Sample records for reliability program plan

  1. Selenide isotope generator for the Galileo mission. Reliability program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-10-01

    The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engineering Program Requirements Publication No. SNS-2, dated June 17, 1974. The Reliability Program Plan presented herein defines the total reliability effort without further reference to Government Specifications. The reliability tasks to be accomplished are delineatedmore » herein and become the basis for contract compliance to the extent specified in the SIG contract Statement of Work.« less

  2. 76 FR 17159 - Office of New Reactors; Final Interim Staff Guidance on Standard Review Plan, Section 17.4...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-28

    ... Interim Staff Guidance on Standard Review Plan, Section 17.4, ``Reliability Assurance Program'' AGENCY... design reliability assurance program (RAP). This ISG updates the guidance provided to the staff in Standard Review Plan (SRP), Section 17.4, ``Reliability Assurance Program,'' of NUREG-0800, ``Standard...

  3. Reliability program requirements for aeronautical and space system contractors

    NASA Technical Reports Server (NTRS)

    1987-01-01

    General reliability program requirements for NASA contracts involving the design, development, fabrication, test, and/or use of aeronautical and space systems including critical ground support equipment are prescribed. The reliability program requirements require (1) thorough planning and effective management of the reliability effort; (2) definition of the major reliability tasks and their place as an integral part of the design and development process; (3) planning and evaluating the reliability of the system and its elements (including effects of software interfaces) through a program of analysis, review, and test; and (4) timely status indication by formal documentation and other reporting to facilitate control of the reliability program.

  4. Transit Reliability Information Program : Reliability Verification Demonstration Plan for Rapid Rail Vehicles

    DOT National Transportation Integrated Search

    1981-08-01

    The Transit Reliability Information Program (TRIP) is a government-initiated program to assist the transit industry in satisfying its need for transit reliability information. TRIP provides this assistance through the operation of a national Data Ban...

  5. Safety, reliability, maintainability and quality provisions for the Space Shuttle program

    NASA Technical Reports Server (NTRS)

    1990-01-01

    This publication establishes common safety, reliability, maintainability and quality provisions for the Space Shuttle Program. NASA Centers shall use this publication both as the basis for negotiating safety, reliability, maintainability and quality requirements with Shuttle Program contractors and as the guideline for conduct of program safety, reliability, maintainability and quality activities at the Centers. Centers shall assure that applicable provisions of the publication are imposed in lower tier contracts. Centers shall give due regard to other Space Shuttle Program planning in order to provide an integrated total Space Shuttle Program activity. In the implementation of safety, reliability, maintainability and quality activities, consideration shall be given to hardware complexity, supplier experience, state of hardware development, unit cost, and hardware use. The approach and methods for contractor implementation shall be described in the contractors safety, reliability, maintainability and quality plans. This publication incorporates provisions of NASA documents: NHB 1700.1 'NASA Safety Manual, Vol. 1'; NHB 5300.4(IA), 'Reliability Program Provisions for Aeronautical and Space System Contractors'; and NHB 5300.4(1B), 'Quality Program Provisions for Aeronautical and Space System Contractors'. It has been tailored from the above documents based on experience in other programs. It is intended that this publication be reviewed and revised, as appropriate, to reflect new experience and to assure continuing viability.

  6. Pre- and Post-Planned Evaluation: Which Is Preferable?

    ERIC Educational Resources Information Center

    Strasser, Stephen; Deniston, O. Lynn

    1978-01-01

    Factors involved in pre-planned and post-planned evaluation of program effectiveness are compared: (1) reliability and cost of data; (2) internal and external validity; (3) obtrusiveness and threat; (4) goal displacement and program direction. A model to help program administrators decide which approach is more appropriate is presented. (Author/MH)

  7. 50 CFR 600.1004 - Accepting a request for, and determinations about initiating, a financed program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... design, propose, and adopt a timely and reliable implementation plan as well as propose and issue timely and reliable implementation regulations and otherwise complete the program in accordance with this...

  8. Systems design study of the Pioneer Venus spacecraft. Volume 2. Preliminary program development plan

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The preliminary development plan for the Pioneer Venus program is presented. This preliminary plan treats only developmental aspects that would have a significant effect on program cost. These significant development areas were: master program schedule planning; test planning - both unit and system testing for probes/orbiter/ probe bus; ground support equipment; performance assurance; and science integration Various test planning options and test method techniques were evaluated in terms of achieving a low-cost program without degrading mission performance or system reliability. The approaches studied and the methodology of the selected approach are defined.

  9. Trial application of reliability technology to emergency diesel generators at the Trojan Nuclear Power Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wong, S.M.; Boccio, J.L.; Karimian, S.

    1986-01-01

    In this paper, a trial application of reliability technology to the emergency diesel generator system at the Trojan Nuclear Power Plant is presented. An approach for formulating a reliability program plan for this system is being developed. The trial application has shown that a reliability program process, using risk- and reliability-based techniques, can be interwoven into current plant operational activities to help in controlling, analyzing, and predicting faults that can challenge safety systems. With the cooperation of the utility, Portland General Electric Co., this reliability program can eventually be implemented at Trojan to track its effectiveness.

  10. Study of solid rocket motors for a space shuttle booster. Volume 3: Program acquisition planning

    NASA Technical Reports Server (NTRS)

    Vonderesch, A. H.

    1972-01-01

    Plans for conducting Phase C/D for a solid rocket motor booster vehicle are presented. Methods for conducting this program with details of scheduling, testing, and program management and control are included. The requirements of the space shuttle program to deliver a minimum cost/maximum reliability booster vehicle are examined.

  11. Navstar Global Positioning System (GPS) clock program: Present and future

    NASA Technical Reports Server (NTRS)

    Tennant, D. M.

    1981-01-01

    Global Positioning System (GPS) program status are discussed and plans for ensuring the long term continuation of the program are presented. Performance of GPS clocks is presented in terms of on orbit data as portrayed by GPS master control station kalman filter processing. The GPS Clock reliability program is reviewed in depth and future plans fo the overall clock program are published.

  12. Reliability techniques in the petroleum industry

    NASA Technical Reports Server (NTRS)

    Williams, H. L.

    1971-01-01

    Quantitative reliability evaluation methods used in the Apollo Spacecraft Program are translated into petroleum industry requirements with emphasis on offsetting reliability demonstration costs and limited production runs. Described are the qualitative disciplines applicable, the definitions and criteria that accompany the disciplines, and the generic application of these disciplines to the chemical industry. The disciplines are then translated into proposed definitions and criteria for the industry, into a base-line reliability plan that includes these disciplines, and into application notes to aid in adapting the base-line plan to a specific operation.

  13. Advanced Launch System advanced development oxidizer turbopump program: Technical implementation plan

    NASA Technical Reports Server (NTRS)

    Ferlita, F.

    1989-01-01

    The Advanced Launch Systems (ALS) Advanced Development Oxidizer Turbopump Program has designed, fabricated and demonstrated a low cost, highly reliable oxidizer turbopump for the Space Transportation Engine that minimizes the recurring cost for the ALS engines. Pratt and Whitney's (P and W's) plan for integrating the analyses, testing, fabrication, and other program efforts is addressed. This plan offers a comprehensive description of the total effort required to design, fabricate, and test the ALS oxidizer turbopump. The proposed ALS oxidizer turbopump reduces turbopump costs over current designs by taking advantage of design simplicity and state-of-the-art materials and producibility features without compromising system reliability. This is accomplished by selecting turbopump operating conditions that are within known successful operating regions and by using proven manufacturing techniques.

  14. Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.

  15. Missile and Space Systems Reliability versus Cost Trade-Off Study

    DTIC Science & Technology

    1983-01-01

    F00-1C09 Robert C. Schneider F00-1C09 V . PERFORMING ORGANIZATION NAME AM0 ADDRESS 16 PRGRAM ELEMENT. PROJECT. TASK BoeingAerosace CmpAnyA CA WORK UNIT...reliability problems, which has the - real bearing on program effectiveness. A well planned and funded reliability effort can prevent or ferret out...failure analysis, and the in- corporation and verification of design corrections to prevent recurrence of failures. 302.2.2 A TMJ test plan shall be

  16. Reliability database development for use with an object-oriented fault tree evaluation program

    NASA Technical Reports Server (NTRS)

    Heger, A. Sharif; Harringtton, Robert J.; Koen, Billy V.; Patterson-Hine, F. Ann

    1989-01-01

    A description is given of the development of a fault-tree analysis method using object-oriented programming. In addition, the authors discuss the programs that have been developed or are under development to connect a fault-tree analysis routine to a reliability database. To assess the performance of the routines, a relational database simulating one of the nuclear power industry databases has been constructed. For a realistic assessment of the results of this project, the use of one of existing nuclear power reliability databases is planned.

  17. Corrosion Prevention and Control Planning Guidebook Spiral 3

    DTIC Science & Technology

    2007-09-01

    programs. 5. Develop and recommend corrective and preventive procedures based on reliability and maintainability analyses of field data on similar in...One of the many challenges facing the Program/Acquisition Managers is the ability to develop a meaningful Corrosion Prevention and Control Plan...designated program manager of all activities associated with the acquisition, development , production, fielding , sustainment, and disposal of a DoD weapon

  18. Enhanced Damage-Resistant Optics for Spaceflight Laser Systems: Workshop findings and recommendations

    NASA Technical Reports Server (NTRS)

    Schulze, Norman; Cimolino, Marc; Guenther, Arthur; Mcminn, Ted; Rainer, Frank; Schmid, Ansgar; Seitel, Steven C.; Soileau, M. J.; Theon, John S.; Walz, William

    1991-01-01

    NASA has defined a program to address critical laser-induced damage issues peculiar to its remote sensing systems. The Langley Research Center (LaRC), with input from the Goddard Space Flight Center (GSFC), has developed a program plan focusing on the certification of optical materials for spaceflight applications and the development of techniques to determine the reliability of such materials under extended laser exposures. This plan involves cooperative efforts between NASA and optics manufacturers to quantify the performance of optical materials for NASA systems and to ensure NASA's continued application of the highest quality optics possible for enhanced system reliability. A review panel was organized to assess NASA's optical damage concerns and to evaluate the effectiveness of the LaRC proposed program plan. This panel consisted of experts in the areas of laser-induced damage, optical coating manufacture, and the design and development of laser systems for space. The panel was presented information on NASA's current and planned laser remote sensing programs, laser-induced damage problems already encountered in NASA systems, and the proposed program plan to address these issues. Additionally, technical presentations were made on the state of the art in damage mechanisms, optical materials testing, and issues of coating manufacture germane to laser damage.

  19. 2nd Generation RLV Risk Reduction Definition Program: Pratt & Whitney Propulsion Risk Reduction Requirements Program (TA-3 & TA-4)

    NASA Technical Reports Server (NTRS)

    Matlock, Steve

    2001-01-01

    This is the final report and addresses all of the work performed on this program. Specifically, it covers vehicle architecture background, definition of six baseline engine cycles, reliability baseline (space shuttle main engine QRAS), and component level reliability/performance/cost for the six baseline cycles, and selection of 3 cycles for further study. This report further addresses technology improvement selection and component level reliability/performance/cost for the three cycles selected for further study, as well as risk reduction plans, and recommendation for future studies.

  20. General test plan redundant sensor strapdown IMU evaluation program

    NASA Technical Reports Server (NTRS)

    Hartwell, T.; Irwin, H. A.; Miyatake, Y.; Wedekind, D. E.

    1971-01-01

    The general test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The inertial unit contains six gyros and three orthogonal accelerometers. The software incorporates failure detection and correction logic and a land vehicle navigation program. The principal objective of the test is a demonstration of the practicability, reliability, and performance of the inertial measuring unit with failure detection and correction in operational environments.

  1. Active Reliability Engineering - Technical Concept and Program Plan. A Solid-State Systems Approach to Increased Reliability and Availability in Military Systems.

    DTIC Science & Technology

    1983-10-05

    battle damage. Others are local electrical power and cooling disruptions. Again, a highly critical function is lost if its computer site is destroyed. A...formalized design of the test bed to meet the requirements of the functional description and goals of the program. AMTEC --Z3IT TASKS: 610, 710, 810

  2. Adult Literacy Education: Program Evaluation and Learner Assessment. Information Series No. 338.

    ERIC Educational Resources Information Center

    Lytle, Susan L.; Wolfe, Marcie

    Adult literacy programs need reliable information about program quality and effectiveness for accountability, improvement of practice, and expansion of knowledge. Evaluation and assessment reflect fundamental beliefs about adult learners, concepts of literacy, and educational settings. Resources for planning program evaluations include surveys,…

  3. Electron/proton spectrometer certification documentation analyses

    NASA Technical Reports Server (NTRS)

    Gleeson, P.

    1972-01-01

    A compilation of analyses generated during the development of the electron-proton spectrometer for the Skylab program is presented. The data documents the analyses required by the electron-proton spectrometer verification plan. The verification plan was generated to satisfy the ancillary hardware requirements of the Apollo Applications program. The certification of the spectrometer requires that various tests, inspections, and analyses be documented, approved, and accepted by reliability and quality control personnel of the spectrometer development program.

  4. 40 CFR 122.25 - Aquaculture projects (applicable to State NPDES programs, see § 123.25).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... applicant plans to confine the cultivated species, using a method or plan or operation (including, but not limited to, physical confinement) which, on the basis of reliable scientific evidence, is expected to...

  5. 40 CFR 122.25 - Aquaculture projects (applicable to State NPDES programs, see § 123.25).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... applicant plans to confine the cultivated species, using a method or plan or operation (including, but not limited to, physical confinement) which, on the basis of reliable scientific evidence, is expected to...

  6. 40 CFR 122.25 - Aquaculture projects (applicable to State NPDES programs, see § 123.25).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... applicant plans to confine the cultivated species, using a method or plan or operation (including, but not limited to, physical confinement) which, on the basis of reliable scientific evidence, is expected to...

  7. 40 CFR 122.25 - Aquaculture projects (applicable to State NPDES programs, see § 123.25).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... applicant plans to confine the cultivated species, using a method or plan or operation (including, but not limited to, physical confinement) which, on the basis of reliable scientific evidence, is expected to...

  8. Small Business: Action Needed to Determine Whether DOD’s Comprehensive Subcontracting Plan Test Program Should Be Made Permanent

    DTIC Science & Technology

    2015-11-01

    collected. We determined that the methodologies were valid and the data were reliable for our purposes. In addition, we interviewed DOD officials and...of contracts and cost of labor involved in preparing program documentation, to arrive at the estimates for savings. To validate the data used in the...studies to be reasonable, and the data were sufficiently reliable for our purposes. We interviewed officials from DOD and 5 of the 12 Test Program

  9. Space shuttle program: Shuttle Avionics Integration Laboratory. Volume 7: Logistics management plan

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The logistics management plan for the shuttle avionics integration laboratory defines the organization, disciplines, and methodology for managing and controlling logistics support. Those elements requiring management include maintainability and reliability, maintenance planning, support and test equipment, supply support, transportation and handling, technical data, facilities, personnel and training, funding, and management data.

  10. A Reliability Simulator for Radiation-Hard Microelectronics Development

    DTIC Science & Technology

    1991-07-01

    1 3.0 PHASE II WORK PLANS ................................................................ 2... plan . The correlation experimental details including the devices utilized, the hot-carrier stressing and the wafer-level radiation correlation procedure...channel devices, and a new lifetime extrapolation method is demonstrated for p-channel devices. 3.0 PHASE II WORK PLANS The Phase 1I program consisted of

  11. A screening mammography program. Staying alive and making it work.

    PubMed

    Monsees, B S; Destouet, J M

    1992-01-01

    The success of a mammography screening program requires thorough planning. A dependably high volume and a streamlined efficient operation are essential to survival of the program. Factors that warrant consideration prior to designing such a program include the following: Distinction between screening and diagnostic mammography examinations. Selection of a site that will meet the needs of the community and yet provide a consistently high volume. Low examination cost for screening mammography coupled with a detailed financial analysis and reappraisal on an ongoing basis. A customized marketing program that incorporates methods to increase awareness, compliance, and utilization by women and referring physicians. Well-trained, efficient, and dedicated personnel. An operation that is designed for rapid throughput and expeditious patient flow. An efficient plan for film handling, interpretation, reporting, and storage. Timely communication of examination results. A reliable mechanism for follow-up evaluation and outcome data collection. Establishment of a consistent and reliable quality assurance program and the production of high quality mammograms.

  12. Operationally efficient propulsion system study (OEPSS) data book. Volume 9; Preliminary Development Plan for an Integrated Booster Propulsion Module (BPM)

    NASA Technical Reports Server (NTRS)

    DiBlasi, Angelo G.

    1992-01-01

    A preliminary development plan for an integrated propulsion module (IPM) is described. The IPM, similar to the Space Transportation Main engine (STME) engine, is applicable to the Advanced Launch System (ALS) baseline vehicle. The same STME development program ground rules and time schedule were assumed for the IPM. However, the unique advantages of testing an integrated engine element, in terms of reduced number of hardware and number of system and reliability tests, compared to single standalone engine and MPTA, are highlighted. The potential ability of the IPM to meet the ALS program goals for robustness, operability and reliability is emphasized.

  13. Hybrid propulsion technology program

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Technology was identified which will enable application of hybrid propulsion to manned and unmanned space launch vehicles. Two design concepts are proposed. The first is a hybrid propulsion system using the classical method of regression (classical hybrid) resulting from the flow of oxidizer across a fuel grain surface. The second system uses a self-sustaining gas generator (gas generator hybrid) to produce a fuel rich exhaust that was mixed with oxidizer in a separate combustor. Both systems offer cost and reliability improvement over the existing solid rocket booster and proposed liquid boosters. The designs were evaluated using life cycle cost and reliability. The program consisted of: (1) identification and evaluation of candidate oxidizers and fuels; (2) preliminary evaluation of booster design concepts; (3) preparation of a detailed point design including life cycle costs and reliability analyses; (4) identification of those hybrid specific technologies needing improvement; and (5) preperation of a technology acquisition plan and large scale demonstration plan.

  14. Reliability of an interactive computer program for advance care planning.

    PubMed

    Schubart, Jane R; Levi, Benjamin H; Camacho, Fabian; Whitehead, Megan; Farace, Elana; Green, Michael J

    2012-06-01

    Despite widespread efforts to promote advance directives (ADs), completion rates remain low. Making Your Wishes Known: Planning Your Medical Future (MYWK) is an interactive computer program that guides individuals through the process of advance care planning, explaining health conditions and interventions that commonly involve life or death decisions, helps them articulate their values/goals, and translates users' preferences into a detailed AD document. The purpose of this study was to demonstrate that (in the absence of major life changes) the AD generated by MYWK reliably reflects an individual's values/preferences. English speakers ≥30 years old completed MYWK twice, 4 to 6 weeks apart. Reliability indices were assessed for three AD components: General Wishes; Specific Wishes for treatment; and Quality-of-Life values (QoL). Twenty-four participants completed the study. Both the Specific Wishes and QoL scales had high internal consistency in both time periods (Knuder Richardson formula 20 [KR-20]=0.83-0.95, and 0.86-0.89). Test-retest reliability was perfect for General Wishes (κ=1), high for QoL (Pearson's correlation coefficient=0.83), but lower for Specific Wishes (Pearson's correlation coefficient=0.57). MYWK generates an AD where General Wishes and QoL (but not Specific Wishes) statements remain consistent over time.

  15. Reliability of an Interactive Computer Program for Advance Care Planning

    PubMed Central

    Levi, Benjamin H.; Camacho, Fabian; Whitehead, Megan; Farace, Elana; Green, Michael J

    2012-01-01

    Abstract Despite widespread efforts to promote advance directives (ADs), completion rates remain low. Making Your Wishes Known: Planning Your Medical Future (MYWK) is an interactive computer program that guides individuals through the process of advance care planning, explaining health conditions and interventions that commonly involve life or death decisions, helps them articulate their values/goals, and translates users' preferences into a detailed AD document. The purpose of this study was to demonstrate that (in the absence of major life changes) the AD generated by MYWK reliably reflects an individual's values/preferences. English speakers ≥30 years old completed MYWK twice, 4 to 6 weeks apart. Reliability indices were assessed for three AD components: General Wishes; Specific Wishes for treatment; and Quality-of-Life values (QoL). Twenty-four participants completed the study. Both the Specific Wishes and QoL scales had high internal consistency in both time periods (Knuder Richardson formula 20 [KR-20]=0.83–0.95, and 0.86–0.89). Test-retest reliability was perfect for General Wishes (κ=1), high for QoL (Pearson's correlation coefficient=0.83), but lower for Specific Wishes (Pearson's correlation coefficient=0.57). MYWK generates an AD where General Wishes and QoL (but not Specific Wishes) statements remain consistent over time. PMID:22512830

  16. Failure mode analysis to predict product reliability.

    NASA Technical Reports Server (NTRS)

    Zemanick, P. P.

    1972-01-01

    The failure mode analysis (FMA) is described as a design tool to predict and improve product reliability. The objectives of the failure mode analysis are presented as they influence component design, configuration selection, the product test program, the quality assurance plan, and engineering analysis priorities. The detailed mechanics of performing a failure mode analysis are discussed, including one suggested format. Some practical difficulties of implementation are indicated, drawn from experience with preparing FMAs on the nuclear rocket engine program.

  17. A plan for the North American Bat Monitoring Program (NABat)

    Treesearch

    Susan C. Loeb; Thomas J. Rodhouse; Laura E. Ellison; Cori L. Lausen; Jonathan D. Reichard; Kathryn M. Irvine; Thomas E. Ingersoll; Jeremy T.H. Coleman; Wayne E. Thogmartin; John R. Sauer; Charles M. Francis; Mylea L. Bayless; Thomas R. Stanley; Douglas H. Johnson

    2015-01-01

    The purpose of the North American Bat Monitoring Program (NABat) is to create a continent-wide program to monitor bats at local to rangewide scales that will provide reliable data to promote effective conservation decisionmaking and the long-term viability of bat populations across the continent. This is an international, multiagency program. Four approaches will be...

  18. Ultra Reliability Workshop Introduction

    NASA Technical Reports Server (NTRS)

    Shapiro, Andrew A.

    2006-01-01

    This plan is the accumulation of substantial work by a large number of individuals. The Ultra-Reliability team consists of representatives from each center who have agreed to champion the program and be the focal point for their center. A number of individuals from NASA, government agencies (including the military), universities, industry and non-governmental organizations also contributed significantly to this effort. Most of their names may be found on the Ultra-Reliability PBMA website.

  19. DOE-NE Proliferation and Terrorism Risk Assessment: FY12 Plans Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sadasivan, Pratap

    2012-06-21

    This presentation provides background information on FY12 plans for the DOE Office of Nuclear Energy Proliferation and Terrorism Risk Assessment program. Program plans, organization, and individual project elements are described. Research objectives are: (1) Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of current reactors; (2) Develop improvements in the affordability of new reactors to enable nuclear energy; (3) Develop Sustainable Nuclear Fuel Cycles; and (4) Understand and minimize the risks of nuclear proliferation and terrorism - Goal is to enable the use of risk information to inform NE R&D programmore » planning.« less

  20. History of Reliability and Quality Assurance at Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Childers, Frank M.

    2004-01-01

    This Kennedy Historical Document (KHD) provides a unique historical perspective of the organizational and functional responsibilities for the manned and un-manned programs at Kennedy Space Center, Florida. As systems become more complex and hazardous, the attention to detailed planning and execution continues to be a challenge. The need for a robust reliability and quality assurance program will always be a necessity to ensure mission success. As new space missions are defined and technology allows for continued access to space, these programs cannot be compromised. The organizational structure that has provided the reliability and quality assurance functions for both the manned and unmanned programs has seen many changes since the first group came to Florida in the 1950's. The roles of government and contractor personnel have changed with each program and organizational alignment has changed based on that responsibility. The organizational alignment of the personnel performing these functions must ensure independent assessment of the processes.

  1. Descriptive Model of Generic WAMS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hauer, John F.; DeSteese, John G.

    The Department of Energy’s (DOE) Transmission Reliability Program is supporting the research, deployment, and demonstration of various wide area measurement system (WAMS) technologies to enhance the reliability of the Nation’s electrical power grid. Pacific Northwest National Laboratory (PNNL) was tasked by the DOE National SCADA Test Bed Program to conduct a study of WAMS security. This report represents achievement of the milestone to develop a generic WAMS model description that will provide a basis for the security analysis planned in the next phase of this study.

  2. A Reliability Improvement Program Planning Report for the SNAP 10A Space Nuclear Power Unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coombs, M. G.; Smith, C. K.; Wilson, L. A.

    1961-03-14

    The estimated achieved reliability of SNAP 10A space nuclear power units will be relatively low at the timeof the first SNAPSHOT flight test in April 1963 and the existing R&D program does not provide a significant reliabiity growth thereafter. The total costs of an 8-satellite network using SNAP 10A units over a 5-year period has been approximated for the case where the total cost of a single satellite launched is 8 million dollars.

  3. A reliability as an independent variable (RAIV) methodology for optimizing test planning for liquid rocket engines

    NASA Astrophysics Data System (ADS)

    Strunz, Richard; Herrmann, Jeffrey W.

    2011-12-01

    The hot fire test strategy for liquid rocket engines has always been a concern of space industry and agency alike because no recognized standard exists. Previous hot fire test plans focused on the verification of performance requirements but did not explicitly include reliability as a dimensioning variable. The stakeholders are, however, concerned about a hot fire test strategy that balances reliability, schedule, and affordability. A multiple criteria test planning model is presented that provides a framework to optimize the hot fire test strategy with respect to stakeholder concerns. The Staged Combustion Rocket Engine Demonstrator, a program of the European Space Agency, is used as example to provide the quantitative answer to the claim that a reduced thrust scale demonstrator is cost beneficial for a subsequent flight engine development. Scalability aspects of major subsystems are considered in the prior information definition inside the Bayesian framework. The model is also applied to assess the impact of an increase of the demonstrated reliability level on schedule and affordability.

  4. Predicting Vandalism in a General Youth Sample via the HEW Youth Development Model's Community Program Impact Scales, Age, and Sex.

    ERIC Educational Resources Information Center

    Truckenmiller, James L.

    The former HEW National Strategy for Youth Development model was a community-based planning and procedural tool to enhance and to prevent delinquency through a process of youth needs assessments, needs targeted programs, and program impact evaluation. The program's 12 Impact Scales have been found to have acceptable reliabilities, substantial…

  5. Reliability Technology to Achieve Insertion of Advanced Packaging (RELTECH) program

    NASA Astrophysics Data System (ADS)

    Fayette, Daniel F.; Speicher, Patricia; Stoklosa, Mark J.; Evans, Jillian V.; Evans, John W.; Gentile, Mike; Pagel, Chuck A.; Hakim, Edward

    1993-08-01

    A joint military-commercial effort to evaluate multichip module (MCM) structures is discussed. The program, Reliability Technology to Achieve Insertion of Advanced Packaging (RELTECH), has been designed to identify the failure mechanisms that are possible in MCM structures. The RELTECH test vehicles, technical assessment task, product evaluation plan, reliability modeling task, accelerated and environmental testing, and post-test physical analysis and failure analysis are described. The information obtained through RELTECH can be used to address standardization issues, through development of cost effective qualification and appropriate screening criteria, for inclusion into a commercial specification and the MIL-H-38534 general specification for hybrid microcircuits.

  6. Reliability Technology to Achieve Insertion of Advanced Packaging (RELTECH) program

    NASA Technical Reports Server (NTRS)

    Fayette, Daniel F.; Speicher, Patricia; Stoklosa, Mark J.; Evans, Jillian V.; Evans, John W.; Gentile, Mike; Pagel, Chuck A.; Hakim, Edward

    1993-01-01

    A joint military-commercial effort to evaluate multichip module (MCM) structures is discussed. The program, Reliability Technology to Achieve Insertion of Advanced Packaging (RELTECH), has been designed to identify the failure mechanisms that are possible in MCM structures. The RELTECH test vehicles, technical assessment task, product evaluation plan, reliability modeling task, accelerated and environmental testing, and post-test physical analysis and failure analysis are described. The information obtained through RELTECH can be used to address standardization issues, through development of cost effective qualification and appropriate screening criteria, for inclusion into a commercial specification and the MIL-H-38534 general specification for hybrid microcircuits.

  7. EBMUD Drought Planning Put to the Test in 2014

    NASA Astrophysics Data System (ADS)

    Bray, B. S.

    2014-12-01

    The East Bay Municipal Utility District faced challenges in the unprecedented 2014 drought managing limited supplies to reliably serve its customers. The District's successful drought planning required a multi-faceted plan to preserve a reliable water supply, now and into the future. Planning has included investments in recycled water projects, passive and active customer conservation programs, and pursuit of alternative water supply options. EBMUD's drought planning efforts have been tested in 2014 when California experienced one of the driest years on record and the 2nd driest year in the Mokelumne Watershed, the source of 90% of the District's water supply. This presentation will highlight the effectiveness of drought planning in three areas: (1) implementing 10% water conservation as of July 2014, (2) the securing of nearly 20TAF of supplemental water supply conveyed through the Freeport Regional Water Project, and (3) operating EBMUD's Mokelumne River Project to meet fishery flow and water quality objectives.

  8. Preoperative Planning of Orthopedic Procedures using Digitalized Software Systems.

    PubMed

    Steinberg, Ely L; Segev, Eitan; Drexler, Michael; Ben-Tov, Tomer; Nimrod, Snir

    2016-06-01

    The progression from standard celluloid films to digitalized technology led to the development of new software programs to fulfill the needs of preoperative planning. We describe here preoperative digitalized programs and the variety of conditions for which those programs can be used to facilitate preparation for surgery. A PubMed search using the keywords "digitalized software programs," "preoperative planning" and "total joint arthroplasty" was performed for all studies regarding preoperative planning of orthopedic procedures that were published from 1989 to 2014 in English. Digitalized software programs are enabled to import and export all picture archiving communication system (PACS) files (i.e., X-rays, computerized tomograms, magnetic resonance images) from either the local working station or from any remote PACS. Two-dimension (2D) and 3D CT scans were found to be reliable tools with a high preoperative predicting accuracy for implants. The short learning curve, user-friendly features, accurate prediction of implant size, decreased implant stocks and low-cost maintenance makes digitalized software programs an attractive tool in preoperative planning of total joint replacement, fracture fixation, limb deformity repair and pediatric skeletal disorders.

  9. Development of a Comprehensive and Interactive Tool to Inform State Violence and Injury Prevention Plans.

    PubMed

    Wilson, Lauren; Deokar, Angela J; Zaesim, Araya; Thomas, Karen; Kresnow-Sedacca, Marcie-Jo

    The Center of Disease Control and Prevention's Core State Violence and Injury Prevention Program (Core SVIPP) provides an opportunity for states to engage with their partners to implement, evaluate, and disseminate strategies that lead to the reduction and prevention of injury and violence. Core SVIPP requires awardees to develop or update their state injury and violence plans. Currently, literature informing state planning efforts is limited, especially regarding materials related to injury and violence. Presumably, plans that are higher quality result in having a greater impact on preventing injury and violence, and literature to improve quality would benefit prevention programming. (1) To create a comprehensive injury-specific index to aid in the development and revision of state injury and violence prevention plans, and (2) to assess the reliability and utility of this index. Through an iterative development process, a workgroup of subject matter experts created the Violence and Injury Prevention: Comprehensive Index Tool (VIP:CIT). The tool was pilot tested on 3 state injury and violence prevention plans and assessed for initial usability. Following revisions to the tool (ie, a rubric was developed to further delineate consistent criteria for rating; items were added and clarified), the same state plans were reassessed to test interrater reliability and tool utility. For the second assessment, reliability of the VIP:CIT improved, indicating that the rubric was a useful addition. Qualitative feedback from states suggested that the tool significantly helped guide plan development and communicate about planning processes. The final VIP:CIT is a tool that can help increase plan quality, decrease the research-to-practice gap, and increase connectivity to emerging public health paradigms. The tool provides an example of tailoring guidance materials to reflect academic literature, and it can be easily adapted to other topic areas to promote quality of strategic plans for numerous outcomes.

  10. Development of a Comprehensive and Interactive Tool to Inform State Violence and Injury Prevention Plans

    PubMed Central

    Wilson, Lauren; Deokar, Angela J.; Zaesim, Araya; Thomas, Karen; Kresnow-Sedacca, Marcie-jo

    2018-01-01

    Context The Center of Disease Control and Prevention’s Core State Violence and Injury Prevention Program (Core SVIPP) provides an opportunity for states to engage with their partners to implement, evaluate, and disseminate strategies that lead to the reduction and prevention of injury and violence. Core SVIPP requires awardees to develop or update their state injury and violence plans. Currently, literature informing state planning efforts is limited, especially regarding materials related to injury and violence. Presumably, plans that are higher quality result in having a greater impact on preventing injury and violence, and literature to improve quality would benefit prevention programming. Objective (1) To create a comprehensive injury-specific index to aid in the development and revision of state injury and violence prevention plans, and (2) to assess the reliability and utility of this index. Design Through an iterative development process, a workgroup of subject matter experts created the Violence and Injury Prevention: Comprehensive Index Tool (VIP:CIT). The tool was pilot tested on 3 state injury and violence prevention plans and assessed for initial usability. Following revisions to the tool (ie, a rubric was developed to further delineate consistent criteria for rating; items were added and clarified), the same state plans were reassessed to test interrater reliability and tool utility. Results For the second assessment, reliability of the VIP:CIT improved, indicating that the rubric was a useful addition. Qualitative feedback from states suggested that the tool significantly helped guide plan development and communicate about planning processes. Conclusion The final VIP:CIT is a tool that can help increase plan quality, decrease the research-to-practice gap, and increase connectivity to emerging public health paradigms. The tool provides an example of tailoring guidance materials to reflect academic literature, and it can be easily adapted to other topic areas to promote quality of strategic plans for numerous outcomes. PMID:29189505

  11. A Vision for Spaceflight Reliability: NASA's Objectives Based Strategy

    NASA Technical Reports Server (NTRS)

    Groen, Frank; Evans, John; Hall, Tony

    2015-01-01

    In defining the direction for a new Reliability and Maintainability standard, OSMA has extracted the essential objectives that our programs need, to undertake a reliable mission. These objectives have been structured to lead mission planning through construction of an objective hierarchy, which defines the critical approaches for achieving high reliability and maintainability (R M). Creating a hierarchy, as a basis for assurance implementation, is a proven approach; yet, it holds the opportunity to enable new directions, as NASA moves forward in tackling the challenges of space exploration.

  12. Commercial remote sensing & spatial information (CRS & SI) technologies program for reliable transportation systems planning : volume 1 - comparative evaluation of link-level travel time from different technologies and sources.

    DOT National Transportation Integrated Search

    2015-03-01

    Accurate travel time information is required to efficiently plan and effectively manage transportation network. Technologies and : private data sources such as INRIX, TomTom and HERE offer the potential to continuously collect travel time data and us...

  13. ALS rocket engine combustion devices design and demonstration

    NASA Technical Reports Server (NTRS)

    Arreguin, Steve

    1989-01-01

    Work performed during Phase one is summarized and the significant technical and programmatic accomplishments occurring during this period are documented. Besides a summary of the results, methodologies, trade studies, design, fabrication, and hardware conditions; the following are included: the evolving Maintainability Plan, Reliability Program Plan, Failure Summary and Analysis Report, and the Failure Mode and Effect Analysis.

  14. Improving Retention and Enrollment Forecasting in Part-Time Programs

    ERIC Educational Resources Information Center

    Shapiro, Joel; Bray, Christopher

    2011-01-01

    This article describes a model that can be used to analyze student enrollment data and can give insights for improving retention of part-time students and refining institutional budgeting and planning efforts. Adult higher-education programs are often challenged in that part-time students take courses less reliably than full-time students. For…

  15. The Future of the U.S. Nuclear Weapons Program

    NASA Astrophysics Data System (ADS)

    Brooks, Linton F.

    2007-03-01

    This paper will examine our plans for the future of the U.S. nuclear weapons program including efforts to ``transform'' the stockpile and supporting infrastructure. We proceed from the premise that the United States will need a safe, secure, and reliable nuclear deterrent for the foreseeable future. Moreover, the Stockpile Stewardship Program is working. Today's stockpile---comprised of legacy warheads left over from the Cold War---is safe and reliable. That said, we see increased risk, absent nuclear testing, in assuring the long-term safety and reliability of our current stockpile. Nor is today's nuclear weapons complex sufficiently ``responsive'' to fixing technical problems in the stockpile, or to potential adverse geopolitical change. Our task is to work to ensure that the U.S. nuclear weapons enterprise, including the stockpile and supporting infrastructure, meets long-term national security needs. Our approach is to develop and field replacement warheads for the legacy stockpile---so-called Reliable Replacement Warheads (RRW)---as a means to transform both the nuclear stockpile and supporting infrastructure.

  16. Overview of DOE-NE Proliferation and Terrorism Risk Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sadasivan, Pratap

    2012-08-24

    Research objectives are: (1) Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of current reactors; (2) Develop improvements in the affordability of new reactors to enable nuclear energy; (3) Develop Sustainable Nuclear Fuel Cycles; and (4) Understand and minimize the risks of nuclear proliferation and terrorism. The goal is to enable the use of risk information to inform NE R&D program planning. The PTRA program supports DOE-NE's goal of using risk information to inform R&D program planning. The FY12 PTRA program is focused on terrorism risk. The program includes a mixmore » of innovative methods that support the general practice of risk assessments, and selected applications.« less

  17. Data systems and computer science: Software Engineering Program

    NASA Technical Reports Server (NTRS)

    Zygielbaum, Arthur I.

    1991-01-01

    An external review of the Integrated Technology Plan for the Civil Space Program is presented. This review is specifically concerned with the Software Engineering Program. The goals of the Software Engineering Program are as follows: (1) improve NASA's ability to manage development, operation, and maintenance of complex software systems; (2) decrease NASA's cost and risk in engineering complex software systems; and (3) provide technology to assure safety and reliability of software in mission critical applications.

  18. Evaluation of audit-based performance measures for dental care plans.

    PubMed

    Bader, J D; Shugars, D A; White, B A; Rindal, D B

    1999-01-01

    Although a set of clinical performance measures, i.e., a report card for dental plans, has been designed for use with administrative data, most plans do not have administrative data systems containing the data needed to calculate the measures. Therefore, we evaluated the use of a set of proxy clinical performance measures calculated from data obtained through chart audits. Chart audits were conducted in seven dental programs--three public health clinics, two dental health maintenance organizations (DHMO), and two preferred provider organizations (PPO). In all instances audits were completed by clinical staff who had been trained using telephone consultation and a self-instructional audit manual. The performance measures were calculated for the seven programs, audit reliability was assessed in four programs, and for one program the audit-based proxy measures were compared to the measures calculated using administrative data. The audit-based measures were sensitive to known differences in program performance. The chart audit procedures yielded reasonably reliable data. However, missing data in patient charts rendered the calculation of some measures problematic--namely, caries and periodontal disease assessment and experience. Agreement between administrative and audit-based measures was good for most, but not all, measures in one program. The audit-based proxy measures represent a complex but feasible approach to the calculation of performance measures for those programs lacking robust administrative data systems. However, until charts contain more complete diagnostic information (i.e., periodontal charting and diagnostic codes or reason-for-treatment codes), accurate determination of these aspects of clinical performance will be difficult.

  19. Advanced Simulation and Computing Fiscal Year 2016 Implementation Plan, Version 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, M.; Archer, B.; Hendrickson, B.

    2015-08-27

    The Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, surety, and reliability of the U.S. nuclear stockpile. The SSP uses nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of experimental facilities and programs, and the computational capabilities to support these programs. The purpose of this IP is to outline key work requirements to be performed and to control individualmore » work activities within the scope of work. Contractors may not deviate from this plan without a revised WA or subsequent IP.« less

  20. Access 5 - Step 1: Human Systems Integration Program Plan (HSIPP)

    NASA Technical Reports Server (NTRS)

    2005-01-01

    This report describes the Human System Interface (HSI) analysis, design and test activities that will be performed to support the development of requirements and design guidelines to facilitate the incorporation of High Altitude Long Endurance (HALE) Remotely Operated Aircraft (ROA) at or above FL400 in the National Airspace System (NAS). These activities are required to support the design and development of safe, effective and reliable ROA operator and ATC interfaces. This plan focuses on the activities to be completed for Step 1 of the ACCESS 5 program. Updates to this document will be made for each of the four ACCESS 5 program steps.

  1. A Standardized System of Training Intensity Guidelines for the Sports of Track and Field and Cross Country

    ERIC Educational Resources Information Center

    Belcher, Christopher P.; Pemberton, Cynthia Lee A.

    2012-01-01

    Accurate quantification of training intensity is an essential component of a training program (Rowbottom, 2000). A training program designed to optimize athlete performance abilities cannot be practically planned or implemented without a valid and reliable indication of training intensity and its effect on the physiological mechanisms of the human…

  2. National Conference on Integrated Resource Planning: Proceedings

    NASA Astrophysics Data System (ADS)

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners' (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; and key regulatory issues facing gas utilities during the next five years.

  3. Report on phase 1 of the Microprocessor Seminar. [and associated large scale integration

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Proceedings of a seminar on microprocessors and associated large scale integrated (LSI) circuits are presented. The potential for commonality of device requirements, candidate processes and mechanisms for qualifying candidate LSI technologies for high reliability applications, and specifications for testing and testability were among the topics discussed. Various programs and tentative plans of the participating organizations in the development of high reliability LSI circuits are given.

  4. 2nd Generation Reusable Launch Vehicle (2G RLV). Revised

    NASA Technical Reports Server (NTRS)

    Matlock, Steve; Sides, Steve; Kmiec, Tom; Arbogast, Tim; Mayers, Tom; Doehnert, Bill

    2001-01-01

    This is a revised final report and addresses all of the work performed on this program. Specifically, it covers vehicle architecture background, definition of six baseline engine cycles, reliability baseline (space shuttle main engine QRAS), and component level reliability/performance/cost for the six baseline cycles, and selection of 3 cycles for further study. This report further addresses technology improvement selection and component level reliability/performance/cost for the three cycles selected for further study, as well as risk reduction plans, and recommendation for future studies.

  5. Tracer-Test Planning Using the Efficient Hydrologic Tracer-Test Design (Ehtd) Program (2005)

    EPA Science Inventory

    Hydrological tracer testing is the most reliable diagnostic technique available for establishing flow trajectories and hydrologic connections and for determining basic hydraulic and geometric parameters necessary for establishing operative solute-transport processes. Tracer-test ...

  6. Tracer-Test Planning Using the Efficient Hydrologic Tracer-Test Design (Ehtd) Program (2003)

    EPA Science Inventory

    Hydrological tracer testing is the most reliable diagnostic technique available for establishing flow trajectories and hydrologic connections and for determining basic hydraulic and geometric parameters necessary for establishing operative solute-transport processes. Tracer-test ...

  7. A Multi-Stage Longitudinal Comparative Design Stage II Evaluation of the Changing Lives Program: The Life Course Interview (RDA-LCI)

    ERIC Educational Resources Information Center

    Arango, Lisa Lewis; Kurtines, William M.; Montgomery, Marilyn J.; Ritchie, Rachel

    2008-01-01

    The study reported in this article, a Multi-Stage Longitudinal Comparative Design Stage II evaluation conducted as a planned preliminary efficacy evaluation (psychometric evaluation of measures, short-term controlled outcome studies, etc.) of the Changing Lives Program (CLP), provided evidence for the reliability and validity of the qualitative…

  8. The NASA computer science research program plan

    NASA Technical Reports Server (NTRS)

    1983-01-01

    A taxonomy of computer science is included, one state of the art of each of the major computer science categories is summarized. A functional breakdown of NASA programs under Aeronautics R and D, space R and T, and institutional support is also included. These areas were assessed against the computer science categories. Concurrent processing, highly reliable computing, and information management are identified.

  9. Joint Exercise Program: DOD Needs to Take Steps to Improve the Quality of Funding Data

    DTIC Science & Technology

    2017-02-01

    technology systems—the Joint Training Information Management System (JTIMS) and the Execution Management System—to manage the execution of the Joint...Exercise Program, but does not have assurance that funding execution data in the Execution Management System are reliable. JTIMS is the system of record...for the Joint Exercise Program that combatant commanders use to plan and manage their joint training exercises. GAO observed significant variation

  10. Rarity-weighted richness: a simple and reliable alternative to integer programming and heuristic algorithms for minimum set and maximum coverage problems in conservation planning.

    PubMed

    Albuquerque, Fabio; Beier, Paul

    2015-01-01

    Here we report that prioritizing sites in order of rarity-weighted richness (RWR) is a simple, reliable way to identify sites that represent all species in the fewest number of sites (minimum set problem) or to identify sites that represent the largest number of species within a given number of sites (maximum coverage problem). We compared the number of species represented in sites prioritized by RWR to numbers of species represented in sites prioritized by the Zonation software package for 11 datasets in which the size of individual planning units (sites) ranged from <1 ha to 2,500 km2. On average, RWR solutions were more efficient than Zonation solutions. Integer programming remains the only guaranteed way find an optimal solution, and heuristic algorithms remain superior for conservation prioritizations that consider compactness and multiple near-optimal solutions in addition to species representation. But because RWR can be implemented easily and quickly in R or a spreadsheet, it is an attractive alternative to integer programming or heuristic algorithms in some conservation prioritization contexts.

  11. Measuring infrastructure: A key step in program evaluation and planning

    PubMed Central

    Schmitt, Carol L.; Glasgow, LaShawn; Lavinghouze, S. Rene; Rieker, Patricia P.; Fulmer, Erika; McAleer, Kelly; Rogers, Todd

    2016-01-01

    State tobacco prevention and control programs (TCPs) require a fully functioning infrastructure to respond effectively to the Surgeon General’s call for accelerating the national reduction in tobacco use. The literature describes common elements of infrastructure; however, a lack of valid and reliable measures has made it difficult for program planners to monitor relevant infrastructure indicators and address observed deficiencies, or for evaluators to determine the association among infrastructure, program efforts, and program outcomes. The Component Model of Infrastructure (CMI) is a comprehensive, evidence-based framework that facilitates TCP program planning efforts to develop and maintain their infrastructure. Measures of CMI components were needed to evaluate the model’s utility and predictive capability for assessing infrastructure. This paper describes the development of CMI measures and results of a pilot test with nine state TCP managers. Pilot test findings indicate that the tool has good face validity and is clear and easy to follow. The CMI tool yields data that can enhance public health efforts in a funding-constrained environment and provides insight into program sustainability. Ultimately, the CMI measurement tool could facilitate better evaluation and program planning across public health programs. PMID:27037655

  12. Measuring infrastructure: A key step in program evaluation and planning.

    PubMed

    Schmitt, Carol L; Glasgow, LaShawn; Lavinghouze, S Rene; Rieker, Patricia P; Fulmer, Erika; McAleer, Kelly; Rogers, Todd

    2016-06-01

    State tobacco prevention and control programs (TCPs) require a fully functioning infrastructure to respond effectively to the Surgeon General's call for accelerating the national reduction in tobacco use. The literature describes common elements of infrastructure; however, a lack of valid and reliable measures has made it difficult for program planners to monitor relevant infrastructure indicators and address observed deficiencies, or for evaluators to determine the association among infrastructure, program efforts, and program outcomes. The Component Model of Infrastructure (CMI) is a comprehensive, evidence-based framework that facilitates TCP program planning efforts to develop and maintain their infrastructure. Measures of CMI components were needed to evaluate the model's utility and predictive capability for assessing infrastructure. This paper describes the development of CMI measures and results of a pilot test with nine state TCP managers. Pilot test findings indicate that the tool has good face validity and is clear and easy to follow. The CMI tool yields data that can enhance public health efforts in a funding-constrained environment and provides insight into program sustainability. Ultimately, the CMI measurement tool could facilitate better evaluation and program planning across public health programs. Copyright © 2016 Elsevier Ltd. All rights reserved.

  13. Aviation behavioral technology program cockpit human factors research plan

    DOT National Transportation Integrated Search

    1985-01-15

    The safety, reliability, and efficiency of the National Airspace System depend : upon the men and women who operate and use it. Aviation human factors : research is the study of how these people function in the performance of their : jobs as pilots, ...

  14. Automatic Fare Collection Equipment, Reliability and Maintainability Assessment Plan for Urban Rail Transit Properties

    DOT National Transportation Integrated Search

    1981-03-01

    This project was conducted as part of UMTA's Rail Transit Fare Collection Program developed by the Transportation Systems Center of the U.S. Department of Transportation. The report presents a generalized survey methodology for conducting assessments...

  15. State-of-the-practice in freight data : a review of available freight data in the U.S.

    DOT National Transportation Integrated Search

    2004-02-01

    State and regional transportation planning agencies are increasingly recognizing the need for : policies and programs addressing freight issues to ensure an efficient and reliable freight transportation : system. A major challenge, however, remains t...

  16. Aviation Behavioral Technology Program: Cockpit Human Factors Research Plan

    DOT National Transportation Integrated Search

    1985-01-15

    The safety, reliability, and efficiency of the National Airspace System depend upon the men and women who operate and use it. Aviation human factors research is the study of how these people function in the performance of their jobs as pilots, cont...

  17. NASA's Next Generation Launch Technology Program - Strategy and Plans

    NASA Technical Reports Server (NTRS)

    Hueter, Uwe

    2003-01-01

    The National Aeronautics and Space Administration established a new program office, Next Generation Launch Technology (NGLT) Program Office, last year to pursue technologies for future space launch systems. NGLT will fund research in key technology areas such as propulsion, launch vehicles, operations and system analyses. NGLT is part of NASA s Integrated Space Technology Plan. The NGLT Program is sponsored by NASA s Office of Aerospace Technology and is part of the Space Launch Initiative theme that includes both NGLT and Orbital Space Plane. NGLT will focus on technology development to increase safety and reliability and reduce overall costs associated with building, flying and maintaining the nation s next-generations of space launch vehicles. These investments will be guided by systems engineering and analysis with a focus on the needs of National customers.

  18. Space Station Freedom primary power wiring requirements

    NASA Technical Reports Server (NTRS)

    Hill, Thomas J.

    1994-01-01

    The Space Station Freedom (SSF) Program requirements are a 30 year reliable service life in low Earth orbit in hard vacuum or pressurized module service without detrimental degradation. Specific requirements are outlined in this presentation for SSF primary power and cable insulation. The primary power cable status and the WP-4 planned cable test program are also reviewed along with Rocketdyne-WP04 prime insulation candidates.

  19. The United Arab Emirates Nuclear Program and Proposed U.S. Nuclear Cooperation

    DTIC Science & Technology

    2009-07-17

    global efforts to prevent nuclear proliferation” and, “the establishment of reliable sources of nuclear fuel for future civilian light water reactors ...planned nuclear reactor or on handling spent reactor fuel. (...continued) May 4, 2008...contracting between U.S. firms and the UAE related to the UAE’s proposed nuclear program has already taken place. In August 2008, Virginia’s Thorium Power

  20. Goddard Technology Efforts to Improve Space Borne Laser Reliability

    NASA Technical Reports Server (NTRS)

    Heaps, William S.

    2006-01-01

    In an effort to reduce the risk, perceived and actual, of employing instruments containing space borne lasers NASA initiated the Laser Risk Reduction Program (LRRP) in 2001. This program managed jointly by NASA Langley and NASA Goddard and employing lasers researchers from government, university and industrial labs is nearing the conclusion of its planned 5 year duration. This paper will describe some of the efforts and results obtained by the Goddard half of the program.

  1. An enhanced reliability-oriented workforce planning model for process industry using combined fuzzy goal programming and differential evolution approach

    NASA Astrophysics Data System (ADS)

    Ighravwe, D. E.; Oke, S. A.; Adebiyi, K. A.

    2018-03-01

    This paper draws on the "human reliability" concept as a structure for gaining insight into the maintenance workforce assessment in a process industry. Human reliability hinges on developing the reliability of humans to a threshold that guides the maintenance workforce to execute accurate decisions within the limits of resources and time allocations. This concept offers a worthwhile point of deviation to encompass three elegant adjustments to literature model in terms of maintenance time, workforce performance and return-on-workforce investments. These fully explain the results of our influence. The presented structure breaks new grounds in maintenance workforce theory and practice from a number of perspectives. First, we have successfully implemented fuzzy goal programming (FGP) and differential evolution (DE) techniques for the solution of optimisation problem in maintenance of a process plant for the first time. The results obtained in this work showed better quality of solution from the DE algorithm compared with those of genetic algorithm and particle swarm optimisation algorithm, thus expressing superiority of the proposed procedure over them. Second, the analytical discourse, which was framed on stochastic theory, focusing on specific application to a process plant in Nigeria is a novelty. The work provides more insights into maintenance workforce planning during overhaul rework and overtime maintenance activities in manufacturing systems and demonstrated capacity in generating substantially helpful information for practice.

  2. The Development of Dynamic Human Reliability Analysis Simulations for Inclusion in Risk Informed Safety Margin Characterization Frameworks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jeffrey C. Joe; Diego Mandelli; Ronald L. Boring

    2015-07-01

    The United States Department of Energy is sponsoring the Light Water Reactor Sustainability program, which has the overall objective of supporting the near-term and the extended operation of commercial nuclear power plants. One key research and development (R&D) area in this program is the Risk-Informed Safety Margin Characterization pathway, which combines probabilistic risk simulation with thermohydraulic simulation codes to define and manage safety margins. The R&D efforts to date, however, have not included robust simulations of human operators, and how the reliability of human performance or lack thereof (i.e., human errors) can affect risk-margins and plant performance. This paper describesmore » current and planned research efforts to address the absence of robust human reliability simulations and thereby increase the fidelity of simulated accident scenarios.« less

  3. 40 CFR 57.405 - Formulation, approval, and implementation of requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... completion of the measures specified in the approved plan evaluating the performance and adequacy of the SCS.... The reliability study shall include a comprehensive analysis of the system's operation during one or... (CONTINUED) AIR PROGRAMS (CONTINUED) PRIMARY NONFERROUS SMELTER ORDERS Supplementary Control System...

  4. 40 CFR 57.405 - Formulation, approval, and implementation of requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... completion of the measures specified in the approved plan evaluating the performance and adequacy of the SCS.... The reliability study shall include a comprehensive analysis of the system's operation during one or... (CONTINUED) AIR PROGRAMS (CONTINUED) PRIMARY NONFERROUS SMELTER ORDERS Supplementary Control System...

  5. 40 CFR 57.405 - Formulation, approval, and implementation of requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... completion of the measures specified in the approved plan evaluating the performance and adequacy of the SCS.... The reliability study shall include a comprehensive analysis of the system's operation during one or... (CONTINUED) AIR PROGRAMS (CONTINUED) PRIMARY NONFERROUS SMELTER ORDERS Supplementary Control System...

  6. 40 CFR 57.405 - Formulation, approval, and implementation of requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... completion of the measures specified in the approved plan evaluating the performance and adequacy of the SCS.... The reliability study shall include a comprehensive analysis of the system's operation during one or... (CONTINUED) AIR PROGRAMS (CONTINUED) PRIMARY NONFERROUS SMELTER ORDERS Supplementary Control System...

  7. Analytical Approaches to Guide SLS Fault Management (FM) Development

    NASA Technical Reports Server (NTRS)

    Patterson, Jonathan D.

    2012-01-01

    Extensive analysis is needed to determine the right set of FM capabilities to provide the most coverage without significantly increasing the cost, reliability (FP/FN), and complexity of the overall vehicle systems. Strong collaboration with the stakeholders is required to support the determination of the best triggers and response options. The SLS Fault Management process has been documented in the Space Launch System Program (SLSP) Fault Management Plan (SLS-PLAN-085).

  8. Fuel cell systems program plan, FY 1990

    NASA Astrophysics Data System (ADS)

    1989-10-01

    A principal goal of the Office of Fossil Energy is to increase the utilization of domestic fuels in an environmentally benign manner, through the development and transfer to the private sector of advanced energy conversion technology. Successful efforts to achieve this goal contribute to the stability and reliability of reasonably priced energy supplies, enhance the competitiveness of domestic fuels and energy technologies in domestic and international markets, and contribute to the development of cost effective strategies for control of acid rain and global warming. Several advanced energy conversion technologies are now under development by DOE which can help to achieve these objectives. Fuel cells are among those technologies. This report briefly describes fuel cell technology and the program plan of U.S. DOE fuel cell program.

