Science.gov

Sample records for recovery act arra

  1. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance

    SciTech Connect

    Robert P. Breckenridge; Thomas R. Wood

    2010-08-01

    The purpose of this document is to evaluate the opportunity for Letterkenny Army Depot (LEAD or the Depot) to utilize biogenic methane, which may be available in shale formations under the Depot, to provide a supplemental source of natural gas that could allow the Depot to increase energy independence. Both the Director and Deputy of Public Works at the Depot are supportive in general of a methane production project, but wanted to better understand the challenges prior to embarking on such a project. This report will cover many of these issues. A similar project has been successfully developed by the U. S. Army at Ft. Knox, KY, which will be explained and referred to throughout this report as a backdrop to discussing the challenges and opportunities at LEAD, because the geologic formations and possibilities at both sites are similar. Prior to discussing the opportunity at LEAD, it is important to briefly discuss the successful methane recovery operation at Ft. Knox, because it is applicable to the projected approach for the LEAD methane system. The Ft. Knox project is an excellent example of how the U. S. Army can use an onsite renewable resource to provide a secure energy source that is not dependent on regional energy networks and foreign oil. At Ft. Knox, the U. S. Army contracted (through a utility co-op) with an energy production company to drill wells, establish a distribution infrastructure, and provide the equipment needed to prepare and compress the produced methane gas for use by base operations. The energy production company agreed to conduct the exploratory investigation at Ft. Knox with no cost to the government, as long as they could be granted a long-term contract if a reliable energy resource was established. The Depot is located, in part, over an Ordovician Age shale formation that may have the potential for producing biogenic methane, similar to the Devonian Age shale found beneath Ft. Knox. However, the Ordovician Age Shale beneath the

  2. Results from USGS Geodesy Projects Funded by the American Recovery and Reinvestment Act (ARRA) of 2009

    NASA Astrophysics Data System (ADS)

    King, N. E.; Hudnut, K.; Leith, W. S.; Lisowski, M.; Murray-Moraleda, J. R.; Prentice, C. S.; Roeloffs, E. A.

    2011-12-01

    The American Recovery and Reinvestment Act of 2009 (ARRA) provided money to the U.S. Geological Survey (USGS) for many projects, including improvements to earthquake and volcano monitoring. The USGS Earthquake Hazards Program's geodetic projects included station upgrades, a few new stations in special cases where new recurring costs would be minimal, new equipment and software tools, and improvements to geodetic infrastructure. USGS awarded $2.7 million for six cooperative agreements to the University of California, Berkeley (UCB); Central Washington University (CWU), University of California, San Diego (UCSD), and UNAVCO, Inc., with UCSD and UNAVCO each receiving two different grants. The cooperative agreements provided funding and government-furnished GNSS receivers and antennas to upgrade telemetry and replace obsolete equipment at GPS stations in California and the Pacific Northwest. The USGS Earthquake and Volcano Hazards Programs is upgrading USGS-operated GPS networks with ARRA-funded GNSS equipment. ARRA emphasized upgrades at existing stations. However, in cases where new stations eliminated existing costs or partners assumed costs, a few stations were built to install a demonstration fault slip sensor along the southern San Andreas fault and to enhance the USGS mission in the San Francisco Bay Area. GNSS equipment was added to existing seismic stations in northern California. The cooperative agreements also provided funding for replacement of borehole strainmeters in central California, and long-delayed infrastructure maintenance at UCSD's Piñon Flat and Durmid Hill observatories. Finally, the Earthquake Hazards Program used ARRA funding to acquire high-resolution LiDAR data in the eastern San Francisco Bay Area, the central California Coast Ranges, and the New Madrid Seismic Zone, and, in cooperation with the Volcano Hazards Program, to develop software for data visualization, editing and statistics.

  3. Comprehensive Energy Assessment: EE and RE Project Optimization Modeling for United States Pacific Command (USPACOM) American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance

    SciTech Connect

    Brigantic, Robert T.; Papatyi, Anthony F.; Perkins, Casey J.

    2010-09-30

    This report summarizes a study and corresponding model development conducted in support of the United States Pacific Command (USPACOM) as part of the Federal Energy Management Program (FEMP) American Reinvestment and Recovery Act (ARRA). This research was aimed at developing a mathematical programming framework and accompanying optimization methodology in order to simultaneously evaluate energy efficiency (EE) and renewable energy (RE) opportunities. Once developed, this research then demonstrated this methodology at a USPACOM installation - Camp H.M. Smith, Hawaii. We believe this is the first time such an integrated, joint EE and RE optimization methodology has been constructed and demonstrated.

  4. American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 282 Renewable Energy Opportunities at Fort Gordon, Georgia

    SciTech Connect

    Boyd, Brian K.; Gorrissen, Willy J.; Hand, James R.; Horner, Jacob A.; Orrell, Alice C.; Russo, Bryan J.; Weimar, Mark R.; Williamson, Jennifer L.; Nesse, Ronald J.

    2010-09-30

    This document provides an overview of renewable resource potential at Fort Gordon, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the American Recovery and Reinvestment Act (ARRA) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Gordon took place on March 9, 2010.

  5. State Implementation and Perceptions of Title I School Improvement Grants under the Recovery Act: One Year Later. Online Appendix--State Responses to Open-Ended Questions about the ARRA SIG Program

    ERIC Educational Resources Information Center

    Center on Education Policy, 2012

    2012-01-01

    To learn more about states' experiences with implementing school improvement grants (SIGs) funded through the American Recovery and Reinvestment Act (ARRA), the Center on Education Policy (CEP) administered a survey to state Title I directors. (Title I of the Elementary and Secondary Education Act provides federal funds to schools in low-income…

  6. THE POSITIVE IMPACTS OF AMERICAN REINVESTMENT AND RECOVERY ACT (ARRA) FUNDING TO THE WASTE MANAGEMENT PROGRAM ON HANFORD'S PLATEAU REMEDIATION PROJECT

    SciTech Connect

    BLACKFORD LT

    2010-01-19

    In April 2009, the Department of Energy (DOE) Richland Operations Office (RL) was allocated $1.6 billion (B) in ARRA funding to be applied to cleanup projects at the Hanford Site. DOE-RL selected projects to receive ARRA funding based on 3-criteria: creating/saving jobs, reducing the footprint of the Hanford Site, and reducing life-cycle costs for cleanup. They further selected projects that were currently covered under regulatory documents and existing prime contracts, which allowed work to proceed quickly. CH2M HILL Plateau Remediation Company (CHPRC) is a prime contractor to the DOE focused on the environmental cleanup of the DOE Hanford Site Central Plateau. CHPRC was slated to receive $1.36B in ARRA funding. As of January, 2010, CHPRC has awarded over $200 million (M) in subcontracts (64% to small businesses), created more that 1,100 jobs, and touched more than 2,300 lives - all in support of long-term objectives for remediation of the Central Plateau, on or ahead of schedule. ARRA funding is being used to accelerate and augment cleanup activities already underway under the baseline Plateau Remediation Contract (PRC). This paper details challenges and accomplishments using ARRA funding to meet DOE-RL objectives of creating/saving jobs, expediting cleanup, and reducing lifecycle costs for cleanup during the first months of implementation.

  7. Solicitation and Selection of Partner Projects, Technical Team Leads, and Measurement and Validation Contractors for the American Recovery and Reinvestment Act (ARRA) Funded Commercial Building Partnerships (CBP-2)

    SciTech Connect

    Nesse, Ronald J.; Baechler, Michael C.; Iverson, Megan M.

    2010-09-30

    In March 2010, Pacific Northwest National Laboratory (PNNL) joined two other labs receiving ARRA funding, Lawrence Berkeley National Laboratory (LBNL) and the National Renewable National Laboratory (NREL), to began weekly conference calls with the goal of coordinating a joint lab solicitation to support the ARRA-funded CBP project. Two solicitations were identified for: 1) new CBP Partners; 2) technical contractors to provide technical assistance and measurement and verification (M&V) contractors. The M&V contractors support the work by providing model reviews and conducting monitoring studies to verify building performance. This report documents the process used by the labs for the solicitations, and describes the process and outcomes for PNNL, selection of candidate Partners, technical teams, and M&V contractors.

  8. American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 281 Solar Hot Water Application Assessment for U.S. Army IMCOM-Southeast Region

    SciTech Connect

    Russo, Bryan J.; Chvala, William D.

    2010-09-30

    The Energy Independence and Security Act of 2007 requires installations (EISA) to install solar systems of sufficient capacity to provide 30% of service hot water in new construction and renovations where cost-effective. However, installations are struggling with how to implement solar hot water, and while several installations are installing solar hot water on a limited basis, paybacks remain long. Pacific Northwest National Laboratory (PNNL) was tasked to address this issue to help determine how best to implement solar hot water projects. This documents discusses the results of that project.

  9. Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA): Quarter 4 2013 Composite Data Products

    SciTech Connect

    Kurtz, J.; Sprik, S.

    2014-06-01

    This report includes the composite data products (CDPs) for early fuel cell market deployments in quarter 4 of 2013. Results are presented for ARRA (projects funded by the American Recovery and Reinvestment Act of 2009 [ARRA]) and Combined (projects funded by DOE Interagency Agreements [IAA], Department of Defense Defense Logistics Agency [DLA], and ARRA).

  10. Recovery Act Milestones

    ScienceCinema

    Rogers, Matt

    2016-07-12

    Every 100 days, the Department of Energy is held accountable for a progress report on the American Recovery and Reinvestment Act. Update at 200 days, hosted by Matt Rogers, Senior Advisor to Secretary Steven Chu for Recovery Act Implementation.

  11. Recovery Act Milestones

    SciTech Connect

    Rogers, Matt

    2009-01-01

    Every 100 days, the Department of Energy is held accountable for a progress report on the American Recovery and Reinvestment Act. Update at 200 days, hosted by Matt Rogers, Senior Advisor to Secretary Steven Chu for Recovery Act Implementation.

  12. 75 FR 23795 - Notice of Proposed Information Collection: American Recovery and Reinvestment Act; Public and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... URBAN DEVELOPMENT Notice of Proposed Information Collection: American Recovery and Reinvestment Act... responses. This Notice also lists the following information: Title of Proposal: American Recovery and... information to HUD for the reporting Requirements of HUD ARRA Section 1512. (``Recovery Act'') grants....

  13. State and District Receipt of Recovery Act Funds. A Report from Charting the Progress of Education Reform: An Evaluation of the Recovery Act's Role. NCEE 2012-4057

    ERIC Educational Resources Information Center

    Garrison-Mogren, Roberta; Gutmann, Babette

    2012-01-01

    The American Recovery and Reinvestment Act (ARRA or the Recovery Act) of 2009 provided an unprecedented level of funding designed to "stimulate the economy in the short-term and invest wisely, using these funds to improve schools, raise achievement, drive reforms and produce better results for children and young people for the long-term health of…

  14. The American Recovery and Reinvestment Act: Opportunities for High School Improvement

    ERIC Educational Resources Information Center

    Rutenberg, David

    2009-01-01

    The American Recovery and Reinvestment Act (ARRA) creates a unique opportunity for states, districts, and high schools to work in concert on behalf of high school students. Generally, American Recovery and Reinvestment Act funds are not intended to create new programs; rather, the majority of the funds are intended to fill gaps in existing…

  15. 77 FR 9624 - Buy American Exception Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-17

    ... annual energy required for the home exceeds the amount that can be produced by the solar panels and thus... Reinvestment Act of 2009 (ARRA or Recovery Act), for a heat recovery ventilator necessary for a energy... is essential to meet the project objective, as it reduces the energy required to heat and cool...

  16. The End of an ARRA

    ERIC Educational Resources Information Center

    Vogel, Carl; Michaels, Claire; Wileden, Lydia

    2011-01-01

    In the winter of 2009, with more than 1.4 million job losses in the first two months of the year, the federal government passed the American Recovery and Reinvestment Act (ARRA) into law as a way to quickly inject liquidity into a stalling economy and maintain critical services that would allow individuals and communities to survive through the…

  17. Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA); Quarter 3 2012 Composite Data Products

    SciTech Connect

    Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.; Ainscough, C.; Saur, G.; Post, M.

    2013-01-01

    This report from the U.S. Department of Energy's National Renewable Energy Laboratory includes early fuel cell market composite data products for the third quarter of 2012 for American Recovery and Reinvestment Act (ARRA) and combined (IAA, DLA, ARRA) deployment projects.

  18. The American Recovery and Reinvestment Act: Opportunities for High School Improvement. Summary Table

    ERIC Educational Resources Information Center

    Rutenberg, David

    2009-01-01

    The American Recovery and Reinvestment Act (ARRA) creates a unique opportunity for states, districts, and high schools to work in concert on behalf of high school students. The table presented in this document provides information on best practices and resources related to the primary funding streams under the 2009 American Recovery and…

  19. Making the Most of the American Recovery and Reinvestment Act of 2009: A Guide for Full-Service School Leaders and Community Partners

    ERIC Educational Resources Information Center

    Gaughen, Katherine; Stewart, Nichole H.; LaVallee, Robert; Zvara, Alexandra

    2009-01-01

    To address the economic crisis facing the country, the President signed the American Recovery and Reinvestment Act (ARRA) into law on February 17, 2009. The ARRA offers numerous opportunities for full-service school leaders and may provide the necessary funding to prevent significant decreases in operating budgets. One of the largest investments…

  20. The American Recovery and Reinvestment Act: What It Means for Higher Education. Report 09-06

    ERIC Educational Resources Information Center

    Jones, Jessika

    2009-01-01

    On February 17, 2009, President Obama signed into law the American Recovery and Reinvestment Act of 2009 (ARRA). The Act commits $100 billion to education, with California education expected to receive over $8.5 billion. The largest part of the education stimulus package is the State Fiscal Stabilization Fund, of which California's slice is nearly…

  1. 77 FR 17456 - Buy American Exception Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-26

    ... Reinvestment Act of 2009 (ARRA or Recovery Act), for inverters necessary for the construction of a solar array system at NIST's WWVH radio station in Kauai, HI. FOR FURTHER INFORMATION CONTACT: Jason Gerloff... the amount of $1,415,000.00 to Adon Construction for the construction of a 120kw photovoltaic...

  2. State Implementation of Reforms Promoted under the Recovery Act. A Report from Charting the Progress of Education Reform: An Evaluation of the Recovery Act's Role. NCEE 2014-4011

    ERIC Educational Resources Information Center

    Webber, Ann; Troppe, Patricia; Milanowski, Anthony; Gutmann, Babette; Reisner, Elizabeth; Goertz, Margaret

    2014-01-01

    The American Recovery and Reinvestment Act (ARRA or the Recovery Act) of 2009 provided an unprecedented level of funding for K-12 education. The program created a "historic opportunity to save hundreds of thousands of jobs, support states and school districts, and advance reforms and improvements that will create long-lasting results for our…

  3. Finishing Strong in 2011: The Recovery Act at Work at Savannah River Site

    ScienceCinema

    None

    2016-07-12

    American Recovery and Reinvestment Act's highlights and accomplishments for 2011 projects. Covers the latest technology and robotics used for waste management. This video is an overview of the success ARRA brought to the Savannah River Site, the environment, the econonmy, and the surrounding communities.

  4. Seven Steps for States and Regions to Prepare for the American Recovery and Reinvestment Act

    ERIC Educational Resources Information Center

    Workforce Strategy Center, 2009

    2009-01-01

    Through the American Recovery and Reinvestment Act (ARRA) the federal government is pumping nearly $790 billion dollars into state and local coffers to strengthen the United States economy. In order to stimulate the economy as quickly as possible, states are being asked to invest much of this funding into regions within 30 days, and to have the…

  5. Early State Implementation of Title I School Improvement Grants under the Recovery Act

    ERIC Educational Resources Information Center

    McMurrer, Jennifer; Dietz, Shelby; Rentner, Diane Stark

    2011-01-01

    Over the next three years, states will dedicate an unprecedented amount of federal funding to school improvement efforts at approximately 5,000 of the nation's lowest achieving schools. The $100 billion for education appropriated by the American Recovery and Reinvestment Act of 2009 (ARRA), also known as the stimulus package, included an…

  6. West Virginia Guidebook for the Use of American Recovery and Reinvestment Act (AARA) Funds

    ERIC Educational Resources Information Center

    West Virginia Department of Education, 2009

    2009-01-01

    The overarching goals of the American Recovery and Reinvestment Act (ARRA) of 2009 are to immediately stimulate the economy in the short term and to invest in education and other essential public services that will ensure the long-term economic health of this nation. The United States Education Department (USED) offers guiding principles to be…

  7. Finishing Strong in 2011: The Recovery Act at Work at Savannah River Site

    SciTech Connect

    2011-01-01

    American Recovery and Reinvestment Act's highlights and accomplishments for 2011 projects. Covers the latest technology and robotics used for waste management. This video is an overview of the success ARRA brought to the Savannah River Site, the environment, the econonmy, and the surrounding communities.

  8. ARRA Funds Empower Schools to Power Down

    ERIC Educational Resources Information Center

    Pascopella, Angela

    2010-01-01

    When President Obama first signed the American Recovery and Reinvestment Act of 2009 (ARRA), he took much criticism for spending more money--$787 billion more--when the nation was reeling from decades-old debt, a more than 9 percent unemployment rate and a mortgage crisis. But this measure has allowed public school district leaders to invest in…

  9. Micro-Level Allocation of ARRA Funds

    ERIC Educational Resources Information Center

    Hayward, Jacob; Holt, Carleton

    2011-01-01

    The federal government, through the Department of Education, distributed millions of dollars to state education departments as part of the American Recovery and Restoration Act (ARRA). Many districts applied for and received thousands of dollars in order to make improvements to schools and impact student achievement. Several districts purchased…

  10. ARRA Material Handling Equipment Composite Data Products: Data through Quarter 2 of 2012

    SciTech Connect

    Kurtz, J.; Sprik, S.; Ramsden, T.; Ainscough, C.; Saur, G.

    2012-10-01

    This presentation from the U.S. Department of Energy's National Renewable Energy Laboratory includes American Recovery and Reinvestment Act (ARRA) fuel cell material handling equipment composite data products for data through the second quarter of 2012.

  11. ARRA Material Handling Equipment Composite Data Products: Data Through Quarter 4 of 2012

    SciTech Connect

    Kurtz, J.; Sprik, S.; Ainscough, C.; Saur, G.; Post, M.; Peters, M.; Ramsden, T.

    2013-05-01

    This presentation from the U.S. Department of Energy's National Renewable Energy Laboratory includes American Recovery and Reinvestment Act (ARRA) fuel cell material handling equipment composite data products for data through the fourth quarter of 2012.

  12. Opportunities in the American Recovery and Reinvestment Act for Supports and Services for Youth Transitioning from Foster Care

    ERIC Educational Resources Information Center

    Flynn-Khan, Margaret; Langford, Barbara Hanson

    2009-01-01

    To address the economic crisis facing the country, the President signed the American Recovery and Reinvestment Act (ARRA) into law on February 17, 2009. This sweeping legislation provides $789 billion to jumpstart the economy and boost employment. This act includes $463 billion in new spending and $326 billion in tax relief directed at those…

  13. Biomass Program Recovery Act Factsheet

    SciTech Connect

    2010-03-01

    The Biomass Program has awarded about $718 million in American Recovery and Reinvestment Act (Recovery Act) funds. The projects the Program is supporting are intended to: Accelerate advanced biofuels research, development, and demonstration; Speed the deployment and commercialization of advanced biofuels and bioproducts; Further the U.S. bioindustry through market transformation and creating or saving a range of jobs.

  14. Monitoring EERE's Recovery Act Portfolio

    SciTech Connect

    2011-01-01

    Performance monitoring of Recovery Act projects within EERE has been an ongoing effort. Project recipients have been reporting technical and financial progress to project officers on a quarterly basis.

  15. More to Do, But Less Capacity to Do It: States' Progress in Implementing the Recovery Act Education Reforms

    ERIC Educational Resources Information Center

    Kober, Nancy; Rentner, Diane Stark

    2011-01-01

    The American Recovery and Reinvestment Act of 2009 (ARRA), also known as the economic stimulus bill, channeled an unprecedented $100 billion into the nation's public education system. These funds were intended not only to avert teacher layoffs and stabilize state and local education budgets in the short term, but also to encourage reforms that…

  16. Realigning Resources for District Transformation: Using American Recovery and Reinvestment Act Funds to Advance a Strategic Education Reform Agenda

    ERIC Educational Resources Information Center

    Education Resource Strategies, 2009

    2009-01-01

    School districts and states have begun to receive education funds doled out from the American Recovery and Reinvestment Act, or ARRA, and many have a simple plan for the money--prevent teacher layoffs and restore current programs that were heading for the chopping block. This plan aligns with the legislation's intent to address the acute financial…

  17. Education Spending in the American Recovery and Reinvestment Act: Stimulating the Status Quo. WebMemo. No. 2868

    ERIC Educational Resources Information Center

    Burke, Lindsey

    2010-01-01

    The American Recovery and Reinvestment Act (ARRA), signed in February 2009, included nearly $100 billion in new funding for the Department of Education (DOE). Over $36 billion of it remains unspent, and bills in both the House and Senate are calling for even more funding for teacher jobs. It is unlikely that billions more in federal spending will…

  18. State Implementation and Perceptions of Title I School Improvement Grants under the Recovery Act: One Year Later

    ERIC Educational Resources Information Center

    McMurrer, Jennifer; McIntosh, Shelby

    2012-01-01

    The American Recovery and Reinvestment Act of 2009 (ARRA), also known as the stimulus package, appropriated $100 billion for education and included $3 billion for school improvement grants (SIGs) to help reform low-performing schools. This amount was in addition to the $546 million provided by the regular fiscal year 2009 appropriations bill for…

  19. Leveraging ARRA Funding for Developing Comprehensive State Longitudinal Data Systems

    ERIC Educational Resources Information Center

    Pfeiffer, Jay; Klein, Steven; Levesque, Karen

    2009-01-01

    The American Recovery and Reinvestment Act (ARRA) provides several funding opportunities that can assist states in designing, developing, and implementing statewide education longitudinal data systems. These new and enhanced information systems will enable states to track student progress within and across the secondary and postsecondary education…

  20. Investing Wisely and Quickly: Use of ARRA Funds in America's Great City Schools

    ERIC Educational Resources Information Center

    Naik, Manish; Yorkman, Michell; Casserly, Michael

    2010-01-01

    President Obama signed the American Recovery and Reinvestment Act of 2009 (the Recovery Act or ARRA) into law on February 17, 2009. This federal stimulus package provided an unprecedented infusion of new education aid for the nation's schools--more than $100 billion. To determine how the unprecedented federal infusion of education funding was…

  1. American Recovery and Reinvestment Act: Guide to Opportunities to Assure Children Are Healthy and Prepared to Succeed in School for "Making Connections" Communities

    ERIC Educational Resources Information Center

    Roy, Lisa; Griffen, Sarah

    2009-01-01

    The American Recovery and Reinvestment Act (ARRA) was signed into law by President Obama on Tuesday, February 17, 2009. It is the broadest and largest funding package in American history. The intent of the statute is to stimulate the economy both through direct spending on a range of programs and to create tax relief. The package makes investments…

  2. American Recovery and Reinvestment Act: A Guide to Entry-Level Jobs and Training and Education Opportunities for "Making Connections" Communities

    ERIC Educational Resources Information Center

    Griffen, Sarah

    2009-01-01

    The American Recovery and Reinvestment Act (ARRA) was signed into law by President Obama on Tuesday, February 17, 2009. It is the broadest and largest funding package in American history. The intent of the statute is to stimulate the economy both through direct spending on a range of programs and to create tax relief. Key to the stimulus is the…

  3. Which School Districts Qualified for Federal School Facility Funding under the American Recovery and Reinvestment Act of 2009? Evidence from Ohio

    ERIC Educational Resources Information Center

    Ingle, W. Kyle; Bowers, Alex J.; Davis, Thomas E.

    2014-01-01

    The American Recovery and Reinvestment Act of 2009 (ARRA) allocated $11 billion per year for 2009 and 2010 for qualified school construction bonds (QSCBs) for America's schools. From a historical perspective, this program is a broad transformation of the federal role in school facility funding. This study examined factors associated with federal…

  4. Faces of the Recovery Act: Sun Catalytix

    SciTech Connect

    Nocera, Dave

    2010-01-01

    BOSTON- At the Massachusetts Institute of Technology, Dan Nocera talks about Sun Catalytix, the next generation of solar energy, and ARPA-E funding through the Recovery Act. To learn about more ARPA-E projects through the Recovery Act: http://arpa-e.energy.gov/FundedProjects.aspx

  5. Faces of the Recovery Act: Sun Catalytix

    ScienceCinema

    Nocera, Dave

    2016-07-12

    BOSTON- At the Massachusetts Institute of Technology, Dan Nocera talks about Sun Catalytix, the next generation of solar energy, and ARPA-E funding through the Recovery Act. To learn about more ARPA-E projects through the Recovery Act: http://arpa-e.energy.gov/FundedProjects.aspx

  6. Recovery Act. Tapoco project. Cheoah upgrade

    SciTech Connect

    Tran, Paul

    2013-10-02

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  7. Faces of the Recovery Act: 1366 Technologies

    SciTech Connect

    Sachs, Ely; Mierlo, Frank van; Obama, Barack

    2010-01-01

    LEXINGTON, MA - At 1366 Technologies, Ely Sachs and Frank van Mierlo are using ARPA-E Recovery Act funding to dramatically reduce the costs of solar panel production. To read more about the project: http://arpa-e.energy.gov/FundedProjects.aspx#1366 To see more projects funded by the Recovery Act through ARPA-E: http://arpa-e.energy.gov/FundedProjects.aspx

  8. Faces of the Recovery Act: 1366 Technologies

    ScienceCinema

    Sachs, Ely; Mierlo, Frank van; Obama, Barack

    2016-07-12

    LEXINGTON, MA - At 1366 Technologies, Ely Sachs and Frank van Mierlo are using ARPA-E Recovery Act funding to dramatically reduce the costs of solar panel production. To read more about the project: http://arpa-e.energy.gov/FundedProjects.aspx#1366 To see more projects funded by the Recovery Act through ARPA-E: http://arpa-e.energy.gov/FundedProjects.aspx

  9. Savannah River Site, Liquid Waste Program, Savannah River Remediation American Recovery and Reinvestment Act Benefits and Lessons Learned - 12559

    SciTech Connect

    Schmitz, Mark A.; Crouse, Thomas N.

    2012-07-01

    Utilizing funding provided by the American Recovery and Reinvestment Act (ARRA), the Liquid Waste Program at Savannah River site successfully executed forty-one design, procurement, construction, and operating activities in the period from September 2009 through December 2011. Project Management of the program included noteworthy practices involving safety, integrated project teams, communication, and cost, schedule and risk management. Significant upgrades to plant capacity, progress toward waste tank closure and procurement of needed infrastructure were accomplished. Over 1.5 million hours were worked without a single lost work day case. Lessons Learned were continually identified and applied to enhance the program. Investment of Recovery Act monies into the Liquid Waste Program has ensured continued success in the disposition of radioactive wastes and the closure of high level waste tanks at SRS. The funding of a portion of the Liquid Waste Program at SRS by ARRA was a major success. Significant upgrades to plant capacity, progress toward waste tank closure and procurement of needed infrastructure was accomplished. Integrated Project Teams ensured quality products and services were provided to the Operations customers. Over 1.5 million hours were worked without a single lost work day case. Lessons Learned were continually reviewed and reapplied to enhance the program. Investment of Recovery Act monies into the Liquid Waste Program has ensured continued success in the disposition of radioactive wastes and the closure of high level waste tanks at SRS. (authors)

  10. NATIONAL EVALUATION OF THE WEATHERIZATION ASSISTANCE PROGRAM DURING THE ARRA PERIOD: PROGRAM YEARS 2009-2011

    SciTech Connect

    Tonn, Bruce Edward; Rose, Erin M; Schmoyer, Richard L; Eisenberg, Joel Fred; Ternes, Mark P; Schweitzer, Martin; Hendrick, Timothy P

    2012-08-01

    This report describes the third major evaluation of the Program, encompassing program years 2009 to 2011. In this report, this period of time is referred to as the ARRA Period. This is a special period of time for the Program because the American Recovery and Reinvestment Act (ARRA) of 2009 has allocated $5 billion of funding for the Program. In normal program years, WAP s annual appropriation is in the range of $200-250 million, supporting the weatherization of approximately 100,000 homes. With the addition of ARRA funding during these program years, the expectation is that weatherization activity will exceed 300,000 homes per year. In addition to saving energy and reducing low-income energy bills, expanded WAP funding is expected to stimulate the economy by providing new jobs in the weatherization field and allowing low-income households to spend more money on goods and services by spending less on energy.

  11. Did the 2009 American Recovery and Reinvestment Act affect dietary intake of low-income individuals?

    PubMed

    Waehrer, Geetha; Deb, Partha; Decker, Sandra L

    2015-12-01

    This paper examines the relationship between increased Supplemental Nutritional Assistance Program (SNAP) benefits following the 2009 American Recovery and Reinvestment Act (ARRA) and the diet quality of individuals from SNAP-eligible compared to ineligible (those with somewhat higher income) households using data from the 2007-2010 National Health and Nutrition Examination Survey. The ARRA increased SNAP monthly benefits by 13.6% of the maximum allotment for a given household size, equivalent to an increase of $24 to $144 for one-to-eight person households respectively. In the full sample, we find that these increases in SNAP benefits are not associated with changes in nutrient intake and diet quality. However, among those with no more than a high school education, higher SNAP benefits are associated with a 46% increase in the mean caloric share from sugar-sweetened beverages (SSBs) and a decrease in overall diet quality especially for those at the lower end of the diet quality distribution, amounting to a 9% decline at the 25th percentile. PMID:26414481

  12. Interactions between Energy Efficiency Programs funded under the Recovery Act and Utility Customer-Funded Energy Efficiency Programs

    SciTech Connect

    Goldman, Charles A.; Stuart, Elizabeth; Hoffman, Ian; Fuller, Merrian C.; Billingsley, Megan A.

    2011-02-25

    Since the spring of 2009, billions of federal dollars have been allocated to state and local governments as grants for energy efficiency and renewable energy projects and programs. The scale of this American Reinvestment and Recovery Act (ARRA) funding, focused on 'shovel-ready' projects to create and retain jobs, is unprecedented. Thousands of newly funded players - cities, counties, states, and tribes - and thousands of programs and projects are entering the existing landscape of energy efficiency programs for the first time or expanding their reach. The nation's experience base with energy efficiency is growing enormously, fed by federal dollars and driven by broader objectives than saving energy alone. State and local officials made countless choices in developing portfolios of ARRA-funded energy efficiency programs and deciding how their programs would relate to existing efficiency programs funded by utility customers. Those choices are worth examining as bellwethers of a future world where there may be multiple program administrators and funding sources in many states. What are the opportunities and challenges of this new environment? What short- and long-term impacts will this large, infusion of funds have on utility customer-funded programs; for example, on infrastructure for delivering energy efficiency services or on customer willingness to invest in energy efficiency? To what extent has the attribution of energy savings been a critical issue, especially where administrators of utility customer-funded energy efficiency programs have performance or shareholder incentives? Do the new ARRA-funded energy efficiency programs provide insights on roles or activities that are particularly well-suited to state and local program administrators vs. administrators or implementers of utility customer-funded programs? The answers could have important implications for the future of U.S. energy efficiency. This report focuses on a selected set of ARRA-funded energy

  13. Recovery Act Weekly Video: 200 West Drilling

    SciTech Connect

    2010-01-01

    President of Cascade Drilling, Bruce, talks about his contract with the Department of Energy and what his team is doing to improve water treatment and environmental cleanup. The small business owner hits on how the Recovery Act saved him from downsizing and helped him stay competitive and safe on site.

  14. Recovery Act Weekly Video: 200 West Drilling

    ScienceCinema

    None

    2016-07-12

    President of Cascade Drilling, Bruce, talks about his contract with the Department of Energy and what his team is doing to improve water treatment and environmental cleanup. The small business owner hits on how the Recovery Act saved him from downsizing and helped him stay competitive and safe on site.

  15. Report on all ARRA Funded Technical Work

    SciTech Connect

    None, None

    2013-10-05

    The main focus of this American Recovery and Reinvestment Act of 2009 (ARRA) funded project was to design an energy efficient carbon capture and storage (CCS) process using the Recipients membrane system for H{sub 2} separation and CO{sub 2} capture. In the ARRA-funded project, the Recipient accelerated development and scale-up of ongoing hydrogen membrane technology research and development (R&D). Specifically, this project focused on accelerating the current R&D work scope of the base program-funded project, involving lab scale tests, detail design of a 250 lb/day H{sub 2} process development unit (PDU), and scale-up of membrane tube and coating manufacturing. This project scope included the site selection and a Front End Engineering Design (FEED) study of a nominally 4 to 10 ton-per-day (TPD) Pre-Commercial Module (PCM) hydrogen separation membrane system. Process models and techno-economic analysis were updated to include studies on integration of this technology into an Integrated Gasification Combined Cycle (IGCC) power generation system with CCS.

  16. TAS: 89 0227: TAS Recovery Act - Optimization and Control of Electric Power Systems: ARRA

    SciTech Connect

    Chiang, Hsiao-Dong

    2014-02-01

    The name SuperOPF is used to refer several projects, problem formulations and soft-ware tools intended to extend, improve and re-define some of the standard methods of optimizing electric power systems. Our work included applying primal-dual interior point methods to standard AC optimal power flow problems of large size, as well as extensions of this problem to include co-optimization of multiple scenarios. The original SuperOPF problem formulation was based on co-optimizing a base scenario along with multiple post-contingency scenarios, where all AC power flow models and constraints are enforced for each, to find optimal energy contracts, endogenously determined locational reserves and appropriate nodal energy prices for a single period optimal power flow problem with uncertainty. This led to example non-linear programming problems on the order of 1 million constraints and half a million variables. The second generation SuperOPF formulation extends this by adding multiple periods and multiple base scenarios per period. It also incorporates additional variables and constraints to model load following reserves, ramping costs, and storage resources. A third generation of the multi-period SuperOPF, adds both integer variables and a receding horizon framework in which the problem type is more challenging (mixed integer), the size is even larger, and it must be solved more frequently, pushing the limits of currently available algorithms and solvers. The consideration of transient stability constraints in optimal power flow (OPF) problems has become increasingly important in modern power systems. Transient stability constrained OPF (TSCOPF) is a nonlinear optimization problem subject to a set of algebraic and differential equations. Solving a TSCOPF problem can be challenging due to (i) the differential-equation constraints in an optimization problem, (ii) the lack of a true analytical expression for transient stability in OPF. To handle the dynamics in TSCOPF, the set of differential equations can be approximated or converted into equivalent algebraic equations before they are included in an OPF formulation. In Chapter 4, a rigorous evaluation of using a predefined and fixed threshold for rotor angles as a mean to determine transient stability of the system is developed. TSCOPF can be modeled as a large-scale nonlinear programming problem including the constraints of differential-algebraic equations (DAE). Solving a TSCOPF problem can be challenging due to (i) the differential-equation constraints in an optimization problem, (ii) the lack of a true analytical expression for transient stability constraint in OPF. Unfortunately, even the current best TSCOPF solvers still suffer from the curse of dimensionality and unacceptable computational time, especially for large-scale power systems with multiple contingencies. In chapter 5, thse issues will be addressed and a new method to incorporate the transient stability constraints will be presented.

  17. 78 FR 48462 - Comment Request for Information Collection: American Recovery and Reinvestment Act (ARRA), High...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-08

    ... for a program of competitive grants for worker training and placement in high growth and emerging... strategies that move participants along green career pathways by: (1) Forging linkages between...

  18. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance for Geothermal Resource Evaluation Projects

    SciTech Connect

    Robert P. Breckenridge; Thomas R. Wood; Joel Renner

    2010-09-01

    The purpose of this document is to report on the evaluation of geothermal resource potential on and around three different United States (U. S.) Air Force Bases (AFBs): Nellis AFB and Air Force Range (AFR) in the State of Nevada (see maps 1 and 5), Holloman AFB in the State of New Mexico (see map 2), and Mountain Home AFB in the State of Idaho (see map 3). All three sites are located in semi-arid parts of the western U. S. The U. S. Air Force, through its Air Combat Command (ACC) located at Langley AFB in the State of Virginia, asked the Federal Energy Management Program (FEMP) for technical assistance to conduct technical and feasibility evaluations for the potential to identify viable geothermal resources on or around three different AFBs. Idaho National Laboratory (INL) is supporting FEMP in providing technical assistance to a number of different Federal Agencies. For this report, the three different AFBs are considered one project because they all deal with potential geothermal resource evaluations. The three AFBs will be evaluated primarily for their opportunity to develop a geothermal resource of high enough quality grade (i.e., temperature, productivity, depth, etc.) to consider the possibility for generation of electricity through a power plant. Secondarily, if the resource for the three AFBs is found to be not sufficient enough for electricity generation, then they will be described in enough detail to allow the base energy managers to evaluate if the resource is suitable for direct heating or cooling. Site visits and meetings by INL personnel with the staff at each AFB were held in late FY-2009 and FY-2010. This report provides a technical evaluation of the opportunities and challenges for developing geothermal resources on and around the AFBs. An extensive amount of literature and geographic information was evaluated as a part of this assessment. Resource potential maps were developed for each of the AFBs.

  19. ARRA-INPRVMNTS IN CMPTNG &CMMNC;RECOVERY ACT RESEARCH IN THEORETICAL HIGH ENERGY PHYSICS

    SciTech Connect

    THOMAS, SCOTT

    2011-03-15

    The RAID array of 80 terabytes of hard disk data storage that was purchased on this project and interfaced with the existing Rutgers high energy physics computer farm has been used in support of a number of research projects during the last budget period. Monte carlo simulations for the Large Hadron Collider (LHC) have been continued for multi-jet signatures. The additional disk storage supported by this project allowed next to leading order matching effects of QCD radiation to be included in this study. Simulations to validate the technique of shot-gun sequencing of cascade decay trees in multi-dimensional Dalitz spaces have also been advanced. The results of this work will be applied to searches for quantum dimensions at the LHC. Simulations to investigate the possibility of extending these techniques to the search for the Higgs boson are also underway. The funds supporting this project have been entirely expended during the last period.

