Science.gov

Sample records for records management plan

  1. 77 FR 12877 - Record of Decision for the General Management Plan/Abbreviated Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... National Park Service Record of Decision for the General Management Plan/Abbreviated Final Environmental... Management Plan for New River Gorge National River, West Virginia. The Record of Decision selects the approved general management plan for New River Gorge National River for the next 15 to 20 years....

  2. 75 FR 10308 - Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand Canyon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... National Park Service Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand... Availability of a Record of Decision on the Final Environmental Impact Statement for the Fire Management Plan.... 4332(2)(C), the National Park Service announces the availability of the Record of Decision for the...

  3. 77 FR 66865 - Record of Decision for the Oil and Gas Management Plan, Big South Fork National River and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-07

    ... National Park Service Record of Decision for the Oil and Gas Management Plan, Big South Fork National River... (ROD) for the Oil and Gas Management Plan (Plan) for Big South Fork National River and Recreation Area... impacts from oil and gas development. The plan will guide oil and gas management in Big South...

  4. Transit management and replacement capital planning. Transportation research record

    SciTech Connect

    Not Available

    1988-01-01

    The 15 papers in this report deal with the following areas: planning priorities for replacement of transit assets; establishing a transit capital replacement account - the San Diego experience; use of life-cycle cost analysis in transit capital overhaul/replace decisions - an application to the PATH railcar fleet; methodology for projecting rail transit rehabilitation and replacement-capital financing needs; long-range transit fleet planning: defining and costing a replacement-only scenario for Seattle; strategic planning as a basis for capital-investment programming: case study of the regional transportation authority in Chicago; trolley bus and motor-coach operational cost comparisons utilizing section 15 data; strategic model for operator work-force planning in the transit industry; monitoring performance of new bus routes; optimization strategies for transit systems in urban corridors; data processing software for an automatic data-acquisition system in mass transit; determinants of superior performance in public transit: research opportunities using Section 15 data; life-cycle cost analysis of electronic registering fareboxes: a case study; cluster-sampling techniques for estimating transit patronage; recent changes in BART patronage: some findings on fare elasticities.

  5. 75 FR 79389 - Notice of Availability of the Record of Decision for the General Management Plan/Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... the decision-making process. The approved General Management Plan will guide long-term management of... National Park Service Notice of Availability of the Record of Decision for the General Management Plan... of Decision for the General Management Plan/Environmental Impact Statement (GMP/ EIS) for...

  6. 76 FR 5820 - Record of Decision for the General Management Plan for the Cumberland Gap National Historical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-02

    ... National Park Service Record of Decision for the General Management Plan for the Cumberland Gap National... the Record of Decision for the General Management Plan Environmental Impact Statement for the Cumberland Gap National Historical Park. SUMMARY: Pursuant to the National Environmental Policy Act of...

  7. 77 FR 54922 - Record of Decision for the General Management Plan/Final Environmental Impact Statement, Hampton...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-06

    ... National Park Service Record of Decision for the General Management Plan/Final Environmental Impact... Region signed the Record of Decision selecting Alternative 3 as the approved General Management Plan (GMP... measures to minimize environmental harm, and an overview of public involvement in the...

  8. 77 FR 31036 - Notice of Availability of the Record of Decision for the Taos Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... Bureau of Land Management Notice of Availability of the Record of Decision for the Taos Resource... availability. SUMMARY: The Bureau of Land Management (BLM) announces the availability of the Record of Decision... plan completed in 1988, provides updated management decisions regarding land tenure adjustments,...

  9. 77 FR 20843 - Record of Decision for the Nabesna Off-Road Vehicle Management Plan and Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ... National Park Service Record of Decision for the Nabesna Off-Road Vehicle Management Plan and Final..., Interior. ACTION: Notice of availability of a record of decision for the Nabesna Off-Road Vehicle... documents decisions regarding off-road vehicle management in the Nabesna District of Wrangell-St....

  10. SMART Plan. Statewide Management of Automated Record Transfer: A Plan To Automate and Transfer Student Records Statewide.

    ERIC Educational Resources Information Center

    Nevada State Dept. of Education, Carson City. Planning, Research and Evaluation Branch.

    As of 1993, Nevada had no systems for statewide automation and transfer of student records. This guide book presents findings of a collaborative study, conducted by the Nevada Department of Education and local school districts, that explored the need for and feasibility of developing a statewide system for automating and transferring student…

  11. 75 FR 30426 - Notice of Availability of Record of Decision for the Kemmerer Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... (ROD)/Approved Resource Management Plan (RMP) for the Kemmerer Field Office planning area located in... (307) 828-4500; or e-mail John_Christensen@blm.gov and Michelle_Easley@blm.gov , respectively..., county governments, other Federal agencies, and tribal governments. The Kemmerer RMP planning...

  12. 78 FR 76855 - Record of Decision for the General Management Plan/Wilderness Study, Fort Pulaski National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-19

    ...Pursuant to the National Environmental Policy Act of 1969, 42 U.S.C. 4332(2)(C), the National Park Service (NPS) announces the availability of the Record of Decision (ROD) for the General Management Plan/Wilderness Study (GMP/WS) for Fort Pulaski National Monument (national monument). On September 30, 2013, the Regional Director, Southeast Region, approved the ROD for the...

  13. Energy planning and management plan

    SciTech Connect

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

  14. Golden eagle records from the Midwinter Bald Eagle Survey: information for wind energy management and planning

    USGS Publications Warehouse

    Eakle, Wade; Haggerty, Patti; Fuller, Mark; Phillips, Susan L.

    2013-01-01

    The purpose of this Data Series report is to provide the occasions, locations, and counts when golden eagles were recorded during the annual Midwinter Bald Eagle Surveys. Golden eagles (Aquila chrysaetos) are protected by Federal statutes including the Bald and Golden Eagle Protection Act (BGEPA) (16 USC 668-668c) and the Migratory Bird Treaty Act (MBTA) (16 USC 703-12). The U.S. Fish and Wildlife Service (Service) manages golden eagles with the goal of maintaining stable or increasing breeding populations (U.S. Fish and Wildlife Service, 2009). Development for the generation of electricity from wind turbines is occurring in much of the range of the golden eagle in the western United States. Development could threaten population stability because golden eagles might be disturbed by construction and operation of facilities and they are vulnerable to mortality from collisions with wind turbines (Smallwood and Thelander, 2008). Therefore, the Service has proposed a process by which wind energy developers can collect information that could lead to Eagle Conservation Plans (ECP), mitigation, and permitting that allow for golden eagle management in areas of wind energy development (U.S. Fish and Wildlife Service, 2011). The Service recommends that ECP be developed in stages, and the first stage is to learn if golden eagles occur at the landscape level where potential wind facilities might be located. Information about where eagles occur can be obtained from technical literature, agency files, and other sources of information including on-line biological databases. The broad North American distribution of golden eagles is known, but there is a paucity of readily available information about intermediate geographic scales and site-specific scales, especially during the winter season (Kochert and others, 2002).

  15. Action Planning and Recording Achievement.

    ERIC Educational Resources Information Center

    Green, Muriel

    This document examines strategies and procedures that British further education (FE) colleges can use to develop and enhance systems and structures for guiding and supporting learners and learning. It is based on the findings of a field test of the Managing Learning model for planning and recording the process of FE students. First, the importance…

  16. Care planning as a strategy to manage variation in practice: from care plan to integrated person-based record.

    PubMed

    Hoy, J D; Hyslop, A Q

    1995-01-01

    This article begins with a summary of the trend toward a person-based health record, and the need to integrate data from a variety of sources to achieve this. A project is described that demonstrated problems with the structure of nursing care plans. These problems affected the ability to integrate care plan data into a clinical database capable of analysis to link control of process with clinical outcome. A second project is described that focused on the development of data sets holding higher-level descriptions suitable for the maintenance of a person-based record, but at a summarized level and with no clinical detail. Finally, a prototype care planning system is described that, while maintaining the data required by the Nursing Process, was more flexibly structured to support analysis and hierarchical levels of description. PMID:7583650

  17. 75 FR 38832 - Record of Decision for the General Management Plan for the Chattahoochee River National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    ... National Recreation Area, GA AGENCY: National Park Service, Department of the Interior. ACTION: Notice of... Chattahoochee River National Recreation Area. SUMMARY: Pursuant to the National Environmental Policy Act of 1969... Decision (ROD) for the General Management Plan, Chattahoochee River National Recreation Area, Georgia....

  18. Principal Challenges Facing Electronic Records Management in Federal Agencies Today.

    ERIC Educational Resources Information Center

    Patterson, Giovanna; Sprehe, J. Timothy

    2002-01-01

    Discusses electronic records management in the federal government. Highlights include managing electronic mail; information technology planning, systems design, and architecture; updating conventional records management; integrating electronic records management with other information technology systems; challenges of end-user training; business…

  19. Records Management Manual.

    ERIC Educational Resources Information Center

    Alaska State Dept. of Education, Juneau. State Archives and Records Management.

    This manual, prepared primarily for state government agencies, describes the organization and management of Alaska government records. Information is presented in nine topic areas: (1) Alaska's Archives and Records Management Program, which describes the program, its mission, services available, and employee responsibilities; (2) Records in…

  20. UMTRA Project Administrative Files Collection Records Management Program

    SciTech Connect

    Not Available

    1994-09-01

    The UPAFC Records Management Plan is based on the life cycle of a record - the evolution of a record from creation until final disposition. There are three major phases in the life cycle of a record: (1) creation and receipt, (2) maintenance and use, and (3) disposition. Accordingly, the Records Management Plan is structured to follow each of those phases. During each of the three phases, some kind of control is mandatory. The Records Management Plan establishes appropriate standards, policies, and procedures to ensure adequate control is always maintained. It includes a plan for records management, a plan for records management training activities, and a plan for auditing and appraising the program.

  1. Public transportation 1995: Current research in planning, management, technology, and ridesharing. Transportation research record

    SciTech Connect

    1995-12-31

    ;Partial Contents: Long-Range Planning Issues for Small Transit Agencies; Methods and Strategies for Transit Benefit Measurement; Relationships Between Public Transport Finance and National Economy in The Netherlands; Modifying Transit Mode Share in Household Survey Expansion; Measuring Impacts of Transit Financing Policy in Geopolitical Context: Montreal Case; Perspective on Maglev Transit and Introduction of Personal Rapid Transit Maglev; Profile of Employee Transportation Coordinators; Demographics of Carpooling; Carpooling with Co-workers in Los Angeles: Employer Involvement Does Make a Difference; Stated Choice-Based Performance Evaluation of Selected Transportation Control Measures and Their Transfer Across Sites; and Five-Year Results of Employee Commute Options in Southern California.

  2. 75 FR 4842 - Notice of Availability of Record of Decision for the Yuma Field Office Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ... the ROD/Approved Plan include the recalculation of Geographic Information System acreage to ensure....html . FOR FURTHER INFORMATION CONTACT: James T. Shoaff, Field Manager, Bureau of Land Management, Yuma Field Office, 2555 Gila Ridge Road, Yuma, Arizona 85365. SUPPLEMENTARY INFORMATION: One of...

  3. Certified records manager exam

    SciTech Connect

    Not Available

    1990-01-01

    The Institute of Certified Records Managers (ICRM) is a non-profit, certifying organization of professional records managers and administrators. ICRM members are experienced in information requirements, records and information systems, and the related office systems and technologies. All members have met certification requirements and have received the Certified Records Manager (CRM) designation. As the field of information and records management moves toward standardization, and as the application of new technologies and technicalities complicate the measurement and demonstration of professional competence, the need for a means of identifying persons who have basic competency increases. The ICRM is providing such a means by testing and certifying basic knowledge. More and more job announcements are requiring this evidence of competency. Unfortunately, as an organization, NIRMA has a relatively small number of CRMs. The goal of the ICRM Development Group is two-fold; (1) to encourage NIRMA members to obtain their certification by providing basic information and support and; (2) to develop the Nuclear Specialist test module which will demonstrate that bearers have demonstrated expertise in nuclear records management as well as basic competencies. This report covers the examination process.

  4. Energy Management Plan.

    ERIC Educational Resources Information Center

    Tasmania Dept. of Education, Hobart (Australia). Facilities Services Section.

    This report presents an overview of the energy management plan for Tasmanian schools designed to minimize the costs of all forms of energy usage within these facilities. The policy and objectives of the plan are provided along with details of the plan itself and its current status. Appendices contain an extract from Asset Management Plan for Real…

  5. 36 CFR 219.31 - Maintenance of the plan and planning records.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Planning Documentation § 219.31 Maintenance of the plan and planning records. (a) Each National Forest or Grassland Supervisor... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Maintenance of the plan...

  6. ICDF Complex Operations Waste Management Plan

    SciTech Connect

    W.M. Heileson

    2006-12-01

    This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

  7. Office of Legacy Management. Information and Records Management. Transition Guidance

    SciTech Connect

    2004-03-01

    information responsibilities. The DOE Office of the Chief Information Officer (OCIO) has a central role in DOE records management by providing guidance, expertise, and coordination to all DOE offices and organizations and coordination with the National Archives and Records Administration (NARA). LM and the transfer site will complete an integrated transition plan which will integrate all transition elements including information and records. As part of the overall transition plan, an Information and Records Transition Plan will be developed consistent with the integrated transition plan for the site transfer and included as an attachment. The Information and Records Management Transition Plan will be developed to assist both organizations in organizing the tasks; establishing a timetable and milestones for their completion; and identifying manpower, funding and other resources that will be needed to complete the ownership transfer. In addition, the plan will provide a valuable exchange of institutional knowledge that will assist LM in meeting the obligations of responsibly managing legacy records. Guidance for the development of the plan is included in this document. Records management concerns that may arise during site closure, such as management support, contract language and agreements, interactions with the OCIO and NARA, resource and budget considerations, and procedures to safeguard records are addressed. Guidelines and criteria for records management transition activities are also provided. These include LM expectations for the inventory, scheduling, and disposition of records; the management and transfer of electronic files, including databases and software; records finding aids, indices, and recordkeeping systems; and the process for the transfer of hard copy and electronic records to LM.

  8. Records management modernization study

    SciTech Connect

    Kadec, S.; Hill, L.G.; Riemer, C.A.

    1989-12-01

    The Department of Veterans Affairs (VA) has a single purpose or mission: to provide benefits to the veterans of the nation. Most of these benefits are provided through its medical and health facilities located around the country: the hospitals, nursing homes, and clinics that give medical examinations and provide long-term care or hospitalization. A second sizeable program managed by the Veterans Benefit Administration (VBA) gives pensions, benefits for disability and education, insurance, and home loans to those veterans eligible under law and specific service conditions. In support of the benefits programs, VA staff in the regional offices (ROs) receive and create a large amount of documentation. This documentation supports the award or disallowance of benefits by providing the information necessary to determine eligibility and the amount of the award. This paperwork, which is necessary to document actions and support the appeals process, creates a huge record-keeping problem for the ROs. 6 tabs.

  9. 3 CFR - Managing Government Records

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... records, including email and social media, deploying cloud-based services or storage solutions, and... 3 The President 1 2012-01-01 2012-01-01 false Managing Government Records Presidential Documents Other Presidential Documents Memorandum of November 28, 2011 Managing Government Records Memorandum...

  10. Systems engineering management plans.

    SciTech Connect

    Rodriguez, Tamara S.

    2009-10-01

    The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

  11. Report of the Tape Recorder Action Plan Committee, 21 March 1972

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A NASA/AF Tape Recorder Action Plan Committee was formed in January 1972 to investigate tape recorder problems and to recommend an action plan to NASA management. The committee collected data on tape recorder failure history, pinpointed problem areas, discussed needed technical and management changes, and proposed an action plan for the recommended approaches.

  12. Management self assessment plan

    SciTech Connect

    Debban, B.L.

    1998-01-30

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.

  13. 78 FR 24232 - Record of Decision for the Denali Park Road Final Vehicle Management Plan and Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... plan/environmental impact statement was published in the Federal Register on August 1, 2011 (FR 45848... final plan/environmental impact statement was published in the Federal Register on July 29, 2012 (FR..., the environmentally preferable alternative, measures adopted to minimize environmental harm,...

  14. 76 FR 64100 - Notice of Availability of Record of Decision for the Little Snake Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... quality. Several areas formerly managed as ACECs are not designated as ACECs in the ROD because they were... and important values in these areas. The ROD outlines management actions to protect wilderness... Little Yampa Canyon. The management objectives for these areas would be to protect...

  15. Plutonium Vulnerability Management Plan

    SciTech Connect

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  16. Technology and Educational Buildings and Records for Management of Buildings. School Buildings Planning, Design, and Construction Series No. 7.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on how educational buildings should be designed to permit technological change with efficiency and minimum expense. Issues examined…

  17. 75 FR 53980 - Notice of Availability of the Record of Decision; Elk Management Plan/Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-02

    ... Plan in order to maintain a consistent population level. Following each year of the initial reduction phase, the NPS will evaluate the program in order to determine if its population goals are being met. If population goals are being achieved, the park will continue with the use of firearms. Should the...

  18. Risk Management Plan

    SciTech Connect

    G. R. Stephenson

    2001-12-01

    The purpose of this Risk Management Plan (RMP) is to establish the concept and define the process to assure that National Nuclear Security Administration Nevada Operations Office Environmental Management (NNSA/NV EM) programs and projects incorporate appropriate, efficient, cost-effective measures to mitigate the impact of program-and/or project-related risks. In addition, it describes the roles and responsibilities of program personnel in performing the risk management functions, and defines reporting and tracking requirements for risk-related information. The product of this risk analysis will be a risk analysis report listing the various risks with their classification, mitigation and handling strategies, impact on cost and schedule, and action items. The risk management process will identify potential risk sources; assess individual risks and impacts on performance, cost, and schedule; evaluate alternative approaches to mitigate high and moderate risks; develop action plans to handle individual risks; and interface risks with other programs and/or projects. Risk management and risk assessment will be consistent with DOE Orders 430.1 and 413.3 and their associated guidance documentation. The RMP will remain valid for the life cycle of the program and/or projects and will be under configuration control with revisions to be conducted as required and approved.

  19. Medical waste management plan.

    SciTech Connect

    Lane, Todd W.; VanderNoot, Victoria A.

    2004-12-01

    This plan describes the process for managing research generated medical waste at Sandia National Laboratories/California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of medical waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to medical waste.

  20. Biohazardous waste management plan.

    SciTech Connect

    Lane, Todd W.

    2004-01-01

    This plan describes the process for managing non-medical biohazardous waste at Sandia National Laboratories California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of biohazardous waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to non-medical biohazardous waste.

  1. Strategic Planning and Financial Management

    ERIC Educational Resources Information Center

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  2. Record Management and Design Reuse

    NASA Technical Reports Server (NTRS)

    Briggs, Hugh C.

    2008-01-01

    Government mandated records management requirements apply to retention and long term archival of a wide variety of records. Part of the attention is on permanent accession and retention by the U.S. National Archives and Records Administration (NARA) but interim requirements for storage by the source agency are included. As government agencies and the Department of Defense move toward implementations, additional goals often include saving design data for reuse. This paper briefly reviews the government records management requirements then investigates candidate meanings of 'reuse' and proposes an enhanced design records retention approach. The recommended strategy that emerges is, for a given program or product family, to invest in rich and readily re-executable preservation of design artifacts for one or two subsequent generations, then downgrade the data in utility through conversions, ultimately reaching the NARA minimum standard for permanent historical-interest archives.

  3. 31. RECORD PLAN, METROPOLITAN SEWER, GENERAL PLAN OF PUMPING STATION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. RECORD PLAN, METROPOLITAN SEWER, GENERAL PLAN OF PUMPING STATION GROUNDS, DEER ISLAND. METROPOLITAN SEWERAGE COMMISSION, JUNE 1896. Photocopy of image of aperture card 4977-1. Aperture cards and original drawings at Massachusetts Water Resources Authority Archives, Building 39, Charlestown Navy Yard, Boston, MA - Deer Island Pumping Station, Boston, Suffolk County, MA

  4. Environmental Management System Plan

    SciTech Connect

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These

  5. Project Management Plan

    SciTech Connect

    Not Available

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

  6. 1993 Department of Energy Records Management Conference

    SciTech Connect

    1993-12-31

    This document consists of viewgraphs from the presentations at the conference. Topics included are: DOE records management overview, NIRMA and ARMA resources, NARA records management training, potential quality assurance records, filing systems, organizing and indexing technical records, DOE-HQ initiatives, IRM reviews, status of epidemiologic inventory, disposition of records and personal papers, inactive records storage, establishing administrative records, managing records at Hanford, electronic mail -- legal and records issues, NARA-GAO reports status, consultive selling, automated indexing, decentralized approach to scheduling at a DOE office, developing specific records management programs, storage and retrieval at Savannah River Plant, an optical disk case study, and special interest group reports.

  7. Change management with the electronic health record.

    PubMed

    Schmucker, DeeAnn

    2009-01-01

    Many medical organizations have already changed to, are implementing, or are contemplating implementing an electronic health record (EHR) system. As in all change, some people accept the switch from paper to EHRs much easier and with more enthuiasm than others. It is common for organizations to overlook the importance of including change management properties as they create the overall plan for the change from paper to paperless. Often the result of this is anger, frustration, and lack of cooperation or even sabotage from physicians and office staff who are the recipients of the training on the EHR system. This article examines the steps for, opportunities for, and positive results from incorporating change management principles from the very beginning, and the benefits accrued by understanding and utilizing the concepts of good choices, relationships, planning, and feedback.

  8. Types of Managed Care Plans

    MedlinePlus

    ... AAP Find a Pediatrician Family Life Medical Home Health Insurance Pediatric Specialists Family Dynamics Media Work & Play Getting ... Your Community Healthy Children > Family Life > Medical Home > Health Insurance > Types of Managed Care Plans Family Life Listen ...

  9. Managing Records for the Long Term - 12363

    SciTech Connect

    Montgomery, John V.; Gueretta, Jeanie

    2012-07-01

    The U.S. Department of Energy (DOE) is responsible for managing vast amounts of information documenting historical and current operations. This information is critical to the operations of the DOE Office of Legacy Management. Managing legacy records and information is challenging in terms of accessibility and changing technology. The Office of Legacy Management is meeting these challenges by making records and information management an organizational priority. The Office of Legacy Management mission is to manage DOE post-closure responsibilities at former Cold War weapons sites to ensure the future protection of human health and the environment. These responsibilities include environmental stewardship and long-term preservation and management of operational and environmental cleanup records associated with each site. A primary organizational goal for the Office of Legacy Management is to 'Preserve, Protect, and Share Records and Information'. Managing records for long-term preservation is an important responsibility. Adequate and dedicated resources and management support are required to perform this responsibility successfully. Records tell the story of an organization and may be required to defend an organization in court, provide historical information, identify lessons learned, or provide valuable information for researchers. Loss of records or the inability to retrieve records because of poor records management processes can have serious consequences and even lead to an organisation's downfall. Organizations must invest time and resources to establish a good records management program because of its significance to the organization as a whole. The Office of Legacy Management will continue to research and apply innovative ways of doing business to ensure that the organization stays at the forefront of effective records and information management. DOE is committed to preserving records that document our nation's Cold War legacy, and the Office of Legacy

  10. AVLIS production plant waste management plan

    SciTech Connect

    Not Available

    1984-11-15

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables.

  11. National Ignition Facility Configuration Management Plan

    SciTech Connect

    Cabral, S G; Moore, T L

    2002-10-01

    This Configuration Management Plan (CMP) describes the technical and administrative management process for controlling the National Ignition Facility (NIF) Project configuration. The complexity of the NIF Project (i.e., participation by multiple national laboratories and subcontractors involved in the development, fabrication, installation, and testing of NIF hardware and software, as well as construction and testing of Project facilities) requires implementation of the comprehensive configuration management program defined in this plan. A logical schematic illustrating how the plan functions is provided in Figure 1. A summary of the process is provided in Section 4.0, Configuration Change Control. Detailed procedures that make up the overall process are referenced. This CMP is consistent with guidance for managing a project's configuration provided in Department of Energy (DOE) Order 430.1, Guide PMG 10, ''Project Execution and Engineering Management Planning''. Configuration management is a formal discipline comprised of the following four elements: (1) Identification--defines the functional and physical characteristics of a Project and uniquely identifies the defining requirements. This includes selection of components of the end product(s) subject to control and selection of the documents that define the project and components. (2) Change management--provides a systematic method for managing changes to the project and its physical and functional configuration to ensure that all changes are properly identified, assessed, reviewed, approved, implemented, tested, and documented. (3) Data management--ensures that necessary information on the project and its end product(s) is systematically recorded and disseminated for decision-making and other uses. Identifies, stores and controls, tracks status, retrieves, and distributes documents. (4) Assessments and validation--ensures that the planned configuration requirements match actual physical configurations and

  12. Minerals Management Service: Strategic plan

    SciTech Connect

    1997-09-30

    This plan addresses the management of the mineral resources on the Outer Continental Shelf in an environmentally sound and safe manner and the timely collection, verification, and distribution of mineral revenues from Federal and Indian lands. The Minerals Management Service (MMS) manages the Nation`s natural gas, oil and other mineral resources on the Outer Continental Shelf (OCS), and collects, accounts for, and disburses revenues from offshore federal mineral leases and from onshore mineral leases on Federal and Indian lands.

  13. Underground storage tank management plan

    SciTech Connect

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  14. GSC configuration management plan

    NASA Technical Reports Server (NTRS)

    Withers, B. Edward

    1990-01-01

    The tools and methods used for the configuration management of the artifacts (including software and documentation) associated with the Guidance and Control Software (GCS) project are described. The GCS project is part of a software error studies research program. Three implementations of GCS are being produced in order to study the fundamental characteristics of the software failure process. The Code Management System (CMS) is used to track and retrieve versions of the documentation and software. Application of the CMS for this project is described and the numbering scheme is delineated for the versions of the project artifacts.

  15. 32 CFR 806.10 - Records management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Records management. 806.10 Section 806.10 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE ADMINISTRATION AIR FORCE FREEDOM OF INFORMATION ACT PROGRAM § 806.10 Records management. Keep records that were fully released...

  16. 32 CFR 806.10 - Records management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Records management. 806.10 Section 806.10 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE ADMINISTRATION AIR FORCE FREEDOM OF INFORMATION ACT PROGRAM § 806.10 Records management. Keep records that were fully released...

