Sample records for reliability plan appendix

  1. 49 CFR Appendix A to Part 611 - Description of Measures Used for Project Evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Livable Communities initiatives and local economic activities; (5) Consideration of alternative land use... to fixed guideway systems and extensions may not be limited to a single project). (b) The stability and reliability of the proposed capital financing plan, according to: (i) The stability, reliability...

  2. Test and Evaluation Master Plan (TEMP) for the Navy Occupational Health Information Management System (NOHIMS). Appendix A through Appendix U.

    DTIC Science & Technology

    1985-04-24

    reliability/ downtime/ communication lines/ man-machine interface/ other: 2. A noticeable (to the user) failure happens about and that number has been...improving/ steady/ getting.worse. 3. The number of failures /errors for NOHIMS is acceptable/ somewhat acceptable/ somewhat unacceptable/ unacceptable...somewhat fast/ somewhat slow/ slow. 7. When a NWHIMS failure occurs, it affects the day-to-day provision of medical care because work procedures must

  3. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line optionsmore » would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.« less

  4. 34 CFR Appendix A to Subpart N of... - Sample Default Prevention Plan

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false Sample Default Prevention Plan A Appendix A to Subpart N of Part 668 Education Regulations of the Offices of the Department of Education (Continued) OFFICE... Default Rates Appendix A to Subpart N of Part 668—Sample Default Prevention Plan This appendix is provided...

  5. 40 CFR 52.1281 - Original identification of plan section.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... prior to July 1, 1997. (b) The plan was officially submitted on February 4, 1972. (c) The plan revisions..., Appendix C; addition of testing methods, section 8, Appendix C; addition of Permit System, Appendix G and deletion of SO2 regulation, section 4, Appendix C submitted on May 4, 1972, by the Mississippi Air and...

  6. 40 CFR 52.1281 - Original identification of plan section.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... prior to July 1, 1997. (b) The plan was officially submitted on February 4, 1972. (c) The plan revisions..., Appendix C; addition of testing methods, section 8, Appendix C; addition of Permit System, Appendix G and deletion of SO2 regulation, section 4, Appendix C submitted on May 4, 1972, by the Mississippi Air and...

  7. 40 CFR 52.1281 - Original identification of plan section.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... prior to July 1, 1997. (b) The plan was officially submitted on February 4, 1972. (c) The plan revisions..., Appendix C; addition of testing methods, section 8, Appendix C; addition of Permit System, Appendix G and deletion of SO2 regulation, section 4, Appendix C submitted on May 4, 1972, by the Mississippi Air and...

  8. 29 CFR Appendix A to Subpart P of... - Model Fire Safety Plan (Non-Mandatory)

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 7 2013-07-01 2013-07-01 false Model Fire Safety Plan (Non-Mandatory) A Appendix A to...—Model Fire Safety Plan (Non-Mandatory) Model Fire Safety Plan Note: This appendix is non-mandatory and provides guidance to assist employers in establishing a Fire Safety Plan as required in § 1915.502. Table...

  9. 29 CFR Appendix A to Subpart P to... - Model Fire Safety Plan (Non-Mandatory)

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 7 2012-07-01 2012-07-01 false Model Fire Safety Plan (Non-Mandatory) A Appendix A to...—Model Fire Safety Plan (Non-Mandatory) Model Fire Safety Plan Note: This appendix is non-mandatory and provides guidance to assist employers in establishing a Fire Safety Plan as required in § 1915.502. Table...

  10. 29 CFR Appendix A to Subpart P of... - Model Fire Safety Plan (Non-Mandatory)

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Model Fire Safety Plan (Non-Mandatory) A Appendix A to...—Model Fire Safety Plan (Non-Mandatory) Model Fire Safety Plan Note: This appendix is non-mandatory and provides guidance to assist employers in establishing a Fire Safety Plan as required in § 1915.502. Table...

  11. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Response Plans C Appendix C to Part 155 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND.... 155, App. C Appendix C to Part 155—Training Elements for Oil Spill Response Plans 1. General 1.1The....3The material in this appendix C is not all-inclusive and is provided for guidance only. 2. Elements To...

  12. 49 CFR Appendix E to Part 238 - General Principles of Reliability-Based Maintenance Programs

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false General Principles of Reliability-Based... STANDARDS Pt. 238, App. E Appendix E to Part 238—General Principles of Reliability-Based Maintenance... maintenance programs are based on the following general principles. A failure is an unsatisfactory condition...

  13. 33 CFR Appendix D to Part 154 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Response Plans D Appendix D to Part 154 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Pt. 154, App. D Appendix D to Part 154—Training Elements for Oil Spill Response Plans 1. General 1.1The portion of the plan...

  14. 40 CFR Appendix A to Subpart E of... - Plans for Selective Enforcement Auditing

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Auditing A Appendix A to Subpart E of Part 1068 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Auditing Pt. 1068, Subpt. E, App. A Appendix A to Subpart E of Part 1068—Plans for Selective Enforcement Auditing The following tables describe sampling plans for selective enforcement audits, as described in...

  15. Emergency Plan for the Locks and Dams at St. Anthony Falls Minneapolis, Minnesota

    DTIC Science & Technology

    1987-03-01

    Identification Subplan APPENDIX B Emergency Operations and Repair Subplan APPENDIX C Emergency Notification Subplan APPENDIX D Inundation Map Package...Emergency Operations and Repair Subplan 3) Appendix C , Emergency Notification Subplan 4) Appendix D , Inundation Maps and Hydraulic Data b. AP...which were selected for planning include: a. Structural Damage b. Sabotage c . Extreme Storm d . Excess Seepage e. Failure Due to Scouring A brief dis

  16. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  17. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  18. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  19. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  20. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  1. 41 CFR Appendix B to Part 102 - 37-Elements of a State Plan of Operation

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Plan of Operation B Appendix B to Part 102 Public Contracts and Property Management Federal Property... SURPLUS PERSONAL PROPERTY Pt. 102-37, App. B Appendix B to Part 102-37—Elements of a State Plan of... title of the State official who directly supervises the State agent. (b) Operational authority Include...

  2. 23 CFR Appendix F to Part 1200 - Planning and Administration (P&A) Costs

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Planning and Administration (P&A) Costs F Appendix F to... HIGHWAY SAFETY GRANT PROGRAMS Pt. 1200, App. F Appendix F to Part 1200—Planning and Administration (P&A) Costs (a) Policy. Federal participation in P&A activities shall not exceed 50 percent of the total cost...

  3. 23 CFR Appendix F to Part 1200 - PLANNING AND ADMINISTRATION (P&A) COSTS

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false PLANNING AND ADMINISTRATION (P&A) COSTS F APPENDIX F TO... HIGHWAY SAFETY GRANT PROGRAMS Pt. 1200, App. F APPENDIX F TO PART 1200—PLANNING AND ADMINISTRATION (P&A) COSTS (a) Policy. Federal participation in P&A activities shall not exceed 50 percent of the total cost...

  4. A Strategy for DoD Manufacturing Science and Technology R and D in Precision Fabrication

    DTIC Science & Technology

    1994-01-01

    3-11 vii Contents (Continued) Bibliography Appendix A. Progress Since the 1991 Plan Appendix B. Why "Precision" Appendix C...preci- sion fabrication R&D. Appendix A summarizes progress in precision fabrication R&D since the previous plan was prepared in 1991. Appendix B...lathe’s power consumption may indicate worn bearings. Detecting and acting on this condition can prevent costly spindle damage and associated machine down

  5. 40 CFR 52.2470 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...; Washington Administrative Code Chapter 173-430 (Burning of Field and Forage and Turf Grasses Grown for Seed...; Appendix G, Outline of Puget Sound Tropospheric Ozone Research Plan; and Appendix H, Prospective Vehicle... Households; Appendix H, Portland/Vancouver Carbon Monoxide Nonattainment Area Separation Documentation...

  6. 40 CFR Appendix X to Part 86 - Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks X Appendix X to Part 86 Protection of... AND IN-USE HIGHWAY VEHICLES AND ENGINES Pt. 86, App. X Appendix X to Part 86—Sampling Plans for...

  7. Appendix E - Sample Production Facility Plan

    EPA Pesticide Factsheets

    This sample Spill Prevention, Control and Countermeasure (SPCC) Plan in Appendix E is intended to provide examples and illustrations of how a production facility could address a variety of scenarios in its SPCC Plan.

  8. Appendix F - Sample Contingency Plan

    EPA Pesticide Factsheets

    This sample Contingency Plan in Appendix F is intended to provide examples of contingency planning as a reference when a facility determines that the required secondary containment is impracticable, pursuant to 40 CFR §112.7(d).

  9. Appendix D - Sample Bulk Storage Facility Plan

    EPA Pesticide Factsheets

    This sample Spill Prevention, Control and Countermeasure (SPCC) Plan in Appendix D is intended to provide examples and illustrations of how a bulk storage facility could address a variety of scenarios in its SPCC Plan.

  10. NAC Aftermarket Brake Components Project (Secondary Items)

    DTIC Science & Technology

    2007-02-06

    2. Appendix B. Test Plans and Sample Assignments for Disc Brake Pads and (Foundation) Drum Brake Shoes. 3. Appendix C. Test Plans and Sample...Assignments for Disc Brake Rotors and Drum Brake Drums . 4. Appendix D. Off-vehicle Inertia Dynamometer Test Procedures. 5. Appendix E. “Crack & Fatigue...apples” comparison testing processes, and require project outputs documents to be proofed by actual independent testing; HMMWV-ECV ( disc ) and HEMTT

  11. Specific application for Oak Ridge National Laboratory dismantlement of Building 3004. Appendix A -- Quality assurance plan; Appendix B -- Records management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This quality assurance (QA) plan defines the QA requirements for the dismantlement and removal of Building 3004 at Oak Ridge National Laboratory (ORNL). The building is a four-story wooden trained structure with wooden siding, which resides approximately 150 ft west of the Bulk Shielding Reactor, and only several feet away from the visitors entrance to the Graphite Reactor museum. Complete descriptions and sketches are in the Performance Specification document for this project. This project is being conducted as a non-CERCLA maintenance action. This plan is an appendix to the QA plan for the ORNL Environmental Restoration (ER) Program. ORNL/ER-225, whichmore » is the source of the project QA requirements, tailors those QA requirements to the specific needs of this project as defined in ORNL/ER-225. Project-specific description and organization are also provided in this plan. Appendix B, Records Management Plan, is included.« less

  12. 10 CFR Appendix B to Subpart K of... - Sampling Plan for Enforcement Testing

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Sampling Plan for Enforcement Testing B Appendix B to Subpart K of Part 431 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL EQUIPMENT Distribution Transformers Pt. 431, Subpt. K, App. B Appendix B...

  13. 10 CFR Appendix B to Subpart K of... - Sampling Plan for Enforcement Testing

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Sampling Plan for Enforcement Testing B Appendix B to Subpart K of Part 431 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL EQUIPMENT Distribution Transformers Pt. 431, Subpt. K, App. B Appendix B...

  14. 40 CFR Appendix A to Part 355 - The List of Extremely Hazardous Substances and Their Threshold Planning Quantities

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Substances and Their Threshold Planning Quantities A Appendix A to Part 355 Protection of Environment... Substances and Their Threshold Planning Quantities [Alphabetical Order] CAS No. Chemical name Notes Reportable quantity *(pounds) Threshold planning quantity(pounds) 75-86-5 Acetone Cyanohydrin 10 1,000 1752...

  15. 40 CFR Appendix D to Part 112 - Determination of a Worst Case Discharge Planning Volume

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Determination of a Worst Case Discharge Planning Volume D Appendix D to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. D Appendix D to Part 112—Determination of a...

  16. 40 CFR Appendix D to Part 112 - Determination of a Worst Case Discharge Planning Volume

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Determination of a Worst Case Discharge Planning Volume D Appendix D to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. D Appendix D to Part 112—Determination of a...

  17. 40 CFR Appendix D to Part 112 - Determination of a Worst Case Discharge Planning Volume

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Determination of a Worst Case Discharge Planning Volume D Appendix D to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. D Appendix D to Part 112—Determination of a...

  18. 40 CFR Appendix D to Part 112 - Determination of a Worst Case Discharge Planning Volume

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Determination of a Worst Case Discharge Planning Volume D Appendix D to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. D Appendix D to Part 112—Determination of a...

  19. 40 CFR Appendix D to Part 112 - Determination of a Worst Case Discharge Planning Volume

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Determination of a Worst Case Discharge Planning Volume D Appendix D to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. D Appendix D to Part 112—Determination of a...

  20. 40 CFR Appendix B to Subpart I of... - Allowance for Facilities Planning and Design

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Design B Appendix B to Subpart I of Part 35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Pt. 35, Subpt. I, App. B Appendix B to Subpart I of Part 35—Allowance for Facilities Planning and... initial award amount of all prime subagreements for building the project. b. The initial amounts approved...

  1. 40 CFR Appendix B to Subpart I of... - Allowance for Facilities Planning and Design

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Design B Appendix B to Subpart I of Part 35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Pt. 35, Subpt. I, App. B Appendix B to Subpart I of Part 35—Allowance for Facilities Planning and... initial award amount of all prime subagreements for building the project. b. The initial amounts approved...

  2. 40 CFR Appendix A to Part 300 - The Hazard Ranking System

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 28 2014-07-01 2014-07-01 false The Hazard Ranking System A Appendix A to Part 300 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN Pt. 300, App. A Appendix A to Par...

  3. 40 CFR Appendix A to Part 300 - The Hazard Ranking System

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 29 2013-07-01 2013-07-01 false The Hazard Ranking System A Appendix A to Part 300 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN Pt. 300, App. A Appendix A to Par...

  4. 29 CFR Appendix D to Part 4044 - Tables Used To Determine Expected Retirement Age

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Tables Used To Determine Expected Retirement Age D Appendix D to Part 4044 Labor Regulations Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION PLAN TERMINATIONS ALLOCATION OF ASSETS IN SINGLE-EMPLOYER PLANS Pt. 4044, App. D Appendix D to Part...

  5. Interim reliability-evaluation program: analysis of the Browns Ferry, Unit 1, nuclear plant. Appendix C - sequence quantification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mays, S.E.; Poloski, J.P.; Sullivan, W.H.

    1982-07-01

    This report describes a risk study of the Browns Ferry, Unit 1, nuclear plant. The study is one of four such studies sponsored by the NRC Office of Research, Division of Risk Assessment, as part of its Interim Reliability Evaluation Program (IREP), Phase II. This report is contained in four volumes: a main report and three appendixes. Appendix C generally describes the methods used to estimate accident sequence frequency values. Information is presented concerning the approach, example collection, failure data, candidate dominant sequences, uncertainty analysis, and sensitivity analysis.

  6. 40 CFR Appendix B to Part 355 - The List of Extremely Hazardous Substances and Their Threshold Planning Quantities

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Substances and Their Threshold Planning Quantities B Appendix B to Part 355 Protection of Environment... Substances and Their Threshold Planning Quantities [CAS Number Order] CAS No. Chemical name Notes Reportable quantity *(pounds) Threshold planning quantity(pounds) 0 Organorhodium Complex (PMN-82-147) 10 10/10,000 50...

  7. 40 CFR Appendix A to Subpart G of... - Sampling Plans for Selective Enforcement Auditing of Marine Engines

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Enforcement Auditing of Marine Engines A Appendix A to Subpart G of Part 91 Protection of Environment...-IGNITION ENGINES Selective Enforcement Auditing Regulations Pt. 91, Subpt. G, App. A Appendix A to Subpart G of Part 91—Sampling Plans for Selective Enforcement Auditing of Marine Engines Table 1—Sampling...

  8. 23 CFR Appendix G to Subpart A of... - Special Reporting Requirements for “Hometown” or “Imposed” Plan Areas

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Special Reporting Requirements for âHometownâ or âImposedâ Plan Areas G Appendix G to Subpart A of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION... Federal-Aid Construction Contracts (Including Supportive Services) Pt. 230, Subpt. A, App. G Appendix G to...

  9. 23 CFR Appendix G to Subpart A of... - Special Reporting Requirements for “Hometown” or “Imposed” Plan Areas

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Special Reporting Requirements for âHometownâ or âImposedâ Plan Areas G Appendix G to Subpart A of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION... Federal-Aid Construction Contracts (Including Supportive Services) Pt. 230, Subpt. A, App. G Appendix G to...

  10. 23 CFR Appendix G to Subpart A of... - Special Reporting Requirements for “Hometown” or “Imposed” Plan Areas

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Special Reporting Requirements for âHometownâ or âImposedâ Plan Areas G Appendix G to Subpart A of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION... Federal-Aid Construction Contracts (Including Supportive Services) Pt. 230, Subpt. A, App. G Appendix G to...

  11. 23 CFR Appendix G to Subpart A of... - Special Reporting Requirements for “Hometown” or “Imposed” Plan Areas

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Special Reporting Requirements for âHometownâ or âImposedâ Plan Areas G Appendix G to Subpart A of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION... Federal-Aid Construction Contracts (Including Supportive Services) Pt. 230, Subpt. A, App. G Appendix G to...

  12. 23 CFR Appendix G to Subpart A of... - Special Reporting Requirements for “Hometown” or “Imposed” Plan Areas

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Special Reporting Requirements for âHometownâ or âImposedâ Plan Areas G Appendix G to Subpart A of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION... Federal-Aid Construction Contracts (Including Supportive Services) Pt. 230, Subpt. A, App. G Appendix G to...

  13. 40 CFR Appendix B to Subpart I of... - Allowance for Facilities Planning and Design

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Allowance for Facilities Planning and Design B Appendix B to Subpart I of Part 35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works Pt. 35, Subpt. I, App. B Appendix B to...

  14. 40 CFR Appendix A to Subpart F of... - Sampling Plans for Selective Enforcement Auditing of Nonroad Engines

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Enforcement Auditing of Nonroad Engines A Appendix A to Subpart F of Part 89 Protection of Environment... NONROAD COMPRESSION-IGNITION ENGINES Selective Enforcement Auditing Pt. 89, Subpt. F, App. A Appendix A to Subpart F of Part 89—Sampling Plans for Selective Enforcement Auditing of Nonroad Engines Table 1—Sampling...

  15. 40 CFR Appendix A to Subpart G of... - Sampling Plans for Selective Enforcement Auditing of Marine Engines

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Enforcement Auditing of Marine Engines A Appendix A to Subpart G of Part 91 Protection of Environment...-IGNITION ENGINES Selective Enforcement Auditing Regulations Pt. 91, Subpt. G, App. A Appendix A to Subpart G of Part 91—Sampling Plans for Selective Enforcement Auditing of Marine Engines Table 1—Sampling...

  16. 40 CFR Appendix A to Subpart F of... - Sampling Plans for Selective Enforcement Auditing of Small Nonroad Engines

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Enforcement Auditing of Small Nonroad Engines A Appendix A to Subpart F of Part 90 Protection of Environment...-IGNITION ENGINES AT OR BELOW 19 KILOWATTS Selective Enforcement Auditing Pt. 90, Subpt. F, App. A Appendix A to Subpart F of Part 90—Sampling Plans for Selective Enforcement Auditing of Small Nonroad Engines...

  17. 40 CFR Appendix B to Part 355 - The List of Extremely Hazardous Substances and Their Threshold Planning Quantities

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 29 2012-07-01 2012-07-01 false The List of Extremely Hazardous Substances and Their Threshold Planning Quantities B Appendix B to Part 355 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS EMERGENCY PLANNING AND NOTIFICATION Pt....

  18. 40 CFR Appendix A to Part 355 - The List of Extremely Hazardous Substances and Their Threshold Planning Quantities

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 28 2014-07-01 2014-07-01 false The List of Extremely Hazardous Substances and Their Threshold Planning Quantities A Appendix A to Part 355 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS EMERGENCY PLANNING AND NOTIFICATION Pt....

  19. 40 CFR Appendix A to Part 355 - The List of Extremely Hazardous Substances and Their Threshold Planning Quantities

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 29 2012-07-01 2012-07-01 false The List of Extremely Hazardous Substances and Their Threshold Planning Quantities A Appendix A to Part 355 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS EMERGENCY PLANNING AND NOTIFICATION Pt....

  20. 40 CFR Appendix B to Part 355 - The List of Extremely Hazardous Substances and Their Threshold Planning Quantities

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 28 2014-07-01 2014-07-01 false The List of Extremely Hazardous Substances and Their Threshold Planning Quantities B Appendix B to Part 355 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS EMERGENCY PLANNING AND NOTIFICATION Pt....

  1. 2 CFR Appendix V to Part 200 - State/Local Government and Indian Tribe-Wide Central Service Cost Allocation Plans

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 2 Grants and Agreements 1 2014-01-01 2014-01-01 false State/Local Government and Indian Tribe-Wide Central Service Cost Allocation Plans V Appendix V to Part 200 Grants and Agreements Office of Management..., App. V Appendix V to Part 200—State/Local Government and Indian Tribe-Wide Central Service Cost...

  2. 40 CFR Appendix X to Part 86 - Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 20 2012-07-01 2012-07-01 false Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks X Appendix X to Part 86 Protection of... AND IN-USE HIGHWAY VEHICLES AND ENGINES (CONTINUED) Pt. 86, App. X Appendix X to Part 86—Sampling...

  3. 40 CFR Appendix X to Part 86 - Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks X Appendix X to Part 86 Protection of... AND IN-USE HIGHWAY VEHICLES AND ENGINES (CONTINUED) Pt. 86, App. X Appendix X to Part 86—Sampling...

  4. 40 CFR Appendix X to Part 86 - Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 19 2011-07-01 2011-07-01 false Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks X Appendix X to Part 86 Protection of... AND IN-USE HIGHWAY VEHICLES AND ENGINES (CONTINUED) Pt. 86, App. X Appendix X to Part 86—Sampling...

  5. 40 CFR Appendix X to Part 86 - Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 20 2013-07-01 2013-07-01 false Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks X Appendix X to Part 86 Protection of... AND IN-USE HIGHWAY VEHICLES AND ENGINES (CONTINUED) Pt. 86, App. X Appendix X to Part 86—Sampling...

  6. Design and Operation of Power Systems with Large Amounts of Wind Power: Final Summary Report, IEA WIND Task 25, Phase Three 2012-2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holttinen, Hannele; Kiviluoma, Juha; Forcione, Alain

    2016-06-01

    This report summarizes recent findings on wind integration from the 16 countries participating in the International Energy Agency (IEA) Wind collaboration research Task 25 in 2012-2014. Both real experience and studies are reported. The national case studies address several impacts of wind power on electric power systems. In this report, they are grouped under long-term planning issues and short-term operational impacts. Long-term planning issues include grid planning and capacity adequacy. Short-term operational impacts include reliability, stability, reserves, and maximizing the value in operational timescales (balancing related issues). The first section presents variability and uncertainty of power system-wide wind power, andmore » the last section presents recent wind integration studies for higher shares of wind power. Appendix 1 provides a summary of ongoing research in the national projects contributing to Task 25 in 2015-2017.« less

  7. 49 CFR Appendix A to Part 272 - Schedule of Civil Penalties 1

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CRITICAL INCIDENT STRESS PLANS Pt. 272, App. A Appendix A to Part... incident stress plan: (a) Failure to inform about relief options 5,000 6,000 (b) Failure to offer timely... critical incident stress plan for approval by the Federal Railroad Administration. (a) Failure to submit a...