  20. 45 CFR 2543.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Resource Conservation and Recovery Act. 2543.16... OTHER NON-PROFIT ORGANIZATIONS Pre-Award Requirements § 2543.16 Resource Conservation and Recovery Act. Under the Act Resource Conservation and Recovery Act (42 U.S.C. 6962), any State agency or agency of...

  1. 45 CFR 2543.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Resource Conservation and Recovery Act. 2543.16... OTHER NON-PROFIT ORGANIZATIONS Pre-Award Requirements § 2543.16 Resource Conservation and Recovery Act. Under the Act Resource Conservation and Recovery Act (42 U.S.C. 6962), any State agency or agency of...

  2. 45 CFR 2543.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Resource Conservation and Recovery Act. 2543.16... OTHER NON-PROFIT ORGANIZATIONS Pre-Award Requirements § 2543.16 Resource Conservation and Recovery Act. Under the Act Resource Conservation and Recovery Act (42 U.S.C. 6962), any State agency or agency of...

  3. Savannah River Site Footprint Reduction Results under the American Recovery and Reinvestment Act - 13302

    SciTech Connect

    Flora, Mary; Adams, Angelia; Pope, Robert

    2013-07-01

    The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, managed and operated by Savannah River Nuclear Solutions. Construction of SRS began in the early 1950's to enhance the nation's nuclear weapons capability. Nuclear weapons material production began in the early 1950's, eventually utilizing five production reactors constructed to support the national defense mission. Past operations have resulted in releases of hazardous constituents and substances to soil and groundwater, resulting in 515 waste sites with contamination exceeding regulatory thresholds. More than 1,000 facilities were constructed onsite with approximately 300 of them considered radiological, nuclear or industrial in nature. In 2003, SRS entered into a Memorandum of Agreement with its regulators to accelerate the cleanup using an Area Completion strategy. The strategy was designed to focus cleanup efforts on the 14 large industrial areas of the site to realize efficiencies of scale in the characterization, assessment, and remediation activities. This strategy focuses on addressing the contaminated surface units and the vadose zone and addressing groundwater plumes subsequently. This approach streamlines characterization and remediation efforts as well as the required regulatory documentation, while enhancing the ability to make large-scale cleanup decisions. In February 2009, Congress approved the American Reinvestment and Recovery Act (ARRA) to create jobs and promote economic recovery. At SRS, ARRA funding was established in part to accelerate the completion of environmental remediation and facility deactivation and decommissioning (D and D). By late 2012, SRS achieved 85 percent footprint reduction utilizing ARRA funding by accelerating and coupling waste unit remediation with D and D of remnant facilities. Facility D and D activities were sequenced and permitted with

  4. 29 CFR 95.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 1 2012-07-01 2012-07-01 false Resource Conservation and Recovery Act. 95.16 Section 95.16... Requirements § 95.16 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40...

  5. 34 CFR 74.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 1 2014-07-01 2014-07-01 false Resource Conservation and Recovery Act. 74.16 Section... Requirements § 74.16 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act... Agency (EPA) (40 CFR parts 247-254). Accordingly, recipients that receive direct Federal awards or...

  6. 22 CFR 145.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Resource Conservation and Recovery Act. 145.16... Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act (RCRA) (Pub. L. 94... materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts...

  7. 32 CFR 32.49 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 1 2014-07-01 2014-07-01 false Resource Conservation and Recovery Act. 32.49....49 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act (RCRA... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40...

  8. 34 CFR 74.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 1 2012-07-01 2012-07-01 false Resource Conservation and Recovery Act. 74.16 Section... Requirements § 74.16 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act... Agency (EPA) (40 CFR parts 247-254). Accordingly, recipients that receive direct Federal awards or...

  9. 32 CFR 32.49 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false Resource Conservation and Recovery Act. 32.49....49 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act (RCRA... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40...

  10. 22 CFR 145.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Resource Conservation and Recovery Act. 145.16... Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act (RCRA) (Pub. L. 94... materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts...

  11. 22 CFR 145.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Resource Conservation and Recovery Act. 145.16... Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act (RCRA) (Pub. L. 94... materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts...

  12. 7 CFR 3019.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Resource Conservation and Recovery Act. 3019.16... Requirements § 3019.16 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40...

  13. 32 CFR 32.49 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 1 2013-07-01 2013-07-01 false Resource Conservation and Recovery Act. 32.49....49 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act (RCRA... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40...

  14. 7 CFR 3019.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Resource Conservation and Recovery Act. 3019.16... Requirements § 3019.16 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40...

  15. 29 CFR 95.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 1 2011-07-01 2011-07-01 false Resource Conservation and Recovery Act. 95.16 Section 95.16... Requirements § 95.16 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40...

  16. 29 CFR 95.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 1 2013-07-01 2013-07-01 false Resource Conservation and Recovery Act. 95.16 Section 95.16... Requirements § 95.16 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40...

  17. 22 CFR 145.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts 247... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Resource Conservation and Recovery Act. 145.16... Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act (RCRA) (Pub. L....

  18. 32 CFR 32.49 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR... 32 National Defense 1 2012-07-01 2012-07-01 false Resource Conservation and Recovery Act. 32.49....49 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act...

  19. 32 CFR 32.49 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR... 32 National Defense 1 2010-07-01 2010-07-01 false Resource Conservation and Recovery Act. 32.49....49 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act...

  20. 22 CFR 145.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts 247... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Resource Conservation and Recovery Act. 145.16... Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act (RCRA) (Pub. L....

  1. 24 CFR 84.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Resource Conservation and Recovery... Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act (RCRA) (Pub. L. 94... guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts 247 through 254)....

  2. 20 CFR 435.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false Resource Conservation and Recovery Act. 435... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Pre-Award Requirements § 435.16 Resource Conservation and Recovery... Federal funds must comply with section 6002 of the Resource Conservation and Recovery Act (Public Law...

  3. 24 CFR 84.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Resource Conservation and Recovery... Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act (RCRA) (Pub. L. 94... guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts 247 through 254)....

  4. 24 CFR 84.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Resource Conservation and Recovery... Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act (RCRA) (Pub. L. 94... guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts 247 through 254)....

  5. 7 CFR 3019.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR... 7 Agriculture 15 2012-01-01 2012-01-01 false Resource Conservation and Recovery Act. 3019.16... Requirements § 3019.16 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery...

  6. 29 CFR 95.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR... 29 Labor 1 2014-07-01 2013-07-01 true Resource Conservation and Recovery Act. 95.16 Section 95.16... Requirements § 95.16 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery...

  7. 7 CFR 3019.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR... 7 Agriculture 15 2013-01-01 2013-01-01 false Resource Conservation and Recovery Act. 3019.16... Requirements § 3019.16 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery...

  8. 24 CFR 84.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts 247 through 254). Accordingly... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Resource Conservation and Recovery... Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act (RCRA) (Pub. L....

  9. 34 CFR 74.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Agency (EPA) (40 CFR parts 247-254). Accordingly, recipients that receive direct Federal awards or other... 34 Education 1 2013-07-01 2013-07-01 false Resource Conservation and Recovery Act. 74.16 Section... Requirements § 74.16 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery...

  10. 34 CFR 74.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Agency (EPA) (40 CFR parts 247-254). Accordingly, recipients that receive direct Federal awards or other... 34 Education 1 2011-07-01 2011-07-01 false Resource Conservation and Recovery Act. 74.16 Section... Requirements § 74.16 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery...

  11. 24 CFR 84.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts 247 through 254). Accordingly... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Resource Conservation and Recovery... Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act (RCRA) (Pub. L....

  12. 29 CFR 95.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR... 29 Labor 1 2010-07-01 2010-07-01 true Resource Conservation and Recovery Act. 95.16 Section 95.16... Requirements § 95.16 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery...

  13. 7 CFR 3019.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR... 7 Agriculture 15 2010-01-01 2010-01-01 false Resource Conservation and Recovery Act. 3019.16... Requirements § 3019.16 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery...

  14. Investing American Recovery and Reinvestment Act Funds to Advance Capability, Reliability, and Performance in NASA Wind Tunnels

    NASA Technical Reports Server (NTRS)

    Sydnor, Goerge H.

    2010-01-01

    The National Aeronautics and Space Administration's (NASA) Aeronautics Test Program (ATP) is implementing five significant ground-based test facility projects across the nation with funding provided by the American Recovery and Reinvestment Act (ARRA). The projects were selected as the best candidates within the constraints of the ARRA and the strategic plan of ATP. They are a combination of much-needed large scale maintenance, reliability, and system upgrades plus creating new test beds for upcoming research programs. The projects are: 1.) Re-activation of a large compressor to provide a second source for compressed air and vacuum to the Unitary Plan Wind Tunnel at the Ames Research Center (ARC) 2.) Addition of high-altitude ice crystal generation at the Glenn Research Center Propulsion Systems Laboratory Test Cell 3, 3.) New refrigeration system and tunnel heat exchanger for the Icing Research Tunnel at the Glenn Research Center, 4.) Technical viability improvements for the National Transonic Facility at the Langley Research Center, and 5.) Modifications to conduct Environmentally Responsible Aviation and Rotorcraft research at the 14 x 22 Subsonic Tunnel at Langley Research Center. The selection rationale, problem statement, and technical solution summary for each project is given here. The benefits and challenges of the ARRA funded projects are discussed. Indirectly, this opportunity provides the advantages of developing experience in NASA's workforce in large projects and maintaining corporate knowledge in that very unique capability. It is envisioned that improved facilities will attract a larger user base and capabilities that are needed for current and future research efforts will offer revenue growth and future operations stability. Several of the chosen projects will maximize wind tunnel reliability and maintainability by using newer, proven technologies in place of older and obsolete equipment and processes. The projects will meet NASA's goal of

  15. 49 CFR 19.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 1 2013-10-01 2013-10-01 false Resource Conservation and Recovery Act. 19.16... ORGANIZATIONS Pre-Award Requirements § 19.16 Resource Conservation and Recovery Act. Under the Act, any State... Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions...

  16. 22 CFR 518.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 2 2014-04-01 2014-04-01 false Resource Conservation and Recovery Act. 518.16... ORGANIZATIONS Pre-Award Requirements § 518.16 Resource Conservation and Recovery Act. Under the Act, any State... Environmental Protection Agency (EPA) (40 CFR Parts 247-254). Accordingly, State and local institutions...

  17. 10 CFR 600.116 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Resource Conservation and Recovery Act. 600.116 Section... Conservation and Recovery Act. Under the Act (Pub. L. 94-580 codified at 42 U.S.C. 6962), any State agency or... Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions of higher...

  18. 10 CFR 600.116 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Resource Conservation and Recovery Act. 600.116 Section... Conservation and Recovery Act. Under the Act (Pub. L. 94-580 codified at 42 U.S.C. 6962), any State agency or... Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions of higher...

  19. 22 CFR 518.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 2 2013-04-01 2009-04-01 true Resource Conservation and Recovery Act. 518.16... ORGANIZATIONS Pre-Award Requirements § 518.16 Resource Conservation and Recovery Act. Under the Act, any State... Environmental Protection Agency (EPA) (40 CFR Parts 247-254). Accordingly, State and local institutions...

  20. 22 CFR 518.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 2 2012-04-01 2009-04-01 true Resource Conservation and Recovery Act. 518.16... ORGANIZATIONS Pre-Award Requirements § 518.16 Resource Conservation and Recovery Act. Under the Act, any State... Environmental Protection Agency (EPA) (40 CFR Parts 247-254). Accordingly, State and local institutions...

  1. 49 CFR 19.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions of... 49 Transportation 1 2014-10-01 2014-10-01 false Resource Conservation and Recovery Act. 19.16... ORGANIZATIONS Pre-Award Requirements § 19.16 Resource Conservation and Recovery Act. Under the Act, any...

  2. 49 CFR 19.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions of... 49 Transportation 1 2012-10-01 2012-10-01 false Resource Conservation and Recovery Act. 19.16... ORGANIZATIONS Pre-Award Requirements § 19.16 Resource Conservation and Recovery Act. Under the Act, any...

  3. 49 CFR 19.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions of... 49 Transportation 1 2011-10-01 2011-10-01 false Resource Conservation and Recovery Act. 19.16... ORGANIZATIONS Pre-Award Requirements § 19.16 Resource Conservation and Recovery Act. Under the Act, any...

  4. 22 CFR 518.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Environmental Protection Agency (EPA) (40 CFR Parts 247-254). Accordingly, State and local institutions of... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Resource Conservation and Recovery Act. 518.16... ORGANIZATIONS Pre-Award Requirements § 518.16 Resource Conservation and Recovery Act. Under the Act, any...

  5. 22 CFR 518.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Environmental Protection Agency (EPA) (40 CFR Parts 247-254). Accordingly, State and local institutions of... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Resource Conservation and Recovery Act. 518.16... ORGANIZATIONS Pre-Award Requirements § 518.16 Resource Conservation and Recovery Act. Under the Act, any...

  6. 49 CFR 19.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions of... 49 Transportation 1 2010-10-01 2010-10-01 false Resource Conservation and Recovery Act. 19.16... ORGANIZATIONS Pre-Award Requirements § 19.16 Resource Conservation and Recovery Act. Under the Act, any...

  7. National Weatherization Assistance Program Characterization Describing the Recovery Act Period

    SciTech Connect

    Tonn, Bruce Edward; Rose, Erin M.; Hawkins, Beth A.

    2015-10-01

    This report characterizes the U.S. Department of Energy s Weatherization Assistance Program (WAP) during the American Recovery and Reinvestment Act of 2009 (Recovery Act) period. This research was one component of the Recovery Act evaluation of WAP. The report presents the results of surveys administered to Grantees (i.e., state weatherization offices) and Subgrantees (i.e., local weatherization agencies). The report also documents the ramp up and ramp down of weatherization production and direct employment during the Recovery Act period and other challenges faced by the Grantees and Subgrantees during this period. Program operations during the Recovery Act (Program Year 2010) are compared to operations during the year previous to the Recovery Act (Program Year 2008).

  8. 2 CFR 215.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 2 Grants and Agreements 1 2013-01-01 2013-01-01 false Resource Conservation and Recovery Act. 215... ORGANIZATIONS (OMB CIRCULAR A-110) Pre-Award Requirements § 215.16 Resource Conservation and Recovery Act. Under... developed by the Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and...

  9. 36 CFR 1210.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false Resource Conservation and... Conservation and Recovery Act. Under the Resource Conservation and Recovery Act ((RCRA) (Pub. L. 94-580... identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR Parts 247 through...

  10. 36 CFR 1210.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Resource Conservation and... Conservation and Recovery Act. Under the Resource Conservation and Recovery Act ((RCRA) (Pub. L. 94-580... identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR Parts 247 through...

  11. 2 CFR 215.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... developed by the Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local... 2 Grants and Agreements 1 2012-01-01 2012-01-01 false Resource Conservation and Recovery Act. 215... ORGANIZATIONS (OMB CIRCULAR A-110) Pre-Award Requirements § 215.16 Resource Conservation and Recovery Act....

  12. 2 CFR 215.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... developed by the Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false Resource Conservation and Recovery Act. 215... ORGANIZATIONS (OMB CIRCULAR A-110) Pre-Award Requirements § 215.16 Resource Conservation and Recovery Act....

  13. 3 CFR - Combating Noncompliance With Recovery Act Reporting Requirements

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 3 The President 1 2011-01-01 2011-01-01 false Combating Noncompliance With Recovery Act Reporting Requirements Presidential Documents Other Presidential Documents Memorandum of April 6, 2010 Combating Noncompliance With Recovery Act Reporting Requirements Memorandum for the Heads of Executive Departments and Agencies My Administration...

  14. Department of Energy Recovery Act Investment in Biomass Technologies

    SciTech Connect

    2010-11-01

    The American Recovery and Reinvestment Act of 2009 (Recovery Act) provided more than $36 billion to the Department of Energy (DOE) to accelerate work on existing projects, undertake new and transformative research, and deploy clean energy technologies across the nation. Of this funding, $1029 million is supporting innovative work to advance biomass research, development, demonstration, and deployment.

  15. 36 CFR 1210.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR Parts 247 through 254... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Resource Conservation and... Conservation and Recovery Act. Under the Resource Conservation and Recovery Act ((RCRA) (Pub. L....

  16. 20 CFR 435.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Federal funds must comply with section 6002 of the Resource Conservation and Recovery Act (Public Law 94... 20 Employees' Benefits 2 2013-04-01 2013-04-01 false Resource Conservation and Recovery Act. 435... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Pre-Award Requirements § 435.16 Resource Conservation and...

  17. Recovery Act Incentives for Wind Energy Equipment Manufacturing

    SciTech Connect

    2009-10-01

    This document lists some of the federal incentives available to manufacturers of wind energy equipment. These incentives were authorized by or expanded under the American Recovery and Reinvestment Act of 2009.

  18. 45 CFR 2543.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions of higher education... 45 Public Welfare 4 2012-10-01 2012-10-01 false Resource Conservation and Recovery Act. 2543.16... OTHER NON-PROFIT ORGANIZATIONS Pre-Award Requirements § 2543.16 Resource Conservation and Recovery...

  19. 45 CFR 2543.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions of higher education... 45 Public Welfare 4 2010-10-01 2010-10-01 false Resource Conservation and Recovery Act. 2543.16... OTHER NON-PROFIT ORGANIZATIONS Pre-Award Requirements § 2543.16 Resource Conservation and Recovery...

  20. Medium Duty ARRA Data Reporting and Analysis (Presentation)

    SciTech Connect

    Walkowicz, K.

    2014-06-01

    This project compiles medium-duty (MD) aggregated deployment data and provides the compiled detailed analyses to industry. The U.S. Department of Energy's (DOE's) American Recovery and Reinvestment Act (ARRA) deployment and demonstration projects are helping to commercialize technologies for all-electric vehicles, electrified accessories, and electric charging infrastructure. Over 3.2 million miles of in-service all-electric MD truck data from 560 different vehicles have been collected since 2011, and usage data from over 1,000 truck electrification sites have been collected since 2013. Through the DOE's Vehicle Technologies Office, NREL is working to analyze real-time data from these deployment and demonstration projects to quantify the benefits: results and summary statistics are made available through the NREL website as quarterly and annual reports; 23 aggregated reports have been published on the performance and operation of these vehicles; and detailed data are being extracted to help further understand battery use and performance.

  1. Environmental Emissions Nonenergy Benefits Working Paper: ARRA Period

    SciTech Connect

    Carroll, David; Bausch, Daniel

    2015-03-01

    Weatherization reduces energy usage by low-income households, and thereby reduces the environmental impacts of the production and consumption of energy and reduces the social costs associated with those environmental impacts. The nonenergy benefits study conducted as part of the American Recovery and Reinvestment Act of 2009 (ARRA) Weatherization Assistance Program (WAP) evaluation focused on measuring the emissions reductions resulting from WAP program energy usage reductions and estimating the societal value of those emission reductions. While there are other environmental impacts associated with the WAP program, this study focused on emissions impacts because the 2010 National Research Council (NRC) report Hidden Costs of Energy: The Unpriced Consequences of Energy Production and Use recommended that Congress focus on emissions costs because they have the highest documented social impact costs

  2. Highlights from U.S. Department of Energy's Fuel Cell Recovery Act Projects

    SciTech Connect

    Fuel Cell Technologies Office

    2012-05-01

    This fact sheets highlights U.S. Department of Energy fuel cell projects funded by the American Recovery and Reinvestment Act of 2009 (Recovery Act). More than 1,000 fuel cell systems have been deployed through Recovery Act funding.

  3. 78 FR 48867 - Nationwide Categorical Waivers Under the American Recovery and Reinvestment Act of 2009 (Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-12

    ... 1605 of the Recovery Act under the authority of Section 1605(b)(2), (iron, steel, and the relevant... American provision) if the iron, steel, or relevant manufactured good is not produced or manufactured...

  4. 78 FR 49264 - Nationwide Categorical Waivers Under the American Recovery and Reinvestment Act of 2009 (Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-13

    ... section 1605 of the Recovery Act under the authority of Section 1605(b)(2), (iron, steel, and the relevant... inapplicability'' (a waiver of the Buy American provision) if the iron, steel, or relevant manufactured good...

  5. 77 FR 4029 - Nationwide Categorical Waivers Under the American Recovery and Reinvestment Act of 2009 (Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-26

    ... 1605 of the Recovery Act under the authority of Section 1605(b)(2), (iron, steel, and the relevant... inapplicability'' (a waiver of the Buy American provision) if the iron, steel, or relevant manufactured good...

  6. Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

    SciTech Connect

    Stephens, Jessica D.

    2013-05-29

    On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently

  7. 75 FR 30799 - Notice of a Waiver of Section 1605 of the American Recovery and Reinvestment Act of 2009 (ARRA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ... imported T8 4-foot electronic ballasts in the Poplar District's lighting project, which is supported with... to use these funds for a lighting project, but reports that the particular lights needed (T8 4-foot... American Requirements for the Poplar District's lighting project. This notice constitutes the...

  8. American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 279 IMCOM-Southeast Region: Redstone Arsenal

    SciTech Connect

    Hatley, Darrel D.; Goddard, James K.

    2010-09-30

    Report describing a building retuning workshop presented to staff at Redstone Arsenal. Document includes issues identified during building audits and recommendations for future activities to reduce energy use at the site.

  9. 77 FR 5516 - Notice of a Project Waiver of the American Recovery and Reinvestment Act of 2009 (ARRA) to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ... 176.80(a)(1) states (at 77 FR 18452) that ``The determinations of nonavailability of the articles... the Laurel Creek Restoration Project in Twinsburg, Ohio, for coconut fiber (coir) woven mats to be.... The County contends that coconut fibers are more durable than straw and other materials used...

  10. 75 FR 3375 - School Improvement Grants; American Recovery and Reinvestment Act of 2009 (ARRA); Title I of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-21

    ... requirements for the SIG program in the Federal Register on December 10, 2009 (74 FR 65618). Subsequently, on..., 2009 (74 FR 65618) as follows: 1. Section I.A.1 is amended to read as follows: 1. Greatest need. An LEA... the final requirements for School Improvement Grants (SIG) authorized under section 1003(g) of Title...

  11. 75 FR 66363 - School Improvement Grants; American Recovery and Reinvestment Act of 2009 (ARRA); Title I of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ... final requirements for the SIG program in the Federal Register on December 10, 2009 (74 FR 65618... interim final requirements for the SIG program in the Federal Register (75 FR 3375) to incorporate this... requirements (75 FR 3375, 3376-80), the Secretary adopts as final the interim final requirements as follows:...

  12. 75 FR 36646 - Notice of a Waiver of Section 1605 of the American Recovery and Reinvestment Act of 2009 (ARRA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ... suppression equipment in the Indian River District's telecommunications project, which is supported with... as American Power Conversion (APC) power supply and surge suppression equipment. While both Cisco and..., and software or APC power supply and surge suppression equipment manufactured in the United States....

  13. American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 224 Altus Air Force Base Solar Technologies

    SciTech Connect

    Russo, Bryan J.

    2010-09-30

    The principal goal of this project was to evaluate altus Air Force Base for building integrated silicon or thin film module photovoltaic opportunities. This report documents PNNL's efforts and documents study conclusions.

  14. Y-12 National Security Complex's Sustainable Recovery and Transformation - 12420

    SciTech Connect

    Jackson, Jan; Widman, Jeannette

    2012-07-01

    American Recovery and Reinvestment Act (ARRA) funds were used at the Y-12 National Security Complex (Y-12) to remove legacy materials from large contaminated excess facilities in order to prepare the facilities for demolition, demolish five excess buildings, and clean up sources of environmental contamination. The legacy materials and buildings presented many challenges and the potential hazards included depleted uranium and other radiological contaminants, lead, polychlorinated biphenyls, Freon, mold, mildew, asbestos, beryllium and mercury. Y-12 project teams have integrated sustainable waste management practices into each of the seven ARRA projects. The ARRA clean up efforts have resulted in the reduction of potential environmental, health, and safety risks posed by the excess facilities and sources of environmental contamination. Y-12's ARRA project teams focused on completing the activities in a sustainable, timely and safe manner. The site utilized a systematic material disposition evaluation process to ensure that materials were not automatically dis-positioned as waste. ARRA projects have recycled or reused over 1.3 million pounds of materials while preventing over 3 million vehicle miles traveled for waste disposal. Y-12 ARRA projects have worked over 2 million safe work hours without a lost time injury. The site has already begun to beneficially reuse land cleared by ARRA project activities to support sustainable transformation efforts. The Y-12 ARRA project activities have demonstrated that large complex projects can be completed sustainably and safely while maintaining an aggressive schedule. Through careful planning and execution, ARRA projects at the site have sustainably reduced the potential environmental, health, and safety risks posed to site employees and the community by the excess facilities and sources of environmental contamination. Y-12's systematic material disposition process ensured that materials were not automatically assumed to be

  15. 22 CFR 226.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Resource Conservation and Recovery Act. 226.16... TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Pre-award Requirements § 226.16 Resource Conservation and... identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts...

  16. 22 CFR 226.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Resource Conservation and Recovery Act. 226.16... TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Pre-award Requirements § 226.16 Resource Conservation and... identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts...

  17. 22 CFR 226.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Resource Conservation and Recovery Act. 226.16... TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Pre-award Requirements § 226.16 Resource Conservation and... identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts...

  18. 10 CFR 600.116 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions of higher education... 10 Energy 4 2013-01-01 2013-01-01 false Resource Conservation and Recovery Act. 600.116 Section... Education, Hospitals, and Other Nonprofit Organizations Pre-Award Requirements § 600.116...

  19. 22 CFR 226.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts 247-254... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Resource Conservation and Recovery Act. 226.16... TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Pre-award Requirements § 226.16 Resource Conservation...

  20. 10 CFR 600.116 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions of higher education... 10 Energy 4 2014-01-01 2014-01-01 false Resource Conservation and Recovery Act. 600.116 Section... Education, Hospitals, and Other Nonprofit Organizations Pre-Award Requirements § 600.116...

  1. 20 CFR 435.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Environmental Protection Agency (EPA) (40 CFR parts 247 through 254). Accordingly, State and local institutions... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false Resource Conservation and Recovery Act. 435... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Pre-Award Requirements § 435.16 Resource Conservation and...

  2. Faces of the Recovery Act: The Impact of Smart Grid

    ScienceCinema

    President Obama

    2016-07-12

    On October 27th, Baltimore Gas & Electric was selected to receive $200 million for Smart Grid innovation projects under the Recovery Act. Watch as members of their team, along with President Obama, explain how building a smarter grid will help consumers cut their utility bills, battle climate change and create jobs.

  3. Faces of the Recovery Act: The Impact of Smart Grid

    SciTech Connect

    President Obama

    2009-11-24

    On October 27th, Baltimore Gas & Electric was selected to receive $200 million for Smart Grid innovation projects under the Recovery Act. Watch as members of their team, along with President Obama, explain how building a smarter grid will help consumers cut their utility bills, battle climate change and create jobs.

  4. 22 CFR 226.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts 247-254... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Resource Conservation and Recovery Act. 226.16... TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Pre-award Requirements § 226.16 Resource Conservation...

  5. 10 CFR 600.116 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions of higher education... 10 Energy 4 2010-01-01 2010-01-01 false Resource Conservation and Recovery Act. 600.116 Section... Education, Hospitals, and Other Nonprofit Organizations Pre-Award Requirements § 600.116...

  6. 20 CFR 435.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Environmental Protection Agency (EPA) (40 CFR parts 247 through 254). Accordingly, State and local institutions... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Resource Conservation and Recovery Act. 435... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Pre-Award Requirements § 435.16 Resource Conservation and...

  7. 20 CFR 435.16 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Environmental Protection Agency (EPA) (40 CFR parts 247 through 254). Accordingly, State and local institutions... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Resource Conservation and Recovery Act. 435... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Pre-Award Requirements § 435.16 Resource Conservation and...

  8. Recovery Act Weekly Video: Upper ALE Building Demolition

    ScienceCinema

    None

    2016-07-12

    CH2MHILL Plateau Remediation Company demolition of 6652C Space Science Laboratory. The largest building atop Rattlesnake Mountain, the laboratory served as a nightly radar patrol center as well as a barracks. The Recovery Act funded project is helping reduce the site footprint.

  9. 200,000 homes weatherized under the Recovery Act

    SciTech Connect

    Zoi, Cathy

    2010-01-01

    Today Vice President Biden announced that the Weatherization Assistance Program has weatherized 200,000 homes under the Recovery Act. We're taking your questions and comments right now on weatherization. Join in the conversation! *Facebook -- http://www.facebook.com/energygov *Twitter -- http://www.twitter.com/energy

  10. 200,000 homes weatherized under the Recovery Act

    ScienceCinema

    Zoi, Cathy

    2016-07-12

    Today Vice President Biden announced that the Weatherization Assistance Program has weatherized 200,000 homes under the Recovery Act. We're taking your questions and comments right now on weatherization. Join in the conversation! *Facebook -- http://www.facebook.com/energygov *Twitter -- http://www.twitter.com/energy

  11. An industrial application of the JPL ACTS with energy recovery

    NASA Technical Reports Server (NTRS)

    Humphrey, M. F.; Wilson, G. E.; Schroepfer, T. W.

    1980-01-01

    The JPL Activated Carbon Treatment System (ACTS) uses sewage solids derived from municipal wastewater treatment systems as a source of organic material for powdered activated carbons (PAC). The PAC is used for the COD removal from wastewater and as a filter aid in the recovery of additional sewage solids.

  12. An industrial application of the JPL ACTS with energy recovery

    NASA Astrophysics Data System (ADS)

    Humphrey, M. F.; Wilson, G. E.; Schroepfer, T. W.

    1980-09-01

    The JPL Activated Carbon Treatment System (ACTS) uses sewage solids derived from municipal wastewater treatment systems as a source of organic material for powdered activated carbons (PAC). The PAC is used for the COD removal from wastewater and as a filter aid in the recovery of additional sewage solids.

  13. Argonne Director Eric Isaacs talks about ARRA funding at Argonne

    ScienceCinema

    Isaacs, Eric

    2016-07-12

    Argonne is set to receive over $150 million in stimulus funds. Director Eric Isaacs describes how these funds will be put to good use—hiring employees and contractors, cleaning up the nuclear footprint, and investing in technologies for America's future. More info on Argonne and ARRA here: http://www.anl.gov/recovery/index.html

  14. Argonne Director Eric Isaacs talks about ARRA funding at Argonne

    SciTech Connect

    Isaacs, Eric

    2009-01-01

    Argonne is set to receive over $150 million in stimulus funds. Director Eric Isaacs describes how these funds will be put to good use—hiring employees and contractors, cleaning up the nuclear footprint, and investing in technologies for America's future. More info on Argonne and ARRA here: http://www.anl.gov/recovery/index.html

  15. The Recovery Act is "Lighting Up" the streets of Philadelphia

    SciTech Connect

    Nutter, Michael; Gajewski, Katherine; Russell, Toby; Williams, Doug; Best, DeLain

    2010-01-01

    The Philadelphia Streets Department is converting 58,000 yellow and green traffic signals and will replace approximately 27,000 red LED lights that have come to the end of their useful life. The project will use approximately $3 million in EECBG funds, matched with $3 million in PECO funding, and will save the city approximately $1 million in electric costs each year. For more information on Recovery Act projects funded by the Department of Energy in Pennsylvania: http://www.energy.gov/recovery/pa.htm

  16. The Recovery Act is "Lighting Up" the streets of Philadelphia

    ScienceCinema

    Nutter, Michael; Gajewski, Katherine; Russell, Toby; Williams, Doug; Best, DeLain

    2016-07-12

    The Philadelphia Streets Department is converting 58,000 yellow and green traffic signals and will replace approximately 27,000 red LED lights that have come to the end of their useful life. The project will use approximately $3 million in EECBG funds, matched with $3 million in PECO funding, and will save the city approximately $1 million in electric costs each year. For more information on Recovery Act projects funded by the Department of Energy in Pennsylvania: http://www.energy.gov/recovery/pa.htm

  17. Recovery Act update from Sr. Advisor Matt Rogers -- End of Obligations

    ScienceCinema

    Rogers, Matt

    2016-07-12

    Senior Advisor to the Secretary for Recovery Act Implementation Matt Rogers shares his thoughts as the Recovery Act reaches a critical milestone -- the end of the 2010 fiscal year and the last day to obligation contract and grant funding under the Recovery Act. For more information about the Recovery Act at the Department of Energy: http://www.energy.gov/recovery Follow the Department of Energy! http://facebook.com/energygov http://twitter.com/energy

  18. Making a Lasting Impression: Recovery Act Reporting At Hanford - 12528

    SciTech Connect

    Tebrugge, Kimberly; Disney, Maren

    2012-07-01

    The award of American Recovery and Reinvestment Act funding came with an unprecedented request for transparency to showcase to the American public how the stimulus funding was being put to work to achieve the goals put forth by the U.S. Government. At the U.S. Department of Energy Hanford Site, this request manifested in a contract requirement to provide weekly narrative, photos and video to highlight Recovery Act-funded projects. For DOE contractor CH2M HILL Plateau Remediation Company (CH2M HILL), the largest recipient of Hanford's funding, the reporting mechanism evolved into a communications tool for documenting the highly technical cleanup, then effectively sharing that story with the DOE and its varying stakeholder audiences. The report set the groundwork for building a streaming narrative of week-by-week progress. With the end of the Recovery Act, CH2M HILL is applying lessons learned from this stringent, transparent reporting process to its long-term reporting and communications of the progress being made in nuclear decommissioning at Hanford. (authors)

  19. 78 FR 48866 - Nationwide Categorical Waivers Under the American Recovery and Reinvestment Act of 2009 (Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-12

    ... 1605 of the Recovery Act under the authority of Section 1605(b)(2), (iron, steel, and the relevant... American provision) if the iron, steel, or relevant manufactured good is not produced or manufactured in... the existing pump's manufacturer. The components are a cast iron N- technology, self-cleaning ]...

  20. 75 FR 58387 - Federal Acquisition Regulation; Information Collection; American Recovery and Reinvestment Act...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... Regulation; Information Collection; American Recovery and Reinvestment Act-Reporting Requirements--One-Time... an extension of a currently approved information collection requirement concerning the American Recovery and Reinvestment Act-Reporting Requirements--One Time- Reporting, Compensation...

  1. 75 FR 58388 - Federal Acquisition Regulation; Information Collection; American Recovery and Reinvestment Act...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... Regulation; Information Collection; American Recovery and Reinvestment Act-Reporting Requirements--Quarterly... an extension of a currently approved information collection requirement concerning the American Recovery and Reinvestment Act--Quarterly Reporting for Prime Contractors. Public comments are...

  2. 77 FR 23764 - Comment Request for Information Collection for Site Visit Data Collection; American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ... Collection; American Recovery and Reinvestment Act (ARRA)-Funded Grants; Job Training Evaluations; Extension... Growth and Emerging Industries Training grant initiative. POP, ETP and SESP are all Green Jobs training... jobs as a strategy for reducing poverty or increasing employment. Conducting these...

  3. 40 CFR 30.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Resource Conservation and Recovery Act... Conservation and Recovery Act (RCRA). Resource Conservation and Recovery Act (RCRA) (Public Law 94-580 codified... materials identified in guidelines developed by EPA (40 CFR parts 247 through 254). Accordingly, State...

  4. 32 CFR 32.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 1 2012-07-01 2012-07-01 false Resource Conservation and Recovery Act (RCRA... Resource Conservation and Recovery Act (RCRA). Recipients' procurements shall comply with applicable requirements of the Resource Conservation and Recovery Act (RCRA), as described at § 32.49....

  5. 40 CFR 40.145-1 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Resource Conservation and Recovery Act... FEDERAL ASSISTANCE RESEARCH AND DEMONSTRATION GRANTS § 40.145-1 Resource Conservation and Recovery Act... Conservation and Recovery Act, shall be the subject of public participation consistent with part 249 of...

  6. 40 CFR 40.145-1 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Resource Conservation and Recovery Act... FEDERAL ASSISTANCE RESEARCH AND DEMONSTRATION GRANTS § 40.145-1 Resource Conservation and Recovery Act... Conservation and Recovery Act, shall be the subject of public participation consistent with part 249 of...

  7. 40 CFR 40.145-1 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Resource Conservation and Recovery Act... FEDERAL ASSISTANCE RESEARCH AND DEMONSTRATION GRANTS § 40.145-1 Resource Conservation and Recovery Act... Conservation and Recovery Act, shall be the subject of public participation consistent with part 249 of...

  8. 32 CFR 32.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 1 2014-07-01 2014-07-01 false Resource Conservation and Recovery Act (RCRA... Resource Conservation and Recovery Act (RCRA). Recipients' procurements shall comply with applicable requirements of the Resource Conservation and Recovery Act (RCRA), as described at § 32.49....

  9. 40 CFR 30.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Resource Conservation and Recovery Act... Conservation and Recovery Act (RCRA). Resource Conservation and Recovery Act (RCRA) (Public Law 94-580 codified... materials identified in guidelines developed by EPA (40 CFR parts 247 through 254). Accordingly, State...

  10. 40 CFR 30.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Resource Conservation and Recovery Act... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Pre-Award Requirements § 30.16 Resource Conservation and Recovery Act (RCRA). Resource Conservation and Recovery Act (RCRA) (Public Law 94-580...