  17. 32 CFR 806.10 - Records management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 6 2014-07-01 2014-07-01 false Records management. 806.10 Section 806.10 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE ADMINISTRATION AIR FORCE FREEDOM OF INFORMATION ACT PROGRAM § 806.10 Records management. Keep records that were fully released...

  18. 32 CFR 806.10 - Records management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Records management. 806.10 Section 806.10 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE ADMINISTRATION AIR FORCE FREEDOM OF INFORMATION ACT PROGRAM § 806.10 Records management. Keep records that were fully released...

  19. 32 CFR 806.10 - Records management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Records management. 806.10 Section 806.10 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE ADMINISTRATION AIR FORCE FREEDOM OF INFORMATION ACT PROGRAM § 806.10 Records management. Keep records that were fully released...

  20. Benchmarking of Planning Models Using Recorded Dynamics

    SciTech Connect

    Huang, Zhenyu; Yang, Bo; Kosterev, Dmitry

    2009-03-15

    Power system planning extensively uses model simulation to understand the dynamic behaviors and determine the operating limits of a power system. Model quality is key to the safety and reliability of electricity delivery. Planning model benchmarking, or model validation, has been one of the central topics in power engineering studies for years. As model validation aims at obtaining reasonable models to represent dynamic behavior of power system components, it has been essential to validate models against actual measurements. The development of phasor technology provides such measurements and represents a new opportunity for model validation as phasor measurements can capture power system dynamics with high-speed, time-synchronized data. Previously, methods for rigorous comparison of model simulation and recorded dynamics have been developed and applied to quantify model quality of power plants in the Western Electricity Coordinating Council (WECC). These methods can locate model components which need improvement. Recent work continues this effort and focuses on how model parameters may be calibrated to match recorded dynamics after the problematic model components are identified. A calibration method using Extended Kalman Filter technique is being developed. This paper provides an overview of prior work on model validation and presents new development on the calibration method and initial results of model parameter calibration.

  1. Fluid Management Plan for the Project Shoal Area, Off-sites Subproject, CAU 447, Revision 0 (with Record of Technical Change No. 1, 2, and 3)

    SciTech Connect

    USDOE /NV

    1999-04-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV) has initiated the Off-Site Project to characterize the hazards posed to human health and the environment as a result of underground nuclear testing activities at facilities other than the Nevada Test Site (NTS). The Project Shoal Area (PSA) is one of the Off-Sites Project areas located off the NTS, but within the state of Nevada. The PSA is located approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. Four wells were drilled at the PSA in 1996 as part of the site investigation administered through the Federal Facility Agreement and Consent Order (FFACO) (1996). The hydrogeologic data gathered from these wells was used to support the groundwater flow and contaminant transport modeling of the PSA. However, the subsequent evaluation of the groundwater model concluded that further delineation of the subsurface was required to reduce uncertainties in the model. In accordance with the FFACO, an addendum to the Corrective Action Investigation Plan (CAIP) for the proposed PSA subsurface investigation, Corrective Action Unit 447, was developed. The addendum proposed the drilling and construction of four additional wells and the conduct of hydrologic testing at the PSA. This Fluid Management Plan (FMP) provides guidance for the management of fluids generated from the well construction and testing activities at the PSA.

  2. Waste Management Quality Assurance Plan

    SciTech Connect

    Not Available

    1993-11-30

    Lawrence Berkeley Laboratory`s Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department`s activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A.

  3. A reservoir management plan

    SciTech Connect

    Allis, R.G.

    1989-06-16

    There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

  4. Demil planning and management system

    SciTech Connect

    Huber, C.C.; Bormet, S.M.; Whitfield, R.G.; Bowen, M.; Chun, K.C.; Golden, R.E.; Fuller, R.

    1997-08-01

    The National Maintenance Point (NMP) Branch of the US Army Industrial Operations Command (IOC) serves as the Single Manager for Conventional Ammunition (SMCA) agent for managing the renovation, modification, recycling, and disposal of conventional ammunition, thereby improving readiness. The mission of the NMP includes program management for demilitarization (demil) activities, ammunition maintenance, and ammunition peculiar equipment (APE) projects. Through an Interagency Agreement between the US Army and the US Department of Energy, Argonne National Laboratory (ANL) is developing an integrated data management system, called the Demil Planning and Management System (DPMS), for IOC. DPMS is intended to help NMP efficiently manage information on ongoing demil project activities and asset inventories, plan future projects, and allocate budgets. This system, when fully implemented, will also make it possible for the user community to interactively access the DPMS database; perform data entry and queries; and run reports through network, modem, and Internet access to the system. This paper describes the principal components of the DPMS, current capabilities, and planned enhancements.

  5. Management Planning: Innovation on Campus.

    ERIC Educational Resources Information Center

    Hall, Stephen S. J.

    1973-01-01

    Management planning is a body of concepts and techniques designed to facilitate the analytical and forecasting processes within a department, to increase the decision-making prerogatives of the department director within predetermined guidelines, and to encourage and reinforce communication both among the departments and between the departments…

  6. Hanford Environmental Management Program Plan

    SciTech Connect

    DeFigh-Price, C.

    1989-09-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office (DOE-RL). Westinghouse Hanford Company (WHC) has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as reporting and planning and to facilitate compliance with environmental regulations. This document describes the scope of work funded by this program for Fiscal Year (FY) 1990, presents the prioritized tasks covered, the management structure in place and the assessment allocation methodology used to determine the FY 1990 assessments. 15 refs., 3 figs., 2 tabs.

  7. 1995 Department of Energy Records Management Conference

    SciTech Connect

    1995-07-01

    The Department of Energy (DOE) Records Management Group (RMG) provides a forum for DOE and its contractor personnel to review and discuss subjects, issues, and concerns of common interest. This forum will include the exchange of information, and interpretation of requirements, and a dialog to aid in cost-effective management of the DOE Records Management program. Issues addressed by the RMG may result in recommendations for DOE-wide initiatives. Proposed DOE-wide initiatives shall be, provided in writing by the RMG Steering Committee to the DOE Records Management Committee and to DOE`s Office of ERM Policy, Records, and Reports Management for appropriate action. The membership of the RMG is composed of personnel engaged in Records Management from DOE Headquarters, Field sites, contractors, and other organizations, as appropriate. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

  8. National Ignition Facility Risk Management Plan

    SciTech Connect

    Brereton, S.J.

    1997-02-01

    The NIF Risk Management Plan has been prepared in accordance with the DOE Life Cycle Asset Management Good Practice Guide to support Critical Decision 3 of the NIF Project. The objectives of the plan are to: 1) identify the risks to the completion of the Project in terms of meeting technical and regulatory requirements, cost, and schedule, 2) assess the risks in terms of likelihood of occurrence and their impact potential relative to technical performance, ES&H (environment, safety and health), costs, and schedule, and 3) address each identified risk in terms of suitable risk mitigation measures. The documents that form the basis for this risk assessment are as follows: 1. Final Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (DOE, 1996a) and Record of Decision (DOE, 1996b), 2. Preliminary Hazards Analysis (Brereton, 1993), 3. Fire Hazards Analysis (Jensen, 1997), 4. Preliminary Safety Analysis Report (LLNL, 1996a), 5. Reliability, Availability and Maintainability Report, 6. Radiation Protection Evaluation, 7. Primary Criteria and Functional Requirements (LLNL, 1996b), 8. Project Execution Plan (DOE, 1996c), 9. Schedule Risk Assessment, 10. Construction Safety Program (LLNL, 1997), 11. Title I Design Media, 12. Congressional Data Sheet. The process used in developing this plan was to form a Risk Assessment team of knowledgeable project personnel. This included: Assurances Manager, Systems Integration Manager, Project Control Manager, a Risk Management consultant, Deputy Associate Project Engineer for Activation and Start-up (Co-chairperson), and Lead Engineer for Safety Analysis (Co-chairperson). They were familiar with the risk basis documents and developed a list of the key risk elements. A methodology for assigning likelihoods, consequences, and risks was developed. Risk elements were then reviewed, and likelihoods, consequences, and risks were assigned. Risk mitigation measures were then developed. Comments were obtained

  9. Forest Resource Management Plans: A Sustainability Approach

    ERIC Educational Resources Information Center

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  10. Record Management in Nigerian Secondary School Administration

    ERIC Educational Resources Information Center

    Nakpodia, E. D.

    2009-01-01

    This paper examined the usefulness of record management in Nigerian Secondary Schools. Record keeping is one of the administrative principles in secondary school administration and it cannot be overemphasized in any organisation. The continuity of any school organisation depends on availability of useful records of past activities. In a complex…

  11. Performance Demonstration Program Management Plan

    SciTech Connect

    Carlsbad Field Office

    2005-07-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization’s quality assurance (QA) program and procedures or as otherwise directed by

  12. 36 CFR 1236.12 - What other records management and preservation considerations must be incorporated into the...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... planning and systems development life cycle processes, agencies must ensure: (a) That records management...-approved retention period). Where the records will need to be retained beyond the planned life of...

  13. 1994 Department of Energy Records Management Conference

    SciTech Connect

    Not Available

    1994-09-01

    The Department of Energy (DOE) Records Management Group (RMG) provides a forum for DOE and its contractor personnel to review and discuss subjects, issues, and concerns of common interest. This forum will include the exchange of information, and interpretation of requirements, and a dialog to aid in cost-effective management of the DOE Records Management program. This report contains the contributions from this forum.

  14. Waste Management Quality Assurance Plan

    SciTech Connect

    Waste Management Group

    2006-08-14

    The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs.

  15. A strategic planning framework for endowment management.

    PubMed

    McLean, R A

    1990-01-01

    New techniques in portfolio management can be used to integrate the management of long-term investments into implementation of the strategic plan. This integration requires cash-flow planning, portfolio restructuring, and continuous monitoring.

  16. Suicide Management Plan--Post Suicide Response.

    ERIC Educational Resources Information Center

    Imhoff, Robert; Royster, Sharon

    This document contains a suicide management plan developed specifically for colleges. The suicide management plan described includes pre-planning, immediate response to the event, press releases, college staff jobs, college responses (such as memorials or scholarships), interaction with the family, and staff counseling. The plan is presented as a…

  17. Information resource management concepts for records managers

    SciTech Connect

    Seesing, P.R.

    1992-10-01

    Information Resource Management (ERM) is the label given to the various approaches used to foster greater accountability for the use of computing resources. It is a corporate philosophy that treats information as it would its other resources. There is a reorientation from simply expenditures to considering the value of the data stored on that hardware. Accountability for computing resources is expanding beyond just the data processing (DP) or management information systems (MIS) manager to include senior organization management and user management. Management`s goal for office automation is being refocused from saving money to improving productivity. A model developed by Richard Nolan (1982) illustrates the basic evolution of computer use in organizations. Computer Era: (1) Initiation (computer acquisition), (2) Contagion (intense system development), (3) Control (proliferation of management controls). Data Resource Era: (4) Integration (user service orientation), (5) Data Administration (corporate value of information), (6) Maturity (strategic approach to information technology). The first three stages mark the growth of traditional data processing and management information systems departments. The development of the IRM philosophy in an organization involves the restructuring of the DP organization and new management techniques. The three stages of the Data Resource Era represent the evolution of IRM. This paper examines each of them in greater detail.

  18. Solid Waste Management Plan. Revision 4

    SciTech Connect

    1995-04-26

    The waste types discussed in this Solid Waste Management Plan are Municipal Solid Waste, Hazardous Waste, Low-Level Mixed Waste, Low-Level Radioactive Waste, and Transuranic Waste. The plan describes for each type of solid waste, the existing waste management facilities, the issues, and the assumptions used to develop the current management plan.

  19. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 32 2013-07-01 2013-07-01 false Management plans. 763.93 Section 763... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school,...

  20. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 32 2012-07-01 2012-07-01 false Management plans. 763.93 Section 763... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school,...

  1. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 31 2014-07-01 2014-07-01 false Management plans. 763.93 Section 763... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school,...

  2. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Management plans. 763.93 Section 763... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school,...

  3. Information resource management concepts for records managers

    SciTech Connect

    Seesing, P.R.

    1992-10-01

    Information Resource Management (ERM) is the label given to the various approaches used to foster greater accountability for the use of computing resources. It is a corporate philosophy that treats information as it would its other resources. There is a reorientation from simply expenditures to considering the value of the data stored on that hardware. Accountability for computing resources is expanding beyond just the data processing (DP) or management information systems (MIS) manager to include senior organization management and user management. Management's goal for office automation is being refocused from saving money to improving productivity. A model developed by Richard Nolan (1982) illustrates the basic evolution of computer use in organizations. Computer Era: (1) Initiation (computer acquisition), (2) Contagion (intense system development), (3) Control (proliferation of management controls). Data Resource Era: (4) Integration (user service orientation), (5) Data Administration (corporate value of information), (6) Maturity (strategic approach to information technology). The first three stages mark the growth of traditional data processing and management information systems departments. The development of the IRM philosophy in an organization involves the restructuring of the DP organization and new management techniques. The three stages of the Data Resource Era represent the evolution of IRM. This paper examines each of them in greater detail.

  4. Make safety programs work efficiently with an effective management plan

    SciTech Connect

    Lyle, D.

    1995-07-01

    Like budgets or any other major projects, safety works better when everyone in the company commits to manage the program effectively. Let someone overspend a budget or miss a projected revenue plan and a company moves quickly to correct the problem. However, there is a tendency to ignore a manager whose department has a poor safety record, as though it`s bad luck.

  5. Managing School Social Work Records

    ERIC Educational Resources Information Center

    Garrett, Kendra J.

    2012-01-01

    This article documents results of a survey of 73 school social workers regarding their record-keeping practices. These social workers indicated that time pressures are a major challenge to documentation; they struggle to know what to include, and they worry about privacy. More than half fail to consistently include assessment information, progress…

  6. 78 FR 61373 - Animal Center Master Plan Record of Decision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-03

    ... HUMAN SERVICES National Institutes of Health Animal Center Master Plan Record of Decision SUMMARY: The... Final EIS. This action is for a long-range physical Master Plan for National Institutes of Health Animal... Environmental Impact Statement for the Master Plan, National Institutes of Health Animal Center,...

  7. Managing Records as Evidence and Information.

    ERIC Educational Resources Information Center

    Cox, Richard J.

    For the past three decades, policies regarding a variety of information issues have emanated from federal agencies, legislative chambers, and corporate boardrooms. Records policies are critically important for records professionals to develop and use as a means of strategically managing the information and evidence found in the millions of records…

  8. 76 FR 75421 - Managing Government Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... records, including email and social media, deploying cloud-based services or storage solutions, and... From the Federal Register Online via the Government Publishing Office ] Vol. 76 Thursday, No. 231 December 1, 2011 Part III The President Memorandum of November 28, 2011--Managing Government Records #0;...

  9. Overview of the Hanford risk management plan

    SciTech Connect

    Halverson, T.G.

    1998-03-26

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context.

  10. 36 CFR 219.31 - Maintenance of the plan and planning records.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Planning Documentation § 219... typographical errors or other non-substantive changes; and (4) Changes in monitoring methods other than...

  11. CCSF Management Plan, 2002/2003.

    ERIC Educational Resources Information Center

    City Coll. of San Francisco, CA.

    This is the 2001-2002 management plan for the City College of San Francisco (CCSF), California. The plan contains the following sections: (1) Overview of Planning and Budgeting; (2) Vision, Values, and Mission; (3) College Goals and Strategic Priorities; (4) Annual Institutional Plan CCSF 2002-03; (5) College Core Performance Indicators; and (6)…

  12. Oak Ridge Reservation Waste Management Plan

    SciTech Connect

    Turner, J.W.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  13. Waste management plan for the APT

    SciTech Connect

    England, J.L.

    1997-08-22

    This revision of the APT Waste Management Plan details the waste management requirements and issues specific to the APT plant for design considerations, construction, and operation. The APT Waste Management Plan is by its nature a living document and will be reviewed at least annually and revised as required.

  14. Spent Nuclear Fuel project, project management plan

    SciTech Connect

    Fuquay, B.J.

    1995-10-25

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  15. FY 2015 - Stockpile Stewardship and Management Plan

    SciTech Connect

    2014-04-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  16. FY 2016 - Stockpile Stewardship and Management Plan

    SciTech Connect

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  17. Oak Ridge National Laboratory Waste Management Plan

    SciTech Connect

    Not Available

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  18. Tank waste remediation system configuration management plan

    SciTech Connect

    Vann, J.M.

    1998-01-08

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.

  19. Total quality management program planning

    SciTech Connect

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  20. Solid Waste Management Planning--A Methodology

    ERIC Educational Resources Information Center

    Theisen, Hilary M.; And Others

    1975-01-01

    This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)

  1. SNL/CA Cultural Resources Management Plan.

    SciTech Connect

    Larsen, Barbara L.

    2005-11-01

    The SNL/CA Cultural Resources Management Plan satisfies the site's Environmental Management System requirement to promote long-term stewardship of cultural resources. The plan summarizes the cultural and historical setting of the site, identifies existing procedures and processes that support protection and preservation of resources, and outlines actions that would be initiated if cultural resources were discovered onsite in the future.3

  2. Managing Dualities in Planned Change Initiatives

    ERIC Educational Resources Information Center

    Barge, J. Kevin; Lee, Michael; Maddux, Kristy; Nabring, Richard; Townsend, Bryan

    2008-01-01

    Dualities play an important role in creating the conditions for change and managing planned change initiatives. Building on Seo, Putnam, and Bartunek's (2003) work, this study focuses on the dualities associated with managing change processes. A case study of a planned change process called the Circle of Prosperity Initiative, a multi-stakeholder…

  3. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    ERIC Educational Resources Information Center

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  4. Project Management Plan (PMP) for Work Management Implementation

    SciTech Connect

    SHIPLER, C.E.

    2000-01-13

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  5. [Evaluation model for municipal health planning management].

    PubMed

    Berretta, Isabel Quint; Lacerda, Josimari Telino de; Calvo, Maria Cristina Marino

    2011-11-01

    This article presents an evaluation model for municipal health planning management. The basis was a methodological study using the health planning theoretical framework to construct the evaluation matrix, in addition to an understanding of the organization and functioning designed by the Planning System of the Unified National Health System (PlanejaSUS) and definition of responsibilities for the municipal level under the Health Management Pact. The indicators and measures were validated using the consensus technique with specialists in planning and evaluation. The applicability was tested in 271 municipalities (counties) in the State of Santa Catarina, Brazil, based on population size. The proposed model features two evaluative dimensions which reflect the municipal health administrator's commitment to planning: the guarantee of resources and the internal and external relations needed for developing the activities. The data were analyzed using indicators, sub-dimensions, and dimensions. The study concludes that the model is feasible and appropriate for evaluating municipal performance in health planning management.

  6. Change Management – Recommendations for Successful Electronic Medical Records Implementation

    PubMed Central

    Shoolin, J.S.

    2010-01-01

    Summary Change is difficult and managing change even more so. With the advent of Electronic Medical Records (EMRs) and the difficulty of its acceptance, understanding physician’s attitudes and the psychology of change management is imperative. While many authors describe change management theories, one comes nearest to describing this particularly difficult transition. In 1969, Elizabeth Kübler-Ross wrote her seminal treatise, On Death and Dying, detailing the psychological changes terminally ill patients undergo. Her grieving model is a template to examine the impact of change. By following a physician through the EMR maze, understanding the difficulties he/she perceives and developing a plan other change agents are able to use, the paper gives practical recommendations to EMR change management. PMID:23616842

  7. Software configuration management plan for HANDI 2000 business management system

    SciTech Connect

    BENNION, S.I.

    1999-02-10

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software, as well as any custom developed software. This plan establishes requirements and processes for uniform documentation and coordination of HANDI 2000. This SCMP becomes effective as of this document's acceptance and will provide guidance through implementation efforts.

  8. Automated transportation management system (ATMS) software project management plan (SPMP)

    SciTech Connect

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  9. The flight planning - flight management connection

    NASA Technical Reports Server (NTRS)

    Sorensen, J. A.

    1984-01-01

    Airborne flight management systems are currently being implemented to minimize direct operating costs when flying over a fixed route between a given city pair. Inherent in the design of these systems is that the horizontal flight path and wind and temperature models be defined and input into the airborne computer before flight. The wind/temperature model and horizontal path are products of the flight planning process. Flight planning consists of generating 3-D reference trajectories through a forecast wind field subject to certain ATC and transport operator constraints. The interrelationships between flight management and flight planning are reviewed, and the steps taken during the flight planning process are summarized.

  10. Waste Isolation Pilot Plant, Land Management Plan

    SciTech Connect

    Not Available

    1993-12-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

  11. Records Management: Preserving the Past to Make the Future

    NASA Technical Reports Server (NTRS)

    Petro, Kathryn

    2004-01-01

    As an intern in the Records Management Office at NASA, I have learned the importance of records management and teamwork. I work in building 60 with Kevin Coleman, the Records and Forms Manager and History Officer, and Deborah Demaline, the senior records specialist. Prior to my internship, I had never paid attention to records and their role in operating a business. However, after my first assignment of identifying files and filling out a C-277 form, I realized the importance of preserving each file. Since NASA is a government agency, keeping our records in a safe and easily accessible area is a major priority. As the records have accumulated over the years, and the destruction of records has been put on hold due to the fairly recent tobacco litigation; the amount of NASA s records has been quickly accumulating. Currently, our records are stored at Plum Brook in Sandusky, Ohio. Recently, rain has leaked through the bunkers and caused damage to some of our records boxes. Plum Brook has been experiencing difficulty in finding the funds to repair the damage. NASA Glenn is reluctant to give Plum Brook more money because the staff at the Sandusky site has not shown us a detailed summary of what they are doing with the funds we give them annually. Even though storing our records at Plum Brook comes with little cost, there are plenty other companies that offer a records storage area and a special software database for easy record retrieval. My assignment is to do a feasibility study on these companies to see how they compare in providing the appropriate criteria for NASA Glenn's needs. Other research I am doing is on which companies will allow us to convert our physical records into an electronic database for quicker retrieval and to eliminate the cost of storing our records in a facility altogether. The two studies have required me to not only work closely with the Records Management Department, but also the Information Technology staff. It has been important for me to

  12. 78 FR 77550 - Integrated Corridor Management Deployment Planning Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... Federal Highway Administration Integrated Corridor Management Deployment Planning Grants AGENCY: Federal... is extending the application period for the Integrated Corridor Management Deployment Planning Grants... Integrated Corridor Management Deployment Planning Grants. The purpose of this notice was to invite...

  13. 76 FR 53149 - North American Waterfowl Management Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-25

    ... Fish and Wildlife Service North American Waterfowl Management Plan AGENCY: Fish and Wildlife Service... Wildlife Service, announce the availability of the draft North American Waterfowl Management Plan Revision... Plan Revision, which was developed in close consultation with the waterfowl management...

  14. Emergency management: expanding the disaster plan.

    PubMed

    Ross, Kevin L; Bing, Caryn M

    2007-06-01

    A comprehensive emergency management plan (CEMP) is key to minimizing the disruption of patient care and services during and after a natural or man-made disaster. The home health nurse can play a key role in enhancing, expanding, and evaluating the effectiveness of the organization's disaster plan. The components of a CEMP and lessons learned from actual implementation of disaster plans in home care are addressed. The disasters and emergencies of the past few years, such as threats of terrorism, hurricanes, floods, wildfires, tornadoes, and earthquakes, have validated the need to extend the emergency preparedness plan to a more comprehensive approach to emergency management. Communities, healthcare providers, and individuals/families all have been urged to take a more comprehensive look at their readiness for these types of events. Home healthcare organizations, including home health agencies, hospice providers, infusion providers, and medical equipment companies, can take a fresh and comprehensive look at their emergency management plan.

  15. BROOKHAVEN NATIONAL LABORATORY WILDLIFE MANAGEMENT PLAN.

    SciTech Connect

    NAIDU,J.R.

    2002-10-22

    The purpose of the Wildlife Management Plan (WMP) is to promote stewardship of the natural resources found at the Brookhaven National Laboratory (BNL), and to integrate their protection with pursuit of the Laboratory's mission.

  16. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  17. Special event planning for the emergency manager.

    PubMed

    Gaynor, Peter T

    2009-11-01

    In the domain of emergency management and homeland security there is a lack of a formal planning process at the local level when it comes to special event planning. The unique nature of special event planning demands an understanding of the planning process for both traditional and non-traditional planning partners. This understanding will make certain that local governments apply due diligence when planning for the safety of the public. This paper offers a practical roadmap for planning at the local level. It will address those 'special events' that are beyond routine local events but not of a sufficient scale to be granted National Special Security Event status. Due to the infrequency of 'special events' in most communities, it is imperative that deliberate planning takes place. Upon conclusion, the reader will be able to construct a planning process tailored to the needs of their community, guide both traditional and non-traditional planning partners through the planning process, determine priorities, explore alternatives, plan for contingencies, conduct a confirmation brief, facilitate operations and assemble an after-action report and improvement plan. PMID:20378490

  18. Time-Management Planning for Educational Facilities.

    ERIC Educational Resources Information Center

    McIsaac, Donald N.; And Others

    Three conference papers concerned with systems analysis and time management planning. One paper is concerned with techniques, especially the application of the "critical path method" or PERT (Program Evaluation Review Technique) in planning construction activities. A second paper concerns problems associated with collecting and communicating…

  19. Planning and Managing School Facilities. Second Edition.

    ERIC Educational Resources Information Center

    Kowalski, Theodore J.

    This book addresses the administrative procedures associated with planning and managing school facilities. As noted at the outset, practitioner interest in school facilities has been growing rapidly in recent years because decades of neglect, poor planning, and cost cutting have created a situation in which large numbers of America's school…

  20. Do You Have a Crisis Management Plan?

    ERIC Educational Resources Information Center

    Pleviak, Walter; Milkevitch, Frank

    2001-01-01

    Although certain crises cannot be prevented, reactions to many can be planned. A crisis-management team should be organized for each building. Critical crisis-plan elements include telephone trees, forms, reference articles, sample letters, and processes for dealing with local media. Spokespersons should have facts straight before speaking. (MLH)

  1. Draft of the PHENIX Management Plan

    SciTech Connect

    Not Available

    1994-03-10

    The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants.