  8. 47 CFR Appendix A to Part 1 - A Plan of Cooperative Procedure in Matters and Cases Under the Provisions of Section 410 of the...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false A Plan of Cooperative Procedure in Matters and Cases Under the Provisions of Section 410 of the Communications Act of 1934 A Appendix A to Part 1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE Pt. 1, App. A Appendix A to Part...

  9. 40 CFR Appendix Xi to Part 86 - Sampling Plans for Selective Enforcement Auditing of Light-Duty Vehicles

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Sampling Plans for Selective Enforcement Auditing of Light-Duty Vehicles XI Appendix XI to Part 86 Protection of Environment ENVIRONMENTAL... Enforcement Auditing of Light-Duty Vehicles 40% AQL Table 1—Sampling Plan Code Letter Annual sales of...

  10. 30 CFR 254.28 - What information must I include in the “In situ burning plan” appendix?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false What information must I include in the âIn situ... information must I include in the “In situ burning plan” appendix? Your in situ burning plan must be... Contingency Plan(s). Your in situ burning plan must include: (a) A description of the in situ burn equipment...

  11. 30 CFR 254.28 - What information must I include in the “In situ burning plan” appendix?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false What information must I include in the âIn situ... information must I include in the “In situ burning plan” appendix? Your in situ burning plan must be... Contingency Plan(s). Your in situ burning plan must include: (a) A description of the in situ burn equipment...

  12. 30 CFR 254.28 - What information must I include in the “In situ burning plan” appendix?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false What information must I include in the âIn situ... information must I include in the “In situ burning plan” appendix? Your in situ burning plan must be... Contingency Plan(s). Your in situ burning plan must include: (a) A description of the in situ burn equipment...

  13. Big River Reservoir Project - Pawcatuck River and Narragansett Bay Drainage Basins - Water and Related Land Resources Study. Volume III. Appendices H-K.

    DTIC Science & Technology

    1981-07-01

    including a recreation impact analysis, aquatic and terrestrial ecosystems assessment and a fish and wildlife management plan), social and cultural...APPENDIX G - DESIGN AND COST ESTIMATES VOLUME III - APPENDIX H - RECREATION AND NATURAL RESOURCES Section 1 - Recreation Impact Analysis Section 2 - Aquatic... Ecosystem Assessment Section 3 - Terrestrial Ecosystem Assessment Section 4 - Fish and Wildlife Management Plan APPENDIX I - SOCIAL AND CULTURAL

  14. 29 CFR Appendix A to Part 4050 - Examples of Designated Benefit Determinations for Missing Participants Under § 4050.5 in Plans...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 9 2011-07-01 2011-07-01 false Examples of Designated Benefit Determinations for Missing... PLAN TERMINATIONS MISSING PARTICIPANTS Pt. 4050, App. A Appendix A to Part 4050—Examples of Designated Benefit Determinations for Missing Participants Under § 4050.5 in Plans With Deemed Distribution Dates on...

  15. 29 CFR Appendix A to Part 4050 - Examples of Designated Benefit Determinations for Missing Participants Under § 4050.5 in Plans...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 9 2014-07-01 2014-07-01 false Examples of Designated Benefit Determinations for Missing... PLAN TERMINATIONS MISSING PARTICIPANTS Pt. 4050, App. A Appendix A to Part 4050—Examples of Designated Benefit Determinations for Missing Participants Under § 4050.5 in Plans With Deemed Distribution Dates on...

  16. 29 CFR Appendix A to Part 4050 - Examples of Designated Benefit Determinations for Missing Participants Under § 4050.5 in Plans...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 9 2012-07-01 2012-07-01 false Examples of Designated Benefit Determinations for Missing... PLAN TERMINATIONS MISSING PARTICIPANTS Pt. 4050, App. A Appendix A to Part 4050—Examples of Designated Benefit Determinations for Missing Participants Under § 4050.5 in Plans With Deemed Distribution Dates on...

  17. 29 CFR Appendix A to Part 4050 - Examples of Designated Benefit Determinations for Missing Participants Under § 4050.5 in Plans...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Examples of Designated Benefit Determinations for Missing... PLAN TERMINATIONS MISSING PARTICIPANTS Pt. 4050, App. A Appendix A to Part 4050—Examples of Designated Benefit Determinations for Missing Participants Under § 4050.5 in Plans With Deemed Distribution Dates on...

  18. 33 CFR Appendix D to Part 154 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Training Elements for Oil Spill... Appendix D to Part 154—Training Elements for Oil Spill Response Plans 1. General 1.1The portion of the plan... contracted oil spill removal organizations and the procedures to notify the activate such organizations. 2.2...

  19. 33 CFR Appendix D to Part 154 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Training Elements for Oil Spill... Appendix D to Part 154—Training Elements for Oil Spill Response Plans 1. General 1.1The portion of the plan... contracted oil spill removal organizations and the procedures to notify the activate such organizations. 2.2...

  20. 33 CFR Appendix D to Part 154 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Training Elements for Oil Spill... Appendix D to Part 154—Training Elements for Oil Spill Response Plans 1. General 1.1The portion of the plan... contracted oil spill removal organizations and the procedures to notify the activate such organizations. 2.2...

  1. 33 CFR Appendix D to Part 154 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Training Elements for Oil Spill... Appendix D to Part 154—Training Elements for Oil Spill Response Plans 1. General 1.1The portion of the plan... contracted oil spill removal organizations and the procedures to notify the activate such organizations. 2.2...

  2. Interim reliability-evaluation program: analysis of the Browns Ferry, Unit 1, nuclear plant. Appendix B - system descriptions and fault trees

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mays, S.E.; Poloski, J.P.; Sullivan, W.H.

    1982-07-01

    This report describes a risk study of the Browns Ferry, Unit 1, nuclear plant. The study is one of four such studies sponsored by the NRC Office of Research, Division of Risk Assessment, as part of its Interim Reliability Evaluation Program (IREP), Phase II. This report is contained in four volumes: a main report and three appendixes. Appendix B provides a description of Browns Ferry, Unit 1, plant systems and the failure evaluation of those systems as they apply to accidents at Browns Ferry. Information is presented concerning front-line system fault analysis; support system fault analysis; human error models andmore » probabilities; and generic control circuit analyses.« less

  3. Appendix X. ComField Information Management System.

    ERIC Educational Resources Information Center

    Coffin, Robert W.

    This appendix outlines the ComField information management system which is designed to give the project management a comprehensive tool for decisionmaking and to free instructors from tasks of keeping current records of every student's performance, help them plan their time more efficiently for counseling students and planning instruction, and…

  4. 41 CFR Appendix E to Chapter 301 - Suggested Guidance for Conference Planning

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 4 2010-07-01 2010-07-01 false Suggested Guidance for Conference Planning E Appendix E to Chapter 301 Public Contracts and Property Management Federal Travel... important; Square or U-shaped style for discussion/interaction; and Banquet or roundtable for discussion...

  5. 40 CFR Appendix V to Part 51 - Criteria for Determining the Completeness of Plan Submissions

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 2 2013-07-01 2013-07-01 false Criteria for Determining the Completeness of Plan Submissions V Appendix V to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION... be determined in practice. (i) Special economic and technological justifications required by any...

  6. 40 CFR Appendix V to Part 51 - Criteria for Determining the Completeness of Plan Submissions

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 2 2012-07-01 2012-07-01 false Criteria for Determining the Completeness of Plan Submissions V Appendix V to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION... be determined in practice. (i) Special economic and technological justifications required by any...

  7. 40 CFR Appendix V to Part 51 - Criteria for Determining the Completeness of Plan Submissions

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 2 2011-07-01 2011-07-01 false Criteria for Determining the Completeness of Plan Submissions V Appendix V to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION... be determined in practice. (i) Special economic and technological justifications required by any...

  8. 40 CFR Appendix V to Part 51 - Criteria for Determining the Completeness of Plan Submissions

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 2 2014-07-01 2014-07-01 false Criteria for Determining the Completeness of Plan Submissions V Appendix V to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION... be determined in practice. (i) Special economic and technological justifications required by any...

  9. 29 CFR Appendix A to Part 4050 - Examples of Designated Benefit Determinations for Missing Participants Under § 4050.5 in Plans...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the deemed distribution date, and has a normal retirement benefit of $1,000 per month payable at age... Participants Under § 4050.5 in Plans With Deemed Distribution Dates on and After August 17, 1998 A Appendix A... Benefit Determinations for Missing Participants Under § 4050.5 in Plans With Deemed Distribution Dates on...

  10. 40 CFR Appendix A to Subpart IIIi... - States With Approved State Implementation Plan Revisions Concerning CAIR NOX Ozone Season Opt-in...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Implementation Plan Revisions Concerning CAIR NOX Ozone Season Opt-in Units A Appendix A to Subpart IIII of Part...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR NOX Ozone Season Opt-in... Implementation Plan Revisions Concerning CAIR NOX Ozone Season Opt-in Units 1. The following States have State...

  11. 40 CFR Appendix A to Subpart IIIi... - States With Approved State Implementation Plan Revisions Concerning CAIR NOX Ozone Season Opt-in...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plan Revisions Concerning CAIR NOX Ozone Season Opt-in Units A Appendix A to Subpart IIII of Part...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR NOX Ozone Season Opt-in... Implementation Plan Revisions Concerning CAIR NOX Ozone Season Opt-in Units 1. The following States have State...

  12. 40 CFR Appendix A to Subpart IIIi... - States With Approved State Implementation Plan Revisions Concerning CAIR NOX Ozone Season Opt-in...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plan Revisions Concerning CAIR NOX Ozone Season Opt-in Units A Appendix A to Subpart IIII of Part...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR NOX Ozone Season Opt-in... Implementation Plan Revisions Concerning CAIR NOX Ozone Season Opt-in Units 1. The following States have State...

  13. 40 CFR Appendix A to Subpart IIIi... - States With Approved State Implementation Plan Revisions Concerning CAIR NOX Ozone Season Opt-in...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plan Revisions Concerning CAIR NOX Ozone Season Opt-in Units A Appendix A to Subpart IIII of Part...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR NOX Ozone Season Opt-in... Implementation Plan Revisions Concerning CAIR NOX Ozone Season Opt-in Units 1. The following States have State...

  14. 40 CFR Appendix A to Subpart IIIi... - States With Approved State Implementation Plan Revisions Concerning CAIR NOX Ozone Season Opt-in...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Implementation Plan Revisions Concerning CAIR NOX Ozone Season Opt-in Units A Appendix A to Subpart IIII of Part...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR NOX Ozone Season Opt-in... Implementation Plan Revisions Concerning CAIR NOX Ozone Season Opt-in Units 1. The following States have State...

  15. 30 CFR 254.28 - What information must I include in the “In situ burning plan” appendix?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false What information must I include in the âIn situ... § 254.28 What information must I include in the “In situ burning plan” appendix? Your in situ burning... appropriate Area Contingency Plan(s). Your in situ burning plan must include: (a) A description of the in situ...

  16. 10 CFR Appendix C to Subpart C of... - Sampling Plan for Enforcement Testing of Distribution Transformers

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Sampling Plan for Enforcement Testing of Distribution Transformers C Appendix C to Subpart C of Part 429 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION... Testing of Distribution Transformers (a) When testing distribution transformers, the number of units in...

  17. 10 CFR Appendix C to Subpart C of... - Sampling Plan for Enforcement Testing of Distribution Transformers

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Sampling Plan for Enforcement Testing of Distribution Transformers C Appendix C to Subpart C of Part 429 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION... Testing of Distribution Transformers (a) When testing distribution transformers, the number of units in...

  18. 10 CFR Appendix C to Subpart C of... - Sampling Plan for Enforcement Testing of Distribution Transformers

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Sampling Plan for Enforcement Testing of Distribution Transformers C Appendix C to Subpart C of Part 429 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION... Testing of Distribution Transformers (a) When testing distribution transformers, the number of units in...

  19. 14 CFR Appendix E to Part 420 - Tables for Explosive Site Plan

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Tables for Explosive Site Plan E Appendix E to Part 420 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION...*(ln(d))3] Table E-8—Separation Distance Criteria for Storage of Liquid Hydrogen and Bulk Quantities of...

  20. 14 CFR Appendix E to Part 420 - Tables for Explosive Site Plan

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Tables for Explosive Site Plan E Appendix E to Part 420 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION...*(ln(d))3] Table E-8—Separation Distance Criteria for Storage of Liquid Hydrogen and Bulk Quantities of...

  1. 10 CFR Appendix C to Part 73 - Nuclear Power Plant Safeguards Contingency Plans

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Nuclear Power Plant Safeguards Contingency Plans C Appendix C to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND... sabotage relating to special nuclear material or nuclear facilities licensed under the Atomic Energy Act of...

  2. 14 CFR Appendix B to Part 150 - Noise Compatibility Programs

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...

  3. 14 CFR Appendix B to Part 150 - Noise Compatibility Programs

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...

  4. 14 CFR Appendix B to Part 150 - Noise Compatibility Programs

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...

  5. 14 CFR Appendix B to Part 150 - Noise Compatibility Programs

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...

  6. 14 CFR Appendix B to Part 150 - Noise Compatibility Programs

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...

  7. 10 CFR Appendix C to Part 73 - Nuclear Power Plant Safeguards Contingency Plans

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Nuclear Power Plant Safeguards Contingency Plans C Appendix C to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND... sabotage relating to special nuclear material or nuclear facilities licensed under the Atomic Energy Act of...

  8. Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report Kennedy Space Center, Florida

    NASA Technical Reports Server (NTRS)

    Johnson, Jill W. (Compiler)

    2015-01-01

    This Corrective Measures Implementation (CMI) Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site. Applicable meeting minutes are provided as Appendix A. The following EE ADPs for CRHE are included with this CMI Progress Report: center dot Supplemental Site Characterization ADP (Step 1 EE) (Appendix B) center dot Site Characterization ADP (Step 1 EE) for Hot Spot 1 (HS1) (Appendix C) center dot Remedial Alternatives Evaluation (Step 2 EE) ADP for HS1 (Appendix D) center dot Interim Measures Work Plan (Step 3 EE) ADP for HS1 (Appendix E) center dot Site Characterization ADP (Step 1 EE) ADP for Hot Spot 2 (HS2), High Concentration Plume (HCP), and Low Concentration Plume (LCP) (Appendix F) A summary of direct-push technology (DPT) and groundwater monitoring well sampling results are provided in Appendices G and H, respectively. The Interim Land Use Control Implementation Plan (LUCIP) is provided as Appendix I. Monitoring well completion reports, other applicable field forms, survey data, and analytical laboratory reports are provided as Appendices J through M, respectively, in the electronic copy of this document. Selected Site photographs are provided in Appendix N. The interim groundwater monitoring plan and document revision log are included as Appendices O and P, respectively. KSC Electronic Data Deliverable (KEDD) files are provided on the attached compact disk.

  9. Developing a Campaign Plan to Target Centers of Gravity Within Economic Systems

    DTIC Science & Technology

    1995-05-01

    Conclusion 67 CHAPTER 7: CURRENT AND FUTURE CONCERNS 69 Decision Making and Planning 69 Conclusion 72 CHAPTER 8: CONCLUSION 73 APPENDIX A: STATISTICS 80...Terminology and Statistical Tests 80 Country Analysis 84 APPENDIX B 154 BIBLIOGRAPHY 157 VITAE 162 IV LIST OF FIGURES Figure 1. Air Campaign...This project furthers the original statistical effort and adds to this a campaign planning approach (including both systems and operational level

  10. 40 CFR Appendix A to Subpart III... - States With Approved State Implementation Plan Revisions Concerning CAIR SO2 Opt-In Units

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Implementation Plan Revisions Concerning CAIR SO2 Opt-In Units A Appendix A to Subpart III of Part 97 Protection... BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR SO2 Opt-in Units Pt. 97, Subpt. III... Concerning CAIR SO2 Opt-In Units 1. The following States have State Implementation Plan revisions under § 51...

  11. 40 CFR Appendixes T-U to Part 51 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 2 2011-07-01 2011-07-01 false [Reserved] T Appendixes T-U to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Appendixes T-U to Part 51 [Reserved] ...

  12. 40 CFR Appendixes T-U to Part 51 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false [Reserved] T Appendixes T-U to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Appendixes T-U to Part 51 [Reserved] ...

  13. 40 CFR Appendixes N-O to Part 51 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 2 2011-07-01 2011-07-01 false [Reserved] N Appendixes N-O to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Appendixes N-O to Part 51 [Reserved] ...

  14. 40 CFR Appendixes A-K to Part 51 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 2 2011-07-01 2011-07-01 false [Reserved] A Appendixes A-K to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Appendixes A-K to Part 51 [Reserved] ...

  15. 40 CFR Appendixes A-K to Part 51 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 2 2014-07-01 2014-07-01 false [Reserved] A Appendixes A-K to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Appendixes A-K to Part 51 [Reserved] ...

  16. 40 CFR Appendixes A-K to Part 51 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 2 2013-07-01 2013-07-01 false [Reserved] A Appendixes A-K to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Appendixes A-K to Part 51 [Reserved] ...

  17. 40 CFR Appendixes A-K to Part 51 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 2 2012-07-01 2012-07-01 false [Reserved] A Appendixes A-K to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Appendixes A-K to Part 51 [Reserved] ...

  18. 40 CFR Appendixes A-K to Part 51 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false [Reserved] A Appendixes A-K to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Appendixes A-K to Part 51 [Reserved] ...

  19. 40 CFR Appendixes Q-R to Part 51 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 2 2013-07-01 2013-07-01 false [Reserved] Q Appendixes Q-R to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Appendixes Q-R to Part 51 [Reserved] ...

  20. 40 CFR Appendixes Q-R to Part 51 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 2 2014-07-01 2014-07-01 false [Reserved] Q Appendixes Q-R to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Appendixes Q-R to Part 51 [Reserved] ...

  1. 40 CFR Appendixes Q-R to Part 51 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false [Reserved] Q Appendixes Q-R to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Appendixes Q-R to Part 51 [Reserved] ...

  2. 40 CFR Appendixes Q-R to Part 51 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 2 2011-07-01 2011-07-01 false [Reserved] Q Appendixes Q-R to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Appendixes Q-R to Part 51 [Reserved] ...

  3. 40 CFR Appendixes Q-R to Part 51 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 2 2012-07-01 2012-07-01 false [Reserved] Q Appendixes Q-R to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Appendixes Q-R to Part 51 [Reserved] ...

  4. 40 CFR Appendixes N-O to Part 51 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false [Reserved] N Appendixes N-O to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Appendixes N-O to Part 51 [Reserved] ...

  5. 10 CFR Appendix A to Part 436... - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false [Reserved] A Appendix A to Part 436-Energy Conservation Standards for General Operations Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Appendix A to Part 436—Energy Conservation Standards for General Operations...

  6. 10 CFR Appendix A to Part 436... - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false [Reserved] A Appendix A to Part 436-Energy Conservation Standards for General Operations Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Appendix A to Part 436—Energy Conservation Standards for General Operations...

  7. 10 CFR Appendix A to Part 436... - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false [Reserved] A Appendix A to Part 436-Energy Conservation Standards for General Operations Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Appendix A to Part 436—Energy Conservation Standards for General Operations...

  8. 10 CFR Appendix A to Part 436... - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false [Reserved] A Appendix A to Part 436-Energy Conservation Standards for General Operations Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Appendix A to Part 436—Energy Conservation Standards for General Operations...

  9. 10 CFR Appendix A to Part 436... - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false [Reserved] A Appendix A to Part 436-Energy Conservation Standards for General Operations Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Appendix A to Part 436—Energy Conservation Standards for General Operations...

  10. Suitability Analysis of Continuous-Use Reliability Growth Projection Models

    DTIC Science & Technology

    2015-03-26

    47 Appendix B. Storyboard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51...0 8 17 4 3 2 5 1 7 3 5 1 7 0 8 18 5 2 3 4 1 7 4 4 1 7 0 8 50 Appendix B. Storyboard 51 Bibliography 1. AMSC. Department of Defense Handbook

  11. Appendixes L-P. Vol. II, A Plan for Managing the Development, Implementation and Operation of a Model Elementary Teacher Education Program.

    ERIC Educational Resources Information Center

    Oregon Coll. of Education, Monmouth.

    Five appendixes make up this part of the final report on the elementary teacher education program. Appendix L is a summary chart of the orientation meetings, giving dates, locations, and participants. Appendix M is a listing of the seven school districts actively participating in the OCE coalition, with a brief description of their essential…

  12. No-migration variance petition. Appendices A--B: Volume 2, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-03-01

    Volume II contains Appendix A, emergency plan and Appendix B, waste analysis plan. The Waste Isolation Pilot Plant (WIPP) Emergency plan and Procedures (WP 12-9, Rev. 5, 1989) provides an organized plan of action for dealing with emergencies at the WIPP. A contingency plan is included which is in compliance with 40 CFR Part 265, Subpart D. The waste analysis plan provides a description of the chemical and physical characteristics of the wastes to be emplaced in the WIPP underground facility. A detailed discussion of the WIPP Waste Acceptance Criteria and the rationale for its established units are also included.

  13. 49 CFR Appendix A to Part 194 - Guidelines for the Preparation of Response Plans

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Oil spill removal organization field equipment deployment drills conducted yearly. (5) A drill that... PLANS FOR ONSHORE OIL PIPELINES Pt. 194, App. A Appendix A to Part 194—Guidelines for the Preparation of... substantial harm to the environment; (4) A list of line sections contained in the response zone, identified by...

  14. 49 CFR Appendix A to Part 194 - Guidelines for the Preparation of Response Plans

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Oil spill removal organization field equipment deployment drills conducted yearly. (5) A drill that... PLANS FOR ONSHORE OIL PIPELINES Pt. 194, App. A Appendix A to Part 194—Guidelines for the Preparation of... substantial harm to the environment; (4) A list of line sections contained in the response zone, identified by...

  15. 49 CFR Appendix A to Part 194 - Guidelines for the Preparation of Response Plans

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Oil spill removal organization field equipment deployment drills conducted yearly. (5) A drill that... PLANS FOR ONSHORE OIL PIPELINES Pt. 194, App. A Appendix A to Part 194—Guidelines for the Preparation of... substantial harm to the environment; (4) A list of line sections contained in the response zone, identified by...

  16. 49 CFR Appendix A to Part 194 - Guidelines for the Preparation of Response Plans

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Oil spill removal organization field equipment deployment drills conducted yearly. (5) A drill that... PLANS FOR ONSHORE OIL PIPELINES Pt. 194, App. A Appendix A to Part 194—Guidelines for the Preparation of... substantial harm to the environment; (4) A list of line sections contained in the response zone, identified by...