  11. 40 CFR 30.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Resource Conservation and Recovery Act... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Pre-Award Requirements § 30.16 Resource Conservation and Recovery Act (RCRA). Resource Conservation and Recovery Act (RCRA) (Public Law 94-580...

  12. 32 CFR 32.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 1 2013-07-01 2013-07-01 false Resource Conservation and Recovery Act (RCRA... Resource Conservation and Recovery Act (RCRA). Recipients' procurements shall comply with applicable requirements of the Resource Conservation and Recovery Act (RCRA), as described at § 32.49....

  13. 32 CFR 32.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false Resource Conservation and Recovery Act (RCRA... Resource Conservation and Recovery Act (RCRA). Recipients' procurements shall comply with applicable requirements of the Resource Conservation and Recovery Act (RCRA), as described at § 32.49....

  14. 32 CFR 32.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Resource Conservation and Recovery Act (RCRA... Resource Conservation and Recovery Act (RCRA). Recipients' procurements shall comply with applicable requirements of the Resource Conservation and Recovery Act (RCRA), as described at § 32.49....

  15. 75 FR 16498 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ... section 1605(c) of the Recovery Act and OMB's implementing guidance published on April 23, 2009 (74 FR... URBAN DEVELOPMENT Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009... notice advises that certain exceptions to the Buy American requirement of the Recovery Act have...

  16. 40 CFR 30.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Conservation and Recovery Act (RCRA). Resource Conservation and Recovery Act (RCRA) (Public Law 94-580 codified... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Resource Conservation and Recovery Act... materials identified in guidelines developed by EPA (40 CFR parts 247 through 254). Accordingly, State...

  17. The mixture rule under the Resource Conservation and Recovery Act

    SciTech Connect

    Not Available

    1991-09-01

    Under the Resource Conservation and Recovery Act (RCRA), wastes may be classified as hazardous wastes or solid (non-hazardous) wastes. Each classification of wastes has its own applicable handling requirements. In accordance with the definition of hazardous waste under RCRA, waste mixtures containing a hazardous and solid waste component are hazardous wastes, unless certain exceptions apply. The primary purpose of the RCRA waste mixture provisions are to ensure that the Subtitle C (hazardous waste) requirements are applied consistently to both hazardous wastes and waste mixtures. These provisions were intended to discourage the commingling of the hazardous wastes with non-hazardous solid wastes simply to avoid Subtitle C regulation.

  18. More Than 1,000 Fuel Cell Units Deployed Through DOE ARRA Funding (Fact Sheet)

    SciTech Connect

    Not Available

    2012-07-01

    This NREL Hydrogen and Fuel Cell Technical Highlight describes how early market end users are operating 1,111 fuel cell units at 301 sites in 20 states with funding from the U.S. Department of Energy Fuel Cell Technologies Program and analysis by NREL. The American Recovery and Reinvestment Act (ARRA) funded the deployment of approximately 1,000 fuel cell systems in key early markets to accelerate the commercialization and deployment of fuel cells and fuel cell manufacturing, installation, maintenance, and support services. In support of the ARRA fuel cell deployment objectives, NREL analyzes and validates the technology in real-world applications, reports on the technology status, and facilitates the development of fuel cell technologies, manufacturing, and operations in strategic markets-including material handling equipment, backup power, and stationary power-where fuel cells can compete with conventional technologies. NREL is validating hydrogen and fuel cell systems in real-world settings through data collection, analysis, and reporting. The fuel cell and infrastructure analysis provides an independent, third-party assessment that focuses on fuel cell system and hydrogen infrastructure performance, operation, maintenance, use, and safety. An objective of the ARRA fuel cell project-to deploy approximately 1,000 fuel cell systems in key early markets - has been met in two years. By the end of 2011, 504 material handling equipment (MHE) fuel cell units were operating at 8 facilities and 607 backup power fuel cell units were operating at 293 sites. MHE and backup power are two markets where fuel cells are capable of meeting the operating demands, and deployments can be leveraged to accelerate fuel cell commercialization.

  19. DOE FY 2010 Budget Request and Recovery Act Funding for Energy Research, Development, Demonstration, and Deployment: Analysis and Recommendations

    SciTech Connect

    Anadon, Laura Diaz; Gallagher, Kelly Sims; Bunn, Matthew

    2009-06-01

    The combination of the FY 2010 budget request for the Department of Energy (DOE) and the portion of the American Recovery and Reinvestment Act of 2009 (ARRA) funds likely to be available in 2010 would (assuming that they would be split evenly between FY 2010 and FY 2011) result in a doubling in funding available for energy research, development, and deployment (ERD and D) from $3.6 billion in FY 2009 to $7.2 billion in FY 2010. Without the stimulus funds, DOE ERD and D investments in FY 2010 would decrease very slightly when compared to FY 2009. Excluding the $7.5 billion for the Advanced Technology Vehicles Manufacturing Loans in FY 2009, the FY 2010 budget request for deployment represents a 33 percent decrease from the FY 2009 levels from $520 million to $350 million. This decrease is largely due to the large amounts of funds appropriated in ARRA for DOE deployment programs, or $23.6 billion, which are three times greater than those appropriated in the FY 2009 budget. These very substantial funding amounts, coupled with the broad range of institutional innovations the administration is putting in place and movement toward putting a price on carbon emissions, will help accelerate innovation for a broad range of energy technologies. DOE's Advanced Research Projects Agency-Energy (ARPA-E) and the Energy Innovation Hubs are important initiatives that could contribute to two weak points of the government's energy innovation effort, namely funding high-risk projects in transformational technologies and in companies that have not traditionally worked with the government and strengthening the integration of basic and applied research in priority areas. Increasing the funding for different types of energy storage research, providing some support for exploring opportunities in coal-to-liquids with carbon capture and storage (CCS) and coal-and-biomass-to-liquids with CCS, and reducing funding for fission RD and D are other actions that Congress could take in the short

  20. Case Study for the ARRA-funded GSHP Demonstration at University at Albany

    SciTech Connect

    Liu, Xiaobing; Malhotra, Mini; Xiong, Zeyu

    2015-03-01

    High initial costs and lack of public awareness of ground-source heat pump (GSHP) technology are the two major barriers preventing rapid deployment of this energy-saving technology in the United States. Under the American Recovery and Reinvestment Act (ARRA), 26 GSHP projects have been competitively selected and carried out to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. This report highlights the findings of a case study of one of the ARRA-funded GSHP demonstration projects—a distributed GSHP system at a new 500-bed apartment-style student residence hall at the University at Albany. This case study is based on the analysis of detailed design documents, measured performance data, published catalog data of heat pump equipment, and actual construction costs. Simulations with a calibrated computer model are performed for both the demonstrated GSHP system and a baseline heating, ventilation, and airconditioning (HVAC) system to determine the energy savings and other related benefits achieved by the GSHP system. The evaluated performance metrics include the energy efficiency of the heat pump equipment and the overall GSHP system, as well as the pumping performance, energy savings, carbon emission reductions, and cost-effectiveness of the demonstrated GSHP system compared with the baseline HVAC system. This case study also identifies opportunities for improving the operational efficiency of the demonstrated GSHP system.

  1. Case study for ARRA-funded ground-source heat pump (GSHP) demonstration at Oakland University

    SciTech Connect

    Im, Piljae; Liu, Xiaobing

    2015-09-01

    High initial costs and lack of public awareness of ground-source heat pump (GSHP) technology are the two major barriers preventing rapid deployment of this energy-saving technology in the United States. Under the American Recovery and Reinvestment Act (ARRA), 26 GSHP projects have been competitively selected and carried out to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. This paper highlights the findings of a case study of one of the ARRA-funded GSHP demonstration projects, a ground-source variable refrigerant flow (GS-VRF) system installed at the Human Health Building at Oakland University in Rochester, Michigan. This case study is based on the analysis of measured performance data, maintenance records, construction costs, and simulations of the energy consumption of conventional central heating, ventilation, and air-conditioning (HVAC) systems providing the same level of space conditioning as the demonstrated GS-VRF system. The evaluated performance metrics include the energy efficiency of the heat pump equipment and the overall GS-VRF system, pumping performance, energy savings, carbon emission reductions, and cost-effectiveness of the GS-VRF system compared with conventional HVAC systems. This case study also identified opportunities for reducing uncertainties in the performance evaluation, improving the operational efficiency, and reducing the installed cost of similar GSHP systems in the future.

  2. Decision Point 1 of Statement of Project Objectives (SOPO)Recovery Act: Development of ITM Oxygen Technology for Integration with Advanced Industrial Systems

    SciTech Connect

    Armstrong, Phillip

    2011-04-11

    Air Products is designing, building, and operating a ceramic membrane fabrication facility (the “CerFab”) to enable production of membrane modules to supply a conceptual 2000 ton per day (TPD) ITM Oxygen facility (the “ITM Oxygen Development Facility”). Air Products is executing this project under the American Recovery and Reinvestment Act (ARRA) with the objective to accelerate the adoption of ITM Oxygen technology to help meet the country’s goals for deploying clean power plants. The objective of this Topical Report is to address the requirements of Decision Point 1, which pertains to the Site Selection for the CerFab. Air Products with subcontractor Ceramatec, Inc., has determined a ceramic membrane module manufacturing process and the building and site requirements of the process consistent with the manufacturing objectives of the ITM Oxygen development program and this ARRA project. Based on cost estimates for new construction and refurbishments of existing sites, Air Products chose to consider only existing buildings rather than new construction. The Salt Lake City, Utah, region was selected as the preferred location for the CerFab to enable Ceramatec, Inc., to support the Phase V project and on-going Phase III development activities. Twenty available properties were screened in this region, from which one property emerged clearly as the most suitable property to house the CerFab. The site meets the requirements of the CerFab in terms of floor space, power and other utilities, and building structural features. The site also meets criteria for ease of obtaining the requirement environmental permits, and is within the project cost allocation for the building site. Moreover, the site formerly housed a manufacturing company that ceased operations in 2010 as a result of the economic recession of 2008-9; the region of the site has experienced more than a doubling of the unemployment rate since 2007. Restarting a manufacturing operation in the same

  3. 78 FR 54648 - Federal Acquisition Regulation; Information Collection; American Recovery and Reinvestment Act...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-05

    ... Regulation; Information Collection; American Recovery and Reinvestment Act--Reporting Requirements--One-Time... identified by Information Collection 9000- 0168, American Recovery and Reinvestment Act--Reporting..., company name (if any), and ``Information Collection 9000-0168, American Recovery and Reinvestment...

  4. 78 FR 54650 - Federal Acquisition Regulation; Information Collection American Recovery and Reinvestment Act...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-05

    ... Regulation; Information Collection American Recovery and Reinvestment Act-Reporting Requirements--One-Time... comments identified by Information Collection 9000- 0167, American Recovery and Reinvestment Act-Reporting.... Instructions: Please submit comments only and cite Information Collection 9000-0167, American Recovery...

  5. 26 CFR 22.0 - Certain elections under the Economic Recovery Tax Act of 1981.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 14 2010-04-01 2010-04-01 false Certain elections under the Economic Recovery... TREASURY (CONTINUED) ESTATE AND GIFT TAXES TEMPORARY ESTATE TAX REGULATIONS UNDER THE ECONOMIC RECOVERY TAX ACT OF 1981 § 22.0 Certain elections under the Economic Recovery Tax Act of 1981. (a) Election...

  6. 26 CFR 22.0 - Certain elections under the Economic Recovery Tax Act of 1981.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 26 Internal Revenue 14 2012-04-01 2012-04-01 false Certain elections under the Economic Recovery Tax Act of 1981. 22.0 Section 22.0 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE... ACT OF 1981 § 22.0 Certain elections under the Economic Recovery Tax Act of 1981. (a) Election...

  7. 26 CFR 22.0 - Certain elections under the Economic Recovery Tax Act of 1981.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 26 Internal Revenue 14 2014-04-01 2013-04-01 true Certain elections under the Economic Recovery Tax Act of 1981. 22.0 Section 22.0 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE... ACT OF 1981 § 22.0 Certain elections under the Economic Recovery Tax Act of 1981. (a) Election...

  8. Science Goals for the ARM Recovery Act Radars

    SciTech Connect

    JH Mather

    2012-05-29

    Science Goals for the ARM Recovery Act Radars. In October 2008, an ARM workshop brought together approximately 30 climate research scientists to discuss the Atmospheric Radiation Measurement (ARM) Climate Research Facility's role in solving outstanding climate science issues. Through this discussion it was noted that one of ARM's primary contributions is to provide detailed information about cloud profiles and their impact on radiative fluxes. This work supports cloud parameterization development and improved understanding of cloud processes necessary for that development. A critical part of this work is measuring microphysical properties (cloud ice and liquid water content, cloud particle sizes, shapes, and distribution). ARM measurements and research have long included an emphasis on obtaining the best possible microphysical parameters with the available instrumentation. At the time of the workshop, this research was reaching the point where additional reduction in uncertainties in these critical parameters required new instrumentation for applications such as specifying radiative heating profiles, measuring vertical velocities, and studying the convective triggering and evolution of three-dimensional (3D) cloud fields. ARM was already operating a subset of the necessary instrumentation to make some progress on these problems; each of the ARM sites included (and still includes) a cloud radar (operating at 35 or 94 GHz), a cloud lidar, and balloon-borne temperature and humidity sensors. However, these measurements were inadequate for determining detailed microphysical properties in most cases. Additional instrumentation needed to improve retrievals of microphysical processes includes radars at two additional frequencies for a total of three at a single site (35 GHz, 94 GHz, and a precipitation radar) and a Doppler lidar. Evolving to a multi-frequency scanning radar is a medium-term goal to bridge our understanding of two-dimensional (2D) retrievals to the 3D cloud

  9. 75 FR 53323 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... the Recovery Act and OMB's implementing guidance published on April 23, 2009 (74 FR 18449), this..., 2009) (Recovery Act), and implementing guidance of the Office of Management and Budget (OMB), this... Variable Refrigerant Variable Refrigerant Volume systems, also known as Variable Refrigerant Flow ]...

  10. 41 CFR 105-72.206 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false Resource Conservation...-72.206 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act (RCRA... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40...

  11. 41 CFR 105-72.206 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Resource Conservation...-72.206 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act (RCRA... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40...

  12. 14 CFR 1260.116 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Resource Conservation and Recovery Act... Requirements § 1260.116 Resource Conservation and Recovery Act (RCRA). Under the RCRA (Pub. L. 94-580 codified... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40...

  13. 41 CFR 105-72.206 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Resource Conservation...-72.206 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act (RCRA... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40...

  14. 14 CFR § 1260.116 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Resource Conservation and Recovery Act... Requirements § 1260.116 Resource Conservation and Recovery Act (RCRA). Under the RCRA (Pub. L. 94-580 codified... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40...

  15. 10 CFR 600.149 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Resource Conservation and Recovery Act (RCRA). 600.149 Section 600.149 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS FINANCIAL ASSISTANCE RULES... Conservation and Recovery Act (RCRA). Recipients' procurements shall comply with applicable requirements...

  16. 40 CFR 40.145-1 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Resource Conservation and Recovery Act... FEDERAL ASSISTANCE RESEARCH AND DEMONSTRATION GRANTS § 40.145-1 Resource Conservation and Recovery Act..., interstate or intermunicipal agency, or to any public authority, agency or institution, under the...

  17. 41 CFR 105-72.206 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Resource Conservation...-72.206 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act...

  18. Weatherization and Intergovernmental Program - The State Energy Program and the American Recovery and Reinvestment Act

    SciTech Connect

    2010-06-01

    To help the nation weather the ongoing economic downturn and meet key energy goals, the State Energy Program (SEP) will invest $3.1 billion from the American Recovery and Reinvestment Act of 2009 (Recovery Act) for additional grants. These grants do not require matching state funds.

  19. 10 CFR 600.149 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Resource Conservation and Recovery Act (RCRA). 600.149... Conservation and Recovery Act (RCRA). Recipients' procurements shall comply with applicable requirements of RCRA, as described at § 600.116 of this subpart. Reports and Records...

  20. 10 CFR 600.149 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Resource Conservation and Recovery Act (RCRA). 600.149... Conservation and Recovery Act (RCRA). Recipients' procurements shall comply with applicable requirements of RCRA, as described at § 600.116 of this subpart. Reports and Records...

  1. 38 CFR 49.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions of... Recovery Act (RCRA). 49.16 Section 49.16 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS... Conservation and Recovery Act (RCRA). Under the RCRA (Pub. L. 94-580, codified at 42 U.S.C. 6962), any...

  2. 38 CFR 49.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions of... Recovery Act (RCRA). 49.16 Section 49.16 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS... Conservation and Recovery Act (RCRA). Under the RCRA (Pub. L. 94-580, codified at 42 U.S.C. 6962), any...

  3. 10 CFR 600.149 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Resource Conservation and Recovery Act (RCRA). 600.149... Conservation and Recovery Act (RCRA). Recipients' procurements shall comply with applicable requirements of RCRA, as described at § 600.116 of this subpart. Reports and Records...

  4. 41 CFR 105-72.206 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Resource Conservation...-72.206 Resource Conservation and Recovery Act. Under the Resource Conservation and Recovery Act...

  5. 40 CFR 40.145-1 - Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Resource Conservation and Recovery Act... FEDERAL ASSISTANCE RESEARCH AND DEMONSTRATION GRANTS § 40.145-1 Resource Conservation and Recovery Act..., interstate or intermunicipal agency, or to any public authority, agency or institution, under the...

  6. 10 CFR 600.149 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Resource Conservation and Recovery Act (RCRA). 600.149 Section 600.149 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS FINANCIAL ASSISTANCE RULES... Conservation and Recovery Act (RCRA). Recipients' procurements shall comply with applicable requirements...

  7. 14 CFR 1260.116 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Resource Conservation and Recovery Act... Requirements § 1260.116 Resource Conservation and Recovery Act (RCRA). Under the RCRA (Pub. L. 94-580...

  8. 75 FR 10301 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... on April 23, 2009 (74 FR 18449), this notice advises the public that, on February 3, 2010, upon... URBAN DEVELOPMENT Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009... notice advises that certain exceptions to the Buy American requirement of the Recovery Act have...

  9. 75 FR 38684 - Federal Acquisition Regulation; FAR Case 2010-008, Recovery Act Subcontract Reporting Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ... (DoD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA... 2009-009 in the Federal Register, (74 FR 14639) as an interim rule amending the FAR to implement section 1512 of the Recovery Act, which requires contractors to report on their use of Recovery Act...

  10. 76 FR 19381 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    ... published on April 23, 2009 (74 FR 18449), this notice advises the public that, on March 17, 2011, the... URBAN DEVELOPMENT Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009... accordance with the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-05, approved February...

  11. 2 CFR 176.210 - Award term-Recovery Act transactions listed in Schedule of Expenditures of Federal Awards and...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) as required by Congress and in accordance with 2 CFR... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false Award term-Recovery Act transactions listed... TERMS FOR ASSISTANCE AGREEMENTS THAT INCLUDE FUNDS UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT...

  12. Reinvesting in America's Youth: Lessons from the 2009 Recovery Act Summer Youth Employment Initiative

    ERIC Educational Resources Information Center

    Bellotti, Jeanne; Rosenberg, Linda; Sattar, Samina; Esposito, Andrea Mraz; Ziegler, Jessica

    2010-01-01

    On February 17, 2009, President Barack Obama signed the American Recovery and Reinvestment Act into law. Passed in response to the 2008 recession, the Act's purpose was to create jobs, pump money into the economy, and encourage spending. Through the Act, states received $1.2 billion in funding for the workforce investment system to provide…

  13. Recovery Act: Advanced Direct Methanol Fuel Cell for Mobile Computing

    SciTech Connect

    Fletcher, James H.; Cox, Philip; Harrington, William J; Campbell, Joseph L

    2013-09-03

    ABSTRACT Project Title: Recovery Act: Advanced Direct Methanol Fuel Cell for Mobile Computing PROJECT OBJECTIVE The objective of the project was to advance portable fuel cell system technology towards the commercial targets of power density, energy density and lifetime. These targets were laid out in the DOE’s R&D roadmap to develop an advanced direct methanol fuel cell power supply that meets commercial entry requirements. Such a power supply will enable mobile computers to operate non-stop, unplugged from the wall power outlet, by using the high energy density of methanol fuel contained in a replaceable fuel cartridge. Specifically this project focused on balance-of-plant component integration and miniaturization, as well as extensive component, subassembly and integrated system durability and validation testing. This design has resulted in a pre-production power supply design and a prototype that meet the rigorous demands of consumer electronic applications. PROJECT TASKS The proposed work plan was designed to meet the project objectives, which corresponded directly with the objectives outlined in the Funding Opportunity Announcement: To engineer the fuel cell balance-of-plant and packaging to meet the needs of consumer electronic systems, specifically at power levels required for mobile computing. UNF used existing balance-of-plant component technologies developed under its current US Army CERDEC project, as well as a previous DOE project completed by PolyFuel, to further refine them to both miniaturize and integrate their functionality to increase the system power density and energy density. Benefits of UNF’s novel passive water recycling MEA (membrane electrode assembly) and the simplified system architecture it enabled formed the foundation of the design approach. The package design was hardened to address orientation independence, shock, vibration, and environmental requirements. Fuel cartridge and fuel subsystems were improved to ensure effective fuel

  14. 2 CFR 176.50 - Award term-Reporting and registration requirements under section 1512 of the Recovery Act.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... responsible for ensuring that their recipients report information required under the Recovery Act in a timely... report on use of Recovery Act funds provided through this award. Information from these reports will be... awards funded with Recovery Act funds. A Dun and Bradstreet Data Universal Numbering System (DUNS)...

  15. 2 CFR 176.50 - Award term-Reporting and registration requirements under section 1512 of the Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... responsible for ensuring that their recipients report information required under the Recovery Act in a timely... report on use of Recovery Act funds provided through this award. Information from these reports will be... awards funded with Recovery Act funds. A Dun and Bradstreet Data Universal Numbering System (DUNS)...

  16. 2 CFR 176.50 - Award term-Reporting and registration requirements under section 1512 of the Recovery Act.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... Agencies are responsible for ensuring that their recipients report information required under the Recovery... Act) and to report on use of Recovery Act funds provided through this award. Information from these... requirements under section 1512 of the Recovery Act. 176.50 Section 176.50 Grants and Agreements OFFICE...

  17. 2 CFR 176.210 - Award term-Recovery Act transactions listed in Schedule of Expenditures of Federal Awards and...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009, PUBLIC LAW 111-5 Single Audit Information for.... When a recipient awards Recovery Act funds for an existing program, the information furnished to... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false Award term-Recovery Act transactions...

  18. 2 CFR 176.100 - Timely determination concerning the inapplicability of section 1605 of the Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... inapplicability of section 1605 of the Recovery Act. 176.100 Section 176.100 Grants and Agreements Office of... AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009, PUBLIC LAW 111-5 Buy American Requirement Under Section 1605 of the American Recovery and Reinvestment Act of 2009 § 176.100 Timely determination...

  19. 2 CFR 176.100 - Timely determination concerning the inapplicability of section 1605 of the Recovery Act.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... inapplicability of section 1605 of the Recovery Act. 176.100 Section 176.100 Grants and Agreements Office of... THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009, PUBLIC LAW 111-5 Buy American Requirement Under Section 1605 of the American Recovery and Reinvestment Act of 2009 § 176.100 Timely...

  20. 2 CFR 176.100 - Timely determination concerning the inapplicability of section 1605 of the Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... inapplicability of section 1605 of the Recovery Act. 176.100 Section 176.100 Grants and Agreements Office of... INCLUDE FUNDS UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009, PUBLIC LAW 111-5 Buy American Requirement Under Section 1605 of the American Recovery and Reinvestment Act of 2009 § 176.100...

  1. 2 CFR 176.50 - Award term-Reporting and registration requirements under section 1512 of the Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... requirements under section 1512 of the Recovery Act. 176.50 Section 176.50 Grants and Agreements Office of... AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009, PUBLIC LAW 111-5 Reporting and Registration Requirements Under Section 1512 of the American Recovery and Reinvestment Act of 2009 § 176.50 Award...

  2. 2 CFR 176.50 - Award term-Reporting and registration requirements under section 1512 of the Recovery Act.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... requirements under section 1512 of the Recovery Act. 176.50 Section 176.50 Grants and Agreements Office of... THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009, PUBLIC LAW 111-5 Reporting and Registration Requirements Under Section 1512 of the American Recovery and Reinvestment Act of 2009 § 176.50 Award...

  3. 2 CFR 176.100 - Timely determination concerning the inapplicability of section 1605 of the Recovery Act.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... inapplicability of section 1605 of the Recovery Act. 176.100 Section 176.100 Grants and Agreements Office of... INCLUDE FUNDS UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009, PUBLIC LAW 111-5 Buy American Requirement Under Section 1605 of the American Recovery and Reinvestment Act of 2009 § 176.100...

  4. 75 FR 14612 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    ... section 1605(c) of the Recovery Act and OMB's implementing guidance published on April 23, 2009 (74 FR..., and Air Conditioning (HVAC) renovations at the Mainview Apartments. FOR FURTHER INFORMATION...

  5. 76 FR 66948 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-28

    ... section 1605(c) of the Recovery Act and OMB's implementing guidance published on April 23, 2009 (74 FR... installation of a Variable Refrigerant Volume (VRV) heat pump system and vent limited gas regulators for...

  6. 77 FR 34972 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... the Recovery Act and OMB's implementing guidance published on April 23, 2009 (74 FR 18449), this... Variable Refrigerant Flow (VRF) multi-split air conditioners and heat pumps for the Hubert H. Humphrey...

  7. 75 FR 69453 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-12

    ... the Recovery Act and OMB's implementing guidance published on April 23, 2009 (74 FR 18449), this... and installation of through-the-wall air conditioning units and Ground Fault Circuit Interrupter...

  8. 75 FR 48720 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... section 1605(c) of the Recovery Act and OMB's implementing guidance published on April 23, 2009 (74 FR... (ADA-compliant dishwashers), Ground Fault Circuit Interrupter (GFCI) outlets and an Audio/Video...

  9. 15 CFR 14.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 1 2013-01-01 2013-01-01 false Resource Conservation and Recovery Act...-PROFIT, AND COMMERCIAL ORGANIZATIONS Pre-Award Requirements § 14.16 Resource Conservation and Recovery... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40...

  10. 75 FR 58390 - Federal Acquisition Regulation; Information Collection; American Recovery and Reinvestment Act...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... Regulation; Information Collection; American Recovery and Reinvestment Act-Reporting Requirements--One-Time... extension of a currently approved information collection requirement concerning the American Recovery and... particularly invited on: Whether this collection of information is necessary for the proper performance...

  11. 20 CFR 255.12 - When recovery is contrary to the purpose of the Railroad Retirement Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the Railroad Retirement Act. 255.12 Section 255.12 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD RETIREMENT ACT RECOVERY OF OVERPAYMENTS § 255.12 When recovery is contrary to the purpose of the Railroad Retirement Act. (a) The purpose of the Railroad Retirement Act is to...

  12. 76 FR 17429 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ... accordance with the American Recovery and Reinvestment Act of 2009 (Public Law 111-05, approved February 17... purchase and installation of water closets that comply with the Americans with Disabilities Act (ADA-compliant water closets) at the Orness Plaza Apartments project. FOR FURTHER INFORMATION CONTACT: Donald...

  13. Recovery Act - Refinement of Cross Flow Turbine Airfoils

    SciTech Connect

    McEntee, Jarlath

    2013-08-30

    Ocean Renewable Power Company, LLC (ORPC) is a global leader in hydrokinetic technology and project development. ORPC develops hydrokinetic power systems and eco-conscious projects that harness the power of oceans and rivers to create clean, predictable renewable energy. ORPC’s technology consists of a family of modular hydrokinetic power systems: the TidGen® Power System, for use at shallow to medium-depth tidal sites; the RivGen™ Power System, for use at river and estuary sites; and the OCGen® Power System, presently under development, for use at deep tidal and offshore ocean current sites. These power systems convert kinetic energy in moving water into clean, renewable, grid-compatible electric power. The core technology component for all ORPC power systems is its patented turbine generator unit (TGU). The TGU uses proprietary advanced design cross flow (ADCF) turbines to drive an underwater permanent magnet generator mounted at the TGU’s center. It is a gearless, direct-drive system that has the potential for high reliability, requires no lubricants and releases no toxins that could contaminate the surrounding water. The hydrokinetic industry shows tremendous promise as a means of helping reduce the U.S.’s use of fossil fuels and dependence on foreign oil. To exploit this market opportunity, cross-flow hydrokinetic devices need to advance beyond the pre-commercial state and more systematic data about the structure and function of cross-flow hydrokinetic devices is required. This DOE STTR project, “Recovery Act - Refinement of Cross Flow Turbine Airfoils,” refined the cross-flow turbine design process to improve efficiency and performance and developed turbine manufacturing processes appropriate for volume production. The project proposed (1) to overcome the lack of data by extensively studying the properties of cross flow turbines, a particularly competitive design approach for extracting hydrokinetic energy and (2) to help ORPC mature its pre

  14. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance US General Serices Administration - Project 193, John W. Bricker Federal Building, Columbus, OH

    SciTech Connect

    Arends, J.; Sandusky, William F.

    2010-05-31

    This report documents the findings from an onsite audit of the John W. Bricker Federal building located in Columbus, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would either reduce electrical and gas consumption or increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

  15. American Recovery and Reinvestment Act ( ARRA) FEMP Technical Assistance, U.S. General Services Administration - Project 194 U.S. Custom Cargo Inspection Facility, Detroit, MI

    SciTech Connect

    Arends, J.; Sandusky, William F.

    2010-05-31

    This report documents the findings of an on-site audit of the U.S. Customs Cargo Inspection Facility (CIF) in Detroit, Michigan. The federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy-efficiency opportunities that, once implemented, would reduce electrical and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

  16. Arra: Tas::89 0227::Tas Recovery Act 100g Ftp: An Ultra-High Speed Data Transfer Service Over Next Generation 100 Gigabit Per Second Network

    SciTech Connect

    YU, DANTONG

    2014-03-01

    Data-intensive applications, including high energy and nuclear physics, astrophysics, climate modeling, nano-scale materials science, genomics, and financing, are expected to generate exabytes of data over the coming years, which must be transferred, visualized, and analyzed by geographically distributed teams of users. High-performance network capabilities must be available to these users at the application level in a transparent, virtualized manner. Moreover, the application users must have the capability to move large datasets from local and remote locations across network environments to their home institutions. To solve these challenges, the main goal of our project is to design and evaluate high-performance data transfer software to support various data-intensive applications. First, we have designed a middleware software that provides access to Remote Direct Memory Access (RDMA) functionalities. This middleware integrates network access, memory management and multitasking in its core design. We address a number of issues related to its efficient implementation, for instance, explicit buffer management and memory registration, and parallelization of RDMA operations, which are vital to delivering the benefit of RDMA to the applications. Built on top of this middleware, an implementation and experimental evaluation of the RDMA-based FTP software, RFTP, is described and evaluated. This application has been implemented by our team to exploit the full capabilities of advanced RDMA mechanisms for ultra-high speed bulk data transfer applications on Energy Sciences Network (ESnet). Second, we designed our data transfer software to optimize TCP/IP based data transfer performance such that RFTP can be fully compatible with today’s Internet. Our kernel optimization techniques with Linux system calls sendfile and splice, can reduce data copy cost. In this report, we summarize the technical challenges of our project, the primary software design methods, the major project milestones achieved, as well as the testbed evaluation work and demonstrations during our project life time.

  17. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance - United States Pacific Command (PACOM) Guam, Task 3.3: Building Retuning Training

    SciTech Connect

    Hatley, Darrel D.; Underhill, Ronald M.

    2010-09-30

    Document describes an onsite workshop and building retuning training conducted in Guam in August 2010. Document reports on issues identified during an audit of several buildings and recommendations to save energy throughout the site. During the workshop, it became apparent that as site personnel maintain the facilities at Guam, the following retuning efforts and strategies should be prioritized: (1) Controlling the mechanical systems operational hours and zone temperature set points appeared to present the best opportunities for savings; (2) Zone temperature set points in some buildings are excessively low, especially at night, when the zone temperatures are so cold that they approached the dewpoint; and (3) Manually-set outside air dampers are providing excessive outside air, especially for spaces that are unoccupied. Two of the larger schools, one on the Naval Base and one on Anderson AFB, are in need of a significant recommissioning effort. These facilities are relatively new, with direct digital controls (DDC) but are significantly out of balance. The pressure in one school is extremely negative, which is pulling humid air through the facility each time a door is opened. The draft can be felt several feet down the halls. The pressure in the other school is extremely positive relative to the outside, and you can stand 20-feet outside and still feel cool drafts of air exiting the building. It is recommended that humidity sensors be installed in all new projects and retrofitted into exist facilities. In this humid climate, control of humidity is very important. There are significant periods of time when the mechanical systems in many buildings can be unloaded and dehumidification is not required. The use of CO{sub 2} sensors should also be considered in representative areas. CO{sub 2} sensors determine whether spaces are occupied so that fresh air is only brought into the space when needed. By reducing the amount of outside air brought into the space, the humidity load is also substantially reduced. CO{sub 2} and humidity sensors, combined with outside air sensors, can be used to predict whether conditions are amenable to mold growth and to automatically adjust systems to help prevent mold without using extra energy. The goal of this training is to give the building operators the knowledge needed to make positive changes in the operation of building systems. As class participants apply this knowledge, building systems will run more efficiently, occupant comfort should improve, while saving energy and reducing greenhouse gas emissions.

  18. American Recovery and Reinvestment Act (ARRA) - FEMP Technical Assistance - Federal Aviation Administration - Project 209 - Control Tower and Support Building, Boise, Idaho

    SciTech Connect

    Arends, J.; Sandusky, William F.

    2010-06-28

    This report documents an energy audit performed by Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted on the Federal Aviation Administration (FAA) control tower and base building in Boise, Idaho. This report presents findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) followed by a site visit of the facility under construction. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for FAA that would not have otherwise occurred.

  19. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration – Project 209 Control Tower and Support Building, Reno, Nevada

    SciTech Connect

    Arends, J.; Sandusky, William F.

    2010-06-30

    Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted an energy audit on the Federal Aviation Administration (FAA) control tower and base building in Reno, Nevada. This report presents the findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) and completed a site visit. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for the FAA that would not have otherwise occurred.

  20. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration – Project 209 Control Tower and Support Building Oakland, CA

    SciTech Connect

    Arends, J.; Sandusky, William F.

    2010-03-01

    This report represents findings of a design review team that evaluated construction documents (at the 70% level) and operating specifications for a new control tower and support building that will be build at Oakland, California by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specification that would result in additional energy savings for the FAA that would not have otherwise occurred.

  1. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration Project 209 - Control Tower and Support Building, Las Vegas, NV

    SciTech Connect

    Arends, J.; Sandusky, William F.

    2010-03-31

    This report represents findings of a design review team that evaluated construction documents (at the 70% level) and operating specifications for a new control tower and support building that will be built in Las Vegas, Nevada by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specification that would result in additional energy savings for the FAA that would not have otherwise occurred.

  2. By the numbers: how is recovery defined by the U.S. Endangered Species Act?

    USGS Publications Warehouse

    Neel, Maile C.; Leidner, Allison K.; Haines, Aaron; Goble, Dale D.; Scott, J. Michael

    2012-01-01

    Nearly 40 years after passage of the US Endangered Species Act, the prospects for listed species remain dim because they are too severely imperiled by the time they receive the act's protection. Even if threats are abated, the low abundances required for recovery often preclude a high probability of persistence. The lack of sufficient data for setting recovery objectives also remains a barrier. Delisting is considered possible for only 74% of the 1173 species with recovery plans—92% of threatened and 69% of endangered species. The median number of populations required for delisting (8) was at or below the historical numbers for 64% and at or below the numbers at listing for 37% of the species. The median number of individuals required for recovery (2400) exceeded the abundances at listing for 93% of the species, but most were below the levels considered necessary for long-term persistence, especially in changing environments.

  3. 77 FR 518 - Notice of Lodging of the Consent Decree Under the Resource Conservation and Recovery Act and the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-05

    ... of Lodging of the Consent Decree Under the Resource Conservation and Recovery Act and the Clean Water... Conservation and Recovery Act (``RCRA'') violations stemming from its failure to meet cathodic protection... resolves Erie's Clean Water Act (``CWA'') violations stemming from its failure to prepare and...

  4. 78 FR 68093 - Notice of Lodging of Consent Decree; Pursuant to the Resource Conservation and Recovery Act and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-13

    ... of Lodging of Consent Decree; Pursuant to the Resource Conservation and Recovery Act and the Clean Water Act On October 28, 2013, the Department of Justice lodged a proposed Consent Decree (``Decree... Waste et seq. (Section 3005 of the Resource Conservation and Recovery Act (``RCRA''), 42 U.S.C....

  5. 76 FR 16438 - Reallocation of American Recovery and Reinvestment Act Capital Funds-Capital Fund Grant Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... Grant Program Under the American Recovery and Reinvestment Act of 2009 AGENCY: Office of the Assistant... Reinvestment Act of 2009 (the Recovery Act) included a $4 billion appropriation of Capital Funds for public... competitive process. HUD obligated approximately $2.985 million in formula funds to PHAs on March 18, 2009....

  6. 2 CFR 176.190 - Award term-Wage rate requirements under Section 1606 of the Recovery Act.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... THAT INCLUDE FUNDS UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009, PUBLIC LAW 111-5 Wage Rate... rate requirements under Section 1606 of the Recovery Act. When issuing announcements or requesting... Copeland Act, 40 U.S.C. 3145, the Department of Labor has issued regulations at 29 CFR parts 1, 3, and 5...

