Sample records for redstone technical test

  1. 1300935

    NASA Image and Video Library

    2013-08-15

    VINCENT VIDAURRI, CENTER, A TECHNICAL SPECIALIST WITH TELEDYNE BROWN ENGINEERING SUPPORTING MISSION OPERATIONS AT THE MARSHALL SPACE FLIGHT CENTER, PROVIDES DETAILS ABOUT A MOCK-UP OF THE INTERNATIONAL SPACE STATION SCIENCE LAB TO A GROUP OF AREA TEACHERS AS PART OF "BACK-2-SCHOOL DAY." TEAM REDSTONE -- WHICH INCLUDES THE MARSHALL SPACE FLIGHT CENTER AND U.S. ARMY ORGANIZATIONS ON REDSTONE ARSENAL -- INVITED 50 TEACHERS TO TOUR REDSTONE ARSENAL AUG. 15, GIVING THEM AN OPPORTUNITY TO LEARN OF AND SEE RESOURCES AVAILABLE TO THEM AND THEIR STUDENTS. THE TOUR FOCUSED ON SITES AVAILABLE FOR FIELD TRIPS FOR STUDENTS STUDYING MATH, SCIENCE, TECHNOLOGY AND ENGINEERING. STOPS INCLUDED MARSHALL'S PAYLOAD OPERATIONS INTEGRATION CENTER AND THE HIGH SCHOOLS UNITED WITH NASA TO CREATE HARDWARE LAB, OR HUNCH, BOTH LOCATED IN BUILDING 4663. THE PROGRAM GIVES HIGH SCHOOL STUDENTS THE CHANCE TO WORK WITH NASA ENGINEERS TO DESIGN AND BUILD HARDWARE FOR USE ON THE INTERNATIONAL SPACE STATION. THE TEACHERS ALSO VISITED THE ARMY AVIATION & MISSILE RESEARCH DEVELOPMENT & ENGINEERING CENTER AND THE REDSTONE TEST CENTER

  2. Test Report: Direct and Indirect Lightning Effects on Composite Materials

    NASA Technical Reports Server (NTRS)

    Evans, R. W.

    1997-01-01

    Lightning tests were performed on composite materials as a part of an investigation of electromagnetic effects on the materials. Samples were subjected to direct and remote simulated lightning strikes. Samples included various thicknesses of graphite filament reinforced plastic (GFRP), material enhanced by expanded aluminum foil layers, and material with an aluminum honeycomb core. Shielding properties of the material and damage to the sample surfaces and joints were investigated. Adding expanded aluminum foil layers and increasing the thickness of GFRP improves the shielding effectiveness against lightning induced fields and the ability to withstand lightning strikes. A report describing the lightning strike tests performed by the U.S. Army Redstone Technical Test Center, Redstone Arsenal, AL, STERT-TE-E-EM, is included as an appendix.

  3. American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 279 IMCOM-Southeast Region: Redstone Arsenal

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hatley, Darrel D.; Goddard, James K.

    2010-09-30

    Report describing a building retuning workshop presented to staff at Redstone Arsenal. Document includes issues identified during building audits and recommendations for future activities to reduce energy use at the site.

  4. An Analysis of the Organizational Structure of Redstone Test Centers Environmental and Components Test Directorate With Regard to Instrumentation Design Capabilities

    DTIC Science & Technology

    2016-09-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA JOINT APPLIED PROJECT AN ANALYSIS OF THE ORGANIZATIONAL STRUCTURE OF REDSTONE...AND SUBTITLE AN ANALYSIS OF THE ORGANIZATIONAL STRUCTURE OF REDSTONE TEST CENTER’S ENVIRONMENTAL AND COMPONENTS TEST DIRECTORATE WITH REGARD TO...provides an analysis of the organizational structure of Redstone Test Center’s Environment and Components Test Directorate, with specific regard to

  5. Early Rockets

    NASA Image and Video Library

    1950-01-01

    Test firing of a Redstone Missile at Redstone Test Stand in the early 1950's. The Redstone was a high-accuracy, liquid-propelled, surface-to-surface missile developed by the von Braun Team under the management of the U.S. Army. The Redstone was the first major rocket development program in the United States.

  6. Mercury Project

    NASA Image and Video Library

    1992-05-01

    The Redstone Test Stand was used during the 1950s in early development of the Redstone missile propulsion system. This was the test stand where the modified Redstone missile that launched into space the first American, Alan Shepard, was static tested as the last step before the flight occurred.

  7. Around Marshall

    NASA Image and Video Library

    1988-01-01

    The Redstone Test Stand, shown here, was used throughout the 1950s to test the Redstone missionile, including the modified Redstone that launched America's first astronaut, Alan Shepard. The U. S. Department of the Interior's Park Services designated the Test Stand as a National Historic Landmark January 22, 1986.

  8. 48. HISTORIC CLOSEUP VIEW OF THE REDSTONE ROCKET IN THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    48. HISTORIC CLOSE-UP VIEW OF THE REDSTONE ROCKET IN THE TEST STAND, WITH THE TAIL SECTION REMOVED, REVEALING THE ROCKET ENGINE WITH SOME OF THE TESTING SENSORS ATTACHED. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  9. Mercury Capsule Separation Tests

    NASA Image and Video Library

    1960-04-01

    Mercury capsule separation from Redstone booster in the Altitude Wind Tunnel (AWT): NASA Lewis conducted full-scale separation tests of the posigrade rockets that were fired after the Redstone rockets burned out. The researchers studied the effect of the posigrade rockets firing on the Redstone booster and retrograde package. This film shows the Mercury capsule being mounted to the Redstone missile model in the Altitude Wind Tunnel. The capsule's engines are fired and it horizontally separates from the Atlas. After firing the capsule swings from an overhead crane.

  10. Redstone Test Stand Accepted Into National Register of Historical Places

    NASA Technical Reports Server (NTRS)

    1976-01-01

    On October 02, 1976, Marshall Space Flight Center's (MSFC) Redstone test stand was received into the National Registry of Historical Places. Photographed in front of the Redstone test stand are Dr. William R. Lucas, MSFC Center Director from June 15, 1974 until July 3, 1986, as he is accepting a certificate of registration from Madison County Commission Chairman James Record, and Huntsville architect Harvie Jones.

  11. Launch Vehicles

    NASA Image and Video Library

    1961-01-01

    This is a comparison illustration of the Redstone, Jupiter-C, and Mercury Redstone launch vehicles. The Redstone ballistic missile was a high-accuracy, liquid-propelled, surface-to-surface missile. Originally developed as a nose cone re-entry test vehicle for the Jupiter intermediate range ballistic missile, the Jupiter-C was a modification of the Redstone missile and successfully launched the first American Satellite, Explorer-1, in orbit on January 31, 1958. The Mercury Redstone lifted off carrying the first American, astronaut Alan Shepard, in his Mercury spacecraft Freedom 7, on May 5, 1961.

  12. 40. HISTORIC VIEW LOOKING WEST AT THE TEST STAND. NOTE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. HISTORIC VIEW LOOKING WEST AT THE TEST STAND. NOTE THE LOAD CELL APPARATUS LOCATED ABOVE THE ROCKET. THE SPACE BETWEEN THE BOTTOM OF THE LOAD CELL APPARATUS AND THE TOP OF THE ROCKET IS THE DIFFERENCE IN SIZE BETWEEN THE REDSTONE ROCKET AND ITS DECEDENT THE JUPITER C ROCKET. THE GAP IS FILLED WITH A SPACER WHEN THEY TEST A REDSTONE ROCKET. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  13. 43. HISTORIC VIEW LOOKING SOUTHWEST AT THE TEST STAND WITH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. HISTORIC VIEW LOOKING SOUTHWEST AT THE TEST STAND WITH A REDSTONE ROCKET BEING FUELED AND PREPARED FOR TESTING. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  14. Redstone Test Stand Accepted Into National Register of Historical Places

    NASA Technical Reports Server (NTRS)

    1976-01-01

    On October 02, 1976, Marshall Space Flight Center's (MSFC) Redstone test stand was received into the National Registry of Historical Places. Photographed in front of the Redstone test stand along with their wives are (left to right), Madison County Commission Chairman James Record, Dr. William R. Lucas, MSFC Center Director from June 15, 1974 until July 3, 1986, (holding certificate), Ed, Buckbee, Space and Rocket Center Director; Harvie Jones, Huntsville Architect; Dick Smith; and Joe Jones.

  15. 51. HISTORIC GENERAL VIEW LOOKING WEST AT THE TEST STAND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. HISTORIC GENERAL VIEW LOOKING WEST AT THE TEST STAND WITH THE MERCURY REDSTONE ROCKET FULLY ASSEMBLED AND BEING PREPARED FOR TESTING. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  16. GENERAL VIEW OF SITE LOOKING SOUTHWEST. JUPITER 'HOP' STAND, FOREGROUND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GENERAL VIEW OF SITE LOOKING SOUTHWEST. JUPITER 'HOP' STAND, FOREGROUND CENTER, REDSTONE TEST STAND FOREGROUND RIGHT, SATURN I C TEST STAND BACKGROUND LEFT. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  17. GENERAL VIEW OF THE INTERIOR OF THE EXTREME NORTH CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GENERAL VIEW OF THE INTERIOR OF THE EXTREME NORTH CONTROL TANK SHOWING THE REMAINING PIECES OF EQUIPMENT USED DURING THE REDSTONE ROCKET TESTING PROGRAM. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  18. 6. PRELIMINARY SKETCH FOR A NEW REDSTONE ARSENAL HEADQUARTERS AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. PRELIMINARY SKETCH FOR A NEW REDSTONE ARSENAL HEADQUARTERS AND ENGINEERING AREA. (PRESENT DAY MARSHALL SPACE FLIGHT CENTER), INCLUDING TEST AREA NUMBER 2 (MSFC, EAST TEST AREA). SEPTEMBER 1951, HANNES LUEHRSEN COLLECTION, MSFC MASTER PLANNING OFFICE. - Marshall Space Flight Center, East Test Area, Dodd Road, Huntsville, Madison County, AL

  19. The Mercury-Redstone Program

    NASA Technical Reports Server (NTRS)

    Hammack, Jerome B.; Heberlig, Jack C.

    1961-01-01

    The Mercury-Redstone program is reviewed as to its intended mission and its main results. The progressive results of unmanned, animal, and manned flights of this over-all Project Mercury ballistic training program are presented. A technical description of the major spacecraft systems is presented with some analysis of flight performance. Performance of the spacecraft with and without pilot input is discussed. The influence of the astronaut as an operating link in the over-all system is presented, and relative difficulties of manned versus unmanned flight are briefly commented upon. The program provided information on man as an integral part of a space flight system, demonstrating that man can assume a primary role in space as he does in other realms of flight. The Mercury-Redstone program demonstrated that the Mercury spacecraft was capable of manned space flight, and succeeded in partially qualifying the spacecraft for orbital flight.

  20. Wernher von Braun

    NASA Image and Video Library

    1958-01-31

    Jet Propulsion Laboratory Director Dr. James Pickering, Dr. James van Allen of the State University of Iowa, and Army Ballistic missionile Agency Technical Director Dr. Wernher von Braun triumphantly display a model of the Explorer I, America's first satellite, shortly after the satellite's launch on January 31, 1958. The Jet Propulsion Laboratory packed and tested the payload, a radiation detection experiment designed by Dr. van Allen. Dr. von Braun's rocket team at Redstone Arsenal in Huntsville, Alabama, developed the Juno I launch vehicle, a modified Jupiter-C.

  1. 49. HISTORIC GENERAL VIEW LOOKING NORTHWEST AT THE TEST STAND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    49. HISTORIC GENERAL VIEW LOOKING NORTHWEST AT THE TEST STAND IN ITS CONFIGURATION FOR THE MERCURY-REDSTONE TESTING PROGRAM. NOTE THE MERCURY CAPSULE BEING ASSEMBLED IN THE FOREGROUND, ALSO NOTE THE LOAD CELL APPARATUS ON THE GROUND IN THE RIGHT OF THE PHOTOGRAPH. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  2. DETAIL VIEW OF THE STRUCTURE OF THE BASE OF THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL VIEW OF THE STRUCTURE OF THE BASE OF THE TEST STAND AND THE TAIL SECTION OF A REDSTONE (JUPITER) ROCKET. NOTE THE FLAME DEFLECTOR BEHIND THE STRUCTURE IN THE FOREGROUND. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  3. Mercury-Redstone: The first American man-rated space launch vehicle

    NASA Astrophysics Data System (ADS)

    Burkhalter, Bettye B.; Sharpe, Mitchell R.

    1990-12-01

    This paper describes the development of the Mercury-Redstone launch vehicle used by the U.S.A. in 1961 to project two manned spacecraft along suborbital ballistic trajectories. It shows that progress in ballistic missile technology dating from World War II contributed to the development of the Redstone missile, which itself was adapted for the Mercury spacecraft launch missions. Among other subjects, the proposal to use a modified Redstone as a manned launch vehicle in the proposed project Adam is recounted as is the role played by the Hermes C1. Particular attention is focused on the engineering adaptations and rigid reliability program of the Redstone missile to fulfill the requirements of launching man. The process of "man-rating" the Mercury-Redstone for this category of mission is explained. Also described are the design, development, and testing procedures developed for Mercury-Redstone. Key points in the design process and decisions made to insure mission success and astronaut safety are reviewed. Finally, the results of the flights of the Mercury Freedom 7 spacecraft piloted by Astronaut Alan B. Shepard on 6 May 1961 and the Mercury Liberty Bell 7 spacecraft piloted by Astronaut Virgil I. Grissom on 21 July 1961 are summarized.

  4. Launch of Mercury-Redstone vehicle 2 on Jan. 21, 1961

    NASA Image and Video Library

    1961-08-10

    S61-01942 (31 Jan. 1961) --- Launch of the Mercury-Redstone 2 (MR-2) vehicle on Jan. 31, 1961. The 16-minute suborbital flight carried biomedical test subject chimpanzee (Ham) aboard. Photo credit: NASA

  5. Chimpanzee "Ham" during preflight activity prior to Mercury-Redstone 2 flight

    NASA Image and Video Library

    1961-01-12

    G61-00337 (31 Jan. 1961) --- Chimpanzee "Ham" during preflight activity with one of his handlers prior to the Mercury-Redstone 2 (MR-2) test flight which was conducted on Jan. 31, 1961. Photo credit: NASA

  6. CHIMPANZEE HAM - POST MERCURY-REDSTONE (MR)-2 FLIGHT

    NASA Image and Video Library

    1963-01-01

    S63-18198 (31 Jan. 1961) --- Closeup view of the chimpanzee "Ham", the live test subject for the Mercury-Redstone 2 (MR-2) test flight, following his successful recovery from the Atlantic. The 420-statute mile suborbital MR-2 flight by the 37-pound primate was a significant accomplishment on the American route toward manned spaceflight. Photo credit: NASA

  7. A Proposed Uniaxial Compression Test for High Strength Ceramics

    DTIC Science & Technology

    1989-09-01

    is lost and catastrophic collapse ensues. The origin of the microcracks may be microplasticity in the form of twinning, 2 or existing flaws such as...Redstone Arsenal, AL 35898-5241 1 ATTN: AIR-O3PAF 1 ATTN: AMSMI-RD-CS-R/Doc 1 AIR-5164J, LT COL J. Sebolka 1 AMSMI-RLM 1 SEA -OSM, Dr. Alex Kaznoff I... SEA -O5MB, LCDR W. M. Elger Commander, U.S. Armament, Munitions and Chemical 1 SEA -05R 25, C. Zanis Command, Dover, NJ 07801 2 ATTN: Technical Library

  8. Around Marshall

    NASA Image and Video Library

    1976-10-02

    On October 02, 1976, Marshall Space Flight Center’s (MSFC) Redstone test stand was received into the National Registry of Historical Places. Photographed in front of the Redstone test stand are Dr. William R. Lucas, MSFC Center Director from June 15, 1974 until July 3, 1986, as he is accepting a certificate of registration from Madison County Commission Chairman James Record, and Huntsville architect Harvie Jones.

  9. Primate Ham - Fitted Suit - Couch - Mercury-Redstone (MR)-2 - Capsule #5

    NASA Image and Video Library

    1961-01-23

    S63-20801 (23 Jan. 1961) --- Primate chimpanzee ?Ham?, in his spacesuit, is fitted into the couch of the Mercury-Redstone 2 (MR-2) capsule #5 prior to its test flight which was conducted on Jan. 31, 1961. Photo credit: NASA

  10. Mercury Project

    NASA Image and Video Library

    1961-03-24

    The Mercury-Redstone Booster Development vehicle (MR-BD) lifts off from Cape Canaveral March 24, 1961. This test flight evaluated changes incorporated in the booster designed to reduce vehicle oscillations and vibrations. The Mercury-Redstone launch vehicle was developed by Dr. Wernher von Braun and the rocket team in Huntsville, Alabama.

  11. Vice President Pence lands at Redstone Army Airfield

    NASA Image and Video Library

    2017-09-25

    Air Force Two lands with Vice President Mike Pence along with Congressman Robert Aderholt at the Redstone Army Airfield in Huntsville, Alabama, on Monday, Sept. 25. They were greeted by NASA’s Marshall Space Flight Center Director Todd May and Redstone Arsenal’s Lt. Gen. Edward Daly. The Vice President is visiting NASA’s Marshall Center to meet with employees, view test hardware for NASA’s Space Launch System — America’s new deep-space rocket, and tour the Payload Operations Integration Center, “science central” for the International Space Station.

  12. Mercury Project

    NASA Image and Video Library

    1961-01-01

    Ham, a three-year-old chimpanzee, in the spacesuit he would wear for the second Mercury- Redstone (MR-2) suborbital test flight in January, 1961. NASA used chimpanzees and other primates to test the Mercury capsule before launching the fisrt American astronaut, Alan Shepard, in May 1961. The Mercury capsule rode atop a modified Redstone rocket, developed by Dr. Wernher von Braun and the German Rocket Team in Huntsville, Alabama.

  13. Ham in Spacesuit

    NASA Technical Reports Server (NTRS)

    1961-01-01

    Ham, a three-year-old chimpanzee, in the spacesuit he would wear for the second Mercury- Redstone (MR-2) suborbital test flight in January, 1961. NASA used chimpanzees and other primates to test the Mercury capsule before launching the fisrt American astronaut, Alan Shepard, in May 1961. The Mercury capsule rode atop a modified Redstone rocket, developed by Dr. Wernher von Braun and the German Rocket Team in Huntsville, Alabama.

  14. Real Time Large Memory Optical Pattern Recognition.

    DTIC Science & Technology

    1984-06-01

    AD-Ri58 023 REAL TIME LARGE MEMORY OPTICAL PATTERN RECOGNITION(U) - h ARMY MISSILE COMMAND REDSTONE ARSENAL AL RESEARCH DIRECTORATE D A GREGORY JUN...TECHNICAL REPORT RR-84-9 Ln REAL TIME LARGE MEMORY OPTICAL PATTERN RECOGNITION Don A. Gregory Research Directorate US Army Missile Laboratory JUNE 1984 L...RR-84-9 , ___/_ _ __ _ __ _ __ _ __"__ _ 4. TITLE (and Subtitle) S. TYPE OF REPORT & PERIOD COVERED Real Time Large Memory Optical Pattern Technical

  15. Around Marshall

    NASA Image and Video Library

    1976-10-02

    On October 02, 1976, Marshall Space Flight Center’s (MSFC) Redstone test stand was received into the National Registry of Historical Places. Photographed in front of the Redstone test stand along with their wives are (left to right), Madison County Commission Chairman James Record, Dr. William R. Lucas, MSFC Center Director from June 15, 1974 until July 3, 1986, (holding certificate), Ed, Buckbee, Space and Rocket Center Director; Harvie Jones, Huntsville Architect; Dick Smith; and Joe Jones.

  16. Early Rockets

    NASA Image and Video Library

    1958-01-31

    Jupiter-C Missile No. 27 assembly at the Army Ballistic Missile Agency (ABMA), Redstone Arsenal, in Huntsville, Aalabama. The Jupiter-C was a modification of the Redstone Missile, and originally developed as a nose cone re-entry test vehicle for the Jupiter Intermediate Range Ballistic Missile (IRBM). Jupiter-C successfully launched the first American Satellite, Explorer 1, in orbit on January 31, 1958.

  17. Redstone Missile

    NASA Technical Reports Server (NTRS)

    2004-01-01

    The image depicts Redstone missile being erected. The Redstone ballistic missile was a high-accuracy, liquid-propelled, surface-to-surface missile developed by Army Ballistic Missile Agency, Redstone Arsenal, in Huntsville, Alabama, under the direction of Dr. von Braun. The Redstone engine was a modified and improved version of the Air Force's Navaho cruise missile engine of the late forties. The A-series, as this would be known, utilized a cylindrical combustion chamber as compared with the bulky, spherical V-2 chamber. By 1951, the Army was moving rapidly toward the design of the Redstone missile, and the production was begun in 1952. Redstone rockets became the 'reliable workhorse' for America's early space program. As an example of the versatility, Redstone was utilized in the booster for Explorer 1, the first American satellite, with no major changes to the engine or missile

  18. Early Rockets

    NASA Image and Video Library

    1953-08-30

    U.S. Army Redstone Rocket: The Redstone ballistic missile was a high-accuracy, liquid-propelled, surface-to-surface missile developed by the Army Ballistic Missile Agency, Redstone Arsenal, in Huntsville, Alabama, under the direction of Dr. von Braun. The Redstone rocket was also known as "Old Reliable" because of its many diverse missions. The first Redstone Missile was launched from Cape Canaveral, Florida on August 30, 1953.

  19. 50 Years of Electronic Check Out and Launch Systems at Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Starr, Stanley O.

    2007-01-01

    When NASA was created in 1958 one of the elements incorporated into this new agency was the Army Ballistic Missile Agency (ABMA) in Huntsville, AL and its subordinate Missile Firing Laboratory (MFL) in Cape Canaveral. Under NASA, the MFL became the Launch Operations Directorate of the George C. Marshall Space Flight Center in Huntsville, but expanding operations in the build up to Apollo dictated that it be given the status of a full fledged Center in July, 1 962[ 1]. The next year it was renamed the John F. Kennedy Space Center (KS C) after the president whose vision transformed its first decade of operation. The ABMA was under the technical leadership of Dr. Werner Von Braun. The MEL was run by his deputy Dr. Kurt Debus, an electrical engineer whose experience in the field began in the early days of V-2 testing in war time Germany. In 1952 a group led by Debus arrived in Cape Canaveral to begin test launches of the new Redstone missile [2]. During the 50's, The MFL built several launch complexes and tested the Redstone, Jupiter and Jupiter C missiles. This small experienced team of engineers and technicians formed the seed from which has grown the KSC team of today. This article briefly reviews the evolution of the KSC electronic technologies for integration, check-out and launch of space vehicles and payloads during NASA's first 50 years.

  20. Redstone Missile on Launch Pad

    NASA Technical Reports Server (NTRS)

    1958-01-01

    Redstone missile No. 1002 on the launch pad at Cape Canaveral, Florida, on May 16, 1958. The Redstone ballistic missile was a high-accuracy, liquid-propelled, surface-to-surface missile developed by the Army Ballistic Missile Agency, Redstone Arsenal, in Huntsville, Alabama, under the direction of Dr. von Braun. The Redstone engine was a modified and improved version of the Air Force's Navaho cruise missile engine of the late forties. The A-series, as this would be known, utilized a cylindrical combustion chamber as compared with the bulky, spherical V-2 chamber. By 1951, the Army was moving rapidly toward the design of the Redstone missile, and production was begun in 1952. Redstone rockets became the 'reliable workhorse' for America's early space program. As an example of the versatility, Redstone was utilized in the booster for Explorer 1, the first American satellite, with no major changes to the engine or missile

  1. SLS Test Hardware Taken to Redstone Arsenal Airfield for Guppy Loading

    NASA Image and Video Library

    2017-07-10

    A structural test article of the Orion Stage Adapter for NASA’s Space Launch System, built at NASA's Marshall Space Flight Center, is transported and prepared to be loaded onto NASA's Super Guppy aircraft. With integrated structural testing complete at Marshall, the stage adapter will soon be transported to Lockheed Martin in Denver for further testing with NASA's Orion spacecraft. The Guppy -- a plane large enough to carry cargo weighing more than 26 tons -- arrived at the U.S. Army's Redstone Arsenal Airfield July 10 to transport the stage adapter. On SLS's first integrated flight with Orion, the OSA will connect Orion to the Interim Cryogenic Propulsion Stage.

  2. n/a

    NASA Image and Video Library

    1953-08-20

    The first Redstone was fired at Cape Canaveral, Florida on August 20, 1953. Redstone was the first major rocket development program for United States by the Peenemuende group led by Dr. Wernher von Braun. The Redstone launch photographed here, from November 17, 1954, was the fifth launch of a Redstone rocket.

  3. Early Rockets

    NASA Image and Video Library

    2004-04-15

    This photograph is of the engine for the Redstone rocket. The Redstone ballistic missile was a high-accuracy, liquid-propelled, surface-to-surface missile developed by the Army Ballistic Missile Agency, Redstone Arsenal, in Huntsville, Alabama, under the direction of Dr. von Braun. The Redstone engine was a modified and improved version of the Air Force's Navaho cruise missile engine of the late forties. The A-series, as this would be known, utilized a cylindrical combustion chamber as compared with the bulky, spherical V-2 chamber. By 1951, the Army was moving rapidly toward the design of the Redstone missile, and the production was begun in 1952. Redstone rockets became the "reliable workhorse" for America's early space program. As an example of its versatility, the Redstone was utilized in the booster for Explorer 1, the first American satellite, with no major changes to the engine or missile.

  4. Early Rockets

    NASA Image and Video Library

    2004-04-15

    The image depicts Redstone missile being erected. The Redstone ballistic missile was a high-accuracy, liquid-propelled, surface-to-surface missile developed by Army Ballistic Missile Agency, Redstone Arsenal, in Huntsville, Alabama, under the direction of Dr. von Braun. The Redstone engine was a modified and improved version of the Air Force's Navaho cruise missile engine of the late forties. The A-series, as this would be known, utilized a cylindrical combustion chamber as compared with the bulky, spherical V-2 chamber. By 1951, the Army was moving rapidly toward the design of the Redstone missile, and the production was begun in 1952. Redstone rockets became the "reliable workhorse" for America's early space program. As an example of the versatility, Redstone was utilized in the booster for Explorer 1, the first American satellite, with no major changes to the engine or missile

  5. Early Rockets

    NASA Image and Video Library

    1958-05-15

    Redstone missile No. 1002 on the launch pad at Cape Canaveral, Florida, on May 16, 1958. The Redstone ballistic missile was a high-accuracy, liquid-propelled, surface-to-surface missile developed by the Army Ballistic Missile Agency, Redstone Arsenal, in Huntsville, Alabama, under the direction of Dr. von Braun. The Redstone engine was a modified and improved version of the Air Force's Navaho cruise missile engine of the late forties. The A-series, as this would be known, utilized a cylindrical combustion chamber as compared with the bulky, spherical V-2 chamber. By 1951, the Army was moving rapidly toward the design of the Redstone missile, and production was begun in 1952. Redstone rockets became the "reliable workhorse" for America's early space program. As an example of the versatility, Redstone was utilized in the booster for Explorer 1, the first American satellite, with no major changes to the engine or missile

  6. Low Cost 2-D Heatshield Materials

    DTIC Science & Technology

    1982-03-05

    1 -4 - -,--. WE: 190 LUU LU w 4A (A IC a -’ I- 0 3c z L U LLJ u0 ud Lad 10 .- qVa . IC -Ab In this test, a...REPOR.’ Dn _1,EHTA’ 1 .;ij PAGE DRSCMLý%IGF" ____ __4 1 33 813C M~J.~~ŽOP Ř. ’rT.19ddsmto S. Type F1@60pNIaOPobw~, aOcovItNK Final Technical Report May...IYD13NUBROPAE Redstone ArseralL.AL 35ý1 __20 1 -MONO’. CRING AG.:hiY HAM41 & AVOR&;S(11 dill. il I.,. Can-r..INA, OflICS) IS- SECUWI *Y CLASS. (@ 1

  7. Chimpanzee 'Ham' In Biopack Couch

    NASA Technical Reports Server (NTRS)

    1961-01-01

    A three-year-old chimpanzee, named Ham, in the biopack couch for the MR-2 suborbital test flight. On January 31, 1961, a Mercury-Redstone launch from Cape Canaveral carried the chimpanzee 'Ham' over 640 kilometers down range in an arching trajectory that reached a peak of 254 kilometers above the Earth. The mission was successful and Ham performed his lever-pulling task well in response to the flashing light. NASA used chimpanzees and other primates to test the Mercury Capsule before launching the first American astronaut Alan Shepard in May 1961. The successful flight and recovery confirmed the soundness of the Mercury-Redstone systems.

  8. Mercury Project

    NASA Image and Video Library

    1961-01-31

    A three-year-old chimpanzee, named Ham, in the biopack couch for the MR-2 suborbital test flight. On January 31, 1961, a Mercury-Redstone launch from Cape Canaveral carried the chimpanzee "Ham" over 640 kilometers down range in an arching trajectory that reached a peak of 254 kilometers above the Earth. The mission was successful and Ham performed his lever-pulling task well in response to the flashing light. NASA used chimpanzees and other primates to test the Mercury Capsule before launching the first American astronaut Alan Shepard in May 1961. The successful flight and recovery confirmed the soundness of the Mercury-Redstone systems.

  9. Mercury Project

    NASA Image and Video Library

    1961-01-01

    A three-year-old chimpanzee, named Ham, in the biopack couch for the MR-2 suborbital test flight. On January 31, 1961, a Mercury-Redstone launch from Cape Canaveral carried the chimpanzee "Ham" over 640 kilometers down range in an arching trajectory that reached a peak of 254 kilometers above the Earth. The mission was successful and Ham performed his lever-pulling task well in response to the flashing light. NASA used chimpanzees and other primates to test the Mercury Capsule before launching the first American astronaut Alan Shepard in May 1961. The successful flight and recovery confirmed the soundness of the Mercury-Redstone systems.

  10. History of the Redstone Missile System

    DTIC Science & Technology

    1965-10-15

    knowledge in areas such as propulsion systems, rocket fuels, aerodynamics, guidance equipment, and’testing equipment. It compiled basic statistics on...i n g of t he 46th and 4 3 Tech Rept, ABMA, 30 Jun 57, sub: Ordnance Guided M i s s i l e and Rocket Programs, Redstone, Vol. IVg Supp. 2, p. 67...embarked in June for Europe. The main body boarded ship on 18 June 1958 for Saint-Nazaire, France , and moved in convoy across France and 48~ept

  11. A Chimpanzee, 'Ham,' in the Biopack Couch for the MR-2 Flight

    NASA Technical Reports Server (NTRS)

    1961-01-01

    A three-year-old chimpanzee, named Ham, in the biopack couch for the MR-2 suborbital test flight. On January 31, 1961, a Mercury-Redstone launch from Cape Canaveral carried the chimpanzee 'Ham' over 640 kilometers down range in an arching trajectory that reached a peak of 254 kilometers above the Earth. The mission was successful and Ham performed his lever-pulling task well in response to the flashing light. NASA used chimpanzees and other primates to test the Mercury Capsule before launching the first American astronaut Alan Shepard in May 1961. The successful flight and recovery confirmed the soundness of the Mercury-Redstone systems.

  12. 31. HISTORIC VIEW OF TEST STAND NO. 1 AT PEENEMUENDE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. HISTORIC VIEW OF TEST STAND NO. 1 AT PEENEMUENDE A-4 ENGINE AND ROCKET PROPULSION TEST STAND. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  13. In-Flight Performance Evaluation of Experimental Information Displays

    DTIC Science & Technology

    1979-05-01

    Chemical Systems Laboratory Experimentation Command Aberden Proving Ground ,MD Technical Library 21010 (1) Box 22 Fort Ord, CA 93941 (1) 21 US Amy Materiel...US Army Missile R&D Command Library, Bldg 3071 Redstone Arsenal, AL 35809 (1) ATTN: ATSL-DOSL Aberdeen Proving Ground , MD US Army Yuma Proving Ground ...Systems Chief Analysis Agency Benet Weapons Laboratory ATTN: Reports Distribution LCWSL, USA ARRADCOH Aberdeen Proving Ground , MD ATTN: DRDAR-LCB-TL

  14. Conceptual Design of a Robotic Loader System for Remote Missile Launchers.

    DTIC Science & Technology

    1985-09-01

    artifcial intelligence were sur- veyed in order to assess their space applicability and to identify areas which can be developed/adapted to European...such data bases as NTIS and COMPENDEX. The second computer aided search was done through the U. S. Army information services at Redstone Arsenal...Lockheed Corporation. The first DIALOG data base explored was NTIS (National Technical Information Services, U.S. Dept. of Commerce), which contains

  15. 45. HISTORIC AERIAL VIEW LOOKING SOUTHWEST AT THE TEST STAND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. HISTORIC AERIAL VIEW LOOKING SOUTHWEST AT THE TEST STAND AND THE SURROUNDING ELECTRONICS AND EQUIPMENT TRAILERS. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  16. Vertical Windshear Below 5.5 Kilometers in the Vicinity of Berlin, Germany.

    DTIC Science & Technology

    1986-08-01

    DIRECTORATE- L LEVITT ET AL . UNCL~ASSFE UG 66 AMSMI/TR-RD-RE-96-9 SBIAD-E951 031 F/G 4/2 N smmmmhhhhhm moommhmhhhuo im -~ L L0 MICROCOPY RESOLUTION TEST...AD-RI82 432 VERTICAL NINDSHEAR BELOW 55 KILOMETERS IN THE VICINITY 1/1 OF BERLIN GERMANY..(U) ARMY MISSILE COMMAND REDSTONE ARSENAL AL RESEARCH...ADDRESS (City, State, an ZIP Code) 7b ADDRESS (City, State, and ZIP Code) Comunder US Army Missile Coeypini ATTN4: AISMI-RO-RE Redstone Arsenal,* AL 35898

  17. Officials Stand Before Mercury-Redstone Booster

    NASA Technical Reports Server (NTRS)

    2004-01-01

    This photograph shows a group of officials standing before a Mercury-Redstone booster at the Marshall Space Flight Center (MSFC). Among those in the photograph are astronauts James Lovell, Walter Schirra, and Gus Grissom. Also pictured is Joachim Kuettner who managed responsibilities of MSFC's Mercury-Redstone program.