  9. National Rocket Propulsion Materials Plan: A NASA, Department of Defense, and Industry Partnership

    NASA Technical Reports Server (NTRS)

    Clinton, Raymond G., Jr.; Munafo, Paul M. (Technical Monitor)

    2001-01-01

    NASA, Department of Defense, and rocket propulsion industry representatives are working together to create a national rocket propulsion materials development roadmap. This "living document" will facilitate collaboration among the partners, leveraging of resources, and will be a highly effective tool for technology development planning. The structuring of the roadmap, and development plan, which will combine the significant efforts of the Integrated High Payoff Rocket Propulsion Technology (IHPRPT) Program, and NASA's Integrated Space Transportation Plan (ISTP), is being lead by the IHPRPT Materials Working Group (IMWG). The IHPRPT Program is a joint DoD, NASA, and industry effort to dramatically improve the nation's rocket propulsion capabilities. This phased program is structured with increasingly challenging goals focused on performance, reliability, and cost to effectively double rocket propulsion capabilities by 2010. The IHPRPT program is focused on three propulsion application areas: Boost and Orbit Transfer (both liquid rocket engines and solid rocket motors), Tactical, and Spacecraft. Critical to the success of this initiative is the development and application of advanced materials, processes, and manufacturing technologies. NASA's ISTP is a comprehensive strategy focusing on the aggressive safety, reliability, and affordability goals for future space transportation systems established by the agency. Key elements of this plan are the 2 nd and 3 d Generation Reusable Launch Vehicles (RLV). The affordability and safety goals of these generational systems are, respectively, 10X cheaper and 100X safer by 2010, and 100X cheaper and 10,000X safer by 2025. Accomplishment of these goals requires dramatic and sustained breakthroughs, particularly in the development and the application of advanced material systems. The presentation will provide an overview of the IHPRPT materials initiatives, NASA's 2nd and 3 rd Generation RLV propulsion materials projects, and the approach for the development of the national rocket propulsion materials roadmap.

  10. The NASA-Lewis/ERDA solar heating and cooling technology program. [project planning/energy policy

    NASA Technical Reports Server (NTRS)

    Couch, J. P.; Bloomfield, H. S.

    1975-01-01

    Plans by NASA to carry out a major role in a solar heating and cooling program are presented. This role would be to create and test the enabling technology for future solar heating, cooling, and combined heating/cooling systems. The major objectives of the project are to achieve reduction in solar energy system costs, while maintaining adequate performance, reliability, life, and maintenance characteristics. The project approach is discussed, and will be accomplished principally by contract with industry to develop advanced components and subsystems. Advanced hardware will be tested to establish 'technology readiness' both under controlled laboratory conditions and under real sun conditions.

  11. A high-fidelity satellite ephemeris program for Earth satellites in eccentric orbits

    NASA Technical Reports Server (NTRS)

    Simmons, David R.

    1990-01-01

    A program for mission planning called the Analytic Satellite Ephemeris Program (ASEP), produces projected data for orbits that remain fairly close to the Earth. ASEP does not take into account lunar and solar perturbations. These perturbations are accounted for in another program called GRAVE, which incorporates more flexible means of input for initial data, provides additional kinds of output information, and makes use of structural programming techniques to make the program more understandable and reliable. GRAVE was revised, and a new program called ORBIT was developed. It is divided into three major phases: initialization, integration, and output. Results of the program development are presented.

  12. Task-level robot programming: Integral part of evolution from teleoperation to autonomy

    NASA Technical Reports Server (NTRS)

    Reynolds, James C.

    1987-01-01

    An explanation is presented of task-level robot programming and of how it differs from the usual interpretation of task planning for robotics. Most importantly, it is argued that the physical and mathematical basis of task-level robot programming provides inherently greater reliability than efforts to apply better known concepts from artificial intelligence (AI) to autonomous robotics. Finally, an architecture is presented that allows the integration of task-level robot programming within an evolutionary, redundant, and multi-modal framework that spans teleoperation to autonomy.

  13. Reliability Programs for Nonelectronic Designs. Volume 2

    DTIC Science & Technology

    1983-04-01

    afforded. Differ- ences between critical and minor failures must be defined in the RFP so that the test need not be stopped for minor failures. However...not be afforded. Specialized test plans must be developed for nonelectronic equipment. First, differences between critical and minor failures must be...determined prior to initiating the test program so that the test need not be stopped for minor failures. Second, although the test must be interrupted

  14. Testing of Twin Linear Aerospike XRS-2200 Engine

    NASA Technical Reports Server (NTRS)

    2001-01-01

    The test of twin Linear Aerospike XRS-2200 engines, originally built for the X-33 program, was performed on August 6, 2001 at NASA's Sternis Space Center, Mississippi. The engines were fired for the planned 90 seconds and reached a planned maximum power of 85 percent. NASA's Second Generation Reusable Launch Vehicle Program , also known as the Space Launch Initiative (SLI), is making advances in propulsion technology with this third and final successful engine hot fire, designed to test electro-mechanical actuators. Information learned from this hot fire test series about new electro-mechanical actuator technology, which controls the flow of propellants in rocket engines, could provide key advancements for the propulsion systems for future spacecraft. The Second Generation Reusable Launch Vehicle Program, led by NASA's Marshall Space Flight Center in Huntsville, Alabama, is a technology development program designed to increase safety and reliability while reducing costs for space travel. The X-33 program was cancelled in March 2001.

  15. Research Technology

    NASA Image and Video Library

    2001-08-06

    The test of twin Linear Aerospike XRS-2200 engines, originally built for the X-33 program, was performed on August 6, 2001 at NASA's Sternis Space Center, Mississippi. The engines were fired for the planned 90 seconds and reached a planned maximum power of 85 percent. NASA's Second Generation Reusable Launch Vehicle Program , also known as the Space Launch Initiative (SLI), is making advances in propulsion technology with this third and final successful engine hot fire, designed to test electro-mechanical actuators. Information learned from this hot fire test series about new electro-mechanical actuator technology, which controls the flow of propellants in rocket engines, could provide key advancements for the propulsion systems for future spacecraft. The Second Generation Reusable Launch Vehicle Program, led by NASA's Marshall Space Flight Center in Huntsville, Alabama, is a technology development program designed to increase safety and reliability while reducing costs for space travel. The X-33 program was cancelled in March 2001.

  16. Sex education and family planning services for young adults: alternative urban strategies in Mexico.

    PubMed

    Townsend, J W; Diaz de May, E; Sepúlveda, Y; Santos de Garza, Y; Rosenhouse, S

    1987-01-01

    In Mexico, youth face difficulties in obtaining reliable information on sex education and family planning through existing community programs. Two alternative strategies to provide these services are being tested in poor urban areas of Monterrey. In one experimental area, Integrated Youth Centers were established, which provide sex education and family planning services as well as counseling, academic tutoring, and recreational activities. In another area, trained young adults and community counselors work through informal networks to provide sex education and family planning information. Both utilization and the cost of these services are examined in the context of plans for expanding coverage in Mexico-U.S. border areas.

  17. Lunar Regenerative Fuel Cell (RFC) Reliability Testing for Assured Mission Success

    NASA Technical Reports Server (NTRS)

    Bents, David J.

    2009-01-01

    NASA's Constellation program has selected the closed cycle hydrogen oxygen Polymer Electrolyte Membrane (PEM) Regenerative Fuel Cell (RFC) as its baseline solar energy storage system for the lunar outpost and manned rover vehicles. Since the outpost and manned rovers are "human-rated," these energy storage systems will have to be of proven reliability exceeding 99 percent over the length of the mission. Because of the low (TRL=5) development state of the closed cycle hydrogen oxygen PEM RFC at present, and because there is no equivalent technology base in the commercial sector from which to draw or infer reliability information from, NASA will have to spend significant resources developing this technology from TRL 5 to TRL 9, and will have to embark upon an ambitious reliability development program to make this technology ready for a manned mission. Because NASA would be the first user of this new technology, NASA will likely have to bear all the costs associated with its development.When well-known reliability estimation techniques are applied to the hydrogen oxygen RFC to determine the amount of testing that will be required to assure RFC unit reliability over life of the mission, the analysis indicates the reliability testing phase by itself will take at least 2 yr, and could take up to 6 yr depending on the number of QA units that are built and tested and the individual unit reliability that is desired. The cost and schedule impacts of reliability development need to be considered in NASA's Exploration Technology Development Program (ETDP) plans, since life cycle testing to build meaningful reliability data is the only way to assure "return to the moon, this time to stay, then on to Mars" mission success.

  18. An inexact chance-constrained programming model for water quality management in Binhai New Area of Tianjin, China.

    PubMed

    Xie, Y L; Li, Y P; Huang, G H; Li, Y F; Chen, L R

    2011-04-15

    In this study, an inexact-chance-constrained water quality management (ICC-WQM) model is developed for planning regional environmental management under uncertainty. This method is based on an integration of interval linear programming (ILP) and chance-constrained programming (CCP) techniques. ICC-WQM allows uncertainties presented as both probability distributions and interval values to be incorporated within a general optimization framework. Complexities in environmental management systems can be systematically reflected, thus applicability of the modeling process can be highly enhanced. The developed method is applied to planning chemical-industry development in Binhai New Area of Tianjin, China. Interval solutions associated with different risk levels of constraint violation have been obtained. They can be used for generating decision alternatives and thus help decision makers identify desired policies under various system-reliability constraints of water environmental capacity of pollutant. Tradeoffs between system benefits and constraint-violation risks can also be tackled. They are helpful for supporting (a) decision of wastewater discharge and government investment, (b) formulation of local policies regarding water consumption, economic development and industry structure, and (c) analysis of interactions among economic benefits, system reliability and pollutant discharges. Copyright © 2011 Elsevier B.V. All rights reserved.

  19. Earth Observing System (EOS) Advanced Microwave Sounding Unit-A (AMSU-A) Spares Program Plan

    NASA Technical Reports Server (NTRS)

    Chapman, Weldon

    1994-01-01

    This plan specifies the spare components to be provided for the EOS/AMSU-A instrument and the general spares philosophy for their procurement. It also address key components not recommended for spares, as well as the schedule and method for obtaining the spares. The selected spares list was generated based on component criticality, reliability, repairability, and availability. An alternative spares list is also proposed based on more stringent fiscal constraints.

  20. Human Research Program Integrated Research Plan. Revision A January 2009

    NASA Technical Reports Server (NTRS)

    2009-01-01

    The Integrated Research Plan (IRP) describes the portfolio of Human Research Program (HRP) research and technology tasks. The IRP is the HRP strategic and tactical plan for research necessary to meet HRP requirements. The need to produce an IRP is established in HRP-47052, Human Research Program - Program Plan, and is under configuration management control of the Human Research Program Control Board (HRPCB). Crew health and performance is critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological and behavioral effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes HRP s approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and how they are integrated to provide a risk mitigation tool. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.

  1. Transportation technology program: Strategic plan

    NASA Astrophysics Data System (ADS)

    1991-09-01

    The purpose of this report is to define the technology program required to meet the transportation technology needs for current and future civil space missions. It is a part of an integrated plan, prepared by NASA in part in response to the Augustine Committee recommendations, to describe and advocate expanded and more aggressive efforts in the development of advanced space technologies. This expanded program will provide a technology basis for future space missions to which the U.S. aspires, and will help to regain technology leadership for the U.S. on a broader front. The six aspects of this integrated program/plan deal with focused technologies to support space sciences, exploration, transportation, platforms, and operations as well as provide a Research and Technology Base Program. This volume describes the technologies needed to support transportation systems, e.g., technologies needed for upgrades to current transportation systems and to provide reliable and efficient transportation for future space missions. The Office of Aeronautics, Exploration, and Technology (OAET) solicited technology needs from the major agency technology users and the aerospace industry community and formed a transportation technology team (appendix A) to develop a technology program to respond to those needs related to transportation technologies. This report addresses the results of that team activity. It is a strategic plan intended for use as a planning document rather than as a project management tool. It is anticipated that this document will be primarily utilized by research & technology (R&T) management at the various NASA Centers as well as by officials at NASA Headquarters and by industry in planning their corporate Independent Research and Development (IR&D) investments.

  2. Transportation technology program: Strategic plan

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The purpose of this report is to define the technology program required to meet the transportation technology needs for current and future civil space missions. It is a part of an integrated plan, prepared by NASA in part in response to the Augustine Committee recommendations, to describe and advocate expanded and more aggressive efforts in the development of advanced space technologies. This expanded program will provide a technology basis for future space missions to which the U.S. aspires, and will help to regain technology leadership for the U.S. on a broader front. The six aspects of this integrated program/plan deal with focused technologies to support space sciences, exploration, transportation, platforms, and operations as well as provide a Research and Technology Base Program. This volume describes the technologies needed to support transportation systems, e.g., technologies needed for upgrades to current transportation systems and to provide reliable and efficient transportation for future space missions. The Office of Aeronautics, Exploration, and Technology (OAET) solicited technology needs from the major agency technology users and the aerospace industry community and formed a transportation technology team (appendix A) to develop a technology program to respond to those needs related to transportation technologies. This report addresses the results of that team activity. It is a strategic plan intended for use as a planning document rather than as a project management tool. It is anticipated that this document will be primarily utilized by research & technology (R&T) management at the various NASA Centers as well as by officials at NASA Headquarters and by industry in planning their corporate Independent Research and Development (IR&D) investments.

  3. Quantifying the process and outcomes of person-centered planning.

    PubMed

    Holburn, S; Jacobson, J W; Vietze, P M; Schwartz, A A; Sersen, E

    2000-09-01

    Although person-centered planning is a popular approach in the field of developmental disabilities, there has been little systematic assessment of its process and outcomes. To measure person-centered planning, we developed three instruments designed to assess its various aspects. We then constructed variables comprising both a Process and an Outcome Index using a combined rational-empirical method. Test-retest reliability and measures of internal consistency appeared adequate. Variable correlations and factor analysis were generally consistent with our conceptualization and resulting item and variable classifications. Practical implications for intervention integrity, program evaluation, and organizational performance are discussed.

  4. Nutrition Knowledge and Training Needs in the School Environment

    NASA Astrophysics Data System (ADS)

    Jones, Anna Marie

    The nutrition environment in schools can influence the risk for childhood overweight and obesity, which in turn can have life-long implications for risk of chronic disease. This dissertation aimed to examine the nutrition environment in primary public schools in California with regards to the amount of nutrition education provided in the classroom, the nutrition knowledge of teachers, and the training needs of school nutrition personnel. In order to determine nutrition knowledge of teachers, a valid and reliable questionnaire was developed to assess knowledge. The systematic process involved cognitive interviews, a mail-based pretest that utilized a random sample of addresses in California, and validity and reliability testing in a sample of university students. Results indicated that the questionnaire had adequate construct validity, internal consistency reliability, and test-retest reliability. Following the validation of the knowledge questionnaire, it was used in a study of public school teachers in California to determine the relationship between demographic and classroom characteristics and nutrition knowledge, in addition to barriers to nutrition education and resources used to plan nutrition lessons. Nutrition knowledge was not found to be associated with teaching nutrition in the classroom, however it was associated with gender, identifying as Hispanic or Latino, and grade level grouping taught. The most common barriers to nutrition education were time, and unrelated subject matter. The most commonly used resources to plan nutrition lessons were Dairy Council of California educational materials. The school nutrition program was the second area of the school nutrition environment to be examined, and the primary focus was to determine the perceived training needs of California school nutrition personnel. Respondents indicated a need for training in topics related to: program management; the Healthy, Hunger-Free Kids Act of 2010; nutrition, health and wellness; planning, preparing, and serving meals; and communication and marketing. Those employed in residential child care institutions expressed a strong need for training specific to this type of program. Overall, the results of this dissertation contribute to the body of knowledge about nutrition in the school environment and raise interesting questions to be examined in future studies.

  5. Analysis of the Multi Strategy Goal Programming for Micro-Grid Based on Dynamic ant Genetic Algorithm

    NASA Astrophysics Data System (ADS)

    Qiu, J. P.; Niu, D. X.

    Micro-grid is one of the key technologies of the future energy supplies. Take economic planning. reliability, and environmental protection of micro grid as a basis for the analysis of multi-strategy objective programming problems for micro grid which contains wind power, solar power, and battery and micro gas turbine. Establish the mathematical model of each power generation characteristics and energy dissipation. and change micro grid planning multi-objective function under different operating strategies to a single objective model based on AHP method. Example analysis shows that in combination with dynamic ant mixed genetic algorithm can get the optimal power output of this model.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vanderwiel, Scott A; Wilson, Alyson G; Graves, Todd L

    Both the U. S. Department of Defense (DoD) and Department of Energy (DOE) maintain weapons stockpiles: items like bullets, missiles and bombs that have already been produced and are being stored until needed. Ideally, these stockpiles maintain high reliability over time. To assess reliability, a surveillance program is implemented, where units are periodically removed from the stockpile and tested. The most definitive tests typically destroy the weapons so a given unit is tested only once. Surveillance managers need to decide how many units should be tested, how often they should be tested, what tests should be done, and how themore » resulting data are used to estimate the stockpile's current and future reliability. These issues are particularly critical from a planning perspective: given what has already been observed and our understanding of the mechanisms of stockpile aging, what is an appropriate and cost-effective surveillance program? Surveillance programs are costly, broad, and deep, especially in the DOE, where the US nuclear weapons surveillance program must 'ensure, through various tests, that the reliability of nuclear weapons is maintained' in the absence of full-system testing (General Accounting Office, 1996). The DOE program consists primarily of three types of tests: nonnuclear flight tests, that involve the actual dropping or launching of a weapon from which the nuclear components have been removed; and nonnuclear and nuclear systems laboratory tests, which detect defects due to aging, manufacturing, and design of the nonnuclear and nuclear portions of the weapons. Fully integrated analysis of the suite of nuclear weapons surveillance data is an ongoing area of research (Wilson et al., 2007). This paper introduces a simple model that captures high-level features of stockpile reliability over time and can be used to answer broad policy questions about surveillance programs. Our intention is to provide a framework that generates tractable answers that integrate expert knowledge and high-level summaries of surveillance data to allow decision-making about appropriate trade-offs between the cost of data and the precision of stockpile reliability estimates.« less

  7. The Practice of Health Program Evaluation.

    PubMed

    Lewis, Sarah R

    2017-11-01

    The Practice of Health Program Evaluation provides an overview of the evaluation process for public health programs while diving deeper to address select advanced concepts and techniques. The book unfolds evaluation as a three-phased process consisting of identification of evaluation questions, data collection and analysis, and dissemination of results and recommendations. The text covers research design, sampling methods, as well as quantitative and qualitative approaches. Types of evaluation are also discussed, including economic assessment and systems research as relative newcomers. Aspects critical to conducting a successful evaluation regardless of type or research design are emphasized, such as stakeholder engagement, validity and reliability, and adoption of sound recommendations. The book encourages evaluators to document their approach by developing an evaluation plan, a data analysis plan, and a dissemination plan, in order to help build consensus throughout the process. The evaluative text offers a good bird's-eye view of the evaluation process, while offering guidance for evaluation experts on how to navigate political waters and advocate for their findings to help affect change.

  8. Task 1 Report - Assessment of Data Availability to Inform Energy Planning Analyses: Energy Alternatives Study for the Lao People's Democratic Republic: Smart Infrastructure for the Mekong Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, Nathan; Lopez, Anthony J.; Katz, Jessica R.

    In an effort to address concerns such as energy security, reliability, affordability, and other objectives, the Government of the Lao People's Democratic Republic (Lao PDR) is seeking to advance its expertise and experience in energy system analysis and planning to explore energy alternatives. Assessing the potential and alternatives for deploying energy technology options is often an early step - and, in most cases, an ongoing process - in planning for the development of the energy sector as a whole. Reliable and robust data are crucial to conducting these types of planning-related analyses in a transparent manner that builds confidence amongmore » power sector stakeholders and encourages investment in future energy project development and infrastructure opportunities. This report represents the first output of the Energy Alternatives Study for the Lao PDR (Energy Alternatives Study), a collaboration between Ministry of Energy and Mines and the United States Agency for International Development (USAID) under the auspices of the Smart Infrastructure for the Mekong (SIM) program. The Energy Alternatives Study includes five tasks that build upon each other to meet the goal of the project. The report summarizes the availability, quality, and accessibility of data that serve as key inputs to energy planning activities for the power sector. The purpose of this data assessment is two-fold: 1. To facilitate the informed use of existing data by highlighting applications for these data as they relate to priority energy planning analyses; and 2. To inform future investments in energy data collection and management by identifying significant data gaps and providing guidance on how to fill these gaps.« less

  9. Development and Psychometric Testing of the Caregiver Communication Competence Scale in Patients With Dementia.

    PubMed

    Chao, Hui-Chen; Yang, Ya-Ping; Huang, Mei-Chih; Wang, Jing-Jy

    2016-01-01

    Appropriate communication skills are essential for understanding patient needs, particularly those of patients with dementia. Assessing health care providers' competence in communicating with patients with dementia is critical for planning a communication education program. However, no formally established scale can be used. The purpose of the current study was to develop a valid and reliable instrument for determining the communication competence of health care providers with patients with dementia. Through use of a literature review and previous clinical experience, an initial 28-item scale was developed to assess the frequency of use of each item by health care providers. Fourteen items were extracted and three factors were distinguished. Results indicated that the internal consistency reliability of the 14-item scale was 0.84. Favorable convergent and discriminant validities were reached. The communication competence scale provides administrators or educators with a useful tool for assessing communication competence of health care providers when interacting with patients with dementia so a suitable education program can be planned and implemented. Copyright 2016, SLACK Incorporated.

  10. Maximizing Energy Savings Reliability in BC Hydro Industrial Demand-side Management Programs: An Assessment of Performance Incentive Models

    NASA Astrophysics Data System (ADS)

    Gosman, Nathaniel

    For energy utilities faced with expanded jurisdictional energy efficiency requirements and pursuing demand-side management (DSM) incentive programs in the large industrial sector, performance incentive programs can be an effective means to maximize the reliability of planned energy savings. Performance incentive programs balance the objectives of high participation rates with persistent energy savings by: (1) providing financial incentives and resources to minimize constraints to investment in energy efficiency, and (2) requiring that incentive payments be dependent on measured energy savings over time. As BC Hydro increases its DSM initiatives to meet the Clean Energy Act objective to reduce at least 66 per cent of new electricity demand with DSM by 2020, the utility is faced with a higher level of DSM risk, or uncertainties that impact the costeffective acquisition of planned energy savings. For industrial DSM incentive programs, DSM risk can be broken down into project development and project performance risks. Development risk represents the project ramp-up phase and is the risk that planned energy savings do not materialize due to low customer response to program incentives. Performance risk represents the operational phase and is the risk that planned energy savings do not persist over the effective measure life. DSM project development and performance risks are, in turn, a result of industrial economic, technological and organizational conditions, or DSM risk factors. In the BC large industrial sector, and characteristic of large industrial sectors in general, these DSM risk factors include: (1) capital constraints to investment in energy efficiency, (2) commodity price volatility, (3) limited internal staffing resources to deploy towards energy efficiency, (4) variable load, process-based energy saving potential, and (5) a lack of organizational awareness of an operation's energy efficiency over time (energy performance). This research assessed the capacity of alternative performance incentive program models to manage DSM risk in BC. Three performance incentive program models were assessed and compared to BC Hydro's current large industrial DSM incentive program, Power Smart Partners -- Transmission Project Incentives, itself a performance incentive-based program. Together, the selected program models represent a continuum of program design and implementation in terms of the schedule and level of incentives provided, the duration and rigour of measurement and verification (M&V), energy efficiency measures targeted and involvement of the private sector. A multi criteria assessment framework was developed to rank the capacity of each program model to manage BC large industrial DSM risk factors. DSM risk management rankings were then compared to program costeffectiveness, targeted energy savings potential in BC and survey results from BC industrial firms on the program models. The findings indicate that the reliability of DSM energy savings in the BC large industrial sector can be maximized through performance incentive program models that: (1) offer incentives jointly for capital and low-cost operations and maintenance (O&M) measures, (2) allow flexible lead times for project development, (3) utilize rigorous M&V methods capable of measuring variable load, process-based energy savings, (4) use moderate contract lengths that align with effective measure life, and (5) integrate energy management software tools capable of providing energy performance feedback to customers to maximize the persistence of energy savings. While this study focuses exclusively on the BC large industrial sector, the findings of this research have applicability to all energy utilities serving large, energy intensive industrial sectors.

  11. Development and Validity Testing of the Worksite Health Index: An Assessment Tool to Help and Improve Korean Employees' Health-Related Outcome.

    PubMed

    Yun, Young Ho; Sim, Jin Ah; Lim, Ye Jin; Lim, Cheol Il; Kang, Sung-Choon; Kang, Joon-Ho; Park, Jun Dong; Noh, Dong Young

    2016-06-01

    The objective of this study was to develop the Worksite Health Index (WHI) and validate its psychometric properties. The development of the WHI questionnaire included item generation, item construction, and field testing. To assess the instrument's reliability and validity, we recruited 30 different Korean worksites. We developed the WHI questionnaire of 136 items categorized into five domains, namely Governance and Infrastructure, Need Assessment and Planning, Health Prevention and Promotion Program, Occupational Safety, and Monitoring and Feedback. All WHI domains demonstrated a high reliability with good internal consistency. The total WHI scores differentiated worksite groups effectively according to firm size. Each domain was associated significantly with employees' health status, absence, and financial outcome. The WHI can assess comprehensive worksite health programs. This tool is publicly available for addressing the growing need for worksite health programs.

  12. Sensitivity-Informed De Novo Programming for Many-Objective Water Portfolio Planning Under Uncertainty

    NASA Astrophysics Data System (ADS)

    Kasprzyk, J. R.; Reed, P. M.; Kirsch, B. R.; Characklis, G. W.

    2009-12-01

    Risk-based water supply management presents severe cognitive, computational, and social challenges to planning in a changing world. Decision aiding frameworks must confront the cognitive biases implicit to risk, the severe uncertainties associated with long term planning horizons, and the consequent ambiguities that shape how we define and solve water resources planning and management problems. This paper proposes and demonstrates a new interactive framework for sensitivity informed de novo programming. The theoretical focus of our many-objective de novo programming is to promote learning and evolving problem formulations to enhance risk-based decision making. We have demonstrated our proposed de novo programming framework using a case study for a single city’s water supply in the Lower Rio Grande Valley (LRGV) in Texas. Key decisions in this case study include the purchase of permanent rights to reservoir inflows and anticipatory thresholds for acquiring transfers of water through optioning and spot leases. A 10-year Monte Carlo simulation driven by historical data is used to provide performance metrics for the supply portfolios. The three major components of our methodology include Sobol globoal sensitivity analysis, many-objective evolutionary optimization and interactive tradeoff visualization. The interplay between these components allows us to evaluate alternative design metrics, their decision variable controls and the consequent system vulnerabilities. Our LRGV case study measures water supply portfolios’ efficiency, reliability, and utilization of transfers in the water supply market. The sensitivity analysis is used interactively over interannual, annual, and monthly time scales to indicate how the problem controls change as a function of the timescale of interest. These results have been used then to improve our exploration and understanding of LRGV costs, vulnerabilities, and the water portfolios’ critical reliability constraints. These results demonstrate how we can adaptively improve the value and robustness of our problem formulations by evolving our definition of optimality to discover key tradeoffs.

  13. 77 FR 53884 - Automatic Underfrequency Load Shedding and Load Shedding Plans Reliability Standards; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ... Underfrequency Load Shedding and Load Shedding Plans Reliability Standards; Notice of Compliance Filing Take notice that on August 9, 2012, North American Electric Reliability Corporation submitted a compliance... Load Shedding Plans Reliability Standards, 139 FERC ] 61,098, (Order No. 763) (2012). Any person...

  14. Formulation of consumables management models. Development approach for the mission planning processor working model

    NASA Technical Reports Server (NTRS)

    Connelly, L. C.

    1977-01-01

    The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. The approach to be used in developing a working model of the mission planning processor is documented. The approach includes top-down design, structured programming techniques, and application of NASA approved software development standards. This development approach: (1) promotes cost effective software development, (2) enhances the quality and reliability of the working model, (3) encourages the sharing of the working model through a standard approach, and (4) promotes portability of the working model to other computer systems.

  15. Light Water Reactor Sustainability Program Advanced Instrumentation, Information, and Control Systems Technologies Technical Program Plan for FY 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hallbert, Bruce Perry; Thomas, Kenneth David

    2015-10-01

    Reliable instrumentation, information, and control (II&C) systems technologies are essential to ensuring safe and efficient operation of the U.S. light water reactor (LWR) fleet. These technologies affect every aspect of nuclear power plant (NPP) and balance-of-plant operations. In 1997, the National Research Council conducted a study concerning the challenges involved in modernization of digital instrumentation and control systems in NPPs. Their findings identified the need for new II&C technology integration.

  16. Assess program: Interactive data management systems for airborne research

    NASA Technical Reports Server (NTRS)

    Munoz, R. M.; Reller, J. O., Jr.

    1974-01-01

    Two data systems were developed for use in airborne research. Both have distributed intelligence and are programmed for interactive support among computers and with human operators. The C-141 system (ADAMS) performs flight planning and telescope control functions in addition to its primary role of data acquisition; the CV-990 system (ADDAS) performs data management functions in support of many research experiments operating concurrently. Each system is arranged for maximum reliability in the first priority function, precision data acquisition.

  17. NASA presentation. [wind energy conversion systems planning

    NASA Technical Reports Server (NTRS)

    Thomas, R. L.

    1973-01-01

    The development of a wind energy system is outlined that supplies reliable energy at a cost competitive with other energy systems. A government directed industry program with strong university support is recommended that includes meteorological studies to estimate wind energy potentials and determines favorable regions and sites for wind power installations. Key phases of the overall program are wind energy conversion systems, meteorological wind studies, energy storage systems, and environmental impact studies. Performance testing with a prototype wind energy conversion and storage system is projected for Fiscal 1977.

  18. Crane Cell Testing Support of Nasa/goddard Space Flight Center: an Update

    NASA Technical Reports Server (NTRS)

    Strawn, Mike; David, Jerry; Rao, Gopalakrishna M.

    2001-01-01

    The objective of this paper is to verify the quality and reliability of aerospace battery cells and batteries for NASA flight programs, disseminate the data - to develop a plan for in-orbit battery management - to design a cell/battery for future NASA spacecraft and establish a cell test data base for rechargeable cell/batteries.

  19. Using Landsat imagery and FIA data to examine wood supply uncertainty

    Treesearch

    Curtis A. Collins; Ruth C. Seawell

    2009-01-01

    As members of the forest products industry continue to reduce their landholdings, monitoring reliable future timber supplies becomes an increasingly important issue. This issue requires both spatial and forest inventory information to meet the strategic planning needs of these entities. Increased depth in the archival span of imagery available from the Landsat program...

  20. Report on the Formal Trialling of the Australian Second Language Proficiency Ratings (ASLPR).

    ERIC Educational Resources Information Center

    Ingram, D. E.

    Results of testing the validity and reliability of the Australian second language proficiency ratings (ASLPR) are presented. In addition to providing a framework for planning English as a second language programs for immigrants to Australia, the ASLPR was developed to specify second language proficiency in terms of practical language skills. The…

  1. Operations planning and analysis handbook for NASA/MSFC phase B development projects

    NASA Technical Reports Server (NTRS)

    Batson, Robert C.

    1986-01-01

    Current operations planning and analysis practices on NASA/MSFC Phase B projects were investigated with the objectives of (1) formalizing these practices into a handbook and (2) suggesting improvements. The study focused on how Science and Engineering (S&E) Operational Personnel support Program Development (PD) Task Teams. The intimate relationship between systems engineering and operations analysis was examined. Methods identified for use by operations analysts during Phase B include functional analysis, interface analysis methods to calculate/allocate such criteria as reliability, Maintainability, and operations and support cost.

  2. Strategic avionics technology planning

    NASA Technical Reports Server (NTRS)

    Cox, Kenneth J.; Brown, Don C.

    1991-01-01

    NASA experience in development and insertion of technology into programs had led to a recognition that a Strategic Plan for Avionics is needed for space. In the fall of 1989 an Avionics Technology Symposium was held in Williamsburg, Virginia. In early 1990, as a followon, a NASA wide Strategic Avionics Technology Working Group was chartered by NASA Headquarters. This paper will describe the objectives of this working group, technology bridging, and approaches to incentivize both the federal and commercial sectors to move toward rapidly developed, simple, and reliable systems with low life cycle cost.

  3. Reliability assessment of Multichip Module technologies via the Triservice/NASA RELTECH program

    NASA Astrophysics Data System (ADS)

    Fayette, Daniel F.

    1994-10-01

    Multichip Module (MCM) packaging/interconnect technologies have seen increased emphasis from both the commercial and military communities as a means of increasing capability and performance while providing a vehicle for reducing cost, power and weight of the end item electronic application. This is accomplished through three basic Multichip module technologies, MCM-L that are laminates, MCM-C that are ceramic type substrates and MCM-D that are deposited substrates (e.g., polymer dielectric with thin film metals). Three types of interconnect structures are also used with these substrates and include, wire bond, Tape Automated Bonds (TAB) and flip chip ball bonds. Application, cost, producibility and reliability are the drivers that will determine which MCM technology will best fit a respective need or requirement. With all the benefits and technologies cited, it would be expected that the use of, or the planned use of, MCM's would be more extensive in both military and commercial applications. However, two significant roadblocks exist to implementation of these new technologies: the absence of reliability data and a single national standard for the procurement of reliable/quality MCM's. To address the preceding issues, the Reliability Technology to Achieve Insertion of Advanced Packaging (RELTECH) program has been established. This program, which began in May 1992, has endeavored to evaluate a cross section of MCM technologies covering all classes of MCM's previously cited. NASA and the Tri-Services (Air Force Rome Laboratory, Naval Surface Warfare Center, Crane IN and Army Research Laboratory) have teamed together with sponsorship from ARPA to evaluate the performance, reliability and producibility of MCM's for both military and commercial usage. This is done in close cooperation with our industry partners whose support is critical to the goals of the program. Several tasks are being performed by the RELTECH program and data from this effort, in conjunction with information from our industry partners as well as discussions with industry organizations (IPC, EIA, ISHM, etc.) are being used to develop the qualification and screening requirements for MCM's. Specific tasks being performed by the RELTECH program include technical assessments, product evaluations, reliability modeling, environmental testing, and failure analysis. This paper will describe the various tasks associated with the RELTECH program, status, progress and a description of the national dual use specification being developed for MCM technologies.

  4. Systems Integration Fact Sheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2016-06-01

    This fact sheet is an overview of the Systems Integration subprogram at the U.S. Department of Energy SunShot Initiative. The Systems Integration subprogram enables the widespread deployment of safe, reliable, and cost-effective solar energy technologies by addressing the associated technical and non-technical challenges. These include timely and cost-effective interconnection procedures, optimal system planning, accurate prediction of solar resources, monitoring and control of solar power, maintaining grid reliability and stability, and many more. To address the challenges associated with interconnecting and integrating hundreds of gigawatts of solar power onto the electricity grid, the Systems Integration program funds research, development, and demonstrationmore » projects in four broad, interrelated focus areas: grid performance and reliability, dispatchability, power electronics, and communications.« less

  5. Neon reduction program on Cymer ArF light sources

    NASA Astrophysics Data System (ADS)

    Kanawade, Dinesh; Roman, Yzzer; Cacouris, Ted; Thornes, Josh; O'Brien, Kevin

    2016-03-01

    In response to significant neon supply constraints, Cymer has responded with a multi-part plan to support its customers. Cymer's primary objective is to ensure that reliable system performance is maintained while minimizing gas consumption. Gas algorithms were optimized to ensure stable performance across all operating conditions. The Cymer neon support plan contains four elements: 1. Gas reduction program to reduce neon by >50% while maintaining existing performance levels and availability; 2. short-term containment solutions for immediate relief. 3. qualification of additional gas suppliers; and 4. long-term recycling/reclaim opportunity. The Cymer neon reduction program has shown excellent results as demonstrated through the comparison on standard gas use versus the new >50% reduced neon performance for ArF immersion light sources. Testing included stressful conditions such as repetition rate, duty cycle and energy target changes. No performance degradation has been observed over typical gas lives.

  6. Implementing Laboratory Quality Management Systems in Mozambique: The Becton Dickinson-US President's Emergency Plan for AIDS Relief Public-Private Partnership Initiative.

    PubMed

    Skaggs, Beth; Pinto, Isabel; Masamha, Jessina; Turgeon, David; Gudo, Eduardo Samo

    2016-04-15

    Mozambique's ministry of health (MOH) recognized the need to establish a national laboratory quality assurance (NLQA) program to improve the reliability and accuracy of laboratory testing. The Becton Dickinson-US President's Emergency Plan for AIDS Relief Public-Private Partnership (PPP) was used to garner MOH commitment and train a cadre of local auditors and managers to support sustainability and country ownership of a NLQA program. From January 2011 to April 2012, the World Health Organization Regional Office for Africa Stepwise Laboratory Quality Improvement Process Towards Accreditation (SLIPTA) checklist and the Strengthening Laboratory Management Towards Accreditation (SLMTA) curriculum were used in 6 MOH laboratories. PPP volunteers provided training and mentorship to build the capacity of local auditors and program managers to promote institutionalization and sustainability of the program within the MOH. SLIPTA was launched in 6 MOH laboratories, and final audits demonstrated improvements across the 13 quality system essentials, compared with baseline. Training and mentorship of MOH staff by PPP volunteers resulted in 18 qualified auditors and 28 managers/quality officers capacitated to manage the improvement process in their laboratories. SLIPTA helps laboratories improve the quality and reliability of their service even in the absence of full accreditation. Local capacity building ensures sustainability by creating country buy-in, reducing costs of audits, and institutionalizing program management. Published by Oxford University Press for the Infectious Diseases Society of America 2016. This work is written by (a) US Government employee(s) and is in the public domain in the US.

  7. Toward Agent Programs with Circuit Semantics

    NASA Technical Reports Server (NTRS)

    Nilsson, Nils J.

    1992-01-01

    New ideas are presented for computing and organizing actions for autonomous agents in dynamic environments-environments in which the agent's current situation cannot always be accurately discerned and in which the effects of actions cannot always be reliably predicted. The notion of 'circuit semantics' for programs based on 'teleo-reactive trees' is introduced. Program execution builds a combinational circuit which receives sensory inputs and controls actions. These formalisms embody a high degree of inherent conditionality and thus yield programs that are suitably reactive to their environments. At the same time, the actions computed by the programs are guided by the overall goals of the agent. The paper also speculates about how programs using these ideas could be automatically generated by artificial intelligence planning systems and adapted by learning methods.

  8. A Growth Status Measurement Pilot in Four Calgary Area Schools: Perceptions of Grade 5 Students and Their Parents

    ERIC Educational Resources Information Center

    Johnston, J. Cyne T.; McNeil, Deborah A.; Best, Maureen; MacLeod, Cheryl

    2011-01-01

    Reliable measures of growth in children are necessary for planning and evaluating obesity prevention programs. Currently, measured growth data are unavailable in Calgary for school-age children. This single sample, cross-sectional study included Grade 5 students and their parents. Height and weight measurements of 305 students (68% of those…

  9. Lunar precursor missions for human exploration of Mars--III: studies of system reliability and maintenance.

    PubMed

    Mendell, W W; Heydorn, R P

    2004-01-01

    Discussions of future human expeditions into the solar system generally focus on whether the next explorers ought to go to the Moon or to Mars. The only mission scenario developed in any detail within NASA is an expedition to Mars with a 500-day stay at the surface. The technological capabilities and the operational experience base required for such a mission do not now exist nor has any self-consistent program plan been proposed to acquire them. In particular, the lack of an Abort-to-Earth capability implies that critical mission systems must perform reliably for 3 years or must be maintainable and repairable by the crew. As has been previously argued, a well-planned program of human exploration of the Moon would provide a context within which to develop the appropriate technologies because a lunar expedition incorporates many of the operational elements of a Mars expedition. Initial lunar expeditions can be carried out at scales consistent with the current experience base but can be expanded in any or all operational phases to produce an experience base necessary to successfully and safely conduct human exploration of Mars. Published by Elsevier Ltd.

  10. Lunar precursor missions for human exploration of Mars--III: studies of system reliability and maintenance

    NASA Technical Reports Server (NTRS)

    Mendell, W. W.; Heydorn, R. P.

    2004-01-01

    Discussions of future human expeditions into the solar system generally focus on whether the next explorers ought to go to the Moon or to Mars. The only mission scenario developed in any detail within NASA is an expedition to Mars with a 500-day stay at the surface. The technological capabilities and the operational experience base required for such a mission do not now exist nor has any self-consistent program plan been proposed to acquire them. In particular, the lack of an Abort-to-Earth capability implies that critical mission systems must perform reliably for 3 years or must be maintainable and repairable by the crew. As has been previously argued, a well-planned program of human exploration of the Moon would provide a context within which to develop the appropriate technologies because a lunar expedition incorporates many of the operational elements of a Mars expedition. Initial lunar expeditions can be carried out at scales consistent with the current experience base but can be expanded in any or all operational phases to produce an experience base necessary to successfully and safely conduct human exploration of Mars. Published by Elsevier Ltd.

  11. Breast volumetric analysis for aesthetic planning in breast reconstruction: a literature review of techniques

    PubMed Central

    Rozen, Warren Matthew; Spychal, Robert T.; Hunter-Smith, David J.

    2016-01-01

    Background Accurate volumetric analysis is an essential component of preoperative planning in both reconstructive and aesthetic breast procedures towards achieving symmetrization and patient-satisfactory outcome. Numerous comparative studies and reviews of individual techniques have been reported. However, a unifying review of all techniques comparing their accuracy, reliability, and practicality has been lacking. Methods A review of the published English literature dating from 1950 to 2015 using databases, such as PubMed, Medline, Web of Science, and EMBASE, was undertaken. Results Since Bouman’s first description of water displacement method, a range of volumetric assessment techniques have been described: thermoplastic casting, direct anthropomorphic measurement, two-dimensional (2D) imaging, and computed tomography (CT)/magnetic resonance imaging (MRI) scans. However, most have been unreliable, difficult to execute and demonstrate limited practicability. Introduction of 3D surface imaging has revolutionized the field due to its ease of use, fast speed, accuracy, and reliability. However, its widespread use has been limited by its high cost and lack of high level of evidence. Recent developments have unveiled the first web-based 3D surface imaging program, 4D imaging, and 3D printing. Conclusions Despite its importance, an accurate, reliable, and simple breast volumetric analysis tool has been elusive until the introduction of 3D surface imaging technology. However, its high cost has limited its wide usage. Novel adjunct technologies, such as web-based 3D surface imaging program, 4D imaging, and 3D printing, appear promising. PMID:27047788

  12. Feed-pump hydraulic performance and design improvement, Phase I: research program design. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, W.H.; Gopalakrishnan, S.; Fehlau, R.

    1982-03-01

    As a result of prior EPRI-sponsored studies, it was concluded that a research program should be designed and implemented to provide an improved basis for the design, procurement, testing, and operation of large feed pumps with increased reliability and stability over the full range of operating conditions. This two-volume report contains a research plan which is based on a review of the present state of the art and which defines the necessary R and D program and estimates the benefits and costs of the program. The recommended research program consists of 30 interrelated tasks. It is designed to perform themore » needed research; to verify the results; to develop improved components; and to publish computer-aided design methods, pump specification guidelines, and a troubleshooting manual. Most of the technology proposed in the research plan is applicable to nuclear power plants as well as to fossil-fired plants. This volume contains appendixes on pump design, cavitation damage, performance testing, hydraulics, two-phase flow in pumps, flow stability, and rotor dynamics.« less

  13. The Army/Air Force RAMCAD (Reliability and Maintainability Computer-Aided Design) Program Progress Report Through September 1989

    DTIC Science & Technology

    1990-01-01

    deal with platforms and their weapons. Two approaches emerged from this effort. The first plan was to address the benefits and the problems involved in...inadam~ or on a remnoftd lcod oompLusr. 3. The Nwaiguior tabthe DGMSIt aD wWe rq4he datatote ApicadwProW tip FaMW Tebs. *4. The didaI formailed for...demonstrated the benefits to be gained in time and training cost of a common method for operating different computer programs. It is this common mode of

  14. Stirling Powered Van Progam overview

    NASA Technical Reports Server (NTRS)

    Shaltens, R. K.

    1986-01-01

    The Stirling Powered Van Program (SPVP) is a multiyear, multiphase program to evaluate the automotive Stirling engine (ASE) in Air Force vans under realistic conditions. The objective of the SPVP is to transfer to manufacturer and end user(s) (i.e., on the path to commercialization) the second-generation Mod 2 ASE upon completion of the Automotive Stirling Engine Program in 1987. In order to meet this objective, the SPVP must establish Stirling performance, integrity, reliability, durability and maintainability. The ASE program background leading to the van program is reviewed and plans for evaluating the kinematic Stirling engine in Air Force vans examined. Also discussed are the NASA technology transfers to industry that have been accomplished and those which are currently being developed.

  15. Figures of Merit for Aeronautics Programs and Addition to NASA LARC Fire Station

    NASA Technical Reports Server (NTRS)

    Harper, Belinda M.

    1995-01-01

    This report accounts details of two research projects for the Langley Aerospace Research Summer Scholars (LARSS) program. The first project, with the Office of Mission Assurance, involved subjectively predicting the probable success of two aeronautics programs by means of a tool called a Figure of Merit. The figure of merit bases program success on the quality and reliability of the following factors: parts, complexity of research, quality programs, hazards elimination, and single point failures elimination. The second project, for the Office of Safety and Facilities Assurance, required planning, layouts, and source seeking for an addition to the fire house. Forecasted changes in facility layout necessitate this addition which will serve as housing for the fire fighters.

  16. Understanding the policy environment for immunization supply chains: Lessons learned from landscape analyses in Uganda and Senegal.

    PubMed

    Luzze, Henry; Badiane, Ousseynou; Mamadou Ndiaye, El Hadji; Ndiaye, Annette Seck; Atuhaire, Brian; Atuhebwe, Phionah; Guinot, Phillippe; Fry Sosne, Erin; Gueye, Abdoulaye

    2017-04-19

    As immunization programs around the world undergo rapid change and expansion, supply chain and logistics systems have become strained, making it increasingly challenging for national public health systems to provide reliable, safe, and efficient access to vaccines. Governments and immunization partners have been aware of this problem for several years, and in 2010, the World Health Organization (WHO) launched the Effective Vaccine Management (EVM) process to help countries identify shortcomings in their immunization supply chains and develop plans for systematic improvement. EVM improvement plans now exist in all Gavi-eligible countries plus many middle- and upper-income countries; however, implementation has been slow and in many cases fraught with financial, managerial, structural, and political roadblocks. Recognizing that significant change of any kind requires a supportive policy environment and strong leadership, PATH began working in Uganda and Senegal to landscape the policy environment around immunization and identify relevant policies, administrative and technical roles and responsibilities, and other issues that may be affecting the supply chain for immunization. The policy landscape assessments included a desk review and a series of structured, in-depth interviews with key international, national, and local stakeholders. The findings highlighted a number of critical issues and challenges in both countries that may be preventing supply chains from functioning optimally. These challenges include a need for better coordination and planning between immunization programs and supply chain managers; the need for sufficient, timely and reliable financing for all aspects of immunization programs; the need for high-level managers trained in immunization supply chain management; and an urgent need for better, more timely data for decision-making. Overcoming these challenges will require the involvement of high-level political actors-including ministers of health and finance, parliamentarians, and other officials who have the ability to approve and influence policy, personnel, and structural changes; ensure work plans are backed with adequate resources for implementation; and hold program managers accountable for achieving agreed indicators. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  17. DOD Business Systems Modernization: Planned Investment in Navy Program to Create Cashless Shipboard Environment Needs to Be Justified and Better Managed

    DTIC Science & Technology

    2008-09-01

    Abbreviations ATM automated teller machine BEA business enterprise architecture DOD...Limitations Automated Teller Machines (ATMs)-At-Sea 1988 Localized, shipboard ATMs that received and accounted for a portion of sailors’ and...use smart card technology for electronic retail ransactions and (2) economically justified on the basis of reliable analyses of stimated costs and

  18. Adapting industry-style business model to academia in a system of Performance-based Incentive Compensation.

    PubMed

    Reece, E Albert; Nugent, Olan; Wheeler, Richard P; Smith, Charles W; Hough, Aubrey J; Winter, Charles

    2008-01-01

    Performance-Based Incentive Compensation (PBIC) plans currently prevail throughout industry and have repeatedly demonstrated effectiveness as powerful motivational tools for attracting and retaining top talent, enhancing key indicators, increasing employee productivity, and, ultimately, enhancing mission-based parameters. The University of Arkansas for Medical Sciences (UAMS) College of Medicine introduced its PBIC plan to further the transition of the college to a high-performing academic and clinical enterprise. A forward-thinking compensation plan was progressively implemented during a three-year period. After the introduction of an aggressive five-year vision plan in 2002, the college introduced a PBIC plan designed to ensure the retention and recruitment of high-quality faculty through the use of uncapped salaries that reflect each faculty member's clinical, research, and education duties. The PBIC plan was introduced with broad, schoolwide principles adaptable to each department and purposely flexible to allow for tailor-made algorithms to fit the specific approaches required by individual departments. As of July 2006, the college had begun to reap a variety of short-term benefits from Phase I of its PBIC program, including increases in revenue and faculty salaries, and increased faculty morale and satisfaction.Successful implementation of a PBIC plan depends on a host of factors, including the development of a process for evaluating performance that is considered fair and reliable to the entire faculty. The college has become more efficient and effective by adopting such a program, which has helped it to increase overall productivity. The PBIC program continues to challenge our faculty members to attain their highest potential while rewarding them accordingly.

  19. Human Research Program Integrated Research Plan: December 20, 2007, Interim Baseline

    NASA Technical Reports Server (NTRS)

    2008-01-01

    The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies, and tools to enable safe, reliable, and productive human space exploration. This Integrated Research Plan (IRP) describes the program s research activities that are intended to address the needs of human space exploration and serve HRP customers. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration. The document serves several purposes for the Human Research Program: The IRP provides a means to assure that the most significant risks to human space explorers are being adequately mitigated and/or addressed, The IRP shows the relationship of research activities to expected outcomes and need dates, The IRP shows the interrelationships among research activities that may interact to produce products that are integrative or cross defined research disciplines, The IRP illustrates the non-deterministic nature of research and technology activities by showing expected decision points and potential follow-on activities, The IRP shows the assignments of responsibility within the program organization and, as practical, the intended solicitation approach, The IRP shows the intended use of research platforms such as the International Space Station, NASA Space Radiation Laboratory, and various space flight analogs. The IRP does not show all budgeted activities of the Human research program, as some of these are enabling functions, such as management, facilities and infrastructure

  20. NASA 2nd Generation RLV Program Introduction, Status and Future Plans

    NASA Technical Reports Server (NTRS)

    Dumbacher, Dan L.; Smith, Dennis E. (Technical Monitor)

    2002-01-01

    The Space Launch Initiative (SLI), managed by the Second Generation Reusable Launch Vehicle (2ndGen RLV) Program, was established to examine the possibility of revolutionizing space launch capabilities, define conceptual architectures, and concurrently identify the advanced technologies required to support a next-generation system. Initial Program funds have been allocated to design, evaluate, and formulate realistic plans leading to a 2nd Gen RLV full-scale development (FSD) decision by 2006. Program goals are to reduce both risk and cost for accessing the limitless opportunities afforded outside Earth's atmosphere fo civil, defense, and commercial enterprises. A 2nd Gen RLV architecture includes a reusable Earth-to-orbit launch vehicle, an on-orbit transport and return vehicle, ground and flight operations, mission planning, and both on-orbit and on-the-ground support infrastructures All segments of the architecture must advance in step with development of the RLV if a next-generation system is to be fully operational early next decade. However, experience shows that propulsion is the single largest contributor to unreliability during ascent, requires the largest expenditure of time for maintenance, and takes a long time to develop; therefore, propulsion is the key to meeting safety, reliability, and cost goals. For these reasons, propulsion is SLI's top technology investment area.

  1. Human Research Program Integrated Research Plan. Revision C

    NASA Technical Reports Server (NTRS)

    Steinberg, Susan

    2011-01-01

    Crew health and performance are critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes (1) HRP's approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and (2) the method of integration for risk mitigation. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.

  2. The Cost of Saving Electricity Through Energy Efficiency Programs Funded by Utility Customers: 2009–2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, Ian M.; Goldman, Charles A.; Murphy, Sean

    The average cost to utilities to save a kilowatt-hour (kWh) in the United States is 2.5 cents, according to the most comprehensive assessment to date of the cost performance of energy efficiency programs funded by electricity customers. These costs are similar to those documented earlier. Cost-effective efficiency programs help ensure electricity system reliability at the most affordable cost as part of utility planning and implementation activities for resource adequacy. Building on prior studies, Berkeley Lab analyzed the cost performance of 8,790 electricity efficiency programs between 2009 and 2015 for 116 investor-owned utilities and other program administrators in 41 states. Themore » Berkeley Lab database includes programs representing about three-quarters of total spending on electricity efficiency programs in the United States.« less

  3. Optimized production planning model for a multi-plant cultivation system under uncertainty

    NASA Astrophysics Data System (ADS)

    Ke, Shunkui; Guo, Doudou; Niu, Qingliang; Huang, Danfeng

    2015-02-01

    An inexact multi-constraint programming model under uncertainty was developed by incorporating a production plan algorithm into the crop production optimization framework under the multi-plant collaborative cultivation system. In the production plan, orders from the customers are assigned to a suitable plant under the constraints of plant capabilities and uncertainty parameters to maximize profit and achieve customer satisfaction. The developed model and solution method were applied to a case study of a multi-plant collaborative cultivation system to verify its applicability. As determined in the case analysis involving different orders from customers, the period of plant production planning and the interval between orders can significantly affect system benefits. Through the analysis of uncertain parameters, reliable and practical decisions can be generated using the suggested model of a multi-plant collaborative cultivation system.

  4. Microgrids and distributed generation systems: Control, operation, coordination and planning

    NASA Astrophysics Data System (ADS)

    Che, Liang

    Distributed Energy Resources (DERs) which include distributed generations (DGs), distributed energy storage systems, and adjustable loads are key components in microgrid operations. A microgrid is a small electric power system integrated with on-site DERs to serve all or some portion of the local load and connected to the utility grid through the point of common coupling (PCC). Microgrids can operate in both grid-connected mode and island mode. The structure and components of hierarchical control for a microgrid at Illinois Institute of Technology (IIT) are discussed and analyzed. Case studies would address the reliable and economic operation of IIT microgrid. The simulation results of IIT microgrid operation demonstrate that the hierarchical control and the coordination strategy of distributed energy resources (DERs) is an effective way of optimizing the economic operation and the reliability of microgrids. The benefits and challenges of DC microgrids are addressed with a DC model for the IIT microgrid. We presented the hierarchical control strategy including the primary, secondary, and tertiary controls for economic operation and the resilience of a DC microgrid. The simulation results verify that the proposed coordinated strategy is an effective way of ensuring the resilient response of DC microgrids to emergencies and optimizing their economic operation at steady state. The concept and prototype of a community microgrid that interconnecting multiple microgrids in a community are proposed. Two works are conducted. For the coordination, novel three-level hierarchical coordination strategy to coordinate the optimal power exchanges among neighboring microgrids is proposed. For the planning, a multi-microgrid interconnection planning framework using probabilistic minimal cut-set (MCS) based iterative methodology is proposed for enhancing the economic, resilience, and reliability signals in multi-microgrid operations. The implementation of high-reliability microgrids requires proper protection schemes that effectively function in both grid-connected and island modes. This chapter presents a communication-assisted four-level hierarchical protection strategy for high-reliability microgrids, and tests the proposed protection strategy based on a loop structured microgrid. The simulation results demonstrate the proposed strategy to be an effective and efficient option for microgrid protection. Additionally, microgrid topology ought to be optimally planned. To address the microgrid topology planning, a graph-partitioning and integer-programming integrated methodology is proposed. This work is not included in the dissertation. Interested readers can refer to our related publication.

