Science.gov

Sample records for rehabilitation demonstration project

  1. 20 CFR 404.1599 - Work incentive experiments and rehabilitation demonstration projects in the disability program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Work incentive experiments and rehabilitation... Continuing Or Stopping Disability § 404.1599 Work incentive experiments and rehabilitation demonstration... beneficiaries to return to work and leave benefit rolls. These experiments and demonstration projects will...

  2. Documentation of the Range 8C rehabilitation demonstration project at Hohenfels Training Area, West Germany

    SciTech Connect

    Zellmer, S.D.; Hinchman, R.R.; Carter, R.P.; Severinghaus, W.D.; Lacey, R.M.; Brent, J.J.

    1987-03-01

    Continued and intensive tactical training for the last 35 years at the Hohenfels Training Area (HTA), Federal Republic of Germany, has resulted in extensive environmental damage and reduced training realism. The US Corps of Engineers Construction Engineering Research Laboratory is developing an Integrated Training Area Management (ITAM) Program for the Seventh Army Training Command for use at HTA. Argonne National Laboratory was asked to assist in one element of the ITAM program, a training range rehabilitation demonstration project. The rehabilitation project was begun in 1986 on a 62-ha watershed that included about 16 ha of meadow with training damage typical of HTA. On the basis of amount of plant ground cover, type and degree of erosion, and soil properties, 10 rehabilitation prescriptions were developed to reestablish plant cover, control erosion, and improve training realism. Prescriptions were installed by a local contractor in September 1986. A monitoring program is under way to determine the effectiveness of this effort. Results and experience gained from this project will be used in the ITAM program and for rehabilitation training courses conducted at HTA.

  3. 20 CFR 404.1599 - Work incentive experiments and rehabilitation demonstration projects in the disability program.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false Work incentive experiments and rehabilitation... Continuing Or Stopping Disability § 404.1599 Work incentive experiments and rehabilitation demonstration... Disability Amendments of 1980, Pub. L. 96-265, directs the Commissioner to develop and conduct...

  4. 20 CFR 404.1599 - Work incentive experiments and rehabilitation demonstration projects in the disability program.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false Work incentive experiments and rehabilitation... Continuing Or Stopping Disability § 404.1599 Work incentive experiments and rehabilitation demonstration... Disability Amendments of 1980, Pub. L. 96-265, directs the Commissioner to develop and conduct...

  5. 20 CFR 404.1599 - Work incentive experiments and rehabilitation demonstration projects in the disability program.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Work incentive experiments and rehabilitation... Continuing Or Stopping Disability § 404.1599 Work incentive experiments and rehabilitation demonstration... Disability Amendments of 1980, Pub. L. 96-265, directs the Commissioner to develop and conduct...

  6. A PROJECT DEMONSTRATING THE EFFECTIVENESS OF VOCATIONAL REHABILITATION SERVICES IN A TOTAL PSYCHIATRIC CARE PROGRAM.

    ERIC Educational Resources Information Center

    Georgia State Board of Health, Atlanta.

    A COOPERATIVE PROGRAM OFFERED A COMPLETE RANGE OF INTEGRATED MEDICAL, PSYCHOLOGICAL, SOCIAL, AND VOCATIONAL SERVICES TO REINTEGRATE MENTAL PATIENTS INTO THE LIFE OF THE COMMUNITY. THE PROGRAM PROPOSED TO DEMONSTRATE THE EFFECTIVENESS OF CERTAIN REHABILITATION PROCEDURES TO EXTEND AND IMPROVE REHABILITATION SERVICES, AND TO ESTABLISH EFFECTIVE…

  7. Range 8C Rehabilitation Demonstration Project, Hohenfels Training Area, Germany: Final report

    SciTech Connect

    Zellmer, S.D.; Hinchman, R.R.; Johnson, D.O. . Energy Systems Div.); Severinghaus, W.D. ); Brent, J.J. )

    1991-11-01

    More than 30 years of intensive and continual tactical training has caused extensive environmental damage at the US Army Hohenfels Training Area in Germany. The Range 8C Rehabilitation Demonstration Project, followed by a three-year monitoring effort, was conducted to develop and evaluate the environmental and economic effectiveness of seven revegetation and four erosion control prescriptions implemented at a 16-ha site. The point-intercept method was used to measure the types and amounts of vegetation established and the changes in the vegetative community during three years of military use on the seven areas treated with revegetation prescriptions. Field observations were made to determine the suitability and durability of four types of erosion control structures. Soil fertility and a source of seed appeared to be the most limiting factors in establishing vegetation, while seedbed preparation had only a minor influence. Grasses appeared to be more resistant to vehicle traffic than did other types of vegetation. Because grassed waterways were used as roads by military vehicles and a system of graded terraces was expensive, these erosion control prescriptions were unsuitable and uneconomical for use on training areas. Low-cost riprap waterbars and porous check dams slowed the velocity of runoff, trapped sediments, and were durable. Recommendations were formulated to improve the environmental and economic effectiveness of future rehabilitation efforts on tactical training areas.

  8. 20 CFR 404.1599 - Work incentive experiments and rehabilitation demonstration projects in the disability program.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... and demonstration projects designed to provide more cost-effective ways of encouraging disabled... validity of the research. Each experiment and demonstration project will have a termination date (up to...

  9. West Valley Demonstration Project

    SciTech Connect

    Not Available

    1991-01-01

    Under the West Valley Demonstration Project Act, Public Law 96-368, liquid high-level radioactive waste stored at the Western New York Nuclear Service Center in West Valley, New York, is to be solidified (vitrified) in borosilicate glass and transported to a federal repository for geologic disposal. This waste material resulted from spent nuclear fuel reprocessing operations conducted between 1966 and 1972. Project costs are shared by the US Department of Energy (90 percent) and the New York State Energy Research and Development Authority (10 percent). The site on which the Project is located is owned by New York State. This report is an overview of West Valley's plans and accomplishments.

  10. NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT

    SciTech Connect

    Terry W. Battiest

    2008-06-11

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

  11. Nucla CFB Demonstration Project

    SciTech Connect

    Not Available

    1990-12-01

    This report documents Colorado-Ute Electric Association's Nucla Circulating Atmospheric Fluidized-Bed Combustion (AFBC) demonstration project. It describes the plant equipment and system design for the first US utility-size circulating AFBC boiler and its support systems. Included are equipment and system descriptions, design/background information and appendices with an equipment list and selected information plus process flow and instrumentation drawings. The purpose of this report is to share the information gathered during the Nucla circulating AFBC demonstration project and present it so that the general public can evaluate the technical feasibility and cost effectiveness of replacing pulverized or stoker-fired boiler units with circulating fluidized-bed boiler units. (VC)

  12. ARJIS satellite demonstration project

    NASA Astrophysics Data System (ADS)

    Severance, Steve; Williams, Carl

    2005-06-01

    In 2003, the California Space Authority (CSA) was provided funding by the U. S. Congress through the Defense Appropriations Act to develop a project that would demonstrate the U.S. space enterprise capability that would contribute to the effectiveness of those engaged in Homeland Security. The project was given broad latitude in selecting the area of Homeland Security to be addressed and the nature of the space technology to be applied. CSA became aware of a nascent law enforcement data-sharing project in the San Diego region known as the Automated Regional Justice Information System (ARJIS). First developed by the police departments in San Diego, ARJIS is an innovative system that shares criminal justice information among 50 federal, state, and local agencies. ARJIS was completing a pilot project that enabled officers to receive information on handheld computers, which was transmitted wirelessly through cellular networks. The accessed information came from several databases that collectively contained the entire region's crime and arrest reports, traffic citations, and incidents, as well as state and county wants and warrants. The fundamental limitations that plague all cellular-based devices caught CSA's attention and resulted in a cooperative effort to harden the communications link between the patrol officer and critical data. The principal goal of the SATCOM development task was to create a proof-of-concept application that would use SATCOM links to augment the current ARJIS handheld wireless (cellular) capability. The successful technical demonstration and the positive support for satellite communications from the law enforcement community showed that this project filled a need-both for improved information sharing and for highly reliable communications systems.

  13. Smart Grid Demonstration Project

    SciTech Connect

    Miller, Craig; Carroll, Paul; Bell, Abigail

    2015-03-11

    The National Rural Electric Cooperative Association (NRECA) organized the NRECA-U.S. Department of Energy (DOE) Smart Grid Demonstration Project (DE-OE0000222) to install and study a broad range of advanced smart grid technologies in a demonstration that spanned 23 electric cooperatives in 12 states. More than 205,444 pieces of electronic equipment and more than 100,000 minor items (bracket, labels, mounting hardware, fiber optic cable, etc.) were installed to upgrade and enhance the efficiency, reliability, and resiliency of the power networks at the participating co-ops. The objective of this project was to build a path for other electric utilities, and particularly electrical cooperatives, to adopt emerging smart grid technology when it can improve utility operations, thus advancing the co-ops’ familiarity and comfort with such technology. Specifically, the project executed multiple subprojects employing a range of emerging smart grid technologies to test their cost-effectiveness and, where the technology demonstrated value, provided case studies that will enable other electric utilities—particularly electric cooperatives— to use these technologies. NRECA structured the project according to the following three areas: Demonstration of smart grid technology; Advancement of standards to enable the interoperability of components; and Improvement of grid cyber security. We termed these three areas Technology Deployment Study, Interoperability, and Cyber Security. Although the deployment of technology and studying the demonstration projects at coops accounted for the largest portion of the project budget by far, we see our accomplishments in each of the areas as critical to advancing the smart grid. All project deliverables have been published. Technology Deployment Study: The deliverable was a set of 11 single-topic technical reports in areas related to the listed technologies. Each of these reports has already been submitted to DOE, distributed to co-ops, and

  14. Tidd PFBC demonstration project

    SciTech Connect

    Marrocco, M.

    1997-12-31

    The Tidd project was one of the first joint government-industry ventures to be approved by the US Department of Energy (DOE) in its Clean Coal Technology Program. In March 1987, DOE signed an agreement with the Ohio Power Company, a subsidiary of American Electric Power, to refurbish the then-idle Tidd plant on the banks of the Ohio River with advanced pressurized fluidized bed technology. Testing ended after 49 months of operation, 100 individual tests, and the generation of more than 500,000 megawatt-hours of electricity. The demonstration plant has met its objectives. The project showed that more than 95 percent of sulfur dioxide pollutants could be removed inside the advanced boiler using the advanced combustion technology, giving future power plants an attractive alternative to expensive, add-on scrubber technology. In addition to its sulfur removal effectiveness, the plant`s sustained periods of steady-state operation boosted its availability significantly above design projections, heightening confidence that pressurized fluidized bed technology will be a reliable, baseload technology for future power plants. The technology also controlled the release of nitrogen oxides to levels well below the allowable limits set by federal air quality standards. It also produced a dry waste product that is much easier to handle than wastes from conventional power plants and will likely have commercial value when produced by future power plants.

  15. PFBC Utility Demonstration Project

    SciTech Connect

    Not Available

    1992-11-01

    This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP's proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

  16. 76 FR 37090 - Final Priorities; Disability and Rehabilitation Research Projects and Centers Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... research, demonstration projects, training, and related activities, including international activities; to... Final Priorities; Disability and Rehabilitation Research Projects and Centers Program AGENCY: Office of... for two Rehabilitation Engineering Research Centers (RERCs). SUMMARY: The Assistant Secretary...

  17. Soil bioventing demonstration project

    SciTech Connect

    Cho, J.S.; Kampbell, D.H.; Wilson, J.T.; DiGiulio, D.C.

    1990-01-01

    A pilot scale demonstration project of a soil bioventing system, which utilizes the biodegradation in soil and physical removal of VOC by induced air flow, is in operation at the U.S. Coast Guard Aviation Field in Traverse City, Michigan. The system is being tested to determine its suitability for remediation of the vadose zone in conjunction with aquifer remediation at a site contaminated by an aviation gas spill. Several microcosm studies with soil obtained from the vertical profile of the contaminated site showed rapid microbial decompositions of hydrocarbon fumes with NPK nutrient and moisture addition. Basic removal kinetics data were obtained from these experiments. Field pneumatic pump tests for soil-air characterization have been conducted. The soil-air permeability and pressure distributions under the air injection/withdrawal systems were obtained. On the basis of information from the laboratory and field tests, a conceptual design at a field scale was made. The system will be implemented on the selected study site and the operation will start in fall, 1990. Additional soil core samplings and continuous monitoring of operation are planned.

  18. 34 CFR 359.1 - What is the Special Projects and Demonstrations for Spinal Cord Injuries Program?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... EDUCATION DISABILITY AND REHABILITATION RESEARCH: SPECIAL PROJECTS AND DEMONSTRATIONS FOR SPINAL CORD... evaluation of comprehensive medical, vocational, and other rehabilitation services to meet the wide range...

  19. 34 CFR 359.1 - What is the Special Projects and Demonstrations for Spinal Cord Injuries Program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... EDUCATION DISABILITY AND REHABILITATION RESEARCH: SPECIAL PROJECTS AND DEMONSTRATIONS FOR SPINAL CORD... evaluation of comprehensive medical, vocational, and other rehabilitation services to meet the wide range...

  20. LIMB Demonstration Project Extension

    SciTech Connect

    Not Available

    1988-03-15

    The basic goal of the Limestone Injection Multistage Burner (LIMB) demonstration is to extend LIMB technology development to a full-scale application on a representative wall-fired utility boiler. The successful retrofit of LIMB to an existing boiler is expected to demonstrate that (a) reductions of 50 percent or greater in SO{sub x} and NO{sub x} emissions can be achieved at a fraction of the cost of add-on FGD systems, (b) boiler reliability, operability, and steam production can be maintained at levels existing prior to LIMB retrofit, and (c) technical difficulties attributable to LIMB operation, such as additional slagging and fouling, changes in ash disposal requirements, and an increased particulate load, can be resolved in a cost-effective manner. The primary fuel to be used will be an Ohio bituminous coal having a nominal sulfur content of 3 percent or greater.

  1. LIMB Demonstration Project Extension

    SciTech Connect

    Not Available

    1988-09-15

    The basic goal of the Limestone Injection Multistage Burner (LIMB) demonstration is to extend LIMB technology development to a full-scale application on a representative wall-fired utility boiler. The successful retrofit of LIMB to an existing boiler is expected to demonstrate that (a) reductions of 50 percent or greater in SO and NO emissions can be achieved at a fraction of the cost of add-on FGD systems, (b) boiler reliability, operability, and steam production can be maintained at levels existing prior to LIMB retrofit, and (c) technical difficulties attributable to LIMB operation, such as additional slagging and fouling, changes in ash disposal requirements, and an increased particulate load, can be resolved in a cost-effective manner. The primary fuel to be used will be an Ohio bituminous coal having a nominal sulfur content of 3 percent or greater.

  2. LIMB Demonstration Project Extension

    SciTech Connect

    Not Available

    1989-08-15

    The subject of this report is progress during the quarter for Phase I -- Design and Permitting, Phase II -- Coolside/LIMB Construction, Start-Up and Phase III -- Operation, Data Collection, Reporting and Disposition. Under Phase I, Task 2, Consol Technology Transfer, Consol R D continued to review the status of the Coolside installation and identified construction details which required additional action. Activities in Task 4.0 -- Permitting and Licensing have focused on finalizing a subcontract agreement for trucking the DOE Coolside/LIMB ash to a solid waste landfill. Under Phase II, Task 1, Project Management, purchase orders were placed with two (2) lime suppliers for supplying the specified hydrated lime to be used for the Coolside test program. For Subtask 2.2 -- Sorbent Feed System Installation, the construction and installation of the sorbent feed system has been completed. Under Phase III, Subtask 2.1, Optimization of the Coolside sorbent feed system, the ash recycle system and the caustic injection system were initiated. 3 figs.

  3. Solar Thermal Demonstration Project

    SciTech Connect

    Biesinger, K; Cuppett, D; Dyer, D

    2012-01-30

    HVAC Retrofit and Energy Efficiency Upgrades at Clark High School, Las Vegas, Nevada The overall objectives of this project are to increase usage of alternative/renewable fuels, create a better and more reliable learning environment for the students, and reduce energy costs. Utilizing the grant resources and local bond revenues, the District proposes to reduce electricity consumption by installing within the existing limited space, one principal energy efficient 100 ton adsorption chiller working in concert with two 500 ton electric chillers. The main heating source will be primarily from low nitrogen oxide (NOX), high efficiency natural gas fired boilers. With the use of this type of chiller, the electric power and cost requirements will be greatly reduced. To provide cooling to the information technology centers and equipment rooms of the school during off-peak hours, the District will install water source heat pumps. In another measure to reduce the cooling requirements at Clark High School, the District will replace single pane glass and metal panels with Kalwall building panels. An added feature of the Kalwall system is that it will allow for natural day lighting in the student center. This system will significantly reduce thermal heat/cooling loss and control solar heat gain, thus delivering significant savings in heating ventilation and air conditioning (HVAC) costs.

  4. Freihoelser Forst Local Training Area rehabilitation project

    SciTech Connect

    Hinchman, R.R.; Zellmer, S.D.; Johnson, D.O.; Severinghaus, W.D.; Brent, J.J. . Environmental Div.)

    1991-12-01

    Intensive and continued use of the Freihoelser Forst Local Training Area (LTA) for military training activities had resulted in serious environmental problems, exemplified by a lack of vegetative cover and severe erosion by water and wind. The project's goal was to develop and demonstrate rapid, cost-effective methods to stabilize the LTA's barren, eroding maneuver areas and make training conditions more realistic. The major factors limiting rehabilitation efforts were the sandy, infertile, and acidic soils. The project was conducted in two phases. Phase I demonstrated and evaluated three separate rehabilitation treatments ranging in cost from moderate to expensive. Each treatment used a different type of soil amendment (fertilizer and straw, compost, or chicken manure), but all used identical seedbed preparation methods and seed mixtures. Phase I was conducted on relatively small replicated plots and was monitored three times during each growing season. All three treatments satisfactorily reestablished vegetation and controlled erosion. Because of their small size, the Phase I demonstration plots had only a minor stabilizing effect on the erosion problems of the LTA as a whole. The Phase II treatment was based on lessons teamed from Phase I and from other revegetation projects in Germany. Phase II revegetated a large area of the LTA, which included nearly all of the most severely disturbed land. Phase II, which was monitored in the same way as Phase I but for a shorter period of time, was highly successful in stabilizing most areas treated. The revegetation plant community was dominated by native grasses and legumes that stabilized the loose, sandy soils and improved the training realism of a major portion of the LTA.

  5. Earth Science Capability Demonstration Project

    NASA Technical Reports Server (NTRS)

    Cobleigh, Brent

    2006-01-01

    A viewgraph presentation reviewing the Earth Science Capability Demonstration Project is shown. The contents include: 1) ESCD Project; 2) Available Flight Assets; 3) Ikhana Procurement; 4) GCS Layout; 5) Baseline Predator B Architecture; 6) Ikhana Architecture; 7) UAV Capability Assessment; 8) The Big Picture; 9) NASA/NOAA UAV Demo (5/05 to 9/05); 10) NASA/USFS Western States Fire Mission (8/06); and 11) Suborbital Telepresence.

  6. Demonstration project cuts red tape

    NASA Astrophysics Data System (ADS)

    Katzoff, Judith A.

    Results from a demonstration project aimed at cutting red tape in federal grants for basic research at universities are "very encouraging" so far, according to Don I. Phillips, executive director of the Government-University-Industry Research Roundtable. The roundtable is coordinating the experimental effort, with the participation of five major federal agencies as well as the Florida state university system and the University of Miami (a private institution in Coral Gables, Fla.).Under the project, special conditions apply to grants from the participating agencies to individual researchers at the participating universities: Investigators do not have to ask the agency's permission for changes in budget allocations, purchases of permanent equipment, or foreign travel. Grant money can be spent up to a year after the grant ends without a special request. Under this plan, researchers, with agency approval, can also ask to have their entire research program covered as a single administrative entity, rather than as several individual projects.

  7. Mars oxygen processor demonstration project

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The objective of the 1986-87 space system design project was to design and procure the hardware necessary to demonstrate continuous production of oxygen from simulated Mars atmosphere. The work was an extension of a design project that was started during the previous academic year. A yttria stabilized, zirconium oxide electrochemical cell was operated in a controlled temperature environment to separate oxygen, which has been dissociated thermally from the primary constituent of the Martian atmosphere-carbon dioxide. This system was perhaps the most primitive chemical processor that could be developed as part of an extraterrestrial chemicals production demonstration project. The course began in January, 1987. Speakers were brought in to discuss the Martian environment, concepts for resource extraction and system requirements for an autonomous chemical processor. The class simultaneously refined its work plans, which were developed as part of the fall semester senior seminar course. Hardware was purchased using funds provided by the Planetary Society. However, the key hardware element was the zirconia cell. Development of that type of cell is beyond the capabilities of undergraduate engineering students. Consequently, the cell was borrowed. The design elements emphasized in this project were as follows: (1) System reliability analysis; (2) Autonomous operation and control; (3) High temperature seal design; (4) Design for minimum thermal stress; (5) Passive shut down environmental control; (6) Integrated instrumentation concepts; (7) Identification of extraterrestrial resources; (8) Evaluation of chemical processor concepts; (9) Integrated hardware design; and (10) Finite element analysis.

  8. Clean Coal Diesel Demonstration Project

    SciTech Connect

    Robert Wilson

    2006-10-31

    A Clean Coal Diesel project was undertaken to demonstrate a new Clean Coal Technology that offers technical, economic and environmental advantages over conventional power generating methods. This innovative technology (developed to the prototype stage in an earlier DOE project completed in 1992) enables utilization of pre-processed clean coal fuel in large-bore, medium-speed, diesel engines. The diesel engines are conventional modern engines in many respects, except they are specially fitted with hardened parts to be compatible with the traces of abrasive ash in the coal-slurry fuel. Industrial and Municipal power generating applications in the 10 to 100 megawatt size range are the target applications. There are hundreds of such reciprocating engine power-plants operating throughout the world today on natural gas and/or heavy fuel oil.

  9. 76 FR 12717 - Disability and Rehabilitation Research Projects and Centers Program; Field Initiated (FI...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... Disability and Rehabilitation Research Projects and Centers Program; Field Initiated (FI) Projects; Office of Special Education and Rehabilitative Services; Overview Information; National Institute on Disability and Rehabilitation Research (NIDRR)--Disability and Rehabilitation Research Projects and Centers...

  10. Exploration Medical System Demonstration Project

    NASA Technical Reports Server (NTRS)

    Chin, D. A.; McGrath, T. L.; Reyna, B.; Watkins, S. D.

    2011-01-01

    A near-Earth Asteroid (NEA) mission will present significant new challenges including hazards to crew health created by exploring a beyond low earth orbit destination, traversing the terrain of asteroid surfaces, and the effects of variable gravity environments. Limited communications with ground-based personnel for diagnosis and consultation of medical events require increased crew autonomy when diagnosing conditions, creating treatment plans, and executing procedures. Scope: The Exploration Medical System Demonstration (EMSD) project will be a test bed on the International Space Station (ISS) to show an end-to-end medical system assisting the Crew Medical Officers (CMO) in optimizing medical care delivery and medical data management during a mission. NEA medical care challenges include resource and resupply constraints limiting the extent to which medical conditions can be treated, inability to evacuate to Earth during many mission phases, and rendering of medical care by a non-clinician. The system demonstrates the integration of medical technologies and medical informatics tools for managing evidence and decision making. Project Objectives: The objectives of the EMSD project are to: a) Reduce and possibly eliminate the time required for a crewmember and ground personnel to manage medical data from one application to another. b) Demonstrate crewmember's ability to access medical data/information via a software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities. d) Develop a common data management architecture that allows for scalability, extensibility, and interoperability of data sources and data users. e) Lower total cost of ownership for development and sustainment of peripheral hardware and software that use EMSD for data management f) Provide

  11. Heber Geothermal Binary Demonstration Project

    SciTech Connect

    Allen, R.F.; Nelson, T.T.

    1983-12-01

    The project background and objectives are discussed. The following are described: the power cycle, design progress, turbine generators; heat exchangers and condensers, materials selection, heat sales contract, and construction. (MHR)

  12. 75 FR 47798 - Office of Special Education and Rehabilitative Services-Special Demonstration Programs-Model...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Office of Special Education and Rehabilitative Services--Special Demonstration Programs--Model...) Served by State Vocational Rehabilitation (VR) Agencies AGENCY: Office of Special Education...

  13. Engineered Geothermal System Demonstration Project

    SciTech Connect

    Petty, Susan

    2014-06-19

    In June 2009, AltaRock Energy began field work on a project supported by the U.S. Department of Energy entitled “Use of Multiple Stimulations to Improve Economics of Engineered Geothermal Systems in Shallow High Temperature Intrusives.” The goal of the project was to develop an Engineered Geothermal System (EGS) in the portion of The Geysers geothermal field operated by the Northern California Power Agency (NCPA). The project encountered several problems while deepening Well E-7 which culminated in the suspension of field activities in September 2009. Some of the problems encountered are particular to The Geysers area, while others might be encountered in any geothermal field, and they might be avoided in future operations.

  14. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous...

  15. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous...

  16. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous...

  17. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous...

  18. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous...

  19. DEMONSTRATION AND QUALITY ASSURANCE PROJECT ...

    EPA Pesticide Factsheets

    The demonstration of technologies for determining the presence of dioxin in soil and sediment is being conducted under the U.S. Environmental Protection Agency Superfund Innovative Technology Evaluation Program in Saginaw, Michigan, at Green Point Environmental Learning Center from approximately April 26 to May 6, 2004. The primary purpose of the demonstration is to evaluate innovative monitoring technologies. The technologies listed below will be demonstrated. .AhRC PCRTM Kit, Hybrizyme Corporation .Ah-IMMUNOASSY@ Kit, Paralsian, Inc. .Coplanar PCB Immunoassay Kit, Abraxis LLC .DF-l Dioxin/Furan Immunoassay Kit, CAPE Technologies L.L.C. .CALUX@ by Xenobiotic Detection Systems, Inc- .Dioxin ELISA Kit, Wako Pure Chemical Industries LTD. This demonstration plan describes the procedures that will be used to verify the performance and cost of these technologies. The plan incorporates the quality assurance and quality control elements needed to generate data of sufficient quality to document each technology's performance and cost. A separate innovative technology verification report (ITVR) will.be prepared for each technology. The ITVRs will present the demonstration findings associated with the demonstration objectives. The objective of this program is to promote the acceptance and use of innovative field technologies by providing well-documented performance and cost data obtained from field demonstrations.

  20. Vehicle to Grid Demonstration Project

    SciTech Connect

    Willett Kempton; Meryl Gardner; Michael Hidrue; Fouad Kamilev; Sachin Kamboj; Jon Lilley; Rodney McGee; George Parsons; Nat Pearre; Keith Trnka

    2010-12-31

    This report summarizes the activities and accomplishments of a two-year DOE-funded project on Grid-Integrated Vehicles (GIV) with vehicle to grid power (V2G). The project included several research and development components: an analysis of US driving patterns; an analysis of the market for EVs and V2G-capable EVs; development and testing of GIV components (in-car and in-EVSE); interconnect law and policy; and development and filing of patents. In addition, development activities included GIV manufacturing and licensing of technologies developed under this grant. Also, five vehicles were built and deployed, four for the fleet of the State of Delaware, plus one for the University of Delaware fleet.

  1. DEMONSTRATION AND QUALITY ASSURANCE PROJECT ...

    EPA Pesticide Factsheets

    A demonstration of field portable/mobile technologies for measuring trace elements in soil and sediments was conducted under the U.S. Environmental Protection Agency Superfund Innovative Technology Evaluation (SITE) Program. The demonstration took place from January 24 to 28, 2005, at the Kennedy Athletic, Recreational and Social Park at Kennedy Space Center on Merritt Island, Florida. The purpose of the demonstration was to verify the performance of various instruments that employ X-ray fluorescence (XRF) measurement technologies for the determination of 13 toxic elements in a variety of soil and sediment samples. Instruments from the technology developers listed below were demonstrated. o Innov-X Systems, Inc.o NITON LLC (2 instruments ) o Oxford Instruments Portable Division (formerly Metorex, Inc.) .Oxford Instruments Analytical .Rigaku, Inc.o RONTEC USA Inc.o Xcalibur XRF Services Inc. (Division of Elvatech Ltd. ) This demonstration plan describes the procedures that will be used to verify the performance and cost of the XRF instruments provided by these technology developers. The plan incorporates the quality assurance and quality control elements needed to generate data of sufficient quality to perform this verification. A separate innovative technology verification report (ITVR) will be prepared for each instrument. The objective of this program is to promote the acceptance and use of innovative field technologies by providing well-documented perfor

  2. LADWP FUEL CELL DEMONSTRATION PROJECT

    SciTech Connect

    Thai Ta

    2003-09-12

    Los Angeles Department of Water and Power (LADWP) is currently one of the most active power utility companies in researching fuel cell technology. Fuel cells offer many benefits and are now used as an alternative to traditional internal combustion engines in power generation. In continuing it's role as the leader in fuel cell research, LADWP has installed a pre-commercial molten carbonate fuel cell on August 2001 at its headquarter, the John Ferraro Building (JFB). The goal of this project is to learn more about the actual behavior of the fuel cell running under real world conditions. The fuel cell ran smoothly through the first year of operation with very high efficiency, but with some minor setbacks. The JFB fuel cell project is funded by the City of Los Angeles Department of Water and Power with partial grant funding from the Department of Defense's Climate Change Fuel Cell Buydown Program. The technical evaluation and the benefit-cost evaluation of the JFB fuel cell are both examined in this report.

  3. Youth Offender Demonstration Project Technical Assistance.

    ERIC Educational Resources Information Center

    MacGillivray, Lois

    The Youth Offender Demonstration Project (YODP) combined oversight of youth offenders with services to support youth offenders' passage into the word of work by providing recommended social development strategies for youth offenders. YODP demonstration projects were funded in the following categories: (1) model community projects; (2) education…

  4. Navy fuel cell demonstration project.

    SciTech Connect

    Black, Billy D.; Akhil, Abbas Ali

    2008-08-01

    This is the final report on a field evaluation by the Department of the Navy of twenty 5-kW PEM fuel cells carried out during 2004 and 2005 at five Navy sites located in New York, California, and Hawaii. The key objective of the effort was to obtain an engineering assessment of their military applications. Particular issues of interest were fuel cell cost, performance, reliability, and the readiness of commercial fuel cells for use as a standalone (grid-independent) power option. Two corollary objectives of the demonstration were to promote technological advances and to improve fuel performance and reliability. From a cost perspective, the capital cost of PEM fuel cells at this stage of their development is high compared to other power generation technologies. Sandia National Laboratories technical recommendation to the Navy is to remain involved in evaluating successive generations of this technology, particularly in locations with greater environmental extremes, and it encourages their increased use by the Navy.

  5. Demonstration of Innovative Water Rehabilitation Technology in Somerville, NJ

    EPA Science Inventory

    Renewal technologies currently being used for the repair, replacement and/or rehabilitation of deteriorating water distribution systems are generally effective, but there is still considerable room for improvement of existing technologies and for the development of new technologi...

  6. The IGRE's 100 kilowatt demonstration project

    NASA Astrophysics Data System (ADS)

    Leonard, R. S.

    It is asserted that a low cost demonstration project is the only way that both the market resistance and inertia of government agencies will be overcome. Using Soviet launchers and terrestrial type solar cells a 100 kilowatt demonstration project is possible for approximately 150 million dollars. Using a Soviet Topaz II nuclear thermonic reactor, higher frequencies, a nuclear safe orbit of 900 km and a PROTON launcher, a 20 kilowatt demonstration project for less than 100 million is possible.

  7. 77 FR 40596 - Applications for New Awards: Disability and Rehabilitation Research Projects and Centers Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... Applications for New Awards: Disability and Rehabilitation Research Projects and Centers Program; Disability and Rehabilitation Research Projects; Employment of Individuals With Disabilities AGENCY: Office of... Information National Institute on Disability and Rehabilitation Research (NIDRR)-- Disability...

  8. 77 FR 40590 - Applications for New Awards: Disability and Rehabilitation Research Projects and Centers Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... Applications for New Awards: Disability and Rehabilitation Research Projects and Centers Program; Disability and Rehabilitation Research Projects; Burn Model Systems Centers; Correction AGENCY: Office of Special... Information: National Institute on Disability and Rehabilitation Research (NIDRR)--Disability...

  9. Composite Cryotank Technologies and Demonstration Project

    NASA Video Gallery

    The Composite Cryogenic Propellant Tank project will develop and ground demonstrate large-scale composite cryogenic propellant tanks applicable to heavy-lift launch vehicles, propellant depots, and...

  10. Freihoelser Forst Local Training Area rehabilitation project. Final report

    SciTech Connect

    Hinchman, R.R.; Zellmer, S.D.; Johnson, D.O.; Severinghaus, W.D.; Brent, J.J.

    1991-12-01

    Intensive and continued use of the Freihoelser Forst Local Training Area (LTA) for military training activities had resulted in serious environmental problems, exemplified by a lack of vegetative cover and severe erosion by water and wind. The project`s goal was to develop and demonstrate rapid, cost-effective methods to stabilize the LTA`s barren, eroding maneuver areas and make training conditions more realistic. The major factors limiting rehabilitation efforts were the sandy, infertile, and acidic soils. The project was conducted in two phases. Phase I demonstrated and evaluated three separate rehabilitation treatments ranging in cost from moderate to expensive. Each treatment used a different type of soil amendment (fertilizer and straw, compost, or chicken manure), but all used identical seedbed preparation methods and seed mixtures. Phase I was conducted on relatively small replicated plots and was monitored three times during each growing season. All three treatments satisfactorily reestablished vegetation and controlled erosion. Because of their small size, the Phase I demonstration plots had only a minor stabilizing effect on the erosion problems of the LTA as a whole. The Phase II treatment was based on lessons teamed from Phase I and from other revegetation projects in Germany. Phase II revegetated a large area of the LTA, which included nearly all of the most severely disturbed land. Phase II, which was monitored in the same way as Phase I but for a shorter period of time, was highly successful in stabilizing most areas treated. The revegetation plant community was dominated by native grasses and legumes that stabilized the loose, sandy soils and improved the training realism of a major portion of the LTA.

  11. Irvine Smart Grid Demonstration, a Regional Smart Grid Demonstration Project

    SciTech Connect

    Yinger, Robert; Irwin, Mark

    2015-12-29

    ISGD was a comprehensive demonstration that spanned the electricity delivery system and extended into customer homes. The project used phasor measurement technology to enable substation-level situational awareness, and demonstrated SCE’s next-generation substation automation system. It extended beyond the substation to evaluate the latest generation of distribution automation technologies, including looped 12-kV distribution circuit topology using URCIs. The project team used DVVC capabilities to demonstrate CVR. In customer homes, the project evaluated HAN devices such as smart appliances, programmable communicating thermostats, and home energy management components. The homes were also equipped with energy storage, solar PV systems, and a number of energy efficiency measures (EEMs). The team used one block of homes to evaluate strategies and technologies for achieving ZNE. A home achieves ZNE when it produces at least as much renewable energy as the amount of energy it consumes annually. The project also assessed the impact of device-specific demand response (DR), as well as load management capabilities involving energy storage devices and plug-in electric vehicle charging equipment. In addition, the ISGD project sought to better understand the impact of ZNE homes on the electric grid. ISGD’s SENet enabled end-to-end interoperability between multiple vendors’ systems and devices, while also providing a level of cybersecurity that is essential to smart grid development and adoption across the nation. The ISGD project includes a series of sub-projects grouped into four logical technology domains: Smart Energy Customer Solutions, Next-Generation Distribution System, Interoperability and Cybersecurity, and Workforce of the Future. Section 2.3 provides a more detailed overview of these domains.

  12. Tidd PFBC Demonstration Project, A DOE Assessment

    SciTech Connect

    National Energy Technology Laboratory

    2001-08-31

    The Clean Coal Technology (CCT) Demonstration Program is a government and industry co-funded technology development effort to demonstrate a new generation of innovative coal utilization processes. One goal of the program is to furnish the energy marketplace with a variety of energy efficient, environmentally superior coal-based technologies. Demonstration projects seek to establish the commercial feasibility of the most promising coal technologies that have proceeded beyond the proof-of-concept stage. This report is a post-project assessment of the DOE CCT Demonstration Program, the Tidd PFBC Demonstration Project. A major objective of the CCT Program is to provide the technical data necessary for the private sector to proceed confidently with the commercial replication of the demonstrated technologies. An essential element of meeting this goal is the dissemination of results from the demonstration projects. This post-project assessment (PPA) report is an independent DOE appraisal of the successes that the completed project had in achieving its objectives and aiding in the commercialization of the demonstrated technology. The report also provides an assessment of the expected technical, environmental, and economic performance of the commercial version of the technology, as well as an analysis of the commercial market.

  13. Using a Project Portfolio: Empowerment Evaluation for Model Demonstration Projects.

    ERIC Educational Resources Information Center

    Baggett, David

    For model postsecondary demonstration projects serving individuals with disabilities, a portfolio of project activities may serve as a method for program evaluation, program replication, and program planning. Using a portfolio for collecting, describing, and documenting a project's successes, efforts, and failures enables project staff to take…

  14. 76 FR 82286 - Applications for New Awards; Disability and Rehabilitation Research Projects and Centers Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-30

    ... Applications for New Awards; Disability and Rehabilitation Research Projects and Centers Program--Advanced Rehabilitation Research Training (ARRT) Projects AGENCY: Office of Special Education and Rehabilitative Services... Rehabilitation Research Training (ARRT) Projects. Notice inviting applications for new awards for fiscal year...

  15. 34 CFR 369.1 - What are the Vocational Rehabilitation Service Projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What are the Vocational Rehabilitation Service Projects... REHABILITATION SERVICE PROJECTS General § 369.1 What are the Vocational Rehabilitation Service Projects? (a... vocational rehabilitation services and related services to individuals with disabilities and other...

  16. 34 CFR 350.1 - What is the Disability and Rehabilitation Research Projects and Centers Program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Rehabilitation Research and Related Projects: (1) Disability and Rehabilitation Research Projects. (2) Field... 34 Education 2 2010-07-01 2010-07-01 false What is the Disability and Rehabilitation Research... DISABILITY AND REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM General § 350.1 What is the...

  17. 34 CFR 350.1 - What is the Disability and Rehabilitation Research Projects and Centers Program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Rehabilitation Research and Related Projects: (1) Disability and Rehabilitation Research Projects. (2) Field... 34 Education 2 2011-07-01 2010-07-01 true What is the Disability and Rehabilitation Research... DISABILITY AND REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM General § 350.1 What is the...

  18. X-43C Flight Demonstrator Project Overview

    NASA Technical Reports Server (NTRS)

    Moses, Paul L.

    2003-01-01

    The X-43C Flight Demonstrator Project is a joint NASA-USAF hypersonic propulsion technology flight demonstration project that will expand the hypersonic flight envelope for air-breathing engines. The Project will demonstrate sustained accelerating flight through three flights of expendable X-43C Demonstrator Vehicles (DVs). The approximately 16-foot long X-43C DV will be boosted to the starting test conditions, separate from the booster, and accelerate from Mach 5 to Mach 7 under its own power and autonomous control. The DVs will be powered by a liquid hydrocarbon-fueled, fuel-cooled, dual-mode, airframe integrated scramjet engine system developed under the USAF HyTech Program. The Project is managed by NASA Langley Research Center as part of NASA's Next Generation Launch Technology Program. Flight tests will be conducted by NASA Dryden Flight Research Center off the coast of California over water in the Pacific Test Range. The NASA/USAF/industry project is a natural extension of the Hyper-X Program (X-43A), which will demonstrate short duration (approximately 10 seconds) gaseous hydrogen-fueled scramjet powered flight at Mach 7 and Mach 10 using a heavy-weight, largely heat sink construction, experimental engine. The X-43C Project will demonstrate sustained accelerating flight from Mach 5 to Mach 7 (approximately 4 minutes) using a flight-weight, fuel-cooled, scramjet engine powered by much denser liquid hydrocarbon fuel. The X-43C DV design flows from integrating USAF HyTech developed engine technologies with a NASA Air-Breathing Launch Vehicle accelerator-class configuration and Hyper-X heritage vehicle systems designs. This paper describes the X-43C Project and provides the background for NASA's current hypersonic flight demonstration efforts.

  19. Freihoelser Forst Local Training Area Demonstration Project: Prescription development and installation

    SciTech Connect

    Hinchman, R.R.; Zellmer, S.D.; Severinghaus, W.D.; Brent, J.J.

    1989-04-01

    The Freiholser Forst Local Training Area (LTA) Rehabilitation Demonstration Project is part of the Integrated Training Area Management program being developed by the US Army Corps of Engineers` Construction Engineering Research Laboratory for the Seventh Army Training Command of the US Army in Europe. The rehabilitation demonstration project was begun in 1987 to develop and demonstrate rapid, cost-effective methods to stabilize the LTA`s barren, eroding maneuver areas and make training conditions more realistic. The sandy, infertile, and acidic soils at the LTA are considered the major factor limiting rehabilitation efforts there. The project involves the evaluation of three procedures to revegetate the soils, each incorporating identical methods for preparing the seedbed and a single seed mixture consisting of adapted, native species but using different soil amendments. All three treatments have satisfactorily reestablished vegetation and controlled erosion on the demonstration plots at the LTA, but their costs have varied widely.

  20. Freihoelser Forst Local Training Area Demonstration Project: Prescription development and installation

    SciTech Connect

    Hinchman, R.R.; Zellmer, S.D. . Energy Systems Div.); Severinghaus, W.D. ); Brent, J.J. )

    1989-04-01

    The Freiholser Forst Local Training Area (LTA) Rehabilitation Demonstration Project is part of the Integrated Training Area Management program being developed by the US Army Corps of Engineers' Construction Engineering Research Laboratory for the Seventh Army Training Command of the US Army in Europe. The rehabilitation demonstration project was begun in 1987 to develop and demonstrate rapid, cost-effective methods to stabilize the LTA's barren, eroding maneuver areas and make training conditions more realistic. The sandy, infertile, and acidic soils at the LTA are considered the major factor limiting rehabilitation efforts there. The project involves the evaluation of three procedures to revegetate the soils, each incorporating identical methods for preparing the seedbed and a single seed mixture consisting of adapted, native species but using different soil amendments. All three treatments have satisfactorily reestablished vegetation and controlled erosion on the demonstration plots at the LTA, but their costs have varied widely.

  1. Final priority; National Institute on Disability and Rehabilitation Research--Disability and Rehabilitation Research Projects and Centers Program. Final priority.

    PubMed

    2014-07-25

    The Assistant Secretary for Special Education and Rehabilitative Services announces a priority under the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR). Specifically, we announce a priority for a Disability and Rehabilitation Research Project (DRRP) on Improving Methods of Evaluating Return on Investment (ROI) for the State Vocational Rehabilitation Services Program (VR Program). The Assistant Secretary may use this priority for competitions in fiscal year (FY) 2014 and later years. We take this action to focus research attention on an area of national need. We intend for the priority to contribute to improved employment outcomes for individuals with disabilities.

  2. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    Albert Calderon

    1998-12-23

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (1) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (2) providing proof that such process is continuous and environmentally closed to prevent emissions; (3) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (4) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Conducting bench-scale tests to produce coke and acceptable tar from the process to satisfy Koppers, a prospective stakeholder; Consolidation of the project team players to execute the full size commercial cokemaking reactor demonstration; and Progress made in advancing the design of the full size commercial cokemaking reactor.

  3. Yaqui Parent Education Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    de Campoy, Antonia

    The Yaqui Parent Education Demonstration Project was founded in 1975 with the aid of Maricopa County Head Start in Guadalupe, Arizona, to help foster the continuation of the Yaqui language, history, and culture. With a 1-year grant from the Department of Health, Education, and Welfare/Office of Child Development, organizers hired a coordinator,…

  4. A Rural Citizens Health Promotion Demonstration Project.

    ERIC Educational Resources Information Center

    Sutherland, Mary; And Others

    1989-01-01

    This article describes a health promotion demonstration project which addressed the health problem of hypertension, as related to variables of excercise, weight, blood pressure measurement and reduction, medication compliance, and nutritional practices. Participants (N=18) were senior citizens who were associated with a small, rural, predominantly…

  5. Designing Synchronous Distance Education: A Demonstration Project.

    ERIC Educational Resources Information Center

    Koszalka, Tiffany A.

