Sample records for reactors prime contractor

  1. Space Nuclear Power Plant Pre-Conceptual Design Report, For Information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    B. Levine

    2006-01-27

    This letter transmits, for information, the Project Prometheus Space Nuclear Power Plant (SNPP) Pre-Conceptual Design Report completed by the Naval Reactors Prime Contractor Team (NRPCT). This report documents the work pertaining to the Reactor Module, which includes integration of the space nuclear reactor with the reactor radiation shield, energy conversion, and instrumentation and control segments. This document also describes integration of the Reactor Module with the Heat Rejection segment, the Power Conditioning and Distribution subsystem (which comprise the SNPP), and the remainder of the Prometheus spaceship.

  2. Naval Reactors Prime Contractor Team (NRPCT) Experiences and Considerations With Irradiation Test Performance in an International Environment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MH Lane

    2006-02-15

    This letter forwards a compilation of knowledge gained regarding international interactions and issues associated with Project Prometheus. The following topics are discussed herein: (1) Assessment of international fast reactor capability and availability; (2) Japanese fast reactor (JOYO) contracting strategy; (3) NRPCT/Program Office international contract follow; (4) Completion of the Japan Atomic Energy Agency (JAEA)/Pacific Northwest National Laboratory (PNNL) contract for manufacture of reactor test components; (5) US/Japanese Departmental interactions and required Treaties and Agreements; and (6) Non-technical details--interactions and considerations.

  3. 48 CFR 45.501 - Prime contractor alternate locations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor alternate... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property Administration 45.501 Prime contractor... administration from another contract administration office, for purposes of evaluating prime contractor...

  4. 75 FR 43166 - Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-23

    ...] Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients AGENCY: Office... information collection requirement regarding Central Contractor Registration Requirements for Prime Grant... for the proper performance of functions of the Central Contractor Registration Requirements for Prime...

  5. Research reactor decommissioning experience - concrete removal and disposal -

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Manning, Mark R.; Gardner, Frederick W.

    1990-07-01

    Removal and disposal of neutron activated concrete from biological shields is the most significant operational task associated with research reactor decommissioning. During the period of 1985 thru 1989 Chem-Nuclear Systems, Inc. was the prime contractor for complete dismantlement and decommissioning of the Northrop TRIGA Mark F, the Virginia Tech Argonaut, and the Michigan State University TRIGA Mark I Reactor Facilities. This paper discusses operational requirements, methods employed, and results of the concrete removal, packaging, transport and disposal operations for these (3) research reactor decommissioning projects. Methods employed for each are compared. Disposal of concrete above and below regulatory release limitsmore » for unrestricted use are discussed. This study concludes that activated reactor biological shield concrete can be safely removed and buried under current regulations.« less

  6. 48 CFR 49.108-2 - Prime contractor's rights and obligations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor's rights and obligations. 49.108-2 Section 49.108-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-2 Prime contractor's rights...

  7. 40 CFR 35.938-6 - Progress payments to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Progress payments to contractors. 35... § 35.938-6 Progress payments to contractors. (a) Policy. EPA policy is that, except as State law otherwise provides, grantees should make prompt progress payments to prime contractors and prime contractors...

  8. 48 CFR 32.504 - Subcontracts under prime contracts providing progress payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor shall not delete the references to “Contracting Officer” and “Government” in adapting paragraph (g... “Contracting Officer” may be changed to “Contracting Officer or Prime Contractor.” (ii) The term “the Government” may be changed to “the Government or Prime Contractor.” (3) The subcontract special terms...

  9. Searching for Contracting Patterns over Time: Do Prime Contractor and Subcontractor Relations Follow Similar Patterns for Professional Services Provision?

    ERIC Educational Resources Information Center

    Ponomariov, Branco; Kingsley, Gordon; Boardman, Craig

    2011-01-01

    This paper compares over a 12-year period (1) patterns of contracting between a state transportation agency and its prime contractors providing engineering design services with (2) patterns between these prime contractors and their subcontractors. We find evidence of different contracting patterns at each level that emerge over time and coexist in…

  10. 75 FR 22805 - Submission for OMB Review; American Recovery and Reinvestment Act-Quarterly Reporting for Prime...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... Recovery and Reinvestment Act--Quarterly Reporting for Prime Contractors AGENCIES: Department of Defense... Reinvestment Act--Quarterly Reporting for Prime Contractors published in the Federal Register is being...

  11. 78 FR 54252 - Information Collection; American Recovery and Reinvestment Act-Reporting Requirements-One Time...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-03

    ... Contractors AGENCY: Department of Defense (DOD), General Services Administration (GSA), and National... Requirements for Prime Contractors. DATES: Submit comments on or before November 4, 2013. ADDRESSES: Submit... Requirements-- One Time Reporting Requirements for Prime Contractors, by any of the following methods...

  12. Littoral Combat Ship and Frigate: Congress Faced with Critical Acquisition Decisions

    DTIC Science & Technology

    2016-12-01

    D.C.: Mar. 1, 2005). 3Lockheed Martin is the prime contractor for LCS 1 and the odd numbered seaframes. For LCS 2 and LCS 4, General Dynamics was...the prime contractor for the Austal USA built ships. General Dynamics and Austal USA ended their teaming arrangement in 2010. Austal USA is the...prime contractor for the remaining even-numbered seaframes. The Course of the LCS Program Has Changed Significantly over Time Page 3 GAO

  13. 75 FR 17919 - Submission for OMB Review; American Recovery and Reinvestment Act-One-time Reporting Requirements...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ... Recovery and Reinvestment Act--One-time Reporting Requirements for Prime Contractors AGENCY: Department of... requirement concerning the American Recovery and Reinvestment Act--One-time Reporting Requirements for Prime... Act--One-time Reporting Requirements for Prime Contractors, in all correspondence. FOR FURTHER...

  14. Organizational Considerations for Implementing Systems Engineering and Integration in the Ares Projects Office

    NASA Technical Reports Server (NTRS)

    Thomas, LeAnn; Doreswamy, Rajiv N.

    2008-01-01

    Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent successes have been smaller, short-duration development projects using heritage hardware/software, focused technology development, technical oversight and stable external factors. (2) Programs and projects have failed or been terminated due to lack of technical insight, relaxing of SE&I processes, and unstable external factors. (3) The study did not find a single, clear optimum SE&I organization type to fit all projects. However, while any organizational structure can be made to work, the fewer complexities in the program, the better the likelihood of success. (4) The most common successful SE&I organization structure type in the study was type 4b, where the government maintained integration responsibility, with the prime contractor providing SE&I products and the government providing technical oversight. This study was instrumental in helping the APO select organization structure 4, following the same SE&I and oversight process used during humanlund7s last voyages to the Moon.

  15. Navy Virginia (SSN 774) Class Attack Submarine Procurement: Background and Issues for Congress

    DTIC Science & Technology

    2016-10-25

    proposed plan include the following:  GD/EB is to be the prime contractor for designing and building Ohio replacement boats;  HII/NNS is to be a...boats, and HII/NNS would receive 22%-23%;  GD/EB is to continue as prime contractor for the Virginia-class program, but to help balance out projected...execute this strategy, GDEB has been selected as the prime contractor for OR with the responsibilities to deliver the twelve OR [Ohio replacement

  16. Technology transfer from the viewpoint of a NASA prime contractor

    NASA Technical Reports Server (NTRS)

    Dyer, Gordon

    1992-01-01

    Viewgraphs on technology transfer from the viewpoint of a NASA prime contractor are provided. Technology Transfer Program for Manned Space Systems and the Technology Transfer Program status are addressed.

  17. 40 CFR 33.302 - Are there any additional contract administration requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime... the subcontract for any reason, the recipient must require the prime contractor to employ the six good...

  18. 48 CFR 1019.202-70-5 - Incentives for prime contractor participation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for prime contractor participation. (a) Under the Small Business Act, 15 U.S.C. 637(d)(4)(E), Treasury.../management factors. (b) A mentor's performance will be evaluated against the criteria described in DTAR 1052... contracts as a factor in determining contractor responsibility under FAR 19.705-5(a)(1). (d) Mentor-protégé...

  19. 75 FR 22805 - Submission for OMB Review; American Recovery and Reinvestment Act-One-Time Reporting Requirements...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... Recovery and Reinvestment Act--One-Time Reporting Requirements for Prime Contractors AGENCIES: Department... Recovery and Reinvestment Act--One-time Reporting Requirements for Prime Contractors published in the...

  20. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for Research, Development, Test, and Evaluation, Fiscal Year 1987.

    DTIC Science & Technology

    1987-01-01

    Headquarters Services Directorate for Information Operations and Reports D) ,( /NT IS lientitra on nn Iber for hIs bh act& r, s (i0 ’F H 7 FOREWORD 500...This report provides information on the 500 contractors that received the largest dollar volume in Department of Defense (DOD) prime contract awards... report presents summary data on the 500 prime contractors receiving the largest dollar volume in Department of Defense (DOD) awards over $25,000 for

  1. 48 CFR 1809.670 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...

  2. 48 CFR 1809.670 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...

  3. 48 CFR 1809.670 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...

  4. 48 CFR 1809.670 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...

  5. Promethus Hot Leg Piping Concept

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    AM Girbik; PA Dilorenzo

    2006-01-24

    The Naval Reactors Prime Contractor Team (NRPCT) recommended the development of a gas cooled reactor directly coupled to a Brayton energy conversion system as the Space Nuclear Power Plant (SNPP) for NASA's Project Prometheus. The section of piping between the reactor outlet and turbine inlet, designated as the hot leg piping, required unique design features to allow the use of a nickel superalloy rather than a refractory metal as the pressure boundary. The NRPCT evaluated a variety of hot leg piping concepts for performance relative to SNPP system parameters, manufacturability, material considerations, and comparison to past high temperature gas reactormore » (HTGR) practice. Manufacturability challenges and the impact of pressure drop and turbine entrance temperature reduction on cycle efficiency were discriminators between the piping concepts. This paper summarizes the NRPCT hot leg piping evaluation, presents the concept recommended, and summarizes developmental issues for the recommended concept.« less

  6. 48 CFR 52.203-7 - Anti-Kickback Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Anti-Kickback Procedures. 52.203-7 Section 52.203-7 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... indirectly, to any prime Contractor, prime Contractor employee, subcontractor, or subcontractor employee for...

  7. 48 CFR 52.203-7 - Anti-Kickback Procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 2 2013-10-01 2013-10-01 false Anti-Kickback Procedures. 52.203-7 Section 52.203-7 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... indirectly, to any prime Contractor, prime Contractor employee, subcontractor, or subcontractor employee for...

  8. 48 CFR 52.203-7 - Anti-Kickback Procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false Anti-Kickback Procedures. 52.203-7 Section 52.203-7 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... indirectly, to any prime Contractor, prime Contractor employee, subcontractor, or subcontractor employee for...

  9. 48 CFR 3052.219-72 - Evaluation of prime contractor participation in the DHS mentor-protégé program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor participation in the DHS mentor-protégé program. 3052.219-72 Section 3052.219-72 Federal... Evaluation of prime contractor participation in the DHS mentor-protégé program. As prescribed in (HSAR) 48... the DHS Mentor-Protégé Program (JUN 2006) This solicitation contains a source selection factor or...

  10. Comparison of Fission Product Yields and Their Impact

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    S. Harrison

    2006-02-01

    This memorandum describes the Naval Reactors Prime Contractor Team (NRPCT) Space Nuclear Power Program (SNPP) interest in determining the expected fission product yields from a Prometheus-type reactor and assessing the impact of these species on materials found in the fuel element and balance of plant. Theoretical yield calculations using ORIGEN-S and RACER computer models are included in graphical and tabular form in Attachment, with focus on the desired fast neutron spectrum data. The known fission product interaction concerns are the corrosive attack of iron- and nickel-based alloys by volatile fission products, such as cesium, tellurium, and iodine, and the radiologicalmore » transmutation of krypton-85 in the coolant to rubidium-85, a potentially corrosive agent to the coolant system metal piping.« less

  11. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.

  12. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors. Decatur Mayor Tab Bowling greets David Brock.

  13. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts. MSFC Director Todd May shares opening remarks.

  14. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. Decatur Mayor Tab Bowling welcomes attendees.

  15. Government - Prime Contractor - Subcontractor Relationships: An Analysis.

    DTIC Science & Technology

    1979-12-01

    contract, prime contractor frustration and animosity due to over zealous 122 JAM ,- Government managers, and subcontractor problems of "over- reach" and...Journal, Vol. 12, No. 2,Second Quarter, 1978. 41. Singer, N.P., "The Unheard of Standard Set of Sub- contract Terms and Conditions - As Easy as Pumpkin Pie

  16. 48 CFR 49.104 - Duties of prime contractor after receipt of notice of termination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Duties of prime contractor after receipt of notice of termination. 49.104 Section 49.104 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.104...

  17. 78 FR 30233 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ... Number 0750-AG38 Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access... Government support contractors to have access to proprietary technical data belonging to prime contractors and other third parties, provided that the technical data owner may require the support contractor to...

  18. 48 CFR 9.604 - Limitations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.604 Limitations. Nothing in this subpart authorizes contractor team arrangements in violation of antitrust statutes or limits the Government's rights to— (a... team arrangement, the responsibility of the prime contractor (see subpart 9.1); (c) Provide to the...

  19. 48 CFR 9.604 - Limitations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.604 Limitations. Nothing in this subpart authorizes contractor team arrangements in violation of antitrust statutes or limits the Government's rights to— (a... team arrangement, the responsibility of the prime contractor (see subpart 9.1); (c) Provide to the...

  20. 48 CFR 9.604 - Limitations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.604 Limitations. Nothing in this subpart authorizes contractor team arrangements in violation of antitrust statutes or limits the Government's rights to— (a... team arrangement, the responsibility of the prime contractor (see subpart 9.1); (c) Provide to the...

  1. 48 CFR 9.604 - Limitations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.604 Limitations. Nothing in this subpart authorizes contractor team arrangements in violation of antitrust statutes or limits the Government's rights to— (a... team arrangement, the responsibility of the prime contractor (see subpart 9.1); (c) Provide to the...

  2. 48 CFR 9.604 - Limitations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.604 Limitations. Nothing in this subpart authorizes contractor team arrangements in violation of antitrust statutes or limits the Government's rights to— (a... team arrangement, the responsibility of the prime contractor (see subpart 9.1); (c) Provide to the...

  3. 48 CFR 719.273-3 - Incentives for prime contractor participation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Development (USAID) Mentor-Protégé Program 719.273-3 Incentives for prime contractor participation. (a... provides additional guidance. (b) Costs incurred by a Mentor to provide developmental assistance, as... reimbursable as a direct cost under a USAID contract. If USAID is the mentor's responsible audit agency under...

  4. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into... a prime contractor's or general manager's obligations for a development project; or (c) Entry into a...

  5. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into... a prime contractor's or general manager's obligations for a development project; or (c) Entry into a...

  6. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into... a prime contractor's or general manager's obligations for a development project; or (c) Entry into a...

  7. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Prime contractor performance requirements (limitations on subcontracting). 125.6 Section 125.6 Business Credit and Assistance SMALL BUSINESS... subcontracting). (a) In order to be awarded a full or partial small business set-aside contract, an 8(a) contract...

  8. David Brock addresses the "How to Launch Your Business with NASA" forum.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. David Brock, head of Marshall's Small Business Office talks about doing business with Marshall.

  9. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts. MSFC Director Todd May and Decatur Mayor Tab Bowling enjoy a light moment.

  10. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. OSAC Director Johnny Stephenson talks about Marshall's Mission areas to audience

  11. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors. Decatur Mayor Tab Bowling chats with NASA retiree Don Odum

  12. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. City of Hartselle Mayor Randy Garrison welcomes attendees to conference.

  13. Nuclear Physics Made Very, Very Easy

    NASA Technical Reports Server (NTRS)

    Hanlen, D. F.; Morse, W. J.

    1968-01-01

    The fundamental approach to nuclear physics was prepared to introduce basic reactor principles to various groups of non-nuclear technical personnel associated with NERVA Test Operations. NERVA Test Operations functions as the field test group for the Nuclear Rocket Engine Program. Nuclear Engine for Rocket Vehicle Application (NERVA) program is the combined efforts of Aerojet-General Corporation as prime contractor, and Westinghouse Astronuclear Laboratory as the major subcontractor, for the assembly and testing of nuclear rocket engines. Development of the NERVA Program is under the direction of the Space Nuclear Propulsion Office, a joint agency of the U.S. Atomic Energy Commission and the National Aeronautics and Space Administration.

  14. 78 FR 79455 - Information Collection; System for Award Management Registration Requirements for Prime Grant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-30

    ...Under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35), the Regulatory Secretariat Division will be submitting to the Office of Management and Budget (OMB) a request to review and approve a renewal of the currently approved information collection requirement regarding the pre-award registration requirements for Prime Grant Recipients. The title of the approved information collection is Central Contractor Registration Requirements for Prime Grant Recipients (OMB Control Number 3090-0290). The updated information collection title, based on the migration of the Central Contractor Registration system to the System for Award Management in late July 2012, is System for Award Management Registration Requirements for Prime Grant Recipients.

  15. 48 CFR 32.110 - Payment of subcontractors under cost-reimbursement prime contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... under cost-reimbursement prime contracts. 32.110 Section 32.110 Federal Acquisition Regulations System... Purchase Financing 32.110 Payment of subcontractors under cost-reimbursement prime contracts. If the contractor makes financing payments to a subcontractor under a cost-reimbursement prime contract, the...

  16. KSC-2010-5283

    NASA Image and Video Library

    2010-10-19

    CAPE CANAVERAL, Fla. -- Business leaders interested in learning more about government contracting and what local and national vendors have to offer walk through the Business Opportunities Expo 2010 in Cruise Terminal 3 at Port Canaveral, Fla. The annual trade show is sponsored by NASA Kennedy Space Center's Prime Contractor Board, the 45th Space Wing and Canaveral Port Authority. It featured about 175 business and government exhibitors from across the nation and Brevard County. NASA's Central Industry Assistance Office provides support to small businesses that want to do business at Kennedy. This office works with the NASA Kennedy Prime Contractor Board, which consists of many of the center's prime contractors to help small businesses learn how to navigate in the world of government contracting. By co-sponsoring the expo, the board helps provide a one-stop shop for buyers and sellers. Photo credit: Kim Shiflett

  17. KSC-2010-5281

    NASA Image and Video Library

    2010-10-19

    CAPE CANAVERAL, Fla. -- Business leaders interested in learning more about government contracting and what local and national vendors have to offer walk through the Business Opportunities Expo 2010 in Cruise Terminal 3 at Port Canaveral, Fla. The annual trade show is sponsored by NASA Kennedy Space Center's Prime Contractor Board, the 45th Space Wing and Canaveral Port Authority. It featured about 175 business and government exhibitors from across the nation and Brevard County. NASA's Central Industry Assistance Office provides support to small businesses that want to do business at Kennedy. This office works with the NASA Kennedy Prime Contractor Board, which consists of many of the center's prime contractors to help small businesses learn how to navigate in the world of government contracting. By co-sponsoring the expo, the board helps provide a one-stop shop for buyers and sellers. Photo credit: Kim Shiflett

  18. KSC-2010-5280

    NASA Image and Video Library

    2010-10-19

    CAPE CANAVERAL, Fla. -- Business leaders interested in learning more about government contracting and what local and national vendors have to offer attend the opening ceremonies of the Business Opportunities Expo 2010 in Cruise Terminal 3 at Port Canaveral, Fla. The annual trade show is sponsored by NASA Kennedy Space Center's Prime Contractor Board, the 45th Space Wing and Canaveral Port Authority. It featured about 175 business and government exhibitors from across the nation and Brevard County. NASA's Central Industry Assistance Office provides support to small businesses that want to do business at Kennedy. This office works with the NASA Kennedy Prime Contractor Board, which consists of many of the center's prime contractors to help small businesses learn how to navigate in the world of government contracting. By co-sponsoring the expo, the board helps provide a one-stop shop for buyers and sellers. Photo credit: Kim Shiflett

  19. KSC-2010-5282

    NASA Image and Video Library

    2010-10-19

    CAPE CANAVERAL, Fla. -- Business leaders interested in learning more about government contracting and what local and national vendors have to offer walk through the Business Opportunities Expo 2010 in Cruise Terminal 3 at Port Canaveral, Fla. The annual trade show is sponsored by NASA Kennedy Space Center's Prime Contractor Board, the 45th Space Wing and Canaveral Port Authority. It featured about 175 business and government exhibitors from across the nation and Brevard County. NASA's Central Industry Assistance Office provides support to small businesses that want to do business at Kennedy. This office works with the NASA Kennedy Prime Contractor Board, which consists of many of the center's prime contractors to help small businesses learn how to navigate in the world of government contracting. By co-sponsoring the expo, the board helps provide a one-stop shop for buyers and sellers. Photo credit: Kim Shiflett

  20. KSC-2010-5284

    NASA Image and Video Library

    2010-10-19

    CAPE CANAVERAL, Fla. -- Business leaders interested in learning more about government contracting and what local and national vendors have to offer walk through the Business Opportunities Expo 2010 in Cruise Terminal 3 at Port Canaveral, Fla. The annual trade show is sponsored by NASA Kennedy Space Center's Prime Contractor Board, the 45th Space Wing and Canaveral Port Authority. It featured about 175 business and government exhibitors from across the nation and Brevard County. NASA's Central Industry Assistance Office provides support to small businesses that want to do business at Kennedy. This office works with the NASA Kennedy Prime Contractor Board, which consists of many of the center's prime contractors to help small businesses learn how to navigate in the world of government contracting. By co-sponsoring the expo, the board helps provide a one-stop shop for buyers and sellers. Photo credit: Kim Shiflett

  1. Subcontracting Management Handbook

    DTIC Science & Technology

    1988-05-01

    nature Government involvement with subcontracto-s must be channeled through C.. 4prime contractor directed acti’ities. Thus. onlN the prime contractor...ae’quisit~o:3 and seconcily, ,.._ 12.* Logistics Cons’sdera- t4vocias shall ,emrforri acquixtiou p’’nn~rg and tiofls rojiduct market , suveys for i..l...quantities, and (8) Other factors such as future requirements, engineering, tooling, start- * work determined by the contracting ing load costs, market

  2. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  3. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  4. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  5. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  6. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  7. Double Retort System for Materials Compatibility Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    V. Munne; EV Carelli

    2006-02-23

    With Naval Reactors (NR) approval of the Naval Reactors Prime Contractor Team (NRPCT) recommendation to develop a gas cooled reactor directly coupled to a Brayton power conversion system as the Space Nuclear Power Plant (SNPP) for Project Prometheus (References a and b) there was a need to investigate compatibility between the various materials to be used throughout the SNPP. Of particular interest was the transport of interstitial impurities from the nickel-base superalloys, which were leading candidates for most of the piping and turbine components to the refractory metal alloys planned for use in the reactor core. This kind of contaminationmore » has the potential to affect the lifetime of the core materials. This letter provides technical information regarding the assembly and operation of a double retort materials compatibility testing system and initial experimental results. The use of a double retort system to test materials compatibility through the transfer of impurities from a source to a sink material is described here. The system has independent temperature control for both materials and is far less complex than closed loops. The system is described in detail and the results of three experiments are presented.« less

  8. JOYO-1 Irradiation Test Campaign Technical Close-out, For Information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    G. Borges

    2006-01-31

    The JOYO-1 irradiation testing was designed to screen the irradiation performance of candidate cladding, structural and reflector materials in support of space reactor development. The JOYO-1 designation refers to the first of four planned irradiation tests in the JOYO reactor. Limited irradiated material performance data for the candidate materials exists for the expected Prometheus-1 duration, fluences and temperatures. Materials of interest include fuel element cladding and core materials (refractory metal alloys and silicon carbide (Sic)), vessel and plant structural materials (refractory metal alloys and nickel-base superalloys), and control and reflector materials (BeO). Key issues to be evaluated were long termmore » microstructure and material property stability. The JOYO-1 test campaign was initiated to irradiate a matrix of specimens at prototypical temperatures and fluences anticipated for the Prometheus-1 reactor [Reference (1)]. Enclosures 1 through 9 describe the specimen and temperature monitors/dosimetry fabrication efforts, capsule design, disposition of structural material irradiation rigs, and plans for post-irradiation examination. These enclosures provide a detailed overview of Naval Reactors Prime Contractor Team (NRPCT) progress in specific areas; however, efforts were in various states of completion at the termination of NRPCT involvement with and restructuring of Project Prometheus.« less

  9. California’s Shrinking Defense Contractors: Effects on Small Suppliers,

    DTIC Science & Technology

    1996-01-01

    They did not physically segregate any parts of their operations or set up a separate data management system to do business with prime contractors...of them out of business . * Small defense aerospace suppliers are not making cutting-edge products for commercial customers. Small defense aerospace...are considered critical to their primes’ supplier base are concerned. Most Firms Are Still in Business When we checked with a random sample of small

  10. All Prime Contract Awards by State or Country, Place, and Contractor, FY 84. Part 1 (Antigua - Zaire).

    DTIC Science & Technology

    1984-01-01

    AD-RI65 86 ALL PRIME CONTRACT AWARDS BY STATE OR COUNTRY PLACE AND 1/ 9 CONTRACTOR FY 84, (U) WA HINGTON HEADQUARTERS SERVICES (DOD) DC DIRECTORATE...ISPONSORING I8b. OFFICE SYMBOL 9 . PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER *ORGANIZATION I (if applicable) 8c ADDRESS (City, State, and ZIP Code) 10...number) FIELD GROUP SUB-GROUP 9 . ABSTRACT (Continue on reverse if necessary and identify by block number) ....- 00 E / ELEGT F . _,0 ISTRIBUITION

  11. Air Force B-21 Long Range Strike Bomber

    DTIC Science & Technology

    2016-04-14

    and B - 52 bombers, and would possibly replace B -2s in the future. B -21 development was highly classified until the summer of 2015, when the Air Force...Air Force had indicated that its fleet of B -1, B -2, and B - 52 bombers would suffice until 2037, when advanced technologies, such as hypersonic cruise...was the prime contractor for the B -1. Boeing was the prime contractor for the B - 52 . From FY2004 to FY2009, DOD requested more than $1.4 billion in the

  12. Design Criteria for Controlling Stress Corrosion Cracking

    NASA Technical Reports Server (NTRS)

    Franklin, D. B.

    1987-01-01

    This document sets forth the criteria to be used in the selection of materials for space vehicles and associated equipment and facilities so that failure resulting from stress corrosion will be prevented. The requirements established herein apply to all metallic components proposed for use in space vehicles and other flight hardware, ground support equipment, and facilities for testing. These requirements are applicable not only to items designed and fabricated by MSFC (Marshall Space Flight Center) and its prime contractors, but also to items supplied to the prime contractor by subcontractors and vendors.

  13. 48 CFR 48.102 - Policies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... systems research and development except where the contracting officer determines and documents the file to... prime contractor has demonstrated an effective VE program during either earlier program phases, or...: (1) Extent of the change. (2) Complexity of the change. (3) Development risk (e.g., contractor's...

  14. 48 CFR 52.203-7 - Anti-Kickback Procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 2 2014-10-01 2014-10-01 false Anti-Kickback Procedures. 52.203-7 Section 52.203-7 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Contractor, prime Contractor employee, subcontractor, or subcontractor employee for the purpose of improperly...

  15. 48 CFR 207.171-3 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... it is anticipated that a prime contract will be awarded without adequate price competition, and the prime contractor is expected to acquire any component without adequate price competition, the agency... price competition, the agency shall consider breakout of the component if substantial net cost savings...

  16. Fusion Safety Program annual report, fiscal year 1994

    NASA Astrophysics Data System (ADS)

    Longhurst, Glen R.; Cadwallader, Lee C.; Dolan, Thomas J.; Herring, J. Stephen; McCarthy, Kathryn A.; Merrill, Brad J.; Motloch, Chester C.; Petti, David A.

    1995-03-01

    This report summarizes the major activities of the Fusion Safety Program in fiscal year 1994. The Idaho National Engineering Laboratory (INEL) is the designated lead laboratory and Lockheed Idaho Technologies Company is the prime contractor for this program. The Fusion Safety Program was initiated in 1979. Activities are conducted at the INEL, at other DOE laboratories, and at other institutions, including the University of Wisconsin. The technical areas covered in this report include tritium safety, beryllium safety, chemical reactions and activation product release, safety aspects of fusion magnet systems, plasma disruptions, risk assessment failure rate data base development, and thermalhydraulics code development and their application to fusion safety issues. Much of this work has been done in support of the International Thermonuclear Experimental Reactor (ITER). Also included in the report are summaries of the safety and environmental studies performed by the Fusion Safety Program for the Tokamak Physics Experiment and the Tokamak Fusion Test Reactor and of the technical support for commercial fusion facility conceptual design studies. A major activity this year has been work to develop a DOE Technical Standard for the safety of fusion test facilities.

  17. 48 CFR 22.406-9 - Withholding from or suspension of contract payments.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Standards for Contracts Involving Construction 22.406-9 Withholding from or suspension of contract payments... contract with the same prime contractor that is subject to either Construction Wage Rate Requirements... contractor or subcontractor fails or refuses to comply with the labor standards clauses of the Construction...

  18. Alphabetic List of All DoD Prime Contractors (No Dollars), FY83.

    DTIC Science & Technology

    1983-01-01

    AIRCRAFT PARTS INC UNIVERSAL LINER OF NEW MEXICO INC UNIVERSITY FACULTY ASSOCIATES UNIVERSAL APPLICATORS INC UNIVERSAL LOGISTICS CORP UNIVERSITY MICROFILMS...LTD UNIVERSAL ASPHALT PAVING CO INC UNIVERSAL LUSITANIA MFG CORP UNIVERSITY OF HEALTH SCIENCES THE CONTRACTORS RECEIVING CONTRACTS OF S25,000 OR MORE

  19. NASA Office of Small and Disadvantaged Business Utilization

    NASA Technical Reports Server (NTRS)

    2001-01-01

    The Office of Small and Disadvantaged Business Utilization (OSDBU) within NASA promotes the utilization of small, disadvantaged, and women-owned small businesses in compliance with Federal laws, regulations, and policies. We assist such firms in obtaining contracts and subcontracts with NASA and its prime contractors. The OSDBU also facilitates the participation of small businesses in NASA's technology transfer and commercialization activities. Our driving philosophy is to consider small businesses as our products. Our customers are the NASA Enterprises, Field Centers, Functional Staff Offices, major prime contractors, and other large institutions. We hone the skills of our products to make them marketable to our customers in the performance of NASA missions.

  20. 75 FR 17919 - Submission for OMB Review; American Recovery and Reinvestment Act-Quarterly Reporting for Prime...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Recovery and Reinvestment Act--Quarterly Reporting for Prime Contractors AGENCY: Department of Defense (DOD... cumulative amount from all the reports submitted for this action will be maintained by the government's on...

  1. Supplier Assessment System (SAS)

    NASA Technical Reports Server (NTRS)

    Dietrich, Kristen

    2016-01-01

    Background: Sponsored by NASA Headquarters; Charter - provide information to assist the quality assurance community in evaluating and determining supplier risk; Comprehensive on-line repository of supplier information; Available to approved civil service personnel from all NASA Centers, other U.S. Government Agencies, Prime Contractors, and NASA direct support contractors; User access to specific data types or documents is controlled as needed.

  2. 48 CFR 252.209-7007 - Prohibited Financial Interests for Lead System Integrators.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor for the development or production of a major system, if the prime contractor is not expected at the time of award to perform a substantial portion of the work on the system and the major subsystems... for the procurement of services, the primary purpose of which is to perform acquisition functions...

  3. 76 FR 11363 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... management and oversight of a program or effort (rather than to directly furnish an end item or service to... prime contractor or any such first-tier subcontractor in furnishing end items or services of the type.... 2320, which applies to technical data, but not to computer software (which is expressly excluded from...

  4. 13 CFR 125.3 - What types of subcontracting assistance are available to small businesses?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... controlled by women. The subcontracting assistance program implements section 8(d) of the Small Business Act... percentage of total contract dollars. (3) A prime contractor has a history of unjustified untimely or reduced... disadvantaged business, or women-owned small business; and (ix) As a best practice, the contractor may provide...

  5. 48 CFR 519.7004 - Incentives for prime contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7004 Incentives for prime...) Costs incurred by a mentor to provide developmental assistance, as described in section 519.7012 to... under a GSA contract. If GSA is the mentor's responsible audit agency under FAR 42.703-1, GSA will...

  6. 40 CFR 33.302 - Are there any additional contract administration requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... faith efforts described in § 33.301 if soliciting a replacement subcontractor. (d) A recipient must require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime...

  7. 40 CFR 33.302 - Are there any additional contract administration requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... faith efforts described in § 33.301 if soliciting a replacement subcontractor. (d) A recipient must require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime...

  8. 40 CFR 33.302 - Are there any additional contract administration requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... faith efforts described in § 33.301 if soliciting a replacement subcontractor. (d) A recipient must require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime...

  9. 40 CFR 33.302 - Are there any additional contract administration requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... faith efforts described in § 33.301 if soliciting a replacement subcontractor. (d) A recipient must require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime...

  10. Current Development of Nuclear Thermal Propulsion technologies at the Center for Space Nuclear Research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robert C. O'Brien; Steven K. Cook; Nathan D. Jerred

    Nuclear power and propulsion has been considered for space applications since the 1950s. Between 1955 and 1972 the US built and tested over twenty nuclear reactors / rocket engines in the Rover/NERVA programs1. The Aerojet Corporation was the prime contractor for the NERVA program. Modern changes in environmental laws present challenges for the redevelopment of the nuclear rocket. Recent advances in fuel fabrication and testing options indicate that a nuclear rocket with a fuel composition that is significantly different from those of the NERVA project can be engineered; this may be needed to ensure public support and compliance with safetymore » requirements. The Center for Space Nuclear Research (CSNR) is pursuing a number of technologies, modeling and testing processes to further the development of safe, practical and affordable nuclear thermal propulsion systems.« less

  11. Worldwide advanced nuclear power reactors with passive and inherent safety: What, why, how, and who

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Forsberg, C.W.; Reich, W.J.