  18. Flaw Detection and Evaluation of Composite Cylinders Using Laser Speckle Interferometry and Holography

    DTIC Science & Technology

    1979-11-23

    Entered) ACKNOWLEDGMENTS The author hereby expresses his appreciation to Mr. J. A. Schaeffel Jr. for his guidance on interferometry and the computer...were collected by an automated laser speckle interferometry displacement contour analyzer developed by John A. Schaeffel , Jr. [3]. The new method of 10...Fringe Patterns, US Army Missile Command, Redstone Arsenal, Alabama, Technical Report RL-76-18, 20 April 1976. 3. Schaeffel , J. A., Automated Laser

  19. KSC-2011-3333

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- On Cape Canaveral Air Force Station in Florida, invited guests tour the blockhouse at Complex 5/6 during a celebration of Alan Shepard's historic flight 50 years ago. From left are Robert Sieck, former shuttle launch director; Andy Anderson, former manager for communications in the Mercury Mission Control Center; Bob Moser, former chief test conductor for the Mercury-Redstone launches; and John Twigg, former backup chief test conductor for the Mercury-Redstone launches. The celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  20. OVERALL VIEW OF THE SITE, INSTRUMENTATION AND CONTROL TANKS IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OVERALL VIEW OF THE SITE, INSTRUMENTATION AND CONTROL TANKS IN FOREGROUND, ROCKET TEST STAND IN BACKGROUND LEFT. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  1. Concentrating Solar Power Projects - Redstone Solar Thermal Power Plant |

    Science.gov Websites

    Concentrating Solar Power | NREL Redstone Solar Thermal Power Plant Status Date: September 8 , 2016 Project Overview Project Name: Redstone Solar Thermal Power Plant Country: South Africa Location ): 100.0 MW Turbine Capacity (Net): 100.0 MW Cooling Method: Dry cooling Thermal Storage Storage Type: 2

  2. 37. HISTORIC GENERAL VIEW LOOKING WEST OF TEST STAND AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. HISTORIC GENERAL VIEW LOOKING WEST OF TEST STAND AND ROCKET DURING TEST FIRING NUMBER 2. NOTE THE FLAME BEING EMITTED FROM THE BOTTOM OF THE ROCKET. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  3. The Need for Increased Critical Technical Skills: Integrating Federal Aviation Administration Airframe and Powerplant Certification in Aircraft Maintenance Force Development

    DTIC Science & Technology

    2011-12-18

    Joaquin Valley College. On-line, Internet. Available at http://www.sjvc.edu/program/Aviation_Maintenance_Technology/ Kansas State University- Salinas ...systems. $- $5,000 $10,000 $15,000 $20,000 $25,000 $30,000 $35,000 $40,000 $45,000 Broward College San Joaquin Valley ...40,000 $45,000 AF A&P Certification Program Broward College San Joaquin Valley College Kansas State University Redstone College

  4. 32. HISTORIC VIEW OF GERMAN ROCKET SOCIETY VETERAN KURT HEINISCH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    32. HISTORIC VIEW OF GERMAN ROCKET SOCIETY VETERAN KURT HEINISCH IN CONTROL ROOM AT TEST STAND NO. 1, PEENEMUENDE. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  5. 30. SKETCH OF THE PROPOSED TEST STAND FOR THE ORDNANCE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. SKETCH OF THE PROPOSED TEST STAND FOR THE ORDNANCE GUIDED MISSILE CENTER AT REDSTONE ARSENAL (PRE-DATING NASA). JUNE, 1951, HANS LUEHRSEN COLLECTION, MSFC MASTER PLANNING OFFICE. - Marshall Space Flight Center, Saturn Propulsion & Structural Test Facility, East Test Area, Huntsville, Madison County, AL

  6. 28. HISTORIC VIEW OF A3 ROCKET IN TEST STAND NO. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. HISTORIC VIEW OF A-3 ROCKET IN TEST STAND NO. 3 AT KUMMERSDORF (THE LARGEST TEST STAND AT KUMMERSDORF). THE STAND WAS MOBILE, SINCE IT MOVED ALONG RAILS. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  7. Recovery - Mercury-Redstone (MR)-2 - Loaded on Ship - Chimp "Ham"

    NASA Image and Video Library

    1961-01-31

    S61-00199 (31 Jan. 1961) --- Recovery personnel aboard the USS Donner remove ?Ham?, a 37-pound chimpanzee, from a Mercury-Redstone spacecraft following the successful Mercury-Redstone 2 (MR-2) suborbital flight from Cape Canaveral, Florida. The primate's 420-statute mile MR-2 flight was a significant accomplishment on the American route toward manned spaceflight. Photo credit: NASA

  8. 23. HISTORIC VIEW OF ONE STICK REPULSOR OF RAKETENFLUGPLATZ GROUP. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. HISTORIC VIEW OF ONE STICK REPULSOR OF RAKETENFLUGPLATZ GROUP. POSSIBLY 1931, THE STAND IS FOR LAUNCHING NOT FOR STATIC TESTS. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  9. Short-Time Mass Variation in Natural Atmospheric Dust.

    DTIC Science & Technology

    1979-11-01

    many years. When the Krakatoa volcano in the South Pacific erupted in 1883, ejecting tons of dust into the high atmosphere, people from many parts of the...Flight Center, AL 35812 Commander Naval Ocean Systems Center (Code 4473) Commander ATTN: Technical Library US Army Missile R&D Command San Diego, CA...PO Box 67 ATTN: DRDMI-TBD APO San Francisco, CA 96555 US Army Missile R&D Command Redstone Arsenal, AL 35809 Director NOAA/ERL/APCL R31 Commander RB3

  10. Around Marshall

    NASA Image and Video Library

    2002-10-26

    This plaque, displayed on the grounds of Marshall Space Flight Center in Huntsville, Alabama, commemorates the Redstone Test Stand as an Alabama Historic Civil Engineering Landmark. The site was desinated as such in 1979.

  11. Chimpanzee Ham after sucessful MR-2 flight

    NASA Technical Reports Server (NTRS)

    1963-01-01

    Closeup view of the chimpanzee 'Ham', the live test subject for Mercury-Redstone 2 test flight being fed an apple. This photo was taken after his successful recovery from the Atlantic. Note he is still strapped into his special flight couch.

  12. VIEW LOOKING SOUTHWEST AT THE EARTH MOUND USED TO ENCASE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW LOOKING SOUTHWEST AT THE EARTH MOUND USED TO ENCASE THE INSTRUMENTATION AND CONTROL TANKS AND PROTECT EQUIPMENT. NOTE THE TEST STAND IN THE BACKGROUND RIGHT. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  13. 4. PROPOSED C1 ASSEMBLY AND TESTING FACILITIES FOR THE ORDINANCE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. PROPOSED C-1 ASSEMBLY AND TESTING FACILITIES FOR THE ORDINANCE GUIDED MISSILE CENTER AT REDSTONE ARSENAL, NEAR THE SOUTH END OF MADKIN MOUNTAIN. OCTOBER 1950, HANNES LUEHRSEN COLLECTION, MSFC MASTER PLANNING OFFICE. - Marshall Space Flight Center, East Test Area, Dodd Road, Huntsville, Madison County, AL

  14. 39. HISTORIC VIEW LOOKING WEST AT THE TEST STAND WITH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. HISTORIC VIEW LOOKING WEST AT THE TEST STAND WITH THE COLD CALIBRATION TOWER CONSTRUCTED TO THE LEFT OF THE ROCKET AND AN ACCESS PLATFORM BUILT TO REACH THE TOP OF THE ROCKET MORE EASILY. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  15. 44. HISTORIC VIEW LOOKING WEST AT THE TEST STAND AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. HISTORIC VIEW LOOKING WEST AT THE TEST STAND AND ROCKET BEING PREPARED FOR TESTING. NOTE THE LOAD CELL APPARATUS ABOVE THE ROCKET AND THE EQUIPMENT PLATFORM TO THE LEFT OF THE LOAD CELL HAVE BEEN ENCLOSED FOR PROTECTION FROM THE CLIMATE. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  16. 36. HISTORIC GENERAL VIEW LOOKING NORTH DOWN THE FLAME TRENCH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. HISTORIC GENERAL VIEW LOOKING NORTH DOWN THE FLAME TRENCH AT THE TEST STAND. NOTE THE MOTORIZED LIFT TO THE LEFT OF THE TEST STAND, USED TO ACCESS THE INSTRUMENTATION PLATFORM ('BIRDCAGE') MOUNTED ON TOP OF THE ROCKET DURING TEST FIRINGS. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  17. 38. HISTORIC CLOSER VIEW LOOKING WEST OF THE TEST STAND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. HISTORIC CLOSER VIEW LOOKING WEST OF THE TEST STAND AND ROCKET DURING TEST FIRING NUMBER 10. NOTE THE NUMBER ALONG THE TOP RAIL OF THE STAND JUST TO THE RIGHT OF THE ROCKET, THIS NUMBER INDICATES WHAT NUMBER TEST IS BEING CONDUCTED. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  18. 19. HISTORIC VIEW OF MAX VALIER IN AN EARLY STATIC ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. HISTORIC VIEW OF MAX VALIER IN AN EARLY STATIC TEST. THE ROCKET IS SITTING ON A SCALE. VALIER IS MEASURING THRUST BY ADDING WEIGHT LIKE THE ONE IN HIS RIGHT HAND. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  19. Around Marshall

    NASA Image and Video Library

    2000-10-26

    This plaque, displayed on the grounds of Marshall Space Flight Center in Huntsville, Alabama, commemorates the Redstone Test Stand as a National Historic Landmark. The site was designated as such in 1985 by the National Park Service of the United States Department of the Interior.

  20. DETAIL VIEW OF THE ROCKET TRANSFER CART. NOTE THE VALVE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL VIEW OF THE ROCKET TRANSFER CART. NOTE THE VALVE BOX IN THE FOREGROUND RIGHT WITH AN EYE WASH FAUCET PROJECTING OUT. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  1. 18. HISTORIC VIEW OF MAX VALIER, FOUNDING MEMBER OF THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. HISTORIC VIEW OF MAX VALIER, FOUNDING MEMBER OF THE VEREIN FUER RAUMSCHIFFAHRT (GERMAN SOCIETY FOR SPACE TRAVEL), DRIVES HIS ROCKET CAR IN 1931. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  2. 106-17 Telemetry Standards Front Matter

    DTIC Science & Technology

    2017-07-01

    IS UNLIMITED ABERDEEN TEST CENTER DUGWAY PROVING GROUND REAGAN TEST SITE REDSTONE TEST CENTER WHITE SANDS MISSILE RANGE YUMA PROVING GROUND...Council US Army White Sands Missile Range, New Mexico 88002-5110 This page intentionally left blank. Telemetry Standards, IRIG Standard 106-17...TM receiver commands for interoperability. f. Task TG-141: Update IRIG 106 with Standards for Data Quality Metrics (DQM) and Data Quality

  3. 17. HISTORIC VIEW OF ROCKET & LAUNCH STAND DESIGNED BY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. HISTORIC VIEW OF ROCKET & LAUNCH STAND DESIGNED BY HERMANN OBERTH AND RUDOLF NEBEL FOR THE MOVIE DIE FRAU IM MOND (THE WOMAN ON THE MOON). THE LAUNCH STAND WAS MODIFIED BY THE VFR FOR THE FIRST TEST STAND AT RAKETENFLUGPLATZ NEAR BERLIN. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  4. 25. HISTORIC VIEW OF A2 ROCKET (FULLY ASSEMBLED) EXCEPT FOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. HISTORIC VIEW OF A-2 ROCKET (FULLY ASSEMBLED) EXCEPT FOR GN2 CONTAINER. AT TEST STAND NO. 1 IN KUMMERSDORF. THE STAND WAS DESIGNED & CONSTRUCTED IN 1932. ROCKET IS BEING TANKED WITH LOX PRECEDING A STATIC FIRING. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  5. The High Energy Lightning Simulator (HELS) Test Facility for Testing Explosive Items

    DTIC Science & Technology

    1996-08-01

    Center, Redstone Arsenal, AL Thomas E. Roy and David W. Bagwell AMTEC Corporation, Huntsville, AL ABSTRACT Details of the High Energy Lightning...simulated lightning testing of inerted missiles and inerted explosive items containing electrically initiated explosive trains is to determine the...penetrate the safety cages, which are electrically conductive and grounded, without loss of current. This transmission system consists of six large

  6. Saturn Apollo Program

    NASA Image and Video Library

    1960-01-01

    The Saturn Project was approved on January 18, 1960 as a program of the highest national priority. The formal test program to prove out the clustered-booster concept was well underway at Redstone Arsenal. This photograph depicts a mockup of the Saturn booster (S-I stage) being transported to the Army Ballistic Missile Agency (ABMA) test stand, to check mating of the booster and stand and servicing methods.

  7. Saturn Apollo Program

    NASA Image and Video Library

    1964-10-01

    Test firing of the Saturn I S-I Stage (S-1-10) at the Marshall Space Flight Center. This test stand was originally constructed in 1951 and sometimes called the Redstone or T tower. In l961, the test stand was modified to permit static firing of the S-I/S-IB stages, which produced a total thrust of 1,600,000 pounds. The name of the stand was then changed to the S-IB Static Test Stand.

  8. Combustion Science

    NASA Image and Video Library

    2003-04-01

    This photograph depicts one of over thirty tests conducted on the Vortex Combustion Chamber Engine at Marshall Space Flight Center's (MSFC) test stand 115, a joint effort between NASA's MSFC and the U.S. Army AMCOM of Redstone Arsenal. The engine tests were conducted to evaluate an irnovative, "self-cooled", vortex combustion chamber, which relies on tangentially injected propellants from the chamber wall producing centrifugal forces that keep the relatively cold liquid propellants near the wall.

  9. 77 FR 23813 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ... bldg. 4704 and dispatch--bldg 4707, fair conditions; need repairs Bldg. 8404 Redstone Arsenal Redstone...; current use: varies; fair to poor conditions--bldgs. need repairs; possible asbestos 5 Bldgs. Hunter Army...: 1208, 1209, 1211, 1212, 1221 Comments: Off-site removal only; sq. ft. varies; current use: varies; fair...

  10. 76 FR 78294 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... asbestos and lead base paint 10 Bldgs. Redstone Arsenal Redstone Arsenal AL 35898 Landholding Agency: Army..., 1405A, 1406, 1406A Comments: off-site removal only; possible asbestos and lead base paint; sq. ft...-100 sq. ft.; current use: storage to base exchange; need repairs; possible asbestos Suitable/Available...

  11. KSC-2011-3329

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- Program participants pose for a group photo in front of a replica of a Mercury-Redstone rocket during a celebration at Complex 5/6 on Cape Canaveral Air Force Station in Florida. From left are Hugh Harris, former director of Public Affairs at Kennedy Space Center; Alice Wackermann, Julie Jenkins and Laura Churchley, daughters of astronaut Alan Shepard; Jack King, former chief, Public Information Office, Marshall Space Flight Center; Bob Moser, former chief test conductor for the Mercury-Redstone launches; NBC reporter Jay Barbree; Mercury astronaut Scott Carpenter; Kennedy Space Center Director Bob Cabana; Lieutenant General Susan J. Helms, commander of the 14th Air Force and former astronaut; and NASA Administrator Charlie Bolden. The celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  12. Saturn Apollo Program

    NASA Image and Video Library

    1960-01-19

    The Saturn Project was approved on January 18, 1960 as a program of the highest national priority. The formal test program, to prove out the clustered-booster concept, was well underway at Redstone Arsenal. This photograph depicts a mockup of the Saturn booster (S-I stage) being installed in the Army Ballistic Missile Agency (ABMA) test stand, on January 19, 1960, to check mating of the booster and stand and servicing methods.

  13. Saturn Apollo Program

    NASA Image and Video Library

    1960-01-19

    The Saturn Project was approved on January 18, 1960, as a program of the highest national priority. The formal test program to prove out the clustered-booster concept was well underway at Redstone Arsenal. This photograph depicts a mockup of the Saturn booster (S-I stage) being installed in the Army Ballistic Missile Agency (ABMA) test stand, on January 19, 1960, to check mating of the booster and stand and servicing methods.

  14. Field Testing and Summary Report for Road 5 (Morris Road) Over Road 3 (Toftoy Throughway) at Redstone Arsenal, AL: Contractor’s Supplemental Report for Project F09-AR16

    DTIC Science & Technology

    2016-08-01

    transducers to the structural members depending on whether they are steel, concrete, timber , FRP, or other. For steel structures , quite often the...25th, 2010 despite inclement weather including rain and wind. The BDI Wireless Structural Testing System (STS-WiFi) was used for measuring strains...III 1. STRUCTURAL TESTING PROCEDURES

  15. KSC-2011-3334

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- Bob Moser, former chief test conductor for the Mercury-Redstone launches, tours the blockhouse at Complex 5/6 on Cape Canaveral Air Force Station in Florida. The celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  16. A History of the Mobile District Corps of Engineers 1815-1985

    DTIC Science & Technology

    2002-01-01

    277 13-2 The Panama Canal area under the new Panama Canal Treaty (MDO...Missile Agency is established at Redstone Arsenal. 1957 First successful American anti-ICBM is fired. Nike -Zeus program is headquartered at Redstone...designated to serve under each Division Engineer. The Annual Report submitted by each officer indicated the territory for which each was responsible for

  17. View looking north west showing the boom, top of the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View looking north west showing the boom, top of the center mast and boom angle reeving of the 175-ton derrick. Note in the background of the view, just above the center mast is the F-1 Static-Test Stand used for test firing the Saturn V engines and subsequent program's engine testing. Also in the background center is the Redstone Static Test Stand (center right) and it's cold calibration tower (center left). - Marshall Space Flight Center, Saturn V Dynamic Test Facility, East Test Area, Huntsville, Madison County, AL

  18. Attempted Recovery - Mercury Spacecraft - End - Mercury-Redstone (MR)-4 Mission

    NASA Image and Video Library

    1961-07-27

    S61-02820 (21 July 1961) --- Attempted recovery of Mercury spacecraft at end of the Mercury-Redstone 4 (MR-4) mission. View shows the Marine helicopter pulled almost to the waters surface by the weight of the capsule, which filled with water. It eventually had to abandon its recovery attempts. Behind the Marine helicopter, a Navy helicopter prepares to assist. Photo credit: NASA

  19. Early Rockets

    NASA Image and Video Library

    1957-10-03

    America’s first scientific satellite, the Explorer I, carried the radiation detection experiment designed by Dr. James Van Allen and discovered the Van Allen Radiation Belt. It was launched aboard a modified redstone rocket known as the Jupiter C, developed by Dr. von Braun’s rocket team at Redstone Arsenal in Huntsville, Alabama. The satellite launched on January 31, 1958, just 3 months after the the von Braun team received the go-ahead.

  20. 20. HISTORIC VIEW OF THE VEREIN FUER RAUMSCHIFFAHRT, 1930. LEFT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. HISTORIC VIEW OF THE VEREIN FUER RAUMSCHIFFAHRT, 1930. LEFT TO RIGHT: RUDOLF NEBEL, FRANZ RITTER, UNKNOWN, KURT HEINISCH, UNKNOWN, HERMANN OBERTH, UNKNOWN, KLAUS RIEDEL, WERNHER VON BRAUN, UNKNOWN, KLAUS RIEDEL HOLDS EARLY VERSION OR MODEL FOR THE MINIMUM ROCKET, 'MIRAK'. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  1. Marshall Space Flight Center Test Capabilities

    NASA Technical Reports Server (NTRS)

    Hamilton, Jeffrey T.

    2005-01-01

    The Test Laboratory at NASA's Marshall Space Flight Center has over 50 facilities across 400+ acres inside a secure, fenced facility. The entire Center is located inside the boundaries of Redstone Arsenal, a 40,000 acre military reservation. About 150 Government and 250 contractor personnel operate facilities capable of all types of propulsion and structural testing, from small components to engine systems and structural strength, structural dynamic and environmental testing. We have tremendous engineering expertise in research, evaluation, analysis, design and development, and test of space transportation systems, subsystems, and components.

  2. Saturn Apollo Program

    NASA Image and Video Library

    1960-01-01

    The Saturn Project was approved on January 18, 1960 as a program of the highest national priority. The formal test program to prove out the clustered-booster concept was well underway at Redstone Arsenal. This photograph depicts a mockup of the Saturn booster (S-I stage) being placed on a transporter and later being installed in the Army Ballistic Missile Agency (ABMA) test stand, on January 19, 1960, to check mating of the booster and stand and servicing methods.

  3. The Testing Behind The Test Facility: The Acoustic Design of the NASA Glenn Research Center's World-Class Reverberant Acoustic Test Facility

    NASA Technical Reports Server (NTRS)

    Hozman, Aron D.; Hughes, William O.; McNelis, Mark E.; McNelis, Anne M.

    2011-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is leading the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC's Plum Brook Station in Sandusky, Ohio, USA. Benham Companies, LLC is currently constructing modal, base-shake sine and reverberant acoustic test facilities to support the future testing needs of NASA's space exploration program. The large Reverberant Acoustic Test Facility (RATF) will be approximately 101,000 cu ft in volume and capable of achieving an empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world's known active reverberant acoustic test facilities. The key to achieving the expected acoustic test spectra for a range of many NASA space flight environments in the RATF is the knowledge gained from a series of ground acoustic tests. Data was obtained from several NASA-sponsored test programs, including testing performed at the National Research Council of Canada's acoustic test facility in Ottawa, Ontario, Canada, and at the Redstone Technical Test Center acoustic test facility in Huntsville, Alabama, USA. The majority of these tests were performed to characterize the acoustic performance of the modulators (noise generators) and representative horns that would be required to meet the desired spectra, as well as to evaluate possible supplemental gas jet noise sources. The knowledge obtained in each of these test programs enabled the design of the RATF sound generation system to confidently advance to its final acoustic design and subsequent on-going construction.

  4. The Development of the Acoustic Design of NASA Glenn Research Center's New Reverberant Acoustic Test Facility

    NASA Technical Reports Server (NTRS)

    Hughes, William O.; McNelis, Mark E.; Hozman, Aron D.; McNelis, Anne M.

    2011-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is leading the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC s Plum Brook Station in Sandusky, Ohio. Benham Companies, LLC is currently constructing modal, base-shake sine and reverberant acoustic test facilities to support the future testing needs of NASA s space exploration program. The large Reverberant Acoustic Test Facility (RATF) will be approximately 101,000 ft3 in volume and capable of achieving an empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world s known active reverberant acoustic test facilities. The key to achieving the expected acoustic test spectra for a range of many NASA space flight environments in the RATF is the knowledge gained from a series of ground acoustic tests. Data was obtained from several NASA-sponsored test programs, including testing performed at the National Research Council of Canada s acoustic test facility in Ottawa, Ontario, Canada, and at the Redstone Technical Test Center acoustic test facility in Huntsville, Alabama. The majority of these tests were performed to characterize the acoustic performance of the modulators (noise generators) and representative horns that would be required to meet the desired spectra, as well as to evaluate possible supplemental gas jet noise sources. The knowledge obtained in each of these test programs enabled the design of the RATF sound generation system to confidently advance to its final acoustic design and subsequent on-going construction.

  5. The Development of the Acoustic Design of NASA Glenn Research Center's New Reverberant Acoustic Test Facility

    NASA Technical Reports Server (NTRS)

    Hughes, William O.; McNelis, Mark E.; Hozman, Aron D.; McNelis, Anne M.

    2011-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is leading the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC's Plum Brook Station in Sandusky, Ohio, USA. Benham Companies, LLC is currently constructing modal, base-shake sine and reverberant acoustic test facilities to support the future testing needs of NASA s space exploration program. The large Reverberant Acoustic Test Facility (RATF) will be approximately 101,000 ft3 in volume and capable of achieving an empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world s known active reverberant acoustic test facilities. The key to achieving the expected acoustic test spectra for a range of many NASA space flight environments in the RATF is the knowledge gained from a series of ground acoustic tests. Data was obtained from several NASA-sponsored test programs, including testing performed at the National Research Council of Canada s acoustic test facility in Ottawa, Ontario, Canada, and at the Redstone Technical Test Center acoustic test facility in Huntsville, Alabama, USA. The majority of these tests were performed to characterize the acoustic performance of the modulators (noise generators) and representative horns that would be required to meet the desired spectra, as well as to evaluate possible supplemental gas jet noise sources. The knowledge obtained in each of these test programs enabled the design of the RATF sound generation system to confidently advance to its final acoustic design and subsequent on-going construction.

  6. 47 CFR 90.371 - Dedicated short range communications service.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Ligget, CA 355756N 1211404W Pacific Missile Test Center, CA 340914N 1190524W Naval Air Development Center... 405600N 0743400W Redstone Arsenal, AL 343630N 0863610W White Sands Missile Range, NM 322246N 1062813W Army Research Laboratory, MD 390000N 0765800W Space and Missile Systems Center, CA 335500N 1182200W Edwards AFB...

  7. 47 CFR 90.371 - Dedicated short range communications service.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Ligget, CA 355756N 1211404W Pacific Missile Test Center, CA 340914N 1190524W Naval Air Development Center... 405600N 0743400W Redstone Arsenal, AL 343630N 0863610W White Sands Missile Range, NM 322246N 1062813W Army Research Laboratory, MD 390000N 0765800W Space and Missile Systems Center, CA 335500N 1182200W Edwards AFB...

  8. 47 CFR 90.371 - Dedicated short range communications service.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Ligget, CA 355756N 1211404W Pacific Missile Test Center, CA 340914N 1190524W Naval Air Development Center... 405600N 0743400W Redstone Arsenal, AL 343630N 0863610W White Sands Missile Range, NM 322246N 1062813W Army Research Laboratory, MD 390000N 0765800W Space and Missile Systems Center, CA 335500N 1182200W Edwards AFB...

  9. 47 CFR 90.371 - Dedicated short range communications service.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Ligget, CA 355756N 1211404W Pacific Missile Test Center, CA 340914N 1190524W Naval Air Development Center... 405600N 0743400W Redstone Arsenal, AL 343630N 0863610W White Sands Missile Range, NM 322246N 1062813W Army Research Laboratory, MD 390000N 0765800W Space and Missile Systems Center, CA 335500N 1182200W Edwards AFB...

  10. DETAIL VIEW OF THE WEST INTERIOR WALL OF THE EXTREME ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL VIEW OF THE WEST INTERIOR WALL OF THE EXTREME NORTH (CONTROL) TANK. NOTE THE TWO PERISCOPES IN THE UPPER PART OF THE PHOTOGRAPH. ALSO NOTE THE CONTROL PANEL IN THE MIDDLE OF THE PHOTO, THIS WAS USED TO CONTROL THE REMOTE 'FIRE-EX' WATER NOZZLES. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  11. Uniformed Services Worldwide Legal Assistance & Reserve Components Office Directory. Revised.

    DTIC Science & Technology

    1999-11-01

    Number: 256-876-9438 E-mail: ihermin@redstone-emhl.army.mil j ohn .henningsen@redstone. army.mil Practice Area: 600 Public Contract Law Bars...mail Address: thompsonia@cbcph.navy.mil Practice Area: 600 - Public Contract Law ; 451 - Government-Federal Level; 365 - Environmental Law Bars...Employment Law; 600 - Public Contract Law Bars Admitted: DC, IL County of Practice: Prince George’s, MD 22 AIR FORCE 89 AW/JA 1535 Command Drive

  12. Early Rockets

    NASA Image and Video Library

    2004-04-15

    Engine for the Jupiter rocket. The Jupiter vehicle was a direct derivative of the Redstone. The Army Ballistic Missile Agency (ABMA) at Redstone Arsenal, Alabama, continued Jupiter development into a successful intermediate ballistic missile, even though the Department of Defense directed its operational development to the Air Force. ABMA maintained a role in Jupiter RD, including high-altitude launches that added to ABMA's understanding of rocket vehicle operations in the near-Earth space environment. It was knowledge that paid handsome dividends later.

  13. Proceedings of the Digital/Electronic Terrain Board Symposium Held in Wichita, Kansas on 5-6 October 1989

    DTIC Science & Technology

    1990-02-01

    Representative is Mr. H. C. Race, AMC Smart Weapons Management Office, ATTN: AMSMI-SW, Redstone Arsenal, Alabama 35898- 5222. Reproduction. Permission to...reproduce any material contained in this document must be requested and approved in writing by the AMC Smart Weapons Management Office, AMSMI-SW, Redstone...elevation points, necessitating a large geometric data base that requires heavy computation loads for rendering. The second innovative technique is the

  14. The Shock Vibration Bulletin. Part 3. Isolation and Damping, Vibration Test Criteria, and Vibration Analysis and Test

    DTIC Science & Technology

    1987-01-01

    PULLERS AND SEPARATION JOINTS M. J. Evans and V. H. Neubert , The Pennsylvania State Univevsity, University Partk, PA, and L. J. Bement, NASA, Langley...Laboratory, Wshingt’,, DC Wednesday Nondevelopment Mr. James W. Daniel, Mr. Paul Hahn, 15 October, A.M. Items Workshop, U.S. Army Missile Martl.n Marietta...Session i, Command, Orlando Aerospace, Methods Redstone Arseral, AL Orlando, FL Wednesday Structural Mr. Etanley Barrett, Hr. W. Paul Dunn, 15

  15. The George C. Marshall Space Flight Center's 14 X 14-Inch Trisonic Wind Tunnel: A Historical Perspective

    NASA Technical Reports Server (NTRS)

    Springer, A.

    1994-01-01

    A history of the National Aeronautics and Space Administration (NASA) George C. Marshall Space Flight Center's (MSFC) 14 x 14-Inch Trisonic Wind Tunnel is presented. Its early and continuing role in the United States space program is shown through highlights of the tunnel's history and the major programs tested in the tunnel over the past 40 years. The 14-Inch Tunnel has its beginning with the Army in the late 1950's under the Army Ballistic Missile Agency (ABMA). Such programs as the Redstone, Jupiter, Pershing, and early Saturn were tested in the 14-Inch Tunnel in the late 1950's. America's first launch vehicle, the Jupiter C, was designed and developed using the 14-Inch Wind Tunnel. Under NASA, the 14-Inch Wind Tunnel has made large contributions to the Saturn, Space Transportation System, and future launch vehicle programs such as Shuttle-C and the National Launch System. A technical description of the tunnel is presented for background information on the type and capabilities of the 14-Inch Wind Tunnel. The report concludes in stating: the 14-Inch Wind Tunnel as in speed of sound; transonic, at or near the speed of sound the past, will continue to play a large but unseen role in he development of America's space program.

  16. LIFTOFF - MERCURY-REDSTONE (MR)-2 - CAPE

    NASA Image and Video Library

    1961-01-31

    S63-22731 (31 Jan. 1961) --- The launch of the Mercury-Redstone 2 (MR-2) suborbital mission from Cape Canaveral, Florida, on Jan. 31, 1961. Onboard the spacecraft was ?Ham?, a 37-pound chimpanzee. Despite an over-acceleration factor, the flight was considered to be successful. Following recovery Ham appeared to be in good physiological condition, but sometime later when he was shown the Mercury spacecraft it was visually apparent that he had no further interest in cooperating with the spaceflight program. Photo credit: NASA

  17. Bibliography on Metrication, January 1977 to August 1989

    DTIC Science & Technology

    1990-08-01

    X.L. 109 Guist, Althea R . 460 Gutmann, Fredrick T. 14,291 Hager. Mary 306 Halstead, Bruce B. 188 Hamilton, A.B. 21,303 Hanley, Charles J. 417 Hart, K.C...Scientific Info. Cent IAMSMI-RD-cs- R 6c. ADDRESS (CIty, State, and ZIP Code) 7b. ADDRESS (City, State, and ZIP Code) Commander, U.S. Army Missile Command...Redstone Scientific Information Center AMSMI-RD-CS- R Redstone Arsenal, AL 35898-5241 8a. NAME OF FUNDING/SPONSORING 18b. OFFICE SYMBOL 9. PROCUREMENT

  18. The Testing Behind the Test Facility: the Acoustic Design of the NASA Glenn Research Center's World-Class Reverberant Acoustic Test Facility

    NASA Technical Reports Server (NTRS)

    Hughes, William O.; McNelis, Mark E.; Hozman, Aron D.; McNelis, Anne M.

    2010-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is leading the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC s Plum Brook Station in Sandusky, Ohio, U.S.A. Benham Companies, LLC is currently constructing modal, base-shake sine and reverberant acoustic test facilities to support the future testing needs of NASA s space exploration program. The large Reverberant Acoustic Test Facility (RATF) will be approximately 101,000 ft3 in volume and capable of achieving an empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world s known active reverberant acoustic test facilities. The key to achieving the expected acoustic test spectra for a range of many NASA space flight environments in the RATF is the knowledge gained from a series of ground acoustic tests. Data was obtained from several NASA-sponsored test programs, including testing performed at the National Research Council of Canada s acoustic test facility in Ottawa, Ontario, Canada, and at the Redstone Technical Test Center acoustic test facility in Huntsville, Alabama, U.S.A. The majority of these tests were performed to characterize the acoustic performance of the modulators (noise generators) and representative horns that would be required to meet the desired spectra, as well as to evaluate possible supplemental gas jet noise sources. The knowledge obtained in each of these test programs enabled the design of the RATF sound generation system to confidently advance to its final acoustic design and subsequent ongoing construction.

  19. The Testing Behind The Test Facility: The Acoustic Design of the NASA Glenn Research Center's World-Class Reverberant Acoustic Test Facility

    NASA Technical Reports Server (NTRS)

    Hughes, William O.; McNelis, Mark E.; McNelis, Anne M.

    2011-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is leading the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC?s Plum Brook Station in Sandusky, Ohio, USA. Benham Companies, LLC is currently constructing modal, base-shake sine and reverberant acoustic test facilities to support the future testing needs of NASA?s space exploration program. T he large Reverberant Acoustic Test Facility (RATF) will be approximately 101,000 ft3 in volume and capable of achieving an empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world?s known active reverberant acoustic test facilities. The key to achieving the expected acoustic test spectra for a range of many NASA space flight environments in the RATF is the knowledge gained from a series of ground acoustic tests. Data was obtained from several NASA-sponsored test programs, including testing performed at the National Research Council of Canada?s acoustic test facility in Ottawa, Ontario, Canada, and at the Redstone Technical Test Center acoustic test facility in Huntsville, Alabama, USA. The majority of these tests were performed to characterize the acoustic performance of the modulators (noise generators) and representative horns that would be required to meet the desired spectra, as well as to evaluate possible supplemental gas jet noise sources. The knowledge obtained in each of these test programs enabled the design of the RATF sound generation system to confidently advance to its final acoustic de-sign and subsequent on-going construction.

  20. Proceedings of the Workshop on Millimeter and Submillimeter Atmospheric Propagation Applicable to Radar and Missile Systems, held at Redstone Arsenal, Alabama, 20-22 March 1979

    DTIC Science & Technology

    1980-02-01

    MISSILE SYSTEMS , HELD AT REDSTONE ARSENAL, ALABAMA, It~o 20-22 MARCH 1979 0 Oskar M. Essenwanger Ferary 1980ear ~~U ArmydMissie abraentry Ib ~3801K -w ~ Q...MISSILE SYSTEMS 6. PERFORMINI, ORG. REPORT NUMBER 7AUTHORWe 8. CONTRACT OR GRANT NUMBER(*)~ Dr. Oskar M. Essenwanger and Dr. Dorathy A. Stewart (editors...public release; distribution unlimited. 17. DISTRIBUTION STATEMENT (of the abstract en ~tered In Block 20. if different fromr Report)~ 18. SUPPLEMENTARY

  1. Origin of Marshall Space Flight Center (MSFC)

    NASA Image and Video Library

    1960-09-08

    President Dwight D. Eisenhower and Mrs. George C. Marshall unveil the bronze bust of General George C. Marshall during the dedication of the Marshall Space Flight Center. Eisenhower signed an Executive Order on October 21, 1959 directing the transfer of persornel from the Redstone Arsenal's Army Ballistic Missile Agency Development Operations Division to NASA. On March 15, 1960, another Executive Order announced that the space complex formed within the boundaries of Redstone Arsenal would become the George C. Marshall Space Flight Center. The Center was activated on July 1, 1960, with dedication ceremonies taking place September 8, 1960.

  2. Early Rockets

    NASA Image and Video Library

    1957-03-01

    The Jupiter rocket was designed and developed by the Army Ballistic Missile Agency (ABMA). ABMA launched the Jupiter-A at Cape Canaveral, Florida, on March 1, 1957. The Jupiter vehicle was a direct derivative of the Redstone. The Army Ballistic Missile Agency (ABMA) at Redstone Arsenal, Alabama, continued Jupiter development into a successful intermediate ballistic missile, even though the Department of Defense directed its operational development to the Air Force. ABMA maintained a role in Jupiter RD, including high-altitude launches that added to ABMA's understanding of rocket vehicle operations in the near-Earth space environment. It was knowledge that paid handsome dividends later.