  17. 49 CFR Appendix A to Part 194 - Guidelines for the Preparation of Response Plans

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Oil spill removal organization field equipment deployment drills conducted yearly. (5) A drill that... PLANS FOR ONSHORE OIL PIPELINES Pt. 194, App. A Appendix A to Part 194—Guidelines for the Preparation of... substantial harm to the environment; (4) A list of line sections contained in the response zone, identified by...

  18. 49 CFR Appendix B to Part 172 - Trefoil Symbol

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 2 2014-10-01 2014-10-01 false Trefoil Symbol B Appendix B to Part 172 Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS MATERIALS SAFETY... SECURITY PLANS Pt. 172, App. B Appendix B to Part 172—Trefoil Symbol 1. Except as provided in paragraph 2...

  19. 49 CFR Appendix B to Part 172 - Trefoil Symbol

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Trefoil Symbol B Appendix B to Part 172 Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS MATERIALS SAFETY... SECURITY PLANS Pt. 172, App. B Appendix B to Part 172—Trefoil Symbol 1. Except as provided in paragraph 2...

  20. Investigation into avian mortality in the Playa Lakes region of southeastern New Mexico: Final Report - June 1997

    USGS Publications Warehouse

    Dein, F. Joshua; Baeten, Laurie A.; Moore, Melody K.; Samuel, Michael D.; Miller, Paul D.; Murphy, Christopher; Sissler, Steven; Jeske, Clinton W.; Jehl, Joseph R.; Yaeger, J. S.; Bauer, B.; Mahoney, Shiela A.

    1997-01-01

    This Final Report is a review of work on a cooperative study undertaken by the USGS Biological Resources Division's National Wildlife Health Center (NWHC) and National Wetlands Research Center (NWRC; formerly the Southern Science Center) from 1994 through 1997. The study was initiated at the request of the Bureau of Land Management (BLM), through a request to the former National Biological Service. The Southeastern New Mexico Playa Lakes Coordinating Committee (SENMPLCC) played an important role in outlining the research needs. The initial Study Plan document, which outlines the background, objectives and methods for the first two years is available as Appendix 1. A letter indicating modifications to the Study Plan was sent to the SENMPLCC chair on April 25,1995, and is Appendix 2. An Interim Report, covering this work was completed and submitted in September 1995. The Literature Review section of the study was completed and presented to SENMPLCC in August, 1995. Following SENMPLCC review, NWHC was asked to develop a series of questions that could be posed from information gained in the initial phase (Appendix 3). The NWHC and NWRC were then directed to begin work to answer the top three questions, within the available fiscal resources. NWRC could continue with work outlined under the original Study Plan (Appendix 1), however an additional Study Plan for experiments performed by NWHC and collaborators and is available as Appendix 4.

  1. Feasibility study for the Swaziland/Mozambique interconnector. Final report. Export trade information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-11-01

    This study, conducted by Black & Veatch, was funded by the U.S. Trade and Development Agency. The report, produced for the Ministry of National Resources, Energy and Environment (MNRE) of Swaziland, determines the least cost capacity expansion option to meet the future power demand and system reliability criteria of Swaziland, with particular emphasis on the proposed interconnector between Swaziland and Mozambique. Volume 2, the Final Report, contains the following sections: (1.0) Introduction; (2.0) Review of SEB Power System; (3.0) SEB Load Forecast and Review; (4.0) SEB Load Forecast Revision; (5.0) The SEB Need for Power; (6.0) SEB System Development Planmore » Review; (7.0) Southern Mozambique EdM power System Review; (8.0) Southern Mozambique EdM Energy and Demand; (9.0) Supply Side Capacity Options for Swaziland and Mozambique; (10.0) SEB Expansion Plan Development; (11.0) EdM Expansion Plan Development; (12.0) Cost Sharing of the Interconnector; (13.0) Enviroinmental Evaluation of Interconnector Options; (14.0) Generation/Transmission Trade Offs; (15.0) Draft Interconnection Agreement and Contract Packages; (16.0) Transmission System Study; (17.0) Automatic General Control; (18.0) Automatic Startup and Shutdown of Hydro Electric Power Plants; (19.0) Communications and Metering; (20.0) Conclusions and Recommendations; Appendix A: Demand Side Management Primer; Appendix B. PURPA and Avoided Cost Calculations.« less

  2. Transportation Strategic Research Plan.

    DOT National Transportation Integrated Search

    1999-05-01

    Contents: Executive Summary; Introduction; Federal Transportation-Related Research and Development; Areas of Enabling Research; Future Direction and Priorities; Appendix A: Patnership Initiatives; Appendix B: List of Acronyms; and Selected Bibliograp...

  3. 40 CFR 52.2465 - Original identification of plan section.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., 2FSD, and pre-dryer 3FSD from Part IV, Rule EX-4, Section 4.41(i) until December 15, 1981, submitted on...) Appendix K (7) Appendix N (8) Appendix P (9) Appendix R I., II.B., II.D., II.E., II.F., II.G., II.H., II.I...) Amendments to Part I, Subpart 1.01 (Certain Terms Defined) and to Part IV, Section 4.52 (former Section 4.705...

  4. Coastal Surveillance Baseline Model Development

    DTIC Science & Technology

    2015-02-27

    In the current STK model, a set of areas was defined for two reasons: To provide visual assistance during ship and aircraft route planning; and To...RF), electro-optic (EO), infrared (IR), and visual Partially Met The free version of STK can only generate simple generic sensors RQ-04 The model...25 APPENDIX A PLATFORM OBJECT ROUTE PLANNING PROCEDURE ............. A-1 APPENDIX B STK INSTALLATION

  5. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... (CONTINUED) GENERAL Business and Industrial Loan Program Pt. 1980, Subpt. E, App. D Appendix D to Subpart E... designed utilizing accepted engineering practices and are conformed to applicable Federal, State and local... this appendix. (II) Technical Services. (A) The borrower is responsible for selecting engineering...

  6. 49 CFR Appendix C to Part 172 - Dimensional Specifications for Recommended Placard Holder

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 2 2011-10-01 2011-10-01 false Dimensional Specifications for Recommended Placard Holder C Appendix C to Part 172 Transportation Other Regulations Relating to Transportation PIPELINE AND... INFORMATION, TRAINING REQUIREMENTS, AND SECURITY PLANS Pt. 172, App. C Appendix C to Part 172—Dimensional...

  7. 49 CFR Appendix C to Part 172 - Dimensional Specifications for Recommended Placard Holder

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 2 2014-10-01 2014-10-01 false Dimensional Specifications for Recommended Placard Holder C Appendix C to Part 172 Transportation Other Regulations Relating to Transportation PIPELINE AND... INFORMATION, TRAINING REQUIREMENTS, AND SECURITY PLANS Pt. 172, App. C Appendix C to Part 172—Dimensional...

  8. 10 CFR Appendix D to Part 436 - Energy Program Conservation Elements

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Energy Program Conservation Elements D Appendix D to Part 436 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Pt. 436, App. D Appendix D to Part 436—Energy Program Conservation Elements (a) In all successful energy...

  9. 10 CFR Appendix D to Part 436 - Energy Program Conservation Elements

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Energy Program Conservation Elements D Appendix D to Part 436 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Pt. 436, App. D Appendix D to Part 436—Energy Program Conservation Elements (a) In all successful energy...

  10. 10 CFR Appendix D to Part 436 - Energy Program Conservation Elements

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Energy Program Conservation Elements D Appendix D to Part 436 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Pt. 436, App. D Appendix D to Part 436—Energy Program Conservation Elements (a) In all successful energy...

  11. 10 CFR Appendix D to Part 436 - Energy Program Conservation Elements

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Energy Program Conservation Elements D Appendix D to Part 436 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Pt. 436, App. D Appendix D to Part 436—Energy Program Conservation Elements (a) In all successful energy...

  12. 10 CFR Appendix D to Part 436 - Energy Program Conservation Elements

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Energy Program Conservation Elements D Appendix D to Part 436 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Pt. 436, App. D Appendix D to Part 436—Energy Program Conservation Elements (a) In all successful energy...

  13. 14 CFR Appendix D to Part 417 - Flight Termination Systems, Components, Installation, and Monitoring

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... other propulsion system. D417.5Flight termination system design (a) Reliability prediction. A flight... design margin required by this appendix. As an alternative to subjecting the flight termination system to... the component is heated or cooled to achieve the required dwell time at one extreme of the required...

  14. 14 CFR Appendix D to Part 417 - Flight Termination Systems, Components, Installation, and Monitoring

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... other propulsion system. D417.5Flight termination system design (a) Reliability prediction. A flight... design margin required by this appendix. As an alternative to subjecting the flight termination system to... the component is heated or cooled to achieve the required dwell time at one extreme of the required...

  15. 14 CFR Appendix D to Part 417 - Flight Termination Systems, Components, Installation, and Monitoring

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... other propulsion system. D417.5Flight termination system design (a) Reliability prediction. A flight... design margin required by this appendix. As an alternative to subjecting the flight termination system to... the component is heated or cooled to achieve the required dwell time at one extreme of the required...

  16. 14 CFR Appendix D to Part 417 - Flight Termination Systems, Components, Installation, and Monitoring

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... other propulsion system. D417.5Flight termination system design (a) Reliability prediction. A flight... design margin required by this appendix. As an alternative to subjecting the flight termination system to... the component is heated or cooled to achieve the required dwell time at one extreme of the required...

  17. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less

  18. 33 CFR Appendix C to Part 154 - Guidelines for Determining and Evaluating Required Response Resources for Facility Response Plans

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... plan must be designed to operate in the conditions expected in the facility's geographic area. These... handling, storing, or transporting oil in more than one operating environment as indicated in Table 1 of... § 154.106), or other tests approved by the Coast Guard. 2.4Table 1 of this appendix lists criteria for...

  19. 33 CFR Appendix C to Part 154 - Guidelines for Determining and Evaluating Required Response Resources for Facility Response Plans

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... plan must be designed to operate in the conditions expected in the facility's geographic area. These... handling, storing, or transporting oil in more than one operating environment as indicated in Table 1 of... § 154.106), or other tests approved by the Coast Guard. 2.4Table 1 of this appendix lists criteria for...

  20. 30 CFR 254.28 - What information must I include in the “In situ burning plan” appendix?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What information must I include in the âIn situ... include in the “In situ burning plan” appendix? Your in situ burning plan must be consistent with any... situ burning plan must include: (a) A description of the in situ burn equipment including its...

  1. 40 CFR Appendix to Subpart M of... - Alphabetical Listing of Tribes and Corresponding Sections

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Corresponding Sections Appendix to Subpart M of Part 49 Protection of Environment ENVIRONMENTAL PROTECTION... Implementation Plans for Tribes-Region X Pt. 49, Subpt. M, App. Appendix to Subpart M of Part 49—Alphabetical Listing of Tribes and Corresponding Sections Indian Tribe Refer to the following sections in subpart M...

  2. 42 CFR Appendix to Subpart B of... - Required Consent Form

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Required Consent Form Appendix to Subpart B of Part 50 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS POLICIES OF GENERAL APPLICABILITY Sterilization of Persons in Federally Assisted Family Planning Projects Pt. 50, Subpt. B, App. Appendix to Subpart B of Part 50...

  3. 42 CFR Appendix to Subpart B of... - Required Consent Form

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Required Consent Form Appendix to Subpart B of Part 50 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS POLICIES OF GENERAL APPLICABILITY Sterilization of Persons in Federally Assisted Family Planning Projects Pt. 50, Subpt. B, App. Appendix to Subpart B of Part 50...

  4. 42 CFR Appendix to Subpart B of... - Required Consent Form

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Required Consent Form Appendix to Subpart B of Part 50 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS POLICIES OF GENERAL APPLICABILITY Sterilization of Persons in Federally Assisted Family Planning Projects Pt. 50, Subpt. B, App. Appendix to Subpart B of Part 50...

  5. 42 CFR Appendix to Subpart B of... - Required Consent Form

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Required Consent Form Appendix to Subpart B of Part 50 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS POLICIES OF GENERAL APPLICABILITY Sterilization of Persons in Federally Assisted Family Planning Projects Pt. 50, Subpt. B, App. Appendix to Subpart B of Part 50...

  6. 42 CFR Appendix to Subpart B of... - Required Consent Form

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Required Consent Form Appendix to Subpart B of Part 50 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS POLICIES OF GENERAL APPLICABILITY Sterilization of Persons in Federally Assisted Family Planning Projects Pt. 50, Subpt. B, App. Appendix to Subpart B of Part 50...

  7. 29 CFR Appendix B to Part 4044 - Interest Rates Used To Value Benefits

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Interest Rates Used To Value Benefits B Appendix B to Part... TERMINATIONS ALLOCATION OF ASSETS IN SINGLE-EMPLOYER PLANS Pt. 4044, App. B Appendix B to Part 4044—Interest Rates Used To Value Benefits [This table sets forth, for each indicated calendar month, the interest...

  8. 40 CFR Appendix W to Part 51 - Guideline on Air Quality Models

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Guideline on Air Quality Models W Appendix W to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Pt. 51, App. W Appendix W to Part 51—Guideline on Air Quality Models...

  9. Computer-Based Instruction within Transportation Mobility Training

    DTIC Science & Technology

    1990-09-01

    APT Lesson Plan .... 191 Appendix C: APT Workbook .... .............. . 209 Appendix D: Experiment Pretest and Posttest ..... .. 222 Appendix E : Test...Questions The following investigative questions are set forth to determine if CBI is an effective alternative to classroom training in the area of...Submotorpool covered too limited an area , focusing mainly on the dispatching and driving of vehicles. The Transportation Resources Control Center/Transportation

  10. 49 CFR Appendix D to Part 172 - Rail Risk Analysis Factors

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 2 2011-10-01 2011-10-01 false Rail Risk Analysis Factors D Appendix D to Part... REQUIREMENTS, AND SECURITY PLANS Pt. 172, App. D Appendix D to Part 172—Rail Risk Analysis Factors A. This... safety and security risk analyses required by § 172.820. The risk analysis to be performed may be...

  11. 49 CFR Appendix D to Part 172 - Rail Risk Analysis Factors

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Rail Risk Analysis Factors D Appendix D to Part... REQUIREMENTS, AND SECURITY PLANS Pt. 172, App. D Appendix D to Part 172—Rail Risk Analysis Factors A. This... safety and security risk analyses required by § 172.820. The risk analysis to be performed may be...

  12. 12 CFR Appendix G to Part 226 - Open-End Model Forms and Clauses

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 3 2014-01-01 2014-01-01 false Open-End Model Forms and Clauses G Appendix G... RESERVE SYSTEM (CONTINUED) TRUTH IN LENDING (REGULATION Z) Pt. 226, App. G Appendix G to Part 226—Open-End... Card Accounts Under an Open-End (Not Home-Secured) Consumer Credit Plan [Interest will be charged to...

  13. 12 CFR Appendix G to Part 226 - Open-End Model Forms and Clauses

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 3 2013-01-01 2013-01-01 false Open-End Model Forms and Clauses G Appendix G... RESERVE SYSTEM (CONTINUED) TRUTH IN LENDING (REGULATION Z) Pt. 226, App. G Appendix G to Part 226—Open-End Model Forms and Clauses G-1Balance Computation Methods Model Clauses (Home-equity Plans) (§§ 226.6 and...

  14. 12 CFR Appendix G to Part 1026 - Open-End Model Forms and Clauses

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 8 2013-01-01 2013-01-01 false Open-End Model Forms and Clauses G Appendix G...) Pt. 1026, App. G Appendix G to Part 1026—Open-End Model Forms and Clauses G-1Balance Computation Methods Model Clauses (Home-equity Plans) (§§ 1026.6 and 1026.7) G-1(A)Balance Computation Methods Model...

  15. 12 CFR Appendix G to Part 1026 - Open-End Model Forms and Clauses

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 8 2012-01-01 2012-01-01 false Open-End Model Forms and Clauses G Appendix G...) Pt. 1026, App. G Appendix G to Part 1026—Open-End Model Forms and Clauses G-1Balance Computation Methods Model Clauses (Home-equity Plans) (§§ 1026.6 and 1026.7) G-1(A)Balance Computation Methods Model...

  16. 12 CFR Appendix G to Part 1026 - Open-End Model Forms and Clauses

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 9 2014-01-01 2014-01-01 false Open-End Model Forms and Clauses G Appendix G...) Pt. 1026, App. G Appendix G to Part 1026—Open-End Model Forms and Clauses G-1Balance Computation Methods Model Clauses (Home-equity Plans) (§§ 1026.6 and 1026.7) G-1(A)Balance Computation Methods Model...

  17. Waste Analysis Plan and Waste Characterization Survey, Barksdale AFB, Louisiana

    DTIC Science & Technology

    1991-03-01

    review to assess if analysis is needed, any analyses that are to be provided by generators, and methods to be used to meet specific waste analysis ...sampling method , sampling frequency, parameters of analysis , SW 846 test methods , Department of Transportation (DOT) shipping name and hazard class...S.e.iceA w/Atchs 2. HQ SAC/DEV Ltr, 28 Sep 90 19 119 APPENDIX B Waste Analysis Plan Rationale 21 APPENDIX B 1. SAMPLING METHOD RATIONALE: Composite Liquid

  18. Gemini Program Mission Planning Report

    NASA Technical Reports Server (NTRS)

    1965-01-01

    This report defines the Gemini Program objectives and presents guidelines for the individual Gemini missions. It provides general space vehicle configuration data, and descriptions of planned missions. Contingency mission requirements and extravehicular operations to be performed during specific missions are described in the last two sections of the basic document. Data on spacecraft weights and Gemini Launch Vehicle performance capabilities are provided in Appendix A, while Appendix B provides descriptions of onboard experiments to be conducted during Gemini missions.

  19. Electrical Subsystems Flight Test Handbook

    DTIC Science & Technology

    1984-01-01

    distribution of this handbook to the public at large, or by DDC to the National Technical Information Service (NTIS). At NTIS, it will be available to...Abnormal Mode 58 Emergency Mode 61 Instrumentation 62 Test Information Sheets 62 Integration with Flight Test Program 62 DATA MEASUREMENT, ANALYS IS...AND EVALUATION 65 REFERENCES 73 -APPENDIX A - EXAMPLE OF TEST INFORMATION SHEET 75 APPENDIX B - EXAMPLE OF TEST PLAN SAFETY REVIEW 85 APPENDIX C

  20. Chesapeake Bay Low Freshwater Inflow Study. Appendix B. Plan Formulation. Appendix C. Hydrology. Appendix D. Hydraulic Model Test.

    DTIC Science & Technology

    1984-09-01

    are: I. Pursue a highly conservative policy toward alterations in the quantity of freshwater inflow, recognizing the high biological value of Chesapeake...particular area. Regional development policies could be implemented to control growth patterns and associated water uses. Or, regulations could...changes in other relevant variables such as technology, consumer behavior, unanticipated shifts in agricultural irrigation policy or demands for water

  1. 12 CFR Appendix G to Part 226 - Open-End Model Forms and Clauses

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 3 2012-01-01 2012-01-01 false Open-End Model Forms and Clauses G Appendix G... RESERVE SYSTEM TRUTH IN LENDING (REGULATION Z) Pt. 226, App. G Appendix G to Part 226—Open-End Model Forms and Clauses G-1Balance Computation Methods Model Clauses (Home-equity Plans) (§§ 226.6 and 226.7) G-1...

  2. The Fall of Crete 1941: Was Freyberg Culpable?

    DTIC Science & Technology

    2006-06-16

    industrial support. Following the battles of Greece and Crete, and the Japanese attack on Pearl Harbour , Fraser faced significant pressure to bring...59 CHAPTER 5. THE BATTLE ...140 APPENDIX C. GERMAN ORDER OF BATTLE (OPERATION MERKUR) .............141 APPENDIX D. OPERATION MERKUR PLAN

  3. Test of acoustic tone source and propulsion performance of C8A Buffalo suppressor nozzle

    NASA Technical Reports Server (NTRS)

    Marrs, C. C.; Harkonen, D. L.; Okeefe, J. V.

    1974-01-01

    Results are presented for a static acoustic and propulsion performance ground test conducted at the Boeing hot nozzle facility on the C8A Buffalo noise suppressor nozzle. Various methods to remove a nozzle-associated 2000-Hz tone are evaluated. Results of testing this rectangular-array lobed nozzle for propulsion performance and acoustic directivity are reported. Recommendations for future nozzle modifications and further testing are included. Appendix A contains the test plan. Appendix B presents the test log. Appendix C contains plots of the one-third octave sound pressure levels recorded during the test. Appendix D describes the acoustic data recording and reduction systems. The performance data is tabulated in Appendix E.

  4. 49 CFR Appendix E to Part 40 - SAP Equivalency Requirements for Certification Organizations

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... Testing Validity: The certification examination must be reviewed by an independent authority for validity (examination reliability and relationship to the knowledge, skills, and abilities required by the counseling field). The reliability of the exam is paramount if counselor attributes are to be accurately measured...

  5. INDOT Technical Training Plan : Appendix B

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  6. INDOT Technical Training Plan : Appendix M

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  7. INDOT Technical Training Plan : Appendix P

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  8. INDOT Technical Training Plan : Appendix F

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  9. INDOT Technical Training Plan : Appendix H

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  10. INDOT Technical Training Plan : Appendix E

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  11. INDOT Technical Training Plan : Appendix O

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  12. INDOT Technical Training Plan : Appendix J

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  13. INDOT Technical Training Plan : Appendix L

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  14. INDOT Technical Training Plan : Appendix A

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  15. INDOT Technical Training Plan : Appendix D

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  16. INDOT Technical Training Plan : Appendix K

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  17. INDOT Technical Training Plan : Appendix G

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  18. INDOT Technical Training Plan : Appendix I

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  19. INDOT Technical Training Plan : Appendix N

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  20. INDOT Technical Training Plan : Appendix C

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  1. Methods for Integrating Environmental Awareness Training into Army Programs of Instruction

    DTIC Science & Technology

    1993-06-01

    generations. iv NTIS CRA&I ) F -IC TAB U.a’mot’::ed El By .. . ... ....... By .......................... ...... . .. DiO t, ib., tion I CONTENTS...Training Support Package ................... E-1-E-19 Appendix F . Sample of Officer Basic Course Instructor’s Lesson Plan with Embedded Information... F -1- F -7 Appendix G. Samples of Situational Training Exercises ........... G-1-G 9 Appendix H. Samples of Pre-Command Course Guest Speaker

  2. Army Groundwater Modeling Use and Needs Workshop

    DTIC Science & Technology

    1993-06-01

    MA 7th and C Street Coomerce City, CO 80022 (303) 289-0419 ES Appendx E List of A.hue Publ, reportingWoo b f orl0 This co0 rtionl of ,Miflrmat,0...Appendix C: Survey Form ................................. CI Appendix D: Panel Objectives, Members, and Topics .............. DI Appendix E : List of...contributed to the planning and organization of the workshop: Mr. Tony Dardeau, Ms. Cheryl Lloyd, Dr. Paul R. Schroeder, Mr. Mark E . Zappi, Mr

  3. 40 CFR Appendix F to Part 112 - Facility-Specific Response Plan

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of Contents 1.0Model Facility-Specific Response Plan 1.1Emergency Response Action Plan 1.2Facility.... EC01MR92.015 1.1Emergency Response Action Plan Several sections of the response plan shall be co-located... sections shall be called the Emergency Response Action Plan. The Agency intends that the Action Plan...

