Implementing a Reliability Centered Maintenance Program at NASA's Kennedy Space Center
NASA Technical Reports Server (NTRS)
Tuttle, Raymond E.; Pete, Robert R.
1998-01-01
Maintenance practices have long focused on time based "preventive maintenance" techniques. Components were changed out and parts replaced based on how long they had been in place instead of what condition they were in. A reliability centered maintenance (RCM) program seeks to offer equal or greater reliability at decreased cost by insuring only applicable, effective maintenance is performed and by in large part replacing time based maintenance with condition based maintenance. A significant portion of this program involved introducing non-intrusive technologies, such as vibration analysis, oil analysis and I/R cameras, to an existing labor force and management team.
Beyond reliability to profitability
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bond, T.H.; Mitchell, J.S.
1996-07-01
Reliability concerns have controlled much of power generation design and operations. Emerging from a strictly regulated environment, profitability is becoming a much more important concept for today`s power generation executives. This paper discusses the conceptual advance-view power plant maintenance as a profit center, go beyond reliability, and embrace profitability. Profit Centered Maintenance begins with the premise that financial considerations, namely profitability, drive most aspects of modern process and manufacturing operations. Profit Centered Maintenance is a continuous process of reliability and administrative improvement and optimization. For the power generation executives with troublesome maintenance programs, Profit Centered Maintenance can be the blueprintmore » to increased profitability. It requires the culture change to make decisions based on value, to reengineer the administration of maintenance, and to enable the people performing and administering maintenance to make the most of available maintenance information technology. The key steps are to optimize the physical function of maintenance and to resolve recurring maintenance problems so that the need for maintenance can be reduced. Profit Centered Maintenance is more than just an attitude it is a path to profitability, be it resulting in increased profits or increased market share.« less
Reliability Centered Maintenance - Methodologies
NASA Technical Reports Server (NTRS)
Kammerer, Catherine C.
2009-01-01
Journal article about Reliability Centered Maintenance (RCM) methodologies used by United Space Alliance, LLC (USA) in support of the Space Shuttle Program at Kennedy Space Center. The USA Reliability Centered Maintenance program differs from traditional RCM programs because various methodologies are utilized to take advantage of their respective strengths for each application. Based on operational experience, USA has customized the traditional RCM methodology into a streamlined lean logic path and has implemented the use of statistical tools to drive the process. USA RCM has integrated many of the L6S tools into both RCM methodologies. The tools utilized in the Measure, Analyze, and Improve phases of a Lean Six Sigma project lend themselves to application in the RCM process. All USA RCM methodologies meet the requirements defined in SAE JA 1011, Evaluation Criteria for Reliability-Centered Maintenance (RCM) Processes. The proposed article explores these methodologies.
DOT National Transportation Integrated Search
2010-12-01
The purpose of this qualitative case study was to identify the types of obstacles and patterns experienced by a single heavy rail transit agency located in North America that embedded a Reliability Centered Maintenance (RCM) Process. The outcome of t...
Application of reliability-centered-maintenance to BWR ECCS motor operator valve performance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Feltus, M.A.; Choi, Y.A.
1993-01-01
This paper describes the application of reliability-centered maintenance (RCM) methods to plant probabilistic risk assessment (PRA) and safety analyses for four boiling water reactor emergency core cooling systems (ECCSs): (1) high-pressure coolant injection (HPCI); (2) reactor core isolation cooling (RCIC); (3) residual heat removal (RHR); and (4) core spray systems. Reliability-centered maintenance is a system function-based technique for improving a preventive maintenance program that is applied on a component basis. Those components that truly affect plant function are identified, and maintenance tasks are focused on preventing their failures. The RCM evaluation establishes the relevant criteria that preserve system function somore » that an RCM-focused approach can be flexible and dynamic.« less
Using Facility Condition Assessments to Identify Actions Related to Infrastructure
NASA Technical Reports Server (NTRS)
Rubert, Kennedy F.
2010-01-01
To support cost effective, quality research it is essential that laboratory and testing facilities are maintained in a continuous and reliable state of availability at all times. NASA Langley Research Center (LaRC) and its maintenance contractor, Jacobs Technology, Inc. Research Operations, Maintenance, and Engineering (ROME) group, are in the process of implementing a combined Facility Condition Assessment (FCA) and Reliability Centered Maintenance (RCM) program to improve asset management and overall reliability of testing equipment in facilities such as wind tunnels. Specific areas are being identified for improvement, the deferred maintenance cost is being estimated, and priority is being assigned against facilities where conditions have been allowed to deteriorate. This assessment serves to assist in determining where to commit available funds on the Center. RCM methodologies are being reviewed and enhanced to assure that appropriate preventive, predictive, and facilities/equipment acceptance techniques are incorporated to prolong lifecycle availability and assure reliability at minimum cost. The results from the program have been favorable, better enabling LaRC to manage assets prudently.
NASA Astrophysics Data System (ADS)
Witantyo; Rindiyah, Anita
2018-03-01
According to data from maintenance planning and control, it was obtained that highest inventory value is non-routine components. Maintenance components are components which procured based on maintenance activities. The problem happens because there is no synchronization between maintenance activities and the components required. Reliability Centered Maintenance method is used to overcome the problem by reevaluating maintenance activities required components. The case chosen is roller mill system because it has the highest unscheduled downtime record. Components required for each maintenance activities will be determined by its failure distribution, so the number of components needed could be predicted. Moreover, those components will be reclassified from routine component to be non-routine component, so the procurement could be carried out regularly. Based on the conducted analysis, failure happens in almost every maintenance task are classified to become scheduled on condition task, scheduled discard task, schedule restoration task and no schedule maintenance. From 87 used components for maintenance activities are evaluated and there 19 components that experience reclassification from non-routine components to routine components. Then the reliability and need of those components were calculated for one-year operation period. Based on this invention, it is suggested to change all of the components in overhaul activity to increase the reliability of roller mill system. Besides, the inventory system should follow maintenance schedule and the number of required components in maintenance activity so the value of procurement will be decreased and the reliability system will increase.
Quantified Risk Ranking Model for Condition-Based Risk and Reliability Centered Maintenance
NASA Astrophysics Data System (ADS)
Chattopadhyaya, Pradip Kumar; Basu, Sushil Kumar; Majumdar, Manik Chandra
2017-06-01
In the recent past, risk and reliability centered maintenance (RRCM) framework is introduced with a shift in the methodological focus from reliability and probabilities (expected values) to reliability, uncertainty and risk. In this paper authors explain a novel methodology for risk quantification and ranking the critical items for prioritizing the maintenance actions on the basis of condition-based risk and reliability centered maintenance (CBRRCM). The critical items are identified through criticality analysis of RPN values of items of a system and the maintenance significant precipitating factors (MSPF) of items are evaluated. The criticality of risk is assessed using three risk coefficients. The likelihood risk coefficient treats the probability as a fuzzy number. The abstract risk coefficient deduces risk influenced by uncertainty, sensitivity besides other factors. The third risk coefficient is called hazardous risk coefficient, which is due to anticipated hazards which may occur in the future and the risk is deduced from criteria of consequences on safety, environment, maintenance and economic risks with corresponding cost for consequences. The characteristic values of all the three risk coefficients are obtained with a particular test. With few more tests on the system, the values may change significantly within controlling range of each coefficient, hence `random number simulation' is resorted to obtain one distinctive value for each coefficient. The risk coefficients are statistically added to obtain final risk coefficient of each critical item and then the final rankings of critical items are estimated. The prioritization in ranking of critical items using the developed mathematical model for risk assessment shall be useful in optimization of financial losses and timing of maintenance actions.
NASA Astrophysics Data System (ADS)
Sembiring, N.; Panjaitan, N.; Saragih, A. F.
2018-02-01
PT. XYZ is a manufacturing company that produces fresh fruit bunches (FFB) to Crude Palm Oil (CPO) and Palm Kernel Oil (PKO). PT. XYZ consists of six work stations: receipt station, sterilizing station, thressing station, pressing station, clarification station, and kernelery station. So far, the company is still implementing corrective maintenance maintenance system for production machines where the machine repair is done after damage occurs. Problems at PT. XYZ is the absence of scheduling engine maintenance in a planned manner resulting in the engine often damaged which can disrupt the smooth production. Another factor that is the problem in this research is the kernel station environment that becomes less convenient for operators such as there are machines and equipment not used in the production area, slippery, muddy, scattered fibers, incomplete use of PPE, and lack of employee discipline. The most commonly damaged machine is in the seed processing station (kernel station) which is cake breaker conveyor machine. The solution of this problem is to propose a schedule plan for maintenance of the machine by using the method of reliability centered maintenance and also the application of 5S. The result of the application of Reliability Centered maintenance method is obtained four components that must be treated scheduled (time directed), namely: for bearing component is 37 days, gearbox component is 97 days, CBC pen component is 35 days and conveyor pedal component is 32 days While after identification the application of 5S obtained the proposed corporate environmental improvement measures in accordance with the principles of 5S where unused goods will be moved from the production area, grouping goods based on their use, determining the procedure of cleaning the production area, conducting inspection in the use of PPE, and making 5S slogans.
Reliability and Maintainability model (RAM) user and maintenance manual. Part 2
NASA Technical Reports Server (NTRS)
Ebeling, Charles E.
1995-01-01
This report documents the procedures for utilizing and maintaining the Reliability and Maintainability Model (RAM) developed by the University of Dayton for the NASA Langley Research Center (LaRC). The RAM model predicts reliability and maintainability (R&M) parameters for conceptual space vehicles using parametric relationships between vehicle design and performance characteristics and subsystem mean time between maintenance actions (MTBM) and manhours per maintenance action (MH/MA). These parametric relationships were developed using aircraft R&M data from over thirty different military aircraft of all types. This report describes the general methodology used within the model, the execution and computational sequence, the input screens and data, the output displays and reports, and study analyses and procedures. A source listing is provided.
Experimental adoption of RCM in EDF substations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heroin, G.; Aupied, J.; Sanchis, G.
1996-08-01
EDF, after testing Reliability Centered Maintenance (RCM) on systems used in nuclear power plants, has now successfully extended RCM to all of its nuclear power plants. In the light of this experience, EDF has committed itself to a pilot study on a line bay of a 400 kV substation in 1992. The RCM method as applied benefited from EDF`s policy of maintenance, introduced five years ago on all substations, which has enhanced prospects of reliability. The original feature in the selection of maintenance tasks was that it brought into play two criteria for failure assessment - frequency and seriousness -more » and two criteria for maintenance task selection - efficiency and facility. The final outcome of RCM as applied to substation maintenance is to categorize maintenance tasks into: (1) essential maintenance tasks, (2) optional tasks, depending on the type and location of the substation, as well as on factors relating to local management of maintenance policy, and (3) unnecessary tasks.« less
DATMAN: A reliability data analysis program using Bayesian updating
DOE Office of Scientific and Technical Information (OSTI.GOV)
Becker, M.; Feltus, M.A.
1996-12-31
Preventive maintenance (PM) techniques focus on the prevention of failures, in particular, system components that are important to plant functions. Reliability-centered maintenance (RCM) improves on the PM techniques by introducing a set of guidelines by which to evaluate the system functions. It also minimizes intrusive maintenance, labor, and equipment downtime without sacrificing system performance when its function is essential for plant safety. Both the PM and RCM approaches require that system reliability data be updated as more component failures and operation time are acquired. Systems reliability and the likelihood of component failures can be calculated by Bayesian statistical methods, whichmore » can update these data. The DATMAN computer code has been developed at Penn State to simplify the Bayesian analysis by performing tedious calculations needed for RCM reliability analysis. DATMAN reads data for updating, fits a distribution that best fits the data, and calculates component reliability. DATMAN provides a user-friendly interface menu that allows the user to choose from several common prior and posterior distributions, insert new failure data, and visually select the distribution that matches the data most accurately.« less
ERIC Educational Resources Information Center
Inozu, Bahadir; Ayyub, Bilal A.
1999-01-01
Examines the current status of existing curricula, accreditation requirements, and new developments in Naval Architecture and Marine Engineering education in the United States. Discusses the emerging needs of the maritime industry in light of advances in information technology and movement toward risk-based, reliability-centered rule making in the…
Ground Vehicle Condition Based Maintenance
2010-10-04
Diagnostic Process Map 32 FMEAs Developed : • Diesel Engine • Transmission • Alternators Analysis : • Identify failure modes • Derive design factors and...S&T Initiatives TARDEC P&D Process Map Component Testing ARL CBM Research AMSAA SDC & Terrain Modeling UNCLASSIFIED 3 CBM+ Overview...UNCLASSIFIED 4 RCM and CBM are core processes for CBM+ System Development • Army Regulation 750-1, 20 Sep 2007, p. 79 - Reliability Centered Maintenance (RCM
NASA Technical Reports Server (NTRS)
Ebeling, Charles E.
1996-01-01
This report documents the procedures for utilizing and maintaining the Reliability & Maintainability Model (RAM) developed by the University of Dayton for the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC). The purpose of the grant is to provide support to NASA in establishing operational and support parameters and costs of proposed space systems. As part of this research objective, the model described here was developed. This Manual updates and supersedes the 1995 RAM User and Maintenance Manual. Changes and enhancements from the 1995 version of the model are primarily a result of the addition of more recent aircraft and shuttle R&M data.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Choi, Y.A.; Feltus, M.A.
1995-07-01
Reliability-centered maintenance (RCM) methods are applied to boiling water reactor plant-specific emergency core cooling system probabilistic risk assessment (PRA) fault trees. The RCM is a technique that is system function-based, for improving a preventive maintenance (PM) program, which is applied on a component basis. Many PM programs are based on time-directed maintenance tasks, while RCM methods focus on component condition-directed maintenance tasks. Stroke time test data for motor-operated valves (MOVs) are used to address three aspects concerning RCM: (a) to determine if MOV stroke time testing was useful as a condition-directed PM task; (b) to determine and compare the plant-specificmore » MOV failure data from a broad RCM philosophy time period compared with a PM period and, also, compared with generic industry MOV failure data; and (c) to determine the effects and impact of the plant-specific MOV failure data on core damage frequency (CDF) and system unavailabilities for these emergency systems. The MOV stroke time test data from four emergency core cooling systems [i.e., high-pressure coolant injection (HPCI), reactor core isolation cooling (RCIC), low-pressure core spray (LPCS), and residual heat removal/low-pressure coolant injection (RHR/LPCI)] were gathered from Philadelphia Electric Company`s Peach Bottom Atomic Power Station Units 2 and 3 between 1980 and 1992. The analyses showed that MOV stroke time testing was not a predictor for eminent failure and should be considered as a go/no-go test. The failure data from the broad RCM philosophy showed an improvement compared with the PM-period failure rates in the emergency core cooling system MOVs. Also, the plant-specific MOV failure rates for both maintenance philosophies were shown to be lower than the generic industry estimates.« less
The air transportation industry birthplace of reliability-centered maintenance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matteson, T.D.
1996-08-01
The 1980s and 1970s provided a timely opportunity for examining and radically changing the process called {open_quotes}preventive maintenance{close_quotes} as it is applied to the aircraft used for scheduled air transportation. The Federal Aviation Administration and four major airlines, United, American, Pan American and Trans World, were the {open_quotes}principals{close_quotes} in that process. While United`s work with the FAA on the Boeing 737 had opened the door a crack, the Boeing 747 presented a major opportunity to radically improve the process for maintenance program design. That program was guided by the results of United`s analyses of failure data from operations of severalmore » fleets, each larger than 100 aircraft, and the concurrent experience of American, Pan American and Trans World. That knowledge provided the insights necessary to support an entirely different approach to maintenance program design. As a result, while United`s existing maintenance program required scheduled overhaul of 339 items on each DC-8, it required overhaul of only 8 items on the B-7471 Although the initial thrust of that work focused on components of active systems, there was concurrent work focused on items whose principal function was to carry the loads associated with operations. That program focused on the classification of structurally-significant items and their classification as {open_quotes}safe life{close_quotes} or {open_quotes}damage tolerant{close_quote} to determine what periodic replacements or repeated inspections were required. That work came to the attention of the Department of Defense which supported preparation of the book-length report by F. Stanley Nowlan and Howard F. Heap at United Airlines entitled {open_quote}Reliability-Centered maintenance{close_quotes}.« less
NASA Astrophysics Data System (ADS)
Pugh, Ray; Huff, Roy
1999-03-01
The importance of infrared (IR) technology and analysis in today's world of predictive maintenance and reliability- centered maintenance cannot be understated. The use of infrared is especially important in facilities that are required to maintain a high degree of equipment reliability because of plant or public safety concerns. As with all maintenance tools, particularly those used in predictive maintenance approaches, training plays a key role in their effectiveness and the benefit gained from their use. This paper details an effort to transfer IR technology to Soviet- designed nuclear power plants in Russia, Ukraine, and Lithuania. Delivery of this technology and post-delivery training activities have been completed recently at the Chornobyl nuclear power plant in Ukraine. Many interesting challenges were encountered during this effort. Hardware procurement and delivery of IR technology to a sensitive country were complicated by United States regulations. Freight and shipping infrastructure and host-country customs policies complicated hardware transport. Training activities were complicated by special hardware, software and training material translation needs, limited communication opportunities, and site logistical concerns. These challenges and others encountered while supplying the Chornobyl plant with state-of-the-art IR technology are described in this paper.
A particle swarm model for estimating reliability and scheduling system maintenance
NASA Astrophysics Data System (ADS)
Puzis, Rami; Shirtz, Dov; Elovici, Yuval
2016-05-01
Modifying data and information system components may introduce new errors and deteriorate the reliability of the system. Reliability can be efficiently regained with reliability centred maintenance, which requires reliability estimation for maintenance scheduling. A variant of the particle swarm model is used to estimate reliability of systems implemented according to the model view controller paradigm. Simulations based on data collected from an online system of a large financial institute are used to compare three component-level maintenance policies. Results show that appropriately scheduled component-level maintenance greatly reduces the cost of upholding an acceptable level of reliability by reducing the need in system-wide maintenance.
Optimizing preventive maintenance policy: A data-driven application for a light rail braking system.
Corman, Francesco; Kraijema, Sander; Godjevac, Milinko; Lodewijks, Gabriel
2017-10-01
This article presents a case study determining the optimal preventive maintenance policy for a light rail rolling stock system in terms of reliability, availability, and maintenance costs. The maintenance policy defines one of the three predefined preventive maintenance actions at fixed time-based intervals for each of the subsystems of the braking system. Based on work, maintenance, and failure data, we model the reliability degradation of the system and its subsystems under the current maintenance policy by a Weibull distribution. We then analytically determine the relation between reliability, availability, and maintenance costs. We validate the model against recorded reliability and availability and get further insights by a dedicated sensitivity analysis. The model is then used in a sequential optimization framework determining preventive maintenance intervals to improve on the key performance indicators. We show the potential of data-driven modelling to determine optimal maintenance policy: same system availability and reliability can be achieved with 30% maintenance cost reduction, by prolonging the intervals and re-grouping maintenance actions.
Optimizing preventive maintenance policy: A data-driven application for a light rail braking system
Corman, Francesco; Kraijema, Sander; Godjevac, Milinko; Lodewijks, Gabriel
2017-01-01
This article presents a case study determining the optimal preventive maintenance policy for a light rail rolling stock system in terms of reliability, availability, and maintenance costs. The maintenance policy defines one of the three predefined preventive maintenance actions at fixed time-based intervals for each of the subsystems of the braking system. Based on work, maintenance, and failure data, we model the reliability degradation of the system and its subsystems under the current maintenance policy by a Weibull distribution. We then analytically determine the relation between reliability, availability, and maintenance costs. We validate the model against recorded reliability and availability and get further insights by a dedicated sensitivity analysis. The model is then used in a sequential optimization framework determining preventive maintenance intervals to improve on the key performance indicators. We show the potential of data-driven modelling to determine optimal maintenance policy: same system availability and reliability can be achieved with 30% maintenance cost reduction, by prolonging the intervals and re-grouping maintenance actions. PMID:29278245
Advanced U.S. military aircraft battery systems
NASA Astrophysics Data System (ADS)
Flake, Richard A.; Eskra, Michael D.
1990-04-01
While most USAF aircraft currently use vented Ni-Cd for dc electrical power and emergency power, as well as the powering of lights and instruments prior to engine starting, these batteries have high maintenance requirements, low reliability, and no built-in testing capability with which to check battery health prior to flight. The USAF Wright R&D Center accordingly initiated its Advanced Maintenance-Free NiCd Battery System development program in 1986, in order to develop a sealed Ni-Cd battery which would remain maintenance-free over a period of three years. Attention is being given to a high power bipolar battery design in which there are no individual cell cases or cell interconnects.
Automated System Checkout to Support Predictive Maintenance for the Reusable Launch Vehicle
NASA Technical Reports Server (NTRS)
Patterson-Hine, Ann; Deb, Somnath; Kulkarni, Deepak; Wang, Yao; Lau, Sonie (Technical Monitor)
1998-01-01
The Propulsion Checkout and Control System (PCCS) is a predictive maintenance software system. The real-time checkout procedures and diagnostics are designed to detect components that need maintenance based on their condition, rather than using more conventional approaches such as scheduled or reliability centered maintenance. Predictive maintenance can reduce turn-around time and cost and increase safety as compared to conventional maintenance approaches. Real-time sensor validation, limit checking, statistical anomaly detection, and failure prediction based on simulation models are employed. Multi-signal models, useful for testability analysis during system design, are used during the operational phase to detect and isolate degraded or failed components. The TEAMS-RT real-time diagnostic engine was developed to utilize the multi-signal models by Qualtech Systems, Inc. Capability of predicting the maintenance condition was successfully demonstrated with a variety of data, from simulation to actual operation on the Integrated Propulsion Technology Demonstrator (IPTD) at Marshall Space Flight Center (MSFC). Playback of IPTD valve actuations for feature recognition updates identified an otherwise undetectable Main Propulsion System 12 inch prevalve degradation. The algorithms were loaded into the Propulsion Checkout and Control System for further development and are the first known application of predictive Integrated Vehicle Health Management to an operational cryogenic testbed. The software performed successfully in real-time, meeting the required performance goal of 1 second cycle time.
Developing RCM Strategy for Hydrogen Fuel Cells Utilizing On Line E-Condition Monitoring
NASA Astrophysics Data System (ADS)
Baglee, D.; Knowles, M. J.
2012-05-01
Fuel cell vehicles are considered to be a viable solution to problems such as carbon emissions and fuel shortages for road transport. Proton Exchange Membrane (PEM) Fuel Cells are mainly used in this purpose because they can run at low temperatures and have a simple structure. Yet high maintenance costs and the inherent dangers of maintaining equipment using hydrogen are two main issues which need to be addressed. The development of appropriate and efficient strategies is currently lacking with regard to fuel cell maintenance. A Reliability Centered Maintenance (RCM) approach offers considerable benefit to the management of fuel cell maintenance since it includes an identification and consideration of the impact of critical components. Technological developments in e-maintenance systems, radio-frequency identification (RFID) and personal digital assistants (PDAs) have proven to satisfy the increasing demand for improved reliability, efficiency and safety. RFID technology is used to store and remotely retrieve electronic maintenance data in order to provide instant access to up-to-date, accurate and detailed information. The aim is to support fuel cell maintenance decisions by developing and applying a blend of leading-edge communications and sensor technology including RFID. The purpose of this paper is to review and present the state of the art in fuel cell condition monitoring and maintenance utilizing RCM and RFID technologies. Using an RCM analysis critical components and fault modes are identified. RFID tags are used to store the critical information, possible faults and their cause and effect. The relationship between causes, faults, symptoms and long term implications of fault conditions are summarized. Finally conclusions are drawn regarding suggested maintenance strategies and the optimal structure for an integrated, cost effective condition monitoring and maintenance management system.
Kim, Youngmee; Evangelista, Lorraine S; Phillips, Linda R; Pavlish, Carol; Kopple, Joel D
2010-01-01
Reported treatment adherence rates of patients with end stage renal disease (ESRD) have been extremely varied due to lack of reliable and valid measurement tools. This study was conducted to develop and test an instrument to measure treatment adherence to hemodialysis (HD) attendance, medications, fluid restrictions, and diet prescription among patients with ESRD. This article describes the methodological approach used to develop and test the psychometric properties (such as reliability and validity) of the 46-item ESRD-Adherence Questionnaire (ESRD-AQ) in a cohort of patients receiving maintenance HD at dialysis centers in Los Angeles County. The ESRD-AQ is the first self-report instrument to address all components of adherence behaviors of patients with ESRD. The findings support that the instrument is reliable and valid and is easy to administer. Future studies are needed in a larger sample to determine whether additional modifications are needed.
Space Operations Center System Analysis: Requirements for a Space Operations Center, revision A
NASA Technical Reports Server (NTRS)
Woodcock, G. R.
1982-01-01
The system and program requirements for a space operations center as defined by systems analysis studies are presented as a guide for future study and systems definition. Topics covered include general requirements for safety, maintainability, and reliability, service and habitat modules, the health maintenance facility; logistics modules; the docking tunnel; and subsystem requirements (structures, electrical power, environmental control/life support; extravehicular activity; data management; communications and tracking; docking/berthing; flight control/propulsion; and crew support). Facilities for flight support, construction, satellite and mission servicing, and fluid storage are included as well as general purpose support equipment.
Improving Safety and Reliability of Space Auxiliary Power Units
NASA Technical Reports Server (NTRS)
Viterna, Larry A.
1998-01-01
Auxiliary Power Units (APU's) play a critical role in space vehicles. On the space shuttle, APU's provide the hydraulic power for the aerodynamic control surfaces, rocket engine gimballing, landing gear, and brakes. Future space vehicles, such as the Reusable Launch Vehicle, will also need APU's to provide electrical power for flight control actuators and other vehicle subsystems. Vehicle designers and mission managers have identified safety, reliability, and maintenance as the primary concerns for space APU's. In 1997, the NASA Lewis Research Center initiated an advanced technology development program to address these concerns.
Risk Based Reliability Centered Maintenance of DOD Fire Protection Systems
1999-01-01
2.2.3 Failure Mode and Effect Analysis ( FMEA )............................ 2.2.4 Failure Mode Risk Characterization...Step 2 - System functions and functional failures definition Step 3 - Failure mode and effect analysis ( FMEA ) Step 4 - Failure mode risk...system). The Interface Location column identifies the location where the FMEA of the fire protection system began or stopped. For example, for the fire
NASA Astrophysics Data System (ADS)
Zhang, Ding; Zhang, Yingjie
2017-09-01
A framework for reliability and maintenance analysis of job shop manufacturing systems is proposed in this paper. An efficient preventive maintenance (PM) policy in terms of failure effects analysis (FEA) is proposed. Subsequently, reliability evaluation and component importance measure based on FEA are performed under the PM policy. A job shop manufacturing system is applied to validate the reliability evaluation and dynamic maintenance policy. Obtained results are compared with existed methods and the effectiveness is validated. Some vague understandings for issues such as network modelling, vulnerabilities identification, the evaluation criteria of repairable systems, as well as PM policy during manufacturing system reliability analysis are elaborated. This framework can help for reliability optimisation and rational maintenance resources allocation of job shop manufacturing systems.
NASA Astrophysics Data System (ADS)
Caesarendra, W.; Kosasih, B.; Tjahjowidodo, T.; Ariyanto, M.; Daryl, LWQ; Pamungkas, D.
2018-04-01
Rapid and reliable information in slew bearing maintenance is not trivial issue. This paper presents the online monitoring system to assist maintenance engineer in order to monitor the bearing condition of low speed slew bearing in sheet metal company. The system is able to pass the vibration information from the place where the bearing and accelerometer sensors are attached to the data center; and from the data center it can be access by opening the online monitoring website from any place and by any person. The online monitoring system is built using some programming languages such as C language, MATLAB, PHP, HTML and CSS. Generally, the flow process is start with the automatic vibration data acquisition; then features are calculated from the acquired vibration data. These features are then sent to the data center; and form the data center, the vibration features can be seen through the online monitoring website. This online monitoring system has been successfully applied in School of Mechanical, Materials and Mechatronic Engineering, University of Wollongong.
78 FR 44475 - Protection System Maintenance Reliability Standard
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-24
... Protection System Maintenance--Phase 2 (Reclosing Relays)). 12. NERC states that the proposed Reliability... of the relay inputs and outputs that are essential to proper functioning of the protection system...] Protection System Maintenance Reliability Standard AGENCY: Federal Energy Regulatory Commission, Energy...
Autonomic Computing for Spacecraft Ground Systems
NASA Technical Reports Server (NTRS)
Li, Zhenping; Savkli, Cetin; Jones, Lori
2007-01-01
Autonomic computing for spacecraft ground systems increases the system reliability and reduces the cost of spacecraft operations and software maintenance. In this paper, we present an autonomic computing solution for spacecraft ground systems at NASA Goddard Space Flight Center (GSFC), which consists of an open standard for a message oriented architecture referred to as the GMSEC architecture (Goddard Mission Services Evolution Center), and an autonomic computing tool, the Criteria Action Table (CAT). This solution has been used in many upgraded ground systems for NASA 's missions, and provides a framework for developing solutions with higher autonomic maturity.
Space Flight Operations Center local area network
NASA Technical Reports Server (NTRS)
Goodman, Ross V.
1988-01-01
The existing Mission Control and Computer Center at JPL will be replaced by the Space Flight Operations Center (SFOC). One part of the SFOC is the LAN-based distribution system. The purpose of the LAN is to distribute the processed data among the various elements of the SFOC. The SFOC LAN will provide a robust subsystem that will support the Magellan launch configuration and future project adaptation. Its capabilities include (1) a proven cable medium as the backbone for the entire network; (2) hardware components that are reliable, varied, and follow OSI standards; (3) accurate and detailed documentation for fault isolation and future expansion; and (4) proven monitoring and maintenance tools.
78 FR 49595 - Aviation Rulemaking Advisory Committee-New Task
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-14
... the new ARAC activity and solicits membership for the Maintenance Reliability Program Working Group... establish the Maintenance Reliability Program Working Group. The working group will serve as staff to ARAC... programs. The Maintenance Reliability Program Working Group will provide advice and recommendations on the...
Reliability-centered maintenance for ground-based large optical telescopes and radio antenna arrays
NASA Astrophysics Data System (ADS)
Marchiori, G.; Formentin, F.; Rampini, F.
2014-07-01
In the last years, EIE GROUP has been more and more involved in large optical telescopes and radio antennas array projects. In this frame, the paper describes a fundamental aspect of the Logistic Support Analysis (LSA) process, that is the application of the Reliability-Centered Maintenance (RCM) methodology for the generation of maintenance plans for ground-based large optical telescopes and radio antennas arrays. This helps maintenance engineers to make sure that the telescopes continue to work properly, doing what their users require them to do in their present operating conditions. The main objective of the RCM process is to establish the complete maintenance regime, with the safe minimum required maintenance, carried out without any risk to personnel, telescope and subsystems. At the same time, a correct application of the RCM allows to increase the cost effectiveness, telescope uptime and items availability, and to provide greater understanding of the level of risk that the organization is managing. At the same time, engineers shall make a great effort since the initial phase of the project to obtain a telescope requiring easy maintenance activities and simple replacement of the major assemblies, taking special care on the accesses design and items location, implementation and design of special lifting equipment and handling devices for the heavy items. This maintenance engineering framework is based on seven points, which lead to the main steps of the RCM program. The initial steps of the RCM process consist of: system selection and data collection (MTBF, MTTR, etc.), definition of system boundaries and operating context, telescope description with the use of functional block diagrams, and the running of a FMECA to address the dominant causes of equipment failure and to lay down the Critical Items List. In the second part of the process the RCM logic is applied, which helps to determine the appropriate maintenance tasks for each identified failure mode. Once the logic is completed for all the analyzed items, the resulting Maintenance Program is compiled in order to preserve all the system important functions and to rationalize the tasks periodicities. Lastly, the RCM is kept alive throughout the entire life of the telescope, where the effectiveness of the maintenance is constantly reviewed and adjusted on the basis of the "lesson learned". In addition to the RCM analysis methodology, a second basic concept is applied for the telescope maintenance: to design and install components in such a manner to restore a failure and to perform servicing procedures as close as possible to the telescope, maximizing the replacement of Line Replaceable Units (LRUs) or Shop Replaceable Units (SRUs), rather than repair on-equipment.
49 CFR Appendix E to Part 238 - General Principles of Reliability-Based Maintenance Programs
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false General Principles of Reliability-Based... STANDARDS Pt. 238, App. E Appendix E to Part 238—General Principles of Reliability-Based Maintenance... maintenance programs are based on the following general principles. A failure is an unsatisfactory condition...
Flight control electronics reliability/maintenance study
NASA Technical Reports Server (NTRS)
Dade, W. W.; Edwards, R. H.; Katt, G. T.; Mcclellan, K. L.; Shomber, H. A.
1977-01-01
Collection and analysis of data are reported that concern the reliability and maintenance experience of flight control system electronics currently in use on passenger carrying jet aircraft. Two airlines B-747 airplane fleets were analyzed to assess the component reliability, system functional reliability, and achieved availability of the CAT II configuration flight control system. Also assessed were the costs generated by this system in the categories of spare equipment, schedule irregularity, and line and shop maintenance. The results indicate that although there is a marked difference in the geographic location and route pattern between the airlines studied, there is a close similarity in the reliability and the maintenance costs associated with the flight control electronics.
Mathematical Aspects of Reliability-Centered Maintenance
1977-01-01
exponential distribu~tion, .whose parameter (-hazard rate) can be realistically estimated., La ma SuWiaWItib~ This distribution is als4.. frequently...statistical methods to the study ýf hysicA3 reality was beset with .philosc\\phicsl problems arising from the irrefutable observacion that there isibut one...STATISTICS, 2nd ed. New York: John Wiley & Sons ; 1954. 5. Kolmogorov, A. Interpolation und Extrapolation von stationwren zuf-lligen Folgen. BULL. DE
Reliability-Centered Maintenance
1978-12-29
the pack through a flow-control valve and is cooled and dehumidified by a heat exchanger and the turbine of an air-cycle refrigeration ma- chine. The...dirt, moisture, and heat are the most susceptible to corrosion, and properly applied and maintained protective coatings are necessary to prevent...LFM’TNT i RCJL, ’A~r I ARLCA & WORK JNI- N UMUL R, United Airlines San Francisco International Airport San Francisco, Ca 94128 Office of Assistant
GTEX: An expert system for diagnosing faults in satellite ground stations
NASA Technical Reports Server (NTRS)
Schlegelmilch, Richard F.; Durkin, John; Petrik, Edward J.
1991-01-01
A proof of concept expert system called Ground Terminal Expert (GTEX) was developed at The University of Akron in collaboration with NASA Lewis Research Center. The objective of GTEX is to aid in diagnosing data faults occurring with a digital ground terminal. This strategy can also be applied to the Very Small Aperture Terminal (VSAT) technology. An expert system which detects and diagnoses faults would enhance the performance of the VSAT by improving reliability and reducing maintenance time. GTEX is capable of detecting faults, isolating the cause and recommending appropriate actions. Isolation of faults is completed to board-level modules. A graphical user interface provides control and a medium where data can be requested and cryptic information logically displayed. Interaction with GTEX consists of user responses and input from data files. The use of data files provides a method of simulating dynamic interaction between the digital ground terminal and the expert system. GTEX as described is capable of both improving reliability and reducing the time required for necessary maintenance.
GTEX: An expert system for diagnosing faults in satellite ground stations
NASA Astrophysics Data System (ADS)
Schlegelmilch, Richard F.; Durkin, John; Petrik, Edward J.
1991-11-01
A proof of concept expert system called Ground Terminal Expert (GTEX) was developed at The University of Akron in collaboration with NASA Lewis Research Center. The objective of GTEX is to aid in diagnosing data faults occurring with a digital ground terminal. This strategy can also be applied to the Very Small Aperture Terminal (VSAT) technology. An expert system which detects and diagnoses faults would enhance the performance of the VSAT by improving reliability and reducing maintenance time. GTEX is capable of detecting faults, isolating the cause and recommending appropriate actions. Isolation of faults is completed to board-level modules. A graphical user interface provides control and a medium where data can be requested and cryptic information logically displayed. Interaction with GTEX consists of user responses and input from data files. The use of data files provides a method of simulating dynamic interaction between the digital ground terminal and the expert system. GTEX as described is capable of both improving reliability and reducing the time required for necessary maintenance.
NASA Astrophysics Data System (ADS)
Sembiring, N.; Nasution, A. H.
2018-02-01
Corrective maintenance i.e replacing or repairing the machine component after machine break down always done in a manufacturing company. It causes the production process must be stopped. Production time will decrease due to the maintenance team must replace or repair the damage machine component. This paper proposes a preventive maintenance’s schedule for a critical component of a critical machine of an crude palm oil and kernel company due to increase maintenance efficiency. The Reliability Engineering & Maintenance Value Stream Mapping is used as a method and a tool to analize the reliability of the component and reduce the wastage in any process by segregating value added and non value added activities.
Optimal maintenance of a multi-unit system under dependencies
NASA Astrophysics Data System (ADS)
Sung, Ho-Joon
The availability, or reliability, of an engineering component greatly influences the operational cost and safety characteristics of a modern system over its life-cycle. Until recently, the reliance on past empirical data has been the industry-standard practice to develop maintenance policies that provide the minimum level of system reliability. Because such empirically-derived policies are vulnerable to unforeseen or fast-changing external factors, recent advancements in the study of topic on maintenance, which is known as optimal maintenance problem, has gained considerable interest as a legitimate area of research. An extensive body of applicable work is available, ranging from those concerned with identifying maintenance policies aimed at providing required system availability at minimum possible cost, to topics on imperfect maintenance of multi-unit system under dependencies. Nonetheless, these existing mathematical approaches to solve for optimal maintenance policies must be treated with caution when considered for broader applications, as they are accompanied by specialized treatments to ease the mathematical derivation of unknown functions in both objective function and constraint for a given optimal maintenance problem. These unknown functions are defined as reliability measures in this thesis, and theses measures (e.g., expected number of failures, system renewal cycle, expected system up time, etc.) do not often lend themselves to possess closed-form formulas. It is thus quite common to impose simplifying assumptions on input probability distributions of components' lifetime or repair policies. Simplifying the complex structure of a multi-unit system to a k-out-of-n system by neglecting any sources of dependencies is another commonly practiced technique intended to increase the mathematical tractability of a particular model. This dissertation presents a proposal for an alternative methodology to solve optimal maintenance problems by aiming to achieve the same end-goals as Reliability Centered Maintenance (RCM). RCM was first introduced to the aircraft industry in an attempt to bridge the gap between the empirically-driven and theory-driven approaches to establishing optimal maintenance policies. Under RCM, qualitative processes that enable the prioritizing of functions based on the criticality and influence would be combined with mathematical modeling to obtain the optimal maintenance policies. Where this thesis work deviates from RCM is its proposal to directly apply quantitative processes to model the reliability measures in optimal maintenance problem. First, Monte Carlo (MC) simulation, in conjunction with a pre-determined Design of Experiments (DOE) table, can be used as a numerical means of obtaining the corresponding discrete simulated outcomes of the reliability measures based on the combination of decision variables (e.g., periodic preventive maintenance interval, trigger age for opportunistic maintenance, etc.). These discrete simulation results can then be regressed as Response Surface Equations (RSEs) with respect to the decision variables. Such an approach to represent the reliability measures with continuous surrogate functions (i.e., the RSEs) not only enables the application of the numerical optimization technique to solve for optimal maintenance policies, but also obviates the need to make mathematical assumptions or impose over-simplifications on the structure of a multi-unit system for the sake of mathematical tractability. The applicability of the proposed methodology to a real-world optimal maintenance problem is showcased through its application to a Time Limited Dispatch (TLD) of Full Authority Digital Engine Control (FADEC) system. In broader terms, this proof-of-concept exercise can be described as a constrained optimization problem, whose objective is to identify the optimal system inspection interval that guarantees a certain level of availability for a multi-unit system. A variety of reputable numerical techniques were used to model the problem as accurately as possible, including algorithms for the MC simulation, imperfect maintenance model from quasi renewal processes, repair time simulation, and state transition rules. Variance Reduction Techniques (VRTs) were also used in an effort to enhance MC simulation efficiency. After accurate MC simulation results are obtained, the RSEs are generated based on the goodness-of-fit measure to yield as parsimonious model as possible to construct the optimization problem. Under the assumption of constant failure rate for lifetime distributions, the inspection interval from the proposed methodology was found to be consistent with the one from the common approach used in industry that leverages Continuous Time Markov Chain (CTMC). While the latter does not consider maintenance cost settings, the proposed methodology enables an operator to consider different types of maintenance cost settings, e.g., inspection cost, system corrective maintenance cost, etc., to result in more flexible maintenance policies. When the proposed methodology was applied to the same TLD of FADEC example, but under the more generalized assumption of strictly Increasing Failure Rate (IFR) for lifetime distribution, it was shown to successfully capture component wear-out, as well as the economic dependencies among the system components.
Sustaining Air Force Aging Aircraft into the 21st Century
2011-08-01
Yankel, AFMC CXI SAB Members: Mrs. Natalie Crawford Prof Mark Goorsky Mr. Neil Kacena Prof. David W. Miller Dr. Robert Schafrik Prof. Douglas...D. Eick Professor Mark S. Goorsky Mr. Neil G. Kacena Professor David W. Miller Dr. Robert E. Schafrik Dr. Douglas C. Schmidt Professor Daniel L...AFB, UT. Ivey, R., & Heath , R. (2011, April). Implementing MECSIP Through a Reliability Centered Maintenance Program for the Air Force C-130 SPO
Technical information report: Plasma melter operation, reliability, and maintenance analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hendrickson, D.W.
1995-03-14
This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.
78 FR 77574 - Protection System Maintenance Reliability Standard
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-24
... protection system component type, except that the maintenance program for all batteries associated with the... Electric System reliability and promoting efficiency through consolidation [of protection system-related... ITC that PRC-005-2 promotes efficiency by consolidating protection system maintenance requirements...
Training and quality assurance with the Structured Clinical Interview for DSM-IV (SCID-I/P).
Ventura, J; Liberman, R P; Green, M F; Shaner, A; Mintz, J
1998-06-15
Accuracy in psychiatric diagnosis is critical for evaluating the suitability of the subjects for entry into research protocols and for establishing comparability of findings across study sites. However, training programs in the use of diagnostic instruments for research projects are not well systematized. Furthermore, little information has been published on the maintenance of interrater reliability of diagnostic assessments. At the UCLA Research Center for Major Mental Illnesses, a Training and Quality Assurance Program for SCID interviewers was used to evaluate interrater reliability and diagnostic accuracy. Although clinically experienced interviewers achieved better interrater reliability and overall diagnostic accuracy than neophyte interviewers, both groups were able to achieve and maintain high levels of interrater reliability, diagnostic accuracy, and interviewer skill. At the first quality assurance check after training, there were no significant differences between experienced and neophyte interviewers in interrater reliability or diagnostic accuracy. Standardization of training and quality assurance procedures within and across research projects may make research findings from study sites more comparable.
1988-08-31
behavior/operational goals so tnat corrective action may be taken. Data produced by the IS activities form the basis for design/--1pport trade-offs while...rt7L:EC T Ef Approved for public release; distribution unlimited c R SOUTHWEST RESEARCH INSTITUTE SAN ANTONIO HOUSTON I SECURITY CLASSIFICATION OF THIS...DISTRIBUTION/AVAILABLITY OF REPORT Approved for public release; 2b. DECLASSIFICATION I DOWNGRADING SCHEDULE distribution unlimited 4 PERFORMING ORGANIZATION
NASA Technical Reports Server (NTRS)
Rafalik, Kerrie
2017-01-01
Johnson Space Center (JSC) provides research, engineering, development, integration, and testing of hardware and software technologies for exercise systems applications in support of human spaceflight. This includes sustaining the current suite of on-orbit exercise devices by reducing maintenance, addressing obsolescence, and increasing reliability through creative engineering solutions. Advanced exercise systems technology development efforts focus on the sustainment of crew's physical condition beyond Low Earth Orbit for extended mission durations with significantly reduced mass, volume, and power consumption when compared to the ISS.
NASA Technical Reports Server (NTRS)
Rafalik, Kerrie K.
2017-01-01
Johnson Space Center (JSC) provides research, engineering, development, integration, and testing of hardware and software technologies for exercise systems applications in support of human spaceflight. This includes sustaining the current suite of on-orbit exercise devices by reducing maintenance, addressing obsolescence, and increasing reliability through creative engineering solutions. Advanced exercise systems technology development efforts focus on the sustainment of crew's physical condition beyond Low Earth Orbit for extended mission durations with significantly reduced mass, volume, and power consumption when compared to the ISS.
NASA Astrophysics Data System (ADS)
Sembiring, N.; Panjaitan, N.; Angelita, S.
2018-02-01
PT. XYZ is a company owned by non-governmental organizations engaged in the field of production of rubber processing becoming crumb rubber. Part of the production is supported by some of machines and interacting equipment to achieve optimal productivity. Types of the machine that are used in the production process are Conveyor Breaker, Breaker, Rolling Pin, Hammer Mill, Mill Roll, Conveyor, Shredder Crumb, and Dryer. Maintenance system in PT. XYZ is corrective maintenance i.e. repairing or replacing the engine components after the crash on the machine. Replacement of engine components on corrective maintenance causes the machine to stop operating during the production process is in progress. The result is in the loss of production time due to the operator must replace the damaged engine components. The loss of production time can impact on the production targets which were not reached and lead to high loss costs. The cost for all components is Rp. 4.088.514.505. This cost is really high just for maintaining a Mill Roll Machine. Therefore PT. XYZ is needed to do preventive maintenance i.e. scheduling engine components and improving maintenance efficiency. The used methods are Reliability Engineering and Maintenance Value Stream Mapping (MVSM). The needed data in this research are the interval of time damage to engine components, opportunity cost, labor cost, component cost, corrective repair time, preventive repair time, Mean Time To Opportunity (MTTO), Mean Time To Repair (MTTR), and Mean Time To Yield (MTTY). In this research, the critical components of Mill Roll machine are Spier, Bushing, Bearing, Coupling and Roll. Determination of damage distribution, reliability, MTTF, cost of failure, cost of preventive, current state map, and future state map are done so that the replacement time for each critical component with the lowest maintenance cost and preparation of Standard Operation Procedure (SOP) are developed. For the critical component that has been determined, the Spier component replacement time interval is 228 days with a reliability value of 0,503171, Bushing component is 240 days with reliability value of 0.36861, Bearing component is 202 days with reliability value of 0,503058, Coupling component is 247 days with reliability value of 0,50108 and Roll component is 301 days with reliability value of 0,373525. The results show that the cost decreases from Rp 300,688,114 to Rp 244,384,371 obtained from corrective maintenance to preventive maintenance. While maintenance efficiency increases with the application of preventive maintenance i.e. for Spier component from 54,0540541% to 74,07407%, Bushing component from 52,3809524% to 68,75%, Bearing component from 40% to 52,63158%, Coupling component from 60.9756098% to 71.42857%, and Roll components from 64.516129% to 74.7663551%.
Paranal maintenance and CMMS experience
NASA Astrophysics Data System (ADS)
Montano, Nelson
2004-10-01
During the last four years of operations, low technical downtime has been one of the relevant records of the Paranal Observatory. From the beginning of the Very Large Telescope (VLT) project, European Southern Observatory (ESO) has considered the implementation of a proper maintenance strategy a fundamental point in order to ensure low technical down time and preserve the Observatory's assets. The implementation of the maintenance strategy was based on the following aspects: - Strong maintenance sense during the design stage. Line Replacement Unit (LRU) concept, standardization and modularity of the Observatory equipment - Creation of a dedicated team for Maintenance - The implementation of a Computerized Maintenance Management System After four operational years, the result of these aspects has exceeded the expectations; the Observatory has been operating with high availability under a sustainable strategy. The strengths of the maintenance strategy have been based on modern maintenance concepts applied by regular production companies, where any minute of down time involves high cost. The operation of the actual Paranal Maintenance System is based mainly on proactive activities, such as regular inspections, preventive maintenance (PM) and predictive maintenance (PdM) plans. Nevertheless, it has been necessary to implement a strong plan for corrective maintenance (CM). The Spare Parts Strategy has also been an important point linked to the Maintenance Strategy and CMMS implementation. At present, almost 4,000 items related to the Observatory spare parts are loaded into the CMMS database. Currently, we are studying the implementation of a Reliability Centered Maintenance (RCM) project in one of our critical systems The following document presents the actual status of the Paranal Maintenance Strategy and which have been the motivations to implement the established strategy.
