk of catastrophic collapse of this dam due to its soluble foundation. Recent study (Milillo et al., 2016, Scientific Report/10.1038/srep37408) reported that the dam deformation has accelerated since August 2014, when grouting operations were interrupted due to the conflict in the region. In this study, we investigate the health of Mosul dam since Jun 2016 using three independent datasets: Sentinel-1A/B SAR images, levelling, and GPS measurement. The latter are based on three epochs of terrestrial observation for levelling and GPS data: March 2016, December 2016 and July 2017. During this period, maintenance operations are being recovered to keep the dam stable. The monitoring network, on which the levelling and GPS observations are based, consists of eighty-seven pillars distributed on the dam surface. The results from InSAR and leveling data show that the dam crest is settling by 9 mm/yr. In contrast to previous studies, our results show a deceleration in the settlement. This may be due to the maintenance operations performed in the last few months. InSAR time series analysis was performed using the in-house tool TM-SBAS. When using the small baseline Sentinel-1 constellation, all possibilities of image choice are taken into consideration and the SRTM DEM accuracy is sufficient to generate the differential interferograms. Data from both Sentinel-1A and -1B images are used, and these results can be compared with multi-platform (Envisat, Sentinel-1, Cosmo-SkyMed, and TerraSar-X) data collected during the period between March 2003 and September 2016.
78 FR 53494 - Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-29
... fundamental part of this mission was the construction and operation of an integrated system of dams and... by the Federal Emergency Management Agency, TVA prepares for the worst case flooding event in order... appropriate best management practices during all phases of construction and maintenance associated with the...
43 CFR 418.18 - Diversions at Derby Dam.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Operations and Management § 418.18 Diversions at Derby Dam. (a) Diversions of Truckee River water at Derby Dam must be managed to maintain minimum terminal flow to Lahontan Reservoir or the Carson River except... achieve an average terminal flow of 20 cfs or less during times when diversions to Lahontan Reservoir are...
Bernhardt, C.E.; Stanley, J.-D.; Horton, B.P.
2011-01-01
The pollen record in a sediment core from Manzala lagoon on the Nile delta coastal margin of Egypt, deposited from ca. AD 1860 to 1990, indicates rapid coastal wetland vegetation responses to two primary periods of human activity. These are associated with artificially altered Nile hydrologic regimes in proximal areas and distal sectors located to ???1200 km south of Manzala. Freshwater wetland plants that were dominant, such as Typha and Phragmites, decreased rapidly, whereas in the early 1900s, brackish water wetland species (e.g., Amaranthaceae) increased. This change occurred after closure of the Aswan Low Dam in 1902. The second major modification in the pollen record occurred in the early 1970s, after Aswan High Dam closure from 1965 to 1970, when Typha pollen abundance increased rapidly. Massive population growth occurred along the Nile during the 130 years represented by the core section. During this time, the total volume of lagoon water decreased because of conversion of wetland areas to agricultural land, and input of organic-rich sediment, sewage (municipal, agricultural, industrial), and fertilizer in Manzala lagoon increased markedly. Although the wetland plant community has continued to respond to increasingly intensified and varied human-induced pressures in proximal sectors, the two most marked changes in Manzala pollen best correlate with distal events (i.e., closure of the two dams at Aswan). The study also shows that the two major vegetation changes in Manzala lagoon each occurred less than 10 years after closure upriver of the Low and High dams that markedly altered the Nile regime from Upper Egypt to the coast. ?? 2011, the Coastal Education & Research Foundation (CERF).
GNSS Monitoring of Deformation within heavy civil infrastructure
NASA Astrophysics Data System (ADS)
Montillet, Jean-Philippe; Melbourne, Timothy; Szeliga, Walter; Schrock, Gavin
2015-04-01
The steady increase in precision simultaneous with the decreasing of continuous GPS monitoring has enabled the deployment of receivers for a host of new activities. Here we discuss the precision obtained from several multi-station installations operated over a five-year period on several heavy civil-engineered structures, including two earthen-fill dams and subsiding highway overpass damaged by seismic shaking. In the past 5 years, the Cascadia Hazards Institute (Pacific Northwest Geodetic Array) at Central Washington University together with the Washington department of public utilities (Land Survey) have been monitoring several structures around Seattle area including two dams (Howard Hansen and Tolt). One aim of this study is to test the use of continuous GNSS in order to detect any deformations due to rapid pool level rises or to monitor the safety of a structure when an Earthquake strikes it. In this study, data is processed using Real Time Kinematic GPS with short baseline (d < 500 m) and GPS daily position (PPP). However, multipath is the most limiting factor on accuracy for very precise positioning applications with GPS. It is very often present indoors and outdoors, especially in narrow valleys with a limited view of the sky. As a result, multipath can amount to an error of a few centimetres. Unfortunately, the accuracy requirements of precision deformation monitoring are generally at the sub centimetre level, which is presently a big challenge on an epoch-by-epoch basis with regular, carrier phase techniques. Thus, it needs to be properly mitigated. In this study, several stations are set up on the dams (4 stations on the Tolt reservoir and 10 stations on the Howard Hansen dam), and spatial filtering can then be used to mitigate multipath. In addition, several signal processing techniques are also investigated (i.e. Empirical mode decomposition, sidereal filtering, adaptive filtering). RTK GPS should allow to monitor rapid deformations, whereas GPS daily position is used to detect long-term deformations such as the pool level rises due to the melting of ice cap on surrounding mountains. Note that RTK measurements are processed with the MIT software TRACK and the GPS daily positions estimated with GAMIT-GLOBK.
33 CFR 208.25 - Pensacola Dam and Reservoir, Grand (Neosho) River, Okla.
Code of Federal Regulations, 2011 CFR
2011-07-01
... elevation of the reservoir pool and the tailwater, number of gates in operation, spillway and turbine... instructions for operation of the reservoir in the interest of flood control during an emergency condition when... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Pensacola Dam and Reservoir...
33 CFR 208.26 - Altus Dam and Reservoir, North Fork Red River, Okla.
Code of Federal Regulations, 2010 CFR
2010-07-01
... elevation forecast indicates that this operation will result in a reservoir level exceeding elevation 1562... and reservoir from major damage. (j) Any time that the Bureau of Reclamation determines that operation... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Altus Dam and Reservoir, North...
33 CFR 208.26 - Altus Dam and Reservoir, North Fork Red River, Okla.
Code of Federal Regulations, 2011 CFR
2011-07-01
... elevation forecast indicates that this operation will result in a reservoir level exceeding elevation 1562... and reservoir from major damage. (j) Any time that the Bureau of Reclamation determines that operation... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Altus Dam and Reservoir, North...
33 CFR 208.25 - Pensacola Dam and Reservoir, Grand (Neosho) River, Okla.
Code of Federal Regulations, 2010 CFR
2010-07-01
... elevation of the reservoir pool and the tailwater, number of gates in operation, spillway and turbine... instructions for operation of the reservoir in the interest of flood control during an emergency condition when... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Pensacola Dam and Reservoir...
Singer, M.B.
2007-01-01
This paper reports basinwide patterns of hydrograph alteration via statistical and graphical analysis from a network of long-term streamflow gauges located various distances downstream of major dams and confluences in the Sacramento River basin in California, USA. Streamflow data from 10 gauging stations downstream of major dams were divided into hydrologic series corresponding to the periods before and after dam construction. Pre- and post-dam flows were compared with respect to hydrograph characteristics representing frequency, magnitude and shape: annual flood peak, annual flow trough, annual flood volume, time to flood peak, flood drawdown time and interarrival time. The use of such a suite of characteristics within a statistical and graphical framework allows for generalising distinct strategies of flood control operation that can be identified without any a priori knowledge of operations rules. Dam operation is highly dependent on the ratio of reservoir capacity to annual flood volume (impounded runoff index). Dams with high values of this index generally completely cut off flood peaks thus reducing time to peak, drawdown time and annual flood volume. Those with low values conduct early and late flow releases to extend the hydrograph, increasing time to peak, drawdown time and annual flood volume. The analyses reveal minimal flood control benefits from foothill dams in the lower Sacramento River (i.e. dissipation of the down-valley flood control signal). The lower part of the basin is instead reliant on a weir and bypass system to control lowland flooding. Data from a control gauge (i.e. with no upstream dams) suggest a background signature of global climate change expressed as shortened flood hydrograph falling limbs and lengthened flood interarrival times at low exceedence probabilities. This research has implications for flood control, water resource management, aquatic and riparian ecosystems and for rehabilitation strategies involving flow alteration and/or manipulation of sediment supplies. Copyright ?? 2006 John Wiley & Sons, Ltd.
White, M.A.; Schmidt, J.C.; Topping, D.J.
2005-01-01
Wavelet analysis is a powerful tool with which to analyse the hydrologic effects of dam construction and operation on river systems. Using continuous records of instantaneous discharge from the Lees Ferry gauging station and records of daily mean discharge from upstream tributaries, we conducted wavelet analyses of the hydrologic structure of the Colorado River in Grand Canyon. The wavelet power spectrum (WPS) of daily mean discharge provided a highly compressed and integrative picture of the post-dam elimination of pronounced annual and sub-annual flow features. The WPS of the continuous record showed the influence of diurnal and weekly power generation cycles, shifts in discharge management, and the 1996 experimental flood in the post-dam period. Normalization of the WPS by local wavelet spectra revealed the fine structure of modulation in discharge scale and amplitude and provides an extremely efficient tool with which to assess the relationships among hydrologic cycles and ecological and geomorphic systems. We extended our analysis to sections of the Snake River and showed how wavelet analysis can be used as a data mining technique. The wavelet approach is an especially promising tool with which to assess dam operation in less well-studied regions and to evaluate management attempts to reconstruct desired flow characteristics. Copyright ?? 2005 John Wiley & Sons, Ltd.
Grand Canyon Monitoring and Research Center
Hamill, John F.
2009-01-01
The Grand Canyon of the Colorado River, one of the world's most spectacular gorges, is a premier U.S. National Park and a World Heritage Site. The canyon supports a diverse array of distinctive plants and animals and contains cultural resources significant to the region's Native Americans. About 15 miles upstream of Grand Canyon National Park sits Glen Canyon Dam, completed in 1963, which created Lake Powell. The dam provides hydroelectric power for 200 wholesale customers in six western States, but it has also altered the Colorado River's flow, temperature, and sediment-carrying capacity. Over time this has resulted in beach erosion, invasion and expansion of nonnative species, and losses of native fish. Public concern about the effects of Glen Canyon Dam operations prompted the passage of the Grand Canyon Protection Act of 1992, which directs the Secretary of the Interior to operate the dam 'to protect, mitigate adverse impacts to, and improve values for which Grand Canyon National Park and Glen Canyon National Recreation Area were established...' This legislation also required the creation of a long-term monitoring and research program to provide information that could inform decisions related to dam operations and protection of downstream resources.
A simplified water temperature model for the Colorado River below Glen Canyon Dam
Wright, S.A.; Anderson, C.R.; Voichick, N.
2009-01-01
Glen Canyon Dam, located on the Colorado River in northern Arizona, has affected the physical, biological and cultural resources of the river downstream in Grand Canyon. One of the impacts to the downstream physical environment that has important implications for the aquatic ecosystem is the transformation of the thermal regime from highly variable seasonally to relatively constant year-round, owing to hypolimnetic releases from the upstream reservoir, Lake Powell. Because of the perceived impacts on the downstream aquatic ecosystem and native fish communities, the Glen Canyon Dam Adaptive Management Program has considered modifications to flow releases and release temperatures designed to increase downstream temperatures. Here, we present a new model of monthly average water temperatures below Glen Canyon Dam designed for first-order, relatively simple evaluation of various alternative dam operations. The model is based on a simplified heat-exchange equation, and model parameters are estimated empirically. The model predicts monthly average temperatures at locations up to 421 km downstream from the dam with average absolute errors less than 0.58C for the dataset considered. The modelling approach used here may also prove useful for other systems, particularly below large dams where release temperatures are substantially out of equilibrium with meteorological conditions. We also present some examples of how the model can be used to evaluate scenarios for the operation of Glen Canyon Dam.
1981-09-14
34 rga Highland Park Reservoir Dam Vi’.sual I. .. ’. •Genesee River Basin, ’!ydrolozy. ". ". . . Scabi tyMo r e C u t.,.- Js eps’ •; ::or.ation -3 :..i :n...dam impounds a municipal water storage reservoir. g. Design and Construction History The dam was designed and built around 1875. h. Normal Operating... History : Date Constructed Around 1875 Date(s) Reconstructed N/A Designer Unknown Constructed by Unknown Owner Water Department, City of Rochester, New
1978-12-01
Division to inspect and report on selected dams in the State of Connecticut. Authorization and notice to proceed were issued to Storch Engineers under a...operable however. c. Size Classification - The size classification of I the dam is intermediate. The storage (2,520 acre-feet) governs the...Landscape Architects Planners - Environental Consultants 13ATFRMN ?ARtK P*Nr3 DAm CAPAC MlY CUR~VE ELEV .DP/ R AvJQ ATkrp oi .V0i 30-70 31 F q * .7 CO
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-16
... Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal... the U.S. Army Corps of Engineers' maintenance operations of dispersal barrier IIB. During these...
88. AVALON DAM Photographic copy of construction drawing dated ...
88. AVALON DAM - Photographic copy of construction drawing dated February 9, 1912 (from Record Group 115, Box 17, Denver Branch of the National Archives, Denver) METHOD OF CLOSING UP OLD GATE OPENINGS IN SPILLWAY AND ARRANGEMENT OF TURBINES, OPERATING CYLINDER GATES - Carlsbad Irrigation District, Avalon Dam, On Pecos River, 4 miles North of Carlsbad, Carlsbad, Eddy County, NM
5. LOOKING WEST ALONG THE AXIS OF THE DAM TOWARD ...
5. LOOKING WEST ALONG THE AXIS OF THE DAM TOWARD THE OUTLET STRUCTURE. HAND OPERATED MECHANICAL TAMPERS ARE COMPACTING THE FILL ALONG THE STEEL SHEET PILING CUTOFF WALL IN THE FOREGROUND. Volume XIX, No. 6, April 12, 1940. - Prado Dam, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-02
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14063-000] Amnor Hydro West... feasibility of constructing the Hiram M. Chittenden Lock and Dam Hydroelectric Project (Hiram Dam Project or project) located at the Hiram M. Chittenden Lock and Dam facility owned and operated by the U.S. Army...
33 CFR 208.27 - Fort Cobb Dam and Reservoir, Pond (Cobb) Creek, Oklahoma.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Engineer showing the elevation of the reservoir level; number of river outlet works gates in operation with... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Fort Cobb Dam and Reservoir, Pond..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.27 Fort Cobb Dam and Reservoir...
33 CFR 208.27 - Fort Cobb Dam and Reservoir, Pond (Cobb) Creek, Oklahoma.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Engineer showing the elevation of the reservoir level; number of river outlet works gates in operation with... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Fort Cobb Dam and Reservoir, Pond..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.27 Fort Cobb Dam and Reservoir...
Grams, P.E.; Schmidt, J.C.; Topping, D.J.
2007-01-01
Closure of Glen Canyon Dam in 1963 transformed the Colorado River by reducing the magnitude and duration of spring floods, increasing the magnitude of base flows, and trapping fine sediment delivered from the upper watershed. These changes caused the channel downstream in Glen Canyon to incise, armor, and narrow. This study synthesizes over 45 yr of channel-change measurements and demonstrates that the rate and style of channel adjustment are directly related to both natural processes associated with sediment deficit and human decisions about dam operations. Although bed lowering in lower Glen Canyon began when the first cofferdam was installed in 1959, most incision occurred in 1965 in conjunction with 14 pulsed high flows that scoured an average of 2.6 m of sediment from the center of the channel. The average grain size of bed material has increased from 0.25 mm in 1956 to over 20 mm in 1999. The magnitude of incision at riffles decreases with distance downstream from the dam, while the magnitude of sediment evacuation from pools is spatially variable and extends farther downstream. Analysis of bed-material mobility indicates that the increase in bed-material grain size and reduction in reach-average gradient are consistent with the transformation of an adjustable-bed alluvial river to a channel with a stable bed that is rarely mobilized. Decreased magnitude of peak discharges in the post-dam regime coupled with channel incision and the associated downward shifts of stage-discharge relations have caused sandbar and terrace erosion and the transformation of previously active sandbars and gravel bars to abandoned deposits that are no longer inundated. Erosion has been concentrated in a few pre-dam terraces that eroded rapidly for brief periods and have since stabilized. The abundance of abandoned deposits decreases downstream in conjunction with decreasing magnitude of shift in the stage-discharge relations. In the downstream part of the study area where riffles controlling channel elevation have not incised, channel narrowing has resulted from decreased magnitude of peak discharges and minor post-dam deposition. These physical changes to the aquatic and riparian systems have supported the establishment and success of an artifact ecosystem dominated by non-native species. Models for the channel response downstream from large dams typically consider factors such as the degree of sediment deficit, the pre-dam surface and subsurface grain size, and the magnitude of post-dam average flows. These results suggest that it is also necessary to consider (1) the possibility of variable responses among different channel elements and (2) the potential importance of exceptional flows resulting from management decisions. ?? 2007 Geological Society of America.
Estimated cumulative sediment trapping in future hydropower reservoirs in Africa
NASA Astrophysics Data System (ADS)
Lucía, Ana; Berlekamp, Jürgen; Zarfl, Christiane
2017-04-01
Despite a rapid economic development in Sub-Saharan Africa, almost 70% of the human population in this area remain disconnected from electricity access (International Energy Agency 2011). Mitigating climate change and a search for renewable, "climate neutral" electricity resources are additional reasons why Africa will be one key centre for future hydropower dam building, with only 8% of the technically feasible hydropower potential actually exploited. About 300 major hydropower dams with a total capacity of 140 GW are currently under construction (11.4%) or planned (88.6%) (Zarfl et al. 2015). Despite the benefits of hydropower dams, fragmentation of the rivers changes the natural flow, temperature and sediment regime. This has consequences for a high number of people that directly depend on the primary sector linked to rivers and floodplains. But sediment trapping in the reservoir also affects dam operation and decreases its life span. Thus, the objective of this work is to quantify the dimension of sediment trapping by future hydropower dams in African river basins. Soil erosion is described with the universal soil loss equation (Wischmeier & Smith 1978) and combined with the connectivity index (Cavalli et al. 2013) to estimate the amount of eroded soil that reaches the fluvial network and finally ends up in the existing (Lehner et al. 2011) and future reservoirs (Zarfl et al. 2015) per year. Different scenarios assuming parameter values from the literature are developed to include model uncertainty. Estimations for existing dams will be compared with literature data to evaluate the applied estimation method and scenario assumptions. Based on estimations for the reservoir volume of the future dams we calculated the potential time-laps of the future reservoirs due to soil erosion and depending on their planned location. This approach could support sustainable decision making for the location of future hydropower dams. References Cavalli, M., Trevisani, S., Comiti, F., & Marchi, L. (2013). Geomorphometric assessment of spatial sediment connectivity in small Alpine catchments. Geomorphology, 188, 31-41. Lehner, B., Liermann, C. R., Revenga, C., Vörösmarty, C., Fekete, B., Crouzet, P., Döll, P., Endejan, M., Frenken, K., Magome, J., Nilsson, C., Robertson, J.C., Rödel, R., Sindorf , N., & Wisser, D. (2011). High-resolution mapping of the world's reservoirs and dams for sustainable river-flow management. Frontiers in Ecology and the Environment, 9(9), 494-502. Wischmeier, W. H. and D. D. Smith. (1978). Predicting rainfall erosion losses: guide to conservation planning. USDA, Agriculture Handbook 537. U.S. Government Printing Office, Washington, DC. Zarfl, C., Lumsdon, A. E., Berlekamp, J., Tydecks, L., & Tockner, K. (2015). A global boom in hydropower dam construction. Aquatic Sciences, 77(1), 161-170.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-17
... Long-term Experimental and Management Plan (LTEMP) for the operation of Glen Canyon Dam. This Federal... and Hold Public Scoping Meetings on the Adoption of a Long-term Experimental and Management Plan for the Operation of Glen Canyon Dam AGENCY: Bureau of Reclamation and National Park Service, Interior...
Thermal pollution in rivers: Will adding gravel help to cool them down?
Marie Oliver; Gordon Grant; Barbara Burkholder
2011-01-01
Thermal pollution in rivers can be caused by dams, logging, municipal wastewater treatment, and other human activities. High water termperatures stress ecosystems, kill fish, and promote disease and parasites, and so dam operators, timber companies, and municipalities are held responsible for thermal loading caused by their operations. These entities are looking for...
NASA Astrophysics Data System (ADS)
Yuan, Wenhao; Yin, Daowei; Finlayson, Brian; Chen, Zhongyuan
2012-04-01
The geomorphic impacts of dams on downstream river channels are complex, not readily predictable for specific cases, but widely reported in the literature. For the Three Gorges Dam on the Yangtze (Changjiang) River in China, no studies of the impact of the changed flow and sediment conditions below the dam on the behaviour of the channel were included in the pre-dam feasibility report. We have assembled a database of flow and sediment data for the middle Yangtze River from Yichang to Hankou and used this to analyse changes following the closure of the dam. While total flow is little affected, the operating strategy for the dam that provides for storage of part of the summer high flows to maintain hydroelectric power generation in winter (the low flow season) is reflected in changes to the seasonal distribution of flow below the dam. We calculated potential sediment carrying capacity and compared it with measured sediment concentrations for both pre- and post-dam conditions. While channel sedimentation is indicated along the middle Yangtze for pre-dam conditions, scour is indicated for post-dam conditions, highest at Yichang immediately below the dam and decreasing downstream.
Computational Tools to Assess Turbine Biological Performance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Richmond, Marshall C.; Serkowski, John A.; Rakowski, Cynthia L.
2014-07-24
Public Utility District No. 2 of Grant County (GCPUD) operates the Priest Rapids Dam (PRD), a hydroelectric facility on the Columbia River in Washington State. The dam contains 10 Kaplan-type turbine units that are now more than 50 years old. Plans are underway to refit these aging turbines with new runners. The Columbia River at PRD is a migratory pathway for several species of juvenile and adult salmonids, so passage of fish through the dam is a major consideration when upgrading the turbines. In this paper, a method for turbine biological performance assessment (BioPA) is demonstrated. Using this method, amore » suite of biological performance indicators is computed based on simulated data from a CFD model of a proposed turbine design. Each performance indicator is a measure of the probability of exposure to a certain dose of an injury mechanism. Using known relationships between the dose of an injury mechanism and frequency of injury (dose–response) from laboratory or field studies, the likelihood of fish injury for a turbine design can be computed from the performance indicator. By comparing the values of the indicators from proposed designs, the engineer can identify the more-promising alternatives. We present an application of the BioPA method for baseline risk assessment calculations for the existing Kaplan turbines at PRD that will be used as the minimum biological performance that a proposed new design must achieve.« less
Simulating future water temperatures in the North Santiam River, Oregon
NASA Astrophysics Data System (ADS)
Buccola, Norman L.; Risley, John C.; Rounds, Stewart A.
2016-04-01
A previously calibrated two-dimensional hydrodynamic and water-quality model (CE-QUAL-W2) of Detroit Lake in western Oregon was used in conjunction with inflows derived from Precipitation-Runoff Modeling System (PRMS) hydrologic models to examine in-lake and downstream water temperature effects under future climate conditions. Current and hypothetical operations and structures at Detroit Dam were imposed on boundary conditions derived from downscaled General Circulation Models in base (1990-1999) and future (2059-2068) periods. Compared with the base period, future air temperatures were about 2 °C warmer year-round. Higher air temperature and lower precipitation under the future period resulted in a 23% reduction in mean annual PRMS-simulated discharge and a 1 °C increase in mean annual estimated stream temperatures flowing into the lake compared to the base period. Simulations incorporating current operational rules and minimum release rates at Detroit Dam to support downstream habitat, irrigation, and water supply during key times of year resulted in lower future lake levels. That scenario results in a lake level that is above the dam's spillway crest only about half as many days in the future compared to historical frequencies. Managing temperature downstream of Detroit Dam depends on the ability to blend warmer water from the lake's surface with cooler water from deep in the lake, and the spillway is an important release point near the lake's surface. Annual average in-lake and release temperatures from Detroit Lake warmed 1.1 °C and 1.5 °C from base to future periods under present-day dam operational rules and fill schedules. Simulated dam operations such as beginning refill of the lake 30 days earlier or reducing minimum release rates (to keep more water in the lake to retain the use of the spillway) mitigated future warming to 0.4 and 0.9 °C below existing operational scenarios during the critical autumn spawning period for endangered salmonids. A hypothetical floating surface withdrawal at Detroit Dam improved temperature control in summer and autumn (0.6 °C warmer in summer, 0.6 °C cooler in autumn compared to existing structures) without altering release rates or lake level management rules.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hanrahan, Timothy P.; Richmond, Marshall C.; Arntzen, Evan V.
2007-11-13
This report describes research conducted by the Pacific Northwest National Laboratory for the Bonneville Power Administration (BPA) as part of the Fish and Wildlife Program directed by the Northwest Power and Conservation Council. The study evaluated the restoration potential of Snake River fall Chinook salmon spawning habitat within the impounded lower Snake River. The objective of the research was to determine if hydroelectric dam operations could be modified, within existing system constraints (e.g., minimum to normal pool levels; without partial removal of a dam structure), to increase the amount of available fall Chinook salmon spawning habitat in the lower Snakemore » River. Empirical and modeled physical habitat data were used to compare potential fall Chinook salmon spawning habitat in the Snake River, under current and modified dam operations, with the analogous physical characteristics of an existing fall Chinook salmon spawning area in the Columbia River. The two Snake River study areas included the Ice Harbor Dam tailrace downstream to the Highway 12 bridge and the Lower Granite Dam tailrace downstream approximately 12 river kilometers. These areas represent tailwater habitat (i.e., riverine segments extending from a dam downstream to the backwater influence from the next dam downstream). We used a reference site, indicative of current fall Chinook salmon spawning areas in tailwater habitat, against which to compare the physical characteristics of each study site. The reference site for tailwater habitats was the section extending downstream from the Wanapum Dam tailrace on the Columbia River. Fall Chinook salmon spawning habitat use data, including water depth, velocity, substrate size and channelbed slope, from the Wanapum reference area were used to define spawning habitat suitability based on these variables. Fall Chinook salmon spawning habitat suitability of the Snake River study areas was estimated by applying the Wanapum reference reach habitat suitability criteria to measured and modeled habitat data from the Snake River study areas. Channel morphology data from the Wanapum reference reach and the Snake River study areas were evaluated to identify geomorphically suitable fall Chinook salmon spawning habitat. The results of this study indicate that a majority of the Ice Harbor and Lower Granite study areas contain suitable fall Chinook salmon spawning habitat under existing hydrosystem operations. However, a large majority of the currently available fall Chinook salmon spawning habitat in the Ice Harbor and Lower Granite study areas is of low quality. The potential for increasing, through modifications to hydrosystem operations (i.e., minimum pool elevation of the next downstream dam), the quantity or quality of fall Chinook salmon spawning habitat appears to be limited. Estimates of the amount of potential fall Chinook salmon spawning habitat in the Ice Harbor study area decreased as the McNary Dam forebay elevation was lowered from normal to minimum pool elevation. Estimates of the amount of potential fall Chinook salmon spawning habitat in the Lower Granite study area increased as the Little Goose Dam forebay elevation was lowered from normal to minimum pool elevation; however, 97% of the available habitat was categorized within the range of lowest quality. In both the Ice Harbor and Lower Granite study areas, water velocity appears to be more of a limiting factor than water depth for fall Chinook salmon spawning habitat, with both study areas dominated by low-magnitude water velocity. The geomorphic suitability of both study areas appears to be compromised for fall Chinook salmon spawning habitat, with the Ice Harbor study area lacking significant bedforms along the longitudinal thalweg profile and the Lower Granite study area lacking cross-sectional topographic diversity. To increase the quantity of available fall Chinook salmon spawning habitat in the Ice Harbor and Lower Granite study area, modifications to hydroelectric dam operations beyond those evaluated in this study likely would be necessary. Modifications may include operational and structural changes, such as lowering downstream dam forebay elevations to less than minimum pool. There is a large amount of uncertainty as to whether or not such modifications could increase the quantity of available fall Chinook salmon spawning habitat in the Ice Harbor and Lower Granite study area. The results from this study provide some certainty that the quantity and quality of fall Chinook salmon spawning habitat within the lower Snake River are not likely to be increased within the existing hydroelectric dam operations.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
McManamay, Ryan A
2014-01-01
Despite the ubiquitous existence of dams within riverscapes, much of our knowledge about dams and their environmental effects remains context-specific. Hydrology, more than any other environmental variable, has been studied in great detail with regard to dam regulation. While much progress has been made in generalizing the hydrologic effects of regulation by large dams, many aspects of hydrology show site-specific fidelity to dam operations, small dams (including diversions), and regional hydrologic regimes. A statistical modeling framework is presented to quantify and generalize hydrologic responses to varying degrees of dam regulation. Specifically, the objectives were to 1) compare the effects ofmore » local versus cumulative dam regulation, 2) determine the importance of different regional hydrologic regimes in influencing hydrologic responses to dams, and 3) evaluate how different regulation contexts lead to error in predicting hydrologic responses to dams. Overall, model performance was poor in quantifying the magnitude of hydrologic responses, but performance was sufficient in classifying hydrologic responses as negative or positive. Responses of some hydrologic indices to dam regulation were highly dependent upon hydrologic class membership and the purpose of the dam. The opposing coefficients between local and cumulative-dam predictors suggested that hydrologic responses to cumulative dam regulation are complex, and predicting the hydrology downstream of individual dams, as opposed to multiple dams, may be more easy accomplished using statistical approaches. Results also suggested that particular contexts, including multipurpose dams, high cumulative regulation by multiple dams, diversions, close proximity to dams, and certain hydrologic classes are all sources of increased error when predicting hydrologic responses to dams. Statistical models, such as the ones presented herein, show promise in their ability to model the effects of dam regulation effects at large spatial scales as to generalize the directionality of hydrologic responses.« less
Deng, Zhiqun; Carlson, Thomas J.; Duncan, Joanne P.; ...
2010-10-13
Hydropower is the largest renewable energy resource in the United States and the world. However, hydropower dams have adverse ecological impacts because migrating fish may be injured or killed when they pass through hydroturbines. In the Columbia and Snake River basins, dam operators and engineers are required to make those hydroelectric facilities more fish-friendly through changes in hydroturbine design and operation after fish population declines and the subsequent listing of several species of Pacific salmon under the Endangered Species Act of 1973. Public Utility District No. 2 of Grant County, Washington, requested authorization from the Federal Energy Regulatory Commission tomore » replace the ten turbines at Wanapum Dam with advanced hydropower turbines designed to improve survival for fish passing through the turbines while improving operation efficiency and increasing power generation. As an additional measure to the primary metric of direct injury and mortality rates of juvenile Chinook salmon using balloon tag-recapture methodology, this study used an autonomous sensor device - the Sensor Fish - to provide insight into the specific hydraulic conditions and physical stresses experienced by the fish as well as the specific causes of fish biological response. We found that the new hydroturbine blade shape and the corresponding reduction of turbulence in the advanced hydropower turbine were effective in meeting the objectives of improving fish survival while enhancing operational efficiency of the dam. The frequency of severe events based on Sensor Fish pressure and acceleration measurements showed trends similar to those of fish survival determined by the balloon tag-recapture methodology. In addition, the new turbine provided a better pressure and rate of pressure change environment for fish passage. Altogether, the Sensor Fish data indicated that the advanced hydroturbine design improved passage of juvenile salmon at Wanapum Dam.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-22
... the feasibility of the Paint Creek Dam Project No. 13633, to be located at the existing Paint Creek Dam on Paint Creek, in Highland County, Ohio. The Paint Creek Dam is owned and operated by the U.S.... Applicant Contact: Randall Smith, 4950 Frazeysburg Road, Zanesville, OH 43701, (740) 891-5424. [[Page 13528...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-29
... construction by SWCD of the proposed Narrows Dam and reservoir, a non-Federal project to be located on... conditions in the affected areas without further development and assumes that irrigation operations would... construction of the 17,000 acre-foot Narrows Dam and reservoir on Gooseberry Creek, pipelines to deliver the...
NASA Astrophysics Data System (ADS)
Skalak, K. J.; Pizzuto, J. E.; Jenkins, P.
2003-12-01
The potential downstream effects of dam removal were assessed on fifteen sites of varying dam size and characteristics in Pennsylvania and Maryland. The dams ranged in size from a 30 cm high fish weir to a water supply dam 57 m high. Stream order ranged from 1 to 4. The dams are located in watersheds with varying degrees of human disturbance and urbanization. The dams are also operated differently, with significant consequences for hydraulic residence time and downstream flow variability. Most streams were alluvial, but 6 of the reaches were clearly bedrock channels. We hypothesize that the channel upstream, which is unaffected by the dam, will provide an accurate model for the channel downstream of the dam long after dam removal. Therefore, reaches upstream and downstream of the dam were compared to determine the effects of the dam as well as the condition of the stream that will ultimately develop decades after dam removal. Surprisingly, the dams had no consistent influence on channel morphology. However, the percentage of sand is significantly lower downstream than upstream: the mean % sand downstream is 11.47%, while the mean % sand upstream is 21.39%. The coarser fractions of the bed, as represented by the 84th percentile grain diameter, are unaffected by the presence of the dam. These results imply that decades after dam removal, the percentage of sand on the bed will increase, but the coarse fraction of the bed will remain relatively unchanged.
Landslides and Earthquake Lakes from the Wenchuan, China Earthquake - Can it Happen in the U.S.?
NASA Astrophysics Data System (ADS)
Stenner, H.; Cydzik, K.; Hamilton, D.; Cattarossi, A.; Mathieson, E.
2008-12-01
The May 12, 2008 M7.9 Wenchuan, China earthquake destroyed five million homes and schools, causing over 87,650 deaths. Landslides, a secondary effect of the shaking, caused much of the devastation. Debris flows buried homes, rock falls crushed cars, and landslides dammed rivers. Blocked roads greatly impeded emergency access, delaying response. Our August 2008 field experience in the affected area reminded us that the western United States faces serious risks posed by earthquake-induced landslides. The topography of the western U.S. is less extreme than that near Wenchuan, but earthquakes may still cause devastating landslides, damming rivers and blocking access to affected areas. After the Wenchuan earthquake, lakes rapidly rose behind landslide dams, threatening millions of lives. One landslide above Beichuan City created Tangjiashan Lake, a massive body of water upstream of Mianyang, an area with 5.2 million people, 30,000 of whom were killed in the quake. Potential failure of the landslide dam put thousands more people at risk from catastrophic flooding. In 1959, the M7.4 Hebgen Lake earthquake in Montana caused a large landslide, which killed 19 people and dammed the Madison River. The Army Corps excavated sluices to keep the dam from failing catastrophically. The Hebgen Lake earthquake ultimately caused 28 deaths, mostly from landslides, but the affected region was sparsely populated. Slopes prone to strong earthquake shaking and landslides in California, Washington, and Oregon have much larger populations at risk. Landslide hazards continue after the earthquake due to the effect strong shaking has on hillslopes, particularly when subjected to subsequent rain. These hazards must be taken into account. Once a landslide blocks a river, rapid and thoughtful action is needed. The Chinese government quickly and safely mitigated landslide dams that posed the greatest risk to people downstream. It took expert geotechnical advice, the speed and resources of the army, and some luck. It would pay to learn from their success.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-30
... Management Plan for the Operation of Glen Canyon Dam AGENCY: Bureau of Reclamation and National Park Service... Impact Statement (EIS) for Adoption of a Long-term Experimental and Management Plan (LTEMP) for the Operation of Glen Canyon Dam to January 31, 2012. The Notice to Solicit Comments and Hold Public Scoping...
Anderson, Elizabeth P.; Freeman, Mary C.; Pringle, C.M.
2006-01-01
Small dams for hydropower have caused widespread alteration of Central American rivers, yet much of recent development has gone undocumented by scientists and conservationists. We examined the ecological effects of a small hydropower plant (Dona Julia Hydroelectric Center) on two low-order streams (the Puerto Viejo River and Quebradon stream) draining a mountainous area of Costa Rica. Operation of the Dona Julia plant has dewatered these streams, reducing discharge to ~ 10% of average annual flow. This study compared fish assemblage composition and aquatic habitat upstream and downstream of diversion dams on two streams and along a ~ 4 km dewatered reach of the Puerto Viejo River in an attempt to evaluate current instream flow recommendations for regulated Costa Rican streams. Our results indicated that fish assemblages directly upstream and downstream of the dam on the third order Puerto Viejo River were dissimilar, suggesting that the small dam (< 15 in high) hindered movement of fishes. Along the ~ 4 km dewatered reach of the Puerto Viejo River, species count increased with downstream distance from the dam. However, estimated species richness and overall fish abundance were not significantly correlated with downstream distance from the dam. Our results suggested that effects of stream dewatering may be most pronounced for a subset of species with more complex reproductive requirements, classified as equilibrium-type species based on their life-history. In the absence of changes to current operations, we expect that fish assemblages in the Puerto Viejo River will be increasingly dominated by opportunistic-type, colonizing fish species. Operations of many other small hydropower plants in Costa Rica and other parts of Central America mirror those of Doha Julia; the methods and results of this study may be applicable to some of those projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mackey, Dennis L.; Gregory, Shari K.; Matthews, William C. Jr.
Kerr Hydroelectric Dam is located at the south end of Flathead Lake, controls water levels on the lake and the Flathead River below the dam, and is currently operated as a load control facility. Current operation of Kerr Dam creates the greatest yearly water level fluctuations on both the lake and river during the Canada goose (Branta canadensis moffitti) brood and nesting period. Data collected from 1980-1982 indicated that goose nest numbers on the river were lower than during the 1950's, and that brood habitat on the lake may be limiting the goose population there. Our study was conducted frommore » 1983-1987 to determine the effects of Kerr Dam operation on Canada goose populations and habitat on the south half of Flathead Lake and the Flathead River, and to formulate management and mitigation recommendations. Nesting geese on the river appeared to be negatively affected by a lack of nest sites free from predators, and responded to available artificial nest structures with an increase in nest numbers and nesting success. Under current dam operation, river channel depths and widths do not discourage access to nesting islands by mammalian predators during some years and high predation on ground nests occurs. Intensively used brood areas on the lake and river were identified and described. Brood habitat on the lake was lower in quality and quantity than on the river due to dam operations. Gosling mortality on the lake was high, almost 2 times higher than on the river. Lake broods expended more energy obtaining food than river broods. Losses of brood habitat in the form of wet meadow marshes were documented and mitigation options developed. Management/mitigation alternatives and monitoring methods for nesting and brooding geese were identified.« less
Himalayan Lake- and River-Impacting Landslides and Ice Avalanches: Some So Deadly, Some No Problem
NASA Astrophysics Data System (ADS)
Kargel, J. S.; Karki, A.; Haritashya, U. K.; Shugar, D. H.; Harrison, S.
2017-12-01
Scientific attention to landslides and ice avalanches in Nepal was heightened by the 2015 Gorkha earthquake. However, landslides and ice avalanches— some deadly— are frequent in this mountainous, glacierized country and across High Mountain Asia. River blocking landslides (RBLs) often create dangerous situations due to upstream impoundments and downstream landslide dammed outburst floods (LDOFs). Factors affecting RBL hazards include: Volumes and masses of ice, rock, and water; shape factors of the valley and landslide; grain size-frequency distribution; river hydrograph; and seasonal and weather factors. These factors affect processes such as slumping and erosion of the RBL by overflow or piping, buoyant lifting of dam material, melting of a landslide ice core, liquefaction, overfill overtopping or tsunami overtopping by subsequent landslides into the impoundment, and the volume and peak discharge of an LDOF. Not all processes aggravate hazards; a high ice:rock ratio, for example, can result in immediate tunneling by the river with no subsequent impoundment. A dam composed of mainly boulders with few fines likewise can prevent effective damming; however, a wide spectrum of the particle-size-distribution can make a long-lasting, benign dam. The most hazardous RBLs include those creating large dams and rapidly-filled impoundments, but which can rapidly and catastrophically break up, especially at sites of repeated terrain collapses. The particle size-frequency of a landslide dam depends substantially on bedrock lithology and structure. Vulnerabilities and warning times also affect whether an upstream impoundment flood or LDOF will exert a large toll. For landslide susceptibility assessments, usual treatments involving mountain slopes, valley shape, and seismic activity should be complemented by quantitative measures of bedrock lithology and weathering state, the potential energy and distribution of unstable masses, and recorded historic or prehistoric RBLs in the same area. Factors for landslide triggering of glacial lake outburst floods (GLOFs) include some of the same factors, but the mass/energy input rate into the lake, the lake's shape and length, and moraine dam properties are also important in GLOF triggering. Himalayan examples will illustrate some hazard factors.
Hydropower, an energy source whose time has come again
NASA Astrophysics Data System (ADS)
1980-01-01
Recent price increases in imported oil demonstrate the urgency for the U.S. to rapidly develop its renewable resources. One such renewable resource for which technology is available now is hydropower. Studies indicate that hydropower potential, particularly at existing dam sites, can save the county hundreds of thousands of barrels of oil per day. But problems and constraints-economic, environmental, institutional, and operational-limit is full potential. Federal programs have had little impact on helping to bring hydro projects on line. Specifically, the Department of Energy's Small Hydro Program could do more to overcome hydro constraints and problems through an effective outreach program and more emphasis on demonstration projects.
NASA Astrophysics Data System (ADS)
Jeuland, Marc; Whittington, Dale
2014-03-01
This article presents a methodology for planning new water resources infrastructure investments and operating strategies in a world of climate change uncertainty. It combines a real options (e.g., options to defer, expand, contract, abandon, switch use, or otherwise alter a capital investment) approach with principles drawn from robust decision-making (RDM). RDM comprises a class of methods that are used to identify investment strategies that perform relatively well, compared to the alternatives, across a wide range of plausible future scenarios. Our proposed framework relies on a simulation model that includes linkages between climate change and system hydrology, combined with sensitivity analyses that explore how economic outcomes of investments in new dams vary with forecasts of changing runoff and other uncertainties. To demonstrate the framework, we consider the case of new multipurpose dams along the Blue Nile in Ethiopia. We model flexibility in design and operating decisions—the selection, sizing, and sequencing of new dams, and reservoir operating rules. Results show that there is no single investment plan that performs best across a range of plausible future runoff conditions. The decision-analytic framework is then used to identify dam configurations that are both robust to poor outcomes and sufficiently flexible to capture high upside benefits if favorable future climate and hydrological conditions should arise. The approach could be extended to explore design and operating features of development and adaptation projects other than dams.
Climate change and the global pattern of moraine-dammed glacial lake outburst floods
NASA Astrophysics Data System (ADS)
Harrison, Stephan; Kargel, Jeffrey S.; Huggel, Christian; Reynolds, John; Shugar, Dan H.; Betts, Richard A.; Emmer, Adam; Glasser, Neil; Haritashya, Umesh K.; Klimeš, Jan; Reinhardt, Liam; Schaub, Yvonne; Wiltshire, Andy; Regmi, Dhananjay; Vilímek, Vít
2018-04-01
Despite recent research identifying a clear anthropogenic impact on glacier recession, the effect of recent climate change on glacier-related hazards is at present unclear. Here we present the first global spatio-temporal assessment of glacial lake outburst floods (GLOFs) focusing explicitly on lake drainage following moraine dam failure. These floods occur as mountain glaciers recede and downwaste. GLOFs can have an enormous impact on downstream communities and infrastructure. Our assessment of GLOFs associated with the rapid drainage of moraine-dammed lakes provides insights into the historical trends of GLOFs and their distributions under current and future global climate change. We observe a clear global increase in GLOF frequency and their regularity around 1930, which likely represents a lagged response to post-Little Ice Age warming. Notably, we also show that GLOF frequency and regularity - rather unexpectedly - have declined in recent decades even during a time of rapid glacier recession. Although previous studies have suggested that GLOFs will increase in response to climate warming and glacier recession, our global results demonstrate that this has not yet clearly happened. From an assessment of the timing of climate forcing, lag times in glacier recession, lake formation and moraine-dam failure, we predict increased GLOF frequencies during the next decades and into the 22nd century.
Circuitous to single thread: post-dam geomorphic transformation of the Colorado River in its delta
NASA Astrophysics Data System (ADS)
Mueller, E. R.; Schmidt, J. C.
2017-12-01
The Colorado River in its delta has transformed from a maze of secondary and distributary channels to an intermittent or ephemeral stream largely disconnected from formerly active channels and floodplains. Periodic post-dam floods have demonstrated that channel migration and shifting during floods increased the extent and diversity of riparian vegetation, and suggested that restoration of fluvial processes that promote re-activation of these former channels may enhance ecosystem rehabilitation. But restoration efforts in the delta are complicated by the fact that the Colorado River has the largest reservoir size in relation to its mean annual flow of any large river in North America and most of its sediment supply is completely blocked in upstream reservoirs. As a result, small controlled floods intended to inundate formerly active channels and rejuvenate riparian vegetation must consider the new relationship between stream flow and the delta's transformed geomorphology. Post-dam channel change has been dominated by the abandonment of secondary and distributary channels, with 3 to 4 meters of bed incision in the upstream part of the delta that diminishes downstream. Initial bed incision of 2 to 3 meters occurred rapidly following completion of Hoover Dam in 1936, before further upstream water development reduced delta flows to near zero by the mid-1960s. The largest post-dam floods occurred in the 1980s, which resulted in 10s to 100s of meters of lateral migration, channel switching, and the reactivation of secondary channels and floodplains rarely inundated since dam completion. Smaller flow pulses in the 1990s and 2000s further incised the thalweg to its minimum elevation, resulting in a narrow single-thread channel inset within the multi-channel surface active during the 1980s. In 2014, an experimental pulse flow was released to the river channel with a peak discharge approximately 5% of the typical pre-dam flood peak. Topographic change was confined to the main channel where post-dam bed incision resulted in larger depths and flow velocities, although some secondary channels were inundated. Post-dam channel incision, combined with the rapid downstream loss of flow through infiltration, has reduced the area where secondary channels might be formed or re-activated during small controlled floods in the delta.
NASA Astrophysics Data System (ADS)
Rosero-Lopez, D.; Flecker, A.; Walter, M. T.
2016-12-01
Water resources in South America have been clearly targeted as key sources for hydropower expansion over the next 30 years. Ecuador, among the most biologically diverse countries in the world, has the highest density of hydropower dams, either operational, under construction, or planned, in the Amazon Basin. Ecuador's ambitious plan to change its energy portfolio is conceived to satisfy the country's demand and to empower the country to be the region's first hydroelectric energy exporter. The Santiago watershed located in the southeast part of the country has 39 facilities either under construction or in operation. The Santiago River and its main tributaries (Zamora and Upano) are expected to be impounded by large dams over the next 10 years. In order to understand the magnitude and potential impacts of regional dam development on hydrological regimes, a 35-year historical data set of stream discharge was analyzed. We examined flow regimes for time series between the construction of each dam, starting with the oldest and largest built in 1982 up until the most recent dam built in 2005. Preliminary results indicate a systematic displacement in flow seasonality following post-dam compared to pre-dam conditions. There are also notable differences in the distributions of peaks and pulses in post-dam flows. The range of changes from these results shows that punctuated and cumulative impacts are related to the size of each new impoundment. These observations and their implications to the livelihoods, biota, and ecosystems services in the Santiago watershed need to be incorporated into a broader cost-benefit analysis of hydropower generation in the western Amazon Basin.
Turbid releases from Glen Canyon Dam, Arizona, following rainfall-runoff events of September 2013
Wildman, Richard A.; Vernieu, William
2017-01-01
Glen Canyon Dam is a large dam on the Colorado River in Arizona. In September 2013, it released turbid water following intense thunderstorms in the surrounding area. Turbidity was >15 nephelometric turbidity units (NTU) for multiple days and >30 NTU at its peak. These unprecedented turbid releases impaired downstream fishing activity and motivated a rapid-response field excursion. At 5 locations upstream from the dam, temperature, specific conductance, dissolved oxygen, chlorophyll a, and turbidity were measured in vertical profiles. Local streamflow and rainfall records were retrieved, and turbidity and specific conductance data in dam releases were evaluated. Profiling was conducted to determine possible sources of turbidity from 3 tributaries nearest the dam, Navajo, Antelope, and Wahweap creeks, which entered Lake Powell as interflows during this study. We discuss 4 key conditions that must have been met for tributaries to influence turbidity of dam releases: tributary flows must have reached the dam, tributary flows must have been laden with sediment, inflow currents must have been near the depth of dam withdrawals, and the settling velocity of particles must have been slow. We isolate 2 key uncertainties that reservoir managers should resolve in future similar studies: the reach of tributary water into the reservoir thalweg and the distribution of particle size of suspended sediment. These uncertainties leave the source of the turbidity ambiguous, although an important role for Wahweap Creek is possible. The unique combination of limnological factors we describe implies that turbid releases at Glen Canyon Dam will continue to be rare.
7. Photographic copy of the original construction drawing, dated June ...
7. Photographic copy of the original construction drawing, dated June 1934, from the linens in possession of U.S. Army Engineers, Rock Island District, Clock Tower Building, Arsenal Island, Rock Island, Illinois. MISSISSIPPI RIVER, LOCK AND DAM NO. 15, LOCK OPERATOR'S SHELTER HOUSE, ELEVATIONS AND PLANS - Locks & Dam No. 15, Locks Operator's Shelter House, Arsenal Island, Upper Mississippi River, Rock Island, Rock Island County, IL
8. Photographic copy of the original construction drawing dated June ...
8. Photographic copy of the original construction drawing dated June 1934, from the linens in possession of U.S. Army Engineers, Rock Island District, Clock Tower Building, Arsenal Island, Rock Island, Illinois. MISSISSIPPI RIVER, LOCK AND DAM NO. 15, LOCK OPERATOR'S SHELTER HOUSE, SECTIONS AND DETAILS - Locks & Dam No. 15, Locks Operator's Shelter House, Arsenal Island, Upper Mississippi River, Rock Island, Rock Island County, IL
Channel evolution on the dammed Elwha River, Washington, USA
Draut, A.E.; Logan, J.B.; Mastin, M.C.
2011-01-01
Like many rivers in the western U.S., the Elwha River, Washington, has changed substantially over the past century in response to natural and human forcing. The lower river is affected by two upstream dams that are slated for removal as part of a major river restoration effort. In preparation for studying the effects of dam removal, we present a comprehensive field and aerial photographic analysis of dam influence on an anabranching, gravel-bed river. Over the past century with the dams in place, loss of the upstream sediment supply has caused spatial variations in the sedimentary and geomorphic character of the lower Elwha River channel. Bed sediment is armored and better sorted than on the naturally evolving bed upstream of the dams. On time scales of flood seasons, the channel immediately below the lower dam is fairly stable, but progresses toward greater mobility downstream such that the lowermost portion of the river responded to a recent 40-year flood with bank erosion and bed-elevation changes on a scale approaching that of the natural channel above the dams. In general, channel mobility in the lowest 4 km of the Elwha River has not decreased substantially with time. Enough fine sediment remains in the floodplain that – given sufficient flood forcing – the channel position, sinuosity, and braiding index change substantially. The processes by which this river accesses new fine sediment below the dams (rapid migration into noncohesive banks and avulsion of new channels) allow it to compensate for loss of upstream sediment supply more readily than would a dammed river with cohesive banks or a more limited supply of alluvium. The planned dam removal will provide a valuable opportunity to evaluate channel response to the future restoration of natural upstream sediment supply.
Dam nation: A geographic census of American dams and their large-scale hydrologic impacts
NASA Astrophysics Data System (ADS)
Graf, William L.
1999-04-01
Newly available data indicate that dams fragment the fluvial system of the continental United States and that their impact on river discharge is several times greater than impacts deemed likely as a result of global climate change. The 75,000 dams in the continental United States are capable of storing a volume of water almost equaling one year's mean runoff, but there is considerable geographic variation in potential surface water impacts. In some western mountain and plains regions, dams can store more than 3 year's runoff, while in the Northeast and Northwest, storage is as little as 25% of the annual runoff. Dams partition watersheds; the drainage area per dam varies from 44 km2 (17 miles2) per dam in New England to 811 km2 (313 miles2) per dam in the Lower Colorado basin. Storage volumes, indicators of general hydrologic effects of dams, range from 26,200 m3 km-2 (55 acre-feet mile-2) in the Great Basin to 345,000 m3 km-2 (725 acre-feet mile-2) in the South Atlantic region. The greatest river flow impacts occur in the Great Plains, Rocky Mountains, and the arid Southwest, where storage is up to 3.8 times the mean annual runoff. The nation's dams store 5000 m3 (4 acre-feet) of water per person. Water resource regions have experienced individualized histories of cumulative increases in reservoir storage (and thus of downstream hydrologic and ecologic impacts), but the most rapid increases in storage occurred between the late 1950s and the late 1970s. Since 1980, increases in storage have been relatively minor.
43 CFR 418.23 - Diversion of Rock Dam Ditch water.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Operations and Management § 418.23 Diversion of Rock Dam Ditch water. Project water may be diverted directly... Lahontan Reservoir. Such diversions will require the prior written approval of the Bureau and be used in...
43 CFR 418.23 - Diversion of Rock Dam Ditch water.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Operations and Management § 418.23 Diversion of Rock Dam Ditch water. Project water may be diverted directly... Lahontan Reservoir. Such diversions will require the prior written approval of the Bureau and be used in...
Are large-scale flow experiments informing the science and management of freshwater ecosystems?
Olden, Julian D.; Konrad, Christopher P.; Melis, Theodore S.; Kennard, Mark J.; Freeman, Mary C.; Mims, Meryl C.; Bray, Erin N.; Gido, Keith B.; Hemphill, Nina P.; Lytle, David A.; McMullen, Laura E.; Pyron, Mark; Robinson, Christopher T.; Schmidt, John C.; Williams, John G.
2013-01-01
Greater scientific knowledge, changing societal values, and legislative mandates have emphasized the importance of implementing large-scale flow experiments (FEs) downstream of dams. We provide the first global assessment of FEs to evaluate their success in advancing science and informing management decisions. Systematic review of 113 FEs across 20 countries revealed that clear articulation of experimental objectives, while not universally practiced, was crucial for achieving management outcomes and changing dam-operating policies. Furthermore, changes to dam operations were three times less likely when FEs were conducted primarily for scientific purposes. Despite the recognized importance of riverine flow regimes, four-fifths of FEs involved only discrete flow events. Over three-quarters of FEs documented both abiotic and biotic outcomes, but only one-third examined multiple taxonomic responses, thus limiting how FE results can inform holistic dam management. Future FEs will present new opportunities to advance scientifically credible water policies.
Liebenberg, W H
1994-01-01
While it is arguable that the operative procedures depicted in this article could have been done equally well with alternative forms of isolation, it is indisputable that rubber dam provides for the most thorough 'isolation' in the comprehensive sense of the term. It allows for the finite control over peripheral variables such as access and controlled gingival retraction. This in turn permits meticulous execution of restorative procedures within the luxury of 'true four-handed dentistry'. Most operative procedures are done within the limitations of single handed dentistry as the other 'three hands' are involved with retraction, fluid evacuation and access control. The rubber dam is indeed indispensable and with the increased awareness of infection control it is conceivable that rubber dam isolation will continue to be associated with quality patient care. Part 2 of this article will detail the application of the 'Modified Gingival Retractor' in the isolation of cervical lesions.
Thermal effects of dams in the Willamette River basin, Oregon
Rounds, Stewart A.
2010-01-01
Methods were developed to assess the effects of dams on streamflow and water temperature in the Willamette River and its major tributaries. These methods were used to estimate the flows and temperatures that would occur at 14 dam sites in the absence of upstream dams, and river models were applied to simulate downstream flows and temperatures under a no-dams scenario. The dams selected for this study include 13 dams built and operated by the U.S. Army Corps of Engineers (USACE) as part of the Willamette Project, and 1 dam on the Clackamas River owned and operated by Portland General Electric (PGE). Streamflows in the absence of upstream dams for 2001-02 were estimated for USACE sites on the basis of measured releases, changes in reservoir storage, a correction for evaporative losses, and an accounting of flow effects from upstream dams. For the PGE dam, no-project streamflows were derived from a previous modeling effort that was part of a dam-relicensing process. Without-dam streamflows were characterized by higher peak flows in winter and spring and much lower flows in late summer, as compared to with-dam measured flows. Without-dam water temperatures were estimated from measured temperatures upstream of the reservoirs (the USACE sites) or derived from no-project model results (the PGE site). When using upstream data to estimate without-dam temperatures at dam sites, a typical downstream warming rate based on historical data and downstream river models was applied over the distance from the measurement point to the dam site, but only for conditions when the temperature data indicated that warming might be expected. Regressions with measured temperatures from nearby or similar sites were used to extend the without-dam temperature estimates to the entire 2001-02 time period. Without-dam temperature estimates were characterized by a more natural seasonal pattern, with a maximum in July or August, in contrast to the measured patterns at many of the tall dam sites where the annual maximum temperature typically occurred in September or October. Without-dam temperatures also tended to have more daily variation than with-dam temperatures. Examination of the without-dam temperature estimates indicated that dam sites could be grouped according to the amount of streamflow derived from high-elevation, spring-fed, and snowmelt-driven areas high in the Cascade Mountains (Cougar, Big Cliff/Detroit, River Mill, and Hills Creek Dams: Group A), as opposed to flow primarily derived from lower-elevation rainfall-driven drainages (Group B). Annual maximum temperatures for Group A ranged from 15 to 20 degree(s)C, expressed as the 7-day average of the daily maximum (7dADM), whereas annual maximum 7dADM temperatures for Group B ranged from 21 to 25 degrees C. Because summertime stream temperature is at least somewhat dependent on the upstream water source, it was important when estimating without-dam temperatures to use correlations to sites with similar upstream characteristics. For that reason, it also is important to maintain long-term, year-round temperature measurement stations at representative sites in each of the Willamette River basin's physiographic regions. Streamflow and temperature estimates downstream of the major dam sites and throughout the Willamette River were generated using existing CE-QUAL-W2 flow and temperature models. These models, originally developed for the Willamette River water-temperature Total Maximum Daily Load process, required only a few modifications to allow them to run under the greatly reduced without-dam flow conditions. Model scenarios both with and without upstream dams were run. Results showed that Willamette River streamflow without upstream dams was reduced to levels much closer to historical pre-dam conditions, with annual minimum streamflows approximately one-half or less of dam-augmented levels. Thermal effects of the dams varied according to the time of year, from cooling in mid-summer to warm
A Framework to Assess the Cumulative Hydrological Impacts of Dams on flow Regime
NASA Astrophysics Data System (ADS)
Wang, Y.; Wang, D.