  2. Incentive pay plans boost managers' performance.

    PubMed

    Biggs, D P

    1987-03-01

    Incentive compensation, which has become commonplace in highly competitive industries, is gradually being introduced in health care settings. Although it has not been used extensively in not-for-profit hospitals, its advantages make it a natural tool for administrators who want to retain their best managers and to achieve important special objectives. Management incentives--awards based on the accomplishment of special objectives--enable boards of trustees and senior managers not only to meet difficult hospital objectives but also to attract and motivate key managers and to promote participative management and teamwork. An effective management incentive compensation program requires five support systems: strategic and operating plans; annual objectives for each manager derived from the strategic and operating plans; measureable performance standards; management action plans, which incorporate the objectives and performance standards and are used in directing each manager's efforts; and a performance evaluation system that forces tough yet reasonable evaluations. In addition to these systems, senior managers must exhibit commitment to change, and objectives must go beyond simply managing individual units well, targeting such goals as improvement of outpatient care utilization, recruitment of specialized staff physicians, and the creation of preferred provider and health maintenance organizations.

  3. Soil Management Plan For The Potable Water System Upgrades Project

    SciTech Connect

    Field, S. M.

    2007-04-01

    This plan describes and applies to the handling and management of soils excavated in support of the Y-12 Potable Water Systems Upgrades (PWSU) Project. The plan is specific to the PWSU Project and is intended as a working document that provides guidance consistent with the 'Soil Management Plan for the Oak Ridge Y-12 National Security Complex' (Y/SUB/92-28B99923C-Y05) and the 'Record of Decision for Phase II Interim Remedial Actions for Contaminated Soils and Scrapyard in Upper East Fork Popular Creek, Oak Ridge, Tennessee' (DOE/OR/01-2229&D2). The purpose of this plan is to prevent and/or limit the spread of contamination when moving soil within the Y-12 complex. The major feature of the soil management plan is the decision tree. The intent of the decision tree is to provide step-by-step guidance for the handling and management of soil from excavation of soil through final disposition. The decision tree provides a framework of decisions and actions to facilitate Y-12 or subcontractor decisions on the reuse of excavated soil on site and whether excavated soil can be reused on site or managed as waste. Soil characterization results from soil sampling in support of the project are also presented.

  4. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... National Park Service General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final... Management Plan/Wilderness Study/Off-Road Vehicle Management Plan (FEIS/GMP/WS/ORV Plan), Big Cypress... proposed wilderness (about 37,567 acres), and develop limited new hiking-only trails. The entire...

  5. Planning, Designing and Managing Higher Education Institutions

    ERIC Educational Resources Information Center

    Daigneau, William A.; Valenti, Mark S.; Ricciarini, Sylvana; Bender, Stephen O.; Alleyne, Nicole; Di Grappa, Michael; Duart, Josep M.; Lupianez, Francisco; Sanchez, Miguel Angel Ehrenzweig

    2005-01-01

    The OECD Programme on Educational Building, together with the Association of Higher Education Facilities Officers (APPA) and the OECD Programme on Institutional Management in Higher Education, organised an international conference on the planning, design and management of facilities for higher education institutions on April 24-27, 2005. The…

  6. Graduate Student Project: Operations Management Product Plan

    ERIC Educational Resources Information Center

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  7. Total quality management -- Remedial actions planning program

    SciTech Connect

    Petty, J.L.; Horne, T.E.

    1989-01-01

    This paper describes the management approach being taken within the Hazardous Waste Remedial Actions Program (HAZWRAP) Support Contractor Office (SCO) to ensure quality of services in a highly competitive waste management environment. An overview is presented of the contractor support role assigned to Martin Marietta Energy Systems, Inc., by the Department of Energy (DOE) national program for managing hazardous waste. The HAZWRAP SCO mission, organizational structure, and major programs are outlined, with emphasis on waste management planning for the DOE Work for Others (WFO) Program. The HAZWRAP SCO provides waste management technical support, via interagency agreements between DOE and various Department of Defense (DOD) agencies for DOD sponsors planning remedial response actions. The remainder of the paper focuses on how the concept of Total Quality Management is applied to the HAZWRAP Remedial Actions Planning (RAP) Program. The management challenge is to achieve quality on a ''system'' basis where all functional elements of program management synergistically contribute to the total quality of the effort. The quality assurance (QA) program requirements applied to the RAP Program and its subcontractors are discussed. The application of management principles in the areas of program management, procurement, and QA to achieve total quality is presented. 3 refs.

  8. 78 FR 39314 - Notice of Availability of the Decision Record for the Delta River Special Recreation Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-01

    ... Bureau of Land Management Notice of Availability of the Decision Record for the Delta River Special... the availability of the Decision Record (DR) for the Delta River Special Recreation Management Area... Assessment (EA) for the Delta River Special Recreation Management Area (SRMA) Plan and East Alaska...

  9. Productivity enhancement planning using participative management concepts

    NASA Technical Reports Server (NTRS)

    White, M. E.; Kukla, J. C.

    1985-01-01

    A productivity enhancement project which used participative management for both planning and implementation is described. The process and results associated with using participative management to plan and implement a computer terminal upgrade project where the computer terminals are used by research and development (R&D) personnel are reported. The upgrade improved the productivity of R&D personnel substantially, and their commitment of the implementation is high. Successful utilization of participative management for this project has laid a foundation for continued style shift toward participation within the organization.

  10. The readability of federal land management plans

    NASA Astrophysics Data System (ADS)

    Gallagher, Thomas J.; Patrick-Riley, Kent

    1989-01-01

    Regulations to implement the National Environmental Policy Act state that environmental impact statements shall be written in “plain language”. Federal land management agencies operate under this guideline when they prepare plans for their lands. We examined 23 agency plans, using the Flesch Reading Ease Scale, to determine if they met this criterion. The scores show that the plans are written for people with three to six years of college education, far beyond the reading ability of the average person. The results suggest that the plans may limit or bias who participates in agency planning. National policy on the readability of the plans needs to be clarified, and agencies need to evaluate, and defend or revise, their writing programs.

  11. Software configuration management plan for HANDI 2000 business management system

    SciTech Connect

    Wilson, D.

    1998-08-25

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software as well as any custom developed software. This plan establishes requirements and processes for uniform documentation control, system change control, systematic evaluation and coordination of HANDI 2000. This SCMP becomes effective as this document is acceptance and will provide guidance through implementation efforts.

  12. 36 CFR 1236.6 - What are agency responsibilities for electronic records management?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-1235 of this subchapter; (b) Integrate records management and preservation considerations into the... responsibilities for electronic records management? 1236.6 Section 1236.6 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT...

  13. Myopia management: multihospital portfolio planning.

    PubMed

    Irish, G G

    1987-10-01

    The acquisition and divestiture of organizational business units demonstrate management's strategy in response to an evolving marketplace. From a strategic perspective, the most significant danger to a corporation is not having the "right" portfolio of businesses or products to respond to the marketplace. This article describes a conceptual model that a multihospital system executive might use to determine the growth and diversification of the organization's portfolio of businesses. The model involves the application of market, financial, and microeconomic theories in a logical sequence to assist management in making business acquisition and divestiture decisions.

  14. Management plan for Facility Effluent Monitoring Plan activities

    SciTech Connect

    Nickels, J.M.; Pratt, D.R.

    1991-08-01

    The DOE/RL 89-19, United States Department of Energy-Richland Operations Office Environmental Protection Implementation Plan (1989), requires the Hanford Site to prepare an Environmental Monitoring Plan (EMP) by November 9, 1991. The DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (1991), provides additional guidance and requires implementation of the EMP within 36 months of the effective data of the rule. DOE Order 5400.1, General Environmental Protection Program, requires each US Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials to prepare an EMP. This EMP is to identify and discuss two major activities: (1) effluent monitoring and (2) environmental surveillance. At the Hanford Site, the site-wide EMP will consist of the following elements: (1) A conceptual plan addressing effluent monitoring and environmental surveillance; (2) Pacific Northwest Laboratory (PNL) site-wide environmental surveillance program; (3) Westinghouse Hanford Company (Westinghouse Hanford) effluent monitoring program consisting of the near-field operations environmental monitoring activities and abstracts of each Facility Effluent Monitoring Plan (FEMP). This management plan addresses the third of these three elements of the EMP, the FEMPs.

  15. [Infrastructure and contents of clinical data management plan].

    PubMed

    Shen, Tong; Xu, Lie-dong; Fu, Hai-jun; Liu, Yan; He, Jia; Chen, Ping-yan; Song, Yu-fei

    2015-11-01

    Establishment of quality management system (QMS) plays a critical role in the clinical data management (CDM). The objectives of CDM are to ensure the quality and integrity of the trial data. Thus, every stage or element that may impact the quality outcomes of clinical studies should be in the controlled manner, which is referred to the full life cycle of CDM associated with the data collection, handling and statistical analysis of trial data. Based on the QMS, this paper provides consensus on how to develop a compliant clinical data management plan (CDMP). According to the essential requirements of the CDM, the CDMP should encompass each process of data collection, data capture and cleaning, medical coding, data verification and reconciliation, database monitoring and management, external data transmission and integration, data documentation and data quality assurance and so on. Creating and following up data management plan in each designed data management steps, dynamically record systems used, actions taken, parties involved will build and confirm regulated data management processes, standard operational procedures and effective quality metrics in all data management activities. CDMP is one of most important data management documents that is the solid foundation for clinical data quality. PMID:26911029

  16. Hanford cultural resources management plan

    SciTech Connect

    Chatters, J.C.

    1989-06-01

    As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

  17. Data Management Facility Operations Plan

    SciTech Connect

    Keck, Nicole N

    2014-06-30

    The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.

  18. PFP Interface identification and management planning guide

    SciTech Connect

    SINCLAIR, J.C.

    1999-05-20

    The purpose of-this planning guide is to present the process used to identify, document, and control PFP Stabilization and Deactivation Project interfaces. Revisions to this document will include, as attachments, the most recent version of the Project Interface Management List. A preliminary Interface Management List is included in Appendix A. This document is intended be a Project owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. For most revisions that suggest improved processes, PFP management approval is all that will be required.

  19. Solid waste management complex site development plan

    SciTech Connect

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated.

  20. Teaching family planning management and evaluation skills.

    PubMed

    Gorosh, M E; Helbig, D W; Revson, J E

    1980-01-01

    In the last several years the need for training schemes in family planning programme administration has become increasingly apparent with the rapid growth of family planning services throughout the world. This paper reports on the development and use of a series of 16 practical classroom training exercises designed for teaching planning, management and evaluation skills. Each exercise can be introduced, worked and discussed in a morning or an afternoon. It is available in an individual booklet, which contains worksheets, blank tables and step-by-step instructions for working the exercise, along with a discussion of the skills being taught. Topics covered include demographic rates and concepts, the Dryfoos-Polgar-Varkey formula, risk factor analysis, target-setting, case load forecasting, service statistics, contraceptive supplies, manpower planning, couple-year of protection, cost-effectiveness, contraceptive use-effectiveness, life table techniques, numerator analysis, fertility pattern method, sampling methods and questionnaire design. These curriculum materials concentrate on imparting through the medium of actual experience a series of specific management techniques of a quantitative nature that will enhance the ability of the trainees to plan, administer and evaluate any family planning programme anywhere in the world. The exercises in this series have been tested in the family planning training programmes at Columbia University and at Downstate Medical Center in New York. They have also been used in WHO workshops in Thailand and Tanzania and in training programmes in France, Kenya and Nicaragua.

  1. Strategic plan for Hanford Site Environmental Restoration Information Management

    SciTech Connect

    Cowley, P.J.; Beck, J.E.; Gephart, R.E.

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site`s soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site`s production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user`s needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach.

  2. EMP Attachment 2 DOE-SC PNNL Site Data Management Plan

    SciTech Connect

    Bisping, Lynn E.

    2011-12-21

    This Data Management Plan (DMP) describes the data management processes and activities under the Pacific Northwest National Laboratory (PNNL) Site Environmental Monitoring Plan. The activities currently in the Plan are limited to offsite environmental surveillance of PNNL Site radiological releases to the air. The DMP provides guidance on data capture, processing and transmittal, and database configuration management. The requirements for the PNNL Site Environmental Monitoring (SEM) Database and associated records are documented in order to assure that vital data are recorded accurately, stored in a manner that retains data integrity, and are suitable for analyst to use. Protocols and procedures must ensure the data will be adequate and robust.

  3. Hanford Environmental Management Program plan; Revision 1

    SciTech Connect

    DeFigh-Price, C.

    1990-08-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office. Westinghouse Hanford Company has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as regulatory reporting and planning and to facilitate compliance with environmental regulations. Key activities include preparing and/or coordinating waste management and environmental restoration site-wide planning documents, maintaining the Waste Inventory Data System, coordinating site-wide regulatory reporting (SARA Title III, Dangerous Waste Report, etc.), Tri-Party Agreement Administration and Base (nonprogram specific) regulatory permitting and National Environmental Policy Act activities. Fiscal year (FY) 1991 is the first year this activity will be directly funded. This document describes accomplishments in FY 1990, the scope of work funded by this program for FY 1991, the prioritized tasks covered, and the management structure in place. 16 refs., 4 figs., 1 tab.

  4. Integrating Records Management (RM) and Information Technology (IT)

    SciTech Connect

    NUSBAUM,ANNA W.; CUSIMANO,LINDA J.

    2000-03-02

    Records Managers are continually exploring ways to integrate their services with those offered by Information Technology-related professions to capitalize on the advantages of providing customers a total solution to managing their records and information. In this day and age, where technology abounds, there often exists a fear on the part of records management that this integration will result in a loss of identity and the focus of one's own mission - a fear that records management may become subordinated to the fast-paced technology fields. They need to remember there is strength in numbers and it benefits RM, IT, and the customer when they can bring together the unique offerings each possess to reach synergy for the benefit of all the corporations. Records Managers, need to continually strive to move ''outside the records management box'', network, expand their knowledge, and influence the IT disciplines to incorporate the concept of ''management'' into their customer solutions.

  5. Hanford site integrated pest management plan

    SciTech Connect

    Giddings, R.F.

    1996-04-09

    The Hanford Site Integrated Pest Management Plan (HSIPMP) defines the Integrated Pest Management (IPM) decision process and subsequent strategies by which pest problems are to be solved at all Hanford Site properties per DOE-RL Site Infrastructure Division memo (WHC 9505090). The HSIPMP defines the roles that contractor organizations play in supporting the IPM process. In short the IPM process anticipates and prevents pest activity and infestation by combining several strategies to achieve long-term pest control solutions.

  6. Management Matters: Planning Goals and Time

    ERIC Educational Resources Information Center

    Pappas, Marjorie L.

    2004-01-01

    This article discusses the importance of setting and implementing goals that can help change and improve a library media program over time--goals that go beyond merely keeping the library media center running. Suggestions for developing an action plan and strategies for effective time management are also presented.

  7. Hanford emergency management plan - release 15

    SciTech Connect

    CARPENTER, G.A.

    1999-07-19

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety.

  8. Project Hanford management contract quality improvement project management plan

    SciTech Connect

    ADAMS, D.E.

    1999-03-25

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

  9. 36 CFR 1220.12 - What are NARA's records management responsibilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AND RECORDS ADMINISTRATION RECORDS MANAGEMENT FEDERAL RECORDS; GENERAL § 1220.12 What are NARA's records management responsibilities? (a) The Archivist of the United States issues regulations and... and ensuring proper records disposition, including standards for improving the management of...

  10. Ocean Thermal Energy Conversion Program Management Plan

    SciTech Connect

    Combs, R E

    1980-01-01

    The Office of the Associate Laboratory Director for Energy and Environmental Technology has established the OTEC Program Management Office to be responsible for the ANL-assigned tasks of the OTEC Program under DOE's Chicago Operations and Regional Office (DOE/CORO). The ANL OTEC Program Management Plan is essentially a management-by-objective plan. The principal objective of the program is to provide lead technical support to CORO in its capacity as manager of the DOE power-system program. The Argonne OTEC Program is divided into three components: the first deals with development of heat exchangers and other components of OTEC power systems, the second with development of biofouling counter-measures and corrosion-resistant materials for these components in seawater service, and the third with environmental and climatic impacts of OTEC power-system operation. The essential points of the Management Plan are summarized, and the OTEC Program is described. The organization of the OTEC Program at ANL is described including the functions, responsibilities, and authorities of the organizational groupings. The system and policies necessary for the support and control functions within the organization are discussed. These functions cross organizational lines, in that they are common to all of the organization groups. Also included are requirements for internal and external reports.

  11. 36 CFR 1236.10 - What records management controls must agencies establish for records in electronic information...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false What records management... Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT Records Management and Preservation Considerations for Designing...

  12. 36 CFR 1236.10 - What records management controls must agencies establish for records in electronic information...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false What records management... Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT Records Management and Preservation Considerations for Designing...

  13. Nevada Test Site Resource Management Plan

    SciTech Connect

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  14. AVLIS Production Plant Project Management Plan

    SciTech Connect

    Not Available

    1984-11-15

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  15. Wildlife management, surface mining, and regional planning

    SciTech Connect

    Nieman, T.J.; Merkin, Z.R.

    1995-12-31

    Wildlife management, surface mining, and regional planning historically have had conflicting missions. The cooperative public/private venture which created the Robinson Forest and Cyprus-Amax Wildlife Management Areas is presented as an example of how a regional perspective encourages a symbiotic relationship among these functions. Wildlife management areas, as either an interim or final land use, are shown to incorporate development concepts which benefit the general public, the coal industry, and the environment. Examining the regional pattern of wildlife management areas and refuges confirms the appropriateness of the subject site for this use. It is suggested that the pattern of mined lands can be studied to identify other sites with potential to provide linkages between a wildlife habitat areas and encourage reclamation of such sites to the {open_quotes}fish and wildlife{close_quotes} postmining land use. Such reclamation strategies should be pursued within a long-term planning framework. More research is needed to recreate specific habitat types on drastically disturbed land and planning is needed to assure that sensitive habitats or species are located away from zones likely to undergo future development. Use of geographic information systems to integrate existing environmental information could make such studies more effective. 14 refs., 7 figs.

  16. The electronic patient record: a strategic planning framework.

    PubMed

    Gordon, D B; Marafioti, S; Carter, M; Kunov, H; Dolan, A

    1995-01-01

    Sunnybrook Health Science Center (Sunnybrook) is a multifacility academic teaching center. In May 1994, Sunnybrook struck an electronic patient record taskforce to develop a strategic plan for the implementation of a comprehensive, facility wide electronic patient record (EPR). The taskforce sought to create a conceptual framework which provides context and integrates decision-making related to the comprehensive electronic patient record. The EPR is very much broader in scope than the traditional paper-based record. It is not restricted to simply reporting individual patient data. By the Institute of Medicine's definition, the electronic patient record resides in a system specifically designed to support users through availability of complete and accurate data, practitioner reminders and alerts, clinical decision support systems, links to bodies of medical knowledge, and other aids [1]. It is a comprehensive resource for patient care. The taskforce proposed a three domain model for determining how the EPR affects Sunnybrook. The EPR enables Sunnybrook to have a high performance team structure (domain 1), to function as an integrated organization (domain 2), and to reach out and develop new relationships with external organizations to become an extended enterprise (domain 3) [2]. Domain 1: Sunnybrook's high performance teams or patient service units' (PSUs) are decentralized, autonomous operating units that provide care to patients grouped by 'like' diagnosis and resource needs. The EPR must provide functions and applications which promote patient focused care, such as cross functional charting and care maps, group scheduling, clinical email, and a range of enabling technologies for multiskilled workers. Domain 2: In the integrated organization domain, the EPR should facilitate closer linkages between the arrangement of PSUs into clinical teams and with other facilities within the center in order to provide a longitudinal record that covers a continuum of care

  17. The electronic patient record: a strategic planning framework.

    PubMed

    Gordon, D B; Marafioti, S; Carter, M; Kunov, H; Dolan, A

    1995-01-01

    Sunnybrook Health Science Center (Sunnybrook) is a multifacility academic teaching center. In May 1994, Sunnybrook struck an electronic patient record taskforce to develop a strategic plan for the implementation of a comprehensive, facility wide electronic patient record (EPR). The taskforce sought to create a conceptual framework which provides context and integrates decision-making related to the comprehensive electronic patient record. The EPR is very much broader in scope than the traditional paper-based record. It is not restricted to simply reporting individual patient data. By the Institute of Medicine's definition, the electronic patient record resides in a system specifically designed to support users through availability of complete and accurate data, practitioner reminders and alerts, clinical decision support systems, links to bodies of medical knowledge, and other aids [1]. It is a comprehensive resource for patient care. The taskforce proposed a three domain model for determining how the EPR affects Sunnybrook. The EPR enables Sunnybrook to have a high performance team structure (domain 1), to function as an integrated organization (domain 2), and to reach out and develop new relationships with external organizations to become an extended enterprise (domain 3) [2]. Domain 1: Sunnybrook's high performance teams or patient service units' (PSUs) are decentralized, autonomous operating units that provide care to patients grouped by 'like' diagnosis and resource needs. The EPR must provide functions and applications which promote patient focused care, such as cross functional charting and care maps, group scheduling, clinical email, and a range of enabling technologies for multiskilled workers. Domain 2: In the integrated organization domain, the EPR should facilitate closer linkages between the arrangement of PSUs into clinical teams and with other facilities within the center in order to provide a longitudinal record that covers a continuum of care

  18. 78 FR 38072 - General Management Plan, Final Environmental Impact Statement, Guadalupe Mountains National Park...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ... National Park Service General Management Plan, Final Environmental Impact Statement, Guadalupe Mountains... Plan, Guadalupe Mountains National Park, Texas. DATES: The NPS will execute a Record of Decision no... CONTACT: Dennis A. V squez, Superintendent, Guadalupe Mountains National Park, HC 60, Box 400, Salt...

  19. Strategic plan for Hanford site information management

    SciTech Connect

    1994-09-01

    The Hanford Site missions are to clean up the Site, to provide scientific knowledge and technology to meet global needs, and to partner in the economic diversification of the region. To achieve these long-term missions and increase confidence in the quality of the Site`s decision making process, a dramatically different information management culture is required, consistent with US Department of Energy (DOE) mandates on increased safety, productivity, and openness at its sites. This plan presents a vision and six strategies that will move the Site toward an information management culture that will support the Site missions and address the mandates of DOE.

  20. River Protection Project (RPP) Project Management Plan

    SciTech Connect

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  1. Teaching Electronic Records Management in the Archival Curriculum

    ERIC Educational Resources Information Center

    Zhang, Jane

    2016-01-01

    Electronic records management has been incorporated into the archival curriculum in North America since the 1990s. This study reported in this paper provides a systematic analysis of the content of electronic records management (ERM) courses currently taught in archival education programs. Through the analysis of course combinations and their…

  2. Managing Dental Office Records. Student's Manual [and] Instructor's Guide.

    ERIC Educational Resources Information Center

    Graf, Sandra Kovacs

    The student's manual of this set consists of materials for use by individuals enrolled in an extension course in managing dental office records. Addressed in the individual units of the course are the following topics: clinical records, dental insurance, recall systems, inventory control, and financial records. Each unit contains some or all of…

  3. Spent Nuclear Fuel Project document control and Records Management Program Description

    SciTech Connect

    MARTIN, B.M.

    2000-05-18

    The Spent Nuclear Fuel (SNF) Project document control and records management program, as defined within this document, is based on a broad spectrum of regulatory requirements, Department of Energy (DOE) and Project Hanford and SNF Project-specific direction and guidance. The SNF Project Execution Plan, HNF-3552, requires the control of documents and management of records under the auspices of configuration control, conduct of operations, training, quality assurance, work control, records management, data management, engineering and design control, operational readiness review, and project management and turnover. Implementation of the controls, systems, and processes necessary to ensure compliance with applicable requirements is facilitated through plans, directives, and procedures within the Project Hanford Management System (PHMS) and the SNF Project internal technical and administrative procedures systems. The documents cited within this document are those which directly establish or define the SNF Project document control and records management program. There are many peripheral documents that establish requirements and provide direction pertinent to managing specific types of documents that, for the sake of brevity and clarity, are not cited within this document.

  4. IMPAC. Integrated Management Planning and Control

    SciTech Connect

    Summers, P.L.; Gould, T.M.

    1987-01-01

    IMPAC is an interactive computer information system which integrates a program-project planning system, a cost accounting system, an internal time system, and a progress reporting system. It was developed to provide a network of related data bases acclimated to centralized administrative control while allowing for widespread interactive access to the information within the network. Capability exists for daily, weekly, and monthly input of time, detailed reports by task, person, and organizational units. Direct effort and indirect and burden effort are recorded making accounting for total labor possible.

  5. Archival and Records Management Legislation and Regulations: A RAMP Study with Guidelines.

    ERIC Educational Resources Information Center

    Ketelaar, Eric

    Prepared under contract with the International Council on Archives (ICA), this study is intended to assist information policy and planning specialists; those involved in proposing, drafting and reviewing legislation and administrative regulations; and especially archivists and records managers, in creating, developing, and evaluating modern…

  6. Directory of National Standards Relating to Archives Administration and Records Management: A RAMP Study.

    ERIC Educational Resources Information Center

    Roper, Michael

    Prepared under contract with the International Council on Archives (ICA), this study is designed to provide archivists, records managers, and other interested professionals with both a reference and planning tool in the area of methods, norms and standards. The study is based on responses to a questionnaire which was submitted to selected…

  7. 77 FR 44144 - National Forest System Land Management Planning; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-27

    ... Forest Service 36 CFR Part 219 RIN 0596-AD02 National Forest System Land Management Planning; Correction...) published a National Forest System land management planning rule in the Federal Register, on April 9, 2012..., Subpart A--National Forest System Land Management Planning (36 CFR part 219, subpart A). One...

  8. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Resource management planning process. 1610.4 Section 1610.4 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF... Resource Management Planning § 1610.4 Resource management planning process....

  9. 43 CFR 1610.1 - Resource management planning guidance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... provided in 40 CFR 1502.6. The disciplines of the preparers shall be appropriate to the values involved and... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Resource management planning guidance... Resource Management Planning § 1610.1 Resource management planning guidance. (a) Guidance for...