  4. 40 CFR Appendix F to Part 112 - Facility-Specific Response Plan

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Guidelines (see Appendix E to this part, section 13, for availability), which satisfy Oil Pollution Act (OPA... contracts with response contractors shall be included in this section so that the availability of resources...: ___ Direction from City: ___ Section: ____ Township: ____ Range: ____ Borough: ____ Container Type: ___ Tank Oil...

  5. 29 CFR Appendix A to Subpart R of... - Guidelines for Establishing the Components of a Site-specific Erection Plan: Non-mandatory...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... R of Part 1926 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH.... 1926, Subpt. R, App. A Appendix A to Subpart R of Part 1926—Guidelines for Establishing the Components...

  6. 29 CFR Appendix A to Subpart R of... - Guidelines for Establishing the Components of a Site-specific Erection Plan: Non-mandatory...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... R of Part 1926 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH.... 1926, Subpt. R, App. A Appendix A to Subpart R of Part 1926—Guidelines for Establishing the Components...

  7. 29 CFR Appendix A to Subpart R of... - Guidelines for Establishing the Components of a Site-specific Erection Plan: Non-mandatory...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... R of Part 1926 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH.... 1926, Subpt. R, App. A Appendix A to Subpart R of Part 1926—Guidelines for Establishing the Components...

  8. 29 CFR Appendix A to Subpart R of... - Guidelines for Establishing the Components of a Site-specific Erection Plan: Non-mandatory...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... R of Part 1926 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH.... 1926, Subpt. R, App. A Appendix A to Subpart R of Part 1926—Guidelines for Establishing the Components...

  9. 29 CFR Appendix A to Subpart R of... - Guidelines for Establishing the Components of a Site-specific Erection Plan: Non-mandatory...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... R of Part 1926 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH.... 1926, Subpt. R, App. A Appendix A to Subpart R of Part 1926—Guidelines for Establishing the Components...

  10. The Woodlands Metro Center energy study. Case studies of project planning and design for energy conservation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-03-01

    Appendix II of The Woodlands Metro Center Energy Study near Houston consists of the following: Metro Center Program, Conventional Plan Building Prototypes and Detail Parcel Analysis, Energy Plan Building Prototypes, and Energy Plan Detail Parcel Analysis.

  11. 76 FR 76633 - Indian Tribal Governmental Plans; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-08

    ... Indian Tribal Governmental Plans; Correction AGENCY: Internal Revenue Service (IRS), Treasury. ACTION... are considering proposing relating to the determination of whether a plan of an Indian Tribal government is a governmental plan within the meaning of section 414(d) and contains an appendix that includes...

  12. Data summary of municipal solid waste management alternatives. Volume 3, Appendix A: Mass burn technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This appendix on Mass Burn Technologies is the first in a series designed to identify, describe and assess the suitability of several currently or potentially available generic technologies for the management of municipal solid waste (MSW). These appendices, which cover eight core thermoconversion, bioconversion and recycling technologies, reflect public domain information gathered from many sources. Representative sources include: professional journal articles, conference proceedings, selected municipality solid waste management plans and subscription technology data bases. The information presented is intended to serve as background information that will facilitate the preparation of the technoeconomic and life cycle mass, energy and environmental analysesmore » that are being developed for each of the technologies. Mass burn has been and continues to be the predominant technology in Europe for the management of MSW. In the United States, the majority of the existing waste-to-energy projects utilize this technology and nearly 90 percent of all currently planned facilities have selected mass burn systems. Mass burning generally refers to the direct feeding and combustion of municipal solid waste in a furnace without any significant waste preprocessing. The only materials typically removed from the waste stream prior to combustion are large bulky objects and potentially hazardous or undesirable wastes. The technology has evolved over the last 100 or so years from simple incineration to the most highly developed and commercially proven process available for both reducing the volume of MSW and for recovering energy in the forms of steam and electricity. In general, mass burn plants are considered to operate reliably with high availability.« less

  13. Satellite power systems (SPS) concept definition study. Volume 7: SPS program plan and economic analysis, appendixes

    NASA Technical Reports Server (NTRS)

    Hanley, G.

    1978-01-01

    Three appendixes in support of Volume 7 are contained in this document. The three appendixes are: (1) Satellite Power System Work Breakdown Structure Dictionary; (2) SPS cost Estimating Relationships; and (3) Financial and Operational Concept. Other volumes of the final report that provide additional detail are: Executive Summary; SPS Systems Requirements; SPS Concept Evolution; SPS Point Design Definition; Transportation and Operations Analysis; and SPS Technology Requirements and Verification.

  14. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 2, Appendixes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-10-01

    This document contains the appendixes for the remedial investigation and feasibility study for the David Witherspoon, Inc., 901 site in Knoxville, Tennessee. The following topics are covered in the appendixes: (A) David Witherspoon, Inc., 901 Site Historical Data, (B) Fieldwork Plans for the David Witherspoon, Inc., 901 Site, (C) Risk Assessment, (D) Remediation Technology Discussion, (E) Engineering Support Documentation, (F) Applicable or Relevant and Appropriate Requirements, and (G) Cost Estimate Documentation.

  15. 32 CFR Appendix D to Part 651 - Public Participation Plan

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Pt. 651, App. D Appendix D to Part 651... as news releases to local media, announcements to local citizens groups, and Commander's letters... have an interest in the environmental effects of the proposed action or activity (for example, hunters...

  16. 32 CFR Appendix D to Part 651 - Public Participation Plan

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Pt. 651, App. D Appendix D to Part 651... as news releases to local media, announcements to local citizens groups, and Commander's letters... have an interest in the environmental effects of the proposed action or activity (for example, hunters...

  17. 32 CFR Appendix D to Part 651 - Public Participation Plan

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Pt. 651, App. D Appendix D to Part 651... as news releases to local media, announcements to local citizens groups, and Commander's letters... have an interest in the environmental effects of the proposed action or activity (for example, hunters...

  18. 32 CFR Appendix D to Part 651 - Public Participation Plan

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Pt. 651, App. D Appendix D to Part 651... as news releases to local media, announcements to local citizens groups, and Commander's letters... have an interest in the environmental effects of the proposed action or activity (for example, hunters...

  19. 44 CFR Appendix B to Part 62 - National Flood Insurance Program

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false National Flood Insurance Program B Appendix B to Part 62 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... Plan to Maintain Financial Control for Business Written Under the Write Your Own Program. (a) In...

  20. 25 CFR Appendix A to Subpart E - IRR Program Functions That Are Not Otherwise Contractible

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... functions listed in this appendix cannot be included in a self-determination contract or self-governance... transportation improvement programs developed by tribes or other contractors; 2. Reviewing IRR long-range.... Reviewing long-range transportation plans; 3. Reviewing and approving IRR transportation improvement...

  1. 25 CFR Appendix A to Subpart E - IRR Program Functions That Are Not Otherwise Contractible

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... functions listed in this appendix cannot be included in a self-determination contract or self-governance... transportation improvement programs developed by tribes or other contractors; 2. Reviewing IRR long-range.... Reviewing long-range transportation plans; 3. Reviewing and approving IRR transportation improvement...

  2. 40 CFR 35.917 - Facilities planning (step 1).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... plans. (b) Facilities planning consists of those necessary plans and studies which directly relate to... environmental and social considerations. (See appendix A to this subpart.) (c) EPA requires full compliance with... be initiated before award of a step 1 grant or written approval of a plan of study (see § 35.920-3(a...

  3. Introduction to Sample Plan Package for Farms

    EPA Pesticide Factsheets

    An example of a completed and self-certified Tier I Qualified Facility SPCC Plan using the template found in Appendix G of the SPCC rule (40 CFR part 112). This example illustrates how to develop an SPCC Plan using a farm scenario.

  4. Report on the Comprehensive Survey of the Water Resources of the Delaware River Basin. Volume IX. Appendix P. Gross and Net Water Needs. Appendix Q. Formation of the Plan of Development. Appendix R. Water Control at Intermediate Upstream Levels. Appendix S. Salt Water Barrier.

    DTIC Science & Technology

    1960-12-01

    such as the Journal of the American Water Works Association, Public Works Magazine, Transactions of the American Society of Civil Engineers, reports of...American Water Works Associa- tion, August 1951. . .P-3 t I Picton 6/ related water use to population growth by application of trends in per capita...Committees on Public Works of the United States Senate and House of Representatives. Of the seven resolutions 1/ pertaining to this survey, five of them

  5. Chesapeake Bay Tidal Flooding Study. Appendix A. Problem Identification. Appendix B. Plan Formulation, Assessment and Evaluation. Appendix C. Recreation and Natural Resources.

    DTIC Science & Technology

    1984-09-01

    principal coordinating mechanism for the Study. Since its establishment, the Advisory Group advised the District Engineer regarding study policy and...standards. Finfish in the vicinity of Tilghrnan Island include those species typical for Bay waters having a salinity of 9-14 parts per thousand (ppt...usually reaches its highest point during the year in January and February, reflecting the area’s dependence on farming and fisheries. INSTITUTIONAL

  6. SU-E-T-50: Automatic Validation of Megavoltage Beams Modeled for Clinical Use in Radiation Therapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Melchior, M; Salinas Aranda, F; 21st Century Oncology, Ft. Myers, FL

    2014-06-01

    Purpose: To automatically validate megavoltage beams modeled in XiO™ 4.50 (Elekta, Stockholm, Sweden) and Varian Eclipse™ Treatment Planning Systems (TPS) (Varian Associates, Palo Alto, CA, USA), reducing validation time before beam-on for clinical use. Methods: A software application that can automatically read and analyze DICOM RT Dose and W2CAD files was developed using MatLab integrated development environment.TPS calculated dose distributions, in DICOM RT Dose format, and dose values measured in different Varian Clinac beams, in W2CAD format, were compared. Experimental beam data used were those acquired for beam commissioning, collected on a water phantom with a 2D automatic beam scanningmore » system.Two methods were chosen to evaluate dose distributions fitting: gamma analysis and point tests described in Appendix E of IAEA TECDOC-1583. Depth dose curves and beam profiles were evaluated for both open and wedged beams. Tolerance parameters chosen for gamma analysis are 3% and 3 mm dose and distance, respectively.Absolute dose was measured independently at points proposed in Appendix E of TECDOC-1583 to validate software results. Results: TPS calculated depth dose distributions agree with measured beam data under fixed precision values at all depths analyzed. Measured beam dose profiles match TPS calculated doses with high accuracy in both open and wedged beams. Depth and profile dose distributions fitting analysis show gamma values < 1. Relative errors at points proposed in Appendix E of TECDOC-1583 meet therein recommended tolerances.Independent absolute dose measurements at points proposed in Appendix E of TECDOC-1583 confirm software results. Conclusion: Automatic validation of megavoltage beams modeled for their use in the clinic was accomplished. The software tool developed proved efficient, giving users a convenient and reliable environment to decide whether to accept or not a beam model for clinical use. Validation time before beam-on for clinical use was reduced to a few hours.« less

  7. Information Resources Management Long Range Plan, FY 1995-1999

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Major IRM Program Accomplishments for FY 1993; Information Collection Budget; Summary of Computer Security Plans; Appendix: Acronym List.

  8. Y-12 Groundwater Protection Program Groundwater and Surface water Sampling and Analysis Plan for Calendar Year 2006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    2006-01-01

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2006 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2006 will be in accordance with DOE Order 540.1 requirements and the following goals: {sm_bullet} to maintain surveillance of existing and potential groundwater contamination sources; {sm_bullet} to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminantsmore » are most likely to migrate beyond the Oak Ridge Reservation property line; {sm_bullet} to identify and characterize long-term trends in groundwater quality at Y-12; and ! to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2006 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2006 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2006 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3; sample collection methods and procedures are described in Section 4; and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. The monitoring frequency and selection criteria for each sampling location is in Appendix C. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix D. If issued, addenda to this plan will be inserted in Appendix E, and Groundwater Monitoring Schedules (when issued) will be inserted in Appendix F. Guidance for managing purged groundwater is provided in Appendix G.« less

  9. 49 CFR Appendix E to Part 238 - General Principles of Reliability-Based Maintenance Programs

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... that have already occurred but were not evident to the operating crew. (b) Components or systems in a... shows decreasing reliability with increasing operating age. An age/time limit may be used to reduce the... maintenance of a component or system to protect the safety and operating capability of the equipment, a number...

  10. 49 CFR Appendix E to Part 238 - General Principles of Reliability-Based Maintenance Programs

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... that have already occurred but were not evident to the operating crew. (b) Components or systems in a... shows decreasing reliability with increasing operating age. An age/time limit may be used to reduce the... maintenance of a component or system to protect the safety and operating capability of the equipment, a number...

  11. 49 CFR Appendix E to Part 238 - General Principles of Reliability-Based Maintenance Programs

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... that have already occurred but were not evident to the operating crew. (b) Components or systems in a... shows decreasing reliability with increasing operating age. An age/time limit may be used to reduce the... maintenance of a component or system to protect the safety and operating capability of the equipment, a number...

  12. 49 CFR Appendix E to Part 238 - General Principles of Reliability-Based Maintenance Programs

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... that have already occurred but were not evident to the operating crew. (b) Components or systems in a... shows decreasing reliability with increasing operating age. An age/time limit may be used to reduce the... maintenance of a component or system to protect the safety and operating capability of the equipment, a number...

  13. 12 CFR Appendix B to Part 325 - Statement of Policy on Capital Adequacy

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Statement of Policy on Capital Adequacy B Appendix B to Part 325 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS... planning procedures and other factors important to the continuous maintenance of adequate capital. Adverse...

  14. 14 CFR Appendix A to Part 420 - Method for Defining a Flight Corridor

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Method for Defining a Flight Corridor A Appendix A to Part 420 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION... represents the launch vehicle the applicant plans to support at its launch point; (ii) Select a debris...

  15. 14 CFR Appendix A to Part 420 - Method for Defining a Flight Corridor

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Method for Defining a Flight Corridor A Appendix A to Part 420 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION... represents the launch vehicle the applicant plans to support at its launch point; (ii) Select a debris...

  16. 25 CFR Appendix A to Subpart D - Cultural Resource and Environmental Requirements for the IRR Program

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Cultural Resource and Environmental Requirements for the IRR Program A Appendix A to Subpart D Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian...

  17. 49 CFR Appendix D to Part 228 - Guidance on Fatigue Management Plans

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HOURS OF SERVICE OF RAILROAD EMPLOYEES Pt. 228, App. D Appendix D to..., Substantive Hours of Service Requirements for Train Employees Engaged in Commuter or Intercity Rail Passenger... fatigue experienced by their train employees subject to that subpart and to reduce the likelihood of...

  18. 14 CFR Appendix A to Part 420 - Method for Defining a Flight Corridor

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Method for Defining a Flight Corridor A Appendix A to Part 420 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION... represents the launch vehicle the applicant plans to support at its launch point; (ii) Select a debris...

  19. 14 CFR Appendix A to Part 63 - Test Requirements for Flight Navigator Certificate

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... data evaluate the accuracy of the prognostic weather map used for flight planning and apply this... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Test Requirements for Flight Navigator... TRANSPORTATION (CONTINUED) AIRMEN CERTIFICATION: FLIGHT CREWMEMBERS OTHER THAN PILOTS Pt. 63, App. A Appendix A...

  20. 14 CFR Appendix A to Part 63 - Test Requirements for Flight Navigator Certificate

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... data evaluate the accuracy of the prognostic weather map used for flight planning and apply this... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Test Requirements for Flight Navigator... TRANSPORTATION (CONTINUED) AIRMEN CERTIFICATION: FLIGHT CREWMEMBERS OTHER THAN PILOTS Pt. 63, App. A Appendix A...

  1. 14 CFR Appendix A to Part 63 - Test Requirements for Flight Navigator Certificate

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... data evaluate the accuracy of the prognostic weather map used for flight planning and apply this... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Test Requirements for Flight Navigator... TRANSPORTATION (CONTINUED) AIRMEN CERTIFICATION: FLIGHT CREWMEMBERS OTHER THAN PILOTS Pt. 63, App. A Appendix A...

  2. 14 CFR Appendix A to Part 63 - Test Requirements for Flight Navigator Certificate

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... data evaluate the accuracy of the prognostic weather map used for flight planning and apply this... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Test Requirements for Flight Navigator... TRANSPORTATION (CONTINUED) AIRMEN CERTIFICATION: FLIGHT CREWMEMBERS OTHER THAN PILOTS Pt. 63, App. A Appendix A...

  3. 40 CFR Appendix D to Part 300 - Appropriate Actions and Methods of Remedying Releases

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SUBSTANCES POLLUTION CONTINGENCY PLAN Pt. 300, App. D Appendix D to Part 300—Appropriate Actions and Methods... contaminated soil, sediment, or waste, the following types of response actions shall generally be considered: removal, treatment, or containment of the soil, sediment, or waste to reduce or eliminate the potential...

  4. Rotorcraft Drivetrain Life Safety and Reliability (Cycle de Vie, Securite et Fiabilite des Chaines Dynamiques des Avions a Voilure Tournante)

    DTIC Science & Technology

    1990-06-01

    design and component technologies are reviewed against a background of accident data analysis , resulting in grounds for confidence in higher safety levels...constructors or operators taking voluntary actions based on accident investigations and their own data . Analysis of the CAA Summaty data (Appendix 3...of engines. In the accident data analysis in Appendix 3, insufficient data was available to determine whether rotor configuration or associated

  5. Asbestos Model Accreditation Plan (MAP) Enforcement Response Policy

    EPA Pesticide Factsheets

    The Asbestos Model Accreditation Plan (MAP) (40 CFR 763 Subpart E Appendix C) mandates safety training for those who do asbestos removal work, and implements the additional training requirements mandated by Congress

  6. Bicycle Safety Action Plan : Appendix A

    DOT National Transportation Integrated Search

    2012-09-01

    The Arizona Department of Transportation (ADOT) Bicycle Safety Action Plan (BSAP) identifies improvements, programs, and strategies that, upon their implementation, will reduce the frequency of bicyclist fatalities and injury crashes that occur on th...

  7. 75 FR 53268 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... relations, Penalties, Reporting and recordkeeping requirements, Superfund, Water pollution control, Water... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan...

  8. Summary Document: Restoration Plan for Major Airports after a Bioterrorist Attack

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Raber, E

    2007-01-11

    This document provides general guidelines for developing a Restoration Plan for a major airport following release of a biological warfare agent. San Francisco International Airport was selected as the example airport during development of the Plan to illustrate specific details. The spore forming bacterium Bacillus anthracis was selected as the biological agent of primary concern because it is the most difficult of known bioterrorism agents to inactivate and is considered to be one of the agents most likely to be used as a biological weapon. The focus of the Plan is on activities associated with the Characterization, Remediation, and Clearancemore » Phases that are defined herein. Activities associated with the Notification and First-Response Phases are briefly discussed in Appendixes A and B, respectively. In addition to the main text of this Plan and associated appendixes, a data supplement was developed specifically for San Francisco International Airport. Requests for the data supplement must be made directly to the Emergency Planning Operations Division of San Francisco International Airport.« less

  9. 25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...

  10. 25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...

  11. 25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...

  12. 25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...

  13. 25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...

  14. 10 CFR 30.35 - Financial assurance and recordkeeping for decommissioning.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... set forth in appendix B to part 30 shall submit a decommissioning funding plan as described in paragraph (e) of this section. The decommissioning funding plan must also be submitted when a combination of... funding plan as described in paragraph (e) of this section. The decommissioning funding plan must be...

  15. 10 CFR 30.35 - Financial assurance and recordkeeping for decommissioning.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... set forth in appendix B to part 30 shall submit a decommissioning funding plan as described in paragraph (e) of this section. The decommissioning funding plan must also be submitted when a combination of... funding plan as described in paragraph (e) of this section. The decommissioning funding plan must be...

  16. 10 CFR 30.35 - Financial assurance and recordkeeping for decommissioning.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... set forth in appendix B to part 30 shall submit a decommissioning funding plan as described in paragraph (e) of this section. The decommissioning funding plan must also be submitted when a combination of... funding plan as described in paragraph (e) of this section. The decommissioning funding plan must be...

  17. Feed-pump hydraulic performance and design improvement, Phase I: research program design. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, W.H.; Gopalakrishnan, S.; Fehlau, R.

    1982-03-01

    As a result of prior EPRI-sponsored studies, it was concluded that a research program should be designed and implemented to provide an improved basis for the design, procurement, testing, and operation of large feed pumps with increased reliability and stability over the full range of operating conditions. This two-volume report contains a research plan which is based on a review of the present state of the art and which defines the necessary R and D program and estimates the benefits and costs of the program. The recommended research program consists of 30 interrelated tasks. It is designed to perform themore » needed research; to verify the results; to develop improved components; and to publish computer-aided design methods, pump specification guidelines, and a troubleshooting manual. Most of the technology proposed in the research plan is applicable to nuclear power plants as well as to fossil-fired plants. This volume contains appendixes on pump design, cavitation damage, performance testing, hydraulics, two-phase flow in pumps, flow stability, and rotor dynamics.« less

  18. 76 FR 50164 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ..., Reporting and recordkeeping requirements, Superfund, Water pollution control, Water supply. Authority: 33 U... and Hazardous Substance Pollution Contingency Plan National Priorities List: Deletion of the Pasley..., as amended, is an Appendix of the National Oil and Hazardous Substances Pollution Contingency Plan...

  19. 40 CFR Appendix to Subpart M of... - Alphabetical Listing of Tribes and Corresponding Sections

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Alphabetical Listing of Tribes and... Implementation Plans for Tribes-Region X Pt. 49, Subpt. M, App. Appendix to Subpart M of Part 49—Alphabetical Listing of Tribes and Corresponding Sections Indian Tribe Refer to the following sections in subpart M...

  20. 40 CFR Appendix to Subpart M of... - Alphabetical Listing of Tribes and Corresponding Sections

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Alphabetical Listing of Tribes and... Implementation Plans for Tribes-Region X Pt. 49, Subpt. M, App. Appendix to Subpart M of Part 49—Alphabetical Listing of Tribes and Corresponding Sections Indian Tribe Refer to the following sections in subpart M...