    2001-01-01

    Reports on the design and formative assessment of a synchronous distance education demonstration project designed to bring experts to participants at their work locations through Internet technologies. Following evaluation results, a more robust model was designed to increase interactivity before, during, and after the live-broadcast training…

  6. The Habitat Demonstration Unit Project Overview

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.; Grill, Tracy R.; Tri, Terry O.; Howe, Alan S.

    2010-01-01

    This paper will describe an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) Project. The HDU project is a "technology-pull" project that integrates technologies and innovations from numerous NASA centers. This project will be used to investigate and validate surface architectures, operations concepts, and requirements definition of various habitation concepts. The first habitation configuration this project will build and test is the Pressurized Excursion Module (PEM). This habitat configuration - the PEM - is based on the Constellation Architecture Scenario 12.1 concept of a vertically oriented habitat module. The HDU project will be tested as part of the 2010 Desert Research and Technologies Simulations (D-RATS) test objectives. The purpose of this project is to develop, integrate, test, and evaluate a habitat configuration in the context of the mission architectures and surface operation concepts. A multi-center approach will be leveraged to build, integrate, and test the PEM through a shared collaborative effort of multiple NASA centers. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Lunar Surface Systems Project Office (LSSPO) to test surface elements in a surface analog environment. The 2010 analog field test will include two Lunar Electric Rovers (LER) and the PEM among other surface demonstration elements. This paper will describe the overall objectives, its various habitat configurations, strategic plan, and technology integration as it pertains to the 2010 and 2011 field analog tests. To accomplish the development of the PEM from conception in June 2009 to rollout for operations in July 2010, the HDU project team is using a set of design standards to define the interfaces between the various systems of PEM and to the payloads, such as the Geology Lab, that those systems will support

  7. Session 9: Heber Geothermal Binary Demonstration Project

    SciTech Connect

    Allen, Richard F.; Nelson, Tiffany T.

    1983-12-01

    The Heber Binary Project had its beginning in studies performed for the Electric Power Research Institute (EPRI), which identified the need for commercial scale (50 Mw or larger) demonstration of the binary cycle technology. In late 1980, SDG&E and the Department of Energy (DOE) signed a Cooperative Agreement calling for DOE to share in 50 percent of the Project costs. Similarly, SDG&E signed Project participation agreements with EPRI, the Imperial Irrigation District, California Department of Water Resources, and Southern California Edison Company, which provided the remaining 50 percent of the required funding. In 1982, the State of California also joined the Project. The objectives of the Heber Binary Project are to demonstrate the potential of moderate-temperature (below 410 F) geothermal energy to produce economic electric power with binary cycle conversion technology, and to establish schedule, cost and equipment performance, reservoir performance, and the environmental acceptability of such plants. The plant will be the first large-scale power generating facility in the world utilizing the binary conversion process, and it is expected that information resulting from this Project will be applicable to a wide range of moderate-temperature hydrothermal reservoirs, which represent 80 percent of geothermal resources in the United States. To accomplish the plant engineering, design, and equipment procurement, SDG&E has hired Fluor Engineers, Inc., Power Division, of Irvine, California. In early 1982, SDG&E contracted for construction management services with Dravo Constructors, Inc. (DCI) of New York. DCI is responsible for casting the Fluor design into construction packages, letting the construction contracts, and overseeing the construction in the field.

  8. Advanced Coal Conversion Process Demonstration Project

    SciTech Connect

    Not Available

    1992-04-01

    Western Energy Company (WECO) was selected by the Department of Energy (DOE) to demonstrate the Advanced Coal Conversion Process (ACCP) which upgrades low rank coals into high Btu, low sulfur, synthetic bituminous coal. As specified in the Corporate Agreement, RSCP is required to develop an Environmental Monitoring Plan (EMP) which describes in detail the environmental monitoring activities to be performed during the project execution. The purpose of the EMP is to: (1) identify monitoring activities that will be undertaken to show compliance to applicable regulations, (2) confirm the specific environmental impacts predicted in the National Environmental Policy Act documentation, and (3) establish an information base of the assessment of the environmental performance of the technology demonstrated by the project. The EMP specifies the streams to be monitored (e.g. gaseous, aqueous, and solid waste), the parameters to be measured (e.g. temperature, pressure, flow rate), and the species to be analyzed (e.g. sulfur compounds, nitrogen compounds, trace elements) as well as human health and safety exposure levels. The operation and frequency of the monitoring activities is specified, as well as the timing for the monitoring activities related to project phase (e.g. preconstruction, construction, commissioning, operational, post-operational). The EMP is designed to assess the environmental impacts and the environmental improvements resulting from construction and operation of the project.

  9. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    Albert Calderon

    1999-09-22

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (1) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (2) providing proof that such process is continuous and environmentally closed to prevent emissions; (3) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; (4) conducting a blast furnace test to demonstrate the compatibility of the coke produced; and (5) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Detailed workings of the team; Proposal to FETC for Phase II; Permitting and Environmental Work; and Engineering Progress.

  10. Real-Time Ada Demonstration Project

    DTIC Science & Technology

    1989-05-31

    CENER OR OFTAREENGINEERING ADVANCED SOFTWARE TECHNOLOGY Subject: Final Report - Real-Time Ada Demonstration Proj e-t- --.-. SEP 0 1989 D SEA)~ CIN...C02 0921I 6))00 I 31 MAY 1989 *:i ’C O~ 0"ed ~ 842 190 ?’ 45 DEMONSTRATION PROJECT FINAL REPORT PREPARED FOR: U.S. Army HQ CECOM Center for Software ...Engineering Advanced Software Technology Fort Monmouth, NJ 07703-5000 Accession For NTIS G1A&I DTIC TAB PREPARED BY: unannou:1r2d E LabTek Corporation

  11. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project

    SciTech Connect

    Not Available

    1992-02-01

    The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

  12. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    ALBERT CALDERON

    1996-06-21

    This project deals with the demonstration of a full size commercial coking retort using Calderon's novel process for making metallurgical coke. Tests are currently being conducted on a heat resistant alloy by subjecting such alloy to raw gases from an actual operating coke oven at LTV Steel's coke plant in Warren, Ohio to determine the effects of sulfurous gases on the alloy before ordering 232,000 lbs of this alloy for the full size commercial coking retort. Design engineering is proceeding.

  13. Baltimore residential assistance demonstration project: Final report

    SciTech Connect

    1998-09-01

    At the request of the City of Baltimore for assistance in developing the Global Action Plan (GAP) EcoTeam Program, DOE Office of Energy Efficiency and Renewable Energy provided GAP with $10,000 for a one-year demonstration project. The results of this action are as follows: four EcoTeams were established representing 28 households and 47 people; the self reported resource savings to date per household are on average: energy savings--9%, auto emission reduction--16%, solid waste reduction--52%, water savings--25%, dollar savings--$174; the initial seed team (prior to this funding) replicated and started 2 new teams, one of those teams replicated and started 2 more teams, the other team did not replicate; 4 volunteer coaches were recruited to coach each of these teams; a volunteer coordinator was recruited to provide local guidance for this demonstration project and help GAP reach out to the Fairfield low-income neighborhood, the volunteer coordinator was unable to establish any EcoTeams in this neighborhood as their priorities were establishing a neighborhood action team and addressing immediate health-related environmental issues; the volunteers have communicated information about this demonstration project among many community and Baltimore government leaders to solicit support for a full campaign and to assess the level of that support.

  14. Southern Nevada Alternative Fuels Demonstration Project

    SciTech Connect

    Hyde, Dan; Fast, Matthew

    2009-12-31

    The Southern Nevada Alternative Fuels Program is designed to demonstrate, in a day-to-day bus operation, the reliability and efficiency of a hydrogen bus operation under extreme conditions. By using ICE technology and utilizing a virtually emission free fuel, benefits to be derived include air quality enhancement and vehicle performance improvements from domestically produced, renewable energy sources. The project objective is to help both Ford and the City demonstrate and evaluate the performance characteristics of the E-450 H2ICE shuttle buses developed by Ford, which use a 6.8-liter supercharged Triton V-10 engine with a hydrogen storage system equivalent to 29 gallons of gasoline. The technology used during the demonstration project in the Ford buses is a modified internal combustion engine that allows the vehicles to run on 100% hydrogen fuel. Hydrogen gives a more thorough fuel burn which results in more power and responsiveness and less pollution. The resultant emissions from the tailpipe are 2010 Phase II compliant with NO after treatment. The City will lease two of these E-450 H2ICE buses from Ford for two years. The buses are outfitted with additional equipment used to gather information needed for the evaluation. Performance, reliability, safety, efficiency, and rider comments data will be collected. The method of data collection will be both electronically and manually. Emissions readings were not obtained during the project. The City planned to measure the vehicle exhaust with an emissions analyzer machine but discovered the bus emission levels were below the capability of their machine. Passenger comments were solicited on the survey cards. The majority of comments were favorable. The controllable issues encountered during this demonstration project were mainly due to the size of the hydrogen fuel tanks at the site and the amount of fuel that could be dispensed during a specified period of time. The uncontrollable issues encountered during this

  15. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    Albert Calderon

    1999-03-19

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (1) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (2) providing proof that such process is continuous and environmentally closed to prevent emissions; (3) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (4) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Consolidation of the team of stakeholders; Move the site for the commercial demonstration to LTV Steel, Cleveland, Ohio; Permitting for new site; Site specific engineering; Cost update of the project as it relates to the Cleveland location; FETC update; DCAA audit; and Updated endorsement of Calderon process by Ohio EPA and U.S. EPA, Region 5.

  16. Wildlife habitat evaluation demonstration project. [Michigan

    NASA Technical Reports Server (NTRS)

    Burgoyne, G. E., Jr.; Visser, L. G.

    1981-01-01

    To support the deer range improvement project in Michigan, the capability of LANDSAT data in assessing deer habitat in terms of areas and mixes of species and age classes of vegetation is being examined to determine whether such data could substitute for traditional cover type information sources. A second goal of the demonstration project is to determine whether LANDSAT data can be used to supplement and improve the information normally used for making deer habitat management decisions, either by providing vegetative cover for private land or by providing information about the interspersion and juxtaposition of valuable vegetative cover types. The procedure to be used for evaluating in LANDSAT data of the Lake County test site is described.

  17. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    ALBERT CALDERON

    1998-09-22

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (i) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (ii) providing proof that such process is continuous and environmentally closed to prevent emissions; (iii) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (iv) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: � Consolidation of the project team-players; � Recruiting Koppers Industries as an additional stakeholder; � Developing a closed system for the production of binder pitch from tar in the Calderon coking process as the incentive for Koppers to join the team; � Gathering appropriate equipment for conducting a set of experiments at bench scale to simulate tar quality produced from the Calderon coking process for the production of binder pitch; and � Further progress made in the design of the commercial coking reactor.

  18. Secure Interoperable Open Smart Grid Demonstration Project

    SciTech Connect

    Magee, Thoman

    2014-12-28

    The Consolidated Edison, Inc., of New York (Con Edison) Secure Interoperable Open Smart Grid Demonstration Project (SGDP), sponsored by the United States (US) Department of Energy (DOE), demonstrated that the reliability, efficiency, and flexibility of the grid can be improved through a combination of enhanced monitoring and control capabilities using systems and resources that interoperate within a secure services framework. The project demonstrated the capability to shift, balance, and reduce load where and when needed in response to system contingencies or emergencies by leveraging controllable field assets. The range of field assets includes curtailable customer loads, distributed generation (DG), battery storage, electric vehicle (EV) charging stations, building management systems (BMS), home area networks (HANs), high-voltage monitoring, and advanced metering infrastructure (AMI). The SGDP enables the seamless integration and control of these field assets through a common, cyber-secure, interoperable control platform, which integrates a number of existing legacy control and data systems, as well as new smart grid (SG) systems and applications. By integrating advanced technologies for monitoring and control, the SGDP helps target and reduce peak load growth, improves the reliability and efficiency of Con Edison’s grid, and increases the ability to accommodate the growing use of distributed resources. Con Edison is dedicated to lowering costs, improving reliability and customer service, and reducing its impact on the environment for its customers. These objectives also align with the policy objectives of New York State as a whole. To help meet these objectives, Con Edison’s long-term vision for the distribution grid relies on the successful integration and control of a growing penetration of distributed resources, including demand response (DR) resources, battery storage units, and DG. For example, Con Edison is expecting significant long-term growth of DG

  19. Nucla circulating atmospheric fluidized bed demonstration project

    SciTech Connect

    Keith, Raymond E.

    1991-10-01

    Colorado-Ute Electric Association began a study to evaluate options for upgrading and extending the life of its Nucla power station in 1982. Located in southwestern Colorado near the town of Nucla, this station was commissioned in 1959 with a local bituminous coal as its design fuel for three identical stoker-fired units, each rated at 12.6 MW(e). Poor station efficiency, high fuel costs, and spiraling boiler maintenance costs forced the Nucla Station into low priority in the CUEA dispatch order as early as 1981. Among the options CUEA considered was to serve as a host utility to demonstrate Atmospheric Fluidized Bed Combustion (AFBC) technology. The anticipated environmental benefits and apparent attractive economics of a circulating AFBC led to Colorado-Ute's decision to proceed with the design and construction of a demonstration project in 1984 at the Nucla facility.

  20. Illinois drainage water management demonstration project

    USGS Publications Warehouse

    Pitts, D.J.; Cooke, R.; Terrio, P.J.; ,

    2004-01-01

    Due to naturally high water tables and flat topography, there are approximately 4 million ha (10 million ac) of farmland artificially drained with subsurface (tile) systems in Illinois. Subsurface drainage is practiced to insure trafficable field conditions for farm equipment and to reduce crop stress from excess water within the root zone. Although drainage is essential for economic crop production, there have been some significant environmental costs. Tile drainage systems tend to intercept nutrient (nitrate) rich soil-water and shunt it to surface water. Data from numerous monitoring studies have shown that a significant amount of the total nitrate load in Illinois is being delivered to surface water from tile drainage systems. In Illinois, these drainage systems are typically installed without control mechanisms and allow the soil to drain whenever the water table is above the elevation of the tile outlet. An assessment of water quality in the tile drained areas of Illinois showed that approximately 50 percent of the nitrate load was being delivered through the tile systems during the fallow period when there was no production need for drainage to occur. In 1998, a demonstration project to introduce drainage water management to producers in Illinois was initiated by NRCS4 An initial aspect of the project was to identify producers that were willing to manage their drainage system to create a raised water table during the fallow (November-March) period. Financial assistance from two federal programs was used to assist producers in retrofitting the existing drainage systems with control structures. Growers were also provided guidance on the management of the structures for both water quality and production benefits. Some of the retrofitted systems were monitored to determine the effect of the practice on water quality. This paper provides background on the water quality impacts of tile drainage in Illinois, the status of the demonstration project, preliminary

  1. Education & Collection Facility GSHP Demonstration Project

    SciTech Connect

    Joplin, Jeff

    2015-03-28

    The Denver Museum of Nature & Science (DMNS) designed and implemented an innovative ground source heat pump (GSHP) system for heating and cooling its new Education and Collection Facility (ECF) building addition. The project goal was to successfully design and install an open-loop GSHP system that utilized water circulating within an underground municipal recycled (non-potable) water system as the heat sink/source as a demonstration project. The expected results were to significantly reduce traditional GSHP installation costs while increasing system efficiency, reduce building energy consumption, require significantly less area and capital to install, and be economically implemented wherever access to a recycled water system is available. The project added to the understanding of GSHP technology by implementing the first GSHP system in the United States utilizing a municipal recycled water system as a heat sink/source. The use of this fluid through a GSHP system has not been previously documented. This use application presents a new opportunity for local municipalities to develop and expand the use of underground municipal recycled (non-potable) water systems. The installation costs for this type of technology in the building structure would be a cost savings over traditional GSHP costs, provided the local municipal infrastructure was developed. Additionally, the GSHP system functions as a viable method of heat sink/source as the thermal characteristics of the fluid are generally consistent throughout the year and are efficiently exchanged through the GSHP system and its components. The use of the recycled water system reduces the area required for bore or loop fields; therefore, presenting an application for building structures that have little to no available land use or access. This GSHP application demonstrates the viability of underground municipal recycled (non-potable) water systems as technically achievable, environmentally supportive, and an efficient

  2. 77 FR 34359 - Applications for New Awards: Disability and Rehabilitation Research Projects and Centers Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... Brain Injury Model Systems Centers AGENCY: Office of Special Education and Rehabilitative Services... and Rehabilitation Research Projects (DRRPs)-- Traumatic Brain Injury Model Systems Centers (TBIMS... Brain Injury Model Systems Centers priority is from the notice of final priority for this...

  3. 76 FR 32971 - Proposed Priority for the Disability and Rehabilitation Research Projects and Centers Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-07

    ... and Rehabilitation Research Project (DRRP)--Center on Knowledge Translation for Disability and... notice proposes a priority for a center on knowledge translation for disability and rehabilitation... This notice contains one proposed priority. Center on Knowledge Translation for Disability...

  4. 34 CFR 359.1 - What is the Special Projects and Demonstrations for Spinal Cord Injuries Program?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Spinal Cord Injuries Program? 359.1 Section 359.1 Education Regulations of the Offices of the Department... EDUCATION DISABILITY AND REHABILITATION RESEARCH: SPECIAL PROJECTS AND DEMONSTRATIONS FOR SPINAL CORD INJURIES General § 359.1 What is the Special Projects and Demonstrations for Spinal Cord Injuries...

  5. 34 CFR 359.1 - What is the Special Projects and Demonstrations for Spinal Cord Injuries Program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Spinal Cord Injuries Program? 359.1 Section 359.1 Education Regulations of the Offices of the Department... EDUCATION DISABILITY AND REHABILITATION RESEARCH: SPECIAL PROJECTS AND DEMONSTRATIONS FOR SPINAL CORD INJURIES General § 359.1 What is the Special Projects and Demonstrations for Spinal Cord Injuries...

  6. 34 CFR 359.1 - What is the Special Projects and Demonstrations for Spinal Cord Injuries Program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Spinal Cord Injuries Program? 359.1 Section 359.1 Education Regulations of the Offices of the Department... EDUCATION DISABILITY AND REHABILITATION RESEARCH: SPECIAL PROJECTS AND DEMONSTRATIONS FOR SPINAL CORD INJURIES General § 359.1 What is the Special Projects and Demonstrations for Spinal Cord Injuries...

  7. Wave Power Demonstration Project at Reedsport, Oregon

    SciTech Connect

    Mekhiche, Mike; Downie, Bruce

    2013-10-21

    Ocean wave power can be a significant source of large‐scale, renewable energy for the US electrical grid. The Electrical Power Research Institute (EPRI) conservatively estimated that 20% of all US electricity could be generated by wave energy. Ocean Power Technologies, Inc. (OPT), with funding from private sources and the US Navy, developed the PowerBuoy to generate renewable energy from the readily available power in ocean waves. OPT's PowerBuoy converts the energy in ocean waves to electricity using the rise and fall of waves to move the buoy up and down (mechanical stroking) which drives an electric generator. This electricity is then conditioned and transmitted ashore as high‐voltage power via underwater cable. OPT's wave power generation system includes sophisticated techniques to automatically tune the system for efficient conversion of random wave energy into low cost green electricity, for disconnecting the system in large waves for hardware safety and protection, and for automatically restoring operation when wave conditions normalize. As the first utility scale wave power project in the US, the Wave Power Demonstration Project at Reedsport, OR, will consist of 10 PowerBuoys located 2.5 miles off the coast. This U.S. Department of Energy Grant funding along with funding from PNGC Power, an Oregon‐based electric power cooperative, was utilized for the design completion, fabrication, assembly and factory testing of the first PowerBuoy for the Reedsport project. At this time, the design and fabrication of this first PowerBuoy and factory testing of the power take‐off subsystem are complete; additionally the power take‐off subsystem has been successfully integrated into the spar.

  8. Medium Duty Electric Vehicle Demonstration Project

    SciTech Connect

    Mackie, Robin J. D.

    2015-05-31

    The Smith Electric Vehicle Demonstration Project (SDP) was integral to the Smith business plan to establish a manufacturing base in the United States (US) and produce a portfolio of All Electric Vehicles (AEV’s) for the medium duty commercial truck market. Smith focused on the commercial depot based logistics market, as it represented the market that was most ready for the early adoption of AEV technology. The SDP enabled Smith to accelerate its introduction of vehicles and increase the size of its US supply chain to support early market adoption of AEV’s that were cost competitive, fully met the needs of a diverse set of end users and were compliant with Federal safety and emissions requirements. The SDP accelerated the development and production of various electric drive vehicle systems to substantially reduce petroleum consumption, reduce vehicular emissions of greenhouse gases (GHG), and increase US jobs.

  9. Controlled Hydrogen Fleet and Infrastructure Demonstration Project

    SciTech Connect

    Dr. Scott Staley

    2010-03-31

    This program was undertaken in response to the US Department of Energy Solicitation DE-PS30-03GO93010, resulting in this Cooperative Agreement with the Ford Motor Company and BP to demonstrate and evaluate hydrogen fuel cell vehicles and required fueling infrastructure. Ford initially placed 18 hydrogen fuel cell vehicles (FCV) in three geographic regions of the US (Sacramento, CA; Orlando, FL; and southeast Michigan). Subsequently, 8 advanced technology vehicles were developed and evaluated by the Ford engineering team in Michigan. BP is Ford's principal partner and co-applicant on this project and provided the hydrogen infrastructure to support the fuel cell vehicles. BP ultimately provided three new fueling stations. The Ford-BP program consists of two overlapping phases. The deliverables of this project, combined with those of other industry consortia, are to be used to provide critical input to hydrogen economy commercialization decisions by 2015. The program's goal is to support industry efforts of the US President's Hydrogen Fuel Initiative in developing a path to a hydrogen economy. This program was designed to seek complete systems solutions to address hydrogen infrastructure and vehicle development, and possible synergies between hydrogen fuel electricity generation and transportation applications. This project, in support of that national goal, was designed to gain real world experience with Hydrogen powered Fuel Cell Vehicles (H2FCV) 'on the road' used in everyday activities, and further, to begin the development of the required supporting H2 infrastructure. Implementation of a new hydrogen vehicle technology is, as expected, complex because of the need for parallel introduction of a viable, available fuel delivery system and sufficient numbers of vehicles to buy fuel to justify expansion of the fueling infrastructure. Viability of the fuel structure means widespread, affordable hydrogen which can return a reasonable profit to the fuel provider, while

  10. LIFAC Sorbent Injection Desulfurization Demonstration Project

    SciTech Connect

    Not Available

    1992-01-01

    Sorbent injection is a potentially important alternative to conventional wet lime and limestone scrubbing, and this project is another effort to test alternative sorbent injection approaches. In comparison to wet systems, LIFAC, with recirculation of the sorbent, removes less sulfur dioxide - 75--85% relative to 90% or greater for conventional scrubbers -- and requires more reagent material. However, if the demonstration is wet scrubbing systems: LIFAC is relatively easy to retrofit to an existing boiler and requires less area than conventional wet FGD systems. LIFAC is less expensive to install than conventional wet FGD processes. LIFAC's overall costs measured on a dollar-per-ton SO[sub 2] removed basis are less, an important advantage in a regulatory regime with trading of emission allocations. LIFAC produces a dry, readily disposable waste by-product versus a wet product. LIFAC is relatively simple to operate.

  11. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    ALBERT CALDERON

    1996-09-17

    This project which deals with the demonstration of a full size commercial coking retort using Calderon's proprietary technology for making metallurgical coke ran into a commercialization problem by virtue that the designed retort for two (2) tons of coke/hour necessitates thirty-two (32) retorts to produce the 500,000 tons of coke per year for a commercial plant. Bechtel Mining and Metals prepared a cost estimate of the commercial plant which indicated the commercial plant would not be economically feasible. The activity during this reporting period was directed to making changes to the design of the coking retort in order to reduce the number of retorts required for a 500,000 ton/year commercial coke facility. The result of this activity resulted in the drastic reduction of the number of retorts to eight (8) with each retort projected to produce 8.17 tons of coke/hour. Such decrease in number of retorts makes the Calderon technology quite competitive and therefore commercially feasible.

  12. MODIL cryocooler producibility demonstration project results

    SciTech Connect

    Cruz, G.E.; Franks, R.M.

    1993-06-24

    The production of large quantities of spacecraft needed by SDIO will require a cultural change in design and production practices. Low rates production and the need for exceedingly high reliability has driven the industry to custom designed, hand crafted, and exhaustingly tested satellites. These factors have mitigated against employing design and manufacturing cost reduction methods commonly used in tactical missile production. Additional challenges to achieving production efficiencies are presented by the SDI spacecraft mission requirement. IR sensor systems, for example, are comprised of subassemblies and components that require the design, manufacture, and maintenance of ultra precision tolerances over challenging operational lifetimes. These IR sensors demand the use of reliable, closed loop, cryogenic refrigerators or active cryocoolers to meet stringent system acquisition and pointing requirements. The authors summarize some spacecraft cryocooler requirements and discuss their observations regarding Industry`s current production capabilities of cryocoolers. The results of the Lawrence Livermore National Laboratory (LLNL) Spacecraft Fabrication and Test (SF and T) MODIL`s Phase I producibility demonstration project are presented. The current project that involves LLNL and industrial participants is discussed.

  13. Environmental audit: West Valley Demonstration Project

    SciTech Connect

    Not Available

    1992-01-01

    This report documents the results of the Environmental Audit of West Valley Demonstration Project (WVDP) located in West Valley, New York. The WVDP Environmental Audit was conducted from July 29 through August 16, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at WVDP as well as the overall environmental management system. The scope of the Environmental Audit was comprehensive, addressing environmental media and Federal, state, and local regulations, with the exception of the National Environmental Policy Act (NEPA). Also addressed were DOE Orders, WVDP 1989 ES&H Assessment Action Plan, formalized facility or program operating procedures, and BMPS. The technical disciplines addressed by the Audit were: Air; Surface Water; Soils, Sediment and Biota; Groundwater; Waste Management; Toxic and Chemical Materials; Radiation; Quality Assurance; and Inactive Waste Sites. In addition, the Audit included a review of environmental management programs within the West Valley Project Office (WVPO). West Valley Nuclear Services (WVNS), and Subcontractor organizations. The effectiveness of environmental monitoring programs was a major component of the review conducted within each technical discipline.

  14. Environmental audit: West Valley Demonstration Project

    SciTech Connect

    Not Available

    1992-01-01

    This report documents the results of the Environmental Audit of West Valley Demonstration Project (WVDP) located in West Valley, New York. The WVDP Environmental Audit was conducted from July 29 through August 16, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at WVDP as well as the overall environmental management system. The scope of the Environmental Audit was comprehensive, addressing environmental media and Federal, state, and local regulations, with the exception of the National Environmental Policy Act (NEPA). Also addressed were DOE Orders, WVDP 1989 ES H Assessment Action Plan, formalized facility or program operating procedures, and BMPS. The technical disciplines addressed by the Audit were: Air; Surface Water; Soils, Sediment and Biota; Groundwater; Waste Management; Toxic and Chemical Materials; Radiation; Quality Assurance; and Inactive Waste Sites. In addition, the Audit included a review of environmental management programs within the West Valley Project Office (WVPO). West Valley Nuclear Services (WVNS), and Subcontractor organizations. The effectiveness of environmental monitoring programs was a major component of the review conducted within each technical discipline.

  15. Three-stage combustion demonstration projects update

    SciTech Connect

    Ashworth, B.; Zawadzki, E.; Murrell, F.; Shroyer, D.; Gallenbach, T.

    2000-07-01

    The Ashworth Combustor is a pulverized coal-fired system that reduces the three major air pollutants (NO{sub x}, SO{sub 2} and particulate) associated with coal combustion. A 50 million Btu/hr combustion system will be retrofitted to a stoker boiler at the Lincoln Development Center in Lincoln, Illinois. Startup and testing re scheduled for mid 2000. With this technology, a two-stage slagging combustor is used with furnace over-fire air (the third stage). Pulverized coal/limestone are fired/calcined in the combustor. limestone (lime) is added to flux the slag and capture sulfur in a molten slag eutectic as a non-leaching calcium sulfide. Beside deep NO{sub x} reduction, 70%+SO{sub 2} and 70 to 80% particulate reductions are projected for the Ashworth Combustor. ClearStack, the Illinois Department of Commerce and Community Affairs Office of Coal Development and Marketing and the Ohio Coal Development Office (OCDO) are sponsoring the Ashworth Combustor demonstration. The Stage3Cyclone is a simple retrofit to cyclone-fired boilers to reduce NO{sub x} emissions to low levels. The existing cyclone barrels are used as the first stage of combustion and the conventional cyclone feed coal size (-1/4 inch) is used. Limestone is added to flux the coal ash. Second stage air is added in the furnace at the re-entrant throat level followed by over-fire air (OFA) injection in the upper part of the furnace. The technique is to be demonstrated on a southern Illinois Power Cooperative 33 MWe cyclone-fired unit in Marion, Illinois. Funding arrangements are being made and testing is projected for late 2000.

  16. Learning to design rehabilitation devices through the H-CARD course: project-based learning of rehabilitation technology design.

    PubMed

    Roach, Nick; Hussain, Asif; Burdet, Etienne

    2012-01-01

    The aging population and the wish to improve quality of life, as well as the economic pressure to work longer, call for intuitive and efficient assistive and rehabilitation technologies. Therefore, we have developed a project based education paradigm in the design of assistive and rehabilitation devices. Using a miniature wireless sensing and feedback platform, the multimodal interactive motor assessment and training environment (MIMATE), students from different engineering backgrounds were able to develop innovative devices implementing rehabilitative games in the short span of a one-term course. We describe here this novel H-CARD course on the human-centered design of assistive and rehabilitative devices.

  17. Rehabilitation

    MedlinePlus

    ... doing things you did before. This process is rehabilitation. Rehabilitation often focuses on Physical therapy to help your ... who has had a stroke may simply want rehabilitation to be able to dress or bathe without ...

  18. PFBC Utility Demonstration Project. Annual report, 1991

    SciTech Connect

    Not Available

    1992-11-01

    This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 & 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP`s proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

  19. Exploration Medical System Demonstration (EMSD) Project

    NASA Technical Reports Server (NTRS)

    Chin, Duane

    2012-01-01

    The Exploration Medical System Demonstration (EMSD) is a project under the Exploration Medical Capability (ExMC) element managed by the Human Research Program (HRP). The vision for the EMSD is to utilize ISS as a test bed to show that several medical technologies needed for an exploration mission and medical informatics tools for managing evidence and decision making can be integrated into a single system and used by the on-orbit crew in an efficient and meaningful manner. Objectives: a) Reduce and even possibly eliminate the time required for on-orbit crew and ground personnel (which include Surgeon, Biomedical Engineer (BME) Flight Controller, and Medical Operations Data Specialist) to access and move medical data from one application to another. b) Demonstrate that the on-orbit crew has the ability to access medical data/information using an intuitive and crew-friendly software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management framework and architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities.

  20. Brown Grease to Biodiesel Demonstration Project Report

    SciTech Connect

    San Francisco Public Utilities Commission; URS Corporation; Biofuels, Blackgold; Carollo Engineers

    2013-01-30

    program by other municipal agencies (as applicable). In order to accomplish the goals of the project, the following steps were performed: 1. Operation of a demonstration facility designed to receive 10,000 to 12,000 gallons of raw Trap Waste each day from private Trap Waste hauling companies. The demonstration facility was designed and built by Pacific Biodiesel Technologies (PBTech). The demonstration facility would also recover 300 gallons of Brown Grease per day from the raw Trap Waste. The recovered Brown Grease was expected to contain no more than 2% Moisture, Insolubles, and Unsaponifiables (MIU) combined. 2. Co-digestion of the side streams (generated during the recovery of 300 gallons of Brown Grease from the raw Trap Waste) with wastewater sludge in the WWTP's anaerobic digesters. The effects of the side streams on anaerobic digestion were quantified by comparison with baseline data. 3. Production of 240 gallons per day of ASTM D6751-S15 grade Biodiesel fuel via a Biodiesel conversion demonstration facility, with the use of recovered Brown Grease as a feedstock. The demonstration facility was designed and built by Blackgold Biofuels (BGB). Side streams from this process were also co-digested with wastewater sludge. Bench-scale anaerobic digestion testing was conducted on side streams from both demonstration facilities to determine potential toxicity and/or changes in biogas production in the WWTP anaerobic digester. While there is a lot of theoretical data available on the lab-scale production of Biodiesel from grease Trap Waste, this full-scale demonstration project was one of the first of its kind in the United States. The project's environmental impacts were expected to include: Reduction of greenhouse gas emissions by prevention of the release of methane at landfills. Although the combustion product of Biodiesel and Methane gas produced in the Anaerobic digester, Carbon Dioxide, is also a greenhouse gas; it is 20 times weaker for the same amount (per mole

  1. Final priority; National Institute on Disability and Rehabilitation Research--Disability and Rehabilitation Research Projects and Centers Program--Rehabilitation Engineering Research Centers. Final priority.

    PubMed

    2013-06-14

    The Assistant Secretary for Special Education and Rehabilitative Services announces a priority for a Rehabilitation Engineering Research Center (RERC) on Universal Interfaces and Information Technology Access under the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR). The Assistant Secretary may use this priority for a competition in fiscal year (FY) 2013 and later years. We take this action to focus research attention on areas of national need. We intend to use this priority to improve outcomes for individuals with disabilities.

  2. Hydraulic analysis and optimization design in Guri rehabilitation project

    NASA Astrophysics Data System (ADS)

    Cheng, H.; Zhou, L. J.; Gong, L.; Wang, Z. N.; Wen, Q.; Zhao, Y. Z.; Wang, Y. L.

    2016-11-01

    Recently Dongfang was awarded the contract for rehabilitation of 6 units in Guri power plant, the biggest hydro power project in Venezuela. The rehabilitation includes, but not limited to, the extension of output capacity by about 50% and enhancement of efficiency level. To achieve the targets the runner and the guide vanes will be replaced by the newly optimized designs. In addition, the out-of-date stay vanes with straight plate shape will be modified into proper profiles after considering the application feasibility in field. The runner and vane profiles were optimized by using state-of-the-art flow simulation techniques. And the hydraulic performances were confirmed by the following model tests. This paper describes the flow analysis during the optimization procedure and the comparison between various technical concepts.

  3. Town of Edinburg landfill reclamation demonstration project

    SciTech Connect

    Not Available

    1992-05-15

    Landfill reclamation is the process of excavating a solid waste landfill to recover materials, reduce environmental impacts, restore the land resource, and, in some cases, extend landfill life. Using conventional surface mining techniques and specialized separation equipment, a landfill may be separated into recyclable material, combustible material, a soil/compost fraction and residual waste. A landfill reclamation demonstration project was hosted at the Town of Edinburg municipal landfill in northwest Saratoga County. The report examines various separation techniques employed at the site and appropriate uses for reclaimed materials. Specifications regarding engineered work plans, health and safety monitoring, and contingency preparedness are discussed. Major potential applications and benefits of using landfill reclamation technology at existing landfills are identified and discussed. The research and development aspect of the report also examines optimal screening technologies, site selection protocol and the results of a test burn of reclaimed waste at a waste-to-energy facility. Landfill reclamation costs are developed, and economic comparisons are made between reclamation costs and conventional landfill closure costs, with key criteria identified. The results indicate that, although dependent on site-specific conditions and economic factors, landfill reclamation can be a technically and economically feasible alternative or companion to conventional landfill closure under a range of favorable conditions. Feasibility can be determined only after an investigation of the variety of landfill conditions and reclamation options.

  4. LIFAC Sorbent Injection Desulfurization Demonstration Project

    SciTech Connect

    Not Available

    1992-01-01

    The LIFAC technology has similarities to other sorbent injection technologies using humidification, but employs a unique patented vertical reaction chamber located down-stream of the boiler to facilitate and control the sulfur capture and other chemical reactions. This chamber improves the overall reaction efficiency enough to allow the use of pulverized limestone rather than more expensive reagents such as lime which are often used to increase the efficiency of other sorbent injection processes. Sorbent injection is a potentially important alternative to conventional wet lime and limestone scrubbing, and this project is another effort to test alternative sorbent injection approaches. In comparison to wet systems, LIFAC, with recirculation of the sorbent, removes less sulfur dioxide - 75--85% relative to 90% or greater for conventional scrubbers - and requires more reagent material. However, if the demonstration is successful, LIFAC will offer these important advantages over wet scrubbing systems: LIFAC is relatively easy to retrofit to an existing boiler and requires less area than conventional wet FGD systems; LIFAC is less expensive to install than conventional wet FGD processes; LIFAC's overall costs measured on a dollar-per-ton S0{sub 2} removed basis are less, an important advantage in a regulatory regime with trading of emission allocations. LIFAC produces a dry, readily disposable waste by-product versus a wet product; and LIFAC is relatively simple to operate.

  5. Rehabilitation of European Biological Soil Crusts - The SCIN project

    NASA Astrophysics Data System (ADS)

    Williams, Laura; Zheng, Lingjuan; Maier, Stefanie; Weber, Bettina; Büdel, Burkhard

    2015-04-01

    The ''Soil Crust INternational'' (SCIN) Project aims to improve the appreciation and understanding of European Biological Soil Crusts (BSC) with the goal of developing biodiversity conservation and sustainable management strategies. Our objective is to study the uniqueness of European BSC on a local scale and investigate how these communities thrive in areas with such great macroclimatic differences. In order to cover a wide diversity of European BSC a latitudinal transect was established, extending from the Great Alvar of Öland, Sweden in the north, down to Gössenheim, Central Germany and Hochtor in the Hohe Tauern National Park, Austria, continuing to the Badlands of Tabernas, in southern Spain. The transect stretches over 20° latitude and 2,300 m in altitude and includes natural and also semi-natural sites that require maintenance, for instance, by grazing. Within the SCIN project a rehabilitation study was initiated in order to investigate the recovery potential of BSC under different environmental conditions. This entailed the construction of 10 times 1m2 plots, alongside control plots, at each of the 4 sites, where the BSC was completely removed. Over the course of 2 years (2012-2014) the plots were sampled regularly to assess recovery in the form of returning organisms (cyanobacteria, algae, lichens, bryophytes, higher plants), soil stability, chlorophyll and carbon content and nutrient composition. Cyanobacteria are considered as the pioneering functional group of BSC establishment in many regions, especially arid, and may be critical for the successful formation of any of the further BSC successional stages. Therefore, the cyanobacterial assemblages of recovering plots are being investigated to shed light on the importance of cyanobacteria in the rehabilitation of BSC and whether individual species or specific communities can be ascribed to a local or wide geographical range. It also has to be considered the proximity of recovering BSC to established

  6. WSF Biodiesel Demonstration Project Final Report

    SciTech Connect

    Washington State University; University of Idaho; The Glosten Associates, Inc.; Imperium Renewables, Inc.

    2009-04-30

    engines. Each test vessel did experience a microbial growth bloom that produced a build up of material in the fuel purifiers similar to material witnessed in the 2004 fuel test. A biocide was added with each fuel shipment and the problem subsided. In January of 2009, the WSF successfully completed an eleven month biodiesel fuel test using approximately 1,395,000 gallons of biodiesel blended fuels. The project demonstrated that biodiesel can be used successfully in marine vessels and that current ASTM specifications are satisfactory for marine vessels. Microbial growth in biodiesel diesel interface should be monitored. An inspection of the engines showed no signs of being negatively impacted by the test.

  7. Small-Scale Hydroelectric Power Demonstration Project

    SciTech Connect

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  8. 34 CFR 350.1 - What is the Disability and Rehabilitation Research Projects and Centers Program?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Rehabilitation Engineering Research Centers. (Authority: Sec. 204; 29 U.S.C. 762) ... 34 Education 2 2013-07-01 2013-07-01 false What is the Disability and Rehabilitation Research... DISABILITY AND REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM General § 350.1 What is the...

  9. 34 CFR 350.1 - What is the Disability and Rehabilitation Research Projects and Centers Program?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Rehabilitation Engineering Research Centers. (Authority: Sec. 204; 29 U.S.C. 762) ... 34 Education 2 2012-07-01 2012-07-01 false What is the Disability and Rehabilitation Research... DISABILITY AND REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM General § 350.1 What is the...

  10. 34 CFR 350.1 - What is the Disability and Rehabilitation Research Projects and Centers Program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Rehabilitation Engineering Research Centers. (Authority: Sec. 204; 29 U.S.C. 762) ... 34 Education 2 2014-07-01 2013-07-01 true What is the Disability and Rehabilitation Research... DISABILITY AND REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM General § 350.1 What is the...

  11. 75 FR 34295 - Vocational Rehabilitation Service Projects for American Indians With Disabilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... Education 34 CFR Part 371 Vocational Rehabilitation Service Projects for American Indians With Disabilities... Regulations#0;#0; ] DEPARTMENT OF EDUCATION 34 CFR Part 371 RIN 1820-AB63 Vocational Rehabilitation Service..., without changes, interim final regulations for the American Indian Vocational Rehabilitation...

  12. 34 CFR 376.1 - What is the program of Special Projects and Demonstrations for Providing Transitional...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 2 2014-07-01 2013-07-01 true What is the program of Special Projects and....1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS AND DEMONSTRATIONS...

  13. 34 CFR 376.1 - What is the program of Special Projects and Demonstrations for Providing Transitional...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 2 2012-07-01 2012-07-01 false What is the program of Special Projects and....1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS AND DEMONSTRATIONS...

  14. 34 CFR 376.1 - What is the program of Special Projects and Demonstrations for Providing Transitional...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 2 2013-07-01 2013-07-01 false What is the program of Special Projects and....1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS AND DEMONSTRATIONS...

  15. 34 CFR 376.1 - What is the program of Special Projects and Demonstrations for Providing Transitional...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true What is the program of Special Projects and....1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS AND DEMONSTRATIONS...

  16. 34 CFR 376.1 - What is the program of Special Projects and Demonstrations for Providing Transitional...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What is the program of Special Projects and....1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS AND DEMONSTRATIONS...

  17. Final priorities; National Institute on Disability and Rehabilitation Research--Disability and Rehabilitation Research Projects and Centers Program--Rehabilitation Engineering Research Centers. Final priorities.

    PubMed

    2013-06-11

    The Assistant Secretary for Special Education and Rehabilitative Services announces priorities under the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR). Specifically, we announce priorities for a Rehabilitation Engineering Research Center (RERC) on Rehabilitation Strategies, Techniques, and Interventions (Priority 1), Information and Communication Technologies Access (Priority 2), Individual Mobility and Manipulation (Priority 3), and Physical Access and Transportation (Priority 4). The Assistant Secretary may use one or more of these priorities for competitions in fiscal year (FY) 2013 and later years. We take this action to focus research attention on areas of national need. We intend these priorities to improve community living and participation, health and function, and employment outcomes of individuals with disabilities.

  18. Hartford Labor Mobility Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Connecticut State Dept. of Public Welfare, Hartford.

    The project was an effort to relocate unemployed and underemployed persons, predominantly Negroes and Puerto Ricans, from the ghetto to the suburbs to learn whether job finding assistance, counseling and relocation could enable families with an able-bodied wage earner to get off welfare rolls. (NTIS)

  19. 76 FR 80907 - TRICARE Prime Urgent Care Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... of the Secretary TRICARE Prime Urgent Care Demonstration Project AGENCY: Department of Defense..., entitled Department Of Defense TRICARE Prime Urgent Care Demonstration Project. The demonstration project is intended to test whether allowing four visits to an urgent care center without requiring...

  20. 76 FR 12080 - TRICARE Access to Care Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... of the Secretary TRICARE Access to Care Demonstration Project AGENCY: Department of Defense. ACTION..., entitled Department of Defense TRICARE Access to Care Demonstration Project. The demonstration project is intended to improve access to urgent care including minor illness or injury for Coast Guard...