  10. 43 CFR 1610.1 - Resource management planning guidance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... provided in 40 CFR 1502.6. The disciplines of the preparers shall be appropriate to the values involved and... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Resource management planning guidance... Resource Management Planning § 1610.1 Resource management planning guidance. (a) Guidance for...

  11. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Resource management planning process. 1610.4 Section 1610.4 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF... Resource Management Planning § 1610.4 Resource management planning process....

  12. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Resource management planning process. 1610.4 Section 1610.4 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF... Resource Management Planning § 1610.4 Resource management planning process....

  13. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and...

  14. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and...

  15. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and...

  16. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and...

  17. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... management planning. (a) From funds reserved under § 35.2020(d) the Regional Administrator shall make grants to the States to carry out water quality management planning including but not limited to:...

  18. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and...

  19. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  20. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  1. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  2. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  3. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  4. 25 CFR 700.721 - Range management plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Range management plans. 700.721 Section 700.721 Indians... Lands Grazing § 700.721 Range management plans. The Commissioner (or his designee) and the permittees of each range unit will meet as a group and develop a Range Management Plan for the common use of...

  5. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A...

  6. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A...

  7. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A...

  8. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A...

  9. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A...

  10. Role of strategic planning in engineering management

    NASA Technical Reports Server (NTRS)

    Krishen, Kumar

    1993-01-01

    Today, more than ever before, engineers are faced with uncertain and sometimes chaotic environments in which to function. The traditional roles of an engineer to design, develop, and streamline a manufacturing process for a product are still valued and relevant. However, the need for an engineer to participate in the process of identifying the product to be developed, the schedule and resources required, and the goal of satisfying the customer, has become paramount to achieving the success of the enterprise. When we include these endeavors in the functions of an engineer, management of 'engineering' takes on a new dimension. In this paper, the ramifications of the changing and increased functions of an engineer and consequent impacts on engineering management are explored. The basic principles which should be invoked in order to embrace the new environment for engineering management are outlined. The ultimate finding of this study is that the enterprise strategic plan should be developed in such a way as to allow engineering management to encompass the full spectrum of the responsibilities of engineers. A consequence of this is that the fundamental elements of the strategic process can best be implemented through a project team or group approach. The paper thus concentrates on three areas: evolving environment, strategic plan, and ways to achieve enterprise success.

  11. Site systems engineering: Systems engineering management plan

    SciTech Connect

    Grygiel, M.L.

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  12. 77 FR 38267 - Information Collection; Request for Comment; Objections to New Land Management Plans, Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF AGRICULTURE Forest Service Information Collection; Request for Comment; Objections to New Land Management Plans, Plan..., Forest Service, Attn: Chris French, Acting Assistant Director for Planning, Ecosystem...

  13. 25 CFR 163.11 - Forest management planning and sustained yield management.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Forest management planning and sustained yield management... GENERAL FORESTRY REGULATIONS Forest Management and Operations § 163.11 Forest management planning and... forest management plan shall be prepared and revised as needed for all Indian forest lands....

  14. 25 CFR 163.11 - Forest management planning and sustained yield management.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Forest management planning and sustained yield management... GENERAL FORESTRY REGULATIONS Forest Management and Operations § 163.11 Forest management planning and... forest management plan shall be prepared and revised as needed for all Indian forest lands....

  15. 25 CFR 163.11 - Forest management planning and sustained yield management.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Forest management planning and sustained yield management... GENERAL FORESTRY REGULATIONS Forest Management and Operations § 163.11 Forest management planning and... forest management plan shall be prepared and revised as needed for all Indian forest lands....

  16. 25 CFR 163.11 - Forest management planning and sustained yield management.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Forest management planning and sustained yield management... GENERAL FORESTRY REGULATIONS Forest Management and Operations § 163.11 Forest management planning and... forest management plan shall be prepared and revised as needed for all Indian forest lands....

  17. 78 FR 16296 - Record of Decision for the Coral Reef Restoration Plan, Biscayne National Park, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-14

    ... National Park Service Record of Decision for the Coral Reef Restoration Plan, Biscayne National Park, FL... the availability of the Record of Decision (ROD) for the Coral Reef Restoration Plan (Plan) for... reef restoration actions in Biscayne National Park is to create a stable, self-sustaining...

  18. Terrestrial forest management plan for Palmyra Atoll

    USGS Publications Warehouse

    Hathaway, Stacie A.; McEachern, Kathryn; Fisher, Robert N.

    2011-01-01

    This 'Terrestrial Forest Management Plan for Palmyra Atoll' was developed by the U.S. Geological Survey (USGS) for The Nature Conservancy (TNC) Palmyra Program to refine and expand goals and objectives developed through the Conservation Action Plan process. It is one in a series of adaptive management plans designed to achieve TNC's mission toward the protection and enhancement of native wildlife and habitat. The 'Terrestrial Forest Management Plan for Palmyra Atoll' focuses on ecosystem integrity and specifically identifies and addresses issues related to assessing the status and distribution of resources, as well as the pressures acting upon them, most specifically nonnative and potentially invasive species. The plan, which presents strategies for increasing ecosystem integrity, provides a framework to implement and track the progress of conservation and restoration goals related to terrestrial resources on Palmyra Atoll. The report in its present form is intended to be an overview of what is known about historical and current forest resources; it is not an exhaustive review of all available literature relevant to forest management but an attempt to assemble as much information specific to Palmyra Atoll as possible. Palmyra Atoll is one of the Northern Line Islands in the Pacific Ocean southwest of the Hawai`ian Islands. It consists of many heavily vegetated islets arranged in a horseshoe pattern around four lagoons and surrounded by a coral reef. The terrestrial ecosystem consists of three primary native vegetation types: Pisonia grandis forest, coastal strand forest, and grassland. Among these vegetation types, the health and extent of Pisonia grandis forest is of particular concern. Overall, the three vegetation types support 25 native plant species (two of which may be extirpated), 14 species of sea birds, six shore birds, at least one native reptile, at least seven native insects, and six native land crabs. Green and hawksbill turtles forage at Palmyra Atoll

  19. 31 CFR 206.6 - Cash management planning and review.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Cash management planning and review... planning and review. (a) An agency shall periodically perform cash management reviews to identify areas...) FISCAL SERVICE, DEPARTMENT OF THE TREASURY FINANCIAL MANAGEMENT SERVICE MANAGEMENT OF FEDERAL...

  20. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.

    1992-03-01

    This Project Management Plan (PMP) describes the approach that will be used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems that will be used to plan and control the HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease Control (CDC), and the Technical Steering Panel (TSP).

  1. The department manager and effective human resource planning: an overview.

    PubMed

    Arnold, Edwin; Pulich, Marcia

    2007-01-01

    Department managers in health care organizations play a pivotal role in ensuring the success of human resource (HR) planning. This article describes HR planning and its importance to the organization and department managers. Organizational support necessary for effective HR planning is also covered. The HR planning process is examined. Managerial responsibilities such as interviewing and performance appraisal and their relationship to HR planning are discussed. PMID:17314626

  2. The department manager and effective human resource planning: an overview.

    PubMed

    Arnold, Edwin; Pulich, Marcia

    2007-01-01

    Department managers in health care organizations play a pivotal role in ensuring the success of human resource (HR) planning. This article describes HR planning and its importance to the organization and department managers. Organizational support necessary for effective HR planning is also covered. The HR planning process is examined. Managerial responsibilities such as interviewing and performance appraisal and their relationship to HR planning are discussed.

  3. Geothermal energy projects - Planning and management

    SciTech Connect

    Goodman, L.J.; Love, R.N.

    1980-01-01

    A presentation is made of management requirements for the development of geothermal resources by citing three major, and successful, projects: the Wairakei geothermal power project of New Zealand, the Hawaii geothermal project of the United States, and the Tiwi geothermal project of the Philippines. The three case studies are presented according to a format in which the history of each project falls into four phases: (1) planning, appraisal and design (2) section, approval and activation (3) operation, control and handover and (4) evaluation and refinement. Each case study furnishes extensive performance and economic figures, along with consideration of such related issues as geothermal effluent chemical content, infrastructural requirements, and environmental impact.

  4. Mixed Waste Focus Area program management plan

    SciTech Connect

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal.

  5. 36 CFR 1236.10 - What records management controls must agencies establish for records in electronic information...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... controls must agencies establish for records in electronic information systems? 1236.10 Section 1236.10... ELECTRONIC RECORDS MANAGEMENT Records Management and Preservation Considerations for Designing and Implementing Electronic Information Systems § 1236.10 What records management controls must agencies...

  6. 36 CFR 1220.32 - What records management principles must agencies implement?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false What records management... ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT FEDERAL RECORDS; GENERAL Agency Records Management Responsibilities § 1220.32 What records management principles must agencies implement? Agencies must create...

  7. Environmental planning and management in Greater Johannesburg.

    PubMed

    Von Schirnding, Y E

    1996-03-01

    This article describes the actions among urban environmental, management, and development planners in Greater Johannesburg, South Africa. Initiatives, such as the Healthy Cities Project and Model Communities, are being integrated into an environmental management and development approach that attains the goals of Agenda 21. Greater Johannesburg has housing shortages and homelessness. Priority needs include the areas of housing, water, electricity, public transportation, and sanitation. Clean water and air are inequitably distributed. Other key environmental problems include illegal dumping, inadequate waste disposal, poor environmental hygiene in overcrowded inner city areas, lack of open spaces, flooding, and water scarcities. The newly formed metropolitan authority offers opportunities to improve coordination and integration of environmental problems. Stakeholders from government at all levels, politicians, nongovernmental organizations, and the business sector formed an intersectoral, interdepartmental environment management committee in 1995. Stakeholders will integrate Agenda 21 within broader urban development plans and processes. The executive committee and the full council approved a set of guiding principles on environmental policy and an administrative framework for management. Four workshops were held to ensure a participatory consultation process in 1995. The WHO Collaborating Center for Urban Health will be used to facilitate the work of the Greater Johannesburg Metropolitan Council. Changes are being made in the way local governments work.

  8. Arid Lands Ecology Facility management plan

    SciTech Connect

    1993-02-01

    The Arid Lands Ecology (ALE) facility is a 312-sq-km tract of land that lies on the western side of the Hanford Site in southcentral Washington. The US Atomic Energy Commission officially set aside this land area in 1967 to preserve shrub-steppe habitat and vegetation. The ALE facility is managed by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE) for ecological research and education purposes. In 1971, the ALE facility was designated the Rattlesnake Hills Research Natural Area (RNA) as a result of an interagency federal cooperative agreement, and remains the largest RNA in Washington. it is also one of the few remaining large tracts of shrub-steppe vegetation in the state retaining a predominant preeuropean settlement character. This management plan provides policy and implementation methods for management of the ALE facilities consistent with both US Department of Energy Headquarters and the Richland Field Office decision (US Congress 1977) to designate and manage ALE lands as an RNA and as a component of the DOE National Environmental Research Park System.

  9. HotSpot Software Configuration Management Plan

    SciTech Connect

    Walker, H; Homann, S G

    2009-03-12

    This Software Configuration Management Plan (SCMP) describes the software configuration management procedures used to ensure that the HotSpot dispersion model meets the requirements of its user base, which includes: (1) Users of the PC version of HotSpot for consequence assessment, hazard assessment and safety analysis calculations; and (2) Users of the NARAC Web and iClient software tools, which allow users to run HotSpot for consequence assessment modeling These users and sponsors of the HotSpot software and the organizations they represent constitute the intended audience for this document. This plan is intended to meet Critical Recommendations 1 and 3 from the Software Evaluation of HotSpot and DOE Safety Software Toolbox Recommendation for inclusion of HotSpot in the Department of Energy (DOE) Safety Software Toolbox. HotSpot software is maintained for the Department of Energy Office of Emergency Operations by the National Atmospheric Release Advisory Center (NARAC) at Lawrence Livermore National Laboratory (LLNL). An overview of HotSpot and NARAC are provided.

  10. Office Skills: Junk Mail: Added Dimension to Teaching Records Management

    ERIC Educational Resources Information Center

    Klemin, Wayne

    1977-01-01

    A junk mail filing simulation is described as a simple but effective approach to teaching records management. Implementation of the approach is described in sixteen steps. Eight objectives and five variations to the simulation are included. (SH)

  11. Principles of effective USA federal fire management plans

    USGS Publications Warehouse

    Meyer, Marc D.; Roberts, Susan L.; Wills, Robin; Brooks, Matthew L.; Winford, Eric M.

    2015-01-01

    Federal fire management plans are essential implementation guides for the management of wildland fire on federal lands. Recent changes in federal fire policy implementation guidance and fire science information suggest the need for substantial changes in federal fire management plans of the United States. Federal land management agencies are also undergoing land management planning efforts that will initiate revision of fire management plans across the country. Using the southern Sierra Nevada as a case study, we briefly describe the underlying framework of fire management plans, assess their consistency with guiding principles based on current science information and federal policy guidance, and provide recommendations for the development of future fire management plans. Based on our review, we recommend that future fire management plans be: (1) consistent and compatible, (2) collaborative, (3) clear and comprehensive, (4) spatially and temporally scalable, (5) informed by the best available science, and (6) flexible and adaptive. In addition, we identify and describe several strategic guides or “tools” that can enhance these core principles and benefit future fire management plans in the following areas: planning and prioritization, science integration, climate change adaptation, partnerships, monitoring, education and communication, and applied fire management. These principles and tools are essential to successfully realize fire management goals and objectives in a rapidly changing world.

  12. 25 CFR 161.203 - Are range management plans required?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...: (a) Consult with the Navajo Nation in planning conservation practices, including grazing control and range restoration activities for the Navajo Partitioned Lands. (b) Develop range management plans with the concurrence of the Navajo Nation. (c) Approve the range management plans, after concurrence...

  13. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation... agencies, develop a Program Management Plan prior to initiating a program-level activity. (2) The Program Management Plan shall define the activities, and where appropriate, the subordinate tasks, as well as...

  14. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation... agencies, develop a Program Management Plan prior to initiating a program-level activity. (2) The Program Management Plan shall define the activities, and where appropriate, the subordinate tasks, as well as...

  15. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation... agencies, develop a Program Management Plan prior to initiating a program-level activity. (2) The Program Management Plan shall define the activities, and where appropriate, the subordinate tasks, as well as...

  16. Energy Management Lesson Plans for Vocational Agriculture Instructors.

    ERIC Educational Resources Information Center

    Hedges, Lowell E., Ed.; Miller, Larry E., Ed.

    This notebook provides vocational agricultural teachers with 10 detailed lesson plans on the major topic of energy management in agriculture. The lesson plans present information about energy and the need to manage it wisely, using a problem-solving approach. Each lesson plan follows this format: lesson topic, lesson performance objectives,…

  17. 25 CFR 163.11 - Forest management planning and sustained yield management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... implementation of integrated resource management plans which provide coordination for the comprehensive management of all natural resources on Indian land. If the integrated resource management planning process... 25 Indians 1 2010-04-01 2010-04-01 false Forest management planning and sustained yield...

  18. 20 CFR 638.802 - Student records management.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Student records management. 638.802 Section... PROGRAM UNDER TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Administrative Provisions § 638.802 Student... for each student during enrollment and for the disposition of such records after termination....

  19. 20 CFR 638.802 - Student records management.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Student records management. 638.802 Section... PROGRAM UNDER TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Administrative Provisions § 638.802 Student... for each student during enrollment and for the disposition of such records after termination....

  20. Information Management Strategic Plan. Information: The fuel for success

    SciTech Connect

    Not Available

    1994-07-01

    Reliable information is key to the ultimate success of the Departmental Strategic Plan. To help ensure that success, this Information Management Strategic Plan has been developed, which evolved from and directly supports the Departmental Strategic Plan and the Human Resources and Administration Strategic Plan.

  1. A GIS planning model for urban oil spill management.

    PubMed

    Li, J

    2001-01-01

    Oil spills in industrialized cities pose a significant threat to their urban water environment. The largest city in Canada, the city of Toronto, has an average 300-500 oil spills per year with an average total volume of about 160,000 L/year. About 45% of the spills was eventually cleaned up. Given the enormous amount of remaining oil entering into the fragile urban ecosystem, it is important to develop an effective pollution prevention and control plan for the city. A Geographic Information System (GIS) planning model has been developed to characterize oil spills and determine preventive and control measures available in the city. A database of oil spill records from 1988 to 1997 was compiled and geo-referenced. Attributes to each record such as spill volume, oil type, location, road type, sector, source, cleanup percentage, and environmental impacts were created. GIS layers of woodlots, wetlands, watercourses, Environmental Sensitive Areas, and Areas of Natural and Scientific Interest were obtained from the local Conservation Authority. By overlaying the spill characteristics with the GIS layers, evaluation of preventive and control solutions close to these environmental features was conducted. It was found that employee training and preventive maintenance should be improved as the principal cause of spills was attributed to human errors and equipment failure. Additionally, the cost of using oil separators at strategic spill locations was found to be $1.4 million. The GIS model provides an efficient planning tool for urban oil spill management. Additionally, the graphical capability of GIS allows users to integrate environmental features and spill characteristics in the management analysis. PMID:11379137

  2. 25 CFR 161.203 - Are range management plans required?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... diversity; (2) Stocking rates; (3) Grazing schedules; (4) Wildlife management; (5) Needs assessment for... 25 Indians 1 2012-04-01 2011-04-01 true Are range management plans required? 161.203 Section 161... LANDS GRAZING PERMITS General Provisions § 161.203 Are range management plans required? Yes. BIA...

  3. 25 CFR 161.203 - Are range management plans required?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... diversity; (2) Stocking rates; (3) Grazing schedules; (4) Wildlife management; (5) Needs assessment for... 25 Indians 1 2013-04-01 2013-04-01 false Are range management plans required? 161.203 Section 161... LANDS GRAZING PERMITS General Provisions § 161.203 Are range management plans required? Yes. BIA...

  4. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Resource management planning process. 1610.4 Section 1610.4 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING,...

  5. FY 2014 - Stockpile and Stewardship and Management Plan

    SciTech Connect

    2013-06-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  6. Space telescope observatory management system preliminary test and verification plan

    NASA Technical Reports Server (NTRS)

    Fritz, J. S.; Kaldenbach, C. F.; Williams, W. B.

    1982-01-01

    The preliminary plan for the Space Telescope Observatory Management System Test and Verification (TAV) is provided. Methodology, test scenarios, test plans and procedure formats, schedules, and the TAV organization are included. Supporting information is provided.

  7. Paperless medical records: moving from plan to reality.

    PubMed

    Tobey, Mary Ellen

    2004-01-01

    In 2002, North Shore Magnetic Imaging Center (NSMIC) decided that a major restructuring of the patient process was necessary to alleviate staff frustration and increase the level of patient care. An aggressive, 16-month timeline was established for the center to develop and implement a paperless environment. The project began by focusing on the center's existing radiology information system (RIS). Research showed that no "canned" system would perform the necessary tasks. The center's vendor, with whom senior management had developed a longstanding and trusting relationship, assured the center that, with the proper programming, the existing RIS could support the new paperless environment. Additional technology components were addressed. The first phase enabled staff to obtain physician orders and outside reports from the fax server. Once the patient medical record was fully electronic, these external documents were no longer printed. The transfer of billing information to the radiologist's billing office was achieved through a Health-Level 7 (HL7) interface between NSMIC's RIS and the information systems utilized by the billing office. Technologists were impacted when wireless personal computer (PC) tablets were implemented. Measuring 8.5" x 11" x 0.5", these tablets enable technologists to gather and record patient information while moving freely throughout the center. Forming the Reinvention Team--an internal team of NSMIC staff that would deal with the project's impact on staff, workflow, and patient care--was done in very deliberate fashion. During the recruitment phase of the project, each prospective team member was required to take 2 specific personality profile tests. The team was comprised of a combination of different personality profiles. A radiologist was later added to the team. Throughout the implementation of new processes at NSMIC, numerous breakdowns were encountered. The breakdowns could be classified into 2 categories: technical andpatient

  8. Turn over folders: a proven tool in succession management planning.

    PubMed

    Engells, Thomas E

    2011-01-01

    The dual challenges of succession management and succession management planning are considerable. A tool, the Turn over Folder, was introduced and described in detail as a useful first step in succession management planning. The adoption of that tool will not in itself produce a succession management plan, but it will orientate the organization and its members to the reality of succession management in all important leadership and critical positions. Succession management is an important consideration in all progressive organizations and well worth the effort.

  9. Idaho National Laboratory Cultural Resource Management Plan

    SciTech Connect

    Lowrey, Diana Lee

    2009-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  10. Idaho National Laboratory Cultural Resource Management Plan

    SciTech Connect

    Julie Braun Williams

    2013-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices

  11. Idaho National Laboratory Cultural Resource Management Plan

    SciTech Connect

    Lowrey, Diana Lee

    2011-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  12. 77 FR 49016 - Notice of Availability of Record of Decision for the Pocatello Field Office Resource Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-15

    ...The Bureau of Land Management (BLM) announces the availability of the Record of Decision (ROD)/Approved Resource Management Plan (RMP) for the Pocatello Field Office located in southeastern Idaho. The Idaho State Director signed the ROD on July 10, 2012, which constitutes the final decision of the BLM and makes the Approved RMP effective...

  13. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle's contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  14. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle`s contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  15. A groundwater management plan for Stuttgart.

    PubMed

    Vasin, Sandra; Carle, Achim; Lang, Ulrich; Kirchholtes, Hermann Josef

    2016-09-01

    In general, groundwater in urban areas is exposed to anthropogenic influence and suffers from concentrations of contaminants. Stuttgart, as a highly industrialized city, has more than 5000 contaminated sites which might influence the Stuttgart's mineral water quality. Despite tremendous efforts and intensive single site orientated remediation since 1984 in downtown, the mineral springs were still affected with chlorinated hydrocarbons at low concentrations. Therefore, the applied practices of environmental management and measures for mitigation of pollution sources were not sufficient and had to be adjusted. The main goal of this study is to define an integral remediation plan (a groundwater management plan), focusing on the key sources of chlorinated solvents which are relevant for the mineral springs. For the large-scale investigated area of 26.6km(2) and eight aquifers, an extensive investigation and characterization methods were used in order to delineate the contamination plumes. By means of a 3D numerical model, the prioritization of the contaminated sites could be performed. Five contaminated sites with high remediation priority and need for optimized or additional remediation efforts were determined. For those five contaminated sites feasibility studies were performed which resulted in recommendation of remediation measures with total costs of more than 12.5 million euros. The proposed strategy and approach are suitable for multiple sources of contamination. Only in this way, the contributions of single contaminated sites to the total groundwater contamination can be identified and local remediation measures with their spatial impact simulated. Due to very complex geological conditions, technically there is no alternative to this strategy in order to achieve the contamination reduction in groundwater.

  16. Configuration management plan for the GENII software

    SciTech Connect

    Rittmann, P.D.

    1994-12-12

    The GENII program calculates doses from radionuclides released into the environment for a variety of possible exposure scenarios. The user prepares an input data file with the necessary modelling assumptions and parameters. The program reads the user`s input file, computes the necessary doses and stores these results in an output file. The output file also contains a listing of the user`s input and gives the title lines from the data libraries which are accessed in the course of the calculations. The purpose of this document is to provide users of the GENII software with the configuration controls which are planned for use by WHC in accordance with WHC-CM-3-10. The controls are solely for WHC employees. Non-WHC individuals are not excluded, but no promise is made or implied that they will be informed of errors or revisions to the software. The configuration controls cover the GENII software, the GENII user`s guide, the list of GENII users at WHC, and the backup copies. Revisions to the software must be approved prior to distribution in accordance with this configuration management plan.

  17. 36 CFR 1220.30 - What are an agency's records management responsibilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... program for the economical and efficient management of the records of the agency. (c) Agency records... management responsibilities? 1220.30 Section 1220.30 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT FEDERAL RECORDS; GENERAL Agency Records...

  18. Health professional's role in disaster planning: a strategic management approach.

    PubMed

    Meyer, M U; Graeter, C J

    1995-05-01

    1. The Strategic Management for Total Quality in Health Care model incorporates strategic management methods and total quality principles to enhance management of complex, interdisciplinary projects. 2. The purpose of disaster planning is to provide an effective and efficient plan to prevent personal injury and limit property damage and capital losses, as well as return to full production after a disaster. 3. Participation in disaster response planning provides health professionals with an opportunity to demonstrate the benefits they can provide for meeting their company's business needs. 4. Disaster planning is a complex, interdisciplinary project that requires a strategic management framework to facilitate development of high quality, cost effective programs.

  19. 36 CFR 1236.22 - What are the additional requirements for managing electronic mail records?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements for managing electronic mail records? 1236.22 Section 1236.22 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT Additional Requirements for Electronic Records § 1236.22 What are the additional requirements for managing electronic...

  20. 36 CFR 1236.22 - What are the additional requirements for managing electronic mail records?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requirements for managing electronic mail records? 1236.22 Section 1236.22 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT Additional Requirements for Electronic Records § 1236.22 What are the additional requirements for managing electronic...

  1. 36 CFR 1236.6 - What are agency responsibilities for electronic records management?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... responsibilities for electronic records management? 1236.6 Section 1236.6 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT General § 1236.6 What are agency responsibilities for electronic records management? Agencies must:...

  2. 36 CFR 1236.22 - What are the additional requirements for managing electronic mail records?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements for managing electronic mail records? 1236.22 Section 1236.22 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT Additional Requirements for Electronic Records § 1236.22 What are the additional requirements for managing electronic...

  3. 36 CFR 1236.6 - What are agency responsibilities for electronic records management?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... responsibilities for electronic records management? 1236.6 Section 1236.6 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT General § 1236.6 What are agency responsibilities for electronic records management? Agencies must:...

  4. 36 CFR 1236.22 - What are the additional requirements for managing electronic mail records?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... requirements for managing electronic mail records? 1236.22 Section 1236.22 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT Additional Requirements for Electronic Records § 1236.22 What are the additional requirements for managing electronic...

  5. 36 CFR 1236.6 - What are agency responsibilities for electronic records management?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... responsibilities for electronic records management? 1236.6 Section 1236.6 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT General § 1236.6 What are agency responsibilities for electronic records management? Agencies must:...

  6. 36 CFR 1236.6 - What are agency responsibilities for electronic records management?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... responsibilities for electronic records management? 1236.6 Section 1236.6 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT General § 1236.6 What are agency responsibilities for electronic records management? Agencies must:...