2016-12-01
In this study we proposed a framework to assess the cumulative impact of dams on hydrological regime, and the impacts of the Three Gorges Dam on flow regime in Yangtze River were investigated with the framework. We reconstructed the unregulated flow series to compare with the regulated flow series in the same period. Eco-surplus and eco-deficit and the Indicators of Hydrologic Alteration parameters were used to examine the hydrological regime change. Among IHA parameters, Wilcoxon signed-rank test and Principal Components Analysis identified the representative indicators of hydrological alterations. Eco-surplus and eco-deficit showed that the reservoir also changed the seasonal regime of the flows in autumn and winter. Annual extreme flows and October flows changes lead to negative ecological implications downstream from the Three Gorges Dam. Ecological operation for the Three Gorges Dam is necessary to mitigate the negative effects on the river ecosystem in the middle reach of Yangtze River. The framework proposed here could be a robust method to assess the cumulative impacts of reservoir operation.
Geomorphic response of the Sandy River, Oregon, to removal of Marmot Dam
Major, Jon J.; O'Connor, Jim E.; Podolak, Charles J.; Keith, Mackenzie K.; Grant, Gordon E.; Spicer, Kurt R.; Pittman, Smokey; Bragg, Heather M.; Wallick, J. Rose; Tanner, Dwight Q.; Rhode, Abagail; Wilcock, Peter R.
2012-01-01
The October 2007 breaching of a temporary cofferdam constructed during removal of the 15-meter (m)-tall Marmot Dam on the Sandy River, Oregon, triggered a rapid sequence of fluvial responses as ~730,000 cubic meters (m3) of sand and gravel filling the former reservoir became available to a high-gradient river. Using direct measurements of sediment transport, photogrammetry, airborne light detection and ranging (lidar) surveys, and, between transport events, repeat ground surveys of the reservoir reach and channel downstream, we monitored the erosion, transport, and deposition of this sediment in the hours, days, and months following breaching of the cofferdam. Rapid erosion of reservoir sediment led to exceptional suspended-sediment and bedload-sediment transport rates near the dam site, as well as to elevated transport rates at downstream measurement sites in the weeks and months after breaching. Measurements of sediment transport 0.4 kilometers (km) downstream of the dam site during and following breaching show a spike in the transport of fine suspended sediment within minutes after breaching, followed by high rates of suspended-load and bedload transport of sand. Significant transport of gravel bedload past the measurement site did not begin until 18 to 20 hours after breaching. For at least 7 months after breaching, bedload transport rates just below the dam site during high flows remained as much as 10 times above rates measured upstream of the dam site and farther downstream. The elevated sediment load was derived from eroded reservoir sediment, which began eroding when a meters-tall knickpoint migrated about 200 m upstream in the first hour after breaching. Rapid knickpoint migration triggered vertical incision and bank collapse in unconsolidated sand and gravel, leading to rapid channel widening. Over the following days and months, the knickpoint migrated upstream more slowly, simultaneously decreasing in height and becoming less distinct. Within 7 months, the knickpoint had migrated 2 km upstream from the dam site and became a riffle-like feature approximately 1 m high and a few tens of meters long. Knickpoint migration, vertical incision, and lateral erosion evacuated about 15 percent of the initial reservoir volume (125,000 m3) within 60 hours following breaching, and by the end of the high flows in May 2008, about 50 percent of the volume had been evacuated. Large stormflows in November 2008 and January 2009 eroded another 6 percent of the original volume of impounded sediment. Little additional sediment eroded during the remainder of the second year following breaching. The rapid erosion of sediment by the modest flow that accompanied dam breaching was driven mainly by the steep hydraulic gradient associated with the abrupt change of base level and knickpoint formation and was aided by the unconsolidated and cohesionless character of the reservoir sediment. In the ensuing months, transport competence diminished as channel geometry evolved and the river gradient through the reservoir reach diminished. Changes in profile gradient in conjunction with channel coarsening and widening led to a rapid slowing of the rate of reservoir erosion. Sediment transport and deposition were strongly controlled by channel-gradient discontinuities and valley morphology downstream of the dam site. Those influences led to a strong divergence of sand and gravel transport and to deposition of a sediment wedge, as much as 4 m thick, that tapered to the preremoval channel bed 1.3 km downstream of the dam site. After 2 years, that deposit contained about 25 percent of the total volume of sediment eroded from the reservoir. The balance was distributed among pools within the Sandy River gorge, a narrow bedrock canyon extending 2 to 9 km downstream of the dam site, and along the channel farther downstream. A two-fraction sediment budget for the first year following breaching indicates that most of the gravel eroded from the reservoir reach was deposited within the sediment wedge and within the gorge, whereas eroded sand largely passed through the gorge and was broadly dispersed farther downstream. The sequence of transporting flows affected the specific trajectory of reservoir erosion and downstream sediment transport during the 2 years following breaching. However, because the overall erosion was largely a consequence of knickpoint retreat and channel widening, which in the 2 years after removal had affected most of the reservoir reach, it is unlikely that the specific sequence of flows significantly affected the overall outcome. Because the knickpoint had largely passed through the reservoir within 2 years, and the remaining reservoir sediment is mostly isolated high above armored or bedrock banks, it is unlikely that substantial additional sediment from the reservoir site will enter the system unless very large flows occur. Continued channel evolution downstream of the dam site is probable as deposits formed in the first 2 years are episodically mobilized. Below the Sandy River gorge, detection of effects related to release of reservoir sediment is challenging, especially in areas of sand deposition, because of the high background supply of sand in the river and substantial channel dynamism.
Velpuri, Naga Manohar; Senay, Gabriel B.
2012-01-01
Lake Turkana, the largest desert lake in the world, is fed by ungauged or poorly gauged river systems. To meet the demand of electricity in the East African region, Ethiopia is currently building the Gibe III hydroelectric dam on the Omo River, which supplies more than 80% of the inflows to Lake Turkana. On completion, the Gibe III dam will be the tallest dam in Africa with a height of 241 m. However, the nature of interactions and potential impacts of regulated inflows to Lake Turkana are not well understood due to its remote location and unavailability of reliable in-situ datasets. In this study, we used 12 years (1998–2009) of existing multi-source satellite and model-assimilated global weather data. We use calibrated multi-source satellite data-driven water balance model for Lake Turkana that takes into account model routed runoff, lake/reservoir evapotranspiration, direct rain on lakes/reservoirs and releases from the dam to compute lake water levels. The model evaluates the impact of Gibe III dam using three different approaches such as (a historical approach, a knowledge-based approach, and a nonparametric bootstrap resampling approach) to generate rainfall-runoff scenarios. All the approaches provided comparable and consistent results. Model results indicated that the hydrological impact of the dam on Lake Turkana would vary with the magnitude and distribution of rainfall post-dam commencement. On average, the reservoir would take up to 8–10 months, after commencement, to reach a minimum operation level of 201 m depth of water. During the dam filling period, the lake level would drop up to 2 m (95% confidence) compared to the lake level modelled without the dam. The lake level variability caused by regulated inflows after the dam commissioning were found to be within the natural variability of the lake of 4.8 m. Moreover, modelling results indicated that the hydrological impact of the Gibe III dam would depend on the initial lake level at the time of dam commencement. Areas along the Lake Turkana shoreline that are vulnerable to fluctuations in lake levels were also identified. This study demonstrates the effectiveness of using existing multi-source satellite data in a basic modeling framework to assess the potential hydrological impact of an upstream dam on a terminal downstream lake. The results obtained from this study could also be used to evaluate alternate dam-filling scenarios and assess the potential impact of the dam on Lake Turkana under different operational strategies.
Wright, Scott A.; Grams, Paul E.
2010-01-01
This report describes numerical modeling simulations of sand transport and sand budgets for reaches of the Colorado River below Glen Canyon Dam. Two hypothetical Water Year 2011 annual release volumes were each evaluated with six hypothetical operational scenarios. The six operational scenarios include the current operation, scenarios with modifications to the monthly distribution of releases, and scenarios with modifications to daily flow fluctuations. Uncertainties in model predictions were evaluated by conducting simulations with error estimates for tributary inputs and mainstem transport rates. The modeling results illustrate the dependence of sand transport rates and sand budgets on the annual release volumes as well as the within year operating rules. The six operational scenarios were ranked with respect to the predicted annual sand budgets for Marble Canyon and eastern Grand Canyon reaches. While the actual WY 2011 annual release volume and levels of tributary inputs are unknown, the hypothetical conditions simulated and reported herein provide reasonable comparisons between the operational scenarios, in a relative sense, that may be used by decision makers within the Glen Canyon Dam Adaptive Management Program.
Hydrological impact of high-density small dams in a humid catchment, Southeast China
NASA Astrophysics Data System (ADS)
Lu, W.; Lei, H.; Yang, D.
2017-12-01
The Jiulong River basin is a humid catchment with a drainage area of 14,741 km2; however, it has over 1000 hydropower stations within it. Such catchment with high-density small dams is scarce in China. Yet few is known about the impact of high-density small dams on streamflow changes. To what extent the large number of dams alters the hydrologic patterns is a fundamental scientific issue for water resources management, flood control, and aquatic ecological environment protection. Firstly, trend and change point analyses are applied to determine the characteristics of inter-annual streamflow. Based on the detected change point, the study period is divided into two study periods, the ``natural'' and ``disturbed'' periods. Then, a geomorphology-based hydrological model (GBHM) and the fixing-changing method are adopted to evaluate the relative contributions of climate variations and damming to the changes in streamflow at each temporal scale (i.e., from daily, monthly to annual). Based on the simulated natural streamflow, the impact of dam construction on hydrologic alteration and aquatic ecological environment will be evaluated. The hydrologic signatures that will be investigated include flood peak, seasonality of streamflow, and the inter-annual variability of streamflow. In particular, the impacts of damming on aquatic ecological environment will be investigated using eco-flow metrics and indicators of hydrologic alteration (IHA) which contains 33 individual streamflow statistics that are closely related to aquatic ecosystem. The results of this study expect to provide a reference for reservoir operation considering both ecological and economic benefits of such operations in the catchment with high-density dams.
A Study of the Impact of Dams on Streamflow and Sediment Retention in the Mekong River Basin
NASA Astrophysics Data System (ADS)
Munroe, T.; Anderson, E.; Markert, K. N.; Griffin, R.
2017-12-01
Dam construction in the Mekong Basin has many cascading effects on the ecology, economy, and hydrology of the surrounding region. Current studies that assess the hydrological impact of dams in the region focus on only one or a small subset (<10) of dams. The focus of this study is to utilize the Soil Water Assessment Tool (SWAT), a rainfall-runoff hydrologic model to determine change in streamflow and sedimentation in the Mekong Basin before and after the construction of dams. This study uses land cover land use and reservoir datasets created by the NASA SERVIR-Mekong Regional Land Cover Monitoring System and Dam Inundation Mapping Tool as inputs into the model. The study also builds on the capabilities of the SWAT model by using the sediment trapping efficiency (STE) equation from Brune (1953), rewritten by Kummu (2007), to calculate STE of dams and estimate change in sediment concentration downstream. The outputs from this study can be used to inform dam operation policies, study the correlation between dams and delta subsidence, and study the impact of dams on river fisheries, which are all pressing issues in the Mekong region.
2007-09-01
Configuration Consideration ...........................54 C. MAE NGAT DAM, CHIANG MAI , THAILAND, FIELD EXPERIMENT...2006 802.11 Network Topology Mae Ngat Dam, Chiang Mai , Thailand.......................39 Figure 31. View of COASTS 2006 802.11 Topology...Requirements (Background From Google Earth).....62 Figure 44. Mae Ngat Dam, Chiang Mai , Thailand (From Google Earth
Yu, Soon Ju; Lee, Jae Yil; Ha, Sung Ryong
2010-01-01
This article aims to describe the influence of diffuse pollution on the temporal and spatial characteristics of natural organic matter (NOM) in a stratified dam reservoir, the Daecheong Dam, on the basis of intensive observation results and the dynamic water quality simulation using CE-QUAL-W2. Turbidity is regarded as a comprehensive representation of allochothonous organic matter from diffuse sources in storm season because the turbidity concentration showed reasonable significance in a statistical correlation with the UV absorbance at 254 nm and total phosphorus. CE-QUAL-W2 simulation results showed good consistency with the observed data in terms of dissolved organic matter (DOM) including refractory dissolved organic carbon (RDOC) and labile DOC and also well explained the internal movement of constituents and stratification phenomenon in the reservoir. Instead turbidity and NOM were related well in the upper region of the reservoir according to flow distance, gradually as changing to dissolved form of organic matter, RDOM affected organic matter concentration of reservoir water quality compared to turbidity. To control the increase of soluble organic matters in the dam reservoir, appropriate dam water discharge gate operation provided effective measurement. Because of the gate operation let avoid the accumulation of organic matter within a dam reservoir by shorten of turbid regime retention time.
Detail of exciter turbine showing shaft, scroll case, servomotor and ...
Detail of exciter turbine showing shaft, scroll case, servo-motor and operating ring (left foreground) and hand wheel for butterfly valve (right background) - Morony Hydroelectric Facility, Dam and Powerhouse, Morony Dam Road, Great Falls, Cascade County, MT
Brazil's Amazonian dams: Ecological and socioeconomic impacts
NASA Astrophysics Data System (ADS)
Fearnside, P. M.
2016-12-01
Brazil's 2015-2024 Energy Expansion Plan calls for 11 hydroelectric dams with installed capacity ≥ 30 MW in the country's Amazon region. Dozens of other large dams are planned beyond this time horizon, and dams with < 30 MW installed capacity number in the hundreds. Amazonian dams have substantial environmental and socioeconomic impacts. Loss of forest to flooding is one, the Balbina and Tucuruí Dams being examples (each 3000 km2). If the Babaquara/Altamira Dam is built it will flood as much forest as both of these combined. Some planned dams imply loss of forest in protected areas, for example on the Tapajós River. Aquatic and riparian ecosystems are lost, including unique biodiversity. Endemic fish species in rapids on the Xingu and Tapajós Rivers are examples. Fish migrations are blocked, such as the commercially important "giant catfish" of the Madeira River. Dams emit greenhouse gases, including CO2 from the trees killed and CH4 from decay under anoxic conditions at the bottom of reservoirs. Emissions can exceed those from fossil-fuel generation, particularly over the 20-year period during which global emissions must be greatly reduced to meet 1.5-2°C limit agreed in Paris. Carbon credit for dams under the Climate Convention causes further net emission because the dams are not truly "additional." Anoxic environments in stratified reservoirs cause methylation of mercury present in Amazonian soils, which concentrates in fish, posing a health risk to human consumers. Population displacement is a major impact; for example, the Marabá Dam would displace 40,000 people, mostly traditional riverside dwellers (ribeirinhos). Various dams impact indigenous peoples, such as the Xingu River dams (beginning with Belo Monte) and the São Luiz do Tapajós and Chacorão Dams on the Tapajós River. Brazil has many energy options other than dams. Much energy use has little benefit for the country, such as exporting aluminum. Electric showerheads use 5% of the country's power. Losses in transmission lines (20%) are far above global averages and can be expected to increase as Amazonian hydroelectric dams far from consumer centers come on line. Brazil has tremendous wind and solar potential, but these do not have the same priority as dams. At the root of many questionable policies is a decision-making process in need of reform.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fredenberg, Wade; Carty, Daniel; Cavigli, Jon
1996-06-01
The operation of Hungry Horse Dam on the South Fork-of the Flathead River reduced the reproductive success of kokanee (Oncorhynchus nerka) spawning in the Flathead River. Montana Fish, Wildlife and Parks (MFWP) and the Confederated Salish and Kootenai Tribes (CSKT) authored a mitigation plan to offset those losses. The mitigation goal, stated in the Fisheries Mitigation Plan for Losses Attributed to the Construction and Operation of Hungry Horse Dam, is to: {open_quotes}Replace lost annual production of 100,000 kokanee adults, initially through hatchery production and pen rearing in Flathead Lake, partially replacing lost forage for lake trout (Salvelinus namaycush) in Flatheadmore » Lake.{close_quotes}« less
The U.S. Military’s Reliance on Bottled Water During Military Operations
2011-06-17
15 Tony Perry, "Afghan Dam a Monument to US Challenges," Daily Press Newspaper, (September 7...Effects on Operations. Santa Monica, CA: Arroyo Center, RAND Corporation, 2005. Peltz, Eric, Marc L Robbins , Kenneth J Girardini, Rick Eden, John M...Defense Technical Information Center, 2005. Perry, Tony . "Afghan Dam a Monument to US Challenges." Daily Press Newspaper, September 07, 2010. Rogers
Draut, Amy E.; Rubin, David M.
2008-01-01
Since the closure of Glen Canyon Dam in 1963, the natural hydrologic and sedimentary systems along the Colorado River in the Grand Canyon reach have changed substantially (see, for example, Andrews, 1986; Johnson and Carothers, 1987; Webb and others, 1999b; Rubin and others, 2002; Topping and others, 2003; Wright and others, 2005; Hazel and others, 2006b). The dam has reduced the fluvial sediment supply at the upstream boundary of Grand Canyon National Park by about 95 percent. Regulation of river discharge by dam operations has important implications for the storage and redistribution of sediment in the Colorado River corridor. In the absence of floods, sediment is not deposited at elevations that regularly received sediment before dam closure. Riparian vegetation has colonized areas at lower elevations than in predam time when annual floods removed young vegetation (Turner and Karpiscak, 1980). Together, these factors have caused a systemwide decrease in the size and number of subaerially exposed fluvial sand deposits since the 1960s, punctuated by episodic aggradation during the exceptional high-flow intervals in 1983-84, 1996, and 2004 and by sediment input from occasional tributary floods (Beus and others, 1985; Schmidt and Graf, 1987; Kearsley and others, 1994; Hazel and others, 1999; Schmidt and others, 2004; Wright and others, 2005). When the Bureau of Reclamation sponsored the creation of the Glen Canyon Environmental Studies (GCES) research initiative in 1982, research objectives included physical and biologic resources, whereas the effects of dam operations on cultural resources were not addressed (Fairley and others, 1994; Fairley, 2003). In the early 1980s, it was widely believed that because few archeologic sites were preserved within the river's annual-flood zone, cultural features would not be greatly affected by dam operations. Recent studies, however, indicate that alterations in the flow and sediment load of the Colorado River by Glen Canyon Dam operations may affect archeologic sites within the river corridor, even above the annual flood limit (Hereford and others, 1993, Yeatts, 1996, 1997; Thompson and Potochnik, 2000; Draut and others, 2005). (The annual-flood zone is defined here by the mean annual predam flood of 2,410 m3/s; the 'predam flood limit', the highest elevation at which fluvial deposits are present locally, was approximately equivalent to a rare, major flood of 8,500 m3/s; Topping and others, 2003.) Of about 500 archeologic sites documented between Glen Canyon Dam and Separation Canyon (255 river miles), more than 330 are considered to be within the area of potential effect (APE) of dam operations (Fairley and others, 1994; Neal and others, 2000; Fairley, 2005). The APE was designated by the National Park Service (NPS) to include the area below the peak stage of the 1884 flood; though previously believed to have reached 8,490 m3/s, this flood was shown by Topping and others (2003) to have peaked at 5,940 m3/s. Archeologic research and monitoring in Grand Canyon National Park focus increasingly on the potential effects of Glen Canyon Dam operations on the landscape in which these sites exist. Many archeologic sites in or on sedimentary deposits are being eroded, owing to eolian deflation and gully incision (Leap and others, 2000; Neal and others, 2000; Fairley, 2003, 2005). Hereford and others (1993) first suggested that gully incision of sedimentary deposits, and the base level to which small drainage systems respond, were linked to dam operations; they hypothesized that pronounced arroyo incision, which occurs during rainfall runoff, was caused by lowering of the effective base level at the mouths of ephemeral drainages to meet the new postdam elevation of high-flow sediment deposition, about 3 to 4 m below the lowest predam alluvial terraces. Thompson and Potochnik (2000) modified that hypothesis to include the restorative effects of fluvial deposition in the mouths of gullies and ar
Stewart, Jana S.; Lizhu Wang,; Infante, Dana M.; Lyons, John D.; Arthur Cooper,
2011-01-01
Regional assessment of cumulative impacts of dams on riverine fish assemblages provides resource managers essential information for dam operation, potential dam removal, river health assessment and overall ecosystem management. Such an assessment is challenging because characteristics of fish assemblages are not only affected by dams, but also influenced by natural variation and human-induced modification (in addition to dams) in thermal and flow regimes, physicochemical habitats and biological assemblages. This study evaluated the impacts of dams on river fish assemblages in the non-impoundment sections of rivers in the states of Michigan and Wisconsin using multiple fish assemblage indicators and multiple approaches to distinguish the influences of dams from those of other natural and human-induced factors. We found that environmental factors that influence fish assemblages in addition to dams should be incorporated when evaluating regional effects of dams on fish assemblages. Without considering such co-influential factors, the evaluation is inadequate and potentially misleading. The role of dams alone in determining fish assemblages at a regional spatial scale is relatively small (explained less than 20% of variance) compared with the other environmental factors, such as river size, flow and thermal regimes and land uses jointly. However, our results do demonstrate that downstream and upstream dams can substantially modify fish assemblages in the non-impoundment sections of rivers. After excluding river size and land-use influences, our results clearly demonstrate that dams have significant impacts on fish biotic-integrity and habitat-and-social-preference indicators. The influences of the upstream dams, downstream dams, distance to dams, and dam density differ among the fish indicators, which have different implications for maintaining river biotic integrity, protecting biodiversity and managing fisheries.
Wang, L.; Infante, D.; Lyons, J.; Stewart, J.; Cooper, A.
2011-01-01
Regional assessment of cumulative impacts of dams on riverine fish assemblages provides resource managers essential information for dam operation, potential dam removal, river health assessment and overall ecosystem management. Such an assessment is challenging because characteristics of fish assemblages are not only affected by dams, but also influenced by natural variation and human-induced modification (in addition to dams) in thermal and flow regimes, physicochemical habitats and biological assemblages. This study evaluated the impacts of dams on river fish assemblages in the non-impoundment sections of rivers in the states of Michigan and Wisconsin using multiple fish assemblage indicators and multiple approaches to distinguish the influences of dams from those of other natural and human-induced factors. We found that environmental factors that influence fish assemblages in addition to dams should be incorporated when evaluating regional effects of dams on fish assemblages. Without considering such co-influential factors, the evaluation is inadequate and potentially misleading. The role of dams alone in determining fish assemblages at a regional spatial scale is relatively small (explained less than 20% of variance) compared with the other environmental factors, such as river size, flow and thermal regimes and land uses jointly. However, our results do demonstrate that downstream and upstream dams can substantially modify fish assemblages in the non-impoundment sections of rivers. After excluding river size and land-use influences, our results clearly demonstrate that dams have significant impacts on fish biotic-integrity and habitat-and-social-preference indicators. The influences of the upstream dams, downstream dams, distance to dams, and dam density differ among the fish indicators, which have different implications for maintaining river biotic integrity, protecting biodiversity and managing fisheries. ?? 2010 John Wiley & Sons, Ltd.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Gary E.; Ploskey, Gene R.; Hedgepeth, J.
2008-07-29
Dams impact the survival of juvenile anadromous fishes by obstructing migration corridors, lowering water quality, delaying migrations, and entraining fish in turbine discharge. To reduce these impacts, structural and operational modifications to dams— such as voluntary spill discharge, turbine intake guidance screens, and surface flow outlets—are instituted. Over the last six years, we have used acoustic imaging technology to evaluate the effects of these modifications on fish behavior, passage rates, entrainment zones, and fish/flow relationships at hydroelectric projects on the Columbia River. The imaging technique has evolved from studies documenting simple movement patterns to automated tracking of images to mergingmore » and analysis with concurrent hydraulic data. This chapter chronicles this evolution and shows how the information gleaned from the scientific evaluations has been applied to improve passage conditions for juvenile salmonids. We present data from Bonneville and The Dalles dams that document fish behavior and entrainment zones at sluiceway outlets (14 to 142 m3/s), fish passage rates through a gap at a turbine intake screen, and the relationship between fish swimming effort and hydraulic conditions. Dam operators and fisheries managers have applied these data to support decisions on operational and structural changes to the dams for the benefit of anadromous fish populations in the Columbia River basin.« less
1979-07-01
General 5-1 b. Design Data 5-1 c. Experience Data 5-1 d. Visual Observation 5-1 e. Overtopping Potential 5-1 f. Dam Failure Analysis 5-2 6. STRUCTURAL...the Soil Conservation Service, Durham, New Hampshire. The construction * contractor was Robie Construction Company , Inc. i. Normal Operating...INVENTORY OF DAMS P 0O - ... - SECTION 5 HYDROLOGY AND HYDRAULIC ANALYSIS • 5.1 Evaluation of Features a. General. Baker Dam Site 11 is an earthen
1980-09-30
GEOTECHNICAL DATA 4 2.2 DESIGN RECORDS 4 2.3 CONSTRUCTION RECORDS 4 2.4 OPERATION RECORD 4 2.5 EVALUATION OF DATA 4 3 VISUAL INSPECTION 5 3.1 FINDINGS 5...g. Design and Construction History This dam was constructed in two stages as parts of Contracts E and G for Section I of the Cayuga and Seneca Canal...determine the final elevation of the footings at the time of construction to assure a proper foundation. 2.2 DESIGN RECORDS This dam was designed in
Waythomas, C.F.
2001-01-01
The formation of lahars and a debris avalanche during Holocene eruptions of the Spurr volcanic complex in south-central Alaska have led to the development of volcanic debris dams in the Chakachatna River valley. Debris dams composed of lahar and debris-avalanche deposits formed at least five times in the last 8000-10,000 years and most recently during eruptions of Crater Peak vent in 1953 and 1992. Water impounded by a large debris avalanche of early Holocene (?) age may have destabilized an upstream glacier-dammed lake causing a catastrophic flood on the Chakachatna River. A large alluvial fan just downstream of the debris-avalanche deposit is strewn with boulders and blocks and is probably the deposit generated by this flood. Application of a physically based dam-break model yields estimates of peak discharge (Qp) attained during failure of the debris-avalanche dam in the range 104 < Qp < 106 m3 s-1 for plausible breach erosion rates of 10-100 m h-1. Smaller, short-lived, lahar dams that formed during historical eruptions in 1953, and 1992, impounded smaller lakes in the upper Chakachatna River valley and peak flows attained during failure of these volcanic debris dams were in the range 103 < Qp < 104 m3 s-1 for plausible breach erosion rates. Volcanic debris dams have formed at other volcanoes in the Cook Inlet region, Aleutian arc, and Wrangell Mountains but apparently did not fail rapidly or result in large or catastrophic outflows. Steep valley topography and frequent eruptions at volcanoes in this region make for significant hazards associated with the formation and failure of volcanic debris dams. Published by Elsevier Science B.V.
Deduction of reservoir operating rules for application in global hydrological models
NASA Astrophysics Data System (ADS)
Coerver, Hubertus M.; Rutten, Martine M.; van de Giesen, Nick C.
2018-01-01
A big challenge in constructing global hydrological models is the inclusion of anthropogenic impacts on the water cycle, such as caused by dams. Dam operators make decisions based on experience and often uncertain information. In this study information generally available to dam operators, like inflow into the reservoir and storage levels, was used to derive fuzzy rules describing the way a reservoir is operated. Using an artificial neural network capable of mimicking fuzzy logic, called the ANFIS adaptive-network-based fuzzy inference system, fuzzy rules linking inflow and storage with reservoir release were determined for 11 reservoirs in central Asia, the US and Vietnam. By varying the input variables of the neural network, different configurations of fuzzy rules were created and tested. It was found that the release from relatively large reservoirs was significantly dependent on information concerning recent storage levels, while release from smaller reservoirs was more dependent on reservoir inflows. Subsequently, the derived rules were used to simulate reservoir release with an average Nash-Sutcliffe coefficient of 0.81.
Effects of flow restoration on mussel growth in a Wild and Scenic North American River
2013-01-01
Background Freshwater mussels remain among the most imperiled species in North America due primarily to habitat loss or degradation. Understanding how mussels respond to habitat changes can improve conservation efforts. Mussels deposit rings in their shell in which age and growth information can be read, and thus used to evaluate how mussels respond to changes in habitat. However, discrepancies between methodological approaches to obtain life history information from growth rings has led to considerable uncertainty regarding the life history characteristics of many mussel species. In this study we compared two processing methods, internal and external ring examination, to obtain age and growth information of two populations of mussels in the St. Croix River, MN, and evaluated how mussel growth responded to changes in the operation of a hydroelectric dam. Results External ring counts consistently underestimated internal ring counts by 4 years. Despite this difference, internal and external growth patterns were consistent. In 2000, the hydroelectric dam switched from operating on a peaking schedule to run-of-the-river/partial peaking. Growth patterns between an upstream and downstream site of the dam were similar both before and after the change in operation. At the downstream site, however, older mussels had higher growth rates after the change in operation than the same sized mussels collected before the change. Conclusions Because growth patterns between internal and external processing methods were consistent, we suggest that external processing is an effective method to obtain growth information despite providing inaccurate age information. External processing is advantageous over internal processing due to its non-destructive nature. Applying this information to analyze the influence of the operation change in the hydroelectric dam, we suggest that changing to run-of-the-river/partial peaking operation has benefited the growth of older mussels below the dam. PMID:23452382
GC51D-0831: A Study of the Impact of Dams on Sediment Retention in the Mekong River Basin
NASA Technical Reports Server (NTRS)
Munroe, Thailynn; Griffin, Robert; Anderson, Eric; Markert, Kel
2017-01-01
Dam construction in the Mekong Basin has many cascading effects on the ecology, economy, and hydrology of the surrounding region. The focus of this study is to utilize the Soil Water Assessment Tool (SWAT), developed at Texas A & M, a rainfall-runoff hydrologic model to determine change in sedimentation in the Mekong Basin after the construction of dams. This study uses land cover land use and reservoir datasets created by the NASA SERVIR-Mekong Regional Land Cover Monitoring System and Dam Inundation Mapping Tool as inputs into the model. The study also builds on the capabilities of the SWAT model by using the sediment trapping efficiency (STE) equation from Brune (1953), rewritten by Kummu & Varis (2007), to calculate STE of dams and estimate change in sediment concentration downstream. The outputs from this study can be used to inform dam operation policies, study the correlation between dams and delta subsidence, and study the impact of dams on river fisheries, which are all pressing issues in the Mekong region.
An application of extreme value theory to the management of a hydroelectric dam.
Minkah, Richard
2016-01-01
Assessing the probability of very low or high water levels is an important issue in the management of hydroelectric dams. In the case of the Akosombo dam, very low and high water levels result in load shedding of electrical power and flooding in communities downstream respectively. In this paper, we use extreme value theory to estimate the probability and return period of very low water levels that can result in load shedding or a complete shutdown of the dam's operations. In addition, we assess the probability and return period of high water levels near the height of the dam and beyond. This provides a framework for a possible extension of the dam to sustain the generation of electrical power and reduce the frequency of spillage that causes flooding in communities downstream. The results show that an extension of the dam can reduce the probability and prolong the return period of a flood. In addition, we found a negligible probability of a complete shutdown of the dam due to inadequate water level.
NASA Astrophysics Data System (ADS)
Austin, D. E.; Bulletts, K.; Bulletts, C.
2017-12-01
The traditional lands of the Southern Paiute people in the United States are bounded by more than 600 miles of the Colorado River from the Kaiparowits Plateau in the north to Blythe, California in the south. According to Southern Paiute traditional knowledge, Southern Paiutes were the first inhabitants of this region and are responsible for protecting and managing this land along with the water and all that is upon and within it. In 1963, the Bureau of Reclamation completed construction of Glen Canyon Dam on the Colorado River, and in 1972, the Glen Canyon National Recreation Area was established, encompassing Lake Mead above the Dam and a world class trout fishery on the Colorado River between the Dam and Lees Ferry. Below Lees Ferry on its way to Lake Mead and Hoover Dam, the Colorado River flows through Grand Canyon National Park and the Navajo and Hualapai reservations. U.S. federal law requires that Glen Canyon Dam be operated with minimal impact to the natural, recreational, and cultural resources of the region of the Colorado River that is potentially impacted by flows from the Dam. The Grand Canyon Protection Act and the Environmental Impact Statement (EIS) for the Operation of the Glen Canyon Dam established a program of long-term research and monitoring of the effects of the Dam on these resources. In 1991, three Southern Paiute tribes - the Kaibab Band of Paiute Indians, the Paiute Indian Tribe of Utah, and the San Juan Southern Paiute Tribe - agreed to participate in studies to identify cultural resources impacted by Glen Canyon Dam and to recommend strategies for their protection, In 1995, the EIS was completed and transition to the Adaptive Management Program (AMP) called for in the Grand Canyon Protection Act was begun. At that time, Southern Paiute activities expanded to include assessing potential environmental and cultural impacts of the dam, developing monitoring procedures, and interacting with scientists, other tribal representatives, and policymakers in the AMP. This presentation summarizes an analysis of two decades of Southern Paiute participation in the AMP, highlighting key interactions and learning experiences as well as ongoing challenges for Southern Paiute participants.
Tiffan, Kenneth F.; Kock, Tobias J.; Connor, William P.
2007-01-01
During the winter of 2005-06, we radio and PIT tagged and released 48 juvenile fall Chinook salmon to evaluate over-wintering behavior and dam passage in the lower Snake River, Washington. Fish were released at the upstream end of the Lower Granite Dam forebay in November and December 2005. Fixed radio telemetry detection sites located in forebay and tailrace areas of Lower Granite, Little Goose, Lower Monumental and Ice Harbor dams were used to monitor fish movements and dam passage through early-May 2006. Of the 48 fish released during our study, 39 (81 %) passed Lower Granite Dam and were detected at downstream detection sites, 29 (60%) passed Little Goose Dam, 25 (52%) passed Lower Monumental Dam, and 15 (31%) passed Ice Harbor Dam. Thirty-seven (95%), 23 (79%), 16 (64%), and 9 (60%) of the fish that passed Lower Granite, Little Goose, Lower Monumental, and Ice Harbor dams respectively, did so when the fish bypass system was not operated. Passage of tagged fish past lower Snake River dams generally declined during the winter, but increased again after bypass began in April. Fish residence times in reservoirs and forebays was lengthy during the winter (up to 118 d), and varied by reservoir and time of year. We observed no diel passage trends. Only 15 of the 48 fish were subsequently detected at a PIT-tag interrogation site the following spring. We believe that passage of overwintering juvenile fall Chinook salmon during winter is due more to chance than directed downstream movement. Since the primary route of passage during the winter is through powerhouse turbines, the potential exists for increased mortality for over-wintering juvenile fall Chinook salmon in the Snake River. Our findings also have implications for transportation studies of subyearling fall Chinook salmon in the Snake River. Specifically, the finding that some fish can pass undetected during the winter may bias smolt-to-adult return rate calculations that are typically used to measure the success of the aforementioned management actions.
Using causal maps to support ex-post assessment of social impacts of dams
DOE Office of Scientific and Technical Information (OSTI.GOV)
Aledo, Antonio, E-mail: Antonio.Aledo@ua.es; García-Andreu, Hugo, E-mail: Hugo.Andreu@ua.es; Pinese, José, E-mail: pinese@uel.br
- Highlights: • We defend the usefulness of causal maps (CM) for ex-post impact assessment of dams. • Political decisions are presented as unavoidable technical measures. • CM enable the identification of multiple causes involved in the dam impacts. • An alternative management of the dams is shown from the precise tracking of the causes. • Participatory CM better the quality of information and the governance of the research. This paper presents the results of an ex-post assessment of two important dams in Brazil. The study follows the principles of Social Impact Management, which offer a suitable framework for analyzingmore » the complex social transformations triggered by hydroelectric dams. In the implementation of this approach, participative causal maps were used to identify the ex-post social impacts of the Porto Primavera and Rosana dams on the community of Porto Rico, located along the High Paraná River. We found that in the operation of dams there are intermediate causes of a political nature, stemming from decisions based on values and interests not determined by neutral, exclusively technical reasons; and this insight opens up an area of action for managing the negative impacts of dams.« less
Elliott, D.G.; Pascho, R.J.; Jackson, L.M.; Mathews, G.M.; Harmon, J.R.
1997-01-01
We evaluated Renibaeterium salmoninarum infection in smolts of hatchery and wild spring-summer Chinook salmon Oncorhynchus tshawytscha sampled during most of the outmigration at Little Goose (1988) and Lower Granite dams (1988–1991) on the Snake River and at Priest Rapids and McNary dams on the Columbia River (1988–1990). We sampled 860–2,178 fish per dam each year. Homogenates of kidney–spleen tissue from all fish were tested for the presence of R. salmoninarum antigens by the enzyme-linked immunosorbent assay (ELISA), and homogenates from 10% of the fish were examined by the fluorescent antibody technique (FAT). Although only 1–11% of fish sampled at a given dam during any l year exhibited lesions characteristic of bacterial kidney disease, 86–100% of the fish tested positive for R. salmoninarum antigen by ELISA, whereas 4–17% of the fish tested positive by the FAT. During most years, a majority (68–87%) of fish testing positive by the ELISA had low R. salmoninarum antigen levels, but in 1989, 53% of positive fish from Lower Granite Dam and 52% from McNary Dam showed medium-to-high antigen levels. For most years, the highest mean antigen levels were measured in fish sampled after 75% of the total out-migrants had passed a given dam. When the largest numbers of fish were being collected for bypass or downriver transportation, mean antigen levels were relatively low.
Elliott, D.G.; Pascho, R.J.; Jackson, L.M.; Matthews, G.M.; Harmon, J.R.
1997-01-01
We evaluated Renibacterium salmoninarum infection in smolts of hatchery and wild spring-summer chinook salmon Oncorhynchus tshawytscha sampled during most of the out-migration at Little Goose (1988) and Lower Granite dams (1988-1991) on the Snake River and at Priest Rapids and McNary dams on the Columbia River (1988-1990). We sampled 860-2,178 fish per dam each year. Homogenates of kidney-spleen tissue from all fish were tested for the presence of R. salmoninarum antigens by the enzyme-linked immunosorbent assay (ELISA), and homogenates from 10% of the fish were examined by the fluorescent antibody technique (FAT). Although only 1-11% of fish sampled at a given dam during any 1 year exhibited lesions characteristic of bacterial kidney disease, 86-100% of the fish tested positive for R. salmoninarum antigen by ELISA, whereas 4-17% of the fish tested positive by the FAT. During most years, a majority (68-87%) of fish testing positive by the ELISA had low R. salmoninarum antigen levels, but in 1989, 53% of positive fish from Lower Granite Dam and 52% from McNary Dam showed medium-to-high antigen levels. For most years, the highest mean antigen levels were measured in fish sampled after 75% of the total out-migrants had passed a given dam. When the largest numbers of fish were being collected for bypass or downriver transportation, mean antigen levels were relatively low.
23 CFR 630.802 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Applicability. 630.802 Section 630.802 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PRECONSTRUCTION PROCEDURES Bridges on Federal Dams § 630.802 Applicability. A proposed bridge over a dam, together with the...
23 CFR 630.802 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Applicability. 630.802 Section 630.802 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PRECONSTRUCTION PROCEDURES Bridges on Federal Dams § 630.802 Applicability. A proposed bridge over a dam, together with the...
Beaver damming, fluvial geomorphology, and climate in Yellowstone National Park, Wyoming
NASA Astrophysics Data System (ADS)
Persico, L.; Meyer, G.
2008-12-01
Beaver habitation is an important component of many fluvial landscapes that can impact a variety of hydrologic, geomorphic, and ecologic processes. Beaver damming, via long term valley aggradation, is thought to be important to the postglacial geomorphic evolution of many smaller mountain stream networks in the western United States. Loss of beaver dams can also cause rapid channel incision. Although several studies have documented rapid short-term aggradation of channels behind single beaver dams, there is little actual data on the long-term cumulative effect of beaver damming. In Yellowstone''s Northern Range, field surveys and stratigraphic section along six streams in the Northern Range reveal net thickness of mostly <2 m and patchy distribution of Holocene beaver-pond deposits. We estimate that reaches with clear morphologic and stratigraphic evidence for beaver-related aggradation constitute about 19% of the total stream network length. Reaches with probable and possible beaver-related aggradation make up an additional 8% and 2% of the network, respectively. The remaining 71% of the network has no clear evidence for beaver-related aggradation. Thirty-nine radiocarbon ages on beaver-pond deposits in northern Yellowstone fall primarily within the last 4000 yr, but gaps in dated beaver occupation from 2200-1800 and 950-750 cal yr BP correspond with severe and persistent droughts that likely caused low to ephemeral discharges in smaller streams. In the last two decades, severe drought has also caused streams that were occupied by beaver in the 1920s to become ephemeral. Beaver have been largely absent from the Northern Range since the mid-20th century, probably due to multiple ecological and climatic factors. This loss of beaver is thought to have led to widespread degradation of stream and riparian habitat via channel incision. Although 20th-century beaver loss has caused significant channel incision at some former dam sites, downcutting elsewhere in northern Yellowstone is unrelated to beaver dams or predates historic beaver extirpation. Overall, historic incision affects a 26% of reaches that have experienced beaver related aggradation in the study area. These results highlight the importance of historical and Holocene geomorphic studies in understanding the role of beaver in landscape dynamics.
Study on Reventment-Protected and Non-Bottom-Protected Plunge Pool of High Arch Dam
NASA Astrophysics Data System (ADS)
Yingkui, Wang; Quxiu, Cao; Fanhui, Kong
2018-05-01
Lots of high arch dam have the characteristics of “High head, Large discharge and Narrow river valley”, therefore, the security researches of energy dissipation were always the focus in these hydro-projects. Statistically, the trajectory type energy dissipation is the most widely used in the built high arch dams, and the water plunge poor were always set downstream the dam body. However, the widely used protected plunge poor need large investment with the disadvantage of complicated operation and maintenance. Along with the construction of concrete high arch dam in the Southwest China, the river overburden and water cushion were deep in dam site, which is becoming a new characteristic of these hydro-projects. Accordingly, the deep water cushion can be used for the energy dissipation design, such as the “Reventment-Protected and Non-Bottom-Protected Plunge Pool”, which has the advantage of more simplified project design and more economy investment.
The Economic Benefits Of Multipurpose Reservoirs In The United States- Federal Hydropower Fleet
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hadjerioua, Boualem; Witt, Adam M.; Stewart, Kevin M.
The United States is home to over 80,000 dams, of which approximately 3% are equipped with hydroelectric generating capabilities. When a dam serves as a hydropower facility, it provides a variety of energy services that range from clean, reliable power generation to load balancing that supports grid stability. In most cases, the benefits of dams and their associated reservoirs go far beyond supporting the nation s energy demand. As evidenced by the substantial presence of non-powered dams with the ability to store water in large capacities, the primary purpose of a dam may not be hydropower, but rather one ofmore » many other purposes. A dam and reservoir may support navigation, recreation, flood control, irrigation, and water supply, with each multipurpose benefit providing significant social and economic impacts on a local, regional, and national level. When hydropower is one of the services provided by a multipurpose reservoir, it is then part of an integrated system of competing uses. Operating rules, management practices, consumer demands, and environmental constraints must all be balanced to meet the multipurpose project s objectives. When federal dams are built, they are authorized by Congress to serve one or more functions. Legislation such as the Water Resources Development Act regulates the operation of the facility in order to coordinate the authorized uses and ensure the dam s intended objectives are being met. While multipurpose reservoirs account for billions of dollars in contributions to National Economic Development (NED) every year, no attempt has been made to evaluate their benefits on a national scale. This study is an on-going work conducted by Oak Ridge National Laboratory in an effort to estimate the economic benefits of multipurpose hydropower reservoirs in the United States. Given the important role that federal hydropower plays in the U.S., the first focus of this research will target the three main federal hydropower owners Tennessee Valley Authority, U.S. Army Corps of Engineers, and U.S. Bureau of Reclamation. Together these three agencies own and operate 157 powered dams which account for almost half of the total installed hydropower capacity in the U.S. Future work will include engaging publicly-owned utilities and the private sector in order to quantify the benefits of all multipurpose hydropower reservoirs in the U.S.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fry, M.A.; Needham, C.E.; Stucker, M.
1976-10-01
This laboratory performed Hydrodynamics Unlimited (HULL) calculations of the air blast over a dam for two yields and two pressure regions. A 5th calculation included a rigid blockhouse at the foot of the dam. Although the shielding effect of the dam reduced the incident blast wave overpressure, reflection of the shock from the valley floor raised the peak overpressure up to at least 40% of the free air value. In almost every case, the overpressure impulses near the foot of the dam were greater than or equal to free air values. The rigid blockhouse experienced the most severe overpressure environments.more » The assumption of a 50-psi hard blockhouse is reasonable. During collapse of the blockhouse, it appears to be rigid to the air flow, since it responds slowly to the rapid air blast. Although there may be other reasons to detonate the weapon on the surface of the reservoir, the best way to destroy the blockhouse and any related structures with air blast, probably would be to detonate the device downstream of the blockhouse.« less
Conrads, Paul; Feaster, Toby D.; Harrelson, Larry G.
2008-01-01
The Congaree National Park was established '... to preserve and protect for the education, inspiration, and enjoyment of present and future generations an outstanding example of a near-virgin, southern hardwood forest situated in the Congaree River flood plain in Richland County, South Carolina' (Public Law 94-545). The resource managers at Congaree National Park are concerned about the timing, frequency, magnitude, and duration of flood-plain inundation of the Congaree River. The dynamics of the Congaree River directly affect ground-water levels in the flood plain, and the delivery of sediments and nutrients is constrained by the duration, extent, and frequency of flooding from the Congaree River. The Congaree River is the southern boundary of the Congaree National Park and is formed by the convergence of the Saluda and Broad Rivers 24 river miles upstream from the park. The streamflow of the Saluda River has been regulated since 1929 by the operation of the Saluda Dam at Lake Murray. The U.S. Geological Survey, in cooperation with the National Park Service, Congaree National Park, studied the interaction between surface water in the Congaree River and ground water in the flood plain to determine the effect Saluda Dam operations have on water levels in the Congaree National Park flood plain. Analysis of peak flows showed the reduction in peak flows after the construction of Lake Murray was more a result of climate variability and the absence of large floods after 1930 than the operation of the Lake Murray dam. Dam operations reduced the recurrence interval of the 2-year to 100-year peak flows by 6.1 to 17.6 percent, respectively. Analysis of the daily gage height of the Congaree River showed that the dam has had the effect of lowering high gage heights (95th percentile) in the first half of the year (December to May) and raising low gage heights (5th percentile) in the second half of the year (June to November). The dam has also had the effect of increasing the 1-, 3-, 7-, 30-, and 90-day minimum gage heights by as much as 23.9 percent and decreasing the 1-, 3-, 7-, 30-, and 90-day maximum gage heights by as much as 7.2 percent. Analysis of the ground-water elevations in the Congaree National Park flood plain shows similar results as the gage-height analysis--the dam has had the effect of lowering high ground-water elevations and increasing low ground-water elevations. Overall, the operation of the dam has had a greater effect on the gage heights within the river banks than gage heights in the flood plain. This result may have a greater effect on the subsurface water levels of the surficial flood-plain aquifer than the frequency and magnitude of inundation of the flood plain.
Research on early-warning index of the spatial temperature field in concrete dams.
Yang, Guang; Gu, Chongshi; Bao, Tengfei; Cui, Zhenming; Kan, Kan
2016-01-01
Warning indicators of the dam body's temperature are required for the real-time monitoring of the service conditions of concrete dams to ensure safety and normal operations. Warnings theories are traditionally targeted at a single point which have limitations, and the scientific warning theories on global behavior of the temperature field are non-existent. In this paper, first, in 3D space, the behavior of temperature field has regional dissimilarity. Through the Ward spatial clustering method, the temperature field was divided into regions. Second, the degree of order and degree of disorder of the temperature monitoring points were defined by the probability method. Third, the weight values of monitoring points of each regions were explored via projection pursuit. Forth, a temperature entropy expression that can describe degree of order of the spatial temperature field in concrete dams was established. Fifth, the early-warning index of temperature entropy was set up according to the calculated sequential value of temperature entropy. Finally, project cases verified the feasibility of the proposed theories. The early-warning index of temperature entropy is conducive to the improvement of early-warning ability and safety management levels during the operation of high concrete dams.
2011-07-01
gate operations at Belleville Locks and Dam. ........................... 105 Figure 5.20 The non-linear costs for full closure of the locks and dam...Super Cone Fender Front Arch Results ................................................. 96 Table 5.3 Costs Over Time for Full Closure at Particular Corps...Corps Navigation Economics PDT tabulation of costs over time for full closure at the Corps lock and dam structures. Bob Willis also supplied the
Mitigation for the Construction and Operation of Libby Dam, 2004-2005 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunnigan, James; DeShazer, Jay; Garrow, Larry
2005-06-01
''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine themore » biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana Fish, Wildlife & Parks (MFWP) uses a combination of techniques to collect physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered and threatened species, and the assessment of restoration or management activities designed to restore native fishes and their habitats.« less
Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunnigan, James; DeShazer, Jay; Garrow, Larry
2004-06-01
''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determinemore » the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.« less
Reconciling water harvesting and soil erosion control by thoughtful implementation of SWC measures
NASA Astrophysics Data System (ADS)
Bellin, N.; Vanacker, V.; van Wesemael, B.
2012-04-01
Soil and water conservation (SWC) structures are largely present in Southeast Spain. Traditionally, SWC structures such as step terraces and earthen check dams were implemented in agricultural fields. They are usually found in semi-arid traditional rainfed agricultural systems that heavily rely on SWC structures to supplement the sparse rainfall. The on-site SWC measures favor water infiltration and reduce water runoff and soil erosion. In the river system (off site), large concrete/gabion check dams have been constructed since the 70's. The analysis of orthophotographs and field survey observations indicate a severe decay of on-site SWC structures in the agricultural area. This has been observed for the Cárcavo catchment (Murcia). The density of step terraces and check dams decreased by 25% between 1956 and 2005. Changes in the agricultural area can be summarized as: (i) rapid expansion of rainfed crops in marginal areas and (ii) mechanization of agriculture associated with frequent tillage operations. It became evident that the high density of SWC structures has now become a nuisance in rainfed orchards that are maintained by regular shallow tillage. We constrained the effects of SWC structures on hydrological connectivity by assessing their functioning during a heavy storm (return period 8.2 yrs in 2006). The percentage of cropland draining directly on the river system without interference of a check dam has increased from 9% in 1956 to 31% in 2005 and 40 % after the storm in November 2006. While there is a strong decrease of traditional SWC structures, several hundred large check dams have been constructed during the last decades in ephemeral streams (Almeria). 36 of them have been investigated in selected Sierras. The volume of sediment retained was found low (mean: 1.4 t ha-1 yr-1). 67% of the variability has been explained by topographical, land use and agricultural activities. After a field survey in 2009, a large majority of check dams located in non-agricultural catchments have been found only partially filled with sediments. Extensive reforestation programs, recovery of natural vegetation (dense matorral) and abandonment of agricultural fields in the Sierras led to a strong reduction of the sediment transport towards the river system. Although the effect of the check dams on the transport of sediment has not been important, the check dams have played a major role in flood control in the area. Our data indicate that thoughtful design of SWC schemes is necessary to reconcile water harvesting, erosion mitigation and flood control. Currently, the erosion hotspots are clearly localized in the agricultural fields, and not in the marginal lands in the Sierras. The combination of on-site and off-site SWC measures in the agricultural areas is highly efficient to reduce fluxes of sediment and surface water.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Colotelo, Alison HA; Harnish, Ryan A.; Jones, Bryan W.
Steelhead (Oncorhynchus mykiss) populations have declined throughout their range in the last century and many populations, including those of the Snake River Basin are listed under the Endangered Species Act of 1973. The reasons for their decline are many and complex, but include habitat loss and degradation, overharvesting, and dam construction. The 2008 Biological Opinion calls for an increase in the abundance of female steelhead through an increase in iteroparity (i.e., repeat spawning) and this can be realized through a combination of reconditioning and in-river survival of migrating kelts. The goal of this study is to provide the data necessarymore » to inform fisheries managers and dam operators of Snake River kelt migration patterns, survival, and routes of dam passage. Steelhead kelts (n = 487) were captured and implanted with acoustic transmitters and passive integrated transponder (PIT)-tags at the Lower Granite Dam (LGR) Juvenile Fish Facility and at weirs located in tributaries of the Snake and Clearwater rivers upstream of LGR. Kelts were monitored as they moved downstream through the Federal Columbia River Power System (FCRPS) by 15 autonomous and 3 cabled acoustic receiver arrays. Cabled receiver arrays deployed on the dam faces allowed for three-dimensional tracking of fish as they approached the dam face and were used to determine the route of dam passage. Overall, 27.3% of the kelts tagged in this study successfully migrated to Martin Bluff (rkm 126, as measured from the mouth of the Columbia River), which is located downstream of all FCRPS dams. Within individual river reaches, survival per kilometer estimates ranged from 0.958 to 0.999; the lowest estimates were observed in the immediate forebay of FCRPS dams. Steelhead kelts tagged in this study passed over the spillway routes (spillway weirs, traditional spill bays) in greater proportions and survived at higher rates compared to the few fish passed through powerhouse routes (turbines and juvenile bypass systems). The results of this study provide information about the route of passage and subsequent survival of steelhead kelts that migrated through the Snake and Columbia rivers from LGR to Bonneville Dam in 2013. These data may be used by fisheries managers and dam operators to identify potential ways to increase the survival of kelts during their seaward migrations.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Colotelo, Alison H.A.; Harnish, Ryan A.; Jones, Bryan W.
2014-12-15
Steelhead (Oncorhynchus mykiss) populations have declined throughout their range in the last century and many populations, including those of the Snake River Basin are listed under the Endangered Species Act of 1973. The reasons for their decline are many and complex, but include habitat loss and degradation, overharvesting, and dam construction. The 2008 Biological Opinion calls for an increase in the abundance of female steelhead through an increase in iteroparity (i.e., repeat spawning) and this can be realized through a combination of reconditioning and in-river survival of migrating kelts. The goal of this study is to provide the data necessarymore » to inform fisheries managers and dam operators of Snake River kelt migration patterns, survival, and routes of dam passage. Steelhead kelts (n = 487) were captured and implanted with acoustic transmitters and passive integrated transponder (PIT)-tags at the Lower Granite Dam (LGR) Juvenile Fish Facility and at weirs located in tributaries of the Snake and Clearwater rivers upstream of LGR. Kelts were monitored as they moved downstream through the Federal Columbia River Power System (FCRPS) by 15 autonomous and 3 cabled acoustic receiver arrays. Cabled receiver arrays deployed on the dam faces allowed for three-dimensional tracking of fish as they approached the dam face and were used to determine the route of dam passage. Overall, 27.3% of the kelts tagged in this study successfully migrated to Martin Bluff (rkm 126, as measured from the mouth of the Columbia River), which is located downstream of all FCRPS dams. Within individual river reaches, survival per kilometer estimates ranged from 0.958 to 0.999; the lowest estimates were observed in the immediate forebay of FCRPS dams. Steelhead kelts tagged in this study passed over the spillway routes (spillway weirs, traditional spill bays) in greater proportions and survived at higher rates compared to the few fish passed through powerhouse routes (turbines and juvenile bypass systems). The results of this study provide information about the route of passage and subsequent survival of steelhead kelts that migrated through the Snake and Columbia rivers from LGR to Bonneville Dam in 2013. These data may be used by fisheries managers and dam operators to identify potential ways to increase the survival of kelts during their seaward migrations.« less
NASA Astrophysics Data System (ADS)
Shibuo, Yoshihiro; Ikoma, Eiji; Lawford, Peter; Oyanagi, Misa; Kanauchi, Shizu; Koudelova, Petra; Kitsuregawa, Masaru; Koike, Toshio
2014-05-01
While availability of hydrological- and hydrometeorological data shows growing tendency and advanced modeling techniques are emerging, such newly available data and advanced models may not always be applied in the field of decision-making. In this study we present an integrated system of ensemble streamflow forecast (ESP) and virtual dam simulator, which is designed to support river and dam manager's decision making. The system consists of three main functions: real time hydrological model, ESP model, and dam simulator model. In the real time model, the system simulates current condition of river basins, such as soil moisture and river discharges, using LSM coupled distributed hydrological model. The ESP model takes initial condition from the real time model's output and generates ESP, based on numerical weather prediction. The dam simulator model provides virtual dam operation and users can experience impact of dam control on remaining reservoir volume and downstream flood under the anticipated flood forecast. Thus the river and dam managers shall be able to evaluate benefit of priori dam release and flood risk reduction at the same time, on real time basis. Furthermore the system has been developed under the concept of data and models integration, and it is coupled with Data Integration and Analysis System (DIAS) - a Japanese national project for integrating and analyzing massive amount of observational and model data. Therefore it has advantage in direct use of miscellaneous data from point/radar-derived observation, numerical weather prediction output, to satellite imagery stored in data archive. Output of the system is accessible over the web interface, making information available with relative ease, e.g. from ordinary PC to mobile devices. We have been applying the system to the Upper Tone region, located northwest from Tokyo metropolitan area, and we show application example of the system in recent flood events caused by typhoons.
Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam Sluiceway, 2005
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Gary E.; Khan, Fenton; Hedgepeth, J
2006-06-01
The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate fish passage at The Dalles Dam powerhouse in 2005. The goal of the study was to provide information on smolt passage that will inform decisions on long-term measures and operations to enhance sluiceway passage and reduce turbine passage to improve smolt survival at the dam. The study addressed one of the main programs dedicated to improving juvenile salmonid survival at The Dalles Dam: Surface Flow Bypass. The study objectives (see below) were met using a combination of hydroacoustic and hydraulic data. The study incorporatedmore » fixed-location hydroacoustic methods across the entire powerhouse, with especially intense sampling using multiple split-beam transducers at all sluiceway portals. We did not sample fish passage at the spillway in 2005. In the sluiceway nearfield, we used an acoustic camera to track fish movements. The fish data were interpreted with hydraulic data from a computational fluid dynamics (CFD) model. Fish passage data were collected in the framework of an “experiment” using a randomized block design (3-day treatments; two treatments) to compare two sluiceway operational configurations: Sluice 2+5 and Sluice 2+19 (six gates open for each configuration). Total project outflow was 76% of the 10-year average for spring and 71% of the 10-year average for summer. Based on these findings, we make the following recommendations: 1) The sluice should be operated 24 h/d from April until November. 2) Open six rather than three sluice gates to take advantage of the maximum hydraulic capacity of the sluiceway. 3) Open the three gates above the western-most operating main turbine unit and the three gates at MU 8 where turbine passage rates are relatively high. 4) Operate the turbine units below open sluice gates as a standard fish operations procedure. 5) Develop hydraulic and entrance enhancements to the sluiceway to tap the potential of The Dalles Dam sluiceway to be highly efficient and effective at passing juvenile salmonids. 6) Consider the following elements for surface flow bypasses during design of any sluiceway enhancements at The Dalles Dam: Form an extensive surface flow bypass flow net (surface bypass discharge greater than ~7% of total project discharge) at both west and east ends of the dam; Create a gradual increase in water velocity approaching the surface flow bypass (ideally, acceleration < 1 m/s per meter); Make water velocities at an entrance high enough (> 3 m/s) to entrain the subject juvenile fishes, e.g., 10,000 cfs or so; Adapt the shape and orientation of the surface entrance(s) to fit site-specific features, i.e., test a Removable Sluiceway Weir. 7)The Dalles Dam sluiceway has potential to be highly efficient and effective at passing juvenile salmonids. We recommend tapping this potential with enhancements to the sluiceway.« less
Project Planning for Cougar Dam during 2010
Haskell, Craig A.; Tiffan, Kenneth F.