  5. A plan for the North American Bat Monitoring Program (NABat)

    USGS Publications Warehouse

    Loeb, Susan C.; Rodhouse, Thomas J.; Ellison, Laura E.; Lausen, Cori L.; Reichard, Jonathan D.; Irvine, Kathryn M.; Ingersoll, Thomas E.; Coleman, Jeremy; Thogmartin, Wayne E.; Sauer, John R.; Francis, Charles M.; Bayless, Mylea L.; Stanley, Thomas R.; Johnson, Douglas H.

    2015-01-01

    The purpose of the North American Bat Monitoring Program (NABat) is to create a continent-wide program to monitor bats at local to rangewide scales that will provide reliable data to promote effective conservation decisionmaking and the long-term viability of bat populations across the continent. This is an international, multiagency program. Four approaches will be used to gather monitoring data to assess changes in bat distributions and abundances: winter hibernaculum counts, maternity colony counts, mobile acoustic surveys along road transects, and acoustic surveys at stationary points. These monitoring approaches are described along with methods for identifying species recorded by acoustic detectors. Other chapters describe the sampling design, the database management system (Bat Population Database), and statistical approaches that can be used to analyze data collected through this program.

  6. Inorganic Composite Materials in Japan: Status and Trends

    DTIC Science & Technology

    1989-11-01

    is planned with have already done some preliminary work) more sayby engineers and scientists and less on titanium and aluminide matrix compos- by...structural reliability of continued research in elevated tempera- the components. ture fiber and ceramic matrix composites. F=aMoving Blade (FRP...Forming Kawasaki 11eavy Ind with regard to these program target goals ONRFE M7 6 for carbon (CF), SiC, and boron filaments in isotropic titanium

  7. JPRS Report Science & Technology Japan

    DTIC Science & Technology

    1989-10-25

    Testing Slated for New BWR Fuel Assemblies [GENSHIRYOKU SANGYO SHIMBUN, 25 May 89] .... 37 Nuclear Fuel Planning System Developed [GENSHIRYOKU... Development (Debt) 13,272 ((Debt) 3,839) 7,995 (3,610) In addition, the budget has guaranteed that the following programs will proceed according... develop a combined cycle engine that will be capable of attaining high reliability and good fuel consumption at a wide range of speeds from low speed to

  8. Inspection planning development: An evolutionary approach using reliability engineering as a tool

    NASA Technical Reports Server (NTRS)

    Graf, David A.; Huang, Zhaofeng

    1994-01-01

    This paper proposes an evolutionary approach for inspection planning which introduces various reliability engineering tools into the process and assess system trade-offs among reliability, engineering requirement, manufacturing capability and inspection cost to establish an optimal inspection plan. The examples presented in the paper illustrate some advantages and benefits of the new approach. Through the analysis, reliability and engineering impacts due to manufacturing process capability and inspection uncertainty are clearly understood; the most cost effective and efficient inspection plan can be established and associated risks are well controlled; some inspection reductions and relaxations are well justified; and design feedbacks and changes may be initiated from the analysis conclusion to further enhance reliability and reduce cost. The approach is particularly promising as global competitions and customer quality improvement expectations are rapidly increasing.

  9. The SACADA database for human reliability and human performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Y. James Chang; Dennis Bley; Lawrence Criscione

    2014-05-01

    Lack of appropriate and sufficient human performance data has been identified as a key factor affecting human reliability analysis (HRA) quality especially in the estimation of human error probability (HEP). The Scenario Authoring, Characterization, and Debriefing Application (SACADA) database was developed by the U.S. Nuclear Regulatory Commission (NRC) to address this data need. An agreement between NRC and the South Texas Project Nuclear Operating Company (STPNOC) was established to support the SACADA development with aims to make the SACADA tool suitable for implementation in the nuclear power plants' operator training program to collect operator performance information. The collected data wouldmore » support the STPNOC's operator training program and be shared with the NRC for improving HRA quality. This paper discusses the SACADA data taxonomy, the theoretical foundation, the prospective data to be generated from the SACADA raw data to inform human reliability and human performance, and the considerations on the use of simulator data for HRA. Each SACADA data point consists of two information segments: context and performance results. Context is a characterization of the performance challenges to task success. The performance results are the results of performing the task. The data taxonomy uses a macrocognitive functions model for the framework. At a high level, information is classified according to the macrocognitive functions of detecting the plant abnormality, understanding the abnormality, deciding the response plan, executing the response plan, and team related aspects (i.e., communication, teamwork, and supervision). The data are expected to be useful for analyzing the relations between context, error modes and error causes in human performance.« less

  10. Test Planning Approach and Lessons

    NASA Technical Reports Server (NTRS)

    Parkinson, Douglas A.; Brown, Kendall K.

    2004-01-01

    As NASA began technology risk reduction activities and planning for the next generation launch vehicle under the Space Launch Initiative (SLI), now the Next Generation Launch Technology (NGLT) Program, a review of past large liquid rocket engine development programs was performed. The intent of the review was to identify any significant lessons from the development testing programs that could be applied to current and future engine development programs. Because the primary prototype engine in design at the time of this study was the Boeing-Rocketdyne RS-84, the study was slightly biased towards LOX/RP-1 liquid propellant engines. However, the significant lessons identified are universal. It is anticipated that these lessons will serve as a reference for test planning in the Engine Systems Group at Marshall Space Flight Center (MSFC). Towards the end of F-1 and J-2 engine development testing, NASA/MSFC asked Rocketdyne to review those test programs. The result was a document titled, Study to Accelerate Development by Test of a Rocket Engine (R-8099). The "intent (of this study) is to apply this thinking and learning to more efficiently develop rocket engines to high reliability with improved cost effectivenes" Additionally, several other engine programs were reviewed - such as SSME, NSTS, STME, MC-1, and RS-83- to support or refute the R-8099. R-8099 revealed two primary lessons for test planning, which were supported by the other engine development programs. First, engine development programs can benefit from arranging the test program for engine system testing as early as feasible. The best test for determining environments is at the system level, the closest to the operational flight environment. Secondly, the component testing, which tends to be elaborate, should instead be geared towards reducing risk to enable system test. Technical risk can be reduced at the component level, but the design can only be truly verified and validated after engine system testing.

  11. Analysis of linear measurements on 3D surface models using CBCT data segmentation obtained by automatic standard pre-set thresholds in two segmentation software programs: an in vitro study.

    PubMed

    Poleti, Marcelo Lupion; Fernandes, Thais Maria Freire; Pagin, Otávio; Moretti, Marcela Rodrigues; Rubira-Bullen, Izabel Regina Fischer

    2016-01-01

    The aim of this in vitro study was to evaluate the reliability and accuracy of linear measurements on three-dimensional (3D) surface models obtained by standard pre-set thresholds in two segmentation software programs. Ten mandibles with 17 silica markers were scanned for 0.3-mm voxels in the i-CAT Classic (Imaging Sciences International, Hatfield, PA, USA). Twenty linear measurements were carried out by two observers two times on the 3D surface models: the Dolphin Imaging 11.5 (Dolphin Imaging & Management Solutions, Chatsworth, CA, USA), using two filters(Translucent and Solid-1), and in the InVesalius 3.0.0 (Centre for Information Technology Renato Archer, Campinas, SP, Brazil). The physical measurements were made by another observer two times using a digital caliper on the dry mandibles. Excellent intra- and inter-observer reliability for the markers, physical measurements, and 3D surface models were found (intra-class correlation coefficient (ICC) and Pearson's r ≥ 0.91). The linear measurements on 3D surface models by Dolphin and InVesalius software programs were accurate (Dolphin Solid-1 > InVesalius > Dolphin Translucent). The highest absolute and percentage errors were obtained for the variable R1-R1 (1.37 mm) and MF-AC (2.53 %) in the Dolphin Translucent and InVesalius software, respectively. Linear measurements on 3D surface models obtained by standard pre-set thresholds in the Dolphin and InVesalius software programs are reliable and accurate compared with physical measurements. Studies that evaluate the reliability and accuracy of the 3D models are necessary to ensure error predictability and to establish diagnosis, treatment plan, and prognosis in a more realistic way.

  12. A Successful Infusion Process for Enabling Lunar Exploration Technologies

    NASA Technical Reports Server (NTRS)

    Over, Ann P.; Klem, Mark K.; Motil, Susan M.

    2008-01-01

    The NASA Vision for Space Exploration begins with a more reliable flight capability to the International Space Station and ends with sending humans to Mars. An important stepping stone on the path to Mars encompasses human missions to the Moon. There is little doubt throughout the stakeholder community that new technologies will be required to enable this Vision. However, there are many factors that influence the ability to successfully infuse any technology including the technical risk, requirement and development schedule maturity, and, funds available. This paper focuses on effective infusion processes that have been used recently for the technologies in development for the lunar exploration flight program, Constellation. Recent successes with Constellation customers are highlighted for the Exploration Technology Development Program (ETDP) Projects managed by NASA Glenn Research Center (GRC). Following an overview of the technical context of both the flight program and the technology capability mapping, the process is described for how to effectively build an integrated technology infusion plan. The process starts with a sound risk development plan and is completed with an integrated project plan, including content, schedule and cost. In reality, the available resources for this development are going to change over time, necessitating some level of iteration in the planning. However, the driving process is based on the initial risk assessment, which changes only when the overall architecture changes, enabling some level of stability in the process.

  13. Mod-5A wind turbine generator program design report. Volume 3: Final design and system description, book 2

    NASA Technical Reports Server (NTRS)

    1984-01-01

    The design, development and analysis of the 7.3MW MOD-5A wind turbine generator is documented. The report is divided into four volumes: Volume 1 summarizes the entire MOD-5A program, Volume 2 discusses the conceptual and preliminary design phases, Volume 3 describes the final design of the MOD-5A, and Volume 4 contains the drawings and specifications developed for the final design. Volume 3, book 2 describes the performance and characteristics of the MOD-5A wind turbine generator in its final configuration. The subsystem for power generation, control, and instrumentation subsystems is described in detail. The manufacturing and construction plans, and the preparation of a potential site on Oahu, Hawaii, are documented. The quality assurance and safety plan, and analyses of failure modes and effects, and reliability, availability and maintainability are presented.

  14. Choosing a reliability inspection plan for interval censored data

    DOE PAGES

    Lu, Lu; Anderson-Cook, Christine Michaela

    2017-04-19

    Reliability test plans are important for producing precise and accurate assessment of reliability characteristics. This paper explores different strategies for choosing between possible inspection plans for interval censored data given a fixed testing timeframe and budget. A new general cost structure is proposed for guiding precise quantification of total cost in inspection test plan. Multiple summaries of reliability are considered and compared as the criteria for choosing the best plans using an easily adapted method. Different cost structures and representative true underlying reliability curves demonstrate how to assess different strategies given the logistical constraints and nature of the problem. Resultsmore » show several general patterns exist across a wide variety of scenarios. Given the fixed total cost, plans that inspect more units with less frequency based on equally spaced time points are favored due to the ease of implementation and consistent good performance across a large number of case study scenarios. Plans with inspection times chosen based on equally spaced probabilities offer improved reliability estimates for the shape of the distribution, mean lifetime, and failure time for a small fraction of population only for applications with high infant mortality rates. The paper uses a Monte Carlo simulation based approach in addition to the common evaluation based on the asymptotic variance and offers comparison and recommendation for different applications with different objectives. Additionally, the paper outlines a variety of different reliability metrics to use as criteria for optimization, presents a general method for evaluating different alternatives, as well as provides case study results for different common scenarios.« less

  15. Choosing a reliability inspection plan for interval censored data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lu, Lu; Anderson-Cook, Christine Michaela

    Reliability test plans are important for producing precise and accurate assessment of reliability characteristics. This paper explores different strategies for choosing between possible inspection plans for interval censored data given a fixed testing timeframe and budget. A new general cost structure is proposed for guiding precise quantification of total cost in inspection test plan. Multiple summaries of reliability are considered and compared as the criteria for choosing the best plans using an easily adapted method. Different cost structures and representative true underlying reliability curves demonstrate how to assess different strategies given the logistical constraints and nature of the problem. Resultsmore » show several general patterns exist across a wide variety of scenarios. Given the fixed total cost, plans that inspect more units with less frequency based on equally spaced time points are favored due to the ease of implementation and consistent good performance across a large number of case study scenarios. Plans with inspection times chosen based on equally spaced probabilities offer improved reliability estimates for the shape of the distribution, mean lifetime, and failure time for a small fraction of population only for applications with high infant mortality rates. The paper uses a Monte Carlo simulation based approach in addition to the common evaluation based on the asymptotic variance and offers comparison and recommendation for different applications with different objectives. Additionally, the paper outlines a variety of different reliability metrics to use as criteria for optimization, presents a general method for evaluating different alternatives, as well as provides case study results for different common scenarios.« less

  16. The Electric Vehicle Alternative.

    DTIC Science & Technology

    1981-06-01

    7 qc, LIST OF TABLES Table Page 2-1 AIR TRAINING COMMAND EV DEMONSTRATION PROGRAM 30 3-1 COMPUTATION FOR DERIVATION OF THE COMBINED RELIABILITY...batteries wear out quickly be- cause the zinc they use gets dissapated in their charging/discharging cycle. GM plans to have such problems solved by 1985...with how the G & W battery controls the release of poi- sonous chlorine gas in the case of an accident.. Unlike the lead-acid battery, the zinc

  17. Avionics Integrity Program (AVIP). Volume 1. Procurement Phase Issues - Design, Manufacturing, and Integration

    DTIC Science & Technology

    1984-03-01

    Engineering initiative to develop an orderly plan and procedure to assure that USAF acquire reliable, high quality, supportable avionics with a higher avail...susceptibility te~t~ (radiated and conducted), and emission of radio frequency energy tests."l6) Other electrical stresses can include over/under voltage...jo ints, poor welds, and dielectric defects. Also, instruments with components unable to endu very high temperatures can be safely tested. 1-19

  18. Software Technology for Adaptable, Reliable Systems (STARS) Technical Program Plan,

    DTIC Science & Technology

    1986-08-06

    Shadow projects that are being considered by the SEI: Service Project Company . . Army FATDS Magnavox CSS To Be Determined PLRS Hughes Navy BSY-I IBM...ISCS Rockwell ACDS Hughes Air Force Simulators Boeing CSSR GTE ATF Grumman MILSTAR Lockheed Figure 4-2 Candidate FY 1986 Shadow Projects 4.2.3 SHADOW...Journal of the Armed Forces Communications and Electronic Association, September 1985. 11. Schill, J., Smeaton, R., and Jackman , R., The Conversion of

  19. IDA/OSD R&M (Institute for Defense Analyses/Office of the Secretary of Defense Reliability and Maintainability) Study Bibliography.

    DTIC Science & Technology

    1983-08-01

    30 -IOLW. c • o:,,tas z ".9’ IM moOm X-272 IDA... 30 -2 • . ,, ... .L.. . .i W . . .’ I".• : V.*.’’. ;, .. . ... ," ... ,. . - 4..; ,,, .,, R&M STUDY,. DOCUMENTS LIST ( by Subject )-.:,’.i AS OF: 22...DE60. Maintainability Standardization Document Program Plan, Revision 1, Draft, DoD, 30 April 1982. DE82. Acquisition and Management of

  20. Titan II. Reliability and Aging Surveillance Program (RASP) Management Plan

    DTIC Science & Technology

    1974-12-02

    following organizations: SAC OGDEN ALC * LGBT *MMER XPQM *MMCO BM MMCP V DEFS MMCR DOKM MMCT DOTM MMEW ~- V -~ -DOXX S • ,. _ X PQ T * Indicates...age and service on the Titan II Weapon System. This responsibility includes publication and dissemina- tion of reports and information. CINCSAC/ LGBT ...semiannually by the scheduling subcommittee composed of CINCSAC/ LGBT and Ogden ALC/ MMCO and MMER. LGBT will have primary responsibility for scheduling

  1. Strategies for Augmentation Initiatives for Leadership Self-Development Program

    DTIC Science & Technology

    1994-08-01

    sensitive to ethical matters. Leaders must not tolerate unethical behavior by subordinates, peers, or superic s. This can be an area of great ambiguity, if... planned with the intent of the reader becoming reliably informed and conversant with the topic, while maintaining a high level of motivation and interest...Soc;it Sciences Distribution Is restricted. U.S. ARMY RESEARCH INSTITUTE FOR THE BEHAVIORAL AND SOCIAL SCIENCES A Field Operating Agency Under the

  2. Implementation of new clinical programs in the VHA healthcare system: the importance of early collaboration between clinical leadership and research.

    PubMed

    Wu, R Ryanne; Kinsinger, Linda S; Provenzale, Dawn; King, Heather A; Akerly, Patricia; Barnes, Lottie K; Datta, Santanu K; Grubber, Janet M; Katich, Nicholas; McNeil, Rebecca B; Monte, Robert; Sperber, Nina R; Atkins, David; Jackson, George L

    2014-12-01

    Collaboration between policy, research, and clinical partners is crucial to achieving proven quality care. The Veterans Health Administration has expended great efforts towards fostering such collaborations. Through this, we have learned that an ideal collaboration involves partnership from the very beginning of a new clinical program, so that the program is designed in a way that ensures quality, validity, and puts into place the infrastructure necessary for a reliable evaluation. This paper will give an example of one such project, the Lung Cancer Screening Demonstration Project (LCSDP). We will outline the ways that clinical, policy, and research partners collaborated in design, planning, and implementation in order to create a sustainable model that could be rigorously evaluated for efficacy and fidelity. We will describe the use of the Donabedian quality matrix to determine the necessary characteristics of a quality program and the importance of the linkage with engineering, information technology, and clinical paradigms to connect the development of an on-the-ground clinical program with the evaluation goal of a learning healthcare organization. While the LCSDP is the example given here, these partnerships and suggestions are salient to any healthcare organization seeking to implement new scientifically proven care in a useful and reliable way.

  3. 77 FR 69615 - Commission Information Collection Activities (FERC-715); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-20

    ... transmission planning; A detailed description of the transmission planning reliability criteria used to..., but not limited to, how reliability criteria are applied and the steps taken in [[Page 69616... performance as measured against its stated reliability criteria using its stated assessment practices. The...

  4. Optimal sample sizes for the design of reliability studies: power consideration.

    PubMed

    Shieh, Gwowen

    2014-09-01

    Intraclass correlation coefficients are used extensively to measure the reliability or degree of resemblance among group members in multilevel research. This study concerns the problem of the necessary sample size to ensure adequate statistical power for hypothesis tests concerning the intraclass correlation coefficient in the one-way random-effects model. In view of the incomplete and problematic numerical results in the literature, the approximate sample size formula constructed from Fisher's transformation is reevaluated and compared with an exact approach across a wide range of model configurations. These comprehensive examinations showed that the Fisher transformation method is appropriate only under limited circumstances, and therefore it is not recommended as a general method in practice. For advance design planning of reliability studies, the exact sample size procedures are fully described and illustrated for various allocation and cost schemes. Corresponding computer programs are also developed to implement the suggested algorithms.

  5. Life Cycle Systems Engineering Approach to NASA's 2nd Generation Reusable Launch Vehicle

    NASA Technical Reports Server (NTRS)

    Thomas, Dale; Smith, Charles; Safie, Fayssal; Kittredge, Sheryl

    2002-01-01

    The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd- generation system by 2 orders of magnitude - equivalent to a crew risk of 1 -in- 10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. Given a candidate architecture that possesses credible physical processes and realistic technology assumptions, the next set of analyses address the system's functionality across the spread of operational scenarios characterized by the design reference missions. The safety/reliability and cost/economics associated with operating the system will also be modeled and analyzed to answer the questions "How safe is it?" and "How much will it cost to acquire and operate?" The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.

  6. The influence of various test plans on mission reliability. [for Shuttle Spacelab payloads

    NASA Technical Reports Server (NTRS)

    Stahle, C. V.; Gongloff, H. R.; Young, J. P.; Keegan, W. B.

    1977-01-01

    Methods have been developed for the evaluation of cost effective vibroacoustic test plans for Shuttle Spacelab payloads. The shock and vibration environments of components have been statistically represented, and statistical decision theory has been used to evaluate the cost effectiveness of five basic test plans with structural test options for two of the plans. Component, subassembly, and payload testing have been performed for each plan along with calculations of optimum test levels and expected costs. The tests have been ranked according to both minimizing expected project costs and vibroacoustic reliability. It was found that optimum costs may vary up to $6 million with the lowest plan eliminating component testing and maintaining flight vibration reliability via subassembly tests at high acoustic levels.

  7. Reliability models: the influence of model specification in generation expansion planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stremel, J.P.

    1982-10-01

    This paper is a critical evaluation of reliability methods used for generation expansion planning. It is shown that the methods for treating uncertainty are critical for determining the relative reliability value of expansion alternatives. It is also shown that the specification of the reliability model will not favor all expansion options equally. Consequently, the model is biased. In addition, reliability models should be augmented with an economic value of reliability (such as the cost of emergency procedures or energy not served). Generation expansion evaluations which ignore the economic value of excess reliability can be shown to be inconsistent. The conclusionsmore » are that, in general, a reliability model simplifies generation expansion planning evaluations. However, for a thorough analysis, the expansion options should be reviewed for candidates which may be unduly rejected because of the bias of the reliability model. And this implies that for a consistent formulation in an optimization framework, the reliability model should be replaced with a full economic optimization which includes the costs of emergency procedures and interruptions in the objective function.« less

  8. 77 FR 53877 - Commission Information Collection Activities (FERC-715); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ...; A detailed description of the transmission planning reliability criteria used to evaluate system... reliability criteria are applied and the steps taken in performing transmission planning studies); and A... reliability criteria using its stated assessment practices. The FERC-715 enables the Commission to use the...

  9. Reliability-Based Life Assessment of Stirling Convertor Heater Head

    NASA Technical Reports Server (NTRS)

    Shah, Ashwin R.; Halford, Gary R.; Korovaichuk, Igor

    2004-01-01

    Onboard radioisotope power systems being developed and planned for NASA's deep-space missions require reliable design lifetimes of up to 14 yr. The structurally critical heater head of the high-efficiency Stirling power convertor has undergone extensive computational analysis of operating temperatures, stresses, and creep resistance of the thin-walled Inconel 718 bill of material. A preliminary assessment of the effect of uncertainties in the material behavior was also performed. Creep failure resistance of the thin-walled heater head could show variation due to small deviations in the manufactured thickness and in uncertainties in operating temperature and pressure. Durability prediction and reliability of the heater head are affected by these deviations from nominal design conditions. Therefore, it is important to include the effects of these uncertainties in predicting the probability of survival of the heater head under mission loads. Furthermore, it may be possible for the heater head to experience rare incidences of small temperature excursions of short duration. These rare incidences would affect the creep strain rate and, therefore, the life. This paper addresses the effects of such rare incidences on the reliability. In addition, the sensitivities of variables affecting the reliability are quantified, and guidelines developed to improve the reliability are outlined. Heater head reliability is being quantified with data from NASA Glenn Research Center's accelerated benchmark testing program.

  10. The Acceptance Strategy for Nuclear Power Plant In Indonesia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Suhaemi, Tjipta; Syaukat, Achmad

    2010-06-22

    Indonesia has planned to build nuclear power plants. Some feasibility studies have been conducted intensively. However, the processes of NPP introduction are still uncertain. National Energy Plan in Indonesia, which has been made by some governmental agencies, does not yet give positive impact to the government decision to construct the nuclear power plant (NPP). This paper discusses the process of NPP introduction in Indonesia, which has been colored with debate of stakeholder and has delayed decision for go-nuclear. The technology paradigm is used to promote NPP as an alternative of reliable energy resources. This paradigm should be complemented with internationalmore » politic-economic point of view. The international politic-economic point of view shows that structural powers, consisting of security, production, finance, and knowledge structures, within which the NPP is introduced, have dynamic characteristics. The process of NPP introduction in Indonesia contains some infrastructure development (R and D, legislation, regulation, energy planning, site study, public acceptance efforts, etc), but they need a better coherent NPP implementation program and NPP Acceptance Program. Strategic patterns for NPP acceptance described in this paper are made by considering nuclear regulation development and the interest of basic domestic participation. The first NPP program in Indonesia having proven technology and basic domestic participation is and important milestone toward and optimal national energy-mix.« less

  11. Computer science: Key to a space program renaissance. The 1981 NASA/ASEE summer study on the use of computer science and technology in NASA. Volume 2: Appendices

    NASA Technical Reports Server (NTRS)

    Freitas, R. A., Jr. (Editor); Carlson, P. A. (Editor)

    1983-01-01

    Adoption of an aggressive computer science research and technology program within NASA will: (1) enable new mission capabilities such as autonomous spacecraft, reliability and self-repair, and low-bandwidth intelligent Earth sensing; (2) lower manpower requirements, especially in the areas of Space Shuttle operations, by making fuller use of control center automation, technical support, and internal utilization of state-of-the-art computer techniques; (3) reduce project costs via improved software verification, software engineering, enhanced scientist/engineer productivity, and increased managerial effectiveness; and (4) significantly improve internal operations within NASA with electronic mail, managerial computer aids, an automated bureaucracy and uniform program operating plans.

  12. Advanced Launch System propulsion focused technology liquid methane turbopump technical implementation plan

    NASA Technical Reports Server (NTRS)

    Csomor, A.; Nielson, C. E.

    1989-01-01

    This program will focus on the integration of all functional disciplines of the design, manufacturing, materials, fabrication and producibility to define and demonstrate a highly reliable, easily maintained, low cost liquid methane turbopump as a component for the STBE (Space Transportation Booster Engine) using the STME (main engine) oxygen turbopump. A cost model is to be developed to predict the recurring cost of production hardware and operations. A prime objective of the program is to design the liquid methane turbopump to be used in common with a LH2 turbopump optimized for the STME. Time phasing of the effort is presented and interrelationship of the tasks is defined. Major subcontractors are identified and their roles in the program are described.

  13. Systems Engineering Approach to Technology Integration for NASA's 2nd Generation Reusable Launch Vehicle

    NASA Technical Reports Server (NTRS)

    Thomas, Dale; Smith, Charles; Thomas, Leann; Kittredge, Sheryl

    2002-01-01

    The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd-generation system by 2 orders of magnitude - equivalent to a crew risk of 1-in-10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. To best direct technology development decisions, analytical models are employed to accurately predict the benefits of each technology toward potential space transportation architectures as well as the risks associated with each technology. Rigorous systems analysis provides the foundation for assessing progress toward safety and cost goals. The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.

  14. Systems Engineering Approach to Technology Integration for NASA's 2nd Generation Reusable Launch Vehicle

    NASA Technical Reports Server (NTRS)

    Thomas, Dale; Smith, Charles; Thomas, Leann; Kittredge, Sheryl

    2002-01-01

    The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd generation system by 2 orders of magnitude - equivalent to a crew risk of 1-in-10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. To best direct technology development decisions, analytical models are employed to accurately predict the benefits of each technology toward potential space transportation architectures as well as the risks associated with each technology. Rigorous systems analysis provides the foundation for assessing progress toward safety and cost goals. The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.

  15. A Comprehensive Systems Testing Plan for the Smart Phone Assisted Rapid Communication and Control System (SPARCCS)

    DTIC Science & Technology

    2012-09-01

    project. Thanks to Arijit Das for advice and assistance over the course of my program. Thanks to Brian Steckler and Carl Prince for their assistance in...reliable. Wireless architectural and interoperability problems can include (Bell, Jung , & Krishnakumar, 2010; Nguyen, Waeselnck, & Riviere, 2008...usually when a new mission was created and then a user tried to join the mission shortly after. This appears to be a synchronization issue between the

  16. A dynamic family planning and health campaign.

    PubMed

    1986-11-01

    Any successful development program that combines family planning, nutrition, and parasite control such as the integrated project, must include effective information, education, and communication (IEC) components. The Population an Community Development Association (PDA), the largest nonprofit organization in Thailand provides a network of family planning service delivery composed of volunteer distributors including midwives, school techers and shopkeepers. Reliability and accessibility are the 2 important elements. A concerted media campaign which exposes people to condoms and other contraceptives helps desensitize an otherwise "too personal" issue. The problem which confronts family planning communication is how to counteract the sensuous messages form advetisers while focusing on mundane topics such as maternal and child health, responsible parenthood, and family budgets. The PDA has tried to use the same attractions to promote family planning. It distributes promotional items such as T-shirts, pens towels and cigarette lighters bearing family planning messages. In addition to the use of television and radio, PDA also utilizes every possible channel of communication. Approaches include: the Youth-to-Youth Program; informational exhibits; video-mobile vans which visit schools and factories; and the holding of PDA's vasectomy festivals. Informational exhibits on family planning and health care use a variety of audio-visual methods. Video is an effective communication medium. The PDA video material ordinarily consists of family dramas illustrating good and bad family planning practices. By holding vasectomy festivals, PDA provides a media-attracting forum to educate the public and promote vasectomey as the most effective birth control method. Mass media campaigns must be linked with fieldwork outreach.

  17. Fly-by-light flight control system technology development plan

    NASA Technical Reports Server (NTRS)

    Chakravarty, A.; Berwick, J. W.; Griffith, D. M.; Marston, S. E.; Norton, R. L.

    1990-01-01

    The results of a four-month, phased effort to develop a Fly-by-Light Technology Development Plan are documented. The technical shortfalls for each phase were identified and a development plan to bridge the technical gap was developed. The production configuration was defined for a 757-type airplane, but it is suggested that the demonstration flight be conducted on the NASA Transport Systems Research Vehicle. The modifications required and verification and validation issues are delineated in this report. A detailed schedule for the phased introduction of fly-by-light system components has been generated. It is concluded that a fiber-optics program would contribute significantly toward developing the required state of readiness that will make a fly-by-light control system not only cost effective but reliable without mitigating the weight and high-energy radio frequency related benefits.

  18. ASC FY17 Implementation Plan, Rev. 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hamilton, P. G.

    The Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, surety, and reliability of the U.S. nuclear stockpile. The SSP uses nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of experimental facilities and programs, and the computational capabilities to support these programs. The Advanced Simulation and Computing Program (ASC) is a cornerstone of the SSP, providing simulation capabilities and computationalmore » resources that support annual stockpile assessment and certification, study advanced nuclear weapons design and manufacturing processes, analyze accident scenarios and weapons aging, and provide the tools to enable stockpile Life Extension Programs (LEPs) and the resolution of Significant Finding Investigations (SFIs). This requires a balance of resources, including technical staff, hardware, simulation software, and computer science solutions.« less

  19. Dynamic analysis for solid waste management systems: an inexact multistage integer programming approach.

    PubMed

    Li, Yongping; Huang, Guohe

    2009-03-01

    In this study, a dynamic analysis approach based on an inexact multistage integer programming (IMIP) model is developed for supporting municipal solid waste (MSW) management under uncertainty. Techniques of interval-parameter programming and multistage stochastic programming are incorporated within an integer-programming framework. The developed IMIP can deal with uncertainties expressed as probability distributions and interval numbers, and can reflect the dynamics in terms of decisions for waste-flow allocation and facility-capacity expansion over a multistage context. Moreover, the IMIP can be used for analyzing various policy scenarios that are associated with different levels of economic consequences. The developed method is applied to a case study of long-term waste-management planning. The results indicate that reasonable solutions have been generated for binary and continuous variables. They can help generate desired decisions of system-capacity expansion and waste-flow allocation with a minimized system cost and maximized system reliability.

  20. Design for Reliability and Safety Approach for the NASA New Launch Vehicle

    NASA Technical Reports Server (NTRS)

    Safie, Fayssal, M.; Weldon, Danny M.

    2007-01-01

    The United States National Aeronautics and Space Administration (NASA) is in the midst of a space exploration program intended for sending crew and cargo to the international Space Station (ISS), to the moon, and beyond. This program is called Constellation. As part of the Constellation program, NASA is developing new launch vehicles aimed at significantly increase safety and reliability, reduce the cost of accessing space, and provide a growth path for manned space exploration. Achieving these goals requires a rigorous process that addresses reliability, safety, and cost upfront and throughout all the phases of the life cycle of the program. This paper discusses the "Design for Reliability and Safety" approach for the NASA new crew launch vehicle called ARES I. The ARES I is being developed by NASA Marshall Space Flight Center (MSFC) in support of the Constellation program. The ARES I consists of three major Elements: A solid First Stage (FS), an Upper Stage (US), and liquid Upper Stage Engine (USE). Stacked on top of the ARES I is the Crew exploration vehicle (CEV). The CEV consists of a Launch Abort System (LAS), Crew Module (CM), Service Module (SM), and a Spacecraft Adapter (SA). The CEV development is being led by NASA Johnson Space Center (JSC). Designing for high reliability and safety require a good integrated working environment and a sound technical design approach. The "Design for Reliability and Safety" approach addressed in this paper discusses both the environment and the technical process put in place to support the ARES I design. To address the integrated working environment, the ARES I project office has established a risk based design group called "Operability Design and Analysis" (OD&A) group. This group is an integrated group intended to bring together the engineering, design, and safety organizations together to optimize the system design for safety, reliability, and cost. On the technical side, the ARES I project has, through the OD&A environment, implemented a probabilistic approach to analyze and evaluate design uncertainties and understand their impact on safety, reliability, and cost. This paper focuses on the use of the various probabilistic approaches that have been pursued by the ARES I project. Specifically, the paper discusses an integrated functional probabilistic analysis approach that addresses upffont some key areas to support the ARES I Design Analysis Cycle (DAC) pre Preliminary Design (PD) Phase. This functional approach is a probabilistic physics based approach that combines failure probabilities with system dynamics and engineering failure impact models to identify key system risk drivers and potential system design requirements. The paper also discusses other probabilistic risk assessment approaches planned by the ARES I project to support the PD phase and beyond.

  1. Quality assurance program requirements, Amendment 5 (9-26-79) to August 1973 issue

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This standard sets forth general requirements for planning, managing, conducting, and evaluating quality assurance programs for reactor development and test facility projects and associated processes, structures, components, and systems. These quality assurance requirements are based on proven practices and provide the means of control and verification whereby those responsible fo poject management can assure that the quality required for safe, reliable, and economical operation will be achieved. The objective of the program of the programs covered by this standard is to assure that structures, components, systems, and facilities are designed, developed, manufactured, constructed, operated, and maintained in compliance with establishedmore » engineering criteria. To achieve this objective, controls are to be established and implemented at predetermined points, and necessary action taken to prevent, detect, and correct any deficiencies.« less

  2. Commercial Crew Development Program Overview

    NASA Technical Reports Server (NTRS)

    Russell, Richard W.

    2011-01-01

    NASA's Commercial Crew Development Program is designed to stimulate efforts within the private sector that will aid in the development and demonstration of safe, reliable, and cost-effective space transportation capabilities. With the goal of delivery cargo and eventually crew to Low Earth Orbit (LEO) and the International Space Station (ISS) the program is designed to foster the development of new spacecraft and launch vehicles in the commercial sector. Through Space Act Agreements (SAAs) in 2011 NASA provided $50M of funding to four partners; Blue Origin, The Boeing Company, Sierra Nevada Corporation, and SpaceX. Additional, NASA has signed two unfunded SAAs with ATK and United Space Alliance. This paper will give a brief summary of these SAAs. Additionally, a brief overview will be provided of the released version of the Commercial Crew Development Program plans and requirements documents.

  3. Time-Varying Value of Energy Efficiency in Michigan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mims, Natalie; Eckman, Tom; Schwartz, Lisa C.

    Quantifying the time-varying value of energy efficiency is necessary to properly account for all of its benefits and costs and to identify and implement efficiency resources that contribute to a low-cost, reliable electric system. Historically, most quantification of the benefits of efficiency has focused largely on the economic value of annual energy reduction. Due to the lack of statistically representative metered end-use load shape data in Michigan (i.e., the hourly or seasonal timing of electricity savings), the ability to confidently characterize the time-varying value of energy efficiency savings in the state, especially for weather-sensitive measures such as central air conditioning,more » is limited. Still, electric utilities in Michigan can take advantage of opportunities to incorporate the time-varying value of efficiency into their planning. For example, end-use load research and hourly valuation of efficiency savings can be used for a variety of electricity planning functions, including load forecasting, demand-side management and evaluation, capacity planning, long-term resource planning, renewable energy integration, assessing potential grid modernization investments, establishing rates and pricing, and customer service (KEMA 2012). In addition, accurately calculating the time-varying value of efficiency may help energy efficiency program administrators prioritize existing offerings, set incentive or rebate levels that reflect the full value of efficiency, and design new programs.« less

  4. Program evaluation in integrated resource planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Council, C.D.

    1994-12-31

    The Western Area Power Administration along with the Southwestern and Southeastern Power Administrations joined together to develop a set of integrated resource planning (IRP) tools to help their customers development and implement an IRP process. The project has been entitled the Resource Planning Guide (RPG), and is specifically designed to help small- to mid-sized utilities analyze supply- and demand-side alternatives as part of an IRP process. The RPG project will be available in January 1994 and will include such support as: workshops, technical assistance, an RPG hotline, and an RPG User`s Group for the project. The RPG grew out ofmore » the interest shown by utility customers who wanted a user-friendly tool to aid in their application of the IRP process. The project has been field tested by 43 utilities and related organizations over the last year, has sparked interest both nationally and internationally, and is now available for public use. The program evaluation aspects of the IRP process are heightened by a requirement of the Energy Policy Act of 1992 which requires all long-term power customers of the Western Area Power Administration to develop, implement, and monitor an IRP process. The EPAct defines IRP as: A planning process for new energy resources that evaluates the full range of alternatives, including new generating capacity, power purchases, energy conservation and efficiency, cogeneration and district heating and cooling applications, and renewable energy resources, to provide adequate and reliable service to its electric customers at the lowest system cost. The process takes into account necessary features for system operation, such as diversity, reliability, dispatchability, and other factors of risk; the ability to verify energy savings achieved through energy conservation and efficiency and the projected durability of such savings measured over time; and treats demand and supply resources on a consistent and integrated basis.« less

  5. Mass and Reliability Source (MaRS) Database

    NASA Technical Reports Server (NTRS)

    Valdenegro, Wladimir

    2017-01-01

    The Mass and Reliability Source (MaRS) Database consolidates components mass and reliability data for all Oribital Replacement Units (ORU) on the International Space Station (ISS) into a single database. It was created to help engineers develop a parametric model that relates hardware mass and reliability. MaRS supplies relevant failure data at the lowest possible component level while providing support for risk, reliability, and logistics analysis. Random-failure data is usually linked to the ORU assembly. MaRS uses this data to identify and display the lowest possible component failure level. As seen in Figure 1, the failure point is identified to the lowest level: Component 2.1. This is useful for efficient planning of spare supplies, supporting long duration crewed missions, allowing quicker trade studies, and streamlining diagnostic processes. MaRS is composed of information from various databases: MADS (operating hours), VMDB (indentured part lists), and ISS PART (failure data). This information is organized in Microsoft Excel and accessed through a program made in Microsoft Access (Figure 2). The focus of the Fall 2017 internship tour was to identify the components that were the root cause of failure from the given random-failure data, develop a taxonomy for the database, and attach material headings to the component list. Secondary objectives included verifying the integrity of the data in MaRS, eliminating any part discrepancies, and generating documentation for future reference. Due to the nature of the random-failure data, data mining had to be done manually without the assistance of an automated program to ensure positive identification.

  6. Bearing Procurement Analysis Method by Total Cost of Ownership Analysis and Reliability Prediction

    NASA Astrophysics Data System (ADS)

    Trusaji, Wildan; Akbar, Muhammad; Sukoyo; Irianto, Dradjad

    2018-03-01

    In making bearing procurement analysis, price and its reliability must be considered as decision criteria, since price determines the direct cost as acquisition cost and reliability of bearing determine the indirect cost such as maintenance cost. Despite the indirect cost is hard to identify and measured, it has high contribution to overall cost that will be incurred. So, the indirect cost of reliability must be considered when making bearing procurement analysis. This paper tries to explain bearing evaluation method with the total cost of ownership analysis to consider price and maintenance cost as decision criteria. Furthermore, since there is a lack of failure data when bearing evaluation phase is conducted, reliability prediction method is used to predict bearing reliability from its dynamic load rating parameter. With this method, bearing with a higher price but has higher reliability is preferable for long-term planning. But for short-term planning the cheaper one but has lower reliability is preferable. This contextuality can give rise to conflict between stakeholders. Thus, the planning horizon needs to be agreed by all stakeholder before making a procurement decision.

  7. Ceramic technology for advanced heat engines project. Semiannual progress report, October 1985-March 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-08-01

    Significant accomplishments in fabricating cermaic components for the Department of Energy (DOE), National Aeronautics and Space Administration (NASA), and Department of Defense (DOD) advanced heat engine programs have provided evidence that the operation of ceramic parts in high-temperature engine environments is feasible. However, additional research is needed in materials and processing development, design methodology, and data base and life prediction. An assessment of needs was completed, and a five-year project plan was developed with extensive input from private industry. The objective of the project is to develop the industrial technology base required for reliable ceramics for application in advanced automotivemore » heat engines. The project approach includes determining the mechanisms controlling reliability, improving processes for fabricating existing ceramics, developing new materials with increased reliability, and testing these materials in simulated engine environments to confirm reliability. although this is a generic materials project, the focus is on structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments, and ceramic coatings for thermal barrier and wear applications in these engines.« less

  8. NPOESS Preparatory Project Validation Program for Ocean Data Products from VIIRS

    NASA Astrophysics Data System (ADS)

    Arnone, R.; Jackson, J. M.

    2009-12-01

    The National Polar-orbiting Operational Environmental Satellite Suite (NPOESS) Program, in partnership with National Aeronautical Space Administration (NASA), will launch the NPOESS Preparatory Project (NPP), a risk reduction and data continuity mission, prior to the first operational NPOESS launch. The NPOESS Program, in partnership with Northrop Grumman Aerospace Systems (NGAS), will execute the NPP Validation program to ensure the data products comply with the requirements of the sponsoring agencies. Data from the NPP Visible/Infrared Imager/Radiometer Suite (VIIRS) will be used to produce Environmental Data Records (EDR's) of Ocean Color/Chlorophyll and Sea Surface Temperature. The ocean Cal/Val program is designed to address an “end to end” capability from sensor to end product and is developed based on existing ongoing government satellite ocean remote sensing capabilities that are currently in use with NASA research and Navy and NOAA operational products. Therefore, the plan focuses on the extension of known reliable methods and capabilities currently used with the heritage sensors that will be extended to the NPP and NPOESS ocean product Cal/Val effort. This is not a fully “new” approach but it is designed to be the most reliable and cost effective approach to developing an automated Cal/Val system for VIIRS while retaining highly accurate procedures and protocols. This presentation will provide an overview of the approaches, data and schedule for the validation of the NPP VIIRS Ocean environmental data products.

  9. Mars Exploration 2003 to 2013 - An Integrated Perspective: Time Sequencing the Missions

    NASA Technical Reports Server (NTRS)

    Briggs, G.; McKay, C.

    2000-01-01

    The science goals for the Mars exploration program, together with the HEDS precursor environmental and technology needs, serve as a solid starting point for re-planning the program in an orderly way. Most recently, the community has recognized the significance of subsurface sampling as a key component in "following the water". Accessing samples from hundreds and even thousands of meters beneath the surface is a challenge that will call for technology development and for one or more demonstration missions. Recent mission failures and concerns about the complexity of the previously planned MSR missions indicate that, before we are ready to undertake sample return and deep sampling, the Mars exploration program needs to include: 1) technology development missions; and 2) basic landing site assessment missions. These precursor missions should demonstrate the capability for reliable & accurate soft landing and in situ propellant production. The precursor missions will need to carry out close-up site observations, ground-penetrating radar mapping from orbit and conduct seismic surveys. Clearly the programs should be planned as a single, continuous exploration effort. A prudent minimum list of missions, including surface rovers with ranges of more than 10 km, can be derived from the numerous goals and requirements; they can be sequenced in an orderly way to ensure that time is available to feed forward the results of the precursor missions. One such sequence of missions is proposed for the decade beginning in 2003.

  10. A Statistical Estimate of the Validity and Reliability of a Rubric Developed by Connecticut's State Education Resource Center to Evaluate the Quality of Individualized Education Programs for Students with Disabilities

    ERIC Educational Resources Information Center

    Mearman, Kimberly A.

    2013-01-01

    Because of the critical function of the IEP in the planning and implementation of effective instruction for students with disabilities, educators need a reference to determine the standards of a quality IEP and a process by which to compare an IEP to those standards. A rubric can support educators in examining the quality of IEPs. This study used…

  11. Highly-reliable fly-by-light/power-by-wire technology

    NASA Technical Reports Server (NTRS)

    Pitts, Felix L.

    1993-01-01

    This paper presents in viewgraph format an overview of the program at NASA Langley Research Center to develop fly-by-light/power-by-wire (FBL/PBW) technology. Benefits of FBL/PBW include intrinsic electromagnetic interference (EMI) immunity and lifetime immunity to signal EMI of optics; simplified certification; the elimination of hydraulics, engine bleed air, and variable speed, constant frequency drive; and weight and volume reduction. The paper summarizes a study on the electromagnetic environmental effects on FBL/PBW systems. The paper concludes with FY 1993 plans.

  12. Army Needs to Improve the Reliability of the Spare Parts Forecasts It Submits to the Defense Logistics Agency

    DTIC Science & Technology

    2014-09-29

    In response to this finding, AMC is initiating a Depot Material Requirements Planning ( MRP ) Integrated Process Team (IPT) from which one objective...methodologies for DOF reviews and corrective actions by AMC and its component organizations. The target completion date for the Depot MRP IPT is June...implemented a matrix for MRP SOW where the aviation programs were updated in Production LMP 1QFY14. Army Materiel Command (cont’d) Management

  13. Transmission research activities at NASA Lewis Research Center

    NASA Technical Reports Server (NTRS)

    Lewicki, D. G.

    1990-01-01

    A joint research program, to advance the technology of rotorcraft transmissions, consists of analytical and experimental efforts to achieve the overall goals of reducing transmission weight and noise, while increasing life and reliability. Recent activities in the areas of transmission and related component research are highlighted. Current areas include specific technologies in support of military rotary wing aviation, gearing technology, transmission noise reduction studies, a recent interest in gearbox diagnostics, and advanced transmission system studies. Results of recent activities are presented along with near term research plans.

  14. Test results and flight experience of ball bearing momentum and reaction wheels

    NASA Technical Reports Server (NTRS)

    Auer, W.

    1990-01-01

    The required satellite mission durations and levels of reliability have been considerably increased: While in the beginning of the 70's 3 to 5 year missions were planned, the standard is now 10 years with an expansion to 15 years and more for such programs as INTELSAT VII. Based on a 20 year test and flight experience with basically the same design, ball bearing momentum and reaction wheels with the required 15 year mission capability can be provided.

  15. Crew Transportation Plan

    NASA Technical Reports Server (NTRS)

    Zeitler, Pamela S. (Compiler); Mango, Edward J.

    2013-01-01

    The National Aeronautics and Space Administration (NASA) Commercial Crew Program (CCP) has been chartered to facilitate the development of a United States (U.S.) commercial crew space transportation capability with the goal of achieving safe, reliable, and cost effective access to and from low Earth orbit (LEO) and the International Space Station (ISS) as soon as possible. Once the capability is matured and is available to the Government and other customers, NASA expects to purchase commercial services to meet its ISS crew rotation and emergency return objectives.

  16. Reliability of hybrid photovoltaic DC micro-grid systems for emergency shelters and other applications

    NASA Astrophysics Data System (ADS)

    Dhere, Neelkanth G.; Schleith, Susan

    2014-10-01

    Improvement of energy efficiency in the SunSmart Schools Emergency Shelters requires new methods for optimizing the energy consumption within the shelters. One major limitation in current systems is the requirement of converting direct current (DC) power generated from the PV array into alternating current (AC) power which is distributed throughout the shelters. Oftentimes, this AC power is then converted back to DC to run certain appliances throughout the shelters resulting in a significant waste of energy due to DC to AC and then again AC to DC conversion. This paper seeks to extract the maximum value out of PV systems by directly powering essential load components within the shelters that already run on DC power without the use of an inverter and above all to make the system reliable and durable. Furthermore, additional DC applications such as LED lighting, televisions, computers and fans operated with DC brushless motors will be installed as replacements to traditional devices in order to improve efficiency and reduce energy consumption. Cost of energy storage technologies continue to decline as new technologies scale up and new incentives are put in place. This will provide a cost effective way to stabilize the energy generation of a PV system as well as to provide continuous energy during night hours. It is planned to develop a pilot program of an integrated system that can provide uninterrupted DC power to essential base load appliances (heating, cooling, lighting, etc.) at the Florida Solar Energy Center (FSEC) command center for disaster management. PV arrays are proposed to be installed on energy efficient test houses at FSEC as well as at private homes having PV arrays where the owners volunteer to participate in the program. It is also planned to monitor the performance of the PV arrays and functioning of the appliances with the aim to improve their reliability and durability. After a successful demonstration of the hybrid DC microgrid based emergency shelter together with the monitoring system, it is planned to replicate it at other schools in Florida and elsewhere to provide continuous power for essential applications, maximizing the value of PV generation systems.

  17. Sample size planning for composite reliability coefficients: accuracy in parameter estimation via narrow confidence intervals.

    PubMed

    Terry, Leann; Kelley, Ken

    2012-11-01

    Composite measures play an important role in psychology and related disciplines. Composite measures almost always have error. Correspondingly, it is important to understand the reliability of the scores from any particular composite measure. However, the point estimates of the reliability of composite measures are fallible and thus all such point estimates should be accompanied by a confidence interval. When confidence intervals are wide, there is much uncertainty in the population value of the reliability coefficient. Given the importance of reporting confidence intervals for estimates of reliability, coupled with the undesirability of wide confidence intervals, we develop methods that allow researchers to plan sample size in order to obtain narrow confidence intervals for population reliability coefficients. We first discuss composite reliability coefficients and then provide a discussion on confidence interval formation for the corresponding population value. Using the accuracy in parameter estimation approach, we develop two methods to obtain accurate estimates of reliability by planning sample size. The first method provides a way to plan sample size so that the expected confidence interval width for the population reliability coefficient is sufficiently narrow. The second method ensures that the confidence interval width will be sufficiently narrow with some desired degree of assurance (e.g., 99% assurance that the 95% confidence interval for the population reliability coefficient will be less than W units wide). The effectiveness of our methods was verified with Monte Carlo simulation studies. We demonstrate how to easily implement the methods with easy-to-use and freely available software. ©2011 The British Psychological Society.

  18. Conceptual Design of an In-Space Cryogenic Fluid Management Facility

    NASA Technical Reports Server (NTRS)

    Willen, G. S.; Riemer, D. H.; Hustvedt, D. C.

    1981-01-01

    The conceptual design of a Spacelab experiment to develop the technology associated with low gravity propellant management is presented. The proposed facility consisting of a supply tank, receiver tank, pressurization system, instrumentation, and supporting hardware, is described. The experimental objectives, the receiver tank to be modeled, and constraints imposed on the design by the space shuttle, Spacelab, and scaling requirements, are described. The conceptual design, including the general configurations, flow schematics, insulation systems, instrumentation requirements, and internal tank configurations for the supply tank and the receiver tank, is described. Thermal, structural, fluid, and safety and reliability aspects of the facility are analyzed. The facility development plan, including schedule and cost estimates for the facility, is presented. A program work breakdown structure and master program schedule for a seven year program are included.

  19. Coupling long and short term decisions in the design of urban water supply infrastructure for added reliability and flexibility

    NASA Astrophysics Data System (ADS)

    Marques, G.; Fraga, C. C. S.; Medellin-Azuara, J.

    2016-12-01

    The expansion and operation of urban water supply systems under growing demands, hydrologic uncertainty and water scarcity requires a strategic combination of supply sources for reliability, reduced costs and improved operational flexibility. The design and operation of such portfolio of water supply sources involves integration of long and short term planning to determine what and when to expand, and how much to use of each supply source accounting for interest rates, economies of scale and hydrologic variability. This research presents an integrated methodology coupling dynamic programming optimization with quadratic programming to optimize the expansion (long term) and operations (short term) of multiple water supply alternatives. Lagrange Multipliers produced by the short-term model provide a signal about the marginal opportunity cost of expansion to the long-term model, in an iterative procedure. A simulation model hosts the water supply infrastructure and hydrologic conditions. Results allow (a) identification of trade offs between cost and reliability of different expansion paths and water use decisions; (b) evaluation of water transfers between urban supply systems; and (c) evaluation of potential gains by reducing water system losses as a portfolio component. The latter is critical in several developing countries where water supply system losses are high and often neglected in favor of more system expansion.

  20. Aging management program of the reactor building concrete at Point Lepreau Generating Station

    NASA Astrophysics Data System (ADS)

    Aldea, C.-M.; Shenton, B.; Demerchant, M. M.; Gendron, T.

    2011-04-01

    In order for New Brunswick Power Nuclear (NBPN) to control the risks of degradation of the concrete reactor building at the Point Lepreau Generating Station (PLGS) the development of an aging management plan (AMP) was initiated. The intention of this plan was to determine the requirements for specific structural components of concrete of the reactor building that require regular inspection and maintenance to ensure the safe and reliable operation of the plant. The document is currently in draft form and presents an integrated methodology for the application of an AMP for the concrete of the reactor building. The current AMP addresses the reactor building structure and various components, such as joint sealant and liners that are integral to the structure. It does not include internal components housed within the structure. This paper provides background information regarding the document developed and the strategy developed to manage potential degradation of the concrete of the reactor building, as well as specific programs and preventive and corrective maintenance activities initiated.

  1. Multileaf collimator characteristics and reliability requirements for IMRT Elekta system.

    PubMed

    Liu, Chihray; Simon, Thomas A; Fox, Christopher; Li, Jonathan; Palta, Jatinder R

    2008-01-01

    Understanding the characteristics of a multileaf collimator (MLC) system, modeling MLC in a treatment planning system, and maintaining the mechanical accuracy of the linear accelerator gantry head system are important factors in the safe implementation of an intensity-modulated radiotherapy program. We review the characteristics of an Elekta MLC system, discuss the necessary MLC modeling parameters for a treatment planning system, and provide a novel method to establish an MLC leaf position quality assurance program. To perform quality assurance on 40 pairs of individual MLC leaves is a time-consuming and difficult task. In this report, an effective routine MLC quality assurance method based on the field edge of a backup jaw as referenced in conjunction with a diode array as a radiation detector system is discussed. The sensitivity of this test for determining the relative leaf positions was observed to be better than 0.1 mm. The Elekta MLC leaf position accuracy measured with this system has been better than 0.3 mm.

  2. Temporary Shell Proof-of-Concept Technique: Digital-Assisted Workflow to Enable Customized Immediate Function in Two Visits in Partially Edentulous Patients

    PubMed

    Pozzi, Alessandro; Arcuri, Lorenzo; Moy, Peter K

    2018-03-01

    The growing interest in minimally invasive implant placement and delivery of a prefabricated provisional prosthesis immediately, thus minimizing "time to teeth," has led to the development of numerous 3-dimensional (3D) planning software programs. Given the enhancements associated with fully digital workflows, such as better 3D soft-tissue visualization and virtual tooth rendering, computer-guided implant surgery and immediate function has become an effective and reliable procedure. This article describes how modern implant planning software programs provide a comprehensive digital platform that enables efficient interplay between the surgical and restorative aspects of implant treatment. These new technologies that streamline the overall digital workflow allow transformation of the digital wax-up into a personalized, CAD/CAM-milled provisional restoration. Thus, collaborative digital workflows provide a novel approach for time-efficient delivery of a customized, screw-retained provisional restoration on the day of implant surgery, resulting in improved predictability for immediate function in the partially edentate patient.

  3. Ring-like reliable PON planning with physical constraints for a smart grid

    NASA Astrophysics Data System (ADS)

    Wang, Xin; Gu, Rentao; Ji, Yuefeng

    2016-01-01

    Due to the high reliability requirements in the communication networks of a smart grid, a ring-like reliable PON is an ideal choice to carry power distribution information. Economical network planning is also very important for the smart grid communication infrastructure. Although the ring-like reliable PON has been widely used in the real applications, as far as we know, little research has been done on the network optimization subject of the ring-like reliable PON. Most PON planning research studies only consider a star-like topology or cascaded PON network, which barely guarantees the reliability requirements of the smart grid. In this paper, we mainly investigate the economical network planning problem for the ring-like reliable PON of the smart grid. To address this issue, we built a mathematical model for the planning problem of the ring-like reliable PON, and the objective was to minimize the total deployment costs under physical constraints. The model is simplified such that all of the nodes have the same properties, except OLT, because each potential splitter site can be located in the same ONU position in power communication networks. The simplified model is used to construct an optimal main tree topology in the complete graph and a backup-protected tree topology in the residual graph. An efficient heuristic algorithm, called the Constraints and Minimal Weight Oriented Fast Searching Algorithm (CMW-FSA), is proposed. In CMW-FSA, a feasible solution can be obtained directly with oriented constraints and a few recursive search processes. From the simulation results, the proposed planning model and CMW-FSA are verified to be accurate (the error rates are less than 0.4%) and effective compared with the accurate solution (CAESA), especially in small and sparse scenarios. The CMW-FSA significantly reduces the computation time compared with the CAESA. The time complexity algorithm of the CMW-FSA is acceptable and calculated as T(n) = O(n3). After evaluating the effects of the parameters of the two PON systems, the total planning costs of each scenario show a general declining trend and reach a threshold as the respective maximal transmission distances and maximal time delays increase.