Development of a Computerised Method of Determining Aircraft Maintenance Intervals.
1985-09-01
Reliability. Vol.17. 1978. pp461-464. 23. , and Shunji Osaki. "Optimum Preventive Maintenance Policies for a 2-Unit Redundant System." IEEE...Transactions on Reliability. Vol.R-23. No.2. June 1974. pp86-91. 24. _ _, and Shunji Osaki. "A Summary of Optimum Preventive Maintenance Policies for a Two-Unit
Survey points to practices that reduce refinery maintenance spending
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ricketts, R.
During the past decade, Solomon Associates Inc., Dallas, has conducted several comparative analyses of maintenance costs in the refining industry. These investigations have brought to light maintenance practices and reliability improvement activities that are responsible for the wide range of maintenance costs recorded by refineries. Some of the practices are of an organizational nature and thus are of interest to managers reviewing their operations. The paper discusses maintenance costs; profitability; cost trends; equipment availability; funds application; two basic organizational approached to maintenance (repair-focused organization and reliability-focused organization); low-cost practices; and organizational style.
An Analytical Performance Assessment of a Fuel Cell-powered, Small Electric Airplane
NASA Technical Reports Server (NTRS)
Berton, Jeffrey J.; Freeh, Joshua E.; Wickenheiser, Timothy J.
2003-01-01
Rapidly emerging fuel cell power technologies may be used to launch a new revolution of electric propulsion systems for light aircraft. Future small electric airplanes using fuel cell technologies hold the promise of high reliability, low maintenance, low noise, and with exception of water vapor zero emissions. This paper describes an analytical feasibility and performance assessment conducted by NASA's Glenn Research Center of a fuel cell-powered, propeller-driven, small electric airplane based on a model of the MCR 01 two-place kitplane.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Protection and maintenance of contract center... Funding, Site Selection, and Facilities Management § 638.306 Protection and maintenance of contract center... and maintenance of contract center facilities owned or leased by Job Corps which shall be consistent...
The Author’s Guide To Writing 412th Test Wing Technical Reports
2014-12-01
control CAD computer aided design cc cubic centimeters C.O. carry-over c/o checkout USAF United States Air Force C1 rolling moment coefficient...cooling air. Mission Impact: Results in maintenance inability to reliably duplicate and isolate valid aircraft failures, and degrades reliability...air. Mission Impact: Results in maintenance inability to reliably duplicate and isolate valid aircraft failures, and degrades reliability of system
Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance
Facility Ryder Opens Natural Gas Vehicle Maintenance Facility to someone by E-mail Share Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Facebook Tweet about Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Twitter Bookmark
Chapter 15: Reliability of Wind Turbines
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sheng, Shuangwen; O'Connor, Ryan
The global wind industry has witnessed exciting developments in recent years. The future will be even brighter with further reductions in capital and operation and maintenance costs, which can be accomplished with improved turbine reliability, especially when turbines are installed offshore. One opportunity for the industry to improve wind turbine reliability is through the exploration of reliability engineering life data analysis based on readily available data or maintenance records collected at typical wind plants. If adopted and conducted appropriately, these analyses can quickly save operation and maintenance costs in a potentially impactful manner. This chapter discusses wind turbine reliability bymore » highlighting the methodology of reliability engineering life data analysis. It first briefly discusses fundamentals for wind turbine reliability and the current industry status. Then, the reliability engineering method for life analysis, including data collection, model development, and forecasting, is presented in detail and illustrated through two case studies. The chapter concludes with some remarks on potential opportunities to improve wind turbine reliability. An owner and operator's perspective is taken and mechanical components are used to exemplify the potential benefits of reliability engineering analysis to improve wind turbine reliability and availability.« less
Study of turboprop systems reliability and maintenance costs
NASA Technical Reports Server (NTRS)
1978-01-01
The overall reliability and maintenance costs (R&MC's) of past and current turboprop systems were examined. Maintenance cost drivers were found to be scheduled overhaul (40%), lack of modularity particularly in the propeller and reduction gearbox, and lack of inherent durability (reliability) of some parts. Comparisons were made between the 501-D13/54H60 turboprop system and the widely used JT8D turbofan. It was found that the total maintenance cost per flight hour of the turboprop was 75% higher than that of the JT8D turbofan. Part of this difference was due to propeller and gearbox costs being higher than those of the fan and reverser, but most of the difference was in the engine core where the older technology turboprop core maintenance costs were nearly 70 percent higher than for the turbofan. The estimated maintenance cost of both the advanced turboprop and advanced turbofan were less than the JT8D. The conclusion was that an advanced turboprop and an advanced turbofan, using similar cores, will have very competitive maintenance costs per flight hour.
Magasi, Susan; Wong, Alex; Miskovic, Ana; Tulsky, David; Heinemann, Allen W
2018-01-01
To test the effect that indicators of mobility device quality have on participation outcomes in community-dwelling adults with spinal cord injury, traumatic brain injury, and stroke by using structural equation modeling. Survey, cross-sectional study, and model testing. Clinical research space at 2 academic medical centers and 1 free-standing rehabilitation hospital. Community-dwelling adults (N=250; mean age, 48±14.3y) with spinal cord injury, traumatic brain injury, and stroke. Not applicable. The Mobility Device Impact Scale, Patient-Reported Outcomes Measurement Information System Social Function (version 2.0) scale, including Ability to Participate in Social Roles and Activities and Satisfaction with Social Roles and Activities, and the 2 Community Participation Indicators' enfranchisement scales. Details about device quality (reparability, reliability, ease of maintenance) and device type were also collected. Respondents used ambulation aids (30%), manual (34%), and power wheelchairs (30%). Indicators of device quality had a moderating effect on participation outcomes, with 3 device quality variables (repairability, ease of maintenance, device reliability) accounting for 20% of the variance in participation. Wheelchair users reported lower participation enfranchisement than did ambulation aid users. Mobility device quality plays an important role in participation outcomes. It is critical that people have access to mobility devices and that these devices be reliable. Copyright © 2017 American Congress of Rehabilitation Medicine. Published by Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, Valerie A.; Ogilvie, Alistair B.
2012-01-01
This report addresses the general data requirements for reliability analysis of fielded wind turbines and other wind plant equipment. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific data recommendations for a Computerized Maintenance Management System (CMMS) to support automated analysis. This data collection recommendations report was written by Sandia National Laboratories to address the general data requirements for reliability analysis of operating wind turbines. This report is intended to help develop a basic understanding of the data needed for reliability analysis frommore » a Computerized Maintenance Management System (CMMS) and other data systems. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific recommendations for a CMMS to support automated analysis. Though written for reliability analysis of wind turbines, much of the information is applicable to a wider variety of equipment and analysis and reporting needs. The 'Motivation' section of this report provides a rationale for collecting and analyzing field data for reliability analysis. The benefits of this type of effort can include increased energy delivered, decreased operating costs, enhanced preventive maintenance schedules, solutions to issues with the largest payback, and identification of early failure indicators.« less
NASA Astrophysics Data System (ADS)
Ighravwe, D. E.; Oke, S. A.; Adebiyi, K. A.
2018-03-01
This paper draws on the "human reliability" concept as a structure for gaining insight into the maintenance workforce assessment in a process industry. Human reliability hinges on developing the reliability of humans to a threshold that guides the maintenance workforce to execute accurate decisions within the limits of resources and time allocations. This concept offers a worthwhile point of deviation to encompass three elegant adjustments to literature model in terms of maintenance time, workforce performance and return-on-workforce investments. These fully explain the results of our influence. The presented structure breaks new grounds in maintenance workforce theory and practice from a number of perspectives. First, we have successfully implemented fuzzy goal programming (FGP) and differential evolution (DE) techniques for the solution of optimisation problem in maintenance of a process plant for the first time. The results obtained in this work showed better quality of solution from the DE algorithm compared with those of genetic algorithm and particle swarm optimisation algorithm, thus expressing superiority of the proposed procedure over them. Second, the analytical discourse, which was framed on stochastic theory, focusing on specific application to a process plant in Nigeria is a novelty. The work provides more insights into maintenance workforce planning during overhaul rework and overtime maintenance activities in manufacturing systems and demonstrated capacity in generating substantially helpful information for practice.
Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In
Electric Vehicles Maintenance and Safety of Hybrid and Plug-In Electric Vehicles to someone by E-mail Share Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In Electric Vehicles on Facebook Tweet about Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug
Extended Operation of Stirling Convertors at NASA Glenn Research Center
NASA Technical Reports Server (NTRS)
Oriti, Salvatore
2011-01-01
Glenn Research Center (GRC) is supporting life and reliability database for free-piston Stirilng conversion via extended convertor operation Ongoing convertor operation: 18 convertors (4 TDCs from Infinia, 14 ASCs from Sunpower). 350,000 total convertor hours of operation. 218,000 on Infinia units and 132,000 on Sunpower units. Demonstrating steady convertor performance requires precise maintenance of operating conditions. Sources of disruption : Investigative tests: Varying operating frequency, hot-end temp, cold-end temp. Hot end control method: Constant heat input mode requires more user-adjustment than constant temperature mode. Long-term transients in hot end insulation were observed. Support facility: Open-bath circulator fluid concentration drifting. Nuisance shutdowns (instrumentation failure, EMI, power outages). Ambient temperature fluctuations due to room HVAC.
1988-06-01
Di’Lt. ibu601’. I j I o; DTIC Qt.ALTTY I ,2,1 4 AMERICAN POWER JET COMPANY RIDGEFIELD, NJ FALLS CHURCH...The logic is applied to each reparable item in the system/equipment. When the components have been analyzed, an overall system/equipment analysis is...in the AMSDL as applicable to the referenced DIDs of interest. 5. Apply staff experience in logistics support analysis to assure that the intent of the
Implementation method of multi-terminal DC control system
NASA Astrophysics Data System (ADS)
Yi, Liu; Hao-Ran, Huang; Jun-Wen, Zhou; Hong-Guang, Guo; Yu-Yong, Zhou
2018-04-01
Currently the multi-terminal DC system (MTDC) has more stations. Each station needs operators to monitor and control the device. It needs much more operation and maintenance, low efficiency and small reliability; for the most important reason, multi-terminal DC system has complex control mode. If one of the stations has some problem, the control of the whole system should have problems. According to research of the characteristics of multi-terminal DC (VSC-MTDC) systems, this paper presents a strong implementation of the multi-terminal DC Supervisory Control and Data Acquisition (SCADA) system. This system is intelligent, can be networking, integration and intelligent. A master control system is added in each station to communication with the other stations to send current and DC voltage value to pole control system for each station. Based on the practical application and information feedback in the China South Power Grid research center VSC-MTDC project, this system is higher efficiency and save the cost on the maintenance of convertor station to improve the intelligent level and comprehensive effect. And because of the master control system, a multi-terminal system hierarchy coordination control strategy is formed, this make the control and protection system more efficiency and reliability.
Capacity and reliability analyses with applications to power quality
NASA Astrophysics Data System (ADS)
Azam, Mohammad; Tu, Fang; Shlapak, Yuri; Kirubarajan, Thiagalingam; Pattipati, Krishna R.; Karanam, Rajaiah
2001-07-01
The deregulation of energy markets, the ongoing advances in communication networks, the proliferation of intelligent metering and protective power devices, and the standardization of software/hardware interfaces are creating a dramatic shift in the way facilities acquire and utilize information about their power usage. The currently available power management systems gather a vast amount of information in the form of power usage, voltages, currents, and their time-dependent waveforms from a variety of devices (for example, circuit breakers, transformers, energy and power quality meters, protective relays, programmable logic controllers, motor control centers). What is lacking is an information processing and decision support infrastructure to harness this voluminous information into usable operational and management knowledge to handle the health of their equipment and power quality, minimize downtime and outages, and to optimize operations to improve productivity. This paper considers the problem of evaluating the capacity and reliability analyses of power systems with very high availability requirements (e.g., systems providing energy to data centers and communication networks with desired availability of up to 0.9999999). The real-time capacity and margin analysis helps operators to plan for additional loads and to schedule repair/replacement activities. The reliability analysis, based on computationally efficient sum of disjoint products, enables analysts to decide the optimum levels of redundancy, aids operators in prioritizing the maintenance options for a given budget and monitoring the system for capacity margin. The resulting analytical and software tool is demonstrated on a sample data center.
A Capacity Forecast Model for Volatile Data in Maintenance Logistics
NASA Astrophysics Data System (ADS)
Berkholz, Daniel
2009-05-01
Maintenance, repair and overhaul processes (MRO processes) are elaborate and complex. Rising demands on these after sales services require reliable production planning and control methods particularly for maintaining valuable capital goods. Downtimes lead to high costs and an inability to meet delivery due dates results in severe contract penalties. Predicting the required capacities for maintenance orders in advance is often difficult due to unknown part conditions unless the goods are actually inspected. This planning uncertainty results in extensive capital tie-up by rising stock levels within the whole MRO network. The article outlines an approach to planning capacities when maintenance data forecasting is volatile. It focuses on the development of prerequisites for a reliable capacity planning model. This enables a quick response to maintenance orders by employing appropriate measures. The information gained through the model is then systematically applied to forecast both personnel capacities and the demand for spare parts. The improved planning reliability can support MRO service providers in shortening delivery times and reducing stock levels in order to enhance the performance of their maintenance logistics.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-22
...] Version One Regional Reliability Standards for Facilities Design, Connections, and Maintenance; Protection and Control; and Voltage and Reactive December 17, 2010. AGENCY: Federal Energy Regulatory Commission..., voltage and current sensing devices, station batteries and DC control circuitry). By contrast, the...
Object-Oriented Technology-Based Software Library for Operations of Water Reclamation Centers
NASA Astrophysics Data System (ADS)
Otani, Tetsuo; Shimada, Takehiro; Yoshida, Norio; Abe, Wataru
SCADA systems in water reclamation centers have been constructed based on hardware and software that each manufacturer produced according to their design. Even though this approach used to be effective to realize real-time and reliable execution, it is an obstacle to cost reduction about system construction and maintenance. A promising solution to address the problem is to set specifications that can be used commonly. In terms of software, information model approach has been adopted in SCADA systems in other field, such as telecommunications and power systems. An information model is a piece of software specification that describes a physical or logical object to be monitored. In this paper, we propose information models for operations of water reclamation centers, which have not ever existed. In addition, we show the feasibility of the information model in terms of common use and processing performance.
Selecting statistical model and optimum maintenance policy: a case study of hydraulic pump.
Ruhi, S; Karim, M R
2016-01-01
Proper maintenance policy can play a vital role for effective investigation of product reliability. Every engineered object such as product, plant or infrastructure needs preventive and corrective maintenance. In this paper we look at a real case study. It deals with the maintenance of hydraulic pumps used in excavators by a mining company. We obtain the data that the owner had collected and carry out an analysis and building models for pump failures. The data consist of both failure and censored lifetimes of the hydraulic pump. Different competitive mixture models are applied to analyze a set of maintenance data of a hydraulic pump. Various characteristics of the mixture models, such as the cumulative distribution function, reliability function, mean time to failure, etc. are estimated to assess the reliability of the pump. Akaike Information Criterion, adjusted Anderson-Darling test statistic, Kolmogrov-Smirnov test statistic and root mean square error are considered to select the suitable models among a set of competitive models. The maximum likelihood estimation method via the EM algorithm is applied mainly for estimating the parameters of the models and reliability related quantities. In this study, it is found that a threefold mixture model (Weibull-Normal-Exponential) fits well for the hydraulic pump failures data set. This paper also illustrates how a suitable statistical model can be applied to estimate the optimum maintenance period at a minimum cost of a hydraulic pump.
NASA Technical Reports Server (NTRS)
1982-01-01
Primary and automatic flight controls are combined for a total flight control reliability and maintenance cost data base using information from two previous reports and additional cost data gathered from a major airline. A comparison of the current B-747 flight control system effects on reliability and operating cost with that of a B-747 designed for an active control wing load alleviation system is provided.
Next market opportunities for phosphoric acid fuel cells
DOE Office of Scientific and Technical Information (OSTI.GOV)
McClelland, R.H.
Key early entry markets for the next step PC25 Model C fuel cell are most likely to include: Premium Quality Power markets such as data centers, communications facilities, and the like; Healthcare Facilities, particularly for nursing homes and hospitals having 300 or more beds, here, the thermal side of a 200 kW fuel cell is an excellent match and some importance is also attached to power quality and reliability; and Auxiliary Electric Power at natural gas compression facilities, such facilities also tend to place a premium on reliability and low maintenance, moreover, the fuel cell`s inherently low emissions can bemore » very important within the northeast Ozone Transport Region. For the fuel cell concept to remain viable, penetration of this class of early entry markets is needed to sustain economic and reliability progress within a goal of moderate production volumes. This can then build the needed bridge to further markets and to other emerging fuel cell technologies.« less
Reducing maintenance costs in agreement with CNC machine tools reliability
NASA Astrophysics Data System (ADS)
Ungureanu, A. L.; Stan, G.; Butunoi, P. A.
2016-08-01
Aligning maintenance strategy with reliability is a challenge due to the need to find an optimal balance between them. Because the various methods described in the relevant literature involve laborious calculations or use of software that can be costly, this paper proposes a method that is easier to implement on CNC machine tools. The new method, called the Consequence of Failure Analysis (CFA) is based on technical and economic optimization, aimed at obtaining a level of required performance with minimum investment and maintenance costs.
20. SITE BUILDING 002 SCANNER BUILDING IN COMPUTER ...
20. SITE BUILDING 002 - SCANNER BUILDING - IN COMPUTER ROOM LOOKING AT "CONSOLIDATED MAINTENANCE OPERATIONS CENTER" JOB AREA AND OPERATION WORK CENTER. TASKS INCLUDE RADAR MAINTENANCE, COMPUTER MAINTENANCE, CYBER COMPUTER MAINTENANCE AND RELATED ACTIVITIES. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
ERIC Educational Resources Information Center
Ramalhoto, M. F.
1999-01-01
Introduces a special theme journal issue on research and education in quality control, maintenance, reliability, risk analysis, and safety. Discusses each of these theme concepts and their applications to naval architecture, marine engineering, and industrial engineering. Considers the effects of the rapid transfer of research results through…
A proven approach for more effective software development and maintenance
NASA Technical Reports Server (NTRS)
Pajerski, Rose; Hall, Dana; Sinclair, Craig
1994-01-01
Modern space flight mission operations and associated ground data systems are increasingly dependent upon reliable, quality software. Critical functions such as command load preparation, health and status monitoring, communications link scheduling and conflict resolution, and transparent gateway protocol conversion are routinely performed by software. Given budget constraints and the ever increasing capabilities of processor technology, the next generation of control centers and data systems will be even more dependent upon software across all aspects of performance. A key challenge now is to implement improved engineering, management, and assurance processes for the development and maintenance of that software; processes that cost less, yield higher quality products, and that self-correct for continual improvement evolution. The NASA Goddard Space Flight Center has a unique experience base that can be readily tapped to help solve the software challenge. Over the past eighteen years, the Software Engineering Laboratory within the code 500 Flight Dynamics Division has evolved a software development and maintenance methodology that accommodates the unique characteristics of an organization while optimizing and continually improving the organization's software capabilities. This methodology relies upon measurement, analysis, and feedback much analogous to that of control loop systems. It is an approach with a time-tested track record proven through repeated applications across a broad range of operational software development and maintenance projects. This paper describes the software improvement methodology employed by the Software Engineering Laboratory, and how it has been exploited within the Flight Dynamics Division with GSFC Code 500. Examples of specific improvement in the software itself and its processes are presented to illustrate the effectiveness of the methodology. Finally, the initial findings are given when this methodology was applied across the mission operations and ground data systems software domains throughout Code 500.
WITS - A Coaxial Cable Bus Network for Medical Applications
LaSonde, Clarence J.
1980-01-01
Walter Reed ARMY Medical Center has been serving as a Army test bed for coaxial cable-based local area networks since early 1978. This particular network, called the WRAMC Information Transfer System (WITS), carries commercial television, FM radio, closed-circuit TV and maintenance intercom audio, as well as digital data. The technology has proven successful. Broadband coaxial cable systems provide an opportunity to realize communications architectures that are flexible, highly reliable, and inexpensive. They are particularly appropriate for use in medical facilities where applications change over time and when many and varied systems are required to interact together.
Technology demonstrator program for Space Station Environmental Control Life Support System
NASA Technical Reports Server (NTRS)
Adams, Alan M.; Platt, Gordon K.; Claunch, William C.; Humphries, William R.
1987-01-01
The main objectives and requirements of the NASA/Marshall Space Flight Center Technology Demonstration Program are discussed. The program consists of a comparative test and a 90-day manned system test to evaluate an Environmental Control and Life Support System (ECLSS). In the comparative test phase, 14 types of subsystems which perform oxygen and water reclamation functions are to be examined in terms of performance maintenance/service requirements, reliability, and safety. The manned chamber testing phase involves a four person crew using a partial ECLSS for 90 days. The schedule for the program and the program hardware requirements are described.
Integration of RAMS in LCC analysis for linear transport infrastructures. A case study for railways.
NASA Astrophysics Data System (ADS)
Calle-Cordón, Álvaro; Jiménez-Redondo, Noemi; Morales-Gámiz, F. J.; García-Villena, F. A.; Garmabaki, Amir H. S.; Odelius, Johan
2017-09-01
Life-cycle cost (LCC) analysis is an economic technique used to assess the total costs associated with the lifetime of a system in order to support decision making in long term strategic planning. For complex systems, such as railway and road infrastructures, the cost of maintenance plays an important role in the LCC analysis. Costs associated with maintenance interventions can be more reliably estimated by integrating the probabilistic nature of the failures associated to these interventions in the LCC models. Reliability, Maintainability, Availability and Safety (RAMS) parameters describe the maintenance needs of an asset in a quantitative way by using probabilistic information extracted from registered maintenance activities. Therefore, the integration of RAMS in the LCC analysis allows obtaining reliable predictions of system maintenance costs and the dependencies of these costs with specific cost drivers through sensitivity analyses. This paper presents an innovative approach for a combined RAMS & LCC methodology for railway and road transport infrastructures being developed under the on-going H2020 project INFRALERT. Such RAMS & LCC analysis provides relevant probabilistic information to be used for condition and risk-based planning of maintenance activities as well as for decision support in long term strategic investment planning.
49 CFR Appendix E to Part 238 - General Principles of Reliability-Based Maintenance Programs
Code of Federal Regulations, 2011 CFR
2011-10-01
... that have already occurred but were not evident to the operating crew. (b) Components or systems in a... shows decreasing reliability with increasing operating age. An age/time limit may be used to reduce the... maintenance of a component or system to protect the safety and operating capability of the equipment, a number...
49 CFR Appendix E to Part 238 - General Principles of Reliability-Based Maintenance Programs
Code of Federal Regulations, 2013 CFR
2013-10-01
... that have already occurred but were not evident to the operating crew. (b) Components or systems in a... shows decreasing reliability with increasing operating age. An age/time limit may be used to reduce the... maintenance of a component or system to protect the safety and operating capability of the equipment, a number...
49 CFR Appendix E to Part 238 - General Principles of Reliability-Based Maintenance Programs
Code of Federal Regulations, 2012 CFR
2012-10-01
... that have already occurred but were not evident to the operating crew. (b) Components or systems in a... shows decreasing reliability with increasing operating age. An age/time limit may be used to reduce the... maintenance of a component or system to protect the safety and operating capability of the equipment, a number...
49 CFR Appendix E to Part 238 - General Principles of Reliability-Based Maintenance Programs
Code of Federal Regulations, 2014 CFR
2014-10-01
... that have already occurred but were not evident to the operating crew. (b) Components or systems in a... shows decreasing reliability with increasing operating age. An age/time limit may be used to reduce the... maintenance of a component or system to protect the safety and operating capability of the equipment, a number...
Failure rate and reliability of the KOMATSU hydraulic excavator in surface limestone mine
NASA Astrophysics Data System (ADS)
Harish Kumar N., S.; Choudhary, R. P.; Murthy, Ch. S. N.
2018-04-01
The model with failure rate function of bathtub-shaped is helpful in reliability analysis of any system and particularly in reliability associated privative maintenance. The usual Weibull distribution is, however, not capable to model the complete lifecycle of the any with a bathtub-shaped failure rate function. In this paper, failure rate and reliability analysis of the KOMATSU hydraulic excavator/shovel in surface mine is presented and also to improve the reliability and decrease the failure rate of each subsystem of the shovel based on the preventive maintenance. The model of the bathtub-shaped for shovel can also be seen as a simplification of the Weibull distribution.
14 CFR 171.103 - Requests for IFR procedure.
Code of Federal Regulations, 2010 CFR
2010-01-01
... facility. (3) A proposed maintenance organization and a maintenance manual that meets the requirements of... facility has an acceptable level of operational reliability as prescribed in § 171.111(k), and an... the results and of any required changes in the facility or the maintenance manual or maintenance...
Risk-based maintenance of ethylene oxide production facilities.
Khan, Faisal I; Haddara, Mahmoud R
2004-05-20
This paper discusses a methodology for the design of an optimum inspection and maintenance program. The methodology, called risk-based maintenance (RBM) is based on integrating a reliability approach and a risk assessment strategy to obtain an optimum maintenance schedule. First, the likely equipment failure scenarios are formulated. Out of many likely failure scenarios, the ones, which are most probable, are subjected to a detailed study. Detailed consequence analysis is done for the selected scenarios. Subsequently, these failure scenarios are subjected to a fault tree analysis to determine their probabilities. Finally, risk is computed by combining the results of the consequence and the probability analyses. The calculated risk is compared against known acceptable criteria. The frequencies of the maintenance tasks are obtained by minimizing the estimated risk. A case study involving an ethylene oxide production facility is presented. Out of the five most hazardous units considered, the pipeline used for the transportation of the ethylene is found to have the highest risk. Using available failure data and a lognormal reliability distribution function human health risk factors are calculated. Both societal risk factors and individual risk factors exceeded the acceptable risk criteria. To determine an optimal maintenance interval, a reverse fault tree analysis was used. The maintenance interval was determined such that the original high risk is brought down to an acceptable level. A sensitivity analysis is also undertaken to study the impact of changing the distribution of the reliability model as well as the error in the distribution parameters on the maintenance interval.
Reliability of digital reactor protection system based on extenics.
Zhao, Jing; He, Ya-Nan; Gu, Peng-Fei; Chen, Wei-Hua; Gao, Feng
2016-01-01
After the Fukushima nuclear accident, safety of nuclear power plants (NPPs) is widespread concerned. The reliability of reactor protection system (RPS) is directly related to the safety of NPPs, however, it is difficult to accurately evaluate the reliability of digital RPS. The method is based on estimating probability has some uncertainties, which can not reflect the reliability status of RPS dynamically and support the maintenance and troubleshooting. In this paper, the reliability quantitative analysis method based on extenics is proposed for the digital RPS (safety-critical), by which the relationship between the reliability and response time of RPS is constructed. The reliability of the RPS for CPR1000 NPP is modeled and analyzed by the proposed method as an example. The results show that the proposed method is capable to estimate the RPS reliability effectively and provide support to maintenance and troubleshooting of digital RPS system.
Rail Transit System Maintenance Practices for Automatic Fare Collection Equipment
DOT National Transportation Integrated Search
1984-05-01
A review of rail transit system maintenance practices for automatic fare collection (AFC) equipment was performed. This study supports an UMTA sponsored program to improve the reliability of AFC equipment. The maintenance practices of the transit sys...
National Wind Technology Center Dynamic 5-Megawatt Dynamometer
Felker, Fort
2018-06-06
The National Wind Technology Center (NWTC) offers wind industry engineers a unique opportunity to conduct a wide range of tests. Its custom-designed dynamometers can test wind turbine systems from 1 kilowatt (kW) to 5 megawatts (MW). The NWTC's new dynamometer facility simulates operating field conditions to assess the reliability and performance of wind turbine prototypes and commercial machines, thereby reducing deployment time, failures, and maintenance or replacement costs. Funded by the U.S. Department of Energy with American Recovery and Reinvestment Act (ARRA) funds, the 5-MW dynamometer will provide the ability to test wind turbine drivetrains and connect those drivetrains directly to the electricity grid or through a controllable grid interface (CGI). The CGI tests the low-voltage ride-through capability of a drivetrain as well as its response to faults and other abnormal grid conditions.
Lessa, Paula Renata Amorim; Ribeiro, Samila Gomes; Aquino, Priscila de Souza; de Almeida, Paulo Cesar; Pinheiro, Ana Karina Bezerra
2015-01-01
Objectives: the aim was to translate and culturally adapt the Adherence Determinants Questionnaire scale for the Portuguese language in the Brazilian context, and to check its reliability and validity to analyze the elements of the adherence of patients to the clinical treatment for breast and cervical cancer. Method: this was a methodological study, carried out in two oncology reference centers. The sample consisted of 198 participants, with 152 being treated for breast cancer and 46 being treated for cervical cancer. The content validation was performed by a committee of experts. The construct validation was demonstrated through factor analysis and the reliability was analyzed using Cronbach's alpha. Results: the committee of experts made the necessary adjustments so that the scale was adapted to the Brazilian context. The factor analysis suggested a reduction from seven to five factors and the maintenance of 38 items similar to those of the original scale. The reliability, investigated through Cronbach's alpha, was .829, showing high internal consistency. Conclusion: it was concluded that the Brazilian version of the Adherence Determinants Questionnaire scale is a valid and reliable instrument that is able to measure the elements of adherence to the treatment for breast and cervical cancer. PMID:26487149
Availability Estimation for Facilities in Extreme Geographical Locations
NASA Technical Reports Server (NTRS)
Fischer, Gerd M.; Omotoso, Oluseun; Chen, Guangming; Evans, John W.
2012-01-01
A value added analysis for the Reliability. Availability and Maintainability of McMurdo Ground Station was developed, which will be a useful tool for system managers in sparing, maintenance planning and determining vital performance metrics needed for readiness assessment of the upgrades to the McMurdo System. Output of this study can also be used as inputs and recommendations for the application of Reliability Centered Maintenance (RCM) for the system. ReliaSoft's BlockSim. a commercial Reliability Analysis software package, has been used to model the availability of the system upgrade to the National Aeronautics and Space Administration (NASA) Near Earth Network (NEN) Ground Station at McMurdo Station in the Antarctica. The logistics challenges due to the closure of access to McMurdo Station during the Antarctic winter was modeled using a weighted composite of four Weibull distributions. one of the possible choices for statistical distributions throughout the software program and usually used to account for failure rates of components supplied by different manufacturers. The inaccessibility of the antenna site on a hill outside McMurdo Station throughout one year due to severe weather was modeled with a Weibull distribution for the repair crew availability. The Weibull distribution is based on an analysis of the available weather data for the antenna site for 2007 in combination with the rules for travel restrictions due to severe weather imposed by the administrating agency, the National Science Foundation (NSF). The simulations resulted in an upper bound for the system availability and allowed for identification of components that would improve availability based on a higher on-site spare count than initially planned.
SPOT4 Operational Control Center (CMP)
NASA Technical Reports Server (NTRS)
Zaouche, G.
1993-01-01
CNES(F) is responsible for the development of a new generation of Operational Control Center (CMP) which will operate the new heliosynchronous remote sensing satellite (SPOT4). This Operational Control Center takes large benefit from the experience of the first generation of control center and from the recent advances in computer technology and standards. The CMP is designed for operating two satellites all the same time with a reduced pool of controllers. The architecture of this CMP is simple, robust, and flexible, since it is based on powerful distributed workstations interconnected through an Ethernet LAN. The application software uses modern and formal software engineering methods, in order to improve quality and reliability, and facilitate maintenance. This software is table driven so it can be easily adapted to other operational needs. Operation tasks are automated to the maximum extent, so that it could be possible to operate the CMP automatically with very limited human interference for supervision and decision making. This paper provides an overview of the SPOTS mission and associated ground segment. It also details the CMP, its functions, and its software and hardware architecture.
ERIC Educational Resources Information Center
Migliorino, James
Boards of education must be convinced that spending money up front for preventive maintenance will, in the long run, save districts' tax dollars. A good program of preventive maintenance can minimize disruption of service; reduce repair costs, energy consumption, and overtime; improve labor productivity and system equipment reliability; handle…
Limitations of Reliability for Long-Endurance Human Spaceflight
NASA Technical Reports Server (NTRS)
Owens, Andrew C.; de Weck, Olivier L.
2016-01-01
Long-endurance human spaceflight - such as missions to Mars or its moons - will present a never-before-seen maintenance logistics challenge. Crews will be in space for longer and be farther way from Earth than ever before. Resupply and abort options will be heavily constrained, and will have timescales much longer than current and past experience. Spare parts and/or redundant systems will have to be included to reduce risk. However, the high cost of transportation means that this risk reduction must be achieved while also minimizing mass. The concept of increasing system and component reliability is commonly discussed as a means to reduce risk and mass by reducing the probability that components will fail during a mission. While increased reliability can reduce maintenance logistics mass requirements, the rate of mass reduction decreases over time. In addition, reliability growth requires increased test time and cost. This paper assesses trends in test time requirements, cost, and maintenance logistics mass savings as a function of increase in Mean Time Between Failures (MTBF) for some or all of the components in a system. In general, reliability growth results in superlinear growth in test time requirements, exponential growth in cost, and sublinear benefits (in terms of logistics mass saved). These trends indicate that it is unlikely that reliability growth alone will be a cost-effective approach to maintenance logistics mass reduction and risk mitigation for long-endurance missions. This paper discusses these trends as well as other options to reduce logistics mass such as direct reduction of part mass, commonality, or In-Space Manufacturing (ISM). Overall, it is likely that some combination of all available options - including reliability growth - will be required to reduce mass and mitigate risk for future deep space missions.
1986-02-01
ionospheric sensing 118 I device, provide more reliable comnunications, especially when HF propagation is uncertain, by determining which frequencies...the Fleet Numerical Oceanography Center computer systems. GDEM generates a sound velocity profile from the surface to the sea floor at every 1/2...degrees of lat/log for the Northern Hemisphere oceans. GDEM is a Navy standard data base for all acoustic models. 18) Software Improvement Plan (SIP) as 600
75 FR 71678 - Commission Information Collection Activities; Comment Request; Extension
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-24
... Maintenance Reliability Standards'' (OMB Control No. 1902-0247), is required to implement the statutory... Electric Reliability Organization (ERO) to develop mandatory and enforceable reliability standards, which are subject to Commission review and approval. Once approved, the reliability standards may be...
The roles of vibration analysis and infrared thermography in monitoring air-handling equipment
NASA Astrophysics Data System (ADS)
Wurzbach, Richard N.
2003-04-01
Industrial and commercial building equipment maintenance has not historically been targeted for implementation of PdM programs. The focus instead has been on manufacturing, aerospace and energy industries where production interruption has significant cost implications. As cost-effectiveness becomes more pervasive in corporate culture, even office space and labor activities housed in large facilities are being scrutinized for cost-cutting measures. When the maintenance costs for these facilities are reviewed, PdM can be considered for improving the reliability of the building temperature regulation, and reduction of maintenance repair costs. An optimized program to direct maintenance resources toward a cost effective and pro-active management of the facility can result in reduced operating budgets, and greater occupant satisfaction. A large majority of the significant rotating machinery in a large building environment are belt-driven air handling units. These machines are often poorly designed or utilized within the facility. As a result, the maintenance staff typically find themselves scrambling to replace belts and bearings, going from one failure to another. Instead of the reactive-mode maintenance, some progressive and critical institutions are adopting predictive and proactive technologies of infrared thermography and vibration analysis. Together, these technologies can be used to identify design and installation problems, that when corrected, significantly reduce maintenance and increase reliability. For critical building use, such as laboratories, research facilities, and other high value non-industrial settings, the cost-benefits of more reliable machinery can contribute significantly to the operational success.
Artificial intelligence for turboprop engine maintenance
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-01-01
Long-term maintenance operations, causing the unit to out of action, may seem economical - but they result in reduced operating readiness. Offsetting that concern, careless, hurried maintenance reduces margins of safety and reliability. Any tool that improves maintenance without causing a sharp increase in cost is valuable. Artificial intelligence (AI) is one of the tools. Expert system and neural networks are two different areas of AI that show promise for turboprop engine maintenance.
Ultra Reliable Closed Loop Life Support for Long Space Missions
NASA Technical Reports Server (NTRS)
Jones, Harry W.; Ewert, Michael K.
2010-01-01
Spacecraft human life support systems can achieve ultra reliability by providing sufficient spares to replace all failed components. The additional mass of spares for ultra reliability is approximately equal to the original system mass, provided that the original system reliability is not too low. Acceptable reliability can be achieved for the Space Shuttle and Space Station by preventive maintenance and by replacing failed units. However, on-demand maintenance and repair requires a logistics supply chain in place to provide the needed spares. In contrast, a Mars or other long space mission must take along all the needed spares, since resupply is not possible. Long missions must achieve ultra reliability, a very low failure rate per hour, since they will take years rather than weeks and cannot be cut short if a failure occurs. Also, distant missions have a much higher mass launch cost per kilogram than near-Earth missions. Achieving ultra reliable spacecraft life support systems with acceptable mass will require a well-planned and extensive development effort. Analysis must determine the reliability requirement and allocate it to subsystems and components. Ultra reliability requires reducing the intrinsic failure causes, providing spares to replace failed components and having "graceful" failure modes. Technologies, components, and materials must be selected and designed for high reliability. Long duration testing is needed to confirm very low failure rates. Systems design should segregate the failure causes in the smallest, most easily replaceable parts. The system must be designed, developed, integrated, and tested with system reliability in mind. Maintenance and reparability of failed units must not add to the probability of failure. The overall system must be tested sufficiently to identify any design errors. A program to develop ultra reliable space life support systems with acceptable mass should start soon since it must be a long term effort.
14 CFR 171.153 - Requests for IFR procedure.
Code of Federal Regulations, 2010 CFR
2010-01-01
... and maintenance manual that meets the requirement of § 171.161. (4) A statement of intention to meet... operational reliability and an acceptable standard of performance. Previous equivalent operational experience... maintenance manual or maintenance organization. The owner must then correct the deficiencies, if any, and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-28
... Maintenance; Protection and Control; and Voltage and Reactive AGENCY: Federal Energy Regulatory Commission..., Connections, and Maintenance; Protection and Control; and Voltage and Reactive, Notice of Proposed Rulemaking... regional definitions for Functionally Equivalent Protection System, Functionally Equivalent Remedial Action...
Developing Ultra Reliable Life Support for the Moon and Mars
NASA Technical Reports Server (NTRS)
Jones, Harry W.
2009-01-01
Recycling life support systems can achieve ultra reliability by using spares to replace failed components. The added mass for spares is approximately equal to the original system mass, provided the original system reliability is not very low. Acceptable reliability can be achieved for the space shuttle and space station by preventive maintenance and by replacing failed units, However, this maintenance and repair depends on a logistics supply chain that provides the needed spares. The Mars mission must take all the needed spares at launch. The Mars mission also must achieve ultra reliability, a very low failure rate per hour, since it requires years rather than weeks and cannot be cut short if a failure occurs. Also, the Mars mission has a much higher mass launch cost per kilogram than shuttle or station. Achieving ultra reliable space life support with acceptable mass will require a well-planned and extensive development effort. Analysis must define the reliability requirement and allocate it to subsystems and components. Technologies, components, and materials must be designed and selected for high reliability. Extensive testing is needed to ascertain very low failure rates. Systems design should segregate the failure causes in the smallest, most easily replaceable parts. The systems must be designed, produced, integrated, and tested without impairing system reliability. Maintenance and failed unit replacement should not introduce any additional probability of failure. The overall system must be tested sufficiently to identify any design errors. A program to develop ultra reliable space life support systems with acceptable mass must start soon if it is to produce timely results for the moon and Mars.
Software for marine ecological environment comprehensive monitoring system based on MCGS
NASA Astrophysics Data System (ADS)
Wang, X. H.; Ma, R.; Cao, X.; Cao, L.; Chu, D. Z.; Zhang, L.; Zhang, T. P.
2017-08-01
The automatic integrated monitoring software for marine ecological environment based on MCGS configuration software is designed and developed to realize real-time automatic monitoring of many marine ecological parameters. The DTU data transmission terminal performs network communication and transmits the data to the user data center in a timely manner. The software adopts the modular design and has the advantages of stable and flexible data structure, strong portability and scalability, clear interface, simple user operation and convenient maintenance. Continuous site comparison test of 6 months showed that, the relative error of the parameters monitored by the system such as temperature, salinity, turbidity, pH, dissolved oxygen was controlled within 5% with the standard method and the relative error of the nutrient parameters was within 15%. Meanwhile, the system had few maintenance times, low failure rate, stable and efficient continuous monitoring capabilities. The field application shows that the software is stable and the data communication is reliable, and it has a good application prospect in the field of marine ecological environment comprehensive monitoring.
2013-10-21
depend on the quality of allocating resources. This work uses a reliability model of system and environmental covariates incorporating information at...state space. Further, the use of condition variables allows for the direct modeling of maintenance impact with the assumption that a nominal value ... value ), the model in the application of aviation maintenance can provide a useful estimation of reliability at multiple levels. Adjusted survival
NASA Technical Reports Server (NTRS)
Eichenberg, Dennis J.
2009-01-01
The NASA Glenn Research Center (GRC) has developed, installed, and tested a 12 kW DC grid-tied photovoltaic (PV) power system at the GRC Visitor s Center. This system utilizes a unique ballast type roof mount for installing the photovoltaic panels on the roof of the Visitor s Center with no alterations or penetrations to the roof. The PV system has generated in excess of 15000 kWh since operation commenced in August 2008. The PV system is providing power to the GRC grid for use by all. Operation of the GRC Visitor s Center PV system has been completely trouble free. A grid-tied PV power system is connected directly to the utility distribution grid. Facility power can be obtained from the utility system as normal. The PV system is synchronized with the utility system to provide power for the facility, and excess power is provided to the utility. The project transfers space technology to terrestrial use via nontraditional partners. GRC personnel glean valuable experience with PV power systems that are directly applicable to various space power systems, and provides valuable space program test data. PV power systems help to reduce harmful emissions and reduce the Nation s dependence on fossil fuels. Power generated by the PV system reduces the GRC utility demand, and the surplus power aids the community. Present global energy concerns reinforce the need for the development of alternative energy systems. Modern PV panels are readily available, reliable, efficient, and economical with a life expectancy of at least 25 years. Modern electronics has been the enabling technology behind grid-tied power systems, making them safe, reliable, efficient, and economical with a life expectancy of at least 25 years. Based upon the success of the GRC Visitor s Center PV system, additional PV power system expansion at GRC is under consideration. The GRC Visitor s Center grid-tied PV power system was successfully designed and developed which served to validate the basic principles described, and the theoretical work that was performed. The report concludes that grid-tied photovoltaic power systems are reliable, maintenance free, long life power systems, and are of significant value to NASA and the community.
A probabilistic maintenance model for diesel engines
NASA Astrophysics Data System (ADS)
Pathirana, Shan; Abeygunawardane, Saranga Kumudu
2018-02-01
In this paper, a probabilistic maintenance model is developed for inspection based preventive maintenance of diesel engines based on the practical model concepts discussed in the literature. Developed model is solved using real data obtained from inspection and maintenance histories of diesel engines and experts' views. Reliability indices and costs were calculated for the present maintenance policy of diesel engines. A sensitivity analysis is conducted to observe the effect of inspection based preventive maintenance on the life cycle cost of diesel engines.
Reliability based fatigue design and maintenance procedures
NASA Technical Reports Server (NTRS)
Hanagud, S.
1977-01-01
A stochastic model has been developed to describe a probability for fatigue process by assuming a varying hazard rate. This stochastic model can be used to obtain the desired probability of a crack of certain length at a given location after a certain number of cycles or time. Quantitative estimation of the developed model was also discussed. Application of the model to develop a procedure for reliability-based cost-effective fail-safe structural design is presented. This design procedure includes the reliability improvement due to inspection and repair. Methods of obtaining optimum inspection and maintenance schemes are treated.
Waste Processing Research and Technology Development at NASA Ames Research Center
NASA Technical Reports Server (NTRS)
Fisher, John; Kliss, Mark
2004-01-01
The current "store and return" approach for handling waste products generated during low Earth orbit missions will not meet the requirements for future human missions identified in NASA s new Exploration vision. The objective is to develop appropriate reliable waste management systems that minimize maintenance and crew time, while maintaining crew health and safety, as well as providing protection of planetary surfaces. Solid waste management requirements for these missions include waste volume reduction, stabilization and storage, water recovery, and ultimately recovery of carbon dioxide, nutrients and other resources from a fully regenerative food production life support system. This paper identifies the key drivers for waste management technology development within NASA, and provides a roadmap for the developmental sequence and progression of technologies. Recent results of research and technology development activities at NASA Ames Research Center on candidate waste management technologies with emphasis on compaction, lyophilization, and incineration are discussed.
density and reliability while reducing operations and maintenance and deployment costs. Prior to joining condition monitoring systems for Army rotorcraft to reduce the cost and maintenance burdens while increasing
14 CFR 171.305 - Requests for IFR procedure.
Code of Federal Regulations, 2010 CFR
2010-01-01
... maintenance manual that meets the requirements of § 171.325. (4) A statement of intent to meet the... reliability and an acceptable standard of performance. Previous equivalent operational experience with a... results, and of any required changes in the MLS facility or in the maintenance manual or maintenance...
10 CFR 712.38 - Maintenance of medical records.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Maintenance of medical records. 712.38 Section 712.38 Energy DEPARTMENT OF ENERGY HUMAN RELIABILITY PROGRAM Medical Standards § 712.38 Maintenance of medical... medical record. The psychological record must: (1) Contain any clinical reports, test protocols and data...
10 CFR 712.38 - Maintenance of medical records.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false Maintenance of medical records. 712.38 Section 712.38 Energy DEPARTMENT OF ENERGY HUMAN RELIABILITY PROGRAM Medical Standards § 712.38 Maintenance of medical records. (a) The medical records of HRP candidates and HRP-certified individuals must be maintained in...
10 CFR 712.38 - Maintenance of medical records.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false Maintenance of medical records. 712.38 Section 712.38 Energy DEPARTMENT OF ENERGY HUMAN RELIABILITY PROGRAM Medical Standards § 712.38 Maintenance of medical records. (a) The medical records of HRP candidates and HRP-certified individuals must be maintained in...
2009-01-01
activities within the patrol area. Maintenance of the Minuteman III weapon system requires maintenance and security teams travel to one or more of 150...launch facilities, all of which are geograph- ically isolated from major population centers. Travel time from F. E. Warren AFB, the main support base...the F. E. Warren AFB work center to make travel preparations, and ends after all maintenance actions are completed, or once the team arrives at one
Reliability Considerations for the Operation of Large Accelerator User Facilities
Willeke, F. J.
2016-01-29
The lecture provides an overview of considerations relevant for achieving highly reliable operation of accelerator based user facilities. The article starts with an overview of statistical reliability formalism which is followed by high reliability design considerations with examples. Finally, the article closes with operational aspects of high reliability such as preventive maintenance and spares inventory.
Development of a generic GMCC simulator.
DOT National Transportation Integrated Search
2001-11-01
This document describes the development and current status of a high fidelity, human-in-the-loop simulator for Airway Facilities : Maintenance Control Centers and Operations Control Centers. Applications include Event Manager, Maintenance Automation ...