2011-01-01
Cougar Dam is a 158 m-tall, rock fill dam located about 63 km east of Springfield, Oregon. Completed in 1963, the dam is owned and operated by the U.S. Army Corps of Engineers (USACE). It impounds Cougar Reservoir, which is 9.7 km long, has a surface area of 518 ha, and is predominately used for flood control. The pool elevation typically ranges from a maximum conservation pool of 515 m (1,690 ft) National Geodetic Vertical Datum (NGVD) in summer to a minimum flood control elevation of 467 m (1,532 ft NGVD) in winter. The reservoir thermally stratifies in the summer, has an average depth of 37 m, and holds 153,500 acre-feet when full. Cougar Dam is located on the South Fork of the McKenzie River 7 km upstream from the mainstem McKenzie River, a tributary of the Willamette River. The McKenzie River Basin basin supports the largest remaining population of wild spawning spring Chinook salmon in the Willamette River Basin (National Oceanic and Atmospheric Administration; NOAA, 2008). Cougar Dam and others were collectively deemed to cause jeopardy to the sustainability of anadromous fish stocks in the Willamette River Basin (NOAA, 2008). Prior to dam construction, as many as 805 redds were observed in the South Fork of the McKenzie River (Willis and others, 1960) and it is estimated that 40 km of spawning habitat were lost when access was blocked after dam construction. The 2008 Willamette Biological Opinion (BIOP) requires improvements to operations and structures to reduce impacts on Upper Willamette River (UWR) Chinook salmon (Oncorhynchus tshawytscha) and UWR steelhead (O. mykiss; NOAA, 2008). In 2010, an adult fish collection facility was completed below Cougar Dam to collect returning adult salmon for transport to spawning habitats above the dam. Before that time, returning adult spring Chinook salmon were transported to upstream spawning areas as part of a trap-and-haul program with adults passed ranging annually from 0 to 1,038 (Taylor, 2000). The progeny of adult fish that are allowed to spawn above Cougar Dam move downstream into Cougar Reservoir in the spring. Under the BIOP, the USACE is required to provide downstream fish passage or operational alternatives at Cougar Dam by 2014. Currently, there is little information about the seasonal timing of reservoir entry of juvenile Chinook salmon and what habitats they and other fishes use in the reservoir. However, rotary screw traps placed in the outlet channel below the dam indicate peak juvenile passage coinciding with seasonally low pool elevation in mid December and late January. It is unknown whether juveniles upstream of Cougar Dam can be captured in large enough numbers for tagging and subsequent survival studies to proceed. These studies are needed to examine the feasibility of installing downstream fish passage structures at Cougar Dam to meet BIOP requirements. Therefore, the USACE contracted with the U.S. Geological Survey (USGS) to test the efficacy of using a mid-water trawl and lampara seine to capture fish in Cougar Reservoir on three consecutive days in the fall of 2010. These collection methods could potentially provide fish for feasibility and subsequent survival studies and as verification of fish targets in future active hydroacoustic surveys.
Rubber dam use less stressful for children and dentists.
Innes, Nicola
2012-06-01
Randomised controlled trial, single centre and operator. 72 patients (6-16 years) assessed as compliant, with no allergies, not on significant medication were divided into two groups by 'drawing sealed lots'. 234 fully erupted teeth were sealed. Molars and/or premolars were sealed dependant on age. Teeth were pre-cleaned with prophy paste. In the controls, teeth were isolated with buccal and lingual cotton rolls and salivary ejector in the intervention group a rubber dam was used. The same etching, rinsing and placement protocol was used in both arms. Outcomes were: patients' subjective measures of pain using a visual analogue scale; blood pressure (before and after treatment), breath rate, pulse rate and skin resistance at five time points. The operator's pulse rate was measured and they completed a questionnaire on subjective mental and physical stress following treatment. Treatment times were recorded. The breath rate was significantly (P < 0.05) lower and the skin resistance level was significantly higher during treatment with rubber dam compared to the control group. Subjective pain perception was significantly lower for the test group. The treatment time needed for the fissure sealing procedure was 12.4% less in the test group. The authors state; '... in the hands of an experienced dentist, isolation with rubber dam is less stressful for children and adolescents than isolation with cotton rolls, and can save valuable treatment time.' The operator's stress measures were lower with rubber dam and treatment time was reduced.
Quantifying Factors That Impact Riverbed Dynamic Permeability at a Riverbank Filtration Facility
NASA Astrophysics Data System (ADS)
Ulrich, C.; Hubbard, S. S.; Florsheim, J. L.; Rosenberry, D. O.; Borglin, S. E.; Zhang, Y.; Seymour, D.; Trotta, M.
2012-12-01
Previous modeling studies of the Wohler riverbank filtration system on the Russian River, California suggested that riverbed and aquifer permeability both influence the development of a pumping-induced unsaturated zone below the riverbed, which affects water produced through large radial water-supply collector wells that extend beneath and adjacent to the river. In particular, previous work suggests that riverbed permeability is influenced by interaction between pumping and river stage that is controlled by a downstream temporary inflatable dam during the summer low flow period. We hypothesize that raising the dam may instead lead to deposition of fine-grained sediment and/or accumulation of biota, both of which decrease riverbed permeability in the vicinity of the collector wells. To test this hypothesis, we are monitoring streambed permeability and seepage as a function of river stage and dam operation. We are using multiple methods to monitor the hydrological, sedimentological and geomorphic dynamics, including: seepage meters, sediment traps, cryogenic coring, ground penetrating radar, electrical resistance tomography, riverbed topography, piezometers, and thermistors. Here we discuss the use of this novel suite of methods to quantify dynamic riverbed permeability, how it relates to dam operation, and determine the key controls on permeability (i.e., biotic or abiotic). These results are expected to improve the overall understanding of riverbed permeability dynamics associated with Riverbank filtration. The results are also expected to be transferable to the project sponsors, the Sonoma County Water Agency, toward the development of an optimal pumping and dam operation schedule.
Davis, Robert P; Sullivan, S Mažeika P; Stefanik, Kay C
2017-12-01
Recent increases in dam removals have prompted research on ecological and geomorphic river responses, yet contaminant dynamics following dam removals are poorly understood. We investigated changes in sediment concentrations and fish-community body burdens of mercury (Hg), selenium (Se), polychlorinated biphenyls (PCB), and chlorinated pesticides before and after two lowhead dam removals in the Scioto and Olentangy Rivers (Columbus, Ohio). These changes were then related to documented shifts in fish food-web structure. Seven study reaches were surveyed from 2011 to 2015, including controls, upstream and downstream of the previous dams, and upstream restored vs. unrestored. For most contaminants, fish-community body burdens declined following dam removal and converged across study reaches by the last year of the study in both rivers. Aldrin and dieldrin body burdens in the Olentangy River declined more rapidly in the upstream-restored vs. the upstream-unrestored reach, but were indistinguishable by year three post dam removal. No upstream-downstream differences were observed in body burdens in the Olentangy River, but aldrin and dieldrin body burdens were 138 and 148% higher, respectively, in downstream reaches than in upstream reaches of the Scioto River following dam removal. The strongest relationships between trophic position and body burdens were observed with PCBs and Se in the Scioto River, and with dieldrin in the Olentangy River. Food-chain length - a key measure of trophic structure - was only weakly related to aldrin body burdens, and unrelated to other contaminants. Overall, we demonstrate that lowhead dam removal may effectively reduce ecosystem contamination, largely via shifts in fish food-web dynamics versus sediment contaminant concentrations. This study presents some of the first findings documenting ecosystem contamination following dam removal and will be useful in informing future dam removals. Copyright © 2017 Elsevier Ltd. All rights reserved.
Geophysical Investigations at Hidden Dam, Raymond, California Flow Simulations
Minsley, Burke J.; Ikard, Scott
2010-01-01
Numerical flow modeling and analysis of observation-well data at Hidden Dam are carried out to supplement recent geophysical field investigations at the site (Minsley and others, 2010). This work also is complementary to earlier seepage-related studies at Hidden Dam documented by Cedergren (1980a, b). Known seepage areas on the northwest right abutment area of the downstream side of the dam was documented by Cedergren (1980a, b). Subsequent to the 1980 seepage study, a drainage blanket with a sub-drain system was installed to mitigate downstream seepage. Flow net analysis provided by Cedergren (1980a, b) suggests that the primary seepage mechanism involves flow through the dam foundation due to normal reservoir pool elevations, which results in upflow that intersects the ground surface in several areas on the downstream side of the dam. In addition to the reservoir pool elevations and downstream surface topography, flow is also controlled by the existing foundation geology as well as the presence or absence of a horizontal drain in the downstream portion of the dam. The current modeling study is aimed at quantifying how variability in dam and foundation hydrologic properties influences seepage as a function of reservoir stage. Flow modeling is implemented using the COMSOL Multiphysics software package, which solves the partially saturated flow equations in a two-dimensional (2D) cross-section of Hidden Dam that also incorporates true downstream topography. Use of the COMSOL software package provides a more quantitative approach than the flow net analysis by Cedergren (1980a, b), and allows for rapid evaluation of the influence of various parameters such as reservoir level, dam structure and geometry, and hydrogeologic properties of the dam and foundation materials. Historical observation-well data are used to help validate the flow simulations by comparing observed and predicted water levels for a range of reservoir elevations. The flow models are guided by, and discussed in the context of, the geophysical work (Minsley and others, 2010) where appropriate.
NASA Astrophysics Data System (ADS)
Kameyama, S.; Nohara, S.; Sato, T.; Fujii, Y.; Kudo, K.
2009-12-01
The Mekong River watershed is undergoing rapid economic progress and population growth, raising conflicts between watershed development and environmental conservation. A typical conflict is between the benefits of dam construction versus the benefits of watershed ecological services. In developed countries, this conflict is changing to a coordinated search for outcomes that are mutually acceptable to all stakeholders. In the Mekong River, however, government policy gives priority to watershed development for ensuring steady energy supplies. Since the 1990s, a series of dams called “the Mekong Cascade” have been under construction. Dam construction has multiple economic values as electric power supply, irrigation water, flood control, etc. On the other hand, the artificial flow discharge controls of dam moderate seasonal hydrologic patterns of the Asian monsoon region. Dam operations can change the sediment transport regime and river structure. Furthermore, their impacts on watershed ecosystems and traditional economic activities of fisheries and agriculture in downstream areas may be severe. We focus on dam impacts on spatio-temporal patterns of sediment transport and seasonal flood in riparian areas downstream from Mekong River dams. Our study river section is located on 100 km down stream from the Golden Triangle region of Myanmar, Laos, and Thailand. We selected a 10-km section in this main channel to simulate seasonal flooding. We modeled the river hydrology in the years 1991 and 2002, before and after the Manwan dam construction (1986-1993). For this simulation, we adapted three models (distributed runoff model, 1-D hydrological model, and 2-D flood simulation with sediment movement algorithm.) Input data on river structure, water velocity, and flow volume were acquired from field survey data in November 2007 and 2008. In the step of parameter decision, we adopted the shuffled complex evolution method. To validate hydrologic parameters, we used annual water level data observed in Chiang Sean and Luang Prabang. To calculate sediment flux volume, we employed a Load-Quantity equation using total suspended solids data from monthly water sampling and flow discharge volumes over 13 months. To evaluate the impact of dam construction and watershed development, we inputted the same year of precipitation data using two watershed conditions with different parameters. Our results from the 1-D model displayed a seasonal delay of water flooding time after summer rainy season and an increase in sediment transport volume from September to October. In the flood simulation by the 2-D model, most of the annual sediment transport was concentrated from July to October. The spatial pattern of sediment dynamics was dependent largely on river structure including river meander shape, river bottom elevation, and geometry of the riparian zone. Our study approaches and simulation results show promise for beginning a quantitative assessment approach to cross-boundary environmental issues in the Mekong River watershed.
[A retaining dam against reflux. Laparoscopic fundoplication helps even in stubborn cases].
Waninger, J; Rückauer, K
2000-04-27
The introduction of proton pump inhibitors (PPI) and laparoscopic fundoplication in the treatment of gastroesophageal reflux disease offered an opportunity for definitive healing. The indication for surgery is the failure of medical treatment, recurrence of symptoms following conservative treatment, severe side effects of the medication, and the patient's wish to stop taking drugs. The laparoscopic treatment has a low rate of complications. Apart from temporary dysphagia (30%), rapid satiety, increased flatulence and suppressed eructation are possible undesirable sequelae. Intra-operative bleeding and organ perforation (1%) are major feared occurrences. The rate of conversion to open surgery is 5.8%, and the mortality rate is 0.1%. Persistent dysphagia in 3.4% may be caused by a slipped cuff. A revision procedure is necessary in 0.7% of the patients. Patient satisfaction with the results of the operation ranges between 87 and 100%.
An R package for the design, analysis and operation of reservoir systems
NASA Astrophysics Data System (ADS)
Turner, Sean; Ng, Jia Yi; Galelli, Stefano
2016-04-01
We present a new R package - named "reservoir" - which has been designed for rapid and easy routing of runoff through storage. The package comprises well-established tools for capacity design (e.g., the sequent peak algorithm), performance analysis (storage-yield-reliability and reliability-resilience-vulnerability analysis) and release policy optimization (Stochastic Dynamic Programming). Operating rules can be optimized for water supply, flood control and amenity objectives, as well as for maximum hydropower production. Storage-depth-area relationships are in-built, allowing users to incorporate evaporation from the reservoir surface. We demonstrate the capabilities of the software for global studies using thousands of reservoirs from the Global Reservoir and Dam (GRanD) database fed by historical monthly inflow time series from a 0.5 degree gridded global runoff dataset. The package is freely available through the Comprehensive R Archive Network (CRAN).
43 CFR 418.15 - Operations monitoring.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Wadsworth—U.S. Geological Survey (USGS) gauge number 10351300; (ii) Carson River below Lahontan Dam—USGS gauge number 10312150; (iii) Rock Dam Ditch near the end of the concrete lining; and (2) Subtracting: (i... Tarzyn Road near Fallon (below Sagouspe Dam) for satisfying water rights outside of the Project...
43 CFR 418.15 - Operations monitoring.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Wadsworth—U.S. Geological Survey (USGS) gauge number 10351300; (ii) Carson River below Lahontan Dam—USGS gauge number 10312150; (iii) Rock Dam Ditch near the end of the concrete lining; and (2) Subtracting: (i... Tarzyn Road near Fallon (below Sagouspe Dam) for satisfying water rights outside of the Project...
33 CFR 263.23 - Small flood control project authority (Section 205).
Code of Federal Regulations, 2010 CFR
2010-07-01
... operation, except as may result from the normal procedure applying to projects authorized after submission of preliminary examination and survey reports. (b) Non-Federal responsibilities for dam and reservoir project. All new projects under this authority, including dams and reservoirs, are considered local...
33 CFR 263.23 - Small flood control project authority (Section 205).
Code of Federal Regulations, 2011 CFR
2011-07-01
... operation, except as may result from the normal procedure applying to projects authorized after submission of preliminary examination and survey reports. (b) Non-Federal responsibilities for dam and reservoir project. All new projects under this authority, including dams and reservoirs, are considered local...
Predicting the thermal effects of dam removal on the Klamath River
Bartholow, J.M.; Campbell, S.G.; Flug, M.
2004-01-01
The Klamath River once supported large runs of anadromous salmonids. Water temperature associated with multiple mainstem hydropower facilities might be one of many factors responsible for depressing Klamath salmon stocks. We combined a water quantity model and a water quality model to predict how removing the series of dams below Upper Klamath Lake might affect water temperatures, and ultimately fish survival, in the spawning and rearing portions of the mainstem Klamath. We calibrated the water quantity and quality models and applied them for the hydrometeorological conditions during a 40-year postdam period. Then, we hypothetically removed the dams and their impoundments from the models and reestimated the river’s water temperatures. The principal thermal effect of dam and reservoir removal would be to restore the timing (phase) of the river’s seasonal thermal signature by shifting it approximately 18 days earlier in the year, resulting in river temperatures that more rapidly track ambient air temperatures. Such a shift would likely cool thermal habitat conditions for adult fall chinook (Oncorhynchus tshawytscha) during upstream migration and benefit mainstem spawning. By contrast, spring and early summer temperatures could be warmer without dams, potentially harming chinook rearing and outmigration in the mainstem. Dam removal might affect the river’s thermal regime during certain conditions for over 200 km of the mainstem.
Dalrymple, G.B.; Lockwood, J.P.
1990-01-01
The waters of Lake Nyos are impounded by a fragile natural dam composed of pyroclastic rocks ejected during the formation of the lake crater (maar). Lateral erosion of this dam has reduced its width from over 500 m to only 45 m. Published whole-rock K-Ar ages of about 100 ka on juvenile basalt from the dam suggests that erosion has been slow and that the dam poses no imminent threat. New apparent 40Ar/39Ar ages of 1.4 to 232 Ma on xenocrystic K-feldspar contained in the basalt show that the xenocrysts, whose source is the 528-Ma crystalline basement, are carriers of inherited radiogenic 40Ar and would cause the whole-rock K-Ar ages to be too old. The best estimate for the age of the maar is provided by a 14C age of 400 ?? 100 yr BP on charcoal from the base of the dam. This young age indicates that the dam is eroding at a relatively rapid rate; its failure, perhaps within a few decades, would result in a major flood and imperil thousands of people living downstream in Cameroon and eastern Nigeria. ?? 1990 Kluwer Academic Publishers.
Dudgeon, D
2011-12-01
This review compares and contrasts the environmental changes that have influenced, or will influence, fishes and fisheries in the Yangtze and Mekong Rivers. These two rivers have been chosen because they differ markedly in the type and intensity of prevailing threats. The Mekong is relatively pristine, whereas the Three Gorges Dam on the Yangtze is the world's largest dam representing the apotheosis of environmental alteration of Asian rivers thus far. Moreover, it is situated at the foot of a planned cascade of at least 12 new dams on the upper Yangtze. Anthropogenic effects of dams and pollution of Yangtze fishes will be exacerbated by plans to divert water northwards along three transfer routes, in part to supplement the flow of the Yellow River. Adaptation to climate change will undoubtedly stimulate more dam construction and flow regulation, potentially causing perfect storm conditions for fishes in the Yangtze. China has already built dams along the upper course of the Mekong, and there are plans for as many as 11 mainstream dams in People's Democratic Republic (Laos) and Cambodia in the lower Mekong Basin. If built, they could have profound consequences for biodiversity, fisheries and human livelihoods, and such concerns have stalled dam construction. Potential effects of dams proposed for other rivers (such as Nujiang-Salween) are also cause for concern. Conservation or restoration measures to sustain some semblance of the rich fish biodiversity of Asian rivers can be identified, but their implementation may prove problematic in a context of increasing Anthropocene alteration of these ecosystems. © 2011 The Author. Journal of Fish Biology © 2011 The Fisheries Society of the British Isles.
Michael Burke; Klaus Jorde; John M. Buffington
2009-01-01
River systems have been altered worldwide by dams and diversions, resulting in a broad array of environmental impacts. The use of a process-based, hierarchical framework for assessing environmental impacts of dams is explored here in terms of a case study of the Kootenai River, western North America. The goal of the case study is to isolate and quantify the relative...
Code of Federal Regulations, 2011 CFR
2011-07-01
... VA Pwr. Glen Elder Dam & Waconda Lk KS Mitchel Solomon R FIM 722.3204.8 1488.31455.6 1455.61428.0... 820 PL 78-534 USBR. Kirwin Dam & Res KS Phillips N Fork Solomon R F ICR 215.1 89.6 1757.3 1729.2 1729... Webster Dam & Res KS Rocks S Fork Solomon R F IRC 183.4 72.1 1923.7 1892.5 1892.5 1860.0 8480 3772 3772...
Code of Federal Regulations, 2010 CFR
2010-07-01
... VA Pwr. Glen Elder Dam & Waconda Lk KS Mitchel Solomon R FIM 722.3204.8 1488.31455.6 1455.61428.0... 820 PL 78-534 USBR. Kirwin Dam & Res KS Phillips N Fork Solomon R F ICR 215.1 89.6 1757.3 1729.2 1729... Webster Dam & Res KS Rocks S Fork Solomon R F IRC 183.4 72.1 1923.7 1892.5 1892.5 1860.0 8480 3772 3772...
Emergency Fish Restoration Project; Final Report 2002.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LeCaire, Richard
Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleyemore » (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a substantial impact to the economy. During the past several years the Chief Joseph Kokanee Enhancement project has been collecting data pertaining to fish entraining out of the lake through Grand Coulee Dam. During 1996 and 1997 the lake was deeply drawn down to accommodate the limited available water during a drought year and for the highly unusual draw-down of Lake Roosevelt during the critical Northwest power shortage. The goal of the project is to enhance the resident rainbow trout fishery in Lake Roosevelt lost as a result of the unusual operation of Grand Coulee dam during the drought/power shortage.« less
The potential for dams to impact lowland meandering river floodplain geomorphology.
Marren, Philip M; Grove, James R; Webb, J Angus; Stewardson, Michael J
2014-01-01
The majority of the world's floodplains are dammed. Although some implications of dams for riverine ecology and for river channel morphology are well understood, there is less research on the impacts of dams on floodplain geomorphology. We review studies from dammed and undammed rivers and include influences on vertical and lateral accretion, meander migration and cutoff formation, avulsion, and interactions with floodplain vegetation. The results are synthesized into a conceptual model of the effects of dams on the major geomorphic influences on floodplain development. This model is used to assess the likely consequences of eight dam and flow regulation scenarios for floodplain geomorphology. Sediment starvation downstream of dams has perhaps the greatest potential to impact on floodplain development. Such effects will persist further downstream where tributary sediment inputs are relatively low and there is minimal buffering by alluvial sediment stores. We can identify several ways in which floodplains might potentially be affected by dams, with varying degrees of confidence, including a distinction between passive impacts (floodplain disconnection) and active impacts (changes in geomorphological processes and functioning). These active processes are likely to have more serious implications for floodplain function and emphasize both the need for future research and the need for an "environmental sediment regime" to operate alongside environmental flows.
The Potential for Dams to Impact Lowland Meandering River Floodplain Geomorphology
Marren, Philip M.; Grove, James R.; Webb, J. Angus; Stewardson, Michael J.
2014-01-01
The majority of the world's floodplains are dammed. Although some implications of dams for riverine ecology and for river channel morphology are well understood, there is less research on the impacts of dams on floodplain geomorphology. We review studies from dammed and undammed rivers and include influences on vertical and lateral accretion, meander migration and cutoff formation, avulsion, and interactions with floodplain vegetation. The results are synthesized into a conceptual model of the effects of dams on the major geomorphic influences on floodplain development. This model is used to assess the likely consequences of eight dam and flow regulation scenarios for floodplain geomorphology. Sediment starvation downstream of dams has perhaps the greatest potential to impact on floodplain development. Such effects will persist further downstream where tributary sediment inputs are relatively low and there is minimal buffering by alluvial sediment stores. We can identify several ways in which floodplains might potentially be affected by dams, with varying degrees of confidence, including a distinction between passive impacts (floodplain disconnection) and active impacts (changes in geomorphological processes and functioning). These active processes are likely to have more serious implications for floodplain function and emphasize both the need for future research and the need for an “environmental sediment regime” to operate alongside environmental flows. PMID:24587718
Rock Mass Behavior Under Hydropower Embankment Dams: A Two-Dimensional Numerical Study
NASA Astrophysics Data System (ADS)
Bondarchuk, A.; Ask, M. V. S.; Dahlström, L.-O.; Nordlund, E.
2012-09-01
Sweden has more than 190 large hydropower dams, of which about 50 are pure embankment dams and over 100 are concrete/embankment dams. This paper presents results from conceptual analyses of the response of typical Swedish rock mass to the construction of a hydropower embankment dam and its first stages of operation. The aim is to identify locations and magnitudes of displacements that are occurring in the rock foundation and grout curtain after construction of the dam, the first filling of its water reservoir, and after one seasonal variation of the water table. Coupled hydro-mechanical analysis was conducted using the two-dimensional distinct element program UDEC. Series of the simulations have been performed and the results show that the first filling of the reservoir and variation of water table induce largest magnitudes of displacement, with the greatest values obtained from the two models with high differential horizontal stresses and smallest spacing of sub-vertical fractures. These results may help identifying the condition of the dam foundation and contribute to the development of proper maintenance measures, which guarantee the safety and functionality of the dam. Additionally, newly developed dams may use these results for the estimation of the possible response of the rock foundation to the construction.
Dynamic analysis of an inflatable dam subjected to a flood
NASA Astrophysics Data System (ADS)
Lowery, K.; Liapis, S.
A dynamic simulation of the response of an inflatable dam subjected to a flood is carried out to determine the survivability envelope of the dam where it can operate without rupture, or overflow. The free-surface flow problem is solved in two dimensions using a fully nonlinear mixed Eulerian-Lagrangian formulation. The dam is modeled as an elastic shell inflated with air and simply supported from two points. The finite element method is employed to determine the dynamic response of the structure using ABAQUS with a shell element. The problem is solved in the time domain which allows the prediction of a number of transient phenomena such as the generation of upstream advancing waves, the dynamic structural response and structural failure. Failure takes place when the dam either ruptures or overflows. Stresses in the dam material were monitored to determine when rupture occurs. An iterative study was performed to find the serviceability envelope of the dam in terms of the internal pressure and the flood Froude number for two flood depths. It was found that existing inflatable dams are quite effective in suppressing floods for a relatively wide range of flood velocities.
The socio-economics dynamics of Dam on Rural Communities: A case study of Oyan Dam, Nigeria
NASA Astrophysics Data System (ADS)
Ayeni, Amidu; Ojifo, Lawrence
2018-06-01
Dams construction and operations have many benefits, nevertheless, they have also led to lots of negative social, health and human impacts. It is based on this that this study assesses the potential and socio-economics dynamics of Oyan dam between 1980 and 2016. The data used for this study include water level and discharge records of the dam between 2007 and 2016, Landsat imageries of 1984 and 2016 and socio-economic datasets for the period. Analysis of the dam potentials (water supply, agriculture and hydropower) and socio-economic impacts of the dam were carried out using basic statistical tools, land use change anaysis and field survey using questionnaire, structured interview with major stakeholders and personal observation. The results revealed that the water level and storage of the Oyan dam had a relative reduction of about 2 % as well as non-stationarity pattern of water abstraction and production for the period. The landuse classes show all classes decreased in extent except the cultivated landuse that acrued an increased of 19.9 % between 1984 and 2016. Furthermore, commercial water supply varied significantly between 2010 and 2016 while irrigation scheme is grossly under-utilized from the inception in 1983 to 2016. Finally, the result of socio-economic impacts revealed that majority of the selected communities' members are actually not benefiting from the dam and their livelihoods are not from the dam.
Walder, Joseph S.; O'Connor, Jim E.
1997-01-01
Floods from failures of natural and constructed dams constitute a widespread hazard to people and property. Expeditious means of assessing flood hazards are necessary, particularly in the case of natural dams, which may form suddenly and unexpectedly. We revise statistical relations (derived from data for past constructed and natural dam failures) between peak discharge (Qp) and water volume released (V0) or drop in lake level (d) but assert that such relations, even when cast into a dimensionless form, are of limited utility because they fail to portray the effect of breach-formation rate. We then analyze a simple, physically based model of dam-breach formation to show that the hydrograph at the breach depends primarily on a dimensionless parameter η=kV0/gl/2d7/2, where k is the mean erosion rate of the breach and g is acceleration due to gravity. The functional relationship between Qp and η takes asymptotically distinct forms depending on whether η ≪ 1 (relatively slow breach formation or small lake volume) or η ≫ 1 (relatively fast breach formation or large lake volume). Theoretical predictions agree well with data from dam failures for which k, and thus η, can be estimated. The theory thus provides a rapid means of predicting the plausible range of values of peak discharge at the breach in an earthen dam as long as the impounded water volume and the water depth at the dam face can be estimated.
6. View of turbine pit at unit 3 showing servomotor ...
6. View of turbine pit at unit 3 showing servo-motor head (left of center) with piston rods bolted to turbine gate operation ring (right foreground). View to southeast. - Holter Hydroelectric Facility, Dam & Power House, End of Holter Dam Road, Wolf Creek, Lewis and Clark County, MT
Estimation of natural historical flows for the Manitowish River near Manitowish Waters, Wisconsin
Juckem, Paul F.; Reneau, Paul C.; Robertson, Dale M.
2012-01-01
The Wisconsin Department of Natural Resources is charged with oversight of dam operations throughout Wisconsin and is considering modifications to the operating orders for the Rest Lake Dam in Vilas County, Wisconsin. State law requires that the operation orders be tied to natural low flows at the dam. Because the presence of the dam confounds measurement of natural flows, the U.S. Geological Survey, in cooperation with the Wisconsin Department of Natural Resources, installed streamflow-gaging stations and developed two statistical methods to improve estimates of natural flows at the Rest Lake Dam. Two independent methods were used to estimate daily natural flow for the Manitowish River approximately 1 mile downstream of the Rest Lake Dam. The first method was an adjusted drainage-area ratio method, which used a regression analysis that related measured water yield (flow divided by watershed area) from short-term (2009–11) gaging stations upstream of the Manitowish Chain of Lakes to the water yield from two nearby long-term gaging stations in order to extend the flow record (1991–2011). In this approach, the computed flows into the Chain of Lakes at the upstream gaging stations were multiplied by a coefficient to account for the monthly hydrologic contributions (precipitation, evaporation, groundwater, and runoff) associated with the additional watershed area between the upstream gaging stations and the dam at the outlet of the Chain of Lakes (Rest Lake Dam). The second method used to estimate daily natural flow at the Rest Lake Dam was a water-budget approach, which used lake stage and dam outflow data provided by the dam operator. A water-budget model was constructed and then calibrated with an automated parameter-estimation program by matching simulated flow-duration statistics with measured flow-duration statistics at the upstream gaging stations. After calibration of the water-budget model, the model was used to compute natural flow at the dam from 1973 to 2011. Daily natural flows at the dam, as computed by the adjusted drainage-area ratio method and the water-budget method, were used to compute monthly flow-duration values for the period of historical data available for each method. Monthly flow-durations provide a means for evaluating the frequency and range in flows that have been observed for each month over the course of many years. Both methods described the pattern and timing of measured high-flow and low-flow events at the upstream gaging stations. The adjusted drainage-area ratio method generally had smaller residual errors across the full range of observed flows and had smaller monthly biases than the water-budget method. Although it is not possible to evaluate which method may be more "correct" for estimating monthly natural flows at the dam, comparisons between the results of each method indicate that the adjusted drainage-area ratio method may be susceptible to biases at high flows due to isolated storms outside of the Manitowish River watershed. Conversely, it appears that the water-budget method may be susceptible to biases at low flows because of its sensitivity to the accuracy of reported lake stage and outflows, as well as effects of upstream diversions that could not be fully compensated for with this method. Results from both methods are useful for understanding the natural flow patterns at the dam. Flows for both methods have similar patterns, with high median flows in spring and low median flows in late summer. Similarly, the range from monthly high-flow durations to low-flow durations increases during spring, decreases during summer, and increases again during fall. These seasonal patterns illustrate a challenge with interpreting a single value of natural low flow. That is, a natural low flow computed for September is not representative of a natural low flow in April. Moreover, alteration of natural flows caused by storing water in the Chain of Lakes during spring and releasing it in fall causes a change in the timing of high and low flows compared with natural conditions. That is, the lowest reported dam outflows occurred in spring and highest reported outflows occurred in fall, which is opposite the natural patterns.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kuz’menko, A. P., E-mail: apkuzm@gmail.com; Saburov, S. V., E-mail: saburov58@yandex.ru
2016-07-15
The paper puts forward a method for processing data from detailed seismic assessments of HPP dams (dynamic tests). A detailed assessment (hundreds of observation points in dam galleries) is performed with consideration of operating dam equipment and the microseismic noise. It is shown that dynamic oscillation characteristics (natural oscillation frequencies and modes in the main dam axes, the velocities of propagation of elastic waves with given polarization, and so on.) can be determined with sufficient accuracy by using complex transfer functions and pulse characteristics. Monitoring data is processed using data from a detailed assessment, taking account of identified natural oscillationmore » modes and determined ranges of natural frequencies. The spectra of characteristic frequencies thus obtained are used to choose substitution models and estimate the elastic characteristics of the “dam – rock bed” construction system, viz., the modulus of elasticity (the Young modulus), the Poisson ratio, the dam section stiffness with respect to shear, tension and compression and the elastic characteristics of the rock foundation.« less
Wood, Tamara M.; Fuhrer, Gregory J.; Morace, Jennifer L.
1996-01-01
Based on the analysis of data that they have been collecting for several years, the Klamath Tribes recently recommended that the Bureau of Reclamation (Reclamation) modify the operating plan for the dam to make the minimum lake levels for the June-August period more closely resemble pre-dam conditions (Jacob Kann, written commun., 1995). The U.S. Geological Survey (USGS) was asked to analyze the available data for the lake and to assess whether the evidence exists to conclude that year-to-year differences in certain lake water-quality variables are related to year-to-year differences in lake level. The results of the analysis will be used as scientific input in the process of developing an operating plan for the Link River Dam.
Vernieu, William S.
2013-01-01
This report presents the physical and chemical characteristics of water in Lake Powell and from Glen Canyon Dam releases from 1964 through 2012. These data are available in a several electronic formats. Data have been collected throughout this period by various offices of the Bureau of Reclamation and U.S. Geological Survey and are compiled to represent the existing body of chemical and physical information on Lake Powell and Glen Canyon Dam releases. From this record, further interpretation may be made concerning mixing processes in Lake Powell, the movement and fate of advective inflow currents, effects of climate and hydrological variations, and the effects of the operation and structure of Glen Canyon Dam on the quality of water in Lake Powell and from Glen Canyon Dam releases.
Owyhee River intracanyon lava flows: does the river give a dam?
Ely, Lisa L.; Brossy, Cooper C.; House, P. Kyle; Safran, Elizabeth B.; O'Connor, Jim E.; Champion, Duane E.; Fenton, Cassandra R.; Bondre, Ninad R.; Orem, Caitlin A.; Grant, Gordon E.; Henry, Christopher D.; Turrin, Brent D.
2013-01-01
Rivers carved into uplifted plateaus are commonly disrupted by discrete events from the surrounding landscape, such as lava flows or large mass movements. These disruptions are independent of slope, basin area, or channel discharge, and can dominate aspects of valley morphology and channel behavior for many kilometers. We document and assess the effects of one type of disruptive event, lava dams, on river valley morphology and incision rates at a variety of time scales, using examples from the Owyhee River in southeastern Oregon. Six sets of basaltic lava flows entered and dammed the river canyon during two periods in the late Cenozoic ca. 2 Ma–780 ka and 250–70 ka. The dams are strongly asymmetric, with steep, blunt escarpments facing up valley and long, low slopes down valley. None of the dams shows evidence of catastrophic failure; all blocked the river and diverted water over or around the dam crest. The net effect of the dams was therefore to inhibit rather than promote incision. Once incision resumed, most of the intracanyon flows were incised relatively rapidly and therefore did not exert a lasting impact on the river valley profile over time scales >106 yr. The net long-term incision rate from the time of the oldest documented lava dam, the Bogus Rim lava dam (≤1.7 Ma), to present was 0.18 mm/yr, but incision rates through or around individual lava dams were up to an order of magnitude greater. At least three lava dams (Bogus Rim, Saddle Butte, and West Crater) show evidence that incision initiated only after the impounded lakes filled completely with sediment and there was gravel transport across the dams. The most recent lava dam, formed by the West Crater lava flow around 70 ka, persisted for at least 25 k.y. before incision began, and the dam was largely removed within another 35 k.y. The time scale over which the lava dams inhibit incision is therefore directly affected by both the volume of lava forming the dam and the time required for sediment to fill the blocked valley. Variations in this primary process of incision through the lava dams could be influenced by additional independent factors such as regional uplift, drainage integration, or climate that affect the relative base level, discharge, and sediment yield within the watershed. By redirecting the river, tributaries, and subsequent lava flows to different parts of the canyon, lava dams create a distinct valley morphology of flat, broad basalt shelves capping steep cliffs of Tertiary sediment. This stratigraphy is conducive to landsliding and extends the effects of intracanyon lava flows on channel geomorphology beyond the lifetime of the dams.
McNary Dam, Ice Harbor Dam, and Lower Monumental Dam Smolt Monitoring Program; 1996 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hillson, Todd; Lind, Sharon; Price, William
1997-07-01
The Washington Department of Fish & Wildlife (WDFW) assumed responsibility for the Smolt Monitoring Program at McNary Dam on the Columbia River in 1990 and at the new juvenile collection facility at Lower Monumental Dam on the Snake River in 1993. In 1996, Smolt Monitoring Program activities also began at the new juvenile collection facility located at Ice Harbor Dam. This report summarizes the 1996 Smolt Monitoring work at all three sites. The work at Ice Harbor consisted of Gas Bubble Trauma (GBT) monitoring only. In general, the 1996 passage season at both the McNary and Lower Monumental sites canmore » be characterized by reduced passage of juveniles through the collection systems due to elevated river flows and spill, and low (<1%) overall facility mortality rates most likely resulting from cooler water temperatures. In accordance with the National Marine Fisheries Service recommendations (NMFS, 1995) all spring migrants were bypassed at McNary Dam in 1996. Mechanical problems within the McNary collection system resulted in collection and sampling activities being delayed until April 18 at this site, while sampling and collection began on the scheduled starting date of April 1 at Lower Monumental Dam. Monitoring operations were conducted through December 14 at McNary Dam and through October 28 at Lower Monumental Dam. An ongoing transportation evaluation summer migrant marking program was conducted at McNary Dam in 1996 by the NMFS. This necessitated the sampling of 394,211 additional fish beyond the recommended sampling guidelines. All total, 509,237 and 31,219 juvenile salmonids were anesthetized and individually counted, examined for scale loss, injuries, and brands by WDFW Smolt Monitoring personnel in 1996 at McNary Dam and Lower Monumental Dam, respectively.« less
NASA Astrophysics Data System (ADS)
Rouissat, Bouchrit; Smail, N.; Zenagui, S.
2017-12-01
In recent years, and under constraints caused by persistent drought, Algeria has launched a new mobilization strategy for surface water resources from small and medium dams. However, by making a review of the studies and achievements of twenty small dams in the west of Algeria, some deficiencies appeared. In addition to reservoir siltation assessment, operation spillways have been the major constraint on the reliability of these types of dams. The objective of this paper is to use the roller compacted concrete (RCC) for small dams' design for the benefit it offers and its ability to incorporate spillways. The development of this reflection was applied to the Khneg Azir earth dam situated in southwest of Algeria. Its uncontrolled lateral spillway has registered significant damage following the flood of October 2005, amounted, at that time, to more than 100 million Algerian dinars (1 million US Dollars). The present research encompasses a technical and economical comparative analysis concerning multiple criteria dam design types coupled with the conjugation of the spillways. Thus, on the basis of financial estimates calculated for all design types, the variant RCC remains competitive with that of the earth dam's spillway isolated (Less than 40% of the cost). To assess the mechanical behavior of the foundations for both types of dams, (earth and RCC dams), numerical modeling has been undertaken, according to the comparative analysis of deformations in the foundations. Analysis of deformations showed that the average foundation deformations was between (0.052-0.85) m for earth dam and (0.023-0.373) m for RCC dam. These economical and technical considerations open up important prospects for the use of RCC in the design of small dams.
Simulation analysis of temperature control on RCC arch dam of hydropower station
NASA Astrophysics Data System (ADS)
XIA, Shi-fa
2017-12-01
The temperature analysis of roller compacted concrete (RCC) dam plays an important role in their design and construction. Based on three-dimensional finite element method, in the computation of temperature field, many cases are included, such as air temperature, elevated temperature by cement hydration heat, concrete temperature during placing, the influence of water in the reservoir, and boundary temperature. According to the corresponding parameters of RCC arch dam, the analysis of temperature field and stress field during the period of construction and operation is performed. The study demonstrates that detailed thermal stress analysis should be performed for RCC dams to provide a basis to minimize and control the occurrence of thermal cracking.
New evidence of Yangtze delta recession after closing of the Three Gorges Dam
Luo, X. X.; Yang, S. L.; Wang, R. S.; Zhang, C. Y.; Li, P.
2017-01-01
Many deltas are likely undergoing net erosion because of rapid decreases in riverine sediment supply and rising global sea levels. However, detecting erosion in subaqueous deltas is usually difficult because of the lack of bathymetric data. In this study, by comparing bathymetric data between 1981 and 2012 and surficial sediment grain sizes from the Yangtze subaqueous delta front over the last three decades, we found severe erosion and significant sediment coarsening in recent years since the construction of Three Gorges Dam (TGD), the largest dam in the world. We attributed these morphological and sedimentary variations mainly to the human-induced drastic decline of river sediment discharge. Combined with previous studies based on bathymetric data from different areas of the same delta, we theorize that the Yangtze subaqueous delta is experiencing overall (net) erosion, although local accumulation was also noted. We expect that the Yangtze sediment discharge will further decrease in the near future because of construction of new dams and delta recession will continue to occur. PMID:28145520
NASA Astrophysics Data System (ADS)
Mergili, Martin; Schneider, Demian; Andres, Norina; Worni, Raphael; Gruber, Fabian; Schneider, Jean F.
2010-05-01
Lake Outburst Floods can evolve from complex process chains like avalanches of rock or ice that produce flood waves in a lake which may overtop and eventually breach glacial, morainic, landslide, or artificial dams. Rising lake levels can lead to progressive incision and destabilization of a dam, to enhanced ground water flow (piping), or even to hydrostatic failure of ice dams which can cause sudden outflow of accumulated water. These events often have a highly destructive potential because a large amount of water is released in a short time, with a high capacity to erode loose debris, leading to a powerful debris flow with a long travel distance. The best-known example of a lake outburst flood is the Vajont event (Northern Italy, 1963), where a landslide rushed into an artificial lake which spilled over and caused a flood leading to almost 2000 fatalities. Hazards from the failure of landslide dams are often (not always) fairly manageable: most breaches occur in the first few days or weeks after the landslide event and the rapid construction of a spillway - though problematic - has solved some hazardous situations (e.g. in the case of Hattian landslide in 2005 in Pakistan). Older dams, like Usoi dam (Lake Sarez) in Tajikistan, are usually fairly stable, though landsildes into the lakes may create floodwaves overtopping and eventually weakening the dams. The analysis and the mitigation of glacial lake outburst flood (GLOF) hazard remains a challenge. A number of GLOFs resulting in fatalities and severe damage have occurred during the previous decades, particularly in the Himalayas and in the mountains of Central Asia (Pamir, Tien Shan). The source area is usually far away from the area of impact and events occur at very long intervals or as singularities, so that the population at risk is usually not prepared. Even though potentially hazardous lakes can be identified relatively easily with remote sensing and field work, modeling and predicting of GLOFs (and also the outburst of landslide-dammed lakes) remains a challenge: • The knowledge about the onset of the process is often limited (bathymetry of the lakes, subsurface water, properties of dam (content of ice), type of dam breach, understanding of process chains and interactions). • The size of glacial lakes may change rapidly but continuously, and many lakes break out within a short time after their development. Continuous monitoring is therefore required to keep updated on the existing hazards. • Also the outburst of small glacial lakes may lead to significant debris floods or even debris flows if there is plenty of erodible material available. • The available modeling software packages are of limited suitability for lake outburst floods: e.g. software developed by the hydrological community is specialized to simulate (debris) floods with input hydrographs on moderately steep flow channels and with lower sediment loads. In contrast to this, programs for rapid mass movements are better suited on steeper slopes and sudden onset of the movement. The typical characteristics of GLOFs are in between and vary for different channel sections. In summary, the major bottlenecks remain in deriving realistic or worst case scenarios and predicting their magnitude and area of impact. This mainly concerns uncertainties in the dam break process, involved volumes, erosion rates, changing rheologies, and the limited capabilities of available software packages to simulate process interactions and transformations such as the development of a hyperconcentrated flow into a debris flow. In addition, many areas prone to lake outburst floods are located in developing countries with a limited scope of the threatened population for decision-making and limited resources for mitigation.
Evolution and outburst risk analysis of moraine-dammed lakes in the central Chinese Himalaya
NASA Astrophysics Data System (ADS)
Shijin, Wang; Shitai, Jiao
2015-04-01
The recent evolution and outburst risk of two typical moraine-dammed lakes, Galong and Gangxi, central Chinese Himalaya, are analyzed using topographic maps from 1974 and Landsat satellite imagery acquired in 1988, 2000 and 2014. The datasets show the areas of Galong and Gangxi lakes increasing at rates of 0.45 and 0.34 km2/year during the period 1974-2014, an expansion of 501% and 107%, respectively, in the past 41 years, while the areas of the parent glaciers, Reqiang and Jipucong decreased by 44.22% and 37.76%, respectively. The accelerating retreat of the glaciers not only reflects their generally negative mass balance but is consistent with the rapid expansion of the moraine-dammed lakes. When acted upon by external forces such as earthquakes, heavy rainfall, rapid melting of glaciers and dead ice, and snow/ice/rock avalanches, these lakes can become extremely dangerous, easily forming outburst mudslides, which can potentially spread to the Poiqu river basin and develop into cross-border (China and Nepal) GLOF disasters. Therefore, there is an urgent need to strengthen integrated risk management of glacial lake outburst disasters with multiple objectives and modes.
Suzuki, F. M.; Dunham, Jason B.; Silva, L. G. M.; Alves, C. B. M.; Pompeu, P.S.
2017-01-01
Fish attempting to move upstream through hydroelectric dams can be trapped and killed in turbines. Understanding fish movement patterns can provide useful insights for how to manage dam operations to minimize fish kill in turbines. We evaluated the movements of two migratory fish (Curimba-Prochilodus argenteus and Mandi-Pimelodus maculatus) using acoustic telemetry in the tailrace of Três Marias Dam (São Francisco River, Brazil) from 31 October 2011 to 16 February 2012. The majority of tagged fish left the tailrace in less than one week; however, some individuals returned, performing several visits to the tailrace. Mandi remained longer in the tailrace than Curimba. The number of visits was influenced by diel period, turbine and spillway discharge. Although the diel period was the only important contributor to the visits performed by Curimba, the movements of Mandi were significantly influenced by three factors. We found that whereas Curimba was predominantly diurnal, Mandi showed nocturnal habits. Additionally, visits of Mandi were significantly greater during higher turbine and spillway discharge. We discuss the implications of these results for understanding fish movements in the Três Marias Dam tailrace and their potential implications for adapting hydroelectric operations to minimize fish kills.
Passage and survival probabilities of juvenile Chinook salmon at Cougar Dam, Oregon, 2012
Beeman, John W.; Evans, Scott D.; Haner, Philip V.; Hansel, Hal C.; Hansen, Amy C.; Smith, Collin D.; Sprando, Jamie M.
2014-01-01
This report describes studies of juvenile-salmon dam passage and apparent survival at Cougar Dam, Oregon, during two operating conditions in 2012. Cougar Dam is a 158-meter tall rock-fill dam used primarily for flood control, and passes water through a temperature control tower to either a powerhouse penstock or to a regulating outlet (RO). The temperature control tower has moveable weir gates to enable water of different elevations and temperatures to be drawn through the dam to control water temperatures downstream. A series of studies of downstream dam passage of juvenile salmonids were begun after the National Oceanic and Atmospheric Administration determined that Cougar Dam was impacting the viability of anadromous fish stocks. The primary objectives of the studies described in this report were to estimate the route-specific fish passage probabilities at the dam and to estimate the survival probabilities of fish passing through the RO. The first set of dam operating conditions, studied in November, consisted of (1) a mean reservoir elevation of 1,589 feet, (2) water entering the temperature control tower through the weir gates, (3) most water routed through the turbines during the day and through the RO during the night, and (4) mean RO gate openings of 1.2 feet during the day and 3.2 feet during the night. The second set of dam operating conditions, studied in December, consisted of (1) a mean reservoir elevation of 1,507 ft, (2) water entering the temperature control tower through the RO bypass, (3) all water passing through the RO, and (4) mean RO gate openings of 7.3 feet during the day and 7.5 feet during the night. The studies were based on juvenile Chinook salmon (Oncorhynchus tshawytscha) surgically implanted with radio transmitters and passive integrated transponder (PIT) tags. Inferences about general dam passage percentage and timing of volitional migrants were based on surface-acclimated fish released in the reservoir. Dam passage and apparent survival probabilities were estimated using the Route-Specific-Survival Model with data from surface-acclimated fish released near the water surface directly upstream of the temperature control tower (treatment group) and slightly downstream of the dam (control group). In this study, apparent survival is the joint probability of surviving and migrating through the study area during the life of the transmitters. Two rearing groups were used to enable sufficient sample sizes for the studies. The groups differed in feed type, and for the December study only, the rearing location. Fish from each group were divided nearly equally among all combinations of release sites, release times, and surgeons. The sizes, travel times, and survivals of the two rearing groups were similar. There were statistical differences in fish lengths and travel times of the two groups, but they were small and likely were not biologically meaningful. There also was evidence of a difference in single-release estimates of survival between the rearing groups during the December study, but the differences had little effect on the relative survival estimates so the analyses of passage and survival were based on data from the rearing groups pooled. Conditions during the December study were more conducive to passing volitionally migrating fish than conditions during the November study. The passage percentage of the fish released in the reservoir was similar between studies (about 70 percent), but the passage occurred in a median of 1.0 day during the December study and a median of 9.3 days during the November study. More than 93 percent of the dam passage of volitionally migrating fish occurred at night during each study. This finding corroborates results of previous studies at Cougar Dam and suggests that the operating conditions at night are most important to volitionally migrating fish, given the current configuration of the dam. Most fish released near the temperature control tower passed through the RO. A total of 92.2 percent of the treatment group passed through the RO during the November study and the RO was the only route open during the December study. The assumptions of the survival model were either met or adjusted for during each study. There was little evidence that tagger skill or premature failure of radio transmitters had an effect on survival estimates. There were statistically significant differences in travel times between treatment and control groups through several of the river reaches they had in common, but the differences were typically only a few hours, and the two groups likely experienced the same in-river conditions. There was direct evidence of bias due to detection of euthanized fish with live transmitters released as part of the study design. The bias was ameliorated by adjusting the survival estimates for the probability of detecting dead fish with live transmitters, which reduced the estimated survival probabilities by about 0.02. The data and models indicated that the treatment effect was not fully expressed until the study reach terminating with Marshall Island Park on the Willamette River, a distance of 105.8 kilometers downstream of Cougar Dam. This was the first reach in which the 95-percent confidence interval of the estimated reach-specific relative survival overlapped 1.0, indicating similar survival of treatment and control groups. The median travel time of the treatment group from release to Marshall Island Park was 1.64 days during the November study and 1.36 days during the December study. The survival probability of fish that passed into the RO was greater during the December study than during the November study. The relative survival probability of fish passing through the RO was 0.4594 (standard error [SE] 0.0543) during the November study and 0.7389 (SE 0.1160) during the December study. These estimates represent relative survival probabilities from release near Cougar Dam to the Marshall Island site. The estimated survival probability of RO passage was lower than previous studies based on balloon and PIT tags, but higher than a similar study based on radio transmitters. We suggest that, apart from dam operations, the differences in survival primarily are due to the release location. We hypothesize that the balloon- and PIT-tagged fish released through a hose at a point near the RO gate opening experienced more benign conditions than the radio-tagged fish passing the RO volitionally. This hypothesis could be tested with further study. An alternative hypothesis is that some live fish remained within the study area beyond the life of their radio transmitter. The results from these and previous studies indicate that entrainment and survival of juvenile salmonids passing Cougar Dam varies with dam operating conditions. The condition most conducive to dam passage has been the discharge and low pool elevation condition tested during December 2012. That condition included large RO gate openings and was the condition with the highest dam passage survival.
NASA Astrophysics Data System (ADS)
Schwanghart, Wolfgang; Worni, Raphael; Huggel, Christian; Stoffel, Markus; Korup, Oliver
2016-07-01
Himalayan water resources attract a rapidly growing number of hydroelectric power projects (HPP) to satisfy Asia’s soaring energy demands. Yet HPP operating or planned in steep, glacier-fed mountain rivers face hazards of glacial lake outburst floods (GLOFs) that can damage hydropower infrastructure, alter water and sediment yields, and compromise livelihoods downstream. Detailed appraisals of such GLOF hazards are limited to case studies, however, and a more comprehensive, systematic analysis remains elusive. To this end we estimate the regional exposure of 257 Himalayan HPP to GLOFs, using a flood-wave propagation model fed by Monte Carlo-derived outburst volumes of >2300 glacial lakes. We interpret the spread of thus modeled peak discharges as a predictive uncertainty that arises mainly from outburst volumes and dam-breach rates that are difficult to assess before dams fail. With 66% of sampled HPP are on potential GLOF tracks, up to one third of these HPP could experience GLOF discharges well above local design floods, as hydropower development continues to seek higher sites closer to glacial lakes. We compute that this systematic push of HPP into headwaters effectively doubles the uncertainty about GLOF peak discharge in these locations. Peak discharges farther downstream, in contrast, are easier to predict because GLOF waves attenuate rapidly. Considering this systematic pattern of regional GLOF exposure might aid the site selection of future Himalayan HPP. Our method can augment, and help to regularly update, current hazard assessments, given that global warming is likely changing the number and size of Himalayan meltwater lakes.
Finer, Matt; Jenkins, Clinton N.
2012-01-01
Due to rising energy demands and abundant untapped potential, hydropower projects are rapidly increasing in the Neotropics. This is especially true in the wet and rugged Andean Amazon, where regional governments are prioritizing new hydroelectric dams as the centerpiece of long-term energy plans. However, the current planning for hydropower lacks adequate regional and basin-scale assessment of potential ecological impacts. This lack of strategic planning is particularly problematic given the intimate link between the Andes and Amazonian flood plain, together one of the most species rich zones on Earth. We examined the potential ecological impacts, in terms of river connectivity and forest loss, of the planned proliferation of hydroelectric dams across all Andean tributaries of the Amazon River. Considering data on the full portfolios of existing and planned dams, along with data on roads and transmission line systems, we developed a new conceptual framework to estimate the relative impacts of all planned dams. There are plans for 151 new dams greater than 2 MW over the next 20 years, more than a 300% increase. These dams would include five of the six major Andean tributaries of the Amazon. Our ecological impact analysis classified 47% of the potential new dams as high impact and just 19% as low impact. Sixty percent of the dams would cause the first major break in connectivity between protected Andean headwaters and the lowland Amazon. More than 80% would drive deforestation due to new roads, transmission lines, or inundation. We conclude with a discussion of three major policy implications of these findings. 1) There is a critical need for further strategic regional and basin scale evaluation of dams. 2) There is an urgent need for a strategic plan to maintain Andes-Amazon connectivity. 3) Reconsideration of hydropower as a low-impact energy source in the Neotropics. PMID:22529979
Finer, Matt; Jenkins, Clinton N
2012-01-01
Due to rising energy demands and abundant untapped potential, hydropower projects are rapidly increasing in the Neotropics. This is especially true in the wet and rugged Andean Amazon, where regional governments are prioritizing new hydroelectric dams as the centerpiece of long-term energy plans. However, the current planning for hydropower lacks adequate regional and basin-scale assessment of potential ecological impacts. This lack of strategic planning is particularly problematic given the intimate link between the Andes and Amazonian flood plain, together one of the most species rich zones on Earth. We examined the potential ecological impacts, in terms of river connectivity and forest loss, of the planned proliferation of hydroelectric dams across all Andean tributaries of the Amazon River. Considering data on the full portfolios of existing and planned dams, along with data on roads and transmission line systems, we developed a new conceptual framework to estimate the relative impacts of all planned dams. There are plans for 151 new dams greater than 2 MW over the next 20 years, more than a 300% increase. These dams would include five of the six major Andean tributaries of the Amazon. Our ecological impact analysis classified 47% of the potential new dams as high impact and just 19% as low impact. Sixty percent of the dams would cause the first major break in connectivity between protected Andean headwaters and the lowland Amazon. More than 80% would drive deforestation due to new roads, transmission lines, or inundation. We conclude with a discussion of three major policy implications of these findings. 1) There is a critical need for further strategic regional and basin scale evaluation of dams. 2) There is an urgent need for a strategic plan to maintain Andes-Amazon connectivity. 3) Reconsideration of hydropower as a low-impact energy source in the Neotropics.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Gary E.; Anglea, Steven M.; Adams, Noah S.