  3. Space Station

    NASA Image and Video Library

    1952-01-01

    This is a von Braun 1952 space station concept. In a 1952 series of articles written in Collier's, Dr. Wernher von Braun, then Technical Director of the Army Ordnance Guided Missiles Development Group at Redstone Arsenal, wrote of a large wheel-like space station in a 1,075-mile orbit. This station, made of flexible nylon, would be carried into space by a fully reusable three-stage launch vehicle. Once in space, the station's collapsible nylon body would be inflated much like an automobile tire. The 250-foot-wide wheel would rotate to provide artificial gravity, an important consideration at the time because little was known about the effects of prolonged zero-gravity on humans. Von Braun's wheel was slated for a number of important missions: a way station for space exploration, a meteorological observatory and a navigation aid. This concept was illustrated by artist Chesley Bonestell.

  4. Archeological Test Excavations at the Proposed Dry Boat Storage Facility and Archeological Survey of the Neal Road Extension Corridor, Redstone Arsenal, Huntsville, Alabama

    DTIC Science & Technology

    1991-11-19

    economy with a primary emphasis on the exploitation of now extinct megafauna (Gardner 1974, Goodyear et al. 1979, Martin and Klein 1984). Evidence...associated with the rapidly changing Early Holocene environments and animal populations. While exploitation of megafauna during the Early Paleoindian Period...cash- crop economy resulted in the abandonment of old fields once they were depleted of their nutrients and the clearing of new fields. Eventually

  5. Orion Stage Adapter move to Redstone Airfield

    NASA Image and Video Library

    2018-04-03

    NASA's Super Guppy aircraft arrives to the U.S. Army’s Redstone Airfield in Huntsville, Alabama, April 2, to pick up flight hardware for NASA’s Space Launch System – its new, deep-space rocket that will enable astronauts to begin their journey to explore destinations far into the solar system. The Guppy will depart on Tuesday, April 3 to deliver the Orion stage adapter to NASA’s Kennedy Space Center in Florida for flight preparations. On Exploration Mission-1, the first integrated flight of the SLS and the Orion spacecraft, the adapter will connect Orion to the rocket and carry 13 CubeSats as secondary payloads.

  6. Orion Stage Adapter move to Redstone Airfield

    NASA Image and Video Library

    2018-04-02

    Caption: NASA's Super Guppy aircraft arrives to the U.S. Army’s Redstone Airfield in Huntsville, Alabama, April 2, to pick up flight hardware for NASA’s Space Launch System – its new, deep-space rocket that will enable astronauts to begin their journey to explore destinations far into the solar system. The Guppy will depart on Tuesday, April 3 to deliver the Orion stage adapter to NASA’s Kennedy Space Center in Florida for flight preparations. On Exploration Mission-1, the first integrated flight of the SLS and the Orion spacecraft, the adapter will connect Orion to the rocket and carry 13 CubeSats as secondary payloads.

  7. Engineering Management Capstone Project EM 697: Compare and Contrast Risk Management Implementation at NASA and the US Army

    NASA Technical Reports Server (NTRS)

    Brothers, Mary Ann; Safie, Fayssal M. (Technical Monitor)

    2002-01-01

    NASA at Marshall Space Flight Center (MSFC) and the U.S. Army at Redstone Arsenal were analyzed to determine whether they were successful in implementing their risk management program. Risk management implementation surveys were distributed to aid in this analysis. The scope is limited to NASA S&MA (Safety and Mission Assurance) at MSFC, including applicable support contractors, and the US Army Engineering Directorate, including applicable contractors, located at Redstone Arsenal. NASA has moderately higher risk management implementation survey scores than the Army. Accordingly, the implementation of the risk management program at NASA is considered good while only two of five of the survey categories indicated that the risk management implementation is good at the Army.

  8. Early Rockets

    NASA Image and Video Library

    1958-01-31

    Launch of Jupiter-C/Explorer 1 at Cape Canaveral, Florida on January 31, 1958. After the Russian Sputnik 1 was launched in October 1957, the launching of an American satellite assumed much greater importance. After the Vanguard rocket exploded on the pad in December 1957, the ability to orbit a satellite became a matter of national prestige. On January 31, 1958, slightly more than four weeks after the launch of Sputnik.The ABMA (Army Ballistic Missile Agency) in Redstone Arsenal, Huntsville, Alabama, in cooperation with the Jet Propulsion Laboratory, launched a Jupiter from Cape Canaveral, Florida. The rocket consisted of a modified version of the Redstone rocket's first stage and two upper stages of clustered Baby Sergeant rockets developed by the Jet Propulsion Laboratory and later designated as Juno boosters for space launches

  9. Launch, Jupiter-C, Explorer 1

    NASA Technical Reports Server (NTRS)

    1958-01-01

    Launch of Jupiter-C/Explorer 1 at Cape Canaveral, Florida on January 31, 1958. After the Russian Sputnik 1 was launched in October 1957, the launching of an American satellite assumed much greater importance. After the Vanguard rocket exploded on the pad in December 1957, the ability to orbit a satellite became a matter of national prestige. On January 31, 1958, slightly more than four weeks after the launch of Sputnik.The ABMA (Army Ballistic Missile Agency) in Redstone Arsenal, Huntsville, Alabama, in cooperation with the Jet Propulsion Laboratory, launched a Jupiter from Cape Canaveral, Florida. The rocket consisted of a modified version of the Redstone rocket's first stage and two upper stages of clustered Baby Sergeant rockets developed by the Jet Propulsion Laboratory and later designated as Juno boosters for space launches

  10. Launch of Jupiter-C/Explorer 1

    NASA Technical Reports Server (NTRS)

    1958-01-01

    Launch of Jupiter-C/Explorer 1 at Cape Canaveral, Florida on January 31, 1958. After the Russian Sputnik 1 was launched in October 1957, the launching of an American satellite assumed much greater importance. After the Vanguard rocket exploded on the pad in December 1957, the ability to orbit a satellite became a matter of national prestige. On January 31, 1958, slightly more than four weeks after the launch of Sputnik.The ABMA (Army Ballistic Missile Agency) in Redstone Arsenal, Huntsville, Alabama, in cooperation with the Jet Propulsion Laboratory, launched a Jupiter from Cape Canaveral, Florida. The rocket consisted of a modified version of the Redstone rocket's first stage and two upper stages of clustered Baby Sergeant rockets developed by the Jet Propulsion Laboratory and later designated as Juno boosters for space launches

  11. Climbing to stars

    NASA Astrophysics Data System (ADS)

    Maksimov, A. I.

    2011-06-01

    Development of cosmonautics and preparation to the first manned space flights are briefly observed. Details of the development of the first Soviet intercontinental ballistic missile R-7, which served as a basis for creating Sputnik, Vostok, Voskhod, Molniya, and Soyuz launchers, are given. The contributions of the outstanding designers of space engineering, W. von Braun, S.P. Korolev, V.P. Glushko, and academician M.V. Keldysh, to the development of astronautics and first manned space missions are demonstrated. A list of test launches and manned flights of Vostok and Mercury spacecrafts and the basic characteristics of Vostok, Redstone, Atlas-D, Voskhod, and Soyuz launchers are presented.

  12. Loading the Saturn I S-IV Stage into Pregnant Guppy

    NASA Technical Reports Server (NTRS)

    1965-01-01

    The photograph shows the loading operation of the Saturn I S-IV stage (second stage) into the Pregnant Guppy at the Redstone Airfield, Huntsville, Alabama. The Pregnant Guppy was a Boeing B-377 Stratocruiser modified to transport various stages of Saturn launch vehicles. The modification project called for lengthening the fuselage to accommodate the S-IV stage. After the flight test of that modification, phase two called for the enlargement of the plane's cabin section to approximately double its normal volume. The fuselage separated just aft of the wing's trailing edge to load and unload the S-IV and other cargoes.

  13. From A-4 to Explorer 1. [U.S. rocket and missile technology historical review

    NASA Technical Reports Server (NTRS)

    Debus, K. H.

    1973-01-01

    Historical review of the development of rocket and missile technology in the United States over the period from 1945 to 1958. Attention is given to the organization of activities, the launch facilities, and the scope of test rocket firings at the White Sands Proving Ground area during the initial phase of research with captured German V2 rockets. The development of the Redstone missiles is outlined by discussing aspects of military involvement, cooperation with industrial suppliers, details of ground support equipment, and results of initial test firings. Subsequent development of the Jupiter missiles is examined in a similar manner, and attention is given to activities involved in the launching of the Explorer 1 satellite.

  14. ACHP | News

    Science.gov Websites

    Search skip specific nav links Home arrow News Internal Revenue Service Wins Chairman's Award for Federal Redstone Castle WASHINGTON, DC-The Internal Revenue Service (IRS) received the Advisory Council on Historic

  15. 32 CFR Appendix B to Part 623 - Approving Authority Addresses/Telephone Numbers *

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...; B-17. Commander, US Army Communications Security, Logistics Agency, ATTN: SELCL-NICP-IM, Fort..., Redstone Arsenal, AL 35809; B-24. Commander, US Army Security Assistance Center, ATTN: DRSAC, 5001...

  16. 32 CFR Appendix B to Part 623 - Approving Authority Addresses/Telephone Numbers *

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...; B-17. Commander, US Army Communications Security, Logistics Agency, ATTN: SELCL-NICP-IM, Fort..., Redstone Arsenal, AL 35809; B-24. Commander, US Army Security Assistance Center, ATTN: DRSAC, 5001...

  17. 32 CFR Appendix B to Part 623 - Approving Authority Addresses/Telephone Numbers *

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...; B-17. Commander, US Army Communications Security, Logistics Agency, ATTN: SELCL-NICP-IM, Fort..., Redstone Arsenal, AL 35809; B-24. Commander, US Army Security Assistance Center, ATTN: DRSAC, 5001...

  18. 32 CFR Appendix B to Part 623 - Approving Authority Addresses/Telephone Numbers *

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...; B-17. Commander, US Army Communications Security, Logistics Agency, ATTN: SELCL-NICP-IM, Fort..., Redstone Arsenal, AL 35809; B-24. Commander, US Army Security Assistance Center, ATTN: DRSAC, 5001...

  19. 32 CFR Appendix B to Part 623 - Approving Authority Addresses/Telephone Numbers *

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...; B-17. Commander, US Army Communications Security, Logistics Agency, ATTN: SELCL-NICP-IM, Fort..., Redstone Arsenal, AL 35809; B-24. Commander, US Army Security Assistance Center, ATTN: DRSAC, 5001...

  20. Around Marshall

    NASA Image and Video Library

    1976-01-06

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was originally designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage. Modifications to the S-IC Test Stand began in 1975 to accommodate space shuttle external tank testing. This photo is of the horizontal liquid oxygen tanks.

  1. Launch of the MR-2 spacecraft

    NASA Technical Reports Server (NTRS)

    1963-01-01

    Launching of the Mercury-Redstone 2 (MR-3) spacecraft from Cape Canaveral on a suborbital mission. Onboard the craft was Ham, a 37-pound chimpanzee. Despite an over-acceleration factor, the flight was considered to be successful.

  2. Wernher von Braun

    NASA Image and Video Library

    1959-01-01

    Marshall Space Flight Center Director Wernher von Braun presents General J.B. Medaris with a new golf bag. General Medaris, (left) was a Commander of the Army Ballistic Missile Agency (ABMA) in Redstone Arsenal, Alabama during 1955 to 1958.

  3. Origin of Marshall Space Flight Center (MSFC)

    NASA Image and Video Library

    1950-01-01

    General Medaris, (left) who was a Commander of the Army Ballistic Missile Agency (ABMA) in Redstone Arsenal, Alabama, during 1955 to 1958, shakes hands with Major General Holger Toftoy (right), who consolidated U.S. missile and rocketry development.

  4. Wernher von Braun

    NASA Image and Video Library

    1959-01-01

    In this picture, Dr. Wernher von Braun, who was serving as Director of the Army Ballistic Missile Agency's (ABMA) Development Operations Division, is shown posed with his Mercedes 220SE automobile in front of Redstone Building 4488, which houses the ABMA.

  5. Astronaut Alan B. Shepard has his blood pressure and temperature checked

    NASA Technical Reports Server (NTRS)

    1961-01-01

    Astronaut Alan B. Shepard has his blood pressure and temperate checked prior to his Mercury-Redstone 3 (MR-3) mission, the first American manned space flight. The attending physician is Dr. William K. Douglas.

  6. KSC-2011-3321

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- The U.S. flag waves proudly in front of a replica of a Mercury-Redstone rocket at Complex 5/6 on Cape Canaveral Air Force Station in Florida. A celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  7. Compact Optical Correlators

    NASA Astrophysics Data System (ADS)

    Gregory, Don A.; Kirsch, James C.

    1989-02-01

    In the past 15 years, a dozen or so designs have been proposed for compact optical correlators. Of these, maybe one-third of them have actually been built and only a few of those tested. This paper will give an overview of some of the systems that have been built as well as mention some promising early and current designs that have not been built. The term compact, as used in the title of this paper, will be applied very loosely; to mean smaller than a laboratory size optical table. To date, only one correlator has been built and tested that actually can be called miniature. This softball size correlator was built by the Perkin-Elmer Corporation for the U. S. Army Missile Command at Redstone Arsenal, Alabama. More will be said about this correlator in following sections.

  8. Huntsville Arsenal for Sale

    NASA Technical Reports Server (NTRS)

    1940-01-01

    In the years following World War II, the Army directed that the Huntsville, Alabama Arsenal be advertised for sale. The decision was reversed because the Army found it needed this land for the new missile work that would occur at Redstone Arsenal.

  9. Helicopter lifts Grissom from water

    NASA Technical Reports Server (NTRS)

    1961-01-01

    Marine helicopter has astronaut Virgil I. Grissom in harness and is bringing him up out of the water. The Liberty Bell 7 spacecraft has just sunk below the water. His Mercury-Redstone 4 launch was the second in the U.S. manned space effort.

  10. Director von Braun Presents General Medaris With Golf Bag

    NASA Technical Reports Server (NTRS)

    1959-01-01

    Marshall Space Flight Center Director Wernher von Braun presents General J.B. Medaris with a new golf bag. General Medaris, (left) was a Commander of the Army Ballistic Missile Agency (ABMA) in Redstone Arsenal, Alabama during 1955 to 1958.

  11. Origin of Marshall Space Flight Center (MSFC)

    NASA Image and Video Library

    1940-01-01

    In the years following World War II, the Army directed that the Huntsville, Alabama Arsenal be advertised for sale. The decision was reversed because the Army found it needed this land for the new missile work that would occur at Redstone Arsenal.

  12. International Space Station (ISS)

    NASA Image and Video Library

    2000-07-01

    The 45-foot, port-side (P1) truss segment flight article for the International Space Station is being transported to the Redstone Airfield, Marshall Space Flight Center. The truss will be loaded aboard NASA's Super Guppy cargo plane for shipment to the Kennedy Space Center.

  13. Wernher von Braun

    NASA Image and Video Library

    1959-01-01

    Five of the seven original astronauts are seen with Dr. von Braun inspecting the Mercury-Redstone hardware in the Fabrication Laboratory of Army Ballistic Missile Agency (ABMA) in 1959. Left to right: Astronauts Walter Schirra, Alan Shepard, John Glenn, Scott Carpenter, Gordon Cooper, and Dr. von Braun.

  14. SHEPARD, ALAN B., JR. ASTRONAUT - WASHINGTON, DC

    NASA Image and Video Library

    1963-05-06

    S63-06268 (8 May 1963) --- Astronaut Alan B. Shepard, Jr., receives his NASA's Distinguished Service Medal from President John F. Kennedy, after his Mercury-Redstone 3 (MR-3) flight, in a Rose Garden ceremony on May 8, 1961 at the White House.

  15. Mercury Project

    NASA Image and Video Library

    1959-04-27

    Astronaut Virgil I. "Gus" Grissom, one of the original seven astronauts for Mercury Project selected by NASA on April 27, 1959. The MR-4 mission, boosted by the Mercury-Redstone vehicle, made the second marned suborbital flight. The capsule, Liberty Bell 7, sank into the sea after the splashdown.

  16. Mercury Project

    NASA Image and Video Library

    1963-09-09

    Astronaut Alan B. Shepard, one of the original seven astronauts for Mercury Project selected by NASA on April 27, 1959. The Freedom 7 spacecraft boosted by Mercury-Redstone vehicle for the MR-3 mission made the first marned suborbital flight and Astronaut Shepard became the first American in space.

  17. Pulsed Laser Device Development Program. Volume 3. ABEL II (Air- Breathing Electric Laser II) Small-Scale Flow Test Report

    DTIC Science & Technology

    1981-06-01

    about 0.18 x 104 f or X 5260 A. 4.3 EFFECT OF FLOW PLATE In this series of experiments, we studied the effect of a screen positioned over the orifice... 104 Ŕ 0 A -03 -0.2 -0.1 0 0.1 0.2 0.3 RaU1 U2 WR I+u 2 J9683 Figure 14 Effect of Shear on Phase Aberration; = 5260 .• 42 -AVCO EVERETT in Fiue1; 56...US Army Missile Command Redstone Arsenal, AL 35898 Attn: DRSMI- RHB , Dr. T.A. Roberts RHE, Mr. J.C. Walters - RHC, Mr. K. Smith RHC, Mr. Myron Cole

  18. High-Pressure Systems Suppress Fires in Seconds

    NASA Technical Reports Server (NTRS)

    2012-01-01

    Much deserved attention is given to the feats of innovation that allow humans to live in space and robotic explorers to beam never-before-seen images back to Earth. In the background of these accomplishments is a technology that makes it all possible the rockets that propel NASA s space exploration efforts skyward. Marshall Space Flight Center has been at the heart of the Agency s rocketry and spacecraft propulsion efforts since its founding in 1960. Located at the Redstone Arsenal near Huntsville, Alabama, the Center has a legacy of success stretching back to the Saturn rockets that carried the Apollo astronauts into space. Even before Marshall was established, Redstone was the site of significant advances in American rocketry under the guidance of famous rocket engineer Werner Von Braun; these included the Juno I rocket that successfully carried the United States first satellite, Explorer 1, into orbit in 1958. And from the first orbital test flight of the Space Shuttle Columbia through the final flights of the shuttle program this year, these vehicles have been enabled by the solid rocket boosters, external tank, and orbiter main engines created at Marshall. Today, Marshall continues to host innovation in rocket and spacecraft propulsion at state-of-the-art facilities such as the Propulsion Research Laboratory. Like many of its past successes, some of the Center s current advancements are being made with the help of private industry partners. The efforts have led not only to new propulsion technologies, but to terrestrial benefits in a seemingly unrelated field in this case, firefighting.

  19. KSC-2011-3330

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- More than 200 workers from the original Mercury program pose for a group photo in front of a replica of a Mercury-Redstone rocket during a celebration at Complex 5/6 on Cape Canaveral Air Force Station in Florida. The celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  20. History of Manned Space Flight

    NASA Technical Reports Server (NTRS)

    1975-01-01

    U.S. manned space projects from Mercury Redstone 3 through Skylab 4 are briefly described including dates, flight duration, crew, and number of earth/moon orbits. The flight costs of each project are itemized. Highlights in the history of the manned space program from 1957 to February, 1974 are included.

  1. Integrated Services Digital Network

    DTIC Science & Technology

    1992-01-01

    users. " Pair Gain • ISDN’s capability to deliver multiple communications channels over a limited set of wires (as in 2B+D service or pasive bus...configuration commands to devices encountered in a communications path, is not yet a reality at Redstone. But for that matter , transparent connectivity

  2. Mercury Project

    NASA Image and Video Library

    1961-07-21

    A U.S. Marine helicopter attempts to retrieve the sinking capsule, Liberty Bell 7, of the MR-4 mission. The attempt failed and the capsule sank. The MR-4 mission marned by Astronaut Virgil Grissom was the second manned orbital flight boosted by the Mercury-Redstone vehicle. The Recovery ship is in the background.

  3. Dr. von Braun With Five of the Original Astronauts

    NASA Technical Reports Server (NTRS)

    1959-01-01

    Five of the seven original astronauts are seen with Dr. von Braun inspecting the Mercury-Redstone hardware in the Fabrication Laboratory of Army Ballistic Missile Agency (ABMA) in 1959. Left to right: Astronauts Walter Schirra, Alan Shepard, John Glenn, Scott Carpenter, Gordon Cooper, and Dr. von Braun.

  4. Integrated Component Fluidic Servovalves and Position Control Systems

    DTIC Science & Technology

    1983-04-01

    35807 ATTN DRSMI- RG , WILLIAM GRIFFITHATTN DRSMI-TGC, J. C. DUNAWAY ATTN DRCPM-TOE, FRED J. CHEPLEN REDSTONE ARSENAL, AL 35898 77 hyJ DISTRIBUT10N (Cont...ARMY TANK AUTOMOTIVE COMMAND ARMOR & COOP DIV, DRDTA-RKT COMMANDER BLDG 215 NAVAL SHIP ENGINEERING CESTER ATTN K. WHITMORE PHILADELPHIA DIVISION WARREN

  5. April 2017 Marshall Association luncheon with Madison mayor Paul

    NASA Image and Video Library

    2017-03-03

    Markeeva Morgan, SLS avionics subsystem manager at NASA’s Marshall Space Flight Center, speaks to an audience of Marshall team members April 26 at the Overlook at Redstone. Morgan was the introductory speaker for the luncheon meeting of the Marshall Association, the center’s professional, employee service organization.

  6. Development of One-Dimensional Dielectric and Metal-Dielectric Photonic Band Gap for Optical Switching and Limiting Applications

    DTIC Science & Technology

    2006-10-10

    principal investigator, Dr. Michael Scalora (Redstone Arsenal, Huntsville, AL (USA). During the first three months we investigated some devices based on...X. Alvarez-Mico, R. Gomez-Bombarelli, M. Cappeddu, M. Scalora , M.J. Bloemer, submitted to Applied Physics Letters.

  7. Astronaut Alan B. Shepard has his blood pressure and temperature checked

    NASA Image and Video Library

    1961-01-01

    S61-02740 (5 May 1961) --- Astronaut Alan B. Shepard Jr. has his heart rate checked prior to his Mercury-Redstone 3 (MR-3) mission, the first American manned suborbital spaceflight. The attending physician is Dr. William K. Douglas. Photo credit: NASA or National Aeronautics and Space Administration

  8. Early Rockets

    NASA Image and Video Library

    1944-01-01

    German technicians stack the various stages of the V-2 rocket in this undated photograph. The team of German engineers and scientists who developed the V-2 came to the United States at the end of World War II and worked for the U. S. Army at Fort Bliss, Texas, and Redstone Arsenal in Huntsville, Alabama.

  9. An Archeological Overview and Management Plan for the Redstone Arsenal, Madison County, Alabama.

    DTIC Science & Technology

    1985-07-29

    Sheet extended into the Great Lakes Region. A pronounced gradient in climate and vegetation coincided with the position of the oak-hickory-southern...between neighboring bands. Food was obtained by hunting and gathering and, although Paleo-Indians may have exploited megafauna , Walthall (1980:35-37

  10. Early Rockets

    NASA Image and Video Library

    1940-01-01

    In this undated file photo, probably from World War II, a V-2 rocket emerges from its camouflaged shelter. The team of German engineers and scientists who developed the V-2 came to the United States after World War II and worked for the U. S. Army at Fort Bliss, Texas and Redstone Arsenal in Huntsville, Alabama.

  11. Astronaut Alan B. Shepard has his blood pressure and temperature checked

    NASA Technical Reports Server (NTRS)

    1961-01-01

    Astronaut Alan B. Shepard has a thermometer in his mouth to check his temperature checked prior to his Mercury-Redstone 3 (MR-3) mission, the first American manned suborbital space flight (02739); Shepard has his heart rate checked. The attending physician is Dr. William K. Douglas (02740).

  12. NASA Marshall Space Flight Center Controls Systems Design and Analysis Branch

    NASA Technical Reports Server (NTRS)

    Gilligan, Eric

    2014-01-01

    Marshall Space Flight Center maintains a critical national capability in the analysis of launch vehicle flight dynamics and flight certification of GN&C algorithms. MSFC analysts are domain experts in the areas of flexible-body dynamics and control-structure interaction, thrust vector control, sloshing propellant dynamics, and advanced statistical methods. Marshall's modeling and simulation expertise has supported manned spaceflight for over 50 years. Marshall's unparalleled capability in launch vehicle guidance, navigation, and control technology stems from its rich heritage in developing, integrating, and testing launch vehicle GN&C systems dating to the early Mercury-Redstone and Saturn vehicles. The Marshall team is continuously developing novel methods for design, including advanced techniques for large-scale optimization and analysis.

  13. Astronaut Alan B. Shepard has his blood pressure and temperature checked

    NASA Image and Video Library

    1961-01-01

    S61-02749 (5 May 1961) --- Astronaut Alan B. Shepard Jr. has his blood pressure and temperature checked prior to his Mercury-Redstone 3 (MR-3) mission, the first American manned spaceflight. The attending physician is Dr. William K. Douglas. Photo credit: NASA or National Aeronautics and Space Administration

  14. Early Rockets

    NASA Image and Video Library

    1959-05-28

    On May 28, 1959, a Jupiter Intermediate Range Ballistic Missile provided by a U.S. Army team in Redstone Arsenal, Alabama, launched a nose cone carrying Baker, A South American squirrel monkey and Able, An American-born rhesus monkey. This photograph shows Able after recovery of the nose cone of the Jupiter rocket by U.S.S. Kiowa.

  15. Astronaut - Shepard - MR-3

    NASA Image and Video Library

    1961-01-01

    S61-02785 (5 May 1961) --- Astronaut Alan B. Shepard Jr. in his pressure suit is seated in a reclining chair while a technician checks communications equipment in his helmet. He is in the suiting trailer before the Mercury-Redstone 3 (MR-3) flight, the first American manned spaceflight. Photo credit: NASA or National Aeronautics and Space Administration

  16. Wernher von Braun

    NASA Image and Video Library

    1954-07-01

    Dr. Wernher von Braun (center), then Chief of the Guided Missile Development Division at Redstone Arsenal, Alabama, discusses a "bottle suit" model with Dr. Heinz Haber (left), an expert on aviation medicine, and Willey Ley, a science writer on rocketry and space exploration. The three men were at the Disney studios appearing in the motion picture, entitled "Man in Space."

  17. 77 FR 59646 - Notice of Inventory Completion: U.S. Department of Defense, Army Garrison, Redstone Arsenal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-28

    ... Indians in Oklahoma. History and Description of the Remains In March 1978, human remains representing, at... minimum, one individual were removed by New World Research, Inc. during a reconnaissance level cultural..., 18 fragmentary pieces of human bone representing one adult of indeterminate sex were recovered from a...

  18. Early Rockets

    NASA Image and Video Library

    1958-01-31

    This illustration shows the main characteristics of the Jupiter C launch vehicle and its payload, the Explorer I satellite. The Jupiter C, America's first successful space vehicle, launched the free world's first scientific satellite, Explorer 1, on January 31, 1958. The four-stage Jupiter C measured almost 69 feet in length. The first stage was a modified liquid fueled Redstone missile. This main stage was about 57 feet in length and 70 inches in diameter. Fifteen scaled down SERGENT solid propellant motors were used in the upper stages. A "tub" configuration mounted on top of the modified Redstone held the second and third stages. The second stage consisted of 11 rockets placed in a ring formation within the tub. Inserted into the ring of second stage rockets was a cluster of 3 rockets making up the third stage. A fourth stage single rocket and the satellite were mounted atop the third stage. This "tub", all upper stages, and the satellite were set spirning prior to launching. The complete upper assembly measured 12.5 feet in length. The Explorer I carried the radiation detection experiment designed by Dr. James Van Allen and discovered the Van Allen Radiation Belt.

  19. Orion Stage Adapter move to Redstone Airfield

    NASA Image and Video Library

    2018-04-03

    NASA's Super Guppy aircraft arrives to the U.S. Army’s Redstone Airfield in Huntsville, Alabama, April 2, to pick up flight hardware for NASA’s Space Launch System – its new, deep-space rocket that will enable astronauts to begin their journey to explore destinations far into the solar system. The Guppy will depart on Tuesday, April 3 to deliver the Orion stage adapter to NASA’s Kennedy Space Center in Florida for flight preparations. On Exploration Mission-1, the first integrated flight of the SLS and the Orion spacecraft, the adapter will connect Orion to the rocket and carry 13 CubeSats as secondary payloads. Rumaasha Maasha, an aerospace engineer in Marshall's Spacecraft & Vehicle Systems Department, tours the cockpit of NASA's Super Guppy aircraft April 3 when it landed at Marshall to pick up the Orion stage adapter for transportation to NASA's Kennedy Space Center. Maasha holds a master's degree in aerospace engineering, is a certified aviation maintenance tech and pilot and previously worked as a 747 loadmaster and airline refueler.

  20. Orion Stage Adapter move to Redstone Airfield

    NASA Image and Video Library

    2018-04-03

    NASA's Super Guppy aircraft arrives to the U.S. Army’s Redstone Airfield in Huntsville, Alabama, April 2, to pick up flight hardware for NASA’s Space Launch System – its new, deep-space rocket that will enable astronauts to begin their journey to explore destinations far into the solar system. The Guppy will depart on Tuesday, April 3 to deliver the Orion stage adapter to NASA’s Kennedy Space Center in Florida for flight preparations. On Exploration Mission-1, the first integrated flight of the SLS and the Orion spacecraft, the adapter will connect Orion to the rocket and carry 13 CubeSats as secondary payloads. Rumaasha Maasha stands in front of the Orion stage adapter in the cargo hold of NASA's Super Guppy aircraft. The Orion stage adapter, the top of the rocket that connects the Space Lauch System to Orion, will carry 13 CubeSats as secondary payloads on Exploration Mission-1, the first integrated flight of SLS and the Orion spacecraft. Guppy transported the adapter to Kennedy Space Center April 3.

  1. Twelve Scientific Specialists of the Peenemuende Team

    NASA Technical Reports Server (NTRS)

    2004-01-01

    Twelve scientific specialists of the Peenemuende team at the front of Building 4488, Redstone Arsenal, Huntsville, Alabama. They led the Army's space efforts at ABMA before transfer of the team to National Aeronautic and Space Administration (NASA), George C. Marshall Space Flight Center (MSFC). (Left to right) Dr. Ernst Stuhlinger, Director, Research Projects Office; Dr. Helmut Hoelzer, Director, Computation Laboratory: Karl L. Heimburg, Director, Test Laboratory; Dr. Ernst Geissler, Director, Aeroballistics Laboratory; Erich W. Neubert, Director, Systems Analysis Reliability Laboratory; Dr. Walter Haeussermarn, Director, Guidance and Control Laboratory; Dr. Wernher von Braun, Director Development Operations Division; William A. Mrazek, Director, Structures and Mechanics Laboratory; Hans Hueter, Director, System Support Equipment Laboratory;Eberhard Rees, Deputy Director, Development Operations Division; Dr. Kurt Debus, Director Missile Firing Laboratory; Hans H. Maus, Director, Fabrication and Assembly Engineering Laboratory

  2. Origin of Marshall Space Flight Center (MSFC)

    NASA Image and Video Library

    2004-04-15

    Twelve scientific specialists of the Peenemuende team at the front of Building 4488, Redstone Arsenal, Huntsville, Alabama. They led the Army's space efforts at ABMA before transfer of the team to National Aeronautic and Space Administration (NASA), George C. Marshall Space Flight Center (MSFC). (Left to right) Dr. Ernst Stuhlinger, Director, Research Projects Office; Dr. Helmut Hoelzer, Director, Computation Laboratory: Karl L. Heimburg, Director, Test Laboratory; Dr. Ernst Geissler, Director, Aeroballistics Laboratory; Erich W. Neubert, Director, Systems Analysis Reliability Laboratory; Dr. Walter Haeussermarn, Director, Guidance and Control Laboratory; Dr. Wernher von Braun, Director Development Operations Division; William A. Mrazek, Director, Structures and Mechanics Laboratory; Hans Hueter, Director, System Support Equipment Laboratory;Eberhard Rees, Deputy Director, Development Operations Division; Dr. Kurt Debus, Director Missile Firing Laboratory; Hans H. Maus, Director, Fabrication and Assembly Engineering Laboratory

  3. Simple Computation of the Heat of Formation and Density from Theoretically Predicted Values

    DTIC Science & Technology

    2012-09-01

    ARSENAL AL 35898-5249 2 US ARMY AVN & MIS CMND ATTN AMSRD AMR PS PT L PLEDGER ATTN AMSRD AMR PS PT M MORRISON BLDG 7120...REDSTONE ARSENAL AL 35898 2 US ARMY AVN & MIS CMND ATTN AMSRD ARL PS PT G DRAKE ATTN AMSRD ARL PS PT N MATHIS BLDG 7120

  4. Attempted Recovery of Mercury spacecraft at end of MR-4 mission

    NASA Image and Video Library

    1961-07-21

    S61-02817 (21 July 1961) --- Attempted recovery of Mercury spacecraft at end of the Mercury-Redstone 4 (MR-4) mission. View shows the Marine helicopter pulled almost to the waters surface by the weight of the capsule, which filled with water. Behind the Marine helicopter, a Navy helicopter prepares to assist. Photo credit: NASA

  5. 78 FR 63460 - Government Owned Invention Available for Licensing, United States Patent, No. 7,837,654, Issued...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... Delivery Device for Promoting Healing in Living Tissue'' AGENCY: Department of the Army, DoD. SUMMARY: The...,837,654 for ''Precision Sensing and Treatment Delivery Device for Promoting Healing in Living Tissue... Development and Engineering Command, ATTN: RDMR-S3I-CST, Bldg 5400, Redstone Arsenal, AL 35898- 5000. FOR...

  6. Present Capability of Ram Air-Driven Alternators Developed at HDL as Fuze Power Supplies

    DTIC Science & Technology

    1983-07-01

    DRCPI-HD, HELLFIRE/GLD FT MONMOUTH, NJ 07703 ATTN DRCPM-PEv PERSHING ATTN DRCPM-DT, TOM DRAGON DIRECTOR REDSTONE ARSENAL, AL 35809 ELECTRONICS TECHNOLOGY...00211 ATTN G. POPE, 00211 ATTN C. LANHAM, 00213 ATTi C. SPYROPOULOS, 22100 ATTN P. INGERSOLL, 34000 ATTN J. BEARD , 34200 ATn D. BROGU., 34300 I ATTN

  7. Analytical Design of Terminally Guided Missiles.

    DTIC Science & Technology

    1980-01-02

    Equivalent Dominant Poles and Zeros Using Industrial Specifications," Trans. on Industrial Electronics and Control Instrumentation, Vol. IECI-26, No...The relaxation of the sampling period requirement and the flexibility of our new method facilitate the practical industrial implementation and...with the Guidance and Control Directorate, U.S. Army Missile Command, Redstone Arsenal, Alabama 35809. I. INTRODUCTION Most practical industrial circuits

  8. Early Rockets

    NASA Image and Video Library

    1958-01-31

    Explorer 1 atop a Jupiter-C in gantry. Jupiter-C carrying the first American satellite, Explorer 1, was successfully launched on January 31, 1958. The Jupiter-C launch vehicle consisted of a modified version of the Redstone rocket's first stage and two upper stages of clustered Baby Sergeant rockets developed by the Jet Propulsion Laboratory and later designated as Juno boosters for space launches

  9. "Redstone Is Like Electricity": Children's Performative Representations in and around "Minecraft"

    ERIC Educational Resources Information Center

    Dezuanni, Michael; O'Mara, Joanne; Beavis, Catherine

    2015-01-01

    This article investigates 8-and 9-year-old girls' use of the popular game "Minecraft" at home and school, particularly the ways in which they performatively "bring themselves into being" through talk and digital production in the social spaces of the classroom and within the game's multiplayer online world. We explore how the…

  10. Capabilities of the Impact Testing Facility at Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Finchum, Andy; Nehls, Mary; Young, Whitney; Gray, Perry; Suggs, Bart; Lowrey, Nikki M.