NASA Astrophysics Data System (ADS)
Pattabhiraman, Sriram
Airplane fuselage structures are designed with the concept of damage tolerance, wherein small damage are allowed to remain on the airplane, and damage that otherwise affect the safety of the structure are repaired. The damage critical to the safety of the fuselage are repaired by scheduling maintenance at pre-determined intervals. Scheduling maintenance is an interesting trade-off between damage tolerance and cost. Tolerance of larger damage would require less frequent maintenance and hence, a lower cost, to maintain a certain level of reliability. Alternatively, condition-based maintenance techniques have been developed using on-board sensors, which track damage continuously and request maintenance only when the damage size crosses a particular threshold. This effects a tolerance of larger damage than scheduled maintenance, leading to savings in cost. This work quantifies the savings of condition-based maintenance over scheduled maintenance. The work also quantifies converting the cost savings into weight savings. Structural health monitoring will need time to be able to establish itself as a stand-alone system for maintenance, due to concerns on its diagnosis accuracy and reliability. This work also investigates the effect of synchronizing structural health monitoring system with scheduled maintenance. This work uses on-board SHM equipment skip structural airframe maintenance (a subsect of scheduled maintenance), whenever deemed unnecessary while maintain a desired level of safety of structure. The work will also predict the necessary maintenance for a fleet of airplanes, based on the current damage status of the airplanes. The work also analyses the possibility of false alarm, wherein maintenance is being requested with no critical damage on the airplane. The work use SHM as a tool to identify lemons in a fleet of airplanes. Lemons are those airplanes that would warrant more maintenance trips than the average behavior of the fleet.
Yoon, Jae-Ho; Kim, Hee-Je; Kwak, Dae-Hun; Park, Sung-Soo; Jeon, Young-Woo; Lee, Sung-Eun; Cho, Byung-Sik; Eom, Ki-Seong; Kim, Yoo-Jin; Lee, Seok; Min, Chang-Ki; Cho, Seok-Goo; Kim, Dong-Wook; Lee, Jong Wook; Min, Woo-Sung
2017-01-23
Wilms' tumor gene 1 (WT1) expression is a well-known predictor for relapse in acute myeloid leukemia. We monitored WT1 decrement along the treatment course to identify its significant role as a marker for residual disease in acute promyelocytic leukemia (APL) and tried to suggest its significance for relapse prediction. In this single center retrospective study, we serially measured PML-RARa and WT1 expression from 117 APL patients at diagnosis, at post-induction and post-consolidation chemotherapies, and at every 3 months after starting maintenance therapy. All 117 patients were in molecular remission after treatment of at least 2 consolidation chemotherapies. We used WT1 ProfileQuant™ kit (Ipsogen) for WT1 monitoring. High WT1 expression (>120 copies/10 4 ABL1) after consolidation and at early period (3 months) after maintenance therapy significantly predicted subsequent relapse. All paired PML-RARa RQ-PCR were not detected except for one sample with early relapse. Patients with high WT1 expression at 3 months after maintenance therapy (n = 40) showed a significantly higher relapse rate (30.5 vs. 6.9%, P < 0.001) and inferior disease free survival (62.8 vs. 91.4%, P < 0.001). Multivariate analysis revealed that high peak leukocyte counts at diagnosis (HR = 6.4, P < 0.001) and high WT1 expression at 3 months after maintenance therapy (HR = 7.1, P < 0.001) were significant factors for prediction of relapse. Our data showed high post-remission WT1 expression was a reliable marker for prediction of subsequent molecular relapse in APL. In this high-risk group, early intervention with ATRA ± ATO, anti-CD33 antibody therapy, and WT1-specific therapy may be used for relapse prevention. Clinical Research Information Service (CRIS), KCT0002079.
NASA Astrophysics Data System (ADS)
Varlataya, S. K.; Evdokimov, V. E.; Urzov, A. Y.
2017-11-01
This article describes a process of calculating a certain complex information security system (CISS) reliability using the example of the technospheric security management model as well as ability to determine the frequency of its maintenance using the system reliability parameter which allows one to assess man-made risks and to forecast natural and man-made emergencies. The relevance of this article is explained by the fact the CISS reliability is closely related to information security (IS) risks. Since reliability (or resiliency) is a probabilistic characteristic of the system showing the possibility of its failure (and as a consequence - threats to the protected information assets emergence), it is seen as a component of the overall IS risk in the system. As it is known, there is a certain acceptable level of IS risk assigned by experts for a particular information system; in case of reliability being a risk-forming factor maintaining an acceptable risk level should be carried out by the routine analysis of the condition of CISS and its elements and their timely service. The article presents a reliability parameter calculation for the CISS with a mixed type of element connection, a formula of the dynamics of such system reliability is written. The chart of CISS reliability change is a S-shaped curve which can be divided into 3 periods: almost invariable high level of reliability, uniform reliability reduction, almost invariable low level of reliability. Setting the minimum acceptable level of reliability, the graph (or formula) can be used to determine the period of time during which the system would meet requirements. Ideally, this period should not be longer than the first period of the graph. Thus, the proposed method of calculating the CISS maintenance frequency helps to solve a voluminous and critical task of the information assets risk management.
1980-01-01
specified condition. 10. Mean-Time-Between-Maintenance ( MTDM ). The mean of the distribution of the time intervals between all maintenance actions...which requires unscheduled maint. action. 3. MTDM : Mean-Time-Between-Maintenance. 4. W4I/OH: Maint Man-Hour/Engine Opbrating Hour S. CLASS III FAIURE
The NASA Langley Research Center 0.3-meter transonic cryogenic tunnel T-P/Re-M controller manual
NASA Technical Reports Server (NTRS)
Balakrishna, S.; Kilgore, W. Allen
1989-01-01
A new microcomputer based controller for the 0.3-m Transonic Cryogenic Tunnel (TCT) has been commissioned in 1988 and has reliably operated for more than a year. The tunnel stagnation pressure, gas stagnation temperature, tunnel wall structural temperature and flow Mach number are precisely controlled by the new controller in a stable manner. The tunnel control hardware, software, and the flow chart to assist in calibration of the sensors, actuators, and the controller real time functions are described. The software installation details are also presented. The report serves as the maintenance and trouble shooting manual for the 0.3-m TCT controller.
COSMIC monthly progress report
NASA Technical Reports Server (NTRS)
1994-01-01
Activities of the Computer Software Management and Information Center (COSMIC) are summarized for the month of April 1994. Tables showing the current inventory of programs available from COSMIC are presented and program processing and evaluation activities are summarized. Five articles were prepared for publication in the NASA Tech Brief Journal. These articles (included in this report) describe the following software items: GAP 1.0 - Groove Analysis Program, Version 1.0; SUBTRANS - Subband/Transform MATLAB Functions for Image Processing; CSDM - COLD-SAT Dynamic Model; CASRE - Computer Aided Software Reliability Estimation; and XOPPS - OEL Project Planner/Scheduler Tool. Activities in the areas of marketing, customer service, benefits identification, maintenance and support, and disseminations are also described along with a budget summary.
NASA Technical Reports Server (NTRS)
Sydnor, Goerge H.
2010-01-01
The National Aeronautics and Space Administration's (NASA) Aeronautics Test Program (ATP) is implementing five significant ground-based test facility projects across the nation with funding provided by the American Recovery and Reinvestment Act (ARRA). The projects were selected as the best candidates within the constraints of the ARRA and the strategic plan of ATP. They are a combination of much-needed large scale maintenance, reliability, and system upgrades plus creating new test beds for upcoming research programs. The projects are: 1.) Re-activation of a large compressor to provide a second source for compressed air and vacuum to the Unitary Plan Wind Tunnel at the Ames Research Center (ARC) 2.) Addition of high-altitude ice crystal generation at the Glenn Research Center Propulsion Systems Laboratory Test Cell 3, 3.) New refrigeration system and tunnel heat exchanger for the Icing Research Tunnel at the Glenn Research Center, 4.) Technical viability improvements for the National Transonic Facility at the Langley Research Center, and 5.) Modifications to conduct Environmentally Responsible Aviation and Rotorcraft research at the 14 x 22 Subsonic Tunnel at Langley Research Center. The selection rationale, problem statement, and technical solution summary for each project is given here. The benefits and challenges of the ARRA funded projects are discussed. Indirectly, this opportunity provides the advantages of developing experience in NASA's workforce in large projects and maintaining corporate knowledge in that very unique capability. It is envisioned that improved facilities will attract a larger user base and capabilities that are needed for current and future research efforts will offer revenue growth and future operations stability. Several of the chosen projects will maximize wind tunnel reliability and maintainability by using newer, proven technologies in place of older and obsolete equipment and processes. The projects will meet NASA's goal of integrating more efficient, environmentally safer, and less energy consuming hardware and processes into existing tunnel systems. These include Environmental Protection Agency-approved refrigerants, energy efficient motors, and faster, flexible tunnel data systems.
Bearing Procurement Analysis Method by Total Cost of Ownership Analysis and Reliability Prediction
NASA Astrophysics Data System (ADS)
Trusaji, Wildan; Akbar, Muhammad; Sukoyo; Irianto, Dradjad
2018-03-01
In making bearing procurement analysis, price and its reliability must be considered as decision criteria, since price determines the direct cost as acquisition cost and reliability of bearing determine the indirect cost such as maintenance cost. Despite the indirect cost is hard to identify and measured, it has high contribution to overall cost that will be incurred. So, the indirect cost of reliability must be considered when making bearing procurement analysis. This paper tries to explain bearing evaluation method with the total cost of ownership analysis to consider price and maintenance cost as decision criteria. Furthermore, since there is a lack of failure data when bearing evaluation phase is conducted, reliability prediction method is used to predict bearing reliability from its dynamic load rating parameter. With this method, bearing with a higher price but has higher reliability is preferable for long-term planning. But for short-term planning the cheaper one but has lower reliability is preferable. This contextuality can give rise to conflict between stakeholders. Thus, the planning horizon needs to be agreed by all stakeholder before making a procurement decision.
Sensitivity Study for Long Term Reliability
NASA Technical Reports Server (NTRS)
White, Allan L.
2008-01-01
This paper illustrates using Markov models to establish system and maintenance requirements for small electronic controllers where the goal is a high probability of continuous service for a long period of time. The system and maintenance items considered are quality of components, various degrees of simple redundancy, redundancy with reconfiguration, diagnostic levels, periodic maintenance, and preventive maintenance. Markov models permit a quantitative investigation with comparison and contrast. An element of special interest is the use of conditional probability to study the combination of imperfect diagnostics and periodic maintenance.
Sjekavica, Mariela; Haller, Herman; Cerić, Anita
2015-01-01
Building usage is the phase in the building life cycle that is most time-consuming, most functional, most significant due to building purpose and often systematically ignored. Maintenance is the set of activities that ensure the planned duration of facility exploitation phase in accordance with the requirements for quality maintenance of a large number of important building features as well as other elements immanent to the nature of facilities' life. The aim of the study is to show the analysis of the current state of organized, planned and comprehensive managerial approach in hospital utilization and maintenance in the Republic of Croatia, given on the case study of Clinical hospital center in Rijeka. The methodology used consists of relevant literature section of theory of facility utilization, maintenance and management in general, hospital buildings especially, display of practice on case study, and comparison of key performance indicators values obtained through interview with those that author Igal M. Shohet defined in his study by field surveys and statistical analyses. Despite many positive indicators of Clinical hospital center Rijeka maintenance, an additional research is needed in order to define a more complete national hospital maintenance strategy.
Maintenance-free lead acid battery for inertial navigation systems aircraft
NASA Astrophysics Data System (ADS)
Johnson, William R.; Vutetakis, David G.
1995-05-01
Historically, Aircraft Inertial Navigation System (INS) Batteries have utilized vented nickel-cadmium batteries for emergency DC power. The United States Navy and Air Force developed separate systems during their respective INS developments. The Navy contracted with Litton Industries to produce the LTN-72 and Air Force contracted with Delco to produce the Carousel IV INS for the large cargo and specialty aircraft applications. Over the years, a total of eight different battery national stock numbers (NSNs) have entered the stock system along with 75 battery spare part NSNs. The Standard Hardware Acquisition and Reliability Program is working with the Aircraft Battery Group at Naval Surface Warfare Center Crane Division, Naval Air Systems Command (AIR 536), Wright Laboratory, Battelle Memorial Institute, and Concorde Battery Corporation to produce a standard INS battery. This paper discusses the approach taken to determine whether the battery should be replaced and to select the replacement chemistry. The paper also discusses the battery requirements, aircraft that the battery is compatible with, and status of Navy flight evaluation. Projected savings in avoided maintenance in Navy and Air Force INS Systems is projected to be $14.7 million per year with a manpower reduction of 153 maintenance personnel. The new INS battery is compatible with commercially sold INS systems which represents 66 percent of the systems sold.
NASA Astrophysics Data System (ADS)
Xie, Chang; Wen, Jing; Liu, Wenying; Wang, Jiaming
With the development of intelligent dispatching, the intelligence level of network control center full-service urgent need to raise. As an important daily work of network control center, the application of maintenance scheduling intelligent arrangement to achieve high-quality and safety operation of power grid is very important. By analyzing the shortages of the traditional maintenance scheduling software, this paper designs a power grid maintenance scheduling intelligence arrangement supporting system based on power flow forecasting, which uses the advanced technologies in maintenance scheduling, such as artificial intelligence, online security checking, intelligent visualization techniques. It implements the online security checking of maintenance scheduling based on power flow forecasting and power flow adjusting based on visualization, in order to make the maintenance scheduling arrangement moreintelligent and visual.
NASA Astrophysics Data System (ADS)
Ighravwe, D. E.; Oke, S. A.; Adebiyi, K. A.
2016-06-01
The growing interest in technicians' workloads research is probably associated with the recent surge in competition. This was prompted by unprecedented technological development that triggers changes in customer tastes and preferences for industrial goods. In a quest for business improvement, this worldwide intense competition in industries has stimulated theories and practical frameworks that seek to optimise performance in workplaces. In line with this drive, the present paper proposes an optimisation model which considers technicians' reliability that complements factory information obtained. The information used emerged from technicians' productivity and earned-values using the concept of multi-objective modelling approach. Since technicians are expected to carry out routine and stochastic maintenance work, we consider these workloads as constraints. The influence of training, fatigue and experiential knowledge of technicians on workload management was considered. These workloads were combined with maintenance policy in optimising reliability, productivity and earned-values using the goal programming approach. Practical datasets were utilised in studying the applicability of the proposed model in practice. It was observed that our model was able to generate information that practicing maintenance engineers can apply in making more informed decisions on technicians' management.
A quick and reliable procedure for assessing foot alignment in athletes.
De Michelis Mendonça, Luciana; Bittencourt, Natália Franco Netto; Amaral, Giovanna Mendes; Diniz, Lívia Santos; Souza, Thales Rezende; da Fonseca, Sérgio Teixeira
2013-01-01
Quick procedures with proper psychometric properties that can capture the combined alignment of the foot-ankle complex in a position that may be more representative of the status of the lower limb during ground contact are essential for assessing a large group of athletes. The assessed lower limb was positioned with the calcaneus surface facing upward in a way that all of the marks could be seen at the center of the camera display. After guaranteeing maintenance of the foot at 90° of dorsiflexion actively sustained by the athlete, the examiner took the picture of the foot-ankle alignment. Intraclass correlation coefficients ranging from 0.82 to 0.93 demonstrated excellent intratester and intertester reliability for the proposed measurements of forefoot, rearfoot, and shank-forefoot alignments. The intraclass correlation coefficient between the shank-forefoot measures and the sum of the rearfoot and forefoot measures was 0.98, suggesting that the shank-forefoot alignment measures can represent the combined rearfoot and forefoot alignments. This study describes a reliable and practical measurement procedure for rearfoot, forefoot, and shank-forefoot alignments that can be applied to clinical and research situations as a screening procedure for risk factors for lower-limb injuries in athletes.
Companies Selected for Small Wind Turbine Project
) 972-9246 Golden, Colo., Nov. 27, 1996 -- In an effort to develop cost-effective, low-maintenance wind have to perform effectively and reliably over a long period of time without maintenance. The companies
NASA Astrophysics Data System (ADS)
Nagata, Takeshi; Tao, Yasuhiro; Utatani, Masahiro; Sasaki, Hiroshi; Fujita, Hideki
This paper proposes a multi-agent approach to maintenance scheduling in restructured power systems. The restructuring of electric power industry has resulted in market-based approaches for unbundling a multitude of service provided by self-interested entities such as power generating companies (GENCOs), transmission providers (TRANSCOs) and distribution companies (DISCOs). The Independent System Operator (ISO) is responsible for the security of the system operation. The schedule submitted to ISO by GENCOs and TRANSCOs should satisfy security and reliability constraints. The proposed method consists of several GENCO Agents (GAGs), TARNSCO Agents (TAGs) and a ISO Agent(IAG). The IAG’s role in maintenance scheduling is limited to ensuring that the submitted schedules do not cause transmission congestion or endanger the system reliability. From the simulation results, it can be seen the proposed multi-agent approach could coordinate between generation and transmission maintenance schedules.
42 CFR 493.1254 - Standard: Maintenance and function checks.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ensures equipment, instrument, and test system performance that is necessary for accurate and reliable... equipment, instrument, and test system performance that is necessary for accurate and reliable test results...
General aviation avionics equipment maintenance
NASA Technical Reports Server (NTRS)
Parker, C. D.; Tommerdahl, J. B.
1978-01-01
Maintenance of general aviation avionics equipment was investigated with emphasis on single engine and light twin engine general aviation aircraft. Factors considered include the regulatory agencies, avionics manufacturers, avionics repair stations, the statistical character of the general aviation community, and owners and operators. The maintenance, environment, and performance, repair costs, and reliability of avionics were defined. It is concluded that a significant economic stratification is reflected in the maintenance problems encountered, that careful attention to installations and use practices can have a very positive impact on maintenance problems, and that new technologies and a general growth in general aviation will impact maintenance.
Identification of the human factors contributing to maintenance failures in a petroleum operation.
Antonovsky, Ari; Pollock, Clare; Straker, Leon
2014-03-01
This research aimed to identify the most frequently occurring human factors contributing to maintenance-related failures within a petroleum industry organization. Commonality between failures will assist in understanding reliability in maintenance processes, thereby preventing accidents in high-hazard domains. Methods exist for understanding the human factors contributing to accidents. Their application in a maintenance context mainly has been advanced in aviation and nuclear power. Maintenance in the petroleum industry provides a different context for investigating the role that human factors play in influencing outcomes. It is therefore worth investigating the contributing human factors to improve our understanding of both human factors in reliability and the factors specific to this domain. Detailed analyses were conducted of maintenance-related failures (N = 38) in a petroleum company using structured interviews with maintenance technicians. The interview structure was based on the Human Factor Investigation Tool (HFIT), which in turn was based on Rasmussen's model of human malfunction. A mean of 9.5 factors per incident was identified across the cases investigated.The three most frequent human factors contributing to the maintenance failures were found to be assumption (79% of cases), design and maintenance (71%), and communication (66%). HFIT proved to be a useful instrument for identifying the pattern of human factors that recurred most frequently in maintenance-related failures. The high frequency of failures attributed to assumptions and communication demonstrated the importance of problem-solving abilities and organizational communication in a domain where maintenance personnel have a high degree of autonomy and a wide geographical distribution.
2011-02-08
CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center in Florida hosts a ribbon-cutting ceremony at a new 18,500-square-foot Electrical Maintenance Facility (EMF) officially opening for business. Addressing the attendees is Kennedy Center Director Bob Cabana. Located in Kennedy's Launch Complex 39 area, the EMF will provide new and renovated space for maintenance shops, offices, and equipment and material storage in support of the electrical maintenance functions for the center. The facility is projected to receive Gold certification under the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) rating system. Photo credit: NASA/ Troy Cryder
Facilities maintenance handbook
NASA Technical Reports Server (NTRS)
1991-01-01
This handbook is a guide for facilities maintenance managers. Its objective is to set minimum facilities maintenance standards. It also provides recommendations on how to meet the standards to ensure that NASA maintains its facilities in a manner that protects and preserves its investment in the facilities in a cost-effective manner while safely and efficiently performing its mission. This handbook implements NMI 8831.1, which states NASA facilities maintenance policy and assigns organizational responsibilities for the management of facilities maintenance activities on all properties under NASA jurisdiction. It is a reference for facilities maintenance managers, not a step-by-step procedural manual. Because of the differences in NASA Field Installation organizations, this handbook does not assume or recommend a typical facilities maintenance organization. Instead, it uses a systems approach to describe the functions that should be included in any facilities maintenance management system, regardless of its organizational structure. For documents referenced in the handbook, the most recent version of the documents is applicable. This handbook is divided into three parts: Part 1 specifies common definitions and facilities maintenance requirements and amplifies the policy requirements contained in NMI 8831. 1; Part 2 provides guidance on how to meet the requirements of Part 1, containing recommendations only; Part 3 contains general facilities maintenance information. One objective of this handbook is to fix commonality of facilities maintenance definitions among the Centers. This will permit the application of uniform measures of facilities conditions, of the relationship between current replacement value and maintenance resources required, and of the backlog of deferred facilities maintenance. The utilization of facilities maintenance system functions will allow the Centers to quantitatively define maintenance objectives in common terms, prepare work plans, and develop management information in order to statistically identify and analyze variances from those plans. It will also add credibility to the NASA facilities maintenance budgeting process. The key to a successful maintenance program is the understanding and support of the senior Center managers.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
... by the FERC-725D, ``Facilities Design, Connections and Maintenance Reliability Standards'' (OMB... 2005 added a new section 215 to the FPA, which required a Commission-certified Electric Reliability Organization (ERO) to develop mandatory and enforceable reliability standards, which are subject to Commission...
Development and Testing of an Ultracapacitor Based Uninterruptible Power Supply (UPS) System
NASA Technical Reports Server (NTRS)
Eichenberg, Dennis J.
2010-01-01
The NASA Glenn Research Center (GRC) initiated the development and testing of an ultracapacitor based uninterruptible power supply (UPS) system as a means to provide backup power for the many critical NASA applications. A UPS system typically utilizes batteries for energy storage. The battery is the most vulnerable part of the UPS system, requiring regular maintenance and replacement. Battery performance is also extremely temperature dependent. Ultracapacitors are ideal for UPS systems where long life, maintenance free operation, and excellent low temperature performance is essential. State of the art symmetric ultracapacitors were used for these tests. The ultracapacitors were interconnected in an innovative configuration to minimize interconnection impedance, and to provide voltage balancing. Ultracapacitors can be charged extremely rapidly and supply high current, which are essential characteristics for an effective UPS system. Charging ultracapacitors is significantly less complex than charging batteries since there is no chemical reaction occurring while charging ultracapacitors. The report concludes that the implementation of symmetric ultracapacitors in a UPS system can provide significant improvements in power system performance and reliability.
Computer Maintenance Operations Center (CMOC), additional computer support equipment ...
Computer Maintenance Operations Center (CMOC), additional computer support equipment - Beale Air Force Base, Perimeter Acquisition Vehicle Entry Phased-Array Warning System, Techinical Equipment Building, End of Spencer Paul Road, north of Warren Shingle Road (14th Street), Marysville, Yuba County, CA
Reliability and Availability Evaluation Program Manual.
1982-11-01
research and development. The manual’s purpose was to provide a practical method for making reliability measurements, measurements directly related to... Research , Development, Test and Evaluation. RMA Reliability, Maintainability and Availability. R&R Repair and Refurbishment, Repair and Replacement, etc...length. phenomena such as mechanical wear and A number of researchers in the reliability chemical deterioration. Maintenance should field 14-pages 402
NASA Astrophysics Data System (ADS)
Moghaddam, Kamran S.; Usher, John S.
2011-07-01
In this article, a new multi-objective optimization model is developed to determine the optimal preventive maintenance and replacement schedules in a repairable and maintainable multi-component system. In this model, the planning horizon is divided into discrete and equally-sized periods in which three possible actions must be planned for each component, namely maintenance, replacement, or do nothing. The objective is to determine a plan of actions for each component in the system while minimizing the total cost and maximizing overall system reliability simultaneously over the planning horizon. Because of the complexity, combinatorial and highly nonlinear structure of the mathematical model, two metaheuristic solution methods, generational genetic algorithm, and a simulated annealing are applied to tackle the problem. The Pareto optimal solutions that provide good tradeoffs between the total cost and the overall reliability of the system can be obtained by the solution approach. Such a modeling approach should be useful for maintenance planners and engineers tasked with the problem of developing recommended maintenance plans for complex systems of components.
Computer Maintenance Operations Center (CMOC), showing duplexed cyber 170174 computers ...
Computer Maintenance Operations Center (CMOC), showing duplexed cyber 170-174 computers - Beale Air Force Base, Perimeter Acquisition Vehicle Entry Phased-Array Warning System, Techinical Equipment Building, End of Spencer Paul Road, north of Warren Shingle Road (14th Street), Marysville, Yuba County, CA
The NASA-Lewis/ERDA Solar Heating and Cooling Technology Program
NASA Technical Reports Server (NTRS)
Couch, J. P.; Bloomfield, H. S.
1975-01-01
The NASA Lewis Research Center plans to carry out a major role in the ERDA Solar Heating and Cooling Program. This role would be to create and test the enabling technology for future solar heating, cooling, and combined heating/cooling systems. The major objectives of the project are to achieve reduction in solar energy system costs, while maintaining adequate performance, reliability, life, and maintenance characteristics. The project approach is to move progressively through component, subsystem, and then system technology advancement phases in parallel with continuing manufacturing cost assessment studies. This approach will be accomplished principally by contract with industry to develop advanced components and subsystems. This advanced hardware will be tested to establish 'technology readiness' both under controlled laboratory conditions and under real sun conditions.
NASA Technical Reports Server (NTRS)
Szczur, Martha R.
1991-01-01
The Transportable Applications Environment (TAE) Plus, developed at NASA's Goddard Space Flight Center, is an advanced portable user interface development environment which simplifies the process of creating and managing complex application graphical user interfaces (GUIs), supports prototyping, allows applications to be oported easily between different platforms, and encourages appropriate levels of user interface consistency between applications. This paper discusses the capabilities of the TAE Plus tool, and how it makes the job of designing and developing GUIs easier for the application developers. The paper also explains how tools like TAE Plus provide for reusability and ensure reliability of UI software components, as well as how they aid in the reduction of development and maintenance costs.
2013-12-03
CAPE CANAVERAL, Fla. -- A truck sprays water along the crawlerway to reduce dust ahead of crawler-transporter 1 as it continues its trek to Launch Pad 39A at NASA’s Kennedy Space Center in Florida. New jacking, equalizing and leveling, or JEL, hydraulic cylinders were installed on CT-1 and will be tested for increased load carrying capacity and reliability. The Ground Systems Development and Operations Program at Kennedy continues to upgrade the crawler-transporter as part of its general maintenance. CT-1 could be available to carry a variety of launch vehicles to the launch pad. Two crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Jim Grossmann
2013-12-02
CAPE CANAVERAL, Fla. -- A truck sprays water along the crawlerway to reduce dust ahead of crawler-transporter 1 as it begins its trek to Launch Pad 39A at NASA’s Kennedy Space Center in Florida. New jacking, equalizing and leveling, or JEL, hydraulic cylinders were installed on CT-1 and are being tested for increased load carrying capacity and reliability. The Ground Systems Development and Operations Program at Kennedy continues to upgrade the crawler-transporter as part of its general maintenance. CT-1 could be available to carry a variety of launch vehicles to the launch pad. Two crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Daniel Casper
2011-02-08
CAPE CANAVERAL, Fla. -- A traditional ribbon-cutting ceremony takes place inside the new 18,500-square-foot Electrical Maintenance Facility (EMF) at NASA's Kennedy Space Center in Florida. From left are Kennedy Director of Operations Mike Benik, NASA Construction of Facility Project Manager Nick Rivieccio and Kennedy Center Director Bob Cabana. Located in Kennedy's Launch Complex 39 area, the EMF will provide new and renovated space for maintenance shops, offices, and equipment and material storage in support of the electrical maintenance functions for the center. The facility is projected to receive Gold certification under the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) rating system. Photo credit: NASA/ Troy Cryder
Reliability Centred Maintenance (RCM) Analysis of Laser Machine in Filling Lithos at PT X
NASA Astrophysics Data System (ADS)
Suryono, M. A. E.; Rosyidi, C. N.
2018-03-01
PT. X used automated machines which work for sixteen hours per day. Therefore, the machines should be maintained to keep the availability of the machines. The aim of this research is to determine maintenance tasks according to the cause of component’s failure using Reliability Centred Maintenance (RCM) and determine the amount of optimal inspection frequency which must be performed to the machine at filling lithos process. In this research, RCM is used as an analysis tool to determine the critical component and find optimal inspection frequencies to maximize machine’s reliability. From the analysis, we found that the critical machine in filling lithos process is laser machine in Line 2. Then we proceed to determine the cause of machine’s failure. Lastube component has the highest Risk Priority Number (RPN) among other components such as power supply, lens, chiller, laser siren, encoder, conveyor, and mirror galvo. Most of the components have operational consequences and the others have hidden failure consequences and safety consequences. Time-directed life-renewal task, failure finding task, and servicing task can be used to overcome these consequences. The results of data analysis show that the inspection must be performed once a month for laser machine in the form of preventive maintenance to lowering the downtime.
NASA Astrophysics Data System (ADS)
Yu, Zheng
2002-08-01
Facing the new demands of the optical fiber communications market, almost all the performance and reliability of optical network system are dependent on the qualification of the fiber optics components. So, how to comply with the system requirements, the Telcordia / Bellcore reliability and high-power testing has become the key issue for the fiber optics components manufacturers. The qualification of Telcordia / Bellcore reliability or high-power testing is a crucial issue for the manufacturers. It is relating to who is the outstanding one in the intense competition market. These testing also need maintenances and optimizations. Now, work on the reliability and high-power testing have become the new demands in the market. The way is needed to get the 'Triple-Win' goal expected by the component-makers, the reliability-testers and the system-users. To those who are meeting practical problems for the testing, there are following seven topics that deal with how to shoot the common mistakes to perform qualify reliability and high-power testing: ¸ Qualification maintenance requirements for the reliability testing ¸ Lots control for preparing the reliability testing ¸ Sampling select per the reliability testing ¸ Interim measurements during the reliability testing ¸ Basic referencing factors relating to the high-power testing ¸ Necessity of re-qualification testing for the changing of producing ¸ Understanding the similarity for product family by the definitions
Problematics of Reliability of Road Rollers
NASA Astrophysics Data System (ADS)
Stawowiak, Michał; Kuczaj, Mariusz
2018-06-01
This article refers to the reliability of road rollers used in a selected roadworks company. Information on the method of road rollers service and how the service affects the reliability of these rollers is presented. Attention was paid to the process of the implemented maintenance plan with regard to the machine's operational time. The reliability of road rollers was analyzed by determining and interpreting readiness coefficients.
42 CFR 413.198 - Recordkeeping and cost reporting requirements for outpatient maintenance dialysis.
Code of Federal Regulations, 2010 CFR
2010-10-01
... outpatient maintenance dialysis. 413.198 Section 413.198 Public Health CENTERS FOR MEDICARE & MEDICAID... § 413.198 Recordkeeping and cost reporting requirements for outpatient maintenance dialysis. (a) Purpose... will enable CMS to determine the costs incurred in furnishing outpatient maintenance dialysis as...
Facility Management Child Care Resource Book. Child Care Operations Center of Expertise.
ERIC Educational Resources Information Center
General Services Administration, Washington, DC. Public Buildings Service.
This guidebook provides maintenance and operations guidelines for managing General Services Administration (GSA) child care centers within the same standards and level of a GSA operated facility. Areas covered address cleaning standards and guidelines; equipment funding and inventory; maintenance of living environments and problem areas;…
2003-09-12
KENNEDY SPACE CENTER, FLA. - Launch Pad 39A undergoes sandblasting of its metal structures and surfaces. Routine maintenance includes sandblasting and repainting as preventive means to minimize corrosion.
Relocation of the Deep Space Network Maintenance Center
NASA Technical Reports Server (NTRS)
Beutler, K. F.
1981-01-01
The Jet Propulsion Laboratory maintains a Deep Space Network (DSN) maintenance center (DMC), whose task is to engineer and manage the repair and calibration program for the electronic and mechanical equipment used in the tracking stations located at Madrid, Spain, and Canberra, Australia. The DMC also manages the Goldstone complex maintenance facility (GCMF), whose task is to repair and calibrate the Goldstone electronic and mechanical equipment. The rationale for moving the facility to Barstow, California, and the benefits derived from the move are discussed.
Grusenmeyer, Corinne
2014-12-01
Maintenance activities are identified as critical both to operator safety and to systems safety and reliability. However, it is still difficult to identify maintenance workers in French occupational accident and disease statistics. Moreover, few analyses of these activities and of organizational changes in this field have been conducted. This paper presents two different approaches to this same issue. Analyses were aimed firstly at identifying the occupational exposures of these operators and at comparing them with occupational exposures of production staff and, secondly at developing understanding of normal real maintenance activities, i.e. maintenance activities that are normally actually carried out, while taking into account the socio-technical system and maintenance organization within which they lie. The use of the French SUMER 2003 survey shows that occupational exposures of maintenance staff to various constraints are more frequent than occupational exposures of their production colleagues. However, maintenance staff appear to have greater independence. Analyses were also conducted in a subcontracting urban public transport company, who outsources some maintenance work. Those analyses highlight a complex network of companies involved in maintenance activities, a substantial number of work interruptions and a significant fragmentation of the internal technicians' activities that can be cognitively costly, reduce anticipation possibilities and lead to incidents or accidents. Above all they underline internal technicians' contributions to the completion of outsourced interventions and interdependent relationships between the activities of the internal and the external technicians. Outsourcing maintenance interventions thus raises the question of risks associated with the interdependence of actual work activities undertaken by the different types of staff, since they contribute to the same maintenance intervention. This study therefore pinpoints the need to integrate inter-organizational interactions in order to understand the variability of maintenance activities and its relationships with reliability and safety. In this respect, some suggestions are provided with a prevention aim. Copyright © 2014 Elsevier Ltd. All rights reserved.
The 747 primary flight control systems reliability and maintenance study
NASA Technical Reports Server (NTRS)
1979-01-01
The major operational characteristics of the 747 Primary Flight Control Systems (PFCS) are described. Results of reliability analysis for separate control functions are presented. The analysis makes use of a NASA computer program which calculates reliability of redundant systems. Costs for maintaining the 747 PFCS in airline service are assessed. The reliabilities and cost will provide a baseline for use in trade studies of future flight control system design.
2016-06-01
HELICOPTER FLEET Hasnan bin Mohamad Rais Major, Malaysian Army B.S., University Technology of Malaysia , 2000 Submitted in partial...HELICOPTER MAINTENANCE POLICY B. The objective of MAA helicopter maintenance activities is to preserve helicopter safety and mission reliability to
7 CFR 1730.21 - Inspections and tests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... reliability and security of the electric power grid, cause significant risk to the safety and health of the... AGRICULTURE ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.21... parts of its electric system, annually exercise its ERP, and maintain records of such inspections and...
Abidi, S S
2001-06-01
Worldwide healthcare delivery trends are undergoing a subtle paradigm shift--patient centered services as opposed to provider centered services and wellness maintenance as opposed to illness management. In this paper we present a Tele-Healthcare project TIDE--Tele-Healthcare Information and Diagnostic Environment. TIDE manifests an 'intelligent' healthcare environment that aims to ensure lifelong coverage of person-specific health maintenance decision-support services--i.e., both wellness maintenance and illness management services--ubiquitously available via the Internet/WWW. Taking on an all-encompassing health maintenance role--spanning from wellness to illness issues--the functionality of TIDE involves the generation and delivery of (a) Personalized, Pro-active, Persistent, Perpetual, and Present wellness maintenance services, and (b) remote diagnostic services for managing noncritical illnesses. Technically, TIDE is an amalgamation of diverse computer technologies--Artificial Intelligence, Internet, Multimedia, Databases, and Medical Informatics--to implement a sophisticated healthcare delivery infostructure.
2003-09-12
KENNEDY SPACE CENTER, FLA. - A worker sandblasts the surface behind the Mobile Launcher Platform on Launch Pad 39A . Routine maintenance includes sandblasting and repainting as preventive means to minimize corrosion.
Transmission overhaul estimates for partial and full replacement at repair
NASA Technical Reports Server (NTRS)
Savage, M.; Lewicki, D. G.
1991-01-01
Timely transmission overhauls increase in-flight service reliability greater than the calculated design reliabilities of the individual aircraft transmission components. Although necessary for aircraft safety, transmission overhauls contribute significantly to aircraft expense. Predictions of a transmission's maintenance needs at the design stage should enable the development of more cost effective and reliable transmissions in the future. The frequency is estimated of overhaul along with the number of transmissions or components needed to support the overhaul schedule. Two methods based on the two parameter Weibull statistical distribution for component life are used to estimate the time between transmission overhauls. These methods predict transmission lives for maintenance schedules which repair the transmission with a complete system replacement or repair only failed components of the transmission. An example illustrates the methods.
Reliability-based optimization of maintenance scheduling of mechanical components under fatigue
Beaurepaire, P.; Valdebenito, M.A.; Schuëller, G.I.; Jensen, H.A.
2012-01-01
This study presents the optimization of the maintenance scheduling of mechanical components under fatigue loading. The cracks of damaged structures may be detected during non-destructive inspection and subsequently repaired. Fatigue crack initiation and growth show inherent variability, and as well the outcome of inspection activities. The problem is addressed under the framework of reliability based optimization. The initiation and propagation of fatigue cracks are efficiently modeled using cohesive zone elements. The applicability of the method is demonstrated by a numerical example, which involves a plate with two holes subject to alternating stress. PMID:23564979
NASA Technical Reports Server (NTRS)
Eichenberg, Dennis J.
2007-01-01
The NASA Glenn Research Center s Avionics, Power and Communications Branch of the Engineering and Systems Division initiated the Hybrid Power Management (HPM) Program for the GRC Technology Transfer and Partnership Office. HPM is the innovative integration of diverse, state-of-the-art power devices in an optimal configuration for space and terrestrial applications. The appropriate application and control of the various power devices significantly improves overall system performance and efficiency. The advanced power devices include ultracapacitors and fuel cells. HPM has extremely wide potential. Applications include power generation, transportation systems, biotechnology systems, and space power systems. HPM has the potential to significantly alleviate global energy concerns, improve the environment, and stimulate the economy. One of the unique power devices being utilized by HPM for energy storage is the ultracapacitor. An ultracapacitor is an electrochemical energy storage device, which has extremely high volumetric capacitance energy due to high surface area electrodes, and very small electrode separation. Ultracapacitors are a reliable, long life, maintenance free, energy storage system. This flexible operating system can be applied to all power systems to significantly improve system efficiency, reliability, and performance. There are many existing and conceptual applications of HPM.
The Virtual Xenbase: transitioning an online bioinformatics resource to a private cloud
Karimi, Kamran; Vize, Peter D.
2014-01-01
As a model organism database, Xenbase has been providing informatics and genomic data on Xenopus (Silurana) tropicalis and Xenopus laevis frogs for more than a decade. The Xenbase database contains curated, as well as community-contributed and automatically harvested literature, gene and genomic data. A GBrowse genome browser, a BLAST+ server and stock center support are available on the site. When this resource was first built, all software services and components in Xenbase ran on a single physical server, with inherent reliability, scalability and inter-dependence issues. Recent advances in networking and virtualization techniques allowed us to move Xenbase to a virtual environment, and more specifically to a private cloud. To do so we decoupled the different software services and components, such that each would run on a different virtual machine. In the process, we also upgraded many of the components. The resulting system is faster and more reliable. System maintenance is easier, as individual virtual machines can now be updated, backed up and changed independently. We are also experiencing more effective resource allocation and utilization. Database URL: www.xenbase.org PMID:25380782
Sezdi, Mana
2016-01-01
A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices.
Sezdi, Mana
2016-01-01
A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices. PMID:27195666
Methods of increasing efficiency and maintainability of pipeline systems
NASA Astrophysics Data System (ADS)
Ivanov, V. A.; Sokolov, S. M.; Ogudova, E. V.
2018-05-01
This study is dedicated to the issue of pipeline transportation system maintenance. The article identifies two classes of technical-and-economic indices, which are used to select an optimal pipeline transportation system structure. Further, the article determines various system maintenance strategies and strategy selection criteria. Meanwhile, the maintenance strategies turn out to be not sufficiently effective due to non-optimal values of maintenance intervals. This problem could be solved by running the adaptive maintenance system, which includes a pipeline transportation system reliability improvement algorithm, especially an equipment degradation computer model. In conclusion, three model building approaches for determining optimal technical systems verification inspections duration were considered.
14 CFR 171.43 - Requests for IFR procedure.
Code of Federal Regulations, 2010 CFR
2010-01-01
... organization and a maintenance manual that meets the requirements of § 171.51. (4) A statement of intent to... operational reliability and an acceptable standard of performance. Previous equivalent operational experience... owner of the results and of any required changes in the facility or the maintenance manual or...
Operations and Maintenance Introductory O&M Newsletter | Poster
The Operations and Maintenance (O&M) department has been serving and supporting the NCI scientific mission since 1972. Our dedicated staff works 24/7 behind the scenes to ensure that the NCI campus and laboratory environments are safe, functional, and reliable, as well as comfortable and aesthetically pleasing.
Wastewater pond systems provide reliable, low cost, and relatively low maintenance treatment for municipal and industrial discharges. However, they do have certain design, operations, and maintenance requirements. While the basic models have not changed in the 30-odd years sinc...
Space shuttle maintenance program planning document
NASA Technical Reports Server (NTRS)
Brown, D. V.
1972-01-01
A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.
Integration of infrared thermography into various maintenance methodologies
NASA Astrophysics Data System (ADS)
Morgan, William T.
1993-04-01
Maintenance methodologies are in developmental stages throughout the world as global competitiveness drives all industries to improve operational efficiencies. Rapid progress in technical advancements has added an additional strain on maintenance organizations to progressively change. Accompanying needs for advanced training and documentation is the demand for utilization of various analytical instruments and quantitative methods. Infrared thermography is one of the primary elements of engineered approaches to maintenance. Current maintenance methodologies can be divided into six categories; Routine ('Breakdown'), Preventive, Predictive, Proactive, Reliability-Based, and Total Productive (TPM) maintenance. Each of these methodologies have distinctive approaches to achieving improved operational efficiencies. Popular though is that infrared thermography is a Predictive maintenance tool. While this is true, it is also true that it can be effectively integrated into each of the maintenance methodologies for achieving desired results. The six maintenance strategies will be defined. Infrared applications integrated into each will be composed in tabular form.
Making a Reliable Actuator Faster and More Affordable
NASA Technical Reports Server (NTRS)
2005-01-01
Before any rocket is allowed to fly and be used for a manned mission, it is first test-fired on a static test stand to verify its flight readiness. NASA s Stennis Space Center provides testing of Space Shuttle Main Engines, rocket propulsion systems, and related components with several test facilities. It has been NASA s test-launch site since 1961. The testing stations age with time and repeated use; and with aging comes maintenance; and with maintenance comes expense. NASA has been seeking ways to lower the cost of maintaining the stations, and has aided in the development of an improved reliable linear actuator that arrives onsite quickly and costs less money than other actuators. In general terms, a linear actuator is a servomechanism that supplies a measured amount of energy for the operation of another mechanical system. Accuracy, reliability, and speed of the actuator are critical to performance of the entire system, and these actuators are critical components of the engine test stands. Partnership An actuator was developed as part of a Dual-Use Cooperative Agreement between BAFCO, Inc., of Warminister, Pennsylvania, and Stennis. BAFCO identified four suppliers that manufactured actuator components that met the rigorous testing standards imposed by the Space Agency and then modified these components for application on the rocket test stands. In partnership with BAFCO, the existing commercial products size and weight were reworked, reducing cost and delivery time. Previously, these parts would cost between $20,000 and $22,000, but with the new process, they now run between $11,000 and $13,000, a substantial savings, considering NASA has already purchased over 120 of the units. Delivery time of the cost-saving actuators has also been cut from over 20 to 22 weeks to within 8 to 10 weeks. The redesigned actuator is commercially available, and the company is successfully supplying them to customers other than NASA.
Assuring reliability program effectiveness.
NASA Technical Reports Server (NTRS)
Ball, L. W.
1973-01-01
An attempt is made to provide simple identification and description of techniques that have proved to be most useful either in developing a new product or in improving reliability of an established product. The first reliability task is obtaining and organizing parts failure rate data. Other tasks are parts screening, tabulation of general failure rates, preventive maintenance, prediction of new product reliability, and statistical demonstration of achieved reliability. Five principal tasks for improving reliability involve the physics of failure research, derating of internal stresses, control of external stresses, functional redundancy, and failure effects control. A final task is the training and motivation of reliability specialist engineers.
Alwan, Faris M; Baharum, Adam; Hassan, Geehan S
2013-01-01
The reliability of the electrical distribution system is a contemporary research field due to diverse applications of electricity in everyday life and diverse industries. However a few research papers exist in literature. This paper proposes a methodology for assessing the reliability of 33/11 Kilovolt high-power stations based on average time between failures. The objective of this paper is to find the optimal fit for the failure data via time between failures. We determine the parameter estimation for all components of the station. We also estimate the reliability value of each component and the reliability value of the system as a whole. The best fitting distribution for the time between failures is a three parameter Dagum distribution with a scale parameter [Formula: see text] and shape parameters [Formula: see text] and [Formula: see text]. Our analysis reveals that the reliability value decreased by 38.2% in each 30 days. We believe that the current paper is the first to address this issue and its analysis. Thus, the results obtained in this research reflect its originality. We also suggest the practicality of using these results for power systems for both the maintenance of power systems models and preventive maintenance models.
Alwan, Faris M.; Baharum, Adam; Hassan, Geehan S.
2013-01-01
The reliability of the electrical distribution system is a contemporary research field due to diverse applications of electricity in everyday life and diverse industries. However a few research papers exist in literature. This paper proposes a methodology for assessing the reliability of 33/11 Kilovolt high-power stations based on average time between failures. The objective of this paper is to find the optimal fit for the failure data via time between failures. We determine the parameter estimation for all components of the station. We also estimate the reliability value of each component and the reliability value of the system as a whole. The best fitting distribution for the time between failures is a three parameter Dagum distribution with a scale parameter and shape parameters and . Our analysis reveals that the reliability value decreased by 38.2% in each 30 days. We believe that the current paper is the first to address this issue and its analysis. Thus, the results obtained in this research reflect its originality. We also suggest the practicality of using these results for power systems for both the maintenance of power systems models and preventive maintenance models. PMID:23936346
Integrated Systems Health Management (ISHM) Toolkit
NASA Technical Reports Server (NTRS)
Venkatesh, Meera; Kapadia, Ravi; Walker, Mark; Wilkins, Kim
2013-01-01
A framework of software components has been implemented to facilitate the development of ISHM systems according to a methodology based on Reliability Centered Maintenance (RCM). This framework is collectively referred to as the Toolkit and was developed using General Atomics' Health MAP (TM) technology. The toolkit is intended to provide assistance to software developers of mission-critical system health monitoring applications in the specification, implementation, configuration, and deployment of such applications. In addition to software tools designed to facilitate these objectives, the toolkit also provides direction to software developers in accordance with an ISHM specification and development methodology. The development tools are based on an RCM approach for the development of ISHM systems. This approach focuses on defining, detecting, and predicting the likelihood of system functional failures and their undesirable consequences.
Design of a Facility to Test the Advanced Stirling Radioisotope Generator Engineering Unit
NASA Technical Reports Server (NTRS)
Lewandowski, Edward J.; Schreiber, Jeffrey G.; Oriti, Salvatore M.; Meer, David W.; Brace, Michael H.; Dugala, Gina
2010-01-01
The Advanced Stirling Radioisotope Generator (ASRG), a high efficiency generator, is being considered for space missions. An engineering unit, the ASRG engineering unit (EU), was designed and fabricated by Lockheed Martin under contract to the Department of Energy. This unit is currently under extended operation test at the NASA Glenn Research Center (GRC) to generate performance data and validate the life and reliability predictions for the generator and the Stirling convertors. A special test facility was designed and built for the ASRG EU. This paper summarizes details of the test facility design, including the mechanical mounting, heat-rejection system, argon system, control systems, and maintenance. The effort proceeded from requirements definition through design, analysis, build, and test. Initial testing and facility performance results are discussed.