  4. Structural evaluation of a DTHR bundle divertor particle collector

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Prevenslik, T.V.

    1980-09-01

    The purpose of this report is to present a structural evaluation of the current bundle divertor particle collector BDPC design under a peak heat flux in relation to criteria that protect against coolant leakage into the plasma over replacement schedules planned during DTHR operation. In addition, an assessment of the BDPC structural integrity at higher heat fluxes is presented. Further, recommendations for modifications in the current BDPC design that would improve design reliability to be considered in future design studies are described. Finally, experimental test programs directed to establishing materials data necessary in providing greater confidence in subsequent structural evaluationsmore » of BDPC designs in relation to coolant leakage over planned replacement schedules are identified.« less

  5. Crane Cell Testing Support of NASA/Goddard Space Flight Center: An Update

    NASA Technical Reports Server (NTRS)

    Strawn, Mike; David, Jerry; Rao, Gopalakrishna M.

    2001-01-01

    The objectives presented in this viewgraph presentation include: 1) Verify the quality and reliability of aerospace battery cells and batteries for NASA flight programs; 2) Disseminate the data to develop a plan for in-orbit battery management and to design a cell/battery for future NASA spacecraft; and 3) Establish a cell test data base for rechargeable cell/batteries. In summary: quality EPT Ni-H2, EPT Super NiCd and SAFT NiCd cells have been demonstrated for aerospace applications; the data has been provided to NASA Centers and other agencies for their use and application; developed plan and used in NASA in-orbit battery management. Database on rechargeable cell/batteries is now available for customer use.

  6. Towards a global terrestrial species monitoring program

    USGS Publications Warehouse

    Schmeller, Dirk S.; Julliard, Romain; Bellingham, Peter J.; Böhm, Monika; Brummitt, Neil; Chiarucci, Alessandro; Couvet, Denis; Elmendorf, Sarah; Forsyth, David M.; Moreno, Jaime García; Gregory, Richard D.; Magnusson, William E.; Martin, Laura J.; McGeoch, Melodie A.; Mihoub, Jean-Baptiste; Pereira, Henrique M.; Proença, Vânia; van Swaay, Chris A.M.; Yahara, Tetsukazu; Belnap, Jayne

    2015-01-01

    Introduction: The Convention for Biological Diversity’s (CBD) Strategic Plan for Biodiversity 2011-2020 envisions that “By 2050, biodiversity is valued, conserved, restored and wisely used, maintaining ecosystem services, sustaining a healthy planet and delivering benefits essential for all people.” Although 193 parties have adopted these goals, there is little infrastructure in place to monitor global biodiversity trends. Recent international conservation policy requires such data to be up-to-date, reliable, comparable among sites, relevant, and understandable; as is becoming obvious from the work plan adopted by the Intergovernmental Panel for Biodiversity and Ecosystem Services (IPBES: www.ipbes.net/; http://tinyurl.com/ohdnknq). In order to meet the five strategic goals of the Strategic Plan for Biodiversity 2011-2020 and its 20 accompanying Aichi Targets for 2020 (www.cbd.int/sp/targets/), advances need to be made in coordinating large-scale biodiversity monitoring and linking these with environmental data to develop a comprehensive Global Observation Network, as is the main idea behind GEOSS the Global Earth Observation System of Systems (Christian 2005)...Here we identify ten requirements important for the successful implementation of a global biodiversity monitoring network under the flag of GEO BON and especially a global terrestrial species monitoring program.

  7. NIF Operations Management Plan, August 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Wonterghem, Bruno M.

    Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in themore » laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the requirements, document flow down, organizational vision and mission, performance metrics, and interrelationship of the NIF Operations organization with other directorate and laboratory organizations. This document also provides a listing of roles and responsibilities, core processes, procedures, authority matrices, change control boards, and other information necessary for successfully functioning in the NIF Operations organization. This document, the NIF Shot Operations Plan, and the NIF Maintenance Plan together represent the primary documents satisfying our Conduct of Operations compliance requirement.« less

  8. Hotol and Saenger are good political trump cards

    NASA Astrophysics Data System (ADS)

    Ruppe, Harry O.

    Political and technological aspects of proposals for ESA reusable and/or SSTO launch vehicles (LVs) are examined in a critical review. The lack of reliable performance and cost estimates for such unconventional LV designs as Hotol, Saenger II, LART, ADV, and EARL is pointed out, and it is argued that progress toward the ESA goal of greater European space autonomy could be seriously endangered by abandoning or underfunding the current Ariane/Hermes LV program. The cost and reliability of expendable and reusable LV systems are discussed; two-stage and hybrid air-breathing engine concepts are compared; and the need for fundamental in-depth planning studies based on presently available technology or realistic projections is stressed. Long-term funding of such research at about 5 percent of present Ariane/Hermes levels is recommended.

  9. Toward an electrical power utility for space exploration

    NASA Technical Reports Server (NTRS)

    Bercaw, Robert W.

    1989-01-01

    Plans for space exploration depend on today's technology programs addressing the novel requirements of space-based enterprise. The requirements for electrical power will be formidable: megawatts in magnitude, reliability for multi-year missions and the flexibility to adapt to needs unanticipated at design time. The reasons for considering the power management and distribution in the various systems from a total mission perspective, rather than simply extrapolating current spacecraft design practice, are discussed. A utility approach to electric power being developed at the Lewis Research Center is described. It integrates requirements from a broad selection of current development programs with studies in which both space and terrestrial technologies are conceptually applied to exploration mission scenarios.

  10. Logistical considerations for establishing reliable surgical telementoring programs: a report of the SAGES Project 6 Logistics Working Group.

    PubMed

    Camacho, Diego R; Schlachta, Christopher M; Serrano, Oscar K; Nguyen, Ninh T

    2018-03-30

    Surgical telementoring programs (STMPs) as educational tools have consistently demonstrated success in the training of surgeons in a variety of surgical disciplines. The goal of an STMP is to train and educate practicing surgeons by improving or remediating surgical skills or assisting in the safe adoption of new procedures. STMPs may even have a role in assisting with recertification. In 2015, the Society of American Gastrointestinal and Endoscopic Surgeons (SAGES) launched the SAGES Telementoring Initiative at the Project 6 Summit. Herein, we provide a report on the SAGES Project 6 Logistics working group and lay out a plan for the recommended logistical framework to carry out an STMP.

  11. Development of Constellation's Launch Control System

    NASA Technical Reports Server (NTRS)

    Lougheed, Kirk D.; Peaden, Cary J.

    2010-01-01

    The paper focuses on the National Aeronautics and Space Administration (NASA) Constellation Program's Launch Control System (LCS) development effort at Kennedy Space Center (KSC). It provides a brief history of some preceding efforts to provide launch control and ground processing systems for other NASA programs, and some lessons learned from those experiences. It then provides high level descriptions of the LCS mission, objectives, organization, architecture, and progress. It discusses some of our development tenets, including our use of standards based design and use of off-the-shelf products whenever possible, incremental development cycles, and highly reliable, available, and supportable enterprise class system servers. It concludes with some new lessons learned and our plans for the future.

  12. Validation of a Theory of Planned Behavior-Based Questionnaire to Examine Factors Associated With Milk Expression.

    PubMed

    Bai, Yeon K; Dinour, Lauren M

    2017-11-01

    A proper assessment of multidimensional needs for breastfeeding mothers in various settings is crucial to facilitate and support breastfeeding and its exclusivity. The theory of planned behavior (TPB) has been used frequently to measure factors associated with breastfeeding. Full utility of the TPB requires accurate measurement of theory constructs. Research aim: This study aimed to develop and confirm the psychometric properties of an instrument, Milk Expression on Campus, based on the TPB and to establish the reliability and validity of the instrument. In spring 2015, 218 breastfeeding (current or in the recent past) employees and students at one university campus in northern New Jersey completed the online questionnaire containing demography and theory-based items. Internal consistency (α) and split-half reliability ( r) tests and factor analyses established and confirmed the reliability and construct validity of this instrument. Milk Expression on Campus showed strong and significant reliabilities as a full scale (α = .78, r = .74, p < .001) and theory construct subscales. Validity was confirmed as psychometric properties corresponded to the factors extracted from the scale. Four factors extracted from the direct construct subscales accounted for 79.49% of the total variability. Four distinct factors from the indirect construct subscales accounted for 73.68% of the total variability. Milk Expression on Campus can serve as a model TPB-based instrument to examine factors associated with women's milk expression behavior. The utility of this instrument extends to designing effective promotion programs to foster breastfeeding and milk expression behaviors in diverse settings.

  13. Many-objective optimization and visual analytics reveal key trade-offs for London's water supply

    NASA Astrophysics Data System (ADS)

    Matrosov, Evgenii S.; Huskova, Ivana; Kasprzyk, Joseph R.; Harou, Julien J.; Lambert, Chris; Reed, Patrick M.

    2015-12-01

    In this study, we link a water resource management simulator to multi-objective search to reveal the key trade-offs inherent in planning a real-world water resource system. We consider new supplies and demand management (conservation) options while seeking to elucidate the trade-offs between the best portfolios of schemes to satisfy projected water demands. Alternative system designs are evaluated using performance measures that minimize capital and operating costs and energy use while maximizing resilience, engineering and environmental metrics, subject to supply reliability constraints. Our analysis shows many-objective evolutionary optimization coupled with state-of-the art visual analytics can help planners discover more diverse water supply system designs and better understand their inherent trade-offs. The approach is used to explore future water supply options for the Thames water resource system (including London's water supply). New supply options include a new reservoir, water transfers, artificial recharge, wastewater reuse and brackish groundwater desalination. Demand management options include leakage reduction, compulsory metering and seasonal tariffs. The Thames system's Pareto approximate portfolios cluster into distinct groups of water supply options; for example implementing a pipe refurbishment program leads to higher capital costs but greater reliability. This study highlights that traditional least-cost reliability constrained design of water supply systems masks asset combinations whose benefits only become apparent when more planning objectives are considered.

  14. Development and preliminary validation of a questionnaire to measure satisfaction with home care in Greece: an exploratory factor analysis of polychoric correlations

    PubMed Central

    2010-01-01

    Background The primary aim of this study was to develop and psychometrically test a Greek-language instrument for measuring satisfaction with home care. The first empirical evidence about the level of satisfaction with these services in Greece is also provided. Methods The questionnaire resulted from literature search, on-site observation and cognitive interviews. It was applied in 2006 to a sample of 201 enrollees of five home care programs in the city of Thessaloniki and contains 31 items that measure satisfaction with individual service attributes and are expressed on a 5-point Likert scale. The latter has been usually considered in practice as an interval scale, although it is in principle ordinal. We thus treated the variable as an ordinal one, but also employed the traditional approach in order to compare the findings. Our analysis was therefore based on ordinal measures such as the polychoric correlation, Kendall's Tau b coefficient and ordinal Cronbach's alpha. Exploratory factor analysis was followed by an assessment of internal consistency reliability, test-retest reliability, construct validity and sensitivity. Results Analyses with ordinal and interval scale measures produced in essence very similar results and identified four multi-item scales. Three of these were found to be reliable and valid: socioeconomic change, staff skills and attitudes and service appropriateness. A fourth dimension -service planning- had lower internal consistency reliability and yet very satisfactory test-retest reliability, construct validity and floor and ceiling effects. The global satisfaction scale created was also quite reliable. Overall, participants were satisfied -yet not very satisfied- with home care services. More room for improvement seems to exist for the socio-economic and planning aspects of care and less for staff skills and attitudes and appropriateness of provided services. Conclusions The methods developed seem to be a promising tool for the measurement of home care satisfaction in Greece. PMID:20602759

  15. The Acceptance Strategy for Nuclear Power Plant In Indonesia

    NASA Astrophysics Data System (ADS)

    Suhaemi, Tjipta; Syaukat, Achmad

    2010-06-01

    THE ACCEPTANCE STRATEGY FOR NUCLEAR POWER PLANT IN INDONESIA. Indonesia has planned to build nuclear power plants. Some feasibility studies have been conducted intensively. However, the processes of NPP introduction are still uncertain. National Energy Plan in Indonesia, which has been made by some governmental agencies, does not yet give positive impact to the government decision to construct the nuclear power plant (NPP). This paper discusses the process of NPP introduction in Indonesia, which has been colored with debate of stakeholder and has delayed decision for go-nuclear. The technology paradigm is used to promote NPP as an alternative of reliable energy resources. This paradigm should be complemented with international politic-economic point of view. The international politic-economic point of view shows that structural powers, consisting of security, production, finance, and knowledge structures, within which the NPP is introduced, have dynamic characteristics. The process of NPP introduction in Indonesia contains some infrastructure development (R&D, legislation, regulation, energy planning, site study, public acceptance efforts, etc), but they need a better coherent NPP implementation program and NPP Acceptance Program. Strategic patterns for NPP acceptance described in this paper are made by considering nuclear regulation development and the interest of basic domestic participation. The first NPP program in Indonesia having proven technology and basic domestic participation is and important milestone toward and optimal national energy-mix.

  16. Light Water Reactor Sustainability Program Integrated Program Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCarthy, Kathryn A.; Busby, Jeremy; Hallbert, Bruce

    2014-04-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution tomore » the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.« less

  17. Developing Ultra Reliable Life Support for the Moon and Mars

    NASA Technical Reports Server (NTRS)

    Jones, Harry W.

    2009-01-01

    Recycling life support systems can achieve ultra reliability by using spares to replace failed components. The added mass for spares is approximately equal to the original system mass, provided the original system reliability is not very low. Acceptable reliability can be achieved for the space shuttle and space station by preventive maintenance and by replacing failed units, However, this maintenance and repair depends on a logistics supply chain that provides the needed spares. The Mars mission must take all the needed spares at launch. The Mars mission also must achieve ultra reliability, a very low failure rate per hour, since it requires years rather than weeks and cannot be cut short if a failure occurs. Also, the Mars mission has a much higher mass launch cost per kilogram than shuttle or station. Achieving ultra reliable space life support with acceptable mass will require a well-planned and extensive development effort. Analysis must define the reliability requirement and allocate it to subsystems and components. Technologies, components, and materials must be designed and selected for high reliability. Extensive testing is needed to ascertain very low failure rates. Systems design should segregate the failure causes in the smallest, most easily replaceable parts. The systems must be designed, produced, integrated, and tested without impairing system reliability. Maintenance and failed unit replacement should not introduce any additional probability of failure. The overall system must be tested sufficiently to identify any design errors. A program to develop ultra reliable space life support systems with acceptable mass must start soon if it is to produce timely results for the moon and Mars.

  18. Improving The Discipline of Cost Estimation and Analysis

    NASA Technical Reports Server (NTRS)

    Piland, William M.; Pine, David J.; Wilson, Delano M.

    2000-01-01

    The need to improve the quality and accuracy of cost estimates of proposed new aerospace systems has been widely recognized. The industry has done the best job of maintaining related capability with improvements in estimation methods and giving appropriate priority to the hiring and training of qualified analysts. Some parts of Government, and National Aeronautics and Space Administration (NASA) in particular, continue to need major improvements in this area. Recently, NASA recognized that its cost estimation and analysis capabilities had eroded to the point that the ability to provide timely, reliable estimates was impacting the confidence in planning many program activities. As a result, this year the Agency established a lead role for cost estimation and analysis. The Independent Program Assessment Office located at the Langley Research Center was given this responsibility. This paper presents the plans for the newly established role. Described is how the Independent Program Assessment Office, working with all NASA Centers, NASA Headquarters, other Government agencies, and industry, is focused on creating cost estimation and analysis as a professional discipline that will be recognized equally with the technical disciplines needed to design new space and aeronautics activities. Investments in selected, new analysis tools, creating advanced training opportunities for analysts, and developing career paths for future analysts engaged in the discipline are all elements of the plan. Plans also include increasing the human resources available to conduct independent cost analysis of Agency programs during their formulation, to improve near-term capability to conduct economic cost-benefit assessments, to support NASA management's decision process, and to provide cost analysis results emphasizing "full-cost" and "full-life cycle" considerations. The Agency cost analysis improvement plan has been approved for implementation starting this calendar year. Adequate financial and human resources are being made available to accomplish the goals of this important effort, and all indications are that NASA's cost estimation and analysis core competencies will be substantially improved within the foreseeable future.

  19. Transit Reliability Information Program : PATCO-WMATA Propulsion System Reliability/Productivity Analysis

    DOT National Transportation Integrated Search

    1984-10-01

    The Transit Reliability Information Program (TRIP) is a government-initiated program to assist the transit industry in satisfying its need for transit reliability information. TRIP provides this assistance through the operation of a national data ban...

  20. Ultra Reliable Closed Loop Life Support for Long Space Missions

    NASA Technical Reports Server (NTRS)

    Jones, Harry W.; Ewert, Michael K.

    2010-01-01

    Spacecraft human life support systems can achieve ultra reliability by providing sufficient spares to replace all failed components. The additional mass of spares for ultra reliability is approximately equal to the original system mass, provided that the original system reliability is not too low. Acceptable reliability can be achieved for the Space Shuttle and Space Station by preventive maintenance and by replacing failed units. However, on-demand maintenance and repair requires a logistics supply chain in place to provide the needed spares. In contrast, a Mars or other long space mission must take along all the needed spares, since resupply is not possible. Long missions must achieve ultra reliability, a very low failure rate per hour, since they will take years rather than weeks and cannot be cut short if a failure occurs. Also, distant missions have a much higher mass launch cost per kilogram than near-Earth missions. Achieving ultra reliable spacecraft life support systems with acceptable mass will require a well-planned and extensive development effort. Analysis must determine the reliability requirement and allocate it to subsystems and components. Ultra reliability requires reducing the intrinsic failure causes, providing spares to replace failed components and having "graceful" failure modes. Technologies, components, and materials must be selected and designed for high reliability. Long duration testing is needed to confirm very low failure rates. Systems design should segregate the failure causes in the smallest, most easily replaceable parts. The system must be designed, developed, integrated, and tested with system reliability in mind. Maintenance and reparability of failed units must not add to the probability of failure. The overall system must be tested sufficiently to identify any design errors. A program to develop ultra reliable space life support systems with acceptable mass should start soon since it must be a long term effort.

  1. Superconducting magnet development for tokamaks and mirrors: a technical assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laverick, C.; Jacobs, R. B.; Boom, R. W.

    1977-11-01

    The role of superconducting magnets in Magnetic Fusion Energy Research and Development is assessed from a consideration of program plans and schedules, the present status of the programs and the research and development suggestions arising from recent studies and workshops. A principal conclusion is that the large superconducting magnet systems needed for commercial magnetic fusion reactors can be constructed. However such magnets working under severe conditions, with increasingly stringent reliability, safety and cost restrictions can never be built unless experience is first gained in a number of important installations designed to prove physics and technology steps on the way tomore » commercial power demonstration. The immediate problem is to design a technology program in the absence of definite device needs and specifications, giving a priority weighting to the multiplicity of good, high quality development program suggestions when all proposals cannot be supported.« less

  2. Bulk electric system reliability evaluation incorporating wind power and demand side management

    NASA Astrophysics Data System (ADS)

    Huang, Dange

    Electric power systems are experiencing dramatic changes with respect to structure, operation and regulation and are facing increasing pressure due to environmental and societal constraints. Bulk electric system reliability is an important consideration in power system planning, design and operation particularly in the new competitive environment. A wide range of methods have been developed to perform bulk electric system reliability evaluation. Theoretically, sequential Monte Carlo simulation can include all aspects and contingencies in a power system and can be used to produce an informative set of reliability indices. It has become a practical and viable tool for large system reliability assessment technique due to the development of computing power and is used in the studies described in this thesis. The well-being approach used in this research provides the opportunity to integrate an accepted deterministic criterion into a probabilistic framework. This research work includes the investigation of important factors that impact bulk electric system adequacy evaluation and security constrained adequacy assessment using the well-being analysis framework. Load forecast uncertainty is an important consideration in an electrical power system. This research includes load forecast uncertainty considerations in bulk electric system reliability assessment and the effects on system, load point and well-being indices and reliability index probability distributions are examined. There has been increasing worldwide interest in the utilization of wind power as a renewable energy source over the last two decades due to enhanced public awareness of the environment. Increasing penetration of wind power has significant impacts on power system reliability, and security analyses become more uncertain due to the unpredictable nature of wind power. The effects of wind power additions in generating and bulk electric system reliability assessment considering site wind speed correlations and the interactive effects of wind power and load forecast uncertainty on system reliability are examined. The concept of the security cost associated with operating in the marginal state in the well-being framework is incorporated in the economic analyses associated with system expansion planning including wind power and load forecast uncertainty. Overall reliability cost/worth analyses including security cost concepts are applied to select an optimal wind power injection strategy in a bulk electric system. The effects of the various demand side management measures on system reliability are illustrated using the system, load point, and well-being indices, and the reliability index probability distributions. The reliability effects of demand side management procedures in a bulk electric system including wind power and load forecast uncertainty considerations are also investigated. The system reliability effects due to specific demand side management programs are quantified and examined in terms of their reliability benefits.

  3. Human Factors Engineering Program Review Model (NUREG-0711)Revision 3: Update Methodology and Key Revisions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    OHara J. M.; Higgins, J.; Fleger, S.

    The U.S. Nuclear Regulatory Commission (NRC) reviews the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodicmore » update and improvement of the guidance to ensure that it remains a state-of-the-art design evaluation tool. To this end, the NRC is updating its guidance to stay current with recent research on human performance, advances in HFE methods and tools, and new technology being employed in plant and control room design. NUREG-0711 is the first document to be addressed. We present the methodology used to update NUREG-0711 and summarize the main changes made. Finally, we discuss the current status of the update program and the future plans.« less

  4. 10 CFR 712.1 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... HUMAN RELIABILITY PROGRAM Establishment of and Procedures for the Human Reliability Program General Provisions § 712.1 Purpose. This part establishes the policies and procedures for a Human Reliability Program... judgment and reliability may be impaired by physical or mental/personality disorders, alcohol abuse, use of...

  5. 78 FR 63036 - Transmission Planning Reliability Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... blend of specific quantitative and qualitative parameters for the permissible use of planned non... circumstances, Reliability Standard TPL-001-4 provides a blend of specific quantitative and qualitative... considerations, such as costs and alternatives, guards against a determination based solely on a quantitative...

  6. Twenty-Five Year Site Plan FY2013 - FY2037

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jones, William H.

    2012-07-12

    Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also usesmore » the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual basis. At the same time, major modernization projects will require new line-item funding. This document is, in essence, a roadmap that defines a path forward for the Laboratory to modernize, streamline, consolidate, and sustain its infrastructure to meet its national security mission.« less

  7. Catching errors with patient-specific pretreatment machine log file analysis.

    PubMed

    Rangaraj, Dharanipathy; Zhu, Mingyao; Yang, Deshan; Palaniswaamy, Geethpriya; Yaddanapudi, Sridhar; Wooten, Omar H; Brame, Scott; Mutic, Sasa

    2013-01-01

    A robust, efficient, and reliable quality assurance (QA) process is highly desired for modern external beam radiation therapy treatments. Here, we report the results of a semiautomatic, pretreatment, patient-specific QA process based on dynamic machine log file analysis clinically implemented for intensity modulated radiation therapy (IMRT) treatments delivered by high energy linear accelerators (Varian 2100/2300 EX, Trilogy, iX-D, Varian Medical Systems Inc, Palo Alto, CA). The multileaf collimator machine (MLC) log files are called Dynalog by Varian. Using an in-house developed computer program called "Dynalog QA," we automatically compare the beam delivery parameters in the log files that are generated during pretreatment point dose verification measurements, with the treatment plan to determine any discrepancies in IMRT deliveries. Fluence maps are constructed and compared between the delivered and planned beams. Since clinical introduction in June 2009, 912 machine log file analyses QA were performed by the end of 2010. Among these, 14 errors causing dosimetric deviation were detected and required further investigation and intervention. These errors were the result of human operating mistakes, flawed treatment planning, and data modification during plan file transfer. Minor errors were also reported in 174 other log file analyses, some of which stemmed from false positives and unreliable results; the origins of these are discussed herein. It has been demonstrated that the machine log file analysis is a robust, efficient, and reliable QA process capable of detecting errors originating from human mistakes, flawed planning, and data transfer problems. The possibility of detecting these errors is low using point and planar dosimetric measurements. Copyright © 2013 American Society for Radiation Oncology. Published by Elsevier Inc. All rights reserved.

  8. 76 FR 73608 - Reliability Technical Conference, North American Electric Reliability Corporation, Public Service...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... or municipal authority play in forming your bulk power system reliability plans? b. Do you support..., North American Electric Reliability Corporation (NERC) Nick Akins, CEO of American Electric Power (AEP..., EL11-62-000] Reliability Technical Conference, North American Electric Reliability Corporation, Public...

  9. A high-fidelity N-body ephemeris generator for satellites in Earth orbit

    NASA Astrophysics Data System (ADS)

    Simmons, David R.

    1991-10-01

    A program is currently used for mission planning called the Analytic Satellite Ephemeris Program (ASEP), which produces projected data for orbits that remain fairly close to Earth. Lunar and solar perturbations are taken into account in another program called GRAVE. This project is a revision of GRAVE which incorporates more flexible means of input for initial data, provides additional kinds of output information, and makes use of structured programming techniques to make the program more understandable and reliable. The computer program ORBIT was tested against tracking data for the first 313 days of operation of the CRRES satellite. A sample graph is given comparing the semi-major axis calculated by the program with the values supplied by NORAD. When calculated for points at which CRRES passes through the ascending node, the argument of perigee, the right ascension of the ascending node, and the mean anomaly all stay within about a degree of the corresponding values from NORAD; the inclination of the orbital plane is much closer. The program value of the eccentricity is in error by no more than 0.0002.

  10. Creating High Reliability in Health Care Organizations

    PubMed Central

    Pronovost, Peter J; Berenholtz, Sean M; Goeschel, Christine A; Needham, Dale M; Sexton, J Bryan; Thompson, David A; Lubomski, Lisa H; Marsteller, Jill A; Makary, Martin A; Hunt, Elizabeth

    2006-01-01

    Objective The objective of this paper was to present a comprehensive approach to help health care organizations reliably deliver effective interventions. Context Reliability in healthcare translates into using valid rate-based measures. Yet high reliability organizations have proven that the context in which care is delivered, called organizational culture, also has important influences on patient safety. Model for Improvement Our model to improve reliability, which also includes interventions to improve culture, focuses on valid rate-based measures. This model includes (1) identifying evidence-based interventions that improve the outcome, (2) selecting interventions with the most impact on outcomes and converting to behaviors, (3) developing measures to evaluate reliability, (4) measuring baseline performance, and (5) ensuring patients receive the evidence-based interventions. The comprehensive unit-based safety program (CUSP) is used to improve culture and guide organizations in learning from mistakes that are important, but cannot be measured as rates. Conclusions We present how this model was used in over 100 intensive care units in Michigan to improve culture and eliminate catheter-related blood stream infections—both were accomplished. Our model differs from existing models in that it incorporates efforts to improve a vital component for system redesign—culture, it targets 3 important groups—senior leaders, team leaders, and front line staff, and facilitates change management—engage, educate, execute, and evaluate for planned interventions. PMID:16898981

  11. Electric service reliability cost/worth assessment in a developing country

    NASA Astrophysics Data System (ADS)

    Pandey, Mohan Kumar

    Considerable work has been done in developed countries to optimize the reliability of electric power systems on the basis of reliability cost versus reliability worth. This has yet to be considered in most developing countries, where development plans are still based on traditional deterministic measures. The difficulty with these criteria is that they cannot be used to evaluate the economic impacts of changing reliability levels on the utility and the customers, and therefore cannot lead to an optimum expansion plan for the system. The critical issue today faced by most developing countries is that the demand for electric power is high and growth in supply is constrained by technical, environmental, and most importantly by financial impediments. Many power projects are being canceled or postponed due to a lack of resources. The investment burden associated with the electric power sector has already led some developing countries into serious debt problems. This thesis focuses on power sector issues facing by developing countries and illustrates how a basic reliability cost/worth approach can be used in a developing country to determine appropriate planning criteria and justify future power projects by application to the Nepal Integrated Electric Power System (NPS). A reliability cost/worth based system evaluation framework is proposed in this thesis. Customer surveys conducted throughout Nepal using in-person interviews with approximately 2000 sample customers are presented. The survey results indicate that the interruption cost is dependent on both customer and interruption characteristics, and it varies from one location or region to another. Assessments at both the generation and composite system levels have been performed using the customer cost data and the developed NPS reliability database. The results clearly indicate the implications of service reliability to the electricity consumers of Nepal, and show that the reliability cost/worth evaluation is both possible and practical in a developing country. The average customer interruption costs of Rs 35/kWh at Hierarchical Level I and Rs 26/kWh at Hierarchical Level II evaluated in this research work led to an optimum reserve margin of 7.5%, which is considerably lower than the traditional reserve margin of 15% used in the NPS. A similar conclusion may result in other developing countries facing difficulties in power system expansion planning using the traditional approach. A new framework for system planning is therefore recommended for developing countries which would permit an objective review of the traditional system planning approach, and the evaluation of future power projects using a new approach based on fundamental principles of power system reliability and economics.

  12. Orbit Transfer Rocket Engine Technology Program: Advanced engine study, task D.1/D.3

    NASA Technical Reports Server (NTRS)

    Martinez, A.; Erickson, C.; Hines, B.

    1986-01-01

    Concepts for space maintainability of OTV engines were examined. An engine design was developed which was driven by space maintenance requirements and by a failure mode and effects (FME) analysis. Modularity within the engine was shown to offer cost benefits and improved space maintenance capabilities. Space operable disconnects were conceptualized for both engine change-out and for module replacement. Through FME mitigation the modules were conceptualized to contain the least reliable and most often replaced engine components. A preliminary space maintenance plan was developed around a controls and condition monitoring system using advanced sensors, controls, and condition monitoring concepts. A complete engine layout was prepared satisfying current vehicle requirements and utilizing projected component advanced technologies. A technology plan for developing the required technology was assembled.

  13. SRB/SLEEC (Solid Rocket Booster/Shingle Lap Extendible Exit Cone) feasibility study, volume 1

    NASA Technical Reports Server (NTRS)

    Baker, William H., Jr.

    1986-01-01

    A preliminary design and analysis was completed for a SLEEC (Shingle Lap Extendible Exit Cone) which could be incorporated on the Space Transportation System (STS) Solid Rocket Booster (SRB). Studies were completed which predicted weights and performance increases and development plans were prepared for the full-scale bench and static test of SLEEC. In conjunction with the design studies, a series of supporting analyses were performed to assure the validity and feasibility of performance, fabrication, cost, and reliability for the selected design. The feasibility and required amounts of bench, static firing, and flight tests considered necessary for the successful incorporation of SLEEC on the Shuttle SRBs were determined. Preliminary plans were completed which define both a follow on study effort and a development program.

  14. High resolution infrared datasets useful for validating stratospheric models

    NASA Technical Reports Server (NTRS)

    Rinsland, Curtis P.

    1992-01-01

    An important objective of the High Speed Research Program (HSRP) is to support research in the atmospheric sciences that will improve the basic understanding of the circulation and chemistry of the stratosphere and lead to an interim assessment of the impact of a projected fleet of High Speed Civil Transports (HSCT's) on the stratosphere. As part of this work, critical comparisons between models and existing high quality measurements are planned. These comparisons will be used to test the reliability of current atmospheric chemistry models. Two suitable sets of high resolution infrared measurements are discussed.

  15. Hydrogen Fueling Station in Honolulu, Hawaii Feasibility Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Porter Hill; Michael Penev

    2014-08-01

    The Department of Energy Hydrogen & Fuel Cells Program Plan (September 2011) identifies the use of hydrogen for government and fleet electric vehicles as a key step for achieving “reduced greenhouse gas emissions; reduced oil consumption; expanded use of renewable power …; highly efficient energy conversion; fuel flexibility …; reduced air pollution; and highly reliable grid-support.” This report synthesizes several pieces of existing information that can inform a decision regarding the viability of deploying a hydrogen (H2) fueling station at the Fort Armstrong site in Honolulu, Hawaii.

  16. Advanced wiring technique and hardware application: Airplane and space vehicle

    NASA Technical Reports Server (NTRS)

    Ernst, H. L.; Eichman, C. D.

    1972-01-01

    An advanced wiring system is described which achieves the safety/reliability required for present and future airplane and space vehicle applications. Also, present wiring installation techniques and hardware are analyzed to establish existing problem areas. An advanced wiring system employing matrix interconnecting unit, plug to plug trunk bundles (FCC or ribbon cable) is outlined, and an installation study presented. A planned program to develop, lab test and flight test key features of these techniques and hardware as a part of the SST technology follow-on activities is discussed.

  17. A comprehensive scoring system to measure healthy community design in land use plans and regulations.

    PubMed

    Maiden, Kristin M; Kaplan, Marina; Walling, Lee Ann; Miller, Patricia P; Crist, Gina

    2017-02-01

    Comprehensive land use plans and their corresponding regulations play a role in determining the nature of the built environment and community design, which are factors that influence population health and health disparities. To determine the level in which a plan addresses healthy living and active design, there is a need for a systematic, reliable and valid method of analyzing and scoring health-related content in plans and regulations. This paper describes the development and validation of a scoring tool designed to measure the strength and comprehensiveness of health-related content found in land use plans and the corresponding regulations. The measures are scored based on the presence of a specific item and the specificity and action-orientation of language. To establish reliability and validity, 42 land use plans and regulations from across the United States were scored January-April 2016. Results of the psychometric analysis indicate the scorecard is a reliable scoring tool for land use plans and regulations related to healthy living and active design. Intraclass correlation coefficients (ICC) scores showed strong inter-rater reliability for total strength and comprehensiveness. ICC scores for total implementation scores showed acceptable consistency among scorers. Cronbach's alpha values for all focus areas were acceptable. Strong content validity was measured through a committee vetting process. The development of this tool has far-reaching implications, bringing standardization of measurement to the field of land use plan assessment, and paving the way for systematic inclusion of health-related design principles, policies, and requirements in land use plans and their corresponding regulations. Copyright © 2016 Elsevier Inc. All rights reserved.

  18. A systematic review of evaluated suicide prevention programs targeting indigenous youth.

    PubMed

    Harlow, Alyssa F; Bohanna, India; Clough, Alan

    2014-01-01

    Indigenous young people have significantly higher suicide rates than their non-indigenous counterparts. There is a need for culturally appropriate and effective suicide prevention programs for this demographic. This review assesses suicide prevention programs that have been evaluated for indigenous youth in Australia, Canada, New Zealand, and the United States. The databases MEDLINE and PsycINFO were searched for publications on suicide prevention programs targeting indigenous youth that include reports on evaluations and outcomes. Program content, indigenous involvement, evaluation design, program implementation, and outcomes were assessed for each article. The search yielded 229 articles; 90 abstracts were assessed, and 11 articles describing nine programs were reviewed. Two Australian programs and seven American programs were included. Programs were culturally tailored, flexible, and incorporated multiple-levels of prevention. No randomized controlled trials were found, and many programs employed ad hoc evaluations, poor program description, and no process evaluation. Despite culturally appropriate content, the results of the review indicate that more controlled study designs using planned evaluations and valid outcome measures are needed in research on indigenous youth suicide prevention. Such changes may positively influence the future of research on indigenous youth suicide prevention as the outcomes and efficacy will be more reliable.

  19. Power transfer systems for future navy helicopters. Final report 25 Jun 70--28 Jun 72

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bossler, R.B. Jr.

    1972-11-01

    The purpose of this program was to conduct an analysis of helicopter power transfer systems (pts), both conventional and advanced concept type, with the objective of reducing specific weights and improving reliability beyond present values. The analysis satisfied requirements specified for a 200,000 pound cargo transport helicopter (CTH), a 70,000 pound heavy assault helicopter, and a 15,000 pound non-combat search and rescue helicopter. Four selected gearing systems (out of seven studied), optimized for lightest weight and equal reliability for the CTH, using component proportioning via stress and stiffness equations, had no significant difference between their aircraft payloads. All optimized ptsmore » were approximately 70% of statistically predicted weight. Reliability increase is predicted via gearbox derating using Weibull relationships. Among advanced concepts, the Turbine Integrated Geared Rotor was competitive for weight, technology availability and reliability increase but handicapped by a special engine requirement. The warm cycle system was found not competitive. Helicopter parametric weight analysis is shown. Advanced development Plans are presented for the pts for the CTH, including total pts system, selected pts components, and scale model flight testing in a Kaman HH2 helicopter.« less

  20. National Space Transportation System (NSTS) technology needs

    NASA Technical Reports Server (NTRS)

    Winterhalter, David L.; Ulrich, Kimberly K.

    1990-01-01

    The National Space Transportation System (NSTS) is one of the Nation's most valuable resources, providing manned transportation to and from space in support of payloads and scientific research. The NSTS program is currently faced with the problem of hardware obsolescence, which could result in unacceptable schedule and cost impacts to the flight program. Obsolescence problems occur because certain components are no longer being manufactured or repair turnaround time is excessive. In order to achieve a long-term, reliable transportation system that can support manned access to space through 2010 and beyond, NASA must develop a strategic plan for a phased implementation of enhancements which will satisfy this long-term goal. The NSTS program has initiated the Assured Shuttle Availability (ASA) project with the following objectives: eliminate hardware obsolescence in critical areas, increase reliability and safety of the vehicle, decrease operational costs and turnaround time, and improve operational capability. The strategy for ASA will be to first meet the mandatory needs - keep the Shuttle flying. Non-mandatory changes that will improve operational capability and enhance performance will then be considered if funding is adequate. Upgrade packages should be developed to install within designated inspection periods, grouped in a systematic approach to reduce cost and schedule impacts, and allow the capability to provide a Block 2 Shuttle (Phase 3).

  1. 78 FR 49595 - Aviation Rulemaking Advisory Committee-New Task

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-14

    ... the new ARAC activity and solicits membership for the Maintenance Reliability Program Working Group... establish the Maintenance Reliability Program Working Group. The working group will serve as staff to ARAC... programs. The Maintenance Reliability Program Working Group will provide advice and recommendations on the...

  2. Transit Reliability Information Program Participants Guidelines

    DOT National Transportation Integrated Search

    1981-03-01

    The document provides guidelines for participation in the Transit Reliability Information Program (TRIP). TRIP is a government-initiated program designed to assist the transit industry in satisfying its need for transit equipment reliability data. TR...

  3. Ceramic Technology Project semiannual progress report, April 1992--September 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, D.R.

    1993-07-01

    This project was developed to meet the ceramic technology requirements of the DOE Office of Transportation Systems` automotive technology programs. Significant progress in fabricating ceramic components for DOE, NASA, and DOE advanced heat engine programs show that operation of ceramic parts in high-temperature engines is feasible; however, addition research is needed in materials and processing, design, and data base and life prediction before industry will have a sufficient technology base for producing reliable cost-effective ceramic engine components commercially. A 5-yr project plan was developed, with focus on structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments,more » and ceramic coatings for thermal barrier and wear applications in these engines.« less

  4. The NASA-Lewis/ERDA Solar Heating and Cooling Technology Program

    NASA Technical Reports Server (NTRS)

    Couch, J. P.; Bloomfield, H. S.

    1975-01-01

    The NASA Lewis Research Center plans to carry out a major role in the ERDA Solar Heating and Cooling Program. This role would be to create and test the enabling technology for future solar heating, cooling, and combined heating/cooling systems. The major objectives of the project are to achieve reduction in solar energy system costs, while maintaining adequate performance, reliability, life, and maintenance characteristics. The project approach is to move progressively through component, subsystem, and then system technology advancement phases in parallel with continuing manufacturing cost assessment studies. This approach will be accomplished principally by contract with industry to develop advanced components and subsystems. This advanced hardware will be tested to establish 'technology readiness' both under controlled laboratory conditions and under real sun conditions.

  5. Educating Young People about Environmental Health for Informed Social Action.

    PubMed

    Keselman, Alla; Levin, Daniel M; Kramer, Judy F; Matzkin, Karen; Dutcher, Gale

    2011-01-01

    Whereas environmental health education is rapidly becoming a global priority, it still receives little attention in schools. This paper describes a U.S. National Library of Medicine program, aiming to support environmental health education in grades 6-12 in U.S. schools. The program has four components: (1) developing reliable online resources that provide quality environmental health information; (2) creating lesson plans that integrate our resources into the classroom and extracurricular activities; (3) engaging teachers by inviting collaborations and promoting our resources and activities; and (4) conducting educational research that provides a foundation for the other components. The paper describes specific educational resources and activities and grounds them in learning theories from the fields of cognitive psychology and science education.

  6. Toward an explicit analysis of generalization: A stimulus control interpretation

    PubMed Central

    Kirby, Kimberly C.; Bickel, Warren K.

    1988-01-01

    Producing generality of treatment effects to new settings has been a critical concern for applied behavior analysts, but a systematic and reliable means of producing generality has yet to be provided. We argue that the principles of stimulus control and reinforcement underlie the production of most generalized effects; therefore, we suggest interpreting generalization programming in terms of stimulus control. The generalization programming procedures identified by Stokes and Baer (1977) are discussed in terms of both the stimulus control tactics explicitly identified and those that may be operating but are not explicitly identified. Our interpretation clarifies the critical components of Stokes and Baer's procedures and places greater emphasis on planning for generalization as a part of training procedures. PMID:22478006

  7. Educating Young People about Environmental Health for Informed Social Action

    PubMed Central

    Keselman, Alla; Levin, Daniel M.; Kramer, Judy F.; Matzkin, Karen; Dutcher, Gale

    2013-01-01

    Whereas environmental health education is rapidly becoming a global priority, it still receives little attention in schools. This paper describes a U.S. National Library of Medicine program, aiming to support environmental health education in grades 6-12 in U.S. schools. The program has four components: (1) developing reliable online resources that provide quality environmental health information; (2) creating lesson plans that integrate our resources into the classroom and extracurricular activities; (3) engaging teachers by inviting collaborations and promoting our resources and activities; and (4) conducting educational research that provides a foundation for the other components. The paper describes specific educational resources and activities and grounds them in learning theories from the fields of cognitive psychology and science education. PMID:24383062

  8. Features and characterization needs of rubber composite structures

    NASA Technical Reports Server (NTRS)

    Tabaddor, Farhad

    1989-01-01

    Some of the major unique features of rubber composite structures are outlined. The features covered are those related to the material properties, but the analytical features are also briefly discussed. It is essential to recognize these features at the planning stage of any long-range analytical, experimental, or application program. The development of a general and comprehensive program which fully accounts for all the important characteristics of tires, under all the relevant modes of operation, may present a prohibitively expensive and impractical task at the near future. There is therefore a need to develop application methodologies which can utilize the less general models, beyond their theoretical limitations and yet with reasonable reliability, by proper mix of analytical, experimental, and testing activities.

  9. Simulation-based Assessment to Reliably Identify Key Resident Performance Attributes.

    PubMed

    Blum, Richard H; Muret-Wagstaff, Sharon L; Boulet, John R; Cooper, Jeffrey B; Petrusa, Emil R; Baker, Keith H; Davidyuk, Galina; Dearden, Jennifer L; Feinstein, David M; Jones, Stephanie B; Kimball, William R; Mitchell, John D; Nadelberg, Robert L; Wiser, Sarah H; Albrecht, Meredith A; Anastasi, Amanda K; Bose, Ruma R; Chang, Laura Y; Culley, Deborah J; Fisher, Lauren J; Grover, Meera; Klainer, Suzanne B; Kveraga, Rikante; Martel, Jeffrey P; McKenna, Shannon S; Minehart, Rebecca D; Mitchell, John D; Mountjoy, Jeremi R; Pawlowski, John B; Pilon, Robert N; Shook, Douglas C; Silver, David A; Warfield, Carol A; Zaleski, Katherine L

    2018-04-01

    Obtaining reliable and valid information on resident performance is critical to patient safety and training program improvement. The goals were to characterize important anesthesia resident performance gaps that are not typically evaluated, and to further validate scores from a multiscenario simulation-based assessment. Seven high-fidelity scenarios reflecting core anesthesiology skills were administered to 51 first-year residents (CA-1s) and 16 third-year residents (CA-3s) from three residency programs. Twenty trained attending anesthesiologists rated resident performances using a seven-point behaviorally anchored rating scale for five domains: (1) formulate a clear plan, (2) modify the plan under changing conditions, (3) communicate effectively, (4) identify performance improvement opportunities, and (5) recognize limits. A second rater assessed 10% of encounters. Scores and variances for each domain, each scenario, and the total were compared. Low domain ratings (1, 2) were examined in detail. Interrater agreement was 0.76; reliability of the seven-scenario assessment was r = 0.70. CA-3s had a significantly higher average total score (4.9 ± 1.1 vs. 4.6 ± 1.1, P = 0.01, effect size = 0.33). CA-3s significantly outscored CA-1s for five of seven scenarios and domains 1, 2, and 3. CA-1s had a significantly higher proportion of worrisome ratings than CA-3s (chi-square = 24.1, P < 0.01, effect size = 1.50). Ninety-eight percent of residents rated the simulations more educational than an average day in the operating room. Sensitivity of the assessment to CA-1 versus CA-3 performance differences for most scenarios and domains supports validity. No differences, by experience level, were detected for two domains associated with reflective practice. Smaller score variances for CA-3s likely reflect a training effect; however, worrisome performance scores for both CA-1s and CA-3s suggest room for improvement.

  10. Development and preliminary testing of a self-rating instrument to measure self-directed learning ability of nursing students.

    PubMed

    Cheng, Su-Fen; Kuo, Chien-Lin; Lin, Kuan-Chia; Lee-Hsieh, Jane

    2010-09-01

    With the growing trend of preparing students for lifelong learning, the theory of self-directed learning (SDL) has been increasingly applied in the context of higher education. In order to foster lifelong learning, abilities among nursing students, faculties need to have an appropriate instrument to measure the SDL abilities of nursing students. The objectives of this study were to develop an instrument to measure the SDL abilities of nursing students and to test the validity and reliability of this instrument. This study was conducted in 4 phases. In Phase 1, based on a review of the literature, the researchers developed an instrument to measure SDL. In Phase 2, two rounds of the Delphi study were conducted, to determine the content validity of the instrument. In Phase 3, a convenience sample of 1072 nursing students from two representative schools across three different types of nursing programs were recruited to test the construct validity of the Self-Directed Learning Instrument (SDLI). Finally, in Phase 4, the internal consistency and reliability of the instrument were tested. The resulting SDLI consists of 20 items across the following four domains: learning motivation, planning and implementing, self-monitoring, and interpersonal, communication. The final model in confirmatory factor analysis revealed that this 20-item SDLI indicated a good fit of the model. The value of Cronbach's alpha for the total scale was .916 and for the four domains were .801, .861, .785, and .765, respectively. The SDLI is a valid and reliable instrument for identifying student SDL abilities. It is available to students in nursing and similar medical programs to evaluate their own SDL. This scale may also enable nursing faculty to assess students' SDL status, design better lesson plans and curricula, and, implement appropriate teaching strategies for nursing students in order to foster the growth of lifelong learning abilities. Copyright (c) 2010 Elsevier Ltd. All rights reserved.

  11. Developing an Acceptability Assessment of Preventive Dental Treatments

    PubMed Central

    Hyde, Susan; Gansky, Stuart A.; Gonzalez-Vargas, Maria J.; Husting, Sheila R.; Cheng, Nancy F.; Millstein, Susan G.; Adams, Sally H.

    2012-01-01

    Objectives Early childhood caries (ECC) is very prevalent among young Hispanic children. ECC is amenable to a variety of preventive procedures, yet many Hispanic families underutilize dental services. Acceptability research may assist in health care planning and resource allocation by identifying patient preferences among efficacious treatments with the goal of improving their utilization. The purposes of this study were (a) to develop a culturally competent acceptability assessment instrument, directed toward the caregivers of young Hispanic children, for five preventive dental treatments for ECC and (b) to test the instrument's reliability and validity. Methods An instrument of five standard treatments known to prevent ECC was developed, translated, reviewed by focus groups, and pilot tested, then tested for reliability. The instrument included illustrated cards, brief video clips, and samples of the treatments and was culturally appropriate for low-income Hispanic caregivers. In addition to determining the acceptability of the five treatments individually, the treatments were also presented as paired comparisons. Results Focus groups and debriefing interviews following the pilot tests established that the instrument has good face validity. The illustrated cards, product samples, and video demonstrations of the five treatments resulted in an instrument possessing good content validity. The instrument has good to excellent test–retest reliability, with identical time 1–time 2 responses for each of the five treatments 92 percent of the time (range 87 to 97 percent), and the same treatment of the paired comparisons preferred 75 percent of the time (range 61 to 90 percent). Conclusions The acceptability instrument described is reliable and valid and may be useful in program planning efforts to identify and increase the utilization of preferred ECC preventive treatments for target populations. PMID:18662256

  12. Developing an acceptability assessment of preventive dental treatments.

    PubMed

    Hyde, Susan; Gansky, Stuart A; Gonzalez-Vargas, Maria J; Husting, Sheila R; Cheng, Nancy F; Millstein, Susan G; Adams, Sally H

    2009-01-01

    Early childhood caries (ECC) is very prevalent among young Hispanic children. ECC is amenable to a variety of preventive procedures, yet many Hispanic families underutilize dental services. Acceptability research may assist in health care planning and resource allocation by identifying patient preferences among efficacious treatments with the goal of improving their utilization. The purposes of this study were (a) to develop a culturally competent acceptability assessment instrument, directed toward the caregivers of young Hispanic children, for five preventive dental treatments for ECC and (b) to test the instrument's reliability and validity. An instrument of five standard treatments known to prevent ECC was developed, translated, reviewed by focus groups, and pilot tested, then tested for reliability The instrument included illustrated cards, brief video clips, and samples of the treatments and was culturally appropriate for low-income Hispanic caregivers. In addition to determining the acceptability of the five treatments individually, the treatments were also presented as paired comparisons. Focus groups and debriefing interviews following the pilot tests established that the instrument has good face validity. The illustrated cards, product samples, and video demonstrations of the five treatments resulted in an instrument possessing good content validity. The instrument has good to excellent test-retest reliability, with identical time 1-time 2 responses for each of the five treatments 92 percent of the time (range 87 to 97 percent), and the same treatment of the paired comparisons preferred 75 percent of the time (range 61 to 90 percent). The acceptability instrument described is reliable and valid and may be useful in program planning efforts to identify and increase the utilization of preferred ECC preventive treatments for target populations.

  13. Status of the NASA Balloon Program

    NASA Astrophysics Data System (ADS)

    Needleman, H. C.; Nock, R. S.; Bawcom, D. W.

    1993-02-01

    In the early 1980's the U.S. National Aeronautics and Space Administration (NASA) Balloon Program was faced with a problem of catastrophic balloon failures. In 1986 a balloon recovery program was initiated. This program included qualification of new balloon films, and investigations into materials, processing, structures and performance of balloons. This recovery program has been very successful. To date, more than 100 balloons manufactured of newly developed films have been flown with unprecedented success. There has been much progress made across the spectrum of balloon related disciplines. A new design philosophy has been developed and is being used for all NASA balloons. An updated balloon reliability and quality assurance program is in effect. The long duration balloon development project has been initiated with the first flight test having been conducted in December 1989 from Antarctica. A comprehensive research and development (R&D) effort has been initiated and is progressing well. The progress, status and future plans for these and other aspects of the NASA program, along with a description of the comprehensive balloon R&D activity, will be presented.

  14. Transit Reliability Information Program (TRIP) : Final Technical Report

    DOT National Transportation Integrated Search

    1984-05-01

    The Transit Reliability Information Program (TRIP) is a government-initiated program to assist the transit industry in satisfying its need for rail transit car subsystem reliability information. TRIP provided this assistance through the operation of ...

  15. Transit Reliability Information Program (TRIP) Phase I Report

    DOT National Transportation Integrated Search

    1981-06-01

    The Transit Reliability Information Program (TRIP) is a government initiated program to assist the transit industry in satisfying its need for transit reliability information. TRIP provides this assistance through the operation of a national reliabil...

  16. HiRel: Hybrid Automated Reliability Predictor (HARP) integrated reliability tool system, (version 7.0). Volume 1: HARP introduction and user's guide

    NASA Technical Reports Server (NTRS)

    Bavuso, Salvatore J.; Rothmann, Elizabeth; Dugan, Joanne Bechta; Trivedi, Kishor S.; Mittal, Nitin; Boyd, Mark A.; Geist, Robert M.; Smotherman, Mark D.

    1994-01-01

    The Hybrid Automated Reliability Predictor (HARP) integrated Reliability (HiRel) tool system for reliability/availability prediction offers a toolbox of integrated reliability/availability programs that can be used to customize the user's application in a workstation or nonworkstation environment. HiRel consists of interactive graphical input/output programs and four reliability/availability modeling engines that provide analytical and simulative solutions to a wide host of reliable fault-tolerant system architectures and is also applicable to electronic systems in general. The tool system was designed to be compatible with most computing platforms and operating systems, and some programs have been beta tested, within the aerospace community for over 8 years. Volume 1 provides an introduction to the HARP program. Comprehensive information on HARP mathematical models can be found in the references.

  17. Evaluation of Informed Choice for contraceptive methods among women attending a family planning program: conceptual development; a case study in Chile.

    PubMed

    Valdés, Patricio R; Alarcon, Ana M; Munoz, Sergio R

    2013-03-01

    To generate and validate a scale to measure the Informed Choice of contraceptive methods among women attending a family health care service in Chile. The study follows a multimethod design that combined expert opinions from 13 physicians, 3 focus groups of 21 women each, and a sample survey of 1,446 women. Data analysis consisted of a qualitative text analysis of group interviews, a factor analysis for construct validity, and kappa statistic and Cronbach alpha to assess scale reliability. The instrument comprises 25 items grouped into six categories: information and orientation, quality of treatment, communication, participation in decision making, expression of reproductive rights, and method access and availability. Internal consistency measured with Cronbach alpha ranged from 0.75 to 0.89 for all subscales (kappa, 0.62; standard deviation, 0.06), and construct validity was demonstrated from the testing of several hypotheses. The use of mixed methods contributed to developing a scale of Informed Choice that was culturally appropriate for assessing the women who participated in the family planning program. Copyright © 2013 Elsevier Inc. All rights reserved.

  18. 77 FR 26686 - Transmission Planning Reliability Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ... Normal (No Contingency) Conditions (Category A), TPL-002-1b--System Performance Following Loss of a... Reliability Standard should not allow an entity to plan for the loss of non-consequential firm load in the... approval of its proposal to revise and clarify footnote `b' ``in regard to load loss following a single...

  19. Hopi Sustainable Energy Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Norman Honie, Jr.; Margie Schaff; Mark Hannifan

    2004-08-01

    The Hopi Tribal Government as part of an initiative to ?Regulate the delivery of energy and energy services to the Hopi Reservation and to create a strategic business plan for tribal provision of appropriate utility, both in a manner that improves the reliability and cost efficiency of such services,? established the Hopi Clean Air Partnership Project (HCAPP) to support the Tribe?s economic development goals, which is sensitive to the needs and ways of the Hopi people. The Department of Energy (DOE) funded, Formation of Hopi Sustainable Energy Program results are included in the Clean Air Partnership Report. One of themore » Hopi Tribe?s primary strategies to improving the reliability and cost efficiency of energy services on the Reservation and to creating alternative (to coal) economic development opportunities is to form and begin implementation of the Hopi Sustainable Energy Program. The Hopi Tribe through the implementation of this grant identified various economic opportunities available from renewable energy resources. However, in order to take advantage of those opportunities, capacity building of tribal staff is essential in order for the Tribe to develop and manage its renewable energy resources. As Arizona public utilities such as APS?s renewable energy portfolio increases the demand for renewable power will increase. The Hopi Tribe would be in a good position to provide a percentage of the power through wind energy. It is equally important that the Hopi Tribe begin a dialogue with APS and NTUA to purchase the 69Kv transmission on Hopi and begin looking into financing options to purchase the line.« less

  20. Vibroacoustic test plan evaluation: Parameter variation study

    NASA Technical Reports Server (NTRS)

    Stahle, C. V.; Gongloef, H. R.