    2011-01-01

    The test and analysis capabilities of the Impact Testing Facility at NASA's Marshall Space Flight Center are described. Nine different gun systems accommodate a wide range of projectile and target sizes and shapes at velocities from subsonic through hypersonic, to accomplish a broad range of ballistic and hypervelocity impact tests. These gun systems include ballistic and microballistic gas and powder guns, a two-stage light gas gun, and specialty guns for weather encounter studies. The ITF "rain gun" is the only hydrometeor impact gun known to be in existence in the United States that can provide single impact performance data with known raindrop sizes. Simulation of high velocity impact is available using the Smooth Particle Hydrodynamic Code. The Impact Testing Facility provides testing, custom test configuration design and fabrication, and analytical services for NASA, the Department of Defense, academic institutions, international space agencies, and private industry in a secure facility located at Marshall Space Flight Center, on the US Army's Redstone Arsenal in Huntsville, Alabama. This facility performs tests that are subject to International Traffic in Arms Regulations (ITAR) and DoD secret classified restrictions as well as proprietary and unrestricted tests for civil space agencies, academic institutions, and commercial aerospace and defense companies and their suppliers.

  11. 77 FR 50089 - Notice of Intent To Grant Exclusive License of the United States Patent No. 7,837,654 B2, Issued...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... Delivery Device for Promoting Healing in Living Tissue AGENCY: Department of the Army, DoD. ACTION: Notice... & Engineering Center, Attn: RDMR-CST (Dr. J.R. Alexander), 5400 Fowler Road, Redstone Arsenal, Alabama 35898... claims a microneedle insertable in a target cell tissue, including a manipulative end maintained exterior...

  12. Early Rockets

    NASA Image and Video Library

    1943-01-01

    In this photograph from the fall of 1943, German technicians wire vehicles for mobile V-2 batteries in an abandoned railroad turnel in the Rhineland. The team of German engineers and scientists who developed the V-2 came to the United States at the end of World War II and worked for the U. S. Army at Fort Bliss, Texas, and Redstone Arsenal in Huntsville, Alabama.

  13. Students Participate in Rocket Launch Project

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Filled with anticipation, students from three Huntsville area high schools: Randolph, Sparkman, and Johnson High Schools, counted down to launch the rockets they designed and built at the Army test site on Redstone Arsenal in Huntsville, Alabama. The projected two-mile high launch culminated more than a year's work and demonstrated the student team's ability to meet the challenge set by the Marshall Space Flight Center's (MSFC) Student Launch Initiative (SLI) program to apply science and math to experience, judgment, and common sense, and proved to NASA officials that they have successfully built reusable launch vehicles (RLVs), another challenge set by NASA's SLI program. MSFC's SLI program is an educational effort that aims to motivate students to pursue careers in science, math, and engineering. It provides them with hands-on, practical aerospace experience. In this picture, three Sparkman High School students pose with their rocket.

  14. Students Participate in Rocket Launch Project

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Filled with anticipation, students from three Huntsville area high schools: Randolph, Sparkman and Johnson High Schools, counted down to launch the rockets they designed and built at the Army test site on Redstone Arsenal in Huntsville, Alabama. The projected two-mile high launch culminated more than a year's work and demonstrated the student team's ability to meet the challenge set by the Marshall Space Flight Center's (MSFC) Student Launch Initiative (SLI) program to apply science and math to experience, judgment, and common sense, and proved to NASA officials that they have successfully built reusable launch vehicles (RLVs), another challenge set by NASA's SLI program. MSFC's SLI program is an educational effort that aims to motivate students to pursue careers in science, math, and engineering. It provides them with hands-on, practical aerospace experience. In this picture, two Johnson High School students pose with their rocket.

  15. Around Marshall

    NASA Image and Video Library

    2002-04-27

    Filled with anticipation, students from three Huntsville area high schools: Randolph, Sparkman, and Johnson High Schools, counted down to launch the rockets they designed and built at the Army test site on Redstone Arsenal in Huntsville, Alabama. The projected two-mile high launch culminated more than a year's work and demonstrated the student team's ability to meet the challenge set by the Marshall Space Flight Center's (MSFC) Student Launch Initiative (SLI) program to apply science and math to experience, judgment, and common sense, and proved to NASA officials that they have successfully built reusable launch vehicles (RLVs), another challenge set by NASA's SLI program. MSFC's SLI program is an educational effort that aims to motivate students to pursue careers in science, math, and engineering. It provides them with hands-on, practical aerospace experience. In this picture, three Sparkman High School students pose with their rocket.

  16. Around Marshall

    NASA Image and Video Library

    2002-04-27

    Filled with anticipation, students from three Huntsville area high schools: Randolph, Sparkman, and Johnson High Schools, counted down to launch the rockets they designed and built at the Army test site on Redstone Arsenal in Huntsville, Alabama. The projected two-mile high launch culminated more than a year's work and demonstrated the student team's ability to meet the challenge set by the Marshall Space Flight Center's (MSFC) Student Launch Initiative program to apply science and math to experience, judgment, and common sense, and proved to NASA officials that they have successfully built reusable launch vehicles (RLVs), another challenge set by NASA's SLI program. MSFC's SLI program is an educational effort that aims to motivate students to pursue careers in science, math, and engineering. It provides hands-on, practical aerospace experience. In this picture, a rocket built by Johnson High School students soars to it projected designation.

  17. Around Marshall

    NASA Image and Video Library

    2002-04-27

    Filled with anticipation, students from three Huntsville area high schools: Randolph, Sparkman and Johnson High Schools, counted down to launch the rockets they designed and built at the Army test site on Redstone Arsenal in Huntsville, Alabama. The projected two-mile high launch culminated more than a year's work and demonstrated the student team's ability to meet the challenge set by the Marshall Space Flight Center's (MSFC) Student Launch Initiative (SLI) program to apply science and math to experience, judgment, and common sense, and proved to NASA officials that they have successfully built reusable launch vehicles (RLVs), another challenge set by NASA's SLI program. MSFC's SLI program is an educational effort that aims to motivate students to pursue careers in science, math, and engineering. It provides them with hands-on, practical aerospace experience. In this picture, two Johnson High School students pose with their rocket.

  18. Skylab

    NASA Image and Video Library

    1968-01-01

    This photograph was taken at the Redstone airfield, Huntsville, Alabama, during the unloading of the Saturn V S-IVB stage that housed the Orbital Workshop (OWS) from the Super Guppy, the NASA plane that was specially built to carry oversized cargo. The OWS measured 22 feet (6.7 m) in diameter, and 48 feet (14.6 m) in length. The Saturn V S-IVB stage was modified at the McDornell Douglas facility at Huntington Beach, California, for a new role, which was to house the OWS. In addition to the test articles, engineering mockups, and flight equipment, both McDonnell Douglas and Martin Marietta built 0-G trainers, neutral buoyancy trainers, and high-fidelity mockups for the 1-G trainer to be used in the KC-135 aircraft. The Marshall Space Flight Center had program management responsibility for the development of Skylab hardware and experiments.

  19. The Mission Transcript Collection: U.S. Human Spaceflight Missions from Mercury Redstone 3 to Apollo 17

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Aboard every U.S. piloted spacecraft, from Mercury through Apollo, NASA installed tape recorders that captured nearly every word spoken by the astronauts during their history-making flights into space. For the first time ever, NASA has digitally scanned all of the transcripts made from both the onboard tapes and those tape recordings made on the ground from the air-to-ground transmissions and placed them on this two CD-ROM set. Gathered in this special collection are 80 transcripts totaling nearly 45,000 pages of text that cover every US human spaceflight from the first human Mercury mission through the last lunar landing flight of Apollo 17. Users of this CD will note that the quantity and type of transcripts made for each mission vary. For example, the Mercury flights each had one transcript whereas the Gemini missions produced several. Starting with the Gemini flights, NASA produced a Public Affairs Office (PAO) commentary version, as well as at least one "technical" air-to-ground transcript version, per mission. Most of the Apollo missions produced four transcripts per flight. These included the onboard voice data recorder transcripts made from the Data Storage Equipment (DSE) on the Command Module (CM), and the Data Storage Electronics Assembly (DSEA) onboard the Lunar Module (LM), in addition to the PAO commentary and air-to-ground technical transcripts. The CD set includes an index listing each transcript file by name. Some of the transcripts include a detailed explanation of their contents and how they were made. Also included in this collection is a listing of all the original air-to-ground audiotapes housed in NASA's archives from which many of these transcripts were made. We hope you find this collection of transcripts interesting and useful.

  20. Scout

    NASA Image and Video Library

    1960-09-22

    Photographed on 09/22/1960. -- An examination of the Aerojet-General "Aerobee 150A" propulsion system in February 1960. James Hansen described this as follows: "As for the technical definition of the rocket...the Langley engineers tried to keep developmental costs and time to a minimum by selecting components from off-the-shelf hardware. the majority of Scout's components were to come from an inventory of solid-fuel rockets produced for the military, although everyone involved understood that some improved motors would also have to be developed under contract. By early 1959, after intensive technical analysis and reviews, Langley settled on a design and finalized the selection of the major contractors. The rocket's 40-inch-diameter first stage was to be a new "Algol" motor, a combination of the Jupiter Senior and the navy Polaris produced by the Aerojet General Corporation, Sacramento, California. The 31-inch-diameter second stage, "Castor," was derived from the army's Sergeant and was to be manufactured by the Redstone Division of the Thiokol company in Huntsville, Alabama. the motor for the 30-inch-diameter third stage, "Antares," evolved under NASA contract from the ABL X248 design into a new version called the X254 (and subsequently into the X259); it was built under contract to NASA by ABL, a U.S. Navy Bureau of Ordnance facility operated by the Hercules Powder Company, Cumberland, Maryland. the final upper-stage propulsion unit, "Altair," which was 25.7 inches in diameter (34 inches at the heat shield), amounted to an improved edition of the X248 that was also manufactured by ABL." -- Published in James R. Hansen, Spaceflight Revolution: NASA Langley Research Center From Sputnik to Apollo, NASA SP-4308, pp.200-201.

  1. Installation Restoration Program Management Plan

    DTIC Science & Technology

    1999-03-01

    Proving Ground Dugway Proving Ground White Sands Missile Range Yuma Proving Ground Aviation Missile Command Redstone Arsenal Letterkenny Army Depot...approved for Public Release DUC QUALITY INSPECTED 3 REPLY TO ATTENTION OF DEPARTMENT OF THE ARMY U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING GROUND ...environmental documents. The TIC is located at the USAEC at Aberdeen Proving Ground , MD. If an installation or MACOM/MSC is not aware of

  2. Defense Infrastructure: The Enhanced Use Lease Program Requires Management Attention

    DTIC Science & Technology

    2011-06-01

    included in our EUL case studies, the escrow agreements executed by the Army in connection with the EUL at Yuma Proving Ground , Arizona, and the EUL at...research park. 6 Army Redstone Arsenal, Alabama 2009 50 468 acres Site for office and research center development. 7 Army Yuma Proving Ground ...9The three Army EUL case studies were located at Aberdeen Proving Ground , Maryland; Fort

  3. Comprehensive Energy and Water Master Plan, Redstone Arsenal

    DTIC Science & Technology

    2009-01-01

    Facility Energy Decision System (FEDS) analysis completed by the Pacific Northwest National Laboratory ( PNNL ). This model presents a clear picture of...steam options analysis conducted by Pacific Northwest National Laboratory ( PNNL ) giving priority to strategies that maximize the use of waste for...0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing

  4. Early Rockets

    NASA Image and Video Library

    1940-01-01

    The Hermes A-1 rocket was designed by the U. S. Army after capturing the V-2 rocket from the German army at the conclusion of the Second World War. The Hermes A-1 is a modified V-2 rocket; it utilized the German aerodynamic configuration; however, internally it was a completely new design. This rocket was the first designed by the German Rocket Team at Redstone Arsenal in Huntsville, AL.

  5. Origin of Marshall Space Flight Center (MSFC)

    NASA Image and Video Library

    1950-01-01

    As the nations missile and rocket program began to expand in the 50's, Huntsville, Alabama was the home to Redstone Arsenal and the famous team of rocket experts led by Dr. Wernher Von Braun. Soon Huntsville was called the "Rocket City" as depicted in this photo believed to have been taken in the 1950's in Huntsville, Alabama. (Courtesy of Huntsville/Madison County Public Library)

  6. Mercury Project

    NASA Image and Video Library

    1961-05-05

    Dr. von Braun addresses a crowd celebrating in front of the Madison County Alabama Courthouse following the successful launch of Astronaut Alan Shepard (America's first astronaut in space) into space on a Mercury-Redstone Launch Vehicle, Freedom 7. Shepard's Mercury Spacecraft, was launched from Cape Canaveral. He reached a speed of 5200 mph. His flight lasted 15-1/2 minutes. May 5, 1961 (Photo: Courtesy of Huntsville/Madison County Public Library)

  7. Army Contracting: Training and Guidance Needed to Ensure Appropriate Use of the Option to Extend Services Clause

    DTIC Science & Technology

    2016-01-28

    reproduce this material separately. The Government Accountability Office, the audit , evaluation, and investigative arm of...Executive Director Army Contracting Command-Redstone Arsenal Army Contracting: Training and Guidance Needed to Ensure Appropriate Use of the Option to...which this report is based in accordance with generally accepted government auditing standards. Those standards require that we plan and perform the

  8. Mercury Project

    NASA Image and Video Library

    1959-01-01

    Dr. Wernher von Braun, Director of the Army Ballistic Missile Agency's (ABMA) Development Operations Division, poses with the original Mercury astronauts in ABMA's Fabrication Laboratory during a 1959 visit. Inspecting Mercury-Redstone hardware are from left to right, Alan Shepard, Donald Deke Slayton, Virgil Gus Grissom, von Braun, Gordon Cooper, Wally Schirra, John Glenn, and Scott Carpenter. Project Mercury officially began October 7, 1958 as the United States' first manned space program.

  9. Relationships among macerals, minerals, miospores and paleoecology in a column of Redstone coal (Upper Pennsylvanian) from north-central West Virginia (U.S.A.)

    USGS Publications Warehouse

    Grady, W.C.; Eble, C.F.

    1990-01-01

    Two distinct paleoenvironments are represented in vertical succession in a column of Redstone coal in north-central West Virginia as indicated by a study of 37 consecutive 3-cm (0.1 ft) increments analyzed for ash yield, petrographic composition, low-temperature ash mineralogy and palynomorph abundances. Abundance profiles were constructed for ash, 12 petrographic components, 3 minerals and 5 miospore assemblages. The profiles and calculated correlation coefficients show close relationships between several constituents. Components that increased in abundance upward in the coal bed were a collinite type > 50 microns in thickness, cutinite, and miospores affiliated with calamites, herbaceous lycopods, cordaites and herbaceous ferns. Components that decreased in abundance upward were a collinite type 50 ??m in thickness, cutinite, calamite and cordaite miospores and kaolinite. Significant correlations occurred between ash yield and the collinite types > 50 and < 50 ??m in thickness but no significant correlation was found between ash yield and total vitrinite-group content. This is interpreted to show that division of vitrinite macerals by size is important in petrographic paleoenvironmental studies. Paleoecologic interpretations based upon these correlations suggest that two distinct, planar, probably topogenous paleoecologic environments are represented in this column of the Redstone coal. The lower two-thirds of the coal bed was interpreted to have accumulated in a planar swamp in which significant introduction of detrital or dissolved mineral matter, and significant anaerobic and moderate oxidative degradation of the peat occurred. The flora of this paleoenvironment was dominated by tree ferns. The paleoenvironment during accumulation of the upper one-third of the coal bed was also interpreted to have been a planar swamp, but one in which moderate to low introduction of detrital or dissolved mineral matter, and minor anaerobic and oxidative degradation of the peat occurred. The dominant flora of this paleoenvironment consisted mainly of calamites with fewer cordaites and herbaceous ferns. This study shows that valuable paleoecologic information may be obtained by sampling closely spaced vertical increments. No mixing of detrital sediments with the peat was observed in coal layers immediately adjacent to the parting or the overlying sandstone unit. ?? 1990.

  10. Dr. von Braun with Original Mercury Astronauts

    NASA Technical Reports Server (NTRS)

    1959-01-01

    Dr. Wernher von Braun, Director of the Army Ballistic Missile Agency's (ABMA) Development Operations Division, poses with the original Mercury astronauts in ABMA's Fabrication Laboratory during a 1959 visit. Inspecting Mercury-Redstone hardware are from left to right, Alan Shepard, Donald Deke Slayton, Virgil Gus Grissom, von Braun, Gordon Cooper, Wally Schirra, John Glenn, and Scott Carpenter. Project Mercury officially began October 7, 1958 as the United States' first manned space program.

  11. 2005 Defense Base Closure and Realignment Commission Report. Volume 1

    DTIC Science & Technology

    2005-01-01

    and Beale, and 15 A-10 aircraft realigned by the recommended closures of W.K. Kellogg Airport Air Guard Station, MI, and NAS Willow Grove, PA...functions of the Missile Defense Agency, except the Command and Control Battle Management and Communications Directorate, to Redstone Arsenal, AL... of other ships in the battle group. Systems are functionally integrated and not 287 separable as independent components. Furthermore, based on BRAC

  12. First in Space: The Army’s Role in U.S. Space Efforts, 1938-1958

    DTIC Science & Technology

    2017-06-09

    National Aeronautics and Space Administration ( NASA ) attempted to consolidate early space and missile efforts, inter-service rivalries coupled with...Redstone, Jupiter, ARPA, NASA 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT 18. NUMBER OF PAGES 19a. NAME OF RESPONSIBLE PERSON...Agency (ARPA) and the National Aeronautics and Space Administration ( NASA ) attempted to consolidate early space and missile efforts, inter- service

  13. Early Rockets

    NASA Image and Video Library

    1940-01-01

    This drawing illustrates the vital dimensions of the A-4 (Aggregate-4). Later renamed the V-2 (Vengeance Weapon-2), the rocket was developed by Dr. Wernher von Braun and the German rocket team at Peenemuende, Germany on the Baltic Sea. At the end of World War II, the team of German engineers and scientists came to the United States and continued rocket research for the Army at Fort Bliss, Texas, and Redstone Arsenal in Huntsville, Alabama.

  14. Early Rockets

    NASA Image and Video Library

    1940-01-01

    The cutaway drawing of the A-4 (Aggregate-4) rocket. Later renamed the V-2 (Vengeance Weapon-2), The rocket was developed by Dr. Wernher von Braun and the German rocket team at Peenemuende, Germany on the Baltic Sea. At the end of World War II, the team of German engineers and scientists came to the United States and continued rocket research for the Army at Fort Bliss, Texas, and Redstone Arsenal in Huntsville, Alabama.

  15. Cultural Resources Investigations at Redstone Arsenal, Madison County, Alabama. Volume II.

    DTIC Science & Technology

    1980-01-01

    was an infant or child . Parts of broken pottery vessels were found with two of the burials. I As mentioned above, ceramics were relatively infrequent...ai-j- IL is also due to a certain amiount of I tI ’rt ie 1(a ao -- tilit- iV! t-ri i process does not porn i t an extant I ii tfel to !, -,I) Ip it

  16. The Shock and Vibration Bulletin. Part 4. Damping and Machinery Dynamics

    DTIC Science & Technology

    1983-05-01

    Y. S. Shin, Naval Postgraduate School, Monterey, CA and M. K. Chargin, NASA Ames Research Center, Moffett Field, CA FLUID-STRUCTURE INTERACTION BY...Wright Aeronautical Laboratories, Wright-Patterson AFB, OH, and J. R. McGehee, NASA Langley Research Center, Hampton, VA ON THE MODAL... NASA Langley Missile Command, Redstone Arsenal, AL Research Center, Hampton, VA Mr. R. E. Seely, Naval Weapons Handlinj Center. Earle, Colts

  17. Demonstration and Validation of a Lightweight Composite Bridge Deck Technology as an Alternative to Reinforced Concrete

    DTIC Science & Technology

    2016-08-01

    Abstract Cyclic loading and weathering of reinforced concrete bridge decks cause corrosion of reinforcement steel , which leads to cracking, potholes...inforcement steel , on a deteriorated concrete bridge at Redstone Arsenal, AL. A pultruded deck system made by Zellcomp, Inc., was selected for...16 Figure 13. Form for grout haunch fabricated by tack welding steel strips to the top of the girder

  18. An Empirical Model of the Vertical Structure of German Fogs.

    DTIC Science & Technology

    1980-11-01

    Fitz ) ATTN: Dr. John E. Cockayne Washington, DC 20305 McLean, VA 22102 Director US Army Nuclear & Chemical Agency Defense Nuclear Agency ATTN: MONA-WE...Information Center John M. Hobbie ATTN: DRSMI-RPRD (Documents Section) c/o Kentron International Redstone Arsenal, AL 35809 2003 Byrd Spring Road...ATTN: Mr. John D. Carlyle Culter City, CA 90230 5383 Hollister Avenue Santa Barbara, CA 93111 Commander US Army Combat Developments Commander

  19. Project Mercury: NASA's first manned space programme

    NASA Astrophysics Data System (ADS)

    Catchpole, John

    Project Mercury will offer a developmental resume of the first American manned spaceflight programme and its associated infrastructure, including accounts of space launch vehicles. The book highlights the differences in Redstone/Atlas technology, drawing similar comparisons between ballistic capsules and alternative types of spacecraft. The book also covers astronaut selection and training, as well as tracking systems, flight control, basic principles of spaceflight and detailed accounts of individual flights.

  20. Development of Advanced Hydrocarbon Fuels at Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Bai, S. D.; Dumbacher, P.; Cole, J. W.

    2002-01-01

    This was a small-scale, hot-fire test series to make initial measurements of performance differences of five new liquid fuels relative to rocket propellant-1 (RP-1). The program was part of a high-energy-density materials development at Marshall Space Flight Center (MSFC), and the fuels tested were quadricyclane, 1-7 octodiyne, AFRL-1, biclopropylidene, and competitive impulse noncarcinogenic hypergol (CINCH) (di-methyl-aminoethyl-azide). All tests were conducted at MSFC. The first four fuels were provided by the U.S. Air Force Research Laboratory (AFRL), Edwards Air Force Base, CA. The U.S. Army, Redstone Arsenal, Huntsville, AL, provided the CINCH. The data recorded in all hot-fire tests were used to calculate specific impulse and characteristic exhaust velocity for each fuel, then compared to RP-1 at the same conditions. This was not an exhaustive study, comparing each fuel to RP-1 at an array of mixture ratios, nor did it include important fuel parameters, such as fuel handling or long-term storage. The test hardware was designed for liquid oxygen (lox)/RP-1, then modified for gaseous oxygen/RP-1 to avoid two-phase lox at very small flow rates. All fuels were tested using the same thruster/injector combination designed for RP-1. The results of this test will be used to determine which fuels will be tested in future test programs.

  1. Students Participate in Rocket Launch Project

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Filled with anticipation, students from three Huntsville area high schools: Randolph, Sparkman, and Johnson High Schools, counted down to launch the rockets they designed and built at the Army test site on Redstone Arsenal in Huntsville, Alabama. The projected two-mile high launch culminated more than a year's work and demonstrated the student team's ability to meet the challenge set by the Marshall Space Flight Center's (MSFC) Student Launch Initiative (SLI) program to apply science and math to experience, judgment, and common sense, and proved to NASA officials that they have successfully built reusable launch vehicles (RLVs), another challenge set by NASA's SLI program. MSFC's SLI program is an educational effort that aims to motivate students to pursue careers in science, math, and engineering. It provides hands-on, practical aerospace experience. In this picture, Randolph High School students are assembling their rocket in preparation for launch.

  2. Students Participate in Rocket Launch Project

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Filled with anticipation, students from three Huntsville area high schools: Randolph, Sparkman, and Johnson High Schools, counted down to launch the rockets they designed and built at the Army test site on Redstone Arsenal in Huntsville, Alabama. The projected two-mile high launch culminated more than a year's work and demonstrated the student team's ability to meet the challenge set by the Marshall Space Flight Center's (MSFC) Student Launch Initiative program to apply science and math to experience, judgment, and common sense, and proved to NASA officials that they have successfully built reusable launch vehicles (RLVs), another challenge set by NASA's SLI program. MSFC's SLI program is an educational effort that aims to motivate students to pursue careers in science, math, and engineering. It provides hands-on, practical aerospace experience. In this picture, a rocket built by Johnson High School students soars to it projected designation.

  3. Intelligent Vision Systems Independent Research and Development (IR&D) 2006

    NASA Technical Reports Server (NTRS)

    Patrick, Clinton; Chavis, Katherine

    2006-01-01

    This report summarizes results in conduct of research sponsored by the 2006 Independent Research and Development (IR&D) program at Marshall Space Flight Center (MSFC) at Redstone Arsenal, Alabama. The focus of this IR&D is neural network (NN) technology provided by Imagination Engines, Incorporated (IEI) of St. Louis, Missouri. The technology already has many commercial, military, and governmental applications, and a rapidly growing list of other potential spin-offs. The goal for this IR&D is implementation and demonstration of the technology for autonomous robotic operations, first in software and ultimately in one or more hardware realizations. Testing is targeted specifically to the MSFC Flat Floor, but may also include other robotic platforms at MSFC, as time and funds permit. For the purpose of this report, the NN technology will be referred to by IEI's designation for a subset configuration of its patented technology suite: Self-Training Autonomous Neural Network Object (STANNO).

  4. History of suborbital spaceflight: medical and performance issues.

    PubMed

    Campbell, Mark R; Garbino, Alejandro

    2011-04-01

    The development of manned sub-orbital commercial space vehicles is rapidly occurring and flight testing followed by operational flights will soon begin. The experience of manned suborbital spaceflight at the designated altitude (100 km/62.14 mi) is very limited--two Mercury-Redstone flights, two X-15 flights, one inadvertent Soyuz launch abort, and three recent SpaceShipOne flights, with only 15 min of critical flight time each. All indications were that the sequence of acceleration-weightlessness-deceleration was well tolerated with minimal neurovestibular dysfunction. However, there are some indications that distraction and spatial disorientation did occur. Vertigo on transition from the boost phase to weightlessness was reported on most high-altitude X-15 flights. +Gz tolerance to re-entry deceleration forces (as high as 6 + Gz) after 4 min of weightlessness is still unknown. Only further suborbital spaceflight experience will clarify if pilot performance will be affected.

  5. Propulsion at the Marshall Space Flight Center - A brief history

    NASA Technical Reports Server (NTRS)

    Jones, L. W.; Fisher, M. F.; Mccool, A. A.; Mccarty, J. P.

    1991-01-01

    The history of propulsion development at the NASA Marshall Space Flight Center is summarized, beginning with the development of the propulsion system for the Redstone missile. This course of propulsion development continues through the Jupiter IRBM, the Saturn family of launch vehicles and the engines that powered them, the Centaur upper stage and RL-10 engine, the Reactor In-Flight Test stage and the NERVA nuclear engine. The Space Shuttle Main Engine and Solid Rocket Boosters are covered, as are spacecraft propulsion systems, including the reaction control systems for the High Energy Astronomy Observatory and the Space Station. The paper includes a description of several technology efforts such as those in high pressure turbomachinery, aerospike engines, and the AS203 cyrogenic fluid management flight experiment. These and other propulsion projects are documented, and the scope of activities in support of these efforts at Marshall delineated.

  6. Impacts of Transitioning from Firm Fixed Price to Fixed Price Incentive Firm Target Contracts in PEO Missiles and Space

    DTIC Science & Technology

    2016-09-01

    including suggestions for reducing this burden, to Washington headquarters Services, Directorate for Information Operations and Reports, 1215...OSD) Defense Procurement and Acquisition Policy (DPAP), they were directed by Mr. Assad, Director of Defense Pricing, to change contract type to FPIF...Review. It was the determination of the Director of Army Contracting Command, Redstone Arsenal to make this transition. Shortly following this

  7. Computational Characterization of Electromagnetic Field Propagation in Complex Structures

    DTIC Science & Technology

    1998-04-10

    34Computational characterization of electromagnetic field propagation in complex structures", DAAH01-91-D-ROOS D.O. 59. Dr. Michael Scalora performed the...Development, and Engineering Center, Bldg. 7804, Room 242 Redstone Arsenal, Alabama 35898-5248 USA Dr. Michael Scalora Quantum Optics Group Tel:(205...scheduled to appear. They are: (1) M. Scalora , J.P. Dowling, A.S. Manka, CM. Bowden, and J.W. Haus, Pulse Propagation Near Highly Reflective

  8. Proceedings of the Meeting of the Coordinating Group on Modern Control Theory (3rd) (20-21 October 1981) US Army Missile Command, Redstone Arsenal, AL. Part I

    DTIC Science & Technology

    1981-11-01

    Systems Direc- "torate, Gen. Thomas J. Rodman Laboratory, Rock Island, IL, June 1976. 93 Next page is blank. _ _l7 - " - ON DESIGNING ROBUST PREDICTORS...34Optimal Terminal Guidance with Constraints at Final Time" Journal of Spacecraft and Rockets, Vol 14, No. 6, June 77, pp 381-383 [7] Adler , F. P. "Missile

  9. Early Rockets

    NASA Image and Video Library

    1940-01-01

    This German cutaway drawing of the Aggregate-4 (A-4) illustrates the dimensions and internal workings of the rocket. Later renamed the V-2, the rocket was developed by Dr. Wernher von Braun and the German Rocket Team at Peenemuende on the Baltic Sea. At the end of World War II, the team of German engineers and scientists came to the United States to work for the Army at Fort Bliss, Texas, and Redstone Arsenal in Huntsville, Alabama.

  10. Realization of New and Enhanced Materials Properties Through Nanostructural Control

    DTIC Science & Technology

    2009-08-14

    repeated and verified by Paul Ashley at US Army RDECOM, Redstone Arsenal, ALand Warren Herman at the Laboratory for Physical Sciences (LPS), College...proposed in the following sections of this proposal. REFERENCES (AFOSR-FA9550-06-I-0042 relevant publications) I. Paul M. Wallace, Daniel R. B. Sluss...8. Fletcher Kimura, Gamal Khalil, Nobuyuki Zettsu, Younan Xi a, James B. Callis, Martin Goutennan, Larry R Dalton, Dana Dabin, and Miguel

  11. Visible and Infrared Obscuration Effects of Ice Fog

    DTIC Science & Technology

    1981-05-01

    DC 20305 McLean, VA 22102 Director Science Applications, Inc. Defense Nuclear Agency 8400 Westpark Drive ATTN: RAAE (Dr. Carl Fitz ) ATTN: Dr. John E...Pinkley 4040 South Memorial Parkway Commander Huntsville, AL 35802 US Army Missile Command Redstone Scientific Information Center John M. Hobbie ATTN...Mugu, CA 93042 ATTN: Mr. Charles R. Hill Centinela and Teale Streets Effects Technology Inc. Bldg 305, MS T-73A ATTN: Mr. John 0. Carlyle Culter City

  12. Evaluation of Impinging Stream Vortex Chamber Concepts for Liquid Rocket Engine Applications

    NASA Technical Reports Server (NTRS)

    Trinh, Huu; Kopicz, Charles; Bullard, Brad; Michaels, Scott

    2003-01-01

    NASA Marshall Space Flight Center (MSFC) and the U. S. Army are jointly investigating vortex chamber concepts for cryogenic oxygen/hydrocarbon fuel rocket engine applications. One concept, the Impinging Stream Vortex Chamber Concept (ISVC), has been tested with gel propellants at AMCOM at Redstone Arsenal, Alabama. A version of this concept for the liquid oxygen (LOX)/hydrocarbon fuel (RP-1) propellant system is derived from the one for the gel propellant. An unlike impinging injector is employed to deliver the propellants to the chamber. MSFC has also designed two alternative injection schemes, called the chasing injectors, associated with this vortex chamber concept. In these injection techniques, both propellant jets and their impingement point are in the same chamber cross-sectional plane. One injector has a similar orifice size with the original unlike impinging injector. The second chasing injector has small injection orifices. The team has achieved their objectives of demonstrating the self-cooled chamber wall benefits of ISVC and of providing the test data for validating computational fluids dynamics (CFD) models. These models, in turn, will be used to design the optimum vortex chambers in the future.

  13. Modular Unix(Trade Name)-Based Vulnerability Estimation Suite (MUVES) analyst’s Guide

    DTIC Science & Technology

    1991-12-01

    Memorandum Report No. 1542, February 1964. [201 Steven B. Segletes, "A Model of the Effects of Transverse Velocity on ’the Penetration of a Shaped...Redstone Arsenal, AL 35898-5000 (Dr. Steven Carter) 220 Seventh Street, NE 1 Commander Charlottesville, VA 22901-5396. US Army Missile Command ATTN: AMSMI...Betbesda, MD 20084-5000 I University of DaytonDavid Taylor Research Center Graduate Engineering and Research ATTN: Steven L. Cohen Kettering Lab 262 Code

  14. Wernher von Braun

    NASA Image and Video Library

    1960-01-01

    In this photo, Director of the US Army Ballistic Missile Agency (ABMA) Development Operations Division, Dr. Wernher von Braun, is standing before a display of Army missiles celebrating ABMA's Fourth Open House. The missiles in the background include (left to right) a satellite on a Juno II shroud with a Nike Ajax pointing left in front of a Jupiter missile. The Lacrosse is in front of the Juno II. The Nike Hercules points skyward in front of the Juno II and the Redstone.