Gearbox Instrumentation for the Investigation of Bearing Axial Cracking
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keller, Jonathan A; Lambert, Scott R
Failures in gearbox bearings have been the primary source of reliability issues for wind turbine drivetrains, leading to costly downtime and unplanned maintenance. The most common failure mode is attributed to so-called axial cracks or white-etching cracks, which primarily affect the intermediate and high-speed-stage bearings. The high-speed-shaft and bearing loads and sliding will be measured with a specially instrumented gearbox installed in a 1.5-megawatt turbine at the National Wind Technology Center in an upcoming test campaign. Additional instrumentation will also measure the tribological environment of these bearings, including bearing temperatures, lubricant temperature and water content, air temperature and humidity, andmore » stray electrical current across the bearings. This paper fully describes the instrumentation package and summarizes initial results.« less
2003-09-12
KENNEDY SPACE CENTER, FLA. - Sandblasting begins on the Mobile Launcher Platform on Launch Pad 39A to remove corrosion before repainting. Routine maintenance includes sandblasting and repainting as preventive means to minimize corrosion.
Southwestern Division 2012 History Report
2013-05-01
maintenance to be performed. Examples of additional maintenance included hydraulic piping replacement, motor control center upgrades, miter gates anchorage...in CEBIS. WATER MANAGEMENT PROGRAM 2012 Hydrology , Hydraulics and Water Management Programs 2012: In March 2012, the Corps’ SWD office...hosted the annual “2012 Reservoir Control Center/Hydrology and Hydraulics annual meeting. The meeting was held in Tulsa, Oklahoma at the Tulsa
Analysis of Employability for the Civil Aviation Maintenance Graduates of Turkey
ERIC Educational Resources Information Center
Denizhan, Berrin; Dogru, Alperen
2017-01-01
Purpose: With every passing day, the center of gravity for air traffic for the Middle East and Turkey is shifting toward becoming a center for airway transport, maintenance, repair, overhaul (MRO) and transfer. The MRO sector is gaining importance because of this increase in Turkey. The purpose of this study is to examine the future employability…
Abraham, Jean Marie; Crespin, Daniel; Rothman, Alexander
2015-01-01
Objective Investigate the initiation and maintenance of participation in an employer-based wellness program that provides financial incentives for fitness center utilization. Methods Using multivariate analysis, we investigated how employees’ demographics, health status, exercise-related factors, and lifestyle change preferences affect program participation. Results Forty-two percent of eligible employees participated in the program and 24% earned a $20 incentive at least once by utilizing a gym 8 times or more in a month. On average, participants utilized fitness centers 7.0 months each year and earned credit 4.5 months. Participants’ utilization diminished after their first year in the program. Conclusions Factors associated with initiation and maintenance of fitness center utilization were similar. Declining utilization over time raises concern about the long-run effectiveness of fitness-focused wellness programs. Employers may want to consider additional levers to positively reinforce participation. PMID:26340283
Alternative Fuels Data Center: Liquefied Natural Gas Allows for Cleaner
maintenance facilities to support them. This effort has contributed to millions of dollars saved and more than operation and maintenance of the vehicles. The city constructed a new LNG maintenance facility and then recently retrofitted an existing maintenance facility with the necessary methane detectors, alarms, and
Myer, Gregory D; Wordeman, Samuel C; Sugimoto, Dai; Bates, Nathaniel A; Roewer, Benjamin D; Medina McKeon, Jennifer M; DiCesare, Christopher A; Di Stasi, Stephanie L; Barber Foss, Kim D; Thomas, Staci M; Hewett, Timothy E
2014-05-01
Multi-center collaborations provide a powerful alternative to overcome the inherent limitations to single-center investigations. Specifically, multi-center projects can support large-scale prospective, longitudinal studies that investigate relatively uncommon outcomes, such as anterior cruciate ligament injury. This project was conceived to assess within- and between-center reliability of an affordable, clinical nomogram utilizing two-dimensional video methods to screen for risk of knee injury. The authors hypothesized that the two-dimensional screening methods would provide good-to-excellent reliability within and between institutions for assessment of frontal and sagittal plane biomechanics. Nineteen female, high school athletes participated. Two-dimensional video kinematics of the lower extremity during a drop vertical jump task were collected on all 19 study participants at each of the three facilities. Within-center and between-center reliability were assessed with intra- and inter-class correlation coefficients. Within-center reliability of the clinical nomogram variables was consistently excellent, but between-center reliability was fair-to-good. Within-center intra-class correlation coefficient for all nomogram variables combined was 0.98, while combined between-center inter-class correlation coefficient was 0.63. Injury risk screening protocols were reliable within and repeatable between centers. These results demonstrate the feasibility of multi-site biomechanical studies and establish a framework for further dissemination of injury risk screening algorithms. Specifically, multi-center studies may allow for further validation and optimization of two-dimensional video screening tools. 2b.
Improving the Reliability of Technological Subsystems Equipment for Steam Turbine Unit in Operation
NASA Astrophysics Data System (ADS)
Brodov, Yu. M.; Murmansky, B. E.; Aronson, R. T.
2017-11-01
The authors’ conception is presented of an integrated approach to reliability improving of the steam turbine unit (STU) state along with its implementation examples for the various STU technological subsystems. Basing on the statistical analysis of damage to turbine individual parts and components, on the development and application of modern methods and technologies of repair and on operational monitoring techniques, the critical components and elements of equipment are identified and priorities are proposed for improving the reliability of STU equipment in operation. The research results are presented of the analysis of malfunctions for various STU technological subsystems equipment operating as part of power units and at cross-linked thermal power plants and resulting in turbine unit shutdown (failure). Proposals are formulated and justified for adjustment of maintenance and repair for turbine components and parts, for condenser unit equipment, for regeneration subsystem and oil supply system that permit to increase the operational reliability, to reduce the cost of STU maintenance and repair and to optimize the timing and amount of repairs.
The measurement of maintenance function efficiency through financial KPIs
NASA Astrophysics Data System (ADS)
Galar, D.; Parida, A.; Kumar, U.; Baglee, D.; Morant, A.
2012-05-01
The measurement of the performance in the maintenance function has produced large sets of indicators that due to their nature and disparity in criteria and objectives have been grouped in different subsets lately, emphasizing the set of financial indicators. The generation of these indicators demands data collection of high reliability that is only made possible through a model of costs adapted to the special casuistry of the maintenance function, characterized by the occultism of these costs.
2001-08-01
The electro-mechanical actuator, a new electronics technology, is an electronic system that provides the force needed to move valves that control the flow of propellant to the engine. It is proving to be advantageous for the main propulsion system plarned for a second generation reusable launch vehicle. Hydraulic actuators have been used successfully in rocket propulsion systems. However, they can leak when high pressure is exerted on such a fluid-filled hydraulic system. Also, hydraulic systems require significant maintenance and support equipment. The electro-mechanical actuator is proving to be low maintenance and the system weighs less than a hydraulic system. The electronic controller is a separate unit powering the actuator. Each actuator has its own control box. If a problem is detected, it can be replaced by simply removing one defective unit. The hydraulic systems must sustain significant hydraulic pressures in a rocket engine regardless of demand. The electro-mechanical actuator utilizes power only when needed. A goal of the Second Generation Reusable Launch Vehicle Program is to substantially improve safety and reliability while reducing the high cost of space travel. The electro-mechanical actuator was developed by the Propulsion Projects Office of the Second Generation Reusable Launch Vehicle Program at the Marshall Space Flight Center.
Logistics Operations Management Center: Maintenance Support Baseline (LOMC-MSB)
NASA Technical Reports Server (NTRS)
Kurrus, R.; Stump, F.
1995-01-01
The Logistics Operations Management Center Maintenance Support Baseline is defined. A historical record of systems, applied to and deleted from, designs in support of future management and/or technical analysis is provided. All Flight elements, Ground Support Equipment, Facility Systems and Equipment and Test Support Equipment for which LOMC has responsibilities at Kennedy Space Center and other locations are listed. International Space Station Alpha Program documentation is supplemented. The responsibility of the Space Station Launch Site Support Office is established.
14 CFR 171.3 - Requests for IFR procedure.
Code of Federal Regulations, 2010 CFR
2010-01-01
... manual that meets the requirements of § 171.11. (4) A statement of intention to meet the requirements of this subpart. (5) A showing that the facility has an acceptable level of operational reliability and an... required changes in the facility or the maintenance manual or maintenance organization. The owner must then...
Payload maintenance cost model for the space telescope
NASA Technical Reports Server (NTRS)
White, W. L.
1980-01-01
An optimum maintenance cost model for the space telescope for a fifteen year mission cycle was developed. Various documents and subsequent updates of failure rates and configurations were made. The reliability of the space telescope for one year, two and one half years, and five years were determined using the failure rates and configurations. The failure rates and configurations were also used in the maintenance simulation computer model which simulate the failure patterns for the fifteen year mission life of the space telescope. Cost algorithms associated with the maintenance options as indicated by the failure patterns were developed and integrated into the model.
An approximation formula for a class of Markov reliability models
NASA Technical Reports Server (NTRS)
White, A. L.
1984-01-01
A way of considering a small but often used class of reliability model and approximating algebraically the systems reliability is shown. The models considered are appropriate for redundant reconfigurable digital control systems that operate for a short period of time without maintenance, and for such systems the method gives a formula in terms of component fault rates, system recovery rates, and system operating time.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hill, Roger R.; Klise, Geoffrey Taylor; Balfour, John R.
Characterizing the factors that affect reliability of a photovoltaic (PV) power plant is an important aspect of optimal asset management. This document describes the many factors that affect operation and maintenance (O&M) of a PV plant, identifies the data necessary to quantify those factors, and describes how data might be used by O&M service providers and others in the PV industry. This document lays out data needs from perspectives of reliability, availability, and key performance indicators and is intended to be a precursor for standardizing terminology and data reporting, which will improve data sharing, analysis, and ultimately PV plant performance.
How the Station will operate. [operation, management, and maintenance in space
NASA Technical Reports Server (NTRS)
Cox, John T.
1988-01-01
Aspects of the upcoming operational phase of the Space Station (SS) are examined. What the crew members will do with their time in their specialized roles is addressed. SS maintenance and servicing and the interaction of the SS Control Center with Johnson Space Center is discussed. The planning of payload operations and strategic planning for the SS are examined.
Predicting Cost/Reliability/Maintainability of Advanced General Aviation Avionics Equipment
NASA Technical Reports Server (NTRS)
Davis, M. R.; Kamins, M.; Mooz, W. E.
1978-01-01
A methodology is provided for assisting NASA in estimating the cost, reliability, and maintenance (CRM) requirements for general avionics equipment operating in the 1980's. Practical problems of predicting these factors are examined. The usefulness and short comings of different approaches for modeling coast and reliability estimates are discussed together with special problems caused by the lack of historical data on the cost of maintaining general aviation avionics. Suggestions are offered on how NASA might proceed in assessing cost reliability CRM implications in the absence of reliable generalized predictive models.
Alternative Fuels Data Center: Propane
they work, and find information about vehicle availability, conversions, emissions, maintenance, and Fuel Prices Conserve Fuel Idle Reduction Parts & Equipment Maintenance Driving Behavior Fleet
Characterization of a Regenerable Impactor Filter for Spacecraft Cabin Applications
NASA Technical Reports Server (NTRS)
Agui, Juan H.; Vijayakumar, R.
2015-01-01
Regenerable filters will play an important role in human exploration beyond low-Earth orbit. Life Support Systems aboard crewed spacecrafts will have to operate reliably and with little maintenance over periods of more than a year, even multiple years. Air filters are a key component of spacecraft life support systems, but they often require frequent routine maintenance. Bacterial filters aboard the International Space Station require almost weekly cleaning of the pre-filter screen to remove large lint debris captured in the microgravity environment. The source of the airborne matter which is collected on the filter screen is typically from clothing fibers, biological matter (hair, skin, nails, etc.) and material wear. Clearly a need for low maintenance filters requiring little to no crew intervention will be vital to the success of the mission. An impactor filter is being developed and tested to address this need. This filter captures large particle matter through inertial separation and impaction methods on collection surfaces, which can be automatically cleaned after they become heavily loaded. The impactor filter can serve as a pre-filter to augment the life of higher efficiency filters that capture fine and ultrafine particles. A prototype of the filter is being tested at the Particulate Filtration Laboratory at NASA Glenn Research Center to determine performance characteristics, including particle cut size and overall efficiency. Model results are presented for the flow characteristics near the orifice plate through which the particle-laden flow is accelerated as well as around the collection bands.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wright, J.L.
1992-06-18
Properly selected and maintained chain drives can be expected to give thousands of hours of reliable service. Selection is usually done just once. This paper reports on good maintenance which must be done regularly to keep the drive operating. An effective maintenance program for roller chain should include correct type and adequate amounts of lubrication, replacement of worn chains and sprockets, and elimination of drive interferences. It is important to set u a lubrication and inspection/correction schedule to ensure that all required maintenance is carried out.
Secure data exchange between intelligent devices and computing centers
NASA Astrophysics Data System (ADS)
Naqvi, Syed; Riguidel, Michel
2005-03-01
The advent of reliable spontaneous networking technologies (commonly known as wireless ad-hoc networks) has ostensibly raised stakes for the conception of computing intensive environments using intelligent devices as their interface with the external world. These smart devices are used as data gateways for the computing units. These devices are employed in highly volatile environments where the secure exchange of data between these devices and their computing centers is of paramount importance. Moreover, their mission critical applications require dependable measures against the attacks like denial of service (DoS), eavesdropping, masquerading, etc. In this paper, we propose a mechanism to assure reliable data exchange between an intelligent environment composed of smart devices and distributed computing units collectively called 'computational grid'. The notion of infosphere is used to define a digital space made up of a persistent and a volatile asset in an often indefinite geographical space. We study different infospheres and present general evolutions and issues in the security of such technology-rich and intelligent environments. It is beyond any doubt that these environments will likely face a proliferation of users, applications, networked devices, and their interactions on a scale never experienced before. It would be better to build in the ability to uniformly deal with these systems. As a solution, we propose a concept of virtualization of security services. We try to solve the difficult problems of implementation and maintenance of trust on the one hand, and those of security management in heterogeneous infrastructure on the other hand.
2011-02-08
CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center in Florida hosts a ribbon-cutting ceremony at a new 18,500-square-foot Electrical Maintenance Facility (EMF) officially opening for business. Addressing the attendees is NASA Construction of Facility Project Manager Nick Rivieccio. Located in Kennedy's Launch Complex 39 area, the EMF will provide new and renovated space for maintenance shops, offices, and equipment and material storage in support of the electrical maintenance functions for the center. The facility is projected to receive Gold certification under the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) rating system. Photo credit: NASA/ Troy Cryder
2011-02-08
CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center in Florida hosts a ribbon-cutting ceremony at a new 18,500-square-foot Electrical Maintenance Facility (EMF) officially opening for business. Addressing the attendees is Kennedy Director of Operations Mike Benik. Located in Kennedy's Launch Complex 39 area, the EMF will provide new and renovated space for maintenance shops, offices, and equipment and material storage in support of the electrical maintenance functions for the center. The facility is projected to receive Gold certification under the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) rating system. Photo credit: NASA/ Troy Cryder
Preliminary Analysis of LORAN-C System Reliability for Civil Aviation.
1981-09-01
overviev of the analysis technique. Section 3 describes the computerized LORAN-C coverage model which is used extensively in the reliability analysis...Xth Plenary Assembly, Geneva, 1963, published by International Telecomunications Union. S. Braff, R., Computer program to calculate a Karkov Chain Reliability Model, unpublished york, MITRE Corporation. A-1 I.° , 44J Ili *Y 0E 00 ...F i8 1110 Prelim inary Analysis of Program Engineering & LORAN’C System ReliabilityMaintenance Service i ~Washington. D.C.
Integrating O/S models during conceptual design, part 3
NASA Technical Reports Server (NTRS)
Ebeling, Charles E.
1994-01-01
Space vehicles, such as the Space Shuttle, require intensive ground support prior to, during, and after each mission. Maintenance is a significant part of that ground support. All space vehicles require scheduled maintenance to ensure operability and performance. In addition, components of any vehicle are not one-hundred percent reliable so they exhibit random failures. Once detected, a failure initiates unscheduled maintenance on the vehicle. Maintenance decreases the number of missions which can be completed by keeping vehicles out of service so that the time between the completion of one mission and the start of the next is increased. Maintenance also requires resources such as people, facilities, tooling, and spare parts. Assessing the mission capability and resource requirements of any new space vehicle, in addition to performance specification, is necessary to predict the life cycle cost and success of the vehicle. Maintenance and logistics support has been modeled by computer simulation to estimate mission capability and resource requirements for evaluation of proposed space vehicles. The simulation was written with Simulation Language for Alternative Modeling II (SLAM II) for execution on a personal computer. For either one or a fleet of space vehicles, the model simulates the preflight maintenance checks, the mission and return to earth, and the post flight maintenance in preparation to be sent back into space. THe model enables prediction of the number of missions possible and vehicle turn-time (the time between completion of one mission and the start of the next) given estimated values for component reliability and maintainability. The model also facilitates study of the manpower and vehicle requirements for the proposed vehicle to meet its desired mission rate. This is the 3rd part of a 3 part technical report.
NASA Technical Reports Server (NTRS)
Malone, Roy W.; Livingston, John M.
2010-01-01
The paper describes the role of technical excellence and communication in the development and maintenance of safety and mission assurance programs. The Marshall Space Flight Center (MSFC) Safety and Mission Assurance (S&MA) organization is used to illustrate philosophies and techniques that strengthen safety and mission assurance efforts and that contribute to healthy and effective organizational cultures. The events and conditions leading to the development of the MSFC S&MA organization are reviewed. Historic issues and concerns are identified. The adverse effects of resource limitations and risk assessment roles are discussed. The structure and functions of the core safety, reliability, and quality assurance functions are presented. The current organization s mission and vision commitments serve as the starting points for the description of the current organization. The goals and objectives are presented that address the criticisms of the predecessor organizations. Additional improvements are presented that address the development of technical excellence and the steps taken to improve communication within the Center, with program customers, and with other Agency S&MA organizations.
Bonneville, Power Administration Timing System
NASA Technical Reports Server (NTRS)
Martin, Kenneth E.
1996-01-01
Time is an integral part of the Bonneville Power Administration's (BPA) operational systems. Generation and power transfers are planned in advance. Utilities coordinate with each other by making these adjustments on a timed schedule. Price varies with demand, so billing is based on time. Outages for maintenance are scheduled to assure they do not interrupt reliable power delivery. Disturbance records are aligned with recorded timetags for analysis and comparison with related information. Advanced applications like traveling wave fault location and real-time phase measurement require continuous timing with high precision. Most of BPA is served by a Central Time System (CTS) at the Dittmer Control Center near Portland, OR. This system keeps time locally and supplies time to both the control center systems and field locations via a microwave signal. It is kept synchronized to national standard time and coordinated with interconnected utilities. It is the official BPA time. Powwer system control and operation is described, followed by a description of BPA timing systems including CTS, the Fault Location Acquisition Reporter, time dissemination, and phasor measurements. References are provided for further reading.
NASA Astrophysics Data System (ADS)
Malone, Roy W.; Livingston, John M.
2010-09-01
The paper describes the role of technical excellence and communication in the development and maintenance of safety and mission assurance programs. The Marshall Space Flight Center(MSFC) Safety and Mission Assurance(S&MA) organization is used to illustrate philosophies and techniques that strengthen safety and mission assurance efforts and that contribute to healthy and effective organizational cultures. The events and conditions leading to the development of the MSFC S&MA organization are reviewed. Historic issues and concerns are identified. The adverse effects of resource limitations and risk assessment roles are discussed. The structure and functions of the core safety, reliability, and quality assurance functions are presented. The current organization’s mission and vision commitments serve as the starting points for the description of the current organization. The goals and objectives are presented that address the criticisms of the predecessor organizations. Additional improvements are presented that address the development of technical excellence and the steps taken to improve communication within the Center, with program customers, and with other Agency S&MA organizations.
Design, Development, and Maintenance of the GLOBE Program Website and Database
NASA Technical Reports Server (NTRS)
Brummer, Renate; Matsumoto, Clifford
2004-01-01
This is a 1-year (Fy 03) proposal to design and develop enhancements, implement improved efficiency and reliability, and provide responsive maintenance for the operational GLOBE (Global Learning and Observations to Benefit the Environment) Program website and database. This proposal is renewable, with a 5% annual inflation factor providing an approximate cost for the out years.
Synthetic Space Vector Modulation
2013-06-01
especially batteries without fancy controls. Inherently, DC machine commutation is environmentally sensitive and maintenance intensive at well as...reliable DC power supplies especially batteries without fancy controls. Inherently, DC machine commutation is environmentally sensitive and maintenance...Drives and Energy Systems, New Delhi, India , 20-23 December, 2010. [12] PIC18F2331/2431/4331/4431 datasheet DS39616B, Microchip Technology Inc
Code of Federal Regulations, 2010 CFR
2010-04-01
... costs needed for the reliable operation of the irrigation facility infrastructure; (8) Maintenance of a... 25 Indians 1 2010-04-01 2010-04-01 false How does BIA determine the annual operation and... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND...
Industrial Machinery Maintenance and Repair. Florida Vocational Program Guide.
ERIC Educational Resources Information Center
University of South Florida, Tampa. Dept. of Adult and Vocational Education.
This vocational program guide is intended to assist in the organization, operation, and evaluation of a program in industrial machinery maintenance and repair in school districts, area vocational centers, and community colleges. The following topics are covered: job duties of millwrights, maintenance mechanics, and machinery erectors; program…
2012-01-01
Background There is a great deal of variation in the existing capacity of primary prevention programs and policies addressing chronic disease to deliver evidence-based interventions (EBIs). In order to develop and evaluate implementation strategies that are tailored to the appropriate level of capacity, there is a need for an easy-to-administer tool to stage organizational readiness for EBIs. Methods Based on theoretical frameworks, including Rogers’ Diffusion of Innovations, we developed a survey instrument to measure four domains representing stages of readiness for EBI: awareness, adoption, implementation, and maintenance. A separate scale representing organizational climate as a potential mediator of readiness for EBIs was also included in the survey. Twenty-three questions comprised the four domains, with four to nine items each, using a seven-point response scale. Representatives from obesity, asthma, diabetes, and tobacco prevention programs serving diverse populations in the United States were surveyed (N = 243); test-retest reliability was assessed with 92 respondents. Results Confirmatory factor analysis (CFA) was used to test and refine readiness scales. Test-retest reliability of the readiness scales, as measured by intraclass correlation, ranged from 0.47–0.71. CFA found good fit for the five-item adoption and implementation scales and resulted in revisions of the awareness and maintenance scales. The awareness scale was split into two two-item scales, representing community and agency awareness. The maintenance scale was split into five- and four-item scales, representing infrastructural maintenance and evaluation maintenance, respectively. Internal reliability of scales (Cronbach’s α) ranged from 0.66–0.78. The model for the final revised scales approached good fit, with most factor loadings >0.6 and all >0.4. Conclusions The lack of adequate measurement tools hinders progress in dissemination and implementation research. These preliminary results help fill this gap by describing the reliability and measurement properties of a theory-based tool; the short, user-friendly instrument may be useful to researchers and practitioners seeking to assess organizational readiness for EBIs across a variety of chronic disease prevention programs and settings. PMID:22800294
Stamatakis, Katherine A; McQueen, Amy; Filler, Carl; Boland, Elizabeth; Dreisinger, Mariah; Brownson, Ross C; Luke, Douglas A
2012-07-16
There is a great deal of variation in the existing capacity of primary prevention programs and policies addressing chronic disease to deliver evidence-based interventions (EBIs). In order to develop and evaluate implementation strategies that are tailored to the appropriate level of capacity, there is a need for an easy-to-administer tool to stage organizational readiness for EBIs. Based on theoretical frameworks, including Rogers' Diffusion of Innovations, we developed a survey instrument to measure four domains representing stages of readiness for EBI: awareness, adoption, implementation, and maintenance. A separate scale representing organizational climate as a potential mediator of readiness for EBIs was also included in the survey. Twenty-three questions comprised the four domains, with four to nine items each, using a seven-point response scale. Representatives from obesity, asthma, diabetes, and tobacco prevention programs serving diverse populations in the United States were surveyed (N=243); test-retest reliability was assessed with 92 respondents. Confirmatory factor analysis (CFA) was used to test and refine readiness scales. Test-retest reliability of the readiness scales, as measured by intraclass correlation, ranged from 0.47-0.71. CFA found good fit for the five-item adoption and implementation scales and resulted in revisions of the awareness and maintenance scales. The awareness scale was split into two two-item scales, representing community and agency awareness. The maintenance scale was split into five- and four-item scales, representing infrastructural maintenance and evaluation maintenance, respectively. Internal reliability of scales (Cronbach's α) ranged from 0.66-0.78. The model for the final revised scales approached good fit, with most factor loadings >0.6 and all >0.4. The lack of adequate measurement tools hinders progress in dissemination and implementation research. These preliminary results help fill this gap by describing the reliability and measurement properties of a theory-based tool; the short, user-friendly instrument may be useful to researchers and practitioners seeking to assess organizational readiness for EBIs across a variety of chronic disease prevention programs and settings.
Hamdi, Naser; Oweis, Rami; Abu Zraiq, Hamzeh; Abu Sammour, Denis
2012-04-01
The effective maintenance management of medical technology influences the quality of care delivered and the profitability of healthcare facilities. Medical equipment maintenance in Jordan lacks an objective prioritization system; consequently, the system is not sensitive to the impact of equipment downtime on patient morbidity and mortality. The current work presents a novel software system (EQUIMEDCOMP) that is designed to achieve valuable improvements in the maintenance management of medical technology. This work-order prioritization model sorts medical maintenance requests by calculating a priority index for each request. Model performance was assessed by utilizing maintenance requests from several Jordanian hospitals. The system proved highly efficient in minimizing equipment downtime based on healthcare delivery capacity, and, consequently, patient outcome. Additionally, a preventive maintenance optimization module and an equipment quality control system are incorporated. The system is, therefore, expected to improve the reliability of medical equipment and significantly improve safety and cost-efficiency.
Application and preventive maintenance of neurology medical equipment in isfahan alzahra hospital.
Alikhani, Parivash; Vesal, Sahar; Kashefi, Parviz; Pour, Ramin Etamadi; Khorvash, Fariborz; Askari, Gholamreza; Meamar, Rokhsareh
2013-05-01
Nowadays Medical equipment plays an important role in the treatment and in the medical education. Using outdated preventive maintenance (PM) system may cause problems in the cutting edge medical equipment, Nervous system disease's equipment (In diagnosis and treatment) which are crucial for every medical center. Based on above facts we focused on nervous system treat units' equipment and informed the supervisors and their colleagues about the latest equipment maintenance status and promoted methodical and correct method to be used for medical equipment maintenance. This research is an analytical descriptive and has been done on the base information from a particular time to past. We gathered our required information of 2009 from Alzahra Medical Center. We divided this research info 2 main phases. In the first phase, we picked out Neurosurgery and Neourology diseases medical equipment (diagnosis and therapy equipment) and in the second phase, we need to implement a methodical PM for every equipment. Research has shown that there are 19nervous system equipment in Alzahra Medical center, categorized in diagnostic (13 pcs), therapeutic (4 pcs) and diagnostic-therapeutic (2 pcs). As we declare in methods part of this research, we categorized medical equipment in Food and Drug Administration (FDA) segmentation. Capital-scarce equipment: Magnetic resonance imaging, Eco Doppler, Kamalaarak ultrasonic surgical aspirator, Stereotactic, computed tomography-scan, euroendoscope/vital-scarce equipment: Coblation, Sonoco, vaterjet/scarce equipment: Transcranial color Doppler, electroencephalogram, electromyography, surgical microscope. Survey of application and preventive maintenance of neurology medical equipment in Isfahan Alzahra hospital show there is no P.M system. Implementing a complete P.M system for this medical center is crucial to preventing cause problems for these medical equipment and decreasing maintenance costs and gaining uptime. Researchers of this article have tried to provide PM, use of texts, web and experts.
Alternative Fuels Data Center: Active Transit
: Active Transit on AddThis.com... More in this section... Idle Reduction Parts & Equipment Maintenance Reduction Parts & Equipment Maintenance Driving Behavior Fleet Rightsizing System Efficiency Locate
Alternative Fuels Data Center: Newsletters
Offers information on the development and maintenance of electric motors, drives, and related components Fuels Fuel Prices Conserve Fuel Idle Reduction Parts & Equipment Maintenance Driving Behavior Fleet
Multi-objective group scheduling optimization integrated with preventive maintenance
NASA Astrophysics Data System (ADS)
Liao, Wenzhu; Zhang, Xiufang; Jiang, Min
2017-11-01
This article proposes a single-machine-based integration model to meet the requirements of production scheduling and preventive maintenance in group production. To describe the production for identical/similar and different jobs, this integrated model considers the learning and forgetting effects. Based on machine degradation, the deterioration effect is also considered. Moreover, perfect maintenance and minimal repair are adopted in this integrated model. The multi-objective of minimizing total completion time and maintenance cost is taken to meet the dual requirements of delivery date and cost. Finally, a genetic algorithm is developed to solve this optimization model, and the computation results demonstrate that this integrated model is effective and reliable.
EERE: Alternative Fuels Data Center Home Page
facility safe with a first-of-its-kind CNG Maintenance Facility Modifications Handbook. Find Fleet & Equipment Maintenance Driving Behavior Fleet Rightsizing System Efficiency Locate Stations Search
High Reliability Engine Control Demonstrated for Aircraft Engines
NASA Technical Reports Server (NTRS)
Guo, Ten-Huei
1999-01-01
For a dual redundant-control system, which is typical for short-haul aircraft, if a failure is detected in a control sensor, the engine control is transferred to a safety mode and an advisory is issued for immediate maintenance action to replace the failed sensor. The safety mode typically results in severely degraded engine performance. The goal of the High Reliability Engine Control (HREC) program was to demonstrate that the neural-network-based sensor validation technology can safely operate an engine by using the nominal closed-loop control during and after sensor failures. With this technology, engine performance could be maintained, and the sensor could be replaced as a conveniently scheduled maintenance action.
2015-09-01
15 4. Commander, Naval Regional Maintenance Center .................. 15 5 . Private Ship Repair Industry...TURBINE EXHAUST SYSTEM MAINTENANCE STRATEGY FOR THE CG-47 TICONDEROGA CLASS CRUISER 5 . FUNDING NUMBERS 6. AUTHOR(S) Sparks, Robert D. 7. PERFORMING...condition-based maintenance, condition-directed, failure finding, fault tree analysis 15 . NUMBER OF PAGES 133 16. PRICE CODE 17. SECURITY
Alternative Fuels Data Center: Choice Environmental Services Chooses
been a hit with both drivers and maintenance staff. Drivers appreciate the reduction in diesel emissions while running their routes. Lower maintenance costs has also been an extremely pleasant surprise with the CNG trucks and found there is significantly less maintenance required on CNG trucks than on
NASA Astrophysics Data System (ADS)
Tamura, Yoshinobu; Yamada, Shigeru
OSS (open source software) systems which serve as key components of critical infrastructures in our social life are still ever-expanding now. Especially, embedded OSS systems have been gaining a lot of attention in the embedded system area, i.e., Android, BusyBox, TRON, etc. However, the poor handling of quality problem and customer support prohibit the progress of embedded OSS. Also, it is difficult for developers to assess the reliability and portability of embedded OSS on a single-board computer. In this paper, we propose a method of software reliability assessment based on flexible hazard rates for the embedded OSS. Also, we analyze actual data of software failure-occurrence time-intervals to show numerical examples of software reliability assessment for the embedded OSS. Moreover, we compare the proposed hazard rate model for the embedded OSS with the typical conventional hazard rate models by using the comparison criteria of goodness-of-fit. Furthermore, we discuss the optimal software release problem for the porting-phase based on the total expected software maintenance cost.
NASA Technical Reports Server (NTRS)
Shell, Elaine M.; Lue, Yvonne; Chu, Martha I.
1999-01-01
Flight software (FSW) is a mission critical element of spacecraft functionality and performance. When ground operations personnel interface to a spacecraft, they are dealing almost entirely with onboard software. This software, even more than ground/flight communications systems, is expected to perform perfectly at all times during all phases of on-orbit mission life. Due to the fact that FSW can be reconfigured and reprogrammed to accommodate new spacecraft conditions, the on-orbit FSW maintenance team is usually significantly responsible for the long-term success of a science mission. Failure of FSW can result in very expensive operations work-around costs and lost science opportunities. There are three basic approaches to staffing on-orbit software maintenance, namely: (1) using the original developers, (2) using mission operations personnel, or (3) assembling a Center of Excellence for multi-spacecraft on-orbit FSW support. This paper explains a National Aeronautics and Space Administration, Goddard Space Flight Center (NASA/GSFC) experience related to the roles of on-orbit FSW maintenance personnel. It identifies the advantages and disadvantages of each of the three approaches to staffing the FSW roles, and demonstrates how a cost efficient on-orbit FSW Maintenance Center of Excellence can be established and maintained with significant return on the investment.
The Virtual Xenbase: transitioning an online bioinformatics resource to a private cloud.
Karimi, Kamran; Vize, Peter D
2014-01-01
As a model organism database, Xenbase has been providing informatics and genomic data on Xenopus (Silurana) tropicalis and Xenopus laevis frogs for more than a decade. The Xenbase database contains curated, as well as community-contributed and automatically harvested literature, gene and genomic data. A GBrowse genome browser, a BLAST+ server and stock center support are available on the site. When this resource was first built, all software services and components in Xenbase ran on a single physical server, with inherent reliability, scalability and inter-dependence issues. Recent advances in networking and virtualization techniques allowed us to move Xenbase to a virtual environment, and more specifically to a private cloud. To do so we decoupled the different software services and components, such that each would run on a different virtual machine. In the process, we also upgraded many of the components. The resulting system is faster and more reliable. System maintenance is easier, as individual virtual machines can now be updated, backed up and changed independently. We are also experiencing more effective resource allocation and utilization. Database URL: www.xenbase.org. © The Author(s) 2014. Published by Oxford University Press.
Torque Production in a Halbach Machine
NASA Technical Reports Server (NTRS)
Eichenberg, Dennis J.; Gallo, Christopher A.; Thompson, William K.; Vrnak, Daniel R.
2006-01-01
The NASA John H. Glenn Research Center initiated the investigation of torque production in a Halbach machine for the Levitated Ducted Fan (LDF) Project to obtain empirical data in determining the feasibility of using a Halbach motor for the project. LDF is a breakthrough technology for "Electric Flight" with the development of a clean, quiet, electric propulsor system. Benefits include zero emissions, decreased dependence on fossil fuels, increased efficiency, increased reliability, reduced maintenance, and decreased operating noise levels. A commercial permanent magnet brushless motor rotor was tested with a custom stator. An innovative rotor utilizing a Halbach array was designed and developed to fit directly into the same stator. The magnets are oriented at 90deg to the adjacent magnet, which cancels the magnetic field on the inside of the rotor and strengthens the field on the outside of the rotor. A direct comparison of the commercial rotor and the Halbach rotor was made. In addition, various test models were designed and developed to validate the basic principles described, and the theoretical work that was performed. The report concludes that a Halbach array based motor can provide significant improvements in electric motor performance and reliability.
Gligorijevic, Jovan; Gajic, Dragoljub; Brkovic, Aleksandar; Savic-Gajic, Ivana; Georgieva, Olga; Di Gennaro, Stefano
2016-03-01
The packaging materials industry has already recognized the importance of Total Productive Maintenance as a system of proactive techniques for improving equipment reliability. Bearing faults, which often occur gradually, represent one of the foremost causes of failures in the industry. Therefore, detection of their faults in an early stage is quite important to assure reliable and efficient operation. We present a new automated technique for early fault detection and diagnosis in rolling-element bearings based on vibration signal analysis. Following the wavelet decomposition of vibration signals into a few sub-bands of interest, the standard deviation of obtained wavelet coefficients is extracted as a representative feature. Then, the feature space dimension is optimally reduced to two using scatter matrices. In the reduced two-dimensional feature space the fault detection and diagnosis is carried out by quadratic classifiers. Accuracy of the technique has been tested on four classes of the recorded vibrations signals, i.e., normal, with the fault of inner race, outer race, and ball operation. The overall accuracy of 98.9% has been achieved. The new technique can be used to support maintenance decision-making processes and, thus, to increase reliability and efficiency in the industry by preventing unexpected faulty operation of bearings.
Gligorijevic, Jovan; Gajic, Dragoljub; Brkovic, Aleksandar; Savic-Gajic, Ivana; Georgieva, Olga; Di Gennaro, Stefano
2016-01-01
The packaging materials industry has already recognized the importance of Total Productive Maintenance as a system of proactive techniques for improving equipment reliability. Bearing faults, which often occur gradually, represent one of the foremost causes of failures in the industry. Therefore, detection of their faults in an early stage is quite important to assure reliable and efficient operation. We present a new automated technique for early fault detection and diagnosis in rolling-element bearings based on vibration signal analysis. Following the wavelet decomposition of vibration signals into a few sub-bands of interest, the standard deviation of obtained wavelet coefficients is extracted as a representative feature. Then, the feature space dimension is optimally reduced to two using scatter matrices. In the reduced two-dimensional feature space the fault detection and diagnosis is carried out by quadratic classifiers. Accuracy of the technique has been tested on four classes of the recorded vibrations signals, i.e., normal, with the fault of inner race, outer race, and ball operation. The overall accuracy of 98.9% has been achieved. The new technique can be used to support maintenance decision-making processes and, thus, to increase reliability and efficiency in the industry by preventing unexpected faulty operation of bearings. PMID:26938541
Navy Leadership -- Chief of Naval Operations
Southwest Regional Maintenance Center (SWRMC) Mobile Innovation Center (MIC). The MIC is an additive manufacturing mobile training center where Sailors and Navy Team members can turn ideas into prototypes. SWRMC
Design and Application of the Exploration Maintainability Analysis Tool
NASA Technical Reports Server (NTRS)
Stromgren, Chel; Terry, Michelle; Crillo, William; Goodliff, Kandyce; Maxwell, Andrew
2012-01-01
Conducting human exploration missions beyond Low Earth Orbit (LEO) will present unique challenges in the areas of supportability and maintainability. The durations of proposed missions can be relatively long and re-supply of logistics, including maintenance and repair items, will be limited or non-existent. In addition, mass and volume constraints in the transportation system will limit the total amount of logistics that can be flown along with the crew. These constraints will require that new strategies be developed with regards to how spacecraft systems are designed and maintained. NASA is currently developing Design Reference Missions (DRMs) as an initial step in defining future human missions. These DRMs establish destinations and concepts of operation for future missions, and begin to define technology and capability requirements. Because of the unique supportability challenges, historical supportability data and models are not directly applicable for establishing requirements for beyond LEO missions. However, supportability requirements could have a major impact on the development of the DRMs. The mass, volume, and crew resources required to support the mission could all be first order drivers in the design of missions, elements, and operations. Therefore, there is a need for enhanced analysis capabilities to more accurately establish mass, volume, and time requirements for supporting beyond LEO missions. Additionally, as new technologies and operations are proposed to reduce these requirements, it is necessary to have accurate tools to evaluate the efficacy of those approaches. In order to improve the analysis of supportability requirements for beyond LEO missions, the Space Missions Analysis Branch at the NASA Langley Research Center is developing the Exploration Maintainability Analysis Tool (EMAT). This tool is a probabilistic simulator that evaluates the need for repair and maintenance activities during space missions and the logistics and crew requirements to support those activities. Using a Monte Carlo approach, the tool simulates potential failures in defined systems, based on established component reliabilities, and then evaluates the capability of the crew to repair those failures given a defined store of spares and maintenance items. Statistical analysis of Monte Carlo runs provides probabilistic estimates of overall mission safety and reliability. This paper will describe the operation of the EMAT, including historical data sources used to populate the model, simulation processes, and outputs. Analysis results are provided for a candidate exploration system, including baseline estimates of required sparing mass and volume. Sensitivity analysis regarding the effectiveness of proposed strategies to reduce mass and volume requirements and improve mission reliability is included in these results.
Aerojet advanced engine concept
NASA Technical Reports Server (NTRS)
Schoenman, L.
1984-01-01
The future orbit transfer vehicle (OTV) requirements which dictate the need for a highly versatile, highly reliable, reusable propulsion module are discussed. To attain maximum operational economy, space-basing is essential. This requires a reusable, maintenance free engine. The design features of this space based engine are defined. A new engine cycle and its advantages allow all the maintenance goals to be attained. Rubbing contact and interpropellant seals and purges are eliminated when GO2 is used to drive the LO2 pump. The TPA design has only one moving part. The use of both GH2 and GO2 to drive the turbines lowers the turbine temperatures in addition lower GH2 temperatures and pressures improve chamber cooling and longer life. The use of GO2 as a turbine drive fluid is addressed. Space based engines require an integrated control and health monitoring system to improve system reliability and eliminate all scheduled maintenance. It is concluded that all OTV propulsion requirements can be fulfilled with a single engine. The technological developments required to demonstrate that engine are outlined.
Research on Application of FMECA in Missile Equipment Maintenance Decision
NASA Astrophysics Data System (ADS)
Kun, Wang
2018-03-01
Fault mode effects and criticality analysis (FMECA) is a method widely used in engineering. Studying the application of FMEA technology in military equipment maintenance decision-making, can help us build a better equipment maintenance support system, and increase the using efficiency of weapons and equipment. Through Failure Modes, Effects and Criticality Analysis (FMECA) of equipment, known and potential failure modes and their causes are found out, and the influence on the equipment performance, operation success, personnel security are determined. Furthermore, according to the synthetical effects of the severity of effects and the failure probability, possible measures for prevention and correction are put forward. Through replacing or adjusting the corresponding parts, corresponding maintenance strategy is decided for preventive maintenance of equipment, which helps improve the equipment reliability.
2003-09-12
KENNEDY SPACE CENTER, FLA. - Workers, covered in protective clothing and breathing apparatus, continue sandblasting on the Mobile Launcher Platform on Launch Pad 39A to remove corrosion before repainting. Routine maintenance includes sandblasting and repainting as preventive means to minimize corrosion.
2003-09-12
KENNEDY SPACE CENTER, FLA. - On Launch Pad 39A, clouds of dust float away from the Mobile Launcher Platform, which is undergoing sandblasting to remove corrosion before repainting. Routine maintenance includes sandblasting and repainting as preventive means to minimize corrosion.
Reliability Practice at NASA Goddard Space Flight Center
NASA Technical Reports Server (NTRS)
Pruessner, Paula S.; Li, Ming
2008-01-01
This paper describes in brief the Reliability and Maintainability (R&M) Programs performed directly by the reliability branch at Goddard Space Flight Center (GSFC). The mission assurance requirements flow down is explained. GSFC practices for PRA, reliability prediction/fault tree analysis/reliability block diagram, FMEA, part stress and derating analysis, worst case analysis, trend analysis, limit life items are presented. Lessons learned are summarized and recommendations on improvement are identified.
A Proposed Approach for Prioritizing Maintenance at NASA Centers
NASA Technical Reports Server (NTRS)
Dunn, Steven C.; Sawyer, Melvin H.
2013-01-01
The National Aeronautics and Space Administration (NASA) manages a vast array of infrastructure assets across ten National Centers with a worth of at least 30 billion dollars. Eighty percent of this infrastructure is greater than 40 years old and is in degraded condition. Maintenance budgets are typically less than one percent of current replacement value (CRV), much less than the 2-4% recommended by the National Research Council. The maintenance backlog was 2.55 billion dollars in FY10 and growing. NASA s annual budgets have flattened and are at risk of being reduced, so the problem is becoming even more difficult. NASA Centers utilize various means to prioritize and accomplish maintenance within available budgets, though data is suspect and processes are variable. This paper offers a structured means to prioritize maintenance based on mission criticality and facility performance (ability of the facility to deliver on its purpose). Mission alignment is assessed using the current timeframe Mission Dependence Index and a measure of facility alignment with the 2011 NASA Strategic Plan for the long-term perspective. Facility performance is assessed by combining specific findings from a structured facility condition assessment and an assessment of actual functional output. These are then combined in a matrix to identify the facilities most critical to mission and able to deliver services. The purpose of this approach is to provide the best benefits for the available funding. Additionally, this rationale can also be applied to the prioritization of investment (recapitalization) projects so that the ultimate customers of this paper, the senior infrastructure managers at each NASA Center, are better able to strategically manage their capabilities.
ISS ECLSS: 3 Years of Logistics for Maintenance
NASA Technical Reports Server (NTRS)
Shkedi, Brienne; Thompson, Dean
2004-01-01
The International Space Station (ISS) Environmental Control and Life Support System (ECLSS) is designed to be maintainable. During the 3 years since the ISS US Lab became operational, there have been numerous ECLSS Orbital Replacement Units (ORUs) launched and returned to Maintain the ECLSS operation in the US segments. The maintenance logistics have provided tools for maintenance, replaced limited life ORUs and failed ORUs, upgraded ECLSS hardware to improve reliability and placed critical spares onboard prior to need. In most cases, the removed ORUs have been returned for either failure analysis and repair or refurbishment. This paper describes the ECLSS manifesting history and maintenance events and quantifies the numbers of ECLSS items, weights, and volumes.
[Reliability of a positron emission tomography system (CTI:PT931/04-12)].
Watanuki, Shoichi; Ishii, Keizo; Itoh, Masatoshi; Orihara, Hikonojyo
2002-05-01
The maintenance data of a PET system (PT931/04-12 CTI Inc.) was analyzed to evaluate its reliability. We examined whether the initial performance for the system resolution and efficiency is kept. The reliability of the PET system was evaluated from the value of MTTF (mean time to failure) and MTBF (mean time between failures) for each part of the system obtained from the maintenance data for 13 years. The initial performance was kept for the resolution, but the efficiency decreased to 72% of the initial value. The 83% of the troubles of the system was for detector block (DB) and DB control module (BC). The MTTF of DB and BC were 2,733 and 3,314 days, and the MTBF of DB and BC per detector ring were 38 and 114 days. The MTBF of the system was 23 days. We found seasonal dependence for the number of troubles of DB and BC. This means that the trouble may be related the humidity. The reliability of the PET system strongly depends on the MTBF of DB and BC. The improvement in quality of these parts and optimization of the environment in operation may increase the reliability of the PET system. For the popularization of PET, it is effective to evaluate the reliability of the system and to show it to the users.
Integration and testing of a multistack automated cone machine
DOT National Transportation Integrated Search
2004-06-01
The Advanced Highway Maintenance and Construction Technology (AHMCT) Research Center has been developing robotic equipment and machinery for highway maintenance and construction operations. It is a cooperative venture between the University of Califo...
Cryogenics maintenance strategy
NASA Astrophysics Data System (ADS)
Cruzat, Fabiola
2012-09-01
ALMA is an interferometer composed of 66 independent systems, with specific maintenance requirements for each subsystem. To optimize the observation time and reduce downtime maintenance, requirements are very demanding. One subsystem with high maintenance efforts is cryogenics and vacuum. To organize the maintenance, the Cryogenic and Vacuum department is using and implementing different tools. These are monitoring and problem reporting systems and CMMS. This leads to different maintenance approaches: Preventive Maintenance, Corrective Maintenance and Condition Based Maintenance. In order to coordinate activities with other departments the preventive maintenance schedule is kept as flexible as systems allow. To cope with unavoidable failures, the team has to be prepared to work under any condition with the spares on time. Computerized maintenance management system (CMMS) will help to manage inventory control for reliable spare part handling, the correct record of work orders and traceability of maintenance activities. For an optimized approach the department is currently evaluating where preventive or condition based maintenance applies to comply with the individual system demand. Considering the change from maintenance contracts to in-house maintenance will help to minimize costs and increase availability of parts. Due to increased number of system and tasks the cryo team needs to grow. Training of all staff members is mandatory, in depth knowledge must be built up by doing complex maintenance activities in the Cryo group, use of advanced computerized metrology systems.