  1. Utility Scale Wind turbine Demonstration Project

    SciTech Connect

    Terry Fredericks

    2006-03-31

    The purpose of the Three Affiliated Tribes proposing to Department of Energy was nothing new to Denmark. National Meteorological Studies have proved that North Dakota has some of the most consistence wind resources in the world. The Three Affiliated Tribes wanted to assess their potential and become knowledgeable to developing this new and upcoming resource now valuable. By the Tribe implementing the Utility-scale Wind Turbine Project on Fort Berthold, the tribe has proven the ability to complete a project, and has already proceeded in a feasibility studies to developing a large-scale wind farm on the reservation due to tribal knowledge learned, public awareness, and growing support of a Nation wanting clean renewable energy. The tribe is working through the various measures and regulations with the want to be self-sufficient, independent, and marketable with 17,000 times the wind energy needed to service Fort Berthold alone.

  2. 33 CFR 203.85 - Rehabilitation of Federal flood control projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Rehabilitation of Federal flood... PROCEDURES Local Interests/Cooperation Agreements § 203.85 Rehabilitation of Federal flood control projects. Some sponsors of Federal flood control projects are not required to furnish written assurances of...

  3. 33 CFR 203.85 - Rehabilitation of Federal flood control projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Rehabilitation of Federal flood... PROCEDURES Local Interests/Cooperation Agreements § 203.85 Rehabilitation of Federal flood control projects. Some sponsors of Federal flood control projects are not required to furnish written assurances of...

  4. 33 CFR 203.85 - Rehabilitation of Federal flood control projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Rehabilitation of Federal flood... PROCEDURES Local Interests/Cooperation Agreements § 203.85 Rehabilitation of Federal flood control projects. Some sponsors of Federal flood control projects are not required to furnish written assurances of...

  5. 33 CFR 203.85 - Rehabilitation of Federal flood control projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Rehabilitation of Federal flood... PROCEDURES Local Interests/Cooperation Agreements § 203.85 Rehabilitation of Federal flood control projects. Some sponsors of Federal flood control projects are not required to furnish written assurances of...

  6. 33 CFR 203.85 - Rehabilitation of Federal flood control projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Rehabilitation of Federal flood... PROCEDURES Local Interests/Cooperation Agreements § 203.85 Rehabilitation of Federal flood control projects. Some sponsors of Federal flood control projects are not required to furnish written assurances of...

  7. Cryogenic Barrier Demonstration Project. Final report

    SciTech Connect

    Johnson, L.A.; Yarmak, E.; Long, E.L.

    2000-03-01

    A long-term frozen soil barrier was implemented at the HRE (Homogeneous Reactor Experiment) Pond facility at the Oak Ridge National Laboratory in 1997. This was performed to verify the technical feasibility and costs of deploying a frozen barrier at a radiologically contaminated site. Work began in September 1996 and progressed through to December 1999. The frozen barrier has been operational since November 1997. Verification of the barrier integrity was performed independently by the EPA's SITE Program. This project showed frozen barriers offer a proven technology to retain below grade hazardous substances at relatively low costs with minimal effect on the environment.

  8. Biorefinery Demonstration Project Final Progress Report

    SciTech Connect

    Lee, David

    2015-10-20

    In this project we focused on various aspects of biorefinery technology development including algal-biorefinery technology, thermochemical conversion of biomass to bio-oils and biochar; we tested characteristics and applications of biochars and evaluated nutrient cycling with wastewater treatment by the coupling of algal culture systems and anaerobic digestion. Key results include a method for reducing water content of bio-oil through atomized alcohol addition. The effect included increasing the pH and reducing the viscosity and cloud point of the bio-oil. Low input biochar production systems were evaluated via literature reviews and direct experimental work. Additionally, emissions were evaluated and three biochar systems were compared via a life cycle analysis. Attached growth systems for both algal cultivation and algal harvesting were found to be superior to suspended growth cultures. Nutrient requirements for algal cultivation could be obtained by the recycling of anaerobic digester effluents, thus experimentally showing that these two systems could be directly coupled. Twenty-two journal articles and six intellectual property applications resulted from the cumulative work that this project contributed to programmatically.

  9. Milliken Clean Coal Technology Demonstration Project. Project performance summary, Clean Coal Technology Demonstration Program

    SciTech Connect

    None, None

    2002-11-30

    The New York State Electric & Gas Corporation (NYSEG) demonstrated a combination of technologies at its Milliken Station in Lansing, New York, designed to: (1) achieve high sulfur dioxide (SO2) capture efficiency, (2) bring nitrogen oxide (NOx) emissions into compliance with Clean Air Act Amendments of 1990 (CAAA), (3) maintain high station efficiency, and (4) eliminate waste water discharge. This project is part of the U.S. Department of Energy's (DOE) Clean Coal Technology Demonstration Program (CCTDP) established to address energy and environmental concerns related to coal use. DOE sought cost-shared partnerships with industry through five nationally competed solicitations to accelerate commercialization of the most promising advance coal-based power generation and pollution control technologies. The CCTDP, valued at over five billion dollars, has significantly leveraged federal funding by forging effective partnerships founded on sound principles. For every federal dollar invested, CCTDP participants have invested two dollars. These participants include utilities, technology developers, state governments, and research organizations. The project presented here was one of nine selected in January 1991 from 33 proposals submitted in response to the program's fourth solicitation.

  10. FIELD DEMONSTRATION AND QUALITY ASSURANCE PROJECT PLAN

    EPA Science Inventory

    The Demonstration of innovative field devices for the measurement of mercury in soil and sediment is being conducted under the EPA's SITE Program in February 2003 at the United States Department of Energy's (DOE) Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee and th...

  11. DOE`s annealing prototype demonstration projects

    SciTech Connect

    Warren, J.; Nakos, J.; Rochau, G.

    1997-02-01

    One of the challenges U.S. utilities face in addressing technical issues associated with the aging of nuclear power plants is the long-term effect of plant operation on reactor pressure vessels (RPVs). As a nuclear plant operates, its RPV is exposed to neutrons. For certain plants, this neutron exposure can cause embrittlement of some of the RPV welds which can shorten the useful life of the RPV. This RPV embrittlement issue has the potential to affect the continued operation of a number of operating U.S. pressurized water reactor (PWR) plants. However, RPV material properties affected by long-term irradiation are recoverable through a thermal annealing treatment of the RPV. Although a dozen Russian-designed RPVs and several U.S. military vessels have been successfully annealed, U.S. utilities have stated that a successful annealing demonstration of a U.S. RPV is a prerequisite for annealing a licensed U.S. nuclear power plant. In May 1995, the Department of Energy`s Sandia National Laboratories awarded two cost-shared contracts to evaluate the feasibility of annealing U.S. licensed plants by conducting an anneal of an installed RPV using two different heating technologies. The contracts were awarded to the American Society of Mechanical Engineers (ASME) Center for Research and Technology Development (CRTD) and MPR Associates (MPR). The ASME team completed its annealing prototype demonstration in July 1996, using an indirect gas furnace at the uncompleted Public Service of Indiana`s Marble Hill nuclear power plant. The MPR team`s annealing prototype demonstration was scheduled to be completed in early 1997, using a direct heat electrical furnace at the uncompleted Consumers Power Company`s nuclear power plant at Midland, Michigan. This paper describes the Department`s annealing prototype demonstration goals and objectives; the tasks, deliverables, and results to date for each annealing prototype demonstration; and the remaining annealing technology challenges.

  12. 78 FR 35761 - Final Priority; National Institute on Disability and Rehabilitation Research-Disability and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... research, demonstration projects, training, and related activities, including international activities, to... CFR Chapter III Final Priority; National Institute on Disability and Rehabilitation Research--Disability and Rehabilitation Research Projects and Centers Program--Rehabilitation Engineering...

  13. Solar energy parking canopy demonstration project

    SciTech Connect

    Cylwik, Joe; David, Lawrence

    2015-09-24

    The goal of this pilot/demonstration program is to measure the viability of using solar photovoltaic (PV) technology at three locations in a mountain community environment given the harsh weather conditions. An additional goal is to reduce long-term operational costs, minimize green house gas emissions, lower the dependency on energy produced from fossil fuels, and improve the working environment and health of city employees and residents.

  14. The Fort Bragg Mental Health Demonstration Project

    DTIC Science & Technology

    1992-08-01

    determined by clinical assessment; and by positive change in indicators of social and educational functioning and are there reductions in costs? If so...managed care for social work in psychiatric hospitals. Hospitals and Community Psychiatry, 41, 1063-1064. Faltermayer, E. (1992, March 23). Let’s really...developmental, social , medical, and mental health needs. There has not been a definitive study that has demonstrated the superiority of the continuum of care

  15. Nucla circulating atmospheric fluidized bed demonstration project

    SciTech Connect

    Not Available

    1991-01-31

    During the fourth quarter of 1990, steady-state performance testing at the Nucla Circulating Fluidized Bed (CFB) resumed under sponsorship of the US Department of Energy. Co-sponsorship of the Demonstration Test Program by the Electric Power Research Institute (EPRI) was completed on June 15, 1990. From October through December, 1990, Colorado-Ute Electric Association (CUEA) completed a total of 23 steady-state performance tests, 4 dynamic tests, and set operating records during November and December as the result of improved unit operating reliability. Highlight events and achievements during this period of operation are presented.

  16. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project

    SciTech Connect

    Keith, Raymond E.; Heller, Thomas J.; Bush, Stuart A.

    1991-01-01

    This Annual Report on Colorado-Ute Electric Association's NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration plan was completed. (VC)

  17. Poland petroleum refinery sludge lagoon demonstration project

    SciTech Connect

    Altman, D.J.

    2000-05-05

    The US Department of Energy and the Institute for Ecology of Industrial Area have been working together to develop mutually beneficial, cost-effective environmental remediation technologies such as the demonstration of bioremediation techniques for the clean up of acidic petroleum sludge impacted soils at an oil refinery in southern Poland. After an expedited site characterization, treatability study, and a risk assessment study, a remediation strategy was devised. The waste material was composed primarily of high molecular weight paraffinic and polynuclear aromatic hydrocarbons. A biopile design which employed a combination of passive and active aeration in conjunction with nutrient and surfactant application as used to increase the biodegradation of the contaminants of concern.

  18. 20 CFR 638.700 - Experimental, research, and demonstration projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... projects. 638.700 Section 638.700 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR JOB CORPS PROGRAM UNDER TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Experimental, Research, and Demonstration Projects § 638.700 Experimental, research, and demonstration projects. (a) The Job Corps...

  19. 20 CFR 638.700 - Experimental, research, and demonstration projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... projects. 638.700 Section 638.700 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR JOB CORPS PROGRAM UNDER TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Experimental, Research, and Demonstration Projects § 638.700 Experimental, research, and demonstration projects. (a) The Job Corps...

  20. El Dorado micellar-polymer demonstration project

    SciTech Connect

    Rosenwald, G.W.

    1980-02-01

    The micellar fluid injection was completed in the north (Chesney) pattern, and injection of polymer soluttion was initiated. Polymer solution was injected into the south (Hegberg) pattern during the entire reporting period. The third step of the graded polymer injection design is nearing completion. Fluid movement at the observation wells has been monitored closely. Oil mobilization has been indicated by the detection of an oil bank moving past some of the observation wells in both patterns. No significant changes in fluid composition have occurred at the eight production wells during this reporting period. Three flow tests designed to define the optimal salinity for the north pattern polymer drive were made using El Dorado 650-ft Sandstone cores. Results of these tests indicated that a polymer drive with 1.0 wt %. NaCl in El Dorado lake water has the highest oil recovery efficiency. The pressures in the project monitoring wells were measured four times. Two sets of pressure transient tests were conducted to determine the extent of a hydraulic fracture of well MP-213; these tests also involved wells MP-226 and MP-227. An extensive discussion of the west-to-east pressure gradient observed in the field was presented last year. Data indicate the gradient still exists. Computations show that the gradient cannot be caused by the degree of reservoir heterogeneity thought to exist in the El Dorado reservoir. Although the cause of the gradient remains unexplained, its adverse impact on ultimate oil recovery could be significant and should be considered in future performance modeling. An estimate of recovery efficiency was made based on the updated calculations and the data taken for the one-foot interval at well MP-131. These preliminary results showed about 40% displacement efficiency.

  1. 38 CFR 21.390 - Rehabilitation research and special projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... VETERANS AFFAIRS (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Vocational Rehabilitation and...(b)) (c) Research by Vocational Rehabilitation and Employment (VR&E) staff members. VA will encourage research by VR&E staff members. This research will address problems affecting service delivery,...

  2. 34 CFR 350.12 - What are the general requirements for an Advanced Rehabilitation Research Training Project?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Rehabilitation Research Training Project? 350.12 Section 350.12 Education Regulations of the Offices of the... EDUCATION DISABILITY AND REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM What Projects Does the Secretary Assist? § 350.12 What are the general requirements for an Advanced Rehabilitation...

  3. Airway Science Curriculum Demonstration Project: Summary of Initial Evaluation Findings

    DTIC Science & Technology

    1988-10-01

    DEMONSTRATION PROJECT: Or C988 SUMMARY OF INITIAL EVALUATION FINDINGS 8. Performn 9 Organ zaton Report No. 7. Author’ s$ Debora L. Clough 9...Airway Science project objectives for which data were available. Two limitations associated with the project evaluation at this time were described... EVALUATION FINDINGS INTRODUCTION The Airway Science Curriculum Demonstration Project was designed to investigate the effectiveness of an alternative approach

  4. Planning and Evaluating Telecommunications Demonstration Projects and Assessing the Costs of Telecommunications Demonstration Projects. Final Report #146-03.

    ERIC Educational Resources Information Center

    Clippinger, John H.; Fain, Sanford B.

    This two-report volume was prepared to describe approaches for evaluating individual Office of Telecommunications Policy (OTP) demonstration projects in the future and to aid demonstration project directors in project planning and development. The first report focuses on the role of planning and evaluation activities, stressing their importance in…

  5. Community Based Demonstration Projects: Willamette Ecosystem Services Project (WESP)

    EPA Science Inventory

    EPA’s Ecosystem Services Research Program in the Office of Research and Development is focused on the study of ecosystem services and the benefits to human well-being provided by ecological systems. As part of this research effort, the Willamette Ecosystems Services Project (WE...

  6. 77 FR 34363 - Disability and Rehabilitation Research Projects and Centers Program; Traumatic Brain Injury Model...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... attention on areas of national need. DATES: Effective Date: This priority is effective July 11, 2012. FOR... vocational rehabilitation process. Section 21 of the Rehabilitation Act specifically mentions groups of... notice. Comment: None. Discussion: In keeping with prior practice, NIDRR expects the project directors...

  7. 34 CFR 369.1 - What are the Vocational Rehabilitation Service Projects?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 2 2012-07-01 2012-07-01 false What are the Vocational Rehabilitation Service Projects? 369.1 Section 369.1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION...

  8. 34 CFR 369.1 - What are the Vocational Rehabilitation Service Projects?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 2 2014-07-01 2013-07-01 true What are the Vocational Rehabilitation Service Projects? 369.1 Section 369.1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION...

  9. 34 CFR 369.1 - What are the Vocational Rehabilitation Service Projects?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true What are the Vocational Rehabilitation Service Projects? 369.1 Section 369.1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION...

  10. 34 CFR 369.1 - What are the Vocational Rehabilitation Service Projects?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 2 2013-07-01 2013-07-01 false What are the Vocational Rehabilitation Service Projects? 369.1 Section 369.1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION...

  11. 23 CFR 650.411 - Procedures for bridge replacement and rehabilitation projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.411 Procedures for bridge replacement and rehabilitation projects. (a) Consideration... 23 Highways 1 2010-04-01 2010-04-01 false Procedures for bridge replacement and...

  12. 23 CFR 650.411 - Procedures for bridge replacement and rehabilitation projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.411 Procedures for bridge replacement and rehabilitation projects. (a) Consideration... 23 Highways 1 2014-04-01 2014-04-01 false Procedures for bridge replacement and...

  13. 23 CFR 650.411 - Procedures for bridge replacement and rehabilitation projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.411 Procedures for bridge replacement and rehabilitation projects. (a) Consideration... 23 Highways 1 2013-04-01 2013-04-01 false Procedures for bridge replacement and...

  14. 23 CFR 650.411 - Procedures for bridge replacement and rehabilitation projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.411 Procedures for bridge replacement and rehabilitation projects. (a) Consideration... 23 Highways 1 2011-04-01 2011-04-01 false Procedures for bridge replacement and...

  15. 23 CFR 650.411 - Procedures for bridge replacement and rehabilitation projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.411 Procedures for bridge replacement and rehabilitation projects. (a) Consideration... 23 Highways 1 2012-04-01 2012-04-01 false Procedures for bridge replacement and...

  16. AREAWIDE SUPPRESSION OF FIRE ANTS: DEMONSTRATION PROJECT IN MISSISSIPPI, 2006

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The USDA-ARS demonstration project for the suppression of imported fire ants has entered its sixth year. In 2005, Mississippi State University joined the project monitoring sites in Clay and Grenada Counties. The Areawide project integrates biological control agents with the chemical ...

  17. Long-Term Assessment of an Innovative Mangrove Rehabilitation Project: Case Study on Carey Island, Malaysia

    PubMed Central

    Motamedi, Shervin; Hashim, Roslan; Zakaria, Rozainah; Song, Ki-Il; Sofawi, Bakrin

    2014-01-01

    Wave energy and storm surges threaten coastal ecology and nearshore infrastructures. Although coastal structures are conventionally constructed to dampen the wave energy, they introduce tremendous damage to the ecology of the coast. To minimize environmental impact, ecofriendly coastal protection schemes should be introduced. In this paper, we discuss an example of an innovative mangrove rehabilitation attempt to restore the endangered mangroves on Carey Island, Malaysia. A submerged detached breakwater system was constructed to dampen the energy of wave and trap the sediments behind the structure. Further, a large number of mangrove seedlings were planted using different techniques. Further, we assess the possibility of success for a future mangrove rehabilitation project at the site in the context of sedimentology, bathymetry, and hydrogeochemistry. The assessment showed an increase in the amount of silt and clay, and the seabed was noticeably elevated. The nutrient concentration, the pH value, and the salinity index demonstrate that the site is conducive in establishing mangrove seedlings. As a result, we conclude that the site is now ready for attempts to rehabilitate the lost mangrove forest. PMID:25097894

  18. Long-term assessment of an innovative mangrove rehabilitation project: case study on Carey Island, Malaysia.

    PubMed

    Motamedi, Shervin; Hashim, Roslan; Zakaria, Rozainah; Song, Ki-Il; Sofawi, Bakrin

    2014-01-01

    Wave energy and storm surges threaten coastal ecology and nearshore infrastructures. Although coastal structures are conventionally constructed to dampen the wave energy, they introduce tremendous damage to the ecology of the coast. To minimize environmental impact, ecofriendly coastal protection schemes should be introduced. In this paper, we discuss an example of an innovative mangrove rehabilitation attempt to restore the endangered mangroves on Carey Island, Malaysia. A submerged detached breakwater system was constructed to dampen the energy of wave and trap the sediments behind the structure. Further, a large number of mangrove seedlings were planted using different techniques. Further, we assess the possibility of success for a future mangrove rehabilitation project at the site in the context of sedimentology, bathymetry, and hydrogeochemistry. The assessment showed an increase in the amount of silt and clay, and the seabed was noticeably elevated. The nutrient concentration, the pH value, and the salinity index demonstrate that the site is conducive in establishing mangrove seedlings. As a result, we conclude that the site is now ready for attempts to rehabilitate the lost mangrove forest.

  19. Student Assistance Program Demonstration Project Evaluation. Final Report.

    ERIC Educational Resources Information Center

    Pollard, John A.; Houle, Denise M.

    This document presents the final report on the evaluation of California's model student assistance program (SAP) demonstration projects implemented in five locations across the state from July 1989 through June 1992. The report provides an overall, integrated review of the evaluation of the SAP demonstration projects, summarizes important findings…

  20. Recycling and composting demonstration projects for the Memphis region

    SciTech Connect

    Muller, D.

    1992-05-01

    This report documents the development and implementation of the project entitled ``Recycling and Composting Demonstration Projects for the Memphis Region.`` The project was funded by the Energy Task Force of the Urban Consortium for Technology Initiatives. This Project was implemented by the staff of the Special Programs Section of the Memphis and Shelby County Division of Planning and Development. The project began November 1, 1990, and was completed December 31, 1991. The purpose of the project was to evaluate the feasibility of a variety of solid waste disposal alternatives.

  1. Recycling and composting demonstration projects for the Memphis region

    SciTech Connect

    Muller, D. )

    1992-05-01

    This report documents the development and implementation of the project entitled Recycling and Composting Demonstration Projects for the Memphis Region.'' The project was funded by the Energy Task Force of the Urban Consortium for Technology Initiatives. This Project was implemented by the staff of the Special Programs Section of the Memphis and Shelby County Division of Planning and Development. The project began November 1, 1990, and was completed December 31, 1991. The purpose of the project was to evaluate the feasibility of a variety of solid waste disposal alternatives.

  2. 78 FR 42871 - Final Extension of Project Period and Waiver; Rehabilitation Continuing Education Program for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION 34 CFR Chapter III Final Extension of Project Period and Waiver; Rehabilitation Continuing Education Program for the Technical Assistance and Continuing Education Centers (TACE Centers)...

  3. Vitrification facility at the West Valley Demonstration Project

    SciTech Connect

    DesCamp, V.A.; McMahon, C.L.

    1996-07-01

    This report is a description of the West Valley Demonstration Project`s vitrification facilities from the establishment of the West Valley, NY site as a federal and state cooperative project to the completion of all activities necessary to begin solidification of radioactive waste into glass by vitrification. Topics discussed in this report include the Project`s background, high-level radioactive waste consolidation, vitrification process and component testing, facilities design and construction, waste/glass recipe development, integrated facility testing, and readiness activities for radioactive waste processing.

  4. Prioritizing sewer rehabilitation projects using AHP-PROMETHEE II ranking method.

    PubMed

    Kessili, Abdelhak; Benmamar, Saadia

    2016-01-01

    The aim of this paper is to develop a methodology for the prioritization of sewer rehabilitation projects for Algiers (Algeria) sewer networks to support the National Sanitation Office in its challenge to make decisions on prioritization of sewer rehabilitation projects. The methodology applies multiple-criteria decision making. The study includes 47 projects (collectors) and 12 criteria to evaluate them. These criteria represent the different issues considered in the prioritization of the projects, which are structural, hydraulic, environmental, financial, social and technical. The analytic hierarchy process (AHP) is used to determine weights of the criteria and the Preference Ranking Organization Method for Enrichment Evaluations (PROMETHEE II) method is used to obtain the final ranking of the projects. The model was verified using the sewer data of Algiers. The results have shown that the method can be used for prioritizing sewer rehabilitation projects.

  5. Radiation safety at the West Valley Demonstration Project

    SciTech Connect

    Hoffman, R.L.

    1997-05-06

    This is a report on the Radiation Safety Program at the West Valley Demonstration Project (WVDP). This Program covers a number of activities that support high-level waste solidification, stabilization of facilities, and decontamination and decommissioning activities at the Project. The conduct of the Program provides confidence that all occupational radiation exposures received during operational tasks at the Project are within limits, standards, and program requirements, and are as low as reasonably achievable.

  6. Tampa Bay Ecosystem Services Demonstration Project Website: Phase II

    EPA Science Inventory

    The Tampa Bay Ecosystem Services Demonstration Project models the impact of human development and natural stressors on the economic, aesthetic and cultural value of local ecosystems. By linking ecological structures, functions, and condition to the ecosystem services valued by h...

  7. MINE WASTE TECHNOLOGY PROGRAM - UNDERGROUND MINE SOURCE CONTROL DEMONSTRATION PROJECT

    EPA Science Inventory

    This report presents results of the Mine Waste Technology Program Activity III, Project 8, Underground Mine Source Control Demonstration Project implemented and funded by the U. S. Environmental Protection Agency (EPA) and jointly administered by EPA and the U. S. Department of E...

  8. Milliken Clean Coal Demonstration Project: A DOE Assessment

    SciTech Connect

    National Energy Technology Laboratory

    2001-08-15

    The goal of the U.S. Department of Energy's (DOE) Clean Coal Technology (CCT) program is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal-utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage.

  9. Childhood Obesity Research Demonstration project: Cross-site evaluation method

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Childhood Obesity Research Demonstration (CORD) project links public health and primary care interventions in three projects described in detail in accompanying articles in this issue of Childhood Obesity. This article describes a comprehensive evaluation plan to determine the extent to which th...

  10. Rural Workplace Literacy Demonstration Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Enterprise State Junior Coll., AL.

    In April 1991, Enterprise State Junior College and MacArthur State Technical College established a rural workplace literacy demonstration project in partnership with adult basic education, seven employers, and a labor organization. The project served 615 persons in classes offered at the 2 colleges, 4 partner locations, and 3 additional worksites.…

  11. Demonstration and Evaluation of Innovative Wastewater Main Rehabilitation Technologies (WERF Report INFR4R11)

    EPA Science Inventory

    The lack of knowledge on the performance of innovative wastewater rehabilitation technologies, specifically for large-diameter pipes, and the limited ability to determine the most cost-effective, long-term rehabilitation methods for wastewater collection systems, has been identif...

  12. The ethanol heavy-duty truck fleet demonstration project

    SciTech Connect

    1997-06-01

    This project was designed to test and demonstrate the use of a high- percentage ethanol-blended fuel in a fleet of heavy-duty, over-the- road trucks, paying particular attention to emissions, performance, and repair and maintenance costs. This project also represents the first public demonstration of the use of ethanol fuels as a viable alternative to conventional diesel fuel in heavy-duty engines.

  13. 75 FR 14582 - Office of Special Education and Rehabilitative Services-Special Demonstration Programs-Model...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    .... Proposed Priority This notice contains one proposed priority. Model Demonstration Projects To Improve... to last at least one year or result in death. The SSI program is an income supplement program that... to Work program as an employment network services provider or through a cost reimbursement...

  14. DOE small-scale hydroelectric demonstration project: Riegel Textile Corporation, Fries, Virginia plant hydroproject. Final technical and construction cost report

    SciTech Connect

    Not Available

    1982-06-01

    The Riegel Textile Corporation completed a 2163 kW generator project at its plant in Fries, Virginia. A new powerhouse was constructed to enclose a used 2900 hp vertical Kaplan turbine and Westinghouse generator. Construction was accomplished without modification to or rehabilitation of an existing dam and required only minor modification to or rehabilitation of an existing dam and required only minor modification to the existing appurtenances. The existing hydro-generation equipment supplies approximately 54% of the 5500 kW required by the Fries plant. With the addition of the new facility, the plant will generate approximately 74% of its total electrical requirements. This demonstrates the viability of utilizing hydro-generation in the operation of an industrial facility. The project annually generates a National Energy Savings of 19,387 barrels of oil equivalent. The project was separated into four phases which lasted a total of 36 months and included construction, erection and demonstration.

  15. Relighting demonstration project Robins Air Force Base, Georgia

    SciTech Connect

    Larson, L.L.; Purcell, C.W.; McKay, H.; Harris, L.

    1994-09-01

    Significant energy savings are available through relighting with modern, energy efficient systems. As a demonstration, a relighting project was recently completed at Robins Air Force Base, Warner-Robins, Georgia. The project was designed to overcome a reluctance to pursue large scale relighting of the entire facility due to prior unfavorable experiences and an unusually large non-office working environment. The project followed contemporary lighting design practices, with the added dimension of involving building occupants in the process. Involving building occupants promoted their acceptance of the project and provided needed critical feedback. Their involvement helped secure their assistance in resolving special design concerns involving radio frequency interference and glare. Although often cited as simple, relighting projects are commonly confronted with problems. This document describes problems, foreseen and unforeseen, encountered by this relighting demonstration, and their solutions.

  16. 78 FR 22527 - TRICARE Access to Care Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-16

    ... of the Secretary TRICARE Access to Care Demonstration Project AGENCY: Department of Defense. ACTION: Notice of Extension of the TRICARE South Region United States Coast Guard Access to Care Demonstration... fiscal year to TRICARE authorized Urgent Care Centers without obtaining an authorization from...

  17. A Demonstration Project: "The Good Life" for Infants and Toddlers.

    ERIC Educational Resources Information Center

    Keister, Mary Elizabeth

    In response to requests for information on a city day-care program, a demonstration project for infants and toddlers, the Demonstration Nursery Center at the University of North Carolina, is reported. Physical makeup of the facilities is described, along with daily procedures and staff activities. To study the effects of day care on babies, a…

  18. 77 FR 37022 - Disability and Rehabilitation Research Projects and Centers Program; Rehabilitation Engineering...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... and development activities in the areas of both assistance and therapy robots for use by individuals... utility of assistance robots so that they are more efficient and effective facilitators of independence... use of therapy robots beyond large rehabilitation centers and into more community and...

  19. Santa Clara County Planar Solid Oxide Fuel Cell Demonstration Project

    SciTech Connect

    Fred Mitlitsky; Sara Mulhauser; David Chien; Deepak Shukla; David Weingaertner

    2009-11-14

    The Santa Clara County Planar Solid Oxide Fuel Cell (PSOFC) project demonstrated the technical viability of pre-commercial PSOFC technology at the County 911 Communications headquarters, as well as the input fuel flexibility of the PSOFC. PSOFC operation was demonstrated on natural gas and denatured ethanol. The Santa Clara County Planar Solid Oxide Fuel Cell (PSOFC) project goals were to acquire, site, and demonstrate the technical viability of a pre-commercial PSOFC technology at the County 911 Communications headquarters. Additional goals included educating local permit approval authorities, and other governmental entities about PSOFC technology, existing fuel cell standards and specific code requirements. The project demonstrated the Bloom Energy (BE) PSOFC technology in grid parallel mode, delivering a minimum 15 kW over 8760 operational hours. The PSOFC system demonstrated greater than 81% electricity availability and 41% electrical efficiency (LHV net AC), providing reliable, stable power to a critical, sensitive 911 communications system that serves geographical boundaries of the entire Santa Clara County. The project also demonstrated input fuel flexibility. BE developed and demonstrated the capability to run its prototype PSOFC system on ethanol. BE designed the hardware necessary to deliver ethanol into its existing PSOFC system. Operational parameters were determined for running the system on ethanol, natural gas (NG), and a combination of both. Required modeling was performed to determine viable operational regimes and regimes where coking could occur.

  20. Demonstration of an Innovative Large-Diameter Sewer Rehabilitation Technology in Houston, Texas

    EPA Science Inventory

    While sewer renewal technologies currently being used for the repair, replacement and/or rehabilitation of deteriorating wastewater collection systems are generally effective, there is still room for improvement of existing technologies and for the development of new technologies...

  1. Demonstration of an Innovative Large-Diameter Sewer Rehabilitation Technology in Houston, Texas - slides

    EPA Science Inventory

    While sewer renewal technologies currently being used for the repair, replacement and/or rehabilitation of deteriorating wastewater collection systems are generally effective, there is still room for improvement of existing technologies and for the development of new technologies...

  2. Demonstration and Evaluation of an Innovative Water Main Rehabilitation Technology: Spray-on Polymeric Lining

    EPA Science Inventory

    Many utilities are seeking innovative rehabilitation technologies to extend the life and fix larger portions of their water distribution systems with current funding levels. The information on the capabilities and applicability of new technologies is not always readily available...

  3. Final Report - Navajo Electrification Demonstration Project - FY2004

    SciTech Connect

    Kenneth L. Craig, Interim General Manager

    2007-03-31

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

  4. 77 FR 13578 - Disability and Rehabilitation Research Project; Traumatic Brain Injury Model Systems Centers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ... Disability and Rehabilitation Research Project; Traumatic Brain Injury Model Systems Centers AGENCY: Office... Brain Injury Model Systems Centers. CFDA Number: 84.133A-5. SUMMARY: The Assistant Secretary for Special... Projects (DRRPs) to serve as Traumatic Brain Injury Model Systems (TBIMS) Centers. The Assistant...

  5. International rehabilitation project for the territories contaminated as a result of the ChNPP accident

    SciTech Connect

    Polyakov, A.S.; Raginsky, L.S.; Rybakov, K.A.

    1993-12-31

    The international rehabilitation project for the territories contaminated as a result of the ChNPP accident is described. The project includes the development of techniques and hardware for decontamination of soils in the suffered regions Russia, the Ukraina, and Byelorussia, in view of differences in composition of soils, their structure, landscape and geological characteristic properties.

  6. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    SciTech Connect

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-15

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables.

  7. Final report for the Department of Energy funded cooperative agreement ''Electronic Research Demonstration Project'' [University electronic research administration demonstration project

    SciTech Connect

    Rodman, John

    1998-07-31

    This is the final report for the Department of Energy (DOE) funded cooperative agreement ''Electronic Research Demonstration Project (DE-FC02-92ER35180)'' for the period August 1994-July 1998. The goal of the project, referred to as NewERA, was to demonstrate the use of open standards for electronic commerce to support research administration, otherwise referred to as Electronic Research Administration (ERA). The NewERA demonstration project provided a means to test interagency standards developed within the Federal Grant Electronic Commerce Committee, a group comprised of federal granting agencies. The NewERA program was initiated by DOE. NewERA was comprised of three separate, but related, ERA activities in preaward administration, postaward administration, and secure Internet commerce. The goal of New ERA was to demonstrate an open standard implementation of ERA using electronic data interchange, e-mail and Internet transaction security between grant applicants and DOE, along with t h e other participating agencies.

  8. Evaluation of the El Dorado micellar-polymer demonstration project

    SciTech Connect

    Vanhorn, L.E.

    1983-01-01

    The El Dorado Micellar-Polymer Demonstration Project has been a cooperative venture between Cities Service Co. and the U.S. Department of Energy. The objective of the project was to determine if it was technically and economically feasible to produce commercial volumes of oil using a micellar-polymer process in the El Dorado field. The project was designed to allow a side-by-side comparison of 2 distinctly different micellar-polymer processes in the same field in order that the associated benefits and problems of each could be determined. These are described and evaluated.

  9. Evaluation of the El Dorado Micellar-Polymer Demonstration Project

    SciTech Connect

    VanHorn, L.E.

    1983-06-01

    The El Dorado Micellar-Polymer Demonstration Project has been a cooperative venture between Cities Service Company and the United States Department of Energy. The objective of the project was to determine if it was technically and economically feasible to produce commercial volumes of oil using a micellar-polymer process in the El Dorado field. The project was designed to allow a side-by-side comparison of two distinctly different micellar-polymer processes in the same field in order that the associated benefits and problems of each could be determined.

  10. Residential Energy Efficiency Demonstration: Hawaii and Guam Energy Improvement Technology Demonstration Project

    SciTech Connect

    Earle, L.; Sparn, B.; Rutter, A.; Briggs, D.

    2014-03-01

    In order to meet its energy goals, the Department of Defense (DOD) has partnered with the Department of Energy (DOE) to rapidly demonstrate and deploy cost-effective renewable energy and energy-efficiency technologies. The scope of this project was to demonstrate tools and technologies to reduce energy use in military housing, with particular emphasis on measuring and reducing loads related to consumer electronics (commonly referred to as 'plug loads'), hot water, and whole-house cooling.

  11. 38 CFR 21.390 - Rehabilitation research and special projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... higher learning, to carry out the provisions of paragraph (a) of this section. (Authority: 38 U.S.C. 3119(b)) (c) Research by Vocational Rehabilitation and Employment (VR&E) staff members. VA will encourage research by VR&E staff members. This research will address problems affecting service delivery,...

  12. SELENIUM TREATMENT/REMOVAL ALTERNATIVES DEMONSTRATION PROJECT - MINE WASTE TECHNOLOGY PROGRAM ACTIVITY III, PROJECT 20

    EPA Science Inventory

    This document is the final report for EPA's Mine WAste Technology Program (MWTP) Activity III, Project 20--Selenium Treatment/Removal Alternatives Demonstration project. Selenium contamination originates from many sources including mining operations, mineral processing, abandoned...

  13. SNOX flue gas cleaning demonstration project: A DOE assessment

    SciTech Connect

    2000-06-01

    The goal of the US Department of Energy (DOE) Clean Coal Technology (CCT) Program is to provide the energy marketplace with a suite of advanced, cost-effective, highly efficient, and environmentally responsible coal-utilization technologies through cooperatively implementing a series of demonstration projects with industry stake holders. These projects seek to establish at scale the commercial viability of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as DOE's post-project assessment of a project selected in CCT Round 2, SNOX{trademark} Flue Gas Cleaning Demonstration Project. DOE's participation in this project through Cooperative Agreement No. DE-FC22-90PC89655 is consistent with Public Law 100-202 as amended by Public Law 100-446. The SNOX process is a combination of catalytic processes that remove sulfur dioxide (SO{sub 2}), nitrogen oxides (NO{sub x}) and residual particulate matter (PM) from flue gas that has been pre-cleaned with particulate removal. The process generates salable sulfuric acid (H{sub 2}SO{sub 4}) meeting an industry wide standard (US Government Specification O-S-801E) from the SO{sub 2} and converts the NO{sub x} to harmless nitrogen and water vapor. The integrated design of the process enables high-pollutant-removal efficiencies, no significant waste production (only very low quantities of flue gas ash and catalyst degradation fines), and significant heat recovery potential that can be used in the commercial application of the technology to attain increased thermal efficiency of the system. The host site chosen for this CCT demonstration project was Ohio Edison's Niles Station located along the Mahoning River in Niles, Ohio, just northwest of Youngstown. There are two cyclone coal-fired, steam electricity-generating units at the plant. The performance objectives of this project were as follows: to demonstrate SO{sub 2}-removal efficiency greater than 95%; to

  14. NRC assessment of the Department of Energy annealing demonstration project

    SciTech Connect

    Jackson, D.A.; Malik, S.N.

    1997-02-01

    Thermal annealing is the only known method for mitigating the effects of neutron irradiation embrittlement in reactor pressure vessel (RPV) steels. In May 1996, the US Department of Energy (DOE) in conjunction with the American Society of Mechanical Engineers, Westinghouse, Cooperheat, Electric Power Research Institute (with participating utilities), Westinghouse Owner`s Group, Consumers Power, Electricite` de France, Duquesne Light and the Central Research Institute of the Electric Power Industry (Japan) sponsored an annealing demonstration project (ADP) at Marble Hill. The Marble Hill Plant, located in Madison, Indiana, is a Westinghouse 4 loop design. The plant was nearly 70% completed when the project was canceled. Hence, the RPV was never irradiated. The paper will present highlights from the NRCs independent evaluation of the Marble Hill Annealing Demonstration Project.

  15. AN OPTICAL CHARACTER RECOGNITION RESEARCH AND DEMONSTRATION PROJECT.

    ERIC Educational Resources Information Center

    1968

    RESEARCH AND DEVELOPMENT OF PROTOTYPE LIBRARY SYSTEMS WHICH UTILIZE OPTICAL CHARACTER RECOGNITION INPUT HAS CENTERED AROUND OPTICAL PAGE READERS AND DOCUMENT READERS. THE STATE-OF-THE-ART OF BOTH THESE OPTICAL SCANNERS IS SUCH THAT BOTH ARE ACCEPTABLE FOR LIBRARY INPUT PREPARATION. A DEMONSTRATION PROJECT UTILIZING THE TWO TYPES OF READERS, SINCE…

  16. Tidd PFBC Demonstration Project: Public final design report

    SciTech Connect

    Not Available

    1992-10-01

    This Public Final Design Report describes the 70 MW(e) Tidd PFBC Demonstration Plant under construction in Brilliant, Ohio. This project is receiving cost-sharing from the US Department of Energy (DOE), and is being administered by the Morgantown Energy Technology Center in accordance with DOE Cooperative Agreement No. DE-FC21-87 MC24132.000. The project is also receiving costsharing from the State of Ohio. This award is being administered by the Ohio Coal Development Office. The Tidd PFBC Demonstration Project is the first utility-scale demonstration project in the US. Its objective is to demonstrate that the Pressurized Fluidized Bed Combustion (PFBC) combined-cycle technology is an economic, reliable, and environmentally superior alternative to conventional technology in using high-sulfur coal to generate electricity. Detailed design of the plant began in May 1987, leading to the start of construction in April 1988. First coal fire occurred in November 1990, and the three-year test program began in February 1991.

  17. Report on George Brown College Multicultural Demonstration Project.

    ERIC Educational Resources Information Center

    Ward, Barbara

    This five-part report describes George Brown College's Multicultural Demonstration Project (MDP), which was developed to: (1) increase awareness of issues of multicultural change among senior managers at the college; (2) assist two departments to implement aspects of the college's Race and Ethnic Relations Policy and the recommendations of the…

  18. Inquiry Demonstration Project 1988-89. OREA Report.

    ERIC Educational Resources Information Center

    Mei, Dolores M.; And Others

    The 1988/89 New York City high school Inquiry Demonstration Project (IDP) met or surpassed its evaluation criteria. The IDP comprised the Urban Academy, a laboratory school serving high-risk students, and an on-site staff development program in seven high schools. The overall goal was to promote the use of the inquiry method in the classroom. The…

  19. Prioritization of Ecosystem Services Research: Tampa Bay Demonstration Project.

    EPA Science Inventory

    The Tampa Bay Ecosystem Services Demonstration Project (TBESDP) is a component of the U.S. Environmental Protection Agency’s Ecosystem Services Research Program. The principal objectives of TBESDP are (1) to quantify the ecosystem services of the Tampa Bay watershed, (2) to deter...

  20. In-place nuclear reactor vessel annealing demonstration project

    SciTech Connect

    Howell, D.

    1994-09-01

    The objective of this paper was a discussion of the proposed annealing demonstration project at the canceled Marble Hill-1 reactor. The discussion, which was a compilation of transparencies on the noted subject, included overall objectives, scope of work, staging of equipment, and analytical objectives. Current status, including funding was summarized.

  1. 76 FR 35864 - Proposed Priority; Special Demonstration Programs-National Technical Assistance Projects To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    ... of information on promising practices and knowledge from research on topics in the field of rehabilitation that have national significance and improve the performance of State vocational rehabilitation (VR... monitoring and assessments by RSA have demonstrated that State VR agencies and their partners, need...

  2. McIntosh Unit 4 PCFB demonstration project

    SciTech Connect

    Dodd, A.M.; Dryden, R.J.; Morehead, H.T.

    1997-12-31

    The City of Lakeland, Foster Wheeler Corporation and Westinghouse Electric Corporation have embarked on a utility scale demonstration of Pressurized Circulating Fluidized Bed (PCFB) technology at Lakeland`s McIntosh Power Station in Lakeland, Florida. The US Department of Energy will be providing approximately $195 million of funding for the project through two Cooperative Agreements under the auspices of the Clean Coal Technology Program. The project will involve the commercial demonstration of Foster Wheeler Pyroflow PCFB technology integrated with Westinghouse`s Hot Gas Filter (HGF) and power generation technologies. The total project duration will be approximately eight years and will be structured into three separate phases; two years of design and permitting, followed by an initial period of two years of fabrication and construction and concluding with a four year demonstration (commercial operation) period. It is expected that the project will show that Foster Wheeler`s Pyroflow PCFB technology coupled with Westinghouse`s HGF and power generation technologies represents a cost effective, high efficiency, low emissions means of adding greenfield generation capacity and that this same technology is also well suited for repowering applications.

  3. Interactive lecture demonstrations, active learning, and the ALOP project

    NASA Astrophysics Data System (ADS)

    Lakshminarayanan, Vasudevan

    2011-05-01

    There is considerable evidence from the physics education literature that traditional approaches are ineffective in teaching physics concepts. A better teaching method is to use the active learning environment, which can be created using interactive lecture demonstrations. Based on the active learning methodology and within the framework of the UNESCO mandate in physics education and introductory physics, the ALOP project (active learning in optics and photonics) was started in 2003, to provide a focus on an experimental area that is adaptable and relevant to research and educational conditions in many developing countries. This project is discussed in this paper.

  4. Habitat Demonstration Unit Project Leadership and Management Strategies

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and

  5. [Developing rehabilitation treatment groups for cardiology and orthopaedics -- findings of a research project].