  7. Special Report "The American Recovery and Reinvestment Act and the Department of Energy"

    SciTech Connect

    2009-03-01

    The American Recovery and Reinvestment Act of 2009 (Recovery Act) was signed into law on February 17, 2009, as a way to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in science and health, and invest in the Nation's energy future. This national effort will require an unprecedented level of transparency and accountability to ensure that U.S. citizens know where their tax dollars are going and how they are being spent. As part of the Recovery Act, the Department of Energy will receive more than $38 billion to support a number of science, energy, and environmental initiatives. Additionally, the Department's authority to make or guarantee energy-related loans has increased to about $127 billion. The Department plans to disburse the vast majority of the funds it receives through grants, cooperative agreements, contracts, and other financial instruments. The supplemental funding provided to the Department of Energy under the Recovery Act dwarfs the Department's annual budget of about $27 billion. The infusion of these funds and the corresponding increase in effort required to ensure that they are properly controlled and disbursed in a timely manner will, without doubt, strain existing resources. It will also have an equally challenging impact on the inherent risks associated with operating the Department's sizable portfolio of missions and activities and, this is complicated by the fact that, in many respects, the Recovery Act requirements represent a fundamental transformation of the Department's mission. If these challenges are to be met successfully, all levels of the Department's structure and its many constituents, including the existing contractor community; the national laboratory system; state and local governments; community action groups and literally thousands of other contract, grant, loan and cooperative agreement recipients throughout the Nation will have to strengthen existing or design new controls to safeguard

  8. Recovery Act - Sustainable Transportation: Advanced Electric Drive Vehicle Education Program

    SciTech Connect

    Caille, Gary

    2013-12-13

    The collective goals of this effort include: 1) reach all facets of this society with education regarding electric vehicles (EV) and plug–in hybrid electric vehicles (PHEV), 2) prepare a workforce to service these advanced vehicles, 3) create web–based learning at an unparalleled level, 4) educate secondary school students to prepare for their future and 5) train the next generation of professional engineers regarding electric vehicles. The Team provided an integrated approach combining secondary schools, community colleges, four–year colleges and community outreach to provide a consistent message (Figure 1). Colorado State University Ventures (CSUV), as the prime contractor, plays a key program management and co–ordination role. CSUV is an affiliate of Colorado State University (CSU) and is a separate 501(c)(3) company. The Team consists of CSUV acting as the prime contractor subcontracted to Arapahoe Community College (ACC), CSU, Motion Reality Inc. (MRI), Georgia Institute of Technology (Georgia Tech) and Ricardo. Collaborators are Douglas County Educational Foundation/School District and Gooru (www.goorulearning.org), a nonprofit web–based learning resource and Google spin–off.

  9. Recovery Act: Head Start Grantees Expand Services, but More Consistent Communication Could Improve Accountability and Decisions about Spending. Report to the Congress. GAO-11-166

    ERIC Educational Resources Information Center

    Ashby, Cornelia M.; Jones, Yvonne D.

    2010-01-01

    This report responds to two mandates for GAO under the American Recovery and Reinvestment Act of 2009 (Recovery Act). First, it is the latest report on the uses of and accountability for Recovery Act funds in selected states and localities. Second, it comments on recipients' reports of the jobs created and retained. The Recovery Act provided $2.1…

  10. Recovery Act. Advanced Load Identification and Management for Buildings

    SciTech Connect

    Yang, Yi; Casey, Patrick; Du, Liang; He, Dawei

    2014-02-12

    In response to the U.S. Department of Energy (DoE)’s goal of achieving market ready, net-zero energy residential and commercial buildings by 2020 and 2025, Eaton partnered with the Department of Energy’s National Renewable Energy Laboratory (NREL) and Georgia Institute of Technology to develop an intelligent load identification and management technology enabled by a novel “smart power strip” to provide critical intelligence and information to improve the capability and functionality of building load analysis and building power management systems. Buildings account for 41% of the energy consumption in the United States, significantly more than either transportation or industrial. Within the building sector, plug loads account for a significant portion of energy consumption. Plug load consumes 15-20% of building energy on average. As building managers implement aggressive energy conservation measures, the proportion of plug load energy can increase to as much as 50% of building energy leaving plug loads as the largest remaining single source of energy consumption. This project focused on addressing plug-in load control and management to further improve building energy efficiency accomplished through effective load identification. The execution of the project falls into the following three major aspects; An intelligent load modeling, identification and prediction technology was developed to automatically determine the type, energy consumption, power quality, operation status and performance status of plug-in loads, using electric waveforms at a power outlet level. This project demonstrated the effectiveness of the developed technology through a large set of plug-in loads measurements and testing; A novel “Smart Power Strip (SPS) / Receptacle” prototype was developed to act as a vehicle to demonstrate the feasibility of load identification technology as a low-cost, embedded solution; and Market environment for plug-in load control and management solutions

  11. Audit Report on "The Department of Energy's American Recovery and Reinvestment Act -- Florida State Energy Program"

    SciTech Connect

    2010-06-01

    The Department of Energy's Office of Energy Efficiency and Renewable Energy (EERE) provides grants to states, territories, and the District of Columbia to support their energy priorities through the State Energy Program (SEP). The SEP provides Federal financial assistance to carry out energy efficiency and renewable energy projects that meet each state's unique energy needs while also addressing national goals such as energy security. Federal funding is based on a grant formula that takes into account population and energy consumption. The SEP emphasizes the state's role as the decision maker and administrator for the program. The American Recovery and Reinvestment Act of 2009 (Recovery Act) expanded the SEP, authorizing $3.1 billion in grants. Based on existing grant formulas and after reviewing state-level plans, EERE made awards to states. The State of Florida's Energy Office (Florida) was allocated $126 million - a 90-fold increase over Florida's average annual SEP grant of $1.4 million. Per the Recovery Act, this funding must be obligated by September 30, 2010, and spent by April 30, 2012. As of March 10, 2010, Florida had expended $13.2 million of the SEP Recovery Act funds. Florida planned to use its grant funds to undertake activities that would preserve and create jobs; save energy; increase renewable energy sources; and, reduce greenhouse gas emissions. To accomplish Recovery Act objectives, states could either fund new or expand existing projects. As a condition of the awards, EERE required states to develop and implement sound internal controls over the use of Recovery Act funds. Based on the significant increase in funding from the Recovery Act, we initiated this review to determine whether Florida had internal controls in place to provide assurance that the goals of the SEP and Recovery Act will be met and accomplished efficiently and effectively. We identified weaknesses in the implementation of SEP Recovery Act projects that have adversely impacted

  12. Geography and recovery under the U.S. Endangered Species Act.

    PubMed

    Carroll, Carlos; Vucetich, John A; Nelson, Michael P; Rohlf, Daniel J; Phillips, Michael K

    2010-04-01

    The U.S. Endangered Species Act (ESA) defines an endangered species as one "at risk of extinction throughout all or a significant portion of its range." The prevailing interpretation of this phrase, which focuses exclusively on the overall viability of listed species without regard to their geographic distribution, has led to development of listing and recovery criteria with fundamental conceptual, legal, and practical shortcomings. The ESA's concept of endangerment is broader than the biological concept of extinction risk in that the "esthetic, ecological, educational, historical, recreational, and scientific" values provided by species are not necessarily furthered by a species mere existence, but rather by a species presence across much of its former range. The concept of "significant portion of range" thus implies an additional geographic component to recovery that may enhance viability, but also offers independent benefits that Congress intended the act to achieve. Although the ESA differs from other major endangered-species protection laws because it acknowledges the distinct contribution of geography to recovery, it resembles the "representation, resiliency, and redundancy" conservation-planning framework commonly referenced in recovery plans. To address representation, listing and recovery standards should consider not only what proportion of its former range a species inhabits, but the types of habitats a species occupies and the ecological role it plays there. Recovery planning for formerly widely distributed species (e.g., the gray wolf [Canis lupus]) exemplifies how the geographic component implicit in the ESA's definition of endangerment should be considered in determining recovery goals through identification of ecologically significant types or niche variation within the extent of listed species, subspecies, or "distinct population segments." By linking listing and recovery standards to niche and ecosystem concepts, the concept of ecologically

  13. 38 CFR 49.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Resource Conservation and... Conservation and Recovery Act (RCRA). Under the RCRA (Pub. L. 94-580, codified at 42 U.S.C. 6962), any State... Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions...

  14. 38 CFR 49.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2014-07-01 2014-07-01 false Resource Conservation and... Conservation and Recovery Act (RCRA). Under the RCRA (Pub. L. 94-580, codified at 42 U.S.C. 6962), any State... Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions...

  15. 38 CFR 49.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false Resource Conservation and... Conservation and Recovery Act (RCRA). Under the RCRA (Pub. L. 94-580, codified at 42 U.S.C. 6962), any State... Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions...

  16. 77 FR 4030 - Nationwide Limited Public Interest Waiver Under the American Recovery and Reinvestment Act of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-26

    ... of Energy Efficiency and Renewable Energy Nationwide Limited Public Interest Waiver Under the... Renewable Energy, U.S. Department of Energy (DOE). ACTION: Notice of limited public interest waiver. SUMMARY... requirements of section 1605 of the Recovery Act under the authority of section 1605(b)(1) (amended...

  17. 78 FR 54252 - Information Collection; American Recovery and Reinvestment Act-Reporting Requirements-One Time...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-03

    ... FR 58389, for the number of respondents required to comply with the requirements of FAR subpart 4.15... Register on September 24, 2010, at 75 FR 58389. No public comments were received in prior years that have...; American Recovery and Reinvestment Act-- Reporting Requirements--One Time Reporting Requirements for...

  18. [Resource Conservation and Recovery Act Part B permit application: Volume 6, Revision 3: Engineering Materials

    SciTech Connect

    Not Available

    1993-01-01

    This report is part of revision 3 to the Resource Conservation and Recovery Act part B permit application for the WIPP facility. Engineering drawings and details are included on the following: fire protection sprinkler system and fire water collection system; fault analysis and protective device coordination; primary power distribution, area electrical diagrams; paving details; fencing plan; railroad access plan; and access road plans.

  19. [Resource Conservation and Recovery Act Part B permit application: Volume 6, Revision 3: Engineering Materials

    SciTech Connect

    Not Available

    1993-03-01

    This report is part of revision 3 to the Resource Conservation and Recovery Act part B permit application for the WIPP facility. Engineering drawings and details are included on the following: fire protection sprinkler system and fire water collection system; fault analysis and protective device coordination; primary power distribution, area electrical diagrams; paving details; fencing plan; railroad access plan; and access road plans.

  20. 77 FR 49006 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-15

    ... section 1605(c) of the Recovery Act and OMB's implementing guidance published on April 23, 2009 (74 FR... H. Humphrey Hi-Rise project. FOR FURTHER INFORMATION CONTACT: Donald J. LaVoy, Deputy Assistant... its Hubert H. ] Humphrey Hi-Rise project. The exception was granted by HUD on the basis that...

  1. 28 CFR 0.69c - Litigation involving the Resource Conservation and Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 1 2013-07-01 2013-07-01 false Litigation involving the Resource Conservation and Recovery Act. 0.69c Section 0.69c Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE Environment and Natural Resources Division § 0.69c Litigation...

  2. 3 CFR - Assignment of Reporting Function Under the American Recovery and Reinvestment Act of 2009

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... by the Constitution and the laws of the United States, including section 301 of title 3, United... 3 The President 1 2010-01-01 2010-01-01 false Assignment of Reporting Function Under the American... 15, 2009 Assignment of Reporting Function Under the American Recovery and Reinvestment Act......

  3. 75 FR 18835 - Submission for OMB Review; American Recovery and Reinvestment Act-One-Time Reporting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ... requirement concerning the one-time reporting, compensation requirements. A request for public comments was published in the Federal Register at 74 FR 14639, on March 31, 2009. Public comments are particularly...; American Recovery and Reinvestment Act--One-Time Reporting, Compensation Requirements AGENCY: Department...

  4. 77 FR 29680 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... funds appropriated or made available by the Recovery Act may be used for a project for the construction, alteration, maintenance, or repair of a public building or public work unless all of the iron, steel, and... interest; (2) iron, steel, and the relevant manufactured goods are not produced in the U.S. in...

  5. 75 FR 45148 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ... section 1605(c) of the Recovery Act and OMB's implementing guidance published on April 23, 2009 (74 FR... Air Conditioning (HVAC) systems at the Mary Bethune High Rise, and to the King County Housing... (tankless water heaters and mini-split ductless HVAC systems) are not produced in the U.S. in sufficient...

  6. 75 FR 61163 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-04

    ... the Recovery Act and OMB's implementing guidance published on April 23, 2009 (74 FR 18449), this... HVAC) system for the Paquin Tower project. FOR FURTHER INFORMATION CONTACT: Dominique G. Blom, Deputy... that the relevant manufactured goods (a VRV HVAC system) is not produced in the U.S. in sufficient...

  7. 14 CFR 1260.116 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Resource Conservation and Recovery Act (RCRA). 1260.116 Section 1260.116 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION... Agreements With Institutions of Higher Education, Hospitals, and Other Non-Profit Organizations...

  8. 14 CFR 1260.116 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Resource Conservation and Recovery Act (RCRA). 1260.116 Section 1260.116 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION GRANTS... With Institutions of Higher Education, Hospitals, and Other Non-Profit Organizations...

  9. 48 CFR 52.204-11 - American Recovery and Reinvestment Act-Reporting Requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Contractor shall report the following information, using the online reporting tool available at http://www... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false American Recovery and Reinvestment Act-Reporting Requirements. 52.204-11 Section 52.204-11 Federal Acquisition Regulations...

  10. 48 CFR 52.204-11 - American Recovery and Reinvestment Act-Reporting Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Contractor shall report the following information, using the online reporting tool available at http://www... 48 Federal Acquisition Regulations System 2 2013-10-01 2013-10-01 false American Recovery and Reinvestment Act-Reporting Requirements. 52.204-11 Section 52.204-11 Federal Acquisition Regulations...

  11. 48 CFR 52.204-11 - American Recovery and Reinvestment Act-Reporting Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Contractor shall report the following information, using the online reporting tool available at http://www... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false American Recovery and Reinvestment Act-Reporting Requirements. 52.204-11 Section 52.204-11 Federal Acquisition Regulations...

  12. 75 FR 55342 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-10

    ... the Recovery Act and OMB's implementing guidance published on April 23, 2009 (74 FR 18449), this... ceiling fans at several of its properties. FOR FURTHER INFORMATION CONTACT: Dominique G. Blom, Deputy... thermostats, CFL bulbs, and ENERGY STAR-qualified ceiling fans) are not produced in the U.S. in sufficient...

  13. 75 FR 63501 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... section 1605(c) of the Recovery Act and OMB's implementing guidance published on April 23, 2009 (74 FR... energy efficient bathroom exhaust fans and linoleum flooring for the Fairmont Street, Valentine Street... exhaust fans and linoleum flooring) are not produced in the U.S. in sufficient and reasonably...

  14. 75 FR 1401 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... tank-less water heaters in the Mineral Springs Village and Boulevard Town Homes. FOR FURTHER... Recovery Act and OMB's implementing guidance published on April 23, 2009 (74 FR 18449), this notice advises... that the relevant manufactured goods (tank-less water heaters) are not produced in the U.S....

  15. 48 CFR 25.602-1 - Section 1605 of the Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-Construction Materials 25.602-1 Section 1605 of the Recovery Act. Except as provided in 25.603— (a) None of the... goods used as construction material in the project are produced or manufactured in the United States. (i) All manufactured construction material must be manufactured in the United States. (ii) Iron or...

  16. 48 CFR 25.602-1 - Section 1605 of the Recovery Act.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Statute-Construction Materials 25.602-1 Section 1605 of the Recovery Act. Except as provided in 25.603— (a..., and manufactured goods used as construction material in the project are produced or manufactured in the United States. (i) All manufactured construction material must be manufactured in the...

  17. 48 CFR 25.602-1 - Section 1605 of the Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-Construction Materials 25.602-1 Section 1605 of the Recovery Act. Except as provided in 25.603— (a) None of the... goods used as construction material in the project are produced or manufactured in the United States. (i) All manufactured construction material must be manufactured in the United States. (ii) Iron or...

  18. 48 CFR 25.602-1 - Section 1605 of the Recovery Act.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-Construction Materials 25.602-1 Section 1605 of the Recovery Act. Except as provided in 25.603— (a) None of the... goods used as construction material in the project are produced or manufactured in the United States. (i) All manufactured construction material must be manufactured in the United States. (ii) Iron or...

  19. Weatherization Works II - Summary of Findings from the ARRA Period Evaluation of the U.S. Department of Energy's Weatherization Assistance Program

    SciTech Connect

    Tonn, Bruce Edward; Carroll, David; Rose, Erin M.; Hawkins, Beth A.; Pigg, Scott; Dalhoff, Greg; Blasnik, Michael; Eisenberg, Joel Fred; Cowan, Claire; Conlon, Brian

    2015-10-01

    This report presents a summary of the American Recovery and Reinvestment Act of 2009 (ARRA) evaluation of the U.S. Department of Energy s low-income Weatherization Program. This evaluation focused on the WAP Program Year 2010. The ARRA evaluation produced fourteen separate reports, including this summary. Three separate reports address the energy savings, energy cost savings, and cost effectiveness of WAP across four housing types: single family, mobile home, and large multifamily. Other reports address the environmental emissions benefits attributable to WAP, and characterize the program. Special studies were conducted to: estimate the impacts of weatherization and healthy homes interventions on asthma-related Medicaid claims in a small cohort in Washington State; assess how weatherization recipients communicate their weatherization experiences to those in their social network, and assess processes implemented to defer homes for weatherization. Small studies addressed energy use in refrigerators, WAP as implemented in the U.S. territories for the first time, and weatherization s impacts on air conditioning energy savings. The national occupant survey was mined for additional insights on the impacts of weatherization on household budgets and energy behaviors post-weatherization. Lastly, the results of a survey of weatherization training centers are summarized.

  20. Recovery Act Education Programs: Funding Retained Teachers, but Education Could More Consistently Communicate Stabilization Monitoring Issues. Report to Congress. GAO-11-804

    ERIC Educational Resources Information Center

    Scott, George A.

    2011-01-01

    The American Recovery and Reinvestment Act of 2009 (Recovery Act) provided $70.3 billion for three education programs--the State Fiscal Stabilization Fund (SFSF); Title I, Part A of the Elementary and Secondary Education Act (Title I); and Individuals with Disabilities Education Act (IDEA), Part B. One goal of the Recovery Act was to save and…

  1. 20 CFR 340.8 - Recovery by adjustment in connection with subsequent payments under the Railroad Retirement Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Recovery by adjustment in connection with subsequent payments under the Railroad Retirement Act. 340.8 Section 340.8 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD UNEMPLOYMENT INSURANCE ACT RECOVERY OF BENEFITS §...

  2. 76 FR 42138 - Notice of Lodging of Consent Decree Under The Resource Conservation and Recovery Act (RCRA)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-18

    ... of Lodging of Consent Decree Under The Resource Conservation and Recovery Act (RCRA) In accordance... Conservation and Recovery Act (``RCRA'') Section 3008(a), 42 U.S.C. 6928(a), and the federal regulations... RCRA Section 3004(d), 42 U.S.C. 6924(d), and Fla. Stat. Chapter 403 ] (Environmental Control), Part...

  3. 2 CFR 176.190 - Award term-Wage rate requirements under Section 1606 of the Recovery Act.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... FUNDS UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009, PUBLIC LAW 111-5 Wage Rate Requirements Under Section 1606 of the American Recovery and Reinvestment Act of 2009 § 176.190 Award term—Wage rate....S.C. 3145, the Department of Labor has issued regulations at 29 CFR parts 1, 3, and 5 to...

  4. 2 CFR 176.190 - Award term-Wage rate requirements under Section 1606 of the Recovery Act.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... FUNDS UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009, PUBLIC LAW 111-5 Wage Rate Requirements Under Section 1606 of the American Recovery and Reinvestment Act of 2009 § 176.190 Award term—Wage rate....S.C. 3145, the Department of Labor has issued regulations at 29 CFR parts 1, 3, and 5 to...

  5. 2 CFR 176.190 - Award term-Wage rate requirements under Section 1606 of the Recovery Act.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... RECOVERY AND REINVESTMENT ACT OF 2009, PUBLIC LAW 111-5 Wage Rate Requirements Under Section 1606 of the American Recovery and Reinvestment Act of 2009 § 176.190 Award term—Wage rate requirements under Section.... 3145, the Department of Labor has issued regulations at 29 CFR parts 1, 3, and 5 to implement the...

  6. 2 CFR 176.210 - Award term-Recovery Act transactions listed in Schedule of Expenditures of Federal Awards and...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Congress and in accordance with 2 CFR 215.21 “Uniform Administrative Requirements for Grants and Agreements... 2 Grants and Agreements 1 2012-01-01 2012-01-01 false Award term-Recovery Act transactions listed... RECOVERY AND REINVESTMENT ACT OF 2009, PUBLIC LAW 111-5 Single Audit Information for Recipients of...

  7. ARRA Brings Home Mixed Report Card

    ERIC Educational Resources Information Center

    McNeil, Michele

    2011-01-01

    Two years after Congress made the federal government's largest one-time investment in the nation's public schools, the American Recovery and Reinvestment Act--the economic-stimulus package--has prevented massive teacher layoffs, spurred states to devise sweeping education overhaul plans, and invigorated the national conversation about turning…

  8. 20 CFR 340.8 - Recovery by adjustment in connection with subsequent payments under the Railroad Retirement Act.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... reflects the annuity rate after actuarial adjustment. Example: An individual agrees to recovery of a $5,000... 20 Employees' Benefits 1 2014-04-01 2012-04-01 true Recovery by adjustment in connection with... RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD UNEMPLOYMENT INSURANCE ACT RECOVERY OF BENEFITS §...

  9. 20 CFR 340.8 - Recovery by adjustment in connection with subsequent payments under the Railroad Retirement Act.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... reflects the annuity rate after actuarial adjustment. Example: An individual agrees to recovery of a $5,000... 20 Employees' Benefits 1 2012-04-01 2012-04-01 false Recovery by adjustment in connection with... RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD UNEMPLOYMENT INSURANCE ACT RECOVERY OF BENEFITS §...

  10. 20 CFR 340.8 - Recovery by adjustment in connection with subsequent payments under the Railroad Retirement Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... reflects the annuity rate after actuarial adjustment. Example: An individual agrees to recovery of a $5,000... 20 Employees' Benefits 1 2011-04-01 2011-04-01 false Recovery by adjustment in connection with... RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD UNEMPLOYMENT INSURANCE ACT RECOVERY OF BENEFITS §...

  11. 20 CFR 340.8 - Recovery by adjustment in connection with subsequent payments under the Railroad Retirement Act.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... reflects the annuity rate after actuarial adjustment. Example: An individual agrees to recovery of a $5,000... 20 Employees' Benefits 1 2013-04-01 2012-04-01 true Recovery by adjustment in connection with... RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD UNEMPLOYMENT INSURANCE ACT RECOVERY OF BENEFITS §...

  12. 26 CFR 301.9100-4T - Time and manner of making certain elections under the Economic Recovery Tax Act of 1981.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... under the Economic Recovery Tax Act of 1981. 301.9100-4T Section 301.9100-4T Internal Revenue INTERNAL... elections under the Economic Recovery Tax Act of 1981. (a) Miscellaneous elections—(1) Elections to which... Recovery Tax Act of 1981: Section of Act Section of code Description of election Availability of...

  13. 26 CFR 301.9100-4T - Time and manner of making certain elections under the Economic Recovery Tax Act of 1981.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... under the Economic Recovery Tax Act of 1981. 301.9100-4T Section 301.9100-4T Internal Revenue INTERNAL... elections under the Economic Recovery Tax Act of 1981. (a) Miscellaneous elections—(1) Elections to which... Recovery Tax Act of 1981: Section of Act Section of code Description of election Availability of...

  14. 26 CFR 301.9100-4T - Time and manner of making certain elections under the Economic Recovery Tax Act of 1981.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... under the Economic Recovery Tax Act of 1981. 301.9100-4T Section 301.9100-4T Internal Revenue INTERNAL... elections under the Economic Recovery Tax Act of 1981. (a) Miscellaneous elections—(1) Elections to which... Recovery Tax Act of 1981: Section of Act Section of code Description of election Availability of...

  15. 26 CFR 301.9100-4T - Time and manner of making certain elections under the Economic Recovery Tax Act of 1981.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... under the Economic Recovery Tax Act of 1981. 301.9100-4T Section 301.9100-4T Internal Revenue INTERNAL... elections under the Economic Recovery Tax Act of 1981. (a) Miscellaneous elections—(1) Elections to which... Recovery Tax Act of 1981: Section of Act Section of code Description of election Availability of...

  16. National Weatherization Assistance Program Characterization - Describing the Pre-ARRA Progam

    SciTech Connect

    Bensch, Ingo; Keene, Ashleigh; Cowan, Claire; Koski, Karen

    2014-09-01

    This report characterizes the Department of Energy s Weatherization Assistance Program (WAP) as it was administered in Program Year 2008. WAP has supported energy efficiency improvements to the homes of low-income households in the United States since 1976. The program provides grants, guidance, and other support to grantees: weatherization programs administered by each of the 50 states, the District of Columbia and some Native American tribes. Although there have been studies of some grantee-administered weatherization programs, the overall effectiveness of the national weatherization program has not been formally evaluated since Program Year 1989. Since that time, the program has evolved significantly, with an increased focus on baseload electric usage, continued evolution of diagnostic tools, new guidelines and best practices for heating-related measures, and adjustments in program rules. More recently, the program has also adjusted to large, temporary funding increases and changes in federal rules spurred by the American Recovery and Reinvestment Act (ARRA). Because the Weatherization Assistance Program of today is dramatically different from the one evaluated in 1989, DOE determined to undertake a new comprehensive evaluation of the national program. This new national evaluation is managed by Oak Ridge National Laboratory (ORNL). Under a competitive solicitation process, ORNL selected APPRISE, Inc., Blasnik & Associates, Dalhoff Associates and the Energy Center of Wisconsin to conduct the evaluation. The national evaluation comprises two independent evaluations. The first evaluation of which this report is a part focuses on Program Year 2008 (PY08). The second evaluation focuses on the ARRA-funded years of 2009 through 2011. This report, together with its companion the Eligible Population Study addresses specific program characterization goals established for the greater evaluation. The Energy Center led grantee and subgrantee data collection efforts

  17. Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication, Environmental Protection Agency Number ID4890008952

    SciTech Connect

    Holzemer, Michael J.; Hart, Edward

    2015-04-01

    Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication for the Idaho National Laboratory Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Partial Permit, PER-116. This Permit Reapplication is required by the PER-116 Permit Conditions I.G. and I.H., and must be submitted to the Idaho Department of Environmental Quality in accordance with IDAPA 58.01.05.012 [40 CFR §§ 270.10 and 270.13 through 270.29].

  18. Recovery Act: ArcelorMittal USA Blast Furnace Gas Flare Capture

    SciTech Connect

    Seaman, John

    2013-01-14

    The U.S. Department of Energy (DOE) awarded a financial assistance grant under the American Recovery and Reinvestment Act of 2009 (Recovery Act) to ArcelorMittal USA, Inc. (ArcelorMittal) for a project to construct and operate a blast furnace gas recovery boiler and supporting infrastructure at ArcelorMittal’s Indiana Harbor Steel Mill in East Chicago, Indiana. Blast furnace gas (BFG) is a by-product of blast furnaces that is generated when iron ore is reduced with coke to create metallic iron. BFG has a very low heating value, about 1/10th the heating value of natural gas. BFG is commonly used as a boiler fuel; however, before installation of the gas recovery boiler, ArcelorMittal flared 22 percent of the blast furnace gas produced at the No. 7 Blast Furnace at Indiana Harbor. The project uses the previously flared BFG to power a new high efficiency boiler which produces 350,000 pounds of steam per hour. The steam produced is used to drive existing turbines to generate electricity and for other requirements at the facility. The goals of the project included job creation and preservation, reduced energy consumption, reduced energy costs, environmental improvement, and sustainability.

  19. The Use of the Hanford Onsite Packaging and Transportation Safety Program to Meet Cleanup Milestones Under the Hanford Site Cleanup 2015 Vision and the American Recovery and Reinvestment Act of 2009 - 12403

    SciTech Connect

    Lavender, John C.; Edwards, W. Scott; Macbeth, Paul J.; Self, Richard J.; West, Lori D.

    2012-07-01

    The Hanford Site presents unique challenges in meeting the U.S. Department of Energy Richland Operations Office (DOE-RL) 2015 Cleanup Vision. CH2M Hill Plateau Remediation Company (CHPRC), its subcontractors, and DOE-RL were challenged to retrieve, transport and remediate a wide range of waste materials. Through a collaborative effort by all Hanford Onsite Central Plateau Cleanup Team Members, disposition pathways for diverse and seemingly impossible to ship wastes were developed under a DOE Order 460.1C-compliant Hanford Onsite Transportation Safety Program. The team determined an effective method for transporting oversized compliant waste payloads to processing and disposition facilities. The use of the onsite TSD packaging authorizations proved to be vital to safely transporting these materials for processing and eventual final disposition. The American Recovery and Reinvestment Act of 2009 (ARRA) provided additional resources to expedite planning and execution of these important cleanup milestones. Through the innovative and creative use of the TSD, the Hanford Onsite Central Plateau Cleanup Team Members have developed and are executing an integrated project plan that enables the safe and compliant transport of a wide variety of difficult-to-transport waste items, accelerating previous cleanup schedules to meet cleanup milestones. (authors)

  20. Recovery of imperiled species under the Endangered Species Act: The need for a new approach

    USGS Publications Warehouse

    Scott, J.M.; Goble, D.D.; Wiens, J.A.; Wilcove, D.S.; Bean, M.; Male, T.

    2005-01-01

    The recovery (delisting) of a threatened or endangered species is often accompanied by the expectation that conservation management of the species will no longer be necessary. However, the magnitude and pace of human impacts on the environment make it unlikely that substantial progress will be made in delisting many species unless the definition of "recovery" includes some form of active management. Preventing delisted species from again being at risk of extinction may require continuing, species-specific management actions. We characterize such species as "conservation-reliant", and suggest that viewing "recovery" as a continuum of states rather than as a simple "recovered/not recovered" dichotomy may enhance our ability to manage such species within the framework of the Endangered Species Act. With ongoing loss of habitat, disruption of natural disturbance regimes, and the increasing impacts of non-native invasive species, it is probable that the number of conservation-reliant species will increase. We propose the development of "recovery management agreements", with legally and biologically defensible contracts that would provide for continu-ing conservation management following delisting. The use of such formalized agreements will facilitate shared management responsibilities between federal wildlife agencies and other federal agencies, and with state, local, and tribal governments, as well as with private entities that have demonstrated the capability to meet the needs of conservation-reliant species. ?? The Ecological Society of America.

  1. Recovery Act Weekly Video: 200 Area Asbestos Removal, U-Ancillary Demolition, 200 West Transfer Building Footings

    SciTech Connect

    2010-01-01

    A weekly update of the Recovery Act at work. Demolition of U-Ancillary that was contaminated with uranium and asbestos as well as removing asbestos from the Steam Generation Plant in the 200 East Area.

  2. Recovery Act Weekly Video: 200 Area Asbestos Removal, U-Ancillary Demolition, 200 West Transfer Building Footings

    ScienceCinema

    None

    2016-07-12

    A weekly update of the Recovery Act at work. Demolition of U-Ancillary that was contaminated with uranium and asbestos as well as removing asbestos from the Steam Generation Plant in the 200 East Area.

  3. American Recovery and Reinvestment Act: North Fork Skokomish Powerhouse at Cushman No. 2 Dam

    SciTech Connect

    Fischer, Steve; McCarty, Patrick

    2013-09-30

    The objective of this project was to add generating capacity on an in-stream flow release at Tacoma Power's Cushman hydroelectric project, Cushman No. 2 Dam, FERC Project P-460. The flow that is being used to generate additional electricity was being discharged from a valve at the base of the dam without recovery of the energy. A second objective to the project was to incorporate upstream fish passage by use of a fish collection structure attached to the draft tubes of the hydroelectric units. This will enable reintroduction of native anadromous fish above the dams which have blocked fish passage since the late 1920's. The project was funded in part by the American Recovery and Reinvestment Act through the Department of Energy, Office of Energy, Efficiency and Renewable Energy, Wind and Water Power Program.

  4. Decision Point 2 of Statement of Project Objectives (SOPO) “Recovery Act: Development of ITM Oxygen Technology for Integration with Advanced Industrial Systems”

    SciTech Connect

    Armstrong, Phillip

    2011-08-01

    Air Products is carrying out a scope of work under Phase 5 of the ITM Oxygen Cooperative Agreement to design, build, and operate a ceramic membrane fabrication facility (the “CerFab”) to enable production of membrane modules to supply a conceptual 2000 ton per day (TPD) ITM Oxygen facility (the “ITM Oxygen Development Facility”), and to perform supporting development tasks in materials development an engineering development toward industrial, carbon capture and sequestration applications. Air Products is executing this project under the American Recovery and Reinvestment Act (ARRA) with the objective to accelerate the adoption of ITM Oxygen technology to help meet the country’s goals for deploying clean power plants. The objective of this Topical Report is to address the requirements of Decision Point 2, which pertains to progress in Materials Development, Engineering Development, and construction of the CerFab, with an emphasis on establishing the environmental permitting required prior to the next Decision Point. In the area of Materials Development, Air Products has specified a high pressure dilatometer system which will enable measurements of material expansion of ITM ceramic compounds at very high oxygen partial pressures consistent with CCS applications. Also in this area, Ceramatec has made significant progress in developing Advanced Architecture wafers and modules by advancing in parallel with two production methods of the Advanced Architecture components and determining the appropriate equipment required to make these components at high volume in the CerFab. Work in this area continues to refine the CerFab requirements. Under Engineering Development, Air Products has developed various concepts around use of ITM in industrial applications to reduce carbon footprint though process integrations that result in less fuel requirement. Air Products also developed notions around hybrid cryogenic air separation plants with ITM Oxygen plants for scale

  5. Tax Act encourages business purchases in 2009.

    PubMed

    Epple, Rick

    2009-01-01

    In talking with dentists, the awareness level of the opportunity provided by the American Recovery and Reinvestment Act seems to be rather low. The Act provides tax breaks for dental practice owners to create jobs by making it attractive to invest in their practices. However, lower taxes should not be what drives the decision making process. First and foremost, the capital improvements need to make sense from a business and return-on-investment standpoint. There is not much time to complete the project(s) in 2009 and to benefit from the tax breaks afforded by the ARRA. Therefore, dentists should consult with their tax advisors as soon as possible to take full advantage of the provisions the Act provides.

  6. Tax Act encourages business purchases in 2009.

    PubMed

    Epple, Rick

    2009-01-01

    In talking with dentists, the awareness level of the opportunity provided by the American Recovery and Reinvestment Act seems to be rather low. The Act provides tax breaks for dental practice owners to create jobs by making it attractive to invest in their practices. However, lower taxes should not be what drives the decision making process. First and foremost, the capital improvements need to make sense from a business and return-on-investment standpoint. There is not much time to complete the project(s) in 2009 and to benefit from the tax breaks afforded by the ARRA. Therefore, dentists should consult with their tax advisors as soon as possible to take full advantage of the provisions the Act provides. PMID:19757644

  7. 2 CFR 176.210 - Award term-Recovery Act transactions listed in Schedule of Expenditures of Federal Awards and...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... accordance with 2 CFR 215.21 “Uniform Administrative Requirements for Grants and Agreements” and OMB Circular... 2 Grants and Agreements 1 2014-01-01 2014-01-01 false Award term-Recovery Act transactions listed... Reserved AWARD TERMS FOR ASSISTANCE AGREEMENTS THAT INCLUDE FUNDS UNDER THE AMERICAN RECOVERY...

  8. Pacing the ARRA changes. Tackling the ARRA rules and regulations as they come.

    PubMed

    Featheringham, Meg

    2010-08-01

    Through the winter and spring healthcare waited for the next round of ARRA-related regulations. Now they are here, and organizations are tagged with implementing compliant programs. How do you get started when it seems that everything needs doing at once?

  9. Social impact evaluation of the US Resource Conservation and Recovery Act

    NASA Astrophysics Data System (ADS)

    Poppitti, James; Dietz, Thomas

    1983-11-01

    Debate over environmental policy often focuses on social impacts of those policies, but few empirical studies examine the impacts of environmental regulations once they are implemented. A quasi-experimental design based on survey data is used to assess the social impacts of the US Resource Conservation and Recovery Act (RCRA) on the West Virginia chemical industry. Changes in employment, manufacturing process, product line, and manufacturing costs are evaluated. RCRA seems to have produced changes in manufacturing processes, but we find no statistically significant impacts on.jobs, product line, or manufacturing costs.

  10. Resource Conservation and Recovery Act (RCRA) closure sumamry for the Uranium Treatment Unit

    SciTech Connect

    1996-05-01

    This closure summary has been prepared for the Uranium Treatment Unit (UTU) located at the Y-12 Plant in Oak Ridge, Tennessee. The actions required to achieve closure of the UTU area are outlined in the Closure Plan, submitted to and approved by the Tennessee Department of Environmental and Conservation staff, respectively. The UTU was used to store and treat waste materials that are regulated by the Resource Conservation and Recovery Act. This closure summary details all steps that were performed to close the UTU in accordance with the approved plan.