    1976-01-01

    Statistical decision models are shown to provide a viable method of evaluating the cost effectiveness of alternate vibroacoustic test plans and the associated test levels. The methodology developed provides a major step toward the development of a realistic tool to quantitatively tailor test programs to specific payloads. Testing is considered at the no test, component, subassembly, or system level of assembly. Component redundancy and partial loss of flight data are considered. Most and probabilistic costs are considered, and incipient failures resulting from ground tests are treated. Optimums defining both component and assembly test levels are indicated for the modified test plans considered. modeling simplifications must be considered in interpreting the results relative to a particular payload. New parameters introduced were a no test option, flight by flight failure probabilities, and a cost to design components for higher vibration requirements. Parameters varied were the shuttle payload bay internal acoustic environment, the STS launch cost, the component retest/repair cost, and the amount of redundancy in the housekeeping section of the payload reliability model.

  1. Towards cost-effective reliability through visualization of the reliability option space

    NASA Technical Reports Server (NTRS)

    Feather, Martin S.

    2004-01-01

    In planning a complex system's development there can be many options to improve its reliability. Typically their sum total cost exceeds the budget available, so it is necessary to select judiciously from among them. Reliability models can be employed to calculate the cost and reliability implications of a candidate selection.

  2. Nuclear safety policy working group recommendations on nuclear propulsion safety for the space exploration initiative

    NASA Technical Reports Server (NTRS)

    Marshall, Albert C.; Lee, James H.; Mcculloch, William H.; Sawyer, J. Charles, Jr.; Bari, Robert A.; Cullingford, Hatice S.; Hardy, Alva C.; Niederauer, George F.; Remp, Kerry; Rice, John W.

    1993-01-01

    An interagency Nuclear Safety Working Group (NSPWG) was chartered to recommend nuclear safety policy, requirements, and guidelines for the Space Exploration Initiative (SEI) nuclear propulsion program. These recommendations, which are contained in this report, should facilitate the implementation of mission planning and conceptual design studies. The NSPWG has recommended a top-level policy to provide the guiding principles for the development and implementation of the SEI nuclear propulsion safety program. In addition, the NSPWG has reviewed safety issues for nuclear propulsion and recommended top-level safety requirements and guidelines to address these issues. These recommendations should be useful for the development of the program's top-level requirements for safety functions (referred to as Safety Functional Requirements). The safety requirements and guidelines address the following topics: reactor start-up, inadvertent criticality, radiological release and exposure, disposal, entry, safeguards, risk/reliability, operational safety, ground testing, and other considerations.

  3. Development and Testing of a High Stability Engine Control (HISTEC) System

    NASA Technical Reports Server (NTRS)

    Orme, John S.; DeLaat, John C.; Southwick, Robert D.; Gallops, George W.; Doane, Paul M.

    1998-01-01

    Flight tests were recently completed to demonstrate an inlet-distortion-tolerant engine control system. These flight tests were part of NASA's High Stability Engine Control (HISTEC) program. The objective of the HISTEC program was to design, develop, and flight demonstrate an advanced integrated engine control system that uses measurement-based, real-time estimates of inlet airflow distortion to enhance engine stability. With improved stability and tolerance of inlet airflow distortion, future engine designs may benefit from a reduction in design stall-margin requirements and enhanced reliability, with a corresponding increase in performance and decrease in fuel consumption. This paper describes the HISTEC methodology, presents an aircraft test bed description (including HISTEC-specific modifications) and verification and validation ground tests. Additionally, flight test safety considerations, test plan and technique design and approach, and flight operations are addressed. Some illustrative results are presented to demonstrate the type of analysis and results produced from the flight test program.

  4. Management of the aging of critical safety-related concrete structures in light-water reactor plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Naus, D.J.; Oland, C.B.; Arndt, E.G.

    1990-01-01

    The Structural Aging Program has the overall objective of providing the USNRC with an improved basis for evaluating nuclear power plant safety-related structures for continued service. The program consists of a management task and three technical tasks: materials property data base, structural component assessment/repair technology, and quantitative methodology for continued-service determinations. Objectives, accomplishments, and planned activities under each of these tasks are presented. Major program accomplishments include development of a materials property data base for structural materials as well as an aging assessment methodology for concrete structures in nuclear power plants. Furthermore, a review and assessment of inservice inspection techniquesmore » for concrete materials and structures has been complete, and work on development of a methodology which can be used for performing current as well as reliability-based future condition assessment of concrete structures is well under way. 43 refs., 3 tabs.« less

  5. Implementing a resource management program for accreditation process at the medical laboratory.

    PubMed

    Yenice, Sedef

    2009-03-01

    To plan for and provide adequate resources to meet the mission and goals of a medical laboratory in compliance with the requirements for laboratory accreditation by Joint Commission International. The related policies and procedures were developed based on standard requirements for resource management. Competency assessment provided continuing education and performance feedback to laboratory employees. Laboratory areas were designed for the efficient and safe performance of laboratory work. A physical environment was built up where hazards were controlled and personnel activities were managed to reduce the risk of injuries. An Employees Occupational Safety and Health Program (EOSHP) was developed to address all types of hazardous materials and wastes. Guidelines were defined to verify that the methods would produce accurate and reliable results. An active resource management program will be an effective way of assuring that systems are in control and continuous improvement is in progress.

  6. Software reliability experiments data analysis and investigation

    NASA Technical Reports Server (NTRS)

    Walker, J. Leslie; Caglayan, Alper K.

    1991-01-01

    The objectives are to investigate the fundamental reasons which cause independently developed software programs to fail dependently, and to examine fault tolerant software structures which maximize reliability gain in the presence of such dependent failure behavior. The authors used 20 redundant programs from a software reliability experiment to analyze the software errors causing coincident failures, to compare the reliability of N-version and recovery block structures composed of these programs, and to examine the impact of diversity on software reliability using subpopulations of these programs. The results indicate that both conceptually related and unrelated errors can cause coincident failures and that recovery block structures offer more reliability gain than N-version structures if acceptance checks that fail independently from the software components are available. The authors present a theory of general program checkers that have potential application for acceptance tests.

  7. [Training needs for health and nutrition personnel in developing nations].

    PubMed

    Delgado, H L; Valverde, V; Angel, L O

    1983-01-01

    This paper examines some of the factors related to the training of health and nutrition personnel in developing countries in general and in Latin America in particular. It addresses both professional and technical level staff responsible for the formulation of plans and programs, and auxiliary personnel responsible for the delivery of services. Using the systems analysis model, the need for training human resources in research techniques and decision-making on a scientific basis is taken as an example for a discussion of aspects of the diagnosis, planning, execution and evaluation of health and nutrition programs. Various ways are indicated of giving training in research techniques, using the personnel available and employing simple instructions and methods, currently under-used, such as gathering anthropometric data. The authors stress that if an effort were to be made in the countries, the risk factors influencing health and nutrition, particularly among the maternal-child group, might well be identified quickly and without great cost. The case of the height census in Costa Rica is reviewed as a practical example of programs that have originated in developing countries and that make maximum use of auxiliary personnel in obtaining reliable, valid information for decision-making purposes. This census included children in the first grade of the primary cycle at the national level. The contents of the tutorial training program of the Institute of Nutrition of Central America and Panama (INCAP) are also described.

  8. Leveraging community support for Education and Outreach: The IRIS E&O Program

    NASA Astrophysics Data System (ADS)

    Taber, J.; Hubenthal, M.; Wysession, M. E.

    2009-12-01

    The IRIS E&O Program was initiated 10 years ago, some 15 years after the creation of the IRIS Consortium, as IRIS members increasingly recognized the fundamental need to communicate the results of scientific research more effectively and to attract more students to study Earth science. Since then, IRIS E&O has received core funding through successive 5-year cooperative agreements with NSF, based on proposals submitted by IRIS. While a small fraction of the overall Consortium budget, this consistent funding has allowed the development of strong, long-term elements within the E&O Program, including summer internships, IRIS/USGS museum displays, seismographs in schools, IRIS/SSA Distinguished Lecture series, and professional development for middle school and high school teachers. Reliable funding has allowed us to develop expertise in these areas due to the longevity of the programs and the continuous improvement resulting from ongoing evaluations. Support from Consortium members, including volunteering time and expertise, has been critical for the program, as the Consortium has to continually balance the value of E&O products versus equipment and data services for seismology research. The E&O program also provides service to the Consortium, such as PIs being able to count on and leverage IRIS resources when defining the broader impacts of their own research. The reliable base has made it possible to build on the core elements with focused and innovative proposals, allowing, for example, the expansion of our internship program into a full REU site. Developing collaborative proposals with other groups has been a key strategy where IRIS E&O's long-term viability can be combined with expertise from other organizations to develop new products and services. IRIS can offer to continue to reliably deliver and maintain products after the end of a 2-3 year funding cycle, which can greatly increase the reach of the project. Consortium backing has also allowed us to establish an educational fund in honor of the late John Lahr. This fund, which is comprised of individual donations, is being used to provide seismographs to schools along with professional development and ongoing support from the E&O program. We are also developing a plan for attracting larger private and/or foundation funds for new E&O activities, leveraging the reputation of a long-term program.

  9. HiRel: Hybrid Automated Reliability Predictor (HARP) integrated reliability tool system, (version 7.0). Volume 4: HARP Output (HARPO) graphics display user's guide

    NASA Technical Reports Server (NTRS)

    Sproles, Darrell W.; Bavuso, Salvatore J.

    1994-01-01

    The Hybrid Automated Reliability Predictor (HARP) integrated Reliability (HiRel) tool system for reliability/availability prediction offers a toolbox of integrated reliability/availability programs that can be used to customize the user's application in a workstation or nonworkstation environment. HiRel consists of interactive graphical input/output programs and four reliability/availability modeling engines that provide analytical and simulative solutions to a wide host of highly reliable fault-tolerant system architectures and is also applicable to electronic systems in general. The tool system was designed at the outset to be compatible with most computing platforms and operating systems and some programs have been beta tested within the aerospace community for over 8 years. This document is a user's guide for the HiRel graphical postprocessor program HARPO (HARP Output). HARPO reads ASCII files generated by HARP. It provides an interactive plotting capability that can be used to display alternate model data for trade-off analyses. File data can also be imported to other commercial software programs.

  10. Commercialization of NESSUS: Status

    NASA Technical Reports Server (NTRS)

    Thacker, Ben H.; Millwater, Harry R.

    1991-01-01

    A plan was initiated in 1988 to commercialize the Numerical Evaluation of Stochastic Structures Under Stress (NESSUS) probabilistic structural analysis software. The goal of the on-going commercialization effort is to begin the transfer of Probabilistic Structural Analysis Method (PSAM) developed technology into industry and to develop additional funding resources in the general area of structural reliability. The commercialization effort is summarized. The SwRI NESSUS Software System is a general purpose probabilistic finite element computer program using state of the art methods for predicting stochastic structural response due to random loads, material properties, part geometry, and boundary conditions. NESSUS can be used to assess structural reliability, to compute probability of failure, to rank the input random variables by importance, and to provide a more cost effective design than traditional methods. The goal is to develop a general probabilistic structural analysis methodology to assist in the certification of critical components in the next generation Space Shuttle Main Engine.

  11. Examining the nexus between domestic violence and animal abuse in a national sample of service providers.

    PubMed

    Krienert, Jessie L; Walsh, Jeffrey A; Matthews, Kevin; McConkey, Kelly

    2012-01-01

    Companion animals play a complex role in families impacted by violence. An outlet of emotional support for victims, the family pet often becomes a target for physical abuse. Results from a comprehensive e-survey of domestic violence shelters nationwide (N = 767) highlight both improvements and existing gaps in service provision for domestic violence victims and their pets. Quantitative and qualitative data noted frequently encountered obstacles to successful shelter seeking by abuse victims with companion animals including a lack of availability, funding, space, and reliable programming. Although results indicate an overall improvement in organizational awareness, fewer than half of surveyed shelters include intake questions about animals. Continued awareness and an expansion of services is needed to create viable safety planning strategies and reliable alternatives for women with companion animals in order to improve the likelihood that abuse victims will seek escape and refuge for themselves, their children, and their pets.

  12. Earthquake forecasting during the complex Amatrice-Norcia seismic sequence

    PubMed Central

    Marzocchi, Warner; Taroni, Matteo; Falcone, Giuseppe

    2017-01-01

    Earthquake forecasting is the ultimate challenge for seismologists, because it condenses the scientific knowledge about the earthquake occurrence process, and it is an essential component of any sound risk mitigation planning. It is commonly assumed that, in the short term, trustworthy earthquake forecasts are possible only for typical aftershock sequences, where the largest shock is followed by many smaller earthquakes that decay with time according to the Omori power law. We show that the current Italian operational earthquake forecasting system issued statistically reliable and skillful space-time-magnitude forecasts of the largest earthquakes during the complex 2016–2017 Amatrice-Norcia sequence, which is characterized by several bursts of seismicity and a significant deviation from the Omori law. This capability to deliver statistically reliable forecasts is an essential component of any program to assist public decision-makers and citizens in the challenging risk management of complex seismic sequences. PMID:28924610

  13. Earthquake forecasting during the complex Amatrice-Norcia seismic sequence.

    PubMed

    Marzocchi, Warner; Taroni, Matteo; Falcone, Giuseppe

    2017-09-01

    Earthquake forecasting is the ultimate challenge for seismologists, because it condenses the scientific knowledge about the earthquake occurrence process, and it is an essential component of any sound risk mitigation planning. It is commonly assumed that, in the short term, trustworthy earthquake forecasts are possible only for typical aftershock sequences, where the largest shock is followed by many smaller earthquakes that decay with time according to the Omori power law. We show that the current Italian operational earthquake forecasting system issued statistically reliable and skillful space-time-magnitude forecasts of the largest earthquakes during the complex 2016-2017 Amatrice-Norcia sequence, which is characterized by several bursts of seismicity and a significant deviation from the Omori law. This capability to deliver statistically reliable forecasts is an essential component of any program to assist public decision-makers and citizens in the challenging risk management of complex seismic sequences.

  14. Ares V: Progress Towards a Heavy Lift Capability for the Moon and Beyond

    NASA Technical Reports Server (NTRS)

    Creech, Steve

    2008-01-01

    NASA's new exploration initiative will again take humans beyond low Earth orbit, to the moon, and into deep space. The space agency is developing a new fleet of launch vehicles that will fulfill the national goals of replacing the Space Shuttle fleet, completing the International Space Station, establishing a permanent outpost on the moon, and eventually traveling to Mars. Separate crew and cargo vehicles emerged from mission architecture studies - the Ares I to carry the Orion crew exploration vehicle and its crew of4 to 6 astronauts, and the Ares V to carry the Altair lunar lander or other supplies to support future exploration missions. (Figure 1) These vehicles will be designed to be safe, affordable, sustainable, reliable, operable with the safety, reliability, flexibility, and operability to serve this nation's manned and unmanned exploration programs for the coming decades. This paper discusses recent and current progress on the Ares V and planned future activities.

  15. Minimizing treatment planning errors in proton therapy using failure mode and effects analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zheng, Yuanshui, E-mail: yuanshui.zheng@okc.procure.com; Johnson, Randall; Larson, Gary

    Purpose: Failure mode and effects analysis (FMEA) is a widely used tool to evaluate safety or reliability in conventional photon radiation therapy. However, reports about FMEA application in proton therapy are scarce. The purpose of this study is to apply FMEA in safety improvement of proton treatment planning at their center. Methods: The authors performed an FMEA analysis of their proton therapy treatment planning process using uniform scanning proton beams. The authors identified possible failure modes in various planning processes, including image fusion, contouring, beam arrangement, dose calculation, plan export, documents, billing, and so on. For each error, the authorsmore » estimated the frequency of occurrence, the likelihood of being undetected, and the severity of the error if it went undetected and calculated the risk priority number (RPN). The FMEA results were used to design their quality management program. In addition, the authors created a database to track the identified dosimetric errors. Periodically, the authors reevaluated the risk of errors by reviewing the internal error database and improved their quality assurance program as needed. Results: In total, the authors identified over 36 possible treatment planning related failure modes and estimated the associated occurrence, detectability, and severity to calculate the overall risk priority number. Based on the FMEA, the authors implemented various safety improvement procedures into their practice, such as education, peer review, and automatic check tools. The ongoing error tracking database provided realistic data on the frequency of occurrence with which to reevaluate the RPNs for various failure modes. Conclusions: The FMEA technique provides a systematic method for identifying and evaluating potential errors in proton treatment planning before they result in an error in patient dose delivery. The application of FMEA framework and the implementation of an ongoing error tracking system at their clinic have proven to be useful in error reduction in proton treatment planning, thus improving the effectiveness and safety of proton therapy.« less

  16. Integrated risk management

    NASA Technical Reports Server (NTRS)

    Hunsucker, J. L.

    1993-01-01

    The purpose of this report is to first present a basis or foundation for the building of an integrated risk management plan and them to present the plan. The integration referred to is across both the temporal and the hierarchical dimensions. Complexity, consequence, and credibility seem to be driving the need for the consideration of risk. Reduction of personal bias and reproducibility of the decision making process seem to be driving the consideration of a formal risk plan. While risk can be used as either a selection tool or a control tool, this paper concentrates on the selection usage. Risk relies on stated purpose. The tightness of the definition of purpose and success is directly reflected in the definition and control of risk. Much of a risk management plan could be designed by the answers to the questions of why, what, who, when, and where. However, any plan must provide the following information about a threat or risk: likelihood, consequence, predictability, reliability, and reproducibility. While the environment at NASA is seen as warm, but not hot, for the introduction of a risk program, some encouragement is seen if the following problems are addressed: no champion, no commitment of resource, confused definitions, lack of direction and focus, a hard sell, NASA culture, many choices of assessment methods, and cost. The plan is designed to follow the normal method of doing work and is structured to follow either the work break down structure or a functional structure very well. The parts of the plan include: defining purpose and success, initial threat assessment, initial risk assessment, reconciling threats and parameters, putting part of the information down and factoring the information back into the decision process as it comes back up, and developing inferences. Two major suggestions are presented. One is to build an office of risk management to be used as a resource by managers in doing the risk process. Another is to form a pilot program to try out the details in the plan and modify the method where needed.

  17. Minimizing treatment planning errors in proton therapy using failure mode and effects analysis.

    PubMed

    Zheng, Yuanshui; Johnson, Randall; Larson, Gary

    2016-06-01

    Failure mode and effects analysis (FMEA) is a widely used tool to evaluate safety or reliability in conventional photon radiation therapy. However, reports about FMEA application in proton therapy are scarce. The purpose of this study is to apply FMEA in safety improvement of proton treatment planning at their center. The authors performed an FMEA analysis of their proton therapy treatment planning process using uniform scanning proton beams. The authors identified possible failure modes in various planning processes, including image fusion, contouring, beam arrangement, dose calculation, plan export, documents, billing, and so on. For each error, the authors estimated the frequency of occurrence, the likelihood of being undetected, and the severity of the error if it went undetected and calculated the risk priority number (RPN). The FMEA results were used to design their quality management program. In addition, the authors created a database to track the identified dosimetric errors. Periodically, the authors reevaluated the risk of errors by reviewing the internal error database and improved their quality assurance program as needed. In total, the authors identified over 36 possible treatment planning related failure modes and estimated the associated occurrence, detectability, and severity to calculate the overall risk priority number. Based on the FMEA, the authors implemented various safety improvement procedures into their practice, such as education, peer review, and automatic check tools. The ongoing error tracking database provided realistic data on the frequency of occurrence with which to reevaluate the RPNs for various failure modes. The FMEA technique provides a systematic method for identifying and evaluating potential errors in proton treatment planning before they result in an error in patient dose delivery. The application of FMEA framework and the implementation of an ongoing error tracking system at their clinic have proven to be useful in error reduction in proton treatment planning, thus improving the effectiveness and safety of proton therapy.

  18. Technical aspects of home hemodialysis.

    PubMed

    Alhomayeed, B; Lindsay, R M

    2009-03-01

    Home hemodialysis (HHD) has proved to be a useful form of renal replacement therapy. The economic advantage of HHD is well established and interest in it is renewed. Once it has been decided to establish a HHD program, a well developed strategic plan is required. This should address financial and logistical issues and establish policies that will address responsi-bilities of both patients and HD centers. The recruitment of patients is facilitated by ensuring that all incident patients have early access to an education program describing all forms of renal replacement therapy that the regional renal program provides. Patients and members of the pre-dialysis education program should understand the selection process criteria in advance. Once the assessment is completed and the patient agrees to the proceedings, a plan of action should be esta-blished for enrolling the patient into the program and initiating training. Patients' education pro-gram should take into consideration principles of adult learning. When choosing dialysis equip-ment for home use, the needs and preferences of the patients should be respected. As a rule of thumb, the equipment should be simple to use, yet still provide adequate and reliable therapy. De-ciding where to set up and position the HHD equipment is important. Installation of HHD ma-chine at home requires a continuous supply of accessories. Before establishing a HHD program, commitment of the dialysis center to provide and maintain the infrastructure of the program is mandatory. The estimated patients suitable for HHD are less than 15% of all prospective dialysis patients. Generally, those who are have greatly improved quality of life and by using modalities such as nocturnal and daily dialysis can have improved physical well-being with considerable potential cost savings.

  19. RGCA: A Reliable GPU Cluster Architecture for Large-Scale Internet of Things Computing Based on Effective Performance-Energy Optimization

    PubMed Central

    Chen, Qingkui; Zhao, Deyu; Wang, Jingjuan

    2017-01-01

    This paper aims to develop a low-cost, high-performance and high-reliability computing system to process large-scale data using common data mining algorithms in the Internet of Things (IoT) computing environment. Considering the characteristics of IoT data processing, similar to mainstream high performance computing, we use a GPU (Graphics Processing Unit) cluster to achieve better IoT services. Firstly, we present an energy consumption calculation method (ECCM) based on WSNs. Then, using the CUDA (Compute Unified Device Architecture) Programming model, we propose a Two-level Parallel Optimization Model (TLPOM) which exploits reasonable resource planning and common compiler optimization techniques to obtain the best blocks and threads configuration considering the resource constraints of each node. The key to this part is dynamic coupling Thread-Level Parallelism (TLP) and Instruction-Level Parallelism (ILP) to improve the performance of the algorithms without additional energy consumption. Finally, combining the ECCM and the TLPOM, we use the Reliable GPU Cluster Architecture (RGCA) to obtain a high-reliability computing system considering the nodes’ diversity, algorithm characteristics, etc. The results show that the performance of the algorithms significantly increased by 34.1%, 33.96% and 24.07% for Fermi, Kepler and Maxwell on average with TLPOM and the RGCA ensures that our IoT computing system provides low-cost and high-reliability services. PMID:28777325

  20. RGCA: A Reliable GPU Cluster Architecture for Large-Scale Internet of Things Computing Based on Effective Performance-Energy Optimization.

    PubMed

    Fang, Yuling; Chen, Qingkui; Xiong, Neal N; Zhao, Deyu; Wang, Jingjuan

    2017-08-04

    This paper aims to develop a low-cost, high-performance and high-reliability computing system to process large-scale data using common data mining algorithms in the Internet of Things (IoT) computing environment. Considering the characteristics of IoT data processing, similar to mainstream high performance computing, we use a GPU (Graphics Processing Unit) cluster to achieve better IoT services. Firstly, we present an energy consumption calculation method (ECCM) based on WSNs. Then, using the CUDA (Compute Unified Device Architecture) Programming model, we propose a Two-level Parallel Optimization Model (TLPOM) which exploits reasonable resource planning and common compiler optimization techniques to obtain the best blocks and threads configuration considering the resource constraints of each node. The key to this part is dynamic coupling Thread-Level Parallelism (TLP) and Instruction-Level Parallelism (ILP) to improve the performance of the algorithms without additional energy consumption. Finally, combining the ECCM and the TLPOM, we use the Reliable GPU Cluster Architecture (RGCA) to obtain a high-reliability computing system considering the nodes' diversity, algorithm characteristics, etc. The results show that the performance of the algorithms significantly increased by 34.1%, 33.96% and 24.07% for Fermi, Kepler and Maxwell on average with TLPOM and the RGCA ensures that our IoT computing system provides low-cost and high-reliability services.

  1. Parental engagement in preventive parenting programs for child mental health: a systematic review of predictors and strategies to increase engagement

    PubMed Central

    Finan, Samantha J.; Swierzbiolek, Brooke; Priest, Naomi; Warren, Narelle

    2018-01-01

    Background Child mental health problems are now recognised as a key public health concern. Parenting programs have been developed as one solution to reduce children’s risk of developing mental health problems. However, their potential for widespread dissemination is hindered by low parental engagement, which includes intent to enrol, enrolment, and attendance. To increase parental engagement in preventive parenting programs, we need a better understanding of the predictors of engagement, and the strategies that can be used to enhance engagement. Method Employing a PRISMA method, we conducted a systematic review of the predictors of parent engagement and engagement enhancement strategies in preventive parenting programs. Key inclusion criteria included: (1) the intervention is directed primarily at the parent, (2) parent age >18 years, the article is (3) written in English and (4) published between 2004–2016. Stouffer’s method of combining p-values was used to determine whether associations between variables were reliable. Results Twenty-three articles reported a variety of predictors of parental engagement and engagement enhancement strategies. Only one of eleven predictors (child mental health symptoms) demonstrated a reliable association with enrolment (Stouffer’s p < .01). Discussion There was a lack of consistent evidence for predictors of parental engagement. Nonetheless, preliminary evidence suggests that engagement enhancement strategies modelled on theories, such as the Health Belief Model and Theory of Planned Behaviour, may increase parents’ engagement. Systematic review registration PROSPERO CRD42014013664. PMID:29719737

  2. EX6AFS: A data acquisition system for high-speed dispersive EXAFS measurements implemented using object-oriented programming techniques

    NASA Astrophysics Data System (ADS)

    Jennings, Guy; Lee, Peter L.

    1995-02-01

    In this paper we describe the design and implementation of a computerized data-acquisition system for high-speed energy-dispersive EXAFS experiments on the X6A beamline at the National Synchrotron Light Source. The acquisition system drives the stepper motors used to move the components of the experimental setup and controls the readout of the EXAFS spectra. The system runs on a Macintosh IIfx computer and is written entirely in the object-oriented language C++. Large segments of the system are implemented by means of commercial class libraries, specifically the MacApp application framework from Apple, the Rogue Wave class library, and the Hierarchical Data Format datafile format library from the National Center for Supercomputing Applications. This reduces the amount of code that must be written and enhances reliability. The system makes use of several advanced features of C++: Multiple inheritance allows the code to be decomposed into independent software components and the use of exception handling allows the system to be much more reliable in the event of unexpected errors. Object-oriented techniques allow the program to be extended easily as new requirements develop. All sections of the program related to a particular concept are located in a small set of source files. The program will also be used as a prototype for future software development plans for the Basic Energy Science Synchrotron Radiation Center Collaborative Access Team beamlines being designed and built at the Advanced Photon Source.

  3. Project Quality Assurance Plan for research and development services provided by Oak Ridge National Laboratory in support of the Westinghouse Materials Company of Ohio Operable Unit 1 Stabilization Development and Treatability Studies Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gilliam, T.M.

    1991-05-01

    This Project Quality Assurance Plan (PQAP) sets forth the quality assurance (QA) requirements that are applied to those elements of the Westinghouse Materials Company of Ohio (WMCO) Operable Unit 1 support at Oak Ridge National Laboratory (ORNL) project that involve research and development (R D) performed at ORNL. This is in compliance with the applicable criteria of 10 CFR Part 50, Appendix B, ANSI/ASME NQA-1, as specified by Department of Energy (DOE) Oak Ridge Operations (ORO) Order 5700.6B. For this application, NQA-1 is the core QA Program requirements document. QA policy, normally found in the requirements document, is contained herein.more » The requirements of this PQAP apply to project activities that affect the quality and reliability/credibility of research, development, and investigative data and documentation. These activities include the functions of attaining quality objectives and assuring that an appropriate QA program scope is established. The scope of activities affecting quality includes organization; personnel training and qualifications; design control; procurement; material handling and storage; operating procedures; testing, surveillance, and auditing; R D investigative activities and documentation; deficiencies; corrective actions; and QA record keeping. 12 figs.« less

  4. Block 2 SRM conceptual design studies. Volume 1, Book 2: Preliminary development and verification plan

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Activities that will be conducted in support of the development and verification of the Block 2 Solid Rocket Motor (SRM) are described. Development includes design, fabrication, processing, and testing activities in which the results are fed back into the project. Verification includes analytical and test activities which demonstrate SRM component/subassembly/assembly capability to perform its intended function. The management organization responsible for formulating and implementing the verification program is introduced. It also identifies the controls which will monitor and track the verification program. Integral with the design and certification of the SRM are other pieces of equipment used in transportation, handling, and testing which influence the reliability and maintainability of the SRM configuration. The certification of this equipment is also discussed.

  5. Improving the Discipline of Cost Estimation and Analysis

    NASA Technical Reports Server (NTRS)

    Piland, William M.; Pine, David J.; Wilson, Delano M.

    2000-01-01

    The need to improve the quality and accuracy of cost estimates of proposed new aerospace systems has been widely recognized. The industry has done the best job of maintaining related capability with improvements in estimation methods and giving appropriate priority to the hiring and training of qualified analysts. Some parts of Government, and National Aeronautics and Space Administration (NASA) in particular, continue to need major improvements in this area. Recently, NASA recognized that its cost estimation and analysis capabilities had eroded to the point that the ability to provide timely, reliable estimates was impacting the confidence in planning man), program activities. As a result, this year the Agency established a lead role for cost estimation and analysis. The Independent Program Assessment Office located at the Langley Research Center was given this responsibility.

  6. International Space Station Requirement Verification for Commercial Visiting Vehicles

    NASA Technical Reports Server (NTRS)

    Garguilo, Dan

    2017-01-01

    The COTS program demonstrated NASA could rely on commercial providers for safe, reliable, and cost-effective cargo delivery to ISS. The ISS Program has developed a streamlined process to safely integrate commercial visiting vehicles and ensure requirements are met Levy a minimum requirement set (down from 1000s to 100s) focusing on the ISS interface and safety, reducing the level of NASA oversight/insight and burden on the commercial Partner. Partners provide a detailed verification and validation plan documenting how they will show they've met NASA requirements. NASA conducts process sampling to ensure that the established verification processes is being followed. NASA participates in joint verification events and analysis for requirements that require both parties verify. Verification compliance is approved by NASA and launch readiness certified at mission readiness reviews.

  7. 10 CFR 712.19 - Removal from HRP.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OF ENERGY HUMAN RELIABILITY PROGRAM Establishment of and Procedures for the Human Reliability Program... immediately remove that individual from HRP duties pending a determination of the individual's reliability. A... HRP duties pending a determination of the individual's reliability is an interim, precautionary action...

  8. Software reliability: Application of a reliability model to requirements error analysis

    NASA Technical Reports Server (NTRS)

    Logan, J.

    1980-01-01

    The application of a software reliability model having a well defined correspondence of computer program properties to requirements error analysis is described. Requirements error categories which can be related to program structural elements are identified and their effect on program execution considered. The model is applied to a hypothetical B-5 requirement specification for a program module.

  9. Surveyor Management of Hospital Accreditation Program: A Thematic Analysis Conducted in Iran.

    PubMed

    Teymourzadeh, Ehsan; Ramezani, Mozhdeh; Arab, Mohammad; Rahimi Foroushani, Abbas; Akbari Sari, Ali

    2016-05-01

    The surveyors in hospital accreditation program are considered as the core of accreditation programs. So, the reliability and validity of the accreditation program heavily depend on their performance. This study aimed to identify the dimensions and factors affecting surveyor management of hospital accreditation programs in Iran. This qualitative study used a thematic analysis method, and was performed in Iran in 2014. The study participants included experts in the field of hospital accreditation, and were derived from three groups: 1. Policy-makers, administrators, and surveyors of the accreditation bureau, the ministry of health and medical education, Iranian universities of medical science; 2. Healthcare service providers, and 3. University professors and faculty members. The data were collected using semi-structured in-depth interviews. Following text transcription and control of compliance with the original text, MAXQDA10 software was used to code, classify, and organize the interviews in six stages. The findings from the analysis of 21 interviews were first classified in the form of 1347 semantic units, 11 themes, 17 sub-themes, and 248 codes. These were further discussed by an expert panel, which then resulted in the emergence of seven main themes - selection and recruitment of the surveyor team, organization of the surveyor team, planning to perform surveys, surveyor motivation and retention, surveyor training, surveyor assessment, and recommendations - as well as 27 sub-themes, and 112 codes. The dimensions and variables affecting the surveyors' management were identified and classified on the basis of existing scientific methods in the form of a conceptual framework. Using the results of this study, it would certainly be possible to take a great step toward enhancing the reliability of surveys and the quality and safety of services, while effectively managing accreditation program surveyors.

  10. Clean Cities Strategic Planning White Paper: Light Duty Vehicle Fuel Economy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saulsbury, Bo; Hopson, Dr Janet L; Greene, David

    2015-04-01

    Increasing the energy efficiency of motor vehicles is critical to achieving national energy goals of reduced petroleum dependence, protecting the global climate, and promoting continued economic prosperity. Even with fuel economy and greenhouse gas emissions standards and various economic incentives for clean and efficient vehicles, providing reliable and accurate fuel economy information to the public is important to achieving these goals. This white paper reviews the current status of light-duty vehicle fuel economy in the United States and the role of the Department of Energy (DOE) Clean Cities Program in disseminating fuel economy information to the public.

  11. Program for establishing long-time flight service performance of composite materials in the center wing structure of C-130 aircraft. Phase 3: Fabrication

    NASA Technical Reports Server (NTRS)

    Harvill, W. E.; Kays, A. O.

    1974-01-01

    The manufacturing plan for three C-130 aircraft center wing box test articles, selectively reinforced with boron-epoxy composites, is outlined for the following tasks: (1) tooling; (2) metal parts fabrication: (3) reinforcing laminate fabrication; (4) laminate-to-metal parts bonding; and (5) wing box assembly. The criteria used for reliability and quality assurance are discussed, and several solutions to specific manufacturing problems encountered during fabrication are given. For Vol. 1, see N73-13011; for Vol. 2, see N73-22929.

  12. Zero-gravity atmospheric Cloud Physics Experiment Laboratory; Programmatics report

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The programmatics effort included comprehensive analyses in four major areas: (1) work breakdown structure, (2) schedules, (3) costs, and (4) supporting research and technology. These analyses are discussed in detail in the following sections which identify and define the laboratory project development schedule, cost estimates, funding distributions and supporting research and technology requirements. All programmatics analyses are correlated among themselves and with the technical analyses by means of the work breakdown structure which serves as a common framework for program definition. In addition, the programmatic analyses reflect the results of analyses and plans for reliability, safety, test, and maintenance and refurbishment.

  13. CSBF Engineering Overview

    NASA Astrophysics Data System (ADS)

    Orr, Dwayne

    CSBF Engineering Overview Dwayne Orr (Presenting Author) Columbia Scientific Balloon Facility, Palestine, Texas (USA) Dwayne.Orr@csbf.nasa.gov The Columbia Scientific Balloon Facility (CSBF) at Palestine, Texas provides operational and engineering support for the launch of NASA Scientific Balloons. Over the years with the support of the NASA Balloon Program Office, CSBF has developed unique flight systems with the focus of providing a highly reliable, cost effective medium for giving Scientist’s access to a near space environment. This paper will provide an overview of the CSBF flight systems with an emphasis on recent developments and plans for the future.

  14. CSBF Engineering Overview

    NASA Astrophysics Data System (ADS)

    Orr, Dwayne

    The Columbia Scientific Balloon Facility (CSBF) at Palestine, Texas provides operational and engineering support for the launch of NASA Scientific Balloons. Over the years with the support of the NASA Balloon Program Office, CSBF has developed unique flight systems with the focus of providing a highly reliable, cost effective medium for giving Scientist's access to a near space environment. This paper will provide an overview of the CSBF flight systems with an emphasis on recent developments and plans for the future including: RIP Stitch -Parachute Shock Attenuation system, MIP -Micro Instrumentation Package, GAPR -Gondola Automatic Parachute Release system, NASA TDRSS High Gain Antenna system, Superpressure flight video systems

  15. Optimised layout and roadway support planning with integrated intelligent software

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kouniali, S.; Josien, J.P.; Piguet, J.P.

    1996-12-01

    Experience with knowledge-based systems for Layout planning and roadway support dimensioning is on hand in European coal mining since 1985. The systems SOUT (Support choice and dimensioning, 1989), SOUT 2, PLANANK (planning of bolt-support), Exos (layout planning diagnosis. 1994), Sout 3 (1995) have been developed in close cooperation by CdF{sup 1}. INERIS{sup 2} , EMN{sup 3} (France) and RAG{sup 4}, DMT{sup 5}, TH - Aachen{sup 6} (Germany); ISLSP (Integrated Software for Layout and support planning) development is in progress (completion scheduled for July 1996). This new software technology in combination with conventional programming systems, numerical models and existing databases turnedmore » out to be suited for setting-up an intelligent decision aid for layout and roadway support planning. The system enhances reliability of planning and optimises the safety-to-cost ratio for (1) deformation forecast for roadways in seam and surrounding rocks, consideration of the general position of the roadway in the rock mass (zones of increased pressure, position of operating and mined panels); (2) support dimensioning; (3) yielding arches, rigid arches, porch sets, rigid rings, yielding rings and bolting/shotcreting for drifts; (4) yielding arches, rigid arches and porch sets for roadways in seam; and (5) bolt support for gateroads (assessment of exclusion criteria and calculation of the bolting pattern) bolting of face-end zones (feasibility and safety assessment; stability guarantee).« less

  16. Reliability analysis of laminated CMC components through shell subelement techniques

    NASA Technical Reports Server (NTRS)

    Starlinger, A.; Duffy, S. F.; Gyekenyesi, J. P.

    1992-01-01

    An updated version of the integrated design program C/CARES (composite ceramic analysis and reliability evaluation of structures) was developed for the reliability evaluation of CMC laminated shell components. The algorithm is now split in two modules: a finite-element data interface program and a reliability evaluation algorithm. More flexibility is achieved, allowing for easy implementation with various finite-element programs. The new interface program from the finite-element code MARC also includes the option of using hybrid laminates and allows for variations in temperature fields throughout the component.

  17. Reliability of the Client-Centeredness of Goal Setting (C-COGS) Scale in Acquired Brain Injury Rehabilitation.

    PubMed

    Doig, Emmah; Prescott, Sarah; Fleming, Jennifer; Cornwell, Petrea; Kuipers, Pim

    2016-01-01

    To examine the internal reliability and test-retest reliability of the Client-Centeredness of Goal Setting (C-COGS) scale. The C-COGS scale was administered to 42 participants with acquired brain injury after completion of multidisciplinary goal planning. Internal reliability of scale items was examined using item-partial total correlations and Cronbach's α coefficient. The scale was readministered within a 1-mo period to a subsample of 12 participants to examine test-retest reliability by calculating exact and close percentage agreement for each item. After examination of item-partial total correlations, test items were revised. The revised items demonstrated stronger internal consistency than the original items. Preliminary evaluation of test-retest reliability was fair, with an average exact percent agreement across all test items of 67%. Findings support the preliminary reliability of the C-COGS scale as a tool to evaluate and promote client-centered goal planning in brain injury rehabilitation. Copyright © 2016 by the American Occupational Therapy Association, Inc.

  18. Multistage Stochastic Programming and its Applications in Energy Systems Modeling and Optimization

    NASA Astrophysics Data System (ADS)

    Golari, Mehdi

    Electric energy constitutes one of the most crucial elements to almost every aspect of life of people. The modern electric power systems face several challenges such as efficiency, economics, sustainability, and reliability. Increase in electrical energy demand, distributed generations, integration of uncertain renewable energy resources, and demand side management are among the main underlying reasons of such growing complexity. Additionally, the elements of power systems are often vulnerable to failures because of many reasons, such as system limits, weak conditions, unexpected events, hidden failures, human errors, terrorist attacks, and natural disasters. One common factor complicating the operation of electrical power systems is the underlying uncertainties from the demands, supplies and failures of system components. Stochastic programming provides a mathematical framework for decision making under uncertainty. It enables a decision maker to incorporate some knowledge of the intrinsic uncertainty into the decision making process. In this dissertation, we focus on application of two-stage and multistage stochastic programming approaches to electric energy systems modeling and optimization. Particularly, we develop models and algorithms addressing the sustainability and reliability issues in power systems. First, we consider how to improve the reliability of power systems under severe failures or contingencies prone to cascading blackouts by so called islanding operations. We present a two-stage stochastic mixed-integer model to find optimal islanding operations as a powerful preventive action against cascading failures in case of extreme contingencies. Further, we study the properties of this problem and propose efficient solution methods to solve this problem for large-scale power systems. We present the numerical results showing the effectiveness of the model and investigate the performance of the solution methods. Next, we address the sustainability issue considering the integration of renewable energy resources into production planning of energy-intensive manufacturing industries. Recently, a growing number of manufacturing companies are considering renewable energies to meet their energy requirements to move towards green manufacturing as well as decreasing their energy costs. However, the intermittent nature of renewable energies imposes several difficulties in long term planning of how to efficiently exploit renewables. In this study, we propose a scheme for manufacturing companies to use onsite and grid renewable energies provided by their own investments and energy utilities as well as conventional grid energy to satisfy their energy requirements. We propose a multistage stochastic programming model and study an efficient solution method to solve this problem. We examine the proposed framework on a test case simulated based on a real-world semiconductor company. Moreover, we evaluate long-term profitability of such scheme via so called value of multistage stochastic programming.

  19. HiRel: Hybrid Automated Reliability Predictor (HARP) integrated reliability tool system, (version 7.0). Volume 3: HARP Graphics Oriented (GO) input user's guide

    NASA Technical Reports Server (NTRS)

    Bavuso, Salvatore J.; Rothmann, Elizabeth; Mittal, Nitin; Koppen, Sandra Howell

    1994-01-01

    The Hybrid Automated Reliability Predictor (HARP) integrated Reliability (HiRel) tool system for reliability/availability prediction offers a toolbox of integrated reliability/availability programs that can be used to customize the user's application in a workstation or nonworkstation environment. HiRel consists of interactive graphical input/output programs and four reliability/availability modeling engines that provide analytical and simulative solutions to a wide host of highly reliable fault-tolerant system architectures and is also applicable to electronic systems in general. The tool system was designed at the outset to be compatible with most computing platforms and operating systems, and some programs have been beta tested within the aerospace community for over 8 years. This document is a user's guide for the HiRel graphical preprocessor Graphics Oriented (GO) program. GO is a graphical user interface for the HARP engine that enables the drawing of reliability/availability models on a monitor. A mouse is used to select fault tree gates or Markov graphical symbols from a menu for drawing.

  20. Final Technical Report for Contract No. DE-EE0006332, "Integrated Simulation Development and Decision Support Tool-Set for Utility Market and Distributed Solar Power Generation"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cormier, Dallas; Edra, Sherwin; Espinoza, Michael

    This project will enable utilities to develop long-term strategic plans that integrate high levels of renewable energy generation, and to better plan power system operations under high renewable penetration. The program developed forecast data streams for decision support and effective integration of centralized and distributed solar power generation in utility operations. This toolset focused on real time simulation of distributed power generation within utility grids with the emphasis on potential applications in day ahead (market) and real time (reliability) utility operations. The project team developed and demonstrated methodologies for quantifying the impact of distributed solar generation on core utility operations,more » identified protocols for internal data communication requirements, and worked with utility personnel to adapt the new distributed generation (DG) forecasts seamlessly within existing Load and Generation procedures through a sophisticated DMS. This project supported the objectives of the SunShot Initiative and SUNRISE by enabling core utility operations to enhance their simulation capability to analyze and prepare for the impacts of high penetrations of solar on the power grid. The impact of high penetration solar PV on utility operations is not only limited to control centers, but across many core operations. Benefits of an enhanced DMS using state-of-the-art solar forecast data were demonstrated within this project and have had an immediate direct operational cost savings for Energy Marketing for Day Ahead generation commitments, Real Time Operations, Load Forecasting (at an aggregate system level for Day Ahead), Demand Response, Long term Planning (asset management), Distribution Operations, and core ancillary services as required for balancing and reliability. This provided power system operators with the necessary tools and processes to operate the grid in a reliable manner under high renewable penetration.« less

  1. Validity and reliability analysis of the planned behavior theory scale related to the testicular self-examination in a Turkish context.

    PubMed

    Iyigun, Emine; Tastan, Sevinc; Ayhan, Hatice; Kose, Gulsah; Acikel, Cengizhan

    2016-06-01

    This study aimed to determine the validity and reliability levels of the Planned Behavior Theory Scale as related to a testicular self-examination. The study was carried out in a health-profession higher-education school in Ankara, Turkey, from April to June 2012. The study participants comprised 215 male students. Study data were collected by using a questionnaire, a planned behavior theory scale related to testicular self-examination, and Champion's Health Belief Model Scale (CHBMS). The sub-dimensions of the planned behavior theory scale, namely those of intention, attitude, subjective norms and self-efficacy, were found to have Cronbach's alpha values of between 0.81 and 0.89. Exploratory factor analysis showed that items of the scale had five factors that accounted for 75% of the variance. Of these, the sub-dimension of intention was found to have the highest level of contribution. A significant correlation was found between the sub-dimensions of the testicular self-examination planned behavior theory scale and those of CHBMS (p < 0.05). The findings suggest that the Turkish version of the testicular self-examination Planned Behavior Theory Scale is a valid and reliable measurement for Turkish society.

  2. Autonomous satellite command and control: A comparison with other military systems

    NASA Technical Reports Server (NTRS)

    Kruchten, Robert J.; Todd, Wayne

    1988-01-01

    Existing satellite concepts of operation depend on readily available experts and are extremely manpower intensive. Areas of expertise required include mission planning, mission data interpretation, telemetry monitoring, and anomaly resolution. The concepts of operation have envolved to their current state in part because space systems have tended to be treated more as research and development assets rather than as operational assets. These methods of satellite command and control will be inadequate in the future because of the availability, survivability, and capability of human experts. Because space systems have extremely high reliability and limited access, they offer challenges not found in other military systems. Thus, automation techniques used elsewhere are not necessarily applicable to space systems. A program to make satellites much more autonomous has been developed, using a variety of advanced software techniques. The problem the program is addressing, some possible solutions, the goals of the Rome Air Development Center (RADC) program, the rationale as to why the goals are reasonable, and the current program status are discussed. Also presented are some of the concepts used in the program and how they differ from more traditional approaches.

  3. Space technology research plans

    NASA Technical Reports Server (NTRS)

    Hook, W. Ray

    1992-01-01

    Development of new technologies is the primary purpose of the Office of Aeronautics and Space Technology (OAST). OAST's mission includes the following two goals: (1) to conduct research to provide fundamental understanding, develop advanced technology and promote technology transfer to assure U.S. preeminence in aeronautics and to enhance and/or enable future civil space missions: and (2) to provide unique facilities and technical expertise to support national aerospace needs. OAST includes both NASA Headquarters operations as well as programmatic and institutional management of the Ames Research Center, the Langley Research Center and the Lewis Research Center. In addition. a considerable portion of OAST's Space R&T Program is conducted through the flight and science program field centers of NASA. Within OAST, the Space Technology Directorate is responsible for the planning and implementation of the NASA Space Research and Technology Program. The Space Technology Directorate's mission is 'to assure that OAST shall provide technology for future civil space missions and provide a base of research and technology capabilities to serve all national space goals.' Accomplishing this mission entails the following objectives: y Identify, develop, validate and transfer technology to: (1) increase mission safety and reliability; (2) reduce flight program development and operations costs; (3) enhance mission performance; and (4) enable new missions. Provide the capability to: (1) advance technology in critical disciplines; and (2) respond to unanticipated mission needs. In-space experiments are an integral part of OAST's program and provides for experimental studies, development and support for in-space flight research and validation of advanced space technologies. Conducting technology experiments in space is a valuable and cost effective way to introduce advanced technologies into flight programs. These flight experiments support both the R&T base and the focussed programs within OAST.

  4. Availability Estimation for Facilities in Extreme Geographical Locations

    NASA Technical Reports Server (NTRS)

    Fischer, Gerd M.; Omotoso, Oluseun; Chen, Guangming; Evans, John W.

    2012-01-01

    A value added analysis for the Reliability. Availability and Maintainability of McMurdo Ground Station was developed, which will be a useful tool for system managers in sparing, maintenance planning and determining vital performance metrics needed for readiness assessment of the upgrades to the McMurdo System. Output of this study can also be used as inputs and recommendations for the application of Reliability Centered Maintenance (RCM) for the system. ReliaSoft's BlockSim. a commercial Reliability Analysis software package, has been used to model the availability of the system upgrade to the National Aeronautics and Space Administration (NASA) Near Earth Network (NEN) Ground Station at McMurdo Station in the Antarctica. The logistics challenges due to the closure of access to McMurdo Station during the Antarctic winter was modeled using a weighted composite of four Weibull distributions. one of the possible choices for statistical distributions throughout the software program and usually used to account for failure rates of components supplied by different manufacturers. The inaccessibility of the antenna site on a hill outside McMurdo Station throughout one year due to severe weather was modeled with a Weibull distribution for the repair crew availability. The Weibull distribution is based on an analysis of the available weather data for the antenna site for 2007 in combination with the rules for travel restrictions due to severe weather imposed by the administrating agency, the National Science Foundation (NSF). The simulations resulted in an upper bound for the system availability and allowed for identification of components that would improve availability based on a higher on-site spare count than initially planned.

  5. A Capacity Forecast Model for Volatile Data in Maintenance Logistics

    NASA Astrophysics Data System (ADS)

    Berkholz, Daniel

    2009-05-01

    Maintenance, repair and overhaul processes (MRO processes) are elaborate and complex. Rising demands on these after sales services require reliable production planning and control methods particularly for maintaining valuable capital goods. Downtimes lead to high costs and an inability to meet delivery due dates results in severe contract penalties. Predicting the required capacities for maintenance orders in advance is often difficult due to unknown part conditions unless the goods are actually inspected. This planning uncertainty results in extensive capital tie-up by rising stock levels within the whole MRO network. The article outlines an approach to planning capacities when maintenance data forecasting is volatile. It focuses on the development of prerequisites for a reliable capacity planning model. This enables a quick response to maintenance orders by employing appropriate measures. The information gained through the model is then systematically applied to forecast both personnel capacities and the demand for spare parts. The improved planning reliability can support MRO service providers in shortening delivery times and reducing stock levels in order to enhance the performance of their maintenance logistics.

  6. Using the Knowledge, Process, Practice (KPP) model for driving the design and development of online postgraduate medical education.

    PubMed

    Shaw, Tim; Barnet, Stewart; Mcgregor, Deborah; Avery, Jennifer

    2015-01-01

    Online learning is a primary delivery method for continuing health education programs. It is critical that programs have curricula objectives linked to educational models that support learning. Using a proven educational modelling process ensures that curricula objectives are met and a solid basis for learning and assessment is achieved. To develop an educational design model that produces an educationally sound program development plan for use by anyone involved in online course development. We have described the development of a generic educational model designed for continuing health education programs. The Knowledge, Process, Practice (KPP) model is founded on recognised educational theory and online education practice. This paper presents a step-by-step guide on using this model for program development that encases reliable learning and evaluation. The model supports a three-step approach, KPP, based on learning outcomes and supporting appropriate assessment activities. It provides a program structure for online or blended learning that is explicit, educationally defensible, and supports multiple assessment points for health professionals. The KPP model is based on best practice educational design using a structure that can be adapted for a variety of online or flexibly delivered postgraduate medical education programs.

  7. Protocols for collection of streamflow, water-quality, streambed-sediment, periphyton, macroinvertebrate, fish, and habitat data to describe stream quality for the Hydrobiological Monitoring Program, Equus Beds Aquifer Storage and Recovery Program, city of Wichita, Kansas

    USGS Publications Warehouse

    Stone, Mandy L.; Rasmussen, Teresa J.; Bennett, Trudy J.; Poulton, Barry C.; Ziegler, Andrew C.

    2012-01-01

    The city of Wichita, Kansas uses the Equus Beds aquifer, one of two sources, for municipal water supply. To meet future water needs, plans for artificial recharge of the aquifer have been implemented in several phases. Phase I of the Equus Beds Aquifer Storage and Recovery (ASR) Program began with injection of water from the Little Arkansas River into the aquifer for storage and subsequent recovery in 2006. Construction of a river intake structure and surface-water treatment plant began as implementation of Phase II of the Equus Beds ASR Program in 2010. An important aspect of the ASR Program is the monitoring of water quality and the effects of recharge activities on stream conditions. Physical, chemical, and biological data provide the basis for an integrated assessment of stream quality. This report describes protocols for collecting streamflow, water-quality, streambed-sediment, periphyton, macroinvertebrate, fish, and habitat data as part of the city of Wichita's hydrobiological monitoring program (HBMP). Following consistent and reliable methods for data collection and processing is imperative for the long-term success of the monitoring program.

  8. 76 FR 64082 - Mandatory Reliability Standards for the Bulk-Power System; Notice of Staff Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... Reliability Standards for the Bulk-Power System; Notice of Staff Meeting Take notice that the Federal Energy... reliability implications to the interconnected transmission system associated with a single point of failure... R1.3.10 of Commission-approved transmission planning Reliability Standard TPL-002- 0 (System...

  9. 3D planning in orthognathic surgery: CAD/CAM surgical splints and prediction of the soft and hard tissues results - our experience in 16 cases.

    PubMed

    Aboul-Hosn Centenero, Samir; Hernández-Alfaro, Federico

    2012-02-01

    The aim of this article is to determine the advantages of 3D planning in predicting postoperative results and manufacturing surgical splints using CAD/CAM (Computer Aided Design/Computer Aided Manufacturing) technology in orthognathic surgery when the software program Simplant OMS 10.1 (Materialise(®), Leuven, Belgium) was used for the purpose of this study which was carried out on 16 patients. A conventional preoperative treatment plan was devised for each patient following our Centre's standard protocol, and surgical splints were manufactured. These splints were used as study controls. The preoperative treatment plans devised were then transferred to a 3D-virtual environment on a personal computer (PC). Surgery was simulated, the prediction of results on soft and hard tissue produced, and surgical splints manufactured using CAD/CAM technology. In the operating room, both types of surgical splints were compared and the degree of similitude in results obtained in three planes was calculated. The maxillary osteotomy line was taken as the point of reference. The level of concordance was used to compare the surgical splints. Three months after surgery a second set of 3D images were obtained and used to obtain linear and angular measurements on screen. Using the Intraclass Correlation Coefficient these postoperative measurements were compared with the measurements obtained when predicting postoperative results. Results showed that a high degree of correlation in 15 of the 16 cases. A high coefficient of correlation was obtained in the majority of predictions of results in hard tissue, although less precise results were obtained in measurements in soft tissue in the labial area. The study shows that the software program used in the study is reliable for 3D planning and for the manufacture of surgical splints using CAD/CAM technology. Nevertheless, further progress in the development of technologies for the acquisition of 3D images, new versions of software programs, and further studies of objective data are necessary to increase precision in computerised 3D planning. Copyright © 2011 European Association for Cranio-Maxillo-Facial Surgery. Published by Elsevier Ltd. All rights reserved.

  10. Reliability, return periods, and risk under nonstationarity

    NASA Astrophysics Data System (ADS)

    Read, Laura K.; Vogel, Richard M.