    1991-09-01

    The political controversy over nuclear power, the accidents at Three Mile Island (TMI) and Chernobyl, international competition, concerns about the carbon dioxide greenhouse effect and technical breakthroughs have resulted in a segment of the nuclear industry examining power reactor concepts with PRIME safety characteristics. PRIME is an acronym for Passive safety, Resilience, Inherent safety, Malevolence resistance, and Extended time after initiation of an accident for external help. The basic ideal of PRIME is to develop power reactors in which operator error, internal sabotage, or external assault do not cause a significant release of radioactivity to the environment. Several PRIME reactormore » concepts are being considered. In each case, an existing, proven power reactor technology is combined with radical innovations in selected plant components and in the safety philosophy. The Process Inherent Ultimate Safety (PIUS) reactor is a modified pressurized-water reactor, the Modular High Temperature Gas-Cooled Reactor (MHTGR) is a modified gas-cooled reactor, and the Advanced CANDU Project is a modified heavy-water reactor. In addition to the reactor concepts, there is parallel work on super containments. The objective is the development of a passive box'' that can contain radioactivity in the event of any type of accident. This report briefly examines: why a segment of the nuclear power community is taking this new direction, how it differs from earlier directions, and what technical options are being considered. A more detailed description of which countries and reactor vendors have undertaken activities follows. 41 refs.« less

  12. Leadership in Government Organization Change Efforts: A Multi-Case Analysis

    DTIC Science & Technology

    2004-09-01

    cleared contractor employees on short notice, in the event of demand surges. Letting go of contractor employees was considered a safer bet than...principle can be seen in the early establishment of two reactor plant-engineering laboratories. The strong, competitive capabilities of these two...personnel. The list could extend indefinitely. Application of this principle can be seen in the early establishment of two reactor plant-engineering

  13. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Exhibitors answer questions at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  14. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Information from NASA's Tech Transfer Office is on display at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  15. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    An exhibitor answers questions at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  16. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Attendees visit exhibitor booths at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  17. Strategic Management of Resource Markets: An Exploratory Study of Department of Defense Contractors.

    DTIC Science & Technology

    1982-04-01

    prime contractors focusing on (1) the operation and functional content of strategic management systems and their approaches to identifying, prioritizing...Introduction Strategic Planning for Procurement Approaches to Strategic Planning Relationship with the Procurement Process Organizational Demands Studies...planning/management with the same skill, content and commitment, what suggested improvements can come from a study of the approaches used by the more

  18. Acquisition Research Topics Catalog.

    DTIC Science & Technology

    1979-01-01

    tion maintenance, and redistribution Control levels based on standard formu- and marketing ) impact the acquisi- las will also change quite rapidly...production processes, the necessary lead times could be updated for like items based upon current market experience. By Air Force Logistics Command (AFLC...seller prime contractors are subcontracting situations has led to a growing realiza- significant portions of the prime tion that market theory

  19. James Webb Space Telescope: Supporting Multiple Ground System Transitions in One Year

    NASA Technical Reports Server (NTRS)

    Detter, Ryan; Fatig, Curtis; Steck, Jane

    2004-01-01

    Ideas, requirements, and concepts developed during the very early phases of the mission design often conflict with the reality of a situation once the prime contractors are awarded. This happened for the James Webb Space Telescope (JWST) as well. The high level requirement of a common real-time ground system for both the Integration and Test (I&T), as well as the Operation phase of the mission is meant to reduce the cost and time needed later in the mission development for re-certification of databases, command and control systems, scripts, display pages, etc. In the case of JWST, the early Phase A flight software development needed a real-time ground system and database prior to the spacecraft prime contractor being selected. To compound the situation, the very low level requirements for the real-time ground system were not well defined. These two situations caused the initial real-time ground system to be switched out for a system that was previously used by the Bight software development team. To meet the high-!evel requirement, a third ground system was selected based on the prime spacecraft contractor needs and JWST Project decisions. The JWST ground system team has responded to each of these changes successfully. The lessons learned from each transition have not only made each transition smoother, but have also resolved issues earlier in the mission development than what would normally occur.

  20. 40 CFR 35.938-9 - Subcontracts under construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean... prime contractor under a formally advertised, competitively bid, fixed price construction contract...

  1. Shoot, Move, Communicate, Purchase: How United States Special Forces Can Better Employ Money as a Weapon System

    DTIC Science & Technology

    2011-12-01

    and Suspension & Debarment Hearing, February 28, 2011, 9, http://www.wartimecontracting.gov/docs/hearing2011–02–28_testimony- Ginman.pdf (accessed...Counterinsurgency. December, 2006. Ginman, Richard T. Ensuring Contractor Accountability: Past Performance and Suspension & Debarment ...tied to the enemy. This vetting process helped debar or suspend 10 prime contractors with ties to criminal networks or the insurgency. In his written

  2. Capital Investment Motivational Techniques Used by Prime Contractors on Subcontractors

    DTIC Science & Technology

    1984-12-01

    by block number) Productivity; Profit Policy; Subcontractors; Weighted Guidelines; Profitability; Profit 20. ABSTRACT (Continue on reverse aide If...probably productivity gains that could be made if defense contractors increased their investment [6:39]. A major deterrent to the Weighted Guideline...any profit gained would be offset to some degree by a profit loss from a reduction in profit based on costs . This result is a consequence of the cost

  3. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Attendees speak to representatives from NASA's Office of Small Business Programs during Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  4. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    John Murray, chief executive officer of the Canaveral Port Authority, welcomes participants to the Kennedy Space Center's 27th Business Opportunities Expo at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  5. Industry perspectives on Plug-& -Play Spacecraft Avionics

    NASA Astrophysics Data System (ADS)

    Franck, R.; Graven, P.; Liptak, L.

    This paper describes the methodologies and findings from an industry survey of awareness and utility of Spacecraft Plug-& -Play Avionics (SPA). The survey was conducted via interviews, in-person and teleconference, with spacecraft prime contractors and suppliers. It focuses primarily on AFRL's SPA technology development activities but also explores the broader applicability and utility of Plug-& -Play (PnP) architectures for spacecraft. Interviews include large and small suppliers as well as large and small spacecraft prime contractors. Through these “ product marketing” interviews, awareness and attitudes can be assessed, key technical and market barriers can be identified, and opportunities for improvement can be uncovered. Although this effort focuses on a high-level assessment, similar processes can be used to develop business cases and economic models which may be necessary to support investment decisions.

  6. 48 CFR 30.607 - Subcontract administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract... subcontract level, the CFAO for the subcontractor shall furnish a copy of the negotiation memorandum or the... the prime contractor level. ...

  7. Issues with Access to Acquisition Data and Information in the Department of Defense: A Closer Look at the Origins and Implementation of Controlled Unclassified Information Labels and Security Policy

    DTIC Science & Technology

    2016-12-01

    at a high cost and is protected by contractual agreements between vendors and the government. Yet indiscriminate labeling of information as...federally funded research and development centers [FFRDCs], information technology [IT] support, or other contractor support). Proprietary...con- tractor originators of the information (prime contractors and subcontractors), the government, and nongovernmental entities assisting the

  8. Issues with Access to Acquisition Data and Information in the Department of Defense: A Closer Look at the Origins and Implementation of Controlled Unclassified Information Labels and Security Policy

    DTIC Science & Technology

    2016-12-19

    at a high cost and is protected by contractual agreements between vendors and the government. Yet indiscriminate labeling of information as...federally funded research and development centers [FFRDCs], information technology [IT] support, or other contractor support). Proprietary...con- tractor originators of the information (prime contractors and subcontractors), the government, and nongovernmental entities assisting the

  9. Navy Acquisition: Cost, Schedule, and Performance of New Submarine Combat Systems

    DTIC Science & Technology

    1990-01-01

    1985). Page 8 GAO/NSIAD-90-72 Submarine Combat Systems Chapter 1 Introduction In December 1983 the Navy awarded the International Business Machines...contracts to the General Electric Com- pany and the International Business Machines. In December 1987 the Navy selected General Electric as the prime...contractor and International Business Machines as the "follower" contractor. On March 31, 1988. the Navy awarded General Electric a $1.84 billion fixed

  10. 48 CFR 919.7001 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BUSINESS PROGRAMS The Department of Energy Mentor-Protege Program 919.7001 Scope of subpart. The Department of Energy (DOE) Mentor-Protege Program is designed to encourage DOE prime contractors to assist small...

  11. What We Offer | FNLCR Staging

    Cancer.gov

    Opportunities We recognize that employee benefit programs are an important part of the total compensation package, and are committed to providing you with comprehensive benefit options. The Frederick National Lab's prime contractor, Leidos Biomedi

  12. Explosive demolition of K East Reactor Stack

    ScienceCinema

    None

    2017-12-09

    Using $420,000 in Recovery Act funds, the Department of Energy and contractor CH2M HILL Plateau Remediation Company topped off four months of preparations when they safely demolished the exhaust stack at the K East Reactor and equipment inside the reactor building on July 23, 2010.

  13. Space Shuttle Project

    NASA Image and Video Library

    1977-11-18

    This photograph shows Solid Rocket Booster segments undergoing stacking operations in Marshall Space Flight Center's Building 4707. The Solid Rocket Boosters were designed in-house at the Marshall Center with the Thiokol Corporation as the prime contractor.

  14. 78 FR 42391 - Small Business Subcontracting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-16

    ... for the Jobs Act was the belief that contracting officers and prime contractors are not reporting or... for making false claims. SBA notes that the requirements that apply in the construction arena do not...

  15. Current Practices to Decrease Subcontractor Bid Shopping in the Public Sector

    DTIC Science & Technology

    1993-01-01

    rarely done because most contractors refuse to accept such a condition (6s15). Those public agencies adhering to the doctrine of promissory estoppel ...also encourage bid shopping. The doctrine of promissory estoppel dictates that a subcontractor must stand by his bid quote if it is used by the prime...Holman was not awarded the subcontract. (3) It is unfair to bind the subcontractor under promissory estoppel without binding the general contractor. (4

  16. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... a concern has claimed a 10 percent small disadvantaged business (SDB) price evaluation preference, a... would promote the purposes of the small business, 8(a), SDB, woman-owned business, or HUBZone programs...

  17. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... a concern has claimed a 10 percent small disadvantaged business (SDB) price evaluation preference, a... would promote the purposes of the small business, 8(a), SDB, woman-owned business, or HUBZone programs...

  18. 75 FR 57690 - Acquisition Regulation: Sustainable Acquisition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-22

    ... coordinate its activities with and submit required reports through the Environmental Sustainability... reports directly to the Prime Contractor's Environmental Sustainability Coordinator at the supported... reports through the Environmental Sustainability Coordinator or equivalent position. Reporting under this...

  19. 48 CFR 952.223-78 - Sustainable acquisition program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... activities with and submit required reports through the Environmental Sustainability Coordinator or... Prime Contractor's Environmental Sustainability Coordinator at the supported facility. The Subcontractor... reports through the Environmental Sustainability Coordinator or equivalent position. Reporting under this...

  20. 48 CFR 952.223-78 - Sustainable acquisition program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... activities with and submit required reports through the Environmental Sustainability Coordinator or... Prime Contractor's Environmental Sustainability Coordinator at the supported facility. The Subcontractor... reports through the Environmental Sustainability Coordinator or equivalent position. Reporting under this...

  1. 48 CFR 952.223-78 - Sustainable acquisition program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... activities with and submit required reports through the Environmental Sustainability Coordinator or... Prime Contractor's Environmental Sustainability Coordinator at the supported facility. The Subcontractor... reports through the Environmental Sustainability Coordinator or equivalent position. Reporting under this...

  2. 48 CFR 952.223-78 - Sustainable acquisition program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... activities with and submit required reports through the Environmental Sustainability Coordinator or... Prime Contractor's Environmental Sustainability Coordinator at the supported facility. The Subcontractor... reports through the Environmental Sustainability Coordinator or equivalent position. Reporting under this...

  3. What We Offer | Frederick National Laboratory for Cancer Research

    Cancer.gov

    Opportunities We recognize that employee benefit programs are an important part of the total compensation package, and are committed to providing you with comprehensive benefit options. The Frederick National Laboratory's prime contractor, Leidos

  4. Nuclear reactors built, being built, or planned, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-07-01

    This document contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1994. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually from Washington headquarters and field offices of DOE; from the US Nuclear Regulatory Commission (NRC); from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; from US and foreign embassies; and from foreign governmental nuclear departments. The book consists of three divisions, as follows: a commercial reactor locator map and tables of the characteristicmore » and statistical data that follow; a table of abbreviations; tables of data for reactors operating, being built, or planned; and tables of data for reactors that have been shut down permanently or dismantled. The reactors are subdivided into the following parts: Civilian, Production, Military, Export, and Critical Assembly. Export reactor refers to a reactor for which the principal nuclear contractor is a US company -- working either independently or in cooperation with a foreign company (Part 4). Critical assembly refers to an assembly of fuel and moderator that requires an external source of neutrons to initiate and maintain fission. A critical assembly is used for experimental measurements (Part 5).« less

  5. Nuclear reactors built, being built, or planned: 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-08-01

    This report contains unclassified information about facilities built, being built, or planned in the US for domestic use or export as of December 31, 1995. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually from Washington headquarters and field offices of DOE; from the US Nuclear Regulatory Commission (NRC); from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; from US and foreign embassies; and from foreign governmental nuclear departments. The book consists of three divisions, as follows: (1) a commercial reactor locator map and tables of the characteristicmore » and statistical data that follow; a table of abbreviations; (2) tables of data for reactors operating, being built, or planned; and (3) tables of data for reactors that have been shut down permanently or dismantled. The reactors are subdivided into the following parts: Civilian, Production, Military, Export, and Critical Assembly. Export reactor refers to a reactor for which the principal nuclear contractor is a US company--working either independently or in cooperation with a foreign company (Part 4). Critical assembly refers to an assembly of fuel and moderator that requires an external source of neutrons to initiate and maintain fission. A critical assembly is used for experimental measurements (Part 5).« less

  6. Liabilities and Responsibilities of the Construction Manager for Implementation and Management of the Safety Program.

    DTIC Science & Technology

    1987-12-01

    acting as an agent of the owner, and the owner contracts directly with several prime or trade contractors. There are four different agreements associated...safety precautions and programs in connection with the project or for the construction manager’s obligations as the agent of the owner. AIA A201/CM...require the general contractor to exercise reasonable care for safety of the subcontractor’s employees. Owners and their agents must be careful that

  7. Prime Contract Awards Over $25,000 by Major System, Contractor and State Part 1 (AAA-NAVY-AVG NAVY)

    DTIC Science & Technology

    1990-01-01

    Q-COC’) -4 M’i (a -4 c"a(aeo - ( D 0 AC 1 -ao f-.r qva 0(%Ioa.4 ()t a. c~cv(vc4 z *Za in -0f (4Jl w -44- m - .41 C,4 Ui 0 C4 IC4 P- -a l~~II I II cLE E...AO-A236 155iiiilulll l I l 1990 ANNUAL Prime Contract Awards Over $25,000 by Major System, Contractor and State Part 1 (AAA-NAVY-AVG NAVY) WHS...Special . 1 -9 __28284 pages I1 ~ . - e21 M(%I% cm -40W -4 I4 m V .. 4 mt WC)a r a- 4-r w~l w zl- qt qt V .4- 01-4 41-4 . 40 o r Lu V) c I OL 9 C U c

  8. Orbital transfer rocket engine technology: Advanced engine study

    NASA Technical Reports Server (NTRS)

    Hayden, Warren R.

    1992-01-01

    An advanced LOX/LH2 engine study for the use of NASA and vehicle prime contractors in developing concepts for manned missions to the Moon, Mars, and Phobos is documented. Parametric design data was obtained at five engine thrusts from 7.5K lbf to 50K lbf. Also, a separate task evaluated engine throttling over a 20:1 range and operation at a mixture ratio of 12 plus or minus 1 versus the 6 plus or minus 1 nominal. Cost data was also generated for DDT&E, first unit production, and factors in other life cycle costs. The major limitation of the study was lack of contact with vehicle prime contractors to resolve the issues in vehicle/engine interfaces. The baseline Aerojet dual propellant expander cycle was shown capable of meeting all performance requirements with an expected long operational life due to the high thermal margins. The basic engine design readily accommodated the 20:1 throttling requirement and operation up to a mixture ratio of 10 without change. By using platinum for baffled injector construction the increased thermal margin allowed operation up to mixture ratio 13. An initial engine modeling with an Aerojet transient simulation code (named MLETS) indicates stable engine operation with the baseline control system. A throttle ratio of 4 to 5 seconds from 10 percent to 100 percent thrust is also predicted. Performance predictions are 483.1 sec at 7.5K lbf, 487.3 sec at 20K lbf, and 485.2 sec at 50K lbf with a mixture ratio of 6 and an area ratio of 1200. Engine envelopes varied from 120 in. length/53 in. exit diameter at 7.5K lbf to 305 in. length/136 in. exit diameter at 50 K lbf. Packaging will be an important consideration. Continued work is recommended to include more vehicle prime contractor/engine contractor joint assessment of the interface issues.

  9. Fuel cell technology program contract summary report

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A fuel cell technology program which was established to advance the state-of-the-art of hydrogen-oxygen fuel cells using the P and WA PC8B technology as the base is reported. The major tasks of this program consisted of (1) fuel cell system studies of a space shuttle powerplant conceptual design (designated engineering model -1, EM-1) supported by liaison with the space shuttle prime contractors; (2) component and subsystem technology advancement and; (3) a demonstrator powerplant test. Fuel cell system studies, with the EM-1 as the focal point of design activities, included determination of voltage regulation, specific reactant consumption, weight, voltage level and performance characteristics. These studies provided the basis for coordination activities with the space shuttle vehicle prime contractor. Interface information, on-board checkout and in-flight monitoring requirements, and development cost data were also provided as part of this activity. Even though the two vehicles primes had different voltage requirements (115 volts in one case and 28 volts in the other), it was concluded that either option could be provided in the fuel cell power system by the electrical hook-up of the cells in the stack.

  10. Savannah River Site Environmental Report for 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arnett, M

    The mission at the Savannah River Site (SRS) is focused primarily on support of the national defense, nonproliferation, and environmental cleanup. SRS-through its prime operating contractor, Westinghouse Savannah River Company-continues to maintain a comprehensive environmental monitoring program.

  11. 48 CFR 3.502-2 - Subcontractor kickbacks.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... 8703(b)). [52 FR 6121, Feb. 27, 1987; 52 FR 9989, Mar. 27, 1987, as amended at 53 FR 34226, Sept. 2... contract price charged by a prime contractor to the United States. (b) Imposes criminal penalties on any...

  12. LOVE CANAL MONITORING PROGRAM. VOLUME 1

    EPA Science Inventory

    This report summarizes the prime contractor activities during the monitoring phase of the Love Canal project. Since GCA Corporation was only responsible for data collection, no analytical results appear in this report. The program involved a multifaceted sampling and analytical e...

  13. 76 FR 81940 - Submission for OMB Review; Biobased Procurements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Procurements AGENCY: Department of Defense (DOD), General Services Administration (GSA), and National... Products Under Service and Construction Contracts, is being revised to require prime contractors to report...

  14. 48 CFR 908.7106 - Security cabinets.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....7106 Section 908.7106 Federal Acquisition Regulations System DEPARTMENT OF ENERGY COMPETITION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7106 Security...) Fixed-price prime contractors and lower tier subcontractors may use GSA acquisition sources for security...

  15. 76 FR 43988 - Procurement List; Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... Sill, OK. NPAs: Professional Contract Services, Inc., Austin, TX (Prime Contractor); Work Services.... Contracting Activity: General Services Administration, Fort Worth, TX Coverage: A-List for the Total...: Department of the Army Research, Development, & Engineering Command, Natick, MA. Coverage: C-List for 100% of...

  16. 48 CFR 3.502-1 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Definitions. 3.502-1 Section 3.502-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL IMPROPER..., prime contractor employee, subcontractor, or subcontractor employee for the purpose of improperly...

  17. 48 CFR 3.502-1 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Definitions. 3.502-1 Section 3.502-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL IMPROPER..., prime contractor employee, subcontractor, or subcontractor employee for the purpose of improperly...

  18. 48 CFR 3.502-1 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Definitions. 3.502-1 Section 3.502-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL IMPROPER..., prime contractor employee, subcontractor, or subcontractor employee for the purpose of improperly...

  19. 24 CFR 200.215 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Officer. (See § 200.224) (e) Principal. (1) An individual, joint venture, partnership, corporation, trust... a project as sponsor, owner, prime contractor, Turnkey Developer, management agent, nursing home... or contract of assistance; (2) a hospital, group practice facility or nursing home; (3) cooperative...

  20. Subcontracting Opportunities with DoD Major Prime Contractors

    DTIC Science & Technology

    1996-06-01

    The Department of Defense (DoD) offers two markets for small business and small disadvantaged business seeking defense contracting and defense...opportunities. The publication exclusively addresses the defense subcontracting opportunities market. The DoD encourages small business and small disadvantaged

  1. 13 CFR 120.381 - Eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....381 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Special Purpose Loans Defense Economic Transition Assistance § 120.381 Eligibility. (a) Eligible small businesses. A small... Program on which the small business was a prime contractor, subcontractor, or supplier at any tier. (b...

  2. 13 CFR 120.381 - Eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....381 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Special Purpose Loans Defense Economic Transition Assistance § 120.381 Eligibility. (a) Eligible small businesses. A small... Program on which the small business was a prime contractor, subcontractor, or supplier at any tier. (b...

  3. 13 CFR 120.381 - Eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ....381 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Special Purpose Loans Defense Economic Transition Assistance § 120.381 Eligibility. (a) Eligible small businesses. A small... Program on which the small business was a prime contractor, subcontractor, or supplier at any tier. (b...

  4. 13 CFR 120.381 - Eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....381 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Special Purpose Loans Defense Economic Transition Assistance § 120.381 Eligibility. (a) Eligible small businesses. A small... Program on which the small business was a prime contractor, subcontractor, or supplier at any tier. (b...

  5. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY84, Part 1 (Adamsville, Alabama-Santa Clara, California).

    DTIC Science & Technology

    1984-01-01

    CITRONELLE TORRENT CORP THE 296 296 WERCO INC 25 25 TOTAL - CITRONELLE 321 321 CLAIBORNE ERNEST CONSTRUCTION COMPANY 57 57 COLUMBIANA CENTRAL ALABAMA FAB INC...WAINWRIGHT ENGRNO CO INC 136 136 WALLEY CONTRACTORS 89 89 WELDING SPECIALISTS INC 197 197 WHITESELL-GREEN INC 1,134 1,134 WILLIAMS BURT CONSTR RMDLG CO 192 192...ENi PR I S INC 35 35 IRUSSVILLE AMERADA HESS CORPORATION 16C 166 TUSCALOOSA WILLIAMS -MC WILLIAMS CC INC 1,200 1,200 MONTGOMERY AMERICANI STERILIZER

  6. Decommissioning of the Northrop TRIGA reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cozens, George B.; Woo, Harry; Benveniste, Jack

    1986-07-01

    An overview of the administrative and operational aspects of decommissioning and dismantling the Northrop Mark F TRIGA Reactor, including: planning and preparation, personnel requirements, government interfacing, costs, contractor negotiations, fuel shipments, demolition, disposal of low level waste, final survey and disposition of the concrete biological shielding. (author)

  7. 75 FR 11729 - Secretary's Order 2-2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... Order 13515, ``Increasing Participation of Asian Americans and Pacific Islanders in Federal Programs... increase the probability of participation by small businesses as prime contractors, or to facilitate small... Orders 12432 and 12928, including efforts to increase the involvement of minority businesses in the...

  8. 48 CFR 45.503 - Support property administrator findings.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Support property administrator findings. 45.503 Section 45.503 Federal Acquisition Regulations System FEDERAL ACQUISITION... property administrator findings. In instances where the prime contractor does not concur with the findings...

  9. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  10. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  11. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  12. 48 CFR 17.106-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., labor learning, and other nonrecurring costs to be incurred by an “average” prime contractor or... applicable, as plant or equipment relocation or rearrangement, special tooling and special test equipment... learning. They shall not include any costs of labor or materials, or other expenses (except as indicated...

  13. Thermionic fuel element for the S-prime reactor

    NASA Astrophysics Data System (ADS)

    Van Hagan, Thomas H.; Drees, Elizabeth A.

    1993-01-01

    Technical aspects of the thermionic fuel element (TFE) design proposed for the S-PRIME space nuclear power system are discussed. Topics covered include the rational for selecting a multicell TFE approach, a technical description of the S-PRIME TFE and its estimated performance, and the technology readiness of the design, which emphasizes techology maturity and low risk.

  14. 75 FR 61227 - Advisory Committee on Reactor Safeguards Meeting of the ACRS Subcommittee on Future Plant Designs...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-04

    ... Westinghouse Electric Company, General Electric--Hitachi Nuclear Energy (GEH), and their contractors, pursuant... NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards Meeting of the ACRS Subcommittee on Future Plant Designs; Revision to the September 24, 2010, ACRS Meeting Federal Register Notice...

  15. Orion EM-1 Booster Preps - Aft Skirt Preps/Painting

    NASA Image and Video Library

    2016-10-28

    Technicians with Orbital ATK, prime contractor for the Space Launch System (SLS) Booster, prepare the right hand aft skirt for NASA’s SLS rocket for primer and painting inside a support building at the Hangar AF facility at Cape Canaveral Air Force Station in Florida. The space shuttle-era aft skirt, was inspected and resurfaced and will be primed and painted for use on the right hand booster of the SLS rocket for Exploration Mission 1 (EM-1). NASA is preparing for EM-1, deep-space missions, and the journey to Mars.

  16. Orion EM-1 Booster Preps - Aft Skirt Preps/Painting

    NASA Image and Video Library

    2016-10-28

    Technicians with Orbital ATK, prime contractor for the Space Launch System (SLS) Booster, prepare a paint mixture for the right hand aft skirt for NASA’s SLS in a support building at the Hangar AF facility at Cape Canaveral Air Force Station in Florida. The space shuttle-era aft skirt, was inspected and resurfaced, and will be primed and painted for use on the right hand booster of the SLS rocket for Exploration Mission 1 (EM-1). NASA is preparing for EM-1, deep-space missions, and the Journey to Mars.

  17. 76 FR 68013 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-54; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... the Small Business Administration (SBA) in its Small Disadvantaged Business (SDB) regulations. The FAR... self-represent their SDB status to prime contractors in good faith when seeking Federal subcontracting opportunities. This FAR revision removed an administrative burden for SDB subcontractors to obtain SBA...

  18. 78 FR 12745 - Accelerated Payments to Small Business Subcontractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-25

    ... Business Subcontractors AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION... Prompt Payment to Small Business Subcontractors (July 11, 2012). DoD has now discontinued the temporary... assist small business prime contractors by paying them as quickly as possible after receipt of an invoice...

  19. 48 CFR 719.273-3 - Incentives for prime contractor participation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INTERNATIONAL DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The U.S. Agency for International...) Under the Small Business Act, 15 U.S.C. 637(d)(4)(E), USAID is authorized to provide appropriate incentives to encourage subcontracting opportunities for small business consistent with the efficient and...

  20. Dollar Summary of Prime Contract Awards by Contractor, State or Country, and Place, FY83, Part 2 (Gillespie Delorenzo Asla & Assocs-Planning Analysis Corp).

    DTIC Science & Technology

    1983-01-01

    BUILDERS INC WRIGHT PATTERSON AFS OHIO 202 202 263 202 a LOCKHART WILLIAM M CORP SAN DIEGO CALIFORNIA 125 125 125 125 LOCKHEED AIRCRAFT SERVICE CO ONTARIO...THOUSANDS) CONTRACTOR CITY STATE AGGREGATE ARMY NAVY AIR FORCE DLA OCE LORENZ a WILLIAMS INC WRIGHT PATTERSON AFB OHIO 021 821 821 821 LORENZ BEN ASSOCIATES...MONMOUTH NEW JERSEY 32 32 GIULIANI CONTRACTING CO MCGUIRE AFB NEW JERSEY 158 158 258 100 158 GIVENS ULTIMATE SERVICES INC WRIGHT PATTERSON AFB OHIO 194 194

  1. Safety Issues at the Defense Production Reactors. A Report to the U.S. Department of Energy.

    ERIC Educational Resources Information Center

    National Academy of Sciences - National Research Council, Washington, DC. Commission on Physical Sciences, Mathematics, and Resources.

    This report provides an assessment of safety management, safety review, and safety methodology employed by the Department of Energy (DOE) and private contractors. Chapter 1, "The DOE Safety Framework," examines safety objectives for production reactors and processes to implement the objectives. Chapter 2, "Technical Issues,"…

  2. 48 CFR 819.7105 - Incentives for prime contractor participation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... VETERANS AFFAIRS SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS VA Mentor-Protégé Program 819.7105... mentor to provide developmental assistance, as described in 819.7110 to fulfill the terms of their... mentor's responsible audit agency under FAR 42.703-1, VA will consider these costs in determining...

  3. 48 CFR 31.205-33 - Professional and consultant service costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... non-Government contracts. (8) Adequacy of the contractual agreement for the service (e.g., description... the services rendered and when not contingent upon recovery of the costs from the Government (but see... the Government, or by a prime contractor or subcontractor. (3) Any other services obtained, performed...

  4. 13 CFR 124.1001 - General applicability.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Small Disadvantaged Business (SDB). It also establishes procedures by which SBA determines whether a particular concern qualifies as an SDB in response to a protest challenging the concern's status as... represent that it is an SDB in order to receive a benefit as a prime contractor on a Federal Government...

  5. 76 FR 68044 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-54; Small Entity Compliance Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... implements revisions made by the Small Business Administration (SBA) in its Small Disadvantaged Business (SDB..., to allow SDBs to self-represent their SDB status to prime contractors in good faith when seeking Federal subcontracting opportunities. This FAR revision removed an administrative burden for SDB...

  6. 13 CFR 124.1001 - General applicability.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Small Disadvantaged Business (SDB). It also establishes procedures by which SBA determines whether a particular concern qualifies as an SDB in response to a protest challenging the concern's status as... represent that it is an SDB in order to receive a benefit as a prime contractor on a Federal Government...

  7. 13 CFR 124.1001 - General applicability.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Small Disadvantaged Business (SDB). It also establishes procedures by which SBA determines whether a particular concern qualifies as an SDB in response to a protest challenging the concern's status as... represent that it is an SDB in order to receive a benefit as a prime contractor on a Federal Government...

  8. 13 CFR 124.1001 - General applicability.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Small Disadvantaged Business (SDB). It also establishes procedures by which SBA determines whether a particular concern qualifies as an SDB in response to a protest challenging the concern's status as... represent that it is an SDB in order to receive a benefit as a prime contractor on a Federal Government...

  9. 13 CFR 124.1001 - General applicability.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Small Disadvantaged Business (SDB). It also establishes procedures by which SBA determines whether a particular concern qualifies as an SDB in response to a protest challenging the concern's status as... represent that it is an SDB in order to receive a benefit as a prime contractor on a Federal Government...

  10. LOVE CANAL MONITORING PROGRAM. GCA QA/QC (QUALITY ASSURANCE/QUALITY CONTROL) SUMMARY REPORT

    EPA Science Inventory

    One of the most important responsibilities of the Love Canal prime contractor was the institution and maintenance of a quality assurance program. An important objective of the quality assurance program was to alert the subcontractors to the importance of high quality work on thei...

  11. 48 CFR 237.102-72 - Contracts for management services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... development or production of the major system ensures that Federal employees are responsible for determining— (1) Courses of action to be taken in the best interest of the Government; and (2) Best technical performance for the warfighter; and (c) The contract requires that the prime contractor for the contract may...

  12. International Space Station (ISS)

    NASA Image and Video Library

    1997-07-20

    Photograph shows the International Space Station Laboratory Module under fabrication at Marshall Space Flight Center (MSFC), Building 4708 West High Bay. Although management of the U.S. elements for the Station were consolidated in 1994, module and node development continued at MSFC by Boeing Company, the prime contractor for the Space Station.

  13. 77 FR 56709 - Proposed Information Collection (VA Subcontracting Report for Service Disabled Veteran-Owned...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ..., Federal agencies are required to publish notice in the Federal Register concerning each proposed... response to the notice. This notice solicits comments on information needed to collect information from subcontractors to compare information obtained from subcontracting plans submitted by prime contractors in order...

  14. 1401316

    NASA Image and Video Library

    2014-09-17

    RONALD BLAKELY, ASSOCIATE DIRECTOR FOR THE WHITE HOUSE INITIATIVE ON HISTORICALLY BLACK COLLEGES AND UNIVERSITIES, SPEAKS DURING NASA’S FIRST PARTNERSHIPS MEETING FOR HISTORICALLY BLACK COLLEGES AND UNIVERSITIES AND MINORITY SERVING INSTITUTIONS. NASA’S OFFICE OF SMALL BUSINESS PROGRAMS HOSTED THE EVENT, WHICH ALLOWED REPRESENTATIVES FROM 30 NATIONWIDE UNIVERSITIES AND NASA PRIME CONTRACTORS TO DISCUSS POTENTIAL SUBCONTRACTING OPPORTUNITIES

  15. 48 CFR 17.106-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., labor learning, and other nonrecurring costs to be incurred by an “average” prime contractor or..., training, and transportation to and from the job site of a specialized work force, and unrealized labor learning. They shall not include any costs of labor or materials, or other expenses (except as indicated...

  16. 78 FR 21632 - Investigative Hearing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... goals of this hearing will be to gather additional information on the selection of the lithium ion (Li- ion) battery technology and how this new technology was evaluated, the role of the prime contractor... structure and findings of compliance for the Boeing 787 Li-ion battery system. Parties to the hearing...

  17. Prime Contractors | Division of Cancer Prevention

    Cancer.gov

    2015-2018 Efficacy and Intermediate Endpoint Biomarkers: The Research Institute of Fox Chase Cancer Center SRI International IIT Research Institute University of Texas MD Anderson Cancer Center University of Alabama at Birmingham Medical College of Wisconsin University of Oklahoma Health Sciences Center Weill Medical College of Cornell University Toxicology and Pharmacology

  18. Lessons Learned from a Tryout of Spanish and English Versions of a State Assessment.

    ERIC Educational Resources Information Center

    Stansfield, Charles W.; Kahl, Stuart R.