  11. Overview of the regulation of hazardous chemicals: SDWA (Safe Drinking Water Act), RCRA (Resource Conservation and Recovery Act), and CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act)

    SciTech Connect

    Baes, C.F. III

    1989-01-01

    The regulation of nonradioactive hazardous chemicals is carried out under a number of federal environmental laws that regulate either hazardous products, substances, or wastes. Because each law is intended to provide protection from different classes of substances (e.g., wastes vs products) or protect different media (e.g., air, water, land), the standards and levels of protection for different hazardous chemicals may be different. Nevertheless, one agency -- the Environmental Protection Agency (EPA) -- has primary responsibility for both promulgating regulations mandated by Congress under the various statutes and enforcement of the regulations. One overriding principal underlies the maze of complex regulations that govern the transport, treatment, storage, and disposal of hazardous substances: protect human health and the environment. It is beyond the scope of this talk to comprehensively examine all of the regulations and standards that govern the management of hazardous chemicals. Instead this discussion will focus on three statutes, the Safe Drinking Water Act (SDWA), the Resource Conservation and Recovery Act (RCRA), and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), that together provide a basis for a basic understanding of the approach that the EPA takes to regulating hazardous chemicals.

  12. 75 FR 34279 - Federal Acquisition Regulation; FAR Case 2009-011, American Recovery and Reinvestment Act of 2009...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... they believe an IG must provide reasonable advance notice to contractors and their employees before a... processes. 4. IG authority to interview subcontractor employees. Comment: A respondent commented that while... Reinvestment Act of 2009 (Recovery Act)--GAO/IG Access AGENCIES: Department of Defense (DoD), General...

  13. 48 CFR 25.604 - Preaward determination concerning the inapplicability of section 1605 of the Recovery Act or the...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... FOREIGN ACQUISITION American Recovery and Reinvestment Act-Buy American Act-Construction Materials 25.604... identified construction materials. The time for submitting the request is specified in the solicitation in... available information. (c) Determination based on unreasonable cost of domestic construction material....

  14. 48 CFR 25.604 - Preaward determination concerning the inapplicability of section 1605 of the Recovery Act or the...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... FOREIGN ACQUISITION American Recovery and Reinvestment Act-Buy American Act-Construction Materials 25.604... identified construction materials. The time for submitting the request is specified in the solicitation in... available information. (c) Determination based on unreasonable cost of domestic construction material....

  15. 48 CFR 25.604 - Preaward determination concerning the inapplicability of section 1605 of the Recovery Act or the...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... FOREIGN ACQUISITION American Recovery and Reinvestment Act-Buy American Act-Construction Materials 25.604... identified construction materials. The time for submitting the request is specified in the solicitation in... available information. (c) Determination based on unreasonable cost of domestic construction material....

  16. 48 CFR 25.604 - Preaward determination concerning the inapplicability of section 1605 of the Recovery Act or the...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FOREIGN ACQUISITION American Recovery and Reinvestment Act-Buy American Act-Construction Materials 25.604... identified construction materials. The time for submitting the request is specified in the solicitation in... available information. (c) Determination based on unreasonable cost of domestic construction material....

  17. Assessing the impact of the U.S. Endangered Species Act recovery planning guidelines on managing threats for listed species.

    PubMed

    Troyer, Caitlin M; Gerber, Leah R

    2015-10-01

    The Endangered Species Act (ESA) of the United States was enacted in 1973 to prevent the extinction of species. Recovery plans, required by 1988 amendments to the ESA, play an important role in organizing these efforts to protect and recover species. To improve the use of science in the recovery planning process, the Society for Conservation Biology (SCB) commissioned an independent review of endangered species recovery planning in 1999. From these findings, the SCB made key recommendations for how management agencies could improve the recovery planning process, after which the U.S. Fish and Wildlife Service and the National Marine Fisheries Service redrafted their recovery planning guidelines. One important recommendation called for recovery plans to make threats a primary focus, including organizing and prioritizing recovery tasks for threat abatement. We sought to determine the extent to which results from the SCB study were incorporated into these new guidelines and whether the SCB recommendations regarding threats manifested in recovery plans written under the new guidelines. Recovery planning guidelines generally incorporated the SCB recommendations, including those for managing threats. However, although recent recovery plans have improved in their treatment of threats, many fail to adequately incorporate threat monitoring. This failure suggests that developing clear guidelines for monitoring should be an important priority in improving ESA recovery planning.

  18. Assessing the impact of the U.S. Endangered Species Act recovery planning guidelines on managing threats for listed species.

    PubMed

    Troyer, Caitlin M; Gerber, Leah R

    2015-10-01

    The Endangered Species Act (ESA) of the United States was enacted in 1973 to prevent the extinction of species. Recovery plans, required by 1988 amendments to the ESA, play an important role in organizing these efforts to protect and recover species. To improve the use of science in the recovery planning process, the Society for Conservation Biology (SCB) commissioned an independent review of endangered species recovery planning in 1999. From these findings, the SCB made key recommendations for how management agencies could improve the recovery planning process, after which the U.S. Fish and Wildlife Service and the National Marine Fisheries Service redrafted their recovery planning guidelines. One important recommendation called for recovery plans to make threats a primary focus, including organizing and prioritizing recovery tasks for threat abatement. We sought to determine the extent to which results from the SCB study were incorporated into these new guidelines and whether the SCB recommendations regarding threats manifested in recovery plans written under the new guidelines. Recovery planning guidelines generally incorporated the SCB recommendations, including those for managing threats. However, although recent recovery plans have improved in their treatment of threats, many fail to adequately incorporate threat monitoring. This failure suggests that developing clear guidelines for monitoring should be an important priority in improving ESA recovery planning. PMID:26108948

  19. Audit Report on "Management Controls over the Department of Energy's American Recovery and Reinvestment Act - Louisiana State Energy Program"

    SciTech Connect

    2010-05-01

    The Department of Energy's (Department) Office of Energy Efficiency and Renewable Energy (EERE) provides grants to states, territories and the District of Columbia (states) to support their energy priorities through the State Energy Program (SEP). Federal funding is based on a grant formula that considers the population and energy consumption in each state, and amounted to $25 million for Fiscal Year (FY) 2009. The American Recovery and Reinvestment Act of 2009 (Recovery Act) expanded the SEP by authorizing an additional $3.1 billion to states using the existing grant formula. EERE made grant awards to states after reviewing plans that summarize the activities states will undertake to achieve SEP Recovery Act objectives, including preserving and creating jobs; saving energy; increasing renewable energy sources; and, reducing greenhouse gas emissions. EERE program guidance emphasizes that states are responsible for administering SEP within each state, and requires each state to implement internal controls over the use of Recovery Act funds. The State of Louisiana received $71.6 million in SEP Recovery Act funds; a 164-fold increase over its FY 2009 SEP grant of $437,000. As part of the Office of Inspector General's strategy for reviewing the Department's implementation of the Recovery Act, we initiated this review to determine whether the Louisiana State Energy Office had internal controls in place to efficiently and effectively administer Recovery Act funds provided for its SEP program. Louisiana developed a strategy for SEP Recovery Act funding that focused on improving energy efficiency in state buildings, housing and small businesses; increasing Energy Star appliance rebates; and, expanding the use of alternative fuels and renewable energy. Due to a statewide hiring freeze, Louisiana outsourced management of the majority of its projects ($63.3 million) to one general contractor. Louisiana plans to internally manage one project, Education and Outreach ($2

  20. Day-to-day compliance with Resource Conservation Recovery Act (RCRA)

    SciTech Connect

    Harris, W.E.; Hart, J.T.

    1995-12-31

    Day-to-day compliance with requirements of the Resource Conservation Recovery Act (RCRA) is an important, yet difficult, component of environmental compliance. Non-compliance with RCRA can result in substantial financial penalties and/or major costs associated with clean-up of contaminated facilities. This session will include a review of all of the major RCRA, hazardous waste generator requirements and selected TSD requirements. Emphasis will be placed on requirements which regulated industries routinely fail and on which penalties for non- compliance may be levied. Specific procedures and suggestions for assuring continued compliance will be presented. Also included is a review of the RCRA waste characterization requirements and means for assuring compliance. Finally, examples of specific RCRA enforcement actions will be presented along with an explanation of how RCRA penalties are calculated and how RCRA penalties can be mitigated.

  1. Evidence of recovery of Juniperus virginiana trees from sulfur pollution after the Clean Air Act.

    PubMed

    Thomas, Richard B; Spal, Scott E; Smith, Kenneth R; Nippert, Jesse B

    2013-09-17

    Using dendroisotopic techniques, we show the recovery of Juniperus virginiana L. (eastern red cedar) trees in the Central Appalachian Mountains from decades of acidic pollution. Acid deposition over much of the 20th century reduced stomatal conductance of leaves, thereby increasing intrinsic water-use efficiency of the Juniperus trees. These data indicate that the stomata of Juniperus may be more sensitive to acid deposition than to increasing atmospheric CO2. A breakpoint in the 100-y δ(13)C tree ring chronology occurred around 1980, as the legacy of sulfur dioxide emissions declined following the enactment of the Clean Air Act in 1970, indicating a gradual increase in stomatal conductance (despite rising levels of atmospheric CO2) and a concurrent increase in photosynthesis related to decreasing acid deposition and increasing atmospheric CO2. Tree ring δ(34)S shows a synchronous change in the sources of sulfur used at the whole-tree level that indicates a reduced anthropogenic influence. The increase in growth and the δ(13)C and δ(34)S trends in the tree ring chronology of these Juniperus trees provide evidence for a distinct physiological response to changes in atmospheric SO2 emissions since ∼1980 and signify the positive impacts of landmark environmental legislation to facilitate recovery of forest ecosystems from acid deposition.

  2. Evidence of recovery of Juniperus virginiana trees from sulfur pollution after the Clean Air Act.

    PubMed

    Thomas, Richard B; Spal, Scott E; Smith, Kenneth R; Nippert, Jesse B

    2013-09-17

    Using dendroisotopic techniques, we show the recovery of Juniperus virginiana L. (eastern red cedar) trees in the Central Appalachian Mountains from decades of acidic pollution. Acid deposition over much of the 20th century reduced stomatal conductance of leaves, thereby increasing intrinsic water-use efficiency of the Juniperus trees. These data indicate that the stomata of Juniperus may be more sensitive to acid deposition than to increasing atmospheric CO2. A breakpoint in the 100-y δ(13)C tree ring chronology occurred around 1980, as the legacy of sulfur dioxide emissions declined following the enactment of the Clean Air Act in 1970, indicating a gradual increase in stomatal conductance (despite rising levels of atmospheric CO2) and a concurrent increase in photosynthesis related to decreasing acid deposition and increasing atmospheric CO2. Tree ring δ(34)S shows a synchronous change in the sources of sulfur used at the whole-tree level that indicates a reduced anthropogenic influence. The increase in growth and the δ(13)C and δ(34)S trends in the tree ring chronology of these Juniperus trees provide evidence for a distinct physiological response to changes in atmospheric SO2 emissions since ∼1980 and signify the positive impacts of landmark environmental legislation to facilitate recovery of forest ecosystems from acid deposition. PMID:24003125

  3. Data Analysis for ARRA Early Fuel Cell Market Demonstrations (Presentation)

    SciTech Connect

    Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.

    2010-05-01

    Presentation about ARRA Early Fuel Cell Market Demonstrations, including an overview of the ARRE Fuel Cell Project, the National Renewable Energy Laboratory's data analysis objectives, deployment composite data products, and planned analyses.

  4. HANFORD TANK FARM RESOURCE CONVERVATION & RECOVERY ACT (RCRA) CORRECTIVE ACTION PROGRAM

    SciTech Connect

    KRISTOFZSKI, J.G.

    2007-01-15

    As a consequence of producing special nuclear material for the nation's defense, large amounts of extremely hazardous radioactive waste was created at the US Department of Energy's (DOE) Hanford Site in south central Washington State. A little over 50 million gallons of this waste is now stored in 177 large, underground tanks on Hanford's Central Plateau in tank farms regulated under the Atomic Energy Act and the Resource, Conservation, and Recovery Act (RCRA). Over 60 tanks and associated infrastructure have released or are presumed to have released waste in the vadose zone. In 1998, DOE's Office of River Protection established the Hanford Tank Farm RCRA Corrective Action Program (RCAP) to: (1) characterize the distribution and extent of the existing vadose zone contamination; (2) determine how the contamination will move in the future; (3) estimate the impacts of this contamination on groundwater and other media; (4) develop and implement mitigative measures; and (5) develop corrective measures to be implemented as part of the final closure of the tank farm facilities. Since its creation, RCAP has made major advances in each of these areas, which will be discussed in this paper.

  5. Final Scientific/Technical Report [Recovery Act: Districtwide Geothermal Heating Conversion

    SciTech Connect

    Chatterton, Mike

    2014-02-12

    The Recovery Act: Districtwide Geothermal Heating Conversion project performed by the Blaine County School District was part of a larger effort by the District to reduce operating costs, address deferred maintenance items, and to improve the learning environment of the students. This project evaluated three options for the ground source which were Open-Loop Extraction/Re-injection wells, Closed-Loop Vertical Boreholes, and Closed-Loop Horizontal Slinky approaches. In the end the Closed-Loop Horizontal Slinky approach had the lowest total cost of ownership but the majority of the sites associated with this project did not have enough available ground area to install the system so the second lowest option was used (Open-Loop). In addition to the ground source, this project looked at ways to retrofit existing HVAC systems with new high efficiency systems. The end result was the installation of distributed waterto- air heat pumps with water-to-water heat pumps installed to act as boilers/chillers for areas with a high ventilation demand such as they gymnasiums. A number of options were evaluated and the lowest total cost of ownership approach was implemented in the majority of the facilities. The facilities where the lowest total cost of ownership approaches was not selected were done to maintain consistency of the systems from facility to facility. This project had a number of other benefits to the Blaine County public. The project utilizes guaranteed energy savings to justify the levy funds expended. The project also developed an educational dashboard that can be used in the classrooms and to educate the community on the project and its performance. In addition, the majority of the installation work was performed by contractors local to Blaine County which acted as an economic stimulus to the area during a period of recession.

  6. 75 FR 34685 - Notice of Buy American Exception Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... facilities projects using assistance provided under ARRA. This action permits the use of non-domestic iron... building or public work unless all of the iron, steel, and manufactured goods used in the project are... Buy American provision would be inconsistent with the public interest; (2) the iron, steel,...

  7. 2 CFR 176.210 - Award term-Recovery Act transactions listed in Schedule of Expenditures of Federal Awards and...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Congress and in accordance with 2 CFR 215.21 “Uniform Administrative Requirements for Grants and Agreements... inclusion of the prefix “ARRA-” in identifying the name of the Federal program on the SEFA and as the...

  8. 75 FR 34271 - Federal Acquisition Regulation; FAR Case 2009-010, American Recovery and Reinvestment Act of 2009...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... National Aeronautics and Space Administration (NASA). ACTION: Final rule. SUMMARY: The Civilian Agency... Federal Register at 74 FR 14636 on March 31, 2009, with a request for comments by June 1, 2009. The... of ARRA funding should be awarded to American Indians, which comprise the largest percentage of...

  9. State, District, and School Implementation of Reforms Promoted under the Recovery Act: 2009-10 through 2011-12. The Final Report from Charting the Progress of Education Reform: An Evaluation of the Recovery Act's Role. NCEE 2015-4016

    ERIC Educational Resources Information Center

    Troppe, Patricia; Milanowski, Anthony; Garrison-Mogren, Roberta; Webber, Ann; Gutmann, Babette; Reisner, Elizabeth; Goertz, Margaret

    2015-01-01

    This report, based on surveys completed by all 50 State Education Agencies (SEAs) and the District of Columbia (DC) and nationally representative samples of districts and schools during spring 2011 and 2012, examines implementation of the key education reform strategies promoted by the Recovery Act in 2011-12, the extent to which implementation…

  10. Recovery Act: SeaMicro Volume Server Power Reduction Research Development

    SciTech Connect

    Gary Lauterbach

    2012-03-22

    Cloud data centers are projected to be the fastest growing segment of the server market through 2015, according to IDC. Increasingly people and businesses rely on the Cloud to deliver digital content quickly and efficiently. Recovery Act funding from the Department of Energy has helped SeaMicro's technologies enhance the total cost of operation, performance and energy efficiency in large data center and Cloud environments. SeaMicro's innovative supercomputer fabric connects thousands of processor cores, memory, storage and input/output traffic. The company's fabric supports multiple processor instruction sets. Current systems featuring SeaMicro technology typically use one quarter the power and take one sixth the space of traditional servers with the same compute performance, yet deliver up to 12 times the bandwidth per core. Mozilla and eHarmony are two customers successfully using SeaMicro's technology. Numerous non-public customers have been successfully using the SeaMicro product in test and production facilities. As a result of the Recovery Act funding from the U.S. Department of Energy, more than 50 direct jobs were created at SeaMicro. To date, they primarily have been high-value, engineering jobs. Hardware, software and manufacturing engineering positions have been created, as well as sales and sales engineering. The positions have allowed SeaMicro to significantly accelerate engineering development and accelerate commercialization. As a result, commercialization and delivery to market are months ahead of initial schedule. Additional jobs were indirectly created through the development of the SeaMicro product. Through many years of research and hard work prior to receipt of public funding, SeaMicro was awarded 2 patents for its work. SeaMicro's product led the way for industry leaders to reconsider the market for low power servers and create new product lines. With valuable support of the U.S. Department of Energy and through SeaMicro's product, the market

  11. 75 FR 41239 - Notice of Lodging of Consent Decree; Pursuant to the Resource Conservation and Recovery Act (“RCRA”)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-15

    ... Bus Authority of Puerto Rico's (``MBA'') violations of the Resource Conservation and Recovery Act... Agreement and Final Order (``CA/FO'') entered into between MBA and the United States Environmental Protection Agency (``US EPA'') on July 8, 2007. The United States asserted claims for MBA's failure to...

  12. 76 FR 35919 - Notice of Buy American Waiver Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    .... 115, 303 (2009), with respect to the purchase of the Heating Ventilating and Air Conditioning (HVAC... provide added humidity for the HVAC system. DATES: June 20, 2011. ADDRESSES: National Science Foundation... exemption of section 1605 of the Recovery Act (Buy American provision) with respect to the HVAC system...

  13. 75 FR 37456 - Green Retrofit Program of Title XII of the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Green Retrofit Program of Title XII of the American Recovery and Reinvestment Act of... Lists the Following Information Title of Proposal: Green Retrofit Program of Title XII of the...

  14. 2 CFR 176.190 - Award term-Wage rate requirements under Section 1606 of the Recovery Act.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 2 Grants and Agreements 1 2014-01-01 2014-01-01 false Award term-Wage rate requirements under Section 1606 of the Recovery Act. 176.190 Section 176.190 Grants and Agreements Office of Management and Budget Guidance for Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET GOVERNMENTWIDE GUIDANCE FOR GRANTS AND AGREEMENTS Reserved AWARD TERMS...

  15. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    SciTech Connect

    Not Available

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field-investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans.

  16. Resource Conservation and Recovery Act (RCRA) Closure Plan Summary for Interim reasctive Waste Treatment Area (IRWTA)

    SciTech Connect

    Collins, E.T.

    1997-07-01

    This closure plan has been prepared for the interim Reactive Waste Treatment Area (IRWT'A) located at the Y-12 Pkmt in oak Ridge, Tennessee (Environmental Protection Agency [EPA] Identification TN 389-009-0001). The actions required to achieve closure of the IRWTA are outlined in this plan, which is being submitted in accordance with Tennessee Ruie 1200- 1-1 1-.0S(7) and Title 40, Code of Federal Regulations (CFR), Part 265, Subpart G. The IRWTA was used to treat waste sodium and potassium (NaK) that are regulated by the Resource Conservation and Recovery Act (RCRA). The location of the IRWT'A is shown in Figures 1 and 2, and a diagram is shown in Figure 3. This pkm details all steps that wdi be petiormed to close the IRWTA. Note that this is a fmai ciosure.and a diagram is shown in Figure 3. This pkm details all steps that wdi be petiormed to close the IRWTA. Note that this is a fmai ciosure.

  17. Enforcement actions under the Resource Conservation and Recovery Act. Final report

    SciTech Connect

    Brown, D.M.; Baxter, R.J.

    1994-09-01

    The Army continues to receive enforcement actions (EAS) that detract from its image as a conscientious adherent to environmental laws. In some cases, receipt of violations may indicate the persistent presence of systemic problems. In the past 2 years, the Army has been investigating its EAs to determine whether some problems are more prevalent than others and what can be done to resolve them. This report addresses EAs issued to the Army pursuant to the Resource Conservation and Recovery Act (RCRA) and similar state laws and their implementing regulations. RCRA is similar to other regulatory programs reviewed by the Logistics Management Institute, in that the root causes were in procedural and oversight failures. Thus, action taken to address the systemic problems in any of the environmental program areas should relieve compliance problems in all areas. The systemic problems occur in four general areas: maintaining knowledgeable staff; spreading awareness of requirements to operators and supervisors who are not part of the environmental staff; improving oversight of environmentally sensitive operations conducted by both government and contractor personnel; and, once people have the appropriate knowledge, holding them responsible for applying it. We recommend that the Army hold individuals having responsibility for the operation and oversight of environmentally sensitive facilities accountable for proper performance, devise means to make RCRA training more effective, and require certifications and continuing professional development of environmental professionals.

  18. Impact of the resource conservation and recovery act on energy facility siting

    SciTech Connect

    Tevepaugh, C.W.

    1982-01-01

    The Resource Conservation and Recovery Act (RCRA) of 1976 is a multifaceted approach to the management of both solid and hazardous waste. The focus of this research is on the RCRA mandated proposed regulations for the siting of hazardous waste disposal facilities. This research is an analysis of the interactions among hazardous waste disposal facilities, energy supply technologies and land use issues. This study addresses the impact of RCRA hazardous waste regulations in a descriptive and exploratory manner. A literature and legislative review, interviews and letters of inquiry were synthesized to identify the relationship between RCRA hazardous waste regulations and the siting of selected energy supply technologies. The results of this synthesis were used to determine if and how RCRA influences national land use issues. It was found that the interaction between RCRA and the siting of hazardous waste disposal facilities required by energy supply technologies will impact national land use issues. All energy supply technologies reviewed generate hazardous waste. The siting of industrial functions such as energy supply facilities and hazardous waste disposal facilities will influence future development patterns. The micro-level impacts from the siting of hazardous waste disposal facilities will produce a ripple effect on land use with successive buffer zones developing around the facilities due to the interactive growth of the land use sectors.

  19. So much to do, so little time. To accomplish the mandatory initiatives of ARRA, healthcare organizations will require significant and thoughtful planning, prioritization and execution.

    PubMed

    Klein, Kimberly

    2010-01-01

    The American Recovery and Reinvestment Act of 2009 (ARRA) has set forth legislation for the healthcare community to achieve adoption of electronic health records (EHR), as well as form data standards, health information exchanges (HIE) and compliance with more stringent security and privacy controls under the HITECH Act. While the Office of the National Coordinator for Health Information Technology (ONCHIT) works on the definition of both "meaningful use" and "certification" of information technology systems, providers in particular must move forward with their IT initiatives to achieve the basic requirements for Medicare and Medicaid incentives starting in 2011, and avoid penalties that will reduce reimbursement beginning in 2015. In addition, providers, payors, government and non-government stakeholders will all have to balance the implementation of EHRs, working with HIEs, at the same time that they must upgrade their systems to be in compliance with ICD-10 and HIPAA 5010 code sets. Compliance deadlines for EHRs and HIEs begin in 2011, while ICD-10 diagnosis and procedure code sets compliance is required by October 2013 and HIPAA 5010 transaction sets, with one exception, is required by January 1, 2012. In order to accomplish these strategic and mandatory initiatives successfully and simultaneously, healthcare organizations will require significant and thoughtful planning, prioritization and execution. PMID:20077923

  20. So much to do, so little time. To accomplish the mandatory initiatives of ARRA, healthcare organizations will require significant and thoughtful planning, prioritization and execution.

    PubMed

    Klein, Kimberly

    2010-01-01

    The American Recovery and Reinvestment Act of 2009 (ARRA) has set forth legislation for the healthcare community to achieve adoption of electronic health records (EHR), as well as form data standards, health information exchanges (HIE) and compliance with more stringent security and privacy controls under the HITECH Act. While the Office of the National Coordinator for Health Information Technology (ONCHIT) works on the definition of both "meaningful use" and "certification" of information technology systems, providers in particular must move forward with their IT initiatives to achieve the basic requirements for Medicare and Medicaid incentives starting in 2011, and avoid penalties that will reduce reimbursement beginning in 2015. In addition, providers, payors, government and non-government stakeholders will all have to balance the implementation of EHRs, working with HIEs, at the same time that they must upgrade their systems to be in compliance with ICD-10 and HIPAA 5010 code sets. Compliance deadlines for EHRs and HIEs begin in 2011, while ICD-10 diagnosis and procedure code sets compliance is required by October 2013 and HIPAA 5010 transaction sets, with one exception, is required by January 1, 2012. In order to accomplish these strategic and mandatory initiatives successfully and simultaneously, healthcare organizations will require significant and thoughtful planning, prioritization and execution.

  1. Decision Point 3 of Statement of Project Objectives (SOPO) “Recovery Act: Development of ITM Oxygen Technology for Integration with Advanced Industrial Systems”

    SciTech Connect

    Armstrong, Phillip

    2012-03-01

    Air Products is carrying out a scope of work under Phase 5 of the ITM Oxygen Cooperative Agreement to design, build, and operate a ceramic membrane fabrication facility (the -CerFabII) to enable production of membrane modules to supply a conceptual 2000 ton per day (TPD) ITM Oxygen facility (the -ITM Oxygen Development FacilityII), and to perform supporting development tasks in materials development and engineering development toward industrial, carbon capture and sequestration applications. Air Products is executing this project under the American Recovery and Reinvestment Act (ARRA) with the objective to accelerate the adoption of ITM Oxygen technology to help meet the country’s goals for deploying clean power plants. The objective of this Topical Report is to address the requirements of Decision Point 3 (DP3), which pertains to the status of all Tasks within Phase 5 and most notably the project status of the CerFab (Task 30) prior to authorization of funds for equipment purchase and construction of the facility. The intent of the DP3 is to provide the opportunity for DOE-NETL to review the status of these tasks and to make recommendations on forward project direction, including a recommendation to pass into Budget Period 8. In the area of Materials Development, Air Products has specified a high pressure dilatometer system which will enable measurements of material expansion of ITM ceramic compounds at very high oxygen partial pressures consistent with CCS applications. Under Task 28.2, subcontractor Ceramatec has made significant progress since DP2 in materials selection and process development and improvement for advanced architecture module fabrication. Ceramatec has determined a materials specification, and has selected a process for making the material. Ceramatec has further developed and selected the process for applying the membrane to unsintered advanced architecture wafers with a Two Step process. Ceramatec has built submodules meeting leak rate

  2. INFORMATION: Special Report on "Selected Department of Energy Program Efforts to Implement the American Recovery and Reinvestment Act"

    SciTech Connect

    2009-12-01

    The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009, to jumpstart the economy by creating or saving millions of jobs, spurring technological advances in health and science, and investing in the Nation's energy future. The Department of Energy received over $32.7 billion in Recovery Act funding for various science, energy, and environmental programs and initiatives. As of November 2009, the Department had obligated $18.3 billion of the Recovery Act funding, but only $1.4 billion had been spent. The Department's Offices of Energy Efficiency and Renewable Energy, Fossil Energy, Environmental Management, Science, and Electricity Delivery and Energy Reliability received the majority of funding allocated to the Department, about $32.3 billion. Obligating these funds by the end of Fiscal Year 2010, as required by the Recovery Act, and overseeing their effective use in succeeding years, represents a massive workload increase for the Department's programs. The effort to date has strained existing resources. As has been widely acknowledged, any effort to disburse massive additional funding and to expeditiously initiate and complete projects increases the risk of fraud, waste and abuse. It is, therefore, important for the Department's program offices to assess and mitigate these risks to the maximum extent practicable. In this light, we initiated this review as an initial step in the Office of Inspector General's charge to determine whether the Department's major program offices had developed an effective approach for identifying and mitigating risks related to achieving the goals and objectives of the Recovery Act. The Department's program offices included in our review identified risks and planned mitigation strategies that, if successfully implemented and executed, should help achieve the goals and objectives of the Recovery Act. While each office identified risks unique to its respective areas of responsibility, there were a

  3. 76 FR 1441 - Health Center Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-10

    ... transfer the remaining American Recovery and Reinvestment Act (ARRA) Increased Demand for Services (IDS.... Original Period of Grant Support: ARRA IDS Funds--March 27, 2009 to March 26, 2011; ARRA CIP Funds--June...

  4. Recovery Act: Billions of Dollars in Education Credits Appear to Be Erroneous. Treasury Inspector General for Tax Administration. Reference Number: 2011-41-083

    ERIC Educational Resources Information Center

    US Department of the Treasury, 2011

    2011-01-01

    Education credits are available to help offset the costs of higher education for taxpayers, their spouses, and dependents who qualify as eligible students. The American Recovery and Reinvestment Act of 2009 (Recovery Act) amended the Hope Scholarship Tax Credit (Hope Credit) to provide for a refundable tax credit known as the American Opportunity…

  5. 45 CFR 74.16 - Resource Conservation and Recovery Act (RCRA, Section 6002 of Pub. L. No. 94-580 (Codified at 42...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions of... 45 Public Welfare 1 2010-10-01 2010-10-01 false Resource Conservation and Recovery Act (RCRA... COMMERCIAL ORGANIZATIONS Pre-Award Requirements § 74.16 Resource Conservation and Recovery Act (RCRA,...

  6. 45 CFR 74.16 - Resource Conservation and Recovery Act (RCRA, Section 6002 of Pub. L. No. 94-580 (Codified at 42...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions of... 45 Public Welfare 1 2011-10-01 2011-10-01 false Resource Conservation and Recovery Act (RCRA... COMMERCIAL ORGANIZATIONS Pre-Award Requirements § 74.16 Resource Conservation and Recovery Act (RCRA,...

  7. 45 CFR 74.16 - Resource Conservation and Recovery Act (RCRA, Section 6002 of Pub. L. No. 94-580 (Codified at 42...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions of... 45 Public Welfare 1 2013-10-01 2013-10-01 false Resource Conservation and Recovery Act (RCRA... COMMERCIAL ORGANIZATIONS Pre-Award Requirements § 74.16 Resource Conservation and Recovery Act (RCRA,...

  8. 45 CFR 74.16 - Resource Conservation and Recovery Act (RCRA, Section 6002 of Pub. L. No. 94-580 (Codified at 42...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions of... 45 Public Welfare 1 2012-10-01 2012-10-01 false Resource Conservation and Recovery Act (RCRA... COMMERCIAL ORGANIZATIONS Pre-Award Requirements § 74.16 Resource Conservation and Recovery Act (RCRA,...

  9. 45 CFR 74.16 - Resource Conservation and Recovery Act (RCRA, Section 6002 of Pub. L. No. 94-580 (Codified at 42...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local institutions of... 45 Public Welfare 1 2014-10-01 2014-10-01 false Resource Conservation and Recovery Act (RCRA... COMMERCIAL ORGANIZATIONS Pre-Award Requirements § 74.16 Resource Conservation and Recovery Act (RCRA,...

  10. Solid waste landfills under the Resource Conservation and Recovery Act Subtitle D

    SciTech Connect

    1995-11-01

    This document provides guidance for meeting: (1) Guidelines for the Land Disposal of Solid Waste (40 CFR 241); (2) Criteria for Classification of Solid Waste Disposal Facilities and Practices (40 CFR 257); and (3) Criteria for Municipal Solid Waste Landfills (MSWLFs) (40 CFR Part 258). Revisions to 40 CFR 257 and a new Part 258 were published in the Federal Register (56 FR 50978, 10/9/91). The Guidelines for the Land Disposal of Solid Waste set requirements and recommended procedures to ensure that the design, construction, and operation of land disposal sites is done in a manner that will protect human health and the environment. These regulations are applicable to MSWLFs and non-MSWLFs (e.g., landfills used only for the disposal of demolition debris, commercial waste, and/or industrial waste). These guidelines are not applicable to the, land disposal of hazardous, agricultural, and/or mining wastes. These criteria are to be used under the Resource Conservation and Recovery Act (RCRA) in determining which solid waste disposal facilities pose a reasonable possibility of adversely affecting human health or the environment. Facilities failing to satisfy these criteria will be considered to be open dumps which are prohibited under Section 4005 of RCRA. The Criteria for MSWLFs are applicable only to MSWLFs, including those MSWLFs in which sewage sludge is co-disposed with household waste. Based on specific criteria, certain MSWLFs are exempt from some, or all, of the regulations of 40 CFR 258. MSWLFs that fail to satisfy the criteria specified in 40 CFR 258 are also considered open dumps for the purposes of Section 4005 of RCRA. Through the use of a series of interrelated flow diagrams, this guidance document directs the reader to each design, operation, maintenance, and closure activity that must be performed for MSWLFs and non-MSWLFs.

  11. The dynamics of environmental inspections and enforcement: Pollution prevention and the Resource Conservation and Recovery Act

    SciTech Connect

    Spitzer, M.A.

    1992-01-01

    This fieldwork study examined the role of inspectors in the enforcement of the hazardous waste laws under the Resource Conservation and Recovery Act. Regulatory agencies seek compliance through either a strict deterrence or a cooperative enforcement strategy. The studies assume that compliance is the objective and that policy-makers and the public are interested both in enforcement processes and their success in inducing compliance. The study documents the social milieu of inspectors who determine whether businesses comply with hazardous waste regulations. It also considers whether compliance with regulatory requirements, alone, should be the metric of the program's success, or whether broader objectives should be the measure of success. Data were collected through participant-observation of inspectors in New York State's Department of Environmental Conservation and during two years working for the U.S. Environmental Protection Agency's, Office of Pollution Prevention. The study has several central findings: One is that the RCRA statue and the federal and state agencies that implement it limit inspectors' discretion and centralize enforcement discretion to an extraordinary degree. Second, while inspectors generally follow the formal controls, they also solve a broader array of problems. They supplement their police role with an advisory role. Third, inspectors tailor their strategies depending on their personal experiences. Fourth, inspectors and the remainder of the RCRA enforcement program must more proactively promote solutions beyond compliance. These findings lead to several conclusions: (1) enforcement systems must incorporate the social aspects of enforcement into policy decisions, and (2) enforcement systems and researchers must be concerned with not only enforcement processes, but also the program's ultimate environmental protection goals.

  12. Resource Conservation and Recovery Act permit modifications and the functional equivalency demonstration: a case study

    SciTech Connect

    Elsberry, K.; Garcia, P.; Carnes, R.; Kinker, J.; Loehr, C; Lyon, W.

    1996-02-01

    Hazardous waste operating permits issued under the Resource Conservation and Recovery Act (RCRA) often impose requirements that specific components and equipment be used. Consequently, changing these items, may first require that the owner/operator request a potentially time-consuming and costly permit modification. However, the owner/operator may demonstrate that a modification is not required because the planned changes are ``functionally equivalent.`` The Controlled-Air Incinerator at Los Alamos National Laboratory is scheduled for maintenance and improvements. The incinerator`s carbon adsorption unit/high efficiency particulate air filtration system, was redesigned to improve reliability and minimize maintenance. A study was performed to determine whether the redesigned unit would qualify as functionally equivalent to the original component. In performing this study, the following steps were taken: (a) the key performance factors were identified; (b) performance data describing the existing unit were obtained; (c) performance of both the existing and redesigned units was simulated; and (d) the performance data were compared to ascertain whether the components could qualify as functionally equivalent. In this case, the key performance data included gas residence time and distribution of flow over the activated carbon. Because both units were custom designed and fabricated, a simple comparison of manufacturers` specifications was impossible. Therefore, numerical simulation of each unit design was performed using the TEMPEST thermal-hydraulic computer code to model isothermal hydrodynamic performance under steady-state conditions. The results of residence time calculations from the model were coupled with flow proportion and sampled using a Monte Carlo-style simulation to derive distributions that describe the predicted residence times.

  13. American Recovery and Reinvestment Act-comparative effectiveness research infrastructure investments: emerging data resources, tools and publications.

    PubMed

    Segal, Courtney; Holve, Erin

    2014-11-01

    The Recovery Act provided a substantial, one-time investment in data infrastructure for comparative effectiveness research (CER). A review of the publications, data, and tools developed as a result of this support has informed understanding of the level of effort undertaken by these projects. Structured search queries, as well as outreach efforts, were conducted to identify and review resources from American Recovery and Reinvestment Act of 2009 CER projects building electronic clinical data infrastructure. The findings from this study provide a spectrum of productivity across a range of topics and settings. A total of 451 manuscripts published in 192 journals, and 141 data resources and tools were identified and address gaps in evidence on priority populations, conditions, and the infrastructure needed to support CER.

  14. Recovery

    NASA Video Gallery

    This video discusses the recovery events that occur in high-power rocketry and the various devices used in safely recovering the rocket. The video includes a discussion of black powder and ejection...

  15. Case Study of The ARRA-Funded GSHP Demonstration at the Natural Sources Building, Montana Tech

    SciTech Connect

    Malhotra, Mini; Liu, Xiaobing

    2015-04-01

    Under the American Recovery and Reinvestment Act (ARRA), 26 ground source heat pump (GSHP) projects were competitively selected in 2009 to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. One of the selected demonstration projects was proposed by Montana Tech of the University of Montana for a 56,000 sq ft, newly constructed, on-campus research facility – the Natural Resources Building (NRB) located in Butte, Montana. This demonstrated GSHP system consists of a 50 ton water-to-water heat pump and a closed-loop ground heat exchanger with two redundant 7.5 hp constant-speed pumps to use water in the nearby flooded mines as a heat source or heat sink. It works in conjunction with the originally installed steam HX and an aircooled chiller to provide space heating and cooling. It is coupled with the existing hot water and chilled water piping in the building and operates in the heating or cooling mode based on the outdoor air temperature. The ground loop pumps operate in conjunction with the existing pumps in the building hot and chilled water loops for the operation of the heat pump unit. The goal of this demonstration project is to validate the technical and economic feasibility of the demonstrated commercial-scale GSHP system in the region, and illustrate the feasibility of using mine waters as the heat sink and source for GSHP systems. Should the demonstration prove satisfactory and feasible, it will encourage similar GSHP applications using mine water, thus help save energy and reduce carbon emissions. The actual performance of the system is analyzed with available measured data for January through July 2014. The annual energy performance is predicted and compared with a baseline scenario, with the heating and cooling provided by the originally designed systems. The comparison is made in terms of energy savings, operating cost savings, cost-effectiveness, and environmental benefits. Finally

  16. [Recovery].