Beck, Arne; Bergman, David A; Rahm, Alanna K; Dearing, James W; Glasgow, Russell E
2009-01-01
We describe here the use of a conceptual framework for implementing and disseminating in a Health Maintenance Organization an evidence-based model of well-child care (WCC) that includes developmental and preventive services recommended by the American Academy of Pediatrics. Twenty-first Century WCC is a parent-centered, team-based, primary care model that combines online previsit assessments—completed by parents and caregivers regarding clinic-based weight, growth, and development assessments—with vaccinations and anticipatory guidance. Nurses, nurse practitioners, developmental specialists, and pediatricians all play roles in the WCC model. Patient and clinician interaction, health records, and resources are all facilitated through a Web-based diagnostic, management, tracking, and resource information tool. Implementation and dissemination concepts and their attendant practices and tools can reliably be used to augment strategic decisions about how to best disseminate and implement innovations in health care delivery. Unlike innovations that are embedded only in technical systems, validated models of team-based health care have multiple components that must be made compatible with complex sociotechnical systems. Interpersonal communication, work, coordination, and judgment are key processes that affect implementation quality. Implementation can involve tailoring to a particular site and customizing either the model or the organizational context to accommodate it. PMID:20740083
Cost-Cutting Powdered Lubricant
NASA Technical Reports Server (NTRS)
2005-01-01
Scientists at NASA's Glenn Research Center developed a high-temperature, solid lubricant coating material that is saving the manufacturing industry millions of dollars. The material came out of 3 decades of tribological research, work studying high-temperature friction, lubrication, and the wearing of interacting surfaces that are in relative motion. It was developed as a shaft coating deposited by thermal spraying to protect foil air bearings used in oil-free turbomachinery, like gas turbines, and is meant to be part of a larger project: an oil-free aircraft engine capable of operating at high temperatures with increased reliability, lowered weight, reduced maintenance requirements, and increased power. This advanced coating, PS300, is a self-lubricating bearing material containing chromium oxide, with additions of a low-temperature start up lubricant (silver) and a high-temperature lubricant, making it remarkably stable at high temperatures, and better suited than previously available materials for high-stress conditions. It improves efficiency, lowers friction, reduces emissions, and has been used by NASA in advanced aeropropulsion engines, refrigeration compressors, turbochargers, and hybrid electrical turbogenerators. PS300 is ideal in any application where lowered weight and reduced maintenance are desired, and high-temperature uses and heavy operating speeds are expected. It has notable uses for the Space Agency, but it has even further-reaching potential for the industrial realm.
Opportunities and strategies to further reduce animal use for Leptospira vaccine potency testing.
Walker, A; Srinivas, G B
2013-09-01
Hamsters are routinely infected with virulent Leptospira for two purposes in the regulation of biologics: the performance of Codified potency tests and maintenance of challenge culture for the Codified potency tests. Options for reducing animal use in these processes were explored in a plenary lecture at the "International Workshop on Alternative Methods for Leptospira Vaccine Potency Testing: State of the Science and the Way Forward" held at the Center for Veterinary Biologics in September 2012. The use of validated in vitro potency assays such as those developed by the U.S. Department of Agriculture for Leptospira (L.) canicola, Leptospira grippotyphosa, Leptospira pomona, and Leptospira icterohaemorrhagiae rather than the Codified hamster vaccination-challenge assay was encouraged. Alternatives such as reduced animal numbers in the hamster vaccination-challenge testing were considered for problematic situations. Specifically, the merits of sharing challenge controls, reducing group sizes, and eliminating animals for concurrent challenge dose titration were assessed. Options for maintaining virulent, stable cultures without serial passage through hamsters or with decreased hamster use were also discussed. The maintenance of virulent Leptospira without the use of live animals is especially difficult since a reliable means to maintain virulence after multiple in vitro passages has not yet been identified. Published by Elsevier Ltd.
Life Support Filtration System Trade Study for Deep Space Missions
NASA Technical Reports Server (NTRS)
Agui, Juan H.; Perry, Jay L.
2017-01-01
The National Aeronautics and Space Administrations (NASA) technical developments for highly reliable life support systems aim to maximize the viability of long duration deep space missions. Among the life support system functions, airborne particulate matter filtration is a significant driver of launch mass because of the large geometry required to provide adequate filtration performance and because of the number of replacement filters needed to a sustain a mission. A trade analysis incorporating various launch, operational and maintenance parameters was conducted to investigate the trade-offs between the various particulate matter filtration configurations. In addition to typical launch parameters such as mass, volume and power, the amount of crew time dedicated to system maintenance becomes an increasingly crucial factor for long duration missions. The trade analysis evaluated these parameters for conventional particulate matter filtration technologies and a new multi-stage particulate matter filtration system under development by NASAs Glenn Research Center. The multi-stage filtration system features modular components that allow for physical configuration flexibility. Specifically, the filtration system components can be configured in distributed, centralized, and hybrid physical layouts that can result in considerable mass savings compared to conventional particulate matter filtration technologies. The trade analysis results are presented and implications for future transit and surface missions are discussed.
Low Voltage Electrolytic Capacitor Pulse Forming Inductive Network for Electric Weapons
2006-06-01
reliable high- current, high-energy pulses of many megawatts. Pulsed alternators potentially have the same maintenance issues as other motor ...high-energy pulses of many megawatts. Pulsed alternators potentially have the same maintenance issues as other motor -generator sets, so a solid...Rotating Flywheel) Pulse Forming Network Compensated Pulsed Alternators, or Compulsators as they are called, are essentially large motor -generator
Optimal Preventive Maintenance Schedule based on Lifecycle Cost and Time-Dependent Reliability
2011-11-10
Page 1 of 16 UNCLASSIFIED: Distribution Statement A. Approved for public release. 12IDM-0064 Optimal Preventive Maintenance Schedule based... 1 . INTRODUCTION Customers and product manufacturers demand continued functionality of complex equipment and processes. Degradation of material...Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response
A Review of Software Maintenance Technology.
1980-02-01
LABS HONEYWELL, REF BURROUGHS, OTHERS BOOLE £ LANGUAGE "PE BABBAGE , OPERATIONAL INDEPENDENT 4.2.17 INC. IBM H M RELIABILITY MOST LARGE U. MEASUREMENT...80-13 ML llluuluunuuuuu SmeeI..... f. Maintenance Experience (1) Multiple Implementation Charles Holmes (Source 2) described two attempts at McDonnell...proprietary software monitor package distributed by Boole and Babbage , Inc., Sunnyvale, California. it has been implemented on IBM computers and is language
Analysis of C-17 Departure Reliability and Maintenance Metrics
2010-06-01
Washington DC: AFDPO. Anderson, D. R., Sweeney, D. J ., & Williams, T. A . (2008). Statisitcs for Business and Economics. Mason: South-Western...Cengage Learning. Capehart, S. R. (2010, January 21). Major Vincent M Jacobs GRP. (V. M. Jacobs, Interviewer) Coyle, J . C., Bardi , E. J ., & Novack, R...Background Maintenance management metrics—sometimes called quality performance measures or indicators—are a crucial form of information used by
Design of fuel cell powered data centers for sufficient reliability and availability
NASA Astrophysics Data System (ADS)
Ritchie, Alexa J.; Brouwer, Jacob
2018-04-01
It is challenging to design a sufficiently reliable fuel cell electrical system for use in data centers, which require 99.9999% uptime. Such a system could lower emissions and increase data center efficiency, but the reliability and availability of such a system must be analyzed and understood. Currently, extensive backup equipment is used to ensure electricity availability. The proposed design alternative uses multiple fuel cell systems each supporting a small number of servers to eliminate backup power equipment provided the fuel cell design has sufficient reliability and availability. Potential system designs are explored for the entire data center and for individual fuel cells. Reliability block diagram analysis of the fuel cell systems was accomplished to understand the reliability of the systems without repair or redundant technologies. From this analysis, it was apparent that redundant components would be necessary. A program was written in MATLAB to show that the desired system reliability could be achieved by a combination of parallel components, regardless of the number of additional components needed. Having shown that the desired reliability was achievable through some combination of components, a dynamic programming analysis was undertaken to assess the ideal allocation of parallel components.
Reliability Evaluation of Machine Center Components Based on Cascading Failure Analysis
NASA Astrophysics Data System (ADS)
Zhang, Ying-Zhi; Liu, Jin-Tong; Shen, Gui-Xiang; Long, Zhe; Sun, Shu-Guang
2017-07-01
In order to rectify the problems that the component reliability model exhibits deviation, and the evaluation result is low due to the overlook of failure propagation in traditional reliability evaluation of machine center components, a new reliability evaluation method based on cascading failure analysis and the failure influenced degree assessment is proposed. A direct graph model of cascading failure among components is established according to cascading failure mechanism analysis and graph theory. The failure influenced degrees of the system components are assessed by the adjacency matrix and its transposition, combined with the Pagerank algorithm. Based on the comprehensive failure probability function and total probability formula, the inherent failure probability function is determined to realize the reliability evaluation of the system components. Finally, the method is applied to a machine center, it shows the following: 1) The reliability evaluation values of the proposed method are at least 2.5% higher than those of the traditional method; 2) The difference between the comprehensive and inherent reliability of the system component presents a positive correlation with the failure influenced degree of the system component, which provides a theoretical basis for reliability allocation of machine center system.
Alternative Fuels Data Center: Hydraulic Hybrids: A Success in Ann Arbor
off with fuel savings, lower maintenance costs, and increased productivity. American Recovery and regenerative braking system also means huge savings in brake maintenance. Normally, a truck that stops and
Development of vegetation cutting tool attachments for the automated roadway debris vacuums.
DOT National Transportation Integrated Search
2008-12-01
The Advanced Highway Maintenance and Construction Technology (AHMCT) Research Center has been : developing robotic equipment and machinery for highway maintenance and construction operations. It is a : cooperative venture between the University of Ca...
Research notes : improving maintenance practices.
DOT National Transportation Integrated Search
2001-03-01
Last summer, the ODOT Research Group and Technology Transfer (T2) Center funded a four-month trial of a piece of shoulder maintenance equipment called The Retriever. Research staff also inspected a berm shaper developed by District 3 crews. : T...
Developing a comprehensive training curriculum for integrated predictive maintenance
NASA Astrophysics Data System (ADS)
Wurzbach, Richard N.
2002-03-01
On-line equipment condition monitoring is a critical component of the world-class production and safety histories of many successful nuclear plant operators. From addressing availability and operability concerns of nuclear safety-related equipment to increasing profitability through support system reliability and reduced maintenance costs, Predictive Maintenance programs have increasingly become a vital contribution to the maintenance and operation decisions of nuclear facilities. In recent years, significant advancements have been made in the quality and portability of many of the instruments being used, and software improvements have been made as well. However, the single most influential component of the success of these programs is the impact of a trained and experienced team of personnel putting this technology to work. Changes in the nature of the power generation industry brought on by competition, mergers, and acquisitions, has taken the historically stable personnel environment of power generation and created a very dynamic situation. As a result, many facilities have seen a significant turnover in personnel in key positions, including predictive maintenance personnel. It has become the challenge for many nuclear operators to maintain the consistent contribution of quality data and information from predictive maintenance that has become important in the overall equipment decision process. These challenges can be met through the implementation of quality training to predictive maintenance personnel and regular updating and re-certification of key technology holders. The use of data management tools and services aid in the sharing of information across sites within an operating company, and with experts who can contribute value-added data management and analysis. The overall effectiveness of predictive maintenance programs can be improved through the incorporation of newly developed comprehensive technology training courses. These courses address the use of key technologies such as vibration analysis, infrared thermography, and oil analysis not as singular entities, but as a toolbox resource from which to address overall equipment and plant reliability in a structured program and decision environment.
Development and Testing of a Prototype Grid-Tied Photovoltaic Power System
NASA Technical Reports Server (NTRS)
Eichenberg, Dennis J.
2009-01-01
The NASA Glenn Research Center (GRC) has developed and tested a prototype 2 kW DC grid-tied photovoltaic (PV) power system at the Center. The PV system has generated in excess of 6700 kWh since operation commenced in July 2006. The PV system is providing power to the GRC grid for use by all. Operation of the prototype PV system has been completely trouble free. A grid-tied PV power system is connected directly to the utility distribution grid. Facility power can be obtained from the utility system as normal. The PV system is synchronized with the utility system to provide power for the facility, and excess power is provided to the utility. The project transfers space technology to terrestrial use via nontraditional partners. GRC personnel glean valuable experience with PV power systems that are directly applicable to various space power systems, and provide valuable space program test data. PV power systems help to reduce harmful emissions and reduce the Nation s dependence on fossil fuels. Power generated by the PV system reduces the GRC utility demand, and the surplus power aids the community. Present global energy concerns reinforce the need for the development of alternative energy systems. Modern PV panels are readily available, reliable, efficient, and economical with a life expectancy of at least 25 years. Modern electronics has been the enabling technology behind grid-tied power systems, making them safe, reliable, efficient, and economical with a life expectancy of at least 25 years. Based upon the success of the prototype PV system, additional PV power system expansion at GRC is under consideration. The prototype grid-tied PV power system was successfully designed and developed which served to validate the basic principles described, and the theoretical work that was performed. The report concludes that grid-tied photovoltaic power systems are reliable, maintenance free, long life power systems, and are of significant value to NASA and the community.
What Medical Directors Need to Know about Dialysis Facility Water Management.
Kasparek, Ted; Rodriguez, Oscar E
2015-06-05
The medical directors of dialysis facilities have many operational clinic responsibilities, which on first glance, may seem outside the realm of excellence in patient care. However, a smoothly running clinic is integral to positive patient outcomes. Of the conditions for coverage outlined by the Centers for Medicare and Medicaid Services, one most critical to quality dialysis treatment is the provision of safe purified dialysis water, because there are many published instances where clinic failure in this regard has resulted in patient harm. As the clinical leader of the facility, the medical director is obliged to have knowledge of his/her facility's water treatment system to reliably ensure that the purified water used in dialysis will meet the standards for quality set by the Association for the Advancement of Medical Instrumentation and used by the Centers for Medicare and Medicaid Services for conditions for coverage. The methods used to both achieve and maintain these quality standards should be a part of quality assessment and performance improvement program meetings. The steps for water treatment, which include pretreatment, purification, and distribution, are largely the same, regardless of the system used. Each water treatment system component has a specific role in the process and requires individualized maintenance and monitoring. The medical director should provide leadership by being engaged with the process, knowing the facility's source water, and understanding water treatment system operation as well as the clinical significance of system failure. Successful provision of quality water will be achieved by those medical directors who learn, know, and embrace the requirements of dialysis water purification and system maintenance. Copyright © 2015 by the American Society of Nephrology.
Rosenberg, Rebecca E; Devins, Lea; Geraghty, Gail; Bock, Steven; Dugan, Christina A; Transou, Marjorie; Phillips, Michael; Lighter-Fisher, Jennifer
2015-10-01
Central venous catheters are crucial devices in the care of hospitalized children, both in and out of critical care units, but the concomitant risk of central line-associated bloodstream infection (CLABSI) affects 15,000 Americans annually. In 2012, CLABSI rates varied among units from 6.8/1,000 to 1.0/1,000 in a 109-bed children's service within NYU Langone Medical Center (NYULMC; New York City), a 1,069-bed tertiary care academic medical center. In response to variation in central line-related practices and infection prevention rates, a CLABSI Prevention Core Team began an effort to standardize central venous catheter (CVC) care across all pediatric units (ICU and non-ICU). Momentum in this quality improvement (QI) work was interrupted when Superstorm Sandy shuttered the flagship hospital, but the relatively decreased clinical load provided a "downtime" opportunity to address CLABSI prevention. The first phase of the collaborative effort, Booster 1, Planning/Initial Phase: Development of a Pediatric Central Venous Catheter Working Group, was followed by Booster 2, Maintenance/Sustaining Phase: Transitioning for Sustainability and Adopting Model for Improvement. Data in the subsequent 21 months after the temporary closure of the facility (January 2013-September 2014) showed an increase in maintenance bundle reliability. The inpatient CLABSI rate for patients<18 years decreased from an annual rate of 2.7/1,000 line days (2012) to 0.6/1,000 line days (2013) to 0.5/1,000 line days as of August 2014. There was a decrease in pediatric CLABSI events and no significant change in line days. Key elements contributing to initial success with evolving QI capacity and resources were likely multi-factorial, including staff and leadership engagement, culture change, consistent guidelines, and accountability by individuals and by our multidisciplinary core team.
Space and Missile Systems Center Standard: Software Development
2015-01-16
maintenance , or any other activity or combination of activities resulting in products . Within this standard, requirements to “develop,” “define...integration, reuse, reengineering, maintenance , or any other activity that results in products ). The term “developer” encompasses all software team...activities that results in software products . Software development includes new development, modification, reuse, reengineering, maintenance , and any other
77 FR 8877 - ICD-9-CM Coordination and Maintenance (C&M) Committee Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-15
... Coordination and Maintenance (C&M) Committee Meeting National Center for Health Statistics (NCHS... Coordination and Maintenance (C&M) Committee meeting. Time and Date: 9 a.m.-5:30 p.m., March 5, 2012. Place... entering the building. Attendees who wish to attend the ICD- 9-CM C&M meeting on March 5, 2012, must submit...
Detailed requirements document for the Interactive Financial Management System (IFMS), volume 1
NASA Technical Reports Server (NTRS)
Dodson, D. B.
1975-01-01
The detailed requirements for phase 1 (online fund control, subauthorization accounting, and accounts receivable functional capabilities) of the Interactive Financial Management System (IFMS) are described. This includes information on the following: systems requirements, performance requirements, test requirements, and production implementation. Most of the work is centered on systems requirements, and includes discussions on the following processes: resources authority, allotment, primary work authorization, reimbursable order acceptance, purchase request, obligation, cost accrual, cost distribution, disbursement, subauthorization performance, travel, accounts receivable, payroll, property, edit table maintenance, end-of-year, backup input. Other subjects covered include: external systems interfaces, general inquiries, general report requirements, communication requirements, and miscellaneous. Subjects covered under performance requirements include: response time, processing volumes, system reliability, and accuracy. Under test requirements come test data sources, general test approach, and acceptance criteria. Under production implementation come data base establishment, operational stages, and operational requirements.
Using the stages of change model to counsel victims of intimate partner violence.
Frasier, P Y; Slatt, L; Kowlowitz, V; Glowa, P T
2001-05-01
Medical expenses from intimate partner violence (IPV) total between $3 and $5 billion annually. Many abuse victims are exposed to serious injuries, and are likely to see their physicians more frequently than other patients. Practitioners must have a reliable and realistic approach to counseling patients who are victims of IPV. This paper presents the stages of change model as a practical guide for counseling victims. Through patients' responses to a series of questions, the practitioner can identify which of five stages of change (precontemplation, preparation, contemplation, action, maintenance) the patient is in. The practitioner can then employ stage-specific strategies for counseling the patient. Using this model shifts the definition of successful outcome from the traditional focus of trying to 'fix the problem' to a patient-centered focus, working with the patient to explore the most effective strategies given his/her stage of change.
An expert system executive for automated assembly of large space truss structures
NASA Technical Reports Server (NTRS)
Allen, Cheryl L.
1993-01-01
Langley Research Center developed a unique test bed for investigating the practical problems associated with the assembly of large space truss structures using robotic manipulators. The test bed is the result of an interdisciplinary effort that encompasses the full spectrum of assembly problems - from the design of mechanisms to the development of software. The automated structures assembly test bed and its operation are described, the expert system executive and its development are detailed, and the planned system evolution is discussed. Emphasis is on the expert system implementation of the program executive. The executive program must direct and reliably perform complex assembly tasks with the flexibility to recover from realistic system errors. The employment of an expert system permits information that pertains to the operation of the system to be encapsulated concisely within a knowledge base. This consolidation substantially reduced code, increased flexibility, eased software upgrades, and realized a savings in software maintenance costs.
Improving Therapeutic Relationships: Joint Crisis Planning for Individuals With Psychotic Disorders.
Farrelly, Simone; Lester, Helen; Rose, Diana; Birchwood, Max; Marshall, Max; Waheed, Waquas; Henderson, R Claire; Szmukler, George; Thornicroft, Graham
2015-12-01
Outcomes for individuals with psychosis remain far from acceptable. Recently, prominent psychiatrists have called for an improved understanding of the impact of social contexts, and how social contexts might influence the development and maintenance of mental health problems. A key social context for individuals with psychosis is the therapeutic relationship. As part of a trial of joint crisis planning in England, this qualitative study aimed to determine the mechanism through which joint crisis planning might affect the therapeutic relationship. Results suggest that routine processes in mental health care are affected by policy and organizational requirements for risk mitigation-aspects that undermine person-centered approaches. In contrast, strong therapeutic relationships are characterized by individualized care and reliable and respectful treatment. The Joint Crisis Plan intervention partially succeeded in reducing contextual influences on routine role enactments, facilitating the demonstration of respect and improving the therapeutic relationship. © The Author(s) 2015.
Lock hopper values for coal gasification plant service
NASA Technical Reports Server (NTRS)
Schoeneweis, E. F.
1977-01-01
Although the operating principle of the lock hopper system is extremely simple, valve applications involving this service for coal gasification plants are likewise extremely difficult. The difficulties center on the requirement of handling highly erosive pulverized coal or char (either in dry or slurry form) combined with the requirement of providing tight sealing against high-pressure (possibly very hot) gas. Operating pressures and temperatures in these applications typically range up to 1600 psi (110bar) and 600F (316C), with certain process requirements going even higher. In addition, and of primary concern, is the need for reliable operation over long service periods with the provision for practical and economical maintenance. Currently available data indicate the requirement for something in the order of 20,000 to 30,000 open-close cycles per year and a desire to operate at least that long without valve failure.
NASA Technical Reports Server (NTRS)
Thesken, John C.; Bowman, Cheryl L.; Arnold, Steven M.
2003-01-01
Successful spaceflight operations require onboard power management systems that reliably achieve mission objectives for a minimal launch weight. Because of their high specific energies and potential for reduced maintenance and logistics, composite flywheels are an attractive alternative to electrochemical batteries. The Rotor Durability Team, which comprises members from the Ohio Aerospace Institute (OAI) and the NASA Glenn Research Center, completed a program of elevated temperature testing at Glenn' s Life Prediction Branch's Fatigue Laboratory. The experiments provided unique design data essential to the safety and durability of flywheel energy storage systems for the International Space Station and other manned spaceflight applications. Analysis of the experimental data (ref. 1) demonstrated that the compressive stress relaxation of composite flywheel rotor material is significantly greater than the commonly available tensile stress relaxation data. Durability analysis of compression preloaded flywheel rotors is required for accurate safe-life predictions for use in the International Space Station.
The cost of starting and maintaining a large home hemodialysis program.
Komenda, Paul; Copland, Michael; Makwana, Jay; Djurdjev, Ogdjenka; Sood, Manish M; Levin, Adeera
2010-06-01
Home extended hours hemodialysis improves some measurable biological and quality-of-life parameters over conventional renal replacement therapies in patients with end-stage renal disease. Published small studies evaluating costs have shown savings in terms of ongoing operating costs with this modality. However, all estimates need to include the total costs, including infrastructure, patient training, and maintenance; patient attrition by death, transplantation, technique failure; and the necessity of in-center dialysis. We describe a comprehensive funding model for a large centrally administered but locally delivered home hemodialysis program in British Columbia, Canada that covered 122 patients, of which 113 were still in the program at study end. The majority of patients performed home nocturnal hemodialysis in this 2-year retrospective study. All training periods, both in-center and in-home dialysis, medications, hospitalizations, and deaths were captured using our provincial renal database and vital statistics. Comparative data from the provincial database and pricing models were used for costing purposes. The total comprehensive costs per patient-incorporating startup, home, and in-center dialysis; medications; home remodeling; and consumables-was $59,179 for years 2004-2005 and $48,648 for 2005-2006. The home dialysis patients required multiple in-center dialysis runs, significantly contributing to the overall costs. Our study describes a valid, comprehensive funding model delineating reliable cost estimates of starting and maintaining a large home-based hemodialysis program. Consideration of hidden costs is important for administrators and planners to take into account when designing budgets for home hemodialysis.
Virtual and flexible digital signal processing system based on software PnP and component works
NASA Astrophysics Data System (ADS)
He, Tao; Wu, Qinghua; Zhong, Fei; Li, Wei
2005-05-01
An idea about software PnP (Plug & Play) is put forward according to the hardware PnP. And base on this idea, a virtual flexible digital signal processing system (FVDSPS) is carried out. FVDSPS is composed of a main control center, many sub-function modules and other hardware I/O modules. Main control center sends out commands to sub-function modules, and manages running orders, parameters and results of sub-functions. The software kernel of FVDSPS is DSP (Digital Signal Processing) module, which communicates with the main control center through some protocols, accept commands or send requirements. The data sharing and exchanging between the main control center and the DSP modules are carried out and managed by the files system of the Windows Operation System through the effective communication. FVDSPS real orients objects, orients engineers and orients engineering problems. With FVDSPS, users can freely plug and play, and fast reconfigure a signal process system according to engineering problems without programming. What you see is what you get. Thus, an engineer can orient engineering problems directly, pay more attention to engineering problems, and promote the flexibility, reliability and veracity of testing system. Because FVDSPS orients TCP/IP protocol, through Internet, testing engineers, technology experts can be connected freely without space. Engineering problems can be resolved fast and effectively. FVDSPS can be used in many fields such as instruments and meter, fault diagnosis, device maintenance and quality control.
Building a maintenance policy through a multi-criterion decision-making model
NASA Astrophysics Data System (ADS)
Faghihinia, Elahe; Mollaverdi, Naser
2012-08-01
A major competitive advantage of production and service systems is establishing a proper maintenance policy. Therefore, maintenance managers should make maintenance decisions that best fit their systems. Multi-criterion decision-making methods can take into account a number of aspects associated with the competitiveness factors of a system. This paper presents a multi-criterion decision-aided maintenance model with three criteria that have more influence on decision making: reliability, maintenance cost, and maintenance downtime. The Bayesian approach has been applied to confront maintenance failure data shortage. Therefore, the model seeks to make the best compromise between these three criteria and establish replacement intervals using Preference Ranking Organization Method for Enrichment Evaluation (PROMETHEE II), integrating the Bayesian approach with regard to the preference of the decision maker to the problem. Finally, using a numerical application, the model has been illustrated, and for a visual realization and an illustrative sensitivity analysis, PROMETHEE GAIA (the visual interactive module) has been used. Use of PROMETHEE II and PROMETHEE GAIA has been made with Decision Lab software. A sensitivity analysis has been made to verify the robustness of certain parameters of the model.
2015-03-21
3 Navy Depot Maintenance Strategic Plan (2014– 2019 ... Tech Center in-sourcing initiative saves between $52 and $203 million in data system costs over the life of the project. The Army claims in...maintenance budgets at the DOD and the Navy are highlighted, and the Navy Depot Maintenance Strategic Plan (2014– 2019 ) is introduced. The Problem
Space station orbit maintenance
NASA Technical Reports Server (NTRS)
Kaplan, D. I.; Jones, R. M.
1983-01-01
The orbit maintenance problem is examined for two low-earth-orbiting space station concepts - the large, manned Space Operations Center (SOC) and the smaller, unmanned Science and Applications Space Platform (SASP). Atmospheric drag forces are calculated, and circular orbit altitudes are selected to assure a 90 day decay period in the event of catastrophic propulsion system failure. Several thrusting strategies for orbit maintenance are discussed. Various chemical and electric propulsion systems for orbit maintenance are compared on the basis of propellant resupply requirements, power requirements, Shuttle launch costs, and technology readiness.
NASA Astrophysics Data System (ADS)
Siswanto, A.; Kurniati, N.
2018-04-01
An oil and gas company has 2,268 oil and gas wells. Well Barrier Element (WBE) is installed in a well to protect human, prevent asset damage and minimize harm to the environment. The primary WBE component is Surface Controlled Subsurface Safety Valve (SCSSV). The secondary WBE component is Christmas Tree Valves that consist of four valves i.e. Lower Master Valve (LMV), Upper Master Valve (UMV), Swab Valve (SV) and Wing Valve (WV). Current practice on WBE Preventive Maintenance (PM) program is conducted by considering the suggested schedule as stated on manual. Corrective Maintenance (CM) program is conducted when the component fails unexpectedly. Both PM and CM need cost and may cause production loss. This paper attempts to analyze the failure data and reliability based on historical data. Optimal PM interval is determined in order to minimize the total cost of maintenance per unit time. The optimal PM interval for SCSSV is 730 days, LMV is 985 days, UMV is 910 days, SV is 900 days and WV is 780 days. In average of all components, the cost reduction by implementing the suggested interval is 52%, while the reliability is improved by 4% and the availability is increased by 5%.
ERIC Educational Resources Information Center
Czuchry, Andrew J.; And Others
This report provides a complete guide to the stand alone mode operation of the reliability and maintenance (R&M) model, which was developed to facilitate the performance of design versus cost trade-offs within the digital avionics information system (DAIS) acquisition process. The features and structure of the model, its input data…
Report on the Audit of Performnce and Reliability of Cobra Helicopter Rotor Blades
1991-05-21
We are providing this final report for your information and use. The audit was made from January to March 1991. The audit objective was to evaluate...internal controls. The audit was made in response to concerns raised by personnel at the Sharpe Army Depot about the K747 blade’s performance, maintenance, and reliability.
Missile Systems Maintenance, AFSC 411XOB/C.
1988-04-01
technician’s rating. A statistical measurement of their agreement, known as the interrater reliability (as assessed through components of variance of...senior technician’s ratings. A statistical measurement of their agreement, known as the interrater reliability (as assessed through components of...FABRICATION TRANSITORS *INPUT/OUTPUT (PERIPHERAL) DEVICES SOLID-STATE SPECIAL PURPOSE DEVICES COMPUTER MICRO PROCESSORS AND PROGRAMS POWER SUPPLIES
Project Plan 7930 Cell G PaR Remote Handling System Replacement
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kinney, Kathryn A
2009-10-01
For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ({sup 252}Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for {sup 252}Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for {sup 252}Cf processing in Building 7930, Cell G require use of through-the-wall manipulatorsmore » and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully functioning and reliable Par manipulator arm is necessary for uninterrupted {sup 252}Cf operations; a fully-functioning bridge is needed for the system to function as intended.« less
76 FR 23801 - North American Electric Reliability Corporation; Order Approving Reliability Standard
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-28
... primary control functionality. Nonetheless, until data from drills, exercises and tests can support a... control center becomes inoperable and to conduct reviews and tests, at least annually, to ensure viability... Preparedness and Operations (EOP) Reliability Standard EOP- 008-1 (Loss of Control Center Functionality). The...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hatchell, Brian K.; Mauss, Fredrick J.; Santiago-Rojas, Emiliano
Military missiles are exposed to many sources of mechanical vibration that can affect system reliability, safety, and mission effectiveness. One of the most significant exposures to vibration occurs when the missile is being carried by an aviation platform, which is a condition known as captive carry. If the duration of captive carry exposure could be recorded during the missile’s service life, several advantages could be realized. Missiles that have been exposed to durations outside the design envelop could be flagged or screened for maintenance or inspection; lightly exposed missiles could be selected for critical mission applications; and missile allocation tomore » missions could be based on prior use to avoid overuse. The U. S. Army Aviation and Missile Research Development and Engineering Center (AMRDEC) has been developing health monitoring systems to assess and improve reliability of missiles during storage and field exposures. Under the direction of AMRDEC staff, engineers at the Pacific Northwest National Laboratory have developed a Captive Carry Health Monitor (CCHM) for the HELLFIRE II missile. The CCHM is an embedded usage monitoring device installed on the outer skin of the HELLFIRE II missile to record the cumulative hours the host missile has been in captive carry mode and thereby assess the overall health of the missile. This paper provides an overview of the CCHM electrical and package design, describes field testing and data analysis techniques used to identify captive carry, and discusses the potential application of missile health and usage data for real-time reliability analysis and fleet management.« less
48 CFR 3046.790-2 - Definitions (USCG).
Code of Federal Regulations, 2010 CFR
2010-10-01
... manufacturing particulars, including precise measurements, tolerances, materials and finished product tests for..., maintenance, and reliability characteristics of a system that are determined to be necessary for it to fulfill...
Organize to manage reliability
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ricketts, R.
An analysis of maintenance costs in hydrocarbon processing industry (HPI) plants has revealed that attitudes and practices of personnel are the major single bottom line factor. In reaching this conclusion, Solomon Associates examined comparative analysis of plant records over the past decade. The authors learned that there was a wide range of performance independent of refinery age, capacity, processing complexity, and location. Facilities of all extremes in these attributes are included in both high-cost and low-cost categories. Those in the lowest quartile of performance posted twice the resource consumption as the best quartile. Furthermore, there was almost no similarity betweenmore » refineries within a single company. The paper discusses cost versus availability, maintenance spending, two organizational approaches used (repair focused and reliability focused), and organizational style and structure.« less
Reliability Analysis and Standardization of Spacecraft Command Generation Processes
NASA Technical Reports Server (NTRS)
Meshkat, Leila; Grenander, Sven; Evensen, Ken
2011-01-01
center dot In order to reduce commanding errors that are caused by humans, we create an approach and corresponding artifacts for standardizing the command generation process and conducting risk management during the design and assurance of such processes. center dot The literature review conducted during the standardization process revealed that very few atomic level human activities are associated with even a broad set of missions. center dot Applicable human reliability metrics for performing these atomic level tasks are available. center dot The process for building a "Periodic Table" of Command and Control Functions as well as Probabilistic Risk Assessment (PRA) models is demonstrated. center dot The PRA models are executed using data from human reliability data banks. center dot The Periodic Table is related to the PRA models via Fault Links.
Alternative Fuels Data Center: Minnesota School District Finds Cost
Savings, Cold-Weather Reliability with Propane Buses Minnesota School District Finds Cost Center: Minnesota School District Finds Cost Savings, Cold-Weather Reliability with Propane Buses on Facebook Tweet about Alternative Fuels Data Center: Minnesota School District Finds Cost Savings, Cold
Integrated Life-Cycle Framework for Maintenance, Monitoring and Reliability of Naval Ship Structures
2012-08-15
number of times, a fast and accurate method for analyzing the ship hull is required. In order to obtain this required computational speed and accuracy...Naval Engineers Fleet Maintenance & Modernization Symposium (FMMS 2011) [8] and the Eleventh International Conference on Fast Sea Transportation ( FAST ...probabilistic strength of the ship hull. First, a novel deterministic method for the fast and accurate calculation of the strength of the ship hull is
A reliable absorbable intranasal bolster for proper maintenance of fractured nasal bone position.
Ducic, Y; Hilger, P A
1999-06-01
The maintenance of comminuted or otherwise unstable nasal bones in proper position following adequate operative reduction, may, on occasion, be a frustrating experience for both the patient and the surgeon. Migration of the fragments may compromise the aesthetic and functional results of well executed corrective nasal surgery. In this article, we will outline our successful, inexpensive approach to this occasionally challenging problem utilising an absorbable intranasal customised Surgicel bolster.
2016-10-04
analysis (due to site-level evaluations), but could be added in the future, include: wind turbines (the installations we visited were not interested due...procurement, operation, maintenance , testing, and fueling of the generators, detailed inventory and cost data is difficult to obtain. The DPW is often...understaffed, leading to uneven testing and maintenance of the equipment despite their best efforts. The reliability of these generators is typically
A guide to onboard checkout. Volume 4: Propulsion
NASA Technical Reports Server (NTRS)
1971-01-01
The propulsion system for a space station is considered with respect to onboard checkout requirements. Failure analysis, reliability, and maintenance features are presented. Computer analysis techniques are also discussed.
Summit Station Skiway Cost Analysis
2016-07-01
Laboratory (CRREL) U.S. Army Engineer Research and Development Center (ERDC) 72 Lyme Road Hanover, NH 03755-1290 Final Report Approved for...cargo loads. To explore further skiway improvement and cost saving techniques, this report reviews alternative maintenance and construction options...3 2.2 Maintenance
Advanced flight control system study
NASA Technical Reports Server (NTRS)
Mcgough, J.; Moses, K.; Klafin, J. F.
1982-01-01
The architecture, requirements, and system elements of an ultrareliable, advanced flight control system are described. The basic criteria are functional reliability of 10 to the minus 10 power/hour of flight and only 6 month scheduled maintenance. A distributed system architecture is described, including a multiplexed communication system, reliable bus controller, the use of skewed sensor arrays, and actuator interfaces. Test bed and flight evaluation program are proposed.
1987-06-01
NAVY OCCUPATIONAL HEALTH INFORMATION MANAGEMENT SYSTEM NOH I MS MEDICAL EXAM SCHEDULING MODULE PROGRAM MAINTENANCE MANUAL S JUNE 1987 DT11C 00... Information Management System (NOHIMS) ~ Medical Examination Scheduling (MES) Program Maintenance Manual 7. Author(s) 8. Performing Organization Rapt. No...the Navy Occupational Health Information Management System (NOHIMS). NOHIMS, whose initial version was developed at the Naval Health Research Center
75 FR 77862 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-14
... RM10-25-000......... Five-Year Review of Oil Pipeline Pricing Index. G-2 RM11-4-000 Storage Reporting............ Version One Regional Reliability Standards for Facilities Design, Connections, and Maintenance; Protection...
A guide to onboard checkout. Volume 3: Electrical power
NASA Technical Reports Server (NTRS)
1971-01-01
The baseline electrical power subsystem for a space station is considered. The subsystem was anlayzed in order to define onboard checkout requirements. Reliability, failure effects, and maintenance are discussed.
Real Time Maintenance Approval and Required IMMT Coordination
NASA Technical Reports Server (NTRS)
Burchell, S.
2016-01-01
Payloads are assessed for nominal operations. Payload Developers have the option of performing a maintenance hazard assessment (MHA) for potential maintenance activities. When POIC (Payload Operations and Integration Center) Safety reviews an OCR calling for a maintenance procedure, we cannot approve it without a MHA. If no MHA exists, we contact MER (Mission Evaluation Room) Safety. Depending on the nature of the problem, MER Safety has the option to: Analyze and grant approval themselves; Direct the payload back to the ISRP (Integrated Safety Review Panel); Direct the payload to the IMMT (Increment Mission Management Team).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meeuwsen, J.J.; Kling, W.L.; Ploem, W.A.G.A.
1997-01-01
Protection systems in power systems can fail either by not responding when they should (failure to operate) or by operating when they should not (false tripping). The former type of failure is particularly serious since it may result in the isolation of large sections of the network. However, the probability of a failure to operate can be reduced by carrying out preventive maintenance on protection systems. This paper describes an approach to determine the impact of preventive maintenance on protection systems on the reliability of the power supply to customers. The proposed approach is based on Markov models.
Research requirements to improve reliability of civil helicopters
NASA Technical Reports Server (NTRS)
Dougherty, J. J., III; Barrett, L. D.
1978-01-01
The major reliability problems of the civil helicopter fleet as reported by helicopter operational and maintenance personnel are documented. An assessment of each problem is made to determine if the reliability can be improved by application of present technology or whether additional research and development are required. The reliability impact is measured in three ways: (1) The relative frequency of each problem in the fleet. (2) The relative on-aircraft manhours to repair, associated with each fleet problem. (3) The relative cost of repair materials or replacement parts associated with each fleet problem. The data reviewed covered the period of 1971 through 1976 and covered only turbine engine aircraft.
Human reliability in petrochemical industry: an action research.
Silva, João Alexandre Pinheiro; Camarotto, João Alberto
2012-01-01
This paper aims to identify conflicts and gaps between the operators' strategies and actions and the organizational managerial approach for human reliability. In order to achieve these goals, the research approach adopted encompasses literature review, mixing action research methodology and Ergonomic Workplace Analysis in field research. The result suggests that the studied company has a classical and mechanistic point of view focusing on error identification and building barriers through procedures, checklists and other prescription alternatives to improve performance in reliability area. However, it was evident the fundamental role of the worker as an agent of maintenance and construction of system reliability during the action research cycle.
Intelligent Operation and Maintenance of Micro-grid Technology and System Development
NASA Astrophysics Data System (ADS)
Fu, Ming; Song, Jinyan; Zhao, Jingtao; Du, Jian
2018-01-01
In order to achieve the micro-grid operation and management, Studying the micro-grid operation and maintenance knowledge base. Based on the advanced Petri net theory, the fault diagnosis model of micro-grid is established, and the intelligent diagnosis and analysis method of micro-grid fault is put forward. Based on the technology, the functional system and architecture of the intelligent operation and maintenance system of micro-grid are studied, and the microcomputer fault diagnosis function is introduced in detail. Finally, the system is deployed based on the micro-grid of a park, and the micro-grid fault diagnosis and analysis is carried out based on the micro-grid operation. The system operation and maintenance function interface is displayed, which verifies the correctness and reliability of the system.
42 CFR 493.1254 - Standard: Maintenance and function checks.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 5 2010-10-01 2010-10-01 false Standard: Maintenance and function checks. 493.1254 Section 493.1254 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION LABORATORY REQUIREMENTS Quality System for Nonwaived...
Assessing inspection sensitivity as it relates to damage tolerance in composite rotor hubs
NASA Astrophysics Data System (ADS)
Roach, Dennis P.; Rackow, Kirk
2001-08-01
Increasing niche applications, growing international markets, and the emergence of advanced rotorcraft technology are expected to greatly increase the population of helicopters over the next decade. In terms of fuselage fatigue, helicopters show similar trends as fixed-wing aircraft. The highly unsteady loads experienced by rotating wings not only directly affect components in the dynamic systems but are also transferred to the fixed airframe structure. Expanded use of rotorcraft has focused attention on the use of new materials and the optimization of maintenance practices. The FAA's Airworthiness Assurance Center (AANC) at Sandia National Labs has joined with Bell Helicopter andother agencies in the rotorcraft industry to evaluate nondestructive inspection (NDI) capabilities in light of the damage tolerance of assorted rotorcraft structure components. Currently, the program's emphasis is on composite rotor hubs. The rotorcraft industry is constantly evaluating new types of lightweight composite materials that not only enhance the safety and reliability of rotor components but also improve performance and extended operating life as well. Composite rotor hubs have led to the use of bearingless rotor systems that are less complex and require less maintenance than their predecessors. The test facility described in this paper allows the structural stability and damage tolerance of composite hubs to be evaluated using realistic flight load spectrums of centrifugal force and bending loads. NDI was integrated into the life-cycle fatigue tests in order to evaluate flaw detection sensitivity simultaneously wiht residual strength and general rotor hub peformance. This paper will describe the evolving use of damage tolerance analysis (DTA) to direct and improve rotorcraft maintenance along with the related use of nondestructive inspections to manage helicopter safety. OVeralll, the data from this project will provide information to improve the producibility, inspectability, serviceability, and cost effectively of rotorcraft components.
Maintenance Process Strategic Analysis
NASA Astrophysics Data System (ADS)
Jasiulewicz-Kaczmarek, M.; Stachowiak, A.
2016-08-01
The performance and competitiveness of manufacturing companies is dependent on the availability, reliability and productivity of their production facilities. Low productivity, downtime, and poor machine performance is often linked to inadequate plant maintenance, which in turn can lead to reduced production levels, increasing costs, lost market opportunities, and lower profits. These pressures have given firms worldwide the motivation to explore and embrace proactive maintenance strategies over the traditional reactive firefighting methods. The traditional view of maintenance has shifted into one of an overall view that encompasses Overall Equipment Efficiency, Stakeholders Management and Life Cycle assessment. From practical point of view it requires changes in approach to maintenance represented by managers and changes in actions performed within maintenance area. Managers have to understand that maintenance is not only about repairs and conservations of machines and devices, but also actions striving for more efficient resources management and care for safety and health of employees. The purpose of the work is to present strategic analysis based on SWOT analysis to identify the opportunities and strengths of maintenance process, to benefit from them as much as possible, as well as to identify weaknesses and threats, so that they could be eliminated or minimized.
Feasibility of lane closures using probe data.
DOT National Transportation Integrated Search
2017-04-01
To develop an adequate traffic operations management and congestion mitigation plan for every roadway : maintenance and construction project requiring lane closures, transportation agencies need accurate and : reliable estimates of traffic impacts as...
For operation of the Computer Software Management and Information Center (COSMIC)
NASA Technical Reports Server (NTRS)
Carmon, J. L.
1983-01-01
Progress report on current status of computer software management and information center (COSMIC) includes the following areas: inventory, evaluation and publication, marketing, customer service, maintenance and support, and budget summary.
Safety, reliability, maintainability and quality provisions for the Space Shuttle program
NASA Technical Reports Server (NTRS)
1990-01-01
This publication establishes common safety, reliability, maintainability and quality provisions for the Space Shuttle Program. NASA Centers shall use this publication both as the basis for negotiating safety, reliability, maintainability and quality requirements with Shuttle Program contractors and as the guideline for conduct of program safety, reliability, maintainability and quality activities at the Centers. Centers shall assure that applicable provisions of the publication are imposed in lower tier contracts. Centers shall give due regard to other Space Shuttle Program planning in order to provide an integrated total Space Shuttle Program activity. In the implementation of safety, reliability, maintainability and quality activities, consideration shall be given to hardware complexity, supplier experience, state of hardware development, unit cost, and hardware use. The approach and methods for contractor implementation shall be described in the contractors safety, reliability, maintainability and quality plans. This publication incorporates provisions of NASA documents: NHB 1700.1 'NASA Safety Manual, Vol. 1'; NHB 5300.4(IA), 'Reliability Program Provisions for Aeronautical and Space System Contractors'; and NHB 5300.4(1B), 'Quality Program Provisions for Aeronautical and Space System Contractors'. It has been tailored from the above documents based on experience in other programs. It is intended that this publication be reviewed and revised, as appropriate, to reflect new experience and to assure continuing viability.
Development and Present Situation Analysis of Power Transformer State Maintenance
NASA Astrophysics Data System (ADS)
Lv, Sen; Li, Biao; Li, Huan
2018-02-01
The pivotal status of power transformer in the power system is one of the most important equipment. The safety and reliability of its operation is directly related to the safety and stability of power system. Based on the analysis of the present situation of power transformer state maintenance in home and abroad. The paper points out the deficiency of the current method and provides a theoretical basis for further research, which has a certain guiding significance.
Manned Orbital Transfer Vehicle (MOTV). Volume 5: Turnaround analysis
NASA Technical Reports Server (NTRS)
Boyland, R. E.; Sherman, S. W.; Morfin, H. W.
1979-01-01
The development of a low-cost reliable turnaround process to employ the MOTV in enhancing the utilization of the geosynchronous space region is analyzed. It is indicated that a routine effective turnaround/maintenance plan must make maximum use of flight data for maintenance planning, a high degree of test automation, and MOTV maintainability features in order to minimize tests, facilitate repair, and reduce manpower requirements. An effective turnaround plan provides a payback of reduced risks.
NASA Astrophysics Data System (ADS)
Simola, Kaisa; Laakso, Kari
1992-01-01
Eight years of operating experiences of 104 motor operated closing valves in different safety systems in nuclear power units were analyzed in a systematic way. The qualitative methods used were Failure Mode and Effect Analysis (FMEA) and Maintenance Effects and Criticality Analysis (MECA). These reliability engineering methods are commonly used in the design stage of equipment. The successful application of these methods for analysis and utilization of operating experiences was demonstrated.
Critical issues in assuring long lifetime and fail-safe operation of optical communications network
NASA Astrophysics Data System (ADS)
Paul, Dilip K.
1993-09-01
Major factors in assuring long lifetime and fail-safe operation in optical communications networks are reviewed in this paper. Reliable functionality to design specifications, complexity of implementation, and cost are the most critical issues. As economics is the driving force to set the goals as well as priorities for the design, development, safe operation, and maintenance schedules of reliable networks, a balance is sought between the degree of reliability enhancement, cost, and acceptable outage of services. Protecting both the link and the network with high reliability components, hardware duplication, and diversity routing can ensure the best network availability. Case examples include both fiber optic and lasercom systems. Also, the state-of-the-art reliability of photonics in space environment is presented.
Moderate peripheral neuropathy impairs weight transfer and unipedal balance in the elderly.