    PubMed

    Ranneberg, J; Neubauer, G

    2005-02-01

    The call for a more specific and transparent service and reimbursement system for medical rehabilitation is not new. However, in practice, the idea was not followed up for a long time. This situation changed with the introduction of German Diagnosis Related Groups (DRGs) for acute care settings. It is now strongly being discussed whether such a sophisticated lump sum reimbursement system might also be a viable alternative in the field of rehabilitation. There still exist different opinions over the suitability of a lump sum-system for medical rehabilitation, but the main direction seems to be clear. There is no doubt that medical rehabilitation requires a needs-adapted, differentiated patient classification system. The benefits of such cost-homogeneous groups are evident. They support medical and management services and are suitable for both internal and external use. The main intent of the project presented was to develop such a patient classification system, adapted to the requirements of medical rehabilitation. The project concentrated on orthopaedic and cardiac rehabilitaton. For these two areas, needs-adapted and cost-homogeneous groups (RBG, Rehabilitationsbehandlungsgruppen - Rehabilitation Treatment Groups) were developed in order to adequately represent the underlying service portfolio and to act as a link between acute and post-acute care. In addition, severity level indicators were identified, in order to explain for different needs and resource volumes and in order to create severity-RBGs representing patients with the same severity level. Based on these groups, a needs-adapted lump sum reimbursement system can be developed, allowing for a differentiated service and cost controlling. The project described formed part of the Research Funding Programme Rehabilitation Sciences defrayed by the German Pension Insurance and the Federal Ministry for Education and Research. As part of the Freiburg/Bad Sackingen research network, it was realised at the

  6. SNOX demonstration project: Volume 1, Public design. Final report

    SciTech Connect

    1996-07-01

    The SNOX process, developed by Haldor Topsoe A/S and demonstrated and marketed in North America by ABB Environmental Systems (ABBES), is an innovative process which removes both sulfur dioxide and nitrogen oxides from power plant flue gases. Sulfur dioxide is recovered as high purity, concentrated sulfuric acid and nitrogen oxides are converted to nitrogen gas and water vapor; no additional waste streams are produced. As part of the Clean Coal Technology Program, this project was demonstrated under joint sponsorship from the US Department of Energy, Ohio Coal Development Office, ABBES, Snamprogetti, and Ohio Edison. The project objective was to demonstrate the SO{sub 2}/NO{sub x} reduction efficiencies of the SNOX process on an electric power plant firing high-sulfur Ohio Coal. A 35-MWe demonstration was conducted on a 108-MWe unit, Ohio Edison`s Niles Plant Unit 2, in Trumbull County, Ohio. The $31 million project began site preparation in November 1990 and commenced treating flue gas in March of 1992. Testing at the site concluded in December of 1994. This report presents a description of the technology and design criteria for the demonstration plant including modifications and additions to the Ohio Edison Niles Station Unit 2. Pertinent drawings and a complete list of drawings are provided for information and reference. In addition to design information, cost data is provided for the design and construction of the demonstration plant; and cost estimates are provided for startup and operating expenses of the demonstration unit. The influence of commercial site specific conditions on the design and economics of the technology are also discussed.

  7. 33 CFR 165.T01-1130 - Regulated Navigation Area; S99 Alford Street Bridge rehabilitation project, Mystic River, MA.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Alford Street Bridge rehabilitation project, Mystic River, MA. 165.T01-1130 Section 165.T01-1130... Street Bridge rehabilitation project, Mystic River, MA. (a) Location. The following area is a Regulated... to bottom, within 100 yards of any point on the S99 Alford Street Bridge. (b) Regulations. (1)...

  8. Rehabilitation Training Program and Special Capacity Building Program, 1997-1998: Catalog of Projects under the Rehabilitation Services Administration.

    ERIC Educational Resources Information Center

    Office of Special Education and Rehabilitative Services (ED), Washington, DC.

    This directory lists programs funded by rehabilitation training grants funded under the Rehabilitation Act of 1973 (Section 304a). These programs are grouped under the following categories: (1) rehabilitation long-term training; (2) experimental and innovative training; (3) state vocational rehabilitation unit in-service training; (4)…

  9. FISCHER-TROPSCH FUELS PRODUCTION AND DEMONSTRATION PROJECT

    SciTech Connect

    Stephen P. Bergin

    2003-04-23

    This project has two primary purposes: (1) Build a small-footprint (SFP) fuel production plant to prove the feasibility of this relatively transportable technology on an intermediate scale (i.e. between laboratory-bench and commercial capacity) and produce as much as 150,000 gallons of hydrogen-saturated Fischer-Tropsch (FT) diesel fuel; and (2) Use the virtually sulfur-free fuel produced to demonstrate (over a period of at least six months) that it can not only be used in existing diesel engines, but that it also can enable significantly increased effectiveness and life of the next-generation exhaust-after-treatment emission control systems that are currently under development and that will be required for future diesel engines. Furthermore, a well-to-wheels economic analysis will be performed to characterize the overall costs and benefits that would be associated with the actual commercial production, distribution and use of such FT diesel fuel made by the process under consideration, from the currently underutilized (or entirely un-used) energy resources targeted, primarily natural gas that is stranded, sub-quality, off-shore, etc. During the first year of the project, which is the subject of this report, there have been two significant areas of progress: (1) Most of the preparatory work required to build the SFP fuel-production plant has been completed, and (2) Relationships have been established, and necessary project coordination has been started, with the half dozen project-partner organizations that will have a role in the fuel demonstration and evaluation phase of the project. Additional project tasks directly related to the State of Alaska have also been added to the project. These include: A study of underutilized potential Alaska energy resources that could contribute to domestic diesel and distillate fuel production by providing input energy for future commercial-size SFP fuel production plants; Demonstration of the use of the product fuel in a heavy

  10. FINDING SOLUTIONS AT THE WEST VALLEY DEMONSTRATION PROJECT

    SciTech Connect

    Drake, John L.; Gramling, James M.; Houston, Helene M.

    2003-02-27

    The United States Department of Energy Office of Environmental Management (DOE-EM) faces a number of sizeable challenges as it begins to transform its mission from managing risk to reducing and eliminating risk throughout the DOE Complex. One of the greatest challenges being addressed by DOE-EM as this transformation takes place is accelerating the deactivation and decommissioning of thousands of facilities within the DOE Complex that were once used to support nuclear-related programs and projects. These facilities are now unused and aging. Finding solutions to complete the cleanup of these aging facilities more safely, efficiently, and effectively while reducing costs is critical to successfully meeting DOE-EM's cleanup challenge. The Large-Scale Demonstration and Deployment Project (LSDDP) of Hot Cells at the West Valley Demonstration Project (WVDP) is a near-term project funded through the DOE's National Energy Technology Laboratory (DOE-NETL) for the specific purpose of identifying, evaluating, demonstrating, and deploying commercially available technologies that are capable of streamlining the cleanup of hot cells in unused facilities while improving worker safety. Two DOE project sites are participating in this LSDDP: the WVDP site in West Valley, New York and the Hanford River Corridor Project (RCP) site in Richland, Washington. The WVDP site serves as the host site for the project. Technologies considered for demonstration and potential deployment at both LSDDP sites are targeted for application in hot cells that require the use of remote and semi-remote techniques to conduct various cleanup-related activities because of high radiation or high contamination levels. These hot cells, the type of cleanup activities being conducted, and technologies selected for demonstration are the main topics discussed in this paper. The range of cleanup-related activities addressed include in-situ characterization, size-reduction, contamination control, decontamination, in

  11. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and teacher training projects? 461.33 Section 461.33 Education Regulations of the Offices of the...? § 461.33 What are special experimental demonstration projects and teacher training projects? (a) In... personnel in programs designed to carry out the purposes of the Act; and (ii) Training professional...

  12. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and teacher training projects? 461.33 Section 461.33 Education Regulations of the Offices of the...? § 461.33 What are special experimental demonstration projects and teacher training projects? (a) In... personnel in programs designed to carry out the purposes of the Act; and (ii) Training professional...

  13. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and teacher training projects? 461.33 Section 461.33 Education Regulations of the Offices of the...? § 461.33 What are special experimental demonstration projects and teacher training projects? (a) In... personnel in programs designed to carry out the purposes of the Act; and (ii) Training professional...

  14. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and teacher training projects? 461.33 Section 461.33 Education Regulations of the Offices of the...? § 461.33 What are special experimental demonstration projects and teacher training projects? (a) In... personnel in programs designed to carry out the purposes of the Act; and (ii) Training professional...

  15. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and teacher training projects? 461.33 Section 461.33 Education Regulations of the Offices of the...? § 461.33 What are special experimental demonstration projects and teacher training projects? (a) In... personnel in programs designed to carry out the purposes of the Act; and (ii) Training professional...

  16. PROJECT RE-ED, A DEMONSTRATION PROJECT FOR THE REEDUCATION OF EMOTIONALLY DISTURBED CHILDREN.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Mental Health, Raleigh.

    THE PROJECT FOR THE REEDUCATION OF EMOTIONALLY DISTURBED CHILDREN (PROJECT RE-ED), A DEMONSTRATION PROJECT (1961-1968) TO DEVELOP AND EVALUATE THE EFFECTIVENESS OF RESIDENTIAL SCHOOLS (SUNDAY THROUGH FRIDAY) FOR DISTURBED CHILDREN, IS DESCRIBED. THE PROFESSIONAL TRAINING AT GEORGE PEABODY COLLEGE, TENNESSEE, AND USE OF CAREFULLY SELECTED…

  17. Childhood Obesity Research Demonstration Project: Cross-Site Evaluation Methods

    PubMed Central

    Lee, Rebecca E.; Mehta, Paras; Thompson, Debbe; Bhargava, Alok; Carlson, Coleen; Kao, Dennis; Layne, Charles S.; Ledoux, Tracey; O'Connor, Teresia; Rifai, Hanadi; Gulley, Lauren; Hallett, Allen M.; Kudia, Ousswa; Joseph, Sitara; Modelska, Maria; Ortega, Dana; Parker, Nathan; Stevens, Andria

    2015-01-01

    Abstract Introduction: The Childhood Obesity Research Demonstration (CORD) project links public health and primary care interventions in three projects described in detail in accompanying articles in this issue of Childhood Obesity. This article describes a comprehensive evaluation plan to determine the extent to which the CORD model is associated with changes in behavior, body weight, BMI, quality of life, and healthcare satisfaction in children 2–12 years of age. Design/Methods: The CORD Evaluation Center (EC-CORD) will analyze the pooled data from three independent demonstration projects that each integrate public health and primary care childhood obesity interventions. An extensive set of common measures at the family, facility, and community levels were defined by consensus among the CORD projects and EC-CORD. Process evaluation will assess reach, dose delivered, and fidelity of intervention components. Impact evaluation will use a mixed linear models approach to account for heterogeneity among project-site populations and interventions. Sustainability evaluation will assess the potential for replicability, continuation of benefits beyond the funding period, institutionalization of the intervention activities, and community capacity to support ongoing program delivery. Finally, cost analyses will assess how much benefit can potentially be gained per dollar invested in programs based on the CORD model. Conclusions: The keys to combining and analyzing data across multiple projects include the CORD model framework and common measures for the behavioral and health outcomes along with important covariates at the individual, setting, and community levels. The overall objective of the comprehensive evaluation will develop evidence-based recommendations for replicating and disseminating community-wide, integrated public health and primary care programs based on the CORD model. PMID:25679060

  18. Expedited technology demonstration project final report: final forms

    SciTech Connect

    Hopper, R W

    1999-05-01

    ETDP Final Forms was an attempt to demonstrate the fabrication and performance of a ceramic waste form immobilizing the hazardous and radioactive elements of the MSO/SR mineral residues. The ceramic material had been developed previously. The fabrication system was constructed and functioned as designed except for the granulator. Fabrication of our particular ceramic, however, proved unsatisfactory. The ceramic material design was therefore changed toward the end of the project, replacing nepheline with zircon as the sink for silica. Preliminary results were encouraging, but more development is needed. Fabrication of the new ceramic requires major changes in the processing: Calcination and granulation would be replaced by spray drying; and sintering would be at higher temperature. The main goal of the project--demonstrating the fabrication and performance of the waste form--was not achieved. This report summarizes Final Forms' activities. The problem of immobilizing the MSO/SR mineral residues is discussed.

  19. Overview of the MARS Laser Communications Demonstration Project

    NASA Technical Reports Server (NTRS)

    Edward, Bernard L.; Townes, Stephen A.; Bondurant, Roy S.; Scozzafava, Joseph J.; Boroson, Don M.; Parvin, Ben A.; Biswas, Abhijit; Pillsbury, Alan D.; Khatri, Farzana I.; Burnside, Jamie W.

    2003-01-01

    This paper provides an overview of the Mars Laser Communications Demonstration Project, a joint project between NASA s Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory, California Institute of Technology (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MIT/LL). It reviews the strawman designs for the flight and ground segments, the critical technologies required, and the concept of operations. It reports preliminary conclusions from the Mars Lasercom Study conducted at MIT/LL and on additional work done at JPL and GSFC. The lasercom flight terminal will be flown on the Mars Telecom Orbiter (MTO) to be launched by NASA in 2009, and will demonstrate a technology which has the potential of vastly improving NASA s ability to communicate throughout the solar system.

  20. Advanced Coal Conversion Process Demonstration Project. Environmental Monitoring Plan

    SciTech Connect

    Not Available

    1992-04-01

    Western Energy Company (WECO) was selected by the Department of Energy (DOE) to demonstrate the Advanced Coal Conversion Process (ACCP) which upgrades low rank coals into high Btu, low sulfur, synthetic bituminous coal. As specified in the Corporate Agreement, RSCP is required to develop an Environmental Monitoring Plan (EMP) which describes in detail the environmental monitoring activities to be performed during the project execution. The purpose of the EMP is to: (1) identify monitoring activities that will be undertaken to show compliance to applicable regulations, (2) confirm the specific environmental impacts predicted in the National Environmental Policy Act documentation, and (3) establish an information base of the assessment of the environmental performance of the technology demonstrated by the project. The EMP specifies the streams to be monitored (e.g. gaseous, aqueous, and solid waste), the parameters to be measured (e.g. temperature, pressure, flow rate), and the species to be analyzed (e.g. sulfur compounds, nitrogen compounds, trace elements) as well as human health and safety exposure levels. The operation and frequency of the monitoring activities is specified, as well as the timing for the monitoring activities related to project phase (e.g. preconstruction, construction, commissioning, operational, post-operational). The EMP is designed to assess the environmental impacts and the environmental improvements resulting from construction and operation of the project.

  1. Rod consolidation at the West Valley Demonstration Project

    SciTech Connect

    Bailey, W.J.

    1986-12-01

    A rod consolidation demonstration with irradiated pressurized water reactor fuel was recently conducted by personnel from Nuclear Assurance Corporation and West Valley Nuclear Services Company at the West Valley Demonstration Project in West Valley, New York. The rod consolidation demonstration involved pulling all of the fuel rods from six fuel Assemblies. In general, the rod pulling proceeded smoothly. The highest compaction ratio attained was 1:8:1. Among the total of 1074 fuel rods were some known degraded rods (they had collapsed cladding, a result of in-reactor fuel densification), but no rods were broken or dropped during the demonstration. One aim was to gather information on the effect of rod consolidation operations on the integrity of the fuel rods during subsequent handling and storage. Another goal was to collect information on the condition and handling of intact, damaged, and failed fuel that has been in storage for an extended period. 9 refs., 8 figs., 1 tab.

  2. NASA lunar surface habitat and remote exploration demonstration project

    NASA Astrophysics Data System (ADS)

    Clearwater, Yvonne A.

    1992-07-01

    The Human Exploration Demonstration Project (HEDP) conducted by the NASA Ames Research Center to develop technological integration and demonstration capabilities for lunar and Mars space missions is described. The development of safe, effective, and reliable systems requires that independently engineered subsystems be fully integrated and tested under realistic conditions. The primary objective of the HEDP is demonstration of various aspects of human exploration and habitation on extraterrestrial surfaces. Some of the technologies to be demonstrated are also applicable to unmanned precursor mission functions. It is concluded that the HEDP will provide a unique opportunity to address a broad spectrum of advanced mission operations by bridging between the early requirements for robotic systems with control at earth-based workstations.

  3. Case studies for GSHP demonstration projects in the US

    DOE PAGES

    Liu, Xiaobing; Malhotra, Mini; Im, Piljae

    2015-07-01

    Under the American Recovery and Reinvestment Act , twenty-six ground source heat pump (GSHP) projects were competitively selected and carried out to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. This article gives an overview of the case studies for six of the systems. These case studies evaluated efficiencies, energy savings, and costs of the demonstrated systems. In addition, it was found that more energy savings could be achieved if controls of GSHP system are improved.

  4. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. 1990 Annual report

    SciTech Connect

    Not Available

    1992-02-01

    The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

  5. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    SciTech Connect

    Stottler, Gary

    2012-02-08

    General Motors, LLC and energy partner Shell Hydrogen, LLC, deployed a system of hydrogen fuel cell electric vehicles integrated with a hydrogen fueling station infrastructure to operate under real world conditions as part of the U.S. Department of Energy's Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project. This technical report documents the performance and describes the learnings from progressive generations of vehicle fuel cell system technology and multiple approaches to hydrogen generation and delivery for vehicle fueling.

  6. Demonstration Erosion Control Project Monitoring Program. Fiscal Year 1994 Report.

    DTIC Science & Technology

    1996-12-01

    Technical Report HL-96-22 December 1996 US Army Corps of Engineers Waterways Experiment Station Demonstration Erosion Control Project...C. Watson, Colorado State University Approved For Public Release; Distribution Is Unlimited 19970520 143 Prepared for U.S. Army Engineer District...Derrick, Billy E. Johnson, Michael J. Trawle U.S. Army Corps of Engineers Waterways Experiment Station 3909 Halls Ferry Road Vicksburg, MS 39180

  7. The development of a psychiatric rehabilitation service: a two year pilot project.

    PubMed

    Moss, E; Davidson, S

    1980-01-01

    In the history of psychiatry, one can discern conflicting trends with regard to hospitalization of people suffering from severe mental disturbances. From the beginning of the 19th century, the standard method for dealing with such people has been to take them away from their homes and work and put them in hospitals. However, since the discovery of antipsychotic drugs in the 1950's, there has developed a new movement to treat mentally disturbed people in their communities, either avoiding hospitalization altogether, or at least greatly shortening it. In many hospitals there has been a synthesis of these two trends, reflected in an upgrading of the importance of the rehabilitation function. In Shalvata Psychiatric Center, a medium-sized psychiatric hospital in Hod Hasharon, Israel, a two-year pilot project to introduce a centralized Rehabilitation Service was recently completed. The present Rehabilitation Service is based on the rehabilitation/activity therapy model in which the hospital is conceptualized as a setting in which patients may develop or recover social and vocational skills needed to function adequately in the community. It has drawn on existing, motivated staff from all mental health professions represented at the hospital, and works closely with all in-hospital wards and the day hospital. The authors discuss six areas of vocational and social rehabilitation with which the Rehabilitation Service has attempted to deal: 1. activity therapy/rehabilitation groups, 2. vocational guidance unit, 3. after-care therapeutic social club, 4. in-hospital rehabilitation consultation, 5. liaison activities with community-based facilities, 6. job placement.

  8. Vermont Rural and Farm Family Rehabilitation Project. A Benchmark Report. Research Report MP73.

    ERIC Educational Resources Information Center

    Tompkins, E. H.; And Others

    The report presents information about client families and their farms during their contact with the Vermont Rural and Farm Family Rehabilitation (RFFR) project from March 1, 1969 to June 30, 1971. Data are from 450 family case histories which include 2,089 members. Most were from northern Vermont. Families averaged 4.64 persons each, about 1 more…

  9. 77 FR 37025 - Final Priority: Disability Rehabilitation Research Project-Burn Model Systems Centers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... attention on areas of national need. DATES: Effective Date: This priority is effective July 20, 2012. [[Page... appropriate to allow the group of BMS project directors to determine whether they will incorporate a measure.... Section 21 of the Rehabilitation Act specifically mentions groups of racial and ethnic minorities...

  10. A Survey of Current and Projected Ethical Dilemmas of Rehabilitation Counselors

    ERIC Educational Resources Information Center

    Hartley, Michael T.; Cartwright, Brenda Y.

    2016-01-01

    Purpose: This study surveyed current and projected ethical dilemmas of rehabilitation counselors. Method: As a mixed-methods approach, the study used both quantitative and qualitative analyses. Results: Of the 211 participants who completed the survey, 116 (55.0%) reported an ethical dilemma. Based on the descriptions, common themes involved roles…

  11. Environmental Assessment: Conestoga Reservoir Maintenance and Aquatic Habitat Rehabilitation Project Lancaster County, Nebraska

    DTIC Science & Technology

    2014-06-01

    Reservoir Rehabilitation Project U.S. Army Corps of Engineers June 2014 ii Omaha District 3.4.3.1.1. Western Prairie Fringed Orchid ...4-6 4.2.3.1.1. Western Prairie Fringed Orchid ...Beetle Endangered Saline wetlands Platanthera praeclara Western Prairie Fringed Orchid Threatened Wet prairies and sedge meadows Grus americana

  12. Reducing Stress within the Rehabilitative Work Setting - A Report on the ROSE Project

    NASA Astrophysics Data System (ADS)

    Wells, John S. G.; Denny, Margaret

    Reducing Occupational Stress in Employment (ROSE) is an EU funded project which aims to develop a combined person and work directed stress management programme in order to improve the long-term retention of staff in the vocational rehabilitation sector for mental health and intellectual disabilities.

  13. 77 FR 480 - Applications for New Awards; Disability and Rehabilitation Research Projects and Centers Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-05

    ...) Technology; (4) Employment; or (5) Demographics. 3. Submission Dates and Times: Applications Available... Available: January 5, 2012. Deadline for Transmittal of Applications: March 5, 2012. Full Text of...) Projects program is to develop methods, procedures, and rehabilitation technology that maximize the...

  14. NASA systems autonomy demonstration project: Advanced automation demonstration of Space Station Freedom thermal control system

    NASA Technical Reports Server (NTRS)

    Dominick, Jeffrey; Bull, John; Healey, Kathleen J.

    1990-01-01

    The NASA Systems Autonomy Demonstration Project (SADP) was initiated in response to Congressional interest in Space station automation technology demonstration. The SADP is a joint cooperative effort between Ames Research Center (ARC) and Johnson Space Center (JSC) to demonstrate advanced automation technology feasibility using the Space Station Freedom Thermal Control System (TCS) test bed. A model-based expert system and its operator interface were developed by knowledge engineers, AI researchers, and human factors researchers at ARC working with the domain experts and system integration engineers at JSC. Its target application is a prototype heat acquisition and transport subsystem of a space station TCS. The demonstration is scheduled to be conducted at JSC in August, 1989. The demonstration will consist of a detailed test of the ability of the Thermal Expert System to conduct real time normal operations (start-up, set point changes, shut-down) and to conduct fault detection, isolation, and recovery (FDIR) on the test article. The FDIR will be conducted by injecting ten component level failures that will manifest themselves as seven different system level faults. Here, the SADP goals, are described as well as the Thermal Control Expert System that has been developed for demonstration.

  15. The West Valley Demonstration Project's vitrification system operating experience

    SciTech Connect

    Pope, J.M.; Barnes, S.M.

    1989-01-01

    A full-sized, integrated vitrification system is being tested at the West Valley Demonstration Project (WVDP) to establish its operational characteristics that will allow a quality, high-level nuclear waste (HLW) glass product to be consistently produced. Recently, this nonradioactive verification testing has emphasized (a) ensuring flow sheet and feed makeup chemistry that enables well-balanced melter performance, (b) achieving design basis melter throughput rates at steady-state operating conditions, and (c) demonstrating that the release limit of NO{sub x} is met by the vitrification off-gas system. The West Valley vitrification process testing is rapidly converging to demonstrate that the acceptance specification in the glass product and the environmental requirements on the off-gas will indeed be met, thereby providing the basis for approval to begin radioactive operations in 1992.

  16. Geothermal heating demonstration project at Mammoth Lakes Village. Final report

    SciTech Connect

    Sims, A.V.; Campbell, R.G.

    1980-03-01

    A pilot project is described which demonstrated the feasibility of using geothermal energy for space heating and snow-melting at the Casa Diablo geothermal reservoir near Mammoth Lakes Village, California. The geothermal heating system employed was modeled after the geothermal district heating system used extensively in Iceland. The geothermal heating system incorporated a closed secondary heating loop (Iceland's system uses the geothermal fluids directly) to provide heat to a lumber store, warehouse and display area, and to melt snow on a connecting walkway between the buildings. The secondary loop, containing a mixture of fresh water and ethylene glycol, was heated by geothermal fluids produced from a nearby well. After passing through a heat exchanger, the cooled geothermal fluids were reinjected down another well. The heating system operated for three different periods, and the project concluded after a successful, long-term demonstration of well pump and heating system operation. Pump problems encountered early in the project were solved, and information gained in the final operation period indicated that reliable, extended periods of well pump operation can be achieved. The hydronic heaters effectively heated buildings, and the snow-melting walkway performed very well during winter operation.

  17. Michigan Oncology Medical Home Demonstration Project: first-year results.

    PubMed

    Kuntz, Gordon; Tozer, Jane M; Snegosky, Jeff; Fox, John; Neumann, Kurt

    2014-09-01

    Launched in May 2012, the Michigan Oncology Medical Home Demonstration Project is an innovative multipractice oncology medical home model supported by payment reform. In the first year of the project, four oncology practices (29 physicians) participated and enrolled 85 patients receiving chemotherapy for a cancer diagnosis (96 new chemotherapy starts). By creating an oncology medical home for patients, the project reduced costs associated with unnecessary emergency room visits and inpatient admissions, with an average estimated cost savings of $550 per patient, while also enhancing payments to providers. The total estimated cost savings for year 1 was $46,228. In addition to the financial savings realized through reductions in emergency room visits and hospitalizations, the program also demonstrated that participating practices had high adherence to national and practice-selected guidelines, instituted advance care planning, and provided effective and standardized symptom management. The results are promising and provide evidence that community oncology practices will embrace the transformation to a patient-centered model with properly aligned incentives and administrative assistance.

  18. Demonstration project number 39, hot mix recycling, Gray County, Kansas

    NASA Astrophysics Data System (ADS)

    Maag, R. G.; Parcells, W. H., Jr.

    1983-01-01

    The objective of this demonstration project was to evaluate the hot mix recycling process as a method of renovating a badly cracked and otherwise deteriorated section of road mixed bituminous paving in southwestern Kansas. The equipment used on the project included a cold milling machine to reclaim the upper portion of existing pavement; a drum dryer hot mix plant modified to process the material; and other standard hot mix laydown and compaction machines. Energy consumption comparisons in equivalent gallons of fuel indicate a savings of 17.8% when the recycled method is compared to using all new aggregate. The energy savings is primarily due to less asphaltic cement required and less fuel needed to mill and reuse the existing pavement than to quarry and haul in an equivalent quantity of new aggregate.

  19. Demonstrating Robotic Autonomy in NASA's Intelligent Systems Project

    NASA Technical Reports Server (NTRS)

    Morris, Robert; Smith, Ben; Estlin, Tara; Pedersen, Liam

    2004-01-01

    This paper will provide an overview of NASA's investments in autonomy during the past five years within the Intelligent Systems Project, with particular attention paid to investments that have resulted in mission infusion of autonomy technology, in particular, into the recent Mars Exploration Rover (MER) mission. The content of the paper will be divided into two primary topic areas: a technical overview of the component technologies developed under the program, and a programmatic overview of the history and organization of the NASA IS project itself, with a focus on describing the program elements related to autonomy and intelligent robotics. The paper will also provide an overview of the September 2004 autonomy demonstrations, including a discussion of objectives, organization, and preliminary results (to the extent they are available before the submission deadline).

  20. West Valley Demonstration Project annual report to Congress

    SciTech Connect

    Not Available

    1990-01-01

    By the end of the fiscal year, the West Valley Demonstration Project had processed 757,000 litres of liquid high-level waste, removing most of the radioactive constituents by ion exchange. The radioactive ion exchange material is being stored in an underground tank pending its incorporation, along with sludge still in the tank, into borosilicate glass. The decontaminated salt solution was solidified into a cement low-level waste form which has been reviewed and endorsed by the Nuclear Regulatory Commission. Five tests of the waste glass melter system were completed. A Notice of Intent was published to prepare a joint federal/state Environmental Impact Statement. Design of the Vitrification Facility, a major milestone, was completed and construction of the facility enclosure has begun. A Department of Energy Tiger Team and Technical Safety Appraisal of the Project found no undue risks to worker or public health and safety or the environment.

  1. Diesel fueled ship propulsion fuel cell demonstration project

    SciTech Connect

    Kumm, W.H.

    1996-12-31

    The paper describes the work underway to adapt a former US Navy diesel electric drive ship as a 2.4 Megawatt fuel cell powered, US Coast Guard operated, demonstrator. The Project will design the new configuration, and then remove the four 600 kW diesel electric generators and auxiliaries. It will design, build and install fourteen or more nominal 180 kW diesel fueled molten carbonate internal reforming direct fuel cells (DFCs). The USCG cutter VINDICATOR has been chosen. The adaptation will be carried out at the USCG shipyard at Curtis Bay, MD. A multi-agency (state and federal) cooperative project is now underway. The USCG prime contractor, AEL, is performing the work under a Phase III Small Business Innovation Research (SBIR) award. This follows their successful completion of Phases I and II under contract to the US Naval Sea Systems (NAVSEA) from 1989 through 1993 which successfully demonstrated the feasibility of diesel fueled DFCs. The demonstrated marine propulsion of a USCG cutter will lead to commercial, naval ship and submarine applications as well as on-land applications such as diesel fueled locomotives.

  2. Hudson River PCB reclamation demonstration project, New York

    SciTech Connect

    Not Available

    1982-11-01

    An abstract of the final environmental impact statement (EIS) for a demonstration project to dredge Hudson River sediments to remove polychlorinated biphenyl (PCB) contamination describes an effort to reduce the 40 hot spots by half. Positive impacts would be the removal of potential health hazards, but there is a risk that the dredging operations will release some contaminants into the surrounding water, leaving PCBs in the water and no longer contained. The Federal Water Pollution Control Act of 1972 is the legal mandate for the EIS.

  3. Photovoltaic test and demonstration project. [residential energy program

    NASA Technical Reports Server (NTRS)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The considered project consists of three subprojects related to applications, device performance and diagnostics, and endurance testing. The objectives of the applications subproject include the determination of the operating characteristics for a variety of photovoltaic conversion systems. A system test facility is being constructed in this connection and a prototype residence experiment is to be conducted. Market demand for solar cells is to be stimulated by demonstrating suitability of solar cells for specific near-term applications. Activities conducted in connection with device performance studies and diagnostics are also discussed along with developments in the area of endurance testing.

  4. Use of coal ash in highway construction: Georgia demonstration project

    SciTech Connect

    Larrimore, C.L.; Pike, C.W.

    1987-06-01

    EPRI has initiated a program designed to promote ash utilization in roadways, embankments, and backfills - potentially large volume application areas. Included within the EPRI program is a Georgia study involving the development and construction of a demonstration project in which several types of ash were used as major components in highway pavement construction. The primary objective is to plan, design, build and monitor the structural and environmental aspects of a full-scale application of ash in a highway pavement. All planning, design, and construction activities are completed and have been fully described in this report. Both structural and environmental monitorings are in progress and will be reported at the conclusion of study.

  5. York County Energy Partners DOE CCI ACFB demonstration project

    SciTech Connect

    Wang, S. ); Cox, J.; Parham, D. )

    1992-01-01

    The York County Energy Partners (YCEP) project, to be located in York County, Pennsylvania, will demonstrate the world's largest atmospheric circulating fluidized bed boiler under sponsorship of the US Department of Energy's Clean Coal Technology I Program. The single ACFB boiler, designed by Foster Wheeler Energy Corporation, will produce 227 MWe of net electrical power and export approximately 50,000 lb/hr of steam. This paper explains how the technical challenges to the design of a utility-scale ACFB boiler were met and presents the innovative features of this design.

  6. York County Energy Partners DOE CCI ACFB demonstration project

    SciTech Connect

    Wang, S.; Cox, J.; Parham, D.

    1992-09-01

    The York County Energy Partners (YCEP) project, to be located in York County, Pennsylvania, will demonstrate the world`s largest atmospheric circulating fluidized bed boiler under sponsorship of the US Department of Energy`s Clean Coal Technology I Program. The single ACFB boiler, designed by Foster Wheeler Energy Corporation, will produce 227 MWe of net electrical power and export approximately 50,000 lb/hr of steam. This paper explains how the technical challenges to the design of a utility-scale ACFB boiler were met and presents the innovative features of this design.

  7. North Village Ground Source Heat Pump Demonstration Project

    SciTech Connect

    Redderson, Jeff

    2015-08-03

    This project demonstrated the feasibility of converting from a traditional direct exchange system to a ground source heat pump system on a large scale, multiple building apartment complex on a university campus. A total of ten apartment buildings were converted using vertical well fields and a ground source loop that connected the 24 apartments in each building into a common system. The system has yielded significant operational savings in both energy and maintenance and transformed the living environments of these residential buildings for our students.

  8. West Valley Demonstration Project site environmental report, calendar year 1999

    SciTech Connect

    None Available

    2000-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1999 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  9. Waste Form Qualification Experience at the West Valley Demonstration Project

    SciTech Connect

    Palmer, R.A.; Misercola, A.J.

    2003-02-24

    Since 1996, the West Valley Demonstration Project (WVDP) has operated a slurry-fed ceramic melter to vitrify high-level nuclear waste (HLW) for the U.S. Department of Energy (DOE). More than 65 batches of HLW were mixed with glass-forming chemicals between June 1996 and August 2002 to make a ''qualified'' HLW form. The nuances of this procedure and the lessons learned from the application of the process will be provided in this paper to guide future producers of immobilized HLW.

  10. West Valley Demonstration Project site environmental report, calendar year 1997

    SciTech Connect

    1998-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1997 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  11. West Valley Demonstration Project site environmental report calendar year 1998

    SciTech Connect

    1999-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1998 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  12. "Dance and go on": a project of psychosocial rehabilitation on the road.

    PubMed

    Tavormina, Romina; Tavormina, Maurilio Giuseppe Maria; Nemoianni, Eugenio

    2015-09-01

    The project "Dance and go on" was created with the intention of bringing out of the Day Centre of the Department of Mental Health of Torre del Greco, the dance group "Dance That you go" active since 2009. Dancing Bachata becomes a rehabilitation tool to express emotions through the body and to open to the outside, on the territory (local society), overcoming the fear of being judged by others, the prejudice and the social stigma about mental illness. The rehabilitation activities of the dancing group allowed patients to improve their care of self, self-esteem, confidence in their capacities and an increase in their social relations. The strength and cohesion of the rehabilitation group has given to the patients the opportunity to believe in their own abilities, to accept themselves with their difficulties and to improve the relationship with their body in relation with each other.

  13. Missouri Soybean Association Biodiesel Demonstration Project: Final Report

    SciTech Connect

    Ludwig, Dale; Hamilton, Jill

    2011-10-27

    The Missouri Soybean Association (MSA) and the National Biodiesel Board (NBB) partnered together to implement the MSA Biodiesel Demonstration project under a United States Department of Energy (DOE) grant. The goal of this project was to provide decision makers and fleet managers with information that could lead to the increased use of domestically produced renewable fuels and could reduce the harmful impacts of school bus diesel exhaust on children. This project was initiated in September 2004 and completed in April 2011. The project carried out a broad range of activities organized under four areas: 1. Petroleum and related industry education program for fuel suppliers; 2. Fleet evaluation program using B20 with a Missouri school district; 3. Outreach and awareness campaign for school district fleet managers; and 4. Support of ongoing B20 Fleet Evaluation Team (FET) data collection efforts with existing school districts. Technical support to the biodiesel industry was also provided through NBB’s Troubleshooting Hotline. The hotline program was established in 2008 to troubleshoot fuel quality issues and help facilitate smooth implementation of the RFS and is described in greater detail under Milestone A.1 - Promote Instruction and Guidance on Best Practices. As a result of this project’s efforts, MSA and NBB were able to successfully reach out to and support a broad spectrum of biodiesel users in Missouri and New England. The MSA Biodiesel Demonstration was funded through a FY2004 Renewable Energy Resources Congressional earmark. The initial focus of this project was to test and evaluate biodiesel blends coupled with diesel oxidation catalysts as an emissions reduction technology for school bus fleets in the United States. The project was designed to verify emissions reductions using Environmental Protection Agency (EPA) protocols, then document – with school bus fleet experience – the viability of utilizing B20 blends. The fleet experience was expected to

  14. Nucla circulating atmospheric fluidized bed demonstration project. Final report

    SciTech Connect

    Not Available

    1991-10-01

    Colorado-Ute Electric Association began a study to evaluate options for upgrading and extending the life of its Nucla power station in 1982. Located in southwestern Colorado near the town of Nucla, this station was commissioned in 1959 with a local bituminous coal as its design fuel for three identical stoker-fired units, each rated at 12.6 MW(e). Poor station efficiency, high fuel costs, and spiraling boiler maintenance costs forced the Nucla Station into low priority in the CUEA dispatch order as early as 1981. Among the options CUEA considered was to serve as a host utility to demonstrate Atmospheric Fluidized Bed Combustion (AFBC) technology. The anticipated environmental benefits and apparent attractive economics of a circulating AFBC led to Colorado-Ute`s decision to proceed with the design and construction of a demonstration project in 1984 at the Nucla facility.

  15. Texas LPG fuel cell development and demonstration project

    SciTech Connect

    None, None

    2004-07-26

    The State Energy Conservation Office has executed its first Fuel Cell Project which was awarded under a Department of Energy competitive grant process. The Texas LPG Fuel Processor Development and Fuel Cell Demonstration Program is a broad-based public/private partnership led by the Texas State Energy Conservation Office (SECO). Partners include the Alternative Fuels Research and Education Division (AFRED) of the Railroad Commission of Texas; Plug Power, Inc., Latham, NY, UOP/HyRadix, Des Plaines, IL; Southwest Research Institute (SwRI), San Antonio, TX; the Texas Natural Resource Conservation Commission (TNRCC), and the Texas Department of Transportation (TxDOT). The team proposes to mount a development and demonstration program to field-test and evaluate markets for HyRadix's LPG fuel processor system integrated into Plug Power's residential-scale GenSys(TM) 5C (5 kW) PEM fuel cell system in a variety of building types and conditions of service. The program's primary goal is to develop, test, and install a prototype propane-fueled residential fuel cell power system supplied by Plug Power and HyRadix in Texas. The propane industry is currently funding development of an optimized propane fuel processor by project partner UOP/HyRadix through its national checkoff program, the Propane Education and Research Council (PERC). Following integration and independent verification of performance by Southwest Research Institute, Plug Power and HyRadix will produce a production-ready prototype unit for use in a field demonstration. The demonstration unit produced during this task will be delivered and installed at the Texas Department of Transportation's TransGuide headquarters in San Antonio, Texas. Simultaneously, the team will undertake a market study aimed at identifying and quantifying early-entry customers, technical and regulatory requirements, and other challenges and opportunities that need to be addressed in planning commercialization of the units. For further

  16. Ride 2 Recovery's Project HERO: using cycling as part of rehabilitation.

    PubMed

    Springer, Barbara A

    2013-05-01

    Ride 2 Recovery was founded in 2008 by a former world-class cycling competitor and coach to enhance the physical and psychological recovery of our nation's wounded, ill and injured service members and veterans through the sport of cycling. Ride 2 Recovery's most notable endeavor is Project HERO (Healing Exercise Rehabilitation Opportunity) which uses staff members and volunteers to promote cycling as an integral part of rehabilitation at select military facilities to enhance physical, psychological, spiritual and social recovery. Project HERO is directed by a retired military physical therapist that spent the last decade caring for service men and women wounded in Iraq and Afghanistan. This article describes all facets of the Project HERO initiative and highlights the profound impact it has had in the lives of US military members and veterans.

  17. [Principles and methodology for ecological rehabilitation and security pattern design in key project construction].

    PubMed

    Chen, Li-Ding; Lu, Yi-He; Tian, Hui-Ying; Shi, Qian

    2007-03-01

    Global ecological security becomes increasingly important with the intensive human activities. The function of ecological security is influenced by human activities, and in return, the efficiency of human activities will also be affected by the patterns of regional ecological security. Since the 1990s, China has initiated the construction of key projects "Yangtze Three Gorges Dam", "Qinghai-Tibet Railway", "West-to-East Gas Pipeline", "West-to-East Electricity Transmission" and "South-to-North Water Transfer" , etc. The interaction between these projects and regional ecological security has particularly attracted the attention of Chinese government. It is not only important for the regional environmental protection, but also of significance for the smoothly implementation of various projects aimed to develop an ecological rehabilitation system and to design a regional ecological security pattern. This paper made a systematic analysis on the types and characteristics of key project construction and their effects on the environment, and on the basis of this, brought forward the basic principles and methodology for ecological rehabilitation and security pattern design in this construction. It was considered that the following issues should be addressed in the implementation of a key project: 1) analysis and evaluation of current regional ecological environment, 2) evaluation of anthropogenic disturbances and their ecological risk, 3) regional ecological rehabilitation and security pattern design, 4) scenario analysis of environmental benefits of regional ecological security pattern, 5) re-optimization of regional ecological system framework, and 6) establishment of regional ecosystem management plan.

  18. The WMO Coastal Inundation Forecasting Demonstration Project (CIFDP)

    NASA Astrophysics Data System (ADS)

    Lee, Boram; Resio, Don; Swail, Val; Fakhruddin, Shm; Horsburgh, Kevin

    2014-05-01

    Coastal inundations are an increasing threat to the lives and livelihoods of people living in low-lying, highly-populated coastal areas. According to the World Bank Report 2005, at least 2.6 million people have drowned in coastal inundation, particularly caused by storm surges, over the last 200 years. The purpose of the WMO Coastal Inundation Forecasting Demonstration Project (CIFDP) is to meet the challenges of coastal communities' safety and to support sustainable development through enhancing coastal inundation forecasting and warning systems at the regional scale. Upon completion of national sub-projects of CIFDP, countries will implement an operational system for integrated coastal inundation forecasting and warning, providing an objective basis for coastal disaster (flooding) management; contributing to saving lives, reducing loss of livelihood and property, and enhancing resilience and sustainability in coastal communities. Operation and maintenance of the CIF system would be the responsibility of national operational agencies with a mandate for coastal inundation warnings. The main focus of the CIFDP will be to facilitate the development of efficient forecasting and warning systems for coastal inundation based on robust science and observations: The presentation will describe the scope and the technical framework for CIFDP and describe its implementation in the various sub-projects presently underway.

  19. 75 FR 55109 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... Defense Science and Technology Reinvention Laboratory Personnel Management Demonstration Project... Reinvention Laboratory Personnel Management Demonstration Project, Department of the Army, Army Research... Defense to conduct personnel demonstration projects at DoD laboratories designated as Science...

  20. 75 FR 55199 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... Defense Science and Technology Reinvention Laboratory Personnel Management Demonstration Project... Reinvention Laboratory Personnel Management Demonstration Project, Department of the Army, Army Research... Secretary of Defense to conduct personnel demonstration projects at DoD laboratories designated as...

  1. Draft West Valley Demonstration Project Waste Management Environmental Impact Statement

    SciTech Connect

    N /A

    2003-05-16

    As part of its ongoing West Valley Demonstration Project (WVDP), and in accordance with the West Valley Demonstration Project Act and previous U.S. Department of Energy (DOE or the Department) decisions, DOE proposes to: (1) Continue onsite management of high-level radioactive waste (HLW) until it can be shipped for disposal to a geologic repository (assumed for the purposes of analysis to be the proposed Yucca Mountain Repository near Las Vegas, Nevada), (2) Ship low-level radioactive waste (LLW) and mixed (radioactive and hazardous) LLW offsite for disposal at DOE or other disposal sites, (3) Ship transuranic (TRU) radioactive waste to the Waste Isolation Pilot Plant (WIPP), and (4) Actively manage the waste storage tanks. The waste volumes that are the subject of evaluation in this EIS include only those wastes that are either currently in storage or that would be generated over the next 10 years from ongoing operations and decontamination activities. This EIS analyzes activities that would occur during a 10-year period.