  7. Technical Assistance Contractor management plan. Revision 1

    SciTech Connect

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  8. Hanford Sampling Quality Management Plan (HSQMP)

    SciTech Connect

    Hyatt, J.E.

    1995-04-28

    This document provides a management tool for evaluating and designing the appropriate elements of a field sampling program. This document provides discussion of the elements of a program and is to be used as a guidance document during the preparation of project and/or function specific documentation. This document does not specify how a sampling program shall be organized. The HSQMP is to be used as a companion document to the Hanford Analytical Services Quality Assurance Plan (HASQAP) DOE/RL-94-55. The generation of this document was enhanced by conducting baseline evaluations of current sampling organizations. Valuable input was received from members of field and Quality Assurance organizations. The HSQMP is expected to be a living document. Revisions will be made as regulations and or Hanford Site conditions warrant changes in the best management practices. Appendices included are: summary of the sampling and analysis work flow process, a user`s guide to the Data Quality Objective process, and a self-assessment checklist.

  9. Environmental Restoration and Waste Management: Strategic plan

    SciTech Connect

    Not Available

    1994-09-01

    The Brookhaven National Laboratory (BNL) site is currently divided into five major areas, Operable Units (OUs), and several Areas of Concern (AOCs), which are the focus of investigation and clean-up. The primary environmental concern is groundwater contamination and a major emphasis of the restoration activities is focused on this medium. Each year, BNL generates 60 tons of hazardous waste and 7,000 to 8,000 cubic feet of radioactive waste that result from research activities. These wastes are collected at a central location, packaged and shipped off site for disposal. The operations for Hazardous and Radioactive Waste Management are conducted in compliance with EPA and DOE regulations. BNL has continued to actively pursue means by which these wastes may be minimized. Activities in both the remediation and waste management arenas are intimately connected with the future vision of BNL. The long-range goal for remediation in conjunction with vigorous monitoring of BNL`s activities is to restore the site and maintain strong environmental controls. The goals of the waste minimization program include activities to find environmentally safe alternatives to materials currently in use. By careful planning, BNL will minimize the amount of all waste, including sanitary, that is generated on site.

  10. 36 CFR 1236.10 - What records management controls must agencies establish for records in electronic information...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Implementing Electronic Information Systems § 1236.10 What records management controls must agencies establish for records in electronic information systems? The following types of records management controls are... controls must agencies establish for records in electronic information systems? 1236.10 Section...

  11. 36 CFR 1236.10 - What records management controls must agencies establish for records in electronic information...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementing Electronic Information Systems § 1236.10 What records management controls must agencies establish for records in electronic information systems? The following types of records management controls are... 36 Parks, Forests, and Public Property 3 2013-07-01 2012-07-01 true What records...

  12. Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan

    SciTech Connect

    Parr, P.D.; Evans, J.W.

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.

  13. 43 CFR 1610.1 - Resource management planning guidance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... provided in 40 CFR 1502.6. The disciplines of the preparers shall be appropriate to the values involved and... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING,...

  14. 43 CFR 1610.1 - Resource management planning guidance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... provided in 40 CFR 1502.6. The disciplines of the preparers shall be appropriate to the values involved and... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING,...

  15. Cost accounting, management control, and planning in health care.

    PubMed

    Siegrist, R B; Blish, C S

    1988-02-01

    Advantages and pharmacy applications of computerized hospital management-control and planning systems are described. Hospitals must define their product lines; patient cases, not tests or procedures, are the end product. Management involves operational control, management control, and strategic planning. Operational control deals with day-to-day management on the task level. Management control involves ensuring that managers use resources effectively and efficiently to accomplish the organization's objectives. Management control includes both control of unit costs of intermediate products, which are procedures and services used to treat patients and are managed by hospital department heads, and control of intermediate product use per case (managed by the clinician). Information from the operation and management levels feeds into the strategic plan; conversely, the management level controls the plan and the operational level carries it out. In the system developed at New England Medical Center, Boston, Massachusetts, the intermediate product-management system enables managers to identify intermediate products, develop standard costs, simulate changes in departmental costs, and perform variance analysis. The end-product management system creates a patient-level data-base, identifies end products (patient-care groupings), develops standard resource protocols, models alternative assumptions, performs variance analysis, and provides concurrent reporting. Examples are given of pharmacy managers' use of such systems to answer questions in the areas of product costing, product pricing, variance analysis, productivity monitoring, flexible budgeting, modeling and planning, and comparative analysis.(ABSTRACT TRUNCATED AT 250 WORDS) PMID:3284338

  16. Information System Development: Phase I, Management Planning.

    ERIC Educational Resources Information Center

    Woods, Bill M.

    Objectives of this study of the operations of Engineering Index were to: (1) determine the need for a planning capability, (2) blueprint a mechanism to accomplish planning, and (3) recommend priorities requiring planning attention. Topics considered in the study are planning, the role of the board of directors and trustees, organizational…

  17. 78 FR 63491 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... this announcement, Water Management Plans (Plans) are considered the same as Water Conservation Plans... water conservation best management practices that shall ``develop criteria for evaluating the ] adequacy of all water conservation plans developed by project contractors, including those plans required...

  18. 40 CFR 91.905 - Reports, voluntary recall plan filing, record retention.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Reports, voluntary recall plan filing... Defect Reporting Requirements, Voluntary Emission Recall Program § 91.905 Reports, voluntary recall plan filing, record retention. (a) The defect report, voluntary recall plan, and the voluntary recall...

  19. 40 CFR 91.905 - Reports, voluntary recall plan filing, record retention.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Reports, voluntary recall plan filing... Defect Reporting Requirements, Voluntary Emission Recall Program § 91.905 Reports, voluntary recall plan filing, record retention. (a) The defect report, voluntary recall plan, and the voluntary recall...

  20. 40 CFR 91.905 - Reports, voluntary recall plan filing, record retention.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Reports, voluntary recall plan filing... Defect Reporting Requirements, Voluntary Emission Recall Program § 91.905 Reports, voluntary recall plan filing, record retention. (a) The defect report, voluntary recall plan, and the voluntary recall...

  1. 40 CFR 91.905 - Reports, voluntary recall plan filing, record retention.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Reports, voluntary recall plan filing... Defect Reporting Requirements, Voluntary Emission Recall Program § 91.905 Reports, voluntary recall plan filing, record retention. (a) The defect report, voluntary recall plan, and the voluntary recall...

  2. 40 CFR 91.905 - Reports, voluntary recall plan filing, record retention.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Reports, voluntary recall plan filing... Defect Reporting Requirements, Voluntary Emission Recall Program § 91.905 Reports, voluntary recall plan filing, record retention. (a) The defect report, voluntary recall plan, and the voluntary recall...

  3. Formulation of consumables management models: Test plan for the mission planning processor working model

    NASA Technical Reports Server (NTRS)

    Connelly, L. C.

    1977-01-01

    The test plan and test procedures to be used in the verification and validation of the software being implemented in the mission planning processor working model program are documented. The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. An overview of the working model is presented. Execution of the test plan will comprehensively exercise the working model software. An overview of the test plan, including a testing schedule, is presented along with the test plan for the unit, module, and system levels. The criteria used to validate the working model results for each consumables subsystem is discussed.

  4. A Systems Approach to the Planning and Formulation of Technology Augmented Programs for Management Education.

    ERIC Educational Resources Information Center

    Burke, Thomas Edward

    A management education planning approach called Computer-Assisted Subject Area (CASA) has been conceptualized as a framework for viewing, evaluating, and recording efforts to improve the effectiveness of a subject area to be integrated within an overall curriculum. CASA is a generalized set of models which feature a hierarchy of activities in…

  5. 77 FR 30320 - General Management Plan/Environmental Impact Statement, Ross Lake National Recreation Area, North...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... National Park Service General Management Plan/Environmental Impact Statement, Ross Lake National Recreation Area, North Cascades National Park Service Complex, Skagit and Whatcom Counties, WA AGENCY: National... Department of the Interior, National Park Service (NPS) has prepared and approved a Record of Decision...

  6. Succession planning for RNs: implementing a nurse management internship.

    PubMed

    Wendler, M Cecilia; Olson-Sitki, Kristi; Prater, Marsha

    2009-01-01

    The nursing shortage affects all levels, including the pivotal role of nurse managers, who may find themselves functioning in a complex, stressful work environment. In this increasingly difficult milieu, succession planning for nurse manager turnover is imperative. The authors describe an evidence-based, theoretically driven nurse management internship that allows staff nurses to explore the nurse manager role.

  7. Optimizing Curriculum Planning in Site-Based Management.

    ERIC Educational Resources Information Center

    Stewart, William J.

    1997-01-01

    Examines why curriculum planning falls short in site-based management and what can be done about it. Alternative curriculum-planning strategies include holistic planning, construction of thematic units to suit students' individual differences, and a multifaceted, cross-functional approach. Adapting corporate innovations and pursuing strategic…

  8. The Educational Value of a Wildlife and Landscape Management Plan.

    ERIC Educational Resources Information Center

    Young, S. W.; And Others

    1987-01-01

    Presents a wildlife and landscape management plan that was developed for the British College of Agriculture farm. Discusses the economic value and the educational value of wildlife plans. Proposes that such wildlife conservation plans be developed for other farmlands in Great Britain. (TW)

  9. The Marketing Plan: An Integrative Device for Teaching Marketing Management.

    ERIC Educational Resources Information Center

    Berdine, W. R.; Petersen, James C.

    1980-01-01

    The importance of the marketing plan is stressed as an integrative device for teaching marketing management, and a structure is presented to assist students in designing a marketing plan. Components of this plan include marketing objectives, targeting market and buying motives, external environment and competition, product, price, and promotion.…

  10. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan...

  11. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to:...

  12. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan...

  13. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to:...

  14. 40 CFR 262.214 - Laboratory management plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Laboratory management plan. 262.214... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain...

  15. 40 CFR 262.214 - Laboratory management plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Laboratory management plan. 262.214... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain...

  16. 40 CFR 262.214 - Laboratory management plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Laboratory management plan. 262.214... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain...

  17. 40 CFR 262.214 - Laboratory management plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Laboratory management plan. 262.214... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain...

  18. 40 CFR 60.55c - Waste management plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., glass, batteries, food waste, and metals (e.g., aluminum cans, metals-containing devices); segregation... 40 Protection of Environment 7 2014-07-01 2014-07-01 false Waste management plan. 60.55c Section...: Hospital/Medical/Infectious Waste Incinerators § 60.55c Waste management plan. The owner or operator of...

  19. 40 CFR 60.55c - Waste management plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., glass, batteries, food waste, and metals (e.g., aluminum cans, metals-containing devices); segregation... 40 Protection of Environment 7 2013-07-01 2013-07-01 false Waste management plan. 60.55c Section...: Hospital/Medical/Infectious Waste Incinerators § 60.55c Waste management plan. The owner or operator of...

  20. Uranium Mill Tailings Remedial Action Project surface project management plan

    SciTech Connect

    Not Available

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

  1. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... management planning. Before grant assistance can be awarded for any treatment works project, the Regional... under sections 303(e) and 305(b) of the Act....

  2. 78 FR 59911 - Generic Information Collection for Land Management Planning

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... example of a communication strategy that could be supported by this generic ICR would be the solicitation... Forest Service Generic Information Collection for Land Management Planning AGENCY: Forest Service, USDA... information collection, Generic Information Collection for Land Management Planning. DATES: Comments must...

  3. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan...

  4. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to:...

  5. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Water quality management planning. 35.2023 Section 35.2023 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality management planning. (a) From...

  6. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Water quality management planning. 35.2102 Section 35.2102 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality management planning. Before...

  7. EMAP information management strategic plan: 1993-1997. Project report

    SciTech Connect

    Shepanek, R.F.

    1994-03-01

    The Information Management Strategic Plan for the Environmental Monitoring and Assessment Program (EMAP) describes how EMAP information will be managed from field sampling through the delivery of products to the user. This plan cuts across the entire EMAP program and explains the process for developing an information management infrastructure which will enable EMAP to achieve its long-term objectives. The Plan provides a strategy for meeting hardware, software, documentation support, and system designs that will meet EMAP Resource and Coordinating Group requirements. Users of EMAP data and information are discussed in the Plan as well as the process and technology with which they can access EMAP data and other data sources.

  8. Centralised versus decentralised management of patients' medical records.

    PubMed

    Quantin, Catherine; Coatrieux, Gouenou; Fassa, Maniane; Breton, Vincent; Jaquet-Chiffelle, David-Olivier; de Vlieger, Paul; Lypszyc, Norbert; Boire, Jean-Yves; Roux, Christian; Allaert, François-André

    2009-01-01

    For more than 20 years, many countries have been trying to set up a standardised medical record at the regional or at the national level. Most of them have not reached this goal, essentially due to two main difficulties related to patient identification and medical records standardisation. Moreover, the issues raised by the centralisation of all gathered medical data have to be tackled particularly in terms of security and privacy. We discuss here the interest of a non-centralised management of medical records which would require a specific procedure that gives to the patient access to his/her distributed medical data, wherever he/she is located.

  9. 41 CFR 102-193.20 - What are the specific agency responsibilities for records management?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT... and NARA regulations in 36 CFR chapter XII to carry out your records management responsibilities. To... agencywide records management programs to an office of the agency and to a qualified records manager....

  10. Program Planning Concepts in Solid Waste Management

    ERIC Educational Resources Information Center

    Brown, Sanford M., Jr.

    1972-01-01

    Presents a brief review of the program planning process, and uses the example of a solid waste program to illustrate what has or has not been accomplished through the use of the planning process. (LK)

  11. Space station human productivity study. Volume 5: Management plans

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The 67 Management Plans represent recommended study approaches for resolving 108 of the 305 Issues which were identified. Each study Management Plan is prepared in three formats: Management Plan Overview (lists the subsumed Issues, study background, and related overview information); Study Plan (details the study approach by tasks, lists special needs, and describes expected study products); Schedule-Task Flow (provides a time-lined schedule for the study tasks and resource requirements). The Management Relationships Matrix, included in this volume, shows the data input-output relationships among all recommended studies. A listing is also included which cross-references the unresolved requirements to Issues to management plans. A glossary of all abbreviations utilized is provided.

  12. 36 CFR 1220.32 - What records management principles must agencies implement?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false What records management principles must agencies implement? 1220.32 Section 1220.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT FEDERAL RECORDS; GENERAL Agency Records Management Responsibilities § 1220.32 What...

  13. 36 CFR 1220.32 - What records management principles must agencies implement?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false What records management principles must agencies implement? 1220.32 Section 1220.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT FEDERAL RECORDS; GENERAL Agency Records Management Responsibilities § 1220.32 What...

  14. 36 CFR 1220.32 - What records management principles must agencies implement?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 3 2013-07-01 2012-07-01 true What records management principles must agencies implement? 1220.32 Section 1220.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT FEDERAL RECORDS; GENERAL Agency Records Management Responsibilities § 1220.32 What...

  15. 36 CFR 1220.32 - What records management principles must agencies implement?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false What records management principles must agencies implement? 1220.32 Section 1220.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT FEDERAL RECORDS; GENERAL Agency Records Management Responsibilities § 1220.32 What...

  16. 36 CFR 1220.10 - Who is responsible for records management?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... guidance. Subpart B of this part sets forth basic agency records management requirements. ... records management? 1220.10 Section 1220.10 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT FEDERAL RECORDS; GENERAL § 1220.10 Who is responsible...

  17. 36 CFR 1236.24 - What are the additional requirements for managing unstructured electronic records?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for managing unstructured electronic records? 1236.24 Section 1236.24 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT Additional Requirements for Electronic Records § 1236.24 What are the additional requirements for...

  18. Configuration Management Plan for the Tank Farm Contractor

    SciTech Connect

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  19. Do self-management plans reduce morbidity in patients with asthma?

    PubMed Central

    Hoskins, G; Neville, R G; Smith, B; Clark, R A

    1996-01-01

    BACKGROUND: Self-management plans may help patients with asthma intervene when symptoms deteriorate, thus preventing asthma attacks. AIM: A study set out to test whether a self-management plan tailored to the circumstances of the individual reduces morbidity from asthma. METHOD: General practitioners who had participated in a national audit of asthma attacks were randomized into intervention and control groups. Six months after the intervention group had issued self-management plans to patients with asthma, both groups of practitioners completed morbidity questionnaires on patients. Morbidity outcomes were compared for the 6-month periods before and after the issue of the plans. RESULTS: In the 6 months before the study, the 376 patients enrolled by the intervention group experienced higher levels of morbidity than the 530 patients for whom details were recorded by the control group. In the 6 months after the issue of the plans, control group patients showed little change in levels of morbidity, but intervention group patients showed significant reductions in hospital admissions, consultations for asthma symptoms, asthma review consultations, courses of oral steroids and use of emergency nebulized bronchodilators. CONCLUSION: General practitioners appeared to operate enthusiast bias' and issued more self-management plans to patients with uncontrolled asthma. The reduction in morbidity in this group is probably a result of the use of the plans, but the verdict on whether plans reduce morbidity must be deemed 'not proven'. PMID:8731624

  20. Data management and processing plan, Department of Applied Geodesy

    SciTech Connect

    Not Available

    1992-08-01

    This plan outlines Data Management and Data Processing requirements of the Department of Applied Geodesy (DAG) and presents the plan to meet these requirements (These requirements are derived from the functional needs of the Department to meet the SSCL alignment tolerances and schedules). In addition, this document presents a schedule for the implementation of this plan. This document is an integral part of the Alignment Plan of the SSCL.

  1. Managing Strategic and Long-Range Planning via a Proactive, User-Friendly Planning Document.

    ERIC Educational Resources Information Center

    Dailey, Anne Louise; And Others

    1991-01-01

    A computerized method for managing institutional information to use in creating college planning documents is described. Development of the database, manipulation of the data for reporting, uses in strategic and long-range planning, and the model's implications for improvement of planning processes are discussed. (MSE)

  2. The Con Edison Emergency Child Care Plan for Management Employees: Summary Plan Description.

    ERIC Educational Resources Information Center

    Consolidated Edison Co., Brooklyn, NY.

    This summary plan description offers guidelines for participation in a pilot program that provides short-term emergency care for children of Con Edison managers who are under 13 years old. The plan offers professional, in-home child care that can be used when usual arrangements have collapsed. The summary plan description addresses the following…

  3. 36 CFR 219.14 - Decision document and planning records.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... amendment, or revision in a decision document prepared according to Forest Service NEPA procedures (36 CFR... the plan components meet the sustainability requirements of § 219.8, the diversity requirements...

  4. 36 CFR 219.14 - Decision document and planning records.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... amendment, or revision in a decision document prepared according to Forest Service NEPA procedures (36 CFR... the plan components meet the sustainability requirements of § 219.8, the diversity requirements...

  5. 36 CFR 219.14 - Decision document and planning records.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... amendment, or revision in a decision document prepared according to Forest Service NEPA procedures (36 CFR... the plan components meet the sustainability requirements of § 219.8, the diversity requirements...

  6. Supporting Information Governance through Records and Information Management. Research Bulletin

    ERIC Educational Resources Information Center

    Kaczmarek, Joanne

    2014-01-01

    The expanding scope of IT initiatives in higher education institutions now goes well beyond basic desktop and enterprise applications. IT is often asked to focus on efforts to establish good information-governance practices. The many aspects of information governance are often found in a records and information management (RIM) program, but not…

  7. 20 CFR 638.802 - Student records management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 638.802 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR JOB CORPS PROGRAM UNDER TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Administrative Provisions § 638.802 Student records management. The Job Corps Director shall develop guidelines for a system of maintaining...

  8. An "Academic" Dilemma: The Tale of Archives and Records Management

    ERIC Educational Resources Information Center

    Shepherd, Elizabeth

    2012-01-01

    This article discusses the development of academic research in the archives and records management field. It is argued that the field has faced a dilemma between educating graduates for work in a professional domain and developing robust research methods and frameworks for the emerging academic discipline. The article reports on some projects…

  9. 7 CFR 25.606 - Financial management and records.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... requirements of 7 CFR parts 3015, 3016, or 3019, as applicable, grantees must submit, in lieu of the forms... 7 Agriculture 1 2014-01-01 2014-01-01 false Financial management and records. 25.606 Section 25.606 Agriculture Office of the Secretary of Agriculture RURAL EMPOWERMENT ZONES AND...

  10. 7 CFR 25.606 - Financial management and records.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... requirements of 7 CFR parts 3015, 3016, or 3019, as applicable, grantees must submit, in lieu of the forms... 7 Agriculture 1 2012-01-01 2012-01-01 false Financial management and records. 25.606 Section 25.606 Agriculture Office of the Secretary of Agriculture RURAL EMPOWERMENT ZONES AND...

  11. 7 CFR 25.606 - Financial management and records.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... requirements of 7 CFR parts 3015, 3016, or 3019, as applicable, grantees must submit, in lieu of the forms... 7 Agriculture 1 2010-01-01 2010-01-01 false Financial management and records. 25.606 Section 25.606 Agriculture Office of the Secretary of Agriculture RURAL EMPOWERMENT ZONES AND...

  12. 7 CFR 25.606 - Financial management and records.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... requirements of 7 CFR parts 3015, 3016, or 3019, as applicable, grantees must submit, in lieu of the forms... 7 Agriculture 1 2011-01-01 2011-01-01 false Financial management and records. 25.606 Section 25.606 Agriculture Office of the Secretary of Agriculture RURAL EMPOWERMENT ZONES AND...

  13. 7 CFR 25.606 - Financial management and records.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... requirements of 7 CFR parts 3015, 3016, or 3019, as applicable, grantees must submit, in lieu of the forms... 7 Agriculture 1 2013-01-01 2013-01-01 false Financial management and records. 25.606 Section 25.606 Agriculture Office of the Secretary of Agriculture RURAL EMPOWERMENT ZONES AND...

  14. A Question Managing Suite for Automatic Lecture Recording

    ERIC Educational Resources Information Center

    Lampi, Fleming; Lemelson, Hendrik; Kopf, Stephan; Effelsberg, Wolfgang

    2009-01-01

    Purpose: The purpose of this paper is describing the seamless integration of the question-answer interaction into automatic lecture recordings (ALRs). This includes the design and implementation of the question management (QM) software for a virtual camera team. Design/methodology/approach: Coming from the human role model the interaction and its…

  15. Modern Archives Administration and Records Management: A RAMP Reader.

    ERIC Educational Resources Information Center

    Walne, Peter, Comp.

    This reader is intended to supplement existing textbooks and instructional materials in both introductory and advanced courses for archivists, records managers, and other information specialists. Although the articles and reports selected for inclusion necessarily reflect various international concepts emerging from administrative traditions and…

  16. 10 CFR 719.13 - Who at the Department receives and reviews the Legal Management Plan?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Management Plan? 719.13 Section 719.13 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan, Staffing and Resource Plan and Annual Legal Budget § 719.13 Who at the Department receives and reviews the Legal Management Plan? Contractors must submit a Legal Management Plan...

  17. Tank waste remediation system configuration management implementation plan

    SciTech Connect

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.

  18. Manager's assistant systems for space system planning

    NASA Technical Reports Server (NTRS)

    Bewley, William L.; Burnard, Robert; Edwards, Gary E.; Shoop, James

    1992-01-01

    This paper describes a class of knowledge-based 'assistant' systems for space system planning. Derived from technology produced for the DARPA/USAF Pilot's Associate program, these assistant systems help the human planner by doing the bookkeeping to maintain plan data and executing the procedures and heuristics currently used by the human planner to define, assess, diagnose, and revise plans. Intelligent systems for Space Station Freedom assembly sequence planning and Advanced Launch System modeling will be presented as examples. Ongoing NASA-funded work on a framework supporting the development of such tools will also be described.

  19. 40 CFR 52.1395 - Smoke management plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Smoke management plan. 52.1395 Section 52.1395 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Department considers smoke management techniques for agriculture and forestry management burning purposes...

  20. 40 CFR 52.1395 - Smoke management plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Smoke management plan. 52.1395 Section 52.1395 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Department considers smoke management techniques for agriculture and forestry management burning purposes...

  1. Los Alamos National Laboratory emergency management plan. Revision 1

    SciTech Connect

    Ramsey, G.F.

    1998-07-15

    The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents, transportation accidents, electrical accidents, and natural disasters.

  2. Natural Resource Management Plan for Brookhaven National Laboratory

    SciTech Connect

    green, T.

    2011-08-15

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in

  3. A fiduciary's guide to retirement plan management.

    PubMed

    Dingler, F J

    1991-01-01

    Most group practices have a retirement plan as part of their benefit package. However, groups have responsibilities well beyond funding to keep the plan qualified and in good standing with regulatory agencies. An additional complication is the federal government's frequent changes in the qualified pension laws. With these changes, compliance has become more complex and confusing.

  4. 40 CFR 90.805 - Reports, voluntary recall plan filing, record retention.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Reports, voluntary recall plan filing... KILOWATTS Emission-Related Defect Reporting Requirements, Voluntary Emission Recall Program, Ordered Recalls § 90.805 Reports, voluntary recall plan filing, record retention. (a) Send the defect report,...

  5. 40 CFR 90.805 - Reports, voluntary recall plan filing, record retention.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Reports, voluntary recall plan filing... KILOWATTS Emission-Related Defect Reporting Requirements, Voluntary Emission Recall Program, Ordered Recalls § 90.805 Reports, voluntary recall plan filing, record retention. (a) Send the defect report,...

  6. 40 CFR 90.805 - Reports, voluntary recall plan filing, record retention.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Reports, voluntary recall plan filing... KILOWATTS Emission-Related Defect Reporting Requirements, Voluntary Emission Recall Program, Ordered Recalls § 90.805 Reports, voluntary recall plan filing, record retention. (a) Send the defect report,...

  7. 40 CFR 90.805 - Reports, voluntary recall plan filing, record retention.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Reports, voluntary recall plan filing... KILOWATTS Emission-Related Defect Reporting Requirements, Voluntary Emission Recall Program, Ordered Recalls § 90.805 Reports, voluntary recall plan filing, record retention. (a) Send the defect report,...

  8. 40 CFR 90.805 - Reports, voluntary recall plan filing, record retention.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Reports, voluntary recall plan filing... KILOWATTS Emission-Related Defect Reporting Requirements, Voluntary Emission Recall Program, Ordered Recalls § 90.805 Reports, voluntary recall plan filing, record retention. (a) Send the defect report,...