2005-02-28
A surface flow bypass provides a route in the upper water column for naturally, surface-oriented juvenile salmonids to safely migrate through a hydroelectric dam. Surface flow bypasses were recommended in several regional salmon recovery plans as a means to increase passage survival of juvenile salmonids at Columbia and Snake River dams. A prototype surface flow bypass, called the SBC, was retrofit on Lower Granite Dam and evaluated from 1996 to 2000 using biotelemetry and hydroacoustic techniques. In terms of passage efficiency, the best SBC configurations were a surface skimmer (99 m3/s [3,500 cfs], three entrances 5 m wide, 5 mmore » deep and one entrance 5 m wide, 15 m deep) and a single chute (99 m3/s, one entrance 5 m wide, 8.5 m deep). They each passed 62 ? 3% (95% confidence interval) of the total juvenile fish population that entered the section of the dam with the SBC entrances (Turbine Units 4-5). Smooth entrance shape and concentrated surface flow characteristics of these configurations are worth pursuing in designs for future surface flow bypasses. In addition, a guidance wall in the Lower Granite Dam forebay diverted the following percentages of juvenile salmonids away from Turbine Units 1-3 toward other passage routes, including the SBC: run-at-large 79 ? 18%; hatchery steelhead 86%; wild steelhead 65%; and yearling chinook salmon 66%. When used in combination with spill or turbine intake screens, a surface flow bypass with a guidance wall can produce a high level (> 90% of total project passage) of non-turbine passage and provide operational flexibility to fisheries managers and dam operators responsible for enhancing juvenile salmonid survival.« less
Mueller, Erich R.; Grams, Paul E.; Schmidt, John C.; Hazel, Joseph E.; Alexander, Jason S.; Kaplinski, Matt
2014-01-01
Prior to the construction of large dams on the Green and Colorado Rivers, annual floods aggraded sandbars in lateral flow-recirculation eddies with fine sediment scoured from the bed and delivered from upstream. Flows greater than normal dam operations may be used to mimic this process in an attempt to increase time-averaged sandbar size. These controlled floods may rebuild sandbars, but sediment deficit conditions downstream from the dams restrict the frequency that controlled floods produce beneficial results. Here, we integrate complimentary, long-term monitoring data sets from the Colorado River in Marble and Grand Canyons downstream from Glen Canyon dam and the Green River in the Canyon of Lodore downstream from Flaming Gorge dam. Since the mid-1990s, several controlled floods have occurred in these canyon rivers. These controlled floods scour fine sediment from the bed and build sandbars in eddies, thus increasing channel relief. These changes are short-lived, however, as interflood dam operations erode sandbars within several months to years. Controlled flood response and interflood changes in bed elevation are more variable in Marble Canyon and Grand Canyon, likely reflecting more variable fine sediment supply and stronger transience in channel bed sediment storage. Despite these differences, neither system shows a trend in fine-sediment storage during the period in which controlled floods were monitored. These results demonstrate that controlled floods build eddy sandbars and increase channel relief for short interflood periods, and this response may be typical in other dam-influenced canyon rivers. The degree to which these features persist depends on the frequency of controlled floods, but careful consideration of sediment supply is necessary to avoid increasing the long-term sediment deficit.
Survival of Atlantic salmon Salmo salar smolts through a hydropower complex.
Stich, D S; Bailey, M M; Zydlewski, J D
2014-10-01
This study evaluated Atlantic salmon Salmo salar smolt survival through the lower Penobscot River, Maine, U.S.A., and characterized relative differences in proportional use and survival through the main-stem of the river and an alternative migration route, the Stillwater Branch. The work was conducted prior to removal of two main-stem dams and operational changes in hydropower facilities in the Stillwater Branch. Survival and proportional use of migration routes in the lower Penobscot were estimated from multistate (MS) models based on 6 years of acoustic telemetry data from 1669 smolts and 2 years of radio-telemetry data from 190 fish. A small proportion (0·12, 95% c.i. = 0·06-0·25) of smolts used the Stillwater Branch, and mean survival through the two operational dams in this part of the river was relatively high (1·00 and 0·97). Survival at Milford Dam, the dam that will remain in the main-stem of the Penobscot River, was relatively low (0·91), whereas survival through two dams that were removed was relatively high (0·99 and 0·98). Smolt survival could decrease in the Stillwater Branch with the addition of two new powerhouses while continuing to meet fish passage standards. The effects of removing two dams in the main-stem are expected to be negligible for smolt survival based on high survival observed from 2005 to 2012 at those locations. Survival through Milford Dam was been well below current regulatory standards, and thus improvement of passage at this location offers the best opportunity for improving overall smolt survival in the lower river. © 2014 The Fisheries Society of the British Isles.
Survival of Atlantic salmon Salmo salar smolts through a hydropower complex
Stich, D.S.; Bailey, M.M.; Zydlewski, Joseph D.
2014-01-01
This study evaluated Atlantic salmon Salmo salar smolt survival through the lower Penobscot River, Maine, U.S.A., and characterized relative differences in proportional use and survival through the main-stem of the river and an alternative migration route, the Stillwater Branch. The work was conducted prior to removal of two main-stem dams and operational changes in hydropower facilities in the Stillwater Branch. Survival and proportional use of migration routes in the lower Penobscot were estimated from multistate (MS) models based on 6 years of acoustic telemetry data from 1669 smolts and 2 years of radio-telemetry data from 190 fish. A small proportion (0·12, 95% c.i. = 0·06–0·25) of smolts used the Stillwater Branch, and mean survival through the two operational dams in this part of the river was relatively high (1·00 and 0·97). Survival at Milford Dam, the dam that will remain in the main-stem of the Penobscot River, was relatively low (0·91), whereas survival through two dams that were removed was relatively high (0·99 and 0·98). Smolt survival could decrease in the Stillwater Branch with the addition of two new powerhouses while continuing to meet fish passage standards. The effects of removing two dams in the main-stem are expected to be negligible for smolt survival based on high survival observed from 2005 to 2012 at those locations. Survival through Milford Dam was been well below current regulatory standards, and thus improvement of passage at this location offers the best opportunity for improving overall smolt survival in the lower river.
NASA Astrophysics Data System (ADS)
Yaghmaei, Hiva; Sadeghi, Seyed Hamidreza; Moradi, Hamidreza; Gholamalifard, Mehdi
2018-02-01
Trends in flow discharge, temperature and rainfall from the Qom Rood Watershed, Iran, for a period of 1979-2016 were analyzed at monthly and annual time scales. Trend analyses were conducted using the Mann-Kendall test, the double-mass curve of mean annual discharge versus rainfall, and rainfall-runoff relationship before and after the 15 Khordad Dam operation. Multiple regression of flow discharge against rainfall and temperature was used to determine the residual trend at four meteorological and hydrological stations located upstream and downstream of the Qom Rood Watershed. Results showed that the temperature at the upstream and downstream stations did not have any significant trend, but a significant decreasing trend (P < .05) in rainfall was detected only in May (z = -1.66) at the downstream stations. There was a significant positive trend (P < .05) in rainfall in February (z = 2.22) and July (z = 2.15) at the upstream stations, and in October (z = 2.3) and November (z = 1.8) at the downstream stations. However, there was a noticeable decrease in monthly and annual flow discharge, and residual trend at 99% significance level at the downstream stations. At the upstream stations, the flow discharges had significant (P < .05) declining trend in all months, but annual flow discharge did not change significantly. Analysis of double mass curve between runoff and rainfall at the downstream stations showed an inconsistency in the line slope concordant with the time of 15 Khordad Dam operation. Annual mean discharge at the upstream stations did not show a significant change before and after 15 Khordad Dam operation. However, annual flow magnitude decreased significantly by 87.5 and 81.7% in Shad Abad and KoohSefid, respectively. These results confirmed that natural driving forces did not affect flow discharge changes and the observed decreasing tendency in flow discharge at the downstream stations was due to 15 Khordad Dam, and at the upstream stations due to diversion/storage dams. These findings highlighted the role of human interference in changing the hydrologic regime in the study area based on which appropriate adaptive decisions can be made.
NASA Astrophysics Data System (ADS)
Konrad, C. P.; Olden, J.
2013-12-01
Dams impose a host of impacts on freshwater and estuary ecosystems. In recent decades, dam releases for ecological outcomes have been increasingly implemented to mitigate for these impacts and are gaining global scope. Many are designed and conducted using an experimental framework. A recent review of large-scale flow experiments (FE) evaluates their effectiveness and identifies ways to enhance their scientific and management value. At least 113 large-scale flow experiments affecting 98 river systems globally have been documented over the last 50 years. These experiments span a range of flow manipulations from single pulse events to comprehensive changes in flow regime across all seasons and different water year types. Clear articulation of experimental objectives, while not universally practiced, was crucial for achieving management outcomes and changing dam operating policies. We found a strong disparity between the recognized ecological importance of a multi faceted flow regimes and discrete flow events that characterized 80% of FEs. Over three quarters of FEs documented both abiotic and biotic outcomes, but only one third examined multiple trophic groups, thus limiting how this information informs future dam management. Large-scale flow experiments represent a unique opportunity for integrated biophysical investigations for advancing ecosystem science. Nonetheless, they must remain responsive to site-specific issues regarding water management, evolving societal values and changing environmental conditions and, in particular, can characterize the incremental benefits from and necessary conditions for changing dam operations to improve ecological outcomes. This type of information is essential for understanding the full context of value based trade-offs in benefits and costs from different dam operations that can serve as an empirical basis for societal decisions regarding water and ecosystem management. FE may be the best approach available to managers for resolving critical uncertainties that impede decision making in adaptive settings, for example, when we lack sufficient understanding to model biophysical responses to alternative operations. Integrated long term monitoring of biotic abiotic responses and defining clear management based objectives highlight ways for improving the efficiency and value of FEs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Magnusson, A. K.; LaGory, K. E.; Hayse, J. W.
2010-06-25
Flaming Gorge Dam, a hydroelectric facility operated by the Bureau of Reclamation (Reclamation), is located on the Green River in Daggett County, northeastern Utah. Until recently, and since the early 1990s, single daily peak releases or steady flows have been the operational pattern of the dam during the winter period. However, releases from Flaming Gorge Reservoir followed a double-peak pattern (two daily flow peaks) during the winters of 2006-2007 and 2008-2009. Because there is little recent long-term history of double-peaking at Flaming Gorge Dam, the potential effects of double-peaking operations on trout body condition in the dam's tailwater are notmore » known. A study plan was developed that identified research activities to evaluate potential effects from winter double-peaking operations (Hayse et al. 2009). Along with other tasks, the study plan identified the need to conduct a statistical analysis of historical trout condition and macroinvertebrate abundance to evaluate the potential effects of hydropower operations. The results from analyses based on the combined size classes of trout (85-630 mm) were presented in Magnusson et al. (2008). The results of this earlier analysis suggested possible relationships between trout condition and flow, but concern that some of the relationships resulted from size-based effects (e.g., apparent changes in condition may have been related to concomitant changes in size distribution, because small trout may have responded differently to flow than large trout) prompted additional analysis of within-size class relationships. This report presents the results of analyses of three different size classes of trout (small: 200-299 mm, medium: 300-399 mm, and large: {ge}400 mm body length). We analyzed historical data to (1) describe temporal patterns and relationships among flows, benthic macroinvertebrate abundance, and condition of brown trout (Salmo trutta) and rainbow trout (Oncorhynchus mykiss) in the tailwaters of Flaming Gorge Dam, and to (2) evaluate the relative importance of the effects of flow (i.e., flow volumes and flow variability), trout abundance (catch per unit effort [CPUE]), and benthic macroinvertebrate abundance on trout condition for different size classes of trout.« less
Simulating future water temperatures in the North Santiam River, Oregon
Buccola, Norman; Risley, John C.; Rounds, Stewart A.
2016-01-01
A previously calibrated two-dimensional hydrodynamic and water-quality model (CE-QUAL-W2) of Detroit Lake in western Oregon was used in conjunction with inflows derived from Precipitation-Runoff Modeling System (PRMS) hydrologic models to examine in-lake and downstream water temperature effects under future climate conditions. Current and hypothetical operations and structures at Detroit Dam were imposed on boundary conditions derived from downscaled General Circulation Models in base (1990–1999) and future (2059–2068) periods. Compared with the base period, future air temperatures were about 2 °C warmer year-round. Higher air temperature and lower precipitation under the future period resulted in a 23% reduction in mean annual PRMS-simulated discharge and a 1 °C increase in mean annual estimated stream temperatures flowing into the lake compared to the base period. Simulations incorporating current operational rules and minimum release rates at Detroit Dam to support downstream habitat, irrigation, and water supply during key times of year resulted in lower future lake levels. That scenario results in a lake level that is above the dam’s spillway crest only about half as many days in the future compared to historical frequencies. Managing temperature downstream of Detroit Dam depends on the ability to blend warmer water from the lake’s surface with cooler water from deep in the lake, and the spillway is an important release point near the lake’s surface. Annual average in-lake and release temperatures from Detroit Lake warmed 1.1 °C and 1.5 °C from base to future periods under present-day dam operational rules and fill schedules. Simulated dam operations such as beginning refill of the lake 30 days earlier or reducing minimum release rates (to keep more water in the lake to retain the use of the spillway) mitigated future warming to 0.4 and 0.9 °C below existing operational scenarios during the critical autumn spawning period for endangered salmonids. A hypothetical floating surface withdrawal at Detroit Dam improved temperature control in summer and autumn (0.6 °C warmer in summer, 0.6 °C cooler in autumn compared to existing structures) without altering release rates or lake level management rules.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Peter N.; Rayton, Michael D.; Nass, Bryan L.
2007-06-01
The Confederated Tribes of the Colville Reservation (Colville Tribes) identified the need for collecting baseline census data on the timing and abundance of adult salmonids in the Okanogan River Basin in order to determine basin and tributary-specific spawner distributions, evaluate the status and trends of natural salmonid production in the basin, document local fish populations, and augment existing fishery data. This report documents the design, installation, operation and evaluation of mainstem and tributary video systems in the Okanogan River Basin. The species-specific data collected by these fish enumeration systems are presented along with an evaluation of the operation of amore » facility that provides a count of fish using an automated method. Information collected by the Colville Tribes Fish & Wildlife Department, specifically the Okanogan Basin Monitoring and Evaluation Program (OBMEP), is intended to provide a relative abundance indicator for anadromous fish runs migrating past Zosel Dam and is not intended as an absolute census count. Okanogan Basin Monitoring and Evaluation Program collected fish passage data between October 2005 and December 2006. Video counting stations were deployed and data were collected at two locations in the basin: on the mainstem Okanogan River at Zosel Dam near Oroville, Washington, and on Bonaparte Creek, a tributary to the Okanogan River, in the town of Tonasket, Washington. Counts at Zosel Dam between 10 October 2005 and 28 February 2006 are considered partial, pilot year data as they were obtained from the operation of a single video array on the west bank fishway, and covered only a portion of the steelhead migration. A complete description of the apparatus and methodology can be found in 'Fish Enumeration Using Underwater Video Imagery - Operational Protocol' (Nass 2007). At Zosel Dam, totals of 57 and 481 adult Chinook salmon were observed with the video monitoring system in 2005 and 2006, respectively. Run timing for Chinook in 2006 indicated that peak passage occurred in early October and daily peak passage was noted on 5 October when 52 fish passed the dam. Hourly passage estimates of Chinook salmon counts for 2005 and 2006 at Zosel Dam revealed a slight diel pattern as Chinook passage events tended to remain low from 1900 hours to 0600 hours relative to other hours of the day. Chinook salmon showed a slight preference for passing the dam through the video chutes on the east bank (52%) relative to the west bank (48%). A total of 48 adult sockeye salmon in 2005 and 19,245 in 2006 were counted passing through the video chutes at Zosel Dam. The 2006 run timing pattern was characterized by a large peak in passage from 3 August through 10 August when 17,698 fish (92% of total run observed for the year) were observed passing through the video chutes. The daily peak of 5,853 fish occurred on 4 August. Hourly passage estimates of sockeye salmon counts for 2005 and 2006 at the dam showed a strong diel pattern with increased passage during nighttime hours relative to daytime hours. Sockeye showed a strong preference for passing Zosel Dam on the east bank (72%) relative to the west bank (28%). A total of 298 adult upstream-migrating steelhead were counted at Zosel Dam in 2005 and 2006, representing the 2006 cohort based on passage data from 5 October 2005 through 15 July 2006. Eighty-seven percent (87%) of the total steelhead observed passed the dam between 23 March and 25 April with a peak passage occurring on 6 April when 31 fish were observed. Steelhead passage at Zosel Dam exhibited no diel pattern. In contrast to both Chinook and sockeye salmon, steelhead were shown to have a preference for passing the dam on the west bank (71%) relative to the east bank (29%). Both Chinook and sockeye passage at Zosel Dam were influenced by Okanogan River water temperature. When water temperatures peaked in late July (daily mean exceeded 24 C and daily maximum exceeded 26.5 C), Chinook and sockeye counts went to zero. A subsequent decrease in water temperature resulted in sharp increases in both Chinook and sockeye passage. A total of six steelhead were observed with the video monitoring system at Bonaparte Creek in 2006, with three passage events occurring on 29 March and one each on 20, 21, and 23 April. This system was operational for only a portion of the migration.« less
Xiao, Yan; Li, Zhe; Guo, Jinsong; Fang, Fang; Smith, Val H
2016-03-01
The Three Gorges Dam (TGD) has greatly altered ecological and environmental conditions within the reservoir region, but it is not known how these changes affect phytoplankton structure and dynamics. Here, a bimonthly monitoring program was implemented from 2007 to 2009 to study the impact of damming on phytoplankton assemblages in the backwater area of the Pengxi River (PBA). By application of the phytoplankton functional group (C strategists, competitive species; S strategists, stress-tolerant species; R strategists, rapid propagation species), seasonal changes in phytoplankton relative to environmental variations were evaluated using ordination analysis. Seasonal patterns of phytoplankton dynamics were detected during this study, with CS/S strategists causing algal blooms from mid-spring to early summer, CS/CR strategists often observed during flood season, and CS strategists dominant during mid-autumn. CR/R groups dominated during winter and caused algal blooms in February. Our results indicated that phytoplankton assemblages were directly related to reservoir operation effects. Generally, the TGD had a low water level during flood season, resulting in a relatively short hydraulic retention time and intensive variability, which supported the cooccurrence of CS and CR species. During the winter drought season, water storage in the TGD increased the water level and the hydraulic retention time in the PBA, enabling R/CR strategists to overcome the sedimentation effect and to out-compete S/CS species in winter. As expected, these diversity patterns were significantly correlated with the hydraulic retention time and nutrient limitation pattern in the PBA. This study provides strategic insight for evaluating the impacts of reservoir operations on phytoplankton adaptation.
24 CFR 203.43 - Eligibility of miscellaneous type mortgages.
Code of Federal Regulations, 2011 CFR
2011-04-01
... Department of the Interior located within the town area of Coulee Dam, WA, acquired by the United States for the construction, operation, and maintenance of Grand Coulee Dam and its appurtenant works or of any... be located on the mortgaged property a dwelling unit designed principally for residential use for not...
The report describes the results of pollution prevention opportunity assessments conducted at a representative U.S. Army Corps of Engineers civil works dam and hydroelectric power plant. ecommended methods for reducing pollution resulting primarily from the operation of these fac...
2011-05-01
operations, and soil properties. Key findings of this study indicate that soils within the study reach are conductive, with groundwater responding...16 3 Develop Detailed Map of Soils and Their Properties in Bosque Adjacent to...27 4 Evaluate Ecological Impact of River Levels, Soil Types, and Dam
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-01
... area relocations, and other alternative features; water operations-related effects within the reservoir... Sacramento-San Joaquin Delta watershed system by modifying the existing Shasta Dam and Reservoir to meet... enlarging Shasta Dam and Reservoir. Related legislation includes Title 34 of Public Law 102-575 (the Central...
78 FR 66911 - Notice of Availability of Draft Environmental Assessment; City of New York
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-07
... City of New York's existing Cannonsville Dam, which impounds its Cannonsville Water Supply Reservoir. The dam and reservoir are located on the West Branch of the Delaware River, near the Township of... EA) which analyzes the potential environmental effects of construction and operation of the project...
Korman, Josh; Melis, Theodore S.
2011-01-01
The Lees Ferry reach of the Colorado River-a 16-mile segment from Glen Canyon Dam to the confluence with the Paria River-supports an important recreational rainbow trout (Oncorhynchus mykiss) fishery. In Grand Canyon, nonnative rainbow trout prey on and compete for habitat and food with native fish, such as the endangered humpback chub (Gila cypha). Experimental flow fluctuations from the dam during winter and spring 2003-5 dewatered and killed a high proportion of rainbow trout eggs in gravel spawning bars, but this mortality had no measurable effect on the abundance of juvenile fish. Flow fluctuations during summer months reduced growth of juvenile trout relative to steadier flows. A high-flow experiment in March 2008 increased both trout survival rates for early life stages and fish abundance. These findings demonstrate that Glen Canyon Dam operations directly affect the trout population in the Lees Ferry reach and could be used to regulate nonnative fish abundance to limit potential negative effects of trout on native fish in Grand Canyon.
1981-06-01
SAutomatic . Manual I . Operative Yes I , No Co~ents: All controls operable per Water Departxent oersonnel. I Drawdown present Yes I , No Operative Yes_ , No... controls a 6-inch valve for dewatering the raw water wet well. One raw water supply gate was fully opened; the other opened 1-inch, and the 24-inch outlet...development). ,B- I B-2 w J---.-.z-- OtL ’S: OT7LET CONTROLS AND DRADMN Westerly end of dam - conc. overflow D.I. sluiceway No. Location and T7pe:I2
Deformation Monitoring and Bathymetry Analyses in Rock-Fill Dams, a Case Study at Ataturk Dam
NASA Astrophysics Data System (ADS)
Kalkan, Y.; Bilgi, S.
2014-12-01
Turkey has 595 dams constructed between 1936 and 2013 for the purposes of irrigation, flood control, hydroelectric energy and drinking water. A major portion of the dam basins in Turkey are deprived of vegetation and have slope topography on near surrounding area. However, landscaping covered with forest around the dam basin is desirable for erosion control. In fact; the dams, have basins deprived of vegetation, fill up quickly due to sediment transport. Erosion control and forestation are important factors, reducing the sediment, to protect the water basins of the dams and increase the functioning life of the dams. The functioning life of dams is as important as the investment and construction. Nevertheless, in order to provide safety of human life living around, well planned monitoring is essential for dams. Dams are very large and critical structures and they demand the use or application of precise measuring systems. Some basic physical data are very important for assessing the safety and performance of dams. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. Monitoring is an essential component of the dam after construction and during operation and must enable the timely detection of any behavior that could deteriorate the dam, potentially result in its shutdown or failure. Considering the time and labor consumed by long-term measurements, processing and analysis of measured data, importance of the small structural motions at regular intervals could be comprehended. This study provides some information, safety and the techniques about the deformation monitoring of the dams, dam safety and related analysis. The case study is the deformation measurements of Atatürk Dam in Turkey which is the 6th largest dam of world considering the filling volume of embankment. Brief information is given about the dam and the methods of monitoring techniques applied by various disciplines. Some results have been obtained from this method for nearly eight years are presented in this work. In addition, the results of bathymetric surveys between 2005 and 2010 will be compared using the cross sections where the maximum changes occurred on the dam bottom of the reservoir area.
1978-12-01
Audrain Stream : Unnamed Tributary of North Fork of Salt River Date of Inspection: September 29 and 30, 1978 Missouri Power and Light Dam No. Mo.10065...for a power plant, and the reser- voir is also used for recreation. The only operating facility at the darnsite is the pump station adjacent to the...identify due to heavy vegetation. 3. Generally unstable rock wall protecting the up- stream slope. 4. Extensive rodent activity throughout the embankment
1981-08-01
Design 6 2.2 Construction 6 2.3 Operation 6 2.4 Geology 6 2.5 Evaluation 6 SECTION 3 - VISUAL INSPECTION 3.1 Findings 7 3.2 Evaluation 9 SECTION 4...Downstream of Dam 9 Erosion Behind East Wingwall 10 Erosion and Debris Behind West Wingwall 11 Diagonal Crack in East Wingwall 12 West Wingwall...2.0 H to approximately 1.0 V on 6.0 H. (6) Zoning - Unknown. (7) Impervious core - Unknown. (8) Cutoff - Unknown. ( 9 ) Grout curtain - Unknown. h
Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2011
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.
This report presents survival, behavioral, and fish passage results for tagged yearling Chinook salmon and juvenile steelhead as part of a survival study conducted at John Day Dam during spring 2011. This study was designed to evaluate the passage and survival of yearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a paired-release survival model.
NASA Astrophysics Data System (ADS)
Roy, S. G.; Gold, A.; Uchida, E.; McGreavy, B.; Smith, S. M.; Wilson, K.; Blachly, B.; Newcomb, A.; Hart, D.; Gardner, K.
2017-12-01
Dam removal has become a cornerstone of environmental restoration practice in the United States. One outcome of dam removal that has received positive attention is restored access to historic habitat for sea-run fisheries, providing a crucial gain in ecosystem resilience. But dams also provide stakeholders with valuable services, and uncertain socio-ecological outcomes can arise if there is not careful consideration of the basin scale trade offs caused by dam removal. In addition to fisheries, dam removals can significantly affect landscape nutrient flux, municipal water storage, recreational use of lakes and rivers, property values, hydroelectricity generation, the cultural meaning of dams, and many other river-based ecosystem services. We use a production possibility frontiers approach to explore dam decision scenarios and opportunities for trading between ecosystem services that are positively or negatively affected by dam removal in New England. Scenarios that provide efficient trade off potentials are identified using a multiobjective genetic algorithm. Our results suggest that for many river systems, there is a significant potential to increase the value of fisheries and other ecosystem services with minimal dam removals, and further increases are possible by including decisions related to dam operations and physical modifications. Run-of-river dams located near the head of tide are often found to be optimal for removal due to low hydroelectric capacity and high impact on fisheries. Conversely, dams with large impoundments near a river's headwaters can be less optimal for dam removal because their value as nitrogen sinks often outweighs the potential value for fisheries. Hydropower capacity is negatively impacted by dam removal but there are opportunities to meet or exceed lost capacity by upgrading preserved hydropower dams. Improving fish passage facilities for dams that are critical for safety or water storage can also reduce impacts on fisheries. Our method is helpful for identifying efficient decision scenarios, but finding the optimal decision requires a deep and mutual understanding of stakeholder preferences. We outline how to interpret these preferences, identify overlaps with the efficient decision scenarios, and estimate the monetary budget required to act on these decisions.
NASA Astrophysics Data System (ADS)
Nikitina, Oxana I.; Bazarov, Kirill Y.; Egidarev, Evgeny G.
2018-06-01
The large Zeya hydropower dam is located on the Zeya River, the largest left-bank tributary of the Amur-Heilong River in Russia. The dam had been constructed by 1980 and its operation has significantly transformed the flow regime of the Zeya River. The flow regulation has reduced the magnitude of periodic flooding of the floodplain areas located downstream from the Zeya dam and disrupted habitats of flora and fauna. An estimation of the transformation of the freshwater ecosystems is required to develop measures necessary either to maintain or restore disrupted ecosystems. Application of remote sensing methods allows measuring characteristics of the ecosystem's components. Two sections of a floodplain below the Zeya dam were considered for analysis in order to detect changes in objects at each site during the comparison of remote data from 1969/1971 and 2016.
Melis, Theodore S.; Grams, Paul E.; Kennedy, Theodore A.; Ralston, Barbara E.; Robinson, Christopher T.; Schmidt, John C.; Schmit, Lara M.; Valdez, Richard A.; Wright, Scott A.
2011-01-01
Three high-flow experiments (HFEs) were conducted by the U.S. Department of the Interior at Glen Canyon Dam, Arizona, in March 1996, November 2004, and March 2008. Also known as artificial or controlled floods, these scheduled releases of water above the dam's powerplant capacity were designed to mimic pre-dam seasonal flooding on the Colorado River. The goal of the HFEs was to determine whether high flows could be used to benefit important downstream resources in Glen Canyon National Recreation Area and Grand Canyon National Park that have been affected by the existence and operation of Glen Canyon Dam. These downstream resources include native fish, particularly endangered humpback chub (Gila cypha), terrestrial and aquatic sandbar habitats, cultural sites, and recreational resources. This Fact Sheet summarizes HFE-related studies published since 1996 and outlines a possible strategy for implementing future HFEs.
Konrad, Christopher P.
2010-01-01
The Nature Conservancy has been working with U.S. Army Corps of Engineers (Corps) through the Sustainable Rivers Project (SRP) to modify operations of dams to achieve ecological objectives in addition to meeting the authorized purposes of the dams. Modifications to dam operations are specified in terms of environmental flow prescriptions that quantify the magnitude, duration, frequency, and seasonal timing of releases to achieve specific ecological outcomes. Outcomes of environmental flow prescriptions implemented from 2002 to 2008 have been monitored and evaluated at demonstration sites in five rivers: Green River, Kentucky; Savannah River, Georgia/South Carolina; Bill Williams River, Arizona; Big Cypress Creek, Texas; and Middle Fork Willamette River, Oregon. Monitoring and evaluation have been accomplished through collaborative partnerships of federal and state agencies, universities, and nongovernmental organizations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harnish, Ryan A.; Colotelo, Alison H. A.; Li, Xinya
2015-03-31
In 2012 and 2013, Pacific Northwest National Laboratory (PNNL) conducted a study that summarized the passage route proportions and route-specific survival rates of steelhead kelts that passed through Federal Columbia River Power System (FCRPS) dams. To accomplish this, a total of 811 steelhead kelts were tagged with Juvenile Salmon Acoustic Telemetry System (JSATS) transmitters. Acoustic receivers, both autonomous and cabled, were deployed throughout the FCRPS to monitor the downstream movements of tagged kelts. Kelts were also tagged with passive integrated transponder tags to monitor passage through juvenile bypass systems (JBS) and detect returning fish. The current study evaluated data collectedmore » in 2012 and 2013 to identify environmental, temporal, operational, individual, and behavioral variables that were related to forebay residence time, route of passage, and survival of steelhead kelts at FCRPS dams on the Snake River. Multiple approaches, including 3-D tracking, bivariate and multivariable regression modeling, and decision tree analyses were used to identify the environmental, temporal, operational, individual, and behavioral variables that had the greatest effect on forebay residence time, route of passage, and route-specific and overall dam passage survival probabilities for tagged kelts at Lower Granite (LGR), Little Goose (LGS), and Lower Monumental (LMN) dams. In general, kelt behavior and discharge appeared to work independently to affect forebay residence times. Kelt behavior, primarily approach location, migration depth, and “searching” activities in the forebay, was found to have the greatest influence on their route of passage. The condition of kelts was the single most important factor affecting their survival. The information gathered in this study may be used by dam operators and fisheries managers to identify potential management actions to improve in-river survival of kelts or collection methods for kelt reconditioning programs to aid the recovery of Snake River steelhead populations.« less
How to meet the increasing demands of water, food and energy in the future?
NASA Astrophysics Data System (ADS)
Shi, Haiyun; Chen, Ji; Sivakumar, Bellie; Peart, Mervyn
2017-04-01
Regarded as a driving force in water, food and energy demands, the world's population has been increasing rapidly since the beginning of the 20th century. According to the medium-growth projection scenario of the United Nations, the world's population will reach 9.5 billion by 2050. In response to the continuously growing population during this century, water, food and energy demands have also been increasing rapidly, and social problems (e.g., water, food, and energy shortages) will be most likely to occur, especially if no proper management strategies are adopted. Then, how to meet the increasing demands of water, food and energy in the future? This study focuses on the sustainable developments of population, water, food, energy and dams, and the significances of this study can be concluded as follows: First, we reveal the close association between dams and social development through analysing the related data for the period 1960-2010, and argue that construction of additional large dams will have to be considered as one of the best available options to meet the increasing water, food and energy demands in the future. We conduct the projections of global water, food and energy consumptions and dam development for the period 2010-2050, and the results show that, compared to 2010, the total water, food and energy consumptions in 2050 will increase by 20%, 34% and 37%, respectively. Moreover, it is projected that additional 4,340 dams will be constructed by 2050 all over the world. Second, we analyse the current situation of global water scarcity based on the related data representing water resources availability (per capita available water resources), dam development (the number of dams), and the level of economic development (per capita gross domestic product). At the global scale, water scarcity exists in more than 70% of the countries around the world, including 43 countries suffering from economic water scarcity and 129 countries suffering from physical water scarcity. At the continental scale, most countries of Africa, the south and west Asia, and the central Europe are suffering from water scarcity. Third, with comprehensive consideration of population growth as the major driving force, water resources availability as the basic supporting factor, and topography as the important constraint, we address the question of future dam development and predict the locations of future large dams around the world. The results show that there will be 1,433 large dams built in the future, mainly in the Tibet Plateau and the Yunnan-Guizhou Plateau in Asia, the East African Plateau and the western part of Africa, the Andes Mountains and the Brazilian Plateau region in South America, the Rocky Mountains in North America, the Alps in Europe, and the Murray-Darling Basin in Oceania. Taking into account of the current situation of global water scarcity, these large dams are most likely to be constructed in countries that have abundant total available water resources or per capita available water resources, no matter whether they are experiencing "economic water scarcity" or have sufficient financial support.
Ten years of the Three Gorges Dam: a call for policy overhaul
NASA Astrophysics Data System (ADS)
Yang, Xiankun; Lu, X. X.
2013-12-01
The Three Gorges Dam (TGD), the world’s largest source of ‘clean’ hydroelectric power (Shen and Xie 2004), has entered its tenth year after the first turbine went into operation in June 2003. The dam, with a generating capacity 20 times that of the United States’ Hoover Dam, has been hailed as a crucial part of a solution to China’s energy crisis. Despite great benefits, however, major concerns have been voiced over the disastrous environmental and social consequences of this massive engineering project (Stone 2011). In this paper, we review the benefits and impacts learned from the controversial megadam over the past decade and discuss perspective quests on policy overhaul for future environmental protection.
NASA Astrophysics Data System (ADS)
Hijazzi, Norshamirra; Thiruchelvam, Sivadass; Sabri Muda, Rahsidi; Nasharuddin Mustapha, Kamal; Che Muda, Zakaria; Ghazali, Azrul; Kamal Kadir, Ahmad; Hakimie, Hazlinda; Sahari, Khairul Salleh Mohamed; Hasini, Hasril; Mohd Sidek, Lariyah; Itam, Zarina; Fadhli Mohamad, Mohd; Razad, Azwin Zailti Abdul
2016-03-01
Dams, however significant their contributions are to the society, are not immune to failures and diminishing lifespan not unlike other structural elements in our infrastructure. Despite continuing efforts on design, construction, operation, and maintenance of dams to improve the safety of the dams, the possibility of unforeseen events of dam failures is still possible. Seeing that dams are usually integrated into close approximities with the community, dam failures may consequent in tremendous loss of lives and properties. The aims of formulation of Integrated Community Based Disaster Management (ICBDM) is to simulate evacuation modelling and emergency planning in order to minimize loss of life and property damages in the event of a dam-related disaster. To achieve the aim above, five main pillars have been identified for the formulation of ICBDM. A series of well-defined program inclusive of hydrological 2-D modelling, life safety modelling, community based EWS and CBTAP will be conducted. Finally, multiple parties’ engagement is to be carried out in the form of table top exercise to measure the readiness of emergency plans and response capabilities of key players during the state of a crisis.
Vanderkooi, Scott P.; Kennedy, Theodore A.; Topping, David J.; Grams, Paul E.; Ward, David L.; Fairley, Helen C.; Bair, Lucas S.; Sankey, Joel B.; Yackulic, Charles B.; Schmidt, John C.
2017-01-18
IntroductionThe purpose of this document is to describe a strategy by which monitoring and research data in the natural and social sciences will be collected, analyzed, and provided to the U.S. Department of the Interior (DOI), its bureaus, and to the Glen Canyon Dam Adaptive Management Program (GCDAMP) in support of implementation of the Glen Canyon Dam Long-Term Experimental and Management Plan (LTEMP) (U.S. Department of the Interior, 2016a). The selected alternative identified in the LTEMP Record of Decision (ROD) (U.S. Department of the Interior, 2016b) describes various data collection, analysis, modeling, and interpretation efforts to be conducted by the U.S. Geological Survey’s (USGS) Grand Canyon Monitoring and Research Center (GCMRC), partner agencies, and cooperators that will inform decisions about operations of Glen Canyon Dam and management of downstream resources between 2017 and 2037, the performance period of the LTEMP. General data collection, analysis, modeling, and interpretation activities are described in this science plan, whereas specific monitoring and research activities and detailed study plans are to be described in the GCDAMP’s triennial work plans (TWPs) to be developed by the Bureau of Reclamation and GCMRC with input from partner agencies and cooperators during the LTEMP period, which are to be reviewed and recommended by the GCDAMP and approved by the Secretary of the Interior. The GCDAMP consists of several components, the primary committee being the Adaptive Management Work Group (AMWG). This Federal advisory committee is composed of 25 agencies and stakeholder groups and is chaired by the Secretary of the Interior’s designee. The AMWG makes recommendations to the Secretary of the Interior concerning operations of Glen Canyon Dam and other experimental management actions that are intended to fulfill some obligations of the Grand Canyon Protection Act of 1992. The Technical Work Group (TWG) is a subcommittee of the AMWG and provides technical advice to the AMWG. It is composed of technical and science representatives from the same agencies and stakeholder groups who serve on the AMWG. GCMRC is the primary science provider to the GCDAMP and also coordinates many aspects of the science performed by cooperators and partner agencies. The Science Advisors Program provides independent science reviews and advice at the request of the GCDAMP.The plan proposed here necessarily depends on (1) the protocol for decision-making and the requirements for scientific data reporting described in the LTEMP ROD, (2) the priorities of the GCDAMP as directed by the LTEMP ROD (see Department of the Interior, 2016b, section 6.1), (3) the priorities for monitoring and research in the conservation measures section of the Biological Opinion for the LTEMP (U.S. Department of the Interior, 2016b, LTEMP ROD attachment E), (4) the priorities for resource management and information needs established by Federal and State resource-management agencies within the GCDAMP, (5) scientific understanding about the linkage between the status of those resources and operations of Glen Canyon Dam, and (6) the need to resolve existing scientific uncertainties about the linkage between dam operations and the condition of resources. We note that resource-management prioritization is fundamentally a policy decision charged specifically to DOI for the Colorado River in Glen and Grand Canyons, as outlined most recently in the LTEMP ROD, and is not the responsibility of the GCMRC. However, it is the responsibility of the GCMRC to describe the nature of scientific understanding, the nature of scientific uncertainty, and the risk of making resourcemanagement decisions in the face of existing scientific uncertainty. The goals of science activities in the next 20 years are to inform operational decisions regarding Glen Canyon Dam operations described in the LTEMP ROD, resolve remaining scientific uncertainties, and to monitor resource trends that are affected entirely, or in part, by dam operations.
NASA Astrophysics Data System (ADS)
Niayifar, A.; Perona, P.
2015-12-01
River impoundment by dams is known to strongly affect the natural flow regime and in turn the river attributes and the related ecosystem biodiversity. Making hydropower sustainable implies to seek for innovative operational policies able to generate dynamic environmental flows while maintaining economic efficiency. For dammed systems, we build the ecological and economical efficiency plot for non-proportional flow redistribution operational rules compared to minimal flow operational. As for the case of small hydropower plants (e.g., see the companion paper by Gorla et al., this session), we use a four parameters Fermi-Dirac statistical distribution to mathematically formulate non-proportional redistribution rules. These rules allocate a fraction of water to the riverine environment depending on current reservoir inflows and storage. Riverine ecological benefits associated to dynamic environmental flows are computed by integrating the Weighted Usable Area (WUA) for fishes with Richter's hydrological indicators. Then, we apply nondominated sorting genetic algorithm II (NSGA-II) to an ensemble of non-proportional and minimal flow redistribution rules in order to generate the Pareto frontier showing the system performances in the ecologic and economic space. This fast and elitist multiobjective optimization method is eventually applied to a case study. It is found that non-proportional dynamic flow releases ensure maximal power production on the one hand, while conciliating ecological sustainability on the other hand. Much of the improvement in the environmental indicator is seen to arise from a better use of the reservoir storage dynamics, which allows to capture, and laminate flood events while recovering part of them for energy production. In conclusion, adopting such new operational policies would unravel a spectrum of globally-efficient performances of the dammed system when compared with those resulting from policies based on constant minimum flow releases.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-24
... Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship Canal... enforcement of regulation. SUMMARY: The Coast Guard will enforce a segment of the Safety Zone; Brandon Road....S. Army Corps of Engineers' dispersal barrier maintenance operations. During the enforcement period...
77 FR 9265 - Glen Canyon Dam Adaptive Management Work Group
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-16
... (AMP) was implemented as a result of the Record of Decision on the Operation of Glen Canyon Dam Final.... L. 102-575) of 1992. The AMP includes a Federal advisory committee, the AMWG, a technical work group... administrative and resource issues pertaining to the AMP. To view a copy of the agenda and documents related to...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-31
... reservoir; (2) a proposed eight-foot-high, twenty-two-foot-wide dam; (3) a twenty-inch diameter, 630-foot... water or water power from a government dam; or (4) if applicable, has involved or would involve any... capacity, or have otherwise significantly modified the project's pre-1935 design or operation. l. Locations...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-04
... dam; (3) a proposed 350-foot-long, 18-to-24-inch-diameter above-ground steel penstock, routed along a... government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that... significantly modified the project's pre-1935 design or operation. l. Locations of the Application: Copies of...
7. View of turbine pit at an exciter unit showing ...
7. View of turbine pit at an exciter unit showing servo-motor heads (foreground and background at left) with piston rods bolted to the operating ring of the turbine gate (foreground and background at center). View to northeast. - Holter Hydroelectric Facility, Dam & Power House, End of Holter Dam Road, Wolf Creek, Lewis and Clark County, MT
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-12
... Industrial Water Supply From the Buford Dam/Lake Lanier Project AGENCY: Department of the Army, U.S. Army... accommodate municipal and industrial water supply from the Buford Dam/Lake Lanier project. The Corps is... also consider, along with operations for all authorized purposes, an expanded range of water supply...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-06
... Experimental and Management Plan for the Operation of Glen Canyon Dam AGENCY: Bureau of Reclamation and... Interior (Secretary) Ken Salazar announced that the development of a Long-Term Experimental and Management... GCDAMP includes a Federal advisory committee known as the Glen Canyon Dam Adaptive Management Work Group...
33 CFR 208.22 - Twin Buttes Dam and Reservoir, Middle and South Concho Rivers, Tex.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the reservoir level; number of river outlet works gates in operation with their respective openings... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Twin Buttes Dam and Reservoir... and Reservoir, Middle and South Concho Rivers, Tex. The Bureau of Reclamation, or its designated agent...
33 CFR 208.22 - Twin Buttes Dam and Reservoir, Middle and South Concho Rivers, Tex.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the reservoir level; number of river outlet works gates in operation with their respective openings... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Twin Buttes Dam and Reservoir... and Reservoir, Middle and South Concho Rivers, Tex. The Bureau of Reclamation, or its designated agent...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-18
... reservoir for the Grand River Dam Authority's Markham Ferry Project No. 2183, for pumped storage operations.... Holway Reservoir (the upper reservoir), with a normal pool elevation between 850 feet and 865 feet National Geodetic Vertical Datum; (2) three rim dikes around the upper reservoir; (3) an 1,800-foot-long...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-07
...-0300 prior to processing through Lock and Dams within the RNA as follows: (i) Northbound vessels must... Navigation Area (RNA) on the Illinois River. This Temporary Final Rule stipulates operational requirements... Mile Marker 240.0 to Mile Marker 271.4. This RNA is necessary to protect the general public, vessels...
Rounds, Stewart A.; Buccola, Norman L.
2015-01-01
Water-quality models allow water resource professionals to examine conditions under an almost unlimited variety of potential future scenarios. The two-dimensional (longitudinal, vertical) water-quality model CE-QUAL-W2, version 3.7, was enhanced and augmented with new features to help dam operators and managers explore and optimize potential solutions for temperature management downstream of thermally stratified reservoirs. Such temperature management often is accomplished by blending releases from multiple dam outlets that access water of different temperatures at different depths. The modified blending algorithm in version 3.7 of CE-QUAL-W2 allows the user to specify a time-series of target release temperatures, designate from 2 to 10 floating or fixed-elevation outlets for blending, impose minimum and maximum head and flow constraints for any blended outlet, and set priority designations for each outlet that allow the model to choose which outlets to use and how to balance releases among them. The modified model was tested with a variety of examples and against a previously calibrated model of Detroit Lake on the North Santiam River in northwestern Oregon, and the results compared well. These updates to the blending algorithms will allow more complicated dam-operation scenarios to be evaluated somewhat automatically with the model, with decreased need for multiple model runs or preprocessing of model inputs to fully characterize the operational constraints.
Analysis of Causes of Uplift Anomalies in the Čierny Váh Subsoil
NASA Astrophysics Data System (ADS)
Bednárová, Emília; Grambličková, Danka; Škvarka, Juraj; Majerčák, Vlastimil; Slávik, Ivan
2017-12-01
The pumped storage hydropower plant of Čierny Váh was created by means of damming up the valley of the Čierny Váh River. The dam is 18.5 m high above terrain and 375 m long in the dam’s crest. Total capacity of the reservoir is 5.1 million m3. Complicated geological conditions in the subsoil of dam’s body - fractured dolomite with local occurrence of tectonic breccia and clays, with the occurrence of intense disturbances - called for the construction of the grouting curtain in the dam’s subsoil. Its depth is about 20 in the area of the riverine plain, and about 60 m in the areas of abutments. During foregoing operations of the structure, more than 30 years, local anomalies in the uplift development in the right abutment’s subsoil of the lower reservoir dam were recorded. Their abnormally high values on the downstream side of grouting curtain have become the subject of extensive discussion and a stimulus for its remediation. To ensure reliable operation of the hydraulic structure a comprehensive analysis of the impact of the long-term operation of the reservoir on the dam safety was carried out. This included an examination of the causes of anomalous development of uplifts using FEM numerical modelling. The paper presents obtained results from this analysis.
NASA Astrophysics Data System (ADS)
Salazar, Fernando; San-Mauro, Javier; Celigueta, Miguel Ángel; Oñate, Eugenio
2017-07-01
Dam bottom outlets play a vital role in dam operation and safety, as they allow controlling the water surface elevation below the spillway level. For partial openings, water flows under the gate lip at high velocity and drags the air downstream of the gate, which may cause damages due to cavitation and vibration. The convenience of installing air vents in dam bottom outlets is well known by practitioners. The design of this element depends basically on the maximum air flow through the air vent, which in turn is a function of the specific geometry and the boundary conditions. The intrinsic features of this phenomenon makes it hard to analyse either on site or in full scaled experimental facilities. As a consequence, empirical formulas are frequently employed, which offer a conservative estimate of the maximum air flow. In this work, the particle finite element method was used to model the air-water interaction in Susqueda Dam bottom outlet, with different gate openings. Specific enhancements of the formulation were developed to consider air-water interaction. The results were analysed as compared to the conventional design criteria and to information gathered on site during the gate operation tests. This analysis suggests that numerical modelling with the PFEM can be helpful for the design of this kind of hydraulic works.
Survival and migration behavior of juvenile salmonids at McNary Dam, 2004, Final report of research
Perry, Russell W.; Braatz, Amy C.; Fielding, Scott D.; Lucchesi, Joel N.; Plumb, John M.; Adams, Noah S.; Rondorf, Dennis W.
2005-01-01
During 2004, the USGS Columbia River Research Laboratory conducted a study at McNary Dam using radio telemetry to estimate passage and survival parameters of juvenile salmonids. Our primary objective was to estimate these parameters under ambient environmental and operational conditions, and thus project-wide treatments were not implemented. The primary dam operation consisted of “biop” spill, where spill occurred at night between 1800 and 0600 hours, and no spill occurred between 0600 and 1800 hours for the majority of our study period. During the spring study period, we radio-tagged and released 1,896 yearling Chinook salmon and 1,888 juvenile steelhead. During the summer study period, we radio-tagged and released 1,919 subyearling Chinook salmon. All fish were tagged using gastric techniques to implant transmitters weighing 1.58 g for yearling Chinook salmon, 1.93 g for juvenile steelhead, and 0.96 g for subyearling Chinook salmon. Minimum fish sizes were based on a 6.5% tag:fish weight ratio, and the size of tagged fish represented about 91%, 100%, and 17% of the population, respectively for yearling Chinook salmon, juvenile steelhead, and subyearling Chinook salmon. About 60% of radio-tagged fish were released 10 km upstream of McNary Dam at Hat Rock State Park, Oregon, with the remainder released as control groups 400 m downstream of the dam.
Global sensitivity analysis of water age and temperature for informing salmonid disease management
NASA Astrophysics Data System (ADS)
Javaheri, Amir; Babbar-Sebens, Meghna; Alexander, Julie; Bartholomew, Jerri; Hallett, Sascha
2018-06-01
Many rivers in the Pacific Northwest region of North America are anthropogenically manipulated via dam operations, leading to system-wide impacts on hydrodynamic conditions and aquatic communities. Understanding how dam operations alter abiotic and biotic variables is important for designing management actions. For example, in the Klamath River, dam outflows could be manipulated to alter water age and temperature to reduce risk of parasite infections in salmon by diluting or altering viability of parasite spores. However, sensitivity of water age and temperature to the riverine conditions such as bathymetry can affect outcomes from dam operations. To examine this issue in detail, we conducted a global sensitivity analysis of water age and temperature to a comprehensive set of hydraulics and meteorological parameters in the Klamath River, California, where management of salmonid disease is a high priority. We applied an analysis technique, which combined Latin-hypercube and one-at-a-time sampling methods, and included simulation runs with the hydrodynamic numerical model of the Lower Klamath. We found that flow rate and bottom roughness were the two most important parameters that influence water age. Water temperature was more sensitive to inflow temperature, air temperature, solar radiation, wind speed, flow rate, and wet bulb temperature respectively. Our results are relevant for managers because they provide a framework for predicting how water within 'high infection risk' sections of the river will respond to dam water (low infection risk) input. Moreover, these data will be useful for prioritizing the use of water age (dilution) versus temperature (spore viability) under certain contexts when considering flow manipulation as a method to reduce risk of infection and disease in Klamath River salmon.
Bayesian Models for Streamflow and River Network Reconstruction using Tree Rings
NASA Astrophysics Data System (ADS)
Ravindranath, A.; Devineni, N.
2016-12-01
Water systems face non-stationary, dynamically shifting risks due to shifting societal conditions and systematic long-term variations in climate manifesting as quasi-periodic behavior on multi-decadal time scales. Water systems are thus vulnerable to long periods of wet or dry hydroclimatic conditions. Streamflow is a major component of water systems and a primary means by which water is transported to serve ecosystems' and human needs. Thus, our concern is in understanding streamflow variability. Climate variability and impacts on water resources are crucial factors affecting streamflow, and multi-scale variability increases risk to water sustainability and systems. Dam operations are necessary for collecting water brought by streamflow while maintaining downstream ecological health. Rules governing dam operations are based on streamflow records that are woefully short compared to periods of systematic variation present in the climatic factors driving streamflow variability and non-stationarity. We use hierarchical Bayesian regression methods in order to reconstruct paleo-streamflow records for dams within a basin using paleoclimate proxies (e.g. tree rings) to guide the reconstructions. The riverine flow network for the entire basin is subsequently modeled hierarchically using feeder stream and tributary flows. This is a starting point in analyzing streamflow variability and risks to water systems, and developing a scientifically-informed dynamic risk management framework for formulating dam operations and water policies to best hedge such risks. We will apply this work to the Missouri and Delaware River Basins (DRB). Preliminary results of streamflow reconstructions for eight dams in the upper DRB using standard Gaussian regression with regional tree ring chronologies give streamflow records that now span two to two and a half centuries, and modestly smoothed versions of these reconstructed flows indicate physically-justifiable trends in the time series.
Lubejko, Matthew; Whitledge, Greg; Coulter, Alison A.; Brey, Marybeth; Oliver, Devon; Garvey, James E.
2017-01-01
Dams are a conservation threat because they function as barriers to native fish movement; however, they may prevent the spread of invasive species. Invasive bigheaded carps (Hypophthalmichthys spp.) threaten the Great Lakes ecosystem and are advancing towards Lake Michigan via the Illinois River. Navigation dams on the Illinois River may deter bigheaded carps' upstream movement. We investigated the permeability of the Starved Rock Lock and Dam (SRLD), the most downstream gated Illinois River dam, to bigheaded carps' migration by examining the timing of individuals approaching and passing through SRLD in relation to gate openness, tailwater elevation, and water temperature. Using acoustic telemetry of (N = ~104 per year) tagged fish, 13 upstream passages of bigheaded carps occurred through SRLD between 2013 and 2016. Eleven passages occurred through the dam gates and 2 through the lock chamber, indicating deterrents (e.g., CO2) placed in SRLD lock chamber may only limit passage of a small proportion of all fish passing through the lock-and-dam structure. Passages were documented only in 2013 and 2015. Most of the dam gate passages occurred during high water when gates were completely out of the water. Timing of bigheaded carps approaching SRLD was positively correlated with rising water temperature and high tailwater elevation, and all fish approached during late March through mid-September. Movement through dams is rare; modifying gate operations to reduce gate openness during late spring and summer could further reduce the permeability of gated dams such as SRLD to bigheaded carps, slowing their upstream advance.
Geomorphology and American dams: The scientific, social, and economic context
NASA Astrophysics Data System (ADS)
Graf, William L.
2005-10-01
American geomorphologic research related to dams is embedded in a complicated context of science, policy, economics, and culture. Research into the downstream effects of large dams has progressed to the point of theory-building, but generalization and theory-building are from this research because (1) it is highly focused on a few locations, (2) it concerns mostly very large dams rather than a representative sample of sizes, (3) the available record of effects is too short to inform us on long-term changes, (4) the reversibility of changes imposed by dam installation and operation is unknown, and (5) coordinated funding for the needed research is scarce. In the scientific context, present research is embedded in a history of geomorphology in government service, with indistinct boundaries between "basic and applied" research. The federal policy that most strongly influences present geomorphological investigations connected with dams is related to habitat for endangered species, because the biological aspects of ecosystems are directly dependent on the substrate formed by the sediments and landforms that are influenced by dams. The economic context for research includes large amounts of public funds for river restoration, along with substantial private investments in dams; and geomorphology is central to these expensive issues. The cultural context for research is highly contentious and dominated by advocacy procedures that include intense scrutiny of any geomorphologic research related to dams. Advocates are likely to use the products of geomorphological research to make cases for their own positions.
1980-02-01
discharge coefficient of C = 3.4 was used. 0 Orifice flow condition when the reservoir water surface sub- merges the inlet opening. * Broad crested weir flow...2.7 was used. The intake tower will operate as a weir , as a weir and an orifice, or as an orifice and a broad crested weir depending upon the...spillway C prior to overtopping the railroad embankment into the original dam pond. Flow over this low point was calculated as flow over a broad crested weir
Archaeological Investigations at Sites 45-OK-250 and 45-OK-4, Chief Joseph Dam Project, Washington.
1984-01-01
level behind Chief Joseph Dam. Systematic random sampling using I x I x ’ - 0.1-m collection units in 1 x 1, 1 x 2, or 2 x 2 m cel Is disclosed...ft to the operating pool . level behind Chief Joseph Dam. Systematic random sampling using 1 x 1 x 0.1-i collection units In 1 x 1, 1 x 2, or 2 x 2 m...contingencies under which data were collected , describe data collection and analysis, and organize and summarize data In a torm useful to the widest
1979-09-01
Suburban Rural,Farm___ ’.iod & and 20% Slope: s;teep 20 tied. 2Q% Slight 60%... ______ Fa.rks Nitial P-onlirg xea. 30 Acres; Ave. Depth 6’ lt priuzqt...dam failure? Yes I No .. Character Downstream Valley: Narrow x Wide _ Developed _ _ Rural 70Z Urban 30 , ’ Park Highway WW Railroad .3 k to life and...Location and Type:. Controls___, ’ype;_________________________ Aut~~c *.~n..l . Gperative Yes-___, No___ : W presen~t ’Ye X ,No . Operative Yes-, No___
1978-11-01
DIVISION, CORPS OF ENGINEERSWALTHAM, MASS 02154 NTIS GRA&n F NOVEMBER 1978 DTIC TAB Ŕ Justiftcati n r r D stributijon/ Availabilit -" os Dist jSpecial...flashboards removed and can pass the PMF outflow of 1530 cfs (750 csm) with the water level 0.6 ft.Ui below the top of the concrete core wall. Within... water treatment plant and responsible for the day-to-day operation of the dam. He represented the owner during this investigation. His address and
1981-02-01
losses for the PMF were estimated at an initial loss of 1.0 inch and a constant loss rate of 0.05 inches per hour thereafter. 5.5 Reservoir Regulation ...Pertinent dam and reservoir data are shown in Table 1.1, paragraph 1.3.3. Regulation of flow from the reservoir is primarily an automatic function...Normal flows are maintained by the crest of the spillway riser at elevation 60.0 feet M.S.L. Some flow regulation can be exercised by the operation of
1980-08-01
5. That the valve on the outlet pipe be maintained and operated at least once each year . 6. That the low area on the right side of the spillway be...EVALUATION OF FEATURES 12 SECTION 6 - STRUCTURAL STABILITY 6.1 EVALUATION OF STRUCTURAL STABILITY 14 SECTION 7 - ASSESSMENT AND RECOMMENDATIONS 7.1 DAM...Classification: High (Refer to Section 3.i.E.) E. Ownership: Ms. Lavanda L. Lyman, Executive Director Rolling Hill Girl Scout Council 733 Route 202
Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2010
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.
This report presents survival, behavioral, and fish passage results for yearling and subyearling Chinook salmon smolts and juvenile steelhead tagged with JSATS acoustic micro-transmitters as part of a survival study conducted at John Day Dam during 2010. This study was designed to evaluate the passage and survival of yearling and subyearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a single-release survival estimate model.
Field verification of reconstructed dam-break flood, Laurel Run, Pennsylvania
Chen, Cheng-lung; Armbruster, Jeffrey T.
1979-01-01
A one-dimensional dam-break flood routing model is verified by using observed data on the flash flood resulting from the failure of Laurel Run Reservoir Dam near Johnstown, Pennsylvania. The model has been developed on the basis of an explicit scheme of the characteristics method with specified time intervals. The model combines one of the characteristic equations with the Rankine-Hugoniot shock equations to trace the corresponding characteristic backward to the known state for solving the depth and velocity of flow at the wave front. The previous version of the model has called for a modification of the method of solution to overcome the computational difficulty at the narrow breach and at any geomorphological constraints where channel geometry changes rapidly. The large reduction in the computational inaccuracies and oscillations was achieved by introducing the actual "storage width" in the equation of continuity and the imaginary "conveyance width" in the equation of motion. Close agreement between observed and computed peak stages at several stations downstream of the dam strongly suggests the validity and applicability of the model. However, small numerical noise appearing in the computed stage and discharge hydrographs at the dam site as well as discrepancy of attenuated peaks in the discharge hydrographs indicate the need for further model improvement.
NASA Astrophysics Data System (ADS)
Dafny, Elad; Tawfeeq, Kochar Jamal; Ghabraie, Kazem
2015-10-01
Dam sites provide an outstanding opportunity to explore dynamic changes in the groundwater flow regime because of the high hydraulic gradient rapidly induced in their surroundings. This paper investigates the temporal changes of the hydraulic conductivities of the rocks and engineered structures via a thorough analysis of hydrological data collected at the Dokam Dam, Iraq, and a numerical model that simulates the Darcian component of the seepage. Analysis of the data indicates increased seepage with time and suggests that the hydraulic conductivity of the rocks increased as the conductivity of the grout curtain decreased. Conductivity changes on the order of 10-8 m/s, in a 20-yr period were quantified using the numerical analysis. It is postulated that the changes in hydraulic properties in the vicinity of Dokan Dam are due to suspension of fine materials, interbedded in small fissures in the rocks, and re-settlement of these materials along the curtain. Consequently, the importance of the grout curtain to minimize the downstream seepage, not only as a result of the conductivity contrast with the rocks, but also as a barrier to suspended clay sediments, is demonstrated. The numerical analysis also helped us to estimate the proportion of the disconnected karstic conduit flow to the overall flow.