  2. Demonstration of Innovative Applications of Technology for the CT-121 FGD Process. Project Performance Summary, Clean Coal Technology Demonstration Project

    SciTech Connect

    None, None

    2002-08-01

    This project is part of the U.S. Department of Energy's (DOE) Clean Coal Technology Demonstration Program (CCTDP) established to address energy and environmental concerns related to coal use. DOE sought cost-shared partnerships with industry through five nationally competed solicitations to accelerate commercialization of the most promising advanced coal-based power generation and pollution control technologies. The CCTDP, valued at over five billion dollars, has significantly leveraged federal funding by forging effective partnerships founded on sound principles. For every federal dollar invested, CCTDP participants have invested two dollars. These participants include utilities, technology developers, state governments, and research organizations. The project presented here was one of sixteen selected from 55 proposals submitted in 1988 and 1989 in response to the CCTDP second solicitation.

  3. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL. USEPA DEMONSTRATION PROJECT AT CLIMAX, MN. PROJECT SUMMARY

    EPA Science Inventory

    This document is an eight page summary of the final report on arsenic demonstration project at Climax, MN (EPA/600/R-06/152). The objectives of the project are to evaluate the effectiveness of the Kinetico iron removal system in removing arsenic to meet the new arsenic maximum co...

  4. The Interdisciplinary Generalist Curriculum Project: A National Medical School Demonstration Project.

    ERIC Educational Resources Information Center

    Kahn, Norman B., Jr.; And Others

    1995-01-01

    The Interdisciplinary Generalist Curriculum Project was developed to encourage schools of medicine and colleges of osteopathic medicine to implement interdisciplinary generalist curricula in the preclinical years. Five sites were competitively established as demonstration projects, and rigorous attention to creating and maintaining an…

  5. The Social Security Administration's Youth Transition Demonstration Projects: Implementation Lessons from the Original Projects

    ERIC Educational Resources Information Center

    Martinez, John; Fraker, Thomas; Manno, Michelle; Baird, Peter; Mamun, Arif; O'Day, Bonnie; Rangarajan, Anu; Wittenburg, David

    2010-01-01

    This report focuses on the seven original Youth Transition Demonstration (YTD) projects selected for funding in 2003. Three of the original seven projects were selected for a national random assignment evaluation in 2005; however, this report only focuses on program operations prior to joining the random assignment evaluation for the three…

  6. Ultra Low Sulfur Home Heating Oil Demonstration Project

    SciTech Connect

    Batey, John E.; McDonald, Roger

    2015-09-30

    This Ultra Low Sulfur (ULS) Home Heating Oil Demonstration Project was funded by the New York State Energy Research and Development Authority (NYSERDA) and has successfully quantified the environmental and economic benefits of switching to ULS (15 PPM sulfur) heating oil. It advances a prior field study of Low Sulfur (500 ppm sulfur) heating oil funded by NYSERDA and laboratory research conducted by Brookhaven National Laboratory (BNL) and Canadian researchers. The sulfur oxide and particulate matter (PM) emissions are greatly reduced as are boiler cleaning costs through extending cleaning intervals. Both the sulfur oxide and PM emission rates are directly related to the fuel oil sulfur content. The sulfur oxide and PM emission rates approach near-zero levels by switching heating equipment to ULS fuel oil, and these emissions become comparable to heating equipment fired by natural gas. This demonstration project included an in-depth review and analysis of service records for both the ULS and control groups to determine any difference in the service needs for the two groups. The detailed service records for both groups were collected and analyzed and the results were entered into two spreadsheets that enabled a quantitative side-by-side comparison of equipment service for the entire duration of the ULS test project. The service frequency for the ULS and control group were very similar and did indicate increased service frequency for the ULS group. In fact, the service frequency with the ULS group was slightly less (7.5 percent) than the control group. The only exception was that three burner fuel pump required replacement for the ULS group and none were required for the control group.

  7. Strengthening global health security capacity--Vietnam demonstration project, 2013.

    PubMed

    Tran, Phu Dac; Vu, Long Ngoc; Nguyen, Hien Tran; Phan, Lan Trong; Lowe, Wayne; McConnell, Michelle S; Iademarco, Michael F; Partridge, Jeffrey M; Kile, James C; Do, Trang; Nadol, Patrick J; Bui, Hien; Vu, Diep; Bond, Kyle; Nelson, David B; Anderson, Lauren; Hunt, Kenneth V; Smith, Nicole; Giannone, Paul; Klena, John; Beauvais, Denise; Becknell, Kristi; Tappero, Jordan W; Dowell, Scott F; Rzeszotarski, Peter; Chu, May; Kinkade, Carl

    2014-01-31

    Over the past decade, Vietnam has successfully responded to global health security (GHS) challenges, including domestic elimination of severe acute respiratory syndrome (SARS) and rapid public health responses to human infections with influenza A(H5N1) virus. However, new threats such as Middle East respiratory syndrome coronavirus (MERS-CoV) and influenza A(H7N9) present continued challenges, reinforcing the need to improve the global capacity to prevent, detect, and respond to public health threats. In June 2012, Vietnam, along with many other nations, obtained a 2-year extension for meeting core surveillance and response requirements of the 2005 International Health Regulations (IHR). During March-September 2013, CDC and the Vietnamese Ministry of Health (MoH) collaborated on a GHS demonstration project to improve public health emergency detection and response capacity. The project aimed to demonstrate, in a short period, that enhancements to Vietnam's health system in surveillance and early detection of and response to diseases and outbreaks could contribute to meeting the IHR core capacities, consistent with the Asia Pacific Strategy for Emerging Diseases. Work focused on enhancements to three interrelated priority areas and included achievements in 1) establishing an emergency operations center (EOC) at the General Department of Preventive Medicine with training of personnel for public health emergency management; 2) improving the nationwide laboratory system, including enhanced testing capability for several priority pathogens (i.e., those in Vietnam most likely to contribute to public health emergencies of international concern); and 3) creating an emergency response information systems platform, including a demonstration of real-time reporting capability. Lessons learned included awareness that integrated functions within the health system for GHS require careful planning, stakeholder buy-in, and intradepartmental and interdepartmental coordination and

  8. DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT

    SciTech Connect

    Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Andre L. Boehman; David Klinikowski

    2003-04-01

    The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethyl ether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. The strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The laboratory studies have included work with a Navistar V-8 turbodiesel engine, demonstration of engine operation on DME-diesel blends and instrumentation for evaluating fuel properties. The field studies have involved performance, efficiency and emissions measurements with the Champion Motorcoach ''Defender'' shuttle bus which will be converted to DME-fueling. The results include baseline emissions, performance and combustion measurements on the Navistar engine for operation on a federal low sulfur diesel fuel (300 ppm S). Most recently, they have completed engine combustion studies on DME-diesel blends up to 30 wt% DME addition.

  9. 34 CFR 350.12 - What are the general requirements for an Advanced Rehabilitation Research Training Project?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true What are the general requirements for an Advanced Rehabilitation Research Training Project? 350.12 Section 350.12 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT...

  10. 34 CFR 350.12 - What are the general requirements for an Advanced Rehabilitation Research Training Project?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 2 2013-07-01 2013-07-01 false What are the general requirements for an Advanced Rehabilitation Research Training Project? 350.12 Section 350.12 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT...

  11. 34 CFR 350.12 - What are the general requirements for an Advanced Rehabilitation Research Training Project?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 2 2014-07-01 2013-07-01 true What are the general requirements for an Advanced Rehabilitation Research Training Project? 350.12 Section 350.12 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT...

  12. 34 CFR 350.12 - What are the general requirements for an Advanced Rehabilitation Research Training Project?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 2 2012-07-01 2012-07-01 false What are the general requirements for an Advanced Rehabilitation Research Training Project? 350.12 Section 350.12 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT...

  13. AEP Ohio gridSMART Demonstration Project Real-Time Pricing Demonstration Analysis

    SciTech Connect

    Widergren, Steven E.; Subbarao, Krishnappa; Fuller, Jason C.; Chassin, David P.; Somani, Abhishek; Marinovici, Maria C.; Hammerstrom, Janelle L.

    2014-02-01

    This report contributes initial findings from an analysis of significant aspects of the gridSMART® Real-Time Pricing (RTP) – Double Auction demonstration project. Over the course of four years, Pacific Northwest National Laboratory (PNNL) worked with American Electric Power (AEP), Ohio and Battelle Memorial Institute to design, build, and operate an innovative system to engage residential consumers and their end-use resources in a participatory approach to electric system operations, an incentive-based approach that has the promise of providing greater efficiency under normal operating conditions and greater flexibility to react under situations of system stress. The material contained in this report supplements the findings documented by AEP Ohio in the main body of the gridSMART report. It delves into three main areas: impacts on system operations, impacts on households, and observations about the sensitivity of load to price changes.

  14. Demonstration of KHILS two-color IR projection capability

    NASA Astrophysics Data System (ADS)

    Jones, Lawrence E.; Coker, Jason S.; Garbo, Dennis L.; Olson, Eric M.; Murrer, Robert Lee, Jr.; Bergin, Thomas P.; Goldsmith, George C., II; Crow, Dennis R.; Guertin, Andrew W.; Dougherty, Michael; Marler, Thomas M.; Timms, Virgil G.

    1998-07-01

    For more than a decade, there has been considerable discussion about using different IR bands for the detection of low contrast military targets. Theory predicts that a target can have little to no contrast against the background in one IR band while having a discernible signature in another IR band. A significant amount of effort has been invested towards establishing hardware that is capable of simultaneously imaging in two IR bands to take advantage of this phenomenon. Focal plane arrays (FPA) are starting to materialize with this simultaneous two-color imaging capability. The Kinetic Kill Vehicle Hardware-in-the-loop Simulator (KHILS) team of the Air Force Research Laboratory and the Guided Weapons Evaluation Facility (GWEF), both at Eglin AFB, FL, have spent the last 10 years developing the ability to project dynamic IR scenes to imaging IR seekers. Through the Wideband Infrared Scene Projector (WISP) program, the capability to project two simultaneous IR scenes to a dual color seeker has been established at KHILS. WISP utilizes resistor arrays to produce the IR energy. Resistor arrays are not ideal blackbodies. The projection of two IR colors with resistor arrays, therefore, requires two optically coupled arrays. This paper documents the first demonstration of two-color simultaneous projection at KHILS. Agema cameras were used for the measurements. The Agema's HgCdTe detector has responsivity from 4 to 14 microns. A blackbody and two IR filters (MWIR equals 4.2 t 7.4 microns, LWIR equals 7.7 to 13 microns) were used to calibrate the Agema in two bands. Each filter was placed in front of the blackbody one at a time, and the temperature of the blackbody was stepped up in incremental amounts. The output counts from the Agema were recorded at each temperature. This calibration process established the radiance to Agema output count curves for the two bands. The WISP optical system utilizes a dichroic beam combiner to optically couple the two resistor arrays. The

  15. Northwest Open Automated Demand Response Technology Demonstration Project

    SciTech Connect

    Kiliccote, Sila; Piette, Mary Ann; Dudley, Junqiao

    2010-03-17

    The Lawrence Berkeley National Laboratory (LBNL) Demand Response Research Center (DRRC) demonstrated and evaluated open automated demand response (OpenADR) communication infrastructure to reduce winter morning and summer afternoon peak electricity demand in commercial buildings the Seattle area. LBNL performed this demonstration for the Bonneville Power Administration (BPA) in the Seattle City Light (SCL) service territory at five sites: Seattle Municipal Tower, Seattle University, McKinstry, and two Target stores. This report describes the process and results of the demonstration. OpenADR is an information exchange model that uses a client-server architecture to automate demand-response (DR) programs. These field tests evaluated the feasibility of deploying fully automated DR during both winter and summer peak periods. DR savings were evaluated for several building systems and control strategies. This project studied DR during hot summer afternoons and cold winter mornings, both periods when electricity demand is typically high. This is the DRRC project team's first experience using automation for year-round DR resources and evaluating the flexibility of commercial buildings end-use loads to participate in DR in dual-peaking climates. The lessons learned contribute to understanding end-use loads that are suitable for dispatch at different times of the year. The project was funded by BPA and SCL. BPA is a U.S. Department of Energy agency headquartered in Portland, Oregon and serving the Pacific Northwest. BPA operates an electricity transmission system and markets wholesale electrical power at cost from federal dams, one non-federal nuclear plant, and other non-federal hydroelectric and wind energy generation facilities. Created by the citizens of Seattle in 1902, SCL is the second-largest municipal utility in America. SCL purchases approximately 40% of its electricity and the majority of its transmission from BPA through a preference contract. SCL also provides

  16. 34 CFR 359.10 - What types of projects are authorized under this program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... REHABILITATION RESEARCH: SPECIAL PROJECTS AND DEMONSTRATIONS FOR SPINAL CORD INJURIES What Kinds of Activities... rehabilitation services to individuals with spinal cord injuries; and (b) Conduct spinal cord research,...

  17. 34 CFR 359.10 - What types of projects are authorized under this program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... REHABILITATION RESEARCH: SPECIAL PROJECTS AND DEMONSTRATIONS FOR SPINAL CORD INJURIES What Kinds of Activities... rehabilitation services to individuals with spinal cord injuries; and (b) Conduct spinal cord research,...

  18. 34 CFR 359.10 - What types of projects are authorized under this program?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... REHABILITATION RESEARCH: SPECIAL PROJECTS AND DEMONSTRATIONS FOR SPINAL CORD INJURIES What Kinds of Activities... rehabilitation services to individuals with spinal cord injuries; and (b) Conduct spinal cord research,...

  19. 34 CFR 359.10 - What types of projects are authorized under this program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REHABILITATION RESEARCH: SPECIAL PROJECTS AND DEMONSTRATIONS FOR SPINAL CORD INJURIES What Kinds of Activities... rehabilitation services to individuals with spinal cord injuries; and (b) Conduct spinal cord research,...

  20. 34 CFR 359.10 - What types of projects are authorized under this program?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... REHABILITATION RESEARCH: SPECIAL PROJECTS AND DEMONSTRATIONS FOR SPINAL CORD INJURIES What Kinds of Activities... rehabilitation services to individuals with spinal cord injuries; and (b) Conduct spinal cord research,...

  1. Project Integration Architecture: A Practical Demonstration of Information Propagation

    NASA Technical Reports Server (NTRS)

    Jones, William Henry

    2005-01-01

    One of the goals of the Project Integration Architecture (PIA) effort is to provide the ability to propagate information between disparate applications. With this ability, applications may then be formed into an application graph constituting a super-application. Such a super-application would then provide all of the analysis appropriate to a given technical system. This paper reports on a small demonstration of this concept in which a Computer Aided Design (CAD) application was connected to an inlet analysis code and geometry information automatically propagated from one to the other. The majority of the work reported involved not the technology of information propagation, but rather the conversion of propagated information into a form usable by the receiving application.

  2. ISCO Demonstration Project at Tucson International Authority Superfund Site

    NASA Astrophysics Data System (ADS)

    Marble, J. C.; Fuhrig, L.; Brusseau, M. L.; Plaschke, M.; Brinker, F.

    2005-12-01

    In-situ chemical oxidation (ISCO) has gained support as a remediation technique for immiscible-liquid contaminated source zones. 1,1-dichloroethene (DCE) is present at the Samsonite Building Area, which is part of the Tucson International Airport Authority Superfund Site. Based on prior site characterization, DCE is thought to be located in a lower permeability zone adjacent to the water table of a local groundwater zone. A pilot-scale ISCO demonstration project using potassium permanganate (KMnO4) was conducted at the site. Bench-scale studies using core samples were used to determine natural oxidant demand and establish optimal KMnO4 injection concentration. Single, sequential, low-pressure injections were implemented for a 9-well network encompassing the primary source zone. Groundwater monitoring was performed before, during, and after injection.

  3. Electric G-Van demonstration and commercial assessment project

    SciTech Connect

    Braga, B.D. )

    1992-12-01

    The Electric Power Research Institute was awarded this grant to continue the joint effort initiated by EPRI, and VE International to proceed beyond the prototype phase of the electric G-Van development. The goal of EPRI and VEHMA was to develop a market for the electric G-Van, and to distribute them to commercial fleet operators. The objective of this project was to produce G-Vans in a production facility that would be comparable to the GMC Truck internal combustion engine Vandura Van produced by General Motors in quality, reliability, durability and safety. An initial market assessment/demonstration phase of sixty (60) vehicles was to be undertaken, with the ability to expand production volume quickly to meet market demands. Brief description of each task of this grant is given and the actions taken by EPRI to complete them.

  4. Functional description of the West Valley Demonstration Project Vitrification Facility

    SciTech Connect

    Borisch, R.R.; McMahon, C.L.

    1990-07-01

    The primary objective of the West Valley Demonstration Project (WVDP) is the solidification of approximately 2.1 million liters (560,000 gallons) of high-level radioactive waste (HLW) which resulted from the operation of a nuclear fuel reprocessing plant. Since the original plant was not built to accommodate the processing of waste beyond storage in underground tanks, HLW solidification by vitrification presented numerous engineering challenges. Existing facilities required redesign and conversion to meet their new purpose. Vitrification technology and systems needed to be created and then tested. Equipment modifications, identified from cold test results, were incorporated into the final equipment configuration to be used for radioactive (hot) operations. Cold operations have defined the correct sequence and optimal functioning of the equipment to be used for vitrification and have verified the process by which waste will be solidified into borosilicate glass.

  5. Processing the THOREX waste at the West Valley demonstration project

    SciTech Connect

    Barnes, S.M.; Schiffhauer, M.A.

    1994-12-31

    This paper focuses on several options for neutralizing the THOREX and combining it with the PUREX wastes. Neutralization testing with simulated wastes (nonradioactive chemicals) was performed to evaluate the neutralization reactions and the reaction product generation. Various methods for neutralizing the THOREX solution were examined to determine their advantages and disadvantages relative to the overall project objectives and compatibility with the existing process. The primary neutralization process selection criteria were safety and minimizing the potential delays prior to vitrification. The THOREX neutralization method selected was direct addition to the high pH PUREX wastes within Tank 8D-2. Laboratory testing with simulated waste has demonstrated rapid neutralization of the THOREX waste acid. Test results for various direct addition scenarios has established the optimum process operating conditions which provide the largest safety margins.

  6. Bethlehem Steel Corporation Blast Furnace Granulated Coal Injection Demonstration Project

    SciTech Connect

    Not Available

    1993-05-01

    Construction of the proposed BFGCI system is not expected to have significant impacts on air quality, noise, and land use at the Burns Harbor Plant area. Operation of the proposed BFGCI system is not expected to have significant impacts on the environment at the Burns Harbor Plant area. An increase of approximately 30 tons/yr for NO{sub x} and approximately 13 tons/yr for particulate matter (from the coal storage area) is expected. These emissions are within the currently permitted levels. Carbon dioxide emissions, which are unregulated, would increase by about 220,000 tons/yr at the Burns Harbor Plant. Water withdrawn and returned to Lake Michigan would increase by 1.3 million gal/d (0.4 percent of existing permitted discharge) for non-contact cooling water. No protected species, floodplains, wetlands, or cultural resources would be affected by operation of the proposed facility. Small economic benefits would occur from the creation of 5 or 6 permanent new jobs during the operation of the proposed demonstration project and subsequent commercial operation. Under the No Action Alternative, the proposed project would not receive cost-shared funding support from DOE.

  7. The advanced linked extended reconnaissance and targeting technology demonstration project

    NASA Astrophysics Data System (ADS)

    Cruickshank, James; de Villers, Yves; Maheux, Jean; Edwards, Mark; Gains, David; Rea, Terry; Banbury, Simon; Gauthier, Michelle

    2007-06-01

    The Advanced Linked Extended Reconnaissance & Targeting (ALERT) Technology Demonstration (TD) project is addressing key operational needs of the future Canadian Army's Surveillance and Reconnaissance forces by fusing multi-sensor and tactical data, developing automated processes, and integrating beyond line-of-sight sensing. We discuss concepts for displaying and fusing multi-sensor and tactical data within an Enhanced Operator Control Station (EOCS). The sensor data can originate from the Coyote's own visible-band and IR cameras, laser rangefinder, and ground-surveillance radar, as well as beyond line-of-sight systems such as a mini-UAV and unattended ground sensors. The authors address technical issues associated with the use of fully digital IR and day video cameras and discuss video-rate image processing developed to assist the operator to recognize poorly visible targets. Automatic target detection and recognition algorithms processing both IR and visible-band images have been investigated to draw the operator's attention to possible targets. The machine generated information display requirements are presented with the human factors engineering aspects of the user interface in this complex environment, with a view to establishing user trust in the automation. The paper concludes with a summary of achievements to date and steps to project completion.

  8. The PMI local site demonstration project: lessons in technical assistance.

    PubMed

    Strand, J; Rosenbaum, J; Hanlon, E; Jimerson, A

    2000-03-01

    This paper presents the lessons that were learned in technical assistance during the Preventive Marketing Initiative local site demonstration project in the US. The program has been ongoing for 5 years, with social marketers from the Academy for Educational Development and Porter Novelli using social marketing and behavioral science principles to develop HIV prevention programs for and with local teens. With the success of the program, community-based prevention programs are increasingly being requested since better outcomes resulted from a few dollars of investment. Likewise, funders and prevention researchers were challenged to transfer state-of-the-art prevention technologies for communities to apply it readily. The success achieved by the project, however, provides important lessons that would save time and money for future community-based Prevention Marketing efforts. Among the lessons were the need to seek out or establish conditions in the community that are conducive to success, as well as the need to offer technical assistance that would mobilize communities in developing more effective Prevention Marketing programs.

  9. West Valley Demonstration Project, West Valley, New York: Annual report

    SciTech Connect

    Not Available

    1989-01-01

    Under the West Valley Demonstration Project Act, Public Law 96-368, liquid high-level radioactive waste stored at the Western New York Nuclear Services Center, West Valley, New York, that resulted from spent nuclear fuel reprocessing operations conducted between 1966 and 1972, is to be solidified in borosilicate glass and transported to a federal repository for geologic disposal. A major milestone was reached in May 1988 when the Project began reducing the volume of the liquid high-level waste. By the end of 1988, approximately 15 percent of the initial inventory had been processed into two waste streams. The decontaminated low-level liquid waste is being solidified in cement. The high-level waste stream is being stored in an underground tank pending its incorporation into borosilicate glass. Four tests of the waste glass melter system were completed. These tests confirmed equipment operability, control system reliability, and provided samples of waste glass for durability testing. In mid-1988, the Department validated an integrated cost and schedule plan for activities required to complete the production of the waste borosilicate glass. Design of the radioactive Vitrification Facility continued.

  10. Construction Cost Analysis : Residential Construction Demonstration Project Cycle II.

    SciTech Connect

    Barnett, Cole; Thor, Philip W.

    1990-06-01

    The Residential Construction Demonstration Project (RCDP) is designed to demonstrate new residential building techniques and product innovations which advance the stage-of-the-art in constructing energy-efficient electrically heated residences. A secondary purpose is to obtain documented cost and energy savings data from which to make accurate assessments of the cost-effectiveness of various conservation innovations. The project solicits participation of regional homebuilders by offering them financial incentives for constructing homes to the Model Conservation Standards (MCS) and including at least one innovation.'' The innovations are determined by BPA and the States prior to construction and represent construction techniques or energy saving products that might reduce the cost of building MCS homes, or expand the options available to builders in achieving MCS levels of energy efficiency in homes. Besides covering some of the additional risk for employing the innovation, the incentive payment guarantees that builders will provide certain amounts of information regarding the cost and acceptability of building the homes. In addition, an incentive is paid to homeowners for their participation in data collection efforts following construction. Several one-time'' tests were performed on the houses and homeowners were required to report energy consumption and temperature data on a weekly basis for approximately 18 months. BPA and the States compile the information obtained from the builders and homeowners. Access to this data is provided for the purpose of analyzing the cost and performance of the RCDP homes, as well as understanding the value of the various innovations that are tested. 25 tabs., 4 figs.

  11. City of Chula Vista hydrogen fuel cell bus demonstration project

    SciTech Connect

    Gustafson, B.; Bamberger, B.

    1996-10-01

    Hydrogen as an energy carrier and fuel has potential for various uses including electricity, commercial, residential, transportation, and industrial. It is an energy carrier that can be produced from a variety of primary sources and potentially can accomplish these various uses while significantly reducing pollution by substituting for or reducing the use of fossil fuels. One of the most immediate and potentially viable roles for hydrogen as an energy carrier will be its use as a transportation fuel, especially in densely populated urban areas where automotive emissions contribute significantly to air pollution. The Department of Energy`s commitment to research and development of hydrogen as an alternative fuel, and California`s Zero Emission Vehicle (ZEV) requirements, both provide the impetus and favorable circumstance for demonstrating hydrogen as a transportation fuel on an urban bus system. The purpose of this project is to demonstrate the feasibility of using solid polymer fuel cells in a hydrogen-powered electric drive system for an urban transit bus application. Fuel cell buses use hydrogen fuel and oxygen from the air to produce electrical power with the only byproduct being pure water. Proton Exchange Membrane (PEM) fuel cells are proposed for this project. Current evidence suggests that fuel cells, which rely on hydrogen and a process known as proton exchange to generate their power, appear to have an infinite life span. All exhaust pollution is completely eliminated, resulting in a Zero Emission Vehicle (ZEV). An urban bus system offers the potential for developing a market for the production of hydrogen propulsion technology due to extensive vehicular use in densely populated areas experiencing pollution from numerous sources, and because the central garaging facilities or the bus system facilitates fueling and maintenance functions.

  12. A new project for rehabilitation and psychomotor disease analysis with virtual reality support.

    PubMed

    Rovetta, A; Lorini, F; Canina, M

    1998-01-01

    This paper deals with the project DD1-97, developed inside European Project VREPAR, for the application of a new equipment for psychomotor disease analysis and rehabilitation. The small equipment presents a glove for one finger, with sensors, which detect the movement of the phalanges and the force of the finger tip on a button. Electromyographs are measuring the nervous signals from flexion and extension muscles of the finger. In a portable computer a program examines the signals and elaborates them. The commands for the patient are of 4 kinds: -dynamic motion of the finger; -motion with vision of the finger; -motion without vision of the finger; -control by the images from virtual reality which reproduces the "virtual finger". The results with healthy persons show a distribution in the foreseen range; with disabled person (with Parkinson's disease) show that virtual reality may support rehabilitation for neuromotor problems. The equipment is designed with reference to the most modern ergonomic concepts.

  13. Advanced Flue Gas Desulfurization (AFGD) Demonstration Project, A DOE Assessment

    SciTech Connect

    National Energy Technology Laboratory

    2001-08-31

    The AFGD process as demonstrated by Pure Air at the Bailly Station offers a reliable and cost-effective means of achieving a high degree of SO{sub 2} emissions reduction when burning high-sulfur coals. Many innovative features have been successfully incorporated in this process, and it is ready for widespread commercial use. The system uses a single-loop cocurrent scrubbing process with in-situ oxidation to produce wallboard-grade gypsum instead of wet sludge. A novel wastewater evaporation system minimizes effluents. The advanced scrubbing process uses a common absorber to serve multiple boilers, thereby saving on capital through economies of scale. Major results of the project are: (1) SO{sub 2} removal of over 94 percent was achieved over the three-year demonstration period, with a system availability exceeding 99.5 percent; (2) a large, single absorber handled the combined flue gas of boilers generating 528 MWe of power, and no spares were required; (3) direct injection of pulverized limestone into the absorber was successful; (4) Wastewater evaporation eliminated the need for liquid waste disposal; and (5) the gypsum by-product was used directly for wallboard manufacture, eliminating the need to dispose of waste sludge.

  14. Locomotive Emission and Engine Idle Reduction Technology Demonstration Project

    SciTech Connect

    John R. Archer

    2005-03-14

    In response to a United States Department of Energy (DOE) solicitation, the Maryland Energy Administration (MEA), in partnership with CSX Transportation, Inc. (CSXT), submitted a proposal to DOE to support the demonstration of Auxiliary Power Unit (APU) technology on fifty-six CSXT locomotives. The project purpose was to demonstrate the idle fuel savings, the Nitrous Oxide (NOX) emissions reduction and the noise reduction capabilities of the APU. Fifty-six CSXT Baltimore Division locomotives were equipped with APUs, Engine Run Managers (ERM) and communications equipment to permit GPS tracking and data collection from the locomotives. Throughout the report there is mention of the percent time spent in the State of Maryland. The fifty-six locomotives spent most of their time inside the borders of Maryland and some spent all their time inside the state borders. Usually when a locomotive traveled beyond the Maryland State border it was into an adjoining state. They were divided into four groups according to assignment: (1) Power Unit/Switcher Mate units, (2) Remote Control units, (3) SD50 Pusher units and (4) Other units. The primary data of interest were idle data plus the status of the locomotive--stationary or moving. Also collected were main engine off, idling or working. Idle data were collected by county location, by locomotive status (stationary or moving) and type of idle (Idle 1, main engine idling, APU off; Idle 2, main engine off, APU on; Idle 3, main engine off, APU off; Idle 4, main engine idle, APU on). Desirable main engine idle states are main engine off and APU off or main engine off and APU on. Measuring the time the main engine spends in these desirable states versus the total time it could spend in an engine idling state allows the calculation of Percent Idle Management Effectiveness (%IME). IME is the result of the operation of the APU plus the implementation of CSXT's Warm Weather Shutdown Policy. It is difficult to separate the two. The units

  15. INTEGRATED GASIFICATION COMBINED CYCLE PROJECT 2 MW FUEL CELL DEMONSTRATION

    SciTech Connect

    FuelCell Energy

    2005-05-16

    With about 50% of power generation in the United States derived from coal and projections indicating that coal will continue to be the primary fuel for power generation in the next two decades, the Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCTDP) has been conducted since 1985 to develop innovative, environmentally friendly processes for the world energy market place. The 2 MW Fuel Cell Demonstration was part of the Kentucky Pioneer Energy (KPE) Integrated Gasification Combined Cycle (IGCC) project selected by DOE under Round Five of the Clean Coal Technology Demonstration Program. The participant in the CCTDP V Project was Kentucky Pioneer Energy for the IGCC plant. FuelCell Energy, Inc. (FCE), under subcontract to KPE, was responsible for the design, construction and operation of the 2 MW fuel cell power plant. Duke Fluor Daniel provided engineering design and procurement support for the balance-of-plant skids. Colt Engineering Corporation provided engineering design, fabrication and procurement of the syngas processing skids. Jacobs Applied Technology provided the fabrication of the fuel cell module vessels. Wabash River Energy Ltd (WREL) provided the test site. The 2 MW fuel cell power plant utilizes FuelCell Energy's Direct Fuel Cell (DFC) technology, which is based on the internally reforming carbonate fuel cell. This plant is capable of operating on coal-derived syngas as well as natural gas. Prior testing (1992) of a subscale 20 kW carbonate fuel cell stack at the Louisiana Gasification Technology Inc. (LGTI) site using the Dow/Destec gasification plant indicated that operation on coal derived gas provided normal performance and stable operation. Duke Fluor Daniel and FuelCell Energy developed a commercial plant design for the 2 MW fuel cell. The plant was designed to be modular, factory assembled and truck shippable to the site. Five balance-of-plant skids incorporating fuel processing, anode gas oxidation, heat recovery, water

  16. LOW SULFUR HOME HEATING OIL DEMONSTRATION PROJECT SUMMARY REPORT.

    SciTech Connect

    BATEY, J.E.; MCDONALD, R.J.

    2005-06-01

    This project was funded by NYSERDA and has clearly demonstrated many advantages of using low sulfur content heating oil to provide thermal comfort in homes. Prior laboratory research in the United States and Canada had indicated a number of potential benefits of using lower sulfur (0.05%) heating oil. However, this prior research has not resulted in the widespread use of low sulfur fuel oil in the marketplace. The research project described in this report was conducted with the assistance of a well-established fuel oil marketer in New York State (NYS) and has provided clear proof of the many real-world advantages of marketing and using low sulfur content No. 2 fuel oil. The very positive experience of the participating marketer over the past three years has already helped to establish low sulfur heating oil as a viable option for many other fuel marketers. In large part, based on the initial findings of this project and the experience of the participating NYS oilheat marketer, the National Oilheat Research Alliance (NORA) has already fully supported a resolution calling for the voluntary use of low sulfur (0.05 percent) home heating oil nationwide. The NORA resolution has the goal of converting eighty percent of all oil-heated homes to the lower sulfur fuel (0.05 percent by weight) by the year 2007. The Oilheat Manufacturers Association (OMA) has also passed a resolution fully supporting the use of lower sulfur home heating oil in the equipment they manufacture. These are important endorsements by prominent national oil heat associations. Using lower sulfur heating oil substantially lowers boiler and furnace fouling rates. Laboratory studies had indicated an almost linear relationship between sulfur content in the oil and fouling rates. The completed NYSERDA project has verified past laboratory studies in over 1,000 occupied residential homes over the course of three heating seasons. In fact, the reduction in fouling rates so clearly demonstrated by this project is

  17. DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT

    SciTech Connect

    Elana M. Chapman; Shirish Bhide; Andre L. Boehman; David Klinikowski

    2003-04-01

    The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethyl ether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. The strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. Within the Combustion Laboratory of the Penn State Energy Institute, they have installed and equipped a Navistar V-8 direct-injection turbodiesel engine for measurement of gaseous and particulate emissions and examination of the impact of fuel composition on diesel combustion. They have also reconfigured a high-pressure viscometer for studies of the viscosity, bulk modulus (compressibility) and miscibility of blends of diesel fuel, dimethyl ether and lubricity additives. The results include baseline emissions, performance and combustion measurements on the Navistar engine for operation on a federal low sulfur diesel fuel (300 ppm S). Most recently, they have examined blends of an oxygenated fuel additive (a liquid fuel called CETANER{trademark}) produced by Air Products, for comparison with dimethyl ether blended at the same weight of oxygen addition, 2 wt.%. While they have not operated the engine on DME yet, they are now preparing to do so. A fuel system for delivery of DME/Diesel blends has been configured

  18. DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT

    SciTech Connect

    Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Howard Glunt; Andre L. Boehman; Allen Homan; David Klinikowski

    2003-04-01

    The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethylether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. The strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The bulk of the efforts over the past year were focused on the conversion of the campus shuttle bus. This process, started in August 2001, took until April 2002 to complete. The process culminated in an event to celebrate the launching of the shuttle bus on DME-diesel operation on April 19, 2002. The design of the system on the shuttle bus was patterned after the system developed in the engine laboratory, but also was subjected to a rigorous failure modes effects analysis with help from Dr. James Hansel of Air Products. The result of this FMEA was the addition of layers of redundancy and over-pressure protection to the system on the shuttle bus. The system became operation in February 2002. Preliminary emissions tests and basic operation of the shuttle bus took place at the Pennsylvania Transportation institute's test track facility near the University Park airport. After modification and optimization of the system on the bus, operation on the campus shuttle route began in early June 2002. However, the work

  19. 77 FR 8234 - National Institute on Disability and Rehabilitation Research-Disability and Rehabilitation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... National Institute on Disability and Rehabilitation Research-- Disability and Rehabilitation Research... Disability and Rehabilitation Research-- Disability and Rehabilitation Research Projects and Centers Program-- Disability and Rehabilitation Research Project--Center on Knowledge Translation for Disability...

  20. Town of Edinburg landfill reclamation demonstration project. Final report

    SciTech Connect

    Not Available

    1992-05-15

    Landfill reclamation is the process of excavating a solid waste landfill to recover materials, reduce environmental impacts, restore the land resource, and, in some cases, extend landfill life. Using conventional surface mining techniques and specialized separation equipment, a landfill may be separated into recyclable material, combustible material, a soil/compost fraction and residual waste. A landfill reclamation demonstration project was hosted at the Town of Edinburg municipal landfill in northwest Saratoga County. The report examines various separation techniques employed at the site and appropriate uses for reclaimed materials. Specifications regarding engineered work plans, health and safety monitoring, and contingency preparedness are discussed. Major potential applications and benefits of using landfill reclamation technology at existing landfills are identified and discussed. The research and development aspect of the report also examines optimal screening technologies, site selection protocol and the results of a test burn of reclaimed waste at a waste-to-energy facility. Landfill reclamation costs are developed, and economic comparisons are made between reclamation costs and conventional landfill closure costs, with key criteria identified. The results indicate that, although dependent on site-specific conditions and economic factors, landfill reclamation can be a technically and economically feasible alternative or companion to conventional landfill closure under a range of favorable conditions. Feasibility can be determined only after an investigation of the variety of landfill conditions and reclamation options.

  1. Staunton 1 reclamation demonstration project. Aquatic ecosystems. Final report

    SciTech Connect

    Vinikour, W. S.

    1981-02-01

    To provide long-term indications of the potential water quality improvements following reclamation efforts at the Staunton 1 Reclamation Demonstration Project, macroinvertebrates were collected from three on-site ponds and from the receiving stream (Cahokia Creek) for site drainage. Implications for potential benthic community differences resulting from site runoff were disclosed, but macroinvertebrate diversity throughout Cahokia Creek was limited due to an unstable, sandy substrate. The three ponds sampled were the New Pond, which was created as part of the reclamation activities; the Shed Pond, which and the Old Pond, which, because it was an existing, nonimpacted pond free of site runoff, served as a control. Comparisons of macroinvertebrates from the ponds indicated the potential for the New Pond to develop into a productive ecosystem. Macroinvertebrates in the New Pond were generally species more tolerant of acid mine drainage conditions. However, due to the present limited faunal densities and the undesirable physical and chemical characteristics of the New Pond, the pond should not be stocked with fish at this time.

  2. Technical safety appraisal of the West Valley Demonstration Project

    SciTech Connect

    Not Available

    1989-09-01

    This report presents the results of one in a series of Technical Safety Appraisals (TSAs) being conducted of DOE nuclear operations by the Assistant Secretary for Environment, Safety, and Health Office of Safety Appraisals TSAs are one of the ititiatives announced by the Secretary of Energy on September 18, 1985, to enhance the DOE environment, safety and health program. This report presents the results of a TSA of the West Valley Demonstration Project (WVDP). The appraisal was conducted by a team of exerts assembled by the DOE Office of Safety Appraisal and was conducted during onsite visits of June 26-30 and July 10-21, 1989. West Valley, about 30 miles south of Buffalo, New York is the location of the only commercial nuclear fuel reprocessing facility operated in the United States. Nuclear Fuels Services, Inc. (NFS) operated the plant from 1966 to 1972 and processed about 640 metric tons of spent reactor fuel. The reprocessing operation generated about 560,000 gallons of high-level radioactive waste, which was transferred into underground tanks for storage. In 1972 NFS closed the plant and subsequently decided not to reopen it.

  3. DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT

    SciTech Connect

    Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Howard Glunt; Andre L. Boehman; Allen Homan; David Klinikowski

    2003-04-01

    The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethyl ether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. Their strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The bulk of the efforts over the past year were focused on the conversion of the campus shuttle bus. This process, started in August 2001, took until April 2002 to complete. The process culminated in an event to celebrate the launching of the shuttle bus on DME-diesel operation on April 19, 2002. The design of the system on the shuttle bus was patterned after the system developed in the engine laboratory, but also was subjected to a rigorous failure modes effects analysis (FMEA, referred to by Air Products as a ''HAZOP'' analysis) with help from Dr. James Hansel of Air Products. The result of this FMEA was the addition of layers of redundancy and over-pressure protection to the system on the shuttle bus. The system became operational in February 2002. Preliminary emissions tests and basic operation of the shuttle bus took place at the Pennsylvania Transportation Institute's test track facility near the University Park airport. After modification and optimization of the system on the bus, operation on the

  4. 78 FR 78342 - Extension of Autism Services Demonstration Project for TRICARE Beneficiaries Under the Extended...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... of the Secretary Extension of Autism Services Demonstration Project for TRICARE Beneficiaries Under... Access to Autism Services Demonstration Project (Autism Demonstration) under the Extended Care Health Option (ECHO) for beneficiaries diagnosed with an Autism Spectrum Disorder (ASD). Under the...

  5. Significance and effect of ecological rehabilitation project in inland river basins in northwest China.

    PubMed

    Wang, Yu; Feng, Qi; Chen, Lijuan; Yu, Tengfei

    2013-07-01

    The Ecological Water Transfer and Rehabilitation Project in the arid inland area of northwest China is an important measure in restoring a deteriorated ecosystem. However, the sustainability of the project is affected by many socio-economic factors. This article examines the attitudes of the local populace toward the project, its impact on the livelihood of the people, and the positive effects of water-efficient agricultural practices in Ejina County. Related data were collected through questionnaire surveys and group discussions. The results identified three critical issues that may influence the sustainability of the project in the study area. The first issue relates to the impact of the project on the livelihood of local herdsmen. The potential for the sustainability of the project is compromised because the livelihood of the herdsmen greatly depends on the compensation awarded by the project. The second issue is that the project did not raise the water resource utilization ratio, which may undermine its final purpose. Finally, the compensation provided by the project considers losses in agriculture, but neglects the externalities and public benefit of eco-water. Thus, appropriate compensation mechanisms should be established and adopted according to local economic, environmental, and social conditions. Some recommendations for improving the sustainability of the project are provided based on the results of this study.

  6. Texas Telecomputer Grid/Bilingual Career Education Demonstration Project. Final Project Performance Report.

    ERIC Educational Resources Information Center

    American Technological Univ., Killeen, TX.

    A demonstration project was conducted in 1975-76 at three locations in Texas to show the effectiveness of the Texas Telecomputer Grid (TTG) as a teaching method in bilingual career education. (TTG is a system designed to connect regional concentrations of computer and television resources by microwaves to transmit televised programs, computer…

  7. Demonstration Project 111, ITS/CVO Technology Truck, Final Project Report

    SciTech Connect

    Gambrell, KP

    2002-01-11

    In 1995, the planning and building processes began to design and develop a mobile demonstration unit that could travel across the nation and be used as an effective outreach tool. In 1997, the unit was completed; and from June 1997 until December 2000, the Federal Highway Administration (FHWA)/Federal Motor Carrier Safety Administration (FMCSA) mobilized the Technology Truck, also known as Demonstration Project No. 111, ''Advanced Motor Carrier Operations and Safety Technologies.'' The project featured the latest available state-of-the-practice intelligent transportation systems (ITS) technologies designed to improve both the efficiency and safety of commercial vehicle operations (CVO). The Technology Truck was designed to inform and educate the motor carrier community and other stakeholders regarding ITS technologies, thus gaining support and buy-in for participation in the ITS program. The primary objective of the project was to demonstrate new and emerging ITS/CVO technologies and programs, showing their impact on motor carrier safety and productivity. In order to meet the objectives of the Technology Truck project, the FHWA/FMCSA formed public/private partnerships with industry and with Oak Ridge National Laboratory to demonstrate and display available ITS/CVO technologies in a cooperative effort. The mobile demonstration unit was showcased at national and regional conferences, symposiums, universities, truck shows and other venues, in an effort to reach as many potential users and decision makers as possible. By the end of the touring phase, the ITS/CVO Technology Truck had been demonstrated in 38 states, 4 Canadian provinces, 88 cities, and 114 events; been toured by 18,099 people; and traveled 115,233 miles. The market penetration for the Technology Truck exceeded 4,000,000, and the website received more than 25,000 hits. In addition to the Truck's visits, the portable ITS/CVO kiosk was demonstrated at 31 events in 23 cites in 15 states.

  8. Gas Dynamic Spray Technology Demonstration Project Management. Joint Test Report

    NASA Technical Reports Server (NTRS)

    Lewis, Pattie

    2011-01-01

    The standard practice for protecting metallic substrates in atmospheric environments is the use of an applied coating system. Current coating systems used across AFSPC and NASA contain volatile organic compounds (VOCs) and hazardous air pollutants (HAPs). These coatings are sUbject to environmental regulations at the Federal and State levels that limit their usage. In addition, these coatings often cannot withstand the high temperatures and exhaust that may be experienced by Air Force Space Command (AFSPC) and NASA structures. In response to these concerns, AFSPC and NASA have approved the use of thermal spray coatings (TSCs). Thermal spray coatings are extremely durable and environmentally friendly coating alternatives, but utilize large cumbersome equipment for application that make the coatings difficult and time consuming to repair. Other concerns include difficulties coating complex geometries and the cost of equipment, training, and materials. Gas Dynamic Spray (GOS) technology (also known as Cold Spray) was evaluated as a smaller, more maneuverable repair method as well as for areas where thermal spray techniques are not as effective. The technology can result in reduced maintenance and thus reduced hazardous materials/wastes associated with current processes. Thermal spray and GOS coatings also have no VOCs and are environmentally preferable coatings. The primary objective of this effort was to demonstrate GDS technology as a repair method for TSCs. The aim was that successful completion of this project would result in approval of GDS technology as a repair method for TSCs at AFSPC and NASA installations to improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination, and reduce the amount of hazardous waste generated.