    The Massachusetts Comprehensive Assessment System (MCAS) is the new Massachusetts state assessment program that is being implemented in response to state education reform legislation. The paper describes the early efforts of the state Department of Education (MDOE), its prime contractor for development of the MCAS (Advanced Systems in Measurement…

  19. 48 CFR 519.7009 - Application process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7009 Application process. (a) Prime contractors interested in becoming a mentor firm must apply in writing by submitting the GSA Form 3695 to the GSA Mentor-Protégé Program Manager, at GSA Office of Small Business Utilization (E...

  20. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  1. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  2. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  3. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  4. 78 FR 70475 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-71; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    ... amends the FAR to add Croatia as a new designated country under the World Trade Organization Government Procurement Agreement (WTO GPA). Croatia joined the European Union on July 1, 2013, which is a party to the...). This new clause requires the prime contractor, upon receipt of accelerated payments from the Government...

  5. 76 FR 68026 - Federal Acquisition Regulation; Small Disadvantaged Business Self-Certification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... Business Administration (SBA) to its small disadvantaged business (SDB) program. DATES: Effective Date... disadvantaged businesses (SDBs) to self-represent their SDB status to prime contractors in good faith when... certified by the SBA as SDB firms. DoD, GSA, and NASA received no comments in response to the interim rule...

  6. Speech Quality Measurement

    DTIC Science & Technology

    1978-05-01

    Program is a cooperative venture between RADC and some sixty-five universities eligible to participate in the program. Syracuse Uiaiversity (Department...of Electrical and Computer Engineering), Purdue University (School of Electrical Engineering), Georgia Institute of Technology (School of Electrical...Engineering), and State University of New York at Buffalo (Department of Electrical / ,./. / Engineering) act as prime contractor schools with other

  7. 48 CFR 1852.219-79 - Mentor requirements and evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (Month/Year) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...

  8. 48 CFR 1852.219-79 - Mentor requirements and evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (Month/Year) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...

  9. 48 CFR 1852.219-79 - Mentor requirements and evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (Month/Year) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...

  10. 48 CFR 1852.219-79 - Mentor requirements and evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (Month/Year) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...

  11. 48 CFR 1852.219-79 - Mentor requirements and evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (MAY 2009) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...

  12. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... supervision and guarantee at the highest level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into subcontracts where the functional scope of the subcontractor's obligations is...

  13. 75 FR 34286 - Federal Acquisition Regulation; FAR Case 2009-018, Payrolls and Basic Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... removed the requirement to submit complete social security numbers and home addresses of individual... of full social security numbers and home addresses of individual workers from the prime contractor on... for each employee (e.g., the last four digits of the employee's social security number). The...

  14. TRL Assessment of Solar Sail Technology Development Following the 20-Meter System Ground Demonstrator Hardware Testing

    NASA Technical Reports Server (NTRS)

    Young, Roy M.; Adams, Charles L.

    2010-01-01

    The NASA In-Space Propulsion Technology (ISPT) Projects Office sponsored two separate, independent solar sail system design and development demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L' Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators.

  15. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    A Small Business panel discussion was held during Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. Seated at the table, from left, are Ileana Serrano, data dissemination specialist, U.S. Census Bureau; Margot Dorfman, chief executive officer, U.S. Women's Chamber of Commerce; Valerie Muck, Small Business director; U.S. Air Force; Andrew Harold, co-founder and board chairman, Florida 8(a) Alliance; and Eduardo Ramos, senior area manager, U.S. Small Business Administration. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  16. Recovery Act - Sustainable Transportation: Advanced Electric Drive Vehicle Education Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Caille, Gary

    The collective goals of this effort include: 1) reach all facets of this society with education regarding electric vehicles (EV) and plug–in hybrid electric vehicles (PHEV), 2) prepare a workforce to service these advanced vehicles, 3) create web–based learning at an unparalleled level, 4) educate secondary school students to prepare for their future and 5) train the next generation of professional engineers regarding electric vehicles. The Team provided an integrated approach combining secondary schools, community colleges, four–year colleges and community outreach to provide a consistent message (Figure 1). Colorado State University Ventures (CSUV), as the prime contractor, plays a keymore » program management and co–ordination role. CSUV is an affiliate of Colorado State University (CSU) and is a separate 501(c)(3) company. The Team consists of CSUV acting as the prime contractor subcontracted to Arapahoe Community College (ACC), CSU, Motion Reality Inc. (MRI), Georgia Institute of Technology (Georgia Tech) and Ricardo. Collaborators are Douglas County Educational Foundation/School District and Gooru (www.goorulearning.org), a nonprofit web–based learning resource and Google spin–off.« less

  17. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, FY 88. Part 16. (Prime Mover Company, The-Rodriguez General Contractors)

    DTIC Science & Technology

    1988-01-01

    W WZma t *0r- 0n4 0a 0 00 o W O~ z 00( (04 (0 �W-4 1(300 (3000 z40USr~cn70 acca (0 Z~n Zw zoo zovl0 ZNN""NNwIWO0-4 3.0( 400( .4.) ൰-4-403 000( 0...4-IN 0000 N 00aIN4-aN..o.0-0 0 a 8 MOM 1 -444.4-4400 .40.4 .4 .40100000-40000-480000000.4 0 WI O I00 F6 Go’t=s-r 0 - P. 3. P- f 0 0 ft 0 ft 0 w6ft 0 w...0.4(-0.4 r- 00 -0 0.4.40(0 4(0 r -~((4660t(006na"U)CF 4V蔾 0 D00L6 NNNNC) q 4 l 00:W r 4 00 (0000 I4 -00-4 -4 61L 4 -401 -4 f6 )0)00 00000"fl 4-0 L L

  18. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for RDT&E (Research, Development, Test and Evaluation), Fiscal Year 1976.

    DTIC Science & Technology

    1976-11-26

    section in which each contractor is located and his rank. The locations shown are those where the work was expected to be performed. Generally , the...CORP 151 B ACUPEX CORP * 72 P eENOTX CORP 2qi 8 AERCOYNE RESEARCH INC t 3’. 8 BENDIX FIELD IENGINEERING CORP 13 R AFRCJET GENERAL CORP * 42R 8 810...GFNQRAL ELECTRIC CO 33P 9 OCTY ASSCCTATFS 3 4q P GFNRFAL IkSTPUMFNT COOP 421 N DUXF UNIVERSITY * R1 P GENERAL MfTORS CORP 55 R DYNLFCTrPON CORP * 6? P

  19. The TPS Advanced Development Project for CEV

    NASA Technical Reports Server (NTRS)

    Reuther, James; Wercinski, Paul; Venkatapathy, Ethiraj; Ellerby, Don; Raiche, George; Bowman, Lynn; Jones, Craig; Kowal, John

    2006-01-01

    The CEV TPS Advanced Development Project (ADP) is a NASA in-house activity for providing two heatshield preliminary designs (a Lunar direct return as well as a LEO only return) for the CEV, including the TPS, the carrier structure, the interfaces and the attachments. The project s primary objective is the development of a single heatshield preliminary design that meets both Lunar direct return and LEO return requirements. The effort to develop the Lunar direct return capable heatshield is considered a high risk item for the NASA CEV development effort due to the low TRL (approx. 4) of the candidate TPS materials. By initiating the TPS ADP early in the development cycle, the intent is to use materials analysis and testing in combination with manufacturing demonstrations to reduce the programmatic risk of using advanced TPS technologies in the critical path for CEV. Due to the technical and schedule risks associated a Lunar return heatshield, the ADP will pursue a parallel path design approach, whereby a back-up TPS/heatshield design that only meets LEO return requirements is also developed. The TPS materials and carrier structure design concept selections will be based on testing, analysis, design and evaluation of scalability and manufacturing performed under the ADP. At the TPS PDR, the preferred programmatic strategy is to transfer the continued (detailed) design, development, testing and evaluation (DDT&E) of both the Lunar direct and LEO return designs to a government/prime contractor coordinated sub-system design team. The CEV prime contractor would have responsibility for the continued heatshield sub-system development. Continued government participation would include analysis, testing and evaluation as well as decision authority at TPS Final System Decision (FSD) (choosing between the primary and back-up heatshields) occurring between TPS PDR and TPS Critical Design Review (CDR). After TPS FSD the prime CEV contractor will complete the detailed design, certification testing, procurement, and integration of the CEV TPS.

  20. The NGST Yardstick Integrated Science Instrument Module (ISIM) Feasibility Study

    NASA Astrophysics Data System (ADS)

    Greenhouse, M. A.; NGST ISIM Team

    1999-05-01

    The Next Generation Space Telescope (NGST) Integrated Science Instrument Module (ISIM) is a distributed system consisting of a cryogenic instrument module that is integrated with the Optical Telescope Assembly (OTA) and science processors, software, and other electronics located in the Space Support Module (SSM). The ISIM system provides structure, environment, and data handling for several modular science instruments as well as several components of the OTA optics train. An ISIM baseline design and feasibility study is ongoing at GSFC. This pre-Phase A design was developed for integration with the Yardstick NGST architecture and packaging in a 5 m class EELV fairing. The goals of this study are to: [1] demonstrate mission science feasibility, [2] assess ISIM engineering and cost feasibility, [3] identify ISIM technology challenge areas,and [4] enable smart customer procurement of the NGST. In depth results from this work beyond those displayed here can be found at: http://www701.gsfc.nasa.gov/isim/isim.htm The flight ISIM will be developed by a GSFC led IPT that includes members from the STScI and, during Phase A/B, will grow to include the NGST Prime Contractor, and science instrument development teams from European, Canadian , and US science communities. Science instruments will be competitively procured from the science community, and will be integrated into the ISIM by GSFC. The flight qualified ISIM will then be delivered by GSFC to the NGST Prime Contractor for observatory level integration. At the start of NGST Phase A (Spring 1999), two competing prime contractors will begin development of separate NGST architectures, and the ISIM IPT will develop two ISIM designs corresponding to these architectures. Down selection to a single design will occur during mid 2001. The ISIM team welcomes science community feedback. Contact the IPT lead: Matt Greenhouse: matt@stars.gsfc.nasa.gov.

  1. ELECTRICAL LINES ARRIVE FROM CENTRAL FACILITIES AREA, SOUTH OF MTR. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ELECTRICAL LINES ARRIVE FROM CENTRAL FACILITIES AREA, SOUTH OF MTR. EXCAVATION RUBBLE IN FOREGROUND. CONTRACTOR CRAFT SHOPS, CRANES, AND OTHER MATERIALS ON SITE. CAMERA FACES EAST, WITH LITTLE BUTTE AND MIDDLE BUTTE IN DISTANCE. INL NEGATIVE NO. 335. Unknown Photographer, 7/1/1950 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  2. 48 CFR 519.7003 - General policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7003 General policy. (a) A large business prime contractor that meets the requirements at section 519.7006, and is approved as a mentor firm by the Mentor-Protégé Program Manager, may enter into an Agreement with a small business concern, small...

  3. 48 CFR 719.273-2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The U.S. Agency for International Development (USAID) Mentor-Prot... 124. The determination of affiliation is a function of the SBA. (a) A “Mentor” is a prime contractor... designed to enhance the business success of the Protégé. (b) “Program” refers to the USAID Mentor-Protégé...

  4. 48 CFR 3052.209-75 - Prohibited financial interests for lead system integrators.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for the development or production of a major system, if the prime contractor is not expected at the time of award to perform a substantial portion of the work on the system and the major subsystems. (4... procurement of services, the primary purpose of which is to perform acquisition functions closely associated...

  5. 14 CFR Appendix A to Part 152 - Contract and Labor Provisions

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... paragraph L need not be included in prime contracts of $2,000 or less. A. Minimum wages. (1) All mechanics... the contractor and such laborers and mechanics; and the wage determination decision(s) shall be posted... under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages...

  6. 14 CFR Appendix A to Part 152 - Contract and Labor Provisions

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... paragraph L need not be included in prime contracts of $2,000 or less. A. Minimum wages. (1) All mechanics... the contractor and such laborers and mechanics; and the wage determination decision(s) shall be posted... under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages...

  7. 14 CFR Appendix A to Part 152 - Contract and Labor Provisions

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... paragraph L need not be included in prime contracts of $2,000 or less. A. Minimum wages. (1) All mechanics... the contractor and such laborers and mechanics; and the wage determination decision(s) shall be posted... under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages...

  8. 14 CFR Appendix A to Part 152 - Contract and Labor Provisions

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... paragraph L need not be included in prime contracts of $2,000 or less. A. Minimum wages. (1) All mechanics... the contractor and such laborers and mechanics; and the wage determination decision(s) shall be posted... under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages...

  9. 14 CFR Appendix A to Part 152 - Contract and Labor Provisions

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... paragraph L need not be included in prime contracts of $2,000 or less. A. Minimum wages. (1) All mechanics... the contractor and such laborers and mechanics; and the wage determination decision(s) shall be posted... under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages...

  10. Outlook on EDRS-C

    NASA Astrophysics Data System (ADS)

    Migliore, R.; Duncan, J.; Pulcino, V.; Bourne, D.; Voegt, S.; Perez, G.

    2017-09-01

    EDRS-C will operate on a geostationary orbit as the second node of the European Data Relay System (EDRS). The EDRS-C satellite, designed by OHB System as prime contractor, has been procured in the frame of a Public Private Partnership (PPP) between Airbus Defence and Space and ESA. EDRS-C is currently under assembly at OHB facilities in Bremen.

  11. 49 CFR Appendix A to Part 23 - Uniform Report of ACDBE Participation

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... BUSINESS ENTERPRISE IN AIRPORT CONCESSIONS Pt. 23, App. A Appendix A to Part 23—Uniform Report of ACDBE... purchased by the airport itself or by concessionaires and management contractors from certified DBEs. Block... concessionaires (prime and sub) and purchases of goods and services (ACDBE and non-ACDBE combined) at the airport...

  12. 49 CFR Appendix A to Part 23 - Uniform Report of ACDBE Participation

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BUSINESS ENTERPRISE IN AIRPORT CONCESSIONS Pt. 23, App. A Appendix A to Part 23—Uniform Report of ACDBE... purchased by the airport itself or by concessionaires and management contractors from certified DBEs. Block... concessionaires (prime and sub) and purchases of goods and services (ACDBE and non-ACDBE combined) at the airport...

  13. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Register notice. (4) Decision. SBA will render its decision after the close of the comment period. If SBA decides against a change, SBA will publish notice of its decision in the Federal Register. Concurrent with the notice, SBA will advise the requester of its decision in writing. If SBA decides in favor of a...

  14. Remote Excavation of Heavily Contaminated UXO Sites

    DTIC Science & Technology

    2007-12-01

    detonation RF radio frequency RPM revolutions per minute Shaw Shaw Environmental Services SUXOS senior UXO supervisor Timberline Timberline ... Timberline Environmental Services, Inc. ( Timberline ). Timberline , and most notably Mr. Terry Northcutt, was the heart and soul of this project...the prime contractor responsible for project management and UXO support; and Timberline Environmental Services, 2 Inc. ( Timberline ) is responsible

  15. 75 FR 38684 - Federal Acquisition Regulation; FAR Case 2010-008, Recovery Act Subcontract Reporting Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ... workforce. At a minimum, the subcontractor shall provide-- (A) A brief description of the types of jobs... description may rely on job titles, broader labor categories, or the subcontractor's existing practice for... funded awards of $25,000 or more, to report jobs information to the prime contractor for reporting into...

  16. 75 FR 77739 - Federal Acquisition Regulation; Uniform Suspension and Debarment Requirement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ...-the-shelf (COTS) items; and In the case of commercial items, such term includes only the first-tier subcontracts. This has the effect, except for COTS items, of expanding the requirement of 2455(a), which states... for COTS items; subcontractors for COTS items will not be required to disclose to the prime contractor...

  17. Proceedings of the DOD/Joint Services Production Readiness Reviews Conference, Dayton, Ohio, 19-20 November 1980

    DTIC Science & Technology

    1980-01-01

    reproduction cost of data furnished to the PRR team, and (3) travel cost of prime contractor personnel traveling to subcontractor PRRs, if any. The...got our first assignment - to conduct a PRR on the CH-53E Super Stallion , heavy lift helicopter being developed by Sikorsky Aircraft. The planning

  18. Biological Filters.

    ERIC Educational Resources Information Center

    Klemetson, S. L.

    1978-01-01

    Presents the 1978 literature review of wastewater treatment. The review is concerned with biological filters, and it covers: (1) trickling filters; (2) rotating biological contractors; and (3) miscellaneous reactors. A list of 14 references is also presented. (HM)

  19. 48 CFR 519.7008 - Selection of protégé firms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7008 Selection of protégé firms. (a) Mentor firms will be solely responsible for selecting protégé firms. Mentors are encouraged to... subcontractor or a newly selected subcontractor for the prime contractor's GSA contract. (b) Mentor firms may...

  20. 48 CFR 552.219-75 - GSA Mentor-Protégé Program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false GSA Mentor-ProtégÃ....219-75 GSA Mentor-Protégé Program. As prescribed in 519.7017(a), insert the following clause: GSA Mentor-ProtéGé Program (SEP 2009) (a) Prime contractors, including small businesses, are encouraged to...

  1. 48 CFR 352.219-70 - Mentor-protégé program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Mentor-protégé program... Mentor-protégé program. As prescribed in 319.270-1(a), the Contracting Officer shall insert the following provision: Mentor-Protégé Program (January 2010) (a) Large business prime contractors serving as mentors in...

  2. A Wideband Autonomous Cognitive Radio Development and Prototyping System

    DTIC Science & Technology

    2017-11-14

    Gain, High Frequency , Circularly Polarized Planar Antenna Arrays for Space Applications”, NASA. 3. C. G. Christodoulou (Co-Principal Investigator...Investigator), “Cognitive Communications for SATCOM”, Space Vehicles (RV) University Grants Program, 04/26/16-04/25/17 ($150K), Air Force Research...Aerospace (Prime Contractor). 2. S. K. Jayaweera (Principal Investigator), “Cognitive Communications for SATCOM”, Space Vehicles (RV) University Grants

  3. 48 CFR 22.406-9 - Withholding from or suspension of contract payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... damages due the United States under the Contract Work Hours and Safety Standards Act. (See 22.302.) (1) If... the same prime contractor that is subject to either Davis-Bacon Act or Contract Work Hours and Safety... Withholdings Under the Davis-Bacon Act (40 U.S.C. 276(a)) and/or Contract Work Hours and Safety Standards Act...

  4. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for RDT&E Fiscal Year 1989

    DTIC Science & Technology

    1989-01-01

    COMPUTER SCIENCES CORPORATION 84 B AVCO RESEARCH LABORATORY INC 109 B CONTEL FEDERAL SYSTEMS INC 439 B B D SYSTEMS INC 427 B CONTRAVES GOERZ CORPORATION...2,121 Costa Mesa California 2,026 Santa Ana California 52 450 COMPRHENSIVE TECHNOLOGIES INTL S 2,109 * Chant illy Virginia 2,109 427 CONTRAVES GOERZ

  5. Aircraft

    DTIC Science & Technology

    2002-01-01

    electronics, systems integration and information technology company.39 Northrop Grumman no longer seeks a position as a prime contractor/integrator of fixed...of the spares procurement and distribution processes. Finally, they recognize that excellence in Information Technology (IT) is a strategic advantage...business in export dollars, the industry has been forced to look for new markets as worldwide aircraft sales have dropped. Because the U.S. national

  6. 49 CFR 26.53 - What are the good faith efforts procedures recipients follow in situations where there are...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TRANSPORTATION FINANCIAL ASSISTANCE PROGRAMS Goals, Good Faith Efforts, and Counting § 26.53 What are the good...: (i) The names and addresses of DBE firms that will participate in the contract; (ii) A description of... in the contract as provided in the prime contractor's commitment; and (vi) If the contract goal is...

  7. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (Month/Year) (a) Prime contractors are encouraged to participate in...

  8. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (MAY 2009) (a) Prime contractors are encouraged to participate in the...

  9. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (Month/Year) (a) Prime contractors are encouraged to participate in...

  10. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (Month/Year) (a) Prime contractors are encouraged to participate in...

  11. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (Month/Year) (a) Prime contractors are encouraged to participate in...

  12. Nuclear reactors built, being built, or planned, 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simpson, B.

    1992-07-01

    This document contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1991. The book is divided into three major sections: Section 1 consists of a reactor locator map and reactor tables; Section 2 includes nuclear reactors that are operating, being built, or planned; and Section 3 includes reactors that have been shut down permanently or dismantled. Sections 2 and 3 contain the following classification of reactors: Civilian, Production, Military, Export, and Critical Assembly. Export reactor refers to a reactor for which the principal nuclear contractor ismore » an American company -- working either independently or in cooperation with a foreign company (Part 4, in each section). Critical assembly refers to an assembly of fuel and assembly of fuel and moderator that requires an external source of neutrons to initiate and maintain fission. A critical assembly is used for experimental measurements (Part 5).« less

  13. Subaru FATS (fault tracking system)

    NASA Astrophysics Data System (ADS)

    Winegar, Tom W.; Noumaru, Junichi

    2000-07-01

    The Subaru Telescope requires a fault tracking system to record the problems and questions that staff experience during their work, and the solutions provided by technical experts to these problems and questions. The system records each fault and routes it to a pre-selected 'solution-provider' for each type of fault. The solution provider analyzes the fault and writes a solution that is routed back to the fault reporter and recorded in a 'knowledge-base' for future reference. The specifications of our fault tracking system were unique. (1) Dual language capacity -- Our staff speak both English and Japanese. Our contractors speak Japanese. (2) Heterogeneous computers -- Our computer workstations are a mixture of SPARCstations, Macintosh and Windows computers. (3) Integration with prime contractors -- Mitsubishi and Fujitsu are primary contractors in the construction of the telescope. In many cases, our 'experts' are our contractors. (4) Operator scheduling -- Our operators spend 50% of their work-month operating the telescope, the other 50% is spent working day shift at the base facility in Hilo, or day shift at the summit. We plan for 8 operators, with a frequent rotation. We need to keep all operators informed on the current status of all faults, no matter the operator's location.

  14. Solid state proton and electron mediating membrane and use in catalytic membrane reactors

    DOEpatents

    White, J.H.; Schwartz, M.; Sammells, A.F.

    1998-10-13

    This invention provides catalytic proton and electron mediating membranes useful in catalytic reactors. The membranes have an oxidation and a reduction surface and comprise a single-phase mixed metal oxide material of the formula: AB{sub 1{minus}x}B{prime}{sub x}O{sub 3{minus}y} wherein A is selected from Ca, Sr or Ba ions; B is selected from Ce, Tb, Pr, or Th ions; B{prime} is selected from Ti, V, Cr, Mn, Fe, Co, Ni, Cu, Al, Ga, or In ions, or combinations thereof; and x is greater than or equal to 0.02 and less than or equal to 0.5. The membranes can further comprise a catalyst on either the oxidation or reduction surface, or both. Membranes include those which are fabricated by combining powders of metal oxides or metal carbonates of metal A ion, metal B ion and metal B{prime} ion such that the stoichiometric ratio A:B:B{prime} is 1:1{minus}x:x where 0.2{<=}{times}0.5, repeatedly calcining and milling the combined powders until a single-phase material is obtained and pressing and sintering the single phase material to obtain a membrane. 6 figs.

  15. P-8A Poseidon Multi-Mission Maritime Aircraft (P-8A)

    DTIC Science & Technology

    2013-12-01

    NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND...2013 rated the P-8A as operationally effective , operationally suitable, and recommended Fleet introduction. Integrated testing of deficiency...lot through effective negotiations with the prime contractor and through development and implementation of production process improvement

  16. Dollar Summary of Prime Contract Awards by Contractor, State or Country, and Place, FY83, Part 3 (Planning Design & Research Engr-Zytron Corp.)

    DTIC Science & Technology

    1983-01-01

    MACNEIL CONSTR CO INC AIR FORCE ACADEMY COLORADO 77 77SCHEUNER MACNEIL CONSTR CO INC FORT CARSON COLORADO 51 51SCHEUNER MACNEIL CONSTR CO INC ALPENA ...69 69 WILSON DORIITORY MANAGEMENT CO ALPENA MICHIGAN 41 41 41 41 WILSON EXCAVATING & BLDG CONTR LEXINGTON KENTUCKY 86 86 86 86 WILSON F 5 0

  17. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY84, Part 3, (Anderson, Indiana-Winona, Mississippi).

    DTIC Science & Technology

    1984-01-01

    ALMONT ALMONT WELDING WORKS INC 102 102 ALPENA FLETCHER MOTEL 27 27 HARRYS OIL CO 65 65 HOMANT OIL CO 117 117 KOSS INDUSTRIES INC 538 538 PARSONS G S...COMPANY 108 Joe XEROX CORPORATION 59 59 ZOLNIEREK DAVID J INC 43 43 TOTAL - ALPENA 957 667 290 ANN ARBOR ADVERTEL COMMUNICATION INC 60 AMAX MATERIALS

  18. The Pittsburgh-Based Project To Train Educational R & D Personnel. Research Training Through a Multiple System Consortium, Paper Number 1.

    ERIC Educational Resources Information Center

    Heathers, Glen

    The Learning Research and Development Center at the University of Pittsburgh, as part of a consortium of 15 educational agencies, is the prime contractor for a project to design, conduct, and diffuse training programs for educational R & D personnel. Four training programs in the areas of curriculum development and the design and conduct of local…

  19. Pulling Up the Drawbridge: A Case Study of Rockwell International's Public Response Policy Following the Destruction of the Space Shuttle Challenger.

    ERIC Educational Resources Information Center

    Kaufman, John A.

    This paper describes the contingent media relations policy employed by Rockwell International, the prime contractor of the United States space shuttle program, following the 1986 destruction of the Challenger, and evaluates that policy in terms of its utility to Rockwell and its impact on public dissemination of information about the shuttle…

  20. International Cooperation in Acquisition, Technology and Logistics (IC in AT&L) Handbook

    DTIC Science & Technology

    2012-05-01

    Information exchanges, for instance, may lead to a cooperative RD&A project . Figure 1-1 illustrates this “ building block” concept of international...support the National Security Strategy, including the need to strengthen alliances and build partnerships. CWP projects are selected for their... projects : prime contractor (with international teaming of subcontractors), consortium and joint venture. The selection of the best industrial

  1. Production of Optical Quality Free Standing Diamond Wafer

    DTIC Science & Technology

    2008-05-19

    Title : Production of Optical Quality Free Standing Diamond Wafer Prime Contractor : Onyx Optics, Inc. 6551 Sierra Lane Dublin, Ca 94568...www.onyxoptics.com Program Manager : Helmuth Meissner Onyx Optics, Inc. 6551 Sierra Lane Dublin, CA 94568 Email: hmeissner@onyxoptics.com Ph: 925...PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Onyx Optics, Inc. 6551 Sierra Lane Dublin, Ca 94568 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING

  2. Data Rights Valuation in Software Acquisitions

    DTIC Science & Technology

    2012-09-01

    Practices (A. Krattiger et al.). MIHR (Oxford, UK), PIPRA (Davis, USA), Oswaldo Cruz Foundation (Fiocruz, Rio de Janeiro , Brazil), and bioDevelopments...are generally conveyed with software de - liverables (e.g., government purpose rights may be conveyed instead of only restricted rights to software...needed to purchase C-130J spare parts through competitive procurements. When the prime contractor de - clined to provide a technical data rights package

  3. Introduction to the novel verification concept of the instrument performances for the Meteosat third generation infrared sounder instrument (mtg-irs)

    NASA Astrophysics Data System (ADS)

    Freudling, M.; Egner, S.; Hering, M.; Carbó, F. L.; Thiele, H.

    2017-09-01

    The Meteosat Third Generation (MTG) Programme will ensure the future continuity and enhancement of meteorological data from geostationary orbit as currently provided by the Meteosat Second Generation (MSG) system. The industrial prime contractor for the space segment is Thales Alenia Space (France), with a core team consortium including OHB System AG (Germany).

  4. Classified Scrap in Lake Superior.

    DTIC Science & Technology

    1977-07-08

    DEPARTMENT OF THE ARMY St. Paul District, Corps of Engineers Lake Superior Area Canal Park Duluth, Minnesota 55802 THE DAILY MINING GAZETTE...ago. Lind concurred with the reference groupts recommendations that Reserve Mining Company’s discharge of 67,000 tons of taconite tailings into Lake...installation located ap- proximately 13 miles north of Minneapolis - St. Paul, Minnesota . The prime contractor at the plant is Federal Cartridge Corporation with

  5. NASA 2012 Small Business Industry Awards (SBIA)

    NASA Image and Video Library

    2013-04-23

    NASA Administrator Charles Bolden, left, NASA Associate Administrator for Small Business Programs Glenn A. Delgado, and NASA Deputy Administrator Lori Garver, right, pose for a photograph with Autumn Sellars, President/CEO of A2Research of Huntsville, Alabama after the company was awarded the Small Business Prime Contractor of the Year at NASA Headquarters, Tuesday, April 23, 2013 in Washington. Photo Credit: (NASA/Bill Ingalls)

  6. 13 CFR 126.618 - How does a HUBZone SBC's participation in a Mentor-Protégé relationship affect its participation...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... HUBZone SBC qualifies as small under part 121 of this chapter, SBA will not find affiliation between the... set forth in § 125.6(b) of this chapter. (ii) SBA may find affiliation between a prime HUBZone contractor and its mentor subcontractor where the mentor will perform primary and vital requirements of the...

  7. 13 CFR 126.618 - How does a HUBZone SBC's participation in a Mentor-Protégé relationship affect its participation...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... HUBZone SBC qualifies as small under part 121 of this chapter, SBA will not find affiliation between the... set forth in § 125.6(b) of this chapter. (ii) SBA may find affiliation between a prime HUBZone contractor and its mentor subcontractor where the mentor will perform primary and vital requirements of the...

  8. 13 CFR 126.618 - How does a HUBZone SBC's participation in a Mentor-Protégé relationship affect its participation...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... HUBZone SBC qualifies as small under part 121 of this chapter, SBA will not find affiliation between the... set forth in § 125.6(b) of this chapter. (ii) SBA may find affiliation between a prime HUBZone contractor and its mentor subcontractor where the mentor will perform primary and vital requirements of the...

  9. 13 CFR 126.618 - How does a HUBZone SBC's participation in a Mentor-Protégé relationship affect its participation...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... HUBZone SBC qualifies as small under part 121 of this chapter, SBA will not find affiliation between the... set forth in § 125.6(b) of this chapter. (ii) SBA may find affiliation between a prime HUBZone contractor and its mentor subcontractor where the mentor will perform primary and vital requirements of the...

  10. Adaptive Interfaces

    DTIC Science & Technology

    1991-03-01

    Project Engineer: Sharon M. Walter/COES/(315) 330-7650 Prime Contractor: lIT Research Institute (IITRI) 12a. DISTRIBUTION/AVAILABIUTY STATEMENT 12b...F30602- 87-D-0094. This contract is with IIT Research Institute (IITRI) and is sponsored by the Rome Air Development Center. The work was performed by... Research Institute (IITRI) and Rome Air Development Center (RADC) this Final Report for Project 7288, Adaptive Interfaces, Task A. This report is

  11. Kevlar Overwrap Study

    DTIC Science & Technology

    1992-04-01

    Manager, ARDE, INC. as Prime Contractor/Principal Investigator, Physics International as subcontractor for failure modeling computer calculations and Air...Force Astronautics Laboratory (EAFB) for full scale composite vessel testing. In addition, important contributions were made by Dr. Yen Pan...34 0 AND 22" 0 PSC VESSEL TESTS E-i E.1 - FULL SCALE COMPOSITE VESSEL E-1 TESTS - INSTRUMENTATION REQUIREMENTS/PROCEDURES E.2 - 16" 0 AND 22" 0 PSC

  12. Prime Contract Awards by Service Category and Federal Supply Classification, Fiscal Years 1973, 1974, 1975, 1976.

    DTIC Science & Technology

    1976-11-09

    most of the steel plate for ships is purchased by Defense prime contractors, and only a small portion is obtained by direct DoD purchase (see Code 9515...7.14S 9,0St U29 TRAINING OF GOVT PERSONNEL OTHER THAN U621-UG26 26, h13 4.7,63S 215,165 61,603 ’ TOTAL 86,092 116,316 333,121 145,039 V4...S5 M4AFID TOOLS 2.566 4,696 4,SS6 11,206 S2 EASURING TOOLS 1,46S LS6L 1,S94 16 a3 S3 MARONARE AND ABRASIVES 2 364Y 37,967 4.534 o.26 6 54

  13. Should PUS Standard Evolve?

    NASA Astrophysics Data System (ADS)

    Fourtier, Ph.; Nodet, J.; Garcia, G.

    2008-08-01

    Based on practical experience, the current paper presents position of Thales Alenia Space as a prime contractor, on the use of PUS standard. Questions have raised during past and present applications, which could be justifications for evolutions of the standard. This kind of reporting could be one of the entries for a reactivation of a working group on the PUS standard, taking into account significant experiences accumulated on diverse programs since early 2000.

  14. Crew Training - Apollo 9 - Grumman Aircraft Eng. Corp. (GAEC)

    NASA Image and Video Library

    1969-01-25

    S69-17615 (25 Jan. 1969) --- Astronaut Russell L. Schweickart, lunar module pilot of the Apollo 9 prime crew, participates in a press conference at the Grumman Aircraft Engineering Corporation. Grumman is the contractor to NASA for the Lunar Module. Schweickart is holding a model of a docked Lunar Module/Command and Service Modules. The Apollo 9 mission will evaluate spacecraft lunar module systems performance during manned Earth-orbital flight.

  15. Process Product Integrity Audits: A Hardware Auditing Technique for the '90s'

    NASA Technical Reports Server (NTRS)

    Taylor, Mike

    1994-01-01

    The Space Shuttle program has experienced hardware problems that have delayed several shuttle launches. A NASA review determined that the problems could have been prevented. NASA further concluded that a new kind of Quality emphasis at all Space Shuttle prime contractors and subcontractors was necessary to ensure mission success. To meet this challenge, NASA initiated an innovative review process called Process/Product Integrity (PPIA).

  16. Commercializing the transfer orbit stage

    NASA Technical Reports Server (NTRS)

    Miller, M. W.

    1984-01-01

    Key milestones necessary to establish the transfer orbit stage are examined. The selection of the project concept and synthesis of the company are described followed by an analysis venture capability support and the selection of a major aerospace company as prime contractor. A landmark agreement with NASA sanctioned the commercial TOS concept and provided the critical support necessary to raise the next round of venture capital. Project management and customer commitments are also discussed.