  9. 77 FR 74027 - Winter Use Plan, Final Environmental Impact Statement Amended Record of Decision, Yellowstone...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-12

    ..., Yellowstone National Park, Idaho, Montana, and Wyoming AGENCY: National Park Service, Interior. ACTION: Notice... Winter Use Plan, Yellowstone National Park. SUMMARY: Pursuant to Sec. 102(2)(C) of the National... availability of the Amended Record of Decision for the Winter Use Plan for Yellowstone National Park,...

  10. 77 FR 56671 - Draft Shoreline Restoration Management Plan and Environmental Impact Statement for Indiana Dunes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ... National Park Service Draft Shoreline Restoration Management Plan and Environmental Impact Statement for... Restoration Management Plan and Environmental Impact Statement, Indiana Dunes National Lakeshore, Indiana. DATES: The Draft Shoreline Restoration Management Plan and Environmental Impact Statement (SRMP) will...

  11. 10. Fifth floor plan,published in 'Architectural Record',Vol 31,No. 4, April ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Fifth floor plan,published in 'Architectural Record',Vol 31,No. 4, April 1912,p. 356 (?),courtesy of Art Institute of Chicago, permission to duplicate courtesy of 'Architectural Record' - Chicago City Hall, 121 North LaSalle Street, Chicago, Cook County, IL

  12. 9. First floor plan,published in 'Architectural Record',Vol 31,No. 4, April ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. First floor plan,published in 'Architectural Record',Vol 31,No. 4, April 1912,p 356,courtesy of the Art Institute of Chicago,permission to duplicate courtesy of'Architectural Record' - Chicago City Hall, 121 North LaSalle Street, Chicago, Cook County, IL

  13. Finance and supply management project execution plan

    SciTech Connect

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  14. Social Impact Management Plans: Innovation in corporate and public policy

    SciTech Connect

    Franks, Daniel M.; Vanclay, Frank

    2013-11-15

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community.

  15. 76 FR 41814 - Notice of Intent To Prepare an Amendment to the 1985 Wells Resource Management Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... is completed and a record of decision is issued (71 FR 77:20725, April 21, 2006). The BLM is also... Spruce Mountain Area and Associated Environmental Assessment, Nevada AGENCY: Bureau of Land Management... Resource Management Plan (RMP) for recreation in the Spruce Mountain Area and prepare an...

  16. 75 FR 75546 - Financial Management Service; Privacy Act of 1974, as Amended; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-03

    ... Financial Management Service; Privacy Act of 1974, as Amended; System of Records AGENCY: Financial... Records. Treasury/FMS .008 System Name: Mailing List Records--Treasury/Financial Management Service. System Location: Records are located at the offices of Financial Management Service, 401 14th Street,...

  17. 36 CFR 1237.10 - How must agencies manage their audiovisual, cartographic, and related records?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... their audiovisual, cartographic, and related records? 1237.10 Section 1237.10 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT AUDIOVISUAL, CARTOGRAPHIC, AND RELATED RECORDS MANAGEMENT § 1237.10 How must agencies manage their audiovisual, cartographic, and...

  18. 36 CFR 1236.12 - What other records management and preservation considerations must be incorporated into the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... planning and systems development life cycle processes, agencies must ensure: (a) That records management... be retrievable and usable for as long as needed to conduct agency business (i.e., for their NARA.... (d) Provision of a standard interchange format (e.g., ASCII or XML) when needed to permit...

  19. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    SciTech Connect

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  20. 51. Roof plans, General Services Administration, Construction Management Division, Region ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Roof plans, General Services Administration, Construction Management Division, Region 2, New York, October 29, 1976. Scale 1/31=1. - U.S. Navy Fleet Supply Base, Storehouse No. 1, 830 Third Avenue, Brooklyn, Kings County, NY

  1. Management plan -- Multi-Function Waste Tank Facility. Revision 1

    SciTech Connect

    Fritz, R.L.

    1995-01-11

    This Westinghouse Hanford Company (WHC) Multi-Function Waste Tank Facility (MWTF) Management Plan provides guidance for execution WHC MWTF Project activities related to design, procurement, construction, testing, and turnover. This Management Plan provides a discussion of organizational responsibilities, work planning, project management systems, quality assurance (QA), regulatory compliance, personnel qualifications and training, and testing and evaluations. Classified by the US Department of Energy (DOE) as a major systems acquisition (MSA), the MWTF mission is to provide a safe, cost-effective, and environmentally sound method for interim storage of Hanford Site high-level wastes. This Management Plan provides policy guidance and direction to the Project Office for execution of the project activities.

  2. Managed Care Plans: Getting Good Care for Your Child

    MedlinePlus

    ... AAP Find a Pediatrician Family Life Medical Home Health Insurance Pediatric Specialists Family Dynamics Media Work & Play Getting ... Your Community Healthy Children > Family Life > Medical Home > Health Insurance > Managed Care Plans: Getting Good Care for Your ...

  3. Comparison of the NCRA and NAACCR Strategic Management Plans.

    PubMed

    Menck, Herman R

    2012-01-01

    The Strategic Management Plans of the National Cancer Registrars Association (NCRA) and the North American Association of Central Cancer Registries (NAACCR) were compared, and differences noted. No uncovered subject areas were found.

  4. Nurse manager residency program: an innovative leadership succession plan.

    PubMed

    Watkins, Amy; Wagner, Jennifer; Martin, Christina; Grant, Brandy; Maule, Katrina; Resh, Kimberly; King, Lisa; Eaton, Holly; Fetter, Katrina; King, Stacey L; Thompson, Elizabeth J

    2014-01-01

    To ensure succession planning within the ranks of nurse managers meet current and projected nursing management needs and organizational goals, we developed and implemented a nurse manager residency program at our hospital. By identifying, supporting, and mentoring clinical experts who express a desire and display an aptitude for nursing leadership, we are graduating individuals who can transition to a nurse manager position with greater ease and competence.

  5. Nurse manager residency program: an innovative leadership succession plan.

    PubMed

    Watkins, Amy; Wagner, Jennifer; Martin, Christina; Grant, Brandy; Maule, Katrina; Resh, Kimberly; King, Lisa; Eaton, Holly; Fetter, Katrina; King, Stacey L; Thompson, Elizabeth J

    2014-01-01

    To ensure succession planning within the ranks of nurse managers meet current and projected nursing management needs and organizational goals, we developed and implemented a nurse manager residency program at our hospital. By identifying, supporting, and mentoring clinical experts who express a desire and display an aptitude for nursing leadership, we are graduating individuals who can transition to a nurse manager position with greater ease and competence. PMID:24704735

  6. 36 CFR 1222.32 - How do agencies manage records created or received by contractors?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT CREATION AND MAINTENANCE OF FEDERAL RECORDS...) (48 CFR parts 200-299). (2) Records management oversight of contract records is necessary to ensure... contractors or non-Government entities participating in the National Industrial Security Program...

  7. 40 CFR 60.2055 - What is a waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Industrial Solid Waste Incineration Units Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What is a waste management plan?...

  8. 40 CFR 60.2620 - What is a waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What is a waste management plan?...

  9. 40 CFR 60.2055 - What is a waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Industrial Solid Waste Incineration Units Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What is a waste management plan?...

  10. 40 CFR 60.2620 - What is a waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What is a waste management plan?...

  11. 40 CFR 60.2620 - What is a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan?...

  12. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Program Management Plans. 385.25 Section 385.25 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP...

  13. Translating Strategic Planning for Information Resources into Ongoing Management.

    ERIC Educational Resources Information Center

    Penrod, James I.; Douglas, Judith V.

    1987-01-01

    With funding from the National Library of Medicine, the University of Maryland at Baltimore instituted a formal strategic planning process for an integrated academic information management system. A general model for organizational change is applied to the situation, with references to the literature on systems models and formal planning. (MLW)

  14. Management and Decision-Making in Educational Planning.

    ERIC Educational Resources Information Center

    Kravetz, Nathan, Ed.

    This IIEP seminar focused on administrative, management, supervisory, and decisionmaking techniques that are useful in the educational planning process. The techniques studied included: delphi, program evaluation and review technique (PERT), and program planning and budgeting systems (PPBS). Various experts presented papers on these techniques,…

  15. Information security management system planning for CBRN facilities

    SciTech Connect

    Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.; Glantz, Clifford S.; Landine, Guy P.; Bryant, Janet L.; Lewis, John; Mathers, Gemma; Rodger, Robert; Johnson, Christopher

    2015-12-01

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  16. Strategic planning features of subsurface management in Kemerovo Oblast

    NASA Astrophysics Data System (ADS)

    Romanyuk, V.; Grinkevich, A.; Akhmadeev, K.; Pozdeeva, G.

    2016-09-01

    The article discusses the strategic planning features of regional development based on the production and subsurface management in Kemerovo Oblast. The modern approach - SWOT analysis was applied to assess the regional development strategy. The estimation of regional development plan implementation was given for the foreseeable future.

  17. The mixed waste management facility, FY95 plan

    SciTech Connect

    Streit, R.

    1994-12-01

    This document contains the Fiscal Year 1995 Plan for the Mixed Waste Management Facility (MWMF) at Lawrence Livermore National Laboratory. Major objectives to be completed during FY 1995 for the MWMF project are listed and described. This report also contains a budget plan, project task summaries, a milestone control log, and a responsibility assignment matrix for the MWMF project.

  18. Risk management and disaster recovery planning for online libraries.

    PubMed

    Uzwyshyn, Ray

    2015-01-01

    This article presents an overview of risk management and disaster recovery planning for online libraries. It is suitable for a broad audience interested in online libraries and research centers in universities and colleges. It outlines risk mitigation strategies, and disaster recover planning for online resource-centered information systems.

  19. Risk management and disaster recovery planning for online libraries.

    PubMed

    Uzwyshyn, Ray

    2015-01-01

    This article presents an overview of risk management and disaster recovery planning for online libraries. It is suitable for a broad audience interested in online libraries and research centers in universities and colleges. It outlines risk mitigation strategies, and disaster recover planning for online resource-centered information systems. PMID:26750817

  20. QUALITY MANAGEMENT PLAN FOR THE NATIONAL CHILDREN'S STUDY

    EPA Science Inventory

    EPA has taken the lead, in consort with NIH, in developing the Quality Management Plan (QMP) for the National Children's Study (NCS); the QMP will delineate a systematic planning process for the implementation of the NCS. The QMP will state the goals and objectives of the NCS, th...

  1. NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    SciTech Connect

    GREEN,T.ET AL.

    2003-12-31

    Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetation of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.

  2. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  3. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  4. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  5. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  6. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  7. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  8. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  9. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  10. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  11. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  12. Integrating rapid risk mapping and mobile phone call record data for strategic malaria elimination planning

    PubMed Central

    2014-01-01

    Background As successful malaria control programmes re-orientate towards elimination, the identification of transmission foci, targeting of attack measures to high-risk areas and management of importation risk become high priorities. When resources are limited and transmission is varying seasonally, approaches that can rapidly prioritize areas for surveillance and control can be valuable, and the most appropriate attack measure for a particular location is likely to differ depending on whether it exports or imports malaria infections. Methods/Results Here, using the example of Namibia, a method for targeting of interventions using surveillance data, satellite imagery, and mobile phone call records to support elimination planning is described. One year of aggregated movement patterns for over a million people across Namibia are analyzed, and linked with case-based risk maps built on satellite imagery. By combining case-data and movement, the way human population movements connect transmission risk areas is demonstrated. Communities that were strongly connected by relatively higher levels of movement were then identified, and net export and import of travellers and infection risks by region were quantified. These maps can aid the design of targeted interventions to maximally reduce the number of cases exported to other regions while employing appropriate interventions to manage risk in places that import them. Conclusions The approaches presented can be rapidly updated and used to identify where active surveillance for both local and imported cases should be increased, which regions would benefit from coordinating efforts, and how spatially progressive elimination plans can be designed. With improvements in surveillance systems linked to improved diagnosis of malaria, detailed satellite imagery being readily available and mobile phone usage data continually being collected by network providers, the potential exists to make operational use of such valuable

  13. Financial Performance of Health Plans in Medicaid Managed Care

    PubMed Central

    McCue, Mike

    2012-01-01

    Objective This study assesses the financial performance of health plans that enroll Medicaid members across the key plan traits, specifically Medicaid dominant, publicly traded, and provider-sponsored. Data and Methods National Association of Insurance Commissioners (NAIC) financial data, coupled with selected state financial data, were analyzed for 170 Medicaid health plans for 2009. A mean test compared the mean values for medical loss, administrative cost, and operating margin ratios across these plan traits. Medicaid dominant plans are plans with 75 percent of their total enrollment in the Medicaid line of business. Findings Plans that are Medicaid dominant and publicly traded incurred a lower medical loss ratio and higher administrative cost ratio than multi-product and non-publicly traded plans. Medicaid dominant plans also earned a higher operating profit margin. Plans offering commercial and Medicare products are operating at a loss for their Medicaid line of business. Policy Implications Health plans that do not specialize in Medicaid are losing money. Higher medical cost rather than administrative cost is the underlying reason for this financial loss. Since Medicaid enrollees do not account for their primary book of business, these plans may not have invested in the medical management programs to reduce inappropriate emergency room use and avoid costly hospitalization. PMID:24800142

  14. Residuals Management and Water Pollution Control Planning.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Public Affairs.

    This pamphlet addresses the problems associated with residuals and water quality especially as it relates to the National Water Pollution Control Program. The types of residuals and appropriate management systems are discussed. Additionally, one section is devoted to the role of citizen participation in developing management programs. (CS)

  15. Language Planning, Channel Management, and ESP.

    ERIC Educational Resources Information Center

    Kennedy, Chris

    Channel management, a concept developed in marketing to refer to the process by which a product is moved from production to consumption, uses a channel of distribution operating at several levels, each responsible for one or more of the activities of moving the product forward to the consumer. The function of channel management is to select the…

  16. Planning and Managing the Campus Facilities Portfolio

    ERIC Educational Resources Information Center

    Daigneau, William A., Ed.

    2003-01-01

    The campus and facilities of a college should be managed using the same principles as any other investment in an institution's financial portfolio. Stemming from the APPA/National Association of College & University Business Officers (NACUBO) Institute for Facilities Finance, this book addresses the totality of managing the facilities investment…

  17. WILDLAND FIRE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    SciTech Connect

    ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION

    2003-09-01

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP that details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and implementing prescribed

  18. Open source electronic health records and chronic disease management

    PubMed Central

    Goldwater, Jason C; Kwon, Nancy J; Nathanson, Ashley; Muckle, Alison E; Brown, Alexa; Cornejo, Kerri

    2014-01-01

    Objective To study and report on the use of open source electronic health records (EHR) to assist with chronic care management within safety net medical settings, such as community health centers (CHC). Methods and Materials The study was conducted by NORC at the University of Chicago from April to September 2010. The NORC team undertook a comprehensive environmental scan, including a literature review, a dozen key informant interviews using a semistructured protocol, and a series of site visits to CHC that currently use an open source EHR. Results Two of the sites chosen by NORC were actively using an open source EHR to assist in the redesign of their care delivery system to support more effective chronic disease management. This included incorporating the chronic care model into an CHC and using the EHR to help facilitate its elements, such as care teams for patients, in addition to maintaining health records on indigent populations, such as tuberculosis status on homeless patients. Discussion The ability to modify the open-source EHR to adapt to the CHC environment and leverage the ecosystem of providers and users to assist in this process provided significant advantages in chronic care management. Improvements in diabetes management, controlled hypertension and increases in tuberculosis vaccinations were assisted through the use of these open source systems. Conclusions The flexibility and adaptability of open source EHR demonstrated its utility and viability in the provision of necessary and needed chronic disease care among populations served by CHC. PMID:23813566

  19. 43 CFR 10005.15 - Planning and management techniques applicable to the plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Planning and management techniques applicable to the plan. 10005.15 Section 10005.15 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR...

  20. 43 CFR 10005.15 - Planning and management techniques applicable to the plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Planning and management techniques applicable to the plan. 10005.15 Section 10005.15 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR...

  1. 43 CFR 10005.15 - Planning and management techniques applicable to the plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Planning and management techniques applicable to the plan. 10005.15 Section 10005.15 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR...

  2. Design of a management support system for hospital strategic planning.

    PubMed

    Applegate, L M; Mason, R O; Thorpe, D

    1986-02-01

    Recent changes in the health care industry that foster competition are drastically affecting hospital planning and marketing activities. Increased price competition, the development of less costly alternative health care delivery systems and providers, and the shift to prospective average-cost reimbursement for Medicare beneficiaries are major factors promoting a new emphasis on strategic hospital planning. Hospital information systems do not currently support the sophisticated data-collection and analysis requirements that will be needed to implement strategic planning activities. New data must be collected and old data must be analyzed and stored in new ways. New hospital information systems designs are needed to cope with the change in the economic structure of the health care industry and its effects on hospital information needs. This paper proposes a system design for a management support system that will assist hospital administrators and planners in analyzing internal organizational data and external industry data to develop strategic planning objectives, strategies, and business plans. Analysis of the structure and process of hospital strategic planning was performed to identify the information needs of hospital planners. A prototype system is currently being implemented at the University of Arizona. The system provides an integrating framework for data base management systems, executive information systems, model management systems, and dialogue management systems. Objective analytical models and subjective strategic planning models are available to assist with idea structuring and decision processing. PMID:3522794

  3. Planning, Management, and Economics of Airport Operation

    NASA Technical Reports Server (NTRS)

    Wiley, J.

    1972-01-01

    An overview of the role of the airport in the transportation complex and in the community is presented. The establishment of the airport including its requirements in regional planning and the operation of the airport as a social and economic force are discussed.

  4. Integrating Risk Management and Strategic Planning

    ERIC Educational Resources Information Center

    Achampong, Francis K.

    2010-01-01

    Strategic planning is critical to ensuring that institutions of higher education thoughtfully and systematically position themselves to accomplish their mission, vision, and strategic goals, particularly when these institutions face a myriad of risks that can negatively impact their continued financial viability and compromise their ability to…

  5. Entrepreneurship through Strategic Planning, Management, and Evaluation.

    ERIC Educational Resources Information Center

    Groff, Warren H.

    A process to assess a college's external environment and audit its internal environment in order to pursue options available to postsecondary education is described. Essentially the concept is one of matching opportunities in the external environment with institutional strengths as determined by an internal audit. Strategic planning must consider…

  6. Space Station thermal management system development status and plans

    NASA Technical Reports Server (NTRS)

    Rankin, J. G.

    1985-01-01

    The manned Space Station, as currently designed, contains a baseline thermal management system (TMS) which uses components and subsystems never before employed in manned spacecraft. The basis for the technology used in the TMS design is the result of a long-term TMS Technology Development Plan which was initiated in 1979. Rankin and Marshall (1983) have discussed the history and progress of that plan from its beginnings to early 1983. The present paper is concerned with the status of activities conducted at the NASA Lyndon B. Johnson Space Center (JSC) under this plan since 1983, taking into account also a summary of activities planned for the next several years.

  7. Appropriate radiation accident medical management: necessity of extensive preparatory planning.

    PubMed

    Dörr, H D; Meineke, V

    2006-11-01

    Despite the rareness of radiation accidents, their potential consequences can be very serious, and appropriate medical management requires sufficient preparatory planning. To identify necessary factors for sufficient preparatory planning, three different radiation accidents were analyzed, i.e. the accidents in Goiânia, Brazil, 1987; Lilo, Georgia, 1997; and Tokai-mura, Japan, 1999. These radiation accidents have been chosen specifically because they provide a wide spectrum of potential radiation accident scenarios. After a brief description of the accidents and the following medical management, the measures taken are analyzed in terms of diagnosing radiation-induced health damage, determining the cause, dealing with contamination/incorporation, pathophysiological and therapeutic principles, preparatory planning, national and international cooperation and training. Several important factors are identified that should be considered in preparatory planning, i.e. preventing delayed diagnosis and training of medical personnel. Due to limited national resources, an intensified international cooperation to manage medical radiation accidents is of great importance.

  8. 50 CFR 600.815 - Contents of Fishery Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 50 Wildlife and Fisheries 12 2014-10-01 2014-10-01 false Contents of Fishery Management Plans. 600.815 Section 600.815 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE MAGNUSON-STEVENS ACT PROVISIONS Essential Fish Habitat (EFH) § 600.815 Contents of...

  9. RISK MANAGEMENT RESEARCH PLAN FOR WET WEATHER FLOWS

    EPA Science Inventory

    This plan was prepared by the National Risk Management Research Laboratory (NRMRL) of EPA's Office of Research and Development (ORD) to guide the risk management aspects of the urban wet weather flow (WWF) research for the next five years. There are three types of urban WWF dis...

  10. 40 CFR 262.214 - Laboratory management plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... materials in compliance with this subpart. An eligible academic entity may write one Laboratory Management... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain...

  11. Planning and Management Guidelines for Inland Lake Property Owners.

    ERIC Educational Resources Information Center

    Van Dusen, Peter; Marsh, William M.

    This booklet is designed to assist prospective and established property owners in the selection, planning, and management of lake lands. It is organized into three parts: (1) selection and preparation of a building site; (2) property management; and (3) community development. These sections outline some basic guidelines for land development and…

  12. Water Management Plan for Fort Buchanan, Puerto Rico

    SciTech Connect

    Chvala, William D.; Sullivan, Gregory P.; Mcmordie, Katherine

    2004-06-01

    This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Water Management Plan (WMP). The WRMP developed during this task is an amalgam of the templates and guidelines from the Federal Energy Management Program and Army regulations.

  13. Crisis management and disaster planning: some recent lessons.

    PubMed

    1989-11-01

    Two recent disasters--Hurricane Hugo and the San Francisco-Oakland area earthquake--put a number of hospitals (and their disaster plans) to the text this fall. In future issues, we will present details on how hospitals faced those emergencies. The need for crisis management and disaster planning, however, is not limited to natural disasters like hurricanes, earthquakes, tornadoes, or floods. Man-made disasters, both internal and external, can occur virtually at any time. These include accidents, terrorists bombs, fires, explosions, and toxic chemical spills. In this report, we will present the key elements of a crisis management plan, as well as some expert pointers on what to include in a disaster plan. We will give you details on how two hospitals fared when a major air crash occurred in their community. We will tell you some of the things they would do differently, and we will also describe how an interagency disaster planning committee responded.

  14. Wildland Fire Management Plan for Brookhaven National Laboratory

    SciTech Connect

    Green,T.

    2009-10-23

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the entire BNL site

  15. Specialty pharmaceuticals: developing a management plan.

    PubMed

    Willcutts, Dave

    2002-01-01

    This is the first in a series of articles that address the complex issues associated with specialty pharmaceuticals in the development of a successful specialty pharmaceutical program, a critical component of managing this high-cost and highly fragmented sector. This article focuses on how to define specialty pharmaceuticals. Other articles in this series will explore such topics as the mechanics of developing and managing a specialty pharmaceutical program, how and when to establish clinical protocols and authorizations, the importance of data management, and the benefits from automated processes.

  16. Can we manage groundwater? A method to determine the quantitative testability of groundwater management plans

    NASA Astrophysics Data System (ADS)

    White, E. K.; Peterson, T. J.; Costelloe, J.; Western, A. W.; Carrara, E.

    2016-06-01

    Groundwater is the world's largest freshwater resource and due to overextraction, levels have declined in many regions causing extensive social and environmental impacts. Groundwater management seeks to balance and mitigate the detrimental impacts of development, with plans commonly used to outline management pathways. Thus, plan efficiency is crucial, but seldom are plans systematically and quantitatively assessed for effectiveness. This study frames groundwater management as a system control problem in order to develop a novel testability assessment rubric to determine if plans meet the requirements of a control loop, and subsequently, whether they can be quantitatively tested. Seven components of a management plan equivalent to basic components of a control loop were determined, and requirements of each component necessary to enable testability were defined. Each component was weighted based upon proposed relative importance, then segmented into rated categories depending on the degree the requirements were met. Component importance varied but, a defined objective or acceptable impact was necessary for plans to be testable. The rubric was developed within the context of the Australian groundwater management industry, and while use of the rubric is not limited to Australia, it was applied to 15 Australian groundwater management plans and approximately 47% were found to be testable. Considering the importance of effective groundwater management, and the central role of plans, our lack of ability to test many plans is concerning.

  17. Information needs for natural fire management planning

    USGS Publications Warehouse

    Parsons, David; Bancroft, Larry; Nichols, Thomas; Stohlgren, Thomas

    1985-01-01

    The development and implementation of an effective natural fire management program require a clear definition of goals and objectives, an ever-expanding information base, and effective program evaluation. Examples are given from Sequoia and Kings Canyon National Parks.

  18. Scientific inventory planning in materials management.

    PubMed

    MacKenzie, G B

    1989-06-01

    This is all just one example of how computer and appropriate analytical software routines can improve the fiscal and physical efficiency of the hospital materials management department. Together, they can provide logical, unemotional guidelines for purchase quantities, reorder points and safety stocks. Once a computer based materials management tool is in place and the materials manager has appropriate software at his or her disposal, a whole array of other possibilities can open up. For example, with appropriate analytical software and about six months of data, materials managers can estimate the performance of a current inventory system, comparing it to the expected results of upgrading current software. In effect, you can predetermine the cost-effectiveness of embedding economic order quantities, reorder points and service level policy routines before committing to such a course. Another valuable tool for materials management is "cost/use variance" software, which can pinpoint quickly and by line item whether inventory costs are rising due to higher vendor costs or to expanded use of products, and what percent each represents. A natural extension of this is an ABC analysis to identify groups of line items deserving more or less intense management. Continuous vendor performance tracking is another candidate for analytical software. The cost consequences of partial, late or missed deliveries can be severe, and delivery documentation becomes critical if the hospital has a performance liability agreement with the vendor. Other analytical software may permit dramatic improvement in storeroom labor efficiency through logical stock location schemes. In short, the basic formulas for scientific inventory management are only the beginning of a complex materials management story. PMID:10303552

  19. TWRS safety and technical integration risk management plan

    SciTech Connect

    Fordham, R.A.

    1996-03-12

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization.

  20. 20 strategies for marketing your managed care plan.