Richardson, J K; Ashton-Miller, J A; Lee, S G; Jacobs, K
1996-11-01
To quantitatively assess the performance of elderly with and without moderate, electrodiagnostically confirmed peripheral neuropathy (PN) on tasks of weight shifting and maintenance of unipedal balance. A case control study with PN subjects selected from a computerized data bank of all patients who had undergone electrodiagnostic studies at a university-based referral center. Control subjects of similar age and same gender were selected from the same source. Clinical examination included neurological and gross motor components. Quantitative evaluation included testing while the subjects stood with a force plate under each foot. Center of reaction (CR) excursions and ground reaction forces were quantified in: (1) six trials as subjects transferred their weight from bipedal stance to unipedal stance, on command, and attempted to maintain it for at least 3 seconds; and (2) in two additional trials in which subjects held unipedal stance for as long as possible. No subjects in either group had difficulty with level gait, a 180-degree turn, or required examiner assistance during an eyes-closed Romberg test. Biomechanical testing revealed that although the PN group used the same time to transfer their weight onto one foot as the C group, they achieved a significantly (1) lower rate of success in reliably maintaining 3 seconds of unipedal stance (.12 vs .58, p = .021), and (2) shorter mean maximum unipedal stance time (3.8 vs 32.3sec, p < .001). Furthermore, the PN group experienced greater difficulty in maintaining unipedal stance, as evidenced by significantly greater fluctuations in their ground reaction forces. The demonstrated impairment in reliability of unipedal stance in elderly with PN likely contributes to their known high rate of falls. Furthermore, unipedal stance testing serves to sharpen the physical examination by verifying the functional significance of impaired distal sensation-a common finding in the elderly.
[Examination of safety improvement by failure record analysis that uses reliability engineering].
Kato, Kyoichi; Sato, Hisaya; Abe, Yoshihisa; Ishimori, Yoshiyuki; Hirano, Hiroshi; Higashimura, Kyoji; Amauchi, Hiroshi; Yanakita, Takashi; Kikuchi, Kei; Nakazawa, Yasuo
2010-08-20
How the maintenance checks of the medical treatment system, including start of work check and the ending check, was effective for preventive maintenance and the safety improvement was verified. In this research, date on the failure of devices in multiple facilities was collected, and the data of the trouble repair record was analyzed by the technique of reliability engineering. An analysis of data on the system (8 general systems, 6 Angio systems, 11 CT systems, 8 MRI systems, 8 RI systems, and the radiation therapy system 9) used in eight hospitals was performed. The data collection period assumed nine months from April to December 2008. Seven items were analyzed. (1) Mean time between failures (MTBF) (2) Mean time to repair (MTTR) (3) Mean down time (MDT) (4) Number found by check in morning (5) Failure generation time according to modality. The classification of the breakdowns per device, the incidence, and the tendency could be understood by introducing reliability engineering. Analysis, evaluation, and feedback on the failure generation history are useful to keep downtime to a minimum and to ensure safety.
Preventive Maintenance Process
NASA Technical Reports Server (NTRS)
Ciaruffoli, Veronica; Bramley, Craig; Matteson, Mike
2001-01-01
The Preventive Maintenance (PM) program at Stennis Space Center (SSC) evolved from an ineffective and poorly organized state to a highly organized state in which it became capable of tracking equipment, planning jobs with man hour estimates, and supporting outsourcing. This viewgraph presentation traces the steps the program took to improve itself.
Employability Project: The Employment of Persons with Developmental Disabilities.
ERIC Educational Resources Information Center
Watson, Marge
The paper describes the efforts of Stepping Stones Growth Center, a vocational training organization which places persons with developmental disabilities into competitive employment. Two programs within Stepping Stones feature training for boat maintenance and janitorial and grounds maintenance. Placement preparation is described in terms of its…
Troubleshooting Complex Equipment in the Military Services: Research and Prospects.
1979-12-01
the maintenance concept for a given prime * ,equipeent. The concept defines levels of maintenance, the arrangements for support by mobile and depot...Naval Training Bquipment Center, 1975. Ross, S. AUmlied probability models with otimization aplications . San Francisco: Holden-Day, 1970. use, W.B. Human
Architecture and evolution of Goddard Space Flight Center Distributed Active Archive Center
NASA Technical Reports Server (NTRS)
Bedet, Jean-Jacques; Bodden, Lee; Rosen, Wayne; Sherman, Mark; Pease, Phil
1994-01-01
The Goddard Space Flight Center (GSFC) Distributed Active Archive Center (DAAC) has been developed to enhance Earth Science research by improved access to remote sensor earth science data. Building and operating an archive, even one of a moderate size (a few Terabytes), is a challenging task. One of the critical components of this system is Unitree, the Hierarchical File Storage Management System. Unitree, selected two years ago as the best available solution, requires constant system administrative support. It is not always suitable as an archive and distribution data center, and has moderate performance. The Data Archive and Distribution System (DADS) software developed to monitor, manage, and automate the ingestion, archive, and distribution functions turned out to be more challenging than anticipated. Having the software and tools is not sufficient to succeed. Human interaction within the system must be fully understood to improve efficiency to improve efficiency and ensure that the right tools are developed. One of the lessons learned is that the operability, reliability, and performance aspects should be thoroughly addressed in the initial design. However, the GSFC DAAC has demonstrated that it is capable of distributing over 40 GB per day. A backup system to archive a second copy of all data ingested is under development. This backup system will be used not only for disaster recovery but will also replace the main archive when it is unavailable during maintenance or hardware replacement. The GSFC DAAC has put a strong emphasis on quality at all level of its organization. A Quality team has also been formed to identify quality issues and to propose improvements. The DAAC has conducted numerous tests to benchmark the performance of the system. These tests proved to be extremely useful in identifying bottlenecks and deficiencies in operational procedures.
1987-06-01
NAVY OCCUPATIONAL HEALTH INFORMATION MANAGEMENT SYSTEM NOHIMS SYSTEM-WIDE MODULE PROGRAM MAINTENANCE MANUAL JUNE 1987 DTIC 00 SEP I 21988DJ 0) 4... INFORMATION MANAGEMENT SYSTEM (NOHIMS) N 1.98 SYSTEM-WIDE MODULE PROGRAM MAINTENANCE MANUAL 7. Author(s) a. Performing Organization Rapt. No. MITRE... Management System (NOHIMS). NORIMS, whose initial version was ,eveloped at the Naval Health Research Center (NHRC), is a composite of 4 -’o subsystems: an
Tolerance in liver transplantation: Biomarkers and clinical relevance
Baroja-Mazo, Alberto; Revilla-Nuin, Beatriz; Parrilla, Pascual; Martínez-Alarcón, Laura; Ramírez, Pablo; Pons, José Antonio
2016-01-01
Transplantation is the optimal treatment for end-stage organ failure, and modern immunosuppression has allowed important progress in short-term outcomes. However, immunosuppression poorly influences chronic rejection and elicits chronic toxicity in current clinical practice. Thus, a major goal in transplantation is to understand and induce tolerance. It is well established that human regulatory T cells expressing the transcription factor FoxP3 play important roles in the maintenance of immunological self-tolerance and immune homeostasis. The major regulatory T cell subsets and mechanisms of expansion that are critical for induction and long-term maintenance of graft tolerance and survival are being actively investigated. Likewise, other immune cells, such as dendritic cells, monocyte/macrophages or natural killer cells, have been described as part of the process known as “operational tolerance”. However, translation of these results towards clinical practice needs solid tools to identify accurately and reliably patients who are going to be tolerant. In this way, a plethora of genetic and cellular biomarkers is raising and being validated worldwide in large multi-center clinical trials. Few of the studies performed so far have provided a detailed analysis of the impact of immunosuppression withdrawal on pre-existing complications derived from the long-term administration of immunosuppressive drugs and the side effects associated with them. The future of liver transplantation is aimed to develop new therapies which increase the actual low tolerant vs non-tolerant recipients ratio. PMID:27678350
Illinois high-speed rail four-quadrant gate reliability assessment
DOT National Transportation Integrated Search
2009-10-01
The Federal Railroad Administration (FRA) tasked the John A. Volpe National Transportation Systems Center (Volpe Center) to conduct a reliability analysis of the four-quadrant gate/vehicle detection equipment installed on the future high-speed rail (...
Evaluation of the towplow for Caltrans operations.
DOT National Transportation Integrated Search
2015-09-30
Caltrans requested that the Advanced Highway Maintenance and Construction Technology Research Center (AHMCT) research center configure, procure, and deploy two Viking-Cives TowPlow systems and conduct an extensive evaluation to determine the most ben...
42 CFR 483.138 - Maintenance of services and availability of FFP.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 5 2013-10-01 2013-10-01 false Maintenance of services and availability of FFP. 483.138 Section 483.138 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION REQUIREMENTS FOR STATES AND LONG TERM CARE...
42 CFR 483.138 - Maintenance of services and availability of FFP.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 5 2012-10-01 2012-10-01 false Maintenance of services and availability of FFP. 483.138 Section 483.138 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION REQUIREMENTS FOR STATES AND LONG TERM CARE...
42 CFR 483.138 - Maintenance of services and availability of FFP.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 5 2010-10-01 2010-10-01 false Maintenance of services and availability of FFP. 483.138 Section 483.138 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION REQUIREMENTS FOR STATES AND LONG TERM CARE...
42 CFR 483.138 - Maintenance of services and availability of FFP.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 5 2011-10-01 2011-10-01 false Maintenance of services and availability of FFP. 483.138 Section 483.138 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION REQUIREMENTS FOR STATES AND LONG TERM CARE...
42 CFR 483.138 - Maintenance of services and availability of FFP.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 5 2014-10-01 2014-10-01 false Maintenance of services and availability of FFP. 483.138 Section 483.138 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION REQUIREMENTS FOR STATES AND LONG TERM CARE...
48 CFR 204.7204 - Maintenance of the CAGE file.
Code of Federal Regulations, 2014 CFR
2014-10-01
... electronic equivalent, to— DLA Logistics Information Service, DLIS-SBB, Federal Center, 74 Washington Avenue... Maintenance of the CAGE file. (a) DLA Logistics Information Service will accept written requests for changes...) Additional guidance for maintaining CAGE codes is in Volume 7 of DoD 4100.39-M, Federal Logistics Information...
48 CFR 204.7204 - Maintenance of the CAGE file.
Code of Federal Regulations, 2011 CFR
2011-10-01
... electronic equivalent, to— DLA Logistics Information Service, DLIS-SBB, Federal Center, 74 Washington Avenue... Maintenance of the CAGE file. (a) DLA Logistics Information Service will accept written requests for changes...) Additional guidance for maintaining CAGE codes is in Volume 7 of DoD 4100.39-M, Federal Logistics Information...
48 CFR 204.7204 - Maintenance of the CAGE file.
Code of Federal Regulations, 2013 CFR
2013-10-01
... electronic equivalent, to— DLA Logistics Information Service, DLIS-SBB, Federal Center, 74 Washington Avenue... Maintenance of the CAGE file. (a) DLA Logistics Information Service will accept written requests for changes...) Additional guidance for maintaining CAGE codes is in Volume 7 of DoD 4100.39-M, Federal Logistics Information...
48 CFR 204.7204 - Maintenance of the CAGE file.
Code of Federal Regulations, 2012 CFR
2012-10-01
... electronic equivalent, to— DLA Logistics Information Service, DLIS-SBB, Federal Center, 74 Washington Avenue... Maintenance of the CAGE file. (a) DLA Logistics Information Service will accept written requests for changes...) Additional guidance for maintaining CAGE codes is in Volume 7 of DoD 4100.39-M, Federal Logistics Information...
39. Perimeter acquisition radar building room #504, techinal maintenance and ...
39. Perimeter acquisition radar building room #504, techinal maintenance and repair center (TMRC) and tactical support equipment (TSE) storage area; storage-travel wave tubes - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND
A study on the real-time reliability of on-board equipment of train control system
NASA Astrophysics Data System (ADS)
Zhang, Yong; Li, Shiwei
2018-05-01
Real-time reliability evaluation is conducive to establishing a condition based maintenance system for the purpose of guaranteeing continuous train operation. According to the inherent characteristics of the on-board equipment, the connotation of reliability evaluation of on-board equipment is defined and the evaluation index of real-time reliability is provided in this paper. From the perspective of methodology and practical application, the real-time reliability of the on-board equipment is discussed in detail, and the method of evaluating the realtime reliability of on-board equipment at component level based on Hidden Markov Model (HMM) is proposed. In this method the performance degradation data is used directly to realize the accurate perception of the hidden state transition process of on-board equipment, which can achieve a better description of the real-time reliability of the equipment.
Understanding and Predicting the Process of Software Maintenance Releases
NASA Technical Reports Server (NTRS)
Basili, Victor; Briand, Lionel; Condon, Steven; Kim, Yong-Mi; Melo, Walcelio L.; Valett, Jon D.
1996-01-01
One of the major concerns of any maintenance organization is to understand and estimate the cost of maintenance releases of software systems. Planning the next release so as to maximize the increase in functionality and the improvement in quality are vital to successful maintenance management. The objective of this paper is to present the results of a case study in which an incremental approach was used to better understand the effort distribution of releases and build a predictive effort model for software maintenance releases. This study was conducted in the Flight Dynamics Division (FDD) of NASA Goddard Space Flight Center(GSFC). This paper presents three main results: 1) a predictive effort model developed for the FDD's software maintenance release process; 2) measurement-based lessons learned about the maintenance process in the FDD; and 3) a set of lessons learned about the establishment of a measurement-based software maintenance improvement program. In addition, this study provides insights and guidelines for obtaining similar results in other maintenance organizations.
Rail Transit Fare Collection : Policy and Technology Assessment
DOT National Transportation Integrated Search
1982-12-01
In an attempt to resolve reliability problems, lower operation and maintenance costs, and simplify fare collection, transit authorities are focusing on their fare collection systems. Many transit properties have existing fare collection systems which...
77 FR 63850 - Rate Adjustments for Indian Irrigation Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-17
... the reliable operation of the irrigation facility infrastructure; (h) Maintenance of a vehicle and... Willow Creek O&M (includes Agency, Lodge Grass 1, Lodge Grass 2, Reno, Upper Little Horn, and Forty Mile...
Software framework for prognostic health monitoring of ocean-based power generation
NASA Astrophysics Data System (ADS)
Bowren, Mark
On August 5, 2010 the U.S. Department of Energy (DOE) has designated the Center for Ocean Energy Technology (COET) at Florida Atlantic University (FAU) as a national center for ocean energy research and development of prototypes for open-ocean power generation. Maintenance on ocean-based machinery can be very costly. To avoid unnecessary maintenance it is necessary to monitor the condition of each machine in order to predict problems. This kind of prognostic health monitoring (PHM) requires a condition-based maintenance (CBM) system that supports diagnostic and prognostic analysis of large amounts of data. Research in this field led to the creation of ISO13374 and the development of a standard open-architecture for machine condition monitoring. This thesis explores an implementation of such a system for ocean-based machinery using this framework and current open-standard technologies.
Program for computer aided reliability estimation
NASA Technical Reports Server (NTRS)
Mathur, F. P. (Inventor)
1972-01-01
A computer program for estimating the reliability of self-repair and fault-tolerant systems with respect to selected system and mission parameters is presented. The computer program is capable of operation in an interactive conversational mode as well as in a batch mode and is characterized by maintenance of several general equations representative of basic redundancy schemes in an equation repository. Selected reliability functions applicable to any mathematical model formulated with the general equations, used singly or in combination with each other, are separately stored. One or more system and/or mission parameters may be designated as a variable. Data in the form of values for selected reliability functions is generated in a tabular or graphic format for each formulated model.
Analysis Of The Effects Of Marine Corps M1A1 Abram’s Tank Age On Operational Availability
2014-06-01
effects of age, as measured by the time since the last depot- level rebuild, on equipment operational availability for the M1A1 MBT in the Marine Corps...prior M1A1 reliability studies. We reviewed depot- and unit- level maintenance records within the USMC’s System Operational Effectiveness database to... Level Maintenance 15. NUMBER OF PAGES 67 16. PRICE CODE 17. SECURITY CLASSIFICATION OF REPORT Unclassified 18. SECURITY CLASSIFICATION OF
The Application of Surface Potential Test on Hand-making Insulation for Generator Stator End-winding
NASA Astrophysics Data System (ADS)
Lu, Zhu-mao; Liu, Qing; Wang, Tian-zheng; Bai, Lu; Li, Yan-peng
2017-05-01
This paper presents the advantage of surface potential test on hand-making insulation for generator stator end-winding insulation detection, compared with DC or AC withstand voltage test, also details the test principle, connection method and test notes. And through the case, surface potential test on hand-making insulation proved effective for insulation quality detection after generator stator end-winding maintenance, and the experimental data is useful and reliable for the electrical equipment operation and maintenance in the power plant.
2011-05-24
1 ARC 5/24/2011 UNCLASSIFIED: Distribution Statement A. Approved for public release Amandeep Singh1, Igor Baseski1,2 1U.S. Army, RDECOM TARDEC...of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering...currently valid OMB control number. 1 . REPORT DATE 24 MAY 2011 2. REPORT TYPE Briefing Charts 3. DATES COVERED 24-05-2011 to 24-05-2011 4. TITLE
NASA Technical Reports Server (NTRS)
Lemanski, A. J.
1976-01-01
Helicopter drive-system technology which would result in the largest benefit in direct maintenance cost when applied to civil helicopters in the 1980 timeframe was developed. A prototype baseline drive system based on 1975 technology provided the basis for comparison against the proposed advanced technology in order to determine the potential for each area recommended for improvement. A specific design example of an advanced-technology main transmission is presented to define improvements for maintainability, weight, producibility, reliability, noise, vibration, and diagnostics. Projections of the technology achievable in the 1980 timeframe are presented. Based on this data, the technologies with the highest payoff (lowest direct maintenance cost) for civil-helicopter drive systems are identified.
CERN experience and strategy for the maintenance of cryogenic plants and distribution systems
NASA Astrophysics Data System (ADS)
Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Pezzetti, M.; Pirotte, O.; Tavian, L.; Wagner, U.
2015-12-01
CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. After several years of exploitation of a wide range of cryogenic installations and in particular following the last two years major shutdown to maintain and consolidate the LHC machine, we have analysed and reviewed the maintenance activities to implement an efficient and reliable exploitation of the installations. We report the results, statistics and lessons learned on the maintenance activities performed and in particular the required consolidations and major overhauling, the organization, management and methodologies implemented.
Evaluating alternative service contracts for medical equipment.
De Vivo, L; Derrico, P; Tomaiuolo, D; Capussotto, C; Reali, A
2004-01-01
Managing medical equipments is a formidable task that has to be pursued maximizing the benefits within a highly regulated and cost-constrained environment. Clinical engineers are uniquely equipped to determine which policies are the most efficacious and cost effective for a health care institution to ensure that medical devices meet appropriate standards of safety, quality and performance. Part of this support is a strategy for preventive and corrective maintenance. This paper describes an alternative scheme of OEM (Original Equipment Manufacturer) service contract for medical equipment that combines manufacturers' technical support and in-house maintenance. An efficient and efficacious organization can reduce the high cost of medical equipment maintenance while raising reliability and quality. Methodology and results are discussed.
Outage maintenance checks on large generator windings
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nindra, B.; Jeney, S.I.; Slobodinsky, Y.
In the present days of austerity, more constraints and pressures are being brought on the maintenance engineers to certify the generators for their reliability and life extension. The outages are shorter and intervals between the outages are becoming longer. The annual outages were very common when utilities had no regulatory constraints and also had standby capacities. Furthermore, due to lean and mean budgets, outage maintenance programs are being pursued more aggressively, so that longer interval outages can be achieved to ensure peak generator performance. This paper will discuss various visual checks, electrical tests and recommended fixes to achieve the abovemore » mentioned objectives, in case any deficiencies are found.« less
NASA Astrophysics Data System (ADS)
Alsyouf, Imad
2018-05-01
Reliability and availability of critical systems play an important role in achieving the stated objectives of engineering assets. Preventive replacement time affects the reliability of the components, thus the number of system failures encountered and its downtime expenses. On the other hand, spare parts inventory level is a very critical factor that affects the availability of the system. Usually, the decision maker has many conflicting objectives that should be considered simultaneously for the selection of the optimal maintenance policy. The purpose of this research was to develop a bi-objective model that will be used to determine the preventive replacement time for three maintenance policies (age, block good as new, block bad as old) with consideration of spare parts’ availability. It was suggested to use a weighted comprehensive criterion method with two objectives, i.e. cost and availability. The model was tested with a typical numerical example. The results of the model demonstrated its effectiveness in enabling the decision maker to select the optimal maintenance policy under different scenarios and taking into account preferences with respect to contradicting objectives such as cost and availability.
2nd & 3rd Generation Vehicle Subsystems
NASA Technical Reports Server (NTRS)
2000-01-01
This paper contains viewgraph presentation on the "2nd & 3rd Generation Vehicle Subsystems" project. The objective behind this project is to design, develop and test advanced avionics, power systems, power control and distribution components and subsystems for insertion into a highly reliable and low-cost system for a Reusable Launch Vehicles (RLV). The project is divided into two sections: 3rd Generation Vehicle Subsystems and 2nd Generation Vehicle Subsystems. The following topics are discussed under the first section, 3rd Generation Vehicle Subsystems: supporting the NASA RLV program; high-performance guidance & control adaptation for future RLVs; Evolvable Hardware (EHW) for 3rd generation avionics description; Scaleable, Fault-tolerant Intelligent Network or X(trans)ducers (SFINIX); advance electric actuation devices and subsystem technology; hybrid power sources and regeneration technology for electric actuators; and intelligent internal thermal control. Topics discussed in the 2nd Generation Vehicle Subsystems program include: design, development and test of a robust, low-maintenance avionics with no active cooling requirements and autonomous rendezvous and docking systems; design and development of a low maintenance, high reliability, intelligent power systems (fuel cells and battery); and design of a low cost, low maintenance high horsepower actuation systems (actuators).
Performance-based maintenance of gas turbines for reliable control of degraded power systems
NASA Astrophysics Data System (ADS)
Mo, Huadong; Sansavini, Giovanni; Xie, Min
2018-03-01
Maintenance actions are necessary for ensuring proper operations of control systems under component degradation. However, current condition-based maintenance (CBM) models based on component health indices are not suitable for degraded control systems. Indeed, failures of control systems are only determined by the controller outputs, and the feedback mechanism compensates the control performance loss caused by the component deterioration. Thus, control systems may still operate normally even if the component health indices exceed failure thresholds. This work investigates the CBM model of control systems and employs the reduced control performance as a direct degradation measure for deciding maintenance activities. The reduced control performance depends on the underlying component degradation modelled as a Wiener process and the feedback mechanism. To this aim, the controller features are quantified by developing a dynamic and stochastic control block diagram-based simulation model, consisting of the degraded components and the control mechanism. At each inspection, the system receives a maintenance action if the control performance deterioration exceeds its preventive-maintenance or failure thresholds. Inspired by realistic cases, the component degradation model considers random start time and unit-to-unit variability. The cost analysis of maintenance model is conducted via Monte Carlo simulation. Optimal maintenance strategies are investigated to minimize the expected maintenance costs, which is a direct consequence of the control performance. The proposed framework is able to design preventive maintenance actions on a gas power plant, to ensuring required load frequency control performance against a sudden load increase. The optimization results identify the trade-off between system downtime and maintenance costs as a function of preventive maintenance thresholds and inspection frequency. Finally, the control performance-based maintenance model can reduce maintenance costs as compared to CBM and pre-scheduled maintenance.
NASA Technical Reports Server (NTRS)
1999-01-01
Sentel Corporation has commercialized NASA's Electronic Portable Information Collection (EPIC) System, which stemmed from a NASA Kennedy Space Center SBIR contract. NASA and Sentel designed, built, and tested work authorization procedures used as a paperless procedures system for Space Shuttle and International Space Station payload processing operations. EPIC is now being applied to various markets including; airplane maintenance, aerospace system data management, shipbuilding industries, shipping industries, law enforcement agencies, and public utilities. KSC is planning a pilot program to use EPIC at the Hypergol Maintenance Facility. In addition, Ames Research Center and KSC are working together to apply EPIC to the area of wireless communication.
Optimal maintenance policy incorporating system level and unit level for mechanical systems
NASA Astrophysics Data System (ADS)
Duan, Chaoqun; Deng, Chao; Wang, Bingran
2018-04-01
The study works on a multi-level maintenance policy combining system level and unit level under soft and hard failure modes. The system experiences system-level preventive maintenance (SLPM) when the conditional reliability of entire system exceeds SLPM threshold, and also undergoes a two-level maintenance for each single unit, which is initiated when a single unit exceeds its preventive maintenance (PM) threshold, and the other is performed simultaneously the moment when any unit is going for maintenance. The units experience both periodic inspections and aperiodic inspections provided by failures of hard-type units. To model the practical situations, two types of economic dependence have been taken into account, which are set-up cost dependence and maintenance expertise dependence due to the same technology and tool/equipment can be utilised. The optimisation problem is formulated and solved in a semi-Markov decision process framework. The objective is to find the optimal system-level threshold and unit-level thresholds by minimising the long-run expected average cost per unit time. A formula for the mean residual life is derived for the proposed multi-level maintenance policy. The method is illustrated by a real case study of feed subsystem from a boring machine, and a comparison with other policies demonstrates the effectiveness of our approach.
Weigh-in-Motion systems evaluation : final report.
DOT National Transportation Integrated Search
1976-04-01
This relatively short-term project was initiated in order to perfect installation, operation, and maintenance practices necessary for continued accurate and reliable operation of a computerized Weigh-in-Motion system which will be used to gather truc...
Extending the life and recycle capability of earth storable propellant systems.
NASA Technical Reports Server (NTRS)
Schweickert, T. F.
1972-01-01
Rocket propulsion systems for reusable vehicles will be required to operate reliably for a large number of missions with a minimum of maintenance and a fast turnaround. For the space shuttle reaction control system to meet these requirements, current and prior related system failures were examined for their impact on reuse and, where warranted, component design and/or system configuration changes were defined for improving system service life. It was found necessary to change the pressurization component arrangement used on many single-use applications in order to eliminate a prevalent check valve failure mode and to incorporate redundant expulsion capability in propellant tank designs to achieve the necessary system reliability. Material flaws in pressurant and propellant tanks were noted to have a significant effect on tank cycle life. Finally, maintenance considerations dictated a modularized systems approach, allowing the system to be removed from the vehicle for service and repair at a remote site.
NASA Astrophysics Data System (ADS)
Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.
2016-08-01
In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.
Evaluation Metrics for Biostatistical and Epidemiological Collaborations
Rubio, Doris McGartland; del Junco, Deborah J.; Bhore, Rafia; Lindsell, Christopher J.; Oster, Robert A.; Wittkowski, Knut M.; Welty, Leah J.; Li, Yi-Ju; DeMets, Dave
2011-01-01
Increasing demands for evidence-based medicine and for the translation of biomedical research into individual and public health benefit have been accompanied by the proliferation of special units that offer expertise in biostatistics, epidemiology, and research design (BERD) within academic health centers. Objective metrics that can be used to evaluate, track, and improve the performance of these BERD units are critical to their successful establishment and sustainable future. To develop a set of reliable but versatile metrics that can be adapted easily to different environments and evolving needs, we consulted with members of BERD units from the consortium of academic health centers funded by the Clinical and Translational Science Award Program of the National Institutes of Health. Through a systematic process of consensus building and document drafting, we formulated metrics that covered the three identified domains of BERD practices: the development and maintenance of collaborations with clinical and translational science investigators, the application of BERD-related methods to clinical and translational research, and the discovery of novel BERD-related methodologies. In this article, we describe the set of metrics and advocate their use for evaluating BERD practices. The routine application, comparison of findings across diverse BERD units, and ongoing refinement of the metrics will identify trends, facilitate meaningful changes, and ultimately enhance the contribution of BERD activities to biomedical research. PMID:21284015
Damage Detection in Railway Prestressed Concrete Sleepers using Acoustic Emission
NASA Astrophysics Data System (ADS)
Clark, A.; Kaewunruen, S.; Janeliukstis, R.; Papaelias, M.
2017-10-01
Prestressed concrete sleepers (or railroad ties) are safety-critical elements in railway tracks that distribute the wheel loads from the rails to the track support system. Over a period of time, the concrete sleepers age and deteriorate in addition to experiencing various types of static and dynamic loading conditions, which are attributable to train operations. In many cases, structural cracks can develop within the sleepers due to high intensity impact loads or due to poor track maintenance. Often, cracks of sleepers develop and present at the midspan due to excessive negative bending. These cracks can cause broken sleepers and sometimes called ‘center bound’ problem in railway lines. This paper is the world first to present an application of non-destructive acoustic emission technology for damage detection in railway concrete sleepers. It presents experimental investigations in order to detect center-bound cracks in railway prestressed concrete sleepers. Experimental laboratory testing involves three-point bending tests of four concrete sleepers. Three-point bending tests correspond to a real failure mode, when the loads are not transferred uniformly to the ballast support. It is observed that AE sensing provides an accurate means for detecting the location and magnitude of cracks in sleepers. Sensor location criticality is also highlighted in the paper to demonstrate the reliability-based damage detection of the sleepers.
Electrochemical Investigation of Corrosion in the Space Shuttle Launch Environment
NASA Technical Reports Server (NTRS)
Calle, L. M.
2004-01-01
Corrosion studies began at NASA/Kennedy Space Center in 1966 during the Gemini/Apollo Programs with the evaluation of long-term protective coatings for the atmospheric protection of carbon steel. An outdoor exposure facility on the beach near the launch pad was established for this purpose at that time. The site has provided over 35 years of technical information on the evaluation of the long-term corrosion performance of many materials and coatings as well as on maintenance procedures. Results from these evaluations have helped NASA find new materials and processes that increase the safety and reliability of our flight hardware, launch structures, and ground support equipment. The launch environment at the Kennedy Space Center (KSC) is extremely corrosive due to the combination of ocean salt spray, heat, humidity, and sunlight. With the introduction of the Space Shuttle in 1981, the already highly corrosive conditions at the launch pad were rendered even more severe by the acidic exhaust from the solid rocket boosters. It has been estimated that 70 tons of hydrochloric acid (HC1) are produced during a launch. The Corrosion Laboratory at NASA/KSC was established in 1985 to conduct electrochemical studies of corrosion on materials and coatings under conditions similar to those encountered at the launch pads. I will present highlights of some of these investigations.
Ultra Reliability Workshop Introduction
NASA Technical Reports Server (NTRS)
Shapiro, Andrew A.
2006-01-01
This plan is the accumulation of substantial work by a large number of individuals. The Ultra-Reliability team consists of representatives from each center who have agreed to champion the program and be the focal point for their center. A number of individuals from NASA, government agencies (including the military), universities, industry and non-governmental organizations also contributed significantly to this effort. Most of their names may be found on the Ultra-Reliability PBMA website.
Simulation-Based Acceptance Testing for Unmanned Ground Vehicles
2011-05-12
Ground Robotic Reliability Center (GRRC) at the University of Michigan in 2010, the focus of his research has been on unmanned ground vehicles...Jong Lee is a former student of the University of Michigan’s Ground Robotics Reliability Center (GRRC). He received his Bachelor’s and Master’s degree...methods to improve reliability of Unmanned Ground Vehicle (UGV) systems. His primary research interests include robotic systems and control
ERIC Educational Resources Information Center
Jones, Katherine J.; Vandenberg, Edward V.; Bottsford, Lisa
2011-01-01
The authors describe the prevalence, formation, maintenance, and evaluation of student aging interest groups. They conducted a cross-sectional electronic survey of the 46 academic medical centers funded by the Donald W. Reynolds Foundation. To evaluate their group of approximately 50 students, the authors conducted an electronic pretest and…
78 FR 11889 - Notice of Meeting of the ICD-9-CM Coordination and Maintenance Committee; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-20
... of the meeting announcement should read as follows: Notice of Meeting of the ICD-9-CM Coordination and Maintenance Committee. The first sentence of the notice should read as follows: National Center for Health Statistics (NCHS), Classifications and Public Health Data Standards Staff announces the...
FLIGHT LINE, LOOKING TOWARD FLIGHT LINE FIRE STATION (BUILDING 2748)CENTER ...
FLIGHT LINE, LOOKING TOWARD FLIGHT LINE FIRE STATION (BUILDING 2748)CENTER AND AIRCRAFT MAINTENANCE DOCKS (BUILDINGS 2741 AND 2766)LEFT. VIEW TO NORTH - Plattsburgh Air Force Base, U.S. Route 9, Plattsburgh, Clinton County, NY
Pipeline scada upgrade uses satellite terminal system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conrad, W.; Skovrinski, J.R.
In the recent automation of its supervisory control and data acquisition (scada) system, Transwestern Pipeline Co. has become the first to use very small aperture satellite terminals (VSAT's) for scada. A subsidiary of Enron Interstate Pipeline, Houston, Transwestern moves natural gas through a 4,400-mile system from West Texas, New Mexico, and Oklahoma to southern California markets. Transwestern's modernization, begun in November 1985, addressed problems associated with its aging control equipment which had been installed when the compressor stations were built in 1960. Over the years a combination of three different systems had been added. All were cumbersome to maintain andmore » utilized outdated technology. Problems with reliability, high maintenance time, and difficulty in getting new parts were determining factors in Transwestern's decision to modernize its scada system. In addition, the pipeline was anticipating moving its control center from Roswell, N.M., to Houston and believed it would be impossible to marry the old system with the new computer equipment in Houston.« less
Implementation of Autonomous Control Technology for Plant Growth Chambers
NASA Technical Reports Server (NTRS)
Costello, Thomas A.; Sager, John C.; Krumins, Valdis; Wheeler, Raymond M.
2002-01-01
The Kennedy Space Center has significant infrastructure for research using controlled environment plant growth chambers. Such research supports development of bioregenerative life support technology for long-term space missions. Most of the existing chambers in Hangar L and Little L will be moved to the new Space Experiment Research and Processing Laboratory (SERPL) in the summer of 2003. The impending move has created an opportunity to update the control system technologies to allow for greater flexibility, less labor for set-up and maintenance, better diagnostics, better reliability and easier data retrieval. Part of these improvements can be realized using hardware which communicates through an ethernet connection to a central computer for supervisory control but can be operated independently of the computer during routine run-time. Both the hardware and software functionality of an envisioned system were tested on a prototype plant growth chamber (CEC-4) in Hangar L. Based upon these tests, recommendations for hardware and software selection and system design for implementation in SERPL are included.
Final Environmental Impact Statement: Disposal and Reuse of Carswell Air Force Base, Texas
1994-07-01
maintenance shops, airfield infrastructure, medical clinic, and child care center. New construction would include a reserve training center, guard...includes a private cemetery and a child care center. The cemetery would be left undisturbed and the child care center would be converted for a city hall... child care center, and a floodplain associated with Farmers Branch Creek. The golf course area could be reused soon after disposal of the property
Android platform based smartphones for a logistical remote association repair framework.
Lien, Shao-Fan; Wang, Chun-Chieh; Su, Juhng-Perng; Chen, Hong-Ming; Wu, Chein-Hsing
2014-06-25
The maintenance of large-scale systems is an important issue for logistics support planning. In this paper, we developed a Logistical Remote Association Repair Framework (LRARF) to aid repairmen in keeping the system available. LRARF includes four subsystems: smart mobile phones, a Database Management System (DBMS), a Maintenance Support Center (MSC) and wireless networks. The repairman uses smart mobile phones to capture QR-codes and the images of faulty circuit boards. The captured QR-codes and images are transmitted to the DBMS so the invalid modules can be recognized via the proposed algorithm. In this paper, the Linear Projective Transform (LPT) is employed for fast QR-code calibration. Moreover, the ANFIS-based data mining system is used for module identification and searching automatically for the maintenance manual corresponding to the invalid modules. The inputs of the ANFIS-based data mining system are the QR-codes and image features; the output is the module ID. DBMS also transmits the maintenance manual back to the maintenance staff. If modules are not recognizable, the repairmen and center engineers can obtain the relevant information about the invalid modules through live video. The experimental results validate the applicability of the Android-based platform in the recognition of invalid modules. In addition, the live video can also be recorded synchronously on the MSC for later use.
Design of a Glenn Research Center Solar Field Grid-Tied Photovoltaic Power System
NASA Technical Reports Server (NTRS)
Eichenberg, Dennis J.
2009-01-01
The NASA Glenn Research Center (GRC) designed, developed, and installed, a 37.5 kW DC photovoltaic (PV) Solar Field in the GRC West Area in the 1970s for the purpose of testing PV panels for various space and terrestrial applications. The PV panels are arranged to provide a nominal 120 VDC. The GRC Solar Field has been extremely successful in meeting its mission. The PV panels and the supporting electrical systems are all near their end of life. GRC has designed a 72 kW DC grid-tied PV power system to replace the existing GRC West Area Solar Field. The 72 kW DC grid-tied PV power system will provide DC solar power for GRC PV testing applications, and provide AC facility power for all times that research power is not required. A grid-tied system is connected directly to the utility distribution grid. Facility power can be obtained from the utility system as normal. The PV system is synchronized with the utility system to provide power for the facility, and excess power is provided to the utility for use by all. The project transfers space technology to terrestrial use via nontraditional partners. GRC personnel glean valuable experience with PV power systems that are directly applicable to various space power systems, and provide valuable space program test data. PV power systems help to reduce harmful emissions and reduce the Nation s dependence on fossil fuels. Power generated by the PV system reduces the GRC utility demand, and the surplus power aids the community. Present global energy concerns reinforce the need for the development of alternative energy systems. Modern PV panels are readily available, reliable, efficient, and economical with a life expectancy of at least 25 years. Modern electronics has been the enabling technology behind grid-tied power systems, making them safe, reliable, efficient, and economical with a life expectancy of at least 25 years. The report concludes that the GRC West Area grid-tied PV power system design is viable for a reliable, maintenance free, long life power system that is of significant value to NASA and the community.
Magnan, Morris A; Maklebust, Joann
2008-01-01
To evaluate the effect of Web-based Braden Scale training on the reliability and precision of pressure ulcer risk assessments made by registered nurses (RN) working in acute care settings. Pretest-posttest, 2-group, quasi-experimental design. Five hundred Braden Scale risk assessments were made on 102 acute care patients deemed to be at various levels of risk for pressure ulceration. Assessments were made by RNs working in acute care hospitals at 3 different medical centers where the Braden Scale was in regular daily use (2 medical centers) or new to the setting (1 medical center). The Braden Scale for Predicting Pressure Sore Risk was used to guide pressure ulcer risk assessments. A Web-based version of the Detroit Medical Center Braden Scale Computerized Training Module was used to teach nurses correct use of the Braden Scale and selection of risk-based pressure ulcer prevention interventions. In the aggregate, RN generated reliable Braden Scale pressure ulcer risk assessments 65% of the time after training. The effect of Web-based Braden Scale training on reliability and precision of assessments varied according to familiarity with the scale. With training, new users of the scale made reliable assessments 84% of the time and significantly improved precision of their assessments. The reliability and precision of Braden Scale risk assessments made by its regular users was unaffected by training. Technology-assisted Braden Scale training improved both reliability and precision of risk assessments made by new users of the scale, but had virtually no effect on the reliability or precision of risk assessments made by regular users of the instrument. Further research is needed to determine best approaches for improving reliability and precision of Braden Scale assessments made by its regular users.
An end-to-end communications architecture for condition-based maintenance applications
NASA Astrophysics Data System (ADS)
Kroculick, Joseph
2014-06-01
This paper explores challenges in implementing an end-to-end communications architecture for Condition-Based Maintenance Plus (CBM+) data transmission which aligns with the Army's Network Modernization Strategy. The Army's Network Modernization strategy is based on rolling out network capabilities which connect the smallest unit and Soldier level to enterprise systems. CBM+ is a continuous improvement initiative over the life cycle of a weapon system or equipment to improve the reliability and maintenance effectiveness of Department of Defense (DoD) systems. CBM+ depends on the collection, processing and transport of large volumes of data. An important capability that enables CBM+ is an end-to-end network architecture that enables data to be uploaded from the platform at the tactical level to enterprise data analysis tools. To connect end-to-end maintenance processes in the Army's supply chain, a CBM+ network capability can be developed from available network capabilities.
Civil helicopter propulsion system reliability and engine monitoring technology assessments
NASA Technical Reports Server (NTRS)
Murphy, J. A.; Zuk, J.
1982-01-01
A study to reduce operating costs of helicopters, particularly directed at the maintenance of the propulsion subsystem, is presented. The tasks of the study consisted of problem definition refinement, technology solutions, diagnostic system concepts, and emergency power augmentation. Quantifiable benefits (reduced fuel consumption, on-condition engine maintenance, extended drive system overhaul periods, and longer oil change intervals) would increase the initial cost by $43,000, but the benefit of $24.46 per hour would result in breakeven at 1758 hours. Other benefits not capable of being quantified but perhaps more important include improved aircraft avilability due to reduced maintenance time, potential for increased operating limits due to continuous automatic monitoring of gages, and less time and fuel required to make engine power checks. The most important improvement is the on-condition maintenance program, which will require the development of algorithms, equipment, and procedures compatible with all operating environments.
Comparison of Antivenom Dosing Strategies for Rattlesnake Envenomation.
Spyres, Meghan B; Skolnik, Aaron B; Moore, Elizabeth C; Gerkin, Richard D; Padilla-Jones, Angela; Ruha, Anne-Michelle
2018-06-01
This study compares maintenance with clinical- and laboratory-triggered (as-needed [PRN]) antivenom dosing strategies with regard to patient-centered outcomes after rattlesnake envenomation. This is a retrospective cohort study of adult rattlesnake envenomations treated at a regional toxicology center. Data on demographics, envenomation details, antivenom administration, length of stay, and laboratory and clinical outcomes were compared between the PRN and maintenance groups. Primary outcomes were hospital length of stay and total antivenom used, with a hypothesis of no difference between the two dosing strategies. A single regional toxicology center PATIENTS:: Three-hundred ten adult patients envenomated by rattlesnakes between 2007 and 2014 were included. Patients were excluded if no antivenom was administered or for receiving an antivenom other than Crofab (BTG International, West Conshohocken, PA). This is a retrospective study of rattlesnake envenomations treated with and without maintenance antivenom dosing. One-hundred forty-eight in the maintenance group and 162 in the PRN group were included. There was no difference in demographics or baseline envenomation severity or hemotoxicity (32.7% vs 40.5%; respectively; p = 0.158) between the two groups. Comparing the PRN with the maintenance group, less antivenom was used (8 [interquartile range, 6-12] vs 16 [interquartile range, 12-18] vials, respectively; p < 0.001), and hospital length of stay was shorter (27 hr [interquartile range, 20-44 hr] vs 34 hr [interquartile range, 24-43 hr], respectively; p = 0.014). There were no differences in follow-up outcomes of readmission, retreatment, or bleeding and surgical complications. Hospital length of stay was shorter, and less antivenom was used in patients receiving a PRN antivenom dosing strategy after rattlesnake envenomation.
Discrete Address Beacon System (DABS) Software System Reliability Modeling and Prediction.
1981-06-01
Service ( ATARS ) module because of its interim status. Reliability prediction models for software modules were derived and then verified by matching...System (A’iCR3BS) and thus can be introduced gradually and economically without ma jor olper- ational or procedural change. Since DABS uses monopulse...lineanaly- sis tools or are ured during maintenance or pre-initialization were not modeled because they are not part of the mission software. The ATARS
Stormwater and Wastewater Infrastructure Monitoring Test Bed
The growing application of stormwater and wastewater management in urban and urbanizing environments is increasing the demand for monitoring technologies and systems that can provide reliable performance data, in real-time or near real-time, for operation and maintenance decision...
Swalley canal ice detection system : final report.
DOT National Transportation Integrated Search
1990-01-01
This report evaluates the reliability of information provided by a "SCAN 16" surface condition analyzer. SCAN systems are designed to inform highway maintenance personnel when frost, ice and snow are present on a roadway surface or bridge deck. The s...
A guide to onboard checkout. Volume 2: Environmental control and life support
NASA Technical Reports Server (NTRS)
1971-01-01
A description of space station equipment for environmental control and life support is presented. Reliability and maintenance procedures are reviewed. Failure analysis and checkout tests are discussed. The strategy for software checkout is noted.
20 CFR 670.200 - Who decides where Job Corps centers will be located?
Code of Federal Regulations, 2014 CFR
2014-04-01
... 20 Employees' Benefits 4 2014-04-01 2014-04-01 false Who decides where Job Corps centers will be... LABOR (CONTINUED) THE JOB CORPS UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Site Selection and Protection and Maintenance of Facilities § 670.200 Who decides where Job Corps centers will be located? (a...
Ward, Dianne S; Mazzucca, Stephanie; McWilliams, Christina; Hales, Derek
2015-09-26
Early care and education (ECE) centers are important settings influencing young children's diet and physical activity (PA) behaviors. To better understand their impact on diet and PA behaviors as well as to evaluate public health programs aimed at ECE settings, we developed and tested the Environment and Policy Assessment and Observation - Self-Report (EPAO-SR), a self-administered version of the previously validated, researcher-administered EPAO. Development of the EPAO-SR instrument included modification of items from the EPAO, community advisory group and expert review, and cognitive interviews with center directors and classroom teachers. Reliability and validity data were collected across 4 days in 3-5 year old classrooms in 50 ECE centers in North Carolina. Center teachers and directors completed relevant portions of the EPAO-SR on multiple days according to a standardized protocol, and trained data collectors completed the EPAO for 4 days in the centers. Reliability and validity statistics calculated included percent agreement, kappa, correlation coefficients, coefficients of variation, deviations, mean differences, and intraclass correlation coefficients (ICC), depending on the response option of the item. Data demonstrated a range of reliability and validity evidence for the EPAO-SR instrument. Reporting from directors and classroom teachers was consistent and similar to the observational data. Items that produced strongest reliability and validity estimates included beverages served, outside time, and physical activity equipment, while items such as whole grains served and amount of teacher-led PA had lower reliability (observation and self-report) and validity estimates. To overcome lower reliability and validity estimates, some items need administration on multiple days. This study demonstrated appropriate reliability and validity evidence for use of the EPAO-SR in the field. The self-administered EPAO-SR is an advancement of the measurement of ECE settings and can be used by researchers and practitioners to assess the nutrition and physical activity environments of ECE settings.
NASA Astrophysics Data System (ADS)
Aquino, J.
2014-12-01
The National Science Foundation (NSF) provides the National Center for Atmospheric Research (NCAR) Earth Observing Laboratory (EOL) funding for the operation, maintenance and upgrade of two research aircraft: the NSF/NCAR High-performance Instrumented Airborne Platform for Environmental Research (HIAPER) Gulfstream V and the NSF/NCAR Hercules C-130. A suite of in-situ and remote sensing airborne instruments housed at the EOL Research Aviation Facility (RAF) provide a basic set of measurements that are typically deployed on most airborne field campaigns. In addition, instruments to address more specific research requirements are provided by collaborating participants from universities, industry, NASA, NOAA or other agencies. The data collected are an important legacy of these field campaigns. A comprehensive metadata database and integrated cyber-infrastructure, along with a robust data workflow that begins during the field phase and extends to long-term archival (current aircraft data holdings go back to 1967), assures that: all data and associated software are safeguarded throughout the data handling process; community standards of practice for data stewardship and software version control are followed; simple and timely community access to collected data and associated software tools are provided; and the quality of the collected data is preserved, with the ultimate goal of supporting research and the reproducibility of published results. The components of this data system to be presented include: robust, searchable web access to data holdings; reliable, redundant data storage; web-based tools and scripts for efficient creation, maintenance and update of data holdings; access to supplemental data and documentation; storage of data in standardized data formats; comprehensive metadata collection; mature version control; human-discernable storage practices; and procedures to inform users of changes. In addition, lessons learned, shortcomings, and desired upgrades will be discussed.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 4 2011-10-01 2011-10-01 false Review of the quality of care of risk-basis health maintenance organizations and competitive medical plans. 476.72 Section 476.72 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) QUALITY IMPROVEMENT...
POLLUTION PREVENTION OPPORTUNITY ASSESSMENT - U.S. COAST GUARD AVIATION TRAINING CENTER - MOBILE, AL
An assessment of pollution prevention opportunities at the U.S. Coast Guard Aviation Training Center in Mobile, AL, identified waste reduction opportunities in five major processing areas: flight simulator operation, aircraft maintenance, aircraft fueling, aircraft washing, and...
Environmental Learning Centers: A Template.
ERIC Educational Resources Information Center
Vozick, Eric
1999-01-01
Provides a working model, or template, for community-based environmental learning centers (ELCs). The template presents a philosophy as well as a plan for staff and administration operations, educational programming, and financial support. The template also addresses "green" construction and maintenance of buildings and grounds and…
ERIC Educational Resources Information Center
Reese, Susan
2003-01-01
Describes the fiber optics programs at the Career and Technical Center in Berlin, Pennsylvania and the Charles S. Monroe Technology Center in Loudoun County, Virginia. Discusses the involvement of the Fiber Optic Association with education, research and development, manufacturing, sales, distribution, installation, and maintenance of fiber optic…
DOT National Transportation Integrated Search
2010-04-01
Distribution centers (DC) have become more common in Texas over the past decade. As : major generators of large truck traffic, DCs can increase design and maintenance requirements of : Texas highway facilities. This handbook contains guidelines for u...