  17. A Modular and Configurable Instrument Electronics Architecture for "MiniSAR"- An Advanced Smallsat SAR Instrument

    NASA Astrophysics Data System (ADS)

    Gomez, Jaime; Pastena, Max; Bierens, Laurens

    2013-08-01

    MiniSAR is a Dutch program focused on the development of a commercial smallsat featuring a SAR instrument, led by SSBV as prime contractor. In this paper an Instrument Electronics (IEL) system concept to meet the MiniSAR demands is presented. This system has several specificities wrt similar initiatives in the European space industry, driven by our main requirement: keep it small.

  18. Composite Ceramic Superconducting Wires for Electric Motor Applications

    DTIC Science & Technology

    1989-07-07

    generators that have been built using NbTi superconducting wire at liquid 3 helium temperature (4.2*K). Most of these magnets , motors, and generators have...temperature superconductors. A magnetic diffusivity value cannot be rigorously determined for the superconductor in the superconducting state when flux jump...cv, FIRST ANNUAL REPORT FOR THE PROJECT "COMPOSITE CERAMIC SUPERCONDUCTING WIRES FOR ELECTRIC MOTOR APPLICATIONS" 2 PRIME CONTRACTOR CERAMICS PROCESS

  19. JCL Implementation On A Human Spaceflight Program

    NASA Technical Reports Server (NTRS)

    Kulpa, Vyga; Karpowich, Mike; Abel, Diana; Archiable, Wes; Carson, William

    2013-01-01

    Joint Confidence Level (JCL) analysis focuses on the integration of traditionally stove-piped programmatic components (schedule, cost and risk) to establish projected resource and schedule requirements at various confidence levels and to identify programmatic cost and schedule risk drivers. SLS Program consists of multiple Prime Contractors managed by independent SLS Elements which are integrated using SE&I and Program Management. SLS further integrates with GSDO and MPCV through ESD integrated working groups.

  20. DoD Source Selection: Competencies, Deficiencies, and Remedies

    DTIC Science & Technology

    2014-04-30

    University, Ministry of National Defense, Republic of China Strategic Planning and Management in Defense Systems Acquisition Stanley Rosen, Defense... systems procurement officer. He was employed in purchasing management for prime contractors on NASA’s Hubble Space Telescope, DoE’s Positron Electron...was living the good life, “he … was squandering precious tax dollars for, among other things, systems the military didn’t ask for, didn’t need and

  1. Can Profit Policy and Contract Incentives Improve Defense Contract Outcomes?

    DTIC Science & Technology

    2008-10-01

    a metric that estimates the returns required by investors. The weighted average cost of capital ( WACC ) is the standard financial statistic that...weights the returns demanded by investors that hold equity and investors that hold debt.6 Like FCFROIC, WACC is expressed as a percentage. Consequently...previous year. 5 These defense prime contractors include Lockheed, Raytheon, Northrop Grumman, and General Dynamics. 6 Mathematically, WACC = Debt/(Debt

  2. Artist concept of the Hubble Space Telescope (HST) after STS-31 deployment

    NASA Image and Video Library

    1988-09-21

    Artist concept shows the Hubble Space Telescope (HST) placed in orbit above the Earth's distorting layer of atmosphere by Discovery, Orbiter Vehicle (OV) 103, during mission STS-31. Tracking and data relay satellite (TDRS) is visible in the background and ground station is visible below on the Earth's surface. HST is the first of the great observatories to go into service and one of NASA's highest priority scientific spacecraft. Capable of observing in both visible and ultraviolet wavelengths, HST has been termed the most important scientific instrument ever designed for use on orbit. It will literally be able to look back in time, observing the universe as it existed early in its lifetime and providing information on how matter has evolved over the eons. The largest scientific payload ever built, the 12 1/2-ton, 43-foot HST was developed by Lockheed Missiles & Space Company, spacecraft prime contractor, and Perkin-Elmer Corporation, prime contractor for the optical assembly. The European Space Agency (ESA) furnished the power generating solar array and one of the system's five major instruments. Marshall Space Flight Center (MSFC) manages the HST project; Goddard Space Flight Center (GSFC) will be responsible, when the spacecraft is in orbit, for controlling the telescope and processing the images and instrument data returns.

  3. All Prime Contract Awards by State or Country, Place, and Contractor, FY83, Part 2 (Kingman, Arizona-Petaluma, California).

    DTIC Science & Technology

    1983-01-01

    2610 000 A48 TIRES & TUBES PNEUMATIC EXCE 5 A 3 3 A 0000 0 J 1 A 42 4 )7 2017 DAAEO7-83-CO156 B C A 5 2 2 2610 000 A4B TIRES & TUBES PNEUMATIC EXCE 5 A...OAAO3 0037 OAAAO3-63-CO028 B C B 5 2 2 5610 000 B1 MINERAL CONSTRUCTION MATERIA 8 A 3 4 J O1B 1B J 1 B 32 COOPER TIRE & RUBBER CO TEXARKANA ARKANSAS...PNEUMATIC EXCE 5 A 3 3 J 0000 0 J 1 G 136 CONTRACTOR TOTAL 7 2,224 RIO AIR SERVICE INC TEXARKANA ARKANSAS 089236 3950 04 4 B 00600 1731 DLAeOO-82

  4. All Prime Contract Awards by State or Country, Place, and Contractor, FY83, Part 4 (Washington, D.C.-Lafayette, Indiana).

    DTIC Science & Technology

    1983-01-01

    6 3 J 0000 0 J 1 E 31 DADE AUTO PARTS CECIL FIELD NAS FLORIDA 078626 0585 10 2 K T4O? 0001 NOO612-61-DOT3S B C B 5 2 2 2990 000 A45 MISC ENGINE...INC JACKSONVILLE FLORIDA 002436 1740 10 0 TAIlO 0050 NOSB36-83-DO006 A C C 5 2 2 R399 000 S1 OTHER ADP SERVICES 8 A 4 4 J 018 1 B J I A 81 DE AUTO ...000 C9E BOOKS AND PAMPHLETS 3 6 4 1 J 80 CONTRACTOR TOTAL 3 216 ZIEBART AUTO RUSTPROOFING MI SHAWAK ATLANTA GEORGIA 089890 0290 11 1 I OHA09 0006

  5. Nuclear reactors built, being built, or planned 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-08-01

    This publication contains unclassified information about facilities, built, being built, or planned in the United States for domestic use or export as of December 31, 1996. The Office of Scientific and Technical Information, U.S. Department of Energy, gathers this information annually from Washington headquarters, and field offices of DOE; from the U.S. Nuclear Regulatory Commission (NRC); from the U. S. reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; from U.S. and foreign embassies; and from foreign governmental nuclear departments. The book consists of three divisions, as follows: (1) a commercial reactor locator map and tables ofmore » the characteristic and statistical data that follow; a table of abbreviations; (2) tables of data for reactors operating, being built, or planned; and (3) tables of data for reactors that have been shut down permanently or dismantled.« less

  6. Multiphase organic synthesis in microchannel reactors.

    PubMed

    Kobayashi, Juta; Mori, Yuichiro; Kobayashi, Shū

    2006-07-17

    "Miniaturization" is one of the most important aspects in today's technology. Organic chemistry is no exception. The search for highly effective, controllable, environmentally friendly methods for preparing products is of prime importance. The development of multiphase organic reactions in microchannel reactors has gained significant importance in recent years to allow novel reactivity, and has led to many fruitful results that are not attainable in conventional reactors. This Focus Review aims to shed light on how effectively multiphase organic reactions can be conducted with microchannel reactors by providing examples of recent remarkable studies, which have been grouped on the basis of the phases involved.

  7. ETR COMPLEX. CAMERA FACING SOUTH. FROM BOTTOM OF VIEW TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ETR COMPLEX. CAMERA FACING SOUTH. FROM BOTTOM OF VIEW TO TOP: MTR, MTR SERVICE BUILDING, ETR CRITICAL FACILITY, ETR CONTROL BUILDING (ATTACHED TO ETR), ETR BUILDING (HIGH-BAY), COMPRESSOR BUILDING (ATTACHED AT LEFT OF ETR), HEAT EXCHANGER BUILDING (JUST BEYOND COMPRESSOR BUILDING), COOLING TOWER PUMP HOUSE, COOLING TOWER. OTHER BUILDINGS ARE CONTRACTORS' CONSTRUCTION BUILDINGS. INL NEGATIVE NO. 56-4105. Unknown Photographer, ca. 1956 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  8. Applications of plasma core reactors to terrestrial energy systems

    NASA Technical Reports Server (NTRS)

    Latham, T. S.; Biancardi, F. R.; Rodgers, R. J.

    1974-01-01

    Plasma core reactors offer several new options for future energy needs in addition to space power and propulsion applications. Power extraction from plasma core reactors with gaseous nuclear fuel allows operation at temperatures higher than conventional reactors. Highly efficient thermodynamic cycles and applications employing direct coupling of radiant energy are possible. Conceptual configurations of plasma core reactors for terrestrial applications are described. Closed-cycle gas turbines, MHD systems, photo- and thermo-chemical hydrogen production processes, and laser systems using plasma core reactors as prime energy sources are considered. Cycle efficiencies in the range of 50 to 65 percent are calculated for closed-cycle gas turbine and MHD electrical generators. Reactor advantages include continuous fuel reprocessing which limits inventory of radioactive by-products and thorium-U-233 breeder configurations with about 5-year doubling times.-

  9. Counterfeit Parts: DOD Needs to Improve Reporting and Oversight to Reduce Supply Chain Risk

    DTIC Science & Technology

    2016-02-01

    the cost accounting standards board under 41 U.S.C. § 1502. 8DOD implemented its cost principle that costs are not allowable unless 1) the...February 2016 GAO-16-236 United States Government Accountability Office United States Government Accountability Office Highlights of GAO-16-236, a...apply to prime contractors subject to cost accounting standards on acquisitions other than small business set-asides. The cost accounting standards are

  10. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for RDT&E (Research, Development, Test and Evaluation), Fiscal Year 1982.

    DTIC Science & Technology

    1982-01-01

    CONTRAVES GOEPZ CORP 309 8 FAIRCHILD CAMERA & INSTRUMENT CORP 101 B CONTROL DATA CORP 79 B FAIRCHILD INDUSTRIES IN^ 173 N CORNELL UN "’RSITY 249 B...MASS 530 383 MEGAPULSE INC S 1,276 - BEDFORD MASS 1.276 360 OPTI METRICS INC S 1,4S5 ANN ARSOR MICHIGAN 433 385 CONTRAVES GOERZ CORP 1,266 WHITE

  11. Effect of Prime Contractor Financial Position on Major Weapon System Cost and Delivery Performance

    DTIC Science & Technology

    1990-12-01

    financial healh , before before and during both development and production phases of a program. Major findings indicate that a relationship does exist...curves were constructed for 35 major military aircraft and missile weapon systems to operationalize the concept of pricing strategy. [Ref. 4:p. 14]. To...Meaningfulness of coefficients, i.e., predictors must have "correct" coefficient signs. The following discriminarit model resulted: Concept Ratio

  12. Tackling sun intrusion: a challenge of close collaboration of thermal, mechanical, structural and optical engineers

    NASA Astrophysics Data System (ADS)

    Kroneberger, Monika; Calleri, Andrea; Ulfers, Hendrik; Klossek, Andreas; Goepel, Michael

    2017-09-01

    The Meteosat Third Generation (MTG) program will ensure the continuity and enhancement of meteorological data from geostationary orbit as currently provided by the Meteosat Second Generation (MSG) system. OHB-Munich, as part of the core team consortium of the industrial prime contractor for the space segment Thales Alenia Space (France), is responsible for the Flexible Combined Imager - Telescope Assembly (FCI-TA) as well as the Infrared Sounder (IRS).

  13. Intelsat satellite scheduled for launch

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The launch schedule for Intelsat 5-B, the prime Intelsat satellite to provide communications services between the Americas, Europe, the Middle East, and Africa, is presented. The planned placement of the satellite into an elliptical transfer orbit, and circularization of the orbit at geosynchronous altitude over the equator are described. Characteristics of the Atlas Centaur launch vehicle, AC-56, are given. The launch operation is summarized and the launch sequence presented. The Intelsat team and contractors are listed.

  14. Establishing a Product Baseline for Global Positioning System Satellites through Functional and Physical Configuration Audits

    DTIC Science & Technology

    2011-09-01

    PBL may see changes as the design is actually implemented . Such changes are typically for practical reasons of adapting to either specific...shall use a configuration management approach to establish and control product attributes and the product baseline across the total system life cycle... practice that helps prevent government interference in subcontracts, holds the prime contractor accountable for their end product (s), limits the potential

  15. Orion European Service Module (ESM) Development, Integration and Qualification Status

    NASA Technical Reports Server (NTRS)

    Berthe, Philippe; Over, Ann P.; Picardo, Michelle; Byers, Anthony W.

    2017-01-01

    ESA and the European Industry are supplying the European Service Module for Orion. An overview of the system and subsystem configuration of the Orion European Service Module (ESM) as designed and built for the EM-1 mission is provided as well as an outline of its development, assembly, integration and verification process performed by ESA and NASA in coordination with their respective Industrial prime contractors, Airbus Defence and Space and Lockheed Martin.

  16. Town Hall Meeting Presentation

    NASA Technical Reports Server (NTRS)

    Mather, John C.

    2002-01-01

    The James Webb Space Telescope (JWST), formerly known as the Next Generation Space Telescope (NGST), will be the successor to the Hubble Space Telescope. It will carry 3 instruments to a deep space orbit around the Sun-Earth Lagrange point L2, and will cover the wavelength range from 0.6 to 28 microns. The design concepts and current status of the project will be summarized, including the telescope and observatory contract proposed by the new prime contractor, TRW.

  17. Feds deed Ward Valley site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-06-12

    This article is a review of the efforts to site a low-level waste repository in California. To resolve a long-running dispute, the US Government has agreed to deed to the state 1000 acres of land in the Mohave Desert. It was noted that environmentalists are unhappy with this action, and it was also noted by the prime contractor (US Ecology) that the facility can be finished six to nine months after the legal challenges are finished.

  18. Improvement of anaerobic digestion performance by continuous nitrogen removal with a membrane contactor treating a substrate rich in ammonia and sulfide.

    PubMed

    Lauterböck, B; Nikolausz, M; Lv, Z; Baumgartner, M; Liebhard, G; Fuchs, W

    2014-04-01

    The effect of reduced ammonia levels on anaerobic digestion was investigated. Two reactors were fed with slaughterhouse waste, one with a hollow fiber membrane contractor for ammonia removal and one without. Different organic loading rates (OLR) and free ammonia and sulfide concentrations were investigated. In the reactor with the membrane contactor, the NH4-N concentration was reduced threefold. At a moderate OLR (3.1 kg chemical oxygen demand - COD/m(3)/d), this reactor performed significantly better than the reference reactor. At high OLR (4.2 kg COD/m(3)/d), the reference reactor almost stopped producing methane (0.01 Nl/gCOD). The membrane reactor also showed a stable process with a methane yield of 0.23 Nl/g COD was achieved. Both reactors had predominantly a hydrogenotrophic microbial consortium, however in the membrane reactor the genus Methanosaeta (acetoclastic) was also detected. In general, all relevant parameters and the methanogenic consortium indicated improved anaerobic digestion of the reactor with the membrane. Copyright © 2014 Elsevier Ltd. All rights reserved.

  19. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, FY83, Part 6 (Johnson Textile & Plastics Co-McKee Robert E Gen Contractor).

    DTIC Science & Technology

    1983-01-01

    M15 0 INC TEXARKANA TEXAS 093818 7840 44 147-83-C0101 D C E 1 2 2 Y129 000 C2 CONSTRUCTION/OTHER AIRFIELD 8 A 3 4 J 018 1 B J 1 1 76 JOWETT INC 147...RENTAL OF EQ/ADP EQUIP 8 A 4 5 J 1013 5 B J 1 I 3u. KETRON INC ION TOTAL 3 825 2 F D2701 1053 N00039-8, 2 D PAlO 1345 N00140- TEXARKANA TEXAS 029859...F4265C KIEBCO FOODS INC 1 4 J 0013H 2017 DLA131 4 J 0013H 2026 DLA13) .1STING OCTOBER - SEPTEMBER FY 83. PAGE 4137 MPC613 ALPHABETIC I I SM 222 V 0

  20. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, FY83, Part 9 (Smith S J Co Inc-Univar Corp).

    DTIC Science & Technology

    1983-01-01

    PURPOSE 3 6 4 1 H LOCATION TOTAL 2 65 SOFIS EQUIPMENT CO TEXARKANA TEXAS 088852 7840 44 1 A OAG47 0059 DAAG47-83-CO022 0 C E 1 3 2 Y159 000 C2...8905 000 52 MEAT POULTRY AND FISH 6 2 3 5 J 09 1 B I I LOCATION TOTAL 19 1,205 SOFTWARE ASSOCIATES INC TEXARKANA TEXAS 018565 7840 44 1 I 0A347 0191...CONTRACTORS INC TEXARKANA TEXAS 070213 7840 44 1C 0AG47 0095 DAAG47-83-CO033 D C E 1 2 2 Z152 000 C2 MAINT-REPAIR-ALTER/MAINTENAN 8 A 3 4 J O1B I B J 1 C 132

  1. Korea Earth Observation Satellite Program

    NASA Astrophysics Data System (ADS)

    Baek, Myung-Jin; Kim, Zeen-Chul

    via Korea Aerospace Research Institute (KARI) as the prime contractor in the area of Korea earth observation satellite program to enhance Korea's space program development capability. In this paper, Korea's on-going and future earth observation satellite programs are introduced: KOMPSAT- 1 (Korea Multi Purpose Satellite-1), KOMPSAT-2 and Communication, Broadcasting and Meteorological Satellite (CBMS) program. KOMPSAT-1 satellite successfully launched in December 1999 with Taurus launch vehicle. Since launch, KOMPSAT-1 is downlinking images of Korea Peninsular every day. Until now, KOMPSAT-1 has been operated more than 2 and half years without any major hardware malfunction for the mission operation. KOMPSAT-1 payload has 6.6m panchromatic spatial resolution at 685 km on-orbit and the spacecraft bus had NASA TOMS-EP (Total Ozone Mapping Spectrometer-Earth Probe) spacecraft bus heritage designed and built by TRW, U.S.A.KOMPSAT-1 program was international co-development program between KARI and TRW funded by Korean Government. be launched in 2004. Main mission objective is to provide geo-information products based on the multi-spectral high resolution sensor called Multi-Spectral Camera (MSC) which will provide 1m panchromatic and 4m multi-spectral high resolution images. ELOP of Israel is the prime contractor of the MSC payload system and KARI is the total system prime contractor including spacecraft bus development and ground segment. KARI also has the contract with Astrium of Europe for the purpose of technical consultation and hardware procurement. Based on the experience throughout KOMPSAT-1 and KOMPSAT-2 space system development, Korea is expecting to establish the infrastructure of developing satellite system. Currently, KOMPSAT-2 program is in the critical design stage. are scheduled to launch in 2008 and in 2014, respectively. The mission of CBMS consists of two areas. One is of space technology test for the communications mission, and the other is of a real- time environmental observation for meteorological mission on the geosynchronous orbit for public services. The CBMS is expected to weigh about 2 ~ 2.5 tons, and 6 channels of Ka-band and S- band transponder are equipped for communications service and observation payloads such as meteorological and ocean sensors. To increase the reliability of the first CBMS, a cooperative development with advanced foreign companies of the space business is being considered.

  2. Space power reactor in-core thermionic multicell evolutionary (S-prime) design

    NASA Astrophysics Data System (ADS)

    Determan, William R.; Van Hagan, Tom H.

    1993-01-01

    A 5- to 40-kWe moderated in-core thermionic space nuclear power system (TI-SNPS) concept was developed to address the TI-SNPS program requirements. The 40-kWe baseline design uses multicell Thermionic Fuel Elements (TFEs) in a zirconium hydride moderated reactor to achieve a specific mass of 18.2 We/kg and a net end-of-mission (EOM) efficiency of 8.2%. The reactor is cooled with a single NaK-78 pumped loop, which rejects the heat through a 24 m2 heat pipe space radiator.

  3. Missile Defense: Assessment of DODs Reports on Status of Efforts and Options for Improving Homeland Missile Defense

    DTIC Science & Technology

    2016-02-17

    However, MDA may encounter challenges with the RKV’s contract strategy, industry collaboration efforts, and schedule because MDA has not yet...negotiated the terms of the RKV modification with the prime contractor, is relying on potential industry competitors to collaborate on developing the RKV...interfaces and standards for its subsystems, called modules. Under the DSC, MDA plans to form a cross industry team consisting of Boeing, Raytheon, and

  4. Total Quality Management in Space Shuttle Main Engine manufacturing

    NASA Technical Reports Server (NTRS)

    Ding, J.

    1992-01-01

    The Total Quality Management (TQM) philosophy developed in the Marshall Space Flight Center (MSFC) is briefly reviewed and the ongoing TQM implementation effort which is being pursued through the continuous improvement (CI) process is discussed. TQM is based on organizational excellence which integrates the new supportive culture with the technical tools necessary to identify, assess, and correct manufacturing processes. Particular attention is given to the prime contractor's change to the organizational excellence management philosophy in SSME manufacturing facilities.

  5. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for RDT&E (Research, Development, Test and Evaluation), Fiscal Year 1975.

    DTIC Science & Technology

    1975-01-01

    NEN ENGLAND EOUTPHENT CO INC • 269 8 PULSEPONER SYSTENS INC TPA N NEW NEXICO INSTITUTE WINING + TECH * 151 N PUROUE RESEARCH FOUNDATION q- NMEN MEXICO...ANAQOSf S u SHALL USyNeESS -1T -- U - - e* I.- U~ SE~tION I -U.S. aUSINEsS 3 IRMS FISCAL Ville 1979 RawN low Or G.ATOR THOUSANOS . 044K NAME OF

  6. Proceedings of the Systems Reengineering Technology Workshop (4th) held in Monterey, California on February 8 - 10, 1994

    DTIC Science & Technology

    1994-09-01

    report for the Properties of User Interface Software Architetures ", draft DISCUS Working Group, Programmers Tutorial, MITRE paper, SEI. Carnegie...execution that we have defined called asynchronous remote procedure call (ARPC) [15], which allows concurrency in amounts proportional to the amount of...demonstration project to use STARS DoD software budget and the proportion concepts. IBM is one of the prime is expected to be increased during the contractors

  7. Driving Technological Surprise: DARPA’s Mission in a Changing World

    DTIC Science & Technology

    2013-04-01

    a plethora of new weapons and techniques in the hands of many types of actors can and do threaten our way of life and endanger our democracy in...global affairs. And a look into the future only adds uncertainty. The proliferation of nuclear, chemical, and biological weapons of mass destruction...electronic device is likely to get to the Warfighter when a prime contractor incorporates it into a weapon system development contract. In some cases, the

  8. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place. Part 10 (Germer Equipment Co-Hamilton Hilton National Wembley)

    DTIC Science & Technology

    1990-01-01

    m’ 1) 00 00 00 m 1-r 0" ’m2 II ON ’r- - .- - C LOOcOaOC C> CC’m CI- t t mI ’U ’r 0(1 )0 - LN U L6 L, -4 0)C𔃼C𔃼( MPC4 C-’UN L 400 01-41 m2 T "O ’U 0

  9. NASTRAN users' experience of Avco Aerostructures Division

    NASA Technical Reports Server (NTRS)

    Blackburn, C. L.; Wilhelm, C. A.

    1973-01-01

    The NASTRAN experiences of a major structural design and fabrication subcontractor that has less engineering personnel and computer facilities than those available to large prime contractors are discussed. Efforts to obtain sufficient computer capacity and the development and implementation of auxiliary programs to reduce manpower requirements are described. Applications of the NASTRAN program for training users, checking out auxiliary programs, performing in-house research and development, and structurally analyzing an Avco designed and manufactured missile case are presented.

  10. Why I Won’t Be a Prime Contractor

    DTIC Science & Technology

    2015-02-01

    notes, see “Contra Proferentem and the Christian Doctrine,” below.) Rules: Uniform Commercial Code ( UCC )—270 pages Note: The UCC deals with multiple...Christian Doctrine,” below.) Rate of Rule Change: Article 2 of the UCC was issued in 2002. Potential Solicitation Provisions and Contract Clauses that may...excluding alternates: UCC 0 Notes: • On two occasions in the last four years, I have had written contracts containing clauses. One of those two

  11. A Management Strategy for the Naval Administrative Telephone System,

    DTIC Science & Technology

    1985-03-01

    story [Ref. 17]: " What the government wants is a one-stop telecommunica- tions company1 operated by a single prime contractor, that can provide and...examines the various system and environmental factor which impact upon a selection of a management strategy, and with- in the constraints imposed by...resolution technique embodied in the age-old adage "divide and conquer." The key premise of this technique is that if a complex ( macro -) problem is

  12. KSC-2012-3111

    NASA Image and Video Library

    2012-05-23

    CAPE CANAVERAL, Fla. – Joanne Maguire, executive vice president of Space Systems for Lockheed Martin, and Kennedy Space Center Director Bob Cabana, far right, are accompanied by Lockheed Martin and NASA personnel during a tour of Kennedy's Operations and Checkout Building. Lockheed Martin is the prime contractor to NASA for the Orion Multi-Purpose Crew Vehicle, which will be processed in the refurbished Operations and Checkout building. For more information, visit http://www.nasa.gov/exploration/systems/ground. Photo credit: NASA/Jim Grossmann

  13. KSC-2012-3112

    NASA Image and Video Library

    2012-05-23

    CAPE CANAVERAL, Fla. – Lockheed Martin and NASA personnel accompany Joanne Maguire, executive vice president of Space Systems for Lockheed Martin, and Kennedy Space Center Director Bob Cabana, far right, during a tour of Kennedy's Operations and Checkout Building. Lockheed Martin is the prime contractor to NASA for the Orion Multi-Purpose Crew Vehicle, which will be processed in the refurbished Operations and Checkout building. For more information, visit http://www.nasa.gov/exploration/systems/ground. Photo credit: NASA/Jim Grossmann

  14. Prime Contract Awards Over $25,000 by Major System, Contractor and State, FY83.

    DTIC Science & Technology

    1983-01-01

    SERVICES 3,074 VO R513 STUDIES/FEASIBILITY - NON- CONSTRUCTION 125 VO T013 TECHNICAL WRITING 1,347 VO 1560 AIRFRAME STRUCTURAL COMPONENTS 6,825 VO 1620...INC NCAR 1670 PARACHUTES RECOVERY SYS AND TIE DOWN EQ 49 ROCKWELL INTERNATIONAL CORP CALIF Y19 CONSTR: CONSTRUCTION /OTHER AIRFIELD STRUCTURES 28,480...INC NEW Y 1560 AIRFRAME STRUCTURAL COMPONENTS 36 GANAR INDUSTRIES I NC CALIF 1680 MISCL AIRCRAFT ACCESSORIES COMPONENTS 180 GARRETT CONSTRUCTION CO

  15. Alphabetic List of All DoD Prime Contractors (No Dollars), FY84.

    DTIC Science & Technology

    1984-01-01

    ALDEN SALES CO ALFRED A YEE DIV LEO A DALY ALBERICI J S CONSTRUCTION CO ALDER FOOD DISTRIBUTORS ALFRED KAERCHER, ALBERS BOB CONSTRUCTION INC ALDERMAN...LABORATORIES INC BISSON LUCIEN INC BILDON INC BIOMETALLICS BITO LAGERTECHNIK BITTMANN GMB BILFINGER & BERGER BIONETICS CORP THE BITTINGER W E CO BILKE OIL CO...ROOT INC BROWN LEARY INC BROOK PETROLEUM INC BROWN & SHARPE INTL CAPITAL BROWN LEO CONSTRUCTION CO INC BROOKDALE COMMUNITY BROWN & SHARPE MFG CO

  16. Dollar Summary of Prime Contract Awards by Contractor, State or Country, and Place, FY84, Part 6, (Magnasync/Moviola Corp-Parker Marine Contracting).

    DTIC Science & Technology

    1984-01-01

    11111220 11111_L 5 . 1161 ]lllI ’° lh Ŝ MICROCOPY RESOLUTION TESI CHART N10iANAL hR111 I~ A S-7 DOLLAR SUMMARY OF PRIME CONTRACT AWARDS BY...STATE ill C!I- 0C’ 83 -- 0A9/ 1 392.’ u ’൛ / R ,’ :,q u 1 1’ LIM i -I EE; IF < _ . I’MN DE ’, CCLt , ,. DE SERVICE C O CRANO CjRiɠ AR 6 0 N DAKY1...8217:CCFORTECFORT LAJI)FRJALr <CI I DE INOROATDPANAMA C’T" FL OR ID W. 053 * ICORPORATED POMERET Mfl AN 34- N;CCPORA TED ROCKVILLE MAP)YlAN .:I 2 IlOPF’RATED NEwp)RT

  17. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, FY83, Part 10 (Universal Aircraft Parts Inc-Zytron Corp).

    DTIC Science & Technology

    1983-01-01

    FIELDS & ALI 33-88 B C B 5 2 2 J070 000 A7 MAINT-REPAIR OF EQ/ADP EQUIP 3 6 4 1 1 K OCAO 0029 DAC , 33-88 B C A 5 3 2 W070 000 $1 LEASE-RENTAL OF EQ...D OCW63 0071 DAC 83-C0414 B C Z 5 3 2 S206 000 SI GUARD SERVICES 7 9 3 5 L 06 1 B J 2 D 83-C0450 B C Z 5 3 2 S206 000 Si GUARD SERVICES 7 9 7 5 L 06...C2470 J085 N62’ CONTRACTOR TOTAL 9 1,541 WALLER TODD & SADLI LA JUNTA COLORADO 040309 1520 06 1 C OCA65 0055 DAC 0-82-D4446 E C B 5 3 2 9140 000 A8A

  18. Near-Term Electric Vehicle Program. Phase II: Mid-Term Summary Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1978-08-01

    The Near Term Electric Vehicle (NTEV) Program is a constituent elements of the overall national Electric and Hybrid Vehicle Program that is being implemented by the Department of Energy in accordance with the requirements of the Electric and Hybrid Vehicle Research, Development, and Demonstration Act of 1976. Phase II of the NTEV Program is focused on the detailed design and development, of complete electric integrated test vehicles that incorporate current and near-term technology, and meet specified DOE objectives. The activities described in this Mid-Term Summary Report are being carried out by two contractor teams. The prime contractors for these contractormore » teams are the General Electric Company and the Garrett Corporation. This report is divided into two discrete parts. Part 1 describes the progress of the General Electric team and Part 2 describes the progress of the Garrett team.« less

  19. Orion GN and C Model Based Development: Experience and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Jackson, Mark C.; Henry, Joel R.

    2012-01-01

    The Orion Guidance Navigation and Control (GN&C) team is charged with developing GN&C algorithms for the Exploration Flight Test One (EFT-1) vehicle. The GN&C team is a joint team consisting primarily of Prime Contractor (Lockheed Martin) and NASA personnel and contractors. Early in the GN&C development cycle the team selected MATLAB/Simulink as the tool for developing GN&C algorithms and Mathworks autocode tools as the means for converting GN&C algorithms to flight software (FSW). This paper provides an assessment of the successes and problems encountered by the GN&C team from the perspective of Orion GN&C developers, integrators, FSW engineers and management. The Orion GN&C approach to graphical development, including simulation tools, standards development and autocode approaches are scored for the main activities that the team has completed through the development phases of the program.

  20. OSD’s Obligation and Expenditure Rate Goals: An Examination of the Factors Contributing to the Interference

    DTIC Science & Technology

    2013-07-01

    or other prerequisite events 44% 32% 59% 46% 11% F22 DCAA administrative actions 44% 33% 60% 45% 10% F23 Unplanned congressional adds to PB request...Management Agency (DCMA) administration actions (F36) and Defense Contract Audit Agency (DCAA) administra- tion ( F22 ). Three contract-related factors...of business/finance personnel F31 Programmatic conflicts between government and prime contractor .81 76% Administrative Actions: F36 DCMA & F22 DCAA

  1. Saturn Apollo Program

    NASA Image and Video Library

    1968-01-01

    This view depicts engineers conducting a system test on the Saturn V instrument unit (IU) at International Business Machines (IBM) in Huntsville, Alabama. IBM is a prime contractor for development and fabrication of the IU. The IU is vital to the proper flight of the vehicle. It contains navigation, guidance, control, and sequencing equipment for the launch vehicle. Three-feet tall, twenty-one feet in diameter, and weighing about 4,000 pounds, the IU is mounted atop the S-IVB (third) stage, between the S-IVB stage and the Apollo spacecraft.

  2. High Energy Astronomy Observatory (HEAO)

    NASA Image and Video Library

    1978-01-01

    This photograph was taken during the assembly of the High Energy Astronomy Observatory (HEAO)-2 at TRW, Inc., the prime contractor for the HEAOs. The HEAO-2, the first imaging and largest x-ray telescope built to date, was capable of producing actual photographs of x-ray objects. TRW, Inc. designed and developed the HEAO, under the project management of the Marshall Space Flight Center. The HEAO-2 was originally identified as HEAO-B but the designation was changed once the spacecraft achieved orbit.

  3. All Prime Contract Awards by State or Country, Place and Contractor. Part 13. (Akron, New York-Yorktown Heights, New York)

    DTIC Science & Technology

    1989-01-01

    34 . .~ . ........... 11 .... )........P: < <C < 1<ɜ<<<CE<c U (71) < E<<<<< <<<t<<<c c H J-4Cl)0 61 M -4"< I M-" In LL0I nI I I n.L. LL i ( u. LLna . Injn.. ) nI nInI ni

  4. Prime Contract Awards Alphabetically by Contractor, By State or Country, and Place, FY 84. Part 10. (Southern Ambulance Builders - Tucci & Sons, Inc).