  1. 40 CFR Appendix to Subpart M of... - Alphabetical Listing of Tribes and Corresponding Sections

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Alphabetical Listing of Tribes and... Implementation Plans for Tribes-Region X Pt. 49, Subpt. M, App. Appendix to Subpart M of Part 49—Alphabetical Listing of Tribes and Corresponding Sections Indian Tribe Refer to the following sections in subpart M...

  2. 14 CFR Appendix K to Part 25 - Extended Operations (ETOPS)

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Appendix C of this part with a liquid water content factor of 1.0. (iii) Ice accumulated during approach... engine control or the desired thrust or power level was not achieved, including engine flameouts. Planned... involved. A relevant problem is a problem with an ETOPS group 1 significant system that has or could result...

  3. 49 CFR Appendix C to Part 21 - Application of Part 21 to Certain Federal Financial Assistance of the Department of Transportation

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... TRANSPORTATION-EFFECTUATION OF TITLE VI OF THE CIVIL RIGHTS ACT OF 1964 Pt. 21, App. C Appendix C to Part 21... Nondiscrimination on Federally Assisted Projects (a) Examples. The following examples, without being exhaustive... retained for, or incidental to, construction, planning, research, highway safety, engineering, property...

  4. 49 CFR Appendix C to Part 21 - Application of Part 21 to Certain Federal Financial Assistance of the Department of Transportation

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... TRANSPORTATION-EFFECTUATION OF TITLE VI OF THE CIVIL RIGHTS ACT OF 1964 Pt. 21, App. C Appendix C to Part 21... Nondiscrimination on Federally Assisted Projects (a) Examples. The following examples, without being exhaustive... to, construction, planning, research, highway safety, engineering, property management, and fee...

  5. 49 CFR Appendix C to Part 21 - Application of Part 21 to Certain Federal Financial Assistance of the Department of Transportation

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TRANSPORTATION-EFFECTUATION OF TITLE VI OF THE CIVIL RIGHTS ACT OF 1964 Pt. 21, App. C Appendix C to Part 21... Nondiscrimination on Federally Assisted Projects (a) Examples. The following examples, without being exhaustive... retained for, or incidental to, construction, planning, research, highway safety, engineering, property...

  6. 49 CFR Appendix C to Part 21 - Application of Part 21 to Certain Federal Financial Assistance of the Department of Transportation

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRANSPORTATION-EFFECTUATION OF TITLE VI OF THE CIVIL RIGHTS ACT OF 1964 Pt. 21, App. C Appendix C to Part 21... Nondiscrimination on Federally Assisted Projects (a) Examples. The following examples, without being exhaustive... retained for, or incidental to, construction, planning, research, highway safety, engineering, property...

  7. 49 CFR Appendix C to Part 21 - Application of Part 21 to Certain Federal Financial Assistance of the Department of Transportation

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... TRANSPORTATION-EFFECTUATION OF TITLE VI OF THE CIVIL RIGHTS ACT OF 1964 Pt. 21, App. C Appendix C to Part 21... Nondiscrimination on Federally Assisted Projects (a) Examples. The following examples, without being exhaustive... retained for, or incidental to, construction, planning, research, highway safety, engineering, property...

  8. Cost Estimates by Program Mechanism, Appendix K. Vol. II, A Plan for Managing the Development, Implementation and Operation of a Model Elementary Teacher Education Program.

    ERIC Educational Resources Information Center

    Cole, R. D.; Hamreus, D. G.

    This appendix presents the following tables of program component cost estimates: 1) instructional design and development; 2) instructional operations; 3) program management--policy creation and adoption, and policy and program execution; 4) program coordination--instructional objectives, adaptation, accommodation, and dissemination; 5) general…

  9. Saugus River and Tributaries, Lynn Malden, Revere and Saugus, Massachusetts. Flood Damage Reduction. Volume 4. Appendix G. Economics. Appendix H. Socioeconomic.

    DTIC Science & Technology

    1989-06-01

    is not accessible by subway from Boston. Policy guidance for evaluation of recreational facilities for structural flood reduction plans require that...Trapelo Road Waltham, Massachusetts Prepared By: IEP, Inc. P.O. Box 1840 90 Route 6A/Sextant Hill Sandwich , Massachusetts 02563 EPnc. Table of Contents

  10. 29 CFR Appendix A to Subpart P to... - Model Fire Safety Plan (Non-Mandatory)

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Subpart P to Part 1915 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH... Fire Protection in Shipyard Employment Pt. 1915, Subpt. P, App. A Appendix A to Subpart P to Part 1915... fire. D. Potential ignition sources for fires and how to control them. E. Types of fire protection...

  11. 29 CFR Appendix A to Subpart P to... - Model Fire Safety Plan (Non-Mandatory)

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Subpart P to Part 1915 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH... Fire Protection in Shipyard Employment Pt. 1915, Subpt. P, App. A Appendix A to Subpart P to Part 1915... fire. D. Potential ignition sources for fires and how to control them. E. Types of fire protection...

  12. Oregon's acts, cross-jurisdictional collaboration and improved transportation planning : final report : appendices.

    DOT National Transportation Integrated Search

    2009-01-01

    This appendix summarizes interviews completed as part of an Oregon Department of : Transportation (ODOT) research study titled, Oregons ACTs, Cross-Jurisdictional : Collaboration and Improved Transportation Planning. The research was conduct...

  13. Appendix A, Plan Projects as amended for Financial Constraint

    DOT National Transportation Integrated Search

    1995-04-13

    The Ohio-Kentucky-Indiana Regional Council of Governments (OKI) provides : coordinated regional transportation planning for an eight county area. This : document contains tables showing, by county, statistical data on road project : projections for o...

  14. Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental LLC

    2009-09-01

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2010 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2010 will be in accordance with requirements of DOE Order 540.1A and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contaminationmore » and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2010 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation. Modifications to the CY 2010 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2010 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2010) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.« less

  15. 75 FR 57055 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Utah Prairie Dog

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ...] Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Utah Prairie Dog AGENCY: Fish... recovery plan for the Utah prairie dog (Cynomys parvidens). This species is federally listed as threatened... and peer reviewers in an appendix to the approved recovery plan. The Utah prairie dog (Cynomys...

  16. 31 CFR Appendix A to Subpart C of... - Examples

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... this example, an individual covered by the Police and Firefighters Plan hired before 1980 retires in... the Police and Firefighters Plan was hired earlier than in example 1A and thus performed more service... this example, an individual covered by the Police and Firefighters Plan and hired before 1980 retires...

  17. 76 FR 58404 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-21

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... opportunities for investigation and soil remediation, if the Program's Work Group determines that lead in...

  18. 76 FR 11350 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). This partial deletion pertains to the soil and ground water associated with the northern 62-acre parcel. After this...

  19. 76 FR 18136 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Norwood... amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The... we view this as a noncontroversial revision and anticipate no adverse comment. We have explained our...

  20. 75 FR 54821 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List; Intent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List; Intent for Partial... amended, is an Appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The... Superfund Site without prior Notice of Intent for Partial Deletion because EPA views this as a...

  1. 75 FR 43115 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-23

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Intent to Partially..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... Intent for Partial Deletion because EPA views this as a noncontroversial revision and anticipates no...

  2. 76 FR 45484 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... PBL Superfund Site without prior Notice of Intent for Deletion because EPA views this as a...

  3. 14 CFR Appendix A to Part 1204 - Items To Cover in Memoranda of Agreement

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... information required for development planning and constitute a resource that can often save Federal planners... Circular A-95 clearinghouses for coordinating NASA and civilian planning: 1. Clearinghouses will be contacted at the earliest practicable point in project planning. Generally, this will be during the...

  4. 40 CFR Appendix N to Part 50 - Interpretation of the National Ambient Air Quality Standards for PM2.5

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... monitors utilize the same specific sampling and analysis method. Combined site data record is the data set... monitors are suitable monitors designated by a state or local agency in their annual network plan (and in... appendix. Seasonal sampling is the practice of collecting data at a reduced frequency during a season of...

  5. 23 CFR Appendix D to Subpart A of... - Guidance Criteria for Evaluating Requests for Modifications to the National Highway System

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Guidance Criteria for Evaluating Requests for Modifications to the National Highway System D Appendix D to Subpart A of Part 470 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH HIGHWAY SYSTEMS Federal-aid Highway Systems Pt...

  6. 23 CFR Appendix D to Subpart A of... - Guidance Criteria for Evaluating Requests for Modifications to the National Highway System

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Guidance Criteria for Evaluating Requests for Modifications to the National Highway System D Appendix D to Subpart A of Part 470 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH HIGHWAY SYSTEMS Federal-aid Highway Systems Pt...

  7. 23 CFR Appendix D to Subpart A of... - Guidance Criteria for Evaluating Requests for Modifications to the National Highway System

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Guidance Criteria for Evaluating Requests for Modifications to the National Highway System D Appendix D to Subpart A of Part 470 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH HIGHWAY SYSTEMS Federal-aid Highway Systems Pt...

  8. An Evaluation of Project Learning Tree in British Columbia. Appendices.

    ERIC Educational Resources Information Center

    Conry, Robert F.; And Others

    The volume contains seven appendices (A-G) which accompany the first volume. Appendix A provides a list of project personnel and of teachers who participated in the unit development workshop. Appendix B, composed of six sections, includes the unit lesson plans and teachers' guides used in the field study for grades 3, 5, and 7. The grade materials…

  9. Skylab experimental performance evaluation manual. Appendix D: Experiment M487 habitability/crew quarters (MSFC)

    NASA Technical Reports Server (NTRS)

    Purushotham, K. S.

    1973-01-01

    This appendix contains a series of analyses for Experiment M487, Habitability/ Crew Quarters (MSFC), to be used for evaluating the performance of the Skylab corollary experiments under preflight, inflight, and post flight conditions. Experiment contingency plan workaround procedure and malfunction analyses are presented in order to assist in making the experiment operationally successful.

  10. 23 CFR Appendix B to Subpart A of... - Designation of Segments of Section 332(a)(2) Corridors as Parts of the Interstate System

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... as Parts of the Interstate System B Appendix B to Subpart A of Part 470 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH HIGHWAY SYSTEMS Federal-aid Highway Systems Pt...) Corridors as Parts of the Interstate System The following guidance is comparable to current procedures for...

  11. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, A. J.; Lantow, Tiffany A.

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division ofmore » Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.« less

  12. Reliable multicast protocol specifications protocol operations

    NASA Technical Reports Server (NTRS)

    Callahan, John R.; Montgomery, Todd; Whetten, Brian

    1995-01-01

    This appendix contains the complete state tables for Reliable Multicast Protocol (RMP) Normal Operation, Multi-RPC Extensions, Membership Change Extensions, and Reformation Extensions. First the event types are presented. Afterwards, each RMP operation state, normal and extended, is presented individually and its events shown. Events in the RMP specification are one of several things: (1) arriving packets, (2) expired alarms, (3) user events, (4) exceptional conditions.

  13. NASA Information Resources Management Long Range Plan, FY 1994-1998

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Program Specific IRM Activities by Program Office; Major IRM Program Accomplishments for FY 1992; Information Collection Budget; Summary of Computer Security Plans; and Appendix: Acronym List.

  14. Appendix to project memorandum : metropolitan planning reviews : examples of MPO documentation

    DOT National Transportation Integrated Search

    1995-05-16

    On November 26, 1991 Congress enacted the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). This legislation mandates that Transportation Management Areas (urbanized areas with populations over 200,000) include as part of the planning...

  15. 40 CFR Appendix II to Part 92 - Interpretive Ruling for § 92.705-Remedial Plans

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... nonconformity of any such vehicles or engines. The plan shall provide that the manufacturer will remedy, at the manufacturer's expense, all properly maintained and used vehicles which experienced the nonconformity during...

  16. Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 8, Appendix B (contd)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-05-01

    This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix B cover the following wells: 299-W18-21; 299-W18-22; 299-W18-23; 299-W18-24. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

  17. 2 CFR Appendix A to Part 225 - General Principles for Determining Allowable Costs

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... department or agency 15. Indirect cost rate proposal 16. Local government 17. Public assistance cost... plan, public assistance cost allocation plan, and indirect cost rate proposal. Each of these terms is..., or any agency or instrumentality of a local government. 17. “Public assistance cost allocation plan...

  18. 10 CFR Appendix D to Subpart D of... - Classes of Actions that Normally Require EISs

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...] D7Contracts, policies, and marketing and allocation plans for electric power D8Import or export of natural gas... and Allocation Plans for Electric Power Establishment and implementation of contracts, policies, and marketing and allocation plans related to electric power acquisition that involve (1) The interconnection of...

  19. 10 CFR Appendix D to Subpart D of... - Classes of Actions that Normally Require EISs

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...] D7Contracts, policies, and marketing and allocation plans for electric power D8Import or export of natural gas... and Allocation Plans for Electric Power Establishment and implementation of contracts, policies, and marketing and allocation plans related to electric power acquisition that involve (1) The interconnection of...

  20. 75 FR 47521 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List: Intent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List: Intent To Delete the... appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the... Corporation (Markhams) Superfund Site without prior notice of intent to delete because we view this as a...

  1. 75 FR 27255 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ... requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Intent to Delete the..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan...

  2. 76 FR 71500 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... requirements, Superfund, Water pollution control, Water Supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601... and Hazardous Substances Pollution Contingency Plan National Priorities List: Deletion of the Martin... appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). EPA, with the...

  3. 10 CFR 70.25 - Financial assurance and recordkeeping for decommissioning.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... this section shall submit a decommissioning funding plan as described in paragraph (e) of this section... quantities set forth in appendix B to part 30. A decommissioning funding plan must also be submitted when a... quantities specified in paragraph (d) of this section shall either— (1) Submit a decommissioning funding plan...

  4. 10 CFR 70.25 - Financial assurance and recordkeeping for decommissioning.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... this section shall submit a decommissioning funding plan as described in paragraph (e) of this section... quantities set forth in appendix B to part 30. A decommissioning funding plan must also be submitted when a... quantities specified in paragraph (d) of this section shall either— (1) Submit a decommissioning funding plan...

  5. 10 CFR 70.25 - Financial assurance and recordkeeping for decommissioning.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... this section shall submit a decommissioning funding plan as described in paragraph (e) of this section... quantities set forth in appendix B to part 30. A decommissioning funding plan must also be submitted when a... quantities specified in paragraph (d) of this section shall either— (1) Submit a decommissioning funding plan...

  6. 10 CFR 70.25 - Financial assurance and recordkeeping for decommissioning.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... this section shall submit a decommissioning funding plan as described in paragraph (e) of this section... quantities set forth in appendix B to part 30. A decommissioning funding plan must also be submitted when a... quantities specified in paragraph (d) of this section shall either— (1) Submit a decommissioning funding plan...

  7. Transportation technology program: Strategic plan

    NASA Astrophysics Data System (ADS)

    1991-09-01

    The purpose of this report is to define the technology program required to meet the transportation technology needs for current and future civil space missions. It is a part of an integrated plan, prepared by NASA in part in response to the Augustine Committee recommendations, to describe and advocate expanded and more aggressive efforts in the development of advanced space technologies. This expanded program will provide a technology basis for future space missions to which the U.S. aspires, and will help to regain technology leadership for the U.S. on a broader front. The six aspects of this integrated program/plan deal with focused technologies to support space sciences, exploration, transportation, platforms, and operations as well as provide a Research and Technology Base Program. This volume describes the technologies needed to support transportation systems, e.g., technologies needed for upgrades to current transportation systems and to provide reliable and efficient transportation for future space missions. The Office of Aeronautics, Exploration, and Technology (OAET) solicited technology needs from the major agency technology users and the aerospace industry community and formed a transportation technology team (appendix A) to develop a technology program to respond to those needs related to transportation technologies. This report addresses the results of that team activity. It is a strategic plan intended for use as a planning document rather than as a project management tool. It is anticipated that this document will be primarily utilized by research & technology (R&T) management at the various NASA Centers as well as by officials at NASA Headquarters and by industry in planning their corporate Independent Research and Development (IR&D) investments.

  8. Transportation technology program: Strategic plan

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The purpose of this report is to define the technology program required to meet the transportation technology needs for current and future civil space missions. It is a part of an integrated plan, prepared by NASA in part in response to the Augustine Committee recommendations, to describe and advocate expanded and more aggressive efforts in the development of advanced space technologies. This expanded program will provide a technology basis for future space missions to which the U.S. aspires, and will help to regain technology leadership for the U.S. on a broader front. The six aspects of this integrated program/plan deal with focused technologies to support space sciences, exploration, transportation, platforms, and operations as well as provide a Research and Technology Base Program. This volume describes the technologies needed to support transportation systems, e.g., technologies needed for upgrades to current transportation systems and to provide reliable and efficient transportation for future space missions. The Office of Aeronautics, Exploration, and Technology (OAET) solicited technology needs from the major agency technology users and the aerospace industry community and formed a transportation technology team (appendix A) to develop a technology program to respond to those needs related to transportation technologies. This report addresses the results of that team activity. It is a strategic plan intended for use as a planning document rather than as a project management tool. It is anticipated that this document will be primarily utilized by research & technology (R&T) management at the various NASA Centers as well as by officials at NASA Headquarters and by industry in planning their corporate Independent Research and Development (IR&D) investments.

  9. The NASA planning process, appendix D. [as useful planning approach for solving urban problems

    NASA Technical Reports Server (NTRS)

    Annett, H. A.

    1973-01-01

    The planning process is outlined which NASA used in making some fundamental post-Apollo decisions concerning the reuseable space shuttle and the orbiting laboratory. It is suggested that the basic elements and principles of the process, when combined, form a useful planning approach for solving urban problems. These elements and principles are defined along with the basic strengths of the planning model.

  10. Groundwater Interim Measures Work Plan for the Former Chemical Plant

    EPA Pesticide Factsheets

    May 2012 Groundwater IMWP, revised per EPA's approval, focuses on the installation of a groundwater containment system to mitigate groundwater migration from the former plant. A prior 2002 work plan is included in its entirety in Appendix B.

  11. 29 CFR Appendix to Subpart E of... - Exit Routes, Emergency Action Plans, and Fire Prevention Plans

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... necessary. Essential plant operations may include the monitoring of plant power supplies, water supplies... detect fuel leaks. An example is a temperature limit switch often found on deep-fat food fryers found in...

  12. California-Baja California border master plan - plan maestro fronterizo California-Baja California : technical appendix.

    DOT National Transportation Integrated Search

    2008-09-01

    Under the direction of the U.S. / Mexico Joint Working Committee, the California Department of : Transportation (Caltrans) and the State of Baja Californias Secretariat of Infrastructure and Urban : Development (SIDUE) hereby establish the Califor...

  13. TITAN II Reliability and Aging Surveillance Program (RASP)

    DTIC Science & Technology

    1982-02-05

    n il =a+, •’ - -10 dP 0 0% Řj F’l ~ N N N N m N U & p DI-I Go co %0 ( n (q en LA LA...Results of these tests will be submitted as an appendix to this report as they became available. See reference Appendix A and subsequent. Noun P / N NSN...JUN14 1982 ior publie release andsleitA 0 - --- ---- -- t.Iit~htiI1i ulii7 d TABLE OF C ENTS Page 1.0 n OUCrN 1 2.0 BACKGRJND

  14. 12 CFR Appendix F to Part 226 - Annual Percentage Rate Computations for Certain Open-End Credit Plans

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... adjusted balance (previous balance less payments and credits) and the consumer made a payment of $50 at the... convenience of the user, the revised text is set forth as follows: Pt. 226, App. F, Nt. Appendix F to Part 226... rate applies only to an adjusted balance (previous balance less payments and credits) and the consumer...

  15. 29 CFR Appendix B to Part 4050 - Examples of Benefit Payments for Missing Participants Under §§ 4050.8 Through 4050.10

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 9 2014-07-01 2014-07-01 false Examples of Benefit Payments for Missing Participants Under...) PENSION BENEFIT GUARANTY CORPORATION PLAN TERMINATIONS MISSING PARTICIPANTS Pt. 4050, App. B Appendix B to Part 4050—Examples of Benefit Payments for Missing Participants Under §§ 4050.8 Through 4050.10 The...

  16. 29 CFR Appendix B to Part 4050 - Examples of Benefit Payments for Missing Participants Under §§ 4050.8 Through 4050.10

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 9 2011-07-01 2011-07-01 false Examples of Benefit Payments for Missing Participants Under...) PENSION BENEFIT GUARANTY CORPORATION PLAN TERMINATIONS MISSING PARTICIPANTS Pt. 4050, App. B Appendix B to Part 4050—Examples of Benefit Payments for Missing Participants Under §§ 4050.8 Through 4050.10 The...

  17. 29 CFR Appendix B to Part 4050 - Examples of Benefit Payments for Missing Participants Under §§ 4050.8 Through 4050.10

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 9 2012-07-01 2012-07-01 false Examples of Benefit Payments for Missing Participants Under...) PENSION BENEFIT GUARANTY CORPORATION PLAN TERMINATIONS MISSING PARTICIPANTS Pt. 4050, App. B Appendix B to Part 4050—Examples of Benefit Payments for Missing Participants Under §§ 4050.8 Through 4050.10 The...

  18. 29 CFR Appendix B to Part 4050 - Examples of Benefit Payments for Missing Participants Under §§ 4050.8 Through 4050.10

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Examples of Benefit Payments for Missing Participants Under...) PENSION BENEFIT GUARANTY CORPORATION PLAN TERMINATIONS MISSING PARTICIPANTS Pt. 4050, App. B Appendix B to Part 4050—Examples of Benefit Payments for Missing Participants Under §§ 4050.8 Through 4050.10 The...

  19. Theater Security Cooperation: The Military Engagement Team. Lessons and Best Practices

    DTIC Science & Technology

    2017-01-01

    Reproduction of this publication is welcomed and highly encouraged. Theater Security Cooperation: The Military Engagement Team FOLLOW CALL ON SOCIAL...Cooperation: The MET Table of Contents Chapter 1. Military Engagement Team 1 Chapter 2. Predeployment Training 7 Chapter 3. Engagement Planning 13...Chapter 4. Engagement Execution 19 Chapter 5. Engagement Closeout 23 Appendix A. Military Engagement Team Position Descriptions and Duties 27 Appendix

  20. What have we learned about ITS? Appendix : summary tables

    DOT National Transportation Integrated Search

    1999-10-01

    This report recommends the development of a national intelligent transportation system (ITS) program for intermodal freight that will promote the application of ITS technology to enhance the safety, reliability, and responsiveness of the intermodal f...

  1. High Strength Steel Weldment Reliability: Weld Metal Hydrogen Trapping.

    DTIC Science & Technology

    1998-02-01

    Reliability : Weld Metal Hydrogen Trapping submitted to : United States Army Research Office Materials Science Division P.O. Box 12211 Research Triangle...Conf. Proc. of Welding and Related Technologies for the XXIth Century, November 1998, Kiev, Ukraine : "Hydrogen Assisted Cracking in...appendices (see appendix IV). Next TTCP workshop will be held from 6th to 8th October 1998, at CANMET , Ottawa, Ontario, Canada. 20 III. Figures 18

  2. Spaceflight tracking and data network operational reliability computer output for MTBF and availability. Appendix V to CSC-1-395

    NASA Technical Reports Server (NTRS)

    Seneca, V. I.; Mlynarczyk, R. H.