Adult chinook salmon passage at Little Goose Dam in relation to spill operations
Jepson, M.A.; Caudill , C.C.; Clabough, T.S.; Peery, C.A.; Beeman, J.W.; Fielding, S.
2009-01-01
Spill patterns at Little Goose Dam in 2007 were modified in anticipation of a spillway weir installation intended to improve downstream passage of juvenile salmonids. However, in spill pattern was associated with reduced daily counts of adult salmon passing the dam. Consequently, the behaviors and upstream passage times of radio-tagged adult spring–summer Chinook salmon were evaluated in response to three spillway discharge patterns at Little Goose Dam during 2008. Simultaneously, tailrace conditions were characterized by monitoring the downstream paths of GPS-equipped drogues. Two of the spill treatments (i.e., Bulk and Alternate) were variations of patterns thought to mimic those produced if a spillway weir was installed. The third treatment (Uniform) was characterized by spilling similar volumes of water through most spillbays.
Sedimentation Survey of Lago Toa Vaca, Puerto Rico, June-July 2002
Soler-López, Luis R.
2004-01-01
The Lago Toa Vaca dam is located in the municipality of Villalba in southern Puerto Rico, and is owned and operated by the Puerto Rico Aqueduct and Sewer Authority. Construction was completed in 1972 as the first phase of a multi-purpose project that contemplated four possible diversions from other basins to mitigate the rapid storage capacity loss of Lago Guayabal, located immediately downstream of the Toa Vaca dam. The latter phases of the intra-basin diversions were cancelled, and currently, the reservoir receives runoff from only 56.8 square kilometers of its drainage area. Lago Toa Vaca reservoir when constructed was to be used for irrigation of croplands in the southern coastal plain. The reservoir had an original storage capacity of 68.94 million cubic meters. Sedimentation has reduced the storage capacity by only 7 percent between 1972 and 2002 to 64.08 million cubic meters. This represents a long-term sedimentation rate of about 162,000 cubic meters per year. Based on the 2002 sedimentation survey, Lago Toa Vaca has a sediment trapping efficiency of about 98 percent and a drainage area-normalized sedimentation rate of about 3,086 cubic meters per square kilometer per year between 1972 and 2002. At the current long-term sedimentation rate the reservoir would lose its storage capacity by the year 2400.
Melis, Theodore S.; Pine, William E.; Korman, Josh; Yard, Michael D.; Jain, Shaleen; Pulwarty, Roger S.; Miller, Kathleen; Hamlet, Alan F.; Kenney, Douglas S.; Redmond, Kelly T.
2016-01-01
Adaptive management of Glen Canyon Dam is improving downstream resources of the Colorado River in Glen Canyon National Recreation Area and Grand Canyon National Park. The Glen Canyon Dam Adaptive Management Program (AMP), a federal advisory committee of 25 members with diverse special interests tasked to advise the U.S. Department of the Interior), was established in 1997 in response to the 1992 Grand Canyon Protection Act. Adaptive management assumes that ecosystem responses to management policies are inherently complex and unpredictable, but that understanding and management can be improved through monitoring. Best known for its high-flow experiments intended to benefit physical and biological resources by simulating one aspect of pre-dam conditions—floods, the AMP promotes collaboration among tribal, recreation, hydropower, environmental, water and other natural resource management interests. Monitoring has shown that high flow experiments move limited new tributary sand inputs below the dam from the bottom of the Colorado River to shorelines; rebuilding eroded sandbars that support camping areas and other natural and cultural resources. Spring-timed high flows have also been shown to stimulate aquatic productivity by disturbing the river bed below the dam in Glen Canyon. Understanding about how nonnative tailwater rainbow trout (Oncorhynchus mykiss), and downstream endangered humpback chub (Gila cypha) respond to dam operations has also increased, but this learning has mostly posed “surprise” adaptation opportunities to managers. Since reoperation of the dam to Modified Low Fluctuating Flows in 1996, rainbow trout now benefit from more stable daily flows and high spring releases, but possibly at a risk to humpback chub and other native fishes downstream. In contrast, humpback chub have so far proven robust to all flows, and native fish have increased under the combination of warmer river temperatures associated with reduced storage in Lake Powell, and a system-wide reduction in trout from 2000-06, possibly due to several years of natural reproduction under limited food supply. Uncertainties about dam operations and ecosystem responses remain, including how native and nonnative fish will interact and respond to possible increased river temperatures under drier basin conditions. Ongoing assessment of operating policies by the AMP’s diverse stakeholders represents a major commitment to the river’s valued resources, while surprise learning opportunities can also help identify a resilient climate-change strategy for co-managing nonnative and endangered native fish, sandbar habitats and other river resources in a region with already complex and ever-increasing water demands.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-14
... dam; (3) a proposed 18-inch-diameter, 535-foot-long PVC penstock; (4) an existing 22-foot-long, 22... water or water power from a government dam; or (4) if applicable, has involved or would involve any... capacity, or have otherwise significantly modified the project's pre-1935 design or operation. l. Locations...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-14
... South Haiwee reservoir, near the town of Olancha, Inyo County, California. The project would affect... (Alternatives A and B) would consist of the existing South Haiwee dam. The dam has operations limited due to... the water level in the reservoir is limited to a maximum elevation of 3,742 feet msl. The applicant is...
Code of Federal Regulations, 2010 CFR
2010-07-01
... the dam until further orders: (b) Excepting as specially provided in this section the normal flow of... when the natural flow of the Mississippi River is falling or when such natural flow is less than..., such permit to state the period which such ponding may cover and the maximum variation in stage below...
Early vegetation development on an exposed reservoir: implications for dam removal.
Auble, Gregor T; Shafroth, Patrick B; Scott, Michael L; Roelle, James E
2007-06-01
The 4-year drawdown of Horsetooth Reservoir, Colorado, for dam maintenance, provides a case study analog of vegetation response on sediment that might be exposed from removal of a tall dam. Early vegetation recovery on the exposed reservoir bottom was a combination of (1) vegetation colonization on bare, moist substrates typical of riparian zones and reservoir sediment of shallow dams and (2) a shift in moisture status from mesic to the xeric conditions associated with the pre-impoundment upland position of most of the drawdown zone. Plant communities changed rapidly during the first four years of exposure, but were still substantially different from the background upland plant community. Predictions from the recruitment box model about the locations of Populus deltoides subsp. monilifera (plains cottonwood) seedlings relative to the water surface were qualitatively confirmed with respect to optimum locations. However, the extreme vertical range of water surface elevations produced cottonwood seed regeneration well outside the predicted limits of drawdown rate and height above late summer stage. The establishment and survival of cottonwood at high elevations and the differences between the upland plant community and the community that had developed after four years of exposure suggest that vegetation recovery following tall dam removal will follow a trajectory very different from a simple reversal of the response to dam construction, involving not only long time scales of establishment and growth of upland vegetation, but also possibly decades of persistence of legacy vegetation established during the reservoir to upland transition.
Early vegetation development on an exposed reservoir: Implications for dam removal
Auble, G.T.; Shafroth, P.B.; Scott, M.L.; Roelle, J.E.
2007-01-01
The 4-year drawdown of Horsetooth Reservoir, Colorado, for dam maintenance, provides a case study analog of vegetation response on sediment that might be exposed from removal of a tall dam. Early vegetation recovery on the exposed reservoir bottom was a combination of (1) vegetation colonization on bare, moist substrates typical of riparian zones and reservoir sediment of shallow dams and (2) a shift in moisture status from mesic to the xeric conditions associated with the pre-impoundment upland position of most of the drawdown zone. Plant communities changed rapidly during the first four years of exposure, but were still substantially different from the background upland plant community. Predictions from the recruitment box model about the locations of Populus deltoides subsp. monilifera (plains cottonwood) seedlings relative to the water surface were qualitatively confirmed with respect to optimum locations. However, the extreme vertical range of water surface elevations produced cottonwood seed regeneration well outside the predicted limits of drawdown rate and height above late summer stage. The establishment and survival of cottonwood at high elevations and the differences between the upland plant community and the community that had developed after four years of exposure suggest that vegetation recovery following tall dam removal will follow a trajectory very different from a simple reversal of the response to dam construction, involving not only long time scales of establishment and growth of upland vegetation, but also possibly decades of persistence of legacy vegetation established during the reservoir to upland transition. ?? 2007 Springer Science+Business Media, LLC.
Plumb, J.M.; Perry, R.W.; Adams, N.S.; Rondorf, D.W.
2006-01-01
We used radiotelemetry to monitor the migration behavior of juvenile hatchery and wild steelhead Oncorhynchus mykiss as they migrated through Lower Granite Reservoir and Dam on the lower Snake River, Washington. From 1996 to 2001, we surgically implanted radio transmitters in 1,540 hatchery steelhead and 1,346 wild steelhead. For analysis, we used the inverse Gaussian distribution to describe travel time distributions for cohorts (>50 fish) of juvenile steelhead as they migrated downriver. Mean travel rates were significantly related to reach- and discharge-specific water velocities. Also, mean travel rates near the dam were slower for a given range of water velocities than were mean travel rates through the reservoir, indicating that the presence of the dam caused delay to juvenile steelhead over and above the effect of water velocity. Hatchery steelhead took about twice as long as wild steelhead to pass the dam as a result of the higher proportions of hatchery steelhead traveling upriver from the dam. Because upriver travel and the resulting migration delay might decrease survival, it is possible that hatchery steelhead survive at lower rates than wild steelhead. Our analysis identified a discharge threshold (???2,400 m3/s) below which travel time and the percentage of fish traveling upriver from the dam increased rapidly, providing support for the use of minimum flow targets to mitigate for fish delay and possibly enhance juvenile steelhead survival.
Braulik, Gill T.; Arshad, Masood; Noureen, Uzma; Northridge, Simon P.
2014-01-01
Habitat fragmentation of freshwater ecosystems is increasing rapidly, however the understanding of extinction debt and species decline in riverine habitat fragments lags behind that in other ecosystems. The mighty rivers that drain the Himalaya - the Ganges, Brahmaputra, Indus, Mekong and Yangtze - are amongst the world’s most biodiverse freshwater ecosystems. Many hundreds of dams have been constructed, are under construction, or are planned on these rivers and large hydrological changes and losses of biodiversity have occurred and are expected to continue. This study examines the causes of range decline of the Indus dolphin, which inhabits one of the world’s most modified rivers, to demonstrate how we may expect other vertebrate populations to respond as planned dams and water developments come into operation. The historical range of the Indus dolphin has been fragmented into 17 river sections by diversion dams; dolphin sighting and interview surveys show that river dolphins have been extirpated from ten river sections, they persist in 6, and are of unknown status in one section. Seven potential factors influencing the temporal and spatial pattern of decline were considered in three regression model sets. Low dry-season river discharge, due to water abstraction at irrigation barrages, was the principal factor that explained the dolphin’s range decline, influencing 1) the spatial pattern of persistence, 2) the temporal pattern of subpopulation extirpation, and 3) the speed of extirpation after habitat fragmentation. Dolphins were more likely to persist in the core of the former range because water diversions are concentrated near the range periphery. Habitat fragmentation and degradation of the habitat were inextricably intertwined and in combination caused the catastrophic decline of the Indus dolphin. PMID:25029270
Braulik, Gill T; Arshad, Masood; Noureen, Uzma; Northridge, Simon P
2014-01-01
Habitat fragmentation of freshwater ecosystems is increasing rapidly, however the understanding of extinction debt and species decline in riverine habitat fragments lags behind that in other ecosystems. The mighty rivers that drain the Himalaya - the Ganges, Brahmaputra, Indus, Mekong and Yangtze - are amongst the world's most biodiverse freshwater ecosystems. Many hundreds of dams have been constructed, are under construction, or are planned on these rivers and large hydrological changes and losses of biodiversity have occurred and are expected to continue. This study examines the causes of range decline of the Indus dolphin, which inhabits one of the world's most modified rivers, to demonstrate how we may expect other vertebrate populations to respond as planned dams and water developments come into operation. The historical range of the Indus dolphin has been fragmented into 17 river sections by diversion dams; dolphin sighting and interview surveys show that river dolphins have been extirpated from ten river sections, they persist in 6, and are of unknown status in one section. Seven potential factors influencing the temporal and spatial pattern of decline were considered in three regression model sets. Low dry-season river discharge, due to water abstraction at irrigation barrages, was the principal factor that explained the dolphin's range decline, influencing 1) the spatial pattern of persistence, 2) the temporal pattern of subpopulation extirpation, and 3) the speed of extirpation after habitat fragmentation. Dolphins were more likely to persist in the core of the former range because water diversions are concentrated near the range periphery. Habitat fragmentation and degradation of the habitat were inextricably intertwined and in combination caused the catastrophic decline of the Indus dolphin.
Spatial distribution and temporal development of high-mountain lakes in western Austria
NASA Astrophysics Data System (ADS)
Merkl, Sarah; Emmer, Adam; Mergili, Martin
2015-04-01
Glacierized high-mountain environments are characterized by active morphodynamics, favouring the rapid appearance and disappearance of lakes. On the one hand, such lakes indicate high-mountain environmental changes such as the retreat of glaciers. On the other hand, they are sometimes susceptible to sudden drainage, leading to glacial lake outburst floods (GLOFs) putting the downstream population at risk. Whilst high-mountain lakes have been intensively studied in the Himalayas, the Pamir, the Andes or the Western Alps, this is not the case for the Eastern Alps. A particular research gap, which is attacked with the present work, concerns the western part of Austria. We consider a study area of approx. 6,140 km², covering the central Alps over most of the province of Tyrol and part of the province of Salzburg. All lakes ≥250 m² located higher than 2000 m asl are mapped from high-resolution Google Earth imagery and orthophotos. The lakes are organized into seven classes: (i) ice-dammed; near-glacial (ii) moraine-dammed and (iii) bedrock-dammed; (iv) moraine-dammed and (v) bedrock-dammed distant to the recent glaciers; (vi) landslide-dammed; (vii) anthropogenic. The temporal development of selected lakes is investigated in detail, using aerial photographs dating back to the 1950s. 1045 lakes are identified in the study area. Only eight lakes are ice-dammed (i). One third of all lakes is located in the immediate vicinity of recent glacier tongues, half of them impounded by moraine (ii), half of them by bedrock (iii). Two thirds of all lakes are impounded by features (either moraines or bedrock) shaped by LIA or Pleistocenic glaciers at some distance to the present glacier tongues (iv and v). Only one landslide-dammed lake (vi) is identified in the study area, whilst 21 lakes are of anthropogenic origin (vii). 72% of all lakes are found at 2250-2750 m asl whilst less than 2% are found above 3000 m asl. The ratio of rock-dammed lakes increases with increasing elevation at the cost of moraine-dammed lakes. Multi-temporal analysis of selected near-glacial lakes reveals cases where lakes have appeared as proglacial lakes, but lost contact to the glacier within few decades or even years, or have even been decoupled from the glacial water supply. This goes hand in hand with rapid changes of lake shape and size, with merging or separating of lakes, and with the disappearance of short-lived lakes or lake systems. Consequently, we distinguish three stages of lake development: (a) a pro-glacial, (b) a periglacial and (c) a non-glacial stage. The dynamics - and also the susceptibility of a lake to sudden drainage - decrease substantially from (a) to (c). Lakes in the stages (a) and (b) are less prominent in our study area, compared to other glacierized high-mountain regions, leading us to the conclusion that (1) the current threat to the population by GLOFs is lower but (2) the future development of emerging lakes has to be monitored carefully.
Feasibility of groundwater recharge dam projects in arid environments
NASA Astrophysics Data System (ADS)
Jaafar, H. H.
2014-05-01
A new method for determining feasibility and prioritizing investments for agricultural and domestic recharge dams in arid regions is developed and presented. The method is based on identifying the factors affecting the decision making process and evaluating these factors, followed by determining the indices in a GIS-aided environment. Evaluated parameters include results from field surveys and site visits, land cover and soils data, precipitation data, runoff data and modeling, number of beneficiaries, domestic irrigation demand, reservoir objectives, demography, reservoirs yield and reliability, dam structures, construction costs, and operation and maintenance costs. Results of a case study on more than eighty proposed dams indicate that assessment of reliability, annualized cost/demand satisfied and yield is crucial prior to investment decision making in arid areas. Irrigation demand is the major influencing parameter on yield and reliability of recharge dams, even when only 3 months of the demand were included. Reliability of the proposed reservoirs as related to their standardized size and net inflow was found to increase with increasing yield. High priority dams were less than 4% of the total, and less priority dams amounted to 23%, with the remaining found to be not feasible. The results of this methodology and its application has proved effective in guiding stakeholders for defining most favorable sites for preliminary and detailed design studies and commissioning.
NASA Astrophysics Data System (ADS)
Arias, M. E.; Farinosi, F.; Lee, E.; Livino, A.; Moorcroft, P. R.
2016-12-01
Brazil is the 2nd largest hydropower producer in the world, and this energy source will continue to be a priority in the country for the foreseeable decades. Yet, climate change is expected to alter the country's hydrological regime, in particular in the Amazon where most new hydropower development is occurring. In order to better assess the potential of hydropower projects in decades to come, it is important to evaluate how future hydrological regimes will affect their performance and suitability. This study quantifies the impacts of climate change and land use conversion on hydropower generation, and identifies mechanisms that could help energy planners to account for future changes. Using the largest network of dams in Brazil's national portfolio within a single watershed, the Tapaj's River, this study connects global and regional future environmental projections to daily river flows and operations of 37 dams with an overall potential capacity of 29.4 GW. We found that climate change could decrease hydropower potential by 477-665 MW (-6 to -8% from historical conditions) during the dry season, a critical loss since dams are expected to operate at only one third of capacity during this perioddue to the limited reservoir volume of most projects in the Amazon lowlands. Furthermore, deforestation is expected to increase the inter-annual variability in hydropower potential from 2,798 for baseline conditions to 3,764-3,899 (+967-1102) MW under future scenarios for the 2040s. Consideration of future hydrological conditions on individual dams showed that the magnitude and uncertainty of losses could be greater than 30 MW -equivalent to the total potential of some dams in the inventory- in 11 of the projects studied. Future hydrological conditions could also delay the period when maximum daily generation occurs by 22-29 days, which could have important implications to energy planning in Brazil because these run-of-river dams would no longer be able to meet the country's seasonal peak demand. This information on future changes to individual dams' performance could feed directly into the project selection process in order to adapt designs and operations to ensure the greatest benefits and least impacts from hydropower in the long term.
Status and Trends of Resources Below Glen Canyon Dam Update - 2009
Hamill, John F.
2009-01-01
The protection of resources found in Glen Canyon National Recreation Area and Grand Canyon National Park, Arizona, emerged as a significant public concern in the decades following the completion of Glen Canyon Dam in 1963. The dam, which lies about 15 miles upstream from the park, altered the Colorado River's flow, temperature, and sediment-carrying capacity, resulting over time in beach erosion, expansion of nonnative species, and losses of native fish. During the 1990s, in response to public concern, Congress and the Department of the Interior embarked on an ongoing effort to reduce and address the effects of dam operations on downstream resources. In 2005, the U.S. Geological Survey produced a comprehensive report entitled 'The State of the Colorado River Ecosystem in Grand Canyon', which documented the condition and trends of resources downstream of Glen Canyon Dam from 1991 to 2004. This fact sheet updates the 2005 report to extend its findings to include data published through April 2009 for key resources.
NASA Astrophysics Data System (ADS)
Farinha, Maria Luísa Braga; Azevedo, Nuno Monteiro; Candeias, Mariline
2017-02-01
The explicit formulation of a small displacement model for the coupled hydro-mechanical analysis of concrete gravity dam foundations based on joint finite elements is presented. The proposed coupled model requires a thorough pre-processing stage in order to ensure that the interaction between the various blocks which represent both the rock mass foundation and the dam is always edge to edge. The mechanical part of the model, though limited to small displacements, has the advantage of allowing an accurate representation of the stress distribution along the interfaces, such as rock mass joints. The hydraulic part and the mechanical part of the model are fully compatible. The coupled model is validated using a real case of a dam in operation, by comparison of the results with those obtained with a large displacement discrete model. It is shown that it is possible to assess the sliding stability of concrete gravity dams using small displacement models under both static and dynamic conditions.
NASA Astrophysics Data System (ADS)
Geeraert, Naomi; Ochieng Omengo, Fred; Tamooh, Fredrick; Paron, Paolo; Bouillon, Steven; Govers, Gerard
2014-05-01
The construction of sediment rating curves for monitoring stations is a widely used technique to budget sediment fluxes. Changes in the relationship between discharge and sediment concentrations over time are often attributed to human-induced changes in catchment characteristics, such as land use change, dam construction or soil conservation measures and many models have been developed to quantitatively link catchment characteristics and river sediment load. Conversely, changes in river sediment fluxes are often interpreted as indications of major changes in the catchment. By doing so, autogenic processes, taking place within the river channel, are overlooked despite the increasing awareness of their importance. We assessed the role of autogenic processes on the sediment load of Tana River (Kenya). The Tana river was impacted by major dam construction between 1968 and 1988, effectively blocking at least 80% of the sediment transfer from the highlands to the lower river reaches. However, a comparison of pre-dam sediment fluxes at Garissa (located 250 km downstream of the dams) with recent measurements shows that sediment fluxes have not changed significantly. This suggests that most of the sediment in the post-dam period has to originate from inside the alluvial plain of the river, as tributaries downstream of the dams are scarce and intermittent. Several observations are consistent with this hypothesis. We observed that, during the wet season, sediment concentrations rapidly increased below the dams and are not controlled by inputs from tributaries. Also, sediment concentrations were high at the beginning of the wet season, which can be attributed to channel adjustment to the higher discharges. The river sediment does not contain significant amounts of 137Cs or 210Pbxs, suggesting that sediments are not derived from topsoil erosion. Furthermore, we observed a counter clockwise hysteresis during individual events which can be explained by the fact that sediment mobilised within the river during a given event travels slower than the water. The highly dynamic behaviour of the river is further demonstrated by the rapid changes in river cross-section at Garissa and meander migration rates of several m y-1. In order to estimate a time frame for which changes in sediment inputs will be reflected in the sediment concentration at Garissa a single box model was developed. Results indicate that the effects of sediment blockage by the dams will only be visible after several hundreds to perhaps thousands of years. This clearly shows that autogenic processes are dominant in the lower Tana River and that, therefore, changes in sediment delivery cannot be detected in the sediment discharge record. More generally, understanding and interpreting the dynamics of such river systems requires that autogenic processes are correctly accounted for.
Adams, Noah S.; Plumb, John M.; Perry, Russell W.; Rondorf, Dennis W.
2014-01-01
An integral part of efforts to recover stocks of Pacific salmon Oncorhynchus spp. and steelhead O. mykiss in Pacific Northwest rivers is to increase passage efficacy and survival of juveniles past hydroelectric dams. As part of this effort, we evaluated the efficacy of a prototype surface bypass structure, the removable spillway weir (RSW), installed in a spillbay at Lower Granite Dam, Washington, on the Snake River during 2002, 2003, 2005, and 2006. Radio-tagged juvenile steelhead were released upstream from the dam and their route of passage through the turbines, juvenile bypass, spillway, or RSW was recorded. The RSW was operated in an on-or-off condition and passed 3–13% of the total discharge at the dam when it was on. Poisson rate models were fit to the passage counts of hatchery- and natural-origin juvenile steelhead to predict the probability of fish passing the dam. Main-effect predictor variables were RSW operation, diel period, day of the year, proportion of flow passed by the spillway, and total discharge at the dam. The combined fish passage through the RSW and spillway was 55–85% during the day and 37–61% during the night. The proportion of steelhead passing through nonturbine routes was <88% when the RSW was off during the day and increased to >95% when the RSW was on during the day. The ratio of the proportion of steelhead passed to the proportion of water passing the RSW was from 6.3:1 to 10.0:1 during the day and from 2.7:1 to 5.2:1 during the night. Steelhead passing through the RSW exited the tailrace about 15 min faster than fish passing through the spillway. Mark–recapture single-release survival estimates for steelhead passing the RSW ranged from 0.95 to 1.00. The RSW appeared to be an effective bypass structure compared with other routes of fish passage at the dam.
NASA Astrophysics Data System (ADS)
Cochrane, T. A.; Arias, M. E.; Oeurng, C.; Arnaiz, M.; Piman, T.
2016-12-01
The Tonle Sap Lake is Southeast Asia's most productive freshwater fishery, but the productivity of this valuable ecosystem is under threat from extensive development in the lower Mekong. With dams potentially blocking all major tributaries along the lower Mekong River, the role of local Tonle Sap basin tributaries for maintaining environmental flows, sediment loads, and fish recruitment is becoming increasingly critical. Development within the Tonle Sap basin, however, is not stagnant. Developers are proposing extensive dam development in key Tonle Sap tributaries (see Figure). Some dams will provide hydroelectricity and others will provide opportunities for large-scale irrigation resulting in agro-industrial expansion. There is thus an immediate need to assess the current situation and understand future effects of dam development and land use conversion under climate change on local riverine ecosystems. A combination of remote sensing, field visits, and hydro-meteorological data analyses enabled an assessment of water infrastructure and agricultural development in the basin. The application of SWAT for modelling flows and water quality combined with HEC-RESSIM for reservoir operations enabled for a holistic modelling approach. Initial results show that dams and land use change dominate flow and water quality responses, when compared to climate change. Large ongoing dam and irrigation development in the Pursat and Battambang subbasins will critically alter the natural river flows to the Tonle Sap Lake. Some of the observed dams did not have provisions for sediment flushing, clearing of flooded areas, fish passages, or other environmental protection measures. Poor planning and operation of this infrastructure could have dire consequences on the fragile riverine ecosystem of Tonle Sap tributaries, resulting in fish migration barriers, losses in aquatic habitats, and ecological degradation. The seemingly chaotic development in the Tonle Sap basin induces a great level of complexity in the prediction of future change in flows, sediment, and nutrients to the Tonle Sap, which needs to be overcome with improved data gathering through tools such as remote sensing. Timely interventions to the current development is needed in order to alleviate future environmental pressures.
Determining the effects of dams on subdaily variation in river flows at a whole-basin scale
Zimmerman, J.K.H.; Letcher, B.H.; Nislow, K.H.; Lutz, K.A.; Magilligan, F.J.
2010-01-01
River regulation can alter the frequency and magnitude of subdaily flow variations causing major impacts on ecological structure and function. We developed an approach to quantify subdaily flow variation for multiple sites across a large watershed to assess the potential impacts of different dam operations (flood control, run-of-river hydropower and peaking hydropower) on natural communities. We used hourly flow data over a 9-year period from 30 stream gages throughout the Connecticut River basin to calculate four metrics of subdaily flow variation and to compare sites downstream of dams with unregulated sites. Our objectives were to (1) determine the temporal scale of data needed to characterize subdaily variability; (2) compare the frequency of days with high subdaily flow variation downstream of dams and unregulated sites; (3) analyse the magnitude of subdaily variation at all sites and (4) identify individual sites that had subdaily variation significantly higher than unregulated locations. We found that estimates of flow variability based on daily mean flow data were not sufficient to characterize subdaily flow patterns. Alteration of subdaily flows was evident in the number of days natural ranges of variability were exceeded, rather than in the magnitude of subdaily variation, suggesting that all rivers may exhibit highly variable subdaily flows, but altered rivers exhibit this variability more frequently. Peaking hydropower facilities had the most highly altered subdaily flows; however, we observed significantly altered ranges of subdaily variability downstream of some flood-control and run-of-river hydropower dams. Our analysis can be used to identify situations where dam operating procedures could be modified to reduce the level of hydrologic alteration. ?? 2009 John Wiley & Sons, Ltd.
Wilson, G. Glenn; Ryder, Darren; Tekie, Habte; Petros, Beyene
2018-01-01
Background Water level management has been suggested as a potential tool to reduce malaria around large reservoirs. However, no field-based test has been conducted to assess the effect of water level management on mosquito larval abundance in African settings. The objective of the present study is to evaluate the effects of water level drawdown rates on mosquito larval abundance. Methods Twelve experimental dams were constructed on the foreshore of the Koka Dam in Ethiopia. These were grouped into four daily water drawdown treatments, each with three replicates: no water-level drawdown (Group 1; Control), 10 mm.d-1 (Group 2), 15 mm.d-1 (Group 3) and 20 mm.d-1 (Group 4). Larval sampling was conducted weekly for a period of 6 weeks each in the main malaria transmission season (October to November 2013) and subsequent dry season (February to March 2014). Larval densities were compared among treatments over time using repeated measures Analysis of Variance (ANOVA). Results A total of 284 Anopheles mosquito larvae were collected from the experimental dams during the study period. Most (63.4%; n = 180) were collected during the main malaria transmission season while the remaining (36.6%; n = 104) were collected during the dry season. Larvae comprised four Anopheles species, dominated by Anopheles arabiensis (48.1% of total larval samples; n = 136) and An. pharoensis (33.2%; n = 94). Mean larval density was highest in control treatment dams with stable water levels throughout the study, and decreased significantly (P < 0.05) with increasing water drawdown rates in both seasons. During the main transmission season, anopheline larval density was generally lower by 30%, 70% and 84% in Groups 2, Group 3 and Group 4, respectively, compared with the control dams (Group 1). In the dry season, larval density was reduced by 45%, 70% and 84% in Groups 2, Group 3 and Group 4, respectively, when compared to the control dams. Conclusion Increased water drawdown rates were associated with lower mosquito larval abundance. Water level management could thus serve as a potential control measure for malaria vectors around reservoirs by regulating the persistence of shallow shoreline breeding habitats. Dam operators and water resource managers should consider incorporating water level management as a malaria control mechanism into routine dam operations to manage the risk of malaria transmission to human populations around reservoirs. PMID:29672560
NASA Astrophysics Data System (ADS)
Foumelis, Michael
2017-01-01
The applicability of the normalized difference water index (NDWI) to the delineation of dam failure-induced floods is demonstrated for the case of the Sparmos dam (Larissa, Central Greece). The approach followed was based on the differentiation of NDWI maps to accurately define the extent of the inundated area over different time spans using multimission Earth observation optical data. Besides using Landsat data, for which the index was initially designed, higher spatial resolution data from Sentinel-2 mission were also successfully exploited. A geospatial analysis approach was then introduced to rapidly identify potentially affected segments of the road network. This allowed for further correlation to actual damages in the following damage assessment and remediation activities. The proposed combination of geographic information systems and remote sensing techniques can be easily implemented by local authorities and civil protection agencies for mapping and monitoring flood events.
8. VIEW OF INTERIOR OF OPERATING HOUSE. 'WORTHINGTON PUMP AND ...
8. VIEW OF INTERIOR OF OPERATING HOUSE. 'WORTHINGTON PUMP AND MACHINE COMPANY' PUMP AND MOTOR TO OPERATE GAMES - San Carlos Irrigation Project, Ashurst-Hayden Dam, Gila River, T4S R11E S7, Coolidge, Pinal County, AZ
78 FR 47695 - Sam Rayburn Dam Power Rate
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-06
... replacements in the hydroelectric generating facilities and small increases to annual operations and... K. McDonald, Vice President for Corporate Operations/Chief Operating Officer, Southwestern Power... Code of Federal Regulations (18 CFR 300). Southwestern markets power from 24 multi-purpose reservoir...
Kock, Tobias J.; Liedtke, Theresa L.; Rondorf, Dennis W.; Serl, John D.; Kohn, Mike; Bumbaco, Karin A.
2012-01-01
A 4-year evaluation was conducted to determine the proportion of juvenile coho salmon Oncorhynchus kisutch passing Cowlitz Falls Dam, on the Cowlitz River, Washington, during winter. River and reservoir populations of coho salmon parr were monitored using radiotelemetry to determine if streamflow increases resulted in increased downstream movement and dam passage. This was of interest because fish that pass downstream of Cowlitz Falls Dam become landlocked in Riffe Lake and are lost to the anadromous population. Higher proportions of reservoir-released fish (0.391-0.480) passed Cowlitz Falls Dam than did river-released fish (0.037-0.119). Event-time analyses demonstrated that streamflow increases were important predictors of dam passage rates during the study. The estimated effect of increasing streamflows on the risk of dam passage varied annually and ranged from 9% to 75% for every 28.3 m3/s increase in streamflow. These results have current management implications because they demonstrate the significance of dam passage by juvenile coho salmon during winter months when juvenile fish collection facilities are typically not operating. The results also have future management implications because climate change predictions suggest that peak streamflow timing for many watersheds in the Pacific Northwest will shift from late spring and early summer to winter. Increased occurrence of intense winter flood events is also expected. Our results demonstrate that juvenile coho salmon respond readily to streamflow increases and initiate downstream movements during winter months, which could result in increased passage at dams during these periods if climate change predictions are realized in the coming decades.
Hardiman, Jill M.; Counihan, Timothy D.; Burgess, Dave S.; Simmons, Katrina E.; Holmberg, Glen S.; Rogala, Josh; Polacek, Rochelle
2012-01-01
The U.S. Geological Survey (USGS) and the Washington Department of Fish and Wildlife (WDFW) have been working with the Public Utility District No. 2 of Grant County, Washington (Grant PUD), to increase their understanding of predator-prey interactions in the Priest Rapids Hydroelectric Project (PRP), Columbia River, Washington. For this study, the PRP is defined as the area approximately 6 kilometers upstream of Wanapum Dam to the Priest Rapids Dam tailrace, 397.1 miles from the mouth of the Columbia River. Past year’s low survival numbers of juvenile steelhead (Oncorhynchus mykiss) through Wanapum and Priest Rapids Dams has prompted Grant PUD, on behalf of the Priest Rapids Coordinating Committee, to focus research efforts on steelhead migration and potential causal mechanisms for low survival. Steelhead passage survival in 2009 was estimated at 0.944 through the Wanapum Development (dam and reservoir) and 0.881 through the Priest Rapids Development and for 2010, steelhead survival was 0.855 for Wanapum Development and 0.904 for Priest Rapids Development. The USGS and WDFW implemented field collection efforts in 2011 for northern pikeminnow (Ptychocheilus oregonensis), smallmouth bass (Micropterus dolomieu), and walleye (Sander vitreus, formerly Stizostedion vitreum) and their diets in the PRP. For predator indexing, we collected 948 northern pikeminnow, 237 smallmouth bass, 18 walleye, and two largemouth bass (Micropterus salmoides). The intent of this study was to provide standardized predation indices within individual reaches of the PRP to discern spatial variability in predation patterns. Furthermore, the results of the 2011 study were compared to results of a concurrent steelhead survival study. Our results do not indicate excessively high predation of Oncorhynchus spp. occurring by northern pikeminnow or smallmouth bass in any particular reach throughout the study area. Although we found Oncorhynchus spp. in the predator diets, the relative proportion was small. Predation index values in 2011 were highest in the Priest Rapids mid-reservoir reach for northern pikeminnow and smallmouth bass. Predation indices generally were high in the tailrace areas for northern pikeminnow, and high in the forebay areas for smallmouth bass. Steelhead survival in 2011 was consistently high throughout the study period and the PRP, although predation indices were relatively low, which suggests that fish predation did not significantly affect steelhead survival throughout the study area. Our efforts to correlate retrospective predation indices with survival estimates for 2009 and 2010 did provide some evidence for high predation occurring in some of the same reaches, which had low steelhead survival, such as the Priest Rapids tailrace in 2009. However, for 2010, our results indicated that the loss of salmonids to predation were more contradictory to the survival results, where predation indices were higher for reaches in the Priest Rapids Development than in the Wanapum Development. Establishing correlations between steelhead survival and observed predation indices for previous research years, in 2009 and 2010 was confounded by the lack of coordination of these two studies during the initial study design, implementation period for such an analysis. Future efforts to correlate steelhead survival with fish predation would benefit from efforts to better coordinate the studies with consistent study reaches, and better timing of concurrent efforts.
77 FR 50493 - Sam Rayburn Dam Project Power Rate
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-21
...-purpose reservoir projects with hydroelectric power facilities constructed and operated by the U.S. Army... Corporate Operations, Southwestern Power Administration, One West Third, Tulsa, OK 74103, (918) 595-6680 or...
Mutually beneficial and sustainable management of Ethiopian and Egyptian dams in the Nile Basin
NASA Astrophysics Data System (ADS)
Habteyes, Befekadu G.; Hasseen El-bardisy, Harb A. E.; Amer, Saud A.; Schneider, Verne R.; Ward, Frank A.
2015-10-01
Ongoing pressures from population growth, recurrent drought, climate, urbanization and industrialization in the Nile Basin raise the importance of finding viable measures to adapt to these stresses. Four tributaries of the Eastern Nile Basin contribute to supplies: the Blue Nile (56%), White Nile-Albert (14%), Atbara (15%) and Sobat (15%). Despite much peer reviewed work addressing conflicts on the Nile, none to date has quantitatively examined opportunities for discovering benefit sharing measures that could protect negative impacts on downstream water users resulting from new upstream water storage developments. The contribution of this paper is to examine the potential for mutually beneficial and sustainable benefit sharing measures from the development and operation of the Grand Ethiopian Renaissance Dam while protecting baseline flows to the downstream countries including flows into the Egyptian High Aswan Dam. An integrated approach is formulated to bring the hydrology, economics and institutions of the region into a unified framework for policy analysis. A dynamic optimization model is developed and applied to identify the opportunities for Pareto Improving measures to operate these two dams for the four Eastern Nile Basin countries: Ethiopia, South Sudan, Sudan, and Egypt. Results indicate a possibility for one country to be better off (Ethiopia) and no country to be worse off from a managed operation of these two storage facilities. Still, despite the optimism of our results, considerable diplomatic negotiation among the four riparians will be required to turn potential gains into actual welfare improvements.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-16
.... The proposed project will consist of a small 30-foot-high rock dam, a small reservoir, an 18- [[Page... United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable... pre-1935 design or operation. l. Locations of the Application: Copies of this filing are on file with...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-19
... 158-foot-long, 8- foot-high high-rock-laid dam with a small reservoir; (2) a 11-foot wide by 12.5-foot... reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4... modified the project's pre- 1935 design or operation. l. Locations of the Application: Copies of this...
Morphology of the Middle Rio Grande from Cochiti Dam to Bernalillo Bridge, New Mexico
Claudia Leon Salazar
1998-01-01
The continuous geomorphologic changes in the Middle Rio Grande in New Mexico have been of interest for many governmental agencies involved with the management and operation of this river system. Due to sedimentation problems along this river, highly developed plans for sediment detention and flood control have been carried out. Cochiti Dam was built as a part of these...
Total Dissolved Gas Monitoring in Chum Salmon Spawning Gravels Below Bonneville Dam
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arntzen, Evan V.; Geist, David R.; Panther, Jennifer L.
2007-01-30
At the request of the U.S. Army Corps of Engineers (Portland District), Pacific Northwest National Laboratory (PNNL) conducted research to determine whether total dissolved gas concentrations are elevated in chum salmon redds during spring spill operations at Bonneville Dam. The study involved monitoring the total dissolved gas levels at egg pocket depth and in the river at two chum salmon spawning locations downstream from Bonneville Dam. Dissolved atmospheric gas supersaturation generated by spill from Bonneville Dam may diminish survival of chum (Oncorhynchus keta) salmon when sac fry are still present in the gravel downstream from Bonneville Dam. However, no previousmore » work has been conducted to determine whether total dissolved gas (TDG) levels are elevated during spring spill operations within incubation habitats. The guidance used by hydropower system managers to provide protection for pre-emergent chum salmon fry has been to limit TDG to 105% after allowing for depth compensation. A previous literature review completed in early 2006 shows that TDG levels as low as 103% have been documented to cause mortality in sac fry. Our study measured TDG in the incubation environment to evaluate whether these levels were exceeded during spring spill operations. Total dissolved gas levels were measured within chum salmon spawning areas near Ives Island and Multnomah Falls on the Columbia River. Water quality sensors screened at egg pocket depth and to the river were installed at both sites. At each location, we also measured dissolved oxygen, temperature, specific conductance, and water depth to assist with the interpretation of TDG results. Total dissolved gas was depth-compensated to determine when levels were high enough to potentially affect sac fry. This report provides detailed descriptions of the two study sites downstream of Bonneville Dam, as well as the equipment and procedures employed to monitor the TDG levels at the study sites. Results of the monitoring at both sites are then presented in both text and graphics. The findings and recommendations for further research are discussed, followed by a listing of the references cited in the report.« less
Effects of Outlets on Cracking Risk and Integral Stability of Super-High Arch Dams
Hu, Hang
2014-01-01
In this paper, case study on outlet cracking is first conducted for the Goupitan and Xiaowan arch dams. A nonlinear FEM method is then implemented to study effects of the outlets on integral stability of the Xiluodu arch dam under two loading conditions, i.e., normal loading and overloading conditions. On the basis of the case study and the numerical modelling, the outlet cracking mechanism, risk, and corresponding reinforcement measures are discussed. Furthermore, the numerical simulation reveals that (1) under the normal loading conditions, the optimal distribution of the outlets will contribute to the tensile stress release in the local zone of the dam stream surface and decrease the outlet cracking risk during the operation period. (2) Under the overloading conditions, the cracks initiate around the outlets, then propagate along the horizontal direction, and finally coalesce with those in adjacent outlets, where the yield zone of the dam has a shape of butterfly. Throughout this study, a dam outlet cracking risk control and reinforcement principle is proposed to optimize the outlet design, select the appropriate concrete material, strengthen the temperature control during construction period, design reasonable impounding scheme, and repair the cracks according to their classification. PMID:25152907
Development of a multimetric index for fish assemblages in a cold tailwater in Tennessee
Ivasauskas, Tomas J.; Bettoli, Phillip William
2014-01-01
Tailwaters downstream of hypolimnetic-release hydropeaking dams exhibit a unique combination of stressors that affects the structure and function of resident fish assemblages. We developed a statistically and biologically defensible multimetric index of fish assemblages for the Caney Fork River below Center Hill Dam, Tennessee. Fish assemblages were sampled at five sites using boat-mounted and backpack electrofishing gear from fall 2009 through summer 2011. A multivariate statistical approach was used to select metrics that best reflected the downstream gradients in abiotic variables. Five metrics derived from boat electrofishing samples and four metrics derived from backpack electrofishing samples were selected for incorporation into the index based on their high correlation with environmental data. The nine metrics demonstrated predictable patterns of increase or decrease with increasing distance downstream of the dam. The multimetric index generally exhibited a pattern of increasing scores with increasing distance from the dam, indicating a downstream recovery gradient in fish assemblage composition. The index can be used to monitor anticipated changes in the fish communities of the Caney Fork River when repairs to Center Hill Dam are completed later this decade, resulting in altered dam operations.
Adams, Noah S.; Hansel, Hal C.; Perry, Russell W.; Evans, Scott D.
2012-01-01
We analyzed 6 years (2004-09) of passage and survival data collected at McNary Dam to examine how spill bay operations affect survival of juvenile salmonids passing through the spillway at McNary Dam. We also examined the relations between spill bay operations and survival through the juvenile fish bypass in an attempt to determine if survival through the bypass is influenced by spill bay operations. We used a Cormack-Jolly-Seber release-recapture model (CJS model) to determine how the survival of juvenile salmonids passing through McNary Dam relates to spill bay operations. Results of these analyses, while not designed to yield predictive models, can be used to help develop dam-operation strategies that optimize juvenile salmonid survival. For example, increasing total discharge typically had a positive effect on both spillway and bypass survival for all species except sockeye salmon (Oncorhynchus nerka). Likewise, an increase in spill bay discharge improved spillway survival for yearling Chinook salmon (Oncorhynchus tshawytscha), and an increase in spillway discharge positively affected spillway survival for juvenile steelhead (Oncorhynchus mykiss). The strong linear relation between increased spill and increased survival indicates that increasing the amount of water through the spillway is one strategy that could be used to improve spillway survival for yearling Chinook salmon and juvenile steelhead. However, increased spill did not improve spillway survival for subyearling Chinook salmon and sockeye salmon. Our results indicate that a uniform spill pattern would provide the highest spillway survival and bypass survival for subyearling Chinook salmon. Conversely, a predominantly south spill pattern provided the highest spillway survival for yearling Chinook salmon and juvenile steelhead. Although spill pattern was not a factor for spillway survival of sockeye salmon, spill bay operations that optimize passage through the north and south spill bays maximized spillway survival for this species. Bypass survival of yearling Chinook salmon could be improved by optimizing conditions to facilitate bypass passage at night, but the method to do so is not apparent from this analysis because photoperiod was the only factor affecting bypass survival based on the best and only supported model. Bypass survival of juvenile steelhead would benefit from lower water temperatures and increased total and spillway discharge. Likewise, subyearling Chinook salmon bypass survival would improve with lower water temperatures, increased total discharge, and a uniform spill pattern.
Dam Breach Release of Non-Cohesive Sediments: Channel Response and Recovery Rates
NASA Astrophysics Data System (ADS)
Collins, M. J.; Boardman, G.; Banks, W.; Andrews, M.; Conlon, M.; Dillow, J. J. A.; Gellis, A.; Lowe, S.; McClain, S.; Miller, A. J.; Snyder, N. P.; Wilcock, P. R.
2014-12-01
Dam removals featuring unchecked releases of non-cohesive sediments are excellent opportunities to learn more about stream channel response to abrupt increases in bed material supply that can occur deliberately or by natural processes like landslides and volcanic eruptions. Understanding channel response to sediment pulses, including response rates, is essential because human uses of river channels and floodplains are impacted by these events as are aquatic habitats. We had the opportunity to study a dam removal site at the Simkins Dam in Maryland, USA, that shares many important geophysical attributes of another well-studied dam removal in the humid northeast United States [Merrimack Village Dam, New Hampshire; Pearson et al., 2011]. The watershed sizes are the same order of magnitude (102 km2), and at both sites relatively low head dams were removed (~ 3-4 m) and ~60,000 m3 of dominantly sand-sized sediments discharged to low-gradient reaches immediately downstream. Analyzing four years of repeat morphometry and bed sediment grain size surveys at the Simkins site on the Patapsco River, as well as continuous discharge and suspended sediment gaging data, we clearly document a two-phase response in the upstream reach as described by Pearson et al. [2011] for their New Hampshire site and noted at other dam removals [e.g., Major et al., 2012]. In the early phase, approximately 50% of the impounded sediment mass was eroded rapidly over a period of about three months when flows were very modest (Figure 1). After incision to base level and channel widening in the former impoundment, a second phase began when further erosion depended on floods large enough to access impounded sediments more distant from the newly-formed channel. We also found important differences in the upstream responses at the Maryland and New Hampshire sites that appear to be related to valley type (non-glaciated versus glaciated, respectively). Response variances immediately downstream between the respective sites are potentially related to local gradient and hydraulics.
1980-08-01
4 985 G DEPARTMENT OF THE ARMY [ NEW ENGLAND DIVISION, CORPS OF ENGINEERS WALTHAM, MASS. 02154 * DI~~~~h~ U~M ~qE M W A " AUGUST 1_App buomr w...AODREO9(if diffemen IC l mMA OfUice) IS. SECURITY CLASS. (of ShJi r.90,) UNCLASSIFIED IS. DC-ASSI FIC ATION/DOWNGRADIN G SCN DULE I6. DISTRIBUTION... g . Purpose of Dam 2 h. Design and Construction History 3 i. Normal Operational Procedure 3 1.3 Pertinent Data 3 2. ENGINEERING DATA 2.1 Design
Melis, Theodore S.; Walters, Carl; Korman, Josh
2015-01-01
With a focus on resources of the Colorado River ecosystem below Glen Canyon Dam, the Glen Canyon Dam Adaptive Management Program has included a variety of experimental policy tests, ranging from manipulation of water releases from the dam to removal of non-native fish within Grand Canyon National Park. None of these field-scale experiments has yet produced unambiguous results in terms of management prescriptions. But there has been adaptive learning, mostly from unanticipated or surprising resource responses relative to predictions from ecosystem modeling. Surprise learning opportunities may often be viewed with dismay by some stakeholders who might not be clear about the purpose of science and modeling in adaptive management. However, the experimental results from the Glen Canyon Dam program actually represent scientific successes in terms of revealing new opportunities for developing better river management policies. A new long-term experimental management planning process for Glen Canyon Dam operations, started in 2011 by the U.S. Department of the Interior, provides an opportunity to refocus management objectives, identify and evaluate key uncertainties about the influence of dam releases, and refine monitoring for learning over the next several decades. Adaptive learning since 1995 is critical input to this long-term planning effort. Embracing uncertainty and surprise outcomes revealed by monitoring and ecosystem modeling will likely continue the advancement of resource objectives below the dam, and may also promote efficient learning in other complex programs.
16. DETAIL VIEW OF AUXILIARY LOCK MITER GATE OPERATING MACHINERY ...
16. DETAIL VIEW OF AUXILIARY LOCK MITER GATE OPERATING MACHINERY LOCATED IN INTERMEDIATE WALL, LOOKING NORTHWEST - Upper Mississippi River 9-Foot Channel Project, Lock & Dam 27, Granite City, Madison County, IL
NASA Astrophysics Data System (ADS)
Giuliani, M.; Herman, J. D.; Castelletti, A.; Reed, P. M.
2013-12-01
Institutional inertia strongly limits our ability to adapt water reservoir operations to better manage growing water demands as well as their associated uncertainties in a changing climate. Although it has long been recognized that these systems are generally framed in heterogeneous socio-economic contexts involving a myriad of conflicting, non-commensurable operating objectives, our broader understanding of the multiobjective consequences of current operating rules as well as their vulnerability to hydroclimatic uncertainties is severely limited. This study proposes a decision analytic framework to overcome policy inertia and myopia in complex river basin management contexts. The framework combines reservoir policy identification and many-objective optimization under uncertainty to characterize current operations and discover key tradeoffs between alternative policies for balancing evolving demands and system uncertainties. The approach is demonstrated on the Conowingo Dam, located within the Lower Susquehanna River, USA. The Lower Susquehanna River is an interstate water body that has been subject to intensive water management efforts due to the system's competing demands from urban water supply, atomic power plant cooling, hydropower production, and federally regulated environmental flows. Initially our proposed framework uses available streamflow observations to implicitly identify the Conowingo Dam's current but unknown operating policy. This baseline policy is identified by fitting radial basis functions to existing system dynamics. Our assumption in the baseline policy is that the dam operator is represented as a rational agent seeking to maximize primary operational objectives (i.e., guaranteeing the public water supply and maximizing the hydropower revenue). The quality of the identified baseline policy is evaluated by its ability to replicate historical release dynamics. Once identified, the historical baseline policy then provides a means of representing the decision preferences guiding current operations. Our results show that the estimated policy closely captures the dynamics of current releases and flows for the Lower Susquehanna. After identifying the historical baseline policy, our proposed decision analytic framework then combines evolutionary many-objective optimization with visual analytics to discover improved operating policies. Our Lower Susquehanna results confirm that the system's current history-based operations are negatively biased to overestimate the reliability of the reservoir's multi-sector services. Moreover, our proposed framework has successfully identified alternative reservoir policies that are more robust to hydroclimatic uncertainties while being capable of better addressing the tradeoffs across the Conowingo Dam's multi-sector services.
Malaria and water resource development: the case of Gilgel-Gibe hydroelectric dam in Ethiopia.
Yewhalaw, Delenasaw; Legesse, Worku; Van Bortel, Wim; Gebre-Selassie, Solomon; Kloos, Helmut; Duchateau, Luc; Speybroeck, Niko
2009-01-29
Ethiopia plans to increase its electricity power supply by five-fold over the next five years to fulfill the needs of its people and support the economic growth based on large hydropower dams. Building large dams for hydropower generation may increase the transmission of malaria since they transform ecosystems and create new vector breeding habitats. The aim of this study was to assess the effects of Gilgel-Gibe hydroelectric dam in Ethiopia on malaria transmission and changing levels of prevalence in children. A cross-sectional, community-based study was carried out between October and December 2005 in Jimma Zone, south-western Ethiopia, among children under 10 years of age living in three 'at-risk' villages (within 3 km from dam) and three 'control' villages (5 to 8 km from dam). The man-made Gilgel-Gibe dam is operating since 2004. Households with children less than 10 years of age were selected and children from the selected households were sampled from all the six villages. This included 1,081 children from 'at-risk' villages and 774 children from 'control' villages. Blood samples collected from children using finger prick were examined microscopically to determine malaria prevalence, density of parasitaemia and identify malarial parasite species. Overall 1,855 children (905 girls and 950 boys) were surveyed. A total of 194 (10.5%) children were positive for malaria, of which, 117 (60.3%) for Plasmodium vivax, 76 (39.2%) for Plasmodium falciparum and one (0.5%) for both P. vivax and P. falciparum. A multivariate design-based analysis indicated that, while controlling for age, sex and time of data collection, children who resided in 'at-risk' villages close to the dam were more likely to have P. vivax infection than children who resided farther away (odds ratio (OR) = 1.63, 95% CI = 1.15, 2.32) and showed a higher OR to have P. falciparum infection than children who resided in 'control' villages, but this was not significant (OR = 2.40, 95% CI = 0.84, 6.88). A classification tree revealed insights in the importance of the dam as a risk factor for malaria. Assuming that the relationship between the dam and malaria is causal, 43% of the malaria occurring in children was due to living in close proximity to the dam. This study indicates that children living in close proximity to a man-made reservoir in Ethiopia are at higher risk of malaria compared to those living farther away. It is recommended that sound prevention and control programme be designed and implemented around the reservoir to reduce the prevalence of malaria. In this respect, in localities near large dams, health impact assessment through periodic survey of potential vectors and periodic medical screening is warranted. Moreover, strategies to mitigate predicted negative health outcomes should be integral parts in the preparation, construction and operational phases of future water resource development and management projects.
Malaria and water resource development: the case of Gilgel-Gibe hydroelectric dam in Ethiopia
Yewhalaw, Delenasaw; Legesse, Worku; Van Bortel, Wim; Gebre-Selassie, Solomon; Kloos, Helmut; Duchateau, Luc; Speybroeck, Niko
2009-01-01
Background Ethiopia plans to increase its electricity power supply by five-fold over the next five years to fulfill the needs of its people and support the economic growth based on large hydropower dams. Building large dams for hydropower generation may increase the transmission of malaria since they transform ecosystems and create new vector breeding habitats. The aim of this study was to assess the effects of Gilgel-Gibe hydroelectric dam in Ethiopia on malaria transmission and changing levels of prevalence in children. Methods A cross-sectional, community-based study was carried out between October and December 2005 in Jimma Zone, south-western Ethiopia, among children under 10 years of age living in three 'at-risk' villages (within 3 km from dam) and three 'control' villages (5 to 8 km from dam). The man-made Gilgel-Gibe dam is operating since 2004. Households with children less than 10 years of age were selected and children from the selected households were sampled from all the six villages. This included 1,081 children from 'at-risk' villages and 774 children from 'control' villages. Blood samples collected from children using finger prick were examined microscopically to determine malaria prevalence, density of parasitaemia and identify malarial parasite species. Results Overall 1,855 children (905 girls and 950 boys) were surveyed. A total of 194 (10.5%) children were positive for malaria, of which, 117 (60.3%) for Plasmodium vivax, 76 (39.2%) for Plasmodium falciparum and one (0.5%) for both P. vivax and P. falciparum. A multivariate design-based analysis indicated that, while controlling for age, sex and time of data collection, children who resided in 'at-risk' villages close to the dam were more likely to have P. vivax infection than children who resided farther away (odds ratio (OR) = 1.63, 95% CI = 1.15, 2.32) and showed a higher OR to have P. falciparum infection than children who resided in 'control' villages, but this was not significant (OR = 2.40, 95% CI = 0.84, 6.88). A classification tree revealed insights in the importance of the dam as a risk factor for malaria. Assuming that the relationship between the dam and malaria is causal, 43% of the malaria occurring in children was due to living in close proximity to the dam. Conclusion This study indicates that children living in close proximity to a man-made reservoir in Ethiopia are at higher risk of malaria compared to those living farther away. It is recommended that sound prevention and control programme be designed and implemented around the reservoir to reduce the prevalence of malaria. In this respect, in localities near large dams, health impact assessment through periodic survey of potential vectors and periodic medical screening is warranted. Moreover, strategies to mitigate predicted negative health outcomes should be integral parts in the preparation, construction and operational phases of future water resource development and management projects. PMID:19178727
Beeman, John W.; Hansen, Amy C.; Evans, Scott D.; Haner, Philip V.; Hansel, Hal C.; Smith, Collin D.
2012-01-01
Cougar Dam near Springfield, Oregon, is one of several federally owned and operated flood-control projects within the Willamette Valley of western Oregon that were determined by the National Oceanic and Atmospheric Administration’s National Marine Fisheries Service in 2008 to impact the long-term viability of several salmonid stocks. In response to this ruling, the U.S. Army Corps of Engineers is looking for means to reduce impacts to salmonids, including improving downstream passage of juvenile salmonids at Cougar Dam. This study of juvenile Chinook salmon (Oncorhynchus tshawytscha) passage at Cougar Dam was conducted to inform decisions about potential improvements for downstream fish passage. The primary objective of the study was to estimate route-specific passage probabilities of yearling Chinook salmon at Cougar Dam. The study was conducted using fish from a nearby hatchery surgically implanted with radio transmitters and passive integrated transponder (PIT) tags and released near the entrance of a temperature control tower through which all water going through the dam must pass. Water passing through the temperature control tower may be routed through a penstock to a powerhouse with two Francis turbines, or to a spillway-like structure called the regulating outlet. Secondary objectives of the study were to estimate the probability that fish enter a bypass at a non-federal facility downstream, and to estimate dam-passage and in-river fish survival. Dam operating conditions during the study included an average forebay elevation of 1,580 feet (National Geodetic Vertical Datum of 1929) and an average of 48.2 percent of the total dam discharge of 1,106 cubic feet per second passing through a regulating outlet opening of 1.25 feet. Dam passage probability was greatest at night (0.8741 standard error [SE] 0.0265) and primarily through the regulating outlet (0.8896 SE 0.0617 day; 0.9417 SE 0.0175 night). The joint probability of entering the bypass at Leaburg Dam and being detected at the PIT system within the bypass was 0.0755 (SE 0.0363), but some fish were known to pass the PIT system undetected, indicating that the true probability of entering the bypass was underestimated. The estimated survival of fish passing through the temperature control tower, through the dam, and to a site at a bridge over the South Fork of the McKenzie River 3.9 kilometers downstream was 0.3680 (SE 0.1322) for fish passing through the powerhouse, and 0.4247 (SE 0.0440) for fish passing through the regulating outlet. The estimated in-river survival through the 37.3 kilometers from the bridge to a site at Leaburg Hatchery on the McKenzie River was 0.5857 (SE 0.2227) for fish that had passed through the powerhouse, and 0.4537 (SE 0.0551) for fish that had passed through the regulating outlet.