    2015-08-01

    Water resources design has widely used the average return period as a concept to inform management and communication of the risk of experiencing an exceedance event within a planning horizon. Even though nonstationarity is often apparent, in practice hydrologic design often mistakenly assumes that the probability of exceedance, p, is constant from year to year which leads to an average return period To equal to 1/p; this expression is far more complex under nonstationarity. Even for stationary processes, the common application of an average return period is problematic: it does not account for planning horizon, is an average value that may not be representative of the time to the next flood, and is generally not applied in other areas of water planning. We combine existing theoretical and empirical results from the literature to provide the first general, comprehensive description of the probabilistic behavior of the return period and reliability under nonstationarity. We show that under nonstationarity, the underlying distribution of the return period exhibits a more complex shape than the exponential distribution under stationary conditions. Using a nonstationary lognormal model, we document the increased complexity and challenges associated with planning for future flood events over a planning horizon. We compare application of the average return period with the more common concept of reliability and recommend replacing the average return period with reliability as a more practical way to communicate event likelihood in both stationary and nonstationary contexts.

  11. Orbital Space Plane (OSP) Program

    NASA Technical Reports Server (NTRS)

    McKenzie, Patrick M.

    2003-01-01

    Lockheed Martin has been an active participant in NASA's Space Launch Initiative (SLI) programs over the past several years. SLI, part of NASA's Integrated Space Transportation Plan (ISTP), was restructured in November of 2002 to focus the overall theme of safer, more afford-able space transportation along two paths - the Orbital Space Plane Program and the Next Generation Launch Technology programs. The Orbital Space Plane Program has the goal of providing rescue capability from the International Space Station by 2008 and transfer capability for crew (and limited cargo) by 2012. The Next Generation Launch Technology program is combining research and development efforts from the 2nd Generation Reusable Launch Vehicle (2GRLV) program with cutting-edge, advanced space transportation programs (previously designated 3rd Generation) into one program aimed at enabling safe, reliable, cost-effective reusable launch systems by the middle of the next decade. Lockheed Martin is one of three prime contractors working to bring Orbital Space Plane system concepts to a system definition level of maturity by December of 2003. This paper and presentation will update the international community on the progress of the' OSP program, from an industry perspective, and provide insights into Lockheed Martin's role in enabling the vision of a safer, more affordable means of taking people to and from space.

  12. Examples of Nonconservatism in the CARE 3 Program

    NASA Technical Reports Server (NTRS)

    Dotson, Kelly J.

    1988-01-01

    This paper presents parameter regions in the CARE 3 (Computer-Aided Reliability Estimation version 3) computer program where the program overestimates the reliability of a modeled system without warning the user. Five simple models of fault-tolerant computer systems are analyzed; and, the parameter regions where reliability is overestimated are given. The source of the error in the reliability estimates for models which incorporate transient fault occurrences was not readily apparent. However, the source of much of the error for models with permanent and intermittent faults can be attributed to the choice of values for the run-time parameters of the program.

  13. Software For Computing Reliability Of Other Software

    NASA Technical Reports Server (NTRS)

    Nikora, Allen; Antczak, Thomas M.; Lyu, Michael

    1995-01-01

    Computer Aided Software Reliability Estimation (CASRE) computer program developed for use in measuring reliability of other software. Easier for non-specialists in reliability to use than many other currently available programs developed for same purpose. CASRE incorporates mathematical modeling capabilities of public-domain Statistical Modeling and Estimation of Reliability Functions for Software (SMERFS) computer program and runs in Windows software environment. Provides menu-driven command interface; enabling and disabling of menu options guides user through (1) selection of set of failure data, (2) execution of mathematical model, and (3) analysis of results from model. Written in C language.

  14. Planning for an Aging America: The Void in Reliable Data. Hearing before the Select Committee on Aging. House of Representatives, One Hundredth Congress, First Session (October 20, 1987).

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. House Select Committee on Aging.

    This document contains testimonies and prepared statements from the Congressional hearing called to examine the difficulties associated with the lack of reliable demographic data for use in planning appropriate assistance to "special populations" of older Americans, including minorities, persons with disabilities, the rural elderly,…

  15. Assessing Assessment Texts: Where Is Planning?

    ERIC Educational Resources Information Center

    Fives, Helenrose; Barnes, Nicole; Dacey, Charity; Gillis, Anna

    2016-01-01

    We conducted a content analysis of 27 assessment textbooks to determine how assessment planning was framed in texts for preservice teachers. We identified eight assessment planning themes: alignment, assessment purpose and types, reliability and validity, writing goals and objectives, planning specific assessments, unpacking, overall assessment…

  16. Centralized Alert-Processing and Asset Planning for Sensorwebs

    NASA Technical Reports Server (NTRS)

    Castano, Rebecca; Chien, Steve A.; Rabideau, Gregg R.; Tang, Benyang

    2010-01-01

    A software program provides a Sensorweb architecture for alert-processing, event detection, asset allocation and planning, and visualization. It automatically tasks and re-tasks various types of assets such as satellites and robotic vehicles in response to alerts (fire, weather) extracted from various data sources, including low-level Webcam data. JPL has adapted cons iderable Sensorweb infrastructure that had been previously applied to NASA Earth Science applications. This NASA Earth Science Sensorweb has been in operational use since 2003, and has proven reliability of the Sensorweb technologies for robust event detection and autonomous response using space and ground assets. Unique features of the software include flexibility to a range of detection and tasking methods including those that require aggregation of data over spatial and temporal ranges, generality of the response structure to represent and implement a range of response campaigns, and the ability to respond rapidly.

  17. Evaluation of low-residue soldering for military and commercial applications: A report from the Low-Residue Soldering Task Force

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Iman, R.L.; Anderson, D.J.; Burress, R.V.

    1995-06-01

    The LRSTF combined the efforts of industry, military, and government to evaluate low-residue soldering processes for military and commercial applications. These processes were selected for evaluation because they provide a means for the military to support the presidential mandate while producing reliable hardware at a lower cost. This report presents the complete details and results of a testing program conducted by the LRSTF to evaluate low-residue soldering for printed wiring assemblies. A previous informal document provided details of the test plan used in this evaluation. Many of the details of that test plan are contained in this report. The testmore » data are too massive to include in this report, however, these data are available on disk as Excel spreadsheets upon request. The main purpose of low-residue soldering is to eliminate waste streams during the manufacturing process.« less

  18. Constraining uncertainties in water supply reliability in a tropical data scarce basin

    NASA Astrophysics Data System (ADS)

    Kaune, Alexander; Werner, Micha; Rodriguez, Erasmo; de Fraiture, Charlotte

    2015-04-01

    Assessing the water supply reliability in river basins is essential for adequate planning and development of irrigated agriculture and urban water systems. In many cases hydrological models are applied to determine the surface water availability in river basins. However, surface water availability and variability is often not appropriately quantified due to epistemic uncertainties, leading to water supply insecurity. The objective of this research is to determine the water supply reliability in order to support planning and development of irrigated agriculture in a tropical, data scarce environment. The approach proposed uses a simple hydrological model, but explicitly includes model parameter uncertainty. A transboundary river basin in the tropical region of Colombia and Venezuela with an approximately area of 2100 km² was selected as a case study. The Budyko hydrological framework was extended to consider climatological input variability and model parameter uncertainty, and through this the surface water reliability to satisfy the irrigation and urban demand was estimated. This provides a spatial estimate of the water supply reliability across the basin. For the middle basin the reliability was found to be less than 30% for most of the months when the water is extracted from an upstream source. Conversely, the monthly water supply reliability was high (r>98%) in the lower basin irrigation areas when water was withdrawn from a source located further downstream. Including model parameter uncertainty provides a complete estimate of the water supply reliability, but that estimate is influenced by the uncertainty in the model. Reducing the uncertainty in the model through improved data and perhaps improved model structure will improve the estimate of the water supply reliability allowing better planning of irrigated agriculture and dependable water allocation decisions.

  19. Reliability analysis in the Office of Safety, Environmental, and Mission Assurance (OSEMA)

    NASA Astrophysics Data System (ADS)

    Kauffmann, Paul J.

    1994-12-01

    The technical personnel in the SEMA office are working to provide the highest degree of value-added activities to their support of the NASA Langley Research Center mission. Management perceives that reliability analysis tools and an understanding of a comprehensive systems approach to reliability will be a foundation of this change process. Since the office is involved in a broad range of activities supporting space mission projects and operating activities (such as wind tunnels and facilities), it was not clear what reliability tools the office should be familiar with and how these tools could serve as a flexible knowledge base for organizational growth. Interviews and discussions with the office personnel (both technicians and engineers) revealed that job responsibilities ranged from incoming inspection to component or system analysis to safety and risk. It was apparent that a broad base in applied probability and reliability along with tools for practical application was required by the office. A series of ten class sessions with a duration of two hours each was organized and scheduled. Hand-out materials were developed and practical examples based on the type of work performed by the office personnel were included. Topics covered were: Reliability Systems - a broad system oriented approach to reliability; Probability Distributions - discrete and continuous distributions; Sampling and Confidence Intervals - random sampling and sampling plans; Data Analysis and Estimation - Model selection and parameter estimates; and Reliability Tools - block diagrams, fault trees, event trees, FMEA. In the future, this information will be used to review and assess existing equipment and processes from a reliability system perspective. An analysis of incoming materials sampling plans was also completed. This study looked at the issues associated with Mil Std 105 and changes for a zero defect acceptance sampling plan.

  20. Reliability analysis in the Office of Safety, Environmental, and Mission Assurance (OSEMA)

    NASA Technical Reports Server (NTRS)

    Kauffmann, Paul J.

    1994-01-01

    The technical personnel in the SEMA office are working to provide the highest degree of value-added activities to their support of the NASA Langley Research Center mission. Management perceives that reliability analysis tools and an understanding of a comprehensive systems approach to reliability will be a foundation of this change process. Since the office is involved in a broad range of activities supporting space mission projects and operating activities (such as wind tunnels and facilities), it was not clear what reliability tools the office should be familiar with and how these tools could serve as a flexible knowledge base for organizational growth. Interviews and discussions with the office personnel (both technicians and engineers) revealed that job responsibilities ranged from incoming inspection to component or system analysis to safety and risk. It was apparent that a broad base in applied probability and reliability along with tools for practical application was required by the office. A series of ten class sessions with a duration of two hours each was organized and scheduled. Hand-out materials were developed and practical examples based on the type of work performed by the office personnel were included. Topics covered were: Reliability Systems - a broad system oriented approach to reliability; Probability Distributions - discrete and continuous distributions; Sampling and Confidence Intervals - random sampling and sampling plans; Data Analysis and Estimation - Model selection and parameter estimates; and Reliability Tools - block diagrams, fault trees, event trees, FMEA. In the future, this information will be used to review and assess existing equipment and processes from a reliability system perspective. An analysis of incoming materials sampling plans was also completed. This study looked at the issues associated with Mil Std 105 and changes for a zero defect acceptance sampling plan.

  1. Measuring pregnancy planning: A psychometric evaluation and comparison of two scales.

    PubMed

    Drevin, Jennifer; Kristiansson, Per; Stern, Jenny; Rosenblad, Andreas

    2017-11-01

    To psychometrically test the London Measure of Unplanned Pregnancy and compare it with the Swedish Pregnancy Planning Scale. The incidence of unplanned pregnancies is an important indicator of reproductive health. The London Measure of Unplanned Pregnancy measures pregnancy planning by taking contraceptive use, timing, intention to become pregnant, desire for pregnancy, partner agreement, and pre-conceptual preparations into account. It has, however, previously not been psychometrically evaluated using confirmatory factor analysis. The Likert-scored single-item Swedish Pregnancy Planning Scale has been developed to measure the woman's own view of pregnancy planning level. Cross-sectional design. In 2012-2013, 5493 pregnant women living in Sweden were invited to participate in the Swedish Pregnancy Planning study, of whom 3327 (61%) agreed to participate and answered a questionnaire. A test-retest pilot study was conducted in 2011-2012. Thirty-two participants responded to the questionnaire on two occasions 14 days apart. Data were analysed using confirmatory factor analysis, Cohen's weighted kappa and Spearman's correlation. All items of the London Measure of Unplanned Pregnancy contributed to measuring pregnancy planning, but four items had low item-reliability. The London Measure of Unplanned Pregnancy and Swedish Pregnancy Planning Scale corresponded reasonably well with each other and both showed good test-retest reliability. The London Measure of Unplanned Pregnancy may benefit from item reduction and its usefulness may be questioned. The Swedish Pregnancy Planning Scale is time-efficient and shows acceptable reliability and construct validity, which makes it more useful for measuring pregnancy planning. © 2017 John Wiley & Sons Ltd.

  2. Orbital Space Plane (OSP) Program at Lockheed Martin

    NASA Technical Reports Server (NTRS)

    Ford, Robert

    2003-01-01

    Lockheed Martin has been an active participant in NASA's Space Launch Initiative (SLI) programs over the past several years. SLI, part of NASA's Integrated Space Transportation Plan (ISTP), was restructured in November 2002 to focus the overall theme of safer, more affordable space transportation along two paths the Orbital Space Plane (OSP) and the Next Generation Launch Technology programs. The Orbital Space Plane program has the goal of providing rescue capability from the International Space Station by 2008 or earlier and transfer capability for crew (and contingency cargo) by 2012. The Next Generation Launch Technology program is combining research and development efforts from the 2d Generation Reusable Launch Vehicle (2GRLV) program with cutting-edge, advanced space transportation programs (previously designated 31d Generation) into one program aimed at enabling safe, reliable, cost-effective reusable launch systems by the middle of the next decade. Lockheed Martin is one of three prime contractors working to bring Orbital Space Plane system concepts to a system design level of maturity by December 2003. This paper and presentation will update the aerospace community on the progress of the OSP program, from an industry perspective, and provide insights into Lockheed Martin's role in enabling the vision of a safer, more affordable means of taking people to and from space.

  3. An interagency space nuclear propulsion safety policy for SEI - Issues and discussion

    NASA Technical Reports Server (NTRS)

    Marshall, A. C.; Sawyer, J. C., Jr.

    1991-01-01

    An interagency Nuclear Safety Policy Working Group (NSPWG) was chartered to recommend nuclear safety policy, requirements, and guidelines for the Space Exploration Initiative nuclear propulsion program to facilitate the implementation of mission planning and conceptual design studies. The NSPWG developed a top level policy to provide the guiding principles for the development and implementation of the nuclear propulsion safety program and the development of Safety Functional Requirements. In addition, the NSPWG reviewed safety issues for nuclear propulsion and recommended top level safety requirements and guidelines to address these issues. Safety topics include reactor start-up, inadvertent criticality, radiological release and exposure, disposal, entry, safeguards, risk/reliability, operational safety, ground testing, and other considerations. In this paper the emphasis is placed on the safety policy and the issues and considerations that are addressed by the NSPWG recommendations.

  4. NSPWG-recommended safety requirements and guidelines for SEI nuclear propulsion

    NASA Technical Reports Server (NTRS)

    Marshall, Albert C.; Sawyer, J. C., Jr.; Bari, Robert A.; Brown, Neil W.; Cullingford, Hatice S.; Hardy, Alva C.; Lee, James H.; Mcculloch, William H.; Niederauer, George F.; Remp, Kerry

    1992-01-01

    An interagency Nuclear Safety Policy Working Group (NSPWG) was chartered to recommend nuclear safety policy, requirements, and guidelines for the Space Exploration Initiative (SEI) nuclear propulsion program to facilitate the implementation of mission planning and conceptual design studies. The NSPWG developed a top-level policy to provide the guiding principles for the development and implementation of the nuclear propulsion safety program and the development of safety functional requirements. In addition, the NSPWG reviewed safety issues for nuclear propulsion and recommended top-level safety requirements and guidelines to address these issues. Safety requirements were developed for reactor start-up, inadvertent criticality, radiological release and exposure, disposal, entry, and safeguards. Guidelines were recommended for risk/reliability, operational safety, flight trajectory and mission abort, space debris and meteoroids, and ground test safety. In this paper the specific requirements and guidelines will be discussed.

  5. The Medicare Health Outcomes Survey program: overview, context, and near-term prospects.

    PubMed

    Jones, Nathaniel; Jones, Stephanie L; Miller, Nancy A

    2004-07-12

    In 1996, the Centers for Medicare & Medicaid Services (CMS) initiated the Medicare Health Outcomes Survey (HOS). It is the first national survey to measure the quality of life and functional health status of Medicare beneficiaries enrolled in managed care. The program seeks to gather valid and reliable health status data in Medicare managed care for use in quality improvement activities, public reporting, plan accountability and improving health outcomes based on competition. The context that led to the development of the HOS was formed by the convergence of the following factors: 1) a recognized need to monitor the performance of managed care plans, 2) technical expertise and advancement in the areas of quality measurement and health outcomes assessment, 3) the existence of a tested functional health status assessment tool (SF-36)1, which was valid for an elderly population, 4) CMS leadership, and 5) political interest in quality improvement. Since 1998, there have been six baseline surveys and four follow up surveys. CMS, working with its partners, performs the following tasks as part of the HOS program: 1) Supports the technical/scientific development of the HOS measure, 2) Certifies survey vendors, 3) Collects Health Plan Employer Data and Information Set(HEDIS)2 HOS data, 4) Cleans, scores, and disseminates annual rounds of HOS data, public use files and reports to CMS, Quality Improvement Organizations (QIOs), Medicare+Choice Organizations (M+COs), and other stakeholders, 5) Trains M+COs and QIOs in the use of functional status measures and best practices for improving care, 6) Provides technical assistance to CMS, QIOs, M+COs and other data users, and 7) Conducts analyses using HOS data to support CMS and HHS priorities.CMS has recently sponsored an evaluation of the HOS program, which will provide the information necessary to enhance the future administration of the program. Information collected to date reveals that the HOS program is a valuable tool that provides a rich set of data that is useful for quality monitoring and improvement efforts. To enhance the future of the HOS program, many stakeholders recommend the implementation of incentives to encourage the use of the data, while others identify the need to monitor the health status of plan disenrollees.Overall, the HOS program represents an important vehicle for collecting outcomes data from Medicare beneficiaries. The new Medicare Prescription Drug, Improvement, and Modernization Act (2003) mandates the collection and use of data for outcomes measurement. Consequently, it is important to improve HOS to most effectively meet the mandate.

  6. Reliability analysis of laminated CMC components through shell subelement techniques

    NASA Technical Reports Server (NTRS)

    Starlinger, Alois; Duffy, Stephen F.; Gyekenyesi, John P.

    1992-01-01

    An updated version of the integrated design program Composite Ceramics Analysis and Reliability Evaluation of Structures (C/CARES) was developed for the reliability evaluation of ceramic matrix composites (CMC) laminated shell components. The algorithm is now split into two modules: a finite-element data interface program and a reliability evaluation algorithm. More flexibility is achieved, allowing for easy implementation with various finite-element programs. The interface program creates a neutral data base which is then read by the reliability module. This neutral data base concept allows easy data transfer between different computer systems. The new interface program from the finite-element code Matrix Automated Reduction and Coupling (MARC) also includes the option of using hybrid laminates (a combination of plies of different materials or different layups) and allows for variations in temperature fields throughout the component. In the current version of C/CARES, a subelement technique was implemented, enabling stress gradients within an element to be taken into account. The noninteractive reliability function is now evaluated at each Gaussian integration point instead of using averaging techniques. As a result of the increased number of stress evaluation points, considerable improvements in the accuracy of reliability analyses were realized.

  7. Space and transatmospheric propulsion technology

    NASA Technical Reports Server (NTRS)

    Merkle, Charles; Stangeland, Maynard L.; Brown, James R.; Mccarty, John P.; Povinelli, Louis A.; Northam, G. Burton; Zukoski, Edward E.

    1994-01-01

    This report focuses primarily on Japan's programs in liquid rocket propulsion and propulsion for spaceplane and related transatmospheric areas. It refers briefly to Japan's solid rocket programs and to new supersonic air-breathing propulsion efforts. The panel observed that the Japanese had a carefully thought-out plan, a broad-based program, and an ambitious but achievable schedule for propulsion activity. Japan's overall propulsion program is behind that of the United States at the time of this study, but the Japanese are gaining rapidly. The Japanese are at the forefront in such key areas as advanced materials, enjoying a high level of project continuity and funding. Japan's space program has been evolutionary in nature, while the U.S. program has emphasized revolutionary advances. Projects have typically been smaller in Japan than in the United States, focusing on incremental advances in technology, with an excellent record of applying proven technology to new projects. This evolutionary approach, coupled with an ability to take technology off the shelf from other countries, has resulted in relatively low development costs, rapid progress, and enhanced reliability. Clearly Japan is positioned to be a world leader in space and transatmospheric propulsion technology by the year 2000.

  8. Evaluation of the Transit Reliability Information Program

    DOT National Transportation Integrated Search

    1982-06-01

    This report presents an evaluation of the rail portion of the Transit Reliability Information Program (TRIP), which was designed to collect and analyze equipment reliability data on U.S. transit systems. This assessment was conducted at the end of it...

  9. Investing American Recovery and Reinvestment Act Funds to Advance Capability, Reliability, and Performance in NASA Wind Tunnels

    NASA Technical Reports Server (NTRS)

    Sydnor, Goerge H.

    2010-01-01

    The National Aeronautics and Space Administration's (NASA) Aeronautics Test Program (ATP) is implementing five significant ground-based test facility projects across the nation with funding provided by the American Recovery and Reinvestment Act (ARRA). The projects were selected as the best candidates within the constraints of the ARRA and the strategic plan of ATP. They are a combination of much-needed large scale maintenance, reliability, and system upgrades plus creating new test beds for upcoming research programs. The projects are: 1.) Re-activation of a large compressor to provide a second source for compressed air and vacuum to the Unitary Plan Wind Tunnel at the Ames Research Center (ARC) 2.) Addition of high-altitude ice crystal generation at the Glenn Research Center Propulsion Systems Laboratory Test Cell 3, 3.) New refrigeration system and tunnel heat exchanger for the Icing Research Tunnel at the Glenn Research Center, 4.) Technical viability improvements for the National Transonic Facility at the Langley Research Center, and 5.) Modifications to conduct Environmentally Responsible Aviation and Rotorcraft research at the 14 x 22 Subsonic Tunnel at Langley Research Center. The selection rationale, problem statement, and technical solution summary for each project is given here. The benefits and challenges of the ARRA funded projects are discussed. Indirectly, this opportunity provides the advantages of developing experience in NASA's workforce in large projects and maintaining corporate knowledge in that very unique capability. It is envisioned that improved facilities will attract a larger user base and capabilities that are needed for current and future research efforts will offer revenue growth and future operations stability. Several of the chosen projects will maximize wind tunnel reliability and maintainability by using newer, proven technologies in place of older and obsolete equipment and processes. The projects will meet NASA's goal of integrating more efficient, environmentally safer, and less energy consuming hardware and processes into existing tunnel systems. These include Environmental Protection Agency-approved refrigerants, energy efficient motors, and faster, flexible tunnel data systems.

  10. 28 CFR 70.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Revision of budget and program plans. 70... Revision of budget and program plans. (a) The budget plan is the financial expression of the project or... from budget and program plans, and request prior approvals for budget and program plan revisions, in...

  11. 45 CFR 2543.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Revision of budget and program plans. 2543.25... Revision of budget and program plans. (a) The budget plan is the financial expression of the project or... deviations from budget and program plans, and request prior approvals for budget and program plan revisions...

  12. Reliability of an Automated High-Resolution Manometry Analysis Program across Expert Users, Novice Users, and Speech-Language Pathologists

    ERIC Educational Resources Information Center

    Jones, Corinne A.; Hoffman, Matthew R.; Geng, Zhixian; Abdelhalim, Suzan M.; Jiang, Jack J.; McCulloch, Timothy M.

    2014-01-01

    Purpose: The purpose of this study was to investigate inter- and intrarater reliability among expert users, novice users, and speech-language pathologists with a semiautomated high-resolution manometry analysis program. We hypothesized that all users would have high intrarater reliability and high interrater reliability. Method: Three expert…

  13. Development of a reliable estimation procedure of radioactivity inventory in a BWR plant due to neutron irradiation for decommissioning

    NASA Astrophysics Data System (ADS)

    Tanaka, Ken-ichi; Ueno, Jun

    2017-09-01

    Reliable information of radioactivity inventory resulted from the radiological characterization is important in order to plan decommissioning planning and is also crucial in order to promote decommissioning in effectiveness and in safe. The information is referred to by planning of decommissioning strategy and by an application to regulator. Reliable information of radioactivity inventory can be used to optimize the decommissioning processes. In order to perform the radiological characterization reliably, we improved a procedure of an evaluation of neutron-activated materials for a Boiling Water Reactor (BWR). Neutron-activated materials are calculated with calculation codes and their validity should be verified with measurements. The evaluation of neutron-activated materials can be divided into two processes. One is a distribution calculation of neutron-flux. Another is an activation calculation of materials. The distribution calculation of neutron-flux is performed with neutron transport calculation codes with appropriate cross section library to simulate neutron transport phenomena well. Using the distribution of neutron-flux, we perform distribution calculations of radioactivity concentration. We also estimate a time dependent distribution of radioactivity classification and a radioactive-waste classification. The information obtained from the evaluation is utilized by other tasks in the preparatory tasks to make the decommissioning plan and the activity safe and rational.

  14. Development and Validation of a Questionnaire to Detect Behavior Change in Multiple Advance Care Planning Behaviors

    PubMed Central

    Sudore, Rebecca L.; Stewart, Anita L.; Knight, Sara J.; McMahan, Ryan D.; Feuz, Mariko; Miao, Yinghui; Barnes, Deborah E.

    2013-01-01

    Introduction Advance directives have traditionally been considered the gold standard for advance care planning. However, recent evidence suggests that advance care planning involves a series of multiple discrete behaviors for which people are in varying stages of behavior change. The goal of our study was to develop and validate a survey to measure the full advance care planning process. Methods The Advance Care Planning Engagement Survey assesses “Process Measures” of factors known from Behavior Change Theory to affect behavior (knowledge, contemplation, self-efficacy, and readiness, using 5-point Likert scales) and “Action Measures” (yes/no) of multiple behaviors related to surrogate decision makers, values and quality of life, flexibility for surrogate decision making, and informed decision making. We administered surveys at baseline and 1 week later to 50 diverse, older adults from San Francisco hospitals. Internal consistency reliability of Process Measures was assessed using Cronbach's alpha (only continuous variables) and test-retest reliability of Process and Action Measures was examined using intraclass correlations. For discriminant validity, we compared Process and Action Measure scores between this cohort and 20 healthy college students (mean age 23.2 years, SD 2.7). Results Mean age was 69.3 (SD 10.5) and 42% were non-White. The survey took a mean of 21.4 minutes (±6.2) to administer. The survey had good internal consistency (Process Measures Cronbach's alpha, 0.94) and test-retest reliability (Process Measures intraclass correlation, 0.70; Action Measures, 0.87). Both Process and Action Measure scores were higher in the older than younger group, p<.001. Conclusion A new Advance Care Planning Engagement Survey that measures behavior change (knowledge, contemplation, self-efficacy, and readiness) and multiple advance care planning actions demonstrates good reliability and validity. Further research is needed to assess whether survey scores improve in response to advance care planning interventions and whether scores are associated with receipt of care consistent with one's wishes. PMID:24039772

  15. Effectiveness of different approaches to disseminating traveler information on travel time reliability.

    DOT National Transportation Integrated Search

    2014-01-01

    The second Strategic Highway Research Program (SHRP 2) Reliability program aims to improve trip time reliability by reducing the frequency and effects of events that cause travel times to fluctuate unpredictably. Congestion caused by unreliable, or n...

  16. Basis And Application Of The CARES/LIFE Computer Program

    NASA Technical Reports Server (NTRS)

    Nemeth, Noel N.; Janosik, Lesley A.; Gyekenyesi, John P.; Powers, Lynn M.

    1996-01-01

    Report discusses physical and mathematical basis of Ceramics Analysis and Reliability Evaluation of Structures LIFE prediction (CARES/LIFE) computer program, described in "Program for Evaluation of Reliability of Ceramic Parts" (LEW-16018).

  17. The probability estimation of the electronic lesson implementation taking into account software reliability

    NASA Astrophysics Data System (ADS)

    Gurov, V. V.

    2017-01-01

    Software tools for educational purposes, such as e-lessons, computer-based testing system, from the point of view of reliability, have a number of features. The main ones among them are the need to ensure a sufficiently high probability of their faultless operation for a specified time, as well as the impossibility of their rapid recovery by the way of replacing it with a similar running program during the classes. The article considers the peculiarities of reliability evaluation of programs in contrast to assessments of hardware reliability. The basic requirements to reliability of software used for carrying out practical and laboratory classes in the form of computer-based training programs are given. The essential requirements applicable to the reliability of software used for conducting the practical and laboratory studies in the form of computer-based teaching programs are also described. The mathematical tool based on Markov chains, which allows to determine the degree of debugging of the training program for use in the educational process by means of applying the graph of the software modules interaction, is presented.

  18. Waste management with recourse: an inexact dynamic programming model containing fuzzy boundary intervals in objectives and constraints.

    PubMed

    Tan, Q; Huang, G H; Cai, Y P

    2010-09-01

    The existing inexact optimization methods based on interval-parameter linear programming can hardly address problems where coefficients in objective functions are subject to dual uncertainties. In this study, a superiority-inferiority-based inexact fuzzy two-stage mixed-integer linear programming (SI-IFTMILP) model was developed for supporting municipal solid waste management under uncertainty. The developed SI-IFTMILP approach is capable of tackling dual uncertainties presented as fuzzy boundary intervals (FuBIs) in not only constraints, but also objective functions. Uncertainties expressed as a combination of intervals and random variables could also be explicitly reflected. An algorithm with high computational efficiency was provided to solve SI-IFTMILP. SI-IFTMILP was then applied to a long-term waste management case to demonstrate its applicability. Useful interval solutions were obtained. SI-IFTMILP could help generate dynamic facility-expansion and waste-allocation plans, as well as provide corrective actions when anticipated waste management plans are violated. It could also greatly reduce system-violation risk and enhance system robustness through examining two sets of penalties resulting from variations in fuzziness and randomness. Moreover, four possible alternative models were formulated to solve the same problem; solutions from them were then compared with those from SI-IFTMILP. The results indicate that SI-IFTMILP could provide more reliable solutions than the alternatives. 2010 Elsevier Ltd. All rights reserved.

  19. Software engineering and Ada (Trademark) training: An implementation model for NASA

    NASA Technical Reports Server (NTRS)

    Legrand, Sue; Freedman, Glenn

    1988-01-01

    The choice of Ada for software engineering for projects such as the Space Station has resulted in government and industrial groups considering training programs that help workers become familiar with both a software culture and the intricacies of a new computer language. The questions of how much time it takes to learn software engineering with Ada, how much an organization should invest in such training, and how the training should be structured are considered. Software engineering is an emerging, dynamic discipline. It is defined by the author as the establishment and application of sound engineering environments, tools, methods, models, principles, and concepts combined with appropriate standards, guidelines, and practices to support computing which is correct, modifiable, reliable and safe, efficient, and understandable throughout the life cycle of the application. Neither the training programs needed, nor the content of such programs, have been well established. This study addresses the requirements for training for NASA personnel and recommends an implementation plan. A curriculum and a means of delivery are recommended. It is further suggested that a knowledgeable programmer may be able to learn Ada in 5 days, but that it takes 6 to 9 months to evolve into a software engineer who uses the language correctly and effectively. The curriculum and implementation plan can be adapted for each NASA Center according to the needs dictated by each project.

  20. Nutrition and Other Protective Behaviors Motivated by Environmental Health Risk Awareness.

    PubMed

    Jones, Elizabeth W; Feng, Limin; Dixon, Jane K; Dixon, John P; Hofe, Carolyn R; Gaetke, Lisa M

    2016-01-01

    Research findings have suggested that exposure to environmental pollutants contributes to increased health risks, which may be modulated by certain nutrition and other protective health behaviors. Nutrition professionals play an important role in effectively disseminating this information and in devising specific community-based nutrition education programs for audiences located in areas with environmental health issues. To assess awareness of environmental health problems and motivation to adopt protective health behaviors for use in planning nutrition education programs for communities exposed to environmental pollutants. Data were collected from a modified, validated Environmental Health Engagement Profile (EHEP) survey instrument administered to adults (n=774) participating in community events in Kentucky based on location relative to hazardous waste sites. The modified EHEP survey instrument showed good internal consistency reliability, and demographic characteristics were evaluated. Correlation analyses revealed significant positive correlations in all groups, separately and combined, between awareness of environmental pollution in an individual's surroundings and the extent of concern that pollutants cause adverse health effects (P < 0.01) and between concern that pollutants cause adverse health effects and taking personal actions to protect against such environmental insults (P < 0.01). The groups having the highest level of awareness posed by pollution are those residing near federally designated hazardous waste sites. These results suggest that determining and expanding an audience's knowledge and perceptions of environmental health risks will enhance effective nutrition education program planning.

  1. Improvement of the extravehicular activity suit for the MIR orbiting station program.

    PubMed

    Severin, G; Abramov, I; Svertshek, V; Stoklitsky, A

    1996-09-01

    Since 1977, EVA suits of the semi-rigid type have been used to support sorties from Russian orbiting stations. Currently, within the MIR station program, the Orlan-DMA, the latest modification of the Orlan semi-rigid EVA suit is used by crewmembers. Quite some experience has been gained by Russia in operations of the Orlan type suits. It has proved the advantages of the EVA suit of a semi-rigid configuration, featuring donning/doffing through a hinged backpack door with a built-in life support system. Meanwhile there were some wishes and comments from the crewmembers addressed to the enclosure design and some LSS components. Currently a number of ways and methods are being developed to improve operational characteristics of the suit as well as to enhance its reliability and lifetime. The forthcoming EVAs to be performed by the STS-MIR crewmembers and future EVAs from the common airlock of the International Space Station Alpha make implementation of the planned improvements even more consistent. The paper analyzes the experience gained in the Orlan-DMA operation and discusses planned improvements in light of the forthcoming activities. In particular the Orlan enhancement program is aimed to make the donning/doffing easier, enhance enclosure mobility, improve the condensate removal unit, increase the CCC (Contamination Control Cartridge) operation time and simplify the onboard subsystem design concept.

  2. Resilience of Self-Organised and Top-Down Planned Cities—A Case Study on London and Beijing Street Networks

    PubMed Central

    Wang, Jiaqiu

    2015-01-01

    The success or failure of the street network depends on its reliability. In this article, using resilience analysis, the author studies how the shape and appearance of street networks in self-organised and top-down planned cities influences urban transport. Considering London and Beijing as proxies for self-organised and top-down planned cities, the structural properties of London and Beijing networks first are investigated based on their primal and dual representations of planar graphs. The robustness of street networks then is evaluated in primal space and dual space by deactivating road links under random and intentional attack scenarios. The results show that the reliability of London street network differs from that of Beijing, which seems to rely more on its architecture and connectivity. It is found that top-down planned Beijing with its higher average degree in the dual space and assortativity in the primal space is more robust than self-organised London using the measures of maximum and second largest cluster size and network efficiency. The article offers an insight, from a network perspective, into the reliability of street patterns in self-organised and top-down planned city systems. PMID:26682551

  3. A fuzzy chance-constrained programming model with type 1 and type 2 fuzzy sets for solid waste management under uncertainty

    NASA Astrophysics Data System (ADS)

    Ma, Xiaolin; Ma, Chi; Wan, Zhifang; Wang, Kewei

    2017-06-01

    Effective management of municipal solid waste (MSW) is critical for urban planning and development. This study aims to develop an integrated type 1 and type 2 fuzzy sets chance-constrained programming (ITFCCP) model for tackling regional MSW management problem under a fuzzy environment, where waste generation amounts are supposed to be type 2 fuzzy variables and treated capacities of facilities are assumed to be type 1 fuzzy variables. The evaluation and expression of uncertainty overcome the drawbacks in describing fuzzy possibility distributions as oversimplified forms. The fuzzy constraints are converted to their crisp equivalents through chance-constrained programming under the same or different confidence levels. Regional waste management of the City of Dalian, China, was used as a case study for demonstration. The solutions under various confidence levels reflect the trade-off between system economy and reliability. It is concluded that the ITFCCP model is capable of helping decision makers to generate reasonable waste-allocation alternatives under uncertainties.

  4. An analytic model for footprint dispersions and its application to mission design

    NASA Technical Reports Server (NTRS)

    Rao, J. R. Jagannatha; Chen, Yi-Chao

    1992-01-01

    This is the final report on our recent research activities that are complementary to those conducted by our colleagues, Professor Farrokh Mistree and students, in the context of the Taguchi method. We have studied the mathematical model that forms the basis of the Simulation and Optimization of Rocket Trajectories (SORT) program and developed an analytic method for determining mission reliability with a reduced number of flight simulations. This method can be incorporated in a design algorithm to mathematically optimize different performance measures of a mission, thus leading to a robust and easy-to-use methodology for mission planning and design.

  5. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keith, Raymond E.; Heller, Thomas J.; Bush, Stuart A.

    1991-01-01

    This Annual Report on Colorado-Ute Electric Association's NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration planmore » was completed. (VC)« less

  6. Perceived barriers to completing an e-learning program on evidence-based medicine.

    PubMed

    Gagnon, Marie-Pierre; Légaré, France; Labrecque, Michel; Frémont, Pierre; Cauchon, Michel; Desmartis, Marie

    2007-01-01

    The Continuing Professional Development Center of the Faculty of Medicine at Laval University offers an internet-based program on evidence-based medicine (EBM). After one year, only three physicians out of the 40 who willingly paid to register had completed the entire program. This descriptive study aimed to identify physicians' beliefs regarding their completion of this online program. Using theoretical concepts from the Theory of Planned Behaviour, a semi-structured telephone interview guide was developed to assess respondents' attitudes, perceived subjective norms, perceived obstacles and facilitating conditions with respect to completing this internet-based program. Three independent reviewers performed content analysis of the interview transcripts to obtain an appropriate level of reliability. Findings were shared and organised according to theoretical categories of beliefs. A total of 35 physicians (88% response rate) were interviewed. Despite perceived advantages to completing the internet-based program, barriers remained, especially those related to physicians' perceptions of time constraints. Lack of personal discipline and unfamiliarity with computers were also perceived as important barriers. This study offers a theoretical basis to understand physicians' beliefs towards completing an internet-based continuing medical education (CME) program on EBM. Based upon respondents' insights, several modifications were carried out to enhance the uptake of the program by physicians and, therefore, its implementation.

  7. Analysis of whisker-toughened CMC structural components using an interactive reliability model

    NASA Technical Reports Server (NTRS)

    Duffy, Stephen F.; Palko, Joseph L.

    1992-01-01

    Realizing wider utilization of ceramic matrix composites (CMC) requires the development of advanced structural analysis technologies. This article focuses on the use of interactive reliability models to predict component probability of failure. The deterministic William-Warnke failure criterion serves as theoretical basis for the reliability model presented here. The model has been implemented into a test-bed software program. This computer program has been coupled to a general-purpose finite element program. A simple structural problem is presented to illustrate the reliability model and the computer algorithm.

  8. Apollo experience report: Reliability and quality assurance

    NASA Technical Reports Server (NTRS)

    Sperber, K. P.

    1973-01-01

    The reliability of the Apollo spacecraft resulted from the application of proven reliability and quality techniques and from sound management, engineering, and manufacturing practices. Continual assessment of these techniques and practices was made during the program, and, when deficiencies were detected, adjustments were made and the deficiencies were effectively corrected. The most significant practices, deficiencies, adjustments, and experiences during the Apollo Program are described in this report. These experiences can be helpful in establishing an effective base on which to structure an efficient reliability and quality assurance effort for future space-flight programs.

  9. Center to Advance Palliative Care palliative care clinical care and customer satisfaction metrics consensus recommendations.

    PubMed

    Weissman, David E; Morrison, R Sean; Meier, Diane E

    2010-02-01

    Data collection and analysis are vital for strategic planning, quality improvement, and demonstration of palliative care program impact to hospital administrators, private funders and policymakers. Since 2000, the Center to Advance Palliative Care (CAPC) has provided technical assistance to hospitals, health systems and hospices working to start, sustain, and grow nonhospice palliative care programs. CAPC convened a consensus panel in 2008 to develop recommendations for specific clinical and customer metrics that programs should track. The panel agreed on four key domains of clinical metrics and two domains of customer metrics. Clinical metrics include: daily assessment of physical/psychological/spiritual symptoms by a symptom assessment tool; establishment of patient-centered goals of care; support to patient/family caregivers; and management of transitions across care sites. For customer metrics, consensus was reached on two domains that should be tracked to assess satisfaction: patient/family satisfaction, and referring clinician satisfaction. In an effort to ensure access to reliably high-quality palliative care data throughout the nation, hospital palliative care programs are encouraged to collect and report outcomes for each of the metric domains described here.

  10. NASA's Chemical Transfer Propulsion Program for Pathfinder

    NASA Technical Reports Server (NTRS)

    Hannum, Ned P.; Berkopec, Frank D.; Zurawski, Robert L.

    1989-01-01

    Pathfinder is a research and technology project, with specific deliverables, initiated by the National Aeronautics and Space Administration (NASA) which will strengthen the technology base of the United States civil space program in preparation for future space exploration missions. Pathfinder begins in Fiscal Year 1989, and is to advance a collection of critical technologies for these missions and ensure technology readiness for future national decisions regarding exploration of the solar system. The four major thrusts of Pathfinder are: surface exploration, in-space operations, humans-in-space, and space transfer. The space transfer thrust will provide the critical technologies needed for transportation to, and return from, the Moon, Mars, and other planets in the solar system, as well as for reliable and cost-effective Earth-orbit operations. A key element of this thrust is the Chemical Transfer Propulsion program which will provide the propulsion technology for high performance, liquid oxygen/liquid hydrogen expander cycle engines which may be operated and maintained in space. Described here are the program overview including the goals and objectives, management, technical plan, and technology transfer for the Chemical Transfer Propulsion element of Pathfinder.

  11. 45 CFR 309.35 - What are the procedures for review of a Tribal IV-D program application, plan or plan amendment?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-D program application, plan or plan amendment? 309.35 Section 309.35 Public Welfare Regulations... ENFORCEMENT (IV-D) PROGRAM Tribal IV-D Program Application Procedures § 309.35 What are the procedures for review of a Tribal IV-D program application, plan or plan amendment? (a) The Secretary will promptly...

  12. LANL continuity of operations plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Senutovitch, Diane M

    2010-12-22

    The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratorymore » EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may be required to support an allhazards event, including a national security emergency, major fire, catastrophic natural disaster, man-made disaster, terrorism event, or technological disaster by rendering LANL buildings, infrastructure, or Technical Areas unsafe, temporarily unusable, or inaccessible.« less

  13. 78 FR 5837 - Cancellation of Environmental Impact Statement/Environmental Impact Report on the Sacramento...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ...: The Sacramento River Water Reliability Study (SRWRS) was a water supply plan consistent with the Water... supplies to meet growing water supply demands and reliability objectives in their respective service areas.../Environmental Impact Report on the Sacramento River Water Reliability Study, California AGENCY: Bureau of...

  14. Comprehensive clinical assessment in community setting: applicability of the MDS-HC.

    PubMed

    Morris, J N; Fries, B E; Steel, K; Ikegami, N; Bernabei, R; Carpenter, G I; Gilgen, R; Hirdes, J P; Topinková, E

    1997-08-01

    To describe the results of an international trial of the home care version of the MDS assessment and problem identification system (the MDS-HC), including reliability estimates, a comparison of MDS-HC reliabilities with reliabilities of the same items in the MDS 2.0 nursing home assessment instrument, and an examination of the types of problems found in home care clients using the MDS-HC. Independent, dual assessment of clients of home-care agencies by trained clinicians using a draft of the MDS-HC, with additional descriptive data regarding problem profiles for home care clients. Reliability data from dual assessments of 241 randomly selected clients of home care agencies in five countries, all of whom volunteered to test the MDS-HC. Also included are an expanded sample of 780 home care assessments from these countries and 187 dually assessed residents from 21 nursing homes in the United States. The array of MDS-HC assessment items included measures in the following areas: personal items, cognitive patterns, communication/hearing, vision, mood and behavior, social functioning, informal support services, physical functioning, continence, disease diagnoses health conditions and preventive health measures, nutrition/hydration, dental status, skin condition, environmental assessment, service utilization, and medications. Forty-seven percent of the functional, health status, social environment, and service items in the MDS-HC were taken from the MDS 2.0 for nursing homes. For this item set, it is estimated that the average weighted Kappa is .74 for the MDS-HC and .75 for the MDS 2.0. Similarly, high reliability values were found for items newly introduced in the MDS-HC (weighted Kappa = .70). Descriptive findings also characterize the problems of home care clients, with subanalyses within cognitive performance levels. Findings indicate that the core set of items in the MDS 2.0 work equally well in community and nursing home settings. New items are highly reliable. In tandem, these instruments can be used within the international community, assisting and planning care for older adults within a broad spectrum of service settings, including nursing homes and home care programs. With this community-based, second-generation problem and care plan-driven assessment instrument, disability assessment can be performed consistently across the world.

  15. Development of a questionnaire for assessing factors predicting blood donation among university students: a pilot study.

    PubMed

    Jalalian, Mehrdad; Latiff, Latiffah; Hassan, Syed Tajuddin Syed; Hanachi, Parichehr; Othman, Mohamed

    2010-05-01

    University students are a target group for blood donor programs. To develop a blood donation culture among university students, it is important to identify factors used to predict their intent to donate blood. This study attempted to develop a valid and reliable measurement tool to be employed in assessing variables in a blood donation behavior model based on the Theory of Planned Behavior (TPB), a commonly used theoretical foundation for social psychology studies. We employed an elicitation study, in which we determined the commonly held behavioral and normative beliefs about blood donation. We used the results of the elicitation study and a standard format for creating questionnaire items for all constructs of the TPB model to prepare the first draft of the measurement tool. After piloting the questionnaire, we prepared the final draft of the questionnaire to be used in our main study. Examination of internal consistency using Chronbach's alpha coefficient and item-total statistics indicated the constructs "Intention" and "Self efficacy" had the highest reliability. Removing one item from each of the constructs, "Attitude," "Subjective norm," "Self efficacy," or "Behavioral beliefs", can considerably increase the reliability of the measurement tool, however, such action is controversial, especially for the variables "attitude" and "subjective norm." We consider all the items of our first draft questionnaire in our main study to make it a reliable measurement tool.

  16. Knowledge, attitudes, and practice behaviors of oncology advanced practice nurses regarding advanced care planning for patients with cancer.

    PubMed

    Zhou, Guiyun; Stoltzfus, Jill C; Houldin, Arlene D; Parks, Susan M; Swan, Beth Ann

    2010-11-01

    To establish initial reliability and validity of a Web-based survey focused on oncology advanced practice nurses' (APNs') knowledge, attitudes, and practice behaviors regarding advanced care planning, and to obtain preliminary understanding of APNs' knowledge, attitudes, and practice behaviors and perceived barriers to advanced care planning. Descriptive, cross-sectional, pilot survey study. The eastern United States. 300 oncology APNs. Guided by the Theory of Planned Behavior, a knowledge, attitudes, and practice behaviors survey was developed and reviewed for content validity. The survey was distributed to 300 APNs via e-mail and sent again to the 89 APNs who responded to the initial survey. Exploratory factor analysis was used to examine the construct validity and test-retest reliability of the survey's attitudinal and practice behavior portions. Respondents' demographics, knowledge, attitudes, practice behaviors, and perceived barriers to advanced care planning practice. Exploratory factor analysis yielded a five-factor solution from the survey's attitudes and practice behavior portions with internal consistency using Cronbach alpha. Respondents achieved an average of 67% correct answers in the 12-item knowledge section and scored positively in attitudes toward advanced care planning. Their practice behavior scores were marginally positive. The most common reported barriers were from patients' and families' as well as physicians' reluctance to discuss advanced care planning. The attitudinal and practice behaviors portions of the survey demonstrated preliminary construct validity and test-retest reliability. Regarding advanced care planning, respondents were moderately knowledgeable, but their advanced care planning practice was not routine. Validly assessing oncology APNs' knowledge, attitudes, and practice behaviors regarding advanced care planning will enable more tailored approaches to improve end-of-life care outcomes.

  17. Program Planning in Health Professions Education

    ERIC Educational Resources Information Center

    Schmidt, Steven W.; Lawson, Luan

    2018-01-01

    In this chapter, the major concepts from program planning in adult education will be applied to health professions education (HPE). Curriculum planning and program planning will be differentiated, and program development and planning will be grounded in a systems thinking approach.

  18. Efficacy of a Newly Designed Cephalometric Analysis Software for McNamara Analysis in Comparison with Dolphin Software.

    PubMed

    Nouri, Mahtab; Hamidiaval, Shadi; Akbarzadeh Baghban, Alireza; Basafa, Mohammad; Fahim, Mohammad

    2015-01-01

    Cephalometric norms of McNamara analysis have been studied in various populations due to their optimal efficiency. Dolphin cephalometric software greatly enhances the conduction of this analysis for orthodontic measurements. However, Dolphin is very expensive and cannot be afforded by many clinicians in developing countries. A suitable alternative software program in Farsi/English will greatly help Farsi speaking clinicians. The present study aimed to develop an affordable Iranian cephalometric analysis software program and compare it with Dolphin, the standard software available on the market for cephalometric analysis. In this diagnostic, descriptive study, 150 lateral cephalograms of normal occlusion individuals were selected in Mashhad and Qazvin, two major cities of Iran mainly populated with Fars ethnicity, the main Iranian ethnic group. After tracing the cephalograms, the McNamara analysis standards were measured both with Dolphin and the new software. The cephalometric software was designed using Microsoft Visual C++ program in Windows XP. Measurements made with the new software were compared with those of Dolphin software on both series of cephalograms. The validity and reliability were tested using intra-class correlation coefficient. Calculations showed a very high correlation between the results of the Iranian cephalometric analysis software and Dolphin. This confirms the validity and optimal efficacy of the newly designed software (ICC 0.570-1.0). According to our results, the newly designed software has acceptable validity and reliability and can be used for orthodontic diagnosis, treatment planning and assessment of treatment outcome.

  19. Measuring the impact of diagnostic decision support on the quality of clinical decision making: development of a reliable and valid composite score.

    PubMed

    Ramnarayan, Padmanabhan; Kapoor, Ritika R; Coren, Michael; Nanduri, Vasantha; Tomlinson, Amanda L; Taylor, Paul M; Wyatt, Jeremy C; Britto, Joseph F

    2003-01-01

    Few previous studies evaluating the benefits of diagnostic decision support systems have simultaneously measured changes in diagnostic quality and clinical management prompted by use of the system. This report describes a reliable and valid scoring technique to measure the quality of clinical decision plans in an acute medical setting, where diagnostic decision support tools might prove most useful. Sets of differential diagnoses and clinical management plans generated by 71 clinicians for six simulated cases, before and after decision support from a Web-based pediatric differential diagnostic tool (ISABEL), were used. A composite quality score was calculated separately for each diagnostic and management plan by considering the appropriateness value of each component diagnostic or management suggestion, a weighted sum of individual suggestion ratings, relevance of the entire plan, and its comprehensiveness. The reliability and validity (face, concurrent, construct, and content) of these two final scores were examined. Two hundred fifty-two diagnostic and 350 management suggestions were included in the interrater reliability analysis. There was good agreement between raters (intraclass correlation coefficient, 0.79 for diagnoses, and 0.72 for management). No counterintuitive scores were demonstrated on visual inspection of the sets. Content validity was verified by a consultation process with pediatricians. Both scores discriminated adequately between the plans of consultants and medical students and correlated well with clinicians' subjective opinions of overall plan quality (Spearman rho 0.65, p < 0.01). The diagnostic and management scores for each episode showed moderate correlation (r = 0.51). The scores described can be used as key outcome measures in a larger study to fully assess the value of diagnostic decision aids, such as the ISABEL system.

  20. Shuttle-Derived Launch Vehicles' Capablities: An Overview

    NASA Technical Reports Server (NTRS)

    Rothschild, William J.; Bailey, Debra A.; Henderson, Edward M.; Crumbly, Chris

    2005-01-01

    Shuttle-Derived Launch Vehicle (SDLV) concepts have been developed by a collaborative team comprising the Johnson Space Center, Marshall Space Flight Center, Kennedy Space Center, ATK-Thiokol, Lockheed Martin Space Systems Company, The Boeing Company, and United Space Alliance. The purpose of this study was to provide timely information on a full spectrum of low-risk, cost-effective options for STS-Derived Launch Vehicle concepts to support the definition of crew and cargo launch requirements for the Space Exploration Vision. Since the SDLV options use high-reliability hardware, existing facilities, and proven processes, they can provide relatively low-risk capabilities to launch extremely large payloads to low Earth orbit. This capability to reliably lift very large, high-dollar-value payloads could reduce mission operational risks by minimizing the number of complex on-orbit operations compared to architectures based on multiple smaller launchers. The SDLV options also offer several logical spiral development paths for larger exploration payloads. All of these development paths make practical and cost-effective use of existing Space Shuttle Program (SSP) hardware, infrastructure, and launch and flight operations systems. By utilizing these existing assets, the SDLV project could support the safe and orderly transition of the current SSP through the planned end of life in 2010. The SDLV concept definition work during 2004 focused on three main configuration alternatives: a side-mount heavy lifter (approximately 77 MT payload), an in-line medium lifter (approximately 22 MT Crew Exploration Vehicle payload), and an in-line heavy lifter (greater than 100 MT payload). This paper provides an overview of the configuration, performance capabilities, reliability estimates, concept of operations, and development plans for each of the various SDLV alternatives. While development, production, and operations costs have been estimated for each of the SDLV configuration alternatives, these proprietary data have not been included in this paper.

  1. Monolithic ceramic analysis using the SCARE program

    NASA Technical Reports Server (NTRS)

    Manderscheid, Jane M.

    1988-01-01

    The Structural Ceramics Analysis and Reliability Evaluation (SCARE) computer program calculates the fast fracture reliability of monolithic ceramic components. The code is a post-processor to the MSC/NASTRAN general purpose finite element program. The SCARE program automatically accepts the MSC/NASTRAN output necessary to compute reliability. This includes element stresses, temperatures, volumes, and areas. The SCARE program computes two-parameter Weibull strength distributions from input fracture data for both volume and surface flaws. The distributions can then be used to calculate the reliability of geometrically complex components subjected to multiaxial stress states. Several fracture criteria and flaw types are available for selection by the user, including out-of-plane crack extension theories. The theoretical basis for the reliability calculations was proposed by Batdorf. These models combine linear elastic fracture mechanics (LEFM) with Weibull statistics to provide a mechanistic failure criterion. Other fracture theories included in SCARE are the normal stress averaging technique and the principle of independent action. The objective of this presentation is to summarize these theories, including their limitations and advantages, and to provide a general description of the SCARE program, along with example problems.

  2. CARES/LIFE Ceramics Analysis and Reliability Evaluation of Structures Life Prediction Program

    NASA Technical Reports Server (NTRS)

    Nemeth, Noel N.; Powers, Lynn M.; Janosik, Lesley A.; Gyekenyesi, John P.

    2003-01-01

    This manual describes the Ceramics Analysis and Reliability Evaluation of Structures Life Prediction (CARES/LIFE) computer program. The program calculates the time-dependent reliability of monolithic ceramic components subjected to thermomechanical and/or proof test loading. CARES/LIFE is an extension of the CARES (Ceramic Analysis and Reliability Evaluation of Structures) computer program. The program uses results from MSC/NASTRAN, ABAQUS, and ANSYS finite element analysis programs to evaluate component reliability due to inherent surface and/or volume type flaws. CARES/LIFE accounts for the phenomenon of subcritical crack growth (SCG) by utilizing the power law, Paris law, or Walker law. The two-parameter Weibull cumulative distribution function is used to characterize the variation in component strength. The effects of multiaxial stresses are modeled by using either the principle of independent action (PIA), the Weibull normal stress averaging method (NSA), or the Batdorf theory. Inert strength and fatigue parameters are estimated from rupture strength data of naturally flawed specimens loaded in static, dynamic, or cyclic fatigue. The probabilistic time-dependent theories used in CARES/LIFE, along with the input and output for CARES/LIFE, are described. Example problems to demonstrate various features of the program are also included.

  3. Problematics of Reliability of Road Rollers

    NASA Astrophysics Data System (ADS)

    Stawowiak, Michał; Kuczaj, Mariusz

    2018-06-01

    This article refers to the reliability of road rollers used in a selected roadworks company. Information on the method of road rollers service and how the service affects the reliability of these rollers is presented. Attention was paid to the process of the implemented maintenance plan with regard to the machine's operational time. The reliability of road rollers was analyzed by determining and interpreting readiness coefficients.