    PubMed

    Firshein, J

    1996-01-01

    In today's fiercely competitive managed care marketplace, healthcare executives must find a way to set their plans apart from the competition and build a sufficient customer base. At the same time, they must confront a growing anti-managed care backlash among a wary and confused public. Healthcare executive magazine talked with managed care experts to gather their views on key strategies to help executives meet both of these challenges. Here's what they suggest. PMID:10153671

  1. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Eligible planning, urban environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities....

  2. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Eligible planning, urban environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities....

  3. TWRS process engineering data management plan

    SciTech Connect

    Adams, M.R.

    1997-05-12

    The Tank Characterization Data Management (TCDM) system provides customers and users with data and information of known and acceptable quality when they are needed, in the form they are needed, and at a reasonable cost. The TCDM mission will be accomplished by the following: (1) maintaining and managing tank characterization data and information based on business needs and objectives including transfer of ownership to future contractors; (2) capturing data where it originates and entering it only once to control data consistency, electronic data and information management shall be emphasized to the extent practicable; (3) establishing data quality standards, and managing and certifying databases and data sources against these standards to maintain the proper level of data and information quality consistent with the importance of the data and information, data obtained at high cost with significant implications to decision making regarding tank safety and/or disposal will be maintained and managed at the highest necessary levels of quality; (4) establishing and enforcing data management standards for the Tank Characterization Database (TCD) and supporting data sources including providing mechanisms for discovering and correcting data errors before they propagate; (5) emphasizing electronic data sharing with all authorized users, customers, contractors, and stakeholders to the extent practicable; (6) safeguarding data and information from unauthorized alteration or destruction; (7) providing standards for electronic information deliverables to subcontractors and vendors to achieve uniformity in electronic data management; and (8) investing in new technology (hardware and/or software) as prudent and necessary to accomplish the mission in an efficient and effective manner.

  4. Security issues at the Department of Energy and records management

    SciTech Connect

    NUSBAUM,ANNA W.

    2000-03-13

    In order to discuss the connection between security issues within the Department of Energy and records management, the author covers a bit of security history and talks about what she calls ``the Amazing Project''. Initiated in late May 1999, it was to be a tri-laboratory (Lawrence Livermore National Laboratory of Livermore, California, Los Alamos National Laboratory of Los Alamos, New Mexico, and Sandia National Laboratories of Albuquerque, New Mexico, and Livermore, California) project. The team that formed was tasked to develop the best set of security solutions that still enabled weapon mission work to get done and the security solutions were to be the same set for everyone. The amazing project was called ''The Integrated Security Management Project'', or ''ISecM' for short. She'll describe why she thinks this project was so amazing and what it accomplished. There's a bit of sad news about the project, but then she'll move onto discuss what was learned at Sandia as a result of the project and what they're currently doing in records management.

  5. 76 FR 33341 - Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ... costs of management. Preliminary planning criteria include: 1. Lands addressed in the RMP will be public... Bureau of Land Management Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning Area in the State of Oregon and Associated Environmental Impact Statement AGENCY:...

  6. Pandemic planning as risk management: how fared the Australian federation?

    PubMed

    Carney, Terry; Bailey, Richard; Bennett, Belinda

    2012-03-01

    The role of law in managing public health challenges such as influenza pandemics poses special challenges. This article reviews Australian plans in the context of the H1N1 09 experience to assess whether risk management was facilitated or inhibited by the "number" of levels or phases of management, the degree of prescriptive detail for particular phases, the number of plans, the clarity of the relationship between them, and the role of the media. Despite differences in the content and form of the plans at the time of the H1N1 09 emerging pandemic, the article argues that in practice, the plans proved to be responsive and robust bases for managing pandemic risks. It is suggested that this was because the plans proved to be frameworks for coordination rather than prescriptive straitjackets, to be only one component of the regulatory response, and to offer the varied tool box of possible responses, as called for by the theory of responsive regulation. Consistent with the principle of subsidiarity, it is argued that the plans did not inhibit localised responses such as selective school closures or rapid responses to selected populations such as cruise ship passengers. PMID:22558906

  7. Biomedical waste management operating plan. Revision D

    SciTech Connect

    Chivington, G.K.

    1997-03-01

    Recent national incidents involving medical and/or infectious wastes indicated the need for tighter control of medical wastes. Within the last five years, improper management of medical waste resulted in the spread of disease, reuse of needles by drug addicts, and the closing of large sections of public beaches due to medical waste that washed ashore from ocean disposal. This information outlines and summarizes the general requirements of each standard or rule applicable to biohazardous waste management. In addition, it informs employees of risks associated with biohazardous waste management. Several government agencies recognized the need for regulations which prescribe safeguards to protect workers and the public against hazards associated with exposure to blood and certain body fluids potentially containing bloodborne pathogens. This information will assist employers and employees in understanding and complying with the applicable regulations.

  8. Biomedical waste management operating plan. Revision E

    SciTech Connect

    Chivington, G.K.

    1997-04-01

    Recent national incidents involving medical and/or infectious wastes indicated the need for tighter control of medical wastes. Within the last five years, improper management of medical waste resulted in the spread of disease, reuse of needles by drug addicts, and the closing of large sections of public beaches due to medical waste that washed ashore from ocean disposal. This information outlines and summarizes the general requirements of each standard or rule applicable to biohazardous waste management. In addition, it informs employees of risks associated with biohazardous waste management. Several government agencies recognized the need for regulations which prescribe safeguards to protect workers and the public against hazards associated with exposure to blood and certain body fluids potentially containing bloodborne pathogens. This information will assist employers and employees in understanding and complying with the applicable regulations.

  9. Evidence for the Will Rogers Phenomenon in Migration of Employees to Managed Care Plans

    PubMed Central

    Young, Mark J; Lenhart, Jack; Wasser, Thomas E; Czerwonka, Christopher; Davidyock, John; Sussman, Elliot J

    1999-01-01

    Employees have increasing opportunities to enroll in managed care plans, and employers tend to favor these plans because of their lower costs. However, lower costs may be the result of selection of healthier patients into managed care plans. This study measured differences in health care utilization across an indemnity plan and a managed care plan, and for all employees together. We found that apparent increases in utilization in both indemnity and managed care plans disappeared when the plans were viewed together, reflecting the migration of sicker patients from indemnity plans to managed care plans. PMID:10491247

  10. Biomedical waste management operating plan. Revision C

    SciTech Connect

    Not Available

    1996-02-14

    Recent national incidents involving medical and/or infectious wastes indicated the need for tighter control of medical wastes. Within the last five years, improper management of medical waste resulted in the spread of disease, reuse of needles by drug addicts, and the closing of large sections of public beaches due to medical waste that washed ashore from ocean disposal. Several regulations, both at the federal and state level, govern management (i.e., handling, storage, transport, treatment, and disposal) of solid or liquid waste which may present a threat of infection to humans. This waste, called infectious, biomedical, biohazardous, or biological waste, generally includes non-liquid human tissue and body parts; laboratory waste which contains human disease-causing agents; discarded sharps; human blood, blood products, and other body fluids. The information that follows outlines and summarizes the general requirements of each standard or rule applicable to biohazardous waste management. In addition, it informs employees of risks associated with biohazardous waste management.

  11. 40 CFR 60.3010 - What is a waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for... Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is...

  12. 40 CFR 60.3010 - What is a waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for... Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is...

  13. 43 CFR 1610.4-8 - Selection of resource management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Selection of resource management plan..., BUDGETING Resource Management Planning § 1610.4-8 Selection of resource management plan. After publication of the draft resource management plan and draft environmental impact statement, the Field...

  14. 43 CFR 1610.4-8 - Selection of resource management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Selection of resource management plan..., BUDGETING Resource Management Planning § 1610.4-8 Selection of resource management plan. After publication of the draft resource management plan and draft environmental impact statement, the Field...

  15. 36 CFR 221.3 - Disposal of national forest timber according to management plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... timber according to management plans. 221.3 Section 221.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE TIMBER MANAGEMENT PLANNING § 221.3 Disposal of national forest timber according to management plans. (a) Management plans for national forest timber resources shall be...

  16. 36 CFR 221.3 - Disposal of national forest timber according to management plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... timber according to management plans. 221.3 Section 221.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE TIMBER MANAGEMENT PLANNING § 221.3 Disposal of national forest timber according to management plans. (a) Management plans for national forest timber resources shall be...

  17. 40 CFR 60.2065 - What should I include in my waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... management plan? 60.2065 Section 60.2065 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... for Commercial and Industrial Solid Waste Incineration Units for Which Construction Is Commenced After... Management Plan § 60.2065 What should I include in my waste management plan? A waste management plan...

  18. 40 CFR 60.2065 - What should I include in my waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... management plan? 60.2065 Section 60.2065 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... for Commercial and Industrial Solid Waste Incineration Units for Which Construction Is Commenced After... Management Plan § 60.2065 What should I include in my waste management plan? A waste management plan...

  19. 41 CFR 102-193.10 - What are the goals of the Federal Records Management Program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are the goals of... ADMINISTRATIVE PROGRAMS 193-CREATION, MAINTENANCE, AND USE OF RECORDS § 102-193.10 What are the goals of the Federal Records Management Program? The statutory goals of the Federal Records Management Program are:...

  20. Master plan: Guntersville Reservoir Aquatic Plant Management. Executive summary

    SciTech Connect

    Not Available

    1992-12-31

    In 1989, Congress provided funding to start a five-year comprehensive project to manage aquatic plants in Guntersville Reservoir, to be jointly implemented by the US Army Corps of Engineers (Corps) and Tennessee Valley Authority (TVA). TVA serves as the overall project coordinator and is the lead agency for this project. Known as the Joint Agency Guntersville Project (JAGP), the project will test and demonstrate innovative management technologies, and incorporate the most effective technologies into a comprehensive aquatic plant management plan for Guntersville Reservoir. The JAGP is intended to serve as a National Demonstration Project for aquatic plant management. As part of this JAGP, the Master Plan for Aquatic Plant Management for the Guntersville Reservoir Project, Alabama-Tennessee is authorized by Corps Contract Number DACW62-90-C-0067.

  1. Habitat planning, maintenance and management working group

    SciTech Connect

    1997-03-01

    The Gulf of Mexico (GOM), called {open_quotes}America`s Sea,{close_quotes} is actually a small ocean basin covering over 1.5 million square kilometers. Because of the multiple uses, diversity, and size of the Gulf`s resources, management is shared by a number of governmental agencies including the Minerals Management Service, the Gulf of Mexico Fishery Management Council, the Gulf States Marine Fisheries Commission, National Marine Fisheries Service, the US Coast Guard, the US Army Corps of Engineers, and the five Gulf states fisheries agencies. All of these entities share a common goal of achieving optimum sustainable yield to maximize geological, biological, social, and economic benefits from these resources. These entities also share a common theme that the successful management of the northern GOM requires maintenance and enhancement of both the quantity and quality of habitats. A closer look at the GOM shows the sediment to be clearly dominated by vast sand and mud plains. These soft bottom habitats are preferred by many groundfish and shrimp species and, thus, have given rise to large commercial fisheries on these stocks. Hard bottom and reef habitats, on the other hand, are limited to approximately 1.6% of the total area of the Gulf, so that, while there are high demands by commercial and recreational fishermen for reef associated species, the availability of habitat for these stocks is limited. The thousands of oil and gas structures placed in the Gulf have added significant amounts of new hard substrate. The rigs-to-reefs concept was a common sense idea with support from environmental user groups and the petroleum industry for preserving a limited but valuable habitat type. As long as maximizing long-term benefits from the Gulf s resources for the greatest number of users remains the goal, then programs such as Rigs-to-Reefs will remain an important tool for fisheries and habitat managers in the Gulf.

  2. Vehicle management and mission planning systems with shuttle applications

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A preliminary definition of a concept for an automated system is presented that will support the effective management and planning of space shuttle operations. It is called the Vehicle Management and Mission Planning System (VMMPS). In addition to defining the system and its functions, some of the software requirements of the system are identified and a phased and evolutionary method is recommended for software design, development, and implementation. The concept is composed of eight software subsystems supervised by an executive system. These subsystems are mission design and analysis, flight scheduler, launch operations, vehicle operations, payload support operations, crew support, information management, and flight operations support. In addition to presenting the proposed system, a discussion of the evolutionary software development philosophy that the Mission Planning and Analysis Division (MPAD) would propose to use in developing the required supporting software is included. A preliminary software development schedule is also included.

  3. River Protection Project (RPP) Project Management Plan

    SciTech Connect

    SEEMAN, S.E.

    2000-04-01

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  4. Oak Ridge National Laboratory Waste Management Plan. Rev. 1

    SciTech Connect

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  5. Hanford Sampling Quality Management Plan (HSQMP)

    SciTech Connect

    Hyatt, J.E.

    1995-06-01

    HSQMP establishes quality requirements in response to DOE Order 5700. 6C and to 10 Code of Federal Regulations 830.120. HSQMP is designed to meet the needs of Richland Operations Office for controlling the quality of services provided by sampling operations. It is issued through the Analytical Services Program of the Waste Programs Division. This document describes the Environmental Sampling and Analysis Program activities considered to represent the best management activities necessary to achieve a sampling program with adequate control.

  6. Waste Area Grouping 4 Site Investigation Data Management Plan, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1995-03-01

    The purpose of this Data and Records Management Plan (DRMP) is to ensure that the ER environmental measurements data management process, from planning through measurement, recording, evaluation, analysis, use, reporting, and archival of data, is controlled in an efficient, comprehensive, and standardized manner. Proper organization will ensure that data and documentation are adequate to describe the procedures, events,and results of the Waste Area Grouping (WAG) 4 project. The data management process manages the life cycle of environmental measurements data from the planning of data for characterization and remediation decisions through the collection, review, and actual usage of the data for decision-making purposes to the long-term storage of the data. The nature of the decision-making process for an Environmental Restoration (ER) project is inherently repetitive. Existing data are gathered and evaluated to establish what is known about a site. Decisions regarding the nature of the contamination and potential remedial actions are formulated. Based upon the potential risk to human health and the environment, an acceptable level of uncertainty is defined for each remediation decision. WAG 4 is a shallow-waste burial site consisting of three separate areas: (1) Solid Waste Storage Area (SWSA) 4, a shallow-land burial ground containing radioactive and potentially hazardous wastes; (2) an experimental Pilot Pit Area, including a pilot-scale testing pit; and (3) sections of two abandoned underground pipelines formerly used for transporting liquid, low-level radioactive waste.

  7. Improving the medical records department processes by lean management

    PubMed Central

    Ajami, Sima; Ketabi, Saeedeh; Sadeghian, Akram; Saghaeinnejad-Isfahani, Sakine

    2015-01-01

    Background: Lean management is a process improvement technique to identify waste actions and processes to eliminate them. The benefits of Lean for healthcare organizations are that first, the quality of the outcomes in terms of mistakes and errors improves. The second is that the amount of time taken through the whole process significantly improves. Aims: The purpose of this paper is to improve the Medical Records Department (MRD) processes at Ayatolah-Kashani Hospital in Isfahan, Iran by utilizing Lean management. Materials and Methods: This research was applied and an interventional study. The data have been collected by brainstorming, observation, interview, and workflow review. The study population included MRD staff and other expert staff within the hospital who were stakeholders and users of the MRD. Statistical Analysis Used: The MRD were initially taught the concepts of Lean management and then formed into the MRD Lean team. The team then identified and reviewed the current processes subsequently; they identified wastes and values, and proposed solutions. Results: The findings showed that the MRD units (Archive, Coding, Statistics, and Admission) had 17 current processes, 28 wastes, and 11 values were identified. In addition, they offered 27 comments for eliminating the wastes. Conclusion: The MRD is the critical department for the hospital information system and, therefore, the continuous improvement of its services and processes, through scientific methods such as Lean management, are essential. Originality/Value: The study represents one of the few attempts trying to eliminate wastes in the MRD. PMID:26097862

  8. Effect of educational and electronic medical record interventions on food allergy management

    PubMed Central

    Zelig, Ari; Harwayne-Gidansky, Ilana; Gault, Allison

    2016-01-01

    Background: The growing prevalence of food allergies indicates a responsibility among primary care providers to ensure that their patients receive accurate diagnosis and management. Objective: To improve physician knowledge and management of food allergies by implementing educational and electronic medical record interventions. Methods: Pre- and posttest scores of pediatric residents and faculty were analyzed to assess the effectiveness of an educational session designed to improve knowledge of food allergy management. One year later, a best practice advisory was implemented in the electronic medical record to alert providers to consider allergy referral whenever a diagnosis code for food allergy or epinephrine autoinjector prescription was entered. A review of charts 6 months before and 6 months after each intervention was completed to determine the impact of both interventions. Outcome measurements included referrals to an allergy clinic, prescription of self-injectable epinephrine, and documentation that written emergency action plans were provided. Results: There was a significant increase in test scores immediately after the educational intervention (mean, 56.2 versus 84.3%; p < 0.001). Posttest scores remained significantly higher than preintervention scores 6 months later (mean score, 68.0 versus 56.2%; p = 0.006). Although knowledge improved, there was no significant difference in the percentage of patients who were provided allergy referral, were prescribed an epinephrine autoinjector, or were given an emergency action plan before and after both interventions. Conclusion: Neither intervention resulted in improvements in the management of children with food allergies at our pediatrics clinic. Further studies are needed to identify effective strategies to improve management of food allergies by primary care physicians.

  9. Effect of educational and electronic medical record interventions on food allergy management

    PubMed Central

    Zelig, Ari; Harwayne-Gidansky, Ilana; Gault, Allison

    2016-01-01

    Background: The growing prevalence of food allergies indicates a responsibility among primary care providers to ensure that their patients receive accurate diagnosis and management. Objective: To improve physician knowledge and management of food allergies by implementing educational and electronic medical record interventions. Methods: Pre- and posttest scores of pediatric residents and faculty were analyzed to assess the effectiveness of an educational session designed to improve knowledge of food allergy management. One year later, a best practice advisory was implemented in the electronic medical record to alert providers to consider allergy referral whenever a diagnosis code for food allergy or epinephrine autoinjector prescription was entered. A review of charts 6 months before and 6 months after each intervention was completed to determine the impact of both interventions. Outcome measurements included referrals to an allergy clinic, prescription of self-injectable epinephrine, and documentation that written emergency action plans were provided. Results: There was a significant increase in test scores immediately after the educational intervention (mean, 56.2 versus 84.3%; p < 0.001). Posttest scores remained significantly higher than preintervention scores 6 months later (mean score, 68.0 versus 56.2%; p = 0.006). Although knowledge improved, there was no significant difference in the percentage of patients who were provided allergy referral, were prescribed an epinephrine autoinjector, or were given an emergency action plan before and after both interventions. Conclusion: Neither intervention resulted in improvements in the management of children with food allergies at our pediatrics clinic. Further studies are needed to identify effective strategies to improve management of food allergies by primary care physicians. PMID:27657525

  10. Knowledge Management Platform in Advanced Product Quality Planning

    NASA Astrophysics Data System (ADS)

    Chiliban, Bogdan; Baral, Lal Mohan; Kifor, Claudiu

    2014-12-01

    Knowledge is an essential part of organizational competitiveness. This vital resource must be managed correctly within organizations in order to achieve desired performance levels within all undertakings. The process of managing knowledge is a very difficult one due to the illusive nature of the resource itself. Knowledge is stored within every aspect of an organization starting from people and ending with documents and processes. The Knowledge Management Platform is designed as a facilitator for managers and employees in all endeavours knowledge related within the Advanced Product Quality Planning Procedure

  11. ORNL long-range environmental and waste management plan

    SciTech Connect

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs.

  12. Records Needed for Orthodontic Diagnosis and Treatment Planning: A Systematic Review

    PubMed Central

    Rischen, Robine J.; Breuning, K. Hero; Bronkhorst, Ewald M.; Kuijpers-Jagtman, Anne Marie

    2013-01-01

    Background Traditionally, dental models, facial and intra-oral photographs and a set of two-dimensional radiographs are used for orthodontic diagnosis and treatment planning. As evidence is lacking, the discussion is ongoing which specific records are needed for the process of making an orthodontic treatment plan. Objective To estimate the contribution and importance of different diagnostic records for making an orthodontic diagnosis and treatment plan. Data sources An electronic search in PubMed (1948–July 2012), EMBASE Excerpta Medica (1980–July 2012), CINAHL (1982–July 2012), Web of Science (1945–July 2012), Scopus (1996–July 2012), and Cochrane Library (1993–July 2012) was performed. Additionally, a hand search of the reference lists of included studies was performed to identify potentially eligible studies. There was no language restriction. Study selection The patient, intervention, comparator, outcome (PICO) question formulated for this study was as follows: for patients who need orthodontic treatment (P), will the use of record set X (I) compared with record set Y (C) change the treatment plan (O)? Only primary publications were included. Data extraction Independent extraction of data and quality assessment was performed by two observers. Results Of the 1041 publications retrieved, 17 met the inclusion criteria. Of these, 4 studies were of high quality. Because of the limited number of high quality studies and the differences in study designs, patient characteristics, and reference standard or index test, a meta-analysis was not possible. Conclusion Cephalograms are not routinely needed for orthodontic treatment planning in Class II malocclusions, digital models can be used to replace plaster casts, and cone-beam computed tomography radiographs can be indicated for impacted canines. Based on the findings of this review, the minimum record set required for orthodontic diagnosis and treatment planning could not be defined. Systematic review

  13. What records managers should know about quality control.

    PubMed

    Bauer, C J

    1983-09-01

    This article has been written to assist the records manager who may be faced with the task of determining qualitative standards for microfilm services. While the discussion will cover a wide spectrum of microform products, it is aimed primarily at those who are considering the conversion of source documents to conventional roll film or jackets. It includes an explanation of the impact of poor quality on the use of film in a records management program, and offers suggestions for the establishment of minimum standards for both inhouse and service bureau filming. A sample contract is provided to aid in developing a more specific contract. The article is based on experience gained in the operation of a microfilm service bureau, and is a result of having observed the consequences of microfilm conversion efforts which were entered into without adequate preparation and without a definition of specific standards. Recommended standards are based upon AIIM criteria for source document microfilm and articulated in such a manner as to permit inclusion in a contract proposal or inhouse working policy. PMID:10263973

  14. Vehicle management and mission planning in support of shuttle operations.

    NASA Technical Reports Server (NTRS)

    Pruett, W. R.; Bell, J. A.

    1973-01-01

    An operational approach to shuttle mission planning during high flight frequency years (20 or more flights per year) is described wherein diverse mission planning functions interface via an interactive computer system and common data base. The Vehicle Management and Mission Planning System (VMMPS) is proposed as a means of helping to accomplish the mission planning function. The VMMPS will link together into an interactive system the major mission planning areas such as trajectory, crew, vehicle performance, and launch operations. A common data base will be an integral part of the system and the concept of standard mission types and phases will be used to minimize mission to mission uniqueness. The use of this system will eliminate much redundancy and replanning, shorten interface times between functions, and provide a means to evaluate unplanned events and modify schedules.

  15. Planning and management of science programs on Skylab

    NASA Technical Reports Server (NTRS)

    Parker, R. A. R.; Sevier, J. R.

    1974-01-01

    Discussion of the experience gained in experiment operation planning during the Skylab mission. The Skylab flight planning activity allowed the experimenters to interact with the system and provided the flexibility to respond to contingencies both major and minor. Both these aspects contributed to make efficient use of crew time thus helping to increase the science return from the mission. Examples of the need for real time scheduling response and of the tradeoffs considered between conflicting experiment requirements are presented. General management principles derived from this experience are developed. The Skylab mission experiences, together with previous Apollo mission experiences, are shown to provide a good background for Shuttle flight planning.

  16. Management implementation plan for a safety analysis and review system

    SciTech Connect

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply.

  17. Collaborative socioeconomic tool development to address management and planning needs

    USGS Publications Warehouse

    Richardson, Leslie A.; Huber, Christopher; Cullinane Thomas, Catherine; Donovan, Elizabeth; Koontz, Lynne M.

    2014-01-01

    Public lands and resources managed by the National Park Service (NPS) and other land management agencies provide a wide range of social and economic benefits to both nearby local communities and society as a whole, ranging from job creation, to access to unique recreational opportunities, to subsistence and tribal uses of the land. Over the years, there has been an increased need to identify and analyze the socioeconomic effects of the public’s use of NPS lands and resources, and the wide range of NPS land management decisions. This need stems from laws such as the National Environmental Policy Act (NEPA), increased litigation and appeals on NPS management decisions, as well as an overall need to demonstrate how parks benefit communities and the American public. To address these needs, the U.S. Geological Survey (USGS) and NPS have an ongoing partnership to collaboratively develop socioeconomic tools to support planning needs and resource management. This article discusses two such tools. The first, Assessing Socioeconomic Planning Needs (ASPN), was developed to help NPS planners and managers identify key social and economic issues that can arise as a result of land management actions. The second tool, the Visitor Spending Effects (VSE) model, provides a specific example of a type of analysis that may be recommended by ASPN. The remainder of this article discusses the development, main features, and plans for future versions and applications of both ASPN and the VSE.

  18. Principles of disaster management. Lesson 2: Program planning.

    PubMed

    Cuny, F C

    1998-01-01

    Many of the problems that develop in disaster management can be avoided with good program planning. Assessment following a disaster is essential. Needs assessment is essential in the early phases of a disaster and situation assessments become more important as the disaster process continues. Both are dynamic and continuous processes. Program planning requires setting policies, goals, and objectives with the end result of selection of strategies to accomplish the mission. Implementation of the strategies requires identification of funding sources, allocation of the resources, development management, and monitoring of the progress. Together, these elements should result in a balanced and successful program.

  19. Exxon officials rate Valdez waste management plan a success

    SciTech Connect

    Fahys, J. )

    1990-02-01

    There was a time last spring when the Exxon Valdez oil spill cleanup drifted to a halt as officials wondered how to dispose skimmers filled with oil water collected from Prince William Sound. Barges were full; off-loading gear was failing; and there was no place to dump the cargo. The disposal delay was a brief episode in what many call a successful waste management operation. Houston-based Exxon USA designed its cleanup program and achieved its goals despite such setbacks as public outcry over incineration plans. This paper reports on what Exxon officials had to say about the waste management plan.