  9. Project Genesis: Mars in situ propellant technology demonstrator mission

    NASA Technical Reports Server (NTRS)

    Acosta, Francisco Garcia; Anderson, Scott; Andrews, Jason; Deger, Matt; Hedman, Matt; Kipp, Jared; Kobayashi, Takahisa; Marcelo, Mohrli; Mark, Karen; Matheson, Mark

    1994-01-01

    Project Genesis is a low cost, near-term, unmanned Mars mission, whose primary purpose is to demonstrate in situ resource utilization (ISRU) technology. The essence of the mission is to use indigenously produced fuel and oxidizer to propel a ballistic hopper. The Mars Landing Vehicle/Hopper (MLVH) has an Earth launch mass of 625 kg and is launched aboard a Delta 117925 launch vehicle into a conjunction class transfer orbit to Mars. Upon reaching its target, the vehicle performs an aerocapture maneuver and enters an elliptical orbit about Mars. Equipped with a ground penetrating radar, the MLVH searches for subsurface water ice deposits while in orbit for several weeks. A deorbit burn is then performed to bring the MLVH into the Martian atmosphere for landing. Following aerobraking and parachute deployment, the vehicle retrofires to a soft landing on Mars. Once on the surface, the MLVH begins to acquire scientific data and to manufacture methane and oxygen via the Sabatier process. This results in a fuel-rich O2/CH4 mass ratio of 2, which yields a sufficiently high specific impulse (335 sec) that no additional oxygen need be manufactured, thus greatly simplifying the design of the propellant production plant. During a period of 153 days the MLVH produces and stores enough fuel and oxidizer to make a 30 km ballistic hop to a different site of scientific interest. At this new location the MLVH resumes collecting surface and atmospheric data with the onboard instrumentation. Thus, the MLVH is able to provide a wealth of scientific data which would otherwise require two separate missions or separate vehicles, while proving a new and valuable technology that will facilitate future unmanned and manned exploration of Mars. Total mission cost, including the Delta launch vehicle, is estimated to be $200 million.

  10. Ford Plug-In Project: Bringing PHEVs to Market Demonstration and Validation Project

    SciTech Connect

    D'Annunzio, Julie; Slezak, Lee; Conley, John Jason

    2014-03-26

    This project is in support of our national goal to reduce our dependence on fossil fuels. By supporting efforts that contribute toward the successful mass production of plug-in hybrid electric vehicles, our nation’s transportation-related fuel consumption can be offset with energy from the grid. Over four and a half years ago, when this project was originally initiated, plug-in electric vehicles were not readily available in the mass marketplace. Through the creation of a 21 unit plug-in hybrid vehicle fleet, this program was designed to demonstrate the feasibility of the technology and to help build cross-industry familiarity with the technology and interface of this technology with the grid. Ford Escape PHEV Demonstration Fleet 3 March 26, 2014 Since then, however, plug-in vehicles have become increasingly more commonplace in the market. Ford, itself, now offers an all-electric vehicle and two plug-in hybrid vehicles in North America and has announced a third plug-in vehicle offering for Europe. Lessons learned from this project have helped in these production vehicle launches and are mentioned throughout this report. While the technology of plugging in a vehicle to charge a high voltage battery with energy from the grid is now in production, the ability for vehicle-to-grid or bi-directional energy flow was farther away than originally expected. Several technical, regulatory and potential safety issues prevented progressing the vehicle-to-grid energy flow (V2G) demonstration and, after a review with the DOE, V2G was removed from this demonstration project. Also proving challenging were communications between a plug-in vehicle and the grid or smart meter. While this project successfully demonstrated the vehicle to smart meter interface, cross-industry and regulatory work is still needed to define the vehicle-to-grid communication interface.

  11. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project

  12. Primary-care based participatory rehabilitation: users’ views of a horticultural and arts project

    PubMed Central

    Barley, Elizabeth A; Robinson, Susan; Sikorski, Jim

    2012-01-01

    Background Participation in horticulture and arts may improve wellbeing in those with mental and physical illness. Aim To conduct an in-depth exploration of the views and experience of participants of a primary-care-based horticultural and participatory arts rehabilitation project (Sydenham Garden). Design and setting Qualitative interview study of a primary-care-based horticultural and participatory arts rehabilitation project in South London. Method Semi-structured interviews were conducted with 16 participants (referred to as ‘coworkers’) of Sydenham Garden. Seven were female. Participants were aged between 38 and 91 years and had a range of severe mental and physical health problems; most had depression. The interviews were analysed using constant comparison and thematic analysis. Results Data were overwhelmingly positive concerning participation. Coworkers considered participation in the project to promote wellbeing by providing purposeful and enjoyable activity and interest, improving mood and self-perceptions, and providing an escape from life’s pressures. Being outdoors was considered therapeutic. The most-valued aspect of participation was the social contact derived as a result of it. Many of the coworkers who were interviewed developed transferable skills, including nationally recognised qualifications, which they valued highly. Conclusion Delivery of horticultural therapy and participatory arts is a feasible model for improving wellbeing in patients in primary care who have serious illness. Longer-term studies are needed to address what happens to people after leaving such projects. PMID:22520790

  13. HARD CHROME POLLUTION PREVENTION DEMONSTRATION PROJECT - INTERIM REPORT

    EPA Science Inventory

    In the project, five chromium emission prevention/control devices were tested tha cover the spectrum of prevention/control techniques currently in use in small- and large-size hard chromium electroplating job shops. The Project results show that some of the tested devices had ch...

  14. Demonstration of Improved Technologies for Rehabilitating Metal Roofing in Severely Corrosive Environments

    DTIC Science & Technology

    2012-03-01

    protection against water intrusion . The demonstrated sub-purlin framing system can be custom-fabricated with slot depth and spacing to nest over...makes it feasible to install a new SSSMR over a structurally sound metal roof that has failed in terms of corrosion and wa- ter intrusion . With careful...and retrofit sub-purlin framing system. Where extensive water intrusion has occurred, detailed inspection of the existing roof should be performed

  15. Northwest Open Automated Demand Response Technology Demonstration Project

    SciTech Connect

    Kiliccote, Sila; Dudley, Junqiao Han; Piette, Mary Ann

    2009-08-01

    Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) performed a technology demonstration and evaluation for Bonneville Power Administration (BPA) in Seattle City Light's (SCL) service territory. This report summarizes the process and results of deploying open automated demand response (OpenADR) in Seattle area with winter morning peaking commercial buildings. The field tests were designed to evaluate the feasibility of deploying fully automated demand response (DR) in four to six sites in the winter and the savings from various building systems. The project started in November of 2008 and lasted 6 months. The methodology for the study included site recruitment, control strategy development, automation system deployment and enhancements, and evaluation of sites participation in DR test events. LBNL subcontracted McKinstry and Akuacom for this project. McKinstry assisted with recruitment, site survey collection, strategy development and overall participant and control vendor management. Akuacom established a new server and enhanced its operations to allow for scheduling winter morning day-of and day-ahead events. Each site signed a Memorandum of Agreement with SCL. SCL offered each site $3,000 for agreeing to participate in the study and an additional $1,000 for each event they participated. Each facility and their control vendor worked with LBNL and McKinstry to select and implement control strategies for DR and developed their automation based on the existing Internet connectivity and building control system. Once the DR strategies were programmed, McKinstry commissioned them before actual test events. McKinstry worked with LBNL to identify control points that can be archived at each facility. For each site LBNL collected meter data and trend logs from the energy management and control system. The communication system allowed the sites to receive day-ahead as well as day-of DR test event signals. Measurement of DR was

  16. SNOX demonstration project: Volume 2, Project performance and economics. Final report

    SciTech Connect

    1996-07-01

    The SNOX process, developed by Haldor Topsoe A/S and demonstrated and marketed in North America by ABB Environmental Systems (ABBES), is an innovative process which removes both sulfur dioxide and nitrogen oxides from power plant flue gases. Sulfur dioxide is recovered as high purity, concentrated sulfuric acid and nitrogen oxides are converted to nitrogen gas and water vapor; no additional waste streams are produced. As part of the Clean Coal Technology Program, this project was demonstrated under joint sponsorship from the US Department of Energy, Ohio Coal Development Office, ABBES, Snamprogetti, and Ohio Edison. The project objective was to demonstrate the SO{sub 2}/NO{sub x} reduction efficiencies of the SNOX process on an electric power plant firing high-sulfur Ohio Coal. A 35-MWe demonstration has been conducted on a 108-MWe unit, Ohio Edison`s Niles Plant Unit 2, in Trumbull County, Ohio. The $31.4 million project began site preparation in November 1990 and commenced treating flue gas in March of 1992. A parametric test program has been completed. This report presents a description of the technology, results from the 33 month testing and operation phase, and information from a commercial scale economic evaluation. During the demonstration, the process met or exceeded its design goals of 95% SO{sub 2} removal, 90% NO{sub x} removal, and production of commercial grade (>93.2 wt.%) sulfuric acid. The plant was operated for approximately 8000 hours and produced more than 5600 tons of acid, which was purchased and distributed by a local supplier to end users. Projected economics for a 500 MWe commercial SNOX plant indicate a total capital requirement of 305 $/kW, levelized incremental cost of power at 6.1 mills/kWh, 219 $/ton of SO{sub 2} removed, and 198 $/ton of SO{sub 2}+NO{sub x} removed (all at constant dollars).

  17. 77 FR 66182 - TRICARE Over-the-Counter Drug Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-02

    ... demonstration project under 10 U.S.C. 1092 to allow certain over-the- counter (OTC) medications to be included... demonstration project continues to be authorized by 10 U.S.C. 1092. Dated: October 31, 2012. Aaron...

  18. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2005-09-30

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

  19. Status of U.S. FCEV and Infrastructure Learning Demonstration Project (Presentation)

    SciTech Connect

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

    2011-03-01

    Presented at the Japan Hydrogen and Fuel Cell Demonstration Project (JHFC), 1 March 2011, Tokyo, Japan. This presentation summarizes the status of U.S. fuel cell electric vehicles and infrastructure learning demonstration project.

  20. Advanced Flue Gas Desulfurization (AFGD) demonstration project: Volume 2, Project performance and economics. Final technical report

    SciTech Connect

    1996-04-30

    The project objective is to demonstrate removal of 90--95% or more of the SO{sub 2} at approximately one-half the cost of conventional scrubbing technology; and to demonstrate significant reduction of space requirements. In this project, Pure Air has built a single SO{sub 2} absorber for a 528-MWe power plant. The absorber performs three functions in a single vessel: prequencher, absorber, and oxidation of sludge to gypsum. Additionally, the absorber is of a co- current design, in which the flue gas and scrubbing slurry move in the same direction and at a relatively high velocity compared to conventional scrubbers. These features all combine to yield a state- of-the-art SO{sub 2} absorber that is more compact and less expensive than conventional scrubbers. The project incorporated a number of technical features including the injection of pulverized limestone directly into the absorber, a device called an air rotary sparger located within the base of the absorber, and a novel wastewater evaporation system. The air rotary sparger combines the functions of agitation and air distribution into one piece of equipment to facilitate the oxidation of calcium sulfite to gypsum. Additionally, wastewater treatment is being demonstrated to minimize water disposal problems inherent in many high-chloride coals. Bituminous coals primarily from the Indiana, Illinois coal basin containing 2--4.5% sulfur were tested during the demonstration. The Advanced Flue Gas Desulfurization (AFGD) process has demonstrated removal of 95% or more of the SO{sub 2} while providing a commercial gypsum by-product in lieu of solid waste. A portion of the commercial gypsum is being agglomerated into a product known as PowerChip{reg_sign} gypsum which exhibits improved physical properties, easier flowability and more user friendly handling characteristics to enhance its transportation and marketability to gypsum end-users.

  1. Urban Options Solar Greenhouse Demonstration Project. Final report

    SciTech Connect

    Cipparone, L.

    1980-10-15

    The following are included: the design process, construction, thermal performance, horticulture, educational activities, and future plans. Included in appendices are: greenhouse blueprints, insulating curtain details, workshop schedules, sample data forms, summary of performance calculations on the Urban Options Solar Greenhouse, data on vegetable production, publications, news articles on th Solar Greenhouse Project, and the financial statement. (MHR)

  2. Fair Start for Children: Lessons Learned from Seven Demonstration Projects.

    ERIC Educational Resources Information Center

    Larner, Mary, Ed.; And Others

    In the early 1980s, the Ford Foundation launched a grants program called Child Survival/A Fair Start for Children (CS/FS) that addressed issues related to birth and infant health and development among families that were poor and underserved by traditional human services. This book reports on each of seven CS/FS projects, describing the concerns…

  3. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    SciTech Connect

    Adamson, M. G.

    1997-10-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted.

  4. Integrated System Health Management (ISHM) Technology Demonstration Project Final Report

    NASA Technical Reports Server (NTRS)

    Mackey, Ryan; Iverson, David; Pisanich, Greg; Toberman, Mike; Hicks, Ken

    2006-01-01

    Integrated System Health Management (ISHM) is an essential capability that will be required to enable upcoming explorations mission systems such as the Crew Exploration Vehicle (CEV) and Crew Launch Vehicle (CLV), as well as NASA aeronautics missions. However, the lack of flight experience and available test platforms have held back the infusion by NASA Ames Research Center (ARC) and the Jet Propulsion Laboratory (JPL) of ISHM technologies into future space and aeronautical missions. To address this problem, a pioneer project was conceived to use a high-performance aircraft as a low-cost proxy to develop, mature, and verify the effectiveness of candidate ISHM technologies. Given the similarities between spacecraft and aircraft, an F/A-18 currently stationed at Dryden Flight Research Center (DFRC) was chosen as a suitable host platform for the test bed. This report describes how the test bed was conceived, how the technologies were integrated on to the aircraft, and how these technologies were matured during the project. It also describes the lessons learned during the project and a forward path for continued work.

  5. SITE DEMONSTRATION OF THE TORONTO HARBOUR COMMISSIONERS SOIL RECYCLING PROJECT

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA), in cooperation with the Toronto Harbour Commissioners (THC), conducted a Superfund InnovativeTechnology Evaluation (SITE) demonstration of the THC Soil Recycle Treatment Train. The treatment train consists of three technologies op...

  6. VREPAR projects: the use of virtual environments in psycho-neuro-physiological assessment and rehabilitation.

    PubMed

    Riva, G; Bacchetta, M; Baruffi, M; Borgomainerio, E; Defrance, C; Gatti, F; Galimberti, C; Fontaneto, S; Marchi, S; Molinari, E; Nugues, P; Rinaldi, S; Rovetta, A; Ferretti, G S; Tonci, A; Wann, J; Vincelli, F

    1999-01-01

    Due, in large part, to the significant advances in PC hardware that have been made over the last 3 years, PC-based virtual environments are approaching reality. Virtual Reality Environments for Psychoneurophysiological Assessment and Rehabilitation (VREPAR) are two European Community funded projects (Telematics for health-HC 1053/HC 1055, http:// www.psicologia.net) that are trying to develop a PC-based virtual reality system (PC-VRS) for the medical market that can be marketed at a price that is accessible to its possible endusers (hospitals, universities, and research centres) and that would have the modular, connectability, and interoperability characteristics that the existing systems lack. In particular, the projects are developing three hardware/software modules for the application of the PCVRS in psycho-neuro-physiological assessment and rehabilitation. The chosen development areas are eating disorders (bulimia, anorexia, and obesity), movement disorders (Parkinson's disease and torsion dystonia) and stroke disorders (unilateral neglect and hemiparesis). This article describes the rationale of the modules and the preliminary results obtained.

  7. Buhne Point Shoreline Erosion Demonstration Project. Volume 2. Appendices E.

    DTIC Science & Technology

    1987-08-01

    APPENDIX A Cost Estimates B Wave Data Statistics C Wind Data 3tatistics D Plates From F’revicus U.b. Corps Reports E Concfiptual Plens of Alternatc...4 3 Project Layout, Plan A ....................... 6 4 Typical Wave Pattern. Buhne Spit ........ 10 PLATES : Page I Local Wind...8217.CTION,HEIGHT B PERIOD to WIND rREQUENCY Ii DlS7ftiVa~lQd AOSW JULY 1939-OEC1,42UfiC *EATHqCaLUflCM gTA J*i~eeDC ~Y~tOD~avP PLATE I - P6 v:c-a ,nr

  8. 78 FR 38840 - Final Priority-National Institute on Disability and Rehabilitation Research-Rehabilitation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-28

    ... CFR Chapter III Final Priority--National Institute on Disability and Rehabilitation Research--Rehabilitation Research and Training Centers AGENCY: Office of Special Education and Rehabilitative Services... Rehabilitative Services announces a priority for the Disability and Rehabilitation Research Projects and...

  9. 78 FR 42868 - Final Priority; National Institute on Disability and Rehabilitation Research-Rehabilitation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-18

    ... CFR Chapter III Final Priority; National Institute on Disability and Rehabilitation Research--Rehabilitation Research and Training Centers AGENCY: Office of Special Education and Rehabilitative Services... Rehabilitative Services announces a priority for the Disability and Rehabilitation Research Projects and...

  10. Final priority. National Institute on Disability and Rehabilitation Research--Traumatic Brain Injury Model Systems Centers Collaborative Research Project. Final priority.

    PubMed

    2013-05-09

    The Assistant Secretary for Special Education and Rehabilitative Services announces a priority for the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR). Specifically, we announce a priority for a Disability and Rehabilitation Research Project (DRRP) on Traumatic Brain Injury Model Systems Centers Collaborative Research Project. The Assistant Secretary may use this priority for competitions in fiscal year (FY) 2013 and later years. We take this action to focus research attention on areas of national need. We intend this priority to improve outcomes among individuals with traumatic brain injuries.

  11. Lied Animal Shelter Animal campus Renewable Energy Demonstration Project

    SciTech Connect

    Randy Spitzmesser, AIA

    2005-11-22

    The Animal Shelter campus plan includes a new adoption center coupled with a dog adoption park, a wellness/veterinary technician education center, a show arena, and an addition to the existing shelter that will accommodate all animal control and sheltering for the Las Vegas Valley. The new facility will provide a sophisticated and innovative presentation of the animals to be adopted in an attempt to improve the public's perception of shelter animals. Additionally, the Regional Animal Campus will be a ''green building'', embodying a design intent on balancing environmental responsiveness, resource efficiency and cultural and community sensitivity. Designing an energy-efficient building helps reduce pollution from burning fossil fuels, reduce disturbance of natural habitats for the harvesting of resources and minimizes global warming. The project will be a leader in the use of renewable energy by relying on photovoltaic panels, wind turbines, and solar collectors to produce a portion of the project's energy needs The building will operate more efficiently in comparison to a typical shelter through the use of monitoring and specialized cooling/heating equipment. Windows bringing in natural daylight will reduce the center's demand for electricity.

  12. Green River Formation water flood demonstration project. Final report

    SciTech Connect

    Pennington, B.I.; Dyer, J.E.; Lomax, J.D. |; Deo, M.D.

    1996-11-01

    The objectives of the project were to understand the oil production mechanisms in the Monument Butte unit via reservoir characterization and reservoir simulations and to transfer the water flooding technology to similar units in the vicinity, particularly the Travis and the Boundary units. The reservoir characterization activity in the project basically consisted of extraction and analysis of a full diameter core, Formation Micro Imaging (FMI) logs from several wells and Magnetic Resonance Imaging (MRI) logs from two wells. In addition, several side-wall cores were drilled and analyzed, oil samples from a number of wells were physically and chemically characterized (using high-temperature gas chromatography), oil-water relative permeabilities were measured and pour points and cloud points of a few oil samples were determined. The reservoir modeling activity comprised of reservoir simulation of all the three units at different scales and near well-bore modeling of the wax precipitation effects. The reservoir simulation activities established the extent of pressurization of the sections of the reservoirs in the immediate vicinity of the Monument Butte unit. This resulted in a major expansion of the unit and the production from this expanded unit increased from about 300 barrels per day to about 2,000 barrels per day.

  13. SRC-I Project Baseline. [SRC-I demonstration project near Owensboro, Kentucky

    SciTech Connect

    1982-03-01

    The Process Design Criteria Specification forms the basis for process design for the 6000-TPSD SRC-I Demonstration Plant. It sets forth: basic engineering data, e.g., type and size of plant, feedstocks, product specifications, and atmospheric emission and waste disposal limits; utility conditions; equipment design criteria and sparing philosophy; and estimating criteria for economic considerations. Previously the formal ICRC Document No. 0001-01-002 has been submitted to DOE and revised, as necessary, to be consistent with the SRC-I Project Baseline. Revision 6, dated 19 March 1982, 51 pages, was forwarded to DOE on 19 March 1982.

  14. 76 FR 60007 - TRICARE Demonstration Project for the Philippines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-28

    ... locations specified by the government; a quality assessment program which will meet, at a minimum, the... be reimbursed under an established fee schedule. The providers will adhere to the quality of care... have sufficient access to high quality care. The demonstration would be conducted under 10 U.S.C....

  15. American Indian Telecommunications Satellite Demonstration Project. Summary Report.

    ERIC Educational Resources Information Center

    Lyndon B. Johnson Space Center, Houston, TX.

    The technical feasibility of voice and television communication within and between tribes, between tribes and federal agencies, and between educational institutions and tribes was demonstrated by broadcasts which took place April 10, 12, and 14, 1978, with equipment located at four sites: Crow Agency, Montana; All- Indian Culture Center, New…

  16. TREATMENT OF HIGHLY CONTAMINATED GROUNDWATER: A SITE DEMONSTRATION PROJECT

    EPA Science Inventory

    From 9-11/1994, the USEPA conducted a field demonstration of the remediation of highly contaminated groundwater at the Mascolite Superfund site located in Millville, NJ. Besides high concentrations of the major contaminant, methyl methacrylate (MMA), the groundwater also containe...

  17. Performance Analysis of XCPC Powered Solar Cooling Demonstration Project

    NASA Astrophysics Data System (ADS)

    Widyolar, Bennett K.

    A solar thermal cooling system using novel non-tracking External Compound Parabolic Concentrators (XCPC) has been built at the University of California, Merced and operated for two cooling seasons. Its performance in providing power for space cooling has been analyzed. This solar cooling system is comprised of 53.3 m2 of XCPC trough collectors which are used to power a 23 kW double effect (LiBr) absorption chiller. This is the first system that combines both XCPC and absorption chilling technologies. Performance of the system was measured in both sunny and cloudy conditions, with both clean and dirty collectors. It was found that these collectors are well suited at providing thermal power to drive absorption cooling systems and that both the coinciding of available thermal power with cooling demand and the simplicity of the XCPC collectors compared to other solar thermal collectors makes them a highly attractive candidate for cooling projects.

  18. Advanced Seismic Probabilistic Risk Assessment Demonstration Project Plan

    SciTech Connect

    Coleman, Justin

    2014-09-01

    Idaho National Laboratories (INL) has an ongoing research and development (R&D) project to remove excess conservatism from seismic probabilistic risk assessments (SPRA) calculations. These risk calculations should focus on providing best estimate results, and associated insights, for evaluation and decision-making. This report presents a plan for improving our current traditional SPRA process using a seismic event recorded at a nuclear power plant site, with known outcomes, to improve the decision making process. SPRAs are intended to provide best estimates of the various combinations of structural and equipment failures that can lead to a seismic induced core damage event. However, in general this approach has been conservative, and potentially masks other important events (for instance, it was not the seismic motions that caused the Fukushima core melt events, but the tsunami ingress into the facility).

  19. A-7 Airborne Light Optical Fiber Technology (ALOFT) Demonstration Project

    DTIC Science & Technology

    1977-02-03

    differentl foom Report) 15 UPLEMENTARY NOTES Il. K<EY’ WORDS (Continue on reverse side if nec.saary and Identity by block number) Fiber opticsI...and weapon-delivery system, electrical interface . page 5 2. Summary LCC results for A-7 alternative configurations ... 10 3. Side -by- side comparison... Side -by- side comparison, fiber-optic and electrical cables ... 12 INTROI)UCTION The Airborne Light Optical Fiber Technology (AL.OFT) demonstration was

  20. Next Generation Luminaire (NGL) Downlight Demonstration Project, Hilton Columbus Downtown

    SciTech Connect

    Davis, R. G.; Perrin, T. E.

    2014-09-30

    At the Hilton Columbus Downtown hotel in Ohio, DOE's Better Buildings Alliance conducted a demonstration of Next Generation Luminaires-winning downlights installed in all guest rooms and suites prior to the hotel's 2012 opening. After a post-occupancy assessment, the LED downlights not only provided the aesthetic appearance and dimming functionality desired, but also provided 50% energy savings relative to a comparable CFL downlight and enabled the lighting power to be more than 20% below that allowed by code.

  1. Exercise Countermeasures Demonstration Project During the Lunar-Mars Life Support Test Project Phase 2A

    NASA Technical Reports Server (NTRS)

    Lee, Stuart M. C.; Guilliams, Mark E.; Moore, Alan D., Jr.; Williams, W. Jon; Greenisen, M. C.; Fortney, S. M.

    1998-01-01

    This demonstration project assessed the crew members' compliance to a portion of the exercise countermeasures planned for use onboard the International Space Station (ISS) and the outcomes of their performing these countermeasures. Although these countermeasures have been used separately in other projects and investigations, this was the first time they'd been used together for an extended period (60 days) in an investigation of this nature. Crew members exercised every day for six days, alternating every other day between aerobic and resistive exercise, and rested on the seventh day. On the aerobic exercise days, subjects exercised on an electronically braked cycle ergometer using a protocol that has been previously shown to maintain aerobic capacity in subjects exposed to a space flight analogue. On the resistive exercise days, crew members performed five major multijoint resistive exercises in a concentric mode, targeting those muscle groups and bones we believe are most severely affected by space flight. The subjects favorably tolerated both exercise protocols, with a 98% compliance to aerobic exercise prescription and a 91% adherence to the resistive exercise protocol. After 60 days, the crew members improved their peak aerobic capacity by an average 7%, and strength gains were noted in all subjects. These results suggest that these exercise protocols can be performed during ISS, lunar, and Mars missions, although we anticipate more frequent bouts with both protocols for long-duration spaceflight. Future projects should investigate the impact of increased exercise duration and frequency on subject compliance, and the efficacy of such exercise prescriptions.

  2. LIFAC sorbent injection desulfurization demonstration project. Final report, volume II: Project performance and economics

    SciTech Connect

    1996-01-01

    This publication discusses the demonstration of the LIFAC sorbent injection technology at Richmond Power and Light`s Whitewater Valley Unit No. 2, performed under the auspices of the U.S. Department of Energy`s (DOE) Clean Coal Technology Program. LIFAC is a sorbent injection technology capable of removing 75 to 85 percent of a power plant`s SO{sub 2} emissions using limestone at calcium to sulfur molar ratios of between 2 and 2.5 to 1. The site of the demonstration is a coal-fired electric utility power plant located in Richmond, Indiana. The project is being conducted by LIFAC North America (LIFAC NA), a joint venture partnership of Tampella Power Corporation and ICF Kaiser Engineers, in cooperation with DOE, RP&L, and Research Institute (EPRI), the State of Indiana, and Black Beauty Coal Company. The purpose of Public Design Report Volume 2: Project Performance and Economics is to consolidate, for public use, the technical efficiency and economy of the LIFAC Process. The report has been prepared pursuant to the Cooperative Agreement No. DE-FC22-90PC90548 between LIFAC NA and the U.S. Department of Energy.

  3. Energy Storage/Conservation and Carbon Emissions Reduction Demonstration Project

    SciTech Connect

    Bigelow, Erik

    2013-01-01

    The U.S. Department of Energy (DOE) awarded the Center for Transportation and the Environment (CTE) federal assistance for the management of a project to develop and test a prototype flywheel-based energy recovery and storage system in partnership with Test Devices, Inc. (TDI). TDI specializes in the testing of jet engine and power generation turbines, which uses a great deal of electrical power for long periods of time. In fact, in 2007, the company consumed 3,498,500 kW-­hr of electricity in their operations, which is equivalent to the electricity of 328 households. For this project, CTE and TDI developed and tested a prototype flywheel-based energy recovery and storage system. This technology is being developed at TDI’s facilities to capture and reuse the energy necessary for the company’s core process. The new technology and equipment is expected to save approximately 80% of the energy used in the TDI process, reducing total annual consumption of power by approximately 60%, saving approximately two million kilowatt-hours annually. Additionally, the energy recycling system will allow TDI and other end users to lower their peak power demand and reduce associated utility demand charges. The use of flywheels in this application is novel and requires significant development work from TDI. Flywheels combine low maintenance costs with very high cycle life with little to no degradation over time, resulting in lifetimes measured in decades. All of these features make flywheels a very attractive option compared to other forms of energy storage, including batteries. Development and deployment of this energy recycling technology will reduce energy consumption during jet engine and stationary turbine development. By reengineering the current inefficient testing process, TDI will reduce risk and time to market of efficiency upgrades of gas turbines across the entire spectrum of applications. Once in place the results from this program will also help other US industries

  4. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. Annual report, 1988

    SciTech Connect

    Not Available

    1991-01-01

    This Annual Report on Colorado-Ute Electric Association`s NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration plan was completed. (VC)

  5. Demonstration Report: ESTCP UXO Discrimination Study ESTCP PROJECT # MM-0838

    SciTech Connect

    Gasperikova, Erika

    2010-02-15

    In 2003, the Defense Science Board observed: 'The problem is that instruments that can detect the buried UXOs also detect numerous scrap metal objects and other artifacts, which leads to an enormous amount of expensive digging. Typically 100 holes may be dug before a real UXO is unearthed! The Task Force assessment is that much of this wasteful digging can be eliminated by the use of more advanced technology instruments that exploit modern digital processing and advanced multi-mode sensors to achieve an improved level of discrimination of scrap from UXOs.' Significant progress has been made in discrimination technology. To date, testing of these approaches has been primarily limited to test sites with only limited application at live sites. Acceptance of discrimination technologies requires demonstration of system capabilities at real UXO sites under real world conditions. Any attempt to declare detected anomalies to be harmless and requiring no further investigation will require demonstration to regulators of not only individual technologies, but of an entire decision making process. This characterization study was be the second phase in what is expected to be a continuing effort that will span several years. The FY06 Defense Appropriation contained funding for the 'Development of Advanced, Sophisticated, Discrimination Technologies for UXO Cleanup' in the Environmental Security Technology Certification Program (ESTCP). ESTCP responded by conducting a UXO Discrimination Study at the former Camp Sibert, AL. The results of this first demonstration were very encouraging. Although conditions were favorable at this site, a single target of interest (4.2-in mortar) and benign topography and geology, all of the classification approaches demonstrated were able to correctly identify a sizable fraction of the anomalies as arising from non-hazardous items that could be safely left in the ground. To build upon the success of the first phase of this study, ESTCP sponsored a

  6. Real Time Technology Application Demonstration Project Final Report

    SciTech Connect

    Volpe, John; Hampson, Steve; Johnson, Robert L

    2008-09-01

    The work and results described in this final report pertain to the demonstration of real-time characterization technologies applied to potentially contaminated surface soils in and around Area of Concern (AOC) 492 at the Paducah Gaseous Diffusion Plant (PGDP). The work was conducted under the auspices of Kentucky Research Consortium for Energy and Environment (KRCEE). KRCEE was created to support the Department of Energy's (DOE) efforts to complete the expeditious and economically viable environmental restoration of the Paducah Gaseous Diffusion Plant (PGDP), the Western Kentucky Wildlife Management Area (WKWMA), and surrounding areas.

  7. Outcomes of an integrated telehealth network demonstration project.

    PubMed

    Dimmick, Susan L; Burgiss, Samuel G; Robbins, Sherry; Black, David; Jarnagin, Bertha; Anders, Mary

    2003-01-01

    An integrated telehealth network that linked three hospitals, a federally qualified health care clinic with six sites, a county dental clinic, and patient homes was developed and implemented using both private and federal funding. The goal of the network was to deliver 10 different medical, dental, and behavioral health services to a rural community. The network served patients from nine different counties and two states. Outcomes from the disease management programs for congestive heart failure and diabetes, as well as crisis telehealth and teledental health, were reported. Results for the diabetes disease management program increased the number of diabetics who brought their blood sugar under control. Additionally, based on hospital days per patient per year with and without intervention, and the cost of intervention by telehealth, it was projected that the national cost of care for CHF hospitalizations could be reduced from 8 billion dollars to 4.2 billion dollars. This telehealth network can serve as a model for integrating health services in each county of the state. Once each county had an integrated telehealth network, the county networks could be linked to provide regional services and coordination on a statewide basis.

  8. BACA Project: geothermal demonstration power plant. Final report

    SciTech Connect

    Not Available

    1982-12-01

    The various activities that have been conducted by Union in the Redondo Creek area while attempting to develop the resource for a 50 MW power plant are described. The results of the geologic work, drilling activities and reservoir studies are summarized. In addition, sections discussing the historical costs for Union's involvement with the project, production engineering (for anticipated surface equipment), and environmental work are included. Nineteen geothermal wells have been drilled in the Redondo Creek area of the Valles Caldera: a prominent geologic feature of the Jemez mountains consisting of Pliocene and Pleistocene age volcanics. The Redondo Creek area is within a complex longitudinal graben on the northwest flank of the resurgent structural dome of Redondo Peak and Redondo Border. The major graben faults, with associated fracturing, are geologically plausible candidates for permeable and productive zones in the reservoir. The distribution of such permeable zones is too erratic and the locations too imprecisely known to offer an attractive drilling target. Log analysis indicates there is a preferred mean fracture strike of N31W in the upper portion of Redondo Creek wells. This is approximately perpendicular to the major structure in the area, the northeast-striking Redondo Creek graben. The geothermal fluid found in the Redondo Creek reservoir is relatively benign with low brine concentrations and moderate H/sub 2/S concentrations. Geothermometer calculations indicate that the reservoir temperature generally lies between 500/sup 0/F and 600/sup 0/F, with near wellbore flashing occurring during the majority of the wells' production.

  9. Rationale, design, and methods for process evaluation in the Childhood Obesity Research Demonstration project

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The cross-site process evaluation plan for the Childhood Obesity Research Demonstration (CORD) project is described here. The CORD project comprises 3 unique demonstration projects designed to integrate multi-level, multi-setting health care and public health interventions over a 4-year funding peri...

  10. West Valley Demonstration Project full-scale canister impact tests

    SciTech Connect

    Whittington, K.F.; Alzheimer, J.M.; Lutz, C.E.

    1995-09-01

    Five West Valley Nuclear Services (WVNS) high-level waste (HLW) canisters were impact tested during 1994 to demonstrate compliance with the drop test requirements of the Waste Acceptance Product Specifications. The specifications state that the canistered waste form must be able to survive a 7{minus}m (23 ft) drop unbreached. The 10-gauge (0.125 in. wall thickness) stainless steel canisters were approximately 85% filled with simulated vitrified waste and weighed about 2100 kg (4600 lb). Each canister was dropped vertically from a height of 7 m (23 ft) onto an essentially unyielding surface. The integrity of the canister was determined by the application and analysis of strain circles, dimensional measurements, and helium leak testing. The canisters were also visually inspected before and after the drop for physical damage. The results of the impact test verify that the canisters survived the 7{minus}m drops unbreached. Therefore, these results demonstrate that the reference canister meets the drop test specification of the Waste Acceptance Product Specification.

  11. TIDD PFBC demonstration project. Quarterly report, January--March 1995

    SciTech Connect

    1995-04-01

    This is the thirty-second Technical Progress Report submitted to the Department of Energy in connection with the Cooperative Agreement between the DOE and the Ohio Power Company for the Tidd PFBC Demonstration Plant. This report covers the period from January 1, 1995 to March 31, 1995. Major Activities during this period include: The unit operated for 718 hours on coal, bringing the grand total for coal fire through the end of the quarter to 11,442 hours. There were seven gas turbine starts, nine bed preheater starts, and nine operating periods on coal. During this quarter, total gross generation was 57,693 MWH, the peak unit output for one hour was 74 MWH, and the coal consumption was 27,866 tons. Twelve performance tests were conducted during this quarter, bringing the total number of tests for the plant to 95. On March 30,1995, at 8:27 am, the Tidd PFBC Demonstration Plant was manually tripped for the last time.

  12. Hawaii Demonstration Project to Avert Unintended Teenage Pregnancy: 1978-1982. Final Report. Executive Summary.

    ERIC Educational Resources Information Center

    Levitt-Merin, Marta; Sutter, Sharon Kingdon

    This final report provides a descriptive overview of three approaches which the Hawaii Demonstration Project initiated to reduce unintended teenage pregnancies. Project evaluation findings are summarized; both qualitative and quantitative data are presented for a comprehensive picture of the project and its input. Project limitations and successes…

  13. ESTCP UXO Innovation Technology Transfer Project. ESTCP Project MM-0744: GEMTADS Demonstration at F.E. Warren AFB Demonstration Data Report

    DTIC Science & Technology

    2011-06-06

    GEMTADS Demonstration at F.E. Warren AFB Demonstration Data Report June 6, 2011 Approved for public release; distribution is unlimited. N. Khadr d.a...ESTCP Project MM-0744 GEMTADS Demonstration at F.E. Warren AFB Demonstration Data Report N. Khadr,* D.A. Keiswetter,* G.R. Harbaugh,† and D.A...within the boundary of the F.E. Warren AFB Closed Base Range MRA was conducted as part of the Environmental Security Technology Certification Program

  14. Forestry timber typing. Tanana demonstration project, Alaska ASVT. [Alaska

    NASA Technical Reports Server (NTRS)

    Morrissey, L. A.; Ambrosia, V. G.

    1982-01-01

    The feasibility of using LANDSAT digital data in conjunction with topographic data to delineate commercial forests by stand size and crown closure in the Tanana River basin of Alaska was tested. A modified clustering approach using two LANDSAT dates to generate an initial forest type classification was then refined with topographic data. To further demonstrate the ability of remotely sensed data in a fire protection planning framework, the timber type data were subsequently integrated with terrain information to generate a fire hazard map of the study area. This map provides valuable assistance in initial attack planning, determining equipment accessibility, and fire growth modeling. The resulting data sets were incorporated into the Alaska Department of Natural Resources geographic information system for subsequent utilization.

  15. Low NOx demonstration project at Gaojing Power Plant, Beijing, China

    SciTech Connect

    Verhoeff, F.; Kissing, B.J.; Bos, H.G.

    1997-12-31

    In November 1996 Stork Thermeq in the Netherlands received the order for the design, manufacture and commissioning of 12 coal/oil-fired low-NOx burners for the Gaojing Power Plant in Beijing, China. The aim of this burner retrofit is to decrease the NOx emission of this power plant and to demonstrate that, with leading-edge combustion technology, considerable reductions of NOx emissions are possible. In this paper a description of the low-NOx combustion technology is given, and field experiences with these burners installed in a new boiler and in a modified existing boiler will be highlighted. Further, insight will be given to the design and construction of the new burners for the Gaojing Power Plant and the results of reference measurements in this power plant will be presented.

  16. West Valley Demonstration Project full-scale canister impact tests

    SciTech Connect

    Whittington, K.F.; Lutz, C.E.

    1995-12-31

    Five West Valley Nuclear Services (WVNS) high-level waste (HLW) canisters were impact tested during 1994 to demonstrate compliance with the drop test requirements of the Waste Acceptance Product Specifications. The specifications state that the canistered waste form must be able to survive a 7-m (23 ft) drop unbreached. The 10-gauge stainless steel canisters were approximately 85% filled with simulated vitrified waste and weighed about 2100 kg (4600 lb). Each canister was dropped vertically from a height of 7 m (23 ft) onto an essentially unyielding surface. The integrity of the canister was determined by the application and analysis of strain circles, dimensional measurements, and helium leak testing. The canisters were also visually inspected before and after the drop for physical damage. After the impact, very little deformation of the canisters was observed. The strain circles deformed in the axial direction less than 3% and up to 7% in the hoop direction. The canisters on average showed a slight diameter increase of approximately 2% (1 to 2 cm) in the area nearest to the bottom head. The diameter only increased an average of 0.8% (0.5 cm) at the 76-cm elevation. The canister height decreased by an average of 0.4% (1.2 cm). Helium leak testing of each weld showed either no detectable leaks or very slight leaks much less than the acceptance criteria of 10{sup {minus}4} atm cc/sec. Each of the canisters passed the ``straightness`` test in which the canisters were fit into an inspection sleeve, a straight cylinder with a 63.5-cm (25 in) diameter, after the impact. The results of the impact test verify that the canisters survived the 7-m drops unbreached. Therefore, these results demonstrate that the reference canister meets the drop test specification of the Waste Acceptance Product Specification.

  17. Tidd PFBC Demonstration Project. Quarterly report, January--March 1994

    SciTech Connect

    Not Available

    1994-04-01

    This is the 28th Technical Progress Report submitted to the Department of Energy in connection with the Cooperative Agreement between the DOE and the Ohio Power Company for the Tidd PFBC Demonstration Plant. This report covers the period of January 1, 1994 to March 31, 1994. Major activities during this period include: (1) The unit operated for 850 hours on coal, bringing the grand total for coal fire through the end of the quarter to 6318 hours. (2) The unit availability for the first quarter was 40.1%. (3) There were twelve gas turbine starts, eight bed preheater starts, and six operating periods on coal. (4) During this quarter, total gross generation was 40,721 MWH, the peak unit output for one hour was 62 MWH, and the coal consumption was 19,370 tons. (5) Three performance tests were conducted during this quarter; and (6) the plant was able to remain in service during the sub-zero weather in January, providing power to the critically short grid.

  18. Final report on Thermally Modified Sand demonstration project

    SciTech Connect

    Not Available

    1994-09-23

    The use of salt and salt/sand mixtures on icy roadway surfaces has dramatically increased during the past 30 years. Despite extensive documentation on salt related damage to the roadway improvements, vehicles and the environment, road maintenance departments have continued to rely on this practice. Road maintenance departments in northern climate areas have long recognized the safety benefits for public mobility on icy roadways from the use of sand. As an abrasive material, the sand improves the surface traction that results in more drivable and less hazardous road conditions during the winter months. Stockpiles of pure sand stored during the winter months oftentimes freeze into large unworkable, monolithic piles. To maintain a free-flowing condition, it has been found to be necessary to add salt to the sand. The addition of salt in amounts ranging from 5 to 10 percent to that of sand, is usually sufficient to provide relatively free-flowing abrasive material that could be stored in stockpiles and applied to icy road surfaces with conventional sand spreading trucks. Another alternative for winter storage of pure sand to maintain a free-flowing condition is in humidity-controlled, heated buildings. As would be expected, this method has high capital and operating costs. and not cost effective for general highway maintenance use. The invention demonstrated herein is a method of thermally modifying pure sand that will remain in a free-flowing state throughout the winter season without the need for the salt additive. The thermally modified sand provides an abrasive material that when applied to icy roads does not cause environmental and corrosive damage as done by the application of sand with salt. By employing a very simple process of freezing screened sand particles by forced air convection under subfreezing conditions, the invention creates a product that has significant value in terms of economic and environmental benefits.

  19. 75 FR 15693 - Extension of Web-Based TRICARE Assistance Program Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-30

    ... of the Secretary Extension of Web-Based TRICARE Assistance Program Demonstration Project AGENCY: Department of Defense (DoD). ACTION: Notice of a Web-Based TRICARE Assistance Program demonstration project..., entitled Web-Based TRICARE Assistance Program. This demonstration was effective August 1, 2009,...

  20. Pilot project in developing community rehabilitation service for migrant workers suffering from pneumoconiosis in Mainland China.