  15. Cultural Resources Investigations at Redstone Arsenal, Madison County, Alabama. Volume I.

    DTIC Science & Technology

    1980-01-01

    Parmalee and Klippel’s (1974) nutritional I study of freshwater shellfish further confirmed this point of view by demonstrating first that shellfish were...by no means a complete food from the standpoint of human nutrition , and second that they were 1 markedly lower in protein than other locally available...cultural complexity of the Late Archaic shellmound peoples as simply the by-product of the nutritional rich- ness of the shellfish. Instead, the

  16. Defining Conditions for the Use of Persistent Surveillance

    DTIC Science & Technology

    2009-12-01

    as hard as the Air Force has worked the North Dakota and Ohio delegations,’ says Colonel Charles Bartlett, head of a special Air Force task force on...UAVs…While Richard Shelby , the Republican senator from Alabama, is concerned about the impact on Redstone Arsenal, which manages much of the Army’s...UAV work, Byron Dorgan, the North Dakota Democratic senator, wants to attract more work for Grand Forks Air Force base, partly to make up for the

  17. Astronaut Alan Shepard receives MASA Distinguished Service award

    NASA Image and Video Library

    1961-05-07

    S88-31387 (8 May 1961) --- President John F. Kennedy (left) congratulates NASA's Distinguished Service Medal Award recipient astronaut Alan B. Shepard Jr. in a Rose Garden ceremony on May 8, 1961, at the White House. Vice-President Lyndon B. Johnson, NASA Administrator James E. Webb and several NASA astronauts are in the background. Three days earlier, Shepard made history with a 15-minute suborbital space mission in the Freedom 7, Mercury-Redstone 3 spacecraft. Photo credit: NASA

  18. Attempted Recovery of Mercury spacecraft at end of MR-4 mission

    NASA Image and Video Library

    1961-07-21

    S61-02826 (21 July 1961) --- A U.S. Marine Corps helicopter attempts an unsuccessful recovery of the Mercury-Redstone 4 "Liberty Bell 7" spacecraft. The spacecraft hatch opened prematurely, and astronaut Virgil I. Grissom, pilot, escaped into the water. The helicopter hooked onto the spacecraft but could not retrieve it. Grissom was recovered by another helicopter and flown to the recovery ship, USS Randolph. The Mercury spacecraft sank to the bottom of the ocean. Photo credit: NASA

  19. Attempted Recovery of Mercury spacecraft at end of MR-4 mission

    NASA Image and Video Library

    1961-07-21

    S61-02824 (21 July 1961) --- A U.S. Marine Corps helicopter attempts an unsuccessful recovery of the Mercury-Redstone 4 "Liberty Bell 7" spacecraft. The spacecraft hatch opened prematurely, and astronaut Virgil I. Grissom, pilot, escaped into the water. The helicopter hooked onto the spacecraft but could not retrieve it. Grissom was recovered by another helicopter and flown to the recovery ship, USS Randolph. The Mercury spacecraft sank to the bottom of the ocean. Photo credit: NASA

  20. Proceedings of the Open Sessions of the Workshop on Imaging Trackers and Autonomous Acquisition Applications for Missile Guidance Held at Redstone Arsenal, Alabama on 19-20 November 1979

    DTIC Science & Technology

    1979-11-01

    a generalized cooccurrence matrix. Describing image texture is an important problem in the design of image understanding systems . Applications as...display system design optimization and video signal processing. Based on a study by Southern Research Institute , a number of options were identified...Specification for Target Acquisition Designation System (U), RFP # AMC-DP-AAH-H4020, i2 Apr 77. 4. Terminal Homing Applications of Solid State Image

  1. Enhancement and Suppression of Transmission in 3-D Nanoslits Arrays with 1- and 2-D Periodicities

    DTIC Science & Technology

    2011-01-01

    Technologies Group, 410 Jan Davis Dr., Huntsville, AL 35806 M. Scalora Charles M. Bowden Research Center AMSRD-AMR-WS-ST, RDECOM, Redstone Arsenal... Scalora , M., “Second harmonic generation from nanoslits in metal substrates: applications to palladium-based H2 sensor,” J. Nanophotonics 2, 021851 (2008...5] Vincenti, M.A., D’Orazio, A., Buncick, M., Akozbek, N., Bloemer, M.J. and Scalora , M., "Beam steering from resonant sub-wavelength slits

  2. Dr. von Braun In Front of a Display of Missiles

    NASA Technical Reports Server (NTRS)

    1960-01-01

    In this photo, Director of the US Army Ballistic Missile Agency (ABMA) Development Operations Division, Dr. Wernher von Braun, is standing before a display of Army missiles celebrating ABMA's Fourth Open House. The missiles in the background include (left to right) a satellite on a Juno II shroud with a Nike Ajax pointing left in front of a Jupiter missile. The Lacrosse is in front of the Juno II. The Nike Hercules points skyward in front of the Juno II and the Redstone.

  3. Adaptive Integration and Optimization of Automated and Neural Processing Systems - Establishing Neural and Behavioral Benchmarks of Optimized Performance

    DTIC Science & Technology

    2012-07-01

    detection only condition followed either face detection only or dual task, thus ensuring that participants were practiced in face detection before...1 ARMY RSCH LABORATORY – HRED RDRL HRM C A DAVISON 320 MANSCEN LOOP STE 115 FORT LEONARD WOOD MO 65473 2 ARMY RSCH LABORATORY...HRED RDRL HRM DI T DAVIS J HANSBERGER BLDG 5400 RM C242 REDSTONE ARSENAL AL 35898-7290 1 ARMY RSCH LABORATORY – HRED RDRL HRS

  4. Acceleration of an Initially Moving Projectile: Velocity-Injected Railguns and Their Effect on Pulsed Power

    DTIC Science & Technology

    2009-07-01

    section 2, the propellant gun is assessed from existing experimental data. In section 3, circuit analysis is used to model the railgun with a 2 launch...An Empirical Model for Plasma Armature Voltage. IEEE Transactions on Magnetics 1991, 27, 283–288. 11. Elder, D. The First Generation in the...1 US ARMY MISSLE COMMAND AMSRD AMR W W C MCCORKLE 5400 FOWLER RD REDSTONE ARSENAL AL 35898-5240 1 US ARMY TACOM TARDEC AMSTA TR

  5. Maintenance Task Data Base for Buildings: Electrical Systems

    DTIC Science & Technology

    1991-05-01

    ton [.13 Fitchburg [.08 Springfie Id 1.08 Army Mtls & Mech Research Ctr 1.13 Fort Devens 1.15 Natick Research & Development Ctr [.L3 South Weymouth...Anniston Army Depot .8l Huntsville .88 Fort McClellan .80 Redstone Arsenal .88 Fort Rucker .80 Alaska State Average 2.25 Anchorage L.92 Delta Junction...3.73 Fort Greely 2.70 Fort Richardson L.92 Fort Wainwright 2.13 Arizona State Average 1.02 Flagstaff [.02 Phoenix .99 Tucson L.05 Fort Huachuca 1.22

  6. Effects of Physical Impairment on Grenade Throwing and Weapon Loading Tasks

    DTIC Science & Technology

    2015-03-01

    1 GOVT PRINTG OFC (PDF) A MALHOTRA 1 ARMY RSCH LABORATORY – HRED (PDF) RDRL HRM D T DAVIS BLDG 5400 RM C242 REDSTONE ARSENAL...5002 1 ARMY RSCH LABORATORY – HRED (PDF) RDRL HRM DG J RUBINSTEIN BLDG 333 PICATINNY ARSENAL NJ 07806-5000 1 ARMY RSCH LABORATORY...HRED (PDF) ARMC FIELD ELEMENT RDRL HRM CH C BURNS THIRD AVE BLDG 1467B RM 336 FORT KNOX KY 40121 1 ARMY RSCH LABORATORY – HRED

  7. An Advanced 500-MHZ-Bandwidth Fiber-Optic Signal Link for EMP and General Laboratory Applications.

    DTIC Science & Technology

    1981-07-01

    EVALUATION DIR DEPT OF THE ARMY REDSTONE ARSENAL, AL 35809 ATTN STEWS -CE, COMMUNICATIONS/ ELEC OFFICE DIRECTOR ATTN STEWS -NR, NATIONAL RANGE NIGHT...VISION & ELECTRO-OPTICS LABORATORY OPERATIONS DIR ATTN DELNV-EO, E-O DEVICES DIV ATTN STEWS -ID, INSTRUMENTATION DIR FORT BELVOIR, VA 22060 ATTN STEWS -ID...22900 ATTN WHITTAKER, D., 22900 SPECTRONICS ATTN LAMB , R. C., 22900 ATTN L. STEWART ATTN OLDHAM, T. R., 2300 ATTN MR. SHAUNFIELD ATTN KEHS, A., 22300

  8. On the Spatial Power Spectrum of the E x B Gradient Drift Instability in Ionospheric Plasma Clouds.

    DTIC Science & Technology

    1981-04-14

    Perkins et al., 1973]. In reality, an artificially injected plasma cloud will, initially, be two- dimensional in the plane perpendicular to the magnetic...Motion of Artificial Ion Clouds in the Upper Atmosphere, Planet. Space Sci., 15, 1, 1967. Kelley, M.C., K.D. Baker, and J.C. Ulwick, Late Time Barium...42960 COMiANDER WORLOA’AY POS’AL CENTER J.S. ARMY MISSILE INTELLIGENCE AGENCY "’OS ANGELES, CA. 90009 REDSTONE ARSENAL, AL 35809 OICY ATTN CODE 52 0ICY

  9. Proceedings of the 1981 Army Numerical Analysis and Computers Conference, held U. S. Army Missile Command, Redstone Arsenal, Alabama, 26-27 February 1981

    DTIC Science & Technology

    1981-08-01

    loaded Loading done Time= 1295 msec. SQRT(3) %I + 1 SQRT(3) %I - 1 SQRT(3) %I f 1 (D13) TX = 1---------+-1** x = C-l---+-------, x = - 1, x...thnrl its competitors. As is to be expected, the table makes cJc ;lr the benefits of subincrement ing for nny approximation. For example, usiny the...Acquisition Systems ( DACS ) and a Data Analysis System (DAN), The DACs will be microprocessor-based recording devices with software-control

  10. Proceedings of the Smoke/Obscurants Symposium 5, Held at Harry Diamond Laboratories, Adelphi, Maryland 28, 29, & 30 April, 1981. Volume 2

    DTIC Science & Technology

    1981-07-01

    C-11. Cluttor Rejecti,, Techniques for Laser Semi-Active Missile Systems .................. 715 .H. F. Anders.n (MICOM), F. J. Polge ’UAHIi...Qriffin, J, A-25* Price, W. R. A-11PGriffith. P. N, A-4* Poleski, F. D-5PGuerin, M. C-16 Polge , R. J. C-11l xvii Proceedings Papers by Author...Sensors Directorate US Army Missile Laboratory US Army Missile Command Redstone Arsenal, Alabama 35898 ROBERT J. POLGE University of Alabama, Huntsville

  11. A Computer Program to Implement the Chen Method of Dimensional Analysis

    DTIC Science & Technology

    1990-01-01

    Director: AXHE-S (m. B Corna)U.S. Army TRADOX Systems Analysis Activity ATTdN: AXrE-IS (Mr. B. Corona) ATM: ATOR-TSL Aberden Proving Ground , MD 21005-5001...Laboratory I Aberdeen Proving Ground , MD 21005-5066 ATTN: AMSMI-ROC Redstone Arsenal, AL 35898-5242 Direct or D U.S. Army Human Engineering Laboratory 1...Kokinakis) U.S. Army Missile Laboratory Aberdeen Proving Ground , MD 21005-5066 ReTN AMSMI-R C1edstone Arsenal, AL 35898-5242 Director Director 1 U.S. Army

  12. Data Collecting using the MetalMapper in Dynamic Data Acquisition and Cued Modes TEMTADS Surveys at Redstone Arsenal, Huntsville, Alabama

    DTIC Science & Technology

    2017-06-20

    inch mortars, large caliber projectiles (75-millimeter [mm] to 155-mm), and numerous types of bombs . With the exception of some areas north of RSA-312...scarring/craters are visible in RSA-073 in the Light Detection and Ranging data set. The MEC reportedly used in RSA-073 includes: AN-M76 bombs , PT1...incendiary mixture similar to Goop) filled; M47-type bombs , isobutyl methacrylate incendiary mix (IM-AE) and napalm filled; M69 bombs , IM-AE filled; 155

  13. Redstone Scientific Information Center (RSIC) UTS400 Terminal Users Guide.

    DTIC Science & Technology

    1982-06-04

    will cause the cursor to be moved to the third space in the second line. Now press the normal keys H and 0 respectively. 7. Completion of Item 5 and 6...the normal keys D and 1. 4. Press Tab Forward key once. This will cause the cursor to be moved to the third space in the second line. Now press the...cause the cursor to be moved to the third space in the second line. Now press the normal keys H and 0. r. Now the cursor should be resting under the

  14. 1201050

    NASA Image and Video Library

    2012-10-26

    FROM RIGHT, MARSHALL RESEARCHER DR. DAVID SMITH, U.S. ARMY RESEARCHER KRISHNA MYNENI AND ARMY CONTRACTOR HONGROK CHANG HAVE BEGUN A THREE-YEAR NASA PROJECT TO DEVELOP INNOVATIVE NEW GYROSCOPES THAT COULD DRAMATICALLY IMPROVE IN-FLIGHT NAVIGATION CAPABILITIES FOR SPACE VEHICLES, MILITARY AIR AND SEA ASSETS AND COMMERCIAL VEHICLES. THE “FAST LIGHT OPTICAL GYROSCOPES FOR PRECISE INERTIAL NAVIGATION” PROJECT INCLUDES RESEARCHERS AT NASA’S MARSHALL SPACE FLIGHT CENTER IN HUNTSVILLE, ALA.; THE U.S. ARMY AVIATION AND MISSILE RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (AMRDEC) AT REDSTONE ARSENAL IN HUNTSVILLE; AND NORTHWESTERN UNIVERSITY IN EVANSTON, ILL.

  15. A Description on the Second Dataset of the U.S. Army Research Laboratory Force Protection Surveillance System

    DTIC Science & Technology

    2007-08-01

    Powder Mill Road, Adelphi, MD 20783, TEL - 301-394-1677, FAX - 301-394-5234, or e -mail achan@arl.army.mil. 13 Appendix A. Ground-truth Information...Rd FT Belvoir VA 22060-5806 Commander US Army RDECOM 1 HC ATTN AMSRD AMR W C McCorkle 5400 Fowler Rd Redstone Arsenal AL 35898-5000 18...Picatinney Arsenal NJ 07806-5000 US Army RDECOM TARDEC 1 HC ATTN AMSRD TAR R G R Gerhart 6501 E Eleven Rd MS 263 Warren MI 48397-5000 US Army

  16. Key aspects of cost effective collector and solar field design

    NASA Astrophysics Data System (ADS)

    von Reeken, Finn; Nicodemo, Dario; Keck, Thomas; Weinrebe, Gerhard; Balz, Markus

    2016-05-01

    A study has been performed where different key parameters influencing solar field cost are varied. By using levelised cost of energy as figure of merit it is shown that parameters like GoToStow wind speed, heliostat stiffness or tower height should be adapted to respective site conditions from an economical point of view. The benchmark site Redstone (Northern Cape Province, South Africa) has been compared to an alternate site close to Phoenix (AZ, USA) regarding site conditions and their effect on cost-effective collector and solar field design.

  17. 46 CFR 160.066-13 - Technical tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Technical tests. 160.066-13 Section 160.066-13 Shipping....066-13 Technical tests. (a) The following conditions apply to technical tests as described in this... signals are protected by sealed packaging, then the conditioning for the technical tests must be conducted...

  18. 46 CFR 160.066-13 - Technical tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Technical tests. 160.066-13 Section 160.066-13 Shipping....066-13 Technical tests. (a) The following conditions apply to technical tests as described in this... signals are protected by sealed packaging, then the conditioning for the technical tests must be conducted...

  19. Around Marshall

    NASA Image and Video Library

    1961-08-14

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo shows the construction progress of the test stand as of August 14, 1961.

  20. Around Marshall

    NASA Image and Video Library

    1961-08-18

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo shows the construction progress of the test stand as of August 18, 1961.

  1. Around Marshall

    NASA Image and Video Library

    1963-04-17

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photograph taken April 17, 1963, gives a look at the four tower legs of the S-IC test stand at their completed height.

  2. Around Marshall

    NASA Image and Video Library

    1961-07-21

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In this photo, taken July 21, 1961, a worker can be seen inside the test stand work area with a jack hammer.

  3. Around Marshall

    NASA Image and Video Library

    1963-11-20

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo shows the progress of the S-IC test stand as of November 20, 1963.

  4. Around Marshall

    NASA Image and Video Library

    1963-06-24

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In this photo, taken June 24, 1963, the four tower legs of the test stand can be seen at their maximum height.

  5. Around Marshall

    NASA Image and Video Library

    1961-07-31

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In this photo, taken July 31, 1961, work is continued in the clearing of the test stand site.

  6. Around Marshall

    NASA Image and Video Library

    1963-02-25

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photograph taken February 25, 1963, gives a close up look at two of the ever-growing four towers of the S-IC Test Stand.

  7. Around Marshall

    NASA Image and Video Library

    1961-08-11

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo shows the construction progress of the test stand as of August 11, 1961.

  8. Around Marshall

    NASA Image and Video Library

    1963-05-07

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photograph, taken from ground level on May 7, 1963, gives a close look at one of the four towers legs of the S-IC test stand nearing its completed height.

  9. Around Marshall

    NASA Image and Video Library

    1963-05-07

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photograph, taken May 7, 1963, gives a close look at the four concrete tower legs of the S-IC test stand at their completed height.

  10. Around Marshall

    NASA Image and Video Library

    1961-07-21

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In this photo, taken July 21, 1961, workers can be seen inside the test stand work area clearing the site.

  11. Around Marshall

    NASA Image and Video Library

    1963-09-18

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. This photograph taken September 18, 1963 shows a spherical hydrogen tank being constructed next to the S-IC test stand.

  12. Around Marshall

    NASA Image and Video Library

    1963-10-10

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo shows the progress of the S-IC test stand as of October 10, 1963. Kerosene storage tanks can be seen to the left.

  13. Around Marshall

    NASA Image and Video Library

    1961-09-07

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo shows the construction progress of the S-IC test stand as of September 7, 1961.

  14. Construction Progress of the S-IC Test Stand-Steel Reinforcements

    NASA Technical Reports Server (NTRS)

    1961-01-01

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army's Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo, taken September 15, 1961, shows the installation of the reinforcing steel prior to the pouring of the concrete foundation walls.

  15. Around Marshall

    NASA Image and Video Library

    1961-07-10

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In this photo, taken July 10, 1961, actual ground breaking has occurred for the S-IC test stand site.

  16. Around Marshall

    NASA Image and Video Library

    1961-06-30

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In this early construction photo, taken June 30, 1961, workers are involved in the survey and site preparation for the test stand.

  17. EO/IR scene generation open source initiative for real-time hardware-in-the-loop and all-digital simulation

    NASA Astrophysics Data System (ADS)

    Morris, Joseph W.; Lowry, Mac; Boren, Brett; Towers, James B.; Trimble, Darian E.; Bunfield, Dennis H.

    2011-06-01

    The US Army Aviation and Missile Research, Development and Engineering Center (AMRDEC) and the Redstone Test Center (RTC) has formed the Scene Generation Development Center (SGDC) to support the Department of Defense (DoD) open source EO/IR Scene Generation initiative for real-time hardware-in-the-loop and all-digital simulation. Various branches of the DoD have invested significant resources in the development of advanced scene and target signature generation codes. The SGDC goal is to maintain unlimited government rights and controlled access to government open source scene generation and signature codes. In addition, the SGDC provides development support to a multi-service community of test and evaluation (T&E) users, developers, and integrators in a collaborative environment. The SGDC has leveraged the DoD Defense Information Systems Agency (DISA) ProjectForge (https://Project.Forge.mil) which provides a collaborative development and distribution environment for the DoD community. The SGDC will develop and maintain several codes for tactical and strategic simulation, such as the Joint Signature Image Generator (JSIG), the Multi-spectral Advanced Volumetric Real-time Imaging Compositor (MAVRIC), and Office of the Secretary of Defense (OSD) Test and Evaluation Science and Technology (T&E/S&T) thermal modeling and atmospherics packages, such as EOView, CHARM, and STAR. Other utility packages included are the ContinuumCore for real-time messaging and data management and IGStudio for run-time visualization and scenario generation.

  18. Students Participate in Rocket Launch Project

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Filled with anticipation, students from two local universities, the University of Alabama in Huntsville (UAH), and Alabama Agricultural Mechanical University (AM), counted down to launch the rockets they designed and built at the Army test site on Redstone Arsenal in Huntsville, Alabama. The projected two-mile high launch culminated more than a year's work and demonstrated the student team's ability to meet the challenge set by the Marshall Space Flight Center's (MSFC) Student Launch Initiative (SLI) program to apply science and math to experience, judgment, and common sense, and proved to NASA officials that they have successfully built reusable launch vehicles (RLVs), another challenge set by NASA's SLI program. MSFC's SLI program is an educational effort that aims to motivate students to pursue careers in science, math, and engineering. It provides the students with hands-on, practical aerospace experience. UAH students designed and built the rocket and AM students designed the payload. In this picture, AM students prepare their payload, an experiment that measures the amount of hydrogen produced during electroplating with nickel in a brief period of micrgravity, prior to launch.

  19. Students Participate in Rocket Launch Project

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Filled with anticipation, students from two local universities, the University of Alabama in Huntsville (UAH), and Alabama Agricultural Mechanical University (AM), counted down to launch the rockets they designed and built at the Army test site on Redstone Arsenal in Huntsville, Alabama. The projected two-mile high launch culminated more than a year's work and demonstrated the student team's ability to meet the challenge set by the Marshall Space Flight Center's (MSFC) Student Launch Initiative (SLI) program to apply science and math to experience, judgment, and common sense, and proved to NASA officials that they have successfully built reusable launch vehicles (RLVs), another challenge set by NASA's SLI program. MSFC's SLI program is an educational effort that aims to motivate students to pursue careers in science, math, and engineering. It provides the students with hands-on, practical aerospace experience. In this picture, a student from AM and his mentor install their payload into the launch vehicle which was built by the team of UAH students. The scientific payload, developed and built by the team of AM students, measured the amount of hydrogen produced during electroplating with nickel in a brief period of micrgravity.

  20. Students Participate in Rocket Launch Project

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Filled with anticipation, students from two local universities, the University of Alabama in Huntsville (UAH), and Alabama Agricultural Mechanical University (AM), counted down to launch the rockets they designed and built at the Army test site on Redstone Arsenal in Huntsville, Alabama. The projected two-mile high launch culminated more than a year's work and demonstrated the student team's ability to meet the challenge set by the Marshall Space Flight Center's (MSFC) Student Launch Initiative (SLI) program to apply science and math to experience, judgment, and common sense, and proved to NASA officials that they have successfully built reusable launch vehicles (RLVs), another challenge set by NASA's SLI program. MSFC's SLI program is an educational effort that aims to motivate students to pursue careers in science, math, and engineering. It provides the students with hands-on, practical aerospace experience. In this picture, the combined efforts of students from UAH and AM sent this rocket soaring into flight. Students at UAH built the rocket and AM students developed its scientific payload, an experiment that measures the amount of hydrogen produced during electroplating with nickel in a brief period of micrgravity.

  1. Students Participate in Rocket Launch Project

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Filled with anticipation, students from two local universities, the University of Alabama in Huntsville (UAH), and Alabama Agricultural Mechanical University (AM), counted down to launch the rockets they designed and built at the Army test site on Redstone Arsenal in Huntsville, Alabama. The projected two-mile high launch culminated more than a year's work and demonstrated the student team's ability to meet the challenge set by the Marshall Space Flight Center's (MSFC) Student Launch Initiative (SLI) Program to apply science and math to experience, judgment, and common sense, and proved to NASA officials that they have successfully built reusable launch vehicles (RLVs), another challenge set by NASA's SLI program. MSFC's SLI program is an educational effort that aims to motivate students to pursue careers in science, math, and engineering. It provides the students with hands-on, practical aerospace experience. In this picture, the university students prepare their rocket for flight on the launch pad. Students at UAH built the rocket and AM students developed its scientific payload, an experiment that measures the amount of hydrogen produced during electroplating with nickel in a brief period of micrgravity.

  2. Students Participate in Rocket Launch Project

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Filled with anticipation, students from two local universities, the University of Alabama in Huntsville (UAH), and Alabama Agricultural Mechanical University (AM), counted down to launch the rockets they designed and built at the Army test site on Redstone Arsenal in Huntsville, Alabama. The projected two-mile high launch culminated more than a year's work and demonstrated the student team's ability to meet the challenge set by the Marshall Space Flight Center's (MSFC) Student Launch Initiative (SLI) program to apply science and math to experience, judgment, and common sense, and proved to NASA officials that they have successfully built reusable launch vehicles (RLVs), another challenge set by NASA's SLI program. MSFC's SLI program is an educational effort that aims to motivate students to pursue careers in science, math, and engineering. It provides the students with hands-on, practical aerospace experience. In this picture, the University students prepare their rocket for launch. Students at UAH built the rocket and AM students developed its scientific payload, an experiment that measures the amount of hydrogen produced during electroplating with nickel in a brief period of micrgravity.

  3. Around Marshall

    NASA Image and Video Library

    2002-05-22

    Filled with anticipation, students from two local universities, the University of Alabama in Huntsville (UAH), and Alabama Agricultural Mechanical University (AM), counted down to launch the rockets they designed and built at the Army test site on Redstone Arsenal in Huntsville, Alabama. The projected two-mile high launch culminated more than a year's work and demonstrated the student team's ability to meet the challenge set by the Marshall Space Flight Center's (MSFC) Student Launch Initiative (SLI) program to apply science and math to experience, judgment, and common sense, and proved to NASA officials that they have successfully built reusable launch vehicles (RLVs), another challenge set by NASA's SLI program. MSFC's SLI program is an educational effort that aims to motivate students to pursue careers in science, math, and engineering. It provides the students with hands-on, practical aerospace experience. In this picture, the University students prepare their rocket for launch. Students at UAH built the rocket and AM students developed its scientific payload, an experiment that measures the amount of hydrogen produced during electroplating with nickel in a brief period of micrgravity.

  4. Around Marshall

    NASA Image and Video Library

    2002-05-22

    Filled with anticipation, students from two local universities, the University of Alabama in Huntsville (UAH), and Alabama Agricultural Mechanical University (AM), counted down to launch the rockets they designed and built at the Army test site on Redstone Arsenal in Huntsville, Alabama. The projected two-mile high launch culminated more than a year's work and demonstrated the student team's ability to meet the challenge set by the Marshall Space Flight Center's (MSFC) Student Launch Initiative (SLI) program to apply science and math to experience, judgment, and common sense, and proved to NASA officials that they have successfully built reusable launch vehicles (RLVs), another challenge set by NASA's SLI program. MSFC's SLI program is an educational effort that aims to motivate students to pursue careers in science, math, and engineering. It provides the students with hands-on, practical aerospace experience. UAH students designed and built the rocket and AM students designed the payload. In this picture, AM students prepare their payload, an experiment that measures the amount of hydrogen produced during electroplating with nickel in a brief period of micrgravity, prior to launch.

  5. Around Marshall

    NASA Image and Video Library

    2002-05-23

    Filled with anticipation, students from two local universities, the University of Alabama in Huntsville (UAH), and Alabama Agricultural Mechanical University (AM), counted down to launch the rockets they designed and built at the Army test site on Redstone Arsenal in Huntsville, Alabama. The projected two-mile high launch culminated more than a year's work and demonstrated the student team's ability to meet the challenge set by the Marshall Space Flight Center's (MSFC) Student Launch Initiative (SLI) program to apply science and math to experience, judgment, and common sense, and proved to NASA officials that they have successfully built reusable launch vehicles (RLVs), another challenge set by NASA's SLI program. MSFC's SLI program is an educational effort that aims to motivate students to pursue careers in science, math, and engineering. It provides the students with hands-on, practical aerospace experience. In this picture, the combined efforts of students from UAH and AM sent this rocket soaring into flight. Students at UAH built the rocket and AM students developed its scientific payload, an experiment that measures the amount of hydrogen produced during electroplating with nickel in a brief period of micrgravity.

  6. Around Marshall

    NASA Image and Video Library

    2002-05-22

    Filled with anticipation, students from two local universities, the University of Alabama in Huntsville (UAH), and Alabama Agricultural Mechanical University (AM), counted down to launch the rockets they designed and built at the Army test site on Redstone Arsenal in Huntsville, Alabama. The projected two-mile high launch culminated more than a year's work and demonstrated the student team's ability to meet the challenge set by the Marshall Space Flight Center's (MSFC) Student Launch Initiative (SLI) program to apply science and math to experience, judgment, and common sense, and proved to NASA officials that they have successfully built reusable launch vehicles (RLVs), another challenge set by NASA's SLI program. MSFC's SLI program is an educational effort that aims to motivate students to pursue careers in science, math, and engineering. It provides the students with hands-on, practical aerospace experience. In this picture, a student from AM and his mentor install their payload into the launch vehicle which was built by the team of UAH students. The scientific payload, developed and built by the team of AM students, measured the amount of hydrogen produced during electroplating with nickel in a brief period of micrgravity.

  7. Around Marshall

    NASA Image and Video Library

    2002-05-22

    Filled with anticipation, students from two local universities, the University of Alabama in Huntsville (UAH), and Alabama Agricultural Mechanical University (AM), counted down to launch the rockets they designed and built at the Army test site on Redstone Arsenal in Huntsville, Alabama. The projected two-mile high launch culminated more than a year's work and demonstrated the student team's ability to meet the challenge set by the Marshall Space Flight Center's (MSFC) Student Launch Initiative (SLI) Program to apply science and math to experience, judgment, and common sense, and proved to NASA officials that they have successfully built reusable launch vehicles (RLVs), another challenge set by NASA's SLI program. MSFC's SLI program is an educational effort that aims to motivate students to pursue careers in science, math, and engineering. It provides the students with hands-on, practical aerospace experience. In this picture, the university students prepare their rocket for flight on the launch pad. Students at UAH built the rocket and AM students developed its scientific payload, an experiment that measures the amount of hydrogen produced during electroplating with nickel in a brief period of micrgravity.

  8. Around Marshall

    NASA Image and Video Library

    1963-01-14

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo, depicts the progress of the stand as of January 14, 1963, with its four towers prominently rising.

  9. Around Marshall

    NASA Image and Video Library

    1961-09-29

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo, taken September 29, 1961, shows the progress of the concrete walls for the stand’s foundation. Some of the walls have been poured and some of the concrete forms have been removed.

  10. Around Marshall

    NASA Image and Video Library

    1961-09-15

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo, taken September 15, 1961, shows the installation of the reinforcing steel prior to the pouring of the concrete foundation walls.

  11. Around Marshall

    NASA Image and Video Library

    1961-09-22

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo, taken September 22, 1961, shows the progress of the concrete walls for the stand’s foundation. Some of the walls have been poured and some of the concrete forms have been removed.

  12. Around Marshall

    NASA Image and Video Library

    1961-09-07

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo shows the construction progress of the forms for the concrete foundation walls as of September 7, 1961.

  13. Wernher von Braun

    NASA Image and Video Library

    1960-01-01

    Dr. Wernher von Braun served as Marshall Space Flight Center's first director from July 1, 1960 until January 27, 1970, when he was appointed NASA Deputy Associate Administrator for Plarning. Following World War II, Dr. von Braun and his German colleagues arrived in the United States under Project Paperclip to continue their rocket development work. In 1950, von Braun and his rocket team were transferred from Ft. Bliss, Texas to Huntsville, Alabama to work for the Army's rocket program at Redstone Arsenal and later, NASA's Marshall Space Flight Center. Under von Braun's leadership, Marshall developed the Saturn V launch vehicle which took Apollo astronauts to the moon.

  14. Around Marshall

    NASA Image and Video Library

    1962-03-08

    The members of the House Committee on Science and Astronautics visited the Marshall Space Flight Center (MSFC) on March 9, 1962 to gather firsthand information of the nation’s space exploration program. The congressional group was composed of members of the Subcommittee on Manned Space Flight. The subcommittee was briefed on MSFC’s manned space efforts earlier in the day and then inspected mockups of the Saturn I Workshop and the Apollo Telescope Mount, two projects developed by MSFC for the post-Apollo program. In this photograph, MSFC Director, Dr. Wernher von Braun, bids farewell to Texas Democratic Representative Olin E. Teague before departure at the Redstone Arsenal Airstrip.

  15. Mercury Capsule Model in the 1- by 1-Foot Supersonic Wind Tunnel

    NASA Image and Video Library

    1959-10-21

    National Aeronautics and Space Administration (NASA) researchers install a small-scale model of the capsule for Project Mercury in the 1- by 1-Foot Supersonic Wind Tunnel at the Lewis Research Center. NASA Lewis conducted a variety of tests for Project Mercury, including retrorocket calibration, escape tower engine performance, and separation of the capsule from simulated Atlas and Redstone boosters. The test of this capsule and escape tower model in the 1- by 1-foot tunnel were run in January and February 1960. The 1-by 1-Foot Supersonic Wind Tunnel had a 15-inch long test section, seen here, that was one foot wide and one foot high. The sides were made of glass to allow cameras to capture the supersonic air flow over the models. The tunnel could generate air flows from Mach 1.3 to 3.0. At the time, it was one of nine small supersonic wind tunnels at Lewis. These tunnels used the exhauster and compressor equipment of the larger facilities. The 1- by 1 tunnel, which began operating in the early 1950s, was built inside a test cell in the expansive Engine Research Building. During the 1950s the 1- by 1 was used to study a variety of inlets, nozzles, and cones for missiles and scramjets. The Mercury capsule tests were among the last at the facility for many years. The tunnel was mothballed in 1960. The 1- by 1 was briefly restored in 1972, then brought back online for good in 1979. The facility has maintained a brisk operating schedule ever since.

  16. PROJECT MERCURY SUMMARY CONFERENCE - NASA - HOUSTON, TX

    NASA Image and Video Library

    1963-10-01

    In October 1963, the Project Mercury Summary Conference was held in the Houston, TX, Coliseum. This series of 44 photos is documentation of that conference. A view of the Houston, TX, Coliseum, and parking area in front with a Mercury Redstone Rocket setup in the parking lot for display (S63-16451). A view of an Air Force Atlas Rocket, a Mercury Redstone Rocket, and a Mercury Spacecraft on a test booster on display in the front area of the Coliseum (S63-16452). A view an Air Force Atlas Rocket and a Mercury Redstone Rocket set up for display with the Houston City Hall in the background (S63- 16453). This view shows the Atlas Rocket, Mercury Redstone, and Mercury Test Rocket with the Houston, TX, Coliseum in the background (S63- 16454). A balcony view, from the audience right side, of the attendees looking at the stage (S63-16455). A view of the NASA Space Science Demonstration with equipment setup on a table, center stage and Space Science Specialist briefing the group as he pours Liquid Oxygen into a beaker (S63-16456). View of the audience from the balcony on the audience right showing the speakers lecturn on stage to the audience left (S63-16457). A view of attendees in the lobby. Bennet James, MSC Public Affairs Office is seen to the left of center (S63-16458). Another view of the attendees in the lobby (S63- 16459). In this view, Astronaut Neil Armstrong is seen writing as others look on (S63-16460). In this view of the attendees, Astronauts Buzz Aldrin and Walt Cunningham are seen in the center of the shot. The October Calendar of Events is visable in the background (S63-16461). Dr. Charles Berry is seen in this view to the right of center, seated in the audience (S63-16462). View of " Special Registration " and the five ladies working there (S63-16463). A view from behind the special registration table, of the attendees being registered (S63-16464). A view of a conference table with a panel seated. (R-L): Dr. Robert R. Gilruth, Hugh L. Dryden, Walter C. Williams, and an unidentified man (S63- 16465). A closeup of the panel at the table with Dr. Gilruth on the left (S63-16466). About the same shot as number S63-16462, Dr. Berry is seen in this shot as well (S63-16467). In this view the audio setup is seen. In the audience, (L-R): C. C. Kraft, Vernon E. (Buddy) Powell, Public Affairs Office (PAO); and, in the foreground mixing the audio is Art Tantillo; and, at the recorder is Doyle Hodges both of the audio people are contractors that work for PAO at MSC (S63-16468). In this view Maxime Faget is seen speaking at the lecturn (S63-16469). Unidentified person at the lecturn (S63-16470). In this view the motion picture cameras and personel are shown documenting the conference (S63-16471). A motion picture cameraman in the balcony is shown filming the audience during a break (S63- 16472). Family members enjoy an exhibit (S63-16473). A young person gets a boost to look in a Gemini Capsule on display (S63-16474). A young person looks at the Gemini Capsule on display (S63-16475). Dr. Robert R. Gilruth is seen at the conference table (S63-16476). Walt Williams is seen in this view at the conference table (S63-16477). Unidentified man sitting next to Walt Williams (S63-16478). (L-R): Seated at the conference table, Dr. Robert Gilruth, Hugh L. Dryden, and Walt Williams (S63- 16479). Group in lobby faces visable, (L-R): Walt Williams, unidentified person, Dr. Robert Gilruth, Congressman (S63-16480). Man in uniform at the lecturn (S63-16481). Astronaut Leroy Gordon Cooper at the lecturn (S63-16482). Astronaut Cooper at the lecturn with a picture on the screen with the title, " Astronaut Names for Spacecraft " (S63-16483). Dr. Gilruth at the lecturn (S63-16484). Walt Williams at the lecturn (S63-16485). Unidentified man at the lecturn (S63-16486). John H. Boynton addresses the Summary Conference (S63-16487). (L-R): Astronaut Leroy Gordon Cooper, Mrs. Cooper, Senator Cris Cole, and Mrs. Cole (S63- 16488). In this view in the lobby, Senator and Mrs. Cris Cole, with Astronaut Gordon Cooper standing near the heatshield, and Mrs. Cooper; next, on the right is a press photographer (S63-16489). (L-R): Astronaut L. Gordon Cooper and Mrs. Cooper, unidentified man, and Senator Walter Richter (S63-16490). (L-R): Eugene Horton, partially obscured, briefs a group on the Mercury Spacecraft, an unidentified person, Harold Ogden, a female senator, Senator Chris Cole, Mrs. Cole, an unidentified female, Senator Walter Richter, Jim Bower, and an unidentified female (S63-16491). In this view, Mrs. Jim Bates is seen in the center, and Senator Walter Richter to the right (S63- 16492). The next three (3) shots are 4X5 CN (S63-16493 - S63-16495). In this view a NASA Space Science Demonstration is seen (S63-16493). In this view a shot of the conference table is seen, and, (L-R): Dr. Robert R. Gilruth, Hugh L. Dryden, Mr. Walter Williams, and an unidentfied man (S63-16494 - S63-16495). HOUSTON, TX

  17. Around Marshall

    NASA Image and Video Library

    1970-01-01

    Dr. Eberhard Rees served as director of the Marshall Space Flight Center from March 1, 1970 until January 19, 1973 when he retired from NASA. Prior to his appointment as Director, Rees served as the Center's deputy director under Dr. Wernher von Braun, 1960-1970. Rees came to the United States as part of the Dr. Wernher von Braun's German Rocket team following World War II. He transferred to Huntsville, Alabama from Fort Bliss, Texas in 1950 to work for the Army's rocket program at Redstone Arsenal. From 1956 to 1960 he served as deputy director of development operations at the Army Ballistic Missile Agency under von Braun. In 1960 Rees was transferred to NASA's Marshall Center.