  20. Data management plan for HANDI 2000 business management system

    SciTech Connect

    Wilson, D.

    1998-08-25

    The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of PassPort (PP) and PeopleSoft (PS) software, supports finance, supply and chemical management/Material Safety Data Sheet.

  1. Management strategies in hospitals: scenario planning.

    PubMed

    Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph

    2015-01-01

    Hintergrund: Das Krankenhausmanagement ist stets Herausforderungen ausgesetzt. Anstatt auf die Herausforderungen zu warten, sollten Ärzte und Manager im Voraus handeln, um ein optimiertes und nachhaltig wertorientiertes Gesundheitswesen zu sichern. Diese Arbeit unterstreicht die Bedeutung der Szenarienplanung in Krankenhäusern, schlägt eine ausgearbeitete Definition der Stakeholder eines Krankenhauses vor und definiert die Einflussfaktoren, denen Krankenhäuser ausgesetzt sind.Methodik: Basierend auf einer Literaturanalyse sowie auf persönlichen Interviews mit Stakeholdern eines Krankenhauses schlagen wir eine ausgearbeitete Definition von Stakeholdern vor und erarbeiteten einen Fragebogen. Dieser Fragebogen berücksichtigt folgende Einflussfaktoren, die entsprechende Auswirkungen auf das Krankenhaus-Management haben: politische/rechtliche, wirtschaftliche, soziale, technologische und Umweltkräfte.Diese Einflussfaktoren werden untersucht, um die so genannten kritischen Unsicherheiten zu entwickeln. Die gründliche Identifizierung von Unsicherheiten basierte auf „Stakeholder Feedback“.Ergebnisse: Zwei Haupt-Unsicherheiten wurden identifiziert und in dieser Studie berücksichtigt:die Entwicklung der Arbeitsbelastung für das medizinische Personaldie gewinnorientierte Leistung des medizinischen Personals.Entsprechend der entwickelten Szenarien konnten wir folgende Kernstrategie empfehlen: komplementäre Ausbildung sowohl des medizinischen Personals als auch der nicht-medizinischen Top-Führungskräfte und Manager von Krankenhäusern. Ergänzende szenariospezifische strategische Optionen sollen, falls erforderlich, in Betracht gezogen werden, um eine bestimmte zukünftige Entwicklung des medizinischen Umfeldes zu optimieren.Schlussfolgerung: Strategische Planung in Krankenhäusern ist wichtig, um nachhaltigen Erfolg zu gewährleisten. Diese Planung soll mehrere Situationen berücksichtigen und integriert interne und externe Ein- und Ausblicke. Darüber hinaus

  2. Quality assurance management plan special analytical support

    SciTech Connect

    Myers, M.L.

    1997-01-30

    It is the policy of Special Analytical Support (SAS) that the analytical aspects of all environmental data generated and processed in the laboratory, subject to the Environmental Protection Agency (EPA), U.S. Department of Energy (DOE), WDOE or other project specific requirements, be of known and acceptable quality. It is the intention of this QAPP to establish and assure that an effective quality controlled management system is maintained in order to meet the quality requirements of the intended use(s) of the data.

  3. CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    SciTech Connect

    DAVIS, M.

    2005-04-01

    The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

  4. 76 FR 27344 - Water Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-11

    ... will evaluate different approaches for water resources management to determine the potential impacts on... National Park Service Water Resources Management Plan/Environmental Impact Statement, Mojave National... Prepare a Water Resources Management Plan/ Environmental Impact Statement for Mojave National...

  5. 76 FR 38685 - Draft General Management Plan Amendment/Environmental Impact Statement, Tumacacori National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-01

    ... associated mission resources. A general management plan (GMP) will establish the overall management direction... conditions, and the park would continue to be managed based on the GMP completed in 1996. This 1996 plan...

  6. 25 CFR 900.53 - What kind of records shall the property management system maintain?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Property Management System Standards § 900.53 What kind of records shall the property management system maintain? The... 25 Indians 2 2011-04-01 2011-04-01 false What kind of records shall the property management...

  7. 25 CFR 900.53 - What kind of records shall the property management system maintain?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Property Management System Standards § 900.53 What kind of records shall the property management system maintain? The... 25 Indians 2 2012-04-01 2012-04-01 false What kind of records shall the property management...

  8. Therapeutic risk management of the suicidal patient: safety planning.

    PubMed

    Matarazzo, Bridget B; Homaifar, Beeta Y; Wortzel, Hal S

    2014-05-01

    This column is the fourth in a series describing a model for therapeutic risk management of the suicidal patient. Previous columns presented an overview of the therapeutic risk management model, provided recommendations for how to augment risk assessment using structured assessments, and discussed the importance of risk stratification in terms of both severity and temporality. This final column in the series discusses the safety planning intervention as a critical component of therapeutic risk management of suicide risk. We first present concerns related to the relatively common practice of using no-suicide contracts to manage risk. We then present the safety planning intervention as an alternative approach and provide recommendations for how to use this innovative strategy to therapeutically mitigate risk in the suicidal patient.

  9. Developing an IAQ management plan for commercial buildings

    SciTech Connect

    Gaynor, R.P. . Powers Educational Services)

    1993-08-01

    The cost of one sick day due to an indoor air quality (IAQ) problem can equal the cost of energy for that one person's space for up to six months. The technology is available to begin effective management of this issue now, before the complaints and illnesses reach levels that result in all building operations being controlled by government regulation. Indoor air quality has become a major issue and concern in commercial building management. There are many reasons for this trend, but it is principally because health concerns, along with labor and legal costs as a result of poor air quality, have all risen so sharply in recent years. At the top of the list of solutions to this problem is the development of a proactive IAQ management plan. This article includes some useful advice on establishing practices and procedures that lead to the development of a successful plan for management.

  10. Investigation-Derived Waste Management Plan. Revision 2

    SciTech Connect

    Molen, G.

    1995-05-24

    SRS has implemented a comprehensive environmental program to maintain compliance with environmental regulations and mitigate impacts to the environment. One element of the environmental program is the investigation of inactive waste units. Environmental Investigation-Derived Waste (IDW). IDW may include purge water , soil cuttings, drilling fluids, well pumping test and development water, decontamination solutions, contaminated equipment, and personal protection equipment (PPE). In cases where investigations confirm the presence of contamination and the IDW contains waste constituents in concentrations high enough to be of environmental or health concern, special management procedures are warranted. This IDW Management Plan describes specific SRS initiatives for IDW management. The goal is the development of a plan for prudent management of IDW from environmental investigations that is protective of human health and the environment.

  11. Managerial fuzzy optimal planning for solid-waste management systems

    SciTech Connect

    Chang, N.B.; Wang, S.F.

    1996-07-01

    The emphasis on waste reduction and recycling requirements prior to incineration and the promulgation of Good Combustion Practice (GCP) for emission control of trace organic compounds during incineration have created conflicting solid-waste management goals. The most critical questions in system planning include: to what extent are recycling and incineration compatible? And what are the subsequent economic impacts on the private and public sectors under specific management scenarios? However, the inherent complexity of composition, generation, and heat value of the waste streams as well as the stability of the secondary material market may result in additional difficulties in management decision making. This paper presents a nonlinear fuzzy goal programming approach for solving such questions. In particular, it demonstrates how fuzzy, or imprecise, objectives of the decision makers can be quantified through the use of specific membership functions in various types of management-planning scenarios.

  12. System integration test plan for HANDI 2000 business management system

    SciTech Connect

    Wilson, D.

    1998-08-24

    This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.

  13. Planning for a smooth transition: evaluation of a succession planning program for prospective nurse unit managers.

    PubMed

    Manning, Vicki; Jones, Alan; Jones, Pamela; Fernandez, Ritin S

    2015-01-01

    The current and projected nurse workforce shortage has created significant pressure on health care organizations to examine their approach to managing talent. This includes the need for strategic development of new formal leaders. This article reports on a succession planning program for prospective nursing unit managers. Eight prospective management candidates participated in a Future Nursing Unit Managers program. The effectiveness of the program was measured through a comparison of pre- and postprogram surveys relating to participants' perception of personal managerial and leadership skills. Significant differences in scores from baseline to 6-month follow-up surveys were observed in the participants' confidence in undertaking the nursing unit manager role and in their management skills. Investment in structured programs to prepare nurses for leadership roles is strongly recommended as a management workforce strategy. PMID:25474668

  14. Planning for a smooth transition: evaluation of a succession planning program for prospective nurse unit managers.

    PubMed

    Manning, Vicki; Jones, Alan; Jones, Pamela; Fernandez, Ritin S

    2015-01-01

    The current and projected nurse workforce shortage has created significant pressure on health care organizations to examine their approach to managing talent. This includes the need for strategic development of new formal leaders. This article reports on a succession planning program for prospective nursing unit managers. Eight prospective management candidates participated in a Future Nursing Unit Managers program. The effectiveness of the program was measured through a comparison of pre- and postprogram surveys relating to participants' perception of personal managerial and leadership skills. Significant differences in scores from baseline to 6-month follow-up surveys were observed in the participants' confidence in undertaking the nursing unit manager role and in their management skills. Investment in structured programs to prepare nurses for leadership roles is strongly recommended as a management workforce strategy.

  15. Waste Isolation Pilot Plant land management plan

    SciTech Connect

    1996-05-01

    On October 30, 1992, the WIPP Land Withdrawal Act became law. This Act transferred the responsibility for the management of the WIPP Land Withdrawal Area (WILWA) from the Secretary of the Interior to the Secretary of Energy. In accordance with sections 3(a)(1) and (3) of the Act, these lands {open_quotes}{hor_ellipsis}are withdrawn from all forms of entry, appropriation, and disposal under the public land laws{hor_ellipsis}{close_quotes}and are reserved for the use of the Secretary of Energy {open_quotes}{hor_ellipsis}for the construction, experimentation, operation, repair and maintenance, disposal, shutdown, monitoring, decommissioning, and other activities, associated with the purposes of WIPP as set forth in the Department of Energy National Security and Military Applications of Nuclear Energy Act of 1980 and this Act.{close_quotes}. As a complement to this LMP, a MOU has been executed between the DOE and the BLM, as required by section 4(d) of the Act. The state of New Mexico was consulted in the development of the MOU and the associated Statement of Work (SOW).

  16. Rainwater Wildlife Area Management Plan : Executive Summary.

    SciTech Connect

    Childs, Allen B.; Confederated Tribes of the Umatilla Indian Reservation in Oregon.

    2002-02-01

    The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Northwest Power Act directs the NPPC to develop a program to ''protect, mitigate, and enhance'' fish and wildlife of the Columbia River and its tributaries. The overarching goals include: A Columbia River ecosystem that sustains an abundant, productive, and diverse community of fish and wildlife; Mitigation across the basin for the adverse effects to fish and wildlife caused by the development and operation of the hydrosystem; Sufficient populations of fish and wildlife for abundant opportunities for tribal trust and treaty right harvest and for non-tribal harvest; and Recovery of the fish and wildlife affected by the development and operation of the hydrosystem that are listed under the Endangered Species Act.

  17. Examining the Planning and Management of Principal Succession

    ERIC Educational Resources Information Center

    Zepeda, Sally J.; Bengtson, Ed; Parylo, Oksana

    2012-01-01

    Purpose: The purpose of this study is to examine principal succession planning and management by analyzing current practices of handling school leader succession in four Georgia school systems. Design/methodology/approach: Looking through the lens of organizational leadership succession theory, the practices of school systems as they experienced…

  18. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... purposes of this rule and the Clean Water Act assistance programs under 40 CFR part 35, subparts A and H if... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS...

  19. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... purposes of this rule and the Clean Water Act assistance programs under 40 CFR part 35, subparts A and H if... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS...

  20. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... purposes of this rule and the Clean Water Act assistance programs under 40 CFR part 35, subparts A and H if... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS...

  1. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... purposes of this rule and the Clean Water Act assistance programs under 40 CFR part 35, subparts A and H if... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS...

  2. 25 CFR 700.721 - Range management plans.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) Scheduling for operation and maintenance of existing range improvements. ... 25 Indians 2 2011-04-01 2011-04-01 false Range management plans. 700.721 Section 700.721 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES...

  3. Environmental restoration and remediation technical data management plan

    SciTech Connect

    Key, K.T.; Fox, R.D.

    1994-02-01

    The tasks performed in the Remedial Investigation/Feasibility Study (RI/FS) work plan for each Hanford Site operable unit must meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al 1992). An extensive amount of data will be generated in the evaluation and remediation of hazardous waste sites at the Site. The data must be of sufficient quality, as they will be used to evaluate the need, select the method(s), and support the full remediation of the waste sites as stipulated in the Tri-Party Agreement. In particular, a data management plan (DMP) is to be included in an RI/FS work plan for managing the technical data obtained during the characterization of an operable unit, as well as other data related to the study of the operable unit. Resource Conservation and Recovery Act of 1976 (RCRA) sites are involved in the operable unit. Thus, the data management activities for the operable unit should be applied consistently to RCRA sites in the operable unit as well. This DMP provides common direction for managing-the environmental technical data of all defined operable units at the Hanford Site during the RI/FS activities. Details specific to an operable unit will be included in the actual work plan of that operable unit.

  4. A Model for Talent Management and Career Planning

    ERIC Educational Resources Information Center

    Waheed, Sajjad; Zaim, A. Halim

    2015-01-01

    This paper discusses a talent management and career planning system designed based on the performance and qualifications of a group of interns working for an emerging social media company located in Istanbul. The proposed model is dynamic, comparative, and perceptional in constructing a talent pool for an organization. This system was developed…

  5. Recommendations for Emergency Management Planning for School Facilities.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin.

    Numerous events, such as hurricanes, floods, and tornadoes, constitute a natural disaster for public schools. Human-caused disasters include hazardous-material emergencies, civil riots, fires, and nuclear accidents. This document contains emergency-management planning guidelines, developed by the Texas Education Agency, to help local school…

  6. Policy, Planning and Management of Education in Small States.

    ERIC Educational Resources Information Center

    Lillis, Kevin M., Ed.

    This book offers a range of original perspectives on issues of planning and managing education in small systems. It is based on the proceedings of a conference held at the University of London's Institute for Education, supported by the European Community Directorate General for Development. The conference addressed a range of themes relevant to…

  7. 40 CFR 60.55c - Waste management plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and recycling of paper, cardboard, plastics, glass, batteries, food waste, and metals (e.g., aluminum... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Waste management plan. 60.55c Section... Waste Incinerators for Which Construction is Commenced After June 20, 1996 § 60.55c Waste...

  8. 40 CFR 60.55c - Waste management plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and recycling of paper, cardboard, plastics, glass, batteries, food waste, and metals (e.g., aluminum... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Waste management plan. 60.55c Section... Waste Incinerators for Which Construction is Commenced After June 20, 1996 § 60.55c Waste...

  9. 40 CFR 60.55c - Waste management plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and recycling of paper, cardboard, plastics, glass, batteries, food waste, and metals (e.g., aluminum... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Waste management plan. 60.55c Section... Waste Incinerators for Which Construction is Commenced After June 20, 1996 § 60.55c Waste...

  10. The Dean as Manager: Strategic Planning for the Library School.

    ERIC Educational Resources Information Center

    Carrigan, Dennis

    1988-01-01

    Examination of the importance of management in library schools discusses two problem areas in the library school environment--the parent university and society beyond the university. The need for strategic planning which includes an assessment of the environment is emphasized. (Six references) (MES)

  11. Management Planning and Control: Supporting Knowledge-Intensive Organizations

    ERIC Educational Resources Information Center

    Herremans, Irene M.; Isaac, Robert G.

    2005-01-01

    Purpose: The purpose of this paper is to develop propositions for empirical validation regarding appropriate management planning and control systems (MPACS) in knowledge-intensive organizations. Design/methodology/approach: The propositions were developed from interviews with members of a knowledge-intensive virtual organization that is known for…

  12. National Ignition Facility Risk Management Plan, Revision 2

    SciTech Connect

    Brereton, S J

    2002-06-01

    The National Ignition Facility (NIF) Risk Management Plan (LLNL, 1997a) was originally prepared in 1997 in accordance with the Department of Energy (DOE) Life Cycle Asset Management Good Practice Guide (DOE, 1996a) and supported NIF Critical Decision 3, approval to initiate construction (DOE, 1997a). The plan was updated in 1998 to reflect realized risks such as the finding and successful clean up of polychlorinated biphenyl (PCB)-filled electrical capacitors at the NIF excavation during initial construction and the litigation of the Programmatic Environmental Impact Statement for Stockpile Stewardship (DOE, 1996b) by a group of non-governmental organizations led by the Natural Resources Defense Council. The current update of the Risk Management Plan brings it into compliance with the applicable DOE Orders and Standards and addresses new risks, such as assuring safety during the period when construction, special equipment installation, and commissioning are occurring simultaneously at the NIF site, and the extensive use of models to manage technical performance risk. The objectives of the updated plan are to: (1) Identify the risks to the completion of the Project in terms of meeting performance and regulatory requirements, ES&H, cost, and schedule; (2) Assess or the risks in terms of likelihood of occurrence and their impact potential relative to technical performance, ES&H, costs, and schedule; and (3) Address suitable risk mitigation measures for each identified risk.

  13. 25 CFR 161.203 - Are range management plans required?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ....203 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER NAVAJO PARTITIONED... studies; (8) Control of livestock diseases and parasites; (9) Fencing or other structures necessary to implement any of the other provisions in the range management plan; (10) Special land uses; and (11)...

  14. 25 CFR 161.203 - Are range management plans required?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ....203 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER NAVAJO PARTITIONED... studies; (8) Control of livestock diseases and parasites; (9) Fencing or other structures necessary to implement any of the other provisions in the range management plan; (10) Special land uses; and (11)...

  15. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... purposes of this rule and the Clean Water Act assistance programs under 40 CFR part 35, subparts A and H if... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS...

  16. Environmental Development cum Forest Plantation Planning and Management.

    ERIC Educational Resources Information Center

    Katoch, C. D.

    This textbook covers environmental conservation through forest plantation planning and management for all levels of forestry professionals and non-professionals in India and abroad. The book is divided into six parts and 29 sections in sequential order. Part I contains details on site selection, site preparations, site clearance, layout, and…

  17. Instructional Management Plans for the Cooperative Industrial Education Core Curriculum.

    ERIC Educational Resources Information Center

    Missouri Univ., Columbia. Instructional Materials Lab.

    These Instructional Management Plans (IMPs) are designed to assist teacher-coordinators of cooperative industrial education (CIE) in the design of application experiences for each task of each core competency area. They are intended to help the CIE teacher-coordinator direct the learning of occupational competencies by helping the student-learners…

  18. National Risk Management Research Laboratory Strategic plan and Implementation - Overview

    EPA Science Inventory

    This publication provides an overview of the strategic plan recently developed by the National Risk Management Research Laboratory (NRMRL). It includes a description of NRMRL's mission and goals and their alignment with Agency goals. Additionally, the overview contains a brief se...

  19. Asset Management Plans, Appraisal Guidance for 2003-04.

    ERIC Educational Resources Information Center

    Department for Education and Skills, London (England).

    This document is one in a series which aims to assist Local Authorities in Britain with asset management planning (AMPs) for schools. AMPs set out the information needed, and the criteria used, to make decisions about spending on school premises. The document provides guidance on the appraisal of school AMPs in 2002 to inform 3-year formulaic…

  20. An Operational Framework for Insecticide Resistance Management Planning.

    PubMed

    Chanda, Emmanuel; Thomsen, Edward K; Musapa, Mulenga; Kamuliwo, Mulakwa; Brogdon, William G; Norris, Douglas E; Masaninga, Freddie; Wirtz, Robert; Sikaala, Chadwick H; Muleba, Mbanga; Craig, Allen; Govere, John M; Ranson, Hilary; Hemingway, Janet; Seyoum, Aklilu; Macdonald, Michael B; Coleman, Michael

    2016-05-01

    Arthropod vectors transmit organisms that cause many emerging and reemerging diseases, and their control is reliant mainly on the use of chemical insecticides. Only a few classes of insecticides are available for public health use, and the increased spread of insecticide resistance is a major threat to sustainable disease control. The primary strategy for mitigating the detrimental effects of insecticide resistance is the development of an insecticide resistance management plan. However, few examples exist to show how to implement such plans programmatically. We describe the formulation and implementation of a resistance management plan for mosquito vectors of human disease in Zambia. We also discuss challenges, steps taken to address the challenges, and directions for the future. PMID:27089119

  1. Savannah River Site Geographic Information System management plan

    SciTech Connect

    Gordon, D.E.

    1992-02-01

    A plan for managing the development of Geographic Information System (GIS) applications at the Savannah River Site (SRS) in a coordinated, integrated fashion has been developed. Included in the plan are discussions on the guidance for GIS activities at the site, the overall strategy for managing GIS applications development, the specific administrative and programmatic tasks with projected completion schedules, and the organizational structure in place to direct this GIS effort. The Department of Energy-Savannah River Field Office (DOE-SR) has encouraged all primary subcontracting organizations at SRS involved with the mapping of spatial data to coordinate their efforts and be more cost effective. This plan provides a description of organized activities in 1992 for establishing a coordinated approach for developing and implementing GIS technology.

  2. Sandia National Laboratories, California sewer system management plan.

    SciTech Connect

    Holland, Robert C.

    2010-02-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Site Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan. Elements of this Plan are under development in accordance with the SWRCB's schedule.

  3. An Operational Framework for Insecticide Resistance Management Planning

    PubMed Central

    Chanda, Emmanuel; Thomsen, Edward K.; Musapa, Mulenga; Kamuliwo, Mulakwa; Brogdon, William G.; Norris, Douglas E.; Masaninga, Freddie; Wirtz, Robert; Sikaala, Chadwick H.; Muleba, Mbanga; Craig, Allen; Govere, John M.; Ranson, Hilary; Hemingway, Janet; Seyoum, Aklilu; Macdonald, Michael B.

    2016-01-01

    Arthropod vectors transmit organisms that cause many emerging and reemerging diseases, and their control is reliant mainly on the use of chemical insecticides. Only a few classes of insecticides are available for public health use, and the increased spread of insecticide resistance is a major threat to sustainable disease control. The primary strategy for mitigating the detrimental effects of insecticide resistance is the development of an insecticide resistance management plan. However, few examples exist to show how to implement such plans programmatically. We describe the formulation and implementation of a resistance management plan for mosquito vectors of human disease in Zambia. We also discuss challenges, steps taken to address the challenges, and directions for the future. PMID:27089119

  4. An Operational Framework for Insecticide Resistance Management Planning.

    PubMed

    Chanda, Emmanuel; Thomsen, Edward K; Musapa, Mulenga; Kamuliwo, Mulakwa; Brogdon, William G; Norris, Douglas E; Masaninga, Freddie; Wirtz, Robert; Sikaala, Chadwick H; Muleba, Mbanga; Craig, Allen; Govere, John M; Ranson, Hilary; Hemingway, Janet; Seyoum, Aklilu; Macdonald, Michael B; Coleman, Michael

    2016-05-01

    Arthropod vectors transmit organisms that cause many emerging and reemerging diseases, and their control is reliant mainly on the use of chemical insecticides. Only a few classes of insecticides are available for public health use, and the increased spread of insecticide resistance is a major threat to sustainable disease control. The primary strategy for mitigating the detrimental effects of insecticide resistance is the development of an insecticide resistance management plan. However, few examples exist to show how to implement such plans programmatically. We describe the formulation and implementation of a resistance management plan for mosquito vectors of human disease in Zambia. We also discuss challenges, steps taken to address the challenges, and directions for the future.

  5. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a... cost of such activities under §§ 1003.201 through 1003.204. (b)...

  6. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 570.205 Section 570.205..., urban environmental design and policy-planning-management-capacity building activities. (a) Planning... known or suspected environmental contamination. (5) (6) Policy—planning—management—capacity...

  7. 77 FR 13141 - Notice of Intent To Prepare a Master Leasing Plan, Amendments to the Resource Management Plans...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-05

    ... Bureau of Land Management Notice of Intent To Prepare a Master Leasing Plan, Amendments to the Resource..., intend to prepare a Master Leasing Plan (MLP), amendments to the 2008 Moab and Monticello Resource Management Plans (RMPs), and a single environmental impact statement (EIS) to consider leasing for oil...

  8. 77 FR 39253 - Final Environmental Impact Statement on the Denali Park Road Vehicle Management Plan, Denali...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ... NATIONAL PARK SERVICE Final Environmental Impact Statement on the Denali Park Road Vehicle Management Plan... of the Final Environmental Impact Statement for the Denali Park Road Vehicle Management Plan. SUMMARY... Denali Park Road Vehicle Management Plan (Plan/FEIS), for Denali National Park and Preserve, Alaska....

  9. 40 CFR 62.14580 - What is a waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A... 40 Protection of Environment 8 2011-07-01 2011-07-01 false What is a waste management plan?...

  10. 40 CFR 62.14580 - What is a waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A... 40 Protection of Environment 8 2010-07-01 2010-07-01 false What is a waste management plan?...

  11. 40 CFR 62.14580 - What is a waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A... 40 Protection of Environment 9 2013-07-01 2013-07-01 false What is a waste management plan?...

  12. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 13 2013-01-01 2013-01-01 false Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of...

  13. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 13 2014-01-01 2013-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of...

  14. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 13 2012-01-01 2012-01-01 false Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of...

  15. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 13 2011-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of...

  16. 40 CFR 62.14432 - When must my waste management plan be completed?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false When must my waste management plan be... POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious Waste Incinerators Constructed on or Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed?...

  17. 40 CFR 62.14432 - When must my waste management plan be completed?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false When must my waste management plan be... POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious Waste Incinerators Constructed on or Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed?...

  18. 40 CFR 62.14430 - Must I prepare a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false Must I prepare a waste management plan... Federal Plan Requirements for Hospital/Medical/Infectious Waste Incinerators Constructed on or Before June 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All...

  19. 40 CFR 62.14432 - When must my waste management plan be completed?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious Waste Incinerators Constructed on or Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed? As... 40 Protection of Environment 8 2011-07-01 2011-07-01 false When must my waste management plan...

  20. 40 CFR 62.14432 - When must my waste management plan be completed?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false When must my waste management plan be... POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious Waste Incinerators Constructed On Or Before December 1, 2008 Waste Management Plan § 62.14432 When must my waste management plan be...