    DTIC Science & Technology

    1984-01-01

    9- - 0 C) N’(Y C) 0 - 0) ) C~l00) 0 C) (MCDN Co) -’C’) N, () CmIf U)N c) U ) C) C) 1700D- -’ --- -U -N to) 00 WI . (Di 4- L) I .0 0atoc iD~la 0 0...Y00 E700 ITo ITO o ITOO ITO rTO IT I IO CL-I , - - - - - - .-- - - - - E . . . . . . .0>. M. 2y . * cmIf

  5. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for RDT&E (Research, Development, Test and Evaluation), Fiscal Year 1980.

    DTIC Science & Technology

    1980-01-01

    2624. * ROCKET CENTER "Vg4o6 IN SCIENCE APPLICATIONS- INC 46.97 N4UNTSVILLF ALAMaM 6,736 6 9 mEMO!’ coos 33,4676 4 VUDIA A0170NA Is* 0 LOS1 ANGILTS...CORP Of AMERICA S 1.622 4 NAHUA 4 1,236 * CAN@RROGf NASS 19622 251 SUER, MARINE SVVTEMS 2.130 - . 27 AUSTIN PESEARCk ASSOCIATES 5 los1 ?* eHARLOTTESVILL

  6. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for Research, Development, Test, and Evaluation

    DTIC Science & Technology

    1993-10-01

    development (exploratory, advanced, engineering, operational systems, or management and support services). Full definitions for each of these categories are ...displays the order of ranking for each, and shows how each has been categorized for reporting purposes. The categories are business firm (B...small businesses are further identified by an "S." The net value of awards to each of the firm’s reported locations is also provided. Tables 3, 4, and

  7. Orion EM-1 Booster Preps - Aft Skirt Preps/Painting

    NASA Image and Video Library

    2016-10-28

    A technician with Orbital ATK, prime contractor for the Space Launch System (SLS) Booster, preps a section of the right hand aft skirt for primer and paint in a support building at the Hangar AF facility at Cape Canaveral Air Force Station in Florida. The space shuttle-era aft skirt will be used on the right hand booster of NASA's SLS rocket for Exploration Mission 1 (EM-1). NASA is preparing for EM-1, deep space missions, and the Journey to Mars.

  8. James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Development Status

    NASA Technical Reports Server (NTRS)

    Feinberg, Lee D.

    2004-01-01

    The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) is a segmented, cryogenic telescope scheduled for launch in 2011. In September of 2002, NASA selected prime contractor Northrop Grumman Space Technology (NGST) to build the observatory including management of the OTE. NGST is teamed with subcontractors Ball Aerospace, Alliant Techsystems (ATK). and Kodak. The team has completed several significant design, technology, architecture definition, and manufacturing milestones in the past year that are summarized in this paper.

  9. n/a

    NASA Image and Video Library

    1977-09-09

    The first Space Shuttle External Tank, the Main Propulsion Test Article (MPTA), rolls off the assembly line September 9, 1977 at the Michoud Assembly Facility in New Orleans. The MPTA was then transported to the National Space Technology Laboratories in southern Mississippi where it was used in the first static firing of the three main engines. Marshall Space Flight Center had management responsibility for Space Shuttle propulsion elements, including the External Tank. Martin Marietta was the prime contractor who designed and assembled the tanks at Michoud.

  10. NASA 2012 Small Business Industry Awards (SBIA)

    NASA Image and Video Library

    2013-04-23

    NASA Administrator Charles Bolden, left, NASA Associate Administrator for Small Business Programs Glenn A. Delgado, second from left, and NASA Deputy Administrator Lori Garver, right, pose for a photograph with Patricia Rice, Manager, Supplier Diversity, Small Business Liaison Officer & Supplier Development, Pratt & Whitney Rocketdyne, Inc. and Jim Maser, President of Pratt & Whitney Rocketdyne, Inc. of East Hartford, Connecticut after the company was awarded the Large Business Prime Contractor of the Year at NASA Headquarters, Tuesday, April 23, 2013 in Washington. Photo Credit: (NASA/Bill Ingalls)

  11. Re-entry Flight Experiments Lessons Learned - The Atmospheric Reentry Demonstrator ARD

    DTIC Science & Technology

    2007-06-01

    civilian cooperative program was managed by Aerospatiale – Lanceurs Stratégiques et Spatiaux (now EADS – SPACE Transportation) as prime contractor. The...of an Al-alloy structure protected on the cone by Norcoat 62250 FI cork tiles and on the heat-shield by Aleastrasil silica-phenolic tiles (Figure 3... structure of the flight data points are meaningful even if the absolute Kp level is doubtful. Figure 19 shows CFD comparisons at Mach 10. The real gas

  12. All Prime Contract Awards by State or Country, Place, and Contractor, FY 87. Part 2. Agoura Hills, California-Lafayette, California.

    DTIC Science & Technology

    1987-01-01

    OWNGRADING SCHEDULE Approved for public release 4. PERFORMING ORGANIZATION REPORT NUMBER(S) 5. MONITORING ORGANIZATION REPORT NUMBER(S) DIOR/ST11-87...Pr- 2 6a. NAME OF PERFORMING ORGANIZATION 6b. OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATION WHS, Directorate for (if applicable) nformation...SPONSORING 1Sb. OFFICE SYMBOL 9. PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER ORGANIZATION (if applicable) Sc. ADDRESS (City, State, and ZIP Code) 10. SOURCE

  13. Saturn Apollo Program

    NASA Image and Video Library

    1967-11-01

    This image depicts a Boeing worker installing an F-1 engine on the Saturn V S-IC flight stage at the Michoud Assembly Facility (MAF). The Saturn IB and Saturn V first stages were manufactured at the MAF, located 24 kilometers (approximately 15 miles) east of downtown New Orleans, Louisiana. The prime contractors, Chrysler and Boeing, jointly occupied the MAF. The basic manufacturing building boasted 43 acres under one roof. By 1964, NASA added a separate engineering and office building, vertical assembly building, and test stage building.

  14. Surface contamination analysis technology team overview

    NASA Astrophysics Data System (ADS)

    Burns, H. Dewitt, Jr.

    1996-11-01

    The surface contamination analysis technology (SCAT) team was originated as a working roup of NASA civil service, Space Shuttle contractor, and university groups. Participating members of the SCAT Team have included personnel from NASA Marshall Space Flight Center's Materials and Processes Laboratory and Langley Research Center's Instrument Development Group; contractors-Thiokol Corporation's Inspection Technology Group, AC Engineering support contractor, Aerojet, SAIC, and Lockheed MArtin/Oak Ridge Y-12 support contractor and Shuttle External Tank prime contractor; and the University of Alabama in Huntsville's Center for Robotics and Automation. The goal of the SCAT team as originally defined was to develop and integrate a multi-purpose inspection head for robotic application to in-process inspection of contamination sensitive surfaces. One area of interest was replacement of ozone depleting solvents currently used for surface cleanliness verification. The team approach brought together the appropriate personnel to determine what surface inspection techniques were applicable to multi-program surface cleanliness inspection. Major substrates of interest were chosen to simulate space shuttle critical bonding surface or surfaces sensitive to contamination such as fuel system component surfaces. Inspection techniques evaluated include optically stimulated electron emission or photoelectron emission; Fourier transform infrared spectroscopy; near infrared fiber optic spectroscopy; and, ultraviolet fluorescence. Current plans are to demonstrate an integrated system in MSFC's Productivity Enhancement Complex within five years from initiation of this effort in 1992. Instrumentation specifications and designs developed under this effort include a portable diffuse reflectance FTIR system built by Surface Optics Corporation and a third generation optically stimulated electron emission system built by LaRC. This paper will discuss the evaluation of the various techniques on a number of substrate materials contaminated with hydrocarbons, silicones, and fluorocarbons. Discussion will also include standards development for instrument calibration and testing.

  15. Independent Orbiter Assessment (IOA): FMEA/CIL assessment

    NASA Technical Reports Server (NTRS)

    Hinsdale, L. W.; Swain, L. J.; Barnes, J. E.

    1988-01-01

    The McDonnell Douglas Astronautics Company (MDAC) was selected to perform an Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL). Direction was given by the Orbiter and GFE Projects Office to perform the hardware analysis and assessment using the instructions and ground rules defined in NSTS 22206. The IOA analysis featured a top-down approach to determine hardware failure modes, criticality, and potential critical items. To preserve independence, the analysis was accomplished without reliance upon the results contained within the NASA and Prime Contractor FMEA/CIL documentation. The assessment process compared the independently derived failure modes and criticality assignments to the proposed NASA post 51-L FMEA/CIL documentation. When possible, assessment issues were discussed and resolved with the NASA subsystem managers. Unresolved issues were elevated to the Orbiter and GFE Projects Office manager, Configuration Control Board (CCB), or Program Requirements Control Board (PRCB) for further resolution. The most important Orbiter assessment finding was the previously unknown stuck autopilot push-button criticality 1/1 failure mode. The worst case effect could cause loss of crew/vehicle when the microwave landing system is not active. It is concluded that NASA and Prime Contractor Post 51-L FMEA/CIL documentation assessed by IOA is believed to be technically accurate and complete. All CIL issues were resolved. No FMEA issues remain that have safety implications. Consideration should be given, however, to upgrading NSTS 22206 with definitive ground rules which more clearly spell out the limits of redundancy.

  16. Method of fission heat flux determination from experimental data

    DOEpatents

    Paxton, Frank A.

    1999-01-01

    A method is provided for determining the fission heat flux of a prime specimen inserted into a specimen of a test reactor. A pair of thermocouple test specimens are positioned at the same level in the holder and a determination is made of various experimental data including the temperature of the thermocouple test specimens, the temperature of bulk water channels located in the test holder, the gamma scan count ratios for the thermocouple test specimens and the prime specimen, and the thicknesses of the outer clads, the fuel fillers, and the backclad of the thermocouple test specimen. Using this experimental data, the absolute value of the fission heat flux for the thermocouple test specimens and prime specimen can be calculated.

  17. Space Commercialization Trends and Consequences for the Workforce

    NASA Astrophysics Data System (ADS)

    Peeters, W.

    2002-01-01

    The major trend we are currently witnessing in space activities is an increasing level of commercialization. This trend is emphasized by: consolidation, mergers and forming strategic alliances. In USA, from the 20 major space companies in the 80's only 3 `prime' ones were left by 1997. A similar effect took place in Europe in the 90's, where at present only primarily 2 major space conglomerates are operating at prime contractor level. Such strategic alliances in the first place result in the creation of end-to-end capabilities, with larger internal R&D and broader access to technologies. Due to the bigger financial volume of such conglomerates there is also better access to new capital and sharing of risks. In a second step, we can at present observe the creation of transatlantic alliances to enter the worldwide market. These trends have a considerable effect on the workforce requirements in industry:

  18. NASA on a Strong Roll in Preparing Space Launch System Flight Engines

    NASA Image and Video Library

    2017-08-09

    NASA is on a roll when it comes to testing engines for its new Space Launch System (SLS) rocket that will send astronauts to deep-space destinations, including Mars. Just two weeks after the third test of a new RS-25 engine flight controller, the space agency recorded its fourth full-duration controller test Aug. 9 at Stennis Space Center near Bay St. Louis, Mississippi. Engineers conducted a 500-second test of the RS-25 engine controller on the A-1 Test Stand at Stennis. The test involved installing the controller on an RS-25 development engine and firing it in the same manner, and for the same length of time, as needed during an actual SLS launch. The test marked another milestone toward launch of the first integrated flight of the SLS rocket and Orion crew vehicle. Exploration Mission-1 will be an uncrewed mission into lunar orbit, designed to provide a final check-out test of rocket and Orion capabilities before astronauts are returned to deep space. The SLS rocket will be powered at launch by four RS-25 engines, providing a combined 2 million pounds of thrust, and with a pair of solid rocket boosters, providing more than 8 million pounds of total thrust. The RS-25 engines for the initial SLS flights are former space shuttle main engines that are now being used to launch the larger and heavier SLS rocket and with the new controller. The controller is a critical component that operates as the engine “brain” that communicates with SLS flight computers to receive operation performance commands and to provide diagnostic data on engine health and status. Engineers conducted early prototype tests at Stennis to collect data for development of the new controller by NASA, RS-25 prime contractor Aerojet Rocketdyne and subcontractor Honeywell. Testing of actual flight controllers began at Stennis in March. NASA is testing all controllers and engines designated for the EM-1 flight at Stennis. It also will test the SLS core stage for the flight at Stennis, which will involve installing the stage on the B-2 Test Stand and firing its four RS-25 engines simultaneously, as during an actual launch. RS-25 tests at Stennis are conducted by a team of NASA, Aerojet Rocketdyne and Syncom Space Services engineers and operators. Aerojet Rocketdyne is the RS-25 prime contractor. Syncom Space Services is the prime contractor for Stennis facilities and operations.

  19. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deborah L. Layton; Kimberly Frerichs

    2011-12-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less

  20. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deborah L. Layton; Kimberly Frerichs

    2010-07-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less

  1. All Prime Contract Awards by State or Country, Place, and Contractor, FY83, Part 1 (Argentina-Goodyear, Arizona).

    DTIC Science & Technology

    1983-01-01

    C Z 5 2 2 5110 000 69 HAND TOOLS EDGED NONPOWERED 7 9 3 5 L 06 1 B 4 1 0 100 WAESCHEREI KRAUSE GERMANY 088616 0000 GY I L OJA37 2913 DAJA37-82-00210 B...0 27 WOLFGANG PRAYON GERMANY 090010 0000 GY I D OJA37 0369 DAJA37-82-DO261 B C 2 5 3 2 V212 000 S MOTOR PASSENGER SERVICE 7 9 4 5 L 06 1 B J 1 J 34

  2. Dollar Summary of Prime Contract Awards with Principal Place of Performance Outside the U.S. by Country and Contractor, FY83.

    DTIC Science & Technology

    1983-01-01

    GERMANY 55 55 KOHLEN GRUB GERMANY 9,706 9,706 KOLLER WOLFGANG GERMANY 28 28 KOLLSMANN 0MBN SYSTEM TECHN IK GERMANY 37 37 KONTRO#4 ELEKTRONI C GMBH... KRAUSE GERMANY 56 56 WAGNER GLAS UND GEBAEUDEREINIGUNG GERMANY 374 374 WAGNER GMSM GERMANY 138 136 WAGNER H GERMANY 570 570 WAGNER H a S GARTEN... WOLFGANG PRAYON GERMANY 34 34 WOLLERSHE I M ALFRED GERMANY 47 47 WORMSER AUIOBUSSETRI ED GERMANY 178 178 WUERSCHINGER HANS GERMANY 73 73 WUEST BAU

  3. Saturn Apollo Program

    NASA Image and Video Library

    1967-10-01

    This is a view of the Saturn V instrument unit (IU) being manufactured in the east high bay at International Business Machines (IBM) in Huntsville, Alabama. IBM is a prime contractor for development and fabrication of the IU. The IU is vital to the proper flight of the vehicle. It contains navigation, guidance, control, and sequencing equipment for the launch vehicle. Three feet tall, twenty-one feet in diameter, and weighing about 4,000 pounds, the IU is mounted atop the S-IVB (third) stage, between the S-IVB stage and the Apollo spacecraft.

  4. Leadership Development Program Final Project

    NASA Technical Reports Server (NTRS)

    Parrish, Teresa C.

    2016-01-01

    TOSC is NASA's prime contractor tasked to successfully assemble, test, and launch the EM1 spacecraft. TOSC success is highly dependent on design products from the other NASA Programs manufacturing and delivering the flight hardware; Space Launch System(SLS) and Multi-Purpose Crew Vehicle(MPCV). Design products directly feed into TOSC's: Procedures, Personnel training, Hardware assembly, Software development, Integrated vehicle test and checkout, Launch. TOSC senior management recognized a significant schedule risk as these products are still being developed by the other two (2) programs; SVE and ACE positions were created.

  5. JUICE: A European mission to explore the emergence of habitable worlds around gas giants

    NASA Astrophysics Data System (ADS)

    Witasse, O.

    2017-09-01

    JUICE - JUpiter ICy moons Explorer - is the first large mission in the ESA Cosmic Vision 2015-2025 programme. The mission was selected in May 2012 and adopted in November 2014. The implementation phase started in July 2015, following the selection of the prime industrial contractor, Airbus Defense and Space (Toulouse, France). Due to launch in June 2022 and arrival at Jupiter in October 2029, it will spend at least three ½ years making detailed observations of Jupiter and three of its largest moons, Ganymede, Callisto and Europa.

  6. Simulation test beds for the space station electrical power system

    NASA Technical Reports Server (NTRS)

    Sadler, Gerald G.

    1988-01-01

    NASA Lewis Research Center and its prime contractor are responsible for developing the electrical power system on the space station. The power system will be controlled by a network of distributed processors. Control software will be verified, validated, and tested in hardware and software test beds. Current plans for the software test bed involve using real time and nonreal time simulations of the power system. This paper will discuss the general simulation objectives and configurations, control architecture, interfaces between simulator and controls, types of tests, and facility configurations.

  7. Prime Contract Awards Alphabetically by Contractor, By State or Country, and Place, FY 84. Part 11. (Tucker & Associates Contg - Zytron Corporation).

    DTIC Science & Technology

    1984-01-01

    5 00 Wi tO 0 * *m~M 05- a * 0 0 0 D0N M 00 0 0 0 0 0 0 0 0 00 0 0 i0- 0 , 00 0 0 0 0 0 0 0 0 00 0 0 - ~ i -. 0 0 0 0 0 0Y 0 CD...ON WN WD CLe) 0 Wi - - - - )* C D- q n N7 n - 5 n r0 N) -- .- . - -- "T Iq "r

  8. Commercial application of thermal protection system technology

    NASA Technical Reports Server (NTRS)

    Dyer, Gordon L.

    1991-01-01

    The thermal protection system process technology is examined which is used in the manufacture of the External Tank for the Space Shuttle system and how that technology is applied by private business to create new products, new markets, and new American jobs. The term 'technology transfer' means different things to different people and has become one of the buzz words of the 1980s and 1990s. Herein, technology transfer is defined as a means of transferring technology developed by NASA's prime contractors to public and private sector industries.

  9. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY83, Part 1 (Adamsville, Alabama - Ferndale, Michigan).

    DTIC Science & Technology

    1983-01-01

    ALABAMA 281 281 WESTON ROY F ANNISTON ALABAMA 585- 585- WESTON ROY F & HARRINGTON ETAL JV ANNISTON ALABAMA 52 52 WILLIAMS CONSTRUCTION CO INC ANNISTON...ALABAMA 33 33 ERNEST CONSTRUCTION CO BAY MINETTE ALABAMA 200 200 SYNTEX DENTAL CO BAY MINETTE ALABAMA 2,601 169 2,412 2,925 91 189 2,445 200 QUALITY...ALABAMA 1,235 1,235 WILLIAMS BURT CONST & REMODELNG C FORT RUCKER ALABAMA 160 160 WOODHAM & SHARPE FORT RUCKER ALABAMA 44 44 XEROX CORP FORT RUCKER

  10. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for RDT&E, Fiscal Year 1992

    DTIC Science & Technology

    1992-01-01

    201 F CANADIAN COMMERCIAL CORPORATI 268 B AMTEC CORPORATION 67 N CARNEGIE MELLON UNIVERSITY 118 B ANALYSIS & TECHNOLOGY INC 192 B CAS INC 86 N...LAB INC 342 F GENERAL ELECTRIC CO PLC THE 356 B DU PONT E I DE NEMOURS & CO 3 B GENERAL ELECTRIC COMPANY 325 N DUKE UNIVERSITY 295 N GENERAL HOSPITAL...F SOREQ NUCLEAR RESEARCH CENTER 260 F PORTON INTERNATIONAL INC 55 N SOUTH CAROLINA RESCH AUTHORITY 82 B PRC INC 206 N SOUrTHEASTN CTR ELECTR ENG ED

  11. Study to forecast and determine characteristics of world satellite communications market

    NASA Technical Reports Server (NTRS)

    Filep, R. T.; Schnapf, A.; Fordyce, S. W.

    1983-01-01

    The world commercial communications satellite market during the spring and summer of 1983 was examined and characteristics and forecasts of the market extending to the year 2000 were developed. Past, present and planned satellites were documented in relation to frequencies, procurement and launch dates, costs, transponders, and prime contractor. Characteristics of the market are outlined for the periods 1965 - 1985, 1986 - 1989, and 1990 - 2000. Market share forecasts, discussions of potential competitors in various world markets, and profiles of major communication satellite manufacturing and user countries are documented.

  12. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY83, Part 2 (Flint, Michigan - Wheatland, Wyoming).

    DTIC Science & Technology

    1983-01-01

    MARK AERIAL SURVEYS INC MINNEAPOLIS MINNESOTA 538 538 HYDRAULIC SPECIALTY CO MINNEAPOLIS MINNESOTA 36 3r INTRAN CORP MINNEAPOLIS MINNESOTA 171 171 J C...OITEv sOWES INC VICKSBURG mISS 25 25 PONTCHARTRAIN MATERIALS CORP VICKSURG mISS 543 543 OUCKETT MAH4INERY C VICKSBURG MISS 217 217 IACAL DECCA SURVEY ...ASSOCIATES FORT DIX NEW JERSEY 42 42 EC INC FORT DIX NEW JERSEY 28 28 EY SHAMPOOING CO FORT DIX NEW JERSEY 475 475 JERSEY BELL TELEPHONE CO FORT DIX

  13. Dollar Summary of Prime Contract Awards by State, County, Contractor, and Place, FY83, Part 2 (Oceana, Michigan - Weston, Wyoming).

    DTIC Science & Technology

    1983-01-01

    CATERING CO MINNEAPOLIS 35 35 MINNE HENNEPI HURD MARK AERIAL SURVEYS INC MINNEAPOLIS 538 538 MINNE HENNEPI HYDRAULIC SPECIALTY CO MINNEAPOLIS 36 36...539 539 PITNEY BOWES INC VICKSBURG 25 25 PONTCHARTRAIN MATERIALS CORP VICKSBURG 543 543 PUCKETT MACHINERY CO VICKSBURG 217 217 RACAL DECCA SURVEY INC...138 138 VIEC INC FORT DIX 28 28 rLEY SHAMPOOING CO FORT DIX 475 475 rOROLA INC MCGUIRE AFB 115 29 86 L TRANSFORMERS BORDENTOWN 368 368 9 JERSEY BELL

  14. ISS Logistics Hardware Disposition and Metrics Validation

    NASA Technical Reports Server (NTRS)

    Rogers, Toneka R.

    2010-01-01

    I was assigned to the Logistics Division of the International Space Station (ISS)/Spacecraft Processing Directorate. The Division consists of eight NASA engineers and specialists that oversee the logistics portion of the Checkout, Assembly, and Payload Processing Services (CAPPS) contract. Boeing, their sub-contractors and the Boeing Prime contract out of Johnson Space Center, provide the Integrated Logistics Support for the ISS activities at Kennedy Space Center. Essentially they ensure that spares are available to support flight hardware processing and the associated ground support equipment (GSE). Boeing maintains a Depot for electrical, mechanical and structural modifications and/or repair capability as required. My assigned task was to learn project management techniques utilized by NASA and its' contractors to provide an efficient and effective logistics support infrastructure to the ISS program. Within the Space Station Processing Facility (SSPF) I was exposed to Logistics support components, such as, the NASA Spacecraft Services Depot (NSSD) capabilities, Mission Processing tools, techniques and Warehouse support issues, required for integrating Space Station elements at the Kennedy Space Center. I also supported the identification of near-term ISS Hardware and Ground Support Equipment (GSE) candidates for excessing/disposition prior to October 2010; and the validation of several Logistics Metrics used by the contractor to measure logistics support effectiveness.

  15. Aerospace Safety Advisory Panel

    NASA Technical Reports Server (NTRS)

    1989-01-01

    This report provides findings, conclusions and recommendations regarding the National Space Transportation System (NSTS), the Space Station Freedom Program (SSFP), aeronautical projects and other areas of NASA activities. The main focus of the Aerospace Safety Advisory Panel (ASAP) during 1988 has been monitoring and advising NASA and its contractors on the Space Transportation System (STS) recovery program. NASA efforts have restored the flight program with a much better management organization, safety and quality assurance organizations, and management communication system. The NASA National Space Transportation System (NSTS) organization in conjunction with its prime contractors should be encouraged to continue development and incorporation of appropriate design and operational improvements which will further reduce risk. The data from each Shuttle flight should be used to determine if affordable design and/or operational improvements could further increase safety. The review of Critical Items (CILs), Failure Mode Effects and Analyses (FMEAs) and Hazard Analyses (HAs) after the Challenger accident has given the program a massive data base with which to establish a formal program with prioritized changes.

  16. Review of the Constellation Level II Safety, Reliability, and Quality Assurance (SR&QA) Requirements Documents during Participation in the Constellation Level II SR&QA Forum

    NASA Technical Reports Server (NTRS)

    Cameron, Kenneth D.; Gentz, Steven J.; Beil, Robert J.; Minute, Stephen A.; Currie, Nancy J.; Scott, Steven S.; Thomas, Walter B., III; Smiles, Michael D.; Schafer, Charles F.; Null, Cynthia H.; hide

    2009-01-01

    At the request of the Exploration Systems Mission Directorate (ESMD) and the Constellation Program (CxP) Safety, Reliability; and Quality Assurance (SR&QA) Requirements Director, the NASA Engineering and Safety Center (NESC) participated in the Cx SR&QA Requirements forum. The Requirements Forum was held June 24-26; 2008, at GRC's Plum Brook Facility. The forums purpose was to gather all stakeholders into a focused meeting to help complete the process of refining the CxP to refine its Level II SR&QA requirements or defining project-specific requirements tailoring. Element prime contractors had raised specific questions about the wording and intent of many requirements in areas they felt were driving costs without adding commensurate value. NESC was asked to provide an independent and thorough review of requirements that contractors believed were driving Program costs, by active participation in the forum. This document contains information from the forum.

  17. Current Abstracts Nuclear Reactors and Technology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bales, J.D.; Hicks, S.C.

    1993-01-01

    This publication Nuclear Reactors and Technology (NRT) announces on a monthly basis the current worldwide information available from the open literature on nuclear reactors and technology, including all aspects of power reactors, components and accessories, fuel elements, control systems, and materials. This publication contains the abstracts of DOE reports, journal articles, conference papers, patents, theses, and monographs added to the Energy Science and Technology Database during the past month. Also included are US information obtained through acquisition programs or interagency agreements and international information obtained through acquisition programs or interagency agreements and international information obtained through the International Energy Agency`smore » Energy Technology Data Exchange or government-to-government agreements. The digests in NRT and other citations to information on nuclear reactors back to 1948 are available for online searching and retrieval on the Energy Science and Technology Database and Nuclear Science Abstracts (NSA) database. Current information, added daily to the Energy Science and Technology Database, is available to DOE and its contractors through the DOE Integrated Technical Information System. Customized profiles can be developed to provide current information to meet each user`s needs.« less

  18. Nuclear Reactors and Technology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cason, D.L.; Hicks, S.C.

    1992-01-01

    This publication Nuclear Reactors and Technology (NRT) announces on a monthly basis the current worldwide information available from the open literature on nuclear reactors and technology, including all aspects of power reactors, components and accessories, fuel elements, control systems, and materials. This publication contains the abstracts of DOE reports, journal articles, conference papers, patents, theses, and monographs added to the Energy Science and Technology Database during the past month. Also included are US information obtained through acquisition programs or interagency agreements and international information obtained through the International Energy Agency`s Energy Technology Data Exchange or government-to-government agreements. The digests inmore » NRT and other citations to information on nuclear reactors back to 1948 are available for online searching and retrieval on the Energy Science and Technology Database and Nuclear Science Abstracts (NSA) database. Current information, added daily to the Energy Science and Technology Database, is available to DOE and its contractors through the DOE Integrated Technical Information System. Customized profiles can be developed to provide current information to meet each user`s needs.« less

  19. Gamma prime hardened nickel-iron based superalloy

    DOEpatents

    Korenko, Michael K.

    1978-01-01

    A low swelling, gamma prime hardened nickel-iron base superalloy useful for fast reactor duct and cladding applications is described having from about 7.0 to about 10.5 weight percent (wt%) chromium, from about 24 to about 35 wt% nickel, from about 1.7 to about 2.5 wt% titanium, from about 0.3 to about 1.0 wt% aluminum, from about 2.0 to about 3.3 wt% molybdenum, from about 0.05 to about 1.0 wt% silicon, from about 0.03 to about 0.06 wt% carbon, a maximum of about 2 wt% manganese, and the balance iron.

  20. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, FY 88. Part 15. (Ogilvie Electronics-Prime Engineering Co., Inc.)

    DTIC Science & Technology

    1988-01-01

    1 MON 𔃺 cr U. WU NN U& 0 > I- I’X O 𔃺 co w A - 00 C . CL 0 0 I= 0 II ON I 0f C14 w(N 0 ~ 0 ~ N 0D zN I-- 2 -C Z ICON " 00 1-1 I4ii~iiiN 00 00 0 CO...f, r- 000000 00 00 00 00 00 0AC- 00 00 00 < ICOC’ 1 000 00 000000 000000 00 00 00 00 00 L 00 0000 00 I COON I1"-> 1’COON 1 F- 0 .I 0. LA 4C ICON 4...00 0000c00 00 0000 000000 0000 00 0000 000000 00 00 39W0 ’oq 10 40WON00 9- ICON " I .4 CIWON I90 t MON 1 1- 0 0 0 0 F.-IWO 9oi I> Z - 2 (a(00Wt0)W oLl

  1. The NASA welding assessment program

    NASA Technical Reports Server (NTRS)

    Scott-Monck, J.; Bozek, J.

    1984-01-01

    The potential cost and performance advantages of welding was understood but ignored by solar panel manufacturers in the U.S. Although NASA, DOD and COMSAT have supported welding development efforts, soldering remains the only U.S. space qualified method for interconnecting solar cells. The reason is that no U.S. satellite prime contractor found it necessary, due to mission requirements, to abandon the space proven soldering process. It appears that the proposed NASA space station program will provide an array requirement, a 10 year operation in a low Earth orbital environment, that mandates welding. The status of welding technology in the U.S. is assessed.

  2. Idaho National Laboratory Emergency Readiness Assurance Plan - Fiscal Year 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farmer, Carl J.

    Department of Energy Order 151.1C, Comprehensive Emergency Management System requires that each Department of Energy field element documents readiness assurance activities, addressing emergency response planning and preparedness. Battelle Energy Alliance, LLC, as prime contractor at the Idaho National Laboratory (INL), has compiled this Emergency Readiness Assurance Plan to provide this assurance to the Department of Energy Idaho Operations Office. Stated emergency capabilities at the INL are sufficient to implement emergency plans. Summary tables augment descriptive paragraphs to provide easy access to data. Additionally, the plan furnishes budgeting, personnel, and planning forecasts for the next 5 years.

  3. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY84, Part 4, (Allenville, Missouri-Wyoming, Pennsylvania).

    DTIC Science & Technology

    1984-01-01

    HEATHER DRUG CO INC 182 182 HEATHER DRUG CO INC 50 50 HEATHER DRUG CO INC 81 81 HUSSMANN CORPORATION 76 76 INFORMATION SPECTRUM INC 519 319 74 INFORTRON...PISCATAWAY BEECHAM INC 151 151 BLOCK DRUG COMPANY INC 29 29 DIGITAL EQUIPMENT CORPORATION 692 692 HEWLETT PACKARD CO 206 206 INGERSOLL-RAND COMPANY INC 26...FOOD & DRUG RESEARCH LABS 131 131 VALLEY FORGE FLAG CO INC 1,504 1,504 TOTAL - VERONA 2,126 131 144 35 1,816 VINCENTOWN K I M CONSTRUCTION COMPANY INC

  4. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY84, Part 2 (Air Force Academy, Colorado-Zion, Illinois).

    DTIC Science & Technology

    1984-01-01

    THEODORE AND COMPANY 32 32 HOLDING HAROLD R 71 71 INTERACTIVE SYSTEMS CORP 297 297 J & R CONSTRUCTION CO INC 94 94 KETCHUM KONKEL & AUSTIN 10 150 MC...TELECOM INC 510 510 DATA SYSTEMS MARKETING 26 26 DUGGAN PETROLEUM CO INC 3,249 3,249 HONEYWELL INC 3,581 267 2,400 830 INTERACTIVE SYSTEMS CORP 424 424...FORCE DLA OCE ODA SANDERSVILLE PRENTISS DRUG & CHEMICAL CO 89 89 TOTAL - SANDERSVILLE 744 744 SAVANNAH A C S CONSTRUCTION CO MISS 550 550 A J C INTL

  5. Orion EM-1 Booster Preps - Aft Skirt Preps/Painting

    NASA Image and Video Library

    2016-10-28

    A paint technician with Orbital ATK, prime contractor for the Space Launch System (SLS) Booster, uses an air gun to apply paint to the right hand aft skirt for NASA’s SLS rocket inside a support building at the Hangar AF facility at Cape Canaveral Air Force Station. The space shuttle-era aft skirt, was inspected and resurfaced to prepare it for primer and paint. The aft skirt will be used on the right hand booster of the SLS rocket for Exploration Mission 1 (EM-1). NASA is preparing for EM-1, deep-space missions, and the journey to Mars.

  6. X-ray satellite (ROSAT)

    NASA Technical Reports Server (NTRS)

    1986-01-01

    With regards to technical performance, the project is running according to plan. An increase in total cost outlay was required. The new Dornier Systems schedule projects ROSAT launch readiness for April 27, 1988. However, as a result of the Challenger accident, no binding launch date has been received from NASA. The thirteenth status review was conducted at the prime contractor in March, 1986. Assembly of the FM mirror system has been interrupted due to irregularities in the gold damping; in addition, mission operation and simulator development are effected by understaffing. Postponements have been announced in the data transmission and components acquisition subsystems.