  4. Design for reliability: NASA reliability preferred practices for design and test

    NASA Technical Reports Server (NTRS)

    Lalli, Vincent R.

    1994-01-01

    This tutorial summarizes reliability experience from both NASA and industry and reflects engineering practices that support current and future civil space programs. These practices were collected from various NASA field centers and were reviewed by a committee of senior technical representatives from the participating centers (members are listed at the end). The material for this tutorial was taken from the publication issued by the NASA Reliability and Maintainability Steering Committee (NASA Reliability Preferred Practices for Design and Test. NASA TM-4322, 1991). Reliability must be an integral part of the systems engineering process. Although both disciplines must be weighed equally with other technical and programmatic demands, the application of sound reliability principles will be the key to the effectiveness and affordability of America's space program. Our space programs have shown that reliability efforts must focus on the design characteristics that affect the frequency of failure. Herein, we emphasize that these identified design characteristics must be controlled by applying conservative engineering principles.

  5. Reliability demonstration test for load-sharing systems with exponential and Weibull components

    PubMed Central

    Hu, Qingpei; Yu, Dan; Xie, Min

    2017-01-01

    Conducting a Reliability Demonstration Test (RDT) is a crucial step in production. Products are tested under certain schemes to demonstrate whether their reliability indices reach pre-specified thresholds. Test schemes for RDT have been studied in different situations, e.g., lifetime testing, degradation testing and accelerated testing. Systems designed with several structures are also investigated in many RDT plans. Despite the availability of a range of test plans for different systems, RDT planning for load-sharing systems hasn’t yet received the attention it deserves. In this paper, we propose a demonstration method for two specific types of load-sharing systems with components subject to two distributions: exponential and Weibull. Based on the assumptions and interpretations made in several previous works on such load-sharing systems, we set the mean time to failure (MTTF) of the total system as the demonstration target. We represent the MTTF as a summation of mean time between successive component failures. Next, we introduce generalized test statistics for both the underlying distributions. Finally, RDT plans for the two types of systems are established on the basis of these test statistics. PMID:29284030

  6. Reliability demonstration test for load-sharing systems with exponential and Weibull components.

    PubMed

    Xu, Jianyu; Hu, Qingpei; Yu, Dan; Xie, Min

    2017-01-01

    Conducting a Reliability Demonstration Test (RDT) is a crucial step in production. Products are tested under certain schemes to demonstrate whether their reliability indices reach pre-specified thresholds. Test schemes for RDT have been studied in different situations, e.g., lifetime testing, degradation testing and accelerated testing. Systems designed with several structures are also investigated in many RDT plans. Despite the availability of a range of test plans for different systems, RDT planning for load-sharing systems hasn't yet received the attention it deserves. In this paper, we propose a demonstration method for two specific types of load-sharing systems with components subject to two distributions: exponential and Weibull. Based on the assumptions and interpretations made in several previous works on such load-sharing systems, we set the mean time to failure (MTTF) of the total system as the demonstration target. We represent the MTTF as a summation of mean time between successive component failures. Next, we introduce generalized test statistics for both the underlying distributions. Finally, RDT plans for the two types of systems are established on the basis of these test statistics.

  7. The ACTIVATE study: results from a group-randomized controlled trial comparing a traditional worksite health promotion program with an activated consumer program.

    PubMed

    Terry, Paul E; Fowles, Jinnet Briggs; Xi, Min; Harvey, Lisa

    2011-01-01

    PURPOSE. This study compares a traditional worksite-based health promotion program with an activated consumer program and a control program DESIGN. Group randomized controlled trial with 18-month intervention. SETTING. Two large Midwestern companies. SUBJECTS. Three hundred and twenty employees (51% response). INTERVENTION. The traditional health promotion intervention offered population-level campaigns on physical activity, nutrition, and stress management. The activated consumer intervention included population-level campaigns for evaluating health information, choosing a health benefits plan, and understanding the risks of not taking medications as prescribed. The personal development intervention (control group) offered information on hobbies. The interventions also offered individual-level coaching for high risk individuals in both active intervention groups. MEASURES. Health risk status, general health status, consumer activation, productivity, and the ability to evaluate health information. ANALYSIS. Multivariate analyses controlled for baseline differences among the study groups. RESULTS. At the population level, compared with baseline performance, the traditional health promotion intervention improved health risk status, consumer activation, and the ability to recognize reliable health websites. Compared with baseline performance, the activated consumer intervention improved consumer activation, productivity, and the ability to recognize reliable health websites. At the population level, however, only the activated consumer intervention improved any outcome more than the control group did; that outcome was consumer activation. At the individual level for high risk individuals, both traditional health coaching and activated consumer coaching positively affected health risk status and consumer activation. In addition, both coaching interventions improved participant ability to recognize a reliable health website. Consumer activation coaching also significantly improved self-reported productivity. CONCLUSION. An effective intervention can change employee health risk status and activation both at the population level and at the individual high risk level. However, program engagement at the population level was low, indicating that additional promotional strategies, such as greater use of incentives, need to be examined. Less intensive coaching can be as effective as more intensive, albeit both interventions produced modest behavior change and retention in the consumer activation arm was most difficult. Further research is needed concerning recruitment and retention methods that will enable populations to realize the full potential of activated consumerism.

  8. Software reliability models for critical applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pham, H.; Pham, M.

    This report presents the results of the first phase of the ongoing EG G Idaho, Inc. Software Reliability Research Program. The program is studying the existing software reliability models and proposes a state-of-the-art software reliability model that is relevant to the nuclear reactor control environment. This report consists of three parts: (1) summaries of the literature review of existing software reliability and fault tolerant software reliability models and their related issues, (2) proposed technique for software reliability enhancement, and (3) general discussion and future research. The development of this proposed state-of-the-art software reliability model will be performed in the secondmore » place. 407 refs., 4 figs., 2 tabs.« less

  9. Software reliability models for critical applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pham, H.; Pham, M.

    This report presents the results of the first phase of the ongoing EG&G Idaho, Inc. Software Reliability Research Program. The program is studying the existing software reliability models and proposes a state-of-the-art software reliability model that is relevant to the nuclear reactor control environment. This report consists of three parts: (1) summaries of the literature review of existing software reliability and fault tolerant software reliability models and their related issues, (2) proposed technique for software reliability enhancement, and (3) general discussion and future research. The development of this proposed state-of-the-art software reliability model will be performed in the second place.more » 407 refs., 4 figs., 2 tabs.« less

  10. Measuring trainer fidelity in the transfer of suicide prevention training

    PubMed Central

    Cross, Wendi F.; Pisani, Anthony R.; Schmeelk-Cone, Karen; Xia, Yinglin; Tu, Xin; McMahon, Marcie; Munfakh, Jimmie Lou; Gould, Madelyn S.

    2014-01-01

    Background Finding effective and efficient models to train large numbers of suicide prevention interventionists, including ‘hotline’ crisis counselors, is a high priority. Train-the-trainer (TTT) models are widely used but understudied. Aims To assess the extent to which trainers following TTT delivered the Applied Suicide Intervention Skills Training (ASIST) program with fidelity, and to examine fidelity across two trainings and seven training segments. Methods We recorded and reliably rated trainer fidelity, defined as adherence to program content and competence of program delivery, for 34 newly trained ASIST trainers delivering the program to crisis center staff on two separate occasions. A total of 324 observations were coded. Trainer demographics were also collected. Results On average, trainers delivered two-thirds of the program. Previous training was associated with lower levels of trainer adherence to the program. 18% of trainers' observations were rated as solidly competent. Trainers did not improve fidelity from their first to second training. Significantly higher fidelity was found for lectures and lower fidelity was found for interactive training activities including asking about suicide and creating a safe plan. Conclusions We found wide variability in trainer fidelity to the ASIST program following TTT and few trainers had high levels of both adherence and competence. More research is needed to examine the cost-effectiveness of TTT models. PMID:24901061

  11. General Monte Carlo reliability simulation code including common mode failures and HARP fault/error-handling

    NASA Technical Reports Server (NTRS)

    Platt, M. E.; Lewis, E. E.; Boehm, F.

    1991-01-01

    A Monte Carlo Fortran computer program was developed that uses two variance reduction techniques for computing system reliability applicable to solving very large highly reliable fault-tolerant systems. The program is consistent with the hybrid automated reliability predictor (HARP) code which employs behavioral decomposition and complex fault-error handling models. This new capability is called MC-HARP which efficiently solves reliability models with non-constant failures rates (Weibull). Common mode failure modeling is also a specialty.

  12. 20 CFR 632.255 - Program planning.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... that may be characterized as planning and design but not program operation. (c) Expenses incurred in... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program planning. 632.255 Section 632.255... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a...

  13. An Assessment Model for Energy Efficiency Program Planning in Electric Utilities: Case of the Pacific of Northwest U.S.A

    NASA Astrophysics Data System (ADS)

    Iskin, Ibrahim

    Energy efficiency stands out with its potential to address a number of challenges that today's electric utilities face, including increasing and changing electricity demand, shrinking operating capacity, and decreasing system reliability and flexibility. Being the least cost and least risky alternative, the share of energy efficiency programs in utilities' energy portfolios has been on the rise since the 1980s, and their increasing importance is expected to continue in the future. Despite holding great promise, the ability to determine and invest in only the most promising program alternatives plays a key role in the successful use of energy efficiency as a utility-wide resource. This issue becomes even more significant considering the availability of a vast number of potential energy efficiency programs, the rapidly changing business environment, and the existence of multiple stakeholders. This dissertation introduces hierarchical decision modeling as the framework for energy efficiency program planning in electric utilities. The model focuses on the assessment of emerging energy efficiency programs and proposes to bridge the gap between technology screening and cost/benefit evaluation practices. This approach is expected to identify emerging technology alternatives which have the highest potential to pass cost/benefit ratio testing procedures and contribute to the effectiveness of decision practices in energy efficiency program planning. The model also incorporates rank order analysis and sensitivity analysis for testing the robustness of results from different stakeholder perspectives and future uncertainties in an attempt to enable more informed decision-making practices. The model was applied to the case of 13 high priority emerging energy efficiency program alternatives identified in the Pacific Northwest, U.S.A. The results of this study reveal that energy savings potential is the most important program management consideration in selecting emerging energy efficiency programs. Market dissemination potential and program development and implementation potential are the second and third most important, whereas ancillary benefits potential is the least important program management consideration. The results imply that program value considerations, comprised of energy savings potential and ancillary benefits potential; and program feasibility considerations, comprised of program development and implementation potential and market dissemination potential, have almost equal impacts on assessment of emerging energy efficiency programs. Considering the overwhelming number of value-focused studies and the few feasibility-focused studies in the literature, this finding clearly shows that feasibility-focused studies are greatly understudied. The hierarchical decision model developed in this dissertation is generalizable. Thus, other utilities or power systems can adopt the research steps employed in this study as guidelines and conduct similar assessment studies on emerging energy efficiency programs of their interest.

  14. 34 CFR 74.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Revision of budget and program plans. 74.25 Section 74... Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan...) Recipients are required to report deviations from budget and program plans, and request prior approvals for...

  15. Automation of reliability evaluation procedures through CARE - The computer-aided reliability estimation program.

    NASA Technical Reports Server (NTRS)

    Mathur, F. P.

    1972-01-01

    Description of an on-line interactive computer program called CARE (Computer-Aided Reliability Estimation) which can model self-repair and fault-tolerant organizations and perform certain other functions. Essentially CARE consists of a repository of mathematical equations defining the various basic redundancy schemes. These equations, under program control, are then interrelated to generate the desired mathematical model to fit the architecture of the system under evaluation. The mathematical model is then supplied with ground instances of its variables and is then evaluated to generate values for the reliability-theoretic functions applied to the model.

  16. Gear noise, vibration, and diagnostic studies at NASA Lewis Research Center

    NASA Technical Reports Server (NTRS)

    Zakrajsek, James J.; Oswald, Fred B.; Townsend, Dennis P.; Coy, John J.

    1990-01-01

    The NASA Lewis Research Center and the U.S. Army Aviation Systems Command are involved in a joint research program to advance the technology of rotorcraft transmissions. This program consists of analytical as well as experimental efforts to achieve the overall goals of reducing weight, noise, and vibration, while increasing life and reliability. Recent analytical activities are highlighted in the areas of gear noise, vibration, and diagnostics performed in-house and through NASA and U.S. Army sponsored grants and contracts. These activities include studies of gear tooth profiles to reduce transmission error and vibration as well as gear housing and rotordynamic modeling to reduce structural vibration transmission and noise radiation, and basic research into current gear failure diagnostic methodologies. Results of these activities are presented along with an overview of near term research plans in the gear noise, vibration, and diagnostics area.

  17. A queuing-theory-based interval-fuzzy robust two-stage programming model for environmental management under uncertainty

    NASA Astrophysics Data System (ADS)

    Sun, Y.; Li, Y. P.; Huang, G. H.

    2012-06-01

    In this study, a queuing-theory-based interval-fuzzy robust two-stage programming (QB-IRTP) model is developed through introducing queuing theory into an interval-fuzzy robust two-stage (IRTP) optimization framework. The developed QB-IRTP model can not only address highly uncertain information for the lower and upper bounds of interval parameters but also be used for analysing a variety of policy scenarios that are associated with different levels of economic penalties when the promised targets are violated. Moreover, it can reflect uncertainties in queuing theory problems. The developed method has been applied to a case of long-term municipal solid waste (MSW) management planning. Interval solutions associated with different waste-generation rates, different waiting costs and different arriving rates have been obtained. They can be used for generating decision alternatives and thus help managers to identify desired MSW management policies under various economic objectives and system reliability constraints.

  18. An expert system executive for automated assembly of large space truss structures

    NASA Technical Reports Server (NTRS)

    Allen, Cheryl L.

    1993-01-01

    Langley Research Center developed a unique test bed for investigating the practical problems associated with the assembly of large space truss structures using robotic manipulators. The test bed is the result of an interdisciplinary effort that encompasses the full spectrum of assembly problems - from the design of mechanisms to the development of software. The automated structures assembly test bed and its operation are described, the expert system executive and its development are detailed, and the planned system evolution is discussed. Emphasis is on the expert system implementation of the program executive. The executive program must direct and reliably perform complex assembly tasks with the flexibility to recover from realistic system errors. The employment of an expert system permits information that pertains to the operation of the system to be encapsulated concisely within a knowledge base. This consolidation substantially reduced code, increased flexibility, eased software upgrades, and realized a savings in software maintenance costs.

  19. Cryogenic Control System Migration and Developments towards the UNICOS CERN Standard at INFN

    NASA Astrophysics Data System (ADS)

    Modanese, Paolo; Calore, Andrea; Contran, Tiziano; Friso, Alessandro; Pengo, Marco; Canella, Stefania; Burioli, Sergio; Gallese, Benedetto; Inglese, Vitaliano; Pezzetti, Marco; Pengo, Ruggero

    The cryogenic control systems at Laboratori Nazionali di Legnaro (LNL) are undergoing an important and radical modernization, allowing all the plants controls and supervision systems to be renewed in a homogeneous way towards the CERN-UNICOS standard. Before the UNICOS migration project started there were as many as 7 different types of PLC and 7 different types of SCADA, each one requiring its own particular programming language. In these conditions, even a simple modification and/or integration on the program or on the supervision, required the intervention of a system integrator company, specialized in its specific control system. Furthermore it implied that the operators have to be trained to learn the different types of control systems. The CERN-UNICOS invented for LHC [1] has been chosen due to its reliability and planned to run and be maintained for decades on. The complete migration is part of an agreement between CERN and INFN.

  20. 76 FR 58716 - Interpretation of Transmission Planning Reliability Standard

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... directs NERC and Commission staff to initiate a process to identify any reliability issues, as discussed... Commission directs NERC and Commission staff to initiate a process to identify any reliability issues, as... established a process to select and certify an ERO,\\5\\ and subsequently certified NERC.\\6\\ On April 4, 2006...

  1. Establishment of a National Wind Energy Center at University of Houston

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Su Su

    The DOE-supported project objectives are to: establish a national wind energy center (NWEC) at University of Houston and conduct research to address critical science and engineering issues for the development of future large MW-scale wind energy production systems, especially offshore wind turbines. The goals of the project are to: (1) establish a sound scientific/technical knowledge base of solutions to critical science and engineering issues for developing future MW-scale large wind energy production systems, (2) develop a state-of-the-art wind rotor blade research facility at the University of Houston, and (3) through multi-disciplinary research, introducing technology innovations on advanced wind-turbine materials, processing/manufacturingmore » technology, design and simulation, testing and reliability assessment methods related to future wind turbine systems for cost-effective production of offshore wind energy. To achieve the goals of the project, the following technical tasks were planned and executed during the period from April 15, 2010 to October 31, 2014 at the University of Houston: (1) Basic research on large offshore wind turbine systems (2) Applied research on innovative wind turbine rotors for large offshore wind energy systems (3) Integration of offshore wind-turbine design, advanced materials and manufacturing technologies (4) Integrity and reliability of large offshore wind turbine blades and scaled model testing (5) Education and training of graduate and undergraduate students and post- doctoral researchers (6) Development of a national offshore wind turbine blade research facility The research program addresses both basic science and engineering of current and future large wind turbine systems, especially offshore wind turbines, for MW-scale power generation. The results of the research advance current understanding of many important scientific issues and provide technical information for solving future large wind turbines with advanced design, composite materials, integrated manufacturing, and structural reliability and integrity. The educational program have trained many graduate and undergraduate students and post-doctoral level researchers to learn critical science and engineering of wind energy production systems through graduate-level courses and research, and participating in various projects in center’s large multi-disciplinary research. These students and researchers are now employed by the wind industry, national labs and universities to support the US and international wind energy industry. The national offshore wind turbine blade research facility developed in the project has been used to support the technical and training tasks planned in the program to accomplish their goals, and it is a national asset which is available for used by domestic and international researchers in the wind energy arena.« less

  2. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.« less

  3. Ceramic component reliability with the restructured NASA/CARES computer program

    NASA Technical Reports Server (NTRS)

    Powers, Lynn M.; Starlinger, Alois; Gyekenyesi, John P.

    1992-01-01

    The Ceramics Analysis and Reliability Evaluation of Structures (CARES) integrated design program on statistical fast fracture reliability and monolithic ceramic components is enhanced to include the use of a neutral data base, two-dimensional modeling, and variable problem size. The data base allows for the efficient transfer of element stresses, temperatures, and volumes/areas from the finite element output to the reliability analysis program. Elements are divided to insure a direct correspondence between the subelements and the Gaussian integration points. Two-dimensional modeling is accomplished by assessing the volume flaw reliability with shell elements. To demonstrate the improvements in the algorithm, example problems are selected from a round-robin conducted by WELFEP (WEakest Link failure probability prediction by Finite Element Postprocessors).

  4. An adequacy-constrained integrated planning method for effective accommodation of DG and electric vehicles in smart distribution systems

    NASA Astrophysics Data System (ADS)

    Tan, Zhukui; Xie, Baiming; Zhao, Yuanliang; Dou, Jinyue; Yan, Tong; Liu, Bin; Zeng, Ming

    2018-06-01

    This paper presents a new integrated planning framework for effective accommodating electric vehicles in smart distribution systems (SDS). The proposed method incorporates various investment options available for the utility collectively, including distributed generation (DG), capacitors and network reinforcement. Using a back-propagation algorithm combined with cost-benefit analysis, the optimal network upgrade plan, allocation and sizing of the selected components are determined, with the purpose of minimizing the total system capital and operating costs of DG and EV accommodation. Furthermore, a new iterative reliability test method is proposed. It can check the optimization results by subsequently simulating the reliability level of the planning scheme, and modify the generation reserve margin to guarantee acceptable adequacy levels for each year of the planning horizon. Numerical results based on a 32-bus distribution system verify the effectiveness of the proposed method.

  5. Program planning for the community teaching hospital medical library.

    PubMed Central

    McCorkel, J; Cook, V

    1985-01-01

    To respond to the increasing demand for information from medical educators and clinicians and to persuade administrators to purchase the newly available microcomputer library systems, medical librarians in community teaching hospitals may find it useful to engage in intermediate term (for example, five-year) program planning. To increase the probability that the plan which emerges will be implemented, the planning process should fit the organizational nexus. Planning involves needs assessment, prioritized program elements, a written plan, and facilities planning (if applicable), which lead to program implementation. Components of a model program plan are presented. PMID:4027443

  6. Guidelines for quality assurance and quality control of fish taxonomic data collected as part of the National Water-Quality Assessment Program

    USGS Publications Warehouse

    Walsh, Stephen Joseph; Meador, Michael R.

    1998-01-01

    Fish community structure is characterized by the U.S. Geological Survey's National Water-Quality Assessment (NAWQA) Program as part of a perennial, multidisciplinary approach to evaluating the physical, chemical, and biological conditions of the Nation's water resources. The objective of quality assurance and quality control of fish taxonomic data that are collected as part of the NAWQA Program is to establish uniform guidelines and protocols for the identification, processing, and archiving of fish specimens to ensure that accurate and reliable data are collected. Study unit biologists, collaborating with regional biologists and fish taxonomic specialists, prepare a pre-sampling study plan that includes a preliminary faunal list and identification of an ichthyological curation center for receiving preserved fish specimens. Problematic taxonomic issues and protected taxa also are identified in the study plan, and collecting permits are obtained in advance of sampling activities. Taxonomic specialists are selected to identify fish specimens in the field and to assist in determining what fish specimens should be sacrificed, fixed, and preserved for laboratory identification, independent taxonomic verification, and long-term storage in reference or voucher collections. Quantitative and qualitative sampling of fishes follows standard methods previously established for the NAWQA Program. Common ichthyological techniques are used to process samples in the field and prepare fish specimens to be returned to the laboratory or sent to an institutional repository. Taxonomic identifications are reported by using a standardized list of scientific names that provides nomenclatural consistency and uniformity across study units.

  7. Consensus training: an effective tool to minimize variations in periodontal diagnosis and treatment planning among dental faculty and students.

    PubMed

    John, Vanchit; Lee, Seung-Jun; Prakasam, Sivaraman; Eckert, George J; Maupome, Gerardo

    2013-08-01

    Considerable disagreements and variations exist in diagnosis and treatment planning of periodontal disease. Achieving high interrater periodontal diagnosis can prove challenging. The objectives of this study were to measure variations in periodontal diagnosis and treatment planning among predoctoral periodontics faculty members after consensus training and to compare such variation with those identified in third- and fourth-year dental students. Nine electronically stored case vignettes and survey instruments were made available to eighteen faculty members and twenty dental students under standardized conditions. A chi-square test was used to compare responses between groups, and multirater kappa tests were used to evaluate interrater agreement/reliability. Of the nine cases, only one differed between groups significantly in terms of treatment. Also, third-year students differed from fourth-year students on the diagnosis of aggressive periodontitis versus chronic periodontitis. Most respondents were able to distinguish clearly among diagnoses of chronic periodontitis, aggressive periodontitis, and gingivitis. This study established a baseline assessment of the current status of consensus after training. We will reassess variations after addressing the specific challenges identified. Programs designed and implemented to help decrease the variation in periodontal diagnosis and treatment planning among faculty members may ultimately translate into better agreement and better standardization of dental instruction.

  8. Effect of strategic planning education on attitudes and perceptions of independent community pharmacy owners/managers.

    PubMed

    Harrison, Donald L

    2007-01-01

    To assess the impact of formal education program participation on the attitudes and perceptions of independent community pharmacy owners/managers toward strategic planning. Cross-sectional study. United States; June 4-July 30, 2004. Nationwide random sample of 1,250 owners/managers of independent community pharmacies. Mailed survey. Strategic planning formal education program participation. Comprehensiveness of strategic planning. Attitudes and perceptions of owners/managers of independent community pharmacies toward strategic planning. A total of 527 (42.1%) usable questionnaires were returned. Only 124 (23.5%) respondents indicated that they participated in a formal strategic planning education program. However, of the 141 (26.85%) respondents who indicated that they had conducted strategic planning for their community pharmacy, 111 (89.5%) had participated in a formal strategic planning education program. A significant association was detected between formal education program participation and the conducting of strategic planning (P< or =0.0001). Significant differences were observed for all attitudes and perceptions of independent community pharmacy owners/managers toward strategic planning based on program participation (P< or =0.0001). Finally, respondents who indicated that they had participated in a formal education program had a significantly higher comprehensiveness of strategic planning rating than those respondents who did not participate in an educational program (P< or =0.0001). A significant association exists between formal strategic planning education program participation and the conducting of strategic planning by owner/managers of independent community pharmacies, and those participating in such programs have significantly different attitudes and perceptions toward the conducting of strategic planning and have a significantly higher comprehensiveness of strategic planning rating.

  9. Summary of NASA Aerospace Flight Battery Systems Program activities

    NASA Technical Reports Server (NTRS)

    Manzo, Michelle; Odonnell, Patricia

    1994-01-01

    A summary of NASA Aerospace Flight Battery Systems Program Activities is presented. The NASA Aerospace Flight Battery Systems Program represents a unified NASA wide effort with the overall objective of providing NASA with the policy and posture which will increase the safety, performance, and reliability of space power systems. The specific objectives of the program are to: enhance cell/battery safety and reliability; maintain current battery technology; increase fundamental understanding of primary and secondary cells; provide a means to bring forth advanced technology for flight use; assist flight programs in minimizing battery technology related flight risks; and ensure that safe, reliable batteries are available for NASA's future missions.

  10. Quality-assurance and data management plan for groundwater activities by the U.S. Geological Survey in Kansas, 2014

    USGS Publications Warehouse

    Putnam, James E.; Hansen, Cristi V.

    2014-01-01

    As the Nation’s principle earth-science information agency, the U.S. Geological Survey (USGS) is depended on to collect data of the highest quality. This document is a quality-assurance plan for groundwater activities (GWQAP) of the Kansas Water Science Center. The purpose of this GWQAP is to establish a minimum set of guidelines and practices to be used by the Kansas Water Science Center to ensure quality in groundwater activities. Included within these practices are the assignment of responsibilities for implementing quality-assurance activities in the Kansas Water Science Center and establishment of review procedures needed to ensure the technical quality and reliability of the groundwater products. In addition, this GWQAP is intended to complement quality-assurance plans for surface-water and water-quality activities and similar plans for the Kansas Water Science Center and general project activities throughout the USGS. This document provides the framework for collecting, analyzing, and reporting groundwater data that are quality assured and quality controlled. This GWQAP presents policies directing the collection, processing, analysis, storage, review, and publication of groundwater data. In addition, policies related to organizational responsibilities, training, project planning, and safety are presented. These policies and practices pertain to all groundwater activities conducted by the Kansas Water Science Center, including data-collection programs, interpretive and research projects. This report also includes the data management plan that describes the progression of data management from data collection to archiving and publication.

  11. Sampling Plans for the Thrips Frankliniella schultzei (Thysanoptera: Thripidae) in Three Lettuce Varieties.

    PubMed

    Silva, Alisson R; Rodrigues-Silva, Nilson; Pereira, Poliana S; Sarmento, Renato A; Costa, Thiago L; Galdino, Tarcísio V S; Picanço, Marcelo C

    2017-12-05

    The common blossom thrips, Frankliniella schultzei Trybom (Thysanoptera: Thripidae), is an important lettuce pest worldwide. Conventional sampling plans are the first step in implementing decision-making systems into integrated pest management programs. However, this tool is not available for F. schultzei infesting lettuce crops. Thus, the objective of this work was to develop a conventional sampling plan for F. schultzei in lettuce crops. Two sampling techniques (direct counting and leaf beating on a white plastic tray) were compared in crisphead, looseleaf, and Boston lettuce varieties before and during head formation. The frequency distributions of F. schultzei densities in lettuce crops were assessed, and the number of samples required to compose the sampling plan was determined. Leaf beating on a white plastic tray was the best sampling technique. F. schultzei densities obtained with this technique were fitted to the negative binomial distribution with a common aggregation parameter (common K = 0.3143). The developed sampling plan is composed of 91 samples per field and presents low errors in its estimates (up to 20%), fast execution time (up to 47 min), and low cost (up to US $1.67 per sampling area). This sampling plan can be used as a tool for integrated pest management in lettuce crops, assisting with reliable decision making in different lettuce varieties before and during head formation. © The Author(s) 2017. Published by Oxford University Press on behalf of Entomological Society of America. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  12. Reliability of implant placement after virtual planning of implant positions using cone beam CT data and surgical (guide) templates.

    PubMed

    Nickenig, Hans-Joachim; Eitner, Stephan

    2007-01-01

    We assessed the reliability of implant placement after virtual planning of implant positions using cone-beam CT data and surgical guide templates. A total of 102 patients (250 implants, 55.4% mandibular; mean patient age, 40.4 years) who had undergone implant treatment therapy in an armed forces dental clinic (Cologne, Germany) between July 1, 2005 and December 1, 2005. They were treated with a system that allows transfer of virtual planning to surgical guide templates. Only in eight cases the surgical guides were not used because a delayed implant placement was necessary. In four posterior mandibular cases, handling was limited because of reduced interocclusal distance, requiring 50% shortening of the drill guides. The predictability of implant size was high: only one implant was changed to a smaller diameter (because of insufficient bone). In all cases, critical anatomical structures were protected and no complications were detected in postoperative panoramic radiographs. In 58.1% (147) of the 250 implants, a flapless surgery plan was realized. Implant placement after virtual planning of implant positions using cone beam CT data and surgical templates can be reliable for preoperative assessment of implant size, position, and anatomical complications. It is also indicative of cases amenable to flapless surgery.

  13. Evaluation of urology residents' perception of surgical theater educational environment.

    PubMed

    Binsaleh, Saleh; Babaeer, Abdulrahman; Rabah, Danny; Madbouly, Khaled

    2015-01-01

    To evaluate surgical theater learning environment perception in urology residents in Saudi Arabia and to investigate association of learning environment perception and stages of residency program, sectors of health care system, and regions of Saudi Arabia. A cross-sectional survey using the surgical theater educational environment measure (STEEM) inventory. The STEEM inventory was used to measure theater learning environment perception of urology residents in Saudi Arabia. Respondents' perception was compared regarding different residency stages, sectors of the health care system, and regions of Saudi Arabia. Internal reliability of the inventory was assessed using the Cronbach α coefficient. Correlation analysis was done using the Spearman ρ coefficient. Of 72 registered residents, 33 (45.8%) completed the questionnaire. The residents perceived their environment less than acceptable (135.9 ± 16.7, 67.95%). No significant differences in perception were found among residents of different program stages, different sectors of health care system, or different regions in Saudi Arabia. Residents from the eastern region perceived the training and teaching domain better (p = 0.025). The inventory showed a high internal consistency with a Cronbach α of 0.862. STEEM survey is an applicable and reliable instrument for assessing the learning environment and training skills of urology residency program in Saudi Arabia. Urology residents in Saudi Arabia perceived the theater learning environment as less than ideal. The perceptions of theater learning environment did not change significantly among different stages of the program, different sectors of health care system, or different training regions of Saudi Arabia assuring the uniformity of urology training all over Saudi Arabia. The training programs should address significant concerns and pay close attention to areas in surgical theater educational environment, which need development and enhancement, mainly planned fashion of training, supportive supervision and hospital environment, and proper coverage and management of workloads. Copyright © 2014 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  14. Assessing the validity and reliability of three indicators self-reported on the pregnancy risk assessment monitoring system survey.

    PubMed

    Ahluwalia, Indu B; Helms, Kristen; Morrow, Brian

    2013-01-01

    We investigated the reliability and validity of three self-reported indicators from the Pregnancy Risk Assessment Monitoring System (PRAMS) survey. We used 2008 PRAMS (n=15,646) data from 12 states that had implemented the 2003 revised U.S. Certificate of Live Birth. We estimated reliability by kappa coefficient and validity by sensitivity and specificity using the birth certificate data as the reference for the following: prenatal participation in the Special Supplemental Nutrition Program for Women, Infants, and Children (WIC); Medicaid payment for delivery; and breastfeeding initiation. These indicators were examined across several demographic subgroups. The reliability was high for all three measures: 0.81 for WIC participation, 0.67 for Medicaid payment of delivery, and 0.72 for breastfeeding initiation. The validity of PRAMS indicators was also high: WIC participation (sensitivity = 90.8%, specificity = 90.6%), Medicaid payment for delivery (sensitivity = 82.4%, specificity = 85.6%), and breastfeeding initiation (sensitivity = 94.3%, specificity = 76.0%). The prevalence estimates were higher on PRAMS than the birth certificate for each of the indicators except Medicaid-paid delivery among non-Hispanic black women. Kappa values within most subgroups remained in the moderate range (0.40-0.80). Sensitivity and specificity values were lower for Hispanic women who responded to the PRAMS survey in Spanish and for breastfeeding initiation among women who delivered very low birthweight and very preterm infants. The validity and reliability of the PRAMS data for measures assessed were high. Our findings support the use of PRAMS data for epidemiological surveillance, research, and planning.

  15. A Survey of Clinical Faculty Calibration in Dental Hygiene Programs.

    PubMed

    Dicke, Nichole L; Hodges, Kathleen O; Rogo, Ellen J; Hewett, Beverly J

    2015-08-01

    This study investigated the calibration efforts of entry-level dental hygiene programs in the U.S. Four aspects were explored, including attitudes, characteristics, quality and satisfaction, to evaluate current calibration practices. A descriptive comparative survey design was used. Directors of accredited dental hygiene programs (n=345) were asked to forward an electronic survey invitation to clinical faculty. Eighty-five directors forwarded the survey to 847 faculty; 45.3% (n=384) participated. The 37-item survey contained multiple-choice and Likert scale questions and was available for 3 weeks. Descriptive statistics were used to analyze demographic data and research questions. The Kruskal-Wallis, Spearman Correlation Coefficient and Mann-Whitney U tests were employed to analyze hypotheses (p=0.05). The demographic profile for participants revealed that most worked for institutions awarding associate entry-level degrees, had 1 to 10 years' experience, taught clinically and didactically, and held a master's degree. Clinical instructors valued calibration, believed it reduced variation and wanted more calibration. Some were not offered quality calibration. There was a difference between the entry-level degree awarded and the program's evaluation of clinical skill faculty reliability, as analyzed using the Kruskal-Wallis test (p=0.008). Additionally, full-time versus part-time educators reported more observed student frustration with faculty variance, as evaluated using the Mann-Whitney U test (p=0.001, bfp=0.004). Faculty members value calibration's potential benefits and want enhanced calibration efforts. Calibration efforts need to be improved to include standards for measuring intra- and inter-rater reliability and plans for resolving inconsistencies. More research is needed to determine effective calibration methods and their impact on student learning. Copyright © 2015 The American Dental Hygienists’ Association.

  16. 49 CFR Appendix E to Part 238 - General Principles of Reliability-Based Maintenance Programs

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false General Principles of Reliability-Based... STANDARDS Pt. 238, App. E Appendix E to Part 238—General Principles of Reliability-Based Maintenance... maintenance programs are based on the following general principles. A failure is an unsatisfactory condition...

  17. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.« less

  18. Implementing corporate wellness programs: a business approach to program planning.

    PubMed

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  19. 14 CFR 1260.125 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Revision of budget and program plans. 1260....125 Revision of budget and program plans. (a) The budget plan is the financial expression of the... required to report deviations from budget and program plans, and request prior approvals for budget and...

  20. Computing Reliabilities Of Ceramic Components Subject To Fracture

    NASA Technical Reports Server (NTRS)

    Nemeth, N. N.; Gyekenyesi, J. P.; Manderscheid, J. M.

    1992-01-01

    CARES calculates fast-fracture reliability or failure probability of macroscopically isotropic ceramic components. Program uses results from commercial structural-analysis program (MSC/NASTRAN or ANSYS) to evaluate reliability of component in presence of inherent surface- and/or volume-type flaws. Computes measure of reliability by use of finite-element mathematical model applicable to multiple materials in sense model made function of statistical characterizations of many ceramic materials. Reliability analysis uses element stress, temperature, area, and volume outputs, obtained from two-dimensional shell and three-dimensional solid isoparametric or axisymmetric finite elements. Written in FORTRAN 77.

  1. Soldier Dimensions in Combat Models

    DTIC Science & Technology

    1990-05-07

    and performance. Questionnaires, SQTs, and ARTEPs were often used. Many scales had estimates of reliability but few had validity data. Most studies...pending its validation . Research plans were provided for applications in simulated combat and with simulation devices, for data previously gathered...regarding reliability and validity . Lack of information following an instrument indicates neither reliability nor validity information was provided by the

  2. Test effectiveness study report: An analytical study of system test effectiveness and reliability growth of three commercial spacecraft programs

    NASA Technical Reports Server (NTRS)

    Feldstein, J. F.

    1977-01-01

    Failure data from 16 commercial spacecraft were analyzed to evaluate failure trends, reliability growth, and effectiveness of tests. It was shown that the test programs were highly effective in ensuring a high level of in-orbit reliability. There was only a single catastrophic problem in 44 years of in-orbit operation on 12 spacecraft. The results also indicate that in-orbit failure rates are highly correlated with unit and systems test failure rates. The data suggest that test effectiveness estimates can be used to guide the content of a test program to ensure that in-orbit reliability goals are achieved.

  3. Flash Memory Reliability: Read, Program, and Erase Latency Versus Endurance Cycling

    NASA Technical Reports Server (NTRS)

    Heidecker, Jason

    2010-01-01

    This report documents the efforts and results of the fiscal year (FY) 2010 NASA Electronic Parts and Packaging Program (NEPP) task for nonvolatile memory (NVM) reliability. This year's focus was to measure latency (read, program, and erase) of NAND Flash memories and determine how these parameters drift with erase/program/read endurance cycling.

  4. Development of a Peer Teaching-Assessment Program and a Peer Observation and Evaluation Tool

    PubMed Central

    Trujillo, Jennifer M.; Barr, Judith; Gonyeau, Michael; Van Amburgh, Jenny A.; Matthews, S. James; Qualters, Donna

    2008-01-01

    Objectives To develop a formalized, comprehensive, peer-driven teaching assessment program and a valid and reliable assessment tool. Methods A volunteer taskforce was formed and a peer-assessment program was developed using a multistep, sequential approach and the Peer Observation and Evaluation Tool (POET). A pilot study was conducted to evaluate the efficiency and practicality of the process and to establish interrater reliability of the tool. Intra-class correlation coefficients (ICC) were calculated. Results ICCs for 8 separate lectures evaluated by 2-3 observers ranged from 0.66 to 0.97, indicating good interrater reliability of the tool. Conclusion Our peer assessment program for large classroom teaching, which includes a valid and reliable evaluation tool, is comprehensive, feasible, and can be adopted by other schools of pharmacy. PMID:19325963

  5. 18 CFR 430.15 - Conservation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... considered to assure more reliable supplies of water during emergencies. (4) A drought emergency plan... drought conditions shall be prepared in cooperation with the municipalities in the service area. The plan...) A drought emergency plan specifying the actions to be taken to reduce demand in the event of drought...

  6. 18 CFR 430.15 - Conservation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... considered to assure more reliable supplies of water during emergencies. (4) A drought emergency plan... drought conditions shall be prepared in cooperation with the municipalities in the service area. The plan...) A drought emergency plan specifying the actions to be taken to reduce demand in the event of drought...

  7. 18 CFR 430.15 - Conservation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... considered to assure more reliable supplies of water during emergencies. (4) A drought emergency plan... drought conditions shall be prepared in cooperation with the municipalities in the service area. The plan...) A drought emergency plan specifying the actions to be taken to reduce demand in the event of drought...

  8. 18 CFR 430.15 - Conservation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... considered to assure more reliable supplies of water during emergencies. (4) A drought emergency plan... drought conditions shall be prepared in cooperation with the municipalities in the service area. The plan...) A drought emergency plan specifying the actions to be taken to reduce demand in the event of drought...

  9. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  10. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  11. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  12. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  13. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  14. Large experimental wind turbines: Where we are now

    NASA Technical Reports Server (NTRS)

    Thomas, R. L.

    1976-01-01

    Several large wind turbine projects have been initiated by NASA-Lewis as part of the ERDA wind energy program. The projects consist of progressively large wind turbine ranging from 100 kW with a rotor diameter of 125 feet to 1500 kW with rotor diameters of 200 to 300 feet. Also included is supporting research and technology for large wind turbines and for lowering the costs and increasing the reliability of the major wind turbine components. The results and status of the above projects are briefly discussed in this report. In addition, a brief summary and status of the plans for selecting the utility sites for the experimental wind turbines is also discussed.

  15. Nickel hydrogen low Earth orbit life testing

    NASA Technical Reports Server (NTRS)

    Badcock, C. C.; Haag, R. L.

    1986-01-01

    A program to demonstrate the long term reliability of NiH2 cells in low Earth orbits (LEO) and support use in mid-altitude orbits (MAO) was initiated. Both 3.5 and 4.5 inch diameter nickel hydrogen cells are included in the test plan. Cells from all U.S. vendors are to be tested. The tests will be performed at -5 and 10 C at 40 and 60% DOD for LEO orbit and 10 C and 80% DOD for MAO orbit simulations. The goals of the testing are 20,000 cycles at 60% DOD and 30,000 cycles at 40% DOD. Cells are presently undergoing acceptance and characterization testing at Naval Weapons Systems Center, Crane.

  16. A view from the AIAA: Introduction of new energy storage technology into orbital programs

    NASA Technical Reports Server (NTRS)

    Badcock, Charles

    1987-01-01

    The development of new energy storage technology must be heavily weighted toward the application. The requirements for transitioning low risk technology into operational space vehicles must remain the central theme even at the preliminary development stages by the development of efforts to define operational issues and verify the reliability of the system. Failure to follow a complete plan that results in a flight qualified unit may lead to an orphan technology. Development efforts must be directed toward a stable development where changes in design are evolutionary and end items are equivalent to flight units so that life and qualification testing can be used as a vehicle to demonstrate the acceptability of the technology.

  17. The central equipment pool, an opportunity for improved technology management.

    PubMed

    Gentles, W M

    2000-01-01

    A model for a central equipment pool managed by a clinical engineering department has been presented. The advantages to patient care and to the clinical engineering department are many. The distribution of portable technology that has been traditionally managed by the materials management function is a logical match to the expanding role of clinical engineering departments in technology management. Accurate asset management tools have allowed us to provide reliable measures of infusion pump utilization, permitting us to predict future needs as programs expand. Thus we are more actively involved in strategic technology planning. The central equipment pool is an excellent opportunity for the clinical engineering department to increase its technology management activities.

  18. Intelligent Elements for the ISHM Testbed and Prototypes (ITP) Project

    NASA Technical Reports Server (NTRS)

    Maul, William A.; Park, Han; Schwabacher, Mark; Watson, Michael; Mackey, Ryan; Fijany, Amir; Trevino, Luis; Weir, John

    2005-01-01

    Deep-space manned missions will require advanced automated health assessment capabilities. Requirements such as in-space assembly, long dormant periods and limited accessibility during flight, present significant challenges that should be addressed through Integrated System Health Management (ISHM). The ISHM approach will provide safety and reliability coverage for a complete system over its entire life cycle by determining and integrating health status and performance information from the subsystem and component levels. This paper will focus on the potential advanced diagnostic elements that will provide intelligent assessment of the subsystem health and the planned implementation of these elements in the ISHM Testbed and Prototypes (ITP) Project under the NASA Exploration Systems Research and Technology program.

  19. 24 CFR 84.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Revision of budget and program... and Program Management § 84.25 Revision of budget and program plans. (a) The budget plan is the... required to report deviations from budget and program plans, and request prior approvals for budget and...

  20. Evaluation Planning, Evaluation Management, and Utilization of Evaluation Results within Adult Literacy Campaigns, Programs and Projects (with Implications for Adult Basic Education and Nonformal Education Programs in General). A Working Paper.

    ERIC Educational Resources Information Center

    Bhola, H. S.

    Addressed to professionals involved in program evaluation, this working paper covers various aspects of evaluation planning, including the following: planning as a sociotechnical process, steps in evaluation planning, program planning and implementation versus evaluation planning and implementation, the literacy system and its subsystems, and some…

  1. 43 CFR 12.925 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Revision of budget and program plans. 12... Organizations Post-Award Requirements § 12.925 Revision of budget and program plans. (a) The budget plan is the...) Recipients are required to report deviations from budget and program plans, and request prior approvals for...

  2. Using the Program Sustainability Assessment Tool to Assess and Plan for Sustainability

    PubMed Central

    Mainor, Avia; Moreland-Russell, Sarah; Maier, Ryan C.; Brossart, Laura; Luke, Douglas A.

    2014-01-01

    Implementing and growing a public health program that benefits society takes considerable time and effort. To ensure that positive outcomes are maintained over time, program managers and stakeholders should plan and implement activities to build sustainability capacity within their programs. We describe a 3-part sustainability planning process that programs can follow to build their sustainability capacity. First, program staff and stakeholders take the Program Sustainability Assessment Tool to measure their program’s sustainability across 8 domains. Next, managers and stakeholders use results from the assessment to inform and prioritize sustainability action planning. Lastly, staff members implement the plan and keep track of progress toward their sustainability goals. Through this process, staff can more holistically address the internal and external challenges and pressures associated with sustaining a program. We include a case example of a chronic disease program that completed the Program Sustainability Assessment Tool and engaged in program sustainability planning. PMID:24456644

  3. 75 FR 26745 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-12

    ... of October 15, 2009 Order on 2010 Business Plans and Budgets. Filed Date: 05/03/2010. Accession... Electric Reliability Corporation for Approval of Amended 2010 Business Plan and Budget of Western...

  4. Drinking Water Action Plan

    EPA Pesticide Factsheets

    EPA's Drinking Water Action Plan serves as a national call to action, urging all levels of government, utilities, community organizations, and other stakeholders to work together to increase the safety and reliability of drinking water.

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goodwin, Malik

    Reliable public lighting remains a critically important and valuable public service in Detroit, Michigan. The Downtown Detroit Energy Efficiency Lighting Program (the, “Program”) was designed and implemented to bring the latest advancements in lighting technology, energy efficiency, public safety and reliability to Detroit’s Central Business District, and the Program accomplished those goals successfully. Downtown’s nighttime atmosphere has been upgraded as a result of the installation of over 1000 new LED roadway lighting fixtures that were installed as part of the Program. The reliability of the lighting system has also improved.

  6. Nutrition and Other Protective Behaviors Motivated by Environmental Health Risk Awareness

    PubMed Central

    Jones, Elizabeth W.; Feng, Limin; Dixon, Jane K.; Dixon, John P.; Hofe, Carolyn R.; Gaetke, Lisa M.

    2016-01-01

    Background Research findings have suggested that exposure to environmental pollutants contributes to increased health risks, which may be modulated by certain nutrition and other protective health behaviors. Nutrition professionals play an important role in effectively disseminating this information and in devising specific community-based nutrition education programs for audiences located in areas with environmental health issues. Objective To assess awareness of environmental health problems and motivation to adopt protective health behaviors for use in planning nutrition education programs for communities exposed to environmental pollutants. Method Data were collected from a modified, validated Environmental Health Engagement Profile (EHEP) survey instrument administered to adults (n=774) participating in community events in Kentucky based on location relative to hazardous waste sites. Results The modified EHEP survey instrument showed good internal consistency reliability, and demographic characteristics were evaluated. Correlation analyses revealed significant positive correlations in all groups, separately and combined, between awareness of environmental pollution in an individual’s surroundings and the extent of concern that pollutants cause adverse health effects (P < 0.01) and between concern that pollutants cause adverse health effects and taking personal actions to protect against such environmental insults (P < 0.01). The groups having the highest level of awareness posed by pollution are those residing near federally designated hazardous waste sites. Conclusion These results suggest that determining and expanding an audience’s knowledge and perceptions of environmental health risks will enhance effective nutrition education program planning. PMID:28090221

  7. Change in "resolved plans" and "suicidal ideation" factors of suicidality after participation in an intensive outpatient treatment program.

    PubMed

    Minnix, Jennifer A; Romero, Catherine; Joiner, Thomas E; Weinberg, Elizabeth F

    2007-11-01

    This study aims to investigate factors related to suicide in a unique clinical population with more chronic psychopathology than many outpatient samples. One hundred and five adult outpatients were included in the current study. We predicted that higher scores on the resolved plans and preparation (RPP) factor of the Beck Suicide Scale [Beck, A.T., Kovacs, M., Weissman, M., (1979). Assessment of suicidal intention: The scale for suicidal ideation. Journal of Consulting and Clinical Psychology 47, 343-352] would predict multiple attempter status even after accounting for co-morbid diagnoses and suicidal ideation (SI) factor scores. Additionally, we predicted that the scores on the RPP factor would decrease less over time than scores on the SI factor. Results were consistent with both hypotheses, suggesting that RPP factor scores were uniquely predictive of status as a multiple attempter and were more stable over time. Mental health diagnoses were rendered without the use of a structured interview and therefore no reliability data were collected.

  8. Extended performance solar electric propulsion thrust system study. Volume 3: Tradeoff studies of alternate thrust system configurations

    NASA Technical Reports Server (NTRS)

    Hawthorne, E. I.

    1977-01-01

    Several thrust system design concepts were evaluated and compared using the specifications of the most advanced 30 cm engineering model thruster as the technology base. Emphasis was placed on relatively high power missions. The extensions in thruster performance required for the Halley's comet mission were defined and alternative thrust system concepts were designed in sufficient detail for comparing mass, efficiency, reliability, structure, and thermal characteristics. Confirmation testing and analysis of thruster and power-processing components were performed. A baseline design was selected from the alternatives considered, and the design analysis and documentation were refined. A program development plan was formulated that outlines the work structure considered necessary for developing, qualifying, and fabricating the flight hardware for the baseline thrust system within the time frame of a project to rendezvous with Halley's comet. An assessment was made of the costs and risks associated with a baseline thrust system as provided to the mission project under this plan. Critical procurements and interfaces were identified and defined.

  9. Summary results of the first United States manned orbital space flight

    NASA Technical Reports Server (NTRS)

    Glenn, J. H. Jr

    1963-01-01

    This paper describes the principal findings of the first United States manned orbital space flight in light of the flight mission. Consideration is given to the coordinated tracking network, recovery forces and to the spacecraft and its several functional systems. These include mechanisms for heat protection, escape maneuvers, spacecraft control, power supply, communications, life support and landing. A few difficulties encountered in the flight and deviations from the planned sequence are described. Craft preparation, aeromedical studies, flight plan and particularly flight observations--including the color, light, horizon visibility by day and by night, cloud formations and sunrise and sunset effects are given in some detail. The general conclusion from the MA-6 flight is that man can adapt well to new conditions encountered in space flight and that man can contribute importantly to mission reliability and toward mission achievement through his capacities to control the spacecraft and its multiple systems contribute to decision making and adaptation of programming as well as to direct exploratory and experimental observations.

  10. The role of water vapor in climate. A strategic research plan for the proposed GEWEX water vapor project (GVaP)

    NASA Technical Reports Server (NTRS)

    Starr, D. OC. (Editor); Melfi, S. Harvey (Editor)

    1991-01-01

    The proposed GEWEX Water Vapor Project (GVaP) addresses fundamental deficiencies in the present understanding of moist atmospheric processes and the role of water vapor in the global hydrologic cycle and climate. Inadequate knowledge of the distribution of atmospheric water vapor and its transport is a major impediment to progress in achieving a fuller understanding of various hydrologic processes and a capability for reliable assessment of potential climatic change on global and regional scales. GVap will promote significant improvements in knowledge of atmospheric water vapor and moist processes as well as in present capabilities to model these processes on global and regional scales. GVaP complements a number of ongoing and planned programs focused on various aspects of the hydrologic cycle. The goal of GVaP is to improve understanding of the role of water vapor in meteorological, hydrological, and climatological processes through improved knowledge of water vapor and its variability on all scales. A detailed description of the GVaP is presented.

  11. Chemical dependency and drug testing in the workplace.

    PubMed

    Osterloh, J D; Becker, C E

    1990-05-01

    Urine testing for drug use in the workplace is now widespread, with the prevalence of positive drug tests in the work force being 0% to 15%. The prevalence of marijuana use is highest, and this can be reliably tested. Though it is prudent to rid the workplace of drug use, there is little scientific study on the relationship of drug use and workplace outcomes, such as productivity and safety. Probable-cause testing and preemployment testing are the most common applications. Random testing has been less accepted owing to its higher costs, unresolved legal issues, and predictably poor test reliability. Legal issues have focused on the right to policy, discrimination, and the lack of due process. The legal cornerstone of a good program is a policy that is planned and agreed on by both labor and management, which serves both as a contract and as a procedure in which expectations and consequences are known. The National Institute on Drug Abuse is certifying laboratories doing employee drug testing. Testing methods when done correctly are less prone to error than in the past, but screening tests can be defeated by adulterants. Although the incidence of false-positive results is low, such tests are less reliable when the prevalence of drug abuse is also low.

  12. Chemical dependency and drug testing in the workplace.

    PubMed

    Osterloh, J D; Becker, C E

    1990-01-01

    Urine testing for drug use in the workplace is now widespread, with the prevalence of positive drug tests in the work force being 0% to 15%. The prevalence of marijuana use is highest of the illicit drugs being tested. Highly prevalent drugs can be reliably tested. Although it is prudent to rid the workplace of drug use, there is little scientific study on the relationship of drug use and workplace outcomes, such as productivity and safety. Probable-cause testing and preemployment testing are the most common applications. Random testing has been less accepted owing to its higher costs, unresolved legal issues, and predictably poor test reliability. Legal issues have focused on the right to privacy, policy agreements, discrimination, and the lack of due process. The legal cornerstone of a good program is a policy that is planned and agreed on by both labor and management, which serves both as a contract and as a procedure in which expectations and consequences are known. Moreover, NIDA is certifying laboratories doing employee drug testing. Testing methods, when done correctly, are less prone to error than in the past, but screening tests can be defeated by adulterants. Although the incidence of false-positive results is low, such tests are less reliable when the prevalence of drug abuse is also low.

  13. 45 CFR 309.35 - What are the procedures for review of a Tribal IV-D program application, plan or plan amendment?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) The effective date of a plan or plan amendment may not be earlier than the first day of the fiscal... program application, plan or plan amendment? 309.35 Section 309.35 Public Welfare Regulations Relating to... of a Tribal IV-D program application, plan or plan amendment? (a) The Secretary will promptly review...

  14. Strategic planning decision making using fuzzy SWOT-TOPSIS with reliability factor

    NASA Astrophysics Data System (ADS)

    Mohamad, Daud; Afandi, Nur Syamimi; Kamis, Nor Hanimah

    2015-10-01

    Strategic planning is a process of decision making and action for long-term activities in an organization. The Strengths, Weaknesses, Opportunities and Threats (SWOT) analysis has been commonly used to help organizations in strategizing their future direction by analyzing internal and external environment. However, SWOT analysis has some limitations as it is unable to prioritize appropriately the multiple alternative strategic decisions. Some efforts have been made to solve this problem by incorporating Multi Criteria Decision Making (MCDM) methods. Nevertheless, another important aspect has raised concerns on obtaining the decision that is the reliability of the information. Decision makers evaluate differently depending on their level of confidence or sureness in the evaluation. This study proposes a decision making procedure for strategic planning using SWOT-TOPSIS method by incorporating the reliability factor of the evaluation based on Z-number. An example using a local authority in the east coast of Malaysia is illustrated to determine the strategic options ranking and to prioritize factors in each SWOT category.

  15. What Can the Business World Teach Us about Strategic Planning?

    ERIC Educational Resources Information Center

    Spackman, Jonathan S.; Thorup, Jennifer; Howell, Scott L.

    2015-01-01

    The need for a reliable strategic planning framework for distance educators and their institutions has never been greater than it is now. Increased government regulations, accreditation standards, and competition are converging with decreased funding from federal, state, and private sources, and administrators require better strategic planning. A…

  16. 77 FR 26714 - Transmission Planning Reliability Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ... non-consequential load loss that satisfies the relevant Commission's directives in Order No. 693 and... that would allow a transmission planner to plan for non-consequential load loss following a single...), footnote 12 that would allow a transmission planner to plan for ``non-consequential load loss,'' i.e., load...

  17. 76 FR 66229 - Transmission Planning Reliability Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-26

    ... Transmission Services, at all demand levels over the range of forecast system demands, under the contingency... any planned firm load that is not directly served by the elements that are removed from service as a... to plan for the loss of firm service for a single contingency, the Commission finds that their...