    PubMed

    Lo, H Y L K; Luo, X Y; Lau, C M J; Wong, K Y L

    2008-01-01

    Pneumoconiosis is one of the major occupational health problems in China and increasing numbers of migrant workers suffered from this occupational disease after working in a dusty environment for few years. These migrant workers panicked after being diagnosed as suffering from pneumoconiosis and facing physiological disturbances including progressive dyspnea, respiratory failure or complications like silico-tuberculosis after their return to their rural village. This article reviews the preliminary results of a community rehabilitation pilot project conducted in a rural village in Guizhou, one of the provinces in southwest China. It shares the joint effort of professionals from Guangdong Province and Hong Kong SAR on supporting the migrant workers to manage and cope with this occupational disease. Finally, strategies including early intervention were suggested to help migrant workers to manage the disease. Most importantly, occupational health promotion and prevention were urged as the measures of utmost importance in reducing the risk for migrant workers suffering from pneumoconiosis.

  1. The ZOG Technology Demonstration Project: A System Evaluation of USS CARL VINSON (CVN 70)

    DTIC Science & Technology

    1984-12-01

    rNPRDC TR 85-14 DECEMBER 1984 ~JI 00o THE ZOG TECHNOLOGY DEMONSTRATION PROJECT : 00 A SYSTEM EVALUATION OF USS CARL VINSON ICVN 70) Lfl Reproduced...California 92152 NPR.DC TR 85-14 December 1984 THE ZOG TECHNOLOGY DEMONSTRATION PROJECT : A SYSTEM EVALUATION ON USS CARL VINSON (CVN 70) Nicholas H...ZOG TECHNOLOGY DEMONSTRATION PROJECT : A SYSTEM EVALUATION ON THE USS CARL VINSON (CVN 70) Van Matre, Nicholas; Moy, Melvyn, C.; McCann, Patrick, H

  2. Development of the Decontamination Approach for the West Valley Demonstration Project Decontamination Project Plan

    SciTech Connect

    Milner, T. N.; Watters, W. T.

    2002-02-25

    This paper details the development of a decontamination approach for the West Valley Demonstration Project (WVDP), Decontamination Project Plan (Plan). The WVDP is operated by West Valley Nuclear Services Company (WVNSCO), a subsidiary of Westinghouse Government and Environmental Services, and its parent companies Washington Group International and British Nuclear Fuels Limited (BNFL). The WVDP is a waste management effort being conducted by the United States Department of Energy (DOE) at the site of the only commercial nuclear fuel reprocessing facility to have operated in the United States. This facility is part of the Western New York Nuclear Service Center (WNYNSC), which is owned by the New York State Energy Research and Development Authority (NYSERDA). As authorized by Congress in 1980 through the West Valley Demonstration Project Act (WVDP Act, Public Law 96-368), the DOE's primary mission at the WVDP is to solidify high-level liquid nuclear waste safely; transport the high-level waste (HLW) to a federal repository; and decontaminate and decommission the facilities and hardware used to solidify the HLW and conduct the WVDP. This includes a provision for the disposal of low-level waste (LLW) and transuranic waste (TRU) produced during processing of the HLW. Continuation of the effort to reduce the hazard and risk associated with historic operations to the extent needed to ensure the health and safety of the public and the environment will see a change in focus from stabilization of liquid HLW to stabilization of former plutonium and uranium extraction (PUREX) reprocessing plant facilities. This will be achieved through the activities of in-cell component removal and packaging, and preparation for long-term disposal of the long- lived radionuclides. These radionuclides are associated with the former PUREX facility operations, including, and upstream from, facilities utilized in the primary separation and first plutonium/uranium split cycles. The closure

  3. 33 CFR 203.49 - Rehabilitation of Hurricane and Shore Protection Projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Rehabilitation of Hurricane and...: The Corps Rehabilitation and Inspection Program § 203.49 Rehabilitation of Hurricane and Shore... authorized hurricane or shore protection structure damaged or destroyed by wind, wave, or water action of...

  4. 33 CFR 203.49 - Rehabilitation of Hurricane and Shore Protection Projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Rehabilitation of Hurricane and...: The Corps Rehabilitation and Inspection Program § 203.49 Rehabilitation of Hurricane and Shore... authorized hurricane or shore protection structure damaged or destroyed by wind, wave, or water action of...

  5. 33 CFR 203.49 - Rehabilitation of Hurricane and Shore Protection Projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Rehabilitation of Hurricane and...: The Corps Rehabilitation and Inspection Program § 203.49 Rehabilitation of Hurricane and Shore... authorized hurricane or shore protection structure damaged or destroyed by wind, wave, or water action of...

  6. 33 CFR 203.49 - Rehabilitation of Hurricane and Shore Protection Projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Rehabilitation of Hurricane and...: The Corps Rehabilitation and Inspection Program § 203.49 Rehabilitation of Hurricane and Shore... authorized hurricane or shore protection structure damaged or destroyed by wind, wave, or water action of...

  7. 33 CFR 203.49 - Rehabilitation of Hurricane and Shore Protection Projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Rehabilitation of Hurricane and...: The Corps Rehabilitation and Inspection Program § 203.49 Rehabilitation of Hurricane and Shore... authorized hurricane or shore protection structure damaged or destroyed by wind, wave, or water action of...

  8. An analysis of the Cured-in-Place Pipe (CIPP) subproject of the sanitary sewer rehabilitation project

    SciTech Connect

    Morrow, W.; Siemiatkoski, S.

    1994-01-25

    The comprehensive rehabilitation of the Lawrence Livermore National Laboratory Sanitary Sewer System centers around a Cured-in-Place Pipe project. Driven by regulatory requirements to eliminate the potential for exfiltration, a careful condition assessment of the existing infrastructure was conducted. Under programmatic constraints to maintain continuous operations, the INLINER USA cured-in-place pipe system was selected as the appropriate technology, and the project is currently under contract.

  9. Demonstration and evaluation of an innovative water main rehabilitation technology: Cured-in-Place Pipe (CIPP) lining

    EPA Science Inventory

    As many water utilities are seeking new and innovative rehabilitation technologies to extend the life of their water distribution systems, information on the capabilities and applicability of new technologies is not always readily available from an independent source. The U.S. E...

  10. Demonstration of Benefits of Early Identification of Psychosocial Problems and Early Intervention Toward Rehabilitation of Cancer Patients. Final Report.

    ERIC Educational Resources Information Center

    Diller, Leonard; And Others

    Early identification of psychosocial problems and early intervention with cancer patients can be beneficial to patient rehabilitation. This report focusses on: (1) developing and implementing an effective "model program" of psychosocial intervention for adult cancer patients; (2) evaluating the impact of intervention in ameliorating cancer…

  11. Preprimary Traffic Safety Curriculum Demonstration Project, Evaluation Report, 1979-80.

    ERIC Educational Resources Information Center

    Claus, Richard N.; Quimper, Barry E.

    The Preprimary Traffic Safety Curriculum (PTSC) Demonstration Project is a three year project to develop, pilot test, and disseminate a traffic safety curriculum for young children. The PTSC Project has two general goals: to develop appropriate safety habits and attitudes in children, and to establish cooperation between home and school so that…

  12. Algebra Project DR K-12 Cohorts--Demonstration Project: Summative Evaluation Report

    ERIC Educational Resources Information Center

    St. John, Mark

    2014-01-01

    The Algebra Project DR K-12, funded by the National Science Foundation as a Research and Development Project, addressed the challenge of offering significant STEM content for students to ensure public literacy and workforce readiness. The project's primary purpose was to test the feasibility and effectiveness of a model for establishing four-year…

  13. Establishing optimal project-level strategies for pavement maintenance and rehabilitation - A framework and case study

    NASA Astrophysics Data System (ADS)

    Irfan, Muhammad; Bilal Khurshid, Muhammad; Bai, Qiang; Labi, Samuel; Morin, Thomas L.

    2012-05-01

    This article presents a framework and an illustrative example for identifying the optimal pavement maintenance and rehabilitation (M&R) strategy using a mixed-integer nonlinear programming model. The objective function is to maximize the cost-effectiveness expressed as the ratio of the effectiveness to the cost. The constraints for the optimization problem are related to performance, budget, and choice. Two different formulations of effectiveness are derived using treatment-specific performance models for each constituent treatment of the strategy; and cost is expressed in terms of the agency and user costs over the life cycle. The proposed methodology is demonstrated using a case study. Probability distributions are established for the optimization input variables and Monte Carlo simulations are carried out to yield optimal solutions. Using the results of these simulations, M&R strategy contours are developed as a novel tool that can help pavement managers quickly identify the optimal M&R strategy for a given pavement section.

  14. 45 CFR 2532.20 - Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-Kuskokwim Delta of Alaska. 2532.20 Section 2532.20 Public Welfare Regulations Relating to Public Welfare... § 2532.20 Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. (a) Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. The President may award grants to, and enter...

  15. 45 CFR 2532.20 - Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-Kuskokwim Delta of Alaska. 2532.20 Section 2532.20 Public Welfare Regulations Relating to Public Welfare... § 2532.20 Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. (a) Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. The President may award grants to, and enter...

  16. 45 CFR 2532.20 - Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-Kuskokwim Delta of Alaska. 2532.20 Section 2532.20 Public Welfare Regulations Relating to Public Welfare... § 2532.20 Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. (a) Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. The President may award grants to, and enter...

  17. 77 FR 22770 - Termination of Provider Reimbursement Demonstration Project for the State of Alaska

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-17

    ... of the Secretary Termination of Provider Reimbursement Demonstration Project for the State of Alaska... provides a termination of the demonstration project in the State of Alaska for individual provider payment... professional providers in the State of Alaska have been set at a rate higher than the Medicare rate. The...

  18. 78 FR 60887 - Expressions of Interest (EOI) for Chemical Defense Demonstration Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-02

    ... SECURITY Expressions of Interest (EOI) for Chemical Defense Demonstration Projects AGENCY: Office of Health Affairs, DHS. ACTION: Notice of Expression of Interest. SUMMARY: The Chemical Defense Program (CDP), under... chemical defense demonstration project relative to a specific venue (e.g., indoor sports stadium,...

  19. Organizing and Conducting Demonstration Projects in Vocational Education. Research and Development Series No. 117.

    ERIC Educational Resources Information Center

    Bina, James V.; Hull, William L.

    This resource book, designed as a planning tool for demonstration project directors, discusses the following six key elements which have application at all three stages of a demonstration project: (1) Objectives, (2) resources, (3) endorsement, (4) communications, (5) evaluation, and (6) outreach. Each of these elements is discussed within the…

  20. The Social Security Administration's Youth Transition Demonstration Projects: Interim Report on Transition WORKS

    ERIC Educational Resources Information Center

    Fraker, Thomas; Black, Alison; Mamun, Arif; Manno, Michelle; Martinez, John; O'Day, Bonnie; O'Toole, Meghan; Rangarajan, Anu; Reed, Debbie

    2011-01-01

    The Social Security Administration is funding a random assignment evaluation of six demonstration projects to improve employment and other outcomes for youth ages 14 to 25 who are either receiving disability benefits or are at high risk of receiving them in the future. This report reviews the Youth Transition Demonstration (YTD) projects, located…

  1. 78 FR 57623 - TRICARE Over-the-Counter Drug Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-19

    ... of the Secretary TRICARE Over-the-Counter Drug Demonstration Project AGENCY: Office of the Secretary, DoD. ACTION: Notice of modification to the TRICARE Over-the-Counter Drug Demonstration Project... which the Department of Defense (DoD) evaluates allowing selected over-the-counter (OTC) drugs to...

  2. 75 FR 8927 - Autism Services Demonstration Project for TRICARE Beneficiaries Under the Extended Care Health...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-26

    ... of the Secretary Autism Services Demonstration Project for TRICARE Beneficiaries Under the Extended...: This notice provides a 2-year extension of the Department of Defense Enhanced Access to Autism Services Demonstration Project under the Extended Care Health Option for beneficiaries diagnosed with an Autism...

  3. 20 CFR 416.1029 - Participation in research and demonstration projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Participation in research and demonstration projects. 416.1029 Section 416.1029 Employees' Benefits SOCIAL SECURITY ADMINISTRATION SUPPLEMENTAL... Responsibilities and Requirements § 416.1029 Participation in research and demonstration projects. We will...

  4. 5 CFR 470.305 - Submission of proposals for demonstration projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Submission of proposals for demonstration projects. 470.305 Section 470.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory...

  5. 5 CFR 470.305 - Submission of proposals for demonstration projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Submission of proposals for demonstration projects. 470.305 Section 470.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory...

  6. 5 CFR 470.305 - Submission of proposals for demonstration projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Submission of proposals for demonstration projects. 470.305 Section 470.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory...

  7. 5 CFR 470.305 - Submission of proposals for demonstration projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Submission of proposals for demonstration projects. 470.305 Section 470.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory...

  8. 5 CFR 470.305 - Submission of proposals for demonstration projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Submission of proposals for demonstration projects. 470.305 Section 470.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory...

  9. A Demonstration of the Constructibility of a Precast Concrete Stay-in-Place Forming System for Lock Wall Rehabilitation

    DTIC Science & Technology

    1987-12-01

    Precast Concrete Stay-in-Place Forming System for Lock Wall Rehabilivation 12. PERSONAL AUTHOR(S) 13.. TYPE OF REPORT 131. TIME COVEPED 14. DATE OF REPORT ...Year, Month, Day) IS. PAGE COUNT Final Report FROM ______TO he 7206 16. SUPPLEMENTARY NOTATION A report of the Concrete and Steel tructures problem...Rehabilitation (REMR) Research Program sponsored by HQUSACE. The Overview Committee at HQUSACE for the REMR Research Program consists of Messrs. James

  10. Commonwealth of Pennsylvania Adult Education Section 353 Special Demonstration Projects. Project Abstracts for the Fiscal Year 1997-1998.

    ERIC Educational Resources Information Center

    Pennsylvania State Dept. of Education, Harrisburg. Bureau of Adult Basic and Literacy Education.

    This document contains project abstracts for 29 adult basic and literacy education (ABLE) demonstration programs that were conducted in Pennsylvania in 1997-1998 through grants funded under Section 353 of the Adult Education Act. Each abstract includes the following: project name, number, purpose, impact, outcomes, conclusions/recommendations,…

  11. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA. U.S. EPA DEMONSTRATION PROJECT AT SPRINGFIELD, OH. PROJECT SUMMARY

    EPA Science Inventory

    This document is a eight page summary of the final report on arsenic demonstration project at the Chateau Estates Mobile Home Park in Springfield, OH. The objectives of the project are to evaluate the effectiveness of AdEdge Technologies’ AD-33 media in removing arsenic to meet t...

  12. Development of a 3-D Rehabilitation System for Upper Limbs Using ER Actuators in a Nedo Project

    NASA Astrophysics Data System (ADS)

    Furusho, Junji; Koyanagi, Ken'ichi; Nakanishi, Kazuhiko; Ryu, Ushio; Takenaka, Shigekazu; Inoue, Akio; Domen, Kazuhisa; Miyakoshi, Koichi

    New training methods and exercises for upper limbs rehabilitation are made possible by application of robotics and virtual reality technology. The technologies can also make quantitative evaluations and enhance the qualitative effect of training. We have joined a project managed by NEDO (New Energy and Industrial Technology Development Organization as a semi-governmental organization under the Ministry of Economy, Trade and Industry of Japan) 5-year Project, "Rehabilitation System for the Upper Limbs and Lower Limbs", and developed a 3-DOF exercise machine for upper limbs (EMUL) using ER actuators. In this paper, we also present the development of software for motion exercise trainings and some results of clinical evaluation. Moreover, it is discussed how ER actuators ensure the mechanical safety.

  13. Application of Wind Fetch and Wave Models for Habitat Rehabilitation and Enhancement Projects

    USGS Publications Warehouse

    Rohweder, Jason J.; Rogala, James T.; Johnson, Barry L.; Anderson, Dennis; Clark, Steve; Chamberlin, Ferris; Runyon, Kip

    2008-01-01

    Models based upon coastal engineering equations have been developed to quantify wind fetch length and several physical wave characteristics including significant height, length, peak period, maximum orbital velocity, and shear stress. These models, developed using Environmental Systems Research Institute's ArcGIS 9.2 Geographic Information System platform, were used to quantify differences in proposed island construction designs for three Habitat Rehabilitation and Enhancement Projects (HREPs) in the U.S. Army Corps of Engineers St. Paul District (Capoli Slough and Harpers Slough) and St. Louis District (Swan Lake). Weighted wind fetch was calculated using land cover data supplied by the Long Term Resource Monitoring Program (LTRMP) for each island design scenario for all three HREPs. Figures and graphs were created to depict the results of this analysis. The difference in weighted wind fetch from existing conditions to each potential future island design was calculated for Capoli and Harpers Slough HREPs. A simplistic method for calculating sediment suspension probability was also applied to the HREPs in the St. Paul District. This analysis involved determining the percentage of days that maximum orbital wave velocity calculated over the growing seasons of 2002-2007 exceeded a threshold value taken from the literature where fine unconsolidated sediments may become suspended. This analysis also evaluated the difference in sediment suspension probability from existing conditions to the potential island designs. Bathymetric data used in the analysis were collected from the LTRMP and wind direction and magnitude data were collected from the National Oceanic and Atmospheric Administration, National Climatic Data Center.

  14. [From Science to Law: Findings of Reha XI Project on Ascertaining the Need for Rehabilitation in Medical Service Assessments].

    PubMed

    Kalwitzki, T; Huter, K; Runte, R; Breuninger, K; Janatzek, S; Gronemeyer, S; Gansweid, B; Rothgang, H

    2016-05-02

    Introduction: In the broad-based consortium project "Reha XI - Identifying rehabilitative requirements in medical service assessments: evaluation and implementation", a comprehensive analysis of the corresponding procedures was carried out by the medical services of the German Health Insurance Funds (MDK). On the basis of this analysis, a Good Practice Standard (GPS) for assessments was drawn up and scientifically evaluated. This article discusses the findings and applicability of the GPS as the basis for a nationwide standardized procedure in Germany as required by the Second Act to Strengthen Long-Term Care (PSG II) under Vol. XI Para. 18 (6) of the German Social Welfare Code. Method: The consortium project comprised four project phases: 1. Qualitative and quantitative situation analysis of the procedures for ascertaining rehabilitative needs in care assessments carried out by the MDK; 2. Development of a Good Practice Standard (GPS) in a structured, consensus-based procedure; 3. Scientific evaluation of the validity, reliability and practicability of the assessment procedure according to the GPS in the MDK's operational practice; 4. Survey of long-term care insurance funds with respect to the appropriateness of the rehabilitation recommendations drawn up by care assessors in line with the GPS for providing a qualified recommendation for the applicant. The evaluation carried out in the third project phase was subject to methodological limitations that may have given rise to distortions in the findings. Findings: On the basis of the situation analysis, 7 major thematic areas were identified in which improvements were implemented by applying the GPS. For the evaluation of the GPS, a total of 3 247 applicants were assessed in line with the GPS; in 6.3% of the applicants, an indication for medical rehabilitation was determined. The GPS procedure showed a high degree of reliability and practicability, but the values for the validity of the assessment procedure were

  15. Learning through a portfolio of carbon capture and storage demonstration projects

    NASA Astrophysics Data System (ADS)

    Reiner, David M.

    2016-01-01

    Carbon dioxide capture and storage (CCS) technology is considered by many to be an essential route to meet climate mitigation targets in the power and industrial sectors. Deploying CCS technologies globally will first require a portfolio of large-scale demonstration projects. These first projects should assist learning by diversity, learning by replication, de-risking the technologies and developing viable business models. From 2005 to 2009, optimism about the pace of CCS rollout led to mutually independent efforts in the European Union, North America and Australia to assemble portfolios of projects. Since 2009, only a few of these many project proposals remain viable, but the initial rationales for demonstration have not been revisited in the face of changing circumstances. Here I argue that learning is now both more difficult and more important given the slow pace of deployment. Developing a more coordinated global portfolio will facilitate learning across projects and may determine whether CCS ever emerges from the demonstration phase.

  16. UCA{trademark} demonstration project at United Power Association. Final report

    SciTech Connect

    1997-12-01

    Integrated communications, field device interfaces, and control center operations are key aspects of successful distribution automation projects. This project demonstrated substation, feeder, and customer automation functions supported by twelve vendors using EPRI`s Utility Communications Architecture (UCA{trademark}) in an end-to-end implementation of the UCA 2.0 standard. A key project highlight was the ability of the vendor team to achieve the common goal of UCA implementation in a distribution automation setting.

  17. Monitoring Post-Fire Vegetation Rehabilitation Projects: A Common Approach for Non-Forested Ecosystems

    USGS Publications Warehouse

    Wirth, Troy A.; Pyke, David A.

    2007-01-01

    Emergency Stabilization and Rehabilitation (ES&R) and Burned Area Emergency Response (BAER) treatments are short-term, high-intensity treatments designed to mitigate the adverse effects of wildfire on public lands. The federal government expends significant resources implementing ES&R and BAER treatments after wildfires; however, recent reviews have found that existing data from monitoring and research are insufficient to evaluate the effects of these activities. The purpose of this report is to: (1) document what monitoring methods are generally used by personnel in the field; (2) describe approaches and methods for post-fire vegetation and soil monitoring documented in agency manuals; (3) determine the common elements of monitoring programs recommended in these manuals; and (4) describe a common monitoring approach to determine the effectiveness of future ES&R and BAER treatments in non-forested regions. Both qualitative and quantitative methods to measure effectiveness of ES&R treatments are used by federal land management agencies. Quantitative methods are used in the field depending on factors such as funding, personnel, and time constraints. There are seven vegetation monitoring manuals produced by the federal government that address monitoring methods for (primarily) vegetation and soil attributes. These methods vary in their objectivity and repeatability. The most repeatable methods are point-intercept, quadrat-based density measurements, gap intercepts, and direct measurement of soil erosion. Additionally, these manuals recommend approaches for designing monitoring programs for the state of ecosystems or the effect of management actions. The elements of a defensible monitoring program applicable to ES&R and BAER projects that most of these manuals have in common are objectives, stratification, control areas, random sampling, data quality, and statistical analysis. The effectiveness of treatments can be determined more accurately if data are gathered using

  18. Innovative Remediation Technologies: Field-Scale Demonstration Projects in North America, 2nd Edition

    EPA Pesticide Factsheets

    This report consolidates key reference information in a matrix that allows project mangers to quickly identify new technologies that may answer their cleanup needs and contacts for obtaining technology demonstration results and other information.

  19. FCV Learning Demonstration: Project Midpoint Status and First-Generation Vehicle Results; Preprint

    SciTech Connect

    Wipke, K.; Sprik, S.; Kurtz, J.; Thomas, H.; Garbak, J.

    2007-12-01

    This paper covers the progress accomplished by the U.S. DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project since inception, including results from analysis of six months of new data.

  20. 78 FR 64204 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-28

    ... of the Secretary Science and Technology Reinvention Laboratory Personnel Management Demonstration Project, Department of Navy, Office of Naval Research (ONR); Amendment and Corrections AGENCY: Deputy...: Office of Naval Research: Ms. Margaret J. Mitchell, Director, Human Resources Office, Office of...

  1. 76 FR 14099 - Proposed Collection of Information for an Evaluation of the Young Parents Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-15

    ... Parents Demonstration Project (YPDP); Comment Request AGENCY: Employment and Training Administration (ETA... of young parents and, ultimately their employment and earnings. DATES: Written comments must be... to test innovative strategies that can improve the skills and education of young parents...

  2. Jicarilla Apache Tribe: greenhouse renovation and demonstration project. Final technical report

    SciTech Connect

    Martinez, L. Jr.

    1980-09-30

    This report describes briefly the construction phase, instructional phase, bedding plant phase, and tomato production phase of a passive solar greenhouse renovation and demonstration project. Some data on the performance and heat savings are included.

  3. Evaluating a "Second Life" Problem-Based Learning (PBL) Demonstrator Project: What Can We Learn?

    ERIC Educational Resources Information Center

    Beaumont, Chris; Savin-Baden, Maggi; Conradi, Emily; Poulton, Terry

    2014-01-01

    This article reports the findings of a demonstrator project to evaluate how effectively Immersive Virtual Worlds (IVWs) could support problem-based learning. The project designed, created and evaluated eight scenarios within "Second Life" (SL) for undergraduate courses in health care management and paramedic training. Evaluation was…

  4. The NEPAD e-Schools Demonstration Project: A Work in Progress. A Public Report

    ERIC Educational Resources Information Center

    Farrell, Glen; Isaacs, Shafika; Trucano, Michael

    2007-01-01

    The NEPAD e-Schools Initiative is a multi-country, multi-stakeholder, continental project to teach ICT skills to young Africans in primary and secondary schools and improve the provision of education in schools through the use of ICT applications and the Internet. The first phase of the Initiative is a "Demonstration Project"…

  5. St. Louis' Vocabulary Development Project: A Report on the 1968-69 Demonstration.

    ERIC Educational Resources Information Center

    Tanis, David; And Others

    The Vocabulary Development Project (VDP) was a pilot study designed to demonstrate that significant improvement in language skills is possible with a sustained, massive program of vocabulary exercises. The subjects were inner-city fourth, fifth, and sixth graders. As this project was not a full-blown experimental study, a control…

  6. 42 CFR 403.308 - State systems under demonstration projects-mandatory approval.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false State systems under demonstration projects-mandatory approval. 403.308 Section 403.308 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS SPECIAL PROGRAMS AND PROJECTS Recognition of...

  7. 2 kWe Solar Dynamic Ground Test Demonstration Project. Volume 3; Fabrication and Test Report

    NASA Technical Reports Server (NTRS)

    Alexander, Dennis

    1997-01-01

    The Solar Dynamic Ground Test Demonstration (SDGTD) project has successfully designed and fabricated a complete solar-powered closed Brayton electrical power generation system and tested it in a relevant thermal vacuum facility at NASA Lewis Research Center (LeRC). In addition to completing technical objectives, the project was completed 3-l/2 months early, and under budget.

  8. Starting Right: Early Intervention Demonstration Projects, July 1989 to December 1990. Interim Report.

    ERIC Educational Resources Information Center

    Koroloff, Nancy

    This report describes four demonstration projects, funded from July 1989 to December 1990 in Oregon, on early identification and prevention of mental and emotional disorders in children. The intention of the projects was to find ways to identify children at risk of suffering emotional disorders and to intervene early enough to prevent these…

  9. YouthBuild in Developmental Perspective. A Formative Evaluation of the YouthBuild Demonstration Project.

    ERIC Educational Resources Information Center

    Ferguson, Ronald F.; Clay, Philip L.; Snipes, Jason C.; Roaf, Phoebe

    This report is a formative evaluation of the YouthBuild Demonstration Project that began in 1991 and ended in 1994. The YouthBuild Model, developed in earlier programs, was directed at young people who were largely disconnected from schools and jobs. Major components of the project were counseling, academic remediation with preparation for the…

  10. Demonstration Project Relating to Stress Analysis of SWAGE-Autofrettaged and Re-Autofrettaged Gun Tubes

    DTIC Science & Technology

    2008-05-23

    Final Report DEMONSTRATION PROJECT RELATING TO STRESS ANALYSIS OF SWAGE -AUTOFRETTAGED AND RE-AUTOFRETTAGED GUN TUBES Principal...2008 2. REPORT TYPE 3. DATES COVERED 07-08-2007 to 27-05-2008 4. TITLE AND SUBTITLE Demonstration Project Relating to Stress Analysis of SWAGE ...from a dummy swage autofrettage FEA stress analysis in a non-linear stress analysis of the post heat treatment hydraulic re-autofrettage of a swaged

  11. Public perception of an ecological rehabilitation project in inland river basins in northern China: Success or failure.

    PubMed

    Feng, Qi; Miao, Zheng; Li, Zongxing; Li, Jianguo; Si, Jianhua; S, Yonghong; Chang, Zongqiang

    2015-05-01

    The need for environmental protection challenges societies to deal with difficult problems because strategies designed by scientists to protect the environment often create negative effects on impoverished local residents. We investigated the effects of China's national and regional policies related to environmental protection and rehabilitation projects in inland river basins, by studying the effect of projects in the Heihe and Shiyang river basins, in northwest China. Interviews and surveys were conducted at 30 sites in the lower reaches of these two arid basins, an area that has experienced severe ecological degradation. The survey results show the ecological rehabilitation projects adversely affected the livelihoods of 70.35% of foresters, 64.89% of farmers and 62.24% of herders in the Minqing region in the lower Shiyang River Basin; also, the projects negatively affected 51.9% of residents in the Ejin Qi in the lower Heihe River Basin. This caused 16.33% of foresters, 39.90% of farmers and 45.32% of herders in the Minqing region to not support the project and 37.5% of residents in the Ejin Qi region said they will deforest and graze again after the project ends. The negative impacts of the policies connected to the projects cause these attitudes. The projects prohibit felling and grazing and require residents to give up groundwater mining; this results in a great amount of uncompensated economic loss to them. Extensive survey data document the concerns of local residents, concerns that are supported by the calculation of actual incomes. In addition, the surveys results show poorer interviewees believe the projects greatly affected their livelihoods. While citizens in this region support environment protection work, the poor require considerable assistance if one expects them to support this type of work. Governmental assistance can greatly improve their living conditions, and hence encourage them to participate in and support the implementation of the projects

  12. Reach Out for Literacy. Project Manual. A 353 Special Demonstration Project.

    ERIC Educational Resources Information Center

    Durbin, Roberta; And Others

    This document explains how to conduct programs similar to the Broward County, Florida, "Reach Out for Literacy" (ROL) project aimed at providing basic skills education for undereducated adults and adults with limited English proficiency. The introduction lists the objectives for the ROL program and reports the number of adults (689 at 17…

  13. Demonstrating artificial intelligence for space systems - Integration and project management issues

    NASA Technical Reports Server (NTRS)

    Hack, Edmund C.; Difilippo, Denise M.

    1990-01-01

    As part of its Systems Autonomy Demonstration Project (SADP), NASA has recently demonstrated the Thermal Expert System (TEXSYS). Advanced real-time expert system and human interface technology was successfully developed and integrated with conventional controllers of prototype space hardware to provide intelligent fault detection, isolation, and recovery capability. Many specialized skills were required, and responsibility for the various phases of the project therefore spanned multiple NASA centers, internal departments and contractor organizations. The test environment required communication among many types of hardware and software as well as between many people. The integration, testing, and configuration management tools and methodologies which were applied to the TEXSYS project to assure its safe and successful completion are detailed. The project demonstrated that artificial intelligence technology, including model-based reasoning, is capable of the monitoring and control of a large, complex system in real time.

  14. The implementation of the Human Exploration Demonstration Project (HEDP), a systems technology testbed

    NASA Technical Reports Server (NTRS)

    Rosen, Robert; Korsmeyer, David J.

    1993-01-01

    The Human Exploration Demonstration Project (HEDP) is an ongoing task at the NASA's Ames Research Center to address the advanced technology requirements necessary to implement an integrated working and living environment for a planetary surface habitat. The integrated environment consists of life support systems, physiological monitoring of project crew, a virtual environment work station, and centralized data acquisition and habitat systems health monitoring. The HEDP is an integrated technology demonstrator, as well as an initial operational testbed. There are several robotic systems operational in a simulated planetary landscape external to the habitat environment, to provide representative work loads for the crew. This paper describes the evolution of the HEDP from initial concept to operational project; the status of the HEDP after two years; the final facilities composing the HEDP; the project's role as a NASA Ames Research Center systems technology testbed; and the interim demonstration scenarios that have been run to feature the developing technologies in 1993.

  15. Step by Step': A Community Based Rehabilitation Project with Disabled Children in Guyana. Bilingual Version = Pas a pas: Un project de readaptation a base communautaire pour les enfants handicapes en Guyane. Version bilingue. Notes, Comments...No. 189.

    ERIC Educational Resources Information Center

    O'Toole, Brian

    The document, in both English and French, describes a 2-year project in Guyana based on the principle of community-based rehabilitation (CBR), which stresses training local community residents as supervisors to provide training of rehabilitation workers and direct services to children with disabilities living in rural areas. The program provided…

  16. TVA commercial demonstration plant project. Volume 2. Basis of study assessments and project selection. Final report

    SciTech Connect

    Not Available

    1980-11-01

    The Tennessee Valley Authority (TVA) is considering the design, construction, and operation of a commercial scale coal gasification facility to produce a clean, medium Btu fuel gas (MBG). The project includes all process and support systems required to convert approximately 20,000 tons per day of Kentucky No. 9 bituminous coal, as fed to the gasifiers, into MBG equivalent to about 300 billion Btu per day. The first phase of the proposed project involves conceptual design, environmental and siting studies and economic analyses of commercial plants emphasizing the following gasification technologies: Babcock and Wilcox entrained flow gasifier, Lurgi dry ash gasifier, BGC/Lurgi slagging gasifier, Texaco entrained flow gasifier, and Koppers Totzek entrained flow gasifier. Foster Wheeler's study and assessments/process selection is summarized in this volume.

  17. 76 FR 80903 - Extension of Autism Services Demonstration Project for TRICARE Beneficiaries Under the Extended...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... of the Secretary Extension of Autism Services Demonstration Project for TRICARE Beneficiaries Under.... SUMMARY: This notice provides a 2-year extension of the Department of Defense Enhanced Access to Autism... Autism Spectrum Disorder (ASD). Under the demonstration, the Department implemented a provider model...

  18. Project A+ Elementary Technology Demonstration Schools 1990-91. The First Year.

    ERIC Educational Resources Information Center

    Marable, Paula; Frazer, Linda

    Project A+ Elementary Technology Demonstration Schools is a program made possible through grants from IBM (International Business Machines Corporation) and Apple, Inc. The primary purpose of the program is to demonstrate the educational effectiveness of technology in accelerating the learning of low achieving at-risk students and enhancing the…

  19. The Nucla Circulating Fluidized-Bed Demonstration Project: A U.S. DOE post-project assessment

    SciTech Connect

    1995-06-01

    This report is a post-project assessment of the Nucla Circulating Fluidized-Bed (CFB) Demonstration Project, the second project to be completed in the DOE Clean Coal Technology Program. Nucla was the first successful utility repowering project in the US, increasing the capacity of the original power station from 36 MW(e) to 110 MW(e) and extending its life by 30 years. In the CFB boiler, combustion and desulfurization both take place in the fluidized bed. Calcium in the sorbent captures sulfur dioxide and the relatively low combustion temperatures limit NOx formation. Hot cyclones separate the larger particles from the gas and recirculates them to the lower zones of the combustion chambers. This continuous circulation of coal char and sorbent particles is the novel feature of CFB technology. This demonstration project significantly advanced the environmental, operational, and economic potential of atmospheric CFB technology, precipitating a large number of orders for atmospheric CFB equipment. By 1994, more than 200 atmospheric CFB boilers have been constructed worldwide. Although at least six CFB units have been operated, the Nucla project`s CFB database continues to be an important and unique resource for the design of yet larger atmospheric CFB systems. The post-project assessment report is an independent DOE appraisal of the success a completed project had in achieving its objectives and aiding in the commercialization of the demonstrated technology. The report also provides an assessment of the expected technical, environmental, and economic performance of the commercial version of the technology as well as an analysis of the commercial market.

  20. Application of Wind Fetch and Wave Models for Habitat Rehabilitation and Enhancement Projects

    USGS Publications Warehouse

    Rohweder, Jason J.; Rogala, James T.; Johnson, Barry L.; Anderson, Dennis; Clark, Steve; Chamberlin, Ferris

    2012-01-01

    Models based upon coastal engineering equations have been developed to quantify wind fetch length and several physical wave characteristics including significant height, length, peak period, maximum orbital velocity, and shear stress. These models were used to quantify differences in proposed island construction designs for three Habitat Rehabilitation and Enhancement Projects (HREPs) in the U.S. Army Corps of Engineers St. Paul District (Capoli Slough and Harpers Slough) and St. Louis District (Swan Lake). Weighted wind fetch was calculated using land cover data supplied by the Long Term Resource Monitoring Program (LTRMP) for each island design scenario for all three HREPs. Figures and graphs were created to depict the results of this analysis. The difference in weighted wind fetch from existing conditions to each potential future island design was calculated for Capoli and Harpers Slough HREPs. A simplistic method for calculating sediment suspension probability was also applied to the HREPs in the St. Paul District. This analysis involved determining the percentage of days that maximum orbital wave velocity calculated over the growing seasons of 2002–2007 exceeded a threshold value taken from the literature where fine unconsolidated sediments may become suspended. This analysis also evaluated the difference in sediment suspension probability from existing conditions to the potential island designs. Bathymetric data used in the analysis were collected from the LTRMP and wind direction and magnitude data were collected from the National Oceanic and Atmospheric Administration, National Climatic Data Center. These models are scheduled to be updated to operate using the most current Environmental Systems Research Institute ArcGIS Geographic Information System platform, and have several improvements implemented to wave calculations, data processing, and functions of the toolbox.

  1. LARGE-SCALE DEMONSTRATION AND DEPLOYMENT PROJECT-TECHNOLOGY INFORMATION SYSTEM (LSDDP-TIS)

    SciTech Connect

    M.A. Ebadian, Ph.D.

    1999-01-01

    In recent years, an increasing demand for remediation technologies has fueled rapid growth in the D&D technologies. The D&D project managers are now faced with the task of selecting from among the many commercially available and innovative technologies, the most appropriate technology, or combination of technologies, that will address their specific D&D needs. The DOE's Office of Science and Technology (OST) sponsored the Large-Scale Demonstration and Deployment Projects (LSDDP) to demonstrate improved and innovative technologies that are potentially beneficial to DOE's environmental project. To date, three LSDDPS have been conducted at DOE's nuclear production and research facilities at the Fernald Environmental Management Project--Plant-1 (FEMP), Chicago Pile-5 Research Reactor (CP-5), and Hanford Production Reactor 105-C, Now four new LSDDPS have been launched at the Los Alamos National Laboratory (LANL), Idaho National Engineering and Environmental Laboratory (INEEL), Savannah River Site (SRS), and Mound Environmental Management Project (MEMP). In the LSDDPS, an extensive search is first conducted to identify candidate technologies that can potentially address the identified problems The candidate technologies then go through a screening process to select those technologies with the best potential for addressing remediation problems at the LSDDP site as well as project sites across the DOE complex. This selection process can be overwhelming and time-consuming. The result is that D&D project managers for the new LSDDPS are challenged to avoid duplication of demonstrated technologies.

  2. Pacific Northwest GridWise™ Testbed Demonstration Projects; Part I. Olympic Peninsula Project

    SciTech Connect

    Hammerstrom, Donald J.; Ambrosio, Ron; Carlon, Teresa A.; DeSteese, John G.; Horst, Gale R.; Kajfasz, Robert; Kiesling, Laura L.; Michie, Preston; Pratt, Robert G.; Yao, Mark; Brous, Jerry; Chassin, David P.; Guttromson, Ross T.; Jarvegren, Olof M.; Katipamula, Srinivas; Le, N. T.; Oliver, Terry V.; Thompson, Sandra E.

    2008-01-09

    This report describes the implementation and results of a field demonstration wherein residential electric water heaters and thermostats, commercial building space conditioning, municipal water pump loads, and several distributed generators were coordinated to manage constrained feeder electrical distribution through the two-way communication of load status and electric price signals. The field demonstration took place in Washington and Oregon and was paid for by the U.S. Department of Energy and several northwest utilities. Price is found to be an effective control signal for managing transmission or distribution congestion. Real-time signals at 5-minute intervals are shown to shift controlled load in time. The behaviors of customers and their responses under fixed, time-of-use, and real-time price contracts are compared. Peak loads are effectively reduced on the experimental feeder. A novel application of portfolio theory is applied to the selection of an optimal mix of customer contract types.

  3. Reducing Plug Loads in Office Spaces: Hawaii and Guam Energy Improvement Technology Demonstration Project

    SciTech Connect

    Sheppy, M.; Metzger, I.; Cutler, D.; Holland, G.; Hanada, A.

    2014-01-01

    As part of its overall strategy to meet its energy goals, the Naval Facilities Engineering Command (NAVFAC) partnered with the Department of Energy's National Renewable Energy Laboratory (NREL) to rapidly demonstrate and deploy cost-effective renewable energy and energy efficiency technologies. This project was one of several demonstrations of new or underutilized commercial energy technologies. The common goal was to demonstrate and measure the performance and economic benefit of the system while monitoring any ancillary impacts to related standards of service and operation and maintenance (O&M) practices. In short, demonstrations at naval facilities simultaneously evaluate the benefits and compatibility of the technology with the U.S. Department of Defense (DOD) mission, and with NAVFAC's design, construction, operations, and maintenance practices, in particular. This project demonstrated the performance of commercially available advanced power strips (APSs) for plug load energy reductions in building A4 at Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii.

  4. Baker-Barry Tunnel Lighting: Evaluation of a Potential GATEWAY Demonstrations Project

    SciTech Connect

    Tuenge, Jason R.

    2011-06-01

    The U.S. Department of Energy (DOE) is evaluating the Baker-Barry Tunnel as a potential GATEWAY Demonstrations project for deployment of solid-state lighting (SSL) technology. The National Park Service (NPS) views this project as a possible proving ground and template for implementation of light-emitting diode (LED) luminaires in other NPS tunnels, thereby expanding the estimated 40% energy savings from 132 MWh/yr for this tunnel to a much larger figure national

  5. Executive summaries of reports leading to the construction of the Baca Geothermal Demonstration Project

    SciTech Connect

    Sherwood, P.B.; Newman, K.L.; Westermeier, J.F.; Giroux, H.D.; Lowe, G.D.; Nienberg, M.W.

    1980-05-01

    Executive summaries have been written for 61 reports and compilations of data which, in part, have led to the construction of the Baca 50 MW Geothermal Demonstration Project (GDP). The reports and data include environmental research, reservoir and feasibility studies, the project proposal to DOE and the Final Environmental Impact Statement. These executive summaries are intended to give the reader a general overview of each report prior to requesting the report from the GDP Data Manager.

  6. Executive summaries of reports leading to the construction of the Baca Geothermal Demonstration Project

    SciTech Connect

    Sherwood, P.B.; Newman, K.L.; Westermeier, J.F.; Giroux, H.D.; Lowe, G.D.; Nienberg, M.W.

    1980-05-01

    Executive summaries have been written for 61 reports and compilations of data which in part, have led to the construction of the Baca 50 MW Geothermal Demonstration Project (GDP). The reports and data include environmental research, reservoir and feasibility studies, the project proposal to DOE and the Final Environmental Impact Statement. These executive summaries are intended to give the reader a general overview of each report prior to requesting the report from the GDP Data Manager.

  7. Relationship of therapeutic recreation inpatient rehabilitation interventions and patient characteristics to outcomes following spinal cord injury: The SCIRehab project

    PubMed Central

    Cahow, Claire; Gassaway, Julie; Rider, Cecilia; Joyce, Joan P.; Bogenshutz, Andrew; Edens, Kelly; Kreider, Scott E. D.; Whiteneck, Gale

    2012-01-01

    Objective To investigate associations of therapeutic recreation (TR) interventions during inpatient rehabilitation for patients with traumatic spinal cord injury (SCI) with functional, participation, and quality of life outcomes. Methods In this prospective observational study, data were obtained from systematic recording of TR services by certified TR specialists, chart review, and patient interview. Results TR interventions, including exposure to community settings and leisure activities, add to the variance explained (in addition to the strong predictors of injury classification, admission motor Functional Independence Measure (FIM), and other patient characteristics) in outcomes at the time of rehabilitation discharge (FIM, discharge to home) and at the 1-year injury anniversary (FIM, working or being in school, residing at home, and societal participation as measured by the Craig Handicap Assessment and Reporting Technique (CHART)). They also are associated with less rehospitalization and less pressure development after discharge. In addition, more time spent in specific TR activities during rehabilitation is associated with more participation in the same type of activities at the 1-year injury anniversary. Conclusion(s) Greater participation in TR-led leisure skill and community activities during rehabilitation is a positive predictor of multiple outcomes at rehabilitation discharge and the 1-year injury anniversary demonstrating that TR activities are associated with a return to a productive and healthy life after SCI. Further research should focus on the impact of TR on longer-term outcomes to determine whether relationships continue or change as persons continue to adapt to their life after SCI. Note This is the fourth of nine articles in the SCIRehab series. PMID:23318036

  8. Rehabilitation robotics.

    PubMed

    Krebs, H I; Volpe, B T

    2013-01-01

    This chapter focuses on rehabilitation robotics which can be used to augment the clinician's toolbox in order to deliver meaningful restorative therapy for an aging population, as well as on advances in orthotics to augment an individual's functional abilities beyond neurorestoration potential. The interest in rehabilitation robotics and orthotics is increasing steadily with marked growth in the last 10 years. This growth is understandable in view of the increased demand for caregivers and rehabilitation services escalating apace with the graying of the population. We provide an overview on improving function in people with a weak limb due to a neurological disorder who cannot properly control it to interact with the environment (orthotics); we then focus on tools to assist the clinician in promoting rehabilitation of an individual so that s/he can interact with the environment unassisted (rehabilitation robotics). We present a few clinical results occurring immediately poststroke as well as during the chronic phase that demonstrate superior gains for the upper extremity when employing rehabilitation robotics instead of usual care. These include the landmark VA-ROBOTICS multisite, randomized clinical study which demonstrates clinical gains for chronic stroke that go beyond usual care at no additional cost.