  7. Microgravity

    NASA Image and Video Library

    2000-01-30

    Engineers from NASA's Glenn Research Center demonstrate the access to one of the experiment racks planned for the U.S. Destiny laboratory module on the International Space Station (ISS). This mockup has the full diameter, full corridor width, and half the length of the module. The mockup includes engineering mockups of the Fluids and Combustion Facility being developed by NASA's Glenn Research Center. (The full module will be six racks long; the mockup is three racks long). Listening at center is former astronaut Brewster Shaw (center), now a program official with the Boeing Co., the ISS prime contractor. Photo credit: NASA/Marshall Space Flight Center (MSFC)

  8. All Prime Contract Awards by State or Country, Place, and Contractor. Part 10 (Croom, Maryland-Mendon, Mass)

    DTIC Science & Technology

    1990-01-01

    A -IfCJ A ACI 11 LO n (O ? )-t ((D In ((D D-0- n InW ItJ0- W MJWW W .1 ..I<(-4 it I I 1-UCI 41) 0 (04 >1 :: o c" C c14 A CA ACCA C (,j AOCANAN" C CA C...7 )0470 C )) )4))M )( DD000 )0 )0 M0) 0) M0( F8 -00 0 0 8-481I8IM(0.4 it " 0) () r-000000000000000000000000000000000 00 0 ) ) -w I(0-4 it 1A

  9. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY84, Part 5, (Ashton, Rhode Island-Sinclair, Wyoming).

    DTIC Science & Technology

    1984-01-01

    ASSOCIATES INC 37 37 WARD 79 LTD DEL 242 242 WEEKS CONSTRUCTION CO 66 66 WESTINGHOUSE ELECTRIC CORP 29 29 WILLIAMS SERVICES INC 629 629 XEROX CORPORATION...UNIVERSITY OF SOUTH CAROLINA 489 242 190 57 WILLIAMS SERVICES INC 56 56 XEROX CORPORATION 202 163 39 TOTAL - COLUMBIA 28,454 17,409 791 439 2,499 7,316...CO OF LAKE C 165 165 FENNELL CNTR CO CHRLSTN 148 148 FLAD & ASSOCIATES OF FLORIDA 26 26 FREEMAN WILLIAM F INC 48 48 GENERATION III INC 51 51

  10. Apollo Soyuz test project. USA-USSR, fact sheet

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The Apollo Soyuz Test Project (ASTP) is discussed. The United States and the Soviet Union have agreed to develop compatible rendezvous and docking systems which will provide a basis for docking and rescue on future spacecraft of both nations. The ASTP mission will include testing the rendezvous system in orbit, verifying techniques for transfer of astronauts and cosmonauts, and conducting experiments while docked and undocked. Diagrams of the spacecraft and systems involved in the tests are presented. The prime contractors for the equipment are identified. Biographical data on the astronauts participating in the program are provided.

  11. Starting A New Project: Thoughts from NGST

    NASA Technical Reports Server (NTRS)

    Mather, John C.; Oegerle, William (Technical Monitor)

    2002-01-01

    Some key elements of the history of NGST (Next Generation Space Telescope) that made a new mission possible will be reviewed, from the very beginnings to the present moment in the middle of selecting a prime contractor. A few forecasts of the possible discoveries will be made that may precede the launch of a new UV telescope, in hopes of inspiring sufficiently ambitious goals that they will still be exciting in 15 or 20 years. We will also discuss the enabling technology for NGST and my thoughts on enabling technology for a UV telescope Flint: they are not all about detectors and Mirrors!

  12. All Prime Contract Awards by State or Country, Place, and Contractor. Part 3 (Lomita, California-Sand Hill, California).

    DTIC Science & Technology

    1990-01-01

    I 000 MI ~CY) CCCC1)c ) C11 IP )ClOCOCO MC = 1) CO) ~ CYO ~ C’) ~CO =1 ) v C1 = (1 11 1(00 COO f rH -r -I ,r -I * 1 ’ -- - r- 4- r- 4- r- 4- 4- 4- 4...4 < M Cf) 11 0 0-40 0 1-1-40 -400 >-400COO4000 Uo -40 r 11 103M 11 0 t-400 zo 0)0 >-MOO -Moooooooo a 0)o < 11 1 MCI) 11 (71 1-- a* 0) _j 00) >. CIO

  13. One Door to the Corps: The U.S. Army Engineering and Support Center, Huntsville Historical Update, 1998-2007

    DTIC Science & Technology

    2009-01-01

    with Transpiring Wall Reactor; and Gas Phase Chemical Reduction systems . After much study , ACWA selected three technologies for additional study ...detection systems , and hardware development. Importantly, these advancements allowed for a more effective and cost-efficient remediation process... grounds at the ASPs, the munitions contractors considered a variety of factors, including proximity to the local civilian population and potential

  14. Manned space flight nuclear system safety. Volume 3: Reactor system preliminary nuclear safety analysis. Part 1: Reference Design Document (RDD)

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The Reference Design Document, of the Preliminary Safety Analysis Report (PSAR) - Reactor System provides the basic design and operations data used in the nuclear safety analysis of the Rector Power Module as applied to a Space Base program. A description of the power module systems, facilities, launch vehicle and mission operations, as defined in NASA Phase A Space Base studies is included. Each of two Zirconium Hydride Reactor Brayton power modules provides 50 kWe for the nominal 50 man Space Base. The INT-21 is the prime launch vehicle. Resupply to the 500 km orbit over the ten year mission is provided by the Space Shuttle. At the end of the power module lifetime (nominally five years), a reactor disposal system is deployed for boost into a 990 km high altitude (long decay time) earth orbit.

  15. NUT SCREW MECHANISMS

    DOEpatents

    Glass, J.A.F.

    1958-07-01

    A reactor control mechanism is described wherein the control is achieved by the partial or total withdrawal of the fissile material which is in the form of a fuel rod. The fuel rod is designed to be raised and lowered from the reactor core area by means of two concentric ball nut and screw assemblies that may telescope one within the other. These screw mechanisms are connected through a magnetic clutch to a speed reduction gear and an accurately controllable prime motive source. With the clutch energized, the fuel rod may be moved into the reactor core area, and fine adjustments may be made through the reduction gearing. However, in the event of a power failure or an emergency signal, the magnetic clutch will become deenergized, and the fuel rod will drop out of the core area by the force of gravity, thus shutting down the operation of the reactor.

  16. Precipitation hardenable iron-nickel-chromium alloy having good swelling resistance and low neutron absorbence

    DOEpatents

    Korenko, Michael K.; Merrick, Howard F.; Gibson, Robert C.

    1980-01-01

    An iron-nickel-chromium age-hardenable alloy suitable for use in fast breeder reactor ducts and cladding which utilizes the gamma-double prime strengthening phase and characterized in having a morphology of the gamma-double prime phase enveloping the gamma-prime phase and delta phase distributed at or near the grain boundaries. The alloy consists essentially of about 40-50% nickel, 7.5-14% chromium, 1.5-4% niobium, 0.25-0.75% silicon, 1-3% titanium, 0.1-0.5% aluminum, 0.02-0.1% carbon, 0.002-0.015% boron, and the balance iron. Up to 2% manganese and up to 0.01% magnesium may be added to inhibit trace element effects; up to 0.1% zirconium may be added to increase radiation swelling resistance; and up to 3% molybdenum may be added to increase strength.

  17. TRL Assessment of Solar Sail Technology Development Following the 20-Meter System Ground Demonstrator Hardware Testing

    NASA Technical Reports Server (NTRS)

    Young, Roy M.; Montgomery, Edward E.; Montgomery, Sandy; Adams, Charles L.

    2007-01-01

    The NASA In-Space Propulsion Technology (ISPT) Projects Office has been sponsoring 2 separate, independent system design and development hardware demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L'Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter ground demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators. Descriptions of the system designs for both the ATK and L'Garde systems will be presented. Changes, additions and evolution of the system designs will be highlighted. A description of the modeling and analyses activities performed by both teams, as well as testing conducted to raise the TRL of solar sail technology will be presented. A summary of the results of model correlation activities will be presented. Finally, technology gaps identified during the assessment and gap closure plans will be presented, along with "lessons learned", subsequent planning activities and validation flight opportunities for solar sail propulsion technology.

  18. The BepiColombo Spacecraft: The Mercury Transfer Module Structure Qualification Test Campaign Description

    NASA Astrophysics Data System (ADS)

    Martin Zurdo, M. J.

    2012-07-01

    The BepiColombo is a space mission to Mercury (ESA in cooperation with Japan Aerospace Exploration Agency). The spacecraft consist of three different structures: two orbiters responsible for the scientific mission (MPO and MMO) and one service module, Mercury Transfer Module (MTM), which provides propulsion and services during the journey to Mercury. Taking into account only the MTM structure, the companies involved are ASTRIUM GERMANY acting as the prime contractor and ASTRIUM UK acting as the co- prime contractor company. EADS CASA Espacio (ECE) in Spain is the company responsible for the final design, manufacturing and qualification of the MTM structure. The test campaign specimen is the MTM core structure, which corresponds to the central cone with the structure floors, shear panels and tank support structure. This test campaign qualifies the primary load path and its primary interfaces; the rest of the MTM structure is qualified by system level vibration test. In order to qualify the MTM structure, three different kinds of qualification tests have been performed: stiffness test, global strength test and local tests in different specific areas. The most relevant test during the campaign is the global strength test case, in which several external loads are introduced (different interfaces) simulating the load introduction for a selected critical flight case. There are two important items in the qualification test campaign: 1. The instrumentation of the structure, with two main functions: to control the specimen under test loads, and to demonstrate the qualification of the structure. 2. The set-up structure, designed by ECE to allow the correct load introduction on each testing case during the whole test campaign. This paper describes the MTM structure test campaign from the definition of the loads applied in each test to the qualification of the complete structure.

  19. Compatibility tests of materials for a lithium-cooled space power reactor concept

    NASA Technical Reports Server (NTRS)

    Sinclair, J. H.

    1973-01-01

    Materials for a lithium-cooled space power reactor concept must be chemically compatible for up to 50,000 hr at high temperature. Capsule tests at 1040 C (1900 F) were made of material combinations of prime interest: T-111 in direct contact with uranium mononitride (UN), Un in vacuum separated from T-111 by tungsten wire, UN with various oxygen impurity levels enclosed in tungsten wire lithium-filled T-111 capsules, and TZM and lithium together in T-111 capsules. All combinations were compatible for over 2800 hr except for T-111 in direct contact with UN.

  20. Prime Contractors with Awards Over $25,000 by Major System, Contractor and State. Part 2. AVJ Navy OV-10 Coin (Now Bronco) thru SMR Navy Swygert Shipyards, Inc.

    DTIC Science & Technology

    1991-01-01

    L. ..4L L.C11-- -4If’ I .d m a. ə -II 01-0 -. > Ln C. 00SI. . oIL W - 4 () I- I -.40." .- 4 - 4 a-4aa4WLa r 1W.4 Iu00T -4 -14 0-I VI - n- :a 4- - 0...01 &M10.00.0 = -.0-D- CD .I 0%. 0.CA (J U I 00 - s _ 4L W))0 to1) (nO U) OIL -MMUU)flml 0U)EU )- )Cto IA0 0 0) (/) I " ZOJ 00 0- 0 0 00 0 0 . 0 0 0 0...i Cl) 0. .j zo C) cc ~ 0 10C31 C) w w <- >. ix LaJOZ < V) 0 0 f 𔃺 C- I OiL 0 -1 (Xi 0 1. 1--1- - Lu 0.L m I I .iZ 0 L 0 (1 L 0 41 0 "- M~OO 0 01

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    No, author

    This report summarizes the outcome of U.S. Department of Energy (DOE) contract DE-OE0000543, requesting the design of a Cryptographic Key Management System (CKMS) for the secure management of cryptographic keys for the energy sector infrastructure. Prime contractor Sypris Electronics, in collaboration with Oak Ridge National Laboratories (ORNL), Electric Power Research Institute (EPRI), Valicore Technologies, and Purdue University's Center for Education and Research in Information Assurance and Security (CERIAS) and Smart Meter Integration Laboratory (SMIL), has designed, developed and evaluated the CKMS solution. We provide an overview of the project in Section 3, review the core contributions of all contractors inmore » Section 4, and discuss bene ts to the DOE in Section 5. In Section 6 we describe the technical construction of the CKMS solution, and review its key contributions in Section 6.9. Section 7 describes the evaluation and demonstration of the CKMS solution in different environments. We summarize the key project objectives in Section 8, list publications resulting from the project in Section 9, and conclude with a discussion on commercialization in Section 10 and future work in Section 11.« less

  2. U.S. Nuclear Weapons: Changes in Policy and Force Structure

    DTIC Science & Technology

    2008-01-23

    Pinellas Plant , in Clearwater, FL; and the Pantex Plant near Amarillo, TX. These facilities were also operated by industrial contractors. Finally, the...These included the Rocky Flats Plant , outside Denver, CO; the Kansas City Plant , near Kansas City, MO; the Mound Plant , near Dayton OH; the...In 1988, DOE closed the nuclear reactors at Hanford and Savannah River, in response to safety concerns. The Rocky Flats Plant , which produced the

  3. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 7: PEP logistics and training plan requirements

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Recommendations for logistics activities and logistics planning are presented based on the assumption that a system prime contractor will perform logistics functions to support all program hardware and will implement a logistics system to include the planning and provision of products and services to assure cost effective coverage of the following: maintainability; maintenance; spares and supply support; fuels; pressurants and fluids; operations and maintenance documentation training; preservation, packaging and packing; transportation and handling; storage; and logistics management information reporting. The training courses, manpower, materials, and training aids required will be identified and implemented in a training program.

  4. Development of LM10-MIRA LOX/LNG expander cycle demonstrator engine

    NASA Astrophysics Data System (ADS)

    Rudnykh, Mikhail; Carapellese, Stefano; Liuzzi, Daniele; Arione, Luigi; Caggiano, Giuseppe; Bellomi, Paolo; D'Aversa, Emanuela; Pellegrini, Rocco; Lobov, S. D.; Gurtovoy, A. A.; Rachuk, V. S.

    2016-09-01

    This article contains results of joint works by Konstruktorskoe Buro Khimavtomatiki (KBKhA, Russia) and AVIO Company (Italy) on creation of the LM10-MIRA liquid-propellant rocket demonstrator engine for the third stage of the upgraded "Vega" launcher.Scientific and research activities conducted by KBKhA and AVIO in 2007-2014 in the frame of the LYRA Program, funded by the Italian Space Agency, with ELV as Prime contractor, and under dedicated ASI-Roscosmos inter-agencies agreement, were aimed at development and testing of a 7.5 t thrust expander cycle demonstrator engine propelled by oxygen and liquid natural gas (further referred to as LNG).

  5. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, Fiscal Year 1987. Part 6. Donnegan Systems, Incorporated-Fairfield Machine Company, Incorporated.

    DTIC Science & Technology

    1987-01-01

    go- 0 00 0C0 C 00 000 00 0 10 CC I M .COCO Z- - - r-F P- -- rI , zt zt ,r - z - z - - I-- Zol I MOOC I,4-~- CON-00N <C 0-4 00- 4 00 <o C4-4-- 00040-4...InI 1 - In I- P. - --f- 1( ar - -r 1 P rf- -QvQv0vf- - - 0L I W I (AO MOOC Ll 70 CAC co V)00 0 n 0 0120000CO0 (10000 V) 00 0 (.12 00 0 0000

  6. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place. Part 19. (Tube Manufacturing Co., Inc.-Voith-Turbo GMBH & Co. KG)

    DTIC Science & Technology

    1989-01-01

    R RT PForm Approved OMB No. 0704-0188 PuOlic reporting ourden for this collection of information is estimated to average I hour per response... collection of information. Sena comments regarding this burden estimate or any other aspect of this collection of information, including suggestions...00 0 00Oc0 oc00000000c ODK IS1 aK N K L In K 01.0 11 K -e O 1 in0 qqI 4444444444444444444444444 * 0-4C’~i ) 0-4 C’) 0II II -4C Wr MI 00 00 00 00 0

  7. Navy Tactical Ocean Optical Products from the National Polar-orbiting Operational Environmental Satellite System (NPOESS)

    NASA Astrophysics Data System (ADS)

    Lyon, P. E.; Arnone, R.

    2006-12-01

    The Naval Research Laboratory at Stennis Space Center (NRLSSC) is preparing to produce optical products for Naval operations support from the National Polar-orbiting Operational Environmental Satellite System (NPOESS). This effort will leverage existing hardware and software systems in place at NRLSSC which are currently used to produce optical products from current sensors SeaWiFS and MODIS Aqua/Terra. This effort is part of an inter agency collaboration between NASA, NOAA, IPO, NRL and the prime contractor for NPOESS, Northrop Grumman / Raytheon. This poster presents an outline of the NRLSSC's plan for achieving the best possible optical products from NPOESS.

  8. KSC-2009-2311

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – The first Ares I-X motor segment is in the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  9. Assessment of Offshore Wind System Design, Safety, and Operation Standards

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sirnivas, Senu; Musial, Walt; Bailey, Bruce

    This report is a deliverable for a project sponsored by the U.S. Department of Energy (DOE) entitled National Offshore Wind Energy Resource and Design Data Campaign -- Analysis and Collaboration (contract number DE-EE0005372; prime contractor -- AWS Truepower). The project objective is to supplement, facilitate, and enhance ongoing multiagency efforts to develop an integrated national offshore wind energy data network. The results of this initiative are intended to 1) produce a comprehensive definition of relevant met-ocean resource assets and needs and design standards, and 2) provide a basis for recommendations for meeting offshore wind energy industry data and design certificationmore » requirements.« less

  10. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place. Part 14. (Nor Cal Aerospace-PHP Healthcare Corporation)

    DTIC Science & Technology

    1989-01-01

    01111101000004 0101001011014 01 01-00101010010101010 41 it Ic - If 000000000000001 00 00 00 0000000- 00 000000000m0000000000000 cell IWN- 11 0 0 11 1 004 If I...3 If 411 W .1II 100 I0 0.10 < II CIS 0 I ’C- ) el4 of 0.4 ca 0I oc i 0 000 N3U MM I.0U mWL.WA A0 _CL.I 0 (.) 0- "I 0I 4CJ"Ŕ , 4"C4(40 4 NCJ""N0 I l 1

  11. All Prime Contract Awards by State or Country, Place, and Contractor, FY 84. Part 3 (Acampo, California - Ozol, California).

    DTIC Science & Technology

    1984-01-01

    5 NL 0 I9 1I . 128 . 1.8 11125 .il N~l 6 MICROCOPY RESOLUTION TEST CHART NAMINAL RLIAtAU OF...8217Z I-- co 0 0D 0 - W r w. La - 5 IDC~ U) -U 0 C) If) - I) U 10ID I) ID 0 00C 000a0 00 0 (Os0 00 00 ( 0 0D 0 0 0 ( 0 0 ( . 0 -r, 0 0 0 C 00C 0 0 0 ... 0 ) LW F 0 1- O < 0 < 0 <OOF- L0 LU CD < 0

  12. Prime Contract Awards Over $25,000 by Major System, Contractor and State. Part 1. (AAA-BSG)

    DTIC Science & Technology

    1989-01-01

    estimated to average I hour per response. including the time for reviewng instructions searching existing data sources,gathering and maintaining the data ...JeffersonDavis highway. Suite 1204, Arlington, VA 22202,4302, and to the Office of Management and Budget. Paperwork Reduction Prolect (0704.018I), Washington, DC...IN W) MNMP l )C)C) ciMP l l1-I z cJ~ ICC cl IN C) 0(Du’)-. It) Nr.~- (DM In- - 141 I 4~~ t 06 0. E E I I CLcIcII T . I I UcI . u ) c ct)a 4)C ) wa

  13. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, Fiscal Year 1985. Part 3 (Bay Oil Company - Burns Lumber Co. Inc).

    DTIC Science & Technology

    1985-01-01

    FIELD GROUP SUB-GROUP 18...OOOO OOOO OOOO OOOO cocomm 00 OOOO 00 U i CO CO CO OOOO 17) 131 (3) O) <<<< o Q _J X IV) LU r> _J CO 4 H OtOCOCOCDCOtDCOCOCOCO...v^^;ov%-,:vSS:>:-:-^ !" • »\\- WVA""* ».* ’.* I • •••" M’^,𔃻 ’• Mill i.’Vm’ ’.I •M»».< ’," »WP.W » »n » n ».•• ^mmii^i I ..... ^ ... .^ rm £, .

  14. KSC-2012-5809

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Bob Cabana, director of the Kennedy Space Center in Florida, spoke during opening ceremonies at the Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  15. KSC-2012-5806

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Bruce Deardoff, Canaveral Port Authority Commission chairman, spoke during opening ceremonies at the Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  16. KSC-2012-5810

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Bob Cabana, director of the Kennedy Space Center in Florida, spoke during opening ceremonies at the Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  17. KSC-2012-5812

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – David Radzanowski, NASA chief of staff, spoke during opening ceremonies at the Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  18. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for RDT&E (Research, Development, Test and Evaluation), Fiscal Year 1977.

    DTIC Science & Technology

    1977-01-01

    ENGINEERING INC * 2 e GENERAL i:tT~ LU l4 e DEWEEY ELECI-ONICS CORP It 160 E GENERAL I % 5TkUM E’t: 61.mP 9 43 DIGITAL CCt.MUNICATIONS C3O* 49 8...NORTHROP CORP • 63 h RANE CORP -- , 424 N NORTHWESTERN UNIVERSITY 4 .27 E RAYCLPN INOUSTKIES INC 383 8 OCEAN DATA SYSTEMS INC • 481 8 RAYPhNO ENGINEERING ...CONTROL INC . 344 h VIRGLNIA UNIVEkSITY (.;F 268 a SYSTEMS ENGINE -ING LAdORATONIES * 366 e VISIDYNE INC 26? 8 SYSTEMS EXPLOQATICN INC * 62 e VOUGHT CORP

  19. Fully Integral, Flexible Composite Driveshaft

    NASA Technical Reports Server (NTRS)

    Lawrie, Duncan

    2014-01-01

    An all-composite driveshaft incorporating integral flexible diaphragms was developed for prime contractor testing. This new approach makes obsolete the split lines required to attach metallic flex elements and either metallic or composite spacing tubes in current solutions. Subcritical driveshaft weights can be achieved that are half that of incumbent technology for typical rotary wing shaft lengths. Spacing tubes compose an integral part of the initial tooling but remain part of the finished shaft and control natural frequencies and torsional stability. A concurrently engineered manufacturing process and design for performance competes with incumbent solutions at significantly lower weight and with the probability of improved damage tolerance and fatigue life.

  20. Quality assurance and control in the production and static tests of the solid rocket boosters for the Space Shuttle

    NASA Technical Reports Server (NTRS)

    Cerny, O. F.

    1979-01-01

    The paper surveys the various aspects of design and overhaul of the solid rocket boosters. It is noted that quality control is an integral part of the design specifications. Attention is given to the production process which is optimized towards highest quality. Also discussed is the role of the DCA (Defense Contract Administration) in inspecting the products of subcontractors, noting that the USAF performs this role for prime contractors. Fabrication and construction of the booster is detailed with attention given to the lining of the booster cylinder and the mixing of the propellant and the subsequent X-ray inspection.

  1. The Third Temple’s Holy of Holies: Israel’s Nuclear Weapons

    DTIC Science & Technology

    1999-09-01

    explored the Negev Desert for uranium deposits on orders from the Israeli Ministry of Defense. By 1950, they found low-grade deposits near Beersheba and...capable of delivering nuclear bombs.21 French experts secretly built the Israeli reactor underground at Dimona, in the Negev desert of southern Israel...near Beersheba. Hundreds of French engineers and technicians filled Beersheba, the biggest town in the Negev . Many of the same contractors who built

  2. Synthesis and characterization of nanoscale molybdenum sulfide catalysts by controlled gas phase decomposition of Mo(CO){sub 6} and H{sub 2}S

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Close, M.R.; Petersen, J.L.; Kugler, E.L.

    1999-04-05

    Molybdenum sulfide catalysts with surface areas ranging from 16 to 120 m{sup 2}/g were prepared by the thermal decomposition of Mo(CO){sub 6} and H{sub 2}S vapors in a specially designed tubular reactor system. The gas phase decomposition (GPD) reactions performed at 500--1100 C produced only MoS{sub 2} when excess H{sub 2}S was used. The optimum temperature range for the high-yield production of MoS{sub 2} was from 500 to 700 C. By controlling the decomposition temperature, the Mo(CO){sub 6} partial pressure, or the inert gas flow rate, the surface area, oxidation state, chemical composition, and the grain size of the molybdenummore » sulfide product(s) were modified. At reactor temperatures between 300 and 400 C, lower valent molybdenum sulfide materials, which were sulfur deficient relative to MoS{sub 2}, were obtained with formal molybdenum oxidation states intermediate to those found for Chevrel phase compounds, M{prime}Mo{sub 6}S{sub 8} (M{prime} = Fe, Ni, Co) and MoS{sub 2}. By lowering the H{sub 2}S flow rate used for the GPD reaction at 1000 C, mixtures containing variable amounts of MoS{sub 2} and Mo{sub 2}S{sub 3} were produced. Thus, through the modification of critical reactor parameters used for these GPD reactions, fundamental material properties were controlled.« less

  3. Experimental Plans for Subsystems of a Shock Wave Driven Gas Core Reactor

    NASA Technical Reports Server (NTRS)

    Kazeminezhad, F.; Anghai, S.

    2008-01-01

    This Contractor Report proposes a number of plans for experiments on subsystems of a shock wave driven pulsed magnetic induction gas core reactor (PMI-GCR, or PMD-GCR pulsed magnet driven gas core reactor). Computer models of shock generation and collision in a large-scale PMI-GCR shock tube have been performed. Based upon the simulation results a number of issues arose that can only be addressed adequately by capturing experimental data on high pressure (approx.1 atmosphere or greater) partial plasma shock wave effects in large bore shock tubes ( 10 cm radius). There are three main subsystems that are of immediate interest (for appraisal of the concept viability). These are (1) the shock generation in a high pressure gas using either a plasma thruster or pulsed high magnetic field, (2) collision of MHD or gas dynamic shocks, their interaction time, and collision pile-up region thickness, and (3) magnetic flux compression power generation (not included here).

  4. Our Next Two Steps for Fukushima Daiichi Muon Tomography

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miyadera, Haruo

    2012-04-11

    After the vast disasters caused by the great earthquake and tsunami in eastern Japan, we proposed applying our Muon Tomography (MT) technique to help and improve the emergency situation at Fukushima Daiichi using cosmic-ray muons. A reactor-tomography team was formed at LANL which was supported by the Laboratory as a response to a request by the former Japanese Prime Minister, Naoto Kan. Our goal is to help the Japanese people and support remediation of the reactors. At LANL, we have carried out a proof-of-principle technical demonstration and simulation studies that established the feasibility of MT to image a reactor core.more » This proposal covers the next two critical steps for Fukushima Daiichi Muon Imaging: (1) undertake case study mock-up experiments of Fukushima Daiichi, and (2) system optimization. We requested funding to the US and Japanese government to assess damage of reactors at Fukushima Daiichi. The two steps will bring our project to the 'ready-to-go' level.« less

  5. The Saturn management concept

    NASA Technical Reports Server (NTRS)

    Bilstein, R. E.

    1974-01-01

    Management of the Saturn launch vehicles was an evolutionary process, requiring constant interaction between NASA Headquarters, the Marshall Space Flight Center (particularly the Saturn 5 Program Office), and the various prime contractors. Successful Saturn management was a blend of the decades of experience of the von Braun team, management concepts from the Army, Navy, Air Force, and Government, and private industry. The Saturn 5 Program Office shared a unique relationship with the Apollo Program Office at NASA Headquarters. Much of the success of the Saturn 5 Program Office was based on its painstaking attention to detail, emphasis on individual responsibilities (backed up by comprehensive program element plans and management matrices), and a high degree of visibility as embodied in the Program Control Center.

  6. All Prime Contract Awards by State or Country, and Contractor. Part 7. (Adel Georgia - La Grange Illinois)

    DTIC Science & Technology

    1990-01-01

    Ien’) I C)(o0)N00.-40oC’) 0 -iN4 C’ ) In .-4 00 T’ 0000 11I 1 IeC )- Ir Oi404-i" N - C’) 0> N 00 1i Iec (, it 0 -4 N CN ) In t0) 00I,_ ON)l 0 -4 Tr(0 vt...N 2N Z* 0-4 ZN c" D-4 U) 11. o zo 61010 - C> 0000 .40 cno000 ILOC 1-40 (00 40 00, LL M( -.1 ck -4 W-1U0-11 I KL) .000 4ɘ -000 20 0 0) -to co0 ZNC 1

  7. Prime Contract Awards by State or Country, Place and Contractor. Part 3 (Lodi, California - Saint Helena, California), FY1991

    DTIC Science & Technology

    1991-01-01

    ea0-4 Nm z (022 222(D Z1) ( ULL. .L L. WO LL A-l.. c2Zz U’) >2z ə 0 itUN o l 0) r- 0 0o 0D 00 -4 N" IX of < ) Nf Ijww - -. 1 c") 00 -4-4 -4 -4 11 1...on v ~ (()C) n =C’) 0D K1 = 0(0 xI ZO 00 00 0000 00 0000 0000 X0000 moo Zoo M000000 ZODOOOOOO Zoo 0) K 0 I t 0(D < I to ) in inCI)11UUI) ini SALE )n ni

  8. 1st Stage Separation Aerodynamics Of VEGA Launcher

    NASA Astrophysics Data System (ADS)

    Genito, M.; Paglia, F.; Mogavero, A.; Barbagallo, D.

    2011-05-01

    VEGA is an European launch vehicle under development by the Prime Contractor ELV S.p.A. in the frame of an ESA contract. It is constituted by four stages, dedicated to the scientific/commercial market of small satellites (300 ÷ 2500 kg) into Low Earth Orbits, with inclinations ranging from 5.2° up to Sun Synchronous Orbits and with altitude ranging from 300 to 1500 km. Aim of this paper is to present a study of flow field due to retro-rockets impingement during the 1st stage VEGA separation phase. In particular the main goal of the present work is to present the aerodynamic activities performed for the justification of the separation phase.

  9. JWST Full-Scale Model on Display in Germany

    NASA Image and Video Library

    2010-03-10

    JWST Full-Scale Model on Display. A full-scale model of the James Webb Space Telescope was built by the prime contractor, Northrop Grumman, to provide a better understanding of the size, scale and complexity of this satellite. The model is constructed mainly of aluminum and steel, weighs 12,000 lb., and is approximately 80 feet long, 40 feet wide and 40 feet tall. The model requires 2 trucks to ship it and assembly takes a crew of 12 approximately four days. This model has travelled to a few sites since 2005. The photographs below were taken at some of its destinations. The model is pictured here in Munich, Germany Credit: EADS Astrium

  10. JWST Full-Scale Model on Display in Germany

    NASA Image and Video Library

    2017-12-08

    JWST Full-Scale Model on Display. A full-scale model of the James Webb Space Telescope was built by the prime contractor, Northrop Grumman, to provide a better understanding of the size, scale and complexity of this satellite. The model is constructed mainly of aluminum and steel, weighs 12,000 lb., and is approximately 80 feet long, 40 feet wide and 40 feet tall. The model requires 2 trucks to ship it and assembly takes a crew of 12 approximately four days. This model has travelled to a few sites since 2005. The photographs below were taken at some of its destinations. The model is pictured here in Munich, Germany Credit: EADS Astrium

  11. All Prime Contract Awards by State or Country, Place, and Contractor. Part 4 (San Diego, California-Victorville, California)

    DTIC Science & Technology

    1990-01-01

    4 N 41, <- ɘ) 41 - <-40 MI C-4 04 N NNNNN04N N\\CN 0 40 40 -4 ’-4 0) 0 00C Oi MC-4 Ilr-4--44l"I4.4- -1.44 -f-4 1- 0 Coco c)0 41 W C oc NOWO H1-1 W...zoo4 Cn-44.-44-4- 0)0000o00000000 =1310- it I CI t 347 ) 00 NC- o 7 f40 -100 00(0) 2 1((( (0(0 a)0 _ NO) 0 OOOOOOOOO))C)0)0)C M 14 04 1-0 1- < 0 CA: 0Z

  12. KSC-07pd3622

    NASA Image and Video Library

    2007-12-12

    WASHINGTON, D.C. -- (From left) Brewster Shaw, vice president and genral manager of Boeing Space Exploration; Jeff Hanley, Constellation Program manager; Danny Davis, Upper Stage Element manager; Steve Cook, Ares Project manager; Doug Cooke, deputy associate administrator for Exploration Systems; and Rick Gilbrech, associate administrator for Space Exploration, stand with a model of the Ares I rocket on Dec. 12, 2007, at NASA Headquarters in Washington. NASA has selected The Boeing Company of Huntsville, Ala., as the prime contractor to produce, deliver and install avionics systsems for the Ares I rocket that will launch the Orion crew exploration vehicle into orbit. The selection is the final major contract award for Ares I. Photo credit: NASA/Paul E. Alers

  13. Aerospace Safety Advisory Panel

    NASA Technical Reports Server (NTRS)

    1984-01-01

    An assessment of NASA's safety performance for 1983 affirms that NASA Headquarters and Center management teams continue to hold the safety of manned flight to be their prime concern, and that essential effort and resources are allocated for maintaining safety in all of the development and operational programs. Those conclusions most worthy of NASA management concentration are given along with recommendations for action concerning; product quality and utility; space shuttle main engine; landing gear; logistics and management; orbiter structural loads, landing speed, and pitch control; the shuttle processing contractor; and the safety of flight operations. It appears that much needs to be done before the Space Transportation System can achieve the reliability necessary for safe, high rate, low cost operations.

  14. KSC-2009-2320

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, technicians check the fit of the end cover on the Ares I-X motor segment. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  15. KSC-2009-2321

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, the open end of the Ares I-X motor segment is seen without the end cover. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  16. KSC-2009-2319

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, a technician begins propellant grain inspection of the interior of the Ares I-X motor segment. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  17. KSC-2009-2316

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, the Ares I-X motor segment waits for inspection after removal of the shipping container. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  18. KSC-2009-2322

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, a technician performs propellant grain inspection of the inside of the Ares I-X motor segment. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  19. KSC-2009-2314

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, the rail car cover is moved away from the first Ares I-X motor segment. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  20. KSC-2009-2315

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, the Ares I-X motor segment is revealed after removal of the rail car cover. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  1. KSC-2009-2313

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, the rail car cover is removed from the first Ares I-X motor segment. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  2. KSC-2009-2312

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, the rail car cover is removed from the first Ares I-X motor segment. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  3. All Prime Contract Awards by State or Country, Place, and Contractor, FY 85. Part 5 (Arapahoe, Colorado - Washington, D.C.).