  18. Members of House Committee on Science and Astronautics Visited MSFC

    NASA Technical Reports Server (NTRS)

    1962-01-01

    The members of the House Committee on Science and Astronautics visited the Marshall Space Flight Center (MSFC) on March 9, 1962 to gather firsthand information of the nation's space exploration program. The congressional group was composed of members of the Subcommittee on Manned Space Flight. The subcommittee was briefed on MSFC's manned space efforts earlier in the day and then inspected mockups of the Saturn I Workshop and the Apollo Telescope Mount, two projects developed by MSFC for the post-Apollo program. In this photograph, MSFC Director, Dr. Wernher von Braun, bids farewell to Texas Democratic Representative Olin E. Teague before departure at the Redstone Arsenal Airstrip.

  19. From the Peenemuende 'Aggregates' to the American moon rocket - The development of the Saturn V Apollo rocket by Werner von Braun's team based on the Peenemuende concept

    NASA Astrophysics Data System (ADS)

    Reisig, G. H. R.

    The origin of active space flight and the important role played in it by the innovations made in the Peenemuende rocket program are discussed. The rocket development carried out by the Werner von Braun team is chronologically recalled. The A4 rocket and its aerodynamic configuration are discussed, including the ballistic demands on its configuration, the development of the Peenemuende supersonic wind tunnel, and the pretesting of the A4 configuration using the A5 rocket. Rocket development in the U.S. from the Redstone to the Saturn is reviewed.

  20. Around Marshall

    NASA Image and Video Library

    1962-10-26

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This construction photo, taken October 26, 1962, depicts a view of the Block House tunnel opening.

  1. Around Marshall

    NASA Image and Video Library

    1962-08-17

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This construction photo taken August 17, 1962 depicts a back side view of the Block House.

  2. Around Marshall

    NASA Image and Video Library

    1962-11-15

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This construction photo, taken November 15, 1962, depicts a view of the Block House.

  3. Around Marshall

    NASA Image and Video Library

    1962-10-08

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This construction photo, taken October 8, 1962, depicts a front view of the Block House nearing completion.

  4. Around Marshall

    NASA Image and Video Library

    1962-01-23

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This photo, taken January 23, 1962, shows the excavation of the Block House site.

  5. Around Marshall

    NASA Image and Video Library

    1962-06-13

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. Construction of the tunnel is depicted in this photo taken June 13, 1962.

  6. Around Marshall

    NASA Image and Video Library

    1962-02-02

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This photo, taken February 2, 1962, shows the excavation of the Block House site.

  7. Integration of unmanned systems for tactical operations within hostile environments

    NASA Astrophysics Data System (ADS)

    Maddux, Gary A.; Bosco, Charles D.; Lawrence, James D.

    2006-05-01

    The University of Alabama in Huntsville (UAH) is currently investigating techniques and technologies for the integration of a small unmanned aerial vehicle (SUAV) with small unmanned ground vehicles (SUGV). Each vehicle has its own set of unique capabilities, but the efficient integration of the two for a specific application requires modifying and integrating both systems. UAH has been flying and testing an autonomously-controlled small helicopter, called the Flying Bassett (Base Airborne Surveillance and Sensing for Emergency Threat Tracking) for over a year. Recently, integrated operations were performed with four SUGVs, the Matilda (Mesa Robotics, Huntsville, AL), the US Navy Vanguard, the UAH Rover, and the Penetrator (Mesa Robotics). The program has progressed from 1) building an air and ground capability for video and infrared surveillance, 2) integration with ground vehicles in realistic scenarios, to 3) deployment and recovery of ground vehicles. The work was done with the cooperation of the US Army at Ft. Benning, GA and Redstone Arsenal, AL, the Federal Bureau of Investigation in Huntsville, AL, the US Naval Reserve in Knoxville, TN, and local emergency organizations. The results so far have shown that when the air and ground systems are employed together, their utility is greatly enhanced.

  8. Hydraulic Testing of Polymer Matrix Composite 102mm Tube Section Technical Report

    DTIC Science & Technology

    2018-04-01

    Technical Report ARWSB-TR-18025 Hydraulic Testing of Polymer Matrix Composite 102mm Tube Section Technical Report Lucas B...1. REPORT DATE (DD-MM-YYYY) April 2018 2. REPORT TYPE Technical 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Hydraulic Testing of...Polymer Matrix Composite 102mm Tube Section Technical Report 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER

  9. Test Technical Manual 2014 GED® Test

    ERIC Educational Resources Information Center

    GED Testing Service, 2014

    2014-01-01

    This manual was written to provide technical information regarding the General Educational Development (GED®) test as evidence that the GED® test is technically sound. Throughout this manual, documentation is provided regarding the development of the GED® test and data collection activities, as well as evidence of reliability and validity. This…

  10. Around Marshall

    NASA Image and Video Library

    1963-10-22

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo shows the progress of the S-IC test stand as of October 22, 1963. Spherical liquid hydrogen tanks can be seen to the left. Just to the lower front of those are the cylindrical liquid oxygen (LOX) tanks.

  11. Around Marshall

    NASA Image and Video Library

    1963-09-05

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. In the center portion of this photograph, taken September 5, 1963, the spherical hydrogen storage tanks are being constructed. One of the massive tower legs of the S-IC test stand is visible to the far right.

  12. Around Marshall

    NASA Image and Video Library

    1961-06-01

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In this photo, taken July 13, 1961, progress is being made with the excavation of the S-IC test stand site. During the digging, a natural spring was disturbed which caused a constant flooding problem. Pumps were used to remove the water all through the construction process and the site is still pumped today.

  13. Around Marshall

    NASA Image and Video Library

    1963-03-29

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In the early stages of excavation, a natural spring was disturbed that caused a water problem which required constant pumping from the site and is even pumped to this day. Behind this reservoir of pumped water is the S-IC test stand boasting its ever-growing four towers as of March 29, 1963.

  14. Around Marshall

    NASA Image and Video Library

    1961-08-05

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In this photograph taken on August 5th, 1961, a back hoe is nearly submerged in water in the test stand site. During the initial digging, the disturbance of a natural spring contributed to constant water problems during the construction process. It was necessary to pump the water from the site on a daily basis and is still pumped from the site today.

  15. Around Marshall

    NASA Image and Video Library

    1961-08-14

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo shows the construction progress of the test stand as of August 14, 1961. Water gushing in from the disturbance of a natural spring contributed to constant water problems during the construction process. It was necessary to pump water from the site on a daily basis and is still pumped from the site today. The equipment is partially submerged in the water emerging from the spring.

  16. Testing Services

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Trace Laboratories is an independent testing laboratory specializing in testing printed circuit boards, automotive products and military hardware. Technical information from NASA Tech Briefs and two subsequent JPL Technical Support packages have assisted Trace in testing surface insulation resistance on printed circuit board materials. Testing time was reduced and customer service was improved because of Jet Propulsion Laboratory technical support packages.

  17. Technical Review Board Chairperson Guidelines for Conducting Technical Review Boards for Rocket Testing

    DTIC Science & Technology

    2011-08-17

    to create a guide for technical review board chairperson conducting technical review boards for rocket testing performed by the Air Force Research ...BOARDS FOR ROCKET TESTING   TABLE OF CONTENTS List of Acronyms 1 Abstract 2 Chapter 1. Introduction 3 Introduction and Research Question 3...boards for rocket testing performed by the Air Force Research Laboratory’s Space Missile Propulsion Division located at Edwards Air Force Base in

  18. Heroes and Legends Exhibit

    NASA Image and Video Library

    2016-11-07

    Inside the Heroes and Legends attraction at the Kennedy Space Center Visitor Complex, the Sigma 7 Mercury spacecraft in this exhibit was piloted by astronaut Wally Schirra during his six-orbit mission on Oct. 3, 1962. For display purposes, it is shown here attached to a Redstone launch vehicle like the one that boosted astronauts Alan Shepard and Gus Grissom on sub-orbital flights in 1961. Schirra's capsule was actually launched by the more powerful Atlas rocket in order to reach orbit. The new facility looks back to the pioneering efforts of Mercury, Gemini and Apollo. It sets the stage by providing the background and context for space exploration and the legendary men and women who pioneered the nation's journey into space.

  19. Around Marshall

    NASA Image and Video Library

    1962-04-16

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. After a 6 month delay in construction due to size reconfiguration of the Saturn booster, the site was revisited for modifications. The original foundation walls built in the prior year had to be torn down and re-poured to accommodate the larger booster. The demolition can be seen in this photograph taken on April 16, 1962.

  20. Around Marshall

    NASA Image and Video Library

    1962-06-13

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. After a six month delay in construction due to size reconfiguration of the Saturn booster, the site was revisited for modifications in March 1962. The original foundation walls built in the prior year were torn down and re-poured to accommodate the larger boosters. This photo depicts that modification progress as of June 13,1962.

  1. Around Marshall

    NASA Image and Video Library

    1962-05-21

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. After a 6 month delay in construction due to size reconfiguration of the Saturn booster, the site was revisited for modifications. The original foundation walls built in the prior year had to be torn down and re-poured to accommodate the larger booster. The demolition can be seen in this photograph taken on May 21, 1962.

  2. Around Marshall

    NASA Image and Video Library

    1961-09-05

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo, taken September 5, 1961, shows pumps used for extracting water emerging form a disturbed natural spring that occurred during the excavation of the site. The pumping became a daily ritual and the site is still pumped today.

  3. Around Marshall

    NASA Image and Video Library

    1961-09-05

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo, taken September 5, 1961, shows the construction of forms which became the concrete foundation for the massive stand. The lower right hand corner reveals a pump used for extracting water emerging from a disturbed natural spring that occurred during excavation of the site. The pumping became a daily ritual and the site is still pumped today.

  4. Evaluating a technical university's placement test using the Rasch measurement model

    NASA Astrophysics Data System (ADS)

    Salleh, Tuan Salwani; Bakri, Norhayati; Zin, Zalhan Mohd

    2016-10-01

    This study discusses the process of validating a mathematics placement test at a technical university. The main objective is to produce a valid and reliable test to measure students' prerequisite knowledge to learn engineering technology mathematics. It is crucial to have a valid and reliable test as the results will be used in a critical decision making to assign students into different groups of Technical Mathematics 1. The placement test which consists of 50 mathematics questions were tested on 82 new diplomas in engineering technology students at a technical university. This study employed rasch measurement model to analyze the data through the Winsteps software. The results revealed that there are ten test questions lower than less able students' ability. Nevertheless, all the ten questions satisfied infit and outfit standard values. Thus, all the questions can be reused in the future placement test at the technical university.

  5. Technical publication transfer test with McDonnell Aircraft Company: MIL-M-28001 (SGML) and MIL-D-28000 Class 1 (IGES)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-06-25

    The CALS Test Network (CTN) conducted a CTN Planned Test (CPT) of several CALS standards related to the transfer of technical publication data: MIL-STD-1840A (1840A), MIL-D-28000 Class I (28000), MIL-M-28001 (28001), and MIL-D-28003 (28003). The test was conducted with the McDonnell Aircraft Company (CMAIR) of St. Louis, Missouri in accordance with part one of CTN Test Plan CTN89-TM-06 and using material from an F-15E technical manual. One focus of the test was the transfer of a moderately large volume of technical publication data. There were 9 text files, 74 Initial Graphics Exchange Specification (IGES) files, and 74 Computer Graphics Metafilemore » (CGM) files in the exchange package. A noteworthy feature of the test was its early attempt to exchange CGM data. Part one of CTN89-TM-06 called for technical publication data to be output from MCAIR's Xyvision system on 9-track magnetic tape. The data was to be in accordance with the 28001 subset of the Standard Generalized Mark-up Language (SGML) and the 28001 Document Type Definition (DTD) that conformed to MIL-M-38784B, the general style and format requirements for technical manuals. Technical illustrations in the manual were to be done in accordance with 28000 Class I (IGES) and 28003 (CGM). Part two of the test called for the test tape to be read into another technical publication system where the text would be modified and the vector illustrations would all be converted to raster, in accordance with MIL-R-28002. This part of the test is not covered in this report.« less

  6. Test and Evaluation of the Navy Technical Information Presentation System (NTIPS) F-14A Field Test Results

    DTIC Science & Technology

    1988-09-01

    Test and Evaluation Report Test and Evaluation of the Navy Technical Information Presentation System (NTIPS) F-14A Field Test Results by .0 Joseph J...PROGRAM PROJECT TASK WORK UNIT Washington, D.C. 20361 ELEMENT NO. NO. NO. ACCESSION NO. OMN 1820 11. TITLE (Include Security Classification) TEST AND...EVALUATION OF THE NAVY TECHNICAL INFORMATION PRESENTATION SYSTEM (NTIPS) F-14A FIELD TEST RESULTS 12. PERSONAL AUTHOR(S) Fuller, Joseph F. (DTRC) Post

  7. Can We Predict Technical Aptitude?: A Systematic Review.

    PubMed

    Louridas, Marisa; Szasz, Peter; de Montbrun, Sandra; Harris, Kenneth A; Grantcharov, Teodor P

    2016-04-01

    To identify background characteristics and cognitive tests that may predict surgical trainees' future technical performance, and therefore be used to supplement existing surgical residency selection criteria. Assessment of technical skills is not commonly incorporated as part of the selection process for surgical trainees in North America. Emerging evidence, however, suggests that not all trainees are capable of reaching technical competence. Therefore, incorporating technical aptitude into selection processes may prove useful. A systematic search was carried out of the MEDLINE, PsycINFO, and Embase online databases to identify all studies that assessed associations between surrogate markers of innate technical abilities in surgical trainees, and whether these abilities correlate with technical performance. The quality of each study was evaluated using the Grading of Recommendations, Assessment, Development, and Evaluation system. A total of 8035 records were identified. After screening by title, abstract, and full text, 52 studies were included. Very few surrogate markers were found to predict technical performance. Significant associations with technical performance were seen for 1 of 23 participant-reported surrogate markers, 2 of 25 visual spatial tests, and 2 of 19 dexterity tests. The assessment of trainee Basic Performance Resources predicted technical performance in 62% and 75% of participants. To date, no single test has been shown to reliably predict the technical performance of surgical trainees. Strategies that rely on assessing multiple innate abilities, their interaction, and their relationship with technical skill may ultimately be more likely to serve as reliable predictors of future surgical performance.

  8. Around Marshall

    NASA Image and Video Library

    1963-02-04

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This photograph taken February 4, 1963, gives an impressive look at the Block House looking directly through the ever-growing four towers of the S-IC Test Stand.

  9. Around Marshall

    NASA Image and Video Library

    1962-07-03

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This construction photo taken July 3, 1962 depicts the Block House with a portion of its concrete walls poured and exposed while many are still in the forms stage.

  10. Construction Progress of the S-IC Test Stand-Pumps

    NASA Technical Reports Server (NTRS)

    1962-01-01

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army's Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo, taken April 4, 1961, shows the S-IC test stand dry once again when workers resumed construction after a 6 month delay due to booster size reconfiguration back in September of 1961. The disturbance of a natural spring during the excavation of the site required water to be pumped from the site continuously. The site was completely flooded after the pumps were shut down during the construction delay.

  11. 42 CFR 493.1413 - Standard; Technical consultant responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Standard; Technical consultant responsibilities. 493.1413 Section 493.1413 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH... Nonwaived Testing Laboratories Performing Moderate Complexity Testing § 493.1413 Standard; Technical...

  12. A comparison of the toxicity of synergized and technical formulations of permethrin, sumithrin, and resmethrin to trout.

    PubMed

    Paul, E A; Simonin, H A; Tomajer, T M

    2005-02-01

    Synthetic pyrethroids often have synergists added to improve effectiveness, yet decisions regarding the use of these pesticides are often based upon toxicity tests using technical material without the synergist, piperonyl butoxide. We conducted toxicity tests with brook trout (Salvelinus fontinalis) and brown trout (Salmo trutta) to compare the toxicity of synergized and technical formulations of permethrin, sumithrin, and resmethrin. We found a significant increase in toxicity in the synergized permethrin formulation using traditional 24, 48, and 96-h tests, relative to tests with the technical formulation. However, there was little difference in toxicity between synergized and technical sumithrin until 48 h had elapsed. Many test fish were strongly intoxicated by either formulation of permethrin or sumithrin, but the synergized formulations of both chemicals affected fish at lower concentrations. Intoxication was potentially severe enough to reduce the survival of these fish in the wild. Following short (6-h) exposures, we also found a larger difference in the number of fish that died or became intoxicated between the synergized and technical formulations of permethrin and sumithrin. Finally, we tested the ability of exposed fish to swim against a current. Fish exposed for 6 h to synergized permethrin and resmethrin had far less swimming stamina than those exposed to technical formulations. We found no difference in the effect on swimming between the synergized and technical formulation of sumithrin. In general, the synergized formulations of these chemicals appeared to cause a faster response than the technical formulations. This response increases the lethal and sublethal impacts of the insecticides. We also found that sumithrin was the least toxic of the three pyrethroids. Since the maximum application rate of sumithrin is half that of the other two pyrethroids, the potential risk to wild trout in streams may be reduced.

  13. Technical and physical determinants of soccer match-play performance in elite youth soccer players.

    PubMed

    Rowat, Owain; Fenner, Jonathan; Unnithan, Viswanath

    2017-04-01

    The aim of this study was to evaluate whether physical performance characteristics could be a better predictor than technical skills in determining the technical level of county soccer players in a match situation. With institutional ethics approval, 25 male youth soccer players aged 16-18.5 years from a professional soccer academy in South East Asia were selected and height and body mass were recorded. Players were tested for sexual maturity (pubertal development scale [PDS] self-assessment), aerobic capacity (yo-yo intermittent recovery test level 1 [YYIR1]), repeated sprint ability (7 x 35 m sprints) acceleration (15 m sprint) and four soccer skills tests (dribble with pass, dribbling speed, passing and shooting accuracy). Players' technical ability during match play was assessed in small-sided games of soccer (5 v 5) using a novel game technical scoring chart (scoring chart completed by coaches to assess technical performance in a match situation) developed from criteria (e.g., first touch, dribbling and two footedness) used by youth soccer coaches for talent identification. A Spearman's rank correlation showed the YYIR1 test and 15 m sprint test were limited in predicting technical match performance (r=0.03, P=0.88, r=-0.23, P=0.32 respectively). A Pearson product moment correlation showed that the repeated sprint test was also limited in predicting technical match performance (r=-0.34, P=0.14). A dribbling skill with a pass was found to be the best determinant of a player's technical ability in a match (r=-0.57, P=0.00). Talent identification and selection programs in Asian youth soccer should include a dribbling skill performed with a pass.

  14. Around Marshall

    NASA Image and Video Library

    1962-03-31

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September 1961 as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction about to resume, portable, floating pump stations were placed in the site to drain the flood waters caused by a disturbed natural spring months prior during excavation. In this March 31, 1962 photo, the foundation walls can once again be seen.

  15. Around Marshall

    NASA Image and Video Library

    1961-12-22

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken December 22, 1961, shows danger signs posted around the abandoned site with floods nearing the top. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  16. Around Marshall

    NASA Image and Video Library

    1962-03-15

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken March 15, 1962, shows danger signs posted around the abandoned, flooded site. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  17. Around Marshall

    NASA Image and Video Library

    1963-09-25

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built to the northeast of the stand was a newly constructed Pump House. Its function was to provide water to the stand to prevent melting damage during testing. The water was sprayed through small holes in the stand’s 1900 ton flame deflector at the rate of 320,000 gallons per minute. This photograph, taken September 25, 1963, depicts the construction progress of the Pump House and massive round water tanks on the right.

  18. Around Marshall

    NASA Image and Video Library

    1962-03-20

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction about to resume, portable floating pump stations were placed in the site, as seen in this March 20, 1962 photo, to drain the flood waters caused by a disturbed natural spring months prior during excavation.

  19. Around Marshall

    NASA Image and Video Library

    1961-12-04

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken December 4, 1961, shows the abandoned site with floods at the 11 ft mark. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  20. Around Marshall

    NASA Image and Video Library

    1961-12-18

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken December 18, 1961, shows the abandoned site entirely flooded. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  1. Around Marshall

    NASA Image and Video Library

    1961-12-11

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken December 11, 1961, shows the abandoned site with floods above the 18 ft mark. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  2. Around Marshall

    NASA Image and Video Library

    1961-12-01

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken December 1, 1961, shows the abandoned site with floods at the 6 ft mark. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  3. Around Marshall

    NASA Image and Video Library

    1962-04-04

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo, taken April 4, 1961, shows the S-IC test stand dry once again when workers resumed construction after a 6 month delay due to booster size reconfiguration back in September of 1961. The disturbance of a natural spring during the excavation of the site required water to be pumped from the site continuously. The site was completely flooded after the pumps were shut down during the construction delay.

  4. n/a

    NASA Image and Video Library

    1961-12-11

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken December 11, 1961, shows the abandoned site with floods above the 18 ft mark. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  5. Around Marshall

    NASA Image and Video Library

    1961-12-08

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken December 8, 1961, shows the abandoned site with floods at the 16 ft mark. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  6. Around Marshall

    NASA Image and Video Library

    1961-12-04

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand would have to be modified. With construction delayed, and pumps turned off, this photo, taken December 4, 1961, shows the abandoned site with floods at the 11 ft mark. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  7. Around Marshall

    NASA Image and Video Library

    1961-12-14

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken December 14, 1961, shows the abandoned site entirely flooded. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  8. Around Marshall

    NASA Image and Video Library

    1962-02-02

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken February 2, 1962, shows the abandoned flooded site. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  9. The Systems Test Architect: Enabling The Leap From Testable To Tested

    DTIC Science & Technology

    2016-09-01

    engineering process requires an interdisciplinary approach, involving both technical and managerial disciplines applied to the synthesis and integration...relationship between the technical and managerial aspects of systems engineering. TP-2003-020-01 describes measurement as having the following...it is evident that DOD makes great strides to tackle both the managerial and technical aspects of test and evaluation within the systems

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gauglitz, Phillip A.; Bontha, Jagannadha R.; Daniel, Richard C.

    The Hanford Waste Treatment and Immobilization Plant (WTP) is currently being designed and constructed to pretreat and vitrify a large portion of the waste in the 177 underground waste storage tanks at the Hanford Site. A number of technical issues related to the design of the pretreatment facility (PTF) of the WTP have been identified. These issues must be resolved prior to the U.S. Department of Energy (DOE) Office of River Protection (ORP) reaching a decision to proceed with engineering, procurement, and construction activities for the PTF. One of the issues is Technical Issue T1 - Hydrogen Gas Release frommore » Vessels (hereafter referred to as T1). The focus of T1 is identifying controls for hydrogen release and completing any testing required to close the technical issue. In advance of selecting specific controls for hydrogen gas safety, a number of preliminary technical studies were initiated to support anticipated future testing and to improve the understanding of hydrogen gas generation, retention, and release within PTF vessels. These activities supported the development of a plan defining an overall strategy and approach for addressing T1 and achieving technical endpoints identified for T1. Preliminary studies also supported the development of a test plan for conducting testing and analysis to support closing T1. Both of these plans were developed in advance of selecting specific controls, and in the course of working on T1 it was decided that the testing and analysis identified in the test plan were not immediately needed. However, planning activities and preliminary studies led to significant technical progress in a number of areas. This report summarizes the progress to date from the preliminary technical studies. The technical results in this report should not be used for WTP design or safety and hazards analyses and technical results are marked with the following statement: “Preliminary Technical Results for Planning – Not to be used for WTP Design or Safety Analyses.”« less

  11. Scientific and technical complex for modeling, researching and testing of rocket-space vehicles’ electric power installations

    NASA Astrophysics Data System (ADS)

    Bezruchko, Konstantin; Davidov, Albert

    2009-01-01

    In the given article scientific and technical complex for modeling, researching and testing of rocket-space vehicles' power installations which was created in Power Source Laboratory of National Aerospace University "KhAI" is described. This scientific and technical complex gives the opportunity to replace the full-sized tests on model tests and to reduce financial and temporary inputs at modeling, researching and testing of rocket-space vehicles' power installations. Using the given complex it is possible to solve the problems of designing and researching of rocket-space vehicles' power installations efficiently, and also to provide experimental researches of physical processes and tests of solar and chemical batteries of rocket-space complexes and space vehicles. Scientific and technical complex also allows providing accelerated tests, diagnostics, life-time control and restoring of chemical accumulators for rocket-space vehicles' power supply systems.

  12. Technical Evaluation Motor No. 10 (TEM-10)

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Technical Evaluation Motor No. 10 (TEM-10) was static fired on 27 Apr. 1993 at the Thiokol Corporation full-scale motor static test bay, T-24. This final test report documents the procedures, performance, and results of the static test firing of TEM-10. All observations, discussions, conclusions, and recommendations contained are final. Included is a presentation and discussion of TEM-10 performance, anomalies, and test results in concurrence with the objectives outlined in CTP-0110, Revision D, Space Shuttle Technical Evaluation Motor No. 10 (TEM-10) Static Fire Test Plan.

  13. Astronaut Alan Shepard is rescued by helicopter at end of MR-3 flight

    NASA Image and Video Library

    1961-05-05

    S88-31376 (5 May 1961) --- Astronaut Alan B. Shepard Jr., pilot of the Mercury-Redstone 3 (MR-3) suborbital spaceflight, is retrieved by a helicopter from the USS Lake Champlain during recovery operations in the western Atlantic Ocean. Shepard and the Mercury spacecraft designated the ?Freedom 7? (floating in water below) were flown to the deck of the recovery ship within 11 minutes of splashdown. MR-3 was the United States? first manned space mission. The spacecraft attained a maximum speed of 5,180 miles per hour, reached an altitude of 116 1/2 statute miles, and landed 302 statute miles downrange from Cape Canaveral, Florida. The suborbital mission lasted 15 minutes and 22 seconds. Photo credit: NASA or National Aeronautics and Space Administration

  14. Wernher von Braun

    NASA Image and Video Library

    1977-06-16

    Dr. Wernher von Braun served as Marshall Space Flight Center's first director from July 1, 1960 until January 27, 1970, when he was appointed NASA Deputy Associate Administrator for Planning. Following World War II, Dr. von Braun and his German colleagues arrived in the United States under Project Paper Clip to continue their rocket development work. In 1950, von Braun and his rocket team were transferred from Ft. Bliss, Texas to Huntsville, Alabama to work for the Army's rocket program at Redstone Arsenal and later, NASA's Marshall Space Flight Center. Under von Braun's leadership, Marshall developed the Saturn V launch vehicle which took Apollo astronauts to the moon. Dr. von Braun died in Alexandria, Va., on June 16, 1977, seven years after his NASA appointment. This photo was taken at the site where he was laid to rest.

  15. 41 CFR 105-50.001-5 - Specialized or technical services.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., technical tests and evaluations, technical information, training activities, surveys, reports, documents... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Specialized or technical... TECHNICAL SERVICES TO STATE AND LOCAL UNITS OF GOVERNMENT § 105-50.001-5 Specialized or technical services...

  16. Testing the performance of technical trading rules in the Chinese markets based on superior predictive test

    NASA Astrophysics Data System (ADS)

    Wang, Shan; Jiang, Zhi-Qiang; Li, Sai-Ping; Zhou, Wei-Xing

    2015-12-01

    Technical trading rules have a long history of being used by practitioners in financial markets. The profitable ability and efficiency of technical trading rules are yet controversial. In this paper, we test the performance of more than seven thousand traditional technical trading rules on the Shanghai Securities Composite Index (SSCI) from May 21, 1992 through June 30, 2013 and China Securities Index 300 (CSI 300) from April 8, 2005 through June 30, 2013 to check whether an effective trading strategy could be found by using the performance measurements based on the return and Sharpe ratio. To correct for the influence of the data-snooping effect, we adopt the Superior Predictive Ability test to evaluate if there exists a trading rule that can significantly outperform the benchmark. The result shows that for SSCI, technical trading rules offer significant profitability, while for CSI 300, this ability is lost. We further partition the SSCI into two sub-series and find that the efficiency of technical trading in sub-series, which have exactly the same spanning period as that of CSI 300, is severely weakened. By testing the trading rules on both indexes with a five-year moving window, we find that during the financial bubble from 2005 to 2007, the effectiveness of technical trading rules is greatly improved. This is consistent with the predictive ability of technical trading rules which appears when the market is less efficient.

  17. SELECTIVE DISSEMINATION OF INFORMATION (SDI). VOLUME I, PILOT TEST AT U.S. ARMY NATICK LABORATORIES. FINAL REPORT. ARMY TECHNICAL LIBRARY IMPROVEMENT STUDIES (ATLIS), REPORT NO. 15.

    ERIC Educational Resources Information Center

    BIVONA, WILLIAM A.

    THIS VOLUME PRESENTS THE RESULTS OF A NINE-MONTH TEST OF A PROTOTYPE SELECTIVE DISSEMINATION OF INFORMATION (SDI) SYSTEM DEVELOPED FOR THE ARMY TECHNICAL LIBRARIES. DURING THE PILOT TEST ONE THOUSAND DOCUMENTS WERE CATALOGED, INDEXED, AND DISSEMINATED TO TWENTY-FIVE SCIENTIFIC AND TECHNICAL PERSONNEL. MATCHING OF THE INTEREST PROFILES OF THESE…

  18. Technical Evaluation Motor No. 7 (TEM-07)

    NASA Technical Reports Server (NTRS)

    Hugh, Phil

    1991-01-01

    Technical Evaluation Motor Number 7 (TEM-7) was a full scale, full-duration static test firing of a high performance motor (HPM) configuration solid rocket motor (SRM) with nozzle vectoring. The static test fire occurred on 11 December 1990 at the Thiokol Corporation Static Test Bay T-97. Documented here are the procedures, performance, and results available through 22 January 1991. Critical post test hardware activities and assessment of the test data are not complete. A completed test report will be submitted 60 days after the test date. Included here is a presentation and discussion of the TEM-7 performance, anomalies, and test result concurrence with the objectives outlined in CTP-0107 Revision A, Space Shuttle Technical Evaluation Motor number 7 (TEM-07) Static Fire Test Plan.

  19. Technical Evaluation Motor No. 7 (TEM-7)

    NASA Technical Reports Server (NTRS)

    Hughes, Phil

    1991-01-01

    The Technical Evaluation Motor No. 7 (TEM-7) test was a full-scale, full duration static test firing of a high performance motor-configuration solid rocket motor with nozzle vectoring. The final test report documents the procedures, performance, and results of the static test firing of TEM-7. All observations, discussions, conclusions, and recommendations included in the report are complete and final except for the TEM-7 fixed housing unbond investigation. A presentation and discussion of TEM-7 performance, anomalies, and test result concurrence with the objectives outlined in CTP-0107, Rev A, Space Shuttle Technical Evaluation Motor No. 7 (TEM-7) Static Fire Test Plan are included.

  20. Around Marshall

    NASA Image and Video Library

    1963-11-20

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. North of the massive S-IC test stand, the F-1 Engine test stand was built. Designed to assist in the development of the F-1 Engine, the F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo shows the progress of the F-1 Test Stand as of November 20, 1963.

  1. Around Marshall

    NASA Image and Video Library

    1962-07-03

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. North of the massive S-IC test stand, the F-1 Engine test stand was built. Designed to assist in the development of the F-1 Engine, the F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo depicts the construction of the F-1 test stand as of July 3, 1963. All four of its tower legs are well underway.

  2. Around Marshall

    NASA Image and Video Library

    1963-04-04

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. North of the massive S-IC test stand, the F-1 Engine test stand was built. Designed to assist in the development of the F-1 Engine, the F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo, taken April 4, 1963 depicts the construction of the F-1 test stand foundation walls.

  3. Around Marshall

    NASA Image and Video Library

    1963-04-17

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. North of the massive S-IC test stand, the F-1 Engine test stand was built. Designed to assist in the development of the F-1 Engine, the F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo, taken April 17, 1963 depicts the construction of the F-1 test stand foundation walls.

  4. Around Marshall

    NASA Image and Video Library

    1963-09-05

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. North of the massive S-IC test stand, the F-1 Engine test stand was built. Designed to assist in the development of the F-1 Engine, the F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo depicts the construction of the F-1 test stand as of September 5, 1963.

  5. n/a

    NASA Image and Video Library

    1962-10-26

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the S-IC test stand, related facilities were built during this time. Built to the north of the massive S-IC test stand, was the F-1 Engine test stand. The F-1 test stand, a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base, was designed to assist in the development of the F-1 Engine. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo, taken October 26, 1962, depicts the excavation process of the single engine F-1 stand.

  6. Around Marshall

    NASA Image and Video Library

    1963-09-30

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. North of the massive S-IC test stand, the F-1 Engine test stand was built. Designed to assist in the development of the F-1 Engine, the F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo depicts the construction of the F-1 test stand as of September 30, 1963.

  7. Around Marshall

    NASA Image and Video Library

    1963-06-24

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. North of the massive S-IC test stand, the F-1 Engine test stand was built. Designed to assist in the development of the F-1 Engine, the F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo depicts the construction of the F-1 test stand as of June 24, 1963. Two if its four tower legs are underway.

  8. n/a

    NASA Image and Video Library

    1962-11-15

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the S-IC test stand, related facilities were built during this time. Built to the north of the massive S-IC test stand, was the F-1 Engine test stand. The F-1 test stand, a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base, was designed to assist in the development of the F-1 Engine. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo, taken November 15, 1962, depicts the excavation process of the single engine F-1 stand site.

  9. Around Marshall

    NASA Image and Video Library

    1963-10-22

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Northeast of the massive S-IC test stand, the F-1 Engine test stand was built. The F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base, and was designed to assist in the development of the F-1 Engine. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo depicts the fuel tanks that housed kerosene and just beyond those is the F-1 test stand.