Wallace, Jacqueline M; Aitken, Raymond P; Milne, John S; Hay, William W
2004-10-01
Human adolescent pregnancy is characterized by poor pregnancy outcome; the risks of spontaneous miscarriage, prematurity, and low birth weight are particularly acute in girls who are still growing at the time of conception. Studies using a highly controlled sheep paradigm demonstrate that, in growing adolescents who are overnourished throughout pregnancy, growth of the placenta is impaired, resulting in a decrease in lamb birth weight relative to control-fed adolescents of equivalent age. Rapid maternal growth is also associated with increased spontaneous abortion rates in late gestation and a reduction in gestation length. Nutritionally sensitive hormones of the maternal somatotrophic axis may orchestrate nutrient partitioning in this paradigm and the particular role of growth hormone is discussed. At midgestation, the placentae of rapidly growing dams exhibit less proliferation in the fetal trophectoderm and reduced placental mRNA expression of a range of angiogenic factors. These changes occur before differences in placental size are apparent but may impact on subsequent vascularity. By late pregnancy, placental mass in the rapidly growing versus the control dams is reduced by approximately 45%; the fetuses display asymmetric growth restriction and are hypoxic and hypoglycemic. These growth-restricted pregnancies are associated with major reductions in absolute uterine and umbilical blood flows, leading to attenuated fetal oxygen, glucose, and amino acid uptakes. Placental glucose transport capacity is markedly reduced in the rapidly growing dams but is normal when expressed on a weight-specific placental basis. Thus, it is the small size of the placenta per se rather than alterations in its nutrient metabolism or transfer capacity that is the major limitation to fetal growth in the growing adolescent sheep. Information obtained from this highly controlled paradigm is clearly relevant to the clinical management of human adolescent pregnancies. In addition, the paradigm provides a robust model of placental growth restriction that replicates many of the key features of human intrauterine growth restriction per se.
Izzo, Lisa K.; Maynard, George A.; Zydlewski, Joseph D.
2016-01-01
The Penobscot River Restoration Project (PRRP), to be completed in 2016, involved an extensive plan of dam removal, increases in hydroelectric capacity, and fish passage modifications to increase habitat access for diadromous species. As part of the PRRP, Great Works and Veazie dams were removed, making Milford Dam the first impediment to federally endangered Atlantic Salmon Salmo salar. Upstream habitat access for Atlantic Salmon is dependent upon successful and timely passage at Milford Dam because nearly all suitable spawning habitat is located upstream. In 2014 and 2015, a total of 73 adult salmon were radio-tagged to track their upstream movements through the Penobscot River to assess potential delays at (1) the dam remnants, (2) the confluence of the Stillwater Branch and the main stem of the Penobscot River below the impassable Orono Dam, and (3) the Milford Dam fish lift (installed in 2014). Movement rates through the dam remnants and the Stillwater confluence were comparable to open river reaches. Passage efficiency of the fish lift was high in both years (95% and 100%). However, fish experienced long delays at Milford Dam, with approximately one-third of fish taking more than a week to pass in each year, well below the Federal Energy Regulatory Commission passage standard of 95% within 48 h. Telemetry indicates most fish locate the fishway entrance within 5 h of arrival and were observed at the entrance at all hours of the day. These data indicate that overall transit times through the lower river were comparable to reported movement rates prior to changes to the Penobscot River due to the substantial delays seen at Milford Dam. The results of this study show that while adult Atlantic Salmon locate the new fish lift entrance quickly, passage of these fish was significantly delayed under 2014–2015 operations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunnigan, James; DeShazer, J.; Garrow, L.
Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possiblemore » conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to 'protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to restore the fisheries and fish habitat in basin streams and lakes. 'Mitigation for the Construction and Operation of Libby Dam' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Khan, Fenton; Johnson, Gary E.; Weiland, Mark A.
2009-09-01
This report presents the results of an evaluation of overwintering summer steelhead (Oncorhynchus mykiss) fallback and early out-migrating steelhead kelts downstream passage at The Dalles Dam (TDA) sluiceway and turbines during fall/winter 2008 and early spring 2009, respectively. The study was conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers, Portland District (USACE). Operating the sluiceway reduces the potential for hydropower production. However, this surface flow outlet may be the optimal non-turbine route for fallbacks in late fall after the sluiceway is typically closed for juvenile fish passage and for overwintering summer steelhead andmore » kelt passage in the early spring before the start of the voluntary spill season. The goal of this study was to characterize adult steelhead spatial and temporal distributions and passage rates at the sluiceway and turbines, and their movements in front of the sluiceway at TDA to inform fisheries managers’ and engineers’ decision-making relative to sluiceway operations. The study periods were from November 1 to December 15, 2008 (45 days) and from March 1 to April 9, 2009 (40 days). The study objectives were to 1) estimate the number and distribution of overwintering summer steelhead fallbacks and kelt-sized acoustic targets passing into the sluiceway and turbines at TDA during the two study periods, respectively, and 2) assess the behavior of these fish in front of sluice entrances. We obtained fish passage data using fixed-location hydroacoustics and fish behavior data using acoustic imaging. For the overwintering summer steelhead, fallback occurred throughout the 45-day study period. We estimated that a total of 1790 ± 250 (95% confidence interval) summer steelhead targets passed through the powerhouse intakes and operating sluices during November 1 to December 15, 2008. Ninety five percent of these fish passed through the sluiceway. Therefore, without the sluiceway as a route through the dam, a number of steelhead may have fallen back through turbines. Run timing peaked in late November, but fish continued to pass the dam until the end of the study. Horizontal distribution data indicated that sluice 1 is the preferred route for these fish during fallback through the dam. Diel distribution for overwintering steelhead fallbacks was variable with no apparent distinct patterns. Therefore, sluiceway operations should not be based on diel distribution. For the early spring study, overwintering summer steelhead and early out-migrating steelhead kelt downstream passage occurred throughout the 40-day study period. A total of 1766 ± 277 (95% confidence interval) kelt-size targets were estimated to have passed through the powerhouse intakes and operating sluices. Ninety five percent of these fish passed through the sluiceway. Therefore, as with steelhead fallback, not having the sluiceway as a route through the dam, a number of overwintering steelhead and kelts may use the turbines for downstream passage before the start of the spill season. Run timing peaked in late March; however, relatively large numbers of kelt-sized targets passed the dam on March 2 and March 6 (162 and 188 fish, respectively). Horizontal distribution indicated that sluice 1 is the preferred route for these adult salmonids as they migrate downstream through the dam. Again, no clear pattern was seen for diel distribution of overwintering steelhead and early out-migrating kelt passage.« less
Flooding Caused by the Collapse of the Zeyzoun Dam, Syria
NASA Technical Reports Server (NTRS)
2002-01-01
On Tuesday the Zeyzoun dam in northern Syria ruptured and collapsed, killing 20 people and leaving thousands more homeless. This false-color image taken on June 5, 2002, (bottom) by the Moderate-resolution Imaging Spectroradiometer (MODIS) instrument aboard NASA's Terra satellite shows the extent of the flooding. Normally, there would be no water present in the center of the image (top, acquired on June 3, 2002). After the dam burst, 71 million cubic meters flowed onto the surrounding landscape and washed over an area of 20,000 acres. Hundreds of homes were destroyed in and around the villages of Zeyzoun, Qastoun, and Ziara, roughly 220 miles (350 kilometers) north of Damascus. Most of the residents fled to higher ground with the help of two helicopters. The Syrians originally constructed the dam to contain the Orontes River and provide a steady flow of water to the surrounding farms, many of which were lost. Rescue workers worry that more bodies may be found as the waters of the dam recede. The Japanese government issued more than $40,000 in aid for the victims, and the Syrian government is petitioning international aid agencies for further assistance. In this false-color image, the ground is sage green and rusty orange, and water is black. Clouds appear pink. Image courtesy Jacques Descloitres, MODIS Land Rapid Response Team at NASA GSFC
Supporting response with science: the Oso, Washington, landslide
NASA Astrophysics Data System (ADS)
Godt, J.
2014-12-01
On 22 March 2014 a large, rapidly moving landslide impacted the community of Steelhead Haven, near Oso, Washington, killing 43 people. The slide displaced about 8 million m3 of sand and silt from a 200-m high glacial terrace destroying 40 homes and burying more than 1.0 km of State Route 530. The landslide temporarily dammed the North Fork of the Stillaguamish River flooding an area of about 1.4 km2. The unusually long travel distance, in excess of 700 m from the base of the slope, and apparent speed of the slide led to the great loss of life and destruction. Landslide science was critical in supporting the response to the disaster. Landslide monitoring, process understanding, pre- and post-event high-resolution digital topography, and numerical simulations were used to advise search operations. Recognizing that buildings and their contents were swept tens to hundreds of meters from their original locations, maps of deposit thickness, and estimates of landslide trajectories were used to develop safer and more efficient search strategies. Teams of county, state, and federal scientists, engineers, and specialists were formed to assess the stability of the landslide dam and to monitor stream flow and the level of the lake impounded by the slide, and to assess the geomorphic response of the river to the landslide for gauging future effects on flood hazards and aquatic ecosystems. Another scientific team assessed the threat of additional landslide activity to search operations. This team's activities included establishing a communications protocol among landslide watch officers and search operations, deploying instrument platforms developed for use on volcanoes (Spiders) to remotely detect ground movement by means of GPS technology and to detect vibrations indicative of landslide movement using seismometers. The team was responsible for monitoring and integrating data from the Spiders and other instruments and making determinations with regards to the potential for additional landsliding during daylight hours, 7 days a week, until the conclusion of active search operations on 28 April 2014. Landslide understanding, data collected prior to and during the response, and modeling results were critical for informing search operations, decision makers, and the community.
Floodplain lakes and alluviation cycles of the lower Colorado River
NASA Astrophysics Data System (ADS)
Malmon, D.; Felger, T. J.; Howard, K. A.
2007-05-01
The broad valleys along the lower Colorado River contain numerous bodies of still water that provide critical habitat for bird, fish, and other species. This chain of floodplain lakes is an important part of the Pacific Flyway - the major north-south route of travel for migratory birds in the western Hemisphere - and is also used by many resident bird species. In addition, isolated floodplain lakes may provide the only viable habitat for endangered native fish such as the razorback sucker, vulnerable to predation by introduced species in the main stem of the Colorado River. Floodplain lakes typically occupy former channel courses of the river and formed as a result of river meandering or avulsion. Persistent fluvial sediment deposition (aggradation) creates conditions that favor rapid formation and destruction of floodplain lakes, while long term river downcutting (degradation) inhibits their formation and evolution. New radiocarbon dates from wood recovered from drill cores near Topock, AZ indicate that the river aggraded an average of 3 mm/yr in the middle and late Holocene. Aggradational conditions before Hoover Dam was built were associated with rapid channel shifting and frequent lake formation. Lakes had short life spans due to rapid infilling with fine-grained sediment during turbid floods on the unregulated Colorado River. The building of dams and of armored banks had a major impact on floodplain lakes, not only by drowning large portions of the valley beneath reservoirs, but by preventing new lake formation in some areas and accelerating it in others. GIS analyses of three sets of historical maps show that both the number and total area of isolated (i.e., not linked to the main channel by a surface water connection) lakes in the lower Colorado River valley increased between 1902 and the 1950s, and then decreased though the 1970s. River bed degradation below dams inhibits channel shifting and floodplain lake formation, and the capture of fines behind the dams has prevented sediment infilling of the lakes. Bed lowering below dams and in artificially confined reaches could potentially dewater floodplain lakes, a process occurring at Beal Lake, a natural lake used for native fish restoration in the Havasu National Wildlife Refuge. Sedimentation near the upstream ends of reservoirs has created large areas of still water. One of the largest, Topock Marsh, is connected to the main channel, restricting its usefulness as a native fish nursery; other backwater areas are confined by bars that isolate standing water at tributaries.
NASA Astrophysics Data System (ADS)
Wang, Wanshun; Chen, Zhuo; Li, Xiuwen
2018-03-01
The safety monitoring is very important in the operation and management of water resources and hydropower projects. It is the important means to understand the dam running status, to ensure the dam safety, to safeguard people’s life and property security, and to make full use of engineering benefits. This paper introduces the arrangement of engineering safety monitoring system based on the example of a water resource control project. The monitoring results of each monitoring project are analyzed intensively to show the operating status of the monitoring system and to provide useful reference for similar projects.
Seasonal variation of water quality in a lateral hyporheic zone with response to dam operations
NASA Astrophysics Data System (ADS)
Chen, X.; Chen, L.; Zhao, J.
2015-12-01
Aquatic environment of lateral hyporheic zone in a regulated river were investigated seasonally under fluctuated water levels induced by dam operations. Groundwater levels variations in preassembled wells and changes in electronic conductivity (EC), dissolved oxygen (DO) concentration, water temperature and pH in the hyporheic zone were examined as environmental performance indicators for the water quality. Groundwater tables in wells were highly related to the river water levels that showed a hysteresis pattern, and the lag time is associated with the distances from wells to the river bank. The distribution of DO and EC were strongly related to the water temperature, indicating that the cold water released from up-reservoir could determine the biochemistry process in the hyporheic zone. Results also showed that the hyporheic water was weakly alkaline in the study area but had a more or less uniform spatial distribution. Dam release-storage cycles were the dominant factor in changing lateral hyporheic flow and water quality.
Modeling Total Dissolved Gas for Optimal Operation of Multireservoir Systems
Politano, Marcela; Castro, Alejandro; Hadjerioua, Boualem
2017-02-09
One important environmental issue of hydropower in the Columbia and Snake River Basins (Pacific Northwest region of United States) is elevated total dissolved gas (TDG) downstream of a dam, which has the potential to cause gas bubble disease in affected fish. Gas supersaturation in the Columbia River Basin primarily occurs due to dissolution of bubbles entrained during spill events. This paper presents a physically based TDG model that can be used to optimize spill operations in multireservoir hydropower systems. Independent variables of the model are forebay TDG, tailwater elevation, spillway and powerhouse discharges, project head, and environmental parameters such asmore » temperature and atmospheric pressure. The model contains seven physically meaningful experimental parameters, which were calibrated and validated against TDG data collected downstream of Rock Island Dam (Washington) from 2008 to 2012. In conclusion, a sensitivity analysis was performed to increase the understanding of the relationships between TDG downstream of the dam and processes such as air entrainment, lateral powerhouse flow, and dissolution.« less
NASA Astrophysics Data System (ADS)
Zahar, Yadh; Ghorbel, Abdelmajid; Albergel, Jean
2008-04-01
SummarySince the opening of the Sidi Salem dam on the watercourse of the Medjerda, in 1981, an alarming narrowing of the riverbed in the lower valley has been observed. This geo-morphological change is attributed to different factors ranking from the reduction in the discharge flows, which used to clean out the riverbed to the periodic releases of turbid water undertaken to remove the silt deposition inside the reservoir, which increased the sediment deposition in the downstream channel. Other smaller hydraulic projects are also held responsible for the loss of the water velocity including a series of concrete sills meant to raise water levels, numerous cross bridges and the management of the downstream Laroussia dam regulating the discharge from the Cap Bon canal. The above anthropogenic factors, in conjunction with natural topographical conditions characterized by a generally shallow slope and a very sinuous watercourse, led to an extremely rapid aggradation of the downstream channel-bed. This paper proposes an analysis of this process and argues that the resulting reduction in channel capacity is one of the major causes of the large floods experienced in the country since 1996.
DOE Office of Scientific and Technical Information (OSTI.GOV)
FLANAGAN,A; SCHACHTER,J.M; SCHISSEL,D.P
2003-02-01
A Data Analysis Monitoring (DAM) system has been developed to monitor between pulse physics analysis at the DIII-D National Fusion Facility (http://nssrv1.gat.com:8000/dam). The system allows for rapid detection of discrepancies in diagnostic measurements or the results from physics analysis codes. This enables problems to be detected and possibly fixed between pulses as opposed to after the experimental run has concluded thus increasing the efficiency of experimental time. An example of a consistency check is comparing the experimentally measured neutron rate and the expected neutron emission, RDD0D. A significant difference between these two values could indicate a problem with one ormore » more diagnostics, or the presence of unanticipated phenomena in the plasma. This new system also tracks the progress of MDSplus dispatched data analysis software and the loading of analyzed data into MDSplus. DAM uses a Java Servlet to receive messages, CLIPS to implement expert system logic, and displays its results to multiple web clients via HTML. If an error is detected by DAM, users can view more detailed information so that steps can be taken to eliminate the error for the next pulse.« less
System to monitor data analyses and results of physics data validation between pulses at DIII-D
NASA Astrophysics Data System (ADS)
Flanagan, S.; Schachter, J. M.; Schissel, D. P.
2004-06-01
A data analysis monitoring (DAM) system has been developed to monitor between pulse physics analysis at the DIII-D National Fusion Facility (http://nssrv1.gat.com:8000/dam). The system allows for rapid detection of discrepancies in diagnostic measurements or the results from physics analysis codes. This enables problems to be detected and possibly fixed between pulses as opposed to after the experimental run has concluded, thus increasing the efficiency of experimental time. An example of a consistency check is comparing the experimentally measured neutron rate and the expected neutron emission, RDD0D. A significant difference between these two values could indicate a problem with one or more diagnostics, or the presence of unanticipated phenomena in the plasma. This system also tracks the progress of MDSplus dispatched data analysis software and the loading of analyzed data into MDSplus. DAM uses a Java Servlet to receive messages, C Language Integrated Production System to implement expert system logic, and displays its results to multiple web clients via Hypertext Markup Language. If an error is detected by DAM, users can view more detailed information so that steps can be taken to eliminate the error for the next pulse.
Large-scale projects in the amazon and human exposure to mercury: The case-study of the Tucuruí Dam.
Arrifano, Gabriela P F; Martín-Doimeadios, Rosa C Rodríguez; Jiménez-Moreno, María; Ramírez-Mateos, Vanesa; da Silva, Núbia F S; Souza-Monteiro, José Rogério; Augusto-Oliveira, Marcus; Paraense, Ricardo S O; Macchi, Barbarella M; do Nascimento, José Luiz M; Crespo-Lopez, Maria Elena
2018-01-01
The Tucuruí Dam is one of the largest dams ever built in the Amazon. The area is not highly influenced by gold mining as a source of mercury contamination. Still, we recently noted that one of the most consumed fishes (Cichla sp.) is possibly contaminated with methylmercury. Therefore, this work evaluated the mercury content in the human population living near the Tucuruí Dam. Strict exclusion/inclusion criteria were applied for the selection of participants avoiding those with altered hepatic and/or renal functions. Methylmercury and total mercury contents were analyzed in hair samples. The median level of total mercury in hair was above the safe limit (10µg/g) recommended by the World Health Organization, with values up to 75µg/g (about 90% as methylmercury). A large percentage of the participants (57% and 30%) showed high concentrations of total mercury (≥ 10µg/g and ≥ 20µg/g, respectively), with a median value of 12.0µg/g. These are among the highest concentrations ever detected in populations living near Amazonian dams. Interestingly, the concentrations are relatively higher than those currently shown for human populations highly influenced by gold mining areas. Although additional studies are needed to confirm the possible biomagnification and bioaccumulation of mercury by the dams in the Amazon, our data already support the importance of adequate impact studies and continuous monitoring. More than 400 hydropower dams are operational or under construction in the Amazon, and an additional 334 dams are presently planned/proposed. Continuous monitoring of the populations will assist in the development of prevention strategies and government actions to face the problem of the impacts caused by the dams. Copyright © 2017 Elsevier Inc. All rights reserved.
The potential impact of new Andean dams on Amazon fluvial ecosystems
Melack, John M.; Dunne, Thomas; Barthem, Ronaldo B.; Goulding, Michael; Paiva, Rodrigo C. D.; Sorribas, Mino V.; Silva, Urbano L.; Weisser, Sabine
2017-01-01
Increased energy demand has led to plans for building many new dams in the western Amazon, mostly in the Andean region. Historical data and mechanistic scenarios are used to examine potential impacts above and below six of the largest dams planned for the region, including reductions in downstream sediment and nutrient supplies, changes in downstream flood pulse, changes in upstream and downstream fish yields, reservoir siltation, greenhouse gas emissions and mercury contamination. Together, these six dams are predicted to reduce the supply of sediments, phosphorus and nitrogen from the Andean region by 69, 67 and 57% and to the entire Amazon basin by 64, 51 and 23%, respectively. These large reductions in sediment and nutrient supplies will have major impacts on channel geomorphology, floodplain fertility and aquatic productivity. These effects will be greatest near the dams and extend to the lowland floodplains. Attenuation of the downstream flood pulse is expected to alter the survival, phenology and growth of floodplain vegetation and reduce fish yields below the dams. Reservoir filling times due to siltation are predicted to vary from 106–6240 years, affecting the storage performance of some dams. Total CO2 equivalent carbon emission from 4 Andean dams was expected to average 10 Tg y-1 during the first 30 years of operation, resulting in a MegaWatt weighted Carbon Emission Factor of 0.139 tons C MWhr-1. Mercury contamination in fish and local human populations is expected to increase both above and below the dams creating significant health risks. Reservoir fish yields will compensate some downstream losses, but increased mercury contamination could offset these benefits. PMID:28832638
Impacts of large dams on the complexity of suspended sediment dynamics in the Yangtze River
NASA Astrophysics Data System (ADS)
Wang, Yuankun; Rhoads, Bruce L.; Wang, Dong; Wu, Jichun; Zhang, Xiao
2018-03-01
The Yangtze River is one of the largest and most important rivers in the world. Over the past several decades, the natural sediment regime of the Yangtze River has been altered by the construction of dams. This paper uses multi-scale entropy analysis to ascertain the impacts of large dams on the complexity of high-frequency suspended sediment dynamics in the Yangtze River system, especially after impoundment of the Three Gorges Dam (TGD). In this study, the complexity of sediment dynamics is quantified by framing it within the context of entropy analysis of time series. Data on daily sediment loads for four stations located in the mainstem are analyzed for the past 60 years. The results indicate that dam construction has reduced the complexity of short-term (1-30 days) variation in sediment dynamics near the structures, but that complexity has actually increased farther downstream. This spatial pattern seems to reflect a filtering effect of the dams on the on the temporal pattern of sediment loads as well as decreased longitudinal connectivity of sediment transfer through the river system, resulting in downstream enhancement of the influence of local sediment inputs by tributaries on sediment dynamics. The TGD has had a substantial impact on the complexity of sediment series in the mainstem of the Yangtze River, especially after it became fully operational. This enhanced impact is attributed to the high trapping efficiency of this dam and its associated large reservoir. The sediment dynamics "signal" becomes more spatially variable after dam construction. This study demonstrates the spatial influence of dams on the high-frequency temporal complexity of sediment regimes and provides valuable information that can be used to guide environmental conservation of the Yangtze River.
Efficiency evaluation of agricultural underground dam in South Korea
NASA Astrophysics Data System (ADS)
Myoung, W.; Song, S. H.; Yong, H. H.
2017-12-01
Climate change has resulted in severe droughts in a rice-planting season (i.e., April to June) in South Korea since 2012. Therefore, all time high-amount water resources in rice-farming seasons (i.e., April to October) were required against natural crises like droughts. The underground dam, which is able to increase groundwater amounts in the alluvium aquifer, has been considered to be an alternative for securing more groundwater resources. In this study, irrigation efficiencies of five pre-existing agricultural underground dams in South Korea were evaluated during the drought periods. A total amount of groundwater storage capacities in alluvial aquifers of these five ones were estimated approximate 15 × 107 m3: above 4 × 106 m3 for two underground dams (Ian, Namsong), 2 3 × 106 m3, for 2 dams (Oksung, Wooil), below 2 × 106 m3 for 1 dam (Gocheon), respectively. Irrigating amounts of groundwater accounted for three underground dams (Ian, Namsong, Gocheon), supplied in rice-farming season are 8.5 × 105 m3/year, 8.3 × 105 m3/year, 6.3 × 105 m3/year, respectively. The total demand of agricultural water in these underground dams is 2.0 × 106 m3/year, 1.9 × 106 m3/year, 2.2 × 106 m3/year, respectively. Irrigating amounts of groundwater accounted for whole of rice-farming area in South Korea is 4.3 × 108 m3/year whereas total demand of agricultural water is 9.4 × 109 m3/year. Groundwater were pumped from the radial collector wells located in the upstream from the underground dams. Oksung underground dam, one representative underground dam located in Chungnam province in South Korea, irrigated approximate 3 × 105 m3 during a dried rice-planting season (between April to June) in 2017. It was three times more than usual (9 × 104 m3). Groundwater levels during the same period maintained above 5.55 m, which was slightly lower than usual (6.00 m). Results of Oksung underground dam demonstrated that underground dams in South Korea were effectively operated against drought. Recently, Korea Rural Community Corporation, a governmental institute of South Korea, plans to construct more underground dams against drought.
First Assessment of Itaipu Dam Ensemble Inflow Forecasting System
NASA Astrophysics Data System (ADS)
Mainardi Fan, Fernando; Machado Vieira Lisboa, Auder; Gomes Villa Trinidad, Giovanni; Rógenes Monteiro Pontes, Paulo; Collischonn, Walter; Tucci, Carlos; Costa Buarque, Diogo
2017-04-01
Inflow forecasting for Hydropower Plants (HPP) Dams is one of the prominent uses for hydrological forecasts. A very important HPP in terms of energy generation for South America is the Itaipu Dam, located in the Paraná River, between Brazil and Paraguay countries, with a drainage area of 820.000km2. In this work, we present the development of an ensemble forecasting system for Itaipu, operational since November 2015. The system is based in the MGB-IPH hydrological model, includes hydrodynamics simulations of the main river, and is run every day morning forced by seven different rainfall forecasts: (i) CPTEC-ETA 15km; (ii) CPTEC-BRAMS 5km; (iii) SIMEPAR WRF Ferrier; (iv) SIMEPAR WRF Lin; (v) SIMEPAR WRF Morrison; (vi) SIMEPAR WRF WDM6; (vii) SIMEPAR MEDIAN. The last one (vii) corresponds to the median value of SIMEPAR WRF model versions (iii to vi) rainfall forecasts. Besides the developed system, the "traditional" method for inflow forecasting generation for the Itaipu Dam is also run every day. This traditional method consists in the approximation of the future inflow based on the discharge tendency of upstream telemetric gauges. Nowadays, after all the forecasts are run, the hydrology team of Itaipu develop a consensus forecast, based on all obtained results, which is the one used for the Itaipu HPP Dam operation. After one year of operation a first evaluation of the Ensemble Forecasting System was conducted. Results show that the system performs satisfactory for rising flows up to five days lead time. However, some false alarms were also issued by most ensemble members in some cases. And not in all cases the system performed better than the traditional method, especially during hydrograph recessions. In terms of meteorological forecasts, some members usage are being discontinued. In terms of the hydrodynamics representation, it seems that a better information of rivers cross section could improve hydrographs recession curves forecasts. Those opportunities for improvements are currently being addressed in the system next update.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schilt, C.R.; Vu, P.D.; Nestler, J.M.
1995-12-31
At Richard B. Russell Dam on the Savannah River we have been monitoring the magnitude (numbers and masses) and species compositions as well as possible survival of fish entrained in operation of four 85 MW Francis pump turbines. In this paper we review our progress in net design for hydropower application. We also discuss basic net handling and introduce a method for net management in a very turbulent tailrace. This report is meant to share what we have learned at Russell Dam in hopes that it will facilitate similar efforts elsewhere. The commercial fishing industry has evolved methods of netmore » construction and handling that may be applied, with appropriate modification, at dams. The nets we use are most appropriately called trawls in that they have the form of a long sock placed over the penstock or draft tube. These nets are superficially similar to those used in commercial trawling for fish. Important differences are that: (1) the net remains relatively stationary while the water moves through it, not vice versa; (2) water velocities and turbulence are much greater at dams than in commercial fishing operations and (3) mesh sizes are much smaller for environmental sampling than for commercial trawling. And while a fouled trawl may stop the boat that pulls it, the water passed in generation or pumpback (about 140 ft. head at Russell) is for all practical purposes unstoppable. Our nets fish in a very turbulent discharge at 7,000 cu. ft./sec/turbine. Their strength and their ability to pass water effectively under all possible operating conditions are primary concerns. Trawl length, mesh sizes, and hanging ratios are important factors. Although we have had setbacks (usually in the form of torn nets) as this study has developed, we have incrementally improved our net design and handling. We review our net failures and the solutions we have found thus far in both construction and handling.« less
NASA Astrophysics Data System (ADS)
Podimata, Marianthi V.; Yannopoulos, Panayotis C.
2015-04-01
Water managers, decision-makers, water practitioners and others involved in Integrated Water Resources Management often encounter the problem of finding a joint agreement among stakeholders concerning the management of a common water body. Handling conflict situations/disputes over water issues and finding an acceptable joint solution remain a thorny issue in water negotiation processes, since finding a formula for wise, fair and sustainable management of a water resource is a complex process that includes environmental, economic, technical, socio-political criteria and their uncertainties. Decision Support Systems and Adaptive Management are increasingly used in that direction. To assist decision makers in handling water disputes and execute negotiations, a conceptual tool is required. The Graph Model for Conflict Resolution is a Decision Support flexible tool for negotiation support regarding water conflicts. It includes efficient algorithms for estimating strategic moves of water stakeholders, even though there is a lack of detail concerning their real motives and prospects. It calculates the stability of their states and encourages what-if analyses. This paper presents a case study of water decision makers' evaluations concerning the management of up-coming technical infrastructure Peiros-Parapeiros Dam, in Achaia Region (Greece). The continuous consultations between institutions and representatives revealed that the formation of a joint agreement between stakeholders is not easy, due to arising conflicts and contradictions regarding the jurisdiction and legal status of the dam operator and the cost undertaking of the dam operation. This paper analyzes the positions of the parties involved in the consultation process and examines possible conflict resolution states, using GMCR II. This methodology tries to minimize uncertainty to a certain extent concerning the possible moves/decisions of involved parties regarding the operation and management of the dam by developing and simulating potential strategic interactions and multilateral negotiations and finding confidence-building cooperation schemes (cooperative arrangements) over water use and management.
Impact of extreme precipitation events in the Miño-Sil river basin
NASA Astrophysics Data System (ADS)
Fernández-González, Manuel; Añel, Juan Antonio; de la Torre, Laura
2015-04-01
We herein research the impact of extreme rainfall events in the Miño-Sil basin, a heavily dammed basin located in the northwestern Iberian Peninsula. Extreme rainfall events are very important in this basin because with 106 dams it is the most dammed in Spain. These dams are almost exclusively used for hydropower generation, the installed generating capacity reaches more than 2700 MW and represents almost 9% of the total installed electrical generation capacity of the Iberian Peninsula, therefore with a potential impact on the energy market. We research the extreme events of rainfall an their return periods trying to reproduce the past extreme events of rainfall and their time periods to prove the proper functioning of the adapted model, so we can forecast future extreme events of rainfall in the basin. This research tries to optimize the storage of dams and adapt the management to problems as climate change. The results obtained are very relevant for hydroelectric generation because the operation of hydropower system depends primarily on the availability of storaged water.
18. EASTERLY VIEW ALONG THE SPILLWAY BUCKET, SHOWING CONSTRUCTION OPERATIONS.... ...
18. EASTERLY VIEW ALONG THE SPILLWAY BUCKET, SHOWING CONSTRUCTION OPERATIONS.... Volume XX, No. 5, September 5, 1940. - Prado Dam, Spillway, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoffman, Greg; Marotz, Brian L.; Dunnigan, James
''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biologicalmore » effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.« less
Factors governing sustainable groundwater pumping near a river.
Zhang, Yingqi; Hubbard, Susan; Finsterle, Stefan
2011-01-01
The objective of this paper was to provide new insights into processes affecting riverbank filtration (RBF). We consider a system with an inflatable dam installed for enhancing water production from downstream collector wells. Using a numerical model, we investigate the impact of groundwater pumping and dam operation on the hydrodynamics in the aquifer and water production. We focus our study on two processes that potentially limit water production of an RBF system: the development of an unsaturated zone and riverbed clogging. We quantify river clogging by calibrating a time-dependent riverbed permeability function based on knowledge of pumping rate, river stage, and temperature. The dynamics of the estimated riverbed permeability reflects clogging and scouring mechanisms. Our results indicate that (1) riverbed permeability is the dominant factor affecting infiltration needed for sustainable RBF production; (2) dam operation can influence pumping efficiency and prevent the development of an unsaturated zone beneath the riverbed only under conditions of sufficient riverbed permeability; (3) slow river velocity, caused by dam raising during summer months, may lead to sedimentation and deposition of fine-grained material within the riverbed, which may clog the riverbed, limiting recharge to the collector wells and contributing to the development of an unsaturated zone beneath the riverbed; and (4) higher river flow velocities, caused by dam lowering during winter storms, scour the riverbed and thus increase its permeability. These insights can be used as the basis for developing sustainable water management of a RBF system. Journal compilation © 2010 National Ground Water Association. No claim to original US government works.
Research Furthers Conservation of Grand Canyon Sandbars
Melis, Theodore S.; Topping, David J.; Rubin, David M.; Wright, Scott A.
2007-01-01
Grand Canyon National Park lies approximately 25 km (15 mi) down-river from Glen Canyon Dam, which was built on the Colorado River just south of the Arizona-Utah border in Glen Canyon National Recreation Area. Before the dam began to regulate the Colorado River in 1963, the river carried such large quantities of red sediment, for which the Southwest is famous, that the Spanish named the river the Rio Colorado, or 'red river'. Today, the Colorado River usually runs clear below Glen Canyon Dam because the dam nearly eliminates the main-channel sand supply. The daily and seasonal flows of the river were also altered by the dam. These changes have disrupted the sedimentary processes that create and maintain Grand Canyon sandbars. Throughout Grand Canyon, sandbars create habitat for native plants and animals, supply camping beaches for river runners and hikers, and provide sediment needed to protect archaeological resources from weathering and erosion. Maintenance of sandbars in the Colorado River ecosystem, the river corridor that stretches from the dam to the western boundary of Grand Canyon National Park, is a goal of the Glen Canyon Dam Adaptive Management Program. The program is a federally authorized initiative to ensure that the mandates of the Grand Canyon Protection Act of 1992 are met through advances in information and resource management. The U.S. Geological Survey's Grand Canyon Monitoring and Research Center has responsibility for scientific monitoring and research efforts for the program. Extensive research and monitoring during the past decade have resulted in the identification of possible alternatives for operating Glen Canyon Dam that hold new potential for the conservation of sand resources.
NASA Astrophysics Data System (ADS)
Snyder, N. P.; Collins, M. J.; Armistead, C. C.; Conlon, M.; David, G. C.; Lisius, G.; Lucy, C. O.; Munz, K. T.; Pearson, A.; Santaniello, D. J.
2014-12-01
Removing the Merrimack Village Dam on the lower Souhegan River (drainage area ~570 km2) in southern New Hampshire in August 2008 provided a field-scale experiment in river response to a major change in sediment flux and base level. We began monitoring the study area in August 2007, surveying a series of eight permanent cross sections within the impoundment and four downstream between the dam and the confluence with the Merrimack River (drainage area ~8,000 km2). We also surveyed the longitudinal profile through the 1-km study reach, measured bed grain size distribution, and photographed the site from ground-level stations. We conducted nine repeat surveys from 2008 to 2014, with the greatest frequency soon after dam removal. In 2012 and 2014, we also surveyed the former impoundment using low-altitude aerial photographs and structure-from-motion photogrammetry. The dam removal resulted in a near-instantaneous 3.9-m drop in base level in the impoundment. The river incised rapidly through the impounded sand and removed over 50% of it within the first two months. This added sediment load resulted in up to 3.2 m of deposition in the downstream reach. After the initial, rapid phase of channel adjustment, ongoing erosion of reservoir sediment depended primarily on flood events that could access sediment stored outside of the newly developed, active channel. By 2011, about 20% of the impounded sand remained, and this proportion was similar in the 2012 and 2014 surveys. The erosion process in the former impoundment was modulated by the recruitment of large wood (several 15-20 m tall trees with intact rootballs) from terraces through bank erosion, which remained stable in the channel and armored the banks. In the past two years, these trees have begun to be buried in newly deposited sediment, suggesting initiation of a floodplain large-wood cycle (Collins et al., 2012). At present, establishment of herbaceous vegetation on geomorphic surfaces is an important process controlling the medium-term response of the former impoundment.
State of the dam at the Zeya hydroelectric station with consideration of the geodynamic effect
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marchuk, A.N.; Dudchenko, L.N.; Bolgov, V.V.
1995-11-01
The buttress dam of the Zeya hydroelectric station has already been operating successfully for 20 years under complex climatic, geological, and seismological conditions. Additional difficulties are created by some uncertainty of the interaction of the structure with the geological environment subjected to tectonic movements. The seismotectonic conditions of the region of the Zeya reservoir are determined by proximity to the boundary of two large structural zones with a different character of tectonic movements: regions of the uplift of the Tukuringra-Soktokhan Range and the downwarping Amur-Zeya Plateau. This boundary is represented by the Pkan fault located about 1 km from themore » dam on the downstream side.« less
Collins, Brian D.; Corbett, Skye C.; Sankey, Joel B.; Fairley, Helen C.
2014-01-01
Along the Colorado River corridor between Glen Canyon Dam and Lees Ferry, Arizona, located some 25 km downstream from the dam, archaeological sites dating from 8,000 years before present through the modern era are located within and on top of fluvial and alluvial terraces of the prehistorically undammed river. These terraces are known to have undergone significant erosion and retreat since emplacement of Glen Canyon Dam in 1963. Land managers and policy makers associated with managing the flow of the Colorado River are interested in understanding how the operations of Glen Canyon Dam have affected the archeological sites associated with these terraces and how dam-controlled flows currently interact with other landscape-shaping processes. In 2012, the U.S. Geological Survey initiated a research project in Glen Canyon to study the types and causes of erosion of the terraces. This report provides the first step towards this understanding by presenting comparative analyses on several types of high-resolution topographic data (airborne lidar, terrestrial lidar, and airborne photogrammetry) that can be used in the future to document and analyze changes to terrace-based archaeological sites. Herein, we present topographic and geomorphologic data of four archaeological sites within a 14 km segment of Glen Canyon using each of the three data sources. In addition to comparing each method’s suitability for adequately representing the topography of the sites, we also analyze the data within each site’s context and describe the geomorphological processes responsible for erosion. Our results show that each method has its own strengths and weaknesses, and that terrestrial and airborne lidar are essentially interchangeable for many important topographic characterization and monitoring purposes. However, whereas terrestrial lidar provides enhanced capacity for feature recognition and gully morphology delineation, airborne methods (whether by way of laser or optical sensors) are better suited for reach- and regional-scale mapping. Our site-specific geomorphic analyses of the four archeological sites indicate that their current topographical conditions are a result of different and sometimes competing erosional agents, including bedrock- and terrace-based overland flow, fluvial-induced terrace bank collapse, and alluvial-fan-generated debris flows. Although the influences of anthropogenic-induced erosion from dam operations are not specifically analyzed in this report, we do identify geomorphic settings where dam operations are either more or less likely to affect archeological site stability. This information can be used to assist with future monitoring efforts of these sites and identification of similar conditions for other archeological sites along the Colorado River corridor in Glen Canyon.
An environmental streamflow assessment for the Santiam River basin, Oregon
Risley, John C.; Wallick, J. Rose; Mangano, Joseph F.; Jones, Krista L.
2012-01-01
The Santiam River is a tributary of the Willamette River in northwestern Oregon and drains an area of 1,810 square miles. The U.S. Army Corps of Engineers (USACE) operates four dams in the basin, which are used primarily for flood control, hydropower production, recreation, and water-quality improvement. The Detroit and Big Cliff Dams were constructed in 1953 on the North Santiam River. The Green Peter and Foster Dams were completed in 1967 on the South Santiam River. The impacts of the structures have included a decrease in the frequency and magnitude of floods and an increase in low flows. For three North Santiam River reaches, the median of annual 1-day maximum streamflows decreased 42–50 percent because of regulated streamflow conditions. Likewise, for three reaches in the South Santiam River basin, the median of annual 1-day maximum streamflows decreased 39–52 percent because of regulation. In contrast to their effect on high flows, the dams increased low flows. The median of annual 7-day minimum flows in six of the seven study reaches increased under regulated streamflow conditions between 60 and 334 percent. On a seasonal basis, median monthly streamflows decreased from February to May and increased from September to January in all the reaches. However, the magnitude of these impacts usually decreased farther downstream from dams because of cumulative inflow from unregulated tributaries and groundwater entering the North, South, and main-stem Santiam Rivers below the dams. A Wilcox rank-sum test of monthly precipitation data from Salem, Oregon, and Waterloo, Oregon, found no significant difference between the pre-and post-dam periods, which suggests that the construction and operation of the dams since the 1950s and 1960s are a primary cause of alterations to the Santiam River basin streamflow regime. In addition to the streamflow analysis, this report provides a geomorphic characterization of the Santiam River basin and the associated conceptual framework for assessing possible geomorphic and ecological changes in response to river-flow modifications. Suggestions for future biomonitoring and investigations are also provided. This study was one in a series of similar tributary streamflow and geomorphic studies conducted for the Willamette Sustainable Rivers Project. The Sustainable Rivers Project is a national effort by the USACE and The Nature Conservancy to develop environmental flow requirements in regulated river systems.
Hatten, James R.; Tiffan, Kenneth F.; Anglin, Donald R.; Haeseker, Steven L.; Skalicky, Joseph J.; Schaller, Howard
2009-01-01
Priest Rapids Dam on the Columbia River produces large daily and hourly streamflow fluctuations throughout the Hanford Reach during the period when fall Chinook salmon Oncorhynchus tshawytscha are selecting spawning habitat, constructing redds, and actively engaged in spawning. Concern over the detrimental effects of these fluctuations prompted us to quantify the effects of variable flows on the amount and persistence of fall Chinook salmon spawning habitat in the Hanford Reach. Specifically, our goal was to develop a management tool capable of quantifying the effects of current and alternative hydrographs on predicted spawning habitat in a spatially explicit manner. Toward this goal, we modeled the water velocities and depths that fall Chinook salmon experienced during the 2004 spawning season, plus what they would probably have experienced under several alternative (i.e., synthetic) hydrographs, using both one- and two-dimensional hydrodynamic models. To estimate spawning habitat under existing or alternative hydrographs, we used cell-based modeling and logistic regression to construct and compare numerous spatial habitat models. We found that fall Chinook salmon were more likely to spawn at locations where velocities were persistently greater than 1 m/s and in areas where fluctuating water velocities were reduced. Simulations of alternative dam operations indicate that the quantity of spawning habitat is expected to increase as streamflow fluctuations are reduced during the spawning season. The spatial habitat models that we developed provide management agencies with a quantitative tool for predicting, in a spatially explicit manner, the effects of different flow regimes on fall Chinook salmon spawning habitat in the Hanford Reach. In addition to characterizing temporally varying habitat conditions, our research describes an analytical approach that could be applied in other highly variable aquatic systems.
NASA Astrophysics Data System (ADS)
Giuliani, M.; Herman, J. D.; Castelletti, A.; Reed, P.
2014-04-01
This study contributes a decision analytic framework to overcome policy inertia and myopia in complex river basin management contexts. The framework combines reservoir policy identification, many-objective optimization under uncertainty, and visual analytics to characterize current operations and discover key trade-offs between alternative policies for balancing competing demands and system uncertainties. The approach is demonstrated on the Conowingo Dam, located within the Lower Susquehanna River, USA. The Lower Susquehanna River is an interstate water body that has been subject to intensive water management efforts due to competing demands from urban water supply, atomic power plant cooling, hydropower production, and federally regulated environmental flows. We have identified a baseline operating policy for the Conowingo Dam that closely reproduces the dynamics of current releases and flows for the Lower Susquehanna and thus can be used to represent the preferences structure guiding current operations. Starting from this baseline policy, our proposed decision analytic framework then combines evolutionary many-objective optimization with visual analytics to discover new operating policies that better balance the trade-offs within the Lower Susquehanna. Our results confirm that the baseline operating policy, which only considers deterministic historical inflows, significantly overestimates the system's reliability in meeting the reservoir's competing demands. Our proposed framework removes this bias by successfully identifying alternative reservoir policies that are more robust to hydroclimatic uncertainties while also better addressing the trade-offs across the Conowingo Dam's multisector services.
NASA Astrophysics Data System (ADS)
Rossi, R.; Buscombe, D.; Grams, P. E.; Schmidt, J. C.; Wheaton, J. M.
2016-12-01
Despite recent advances in the use of `Structure-from-Motion' (SfM) photogrammetry to accurately map landforms, its utility for reliably detecting and monitoring geomorphic change from repeat surveys remains underexplored in fluvial environments. It is unclear how the combination of various image acquisition platforms and techniques, survey scales, vegetation cover, and terrain complexities translate into accuracy and precision metrics for SfM-based construction of digital elevation models (DEMs) of fluvial landforms. Although unmanned aerial vehicles offer the potential to rapidly image large areas, they can be relatively costly, require skilled operators, are vulnerable in adverse weather conditions, and often rely on GPS-positioning to improve their stability. This research details image acquisition techniques for an underrepresented SfM platform: the pole-mounted camera. We highlight image acquisition and post-processing limitations of the SfM method for alluvial sandbars (10s to 100s m2) located in Marble and Grand Canyons in a remote, fluvial landscape with limited field access, strong light gradients, highly variable surface texture and limited ground control. We recommend a pole-based SfM protocol and evaluate it by comparing SfM-derived DEMs against concurrent, total station surveys. Error models of the sandbar surfaces are developed for a variety of surface characteristics (e.g., bare sand, steep slopes, and areas of shadow). The Geomorphic Change Detection (GCD) Software is used to compare SfM DEMs from before and after the 2014 high flow release from Glen Canyon Dam. Complementing existing total-station based sandbar surveys with potentially more efficient and cost-effective SfM methods will contribute to the understanding of morphodynamic responses of sandbars to high flow releases from Glen Canyon Dam. In addition, the development and implementation of a SfM-based operational method for monitoring geomorphic change will provide a methodological foundation for extending the approach to other fluvial environments.
NASA Astrophysics Data System (ADS)
Rossi, R.; Buscombe, D.; Grams, P. E.; Wheaton, J. M.
2015-12-01
Despite recent advances in the use of 'Structure-from-Motion' (SfM) photogrammetry to accurately map landforms, its utility for reliably detecting and monitoring geomorphic change from repeat surveys remains underexplored in fluvial environments. It is unclear how the combination of various image acquisition platforms and techniques, survey scales, vegetation cover, and terrain complexities translate into accuracy and precision metrics for SfM-based construction of digital elevation models (DEMs) of fluvial landforms. Although unmanned aerial vehicles offer the potential to rapidly image large areas, they can be relatively costly, require skilled operators, are vulnerable in adverse weather conditions, and often rely on GPS-positioning to improve their stability. This research details image acquisition techniques for an underrepresented SfM platform: the pole-mounted camera. We highlight image acquisition and post-processing limitations of the SfM method for alluvial sandbars (10s to 100s m2) located in Marble and Grand Canyons in a remote, fluvial landscape with limited field access, strong light gradients, highly variable surface texture and limited ground control. We recommend a pole-based SfM protocol and evaluate it by comparing SfM-derived DEMs against concurrent, total station surveys and TLS derived DEMs. Error models of the sandbar surfaces are developed for a variety of surface characteristics (e.g., bare sand, steep slopes, and areas of shadow). The Geomorphic Change Detection (GCD) Software is used to compare SfM DEMs from before and after the 2014 high flow release from Glen Canyon Dam. Complementing existing total-station based sandbar surveys with potentially more efficient and cost-effective SfM methods will contribute to the understanding of morphodynamic responses of sandbars to high flow releases from Glen Canyon Dam. In addition, the development and implementation of a SfM-based operational protocol for monitoring geomorphic change will provide a methodological foundation for extending the approach to other fluvial environments.
NASA Astrophysics Data System (ADS)
Resende, A. F. D.; Silva, T. S. F.; Silva, J. D. S.; Piedade, M. T. F.; Streher, A. S.; Ferreira-Ferreira, J.; Schongart, J.
2017-12-01
The flood pulse of large Amazonian Rivers is characterized by predictable high- and low-water periods during the annual cycle, and is the main driving force in the floodplains regulating decomposition, nutrient cycles, productivity, life cycles and growth rhythms of floodplains' biota. Over at least 20 millions of years, tree species in these ecosystems developed complex adaptative mechanisms to tolerate flooding, such as the tree species Macrolobium acaciifolium (Fabaceae) and Eschweilera tenuifolia (Lecythidaceae) occupying the lower topographic positions in the floodplain forests along the oligothrophic black-water rivers. Tree growth occurs mainly during terrestrial phase, while during the aquatic phase the anoxic conditions result into a cambial dormancy and formation of annual tree rings. The hydroelectric dam Balbina which was installed in the Uatumã River (central Amazonia) during the 1980s altered significantly the flood pulse regime resulting into higher minimum and lower maximum annual water levels. The suppression of the terrestrial phase caused large-scale mortality of flood-adapted trees growing on the lower topographic positions, as evidenced by radiocarbon dating and cross-dating techniques (dendrochronology). In this study we estimated the extension of dead forests using high resolution ALOS/PALSAR radar images, for their detection along a fluvial distance of more than 280 km downstream of the power plant. Further we analyzed tree growth of 60 living individuals of E. tenuifolia by tree-ring analyses comparing the post- and pre-dam periods. We evaluated the impacts of the altered hydrological regime on tree growth considering ontogenetic effects and the fluvial distance of the trees to the dam. Since the Balbina power plant started operating the associated igapó forests lost about 11% of its cover. We found a significant reduction of tree growth of E. tenuifolia during the post-dam period as a consequence of the increasing aquatic phase duration. This impact was stronger for younger trees (<200 yr) and for those growing closer to the hydroelectric dam (<100 km distance). Considering the planning of construction of several dozen dams in the Amazon there is an urgent need to consider these downstream impacts in all discussions of hydroelectric power plants implementation and operation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hanrahan, T.P.
2009-01-08
The Bonneville Power Administration (BPA) Project 2003-038-00, Evaluate the restoration potential of Snake River fall Chinook salmon spawning habitat, began in FY04 (15 December 2003) and continues into FY06. This status report is intended to summarize accomplishments during FY04 and FY05. Accomplishments are summarized by Work Elements, as detailed in the Statement of Work (see BPA's project management database PISCES). This project evaluates the restoration potential of mainstem habitats for fall Chinook salmon. The studies address two research questions: 'Are there sections not currently used by spawning fall Chinook salmon within the impounded lower Snake River that possess the physicalmore » characteristics for potentially suitable fall Chinook spawning habitat?' and 'Can hydrosystem operations affecting these sections be adjusted such that the sections closely resemble the physical characteristics of current fall Chinook salmon spawning areas in similar physical settings?' Efforts are focused at two study sites: (1) the Ice Harbor Dam tailrace downstream to the Columbia River confluence, and (2) the Lower Granite Dam tailrace. Our previous studies indicated that these two areas have the highest potential for restoring Snake River fall Chinook salmon spawning habitat. The study sites will be evaluated under existing structural configurations at the dams (i.e., without partial removal of a dam structure), and alternative operational scenarios (e.g., varying forebay/tailwater elevations). The areas studied represent tailwater habitat (i.e., riverine segments extending from a dam downstream to the backwater influence from the next dam downstream). We are using a reference site, indicative of current fall Chinook salmon spawning areas in tailwater habitat, against which to compare the physical characteristics of each study site. The reference site for tailwater habitats is the section extending downstream from the Wanapum Dam tailrace on the Columbia River. Escapement estimates for fall of 2000 indicate more than 9000 adult fall Chinook salmon returned to this area, accounting for more than 2100 redds within a 5 km section of river.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hawkes, Lynette A.; Martinson, Rick D.; Smith, W. William
1992-04-01
The 1991 smolt monitoring project of the National Marine Fisheries Service provided data on the seaward migration of juvenile salmon and steelhead at John Day, The Dalles and Bonneville Dams. All pertinent fish capture and condition data as well as dam operations and river flow data were provided to Fish Passage Center for use in developing fish passage indices and migration timing, and for water budget and spill management.
Solomon Gulch hydroelectric project takes shape
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The planning and current construction activities for the Solomon Gulch hydroelectric plant near Valdez, Alaska which is scheduled for dam completion in 1980 and power plant operation in 1981 are discussed. The main dam will be 115 ft high and 360 ft wide. The two paralled 48-in. dia penstocks will be constructed from surplus pipe left over from the Alaska pipeline project. Construction on the 12 MW plant began in October 1978. (LCL)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Gary E.; Skalski, J. R.; Carlson, Thomas J.
The acoustic telemetry study reported here was conducted by researchers at Pacific Northwest National Laboratory (PNNL) and the University of Washington (UW) for the U.S. Army Corps of Engineers, Portland District (USACE). The purpose of the study was to estimate dam passage survival and other performance measures for yearling and subyearling Chinook salmon and steelhead at The Dalles Dam as stipulated by the 2008 Biological Opinion on operation of the Federal Columbia River Power System (FCRPS) and 2008 Columbia Basin Fish Accords.
Side-scan sonar imaging of the Colorado River, Grand Canyon
Anima, Roberto; Wong, Florence L.; Hogg, David; Galanis, Peter
2007-01-01
This paper presents data collection methods and side-scan sonar data collected along the Colorado River in Grand Canyon in August and September of 2000. The purpose of the data collection effort was to image the distribution of sand between Glen Canyon Dam and river mile 87.4 before and after the 31,600 cfs flow of September 6-8. The side-scan sonar imaging focused on pools between rapids but included smaller rapids where possible.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... hazards associated with the U.S. Army Corps of Engineers Electromagnetic Fields evaluation operations... Michigan has determined that the U.S. Army Corps of Engineers Electromagnetic Fields evaluation operations...
Rimayi, Cornelius; Odusanya, David; Weiss, Jana M; de Boer, Jacob; Chimuka, Luke
2018-06-15
A quantitative assessment of pollutants of emerging concern in the Hartbeespoort Dam catchment area was conducted using liquid chromatography-tandem mass spectrometry (LC-MS/MS) to establish the occurrence, source and distribution of 15 environmental pollutants, including 10 pharmaceuticals, 1 pesticide and 4 steroid hormones. Seasonal sampling was conducted in the Hartbeespoort Lake using sub-surface grab sampling to determine the lake's ecological status and obtain data for establishment of progressive operational monitoring. The Jukskei River, which lies upstream of the Hartbeespoort Dam, was sampled in the winter season. Five year old carp (Cyprinus carpio) and catfish (Clarias gariepinus) were also sampled from the Hartbeespoort Dam to study bioaccumulation in biota as well as to estimate risk associated with fish consumption. In the Jukskei River, the main source of 11 emerging pollutants (EPs) was identified as raw sewage overflow, with the highest ∑11 EP concentration of 593ngL -1 being recorded at the Midrand point and the lowest ∑11 EP concentration of 164ngL -1 at the N14 site located 1km downstream of a large wastewater treatment plant. The Jukskei River was found to be the largest contributor of the emerging contaminants detected in the Hartbeespoort Dam. In the Hartbeespoort Dam EP concentrations were generally in the order efavirenz>nevirapine>carbamazepine>methocarbamol>bromacil>venlafaxine. Water and sediment were sampled from the uMngeni River estuary within 24h after large volumes of an assortment of pharmaceutical waste had been discovered to be washed into the river estuary after flash rainfall on 18 May 2016. Analytical results revealed high levels of some emerging pollutants in sediment samples, up to 81ngg -1 for nevirapine and 4ngg -1 for etilefrine HCL. This study shows that efavirenz, nevirapine, carbamazepine, methocarbamol, bromacil and venlafaxine are contaminants that require operational monitoring in South African urban waters. Copyright © 2018. Published by Elsevier B.V.
Ex post power economic analysis of record of decision operational restrictions at Glen Canyon Dam.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Veselka, T. D.; Poch, L. A.; Palmer, C. S.
On October 9, 1996, Bruce Babbitt, then-Secretary of the U.S. Department of the Interior signed the Record of Decision (ROD) on operating criteria for the Glen Canyon Dam (GCD). Criteria selected were based on the Modified Low Fluctuating Flow (MLFF) Alternative as described in the Operation of Glen Canyon Dam, Colorado River Storage Project, Arizona, Final Environmental Impact Statement (EIS) (Reclamation 1995). These restrictions reduced the operating flexibility of the hydroelectric power plant and therefore its economic value. The EIS provided impact information to support the ROD, including an analysis of operating criteria alternatives on power system economics. This exmore » post study reevaluates ROD power economic impacts and compares these results to the economic analysis performed prior (ex ante) to the ROD for the MLFF Alternative. On the basis of the methodology used in the ex ante analysis, anticipated annual economic impacts of the ROD were estimated to range from approximately $15.1 million to $44.2 million in terms of 1991 dollars ($1991). This ex post analysis incorporates historical events that took place between 1997 and 2005, including the evolution of power markets in the Western Electricity Coordinating Council as reflected in market prices for capacity and energy. Prompted by ROD operational restrictions, this analysis also incorporates a decision made by the Western Area Power Administration to modify commitments that it made to its customers. Simulated operations of GCD were based on the premise that hourly production patterns would maximize the economic value of the hydropower resource. On the basis of this assumption, it was estimated that economic impacts were on average $26.3 million in $1991, or $39 million in $2009.« less
Deschutes estuary feasibility study: hydrodynamics and sediment transport modeling
George, Douglas A.; Gelfenbaum, Guy; Lesser, Giles; Stevens, Andrew W.
2006-01-01
- Provide the completed study to the CLAMP Steering Committee so that a recommendation about a long-term aquatic environment of the basin can be made. The hydrodynamic and sediment transport modeling task developed a number of different model simulations using a process-based morphological model, Delft3D, to help address these goals. Modeling results provide a qualitative assessment of estuarine behavior both prior to dam construction and after various post-dam removal scenarios. Quantitative data from the model is used in the companion biological assessment and engineering design components of the overall study. Overall, the modeling study found that after dam removal, tidal and estuarine processes are immediately restored, with marine water from Budd Inlet carried into North and Middle Basin on each rising tide and mud flats being exposed with each falling tide. Within the first year after dam removal, tidal processes, along with the occasional river floods, act to modify the estuary bed by redistributing sediment through erosion and deposition. The morphological response of the bed is rapid during the first couple of years, then slows as a dynamic equilibrium is reached within three to five years. By ten years after dam removal, the overall hydrodynamic and morphologic behavior of the estuary is similar to the pre-dam estuary, with the exception of South Basin, which has been permanently modified by human activities. In addition to a qualitative assessment of estuarine behavior, process-based modeling provides the ability address specific questions to help to inform decision-making. Considering that predicting future conditions of a complex estuarine environment is wrought with uncertainties, quantitative results in this report are often expressed in terms of ranges of possible outcomes.