    1974-01-01

    Tables of data are provided to show the availability of Skylab data to selected ground stations during the phases of Skylab preflight, Skylab unmanned condition, and Skylab manned condition. The mean time between failure (MTBF) of the same Skylab functions is tabulated for the selected ground stations. All reliability data are based on a 90 percent confidence interval.

  3. Biodiesel Test Plan

    DTIC Science & Technology

    2014-07-01

    Biodiesel Test Plan Distribution Statement A: Approved for Public Release; distribution is unlimited. July 2014 Report No. CG-D-07-14...Appendix C) Biodiesel Test Plan ii UNCLAS//Public | CG-926 R&DC | G. W. Johnson, et al. Public | July 2014 N O T I C E This...Development Center 1 Chelsea Street New London, CT 06320 Biodiesel Test Plan iii UNCLAS//Public | CG-926 R&DC | G. W. Johnson, et al

  4. 77 FR 50070 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ..., Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Hooker..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan...

  5. Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 4, Appendix A (contd)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-05-01

    This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix A cover the following wells: 299-E33-30; 299-E34-2; 299-E34-3; 299-E34-4; 299-E34-5; 299-E34-6. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

  6. 14 CFR Appendix A to Part 158 - Assurances

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... State and local laws and regulations. 4. Environmental, airspace and airport layout plan requirements... appropriate airspace finding has been made; and (c) The FAA Airport Layout Plan with respect to the project... airport design, construction and equipment standards and specifications contained in advisory circulars...

  7. 14 CFR Appendix A to Part 158 - Assurances

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... State and local laws and regulations. 4. Environmental, airspace and airport layout plan requirements... appropriate airspace finding has been made; and (c) The FAA Airport Layout Plan with respect to the project... airport design, construction and equipment standards and specifications contained in advisory circulars...

  8. 14 CFR Appendix A to Part 158 - Assurances

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... State and local laws and regulations. 4. Environmental, airspace and airport layout plan requirements... appropriate airspace finding has been made; and (c) The FAA Airport Layout Plan with respect to the project... airport design, construction and equipment standards and specifications contained in advisory circulars...

  9. 14 CFR Appendix A to Part 158 - Assurances

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... State and local laws and regulations. 4. Environmental, airspace and airport layout plan requirements... appropriate airspace finding has been made; and (c) The FAA Airport Layout Plan with respect to the project... airport design, construction and equipment standards and specifications contained in advisory circulars...

  10. 14 CFR Appendix A to Part 158 - Assurances

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... State and local laws and regulations. 4. Environmental, airspace and airport layout plan requirements... appropriate airspace finding has been made; and (c) The FAA Airport Layout Plan with respect to the project... airport design, construction and equipment standards and specifications contained in advisory circulars...

  11. 41 CFR 102-37.150 - What must a State legislature include in the plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... set forth in Appendix B of this part. It may also include in the plan other provisions not inconsistent with the purposes of title 40 of the United States Code and the requirements of this part. [67 FR...

  12. 12 CFR Appendix B to Part 363 - Illustrative Management Reports

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... with governance, management, and other personnel, designed to provide reasonable assurance regarding..., designed to provide reasonable assurance regarding the reliability of financial reporting and the... designed and effected by those charged with governance, management, and other personnel, to provide...

  13. 12 CFR Appendix B to Part 363 - Illustrative Management Reports

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... with governance, management, and other personnel, designed to provide reasonable assurance regarding..., designed to provide reasonable assurance regarding the reliability of financial reporting and the... designed and effected by those charged with governance, management, and other personnel, to provide...

  14. 12 CFR Appendix B to Part 363 - Illustrative Management Reports

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... with governance, management, and other personnel, designed to provide reasonable assurance regarding..., designed to provide reasonable assurance regarding the reliability of financial reporting and the... designed and effected by those charged with governance, management, and other personnel, to provide...

  15. 12 CFR Appendix B to Part 363 - Illustrative Management Reports

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... with governance, management, and other personnel, designed to provide reasonable assurance regarding..., designed to provide reasonable assurance regarding the reliability of financial reporting and the... designed and effected by those charged with governance, management, and other personnel, to provide...

  16. 12 CFR Appendix B to Part 363 - Illustrative Management Reports

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... with governance, management, and other personnel, designed to provide reasonable assurance regarding..., designed to provide reasonable assurance regarding the reliability of financial reporting and the... designed and effected by those charged with governance, management, and other personnel, to provide...

  17. Traveler information services in rural tourism areas : appendix C, observations at tourist interactions with kiosks

    DOT National Transportation Integrated Search

    2000-06-30

    This report presents a series of observations of tourists' experiences with kiosks providing traveler information services at rural tourism areas. The kiosks were assessed in five areas: reliability visibility, usability, usefulness, and adaptability...

  18. 40 CFR Appendix A to Subpart I of... - Determination of Allowable Costs

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... built in conformance with the design drawings and specifications. f. The costs (including legal... from defects in the plans, design drawings and specifications, or other subagreement documents only to... of architectural or engineering services incurred in preparing a facilities plan and the design...

  19. 40 CFR Appendix A to Subpart I of... - Determination of Allowable Costs

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... built in conformance with the design drawings and specifications. f. The costs (including legal... from defects in the plans, design drawings and specifications, or other subagreement documents only to... of architectural or engineering services incurred in preparing a facilities plan and the design...

  20. 22 CFR Appendix I to Part 211 - Operational Plan

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... for the selection of the geographical areas where programs will be carried out; the calculation of... extension services. Describe specific areas of collaboration relative to program purposes. (6) Monitoring...) and (b), will be met. 5. Logistics. Provide a logistics plan that demonstrates the adequacy and...

  1. 22 CFR Appendix I to Part 211 - Operational Plan

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... for the selection of the geographical areas where programs will be carried out; the calculation of... extension services. Describe specific areas of collaboration relative to program purposes. (6) Monitoring...) and (b), will be met. 5. Logistics. Provide a logistics plan that demonstrates the adequacy and...

  2. 22 CFR Appendix I to Part 211 - Operational Plan

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... for the selection of the geographical areas where programs will be carried out; the calculation of... extension services. Describe specific areas of collaboration relative to program purposes. (6) Monitoring...) and (b), will be met. 5. Logistics. Provide a logistics plan that demonstrates the adequacy and...

  3. 22 CFR Appendix I to Part 211 - Operational Plan

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... for the selection of the geographical areas where programs will be carried out; the calculation of... extension services. Describe specific areas of collaboration relative to program purposes. (6) Monitoring...) and (b), will be met. 5. Logistics. Provide a logistics plan that demonstrates the adequacy and...

  4. 10 CFR 72.184 - Safeguards contingency plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... contingency plan for responding to threats and radiological sabotage must be as defined in appendix C to part..., and Responsibility Matrix, the first four categories of information relating to nuclear facilities licensed under part 50 of this chapter. (The fifth and last category of information, Procedures, does not...

  5. 33 CFR 154.1125 - Additional response plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Prince William Sound, Alaska § 154.1125 Additional response plan requirements. (a) The owner or operator of a TAPAA facility shall include the following information in the Prince William Sound appendix to... for personnel, including local residents and fishermen, from the following locations in Prince William...

  6. 14 CFR Appendix D to Part 152 - Assurances

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... assurances that the sponsor or planning agency must submit with its application in accordance with §§ 152.111... airport planning grant shall submit the following assurance: The applicant hereby assures and certifies..., including, but not limited to charter flights, pilot training, aircraft rental and sightseeing, aerial...

  7. 14 CFR Appendix D to Part 152 - Assurances

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... assurances that the sponsor or planning agency must submit with its application in accordance with §§ 152.111... airport planning grant shall submit the following assurance: The applicant hereby assures and certifies..., including, but not limited to charter flights, pilot training, aircraft rental and sightseeing, aerial...

  8. 14 CFR Appendix D to Part 152 - Assurances

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... assurances that the sponsor or planning agency must submit with its application in accordance with §§ 152.111... airport planning grant shall submit the following assurance: The applicant hereby assures and certifies..., including, but not limited to charter flights, pilot training, aircraft rental and sightseeing, aerial...

  9. 14 CFR Appendix D to Part 152 - Assurances

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... assurances that the sponsor or planning agency must submit with its application in accordance with §§ 152.111... airport planning grant shall submit the following assurance: The applicant hereby assures and certifies..., including, but not limited to charter flights, pilot training, aircraft rental and sightseeing, aerial...

  10. 14 CFR Appendix D to Part 152 - Assurances

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... assurances that the sponsor or planning agency must submit with its application in accordance with §§ 152.111... airport planning grant shall submit the following assurance: The applicant hereby assures and certifies..., including, but not limited to charter flights, pilot training, aircraft rental and sightseeing, aerial...

  11. 10 CFR Appendix C to Part 73 - Nuclear Power Plant Safeguards Contingency Plans

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... Licensee's Organizational Structure for Contingency Responses—A delineation of the organization's chain of.... The following topics must be addressed: a. Organizational Structure. The safeguards contingency plan... individual, group, or organizational entity responsible for each decision and action. The goals of licensee...

  12. 78 FR 25299 - Notice of Intent To Prepare a Resource Management Plan for the San Pedro Riparian National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ... level. The process will follow the BLM's policies in Appendix C of the Land Use Planning Handbook, H..., sociology, and economics. Authority: 40 CFR 1501.7, 43 CFR 1610.2 Raymond Suazo, State Director. [FR Doc...

  13. 40 CFR 52.70 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Hearings, Written Testimony, etc. I-2 Recommendations for attainment/Nonattainment designations II-1 Alaska... for the Fairbanks Municipal Utilities System IV-3 Testing Procedures V-1 Air Quality Data An amended... Control Plan Amendment (which includes Appendix A the Alaska Statutes Title 46, Chapter 14, Article 3...

  14. Societal and Educational Projections, Appendix A. Vol. II, A Plan for Managing the Development, Implementation and Operation of a Model Elementary Teacher Education Program.

    ERIC Educational Resources Information Center

    Corley, Clifford L.; Koch, Norman E.

    The purpose of this paper is to identify and describe background information and possible indicators for future planning of elementary education, as a prerequisite to planning realistic education programs for early childhood and elementary school teachers. Developments considered include population growth, changing cultural characteristics,…

  15. 28 CFR Appendix E to Part 61 - United States Marshals Service Procedures Relating to the Implementation of the National...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... minimizing the use of natural resources, and by improving planning and decision-making processes to avoid...) Integrating the NEPA process in the early stages of planning to ensure that decisions reflect environmental... site. The exclusion applies only if: (i) The structure and proposed use comply with local planning and...

  16. 28 CFR Appendix E to Part 61 - United States Marshals Service Procedures Relating to the Implementation of the National...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... minimizing the use of natural resources, and by improving planning and decision-making processes to avoid...) Integrating the NEPA process in the early stages of planning to ensure that decisions reflect environmental... site. The exclusion applies only if: (i) The structure and proposed use comply with local planning and...

  17. 28 CFR Appendix E to Part 61 - United States Marshals Service Procedures Relating to the Implementation of the National...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... minimizing the use of natural resources, and by improving planning and decision-making processes to avoid...) Integrating the NEPA process in the early stages of planning to ensure that decisions reflect environmental... site. The exclusion applies only if: (i) The structure and proposed use comply with local planning and...

  18. 28 CFR Appendix E to Part 61 - United States Marshals Service Procedures Relating to the Implementation of the National...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... minimizing the use of natural resources, and by improving planning and decision-making processes to avoid...) Integrating the NEPA process in the early stages of planning to ensure that decisions reflect environmental... site. The exclusion applies only if: (i) The structure and proposed use comply with local planning and...

  19. American River Watershed Investigation, California. Volume 8. Appendix T

    DTIC Science & Technology

    1991-12-01

    American River in 1988. This model was developed for establishing new flood plain information for the Federal Emergency Management Agency for flood...PERTINENT CORRESPONDENCE B PLAN FORMULATION C ECONOMICS D WATER SUPPLY NEEDS E LAND USE Volume 2 F CULTURAL AND PALEONTOLOGICAL RESOURCES G SECTION 404...that the information provided in the Response to Comments Appendix will not be nearly as thorough as the discussions that are presented in the report

  20. Total Quality Management: Implications for Nursing Information Systems

    DTIC Science & Technology

    1992-01-01

    the Defense Department’s TQM model (see Appendix M) and TQM master plan (see Appendix N) (Hunt, 1992). Ishikawa . Kaoru Ishikawa was the best known of...the subject -- Deming, Juran, Crosby, Feigenbaum, Ishikawa , etc. (see Chapter 2). One of the most concise definitions on TQM was given in a speech by...with the contributions of key quality authors, including Deming, Juran, Crosby, Costello, and Ishikawa . The use of TQM in business and in healthcare

  1. 77 FR 70707 - Approval of Air Quality Implementation Plans; California; San Joaquin Valley and South Coast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0589 and EPA-R09-OAR-2011-0622... SIPs in the Code of Federal Regulations (CFR) at 40 CFR 52.220(c). See 77 FR 12652 (March 1, 2012) and... measures, as listed in Table B-1 on page 1 of Appendix B of the 2011 Progress Report and in Appendix A-3 of...

  2. Food Preference, Acceptance and Consumption in a Simulated, Isolated- Duty Station

    DTIC Science & Technology

    1977-05-01

    study food habits in a controlled isolation environment ,the fo6d choice and consumption behavior of the crew of a simulated, isolated-duty sta...Instructions for Consumption Diary 78 Appendix C: Food Items on Preference Survey List which were not on Menu 80 Appendix D: Item Name Changes Made to...U 1 SUMMARY The effectiveness of isolated duty stations depends on unusually careful planning to compensate for storage and logistical limitations

  3. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  4. 49 CFR 194.113 - Information summary.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Information summary. 194.113 Section 194.113... Response Plans § 194.113 Information summary. (a) The information summary for the core plan, required by... state(s). (b) The information summary for the response zone appendix, required in § 194.107, must...

  5. 44 CFR Appendix B to Part 62 - National Flood Insurance Program

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... obtain a copy of “The Write Your Own Program Financial Control Plan Requirements and Procedures” by... Plan to Maintain Financial Control for Business Written Under the Write Your Own Program. (a) In general. Under the Write Your Own (WYO) Program, we (the Federal Insurance Administration (FIA), Federal...

  6. 49 CFR Appendix B to Part 512 - General Class Determinations

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONFIDENTIAL BUSINESS INFORMATION Pt. 512, App. B... significant reverse engineering; (2) Future specific model plans (to be protected only until the date on which the specific model to which the plan pertains is first offered for sale); and (3) Future vehicle...

  7. 77 FR 16848 - Announcement of Funding Awards for the Neighborhood Stabilization Program (NSP) Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    ... Development. Appendix A Recipient State Amount APD Urban Planning Management, FL $500,000 LLC. Capital Access... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5499-FA-01] Announcement of Funding...) 2011 AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION...

  8. 40 CFR 52.1470 - Identification of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Highway 50 Corridor Study, June 1979 (Appendix C); (D) Reference from Transportation and Traffic... submitted on May 5, 1983 by the State: (i) “Stateline, Nevada, 1983 Carbon Monoxide Study”—a traffic... Implementation Plan, Post 1982 Update for Ozone adopted on October 16, 1984 (including section 33 (Chlorine in...

  9. 40 CFR 52.1470 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Highway 50 Corridor Study, June 1979 (Appendix C); (D) Reference from Transportation and Traffic... submitted on May 5, 1983 by the State: (i) “Stateline, Nevada, 1983 Carbon Monoxide Study”—a traffic... Implementation Plan, Post 1982 Update for Ozone adopted on October 16, 1984 (including section 33 (Chlorine in...

  10. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  11. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... figure 1 in appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  12. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  13. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  14. 75 FR 44932 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... recordkeeping requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Intent To Delete the... Act (CERCLA) of 1980, is an Appendix of the National Oil and Hazardous Substances Pollution...

  15. Predicting Software Assurance Using Quality and Reliability Measures

    DTIC Science & Technology

    2014-12-01

    errors are not found in unit testing . The rework effort to correct requirement and design problems in later phases can be as high as 300 to 1,000...Literature 31 Appendix B: Quality Cannot Be Tested In 35 Bibliography 38 CMU/SEI-2014-TN-026 | ii CMU/SEI-2014-TN-026 | iii List of Figures...Removal Densities During Development 10 Figure 8: Quality and Security-Focused Workflow 14 Figure 9: Testing Reliability Results for the Largest Project

  16. Responsiveness summary, bomarc missile site proposed plan. Final report, November 1989-May 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vest, G.

    1992-11-20

    A Public Meeting on the United States Air Force proposed plan for the clean-up of contamination at the BOMARC Missile Site, McGuire Air Force Base, New Jersey was conducted at Fort Dix, Now Jersey on June 20, 1992. A summary of responses to comments provided at the Public Meeting is provided. Responses to written comments are provided. A transcript of the public hearing is provided as Appendix A. A copy of all letters provided to the United States Air Force are provided as Appendix B. The BOMARC Missile Site became contaminated in 1960 as the result of a fire whichmore » partially consumed a nuclear warhead-equipped BOMARC missile.« less

  17. 14 CFR Appendix B to Part 415 - Safety Review Document Outline

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....0Flight Safety (§ 415.115) 4.1Initial Flight Safety Analysis 4.1.1Flight Safety Sub-Analyses, Methods, and... Analysis Data 4.2Radionuclide Data (where applicable) 4.3Flight Safety Plan 4.3.1Flight Safety Personnel 4... Safety (§ 415.117) 5.1Ground Safety Analysis Report 5.2Ground Safety Plan 6.0Launch Plans (§ 415.119 and...

  18. 14 CFR Appendix B to Part 415 - Safety Review Document Outline

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....0Flight Safety (§ 415.115) 4.1Initial Flight Safety Analysis 4.1.1Flight Safety Sub-Analyses, Methods, and... Analysis Data 4.2Radionuclide Data (where applicable) 4.3Flight Safety Plan 4.3.1Flight Safety Personnel 4... Safety (§ 415.117) 5.1Ground Safety Analysis Report 5.2Ground Safety Plan 6.0Launch Plans (§ 415.119 and...

  19. STS-61 mission director's post-mission report

    NASA Technical Reports Server (NTRS)

    Newman, Ronald L.

    1995-01-01

    To ensure the success of the complex Hubble Space Telescope servicing mission, STS-61, NASA established a number of independent review groups to assess management, design, planning, and preparation for the mission. One of the resulting recommendations for mission success was that an overall Mission Director be appointed to coordinate management activities of the Space Shuttle and Hubble programs and to consolidate results of the team reviews and expedite responses to recommendations. This report presents pre-mission events important to the experience base of mission management, with related Mission Director's recommendations following the event(s) to which they apply. All Mission Director's recommendations are presented collectively in an appendix. Other appendixes contain recommendations from the various review groups, including Payload Officers, the JSC Extravehicular Activity (EVA) Section, JSC EVA Management Office, JSC Crew and Thermal Systems Division, and the STS-61 crew itself. This report also lists mission events in chronological order and includes as an appendix a post-mission summary by the lead Payload Deployment and Retrieval System Officer. Recommendations range from those pertaining to specific component use or operating techniques to those for improved management, review, planning, and safety procedures.

  20. 40 CFR Table 6 to Subpart Dddd of... - Model Rule-Emission Limitations That Apply to Incinerators on and After [Date to be specified in...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... per million dry volume 3-run average (1 hour minimum sample time per run) Performance test (Method 10..., appendix A-3 or appendix A-8). Sulfur dioxide 11 parts per million dry volume 3-run average (1 hour minimum... Apply to Incinerators on and After [Date to be specified in state plan] a 6 Table 6 to Subpart DDDD of...

  1. 40 CFR Table 6 to Subpart Dddd of... - Model Rule-Emission Limitations That Apply to Incinerators on and After [Date to be specified in...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... per million dry volume 3-run average (1 hour minimum sample time per run) Performance test (Method 10..., appendix A-3 or appendix A-8). Sulfur dioxide 11 parts per million dry volume 3-run average (1 hour minimum... Apply to Incinerators on and After [Date to be specified in state plan] a 6 Table 6 to Subpart DDDD of...

  2. Mammography Screening Among African-American Women With a Family History of Breast Cancer

    DTIC Science & Technology

    1999-02-01

    Women into Mammography Stages of C hange ................................................................... Page 101-102 Appendix F: Poster Presentations...Agree 5. Strongly agree 7. Refused 8. Don’t know 2.8 Once you have a couple of mammograms that are normal, you dont need any more for a few years...mammogram is off schedule but is not thinking or planning to get another and has not scheduled an appointment. 102 Appendix F Poster Presentations and

  3. Skyline Wide Educational Plan (SWEP) Planning Project. Volume 2 -- Appendices. Combined Quarterly Report No. 4 (April 1 to June 30, 1974) and Final Report (July 1973 to August 1974).

    ERIC Educational Resources Information Center

    Dallas Independent School District, TX. Dept. of Research and Evaluation.

    This volume consists of a number of appendixes containing data and analyses that were compiled to aid administrators of the Skyline Wide Educational Plan (SWEP) in their efforts to develop a comprehensive secondary school plan for the Dallas-Fort Worth metroplex in the 1970's. Much of the volume is devoted to various facility considerations…

  4. Application of automatic vehicle location in law enforcement: An introductory planning guide

    NASA Technical Reports Server (NTRS)

    Hansen, G. R.; Leflang, W. G.

    1976-01-01

    A set of planning guidelines for the application of automatic vehicle location (AVL) to law enforcement is presented. Some essential characteristics and applications of AVL are outlined; systems in the operational or planning phases are discussed. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. A detailed description of a typical law enforcement AVL system, and a list of vendor sources are given in appendixes.

  5. 29 CFR Appendix to Subpart E of... - Exit Routes, Emergency Action Plans, and Fire Prevention Plans

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... selected to remain behind to care for essential plant operations until their evacuation becomes absolutely necessary. Essential plant operations may include the monitoring of plant power supplies, water supplies, and other essential services which cannot be shut down for every emergency alarm. Essential plant...

  6. 29 CFR Appendix to Subpart E of... - Exit Routes, Emergency Action Plans, and Fire Prevention Plans

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... selected to remain behind to care for essential plant operations until their evacuation becomes absolutely necessary. Essential plant operations may include the monitoring of plant power supplies, water supplies, and other essential services which cannot be shut down for every emergency alarm. Essential plant...

  7. 29 CFR Appendix to Subpart E of... - Exit Routes, Emergency Action Plans, and Fire Prevention Plans

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... selected to remain behind to care for essential plant operations until their evacuation becomes absolutely necessary. Essential plant operations may include the monitoring of plant power supplies, water supplies, and other essential services which cannot be shut down for every emergency alarm. Essential plant...