77 FR 47670 - Amended Certification Regarding Eligibility To Apply for Worker Adjustment Assistance
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-09
... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-75,151; TA-W-75,151A] Amended... Reliability Center, A Subsidiary of Navistar International Corporation, Truck Division, Including All On-Site... Reliability Center, a Subsidiary of Navistar International Corporation, Truck Division, 3033 Wayne Trace, Fort...
78 FR 58449 - Generator Requirements at the Transmission Interface
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-24
... Connection Requirements), FAC-003-3 (Transmission Vegetation Management), PRC-004- 2.1a (Analysis and... and Generation Protection System Maintenance and Testing). The modifications improve reliability... Standards FAC-001-1 (Facility Connection Requirements), FAC-003-3 (Transmission Vegetation Management), PRC...
Code of Federal Regulations, 2011 CFR
2011-01-01
..., or reliability on the borrower's electric power system or other electric power systems interconnected to the borrower's electric power system. The Agency encourages borrowers to consider model policy... ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Interconnection of Distributed Resources § 1730.61 RUS policy...
Evaluation of Arsenic Removal Technology: Arsenic Demonstration Program
Specific objectives of this program are to evaluate the reliability of the arsenic technologies of small scale systems; to gauge the simplicity of system operations, maintenance and operator skill; to determine the cost-effectiveness of the treatment technologies; and to characte...
Code of Federal Regulations, 2010 CFR
2010-01-01
..., or reliability on the borrower's electric power system or other electric power systems interconnected to the borrower's electric power system. The Agency encourages borrowers to consider model policy... ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Interconnection of Distributed Resources § 1730.61 RUS policy...
Defense transportation : more reliable information key to managing airlift services more efficiently
DOT National Transportation Integrated Search
2000-02-01
The Department of Defense's (DOD) guidance provides that the Air Mobility Command's airlift costs associated with its peacetime mission (operations and maintenance) are to be funded through a transportation working capital fund. Under the working cap...
High-temperature pump-motor assembly
NASA Technical Reports Server (NTRS)
Colker, C.; Waldron, W.
1971-01-01
Assembly pumps liquid sodium-potassium /NaK/ eutectic at 950 K for up to 20,000 hours. Design features include - high operating-temperature capability, zero leakage, process fluid lubricant/coolant, insulation system compatible with ionizing radiation environments, and reliability and long life without maintenance.
New York City Transit Authority automated transit infrastructure maintenance demonstration.
DOT National Transportation Integrated Search
2009-04-01
The objective of this pilot project was to demonstrate that the safety and reliability of the New York City : Transit transportation system can be improved by automating the correlation and analysis of disparate : track related data. Through the use ...
Risk-based asset management methodology for highway infrastructure systems.
DOT National Transportation Integrated Search
2004-01-01
Maintaining the infrastructure of roads, highways, and bridges is paramount to ensuring that these assets will remain safe and reliable in the future. If maintenance costs remain the same or continue to escalate, and additional funding is not made av...
Guide to Operating and Maintaining EnergySmart Schools
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Through a commitment to high performance, school districts are discovering that smart energy choices can create lasting benefits for students, communities, and the environment. For example, an energy efficient school district with 4,000 students can save as much as $160,000 a year in energy costs. Over 10 years, those savings can reach $1.6 million, translating into the ability to hire more teachers, purchase more textbooks and computers, or invest in additional high performance facilities. Beyond these bottomline benefits, schools can better foster student health, decrease absenteeism, and serve as centers of community life. The U.S. Department of Energy's EnergySmart Schoolsmore » Program promotes a 30 percent improvement in existing school energy use. It also encourages the building of new schools that exceed code (ASHRAE 90.11999) by 50 percent or more. The program provides resources like this Guide to Operating and Maintaining EnergySmart Schools to assist school decisionmakers in planning, financing, operating, and maintaining energy efficient, high performance schools. It also offers education and training for building industry professionals. Operations and maintenance refer to all scheduled and unscheduled actions for preventing equipment failure or decline with the goal of increasing efficiency, reliability, and safety. A preventative maintenance program is the organized and planned performance of maintenance activities in order to prevent system or production problems or failures from occurring. In contrast, deferred maintenance or reactive maintenance (also called diagnostic or corrective maintenance) is conducted to address an existing problem. This guide is a primary resource for developing and implementing a districtor schoolwide operations and maintenance (O&M) program that focuses on energy efficiency. The EnergySmart Schools Solutions companion CD contains additional supporting information for design, renovation, and retrofit projects. The objective of this guide is to provide organizational and technical information for integrating energy and high performance facility management into existing O&M practices. The guide allows users to adapt and implement suggested O&M strategies to address specific energy efficiency goals. It recognizes and expands on existing tools and resources that are widely used throughout the high performance school industry. External resources are referenced throughout the guide and are also listed within the EnergySmart Schools O&M Resource List (Appendix J). While this guide emphasizes the impact of the energy efficiency component of O&M, it encourages taking a holistic approach to maintaining a high-performance school. This includes considering various environmental factors where energy plays an indirect or direct role. For example, indoor air quality, site selection, building orientation, and water efficiency should be considered. Resources to support these overlapping aspects will be cited throughout the guide.« less
Operational Interventions to Maintenance Error
NASA Technical Reports Server (NTRS)
Kanki, Barbara G.; Walter, Diane; Dulchinos, VIcki
1997-01-01
A significant proportion of aviation accidents and incidents are known to be tied to human error. However, research of flight operational errors has shown that so-called pilot error often involves a variety of human factors issues and not a simple lack of individual technical skills. In aircraft maintenance operations, there is similar concern that maintenance errors which may lead to incidents and accidents are related to a large variety of human factors issues. Although maintenance error data and research are limited, industry initiatives involving human factors training in maintenance have become increasingly accepted as one type of maintenance error intervention. Conscientious efforts have been made in re-inventing the team7 concept for maintenance operations and in tailoring programs to fit the needs of technical opeRAtions. Nevertheless, there remains a dual challenge: 1) to develop human factors interventions which are directly supported by reliable human error data, and 2) to integrate human factors concepts into the procedures and practices of everyday technical tasks. In this paper, we describe several varieties of human factors interventions and focus on two specific alternatives which target problems related to procedures and practices; namely, 1) structured on-the-job training and 2) procedure re-design. We hope to demonstrate that the key to leveraging the impact of these solutions comes from focused interventions; that is, interventions which are derived from a clear understanding of specific maintenance errors, their operational context and human factors components.
Reduction of Maintenance Error Through Focused Interventions
NASA Technical Reports Server (NTRS)
Kanki, Barbara G.; Walter, Diane; Rosekind, Mark R. (Technical Monitor)
1997-01-01
It is well known that a significant proportion of aviation accidents and incidents are tied to human error. In flight operations, research of operational errors has shown that so-called "pilot error" often involves a variety of human factors issues and not a simple lack of individual technical skills. In aircraft maintenance operations, there is similar concern that maintenance errors which may lead to incidents and accidents are related to a large variety of human factors issues. Although maintenance error data and research are limited, industry initiatives involving human factors training in maintenance have become increasingly accepted as one type of maintenance error intervention. Conscientious efforts have been made in re-inventing the "team" concept for maintenance operations and in tailoring programs to fit the needs of technical operations. Nevertheless, there remains a dual challenge: to develop human factors interventions which are directly supported by reliable human error data, and to integrate human factors concepts into the procedures and practices of everyday technical tasks. In this paper, we describe several varieties of human factors interventions and focus on two specific alternatives which target problems related to procedures and practices; namely, 1) structured on-the-job training and 2) procedure re-design. We hope to demonstrate that the key to leveraging the impact of these solutions comes from focused interventions; that is, interventions which are derived from a clear understanding of specific maintenance errors, their operational context and human factors components.
NASA Technical Reports Server (NTRS)
Wiener, Earl L.
1988-01-01
The aims and methods of aircraft cockpit automation are reviewed from a human-factors perspective. Consideration is given to the mixed pilot reception of increased automation, government concern with the safety and reliability of highly automated aircraft, the formal definition of automation, and the ground-proximity warning system and accidents involving controlled flight into terrain. The factors motivating automation include technology availability; safety; economy, reliability, and maintenance; workload reduction and two-pilot certification; more accurate maneuvering and navigation; display flexibility; economy of cockpit space; and military requirements.
2011-02-11
on TF39 engines, which are typically used for C-5 Galaxy aircraft; T56 engines, which are typically used for C-130 aircraft; and fuel accessories on...conducting separate cost-benefit analyses for the TF39 and T56 engine maintenance work. Under Air Force guidance for depot-level source-of-repair selection...Force has not developed specific risk mitigation plans for the TF39 or T56 engines because it is still assessing how the work will be performed
Nagel, Corey; Beach, Jack; Iribagiza, Chantal; Thomas, Evan A
2015-12-15
In rural sub-Saharan Africa, where handpumps are common, 10-67% are nonfunctional at any one time, and many never get repaired. Increased reliability requires improved monitoring and responsiveness of maintenance providers. In 2014, 181 cellular enabled water pump use sensors were installed in three provinces of Rwanda. In three arms, the nominal maintenance model was compared against a "best practice" circuit rider model, and an "ambulance" service model. In only the ambulance model was the sensor data available to the implementer, and used to dispatch technicians. The study ran for seven months in 2014-2015. In the study period, the nominal maintenance group had a median time to successful repair of approximately 152 days, with a mean per-pump functionality of about 68%. In the circuit rider group, the median time to successful repair was nearly 57 days, with a per-pump functionality mean of nearly 73%. In the ambulance service group, the successful repair interval was nearly 21 days with a functionality mean of nearly 91%. An indicative cost analysis suggests that the cost per functional pump per year is approximately similar between the three models. However, the benefits of reliable water service may justify greater focus on servicing models over installation models.
DOT National Transportation Integrated Search
2000-01-01
This document contains an updated and expanded version of the Automation chapter of the Human Factors Design Guide. A research team of human factors experts evaluated the existing guidelines for relevance, clarity, and usability. The research team dr...
Samant, Y; Lanjewar, H; Parker, L; Block, D; Stein, B; Tomar, G
2007-01-01
The potency of oral polio vaccine (OPV), a heat-labile vaccine, is preserved by the cold chain. The Vaccine Vial Monitor, a heat-sensitive label, is critical to the monitoring and maintenance of the cold chain. This study was conducted to evaluate the relationship between the adequacy of cold chain infrastructure and the proper use of Vaccine Vial Monitor in a rural district of India. Forty-six health centers in a rural district were included in our evaluation of the cold chain equipment and the Vaccine Vial Monitors. Cold chain equipment and vaccine vials within each health center were evaluated for adherence to WHO cold chain maintenance protocols and the Vaccine Vial Monitor stage, respectively. Among the 46 health centers, Vaccine Vial Monitor stage I was found at 58% of the health centers, 33% of the health centers reported stage II and 9% reported a stage III, indicating weaknesses in the cold chain mechanism Cold chain for the OPV was not adequately maintained at primary and sub-health centers in this rural district. Well maintained ice packs and vaccine carriers will help ensure delivery and availability of a safe and potent vaccine to children in rural areas of India.
NASA Astrophysics Data System (ADS)
Yang, Qi; Zou, Dehua; Zhang, Jianjun; Li, Hui; Chen, Jianping; Li, Jinliang
2017-05-01
Four transmission lines on the same tower are widely used because of their obvious economic and social benefits. But it also has high power supply reliability, so the choice of reasonable maintenance mode is particularly important. In this paper, we deducted the maintenance influence of the energized line to non-energized line, calculated and analyzed protection measures of non-energized singular line of 500kV double-circuit transmission line on the same tower with ATP software, and calculated field intensity distribution of typical operating position of the energized double-circuit transmission line with the finite element software. The calculation shows that when using the outage maintenance method, hanging both ground current and personal security line can reduce the current flowing through the operator’s body effectively. When using the live maintenance method, the field intensity of operator body strengths up to 383.69kV/m, The operator needs to wear shielding cloth with at least 43.08 dB shielding efficiency, in order to meet the security requirements.
49 CFR 639.27 - Minimum criteria.
Code of Federal Regulations, 2010 CFR
2010-10-01
... dollar value to any non-financial factors that are considered by using performance-based specifications... used where possible and appropriate: (a) Operation costs; (b) Reliability of service; (c) Maintenance... related to timing of acquisition of asset. (h) Value of asset at expiration of the lease. ...
DOT National Transportation Integrated Search
2008-01-01
Reliable predictions of the seasonal high : groundwater table (SHGWT) at potential : construction sites are critical for roadway : designs. Maximum SHGWT levels can affect the : construction and maintenance of roads, and : the design and operation of...
49 CFR 193.2625 - Corrosion protection.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 3 2011-10-01 2011-10-01 false Corrosion protection. 193.2625 Section 193.2625...: FEDERAL SAFETY STANDARDS Maintenance § 193.2625 Corrosion protection. (a) Each operator shall determine which metallic components could, unless corrosion is controlled, have their integrity or reliability...
HOW GOOD ARE MY DATA? INFORMATION QUALITY ASSESSMENT METHODOLOGY
Quality assurance techniques used in software development and hardware maintenance/reliability help to ensure that data in a computerized information management system are maintained well. However, information workers may not know the quality of the data resident in their inf...
49 CFR 193.2625 - Corrosion protection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 3 2013-10-01 2013-10-01 false Corrosion protection. 193.2625 Section 193.2625...: FEDERAL SAFETY STANDARDS Maintenance § 193.2625 Corrosion protection. (a) Each operator shall determine which metallic components could, unless corrosion is controlled, have their integrity or reliability...
49 CFR 193.2625 - Corrosion protection.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 3 2012-10-01 2012-10-01 false Corrosion protection. 193.2625 Section 193.2625...: FEDERAL SAFETY STANDARDS Maintenance § 193.2625 Corrosion protection. (a) Each operator shall determine which metallic components could, unless corrosion is controlled, have their integrity or reliability...
49 CFR 193.2625 - Corrosion protection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 3 2014-10-01 2014-10-01 false Corrosion protection. 193.2625 Section 193.2625...: FEDERAL SAFETY STANDARDS Maintenance § 193.2625 Corrosion protection. (a) Each operator shall determine which metallic components could, unless corrosion is controlled, have their integrity or reliability...
Code of Federal Regulations, 2010 CFR
2010-10-01
... and/or distribution service, quality assurance, system reliability, system operation and maintenance... CONTRACTING ACQUISITION OF UTILITY SERVICES Acquiring Utility Services 41.202 Procedures. (a) Prior to executing a utility service contract, the contracting officer shall comply with parts 6 and 7 and 41.201 (d...
Energy Advantages for Green Schools
ERIC Educational Resources Information Center
Griffin, J. Tim
2012-01-01
Because of many advantages associated with central utility systems, school campuses, from large universities to elementary schools, have used district energy for decades. District energy facilities enable thermal and electric utilities to be generated with greater efficiency and higher system reliability, while requiring fewer maintenance and…
ERIC Educational Resources Information Center
Rifkin, Kenneth I.; And Others
The purpose of the simulated maintenance task environment is to provide a means for training and job performance testing of the flight line weapon control systems mechanic/technician for the F-111A aircraft. It provides practice in flight line equipment checkout, troubleshooting, and removal and replacement of line replaceable units in the…
The purpose of this SOP is to describe procedures for using and maintaining the local area network (LAN) and related microcomputer equipment at the HRP Site of the Arizona Prevention Center. These methods were used for all data operations and maintenance routines during the Ariz...
Jekauc, Darko; Völkle, Manuel; Wagner, Matthias O.; Mess, Filip; Reiner, Miriam; Renner, Britta
2015-01-01
In the processes of physical activity (PA) maintenance specific predictors are effective, which differ from other stages of PA development. Recently, Physical Activity Maintenance Theory (PAMT) was specifically developed for prediction of PA maintenance. The aim of the present study was to evaluate the predictability of the future behavior by the PAMT and compare it with the Theory of Planned Behavior (TPB) and Social Cognitive Theory (SCT). Participation rate in a fitness center was observed for 101 college students (53 female) aged between 19 and 32 years (M = 23.6; SD = 2.9) over 20 weeks using a magnetic card. In order to predict the pattern of participation TPB, SCT and PAMT were used. A latent class zero-inflated Poisson growth curve analysis identified two participation patterns: regular attenders and intermittent exercisers. SCT showed the highest predictive power followed by PAMT and TPB. Impeding aspects as life stress and barriers were the strongest predictors suggesting that overcoming barriers might be an important aspect for working out on a regular basis. Self-efficacy, perceived behavioral control, and social support could also significantly differentiate between the participation patterns. PMID:25717313
Android Platform Based Smartphones for a Logistical Remote Association Repair Framework
Lien, Shao-Fan; Wang, Chun-Chieh; Su, Juhng-Perng; Chen, Hong-Ming; Wu, Chein-Hsing
2014-01-01
The maintenance of large-scale systems is an important issue for logistics support planning. In this paper, we developed a Logistical Remote Association Repair Framework (LRARF) to aid repairmen in keeping the system available. LRARF includes four subsystems: smart mobile phones, a Database Management System (DBMS), a Maintenance Support Center (MSC) and wireless networks. The repairman uses smart mobile phones to capture QR-codes and the images of faulty circuit boards. The captured QR-codes and images are transmitted to the DBMS so the invalid modules can be recognized via the proposed algorithm. In this paper, the Linear Projective Transform (LPT) is employed for fast QR-code calibration. Moreover, the ANFIS-based data mining system is used for module identification and searching automatically for the maintenance manual corresponding to the invalid modules. The inputs of the ANFIS-based data mining system are the QR-codes and image features; the output is the module ID. DBMS also transmits the maintenance manual back to the maintenance staff. If modules are not recognizable, the repairmen and center engineers can obtain the relevant information about the invalid modules through live video. The experimental results validate the applicability of the Android-based platform in the recognition of invalid modules. In addition, the live video can also be recorded synchronously on the MSC for later use. PMID:24967603
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hatchell, Brian K.; Mauss, Fredrick J.; Amaya, Ivan A.
Military missiles are exposed to many sources of mechanical vibration that can affect system reliability, safety, and mission effectiveness. The U. S. Army Aviation and Missile Research Development and Engineering Center (AMRDEC) has been developing missile health monitoring systems to assess and improve reliability, reduce life cycle costs, and increase system readiness. One of the most significant exposures to vibration occurs when the missile is being carried by a helicopter or other aviation platform, which is a condition known as captive carry. Recording the duration of captive carry exposure during the missile’s service life can enable the implementation of predictivemore » maintenance and resource management programs. Since the vibration imparted by each class of helicopter varies in frequency and amplitude, tracking the vibration exposure from each helicopter separately can help quantify the severity and harmonic content of the exposure. Under the direction of AMRDEC staff, engineers at the Pacific Northwest National Laboratory have developed a Captive Carry Health Monitor (CCHM) for the Hellfire II missile. The CCHM is an embedded usage monitoring device installed on the outer skin of the Hellfire II missile to record the cumulative hours the host missile has been in captive carry mode. To classify the vibration by class of helicopter, the CCHM analyzes the amplitude and frequency content of the vibration with the Goertzel algorithm to detect the presence of distinctive rotor harmonics. Cumulative usage data are accessible in theater from an external display; monthly usage histograms are accessible through an internal download connector. This paper provides an overview of the CCHM electrical and package design, describes field testing and data analysis techniques used to monitor captive carry identify and the class of helicopter, and discusses the potential application of missile health and usage data for real-time reliability analysis and fleet management.« less
A Framework for Assessing the Reusability of Hardware (Reusable Rocket Engines)
NASA Technical Reports Server (NTRS)
Childress-Thompson, Rhonda; Farrington, Philip; Thomas, Dale
2016-01-01
Within the space flight community, reusability has taken center stage as the new buzzword. In order for reusable hardware to be competitive with its expendable counterpart, two major elements must be closely scrutinized. First, recovery and refurbishment costs must be lower than the development and acquisition costs. Additionally, the reliability for reused hardware must remain the same (or nearly the same) as "first use" hardware. Therefore, it is imperative that a systematic approach be established to enhance the development of reusable systems. However, before the decision can be made on whether it is more beneficial to reuse hardware or to replace it, the parameters that are needed to deem hardware worthy of reuse must be identified. For reusable hardware to be successful, the factors that must be considered are reliability (integrity, life, number of uses), operability (maintenance, accessibility), and cost (procurement, retrieval, refurbishment). These three factors are essential to the successful implementation of reusability while enabling the ability to meet performance goals. Past and present strategies and attempts at reuse within the space industry will be examined to identify important attributes of reusability that can be used to evaluate hardware when contemplating reusable versus expendable options. This paper will examine why reuse must be stated as an initial requirement rather than included as an afterthought in the final design. Late in the process, changes in the overall objective/purpose of components typically have adverse effects that potentially negate the benefits. A methodology for assessing the viability of reusing hardware will be presented by using the Space Shuttle Main Engine (SSME) to validate the approach. Because reliability, operability, and costs are key drivers in making this critical decision, they will be used to assess requirements for reuse as applied to components of the SSME.
Design for reliability: NASA reliability preferred practices for design and test
NASA Technical Reports Server (NTRS)
Lalli, Vincent R.
1994-01-01
This tutorial summarizes reliability experience from both NASA and industry and reflects engineering practices that support current and future civil space programs. These practices were collected from various NASA field centers and were reviewed by a committee of senior technical representatives from the participating centers (members are listed at the end). The material for this tutorial was taken from the publication issued by the NASA Reliability and Maintainability Steering Committee (NASA Reliability Preferred Practices for Design and Test. NASA TM-4322, 1991). Reliability must be an integral part of the systems engineering process. Although both disciplines must be weighed equally with other technical and programmatic demands, the application of sound reliability principles will be the key to the effectiveness and affordability of America's space program. Our space programs have shown that reliability efforts must focus on the design characteristics that affect the frequency of failure. Herein, we emphasize that these identified design characteristics must be controlled by applying conservative engineering principles.
Orbit Transfer Rocket Engine Technology Program: Advanced engine study, task D.1/D.3
NASA Technical Reports Server (NTRS)
Martinez, A.; Erickson, C.; Hines, B.
1986-01-01
Concepts for space maintainability of OTV engines were examined. An engine design was developed which was driven by space maintenance requirements and by a failure mode and effects (FME) analysis. Modularity within the engine was shown to offer cost benefits and improved space maintenance capabilities. Space operable disconnects were conceptualized for both engine change-out and for module replacement. Through FME mitigation the modules were conceptualized to contain the least reliable and most often replaced engine components. A preliminary space maintenance plan was developed around a controls and condition monitoring system using advanced sensors, controls, and condition monitoring concepts. A complete engine layout was prepared satisfying current vehicle requirements and utilizing projected component advanced technologies. A technology plan for developing the required technology was assembled.
Phase 111A Crew Interface Specifications Development for Inflight Maintenance and Stowage Functions
NASA Technical Reports Server (NTRS)
Carl, John G.
1973-01-01
This report presents the findings and data products developed during the Phase IIIA Crew Interface Specification Study for Inflight Maintenance and Stowage Functions, performed by General Electric for the NASA, Johnson Space Center with a set of documentation that can be used as definitive guidelines to improve the present process of defining, controlling and managing flight crew interface requirements that are related to inflight maintenance (including assembly and servicing) and stowage functions. During the Phase IIIA contract period, the following data products were developed: 1) Projected NASA Crew Procedures/Flight Data File Development Process. 2) Inflight Maintenance Management Process Description. 3) Preliminary Draft, General Specification, Inflight Maintenance Management Requirements. 4) Inflight Maintenance Operational Process Description. 5) Preliminary Draft, General Specification, Inflight Maintenance Task and Support Requirements Analysis. 6) Suggested IFM Data Processing Reports for Logistics Management The above Inflight Maintenance data products have been developed during the Phase IIIA study after review of Space Shuttle Program Documentation, including the Level II Integrated Logistics Requirements and other DOD and NASA data relative to Payloads Accommodations and Satellite On-Orbit Servicing. These Inflight Maintenance data products were developed to be in consonance with Space Shuttle Program technical and management requirements.
ERIC Educational Resources Information Center
Peterson, Roland L.; And Others
The centralized secondary center pattern of inter-school district cooperation is examined in this third of four case studies addressing access of rural students to vocational education. The report identifies essential features of this form of cooperation, details factors facilitating/impeding the operation/maintenance of the cooperative…
Computer Disaster Recovery Planning.
ERIC Educational Resources Information Center
Clark, Orvin R.
Arguing that complete, reliable, up-to-date system documentation is critical for every data processing environment, this paper on computer disaster recovery planning begins by discussing the importance of such documentation both for recovering from a systems crash, and for system maintenance and enhancement. The various components of system…
DOT National Transportation Integrated Search
2014-02-01
The Alaska Department of Transportation and Public Facilities began implementation of a Maintenance Decision Support System in an : effort to improve snow and ice control in the Fairbanks area. As part of the project the reliability of the weather fo...
Gray, Vicki L; Ivanova, Tanya D; Garland, S Jayne
2014-01-01
Knowing the reliability of the center of pressure (COP) is important for interpreting balance deficits post-stroke, especially when the balance deficits can necessitate the use of short duration trials. The novel aspect of this reliability study was to examine the center of pressure measures using two adjacent force platforms between and within sessions in stroke and controls. After stroke, it is important to understand the contribution of the paretic and non-paretic leg to the motor control of standing balance. Because there is a considerable body of knowledge on COP reliability on a single platform, we chose to examine reliability using two adjacent platforms which has not been examined previously in stroke. Twenty participants post-stroke and 22 controls performed an arm raise, load drop and quiet stance balance task while standing on two adjacent force platforms, on two separate days. Intraclass correlations coefficient (ICC2,1) and percentage standard error of measurement (SEM%) were calculated for COP velocity, ellipse area, anterior-posterior (AP) displacement, and medial-lateral (ML) displacement. Between sessions, COP velocity was the most reliable with high ICCs and low SEM% across groups and tasks and ellipse area was less reliable with low ICCs across groups and tasks. COP measures were less reliable during the arm raise than load drop post-stroke. Within session reliability was high for COP velocity and ML displacement requiring no more than six trials across tasks. The COP velocity was the most reliable measure with high ICCs between sessions and the high reliability was achieved with fewer trials in both groups in a single session. Copyright © 2014 Elsevier B.V. All rights reserved.
NASA Astrophysics Data System (ADS)
Chen, Yen-Luan; Chang, Chin-Chih; Sheu, Dwan-Fang
2016-04-01
This paper proposes the generalised random and age replacement policies for a multi-state system composed of multi-state elements. The degradation of the multi-state element is assumed to follow the non-homogeneous continuous time Markov process which is a continuous time and discrete state process. A recursive approach is presented to efficiently compute the time-dependent state probability distribution of the multi-state element. The state and performance distribution of the entire multi-state system is evaluated via the combination of the stochastic process and the Lz-transform method. The concept of customer-centred reliability measure is developed based on the system performance and the customer demand. We develop the random and age replacement policies for an aging multi-state system subject to imperfect maintenance in a failure (or unacceptable) state. For each policy, the optimum replacement schedule which minimises the mean cost rate is derived analytically and discussed numerically.
NASA Technical Reports Server (NTRS)
Miller, Ralinda R.
2016-01-01
This document presents the Corrective Measures Implementation (CMI) Year 10 Annual Report for implementation of corrective measures at the Hypergol Maintenance Facility (HMF) Hazardous Waste South Staging Areas at Kennedy Space Center, Florida. The work is being performed by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity (IDIQ) NNK12CA15B, Task Order (TO) 07. Mr. Harry Plaza, P.E., of NASA's Environmental Assurance Branch is the Remediation Project Manager for John F. Kennedy Space Center. The Tetra Tech Program Manager is Mr. Mark Speranza, P.E., and the Tetra Tech Project Manager is Robert Simcik, P.E.
42 CFR 405.2470 - Reports and maintenance of records.
Code of Federal Regulations, 2013 CFR
2013-10-01
... initial reporting period, the clinic or center must submit an estimate of budgeted costs and visits for..., including the allowable costs actually incurred for the period and the actual number of visits for rural... estimated costs and visits for rural health clinic services or Federally qualified health center services...
42 CFR 405.2470 - Reports and maintenance of records.
Code of Federal Regulations, 2011 CFR
2011-10-01
... initial reporting period, the clinic or center must submit an estimate of budgeted costs and visits for..., including the allowable costs actually incurred for the period and the actual number of visits for rural... estimated costs and visits for rural health clinic services or Federally qualified health center services...
42 CFR 405.2470 - Reports and maintenance of records.
Code of Federal Regulations, 2012 CFR
2012-10-01
... initial reporting period, the clinic or center must submit an estimate of budgeted costs and visits for..., including the allowable costs actually incurred for the period and the actual number of visits for rural... estimated costs and visits for rural health clinic services or Federally qualified health center services...
Integrating School-Based Health Centers into Managed Care in Massachusetts.
ERIC Educational Resources Information Center
Hacker, Karen
1996-01-01
This paper examines key steps in the integration of school-based health centers in Massachusetts into managed care and describes the administrative and clinical impact of these relationships. Strategies include enhancing communication between SBHCs and health maintenance organizations, standardizing school-based care, and mandating integration of…
Probabilistic simulation of the human factor in structural reliability
NASA Technical Reports Server (NTRS)
Shah, Ashwin R.; Chamis, Christos C.
1991-01-01
Many structural failures have occasionally been attributed to human factors in engineering design, analyses maintenance, and fabrication processes. Every facet of the engineering process is heavily governed by human factors and the degree of uncertainty associated with them. Factors such as societal, physical, professional, psychological, and many others introduce uncertainties that significantly influence the reliability of human performance. Quantifying human factors and associated uncertainties in structural reliability require: (1) identification of the fundamental factors that influence human performance, and (2) models to describe the interaction of these factors. An approach is being developed to quantify the uncertainties associated with the human performance. This approach consists of a multi factor model in conjunction with direct Monte-Carlo simulation.
ERIC Educational Resources Information Center
Huang, Po-Hsien; Weng, Li-Jen
2012-01-01
A procedure for estimating the reliability of test scores in the context of ecological momentary assessment (EMA) was proposed to take into account the characteristics of EMA measures. Two commonly used test scores in EMA were considered: the aggregated score (AGGS) and the within-person centered score (WPCS). Conceptually, AGGS and WPCS represent…
Wald, Ron; McArthur, Eric; Chertow, Glenn M.; Harel, Shai; Gruneir, Andrea; Fischer, Hadas D.; Garg, Amit X.; Perl, Jeffrey; Nash, Danielle M.; Silver, Samuel; Bell, Chaim M.
2015-01-01
Clinical outcomes after a hospital discharge are poorly defined for patients receiving maintenance in-center (outpatient) hemodialysis. To describe the proportion and characteristics of these patients who are rehospitalized, visit an emergency department, or die within 30 days after discharge from an acute hospitalization, we conducted a population-based study of all adult patients receiving maintenance in-center hemodialysis who were discharged between January 1, 2003, and December 31, 2011, from 157 acute care hospitals in Ontario, Canada. For patients with more than one hospitalization, we randomly selected a single hospitalization as the index hospitalization. Of the 11,177 patients included in the final cohort, 1926 (17%) were rehospitalized, 2971 (27%) were treated in the emergency department, and 840 (7.5%) died within 30 days of discharge. Complications of type 2 diabetes mellitus were the most common reason for rehospitalization, whereas heart failure was the most common reason for an emergency department visit. In multivariable analysis using a cause-specific Cox proportional hazards model, the following characteristics were associated with 30-day rehospitalization: older age, the number of hospital admissions in the preceding 6 months, the number of emergency department visits in the preceding 6 months, higher Charlson comorbidity index score, and the receipt of mechanical ventilation during the index hospitalization. Thus, a large proportion of patients receiving maintenance in-center hemodialysis will be readmitted or visit an emergency room within 30 days of an acute hospitalization. A focus on improving care transitions from the inpatient setting to the outpatient dialysis unit may improve outcomes and reduce healthcare costs. PMID:25855772
Health management and controls for Earth-to-orbit propulsion systems
NASA Astrophysics Data System (ADS)
Bickford, R. L.
1995-03-01
Avionics and health management technologies increase the safety and reliability while decreasing the overall cost for Earth-to-orbit (ETO) propulsion systems. New ETO propulsion systems will depend on highly reliable fault tolerant flight avionics, advanced sensing systems and artificial intelligence aided software to ensure critical control, safety and maintenance requirements are met in a cost effective manner. Propulsion avionics consist of the engine controller, actuators, sensors, software and ground support elements. In addition to control and safety functions, these elements perform system monitoring for health management. Health management is enhanced by advanced sensing systems and algorithms which provide automated fault detection and enable adaptive control and/or maintenance approaches. Aerojet is developing advanced fault tolerant rocket engine controllers which provide very high levels of reliability. Smart sensors and software systems which significantly enhance fault coverage and enable automated operations are also under development. Smart sensing systems, such as flight capable plume spectrometers, have reached maturity in ground-based applications and are suitable for bridging to flight. Software to detect failed sensors has reached similar maturity. This paper will discuss fault detection and isolation for advanced rocket engine controllers as well as examples of advanced sensing systems and software which significantly improve component failure detection for engine system safety and health management.
Helium refrigerator maintenance and reliability at the OPAL cold neutron source
NASA Astrophysics Data System (ADS)
Thiering, Russell; Taylor, David; Lu, Weijian
2012-06-01
Australia's first Cold Neutron Source (CNS) is a major asset to its nuclear research program. The CNS, and associated helium refrigerator, was commissioned in 2006 and is operated at the Open Pool Light Water nuclear Reactor (OPAL). The OPAL CNS operates a 20K, 5 kW Brayton cycle helium refrigerator. In this paper relevant experiences from helium refrigerator operation, maintenance and repair are presented along with the lessons learnt from a series of technical investigations. Turbine failure, due to volatile organic species, is discussed along with the related compressor oil degradation and oil separation efficiency.
Research requirements for development of regenerative engines for helicopters
DOE Office of Scientific and Technical Information (OSTI.GOV)
Semple, R.D.
1976-12-01
The improved specific fuel consumption of the regenerative engine was compared to a simple-cycle turboshaft engine. The performance improvement and fuel saving are obtained at the expense of increased engine weight, development and production costs, and maintenance costs. Costs and schedules are estimated for the elements of the research and development program. Interaction of the regenerative engine with other technology goals for an advanced civil helicopter is examined, including its impact on engine noise, hover and cruise performance, helicopter empty weight, drive-system efficiency and weight, one-engine-inoperative hover capability, and maintenance and reliability.
Research requirements for development of regenerative engines for helicopters
NASA Technical Reports Server (NTRS)
Semple, R. D.
1976-01-01
The improved specific fuel consumption of the regenerative engine was compared to a simple-cycle turboshaft engine. The performance improvement and fuel saving are obtained at the expense of increased engine weight, development and production costs, and maintenance costs. Costs and schedules are estimated for the elements of the research and development program. Interaction of the regenerative engine with other technology goals for an advanced civil helicopter is examined, including its impact on engine noise, hover and cruise performance, helicopter empty weight, drive-system efficiency and weight, one-engine-inoperative hover capability, and maintenance and reliability.
Damage tolerance and structural monitoring for wind turbine blades
McGugan, M.; Pereira, G.; Sørensen, B. F.; Toftegaard, H.; Branner, K.
2015-01-01
The paper proposes a methodology for reliable design and maintenance of wind turbine rotor blades using a condition monitoring approach and a damage tolerance index coupling the material and structure. By improving the understanding of material properties that control damage propagation it will be possible to combine damage tolerant structural design, monitoring systems, inspection techniques and modelling to manage the life cycle of the structures. This will allow an efficient operation of the wind turbine in terms of load alleviation, limited maintenance and repair leading to a more effective exploitation of offshore wind. PMID:25583858
A double candidate survivable routing protocol for HAP network
NASA Astrophysics Data System (ADS)
He, Panfeng; Li, Chunyue; Ni, Shuyan
2016-11-01
To improve HAP network invulnerability, and at the same time considering the quasi-dynamic topology in HAP network, a simple and reliable routing protocol is proposed in the paper. The protocol firstly uses a double-candidate strategy for the next-node select to provide better robustness. Then during the maintenance stage, short hello packets instead of long routing packets are used only to check link connectivity in the quasi-dynamic HAP network. The route maintenance scheme based on short hello packets can greatly reduce link spending. Simulation results based on OPNET demonstrate the effectiveness of the proposed routing protocol.
Maintenance and suppression of chaos by weak harmonic perturbations: a unified view.
Chacón, R
2001-02-26
General results concerning maintenance or enhancement of chaos are presented for dissipative systems subjected to two harmonic perturbations (one chaos inducing and the other chaos enhancing). The connection with previous results on chaos suppression is also discussed in a general setting. It is demonstrated that, in general, a second harmonic perturbation can reliably play an enhancer or inhibitor role by solely adjusting its initial phase. Numerical results indicate that general theoretical findings concerning periodic chaos-inducing perturbations also work for aperiodic chaos-inducing perturbations, and in arrays of identical chaotic coupled oscillators.
Evaluation metrics for biostatistical and epidemiological collaborations.
Rubio, Doris McGartland; Del Junco, Deborah J; Bhore, Rafia; Lindsell, Christopher J; Oster, Robert A; Wittkowski, Knut M; Welty, Leah J; Li, Yi-Ju; Demets, Dave
2011-10-15
Increasing demands for evidence-based medicine and for the translation of biomedical research into individual and public health benefit have been accompanied by the proliferation of special units that offer expertise in biostatistics, epidemiology, and research design (BERD) within academic health centers. Objective metrics that can be used to evaluate, track, and improve the performance of these BERD units are critical to their successful establishment and sustainable future. To develop a set of reliable but versatile metrics that can be adapted easily to different environments and evolving needs, we consulted with members of BERD units from the consortium of academic health centers funded by the Clinical and Translational Science Award Program of the National Institutes of Health. Through a systematic process of consensus building and document drafting, we formulated metrics that covered the three identified domains of BERD practices: the development and maintenance of collaborations with clinical and translational science investigators, the application of BERD-related methods to clinical and translational research, and the discovery of novel BERD-related methodologies. In this article, we describe the set of metrics and advocate their use for evaluating BERD practices. The routine application, comparison of findings across diverse BERD units, and ongoing refinement of the metrics will identify trends, facilitate meaningful changes, and ultimately enhance the contribution of BERD activities to biomedical research. Copyright © 2011 John Wiley & Sons, Ltd.
The transition of ground-based space environmental effects testing to the space environment
NASA Technical Reports Server (NTRS)
Zaat, Stephen V.; Schaefer, Glen A.; Wallace, John F.
1991-01-01
The goal of the space flight program at the Center for Commercial Development of Space (CCDS)--Materials for Space Structures is to provide environmentally stable structural materials to support the continued humanization and commercialization of the space frontier. Information on environmental stability will be obtained through space exposure, evaluation, documentation, and subsequent return to the supplier of the candidate material for internal investigation. This program provides engineering and scientific service to space systems development firms and also exposes CCDS development candidate materials to space environments representative of in-flight conditions. The maintenance of a technological edge in space for NASA suggests the immediate search for space materials that maintain their structural integrity and remain environmentally stable. The materials being considered for long-lived space structures are complex, high strength/weight ratio composites. In order for these new candidate materials to qualify for use in space structures, they must undergo strenuous testing to determine their reliability and stability when subjected to the space environment. Ultraviolet radiation, atomic oxygen, debris/micrometeoroids, charged particles radiation, and thermal fatigue all influence the design of space structural materials. The investigation of these environmental interactions is the key purpose of this center. Some of the topics discussed with respect to the above information include: the Space Transportation System, mission planning, spaceborne experiments, and space flight payloads.
Product modular design incorporating preventive maintenance issues
NASA Astrophysics Data System (ADS)
Gao, Yicong; Feng, Yixiong; Tan, Jianrong
2016-03-01
Traditional modular design methods lead to product maintenance problems, because the module form of a system is created according to either the function requirements or the manufacturing considerations. For solving these problems, a new modular design method is proposed with the considerations of not only the traditional function related attributes, but also the maintenance related ones. First, modularity parameters and modularity scenarios for product modularity are defined. Then the reliability and economic assessment models of product modularity strategies are formulated with the introduction of the effective working age of modules. A mathematical model used to evaluate the difference among the modules of the product so that the optimal module of the product can be established. After that, a multi-objective optimization problem based on metrics for preventive maintenance interval different degrees and preventive maintenance economics is formulated for modular optimization. Multi-objective GA is utilized to rapidly approximate the Pareto set of optimal modularity strategy trade-offs between preventive maintenance cost and preventive maintenance interval difference degree. Finally, a coordinate CNC boring machine is adopted to depict the process of product modularity. In addition, two factorial design experiments based on the modularity parameters are constructed and analyzed. These experiments investigate the impacts of these parameters on the optimal modularity strategies and the structure of module. The research proposes a new modular design method, which may help to improve the maintainability of product in modular design.
NASA Astrophysics Data System (ADS)
Sadeghi, J.; Motieyan-Najar, M. E.; Zakeri, J. A.; Yousefi, B.; Mollazadeh, M.
2018-04-01
Ballast plays an important role in the stability of railway track systems. The effectiveness of the ballast in maintaining the track stability is very much dependent on its mechanical conditions. The available ballast maintenance approaches are mainly based on only track geometry conditions (such as track profile) which do not sufficiently reflect the ballast mechanical behaviors. That is, the ballast potential of degradation (i.e., ballast long term behaviors) has been omitted. This makes the effectiveness of the current ballast maintenance approach questionable, indicating a need for a more comprehensive and effective ballast conditions assessment technique. In response to this need, two ballast condition indices based on ballast geometry degradation (BGI) and the level of ballast fouling (BFI) as the main indicators of ballast mechanical behavior were developed. The BGI is a function of the standard deviations of track alignment, unevenness and twist. The BFI was developed based on the data obtained from the ground penetration radar (GPR). Making use of the new indices, a more reliable maintenance algorithm was developed. Through illustrations of the applicability of the new maintenance algorithm in a railway line, it was shown that the new algorithm causes a considerable improvement in the maintenance effectiveness and an increase in the life cycle of railway tracks by making more effective allocation of resources and more accurate maintenance planning.
Davenport, Paul B; Carter, Kimberly F; Echternach, Jeffrey M; Tuck, Christopher R
2018-02-01
High-reliability organizations (HROs) demonstrate unique and consistent characteristics, including operational sensitivity and control, situational awareness, hyperacute use of technology and data, and actionable process transformation. System complexity and reliance on information-based processes challenge healthcare organizations to replicate HRO processes. This article describes a healthcare organization's 3-year journey to achieve key HRO features to deliver high-quality, patient-centric care via an operations center powered by the principles of high-reliability data and software to impact patient throughput and flow.
Which factors affect software projects maintenance cost more?
Dehaghani, Sayed Mehdi Hejazi; Hajrahimi, Nafiseh
2013-03-01
The software industry has had significant progress in recent years. The entire life of software includes two phases: production and maintenance. Software maintenance cost is increasingly growing and estimates showed that about 90% of software life cost is related to its maintenance phase. Extraction and considering the factors affecting the software maintenance cost help to estimate the cost and reduce it by controlling the factors. In this study, the factors affecting software maintenance cost were determined then were ranked based on their priority and after that effective ways to reduce the maintenance costs were presented. This paper is a research study. 15 software related to health care centers information systems in Isfahan University of Medical Sciences and hospitals function were studied in the years 2010 to 2011. Among Medical software maintenance team members, 40 were selected as sample. After interviews with experts in this field, factors affecting maintenance cost were determined. In order to prioritize the factors derived by AHP, at first, measurement criteria (factors found) were appointed by members of the maintenance team and eventually were prioritized with the help of EC software. Based on the results of this study, 32 factors were obtained which were classified in six groups. "Project" was ranked the most effective feature in maintenance cost with the highest priority. By taking into account some major elements like careful feasibility of IT projects, full documentation and accompany the designers in the maintenance phase good results can be achieved to reduce maintenance costs and increase longevity of the software.
International classification of reliability for implanted cochlear implant receiver stimulators.
Battmer, Rolf-Dieter; Backous, Douglas D; Balkany, Thomas J; Briggs, Robert J S; Gantz, Bruce J; van Hasselt, Andrew; Kim, Chong Sun; Kubo, Takeshi; Lenarz, Thomas; Pillsbury, Harold C; O'Donoghue, Gerard M
2010-10-01
To design an international standard to be used when reporting reliability of the implanted components of cochlear implant systems to appropriate governmental authorities, cochlear implant (CI) centers, and for journal editors in evaluating manuscripts involving cochlear implant reliability. The International Consensus Group for Cochlear Implant Reliability Reporting was assembled to unify ongoing efforts in the United States, Europe, Asia, and Australia to create a consistent and comprehensive classification system for the implanted components of CI systems across manufacturers. All members of the consensus group are from tertiary referral cochlear implant centers. None. A clinically relevant classification scheme adapted from principles of ISO standard 5841-2:2000 originally designed for reporting reliability of cardiac pacemakers, pulse generators, or leads. Standard definitions for device failure, survival time, clinical benefit, reduced clinical benefit, and specification were generated. Time intervals for reporting back to implant centers for devices tested to be "out of specification," categorization of explanted devices, the method of cumulative survival reporting, and content of reliability reports to be issued by manufacturers was agreed upon by all members. The methodology for calculating Cumulative survival was adapted from ISO standard 5841-2:2000. The International Consensus Group on Cochlear Implant Device Reliability Reporting recommends compliance to this new standard in reporting reliability of implanted CI components by all manufacturers of CIs and the adoption of this standard as a minimal reporting guideline for editors of journals publishing cochlear implant research results.
Development of an Environment for Software Reliability Model Selection
1992-09-01
now is directed to other related problems such as tools for model selection, multiversion programming, and software fault tolerance modeling... multiversion programming, 7. Hlardware can be repaired by spare modules, which is not. the case for software, 2-6 N. Preventive maintenance is very important
[Reliability of static posturography in elderly persons].
Bauer, C M; Gröger, I; Rupprecht, R; Tibesku, C O; Gassmann, K G
2010-08-01
Static posturography is used to quantify body sway. It is used to assess the balance of elderly persons who are prone to falls. There is still no general opinion concerning the reliability of force platform measurements. The aim of this study was to test the reliability of force platform parameters when measuring elderly persons. The reliability of 11 force platform parameters was tested measuring 30 elderly persons. The following parameters were calculated: mean speed of center of pressure displacement in mm/s, length of sway in mm, sway area in mm(2), amplitudes of center of pressure movement, the axis of oscillation in degrees and the person's angles of inclination in degrees. Three measurements were taken on the same day, with a resting period of 2 min. Four different test conditions were used: normal standing and narrow stand with eyes open and eyes closed, respectively. Reliability was determined by using intraclass correlation coefficients. Six parameters had excellent reliability with a correlation coefficient of >0.9: mean speed of center of pressure movement during narrow stand, area of sway during narrow stand, length of sway during normal and narrow stand, and the angle of inclination in the sagittal plane during normal stand and narrow stand. The condition "narrow stand eyes closed" proved to be the most reliable test position. Six parameters proved to have excellent reliability and are recommended to be used in further investigations. Narrow stand with eyes closed should be used as the test position. The tested protocol proved to be reliable. Whether these parameters can be used to predict falls in elderly persons remains to be investigated.
An Intercenter Comparison of Nasolabial Appearance Including a Center Using Nasoalveolar Molding.