  18. TU-AB-201-04: Optimizing the Number of Catheter Implants and Their Tracks for Prostate HDR Brachytherapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Riofrio, D; Luan, S; Zhou, J

    Purpose: In prostate HDR brachytherapy, interstitial implants are placed manually on the fly. The aim for this research is to develop a computer algorithm to find optimal and reliable implant trajectories using minimal number of implants. Methods: Our new algorithm mainly uses these key ideas: (1) positive charged static particles are uniformly placed on the surface of prostate and critical structures such as urethra, bladder, and rectum. (2) Positive charged kinetic particles are placed at a cross-section of the prostate with an initial velocity parallel to the principal implant direction. (3) The kinetic particles move through the prostate, interacting withmore » each other, spreading out, while staying away from the prostate surface and critical structures. The initial velocity ensures that the trajectories observe the curvature constraints of typical implant procedures. (4) The finial trajectories of kinetic particles are smoothed using a third-degree polynomial regression, which become the implant trajectories. (5) The dwelling times and final dose distribution are calculated using least-distance programming. Results: (1) We experimented with previously treated cases. Our plan achieves all prescription goals while reducing the number of implants by 41%! Our plan also has less uniform target dose, which implies a higher dose is delivered to the prostate. (2) We expect future implant procedures will be performed under the guidance of such pre-calculated trajectories. To assess the applicability, we randomly perturb the tracks to mimic the manual implant errors. Our studies showed the impact of these perturbations are negligible, which is compensated by the least distance programming. Conclusions: We developed a new inverse planning system for prostate HDR therapy that can find optimal implant trajectories while minimizing the number of implants. For future work, we plan to integrate our new inverse planning system with an existing needle tracking system.« less

  19. Propulsion Health Management System Development for Affordable and Reliable Operation of Space Exploration Systems

    NASA Technical Reports Server (NTRS)

    Melcher, Kevin J.; Maul, William A.; Garg, Sanjay

    2007-01-01

    The constraints of future Exploration Missions will require unique integrated system health management capabilities throughout the mission. An ambitious launch schedule, human-rating requirements, long quiescent periods, limited human access for repair or replacement, and long communication delays, all require an integrated approach to health management that can span distinct, yet interdependent vehicle subsystems, anticipate failure states, provide autonomous remediation and support the Exploration Mission from beginning to end. Propulsion is a critical part of any space exploration mission, and monitoring the health of the propulsion system is an integral part of assuring mission safety and success. Health management is a somewhat ubiquitous technology that encompasses a large spectrum of physical components and logical processes. For this reason, it is essential to develop a systematic plan for propulsion health management system development. This paper provides a high-level perspective of propulsion health management systems, and describes a logical approach for the future planning and early development that are crucial to planned space exploration programs. It also presents an overall approach, or roadmap, for propulsion health management system development and a discussion of the associated roadblocks and challenges.

  20. 20 CFR 632.255 - Program planning.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a)(1) In developing the summer program, the Native American grantee shall coordinate the summer plan..., except that 45 days prior to the beginning of the summer program and 45 days after the summer program...

  1. 20 CFR 632.255 - Program planning.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a)(1) In developing the summer program, the Native American grantee shall coordinate the summer plan..., except that 45 days prior to the beginning of the summer program and 45 days after the summer program...

  2. Fortran programs for reliability analysis

    Treesearch

    John J. Zahn

    1992-01-01

    This report contains a set of FORTRAN subroutines written to calculate the Hasofer-Lind reliability index. Nonlinear failure criteria and correlated basic variables are permitted. Users may incorporate these routines into their own calling program (an example program, RELANAL, is included) and must provide a failure criterion subroutine (two example subroutines,...

  3. Improvement of Experiment Planning as an Important Precondition for the Quality of Educational Research

    ERIC Educational Resources Information Center

    Rutkiene, Ausra; Tereseviciene, Margarita

    2010-01-01

    The article presents the stages of the experiment planning that are necessary to ensure the validity and reliability of it. The research data reveal that doctoral students of Educational Research approach the planning of the experiment as the planning of the whole dissertation research; and the experiment as a research method is often confused…

  4. Logistics planning for phased programs.

    NASA Technical Reports Server (NTRS)

    Cook, W. H.

    1973-01-01

    It is pointed out that the proper and early integration of logistics planning into the phased program planning process will drastically reduce these logistics costs. Phased project planning is a phased approach to the planning, approval, and conduct of major research and development activity. A progressive build-up of knowledge of all aspects of the program is provided. Elements of logistics are discussed together with aspects of integrated logistics support, logistics program planning, and logistics activities for phased programs. Continuing logistics support can only be assured if there is a comprehensive sequential listing of all logistics activities tied to the program schedule and a real-time inventory of assets.

  5. Development of a self-report questionnaire designed for population-based surveillance of gingivitis in adolescents: assessment of content validity and reliability

    PubMed Central

    QUIROZ, Viviana; REINERO, Daniela; HERNÁNDEZ, Patricia; CONTRERAS, Johanna; VERNAL, Rolando; CARVAJAL, Paola

    2017-01-01

    Abstract The major infectious diseases in Chile encompass the periodontal diseases, with a combined prevalence that rises up to 90% of the population. Thus, the population-based surveillance of periodontal diseases plays a central role for assessing their prevalence and for planning, implementing, and evaluating preventive and control programs. Self-report questionnaires have been proposed for the surveillance of periodontal diseases in adult populations world-wide. Objective This study aimed to develop and assess the content validity and reliability of a cognitively adapted self-report questionnaire designed for surveillance of gingivitis in adolescents. Material and Methods Ten predetermined self-report questions evaluating early signs and symptoms of gingivitis were preliminary assessed by a panel of clinical experts. Eight questions were selected and cognitively tested in 20 adolescents aged 12 to 18 years from Santiago de Chile. The questionnaire was then conducted and answered by 178 Chilean adolescents. Internal consistency was measured using the Cronbach’s alpha and temporal stability was calculated using the Kappa-index. Results A reliable final self-report questionnaire consisting of 5 questions was obtained, with a total Cronbach’s alpha of 0.73 and a Kappa-index ranging from 0.41 to 0.77 between the different questions. Conclusions The proposed questionnaire is reliable, with an acceptable internal consistency and a temporal stability from moderate to substantial, and it is promising for estimating the prevalence of gingivitis in adolescents. PMID:28877279

  6. Functional evaluation of treatment of chronic disease: Validity and reliability of the Turkish version of the Spiritual Well-Being Scale.

    PubMed

    Aktürk, Ümmühan; Erci, Behice; Araz, Murat

    2017-12-01

    This study was conducted for the purpose of adapting the Functional Assessment of Chronic Illness Therapy-Spiritual Well-Being Scale (FACIT-Sp) for the Turkish context and determining its validity and reliability. In 2016, a convenience sample of 137 cancer patients from Malatya State Hospital completed a structured questionnaire, which provided demographic characteristics, and the FACIT-Sp-12 for patients with cancer. The obtained data were assessed using Cronbach's alpha reliability coefficient (α), Pearson's product-moment correlation coefficient (r), factor analysis, Bartlett's test of sphericity, and the Kaiser-Meyer-Olkin (KMO) measure of sampling adequacy. The result of the KMO test was determined to be 0.827 and that of Bartlett's test 988.692, and both were observed to be significant at a level of p < 0.001. The value of Cronbach's α for the Spiritual Well-Being Scale (SWBS) was determined to be 0.87, and the α values for the SWBS subgroups ranged from 0.78 to 0.93. Our analysis determined that the factors had initial eigenvalues above 1, and that they accounted for 61.61% of the total variance. Our study determined that the Turkish version of the FACIT-Sp has validity and reliability and can be used in Turkish society. We believe that the scale can be used safely in determining convenient care and in planning individual educational programs to enhance patients' spiritual well-being.

  7. Southeastern Power Administration 2007 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2007-12-28

    Dear Secretary Chu: I am proud to submit Southeastern Power Administration’s (Southeastern’s) fiscal year (FY) 2007 Annual Report for your review. The information included in this report reflects Southeastern’s programs, accomplishments, and financial activities for the 12-month period beginning October 1, 2006 and ending September 30, 2007. Southeastern marketed more than 5 billion kilowatt-hours of energy to 492 wholesale Federal power customers in an 11-state marketing area in FY 2007. Revenues from the sale of this power totaled approximately $219 million. Drought conditions continued to plague the southeast region of the United States during 2007 placing strains on our naturalmore » and financial resources. Southeastern purchased more than $40 million in replacement power to meet customer contract requirements to ensure the continued reliability of our nation’s power grid. With the financial assistance and support of our Federal power customers, continued funding for capitalized equipment replacements at various Corps of Engineers’ (Corps) hydroelectric projects provided much needed repairs and maintenance for aging facilities. Southeastern’s cyber and physical security program continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation standards and requirements. Plans for the upcoming year include communication and cooperation with DOE, Federal power customers, and the Corps to maximize the benefits of our nation’s water resources. Competition for the use of water and the prolonged drought conditions will present another challenging year for our agency. The employees at Southeastern will be proactive in meeting these challenges and providing reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E. Legg Administrator« less

  8. Developing a tool for assessing competency in root cause analysis.

    PubMed

    Gupta, Priyanka; Varkey, Prathibha

    2009-01-01

    Root cause analysis (RCA) is a tool for identifying the key cause(s) contributing to a sentinel event or near miss. Although training in RCA is gaining popularity in medical education, there is no published literature on valid or reliable methods for assessing competency in the same. A tool for assessing competency in RCA was pilot tested as part of an eight-station Objective Structured Clinical Examination that was conducted at the completion of a three-week quality improvement (QI) curriculum for the Mayo Clinic Preventive Medicine and Endocrinology fellowship programs. As part of the curriculum, fellows completed a QI project to enhance physician communication of the diagnosis and treatment plan at the end of a patient visit. They had a didactic session on RCA, followed by process mapping of the information flow at the project clinic, after which fellows conducted an actual RCA using the Ishikawa fishbone diagram. For the RCA competency assessment, fellows performed an RCA regarding a scenario describing an adverse medication event and provided possible solutions to prevent such errors in the future. All faculty strongly agreed or agreed that they were able to accurately assess competency in RCA using the tool. Interrater reliability for the global competency rating and checklist scoring were 0.96 and 0.85, respectively. Internal consistency (Cronbach's alpha) was 0.76. Six of eight of the fellows found the difficulty level of the test to be optimal. Assessment methods must accompany education programs to ensure that graduates are competent in QI methodologies and are able to apply them effectively in the workplace. The RCA assessment tool was found to be a valid, reliable, feasible, and acceptable method for assessing competency in RCA. Further research is needed to examine its predictive validity and generalizability.

  9. Project MOVE Program Planning Kit.

    ERIC Educational Resources Information Center

    Farris, Charlotte J.

    This program planning kit contains information and activities on evaluation, change, leadership, and sex stereotyping which provided the basis for planning Project MOVE (Maximizing Options in Vocational Education) programs but which can be generalized and adapted for use in planning other programs. Assumptions ano guidelines based upon theory and…

  10. Clinical audit project in undergraduate medical education curriculum: an assessment validation study

    PubMed Central

    Steketee, Carole; Mak, Donna

    2016-01-01

    Objectives To evaluate the merit of the Clinical Audit Project (CAP) in an assessment program for undergraduate medical education using a systematic assessment validation framework. Methods A cross-sectional assessment validation study at one medical school in Western Australia, with retrospective qualitative analysis of the design, development, implementation and outcomes of the CAP, and quantitative analysis of assessment data from four cohorts of medical students (2011- 2014). Results The CAP is fit for purpose with clear external and internal alignment to expected medical graduate outcomes.  Substantive validity in students’ and examiners’ response processes is ensured through relevant methodological and cognitive processes. Multiple validity features are built-in to the design, planning and implementation process of the CAP.  There is evidence of high internal consistency reliability of CAP scores (Cronbach’s alpha > 0.8) and inter-examiner consistency reliability (intra-class correlation>0.7). Aggregation of CAP scores is psychometrically sound, with high internal consistency indicating one common underlying construct.  Significant but moderate correlations between CAP scores and scores from other assessment modalities indicate validity of extrapolation and alignment between the CAP and the overall target outcomes of medical graduates.  Standard setting, score equating and fair decision rules justify consequential validity of CAP scores interpretation and use. Conclusions This study provides evidence demonstrating that the CAP is a meaningful and valid component in the assessment program. This systematic framework of validation can be adopted for all levels of assessment in medical education, from individual assessment modality, to the validation of an assessment program as a whole.  PMID:27716612

  11. Use of Probabilistic Engineering Methods in the Detailed Design and Development Phases of the NASA Ares Launch Vehicle

    NASA Technical Reports Server (NTRS)

    Fayssal, Safie; Weldon, Danny

    2008-01-01

    The United States National Aeronautics and Space Administration (NASA) is in the midst of a space exploration program called Constellation to send crew and cargo to the international Space Station, to the moon, and beyond. As part of the Constellation program, a new launch vehicle, Ares I, is being developed by NASA Marshall Space Flight Center. Designing a launch vehicle with high reliability and increased safety requires a significant effort in understanding design variability and design uncertainty at the various levels of the design (system, element, subsystem, component, etc.) and throughout the various design phases (conceptual, preliminary design, etc.). In a previous paper [1] we discussed a probabilistic functional failure analysis approach intended mainly to support system requirements definition, system design, and element design during the early design phases. This paper provides an overview of the application of probabilistic engineering methods to support the detailed subsystem/component design and development as part of the "Design for Reliability and Safety" approach for the new Ares I Launch Vehicle. Specifically, the paper discusses probabilistic engineering design analysis cases that had major impact on the design and manufacturing of the Space Shuttle hardware. The cases represent important lessons learned from the Space Shuttle Program and clearly demonstrate the significance of probabilistic engineering analysis in better understanding design deficiencies and identifying potential design improvement for Ares I. The paper also discusses the probabilistic functional failure analysis approach applied during the early design phases of Ares I and the forward plans for probabilistic design analysis in the detailed design and development phases.

  12. Clinical audit project in undergraduate medical education curriculum: an assessment validation study.

    PubMed

    Tor, Elina; Steketee, Carole; Mak, Donna

    2016-09-24

    To evaluate the merit of the Clinical Audit Project (CAP) in an assessment program for undergraduate medical education using a systematic assessment validation framework. A cross-sectional assessment validation study at one medical school in Western Australia, with retrospective qualitative analysis of the design, development, implementation and outcomes of the CAP, and quantitative analysis of assessment data from four cohorts of medical students (2011- 2014). The CAP is fit for purpose with clear external and internal alignment to expected medical graduate outcomes.  Substantive validity in students' and examiners' response processes is ensured through relevant methodological and cognitive processes. Multiple validity features are built-in to the design, planning and implementation process of the CAP.  There is evidence of high internal consistency reliability of CAP scores (Cronbach's alpha > 0.8) and inter-examiner consistency reliability (intra-class correlation>0.7). Aggregation of CAP scores is psychometrically sound, with high internal consistency indicating one common underlying construct.  Significant but moderate correlations between CAP scores and scores from other assessment modalities indicate validity of extrapolation and alignment between the CAP and the overall target outcomes of medical graduates.  Standard setting, score equating and fair decision rules justify consequential validity of CAP scores interpretation and use. This study provides evidence demonstrating that the CAP is a meaningful and valid component in the assessment program. This systematic framework of validation can be adopted for all levels of assessment in medical education, from individual assessment modality, to the validation of an assessment program as a whole.

  13. Transit service reliability

    DOT National Transportation Integrated Search

    1978-12-01

    This report presents a comprehensive overview of the subject of transit service reliability and provides a framework for a program of demonstrations and research studies which could be carried out under the Service and Methods Demonstration program. ...

  14. The reliable multicast protocol application programming interface

    NASA Technical Reports Server (NTRS)

    Montgomery , Todd; Whetten, Brian

    1995-01-01

    The Application Programming Interface for the Berkeley/WVU implementation of the Reliable Multicast Protocol is described. This transport layer protocol is implemented as a user library that applications and software buses link against.

  15. Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizesmore » current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.« less

  16. Program for computer aided reliability estimation

    NASA Technical Reports Server (NTRS)

    Mathur, F. P. (Inventor)

    1972-01-01

    A computer program for estimating the reliability of self-repair and fault-tolerant systems with respect to selected system and mission parameters is presented. The computer program is capable of operation in an interactive conversational mode as well as in a batch mode and is characterized by maintenance of several general equations representative of basic redundancy schemes in an equation repository. Selected reliability functions applicable to any mathematical model formulated with the general equations, used singly or in combination with each other, are separately stored. One or more system and/or mission parameters may be designated as a variable. Data in the form of values for selected reliability functions is generated in a tabular or graphic format for each formulated model.

  17. Preliminary Analysis of LORAN-C System Reliability for Civil Aviation.

    DTIC Science & Technology

    1981-09-01

    overviev of the analysis technique. Section 3 describes the computerized LORAN-C coverage model which is used extensively in the reliability analysis...Xth Plenary Assembly, Geneva, 1963, published by International Telecomunications Union. S. Braff, R., Computer program to calculate a Karkov Chain Reliability Model, unpublished york, MITRE Corporation. A-1 I.° , 44J Ili *Y 0E 00 ...F i8 1110 Prelim inary Analysis of Program Engineering & LORAN’C System ReliabilityMaintenance Service i ~Washington. D.C.

  18. Managing Reliability in the 21st Century

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dellin, T.A.

    1998-11-23

    The rapid pace of change at Ike end of the 20th Century should continue unabated well into the 21st Century. The driver will be the marketplace imperative of "faster, better, cheaper." This imperative has already stimulated a revolution-in-engineering in design and manufacturing. In contrast, to date, reliability engineering has not undergone a similar level of change. It is critical that we implement a corresponding revolution-in-reliability-engineering as we enter the new millennium. If we are still using 20th Century reliability approaches in the 21st Century, then reliability issues will be the limiting factor in faster, better, and cheaper. At the heartmore » of this reliability revolution will be a science-based approach to reliability engineering. Science-based reliability will enable building-in reliability, application-specific products, virtual qualification, and predictive maintenance. The purpose of this paper is to stimulate a dialogue on the future of reliability engineering. We will try to gaze into the crystal ball and predict some key issues that will drive reliability programs in the new millennium. In the 21st Century, we will demand more of our reliability programs. We will need the ability to make accurate reliability predictions that will enable optimizing cost, performance and time-to-market to meet the needs of every market segment. We will require that all of these new capabilities be in place prior to the stint of a product development cycle. The management of reliability programs will be driven by quantifiable metrics of value added to the organization business objectives.« less

  19. The Reliability of Anthropometric Measurements Used Preoperatively in Aesthetic Breast Surgery.

    PubMed

    Isaac, Kathryn V; Murphy, Blake D; Beber, Brett; Brown, Mitchell

    2016-04-01

    Patient outcomes in aesthetic breast surgery are highly dependent on breast measurements used in preoperative planning. The purpose of this study is to determine the reliability of anthropometric breast measurements. Four raters measured 28 women using 7 measurements: sternal notch to nipple distance (Sn-N), nipple to midline (N-M), nipple to inframammary-fold distance under maximal stretch (N-IMF), breast base width (BW), soft tissue pinch thickness of the upper pole (STPT:UP), STPT at the inframammary fold (STPT:IMF), and anterior pull skin stretch (APSS). Reliability was assessed using intra-class correlation coefficients (ICCs). Inter-rater reliability was excellent for Sn-N, N-M, and BW (ICC = 0.94, 0.90, and 0.76, respectively) and was good for N-IMF (ICC = 0.70). The STPT:UP, STPT:IMF, and APSS measurements were not reliable between raters (ICC < 0.2). Intra-rater reliability was excellent for Sn-N, N-M, and BW for all raters (all ICC > 0.75). The N-IMF intra-rater reliability was excellent in senior raters (ICC > 0.75) and good in junior raters (ICC > 0.6). The STPT:UP, STPT:IMF, and APSS measurements showed fair or poor reliability for most raters (ICC < 0.6). The Sn-N, N-M, and BW measurements are very reliable. Dynamic measurements including APSS, STPT:UP, and STUP:IMF are unreliable. N-IMF is the only reliable dynamic measurement, and its reliability improves with increasing clinical experience. The variable reliability of preoperative measurements must be considered in the planning of aesthetic breast surgery. 4 Diagnostic. © 2015 The American Society for Aesthetic Plastic Surgery, Inc. Reprints and permission: journals.permissions@oup.com.

  20. Materials and Designs for High-Efficacy LED Light Engines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ibbetson, James; Gresback, Ryan

    Cree, Inc. conducted a narrow-band downconverter (NBD) materials development and implementation program which will lead to warm-white LED light engines with enhanced efficacy via improved spectral efficiency with respect to the human eye response. New red (600-630nm) NBD materials could result in as much as a 20% improvement in warm-white efficacy at high color quality relative to conventional phosphor-based light sources. Key program innovations included: high quantum yield; narrow peak width; minimized component-level losses due to “cross-talk” and light scattering among red and yellow-green downconverters; and improved reliability to reach parity with conventional phosphors. NBD-enabled downconversion efficiency gains relative tomore » conventional phosphors yielded an end-of-project LED light engine efficacy of >160 lm/W at room temperature and 35 A/cm2, with a correlated color temperature (CCT) of ~3500K and >90 CRI (Color Rending Index). NBD-LED light engines exhibited equivalent luminous flux and color point maintenance at >1,000 hrs. of highly accelerated reliability testing as conventional phosphor LEDs. A demonstration luminaire utilizing an NBD-based LED light engine had a steady-state system efficacy of >150 lm/W at ~3500K and >90 CRI, which exceeded the 2014 DOE R&D Plan luminaire milestone for FY17 of >150 lm/W at just 80 CRI.« less

  1. Development of large, horizontal-axis wind turbines

    NASA Technical Reports Server (NTRS)

    Baldwin, D. H.; Kennard, J.

    1985-01-01

    A program to develop large, horizontal-axis wind turbines is discussed. The program is directed toward developing the technology for safe, reliable, environmentally acceptable large wind turbines that can generate a significant amount of electricity at costs competitive with those of conventional electricity-generating systems. In addition, these large wind turbines must be fully compatible with electric utility operations and interface requirements. Several ongoing projects in large-wind-turbine development are directed toward meeting the technology requirements for utility applications. The machines based on first-generation technology (Mod-OA and Mod-1) successfully completed their planned periods of experimental operation in June, 1982. The second-generation machines (Mod-2) are in operation at selected utility sites. A third-generation machine (Mod-5) is under contract. Erection and initial operation of the Mod-5 in Hawaii should take place in 1986. Each successive generation of technology increased reliability and energy capture while reducing the cost of electricity. These advances are being made by gaining a better understanding of the system-design drivers, improving the analytical design tools, verifying design methods with operating field data, and incorporating new technology and innovative designs. Information is given on the results from the first- and second-generation machines (Mod-OA, - 1, and -2), the status of the Department of Interior, and the status of the third-generation wind turbine (Mod-5).

  2. Medical System Concept of Operations for Mars Exploration Missions

    NASA Technical Reports Server (NTRS)

    Urbina, Michelle; Rubin, D.; Hailey, M.; Reyes, D.; Antonsen, Eric

    2017-01-01

    Future exploration missions will be the first time humanity travels beyond Low Earth Orbit (LEO) since the Apollo program, taking us to cis-lunar space, interplanetary space, and Mars. These long-duration missions will cover vast distances, severely constraining opportunities for emergency evacuation to Earth and cargo resupply opportunities. Communication delays and blackouts between the crew and Mission Control will eliminate reliable, real-time telemedicine consultations. As a result, compared to current LEO operations onboard the International Space Station, exploration mission medical care requires an integrated medical system that provides additional in-situ capabilities and a significant increase in crew autonomy. The Medical System Concept of Operations for Mars Exploration Missions illustrates how a future NASA Mars program could ensure appropriate medical care for the crew of this highly autonomous mission. This Concept of Operations document, when complete, will document all mission phases through a series of mission use case scenarios that illustrate required medical capabilities, enabling the NASA Human Research Program (HRP) Exploration Medical Capability (ExMC) Element to plan, design, and prototype an integrated medical system to support human exploration to Mars.

  3. Final Environmental Impact Statement (EIS) for the Space Nuclear Thermal Propulsion (SNTP) program

    NASA Astrophysics Data System (ADS)

    1991-09-01

    A program has been proposed to develop the technology and demonstrate the feasibility of a high-temperature particle bed reactor (PBR) propulsion system to be used to power an advanced second stage nuclear rocket engine. The purpose of this Final Environmental Impact Statement (FEIS) is to assess the potential environmental impacts of component development and testing, construction of ground test facilities, and ground testing. Major issues and goals of the program include the achievement and control of predicted nuclear power levels; the development of materials that can withstand the extremely high operating temperatures and hydrogen flow environments; and the reliable control of cryogenic hydrogen and hot gaseous hydrogen propellant. The testing process is designed to minimize radiation exposure to the environment. Environmental impact and mitigation planning are included for the following areas of concern: (1) Population and economy; (2) Land use and infrastructure; (3) Noise; (4) Cultural resources; (5) Safety (non-nuclear); (6) Waste; (7) Topography; (8) Geology; (9) Seismic activity; (10) Water resources; (11) Meteorology/Air quality; (12) Biological resources; (13) Radiological normal operations; (14) Radiological accidents; (15) Soils; and (16) Wildlife habitats.

  4. Telemedicine.

    PubMed

    Dorman, T

    2000-09-01

    Telemedicine began from the humble beginnings of the first telephone call from Alexander Graham Bell to his associate, Watson. These systems already have been used for educational programs, consultative care, image transfer, second opinions, and direct acute patient care. Most of the original programs failed because of several reasons, primarily because of lack of funding when a grant ended. The major lesson of these programs is that a solid business plan is needed initially for long-term survival. The reliability of telemedical examinations has been demonstrated superficially, but more conclusive work in this area is needed. Studies that evaluate clinical, financial, and satisfaction outcomes are required simultaneously. Further integration of medical informatics into telemedicine systems is needed before these systems can achieve more acceptance. Twenty years ago, few people predicted this technologic revolution. Innovations arise almost daily. The future seems promising for telemedical systems, but much work is required. Partnerships with industry must move beyond niche projects, and regulatory and medicolegal issues must be resolved. Anesthesiologists can expect their practice to be affected directly by technology, and should embrace it, evaluate it, and help lead its use in this millennium.

  5. Development of KSC program for investigating and generating field failure rates. Volume 1: Summary and overview

    NASA Technical Reports Server (NTRS)

    Bean, E. E.; Bloomquist, C. E.

    1972-01-01

    A summary of the KSC program for investigating the reliability aspects of the ground support activities is presented. An analysis of unsatisfactory condition reports (RC), and the generation of reliability assessment of components based on the URC are discussed along with the design considerations for attaining reliable real time hardware/software configurations.

  6. FTA multi-year research program plan (FY 2009 - FY 2013).

    DOT National Transportation Integrated Search

    2008-09-01

    The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...

  7. Development of the Rational Behavior Inventory: Initial Validity and Reliability

    ERIC Educational Resources Information Center

    Shorkey, Clayton T.; Whiteman, Victor L.

    1977-01-01

    The results of initial validity and reliability studies on the Rational Behavior Inventory are presented. The instrument was developed to be used for assessment, treatment planning, and evaluation of clients by counselors who use Rational Emotive Therapy. (Author/JKS)

  8. Space flight requirements for fiber optic components: qualification testing and lessons learned

    NASA Astrophysics Data System (ADS)

    Ott, Melanie N.; Jin, Xiaodan Linda; Chuska, Richard; Friedberg, Patricia; Malenab, Mary; Matuszeski, Adam

    2006-04-01

    "Qualification" of fiber optic components holds a very different meaning than it did ten years ago. In the past, qualification meant extensive prolonged testing and screening that led to a programmatic method of reliability assurance. For space flight programs today, the combination of using higher performance commercial technology, with shorter development schedules and tighter mission budgets makes long term testing and reliability characterization unfeasible. In many cases space flight missions will be using technology within years of its development and an example of this is fiber laser technology. Although the technology itself is not a new product the components that comprise a fiber laser system change frequently as processes and packaging changes occur. Once a process or the materials for manufacturing a component change, even the data that existed on its predecessor can no longer provide assurance on the newer version. In order to assure reliability during a space flight mission, the component engineer must understand the requirements of the space flight environment as well as the physics of failure of the components themselves. This can be incorporated into an efficient and effective testing plan that "qualifies" a component to specific criteria defined by the program given the mission requirements and the component limitations. This requires interaction at the very initial stages of design between the system design engineer, mechanical engineer, subsystem engineer and the component hardware engineer. Although this is the desired interaction what typically occurs is that the subsystem engineer asks the components or development engineers to meet difficult requirements without knowledge of the current industry situation or the lack of qualification data. This is then passed on to the vendor who can provide little help with such a harsh set of requirements due to high cost of testing for space flight environments. This presentation is designed to guide the engineers of design, development and components, and vendors of commercial components with how to make an efficient and effective qualification test plan with some basic generic information about many space flight requirements. Issues related to the physics of failure, acceptance criteria and lessons learned will also be discussed to assist with understanding how to approach a space flight mission in an ever changing commercial photonics industry.

  9. Space Flight Requirements for Fiber Optic Components; Qualification Testing and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Ott, Melanie N.; Jin, Xiaodan Linda; Chuska, Richard; Friedberg, Patricia; Malenab, Mary; Matuszeski, Adam

    2007-01-01

    "Qualification" of fiber optic components holds a very different meaning than it did ten years ago. In the past, qualification meant extensive prolonged testing and screening that led to a programmatic method of reliability assurance. For space flight programs today, the combination of using higher performance commercial technology, with shorter development schedules and tighter mission budgets makes long term testing and reliability characterization unfeasible. In many cases space flight missions will be using technology within years of its development and an example of this is fiber laser technology. Although the technology itself is not a new product the components that comprise a fiber laser system change frequently as processes and packaging changes occur. Once a process or the materials for manufacturing a component change, even the data that existed on its predecessor can no longer provide assurance on the newer version. In order to assure reliability during a space flight mission, the component engineer must understand the requirements of the space flight environment as well as the physics of failure of the components themselves. This can be incorporated into an efficient and effective testing plan that "qualifies" a component to specific criteria defined by the program given the mission requirements and the component limitations. This requires interaction at the very initial stages of design between the system design engineer, mechanical engineer, subsystem engineer and the component hardware engineer. Although this is the desired interaction what typically occurs is that the subsystem engineer asks the components or development engineers to meet difficult requirements without knowledge of the current industry situation or the lack of qualification data. This is then passed on to the vendor who can provide little help with such a harsh set of requirements due to high cost of testing for space flight environments. This presentation is designed to guide the engineers of design, development and components, and vendors of commercial components with how to make an efficient and effective qualification test plan with some basic generic information about many space flight requirements. Issues related to the physics of failure, acceptance criteria and lessons learned will also be discussed to assist with understanding how to approach a space flight mission in an ever changing commercial photonics industry.

  10. Overview of Historical Earthquake Document Database in Japan and Future Development

    NASA Astrophysics Data System (ADS)

    Nishiyama, A.; Satake, K.

    2014-12-01

    In Japan, damage and disasters from historical large earthquakes have been documented and preserved. Compilation of historical earthquake documents started in the early 20th century and 33 volumes of historical document source books (about 27,000 pages) have been published. However, these source books are not effectively utilized for researchers due to a contamination of low-reliability historical records and a difficulty for keyword searching by characters and dates. To overcome these problems and to promote historical earthquake studies in Japan, construction of text database started in the 21 century. As for historical earthquakes from the beginning of the 7th century to the early 17th century, "Online Database of Historical Documents in Japanese Earthquakes and Eruptions in the Ancient and Medieval Ages" (Ishibashi, 2009) has been already constructed. They investigated the source books or original texts of historical literature, emended the descriptions, and assigned the reliability of each historical document on the basis of written age. Another database compiled the historical documents for seven damaging earthquakes occurred along the Sea of Japan coast in Honshu, central Japan in the Edo period (from the beginning of the 17th century to the middle of the 19th century) and constructed text database and seismic intensity data base. These are now publicized on the web (written only in Japanese). However, only about 9 % of the earthquake source books have been digitized so far. Therefore, we plan to digitize all of the remaining historical documents by the research-program which started in 2014. The specification of the data base will be similar for previous ones. We also plan to combine this database with liquefaction traces database, which will be constructed by other research program, by adding the location information described in historical documents. Constructed database would be utilized to estimate the distributions of seismic intensities and tsunami heights.

  11. High-reliability gas-turbine combined-cycle development program: Phase II. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hecht, K.G.; Sanderson, R.A.; Smith, M.J.

    This three-volume report presents the results of Phase II of the multiphase EPRI-sponsored High-Reliability Gas Turbine Combined-Cycle Development Program whose goal is to achieve a highly reliable gas turbine combined-cycle power plant, available by the mid-1980s, which would be an economically attractive baseload generation alternative for the electric utility industry. The Phase II program objective was to prepare the preliminary design of this power plant. This volume presents information of the reliability, availability, and maintainability (RAM) analysis of a representative plant and the preliminary design of the gas turbine, the gas turbine ancillaries, and the balance of plant including themore » steam turbine generator. To achieve the program goals, a gas turbine was incorporated which combined proven reliability characteristics with improved performance features. This gas turbine, designated the V84.3, is the result of a cooperative effort between Kraftwerk Union AG and United Technologies Corporation. Gas turbines of similar design operating in Europe under baseload conditions have demonstrated mean time between failures in excess of 40,000 hours. The reliability characteristics of the gas turbine ancillaries and balance-of-plant equipment were improved through system simplification and component redundancy and by selection of component with inherent high reliability. A digital control system was included with logic, communications, sensor redundancy, and mandual backup. An independent condition monitoring and diagnostic system was also included. Program results provide the preliminary design of a gas turbine combined-cycle baseload power plant. This power plant has a predicted mean time between failure of nearly twice the 3000-hour EPRI goal. The cost of added reliability features is offset by improved performance, which results in a comparable specific cost and an 8% lower cost of electricity compared to present market offerings.« less

  12. An Evaluation of the Technical Adequacy of a Revised Measure of Quality Indicators of Transition

    ERIC Educational Resources Information Center

    Morningstar, Mary E.; Lee, Hyunjoo; Lattin, Dana L.; Murray, Angela K.

    2016-01-01

    This study confirmed the reliability and validity of the Quality Indicators of Exemplary Transition Programs Needs Assessment-2 (QI-2). Quality transition program indicators were identified through a systematic synthesis of transition research, policies, and program evaluation measures. To verify reliability and validity of the QI-2, we…

  13. 7 CFR 1710.407 - Business plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Business plan. 1710.407 Section 1710.407 Agriculture... Conservation Loan Program § 1710.407 Business plan. An Eligible EE Program must have a business plan for implementing the program. The business plan is expected to have a global perspective on the borrower's energy...

  14. Contracts and Management Services FY 1996 Site Support Program Plan: WBS 6.10.14. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knoll, J.M. Jr.

    1995-09-01

    This is the Contracts and Management Services site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail including cost accounting narrative summary, approved funding budget, and activity detailed description.

  15. 2 CFR 215.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false Revision of budget and program plans. 215.25 Section 215.25 Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET CIRCULARS AND GUIDANCE Reserved... Program Management § 215.25 Revision of budget and program plans. (a) The budget plan is the financial...

  16. 75 FR 70061 - Dealer Floor Plan Pilot Program Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... SMALL BUSINESS ADMINISTRATION Dealer Floor Plan Pilot Program Meeting AGENCY: U.S. Small Business... location, date, time, and agenda for a meeting regarding the Dealer Floor Plan Pilot Program established in... Plan Pilot Program meeting will be held on November 16, 2010 from approximately 9 a.m. to 12 p.m...

  17. 18 CFR 39.4 - Funding of the Electric Reliability Organization.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... business plan and organization chart, explaining the proposed collection of all dues, fees and charges and... budget and business plan no later than sixty (60) days in advance of the beginning of the Electric... Organization may include in the application a plan for a transitional funding mechanism that would allow such...

  18. 34 CFR 300.601 - State performance plans and data collection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Monitoring, Technical Assistance, and Enforcement § 300.601 State performance plans and data collection. (a... 34 Education 2 2010-07-01 2010-07-01 false State performance plans and data collection. 300.601... described in § 300.600(d). (b) Data collection. (1) Each State must collect valid and reliable information...

  19. 78 FR 30804 - Transmission Planning Reliability Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... ``Non-Consequential Load Loss.'' 6. On the same day that the Commission issued Order No. 762, it issued... Non-Consequential Load Loss meets the conditions shown in Attachment 1. In no case can the planned Non...- consequential load loss following a single contingency provided that the plan is documented and vetted in an...

  20. Evaluating spatially explicit burn probabilities for strategic fire management planning

    Treesearch

    C. Miller; M.-A. Parisien; A. A. Ager; M. A. Finney

    2008-01-01

    Spatially explicit information on the probability of burning is necessary for virtually all strategic fire and fuels management planning activities, including conducting wildland fire risk assessments, optimizing fuel treatments, and prevention planning. Predictive models providing a reliable estimate of the annual likelihood of fire at each point on the landscape have...

  1. Incorporating intelligent transportation systems into planning analysis : summary of key findings from a 2020 case study -- improving travel time reliability with ITS

    DOT National Transportation Integrated Search

    2002-05-01

    ITS is typically considered an operational detail to be worked out after infrastructure planning is complete. This approach ignores the potential for the introduction of ITS to change the decisions made during infrastructure planning, or even the ove...

  2. Development and Reliability of the Comprehensive Crisis Plan Checklist

    ERIC Educational Resources Information Center

    Aspiranti, Kathleen B.; Pelchar, Taylor K.; McCLeary, Daniel F.; Bain, Sherry K.; Foster, Lisa N.

    2011-01-01

    It is of vital importance that children are educated in a safe environment. Every school needs to have a well-developed crisis management document containing plans for prevention, intervention, and postvention. We developed the Comprehensive Crisis Plan Checklist (CCPC) to serve as a valuable tool that can be used to assist practitioners with…

  3. Anticipatory Action Planning Increases from 3 to 10 Years of Age in Typically Developing Children

    ERIC Educational Resources Information Center

    Jongbloed-Pereboom, Marjolein; Nijhuis-van der Sanden, Maria W. G.; Saraber-Schiphorst, Nicole; Craje, Celine; Steenbergen, Bert

    2013-01-01

    The primary aim of this study was to assess the development of action planning in a group of typically developing children aged 3 to 10 years (N = 351). The second aim was to assess reliability of the action planning task and to relate the results of the action planning task to results of validated upper limb motor performance tests. Participants…

  4. Strategic benefits of master facility plans.

    PubMed

    Shannon, K

    1996-02-01

    In recent years, many healthcare executives have stopped developing master facility plans due to some basic misconceptions about them, namely that master facility plans are too rigid or require major capital commitment. By getting past these misconceptions, healthcare executives can help their organizations develop and implement master facility plans that serve as flexible, reliable blueprints in guiding the organizations toward achieving their strategic, operational, and financial goals.

  5. Planning to Explore: Using a Coordinated Multisource Infrastructure to Overcome Present and Future Space Flight Planning Challenges

    NASA Technical Reports Server (NTRS)

    Balaban, Edward; Orosz, Michael; Kichkaylo, Tatiana; Goforth, Andre; Sweet, Adam; Neches, Robert

    2006-01-01

    Few human endeavors present as much of a planning and scheduling challenge as space flight, particularly manned space flight. Just on the operational side of it, efforts of thousands of people across hundreds of organizations need to be coordinated. Numerous tasks of varying complexity and nature, from scientific to construction, need to be accomplished within limited mission time frames. Resources need to be carefully managed and contingencies worked out, often on a very short notice. From the beginning of the NASA space program, planning has been done by large teams of domain experts working months, sometimes years, to put together a single mission. This approach, while proven very reliable up to now, is becoming increasingly harder to sustain. Elevated levels of NASA space activities, from deployment of the new Crew Exploration Vehicle (CEV) and completion of the International Space Station (ISS), to the planned lunar missions and permanent lunar bases, will put an even greater strain on this largely manual process. While several attempts to automate it have been made in the past, none have fully succeeded. In this paper we describe the current NASA planning methods, outline their advantages and disadvantages, discuss the planning challenges of upcoming missions and propose a distributed planning/scheduling framework (CMMD) aimed at unifying and optimizing the planning effort. CMMD will not attempt to make the process completely automated, but rather serve in a decision support capacity for human managers and planners. It will help manage information gathering, creation of partial and consolidated schedules, inter-team negotiations, contingencies investigation, and rapid re-planning when the situation demands it. The fist area of CMMD application will be planning for Extravehicular Activities (EVA) and associated logistics. Other potential applications, not only in the space flight domain, and future research efforts will be discussed as well.

  6. Steady State Advanced Tokamak (SSAT): The mission and the machine

    NASA Astrophysics Data System (ADS)

    Thomassen, K.; Goldston, R.; Nevins, B.; Neilson, H.; Shannon, T.; Montgomery, B.

    1992-03-01

    Extending the tokamak concept to the steady state regime and pursuing advances in tokamak physics are important and complementary steps for the magnetic fusion energy program. The required transition away from inductive current drive will provide exciting opportunities for advances in tokamak physics, as well as important impetus to drive advances in fusion technology. Recognizing this, the Fusion Policy Advisory Committee and the U.S. National Energy Strategy identified the development of steady state tokamak physics and technology, and improvements in the tokamak concept, as vital elements in the magnetic fusion energy development plan. Both called for the construction of a steady state tokamak facility to address these plan elements. Advances in physics that produce better confinement and higher pressure limits are required for a similar unit size reactor. Regimes with largely self-driven plasma current are required to permit a steady-state tokamak reactor with acceptable recirculating power. Reliable techniques of disruption control will be needed to achieve the availability goals of an economic reactor. Thus the central role of this new tokamak facility is to point the way to a more attractive demonstration reactor (DEMO) than the present data base would support. To meet the challenges, we propose a new 'Steady State Advanced Tokamak' (SSAT) facility that would develop and demonstrate optimized steady state tokamak operating mode. While other tokamaks in the world program employ superconducting toroidal field coils, SSAT would be the first major tokamak to operate with a fully superconducting coil set in the elongated, divertor geometry planned for ITER and DEMO.

  7. Interval-parameter chance-constraint programming model for end-of-life vehicles management under rigorous environmental regulations.

    PubMed

    Simic, Vladimir

    2016-06-01

    As the number of end-of-life vehicles (ELVs) is estimated to increase to 79.3 million units per year by 2020 (e.g., 40 million units were generated in 2010), there is strong motivation to effectively manage this fast-growing waste flow. Intensive work on management of ELVs is necessary in order to more successfully tackle this important environmental challenge. This paper proposes an interval-parameter chance-constraint programming model for end-of-life vehicles management under rigorous environmental regulations. The proposed model can incorporate various uncertainty information in the modeling process. The complex relationships between different ELV management sub-systems are successfully addressed. Particularly, the formulated model can help identify optimal patterns of procurement from multiple sources of ELV supply, production and inventory planning in multiple vehicle recycling factories, and allocation of sorted material flows to multiple final destinations under rigorous environmental regulations. A case study is conducted in order to demonstrate the potentials and applicability of the proposed model. Various constraint-violation probability levels are examined in detail. Influences of parameter uncertainty on model solutions are thoroughly investigated. Useful solutions for the management of ELVs are obtained under different probabilities of violating system constraints. The formulated model is able to tackle a hard, uncertainty existing ELV management problem. The presented model has advantages in providing bases for determining long-term ELV management plans with desired compromises between economic efficiency of vehicle recycling system and system-reliability considerations. The results are helpful for supporting generation and improvement of ELV management plans. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. Ready to sell our program. Anybody who is interested in learning Indonesian experience is invited to take part in the BKKBN's international training program.

    PubMed

    Suyono, H

    1996-01-01

    The Indonesian Family Planning Program was officially launched in 1970 when President Suharto developed the National Family Planning Coordinating Board (BKKBN) to administrate the national family planning program. The inauguration of the family planning program came at the heels of a special demand by the people with very strong support of the ulama. The program was subsequently developed and expanded into remote areas in 1976. In 1992, a family-based approach to family planning was implemented in which every village family was made responsible for family planning. The program is based upon a very strong political commitment at the highest level as well as at the provincial, district, subdistrict, and village levels; it continuously innovates; every community can name its family planning program as it likes; and there is constant feedback to the community. Indonesia's family planning program strategies are as follows: it is suggested that couples in which the wife is aged 20-30 years have only two children; it is recommended that women over age 30 have no more children due to the comparatively high risks of pregnancy at that age; considerable effort is given to encourage youths to not become pregnant and bear children; numerous chairmen of small community family planning groups are appointed; and social and cultural conditions have been created in which people work for family planning activities. People interested in learning from the Indonesian experience in family planning may participate in the BKKBN's international training program.

  9. Electrical, Electronic, and Electromechanical (EEE) parts management and control requirements for NASA space flight programs

    NASA Technical Reports Server (NTRS)

    1989-01-01

    This document establishes electrical, electronic, and electromechanical (EEE) parts management and control requirements for contractors providing and maintaining space flight and mission-essential or critical ground support equipment for NASA space flight programs. Although the text is worded 'the contractor shall,' the requirements are also to be used by NASA Headquarters and field installations for developing program/project parts management and control requirements for in-house and contracted efforts. This document places increased emphasis on parts programs to ensure that reliability and quality are considered through adequate consideration of the selection, control, and application of parts. It is the intent of this document to identify disciplines that can be implemented to obtain reliable parts which meet mission needs. The parts management and control requirements described in this document are to be selectively applied, based on equipment class and mission needs. Individual equipment needs should be evaluated to determine the extent to which each requirement should be implemented on a procurement. Utilization of this document does not preclude the usage of other documents. The entire process of developing and implementing requirements is referred to as 'tailoring' the program for a specific project. Some factors that should be considered in this tailoring process include program phase, equipment category and criticality, equipment complexity, and mission requirements. Parts management and control requirements advocated by this document directly support the concept of 'reliability by design' and are an integral part of system reliability and maintainability. Achieving the required availability and mission success objectives during operation depends on the attention given reliability and maintainability in the design phase. Consequently, it is intended that the requirements described in this document are consistent with those of NASA publications, 'Reliability Program Requirements for Aeronautical and Space System Contractors,' NHB 5300.4(1A-l); 'Maintainability Program Requirements for Space Systems,' NHB 5300.4(1E); and 'Quality Program Provisions for Aeronautical and Space System Contractors,' NHB 5300.4(1B).

  10. Transportation profiles for MAFC commodities.

    DOT National Transportation Integrated Search

    2011-08-01

    Effective planning for freight in the public sector is often hindered by the difficulty in obtaining reliable estimates of the quantity of : freight commodities flowing between points in the planning area. In an effort to address this issue, the stat...

  11. Comparison of the dose distribution obtained from dosimetric systems with intensity modulated radiotherapy planning system in the treatment of prostate cancer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gökçe, M., E-mail: mgokce@adu.edu.tr; Uslu, D. Koçyiğit; Ertunç, C.

    The aim of this study is to compare Intensity Modulated Radiation Therapy (IMRT) plan of prostate cancer patients with different dose verification systems in dosimetric aspects and to compare these systems with each other in terms of reliability, applicability and application time. Dosimetric control processes of IMRT plan of three prostate cancer patients were carried out using thermoluminescent dosimeter (TLD), ion chamber (IC) and 2D Array detector systems. The difference between the dose values obtained from the dosimetric systems and treatment planning system (TPS) were found to be about % 5. For the measured (TLD) and calculated (TPS) doses %3more » percentage differences were obtained for the points close to center while percentage differences increased at the field edges. It was found that TLD and IC measurements will increase the precision and reliability of the results of 2D Array.« less

  12. Reliability on ISS Talk Outline

    NASA Technical Reports Server (NTRS)

    Misiora, Mike

    2015-01-01

    1. Overview of ISS 2. Space Environment and it effects a. Radiation b. Microgravity 3. How we ensure reliability a. Requirements b. Component Selection i. Note: I plan to stay away from talk about Rad Hardened components and talk about why we use older processors because they are less susceptible to SEUs. c. Testing d. Redundancy / Failure Tolerance e. Sparing strategies 4. Operational Examples a. Multiple MDM Failures on 6A due to hard drive failure In general, my plan is to only talk about data that is currently available via normal internet sources to ensure that I stay away from any topics that would be Export Controlled, ITAR, or NDA-controlled. The operational example has been well-reported on in the media and those are the details that I plan to cover. Additionally I am not planning on using any slides or showing any photos during the talk.

  13. Examining the value of travel time reliability for freight transportation to support freight planning and decision-making.

    DOT National Transportation Integrated Search

    2016-12-01

    This report presents the findings of a valuation study recently conducted in Florida to quantify the : freight users willingness to pay (WTP) for the improvement of transportation-related attributes, : particularly reliability. A stated preference...

  14. Examining the value of travel time reliability for freight transportation to support freight planning and decision-Making [summary].

    DOT National Transportation Integrated Search

    2016-12-01

    As consumers demand greater choice and availability of products, suppliers have responded with more just-in-time delivery and less centralized inventories. Keeping this supply chain working efficiently requires reliable freight transportation. Delays...

  15. A Quantitative Reliability, Maintainability and Supportability Approach for NASA's Second Generation Reusable Launch Vehicle

    NASA Technical Reports Server (NTRS)

    Safie, Fayssal M.; Daniel, Charles; Kalia, Prince; Smith, Charles A. (Technical Monitor)

    2002-01-01

    The United States National Aeronautics and Space Administration (NASA) is in the midst of a 10-year Second Generation Reusable Launch Vehicle (RLV) program to improve its space transportation capabilities for both cargo and crewed missions. The objectives of the program are to: significantly increase safety and reliability, reduce the cost of accessing low-earth orbit, attempt to leverage commercial launch capabilities, and provide a growth path for manned space exploration. The safety, reliability and life cycle cost of the next generation vehicles are major concerns, and NASA aims to achieve orders of magnitude improvement in these areas. To get these significant improvements, requires a rigorous process that addresses Reliability, Maintainability and Supportability (RMS) and safety through all the phases of the life cycle of the program. This paper discusses the RMS process being implemented for the Second Generation RLV program.

  16. Design for Reliability and Safety Approach for the New NASA Launch Vehicle

    NASA Technical Reports Server (NTRS)

    Safie, Fayssal M.; Weldon, Danny M.

    2007-01-01

    The United States National Aeronautics and Space Administration (NASA) is in the midst of a space exploration program intended for sending crew and cargo to the international Space Station (ISS), to the moon, and beyond. This program is called Constellation. As part of the Constellation program, NASA is developing new launch vehicles aimed at significantly increase safety and reliability, reduce the cost of accessing space, and provide a growth path for manned space exploration. Achieving these goals requires a rigorous process that addresses reliability, safety, and cost upfront and throughout all the phases of the life cycle of the program. This paper discusses the "Design for Reliability and Safety" approach for the NASA new launch vehicles, the ARES I and ARES V. Specifically, the paper addresses the use of an integrated probabilistic functional analysis to support the design analysis cycle and a probabilistic risk assessment (PRA) to support the preliminary design and beyond.

  17. Lifetime Reliability Evaluation of Structural Ceramic Parts with the CARES/LIFE Computer Program

    NASA Technical Reports Server (NTRS)

    Nemeth, Noel N.; Powers, Lynn M.; Janosik, Lesley A.; Gyekenyesi, John P.

    1993-01-01

    The computer program CARES/LIFE calculates the time-dependent reliability of monolithic ceramic components subjected to thermomechanical and/or proof test loading. This program is an extension of the CARES (Ceramics Analysis and Reliability Evaluation of Structures) computer program. CARES/LIFE accounts for the phenomenon of subcritical crack growth (SCG) by utilizing the power law, Paris law, or Walker equation. The two-parameter Weibull cumulative distribution function is used to characterize the variation in component strength. The effects of multiaxial stresses are modeled using either the principle of independent action (PIA), Weibull's normal stress averaging method (NSA), or Batdorf's theory. Inert strength and fatigue parameters are estimated from rupture strength data of naturally flawed specimens loaded in static, dynamic, or cyclic fatigue. Two example problems demonstrating cyclic fatigue parameter estimation and component reliability analysis with proof testing are included.

  18. New perspectives on population: lessons from Cairo.

    PubMed

    Ashford, L S

    1995-03-01

    The lessons from the 1994 World Population Conference in Cairo, Egypt, are summarized in this publication. The topics of discussion include the evolution of population policies, the changing policy environment, demographic trends, and solutions in the form of gender equity, provision of reproductive health services, and sustainable social and economic development. The program of action supported by 180 governments and targeted for 2015 articulated the goals of universal access to a full range of safe and reliable family planning methods and reproductive health services, a specified level of reduction in infant and child mortality, a specified level of reduction in maternal mortality, an increase in life expectancy to 70-75 years or more, and universal access to and completion of primary education. Other features include goals for improving women's status and equity in gender relations, expansion of educational and job opportunities for women and girls, and involvement of men in childrearing responsibilities and family planning. Steps should be taken to eliminate poverty and reduce or eliminate unsustainable patterns of production and consumption. Population policy must be integrated within social and economic development policies. About $22 billion will be needed for provision of family planning and reproductive health services by the year 2015. Costs will increase over the 10-year period due to the increased population to be served. Per person user costs for family planning alone are higher in countries without infrastructure and technical skills. Actual costs vary with the cost of contraceptive supplies, patterns of use, and efficiency of delivery systems. Although the plan offers 16 chapters worth of advice and recommends 243 specific actions, countries will have to be selective due to cost limitations. The 20/20 Initiative is proposed for sharing social service costs between international donors (20%) and host countries (20%). A separate UN projection of need is for 33% of support from international donors for family planning and related programs. The constraints to the implementation of the action plan are identified as the rate of demographic change, the extent of public support for population limitation and provision of family planning services, and potential conflicts of interests and funding between cooperating agencies. The World Bank has developed guidelines for policy development according to a country's identification as an emergent, transitional, or advanced country.

  19. A Guide to the Application of Probability Risk Assessment Methodology and Hazard Risk Frequency Criteria as a Hazard Control for the Use of the Mobile Servicing System on the International Space Station

    NASA Astrophysics Data System (ADS)

    D'silva, Oneil; Kerrison, Roger

    2013-09-01

    A key feature for the increased utilization of space robotics is to automate Extra-Vehicular manned space activities and thus significantly reduce the potential for catastrophic hazards while simultaneously minimizing the overall costs associated with manned space. The principal scope of the paper is to evaluate the use of industry standard accepted Probability risk/safety assessment (PRA/PSA) methodologies and Hazard Risk frequency Criteria as a hazard control. This paper illustrates the applicability of combining the selected Probability risk assessment methodology and hazard risk frequency criteria, in order to apply the necessary safety controls that allow for the increased use of the Mobile Servicing system (MSS) robotic system on the International Space Station. This document will consider factors such as component failure rate reliability, software reliability, and periods of operation and dormancy, fault tree analyses and their effects on the probability risk assessments. The paper concludes with suggestions for the incorporation of existing industry Risk/Safety plans to create an applicable safety process for future activities/programs

  20. NASA Aerospace Flight Battery Systems Program: An update

    NASA Astrophysics Data System (ADS)

    Manzo, Michelle A.

    1992-02-01

    The major objective of the NASA Aerospace Flight Battery Systems Program is to provide NASA with the policy and posture to increase and ensure the safety, performance, and reliability of batteries for space power systems. The program was initiated in 1985 to address battery problems experienced by NASA and other space battery users over the previous ten years. The original program plan was approved in May 1986 and modified in 1990 to reflect changes in the agency's approach to battery related problems that are affecting flight programs. The NASA Battery Workshop is supported by the NASA Aerospace Flight Battery Systems Program. The main objective of the discussions is to aid in defining the direction which the agency should head with respect to aerospace battery issues. Presently, primary attention in the Battery Program is being devoted to issues revolving around the future availability of nickel-cadmium batteries as a result of the proposed OSHA standards with respect to allowable cadmium levels in the workplace. The decision of whether or not to pursue the development of an advanced nickel-cadmium cell design and the qualification of vendors to produce cells for flight programs hinges on the impact of the OSHA ruling. As part of a unified Battery Program, the evaluation of a nickel-hydrogen cell design options and primary cell issues are also being pursued to provide high performance NASA Standards and space qualified state-of-the-art cells. The resolution of issues is being addressed with the full participation of the aerospace battery community.

Top