  8. 29 CFR Appendix to Subpart E of... - Exit Routes, Emergency Action Plans, and Fire Prevention Plans

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... selected to remain behind to care for essential plant operations until their evacuation becomes absolutely necessary. Essential plant operations may include the monitoring of plant power supplies, water supplies, and other essential services which cannot be shut down for every emergency alarm. Essential plant...

  9. 75 FR 20592 - Notice of Availability of Draft National Pollutant Discharge Elimination System (NPDES) General...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ... control is necessary based on wasteload allocations in the Lower Charles River Phosphorus TMDL (``the TMDL... management plan and a phosphorus reduction plan, as the mechanisms to achieve the required pollutant... Consistent with the wasteload allocation of the Lower Charles River Phosphorus TMDL, Part IV and Appendix D...

  10. 10 CFR Appendix D to Subpart D of... - Classes of Actions that Normally Require EISs

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... [Reserved] D7 Contracts, policies, and marketing and allocation plans for electric power D8 Import or export... operational change D10 Treatment, storage, and disposal facilities for high-level waste and spent nuclear fuel... Contracts, Policies, and Marketing and Allocation Plans for Electric Power Establishment and implementation...

  11. 32 CFR Appendix D to Part 651 - Public Participation Plan

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... involvement is a requisite element of the scoping process (40 CFR 1501.7(a)(1)). (6) Preparation of EAs will... of the preparation of environmental analyses and the tentative planning and decision-making schedule... responsible for matters related to the scoping process. If they are not the same as the proponent of the...

  12. Applying Technology to Unmet Needs. Technology and the American Economy, Appendix, Volume V.

    ERIC Educational Resources Information Center

    National Commission on Technology, Automation and Economic Progress, Washington, DC.

    Twelve studies dealing with the problems of applying technology to unmet human and community needs are presented. "Urban Planning and Metropolitan Development--The Role of Technology," examines the possibilities of the computer and other modern planning tools. "Technology, Automation, and Economic Progress in Housing and Urban Development"…

  13. 14 CFR Appendix G to Part 91 - Operations in Reduced Vertical Separation Minimum (RVSM) Airspace

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... flight planned route through the appropriate flight planning information sources. (b) No person may show..., DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT..., air traffic control (ATC) separates aircraft by a minimum of 1,000 feet vertically between flight...

  14. 14 CFR Appendix G to Part 91 - Operations in Reduced Vertical Separation Minimum (RVSM) Airspace

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... flight planned route through the appropriate flight planning information sources. (b) No person may show..., DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT..., air traffic control (ATC) separates aircraft by a minimum of 1,000 feet vertically between flight...

  15. 14 CFR Appendix G to Part 91 - Operations in Reduced Vertical Separation Minimum (RVSM) Airspace

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... flight planned route through the appropriate flight planning information sources. (b) No person may show..., DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT..., air traffic control (ATC) separates aircraft by a minimum of 1,000 feet vertically between flight...

  16. 14 CFR Appendix G to Part 91 - Operations in Reduced Vertical Separation Minimum (RVSM) Airspace

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... flight planned route through the appropriate flight planning information sources. (b) No person may show..., DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT..., air traffic control (ATC) separates aircraft by a minimum of 1,000 feet vertically between flight...

  17. 14 CFR Appendix G to Part 91 - Operations in Reduced Vertical Separation Minimum (RVSM) Airspace

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... flight planned route through the appropriate flight planning information sources. (b) No person may show..., DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT..., air traffic control (ATC) separates aircraft by a minimum of 1,000 feet vertically between flight...

  18. 40 CFR Appendix F to Part 112 - Facility-Specific Response Plan

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Prevention, Control, and Countermeasures (SPCC) Plan as required by 40 CFR 112.3. In these cases, owners or... sections for the non-transportation-related and transportation-related components, as described in § 112.20... of measure Response Action Actions Taken to Correct, Control or Mitigate Incident: Impact Number of...

  19. 40 CFR Appendix F to Part 112 - Facility-Specific Response Plan

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Prevention, Control, and Countermeasures (SPCC) Plan as required by 40 CFR 112.3. In these cases, owners or... sections for the non-transportation-related and transportation-related components, as described in § 112.20... of measure Response Action Actions Taken to Correct, Control or Mitigate Incident: Impact Number of...

  20. 75 FR 34626 - Rules and Regulations for Abandoned Individual Account Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 29 CFR Part 2578 Rules and Regulations for Abandoned Individual Account Plans CFR Correction In Title 29 of the Code of Federal Regulations, Part 1927 to End, revised as of July 1, 2009, on pages 664 and 665, remove the second Appendix C...

  1. 76 FR 31884 - Reducing Regulatory Burden; Retrospective Review Plans Under E.O. 13563

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-02

    ... agencies have been posted on the White House Web site at: http://www.slideshare.net/whitehouse/hud-combined... effective and less burdensome in achieving HUD's mission to create strong, sustainable, inclusive... House Web site at: http://www.slideshare.net/whitehouse/hud-combined . The appendix to HUD's plan...

  2. On Measuring Economic Attitudes.

    ERIC Educational Resources Information Center

    Soper, John C.; Walstad, William B.

    1983-01-01

    The Survey on Economic Attitudes (SEA), which consists of two affective domain instruments for measuring student attitudes toward economics and their relative economic attitude sophistication, was found to be valid and reliable. Uses and limitations of the SEA are also discussed. The survey is included in the article's appendix. (Author/RM)

  3. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, A. J.

    2014-03-03

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence withmore » the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.« less

  4. Corps Helicopter Attack Planning System (CHAPS). Positional Handbook. Appendix A. Messages. Appendix B. Statespace Construction Sample Session

    DTIC Science & Technology

    1989-10-01

    REVIEW MENU PROGRAM (S) CHAPS PURPOSE AND OVERVIEV The Do Review menu allows the user to select which missions to perform detailed analysis on and...input files must be resident on the computer you are running SUPR on. Any interface or file transfer programs must be successfully executed prior to... COMPUTER PROGRAM WAS DEVELOPED BY SYSTEMS CONTROL TECHNOLOGY FOR THE DEPUTY CHIEF OF STAFF/OPERATIONS,HQ USAFE. THE USE OF THE COMPUTER PROGRAM IS

  5. Proceedings of the Joint Logistics Commanders Joint Policy Coordinating Group on Computer Resource Management; Computer Software Management Software Workshop, 2-5 April 1979.

    DTIC Science & Technology

    1979-08-21

    Appendix s - Outline and Draft Material for Proposed Triservice Interim Guideline on Application of Software Acceptance Criteria....... 269 Appendix 9...AND DRAFT MATERIAL FOR PROPOSED TRISERVICE INTERIM GUIDELINE ON APPLICATION OF SOFTWARE ACCEPTANCE CRITERIA I I INTRODUCTION The purpose of this guide...contract item (CPCI) (code) 5. CPCI test plan 6. CPCI test procedures 7. CPCI test report 8. Handbooks and manuals. Al though additional material does

  6. Review of the Increased Participation of the Commanders-in-Chief (CINCS) in the Planning, Programing, and Budgeting System (PPBS)

    DTIC Science & Technology

    1988-06-01

    NOVEMBER 1984, SUBJECT: ENHANCEMENT OF THE CINCS ROLE IN PPBS......152 APPENDIX C: EXTRACTS FROM THE GOLDWATER-NICHOLS ACT RELATING TO THE CINCS...18 The law refers to combatant commands and later combatant commanders who are more commonly referred to as CINCs or Commanders-in-Chief. 19 Boldin ...Appendix D for extracts from the Goldwater-Nichols Act .-- and other documents relating to the CINCs.) For the first time, and because of the Act

  7. Computer Operations Study of Reservoir Operations for Six Mississippi River Headwaters Dams. Appendix A.

    DTIC Science & Technology

    1982-06-01

    p*A C.._ _ __ _ _ A, d.tibutiou is unhimta 4 iit 84~ L0 TABLE OF CONTENTS APPENDIX SCOPE OF WORK B MERGE AND COST PROGRAM DOCUMENTATION C FATSCO... PROGRAM TO COMPUTE TIME SERIES FREQUENCY RELATIONSHIPS D HEC-DSS - TIME SERIES DATA FILE MANAGEMENT SYSTEM E PLAN 1 -TIM SERIES DATA PLOTS AND ANNUAL...University of Minnesota, utilized an early version of the Hydrologic Engineering * Center’s (HEC) EEC-5c Computer Program . EEC is a Corps of Engineers

  8. Preliminary design of a solar central receiver for a site-specific repowering application (Saguaro Power Plant). Volume IV. Appendixes. Final report, October 1982-September 1983

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weber, E.R.

    1983-09-01

    The appendixes for the Saguaro Power Plant includes the following: receiver configuration selection report; cooperating modes and transitions; failure modes analysis; control system analysis; computer codes and simulation models; procurement package scope descriptions; responsibility matrix; solar system flow diagram component purpose list; thermal storage component and system test plans; solar steam generator tube-to-tubesheet weld analysis; pipeline listing; management control schedule; and system list and definitions.

  9. NASA's Microgravity Technology Report, 1996: Summary of Activities

    NASA Technical Reports Server (NTRS)

    Kierk, Isabella

    1996-01-01

    This report covers technology development and technology transfer activities within the Microgravity Science Research Programs during FY 1996. It also describes the recent major tasks under the Advanced Technology Development (ATD) Program and identifies current technology requirements. This document is consistent with NASA,s Enteprise for the Human Exploration and development of Space (HEDS) Strategic Plan. This annual update reflects changes in the Microgravity Science Research Program's new technology activities and requirements. Appendix A. FY 1996 Advanced Technology Development. Program and Project Descriptions. Appendix B. Technology Development.

  10. Trade study plan for Reusable Hydrogen Composite Tank System (RHCTS)

    NASA Astrophysics Data System (ADS)

    Greenberg, H. S.

    1994-07-01

    This TA 1 document describes the trade study plan (with support from TA 2) that will identify the most suitable structural configuration for an SSTO winged vehicle capable of delivering 25,000 lbs to a 220 nm circular orbit at 51.6 degree inclination. The analysis uses information derived in the TA 2 study as identified within the study plan. In view of this, for convenience, the TA 2 study plan is included as an appendix to this document.

  11. Application of computer-aided dispatch in law enforcement: An introductory planning guide

    NASA Technical Reports Server (NTRS)

    Sohn, R. L.; Gurfield, R. M.; Garcia, E. A.; Fielding, J. E.

    1975-01-01

    A set of planning guidelines for the application of computer-aided dispatching (CAD) to law enforcement is presented. Some essential characteristics and applications of CAD are outlined; the results of a survey of systems in the operational or planning phases are summarized. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Detailed descriptions of typical law enforcement CAD systems, and a list of vendor sources, are given in appendixes.

  12. Trade study plan for Reusable Hydrogen Composite Tank System (RHCTS)

    NASA Technical Reports Server (NTRS)

    Greenberg, H. S.

    1994-01-01

    This TA 1 document describes the trade study plan (with support from TA 2) that will identify the most suitable structural configuration for an SSTO winged vehicle capable of delivering 25,000 lbs to a 220 nm circular orbit at 51.6 degree inclination. The analysis uses information derived in the TA 2 study as identified within the study plan. In view of this, for convenience, the TA 2 study plan is included as an appendix to this document.

  13. EOS Laser Atmosphere Wind Sounder (LAWS) investigation

    NASA Technical Reports Server (NTRS)

    Emmitt, George D.

    1991-01-01

    The related activities of the contract are outlined for the first year. These include: (1) attend team member meetings; (2) support EOS Project with science related activities; (3) prepare and Execution Phase plan; and (4) support LAWS and EOSDIS related work. Attached to the report is an appendix, 'LAWS Algorithm Development and Evaluation Laboratory (LADEL)'. Also attached is a copy of a proposal to the NASA EOS for 'LAWS Sampling Strategies and Wind Computation Algorithms -- Storm-Top Divergence Studies. Volume I: Investigation and Technical Plan, Data Plan, Computer Facilities Plan, Management Plan.'

  14. 77 FR 53884 - Automatic Underfrequency Load Shedding and Load Shedding Plans Reliability Standards; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ... Underfrequency Load Shedding and Load Shedding Plans Reliability Standards; Notice of Compliance Filing Take notice that on August 9, 2012, North American Electric Reliability Corporation submitted a compliance... Load Shedding Plans Reliability Standards, 139 FERC ] 61,098, (Order No. 763) (2012). Any person...

  15. Project Quality Assurance Plan for research and development services provided by Oak Ridge National Laboratory in support of the Westinghouse Materials Company of Ohio Operable Unit 1 Stabilization Development and Treatability Studies Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gilliam, T.M.

    1991-05-01

    This Project Quality Assurance Plan (PQAP) sets forth the quality assurance (QA) requirements that are applied to those elements of the Westinghouse Materials Company of Ohio (WMCO) Operable Unit 1 support at Oak Ridge National Laboratory (ORNL) project that involve research and development (R D) performed at ORNL. This is in compliance with the applicable criteria of 10 CFR Part 50, Appendix B, ANSI/ASME NQA-1, as specified by Department of Energy (DOE) Oak Ridge Operations (ORO) Order 5700.6B. For this application, NQA-1 is the core QA Program requirements document. QA policy, normally found in the requirements document, is contained herein.more » The requirements of this PQAP apply to project activities that affect the quality and reliability/credibility of research, development, and investigative data and documentation. These activities include the functions of attaining quality objectives and assuring that an appropriate QA program scope is established. The scope of activities affecting quality includes organization; personnel training and qualifications; design control; procurement; material handling and storage; operating procedures; testing, surveillance, and auditing; R D investigative activities and documentation; deficiencies; corrective actions; and QA record keeping. 12 figs.« less

  16. 12 CFR Appendix M1 to Part 226 - Repayment Disclosures

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... a fixed period of time, as set forth by the card issuer. (2) “Deferred interest or similar plan... calculating the minimum payment repayment estimate, card issuers must use the minimum payment formula(s) that... purchases, such as a “club plan purchase.” Also, assume that based on a consumer's balances in these...

  17. 12 CFR Appendix M1 to Part 226 - Repayment Disclosures

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... of time, as set forth by the card issuer. (2) “Deferred interest or similar plan” means a plan where... payment repayment estimate, card issuers must use the minimum payment formula(s) that apply to a..., such as a “club plan purchase.” Also, assume that based on a consumer's balances in these features and...

  18. 12 CFR Appendix M1 to Part 226 - Repayment Disclosures

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... of time, as set forth by the card issuer. (2) “Deferred interest or similar plan” means a plan where... payment repayment estimate, card issuers must use the minimum payment formula(s) that apply to a..., such as a “club plan purchase.” Also, assume that based on a consumer's balances in these features and...

  19. 12 CFR Appendix M1 to Part 226 - Repayment Disclosures

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... a fixed period of time, as set forth by the card issuer. (2) “Deferred interest or similar plan... calculating the minimum payment repayment estimate, card issuers must use the minimum payment formula(s) that... purchases, such as a “club plan purchase.” Also, assume that based on a consumer's balances in these...

  20. 76 FR 1197 - Detroit Edison Company, FERMI 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-07

    ... ensure that ERO personnel are familiar with their duties and to test the adequacy of emergency plans. In... having a role under the plan. The underlying purposes of 10 CFR part 50, Appendix E, Section IV.F.2.b requiring licensees to conduct a biennial EP exercise is to ensure that ERO personnel are familiar with...

  1. 33 CFR Appendix B to Part 263 - Application of Multiobjective Planning Framework to Continuing Authorities Program

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Authorities Program 1. General. The planning process described in the ER 1105-2-200 series of regulations... at the same time keeping the requirements for information and analyses consistent with the scope of the study, solutions recommended, and the Program completion-time objectives outlined in § 263.18 of...

  2. 33 CFR Appendix B to Part 263 - Application of Multiobjective Planning Framework to Continuing Authorities Program

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Authorities Program 1. General. The planning process described in the ER 1105-2-200 series of regulations... at the same time keeping the requirements for information and analyses consistent with the scope of the study, solutions recommended, and the Program completion-time objectives outlined in § 263.18 of...

  3. 33 CFR Appendix B to Part 263 - Application of Multiobjective Planning Framework to Continuing Authorities Program

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Authorities Program 1. General. The planning process described in the ER 1105-2-200 series of regulations... at the same time keeping the requirements for information and analyses consistent with the scope of the study, solutions recommended, and the Program completion-time objectives outlined in § 263.18 of...

  4. 33 CFR Appendix B to Part 263 - Application of Multiobjective Planning Framework to Continuing Authorities Program

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Authorities Program 1. General. The planning process described in the ER 1105-2-200 series of regulations... at the same time keeping the requirements for information and analyses consistent with the scope of the study, solutions recommended, and the Program completion-time objectives outlined in § 263.18 of...

  5. 33 CFR Appendix B to Part 263 - Application of Multiobjective Planning Framework to Continuing Authorities Program

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Authorities Program 1. General. The planning process described in the ER 1105-2-200 series of regulations... at the same time keeping the requirements for information and analyses consistent with the scope of the study, solutions recommended, and the Program completion-time objectives outlined in § 263.18 of...

  6. 76 FR 22720 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2011-N073;10120-1113-0000-C2] Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern Spotted Owl--Appendix C AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of document availability; reopening...

  7. 41 CFR Appendix E to Chapter 301 - Suggested Guidance for Conference Planning

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... agency seal and conference logo. • Handicapped requirements. • Planning of meals and refreshments, if... generally best to estimate on the low side for the number of sleeping rooms and meals to be prepared... sleeping rooms and meals; however, they discourage—and in some cases penalize—you if the sleeping room and...

  8. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...

  9. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...

  10. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...

  11. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...

  12. 76 FR 18869 - Allocation of Assets in Single-Employer Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-06

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4044 Allocation of Assets in Single-Employer Plans CFR Correction In Title 29 of the Code of Federal Regulations, Part 1927 to End, revised as of July 1, 2010, on page 1007, in the table in Appendix B, in the entry for July 1994, the fourth column...

  13. 44 CFR Appendix A to Part 353 - Memorandum of Understanding Between Federal Emergency Management Agency and Nuclear Regulatory...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Commission on the Accident at Three Mile Island, directed that FEMA assume lead responsibility for all... can degrade the capabilities of offsite response organizations in the 10-mile plume emergency planning... affected offsite jurisdictions located in the 10-mile emergency planning zone and is not intended to be a...

  14. 44 CFR Appendix A to Part 353 - Memorandum of Understanding Between Federal Emergency Management Agency and Nuclear Regulatory...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Commission on the Accident at Three Mile Island, directed that FEMA assume lead responsibility for all... can degrade the capabilities of offsite response organizations in the 10-mile plume emergency planning... affected offsite jurisdictions located in the 10-mile emergency planning zone and is not intended to be a...

  15. 76 FR 69172 - Determination of Governmental Plan Status

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ...The Treasury Department and IRS anticipate issuing regulations under section 414(d) of the Internal Revenue Code (Code) to define the term ``governmental plan.'' This document describes the rules that the Treasury Department and IRS are considering proposing relating to the determination of whether a plan is a governmental plan within the meaning of section 414(d) and contains an appendix that includes a draft notice of proposed rulemaking on which the Treasury Department and IRS invite comments from the public. This document applies to sponsors of, and participants and beneficiaries in, employee benefit plans that are determined to be governmental plans.

  16. Command and Control Element, (C2E), ILS Concept Plan

    DTIC Science & Technology

    1992-05-01

    1824. ROBERT F. PHELPS LtCol, USAF Acting Director, BMC3 Attachment Distribution SDIO/SDA SDIO/TD SDIO/ SDG SDIO/SDN SDIO/SDT SDIO/TIC OJCS...3 5 APPENDIX A-PLANNING BY LOGISTICS FUNCTIONAL AREAS A -1 1.0 Maintenance Planning A-2 2.0 Supply Support A-1 0 3.0 Technical...Functional communities and establishments - experts and specialists in fields such as training, maintenance, supply , engineering, computer programming and

  17. A Study to Determine the Validity of the Nursing Admission Assessment (DA Form 3888/3888-1) as a Mechanism for Identifying the Presence of One or More Universal Indicators of the Need for Discharge Planning

    DTIC Science & Technology

    1987-08-01

    in the hope that Army hospitals could begin to develop discharge planning programs in advance of the publica- tion of the proposed JCAH standard (see... Ostomy patients 24. Coronary bypass patients 11 BAMC Memo 40-25 94 APPENDIX C Discharge Planning Screen for Drug-Nutrient Interactions JCAH requires

  18. EARTHSAWtm IN-SITU CONTAINMENT OF PITS AND TRENCHES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ernest E. Carter, P.E.

    2002-09-20

    EarthSaw{trademark} is a proposed technology for construction of uniform high quality barriers under and around pits and trenches containing buried radioactive waste without excavating or disturbing the waste. The method works by digging a deep vertical trench around the perimeter of a site, filling that trench with high specific gravity grout sealant, and then cutting a horizontal bottom pathway at the base of the trench with a simple cable saw mechanism. The severed block of earth becomes buoyant in the grout and floats on a thick layer of grout, which then cures into an impermeable barrier. The ''Interim Report onmore » task 1 and 2'' which is incorporated into this report as appendix A, provided theoretical derivations, field validation of formulas, a detailed quantitative engineering description of the technique, engineering drawings of the hardware, and a computer model of how the process would perform in a wide variety of soil conditions common to DOE waste burial sites. The accomplishments of task 1 and 2 are also summarized herein Task 3 work product provides a comprehensive field test plan in Appendix B and a health and safety plan in Appendix C and proposal for a field-scale demonstration of the EarthSaw barrier technology. The final report on the subcontracted stress analysis is provided in Appendix D. A copy of the unified computer model is provided as individual non-functional images of each sheet of the spreadsheet and separately as a Microsoft Excel 2000 file.« less

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sarmiento, Jorge L.; Chavez, Francisco; Maltrud, Matthew

    The purpose of this proposal was to fund a workshop to bring together the principal investigators of all the projects that were being funded under the DOE ocean carbon sequestration research program. The primary goal of the workshop was to interchange research results, to discuss ongoing research, and to identify future research priorities. In addition, we hoped to encourage the development of synergies and collaborations between the projects and to write an EOS article summarizing the results of the meeting. Appendix A summarizes the plan of the workshop as originally proposed, Appendix B lists all the principal investigators who weremore » able to attend the workshop, Appendix C shows the meeting agenda, and Appendix D lists all the abstracts that were provided prior to the meeting. The primary outcome of the meeting was a decision to write two papers for the reviewed literature on carbon sequestration by iron fertilization, and on carbon sequestration by deep sea injection and to examine the possibility of an overview article in EOS on the topic of ocean carbon sequestration.« less

  20. Metropolitan area transportation planning for healthy communities

    DOT National Transportation Integrated Search

    1997-09-26

    Appendix D of the "Implementation of the National Intelligent Transportation Systems Program", a report forwarded to Congress according to Section 6054(c) of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA).