  9. Rehabilitation robotics

    PubMed Central

    KREBS, H.I.; VOLPE, B.T.

    2015-01-01

    This chapter focuses on rehabilitation robotics which can be used to augment the clinician’s toolbox in order to deliver meaningful restorative therapy for an aging population, as well as on advances in orthotics to augment an individual’s functional abilities beyond neurorestoration potential. The interest in rehabilitation robotics and orthotics is increasing steadily with marked growth in the last 10 years. This growth is understandable in view of the increased demand for caregivers and rehabilitation services escalating apace with the graying of the population. We will provide an overview on improving function in people with a weak limb due to a neurological disorder who cannot properly control it to interact with the environment (orthotics); we will then focus on tools to assist the clinician in promoting rehabilitation of an individual so that s/he can interact with the environment unassisted (rehabilitation robotics). We will present a few clinical results occurring immediately poststroke as well as during the chronic phase that demonstrate superior gains for the upper extremity when employing rehabilitation robotics instead of usual care. These include the landmark VA-ROBOTICS multisite, randomized clinical study which demonstrates clinical gains for chronic stroke that go beyond usual care at no additional cost. PMID:23312648

  10. ULTRA-CLEAN FISCHER-TROPSCH FUELS PRODUCTION AND DEMONSTRATION PROJECT

    SciTech Connect

    Steve Bergin

    2004-10-18

    The Report Abstract provides summaries of the past year's activities relating to each of the main project objectives. Some of the objectives will be expanded on in greater detail further down in the report. The following objectives have their own addition sections in the report: SFP Construction and Fuel Production, Impact of SFP Fuel on Engine Performance, Fleet Testing at WMATA and Denali National Park, Demonstration of Clean Diesel Fuels in Diesel Electric Generators in Alaska, and Economic Analysis. ICRC provided overall project organization and budget management for the project. ICRC held meetings with various project participants. ICRC presented at the Department of Energy's annual project review meeting. The plant began producing fuel in October 2004. The first delivery of finished fuel was made in March of 2004 after the initial start-up period.

  11. A case management demonstration project for the frail elderly in Israel.

    PubMed

    Lowenstein, A

    2000-01-01

    This article presents an evaluation of an innovative community-based case management demonstration project for the frail elderly in Israel. The evaluation study was part of a nine-countries European project within the framework of the 1999 International Year of the Older People. The Department for the Aged of the Israeli Ministry of Labor and Social Affairs and the author initiated the project. The basis for the project development is described, including institutional structure, workers' qualifications, technical resources, and clients assessment criteria. The findings showed increased quality of life for the elders and their caregivers, more coordination and cooperation between various social and health services, activation of a variety of services, and client satisfaction. Recommendations are made to continue and expand this type of project to a larger segment of the elderly population.

  12. The demonstration projects: creating the capacity for nursing health human resource planning in Ontario's healthcare organizations.

    PubMed

    Burkoski, Vanessa; Tepper, Joshua

    2010-05-01

    Timely access to healthcare services requires the right number, mix and distribution of appropriately educated nurses, physicians and other healthcare professionals. In Ontario, as in several other jurisdictions, changing demographics, patterns of health service utilization and an aging workforce have created challenges related to the supply of nurses available now and in the future to deliver quality patient care. From 2006 to 2009, the Nursing Secretariat (NS) of Ontario's Ministry of Health and Long-Term Care (the ministry) undertook a progressive and comprehensive approach to address the issue of nursing supply across the province through the introduction of 17 Nursing Health Human Resources Demonstration Projects (demonstration projects). The demonstration projects initiative has led to the creation of a unique collection of best practices, tools and resources aimed at improving organizational planning capacity. Evaluation of the initiative generated recommendations that may guide the ministry toward policy and program development to foster improved nursing health human resource planning capacity in Ontario healthcare organizations.

  13. Los Alamos National Laboratory Tritium Technology Deployments Large Scale Demonstration and Deployment Project

    SciTech Connect

    McFee, J.; Blauvelt, D.; Stallings, E.; Willms, S.

    2002-02-26

    This paper describes the organization, planning and initial implementation of a DOE OST program to deploy proven, cost effective technologies into D&D programs throughout the complex. The primary intent is to accelerate closure of the projects thereby saving considerable funds and at the same time being protective of worker health and the environment. Most of the technologies in the ''toolkit'' for this program have been demonstrated at a DOE site as part of a Large Scale Demonstration and Deployment Project (LSDDP). The Mound Tritium D&D LSDDP served as the base program for the technologies being deployed in this project but other LSDDP demonstrated technologies or ready-for-use commercial technologies will also be considered. The project team will evaluate needs provided by site D&D project managers, match technologies against those needs and rank deployments using a criteria listing. After selecting deployments the project will purchase the equipment and provide a deployment engineer to facilitate the technology implementation. Other cost associated with the use of the technology will be borne by the site including operating staff, safety and health reviews etc. A cost and performance report will be prepared following the deployment to document the results.

  14. Large-scale decontamination and decommissioning technology demonstration project at a former uranium metal production facility

    SciTech Connect

    Martineit, R.A.; Borgman, T.D.; Peters, M.S.; Stebbins, L.L.

    1997-03-05

    The Department of Energy`s (DOE) Office of Science and Technology Decontamination and Decommissioning (D&D) Focus Area, led by the Federal Energy Technology Center, has been charged with improving upon baseline D&D technologies with the goal of demonstrating and validating more cost-effective and safer technologies to characterize, deactivate, survey, decontaminate, dismantle, and dispose of surplus structures, buildings, and their contents at DOE sites. The D&D Focus Area`s approach to verifying the benefits of the improved D&D technologies is to use them in large-scale technology demonstration (LSTD) projects at several DOE sites. The Fernald Environmental Management Project (FEMP) was selected to host one of the first three LSTD`s awarded by the D&D Focus Area. The FEMP is a DOE facility near Cincinnati, Ohio, that was formerly engaged in the production of high quality uranium metal. The FEMP is a Superfund site which has completed its RUFS process and is currently undergoing environmental restoration. With the FEMP`s selection to host an LSTD, the FEMP was immediately faced with some challenges. The primary challenge was that this LSTD was to be integrated into the FEMP`s Plant 1 D&D Project which was an ongoing D&D Project for which a firm fixed price contract had been issued to the D&D Contractor. Thus, interferences with the baseline D&D project could have significant financial implications. Other challenges include defining and selecting meaningful technology demonstrations, finding/selecting technology providers, and integrating the technology into the baseline D&D project. To date, twelve technologies have been selected, and six have been demonstrated. The technology demonstrations have yielded a high proportion of {open_quotes}winners.{close_quotes} All demonstrated, technologies will be evaluated for incorporation into the FEMP`s baseline D&D strategy.

  15. Rehabilitation News.

    ERIC Educational Resources Information Center

    International Journal of Rehabilitation Research, 1987

    1987-01-01

    Rehabilitation news items include, among others: a midpoint review of the implementation of the World Programme of Action Concerning Disabled Persons, an international study on the impact of new technologies on employment of disabled people, and a U.S. project to investigate disability service provision and innovations in other countries. (JDD)

  16. Biocrust re-establishment trials demonstrate beneficial prospects for mine site rehabilitation in semi-arid landscapes of Australia

    NASA Astrophysics Data System (ADS)

    Williams, Wendy; Williams, Stephen; Galea, Vic

    2015-04-01

    Biocrusts live at the interface between the atmosphere and the soil; powered by photosynthesis they strongly influence a range of soil micro-processes. At Jacinth-Ambrosia mine site, on the edge of the Nullarbor Plain (South Australia), biocrusts are a significant component of the semi-arid soil ecosystem and comprised mainly of cyanobacteria, lichens and mosses. Cyanobacteria directly contribute to soil surface stabilisation, regulation of soil moisture and, provide a biogeochemical pathway for carbon and nitrogen fertilisation. Following disturbance, rehabilitation processes are underpinned by early soil stabilisation that can be facilitated by physical crusts or bio-active crusts in which cyanobacteria are ideal soil surface colonisers. Biocrust growth trials were carried out in autumn and winter (2012) to test the re-establishment phases of highly disturbed topsoil associated with mine site operations. The substrate material originated from shallow calcareous sandy loam typically found in chenopod shrublands. The biocrust-rich substrates (1-5 cm) were crushed (biocrush) or fine sieved followed by an application of concentrated cyanobacterial inoculum. Each treatment comprised four replicated plots that were natural or moisture assisted (using subsurface mats). After initial saturation equal amounts of water were applied for 30 days at which time half of all of the plots were enclosed with plastic to increase humidity. From 30-60 days water was added as required and from 60-180 days all treatments were uncovered and subjected periodic wet-dry cycles. At 180 days diverse biocrusts had re-established across the majority of the treatments, incorporating a mix of cyanobacterial functional groups that were adapted to surface and subsurface habitats. There were no clear trends in diversity and abundance. Overall, the moisture assisted biocrush and sieved biocrush appeared to have 80% cyanobacterial diversity in common. Differences were found between the surface and

  17. Alaska low-rank coal-water fuel diesel demonstration project

    SciTech Connect

    Benson, C.; Wilson, R.; Walsh, D.; Ward, C.; Willson, W.

    1997-12-31

    A Coal-Water Fuel (CWF)-Diesel Demonstration Project developed by ADLittle (ADL) and Cooper-Energy Systems (CES) was selected for funding in US Dept. of Energy`s (DOE`s) Clean Coal Technology Program (CCT). The $38.3 million demonstration was originally planned for a utility in Maryland using CWF made from cleaned Ohio bituminous coal. When the host utility withdrew from the project, the sponsors sought a new location. During this time the technical feasibility of producing a premium low-rank coal-water fuel (LRCWF) from hydrothermally treated (HT) ultra-low S Alaskan subbituminous coal had been demonstrated at the pilot-scale. Since preliminary cost analyses showed Alaskan LRCWF to be competitive with Chinese bituminous CWF and oil priced at about $18 per barrel, an Alaskan consortium was seeking funding for a commercial-scale LRCWF demonstration project proposed for the University of Alaska Fairbanks (UAF). Since the engine developers at CES were already familiar with the features of LRCWF, the projects were combined and DOE approved relocating the LRCWF-Diesel CCT Project to UAF. The combined project will feature a 6.3 MWe diesel generation set with advanced emission controls capable of operating with either LRCWF or diesel, an oil-designed boiler also modified to use LRCWF or oil, and a nominal 120 tpd LRCWF production plant. Key project objectives are to develop commercial-scale LRCWF production costs, determine derating requirements and deratings for oil-designed boilers fired with LRCWF and to operate a LRCWF-fired diesel engine long enough to establish operating and wear characteristics.

  18. Hartwell Lake Project, Savannah River, Georgia and South Carolina. Rehabilitation of Clemson Upper Diversion Dam. Construction Foundation Report. Volume 2. Appendices B thru E

    DTIC Science & Technology

    1989-08-01

    N US Army Corps 0 of Engineers Savannah District HARTWELL LAKE PROJECT Savannah River, Georgia And South Carolina I REHABILITATION OF CLEMSON UPPER...ENGINEER DISTRICT, SAVANNAH CORPS OF ENGINEERS SAVANNAH, GEORGIA 89 12 l1 061 HARTWELL LAKE PROJECT SAVANNAH RIVER, GEORGIA AND SOUTH CAROLINA REHABILITATION...LOG South Atlantic Hartwell Lake oF 3 SHEETS ,. PROJECT 10. SIZE AN0 TYPE oF IT4 X5 1/2"dia bit 6"rock bit Clemson Upper Diversion Dam - 1. DATUM FO

  19. Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-71) - Duncan Creek Channel Rehabilitation Project

    SciTech Connect

    Stewart, Shannon C.

    2001-10-29

    BPA proposes to fund a project with the Washington State Department of Fish and Wildlife that will restore historic spawning areas for chum salmon in Duncan Creek. Duncan Creek, a Washington tributary of the Columbia River, was traditionally an important spawning area for chum salmon. The spring seeps areas that chum historically used for spawning are still present in Duncan Creek, however during the past 30 years they have been covered by sediment and debris and infested with reed canary grass. This project proposes to rehabilitate these spawning channels in order to provide chum salmon with a protected spawning and incubation environment. The proposed habitat rehabilitation project will include removing existing gravel in the seeps of Duncan Creek that contain mud, sand, and organics and replacing them with gravels that will maximize egg-to-fry survival rates for chum salmon. A trackhoe or similar equipment will be used to excavate the spawning sites. Invasive vegetation will be removed. Spawning channels will then be reconstructed using sediment free spawning gravels and base rock. Upon completion of work, all disturbed spring channel banks will be protected from erosion with staked coir fabric and revegetated with native willows. Plantings will help to restore native plant communities, increase stream channel shading, and reduce re-infestation by reed canary grass.

  20. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    SciTech Connect

    White, T.; Contos, L.; Adams, L. . Progress Center)

    1992-02-01

    The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

  1. Ultra-Clean Fischer-Tropsch Fuels Production and Demonstration Project

    SciTech Connect

    Steve Bergin

    2005-10-14

    The Report Abstract provides summaries of the past year's activities relating to each of the main project objectives. Some of the objectives will be expanded on in greater detail further down in the report. The following objectives have their own addition sections in the report: Dynamometer Durability Testing, the Denali Bus Fleet Demonstration, Bus Fleet Demonstrations Emissions Analysis, Impact of SFP Fuel on Engine Performance, Emissions Analysis, Feasibility Study of SFPs for Rural Alaska, and Cold Weather Testing of Ultra Clean Fuel.

  2. Research in Danish cancer rehabilitation: social characteristics and late effects of cancer among participants in the FOCARE research project.

    PubMed

    Høybye, Mette Terp; Dalton, Susanne Oksbjerg; Christensen, Jane; Larsen, Lone Ross; Kuhn, Katrin Gaardbo; Jensen, Jette Nygaard; Carlsen, Kathrine; Johansen, Christoffer

    2008-01-01

    Worldwide, the number of cancer survivors is increasing, owing to improvements in cancer therapy, resulting in an increased need to address the physical and mental sequelae of cancer. This paper introduces a Danish psychosocial cancer intervention and presents the baseline characteristics of the cancer survivors with respect to cancer site, sociodemographic variables, social network, lifestyle, self-rated health and the prevalence of cancer-related late effects. The study is part of the FOCARE research project, in which the long-term effects of the rehabilitation programme are evaluated systematically. The study is based on data from a self-administered baseline questionnaire filled in by 2 174 cancer survivors who registered for a 1-week, publicly paid rehabilitation retreat and were invited to participate in the FOCARE study in the period 25 November 2002 to 31 December 2005. The response rate at baseline was 86% (n = 1876). Most participants were younger women with breast cancer. They were generally well educated and working. The cancer survivors reported having comprehensive social networks and being physically active. Several cancer-related symptoms were reported by women with cancers at selected sites, of which fatigue was the most prevalent. More than half reported good-to-excellent self-rated health, while fair-to-poor health was reported by 40%, most of whom were survivors of lung (56%) and haematological (48%) cancers. The results indicate that Danish cancer survivors experience considerably reduced physical health, possibly as late physical effects of treatment. The problems reported by the cancer survivors suggest that cancer rehabilitation should include these aspects of living after cancer and take account of differences among cancer survivors with regard to cancer site, sex, age, family, working status and social position. These challenges might be addressed optimally in multi-dimensional rehabilitation programmes.

  3. The ACT{sup 2} project: Demonstration of maximum energy efficiency in real buildings

    SciTech Connect

    Crawley, D.B.; Krieg, B.L.

    1991-11-01

    A large US utility recently began a project to determine whether the use of new energy-efficient end-use technologies and systems would economically achieve substantial energy savings (perhaps as high as 75% over current practice). Using a field-based demonstration approach, the Advanced Customer Technology Test (ACT{sup 2}) for Maximum Energy Efficiency is providing information on the maximum energy savings possible when integrated packages of new high-efficiency end-use technologies are incorporated into commercial and residential buildings and industrial and agricultural processes. This paper details the underlying rationale, approach, results to date, and future plans for ACT{sup 2}. The ultimate goal is energy efficiency (doing more with less energy) rather than energy conservation (freezing in the dark). In this paper, we first explain why a major United States utility is committed to pursuing demand-side management so aggressively. Next, we discuss the approach the utility chose for conducting the ACT{sup 2} project. We then review results obtained to date from the project`s pilot demonstration site. Last, we describe other related demonstration projects being proposed by the utility.

  4. Low-head hydroelectric power demonstration project: City of Gonzales, Texas

    NASA Astrophysics Data System (ADS)

    1985-01-01

    This report summarizes the project construction which began in the second quarter of 1980 with the dismantling of the existing turbines, and was completed in the last quarter of 1983. The existing power plant structure and dam are located at Gonzales, Texas on the Guadalupe River. The powerhouse was built in 1925. The ungated dam produces a net head of about 14 feet. The power plant consists of three bays that originally housed three vertical open flume units. Power was transmitted from each turbine runner by a vertical shaft to a generator located some 20 feet above the crest of the dam and above normal river flood levels. The plant went into operation soon after 1925. Each unit had a nominal output of about 370 kW. In 1965, the generator, governors, and electrical equipment were removed from the powerhouse. The turbines were left in place. The dam and powerhouse were in fairly good condition, requiring only minimal restoration. However, bank protection on the left abutment and erosion control improvements on the right abutment were necessary. Disassembly and inspection of the old turbines showed them to be in good condition, and the decision was made to rehabilitate them. .DLN : Killed, Superseded by N85-35233

  5. Milliken Clean Coal Technology Demonstration Project. Environmental monitoring report, July--September 1996

    SciTech Connect

    1998-05-01

    New York State Electric and Gas Corporation (NYSEG) has installed and is presently operating a high-efficiency flue gas desulfurization (FGD) system to demonstrate innovative emissions control technology and comply with the Clean Air Act Amendments of 1990. The host facility for this demonstration project is NYSEG`s Milliken Station, in the Town of Lansing, New York. The primary objective of this project is to demonstrate a retrofit of energy-efficient SO{sub 2} and NO{sub x} control systems with minimal impact on overall plant efficiency. The demonstration project has added a forced oxidation, formic acid-enhanced wet limestone FGD system, which is expected to reduce SO{sub 2} emissions by at least 90 percent. NYSEG also made combustion modifications to each boiler and plans to demonstrate selective non-catalytic reduction (SNCR) technology on unit 1, which will reduce NO{sub x} emissions. Goals of the proposed demonstration include up to 98 percent SO{sub 2} removal efficiency while burning high-sulfur coal, 30 percent NO{sub x} reductions through combustion modifications, additional NO{sub x} reductions using SNCR technology, production of marketable commercial-grade gypsum and calcium chloride by-products to minimize solid waste disposal, and zero wastewater discharge.

  6. Advanced Coal Conversion Process Demonstration Project. Technical progress report, January 1, 1995--March 31, 1995

    SciTech Connect

    1996-06-01

    This detailed report describes the technical progress made on the Advanced Coal Conversion Process (ACCP) Demonstration Project. This U.S. Department of Energy (DOE) Clean Coal Technology Project demonstrates an advanced thermal coal upgrading process, coupled with physical cleaning techniques, that is designed to upgrade high-moisture, low-rank coals to high-quality, low-sulfur fuel. During this reporting period, the primary focus for the project was to expand market awareness and acceptability for the products and the technology. The use of covered hopper cars has been successful and marketing efforts have focused on this technique. Operational improvements are currently aimed at developing fines marketing systems, increasing throughput capacity, decreasing operation costs, and developing standardized continuous operator training. Testburns at industrial user sites were also conducted. A detailed process description; technical progress report including facility operations/plant production, facility testing, product testing, and testburn product; and process stability report are included. 3 figs., 8 tabs.

  7. Water Use Optimization Toolset Project: Development and Demonstration Phase Draft Report

    SciTech Connect

    Gasper, John R.; Veselka, Thomas D.; Mahalik, Matthew R.; Hayse, John W.; Saha, Samrat; Wigmosta, Mark S.; Voisin, Nathalie; Rakowski, Cynthia; Coleman, Andre; Lowry, Thomas S.

    2014-05-19

    This report summarizes the results of the development and demonstration phase of the Water Use Optimization Toolset (WUOT) project. It identifies the objective and goals that guided the project, as well as demonstrating potential benefits that could be obtained by applying the WUOT in different geo-hydrologic systems across the United States. A major challenge facing conventional hydropower plants is to operate more efficiently while dealing with an increasingly uncertain water-constrained environment and complex electricity markets. The goal of this 3-year WUOT project, which is funded by the U.S. Department of Energy (DOE), is to improve water management, resulting in more energy, revenues, and grid services from available water, and to enhance environmental benefits from improved hydropower operations and planning while maintaining institutional water delivery requirements. The long-term goal is for the WUOT to be used by environmental analysts and deployed by hydropower schedulers and operators to assist in market, dispatch, and operational decisions.

  8. Environmental Assessment for the Warren Station externally fired combined cycle demonstration project

    SciTech Connect

    1995-04-01

    The proposed Penelec project is one of 5 projects for potential funding under the fifth solicitation under the Clean Coal Technology program. In Penelec, two existing boilers would be replaced at Warren Station, PA; the new unit would produce 73 MW(e) in a combined cycle mode (using both gas-fired and steam turbines). The project would fill the need for a full utility-size demonstration of externally fire combined cycle (EFCC) technology as the next step toward commercialization. This environmental assessment was prepared for compliance with NEPA; its purpose is to provide sufficient basis for determining whether to prepare an environmental impact statement or to issue a finding of no significant impact. It is divided into the sections: purpose and need for proposed action; alternatives; brief description of affected environment; environmental consequences, including discussion of commercial operation beyond the demonstration period.

  9. The development of the human exploration demonstration project (HEDP), a planetary systems testbed

    NASA Technical Reports Server (NTRS)

    Chevers, Edward S.; Korsmeyer, David J.

    1993-01-01

    The Human Exploration Demonstration Project (HEDP) is an ongoing task at the National Aeronautics and Space Administration's Ames Research Center to address the advanced technology requirements necessary to implement an integrated working and living environment for a planetary surface habitat. The integrated environment will consist of life support systems, physiological monitoring of project crew, a virtual environment workstation, and centralized data acquisition and habitat systems health monitoring. There will be several robotic systems on a simulated planetary landscape external to the habitat environment to provide representative work loads for the crew. This paper describes the status of the HEDP after one year, the major facilities composing the HEDP, the project's role as an Ames Research Center testbed, and the types of demonstration scenarios that will be run to showcase the technologies.

  10. ESL Workplace Literacy Curriculum for a JTPA/Family English Literacy Demonstration Project.

    ERIC Educational Resources Information Center

    Saumweber, Judy; And Others

    A JTPA/FEL (Job Training Partnership Act/Family English Literacy) demonstration project is reported that involves a partnership between the Lao Family Community (LFC) of Minnesota, the City of St. Paul, and St. Paul Public Schools/Adult Basic Education. The goal is to provide workplace literacy instruction to refugees with limited English…

  11. 75 FR 77379 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ... Laboratory (NRL), Aviation Missile Research, Development and Engineering Center (AMRDEC), Medical Research... Demonstration Project, Department of Navy, Office of Naval Research; Notice #0;#0;Federal Register / Vol. 75... Navy, Office of Naval Research AGENCY: Office of the Deputy Under Secretary of Defense...

  12. The Outreach Sourcebook, Volume 7: Rural Health Demonstration Projects, 1997 to 2000.

    ERIC Educational Resources Information Center

    Health Resources and Services Administration (DHHS), Rockville, MD. Office of Rural Health Policy.

    In 1997, the federal Office of Rural Health Policy awarded 3-year outreach demonstration grants to 45 projects to provide direct primary and preventive health care services to rural residents in 28 states. The grant program allows recipients to test innovative ideas against the challenges of rural health care delivery, such as provider shortages,…

  13. The Outreach Sourcebook, Volume 6: Rural Health Demonstration Projects, 1996 to 1999.

    ERIC Educational Resources Information Center

    Health Resources and Services Administration (DHHS), Rockville, MD. Office of Rural Health Policy.

    In 1996, the federal Office of Rural Health Policy awarded 3-year outreach demonstration grants to 25 projects to provide direct primary and preventive health care services to rural residents in 20 states. The grant program allows recipients to test innovative ideas against the challenges of rural health care delivery, such as provider shortages,…

  14. A PLANNED COMMUNITY FOR MIGRATORY FARM WORKERS--A PROPOSAL FOR A DEMONSTRATION PROJECT.

    ERIC Educational Resources Information Center

    PEERY, A.B.

    A DEMONSTRATION PROJECT FOR MIGRATORY FARM LABORERS HOME-BASED IN SOUTH TEXAS IS PROPOSED. THE PURPOSE IS TO DESIGN A PLANNED COMMUNITY CONTAINING HOUSING, HEALTH FACILITIES, ORIENTATION AND EDUCATIONAL FACILITIES, JOB-PLACEMENT FACILITIES, AND SOCIAL, RECREATIONAL, AND COMMERCIAL FACILITIES. THE PLANNED COMMUNITY WOULD PROVIDE SAFE, SANITARY, AND…

  15. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2007-09-27

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

  16. West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2006-09-21

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

  17. Two Decades of JDAI: From Demonstration Project to National Standard. A Progress Report

    ERIC Educational Resources Information Center

    Mendel, Richard

    2009-01-01

    Launched in the 1990s by the Annie E. Casey Foundation as a five-site demonstration project, the Juvenile Detention Alternatives Initiative (JDAI) has steadily swept the country in recent years and is on track to become the standard of practice for how local justice systems nationwide handle the critical front end of the juvenile court process.…

  18. 20 CFR 641.610 - How are pilot, demonstration, and evaluation projects administered?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false How are pilot, demonstration, and evaluation projects administered? 641.610 Section 641.610 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROVISIONS GOVERNING THE SENIOR COMMUNITY SERVICE EMPLOYMENT PROGRAM Pilot,...

  19. 20 CFR 641.610 - How are pilot, demonstration, and evaluation projects administered?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false How are pilot, demonstration, and evaluation projects administered? 641.610 Section 641.610 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROVISIONS GOVERNING THE SENIOR COMMUNITY SERVICE EMPLOYMENT PROGRAM Pilot,...

  20. A Guide to Special Demonstration and Teacher Education Projects: Special Answers for Special Needs.

    ERIC Educational Resources Information Center

    Office of Vocational and Adult Education (ED), Washington, DC. Div. of Adult Education and Literacy.

    Intended to share information about specialized training and demonstration activities from a rich diversity of local subject interests, environments, and populations served, this guide is a compilation of adult education and literacy resources funded under the Adult Education Act. Information is provided on 276 projects funded under Section 353 of…

  1. UPDATE ON THE ROUND ONE AND ROUND TWO USEPA ARSENIC REMOVAL TECHNOLOGY DEMONSTRATION PROJECTS

    EPA Science Inventory

    This presentation provides a status report on the Arsenic Treatment Technology Demonstration Program. The information includes the status of the projects on both round 1 and round 2 including some photos of the treatment systems. Limited information is given on the results of t...

  2. 20 CFR 404.1717 - Demonstration project on direct payment of fees to non-attorneys.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... fees to non-attorneys. 404.1717 Section 404.1717 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL OLD-AGE, SURVIVORS AND DISABILITY INSURANCE (1950- ) Representation of Parties § 404.1717 Demonstration project on direct payment of fees to non-attorneys. (a) Section 303 of the Social...

  3. 20 CFR 416.1517 - Demonstration project on direct payment of fees to non-attorneys.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... fees to non-attorneys. 416.1517 Section 416.1517 Employees' Benefits SOCIAL SECURITY ADMINISTRATION SUPPLEMENTAL SECURITY INCOME FOR THE AGED, BLIND, AND DISABLED Representation of Parties § 416.1517 Demonstration project on direct payment of fees to non-attorneys. (a) Section 303 of the Social...

  4. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    SciTech Connect

    West Valley Environmental Services LLC and URS - Washington Division

    2008-12-17

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

  5. Experiential Education in Boston's Pilot Schools: A Three-Year Demonstration Project. PSEED Documentation Report

    ERIC Educational Resources Information Center

    Miller, Beth M.; Tung, Rosann; Ward, Rolanda

    2008-01-01

    The Pilot schools Experiential Education Demonstration (PSEED) project was intended to deepen and embed high-quality experiential education within each participating school's academic programs. A continuation of a multiyear set of initiatives by the Barr Foundation, PSEED was an effort to unify the foundation's content area foci on arts,…

  6. Reaching Out to Older Veterans in Need: The Elko Clinic Demonstration Project

    ERIC Educational Resources Information Center

    Juretic, Meghan; Hill, Robert; Luptak, Marilyn; Rupper, Randall; Bair, Byron; Floyd, James; Westfield, Brian; Dailey, Nancy K.

    2010-01-01

    Context: The challenge of providing meaningful health care services to veterans living in rural communities is a major public health concern that involves redefining the traditional facility-based model of care delivery employed in urban areas. Purpose: This paper describes the steps of a demonstration project, the Elko Telehealth Outreach Clinic.…

  7. Characteristics of Young Children Exposed to Violence: The Safe Start Demonstration Project

    ERIC Educational Resources Information Center

    Kaufman, Joy S.; Ortega, Sandra; Schewe, Paul A.; Kracke, Kristen

    2011-01-01

    The Safe Start demonstration projects, funded by the Office of Juvenile Justice and Delinquency Prevention (OJJDP) under the first phase of the Safe Start initiative, are primarily designed to influence change at the systems or macrolevels to reduce the incidence of and impact of exposure to violence for children aged birth to 6 years; direct…

  8. Public Service Jobs and Transitional Employment: An Analysis of the Vermont Experimental and Demonstration Project.

    ERIC Educational Resources Information Center

    Craft, James A.

    The three year Vermont Experimental and Demonstration Project, sponsored by Manpower Administration, was designed to provide basic empirical data on the feasibility and usefulness of public service employment as a manpower tool to provide transitional employment opportunities for low income unemployed and welfare recipients. Data was collected on…

  9. Summary of the evidence file demonstrating completion of the NIF Project Completion Criteria

    SciTech Connect

    Haynam, C. A.

    2014-12-04

    This document summarizes the results of performance verification tests on NIF that demonstrate it has met its performance-related Project Completion Criteria (PCC). It includes measurements made on NIF with the NIF diagnostics, the calibration of these diagnostics and the supporting analyses that verify the NIF performance criteria have been met.

  10. 78 FR 67182 - Announcement of Funding Awards for the Section 811 Project Rental Assistance Demonstration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ...In accordance with section 102 (a)(4)(C) of the Department of Housing and Urban Development Reform Act of 1989, this announcement notifies the public of funding decisions made by the Department in a competition for funding under the Notice of Funding Availability (NOFA) for the Section 811 Project Rental Assistance Demonstration Program. This announcement contains the names of the awardees and......

  11. 76 FR 8529 - Science and Technology Reinvention Laboratory (STRL) Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-14

    ...: Office of the Deputy Under Secretary of Defense (Civilian Personnel Policy), (DUSD (CPP)), DoD. ACTION... demonstration projects to determine whether a specified change in personnel management policies or procedures... improvements in civilian personnel policy, organization, and management. Pursuant to the authority provided...

  12. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    SciTech Connect

    White, T.; Contos, L.

    1991-09-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. These data were collected by implementing the Environmental Monitoring Plan (EMP) for the DOE LIMB Demonstration Project Extension, dated August 1988. This document is the fifth EMP status report to be published and presents the data generated during November and December 1990, and January 1991. These reports review a three or four month period and have been published since the project's start in October 1989. The DOE project is an extension of the US Environmental Protection Agency's (EPA) original LIMB Demonstration. The program is operated under DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs). 5 figs., 12 tabs.

  13. Outward Bound and Confluent Education: A Demonstration Project Accentuating Affective Learning.

    ERIC Educational Resources Information Center

    Nadler, Reldan S.

    In 1976 a demonstration project at the Connecticut Wilderness School integrated a Confluent Education curriculum in Outward Bound type courses, to facilitate affective learning for a more meaningful and relevant experience. A review of Outward Bound literature identified the need for affective learning as a significant program constituent. Five…

  14. 78 FR 73559 - Renewal of Agency Information Collection for Reporting Systems for Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-06

    ... of 1992 (as amended) Demonstration Project authorized by OMB Control Number 1076-0135. This... collection conducted under OMB Control Number 1076-0135, Reporting System for Indian Employment, Training... public review, we cannot guarantee that we will be able to do so. III. Data OMB Control Number:...

  15. 78 FR 32637 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-31

    ... during the annual review process.'' B. Employee Notification Demonstration project policies and... Biological Center (ECBC) AGENCY: Office of the Deputy Under Secretary of Defense (Civilian Personnel Policy... Defense Authorization Act (NDAA) for Fiscal Year (FY) 1995, as amended by section 1109 of NDAA FY 2000...

  16. 20 CFR 404.1629 - Participation in research and demonstration projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Participation in research and demonstration projects. 404.1629 Section 404.1629 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL OLD-AGE, SURVIVORS AND DISABILITY INSURANCE (1950- ) Determinations of Disability Administrative Responsibilities...

  17. 76 FR 12507 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-07

    ... discipline'' mean? Is this the ``Control Gates'' or ``Swim Lanes'' as TARDEC currently calls it under... funding levels. The use of ``control gates'' for the demonstration project, if used, will be contained in..., through GS-11, step 10. TARDEC has Chemists whose full performance grade (GS-9/11) falls in this band....

  18. Building a Partnership to Evaluate School-Linked Health Services: The Cincinnati School Health Demonstration Project

    ERIC Educational Resources Information Center

    Rose, Barbara L.; Mansour, Mona; Kohake, Kelli

    2005-01-01

    The Cincinnati School Health Demonstration Project was a 3-year collaboration that evaluated school-linked health services in 6 urban elementary (kindergarten to eighth grade) schools. Partners from the Cincinnati Health Department, Cincinnati Public Schools, Cincinnati Children's Hospital Medical Center, and The Health Foundation of Greater…

  19. 75 FR 27865 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... * * * ``can help managers to operate with more authority, responsibility, and skill to increase work force and... the SDE. 5. Skill Codes The AF presently uses skill code sets within the Defense Civilian Personnel... personnel into, out of, and within the Demonstration Project, the AF system of skills coding continues to...

  20. Design of equipment used for high-level waste vitrification at the West Valley Demonstration Project

    SciTech Connect

    Vance, R.F.; Brill, B.A.; Carl, D.E.

    1997-06-01

    The equipment as designed, started, and operated for high-level radioactive waste vitrification at the West Valley Demonstration Project in western New York State is described. Equipment for the processes of melter feed make-up, vitrification, canister handling, and off-gas treatment are included. For each item of equipment the functional requirements, process description, and hardware descriptions are presented.

  1. Final Evaluation and Monitoring Report of Demonstration Project for Adult Education "Mobilizing Adult Basic Education".

    ERIC Educational Resources Information Center

    Harris, Dolores M.

    A demonstration adult education project aimed at a rural New Jersey population and involving class sessions 1 evening per week at 6 sites (N=85 students, including 65 caucasians, 10 blacks, and 10 Hispanic) was evaluated in terms of compliance, process, and performance. Compliance monitoring included examination of: visitations; budget; staff…

  2. 20 CFR 670.560 - Is Job Corps authorized to conduct pilot and demonstration projects?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 4 2012-04-01 2012-04-01 false Is Job Corps authorized to conduct pilot and demonstration projects? 670.560 Section 670.560 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) THE JOB CORPS UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Program Activities and Center Operations §...

  3. 20 CFR 670.560 - Is Job Corps authorized to conduct pilot and demonstration projects?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Is Job Corps authorized to conduct pilot and demonstration projects? 670.560 Section 670.560 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR THE JOB CORPS UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Program Activities and Center Operations § 670.560 Is...

  4. 20 CFR 670.560 - Is Job Corps authorized to conduct pilot and demonstration projects?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 4 2014-04-01 2014-04-01 false Is Job Corps authorized to conduct pilot and demonstration projects? 670.560 Section 670.560 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) THE JOB CORPS UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Program Activities and Center Operations §...

  5. Research and Demonstration Projects: Programs for Gifted, January 1990-1991.

    ERIC Educational Resources Information Center

    Ohio State Dept. of Education, Columbus. Div. of Special Education.

    Thirteen research and demonstration projects developed by Ohio school districts for the education of gifted students are described. The programs involve inservice teacher education; interdepartmental teamwork; collaboration with community and university resources; a continuum of services for gifted children in regular classrooms; learning options…

  6. 77 FR 40601 - Final Priority: Disability and Rehabilitation Research Projects and Centers Program; Disability...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... and Rehabilitative Services, Department of Education. ACTION: Notice. Overview Information CFDA Number... later years. We take this action to focus research attention on areas of national need. DATES: Effective.... Exploration means the stage of research that generates hypotheses or theories by conducting new and...

  7. 77 FR 37012 - Applications for New Awards: Disability and Rehabilitation Research Projects and Centers Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ..., including international activities, to develop methods, procedures, and rehabilitation technology that... 8.5'' x 11'', on one side only, with 1'' margins at the top, bottom, and both sides. Double space... application is not evaluated or not selected for funding, we notify you. 2. Administrative and National...

  8. Training Needs for Substance Abuse Treatment and Assessment among Rehabilitation Counselors: California State Project

    ERIC Educational Resources Information Center

    Ong, Lee Za; Lee, Dal-Yob; Cha, Grace; Arokiasamy, Charles

    2008-01-01

    One hundred rehabilitation counselors in California reported that about 90% of consumers with whom they worked with had substance abuse and cooccurring issues, yet about half rated their graduate training in substance abuse treatment and assessment as poor and their practices as marginally proficient. The correlation analysis revealed that…

  9. Advanced Grid-Friendly Controls Demonstration Project for Utility-Scale PV Power Plants

    SciTech Connect

    Gevorgian, Vahan; O'Neill, Barbara

    2016-01-21

    A typical photovoltaic (PV) power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. The availability and dissemination of actual test data showing the viability of advanced utility-scale PV controls among all industry stakeholders can leverage PV's value from being simply an energy resource to providing additional ancillary services that range from variability smoothing and frequency regulation to power quality. Strategically partnering with a selected utility and/or PV power plant operator is a key condition for a successful demonstration project. The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office selected the National Renewable Energy Laboratory (NREL) to be a principal investigator in a two-year project with goals to (1) identify a potential partner(s), (2) develop a detailed scope of work and test plan for a field project to demonstrate the gird-friendly capabilities of utility-scale PV power plants, (3) facilitate conducting actual demonstration tests, and (4) disseminate test results among industry stakeholders via a joint NREL/DOE publication and participation in relevant technical conferences. The project implementation took place in FY 2014 and FY 2015. In FY14, NREL established collaborations with AES and First Solar Electric, LLC, to conduct demonstration testing on their utility-scale PV power plants in Puerto Rico and Texas, respectively, and developed test plans for each partner. Both Puerto Rico Electric Power Authority and the Electric Reliability Council of Texas expressed interest in this project because of the importance of such advanced controls for the reliable operation of their power systems under high penetration levels of variable renewable generation. During FY15, testing was completed on both plants, and a large amount of test data was produced and analyzed that demonstrates the ability of PV power plants to

  10. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    SciTech Connect

    West Valley Environmental Services LLC and URS Corporation

    2010-09-17

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  11. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    SciTech Connect

    None, None

    2011-09-28

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  12. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Klenk, David P.

    2013-09-19

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  13. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011

    SciTech Connect

    none,

    2012-09-27

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  14. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.; Biedermann, Charles A.; Steiner, II, Robert E.; Fox, James R.; Hoch, Jerald J.; Wrotniak, Chester M.; Werchowski, Rebecca L.

    2016-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  15. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    SciTech Connect

    White, T.; Contos, L.; Adams, L. )

    1992-03-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency's (EPA's) original LIMB Demonstration. The program is operated nuclear DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

  16. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.

    2014-09-16

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  17. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.; Biedermann, Charles A.; Steiner, II, Robert E.; Fox, James R.; Hoch, Jerald J.; Werchowski, Rebecca L.

    2015-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  18. Electric Ground Support Equipment Advanced Battery Technology Demonstration Project at the Ontario Airport

    SciTech Connect

    Tyler Gray; Jeremy Diez; Jeffrey Wishart; James Francfort

    2013-07-01

    The intent of the electric Ground Support Equipment (eGSE) demonstration is to evaluate the day-to-day vehicle performance of electric baggage tractors using two advanced battery technologies to demonstrate possible replacements for the flooded lead-acid (FLA) batteries utilized throughout the industry. These advanced battery technologies have the potential to resolve barriers to the widespread adoption of eGSE deployment. Validation testing had not previously been performed within fleet operations to determine if the performance of current advanced batteries is sufficient to withstand the duty cycle of electric baggage tractors. This report summarizes the work performed and data accumulated during this demonstration in an effort to validate the capabilities of advanced battery technologies. This report summarizes the work performed and data accumulated during this demonstration in an effort to validate the capabilities of advanced battery technologies. The demonstration project also grew the relationship with Southwest Airlines (SWA), our demonstration partner at Ontario International Airport (ONT), located in Ontario, California. The results of this study have encouraged a proposal for a future demonstration project with SWA.

  19. The Effectiveness of Online Instructional Videos in the Acquisition and Demonstration of Cognitive, Affective and Psychomotor Rehabilitation Skills

    ERIC Educational Resources Information Center

    Cooper, Darren; Higgins, Steve

    2015-01-01

    The use of instructional videos to teach clinical skills is an ever growing area of e-learning based upon observational learning that is cited as one of the most basic yet powerful learning strategies. The aim of the current study is to evaluate the effectiveness of online instructional videos for the acquisition and demonstration of cognitive,…

  20. The Sydney 2000 World Weather Research Programme Forecast Demonstration Project: Overview and Current Status.

    NASA Astrophysics Data System (ADS)

    Keenan, T.; Joe, P.; Wilson, J.; Collier, C.; Golding, B.; Burgess, D.; May, P.; Pierce, C.; Bally, J.; Crook, A.; Seed, A.; Sills, D.; Berry, L.; Potts, R.; Bell, I.; Fox, N.; Ebert, E.; Eilts, M.;  O'Loughlin, K.;  Webb, R.;  Carbone, R.;  Browning, K.;  Roberts, R.;  Mueller, C.

    2003-08-01

    The first World Weather Research Programme (WWRP) Forecast Demonstration Project (FDP), with a focus on nowcasting, was conducted in Sydney, Australia, from 4 September to 21 November 2000 during a period associated with the Sydney 2000 Olympic Games. Through international collaboration, nine nowcasting systems from the United States, United Kingdom, Canada, and Australia were deployed at the Sydney Office of the Bureau of Meteorology (BOM) to demonstrate the capability of modern forecast systems and to quantify the associated benefits in the delivery of a real-time nowcast service. On-going verification and impact studies supported by international committees assisted by the WWRP formed an integral part of this project. A description is given of the project, including component systems, the weather, and initial outcomes. Initial results show that the nowcasting systems tested were transferable and able to provide valuable information enhancing BOM nowcasts. The project provided for unprecedented interchange of concepts and ideas between forecasters, researchers, and end users in an operational framework where they all faced common issues relevant to real time nowcast decision making. A training workshop sponsored by the World Meteorological Organization (WMO) was also held in conjunction with the project so that other member nations could benefit from the FDP.