Peanchitlertkajorn, Supakit; Mercado, Ana; Daskalogiannakis, John; Hathaway, Ronald; Russell, Kathleen; Semb, Gunvor; Shaw, William; Lamichane, Manish; Cohen, Marilyn; Long, Ross E
2018-05-01
To compare nasolabial appearance outcomes of patients with complete unilateral cleft lip and palate (CUCLP) in preadolescence from 4 cleft centers including a center using nasoalveolar molding (NAM) and primary nasal reconstruction. Retrospective cohort study. Four cleft centers in North America. 135 subjects with repaired CUCLP. Frontal and profile facial pictures were assessed using the Asher-McDade rating scale. Intra- and interrater reliability were tested using weighted Kappa statistics. Median scores by center were compared with Kruskal-Wallis statistics. Intrarater reliability scores were moderate to good. Interrater reliability scores were moderate. Significant differences ( P < .05) among centers were found. For nasal form, center G (median = 2.83) had better scores than centers C and D (C median = 3.33, D median = 3.17). For nose symmetry, center G had better scores (median = 2.33) than all other centers (B median = 2.67, C median = 2.83, D median = 2.83). For vermillion border, center G had better scores (median = 2.58) than centers B and C (B median = 3.17, C median = 3.17). For nasolabial profile, center G (median score = 2.67) had better scores than center C (median = 3.00). For total nasolabial score, center G (median = 2.67) had better scores than all other centers (B median = 2.83, C median = 3, D median = 2.83). The protocol followed by center G, the only center that performed NAM and primary nasal reconstruction, produced better results in all categories when compared to center C, the only center that did not perform presurgical orthopedics or lip/nose revisions. When compared to centers that performed traditional presurgical orthopedics and surgical revisions (B and D), center G was not consistently better in all categories. As with other uncontrolled, retrospective intercenter studies, it is not possible to attribute the outcomes to a specific protocol component.
2010-06-02
Operations and maintenance OSHA Occupational Safety and Health Administration P2 Pollution prevention Pb Lead PFC Perfluorocarbon PG& E Pacific... lounge , a warehouse, Chapter 2. Description of the Proposed Action and Alternatives Final Environmental Assessment - California Space Center...Pacific Gas & Electric (PG& E ) for the entire Center, once a planned line is completed by PG& E . Acceptance of this approach is dependent on
Time-Tagged Risk/Reliability Assessment Program for Development and Operation of Space System
NASA Astrophysics Data System (ADS)
Kubota, Yuki; Takegahara, Haruki; Aoyagi, Junichiro
We have investigated a new method of risk/reliability assessment for development and operation of space system. It is difficult to evaluate risk of spacecraft, because of long time operation, maintenance free and difficulty of test under the ground condition. Conventional methods are FMECA, FTA, ETA and miscellaneous. These are not enough to assess chronological anomaly and there is a problem to share information during R&D. A new method of risk and reliability assessment, T-TRAP (Time-tagged Risk/Reliability Assessment Program) is proposed as a management tool for the development and operation of space system. T-TRAP consisting of time-resolved Fault Tree and Criticality Analyses, upon occurrence of anomaly in the system, facilitates the responsible personnel to quickly identify the failure cause and decide corrective actions. This paper describes T-TRAP method and its availability.
Effect of Entropy Generation on Wear Mechanics and System Reliability
NASA Astrophysics Data System (ADS)
Gidwani, Akshay; James, Siddanth; Jagtap, Sagar; Karthikeyan, Ram; Vincent, S.
2018-04-01
Wear is an irreversible phenomenon. Processes such as mutual sliding and rolling between materials involve entropy generation. These processes are monotonic with respect to time. The concept of entropy generation is further quantified using Degradation Entropy Generation theorem formulated by Michael D. Bryant. The sliding-wear model can be extrapolated to different instances in order to further provide a potential analysis of machine prognostics as well as system and process reliability for various processes besides even mere mechanical processes. In other words, using the concept of ‘entropy generation’ and wear, one can quantify the reliability of a system with respect to time using a thermodynamic variable, which is the basis of this paper. Thus in the present investigation, a unique attempt has been made to establish correlation between entropy-wear-reliability which can be useful technique in preventive maintenance.
NASA Research Bearing on Jet Engine Reliability
NASA Technical Reports Server (NTRS)
Mason, S. S.; Ault, G. M.; Pinkel, B.
1959-01-01
Turbojet engine reliability has long been an intense interest to the military users of this type of aircraft propulsion. With the recent inauguration of commercial jet transport this subject has assumed a new dimension of importance. In January l96 the Lewis Research Center of the NASA (then the MACA) published the results of an extensive study on the factors that affect the opera- center dot tional reliability of turbojet engines (ref. 1). At that time the report was classified Confidential. In July l98 this report was declassified. It is thus appropriate at this time to present some of the highlights of the studies described in the NASA report. In no way is it intended to outline the complete contents of the report; rather it is hoped to direct attention to it among those who are center dot directly concerned with this problem. Since the publication of our study over three years ago, the NASA has completed a number of additional investigations that bear significantly on this center dot subject. A second object of this paper, therefore, is to summarize the results of these recent studies and to interpret their significance in relation to turbojet operational reliability.
Automatisms in EMIR instrument to improve operation, safety and maintenance
NASA Astrophysics Data System (ADS)
Fernández Izquierdo, Patricia; Núñez Cagigal, Miguel; Barreto Rodríguez, Roberto; Martínez Rey, Noelia; Santana Tschudi, Samuel; Barreto Cabrera, Maria; Patrón Recio, Jesús; Garzón López, Francisco
2014-08-01
EMIR is the NIR imager and multiobject spectrograph being built as a common user instrument for the 10-m class GTC. Big cryogenic instruments demand a reliable design and a specific hardware and software to increase its safety and productivity. EMIR vacuum, cooling and heating systems are monitored and partially controlled by a Programmable Logic Controller (PLC) in industrial format with a touch screen. The PLC aids the instrument operator in the maintenance tasks recovering autonomously vacuum if required or proposing preventive maintenance actions. The PLC and its associated hardware improve EMIR safety having immediate reactions against eventual failure modes in the instrument or in external supplies, including hardware failures during the heating procedure or failure in the PLC itself. EMIR PLC provides detailed information periodically about status and alarms of vacuum and cooling components or external supplies.
Detecting Corrosion Under Paint and Insulation
NASA Technical Reports Server (NTRS)
Bastin, Gary L.
2011-01-01
Corrosion is a major concern at the Kennedy Space Center in Florida due to the proximity of the center to the Atlantic Ocean and to salt water lagoons. High humidity, salt fogs, and ocean breezes, provide an ideal environment in which painted steel structures become corroded. Maintenance of painted steel structures is a never-ending process.
41 CFR 101-30.503 - Maintenance actions required.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., the agency shall submit data to GSA, the Defense Logistics Agency (DLA), the Veterans Administration... submission to DLSC, except that civilian agencies receiving supply support on an item from a DLA center or... DLA center using DD Form 1685, Data Exchange and/or Proposed Revision of Catalog Data, or to the VA...
41 CFR 101-30.503 - Maintenance actions required.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., the agency shall submit data to GSA, the Defense Logistics Agency (DLA), the Veterans Administration... submission to DLSC, except that civilian agencies receiving supply support on an item from a DLA center or... DLA center using DD Form 1685, Data Exchange and/or Proposed Revision of Catalog Data, or to the VA...
41 CFR 101-30.503 - Maintenance actions required.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., the agency shall submit data to GSA, the Defense Logistics Agency (DLA), the Veterans Administration... submission to DLSC, except that civilian agencies receiving supply support on an item from a DLA center or... DLA center using DD Form 1685, Data Exchange and/or Proposed Revision of Catalog Data, or to the VA...
41 CFR 101-30.503 - Maintenance actions required.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., the agency shall submit data to GSA, the Defense Logistics Agency (DLA), the Veterans Administration... submission to DLSC, except that civilian agencies receiving supply support on an item from a DLA center or... DLA center using DD Form 1685, Data Exchange and/or Proposed Revision of Catalog Data, or to the VA...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
... conferences; the cost of teaching and research materials; the cost of acquisition, maintenance, and preservation of library collections; the cost of bringing visiting scholars and faculty to the center to teach... propose teaching or research activities conducted by visiting scholars and faculty in one of the seventy...
Evaluation of the Multiple Careers Magnet and Assessment Centers at William B. Carrell, 1978-79.
ERIC Educational Resources Information Center
Maples, Wayne; And Others
The report evaluates Texas' Multiple Careers Magnet Center (MCMC), a part time program to provide special education secondary students with career training. It is explained that students enter one of six career education clusters: furniture repair and upholstery, general construction trades, building and grounds maintenance, laundry and dry…
USDA-ARS?s Scientific Manuscript database
The USDA-ARS, National Center for Genetic Resources Preservation maintains the voucher germplasm of Plant Variety Protection (PVP) potato (S. tuberosum) cultivars registered with the U.S. Plant Variety Protection Office. The potato cultivars are deposited at the Center as tissue culture and are main...
NASA Astrophysics Data System (ADS)
Friedenauer, Axel; Karpov, Vladimir; Wei, Daoping; Hager, Manfred; Ernstberger, Bernhard; Clements, Wallace R. L.; Kaenders, Wilhelm G.
2012-07-01
Large telescopes equipped with adaptive optics require 20-25W CW 589-nm sources with emission linewidths of ~5 MHz. These Guide Star (GS) lasers should also be highly reliable and simple to operate and maintain for many years at the top of a mountain facility. Under contract from ESO, industrial partners TOPTICA and MPBC are nearing completion of the development of GS lasers for the ESO VLT, with delivery of the first of four units scheduled for December 2012. We report on the design and performance of the fully-engineered Pre-Production Unit (PPU), including system reliability/availability analysis, the successfully-concluded qualification testing, long-term component and system level tests and long-term maintenance and support planning. The chosen approach is based on ESO's patented narrow-band Raman Fiber Amplifier (EFRA) technology. A master oscillator signal from a linearly-polarized TOPTICA 20-mW, 1178-nm CW diode laser, with stabilized emission frequency and controllable linewidth up to a few MHz, is amplified in an MPBC polarization-maintaining (PM) RFA pumped by a high-power 1120-nm PM fiber laser. With efficient stimulated Brillouin scattering suppression, an unprecedented 40W of narrow-band RFA output has been obtained. This is then mode-matched into a resonant-cavity doubler with a free-spectral-range matching the sodium D2a to D2b separation, allowing simultaneous generation of an additional frequency component (D2b line) to re-pump the sodium atom electronic population. With this technique, the return flux can be increased without having to resort to electro-optical modulators and without the risk of introducing optical wave front distortions. The demonstrated output powers with doubling efficiencies >80% at 589 nm easily exceed the 20W design goal and require less than 700 W of electrical power. In summary, the fiber-based guide star lasers provide excellent beam quality and are modular, turn-key, maintenance-free, reliable, efficient, and ruggedized devices whose compactness allows installation directly onto the launch telescope structure.
The Pattern and Dynamics of the Meridional Overturning Circulation in the Upper Ocean
2008-09-01
Atlantic . Figure 4a shows that the center of meridional overturning circulation occurs at a level of about one kilometer. Circulation is weak at...maintenance of the meridional overturning circulation in the Atlantic Ocean. 5. Global Simulation The most exciting experiment would be to fully model the...mechanisms responsible for the strength and maintenance of the meridional overturning circulation in the Atlantic Ocean are not
10 CFR 40.38 - Ineligibility of certain applicants.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Ineligibility of certain applicants. 40.38 Section 40.38 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF SOURCE MATERIAL License Applications § 40.38... security of the United States; or (2) The maintenance of a reliable and economical domestic source of...
Data-Driven Decision Making in Practice: The NCAA Injury Surveillance System
ERIC Educational Resources Information Center
Klossner, David; Corlette, Jill; Agel, Julie; Marshall, Stephen W.
2009-01-01
Putting data-driven decision making into practice requires the use of consistent and reliable data that are easily accessible. The systematic collection and maintenance of accurate information is an important component in developing policy and evaluating outcomes. Since 1982, the National Collegiate Athletic Association (NCAA) has been collecting…
Advanced gas turbines breathe new life into vintage reheat units
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-04-01
This article describes the repowering of reheat units with advanced gas turbines. The topics of the article include a project overview, plant configuration including heat recovery steam generators and the plant-wide distributed control system, upgrade of existing steam turbines, gas turbine technology, reliability, availability, maintenance features, and training.
Noninvasive diagnosis of uremic osteodystrophy: uses and limitations.
Heaf, J G; Joffe, P; Pødenphant, J; Andersen, J R
1987-01-01
45 bone biopsies from patients with chronic uremia were reviewed to define which noninvasive investigations were of value in predicting the histological diagnosis and to quantify the spectrum of uremic bone disease at a center that has consistently used an aluminum-free dialysis bath. 17 biopsies were taken postmortem. 15 patients received conservative treatment, the rest were on maintenance dialysis. 13 patients had symptomatic bone disease. Virtually all patients with a uremia duration greater than 3 years had uremic osteodystrophy. All patients with clinical bone disease, hypercalcemia or raised alkaline phosphatase activity had osteodystrophy, but the specific histology was not indicated. Greatly raised parathyroid levels suggested secondary hyperparathyroidism, but the test was only 100% specific when 20 times normal. Total aluminum consumption was highly indicative of bone aluminum concentration (p less than 0.0001) and aluminum-related osteomalacia (5 cases), suggesting that a considerable proportion of uremic bone disease is iatrogenic. Serum aluminum was of some use in the diagnosis of aluminum-related osteomalacia, but was not wholly reliable. Bone mineral content (BMC) using both forearm measurements and total body bone mineral levels (TBBM) were assessed in 32 patients and were found to be reduced in 12, with a preponderance of secondary hyperparathyroidism. BMC and TBBM were negatively correlated to resorbing surfaces and bone formation rate, suggesting that secondary hyperparathyroidism is the uremic bone disease that represents the greatest threat to bone mass. It is concluded that while noninvasive investigations give considerable information, reliable diagnosis requires the use of histological methods.
Operations and support cost modeling of conceptual space vehicles
NASA Technical Reports Server (NTRS)
Ebeling, Charles
1994-01-01
The University of Dayton is pleased to submit this annual report to the National Aeronautics and Space Administration (NASA) Langley Research Center which documents the development of an operations and support (O&S) cost model as part of a larger life cycle cost (LCC) structure. It is intended for use during the conceptual design of new launch vehicles and spacecraft. This research is being conducted under NASA Research Grant NAG-1-1327. This research effort changes the focus from that of the first two years in which a reliability and maintainability model was developed to the initial development of an operations and support life cycle cost model. Cost categories were initially patterned after NASA's three axis work breakdown structure consisting of a configuration axis (vehicle), a function axis, and a cost axis. A revised cost element structure (CES), which is currently under study by NASA, was used to established the basic cost elements used in the model. While the focus of the effort was on operations and maintenance costs and other recurring costs, the computerized model allowed for other cost categories such as RDT&E and production costs to be addressed. Secondary tasks performed concurrent with the development of the costing model included support and upgrades to the reliability and maintainability (R&M) model. The primary result of the current research has been a methodology and a computer implementation of the methodology to provide for timely operations and support cost analysis during the conceptual design activities.
Yoshida, Takashi; Monk, Kevin J.; Katz, Donald B.
2013-01-01
The taste of foods, in particular the palatability of these tastes, exerts a powerful influence on our feeding choices. Although the lateral hypothalamus (LH) has long been known to regulate feeding behavior, taste processing in LH remains relatively understudied. Here, we examined single-unit LH responses in rats subjected to a battery of taste stimuli that differed in both chemical composition and palatability. Like neurons in cortex and amygdala, LH neurons produced a brief epoch of nonspecific responses followed by a protracted period of taste-specific firing. Unlike in cortex, however, where palatability-related information only appears 500 ms after the onset of taste-specific firing, taste specificity in LH was dominated by palatability-related firing, consistent with LH's role as a feeding center. Upon closer inspection, taste-specific LH neurons fell reliably into one of two subtypes: the first type showed a reliable affinity for palatable tastes, low spontaneous firing rates, phasic responses, and relatively narrow tuning; the second type showed strongest modulation to aversive tastes, high spontaneous firing rates, protracted responses, and broader tuning. Although neurons producing both types of responses were found within the same regions of LH, cross-correlation analyses suggest that they may participate in distinct functional networks. Our data shed light on the implementation of palatability processing both within LH and throughout the taste circuit, and may ultimately have implications for LH's role in the formation and maintenance of taste preferences and aversions. PMID:23719813
Li, Jennifer X; Yoshida, Takashi; Monk, Kevin J; Katz, Donald B
2013-05-29
The taste of foods, in particular the palatability of these tastes, exerts a powerful influence on our feeding choices. Although the lateral hypothalamus (LH) has long been known to regulate feeding behavior, taste processing in LH remains relatively understudied. Here, we examined single-unit LH responses in rats subjected to a battery of taste stimuli that differed in both chemical composition and palatability. Like neurons in cortex and amygdala, LH neurons produced a brief epoch of nonspecific responses followed by a protracted period of taste-specific firing. Unlike in cortex, however, where palatability-related information only appears 500 ms after the onset of taste-specific firing, taste specificity in LH was dominated by palatability-related firing, consistent with LH's role as a feeding center. Upon closer inspection, taste-specific LH neurons fell reliably into one of two subtypes: the first type showed a reliable affinity for palatable tastes, low spontaneous firing rates, phasic responses, and relatively narrow tuning; the second type showed strongest modulation to aversive tastes, high spontaneous firing rates, protracted responses, and broader tuning. Although neurons producing both types of responses were found within the same regions of LH, cross-correlation analyses suggest that they may participate in distinct functional networks. Our data shed light on the implementation of palatability processing both within LH and throughout the taste circuit, and may ultimately have implications for LH's role in the formation and maintenance of taste preferences and aversions.
Woolcock, Michael
2018-06-01
In rich and poor countries alike, a core challenge is building the state's capability for policy implementation. Delivering high-quality public health and health care-affordably, reliably and at scale, for all-exemplifies this challenge, since doing so requires deftly integrating refined technical skills (surgery), broad logistics management (supply chains, facilities maintenance), adaptive problem solving (curative care), and resolving ideological differences (who pays? who provides?), even as the prevailing health problems themselves only become more diverse, complex, and expensive as countries become more prosperous. However, the current state of state capability in developing countries is demonstrably alarming, with the strains and demands only likely to intensify in the coming decades. Prevailing "best practice" strategies for building implementation capability-copying and scaling putative successes from abroad-are too often part of the problem, while individual training ("capacity building") and technological upgrades (e.g. new management information systems) remain necessary but deeply insufficient. An alternative approach is outlined, one centered on building implementation capability by working iteratively to solve problems nominated and prioritized by local actors.
Automated Translation of Safety Critical Application Software Specifications into PLC Ladder Logic
NASA Technical Reports Server (NTRS)
Leucht, Kurt W.; Semmel, Glenn S.
2008-01-01
The numerous benefits of automatic application code generation are widely accepted within the software engineering community. A few of these benefits include raising the abstraction level of application programming, shorter product development time, lower maintenance costs, and increased code quality and consistency. Surprisingly, code generation concepts have not yet found wide acceptance and use in the field of programmable logic controller (PLC) software development. Software engineers at the NASA Kennedy Space Center (KSC) recognized the need for PLC code generation while developing their new ground checkout and launch processing system. They developed a process and a prototype software tool that automatically translates a high-level representation or specification of safety critical application software into ladder logic that executes on a PLC. This process and tool are expected to increase the reliability of the PLC code over that which is written manually, and may even lower life-cycle costs and shorten the development schedule of the new control system at KSC. This paper examines the problem domain and discusses the process and software tool that were prototyped by the KSC software engineers.
NASA Technical Reports Server (NTRS)
1999-01-01
The Parking Garage Automation System (PGAS) is based on a technology developed by a NASA-sponsored project called Robot sensorSkin(TM). Merritt Systems, Inc., of Orlando, Florida, teamed up with NASA to improve robots working with critical flight hardware at Kennedy Space Center in Florida. The system, containing smart sensor modules and flexible printed circuit board skin, help robots to steer clear of obstacles using a proximity sensing system. Advancements in the sensor designs are being applied to various commercial applications, including the PGAS. The system includes a smartSensor(TM) network installed around and within public parking garages to autonomously guide motorists to open facilities, and once within, to free parking spaces. The sensors use non-invasive reflective-ultrasonic technology for high accuracy, high reliability, and low maintenance. The system is remotely programmable: it can be tuned to site-specific requirements, has variable range capability, and allows remote configuration, monitoring, and diagnostics. The sensors are immune to interference from metallic construction materials, such as rebar and steel beams. Inside the garage, smart routing signs mounted overhead or on poles in front of each row of parking spots guide the motorist precisely to free spaces.
The Fuel Cell Powered Club Car Carryall
NASA Technical Reports Server (NTRS)
Eichenberg, Dennis J.
2005-01-01
The NASA Glenn Research Center initiated development of the Fuel Cell Powered Club Car Carryall as a way to reduce pollution in industrial settings, reduce fossil fuel consumption and reduce operating costs for transportation systems. The Club Car Carryall provides an inexpensive approach to advance the state of the art in electric vehicle technology in a practical application. The project transfers space technology to terrestrial use via non-traditional partners, and provides power system data valuable for future aeronautics and space applications. The work was done under the Hybrid Power Management (HPM) Program. The Carryall is a state of the art, dedicated, electric utility vehicle. Hydrogen powered proton exchange membrane (PEM) fuel cells are the primary power source. Ultracapacitors were used for energy storage as long life, maintenance free operation, and excellent low temperature performance is essential. Metal hydride hydrogen storage was used to store hydrogen in a safe and efficient low-pressure solid form. The report concludes that the Fuel Cell Powered Club Car Carryall can provide excellent performance, and that the implementation of fuel cells in conjunction with ultracapacitors in the power system can provide significant reliability and performance improvements.
Advanced aviation technology for reusable launch vehicle improvement
NASA Astrophysics Data System (ADS)
Filatyev, Alexander S.; Buzuluk, Valentin; Yanova, Olga; Ryabukha, Nikolay; Petrov, Andrey
2014-07-01
The new project of a spacecraft launcher (SL) with reusable winged 1st stage boosters (RWB) developed by Khrunichev Space Center is considered. Since SL is operated in the atmosphere only, it makes sense to employ technologies which may be new for the space industry but have been applied in aviation. Particular attention is given to RWB power-off reentry to a suitable airfield along the ascent lane instead of direct flying back to the launch site after staging, as well as a profound controlled RWB reconfiguration before reentry. The paper talks about results of integrated analysis of aerodynamics, through-optimized trajectories and masses of the RWB and SL, as well as an expert assessment of the maintenance costs sufficient to substantiate effectiveness of the recovery airfields solution in terms of the payload mass, launch reliability, and operational costs reduction. Four RWB layouts are considered, including ones with a delta- and unswept tilting wing, with and without subsonic air-breathing engines, and the original RWB-transformer. Objective peculiarities of the RWB recovery are highlighted for Russian and Kourou cosmodromes.
Measuring the impact of computer resource quality on the software development process and product
NASA Technical Reports Server (NTRS)
Mcgarry, Frank; Valett, Jon; Hall, Dana
1985-01-01
The availability and quality of computer resources during the software development process was speculated to have measurable, significant impact on the efficiency of the development process and the quality of the resulting product. Environment components such as the types of tools, machine responsiveness, and quantity of direct access storage may play a major role in the effort to produce the product and in its subsequent quality as measured by factors such as reliability and ease of maintenance. During the past six years, the NASA Goddard Space Flight Center has conducted experiments with software projects in an attempt to better understand the impact of software development methodologies, environments, and general technologies on the software process and product. Data was extracted and examined from nearly 50 software development projects. All were related to support of satellite flight dynamics ground-based computations. The relationship between computer resources and the software development process and product as exemplified by the subject NASA data was examined. Based upon the results, a number of computer resource-related implications are provided.
Failure Mode Classification for Life Prediction Modeling of Solid-State Lighting
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sakalaukus, Peter Joseph
2015-08-01
Since the passing of the Energy Independence and Security Act of 2007, the U.S. government has mandated greater energy independence which has acted as a catalyst for accelerating and facilitating research efforts toward the development and deployment of market-driven solutions for energy-saving homes, buildings and manufacturing, as well as sustainable transportation and renewable electricity generation. As part of this effort, an emphasis toward advancing solid-state lighting technology through research, development, demonstration, and commercial applications is assisting in the phase out of the common incandescent light bulb, as well as developing a more economical lighting source that is less toxic thanmore » compact fluorescent lighting. This has led lighting manufacturers to pursue SSL technologies for a wide range of consumer lighting applications. An SSL luminaire’s lifetime can be characterized in terms of lumen maintenance life. Lumen maintenance or lumen depreciation is the percentage decrease in the relative luminous flux from that of the original, pristine luminous flux value. Lumen maintenance life is the estimated operating time, in hours, when the desired failure threshold is projected to be reached at normal operating conditions. One accepted failure threshold of SSL luminaires is lumen maintenance of 70% -- a 30% reduction in the light output of the luminaire. Currently, the only approved lighting standard that puts forth a recommendation for long-term luminous flux maintenance projections towards a specified failure threshold of an SSL luminaire is the IES TM-28-14 (TM28) standard. iii TM28 was derived as a means to compare luminaires that have been tested at different facilities, research labs or companies. TM28 recommends the use of the Arrhenius equation to determine SSL device specific reaction rates from thermally driven failure mechanisms used to characterize a single failure mode – the relative change in the luminous flux output or “light power” of the SSL luminaire. The use of the Arrhenius equation necessitates two different temperature conditions, 25°C and 45°C are suggested by TM28, to determine the SSL lamp specific activation energy. One principal issue with TM28 is the lack of additional stresses or parameters needed to characterize non-temperature dependent failure mechanisms. Another principal issue with TM28 is the assumption that lumen maintenance or lumen depreciation gives an adequate comparison between SSL luminaires. Additionally, TM28 has no process for the determination of acceleration factors or lifetime estimations. Currently, a literature gap exists for established accelerated test methods for SSL devices to assess quality, reliability and durability before being introduced into the marketplace. Furthermore, there is a need for Physics-of-Failure based approaches to understand the processes and mechanisms that induce failure for the assessment of SSL reliability in order to develop generalized acceleration factors that better represent SSL product lifetime. This and the deficiencies in TM28 validate the need behind the development of acceleration techniques to quantify SSL reliability under a variety of environmental conditions. The ability to assess damage accrual and investigate reliability of SSL components and systems is essential to understanding the life time of the SSL device itself. The methodologies developed in this work increases the understanding of SSL devices iv through the investigation of component and device reliability under a variety of accelerated test conditions. The approaches for suitable lifetime predictions through the development of novel generalized acceleration factors, as well as a prognostics and health management framework, will greatly reduce the time and effort needed to produce SSL acceleration factors for the development of lifetime predictions.« less
Evaluation of reliability modeling tools for advanced fault tolerant systems
NASA Technical Reports Server (NTRS)
Baker, Robert; Scheper, Charlotte
1986-01-01
The Computer Aided Reliability Estimation (CARE III) and Automated Reliability Interactice Estimation System (ARIES 82) reliability tools for application to advanced fault tolerance aerospace systems were evaluated. To determine reliability modeling requirements, the evaluation focused on the Draper Laboratories' Advanced Information Processing System (AIPS) architecture as an example architecture for fault tolerance aerospace systems. Advantages and limitations were identified for each reliability evaluation tool. The CARE III program was designed primarily for analyzing ultrareliable flight control systems. The ARIES 82 program's primary use was to support university research and teaching. Both CARE III and ARIES 82 were not suited for determining the reliability of complex nodal networks of the type used to interconnect processing sites in the AIPS architecture. It was concluded that ARIES was not suitable for modeling advanced fault tolerant systems. It was further concluded that subject to some limitations (the difficulty in modeling systems with unpowered spare modules, systems where equipment maintenance must be considered, systems where failure depends on the sequence in which faults occurred, and systems where multiple faults greater than a double near coincident faults must be considered), CARE III is best suited for evaluating the reliability of advanced tolerant systems for air transport.
NASA Technical Reports Server (NTRS)
1991-01-01
This Handbook establishes general safety, reliability, and quality assurance (SR&QA) guidelines for use on flight and ground-based projects conducted at the Ames, Langley, and Lewis Research Centers, hereafter identified as the Office of Aeronautics, Exploration and Technology (OAET) Centers. This document is applicable to all projects and operations conducted at these Centers except for those projects covered by more restrictive provisions such as the Space Shuttle, Space Station, and unmanned spacecraft programs. This Handbook is divided into two parts. The first (Chapters 1 and 2) establishes the SR&QA guidelines applicable to the OAET Centers, and the second (Appendices A, B, C, and D) provides examples and definitions for the total SR&QA program. Each center should implement SR&QA programs using these guidelines with tailoring appropriate to the special projects conducted by each Center. This Handbook is issued in loose-leaf form and will be revised by page changes.
Interrater reliability among epilepsy centers: multicenter study of epilepsy surgery.
Haut, Sheryl R; Berg, Anne T; Shinnar, Shlomo; Cohen, Hillel W; Bazil, Carl W; Sperling, Michael R; Langfitt, John T; Pacia, Steven V; Walczak, Thaddeus S; Spencer, Susan S
2002-11-01
To measure the interrater reliability of presurgical testing and surgical decisions among epilepsy centers. Seven centers participating in an ongoing, prospective multicenter study of resective epilepsy surgery agreed to conform to a detailed protocol regarding presurgical evaluation and surgery. To assess quality assurance, each center independently reviewed 21 randomly selected surgical cases for preoperative study lateralization and localization, and surgical decisions. Interrater reliability was assessed by using intraclass correlation coefficients (ICCs), validated for use with multiple raters, and calculated in a two-way random model based on absolute agreement. Agreement for ICC values: > or = 0.75, excellent; 0.60-0.74, good; 0.40-0.59, fair; < or = 0.39, poor. One center was excluded for missing data. Agreement was excellent for extracranial EEG lateralization (0.8039), magnetic resonance imaging (MRI) lateralization (0.9521) and localization (0.9130), Wada lateralization (0.9453), and intracranial EEG localization (0.7905). Agreement was good for extracranial EEG localization (0.7384) and neuropsychological testing lateralization (0.7178) and localization (0.6891). Consensus about the decision to perform intracranial monitoring was fair (0.5397), in part reflecting one center's tendency toward intracranial monitoring. Overall agreements on whether to perform surgery (0.8311) and specific surgery recommended (0.8164) were excellent. High interrater reliability among six epilepsy centers was present for interpretation of most components of presurgical testing. Although consensus for the decision to perform intracranial monitoring was only fair, agreements for the ultimate decision about resective surgery and specific choice of resection were excellent. We believe that this study demonstrates the feasibility of implementing multicenter protocols for neurologic management, especially those involving localization, as well as protocols combining study results with clinical decision making.
Harel, Ziv; Wald, Ron; McArthur, Eric; Chertow, Glenn M; Harel, Shai; Gruneir, Andrea; Fischer, Hadas D; Garg, Amit X; Perl, Jeffrey; Nash, Danielle M; Silver, Samuel; Bell, Chaim M
2015-12-01
Clinical outcomes after a hospital discharge are poorly defined for patients receiving maintenance in-center (outpatient) hemodialysis. To describe the proportion and characteristics of these patients who are rehospitalized, visit an emergency department, or die within 30 days after discharge from an acute hospitalization, we conducted a population-based study of all adult patients receiving maintenance in-center hemodialysis who were discharged between January 1, 2003, and December 31, 2011, from 157 acute care hospitals in Ontario, Canada. For patients with more than one hospitalization, we randomly selected a single hospitalization as the index hospitalization. Of the 11,177 patients included in the final cohort, 1926 (17%) were rehospitalized, 2971 (27%) were treated in the emergency department, and 840 (7.5%) died within 30 days of discharge. Complications of type 2 diabetes mellitus were the most common reason for rehospitalization, whereas heart failure was the most common reason for an emergency department visit. In multivariable analysis using a cause-specific Cox proportional hazards model, the following characteristics were associated with 30-day rehospitalization: older age, the number of hospital admissions in the preceding 6 months, the number of emergency department visits in the preceding 6 months, higher Charlson comorbidity index score, and the receipt of mechanical ventilation during the index hospitalization. Thus, a large proportion of patients receiving maintenance in-center hemodialysis will be readmitted or visit an emergency room within 30 days of an acute hospitalization. A focus on improving care transitions from the inpatient setting to the outpatient dialysis unit may improve outcomes and reduce healthcare costs. Copyright © 2015 by the American Society of Nephrology.
ETARA PC version 3.3 user's guide: Reliability, availability, maintainability simulation model
NASA Technical Reports Server (NTRS)
Hoffman, David J.; Viterna, Larry A.
1991-01-01
A user's manual describing an interactive, menu-driven, personal computer based Monte Carlo reliability, availability, and maintainability simulation program called event time availability reliability (ETARA) is discussed. Given a reliability block diagram representation of a system, ETARA simulates the behavior of the system over a specified period of time using Monte Carlo methods to generate block failure and repair intervals as a function of exponential and/or Weibull distributions. Availability parameters such as equivalent availability, state availability (percentage of time as a particular output state capability), continuous state duration and number of state occurrences can be calculated. Initial spares allotment and spares replenishment on a resupply cycle can be simulated. The number of block failures are tabulated both individually and by block type, as well as total downtime, repair time, and time waiting for spares. Also, maintenance man-hours per year and system reliability, with or without repair, at or above a particular output capability can be calculated over a cumulative period of time or at specific points in time.
NASA Astrophysics Data System (ADS)
Lin, Yi-Kuei; Huang, Cheng-Fu
2015-04-01
From a quality of service viewpoint, the transmission packet unreliability and transmission time are both critical performance indicators in a computer system when assessing the Internet quality for supervisors and customers. A computer system is usually modelled as a network topology where each branch denotes a transmission medium and each vertex represents a station of servers. Almost every branch has multiple capacities/states due to failure, partial failure, maintenance, etc. This type of network is known as a multi-state computer network (MSCN). This paper proposes an efficient algorithm that computes the system reliability, i.e., the probability that a specified amount of data can be sent through k (k ≥ 2) disjoint minimal paths within both the tolerable packet unreliability and time threshold. Furthermore, two routing schemes are established in advance to indicate the main and spare minimal paths to increase the system reliability (referred to as spare reliability). Thus, the spare reliability can be readily computed according to the routing scheme.
2010-06-01
to result in lower maintenance and higher reliability compared with the commercially practiced options of pressure swing adsorption (PSA) or vacuum ...screen and the temperature displayed on the graph will decrease. The Knob is used to zoom the chart and scroll through historical values. For a list of...Friday ‐ Status: OK. Tinker AFB reported a FAL alarm occurs when the compressor isn’t pumping oxygen. The FAL alarm terminates when the
Damage tolerance and structural monitoring for wind turbine blades.
McGugan, M; Pereira, G; Sørensen, B F; Toftegaard, H; Branner, K
2015-02-28
The paper proposes a methodology for reliable design and maintenance of wind turbine rotor blades using a condition monitoring approach and a damage tolerance index coupling the material and structure. By improving the understanding of material properties that control damage propagation it will be possible to combine damage tolerant structural design, monitoring systems, inspection techniques and modelling to manage the life cycle of the structures. This will allow an efficient operation of the wind turbine in terms of load alleviation, limited maintenance and repair leading to a more effective exploitation of offshore wind. © 2015 The Author(s) Published by the Royal Society. All rights reserved.
Morphine reduces social cohesion in rats.
Panksepp, J; Najam, N; Soares, F
1979-08-01
The effect of low (1 mg/kg) doses of morphine on maintenance of physical proximity were evaluated in paired rats observed in a 4 square foot test arena. Morphine reliably reduced proximity maintenance time, and this was apparently not due to sedation, since the effect was unmodified by doses of amphetamine which substantially increased motor activity. The effects of naloxone were inconsistent on this measure of social motivation. In general, the results are consistent with the theoretical proposition that a brain neurochemical change which might lead to social attraction is the activation of endogenous opioid systems. When opiate activity is exogenously sustained, animals exhibit a subnormal tendency to be gregarious.
Application Research of Fault Tree Analysis in Grid Communication System Corrective Maintenance
NASA Astrophysics Data System (ADS)
Wang, Jian; Yang, Zhenwei; Kang, Mei
2018-01-01
This paper attempts to apply the fault tree analysis method to the corrective maintenance field of grid communication system. Through the establishment of the fault tree model of typical system and the engineering experience, the fault tree analysis theory is used to analyze the fault tree model, which contains the field of structural function, probability importance and so on. The results show that the fault tree analysis can realize fast positioning and well repairing of the system. Meanwhile, it finds that the analysis method of fault tree has some guiding significance to the reliability researching and upgrading f the system.
Orbit Maintenance and Navigation of Human Spacecraft at Cislunar Near Rectilinear Halo Orbits
NASA Technical Reports Server (NTRS)
Davis, Diane; Bhatt, Sagar; Howell, Kathleen; Jang, Jiann-Woei; Whitley, Ryan; Clark, Fred; Guzzetti, Davide; Zimovan, Emily; Barton, Gregg
2017-01-01
Multiple studies have concluded that Earth-Moon libration point orbits are attractive candidates for staging operations. The Near Rectilinear Halo Orbit (NRHO), a member of the Earth-Moon halo orbit family, has been singularly demonstrated to meet multi-mission architectural constraints. In this paper, the challenges associated with operating human spacecraft in the NRHO are evaluated. Navigation accuracies and human vehicle process noise effects are applied to various station keeping strategies in order to obtain a reliable orbit maintenance algorithm. Additionally, the ability to absorb missed burns, construct phasing maneuvers to avoid eclipses and conduct rendezvous and proximity operations are examined.
NASA Astrophysics Data System (ADS)
Brousset, Christine; Baudrillard, Gilles
A neural network tool was developed to automate the Non Destructive Testing (NDT) of aeronautical structures carried out with the SIAM system. The SIAM system is used to reveal splits in longitudinal metal joints on the Airbus fuselage. The integration of the neural net tool within the SIAM control system is considered possible. The automatic diagnostic should provide the operator with an aid which will permit a greater reliability of maintenance control. The diagnostic performed with this tool would be rapid;: the control of 30,000 rivets on the Airbus fuselage would take approximately 45 minutes.
Reliability evaluation of a multistate network subject to time constraint under routing policy
NASA Astrophysics Data System (ADS)
Lin, Yi-Kuei
2013-08-01
A multistate network is a stochastic network composed of multistate arcs in which each arc has several possible capacities and may fail due to failure, maintenance, etc. The quality of a multistate network depends on how to meet the customer's requirements and how to provide the service in time. The system reliability, the probability that a given amount of data can be transmitted through a pair of minimal paths (MPs) simultaneously under the time constraint, is a proper index to evaluate the quality of a multistate network. An efficient solution procedure is first proposed to calculate it. In order to further enhance the system reliability, the network administrator decides the routing policy in advance to indicate the first and the second priority pairs of MPs. The second priority pair of MPs takes charge of the transmission duty if the first fails. The system reliability under the routing policy can be subsequently evaluated.
Reliability and availability analysis of a 10 kW@20 K helium refrigerator
NASA Astrophysics Data System (ADS)
Li, J.; Xiong, L. Y.; Liu, L. Q.; Wang, H. R.; Wang, B. M.
2017-02-01
A 10 kW@20 K helium refrigerator has been established in the Technical Institute of Physics and Chemistry, Chinese Academy of Sciences. To evaluate and improve this refrigerator’s reliability and availability, a reliability and availability analysis is performed. According to the mission profile of this refrigerator, a functional analysis is performed. The failure data of the refrigerator components are collected and failure rate distributions are fitted by software Weibull++ V10.0. A Failure Modes, Effects & Criticality Analysis (FMECA) is performed and the critical components with higher risks are pointed out. Software BlockSim V9.0 is used to calculate the reliability and the availability of this refrigerator. The result indicates that compressors, turbine and vacuum pump are the critical components and the key units of this refrigerator. The mitigation actions with respect to design, testing, maintenance and operation are proposed to decrease those major and medium risks.
Training and Maintaining System-Wide Reliability in Outcome Management.
Barwick, Melanie A; Urajnik, Diana J; Moore, Julia E
2014-01-01
The Child and Adolescent Functional Assessment Scale (CAFAS) is widely used for outcome management, for providing real time client and program level data, and the monitoring of evidence-based practices. Methods of reliability training and the assessment of rater drift are critical for service decision-making within organizations and systems of care. We assessed two approaches for CAFAS training: external technical assistance and internal technical assistance. To this end, we sampled 315 practitioners trained by external technical assistance approach from 2,344 Ontario practitioners who had achieved reliability on the CAFAS. To assess the internal technical assistance approach as a reliable alternative training method, 140 practitioners trained internally were selected from the same pool of certified raters. Reliabilities were high for both practitioners trained by external technical assistance and internal technical assistance approaches (.909-.995, .915-.997, respectively). 1 and 3-year estimates showed some drift on several scales. High and consistent reliabilities over time and training method has implications for CAFAS training of behavioral health care practitioners, and the maintenance of CAFAS as a global outcome management tool in systems of care.
Technology transfer and evaluation for Space Station telerobotics
NASA Technical Reports Server (NTRS)
Price, Charles R.; Stokes, Lebarian; Diftler, Myron A.
1994-01-01
The international space station (SS) must take advantage of advanced telerobotics in order to maximize productivity and safety and to reduce maintenance costs. The Automation and Robotics Division at the NASA Lyndon B. Johnson Space Center (JSC) has designed, developed, and constructed the Automated Robotics Maintenance of Space Station (ARMSS) facility for the purpose of transferring and evaluating robotic technology that will reduce SS operation costs. Additionally, JSC had developed a process for expediting the transfer of technology from NASA research centers and evaluating these technologies in SS applications. Software and hardware system developed at the research centers and NASA sponsored universities are currently being transferred to JSC and integrated into the ARMSS for flight crew personnel testing. These technologies will be assessed relative to the SS baseline, and, after refinements, those technologies that provide significant performance improvements will be recommended as upgrades to the SS. Proximity sensors, vision algorithms, and manipulator controllers are among the systems scheduled for evaluation.
NASA Technical Reports Server (NTRS)
Sepehry-Fard, F.; Coulthard, Maurice H.
1995-01-01
The process to predict the values of the maintenance time dependent variable parameters such as mean time between failures (MTBF) over time must be one that will not in turn introduce uncontrolled deviation in the results of the ILS analysis such as life cycle cost spares calculation, etc. A minor deviation in the values of the maintenance time dependent variable parameters such as MTBF over time will have a significant impact on the logistics resources demands, International Space Station availability, and maintenance support costs. It is the objective of this report to identify the magnitude of the expected enhancement in the accuracy of the results for the International Space Station reliability and maintainability data packages by providing examples. These examples partially portray the necessary information hy evaluating the impact of the said enhancements on the life cycle cost and the availability of the International Space Station.
ERIC Educational Resources Information Center
Maiano, Christophe; Morin, Alexandre J. S.; Begarie, Jerome
2011-01-01
The purpose of this study was to test the factor validity and reliability of the Center for Epidemiologic Studies Depression Scale (CES-D) within a sample of adolescents with mild to moderate Intellectual Disability (ID). A total sample of 189 adolescents (121 boys and 68 girls), aged between 12 and 18 years old, with mild to moderate ID were…
Building an experience factory for maintenance
NASA Technical Reports Server (NTRS)
Valett, Jon D.; Condon, Steven E.; Briand, Lionel; Kim, Yong-Mi; Basili, Victor R.
1994-01-01
This paper reports the preliminary results of a study of the software maintenance process in the Flight Dynamics Division (FDD) of the National Aeronautics and Space Administration/Goddard Space Flight Center (NASA/GSFC). This study is being conducted by the Software Engineering Laboratory (SEL), a research organization sponsored by the Software Engineering Branch of the FDD, which investigates the effectiveness of software engineering technologies when applied to the development of applications software. This software maintenance study began in October 1993 and is being conducted using the Quality Improvement Paradigm (QIP), a process improvement strategy based on three iterative steps: understanding, assessing, and packaging. The preliminary results represent the outcome of the understanding phase, during which SEL researchers characterized the maintenance environment, product, and process. Findings indicate that a combination of quantitative and qualitative analysis is effective for studying the software maintenance process, that additional measures should be collected for maintenance (as opposed to new development), and that characteristics such as effort, error rate, and productivity are best considered on a 'release' basis rather than on a project basis. The research thus far has documented some basic differences between new development and software maintenance. It lays the foundation for further application of the QIP to investigate means of improving the maintenance process and product in the FDD.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2017-06-01
The goal of this guide is to support the development, maintenance, and use of accurate and reliable Technical Reference Manuals (TRMs). TRMs provide information primarily used for estimating the energy and demand savings of end-use energy efficiency measures associated with utility customer-funded efficiency programs.
Self-Alining End Supports for Energy Absorber
NASA Technical Reports Server (NTRS)
Alfaro-Bou, E.; Eichelberger, C. P.; Fasanella, E.
1986-01-01
Simple devices stabilize axially-loaded compressive members. Energyabsorbing column held by two end supports, which stabilize column and tolerate misalinement. Column absorbs excess load by collapsing lengthwise. Self-alining supports small, lightweight, and almost maintenance-free. Their use eliminates alinement problem, opening up more applications and providing higher reliability for compressively-loaded energy absorbers.
14 CFR 171.255 - Requests for IFR procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... manual that meets the requirements of § 171.273. (4) A statement of intent to meet the requirements of this subpart. (5) A showing that the ISMLS facility has an acceptable level of operational reliability... the results and of any required changes in the ISMLS facility or in the maintenance manual or...
Space shuttle program: Shuttle Avionics Integration Laboratory. Volume 7: Logistics management plan
NASA Technical Reports Server (NTRS)
1974-01-01
The logistics management plan for the shuttle avionics integration laboratory defines the organization, disciplines, and methodology for managing and controlling logistics support. Those elements requiring management include maintainability and reliability, maintenance planning, support and test equipment, supply support, transportation and handling, technical data, facilities, personnel and training, funding, and management data.
System for Odorless Disposal of Human Waste
NASA Technical Reports Server (NTRS)
Jennings, Dave; Lewis, Tod
1987-01-01
Conceptual system provides clean, hygienic storage. Disposal system stores human wastes compactly. Releases no odor or bacteria and requires no dangerous chemicals or unpleasant handling. Stabilizes waste by natural process of biodegradation in which microbial activity eventually ceases and ordors and bacteria reduced to easily contained levels. Simple and reliable and needs little maintenance.
A guide to onboard checkout. Volume 6: Structures/mechanics
NASA Technical Reports Server (NTRS)
1971-01-01
The structures and mechanical subsystem of a space station are considered. The subsystem includes basic structure (pressurization, equipment support, meteoroid protection, radiators, insulation, and docking interfaces), the docking mechanisms, spacecraft access (hatches, airlocks, and view ports), and antenna deployment mechanisms. Checkout is discussed in terms of reliability, failure analysis, and maintenance.
ERIC Educational Resources Information Center
McEntee-Atalianis, Lisa J.
2011-01-01
The concept of "Ethnolinguistic Vitality" (EV) has received variable acceptance and support since its introduction by Giles, Bourhis, and Taylor. It has especially proven to be a valuable heuristic in studies of language maintenance and shift. However, the reliability and validity of the instruments used to investigate EV, especially…
Operation of the Computer Software Management and Information Center (COSMIC)
NASA Technical Reports Server (NTRS)
1983-01-01
The major operational areas of the COSMIC center are described. Quantitative data on the software submittals, program verification, and evaluation are presented. The dissemination activities are summarized. Customer services and marketing activities of the center for the calendar year are described. Those activities devoted to the maintenance and support of selected programs are described. A Customer Information system, the COSMIC Abstract Recording System Project, and the COSMIC Microfiche Project are summarized. Operational cost data are summarized.
NASA Astrophysics Data System (ADS)
Zhong, Shuya; Pantelous, Athanasios A.; Beer, Michael; Zhou, Jian
2018-05-01
Offshore wind farm is an emerging source of renewable energy, which has been shown to have tremendous potential in recent years. In this blooming area, a key challenge is that the preventive maintenance of offshore turbines should be scheduled reasonably to satisfy the power supply without failure. In this direction, two significant goals should be considered simultaneously as a trade-off. One is to maximise the system reliability and the other is to minimise the maintenance related cost. Thus, a non-linear multi-objective programming model is proposed including two newly defined objectives with thirteen families of constraints suitable for the preventive maintenance of offshore wind farms. In order to solve our model effectively, the nondominated sorting genetic algorithm II, especially for the multi-objective optimisation is utilised and Pareto-optimal solutions of schedules can be obtained to offer adequate support to decision-makers. Finally, an example is given to illustrate the performances of the devised model and algorithm, and explore the relationships of the two targets with the help of a contrast model.