  1. Static noise tests on augmentor wing jet STOL research aircraft (C8A Buffalo)

    NASA Technical Reports Server (NTRS)

    Marrs, C. C.; Harkonen, D. L.; Okeefe, J. V.

    1974-01-01

    Results are presented for full scale ground static acoustic tests of over-area conical nozzles and a lobe nozzle installed on the Augmentor Wing Jet STOL Research Aircraft, a modified C8A Buffalo. The noise levels and spectrums of the test nozzles are compared against those of the standard conical nozzle now in use on the aircraft. Acoustic evaluations at 152 m (500 ft), 304 m (1000 ft), and 1216 m (4000 ft) are made at various engine power settings with the emphasis on approach and takeoff power. Appendix A contains the test log and propulsion calculations. Appendix B gives the original test plan, which was closely adhered to during the test. Appendix C describes the acoustic data recording and reduction systems, with calibration details.

  2. RMP Guidance for Chemical Distributors - Appendix A: 40 CFR part 68/Selected NAICS Codes

    EPA Pesticide Factsheets

    The full text of Part 68, Chemical Accident Prevention provisions, includes hazard assessment, emergency response, threshold quantities for regulated substances, reporting requirements, and the Risk Management Plan.

  3. 33 CFR 155.1110 - Purpose and applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... under the Trans-Alaska Pipeline Authorization Act (TAPAA) (43 U.S.C. 1651 et seq.) in Prince William... included in a Prince William Sound geographic-specific appendix to the vessel response plan required by...

  4. Actions That Could Reduce Water Temperature

    EPA Pesticide Factsheets

    Appendix F from Being Prepared for Climate Change: A Workbook for Developing Risk-Based Adaptation Plans, lists actions that could lower water temperture, and notes their cobenefits for urban stormwater control or restoring watersheds.

  5. 2 CFR Appendix D to Part 225 - Public Assistance Cost Allocation Plans

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...), Medicaid, Food Stamps, Child Support Enforcement, Adoption Assistance and Foster Care, and Social Services... funding agencies, single audits, or audits conducted by the cognizant audit agency. 2. Where inappropriate...

  6. Evaluation of Quantitative Environmental Stress Screening (ESS) Methods. Volume 1

    DTIC Science & Technology

    1991-11-01

    required information on screening strength from the curvefitting parameters. The underlying theory and approach taken are discussed in Appendix A. To...in field 1020 arm St.,Vas AJ Ptr 0.4i Currpnt. c- ugt ~ing DU?/SYS 2.7264 Wll/IY.3 at Factory Stress- NaxiLMw outgoing W?is’ys 0.288 DrW/5?S at Field...182 125 K.W.Fertig and V.X. Murthy, Models for Reliability Growth During Burn-in: Theory and Applicat’ons,Proceedings 1978 Annual Reliability and

  7. The U.S. Navy Submarine Hydrodynamics/ Hydroacoustic Community: A Case Study in Strategic Planning for a Decentralized, Multi-Organizational, Military Community

    DTIC Science & Technology

    2004-12-01

    developed by John Bryson and Farnum K. Alston105 to facilitate this SWOT analysis and other strategic planning efforts with the Hydro Sub Group ...described in the previous chapter. Meetings with the Hydro Sub Group resulted in a SWOT analysis and a decision to identify the overarching strategic...113 APPENDIX A – RESULTS OF INITIAL PLANNING MEETINGS WITH THE HYDRO SUB GROUP – MARCH 2002

  8. EDI Planning and Implementation Guide.

    DTIC Science & Technology

    1992-06-01

    mentation Guide is designed to both assist DoD activities in the preparation of EDI business plans and to educate DoD personnel on EDI matters. Strategic...business trans- actions be transmitted using EDI by the fourth quarter of FY96. Structure of the Guide The figure below shows how each chapter and appendix...in the Guide relate to each other and their roles in the development of business plans and the education of DoD personnel. Chapters 1, 5, and the

  9. Metropolitan Washington Area Water Supply Study. Appendix H. Bloomington Lake Reformulation Study. Volume 1.

    DTIC Science & Technology

    1983-09-01

    Profile H-16 North Branch Potomac River H-16 Location H-16 Land Use H-16 Socio -Economic Characteristics H-I8 Archaeological and Historic Resources H- 19...pasture land. Socio - Economic Characteristics In general, the socio -economic characteristics of the North Branch Potomac River Basin are similar to...the formulation of alternative plans and to enable an evaluation of plan effectiveness. Planning objectives may sometimes conflict with each other

  10. 49 CFR Appendix A to Part 99 - Categories of Financial Interests Exempted From the Prohibitions of Section 208(a) of Title 18...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., health, or accident insurance plan or other employee welfare or benefit plan that is maintained by a... Transportation Office of the Secretary of Transportation EMPLOYEE RESPONSIBILITIES AND CONDUCT Pt. 99, App. A... States Code, because they are too remote or too inconsequential to affect the integrity of an employee's...

  11. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 489: WWII UXO Sites, Tonopah Test Range, Nevada; May 2005

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Nevada; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2005-05-01

    This Streamlined Approach for Environmental Restoration Plan provides the details for the closure of Corrective Action Unit (CAU) 489: WWII UXO Sites, Tonopah Test Range. CAU 489 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996.

  12. 2 CFR Appendix C to Part 225 - State/Local-Wide Central Service Cost Allocation Plans

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Requirements. 1. Each State will submit a plan to the Department of Health and Human Services for each year in... certain additional information is needed, and will likely be needed in future years, it may be routinely.... (1) For each internal service fund or similar activity with an operating budget of $5 million or more...

  13. 2 CFR Appendix C to Part 225 - State/Local-Wide Central Service Cost Allocation Plans

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Requirements. 1. Each State will submit a plan to the Department of Health and Human Services for each year in... certain additional information is needed, and will likely be needed in future years, it may be routinely.... (1) For each internal service fund or similar activity with an operating budget of $5 million or more...

  14. 2 CFR Appendix C to Part 225 - State/Local-Wide Central Service Cost Allocation Plans

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Requirements. 1. Each State will submit a plan to the Department of Health and Human Services for each year in... certain additional information is needed, and will likely be needed in future years, it may be routinely.... (1) For each internal service fund or similar activity with an operating budget of $5 million or more...

  15. 40 CFR Appendix A to Subpart S of... - Interpretive Ruling for § 85.1803-Remedial Plans

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...—Remedial Plans The purpose of this rule is to set forth EPA's interpretation regarding one aspect of a... Clean Air Act, 42 U.S.C. 7641(c)(1). This rule will provide guidance to vehicle and engine manufacturers... conform to the regulations prescribed under section 202 when in actual use throughout their useful lives...

  16. 32 CFR Appendix H to Part 154 - Adjudicative Guidelines for Determining Eligibility for Access to Classified Information

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... educational, medical, retirement, social welfare, or other such benefits from a foreign country; (4) Residence... recur and does not cast doubt on the individual's current reliability, trustworthiness, or good judgment..., good-faith efforts to correct the omission, concealment, or falsification before being confronted with...

  17. 32 CFR Appendix H to Part 154 - Adjudicative Guidelines for Determining Eligibility for Access to Classified Information

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... educational, medical, retirement, social welfare, or other such benefits from a foreign country; (4) Residence... recur and does not cast doubt on the individual's current reliability, trustworthiness, or good judgment..., good-faith efforts to correct the omission, concealment, or falsification before being confronted with...

  18. 32 CFR Appendix H to Part 154 - Adjudicative Guidelines for Determining Eligibility for Access to Classified Information

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... educational, medical, retirement, social welfare, or other such benefits from a foreign country; (4) Residence... recur and does not cast doubt on the individual's current reliability, trustworthiness, or good judgment..., good-faith efforts to correct the omission, concealment, or falsification before being confronted with...

  19. 32 CFR Appendix H to Part 154 - Adjudicative Guidelines for Determining Eligibility for Access to Classified Information

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... educational, medical, retirement, social welfare, or other such benefits from a foreign country; (4) Residence... recur and does not cast doubt on the individual's current reliability, trustworthiness, or good judgment..., good-faith efforts to correct the omission, concealment, or falsification before being confronted with...

  20. 32 CFR Appendix H to Part 154 - Adjudicative Guidelines for Determining Eligibility for Access to Classified Information

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... educational, medical, retirement, social welfare, or other such benefits from a foreign country; (4) Residence... recur and does not cast doubt on the individual's current reliability, trustworthiness, or good judgment..., good-faith efforts to correct the omission, concealment, or falsification before being confronted with...

  1. Forest resources of Louisiana

    Treesearch

    James F. Rosson; William H. McWilliams; Paul D. Frey

    1988-01-01

    This report documents the findings of the fifth forest survey of Louisiana. Trend data on the forest resource are presented along with appropriate tables and figures. The appendix contains definitions of terms, a discussion of data reliability, a tree species list, and 22 standard statistical tables. Data are reported for January 1, 1984. Major highlights are listed...

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ortiz de Montellano, B.

    As planned a letter was sent out to 17 teachers who had participated in a Summer 1994 workshop on ``Culturally Relevant Science for Hispanics`` at Michigan State. These teachers were supposed to have spent the intervening time developing lesson plans and curricula. The letter requested a report of any activities undertaken and copies of lesson plans and materials developed by February 1996 with a stipend of $400 for satisfactory reports. It was a disappointment to only get 9 responses and not all of them demonstrating a satisfactory level of activity. Diana Marinez, Dean of Science at Texas A and Mmore » University, Corpus Christi, who is the other developer of this curriculum and the author reviewed the submitted materials and chose those showing the most promise to be invited to participate in the Summer Writing Workshop. Spring of 1996 and particularly in May--June, the author wrote a partial first draft of a companion volume for the teacher`s manual which would provide a rationale for doing culturally relevant science, present the cultural and the scientific background that teachers would need in order to be able to teach. One of the goals of this curriculum is that it should be off-the-shelf ready to teach and that teachers would not have to do extra research to encourage its adoption. The outline of the book is appendix 1. The Writing Workshop was held at Texas A and M University, Corpus Christi from July 14 to July 27, 1996. Participating teachers chose topics that they were interested in developing and wrote first drafts. These were distributed to all participants and critiqued by the workshop directors before being rewritten. Some teachers were more productive than others depending on their science background. In total an impressive number of lesson plans were written. These lesson plans are listed in Appendix 3. Appendix 4 is a sample lesson. Work still needs to be done on both the source book and the teachers` manual.« less

  3. Reliability and Maintainability (RAM) Training

    NASA Technical Reports Server (NTRS)

    Lalli, Vincent R. (Editor); Malec, Henry A. (Editor); Packard, Michael H. (Editor)

    2000-01-01

    The theme of this manual is failure physics-the study of how products, hardware, software, and systems fail and what can be done about it. The intent is to impart useful information, to extend the limits of production capability, and to assist in achieving low-cost reliable products. In a broader sense the manual should do more. It should underscore the urgent need CI for mature attitudes toward reliability. Five of the chapters were originally presented as a classroom course to over 1000 Martin Marietta engineers and technicians. Another four chapters and three appendixes have been added, We begin with a view of reliability from the years 1940 to 2000. Chapter 2 starts the training material with a review of mathematics and a description of what elements contribute to product failures. The remaining chapters elucidate basic reliability theory and the disciplines that allow us to control and eliminate failures.

  4. Construction Monitoring of Soft Ground Rapid Transit Tunnels : Volume 2. Appendixes.

    DOT National Transportation Integrated Search

    1974-11-01

    The Urban Mass Transportation Administration (UMTA) Tunneling Program Concentrates its efforts on reducing tunneling costs, minimizing environmental impact and enhancing safety as it applies to the planning, organization, design, construction and mai...

  5. General RMP Guidance - Appendix A: 40 CFR 68

    EPA Pesticide Factsheets

    Here the full text of Chemical Accident Prevention Provisions and Risk Management Program is transcribed directly from the Code of Federal Regulations. Subparts include hazard assessment, regulated substances and thresholds, and risk management plan.

  6. Corridor Planning And Feasibility Analysis, Early Action Projects Appendix

    DOT National Transportation Integrated Search

    1994-05-01

    STUDY OBJECTIVE. BECAUSE OF THE PHYSICAL, ENVIRONMENTAL, AND TRAVEL CHARACTERISTICS OF I-70 FROM DENVER TO GLENWOOD SPRINGS, THE COLORADO DEPARTMENT OF TRANSPORTATION (CDOT) IDENTIFIED IT AS A PRIME CORRIDOR FOR IMPLEMENTING INTELLIGENT TRANSPORTATIO...

  7. 40 CFR Appendix I to Part 310 - Frequently Asked Questions

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS REIMBURSEMENT TO LOCAL GOVERNMENTS FOR EMERGENCY... incur significant costs trying to recover from the PRP, can I be reimbursed by EPA for those costs? No...

  8. 40 CFR Appendix I to Part 310 - Frequently Asked Questions

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS REIMBURSEMENT TO LOCAL GOVERNMENTS FOR EMERGENCY... incur significant costs trying to recover from the PRP, can I be reimbursed by EPA for those costs? No...

  9. 40 CFR Appendix I to Part 310 - Frequently Asked Questions

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS REIMBURSEMENT TO LOCAL GOVERNMENTS FOR EMERGENCY... incur significant costs trying to recover from the PRP, can I be reimbursed by EPA for those costs? No...

  10. 40 CFR Appendix I to Part 310 - Frequently Asked Questions

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS REIMBURSEMENT TO LOCAL GOVERNMENTS FOR EMERGENCY... incur significant costs trying to recover from the PRP, can I be reimbursed by EPA for those costs? No...

  11. 12 CFR Appendix B to Part 749 - Catastrophic Act Preparedness Guidelines

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... disaster. (1) A business impact analysis to evaluate potential threats; (2) A risk assessment to determine... the plan; ii. Preservation and ability to restore vital records; iii. A method for restoring vital...

  12. Reconnaissance Report. Sedimentation Problem, Quincy Bay, Illinois

    DTIC Science & Technology

    1987-09-01

    are shown on figure 7 of the Fish and Wildife Service’s Planning Aid Report. Area D5 is primarily an agricultural site located within the Indian Grave...and that the placement of dredged material will be permanent. 20 Disposal Site 1 (designated D5 in the Fish and Wildife Service’s Planning Aid Report...provide a more than adequate depth for recreational craft. The U.S. Fish and Wildife Service, in their Planning Aid Report (appendix B), also has

  13. Selenide isotope generator for the Galileo mission. Reliability program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-10-01

    The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engineering Program Requirements Publication No. SNS-2, dated June 17, 1974. The Reliability Program Plan presented herein defines the total reliability effort without further reference to Government Specifications. The reliability tasks to be accomplished are delineatedmore » herein and become the basis for contract compliance to the extent specified in the SIG contract Statement of Work.« less

  14. 75 FR 13710 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ...-10 standard is determined by calculating the expected number of days in a year with PM-10... PM-10. See 40 CFR part 50, appendix K. A complete year of air quality data, as referred to in 40 CFR... certified. As noted above, the 24-hour PM-10 standard is attained when the expected number of days per year...

  15. Energy Security: Emerging Challenges and Opportunities

    DTIC Science & Technology

    2010-08-01

    46 Appendix A: Electrical Capacity Margins...options........................................................................................ 21 6 Net electrical capacity compared to the North...Energy Security The Army Energy and Water Campaign Plan for Installations defines energy security as: the capacity to avoid adverse impact of energy

  16. 2 CFR Appendix D to Part 225 - Public Assistance Cost Allocation Plans

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Foster Care, and Social Services Block Grant. B. Definitions. 1. “State public assistance agency” means a... reviews by the funding agencies, single audits, or audits conducted by the cognizant audit agency. 2...

  17. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspectionmore » plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.« less

  18. Collection, handling and analysis of specimens for studies of mucosal immunity in animals of veterinary importance - Appendix III

    USDA-ARS?s Scientific Manuscript database

    The validity of data in science depends on the reliability of the collection procedure and the methods used for data analysis. This becomes a major challenge in studies of mucosal immunology since samples for analysis come from various anatomical sources which differ remarkably in their content and ...

  19. 14 CFR Appendix N to Part 25 - Fuel Tank Flammability Exposure and Reliability Analysis

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... flammability exposure time for a fuel tank. (k) Oxygen evolution occurs when oxygen dissolved in the fuel is... evolution from the fuel results in the fuel tank or compartment exceeding the inert level. The applicant must include any times when oxygen evolution from the fuel in the tank or compartment under evaluation...

  20. 14 CFR Appendix N to Part 25 - Fuel Tank Flammability Exposure and Reliability Analysis

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... flammability exposure time for a fuel tank. (k) Oxygen evolution occurs when oxygen dissolved in the fuel is... evolution from the fuel results in the fuel tank or compartment exceeding the inert level. The applicant must include any times when oxygen evolution from the fuel in the tank or compartment under evaluation...

  1. 14 CFR Appendix N to Part 25 - Fuel Tank Flammability Exposure and Reliability Analysis

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... flammability exposure time for a fuel tank. (k) Oxygen evolution occurs when oxygen dissolved in the fuel is... evolution from the fuel results in the fuel tank or compartment exceeding the inert level. The applicant must include any times when oxygen evolution from the fuel in the tank or compartment under evaluation...

  2. 49 CFR Appendix A to Part 665 - Tests To Be Performed at the Bus Testing Facility

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... Because the operator will not become familiar with the detailed design of all new bus models that are tested, tests to determine the time and skill required to remove and reinstall an engine, a transmission... feasible to conduct statistical reliability tests. The detected bus failures, repair time, and the actions...

  3. 49 CFR Appendix A to Part 665 - Tests To Be Performed at the Bus Testing Facility

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... Because the operator will not become familiar with the detailed design of all new bus models that are tested, tests to determine the time and skill required to remove and reinstall an engine, a transmission... feasible to conduct statistical reliability tests. The detected bus failures, repair time, and the actions...

  4. 49 CFR Appendix A to Part 665 - Tests To Be Performed at the Bus Testing Facility

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... Because the operator will not become familiar with the detailed design of all new bus models that are tested, tests to determine the time and skill required to remove and reinstall an engine, a transmission... feasible to conduct statistical reliability tests. The detected bus failures, repair time, and the actions...

  5. 14 CFR Appendix N to Part 25 - Fuel Tank Flammability Exposure and Reliability Analysis

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the performance of a flammability reduction means (FRM) if installed. (c) The following definitions... average fuel temperature within the fuel tank or different sections of the tank if the tank is subdivided... the flight time, and the post-flight time is a constant 30 minutes. (c) Flammable. With respect to a...

  6. 14 CFR Appendix N to Part 25 - Fuel Tank Flammability Exposure and Reliability Analysis

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the performance of a flammability reduction means (FRM) if installed. (c) The following definitions... average fuel temperature within the fuel tank or different sections of the tank if the tank is subdivided... the flight time, and the post-flight time is a constant 30 minutes. (c) Flammable. With respect to a...

  7. 23 CFR Appendix to Part 657 - Guidelines To Be Used in Developing Enforcement Plans and Certification Evaluation

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... program elements. Some comparative factors are: 1. Truck registration (excluding pickups and panels) 2... can become factors that in the aggregate are descriptive of a State's characteristics and can identify...

  8. 23 CFR Appendix to Part 657 - Guidelines To Be Used in Developing Enforcement Plans and Certification Evaluation

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... program elements. Some comparative factors are: 1. Truck registration (excluding pickups and panels) 2... can become factors that in the aggregate are descriptive of a State's characteristics and can identify...

  9. 23 CFR Appendix to Part 657 - Guidelines To Be Used in Developing Enforcement Plans and Certification Evaluation

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... program elements. Some comparative factors are: 1. Truck registration (excluding pickups and panels) 2... can become factors that in the aggregate are descriptive of a State's characteristics and can identify...

  10. 23 CFR Appendix to Part 657 - Guidelines To Be Used in Developing Enforcement Plans and Certification Evaluation

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... program elements. Some comparative factors are: 1. Truck registration (excluding pickups and panels) 2... can become factors that in the aggregate are descriptive of a State's characteristics and can identify...

  11. 23 CFR Appendix to Part 657 - Guidelines To Be Used in Developing Enforcement Plans and Certification Evaluation

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... program elements. Some comparative factors are: 1. Truck registration (excluding pickups and panels) 2... can become factors that in the aggregate are descriptive of a State's characteristics and can identify...

  12. 23 CFR 450.318 - Transportation planning studies and project development.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... and the FTA, as appropriate. (c) By agreement of the NEPA lead agencies, the above integration may be... processes is contained in Appendix A to this part, including an explanation that it is non-binding guidance...

  13. 23 CFR 450.318 - Transportation planning studies and project development.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... and the FTA, as appropriate. (c) By agreement of the NEPA lead agencies, the above integration may be... processes is contained in Appendix A to this part, including an explanation that it is non-binding guidance...

  14. 23 CFR 450.318 - Transportation planning studies and project development.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... and the FTA, as appropriate. (c) By agreement of the NEPA lead agencies, the above integration may be... processes is contained in Appendix A to this part, including an explanation that it is non-binding guidance...

  15. Comments for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit)

    EPA Pesticide Factsheets

    List of comments for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit: Massachusetts Plan Approval including nonattainment NSR Appendix A requirements).

  16. RMP Guidance for Warehouses - Appendix A/B: 40 CFR part 68/Selected NAICS Codes

    EPA Pesticide Factsheets

    These appendices contain the full text of 40 Code of Federal Regulations Part 68, Chemical Accident Prevention Provisions; which includes hazard assessment, emergency response, substance thresholds, reporting requirements, and the Risk Management Plan.

  17. 76 FR 51903 - Approval and Promulgation of Air Quality Implementation Plans; Colorado; Revised Definitions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ... T- Butyl Acetate as a non-criteria reportable pollutant in Regulation 3, Appendix B. The second... Ethyl Ketone as a reportable compound. Second, the State added T-Butyl Acetate as a non-criteria...

  18. 17 CFR Appendix A to Part 39 - Application Guidance and Compliance With Core Principles

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... management tools such as stress testing and value at risk calculations; and c. What contingency plans the... informal, which the clearing organization views as appropriate and applicable to its operations. 2. How...

  19. Army Strategic Logistics Plan: Enabling Strategic Responsiveness Through a Revolution in Military Logistics

    DTIC Science & Technology

    2002-01-01

    D-5 AAN CSS Franchise Report...D-6 CSS Franchise Issues Summary for TDAPII...Appendix D. The ASLP groups the initiatives in the six investment categories of automation and communications, business process change, organizational

  20. RMP Guidance for Chemical Distributors - Introduction

    EPA Pesticide Factsheets

    If you handle, manufacture, use, or store any of the toxic and flammable substances (e.g., chlorine, ammonia) listed in Appendix A above the specified threshold quantities in a process, you are required to develop and implement a risk management plan.

Top