Jenkins, Kurt J.; Chelgren, Nathan; Sager-Fradkin, K.A.; Happe, P.J.; Adams, Michael J.
2015-01-01
The downstream transport of sediments and organics and upstream migration of anadromous fishes are key ecological processes in unregulated riverine ecosystems of the North Pacific coast, but their influence on wildlife habitats and populations is poorly documented. Removal of two large hydroelectric dams in Washington’s Elwha Valley provides an unprecedented opportunity to study long-term responses of wildlife populations to dam removal and restoration of these key ecological processes. We compared pre-dam removal patterns in the relative abundance and occupancy of mesocarnivores, small mammals and lentic amphibians of the Elwha River riparian zone above, between and below the dams. Occupancy of riparian habitats by three mesocarnivore species diminished upriver but did not appear to be closely linked with the absence of salmon in the upper river. Although the importance of salmon in the lower river cannot be discounted, other gradients in food resources also likely contributed to observed distribution patterns of mesocarnivores. Abundance and occupancy patterns within congeneric pairs of new world mice (Peromyscus spp.) and shrews (Sorex spp.) indicated that closely related species were negatively associated with each other and responded to habitat gradients in the riparian zone. The availability of lentic habitats of amphibians was highly variable, and occupancy was low as a result of rapidly changing flows during the larval development period. We speculate that long-term changes in habitat conditions and salmon availability following dam removal will elicit long-term changes in distribution of mesocarnivores, small mammals and amphibians. Long-term monitoring will enhance understanding of the role of fish and restored ecosystem processes on wildlife communities along salmon-bearing rivers in the region.
Stakeout surveys for check dams in gullied areas by using the FreeXSap photogrammetric method
NASA Astrophysics Data System (ADS)
Castillo, Carlos; Marín-Moreno, Víctor; Taguas, Encarnación V.
2017-04-01
Prior to any check dam construction work, it is necessary to carry out field stakeout surveys to define the layout of the dam series according to spacing criteria. While in expensive and complex settings, accurate measurement techniques might be justified (e.g. differential GPS), for small to medium-sized check dams typical of areas affected by gully erosion, simpler methodologies might be more cost-efficient. Innovative 3D photogrammetric techniques based on Structure-from-Motion (SfM) algorithms have proved to be useful across different geomorphological applications and have been successfully applied for gully assessment. In this communication, we present an efficient methodology consisting of the application of a free interface for photogrammetric reconstruction (FreeXSap) combined with simple distance measurements to obtain channel cross-sections determining the width and height of the check dam for a particular cross-section. We will illustrate its use for a hundred-meter-long gully under conventional agriculture in Córdoba (Spain). FreeXSap is an easy-to-use graphical user interface written in Matlab Code (Mathworks, 2016) for the reconstruction of 3D models from image sets taken with digital consumer-grade cameras. The SfM algorithms are based on MicMac scripts (Pierrot-Deseilligny and Cléry, 2011) along with routines specifically developed for the orientation, determination and geometrical analysis of cross-sections. It only requires the collection of a few pictures of a channel cross-section (normally below 5) by the camera operator to build an accurate 3D model, while a second operator holds a pole in vertical position (with the help of a bubble level attached to the pole) in order to provide orientation and scale for further processing. The spacing between check dams was determined using the head-to-toe rule by using a clinometer App on a Smartphone. In this work we will evaluate the results of the application of this methodology in terms of time and cost requirements and the capabilities and operation procedure of FreeXSap will be presented. This tool will be available for free download. REFERENCES Pierrot-Deseilligny, M and Cléry, I. APERO, an Open Source Bundle Adjusment Software for Automatic Calibration and Orientation of a Set of Images. Proceedings of the ISPRS Commission V Symposium, Image Engineering and Vision Metrology, Trento, Italy, 2-4 March 2011.
NASA Astrophysics Data System (ADS)
Tessari, G.; Riccardi, P.; Pasquali, P.
2017-12-01
Monitoring of dam structural health is an important practice to control the structure itself and the water reservoir, to guarantee efficient operation and safety of surrounding areas. Ensuring the longevity of the structure requires the timely detection of any behaviour that could deteriorate the dam and potentially result in its shutdown or failure.The detection and monitoring of surface displacements is increasingly performed through the analysis of satellite Synthetic Aperture Radar (SAR) data, thanks to the non-invasiveness of their acquisition, the possibility to cover large areas in a short time and the new space missions equipped with high spatial resolution sensors. The availability of SAR satellite acquisitions from the early 1990s enables to reconstruct the historical evolution of dam behaviour, defining its key parameters, possibly from its construction to the present. Furthermore, the progress on SAR Interferometry (InSAR) techniques through the development of Differential InSAR (DInSAR) and Advanced stacking techniques (A-DInSAR) allows to obtain accurate velocity maps and displacement time-series.The importance of these techniques emerges when environmental or logistic conditions do not allow to monitor dams applying the traditional geodetic techniques. In such cases, A-DInSAR constitutes a reliable diagnostic tool of dam structural health to avoid any extraordinary failure that may lead to loss of lives.In this contest, an emblematic case will be analysed as test case: the Mosul Dam, the largest Iraqi dam, where monitoring and maintaining are impeded for political controversy, causing possible risks for the population security. In fact, it is considered one of the most dangerous dams in the world because of the erosion of the gypsum rock at the basement and the difficult interventions due to security problems. The dam consists of 113 m tall and 3.4 km long earth-fill embankment-type, with a clay core, and it was completed in 1984.The deformation fields obtained from SAR data are evaluated to assess the temporal evolution of the strains affecting the structure. Obtained results represent the preliminary stage of a multidisciplinary project, finalized to assess possible damages affecting a dam through remote sensing and civil engineering surveys.
Investigation on trophic state index by artificial neural networks (case study: Dez Dam of Iran)
NASA Astrophysics Data System (ADS)
Saghi, H.; Karimi, L.; Javid, A. H.
2015-06-01
Dam construction and surface runoff control is one of the most common approaches for water-needs supply of human societies. However, the increasing development of social activities and hence the subsequent increase in environmental pollutants leads to deterioration of water quality in dam reservoirs and eutrophication process could be intensified. So, the water quality of reservoirs is now one of the key factors in operation and water quality management of reservoirs. Hence, maintaining the quality of the stored water and identification and examination of changes along time has been a constant concern of humans that involves the water authorities. Traditionally, empirical trophic state indices of dam reservoirs often defined based on changes in concentration of effective factors (nutrients) and its consequences (increase in chlorophyll a), have been used as an efficient tool in the definition of dam reservoirs quality. In recent years, modeling techniques such as artificial neural networks have enhanced the prediction capability and the accuracy of these studies. In this study, artificial neural networks have been applied to analyze eutrophication process in the Dez Dam reservoir in Iran. In this paper, feed forward neural network with one input layer, one hidden layer and one output layer was applied using MATLAB neural network toolbox for trophic state index (TSI) analysis in the Dez Dam reservoir. The input data of this network are effective parameters in the eutrophication: nitrogen cycle parameters and phosphorous cycle parameters and parameters that will be changed by eutrophication: Chl a, SD, DO and the output data is TSI. Based on the results from estimation of modified Carlson trophic state index, Dez Dam reservoir is considered to be eutrophic in the early July to mid-November and would be mesotrophic with decrease in temperature. Therefore, a decrease in water quality of the dam reservoir during the warm seasons is expectable. The results indicated that artificial neural network (ANN) is a suitable tool for quality modeling of reservoir of dam and increment and decrement of nutrients in trend of eutrophication. Therefore, ANN is a suitable tool for quality modeling of reservoir of dam.
28. DOWNSTREAM VIEW OF ROCK PAVING OPERATIONS ON LEFT BANK ...
28. DOWNSTREAM VIEW OF ROCK PAVING OPERATIONS ON LEFT BANK OF OUTLET CHANNEL.... Volume XVI, No. 18, September 29, 1939. - Prado Dam, Outlet Works, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-20
... associated with the U.S. Army Corps of Engineers Electromagnetic Fields evaluation operations. During any of... has determined that the U.S. Army Corps of Engineers Electromagnetic Fields evaluation operation poses...
Code of Federal Regulations, 2011 CFR
2011-07-01
... and harbor purposes. These include the construction, operation, maintenance and improvement of both... United States, all lands, easements and rights-of-way required for initial construction, operation and...-1), authorizes the acquisition of land and interests therein for dam and reservoir projects, channel...
Code of Federal Regulations, 2010 CFR
2010-07-01
... and harbor purposes. These include the construction, operation, maintenance and improvement of both... United States, all lands, easements and rights-of-way required for initial construction, operation and...-1), authorizes the acquisition of land and interests therein for dam and reservoir projects, channel...
Hydropower generation, flood control and dam cascades: A national assessment for Vietnam
NASA Astrophysics Data System (ADS)
Nguyen-Tien, Viet; Elliott, Robert J. R.; Strobl, Eric A.
2018-05-01
Vietnam is a country with diverse terrain and climatic conditions and a dependency on hydropower for a significant proportion of its power needs and as such, is particularly vulnerable to changes in climate. In this paper we apply SWAT (Soil and Water Assessment Tool) derived discharge simulation results coupled with regression analysis to estimate the performance of hydropower plants for Vietnam between 1995 and mid-2014 when both power supply and demand increased rapidly. Our approach is to examine the watershed formed from three large inter-boundary basins: The Red River, the Vietnam Coast and the Lower Mekong River, which have a total area of 977,964 km2. We then divide this area into 7,887 sub-basins with an average area of 131.6 km2 (based on level 12 of HydroSHEDS/HydroBASINS datasets) and 53,024 Hydrological Response Units (HRUs). Next we simulate river flow for the 40 largest hydropower plants across Vietnam. Our validation process demonstrates that the simulated flows are significantly correlated with the gauged inflows into these dams and are able to serve as a good proxy for the inflows into hydropower dams in our baseline energy regression, which captures 87.7% of the variation in monthly power generation. In other results we estimate that large dams sacrifice on average around 18.2% of their contemporaneous production for the purpose of flood control. When we assess Vietnam's current alignment of dams we find that the current cascades of large hydropower dams appear to be reasonably efficient: each MWh/day increase in upstream generation adds 0.146 MWh/day to downstream generation. The study provides evidence for the multiple benefits of a national system of large hydropower dams using a cascade design. Such a system may help overcome future adverse impacts from changes in climate conditions. However, our results show that there is still room for improvement in the harmonization of cascades in some basins. Finally, possible adverse hydro-ecological impacts due to the proliferation of large upstream dams, including those located beyond Vietnam's border, need to be carefully considered.
1981-03-01
Operating Facilities 10 4.4 Description of Any Warning System in Effect 10 4.5 Evaluation 10 SECTION 5 - HIDRAULIC /HYDROLOGIC 5.1 Evaluation of Features 11...Hm + 1/4L Y) A = 1/2 T (2d -A Y)c Q = (A 3 g/T) 0 .5 where: d = critical depth (feet) H c = available specific energy which is taken to be the heightm
Code of Federal Regulations, 2012 CFR
2012-07-01
... Lk KS Mitchel Solomon R FIM 722.3204.8 1488.31455.6 1455.61428.0 3368212602 126023341 PL 78-534PL 79....34051.0 137309410 9410820 PL 78-534 USBR. Kirwin Dam & Res KS Phillips N Fork Solomon R FICR 215.189.6... 1330 890 PL 78-534 VT Webster Dam & Res KS Rocks S Fork Solomon R FIRC 183.472.1 1923.71892.5 1892...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Lk KS Mitchel Solomon R FIM 722.3204.8 1488.31455.6 1455.61428.0 3368212602 126023341 PL 78-534PL 79....34051.0 137309410 9410820 PL 78-534 USBR. Kirwin Dam & Res KS Phillips N Fork Solomon R FICR 215.189.6... 1330 890 PL 78-534 VT Webster Dam & Res KS Rocks S Fork Solomon R FIRC 183.472.1 1923.71892.5 1892...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Lk KS Mitchel Solomon R FIM 722.3204.8 1488.31455.6 1455.61428.0 3368212602 126023341 PL 78-534PL 79....34051.0 137309410 9410820 PL 78-534 USBR. Kirwin Dam & Res KS Phillips N Fork Solomon R FICR 215.189.6... 1330 890 PL 78-534 VT Webster Dam & Res KS Rocks S Fork Solomon R FIRC 183.472.1 1923.71892.5 1892...
1984-08-01
Mississippi River. 91 o In the event that the existing licensee, Ford Motor Company , or another non-Federal entity does not apply to FERC for rights to...interests. The existing hydropower plant and equipment are owned and operated by the Ford Motor Company . The existing four turbines generate a combined...Turbines (Ford Motor Company ) 51 Right (West) Abutment 51 Preliminary Screening of Alternatives 51 Conclusions of the Preliminary Comparative Review 53
Hydrological Analysis for Inflow Forecasting into Temengor Dam
NASA Astrophysics Data System (ADS)
Najid, MI; Sidek, LM; Hidayah, B.; Roseli, ZA
2016-03-01
These days, natural disaster such as flood is the main concern for hydrologists. One of solutions in understanding the reason of flood is by prediction of the event sooner than normal occurrence. One of the criteria is lead time or travel time that is important in the study of fresh waters and flood events. Therefore, estimation of lead or travel time for flood event can be beneficial primary information. The objective of this study is to estimate the lead time or travel time for outlet of Temengor dam in Malaysia. Tenaga Nasional Berhad (TNB) Sungai Perak dam operation has the main contribution on decision support for early water released and flood warning to authorities and locals resident for in the down streams area. For this study, hydrological analysis carried out will help to determine which years that give more rainfall contribution into the reservoir. Rainfall contribution of reservoir help to understanding rainfall distribution and peak discharge on that period. It also help for calibration of forecasting model system for better accuracy of flood hydrograph. There may be various methods to determine the rainfall contribution of catchment. The result has shown that, the rainfall contribution for Temengor catchment, is more on November in each year which is the monsoon season in Malaysia. TNB dam operational decision support systems can prepare and be more aware at this time for flood control and flood mitigation.
Kock, Tobias J.; Tiffan, Kenneth F.; Connor, William P.
2007-01-01
During the winter of 2006-07, we radio and passive integrated transponder (PIT) tagged, and released 99 juvenile fall Chinook salmon to evaluate over-wintering behavior and dam passage in the lower Snake River, Washington. All fish were released 10 km upstream of Lower Granite Dam at Granite Point in early November, 2006. Fixed radio telemetry detection sites located in the forebay and tailrace areas of Lower Granite, Little Goose, Lower Monumental, Ice Harbor, Bonneville dams, and at Lyle, Washington were used to monitor fish movements and dam passage through early-May 2007. Of the 99 fish released during our study, 80 passed Lower Granite Dam and were detected at downstream detection sites, 37 passed Little Goose Dam, 41 passed Lower Monumental Dam, 31 passed Ice Harbor Dam, 18 passed Lyle, WA, and 13 passed Bonneville Dam. Of the fish that passed Lower Granite Dam in the fall, 63 fish did so during the extended bypass period from November 1 through December 16. Of these fish, 53 were also detected by the PIT-tag interrogation system. Fifteen of the fish that passed Lower Granite Dam in the fall continued to pass lower Snake River dams and exit the system by the end of January. The remaining fish either died, their tags failed, or they resided in Little Goose Reservoir until spring when relatively few continued their seaward migration. Passage of tagged fish past lower Snake River dams generally declined during the winter as temperatures decreased, but increased again in the spring as temperatures and flows increased. Fish residence times in reservoirs and forebays was lengthy during the winter (up to 160 d), and varied by reservoir and time of year. We observed no diel trends in fish passage. Very few fish were detected at PIT-tag interrogation sites in the spring compared to detection by radio telemetry detection sites indicating that fish may have passed via spill. We believe that passage of overwintering juvenile fall Chinook salmon during winter is due more to chance than directed downstream movement. Since the primary route of passage during the winter is through powerhouse turbines, the potential exists for increased mortality for over-wintering juvenile fall Chinook salmon in the Snake River. Our findings that some fish can pass undetected during the winter likely bias traditional smolt-to-adult return rate calculations that are typically used to measure the success of juvenile transportation studies.
Analysis of the hydrological safety of dams combining two numerical tools: Iber and DualSPHysics
NASA Astrophysics Data System (ADS)
González-Cao, J.; García-Feal, O.; Domínguez, J. M.; Crespo, A. J. C.; Gómez-Gesteira, M.
2018-02-01
The upgrade of the hydrological safety of dams is a critical issue to avoid failures that can dramatically affect people and assets. This paper shows a numerical methodology to analyse the safety of the Belesar dam (NW, Spain) based on two different numerical codes. First, a mesh-based code named Iber, suited to deal with large 2-D domains, is used to simulate the impoundment. The initial conditions and the inlet provided to Iber correspond to the maximum water elevation and the maximum expected inflow to the impoundment defined in the technical specifications of the dam, which are associated to the more hazardous operation conditions of the dam. Iber provides information about the time needed for water to attain the crest of the dam when floodgates are closed. In addition, it also provides the velocity of discharge when gates are opened. Then, a mesh-free code named DualSPHysics, which is especially suited to deal with complex and violent 3-D flows, is used to reproduce the behaviour of one of the spillways of the dam starting from the results obtained with Iber, which are used as inlet conditions for DualSPHysics. The combined results of both model show that the left spillway can discharge the surplus of water associated to the maximum inflow to the reservoir if the gates of the spillways are opened before the overtopping of the dam was observed. In addition, water depth measured on the spillway is considerably lower than the lateral walls, preventing overtopping. Finally, velocities at different points of the spillway showed to be in good agreement with theoretical values.
1981-08-01
and the reservoir spillway located in Schaghticoke. The dam has a drainage area of 67 square miles, which is characterized by wooded and agricultural...e____ Aie A. Lct LcA t .?t*fCL L C A 35.0 * Or L ,l! 5.9,5 34$ . ig lo. 11 vW{ OOA.. I .1W .4OL zA 4 -1Y\\’ 0 4 ~~~~.7 0A’.t4 bQ Q * L’~’c 4 SSTETSON...adktional operating space. The existing wood roof shows evidence of dry rot and should be replaced. In connection with the roof replacement, hoisting
Allawi, Mohammed Falah; Jaafar, Othman; Mohamad Hamzah, Firdaus; Abdullah, Sharifah Mastura Syed; El-Shafie, Ahmed
2018-05-01
Efficacious operation for dam and reservoir system could guarantee not only a defenselessness policy against natural hazard but also identify rule to meet the water demand. Successful operation of dam and reservoir systems to ensure optimal use of water resources could be unattainable without accurate and reliable simulation models. According to the highly stochastic nature of hydrologic parameters, developing accurate predictive model that efficiently mimic such a complex pattern is an increasing domain of research. During the last two decades, artificial intelligence (AI) techniques have been significantly utilized for attaining a robust modeling to handle different stochastic hydrological parameters. AI techniques have also shown considerable progress in finding optimal rules for reservoir operation. This review research explores the history of developing AI in reservoir inflow forecasting and prediction of evaporation from a reservoir as the major components of the reservoir simulation. In addition, critical assessment of the advantages and disadvantages of integrated AI simulation methods with optimization methods has been reported. Future research on the potential of utilizing new innovative methods based AI techniques for reservoir simulation and optimization models have also been discussed. Finally, proposal for the new mathematical procedure to accomplish the realistic evaluation of the whole optimization model performance (reliability, resilience, and vulnerability indices) has been recommended.
Jung, Kwang-Wook; Yoon, Choon-G; Jang, Jae-Ho; Kong, Dong-Soo
2008-01-01
Effective watershed management often demands qualitative and quantitative predictions of the effect of future management activities as arguments for policy makers and administration. The BASINS geographic information system was developed to compute total maximum daily loads, which are helpful to establish hydrological process and water quality modeling system. In this paper the BASINS toolkit HSPF model is applied in 20,271 km(2) large watershed of the Han River Basin is used for applicability of HSPF and BMPs scenarios. For proper evaluation of watershed and stream water quality, comprehensive estimation methods are necessary to assess large amounts of point source and nonpoint-source (NPS) pollution based on the total watershed area. In this study, The Hydrological Simulation Program-FORTRAN (HSPF) was estimated to simulate watershed pollutant loads containing dam operation and applied BMPs scenarios for control NPS pollution. The 8-day monitoring data (about three years) were used in the calibration and verification processes. Model performance was in the range of "very good" and "good" based on percent difference. The water-quality simulation results were encouraging for this large sizable watershed with dam operation practice and mixed land uses; HSPF proved adequate, and its application is recommended to simulate watershed processes and BMPs evaluation. IWA Publishing 2008.
Adams, Noah S.; Hatton, Tyson W.
2012-01-01
Passage and survival data for yearling and subyearling Chinook salmon and juvenile steelhead were collected at McNary Dam between 2006 and 2009. These data have provided critical information for resource managers to implement structural and operational changes designed to improve the survival of juvenile salmonids as they migrate past the dam. Much of the information collected at McNary Dam was in the form of three-dimensional tracks of fish movements in the forebay. These data depicted the behavior of multiple species (in three dimensions) during different diel periods, spill conditions, powerhouse operations, and test configurations of the surface bypass structures (temporary spillway weirs; TSWs). One of the challenges in reporting three-dimensional results is presenting the information in a manner that allows interested parties to summarize the behavior of many fish over many different conditions across multiple years. To accomplish this, we investigated the feasibility of using a Markov chain analysis to characterize fish movement patterns in the forebay of McNary Dam. The Markov chain analysis is one way that can be used to summarize numerically the behavior of fish in the forebay. Numerically summarizing the behavior of juvenile salmonids in the forebay of McNary Dam using the Markov chain analysis allowed us to confirm what had been previously summarized using visualization software. For example, proportions of yearling and subyearling Chinook salmon passing the three powerhouse areas was often greater in the southern and middle areas, compared to the northern area. The opposite generally was observed for steelhead. Results of this analysis also allowed us to confirm and quantify the extent of milling behavior that had been observed for steelhead. For fish that were first detected in the powerhouse region, less than 0.10 of the steelhead, on average, passed within each of the powerhouse areas. Instead, steelhead transitioned to adjoining areas in the spillway before passing the dam. In comparison, greater than 0.20 of the Chinook salmon passed within the powerhouse areas. Less milling behavior was observed for all species for fish that first approached the spillway. Compared to the powerhouse areas, a higher proportion of fish, regardless of species, passed the spillway areas and fewer transitioned to adjoining areas in the powerhouse. In addition to quantifying what had been previously speculated about the behavior of fish in the forebay of McNary Dam, the Markov chain analysis refined our understanding of how fish behavior and passage can be influenced by changes to the operations and structure of McNary Dam. For example, the addition of TSWs to the spillway area clearly influenced the passage of fish. Previous results have been reported showing that TSWs increased the number of fish passing through non-turbine routes and the fish-track videos indicated, in general, how fish behaved before passing through the TSWs. However, the analysis presented in this report allowed us to better understand how fish moved across the face of the dam before passing the TSWs and provided a way to quantify the effect of TSW location. Installation of the TSWs in bays 22 and 20 clearly increased passage proportions through the southern one-third of the spillway area for all species, most significantly for steelhead. When the TSWs were moved to bays 19 and 20 in 2008, overall passage through the southern one-third of the spillway remained higher than 2006, but decreased from what was observed in 2007. Shifting the TSWs to the north decreased the proportion of fish passing through the TSWs and increased the number of fish that moved to adjoining areas before passing the dam. Perhaps the most interesting new information to come out of the two-step Markov chain analysis relates to how the performance of the TSWs was influenced by their proximity to the powerhouse. During 2007, the highest proportion of fish passing through TSW22 was for fish that transitioned from the powerhouse area. In contrast, a relatively low proportion of fish passed through TSW20 after coming from the powerhouse area. Instead, the proportion of fish that passed TSW20 after coming from the northern part of the spillway was twice as high as the proportion of fish that passed through TSW20 after coming from the powerhouse. During 2008, the TSW in bay 22 was moved to bay 19, leaving the TSW in bay 20 as the one closest to the powerhouse. As was the case when a TSW was located in bay 22; the proportion of fish passing TSW20 after coming from the powerhouse was greater than the proportion of fish passing through TSW20 after coming from the northern part of the spillway. Passage proportions for fish passing through TSW19, the farthest north of the two TSWs during 2008, was higher for fish that came from the northern part of the spillway compared to the proportion of fish that passed through TSW19 after coming from the powerhouse. The Markov chain analysis provided a mathematical way to characterize fish behavior in the forebay of McNary Dam and helped refine our understanding of how fish movements were influenced by operational and structural changes at McNary Dam. The Markov chain analysis also could be used to examine how future structural and operational changes proposed for McNary Dam might influence the passage of juvenile salmonids.
The Glen Canyon Dam adaptive management program: progress and immediate challenges
Hamill, John F.; Melis, Theodore S.; Boon, Philip J.; Raven, Paul J.
2012-01-01
Adaptive management emerged as an important resource management strategy for major river systems in the United States (US) in the early 1990s. The Glen Canyon Dam Adaptive Management Program (‘the Program’) was formally established in 1997 to fulfill a statutory requirement in the 1992 Grand Canyon Protection Act (GCPA). The GCPA aimed to improve natural resource conditions in the Colorado River corridor in the Glen Canyon National Recreation Area and Grand Canyon National Park, Arizona that were affected by the Glen Canyon dam. The Program achieves this by using science and a variety of stakeholder perspectives to inform decisions about dam operations. Since the Program started the ecosystem is now much better understood and several biological and physical improvements have been achieved. These improvements include: (i) an estimated 50% increase in the adult population of endangered humpback chub (Gila cypha) between 2001 and 2008, following previous decline; (ii) a 90% decrease in non-native rainbow trout (Oncorhynchus mykiss), which are known to compete with and prey on native fish, as a result of removal experiments; and (iii) the widespread reappearance of sandbars in response to an experimental high-flow release of dam water in March 2008.Although substantial progress has been made, the Program faces several immediate challenges. These include: (i) defining specific, measurable objectives and desired future conditions for important natural, cultural and recreational attributes to inform science and management decisions; (ii) implementing structural and operational changes to improve collaboration among stakeholders; (iii) establishing a long-term experimental programme and management plan; and (iv) securing long-term funding for monitoring programmes to assess ecosystem and other responses to management actions. Addressing these challenges and building on recent progress will require strong and consistent leadership from the US Department of the Interior officials who guide the Program.
Storage capacity and sedimentation trends of Lago Garzas, Puerto Rico, 1996-2007
Soler-Lopez, L.R.
2012-01-01
Lago Garzas is located in west-central Puerto Rico, about 3.5 kilometers southwest of the town of Adjuntas, in the confluence of the Río Vacas and three other unnamed tributaries (fig. 1). The dam is owned and operated by the Puerto Rico Electric Power Authority (PREPA), and was constructed in 1943 for hydroelectric power generation and municipal water use along the southern coast. The dam is a semi-hydraulic earthfill embankment lined with boulders, and has a height of 61.57 meters, a top width of 9.14 meters, a base width of 365.76 meters, and a crest length of 227.37 meters; State Road PR-518 crosses the top of the dam. A morning-glory-type spillway is located near the west abutment of the dam at an elevation of 736.12 meters above mean sea level (Puerto Rico Water Resources Authority, 1969). Figure 2 shows an aerial photograph of the Lago Garzas earthfill dam and the morning-glory spillway section. Additional information and operational procedures are provided in Soler-López and others (1999). During July 17-18, 2007, the U.S. Geological Survey (USGS) Caribbean Water Science Center, in cooperation with the Puerto Rico Aqueduct and Sewer Authority, conducted a bathymetric survey of Lago Garzas to update the reservoir storage capacity and update the reservoir sedimentation rate by comparing the 2007 data with the previous 1996 bathymetric survey results. The purpose of this report is to describe and document the USGS sedimentation survey conducted at Lago Garzas during July 2007, including the methods used to update the reservoir storage capacity, sedimentation rates, and areas of substantial sediment accumulation since 1996.
Accuracy Analysis of a Dam Model from Drone Surveys
Buffi, Giulia; Venturi, Sara
2017-01-01
This paper investigates the accuracy of models obtained by drone surveys. To this end, this work analyzes how the placement of ground control points (GCPs) used to georeference the dense point cloud of a dam affects the resulting three-dimensional (3D) model. Images of a double arch masonry dam upstream face are acquired from drone survey and used to build the 3D model of the dam for vulnerability analysis purposes. However, there still remained the issue of understanding the real impact of a correct GCPs location choice to properly georeference the images and thus, the model. To this end, a high number of GCPs configurations were investigated, building a series of dense point clouds. The accuracy of these resulting dense clouds was estimated comparing the coordinates of check points extracted from the model and their true coordinates measured via traditional topography. The paper aims at providing information about the optimal choice of GCPs placement not only for dams but also for all surveys of high-rise structures. The knowledge a priori of the effect of the GCPs number and location on the model accuracy can increase survey reliability and accuracy and speed up the survey set-up operations. PMID:28771185
Accuracy Analysis of a Dam Model from Drone Surveys.
Ridolfi, Elena; Buffi, Giulia; Venturi, Sara; Manciola, Piergiorgio
2017-08-03
This paper investigates the accuracy of models obtained by drone surveys. To this end, this work analyzes how the placement of ground control points (GCPs) used to georeference the dense point cloud of a dam affects the resulting three-dimensional (3D) model. Images of a double arch masonry dam upstream face are acquired from drone survey and used to build the 3D model of the dam for vulnerability analysis purposes. However, there still remained the issue of understanding the real impact of a correct GCPs location choice to properly georeference the images and thus, the model. To this end, a high number of GCPs configurations were investigated, building a series of dense point clouds. The accuracy of these resulting dense clouds was estimated comparing the coordinates of check points extracted from the model and their true coordinates measured via traditional topography. The paper aims at providing information about the optimal choice of GCPs placement not only for dams but also for all surveys of high-rise structures. The knowledge a priori of the effect of the GCPs number and location on the model accuracy can increase survey reliability and accuracy and speed up the survey set-up operations.
Lake Billy Shaw Operations and Maintenance, Final Annual Report 2000.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dodson, Guy; Pero, Vincent
Lake Billy Shaw is a newly constructed earthen dam reservoir with a surface area of 430 acres. Construction on the dam and structures was complete in November of 1998. The fish screen structures were complete in December of 1998, with initial filling in May 1999. Upon initial filling, dam structures, monitoring wells, fish screen structures, and lake level were monitored daily, with recordings being taken three times/week. During June 1999 the water to the lake was turned off in order to complete additional construction work on the lake. This work included installation of culverts around the perimeter road, installation ofmore » boat launches, finish work on the spillway structure, pumphouse and well protection and planting 4 trees along the entrance to the boat launch area. The water was turned on again in late September 1999 with all structures having been checked, fish screens greased and maintained and well levels being monitored. In 2000 the Operations and Maintenance portion of the project began with monitoring of piezometers, water levels, biological monitoring, riparian plantings, protection of shorelines, and maintenance of structures and appurtances.« less
Design and Operation of a Calorimeter for Advanced Multilayer Insulation Testing
NASA Technical Reports Server (NTRS)
Chato, David J.; Johnson, Wesley L.; Van Dresar, Neil
2016-01-01
A calorimeter has been constructed to accurately measure insulation performance with a nominal 90K outer boundary and a 20K inner boundary. Unique features of this design include use of mechanical cryocoolers instead of cryogens and measurement of the heat load with a calibrated heat conduction rod. The calorimeter is operational and has completed its first test series. The initial test series was designed to look for differences in performance between a single layer of aluminum foil and a sheet of double aluminized Mylar (DAM). Although it has been speculated that the aluminum foil would perform better, since the aluminum coating on the Mylar might not be thick enough to stop the transmission of long wave length infrared radiation, our testing showed a higher heat load for the aluminum foil than the DAM. The aluminum foil showed a heat load of 132 mW at an 87 K outer temperature and 152 mW at a 107K outer temperature, whereas the DAM showed a heat load of 66 mW at an 88 K outer temperature and 81 mW at 108 K.
Design and Operation of a Calorimeter for Advanced Multilayer Insulation Testing
NASA Technical Reports Server (NTRS)
Chato, David; Johnson, Wesley; Dresar, Neil Van
2016-01-01
A calorimeter has been constructed to accurately measure insulation performance with a nominal 90K cold outer boundary and a 20K inner boundary. Unique features of this design include use of mechanical cryocoolers instead cryogens and measurement of the heat load with a calibrated rod to serve as a conduction path. The calorimeter is operational and has completed its first test series. The initial test series was designed to look for differences in performance between a single layer of aluminum foil and a sheet of double aluminized mylar (DAM). Although it has been speculated that the aluminum foil would perform better, since the mylar coating might not thick enough to stop the transmission of long wave length infrared radiation, our testing showed a higher heat load for the aluminum foil than the DAM. The aluminum foil showed a heat load of 132 mW at an 87 K outer temperature and 152 mW at a 107K outer temperature. Whereas the DAM showed a heat load of 66 mW at an 88 K outer temperature and 81 mW at 108 K.
Operating manual for the digital data-collection system for flow-control structures
Rorabaugh, J.I.; Rapp, W.L.
1986-01-01
This manual was written to help the user operate and maintain the digital data collection system for flow control structures. The system is used to measure daily discharge through river control dams. These dams commonly have tainter gates which are raised and lowered to keep the upper pool level relatively constant as the river flow changes. In order to measure the flow through such a structure, the positions of the tainter gates and the headwater and tailwater elevations must be known. From these data, the flow through the structure can be calculated. A typical digital data collection system is shown. Digitizing devices are mounted on the hoisting mechanism of each gate, as well as at the headwater and tailwater gages. Data from these digitizers are then routed by electrical cables to a central console where they are displayed and recorded on paper tape. If the dam has locks, a pressure-sensitive switch located in the lock activates a counter in the console which keeps track of the number of times the lock is drained and filled. (USGS)
NASA Astrophysics Data System (ADS)
Carter, N. T.
2017-12-01
The nation's flood risk is increasing. The condition of U.S. dams and levees contributes to that risk. Dams and levee owners are responsible for the safety, maintenance, and rehabilitation of their facilities. Dams-Of the more than 90,000 dams in the United States, about 4% are federally owned and operated; 96% are owned by state and local governments, public utilities, or private companies. States regulate dams that are not federally owned. The number of high-hazard dams (i.e., dams whose failure would likely result in the loss of human life) has increased in the past decade. Roughly 1,780 state-regulated, high-hazard facilities with structural ratings of poor or unsatisfactory need rehabilitation. Levees-There are approximately 100,000 miles of levees in the nation; most levees are owned and maintained by municipalities and agricultural districts. Few states have levee safety programs. The U.S. Army Corps of Engineers (Corps) inspects 15,000 miles of levees, including levees that it owns and local levees participating in a federal program to assist with certain post-flood repairs. Information is limited on how regularly other levees are inspected. The consequence of a breach or failure is another aspect of risk. State and local governments have significant authority over land use and development, which can shape the social and economic impacts of a breach or failure; they also lead on emergency planning and related outreach. To date, federal dam and levee safety efforts have consisted primarily of (1) support for state dam safety standards and programs, (2) investments at federally owned dams and levees, and (3) since 2007, creation of a national levee database and enhanced efforts and procedures for Corps levee inspections and assessments. In Public Law 113-121, enacted in 2014, Congress (1) directed the Corps to develop voluntary guidelines for levee safety and an associated hazard potential classification system for levees, and (2) authorized support for the development of state levee safety programs. As of 2017, federal funding for work pursuant to these provisions has been limited. Key policy considerations include (1) whether the status quo regarding investment and responsibilities in dam and levee safety results in a tolerable level of risk nationally and locally, and (2) who bears those risks.
East, Amy E.; Collins, Brian D.; Sankey, Joel B.; Corbett, Skye C.; Fairley, Helen C.; Caster, Joshua J.
2016-05-17
We conclude that most of the river-corridor archeological sites are at elevated risk of net erosion under present dam operations. In the present flow regime, controlled floods do not simulate the magnitude or frequency of natural floods, and are not large enough to deposit sand at elevations that were flooded at annual to decadal intervals in predam time. For archeological sites that depend upon river-derived sand, we infer elevated erosion risk owing to a combination of reduced sand supply (both fluvial and aeolian) through (1) the lower-than-natural flood magnitude, frequency, and sediment supply of the controlled-flooding protocol; (2) reduction of open, dry sand area available for wind redistribution under current normal (nonflood) dam operations, which do not include flows as low as natural seasonal low flows and do include substantial daily flow fluctuations; and (3) impeded aeolian sand entrainment and transport owing to increased riparian vegetation growth in the absence of larger, more-frequent floods. If dam operations were to increase the supply of sand available for windblown transport—for example, through larger floods, sediment augmentation, or increased fluvial sandbar exposure by low flows—and also decrease riparian vegetation, the prevalence of active aeolian sand could increase over time, and the propensity for unmitigated gully erosion could decrease. Although the evolution of river-corridor landscapes and archeological sites has been altered fundamentally by the lack of large, sediment-rich floods (flows on the order of 5,000 m3/s), some combination of sediment-rich flows above 1,270 m3/s, seasonal flows below 226 m3/s, and riparian-vegetation removal might increase the preservation potential for sand-dependent archeological resources in the Colorado River corridor.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goulet, C. T.; LaGory, K. E.; Environmental Science Division
2009-10-05
Glen Canyon Dam is a hydroelectric facility located on the Colorado River in Arizona that is operated by the U.S. Bureau of Reclamation (Reclamation) for multiple purposes including water storage, flood control, power generation, recreation, and enhancement of fish and wildlife. Glen Canyon Dam operations have been managed for the last several years to improve conditions for the humpback chub (Gila cypha) and other ecosystem components. An extensive amount of literature has been produced on the humpback chub. We developed this annotated bibliography to assist managers and researchers in the Grand Canyon as they perform assessments, refine management strategies, andmore » develop new studies to examine the factors affecting humpback chub. The U.S. Geological Survey recently created a multispecies bibliography (including references on the humpback chub) entitled Bibliography of Native Colorado River Big Fishes (available at www.fort.usgs.gov/Products/data/COFishBib). That bibliography, while quite extensive and broader in scope than ours, is not annotated, and, therefore, does not provide any of the information in the original literature. In developing this annotated bibliography, we have attempted to assemble abstracts from relevant published literature. We present here abstracts taken unmodified from individual reports and articles except where noted. The bibliography spans references from 1976 to 2009 and is organized in five broad topical areas, including: (1) biology, (2) ecology, (3) impacts of dam operations, (4) other impacts, and (5) conservation and management, and includes twenty subcategories. Within each subcategory, we present abstracts alphabetically by author and chronologically by year. We present relevant articles not specific to either the humpback chub or Glen Canyon Dam, but cited in other included reports, under the Supporting Articles subcategory. We provide all citations in alphabetical order in Section 7.« less
Geologic Hazards Associated With a Proposed Dam on the Yarlung-Tsangpo River in SE Tibet
NASA Astrophysics Data System (ADS)
Zeitler, P. K.; Meltzer, A. S.; Hallet, B.; Kidd, W. S.; Koons, P. O.
2007-12-01
For a decade anecdotes and media reports have been circulating about a proposed dam on the Yarlung- Tsangpo River in SE Tibet. The proposed site is in the deep canyon of the Yarlung-Tsangpo where the river leaves the Tibetan Plateau across an immense knickpoint, falling ~2000 m along an irregular U-shaped reach ~100 km in length. The fundamental purpose of the dam is generation of ~40,000 MW of hydropower, to be used in diverting a portion of the impounded river to water-starved regions of northern China. Offsetting benefits that would accrue from improved water supply in the north, debate has centered on the water-flow and sediment-flux impacts that would be felt downstream in the Brahmaputra system in northeastern India and Bangladesh, as well as the impact of a dam and large lake on the pristine, ecologically and ethnographically diverse area around the Yarlung-Tsangpo canyon, an area of great significance to Tibetan Buddhists. We have been examining the geodynamic evolution of eastern Tibet, and have gathered considerable geophysical and geological data on the knickpoint region. The knickpoint traverses the Namche Barwa-Gyala Peri massif, one of the most geologically active regions on Earth. In this region, very rapid bedrock exhumation at rates of 7 mm/yr or more has exposed granites as young as 1 Ma, and these rates have been ongoing for at least the past 3 m.y. Detrital-dating evidence shows that these high rates continue at present and that erosion within the massif contributes fully 50% of the suspended-sediment load in the Yarlung-Tsangpo at the point where it enters the Brahmaputra (this would be about 100 Mt/yr derived from the massif). The steep slopes in the massif fail by pervasive landsliding and suggest a steady-state topography where the high erosion rates are balanced by equivalent rates of rock uplift accommodated by numerous active structures. At a more regional scale, GPS results show that steep three-dimensional velocity gradients exist across the region, in the easternmost Himalaya near Namche Barwa >50% of the Indian - Eurasian plate convergence is accommodated within the high-strain zone that reaches to the southern edge of the proposed reservoir. The 1950 Assam earthquake (M8.6) was one expression of the high local strain rates, and caused considerable damage within the canyon area. Seismic results from our portable deployment show that the area beneath the massif and the Yarlung-Tsangpo canyon is exceptionally active, with over 1000 events ranging in magnitude from 1.0 to 5.6 (mb) taking place over a 15-month period. The events occur almost entirely in the mid to shallow crust and show a range of first motions. Together these data suggest that any dam placed within the Yarlung-Tsangpo canyon would be at high risk, with the dam being prone to failure due to pronounced seismic hazards and focused deformation. As it fills water pressure behind the dam could help trigger shallow earthquakes and landslides, and the dam would be difficult to maintain given the high frequency of landsliding and extreme local bedrock exhumation rates that would lead to rapid siltation at the dam site. Further, this impoundment of the Yarlung-Tsangpo would greatly starve the sediment flux downstream in the Brahmaputra and ultimately Bay of Bengal systems.
NASA Astrophysics Data System (ADS)
Mwelwa, Elenestina; Crosato, Alessandra; Wright, Nigel; Beevers, Lindsay
2013-04-01
The research work in the Middle Zambezi sub-catchment has the key objective to investigate the state of the river and its flood plain in terms of flow variation, river and flood plain morphological variation for both the pre and post hydropower schemes. From the rich biodiversity that this area supports, both Zambia and Zimbabwe has established National Parks with Mana Pools National Park, Sapi and Chewore safari areas being designated as UNESCO World Heritage Site in 1984. The habitat sustenance depend on the river channels and the associated morphological features with the flood and recession interaction whose modification can lead to negative environmental consequences. The research findings on the state of the sub-catchment flows and morphology will be outlined. Highlights will be given on the following findings: dominance of hydropower regulation in the water balance of the river reach, historical map analysis and related rates of river channel morphology changes associated to dam operating events and, bed load sediment characterisation and distribution. With the use of SOBEK-Rural (1D/2D) model, analysis of future state of the sub-catchment will be outlined, taking into account the following scenarios: no dam state of the river reach; continue with current water regulation and operations; modification in water regulation to take into account favorable changes and; climate related variation of droughts. The research deductions and implications for maintaining the current dam operation practices will be outline as relates to the sustainability of the hydro-morphology and ecosystem of the catchment which support a rich wildlife habitat. The research observed critical water needs form the basis for environmental flows prescription and recommendation. Whereas the restoration of regular flooding has been identified to be important, the most critical need however is the timing of flood gate regulation which has been observed as a trigger to loss of islands and bars due to channel bank slumps. This phenomenon could only be observed and monitored during field research. In addition the water needs and vitality of the biological indicator - Faidherbiah Albida tree has been identified as being critical to sustenance of the habitat. The understanding gained from the research output can feed into decision making frameworks for the water resources managers in charge of the hydropower dam operation in order to consider modifications to the current dam operating rules and water allocation for environmental flows.
Influence of El Niño Southern Oscillation on global hydropower production
NASA Astrophysics Data System (ADS)
Ng, Jia Yi; Turner, Sean W. D.; Galelli, Stefano
2017-03-01
El Niño Southern Oscillation (ENSO) strongly influences the global climate system, affecting hydrology in many of the world’s river basins. This raises the prospect of ENSO-driven variability in global and regional hydroelectric power generation. Here we study these effects by generating time series of power production for 1593 hydropower dams, which collectively represent more than half of the world’s existing installed hydropower capacity. The time series are generated by forcing a detailed dam model with monthly-resolution, 20th century inflows—the model includes plant specifications, storage dynamics and realistic operating schemes, and runs irrespectively of the dam construction year. More than one third of simulated dams exhibit statistically significant annual energy production anomalies in at least one of the two ENSO phases of El Niño and La Niña. For most dams, the variability of relative anomalies in power production tends to be less than that of the forcing inflows—a consequence of dam design specifications, namely maximum turbine release rate and reservoir storage, which allows inflows to accumulate for power generation in subsequent dry years. Production is affected most prominently in Northwest United States, South America, Central America, the Iberian Peninsula, Southeast Asia and Southeast Australia. When aggregated globally, positive and negative energy production anomalies effectively cancel each other out, resulting in a weak and statistically insignificant net global anomaly for both ENSO phases.
NASA Astrophysics Data System (ADS)
Han, Jianqiao; Zhang, Wei; Yuan, Jing; Fan, Yongyang
2018-03-01
Elucidating the influence of dams on fluvial processes can benefit river protection and basin management. Based on hydrological and topographical data, we analyzed channel evolution in anabranching reaches under changing hydrological regimes influenced by the Three Gorges Dam. The main conclusions are as follows: 1) the channels of specific anabranching reaches were defined as flood trend channels or low-flow trend channels according to the distribution of their flow characteristics. The anabranching reaches were classified as T1 or T2. The former is characterized by the correspondence between the flood trend and branch channels, and the latter is characterized by the correspondence between the flood trend and main channels; 2) on the basis of the new classification, the discrepant patterns of channel evolution seen in anabranching reaches were unified into a pattern that showed flood trend channels shrinking and low-flow trend channels expanding; 3) flood abatement and the increased duration of moderate flow discharges are the main factors that affect channel adjustments in anabranching reaches after dam construction; and 4) in the next few decades, the pattern of channel evolution will remain the same as that of the Three Gorges Dam operation. That is, the morphology will fully adapt to a flow with a low coefficient of variation. Our results are of interest in the management of the Yangtze River and other rivers influenced by dams.
Increasing drought risk in large-dam basins of South Korea
NASA Astrophysics Data System (ADS)
Jung, I. W.; Shin, Y.; Park, J.; Kim, D.
2017-12-01
In 2015, South Korea suffered one of the worst droughts in recent years. Seoul and Gyeonggi and Gangwon provinces experienced severe drought conditions, receiving less than 43 percent of the annual precipitation average of the past 30 years. Additionally, the 2015 summer precipitation was less than half of the average. The lack of summer precipitation induced serious shortages in dam storages, which are important supplies for the dry season. K-water, a public company managing South Korea's public water supply system, is fighting to secure public water supply and minimize potential damage that may occur before the subsequent wet season. This study detected significant decreasing trends (95% confidence interval) in dry-seasonal runoff rates (=dam inflow / precipitation) in three dams basins (Soyang, Chungju, and Andong). Changes in potential evapotranspiration (PET) and precipitation indices were examined to investigate potential causes of decreasing runoff rates trends. However, there were no clear relations among changes in runoff rates, PET, and precipitation indices. Runoff rate reduction in the three dams may increase the risk of dam operational management and long-term water resource planning. Therefore, it will be necessary to perform a multilateral analysis to better understand decreasing runoff rates.AcknowledgementsThis research was supported by a grant(2017-MPSS31-001) from Supporting Technology Development Program for Disaster Management funded by Ministry of Public Safety and Security(MPSS) of the Korean government.
PREDICTION OF TOTAL DISSOLVED GAS EXCHANGE AT HYDROPOWER DAMS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hadjerioua, Boualem; Pasha, MD Fayzul K; Stewart, Kevin M
2012-07-01
Total dissolved gas (TDG) supersaturation in waters released at hydropower dams can cause gas bubble trauma in fisheries resulting in physical injuries and eyeball protrusion that can lead to mortality. Elevated TDG pressures in hydropower releases are generally caused by the entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin. The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. These dam operations are constrained bymore » state and federal water quality standards for TDG saturation which balance the benefits of spillway operations designed for Endangered Species Act (ESA)-listed fisheries versus the degradation to water quality as defined by TDG saturation. In the 1970s, the United States Environmental Protection Agency (USEPA), under the federal Clean Water Act (Section 303(d)), established a criterion not to exceed the TDG saturation level of 110% in order to protect freshwater and marine aquatic life. The states of Washington and Oregon have adopted special water quality standards for TDG saturation in the tailrace and forebays of hydropower facilities on the Columbia and Snake Rivers where spillway operations support fish passage objectives. The physical processes that affect TDG exchange at hydropower facilities have been studied throughout the CRB in site-specific studies and routine water quality monitoring programs. These data have been used to quantify the relationship between project operations, structural properties, and TDG exchange. These data have also been used to develop predictive models of TDG exchange to support real-time TDG management decisions. These empirically based predictive models have been developed for specific projects and account for both the fate of spillway and powerhouse flows in the tailrace channel and resultant exchange in route to the next downstream dam. Currently, there exists a need to summarize the general finding from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow the formulation of optimal daily water regulation schedules subject to water quality constraints for TDG supersaturation. A generalized TDG exchange model can also be applied to other hydropower dams that affect TDG pressures in tailraces and can be used to develop alternative operational and structural measures to minimize TDG generation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases. TDG data from hydropower facilities located throughout the northwest region of the United States will be used to identify relationships between TDG exchange and relevant dependent variables. Data analysis and regression techniques will be used to develop predictive TDG exchange expressions for various structural categories.« less
Sediment depositions upstream of open check dams: new elements from small scale models
NASA Astrophysics Data System (ADS)
Piton, Guillaume; Le Guern, Jules; Carbonari, Costanza; Recking, Alain
2015-04-01
Torrent hazard mitigation remains a big issue in mountainous regions. In steep slope streams and especially in their fan part, torrential floods mainly result from abrupt and massive sediment deposits. To curtail such phenomenon, soil conservation measures as well as torrent control works have been undertaken for decades. Since the 1950s, open check dams complete other structural and non-structural measures in watershed scale mitigation plans1. They are often built to trap sediments near the fan apexes. The development of earthmoving machinery after the WWII facilitated the dredging operations of open check dams. Hundreds of these structures have thus been built for 60 years. Their design evolved with the improving comprehension of torrential hydraulics and sediment transport; however this kind of structure has a general tendency to trap most of the sediments supplied by the headwaters. Secondary effects as channel incision downstream of the traps often followed an open check dam creation. This sediment starvation trend tends to propagate to the main valley rivers and to disrupt past geomorphic equilibriums. Taking it into account and to diminish useless dredging operation, a better selectivity of sediment trapping must be sought in open check dams, i.e. optimal open check dams would trap sediments during dangerous floods and flush them during normal small floods. An accurate description of the hydraulic and deposition processes that occur in sediment traps is needed to optimize existing structures and to design best-adjusted new structures. A literature review2 showed that if design criteria exist for the structure itself, little information is available on the dynamic of the sediment depositions upstream of open check dams, i.e. what are the geomorphic patterns that occur during the deposition?, what are the relevant friction laws and sediment transport formula that better describe massive depositions in sediment traps?, what are the range of Froude and Shields numbers that the flows tend to adopt? New small scale model experiments have been undertaken focusing on depositions processes and their related hydraulics. Accurate photogrammetric measurements allowed us to better describe the deposition processes3. Large Scale Particle Image Velocimetry (LS-PIV) was performed to determine surface velocity fields in highly active channels with low grain submersion4. We will present preliminary results of our experiments showing the new elements we observed in massive deposit dynamics. REFERENCES 1.Armanini, A., Dellagiacoma, F. & Ferrari, L. From the check dam to the development of functional check dams. Fluvial Hydraulics of Mountain Regions 37, 331-344 (1991). 2.Piton, G. & Recking, A. Design of sediment traps with open check dams: a review, part I: hydraulic and deposition processes. (Accepted by the) Journal of Hydraulic Engineering 1-23 (2015). 3.Le Guern, J. Ms Thesis: Modélisation physique des plages de depot : analyse de la dynamique de remplissage.(2014) . 4.Carbonari, C. Ms Thesis: Small scale experiments of deposition processes occuring in sediment traps, LS-PIV measurments and geomorphological descriptions. (in preparation).
NASA Astrophysics Data System (ADS)
Ho, Michelle; Lall, Upmanu; Sun, Xun; Cook, Edward
2017-04-01
Large-scale water storage infrastructure in the Conterminous United States (CONUS) provides a means of regulating the temporal variability in water supply with storage capacities ranging from seasonal storage in the wetter east to multi-annual and decadal-scale storage in the drier west. Regional differences in water availability across the CONUS provides opportunities for optimizing water dependent economic activities, such as food and energy production, through storage and transportation. However, the ability to sufficiently regulate water supplies into the future is compromised by inadequate monitoring of non-federally-owned dams that make up around 97% of all dams. Furthermore, many of these dams are reaching or have exceeded their economic design life. Understanding the role of dams in the current and future landscape of water requirements in the CONUS is needed to prioritize dam safety remediation or identify where redundant dams may be removed. A national water assessment and planning process is needed for addressing water requirements, accounting for regional differences in water supply and demand, and the role of dams in such a landscape. Most dams in the CONUS were designed without knowledge of devastating floods and prolonged droughts detected in multi-centennial paleoclimate records, consideration of projected climate change, nor consideration of optimal operation across large-scale regions. As a step towards informing water supply across the CONUS we present a paleoclimate reconstruction of annual streamflow across the CONUS over the past 555 years using a spatially and temporally complete paleoclimate record of summer drought across the CONUS targeting a set of US Geological Survey streamflow sites. The spatial and temporal structures of national streamflow variability are analyzed using hierarchical clustering, principal component analysis, and wavelet analyses. The reconstructions show signals of contemporary droughts such as the Dust Bowl (1930s) and 1950s droughts. Decadal-scale variability was detected in the late 1900s in the western US, however, similar modes of temporal variability were rarely present prior to the 1950s. The 20th century featured longer wet spells and shorter dry spells compared with the preceding 450 years. Streamflow in the Pacific Northwest and Northeast are negatively correlated with the central US suggesting the potential to mitigate some drought impacts by balancing economic activities and insurance pools across these regions during major droughts. The converging issues of a slowly growing US population, evolving demands for food, energy, and water, aging dams, and reduced water storage capacity through decommissioning and sedimentation highlights the pressing need for a national water assessment and a subsequent national water plan. There are many factors that need to be understood in order to appropriately assess dam and reservoir requirements across the CONUS and to improve water use and flood protection efficiency. In addition to historical and paleoclimate-informed surface water supply, factors requiring consideration in planning for future dam and reservoir infrastructure include: -the role of conjunctive surface and groundwater storage and use; -basin-scale operational strategies to balance sectoral water demand; -projections of surface water supply; -projections of regional water demands; -impacts of water conservation; and -the influence of water policy and financial instruments.
Modeling of snow avalanches for protection measures designing
NASA Astrophysics Data System (ADS)
Turchaninova, Alla; Lazarev, Anton; Loginova, Ekaterina; Seliverstov, Yuri; Glazovskaya, Tatiana; Komarov, Anton
2017-04-01
Avalanche protection structures such as dams have to be designed using well known standard engineering procedures that differ in different countries. Our intent is to conduct a research on structural avalanche protection measures designing and their reliability assessment during the operation using numerical modeling. In the Khibini Mountains, Russia, several avalanche dams have been constructed at different times to protect settlements and mining. Compared with other mitigation structures dams are often less expensive to construct in mining regions. The main goal of our investigation was to test the capabilities of Swiss avalanche dynamics model RAMMS and Russian methods to simulate the interaction of avalanches with mitigation structures such as catching and reflecting dams as well as to reach the observed runout distances after the transition through a dam. We present the RAMMS back-calculation results of an artificially triggered and well-documented catastrophic avalanche occurred in the town of Kirovsk, Khibini Mountains in February 2016 that has unexpectedly passed through a system of two catching dams and took the lives of 3 victims. The estimated volume of an avalanche was approximately 120,000 m3. For the calculation we used a 5 m DEM including catching dams generated from field measurements in summer 2015. We simulated this avalanche (occurred below 1000 m.a.s.l.) in RAMMS having taken the friction parameters (µ and ζ) from the upper altitude limit (above 1500 m.a.s.l.) from the table recommended for Switzerland (implemented into RAMMS) according to the results of our previous research. RAMMS reproduced the observed avalanche behavior and runout distance. No information is available concerning the flow velocity; however, calculated values correspond in general to the values measured in this avalanche track before. We applied RAMMS using an option of adding structures to DEM (including a dam in GIS) in other to test other operating catching dams in Khibini Mountains by different avalanche scenarios and discuss the technical procedure and obtained results. RAMMS results were compared with field observations data and values received with Russian well-known one dimensional avalanche models. In the Caucasus, Russia, new ski resorts are being under the development which is impossible without avalanche protection. The choice of the avalanche mitigation type has to be done by experts depending on many factors. Within the ski resort Arkhyz, Caucasus we implemented RAMMS into the procedure of the structural measures type decision making. RAMMS as well as Russian well-known one-dimensional models were used to calculate the key input parameters for structures designing. The calculation results were coupled with field observations data and historical records. Finally we suggested the avalanche protection plan for the area of interest. The interpretation of RAMMS simulations including mitigation structures has been made in order to assess the reliability of the proposed protection.
The future role of dams in the United States of America
NASA Astrophysics Data System (ADS)
Ho, Michelle; Lall, Upmanu; Allaire, Maura; Devineni, Naresh; Kwon, Hyun Han; Pal, Indrani; Raff, David; Wegner, David
2017-02-01
xml:id="wrcr22481-sec-1001" numbered="no">Storage and controlled distribution of water have been key elements of a human strategy to overcome the space and time variability of water, which have been marked by catastrophic droughts and floods throughout the course of civilization. In the United States, the peak of dam building occurred in the mid-20th century with knowledge limited to the scientific understanding and hydrologic records of the time. Ecological impacts were considered differently than current legislative and regulatory controls would potentially dictate. Additionally, future costs such as maintenance or removal beyond the economic design life were not fully considered. The converging risks associated with aging water storage infrastructure and uncertainty in climate in addition to the continuing need for water storage, flood protection, and hydropower result in a pressing need to address the state of dam infrastructure across the nation. Decisions regarding the future of dams in the United States may, in turn, influence regional water futures through groundwater outcomes, economic productivity, migration, and urban growth. We advocate for a comprehensive national water assessment and a formal analysis of the role dams play in our water future. We emphasize the urgent need for environmentally and economically sound strategies to integrate surface and groundwater storage infrastructure in local, regional, and national water planning considerations. A research agenda is proposed to assess dam failure impacts and the design, operation, and need for dams considering both paleo and future climate, utilization of groundwater resources, and the changing societal values toward the environment.