  10. Predictive value of background experiences and visual spatial ability testing on laparoscopic baseline performance among residents entering postgraduate surgical training.

    PubMed

    Louridas, Marisa; Quinn, Lauren E; Grantcharov, Teodor P

    2016-03-01

    Emerging evidence suggests that despite dedicated practice, not all surgical trainees have the ability to reach technical competency in minimally invasive techniques. While selecting residents that have the ability to reach technical competence is important, evidence to guide the incorporation of technical ability into selection processes is limited. Therefore, the purpose of the present study was to evaluate whether background experiences and 2D-3D visual spatial test results are predictive of baseline laparoscopic skill for the novice surgical trainee. First-year residents were studied. Demographic data and background surgical and non-surgical experiences were obtained using a questionnaire. Visual spatial ability was evaluated using the PicSOr, cube comparison (CC) and card rotation (CR) tests. Technical skill was assessed using the camera navigation (LCN) task and laparoscopic circle cut (LCC) task. Resident performance on these technical tasks was compared and correlated with the questionnaire and visual spatial findings. Previous experience in observing laparoscopic procedures was associated with significantly better LCN performance, and experience in navigating the laparoscopic camera was associated with significantly better LCC task results. Residents who scored higher on the CC test demonstrated a more accurate LCN path length score (r s(PL) = -0.36, p = 0.03) and angle path (r s(AP) = -0.426, p = 0.01) score when completing the LCN task. No other significant correlations were found between the visual spatial tests (PicSOr, CC or CR) and LCC performance. While identifying selection tests for incoming surgical trainees that predict technical skill performance is appealing, the surrogate markers evaluated correlate with specific metrics of surgical performance related to a single task but do not appear to reliably predict technical performance of different laparoscopic tasks. Predicting the acquisition of technical skills will require the development of a series of evidence-based tests that measure a number of innate abilities as well as their inherent interactions.

  11. Reducing measurement errors during functional capacity tests in elders.

    PubMed

    da Silva, Mariane Eichendorf; Orssatto, Lucas Bet da Rosa; Bezerra, Ewertton de Souza; Silva, Diego Augusto Santos; Moura, Bruno Monteiro de; Diefenthaeler, Fernando; Freitas, Cíntia de la Rocha

    2018-06-01

    Accuracy is essential to the validity of functional capacity measurements. To evaluate the error of measurement of functional capacity tests for elders and suggest the use of the technical error of measurement and credibility coefficient. Twenty elders (65.8 ± 4.5 years) completed six functional capacity tests that were simultaneously filmed and timed by four evaluators by means of a chronometer. A fifth evaluator timed the tests by analyzing the videos (reference data). The means of most evaluators for most tests were different from the reference (p < 0.05), except for two evaluators for two different tests. There were different technical error of measurement between tests and evaluators. The Bland-Altman test showed difference in the concordance of the results between methods. Short duration tests showed higher technical error of measurement than longer tests. In summary, tests timed by a chronometer underestimate the real results of the functional capacity. Difference between evaluators' reaction time and perception to determine the start and the end of the tests would justify the errors of measurement. Calculation of the technical error of measurement or the use of the camera can increase data validity.

  12. Charger 1: A New Facility for Z-Pinch Research

    NASA Technical Reports Server (NTRS)

    Taylor, Brian; Cassibry, Jason; Cortez, Ross; Doughty, Glen; Adams, Robert; DeCicco, Anthony

    2017-01-01

    Charger 1 is a multipurpose pulsed power laboratory located on Redstone Arsenal, with a focus on fusion propulsion relevant experiments involving testing z-pinch diodes, pulsed magnetic nozzle and other related physics experiments. UAH and its team of pulsed power researchers are investigating ways to increase and optimize fusion production from Charger 1. Currently the team has reached high-power testing. Due to the unique safety issues related to high power operations the UAH/MSFC team has slowed repair efforts to develop safety and operations protocols. The facility is expected to be operational by the time DZP 2017 convenes. Charger 1 began life as the Decade Module 2, an experimental prototype built to prove the Decade Quad pinch configuration. The system was donated to UAH by the Defense Threat Reduction Agency (DRTA) in 2012. For the past 5 years a UAH/MSFC/Boeing team has worked to refurbish, assemble and test the system. With completion of high power testing in summer 2017 Charger 1 will become operational for experimentation. Charger 1 utilizes a Marx Bank of 72 100-kV capacitors that are charged in parallel and discharged in series. The Marx output is compressed to a pulse width of approximately 200 ns via a pulse forming network of 32 coaxial stainless steel tubes using water as a dielectric. After pulse compression a set of SF6 switches are triggered, allowing the wave front to propagate through the output line to the load. Charger 1 is capable of storing 572-kJ of energy and time compressing discharge to less than 250 ns discharge time producing a discharge of about 1 TW of discharge with 1 MV and 1 MA peak voltage and current, respectively. This capability will be used to study energy yield scaling and physics from solid density target as applied to advanced propulsion research.

  13. Wormhole Formation in RSRM Nozzle Joint Backfill

    NASA Technical Reports Server (NTRS)

    Stevens, J.

    2000-01-01

    The RSRM nozzle uses a barrier of RTV rubber upstream of the nozzle O-ring seals. Post flight inspection of the RSRM nozzle continues to reveal occurrence of "wormholes" into the RTV backfill. The term "wormholes", sometimes called "gas paths", indicates a gas flow path not caused by pre-existing voids, but by a little-understood internal failure mode of the material during motor operation. Fundamental understanding of the mechanics of the RSRM nozzle joints during motor operation, nonlinear viscoelastic characterization of the RTV backfill material, identification of the conditions that predispose the RTV to form wormholes, and screening of candidate replacement materials is being pursued by a joint effort between Thiokol Propulsion, NASA, and the Army Propulsion & Structures Directorate at Redstone Arsenal. The performance of the RTV backfill in the joint is controlled by the joint environment. Joint movement, which applies a tension and shear load on the material, coupled with the introduction of high pressure gas in combination create an environment that exceeds the capability of the material to withstand the wormhole effect. Little data exists to evaluate why the material fails under the modeled joint conditions, so an effort to characterize and evaluate the material under these conditions was undertaken. Viscoelastic property data from characterization testing will anchor structural analysis models. Data over a range of temperatures, environmental pressures, and strain rates was used to develop a nonlinear viscoelastic model to predict material performance, develop criteria for replacement materials, and quantify material properties influencing wormhole growth. Three joint simulation analogs were developed to analyze and validate joint thermal barrier (backfill) material performance. Two exploratory tests focus on detection of wormhole failure under specific motor operating conditions. A "validation" test system provides data to "validate" computer models and predictions. Finally, two candidate replacement materials are being screened and "validated" using the developed test systems.

  14. Technical Manual for the Conceptual Learning and Development Assessment Series II: Cutting Tool. Technical Report No. 435. Reprinted December 1977.

    ERIC Educational Resources Information Center

    DiLuzio, Geneva J.; And Others

    This document accompanies Conceptual Learning and Development Assessment Series II: Cutting Tool, a test constructed to chart the conceptual development of individuals. As a technical manual, it contains information on the rationale, development, standardization, and reliability of the test, as well as essential information and statistical data…

  15. Technical Manual for the Conceptual Learning and Development Assessment Series IV: Tree. Technical Report No. 437. Reprinted December 1977.

    ERIC Educational Resources Information Center

    DiLuzio, Geneva J.; And Others

    This document accompanies the Conceptual Learning and Development Assessment Series III: Tree, a test constructed to chart the conceptual development of individuals. As a technical manual, it contains information on the rationale, development, standardization, and reliability of the test, as well as essential information and statistical data for…

  16. Technical Manual for the Conceptual Learning and Development Assessment Series II: Equilateral Triangle. Technical Report No. 434. Reprinted December 1977.

    ERIC Educational Resources Information Center

    DiLuzio, Geneva J.; And Others

    This document accompanies the Conceptual Learning and Development Assessment Series I: Equilateral Triangle, a test constructed to chart the conceptual developemnt of individuals. As a technical manual, it contains information on the rationale, development, standardization, and reliability of the test, as well as essential information and…

  17. Technical Manual for the Conceptual Learning and Development Assessment Series III: Noun. Technical Report No. 436. Reprinted December 1977.

    ERIC Educational Resources Information Center

    DiLuzio, Geneva J.; And Others

    This document accompanies the Conceptual Learning and Development Assessment Series IV: Noun, a test constructed to chart the conceptual development of individuals. As a technical manual, it contains information on the rationale, development, standardization, and reliability of the test, as well as essential information and statistical data for…

  18. Framework conditions and requirements to ensure the technical functional safety of reprocessed medical devices.

    PubMed

    Kraft, Marc

    2008-09-03

    Testing and restoring technical-functional safety is an essential part of medical device reprocessing. Technical functional tests have to be carried out on the medical device in the course of the validation of reprocessing procedures. These ensure (in addition to the hygiene tests) that the reprocessing procedure is suitable for the medical device. Functional tests are, however, also a part of reprocessing procedures. As a stage in the reprocessing, they ensure for the individual medical device that no damage or other changes limit the performance. When determining which technical-functional tests are to be carried out, the current technological standard has to be taken into account in the form of product-specific and process-oriented norms. Product-specific norms primarily define safety-relevant requirements. The risk management method described in DIN EN ISO 14971 is the basis for recognising hazards; the likelihood of such hazards arising can be minimised through additional technical-functional tests, which may not yet have been standardised. Risk management is part of a quality management system, which must be bindingly certified for manufacturers and processors of critical medical devices with particularly high processing demands by a body accredited by the competent authority.

  19. Framework conditions and requirements to ensure the technical functional safety of reprocessed medical devices

    PubMed Central

    Kraft, Marc

    2008-01-01

    Testing and restoring technical-functional safety is an essential part of medical device reprocessing. Technical functional tests have to be carried out on the medical device in the course of the validation of reprocessing procedures. These ensure (in addition to the hygiene tests) that the reprocessing procedure is suitable for the medical device. Functional tests are, however, also a part of reprocessing procedures. As a stage in the reprocessing, they ensure for the individual medical device that no damage or other changes limit the performance. When determining which technical-functional tests are to be carried out, the current technological standard has to be taken into account in the form of product-specific and process-oriented norms. Product-specific norms primarily define safety-relevant requirements. The risk management method described in DIN EN ISO 14971 is the basis for recognising hazards; the likelihood of such hazards arising can be minimised through additional technical-functional tests, which may not yet have been standardised. Risk management is part of a quality management system, which must be bindingly certified for manufacturers and processors of critical medical devices with particularly high processing demands by a body accredited by the competent authority. PMID:20204095

  20. Control of Technology Transfer at JPL

    NASA Technical Reports Server (NTRS)

    Oliver, Ronald

    2006-01-01

    Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software

  1. 42 CFR 493.1449 - Standard; Technical supervisor qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... service in which the laboratory performs high complexity tests or procedures. The director of a laboratory... may perform anatomic and clinical laboratory procedures and tests in all specialties and... tests in the subspecialty of bacteriology, the individual functioning as the technical supervisor must...

  2. [NASA/DOD Aerospace Knowledge Diffusion Research Project. Report 3:] Technical communications in aeronautics: Results of an exploratory study. An analysis of profit managers' and nonprofit managers' responses

    NASA Technical Reports Server (NTRS)

    Pinelli, Thomas E.; Glassman, Myron; Barclay, Rebecca O.; Oliu, Walter E.

    1989-01-01

    Data collected from an exploratory study concerned with the technical communications practices of aerospace engineers and scientists were analyzed to test the primary assumption that profit and nonprofit managers in the aerospace community have different technical communications practices. Five assumptions were established for the analysis. Profit and nonprofit managers in the aerospace community were found to have different technical communications practices for one of the five assumptions tested. It was, therefore, concluded that profit and nonprofit managers in the aerospace community do not have different technical communications practices.

  3. 42 CFR 493.1451 - Standard: Technical supervisor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... testing samples; and (vi) Assessment of problem solving skills; and (9) Evaluating and documenting the... analysis and reporting of test results; (5) Resolving technical problems and ensuring that remedial actions...

  4. 42 CFR 493.1413 - Standard; Technical consultant responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... consultant responsibilities. The technical consultant is responsible for the technical and scientific... of performance of instrument maintenance and function checks; (v) Assessment of test performance...

  5. 42 CFR 493.1413 - Standard; Technical consultant responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... consultant responsibilities. The technical consultant is responsible for the technical and scientific... of performance of instrument maintenance and function checks; (v) Assessment of test performance...

  6. NASA’s Super Guppy Transports SLS Flight Hardware to Kennedy Space Center

    NASA Image and Video Library

    2018-04-03

    NASA's Super Guppy aircraft prepares to depart the U.S. Army’s Redstone Airfield in Huntsville, Alabama, April 3, with flight hardware for NASA’s Space Launch System – the agency’s new, deep-space rocket that will enable astronauts to begin their journey to explore destinations far into the solar system. The Guppy will deliver the Orion stage adapter to NASA’s Kennedy Space Center in Florida for flight preparations. On Exploration Mission-1, the first integrated flight of the SLS and the Orion spacecraft, the adapter will connect Orion to the rocket and carry 13 CubeSats as secondary payloads. SLS will send Orion beyond the Moon, about 280,000 miles from Earth. This is farther from Earth than any spacecraft built for humans has ever traveled. For more information about SLS, visit nasa.gov/sls.

  7. KSC-2011-3332

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- Invited guests attending a celebration at Complex 5/6 on Cape Canaveral Air Force Station in Florida tour the blockhouse. The celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  8. KSC-2011-3322

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- Invited guests and media representatives attend a celebration at Complex 5/6 on Cape Canaveral Air Force Station in Florida. The celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  9. KSC-2011-3314

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- Mercury astronaut Scott Carpenter participates in a celebration at Complex 5/6 on Cape Canaveral Air Force Station in Florida. The celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  10. KSC-2011-3316

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- Invited guests attend a celebration at Complex 5/6 on Cape Canaveral Air Force Station in Florida. The celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  11. KSC-2011-3328

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- NASA Administrator Charlie Bolden addresses the audience during a celebration at Complex 5/6 on Cape Canaveral Air Force Station in Florida. The celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  12. KSC-2011-3320

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- Invited guests of all ages attend a celebration at Complex 5/6 on Cape Canaveral Air Force Station in Florida. The celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  13. KSC-2011-3326

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- Invited guests enjoy the program presented at a celebration at Complex 5/6 on Cape Canaveral Air Force Station in Florida. The celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  14. Around Marshall

    NASA Image and Video Library

    1962-03-31

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow tunnel which housed the cables for the controls. Again to the east, just south of the Block House, was a newly constructed Pump House. Its function was to provide water to the stand to prevent melting damage during testing. The water was sprayed through small holes in the stand’s 1900 ton water deflector at the rate of 320,000 gallons per minute. In this photo, taken March 20, 1962, construction of the Pump House area is well underway.

  15. Around Marshall

    NASA Image and Video Library

    1963-08-12

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built to the east was a newly constructed Pump House. Its function was to provide water to the stand to prevent melting damage during testing. The water was sprayed through small holes in the stand’s 1900 ton flame deflector at the rate of 320,000 gallons per minute. In this photo, taken August 12, 1963, the S-IC stand has received some of its internal components. Directly in the center is the framework that houses the flame deflector. The F-1 test stand, designed and built to test a single F-1 engine, can be seen on the left side of the photo.

  16. Technical Manual: 2002 Series GED Tests

    ERIC Educational Resources Information Center

    Ezzelle, Carol; Setzer, J. Carl

    2009-01-01

    This manual was written to provide technical information regarding the 2002 Series GED (General Educational Development) Tests. Throughout this manual, documentation is provided regarding the development of the GED Tests, data collection activities, as well as reliability and validity evidence. The purpose of this manual is to provide evidence…

  17. Technical Assistance to Developers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rockward, Tommy; Borup, Rodney L.; Garzon, Fernando H.

    2012-07-17

    This task supports the allowance of technical assistance to fuel-cell component and system developers as directed by the DOE. This task includes testing of novel materials and participation in the further development and validation of single cell test protocols. This task also covers technical assistance to DOE Working Groups, the U.S. Council for Automotive Research (USCAR) and the USCAR/DOE Driving Research and Innovation for Vehicle efficiency and Energy sustainability (U.S. Drive) Fuel Cell Technology Team. Assistance includes technical validation of new fuel cell materials and methods, single cell fuel cell testing to support the development of targets and test protocols,more » and regular advisory participation in other working groups and reviews. This assistance is made available to PEM fuel cell developers by request and DOE Approval. The objectives are to: (1) Support technically, as directed by DOE, fuel cell component and system developers; (2) Assess fuel cell materials and components and give feedback to developers; (3) Assist the DOE Durability Working Group with the development of various new material durability Testing protocols; and (4) Provide support to the U.S. Council for Automotive Research (USCAR) and the USCAR/DOE Fuel Cell Technology Team. FY2012 specific technical objectives are: (1) Evaluate novel MPL materials; (2) Develop of startup/ shutdown protocol; (3) Test the impact of hydrophobic treatment on graphite bi-polar plates; (4) Perform complete diagnostics on metal bi-polar plates for corrosion; and (5) Participate and lead efforts in the DOE Working Groups.« less

  18. Simulated linear test applied to quantitative proteomics.

    PubMed

    Pham, T V; Jimenez, C R

    2016-09-01

    Omics studies aim to find significant changes due to biological or functional perturbation. However, gene and protein expression profiling experiments contain inherent technical variation. In discovery proteomics studies where the number of samples is typically small, technical variation plays an important role because it contributes considerably to the observed variation. Previous methods place both technical and biological variations in tightly integrated mathematical models that are difficult to adapt for different technological platforms. Our aim is to derive a statistical framework that allows the inclusion of a wide range of technical variability. We introduce a new method called the simulated linear test, or the s-test, that is easy to implement and easy to adapt for different models of technical variation. It generates virtual data points from the observed values according to a pre-defined technical distribution and subsequently employs linear modeling for significance analysis. We demonstrate the flexibility of the proposed approach by deriving a new significance test for quantitative discovery proteomics for which missing values have been a major issue for traditional methods such as the t-test. We evaluate the result on two label-free (phospho) proteomics datasets based on ion-intensity quantitation. Available at http://www.oncoproteomics.nl/software/stest.html : t.pham@vumc.nl. © The Author 2016. Published by Oxford University Press. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com.

  19. State of the Art Report on Statewide Student Competency Testing in Vocational and Technical Education, 1993-94.

    ERIC Educational Resources Information Center

    Love-Wilkes, Rebecca; Cummings, Ronda

    This report on competency testing in vocational and technical education is a follow-up to previous reports published in 1988 and 1990. Section 1 summarizes the data. It describes competency testing in the 13 states that currently mandate competency testing and identifies the 11 states in which voluntary testing is occurring, the 9 states either…

  20. 77 FR 58301 - Technical Amendment; Airworthiness Standards: Aircraft Engines; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... technical amendment, the FAA clarified aircraft engine vibration test requirements in the airworthiness... amendment, the FAA intended to clarify vibration test requirements in Sec. 33.83 of 14 Code of Federal... read as follows: Sec. 33.83 Vibration test. (a) Each engine must undergo vibration surveys to establish...

  1. Technical Highlight: NREL Improves Building Energy Simulation Programs Through Diagnostic Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Polly, B.

    2012-01-09

    This technical highlight describes NREL research to develop Building Energy Simulation Test for Existing Homes (BESTEST-EX) to increase the quality and accuracy of energy analysis tools for the building retrofit market.

  2. [NASA/DOD Aerospace Knowledge Diffusion Research Project. Report 2:] Technical communications in aeronautics: Results of an exploratory study. An analysis of managers' and nonmanagers' responses

    NASA Technical Reports Server (NTRS)

    Pinelli, Thomas E.; Glassman, Myron; Barclay, Rebecca O.; Oliu, Walter E.

    1989-01-01

    Data collected from an exploratory study concerned with the technical communications practices of aerospace engineers and scientists were analyzed to test the primary assumption that aerospace managers and nonmanagers have different technical communications practices. Five assumptions were established for the analysis. Aerospace managers and nonmanagers were found to have different technical communications practices for three of the five assumptions tested. Although aerospace managers and nonmanagers were found to have different technical communications practices, the evidence was neither conclusive nor compelling that the presumption of difference in practices could be attributed to the duties performed by aerospace managers and nonmanagers.

  3. UTM Technical Capabilities Level 2 (TLC2) Test at Reno-Stead Airport.

    NASA Image and Video Library

    2016-10-06

    Test of Unmanned Aircraft Systems Traffic Management (UTM) technical capability Level 2 (TCL2) at Reno-Stead Airport, Nevada. During the test, five drones simultaneously crossed paths, separated by altitude. Two drones flew beyond visual line-of-sight and three flew within line-of-sight of their operators. Precision Hawk pilot readies Lancaster Mark 3 UAS for test flight.

  4. FRATIS concept of operations : assess test readiness of FRATIS (task 4).

    DOT National Transportation Integrated Search

    2012-08-01

    This technical memorandum presents a concise assessment of the key technical and nontechnical issues and limitations related to field-testing the Freight Advanced Traveler Information System (FRATIS) Dynamic Mobility Applications (DMA) bundle and its...

  5. A Theory of Sex Differences in Technical Aptitude and Some Supporting Evidence.

    PubMed

    Schmidt, Frank L

    2011-11-01

    In this article, I present a theory that explains the origin of sex differences in technical aptitudes. The theory takes as proven that there are no sex differences in general mental ability (GMA), and it postulates that sex differences in technical aptitude (TA) stem from differences in experience in technical areas, which is in turn based on sex differences in technical interests. Using a large data set, I tested and found support for four predictions made by this theory: (a) the construct level correlation between technical aptitude and GMA is larger for females than males, (b) the observed and true score variability of technical aptitude is greater among males than females, (c) at every level of GMA females have lower levels of technical aptitude, and (d) technical aptitude measures used as estimates of GMA for decision purposes would result in underestimation of GMA levels for girls and women. Given that GMA carries the weight of prediction of job performance, the support found for this last prediction suggests that, for many jobs, technical aptitude tests may underpredict the job performance of female applicants and employees. Future research should examine this question. © Association for Psychological Science 2011.

  6. 42 CFR 493.1838 - Training and technical assistance for unsuccessful participation in proficiency testing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Training and technical assistance for unsuccessful... REQUIREMENTS Enforcement Procedures § 493.1838 Training and technical assistance for unsuccessful participation... may require the laboratory to undertake training of its personnel, or to obtain necessary technical...

  7. MHD program plan, FY 1991

    NASA Astrophysics Data System (ADS)

    1990-10-01

    The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.

  8. UTM Technical Capabilities Level 2 (TLC2) Test at Reno-Stead Airport.

    NASA Image and Video Library

    2016-10-06

    Test of Unmanned Aircraft Systems Traffic Management (UTM) technical capability Level 2 (TCL2) at Reno-Stead Airport, Nevada. During the test, five drones simultaneously crossed paths, separated by altitude. Two drones flew beyond visual line-of-sight and three flew within line-of-sight of their operators.

  9. 'Buildings in Use' Study. Technical Factors.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Milwaukee. School of Architecture and Urban Planning.

    The second report of the 'Buildings in Use' study documents the results of over 100 field tests conducted at four elementary schools, as well as discussion of these results and relevant technical specifications and details. The procedural framework used in the Field Tests Manual is followed and test results are rated numerically wherever possible.…

  10. 77 FR 1129 - Revisions to Test Methods and Testing Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-09

    ...This action proposes editorial and technical corrections necessary for source testing of emissions and operations. The revisions include the addition of alternative equipment and methods as well as corrections to technical and typographical errors. We also solicit public comment on potential changes to the current procedures for determining emission stratification.

  11. Use of "t"-Test and ANOVA in Career-Technical Education Research

    ERIC Educational Resources Information Center

    Rojewski, Jay W.; Lee, In Heok; Gemici, Sinan

    2012-01-01

    Use of t-tests and analysis of variance (ANOVA) procedures in published research from three scholarly journals in career and technical education (CTE) during a recent 5-year period was examined. Information on post hoc analyses, reporting of effect size, alpha adjustments to account for multiple tests, power, and examination of assumptions…

  12. Diagnostic Testing Package DX v 2.0 Technical Specification. Methodology Project.

    ERIC Educational Resources Information Center

    McArthur, David

    This paper contains the technical specifications, schematic diagrams, and program printout for a computer software package for the development and administration of diagnostic tests. The second version of the Diagnostic Testing Package DX consists of a PASCAL-based set of modules located in two main programs: (1) EDITTEST creates, modifies, and…

  13. AHMCT Intelligent Roadway Information System (IRIS) technical support and testing

    DOT National Transportation Integrated Search

    2011-12-31

    This report documents the research project AHMCT IRIS Technical Support and Testing, : performed under contract 65A0275, Task ID 1777. It presents an overview of the Intelligent : Roadway Information System (IRIS), and its design and function. ...

  14. AHMCT Intelligent Roadway Information System (IRIS) technical support and testing.

    DOT National Transportation Integrated Search

    2011-12-01

    This report documents the research project AHMCT IRIS Technical Support and Testing, : performed under contract 65A0275, Task ID 1777. It presents an overview of the Intelligent : Roadway Information System (IRIS), and its design and function. ...

  15. Automated water monitor system field demonstration test report. Volume 2: Technical summary

    NASA Technical Reports Server (NTRS)

    Brooks, R. L.; Jeffers, E. L.; Perreira, J.; Poel, J. D.; Nibley, D.; Nuss, R. H.

    1981-01-01

    The NASA Automatic Water Monitor System was installed in a water reclamation facility to evaluate the technical and cost feasibility of producing high quality reclaimed water. Data gathered during this field demonstration test are reported.

  16. Refinement of Reading and Mathematics Test Through an Analysis of Reactivity. Beginning Teacher Evaluation Study. Technical Report Series. Technical Report III-6.

    ERIC Educational Resources Information Center

    Filby, Nikola N.; Dishaw, Marilyn

    Major analyses of the achievement tests used in the Beginning Teacher Evaluation Study were conducted to determine test reactivity to instruction. Reading and mathematics tests were administered to second and fifth grade children. Classroom teachers' records were examined to determine the amount of opportunity students had to learn the content…

  17. Aiming for excellence - A simulation-based study on adapting and testing an instrument for developing non-technical skills in Norwegian student nurse anaesthetists.

    PubMed

    Flynn, Fiona M; Sandaker, Kjersti; Ballangrud, Randi

    2017-01-01

    There is increasing focus on building safety into anaesthesia practice, with excellence in anaesthesia as an aspirational goal. Non-technical skills are an important factor in excellence and improved patient safety, though there have been few systematic attempts at integrating them into anaesthesia nursing education. This study aimed to test the reliability of NANTS-no, a specially adapted behavioural marker system for nurse anaesthetists in Norway, and explore the development of non-technical skills in student nurse anaesthetists. The pre-test post-test design incorporated a 10-week simulation-based programme, where non-technical skills in 14 student nurse anaesthetists were rated on three different occasions during high-fidelity simulation, before and after taking part in a training course. NANTS-no demonstrated high overall inter-rater reliability (ICC = 0.91), high test-retest reliability (ICC = 0.94) and good internal consistency (Cronbach's α of 0.85-0.92). A significant improvement was demonstrated across all categories of non-technical skills, with greatest improvements between the first and third and second and third sessions. There was also a significant improvement in two categories between the first and second sessions. NANTS-no is therefore suitable for assessing non-technical skills during simulation training in anaesthesia nursing education. More research is needed to validate its use in clinical practice. Copyright © 2016 Elsevier Ltd. All rights reserved.

  18. Field Test of the Methodology for Succession Planning for Technical Experts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cain, Ronald A.; Kirk, Bernadette Lugue; Agreda, Carla L.

    This report complements A Methodology for Succession Planning for Technical Experts (Ron Cain, Shaheen Dewji, Carla Agreda, Bernadette Kirk, July 2017), which describes a methodology for identifying and evaluating the loss of key technical skills at nuclear operations facilities. This report targets the methodology for identifying critical skills, hereafter referred to as “core competencies”. The methodology has been field tested by interviewing selected retiring subject matter experts (SMEs).

  19. Training Manuals and Technical Publications.

    ERIC Educational Resources Information Center

    Army Test and Evaluation Command, Aberdeen Proving Ground, MD.

    The objective of the Materiel Test Procedure is to describe methods for determining the need for adequacy of comprehensiveness, and clarity of training manuals and technical publications (or other pertinent types of literature) relating to the ammunition or ammunition components being tested. (Author)

  20. Trends in liability affecting technical writers

    NASA Technical Reports Server (NTRS)

    Driskill, L. P.

    1981-01-01

    Liability of technical writers for defective products is explored. Documents generated during a product's life cycle (including design memos, design tests, clinical trials, trial use reports, letters, and proposals) become relevant because they are likely to become the only available means of showing that the product was not defectively designed. These documents become the evidence that the product underwent balanced and well considered planning, development, testing, quality control, and field testing. The predicted increased involvement of technical writers in the prevention and defense of product liability claims is cited in view of a greater number of cases turning on "failure to warn".

  1. Dr. Wernher von Braun

    NASA Technical Reports Server (NTRS)

    2004-01-01

    Dr. von Braun is looking out from a 10th floor window of building 4200 at the Marshall Space Flight Center (MSFC). He was the first Center Director and served as the Director from July 1960 through February 1970. Following World War II, Dr. von Braun and his German colleagues arrived in the United States under the Project Paperclip (American acquisition of German rocket experts) to continue their rocket development work. In 1950, von Braun and his German Rocket Team (also called the Peenemuende Team) were transferred from Ft. Bliss, Texas to Huntsville, Alabama to work for the Army's rocket program at Redstone Arsenal and later, NASA's Marshall Space Flight Center (MSFC). Under Dr. von Braun's leadership, MSFC developed the Saturn V launch vehicle, which placed the first men, two American astronauts, on the Moon. Wernher von Braun's life was dedicated to expanding man's knowledge through the exploration of space.

  2. KSC-2011-3323

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- Lieutenant General Susan J. Helms, commander of the 14th Air Force and former astronaut, addresses the audience at a celebration at Complex 5/6 on Cape Canaveral Air Force Station in Florida. The celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  3. KSC-2011-3315

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- Kennedy Space Center Director and former astronaut Bob Cabana addresses the audience at a celebration at Complex 5/6 on Cape Canaveral Air Force Station in Florida. The celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  4. KSC-2011-3331

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- During a celebration at Complex 5/6 on Cape Canaveral Air Force Station in Florida, Mercury astronaut Scott Carpenter greets Calvin Fowler, the launch conductor for Carpenter's Mercury-Atlas 7 mission on May 24, 1962. The celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  5. KSC-2011-3324

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- Kennedy Space Center Director and former astronaut Bob Cabana addresses the audience at a celebration at Complex 5/6 on Cape Canaveral Air Force Station in Florida. The celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  6. KSC-2011-3327

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- Invited guests enjoy a tribute to astronaut Alan Shepard during a celebration at Complex 5/6 on Cape Canaveral Air Force Station in Florida. The celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  7. KSC-2011-3325

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- NBC reporter Jay Barbree introduces Alice Wackermann, Julie Jenkins and Laura Churchley, daughters of astronaut Alan Shepard, to the audience at a celebration at Complex 5/6 on Cape Canaveral Air Force Station in Florida. The celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  8. KSC-2011-3318

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- From left, NBC reporter Jay Barbree and Alice Wackermann, Julie Jenkins (at microphone) and Laura Churchley, daughters of astronaut Alan Shepard, participate in a celebration at Complex 5/6 on Cape Canaveral Air Force Station in Florida. The celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  9. KSC-2011-3319

    NASA Image and Video Library

    2011-05-05

    CAPE CANAVERAL, Fla. -- From left, Mercury astronaut Scott Carpenter and Alice Wackermann and Julie Jenkins, daughters of astronaut Alan Shepard, enjoy a tribute to Shepard during a celebration at Complex 5/6 on Cape Canaveral Air Force Station in Florida. The celebration was held at the launch site of the first U.S. manned spaceflight May 5, 1961, to mark the 50th anniversary of the flight. Fifty years ago, astronaut Alan Shepard lifted off inside the Mercury capsule, "Freedom 7," atop an 82-foot-tall Mercury-Redstone rocket at 9:34 a.m. EST, sending him on a remarkably successful, 15-minute suborbital flight. The event was attended by more than 200 workers from the original Mercury program and included a re-creation of Shepard's flight and recovery, as well as a tribute to his contributions as a moonwalker on the Apollo 14 lunar mission. For more information, visit www.nasa.gov/topics/history/milestones/index.html. Photo credit: NASA/Kim Shiflett

  10. New Mexico Standards Based Assessment (NMSBA) Technical Report: 2006 Spring Administration

    ERIC Educational Resources Information Center

    Griph, Gerald W.

    2006-01-01

    The purpose of the NMSBA technical report is to provide users and other interested parties with a general overview of and technical characteristics of the 2006 NMSBA. The 2006 technical report contains the following information: (1) Test development; (2) Scoring procedures; (3) Calibration, scaling, and equating procedures; (4) Standard setting;…

  11. Wireless Instrumentation Systems for Flight Testing at NASA AFRC

    NASA Technical Reports Server (NTRS)

    Hang, Richard

    2017-01-01

    NASA Armstrong Flight Research Center is revolutionizing its traditional wired instrumentation systems with wireless technologies. This effort faces many technical challenges, such as spectrum compliance, time synchronization, power distribution and airworthiness. This presentation summarizes NASA AFRC's flight test capabilities with current conventional instrumentation methodology and highlights the technical challenges of wireless systems used for flight test research applications.

  12. The Uses and Misuses of Test Scores: Technical Assistance Perspective.

    ERIC Educational Resources Information Center

    Echternacht, Gary

    The uses and misuses of standardized test results used for program evaluation as seen by a staff member of an Elementary Secondary Education Act (ESEA) Title I Technical Assistance Center are described. In ESEA Title I, test scores are used to select students for the program. Although federal requirements do not require using standardized test…

  13. Evaluation of Impinging Stream Vortex Chamber Concepts for Liquid Rocket Engine Applications

    NASA Technical Reports Server (NTRS)

    Trinh, Huu P.; Bullard, Brad; Kopicz, Charles; Michaels, Scott; Turner, James (Technical Monitor)

    2001-01-01

    To pursue technology developments for future launch vehicles, NASA/Marshall Space Flight Center (MSFC) is examining vortex chamber concepts for liquid rocket engine applications. Past studies indicated that the vortex chamber schemes potentially have a number of advantages over conventional chamber methods. Due to the nature of the vortex flow, relatively cooler propellant streams tend to flow along the chamber wall. Hence, the thruster chamber can be operated without the need of any cooling techniques. This vortex flow also creates strong turbulence, which promotes the propellant mixing process. Consequently, the subject chamber concepts not only offer the system simplicity, but they also would enhance the combustion performance. The test results showed that the chamber performance was markedly high even at a low chamber length-to-diameter ratio (L/D). This incentive can be translated to a convenience in the thrust chamber packaging. Variations of the vortex chamber concepts have been introduced in the past few decades. These investigations include an ongoing work at Orbital Technologies Corporation (ORBITEC). By injecting the oxidizer tangentially at the chamber convergence and fuel axially at the chamber head end, Knuth et al. were able to keep the wall relatively cold. A recent investigation of the low L/D vortex chamber concept for gel propellants was conducted by Michaels. He used both triplet (two oxidizer and one fuel orifices) and unlike impinging schemes to inject propellants tangentially along the chamber wall. Michaels called the subject injection scheme as Impinging Stream Vortex Chamber (ISVC). His preliminary tests showed that high performance, with an Isp efficiency of 92%, can be obtained. MSFC and the U.S. Army are jointly investigating an application of the ISVC concept for the cryogenic oxygen/hydrocarbon propellant system. This vortex chamber concept is currently tested with gel propellants at AMCOM at Redstone Arsenal, Alabama. A version of this concept for the liquid oxygen (LOX)/hydrocarbon fuel (RPM) system has been derived from the one for the gel propellant.