    PubMed

    Estingoy, Pierrette; Gilliot, Élodie; Parisot, Clément

    2015-01-01

    The historical fatalism of the impossibility of recovering from psychosis eased from the 1970s with the shaping of the idea of a possible recovery. Recovery is today the objective for the patient and caregivers. The key to achieving this lies in the encounter with Others. A collective approach, on the level of the institution, must be established. The aim is to create opportunities for the patient to express their doubts and feelings. PMID:26363659

  17. Recovery Act: Oxy-Combustion Techology Development for Industrial-Scale Boiler Applications

    SciTech Connect

    Levasseur, Armand

    2014-04-30

    Alstom Power Inc. (Alstom), under U.S. DOE/NETL Cooperative Agreement No. DE-NT0005290, is conducting a development program to generate detailed technical information needed for application of oxy-combustion technology. The program is designed to provide the necessary information and understanding for the next step of large-scale commercial demonstration of oxy combustion in tangentially fired boilers and to accelerate the commercialization of this technology. The main project objectives include: • Design and develop an innovative oxyfuel system for existing tangentially-fired boiler units that minimizes overall capital investment and operating costs. • Evaluate performance of oxyfuel tangentially fired boiler systems in pilot scale tests at Alstom’s 15 MWth tangentially fired Boiler Simulation Facility (BSF). • Address technical gaps for the design of oxyfuel commercial utility boilers by focused testing and improvement of engineering and simulation tools. • Develop the design, performance and costs for a demonstration scale oxyfuel boiler and auxiliary systems. • Develop the design and costs for both industrial and utility commercial scale reference oxyfuel boilers and auxiliary systems that are optimized for overall plant performance and cost. • Define key design considerations and develop general guidelines for application of results to utility and different industrial applications. The project was initiated in October 2008 and the scope extended in 2010 under an ARRA award. The project completion date was April 30, 2014. Central to the project is 15 MWth testing in the BSF, which provided in-depth understanding of oxy-combustion under boiler conditions, detailed data for improvement of design tools, and key information for application to commercial scale oxy-fired boiler design. Eight comprehensive 15 MWth oxy-fired test campaigns were performed with different coals, providing detailed data on combustion, emissions, and thermal behavior over a

  18. Inter- and Intra-method Variability of VS Profiles and VS30 at ARRA-funded Sites

    NASA Astrophysics Data System (ADS)

    Yong, A.; Boatwright, J.; Martin, A. J.

    2015-12-01

    The 2009 American Recovery and Reinvestment Act (ARRA) funded geophysical site characterizations at 191 seismographic stations in California and in the central and eastern United States. Shallow boreholes were considered cost- and environmentally-prohibitive, thus non-invasive methods (passive and active surface- and body-wave techniques) were used at these stations. The drawback, however, is that these techniques measure seismic properties indirectly and introduce more uncertainty than borehole methods. The principal methods applied were Array Microtremor (AM), Multi-channel Analysis of Surface Waves (MASW; Rayleigh and Love waves), Spectral Analysis of Surface Waves (SASW), Refraction Microtremor (ReMi), and P- and S-wave refraction tomography. Depending on the apparent geologic or seismic complexity of the site, field crews applied one or a combination of these methods to estimate the shear-wave velocity (VS) profile and calculate VS30, the time-averaged VS to a depth of 30 meters. We study the inter- and intra-method variability of VS and VS30 at each seismographic station where combinations of techniques were applied. For each site, we find both types of variability in VS30 remain insignificant (5-10% difference) despite substantial variability observed in the VS profiles. We also find that reliable VS profiles are best developed using a combination of techniques, e.g., surface-wave VS profiles correlated against P-wave tomography to constrain variables (Poisson's ratio and density) that are key depth-dependent parameters used in modeling VS profiles. The most reliable results are based on surface- or body-wave profiles correlated against independent observations such as material properties inferred from outcropping geology nearby. For example, mapped geology describes station CI.LJR as a hard rock site (VS30 > 760 m/s). However, decomposed rock outcrops were found nearby and support the estimated VS30 of 303 m/s derived from the MASW (Love wave) profile.

  19. Case Study for the ARRA-funded Ground Source Heat Pump Demonstration at Denver Museum of Nature & Science

    SciTech Connect

    Im, Piljae; Liu, Xiaobing

    2015-11-30

    High initial costs and lack of public awareness of ground-source heat pump (GSHP) technology are the two major barriers preventing rapid deployment of this energy-saving technology in the United States. Under the American Recovery and Reinvestment Act (ARRA), 26 GSHP projects were competitively selected and carried out to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. This report highlights the findings of a case study of one such GSHP demonstration projects that uses a recycled water heat pump (RWHP) system installed at the Denver Museum of Nature & Science in Denver, Colorado. The RWHP system uses recycled water from the city’s water system as the heat sink and source for a modular water-to-water heat pump (WWHP). This case study was conducted based on the available measured performance data from December 2014 through August 2015, utility bills of the building in 2014 and 2015, construction drawings, maintenance records, personal communications, and construction costs. The annual energy consumption of the RWHP system was calculated based on the available measured data and other related information. It was compared with the performance of a baseline scenario— a conventional VAV system using a water-cooled chiller and a natural gas fired boiler, both of which have the minimum energy efficiencies allowed by ASHRAE 90.1-2010. The comparison was made to determine energy savings, operating cost savings, and CO2 emission reductions achieved by the RWHP system. A cost analysis was performed to evaluate the simple payback of the RWHP system. Summarized below are the results of the performance analysis, the learned lessons, and recommended improvement in the operation of the RWHP system.

  20. Recovery Act: States Could Provide More Information on Education Programs to Enhance the Public's Understanding of Fund Use. Report to the Republican Leader, U.S. Senate. GAO-10-807

    ERIC Educational Resources Information Center

    Ashby, Cornelia M.

    2010-01-01

    The American Recovery and Reinvestment Act of 2009 (Recovery Act) provides $70.3 billion for three education programs--the State Fiscal Stabilization Fund (SFSF), Title I of the Elementary and Secondary Education Act (Title I), and Individuals with Disabilities Education Act (IDEA). The Act requires recipients to be accountable for how these funds…

  1. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. General Services Administration – Project 195 John Seiberling Federal Office Building and U.S. Courthouse, Akron, Ohio

    SciTech Connect

    Arends, J.; Sandusky, William F.

    2010-05-28

    This report documents the findings from an onsite audit of the John Seiberling Federal building located in Akron, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would reduce in either electrical and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

  2. Managing Waste Inventory and License Limits at the Perma-Fix Northwest Facility to Meet CH2M Hill Plateau Remediation Company (CHPRC) American Recovery and Reinvestment Act (ARRA) Deliverables - 12335

    SciTech Connect

    Moak, Don J.; Grondin, Richard L.; Triner, Glen C.; West, Lori D.

    2012-07-01

    CH2M Hill Plateau Remediation Company (CHRPC) is a prime contractor to the U.S. Department of Energy (DOE) focused on the largest ongoing environmental remediation project in the world at the DOE Hanford Site Central Plateau, i.e. the DOE Hanford Plateau Remediation Contract. The East Tennessee Materials and Energy Corporation (M and EC); a wholly owned subsidiary of Perma-Fix Environmental Services, Inc. (PESI), is a small business team member to CHPRC. Our scope includes project management; operation and maintenance of on-site storage, repackaging, treatment, and disposal facilities; and on-site waste management including waste receipt from generators and delivery to on-site and off-site treatment, storage, and disposal facilities. As part of this scope, M and EC staffs the centralized Waste Support Services organization responsible for all waste characterization and acceptance required to support CHPRC and waste generators across the Hanford Site. At the time of the CHPRC contract award (August 2008) slightly more than 9,000 cubic meters (m{sup 3}) of legacy waste was defined as 'no-path-forward waste'. A significant portion of this waste (7,650 m{sup 3}) comprised wastes with up to 50 grams of special nuclear materials (SNM) in oversized packages recovered during retrieval operations and large glove boxes removed from the Plutonium Finishing Plant (PFP). Through a collaborative effort between the DOE, CHPRC, and Perma-Fix Environmental Services, Inc. (PESI), pathways for these problematic wastes were developed that took advantage of commercial treatment capabilities at a nearby vendor facility, Perma-Fix Northwest (PFNW). In the spring of 2009, CHPRC initiated a pilot program under which they began shipping large package, low gram suspect TRU (<15 g SNM per container), and large package contact and remote handled MLLW to the off-site PFNW facility for treatment. PFNW is restricted by the SNM limits set for the total quantity of SNM allowed at the facility in accordance with the facility's radioactive materials license(s) (RML). While both CHPRC and PFNW maintain waste databases to track all waste movements, it became evident early in the process that a tool was needed that married the two systems to better track SNM inventories and sequence waste from the point of generation, through the PFNW facility, and back to the Hanford site for final disposition. This tool, known as the Treatment Integration and Planning Tool (TIPT), has become a robust planning tool that provides real-time data to support compliant and efficient waste generation, transportation, treatment, and disposition. TIPT is developing into the next generation tool that will change the way in which legacy wastes, retrieval wastes and decontamination and decommissioning operations are conducted on the Plateau Remediation Contract (PRC). The real value of the TIPT is its predictive capability. It allows the W and FMP to map out optimal windows for processing waste through the PFNW facility, or through any process that is in some way resource limited. It allows project managers to identify and focus on problem areas before shipments are affected. It has been modified for use in broader applications to predict turnaround times and identify windows of opportunity for processing higher gram wastes through PFNW and to allow waste generators, site-wide, to accurately predict scope, cost, and schedule for waste generation to optimize processing and eliminate storage, double handling, and related costs and unnecessary safety risks. The TIPT addresses the years old problem of how to effectively predict not only what needs to be done, but when. 'When' is the key planning parameter that has been ignored by the generator and processor for many years, but has proven to be the most important parameter for both parties. While further refinement is a natural part of any development process, the current improvements on the TIPT have shown that prediction is a powerful consideration. Even in lean times expected for the foreseeable future, the improved TIPT continues to play a central role in managing our way through those times to assure facilities remain viable and available. It is recommended that other major remediation projects and waste processing facilities incorporate a tool such as TIPT to improve customer-commercial supplier communications and better optimization of resources. (authors)

  3. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. Army – Project 214 Analysis of Regulations Associated with Implementation of a Rocky Mountain Secure Smart-Grid

    SciTech Connect

    Warwick, William M.

    2010-09-30

    This document describes technical assistance provided by PNNL to further develop a smart grid technologies concept to provide a basis for policies and plans for the US Army. The effort was to analyze the potential to utilize emerging smart grid technologies along with indigenous renewable and other resources to meet the emergency and other power needs of Department of Defense facilities in Colorado and Wyoming.

  4. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. Army – Project 276 Renewable Resource Development on Department of Defense Bases in Alaska: Challenges and Opportunities

    SciTech Connect

    Warwick, William M.

    2010-09-30

    The potential to increase utilization of renewable energy sources among military facilities in Alaska through coordinated development and operation is the premise of this task. The US Army Pacific Command requested assistance from PNNL to help develop a more complete understanding of the context for wheeling power within Alaska, including legal and regulatory barriers that may prohibit the DOD facilities from wheeling power among various locations to optimize the development and use of renewable resources.

  5. Actual and potential use of population viability analyses in recovery of plant species listed under the US endangered species act.

    PubMed

    Zeigler, Sara L; Che-Castaldo, Judy P; Neel, Maile C

    2013-12-01

    Use of population viability analyses (PVAs) in endangered species recovery planning has been met with both support and criticism. Previous reviews promote use of PVA for setting scientifically based, measurable, and objective recovery criteria and recommend improvements to increase the framework's utility. However, others have questioned the value of PVA models for setting recovery criteria and assert that PVAs are more appropriate for understanding relative trade-offs between alternative management actions. We reviewed 258 final recovery plans for 642 plants listed under the U.S. Endangered Species Act to determine the number of plans that used or recommended PVA in recovery planning. We also reviewed 223 publications that describe plant PVAs to assess how these models were designed and whether those designs reflected previous recommendations for improvement of PVAs. Twenty-four percent of listed species had recovery plans that used or recommended PVA. In publications, the typical model was a matrix population model parameterized with ≤5 years of demographic data that did not consider stochasticity, genetics, density dependence, seed banks, vegetative reproduction, dormancy, threats, or management strategies. Population growth rates for different populations of the same species or for the same population at different points in time were often statistically different or varied by >10%. Therefore, PVAs parameterized with underlying vital rates that vary to this degree may not accurately predict recovery objectives across a species' entire distribution or over longer time scales. We assert that PVA, although an important tool as part of an adaptive-management program, can help to determine quantitative recovery criteria only if more long-term data sets that capture spatiotemporal variability in vital rates become available. Lacking this, there is a strong need for viable and comprehensive methods for determining quantitative, science-based recovery criteria for

  6. A Low Cost, Self Acting, Liquid Hydrogen Boil-Off Recovery System

    NASA Technical Reports Server (NTRS)

    Pelfrey, Joy W.; Sharp, Kirk V. (Technical Monitor)

    2001-01-01

    The purpose of this research was to develop a prototype liquid hydrogen boll-off recovery system. Perform analyses to finalize recovery system cycle, design detail components, fabricate hardware, and conduct sub-component, component, and system level tests leading to the delivery of a prototype system. The design point and off-design analyses identified cycle improvements to increase the robustness of the system by adding a by-pass heat exchanger. Based on the design, analysis, and testing conducted, the recovery system will liquefy 31% of the gaseous boil off from a liquid hydrogen storage tank. All components, including a high speed, miniature turbocompressor, were designed and manufacturing drawings were created. All hardware was fabricated and tests were conducted in air, helium, and hydrogen. Testing validated the design, except for the turbocompressor. A rotor-to-stator clearance issue was discovered as a result of a concentricity tolerance stack-up.

  7. Special Report on The Department of Energy's Acquisition Workforce and its Impact on Implementation of the American Recovery and Reinvestment Act of 2009

    SciTech Connect

    2009-03-01

    Signed by the President on February 17, 2009, the American Recovery and Reinvestment Act of 2009 (Recovery Act) seeks to strengthen the U.S. economy through the creation of new jobs, aiding State and local governments with budget shortfalls, and investing in the long-term health of the Nation's economic prosperity. Under the Recovery Act, the Department of Energy will receive approximately $40 billion for various energy, environmental, and science programs and initiatives. To have an immediate stimulative impact on the U.S. economy, the Department's stated goal is to ensure that these funds are spent as expeditiously as possible, without risking transparency and accountability. Given the Department's almost total reliance on the acquisition process (contracts, grants, cooperative agreements, etc.) to carry out its mission, enhanced focus on contract administration and, specifically, the work performed by Federal acquisition officials is of vital importance as the unprecedented flow of funds begins under the Recovery Act.

  8. 48 CFR 52.204-11 - American Recovery and Reinvestment Act-Reporting Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Text of Provisions and Clauses 52.204-11 American Recovery and Reinvestment Act—Reporting Requirements... Contractor's existing practice for describing jobs as long as the terms used are widely understood and... terms used are widely understood and describe the general nature of the work; and (B) An estimate of...

  9. NEPA/CERCLA/RCRA (National Environmental Policy Act/Comprehensive Environmental Response, Compensation, and Liability Act/Resource Conservation and Recovery Act) integration

    SciTech Connect

    Sharples, F.E.; Smith, E.D.

    1989-01-01

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requires that decisions concerning remedial actions at Superfund sites be made through a formal decisionmaking process known as Remedial Investigation/Feasibility Study (RI/FS). Many of the elements of this process are similar to the steps in the process required to comply with the National Environmental Policy Act (NEPA). Both processes, for example, involve the identification and analysis of alternative courses of action, provide for public disclosure and participation in the processes, and are documented by Records of Decision. This document discusses the applicability of NEPA to federal facility remedial actions and the advisability of integrating the NEPA process with the CERCLA and RCRA processes. Included are points addressed by panelists and recent developments. 3 refs.

  10. Disemployment effects caused by regulation of drilling fluids and produced waters as hazardous under the Resource Conservation and Recovery Act

    SciTech Connect

    Flaim, S.J.

    1988-03-01

    This report reviews and compares several studies of the effects on employment of regulating wastes from oil and natural gas exploration and extraction under the Resource Conservation and Recovery Act (RCRA). The waste management scenarios on which most of the studies were based were developed by the U.S. Environmental Protection Agency. The analyses show that as many as 500,000-700,000 jobs may be lost in the first year if RCRA Subtitle C rules are applied to drilling fluids and produced waters. As a results, unemployment in major oil-producing states could rise by as much as six percentage points. 13 refs., 4 tabs.

  11. Audit Report on "Waste Processing and Recovery Act Acceleration Efforts for Contact-Handled Transuranic Waste at the Hanford Site"

    SciTech Connect

    2010-05-01

    The Department of Energy's Office of Environmental Management's (EM), Richland Operations Office (Richland), is responsible for disposing of the Hanford Site's (Hanford) transuranic (TRU) waste, including nearly 12,000 cubic meters of radioactive contact-handled TRU wastes. Prior to disposing of this waste at the Department's Waste Isolation Pilot Plant (WIPP), Richland must certify that it meets WIPP's waste acceptance criteria. To be certified, the waste must be characterized, screened for prohibited items, treated (if necessary) and placed into a satisfactory disposal container. In a February 2008 amendment to an existing Record of Decision (Decision), the Department announced its plan to ship up to 8,764 cubic meters of contact-handled TRU waste from Hanford and other waste generator sites to the Advanced Mixed Waste Treatment Project (AMWTP) at Idaho's National Laboratory (INL) for processing and certification prior to disposal at WIPP. The Department decided to maximize the use of the AMWTP's automated waste processing capabilities to compact and, thereby, reduce the volume of contact-handled TRU waste. Compaction reduces the number of shipments and permits WIPP to more efficiently use its limited TRU waste disposal capacity. The Decision noted that the use of AMWTP would avoid the time and expense of establishing a processing capability at other sites. In May 2009, EM allocated $229 million of American Recovery and Reinvestment Act of 2009 (Recovery Act) funds to support Hanford's Solid Waste Program, including Hanford's contact-handled TRU waste. Besides providing jobs, these funds were intended to accelerate cleanup in the short term. We initiated this audit to determine whether the Department was effectively using Recovery Act funds to accelerate processing of Hanford's contact-handled TRU waste. Relying on the availability of Recovery Act funds, the Department changed course and approved an alternative plan that could increase costs by about $25 million

  12. Resource Conservation and Recovery Act industrial site environmental restoration site characterization report - area 6 steam cleaning effluent ponds

    SciTech Connect

    1996-09-01

    The Area 6 North and South Steam Cleaning Effluent Ponds (SCEPs) are historic disposal units located at the Nevada Test Site (NTS) in Nye County, Nevada. The NTS is operated by the U.S. Department of Energy, Nevada Operations Office (DOE/NV) which has been required by the Nevada Division of Environmental Protection (NDEP) to characterize the site under the requirements of the Resource Conservation and Recovery Act (RCRA) Part B Permit for the NTS and Title 40 Code of Federal Regulations, Part 265.

  13. Resource Conservation and Recovery Act corrective measures study: Area 6 decontamination pond facility, corrective action unit no. 92

    SciTech Connect

    1997-10-01

    Corrective Action Unit (CAU) No. 92, the Area 6 Decontamination Pond Facility (DPF), is an historic disposal unit located at the Nevada Test Site (NTS) in Nye County, Nevada (Figures 1 - 1, 1-2, and 1-3). The NTS is operated by the U.S. Department of Energy, Nevada Operations Office (DOE/NV), which has been required by the Nevada Division of Environmental Protection (NDEP) to characterize the DPF under the requirements of the Resource Conservation and Recovery Act (RCRA) Part A Permit (NDEP, 1995) for the NTS and Title 40 Code of Federal Regulations (CFR) Part 265 (1996c). The DPF is prioritized in the Federal Facility Agreement and Consent Order (FFACO, 1996) but is governed by the permit. The DPF was characterized through sampling events in 1994, 1996, and 1997. The results of these sampling events are contained in the Final Resource Conservation and Recovery Act Industrial Site Environmental Restoration Site Characterization Report, Area 6 Decontamination Pond Facility, Revision I (DOE/NV, 1997). This Corrective Measures Study (CMS) for the Area 6 DPF has been prepared for the DOE/NV`s Environmental Restoration Project. The CMS has been developed to support the preparation of a Closure Plan for the DPF. Because of the complexities of the contamination and regulatory issues associated with the DPF, DOE/NV determined a CMS would be beneficial to the evaluation and selection of a closure alternative.

  14. 43 CFR 12.916 - Resource Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... developed by the Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local... (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962). 12.916 Section 12.916 Public Lands: Interior Office... Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962). Under the Act, any...

  15. 43 CFR 12.916 - Resource Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... developed by the Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local... (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962). 12.916 Section 12.916 Public Lands: Interior Office... Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962). Under the Act, any...

  16. 43 CFR 12.916 - Resource Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... developed by the Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local... (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962). 12.916 Section 12.916 Public Lands: Interior Office... Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962). Under the Act, any...

  17. 43 CFR 12.916 - Resource Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... developed by the Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local... (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962). 12.916 Section 12.916 Public Lands: Interior Office... Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962). Under the Act, any...

  18. 43 CFR 12.916 - Resource Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... developed by the Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State and local... (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962). 12.916 Section 12.916 Public Lands: Interior Office... Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962). Under the Act, any...

  19. 15 CFR 14.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR... (RCRA). 14.16 Section 14.16 Commerce and Foreign Trade Office of the Secretary of Commerce UNIFORM... Act (RCRA). Under RCRA (Pub. L. 94-580, 42 U.S.C. 6962), any State agency or agency of a...

  20. 15 CFR 14.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR... (RCRA). 14.16 Section 14.16 Commerce and Foreign Trade Office of the Secretary of Commerce UNIFORM... Act (RCRA). Under RCRA (Pub. L. 94-580, 42 U.S.C. 6962), any State agency or agency of a...

  1. 15 CFR 14.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR... (RCRA). 14.16 Section 14.16 Commerce and Foreign Trade Office of the Secretary of Commerce UNIFORM... Act (RCRA). Under RCRA (Pub. L. 94-580, 42 U.S.C. 6962), any State agency or agency of a...

  2. 15 CFR 14.16 - Resource Conservation and Recovery Act (RCRA).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... recycled materials identified in guidelines developed by the Environmental Protection Agency (EPA) (40 CFR... (RCRA). 14.16 Section 14.16 Commerce and Foreign Trade Office of the Secretary of Commerce UNIFORM... Act (RCRA). Under RCRA (Pub. L. 94-580, 42 U.S.C. 6962), any State agency or agency of a...

  3. Impacts of the Resource Conservation and Recovery Act on energy supply

    NASA Astrophysics Data System (ADS)

    Carnes, S. A.; Copenhaver, E. D.; Weeter, D. W.; Calzonetti, F. J.; Tevepaugh, C. W.; Parzyck, D. C.

    1980-10-01

    The signficant characteristics of the waste streams of representative technologies of different energy supply alternatives are reported, including coal combustion and conversion, solar, geothermal, oil sands, oil shales, and petroleum refining. The overall relationship of RCRA and energy issues was examined, with special emphasis on how RCRA's hazardous waste provisions impact with these technologies. The issues addressed were: the magnitude of energy related waste; public and private sector responses to RCRA and energy waste problems; the relationship of RCRA to other environmental and public health protection policies; the effect of RCRA on the deployment of energy supply; the role of reuse, recovery, and utilization of energy waste; and possible health and environmental effects associated with solid or hazardous wastes of various energy supply systems.

  4. Resource Conservation and Recovery Act closure report: Area 2 Bitcutter and Postshot Containment Shops Injection Wells, Correction Action Unit 90

    SciTech Connect

    1996-12-01

    This Closure Report provides documentation of the activities conducted during the Resource Conservation and Recovery Act (RCRA) closure of the Bitcutter and Postshot Containment Shops Injection Wells located in Area 2 of the Nevada Test Site (NTS), Oak Spring Quadrangle (USGS, 1986), Township 10 South, Range 53 East, Nye County, Nevada. This report discusses the Bitcutter Shop Inside Injection Well (CAU 90-A) closure-in-place and the Bitcutter Shop Outside Injection Well (CAU 90-B) and Postshot Containment Shop Injection Well (CAU 90-C) clean closures. This Closure Report provides background information about the unit, the results of the characterization activities and actions conducted to determine the closure design. It also provides a discussion of the drainage analysis, preliminary closure activities, final closure activities, waste management activities, and the Post-Closure Care requirements.

  5. Brooktrout Lake case study: biotic recovery from acid deposition 20 years after the 1990 Clean Air Act Amendments.

    PubMed

    Sutherland, James W; Acker, Frank W; Bloomfield, Jay A; Boylen, Charles W; Charles, Donald F; Daniels, Robert A; Eichler, Lawrence W; Farrell, Jeremy L; Feranec, Robert S; Hare, Matthew P; Kanfoush, Sharon L; Preall, Richard J; Quinn, Scott O; Rowell, H Chandler; Schoch, William F; Shaw, William H; Siegfried, Clifford A; Sullivan, Timothy J; Winkler, David A; Nierzwicki-Bauer, Sandra A

    2015-03-01

    The Adirondack Mountain region is an extensive geographic area (26,305 km(2)) in upstate New York where acid deposition has negatively affected water resources for decades and caused the extirpation of local fish populations. The water quality decline and loss of an established brook trout (Salvelinus fontinalis [Mitchill]) population in Brooktrout Lake were reconstructed from historical information dating back to the late 1880s. Water quality and biotic recovery were documented in Brooktrout Lake in response to reductions of S deposition during the 1980s, 1990s, and 2000s and provided a unique scientific opportunity to re-introduce fish in 2005 and examine their critical role in the recovery of food webs affected by acid deposition. Using C and N isotope analysis of fish collagen and state hatchery feed as well as Bayesian assignment tests of microsatellite genotypes, we document in situ brook trout reproduction, which is the initial phase in the restoration of a preacidification food web structure in Brooktrout Lake. Combined with sulfur dioxide emissions reductions promulgated by the 1990 Clean Air Act Amendments, our results suggest that other acid-affected Adirondack waters could benefit from careful fish re-introduction protocols to initiate the ecosystem reconstruction of important components of food web dimensionality and functionality.

  6. Brooktrout Lake case study: biotic recovery from acid deposition 20 years after the 1990 Clean Air Act Amendments.

    PubMed

    Sutherland, James W; Acker, Frank W; Bloomfield, Jay A; Boylen, Charles W; Charles, Donald F; Daniels, Robert A; Eichler, Lawrence W; Farrell, Jeremy L; Feranec, Robert S; Hare, Matthew P; Kanfoush, Sharon L; Preall, Richard J; Quinn, Scott O; Rowell, H Chandler; Schoch, William F; Shaw, William H; Siegfried, Clifford A; Sullivan, Timothy J; Winkler, David A; Nierzwicki-Bauer, Sandra A

    2015-03-01

    The Adirondack Mountain region is an extensive geographic area (26,305 km(2)) in upstate New York where acid deposition has negatively affected water resources for decades and caused the extirpation of local fish populations. The water quality decline and loss of an established brook trout (Salvelinus fontinalis [Mitchill]) population in Brooktrout Lake were reconstructed from historical information dating back to the late 1880s. Water quality and biotic recovery were documented in Brooktrout Lake in response to reductions of S deposition during the 1980s, 1990s, and 2000s and provided a unique scientific opportunity to re-introduce fish in 2005 and examine their critical role in the recovery of food webs affected by acid deposition. Using C and N isotope analysis of fish collagen and state hatchery feed as well as Bayesian assignment tests of microsatellite genotypes, we document in situ brook trout reproduction, which is the initial phase in the restoration of a preacidification food web structure in Brooktrout Lake. Combined with sulfur dioxide emissions reductions promulgated by the 1990 Clean Air Act Amendments, our results suggest that other acid-affected Adirondack waters could benefit from careful fish re-introduction protocols to initiate the ecosystem reconstruction of important components of food web dimensionality and functionality. PMID:25621941

  7. Recovery Act: A Low Cost Spray Deposited Solar PV Anti-Reflection Coating Final Technical Report

    SciTech Connect

    Harvey, Michael D.

    2010-08-30

    PV module glass is typically low iron glass which exhibits extremely low absorption of light at solar wavelengths. However, reflection losses from typical high quality solar glass are about 4.5% of the input solar energy. By applying an antireflection coating to the cover glass of their modules, a PV module maker will gain at least a 3% increase in the light passing through the glass and being converted to electricity. Thus achieving an increase of >3% in electricity output from the modules. This Project focussed on developing a process that deposits a layer of porous silica (SiO2) on glass or plastic components, and testing the necessary subcomponents and subsystems required to demonstrate the commercial technology. This porous layer acts as a broadband single layer AR coating for glass and plastics, with the added benefit of being a hydrophilic surface for low surface soiling.

  8. Recovery Act: Johnston Rhode Island Combined Cycle Electric Generating Plant Fueled by Waste Landfill Gas

    SciTech Connect

    Galowitz, Stephen

    2013-06-30

    The primary objective of the Project was to maximize the productive use of the substantial quantities of waste landfill gas generated and collected at the Central Landfill in Johnston, Rhode Island. An extensive analysis was conducted and it was determined that utilization of the waste gas for power generation in a combustion turbine combined cycle facility was the highest and best use. The resulting project reflected a cost effective balance of the following specific sub-objectives. 1) Meet environmental and regulatory requirements, particularly the compliance obligations imposed on the landfill to collect, process and destroy landfill gas. 2) Utilize proven and reliable technology and equipment. 3) Maximize electrical efficiency. 4) Maximize electric generating capacity, consistent with the anticipated quantities of landfill gas generated and collected at the Central Landfill. 5) Maximize equipment uptime. 6) Minimize water consumption. 7) Minimize post-combustion emissions. To achieve the Project Objective the project consisted of several components. 1) The landfill gas collection system was modified and upgraded. 2) A State-of-the Art gas clean up and compression facility was constructed. 3) A high pressure pipeline was constructed to convey cleaned landfill gas from the clean-up and compression facility to the power plant. 4) A combined cycle electric generating facility was constructed consisting of combustion turbine generator sets, heat recovery steam generators and a steam turbine. 5) The voltage of the electricity produced was increased at a newly constructed transformer/substation and the electricity was delivered to the local transmission system. The Project produced a myriad of beneficial impacts. 1) The Project created 453 FTE construction and manufacturing jobs and 25 FTE permanent jobs associated with the operation and maintenance of the plant and equipment. 2) By combining state-of-the-art gas clean up systems with post combustion emissions control

  9. Preliminary Audit Report on "Management Controls over the Commonwealth of Virginia's Efforts to Implement the American Recovery and Reinvestment Act Weatherization Assistance Program"

    SciTech Connect

    2010-05-01

    The Department of Energy's (Department) Weatherization Assistance Program received $5 billion under the American Recovery and Reinvestment Act of 2009 (Recovery Act) to improve the energy efficiency of homes, multi-family rental units and mobile homes owned or occupied by low-income persons. Subsequently, the Department awarded a three-year Weatherization Assistance Program grant for $94 million to the Commonwealth of Virginia (Virginia). This grant provided more than a ten-fold increase in funds available to Virginia for weatherization over that authorized in Fiscal Year (FY) 2009. Corresponding to the increase in funding, the Recovery Act increased the limit on the average amount spent to weatherize a home (unit) from $2,500 to $6,500. Virginia's Department of Housing and Community Development (DHCD) administers the Recovery Act grant through 22 local community action agencies. These agencies (sub-grantees) are responsible for determining applicant eligibility, weatherizing homes, and conducting home assessments and inspections. Typical weatherization services include installing insulation; sealing ducts; tuning and repairing furnaces; and, mitigating heat loss through windows, doors and other infiltration points. Virginia plans to use its Recovery Act Weatherization funding to weatherize about 9,193 units over the life of the grant - a significant increase over the 1,475 housing units that were planned to be completed in FY 2009. Given the significant increase in funding and the demands associated with weatherizing thousands of homes, we initiated this audit to determine if Virginia had adequate safeguards in place to ensure that the Weatherization Program was managed efficiently and effectively. The State of Virginia's DHCD had not implemented financial and reporting controls needed to ensure Weatherization Program funds are spent effectively and efficiently. Specifically, DHCD had not: (1) Performed on-site financial monitoring of any of its sub-grantees under

  10. What Does It Take? California County Funding Requests for Recovery-Oriented Full Service Partnerships Under the Mental Health Services Act

    PubMed Central

    Cashin, Cheryl E.; Brown, Timothy T.

    2010-01-01

    The need to move mental health systems toward more recovery-oriented treatment modes is well established. Progress has been made to define needed changes but evidence is lacking about the resources required to implement them. The Mental Health Services Act (MHSA) in California was designed to implement more recovery-oriented treatment modes. We use data from county funding requests and annual updates to examine how counties budgeted for recovery-oriented programs targeted to different age groups under MHSA. Findings indicate that initial per-client budgeting for Full Services Partnerships under MHSA was maintained in future cycles and counties budgeted less per client for children. With this analysis, we begin to benchmark resource allocation for programs that are intended to be recovery-oriented, which should be evaluated against appropriate outcome measures in the future to determine the degree of recovery-orientation. PMID:20440560

  11. 75 FR 22432 - Sunshine Act Meetings; Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-28

    ... Task Force. FY 2011 Budget Request Update. ARRA Update. Strategic Plan Update. NSB Budget. Other... From the Federal Register Online via the Government Publishing Office NATIONAL SCIENCE FOUNDATION National Science Board Sunshine Act Meetings; Notice The National Science Board, pursuant to...

  12. Special Report on the "Department of Energy's Efforts to Meet Accountability and Performance Reporting Objectives of the American Recovery and Reinvestment Act"

    SciTech Connect

    2009-09-01

    The purpose of the American Recovery and Reinvestment Act of 2009 (Recovery Act) was to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in health and science, and invest in the Nation's energy future. The Department of Energy will receive an unprecedented $38 billion in Recovery Act funding to support a variety of science, energy, and environmental initiatives. The Recovery Act requires transparency and accountability over these funds. To this end, the Office of Management and Budget (OMB) issued guidance requiring the Department to compile and report a wide variety of funding, accounting, and performance information. The Department plans to leverage existing information systems to develop accounting and performance information that will be used by program managers and ultimately reported to Recovery.gov, the government-wide source of Recovery Act information, and to OMB. The Department's iManage iPortal, a system that aggregates information from a number of corporate systems, will serve as the main reporting gateway for accounting information. In addition, the Department plans to implement a methodology or system that will permit it to monitor information reported directly to OMB by prime funding recipients. Furthermore, performance measures or metrics that outline expected outcomes are being developed, with results ultimately to be reported in a recently developed Department-wide system. Because of the significance of funds provided and their importance to strengthening the Nation's economy, we initiated this review to determine whether the Department had taken the steps necessary to ensure that Recovery Act funds can be appropriately tracked and are transparent to the public, and whether the benefits of the expenditures can be properly measured and reported clearly, accurately, and in a timely manner. Although not yet fully mature, we found that the Department's efforts to develop, refine, and apply the control structure

  13. Emotion and ambulatory EHR in the ARRA era.

    PubMed

    Berlin, Amy

    2010-01-01

    There is a growing focus in change management literature on the role of emotion in managing change. Barriers to adoption and effective implementation of ambulatory EHR-ranging from technical to financial to logistical-are well-described in the health-care IT literature. In the ARRA era, ambulatory practices are under increasing pressure to overcome these barriers. This article explores the emotional barriers to EHR adoption and implementation in ambulatory settings, synthesizing ideas drawn from business and psychology literature on emotion in organizational change. Key strategies for assessing and addressing these barriers are outlined.