NASA Astrophysics Data System (ADS)
Ferguson, John W.; Healey, Michael; Dugan, Patrick; Barlow, Chris
2011-01-01
We compared the effects of water resource development on migratory fish in two North American rivers using a descriptive approach based on four high-level indicators: (1) trends in abundance of Pacific salmon, (2) reliance on artificial production to maintain fisheries, (3) proportion of adult salmon that are wild- versus hatchery-origin, and (4) number of salmon populations needing federal protection to avoid extinction. The two rivers had similar biological and physical features but radically different levels of water resource development: the Fraser River has few dams and all are located in tributaries, whereas the Columbia River has more than 130 large mainstem and tributary dams. Not surprisingly, we found substantial effects of development on salmon in the Columbia River. We related the results to potential effects on migratory fish in the Mekong River where nearly 200 mainstem and tributary dams are installed, under construction, or planned and could have profound effects on its 135 migratory fish species. Impacts will vary with dam location due to differential fish production within the basin, with overall effects likely being greatest from 11 proposed mainstem dams. Minimizing impacts will require decades to design specialized fish passage facilities, dam operations, and artificial production, and is complicated by the Mekong's high diversity and productivity. Prompt action is needed by governments and fisheries managers to plan Mekong water resource development wisely to prevent impacts to the world's most productive inland fisheries, and food security and employment opportunities for millions of people in the region.
1980-08-01
drain and the 8-inch pipeline are in good operating condition and appear to be well maintained. e. Reservoir Area There are neither slides, rockfalls ...Stability fOpcrc c- ,k- I p. Miscellaneous 1 1I I L Project ._Dheet___ _.. Subject ABy Gi ___ A _ A _Chk. by I 0 Q I 40 CiQI /" e6dn-r-f/aa /Ortf e / 7, 4 o
2006-06-01
scenario, occurring just north of Chiang Mai , Thailand at the Mae Ngat Dam. Figure 3 is a map of Thailand and some of its bordering countries...displayed, and distributed in real-time to local ( Chiang Mai ), theater (Bangkok), and global (Alameda and Monterey, CA) Command and Control (C2) 11...systems in support of tactical action scenarios. This year’s COASTS scenario took place at the Mae Ngat Dam, located just north of Chiang Mai , Thailand
19. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
19. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, CANAL BRIDGE, OPERATING HOUSE AND INTAKE, SOUTH END, 2/14/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ
State-and-transition prototype model of riparian vegetation downstream of Glen Canyon Dam, Arizona
Ralston, Barbara E.; Starfield, Anthony M.; Black, Ronald S.; Van Lonkhuyzen, Robert A.
2014-01-01
Facing an altered riparian plant community dominated by nonnative species, resource managers are increasingly interested in understanding how to manage and promote healthy riparian habitats in which native species dominate. For regulated rivers, managing flows is one tool resource managers consider to achieve these goals. Among many factors that can influence riparian community composition, hydrology is a primary forcing variable. Frame-based models, used successfully in grassland systems, provide an opportunity for stakeholders concerned with riparian systems to evaluate potential riparian vegetation responses to alternative flows. Frame-based, state-and-transition models of riparian vegetation for reattachment bars, separation bars, and the channel margin found on the Colorado River downstream of Glen Canyon Dam were constructed using information from the literature. Frame-based models can be simple spreadsheet models (created in Microsoft® Excel) or developed further with programming languages (for example, C-sharp). The models described here include seven community states and five dam operations that cause transitions between states. Each model divides operations into growing (April–September) and non-growing seasons (October–March) and incorporates upper and lower bar models, using stage elevation as a division. The inputs (operations) can be used by stakeholders to evaluate flows that may promote dynamic riparian vegetation states, or identify those flow options that may promote less desirable states (for example, Tamarisk [Tamarix sp.] temporarily flooded shrubland). This prototype model, although simple, can still elicit discussion about operational options and vegetation response.
14 CFR 93.71 - General operating procedures.
Code of Federal Regulations, 2014 CFR
2014-01-01
...) AIR TRAFFIC AND GENERAL OPERATING RULES SPECIAL AIR TRAFFIC RULES Flight Restrictions in the Vicinity... International Control Dam) to the United States/Canadian Border and thence along the border to the point of... to approval of Transport Canada, aircraft carrying law enforcement officials, or aircraft carrying...
Monitoring displacements of an earthen dam using GNSS and remote sensing
NASA Astrophysics Data System (ADS)
Dardanelli, Gino; La Loggia, Goffredo; Perfetti, Nicola; Capodici, Fulvio; Puccio, Luigi; Maltese, Antonino
2014-10-01
This paper shows the results of a scientific research in which a GNSS continuous monitoring system for earth-dam deformations has been developed, then, deformations have been related with reservoir water surface and level. The experiment was conducted near Bivona (Sicily, Italy), on the Castello dam (Magazzolo Lake). On the top of the dam three control points were placed and three GNSS permanent stations were installed. The three stations continuously transmitted data to the control centre of the University of Palermo. The former has been determined using freely available satellite data (specifically Landsat 7 SLC-Off) collected during the whole study period (DOYs 101 to 348 2011). Issues related with the un-scanned rows filling and to better distinguish water from land pixels on the shoreline. The aim of this work is various: first of all, we want to evaluate whether the GPS post processing techniques can provide static results comparable to other monitoring techniques, such as spirit levelling. The study could take a significant importance given that the Italian legislation until today does not provide for the use of this technology to manage or monitor dams displacements or other civil engineering constructions. The use of GPS data in structural monitoring could in fact reduce some management costs. Usually the conventional GPS monitoring methods, where a base station GPS receiver must be located near the dam, did not ensure that the accuracy of results have been independent from the displacement of the crown (top end of dam). In this paper, a new approach in the area of study of the GNSS permanent network has been engaged to solve these problems. Field-testing results show that the new GNSS approach has excellent performances, and the monitoring of different section of the dam could reveal important information on its deformation, that its not operationally possible to retrieve elsewhere. The post-processing accuracy positioning is around 1-5 mm for the deformations monitoring of the Castello dam. Displacements of different sections of the dam reveal different behaviour (in time and periodicity) that looks to be related with water surface (and level) retrieved from remote sensing.
Dam operations may improve aquatic habitat and offset negative effects of climate change.
Benjankar, Rohan; Tonina, Daniele; McKean, James A; Sohrabi, Mohammad M; Chen, Quiwen; Vidergar, Dmitri
2018-05-01
Dam operation impacts on stream hydraulics and ecological processes are well documented, but their effect depends on geographical regions and varies spatially and temporally. Many studies have quantified their effects on aquatic ecosystem based mostly on flow hydraulics overlooking stream water temperature and climatic conditions. Here, we used an integrated modeling framework, an ecohydraulics virtual watershed, that links catchment hydrology, hydraulics, stream water temperature and aquatic habitat models to test the hypothesis that reservoir management may help to mitigate some impacts caused by climate change on downstream flows and temperature. To address this hypothesis we applied the model to analyze the impact of reservoir operation (regulated flows) on Bull Trout, a cold water obligate salmonid, habitat, against unregulated flows for dry, average, and wet climatic conditions in the South Fork Boise River (SFBR), Idaho, USA. Copyright © 2018 Elsevier Ltd. All rights reserved.
Status of vaccines for porcine epidemic diarrhea virus in the United States and Canada
USDA-ARS?s Scientific Manuscript database
In 2013, porcine epidemic diarrhea virus (PEDV) emerged in the United States as a rapidly spreading epidemic causing dramatic death losses in suckling piglets. Neonatal piglets are most vulnerable to clinical disease and their only protection is passive immunity from their dam. At the end of the thi...
,
2008-01-01
Executive Summary Glen Canyon Dam is located in the lower reaches of Glen Canyon National Recreation Area on the Colorado River, approximately 15 miles upriver from Grand Canyon National Park (fig. 1). In 1992, Congress passed and the President signed into law the Grand Canyon Protection Act (GCPA; title XVIII, sec. 1801?1809, of Public Law 102-575), which seeks ?to protect, mitigate adverse impacts to, and improve the values for which Grand Canyon National Park and Glen Canyon National Recreation Area were established.? The Glen Canyon Dam Adaptive Management Program (GCDAMP) was implemented as a result of the 1996 Record of Decision on the Operation of Glen Canyon Dam Final Environmental Impact Statement to ensure that the primary mandate of the GCPA is met through advances in information and resources management (U.S. Department of the Interior, 1995). On November 3, 2006, the Bureau of Reclamation (Reclamation) announced it would develop a long-term experimental plan environmental impact statement (LTEP EIS) for operational activities at Glen Canyon Dam and other management actions on the Colorado River. The purpose of the long-term experimental plan is twofold: (1) to increase the scientific understanding of the ecosystem and (2) to improve and protect important downstream resources. The proposed plan would implement a structured, longterm program of experimentation to include dam operations, potential modifications to Glen Canyon Dam intake structures, and other management actions such as removal of nonnative fish species. The development of the long-term experimental plan continues efforts begun by the GCDAMP to protect resources downstream of Glen Canyon Dam, including Grand Canyon, through adaptive management and scientific experimentation. The LTEP EIS will rely on the extensive scientific studies that have been undertaken as part of the adaptive management program by the U.S. Geological Survey?s (USGS) Grand Canyon Monitoring and Research Center (GCMRC), one of the four research stations within the USGS Southwest Biological Science Center. On April 10 and 11, 2007, at the behest of Reclamation, the GCMRC convened a workshop with scientific experts to identify one or more scientifically credible, long-term experimental options for Reclamation to consider for the LTEP EIS that would be consistent with the purpose and need for the plan. Workshop participants included government, academic, and private scientists with broad experience in the Colorado River in Grand Canyon and regulated rivers around the world. Resource managers and GCDAMP participants were also present on the second day of the workshop. In advance of the workshop, Reclamation and LTEP EIS cooperating agencies identified 14 core scientific questions. Workshop participants were asked to consider how proposed options would address these questions, which fall primarily into four areas: (1) conservation of endangered humpback chub (Gila cypha) and other high-priority biological resources, (2) conservation of sediment resources, (3) enhancement of recreational resources, and (4) preservation of cultural resources. A secondary objective of the workshop was the evaluation of four long-term experimental options developed by the GCDAMP Science Planning Group (SPG) (appendix B). The flow and nonflow treatments called for in the four experimental options were an important starting point for workshop discussions. At the beginning of the workshop, participants were provided with the final LTEP EIS scoping report prepared by Reclamation. Participants were also advised that Reclamation had committed to ?make every effortEto ensure that a new population of humpback chub is established in the mainstem or one or more of the tributaries within Grand Canyon? in the 1995 Operation of Glen Canyon Dam Final Environmental Impact Statement (U.S. Department of the Interior, 1995). This decision was consistent with the U.S. Fish and Wildlife Service?s 1995 bi
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-08
... by USACE to operate a system of five Federal reservoir projects in the basin--Allatoona Dam and Lake... manuals for the ACT Basin in order to improve operations for authorized purposes to reflect changed... determine how the federal projects in the ACT Basin should adjust operations for their authorized purposes...
Kootenai River velocities, depth, and white sturgeon spawning site selection – A mystery unraveled?
Paragamian, V.L.; McDonald, R.; Nelson, G.J.; Barton, G.
2009-01-01
The Kootenai River white sturgeon Acipenser transmontanus population in Idaho, US and British Columbia (BC), Canada became recruitment limited shortly after Libby Dam became fully operational on the Kootenai River, Montana, USA in 1974. In the USA the species was listed under the Endangered Species Act in September of 1994. Kootenai River white sturgeon spawn within an 18-km reach in Idaho, river kilometer (rkm) 228.0–246.0. Each autumn and spring Kootenai River white sturgeon follow a ‘short two-step’ migration from the lower river and Kootenay Lake, BC, to staging reaches downstream of Bonners Ferry, Idaho. Initially, augmented spring flows for white sturgeon spawning were thought to be sufficient to recover the population. Spring discharge mitigation enhanced white sturgeon spawning but a series of research investigations determined that the white sturgeon were spawning over unsuitable incubation and rearing habitat (sand) and that survival of eggs and larvae was negligible. It was not known whether post-Libby Dam management had changed the habitat or if the white sturgeon were not returning to more suitable spawning substrates farther upstream. Fisheries and hydrology researchers made a team effort to determine if the spawning habitat had been changed by Libby Dam operations. Researchers modeled and compared velocities, sediment transport, and bathymetry with post-Libby Dam white sturgeon egg collection locations. Substrate coring studies confirmed cobbles and gravel substrates in most of the spawning locations but that they were buried under a meter or more of post-Libby Dam sediment. Analysis suggested that Kootenai River white sturgeon spawn in areas of highest available velocity and depths over a range of flows. Regardless of the discharge, the locations of accelerating velocities and maximum depth do not change and spawning locations remain consistent. Kootenai River white sturgeon are likely spawning in the same locations as pre-dam, but post-Libby Dam water management has reduced velocities and shear stress, thus sediment is now covering the cobbles and gravels. Although higher discharges will likely provide more suitable spawning and rearing conditions, this would be socially and politically unacceptable because it would bring the river elevation to or in excess of 537.66 m, which is flood stage. Thus, support should be given to habitat modifications incorporated into a management plan to restore suitable habitat and ensure better survival of eggs and larvae.
Discharge ratings for control gates at Mississippi River lock and dam 12, Bellevue, Iowa
Heinitz, Albert J.
1986-01-01
The water level of the navigation pools on the Mississippi River are maintained by the operation of tainter and roller gates at the locks and dams. Discharge ratings for the gates on Lock and Dam 12, at Bellevue, Iowa, were developed from current-meter discharge measurements made in the forebays of the gate structures. Methodology is given to accurately compute the gate openings of the tainter gates. Discharge coefficients, in equations that express discharge as a function of tailwater head , forebay head, and height of gate opening, were determined for conditions of submerged-orifice and fee-weir flow. A comparison of the rating discharges to the hydraulic-model rating discharges is given for submerged orifice flow for the tainter and roller gates.
Time-Frequency Methods for Structural Health Monitoring †
Pyayt, Alexander L.; Kozionov, Alexey P.; Mokhov, Ilya I.; Lang, Bernhard; Meijer, Robert J.; Krzhizhanovskaya, Valeria V.; Sloot, Peter M. A.
2014-01-01
Detection of early warning signals for the imminent failure of large and complex engineered structures is a daunting challenge with many open research questions. In this paper we report on novel ways to perform Structural Health Monitoring (SHM) of flood protection systems (levees, earthen dikes and concrete dams) using sensor data. We present a robust data-driven anomaly detection method that combines time-frequency feature extraction, using wavelet analysis and phase shift, with one-sided classification techniques to identify the onset of failure anomalies in real-time sensor measurements. The methodology has been successfully tested at three operational levees. We detected a dam leakage in the retaining dam (Germany) and “strange” behaviour of sensors installed in a Boston levee (UK) and a Rhine levee (Germany). PMID:24625740
Walder, J.S.; O'Connor, J. E.; Costa, J.E.; ,
1997-01-01
We analyse a simple, physically-based model of breach formation in natural and constructed earthen dams to elucidate the principal factors controlling the flood hydrograph at the breach. Formation of the breach, which is assumed trapezoidal in cross-section, is parameterized by the mean rate of downcutting, k, the value of which is constrained by observations. A dimensionless formulation of the model leads to the prediction that the breach hydrograph depends upon lake shape, the ratio r of breach width to depth, the side slope ?? of the breach, and the parameter ?? = (V.D3)(k/???gD), where V = lake volume, D = lake depth, and g is the acceleration due to gravity. Calculations show that peak discharge Qp depends weakly on lake shape r and ??, but strongly on ??, which is the product of a dimensionless lake volume and a dimensionless erosion rate. Qp(??) takes asymptotically distinct forms depending on whether < ??? 1 or < ??? 1. Theoretical predictions agree well with data from dam failures for which k could be reasonably estimated. The analysis provides a rapid and in many cases graphical way to estimate plausible values of Qp at the breach.We analyze a simple, physically-based model of breach formation in natural and constructed earthen dams to elucidate the principal factors controlling the flood hydrograph at the breach. Formation of the breach, which is assumed trapezoidal in cross-section, is parameterized by the mean rate of downcutting, k, the value of which is constrained by observations. A dimensionless formulation of the model leads to the prediction that the breach hydrograph depends upon lake shape, the ratio r of breach width to depth, the side slope ?? of the breach, and the parameter ?? = (V/D3)(k/???gD), where V = lake volume, D = lake depth, and g is the acceleration due to gravity. Calculations show that peak discharge Qp depends weakly on lake shape r and ??, but strongly on ??, which is the product of a dimensionless lake volume and a dimensionless erosion rate. Qp(??) takes asymptotically distinct forms depending on whether ?????1 or ?????1. Theoretical predictions agree well with data from dam failures for which k could be reasonably estimated. The analysis provides a rapid and in many cases graphical way to estimate plausible values of Qp at the breach.
Detecting rapid mass movements using electrical self-potential measurements
NASA Astrophysics Data System (ADS)
Heinze, Thomas; Limbrock, Jonas; Pudasaini, Shiva P.; Kemna, Andreas
2017-04-01
Rapid mass movements are a latent danger for lives and infrastructure in almost any part of the world. Often such mass movements are caused by increasing pore pressure, for example, landslides after heavy rainfall or dam breaking after intrusion of water in the dam. Among several other geophysical methods used to observe water movement, the electrical self-potential method has been applied to a broad range of monitoring studies, especially focusing on volcanism and dam leakage but also during hydraulic fracturing and for earthquake prediction. Electrical self-potential signals may be caused by various mechanisms. Though, the most relevant source of the self-potential field in the given context is the streaming potential, caused by a flowing electrolyte through porous media with electrically charged internal surfaces. So far, existing models focus on monitoring water flow in non-deformable porous media. However, as the self-potential is sensitive to hydraulic parameters of the soil, any change in these parameters will cause an alteration of the electric signal. Mass movement will significantly influence the hydraulic parameters of the solid as well as the pressure field, assuming that fluid movement is faster than the pressure diffusion. We will present results of laboratory experiments under drained and undrained conditions with fluid triggered as well as manually triggered mass movements, monitored with self-potential measurements. For the undrained scenarios, we observe a clear correlation between the mass movements and signals in the electric potential, which clearly differ from the underlying potential variations due to increased saturation and fluid flow. In the drained experiments, we do not observe any measurable change in the electric potential. We therefore assume that change in fluid properties and release of the load causes disturbances in flow and streaming potential. We will discuss results of numerical simulations reproducing the observed effect. Our results indicate that electrical self-potential measurements can observe rapid mass movements when the movement is large and fast enough to disturb the fluid pressure field significantly.
Beeman, John W.; Hansel, Hal C.; Hansen, Amy C.; Haner, Philip V.; Sprando, Jamie M.; Smith, Collin D.; Evans, Scott D.; Hatton, Tyson W.
2013-01-01
The movements and dam passage of juvenile Chinook salmon implanted with acoustic transmitters and passive integrated transponder tags were studied at Cougar Reservoir and Dam, near Springfield, Oregon. The purpose of the study was to provide information to aid with decisions about potential alternatives for improving downstream passage conditions for juvenile salmonids in this flood-control reservoir. In 2011, a total of 411 hatchery fish and 26 wild fish were tagged and released during a 3-month period in the spring, and another 356 hatchery fish and 117 wild fish were released during a 3-month period in the fall. A series of 16 autonomous hydrophones throughout the reservoir and 12 hydrophones in a collective system near the dam outlet were used to determine general movements and dam passage of the fish over the life of the acoustic transmitter, which was expected to be about 3 months. Movements within the reservoir were directional, and it was common for fish to migrate repeatedly from the head of the reservoir downstream to the dam outlet and back to the head of the reservoir. Most fish were detected near the temperature control tower at least once. The median time from release near the head of the reservoir to detection within about 100 meters of the dam outlet at the temperature control tower was between 5.7 and 10.8 days, depending on season and fish origin. Dam passage events occurred over a wider range of dates in the spring and summer than in the fall and winter, but dam passage numbers were greatest during the fall and winter. A total of 10.5 percent (43 of 411) of the hatchery fish and 15.4 percent (4 of 26) of the wild fish released in the spring are assumed to have passed the dam, whereas a total of 25.3 percent (90 of 356) of the hatchery fish and 16.9 percent (30 of 117) of the wild fish released in the fall are assumed to have passed the dam. A small number of fish passed the dam after their transmitters had stopped working and were detected at passive integrated transponder detectors at various locations downstream of the dam, indicating some tagged fish passed the dam undetected. The rate of dam passage was affected by diel period, discharge, and reservoir elevation. Diel period was the most influential factor of those examined, with nighttime dam passage rates about 9 times greater than daytime rates, depending on the distance of fish from the dam outlet. Dam passage rates also were positively related to dam discharge, and negatively related to reservoir elevation. In the operational condition used as an example, fish approached the dam outlet at the temperature control tower from the south and east and, when most fish got near the tower, they were directly in front of it. In many cases, the results for wild and hatchery fish were similar, or the results suggested hatchery fish could be reasonable surrogates for wild fish. Hatchery-origin and wild-origin fish behaved similarly in the following ways: their general movements in the reservoir; the timing of their dam passage; and the effects of diel period, discharge, and elevation on their passage rates. Parasitic copepods were present on most wild fish examined, and the mortality of wild fish during capture, handling and tagging was much greater than that of hatchery fish. This suggests that the ability of wild fish to cope with stressors may be less than that of fish directly from the hatchery.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nosova, O.N.; Margolina, O.G.; Sergeeva, N.S.
1995-08-01
This article discusses Russian experiences in monitoring earth-filled dams of the Niva region. These are low and medium head facilities in operation from 30 to 60 years. As shown by the experiences of long-term operation of earth structures in this area and on embankments being constructed by the method of dumping soil into water, it is necessary to impose more stringent requirements with respect to determining the steepness of these slopes to increase their stability, as is done when the structures are constructed dry. To organize successful monitoring of seepage processes in the investigated structures having substantial anisotropy of themore » soil, special recommendations of the disposition of piezometers under such specific conditions should be worked out. Recommendations on the disposition of piezometers under conditions of a noticeable effect of the groundwater regime of the surrounding territory on the seepage regime of the hydro development should be worked out accordingly. Since the calculations made in the work, as a result of which instability of many slopes was detected, are not always confirmed by practice, it is advisable to correct the method of such calculations with consideration of the characteristics of the formation of the seepage flow in the downstream shoulder of dams with pronounced anisotropy of the soil.« less
Geophysical investigation of seepage beneath an earthen dam.
Ikard, S J; Rittgers, J; Revil, A; Mooney, M A
2015-01-01
A hydrogeophysical survey is performed at small earthen dam that overlies a confined aquifer. The structure of the dam has not shown evidence of anomalous seepage internally or through the foundation prior to the survey. However, the surface topography is mounded in a localized zone 150 m downstream, and groundwater discharges from this zone periodically when the reservoir storage is maximum. We use self-potential and electrical resistivity tomography surveys with seismic refraction tomography to (1) determine what underlying hydrogeologic factors, if any, have contributed to the successful long-term operation of the dam without apparent indicators of anomalous seepage through its core and foundation; and (2) investigate the hydraulic connection between the reservoir and the seepage zone to determine whether there exists a potential for this success to be undermined. Geophysical data are informed by hydraulic and geotechnical borehole data. Seismic refraction tomography is performed to determine the geometry of the phreatic surface. The hydro-stratigraphy is mapped with the resistivity data and groundwater flow patterns are determined with self-potential data. A self-potential model is constructed to represent a perpendicular profile extending out from the maximum cross-section of the dam, and self-potential data are inverted to recover the groundwater velocity field. The groundwater flow pattern through the aquifer is controlled by the bedrock topography and a preferential flow pathway exists beneath the dam. It corresponds to a sandy-gravel layer connecting the reservoir to the downstream seepage zone. © 2014, National Ground Water Association.
Understanding the Amazon Hydrology for Sustainable Hydropower Development
NASA Astrophysics Data System (ADS)
Pokhrel, Y. N.; Chaudhari, S. N.
2017-12-01
Construction of 147 new hydropower dams, many of which are large, has been proposed in the Amazon river basin, despite the continuous stacking of negative impacts from the existing ones. These dams are continued to be built in a way that disrupts river ecology, causes large-scale deforestation, and negatively affects both the food systems nearby and downstream communities. In this study, we explore the impacts of the existing and proposed hydropower dams on the hydrological fluxes across the Amazonian Basin by incorporating human impact modules in an extensively validated regional hydrological model called LEAF-Hydro-Flood (LHF). We conduct two simulations, one in offline mode, forced by observed meteorological data for the historical period of 2000-2016 and the other in a coupled mode using the Weather Research and Forecasting (WRF) regional climate model. We mainly analyze terrestrial water storage and streamflow changes during the period of dam operations with and without human impacts. It is certain that the Amazon will undergo some major hydrological changes such as decrease in streamflow downstream in the coming decades caused due to these proposed dams. This study helps us understand and represent processes in a predictable manner, and provides the ability to evaluate future scenarios with dams and other major human influences while considering climate change in the basin. It also provides important insights on how to redesign the hydropower systems to make them truly renewable in terms of energy production, hydrology and ecology.
NASA Astrophysics Data System (ADS)
Dommanget, Etienne; Bellier, Joseph; Ben Daoud, Aurélien; Graff, Benjamin
2014-05-01
Compagnie Nationale du Rhône (CNR) has been granted the concession to operate the Rhone River from the Swiss border to the Mediterranean Sea since 1933 and carries out three interdependent missions: navigation, irrigation and hydropower production. Nowadays, CNR generates one quarter of France's hydropower electricity. The convergence of public and private interests around optimizing the management of water resources throughout the French Rhone valley led CNR to develop hydrological models dedicated to discharge seasonal forecasting. Indeed, seasonal forecasting is a major issue for CNR and water resource management, in order to optimize long-term investments of the produced electricity, plan dam maintenance operations and anticipate low water period. Seasonal forecasting models have been developed on the Genissiat dam. With an installed capacity of 420MW, Genissiat dam is the first of the 19 CNR's hydropower plants. Discharge forecasting at Genissiat dam is strategic since its inflows contributes to 20% of the total Rhone average discharge and consequently to 40% of the total Rhone hydropower production. Forecasts are based on hydrological statistical models. Discharge on the main Rhone River tributaries upstream Genissiat dam are forecasted from 1 to 6 months ahead thanks to multiple linear regressions. Inputs data of these regressions are identified depending on river hydrological regimes and periods of the year. For the melting season, from spring to summer, snow water equivalent (SWE) data are of major importance. SWE data are calculated from Crocus model (Météo France) and SLF's model (Switzerland). CNR hydro-meteorological forecasters assessed meteorological trends regarding precipitations for the next coming months. These trends are used to generate stochastically precipitation scenarios in order to complement regression data set. This probabilistic approach build a decision-making supports for CNR's water resource management team and provides them with seasonal forecasts and their confidence interval. After a presentation of CNR methodology, results for the years 2011 and 2013 will illustrate CNR's seasonal forecasting models ability. These years are of particular interest regarding water resource management seeing that they are, respectively, unusually dry and snowy. Model performances will be assessed in comparison with historical climatology thanks to CRPS skill score.
Integrated Data-Archive and Distributed Hydrological Modelling System for Optimized Dam Operation
NASA Astrophysics Data System (ADS)
Shibuo, Yoshihiro; Jaranilla-Sanchez, Patricia Ann; Koike, Toshio
2013-04-01
In 2012, typhoon Bopha, which passed through the southern part of the Philippines, devastated the nation leaving hundreds of death tolls and significant destruction of the country. Indeed the deadly events related to cyclones occur almost every year in the region. Such extremes are expected to increase both in frequency and magnitude around Southeast Asia, during the course of global climate change. Our ability to confront such hazardous events is limited by the best available engineering infrastructure and performance of weather prediction. An example of the countermeasure strategy is, for instance, early release of reservoir water (lowering the dam water level) during the flood season to protect the downstream region of impending flood. However, over release of reservoir water affect the regional economy adversely by losing water resources, which still have value for power generation, agricultural and industrial water use. Furthermore, accurate precipitation forecast itself is conundrum task, due to the chaotic nature of the atmosphere yielding uncertainty in model prediction over time. Under these circumstances we present a novel approach to optimize contradicting objectives of: preventing flood damage via priori dam release; while sustaining sufficient water supply, during the predicted storm events. By evaluating forecast performance of Meso-Scale Model Grid Point Value against observed rainfall, uncertainty in model prediction is probabilistically taken into account, and it is then applied to the next GPV issuance for generating ensemble rainfalls. The ensemble rainfalls drive the coupled land-surface- and distributed-hydrological model to derive the ensemble flood forecast. Together with dam status information taken into account, our integrated system estimates the most desirable priori dam release through the shuffled complex evolution algorithm. The strength of the optimization system is further magnified by the online link to the Data Integration and Analysis System, a Japanese national project for collecting, integrating and analyzing massive amount of global scale observation data, meaning that the present system is applicable worldwide. We demonstrate the integrated system with observed extreme events in Angat Watershed, the Philippines, and Upper Tone River basin, Japan. The results show promising performance for operational use of the system to support river and dam managers' decision-making.
NASA Astrophysics Data System (ADS)
Flanagan, S.; Schachter, J. M.; Schissel, D. P.
2001-10-01
A Data Analysis Monitoring (DAM) system has been developed to monitor between pulse physics analysis at the DIII-D National Fusion Facility. The system allows for rapid detection of discrepancies in diagnostic measurements or the results from physics analysis codes. This enables problems to be detected and possibly fixed between pulses as opposed to after the experimental run has concluded thus increasing the efficiency of experimental time. An example of a consistency check is comparing the stored energy from integrating the measured kinetic profiles to that calculated from magnetic measurements by EFIT. This new system also tracks the progress of MDSplus dispatching of software for data analysis and the loading of analyzed data into MDSplus. DAM uses a Java Servlet to receive messages, Clips to implement expert system logic, and displays its results to multiple web clients via HTML. If an error is detected by DAM, users can view more detailed information so that steps can be taken to eliminate the error for the next pulse. A demonstration of this system including a simulated DIII-D pulse cycle will be presented.
Migratory behavior of adult sea lamprey and cumulative passage performance through four fishways
Castro-Santos, Theodore R.; Shi, Xiaotao; Haro, Alexander
2017-01-01
This article describes a study of PIT-tagged sea lamprey (Petromyzon marinus) ascending four fishways comprising three designs at two dams on the Connecticut River, USA. Migration between dams was rapid (median migration rate = 23 km·day−1). Movement through the fishways was much slower, however (median = 0.02–0.33 km·day−1). Overall delay at dams was substantial (median = 13.6–14.6 days); many fish failed to pass (percent passage ranged from 29% to 55%, depending on fishway), and repeated passage attempts compounded delay for both passers and failers. Cox regression revealed that fishway entry rates were influenced by flow, temperature, and diel cycle, with most lampreys entering at night and at elevated flows, but with no apparent effect of sex or length. Overall delay was influenced by slow movement through the fishways, but repeated failures were the primary factor determining delay. These data suggest that although some lamprey were able to pass fishways, they did so with difficulty, and delays incurred as they attempted to pass may act to limit their distribution within their native range.
Nelson, G.H.; Ming, C.O.
1983-01-01
The construction of Aliceville lock and dam and other related channel alterations, completed in 1979, has resulted in changes to the stage-discharge relations in the vicinity. The scarcity of current-meter measurements, coupled with backwater conditions, makes definition of a single stage-discharge relation impossible. However, limit curves can be defined that would encompass such a relation. Backwater is defined as water backed up or retarded in its course as compared with water flowing under normal or natural conditions. This results in a rise in stage above normal water level while the discharge remains unaffected. Backwater is usually caused by temporary obstruction(s) to flow downstream. Backwater at Aliceville Dam results from a variety of river conditions. Some of these conditions are large tributary inflow, return of flood plain flows to the main channel during recessions, and operations at Gainesville Dam during low flows. The discharges obtained from 26 current-meter measurements, along with computed discharges through the dam, are plotted versus stage. The plot illustrates, by the scatter of data points, the variations in backwater. Curves are drawn to envelope the extreme plot patterns showing possible ranges of several feet in stage for any given discharge. The upper end of the curves were extrapolated based on the results of a step-backwater analysis.
Riparian Vegetation Encroachment Ratios in rivers below large Dams
NASA Astrophysics Data System (ADS)
Garcia de Jalón, Diego; Martínez-Fernández, Vanesa; González del Tánago, Marta
2017-04-01
Large Dams and reservoirs change the natural flow regime and consequently cause many alterations in riparian vegetation dynamics which may be assessed at different spatial and temporal scales. In Mediterranean regions flow regulation is frequently associated with irrigation. Regulated rivers with this purpose very often show reduced discharges during the wet season when the reservoir is being filled and increased discharges during the dry season when irrigation takes place. This type of regulation frequently promotes riparian vegetation growth as soil moisture levels are increased during summer when a natural drought would otherwise limit its growth. Additionally, flow regulation by large dams promotes the aging of late seral riparian vegetation reducing the frequency of flood disturbance and consequently, the potential recruitment of pioneer species. In this work we study the response of woody riparian vegetation to flow regulation by large dams in four rivers from Central Spain: Jarama, Manzanares, Guadalix and Alberche. The aim is to quantify the annual vegetation encroachment ratios and to develop a model to understand the main controlling factors, such as floodplain and channel traits; flow regulation intensity; type of regulation; present vegetation canopy; distance to the dam; and time since dam commissioning. A temporal comparison using aerial photographs from 1956, 1966, 1972, 1991, 2011 and 2014 was done in thirteen river reaches downstream from large dams, to evaluate their morphological evolution.. Floodplain dimensions and channel and riparian vegetation changes were assessed by comparing different pre-dam and post-dam conditions. Recent coloured photographs with 0.5 m spatial resolution and older black-and-white photographs at 1:33 000 spatial scale were supplied by the National Geographic Institute of Spain (www.ign.es) and the Statistical Institute (www.madrid.org/nomecalles/Inicio.icm) from Madrid Community. Similar visual scales were used to cope with different air photographs resolution. Results show a generalized natural vegetation encroachment process. Two exceptions were found associated with farming (Jarama 3) and poplar plantation (Alberche 1) that occupied riparian soils.. Annual encroachment ratios, range from 1 to 55 Ha/km, with a mean value of 12 Ha per km of river length. Higher values are found in the lowest reaches, which are far from the dam (5 cases), and also in the years following the beginning of dam operation. However, other reaches showed a delay of several years in the encroaching process, likely associated to scarcity or absence of initial woody vegetation at the time when dam started working.
Cella-Ribeiro, A; Assakawa, L F; Torrente-Vilara, G; Zuanon, J; Leite, R G; Doria, C; Duponchelle, F
2015-04-01
Monthly (April 2009 to May 2010) bottom-trawl sampling for Brachyplatystoma species along the rapids stretch of the Madeira River in Brazil revealed that Brachyplatystoma rousseauxii larvae and juveniles were present in low abundances in all areas and during all hydrological periods. The presence of larvae and juveniles throughout the hydrological cycle suggests asynchronous spawning in the headwaters of the Madeira River. © 2015 The Fisheries Society of the British Isles.
Adams, Noah S.; Smith, Collin; Plumb, John M.; Hansen, Gabriel S.; Beeman, John W.
2015-07-06
This report describes the initial year of a 2-year study to determine the feasibility of using acoustic cameras to monitor fish movements to help inform decisions about fish passage at Cougar Dam near Springfield, Oregon. Specifically, we used acoustic cameras to measure fish presence, travel speed, and direction adjacent to the water temperature control tower in the forebay of Cougar Dam during the spring (May, June, and July) and fall (September, October, and November) of 2013. Cougar Dam is a high-head flood-control dam, and the water temperature control tower enables depth-specific water withdrawals to facilitate adjustment of water temperatures released downstream of the dam. The acoustic cameras were positioned at the upstream entrance of the tower to monitor free-ranging subyearling and yearling-size juvenile Chinook salmon (Oncorhynchus tshawytscha). Because of the large size discrepancy, we could distinguish juvenile Chinook salmon from their predators, which enabled us to measure predators and prey in areas adjacent to the entrance of the tower. We used linear models to quantify and assess operational and environmental factors—such as time of day, discharge, and water temperature—that may influence juvenile Chinook salmon movements within the beam of the acoustic cameras. Although extensive milling behavior of fish near the structure may have masked directed movement of fish and added unpredictability to fish movement models, the acoustic-camera technology enabled us to ascertain the general behavior of discrete size classes of fish. Fish travel speed, direction of travel, and counts of fish moving toward the water temperature control tower primarily were influenced by the amount of water being discharged through the dam.
Design of Installing Check Dam Using RAMMS Model in Seorak National Park of South Korea
NASA Astrophysics Data System (ADS)
Jun, K.; Tak, W.; JUN, B. H.; Lee, H. J.; KIM, S. D.
2016-12-01
Design of Installing Check Dam Using RAMMS Model in Seorak National Park of South Korea Kye-Won Jun*, Won-Jun Tak*, Byong-Hee Jun**, Ho-Jin Lee***, Soung-Doug Kim* *Graduate School of Disaster Prevention, Kangwon National University, 346 Joogang-ro, Samcheok-si, Gangwon-do, Korea **School of Fire and Disaster Protection, Kangwon National University, 346 Joogang-ro, Samcheok-si, Gangwon-do, Korea ***School of Civil Engineering, Chungbuk National University, 1 Chungdae-ro, Seowon-gu, Cheongju, Korea Abstract As more than 64% of the land in South Korea is mountainous area, so many regions in South Korea are exposed to the danger of landslide and debris flow. So it is important to understand the behavior of debris flow in mountainous terrains, the various methods and models are being presented and developed based on the mathematical concept. The purpose of this study is to investigate the regions that experienced the debris flow due to typhoon called Ewiniar and to perform numerical modeling to design and layout of the Check dam for reducing the damage by the debris flow. For the performance of numerical modeling, on-site measurement of the research area was conducted including: topographic investigation, research on bridges in the downstream, and precision LiDAR 3D scanning for composed basic data of numerical modeling. The numerical simulation of this study was performed using RAMMS (Rapid Mass Movements Simulation) model for the analysis of the debris flow. This model applied to the conditions of the Check dam which was installed in the upstream, midstream, and downstream. Considering the reduction effect of debris flow, the expansion of debris flow, and the influence on the bridges in the downstream, proper location of the Check dam was designated. The result of present numerical model showed that when the Check dam was installed in the downstream section, 50 m above the bridge, the reduction effect of the debris flow was higher compared to when the Check dam were installed in other sections. Key words: Debris flow, LiDAR, Check dam, RAMMSAcknowledgementsThis research was supported by a grant [MPSS-NH-2014-74] through the Disaster and Safety Management Institute funded by Ministry of Public Safety and Security of Korean government
NASA Astrophysics Data System (ADS)
Kemp, G. Paul; Day, John W.; Rogers, J. David; Giosan, Liviu; Peyronnin, Natalie
2016-12-01
Sand transport to the Mississippi River Delta (MRD) remains sufficient to build wetlands in shallow, sheltered coastal bays fed by engineered diversions on the Mississippi River (MR) and its Atchafalaya River (AR) distributary. But suspended mud (silt & clay) flux to the coast has dropped from a mean of 390 Mt y-1 in the early 1950s, to 100 Mt y-1 since 1970. This fine-grained sediment travels deeper into receiving estuarine basins and plays a critical role in sustaining existing marshes. Virtually all of the 300 Mt y-1 of missing mud once flowed from the Missouri River (MOR) Basin before nearly 100 dams were built as part of the Pick-Sloan water development project. About 100 Mt y-1 is now intercepted by main-stem Upper MOR dams closed in 1953. But the remaining 200 Mt y-1 is trapped by impoundments built on tributaries to the Lower MOR in the 1950s and 1960s. Sediment flux during the post-dam high MOR discharge years of 1973, 1993 and 2011 approached pre-dam levels when tributaries to the Lower MOR, including the Platte and Kansas Rivers, contributed to flood flows. West bank tributaries drain a vast, arid part of the Great Plains, while those entering from the east bank traverse the lowlands of the MOR floodplain. Both provinces are dominated by highly erodible loess soils. Staunching the continued decline in MR fine-grained sediment flux has assumed greater importance now that engineered diversions are being built to reconnect the Lowermost MR to the MRD. Tributary dam bypassing in the Lower MOR basin could increase mud supply to the MRD by 100-200 Mt y-1 within 1-2 decades. Such emergency measures to save the MRD are compatible with objectives of the Missouri River Restoration and Platte River Recovery Programs to restore MOR riparian habitat for endangered species. Rapid mobilization to shunt fine-grained sediments past as many as 50 Lower MOR tributary dams in several U.S. states will undoubtedly require as much regional coordination and funding in the 21st century as the monumental effort it took to build the dams in the last century.
Ralston, Barbara E.
2011-01-01
In the spring and summer of 2000, a series of steady discharges of water from Glen Canyon Dam on the Colorado River were used to evaluate the effects of aquatic habitat stability and water temperatures on native fish growth and survival, with a special focus on the endangered humpback chub (Gila cypha), downstream from the dam in Grand Canyon. The steady releases were bracketed by peak powerplant releases in late-May and early-September. The duration and volume of releases from the dam varied between spring and summer. The intent of the experimental hydrograph was to mimic predam river discharge patterns by including a high, steady discharge in the spring and a low, steady discharge in the summer. The hydrologic experiment was called the Low Steady Summer Flow (LSSF) experiment because steady discharges of 226 m3/s dominated the hydrograph for 4 months from June through September 2000. The experimental hydrograph was developed in response to one of the U.S. Fish and Wildlife Service's Recommended and Prudent Alternatives (RPA) in its Biological Opinion of the Operation of Glen Canyon Dam Final Environmental Impact Statement. The RPA focused on the hypothesis that seasonally adjusted steady flows were dam operations that might benefit humpback chub more than the Record of Decision operations, known as Modified Low Fluctuating Flow (MLFF) operations. Condensed timelines between planning and implementation (2 months) of the experiment and the time required for logistics, purchasing, and contracting resulted in limited data collection during the high-release part of the experiment that occurred in spring. The LSSF experiment is the longest planned hydrograph that departed from the MLFF operations since Record of Decision operations began in 1996. As part of the experiment, several studies focused on the responses of physical properties related to environments that young-of-year (YOY) native fish might occupy (for example, measuring mainstem and shoreline water temperature, and quantifying useable shorelines). The part of the hydrograph that included a habitat maintenance flow (a 4-day spike at a powerplant capacity of 877 m3/s) and sustained high releases in April and May (averaging 509 m3/s) resulted in sediment export to Lake Mead, the reservoir downstream from Glen Canyon Dam, which is outside the study area. Some mid-elevation sandbar building (between 566 and 877 m3/s stage elevations) occurred from existing sediment deposits rather than from sediment inputs from tributaries during the previous winter. Low releases in the summer combined with low tributary sediment inputs resulted in minor sediment accumulation in the study area. The September habitat maintenance flow reworked accumulated sediment and resulted in increases in the area of some backwaters. The mainstem water temperatures in the reach near the Little Colorado River during the LSSF experiment varied little from previous years. Mainstem water temperatures in western Grand Canyon average 17 to 20 degrees C. During the LSSF, backwaters warmed more than other shoreline environments during the day, but most backwaters returned to mainstem water temperatures overnight. Shoreline surface water temperatures from river mile (RM) 30 to 72 varied between 9 and 28 degrees C in the middle of the day in July. These temperatures are within the optimal temperature range for humpback chub growth and spawning, which is between 15 and 24 degrees C. How surface water temperatures transfer to subsurface water temperatures is unknown. Data collection associated with the response of fish to the 2000 LSSF hydrograph focused on fish growth and abundance along the Colorado River in Grand Canyon. The target resource, humpback chub and other native fishes, did not respond in a strongly positive or strongly negative manner to the LSSF hydrograph during the sampling period, which extended from June to September 2000. In 2000, the mean total length of YOY native fishes was similar to the mean
NASA Astrophysics Data System (ADS)
St-Onge, G.; Duboc, Q.; Boyer-Villemaire, U.; Lajeunesse, P.; Bernatchez, P.
2015-12-01
Sediment cores were sampled in the estuary of the Nelson and Churchill Rivers in western Hudson Bay, as well as in the estuary of the Moisie and Sainte-Marguerite Rivers in Gulf of St. Lawrence in order to evaluate the impact of hydroelectric dams on the sedimentary regime of these estuaries. The gravity cores at the mouth of the Nelson River recorded several cm-thick rapidly deposited layers with a reverse to normal grading sequence, indicating the occurrence of hyperpycnal flows generated by major floods during the last few centuries. These hyperpycnal flows were probably caused by ice-jam formation, which can increase both the flow and the sediment concentration following the breaching of such natural dams. Following the construction of hydroelectric dams since the 1960s, the regulation of river discharge prevented the formation of hyperpycnal flows, and hence the deposition of hyperpycnites in the upper part of the cores. In the core sampled in the estuary of the Churchill River, only one hyperpycnite was recorded. This lower frequency may be due to the enclosed estuary of the Churchill River, its weaker discharge and the more distal location of the coring site.In the Gulf of St. Lawrence, grain size measurements allowed the identification of a major flood around AD 1844±4 years in box cores from both the Sainte-Marguerite and Moisie Rivers, whereas a drastic decrease in variations in the median grain size occurred around AD ~1900 in the estuary of the Sainte-Marguerite River, highlighting the offshore impact of the SM1 dam construction in the early 1900s. Furthermore, sedimentological variations in the box cores from both estuaries have been investigated by wavelet analysis and the sharp disappearance of high frequencies around AD 1900 in the estuary of the dammed river (Sainte-Marguerite River), but not in the estuary of the natural river (Moisie River), also provides evidence of the influence of dams on the sedimentary regime of estuaries.
Earthquake Hazard for Aswan High Dam Area
NASA Astrophysics Data System (ADS)
Ismail, Awad
2016-04-01
Earthquake activity and seismic hazard analysis are important components of the seismic aspects for very essential structures such as major dams. The Aswan High Dam (AHD) created the second man-made reservoir in the world (Lake Nasser) and is constructed near urban areas pose a high-risk potential for downstream life and property. The Dam area is one of the seismically active regions in Egypt and is occupied with several cross faults, which are dominant in the east-west and north-south. Epicenters were found to cluster around active faults in the northern part of Lake and AHD location. The space-time distribution and the relation of the seismicity with the lake water level fluctuations were studied. The Aswan seismicity separates into shallow and deep seismic zones, between 0 and 14 and 14 and 30 km, respectively. These two seismic zones behave differently over time, as indicated by the seismicity rate, lateral extent, b-value, and spatial clustering. It is characterized by earthquake swarm sequences showing activation of the clustering-events over time and space. The effect of the North African drought (1982 to present) is clearly seen in the reservoir water level. As it decreased and left the most active fault segments uncovered, the shallow activity was found to be more sensitive to rapid discharging than to the filling. This study indicates that geology, topography, lineations in seismicity, offsets in the faults, changes in fault trends and focal mechanisms are closely related. No relation was found between earthquake activity and both-ground water table fluctuations and water temperatures measured in wells located around the Kalabsha area. The peak ground acceleration is estimated in the dam site based on strong ground motion simulation. This seismic hazard analyses have indicated that AHD is stable with the present seismicity. The earthquake epicenters have recently took place approximately 5 km west of the AHD structure. This suggests that AHD dam must be analyzed with high priority and redesigned to increase the safety of the embankments and their appurtenant structures, if necessary. Key word Aswan High Dam, Earthquake hazard reduction
The fluvial sediment budget of a dammed river (upper Muga, southern Pyrenees)
NASA Astrophysics Data System (ADS)
Piqué, G.; Batalla, R. J.; López, R.; Sabater, S.
2017-09-01
Many rivers in the Mediterranean region are regulated for urban and agricultural purposes. Reservoir presence and operation results in flow alteration and sediment discontinuity, altering the longitudinal structure of the fluvial system. This study presents a 3-year sediment budget of a highly dammed Mediterranean river (the Muga, southern Pyrenees), which has experienced flow regulation since the 1969 owing to a 61-hm3 reservoir. Flow discharge and suspended sediment concentration were monitored immediately upstream and downstream from the reservoir, whereas bedload transport was estimated by means of bedload formulae and estimated from regional data. Results show how the dam modifies river flow, reducing the magnitude of floods and shortening its duration. At the same time, duration of low flows increases. The downstream flow regime follows reservoir releases that are mostly driven by the irrigation needs in the lowlands. Likewise, suspended sediment and bedload transport are shown to be notably affected by the dam. Sediment transport upstream was mainly associated with floods and was therefore concentrated in short periods of time (i.e., > 90% of the sediment load occurred in < 1% of the time). Downstream from the dam, sediments were transported more constantly (i.e., 90% of the load was carried during 50% of the time). Total sediment load upstream from the dam equalled 23,074 t, while downstream it was < 1000 t. Upstream, sediment load was equally distributed between suspension and bedload (i.e., 10,278 and 12,796 t respectively), whereas suspension dominated sediment transport downstream. More than 95% of the sediments transported from the upstream basins were trapped in the reservoir, a fact that explains the sediment deficit and the river bed armouring observed downstream. Overall, the dam disrupted the natural water and sediment fluxes, generating a highly modified environment downstream. Below the dam, the whole ecosystem shifted to stable conditions owing to the reduction of water and sediment loads.
Forecasting the remaining reservoir capacity in the Laurentian Great Lakes watershed
NASA Astrophysics Data System (ADS)
Alighalehbabakhani, Fatemeh; Miller, Carol J.; Baskaran, Mark; Selegean, James P.; Barkach, John H.; Dahl, Travis; Abkenar, Seyed Mohsen Sadatiyan
2017-12-01
Sediment accumulation behind a dam is a significant factor in reservoir operation and watershed management. There are many dams located within the Laurentian Great Lakes watershed whose operations have been adversely affected by excessive reservoir sedimentation. Reservoir sedimentation effects include reduction of flood control capability and limitations to both water supply withdrawals and power generation due to reduced reservoir storage. In this research, the sediment accumulation rates of twelve reservoirs within the Great Lakes watershed were evaluated using the Soil and Water Assessment Tool (SWAT). The estimated sediment accumulation rates by SWAT were compared to estimates relying on radionuclide dating of sediment cores and bathymetric survey methods. Based on the sediment accumulation rate, the remaining reservoir capacity for each study site was estimated. Evaluation of the anthropogenic impacts including land use change and dam construction on the sediment yield were assessed in this research. The regression analysis was done on the current and pre-European settlement sediment yield for the modeled watersheds to predict the current and natural sediment yield in un-modeled watersheds. These eleven watersheds are in the state of Indiana, Michigan, Ohio, New York, and Wisconsin.
Costa, John E.
1994-01-01
On October 5, 1991, following 35 consecutive days of dry weather, a 105-meter long, 37-meter wide, 5.2-meter deep concrete-lined watersupply reservoir on a hillside in the eastern edge of Centralia, Washington, suddenly failed, sending 13,250 cubic meters of water rushing down a small, steep tributary channel into the city. Two houses were destroyed, several others damaged, mud and debris were deposited in streets, on lawns, and in basements over four city blocks, and 400 people were evacuated. The cause of failure is believed to have been a sliding failure along a weak seam or joint in the siltstone bedrock beneath the reservoir, possibly triggered by increased seepage into the rock foundation through continued deterioration of concrete panel seams, and a slight rise (0.6 meters) in the pool elevation. A second adjacent reservoir containing 18,900 cubic meters of water also drained, but far more slowly, when a 41-cm diameter connecting pipe was broken by the landslide. The maximum discharge resulting from the dam-failure was about 71 cubic meters per second. A reconstructed hydrograph based on the known reservoir volume and calculated peak discharge indicates the flood duration was about 6.2 minutes. Sedimentologic evidence, high-water mark distribution, and landforms preserved in the valley floor indicate that the dam failure flood consisted of two flow phases: an initial debris flow that deposited coarse bouldery sediment along the slope-area reach as it lost volume, followed soon after by a water-flood that achieved a stage about one-half meter higher than the debris flow. The Centralia dam failure is one of three constructed dams destroyed by rapid foundation failure that defines the upper limits of an envelope curve of peak flood discharge as a function of potential energy for failed constructed dams worldwide.
Schenk, Edward R.; Skalak, Katherine J.; Benthem, Adam J.; Dietsch, Benjamin J.; Woodward, Brenda K.; Wiche, Gregg J.; Galloway, Joel M.; Nustad, Rochelle A.; Hupp, Cliff R.
2014-01-01
The 2011 flood on the Missouri River was one of the largest floods since the river became regulated by a series of high dams in the mid-20th century (greater than 150,000 cubic feet per second during the peak). The flood persisted through most of the summer, eroding river banks, adding sand to sandbars, and moving the thalweg of the channel in many places. The U.S. Geological Survey monitored and assessed the changes in two reaches of the Missouri River: the Garrison Reach in North Dakota, bounded by the Garrison Dam and the Lake Oahe Reservoir, and the Recreational Reach along the boundary of South Dakota and Nebraska bounded upstream by the Gavins Point Dam and extending downstream from Ponca, Nebraska. Historical cross-section data from the Garrison Dam closure until immediately before the flood indicate that the upper reaches of the river near the dam experienced rapid erosion, channel incision, and island/sandbar loss following the dam closure. The erosion, incision, and land loss lessened with time. Conversely, the lower reach near the Lake Oahe Reservoir slackwaters became depositional with channel in-filling and sandbar growth through time as the flow slowed upon reaching the reservoir. Preliminary post-flood results in the Garrison Reach indicate that the main channel has deepened at most cross-sections whereas sandbars and islands have grown vertically. Sandbars and the thalweg migrated within the Recreational Reach, however net scouring and aggradation was minimal. Changes in the two-dimensional area of sandbars and islands are still being assessed using high-resolution satellite imagery. A sediment balance can be constructed for the Garrison Reach using cross-sections, bathymetric data, sand traps for wind-blown material, a quasi-three-dimensional numerical model, and dating of sediment cores. Data collection and analysis for a reach-scale sediment balance and a concurrent analysis of the effects of riparian and island vegetation on sediment deposition currently (2014) is ongoing.
Mesa, Matthew G.
1994-01-01
Northern squaw fish Ptychocheilus oregonensis are the predominant predators of juvenile Pacific salmonids Oncorhynchus spp. in the Columbia River, and their predation rates are greatest just below dams. Because juvenile salmonids are commonly subjected to multiple stressors at dams in the course of their seaward migration, high predation rates below dams may be due in part to an increase in the vulnerability of stressed fish. I conducted laboratory experiments to examine the predator avoidance ability and physiological stress responses of juvenile chinook salmon O. tshawytscha subjected to treatments (stressors) designed to simulate routine hatchery practices (multiple handlings) or dam passage (multiple agitations). Both stressors resulted in lethargic behavior in the fish, and agitation also caused disorieniation and occasional injury. When equal numbers of stressed and unstressed fish were exposed to northern squawfish for up to 1 h, significantly more stressed fish were eaten, but this effect was not evident during longer exposures. The lack of differential predation in trials lasting up to 24 h can be explained by the rapid development of schooling behavior in the prey, but other possibilities exist, such as changing ratios of stressed and unstressed prey over time. Concentrations of plasma cortisol, glucose, and lactate in fish subjected to multiple stressors were similar and sometimes cumulative, returned to prestress levels within 6-24 h, and correlated poorly with predator avoidance ability. My results suggest that juvenile salmonids are capable of avoiding predators within 1 h after being subjected to multiple acute stressors even though physiological homeostasis may be altered for up to 24 h. Therefore, because juvenile salmonids typically reside in lailrace areas for only a short time after dam passage, measures aimed at reducing physical stress or protecting them as they migrate through dam tailraces may help alleviate the relatively intense predation in these areas.
Beaver ponds' impact on fluvial processes (Beskid Niski Mts., SE Poland).
Giriat, Dorota; Gorczyca, Elżbieta; Sobucki, Mateusz
2016-02-15
Beaver (Castor sp.) can change the riverine environment through dam-building and other activities. The European beaver (Castor fiber) was extirpated in Poland by the nineteenth century, but populations are again present as a result of reintroductions that began in 1974. The goal of this paper is to assess the impact of beaver activity on montane fluvial system development by identifying and analysing changes in channel and valley morphology following expansion of beaver into a 7.5 km-long headwater reach of the upper Wisłoka River in southeast Poland. We document the distribution of beaver in the reach, the change in river profile, sedimentation type and storage in beaver ponds, and assess how beaver dams and ponds have altered channel and valley bottom morphology. The upper Wisłoka River fluvial system underwent a series of anthropogenic disturbances during the last few centuries. The rapid spread of C. fiber in the upper Wisłoka River valley was promoted by the valley's morphology, including a low-gradient channel and silty-sand deposits in the valley bottom. At the time of our survey (2011), beaver ponds occupied 17% of the length of the study reach channel. Two types of beaver dams were noted: in-channel dams and valley-wide dams. The primary effect of dams, investigated in an intensively studied 300-m long subreach (Radocyna Pond), was a change in the longitudinal profile from smooth to stepped, a local reduction of the water surface slope, and an increase in the variability of both the thalweg profile and surface water depths. We estimate the current rate of sedimentation in beaver ponds to be about 14 cm per year. A three-stage scheme of fluvial processes in the longitudinal and transverse profile of the river channel is proposed. C. fiber reintroduction may be considered as another important stage of the upper Wisłoka fluvial system development. Copyright © 2015 Elsevier B.V. All rights reserved.
NASA Technical Reports Server (NTRS)
2008-01-01
The Sichuan earthquake in China occurred on May 12, 2008, along faults within the mountains, but near and almost parallel the mountain front, northwest of the city of Chengdu. This major quake caused immediate and severe damage to many villages and cities in the area. Aftershocks pose a continuing danger, but another continuing hazard is the widespread occurrence of landslides that have formed new natural dams and consequently new lakes. These lakes are submerging roads and flooding previously developed lands. But an even greater concern is the possible rapid release of water as the lakes eventually overflow the new dams. The dams are generally composed of disintegrated rock debris that may easily erode, leading to greater release of water, which may then cause faster erosion and an even greater release of water. This possible 'positive feedback' between increasing erosion and increasing water release could result in catastrophic debris flows and/or flooding. The danger is well known to the Chinese earthquake response teams, which have been building spillways over some of the new natural dams. This ASTER image, acquired on June 1, 2008, shows two of the new large landslide dams and lakes upstream from the town of Chi-Kua-Kan at 32o12'N latitude and 104o50'E longitude. Vegetation is green, water is blue, and soil is grayish brown in this enhanced color view. New landslides appear bright off-white. The northern (top) lake is upstream from the southern lake. Close inspection shows a series of much smaller lakes in an elongated 'S' pattern along the original stream path. Note especially the large landslides that created the dams. Some other landslides in this area, such as the large one in the northeast corner of the image, occur only on the mountain slopes, so do not block streams, and do not form lakes.