  14. Integrated corridor management initiative : demonstration phase evaluation – Dallas technical capability analysis test plan.

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM ...

  15. easyCBM CCSS Math Item Scaling and Test Form Revision (2012-2013): Grades 6-8. Technical Report #1313

    ERIC Educational Resources Information Center

    Anderson, Daniel; Alonzo, Julie; Tindal, Gerald

    2012-01-01

    The purpose of this technical report is to document the piloting and scaling of new easyCBM mathematics test items aligned with the Common Core State Standards (CCSS) and to describe the process used to revise and supplement the 2012 research version easyCBM CCSS math tests in Grades 6-8. For all operational 2012 research version test forms (10…

  16. Around Marshall

    NASA Image and Video Library

    1963-01-14

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the S-IC test stand, related facilities were constructed during this time frame. Built just north of the massive S-IC test stand was the F-1 Engine test stand. The F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base, and was designed to assist in the development of the F-1 Engine. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo, taken January 14, 1963 depicts the F-1 test stand site with hoses pumping excess water from the site.

  17. Construction Progress of the S-IC Test Stand Complex Bunker House

    NASA Technical Reports Server (NTRS)

    1963-01-01

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army's Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the S-IC stand, additional related facilities were built during this time frame. Built to the east of the S-IC stand, the block house served as the control room. To the south of the blockhouse was a newly constructed pump house used for delivering water to the S-IC stand during testing. North of the massive test stand, the F-1 Engine test stand was built for testing a single F-1 engine. Just southeast of the S-IC stand a concrete bunker house was constructed. The bunker housed an emergency crew clad in fire proof gear, who were close at hand should any emergencies arise during testing. This photo of the completed bunker house was taken on May 7, 1963.

  18. A model of cardiopulmonary bypass staged training integrating technical and non-technical skills dedicated to cardiac trainees.

    PubMed

    Fouilloux, V; Doguet, F; Kotsakis, A; Dubrowski, A; Berdah, S

    2015-03-01

    To develop a standardized simulation-based curriculum to teach medical knowledge and technical, communication and critical thinking skills necessary to initiate and wean from cardiopulmonary bypass (CPB) to junior cardiac trainees (CTs) in France. Performance on post-curricular tests was compared between CTs who participated in the new curriculum to those who did not. The simulation-based curriculum was developed by content and education experts. Simulations sequentially taught the skills necessary for initiating and weaning from CPB as well as managing crises by adding fidelity and complexity to scenarios. Nine CTs were randomly assigned to the new curriculum (n=5) or the traditional curriculum (n=4). Skills were assessed using tests of medical knowledge and technical, communication (GRS) and critical thinking (SCT) skills. A two-sample Wilcoxon rank-sum test compared average scores between the two groups. Alpha of 0.05 was set to indicate statistically significant differences. The resutls revealed that CTs in the new curriculum significantly outperformed CTs in the traditional curriculum on technical (18.2 vs 14.8, p=0.05) and communication (3.5 vs 2.2, p=0.013) skills. There was no significant difference between CTs in the new curriculum in the Script Concordance Test (16.5 vs 14.8, p=0.141) and knowledge tests (26.9 vs 24.6, p=0.14) compared to CTs in the traditional curriculum. Our new curriculum teaches communication and technical skills necessary for CPB. The results of this pilot study are encouraging and relevant. They give grounds for future research with a larger panel of trainees. Based on the current distribution of scores, a sample size of 12 CTs per group should yield significant results for all tests. © The Author(s) 2014.

  19. Technical Communications in Aeronautics: Results of an Exploratory Study. An Analysis of Managers' and Nonmanagers' Responses. NASA Technical Memorandum 101625.

    ERIC Educational Resources Information Center

    Pinelli, Thomas E.; And Others

    Data collected from an exploratory study concerned with the technical communications practices of aerospace engineers and scientists were analyzed to test the primary assumption that aerospace managers and nonmanagers have different technical communications practices. Five secondary assumptions were established for the analysis: (1) that the…

  20. 42 CFR 493.1409 - Condition: Laboratories performing moderate complexity testing; technical consultant.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Condition: Laboratories performing moderate complexity testing; technical consultant. 493.1409 Section 493.1409 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION...

  1. 42 CFR 493.1409 - Condition: Laboratories performing moderate complexity testing; technical consultant.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Condition: Laboratories performing moderate complexity testing; technical consultant. 493.1409 Section 493.1409 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION...

  2. Applied Reading Test--Forms A and B, Interim Manual, and Answer Sheets.

    ERIC Educational Resources Information Center

    Australian Council for Educational Research, Hawthorn.

    Designed for use in the selection of apprentices, trainees, technical and trade personnel, and any other persons who need to read and understand text of a technical nature, this Applied Reading Test specimen set contains six passages and 32 items, has a 30-minute time limit, and is presented in a reusable multiple choice test booklet. The specimen…

  3. Around Marshall

    NASA Image and Video Library

    1963-08-13

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. North of the massive S-IC test stand, the F-1 Engine test stand was built. Designed to assist in the development of the F-1 Engine, the F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo depicts the construction of the F-1 test stand as of August 13, 1963. All four of its tower legs are well underway into the skyline.

  4. Mercury Capsule Construction at the NASA Lewis Research Center

    NASA Image and Video Library

    1959-08-21

    A NASA mechanic secures the afterbody to a Mercury capsule in the hangar at the Lewis Research Center. The capsule was one of two built at Lewis for the “Big Joe” launches scheduled for September 1959. The initial phase of Project Mercury consisted of a series of unmanned launches using the Air Force’s Redstone and Atlas boosters and the Langley-designed Little Joe boosters. The first Atlas launch, referred to as “Big Joe”, was a single attempt early in Project Mercury to use a full-scale Atlas booster to simulate the reentry of a mock-up Mercury capsule without actually placing it in orbit. The overall design of Big Joe had been completed by December 1958, and soon thereafter project manager Aleck Bond assigned NASA Lewis the task of designing the electronic instrumentation and automatic stabilization system. Lewis also constructed the capsule’s lower section, which contained a pressurized area with the electronics and two nitrogen tanks for the retrorockets. Lewis technicians were responsible for assembling the entire capsule: the General Electric heatshield, NASA Langley afterbody and recovery canister, and Lewis electronics and control systems. On June 9, 1959, the capsule was loaded on an air force transport aircraft and flown to Cape Canaveral. A team of 45 test operations personnel from Lewis followed the capsule to Florida and spent the ensuing months preparing it for launch. The launch took place in the early morning hours of September 9, 1959.

  5. Open Field Test; Technical Report 14. Disadvantaged Children and Their First School Experiences. ETS-Head Start Longitudinal Study. Technical Report Series.

    ERIC Educational Resources Information Center

    Ward, William C.

    The Open Field Test was used to assess variables that might not be manifested in a more standard testing situation. In this test, the child was shown 10 standard play objects in the room, and was told to do anything he wished with the toys. The tester initiated no interaction with the child and responded minimally to any overture made by the…

  6. An assessment of individualized technical ear training for audio production.

    PubMed

    Kim, Sungyoung

    2015-07-01

    An individualized technical ear training method is compared to a non-individualized method. The efficacy of the individualized method is assessed using a standardized test conducted before and after the training period. Participants who received individualized training improved better than the control group on the test. Results indicate the importance of individualized training for acquisition of spectrum-identification and spectrum-matching skills. Individualized training, therefore, should be implemented by default into technical ear training programs used in audio production industry and education.

  7. NASA Handbook for Spacecraft Structural Dynamics Testing

    NASA Technical Reports Server (NTRS)

    Kern, Dennis L.; Scharton, Terry D.

    2005-01-01

    Recent advances in the area of structural dynamics and vibrations, in both methodology and capability, have the potential to make spacecraft system testing more effective from technical, cost, schedule, and hardware safety points of view. However, application of these advanced test methods varies widely among the NASA Centers and their contractors. Identification and refinement of the best of these test methodologies and implementation approaches has been an objective of efforts by the Jet Propulsion Laboratory on behalf of the NASA Office of the Chief Engineer. But to develop the most appropriate overall test program for a flight project from the selection of advanced methodologies, as well as conventional test methods, spacecraft project managers and their technical staffs will need overall guidance and technical rationale. Thus, the Chief Engineer's Office has recently tasked JPL to prepare a NASA Handbook for Spacecraft Structural Dynamics Testing. An outline of the proposed handbook, with a synopsis of each section, has been developed and is presented herein. Comments on the proposed handbook are solicited from the spacecraft structural dynamics testing community.

  8. NASA Handbook for Spacecraft Structural Dynamics Testing

    NASA Technical Reports Server (NTRS)

    Kern, Dennis L.; Scharton, Terry D.

    2004-01-01

    Recent advances in the area of structural dynamics and vibrations, in both methodology and capability, have the potential to make spacecraft system testing more effective from technical, cost, schedule, and hardware safety points of view. However, application of these advanced test methods varies widely among the NASA Centers and their contractors. Identification and refinement of the best of these test methodologies and implementation approaches has been an objective of efforts by the Jet Propulsion Laboratory on behalf of the NASA Office of the Chief Engineer. But to develop the most appropriate overall test program for a flight project from the selection of advanced methodologies, as well as conventional test methods, spacecraft project managers and their technical staffs will need overall guidance and technical rationale. Thus, the Chief Engineer's Office has recently tasked JPL to prepare a NASA Handbook for Spacecraft Structural Dynamics Testing. An outline of the proposed handbook, with a synopsis of each section, has been developed and is presented herein. Comments on the proposed handbook is solicited from the spacecraft structural dynamics testing community.

  9. 42 CFR 493.1447 - Condition: Laboratories performing high complexity testing; technical supervisor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Condition: Laboratories performing high complexity testing; technical supervisor. 493.1447 Section 493.1447 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION LABORATORY...

  10. 42 CFR 493.1447 - Condition: Laboratories performing high complexity testing; technical supervisor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Condition: Laboratories performing high complexity testing; technical supervisor. 493.1447 Section 493.1447 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION LABORATORY...

  11. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  12. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  13. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  14. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  15. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  16. NASA Public Affairs and NUANCE Lab News Conference at Reno-Stead Airport.

    NASA Image and Video Library

    2016-10-19

    News Conference following the test of Unmanned Aircraft Systems Traffic Management (UTM) technical capability Level 2 (TCL2) at Reno-Stead Airport, Nevada. Joseph Rios, NASA Ames Aerospace Engineer and UTM Technical Lead, describes the purpose of the test and flight scenarios.

  17. Technical Communications in Aeronautics: Results of an Exploratory Study. An Analysis of Profit Managers' and Nonprofit Managers' Responses. NASA Technical Memorandum 101626.

    ERIC Educational Resources Information Center

    Pinelli, Thomas E.; And Others

    Data collected from an exploratory study concerned with the technical communications practices of aerospace engineers and scientists were analyzed to test the primary assumption that profit and nonprofit managers in the aerospace community have different technical communications practices. Profit and nonprofit managers were compared in five…

  18. Employment of telemedicine in emergency medicine. Clinical requirement analysis, system development and first test results.

    PubMed

    Czaplik, M; Bergrath, S; Rossaint, R; Thelen, S; Brodziak, T; Valentin, B; Hirsch, F; Beckers, S K; Brokmann, J C

    2014-01-01

    Demographic change, rising co-morbidity and an increasing number of emergencies are the main challenges that emergency medical services (EMS) in several countries worldwide are facing. In order to improve quality in EMS, highly trained personnel and well-equipped ambulances are essential. However several studies have shown a deficiency in qualified EMS physicians. Telemedicine emerges as a complementary system in EMS that may provide expertise and improve quality of medical treatment on the scene. Hence our aim is to develop and test a specific teleconsultation system. During the development process several use cases were defined and technically specified by medical experts and engineers in the areas of: system administration, start-up of EMS assistance systems, audio communication, data transfer, routine tele-EMS physician activities and research capabilities. Upon completion, technical field tests were performed under realistic conditions to test system properties such as robustness, feasibility and usability, providing end-to-end measurements. Six ambulances were equipped with telemedical facilities based on the results of the requirement analysis and 55 scenarios were tested under realistic conditions in one month. The results indicate that the developed system performed well in terms of usability and robustness. The major challenges were, as expected, mobile communication and data network availability. Third generation networks were only available in 76.4% of the cases. Although 3G (third generation), such as Universal Mobile Telecommunications System (UMTS), provides beneficial conditions for higher bandwidth, system performance for most features was also acceptable under adequate 2G (second generation) test conditions. An innovative concept for the use of telemedicine for medical consultations in EMS was developed. Organisational and technical aspects were considered and practical requirements specified. Since technical feasibility was demonstrated in these technical field tests, the next step would be to prove medical usefulness and technical robustness under real conditions in a clinical trial.

  19. NATO Guidelines on Human Engineering Testing and Evaluation

    DTIC Science & Technology

    2001-05-01

    1980s and is known as Manpower, Personnel, and Training Integration (MANPRINT). The objective of this comprehensive management and technical effort is...systems under benign test conditions, using test subjects who are considerably more knowledeable of the system than the eventual users of the system will...Technical Management , Aeronautical Systems Division, Air Force Systems Command. Itoh, Y., Hayashi, Y., Tsukui, L, and Saito, S. (1989). Heart rate

  20. 76 FR 4549 - Testing of Certain High Production Volume Chemicals; Second Group of Chemicals; Technical Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... Testing of Certain High Production Volume Chemicals; Second Group of Chemicals; Technical Correction... production volume (HPV) chemical substances to obtain screening level data for health and environmental effects and chemical fate. This document is being issued to correct a typographical error concerning the...

  1. Project DIVIDE Instrument Development. Technical Report # 0810

    ERIC Educational Resources Information Center

    Ketterlin-Geller, Leanne; Jung, Eunju; Geller, Josh; Yovanoff, Paul

    2008-01-01

    In this technical report, we describe the development of cognitive diagnostic test items that form the basis of the diagnostic system for Project DIVIDE (Dynamic Instruction Via Individually Designed Environments). The construct underlying the diagnostic test is division of fractions. We include a description of the process we used to identify the…

  2. 14 CFR 147.31 - Attendance and enrollment, tests, and credit for prior instruction or experience.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... accredited vocational, technical, trade or high school; (iii) A military technical school; (iv) A... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES AVIATION MAINTENANCE TECHNICIAN SCHOOLS Operating Rules § 147.31 Attendance and enrollment, tests, and credit for prior...

  3. Healthy Water Healthy People Field Monitoring Guide

    ERIC Educational Resources Information Center

    Project WET Foundation, 2003

    2003-01-01

    This 100-page manual serves as a technical reference for the "Healthy Water, Healthy People Water Quality Educators Guide" and the "Healthy Water Healthy People Testing Kits". Yielding in-depth information about ten water quality parameters, it answers questions about water quality testing using technical overviews, data interpretation guidelines,…

  4. Problems Relating to Examinations in Three-Year Technical/Natural Science Courses of Study at the Federal Armed Forces University, Munich.

    ERIC Educational Resources Information Center

    Ulbricht, Kurt; Zimmermann, Peter

    1981-01-01

    Problems encountered in testing in aerospace engineering courses in an accelerated technical program of a German military university are outlined. Four common grading procedures are compared, and the optimum length of written tests is discussed. (MSE)

  5. 48 CFR 942.270-1 - Contracting Officer's Representatives.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performing certain technical functions in administering a contract. These functions include, but are not limited to, technical monitoring, inspection, approval of shop drawings, testing, and approval of samples. The COR acts solely as a technical representative of the contracting officer and is not authorized to...

  6. 30 CFR 7.404 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Technical requirements. 7.404 Section 7.404 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND... Cable Splice Kits § 7.404 Technical requirements. (a) Electric cables and splices shall be flame...

  7. 10 CFR 52.158 - Contents of application; additional technical information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Contents of application; additional technical information... APPROVALS FOR NUCLEAR POWER PLANTS Manufacturing Licenses § 52.158 Contents of application; additional technical information. The application must contain: (a)(1) Inspections, tests, analyses, and acceptance...

  8. 10 CFR 52.80 - Contents of applications; additional technical information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Contents of applications; additional technical information... APPROVALS FOR NUCLEAR POWER PLANTS Combined Licenses § 52.80 Contents of applications; additional technical information. The application must contain: (a) The proposed inspections, tests, and analyses, including those...

  9. Sequin Form Board; Technical Report 20. Disadvantaged Children and Their First School Experiences. ETS-Head Start Longitudinal Study. Technical Report Series.

    ERIC Educational Resources Information Center

    Lindstrom, David R.; Shipman, Virginia C.

    The Seguin Form Board Test is used to assess visual discrimination and matching and eye-hand coordination. Previous analysis has shown the vactor loadings for the same scale to differ among age levels, so the test may be measuring different abilities at different age levels. Test materials consist of ten differently shaped wooden blocks and a…

  10. Simultaneous Estimation of Regression Functions for Marine Corps Technical Training Specialties.

    DTIC Science & Technology

    1985-01-03

    Edmonton, Alberta CANADA 1 Dr. Frederic M. Lord Educational Testing Service 1 Dr. Earl Hunt Princeton, NJ 08541 Dept, of Psychology University of...111111-1.6 MICROCOPY RESOLUTION TEST CHART NATIONAL BUREAU OF STANDARDS-1963-A SIMIULTANEOUS ESTIMATION OF REGRESSION FUNCTIONS FOR MARINE CORPS...Bayesian techniques for simul- taneous estimation to the specification of regression weights for selection tests used in various technical training courses

  11. Technical Support and Documentation Management for 25 Ton All Terrain Crane (ATEC).

    DTIC Science & Technology

    1991-03-11

    Rationale Report * Market Investigation and Supplement " Technical Feasibility Test Having considered material contained in the above documents and...Operational issues will be evaluated by OTEC as observers to the qualification testing . A logistics demonstration will be conducted in parallel with PPQT...Organizational OSHA Occupational Safety and Health Administration D-1 APPENDIX D - LIST OF ACRONYMNS (Continued) OTEC Operational Test and Evaluation Command OTP

  12. Development and Refinement of Reading and Mathematics Tests for Grades 2 and 5. Beginning Teacher Evaluation Study. Technical Report Series. Technical Report III-1. Continuation of Phase III A.

    ERIC Educational Resources Information Center

    Filby, Nikola N.; Dishaw, Marilyn

    Achievement tests that are maximally sensitive to effective instruction in reading and mathematics for grades 2 and 5 were developed and refined. Important considerations regarding the tests' validity were: its coverage of instructional content (opportunity to learn), and its reactivity to instruction. Student ability must be minimally related to…

  13. UTM Technical Capabilities Level 2 (TLC2) Test at Reno-Stead Airport.

    NASA Image and Video Library

    2016-10-06

    Test of Unmanned Aircraft Systems Traffic Management (UTM) technical capability Level 2 (TCL2) at Reno-Stead Airport, Nevada. During the test, five drones simultaneously crossed paths, separated by altitude. Two drones flew beyond visual line-of-sight and three flew within line-of-sight of their operators. Precision Hawk pilot launches UAS Lancaster Mark 3, one of 11 vehicles in the UTM TCL2 demonstration that will fly beyond line of sight of the pilot in command in Nevada test.

  14. UTM Technical Capabilities Level 2 (TLC2) Test at Reno-Stead Airport.

    NASA Image and Video Library

    2016-10-06

    Test of Unmanned Aircraft Systems Traffic Management (UTM) technical capability Level 2 (TCL2) at Reno-Stead Airport, Nevada. During the test, five drones simultaneously crossed paths, separated by altitude. Two drones flew beyond visual line-of-sight and three flew within line-of-sight of their operators. Engineers Priya Venkatesan and Joey Mercer review flight paths using the UAS traffic management research platform at flight operations mission control at NASA’s UTM TCL2 test.

  15. Basic Skills Assessment Program. Technical Report.

    ERIC Educational Resources Information Center

    Los Angeles County Superintendent of Schools, CA.

    This is the second technical report on the Basic Skills Assessment Program for the Department of Defense Dependents Schools (DoDDS). The report includes a summary of 1979-80 testing activities organized into five chapters. The first chapter provides an overview of report contents and a brief history of the testing program. The second chapter…

  16. ACT Plan: Technical Manual. 2013/2014

    ERIC Educational Resources Information Center

    ACT, Inc., 2013

    2013-01-01

    This manual contains information about the American College Test (ACT) Plan® program. The principal focus of this manual is to document the Plan program's technical adequacy in light of its intended purposes. This manual supersedes the 2011 edition. The content of this manual responds to requirements of the testing industry as established in the…

  17. Wave basin model tests of technical-biological bank protection

    NASA Astrophysics Data System (ADS)

    Eisenmann, J.

    2012-04-01

    Sloped embankments of inland waterways are usually protected from erosion and other negative im-pacts of ship-induced hydraulic loads by technical revetments consisting of riprap. Concerning the dimensioning of such bank protection there are several design rules available, e.g. the "Principles for the Design of Bank and Bottom Protection for Inland Waterways" or the Code of Practice "Use of Standard Construction Methods for Bank and Bottom Protection on Waterways" issued by the BAW (Federal Waterways Engineering and Research Institute). Since the European Water Framework Directive has been put into action special emphasis was put on natural banks. Therefore the application of technical-biological bank protection is favoured. Currently design principles for technical-biological bank protection on inland waterways are missing. The existing experiences mainly refer to flowing waters with no or low ship-induced hydraulic loads on the banks. Since 2004 the Federal Waterways Engineering and Research Institute has been tracking the re-search and development project "Alternative Technical-Biological Bank Protection on Inland Water-ways" in company with the Federal Institute of Hydrology. The investigation to date includes the ex-amination of waterway sections where technical- biological bank protection is applied locally. For the development of design rules for technical-biological bank protection investigations shall be carried out in a next step, considering the mechanics and resilience of technical-biological bank protection with special attention to ship-induced hydraulic loads. The presentation gives a short introduction into hydraulic loads at inland waterways and their bank protection. More in detail model tests of a willow brush mattress as a technical-biological bank protec-tion in a wave basin are explained. Within the scope of these tests the brush mattresses were ex-posed to wave impacts to determine their resilience towards hydraulic loads. Since the developing pore water pressure is significant considering the slope stability under hydraulic load, particular atten-tion is paid to the interaction of willow roots and pore water pressure. Furthermore the occurring ero-sion is determined. The methods of measurements, test conditions and executions as well as first results will be presented.

  18. 10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2013-01-01 2013-01-01 false Contents of applications; technical information in final...

  19. 10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2012-01-01 2012-01-01 false Contents of applications; technical information in final...

  20. 10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2014-01-01 2014-01-01 false Contents of applications; technical information in final...

  1. 10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2011-01-01 2011-01-01 false Contents of applications; technical information in final...

  2. Minimally Invasive Implantable Fetal Micropacemaker: Mechanical Testing and Technical Refinements

    PubMed Central

    Zhou, Li; Vest, Adriana N.; Peck, Raymond A.; Sredl, Jonathan P.; Huang, Xuechen; Bar-Cohen, Yaniv; Silka, Michael J.; Pruetz, Jay D.; Chmait, Ramen H.; Loeb, Gerald E.

    2016-01-01

    This paper discusses the technical and safety requirements for cardiac pacing of a human fetus with heart failure and hydrops fetalis secondary to complete heart block. Engineering strategies to meet specific technical requirements were integrated into a systematic design and implementation consisting of a novel fetal micropacemaker, a percutaneous implantation system, and a sterile package that enables device storage and recharging maintenance in a clinical setting. We further analyzed observed problems on myocardial fixation and pacing lead fatigue previously reported in earlier preclinical trials. This paper describes the technical refinements of the implantable fetal micropacemaker to overcome these challenges. The mechanical performance has been extensively tested to verify the improvement of reliability and safety margins of the implantation system. PMID:27021067

  3. Improved self-contained breathing apparatus concept. Final report Oct 80-Jun 82

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    White, L.; Walker, J.

    1982-08-01

    Past operational experiences of USAF fire fighting and rescue teams have indicated the need for an improved self-contained breathing apparatus (SCBA). In October 1980, a contract was awarded to Electronic Data Systems, Panama City, Florida, to design and develop a prototype SCBA that would meet Air Force technical requirements. A prototype was designed, developed, and tested through a subcontract with Reimers Consultants, Falls Church, Virginia. This report describes the technical requirements, a detailed technical description of the unit, and the unmanned test procedures and results. The unmanned testing demonstrate that the prototype SCBA meets all performance requirements, except for weight.more » The fully charged prototype weights 34 pounds, the maximum acceptable weight is 30 pounds. With the other performance requirements either met or exceeded, manned testing of the SCBA can proceed.« less

  4. UTM Technical Capabilities Level 2 (TLC2) Test at Reno-Stead Airport.

    NASA Image and Video Library

    2016-10-06

    Test of Unmanned Aircraft Systems Traffic Management (UTM) technical capability Level 2 (TCL2) at Reno-Stead Airport, Nevada. During the test, five drones simultaneously crossed paths, separated by altitude. Two drones flew beyond visual line-of-sight and three flew within line-of-sight of their operators. Engineer Joey Mercer reviews flight paths using the UAS traffic management research platform UTM coordinator app to verify and validate flight paths.

  5. Laser geodynamic satellite thermal/optical/ vibrational analyses and testing. Volume 2: Technical report, book 1. [retroreflector design

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The results of the LAGEOS thermal/optical/vibrational analysis and test program are reported. Through analyses and tests it is verified that the MSFC LAGEOS design provides a retroreflector thermal environment which maintains acceptable retroflector internal thermal gradients. The technical results of the study, organized by the major task areas are presented. The interrelationships of the major tasks are described and the major decisions are identified.

  6. Johns Hopkins Perceptual Test; Technical Report 9. Disadvantaged Children and Their First School Experiences. ETS-Head Start Longitudinal Study. Technical Report Series.

    ERIC Educational Resources Information Center

    Gilbert, Lynn E.; Shipman, Virginia C.

    The Johns Hopkins Perceptual Test, a brief measure of intelligence in children, requires the child to choose a form identical to a standard. It consists of 3 practice and 30 test items, all involving black geometric figures printed on white cards. There is one booklet for stimulus cards and one for response cards. The child is presented with a…

  7. Relationship between Procedural Tactical Knowledge and Specific Motor Skills in Young Soccer Players

    PubMed Central

    Aquino, Rodrigo; Marques, Renato Francisco R.; Petiot, Grégory Hallé; Gonçalves, Luiz Guilherme C.; Moraes, Camila; Santiago, Paulo Roberto P.; Puggina, Enrico Fuini

    2016-01-01

    The purpose of this study was to investigate the association between offensive tactical knowledge and the soccer-specific motor skills performance. Fifteen participants were submitted to two evaluation tests, one to assess their technical and tactical analysis. The motor skills performance was measured through four tests of technical soccer skills: ball control, shooting, passing and dribbling. The tactical performance was based on a tactical assessment system called FUT-SAT (Analyses of Procedural Tactical Knowledge in Soccer). Afterwards, technical and tactical evaluation scores were ranked with and without the use of the cluster method. A positive, weak correlation was perceived in both analyses (rho = 0.39, not significant p = 0.14 (with cluster analysis); and rho = 0.35; not significant p = 0.20 (without cluster analysis)). We can conclude that there was a weak association between the technical and the offensive tactical knowledge. This shows the need to reflect on the use of such tests to assess technical skills in team sports since they do not take into account the variability and unpredictability of game actions and disregard the inherent needs to assess such skill performance in the game. PMID:29910300

  8. Technical Adequacy of Growth Estimates from a Computer Adaptive Test: Implications for Progress Monitoring

    ERIC Educational Resources Information Center

    Van Norman, Ethan R.; Nelson, Peter M.; Parker, David C.

    2017-01-01

    Computer adaptive tests (CATs) hold promise to monitor student progress within multitiered systems of support. However, the relationship between how long and how often data are collected and the technical adequacy of growth estimates from CATs has not been explored. Given CAT administration times, it is important to identify optimal data…

  9. Measuring Teachers' Efficacy Working with Diverse Student Needs: Testing a Measurement Model. Technical Report # 38

    ERIC Educational Resources Information Center

    Alonzo, Julie; Tindal, Gerald; McCoy, Jan

    2005-01-01

    This technical report describes the development, pilot testing, and revision of a survey instrument designed to measure secondary school teachers' perceptions of their efficacy working with students from diverse backgrounds. A brief review of relevant literature frames the current study in the context of survey development that is technically…

  10. Materials Testing and Quality Control Soils, 3-28. Military Curriculum Materials for Vocational and Technical Education.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. National Center for Research in Vocational Education.

    This instructional package on material testing and quality control of soils has been adapted from military curriculum materials for use in technical and vocational education programs. This short course presents basic information on soils as well as exploration, field identification, and laboratory procedures that will enable students completing…

  11. Around Marshall

    NASA Image and Video Library

    1963-01-15

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. The F-1 Engine test stand was built north of the massive S-IC test stand. The F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base, and was designed to assist in the development of the F-1 Engine. Capability is provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. Looking North, this aerial taken January 15, 1963, gives a closer view of the deep hole for the F-1 test stand site in the forefront. The S-IC test stand with towers prominent is to the right of center, and the Block House is seen left of center.

  12. TECHNICAL MANPOWER IN NEW YORK STATE. VOLUME II.

    ERIC Educational Resources Information Center

    AMATULLI, ANGELO; AND OTHERS

    THE JOB CONTENT OF THE TECHNICAL OCCUPATIONS AND THE TECHNICAL SKILLS AND SUBJECT MATTER KNOWLEDGES REQUIRED ARE BASED PRIMARILY ON INFORMATION SUPPLIED BY EMPLOYERS FROM 17,414 ESTABLISHMENTS IN NEW YORK STATE. DATA ARE ALSO GIVEN ON GRADE STRUCTURE, EDUCATION AND EXPERIENCE REQUIREMENTS, TESTS AND LICENSES REQUIRED FOR THE JOB, SOURCES OF…

  13. Editing in Technical Communication: Theory and Practice in Editing Processes at the Graduate Level.

    ERIC Educational Resources Information Center

    Masse, Roger E.

    At New Mexico State University, technical communication teachers have developed a course to teach editing processes to graduate students who take the advanced workshop in technical and professional communication. In this seminar group, students work on writing processes; editing processes; written, edited, and tested products; and oral processes…

  14. The Effect of Functional Flow Diagrams on Apprentice Aircraft Mechanics' Technical System Understanding.

    ERIC Educational Resources Information Center

    Johnson, Scott D.; Satchwell, Richard E.

    1993-01-01

    Describes an experimental study that tested the impact of a conceptual illustration on college students' understanding of the structure, function, and behavior of complex technical systems. The use of functional flow diagrams in aircraft mechanics' training is explained, a concept map analysis is discussed, and implications for technical training…

  15. AGARD Flight Test Techniques Series. Volume 13. Reliability and Maintainability (Fiabilite’ et Maintenabilite’).

    DTIC Science & Technology

    1995-02-01

    capabilities for the common benefit of the NATO community; — Providing scientific and technical advice and assistance to the Military Committee in the field...Exchange of scientific and technical information; — Providing assistance to member nations for the purpose of increasing their scientific and...technical potential; — Rendering scientific and technical assistance, as requested, to other NATO bodies and to member nations in connection with

  16. Study on the removal efficiency of UF membranes using bacteriophages in bench-scale and semi-technical scale.

    PubMed

    Kreissel, K; Bösl, M; Lipp, P; Franzreb, M; Hambsch, B

    2012-01-01

    To determine the removal efficiency of ultrafiltration (UF) membranes for nano-particles in the size range of viruses the state of the art uses challenge tests with virus-spiked water. This work focuses on bench-scale and semi-technical scale experiments. Different experimental parameters influencing the removal efficiency of the tested UF membrane modules were analyzed and evaluated for bench- and semi-technical scale experiments. Organic matter in the water matrix highly influenced the removal of the tested bacteriophages MS2 and phiX174. Less membrane fouling (low ΔTMP) led to a reduced phage reduction. Increased flux positively affected phage removal in natural waters. The tested bacteriophages MS2 and phiX174 revealed different removal properties. MS2, which is widely used as a model organism to determine virus removal efficiencies of membranes, mostly showed a better removal than phiX174 for the natural water qualities tested. It seems that MS2 is possibly a less conservative surrogate for human enteric virus removal than phiX174. In bench-scale experiments log removal values (LRV) for MS2 of 2.5-6.0 and of 2.5-4.5 for phiX174 were obtained for the examined range of parameters. Phage removal obtained with differently fabricated semi-technical modules was quite variable for comparable parameter settings, indicating that module fabrication can lead to differing results. Potting temperature and module size were identified as influencing factors. In conclusion, careful attention has to be paid to the choice of experimental settings and module potting when using bench-scale or semi-technical scale experiments for UF membrane challenge tests.

  17. [Update to ISO 15189:2012, and future prospects].

    PubMed

    Shimoda, Katsuji; Kubono, Katsuo

    2014-06-01

    ISO (the International Organization for Standardization) is a worldwide federation of national standard bodies (ISO member bodies). The work of preparing international standards is normally carried out through ISO technical committees. ISO 15189 was prepared by Technical Committee ISO/TC 212, clinical laboratory testing, and in vitro diagnostic test systems. This third edition replaces the second edition (ISO 15189:2007), which was technically revised. Medical laboratory services are essential for patient care and, therefore, have to be available to meet the needs of all patients and the clinical personnel responsible for the care of those patients.

  18. UTM Technical Capabilities Level 2 (TLC2) Test at Reno-Stead Airport.

    NASA Image and Video Library

    2016-10-06

    Test of Unmanned Aircraft Systems Traffic Management (UTM) technical capability Level 2 (TCL2) at Reno-Stead Airport, Nevada. During the test, five drones simultaneously crossed paths, separated by altitude. Two drones flew beyond visual line-of-sight and three flew within line-of-sight of their operators. Drone Co-habitation Services operates a Phantom 3 commercial multi-rotor unmanned aircraft, one of 11 vehicles in the UTM TCL2 demonstration that will fly beyond line of sight of the pilot in command in Nevada test.

  19. UTM Technical Capabilities Level 2 (TLC2) Test at Reno-Stead Airport.

    NASA Image and Video Library

    2016-10-06

    Test of Unmanned Aircraft Systems Traffic Management (UTM) technical capability Level 2 (TCL2) at Reno-Stead Airport, Nevada. During the test, five drones simultaneously crossed paths, separated by altitude. Two drones flew beyond visual line-of-sight and three flew within line-of-sight of their operators. Karen Bollinger pilot and Nick Atkins of Alaska Center for Unmanned Aircraft Systems Integration program fly Ptarmigan quadcopter, one of 11 vehicles in the UTM TCL2 demonstration that will fly beyond line of sight of the pilot in command in Nevada test.

  20. Survey of aircraft icing simulation test facilities in North America

    NASA Technical Reports Server (NTRS)

    Olsen, W.

    1981-01-01

    A survey was made of the aircraft icing simulation facilities in North America: there are 12 wind tunnels, 28 engine test facilities, 6 aircraft tankers and 14 low velocity facilities, that perform aircraft icing tests full or part time. The location and size of the facility, its speed and temperature range, icing cloud parameters, and the technical person to contact are surveyed. Results are presented in tabular form. The capabilities of each facility were estimated by its technical contact person. The adequacy of these facilities for various types of icing tests is discussed.

Top