  14. Idaho National Laboratory’s Analysis of ARRA-Funded Plug-in Electric Vehicle and Charging Infrastructure Projects: Final Report

    SciTech Connect

    Francfort, Jim; Bennett, Brion; Carlson, Richard; Garretson, Thomas; Gourley, LauraLee; Karner, Donal; McGuire, Patti; Scoffield, Don; Kirkpatrick, Mindy; Shrik, Matthew; Salisbury, Shawn; Schey, Stephen; Smart, John; White, Sera; Wishard, Jeffery

    2015-09-01

    Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s (DOE) Idaho National Laboratory (INL), is the lead laboratory for U.S. Department of Energy’s Advanced Vehicle Testing Activity (AVTA). INL’s conduct of the AVTA resulted in a significant base of knowledge and experience in the area of testing light-duty vehicles that reduced transportation-related petroleum consumption. Due to this experience, INL was tasked by DOE to develop agreements with companies that were the recipients of The American Recovery and Reinvestment Act of 2009 (ARRA) grants, that would allow INL to collect raw data from light-duty vehicles and charging infrastructure. INL developed non-disclosure agreements (NDAs) with several companies and their partners that resulted in INL being able to receive raw data via server-to-server connections from the partner companies. This raw data allowed INL to independently conduct data quality checks, perform analysis, and report publicly to DOE, partners, and stakeholders, how drivers used both new vehicle technologies and the deployed charging infrastructure. The ultimate goal was not the deployment of vehicles and charging infrastructure, cut rather to create real-world laboratories of vehicles, charging infrastructure and drivers that would aid in the design of future electric drive transportation systems. The five projects that INL collected data from and their partners are: • ChargePoint America - Plug-in Electric Vehicle Charging Infrastructure Demonstration • Chrysler Ram PHEV Pickup - Vehicle Demonstration • General Motors Chevrolet Volt - Vehicle Demonstration • The EV Project - Plug-in Electric Vehicle Charging Infrastructure Demonstration • EPRI / Via Motors PHEVs – Vehicle Demonstration The document serves to benchmark the performance science involved the execution, analysis and reporting for the five above projects that provided lessons learned based on driver’s use of the

  15. ARRA-funded VS30 measurements using multi-technique approach at strong-motion stations in California and central-eastern United States

    USGS Publications Warehouse

    Yong, Alan; Martin, Antony; Stokoe, Kenneth; Diehl, John

    2013-01-01

    Funded by the 2009 American Recovery and Reinvestment Act (ARRA), we conducted geophysical site characterizations at 191 strong-motion stations: 187 in California and 4 in the Central-Eastern United States (CEUS). The geophysical methods used at each site included passive and active surface-wave and body-wave techniques. Multiple techniques were used at most sites, with the goal of robustly determining VS (shear-wave velocity) profiles and VS30 (the time-averaged shear-wave velocity in the upper 30 meters depth). These techniques included: horizontal-to-vertical spectral ratio (HVSR), two-dimensional (2-D) array microtremor (AM), refraction microtremor (ReMi™), spectral analysis of surface wave (SASW), multi-channel analysis of surface waves (Rayleigh wave: MASRW; and Love wave: MASLW), and compressional- and shear-wave refraction. Of the selected sites, 47 percent have crystalline, volcanic, or sedimentary rock at the surface or at relatively shallow depth, and 53 percent are of Quaternary sediments located in either rural or urban environments. Calculated values of VS30 span almost the full range of the National Earthquake Hazards Reduction Program (NEHRP) Site Classes, from D (stiff soils) to B (rock). The NEHRP Site Classes based on VS30 range from being consistent with the Class expected from analysis of surficial geology, to being one or two Site Classes below expected. In a few cases where differences between the observed and expected Site Class occurred, it was the consequence of inaccurate or coarse geologic mapping, as well as considerable degradation of the near-surface rock. Additionally, several sites mapped as rock have Site Class D (stiff soil) velocities, which is due to the extensive weathering of the surficial rock.

  16. 28 CFR 70.16 - Resource Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State... (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962). 70.16 Section 70.16 Judicial Administration... Requirements § 70.16 Resource Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C....

  17. 28 CFR 70.16 - Resource Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State... (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962). 70.16 Section 70.16 Judicial Administration... Requirements § 70.16 Resource Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C....

  18. 28 CFR 70.16 - Resource Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State... (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962). 70.16 Section 70.16 Judicial Administration... Requirements § 70.16 Resource Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C....

  19. 28 CFR 70.16 - Resource Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State... (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962). 70.16 Section 70.16 Judicial Administration... Requirements § 70.16 Resource Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C....

  20. 28 CFR 70.16 - Resource Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... guidelines developed by the Environmental Protection Agency (EPA) (40 CFR parts 247-254). Accordingly, State... (RCRA) (Pub. L. 94-580 codified at 42 U.S.C. 6962). 70.16 Section 70.16 Judicial Administration... Requirements § 70.16 Resource Conservation and Recovery Act (RCRA) (Pub. L. 94-580 codified at 42 U.S.C....

  1. A Measurement of Readiness for Tennessee Hospitals to Implement "Meaningful Use" Criteria Resulting from the American Recovery and Reinvestment Act, 2009

    ERIC Educational Resources Information Center

    Wilhoit, Kathryn W.

    2012-01-01

    In 2009, the American Recovery and Reinvestment Act was signed into law. This legislation provided for monetary rewards for those acute-care hospitals that meet "meaningful use" computerization and reporting criteria. The study used a descriptive, nonexperimental design to answer three research questions (1) What is the level of readiness to meet…

  2. Disaster Recovery Improvement Act

    THOMAS, 112th Congress

    Rep. Scalise, Steve [R-LA-1

    2011-01-05

    01/06/2011 Referred to the Subcommittee on Economic Development, Public Buildings and Emergency Management. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  3. School Food Recovery Act

    THOMAS, 112th Congress

    Rep. Petri, Thomas E. [R-WI-6

    2011-01-06

    02/25/2011 Referred to the Subcommittee on Early Childhood, Elementary, and Secondary Education. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  4. School Food Recovery Act

    THOMAS, 112th Congress

    Sen. Feinstein, Dianne [D-CA

    2011-10-17

    10/17/2011 Read twice and referred to the Committee on Agriculture, Nutrition, and Forestry. (text of measure as introduced: CR S6604) (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  5. Recovery Act: Increasing the Public's Understanding of What Funds Are Being Spent on and What Outcomes Are Expected. Report to the Republican Leader, U.S. Senate. GAO-10-581

    ERIC Educational Resources Information Center

    US Government Accountability Office, 2010

    2010-01-01

    A hallmark of efforts to implement the $862 billion American Recovery and Reinvestment Act of 2009 (Recovery Act) is to be transparent and accountable about what the money is being spent on and what is being achieved. To help achieve these goals, recipients are to report every 3 months on their award activities and expected outcomes, among other…

  6. Recovery Act: Planned Efforts and Challenges in Evaluating Compliance with Maintenance of Effort and Similar Provisions. Report to the Republican Leader, U.S. Senate. GAO-10-247

    ERIC Educational Resources Information Center

    Dodaro, Gene L.

    2009-01-01

    To help prevent the substitution of federal funds for state, local, or private funds, the American Recovery and Reinvestment Act of 2009 (Recovery Act) contains maintenance of effort and similar provisions requiring that recipients maintain certain levels of spending for selected programs. This report provides information on selected programs in…

  7. Performance test results of noninvasive characterization of Resource Conservation and Recovery Act surrogate waste by prompt gamma neutron activation analysis

    SciTech Connect

    Gehrke, R.J.; Streier, G.G.

    1997-03-01

    During FY-96, a performance test was carried out with funding from the Mixed Waste Focus Area (MWFA) of the Department of Energy (DOE) to determine the noninvasive elemental assay capabilities of commercial companies for Resource Conservation and Recovery Act (RCRA) metals present in 8-gal drums containing surrogate waste. Commercial companies were required to be experienced in the use of prompt gamma neutron activation analysis (PGNAA) techniques and to have a prototype assay system with which to conduct the test assays. Potential participants were identified through responses to a call for proposals advertised in the Commerce Business Daily and through personal contacts. Six companies were originally identified. Two of these six were willing and able to participate in the performance test, as described in the test plan, with some subsidizing from the DOE MWFA. The tests were conducted with surrogate sludge waste because (1) a large volume of this type of waste awaits final disposition and (2) sludge tends to be somewhat homogeneous. The surrogate concentrations of the above RCRA metals ranged from {approximately} 300 ppm to {approximately} 20,000 ppm. The lower limit was chosen as an estimate of the expected sensitivity of detection required by noninvasive, pretreatment elemental assay systems to be of value for operational and compliance purposes and to still be achievable with state-of-the-art methods of analysis. The upper limit of {approximately} 20,000 ppm was chosen because it is the opinion of the author that assay above this concentration level is within current state-of-the-art methods for most RCRA constituents. This report is organized into three parts: Part 1, Test Plan to Evaluate the Technical Status of Noninvasive Elemental Assay Techniques for Hazardous Waste; Part 2, Participants` Results; and Part 3, Evaluation of and Comments on Participants` Results.

  8. Special Report on Review of "The Department of Energy's Quality Assurance Process for Prime Recipients' Reporting for the American Recovery and Reinvestment Act"

    SciTech Connect

    2009-10-01

    The American Recovery and Reinvestment Act of 2009 (Recovery Act) was established to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in health and science, and invest in the Nation's energy future. The Department of Energy (Department) will receive an unprecedented $37 billion in Recovery Act funding to support a variety of science, energy, and environmental initiatives. The majority of the funding received by the Department will be allocated to various recipients through grants, cooperative agreements, contracts, and other financial instruments. To ensure transparency and accountability, the Office of Management and Budget (OMB) requires that recipients report on their receipt and use of Recovery Act funds on a quarterly basis to FederalReporting.gov. OMB also specifies that Federal agencies should develop and implement formal procedures to help ensure the quality of recipient reported information. Data that must be reported by recipients includes total funding received; funds expended or obligated; projects or activities for which funds were obligated or expended; and the number of jobs created and/or retained. OMB requires that Federal agencies perform limited data quality reviews of recipient data to identify material omissions and/or significant reporting errors and notify the recipients of the need to make appropriate and timely changes to erroneous reports. As part of a larger audit of recipient Recovery Act reporting and performance measurement and in support of a Government-wide review sponsored by the Recovery Accountability and Transparency Board, we completed an interim review to determine whether the Department had established a process to ensure the quality and accuracy of recipient reports. Our review revealed that the Department had developed a quality assurance process to facilitate the quarterly reviews of recipient data. The process included procedures to compare existing information from the Department

  9. 75 FR 29569 - Recovery Policy RP9526.1, Hazard Mitigation Funding Under Section 406 (Stafford Act)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ... SECURITY Federal Emergency Management Agency Recovery Policy RP9526.1, Hazard Mitigation Funding Under... availability. SUMMARY: This document provides notice of the final Recovery Policy RP9526.1, Hazard Mitigation... the appropriate use of hazard mitigation discretionary funding available under Section 406 of...

  10. INFORMATION: Audit Report on "Accounting and Reporting for the American Recovery and Reinvestment Act by the Department of Energy's Funding Recipients"

    SciTech Connect

    2010-04-01

    The American Recovery and Reinvestment Act of 2009 (Recovery Act) was established to jumpstart the U.S. economy, create or save millions of jobs, and invest in the Nation's energy future. The Department of Energy received approximately $37 billion through the Recovery Act to support a variety of science, energy and environmental initiatives. The Office of Management and Budget (OMB) issued guidance for carrying out stimulus-related activities which requires, among other things, that recipients ensure funds provided by the Recovery Act are clearly distinguishable from non-Recovery Act funds in all reporting systems and that recipients' actions are transparent to the public. To meet these requirements, the Department's recipients must clearly and accurately track and report on 18 separate data elements. In addition, the Department was to develop and implement a process to ensure that recipient information reported to the public was free from material omissions and significant reporting errors. Our recent report (OAS-RA-10-01, October 2009) noted that the Department had developed a quality assurance process to facilitate the quarterly reviews of recipient data and planned to test it during the first quarterly reporting cycle. To determine whether the Department's quality assurance process was effective, we examined information reported by recipients of Departmental funding as of September 30, 2009. We also sought to determine whether the Department's prime contractors were prepared to track and report on Recovery Act activities. The Department had taken a number of actions designed to ensure the accuracy and transparency of reported Recovery Act results. This process identified potential anomalies with information reported by 1,113 of 2,038, or 55 percent of recipients. We view the Department's data quality assurance efforts as both timely and significant. As noted by our audit testing, however, opportunities exist to strengthen the process. In particular: (1) Site

  11. Recovery Act. Sub-Soil Gas and Fluid Inclusion Exploration and Slim Well Drilling, Pumpernickel Valley, Nevada

    SciTech Connect

    Fairbank, Brian D.

    2015-03-27

    the DOE on February 13, 2014 that it would not be able to complete the project objectives before the recovery act awards deadline and submitted a mutual termination request to the DOE which was accepted.

  12. Reading Recovery Program 1990-91. Final Evaluation Report. Elementary and Secondary Education Act-Chapter 1.

    ERIC Educational Resources Information Center

    Pollock, John S.

    The purpose of the 1990-91 Reading Recovery Program in the Columbus, Ohio public schools was to provide early intervention to underachieving first-grade pupils who appeared unlikely to read successfully without intensive instruction. The program featured individualized one-on-one lessons provided by specially trained teachers. The lessons were…

  13. 75 FR 17919 - Submission for OMB Review; American Recovery and Reinvestment Act-One-time Reporting Requirements...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ... Government contract ( http://www.whitehouse.gov/omb/recovery_faqs_contractors ); d. A description of the... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF DEFENSE... for Prime Contractors. A request for public comments was published in the Federal Register at 74...

  14. 75 FR 5325 - Implementation of Section 5001 of the American Recovery and Reinvestment Act of 2009 for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-02

    ... (Medicaid) and XXI (CHIP) shall be 70 percent. The Medicare Improvements for Patients and Providers Act of... Northern Mariana Islands, and America Samoa made a one-time election between (1) a 30 percent increase...

  15. Recovery Act: Develop a Modular Curriculum for Training University Students in Industry Standard CO{sub 2} Sequestration and Enhanced Oil Recovery Methodologies

    SciTech Connect

    Trentham, R. C.; Stoudt, E. L.

    2013-05-31

    CO{sub 2} Enhanced Oil Recovery, Sequestration, & Monitoring Measuring & Verification are topics that are not typically covered in Geoscience, Land Management, and Petroleum Engineering curriculum. Students are not typically exposed to the level of training that would prepare them for CO{sub 2} reservoir and aquifer sequestration related projects when they begin assignments in industry. As a result, industry training, schools & conferences are essential training venues for new & experienced personnel working on CO{sub 2} projects for the first time. This project collected and/or generated industry level CO{sub 2} training to create modules which faculties can utilize as presentations, projects, field trips and site visits for undergrad and grad students and prepare them to "hit the ground running" & be contributing participants in CO{sub 2} projects with minimal additional training. In order to create the modules, UTPB/CEED utilized a variety of sources. Data & presentations from industry CO{sub 2} Flooding Schools & Conferences, Carbon Management Workshops, UTPB Classes, and other venues was tailored to provide introductory reservoir & aquifer training, state-of-the-art methodologies, field seminars and road logs, site visits, and case studies for students. After discussions with faculty at UTPB, Sul Ross, Midland College, other universities, and petroleum industry professionals, it was decided to base the module sets on a series of road logs from Midland to, and through, a number of Permian Basin CO{sub 2} Enhanced Oil Recovery (EOR) projects, CO{sub 2} Carbon Capture and Storage (CCUS) projects and outcrop equivalents of the formations where CO{sub 2} is being utilized or will be utilized, in EOR projects in the Permian Basin. Although road logs to and through these projects exist, none of them included CO{sub 2} specific information. Over 1400 miles of road logs were created, or revised specifically to highlight CO{sub 2} EOR projects. After testing a number of

  16. 75 FR 70947 - Notice of Lodging of Proposed Consent Decree Under the Resource Conservation and Recovery Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-19

    ... (RCRA) et seq., the pre-treatment requirements of the Federal Water Pollution Control Act (Clean Water... the State of $75,000 and Garvey will be required to sell his collection of classic cars, boats, and... Environmental Protection Agency, Region 7, 901 N. 5th St., Kansas City, KS 66101. During the public...

  17. 75 FR 22807 - Implementation of Section 5001 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    .... L. 111-5) for Adjustments to the Second Quarter of Fiscal Year 2010 Federal Medical Assistance Percentage Rates for Federal Matching Shares for Medicaid and Title IV-E Foster Care, Adoption Assistance and...) shall be 70 percent. The Medicare Improvements for Patients and Providers Act of 2008 (MIPPA) (Pub....

  18. 78 FR 661 - Waiver From Rescission of Unobligated Funds Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... the Federal Register. (Presidential Sig.) THE WHITE HOUSE, Washington, December 28, 2012. [FR Doc... Reinvestment Act with respect to the accounts described above. In accordance with section 1603(b) of the... that are rescinded pursuant to section 1603(b) shall be returned to the General Fund of the...

  19. RECOVERY POTENTIAL AS A MEANS OF PRIORITIZING RESTORATION OF WATERS IDENTIFIED AS IMPAIRED UNDER THE CLEAN WATER ACT

    EPA Science Inventory

    The sheer number of waterbodies identified as impaired under Section 303(d) of the Clean Water Act presents states with challenging decisions on which sites to address, in what order, and with what fraction of limited restoration resources. Our goal was to demonstrate a systemat...

  20. 75 FR 17919 - Submission for OMB Review; American Recovery and Reinvestment Act-Quarterly Reporting for Prime...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ... (NASA). ACTION: Notice of request for comments regarding an extension to an existing OMB clearance (9000-0169). SUMMARY: Under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. chapter 35), the.... A request for public comments was published in the Federal Register at 74 FR 14639, on March...

  1. Evaluating ARRA Programs and Other Educational Reforms: A Guide for States

    ERIC Educational Resources Information Center

    Perez-Johnson, Irma; Walters, Kirk; Puma, Michael; Herman, Rebecca; Garet, Michael; Heppen, Jessica; Lemke, Mariann; Aladjem, Daniel; Amin, Samia; Burghardt, John

    2011-01-01

    The American Institutes for Research (AIR) and Mathematica Policy Research (MPR) developed this guide to help you consider evaluation issues likely to arise as you launch ARRA-funded initiatives and other educational reform activities. Many states are already involved in evaluation, so many of the ideas presented here may be familiar. The authors…

  2. 75 FR 58379 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... Enhanced Surface Water Treatment Rule requirements of the Safe Drinking Water Act, and part of the work... Reinvestment Act of 2009 (ARRA) to the City of Lewiston, ME and the Auburn, Maine Water District AGENCY... satisfactory quality] to the City of Lewiston, Maine and the Auburn, Maine Water District...

  3. Analysis Results for ARRA Projects: Enabling Fuel Cell Market Transformation (Presentation)

    SciTech Connect

    Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.; Ainscough, C.; Saur, G.

    2012-06-01

    This presentation discusses analysis results for American Recovery and Reinvestment Act early market fuel cell deployments and describes the objective of the project and its relevance to the Department of Energy Hydrogen and Fuel Cells Program; NREL's analysis approach; technical accomplishments including publication of a fourth set of composite data products; and collaborations and future work.

  4. MD PHEV/EV ARRA Project Data Collection and Reporting (Presentation)

    SciTech Connect

    Walkowicz, K.; Ramroth, L.; Duran, A.; Rosen, B.

    2012-01-01

    This presentation describes a National Renewable Energy Laboratory project to collect and analyze commercial fleet deployment data from medium-duty plug-in hybrid electric and all-electric vehicles that were deployed using funds from the American Recovery and Reinvestment Act. This work supports the Department of Energy's Vehicle Technologies Program and its Advanced Vehicle Testing Activity.

  5. The Marine Mammal Protection Act at 40: status, recovery, and future of U.S. marine mammals.

    PubMed

    Roman, Joe; Altman, Irit; Dunphy-Daly, Meagan M; Campbell, Caitlin; Jasny, Michael; Read, Andrew J

    2013-05-01

    Passed in 1972, the Marine Mammal Protection Act has two fundamental objectives: to maintain U.S. marine mammal stocks at their optimum sustainable populations and to uphold their ecological role in the ocean. The current status of many marine mammal populations is considerably better than in 1972. Take reduction plans have been largely successful in reducing direct fisheries bycatch, although they have not been prepared for all at-risk stocks, and fisheries continue to place marine mammals as risk. Information on population trends is unknown for most (71%) stocks; more stocks with known trends are improving than declining: 19% increasing, 5% stable, and 5% decreasing. Challenges remain, however, and the act has generally been ineffective in treating indirect impacts, such as noise, disease, and prey depletion. Existing conservation measures have not protected large whales from fisheries interactions or ship strikes in the northwestern Atlantic. Despite these limitations, marine mammals within the U.S. Exclusive Economic Zone appear to be faring better than those outside, with fewer species in at-risk categories and more of least concern.

  6. The Marine Mammal Protection Act at 40: status, recovery, and future of U.S. marine mammals.

    PubMed

    Roman, Joe; Altman, Irit; Dunphy-Daly, Meagan M; Campbell, Caitlin; Jasny, Michael; Read, Andrew J

    2013-05-01

    Passed in 1972, the Marine Mammal Protection Act has two fundamental objectives: to maintain U.S. marine mammal stocks at their optimum sustainable populations and to uphold their ecological role in the ocean. The current status of many marine mammal populations is considerably better than in 1972. Take reduction plans have been largely successful in reducing direct fisheries bycatch, although they have not been prepared for all at-risk stocks, and fisheries continue to place marine mammals as risk. Information on population trends is unknown for most (71%) stocks; more stocks with known trends are improving than declining: 19% increasing, 5% stable, and 5% decreasing. Challenges remain, however, and the act has generally been ineffective in treating indirect impacts, such as noise, disease, and prey depletion. Existing conservation measures have not protected large whales from fisheries interactions or ship strikes in the northwestern Atlantic. Despite these limitations, marine mammals within the U.S. Exclusive Economic Zone appear to be faring better than those outside, with fewer species in at-risk categories and more of least concern. PMID:23521536

  7. Criteria for municipal-solid-waste landfills (40 CFR Part 258). Subtitle D of Resource Conservation and Recovery Act (RCRA). Location restrictions (Subpart B). Draft report

    SciTech Connect

    Not Available

    1988-07-01

    In August 1988, the U.S. Environmental Protection Agency proposed Solid-Waste Disposal Facilities Criteria (40 CFR Part 258) for municipal-solid-waste landfills. This background document provides the technical support for Subpart 'B' - Location Restrictions of Part 258. The document contains a discussion of the legislative and regulatory background for understanding the current status of Subtitle D. A discussion of other Federal laws, besides the Resource Conservation and Recovery Act (RCRA), that impact the siting of municipal-waste landfills also is presented. The document also presents detailed information on the revised location restrictions. The location restrictions include the following: airport safety; floodplains; wetlands; fault areas; seismic-impact areas; and unstable areas.

  8. Infrastructure to support learning health systems: are we there yet? Innovative solutions and lessons learned from American Recovery and Reinvestment Act CER investments.

    PubMed

    Holve, Erin; Segal, Courtney

    2014-11-01

    The 11 big health data networks participating in the AcademyHealth Electronic Data Methods Forum represent cutting-edge efforts to harness the power of big health data for research and quality improvement. This paper is a comparative case study based on site visits conducted with a subset of these large infrastructure grants funded through the Recovery Act, in which four key issues emerge that can inform the evolution of learning health systems, including the importance of acknowledging the challenges of scaling specialized expertise needed to manage and run CER networks; the delicate balance between privacy protections and the utility of distributed networks; emerging community engagement strategies; and the complexities of developing a robust business model for multi-use networks. PMID:25494570

  9. Resource Conservation and Recovery Act (RCRA) Part B permit application for tank storage units at the Oak Ridge Y-12 Plant

    SciTech Connect

    Not Available

    1994-05-01

    In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analyses and forms, inspection logs, equipment identification, etc.

  10. Characterization of MGP (manufactured gas plant) residues using proposed RCRA (Resource Conservation Recovery Act) tests. Topical report, May 1987-February 1989. Final report

    SciTech Connect

    Lew, L.R.; Gould, J.E.

    1989-03-01

    The U.S. Environment Protection Agency (EPA) has proposed two tests that may affect the regulation of residues associated with manufactured gas plant (MGP) sites which are not currently regulated by the Resource Conservation Recovery Act (RCRA): the Toxicity Characteristic Leaching Procedure (TCLP) and a revised reactivity test which includes interim guidance levels for reactive cyanide and sulfide as well as methods for determining reactive levels. Atlantic Environmental Services, Inc, carried out a research project under the Gas Research Institute program for the management of MGP sites. Several samples were tested using the proposed TCLP to determine the likelihood that MGP residues would be characterized as RCRA wastes under the new procedures. The reactivity tests for cyanide and sulfide also were run on samples collected from MGP sites to determine whether these specific residues would fall based on the revised technique. The results of the study are presented.

  11. Infrastructure to support learning health systems: are we there yet? Innovative solutions and lessons learned from American Recovery and Reinvestment Act CER investments.

    PubMed

    Holve, Erin; Segal, Courtney

    2014-11-01

    The 11 big health data networks participating in the AcademyHealth Electronic Data Methods Forum represent cutting-edge efforts to harness the power of big health data for research and quality improvement. This paper is a comparative case study based on site visits conducted with a subset of these large infrastructure grants funded through the Recovery Act, in which four key issues emerge that can inform the evolution of learning health systems, including the importance of acknowledging the challenges of scaling specialized expertise needed to manage and run CER networks; the delicate balance between privacy protections and the utility of distributed networks; emerging community engagement strategies; and the complexities of developing a robust business model for multi-use networks.

  12. 75 FR 76728 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-09

    ... Indicator in-home water meter monitors manufactured in Malaysia by Eastech, Inc., under license from Badger... Indicator in-home water meter monitors manufactured in Malaysia by Eastech, Inc., under license from Badger..., the purpose of the ARRA is to stimulate economic recovery by funding current...

  13. THE INTEGRATION OF THE 241-Z BUILDING DECONTAMINATION & DECOMMISSIONING (D&D) UNDER COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION & LIABILITY ACT (CERCLA) WITH RESOURCE CONSERVATION & RECOVERY ACT (RCRA) CLOSURE AT THE PLUTONIUM FINISHING PLANT (PFP)

    SciTech Connect

    HOPKINS, A.M.

    2007-02-20

    The 241-Z treatment and storage tanks, a hazardous waste Treatment, Storage and Disposal (TSD) unit permitted pursuant to the ''Resource Conservation and Recovery Act of 1976'' (RCRA) and Washington State ''Hazardous Waste Management Act, RCW 70.105'', have been deactivated and are being actively decommissioned. The 241-Z TSD unit managed non-listed radioactive contaminated waste water, containing trace RCRA characteristic constituents. The 241-Z TSD unit consists of below grade tanks (D-4, D-5, D-7, D-8, and an overflow tank) located in a concrete containment vault, sample glovebox GB-2-241-ZA, and associated ancillary piping and equipment. The tank system is located beneath the 241-Z building. The 241-Z building is not a portion of the TSD unit. The sample glovebox is housed in the above-grade building. Waste managed at the TSD unit was received via underground mining from Plutonium Finishing Plant (PFP) sources. Tank D-6, located in the D-6 vault cell, is a past-practice tank that was taken out of service in 1972 and has never operated as a portion of the RCRA TSD unit. CERCLA actions address Tank D-6, its containment vault cell, and soil beneath the cell that was potentially contaminated during past-practice operations and any other potential past-practice contamination identified during 241-Z closure, while outside the scope of the ''Hanford Facility Dangerous Waste Closure Plant, 241-Z Treatment and Storage Tanks''.

  14. Modernization of the Caltech/USGS Southern California Seismic Network - ARRA and Beyond

    NASA Astrophysics Data System (ADS)

    Thomas, V. I.; Bhadha, R.; Crummey, J.; Curtis, W.; Devora, A.; Flores, I.; Given, D. D.; Hauksson, E.; Johnson, D.; Koesterer, C.; Lydeen, S.; Sutton, D.; Watkins, M.; Yu, E.

    2011-12-01

    The USGS/ANSS/ARRA program provided equipment and funding to upgrade the equipment and infrastructure of the Caltech/USGS Southern California Seismic Network (SCSN). The SCSN is a modern digital seismic network that provides real-time earthquake information products such as rapid notifications, moment tensors, and ShakeMap. ARRA funds were used to modernize 178 of 300 SCSN stations, upgrade telemetry hubs, and build a state-of-the-art microwave telemetry backbone. With these upgrades complete, we are taking the next step of upgrading the analog short-period stations to digital short-period stations and adding strong motion sensors to them. We also are installing NetQuakes strong motion instruments to fill gaps in our urban recording capability. The ARRA-funded upgrades allow the SCSN to meet the ANSS Performance Standards more consistently than before. The new equipment makes the SCSN stations more homogeneous, significantly boosts station uptimes, reduces maintenance costs, and improves waveform data quality. The new data-loggers send data with reduced delays, which is critical for earthquake early warning applications. Station data quality was checked before each upgrade allowing sensor and site problems to be found, so that they could be addressed and data quality could be improved during the upgrade site visit. Data quality checks also were performed during the upgrade work and station metadata was changed in real time as work progressed. Sensor orientations were checked at over 115 sites using an OCTANS gyro-compass and mis-orientations were documented and corrected. To further take advantage of the ARRA-supplied equipment, we have developed scripts to take advantage of features from the new Q330 data-loggers: automatic detection of out-of-range mass positions with automatic recentering, and automatic data requests to fill data gaps. We also expanded the features and extended the utility of our Station Information System (SIS).

  15. School Improvement Grants: Selected States Generally Awarded Funds Only to Eligible Schools. American Recovery and Reinvestment Act of 2009. Final Audit Report. ED-OIG/A05L0002

    ERIC Educational Resources Information Center

    US Department of Education, 2012

    2012-01-01

    This final audit report covers the results of the review of five State educational agencies' monitoring plans and awarding processes for American Recovery and Reinvestment Act of 2009 and regular School Improvement Grants funds that the State educational agencies awarded for fiscal year 2009 (for use during school year 2010-2011). The objectives…

  16. Annual report on performance audit results for POHC (Principal Organic Hazardous Constituents) testing during RCRA (Resource Conservation and Recovery Act) trial burns. Status report No. 2

    SciTech Connect

    Jayanty, R.K.M.; Tompkins, S.B.; Bryant, V.R.; Howe, G.B.

    1989-12-01

    Audit materials containing Principal Organic Hazardous Constituents (POHSc) have been developed by AREAL for use by federal, state, and local agencies or their contractors to assess the accuracy of measurement methods during Resource Conservation and Recovery Act (RCRA) trial burn tests. Audit materials are currently available for 27 gaseous organics in 5, 6, 7, and 9 component mixtures at parts-per-billion levels (7 to 10,000 ppb) in compressed gas cylinders in a balance gas of nitrogen. The criteria used for the selection of gaseous organic compounds is described. Stability studies indicate that all of the organics tested (with the exception of ethylene oxide and propylene oxide below 10 ppb levels) are stable enough to be used as reliable audit materials. Subsequent to completion of the stability studies, 202 performance audits have been initiated with the audit materials to assess the accuracy of the Volatile Organic Sampling Training and bag measurement methods during or prior to RCRA trial burn tests. Results of those audits and a summary table of the audit conducted for each POHC and the measurement system audited is described in the report. Audit results obtained with the audit bases during or prior to RCRA trial burn tests are generally within + or - 50% of the audit concentrations.

  17. RCRA (Resource Conservation and Recovery Act of 1976) ground-water monitoring projects for Hanford facilities: Progress report, October 1--December 31, 1988: Volume 1, Text

    SciTech Connect

    Fruland, R.M.; Bates, D.J.; Lundgren, R.E.

    1989-04-01

    This report describes the progress of 13 Hanford ground-water monitoring projects for the period October 1 to December 31, 1988. There are 16 individual hazardous waste facilities covered by the 13 ground-water monitoring projects. The Grout Treatment Facility is included in this series of quarterly reports for the first time. The 13 projects discussed in this report were designed according to applicable interim-status ground-water monitoring requirements specified in the Resource Conservation and Recovery Act of 1976 (RCRA). During this quarter, field activities primarily consisted of sampling and analyses, and water-level monitoring. The 200 Areas Low-Level Burial Grounds section includes sediment analyses in addition to ground-water monitoring results. Twelve new wells were installed during the previous quarter: two at the 216-A-29 Ditch, six at the 216-A-10 Crib, and four at the 216-B-3 Pond. Preliminary characterization data for these new wells include drillers' logs and other drilling and site characterization data, and are provided in Volume 2 or on microfiche in the back of Volume 1. 26 refs., 28 figs., 74 tabs.

  18. 75 FR 82389 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... Reinvestment Act of 2009 (ARRA) to the Buffalo Island Regional Water District, Monette, AR AGENCY... reasonably available quantities and of a satisfactory quality] to the Buffalo Island Regional Water District... water supply well. The 15 HP vertical hollow shaft electric motor is manufactured by...

  19. 75 FR 8347 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... Reinvestment Act of 2009 (ARRA) to Mecklenburg County, NC, Land Use and Environmental Services Agency AGENCY... Land Use and Environmental Services Agency, for the purchase of coconut fiber (coir) woven mats. This... implemented by the Mecklenburg County Land Use and Environmental Services Agency that may otherwise...

  20. 75 FR 6202 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... proposes to construct a ``Long Term Control Plan Store-Treat Facility Project'' at the Auburn Water... to Cedar Creek. After the rain event, the excess sewer flow will be treated at the Water Pollution... Reinvestment Act of 2009 (ARRA) to the Auburn, Indiana Department of Water Pollution Control (Auburn)...

  1. 76 FR 18218 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... Reinvestment Act of 2009 (ARRA) to Salt Lake City, UT AGENCY: Environmental Protection Agency (EPA). ACTION... satisfactory quality to Salt Lake City, UT for three vertical linear motion mixers to be installed in the City... review and recommendation of EPA Region 8's Technical & Financial Services Unit. Salt Lake City...

  2. 75 FR 25246 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... contamination of scarce water supplies that have already been treated to comply with National Primary Drinking... Reinvestment Act of 2009 (ARRA) to the Albuquerque Bernalillo County Water Utility Authority, New Mexico AGENCY... reasonably available quantities and of a satisfactory quality] to the Albuquerque Bernalillo County...

  3. 75 FR 66373 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ... Cryptosporidium and Giardia from drinking water. After an engineering analysis of alternate treatment processes... Reinvestment Act of 2009 (ARRA) to the Newport Borough Water Authority, Pennsylvania AGENCY: Environmental... available quantities and of a satisfactory quality] to the Newport Borough Water Authority (NBWA) for...

  4. Disaster Recovery Act of 2011

    THOMAS, 112th Congress

    Sen. Landrieu, Mary L. [D-LA

    2011-09-23

    09/23/2011 Read twice and referred to the Committee on Homeland Security and Governmental Affairs. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  5. 75 FR 48974 - Notice of Intent To Award Patient Protection and Affordable Care Act Funding to Approved But...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ...; The amount of the sub-award; The transaction type; The North American Industry Classification System..., for programs authorized by the Public Health Services Act, for prevention, wellness and public health... and Wellness Program as embodied in CDC RFA DP09-912ARRA09. Dated: August 5, 2010. Tanja...

  6. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, For Fiscal Year 2010

    SciTech Connect

    NSTec Environmental Management

    2011-01-26

    This report serves as the combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): (1) CAU 90, Area 2 Bitcutter Containment; (2) CAU 91, Area 3 U-3fi Injection Well; (3) CAU 92, Area 6 Decon Pond Facility; (4) CAU 110, Area 3 WMD U-3ax/bl Crater; and (5) CAU 112, Area 23 Hazardous Waste Trenches. The locations of the sites are shown in Figure 1. This report covers fiscal year 2010 (October 2009-September 2010). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0021 and summarized in each CAU-specific section in Section 1.0 of this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly at CAUs 92, 110, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches in a 24-hour period. Inspections include an evaluation of the condition of the units and identification of any deficiencies that may compromise the integrity of the units. The condition of covers, fencing, signs, gates, and locks is documented. In addition, soil moisture monitoring and subsidence surveys are conducted at CAU 110. The results of the inspections, summary of maintenance activities, results of vegetations surveys, and analysis of monitoring data are presented in this report. Copies of the inspection checklists are included as Appendix A. Field notes completed during each inspection are included in Appendix B. Photographs taken during the site inspections are included in Appendix C.

  7. Environmental Restoration of Corrective Action Unit 408: Bomblet Target Area, Tonopah Test Range, Nevada (Funded by the American Reinvestment and Recovery Act)

    SciTech Connect

    Kevin Cabble , Mark Burmeister and Mark Krauss

    2011-03-03

    The mission of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Environmental Restoration Program is to address the environmental impacts of weapons testing conducted on the Nevada National Security Site and the Nevada Test and Training Range. The large physical size of these sites, along with limits on funding and other resources available for remediation efforts, means that environmental restoration activities must be prioritized and accomplished incrementally over time. The remediation of a bomblet target area on the Tonopah Test Range (TTR), which is located within the Nevada Test and Training Range, was originally planned in 2007 but was not carried out until funding became available in the summer of 2009 through the American Reinvestment and Recovery Act. This activity was implemented in accordance with the Federal Facility Agreement and Consent Order established between NNSA/NSO and the Nevada Division of Environmental Protection. This activity which was complete by the end of Fiscal Year 2010, involved the excavation of disposal pits suspected of containing submunitions and the surface clearance of submunitions on seven target areas amounting to approximately 6.7 square kilometers of land at the TTR. The TTR was used by Sandia National Laboratories from the late 1960s through the mid-1980s to conduct research into the deployment of submunitions. Although there were efforts to identify, collect, and dispose various amounts of unexploded ordnance on the TTR in the past, no comprehensive effort to remediate the entire flightline area for submunitions was undertaken before this project.

  8. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada Test Site, Nevada, for Fiscal Year 2009

    SciTech Connect

    NSTec Environmental Restoration

    2010-01-31

    This report serves as the combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): · CAU 90, Area 2 Bitcutter Containment · CAU 91, Area 3 U-3fi Injection Well · CAU 92, Area 6 Decon Pond Facility · CAU 110, Area 3 WMD U-3ax/bl Crater · CAU 112, Area 23 Hazardous Waste Trenches This report covers fiscal year 2009 (October 2008–September 2009). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0021 and summarized in each CAU-specific section in Section 1.0 of this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly at CAUs 92, 110, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches in a 24-hour period. Inspections include an evaluation of the condition of the units and identification of any deficiencies that may compromise the integrity of the units. The condition of covers, fencing, signs, gates, and locks is documented. In addition, soil moisture monitoring and subsidence surveys are conducted at CAU 110. The results of the inspections, summary of maintenance activities, results of vegetations surveys, and analysis of monitoring data are presented in this report. Copies of the inspection checklists are included as Appendix A. Field notes completed during each inspection are included in Appendix B. Photographs taken during the site inspections are included in Appendix C.

  9. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, for Fiscal Year 2014

    SciTech Connect

    Silvas, Alissa J.