    DTIC Science & Technology

    1985-01-01

    444444. < MW 0 U 0. U <- OU cI- 0 < :412 8-4 M" I= Ul N >9 ? -4 cc0 a* N - 00 W(0 w.1 co. o U jNNc)InD9- i901I 00 0-4 <-4 Ufl." 20 > -4 ado 30 CI0 1... Porno .....) 4 : W&P 040( 0-I4 4004444 44040000004-44-40.44.44.44-44.44.--4-4.4.4-4.-44-4-4.40.44- I.- do I I a -’ ~ ~ N I , ICPN -440flOo r ntOO40 0-N

  4. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, FY 88. Part 11. (International Corporation-La Ronda)

    DTIC Science & Technology

    1988-01-01

    0 0 cau ( 5 . 4A 0 . d) - W 0 4Ao 0 C00 C -4 43 CL ..4 430 o m 0 ... 0 - CL- W 4 3 U 0 0c- 0 CI 0 -4 m. 43. 03 4 5 . 0 00 ’. C 43 S -4 Sn aW ’- 4 0 4 . 0 < _4 0 4w E E -4 - 06 M4 mW cc 5 . 0 4W .o . 0 2~. ~ c .= 0 >1 0 E3 2... 0 0 003 N, *- to C) 0 N4 U 4 -% -m U 0 -4 .-.4 3 C 4 -40 0

  5. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for RDT&E (Research, Development, Test and Evaluation), Fiscal Year 1978.

    DTIC Science & Technology

    1978-01-01

    HEIGHT MASS FtA NEWTON MASS 317 I?r INDUSTRIAL ELECTRIC MOTORS INC S 9A0 9 WEST ALLIS WISCONSIN 960 3068 AFRODYNE RESEARCH INC s 1.07? W BEDFORD MASS...9,838 WATERTON COLORADO 1,766 PITTSFIELO MASS Z6.627 ORLANDO FLORIDA IT1,678 WEST LYNN MASS 18s.04b BALTIMORE MARYLAND 379 WILMINGTON MASS $69 IN...NEEDHAM MASS 11,.57 STRATFORD CONN 5q ,5A Q NEEDHAM HEIGHT MASS 4.0, 64f WINDSOR LOCKS rONN I.A62 WHITE SANDS MS NEW MEXICO 83 WEST PALM SFAC FLORIDA bR

  6. An Overview of the James Webb Space Telescope (JWST) Project

    NASA Technical Reports Server (NTRS)

    Sabelhaus, Phillip A.

    2004-01-01

    The JWST project at the GSFC is responsible for the development, launch, operations and science data processing for the James Webb Space Telescope. The JWST project is currently in phase B with its launch scheduled for August 2011. The project is a partnership between NASA, ESA and CSA. The U.S. JWST team is now fully in place with the recent selection of Northrop Grumman Space Technology (NGST) as the prime contractor for the telescope and the Space Telescope Science Institute (STScI) as the mission operations and science data processing lead. This paper will provide an overview of the current JWST architecture and mission status including technology developments and risks.

  7. An Overview of the James Webb Space Telescope (JWST) Project

    NASA Technical Reports Server (NTRS)

    Sabelhaus, Phillip A.; Campbell, Doug; Clampin, Mark; Decker, John; Greenhouse, Matt; Johns, Alan; Menzel, Mike; Smith, Robert; Sullivan, Pam

    2005-01-01

    The JWST project at the GSFC is responsible for the development, launch, operations and science data processing for the James Webb Space Telescope. The JWST project is currently in phase B with its launch scheduled for August 2011. The project is a partnership between NASA, ESA and CSA. The U.S. JWST team is now fully in place with the selection of Northrop Grumman Space Technology (NGST) as the prime contractor for the telescope and the Space Telescope Science Institute (STScI) as the mission operations and science data processing lead. This paper will provide an overview of the current JWST architecture and mission status including technology developments and risks.

  8. All Prime Contract Awards by State or Country, Place and Contractor. Part 4. (San Buenaventura, California-Ventura, California)

    DTIC Science & Technology

    1989-01-01

    40 .4M %-4- -4h Ch4 InN0NN N .- 4 .W 00-o4< -s~ ti4N 40 N -,4- -.4.4"N -f 4000000a -4N -4 -- 4N < I 1 Go4N 61 U0000 (AN *0)d 40 40- IRSN ...4NCI -4 4-4I.I -40 -4-I4 -I-I .- 4-4-4 -1-4 4.4 -NN II K M -40,4 K n $13 IN 00>->-)-* fie IV> 4 La f4>)-* PON IRSN mu(00* IGO. KEIO-4o oz2 02 0222Z

  9. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, FY 85. Part 21 (Video Animation Systems Inc - Zytron Corporation).

    DTIC Science & Technology

    1985-01-01

    22202-4302 ; a NAM E 0- FUND’NG ’SPONSORING Bb OFFICE SYMBOL 9 PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER7 0 RGAN IZ A nON (if applicable) ’, fy Stare...CODES 18. SUBJECT TERMS (Continue on reverse if necessary and identify by block number) rIELD GROUP SUB-GROUP 9 ABSTRACT (Continue on reverse if necessary...used untl exhausted. SECURITY CLASSIFICATION OF THIS PAGE 86 3 18 135 ’- . * -’ -" LLJi -- <ZO z. I.D K Z. %.) v 0w 0- a La Z. L.-J. _ju j V) 9 , 1. caZ0 0

  10. Dollar Summary of Prime Contract Awards by State, County, Contractor and Place. Part 3 (Midland-Monroe)

    DTIC Science & Technology

    1990-01-01

    O O OM J M-J in I - 00 .4 20 W N V 6444 0 600 . 00IOU I 40 M 4cI us I WL.ICIIn0 4 M4 z I I > -0 > MIDI AD M1 1-00 0 - 0 - to0000 300 0-1 0 IW WWwo-0...C W 0 I.-. a01 " 0 Z OJO w 01- I.- &Z 4% 3% wav Ww" Z" Wl.M% W% Ř CA 0 cc .4 1. w 1. -L- W -F = -Z " " W I-~ft- Z" 0 44 2o oo o 0: a-& a-la .40amoa

  11. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place. Part 15. (Phraxos Research and Dev.-Robert E. Compton DDS)

    DTIC Science & Technology

    1989-01-01

    34* at N Ce. j C, w-jCj " L- 00 (D ( WN(N* a " -4- 4II0I(-4NIILLI >* w >* w j* Ua >>* at M ( IL( (D WAV )A V) a)N = 1, IiEI(0-40 liOZ2ZZz CZZ OZZ 022 02...4 -4N L-4N Cj-4 (D -4 l3. - : MOM : I1(D(D 0( N a)~ CD to44444 0-4-4-4 to-4 (a MIDI c0 40 000( MO CO -1 >N 04 C)C’’ .ULL)Ln InU WJ 11 1 ((0 11 W00

  12. KSC-2012-5808

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Col. Rory Welch, vice commander for the 45th Space Wing at Patrick Air Force Base, spoke during opening ceremonies at the Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  13. KSC-2012-5805

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Greg Weiner, senior director of Business Development for the Economic Development Commission of Florida’s Space Coast, spoke during opening ceremonies at the Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  14. KSC-2012-5811

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Glenn Delgado, NASA associate administrator for the Office of Small Business Programs, spoke during opening ceremonies at the Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  15. KSC-2012-5807

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Larry Third, NASA small business specialist at the Kennedy Space Center in Florida, spoke during opening ceremonies at the Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  16. KSC-2012-5804

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Larry Third, NASA small business specialist at the Kennedy Space Center in Florida, spoke during opening ceremonies at the Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  17. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, Fiscal Year 1985. Part 10 (Hi Plains Supply - International Cnslt Eng Inc).

    DTIC Science & Technology

    1985-01-01

    cccC’-4.4 J-4-4 0,30----44.4f. w I(0 .41 -0)0000000 (00000 0)0 0)0)00000000 0ɘ (0(0c, f6 (0 .4ICCCCC ACC 1 ococo w w Wc co 0 000 000 n o00000 0 o...W00O00000000 woo0 INNC 1(0 .41200000000 200000 zoo 200000000000 2000 2WW F.- Im "W ww ww 11C(UCAAAA -4U)nCh cnAA(A 0-4IACA C ACCA ACCWj IC(nC (n -4<< o󈧎

  18. The Shuttle processing contractors (SPC) reliability program at the Kennedy Space Center - The real world

    NASA Astrophysics Data System (ADS)

    McCrea, Terry

    The Shuttle Processing Contract (SPC) workforce consists of Lockheed Space Operations Co. as prime contractor, with Grumman, Thiokol Corporation, and Johnson Controls World Services as subcontractors. During the design phase, reliability engineering is instrumental in influencing the development of systems that meet the Shuttle fail-safe program requirements. Reliability engineers accomplish this objective by performing FMEA (failure modes and effects analysis) to identify potential single failure points. When technology, time, or resources do not permit a redesign to eliminate a single failure point, the single failure point information is formatted into a change request and presented to senior management of SPC and NASA for risk acceptance. In parallel with the FMEA, safety engineering conducts a hazard analysis to assure that potential hazards to personnel are assessed. The combined effort (FMEA and hazard analysis) is published as a system assurance analysis. Special ground rules and techniques are developed to perform and present the analysis. The reliability program at KSC is vigorously pursued, and has been extremely successful. The ground support equipment and facilities used to launch and land the Space Shuttle maintain an excellent reliability record.

  19. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place. Part 8. (General Contractor, Inc.-H and H Industrial Instruments)

    DTIC Science & Technology

    1989-01-01

    4C>Qa0 QQ aQD1> 4 0-4 - 4 - 4-o4 - 4 - 4->Q0 o00 > > > Cell . 0c4 IC1 l’(0< 40 I O O O O O O O O O O O O O O O O O O O (n3IU 1 m C𔃾 11.0 C3 xO O O O O...In it el4 យ C-4 il.J 4 44 4 4 4 44 4 4 4 X"""NI (D00)0) 000 (0 (04C) 1 U0I co-4 1I N4 4 4 4 4 44 4 4 4 r44 QNO 40 m NQ Is .1 II 0-4 11 0 0 0 0 00 0 0...C C II C0 1- 0 1- 11 to I MN 11 - 1-4 iil Wcs n z 2 i Z - I WNC 110010>C 20 C O>l 0 a 2 - 0- Oil El4 eJ 1140 1- 0 C’ I-i-i c Il linN - I it4 ". z - I

  20. Japans Defense Program Guidelines

    DTIC Science & Technology

    2013-03-01

    matters worse, the tsunami damaged the nuclear reactors at the Tokyo Electric Power Company’s Fukushima 10 Daiichi Nuclear Power Station, causing...response to the nuclear disaster with maximum personnel numbers exceeding 100,000. In order to strengthen those activities, the SDF established the...that prohibits some kinds of military activity.1 After the outbreak of the Korean War, Prime Minister Shigeru Yoshida’s government created a heavily

  1. A Rainbow View of NASA's RS-25 Engine Test

    NASA Image and Video Library

    2017-02-22

    NASA engineers conducted their first RS-25 test of 2017 on the A-1 Test Stand at Stennis Space Center near Bay St. Louis, Mississippi, on Feb. 22, continuing to collect data on the performance of the rocket engine that will help power the new Space Launch System (SLS) rocket. Shown from the viewpoint of an overhead drone, the test of development engine No. 0528 ran the scheduled 380 seconds (six minutes and 20 seconds), allowing engineers to monitor various engine operating conditions. The test represents another step forward in development of the rocket that will launch humans aboard Orion deeper into space than ever before. Four RS-25 engines, together with a pair of solid rocket boosters, will power the SLS at launch on its deep-space missions. The engines for the first four SLS flights are former space shuttle main engines, which were tested extensively at Stennis and are some of the most proven engines in the world. Engineers are conducting an ongoing series of tests this year for SLS on both development and flight engines for future flights to ensure the engine, outfitted with a new controller, can perform at the higher level under a variety of conditions and situations. Stennis is also preparing its B-2 Test Stand to test the core stage for the first SLS flight with Orion, known as Exploration Mission-1. That testing will involve installing the flight stage on the stand and firing its four RS-25 engines simultaneously, just as during an actual launch. The Feb. 22 test was conducted by Aerojet Rocketdyne and Syncom Space Services engineers and operators. Aerojet Rocketdyne is the prime contractor for the RS-25 engines. Syncom Space Services is the prime contractor for Stennis facilities and operations. PAO Name:Kim Henry Phone Number:256-544-1899 Email Address: kimberly.m.henry@nasa.gov

  2. NASA New England Outreach Center

    NASA Technical Reports Server (NTRS)

    2002-01-01

    The NASA New England Outreach Center in Nashua, New Hampshire was established to serve as a catalyst for heightening regional business awareness of NASA procurement, technology and commercialization opportunities. Emphasis is placed on small business participation, with the highest priority given to small disadvantaged businesses, women-owned businesses, HUBZone businesses, service disabled veteran owned businesses, and historically black colleges and universities and minority institutions. The Center assists firms and organizations to understand NASA requirements and to develop strategies to capture NASA related procurement and technology opportunities. The establishment of the NASA Outreach Center serves to stimulate business in a historically underserved area. NASA direct business awards have traditionally been highly present in the West, Midwest, South, and Southeast areas of the United States. The Center guides and assists businesses and organizations in the northeast to target opportunities within NASA and its prime contractors and capture business and technology opportunities. The Center employs an array of technology access, one-on-one meetings, seminars, site visits, and targeted conferences to acquaint Northeast firms and organizations with representatives from NASA and its prime contractors to learn about and discuss opportunities to do business and access the inventory of NASA technology. This stimulus of interaction also provides firms and organizations the opportunity to propose the use of their developed technology and ideas for current and future requirements at NASA. The Center provides a complement to the NASA Northeast Regional Technology Transfer Center in developing prospects for commercialization of NASA technology. In addition, the Center responds to local requests for assistance and NASA material and documents, and is available to address immediate concerns and needs in assessing opportunities, timely support to interact with NASA Centers on a local level, and develop easy access to information. The Center acts in the manner of a "NASA Center or Field Office" with direction from NASA Headquarters, Code K.

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moren, Richard J.; Grindstaff, Keith D.

    Hanford's Long-Term Stewardship (LTS) Program has evolved from a small, informal process, with minimal support, to a robust program that provides comprehensive transitions from cleanup contractors to long-term stewardship for post-cleanup requirements specified in the associated cleanup decision documents. The LTS Program has the responsibility for almost 100,000 acres of land, along with over 200 waste sites and will soon have six cocooned reactors. Close to 2,600 documents have been identified and tagged for storage in the LTS document library. The program has successfully completed six consecutive transitions over the last two years in support of the U.S. DOE Richlandmore » Operations Office's (DOE-RL) near-term cleanup objectives of significantly reducing the footprint of active cleanup operations for the River Corridor. The program has evolved from one that was initially responsible for defining and measuring Institutional Controls for the Hanford Site, to a comprehensive, post remediation surveillance and maintenance program that begins early in the transition process. In 2013, the first reactor area -- the cocooned 105-F Reactor and its surrounding 1,100 acres, called the F Area was transitioned. In another first, the program is expected to transition the five remaining cocooned reactors into the program through using a Transition and Turnover Package (TTP). As Hanford's LTS Program moves into the next few years, it will continue to build on a collaborative approach. The program has built strong relationships between contractors, regulators, tribes and stakeholders and with the U.S. Department of Energy's Office of Legacy Management (LM). The LTS Program has been working with LM since its inception. The transition process utilized LM's Site Transition Framework as one of the initial requirement documents and the Hanford Program continues to collaborate with LM today. One example of this collaboration is the development of the LTS Program's records management system in which, LM has been instrumental. The development of a rigorous data collection and records management systems has been influenced and built off of LMs success, which also ensures compatibility between what Hanford's LTS Program develops and LM. In another example, we are exploring a pilot project to ship records from the Hanford Site directly to LM for long-term storage. This pilot would gain program efficiencies so that records would be handled only once. Rather than storage on-site, then shipment to an interim Federal Records Center in Seattle, records would be shipped directly to LM. The Hanford LTS Program is working to best align programmatic processes, find efficiencies, and to benchmark site transition requirements. Involving the Hanford LTS Program early in the transition process with an integrated contractor and DOE team is helping to ensure that there is time to work through details on the completed remediation of transitioning areas. It also will allow for record documentation and storage for the future, and is an opportunity for the program to mature through the experiences that will be gained by implementing LTS Program activities over time.« less

  4. Development of PRIME for irradiation performance analysis of U-Mo/Al dispersion fuel

    NASA Astrophysics Data System (ADS)

    Jeong, Gwan Yoon; Kim, Yeon Soo; Jeong, Yong Jin; Park, Jong Man; Sohn, Dong-Seong

    2018-04-01

    A prediction code for the thermo-mechanical performance of research reactor fuel (PRIME) has been developed with the implementation of developed models to analyze the irradiation behavior of U-Mo dispersion fuel. The code is capable of predicting the two-dimensional thermal and mechanical performance of U-Mo dispersion fuel during irradiation. A finite element method was employed to solve the governing equations for thermal and mechanical equilibria. Temperature- and burnup-dependent material properties of the fuel meat constituents and cladding were used. The numerical solution schemes in PRIME were verified by benchmarking solutions obtained using a commercial finite element analysis program (ABAQUS). The code was validated using irradiation data from RERTR, HAMP-1, and E-FUTURE tests. The measured irradiation data used in the validation were IL thickness, volume fractions of fuel meat constituents for the thermal analysis, and profiles of the plate thickness changes and fuel meat swelling for the mechanical analysis. The prediction results were in good agreement with the measurement data for both thermal and mechanical analyses, confirming the validity of the code.

  5. All Prime Contract Awards by State or Country, Place and Contractor. Part 1. (Alexander City, Alabama-Sevier, Arkansas)

    DTIC Science & Technology

    1989-01-01

    Kf 0-4 a -54 -4.4.4 -4 4 -0 w.4 (0 c 0 W.4 0(0c 0.4 Oafs Oafs 0o l- Kom 0 ene (04 Kn m0 m 00000000 C2,40-4 0cr 00 ON4 on 00 00 to (04t KfC 4C N N...0 m-4 CD-C C00 N on VN Nli00 410-IOCD N In 4N T10 N0 01 C- 004 or-, 0)0-4-400V) 004- 00 -4 Infin I I C -C1 I4N Nf r- CY) 00 N-4 1-’ M 00 CO COO -4

  6. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place. Part 11 (Hilton Systems Inc -International Industries Inc)

    DTIC Science & Technology

    1990-01-01

    A11 10 m 4(1 CI (00 10 <D 0 1(0 (4 -1 -*It j-I -ti j 1 -114 -14 1N N r > KfC i i-I - of ’D I <( m it 4 44 LAO<< U)U IL- C LAO L𔃻 ~ I- Ai>> tor)> LNMMM...4 if Z InIn In in n toIn tr onIn In Z.10- 01 o( c > ) In In n InfLn InL In I n 20 C ZIn InfIn Z In 11. if-c I (0-4 11Ir nV no U1(1() on C )() 0 I a1

  7. Dollar Summary of Prime Contract Awards by Contractor, State or Country, and Place, FY 88. Part 3 (First Holdings Intl, Inc.-Kern Instruments, Inc.).

    DTIC Science & Technology

    1988-01-01

    CM 4 M VfU V0t0*00(0G 00 a. _) j cc( 0( Jr 0w c m to 4 ; nL n ( -4- - -C. 0).4 0000 O. m -4- 000 OI N Nl tD ) .?I i V o - C𔃾 CZ4 I0C4 ." -’ C14 0...27I 00. 00. C. 0A ) 0 z - - .-01 w4 w%~ in 0 0KI cc cc U C r (A 4 S z ( CL (A A (( II -I : l ft w- z- mml mm. . 0 4j m ’ C I I Of-l a w- 2 43 *.4 th

  8. KSC-2012-5829

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  9. KSC-2012-5815

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  10. KSC-2012-5828

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  11. KSC-2012-5818

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  12. KSC-2012-5814

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  13. All Prime Contract Awards by State or Country, Place, and Contractor. Part 18 (Elmo Texas-San Saba Texas)

    DTIC Science & Technology

    1990-01-01

    01D I0 WN 00 40C4 00 00 0 2 -i iniin moon 1-1 in0 0 0 -~i of 1-4 It1.0. 9- ) 0 r- 0L U. td ) U- 0- z r- ɘ C C 0 Qt I 10- 0 < xr4I NN 00) N j C" 000...p- co. 0-4 itBOOC 0. 40 aOO B-OO OOO Z B-B-B 00 C> W-4 B-B COB0-4 3H. 0 ) I.-0 UB U 000)-4 WO04L000000000 20 WOO P- C in fa 00-4 BBD ~ ~0 ccCe 00 00

  14. All Prime Contract Awards by State or Country, Place, and Contractor, FY 88. Part 4. (San Bruno, California-Yucca Valley, California).

    DTIC Science & Technology

    1988-01-01

    82174(0(o 0 0(0q t 0Z--J----< 000J0 0400 0 IEC / 00 I I -J...J3 3 03I x Lii 1 4 4 4 1 11 /1 T J N 040 0𔃾 100 () 004f0 a)Nc" t- a)000 V00t- 0)0m 0) 0 wr...CL. 00 00 0000 0000000000 .00 X o0’-4 1 . 61010 f n u D C 1 l C14 0(’J(’JC.JNOCO L 000000 01100 21 01( 0(100 01D 0.m10-4I f 4 V 4444 -*<<�

  15. All Prime Contract Awards by State or Country, Place, and Contractor, FY 88. Part 23. (Greenland-Morocco)

    DTIC Science & Technology

    1988-01-01

    8217-4 -4 4 -4 4 -4 aOO 0 I CI) m0-4-4m’ -4-4 -4 -4-4--4 in Ln in -4 U) U) 800-4 m c) c)0’)’ C’)0 m’ enC ) ’ C) C’) Cm -4 -I C11 1 0-40 Do( I0U-40 1 -4...0V)Ln U’ L nAnL) 0 0 l-0 z00000o OLL LADO viV LnA ,L UI m 0 20 0 1 102-4 I JOOOcOOOOoOOOO I 0 D ZOOOOO. *- qa U40 UlA1ILAiln0 00 I-12. 100000000 ZO

  16. All Prime Contract Awards by State or Country, Place, and Contractor, FY 85. Part 16 (Ashaway, Rhode Island - Woodstock, Tennessee).

    DTIC Science & Technology

    1985-01-01

    1LA LA 0)0 CC- CL4 0- Cl) -0 00 00 0’ ’E4 1<u 0 0 0 - * - 0𔃾 ( LADO a:0 1(JD C 0( (000 ((0 (0 0(0 to( L4 444 ɜ mi O O D4 34) 4n 44i 0~ CS414 < (-44...0001,- VI-I EU) .-. N CU EO Ec C ( EU)c) 0000Ioo- cO EOa I (0004 I am(00(0 41N0 410 ON" 4(0) Re t I 4 (41 414--m 10) m1 - 0004< f E0(0()4c ENC E-4 -IN4 W

  17. JWST Full-Scale Model on Display at GSFC

    NASA Image and Video Library

    2010-02-26

    JWST Full-Scale Model on Display. A full-scale model of the James Webb Space Telescope was built by the prime contractor, Northrop Grumman, to provide a better understanding of the size, scale and complexity of this satellite. The model is constructed mainly of aluminum and steel, weighs 12,000 lb., and is approximately 80 feet long, 40 feet wide and 40 feet tall. The model requires 2 trucks to ship it and assembly takes a crew of 12 approximately four days. This model has travelled to a few sites since 2005. The photographs below were taken at some of its destinations. The model is pictured here in Greenbelt, MD at the NASA Goddard Space Flight Center. Credit: NASA/Goddard Space Flight Center/Pat Izzo

  18. Work management plan for data systems and analysis directorate

    NASA Technical Reports Server (NTRS)

    Nichols, L. R.

    1979-01-01

    A contract with the Data Systems and Analysis Directorate contains a specified level of resources related to a specific set of work in support of three divisions within the Data Systems and Analysis Directorate. The divisions are Institutional Data Systems Division, Ground Data Systems Division, and Mission Planning and Analysis Division. The Statement of work defines at a functional requirements level the type of support to be provided to the three divisions. The contract provides for further technical direction to the contractor through issuance of Job Orders. The Job order is the prime method of further defining the work to be done, allocating a portion of the total resources in the contract to the defined tasks, and further delegating technical responsibility.

  19. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, Fiscal Year 1987. Part 12. Mantech International Corporation-Modular Devices, Incorporated.

    DTIC Science & Technology

    1987-01-01

    VLA00- VN00-.t0CO 00-4 000 -I 00 zo 00:< I-0.O- 4"NNmOOO t rNN 3-4-- 4CioL C) r ol0 00(1 300 0 )NO O <-0 :I Z v f- 0)(m(0( MOLA 0)4 40 ZIiIf0 N _( t- l...V0 < 0) lac .- 4I -4 .. 40) WI)v 4󈧄)Ř 4.--4 0 ~ ~ ~ ~ ~ -O c (00 0)-04-00- . -4 MOLA , C0) m -4 e -41-" .1 LA nII ’III IX (00< I 4 4-f-4 -- 4

  20. KSC00pp0596

    NASA Image and Video Library

    2000-04-27

    The one-man submarine dubbed DeepWorker 2000 sits on the deck of Liberty Star, one of two KSC solid rocket booster recovery ships. The sub is being tested on its ability to duplicate the sometimes hazardous job United Space Alliance (USA) divers perform to recover the expended boosters in the ocean after a launch. The boosters splash down in an impact area about 140 miles east of Jacksonville and after recovery are towed back to KSC for refurbishment by the specially rigged recovery ships. DeepWorker 2000 was built by Nuytco Research Ltd., North Vancouver, British Columbia. It is 8.25 feet long, 5.75 feet high, and weighs 3,800 pounds. USA is a prime contractor to NASA for the Space Shuttle program

  1. KSC-00pp0596

    NASA Image and Video Library

    2000-04-27

    The one-man submarine dubbed DeepWorker 2000 sits on the deck of Liberty Star, one of two KSC solid rocket booster recovery ships. The sub is being tested on its ability to duplicate the sometimes hazardous job United Space Alliance (USA) divers perform to recover the expended boosters in the ocean after a launch. The boosters splash down in an impact area about 140 miles east of Jacksonville and after recovery are towed back to KSC for refurbishment by the specially rigged recovery ships. DeepWorker 2000 was built by Nuytco Research Ltd., North Vancouver, British Columbia. It is 8.25 feet long, 5.75 feet high, and weighs 3,800 pounds. USA is a prime contractor to NASA for the Space Shuttle program

  2. KSC00pp0597

    NASA Image and Video Library

    2000-04-27

    The one-man submarine dubbed DeepWorker 2000 sits on the deck of Liberty Star, one of two KSC solid rocket booster recovery ships. The sub is being tested on its ability to duplicate the sometimes hazardous job United Space Alliance (USA) divers perform to recover the expended boosters in the ocean after a launch. The boosters splash down in an impact area about 140 miles east of Jacksonville and after recovery are towed back to KSC for refurbishment by the specially rigged recovery ships. DeepWorker 2000 was built by Nuytco Research Ltd., North Vancouver, British Columbia. It is 8.25 feet long, 5.75 feet high, and weighs 3,800 pounds. USA is a prime contractor to NASA for the Space Shuttle program

  3. KSC-00pp0597

    NASA Image and Video Library

    2000-04-27

    The one-man submarine dubbed DeepWorker 2000 sits on the deck of Liberty Star, one of two KSC solid rocket booster recovery ships. The sub is being tested on its ability to duplicate the sometimes hazardous job United Space Alliance (USA) divers perform to recover the expended boosters in the ocean after a launch. The boosters splash down in an impact area about 140 miles east of Jacksonville and after recovery are towed back to KSC for refurbishment by the specially rigged recovery ships. DeepWorker 2000 was built by Nuytco Research Ltd., North Vancouver, British Columbia. It is 8.25 feet long, 5.75 feet high, and weighs 3,800 pounds. USA is a prime contractor to NASA for the Space Shuttle program

  4. All Prime Contract Awards by State or Country, Place and Contractor. Part 10. (Abington, Massachusetts-Zeeland, Michigan)

    DTIC Science & Technology

    1989-01-01

    IOOOOON ᝰ WO) 40L L i LLJ 14 M -4 :: 347 )0( 0 ix 4(0 0.70 4z0(0) 0 0 co L(0 M00 0)L’ 00 (0.- 4 0.4 of4C 00000 IO0 00 00 00 w00 0000 0000 0’) 00 00 0000 V...82174mw-*0 N"’- -4N CO NOWO MINIM) m’,4mmw0 -400 mmC’ -4N-401U1 LA ON I 0)00 It :) C 000 If aHc CO0 a* I N. U I moo0 It IL Q M 00 (11 1 I 00- if I H4 0

  5. Prime Contract Awards Over $25,000 by Major System, Contractor and State. Part 2. (BSH-SMR)

    DTIC Science & Technology

    1989-01-01

    tI CI 4) 0 w- - 4~4 C -*. nowO )-4o -040 0 OL*l (M m 100m-1-1v-qmm 00L -t(M- 04-X 4nII W- --4Ww .nw -. 4-.M -- 4WC W-4LA -4 0QW U C W 40Ř 0-* W...L AL 0 0. J 2W -4~ 00 00L37 00 00 0U 00: 0v a0 0 04 0A < ) - 347 =N- -440 C’ ) .rN- . )-4 ~4 -4l C) M - 0 0(I) -IL.I0 Lb f 0UC0 C’ 03 U7-t0U -4N U

  6. Prime Contract Awards by State or Country, Place and Contractor. Part 8 (Newport Army Ammunition Plant, Indiana - Dorsey, Maryland), FY1991

    DTIC Science & Technology

    1991-01-01

    8217(0INC 347 0)( 4M Www (A n0 c) ()O 1a- 4AmNIl >. .44 4 N NNWW inC H (-440 44zz OZ2 ZZ czz2Z c2 cz2Z c2 cz2zzzz CZ 1. :(0 CO 102222zz * fuzz* 402222...00400 4 0 0 0 0C . D r- 0 0D 4 n1c0 IL if 0D I 40071 It 00 co g 000000 00 0 4 000 M0rm0MMC 000 04< C 00 C9ofII  If 00 ( nOWO in000000000 0(d 000

  7. All Prime Contract Awards by State or Country, Place and Contractor. Part 19. (Abbot, Virginia-Yorktown, Virginia)

    DTIC Science & Technology

    1989-01-01

    C C.CV)i 17)0 4*0 1"-ooO 0 ooOO0-0oooO0 00 1-NN W on XIIOI0 0-4 of4( NOwO (004000a . w 000) -400) 0) 0) )0) 0) 0)0(4 ) )0)0 CY ( -4 00Q WC> Co- if < 1...11 04 0-4 --- C’m 0)-4 ?.-4 0)00tMo (D C𔃾 ONN -*-* 0C’)I i W11< 347 ) 61IC-N -4NNN"NN 0-4 LO -4 4 -4 00.4-4 t-- 4 -4 -4 -4 Ni-4 -4 a) 0 011-01 <m’ t 𔃽r

  8. Prime Contract Awards by State or Country, Place and Contractor. Part 12 (Pelham Manor, New York - New Knoxville, Ohio), FY1991

    DTIC Science & Technology

    1991-01-01

    ON 3S NOWo 0. 4o 1- 0: CI (n< .4444NN --- 11.1 IS I ON4 If =0 w 0 4 40 I-40 0 20 .J00000 4 1 it I ON4 If 11.5 1- 0 1-- r IN 00 10 "-4< -14 44 0 0 .1...4 S -4--4 -4-4 -4 -4 -4 Nli-4NNMC1 * 0.4 a :2Z 2 m =z 2 Z=ZZZZ2 2 2ZZz a ( 347 ) U 4444 < 4 0 0040000000 w ɘɜ a ON C4 0000CD00 00W<M 0000a400 c0 0 2

  9. Prime Contract Awards by State or Country, Place and Contractor. Part 1 (Addison, Alabama - Mountain Pine, Arkansas), FY1991

    DTIC Science & Technology

    1991-01-01

    460oo4OOoo S03 : I (oo E a -T E4 *4 4 to- r-4 inIn canan a .-40000 .40000 00 000000 00 M0 0 1 (0(0 a 0-4 0-4 *-4 -- 4 0-1-4 .4-4..4 -1 .--- 4.4 L-4-4 -1 -4...z ZZZZ ZZ 2 Z 2 z IL 0 -0 H o CO a z zzzzz z z z z z z z z z I ivan HO1 0 40 0 0 0 0 0. o 0o H I 0-*w H ’ H ) 0-*< H3 a S c 04 0 H u00 H~ 0 QSNN NNN

  10. Fabrication methods for YF-12 wing panels for the Supersonic Cruise Aircraft Research Program

    NASA Technical Reports Server (NTRS)

    Hoffman, E. L.; Payne, L.; Carter, A. L.

    1975-01-01

    Advanced fabrication and joining processes for titanium and composite materials are being investigated by NASA to develop technology for the Supersonic Cruise Aircraft Research (SCAR) Program. With Lockheed-ADP as the prime contractor, full-scale structural panels are being designed and fabricated to replace an existing integrally stiffened shear panel on the upper wing surface of the NASA YF-12 aircraft. The program involves ground testing and Mach 3 flight testing of full-scale structural panels and laboratory testing of representative structural element specimens. Fabrication methods and test results for weldbrazed and Rohrbond titanium panels are discussed. The fabrication methods being developed for boron/aluminum, Borsic/aluminum, and graphite/polyimide panels are also presented.

  11. Dollar Summary of Prime Contract Awards by Contractor, State or Country, and Place, FY 87. Part 3. Finalco Group, Incorporated-Kennedy Electric Company.