    2015-01-01

    This report serves as the combined annual report for post-closure activities for several Corrective Action Units (CAUs). The locations of the sites are shown in Figure 1. This report covers fiscal year 2014 (October 2013–September 2014). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly at CAUs 92, 110, 111, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches (in.) in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 in. in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. In addition to visual inspections, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted at CAU 110. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. The results of the vegetation surveys and an analysis of the soil moisture monitoring data at CAU 110 are presented in this report. Results of additional monitoring at CAU 111 are documented annually in the Nevada National Security Site Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites and in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site, which will be prepared in approximately June 2015. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. It is recommended to continue

  10. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada Test Site, Nevada, For Fiscal Year 2008 (October 2007-September 2008)

    SciTech Connect

    NSTec Environmental Restoration

    2008-12-23

    This report is the first combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): • CAU 90, Area 2 Bitcutter Containment • CAU 91, Area 3 U-3fi Injection Well • CAU 92, Area 6 Decon Pond Facility • CAU 110, Area 3 WMD U-3ax/bl Crater • CAU 112, Area 23 Hazardous Waste Trenches The locations of the sites are shown in Figure 1. This report covers fiscal year (FY) 2008 (October 2007–September 2008). Because this is the first combined annual report for these CAUs, this report only covers the period not covered in the previous annual report for each CAU. For example, the last report submitted for CAU 91 covered the period January 2007–December 2007; therefore, this report only covers the remainder of FY2008 (January 2008–September 2008) for CAU 91. The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0021 and summarized in each CAU-specific section in Section 1.0 of this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly at CAUs 92, 110, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches in a 24-hour period. Inspections include an evaluation of the condition of the units and identification of any deficiencies that may compromise the integrity of the units. The condition of covers, fencing, signs, gates, and locks is documented. In addition, soil moisture monitoring and subsidence surveys are conducted at CAU 110. The results of the inspections, summary of maintenance activities, results of vegetations surveys, and analysis of monitoring data are presented in this report. Copies of the inspection checklists are included as Appendix A. Field notes completed during each inspection are included in Appendix B. Photographs taken during the site inspections are included in Appendix C.

  11. Recovery Act: Oxy-Combustion Technology Development for Industrial-Scale Boiler Applications. Task 4 - Testing in Alstom's 15 MWth Boiler Simulation Facility

    SciTech Connect

    Levasseur, Armand

    2014-04-30

    Alstom Power Inc. (Alstom), under U.S. DOE/NETL Cooperative Agreement No. DE-NT0005290, is conducting a development program to generate detailed technical information needed for application of oxy-combustion technology. The program is designed to provide the necessary information and understanding for the next step of large-scale commercial demonstration of oxy combustion in tangentially fired boilers and to accelerate the commercialization of this technology. The main project objectives include: Design and develop an innovative oxyfuel system for existing tangentially-fired boiler units that minimizes overall capital investment and operating costs; Evaluate performance of oxyfuel tangentially fired boiler systems in pilot scale tests at Alstom’s 15 MWth tangentially fired Boiler Simulation Facility (BSF); Address technical gaps for the design of oxyfuel commercial utility boilers by focused testing and improvement of engineering and simulation tools; Develop the design, performance and costs for a demonstration scale oxyfuel boiler and auxiliary systems; Develop the design and costs for both industrial and utility commercial scale reference oxyfuel boilers and auxiliary systems that are optimized for overall plant performance and cost; and, Define key design considerations and develop general guidelines for application of results to utility and different industrial applications. The project was initiated in October 2008 and the scope extended in 2010 under an ARRA award. The project is scheduled for completion by April 30, 2014. Central to the project is 15 MWth testing in the BSF, which provided in-depth understanding of oxy-combustion under boiler conditions, detailed data for improvement of design tools, and key information for application to commercial scale oxy-fired boiler design. Eight comprehensive 15 MWth oxy-fired test campaigns were performed with different coals, providing detailed data on combustion, emissions, and thermal behavior over a matrix of

  12. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada for Fiscal Year 2011 (October 2010-September 2011)

    SciTech Connect

    NSTec Environmental Restoration

    2012-01-18

    This report serves as the combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): (1) CAU 90, Area 2 Bitcutter Containment; (2) CAU 91, Area 3 U-3fi Injection Well; (3) CAU 92, Area 6 Decon Pond Facility; (4) CAU 110, Area 3 WMD U-3ax/bl Crater; and (5) CAU 112, Area 23 Hazardous Waste Trenches. This report covers fiscal year 2011 (October 2010-September 2011). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly at CAUs 92, 110, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches in a 24-hour period. Inspections include an evaluation of the condition of the units and identification of any deficiencies that may compromise the integrity of the units. The condition of covers, fencing, signs, gates, and locks is documented. In addition, soil moisture monitoring and subsidence surveys are conducted at CAU 110. The results of the inspections, summary of maintenance activities, results of vegetations surveys, and analysis of monitoring data are presented in this report. Copies of the inspection checklists are included as Appendix A. Field notes completed during each inspection are included in Appendix B. Photographs taken during the inspections are included in Appendix C. It is recommended to continue semiannual inspections at CAUs 90 and 91; quarterly inspections at CAUs 92, 110, and 112; and additional inspections at CAU 92 if precipitation occurs in excess of 0.50 inches in a 24-hour period. At CAU 92, it is recommended to remove the wave barriers, as they have not proven to be necessary to protect the cover. At CAU 110, it is recommended to continue annual vegetation monitoring and soil moisture monitoring, and to reduce the frequency of

  13. 75 FR 16149 - Notice Of Amendment-OS ARRA Expansion of Research Capabilities To Study CE Complex Patients (R24...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Agency for Healthcare Research and Quality Notice Of Amendment--OS ARRA Expansion of Research Capabilities To Study CE Complex Patients (R24) SEP Meeting With this correction notice,...

  14. 26 CFR 301.9100-4T - Time and manner of making certain elections under the Economic Recovery Tax Act of 1981.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) Different recovery period Property placed in service after 1980. 201(a) 168(d)(2)(A) Inclusion in income of entire proceeds of disposition Property placed in service after 1980. 201(a) 168(e)(2) Exclusion...

  15. RECOVERY ACT: DYNAMIC ENERGY CONSUMPTION MANAGEMENT OF ROUTING TELECOM AND DATA CENTERS THROUGH REAL-TIME OPTIMAL CONTROL (RTOC): Final Scientific/Technical Report

    SciTech Connect

    Ron Moon

    2011-06-30

    This final scientific report documents the Industrial Technology Program (ITP) Stage 2 Concept Development effort on Data Center Energy Reduction and Management Through Real-Time Optimal Control (RTOC). Society is becoming increasingly dependent on information technology systems, driving exponential growth in demand for data center processing and an insatiable appetite for energy. David Raths noted, 'A 50,000-square-foot data center uses approximately 4 megawatts of power, or the equivalent of 57 barrels of oil a day1.' The problem has become so severe that in some cases, users are giving up raw performance for a better balance between performance and energy efficiency. Historically, power systems for data centers were crudely sized to meet maximum demand. Since many servers operate at 60%-90% of maximum power while only utilizing an average of 5% to 15% of their capability, there are huge inefficiencies in the consumption and delivery of power in these data centers. The goal of the 'Recovery Act: Decreasing Data Center Energy Use through Network and Infrastructure Control' is to develop a state of the art approach for autonomously and intelligently reducing and managing data center power through real-time optimal control. Advances in microelectronics and software are enabling the opportunity to realize significant data center power savings through the implementation of autonomous power management control algorithms. The first step to realizing these savings was addressed in this study through the successful creation of a flexible and scalable mathematical model (equation) for data center behavior and the formulation of an acceptable low technical risk market introduction strategy leveraging commercial hardware and software familiar to the data center market. Follow-on Stage 3 Concept Development efforts include predictive modeling and simulation of algorithm performance, prototype demonstrations with representative data center equipment to verify requisite

  16. Use of Artificial Propagation and Supplementation for Rebuilding Salmon Stocks Listed under the Endangered Species Act : Recovery Issues for Threatened and Endangered Snake River Salmon : Technical Report 5 of 11.

    SciTech Connect

    Lichatowich, Jim; Watson, Bruce

    1993-06-01

    Conventional hatcheries, supplementation, and habitat protection are management activities located on a production continuum. At one end of the continuum is the conventional hatchery which attempts to separate artificially propagated fish from naturally reproducing populations. On the other end of the continuum is natural production. Supplementation which attempts to increase natural production through the use of artificial propagation lies somewhere between natural production and conventional hatcheries on the continuum. The use of artificial propagation in the recovery of listed species is controversial. Guidance on the use of artificial propagation in the recovery of listed species comes from three sources: The Endangered Species Act (ESA), US Fish and Wildlife Service (USFWS) policies and National Marine Fisheries Service (NMFS) guidelines.

  17. Resource Conservation and Recovery Act (RCRA) Part B Permit Application for Production Associated Units at the Oak Ridge Y-12 Plant

    SciTech Connect

    Not Available

    1994-09-01

    This is the RCRA required permit application for Radioactive and Hazardous Waste Management at the Oak Ridge Y-12 Plant for the following units: Building 9206 Container Storage Unit; Building 9212 Container Storage Unit; Building 9720-12 Container Storage Unit; Cyanide Treatment Unit. All four of these units are associated with the recovery of enriched uranium and other metals from wastes generated during the processing of nuclear materials.

  18. Update on the Federal Stimulus Package and Funding to Higher Education. Report 09-19

    ERIC Educational Resources Information Center

    Jones, Jessika

    2009-01-01

    On February 17, 2009, President Obama signed into law the American Recovery and Reinvestment Act of 2009 (ARRA). The Act commits $100 billion to education, with $8.5 billion allocated to California. Education programs to receive funding through ARRA include Local Education Agency Title I Grants, Educational Technology Grants, IDEA Grants, Federal…

  19. 76 FR 14439 - No FEAR Act Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... TRANSPARENCY BOARD No FEAR Act Notice AGENCY: Recovery Accountability and Transparency Board. ACTION: Notice... and Retaliation Act (No FEAR Act or Act), as implemented by Office of Personnel Management (OPM... No FEAR Act. See Public Law 107-174, codified at 5 U.S.C. 2301 note. One purpose of the Act is...

  20. Reading Recovery.

    ERIC Educational Resources Information Center

    Jones, Joanna R., Ed.

    1992-01-01

    This issue of the Arizona Reading Journal focuses on the theme "reading recovery" and includes the following articles: "Why Is an Inservice Programme for Reading Recovery Teachers Necessary?" (Marie M. Clay); "What Is Reading Recovery?" (Gay Su Pinnell); "Teaching a Hard To Teach Child" (Constance A. Compton); "Reading Recovery in Arizona--A…

  1. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Chapter E, Appendix E1, Chapter L, Appendix L1: Volume 12, Revision 3

    SciTech Connect

    Not Available

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP) Project was authorized by the US Department of Energy 5 (DOE) National Security and Military Applications of the Nuclear Energy Authorization Act of 1980 (Public Law 96-164). Its legislative mandate is to provide a research and development facility to demonstrate the safe disposal of radioactive waste resulting from national defense programs and activities. To fulfill this mandate, the WIPP facility has been designed to perform scientific investigations of the behavior of bedded salt as a repository medium and the interactions between the soft and radioactive wastes. In 1991, DOE proposed to initiate a experimental Test Phase designed to demonstrate the performance of the repository. The Test Phase activities involve experiments using transuranic (TRU) waste typical of the waste planned for future disposal at the WIPP facility. Much of this TRU waste is co-contaminated with chemical constituents which are defined as hazardous under HWMR-7, Pt. II, sec. 261. This waste is TRU mixed waste and is the subject of this application. Because geologic repositories, such as the WIPP facility, are defined under the Resource Conservation and Recovery Act (RCRA) as land disposal facilities, the groundwater monitoring requirements of HWMR-7, PLV, Subpart X, must be addressed. HWMR-7, Pt. V, Subpart X, must be addressed. This appendix demonstrates that groundwater monitoring is not needed in order to demonstrate compliance with the performance standards; therefore, HWMR-7, Pt.V, Subpart F, will not apply to the WIPP facility.

  2. FANC Pathway Promotes UV-Induced Stalled Replication Forks Recovery by Acting Both Upstream and Downstream Polη and Rev1

    PubMed Central

    Renaud, Emilie; Rosselli, Filippo

    2013-01-01

    To cope with ultraviolet C (UVC)-stalled replication forks and restart DNA synthesis, cells either undergo DNA translesion synthesis (TLS) by specialised DNA polymerases or tolerate the lesions using homologous recombination (HR)-based mechanisms. To gain insight into how cells manage UVC-induced stalled replication forks, we analysed the molecular crosstalk between the TLS DNA polymerases Polη and Rev1, the double-strand break repair (DSB)-associated protein MDC1 and the FANC pathway. We describe three novel functional interactions that occur in response to UVC-induced DNA lesions. First, Polη and Rev1, whose optimal expression and/or relocalisation depend on the FANC core complex, act upstream of FANCD2 and are required for the proper relocalisation of monoubiquitinylated FANCD2 (Ub-FANCD2) to subnuclear foci. Second, during S-phase, Ub-FANCD2 and MDC1 relocalise to UVC-damaged nuclear areas or foci simultaneously but independently of each other. Third, Ub-FANCD2 and MDC1 are independently required for optimal BRCA1 relocalisation. While RPA32 phosphorylation (p-RPA32) and RPA foci formation were reduced in parallel with increasing levels of H2AX phosphorylation and MDC1 foci in UVC-irradiated FANC pathway-depleted cells, MDC1 depletion was associated with increased UVC-induced Ub-FANCD2 and FANCD2 foci as well as p-RPA32 levels and p-RPA32 foci. On the basis of the previous observations, we propose that the FANC pathway participates in the rescue of UVC-stalled replication forks in association with TLS by maintaining the integrity of ssDNA regions and by preserving genome stability and preventing the formation of DSBs, the resolution of which would require the intervention of MDC1. PMID:23365640

  3. FANC pathway promotes UV-induced stalled replication forks recovery by acting both upstream and downstream Polη and Rev1.

    PubMed

    Renaud, Emilie; Rosselli, Filippo

    2013-01-01

    To cope with ultraviolet C (UVC)-stalled replication forks and restart DNA synthesis, cells either undergo DNA translesion synthesis (TLS) by specialised DNA polymerases or tolerate the lesions using homologous recombination (HR)-based mechanisms. To gain insight into how cells manage UVC-induced stalled replication forks, we analysed the molecular crosstalk between the TLS DNA polymerases Polη and Rev1, the double-strand break repair (DSB)-associated protein MDC1 and the FANC pathway. We describe three novel functional interactions that occur in response to UVC-induced DNA lesions. First, Polη and Rev1, whose optimal expression and/or relocalisation depend on the FANC core complex, act upstream of FANCD2 and are required for the proper relocalisation of monoubiquitinylated FANCD2 (Ub-FANCD2) to subnuclear foci. Second, during S-phase, Ub-FANCD2 and MDC1 relocalise to UVC-damaged nuclear areas or foci simultaneously but independently of each other. Third, Ub-FANCD2 and MDC1 are independently required for optimal BRCA1 relocalisation. While RPA32 phosphorylation (p-RPA32) and RPA foci formation were reduced in parallel with increasing levels of H2AX phosphorylation and MDC1 foci in UVC-irradiated FANC pathway-depleted cells, MDC1 depletion was associated with increased UVC-induced Ub-FANCD2 and FANCD2 foci as well as p-RPA32 levels and p-RPA32 foci. On the basis of the previous observations, we propose that the FANC pathway participates in the rescue of UVC-stalled replication forks in association with TLS by maintaining the integrity of ssDNA regions and by preserving genome stability and preventing the formation of DSBs, the resolution of which would require the intervention of MDC1.

  4. 75 FR 68841 - Agenda and Notice of Partially Closed Meeting of the Recovery Independent Advisory Panel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-09

    ... From the Federal Register Online via the Government Publishing Office RECOVERY ACCOUNTABILITY AND... AGENCY: Recovery Accountability and Transparency Board. ACTION: Notice of partially closed meeting... Act), and the Federal Advisory Committee Act of 1972 (FACA), the Recovery Accountability...

  5. 75 FR 42172 - Agenda and Notice of Partially Closed Meeting of the Recovery Independent Advisory Panel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-20

    ... From the Federal Register Online via the Government Publishing Office RECOVERY ACCOUNTABILITY AND... AGENCY: Recovery Accountability and Transparency Board. ACTION: Notice of partially closed meeting... Act), and the Federal Advisory Committee Act of 1972 (FACA), the Recovery Accountability...

  6. 77 FR 22001 - Proposed Collection of Follow-up Survey Information for Green Jobs and Health Care Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-12

    ... Health Care Impact Evaluation of American Recovery and Reinvestment Act (ARRA)-Funded Grants; New... of the Green Jobs and Health Care ARRA-funded training grants. This evaluation is sponsored by ETA to... impacts of the Green Jobs and Health Care (GJHC) training grants. This evaluation is sponsored by ETA...

  7. Toothless Reform?

    ERIC Educational Resources Information Center

    Smarick, Andy

    2010-01-01

    To many education reformers, the passage of the federal government's massive stimulus plan, the American Recovery and Reinvestment Act (ARRA), appeared to be a final bright star falling into alignment. The ARRA seemed to complete the constellation: an astounding $100 billion of new federal funds--nearly twice the annual budget of the U.S.…

  8. Race to the Top Program: Executive Summary

    ERIC Educational Resources Information Center

    US Department of Education, 2009

    2009-01-01

    On February 17, 2009, President Obama signed into law the American Recovery and Reinvestment Act of 2009 (ARRA), historic legislation designed to stimulate the economy, support job creation, and invest in critical sectors, including education. The ARRA lays the foundation for education reform by supporting investments in innovative strategies that…

  9. Case Studies of Schools Receiving School Improvement Grants. Final Report. NCEE 2016-4002

    ERIC Educational Resources Information Center

    Le Floch, Kerstin Carlson; O'Day, Jennifer; Birman, Beatrice; Hurlburt, Steven; Nayfack, Michelle; Halloran, Clare; Boyle, Andrea; Brown, Seth; Mercado-Garcia, Diana; Goff, Rose; Rosenberg, Linda; Hulsey, Lara

    2016-01-01

    The Study of School Turnaround (SST) examines the change process in a diverse, purposive sample of schools receiving federal School Improvement Grants (SIG) from 2010-11 to 2012-13. With the passage of the American Recovery and Reinvestment Act of 2009 (ARRA), the SIG program underwent three major shifts. First, ARRA boosted total SIG funding in…

  10. [Opportunities and Obstacles: Implementing Stimulus-Funded School Improvement Grants in Maryland, Michigan, and Idaho. Maryland Case Study

    ERIC Educational Resources Information Center

    McMurrer, Jennifer; McIntosh, Shelby

    2012-01-01

    Two schools in Maryland received ARRA SIG (American Recovery and Reinvestment Act School Improvement Grants) funds to enable them to implement their turnaround efforts. This paper describes the outcomes of these two ARRA SIG recipient schools: (1) G. James Gholson Middle School; and (2) Commodore John Rodgers Elementary School. The experiences of…

  11. Opportunities and Obstacles: Implementing Stimulus-Funded School Improvement Grants in Maryland, Michigan, and Idaho

    ERIC Educational Resources Information Center

    Scott, Caitlin; McMurrer, Jennifer; McIntosh, Shelby; Dibner, Kenne

    2012-01-01

    State and local educators encountered both opportunities and obstacles in their first year of implementing the School Improvement Grants (SIGs) funded by the American Recovery and Reinvestment Act (ARRA). In 2009, the ARRA, better known as the economic stimulus package, provided $3 billion for SIGs to help reform persistently low-achieving…

  12. [Opportunities and Obstacles: Implementing Stimulus-Funded School Improvement Grants in Maryland, Michigan, and Idaho. Michigan Case Study

    ERIC Educational Resources Information Center

    Scott, Caitlin; Dibner, Kenne

    2012-01-01

    Two schools in Michigan received ARRA SIG (American Recovery and Reinvestment Act School Improvement Grants) funds to enable them to implement their improvement efforts. This paper describes the outcomes of these two ARRA SIG recipient schools: (1) Phoenix Elementary-Middle School; and (2) Arthur Hill High School. The experiences of these…

  13. [Opportunities and Obstacles: Implementing Stimulus-Funded School Improvement Grants in Maryland, Michigan, and Idaho. Idaho Case Study

    ERIC Educational Resources Information Center

    Scott, Caitlin; McMurrer, Jennifer; McIntosh, Shelby

    2012-01-01

    Two schools in Idaho received ARRA SIG (American Recovery and Reinvestment Act School Improvement Grants) funds to enable them to implement improvement efforts. This paper describes the outcomes of these two ARRA SIG recipient schools: (1) Jefferson Middle School; and (2) Lakeside Elementary School. The experiences of this non-recipient school is…

  14. Operational Authority, Support, and Monitoring of School Turnaround. NCEE Evaluation Brief. NCEE 2014-4008

    ERIC Educational Resources Information Center

    Herman, Rebecca; Graczewski, Cheryl; James-Burdumy, Susanne; Murray, Matthew; Perez-Johnson, Irma; Tanenbaum, Courtney

    2013-01-01

    The federal School Improvement Grants (SIG) program, to which $3 billion were allocated under the American Recovery and Reinvestment Act of 2009 (ARRA), supports schools attempting to turn around a history of low performance. School turnaround also is a focus of Race to the Top (RTT), another ARRA-supported initiative, which involved a roughly $4…

  15. Conflicting Missions and Unclear Results: Lessons from the Education Stimulus Funds

    ERIC Educational Resources Information Center

    Mead, Sara; Vaishnav, Anand; Porter, William; Rotherham, Andrew J.

    2010-01-01

    On February 17, 2009, President Barack Obama signed into law the American Recovery and Reinvestment Act (ARRA), commonly known as the "stimulus." Enacted in the midst of a deep recession brought on by global financial collapse, ARRA provided more than $800 billion in federal spending and tax cuts intended to stimulate the economy while laying the…

  16. Public Expenditures on Children through 2008: Key Facts

    ERIC Educational Resources Information Center

    Macomber, Jennifer; Isaacs, Julia; Kent, Adam; Vericker, Tracy

    2010-01-01

    This report provides the key findings on the public spending on children through 2008. They are: (1) Spending on children increased under the American Recovery and Reinvestment Act (ARRA) and other stimulus spending, but not proportionately to other federal spending. As ARRA expires, we project that spending on children will decline, assuming no…

  17. 75 FR 78673 - Agency Information Collection Activities: Proposed Collection; Comment Request-Study To Assess...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF AGRICULTURE... Food Security in the Post- American Recovery and Reinvestment Act (ARRA) Environment AGENCY: Food and... (ARRA) Environment. DATES: Written comments must be received on or before February 14, 2011....

  18. $100 Billion: For Reform...or to Subsidize the Status Quo? Education Stimulus Watch. Special Report 1

    ERIC Educational Resources Information Center

    Smarick, Andy

    2009-01-01

    This is the first in a quarterly series of special reports on the K-12 education implications of the federal government's economic stimulus package, the American Recovery and Reinvestment Act (ARRA). That the ARRA, which was signed into law in February, will pump nearly $100 billion--an unprecedented sum of federal money--into K-12 education is…

  19. H.R. 4984: A Bill to amend the Solid Waste Disposal Act to regulate the use of hazardous waste as fuel for energy recovery, the operation of cement kilns that burn hazardous waste as fuel, the disposal of cement kiln dust waste, and related activities. Introduced in the House of Representatives, One Hundred Third Congress, Second Session, August 18, 1994

    SciTech Connect

    1994-12-31

    The report H.R. 4984 is a bill to amend the Solid Waste Disposal Act to regulate the use of hazardous waste as fuel for energy recovery, the operation of cement kilns that burn hazardous waste as fuel, the disposal of cement kiln dust waste. The proposed legislative text is provided.

  20. 78 FR 7784 - Health Information Technology Policy Committee Nomination Letters

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... OFFICE Health Information Technology Policy Committee Nomination Letters AGENCY: Government... Recovery and Reinvestment Act of 2009 (ARRA) established the Health Information Technology Policy Committee (Health IT Policy Committee) and gave the Comptroller General responsibility for appointing 13 of its...

  1. 76 FR 5356 - Notice of Submission for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-31

    ...: Integrated Evaluation of American Recovery and Reinvestment Act (ARRA) Funding, Implementation and Outcomes... Public: State, Local, or Tribal Government, State Educational Agencies or Local Educational Agencies..., and ] increased productivity and effectiveness. This evaluation will focus on answering four sets...

  2. Recovery Act: Geologic Sequestration Training and Research

    SciTech Connect

    Walsh, Peter; Esposito, Richard; Theodorou, Konstantinos; Hannon, Michael; Lamplugh, Aaron; Ellison, Kirk

    2013-06-30

    Work under the project entitled "Geologic Sequestration Training and Research," was performed by the University of Alabama at Birmingham and Southern Company from December 1, 2009, to June 30, 2013. The emphasis was on training of students and faculty through research on topics central to further development, demonstration, and commercialization of carbon capture, utilization, and storage (CCUS). The project had the following components: (1) establishment of a laboratory for measurement of rock properties, (2) evaluation of the sealing capacity of caprocks, (3) evaluation of porosity, permeability, and storage capacity of reservoirs, (4) simulation of CO{sub 2} migration and trapping in storage reservoirs and seepage through seal layers, (5) education and training of students through independent research on rock properties and reservoir simulation, and (6) development of an advanced undergraduate/graduate level course on coal combustion and gasification, climate change, and carbon sequestration. Four graduate students and one undergraduate student participated in the project. Two were awarded Ph.D. degrees for their work, the first in December 2010 and the second in August 2013. A third graduate student has proposed research on an advanced technique for measurement of porosity and permeability, and has been admitted to candidacy for the Ph.D. The fourth graduate student is preparing his proposal for research on CCUS and solid waste management. The undergraduate student performed experimental measurements on caprock and reservoir rock samples and received his B.S.M.E. degree in May 2012. The "Caprock Integrity Laboratory," established with support from the present project, is fully functional and equipped for measurement of porosity, permeability, minimum capillary displacement pressure, and effective permeability to gas in the presence of wetting phases. Measurements are made at ambient temperature and under reservoir conditions, including supercritical CO{sub 2}. During the course of the project, properties of 19 samples provided by partners on companion projects supported by NETL were measured, covering a range of permeabilities from 0.28 ndarcy to 81 mdarcy. Reservoir simulations were performed for injection of 530,000 tonnes of CO{sub 2} through a single well into the Middle Donovan formation in Citronelle Dome, in southwest Alabama, over 40 years, followed by migration and trapping for 10,000 years, using the TOUGH2 and TOUGHREACT software packages from Lawrence Berkeley National Laboratory. It was estimated that 50 kg CO{sub 2}/m{sup 3} of formation would be converted to mineral phases within the CO{sub 2} plume during that time. None of the sand units considered for CO{sub 2} storage in Citronelle Dome have thickness exceeding the estimated critical CO{sub 2} column height (Berg, 1975) at which seepage might begin, through their confining shale layers. A model for leakage through caprock, based on work by Hildenbrand et al. (2004), including a functional relationship between capillary pressure and the effective permeability to gas in the presence of a wetting phase, demonstrated the sensitivity of long-term storage to caprock permeability and thickness. A traditional course on coal combustion was augmented with material on climate change, coal gasification, and carbon sequestration. A total of 49 students completed the course during two offerings, in Fall 2010 and Fall 2012. It has become a popular advanced elective course in the Department of Mechanical Engineering.

  3. American Recovery and Reinvestment Act of 2009

    THOMAS, 111th Congress

    Sen. Baucus, Max [D-MT

    2009-01-29

    01/30/2009 Star Print ordered on the bill. (All Actions) Notes: For further action, see H.R.1, which became Public Law 111-5 on 2/17/2009. Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  4. Energy and Commerce Recovery and Reinvestment Act

    THOMAS, 111th Congress

    Rep. Waxman, Henry A. [D-CA-30

    2009-01-22

    01/27/2009 Placed on the Union Calendar, Calendar No. 3. (All Actions) Notes: For further action, see H.R.1, which became Public Law 111-5 on 2/17/2009. Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  5. Good Samaritan Search and Recovery Act

    THOMAS, 113th Congress

    Rep. Heck, Joseph J. [R-NV-3

    2013-05-23

    07/30/2014 Committee on Energy and Natural Resources Subcommittee on Public Lands, Forests, and Mining. Hearings held. (All Actions) Tracker: This bill has the status Passed HouseHere are the steps for Status of Legislation:

  6. Recovery Act : Heterogeneous Feed Biorefinery Project

    SciTech Connect

    Schofield, Richard

    2015-03-15

    To overcome the hurdles associated with introducing a new technology, Enerkem applied to the US DOE for grant assistance with its Pontotoc, Mississippi, biorefinery under the DOE’s Demonstration of Integrated Biorefinery Operations FOA. Consistent with Enerkem’s strategic approach, the project proposed uses post sorted municipal solid waste blended with other forest residue. The proposed biorefinery is to be located within the boundaries of a working landfill, thus simplifying many aspects of environmental permitting while also reducing feedstock acquisition and transportation costs. An economic impact analysis was conducted using an adaptation of the US Department of Energy’s JEDI (Jobs and Economic Development Impact) model for an ethanol-producing biorefinery. The JEDI model, which does not have a thermochemical processing option, had to be configured to reflect a biomass feedstock and was thus adapted by Enerkem to account for the unique feedstock requirements and operations of the Project. According to this model, development, construction, and 2 years of operation of the biorefinery require an investment of approximately $140 million. Also, a construction period of 18 months will create significant direct and indirect employment. Indirect employment includes steel manufacturers, construction materials manufacturers, material shipping, equipment manufacturers and fabrication, etc. During the construction phase of the Project, 210 total jobs are expected to be created, including 145 direct jobs and 72 indirect or induced jobs. During the operating period, 131 jobs would be created, 95 of which are direct. It is anticipated that the project will create at least 10 new jobs (included in the above figures and in addition to the JEDI data) in the sorting and recycling sector, since the project will require operations in sorting MSW since valuable ferrous, nonferrous and recyclable plastic materials will be sorted from MSW as part of the process that isolates MSW-derived biomass.

  7. Sandy Recovery Improvement Act of 2013

    THOMAS, 113th Congress

    Rep. Denham, Jeff [R-CA-10

    2013-01-14

    12/20/2013 Indefinitely postponed by Senate by Unanimous Consent. (consideration: CR S9115) (All Actions) Notes: For further action, see H.R.152, which became Public Law 113-2 on 1/29/2013. Tracker: This bill has the status Passed HouseHere are the steps for Status of Legislation:

  8. Holocaust Expropriated Art Recovery Act of 2016

    THOMAS, 112th Congress

    Sen. Cornyn, John [R-TX

    2016-04-07

    09/15/2016 Committee on the Judiciary. Ordered to be reported with an amendment in the nature of a substitute favorably. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  9. American Recovery and Reinvestment Act of 2009

    THOMAS, 111th Congress

    Rep. Obey, David R. [D-WI-7

    2009-01-26

    01/26/2009 Placed on the Union Calendar, Calendar No. 1. (All Actions) Notes: For further action, see H.R.1, which became Public Law 111-5 on 2/17/2009. Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  10. Recovery Act Final Project Report -- Transportation Electrification

    SciTech Connect

    Gogineni, Kumar

    2013-12-31

    ChargePoint America demonstrated the viability, economic and environmental benefits of an electric vehicle-charging infrastructure. Electric vehicles (EVs) and plug-in electric vehicles (PHEVs) arrived in late 2010, there was a substantial lack of infrastructure to support these vehicles. ChargePoint America deployed charging infrastructure in ten (10) metropolitan regions in coordination with vehicle deliveries targeting those same regions by our OEM partners: General Motors, Nissan, Fisker Automotive, Ford, smart USA, and BMW. The metropolitan regions include Central Texas (Austin/San Antonio), Bellevue/Redmond (WA), Southern Michigan, Los Angeles area (CA), New York Metro (NY), Central Florida (Orlando/Tampa), Sacramento (CA), San Francisco/San Jose (CA), Washington DC and Boston (MA). ChargePoint America installed more than 4,600 Level 2 (220v) SAE J1772™ UL listed networked charging ports in home, public and commercial locations to support approximately 2000 program vehicles. ChargePoint collected data to analyze how individuals, businesses and local governments used their vehicles. Understanding driver charging behavior patterns will provide the DoE with critical information as EV adoption increases in the United States.

  11. American Recovery and Reinvestment Act of 2009

    THOMAS, 111th Congress

    Sen. Inouye, Daniel K. [D-HI

    2009-01-27

    01/27/2009 Placed on Senate Legislative Calendar under General Orders. Calendar No. 19. (All Actions) Notes: For further action, see H.R.1, which became Public Law 111-5 on 2/17/2009. Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  12. 20 CFR 340.10 - Waiver of recovery of erroneous payments.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 1 2014-04-01 2012-04-01 true Waiver of recovery of erroneous payments. 340... UNEMPLOYMENT INSURANCE ACT RECOVERY OF BENEFITS § 340.10 Waiver of recovery of erroneous payments. (a) When waiver of recovery may be applied. Section 2(d) of the Act provides that there shall be no recovery...

  13. 20 CFR 340.10 - Waiver of recovery of erroneous payments.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 1 2013-04-01 2012-04-01 true Waiver of recovery of erroneous payments. 340... UNEMPLOYMENT INSURANCE ACT RECOVERY OF BENEFITS § 340.10 Waiver of recovery of erroneous payments. (a) When waiver of recovery may be applied. Section 2(d) of the Act provides that there shall be no recovery...

  14. 20 CFR 340.10 - Waiver of recovery of erroneous payments.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 1 2012-04-01 2012-04-01 false Waiver of recovery of erroneous payments. 340... UNEMPLOYMENT INSURANCE ACT RECOVERY OF BENEFITS § 340.10 Waiver of recovery of erroneous payments. (a) When waiver of recovery may be applied. Section 2(d) of the Act provides that there shall be no recovery...

  15. 20 CFR 340.10 - Waiver of recovery of erroneous payments.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 1 2011-04-01 2011-04-01 false Waiver of recovery of erroneous payments. 340... UNEMPLOYMENT INSURANCE ACT RECOVERY OF BENEFITS § 340.10 Waiver of recovery of erroneous payments. (a) When waiver of recovery may be applied. Section 2(d) of the Act provides that there shall be no recovery...

  16. Recovery Online

    ERIC Educational Resources Information Center

    Clark, John R.

    2007-01-01

    Since the founding of Alcoholics Anonymous (AA) in 1935, programs offering opportunity for recovery from alcoholism and other addictions have undergone vast changes. The Internet has created nearly limitless opportunities for recovering people and those seeking recovery to find both meetings and places where they can gather virtually and discuss…

  17. 75 FR 42130 - Notice of Lodging of Consent Decree Under the Clean Air Act; Clean Water Act; Resource...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-20

    ... of Lodging of Consent Decree Under the Clean Air Act; Clean Water Act; Resource Conservation and Recovery Act; Safe Drinking Water Act; Toxic Substances Control Act; and the Reporting Requirements of the... U.S.C. 6901 to 6992k; Safe Drinking Water Act (``SDWA''), 42 U.S.C. 300f to 300j-26;...

  18. 78 FR 15376 - Notice of Lodging of Proposed Consent Decree Amendment Under the Clean Air Act; the Clean Water...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-11

    ... of Lodging of Proposed Consent Decree Amendment Under the Clean Air Act; the Clean Water Act; the Resource Conservation and Recovery Act; the Emergency Planning and Community Right-To-Know Act; and the... Clean Air Act, the Resource Conservation and Recovery Act, the Clean Water Act, the Emergency...

  19. 78 FR 1251 - Notice of Lodging of Proposed Consent Decree Under the Clean Air Act, the Clean Water Act and the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-08

    ... Water Act, 33 U.S.C. 1301 et seq.; and the Resource Conservation and Recovery Act, 42 U.S.C. 6901 et seq... of Lodging of Proposed Consent Decree Under the Clean Air Act, the Clean Water Act and the Resource Conservation and Recovery Act On December 31, 2012, the Department of Justice lodged a proposed Consent...

  20. Calendar Year 2007 Resource Conservation and Recovery Act Annual Monitoring Report for the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee - RCRA Post-Closure Permit Nos. TNHW-113, TNHW-116, and TNHW-128

    SciTech Connect

    Elvado Environmental

    2008-02-01

    This report contains groundwater quality monitoring data obtained during calendar year (CY) 2007 at the following hazardous waste treatment, storage, and disposal (TSD) units located at the US Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee; this S-3 Site, Oil Landfarm, Bear Creek Burial Grounds/Walk-In Pits (BCBG/WIP), Eastern S-3 Site Plume, Chestnut Ridge Security Pits (CRSP), Chestnut Ridge Sediment Disposal Baste (CRSDB), few Hollow Quarry (KHQ), and East Chestnut Ridge Waste Pile (ECRWP). Hit monitoring data were obtained in accordance with the applicable Resource Conservation and Recovery Act of 1976 (RCRA) hazardous waste post-closure permit (PCP). The Tennessee Department of Environment and Conservation (TDEC) - Division of Solid Waste Management issued the PCPs to define the requirements for RCRA post-closure inspection, maintenance, and groundwater monitoring at the specified TSD units located within the Bear Creek Hydrogeologic Regime (PCP no. TNHW-116), Upper East Fork Poplar Creek Hydrogeologic Regime (PCP no. TNHW-113), and Chestnut Ridge Hydrogeologic Regime (PCP no. TNHW-128). Each PCP requires the Submittal of an annual RCRA groundwater monitoring report containing the groundwater sampling information and analytical results obtained at each applicable TSD unit during the preceding CY, along with an evaluation of groundwater low rates and directions and the analytical results for specified RCRA groundwater target compounds; this report is the RCRA annual groundwater monitoring report for CY 2007. The RCRA post-closure groundwater monitoring requirements specified in the above-referenced PCP for the Chestnut Ridge Regime replace those defined in the previous PCP (permit no. TNHW-088), which expired on September 18, 2005, but remained effective until the TDEC issued the new PCP in September 2006. The new PCP defines site-specific groundwater sampling and analysis requirements for the