    DTIC Science & Technology

    1987-01-01

    CO: y6)-t . I439Ct- 311 -9.I _sx3~ 9XXx ~ 3: t3 : 1911I wIl 41 l WLL wU1 .6)6WU. Ii li-I.J ... jAj .1.A.u4,J’jW O j jU. C. .J 1 .1-.1...4 -U . U to...511Wm L - 100x > .. (n OL4(AUC UI IA cc td )( I0- 4e cci5 eC 0 1- P j X3 I a . .I . -4. - 6i- -4 x 2 x . ).E x4 xx.4xx x 6LC L 0 (A I of- .. .. ~ ....43

  12. KSC-2009-2318

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. –In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, the end of the Ares I-X motor segment is removed to allow propellant grain inspection of the interior. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  13. KSC-2009-2317

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, technicians prepare to remove the cover from the end of the Ares I-X motor segment for propellant grain inspection of the interior. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  14. Prime Contractors with Awards Over $25,000 by Name, Location, and Contract Number, Fiscal Year 1992 (Transtainer System-ZZYZK)

    DTIC Science & Technology

    1993-01-01

    FFm ...EU a a- a 7- a a) axa ( 0) E acca - aaw wa w w) I ’a a w IH aCC ~~ BC).-) rJ~)D~~ 04r -. raz z n -Ha C 0 al C) aj t0- - I a O a a - a "U-u4 a ~ 0.-- a...z’aC a’a’ a G.’ -L X1a-.a- m m- W a to ~ ~ :D ’-l’ a’ f .- a.,- aCca 0 ( a ’ n -aa. ~ a-aaa-’- - Iwo -. a-a .a--a’t ~ ’a cc - - , a I. a~~J..IJ~t~aa

  15. KSC-97PC1024

    NASA Image and Video Library

    1997-07-10

    A Daimler-Benz Aerospace staff member installs thermal blanket insulation on the back cover of the Huygens probe in the Payload Hazardous Servicing Facility at KSC in July. Instruments mounted on the probe, which is owned by the European Space Agency (ESA), will receive atmospheric and surface data on Saturn’s main moon, Titan, to send back to Earth as part of the Cassini mission. The back cover, yet to be attached to the Cassini orbiter, will protect the probe during descent onto Titan. A four-year, close-up study of the Saturnian system, the mission is scheduled for launch from Cape Canaveral Air Station in October 1997. It will take seven years for the spacecraft to reach Saturn. Aerospatiale is the prime contractor for ESA

  16. All Prime Contract Awards by State or Country, Place and Contractor. Part 11. (Aitkin, Minnesota-Zephyr Cove, Nevada)

    DTIC Science & Technology

    1989-01-01

    0 )N 41 nuuu~f~01Xflininu33x33:33330I- ( 5 0 CL L . CL.CL 0ilto1 0 N 11000000000000000000000011 2 0 ) 0 ) 0 ) 0 ) 0 ) 011Z2 I00N 11 z00 000000 0000...4 4 4 4 4 4 44 IIC1 ( 0 -NOI 5 )(~ )) C)’C1: 00c ’ I 0 00 000M 00 0 0 0 00 0 0 0 0 I.I < 0 -~l 0 - 00 00 00 0000000000000000000L.I.. WU-I A 40-eN Ii~ mj X00...I m N 1(A) 04 ɜ a I-I -. Z .8 - --. 1-1 - 1--.1-.1-

  17. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place. Part 11. (Kalidescope Shipping, Inc.-Lous Electronics)

    DTIC Science & Technology

    1989-01-01

    0 ( 0 - ( 0 q I - 0 5 0 ) I WOON It -4Z r-44- 5 -N40 142 it I COC of 0I I 000 H9 is :i mo 000 111.~-D~ 0 : It -L -4 moo -4 - C I) N-4...LA 0 0 ɜif IN " 0 1- 0 2 0 LAI 0 0 1- w 1- 2 1-- 1 : I N 11 5 -4 ൾ w c-c M 1.- 0 0 c < Xf. 0 )112E I) D0 01 01 U) Q 0 ) C 0 0 -~ 0 f- i- w 11 z I) iia...8217),- N m - 0 ( 0

  18. All Prime Contract Awards by State or Country, Place, and Contractor. Part 2 (Agnew, California-Loma Linda, California)

    DTIC Science & Technology

    1990-01-01

    5 0 0 LIJ 0 >- 0 CL 0 -U. 40mI0-4 100 < WA r-’CO 4- -4 I-I L0 UO 0 ) Cf 0 0 UA 44 I -4 It 0 -* L 0 ( 0 4-4-) U (D l’- q W WW( 0 ( 0 -(D(q4( 0 4 U- 11 -4 I...w- M 0 )N HI Ln.Li.LS. 0 0 - 4 U 0 - I, 0 I cON H z00 k 22 . >- 0 -4w2 H 5 M 0000)) CC a 01-- 0 ) 2 0 Oil MICO 1114o "C0 0 - ) -1-4-4 - 20 2 54 0

  19. Grace-Fo satellites

    NASA Image and Video Library

    2017-11-09

    The Gravity Recovery and Climate Experiment Follow-on (GRACE-FO) mission is a partnership between NASA and the German Research Centre for Geosciences (GFZ). GRACE-FO is a successor to the original GRACE mission, which began orbiting Earth on March 17, 2002. GRACE-FO will carry on the extremely successful work of its predecessor while testing a new technology designed to dramatically improve the already remarkable precision of its measurement system. The GRACE missions measure variations in gravity over Earth's surface, producing a new map of the gravity field every 30 days. Thus, GRACE shows how the planet's gravity differs not only from one location to another, but also from one period of time to another. Airbus Defence and Space (Friedrichshafen/Germany) is the industrial prime contractor to build the satellites.

  20. All Prime Contract Awards by State or Country, Place, and Contractor, FY 85. Part 14 (Aberdeen, North Carolina - Zanesville, Ohio).

    DTIC Science & Technology

    1985-01-01

    I nr)MC)C) MeM V r I McI ( MV)CI MMCI C I)MC I) (( 4 N) l 1 MC)c) l< 43 I004COOOOOOOOOO)OOOOOOOOO 000 - -0 I WW C’J(WJ W’J(N C𔃾CNIC’IC’J ww C’.IC’IC’J...N)( OhP .0.( 0 <It (n0ON(0a)t- " -. I-boO( 444~~o N- WZ0n((P0~ r.-I (0 0.4 W LP n aN ODNCj)-la)In 014 NII-0000000000000000000 0 LaJo 040000 W0 4000000

  1. All Prime Contract Awards by State or Country, Place, and Contractor, FY 87. Part 22. Antigua AN-Indonesia.

    DTIC Science & Technology

    1987-01-01

    r. -4 N * I0 (4 0 0 (40 N ONO0 C,40 NN04O -4 Nl N4 N MM0C’ IN 0000 In W 0O0. ONLI LA 0) 0 0 N 0 OhP Z I (4M1 0-4 00 0 -40 -40 00 𔃾 𔃾 0 -4 0 I V w4 a...30 40 afl *00n ’ 𔃺am mem *0nI 3*( 0’(((((( C󈧄 W 03 W W to(0 Wu-M c 00 ininn tom IM IO co I I t- M0 l0 0 -4 0 𔃺 0) IoN ONCYNINNNN 0-4-4-4 ONNN N

  2. All Prime Contract Awards by State or Country, Place, and Contractor. Part 15 (Amity N. Dakota-Tulsa Oklahoma)

    DTIC Science & Technology

    1990-01-01

    m2 .m2 =~Z ZZ222* .=222* .=2222 moo 400 10 0 0- 0 0 00 0 0 OHp so 0I0moo 1.- r- .1 D 0> 00󈧬.1-N c>0In 0)(000-4-4 41) I 1 400 Y ’ 0 m’ -4 N-T 4101...0 00-4a4-4.-4-0 N 14 I 00 0) 0) 0) 0)0) 0)00) 0) MEM N1 C4 0) II 0) -4r- In r 00) Nl 0 In n Njo oo in -4 r-t-N a -4 o II I M) It -4MCMn"CNNN NOj 0 U00

  3. SIG Galileo final converter technical summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hinderman, J.D.

    1979-05-01

    The report is primarily concerned with the work performed for DOE on converter development and fabrication for the NASA Galileo Jupiter mission as a DOE prime contractor with interface primarily with Teledyne Energy Systems. The activities reported on were directed toward design, analysis and testing of modules and converters SN-1 thru SN-7 and attendant Quality Control and Reliability effort. Although assembly and testing of SN-1 was not accomplished due to the stop work order, the design was virtually completed and a significant amount of subcontracting and manufacturing of both module and converter components was underway. These subcontracting and manufacturing activitiesmore » were selectively closed down depending upon degree of completion and material or hardware potential usage in the Technology Program.« less

  4. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place. Part 13. (Michigan Power Company-Noord Natie S V)

    DTIC Science & Technology

    1989-01-01

    M-4 it 0n no ( nCAo 0 na0 0 noootioInilI r r ALLIn (no0 in-4 (n-4 Oi1lV In M0-4 11O-4 00 00 0 00- 4- 4 4- 4-4-4 -4 -4- - 41-4 -4-444-4 00 00) 0-4 liW...4 -1( a -4 -.10 j 0 0 in 00-4 1100 00. "C)0 004 Q>44Q4000 LA4 44a 0 ON "N (. "U 4110100-4 x110.4 NCAO ) 0) a (1 000N )0 00..)x.a 0.. 0 x 0(0 0( 04X

  5. All Prime Contract Awards by State or Country, Place, and Contractor, FY 84. Part 10 (Alliance, North Carolina - Woodburn, Oregon).

    DTIC Science & Technology

    1984-01-01

    Highway, Suite 120 4 Arlington, VA 22202-4302 8a. NAME OF FUNDING iSPONSORING TBb. OFFICE SYMBOL 9 . PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER...CODES 18. SUBJECT TERMS (Continue on if necessary and identity by biock number) FIELD GROUP SUB-GROUP - --- D T 1Q C% 9 ABSTRACT (Continue on reverse it...ZNNCYNNNNNNNNNcl C ci Y YNNNNNNNCY 9 ~- Z N N~ m zN C3 0). N (N NY N N NN N \\ NN N N NN N N N Nm C* . D 0 0 0 0 0 0) (D( ~0 0 CD0LL0 0 0 Q0 00 00 00 0 M W UOoO 0

  6. Prime Contract Awards Alphabetically by Contractors, by State of Country, and Place. Part 18. (Syska & Hennessy, Inc. Tube Bends incorporated)

    DTIC Science & Technology

    1989-01-01

    average I hour per response, including the time for review ng instructi o . searching exstin 9 data sources. gathering and maintaining the data needed...REPORT NUMBER ’ Arlington, VA 22202-4302 DIOR/STI8-89-PT-18 9 . SPONSORING / MONITORING AGENCY NAME(S) AND AODRESS(ES) 10. SPONSORING/ MONITORING t AGENCY...L.OID)-4 a10 4 1- 0 40 4 W-4 Wj 4 w 00 woooo W o to 10-4 ON~ )04 (n CAP o 0 Wo ()0 0- 0 0) --4 0 0 -l--4-.-4 9 --o Ol to I 0)-4 "t>0u >0 >0 >0i >00G >0

  7. KSC-2012-5819

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  8. KSC-2012-5822

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  9. KSC-2012-5824

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  10. KSC-2012-5827

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  11. KSC-2012-5826

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  12. KSC-2012-5821

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  13. KSC-2012-5820

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  14. KSC-2012-5816

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  15. KSC-2012-5825

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  16. All Prime Contract Awards by State or Country, Place and Contractor. Part 8. (Anderson, Indiana-Westwego, Louisiana)

    DTIC Science & Technology

    1989-01-01

    I000 11 -4-4.-4 -4 -14 -4 01 -I (0 .4 N N1 1- I(MOO II r- CO (00 0 9 110(0 Coc N- co-) I MM 0ooo w If 1. 103M It U/) II0 CD (0r-. 4) -01 4-4-- 4-4...0((0 I C.-4-4 c 1-4 - - c -4 C -4 -4-I-4.-1-4 .-- 4 -4I C-4 c-4-4-4-4 r--4 -4 Io I M 0U I" (00( 14 ONNc"NN O N ONNNNNNN O i rh "N N NN ON N - 1(0(0 l

  17. All Prime Contract Awards by State or Country, Place, and Contractor. Part 23 (Iceland-TRW INC Classified Location)

    DTIC Science & Technology

    1990-01-01

    0 U anoonno Q0000mnh00 C21 000 cc 00m0h00h9 103M CIO U U -4N0I H * o~ O444444N~C200 0 00 cc -4 CocoU -4000 * iaU-iNMU<: WW -4-4-4-4-4-i C404Nqf 4 -4...0 8 rH Ia. 4 0 P4 PI. 00& soG or r ,4 - . .#.- ,I.t-f .4 W-404 0 0 4 4. 4 co4 0 40a 0000000 -1- 9( 0 3co000 * In 6 344 0 40 0 a0 c 0 00>>>WA>>>>> * 0

  18. Israel: Background and U.S. Relations

    DTIC Science & Technology

    2013-11-01

    material that could be used for nuclear weapons—apparently adding to existing Israeli concerns regarding Iranian uranium enrichment. The reactor under...York, September 24, 2013. 45 Walter Russell Mead, “Threading the Needle,” blogs.the-american-interest.com, October 25, 2013. 46 Israel Prime...civil war,” haaretz.com, September 17, 2013. 59 “‘Israel will not accept deal that allows Iran to enrich uranium ,’” israelhayom.com, October 23, 2013

  19. Report of the Seasat Failure Review Board

    NASA Technical Reports Server (NTRS)

    Lundin, Bruce T.

    1978-01-01

    The Seasat spacecraft failed on October 9, 1978, after satisfactory operation in orbit for 105 days, as a result of a loss of electrical power in the Agena bus that was used as a part of the spacecraft. This loss of power was caused by a massive and progressive short in one of the slip ring assemblies that was used to connect the rotating solar arrays into the power subsystem. The most likely cause of this short was the initiation of an arc between adjacent slip ring brush assemblies. The triggering mechanism of this arc could have been either a wire-to-brush assembly contact, a brush-to-brush contact, or a momentary short caused by a contaminant that bridged internal components of opposite electrical polarity. The slip ring assembly, as used in the Seasat spacecraft, was connected into the power subsystem in such a way that most of the adjacent brush assemblies were of opposite electrical polarity. This wiring arrangement, together with the congested nature of the design itself, made the Seasat slip ring assembly a unique, first-of-a-kind component that was particularly prone to shorting. The possibility of slip ring failures resulting from placing opposite electrical polarities on adjacent brush assemblies was known at least as early-as the summer of 1977 to other projects within the contractor's organization. Furthermore, failures of slip ring assemblies due to shorting between brushes had been experienced by the prime contractor on slip ring assemblies used by other programs. That the Seasat organization was not fully aware of these potential failure modes was due to a breakdown in communication within the contractor's organization.

  20. Risk Management for the International Space Station

    NASA Technical Reports Server (NTRS)

    Sebastian, J.; Brezovic, Philip

    2002-01-01

    The International Space Station (ISS) is an extremely complex system, both technically and programmatically. The Space Station must support a wide range of payloads and missions. It must be launched in numerous launch packages and be safely assembled and operated in the harsh environment of space. It is being designed and manufactured by many organizations, including the prime contractor, Boeing, the NASA institutions, and international partners and their contractors. Finally, the ISS has multiple customers, (e.g., the Administration, Congress, users, public, international partners, etc.) with contrasting needs and constraints. It is the ISS Risk Management Office strategy to proactively and systematically manages risks to help ensure ISS Program success. ISS program follows integrated risk management process (both quantitative and qualitative) and is integrated into ISS project management. The process and tools are simple and seamless and permeate to the lowest levels (at a level where effective management can be realized) and follows the continuous risk management methodology. The risk process assesses continually what could go wrong (risks), determine which risks need to be managed, implement strategies to deal with those risks, and measure effectiveness of the implemented strategies. The process integrates all facets of risk including cost, schedule and technical aspects. Support analysis risk tools like PRA are used to support programatic decisions and assist in analyzing risks.

  1. Hanford Site Beryllium Program: Past, Present, and Future - 12428

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fisher, Mark; Garcia, Pete; Goeckner, Julie

    2012-07-01

    The U.S. Department of Energy (DOE) has a long history of beryllium use because of the element's broad application to many nuclear operations and processes. At the Hanford Site beryllium alloy was used to fabricate parts for reactors, including fuel rods for the N-Reactor during plutonium production. Because of continued confirmed cases of chronic beryllium disease (CBD), and data suggesting CBD occurs at exposures to low-level concentrations, the DOE decided to issue a rule to further protect federal and contractor workers from hazards associated with exposure to beryllium. When the beryllium rule was issued in 1999, each of the Hanfordmore » Site contractors developed a Chronic Beryllium Disease Prevention Program (CBDPP) and initial site wide beryllium inventories. A new site-wide CBDPP, applicable to all Hanford contractors, was issued in May, 2009. In the spring of 2010 the DOE Headquarters Office of Health, Safety, and Security (HSS) conducted an independent inspection to evaluate the status of implementation of the Hanford Site Chronic Beryllium Disease Prevention Program (CBDPP). The report identified four Findings and 12 cross-cutting Opportunities for Improvement (OFIs). A corrective action plan (CAP) was developed to address the Findings and crosscutting OFIs. The DOE directed affected site contractors to identify dedicated resources to participate in development of the CAP, along with involving stakeholders. The CAP included general and contractor-specific recommendations. Following initiation of actions to implement the approved CAP, it became apparent that additional definition of product deliverables was necessary to assure that expectations were adequately addressed and CAP actions could be closed. Consequently, a supplement to the original CAP was prepared and transmitted to DOE-HQ for approval. Development of the supplemental CAP was an eight month effort. From the onset a core group of CAP development members were identified to develop a mechanism for assuring that consensus was achieved on products developed as part of the CAP and the closure process. The original CAP was developed based on a large number of actions developed from the HSS report. This was essentially a 'bottoms up' approach. The revised CAP development team concluded that a more holistic, process-based approach was appropriate to assure that the resulting deliverable resulted in a best-in-class product. Consequently, issues and recommendations contained in the HSS report were grouped into 11 program areas, specific product deliverables were identified within each of the program areas, and a work breakdown structure (WBS) was logically applied to number the groupings. While the revised approach to product development utilizes a more holistic, 'top down' approach, the intent was still to incorporate specific recommendations and address specific issues contained in the HSS report. Through implementation of this new approach, a collaborative team has been established that works together using a consensus process for ensuring product completion. Benefits of the new approach include building a level of trust amongst all parties, quality of the products have improved, and acceptance by all parties of what action will truly meet the intent of the deficiency and make the beryllium program stronger. Open dialogue occurs amongst the core Be CAP team members, Hanford contractors, and DOE. It has been a learning process and will continue to be one, but everyone shares the common goal of reducing worker exposure to beryllium. (authors)« less

  2. Postirradiation thermocyclic loading of ferritic-martensitic structural materials

    NASA Astrophysics Data System (ADS)

    Belyaeva, L.; Orychtchenko, A.; Petersen, C.; Rybin, V.

    Thermonuclear fusion reactors of the Tokamak-type will be unique power engineering plants to operate in thermocyclic mode only. Ferritic-martensitic stainless steels are prime candidate structural materials for test blankets of the ITER fusion reactor. Beyond the radiation damage, thermomechanical cyclic loading is considered as the most detrimental lifetime limiting phenomenon for the above structure. With a Russian and a German facility for thermal fatigue testing of neutron irradiated materials a cooperation has been undertaken. Ampule devices to irradiate specimens for postirradiation thermal fatigue tests have been developed by the Russian partner. The irradiation of these ampule devices loaded with specimens of ferritic-martensitic steels, like the European MANET-II, the Russian 05K12N2M and the Japanese Low Activation Material F82H-mod, in a WWR-M-type reactor just started. A description of the irradiation facility, the qualification of the ampule device and the modification of the German thermal fatigue facility will be presented.

  3. Performance specifications: the nearly impossible versus the merely difficult

    NASA Astrophysics Data System (ADS)

    Hopper, Darrel G.

    2000-08-01

    Affordability is the objective of acquisition reform. The institution of 'performance' specifications in lieu of 'design' specifications is a key strategy. Design of a cockpit display, for example, is left to the prime contractor based on a performance requirement stated by the government. The prime delegates to the integrator. The integrator develops the display and bill of materials provided by vendors. There is no feedback loop from the vendors to the ultimate customer, the government. As a result of this situation a communication gap exists: the government, primes, and integrators have concluded that they should pay commodity prices for custom displays. One step in the closing of this gap is the establishment of cross- cutting common reference performance specifications for aerospace and defense displays. The performance specification for cockpit displays is nearly impossible to achieve -- the last ounce of technology and more is required. Commodity markets, such as consumer notebook computers, are based on but a fraction of currently available technology -- companies 'bank' technology and roll it out across several 18-month product generations. Ruggedized consumer displays can be used in aerospace and defense applications other than the cockpit, such as mission crew stations. The performance specification for non-cockpit aerospace and defense applications is merely difficult. Acquisition reform has been defined by the Secretary of Defense to mean DoD should leverage the commercial market to the maximal extent possible. For the achievement of this end, an entirely different approach is wanted for cockpit displays versus large platform mission displays. That is, the nearly impossible requires a different design and business approach from the merely difficult.

  4. NASA-NIAC 2001 Phase I Research Grant on Aneutronic Fusion Spacecraft Architecture

    NASA Technical Reports Server (NTRS)

    Tarditi, Alfonso G. (Principal Investigator); Scott, John H.; Miley, George H.

    2012-01-01

    This study was developed because the recognized need of defining of a new spacecraft architecture suitable for aneutronic fusion and featuring game-changing space travel capabilities. The core of this architecture is the definition of a new kind of fusion-based space propulsion system. This research is not about exploring a new fusion energy concept, it actually assumes the availability of an aneutronic fusion energy reactor. The focus is on providing the best (most efficient) utilization of fusion energy for propulsion purposes. The rationale is that without a proper architecture design even the utilization of a fusion reactor as a prime energy source for spacecraft propulsion is not going to provide the required performances for achieving a substantial change of current space travel capabilities.

  5. Strange bedfellows: The curious case of STAR and Moata

    NASA Astrophysics Data System (ADS)

    Smith, A. M.; Levchenko, V. A.; Malone, G.

    2013-01-01

    The 2 MV tandem accelerator named ‘STAR’ was installed at ANSTO in 2003 and commissioned in 2004. It is used for ion beam analysis (IBA) and for radiocarbon measurements by accelerator mass spectrometry (AMS). Convenient space for the accelerator was found in the same building occupied by the decommissioned Argonaut-class nuclear reactor ‘Moata’; the name derives from the aboriginal word for ‘fire stick’ or ‘gentle fire’, appropriate for a 100 kW research reactor. This reactor operated between 1961 and 1995. In 2007 ANSTO’s Engineering Division assembled a team to dismantle and remove the reactor structure, along with its 12.1 tonnes of graphite reflector. The removal and remediation was completed in November 2010 and has won the team a number of prestigious awards. The entire operation was conducted inside a negatively-pressurised double-walled vinyl tent. An air curtain was positioned around the reactor core. The exhaust air from the tent passed through 2-stage HEPA filters before venting through an external stack. Neither ANSTO staff nor contractors received any significant radiation dose during the operation. Given the sensitivity of STAR for detection of 14C/12C (∼10-16) and the numerous routes for production of 14C in the reactor such as 13C(n, γ)14C, 14N(n, p)14C and 17O(n, α)14C there was the potential to directly contaminate the STAR environment with 14C. Furthermore, there was concern that reactor-14C could find its way from this building into the building where the radiocarbon sample preparation laboratories are located. This necessitated restrictions on staff movement between the buildings. We report on 14C control measurements made during and after the operation. These involved direct measurements on the reactor graphite and concrete bioshield, blank targets that were exposed in the building, swipe samples taken inside the tent and around the building and aerosol samples that were collected inside the building throughout the operation.

  6. Development of PRIME for irradiation performance analysis of U-Mo/Al dispersion fuel

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jeong, Gwan Yoon; Kim, Yeon Soo; Jeong, Yong Jin

    A prediction code for the thermo-mechanical performance of research reactor fuel (PRIME) has been developed with the implementation of developed models to analyze the irradiation behavior of U-Mo dispersion fuel. The code is capable of predicting the two-dimensional thermal and mechanical performance of U-Mo dispersion fuel during irradiation. A finite element method was employed to solve the governing equations for thermal and mechanical equilibria. Temperature-and burnup-dependent material properties of the fuel meat constituents and cladding were used. The numerical solution schemes in PRIME were verified by benchmarking solutions obtained using a commercial finite element analysis program (ABAQUS).The code was validatedmore » using irradiation data from RERTR, HAMP-1, and E-FUTURE tests. The measured irradiation data used in the validation were IL thickness, volume fractions of fuel meat constituents for the thermal analysis, and profiles of the plate thickness changes and fuel meat swelling for the mechanical analysis. The prediction results were in good agreement with the measurement data for both thermal and mechanical analyses, confirming the validity of the code. (c) 2018 Elsevier B.V. All rights reserved.« less

  7. All Prime Contract Awards by State or Country, Place and Contractor. Part 3. (Lemon Grove, California-San Bruno, California)

    DTIC Science & Technology

    1989-01-01

    NNJ Ql B 0- 4yo if 0(( 4 I 0. -4 (71 11 I 0-400M1U c) M-0(1 0 00c 0 0> 0 00 00Q 00 000 Q II -40041 0> 00 0 0> 0 00 c 00 00 00 0 0 O--1NA it N NNP, N N...a oil I Cc01 l4 4 02 I-4 4 04 wt l i 4V oil I -4cO’ it 0 co n 4. N -4 Qs 0 00 m 0r 4Yo -,C4-ti 0J11 41(< m 1100-4 4a’ C-000 - ON0 (1-0 * 0 -4 4(0 C4

  8. United Space Alliance waits to test its one-man submarine for SRB retrieval

    NASA Technical Reports Server (NTRS)

    2000-01-01

    The one-man submarine dubbed DeepWorker 2000 sits on the deck of Liberty Star, one of two KSC solid rocket booster recovery ships. The sub is being tested on its ability to duplicate the sometimes hazardous job United Space Alliance (USA) divers perform to recover the expended boosters in the ocean after a launch. The boosters splash down in an impact area about 140 miles east of Jacksonville and after recovery are towed back to KSC for refurbishment by the specially rigged recovery ships. DeepWorker 2000 was built by Nuytco Research Ltd., North Vancouver, British Columbia. It is 8.25 feet long, 5.75 feet high, and weighs 3,800 pounds. USA is a prime contractor to NASA for the Space Shuttle program.

  9. Software Engineering for Human Spaceflight

    NASA Technical Reports Server (NTRS)

    Fredrickson, Steven E.

    2014-01-01

    The Spacecraft Software Engineering Branch of NASA Johnson Space Center (JSC) provides world-class products, leadership, and technical expertise in software engineering, processes, technology, and systems management for human spaceflight. The branch contributes to major NASA programs (e.g. ISS, MPCV/Orion) with in-house software development and prime contractor oversight, and maintains the JSC Engineering Directorate CMMI rating for flight software development. Software engineering teams work with hardware developers, mission planners, and system operators to integrate flight vehicles, habitats, robotics, and other spacecraft elements. They seek to infuse automation and autonomy into missions, and apply new technologies to flight processor and computational architectures. This presentation will provide an overview of key software-related projects, software methodologies and tools, and technology pursuits of interest to the JSC Spacecraft Software Engineering Branch.

  10. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place. Part 2 (Allied Supply Co Inc-Ashley Machine & Tool Co)

    DTIC Science & Technology

    1990-01-01

    I M1.-NII 0i0 0 0Q 00 0 0000000 0 UrO I 00..4N0 it 0> 00 0> 0> 00DC 4 > 0a(0 0 000000000 0 U 0)-4N KfC 0 00 0 00C 00 00000000 00 000 0 a m -4N0 C1 M...0 IN In 1 1( II< 00 o0 oCUo)_ In Infin nIn 00Co00> 0 Olin in CL if - I Cow< I CI0) 0CC 00 4n R ’D 0 NI N N oIn In inin in 0> -4r-- cn WIf 0 1C o i

  11. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, FY 88. Part 9. (Giusti & Renshaw Construction-Hitachi America, Ltd.)

    DTIC Science & Technology

    1988-01-01

    0000000000000-4-4 00 C-0 C- 0 0 Mol040 9L0 I c0N IW00000000110N00O X"- wo Ci 0 izo-4 ( 0KI o WI(0ON 0 0 C4 C-C-C-C-C-C-C-L9CC-0 C-I.- OC- 0 C-LI 0001...I r- r- rl r- r- o to V -* q1t v -4 -9t -4 Ln Ln Ln Ln 0 1 wotn< I N N C,4 N -4 Ln Ln -4 V 14 -4 -4 -4 00 Lf) U) Ul) Ln I CO a c) 1 -4 04 0) -e 0) tD

  12. Prime Contract Awards Alphabetically by Contractor, by State or Country, and Place, Fiscal Year 1985. Part 6 (Delaco Supreme Tool & Gear Inc - Electronic Measurements Inc).

    DTIC Science & Technology

    1985-01-01

    itt0D()cu o L CJ L 4P -mo rM1 00 tD )0) 44D um acWnr * t L nŘrm- 40) Ia 4 "NNNN.O Z-4 to 0 WA4 q 4 -4 )) m q 4 Ln M )A(ONc to0 -04 0 0000-4 20 Nl...00000004441 -Q 00 0 0 C9 1 -00000 i wmV-w-w 110qf 0i 04 04C, : 0 wM WO OI * I 00001 - Xi in - X:00 1 .4zI-4o 0 ~ ~ ~ C -4 Q00 Il .I-1 r’.-C 0)) 0kI -- V~I~ El

  13. All Prime Contract Awards by State or Country, Place, and Contractor, FY 84. Part 13 (Abingdon, Virginia - F. E. Warren AFB, Wyoming).

    DTIC Science & Technology

    1984-01-01

    43 ** 0 4c 3 CL .C. UUUUUUUUUUUUUUUUUUUUUU)))))))))))))))))))))))))U ,0-< ian 0000000000000000000000000000000000000000000000 0 NO *I , 0’-I)I N--NNN...N ---- ---- N I OD 𔃺 -C (D OII IA IAN CY CCOCO I C N(l!Co- i ID if); 0.- - -- - -.-.-- 0 -.-.-- 0 𔃺 0’ 0-. m o-- 0- 1 1 l) 0-MC)C)0 0 0 r-I iC l...r-- - r l- r - - - r- - 𔃺 NI A N N IN N It IAN Ii NNN N. N IN 𔃺 CD’ ---- -~ -YCjN - N NN(’! -l mC YciC Ck 𔃺 0 0 0 0 0 L) ’N; N N :3 Z)N D N N7 N7

  14. KSC-2012-5823

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – U.S. Rep. Bill Posey R-Rockledge, right, speaks with an exhibitor participating NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  15. All Prime Contract Awards by State or Country, Place and Contractor. Part 2. (Acampo, California-Lawndale, California)

    DTIC Science & Technology

    1989-01-01

    Il 1N 10)0 CO 0 40 1)--4 00 1)O(C 1-0 0)0" .41-1N 1110 I N 1 -4 40 ~0 1-0 INa IeC ( ’ 11IiI- ii* 0O CO 0 0 COl 0 0 4 CO cl 0i W 0)w>O I’ OC) 0.*t 0...0 .l 4 00 Q? 4 0II114I10-4 It 00) 0 4 4< ZOO zo 0) 1-44* 0 V, -4’ oo002" <I(0 1-4 cc-1 000) UJ9- I, WN Id0 1-4-4 0 9- 61010 .- ’CO 0 In4 1-1 40 WO

  16. JWST Full-Scale Model on Display at Goddard Space Flight Center

    NASA Image and Video Library

    2010-02-26

    JWST Full-Scale Model on Display. A full-scale model of the James Webb Space Telescope was built by the prime contractor, Northrop Grumman, to provide a better understanding of the size, scale and complexity of this satellite. The model is constructed mainly of aluminum and steel, weighs 12,000 lb., and is approximately 80 feet long, 40 feet wide and 40 feet tall. The model requires 2 trucks to ship it and assembly takes a crew of 12 approximately four days. This model has travelled to a few sites since 2005. The photographs below were taken at some of its destinations. The model is pictured here in Greenbelt, MD at the NASA Goddard Space Flight Center. Credit: NASA/Goddard Space Flight Center/Pat Izzo

  17. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idahomore » Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”« less

  18. All Prime Contract Awards by State or Country, Place, and Contractor, FY 88. Part 13. (Akron, New York-Yorktown Heights, New York).

    DTIC Science & Technology

    1988-01-01

    4 4 -4 --4 -A4 - -4 -4, 4 .4 06-4 0.-4 .1 I.- I MOLA (0 I 0.41W 06(.4 CD(004c co to(D(DcOc(0cOc4 Q(CD40C040(DC o ( 0 t 0C 000(0 WD4 0.1( ( G I MOLII0...o 001- I VW4 -W"WN NWO) W 0 0(1- -4 0-7 0)CNI-0 0 CO w I Mor- I - N m0 -4 -4 -1 M0 N i I 0o- I- 1(00 - I 1 0001 --. 1𔃺 0 0 0 0 0 0 0 0 0 MOLA (0 I 3

  19. KSC-00pp0598

    NASA Image and Video Library

    2000-04-27

    The one-man submarine dubbed DeepWorker 2000 sits on the deck of Liberty Star, one of two KSC solid rocket booster recovery ships. Inside the sub is the pilot, Anker Rasmussen. The sub is being tested on its ability to duplicate the sometimes hazardous job United Space Alliance (USA) divers perform to recover the expended boosters in the ocean after a launch. The boosters splash down in an impact area about 140 miles east of Jacksonville and after recovery are towed back to KSC for refurbishment by the specially rigged recovery ships. DeepWorker 2000 was built by Nuytco Research Ltd., North Vancouver, British Columbia. It is 8.25 feet long, 5.75 feet high, and weighs 3,800 pounds. USA is a prime contractor to NASA for the Space Shuttle program

  20. KSC00pp0598

    NASA Image and Video Library

    2000-04-27

    The one-man submarine dubbed DeepWorker 2000 sits on the deck of Liberty Star, one of two KSC solid rocket booster recovery ships. Inside the sub is the pilot, Anker Rasmussen. The sub is being tested on its ability to duplicate the sometimes hazardous job United Space Alliance (USA) divers perform to recover the expended boosters in the ocean after a launch. The boosters splash down in an impact area about 140 miles east of Jacksonville and after recovery are towed back to KSC for refurbishment by the specially rigged recovery ships. DeepWorker 2000 was built by Nuytco Research Ltd., North Vancouver, British Columbia. It is 8.25 feet long, 5.75 feet high, and weighs 3,800 pounds. USA is a prime contractor to NASA for the Space Shuttle program

Top